type     day        hms     lat       lon         spd        dir       pre        qi
IR     2025250     20200   20.2600  144.4400       8.5        98       919        92
IR     2025250     20200   20.1800  144.5400       8.2       113       922        81
IR     2025250     20200   20.2000  144.5200       8.0       113       919        82
IR     2025250     20200   20.1100  143.2800      12.0       125       872        85
IR     2025250     20200   20.1300  143.2600      11.4       119       883        79
IR     2025250     20200   20.0100  142.8400      11.5       133       852        82
IR     2025250     20200   20.0900  142.7300      12.5       127       851        79
IR     2025250     20200   20.0900  142.7100      12.2       125       854        81
IR     2025250     20200   19.9700  143.4700      13.8       134       862        72
IR     2025250     20200   19.9500  143.3900      14.1       127       848        83
IR     2025250     20200   19.9100  143.2100      14.0       111       769        78
IR     2025250     20200   19.9900  143.1200      13.1       104       837        67
IR     2025250     20200   19.9300  142.9600       8.9       117       857        82
IR     2025250     20200   19.9300  142.8400      10.5       132       854        85
IR     2025250     20200   19.9900  142.7400      12.2       131       847        78
IR     2025250     20200   19.8900  149.1600       4.0        44       974        64
IR     2025250     20200   19.8900  143.4400      13.7       131       827        75
IR     2025250     20200   19.8900  143.1900      13.6       110       705        75
IR     2025250     20200   19.8500  143.0300       9.3       107       700        79
IR     2025250     20200   19.8100  142.9700       9.2       113       823        81
IR     2025250     20200   19.8900  142.8600       9.7       129       855        81
IR     2025250     20200   19.8700  142.8200      10.0       131       852        83
IR     2025250     20200   19.8700  142.3300      14.0       114       865        75
IR     2025250     20200   19.8900  142.2700      14.5       114       868        81
IR     2025250     20200   19.8900  142.1300      14.5       117       880        92
IR     2025250     20200   19.8600  142.0800      14.0       115       885        92
IR     2025250     20200   19.7200  143.8500      12.8       128       808        84
IR     2025250     20200   19.7600  143.8100      12.8       125       806        83
IR     2025250     20200   19.8000  143.7300      13.1       127       810        80
IR     2025250     20200   19.7100  143.6100      12.4       123       794        87
IR     2025250     20200   19.7300  143.4700      13.7       130       774        80
IR     2025250     20200   19.7100  143.3600      14.9       131       737        82
IR     2025250     20200   19.7100  143.2600      12.6       126       717        93
IR     2025250     20200   19.7100  143.1800      11.5       122       657        87
IR     2025250     20200   19.7500  142.9700       9.7       114       755        96
IR     2025250     20200   19.7700  142.9500       9.8       115       808        90
IR     2025250     20200   19.7100  142.7900       9.5       120       824        76
IR     2025250     20200   19.7300  142.7300      10.6       126       831        79
IR     2025250     20200   19.7100  142.4000      14.2       117       828        84
IR     2025250     20200   19.7300  142.3800      13.6       115       836        83
IR     2025250     20200   19.7600  141.9400       9.4       120       889        72
IR     2025250     20200   19.7800  141.9000       9.1       123       889        79
IR     2025250     20200   19.7000  141.8000       8.7       125       886        60
IR     2025250     20200   19.7600  141.6400       9.4       117       883        95
IR     2025250     20200   19.7000  141.3500      12.0       119       895        73
IR     2025250     20200   19.7000  141.3100      12.4       116       897        84
IR     2025250     20200   19.7200  141.1400       9.2       113       898        63
IR     2025250     20200   19.6700  149.2800       5.5        48       975        71
IR     2025250     20200   19.6600  143.7300      11.6       125       791        90
IR     2025250     20200   19.6600  143.6900      11.8       126       791        90
IR     2025250     20200   19.6500  143.5500      13.1       129       764        87
IR     2025250     20200   19.6900  143.4900      13.8       131       756        82
IR     2025250     20200   19.6900  143.3600      14.9       132       737        82
IR     2025250     20200   19.6900  143.2800      13.0       129       723        91
IR     2025250     20200   19.6900  143.2000      11.3       122       703        96
IR     2025250     20200   19.6300  142.9200      11.5       118       800        96
IR     2025250     20200   19.6700  142.8300      10.0       116       820        87
IR     2025250     20200   19.6100  142.7100      11.8       122       845        89
IR     2025250     20200   19.6700  142.5500      14.2       127       829        83
IR     2025250     20200   19.6900  142.5400      14.4       126       828        85
IR     2025250     20200   19.6400  141.6800       9.0       120       887        67
IR     2025250     20200   19.6600  141.6600       9.3       119       887        78
IR     2025250     20200   19.6600  141.3100      12.9       114       895        86
IR     2025250     20200   19.6600  141.2900      12.9       113       896        85
IR     2025250     20200   19.6800  141.1700      11.2       110       897        75
IR     2025250     20200   19.5400  144.7600       8.8        94       979        73
IR     2025250     20200   19.5800  144.6400       9.1        81       945        75
IR     2025250     20200   19.5200  144.2700      10.8       121       796        78
IR     2025250     20200   19.5400  144.2100      10.8       121       811        87
IR     2025250     20200   19.5400  144.0500      11.6       126       761        89
IR     2025250     20200   19.5600  143.8000      10.6       123       778        89
IR     2025250     20200   19.5600  143.7200      11.0       124       773        92
IR     2025250     20200   19.5200  143.6200      11.7       129       744        90
IR     2025250     20200   19.5700  143.4500      12.3       126       736        72
IR     2025250     20200   19.5900  143.3900      11.6       119       732        79
IR     2025250     20200   19.5300  143.3300      10.7       104       728        72
IR     2025250     20200   19.5900  143.2100       8.3       104       727        95
IR     2025250     20200   19.5100  143.0900       9.4       123       742        86
IR     2025250     20200   19.5900  142.9600      11.3       118       781        97
IR     2025250     20200   19.5500  142.9400      11.9       118       793        95
IR     2025250     20200   19.5900  142.8400      11.2       114       804        94
IR     2025250     20200   19.5900  142.7300      11.8       119       843        91
IR     2025250     20200   19.5900  142.5700      14.2       128       844        79
IR     2025250     20200   19.5100  142.0800       6.3       130       311        65
IR     2025250     20200   19.5500  149.3500       5.9        46       970        75
IR     2025250     20200   19.4900  149.2300       5.1        33       964        90
IR     2025250     20200   19.4300  145.3400       9.1        81       914        70
IR     2025250     20200   19.4300  145.0600      14.0       125       950        78
IR     2025250     20200   19.4300  145.0400      13.9       125       951        78
IR     2025250     20200   19.4200  144.3600      11.0       118       759        66
IR     2025250     20200   19.4800  144.2800      10.7       121       782        69
IR     2025250     20200   19.4800  144.1300      11.5       126       768        80
IR     2025250     20200   19.4200  144.0100      11.8       129       746        88
IR     2025250     20200   19.5000  143.8900      12.5       129       761        85
IR     2025250     20200   19.4800  143.7600      11.3       130       767        87
IR     2025250     20200   19.4800  143.7000      11.7       131       754        91
IR     2025250     20200   19.4200  143.5200      12.2       127       712        73
IR     2025250     20200   19.4400  143.5000      12.3       127       709        70
IR     2025250     20200   19.4500  143.3200      10.5        99       725        64
IR     2025250     20200   19.4300  143.3000       9.9       100       729        66
IR     2025250     20200   19.4900  143.1300       9.2       124       740        95
IR     2025250     20200   19.4500  143.0700       9.5       122       766        80
IR     2025250     20200   19.4900  143.0000      10.9       121       788        90
IR     2025250     20200   19.4900  142.8400      13.1       116       819        93
IR     2025250     20200   19.4300  142.8000      13.5       116       847        90
IR     2025250     20200   19.4700  142.6800      13.6       120       855        91
IR     2025250     20200   19.4100  142.3100       9.4       125       284        69
IR     2025250     20200   19.4100  142.1600      10.0       128       263        81
IR     2025250     20200   19.4900  142.1000       6.9       128       301        77
IR     2025250     20200   19.4700  141.9800       6.4       125       299        70
IR     2025250     20200   19.4100  141.9200       6.3       118       283        78
IR     2025250     20200   19.4000  140.9100      10.8       130       871        60
IR     2025250     20200   19.4500  149.3600       5.6        46       974        69
IR     2025250     20200   19.4100  149.2200       5.1        31       955        90
IR     2025250     20200   19.4300  149.1400       4.8        19       956        83
IR     2025250     20200   19.3500  145.3700      10.2        70       925        80
IR     2025250     20200   19.3300  145.2700      11.6        82       917        79
IR     2025250     20200   19.3300  144.8800       9.4       104       919        76
IR     2025250     20200   19.3300  144.7800       8.9       103       915        87
IR     2025250     20200   19.3200  144.6700       9.7       133       832        67
IR     2025250     20200   19.3200  144.2900      10.4       115       692        97
IR     2025250     20200   19.3200  144.2400      10.4       117       721        93
IR     2025250     20200   19.4000  143.9900      11.7       129       751        88
IR     2025250     20200   19.4000  143.8500      11.3       128       759        88
IR     2025250     20200   19.4000  143.7700      11.6       133       754        87
IR     2025250     20200   19.3200  143.6700      13.5       136       730        78
IR     2025250     20200   19.3400  143.5300      11.4       124       714        73
IR     2025250     20200   19.3200  143.4500      11.5       112       694        90
IR     2025250     20200   19.3200  143.3800      10.9       111       718        97
IR     2025250     20200   19.3700  143.3000       9.9       106       736        69
IR     2025250     20200   19.3300  143.1200       9.4       127       782        78
IR     2025250     20200   19.3500  143.1100       9.4       127       784        75
IR     2025250     20200   19.3700  142.9300      12.2       119       830        91
IR     2025250     20200   19.3900  142.8400      13.3       117       838        90
IR     2025250     20200   19.3900  142.8200      13.6       115       843        90
IR     2025250     20200   19.3500  142.6400      11.8       122       269        60
IR     2025250     20200   19.3300  142.5200      10.5       122       281        72
IR     2025250     20200   19.3100  142.3700      10.0       124       276        77
IR     2025250     20200   19.3500  142.3300      10.2       125       276        73
IR     2025250     20200   19.3900  142.1900      10.8       128       262        77
IR     2025250     20200   19.3300  142.0900      10.6       123       264        88
IR     2025250     20200   19.3300  142.0400       9.6       121       264        91
IR     2025250     20200   19.3900  141.9400       6.8       120       269        85
IR     2025250     20200   19.3800  141.4900       9.6       113       868        63
IR     2025250     20200   19.3000  141.4100      13.6       108       858        71
IR     2025250     20200   19.3000  141.3600      13.0       110       854        70
IR     2025250     20200   19.3000  141.2400      13.1       110       852        70
IR     2025250     20200   19.3000  140.7600      11.2       127       871        68
IR     2025250     20200   19.3200  140.6600      10.7       126       867        74
IR     2025250     20200   19.2700  149.1900       4.1        49       949        71
IR     2025250     20200   19.3100  145.3700      10.5        71       925        80
IR     2025250     20200   19.3100  145.2700      11.6        85       914        75
IR     2025250     20200   19.2300  144.8200      10.8       132       892        84
IR     2025250     20200   19.2300  144.6600      10.3       136       873        64
IR     2025250     20200   19.2800  144.4900      11.4       135       549        83
IR     2025250     20200   19.3000  144.2100      10.6       120       720        91
IR     2025250     20200   19.3000  143.9800      11.9       131       767        87
IR     2025250     20200   19.2800  143.6900      13.9       137       731        77
IR     2025250     20200   19.2800  143.5700      11.8       126       716        75
IR     2025250     20200   19.2800  143.5300      11.1       121       713        77
IR     2025250     20200   19.3000  143.4000      11.2       112       710        99
IR     2025250     20200   19.2900  143.3000      11.0       122       751        93
IR     2025250     20200   19.2900  143.2400      11.0       126       759        94
IR     2025250     20200   19.2500  142.6700      12.2       123       269        64
IR     2025250     20200   19.2100  142.5800      10.8       121       258        70
IR     2025250     20200   19.2300  142.4800      10.1       122       265        71
IR     2025250     20200   19.2900  142.3800       9.8       123       276        79
IR     2025250     20200   19.2500  142.3200      10.4       123       271        82
IR     2025250     20200   19.2100  142.2500      10.2       119       280        93
IR     2025250     20200   19.2100  142.1300      10.7       119       275        93
IR     2025250     20200   19.2700  142.0500      10.2       118       271        89
IR     2025250     20200   19.2700  141.9000       8.6       115       279        87
IR     2025250     20200   19.2500  141.8600       9.1       116       317        92
IR     2025250     20200   19.2100  141.6400      11.1       120       524        86
IR     2025250     20200   19.2300  141.5100      11.5       117       550        92
IR     2025250     20200   19.2100  141.4900      11.6       115       546        94
IR     2025250     20200   19.2200  141.3700      15.4       106       807        61
IR     2025250     20200   19.2200  141.2200      14.8       111       679        64
IR     2025250     20200   19.2200  141.2000      14.1       112       680        67
IR     2025250     20200   19.2000  140.9700      11.8       122       822        68
IR     2025250     20200   19.2000  140.8700      12.4       128       838        65
IR     2025250     20200   19.2000  140.7700      11.3       127       842        63
IR     2025250     20200   19.1300  144.8900      12.1       137       878        80
IR     2025250     20200   19.2100  144.8000      10.7       133       888        84
IR     2025250     20200   19.1600  144.5200      12.3       139       529        83
IR     2025250     20200   19.1200  144.3800      10.0       131       537        83
IR     2025250     20200   19.2000  144.3300       8.3       121       543        87
IR     2025250     20200   19.1200  144.0100      10.6       129       807        84
IR     2025250     20200   19.1800  143.9200      10.8       126       783        86
IR     2025250     20200   19.1200  143.8400      11.0       123       748        94
IR     2025250     20200   19.2000  143.7600      12.5       131       741        77
IR     2025250     20200   19.2000  143.6100      12.2       128       719        62
IR     2025250     20200   19.2000  143.3700      10.7       113       751        85
IR     2025250     20200   19.1600  143.2100      10.0       124       826        82
IR     2025250     20200   19.1300  142.7100      13.0       122       280        75
IR     2025250     20200   19.1900  142.6100      11.0       122       262        70
IR     2025250     20200   19.1500  142.5900      11.0       122       263        71
IR     2025250     20200   19.1900  142.4200      10.0       120       272        72
IR     2025250     20200   19.1100  142.3800      10.5       118       282        81
IR     2025250     20200   19.1100  142.2800      10.6       117       313        88
IR     2025250     20200   19.1300  142.1800       9.9       115       314        95
IR     2025250     20200   19.1900  142.1100      10.3       117       277        93
IR     2025250     20200   19.1300  141.9500      11.0       114       281        93
IR     2025250     20200   19.1300  141.6600      10.0       124       398        88
IR     2025250     20200   19.1500  141.5600      10.4       118       476        92
IR     2025250     20200   19.1700  141.5500      10.6       118       534        92
IR     2025250     20200   19.1800  140.7900      11.8       127       826        68
IR     2025250     20200   19.1100  144.8900      12.1       137       876        80
IR     2025250     20200   19.0700  144.7100      12.1       146       850        77
IR     2025250     20200   19.0600  144.4600      11.1       133       507        81
IR     2025250     20200   19.0200  144.4000       9.7       131       534        85
IR     2025250     20200   19.0600  144.3000       9.4       131       549        85
IR     2025250     20200   19.0600  144.0500      10.4       129       812        85
IR     2025250     20200   19.0600  143.9100       9.6       118       766        94
IR     2025250     20200   19.1000  143.8500      10.5       121       751        95
IR     2025250     20200   19.1000  143.3500       9.7       115       852        80
IR     2025250     20200   19.0100  142.9200      12.2       121       267        60
IR     2025250     20200   19.0500  142.8400      13.8       120       280        68
IR     2025250     20200   19.0500  142.7600      13.5       123       276        74
IR     2025250     20200   19.0300  142.6300      12.5       120       275        79
IR     2025250     20200   19.0700  142.5300      11.7       123       267        75
IR     2025250     20200   19.0500  142.4300      11.7       119       281        80
IR     2025250     20200   19.0100  142.3700      12.6       116       303        75
IR     2025250     20200   19.0700  142.2800      10.9       116       328        92
IR     2025250     20200   19.0300  142.1800       9.7       116       328        90
IR     2025250     20200   19.0500  142.1000      10.1       116       325        93
IR     2025250     20200   19.0900  141.9300      11.5       114       290        91
IR     2025250     20200   19.0100  141.8300      11.8       121       310        91
IR     2025250     20200   19.0100  141.7300      11.2       129       341        94
IR     2025250     20200   19.0500  141.7200      11.0       128       354        94
IR     2025250     20200   19.0300  141.6200      10.2       124       387        90
IR     2025250     20200   19.0300  141.5200      11.1       118       477        93
IR     2025250     20200   19.0900  141.3700      14.9       109       554        92
IR     2025250     20200   19.0900  141.2300      14.2       109       565        93
IR     2025250     20200   19.0600  140.8800      10.9       126       553        89
IR     2025250     20200   19.0600  140.8100       8.9       120       563        81
IR     2025250     20200   19.0600  140.7300       7.1       119       558        69
IR     2025250     20200   18.9300  145.1300      11.6       134       775        82
IR     2025250     20200   18.9500  144.9400      10.0       137       871        84
IR     2025250     20200   18.9300  144.6600       8.7       124       476        80
IR     2025250     20200   18.9300  144.4100      11.8       144       483        84
IR     2025250     20200   19.0000  144.3700       9.9       134       540        85
IR     2025250     20200   18.9800  144.2000       9.0       118       745        96
IR     2025250     20200   19.0000  144.1800       9.2       122       763        93
IR     2025250     20200   18.9200  144.0800       8.8       101       800        96
IR     2025250     20200   18.9800  143.9300       9.1       112       750        99
IR     2025250     20200   18.9400  143.8800       8.7       116       739        95
IR     2025250     20200   18.9200  142.9500      10.8       116       261        72
IR     2025250     20200   18.9400  142.9100      11.6       119       250        76
IR     2025250     20200   18.9100  142.7600      12.2       122       271        77
IR     2025250     20200   18.9500  142.7200      12.8       123       276        81
IR     2025250     20200   18.9900  142.5500      12.7       123       280        72
IR     2025250     20200   18.9700  142.4500      13.4       120       287        75
IR     2025250     20200   18.9700  142.4300      13.3       119       290        75
IR     2025250     20200   18.9300  142.3100      13.4       123       306        84
IR     2025250     20200   18.9300  142.2000      10.7       126       323        93
IR     2025250     20200   18.9500  142.1400      10.5       126       325        92
IR     2025250     20200   18.9500  141.9600      10.8       120       306        93
IR     2025250     20200   18.9700  141.9500      11.2       119       307        93
IR     2025250     20200   18.9900  141.8500      11.8       121       309        89
IR     2025250     20200   18.9900  141.7500      11.1       128       330        92
IR     2025250     20200   18.9900  141.6600      10.8       126       359        94
IR     2025250     20200   18.9300  141.4800      12.7       112       495        93
IR     2025250     20200   18.9300  141.0000      11.2       128       399        80
IR     2025250     20200   18.9500  140.9000      10.3       124       393        86
IR     2025250     20200   18.9600  140.8000       8.5       116       395        85
IR     2025250     20200   18.9300  140.7800       8.4       117       381        82
IR     2025250     20200   18.9000  140.6700       9.1       118       398        81
IR     2025250     20200   18.9100  145.1300      12.2       138       773        82
IR     2025250     20200   18.9100  144.5500      10.3       140       450        79
IR     2025250     20200   18.8300  144.4200      13.7       154       475        84
IR     2025250     20200   18.8300  144.3300      14.2       154       634        82
IR     2025250     20200   18.8300  144.2300       8.5       104       753        98
IR     2025250     20200   18.9000  144.1400       8.3        95       791        98
IR     2025250     20200   18.9000  144.1000       8.5        96       797        98
IR     2025250     20200   18.9000  142.9700      10.4       115       273        71
IR     2025250     20200   18.9000  142.7800      11.8       122       264        75
IR     2025250     20200   18.8900  142.6000      13.4       124       280        74
IR     2025250     20200   18.8100  142.5000      13.6       129       240        82
IR     2025250     20200   18.8100  142.4600      13.2       128       243        83
IR     2025250     20200   18.8300  142.3100      12.7       129       237        84
IR     2025250     20200   18.8500  142.2700      12.9       130       247        84
IR     2025250     20200   18.8500  142.1300      11.4       136       290        85
IR     2025250     20200   18.8700  142.1000      11.2       133       297        86
IR     2025250     20200   18.8300  141.9200      11.7       129       291        87
IR     2025250     20200   18.8100  141.9000      11.5       129       288        88
IR     2025250     20200   18.8300  141.7900      11.5       120       304        92
IR     2025250     20200   18.8100  141.6300      11.6       116       331        98
IR     2025250     20200   18.8900  141.6100      11.6       115       359        97
IR     2025250     20200   18.8100  141.4800      12.7       119       350        96
IR     2025250     20200   18.8300  141.3400      13.8       108       360        97
IR     2025250     20200   18.8500  141.2500      12.1       103       381        95
IR     2025250     20200   18.8100  141.2100      11.6       104       371        92
IR     2025250     20200   18.8100  141.0500      10.4       119       435        86
IR     2025250     20200   18.8100  141.0100      10.7       122       418        86
IR     2025250     20200   18.8100  140.8600       9.7       118       376        88
IR     2025250     20200   18.8900  140.7600       8.6       115       373        81
IR     2025250     20200   18.8500  140.7100       9.9       116       368        85
IR     2025250     20200   18.8300  140.6500      10.2       120       389        83
IR     2025250     20200   18.7900  144.6600       8.2       105       448        80
IR     2025250     20200   18.7300  144.6300       8.6       115       446        80
IR     2025250     20200   18.7700  144.4600      13.7       155       460        74
IR     2025250     20200   18.8100  144.4200      14.3       156       475        83
IR     2025250     20200   18.7900  144.3200       9.5       116       736        90
IR     2025250     20200   18.8100  144.2100       8.6       101       753        98
IR     2025250     20200   18.8000  144.0900       8.6        90       761        95
IR     2025250     20200   18.8000  144.0500       8.8        95       757        96
IR     2025250     20200   18.8000  143.9000       9.9       120       736        88
IR     2025250     20200   18.7200  143.8200      11.8       131       724        75
IR     2025250     20200   18.7400  143.2000       6.5        89       348        75
IR     2025250     20200   18.7200  143.1800       6.7        90       344        70
IR     2025250     20200   18.7400  143.0800       8.0        97       354        70
IR     2025250     20200   18.7200  142.7700       8.9       132       235        81
IR     2025250     20200   18.7200  142.6300      11.1       132       231        85
IR     2025250     20200   18.7400  142.6100      12.2       132       231        83
IR     2025250     20200   18.7900  142.4800      13.2       129       232        83
IR     2025250     20200   18.7900  142.3500      11.8       130       227        84
IR     2025250     20200   18.7900  142.3300      11.7       131       227        84
IR     2025250     20200   18.7900  142.1700      11.2       139       239        84
IR     2025250     20200   18.7100  142.0500      11.2       139       272        88
IR     2025250     20200   18.7300  142.0300      11.3       140       275        88
IR     2025250     20200   18.7900  141.9200      11.3       130       287        88
IR     2025250     20200   18.7700  141.8200      11.1       123       291        91
IR     2025250     20200   18.7900  141.7500      11.2       118       309        97
IR     2025250     20200   18.7500  141.6500      11.3       114       318        97
IR     2025250     20200   18.7700  141.5100      12.0       120       331        92
IR     2025250     20200   18.7500  141.4000      13.3       111       338        90
IR     2025250     20200   18.7700  141.3200      13.2       109       349        94
IR     2025250     20200   18.7900  141.2100      11.7       104       367        93
IR     2025250     20200   18.7500  141.0900      10.4       112       389        92
IR     2025250     20200   18.7300  141.0700      10.5       112       385        95
IR     2025250     20200   18.7700  140.8800      10.1       118       397        89
IR     2025250     20200   18.7100  140.7000      10.8       121       404        96
IR     2025250     20200   18.7100  140.6800      10.8       121       404        96
IR     2025250     20200   18.7100  144.6700       8.7       109       446        87
IR     2025250     20200   18.6300  144.5700       9.8       123       451        71
IR     2025250     20200   18.6300  144.4900      11.1       136       467        65
IR     2025250     20200   18.6900  144.3600      15.5       157       631        80
IR     2025250     20200   18.6700  144.3200      10.7       116       749        90
IR     2025250     20200   18.6300  144.2200       9.9       111       748        89
IR     2025250     20200   18.6900  143.9300      10.5       125       732        91
IR     2025250     20200   18.6400  143.3100       7.6       105       287        64
IR     2025250     20200   18.6200  143.2100       7.6       102       295        78
IR     2025250     20200   18.6200  143.1700       8.2       103       296        82
IR     2025250     20200   18.6200  143.0400      11.0       115       235        80
IR     2025250     20200   18.6200  142.9400      11.8       125       204        74
IR     2025250     20200   18.7000  142.8300       9.0       127       221        77
IR     2025250     20200   18.7000  142.7900       8.6       130       227        80
IR     2025250     20200   18.7000  142.6300      10.6       132       226        86
IR     2025250     20200   18.7000  142.6100      11.1       132       219        85
IR     2025250     20200   18.6800  142.4600      10.7       134       216        84
IR     2025250     20200   18.7000  142.3400       9.2       134       224        85
IR     2025250     20200   18.6700  142.2600       8.8       136       233        88
IR     2025250     20200   18.6200  142.2200       8.6       137       244        91
IR     2025250     20200   18.6900  142.0700      11.1       138       266        89
IR     2025250     20200   18.6900  142.0300      11.4       138       272        88
IR     2025250     20200   18.6900  141.8800      11.9       132       279        90
IR     2025250     20200   18.6100  141.8000      13.1       134       284        88
IR     2025250     20200   18.6300  141.7000      13.5       128       299        94
IR     2025250     20200   18.6300  141.6200      12.4       121       305        97
IR     2025250     20200   18.6500  141.4900      12.0       118       315        99
IR     2025250     20200   18.6300  141.3700      12.9       110       317        98
IR     2025250     20200   18.6300  141.2800      14.1       109       322        94
IR     2025250     20200   18.6500  141.2400      13.3       107       330        89
IR     2025250     20200   18.6300  141.1200      11.7       106       340        93
IR     2025250     20200   18.6100  141.0100      11.2       107       361        95
IR     2025250     20200   18.6900  140.8000      10.2       117       422        89
IR     2025250     20200   18.6900  140.7000      10.8       121       414        95
IR     2025250     20200   18.6900  140.6800      10.7       122       408        95
IR     2025250     20200   18.5600  145.5000      13.5       147       714        83
IR     2025250     20200   18.5800  145.4800      13.9       147       711        83
IR     2025250     20200   18.5300  144.5600      10.5       119       451        79
IR     2025250     20200   18.6100  144.5100      10.4       127       467        72
IR     2025250     20200   18.5300  144.4300      11.2       120       594        68
IR     2025250     20200   18.5300  144.2900      11.2       117       752        86
IR     2025250     20200   18.6100  144.2400      10.2       112       746        88
IR     2025250     20200   18.6100  144.0600       9.1       111       740        86
IR     2025250     20200   18.5300  143.9800      10.2       126       727        87
IR     2025250     20200   18.5400  143.5900      12.6       117       373        83
IR     2025250     20200   18.5600  143.5600      11.8       118       342        84
IR     2025250     20200   18.5400  143.4600       9.9       117       263        76
IR     2025250     20200   18.6000  143.3300       7.8       111       277        67
IR     2025250     20200   18.5600  143.2100       8.1       106       270        82
IR     2025250     20200   18.5400  142.9000      11.5       124       202        74
IR     2025250     20200   18.6000  142.7800       8.7       130       218        83
IR     2025250     20200   18.6000  142.6300       9.3       133       231        85
IR     2025250     20200   18.6000  142.6100       9.7       133       230        83
IR     2025250     20200   18.6000  142.5100      10.2       135       221        79
IR     2025250     20200   18.5400  142.3700       8.1       133       245        91
IR     2025250     20200   18.6000  142.2600       8.1       134       244        92
IR     2025250     20200   18.5800  142.2200       8.8       135       251        92
IR     2025250     20200   18.6000  142.0700      12.0       132       261        89
IR     2025250     20200   18.5900  142.0100      12.7       134       272        88
IR     2025250     20200   18.5200  141.8500      14.1       119       284        92
IR     2025250     20200   18.5900  141.8200      12.8       130       283        90
IR     2025250     20200   18.5100  141.7400      14.5       122       293        94
IR     2025250     20200   18.5900  141.6000      12.4       120       303        96
IR     2025250     20200   18.5700  141.4700      11.5       114       307        99
IR     2025250     20200   18.5300  141.4500      11.7       111       302        99
IR     2025250     20200   18.5100  141.3500      12.9       107       302        99
IR     2025250     20200   18.5900  141.2000      13.6       106       324        90
IR     2025250     20200   18.5100  141.1200      13.6       105       318        90
IR     2025250     20200   18.5500  140.9900      11.8       104       343        93
IR     2025250     20200   18.5500  140.9300      11.2       105       361        94
IR     2025250     20200   18.5700  140.7600      10.4       120       441        88
IR     2025250     20200   18.4400  145.7300       7.5        44       936        85
IR     2025250     20200   18.5200  145.1300      15.8       137       801        71
IR     2025250     20200   18.4400  144.8700      13.6       138       544        77
IR     2025250     20200   18.4600  144.8500      13.7       138       492        79
IR     2025250     20200   18.4500  144.5800      11.0       129       450        81
IR     2025250     20200   18.4700  144.5600      10.8       126       451        79
IR     2025250     20200   18.5100  144.4700      11.0       120       571        75
IR     2025250     20200   18.5100  144.2900      11.2       117       757        86
IR     2025250     20200   18.4700  144.2300      10.8       117       740        88
IR     2025250     20200   18.5100  144.1500      10.5       118       740        87
IR     2025250     20200   18.4500  143.7800      11.9       117       394        71
IR     2025250     20200   18.4600  143.1100      10.6       112       215        84
IR     2025250     20200   18.4600  143.0300      11.6       122       209        83
IR     2025250     20200   18.4600  142.9100      11.9       129       204        80
IR     2025250     20200   18.4200  142.8000      10.8       133       224        84
IR     2025250     20200   18.4800  142.7600       9.6       132       229        84
IR     2025250     20200   18.4600  142.6800       8.7       125       242        85
IR     2025250     20200   18.5000  142.5500       8.5       132       243        83
IR     2025250     20200   18.5000  142.4700       8.2       131       245        92
IR     2025250     20200   18.5000  142.3700       8.5       133       252        92
IR     2025250     20200   18.4200  142.2500      11.8       134       260        83
IR     2025250     20200   18.4200  142.1400      12.5       125       264        89
IR     2025250     20200   18.4200  142.0200      14.2       114       284        93
IR     2025250     20200   18.5000  141.9300      13.9       119       287        93
IR     2025250     20200   18.4200  141.8300      15.3       113       293        92
IR     2025250     20200   18.4200  141.8100      15.1       115       293        91
IR     2025250     20200   18.4200  141.6800      14.9       120       289        91
IR     2025250     20200   18.4400  141.6200      14.3       121       291        93
IR     2025250     20200   18.4300  141.4800      12.7       115       293        99
IR     2025250     20200   18.4900  141.3500      12.9       107       300        98
IR     2025250     20200   18.4900  141.3300      13.3       107       301        97
IR     2025250     20200   18.4700  141.1600      14.4       107       305        90
IR     2025250     20200   18.4900  141.1400      14.0       105       311        89
IR     2025250     20200   18.4100  140.9800      13.6       111       319        93
IR     2025250     20200   18.4100  140.9400      12.8       112       324        94
IR     2025250     20200   18.4100  140.6700      14.2       115       318        92
IR     2025250     20200   18.3800  145.8000       6.3        28       936        83
IR     2025250     20200   18.4000  145.7600       6.5        41       935        84
IR     2025250     20200   18.3400  145.0400      15.4       147       825        61
IR     2025250     20200   18.3400  144.9600      14.8       146       792        65
IR     2025250     20200   18.3800  144.7100      11.2       131       471        83
IR     2025250     20200   18.4100  144.6000      11.1       132       454        77
IR     2025250     20200   18.3700  144.5200      11.1       125       495        77
IR     2025250     20200   18.3300  144.4000      11.4       116       609        80
IR     2025250     20200   18.3700  144.1300      10.3       116       733        80
IR     2025250     20200   18.3300  143.8700      11.6       123       388        70
IR     2025250     20200   18.3300  143.7000      12.6        99       293        86
IR     2025250     20200   18.3900  143.6800      12.7       102       309        82
IR     2025250     20200   18.3300  143.5100       9.7       119       240        64
IR     2025250     20200   18.3500  143.4700       9.5       125       234        63
IR     2025250     20200   18.3700  143.3700       9.6       129       237        64
IR     2025250     20200   18.3800  143.2000      11.3       121       214        83
IR     2025250     20200   18.3200  143.0600       9.8       113       213        82
IR     2025250     20200   18.3200  142.9500       9.9       123       217        81
IR     2025250     20200   18.3400  142.8700      10.5       129       219        84
IR     2025250     20200   18.3800  142.7900      11.4       134       226        84
IR     2025250     20200   18.3800  142.6400      10.3       128       252        89
IR     2025250     20200   18.3200  142.4200      11.4       129       251        86
IR     2025250     20200   18.4000  142.2700      11.6       134       258        82
IR     2025250     20200   18.3400  142.1700      13.9       127       260        82
IR     2025250     20200   18.3800  142.1400      13.1       124       264        87
IR     2025250     20200   18.3200  142.0000      15.6       100       288        86
IR     2025250     20200   18.3200  141.9200      16.0        95       294        92
IR     2025250     20200   18.4000  141.8300      15.2       110       293        93
IR     2025250     20200   18.3200  141.7300      13.9       116       282        95
IR     2025250     20200   18.3400  141.2500      15.4       113       288        91
IR     2025250     20200   18.3400  141.2300      15.5       111       288        91
IR     2025250     20200   18.3100  141.0600      15.8       113       297        91
IR     2025250     20200   18.3500  141.0200      14.9       111       306        94
IR     2025250     20200   18.3100  140.8800      13.7       117       314        96
IR     2025250     20200   18.3500  140.7700      14.8       112       317        92
IR     2025250     20200   18.3700  140.7300      14.7       113       317        87
IR     2025250     20200   18.3700  140.6500      15.4       112       311        87
IR     2025250     20200   18.2400  145.3100       9.5       109       735        79
IR     2025250     20200   18.3200  145.2500      11.3       117       765        79
IR     2025250     20200   18.3000  145.1500      13.9       122       919        67
IR     2025250     20200   18.2400  144.9800      13.9       139       789        67
IR     2025250     20200   18.3200  144.9600      14.6       145       778        67
IR     2025250     20200   18.2400  144.8400       7.4       101       553        89
IR     2025250     20200   18.3000  144.7300       9.6       127       536        86
IR     2025250     20200   18.2600  144.6500      10.8       135       550        84
IR     2025250     20200   18.3000  144.5300      12.4       132       551        81
IR     2025250     20200   18.2900  144.4500      12.1       124       593        79
IR     2025250     20200   18.2300  144.3500      10.6       102       615        88
IR     2025250     20200   18.2300  143.9300      10.8       113       367        76
IR     2025250     20200   18.2700  143.8100      11.4       111       343        85
IR     2025250     20200   18.2700  143.7700      11.5       107       310        86
IR     2025250     20200   18.2300  143.6200      11.7       101       234        73
IR     2025250     20200   18.2300  143.5800      11.5       105       234        71
IR     2025250     20200   18.2300  143.5000      10.5       116       223        69
IR     2025250     20200   18.2300  143.3700      12.0       130       218        81
IR     2025250     20200   18.2300  143.1000      10.4       110       214        88
IR     2025250     20200   18.2700  142.9400       9.5       116       219        85
IR     2025250     20200   18.2500  142.9000       9.7       118       222        88
IR     2025250     20200   18.3000  142.8300      11.1       129       225        84
IR     2025250     20200   18.2200  142.6500      13.4       127       241        97
IR     2025250     20200   18.2400  142.5600      12.7       123       243        98
IR     2025250     20200   18.2800  142.5000      11.8       125       246        85
IR     2025250     20200   18.3000  142.2700      13.6       125       255        81
IR     2025250     20200   18.2400  142.0900      16.8        92       266        87
IR     2025250     20200   18.2600  142.0200      16.7        94       281        82
IR     2025250     20200   18.2800  141.9400      16.1        98       289        91
IR     2025250     20200   18.2800  141.8600      15.2       101       287        93
IR     2025250     20200   18.2600  141.7900      14.4       115       276        91
IR     2025250     20200   18.2200  141.4400      16.4       115       279        94
IR     2025250     20200   18.2400  141.4200      16.4       115       281        94
IR     2025250     20200   18.2400  141.2900      16.6       115       287        96
IR     2025250     20200   18.2400  140.8000      14.9       121       314       100
IR     2025250     20200   18.2500  140.7100      16.5       119       311        85
IR     2025250     20200   18.2500  140.6500      16.0       117       309        82
IR     2025250     20200   18.1700  145.6100       5.3        43       837        62
IR     2025250     20200   18.2200  145.4200       8.0       101       715        90
IR     2025250     20200   18.1400  145.3800       7.4        84       710        65
IR     2025250     20200   18.2200  145.3100       9.2       106       735        80
IR     2025250     20200   18.1400  145.0500       9.7       112       635        90
IR     2025250     20200   18.1800  145.0100      14.3       137       791        71
IR     2025250     20200   18.2200  144.8400       7.0        96       552        92
IR     2025250     20200   18.2000  144.7600       6.1       104       547        89
IR     2025250     20200   18.2200  144.6600       9.0       126       552        83
IR     2025250     20200   18.2000  144.5500      11.2       125       597        83
IR     2025250     20200   18.2000  144.5100      11.4       118       602        84
IR     2025250     20200   18.1800  144.4100      10.9       105       599        85
IR     2025250     20200   18.1300  143.9800      11.4       114       339        72
IR     2025250     20200   18.1500  143.9200      10.8       108       327        72
IR     2025250     20200   18.1300  143.7900      10.1        97       270        84
IR     2025250     20200   18.1300  143.7100      10.2        94       245        83
IR     2025250     20200   18.2100  143.6000      11.6       103       229        72
IR     2025250     20200   18.2100  143.5000      10.7       116       219        73
IR     2025250     20200   18.1700  143.4000      11.7       127       216        84
IR     2025250     20200   18.2100  143.3900      11.9       128       217        83
IR     2025250     20200   18.1900  143.2500      11.8       123       211        83
IR     2025250     20200   18.1300  143.1500      10.8       109       218        88
IR     2025250     20200   18.1900  143.0900      10.3       107       215        88
IR     2025250     20200   18.2100  142.9200       9.7       109       222        90
IR     2025250     20200   18.2100  142.8800      10.1       113       226        89
IR     2025250     20200   18.1700  142.7300      13.9       123       232        97
IR     2025250     20200   18.1800  142.6500      14.0       123       237        98
IR     2025250     20200   18.2000  142.5700      13.6       122       240        99
IR     2025250     20200   18.1800  142.5000      14.1       117       236        98
IR     2025250     20200   18.1400  142.3600      15.6       107       234        93
IR     2025250     20200   18.1800  142.2700      16.2        99       241        93
IR     2025250     20200   18.1600  142.1900      17.4        94       245        87
IR     2025250     20200   18.2000  142.0500      18.1        89       268        85
IR     2025250     20200   18.1600  141.9600      18.6        92       271        87
IR     2025250     20200   18.1800  141.9400      17.8        92       274        90
IR     2025250     20200   18.2000  141.8400      15.4       102       274        97
IR     2025250     20200   18.1200  141.6900      13.5       113       258        91
IR     2025250     20200   18.2000  141.4000      17.2       113       280        93
IR     2025250     20200   18.1400  141.3400      17.1       112       282        95
IR     2025250     20200   18.2000  141.2500      16.6       112       290        97
IR     2025250     20200   18.1400  140.8000      15.6       125       318        97
IR     2025250     20200   18.2000  140.7500      15.5       123       313        97
IR     2025250     20200   18.1200  140.6500      15.2       125       315        97
IR     2025250     20200   18.0500  145.6500       7.5         8       856        63
IR     2025250     20200   18.0500  145.3700       7.2        61       706        87
IR     2025250     20200   18.0700  145.3000       7.2        58       753        91
IR     2025250     20200   18.1000  145.0900       8.9       100       640        92
IR     2025250     20200   18.1200  145.0700       9.4       107       639        92
IR     2025250     20200   18.0400  144.9500       8.5        92       631        93
IR     2025250     20200   18.0400  144.8100       6.4        73       543        96
IR     2025250     20200   18.0400  144.7300       5.8        80       544        93
IR     2025250     20200   18.1200  144.6600       8.2       117       562        81
IR     2025250     20200   18.1200  144.5000      11.0       103       611        86
IR     2025250     20200   18.0400  144.4800      11.2        80       589        87
IR     2025250     20200   18.1200  144.3900      10.4        87       594        87
IR     2025250     20200   18.0400  144.1700      10.2       109       297        70
IR     2025250     20200   18.0800  144.0200      11.6       114       322        65
IR     2025250     20200   18.0900  143.9800      11.4       112       326        68
IR     2025250     20200   18.0400  143.8800      10.4        99       287        77
IR     2025250     20200   18.0300  143.8000       9.9        92       266        82
IR     2025250     20200   18.1100  143.6700      10.2        95       230        81
IR     2025250     20200   18.0300  143.5300      10.8        98       217        79
IR     2025250     20200   18.1100  143.4400      11.4       122       214        83
IR     2025250     20200   18.0900  143.4200      11.5       122       215        83
IR     2025250     20200   18.1100  143.1300      10.8       107       220        88
IR     2025250     20200   18.0700  143.0100      11.4       108       226        88
IR     2025250     20200   18.1100  142.9400      10.9       105       228        90
IR     2025250     20200   18.0300  142.8400      13.6       116       229        85
IR     2025250     20200   18.0900  142.7400      14.4       112       226        97
IR     2025250     20200   18.0700  142.6700      15.6       107       220        88
IR     2025250     20200   18.1100  142.4900      15.2       105       224        90
IR     2025250     20200   18.0300  142.3900      18.3        95       217        76
IR     2025250     20200   18.0800  142.3400      17.4       100       228        86
IR     2025250     20200   18.0300  142.2800      21.0        87       224        83
IR     2025250     20200   18.0200  142.1200      22.7        85       234        84
IR     2025250     20200   18.0200  142.0100      23.1        89       238        84
IR     2025250     20200   18.0200  141.9100      21.4        94       240        85
IR     2025250     20200   18.0800  141.8600      18.6        97       256        86
IR     2025250     20200   18.1000  141.7200      14.6       111       254        86
IR     2025250     20200   18.1000  141.7000      14.1       112       256        87
IR     2025250     20200   18.0200  141.5900      14.8       109       252        83
IR     2025250     20200   18.0800  141.4700      14.9       116       262        92
IR     2025250     20200   18.0400  141.4100      14.3       112       259        91
IR     2025250     20200   18.0200  141.3000      14.3       108       263        92
IR     2025250     20200   18.0400  141.2200      14.0       102       295        96
IR     2025250     20200   18.0400  141.0700      13.2       106       308        94
IR     2025250     20200   18.0800  140.9700      14.1       118       314        99
IR     2025250     20200   18.0200  140.9100      14.6       120       313        99
IR     2025250     20200   18.1000  140.8400      15.5       128       322        94
IR     2025250     20200   18.0400  140.6700      13.9       132       322        92
IR     2025250     20200   18.0300  145.3700       7.3        58       706        88
IR     2025250     20200   17.9900  145.3500       7.7        52       710        79
IR     2025250     20200   17.9700  145.0600       8.9        88       639        99
IR     2025250     20200   18.0200  144.9300       8.3        87       629        97
IR     2025250     20200   18.0200  144.7300       6.2        67       543        94
IR     2025250     20200   17.9600  144.6700       8.1        51       544        82
IR     2025250     20200   17.9400  144.5300      11.3        69       579        81
IR     2025250     20200   17.9600  144.4800      11.5        74       573        86
IR     2025250     20200   17.9800  144.1300      10.4       112       243        62
IR     2025250     20200   18.0200  143.8800      10.5       100       282        76
IR     2025250     20200   17.9400  143.8200      10.6       100       256        83
IR     2025250     20200   17.9600  143.7200      10.3        82       234        83
IR     2025250     20200   18.0100  143.6300      10.2        86       221        85
IR     2025250     20200   17.9900  143.4700      10.7        96       217        82
IR     2025250     20200   17.9900  143.4300      10.9       104       217        84
IR     2025250     20200   18.0100  143.0900      11.3       105       226        89
IR     2025250     20200   17.9900  143.0300      12.2       112       228        85
IR     2025250     20200   17.9300  142.9300      14.3       121       223        84
IR     2025250     20200   17.9700  142.8700      13.8       119       225        85
IR     2025250     20200   17.9500  142.7000      15.3       102       208        83
IR     2025250     20200   18.0100  142.6200      16.3        99       211        79
IR     2025250     20200   17.9700  142.5100      17.8        91       210        78
IR     2025250     20200   17.9900  142.3500      19.8        92       215        80
IR     2025250     20200   17.9900  142.2600      21.9        87       217        84
IR     2025250     20200   18.0100  142.1200      22.8        87       229        84
IR     2025250     20200   18.0000  142.0300      23.5        90       234        84
IR     2025250     20200   18.0000  141.9300      22.0        94       237        85
IR     2025250     20200   18.0000  141.9100      21.7        95       238        85
IR     2025250     20200   18.0000  141.7800      19.4        99       240        87
IR     2025250     20200   17.9800  141.7200      18.3       103       241        85
IR     2025250     20200   18.0000  141.5700      15.1       110       252        86
IR     2025250     20200   17.9400  141.4700      14.3       111       251        88
IR     2025250     20200   17.9200  141.4300      13.7       110       249        88
IR     2025250     20200   17.9200  141.1400       9.8        90       287        87
IR     2025250     20200   17.9800  140.9900      12.2       109       306        95
IR     2025250     20200   17.9200  140.9300      12.4       113       305        98
IR     2025250     20200   17.9600  140.8600      14.4       120       314       100
IR     2025250     20200   17.9200  140.7600      13.6       119       316        98
IR     2025250     20200   17.9600  140.6300      13.4       127       321        86
IR     2025250     20200   17.9000  144.9000      10.0        55       626        83
IR     2025250     20200   17.8500  144.7600      12.8        24       549        82
IR     2025250     20200   17.8800  144.6900      10.4        33       533        78
IR     2025250     20200   17.8400  144.5100      11.7        63       466        86
IR     2025250     20200   17.8800  144.4700      11.7        71       524        87
IR     2025250     20200   17.8400  144.3200      10.8        78       246        77
IR     2025250     20200   17.8400  144.3000      10.7        81       238        72
IR     2025250     20200   17.8400  144.1600      10.1        88       219        69
IR     2025250     20200   17.8800  143.8500      11.1       102       252        83
IR     2025250     20200   17.8800  143.8300      10.9       100       249        83
IR     2025250     20200   17.9200  143.7000      11.0        72       233        80
IR     2025250     20200   17.8800  143.6000      11.7        69       221        82
IR     2025250     20200   17.9000  143.4700      10.7        88       216        85
IR     2025250     20200   17.8800  143.4500      10.4        93       217        86
IR     2025250     20200   17.8700  143.2700      12.1       116       222        82
IR     2025250     20200   17.8900  143.2600      12.1       116       224        83
IR     2025250     20200   17.8500  142.9700      15.8       124       213        84
IR     2025250     20200   17.8900  142.8100      14.9       118       208        80
IR     2025250     20200   17.8900  142.7900      14.8       115       208        79
IR     2025250     20200   17.8700  142.6800      15.7        96       206        84
IR     2025250     20200   17.8500  141.6600      19.6        99       235        84
IR     2025250     20200   17.8300  141.5800      18.0       101       237        84
IR     2025250     20200   17.8500  141.4800      16.4       107       241        86
IR     2025250     20200   17.9000  141.3900      13.0       110       245        90
IR     2025250     20200   17.8800  141.2900      11.3       109       243        90
IR     2025250     20200   17.8400  141.2200       9.4        98       242        89
IR     2025250     20200   17.8200  141.0800       9.0        97       268        90
IR     2025250     20200   17.8200  141.0600       9.2        97       279        90
IR     2025250     20200   17.8800  140.8900      13.0       113       302        99
IR     2025250     20200   17.8600  140.8000      13.5       116       307        99
IR     2025250     20200   17.9000  140.7800      13.8       117       314        99
IR     2025250     20200   17.8200  140.6800      12.1       125       298        97
IR     2025250     20200   17.7500  145.6700       6.2        31       924        90
IR     2025250     20200   17.7700  144.9700       9.5        61       616        84
IR     2025250     20200   17.7700  144.9300      10.1        56       616        79
IR     2025250     20200   17.8300  144.8400      12.7        30       582        73
IR     2025250     20200   17.8300  144.7600      13.1        24       560        81
IR     2025250     20200   17.7400  144.3100      11.6        70       243        79
IR     2025250     20200   17.8200  144.1800      10.2        85       216        71
IR     2025250     20200   17.7600  144.0400      10.8        88       224        80
IR     2025250     20200   17.8200  143.9900      11.0       100       234        73
IR     2025250     20200   17.7600  143.9300      10.8        95       234        81
IR     2025250     20200   17.8000  143.8100      10.7        84       237        85
IR     2025250     20200   17.7800  143.6600      12.6        65       228        83
IR     2025250     20200   17.7400  143.4000      10.1       102       212        88
IR     2025250     20200   17.7800  143.3700      10.3       106       214        86
IR     2025250     20200   17.7800  143.2100      13.2       111       218        84
IR     2025250     20200   17.7400  143.1300      14.6       116       212        86
IR     2025250     20200   17.8100  143.0800      14.6       116       219        84
IR     2025250     20200   17.7700  142.8900      15.2       118       207        82
IR     2025250     20200   17.8100  142.7500      14.7       108       206        80
IR     2025250     20200   17.7500  142.6700      15.4        99       205        80
IR     2025250     20200   17.7300  142.5600      17.4        90       206        94
IR     2025250     20200   17.7900  141.9600      19.4        95       224        85
IR     2025250     20200   17.7900  141.8900      17.9        98       226        86
IR     2025250     20200   17.8100  141.8300      19.4        99       227        86
IR     2025250     20200   17.7900  141.7300      17.9        99       226        80
IR     2025250     20200   17.8100  141.6200      19.0       100       234        84
IR     2025250     20200   17.7500  141.4800      17.8       107       234        88
IR     2025250     20200   17.8100  141.4300      15.9       109       238        85
IR     2025250     20200   17.7500  141.3100      14.3       113       238        88
IR     2025250     20200   17.8100  141.1800       9.9        98       242        89
IR     2025250     20200   17.7900  141.0800       9.7       101       253        89
IR     2025250     20200   17.8000  141.0600       9.4       100       270        91
IR     2025250     20200   17.7700  140.9700      10.0       116       288        92
IR     2025250     20200   17.7600  140.8500      10.5       122       294        93
IR     2025250     20200   17.8000  140.7000      11.8       124       296        96
IR     2025250     20200   17.7800  140.6400      11.9       128       292        93
IR     2025250     20200   17.6800  145.6200       6.4        42       906        92
IR     2025250     20200   17.6500  144.8900       9.7        55       591        89
IR     2025250     20200   17.7100  144.8100      11.5        37       577        73
IR     2025250     20200   17.7300  144.7200      10.2        37       561        84
IR     2025250     20200   17.7100  144.6200       8.8        55       438        87
IR     2025250     20200   17.7300  144.5600       9.1        69       387        95
IR     2025250     20200   17.6500  144.4000      12.0        57       310        85
IR     2025250     20200   17.6800  144.1300      11.9        69       231        84
IR     2025250     20200   17.6600  144.0800      11.6        75       224        86
IR     2025250     20200   17.7000  144.0000      11.3        87       216        88
IR     2025250     20200   17.6800  143.9000      10.8        97       228        86
IR     2025250     20200   17.6400  143.8200      10.3        95       231        84
IR     2025250     20200   17.6600  143.7300      10.9        78       232        94
IR     2025250     20200   17.7200  143.6000      11.9        76       216        92
IR     2025250     20200   17.6400  143.5000      11.2        69       207        91
IR     2025250     20200   17.7200  143.4200      10.1        97       212        89
IR     2025250     20200   17.6400  143.2800      10.6        98       207        86
IR     2025250     20200   17.6400  143.2300      11.8       109       206        87
IR     2025250     20200   17.7200  143.1300      14.6       117       210        85
IR     2025250     20200   17.7000  143.0200      15.9       116       205        85
IR     2025250     20200   17.6800  142.9600      16.1       113       204        85
IR     2025250     20200   17.6600  142.7800      15.2       103       204        79
IR     2025250     20200   17.6800  142.7700      15.2       103       204        79
IR     2025250     20200   17.6900  142.6300      15.4        96       205        90
IR     2025250     20200   17.6900  142.5400      17.0        90       206        95
IR     2025250     20200   17.6700  142.4000      20.2        87       207        91
IR     2025250     20200   17.6300  142.3000      20.8        89       206        89
IR     2025250     20200   17.6500  142.0400      18.8        97       204        93
IR     2025250     20200   17.6500  141.9600      13.1       104       205        99
IR     2025250     20200   17.6300  141.8400       7.7       121       203        86
IR     2025250     20200   17.6300  141.7900       9.7       118       205        88
IR     2025250     20200   17.6300  141.6900      12.9       111       210        99
IR     2025250     20200   17.6700  141.4400      15.4       114       221        97
IR     2025250     20200   17.6700  141.2900      15.0       118       232        96
IR     2025250     20200   17.6500  141.2500      13.6       119       234        85
IR     2025250     20200   17.7100  141.1000      10.6       110       245        84
IR     2025250     20200   17.7100  140.9800      10.0       123       264        89
IR     2025250     20200   17.6900  140.9100       9.8       130       275        92
IR     2025250     20200   17.6500  140.7900       8.9       125       282        91
IR     2025250     20200   17.6300  140.7700       8.6       124       279        90
IR     2025250     20200   17.7100  140.6400      10.5       126       290        91
IR     2025250     20200   17.6000  145.9700       8.6        47       909        73
IR     2025250     20200   17.6000  145.9100       6.5        47       842        63
IR     2025250     20200   17.6200  145.8500       4.5        57       833        62
IR     2025250     20200   17.6100  144.7900       9.7        54       559        81
IR     2025250     20200   17.5900  144.6500       8.8        68       412        96
IR     2025250     20200   17.6300  144.5900       9.4        70       385        97
IR     2025250     20200   17.6300  144.4200      11.9        56       335        89
IR     2025250     20200   17.6300  144.3400      11.9        55       281        86
IR     2025250     20200   17.6100  144.3000      11.7        53       278        86
IR     2025250     20200   17.5500  144.2000      12.1        54       262        86
IR     2025250     20200   17.5500  144.0300      10.5        86       218        90
IR     2025250     20200   17.5500  144.0100      10.5        91       216        90
IR     2025250     20200   17.5800  143.8800      10.3       100       229        85
IR     2025250     20200   17.5800  143.7400      10.3        84       231        93
IR     2025250     20200   17.5800  143.5100      11.8        65       205        88
IR     2025250     20200   17.6000  143.4600      11.1        68       205        90
IR     2025250     20200   17.6200  143.3000      10.4        90       206        90
IR     2025250     20200   17.6200  143.2300      11.6       106       203        88
IR     2025250     20200   17.5800  143.1700      12.8       106       200        85
IR     2025250     20200   17.5800  143.0500      14.2       109       199        87
IR     2025250     20200   17.5800  142.9400      14.7        98       201        86
IR     2025250     20200   17.5800  142.8200      14.2        94       202        87
IR     2025250     20200   17.5800  142.7600      13.6        98       202        85
IR     2025250     20200   17.5600  142.6100      12.2       106       203        89
IR     2025250     20200   17.5800  142.5900      12.8       101       204        92
IR     2025250     20200   17.6000  142.4200      17.3        90       204        94
IR     2025250     20200   17.6100  142.3200      20.0        90       204        88
IR     2025250     20200   17.6100  142.3000      20.4        89       204        88
IR     2025250     20200   17.6100  141.8400       6.8       127       196        82
IR     2025250     20200   17.6100  141.7100      12.1       113       203        96
IR     2025250     20200   17.5500  141.5900      11.5       110       197        99
IR     2025250     20200   17.5700  141.1900      11.6       121       232        90
IR     2025250     20200   17.5300  141.1100       9.6       124       236        91
IR     2025250     20200   17.5500  141.0000       8.4       129       242        88
IR     2025250     20200   17.5700  140.9200       7.7       133       245        85
IR     2025250     20200   17.5500  140.7700       5.5       124       253        64
IR     2025250     20200   17.5300  140.7500       4.8       125       251        64
IR     2025250     20200   17.4800  145.9800       7.9        49       931        91
IR     2025250     20200   17.5200  145.9500       7.2        48       926        89
IR     2025250     20200   17.5200  145.1900       7.1        54       420        87
IR     2025250     20200   17.4800  145.0500       9.0        50       409        94
IR     2025250     20200   17.4700  144.6600       9.3        52       388        97
IR     2025250     20200   17.4900  144.6500       9.5        57       386        98
IR     2025250     20200   17.4700  144.4700      12.1        51       365        92
IR     2025250     20200   17.5300  144.4500      11.4        58       362        95
IR     2025250     20200   17.5300  144.2800      11.5        49       286        86
IR     2025250     20200   17.4700  144.2600      12.2        42       288        83
IR     2025250     20200   17.5300  144.1500      11.3        61       249        83
IR     2025250     20200   17.5300  143.9000      10.5       102       228        85
IR     2025250     20200   17.4900  143.7800      10.0        93       227        85
IR     2025250     20200   17.5000  143.6200      11.3        68       211        93
IR     2025250     20200   17.5200  143.5700      12.0        63       206        89
IR     2025250     20200   17.5200  143.5100      12.8        58       202        84
IR     2025250     20200   17.4800  143.4100      12.0        60       198        89
IR     2025250     20200   17.4400  143.2400      10.3        82       196        89
IR     2025250     20200   17.4400  143.1800      10.8        93       195        93
IR     2025250     20200   17.4400  143.1200      12.4        91       195        96
IR     2025250     20200   17.5000  142.9500      14.3        90       198        93
IR     2025250     20200   17.4800  142.9300      14.1        87       197        96
IR     2025250     20200   17.5200  142.8400      13.5        90       200        93
IR     2025250     20200   17.5200  142.6600      11.4       111       200        86
IR     2025250     20200   17.5200  142.6400      11.5       112       200        87
IR     2025250     20200   17.4600  142.3500      14.9        95       180        93
IR     2025250     20200   17.5200  142.2800      17.6        91       183        92
IR     2025250     20200   17.5200  142.1300      15.9        98       180        87
IR     2025250     20200   17.5000  142.0100       9.1       107       177        87
IR     2025250     20200   17.5100  141.9200       5.4       123       180        81
IR     2025250     20200   17.5100  141.9000       4.8       128       180        79
IR     2025250     20200   17.5100  141.8000       5.2       127       183        71
IR     2025250     20200   17.4600  141.6600       6.9       103       182        86
IR     2025250     20200   17.4400  141.5300       5.2       104       187        85
IR     2025250     20200   17.4900  140.9800       6.5       139       241        85
IR     2025250     20200   17.4300  140.8800       4.1       164       242        76
IR     2025250     20200   17.5100  140.7300       4.3       128       249        65
IR     2025250     20200   17.4000  146.0000       7.9        49       949        93
IR     2025250     20200   17.4000  145.2000       6.5        62       367        81
IR     2025250     20200   17.3600  145.1600       6.5        55       373        73
IR     2025250     20200   17.4100  144.6600      10.8        38       386        91
IR     2025250     20200   17.4100  144.4700      12.4        46       366        86
IR     2025250     20200   17.3500  144.3700      11.9        48       319        84
IR     2025250     20200   17.4100  144.2400      11.5        46       288        92
IR     2025250     20200   17.3900  144.1400      10.5        60       260        84
IR     2025250     20200   17.3500  144.0800      10.3        64       247        82
IR     2025250     20200   17.3500  143.7300      10.7        66       221        93
IR     2025250     20200   17.3500  143.7100      10.7        64       220        93
IR     2025250     20200   17.3500  143.5600      12.6        57       201        87
IR     2025250     20200   17.3900  143.5200      13.5        54       200        86
IR     2025250     20200   17.4100  143.4100      12.7        56       196        86
IR     2025250     20200   17.4000  143.2700      11.3        65       196        88
IR     2025250     20200   17.4000  143.2200      10.7        81       195        76
IR     2025250     20200   17.4000  143.1400      12.0        83       194        91
IR     2025250     20200   17.4000  142.9700      13.6        82       194        99
IR     2025250     20200   17.3800  142.9300      13.1        78       194        99
IR     2025250     20200   17.4200  142.8100      11.0        97       196        93
IR     2025250     20200   17.3400  142.5600      10.0       107       171        85
IR     2025250     20200   17.4000  142.4900      11.5       104       180        95
IR     2025250     20200   17.4200  142.3900      13.5        98       171        93
IR     2025250     20200   17.3400  142.2200       8.8        99       158        76
IR     2025250     20200   17.3800  142.1600       9.2       100       163        78
IR     2025250     20200   17.3800  142.1000       6.2       107       163        74
IR     2025250     20200   17.4200  141.6400       5.8        98       179        85
IR     2025250     20200   17.3800  141.5500       4.7        91       181        82
IR     2025250     20200   17.4200  141.4900       4.5       100       188        77
IR     2025250     20200   17.3000  145.2200       5.4        72       380        74
IR     2025250     20200   17.3200  145.1600       6.5        55       385        67
IR     2025250     20200   17.3200  145.0200      11.5        31       404        86
IR     2025250     20200   17.2600  144.7900      10.7        39       420        88
IR     2025250     20200   17.3200  144.7300      11.1        28       412        86
IR     2025250     20200   17.2800  144.4000      13.0        48       336        81
IR     2025250     20200   17.3100  144.3700      12.4        50       319        82
IR     2025250     20200   17.3300  143.8500      10.1        65       227        87
IR     2025250     20200   17.3100  143.8300      10.3        62       225        86
IR     2025250     20200   17.3300  143.7100      10.6        63       218        93
IR     2025250     20200   17.3100  143.6000      11.4        57       201        89
IR     2025250     20200   17.2900  143.5000      13.7        46       196        84
IR     2025250     20200   17.3100  143.4000      12.3        53       194        87
IR     2025250     20200   17.3100  143.2900      11.3        61       194        89
IR     2025250     20200   17.2700  143.2100       9.7        85       193        86
IR     2025250     20200   17.3300  143.1600      11.1        82       193        84
IR     2025250     20200   17.2900  142.9800      14.5        74       192        93
IR     2025250     20200   17.2500  142.8800      14.1        76       184        71
IR     2025250     20200   17.2700  142.8700      13.2        81       185        70
IR     2025250     20200   17.2500  142.6900       9.4       120       171        81
IR     2025250     20200   17.2500  142.6500       8.8       115       160        83
IR     2025250     20200   17.3200  142.5800       9.7       107       170        85
IR     2025250     20200   17.3000  142.4100       9.1        99       159        86
IR     2025250     20200   17.2800  142.3100       7.3       101       153        76
IR     2025250     20200   17.3200  142.2200       7.5       101       155        72
IR     2025250     20200   17.3200  142.2000       7.1       101       155        73
IR     2025250     20200   17.2400  140.9500       4.3       191       225        81
IR     2025250     20200   17.2400  140.8400       4.6       184       239        81
IR     2025250     20200   17.2400  145.1200       7.0        55       403        73
IR     2025250     20200   17.1600  145.0200       9.7        44       412        81
IR     2025250     20200   17.2400  144.9000      10.8        39       422        89
IR     2025250     20200   17.2400  144.7500      10.9        37       424        90
IR     2025250     20200   17.2400  144.7300      11.3        31       423        88
IR     2025250     20200   17.2200  144.4600      13.9        33       349        83
IR     2025250     20200   17.2100  143.9600      12.9        43       228        82
IR     2025250     20200   17.2300  143.9200      12.9        45       228        84
IR     2025250     20200   17.1900  143.8200      12.4        43       219        84
IR     2025250     20200   17.1900  143.5500      12.8        36       194        86
IR     2025250     20200   17.1500  143.4600      14.0        33       192        86
IR     2025250     20200   17.1500  143.2800       8.8        60       192        98
IR     2025250     20200   17.2300  143.2500       9.0        81       192        89
IR     2025250     20200   17.2300  143.1700       9.3        90       192        74
IR     2025250     20200   17.2300  143.0600      11.4        88       191        88
IR     2025250     20200   17.2300  142.8800      14.6        73       183        71
IR     2025250     20200   17.1500  142.7700      10.0       131       167        79
IR     2025250     20200   17.2300  142.6700       8.6       117       160        82
IR     2025250     20200   17.1900  142.4200       4.8        99       144        76
IR     2025250     20200   17.2100  142.4000       5.4       101       146        76
IR     2025250     20200   17.2200  142.3100       5.4       102       140        71
IR     2025250     20200   17.2200  142.1900       5.0       103       135        62
IR     2025250     20200   17.2000  140.6300       5.1       172       242        86
IR     2025250     20200   17.1800  140.6100       5.2       171       242        87
IR     2025250     20200   17.0700  145.3800       5.2       114       396        64
IR     2025250     20200   17.0700  145.2000       4.4        60       324        66
IR     2025250     20200   17.0800  145.0100       9.2        51       408        85
IR     2025250     20200   17.0800  144.8600      11.0        54       425        91
IR     2025250     20200   17.1000  144.7800      10.8        52       425        92
IR     2025250     20200   17.0800  144.3200      10.6        66       292        85
IR     2025250     20200   17.1400  144.0500      10.4        56       223        84
IR     2025250     20200   17.1400  143.9400      13.3        39       218        84
IR     2025250     20200   17.1400  143.9200      13.6        38       217        84
IR     2025250     20200   17.1200  143.8200      12.8        39       214        83
IR     2025250     20200   17.1100  143.6700       9.5        44       198        90
IR     2025250     20200   17.0600  143.6200      10.1        40       194        87
IR     2025250     20200   17.1300  143.4500      14.1        32       192        86
IR     2025250     20200   17.1300  143.4400      14.0        33       192        86
IR     2025250     20200   17.0900  143.2800       8.7        54       193        95
IR     2025250     20200   17.0500  143.2200       6.9        66       192        83
IR     2025250     20200   17.0700  143.1500       6.2        84       190        84
IR     2025250     20200   17.0500  142.8000       9.5       138       159        74
IR     2025250     20200   17.1300  142.7600       9.7       131       165        77
IR     2025250     20200   17.0900  142.6700       5.2       112       147        61
IR     2025250     20200   17.1300  142.3800       4.1       109       132        64
IR     2025250     20200   17.0700  142.2500       6.8       115       122        88
IR     2025250     20200   17.0500  141.7700       5.4       110       134        61
IR     2025250     20200   17.0500  141.6900       5.7       128       140        68
IR     2025250     20200   17.1200  141.5800       4.4       143       149        62
IR     2025250     20200   17.0300  145.4500       4.6       124       430        73
IR     2025250     20200   17.0500  145.3800       4.9       110       387        64
IR     2025250     20200   17.0500  145.2000       4.3        62       323        65
IR     2025250     20200   17.0500  144.9900       9.2        54       408        81
IR     2025250     20200   16.9900  144.8700       9.9        58       414        88
IR     2025250     20200   16.9700  144.8100       9.4        60       422        97
IR     2025250     20200   17.0200  144.7000      10.6        42       426        92
IR     2025250     20200   17.0200  144.5600      12.2        35       418        87
IR     2025250     20200   17.0400  144.5300      12.6        35       404        88
IR     2025250     20200   16.9600  144.3500      10.6        50       311        86
IR     2025250     20200   17.0200  144.3100      10.0        63       279        86
IR     2025250     20200   16.9800  144.2400      10.1        62       243        78
IR     2025250     20200   16.9800  144.1400       9.4        68       227        80
IR     2025250     20200   17.0200  144.0300      10.4        59       217        86
IR     2025250     20200   17.0400  143.7000      10.9        30       203        83
IR     2025250     20200   16.9800  143.6200      10.5        35       195        83
IR     2025250     20200   16.9600  143.4900      13.6        35       192        80
IR     2025250     20200   16.9600  143.4300      14.0        37       192        84
IR     2025250     20200   17.0000  143.3200      10.3        39       193        90
IR     2025250     20200   17.0100  143.2200       6.2        63       192        84
IR     2025250     20200   17.0300  143.1400       5.6        79       189        84
IR     2025250     20200   17.0100  143.0900       5.0        98       184        84
IR     2025250     20200   17.0100  142.9700       6.4       121       176        77
IR     2025250     20200   16.9900  142.8400      10.0       144       160        77
IR     2025250     20200   17.0300  142.8000       9.2       139       155        67
IR     2025250     20200   16.9500  142.5100       4.5       122       126        82
IR     2025250     20200   17.0100  142.3400       6.8       115       123        89
IR     2025250     20200   16.9700  142.2400      10.1       112       122        64
IR     2025250     20200   17.0100  142.1700      10.3       115       121        75
IR     2025250     20200   16.9500  141.9000       5.3       163       126        81
IR     2025250     20200   17.0100  141.6300       6.6       152       143        72
IR     2025250     20200   16.9700  141.5700       6.6       165       147        82
IR     2025250     20200   16.9500  141.4400       7.2       168       153        79
IR     2025250     20200   17.0300  141.3700       4.3       160       158        71
IR     2025250     20200   17.0000  140.6200       5.0       154       247        62
IR     2025250     20200   16.9600  146.7100       8.9        37       919        87
IR     2025250     20200   16.8700  145.4400       4.3        66       432        79
IR     2025250     20200   16.8700  145.3500       4.2        45       265        91
IR     2025250     20200   16.9300  145.1800       6.8        35       340        75
IR     2025250     20200   16.9300  145.1600       7.3        34       345        76
IR     2025250     20200   16.8700  145.0200       7.8        55       387        93
IR     2025250     20200   16.8900  144.8900       8.6        66       408        99
IR     2025250     20200   16.8900  144.8700       8.4        67       412        99
IR     2025250     20200   16.8900  144.7700       8.9        60       424        99
IR     2025250     20200   16.9500  144.6000      11.3        40       426        91
IR     2025250     20200   16.9400  144.5000      11.2        45       407        90
IR     2025250     20200   16.8900  144.4000      11.4        35       341        86
IR     2025250     20200   16.9100  144.3700      11.2        40       320        85
IR     2025250     20200   16.9400  144.1000       9.7        60       227        84
IR     2025250     20200   16.9400  144.0000      10.4        47       221        86
IR     2025250     20200   16.9200  143.6600      10.4        22       199        83
IR     2025250     20200   16.8800  143.6000       9.4        33       195        88
IR     2025250     20200   16.9400  143.4700      13.5        37       192        82
IR     2025250     20200   16.9000  143.3700      13.1        43       192        87
IR     2025250     20200   16.8800  143.3500      12.6        44       192        86
IR     2025250     20200   16.8800  143.2300       7.1        49       191        80
IR     2025250     20200   16.9400  143.1600       4.5        67       187        85
IR     2025250     20200   16.8600  142.8900       8.8       146       157        80
IR     2025250     20200   16.9000  142.8700       9.7       149       156        80
IR     2025250     20200   16.8900  142.5600       4.0       120       128        79
IR     2025250     20200   16.9300  142.4900       5.6       127       125        87
IR     2025250     20200   16.8500  141.6700       5.8       180       140        85
IR     2025250     20200   16.8500  141.6500       5.8       177       143        86
IR     2025250     20200   16.8900  141.4800       7.1       178       153        86
IR     2025250     20200   16.8500  141.4400       7.6       177       155        86
IR     2025250     20200   16.8500  141.2800       7.8       162       159        84
IR     2025250     20200   16.8500  141.2700       7.5       158       160        83
IR     2025250     20200   16.8500  141.1300       4.4       124       170        79
IR     2025250     20200   16.9300  141.0600       5.2       103       184        64
IR     2025250     20200   16.8900  140.9000       6.2       134       196        83
IR     2025250     20200   16.8500  140.8300       6.0       156       205        77
IR     2025250     20200   16.8500  140.6800       4.6       160       230        83
IR     2025250     20200   16.8600  146.6800       8.7        45       919        86
IR     2025250     20200   16.7800  145.4200       6.7        33       479        78
IR     2025250     20200   16.8300  145.3300       4.7        34       420        66
IR     2025250     20200   16.8500  145.1500       6.7        32       353        73
IR     2025250     20200   16.8300  145.0900       6.9        46       359        78
IR     2025250     20200   16.7900  144.8200       7.5        70       416        98
IR     2025250     20200   16.8500  144.6900       9.6        55       422        98
IR     2025250     20200   16.8300  144.6500      10.1        50       419        96
IR     2025250     20200   16.8500  144.5800      11.0        42       418        90
IR     2025250     20200   16.8300  144.4000      12.6        25       355        84
IR     2025250     20200   16.8100  144.3200      13.3        24       320        83
IR     2025250     20200   16.7900  144.0700      10.9        38       240        85
IR     2025250     20200   16.7900  143.8400      13.5        22       213        83
IR     2025250     20200   16.8000  143.6700      10.8        19       203        84
IR     2025250     20200   16.8400  143.6200       9.3        29       196        83
IR     2025250     20200   16.8200  143.5400      10.5        36       192        85
IR     2025250     20200   16.7800  143.3800      11.5        43       192        86
IR     2025250     20200   16.8200  143.3300      10.6        45       191        85
IR     2025250     20200   16.8400  143.2300       6.7        50       190        79
IR     2025250     20200   16.8000  142.9100       5.4       121       157        74
IR     2025250     20200   16.8400  142.8900       7.6       140       155        73
IR     2025250     20200   16.7600  142.6600       4.1        55       126        66
IR     2025250     20200   16.7600  142.4300       9.9       134       122        62
IR     2025250     20200   16.7700  141.5900       6.4       166       150        84
IR     2025250     20200   16.7500  141.5700       5.8       166       152        80
IR     2025250     20200   16.8300  141.4200       8.0       175       156        87
IR     2025250     20200   16.8300  141.1300       4.6       129       170        77
IR     2025250     20200   16.7500  141.0500       5.6       146       174        79
IR     2025250     20200   16.7500  141.0200       5.9       148       183        85
IR     2025250     20200   16.7700  140.8600       8.8       158       196        86
IR     2025250     20200   16.8300  140.8100       6.3       160       205        77
IR     2025250     20200   16.7500  140.6900       7.2       157       218        91
IR     2025250     20200   16.7500  145.1100       7.4        46       371        72
IR     2025250     20200   16.6800  144.9900       7.2        47       366        88
IR     2025250     20200   16.7300  144.9600       6.2        62       379        92
IR     2025250     20200   16.7300  144.8400       7.1        71       413        95
IR     2025250     20200   16.6700  144.7200       8.7        57       403        98
IR     2025250     20200   16.6900  144.6500       9.9        48       394        97
IR     2025250     20200   16.6700  144.5500      10.3        37       366        90
IR     2025250     20200   16.6700  144.4500      13.0        26       354        80
IR     2025250     20200   16.7300  144.3200      15.7        16       320        83
IR     2025250     20200   16.7100  144.2800      16.6        16       304        83
IR     2025250     20200   16.6700  144.1100      13.5        26       260        83
IR     2025250     20200   16.6900  144.0900      12.7        29       255        84
IR     2025250     20200   16.6900  143.7800      11.6        32       212        84
IR     2025250     20200   16.6900  143.6900      11.4        34       206        96
IR     2025250     20200   16.6700  143.5900      10.6        45       201        94
IR     2025250     20200   16.6700  143.4700      11.5        51       195        99
IR     2025250     20200   16.6700  143.3800      10.8        53       195        96
IR     2025250     20200   16.7200  143.2700       7.2        61       191        78
IR     2025250     20200   16.7200  143.2500       6.4        61       190        72
IR     2025250     20200   16.7400  142.9200       4.2        75       157        81
IR     2025250     20200   16.7000  142.8600       5.3        49       150        74
IR     2025250     20200   16.7000  142.2000       6.3       104       206        62
IR     2025250     20200   16.7000  141.8100      11.2       174       120        79
IR     2025250     20200   16.7000  141.6400       6.5       160       127        74
IR     2025250     20200   16.7300  141.5500       5.1       167       153        73
IR     2025250     20200   16.7000  141.5100       4.2       173       156        66
IR     2025250     20200   16.7300  141.3600       7.5       174       159        85
IR     2025250     20200   16.7300  141.3400       7.9       175       160        86
IR     2025250     20200   16.7100  141.1700       6.9       154       164        82
IR     2025250     20200   16.6700  141.0900       5.4       162       169        80
IR     2025250     20200   16.7100  141.0100       5.1       158       178        84
IR     2025250     20200   16.7100  140.9400       7.0       162       190        89
IR     2025250     20200   16.6700  140.8200       8.9       158       198        83
IR     2025250     20200   16.7300  140.6900       7.6       155       216        89
IR     2025250     20200   16.6700  140.6500       8.3       158       221        90
IR     2025250     20200   16.6200  145.1600       7.4        44       451        66
IR     2025250     20200   16.6200  144.7000       8.5        55       368        95
IR     2025250     20200   16.6500  144.5500       9.9        39       364        92
IR     2025250     20200   16.6100  144.4300      13.1        25       351        82
IR     2025250     20200   16.6300  144.2200      16.2        16       296        84
IR     2025250     20200   16.6300  144.1000      14.0        25       267        84
IR     2025250     20200   16.5900  143.8000      11.4        37       216        86
IR     2025250     20200   16.5700  143.7800      11.8        37       216        86
IR     2025250     20200   16.6300  143.6100      11.4        46       202        86
IR     2025250     20200   16.6500  143.5700      10.9        49       201        95
IR     2025250     20200   16.6500  143.4900      11.5        53       197        98
IR     2025250     20200   16.6500  143.3600      10.4        56       196        93
IR     2025250     20200   16.6100  143.3000       8.9        59       196        86
IR     2025250     20200   16.6400  142.9400       6.0        28       159        78
IR     2025250     20200   16.5700  142.9000      11.5         9       156        81
IR     2025250     20200   16.5700  142.7800       8.7         2       144        66
IR     2025250     20200   16.6400  142.1900       6.2       108       251        62
IR     2025250     20200   16.5600  142.0800       5.8       132       192        63
IR     2025250     20200   16.5600  142.0600       6.2       138       184        60
IR     2025250     20200   16.5600  141.7000       9.0       170       119        95
IR     2025250     20200   16.6000  141.6000       7.3       158       128        84
IR     2025250     20200   16.5800  141.5600       6.2       153       141        83
IR     2025250     20200   16.6400  141.4500       4.5       179       159        71
IR     2025250     20200   16.5600  141.3900       6.5       178       161        75
IR     2025250     20200   16.5800  141.0500       7.4       175       169        81
IR     2025250     20200   16.5600  141.0300       7.2       174       170        77
IR     2025250     20200   16.5600  140.9000       7.7       157       190        90
IR     2025250     20200   16.5600  140.8000       9.5       149       199        89
IR     2025250     20200   16.6300  140.6900       9.5       162       210        96
IR     2025250     20200   16.5600  140.5900       9.8       174       225        93
IR     2025250     20200   16.5000  145.0800       8.5        33       297        74
IR     2025250     20200   16.5000  144.9800      10.8        30       314        83
IR     2025250     20200   16.4800  144.9600      11.4        30       319        82
IR     2025250     20200   16.5200  144.7900       8.8        56       347        80
IR     2025250     20200   16.5000  144.7700       8.9        56       343        77
IR     2025250     20200   16.5600  144.6800       9.1        50       358        94
IR     2025250     20200   16.4800  144.5000      11.9        32       355        80
IR     2025250     20200   16.4800  144.4000      12.8        28       346        82
IR     2025250     20200   16.5000  144.3700      13.0        26       336        84
IR     2025250     20200   16.4800  144.2500      13.3        22       292        83
IR     2025250     20200   16.5500  144.0200      12.6        32       248        84
IR     2025250     20200   16.5500  143.7600      12.4        37       217        85
IR     2025250     20200   16.4700  143.6600      12.6        34       214        97
IR     2025250     20200   16.5500  143.5700      12.5        50       203        95
IR     2025250     20200   16.4900  143.4100      13.0        47       207        97
IR     2025250     20200   16.4900  143.3000      10.8        41       203        97
IR     2025250     20200   16.4700  143.2200       8.1        29       191        84
IR     2025250     20200   16.5500  143.1800       4.7        54       187        83
IR     2025250     20200   16.4700  143.0500       5.4        14       168        80
IR     2025250     20200   16.5500  142.9200      10.9         9       158        81
IR     2025250     20200   16.5500  142.9000      11.5         8       156        80
IR     2025250     20200   16.5500  142.7800       8.1         0       144        68
IR     2025250     20200   16.4700  142.1700       6.2       125       185        66
IR     2025250     20200   16.4700  142.1100       7.8       137       168        78
IR     2025250     20200   16.5200  142.0600       7.1       141       174        66
IR     2025250     20200   16.4600  141.8600       7.9       179       114        64
IR     2025250     20200   16.5000  141.6900       7.5       176       119        88
IR     2025250     20200   16.5200  141.6000       7.7       164       127        81
IR     2025250     20200   16.4600  141.5800       9.0       168       136        83
IR     2025250     20200   16.4600  141.4300       9.1       173       160        86
IR     2025250     20200   16.5200  141.3900       7.9       175       162        84
IR     2025250     20200   16.4600  141.0800      10.3       185       166        92
IR     2025250     20200   16.4600  140.9700       7.9       175       173        84
IR     2025250     20200   16.5400  140.8800       8.1       156       193        90
IR     2025250     20200   16.4800  140.7600      10.4       154       202        93
IR     2025250     20200   16.5200  140.6700      11.4       161       210        95
IR     2025250     20200   16.4300  145.7300       8.0        33       801        86
IR     2025250     20200   16.4100  145.7100       8.3        34       801        84
IR     2025250     20200   16.4200  144.9400      12.4        30       319        83
IR     2025250     20200   16.4000  144.6900      10.1        44       334        86
IR     2025250     20200   16.4600  144.5400      10.7        40       353        83
IR     2025250     20200   16.4000  144.4800      11.1        33       352        80
IR     2025250     20200   16.4600  144.3800      12.3        30       342        83
IR     2025250     20200   16.4000  144.3200      10.7        32       315        85
IR     2025250     20200   16.4600  144.2300      12.2        25       289        87
IR     2025250     20200   16.4600  144.1400      11.2        31       280        88
IR     2025250     20200   16.4500  143.6600      12.6        32       215        98
IR     2025250     20200   16.3800  143.6000      11.1        28       217        97
IR     2025250     20200   16.4100  143.4600      11.8        36       210        98
IR     2025250     20200   16.4500  143.3700      12.3        40       208        98
IR     2025250     20200   16.4500  143.2400       9.4        26       196        85
IR     2025250     20200   16.3900  143.2100       8.9        18       191        84
IR     2025250     20200   16.3900  143.1200       5.9        14       178        80
IR     2025250     20200   16.4100  143.0100       6.9        10       165        77
IR     2025250     20200   16.4500  142.8700      10.1         5       156        78
IR     2025250     20200   16.3900  142.8300       8.8         5       154        76
IR     2025250     20200   16.4500  142.1500       6.8       132       169        72
IR     2025250     20200   16.4100  142.0700       7.2       147       142        77
IR     2025250     20200   16.4500  141.9800       8.2       163       126        66
IR     2025250     20200   16.4500  141.8600       7.3       181       113        68
IR     2025250     20200   16.3700  141.7800       5.4       178       113        68
IR     2025250     20200   16.4400  141.6900       7.8       178       118        77
IR     2025250     20200   16.4400  141.5600       9.6       169       144        81
IR     2025250     20200   16.4400  141.4300       9.6       174       160        86
IR     2025250     20200   16.4400  141.3700       9.9       180       164        86
IR     2025250     20200   16.4400  141.0600      10.3       184       166        92
IR     2025250     20200   16.4400  140.9700       8.4       174       173        85
IR     2025250     20200   16.3600  140.9300       9.9       168       177        90
IR     2025250     20200   16.4200  140.8600       8.8       164       193        89
IR     2025250     20200   16.4000  140.6800      10.9       161       210        94
IR     2025250     20200   16.4000  140.6100      10.3       165       216        89
IR     2025250     20200   16.2900  145.8000       6.4        32       811        80
IR     2025250     20200   16.3500  145.6500       8.6        41       797        85
IR     2025250     20200   16.3700  144.9600      11.1        35       284        84
IR     2025250     20200   16.3100  144.9100      11.9        36       296        83
IR     2025250     20200   16.3500  144.8400      13.1        36       316        83
IR     2025250     20200   16.3300  144.6900      10.5        39       318        81
IR     2025250     20200   16.2900  144.6500       9.1        37       313        85
IR     2025250     20200   16.3600  144.4800      11.2        33       347        84
IR     2025250     20200   16.2800  144.4300      10.3        31       334        88
IR     2025250     20200   16.3600  144.3000      10.1        34       294        84
IR     2025250     20200   16.3200  144.2600       9.7        35       287        85
IR     2025250     20200   16.3200  144.1100       8.7        37       282        90
IR     2025250     20200   16.3000  144.0700       9.1        39       284        90
IR     2025250     20200   16.3400  143.7300      13.0        31       233        99
IR     2025250     20200   16.2800  143.6900      11.9        27       235        93
IR     2025250     20200   16.3400  143.5900      11.0        25       219        92
IR     2025250     20200   16.3600  143.5200      10.3        27       214        95
IR     2025250     20200   16.2800  143.4000       9.7        10       212        85
IR     2025250     20200   16.3200  143.2500       9.7         6       197        87
IR     2025250     20200   16.3500  143.1600       6.7        10       182        84
IR     2025250     20200   16.3500  143.1400       6.3        10       180        84
IR     2025250     20200   16.3500  143.0000       6.8        12       166        74
IR     2025250     20200   16.2800  142.9400       6.4        17       163        66
IR     2025250     20200   16.3100  141.5900       9.5       165       139        72
IR     2025250     20200   16.3300  141.5200      10.9       169       154        79
IR     2025250     20200   16.3500  141.3500      12.6       178       167        88
IR     2025250     20200   16.2900  141.3300      13.4       177       168        86
IR     2025250     20200   16.3500  141.0400      11.8       184       168        93
IR     2025250     20200   16.3400  140.9300      10.2       167       177        90
IR     2025250     20200   16.2900  140.8300      11.9       159       194        95
IR     2025250     20200   16.3200  140.7400      11.5       153       206        97
IR     2025250     20200   16.2700  140.6800      11.2       153       215        95
IR     2025250     20200   16.2600  145.7800       6.6        28       811        83
IR     2025250     20200   16.2300  145.0800       4.3        80       245        84
IR     2025250     20200   16.1900  145.0400       5.3        95       230        84
IR     2025250     20200   16.2700  144.8700      11.8        39       281        83
IR     2025250     20200   16.2500  144.8000      11.6        40       276        82
IR     2025250     20200   16.2300  144.7400      10.4        38       284        83
IR     2025250     20200   16.2500  144.6200       7.6        38       312        83
IR     2025250     20200   16.2700  144.5300       9.1        30       332        91
IR     2025250     20200   16.2700  144.4300       9.8        31       332        89
IR     2025250     20200   16.2100  144.3400      10.6        35       308        83
IR     2025250     20200   16.2300  144.2800      10.6        33       294        83
IR     2025250     20200   16.1900  144.1800       9.1        41       291        77
IR     2025250     20200   16.2400  144.0100       8.7        41       285        85
IR     2025250     20200   16.2400  143.9900       8.7        42       284        85
IR     2025250     20200   16.2000  143.8400      10.1        35       262        82
IR     2025250     20200   16.2000  143.8000      10.5        34       258        80
IR     2025250     20200   16.2600  143.6900      11.5        27       237        91
IR     2025250     20200   16.2000  143.5300       9.8        22       223        87
IR     2025250     20200   16.1800  143.5100       9.8        21       223        91
IR     2025250     20200   16.2400  143.3600       9.2         6       210        93
IR     2025250     20200   16.2200  143.2500       7.9         1       190        86
IR     2025250     20200   16.2000  143.2100       6.6         4       181        83
IR     2025250     20200   16.2600  143.1100       5.8         2       176        83
IR     2025250     20200   16.2200  143.0200       4.6        14       172        62
IR     2025250     20200   16.2300  142.3700       4.1       325       123        75
IR     2025250     20200   16.1700  141.6300       7.3       151       145        62
IR     2025250     20200   16.1900  141.5500       8.1       158       154        69
IR     2025250     20200   16.1700  141.4800       8.4       165       161        72
IR     2025250     20200   16.2300  141.4200      10.9       169       164        76
IR     2025250     20200   16.2300  141.3300      13.0       175       169        82
IR     2025250     20200   16.1700  141.0200      11.5       171       173        75
IR     2025250     20200   16.2300  140.9600      11.3       167       176        72
IR     2025250     20200   16.1900  140.8100      10.6       149       197        84
IR     2025250     20200   16.2300  140.7200      10.3       148       212        91
IR     2025250     20200   16.1900  140.6800       9.6       147       216        87
IR     2025250     20200   16.1700  145.0600       5.0        99       232        83
IR     2025250     20200   16.1300  144.9400       6.1        76       228        83
IR     2025250     20200   16.1300  144.7900       8.1        51       240        79
IR     2025250     20200   16.0900  144.7500       6.8        53       246        83
IR     2025250     20200   16.1500  144.6600       7.2        41       292        75
IR     2025250     20200   16.0900  144.5800       6.1        37       308        80
IR     2025250     20200   16.1700  144.4700       8.9        32       326        87
IR     2025250     20200   16.1700  144.3700      10.2        34       318        83
IR     2025250     20200   16.0900  144.2200      10.7        41       299        74
IR     2025250     20200   16.1300  144.1800       9.5        44       295        67
IR     2025250     20200   16.0900  144.0800       8.2        44       298        60
IR     2025250     20200   16.0900  143.9700       7.5        39       293        62
IR     2025250     20200   16.1100  143.8700       9.2        32       282        68
IR     2025250     20200   16.0900  143.7600      11.2        30       271        69
IR     2025250     20200   16.0900  143.6600      11.8        31       258        71
IR     2025250     20200   16.0900  143.5700      11.4        33       243        72
IR     2025250     20200   16.1400  143.4900       9.6        23       223        91
IR     2025250     20200   16.1000  143.4300       8.6        22       220        76
IR     2025250     20200   16.1600  143.3400       7.5         7       205        83
IR     2025250     20200   16.1400  143.2400       5.7        14       183        70
IR     2025250     20200   16.1400  143.1100       4.0        28       176        67
IR     2025250     20200   16.0800  142.2900       6.2       269       123        64
IR     2025250     20200   16.0800  141.7600       7.7       140       134        62
IR     2025250     20200   16.1000  141.5900       6.8       150       156        62
IR     2025250     20200   16.1300  141.4700       7.6       163       163        72
IR     2025250     20200   16.0800  141.3600       9.9       176       170        73
IR     2025250     20200   16.0800  141.3400      10.7       177       170        71
IR     2025250     20200   16.0900  141.0400      11.3       163       175        68
IR     2025250     20200   16.0700  140.9800      10.1       158       186        72
IR     2025250     20200   16.1500  140.8700      11.2       150       193        83
IR     2025250     20200   16.1300  140.7700       9.8       145       204        82
IR     2025250     20200   16.1300  140.6600       9.4       150       218        78
IR     2025250     20200   16.0500  147.1700       8.9        37       944        99
IR     2025250     20200   16.0000  145.8000       7.7        29       828        81
IR     2025250     20200   16.0000  145.7600       7.4        28       827        80
IR     2025250     20200   16.0000  145.0000       5.7       104       223        84
IR     2025250     20200   16.0200  144.9000       5.1        90       223        82
IR     2025250     20200   16.0700  144.7500       6.3        57       240        80
IR     2025250     20200   16.0400  144.7300       5.8        62       238        73
IR     2025250     20200   16.0000  144.5700       6.4        42       290        80
IR     2025250     20200   16.0000  144.4800       7.9        30       320        78
IR     2025250     20200   15.9900  144.4400       8.5        30       325        79
IR     2025250     20200   15.9900  144.2900      10.5        34       325        80
IR     2025250     20200   16.0300  144.2100      10.2        39       306        78
IR     2025250     20200   16.0700  144.1600       8.9        43       298        65
IR     2025250     20200   15.9900  144.0400       6.0        44       295        63
IR     2025250     20200   16.0100  143.9400       7.5        33       295        65
IR     2025250     20200   16.0500  143.7900      11.3        28       278        73
IR     2025250     20200   16.0500  143.7700      11.5        28       277        72
IR     2025250     20200   16.0100  143.6800      11.9        30       271        81
IR     2025250     20200   16.0600  142.3100       5.9       263       125        62
IR     2025250     20200   16.0000  142.1900       4.4       242       128        60
IR     2025250     20200   15.9800  141.8500       6.7       133       137        64
IR     2025250     20200   16.0600  141.7800       7.5       138       135        65
IR     2025250     20200   16.0600  141.4700       6.1       168       165        66
IR     2025250     20200   16.0600  141.3200      11.0       179       171        69
IR     2025250     20200   16.0000  141.0900      10.9       161       177        62
IR     2025250     20200   15.9800  140.9800       8.6       158       190        74
IR     2025250     20200   16.0500  140.8700       8.7       147       196        80
IR     2025250     20200   16.0000  140.7700       6.3       143       205        74
IR     2025250     20200   16.0000  140.7300       6.8       141       213        74
IR     2025250     20200   16.0300  140.6000       8.1       160       221        67
IR     2025250     20200   15.9100  145.7200       6.4        32       844        78
IR     2025250     20200   15.9100  145.5100       7.6        30       850        72
IR     2025250     20200   15.9600  144.9700       5.6       104       223        84
IR     2025250     20200   15.9200  144.9500       5.4        98       223        82
IR     2025250     20200   15.9000  144.7800       5.8        98       218        81
IR     2025250     20200   15.9400  144.7200       5.5        83       223        64
IR     2025250     20200   15.9800  144.5900       6.4        46       274        81
IR     2025250     20200   15.9600  144.5500       6.9        40       294        78
IR     2025250     20200   15.9400  144.4200       8.3        33       324        73
IR     2025250     20200   15.9000  144.3200       9.1        36       329        84
IR     2025250     20200   15.9400  144.2500       9.4        39       326        82
IR     2025250     20200   15.9400  144.1300       6.5        39       307        79
IR     2025250     20200   15.9000  144.0500       4.8        21       295        73
IR     2025250     20200   15.9500  143.9800       5.8        34       290        71
IR     2025250     20200   15.9300  143.8600       8.6        28       289        81
IR     2025250     20200   15.9100  143.7500      10.6        26       290        82
IR     2025250     20200   15.8900  143.6900      10.3        28       290        85
IR     2025250     20200   15.8900  143.5400      10.1        35       262        85
IR     2025250     20200   15.8900  143.5200       9.9        36       256        86
IR     2025250     20200   15.8900  143.4200       8.2        34       225        74
IR     2025250     20200   15.9400  142.2900       4.1       245       138        82
IR     2025250     20200   15.9600  141.8700       6.3       134       138        65
IR     2025250     20200   15.8800  141.7700       5.1       179       154        60
IR     2025250     20200   15.9400  141.7000       5.0       152       156        62
IR     2025250     20200   15.9000  141.2400       9.7       174       177        61
IR     2025250     20200   15.9600  141.1100      10.7       160       182        63
IR     2025250     20200   15.8800  140.9800       6.5       165       195        87
IR     2025250     20200   15.8800  140.9600       6.0       165       197        86
IR     2025250     20200   15.9000  140.8600       5.3       157       200        74
IR     2025250     20200   15.8800  140.7500       4.7       153       213        62
IR     2025250     20200   15.9000  140.6500       6.3       162       219        64
IR     2025250     20200   15.8100  145.6000       8.3        30       870        95
IR     2025250     20200   15.8900  145.5100       7.8        31       852        72
IR     2025250     20200   15.8800  144.7800       5.8        96       218        80
IR     2025250     20200   15.8800  144.7200       6.0        84       219        69
IR     2025250     20200   15.8200  144.5900       6.5        60       229        89
IR     2025250     20200   15.8000  144.5700       6.3        60       238        86
IR     2025250     20200   15.8400  144.4500       7.5        36       319        86
IR     2025250     20200   15.8000  144.3600       7.9        34       327        87
IR     2025250     20200   15.8800  144.2300       8.8        35       327        84
IR     2025250     20200   15.8800  144.1100       5.9        21       309        87
IR     2025250     20200   15.8400  144.0300       5.0         7       282        77
IR     2025250     20200   15.8800  143.9200       6.5        17       281        90
IR     2025250     20200   15.8600  143.9000       6.6        17       279        91
IR     2025250     20200   15.8400  143.5700       8.9        31       289        84
IR     2025250     20200   15.8700  143.5200       9.6        36       260        85
IR     2025250     20200   15.8700  143.4000       7.5        30       217        69
IR     2025250     20200   15.8500  143.3300       5.9        20       202        63
IR     2025250     20200   15.8300  142.3200       5.2       268       151        73
IR     2025250     20200   15.8300  142.3000       5.4       266       150        77
IR     2025250     20200   15.7900  142.1700       6.5       265       150        83
IR     2025250     20200   15.8300  141.8500       5.1       193       153        75
IR     2025250     20200   15.8700  141.7900       5.9       194       155        77
IR     2025250     20200   15.7900  141.1800       7.1       166       185        61
IR     2025250     20200   15.8600  141.1500       9.3       160       184        69
IR     2025250     20200   15.8200  141.0100       6.4       171       196        88
IR     2025250     20200   15.8600  140.9700       6.0       169       196        88
IR     2025250     20200   15.8000  140.6100       6.5       178       221        71
IR     2025250     20200   15.7800  140.5900       6.7       183       222        71
IR     2025250     20200   15.7900  145.7100       7.1        39       875        92
IR     2025250     20200   15.7300  145.6200       7.7        32       873        86
IR     2025250     20200   15.7200  144.4300       7.6        45       317        82
IR     2025250     20200   15.7800  144.3000       8.5        32       330        87
IR     2025250     20200   15.7200  144.1600       7.0        16       317        82
IR     2025250     20200   15.7600  144.0900       5.9        10       305        87
IR     2025250     20200   15.7800  143.9900       5.3         2       280        82
IR     2025250     20200   15.7000  143.8700       5.9        16       297        84
IR     2025250     20200   15.7800  143.8600       6.5        16       290        86
IR     2025250     20200   15.6900  142.4100       9.1       274       173        80
IR     2025250     20200   15.6900  142.3200      11.9       269       168        83
IR     2025250     20200   15.6900  142.3000      12.2       269       167        83
IR     2025250     20200   15.6900  142.1600       9.5       263       166        82
IR     2025250     20200   15.6900  141.7500       6.6       235       169        72
IR     2025250     20200   15.6900  141.6700       6.1       234       174        80
IR     2025250     20200   15.7500  141.5400       4.3       175       179        68
IR     2025250     20200   15.7500  141.1200       6.8       170       192        71
IR     2025250     20200   15.7700  141.0500       6.6       176       196        85
IR     2025250     20200   15.6900  140.9700       6.3       194       199        90
IR     2025250     20200   15.6900  140.8200       4.9       180       204        81
IR     2025250     20200   15.7500  140.7800       4.6       170       210        67
IR     2025250     20200   15.6900  140.6100       7.2       196       224        85
IR     2025250     20200   15.7300  140.5900       6.7       192       223        81
IR     2025250     20200   15.6800  145.7500       7.7        39       865        94
IR     2025250     20200   15.6900  145.6300       6.7        36       881        81
IR     2025250     20200   15.6100  144.5800       5.7        82       241        84
IR     2025250     20200   15.6900  144.4800       6.4        65       286        63
IR     2025250     20200   15.6300  144.4100       7.4        46       295        73
IR     2025250     20200   15.6100  144.1400       6.8        25       305        83
IR     2025250     20200   15.6800  144.0300       5.9         8       297        69
IR     2025250     20200   15.6600  143.9700       5.6         7       293        81
IR     2025250     20200   15.6800  143.8700       5.9        16       299        85
IR     2025250     20200   15.6100  143.7400       7.1        21       345        82
IR     2025250     20200   15.6200  143.7200       7.2        23       346        85
IR     2025250     20200   15.6800  143.4500       7.1        15       273        85
IR     2025250     20200   15.6000  143.3600       5.9         4       253        74
IR     2025250     20200   15.6000  142.8800       4.3       350       193        80
IR     2025250     20200   15.6600  142.4500       9.0       271       177        69
IR     2025250     20200   15.6800  142.4100       9.9       271       175        79
IR     2025250     20200   15.6800  142.3100      12.6       268       169        83
IR     2025250     20200   15.6700  142.2000      11.4       267       167        91
IR     2025250     20200   15.6000  142.1200       7.8       265       170        61
IR     2025250     20200   15.6700  141.6700       5.0       237       176        78
IR     2025250     20200   15.6500  141.0800       5.5       192       201        83
IR     2025250     20200   15.5900  140.9300       7.3       194       205        89
IR     2025250     20200   15.6700  140.8200       5.3       182       205        82
IR     2025250     20200   15.6700  140.8000       5.3       181       210        79
IR     2025250     20200   15.6700  140.6300       7.4       197       223        85
IR     2025250     20200   15.5200  145.5900       7.7        31       909        95
IR     2025250     20200   15.5400  145.4700       7.7        28       880        97
IR     2025250     20200   15.5900  144.5800       5.5        84       242        84
IR     2025250     20200   15.5300  144.4800       5.2        81       270        63
IR     2025250     20200   15.5700  143.8500       6.6        20       307        87
IR     2025250     20200   15.5700  143.7400       7.0        19       344        85
IR     2025250     20200   15.5100  143.5800       6.9       355       354        91
IR     2025250     20200   15.5300  143.5400       6.7       357       348        88
IR     2025250     20200   15.5400  143.2200       4.5         5       228        62
IR     2025250     20200   15.5300  143.2000       4.3         6       228        60
IR     2025250     20200   15.5600  142.9800       4.0       352       206        60
IR     2025250     20200   15.5600  142.5600       5.4       286       186        79
IR     2025250     20200   15.5600  142.5400       6.2       283       185        82
IR     2025250     20200   15.5400  142.4100      11.3       273       183        92
IR     2025250     20200   15.5200  142.2700      12.7       273       179        83
IR     2025250     20200   15.5600  142.2200      11.4       271       177        86
IR     2025250     20200   15.5800  142.1400       8.6       267       171        63
IR     2025250     20200   15.5000  141.9900       4.4       280       178        66
IR     2025250     20200   15.5700  140.9500       7.2       195       205        90
IR     2025250     20200   15.5700  140.9300       7.3       194       205        89
IR     2025250     20200   15.5000  140.7800       6.5       190       222        85
IR     2025250     20200   15.5700  140.7000       7.2       194       225        88
IR     2025250     20200   15.5300  140.6300       7.1       203       234        81
IR     2025250     20200   15.4800  144.7200       5.2        98       199        61
IR     2025250     20200   15.4400  144.6600       5.4       106       215        61
IR     2025250     20200   15.4200  144.4900       5.0        85       261        60
IR     2025250     20200   15.4500  144.3000       5.4        33       285        68
IR     2025250     20200   15.4200  144.1100       4.9        31       295        76
IR     2025250     20200   15.4500  143.9800       4.9        39       290        85
IR     2025250     20200   15.4700  143.8800       5.7        32       293        82
IR     2025250     20200   15.4900  143.7700       6.5        21       324        88
IR     2025250     20200   15.4100  143.6500       6.5       357       339        89
IR     2025250     20200   15.4300  143.6000       6.7       347       351        91
IR     2025250     20200   15.4900  143.5400       6.8       349       356        86
IR     2025250     20200   15.4500  143.4100       6.4       344       306        89
IR     2025250     20200   15.4100  143.1800       4.7        15       235        66
IR     2025250     20200   15.4100  142.6300       4.1       296       193        65
IR     2025250     20200   15.4100  142.5700       6.2       287       191        77
IR     2025250     20200   15.4400  142.4800       9.2       280       188        88
IR     2025250     20200   15.4100  142.3400      10.7       278       187        90
IR     2025250     20200   15.4100  142.3300      10.6       279       186        89
IR     2025250     20200   15.4200  142.2300      10.1       279       183        81
IR     2025250     20200   15.4400  142.0600       7.2       287       182        77
IR     2025250     20200   15.4400  142.0400       6.6       287       183        76
IR     2025250     20200   15.4200  141.0200       4.2       207       208        76
IR     2025250     20200   15.4200  140.8700       5.9       197       210        76
IR     2025250     20200   15.4800  140.7800       6.4       192       223        82
IR     2025250     20200   15.4800  140.7600       6.3       194       227        83
IR     2025250     20200   15.4400  140.5900       7.7       203       242        88
IR     2025250     20200   15.3200  144.8700       5.3        64       245        73
IR     2025250     20200   15.3600  144.6400       6.3       112       201        65
IR     2025250     20200   15.3200  144.5300       5.6        93       231        68
IR     2025250     20200   15.4000  144.1300       4.7        29       295        73
IR     2025250     20200   15.3400  143.9700       4.5        52       288        84
IR     2025250     20200   15.3400  143.9500       4.7        55       287        84
IR     2025250     20200   15.3200  143.6300       5.5         2       321        88
IR     2025250     20200   15.3500  143.5600       5.8       351       335        88
IR     2025250     20200   15.3500  143.4400       5.5       347       324        89
IR     2025250     20200   15.3900  143.1800       4.5        15       239        63
IR     2025250     20200   15.3700  142.5900       5.8       288       193        68
IR     2025250     20200   15.3100  142.5100       8.5       282       193        74
IR     2025250     20200   15.3900  142.4200      10.7       280       188        93
IR     2025250     20200   15.3900  142.3600      10.5       280       188        88
IR     2025250     20200   15.3700  142.2100       8.4       277       188        74
IR     2025250     20200   15.3700  142.1900       8.2       277       188        73
IR     2025250     20200   15.3900  142.1000       7.3       279       188        81
IR     2025250     20200   15.3900  141.9800       4.9       275       189        70
IR     2025250     20200   15.3600  140.9600       4.8       201       208        71
IR     2025250     20200   15.3000  140.8500       5.1       195       223        72
IR     2025250     20200   15.3600  140.7400       5.6       202       234        80
IR     2025250     20200   15.3600  140.7200       5.6       203       237        80
IR     2025250     20200   15.2600  147.2800       4.1        64       783        72
IR     2025250     20200   15.3000  144.8700       5.3        65       257        72
IR     2025250     20200   15.2400  144.5200       5.7        89       195        96
IR     2025250     20200   15.2400  144.1400       4.3        25       279        66
IR     2025250     20200   15.2800  143.9700       4.0        61       285        78
IR     2025250     20200   15.2600  143.8800       4.9        66       286        83
IR     2025250     20200   15.2800  143.8400       4.8        58       283        82
IR     2025250     20200   15.3000  143.5200       5.2       350       324        87
IR     2025250     20200   15.2200  143.4200       4.0         5       301        84
IR     2025250     20200   15.2200  143.3800       4.1        12       298        84
IR     2025250     20200   15.2900  142.5300       7.5       280       194        72
IR     2025250     20200   15.2900  142.4500       9.5       277       192        79
IR     2025250     20200   15.2100  142.3200       9.6       263       197        86
IR     2025250     20200   15.2100  142.3000       9.8       262       197        86
IR     2025250     20200   15.2300  142.2100       9.9       258       196        91
IR     2025250     20200   15.2500  142.0400       8.2       265       193        89
IR     2025250     20200   15.2700  141.9600       6.3       277       192        78
IR     2025250     20200   15.2100  140.9000       4.1       202       225        60
IR     2025250     20200   15.2900  140.8500       4.9       194       225        74
IR     2025250     20200   15.2800  140.7500       5.4       205       232        72
IR     2025250     20200   15.2100  140.7000       5.9       215       234        69
IR     2025250     20200   15.2300  147.3800       4.2        84       789        62
IR     2025250     20200   15.2300  147.2800       4.3        81       780        77
IR     2025250     20200   15.1300  143.9700       4.8        55       288        83
IR     2025250     20200   15.1500  143.9500       4.6        59       286        83
IR     2025250     20200   15.1800  143.8500       4.1        70       282        80
IR     2025250     20200   15.1400  143.4200       4.2         8       293        84
IR     2025250     20200   15.1400  143.3600       4.3        14       291        84
IR     2025250     20200   15.1400  142.6600       4.1       287       207        79
IR     2025250     20200   15.1600  142.5100       7.1       270       202        89
IR     2025250     20200   15.1600  142.4700       7.7       267       202        88
IR     2025250     20200   15.1200  142.3400       8.7       261       207        88
IR     2025250     20200   15.1900  142.2200      10.4       257       199        92
IR     2025250     20200   15.1600  142.1100       9.8       254       201        87
IR     2025250     20200   15.1400  142.0700       8.8       258       200        80
IR     2025250     20200   15.1200  141.9800       5.4       274       198        65
IR     2025250     20200   15.1900  140.8100       5.5       203       232        64
IR     2025250     20200   15.1100  140.7500       6.1       213       233        74
IR     2025250     20200   15.1300  140.6400       5.7       211       231        65
IR     2025250     20200   15.0700  147.4600       4.6        89       795        67
IR     2025250     20200   15.1100  144.7600       5.4        68       469        61
IR     2025250     20200   15.0900  144.6300       6.0        91       186        91
IR     2025250     20200   15.1100  144.3300       6.4        50       208        80
IR     2025250     20200   15.0500  144.2700       7.3        42       220        73
IR     2025250     20200   15.0300  144.1500       6.7        35       254        82
IR     2025250     20200   15.1100  144.1000       5.9        33       273        83
IR     2025250     20200   15.1100  143.9800       5.1        51       287        82
IR     2025250     20200   15.0500  143.9100       4.9        54       302        68
IR     2025250     20200   15.1000  143.4700       4.2        14       284        83
IR     2025250     20200   15.1000  143.3400       4.1        14       286        84
IR     2025250     20200   15.0600  142.5800       4.4       281       217        85
IR     2025250     20200   15.0800  142.4300       7.0       265       212        92
IR     2025250     20200   15.1000  142.3900       7.7       263       210        88
IR     2025250     20200   15.0200  142.2900       7.9       265       214        82
IR     2025250     20200   15.0200  142.1200       7.0       268       206        74
IR     2025250     20200   15.0200  142.1100       6.7       268       205        71
IR     2025250     20200   15.0200  140.8200       4.7       218       238        68
IR     2025250     20200   15.0200  140.7300       5.2       219       237        79
IR     2025250     20200   15.0700  140.6400       5.5       215       230        68
IR     2025250     20200   15.0900  140.5800       5.4       207       233        68
IR     2025250     20200   14.9600  144.5300       6.2        76       172        82
IR     2025250     20200   14.9400  144.3200       8.6        52       184        91
IR     2025250     20200   14.9400  144.2200       8.4        48       208        90
IR     2025250     20200   14.9400  144.1500       8.2        47       229        82
IR     2025250     20200   14.9900  144.0400       6.6        42       279        77
IR     2025250     20200   14.9500  143.6200       5.7        30       281        69
IR     2025250     20200   14.9300  143.4500       5.5        38       267        70
IR     2025250     20200   14.9500  142.7100       4.1       298       230        91
IR     2025250     20200   14.9900  142.5800       4.4       291       228        86
IR     2025250     20200   15.0000  142.5400       4.6       285       227        91
IR     2025250     20200   15.0000  142.3900       5.9       272       222        88
IR     2025250     20200   14.9800  142.3100       6.5       271       217        87
IR     2025250     20200   15.0000  140.8200       4.6       222       238        66
IR     2025250     20200   15.0000  140.7100       4.9       222       237        73
IR     2025250     20200   14.9600  140.6000       4.9       212       239        81
IR     2025250     20200   14.8600  144.5800       5.5        83       173        81
IR     2025250     20200   14.8800  144.5300       6.3        83       173        79
IR     2025250     20200   14.9000  144.2600       8.9        52       196        88
IR     2025250     20200   14.8600  144.1600       8.4        55       208        91
IR     2025250     20200   14.9200  144.0300       8.4        51       261        78
IR     2025250     20200   14.8600  143.9400       8.4        55       247        81
IR     2025250     20200   14.8600  143.8600       8.3        54       272        81
IR     2025250     20200   14.8400  143.8000       7.5        49       261        79
IR     2025250     20200   14.8400  143.5200       5.9        49       273        70
IR     2025250     20200   14.8400  143.4600       5.7        49       275        70
IR     2025250     20200   14.9100  142.7400       4.0       301       231        89
IR     2025250     20200   14.8300  142.5700       4.1       297       222        68
IR     2025250     20200   14.8500  142.5200       4.0       294       224        70
IR     2025250     20200   14.9000  140.6300       4.6       210       242        72
IR     2025250     20200   14.8200  144.4900       7.1        73       173        90
IR     2025250     20200   14.8200  144.3700       7.7        60       176        95
IR     2025250     20200   14.8200  144.2600       8.6        60       182        89
IR     2025250     20200   14.8200  144.1800       8.5        60       196        91
IR     2025250     20200   14.8200  144.0500       8.2        62       220        84
IR     2025250     20200   14.8200  143.9300       8.1        59       230        82
IR     2025250     20200   14.8000  143.7400       6.5        44       239        82
IR     2025250     20200   14.8200  143.4400       5.4        47       280        65
IR     2025250     20200   14.8000  143.3500       5.0        38       283        65
IR     2025250     20200   14.8100  142.5500       4.1       295       222        64
IR     2025250     20200   14.6500  144.5700       4.6        56       197        92
IR     2025250     20200   14.6700  144.3100       6.3        73       180        95
IR     2025250     20200   14.7300  144.1400       7.8        68       185        95
IR     2025250     20200   14.7200  144.0400       7.8        67       202        87
IR     2025250     20200   14.7000  143.2300       5.0        38       282        82
IR     2025250     20200   14.7000  143.2100       4.9        39       279        82
IR     2025250     20200   14.6400  141.1500       4.3       196       244        79
IR     2025250     20200   14.6400  141.1400       4.5       200       243        82
IR     2025250     20200   14.6900  140.9700       4.2       207       239        75
IR     2025250     20200   14.6100  144.5500       4.9        56       200        79
IR     2025250     20200   14.5900  144.1900       6.0        68       179        90
IR     2025250     20200   14.6300  143.7000       4.7        62       221        62
IR     2025250     20200   14.6200  143.2300       4.5        36       289        82
IR     2025250     20200   14.6000  141.3200       4.3       159       247        79
IR     2025250     20200   14.5400  141.2100       4.5       172       253        80
IR     2025250     20200   14.5800  141.1500       4.6       191       248        79
IR     2025250     20200   14.5400  141.0200       4.2       205       246        67
IR     2025250     20200   14.6200  140.9300       4.6       200       243        74
IR     2025250     20200   14.5400  140.5900       5.5       204       283        76
IR     2025250     20200   14.5400  144.4700       5.4        62       206        70
IR     2025250     20200   14.5200  141.2800       4.6       161       253        82
IR     2025250     20200   14.5200  141.1900       4.4       177       257        75
IR     2025250     20200   14.4400  141.1300       4.0       196       264        67
IR     2025250     20200   14.5200  140.6400       5.3       207       283        76
IR     2025250     20200   14.5200  140.5900       5.3       206       285        77
IR     2025250     20200   14.4100  145.0200       4.4       107       486        82
IR     2025250     20200   14.4200  145.0000       4.2       101       496        82
IR     2025250     20200   14.3800  143.9200       4.2        76       210        70
IR     2025250     20200   14.3500  141.4100       4.3       157       257        73
IR     2025250     20200   14.3700  141.3000       4.4       169       267        78
IR     2025250     20200   14.4100  141.1700       4.1       187       272        80
IR     2025250     20200   14.3100  141.4300       4.5       157       260        67
IR     2025250     20200   14.3300  141.4100       4.4       158       259        70
IR     2025250     20200   14.2700  141.2800       4.7       180       272        77
IR     2025250     20200   14.1500  144.5300       4.5       355       902        71
IR     2025250     20200   14.1100  144.0400       5.4        55       220        83
IR     2025250     20200   14.1500  144.0200       4.6        62       217        76
IR     2025250     20200   14.1200  141.3100       4.2       188       278        70
IR     2025250     20200   14.1000  141.2900       4.1       192       280        76
IR     2025250     20200   14.0600  140.6200       4.4       217       342        76
IR     2025250     20200   14.0600  144.0000       5.0        58       222        79
IR     2025250     20200   14.0400  143.9800       4.5        61       224        77
IR     2025250     20200   14.0400  140.6900       4.2       214       320        81
IR     2025250     20200   14.0400  140.6500       4.4       217       335        82
IR     2025250     20200   13.9000  146.5600       4.6        36       800        89
IR     2025250     20200   13.9000  148.3900       4.3        58       914        91
IR     2025250     20200   13.9000  148.3700       4.0        59       913        93
IR     2025250     20200   13.8700  147.1300       4.6        45       952        78
IR     2025250     20200   13.8100  146.4400       4.3        31       801        76
IR     2025250     20200   13.6300  148.0900       4.2        23       975        71
IR     2025250     20200   13.5700  148.1800       4.1        16       971        81
IR     2025250     20200   13.5700  148.1400       4.4        19       970        96
IR     2025250     20200   13.5300  148.0500       4.2        21       940        90
IR     2025250     20200   13.4900  144.6000       8.7       134       229        60
IR     2025250     20200   13.3200  144.8400       4.4       105       234        74
IR     2025250     20200   13.3800  144.6700       8.2       123       229        80
IR     2025250     20200   13.3800  144.6400       7.6       123       229        81
IR     2025250     20200   13.2800  144.8000       4.3        95       234        66
IR     2025250     20200   12.9700  146.6100       4.1        37       805        79
IR     2025250     20200   12.9600  145.1300       4.1        77       575        83
IR     2025250     20200   12.9400  145.1100       4.2        73       572        80
IR     2025250     20200   12.9200  146.8300       4.2        14       856        80
IR     2025250     20200   12.9200  146.7600       4.2        25       827        64
IR     2025250     20200   12.9200  146.6000       4.0        34       805        79
IR     2025250     20200   12.8500  147.4700       4.0        54       841        87
IR     2025250     20200   12.8400  146.8500       4.1         6       872        79
IR     2025250     20200   12.8400  146.7100       4.0        21       830        73
IR     2025250     20200   12.6800  147.9400       4.5        22       962        66
IR     2025250     20200   12.7500  147.5700       4.5        48       882        92
IR     2025250     20200   12.7500  147.5300       4.7        48       875        93
IR     2025250     20200   12.6600  140.8700       4.2       133       237        75
IR     2025250     20200   12.6400  140.8100       4.5       145       258        86
IR     2025250     20200   12.6600  147.9400       4.3        22       962        70
IR     2025250     20200   12.5500  141.6700      10.7        37       238        79
IR     2025250     20200   12.5500  141.5200       9.4        37       213        85
IR     2025250     20200   12.5700  141.5000       8.6        38       215        85
IR     2025250     20200   12.5700  141.3900       5.8        39       215        77
IR     2025250     20200   12.6300  141.3200       4.0        37       236        63
IR     2025250     20200   12.5900  140.8700       4.8       136       254        89
IR     2025250     20200   12.6100  140.8500       4.7       139       257        89
IR     2025250     20200   12.6200  140.7600       4.5       157       292        78
WVCT   2025250     20200   19.4500  142.2700       8.8       129       283        70
WVCT   2025250     20200   19.5300  142.2200       6.5       139       334        78
WVCT   2025250     20200   19.4700  142.0600       7.1       129       268        88
WVCT   2025250     20200   19.3900  142.3700       9.9       129       294        83
WVCT   2025250     20200   19.4100  142.3100       9.9       129       276        84
WVCT   2025250     20200   19.3900  142.1900      11.4       125       260        75
WVCT   2025250     20200   19.4100  142.1600      10.5       129       258        78
WVCT   2025250     20200   19.3500  142.0000       8.3       119       255        96
WVCT   2025250     20200   19.4100  141.9200       4.3       114       269        68
WVCT   2025250     20200   19.2500  142.5400       8.1       121       245        84
WVCT   2025250     20200   19.2500  142.4800       7.8       119       270        87
WVCT   2025250     20200   19.2900  142.4000       9.0       127       289        86
WVCT   2025250     20200   19.2500  142.3200      10.1       124       269        88
WVCT   2025250     20200   19.2900  142.2100      13.1       121       262        82
WVCT   2025250     20200   19.3300  142.0900      11.6       122       262        77
WVCT   2025250     20200   19.3300  142.0400       9.5       121       260        88
WVCT   2025250     20200   19.2700  141.8800       7.9       123       272        94
WVCT   2025250     20200   19.2500  141.8400       8.1       128       276        88
WVCT   2025250     20200   19.2300  142.6900      10.3       118       280        86
WVCT   2025250     20200   19.1900  142.6100       8.7       123       248        81
WVCT   2025250     20200   19.2300  142.5000       7.3       118       254        87
WVCT   2025250     20200   19.2300  142.4800       7.4       118       265        88
WVCT   2025250     20200   19.1700  142.3000      10.6       119       281        76
WVCT   2025250     20200   19.2100  142.2500      11.6       119       277        84
WVCT   2025250     20200   19.2100  142.1300      11.5       121       276        89
WVCT   2025250     20200   19.2100  142.0700      10.3       121       275        89
WVCT   2025250     20200   19.2300  141.9200       9.7       123       273        94
WVCT   2025250     20200   19.2300  141.8400       8.6       129       281        89
WVCT   2025250     20200   19.0700  142.7600      11.3       111       283        75
WVCT   2025250     20200   19.0900  142.6500      10.8       117       303        85
WVCT   2025250     20200   19.0700  142.5300      10.8       121       260        79
WVCT   2025250     20200   19.0500  142.4300      11.9       119       281        63
WVCT   2025250     20200   19.1300  142.1800       9.4       115       328        67
WVCT   2025250     20200   19.1300  141.9500      11.7       123       282        69
WVCT   2025250     20200   19.0500  141.8300      11.6       121       340        74
WVCT   2025250     20200   19.0500  141.7700       9.3       132       341        70
WVCT   2025250     20200   18.9900  142.8200      10.3       118       254        86
WVCT   2025250     20200   18.9900  142.6800      11.3       116       276        86
WVCT   2025250     20200   18.9900  142.5500      12.4       123       271        67
WVCT   2025250     20200   18.9500  141.9600      11.5       117       313        84
WVCT   2025250     20200   18.9700  141.9500      12.2       116       321        82
WVCT   2025250     20200   18.9900  141.8500      11.2       120       298        83
WVCT   2025250     20200   19.0300  141.7500       8.5       140       334        63
WVCT   2025250     20200   18.8500  142.5400      13.3       124       264        61
WVCT   2025250     20200   18.8500  142.4400      12.5       124       268        73
WVCT   2025250     20200   18.8500  142.3100      11.7       133       255        79
WVCT   2025250     20200   18.8500  142.2900      11.6       133       247        79
WVCT   2025250     20200   18.9300  142.2000      10.7       129       320        61
WVCT   2025250     20200   18.9300  142.0200       9.4       125       322        72
WVCT   2025250     20200   18.9300  142.0000       9.9       121       319        93
WVCT   2025250     20200   18.8700  141.8300       9.6       140       274        73
WVCT   2025250     20200   18.9300  141.7700       8.7       146       300        62
WVCT   2025250     20200   18.7900  142.4800      12.2       126       216        78
WVCT   2025250     20200   18.8300  142.3300      11.1       133       247        79
WVCT   2025250     20200   18.8300  142.2900      11.0       134       227        81
WVCT   2025250     20200   18.8300  142.1500       8.6       142       243        77
WVCT   2025250     20200   18.7700  142.1100       7.2       145       248        89
WVCT   2025250     20200   18.7700  142.0200       6.9       143       300        85
WVCT   2025250     20200   18.7900  141.9200       8.2       140       287        88
WVCT   2025250     20200   18.7500  141.8000      11.0       145       304        82
WVCT   2025250     20200   18.7500  141.6500      11.6       141       318        69
WVCT   2025250     20200   18.7700  141.6300      11.5       142       323        61
WVCT   2025250     20200   18.7500  141.5100      10.6       139       323        75
WVCT   2025250     20200   18.8300  140.7600       8.0       107       348        66
WVCT   2025250     20200   18.7000  142.8300       6.9       139       216        72
WVCT   2025250     20200   18.6800  142.6500       9.9       135       223        85
WVCT   2025250     20200   18.7000  142.4600       9.8       132       206        76
WVCT   2025250     20200   18.7400  142.4400       9.8       133       208        74
WVCT   2025250     20200   18.7100  142.3400       7.0       134       221        64
WVCT   2025250     20200   18.6600  142.2400       4.7       129       235        78
WVCT   2025250     20200   18.6500  142.0700       8.0       141       263        88
WVCT   2025250     20200   18.6900  142.0500       8.1       145       275        86
WVCT   2025250     20200   18.6700  141.9200      10.8       145       279        86
WVCT   2025250     20200   18.7300  141.8000      11.5       144       292        84
WVCT   2025250     20200   18.6500  141.6800      13.4       139       302        89
WVCT   2025250     20200   18.7100  141.6500      11.9       140       309        89
WVCT   2025250     20200   18.7100  141.5700      11.4       141       313        89
WVCT   2025250     20200   18.6500  141.4500      10.5       139       316        90
WVCT   2025250     20200   18.6900  141.3400      10.2       127       331        89
WVCT   2025250     20200   18.6500  141.2000      11.8       114       334        72
WVCT   2025250     20200   18.6500  141.1800      11.5       115       339        70
WVCT   2025250     20200   18.5600  143.4800      12.9       123       263        73
WVCT   2025250     20200   18.6400  143.3700      10.1       136       273        60
WVCT   2025250     20200   18.5600  143.1300      11.8       123       267        67
WVCT   2025250     20200   18.6000  142.7800       7.1       122       209        82
WVCT   2025250     20200   18.6400  142.6500       8.7       131       226        79
WVCT   2025250     20200   18.6200  142.6300       9.0       128       224        74
WVCT   2025250     20200   18.6200  142.4700       8.9       132       215        85
WVCT   2025250     20200   18.5600  142.3900       6.4       130       242        68
WVCT   2025250     20200   18.6400  142.2800       4.6       125       243        64
WVCT   2025250     20200   18.6400  142.2400       4.5       127       241        67
WVCT   2025250     20200   18.6100  142.0900       7.9       135       253        83
WVCT   2025250     20200   18.6100  141.9900      10.6       147       275        86
WVCT   2025250     20200   18.6300  141.9100      11.8       147       275        86
WVCT   2025250     20200   18.6100  141.8000      14.8       140       271        85
WVCT   2025250     20200   18.6300  141.7000      14.0       138       294        88
WVCT   2025250     20200   18.5500  141.5800      11.1       128       305        93
WVCT   2025250     20200   18.6100  141.5100      10.3       136       311        91
WVCT   2025250     20200   18.6300  141.3400      11.7       118       320        96
WVCT   2025250     20200   18.6300  141.1800      11.9       111       337        72
WVCT   2025250     20200   18.5400  143.5900      12.5       128       335        83
WVCT   2025250     20200   18.5400  143.5000      12.9       122       262        75
WVCT   2025250     20200   18.4800  143.4700      10.9       125       243        67
WVCT   2025250     20200   18.4600  143.2200      11.4       126       248        61
WVCT   2025250     20200   18.5400  143.1100      12.2       122       247        74
WVCT   2025250     20200   18.4800  142.7600       7.9       116       227        88
WVCT   2025250     20200   18.4600  142.6800       7.5       118       257        76
WVCT   2025250     20200   18.5200  142.4500       6.3       132       241        61
WVCT   2025250     20200   18.5400  142.3700       6.3       130       248        63
WVCT   2025250     20200   18.5200  142.2600       6.0       132       259        63
WVCT   2025250     20200   18.5400  142.2000       6.2       130       253        72
WVCT   2025250     20200   18.4800  142.0400      13.3       135       276        88
WVCT   2025250     20200   18.5000  142.0300      13.0       133       276        88
WVCT   2025250     20200   18.4800  141.8900      16.4       139       300        84
WVCT   2025250     20200   18.5300  141.8300      16.2       137       281        85
WVCT   2025250     20200   18.5100  141.7400      15.8       129       296        88
WVCT   2025250     20200   18.5300  141.6000      11.7       126       303        93
WVCT   2025250     20200   18.4500  141.2000      14.4       104       301        79
WVCT   2025250     20200   18.4900  141.1400      13.1       102       315        60
WVCT   2025250     20200   18.4500  141.0000      11.5       119       322        95
WVCT   2025250     20200   18.4500  140.9800      11.2       118       325        96
WVCT   2025250     20200   18.5300  140.6200      13.5       131       349        98
WVCT   2025250     20200   18.4100  143.6500      10.2       139       309        61
WVCT   2025250     20200   18.3700  143.3700      10.2       128       236        62
WVCT   2025250     20200   18.4400  143.1200      11.6       122       214        77
WVCT   2025250     20200   18.3800  143.0100       8.8       121       211        82
WVCT   2025250     20200   18.3600  142.8700      12.3       135       219        83
WVCT   2025250     20200   18.3800  142.7900      10.0       129       227        73
WVCT   2025250     20200   18.4400  142.7000       7.8       117       250        80
WVCT   2025250     20200   18.3800  142.6000       8.3       125       255        94
WVCT   2025250     20200   18.4200  142.5100       5.9       134       250        65
WVCT   2025250     20200   18.3600  142.4500       6.7       139       255        86
WVCT   2025250     20200   18.4400  142.2900       6.5       130       260        81
WVCT   2025250     20200   18.4400  142.2700       6.7       131       261        85
WVCT   2025250     20200   18.4400  142.1400      11.2       135       260        89
WVCT   2025250     20200   18.4200  142.0600      14.8       141       282        83
WVCT   2025250     20200   18.4400  141.9300      16.5       142       304        85
WVCT   2025250     20200   18.4000  141.8300      16.6       145       298        83
WVCT   2025250     20200   18.3600  141.7900      17.0       149       285        81
WVCT   2025250     20200   18.3800  141.6700      16.1       146       285        69
WVCT   2025250     20200   18.3800  141.6000      15.5       140       285        85
WVCT   2025250     20200   18.4300  141.2100      14.3       103       295        79
WVCT   2025250     20200   18.3500  141.1200      15.3       122       291        87
WVCT   2025250     20200   18.3900  140.6400      15.2       114       312        89
WVCT   2025250     20200   18.2700  143.8100      12.7       134       333        70
WVCT   2025250     20200   18.3200  143.0600       8.7       105       212        82
WVCT   2025250     20200   18.2700  142.9400       8.6       113       219        85
WVCT   2025250     20200   18.3400  142.8700      12.2       134       219        83
WVCT   2025250     20200   18.3000  142.8300      12.1       135       222        80
WVCT   2025250     20200   18.2600  142.7300      11.1       126       241        88
WVCT   2025250     20200   18.3000  142.6400       8.5       117       250        93
WVCT   2025250     20200   18.3400  142.5400       7.2       122       250        95
WVCT   2025250     20200   18.3400  142.4400       7.0       138       255        90
WVCT   2025250     20200   18.2600  142.3100      10.0       124       249        86
WVCT   2025250     20200   18.3400  142.1700      10.6       134       262        90
WVCT   2025250     20200   18.2800  142.0800      15.6       145       270        84
WVCT   2025250     20200   18.2600  142.0200      15.0       135       280        63
WVCT   2025250     20200   18.3200  141.9000      16.7       149       294        83
WVCT   2025250     20200   18.3200  141.8100      16.9       152       282        81
WVCT   2025250     20200   18.3000  141.7700      16.4       151       276        82
WVCT   2025250     20200   18.3000  141.6500      17.0       152       277        80
WVCT   2025250     20200   18.2600  141.5000      15.0       147       279        83
WVCT   2025250     20200   18.2500  140.6500      13.0       127       308        70
WVCT   2025250     20200   18.2300  143.8500      12.7       138       323        73
WVCT   2025250     20200   18.2300  143.7700      11.1       124       276        71
WVCT   2025250     20200   18.1700  143.6500      11.4       114       226        79
WVCT   2025250     20200   18.2300  143.5800      11.2       112       224        64
WVCT   2025250     20200   18.2300  143.5400      10.9       111       223        63
WVCT   2025250     20200   18.1700  143.4000      12.8       134       219        73
WVCT   2025250     20200   18.2500  143.1700      13.3       121       207        82
WVCT   2025250     20200   18.2100  143.1000      11.2       111       215        86
WVCT   2025250     20200   18.1900  143.0600      10.5       105       218        86
WVCT   2025250     20200   18.2500  142.9000      10.0       119       222        86
WVCT   2025250     20200   18.2400  142.8700      11.2       125       222        85
WVCT   2025250     20200   18.2100  142.7700      13.1       128       236        84
WVCT   2025250     20200   18.1800  142.6500      12.8       124       240        91
WVCT   2025250     20200   18.2000  142.5000       9.6       121       239        84
WVCT   2025250     20200   18.2200  142.4400      10.2       129       242        85
WVCT   2025250     20200   18.1600  142.3400      11.6       118       235        94
WVCT   2025250     20200   18.1800  142.2700      12.8       117       239        95
WVCT   2025250     20200   18.2200  142.1500      13.8       128       255        96
WVCT   2025250     20200   18.2400  142.0900      15.2       140       264        91
WVCT   2025250     20200   18.1800  141.9600      15.2       124       279        80
WVCT   2025250     20200   18.2200  141.8400      14.9       143       277        82
WVCT   2025250     20200   18.2400  141.7900      14.4       149       273        78
WVCT   2025250     20200   18.2400  141.6900      13.9       149       272        85
WVCT   2025250     20200   18.2000  141.6100      11.6       149       272        82
WVCT   2025250     20200   18.1800  141.1100      13.2       132       310        93
WVCT   2025250     20200   18.2300  140.6100      12.0       136       308        68
WVCT   2025250     20200   18.0800  144.1300      14.1       138       339        77
WVCT   2025250     20200   18.0800  144.1100      14.2       138       311        79
WVCT   2025250     20200   18.0800  144.0000      13.7       132       312        74
WVCT   2025250     20200   18.1100  143.8800      11.6       130       315        66
WVCT   2025250     20200   18.1100  143.7500       9.2       108       251        73
WVCT   2025250     20200   18.1100  143.6700       9.9       104       227        85
WVCT   2025250     20200   18.0700  143.6300      10.0        98       218        85
WVCT   2025250     20200   18.0900  143.4600      11.7       117       216        82
WVCT   2025250     20200   18.1500  143.4200      12.0       130       217        77
WVCT   2025250     20200   18.1300  143.3400      12.3       128       212        63
WVCT   2025250     20200   18.0700  143.2200       9.8        97       219        85
WVCT   2025250     20200   18.1300  143.1500      10.3       102       218        81
WVCT   2025250     20200   18.0700  143.0100      11.1       115       227        85
WVCT   2025250     20200   18.1300  142.9600       9.9       112       229        88
WVCT   2025250     20200   18.0700  142.7800      14.7       120       228        81
WVCT   2025250     20200   18.1500  142.6900      14.9       126       235        92
WVCT   2025250     20200   18.0700  142.6700      15.5       122       220        85
WVCT   2025250     20200   18.0700  142.4900      10.1       113       219        72
WVCT   2025250     20200   18.0700  142.4100       9.2       110       222        75
WVCT   2025250     20200   18.1400  142.3600      11.0       118       233        90
WVCT   2025250     20200   18.1400  142.2800      12.9       114       235        94
WVCT   2025250     20200   18.0600  142.1100      14.0       104       243        89
WVCT   2025250     20200   18.0600  142.0900      13.8       105       249        90
WVCT   2025250     20200   18.0600  141.9100      15.5       110       258        96
WVCT   2025250     20200   18.0600  141.8600      15.1       108       252        95
WVCT   2025250     20200   18.0600  141.7600       8.2       117       245        78
WVCT   2025250     20200   18.1000  141.7000       5.7       141       253        85
WVCT   2025250     20200   18.0600  141.3400       9.6       120       269        87
WVCT   2025250     20200   17.9800  143.9400      11.4       122       287        60
WVCT   2025250     20200   18.0000  143.8400       9.4       106       288        68
WVCT   2025250     20200   18.0500  143.7600       8.7        97       251        78
WVCT   2025250     20200   18.0100  143.6700       9.7        81       226        83
WVCT   2025250     20200   18.0300  143.6300       9.9        92       219        82
WVCT   2025250     20200   18.0500  143.5100      11.2       106       215        81
WVCT   2025250     20200   18.0500  143.4200      12.4       112       216        70
WVCT   2025250     20200   18.0500  143.2800      10.8       106       218        71
WVCT   2025250     20200   18.0500  143.2000       9.3        95       221        91
WVCT   2025250     20200   18.0500  143.0700      10.4       104       225        90
WVCT   2025250     20200   17.9900  143.0300      12.1       118       227        77
WVCT   2025250     20200   17.9700  142.8700      13.0       124       223        80
WVCT   2025250     20200   18.0300  142.8200      13.5       121       226        83
WVCT   2025250     20200   18.0500  142.7000      15.7       121       218        80
WVCT   2025250     20200   18.0500  142.6600      15.4       121       217        81
WVCT   2025250     20200   18.0500  142.5100      10.6       113       215        79
WVCT   2025250     20200   18.0300  142.4500       9.5       106       215        74
WVCT   2025250     20200   18.0500  142.3400      10.0        99       224        82
WVCT   2025250     20200   18.0100  142.2600      12.6        98       222        81
WVCT   2025250     20200   18.0200  142.1100      14.5       104       234        94
WVCT   2025250     20200   18.0200  142.0100      15.1       105       245        94
WVCT   2025250     20200   18.0200  141.9900      15.0       106       245        94
WVCT   2025250     20200   18.0200  141.8900      16.2       109       239        92
WVCT   2025250     20200   18.0400  141.8000      12.1       110       241        82
WVCT   2025250     20200   18.0200  141.6800       4.4       133       247        70
WVCT   2025250     20200   17.9600  141.3700       5.6       123       251        61
WVCT   2025250     20200   17.9600  141.2800       8.9       116       249        61
WVCT   2025250     20200   17.9800  141.1600      12.6       112       298        67
WVCT   2025250     20200   17.9600  141.1000      12.4       111       299        77
WVCT   2025250     20200   18.0400  140.9900      14.3       117       312        91
WVCT   2025250     20200   18.0400  140.9000      14.0       122       318        96
WVCT   2025250     20200   17.9000  144.3400      14.7       147       303        82
WVCT   2025250     20200   17.9000  144.2400      13.3       139       220        80
WVCT   2025250     20200   17.9200  144.0300      12.4       128       243        71
WVCT   2025250     20200   17.9000  143.9300      12.0       118       255        63
WVCT   2025250     20200   17.8800  143.8500      11.1       105       255        84
WVCT   2025250     20200   17.9400  143.8200       9.6        99       264        84
WVCT   2025250     20200   17.9600  143.7200       9.2        76       236        81
WVCT   2025250     20200   17.9500  143.6300      10.2        74       222        72
WVCT   2025250     20200   17.9500  143.4900      10.2        88       216        63
WVCT   2025250     20200   17.9500  143.4300      11.4        98       216        71
WVCT   2025250     20200   17.8700  143.2700      13.7       113       225        82
WVCT   2025250     20200   17.8700  143.2400      13.9       117       228        84
WVCT   2025250     20200   17.9100  143.0600      13.6       118       226        78
WVCT   2025250     20200   17.8700  142.9700      15.4       123       220        83
WVCT   2025250     20200   17.9100  142.9300      14.3       126       223        84
WVCT   2025250     20200   17.8900  142.7900      11.5       104       207        85
WVCT   2025250     20200   17.8900  142.7500      11.3        98       207        87
WVCT   2025250     20200   17.8900  142.6200      10.8       106       206        91
WVCT   2025250     20200   17.8900  142.5000      10.2       107       208        79
WVCT   2025250     20200   17.9100  142.3900      12.8       103       210        82
WVCT   2025250     20200   17.9500  142.3000      13.9        98       214        74
WVCT   2025250     20200   17.8900  141.9900      19.4       106       227        82
WVCT   2025250     20200   17.8700  141.8100      13.0       124       231        91
WVCT   2025250     20200   17.8700  141.7200      14.4       117       235        83
WVCT   2025250     20200   17.8900  141.6400      12.6       104       238        71
WVCT   2025250     20200   17.9000  141.6000      10.1        99       241        65
WVCT   2025250     20200   17.8800  141.4500       6.4       107       247        81
WVCT   2025250     20200   17.9400  141.3700       5.6       122       249        66
WVCT   2025250     20200   17.8600  141.2600       7.3       118       240        81
WVCT   2025250     20200   17.8600  141.1600       8.3       129       244        95
WVCT   2025250     20200   17.9200  141.1200      10.3       116       292        72
WVCT   2025250     20200   17.9200  140.9500      13.0       113       301        93
WVCT   2025250     20200   17.9200  140.9100      14.2       116       309        92
WVCT   2025250     20200   17.8600  140.7600      14.7       120       305        98
WVCT   2025250     20200   17.8600  140.6800      14.0       114       302        92
WVCT   2025250     20200   17.7800  144.3900      14.8       153       317        79
WVCT   2025250     20200   17.8600  144.2600      13.0       140       218        74
WVCT   2025250     20200   17.8000  144.0800      12.7       136       232        70
WVCT   2025250     20200   17.8200  143.9900      14.4       130       243        65
WVCT   2025250     20200   17.7800  143.9300      13.4       120       228        81
WVCT   2025250     20200   17.8600  143.8700      12.0       111       254        82
WVCT   2025250     20200   17.8200  143.7000      10.9        58       235        71
WVCT   2025250     20200   17.8000  143.6000      11.7        60       220        84
WVCT   2025250     20200   17.7800  143.5800      11.5        63       217        83
WVCT   2025250     20200   17.8200  143.4600      10.5        81       215        84
WVCT   2025250     20200   17.8000  143.3900      11.1        79       215        84
WVCT   2025250     20200   17.8500  143.2300      14.1       115       227        84
WVCT   2025250     20200   17.8300  143.1600      14.9       117       223        84
WVCT   2025250     20200   17.8100  143.0800      15.3       115       219        82
WVCT   2025250     20200   17.8500  142.9700      15.4       121       214        81
WVCT   2025250     20200   17.7700  142.8500      14.0        93       207        77
WVCT   2025250     20200   17.8500  142.3500      17.5       103       209        84
WVCT   2025250     20200   17.7900  141.9400      16.7       103       226        70
WVCT   2025250     20200   17.7900  141.8900      12.7       108       226        72
WVCT   2025250     20200   17.7700  141.7700       7.3       121       224        88
WVCT   2025250     20200   17.8500  141.7200      14.9       115       233        85
WVCT   2025250     20200   17.8500  141.5800      13.0        97       238        84
WVCT   2025250     20200   17.7700  141.4600       9.8       112       237        86
WVCT   2025250     20200   17.8400  141.3700       6.7       118       243        84
WVCT   2025250     20200   17.8400  141.3500       6.4       118       241        86
WVCT   2025250     20200   17.7700  141.1800       6.9       137       242        81
WVCT   2025250     20200   17.8200  141.1400       7.5       140       245        95
WVCT   2025250     20200   17.7800  141.0600       6.2       162       262        80
WVCT   2025250     20200   17.8000  140.8900      13.5       127       299        91
WVCT   2025250     20200   17.7600  140.8500      12.8       131       296        87
WVCT   2025250     20200   17.7600  140.7000      14.2       120       291        83
WVCT   2025250     20200   17.7800  140.6400      14.7       119       291        85
WVCT   2025250     20200   17.7100  144.4200      10.9       154       319        72
WVCT   2025250     20200   17.7100  144.4100      11.8       154       306        78
WVCT   2025250     20200   17.7600  144.2200      10.8       135       214        83
WVCT   2025250     20200   17.7000  144.0000      14.9       137       217        69
WVCT   2025250     20200   17.7600  143.9300      13.1       119       222        83
WVCT   2025250     20200   17.7600  143.8300      11.1        92       233        80
WVCT   2025250     20200   17.7600  143.6600      13.0        49       228        83
WVCT   2025250     20200   17.7400  143.6300      12.6        54       224        86
WVCT   2025250     20200   17.7200  143.5200      11.5        72       211        92
WVCT   2025250     20200   17.7200  143.3800      11.3        72       211        93
WVCT   2025250     20200   17.6800  143.3000      10.7        81       209        93
WVCT   2025250     20200   17.7200  143.1900      13.5       105       210        75
WVCT   2025250     20200   17.7400  143.1300      14.9       114       211        83
WVCT   2025250     20200   17.6800  143.0500      15.2       109       204        60
WVCT   2025250     20200   17.7200  142.8800      14.4       100       205        60
WVCT   2025250     20200   17.7300  142.8600      14.1       100       206        86
WVCT   2025250     20200   17.7100  142.4400      14.6       102       208        89
WVCT   2025250     20200   17.7300  142.4000      15.2       103       209        90
WVCT   2025250     20200   17.6700  142.2900      19.5        96       212        67
WVCT   2025250     20200   17.6700  142.1300      17.5        99       213        89
WVCT   2025250     20200   17.6700  142.0400      12.8       105       215        97
WVCT   2025250     20200   17.6700  142.0200      12.2       106       217        95
WVCT   2025250     20200   17.7500  141.6500       9.9       106       225        83
WVCT   2025250     20200   17.7300  141.5600      10.0       107       228        85
WVCT   2025250     20200   17.7100  141.4600       9.1       119       226        89
WVCT   2025250     20200   17.7100  141.4000       8.9       120       229        72
WVCT   2025250     20200   17.6700  141.2900       8.2       123       231        78
WVCT   2025250     20200   17.7500  141.2100       7.1       126       240        62
WVCT   2025250     20200   17.7300  141.1400       7.2       142       245        85
WVCT   2025250     20200   17.7100  140.9800       6.5       159       269        75
WVCT   2025250     20200   17.6700  140.9400       7.0       155       262        78
WVCT   2025250     20200   17.7500  140.8700      11.4       136       294        83
WVCT   2025250     20200   17.6700  140.7300       9.2       153       286        83
WVCT   2025250     20200   17.7100  140.6000      13.8       135       286        81
WVCT   2025250     20200   17.6300  144.4000       5.5       136       314        71
WVCT   2025250     20200   17.6300  144.2300       8.9       148       246        79
WVCT   2025250     20200   17.5900  144.1300      12.8       154       235        69
WVCT   2025250     20200   17.6400  143.9800      13.4       137       211        66
WVCT   2025250     20200   17.5800  143.8800       9.9       102       227        80
WVCT   2025250     20200   17.6600  143.8000      10.2        91       233        79
WVCT   2025250     20200   17.6200  143.6700      11.5        66       226        83
WVCT   2025250     20200   17.6200  143.6500      11.8        66       222        83
WVCT   2025250     20200   17.6000  143.5100      11.5        66       204        89
WVCT   2025250     20200   17.6600  143.4200      10.8        73       208        93
WVCT   2025250     20200   17.6200  143.3000       9.7        88       205        86
WVCT   2025250     20200   17.6200  143.2300      11.8       121       204        76
WVCT   2025250     20200   17.6600  143.0700      15.1       110       204        60
WVCT   2025250     20200   17.6600  142.9800      14.8       100       204        62
WVCT   2025250     20200   17.6400  142.7800      14.0        94       203        62
WVCT   2025250     20200   17.5800  142.6100      10.5       110       204        65
WVCT   2025250     20200   17.5800  142.5900      10.8       109       204        72
WVCT   2025250     20200   17.5800  142.4200      16.2        98       203        73
WVCT   2025250     20200   17.5900  142.3200      18.4        97       203        69
WVCT   2025250     20200   17.6300  142.2500      18.4        98       207        84
WVCT   2025250     20200   17.6100  142.2100      15.8        99       199        94
WVCT   2025250     20200   17.6500  142.0700      12.3       106       206        96
WVCT   2025250     20200   17.6500  141.9600       6.2       116       206        84
WVCT   2025250     20200   17.6300  141.3600       6.5       130       221        80
WVCT   2025250     20200   17.6500  141.2700       8.9       125       231        85
WVCT   2025250     20200   17.5900  141.1700       9.4       132       236        88
WVCT   2025250     20200   17.5900  141.1500       9.3       132       237        85
WVCT   2025250     20200   17.5700  140.9800       7.6       148       243        87
WVCT   2025250     20200   17.6500  140.9600       6.6       156       252        74
WVCT   2025250     20200   17.6300  140.8300       7.6       167       269        87
WVCT   2025250     20200   17.5700  140.6900       8.1       175       278        84
WVCT   2025250     20200   17.5700  140.6700       8.6       173       282        81
WVCT   2025250     20200   17.5700  144.3800       4.1        66       306        82
WVCT   2025250     20200   17.4900  144.1400      12.0       142       269        71
WVCT   2025250     20200   17.4900  144.0500      10.4       117       229        71
WVCT   2025250     20200   17.5500  144.0100      11.2       125       212        65
WVCT   2025250     20200   17.5600  143.9000      10.1       104       223        84
WVCT   2025250     20200   17.5400  143.7600       9.3        84       233        87
WVCT   2025250     20200   17.5200  143.7400       9.4        76       232        95
WVCT   2025250     20200   17.5000  143.6200      11.4        63       210        82
WVCT   2025250     20200   17.5000  143.5500      11.7        64       202        77
WVCT   2025250     20200   17.4800  143.4100      11.2        56       198        88
WVCT   2025250     20200   17.4800  143.3500      11.3        51       198        74
WVCT   2025250     20200   17.5400  143.1800      10.5       104       199        74
WVCT   2025250     20200   17.5600  143.1700      11.9       118       200        82
WVCT   2025250     20200   17.5600  143.0500      13.8       105       198        64
WVCT   2025250     20200   17.4800  142.9300      13.4        83       197        72
WVCT   2025250     20200   17.4800  142.7000       8.5       104       197        88
WVCT   2025250     20200   17.5400  142.6500       9.4       109       201        66
WVCT   2025250     20200   17.5200  142.5300      10.6       108       195        90
WVCT   2025250     20200   17.5400  142.4900      11.8       105       196        91
WVCT   2025250     20200   17.5600  142.4000      16.8        97       196        70
WVCT   2025250     20200   17.5000  142.0300       4.8       121       177        83
WVCT   2025250     20200   17.5100  141.4400       4.0       170       203        80
WVCT   2025250     20200   17.5500  141.1900       9.1       136       230        86
WVCT   2025250     20200   17.5300  141.1100       9.2       134       235        82
WVCT   2025250     20200   17.4700  141.0500       8.2       137       235        85
WVCT   2025250     20200   17.5500  140.9400       7.6       151       243        89
WVCT   2025250     20200   17.4700  140.8200       6.7       164       242        89
WVCT   2025250     20200   17.5100  140.6900       7.2       179       256        72
WVCT   2025250     20200   17.5300  140.6300       9.4       166       282        72
WVCT   2025250     20200   17.3900  144.1400      11.3       130       259        83
WVCT   2025250     20200   17.4100  144.1200      11.4       124       254        83
WVCT   2025250     20200   17.4700  143.9500      11.5       107       224        82
WVCT   2025250     20200   17.4100  143.8900      11.7        82       228        84
WVCT   2025250     20200   17.4700  143.7600       8.9        69       229        91
WVCT   2025250     20200   17.4500  143.7400       9.3        60       226        97
WVCT   2025250     20200   17.4700  143.6400      11.0        54       216        87
WVCT   2025250     20200   17.3900  143.5200      12.5        46       200        85
WVCT   2025250     20200   17.4600  143.4100      11.5        54       197        88
WVCT   2025250     20200   17.4000  143.2700      12.1        54       196        85
WVCT   2025250     20200   17.4200  143.2400      11.7        59       196        93
WVCT   2025250     20200   17.4600  143.1400      10.3        91       195        67
WVCT   2025250     20200   17.3800  142.8500       9.3       102       195        83
WVCT   2025250     20200   17.4000  142.7600       7.0       107       192        66
WVCT   2025250     20200   17.4200  142.7400       7.2       107       193        74
WVCT   2025250     20200   17.4600  142.5700       9.5       107       190        92
WVCT   2025250     20200   17.4000  142.4900      11.5       104       180        97
WVCT   2025250     20200   17.4200  142.4500      12.2       104       180        98
WVCT   2025250     20200   17.4600  142.3500      15.2        98       179        86
WVCT   2025250     20200   17.3800  142.1800       9.9       100       164        66
WVCT   2025250     20200   17.3800  142.1600       8.4       103       163        61
WVCT   2025250     20200   17.4300  141.1100       6.2       159       229        89
WVCT   2025250     20200   17.3900  140.9900       5.8       160       235        79
WVCT   2025250     20200   17.3700  140.9200       5.1       170       242        69
WVCT   2025250     20200   17.4300  140.7800       6.4       168       241        89
WVCT   2025250     20200   17.3900  140.6500       7.1       171       239        60
WVCT   2025250     20200   17.2900  144.2300      12.8       152       281        80
WVCT   2025250     20200   17.3700  144.1600      11.3       135       261        82
WVCT   2025250     20200   17.2900  144.1000       7.9        98       247        67
WVCT   2025250     20200   17.3300  143.9400      11.4        71       234        80
WVCT   2025250     20200   17.3500  143.8500      11.2        75       227        85
WVCT   2025250     20200   17.3100  143.8300      10.0        79       227        90
WVCT   2025250     20200   17.3500  143.7300       7.6        75       221        94
WVCT   2025250     20200   17.3700  143.5800      10.0        57       204        93
WVCT   2025250     20200   17.2900  143.5000      12.9        43       195        82
WVCT   2025250     20200   17.3100  143.4000      12.6        61       195        87
WVCT   2025250     20200   17.2900  143.3500      12.4        62       194        89
WVCT   2025250     20200   17.2900  143.2300      11.2        68       193        87
WVCT   2025250     20200   17.3700  143.1600      11.3        71       194        75
WVCT   2025250     20200   17.2900  143.0400       9.9        91       192        93
WVCT   2025250     20200   17.2900  142.8900       8.2       108       191        60
WVCT   2025250     20200   17.3400  142.8300       8.4       116       192        61
WVCT   2025250     20200   17.2800  142.6400       7.7       109       167        63
WVCT   2025250     20200   17.3200  142.5800      10.4       101       167        71
WVCT   2025250     20200   17.3600  142.4900      12.0        99       168        90
WVCT   2025250     20200   17.2800  142.3100       9.9       101       153        75
WVCT   2025250     20200   17.3000  142.2200      12.6        93       153        81
WVCT   2025250     20200   17.3200  142.2000      11.7        93       154        76
WVCT   2025250     20200   17.3500  140.9200       5.0       175       239        66
WVCT   2025250     20200   17.3000  140.8400       6.1       168       242        79
WVCT   2025250     20200   17.3500  140.7400       6.5       161       242        88
WVCT   2025250     20200   17.3000  140.6700       5.3       161       239        67
WVCT   2025250     20200   17.2600  144.4200      11.0       144       337        68
WVCT   2025250     20200   17.2800  144.4000      11.2       146       332        64
WVCT   2025250     20200   17.2200  144.2500      13.0       154       273        76
WVCT   2025250     20200   17.2700  144.2100      12.9       151       263        80
WVCT   2025250     20200   17.1900  144.0300       8.7        80       229        84
WVCT   2025250     20200   17.1900  143.9800      10.6        73       224        84
WVCT   2025250     20200   17.1900  143.8600      10.7        75       223        78
WVCT   2025250     20200   17.2300  143.7500       6.4        96       215        76
WVCT   2025250     20200   17.1900  143.7300       5.6        84       207        74
WVCT   2025250     20200   17.1900  143.5500      12.9        34       193        82
WVCT   2025250     20200   17.1900  143.4600      16.2        29       191        83
WVCT   2025250     20200   17.2700  143.3800      13.0        58       193        85
WVCT   2025250     20200   17.2100  143.2700      10.8        64       192        99
WVCT   2025250     20200   17.2700  143.2100      10.8        67       192        92
WVCT   2025250     20200   17.2700  143.0600      10.5        84       192        94
WVCT   2025250     20200   17.2300  142.8800       7.6       112       184        62
WVCT   2025250     20200   17.1900  142.6900       8.9       122       156        83
WVCT   2025250     20200   17.2100  142.6700       8.3       119       156        80
WVCT   2025250     20200   17.2600  142.5800       9.9        94       157        62
WVCT   2025250     20200   17.1900  142.4400       7.0       101       146        84
WVCT   2025250     20200   17.1900  142.3500       5.4       115       137        75
WVCT   2025250     20200   17.2400  142.2900       6.8       102       145        83
WVCT   2025250     20200   17.2600  142.1400       8.0        93       147        72
WVCT   2025250     20200   17.2600  142.1000       6.1        97       147        65
WVCT   2025250     20200   17.2200  140.9700       5.4       196       218        75
WVCT   2025250     20200   17.2000  140.9500       5.0       192       219        76
WVCT   2025250     20200   17.2600  140.8400       6.1       170       239        81
WVCT   2025250     20200   17.1800  140.6800       4.4       152       244        73
WVCT   2025250     20200   17.1000  144.4000      10.9       146       336        63
WVCT   2025250     20200   17.1000  144.3200      12.5       152       297        75
WVCT   2025250     20200   17.1800  144.2500      13.3       152       267        71
WVCT   2025250     20200   17.1800  144.0700       7.9        89       235        84
WVCT   2025250     20200   17.1400  143.9400      12.8        73       219        80
WVCT   2025250     20200   17.1200  143.8400      10.8        71       215        76
WVCT   2025250     20200   17.1700  143.7300       5.6        73       204        78
WVCT   2025250     20200   17.1700  143.7100       5.8        67       203        82
WVCT   2025250     20200   17.1700  143.5300      15.1        29       192        84
WVCT   2025250     20200   17.1100  143.4300      16.2        29       191        81
WVCT   2025250     20200   17.1100  143.4000      15.0        30       191        78
WVCT   2025250     20200   17.0900  143.2800       8.3        70       193        97
WVCT   2025250     20200   17.0900  143.2200       6.8        57       193        85
WVCT   2025250     20200   17.1100  142.7800      10.6       134       160        82
WVCT   2025250     20200   17.1700  142.7100       9.0       125       156        80
WVCT   2025250     20200   17.1300  142.5000       4.3        89       144        61
WVCT   2025250     20200   17.1500  142.4600       5.7       104       144        81
WVCT   2025250     20200   17.0900  142.1100      12.9       106       119        79
WVCT   2025250     20200   17.1600  141.7500      10.4       109       140        72
WVCT   2025250     20200   17.0800  141.4100       4.6       182       157        84
WVCT   2025250     20200   17.1200  140.6600       4.0       147       245        62
WVCT   2025250     20200   17.0500  145.3800       9.7       121       234        67
WVCT   2025250     20200   17.0500  145.2200       5.9        84       234        64
WVCT   2025250     20200   17.0200  144.3100      11.0       151       273        63
WVCT   2025250     20200   17.0600  144.3000      12.4       151       271        73
WVCT   2025250     20200   17.0800  144.1100       8.0        88       221        80
WVCT   2025250     20200   17.0600  144.0100      11.6        79       211        78
WVCT   2025250     20200   17.0800  143.8600      12.5        67       214        68
WVCT   2025250     20200   17.0800  143.7600       9.8        31       209        82
WVCT   2025250     20200   17.0200  143.7000       9.3        17       203        72
WVCT   2025250     20200   17.0600  143.6200       9.5        31       194        78
WVCT   2025250     20200   17.0000  143.4500      13.2        48       191        85
WVCT   2025250     20200   17.0700  143.4300      15.8        31       191        78
WVCT   2025250     20200   17.0200  143.3400       8.2        68       195        90
WVCT   2025250     20200   17.0100  143.2200       4.9        86       193        85
WVCT   2025250     20200   17.0100  142.9700       5.9       141       175        76
WVCT   2025250     20200   17.0700  142.9500       6.0       133       176        67
WVCT   2025250     20200   17.0200  140.9600       6.5        46       198        60
WVCT   2025250     20200   17.0400  140.5700       4.0       182       249        72
WVCT   2025250     20200   16.9400  144.3500       7.5       132       301        75
WVCT   2025250     20200   16.9200  144.3300       6.1       121       294        66
WVCT   2025250     20200   16.9800  144.1400       6.1        85       226        87
WVCT   2025250     20200   16.9400  144.0200       8.2        74       222        87
WVCT   2025250     20200   16.9000  143.9200       6.7        71       217        88
WVCT   2025250     20200   16.9600  143.7700      10.7        19       211        63
WVCT   2025250     20200   16.9800  143.6800       8.8        17       202        63
WVCT   2025250     20200   16.9200  143.6600       8.1        18       199        64
WVCT   2025250     20200   16.9600  143.4900      12.6        55       191        94
WVCT   2025250     20200   16.9600  143.4300      12.9        55       192        92
WVCT   2025250     20200   16.9000  143.3700      11.8        56       193        84
WVCT   2025250     20200   16.9600  143.2400       4.9        96       193        72
WVCT   2025250     20200   16.9200  142.9300       8.6       149       166        77
WVCT   2025250     20200   16.9100  142.3400      11.4       101       124        65
WVCT   2025250     20200   16.9100  141.5000       7.5       188       152        67
WVCT   2025250     20200   16.8900  141.3800       9.5       176       155        66
WVCT   2025250     20200   16.9700  141.2900       6.3       170       160        83
WVCT   2025250     20200   16.8900  141.1100       4.7        53       173        83
WVCT   2025250     20200   16.9500  140.9200       8.3        45       196        60
WVCT   2025250     20200   16.9500  140.8900       6.9        49       203        62
WVCT   2025250     20200   16.8900  144.3100       4.7        85       287        62
WVCT   2025250     20200   16.8800  144.0400       6.6        67       231        71
WVCT   2025250     20200   16.8600  144.0200       6.3        67       231        75
WVCT   2025250     20200   16.8600  143.8700       5.2        47       215        74
WVCT   2025250     20200   16.8600  143.8300       5.6        31       213        63
WVCT   2025250     20200   16.8000  143.6500       7.8        14       201        63
WVCT   2025250     20200   16.8200  143.5600       8.9        43       193        61
WVCT   2025250     20200   16.8200  143.5400       9.6        47       192        66
WVCT   2025250     20200   16.8800  143.4400      13.9        54       191        90
WVCT   2025250     20200   16.8200  143.3300       9.7        63       192        89
WVCT   2025250     20200   16.8200  143.2500       4.6        78       191        89
WVCT   2025250     20200   16.7900  141.5900       9.5       177       152        66
WVCT   2025250     20200   16.8700  141.4600       7.8       191       154        66
WVCT   2025250     20200   16.8500  141.4400       8.0       190       155        64
WVCT   2025250     20200   16.7900  141.3200      10.0       167       157        69
WVCT   2025250     20200   16.7900  141.2100       7.0       137       163        79
WVCT   2025250     20200   16.8700  141.1300       4.2        58       172        79
WVCT   2025250     20200   16.7500  144.3200       6.3        66       326        68
WVCT   2025250     20200   16.7300  144.2400       6.6        50       300        80
WVCT   2025250     20200   16.7700  144.1300       7.2        49       256        68
WVCT   2025250     20200   16.7500  144.0900       7.2        52       251        70
WVCT   2025250     20200   16.7900  144.0200       6.5        58       234        73
WVCT   2025250     20200   16.7500  143.9200       5.4        60       224        78
WVCT   2025250     20200   16.7900  143.8200       5.5        35       213        63
WVCT   2025250     20200   16.7800  143.6500       7.6        16       200        62
WVCT   2025250     20200   16.7800  143.6300       7.5        19       198        68
WVCT   2025250     20200   16.7600  143.5200       9.0        48       191        85
WVCT   2025250     20200   16.7800  143.3800      12.2        57       191        75
WVCT   2025250     20200   16.7200  143.2700       4.9        86       191        67
WVCT   2025250     20200   16.7000  143.2500       4.0        98       190        60
WVCT   2025250     20200   16.7000  142.3100      11.8       129       193        79
WVCT   2025250     20200   16.7200  142.2900      11.3       121       193        84
WVCT   2025250     20200   16.7500  141.5700       9.1       174       153        70
WVCT   2025250     20200   16.7700  141.2100       7.3       141       163        78
WVCT   2025250     20200   16.6900  141.1100       5.1       152       168        72
WVCT   2025250     20200   16.6500  144.4300       8.9       127       348        80
WVCT   2025250     20200   16.6300  144.3000       7.4       126       314        69
WVCT   2025250     20200   16.6900  144.2200       5.8        66       297        64
WVCT   2025250     20200   16.6700  144.1100       7.4        50       262        80
WVCT   2025250     20200   16.6900  144.0900       7.4        51       257        81
WVCT   2025250     20200   16.6500  143.9300       4.8        79       223        70
WVCT   2025250     20200   16.6700  143.7200       5.5        36       209        84
WVCT   2025250     20200   16.6900  143.6300       7.1        43       201        73
WVCT   2025250     20200   16.6900  143.6100       7.0        45       199        73
WVCT   2025250     20200   16.6300  143.5100       9.7        68       197        81
WVCT   2025250     20200   16.6100  142.9000      13.6         7       155        75
WVCT   2025250     20200   16.6800  142.6000       8.1        25       117        61
WVCT   2025250     20200   16.6200  142.3600       6.5       120       175        62
WVCT   2025250     20200   16.6800  142.1000       4.1        51       197        76
WVCT   2025250     20200   16.6200  141.6200      13.4       168       126        68
WVCT   2025250     20200   16.6800  141.3000       8.0       182       160        66
WVCT   2025250     20200   16.5200  144.7500       5.1       110       346        76
WVCT   2025250     20200   16.5200  144.2900      11.0       149       290        81
WVCT   2025250     20200   16.5900  144.2600       7.7       131       299        75
WVCT   2025250     20200   16.5900  144.1000       6.4        64       274        82
WVCT   2025250     20200   16.5300  144.0400       5.8        88       253        85
WVCT   2025250     20200   16.5500  143.7200       4.4        66       213        63
WVCT   2025250     20200   16.5100  143.6200       7.0        47       208        69
WVCT   2025250     20200   16.5700  143.5700       9.2        61       202        72
WVCT   2025250     20200   16.5900  143.4700      11.9        74       202        85
WVCT   2025250     20200   16.5100  143.3700      12.0        76       208        80
WVCT   2025250     20200   16.5900  143.3000       6.9        88       199        60
WVCT   2025250     20200   16.5700  142.9000      13.2         2       156        80
WVCT   2025250     20200   16.5000  142.0600      10.4       148       179        87
WVCT   2025250     20200   16.5600  141.5600      10.9       170       142        69
WVCT   2025250     20200   16.5200  141.2600      11.3       188       166        80
WVCT   2025250     20200   16.5000  141.1600      12.4       176       164        65
WVCT   2025250     20200   16.5800  141.0500       8.4       163       169        61
WVCT   2025250     20200   16.5600  141.0300       7.1       165       170        61
WVCT   2025250     20200   16.5000  140.7800       8.1       137       201        83
WVCT   2025250     20200   16.5000  144.7300       5.1       108       343        84
WVCT   2025250     20200   16.4800  144.7100       5.0       102       341        84
WVCT   2025250     20200   16.4600  144.3100      10.7       148       297        65
WVCT   2025250     20200   16.4200  144.2700       8.9       136       284        68
WVCT   2025250     20200   16.5000  144.1200       5.0        89       286        68
WVCT   2025250     20200   16.5000  144.0600       5.2        90       269        70
WVCT   2025250     20200   16.4400  143.9600       5.4        95       245        73
WVCT   2025250     20200   16.4900  143.6600       5.5        46       214        67
WVCT   2025250     20200   16.4300  143.5400       8.1        62       208        64
WVCT   2025250     20200   16.4500  143.5200       9.6        67       207        82
WVCT   2025250     20200   16.4900  143.2800       7.2        69       202        73
WVCT   2025250     20200   16.4900  143.2200       4.3        66       191        65
WVCT   2025250     20200   16.4500  142.8700      12.7       358       156        75
WVCT   2025250     20200   16.4100  142.8500      12.1       359       155        67
WVCT   2025250     20200   16.4700  142.1100       9.7       141       187        77
WVCT   2025250     20200   16.4700  142.0900      10.5       143       180        85
WVCT   2025250     20200   16.4600  141.4500      10.1       173       158        84
WVCT   2025250     20200   16.4400  141.4300      11.6       176       159        87
WVCT   2025250     20200   16.4800  141.2600      11.4       188       167        70
WVCT   2025250     20200   16.4600  141.2400      12.0       186       167        80
WVCT   2025250     20200   16.4600  141.0800      10.0       171       165        89
WVCT   2025250     20200   16.4600  140.9700       6.4       168       173        67
WVCT   2025250     20200   16.4400  140.9500       6.2       167       175        71
WVCT   2025250     20200   16.4400  140.8600       4.7       150       194        78
WVCT   2025250     20200   16.4000  140.7600       8.3       152       202        88
WVCT   2025250     20200   16.4200  140.6700       8.8       156       212        94
WVCT   2025250     20200   16.4000  144.6700       5.0        77       326        62
WVCT   2025250     20200   16.3400  144.5500       6.0        65       341        88
WVCT   2025250     20200   16.3400  144.2600       7.3       106       284        66
WVCT   2025250     20200   16.3200  144.1500       7.4        56       280        81
WVCT   2025250     20200   16.4000  144.0600       4.4        95       279        70
WVCT   2025250     20200   16.3800  143.9600       5.5        79       253        80
WVCT   2025250     20200   16.3800  143.9400       5.9        77       248        75
WVCT   2025250     20200   16.3600  143.5200       6.7        54       212        60
WVCT   2025250     20200   16.3800  143.4600       9.2        66       210        67
WVCT   2025250     20200   16.3200  143.3600       8.1        14       212        77
WVCT   2025250     20200   16.3900  143.2100       4.9        29       191        67
WVCT   2025250     20200   16.3500  141.4000      13.4       180       163        62
WVCT   2025250     20200   16.3800  141.3500      10.5       185       168        79
WVCT   2025250     20200   16.3800  141.2300      10.8       188       169        70
WVCT   2025250     20200   16.3800  141.1800      11.3       188       166        72
WVCT   2025250     20200   16.3500  141.0400      10.9       178       167        90
WVCT   2025250     20200   16.3600  140.9300       8.4       168       177        87
WVCT   2025250     20200   16.3100  140.8300      11.0       161       194        85
WVCT   2025250     20200   16.3600  140.7400      10.0       150       205        96
WVCT   2025250     20200   16.3100  140.7000      10.2       150       214        93
WVCT   2025250     20200   16.3000  140.6100       6.7       148       218        79
WVCT   2025250     20200   16.2300  144.7600       4.4        97       266        64
WVCT   2025250     20200   16.2500  144.5700       5.1        78       326        60
WVCT   2025250     20200   16.2500  144.3900       6.7       105       324        60
WVCT   2025250     20200   16.2300  144.3400       6.9        91       303        63
WVCT   2025250     20200   16.3000  144.2800       7.8        85       286        69
WVCT   2025250     20200   16.3000  144.1300       7.7        53       281        76
WVCT   2025250     20200   16.2600  144.0700       6.9        63       286        82
WVCT   2025250     20200   16.2800  143.9200       5.2        63       268        81
WVCT   2025250     20200   16.3000  143.9000       5.4        64       254        79
WVCT   2025250     20200   16.2200  143.3600      10.0       337       210        82
WVCT   2025250     20200   16.2200  143.2500       6.6       346       190        73
WVCT   2025250     20200   16.2500  141.3300      11.2       173       169        65
WVCT   2025250     20200   16.2500  141.2100      13.3       190       169        63
WVCT   2025250     20200   16.2900  141.1400      13.2       190       167        66
WVCT   2025250     20200   16.2700  140.9300      11.6       166       183        68
WVCT   2025250     20200   16.2900  140.8300      11.6       160       194        89
WVCT   2025250     20200   16.2700  140.6800       8.0       144       215        85
WVCT   2025250     20200   16.2100  140.6600       6.5       138       218        77
WVCT   2025250     20200   16.2100  145.0800       4.5       118       235        83
WVCT   2025250     20200   16.1300  145.0400       5.4       126       227        83
WVCT   2025250     20200   16.2100  144.7800       4.8       103       261        70
WVCT   2025250     20200   16.1500  144.4900       5.5       103       330        70
WVCT   2025250     20200   16.1300  144.2000       7.9        69       294        82
WVCT   2025250     20200   16.1700  144.1800       8.6        65       292        81
WVCT   2025250     20200   16.2000  143.9700       5.7        68       284        64
WVCT   2025250     20200   16.1300  143.8200       4.6        65       269        70
WVCT   2025250     20200   16.1300  143.8000       4.6        63       266        70
WVCT   2025250     20200   16.1400  143.6600       5.4        49       253        79
WVCT   2025250     20200   16.1600  143.5700       6.3        38       235        75
WVCT   2025250     20200   16.1400  143.4900       6.3        20       225        78
WVCT   2025250     20200   16.1600  143.3600       8.9       339       207        85
WVCT   2025250     20200   16.2000  143.2600       7.6       341       191        75
WVCT   2025250     20200   16.2000  143.2100       5.1       359       181        73
WVCT   2025250     20200   16.1400  142.2500      10.2       282       120        69
WVCT   2025250     20200   16.1800  142.1200       7.1       277       115        67
WVCT   2025250     20200   16.1900  141.3600      11.6       167       168        68
WVCT   2025250     20200   16.1900  141.3200      12.3       169       169        81
WVCT   2025250     20200   16.1900  141.2100      13.9       186       170        61
WVCT   2025250     20200   16.1900  140.8100      10.3       149       196        67
WVCT   2025250     20200   16.1900  140.6800       6.7       138       217        80
WVCT   2025250     20200   16.1300  140.6600       6.6       140       219        86
WVCT   2025250     20200   16.0400  145.0200       5.3       139       223        69
WVCT   2025250     20200   16.1100  144.9400       5.4        93       223        61
WVCT   2025250     20200   16.0700  144.6500       5.3        99       277        63
WVCT   2025250     20200   16.0700  144.5000       5.8        86       324        83
WVCT   2025250     20200   16.0500  144.4200       5.8        95       328        61
WVCT   2025250     20200   16.0300  144.2300       6.4        74       309        68
WVCT   2025250     20200   16.0300  144.1600       6.4        76       304        68
WVCT   2025250     20200   16.0900  143.8100       5.2        59       279        60
WVCT   2025250     20200   16.1100  143.8000       4.7        62       272        65
WVCT   2025250     20200   16.0900  143.6600       5.1        54       259        73
WVCT   2025250     20200   16.0900  143.5700       7.0        42       243        74
WVCT   2025250     20200   16.1000  143.4500       6.9        19       223        66
WVCT   2025250     20200   16.1000  143.3200       6.0       342       192        73
WVCT   2025250     20200   16.0500  143.1100       5.1       102       179        62
WVCT   2025250     20200   16.0600  141.3200       7.2       185       171        60
WVCT   2025250     20200   16.0200  145.0000       5.1       134       222        63
WVCT   2025250     20200   15.9600  144.9700       5.5       132       222        75
WVCT   2025250     20200   16.0200  144.8100       6.2       113       225        73
WVCT   2025250     20200   15.9600  144.7600       5.6       106       223        65
WVCT   2025250     20200   15.9400  144.6900       5.3        98       223        67
WVCT   2025250     20200   15.9700  144.1000       5.4        61       297        67
WVCT   2025250     20200   15.9700  144.0800       5.3        62       295        63
WVCT   2025250     20200   15.9300  143.9000      10.3        34       291        77
WVCT   2025250     20200   15.9300  143.8600      10.4        34       290        67
WVCT   2025250     20200   15.9300  142.9300       4.5        14       180        69
WVCT   2025250     20200   16.0100  142.8200       5.5         9       171        78
WVCT   2025250     20200   15.9500  142.7400       4.6        12       161        62
WVCT   2025250     20200   15.9200  144.9500       5.6       118       222        83
WVCT   2025250     20200   15.8600  144.8200       5.9        86       207        77
WVCT   2025250     20200   15.8800  144.7800       6.3       100       218        81
WVCT   2025250     20200   15.8800  144.7000       6.2       106       218        73
WVCT   2025250     20200   15.9000  144.2800       6.0        80       329        61
WVCT   2025250     20200   15.9200  144.2300       6.1        72       324        71
WVCT   2025250     20200   15.9200  144.0700       4.7        45       285        85
WVCT   2025250     20200   15.9000  144.0300       4.0        38       276        78
WVCT   2025250     20200   15.9100  143.8800      10.1        32       284        71
WVCT   2025250     20200   15.9100  143.8400       9.9        32       284        62
WVCT   2025250     20200   15.8400  143.5900       5.1        43       293        60
WVCT   2025250     20200   15.8900  143.5400       7.4        36       261        60
WVCT   2025250     20200   15.8700  143.4200       5.8        36       226        66
WVCT   2025250     20200   15.8700  142.5900       6.6        30       158        67
WVCT   2025250     20200   15.8900  142.5300       5.5        26       155        74
WVCT   2025250     20200   15.8500  142.2400       6.6       256       146        62
WVCT   2025250     20200   15.8400  141.3900       5.9       189       178        68
WVCT   2025250     20200   15.8400  141.1600      11.1       165       184        60
WVCT   2025250     20200   15.8400  141.0300       6.5       161       194        60
WVCT   2025250     20200   15.8400  140.5800       6.8       181       222        68
WVCT   2025250     20200   15.8200  144.8200       6.1        83       197        72
WVCT   2025250     20200   15.7500  144.7900       6.6       103       187        69
WVCT   2025250     20200   15.7700  144.6800       7.3       100       218        78
WVCT   2025250     20200   15.7400  144.3900       5.7        61       328        69
WVCT   2025250     20200   15.7600  144.3500       6.3        50       329        75
WVCT   2025250     20200   15.7800  144.2800       7.1        44       330        89
WVCT   2025250     20200   15.7800  143.8600       5.6        13       284        74
WVCT   2025250     20200   15.7600  143.6700       5.7        43       311        62
WVCT   2025250     20200   15.8000  143.6100       5.0        39       301        70
WVCT   2025250     20200   15.8200  143.4400       7.0        34       242        87
WVCT   2025250     20200   15.8200  143.4200       6.4        32       231        79
WVCT   2025250     20200   15.7700  142.2200      11.6       261       152        61
WVCT   2025250     20200   15.7700  141.5200       4.3       179       179        67
WVCT   2025250     20200   15.7700  141.3500       6.1       196       181        64
WVCT   2025250     20200   15.7800  140.7800       4.7       162       207        74
WVCT   2025250     20200   15.7800  140.7600       5.1       157       211        73
WVCT   2025250     20200   15.7300  140.5900       7.6       200       221        90
WVCT   2025250     20200   15.7100  144.6600       7.5        99       217        67
WVCT   2025250     20200   15.7200  144.3900       5.2        65       328        75
WVCT   2025250     20200   15.6700  144.3500       4.0        68       324        61
WVCT   2025250     20200   15.7000  144.2600       6.2        41       327        77
WVCT   2025250     20200   15.7200  143.8600       4.7        10       299        70
WVCT   2025250     20200   15.7200  143.6300       6.6        43       320        84
WVCT   2025250     20200   15.7000  143.5900       6.6        41       311        77
WVCT   2025250     20200   15.6800  143.4700       6.5        26       282        77
WVCT   2025250     20200   15.7100  142.0900       4.2       254       163        60
WVCT   2025250     20200   15.6900  141.5000       6.7       197       186        69
WVCT   2025250     20200   15.6700  140.8200       5.7       174       205        60
WVCT   2025250     20200   15.6500  140.6900       7.9       190       225        77
WVCT   2025250     20200   15.7100  140.5900       8.0       201       223        89
WVCT   2025250     20200   15.6700  140.5400       8.4       205       225        91
WVCT   2025250     20200   15.5500  144.7500       6.4        98       191        61
WVCT   2025250     20200   15.5700  144.1900       4.0        60       305        67
WVCT   2025250     20200   15.5500  144.0400       4.7        72       290        74
WVCT   2025250     20200   15.5700  143.8700       4.9        43       304        65
WVCT   2025250     20200   15.5700  143.8500       5.0        39       309        66
WVCT   2025250     20200   15.5500  143.5400       5.3        23       333        81
WVCT   2025250     20200   15.6000  142.4600       8.4       272       182        61
WVCT   2025250     20200   15.6000  142.4300       9.6       269       181        67
WVCT   2025250     20200   15.5400  142.2500      15.7       266       179        66
WVCT   2025250     20200   15.5600  142.2200      13.7       265       177        71
WVCT   2025250     20200   15.5900  140.7000       7.3       197       229        92
WVCT   2025250     20200   15.5300  140.5500       9.5       216       239        91
WVCT   2025250     20200   15.5000  144.8800       6.4        58       215        81
WVCT   2025250     20200   15.4600  144.8400       6.0        63       189        77
WVCT   2025250     20200   15.4600  144.7400       6.4        96       188        71
WVCT   2025250     20200   15.5300  144.1900       4.0        70       300        72
WVCT   2025250     20200   15.5300  143.9200       4.9        65       290        73
WVCT   2025250     20200   15.5100  143.8500       4.9        50       304        69
WVCT   2025250     20200   15.5300  143.7300       7.4        39       341        77
WVCT   2025250     20200   15.5300  143.5100       5.9        21       321        75
WVCT   2025250     20200   15.5200  142.5200       9.0       273       187        60
WVCT   2025250     20200   15.4600  142.4400      12.8       272       187        60
WVCT   2025250     20200   15.4600  142.3300      13.8       269       183        73
WVCT   2025250     20200   15.4800  140.7800       4.7       191       223        80
WVCT   2025250     20200   15.5200  140.7400       4.8       189       228        72
WVCT   2025250     20200   15.4400  140.6100       7.1       219       241        89
WVCT   2025250     20200   15.5000  140.5300       8.7       216       243        90
WVCT   2025250     20200   15.4400  144.8500       5.3        79       220        60
WVCT   2025250     20200   15.3800  144.8300       8.1       138       186        77
WVCT   2025250     20200   15.3600  144.6400      10.0       131       212        68
WVCT   2025250     20200   15.4100  143.7900       6.8        51       314        83
WVCT   2025250     20200   15.4300  143.4300       5.3        47       332        63
WVCT   2025250     20200   15.3500  142.4800       7.9       287       189        60
WVCT   2025250     20200   15.3900  142.4000      11.1       278       188        78
WVCT   2025250     20200   15.4100  142.3300      11.1       277       186        70
WVCT   2025250     20200   15.3800  141.1000       4.1       202       209        69
WVCT   2025250     20200   15.3400  140.7900       5.2       203       227        75
WVCT   2025250     20200   15.3600  140.7400       5.2       207       236        79
WVCT   2025250     20200   15.4000  140.5900       6.3       212       242        84
WVCT   2025250     20200   15.3600  140.5500       6.2       199       243        75
WVCT   2025250     20200   15.2800  144.5200       7.0       104       210        74
WVCT   2025250     20200   15.3000  144.0900       5.2        95       295        62
WVCT   2025250     20200   15.2800  143.9300       4.3        96       286        63
WVCT   2025250     20200   15.2800  143.8400       4.6        83       282        76
WVCT   2025250     20200   15.2800  143.6900       6.9        57       293        82
WVCT   2025250     20200   15.2600  143.6500       6.9        57       290        83
WVCT   2025250     20200   15.3000  143.5200       4.9        52       325        61
WVCT   2025250     20200   15.3100  142.5300       5.1       302       194        61
WVCT   2025250     20200   15.3100  142.4700       6.3       292       190        68
WVCT   2025250     20200   15.3300  142.3400       7.7       280       188        61
WVCT   2025250     20200   15.3300  142.1000       6.3       259       190        76
WVCT   2025250     20200   15.2500  141.7300       4.0       305       192        65
WVCT   2025250     20200   15.2500  141.0700       5.0       211       213        64
WVCT   2025250     20200   15.3200  140.7700       5.5       209       229        69
WVCT   2025250     20200   15.3200  140.5700       5.8       202       243        62
WVCT   2025250     20200   15.2100  144.5600       6.5       103       190        92
WVCT   2025250     20200   15.2100  144.5000       6.5        89       189        97
WVCT   2025250     20200   15.2100  144.4400       6.6        83       190        68
WVCT   2025250     20200   15.2400  144.1600       4.8        91       266        71
WVCT   2025250     20200   15.1800  143.9300       5.4        98       283        77
WVCT   2025250     20200   15.2000  143.8400       4.6        99       281        75
WVCT   2025250     20200   15.2200  143.7400       4.8        80       279        81
WVCT   2025250     20200   15.2400  143.6300       6.9        58       287        82
WVCT   2025250     20200   15.1800  143.5700       6.7        56       284        81
WVCT   2025250     20200   15.1600  143.4900       6.9        54       292        79
WVCT   2025250     20200   15.1600  142.1100       6.3       243       201        70
WVCT   2025250     20200   15.1500  140.6800       6.2       232       232        61
WVCT   2025250     20200   15.1100  144.6500       6.3        86       217        83
WVCT   2025250     20200   15.0700  144.5100       6.0        89       171        93
WVCT   2025250     20200   15.0700  144.5000       6.1        89       171        94
WVCT   2025250     20200   15.1500  144.3500       5.9        73       205        96
WVCT   2025250     20200   15.1300  144.2900       5.5        70       227        81
WVCT   2025250     20200   15.1500  144.1800       5.8        87       252        80
WVCT   2025250     20200   15.0700  144.1000       7.2        83       278        65
WVCT   2025250     20200   15.0700  143.9400       6.5        70       292        83
WVCT   2025250     20200   15.0700  143.9300       6.1        71       297        82
WVCT   2025250     20200   15.0700  143.8300       4.9        83       297        82
WVCT   2025250     20200   15.0900  143.7400       4.7        78       292        82
WVCT   2025250     20200   15.1200  143.6000       6.5        62       277        82
WVCT   2025250     20200   15.1000  143.4700       8.3        57       286        74
WVCT   2025250     20200   15.1000  143.4500       8.1        59       287        74
WVCT   2025250     20200   15.0700  143.3400       6.5        65       289        61
WVCT   2025250     20200   15.0800  142.4300       4.0       264       214        60
WVCT   2025250     20200   15.1000  142.3500       5.1       262       210        62
WVCT   2025250     20200   15.1400  142.0700       5.8       264       201        77
WVCT   2025250     20200   15.0700  140.8200       6.1       218       236        71
WVCT   2025250     20200   15.0500  140.7700       7.4       223       236        88
WVCT   2025250     20200   15.0700  140.6400       6.1       228       225        71
WVCT   2025250     20200   15.1100  140.5400       5.3       211       233        69
WVCT   2025250     20200   15.1100  140.5200       5.0       209       239        64
WVCT   2025250     20200   14.9800  144.6200       5.8        88       174        78
WVCT   2025250     20200   15.0000  144.5100       5.7        94       171        87
WVCT   2025250     20200   15.0100  144.4600       6.0        89       171        81
WVCT   2025250     20200   14.9800  144.3600       7.1        61       180        94
WVCT   2025250     20200   14.9700  144.2400       7.5        60       210        93
WVCT   2025250     20200   15.0500  144.1100       7.3        80       276        67
WVCT   2025250     20200   14.9900  144.0000       9.1        56       298        79
WVCT   2025250     20200   15.0500  143.9100       6.1        68       298        74
WVCT   2025250     20200   15.0500  143.8900       5.7        71       297        75
WVCT   2025250     20200   14.9900  143.7100       6.1        72       303        81
WVCT   2025250     20200   15.0100  143.7000       6.1        73       298        81
WVCT   2025250     20200   15.0100  143.6000       6.9        65       281        72
WVCT   2025250     20200   14.9700  143.4500       9.1        59       265        67
WVCT   2025250     20200   15.0300  143.3700       8.2        61       278        67
WVCT   2025250     20200   14.9700  143.1300       5.7        63       250        61
WVCT   2025250     20200   14.9800  140.8400       4.3       223       241        61
WVCT   2025250     20200   15.0200  140.7300       6.9       226       237        73
WVCT   2025250     20200   14.9800  140.6000       4.2       221       228        74
WVCT   2025250     20200   14.9400  144.5900       5.8        98       171        88
WVCT   2025250     20200   14.8800  144.5300       5.4        95       171        77
WVCT   2025250     20200   14.9000  144.4500       5.5        86       173        85
WVCT   2025250     20200   14.9400  144.3200       7.4        57       192        92
WVCT   2025250     20200   14.9400  144.2200       7.2        64       210        92
WVCT   2025250     20200   14.9000  144.0900       8.1        61       225        67
WVCT   2025250     20200   14.9500  144.0000       9.4        55       294        72
WVCT   2025250     20200   14.9500  143.9800       9.0        55       299        74
WVCT   2025250     20200   14.9000  143.8800       7.1        64       299        75
WVCT   2025250     20200   14.8800  143.7700       6.2        71       295        76
WVCT   2025250     20200   14.8800  143.6500       5.9        78       283        72
WVCT   2025250     20200   14.9500  143.5600       7.3        66       276        74
WVCT   2025250     20200   14.9300  143.4500       8.7        60       265        68
WVCT   2025250     20200   14.9400  140.6100       4.2       221       238        81
WVCT   2025250     20200   14.8600  144.5600       5.5        94       173        78
WVCT   2025250     20200   14.8600  144.4900       5.4        86       173        86
WVCT   2025250     20200   14.8200  144.3700       5.4        66       176        78
WVCT   2025250     20200   14.8000  144.3500       5.3        67       176        78
WVCT   2025250     20200   14.8400  144.1800       6.6        61       199        83
WVCT   2025250     20200   14.8200  144.1100       6.7        58       210        79
WVCT   2025250     20200   14.8600  144.0700       7.6        58       220        65
WVCT   2025250     20200   14.8000  143.6100       4.8        82       250        66
WVCT   2025250     20200   14.8200  143.5900       5.2        79       263        72
WVCT   2025250     20200   14.8200  143.4400       6.3        70       284        82
WVCT   2025250     20200   14.8600  143.4100       7.0        63       268        83
WVCT   2025250     20200   14.7700  140.8700       4.3       216       234        75
WVCT   2025250     20200   14.6900  144.3700       6.0        68       180        97
WVCT   2025250     20200   14.6900  144.3500       5.7        67       180        96
WVCT   2025250     20200   14.7600  144.1800       6.2        66       186        90
WVCT   2025250     20200   14.7300  144.1400       6.2        65       182        79
WVCT   2025250     20200   14.6900  144.0100       4.9        66       203        82
WVCT   2025250     20200   14.7200  143.5300       4.4        85       284        73
WVCT   2025250     20200   14.7200  143.4400       4.3        96       300        79
WVCT   2025250     20200   14.7600  143.3800       5.0        80       297        80
WVCT   2025250     20200   14.7600  143.2700       5.4        65       282        65
WVCT   2025250     20200   14.7200  143.1900       5.2        68       272        62
WVCT   2025250     20200   14.7000  143.1200       4.9        68       261        73
WVCT   2025250     20200   14.7500  142.2700       4.1       266       217        64
WVCT   2025250     20200   14.6700  141.1500       4.0       211       242        67
WVCT   2025250     20200   14.7300  140.8700       4.5       213       237        89
WVCT   2025250     20200   14.6900  140.8400       4.0       209       250        84
WVCT   2025250     20200   14.6900  140.6100       5.3       210       264        85
WVCT   2025250     20200   14.6700  144.3600       6.2        69       182        92
WVCT   2025250     20200   14.6700  144.3300       5.6        67       182        85
WVCT   2025250     20200   14.5900  144.2500       5.8        71       182        65
WVCT   2025250     20200   14.5900  144.1000       6.3        74       176        78
WVCT   2025250     20200   14.6700  143.9900       4.5        69       202        83
WVCT   2025250     20200   14.5900  143.9600       4.3        87       191        77
WVCT   2025250     20200   14.6700  143.7000       7.0        66       218        63
WVCT   2025250     20200   14.6100  143.5100       4.6        92       301        80
WVCT   2025250     20200   14.6100  143.4000       4.1       120       303        62
WVCT   2025250     20200   14.6600  143.2100       5.2        71       289        76
WVCT   2025250     20200   14.6600  143.0800       4.7        64       262        83
WVCT   2025250     20200   14.6200  142.3200       4.6       281       227        62
WVCT   2025250     20200   14.5800  141.1500       4.0       190       248        65
WVCT   2025250     20200   14.6400  141.1400       4.3       205       244        63
WVCT   2025250     20200   14.5800  141.0400       4.4       213       241        82
WVCT   2025250     20200   14.5800  140.7000       5.1       203       281        66
WVCT   2025250     20200   14.6100  140.6600       6.1       206       277        70
WVCT   2025250     20200   14.5500  144.4000       6.5        86       196        74
WVCT   2025250     20200   14.5700  144.2900       5.5        67       188        87
WVCT   2025250     20200   14.5300  144.2500       5.4        70       188        73
WVCT   2025250     20200   14.5300  144.0800       6.4        77       182        80
WVCT   2025250     20200   14.5700  144.0600       6.0        77       181        71
WVCT   2025250     20200   14.5700  143.9600       4.5        88       191        80
WVCT   2025250     20200   14.5700  143.4700       4.4        95       310        78
WVCT   2025250     20200   14.5700  143.4500       4.3       100       305        72
WVCT   2025250     20200   14.5300  142.7100       4.0        81       231        75
WVCT   2025250     20200   14.5200  141.3000       4.3       158       253        75
WVCT   2025250     20200   14.5400  141.2100       4.0       167       256        66
WVCT   2025250     20200   14.5400  140.6400       5.1       206       283        73
WVCT   2025250     20200   14.5600  140.5900       4.7       204       283        74
WVCT   2025250     20200   14.4800  144.3600       5.9        79       212        60
WVCT   2025250     20200   14.4600  144.2600       5.2        71       205        74
WVCT   2025250     20200   14.4800  144.2400       5.3        72       198        82
WVCT   2025250     20200   14.4600  144.0900       6.6        75       189        98
WVCT   2025250     20200   14.4000  143.9900       5.7        69       199        93
WVCT   2025250     20200   14.4000  143.9400       5.1        77       210        88
WVCT   2025250     20200   14.4000  143.8600       4.1        85       210        67
WVCT   2025250     20200   14.4500  141.3400       4.5       153       258        76
WVCT   2025250     20200   14.3800  144.1600       5.8        69       210        93
WVCT   2025250     20200   14.3400  144.0300       5.3        66       197        68
WVCT   2025250     20200   14.3200  143.9900       4.7        71       198        71
WVCT   2025250     20200   14.3400  143.9200       4.6        84       210        89
WVCT   2025250     20200   14.2900  141.5600       4.1       156       250        79
WVCT   2025250     20200   14.2300  144.1400       4.3        70       222        63
WVCT   2025250     20200   14.2100  143.9700       4.1       103       212        64
WVCT   2025250     20200   14.2300  143.9500       4.2       110       212        80
WVCT   2025250     20200   14.2800  143.8600       4.4        97       210        90
WVCT   2025250     20200   14.2600  143.1000       4.1        76       217        78
WVCT   2025250     20200   14.2200  141.5800       4.6       148       250        67
WVCT   2025250     20200   14.2500  141.4500       4.8       154       261        68
WVCT   2025250     20200   14.2000  141.2900       4.4       197       269        72
WVCT   2025250     20200   14.1900  144.1400       4.8        65       224        67
WVCT   2025250     20200   14.1800  142.6500       4.5        55       311        64
WVCT   2025250     20200   14.1400  141.5900       4.3       159       253        71
WVCT   2025250     20200   14.0600  144.0200       7.1        56       219        67
WVCT   2025250     20200   14.0300  141.7800       4.1       185       260        89
WVCT   2025250     20200   14.0500  141.7600       4.2       182       258        89
WVCT   2025250     20200   13.9100  142.0200       6.1       166       281        88
WVCT   2025250     20200   13.9300  141.9300       5.3       177       281        76
WVCT   2025250     20200   13.9900  141.8000       4.0       189       267        91
WVCT   2025250     20200   13.9300  141.7000       4.7       185       282        81
WVCT   2025250     20200   13.8300  144.1200       5.8        90       339        78
WVCT   2025250     20200   13.8900  144.0100       6.0        70       303        82
WVCT   2025250     20200   13.9000  142.0200       6.1       166       284        87
WVCT   2025250     20200   13.9000  141.9600       6.1       178       286        88
WVCT   2025250     20200   13.8800  141.9100       5.7       180       290        84
WVCT   2025250     20200   13.7300  143.8600       5.3        80       303        81
WVCT   2025250     20200   13.6700  142.5400       4.2       150       314        85
WVCT   2025250     20200   13.5800  142.6100       4.0       155       340        72
WVCT   2025250     20200   13.5700  142.5200       5.8       157       341        66
WVCT   2025250     20200   13.3600  144.9400       6.7       111       309        78
WVCT   2025250     20200   13.3400  144.8800       8.0       116       272        76
WVCT   2025250     20200   13.1900  140.4900       4.2       120       233        69
WVCT   2025250     20200   12.9600  140.5800       4.3       130       239        71
WVCT   2025250     20200   12.9800  140.5600       4.5       133       239        67
WVCT   2025250     20200   12.9100  143.0200       4.4       128       339        75
WVCT   2025250     20200   12.8700  140.6700       4.0       118       239        79
WVCT   2025250     20200   12.9300  140.6100       4.1       124       239        61
WVCT   2025250     20200   12.8400  143.0800       5.6       139       350        63
WVCT   2025250     20200   12.8600  142.9500       4.1       139       334        79
WVCT   2025250     20200   12.8300  140.7200       4.0       118       242        71
WVCT   2025250     20200   12.8300  140.6100       5.3       126       247        69
WVCT   2025250     20200   12.7200  144.7800       9.0        32       332        79
WVCT   2025250     20200   12.7100  144.6900      10.1        33       313        73
WVCT   2025250     20200   12.7100  144.4000       6.7        66       229        84
WVCT   2025250     20200   12.6900  144.3500       7.2        62       234        78
WVCT   2025250     20200   12.7600  143.1900       5.4       133       344        74
WVCT   2025250     20200   12.7200  140.7400       5.9       133       258        85
WVCT   2025250     20200   12.7400  140.6100       5.6       124       261        71
WVCT   2025250     20200   12.7400  140.5000       5.0       137       297        75
WVCT   2025250     20200   12.7600  140.4800       5.3       138       297        77
WVCT   2025250     20200   12.6200  144.7400      14.3        18       341        77
WVCT   2025250     20200   12.6200  144.7000      12.9        23       330        79
WVCT   2025250     20200   12.6300  143.2400       4.5       137       332        70
WVCT   2025250     20200   12.6500  141.6700       7.5        40       236        77
WVCT   2025250     20200   12.6600  141.6500       6.1        42       237        65
WVCT   2025250     20200   12.5900  141.4800       8.0        46       231        70
WVCT   2025250     20200   12.5900  141.4600       7.2        45       231        73
WVCT   2025250     20200   12.6100  140.8500       5.1       130       249        84
WVCT   2025250     20200   12.6400  140.8100       5.6       134       256        91
WVCT   2025250     20200   12.6400  140.7200       6.1       132       292        77
WVCT   2025250     20200   12.6600  140.6300       4.9       128       301        81
WVCT   2025250     20200   12.5800  144.6400      10.3        37       308        79
WVCT   2025250     20200   12.5400  142.6800       6.7        77       310        65
WVCT   2025250     20200   12.5700  141.4100       6.0        46       209        92
WVCT   2025250     20200   12.5700  141.3900       5.8        47       209        96
WVCT   2025250     20200   12.5300  141.3000       5.8        57       217        83
WVCT   2025250     20200   12.5100  140.9400       5.4       119       245        89
WVCT   2025250     20200   12.5700  140.9100       4.9       124       241        88
WVCT   2025250     20200   12.5500  140.8300       4.6       117       322        60
VIS    2025250     20200   21.8100  149.7000       4.9        80       936        97
VIS    2025250     20200   21.8100  149.7000       4.9        80       935        97
VIS    2025250     20200   21.8100  149.6700       5.3        82       935        95
VIS    2025250     20200   21.8000  149.6400       5.6        79       975        90
VIS    2025250     20200   21.7600  146.4600       5.7        88       962        95
VIS    2025250     20200   21.7500  144.7700       8.5        88       994        98
VIS    2025250     20200   21.7500  144.6900       8.6        85       967        95
VIS    2025250     20200   21.7500  144.6800       8.6        83       936        97
VIS    2025250     20200   21.7500  144.6600       8.7        80       904        96
VIS    2025250     20200   21.7600  144.6200       9.2        76       899        93
VIS    2025250     20200   21.7600  144.5600       7.8        81       911        95
VIS    2025250     20200   21.7400  144.5200       7.9        83       954        98
VIS    2025250     20200   21.7500  144.5000       8.1        85       954        96
VIS    2025250     20200   21.7600  144.4900       8.1        86       942        98
VIS    2025250     20200   21.7600  144.4600       7.9        85       928        97
VIS    2025250     20200   21.7500  144.4200       8.6        86       902        96
VIS    2025250     20200   21.7600  144.4000       8.6        88       908        98
VIS    2025250     20200   21.7500  144.3800       8.6        89       900        98
VIS    2025250     20200   21.7600  144.3500       8.9        92       900        95
VIS    2025250     20200   21.7600  144.3200       9.2        92       904        96
VIS    2025250     20200   21.7500  144.3000       9.0        87       902        95
VIS    2025250     20200   21.7400  144.2700       9.0        77       901        95
VIS    2025250     20200   21.7400  144.2400       8.8        77       903        97
VIS    2025250     20200   21.7400  144.2200       8.5        78       903        97
VIS    2025250     20200   21.7400  144.2000       8.2        79       903        98
VIS    2025250     20200   21.7600  144.1700       8.3        80       903        94
VIS    2025250     20200   21.7600  144.1600       8.2        80       904        95
VIS    2025250     20200   21.7600  144.1300       7.5        80       907        91
VIS    2025250     20200   21.7600  144.0900       7.8        84       907        95
VIS    2025250     20200   21.7400  144.0700       7.8        87       910        97
VIS    2025250     20200   21.7500  144.0600       7.8        86       911        96
VIS    2025250     20200   21.7600  144.0200       8.1        82       921        99
VIS    2025250     20200   21.7500  144.0100       8.1        82       921        99
VIS    2025250     20200   21.7400  143.9700       8.7        87       921        98
VIS    2025250     20200   21.7600  143.9600       8.6        85       927        99
VIS    2025250     20200   21.7600  143.9300       8.8        86       925        98
VIS    2025250     20200   21.7400  143.9000       9.0        82       908        97
VIS    2025250     20200   21.7400  143.8800       8.9        79       908        97
VIS    2025250     20200   21.7600  143.8500      10.3        77       913        93
VIS    2025250     20200   21.7500  143.8300      10.6        82       951        95
VIS    2025250     20200   21.7400  143.7900       9.3        79       929        96
VIS    2025250     20200   21.7400  143.7900       8.9        78       929        96
VIS    2025250     20200   21.7600  143.7600       8.3        76       967        99
VIS    2025250     20200   21.7600  143.7400       8.6        80       950        99
VIS    2025250     20200   21.7500  143.6900       9.1        84       978        97
VIS    2025250     20200   21.7400  143.6800       9.7        84       953        98
VIS    2025250     20200   21.7500  143.6600      10.1        83       959        98
VIS    2025250     20200   21.7600  143.6400      10.1        82       952        98
VIS    2025250     20200   21.7600  143.6200      10.1        83       955        98
VIS    2025250     20200   21.7600  143.5800      10.5        85       984        97
VIS    2025250     20200   21.7600  143.5500      11.1        80       949        96
VIS    2025250     20200   21.7500  143.5200      10.9        80       938        98
VIS    2025250     20200   21.7400  143.5200      10.5        79       938        98
VIS    2025250     20200   21.7500  142.8300       9.6        84       977        90
VIS    2025250     20200   21.7500  142.8100       9.8        82       953        97
VIS    2025250     20200   21.7400  142.7800       9.9        80       949       100
VIS    2025250     20200   21.7500  142.7800       9.7        82       943       100
VIS    2025250     20200   21.7400  142.7500       9.5        82       951       100
VIS    2025250     20200   21.7400  142.7100      10.3        79       968       100
VIS    2025250     20200   21.7300  142.7000      10.4        79       975       100
VIS    2025250     20200   21.7400  142.6600      10.2        83       942        99
VIS    2025250     20200   21.7400  142.6500      10.0        83       925        98
VIS    2025250     20200   21.7300  142.6100       9.6        84       927        99
VIS    2025250     20200   21.7300  142.5800       9.8        85       927       100
VIS    2025250     20200   21.7300  142.5800       9.7        86       927        99
VIS    2025250     20200   21.7500  142.5300       9.8        89       920       100
VIS    2025250     20200   21.7500  142.5000      10.0        91       923        98
VIS    2025250     20200   21.7500  142.1100       9.6        83       965        99
VIS    2025250     20200   21.7500  142.0700       8.8        81       954        97
VIS    2025250     20200   21.7500  142.0600       8.6        81       954        93
VIS    2025250     20200   21.7500  142.0400       8.7        81       954        94
VIS    2025250     20200   21.7300  142.0100       8.4        83       958        94
VIS    2025250     20200   21.7300  141.9900       8.6        85       941        97
VIS    2025250     20200   21.7500  141.9600       9.0        85       937        99
VIS    2025250     20200   21.7400  141.9400       9.4        84       935        99
VIS    2025250     20200   21.7400  141.9200       9.3        84       932        99
VIS    2025250     20200   21.7300  141.8800       9.4        81       927        97
VIS    2025250     20200   21.7300  141.8600       9.4        80       927        96
VIS    2025250     20200   21.7400  141.8500       9.3        81       927        99
VIS    2025250     20200   21.7200  141.8000       9.2        88       935        96
VIS    2025250     20200   21.7400  141.7800       9.5        87       944        97
VIS    2025250     20200   21.7400  141.7700       9.6        86       944        98
VIS    2025250     20200   21.7400  141.7500       9.8        85       936        98
VIS    2025250     20200   21.7200  141.7200       9.6        83       937        97
VIS    2025250     20200   21.7400  141.6900       9.7        84       935        99
VIS    2025250     20200   21.7300  141.6700       9.6        81       931        99
VIS    2025250     20200   21.7300  141.6400       9.4        81       931        99
VIS    2025250     20200   21.7400  141.6200       9.5        81       933        99
VIS    2025250     20200   21.7300  141.5900       9.4        81       933        97
VIS    2025250     20200   21.7200  141.5700       8.9        80       936        96
VIS    2025250     20200   21.7300  141.5400       8.7        81       940        96
VIS    2025250     20200   21.7400  141.5200       9.0        84       958        96
VIS    2025250     20200   21.7200  141.5000       9.4        85       968        94
VIS    2025250     20200   21.7400  141.4600      10.3        84       968        95
VIS    2025250     20200   21.7200  141.4400      10.3        86       974        99
VIS    2025250     20200   21.7400  141.4200      10.0        83       962        99
VIS    2025250     20200   21.7300  141.3900       9.4        83       979        98
VIS    2025250     20200   21.7300  141.3800       9.3        84       975        97
VIS    2025250     20200   21.7300  141.3400       8.6        86       975        96
VIS    2025250     20200   21.7300  141.3300       8.3        89       975        95
VIS    2025250     20200   21.7300  141.2900       8.3        89       992        91
VIS    2025250     20200   21.7200  141.2700       8.7        89       988        92
VIS    2025250     20200   21.7200  141.2300       9.1        91       952        96
VIS    2025250     20200   21.7300  141.2300       9.0        91       952        97
VIS    2025250     20200   21.7400  141.2000       9.4        86       926        99
VIS    2025250     20200   21.7300  141.1600       9.4        84       926        99
VIS    2025250     20200   21.7300  141.1600       9.3        84       926        99
VIS    2025250     20200   21.7300  141.1300       9.3        83       925        99
VIS    2025250     20200   21.7300  141.0900       9.0        83       925       100
VIS    2025250     20200   21.7400  141.0800       8.7        85       924        99
VIS    2025250     20200   21.7300  141.0500       8.6        87       924        99
VIS    2025250     20200   21.7300  141.0300       8.5        89       923        97
VIS    2025250     20200   21.7200  140.9800       8.5        87       922        92
VIS    2025250     20200   21.7300  140.9500       8.5        86       924        96
VIS    2025250     20200   21.7400  140.9100       8.7        87       918        97
VIS    2025250     20200   21.7200  140.8900       8.7        87       924        98
VIS    2025250     20200   21.7300  140.8600       8.8        88       924        98
VIS    2025250     20200   21.7200  140.8500       8.6        88       924        98
VIS    2025250     20200   21.7300  140.8200       8.7        87       922        99
VIS    2025250     20200   21.7300  140.8100       8.7        87       922        99
VIS    2025250     20200   21.7200  140.7800       8.6        86       924        96
VIS    2025250     20200   21.7300  140.7400       9.0        84       924        99
VIS    2025250     20200   21.7200  140.7200       9.4        81       929        99
VIS    2025250     20200   21.7400  140.6900       9.3        80       927        96
VIS    2025250     20200   21.7400  140.6800       9.4        80       926        98
VIS    2025250     20200   21.7400  140.6600       9.2        80       922       100
VIS    2025250     20200   21.7300  140.6300       8.6        84       919        99
VIS    2025250     20200   21.7200  140.6000       8.4        86       922        98
VIS    2025250     20200   21.7300  140.5800       8.3        86       921        97
VIS    2025250     20200   21.7200  140.5500       8.5        84       921        97
VIS    2025250     20200   21.7300  140.5200       8.6        85       921        97
VIS    2025250     20200   21.7200  140.5000       8.6        85       923        98
VIS    2025250     20200   21.7400  140.4900       8.5        84       919        97
VIS    2025250     20200   21.7300  140.4600       8.9        85       923       100
VIS    2025250     20200   21.7200  140.4200       8.7        84       931        96
VIS    2025250     20200   21.7800  149.7200       5.5        88       936        93
VIS    2025250     20200   21.8000  149.7200       5.2        88       936        94
VIS    2025250     20200   21.8000  149.6900       5.0        82       936        94
VIS    2025250     20200   21.7900  149.6500       5.5        78       975        92
VIS    2025250     20200   21.8000  149.6400       5.6        79       975        91
VIS    2025250     20200   21.7400  146.6400       6.0        79       995        94
VIS    2025250     20200   21.7400  146.5800       4.9        81       958        93
VIS    2025250     20200   21.7500  146.4700       5.8        86       962        96
VIS    2025250     20200   21.7600  146.4600       5.4        87       958        95
VIS    2025250     20200   21.7500  146.4300       4.6        88       921        94
VIS    2025250     20200   21.7500  146.4100       4.2        86       923        92
VIS    2025250     20200   21.7300  144.8600       8.7        87       981        91
VIS    2025250     20200   21.7200  144.7900       8.6        84       994        97
VIS    2025250     20200   21.7300  144.7700       8.4        83       994        96
VIS    2025250     20200   21.7200  144.7600       8.4        83       994        97
VIS    2025250     20200   21.7200  144.7300       7.9        81       966        99
VIS    2025250     20200   21.7300  144.7000       8.0        81       936        98
VIS    2025250     20200   21.7400  144.6800       8.5        82       914        98
VIS    2025250     20200   21.7300  144.6400       8.8        76       901        93
VIS    2025250     20200   21.7300  144.6300       8.9        76       901        94
VIS    2025250     20200   21.7200  144.5900       8.3        76       901        97
VIS    2025250     20200   21.7200  144.5700       7.5        77       906        99
VIS    2025250     20200   21.7200  144.5500       7.3        78       922        99
VIS    2025250     20200   21.7200  144.5300       7.6        80       941        99
VIS    2025250     20200   21.7400  144.5100       8.1        84       942        98
VIS    2025250     20200   21.7200  144.4800       8.7        86       905        98
VIS    2025250     20200   21.7200  144.4500       8.6        84       901        97
VIS    2025250     20200   21.7300  144.4200       8.6        84       901        93
VIS    2025250     20200   21.7200  144.4000       8.6        86       900        92
VIS    2025250     20200   21.7300  144.3800       8.8        88       899        97
VIS    2025250     20200   21.7400  144.3600       8.9        90       898        96
VIS    2025250     20200   21.7200  144.3200       9.3        84       900        94
VIS    2025250     20200   21.7200  144.3000       9.2        80       901        94
VIS    2025250     20200   21.7200  144.2700       9.3        77       902        97
VIS    2025250     20200   21.7300  144.2700       9.1        77       901        96
VIS    2025250     20200   21.7200  144.2200       8.6        77       905        99
VIS    2025250     20200   21.7400  144.2000       8.0        79       904        99
VIS    2025250     20200   21.7300  144.1700       7.8        81       905        99
VIS    2025250     20200   21.7400  144.1500       7.7        79       906        98
VIS    2025250     20200   21.7400  144.1400       7.7        80       906        98
VIS    2025250     20200   21.7400  144.1100       8.0        83       905        98
VIS    2025250     20200   21.7300  144.0800       7.9        89       907        99
VIS    2025250     20200   21.7300  144.0700       7.8        89       907        99
VIS    2025250     20200   21.7200  144.0400       7.6        86       911        99
VIS    2025250     20200   21.7100  144.0000       8.3        86       913        96
VIS    2025250     20200   21.7300  143.9900       8.6        87       916        98
VIS    2025250     20200   21.7200  143.9600       8.9        85       908        98
VIS    2025250     20200   21.7300  143.9200       9.2        85       908        98
VIS    2025250     20200   21.7200  143.9200       9.2        84       908        98
VIS    2025250     20200   21.7200  143.8900       8.7        82       907        99
VIS    2025250     20200   21.7300  143.8700       9.2        80       908        99
VIS    2025250     20200   21.7300  143.8200      10.1        82       920        96
VIS    2025250     20200   21.7300  143.8000       9.6        79       926        94
VIS    2025250     20200   21.7200  143.7700       9.2        76       929        99
VIS    2025250     20200   21.7200  143.7600       9.2        75       938        99
VIS    2025250     20200   21.7100  143.7200       9.3        82       950        99
VIS    2025250     20200   21.7200  143.7100       9.2        82       950        99
VIS    2025250     20200   21.7200  143.6800      10.1        82       950        98
VIS    2025250     20200   21.7200  143.6500      10.0        83       933        99
VIS    2025250     20200   21.7200  143.6400      10.0        82       933        99
VIS    2025250     20200   21.7300  143.6200      10.1        83       947        99
VIS    2025250     20200   21.7100  143.5900      10.5        82       939        99
VIS    2025250     20200   21.7300  143.5700      10.7        81       931        98
VIS    2025250     20200   21.7300  143.5300      10.0        79       931        99
VIS    2025250     20200   21.7300  143.5000      10.9        81       949        95
VIS    2025250     20200   21.7200  142.8000      10.0        80       973        96
VIS    2025250     20200   21.7200  142.7600       9.7        82       968        99
VIS    2025250     20200   21.7200  142.7600       9.6        82       968        99
VIS    2025250     20200   21.7300  142.7300       9.4        81       961        99
VIS    2025250     20200   21.7200  142.6900      10.5        79       975       100
VIS    2025250     20200   21.7200  142.6600      10.0        83       973        99
VIS    2025250     20200   21.7200  142.6600      10.0        84       973        99
VIS    2025250     20200   21.7200  142.6100       9.6        84       927        99
VIS    2025250     20200   21.7200  142.5700       9.8        88       929        99
VIS    2025250     20200   21.7200  142.5600       9.9        91       937        99
VIS    2025250     20200   21.7100  142.5300      10.9        96       953        95
VIS    2025250     20200   21.7200  142.4800      10.2        92       961        96
VIS    2025250     20200   21.7000  142.3400       9.4        85       991        90
VIS    2025250     20200   21.7000  142.3300       9.6        84       991        92
VIS    2025250     20200   21.7000  142.1400       9.8        86       980        97
VIS    2025250     20200   21.7000  142.1200       9.4        86       980        98
VIS    2025250     20200   21.7000  142.1100       9.3        86       968        98
VIS    2025250     20200   21.7100  142.0700       8.5        84       973        94
VIS    2025250     20200   21.7200  142.0400       8.2        83       976        91
VIS    2025250     20200   21.7200  142.0200       8.3        82       965        92
VIS    2025250     20200   21.7200  142.0100       8.4        82       958        93
VIS    2025250     20200   21.7100  141.9900       9.1        83       926        99
VIS    2025250     20200   21.7200  141.9600       9.3        85       931        99
VIS    2025250     20200   21.7200  141.9200       9.7        82       941       100
VIS    2025250     20200   21.7200  141.9000       9.7        81       932        99
VIS    2025250     20200   21.7000  141.8700       9.8        79       929        96
VIS    2025250     20200   21.7000  141.8600       9.3        79       928        94
VIS    2025250     20200   21.7000  141.8400       8.8        82       928        95
VIS    2025250     20200   21.7200  141.8000       9.3        89       943        96
VIS    2025250     20200   21.7200  141.7900       9.6        89       945        95
VIS    2025250     20200   21.7200  141.7600       9.7        86       943        98
VIS    2025250     20200   21.7100  141.7200       9.7        81       943        99
VIS    2025250     20200   21.7000  141.7100       9.6        81       944        99
VIS    2025250     20200   21.7200  141.6700       9.7        80       934        99
VIS    2025250     20200   21.7200  141.6700       9.7        80       933        99
VIS    2025250     20200   21.7100  141.6300       9.7        79       933        98
VIS    2025250     20200   21.7000  141.6100       9.9        79       936        98
VIS    2025250     20200   21.7000  141.5900       9.6        79       940        98
VIS    2025250     20200   21.7200  141.5500       8.8        80       940        95
VIS    2025250     20200   21.7200  141.5300       8.9        83       964        93
VIS    2025250     20200   21.7200  141.5000       9.3        86       972        93
VIS    2025250     20200   21.7100  141.4800       9.9        86       973        93
VIS    2025250     20200   21.7200  141.4600      10.2        86       972        96
VIS    2025250     20200   21.7100  141.4300      10.0        87       958        98
VIS    2025250     20200   21.7100  141.4200       9.8        86       958        98
VIS    2025250     20200   21.7000  141.3800       9.3        81       934        96
VIS    2025250     20200   21.7100  141.3600       9.0        83       937        97
VIS    2025250     20200   21.7200  141.3400       8.6        85       938        97
VIS    2025250     20200   21.7200  141.3100       8.0        89       944        95
VIS    2025250     20200   21.7000  141.2900       8.5        89       944        93
VIS    2025250     20200   21.7000  141.2600       9.0        90       952        95
VIS    2025250     20200   21.7200  141.2400       9.1        92       952        95
VIS    2025250     20200   21.7000  141.2200       9.1        91       928        97
VIS    2025250     20200   21.7000  141.1900       8.7        88       925        99
VIS    2025250     20200   21.7200  141.1500       9.3        85       926        99
VIS    2025250     20200   21.7100  141.1500       9.2        86       926       100
VIS    2025250     20200   21.7000  141.1200       9.2        85       926       100
VIS    2025250     20200   21.7000  141.0800       9.2        83       926       100
VIS    2025250     20200   21.7000  141.0800       9.2        84       926       100
VIS    2025250     20200   21.7200  141.0500       8.7        86       925        99
VIS    2025250     20200   21.7100  141.0200       8.4        88       925        98
VIS    2025250     20200   21.7100  141.0000       8.3        88       924        94
VIS    2025250     20200   21.6900  140.9700       8.4        85       925        96
VIS    2025250     20200   21.6900  140.9500       8.4        84       926        95
VIS    2025250     20200   21.7000  140.9200       8.4        85       924        96
VIS    2025250     20200   21.7000  140.8900       8.6        86       925        98
VIS    2025250     20200   21.7100  140.8600       8.5        86       925        98
VIS    2025250     20200   21.7100  140.8400       8.5        86       925        98
VIS    2025250     20200   21.7100  140.8100       8.5        86       925        98
VIS    2025250     20200   21.7000  140.7900       8.4        85       927        98
VIS    2025250     20200   21.7100  140.7700       8.7        84       928        97
VIS    2025250     20200   21.6900  140.7500       8.9        82       928        99
VIS    2025250     20200   21.7100  140.7200       9.5        80       929        99
VIS    2025250     20200   21.7100  140.6900       9.9        74       938        99
VIS    2025250     20200   21.7100  140.6600       9.6        77       927        99
VIS    2025250     20200   21.7100  140.6600       9.5        77       927        99
VIS    2025250     20200   21.6900  140.6200       8.6        82       925        98
VIS    2025250     20200   21.6900  140.6000       8.6        84       923        99
VIS    2025250     20200   21.6900  140.5800       8.7        83       923        99
VIS    2025250     20200   21.7100  140.5600       8.7        84       923        97
VIS    2025250     20200   21.7000  140.5200       9.0        84       926        99
VIS    2025250     20200   21.6900  140.4900       8.8        85       930        99
VIS    2025250     20200   21.6900  140.4800       8.8        85       930        98
VIS    2025250     20200   21.6900  140.4600       8.8        85       931        98
VIS    2025250     20200   21.7500  149.7100       5.4        86       939        90
VIS    2025250     20200   21.7500  149.6700       5.5        81       948        90
VIS    2025250     20200   21.7200  146.6400       5.8        74       995        96
VIS    2025250     20200   21.7300  146.5700       5.0        82       956        94
VIS    2025250     20200   21.7100  146.4800       6.0        85       946        97
VIS    2025250     20200   21.7300  146.4700       5.7        85       958        95
VIS    2025250     20200   21.7200  146.4400       4.8        86       938        97
VIS    2025250     20200   21.7300  146.4200       4.4        89       929        94
VIS    2025250     20200   21.7000  144.8700       8.4        88       980        94
VIS    2025250     20200   21.7000  144.8600       8.4        88       980        94
VIS    2025250     20200   21.7000  144.8200       8.9        85       970        96
VIS    2025250     20200   21.7000  144.8000       9.1        83       982        96
VIS    2025250     20200   21.7200  144.7700       8.5        82       994        97
VIS    2025250     20200   21.7000  144.7400       8.2        75       966        99
VIS    2025250     20200   21.6900  144.7100       8.1        71       903        97
VIS    2025250     20200   21.7000  144.7000       8.1        73       903        98
VIS    2025250     20200   21.7100  144.6700       8.8        76       901        98
VIS    2025250     20200   21.7100  144.6600       8.9        77       901        98
VIS    2025250     20200   21.7000  144.6300       8.7        77       901        98
VIS    2025250     20200   21.7000  144.5900       8.4        76       901        98
VIS    2025250     20200   21.7100  144.5700       7.6        76       905        99
VIS    2025250     20200   21.6900  144.5600       8.1        78       900        99
VIS    2025250     20200   21.6900  144.5200       8.7        81       900        99
VIS    2025250     20200   21.7000  144.4900       8.8        86       901        99
VIS    2025250     20200   21.7000  144.4800       8.9        86       901        98
VIS    2025250     20200   21.7000  144.4600       8.9        86       901        97
VIS    2025250     20200   21.7000  144.4100       8.4        85       900        98
VIS    2025250     20200   21.7100  144.3900       8.7        88       900        97
VIS    2025250     20200   21.7100  144.3800       8.8        88       900        98
VIS    2025250     20200   21.7000  144.3400       9.3        85       900        97
VIS    2025250     20200   21.6900  144.3200       9.4        82       901        95
VIS    2025250     20200   21.6900  144.3000       9.5        78       902        97
VIS    2025250     20200   21.7100  144.2700       9.3        77       902        97
VIS    2025250     20200   21.7100  144.2600       9.1        78       903        98
VIS    2025250     20200   21.7000  144.2300       8.8        80       905        99
VIS    2025250     20200   21.7100  144.2100       8.5        78       905        99
VIS    2025250     20200   21.7100  144.1700       8.0        82       905        99
VIS    2025250     20200   21.7000  144.1500       8.2        85       904        99
VIS    2025250     20200   21.6900  144.1300       8.1        84       904        99
VIS    2025250     20200   21.6900  144.1000       7.9        87       905        99
VIS    2025250     20200   21.7100  144.0900       8.1        89       906        98
VIS    2025250     20200   21.7000  144.0500       7.6        86       913        99
VIS    2025250     20200   21.6900  144.0100       8.0        81       910        97
VIS    2025250     20200   21.7000  144.0000       8.4        85       910        93
VIS    2025250     20200   21.7000  143.9700       8.7        84       907        92
VIS    2025250     20200   21.6900  143.9500       8.8        83       906        94
VIS    2025250     20200   21.6900  143.9400       9.1        81       906        98
VIS    2025250     20200   21.6900  143.9100       9.4        82       905        98
VIS    2025250     20200   21.7100  143.8800       8.5        82       907       100
VIS    2025250     20200   21.7100  143.8600       8.5        82       907       100
VIS    2025250     20200   21.7000  143.8300       9.2        79       908        98
VIS    2025250     20200   21.6900  143.7900       9.1        78       915        96
VIS    2025250     20200   21.6900  143.7900       9.2        79       915        97
VIS    2025250     20200   21.7100  143.7600       9.3        77       934        99
VIS    2025250     20200   21.7100  143.7200       9.2        84       950        99
VIS    2025250     20200   21.7000  143.6900      10.1        84       951        98
VIS    2025250     20200   21.7000  143.6700      10.6        81       942        98
VIS    2025250     20200   21.7000  143.6400      10.1        81       931        99
VIS    2025250     20200   21.6900  143.6200       9.6        84       948        99
VIS    2025250     20200   21.6900  143.6100       9.5        85       948        98
VIS    2025250     20200   21.7000  143.5700      10.0        78       932        99
VIS    2025250     20200   21.7000  143.5600       9.8        78       932        99
VIS    2025250     20200   21.7000  143.5400       8.9        78       928       100
VIS    2025250     20200   21.6900  143.4900      10.5        82       952        98
VIS    2025250     20200   21.7000  142.7700       9.9        82       974        97
VIS    2025250     20200   21.6900  142.6200       9.5        85       958        99
VIS    2025250     20200   21.6900  142.6100       9.5        85       957        99
VIS    2025250     20200   21.7000  142.5900       9.5        88       957        96
VIS    2025250     20200   21.7000  142.5500      10.2        93       975        96
VIS    2025250     20200   21.6800  142.5200      10.1        89       975        97
VIS    2025250     20200   21.6800  142.5100       9.8        88       975        97
VIS    2025250     20200   21.6900  142.4900       9.8        88       966        98
VIS    2025250     20200   21.6800  142.4500       8.9        81       943        98
VIS    2025250     20200   21.6800  142.3700       9.2        83       991        91
VIS    2025250     20200   21.6800  142.3400       9.6        81       979        98
VIS    2025250     20200   21.6800  142.2400       9.3        82       993        93
VIS    2025250     20200   21.6800  142.2100       9.5        83       986        98
VIS    2025250     20200   21.6800  142.1900       9.9        85       974        99
VIS    2025250     20200   21.6800  142.1800      10.2        85       974        99
VIS    2025250     20200   21.6900  142.1400       9.8        85       980        98
VIS    2025250     20200   21.7000  142.1200       9.4        85       968        97
VIS    2025250     20200   21.6900  142.0900       9.2        86       931        98
VIS    2025250     20200   21.7000  142.0800       8.8        86       946        97
VIS    2025250     20200   21.6900  142.0400       8.9        83       928        97
VIS    2025250     20200   21.6700  142.0300       9.6        82       926        97
VIS    2025250     20200   21.6900  142.0000       9.2        82       925        99
VIS    2025250     20200   21.6800  141.9600       9.6        82       924        98
VIS    2025250     20200   21.6700  141.9600       9.6        83       924        97
VIS    2025250     20200   21.6800  141.9200       9.7        81       940        99
VIS    2025250     20200   21.6900  141.9000      10.0        79       940       100
VIS    2025250     20200   21.6900  141.8600       9.6        79       929        96
VIS    2025250     20200   21.6900  141.8500       9.3        81       929        94
VIS    2025250     20200   21.6700  141.8200       9.0        85       961        94
VIS    2025250     20200   21.6700  141.8000       9.5        85       964        97
VIS    2025250     20200   21.6900  141.7700      10.0        87       944        96
VIS    2025250     20200   21.6800  141.7500       9.9        86       943        98
VIS    2025250     20200   21.6900  141.7400       9.9        83       943        99
VIS    2025250     20200   21.6800  141.7000       9.8        79       958       100
VIS    2025250     20200   21.6800  141.6900       9.8        79       952       100
VIS    2025250     20200   21.6800  141.6400      10.2        77       936        98
VIS    2025250     20200   21.6800  141.6400      10.2        77       936        98
VIS    2025250     20200   21.6800  141.6000      10.0        78       940        97
VIS    2025250     20200   21.6900  141.5900       9.7        79       940        98
VIS    2025250     20200   21.6900  141.5400       9.2        86       964        92
VIS    2025250     20200   21.6700  141.5000       9.8        89       947        93
VIS    2025250     20200   21.6700  141.4700       9.9        88       947        96
VIS    2025250     20200   21.6700  141.4500       9.9        87       939        98
VIS    2025250     20200   21.6800  141.4400      10.0        88       947        98
VIS    2025250     20200   21.6800  141.4000       9.4        82       933        99
VIS    2025250     20200   21.6700  141.3900       9.4        82       932        99
VIS    2025250     20200   21.6700  141.3700       9.1        81       932        98
VIS    2025250     20200   21.6700  141.3400       8.9        82       928        95
VIS    2025250     20200   21.6700  141.3100       8.8        89       931        96
VIS    2025250     20200   21.6800  141.2900       8.8        91       938        94
VIS    2025250     20200   21.6900  141.2600       9.1        91       939        96
VIS    2025250     20200   21.6800  141.2300       9.1        88       927        97
VIS    2025250     20200   21.6700  141.2100       8.8        86       925        98
VIS    2025250     20200   21.6700  141.1800       8.6        87       925        99
VIS    2025250     20200   21.6700  141.1500       8.5        89       924        99
VIS    2025250     20200   21.6700  141.1400       8.6        89       924        99
VIS    2025250     20200   21.6900  141.1100       9.2        86       926       100
VIS    2025250     20200   21.6900  141.0800       9.2        84       926       100
VIS    2025250     20200   21.6700  141.0600       9.1        82       926        98
VIS    2025250     20200   21.6700  141.0500       8.7        82       926        97
VIS    2025250     20200   21.6800  141.0100       8.1        85       926        98
VIS    2025250     20200   21.6800  140.9800       8.2        84       926        98
VIS    2025250     20200   21.6800  140.9700       8.3        84       926        97
VIS    2025250     20200   21.6800  140.9400       8.4        85       926        95
VIS    2025250     20200   21.6700  140.9200       8.4        84       926        95
VIS    2025250     20200   21.6700  140.8800       8.6        85       926        97
VIS    2025250     20200   21.6800  140.8600       8.6        85       925        98
VIS    2025250     20200   21.6900  140.8400       8.4        85       925        98
VIS    2025250     20200   21.6800  140.8000       8.4        85       927        97
VIS    2025250     20200   21.6900  140.8000       8.4        84       927        98
VIS    2025250     20200   21.6900  140.7700       8.6        83       930        99
VIS    2025250     20200   21.6800  140.7400       8.8        83       929        99
VIS    2025250     20200   21.6700  140.7000       8.6        80       943        97
VIS    2025250     20200   21.6900  140.7000       9.3        75       942        99
VIS    2025250     20200   21.6700  140.6600       9.6        77       945        98
VIS    2025250     20200   21.6700  140.6300       9.1        78       930        98
VIS    2025250     20200   21.6800  140.6200       8.7        82       925        98
VIS    2025250     20200   21.6800  140.6000       8.7        82       925        99
VIS    2025250     20200   21.6800  140.5600       9.0        82       926        99
VIS    2025250     20200   21.6800  140.5500       9.0        82       927       100
VIS    2025250     20200   21.6900  140.5100       8.9        85       929        99
VIS    2025250     20200   21.6900  140.4900       8.8        85       930        98
VIS    2025250     20200   21.6700  140.4700       8.7        83       932        97
VIS    2025250     20200   21.6700  140.4500       8.7        83       933        97
VIS    2025250     20200   21.7400  149.6700       5.6        82       948        90
VIS    2025250     20200   21.6900  146.6700       6.3        66       952        93
VIS    2025250     20200   21.6900  146.4700       6.2        94       944        97
VIS    2025250     20200   21.7000  146.4700       5.8        91       944        97
VIS    2025250     20200   21.6900  146.4400       4.8        89       930        95
VIS    2025250     20200   21.6800  144.8300       8.6        85       955        97
VIS    2025250     20200   21.6700  144.8300       8.7        84       955        97
VIS    2025250     20200   21.6800  144.8100       9.1        83       959        97
VIS    2025250     20200   21.6700  144.7800       8.7        79       959        93
VIS    2025250     20200   21.6900  144.7500       8.5        73       966       100
VIS    2025250     20200   21.6900  144.7200       8.2        69       904        97
VIS    2025250     20200   21.6800  144.7100       8.6        68       903        94
VIS    2025250     20200   21.6700  144.6800       9.1        80       900        97
VIS    2025250     20200   21.6800  144.6600       9.1        81       900        98
VIS    2025250     20200   21.6700  144.6200       8.9        77       901        97
VIS    2025250     20200   21.6900  144.5900       8.6        75       900        98
VIS    2025250     20200   21.6800  144.5700       8.5        78       900        99
VIS    2025250     20200   21.6700  144.5400       8.9        79       900        98
VIS    2025250     20200   21.6900  144.5200       8.8        81       900        98
VIS    2025250     20200   21.6900  144.4900       9.0        84       901        99
VIS    2025250     20200   21.6900  144.4800       9.1        86       900        98
VIS    2025250     20200   21.6900  144.4600       9.0        87       900        99
VIS    2025250     20200   21.6900  144.4300       8.5        86       900        99
VIS    2025250     20200   21.6900  144.4000       8.5        86       900        98
VIS    2025250     20200   21.6700  144.3700       8.7        89       900        93
VIS    2025250     20200   21.6700  144.3400       9.1        89       901        92
VIS    2025250     20200   21.6900  144.3200       9.4        81       902        96
VIS    2025250     20200   21.6800  144.3000       9.3        80       903        98
VIS    2025250     20200   21.6900  144.2800       9.4        77       903        97
VIS    2025250     20200   21.6800  144.2500       9.1        83       904        99
VIS    2025250     20200   21.6600  144.2100       8.4        80       904        98
VIS    2025250     20200   21.6600  144.2000       8.3        80       904        99
VIS    2025250     20200   21.6800  144.1700       8.5        84       904        99
VIS    2025250     20200   21.6800  144.1400       8.2        83       904       100
VIS    2025250     20200   21.6700  144.1200       7.7        84       904       100
VIS    2025250     20200   21.6600  144.1100       7.6        84       906        99
VIS    2025250     20200   21.6800  144.0600       7.9        88       911        98
VIS    2025250     20200   21.6700  144.0500       7.8        86       911        99
VIS    2025250     20200   21.6600  144.0200       8.0        78       910        99
VIS    2025250     20200   21.6700  144.0100       8.1        79       910        98
VIS    2025250     20200   21.6800  143.9700       8.6        83       907        94
VIS    2025250     20200   21.6800  143.9500       8.8        83       906        95
VIS    2025250     20200   21.6700  143.9200       9.3        81       905        98
VIS    2025250     20200   21.6800  143.9100       9.5        82       905        98
VIS    2025250     20200   21.6600  143.8700       7.7        83       905       100
VIS    2025250     20200   21.6700  143.8400       8.2        80       907        99
VIS    2025250     20200   21.6800  143.8400       8.4        76       907        96
VIS    2025250     20200   21.6800  143.7900       9.1        80       915        97
VIS    2025250     20200   21.6800  143.7900       9.2        81       915        98
VIS    2025250     20200   21.6700  143.7500       8.8        94       933        96
VIS    2025250     20200   21.6700  143.7400       8.6        94       946        96
VIS    2025250     20200   21.6700  143.7100       8.7        94       958        93
VIS    2025250     20200   21.6800  143.6700      10.8        82       972        98
VIS    2025250     20200   21.6800  143.6400      10.2        82       942        99
VIS    2025250     20200   21.6800  143.6300       9.7        84       949        99
VIS    2025250     20200   21.6800  143.6100       9.5        85       949        99
VIS    2025250     20200   21.6800  143.5800       9.8        82       945        99
VIS    2025250     20200   21.6700  143.5400       9.4        78       939       100
VIS    2025250     20200   21.6700  143.5200       9.5        80       939       100
VIS    2025250     20200   21.6600  143.5000       9.9        84       946        99
VIS    2025250     20200   21.6600  143.4900       9.6        81       948        98
VIS    2025250     20200   21.6500  142.8800       8.5        84       987        96
VIS    2025250     20200   21.6500  142.8700       9.8        83       995        98
VIS    2025250     20200   21.6500  142.8400      11.0        82       981        97
VIS    2025250     20200   21.6700  142.6400       9.4        84       988        94
VIS    2025250     20200   21.6700  142.6200       9.2        84       978        96
VIS    2025250     20200   21.6500  142.5800       9.1        89       970        95
VIS    2025250     20200   21.6600  142.5700       9.1        88       970        94
VIS    2025250     20200   21.6700  142.5400       9.7        88       975        96
VIS    2025250     20200   21.6700  142.5300       9.7        87       975        97
VIS    2025250     20200   21.6700  142.5000       9.2        84       937        96
VIS    2025250     20200   21.6700  142.4700       8.9        81       942        98
VIS    2025250     20200   21.6700  142.4500       9.1        79       942        99
VIS    2025250     20200   21.6700  142.4200       9.7        78       943        98
VIS    2025250     20200   21.6600  142.4100      10.3        78       943        98
VIS    2025250     20200   21.6500  142.3600       9.6        80       957        99
VIS    2025250     20200   21.6700  142.3400       9.5        81       951        98
VIS    2025250     20200   21.6600  142.3200       9.7        80       951        99
VIS    2025250     20200   21.6600  142.2900       9.9        80       952        99
VIS    2025250     20200   21.6700  142.2800      10.1        80       952        99
VIS    2025250     20200   21.6700  142.2400       9.3        83       985        95
VIS    2025250     20200   21.6600  142.2100       9.6        84       974        99
VIS    2025250     20200   21.6700  142.2000       9.6        84       974        98
VIS    2025250     20200   21.6600  142.1700      10.1        85       948        99
VIS    2025250     20200   21.6700  142.1500      10.1        85       960        99
VIS    2025250     20200   21.6700  142.1300       9.8        85       931       100
VIS    2025250     20200   21.6500  142.0900       9.8        84       928       100
VIS    2025250     20200   21.6500  142.0700      10.1        82       927        99
VIS    2025250     20200   21.6500  142.0500      10.0        82       927        98
VIS    2025250     20200   21.6600  142.0300       9.8        83       926        97
VIS    2025250     20200   21.6600  142.0000       9.4        84       924        97
VIS    2025250     20200   21.6500  141.9900       9.5        84       924        96
VIS    2025250     20200   21.6600  141.9600       9.5        84       924        94
VIS    2025250     20200   21.6500  141.9400       9.3        88       929        98
VIS    2025250     20200   21.6700  141.8900      10.2        79       953       100
VIS    2025250     20200   21.6600  141.8800      10.1        80       959        99
VIS    2025250     20200   21.6700  141.8500       9.4        83       944        96
VIS    2025250     20200   21.6600  141.8200       9.2        85       960        96
VIS    2025250     20200   21.6500  141.7900       9.8        83       951        99
VIS    2025250     20200   21.6500  141.7800       9.8        84       944        99
VIS    2025250     20200   21.6500  141.7600       9.6        85       941        99
VIS    2025250     20200   21.6600  141.7400      10.0        84       943        99
VIS    2025250     20200   21.6500  141.7200      10.3        82       959        99
VIS    2025250     20200   21.6700  141.6600      10.2        78       954        99
VIS    2025250     20200   21.6500  141.6100      10.7        79       967       100
VIS    2025250     20200   21.6600  141.5800      10.3        80       959        98
VIS    2025250     20200   21.6600  141.5500       9.3        87       973        91
VIS    2025250     20200   21.6500  141.5300       9.4        91       951        96
VIS    2025250     20200   21.6600  141.5200       9.6        91       947        94
VIS    2025250     20200   21.6700  141.4800       9.8        87       947        96
VIS    2025250     20200   21.6700  141.4600       9.9        87       947        98
VIS    2025250     20200   21.6600  141.4300       9.6        85       933       100
VIS    2025250     20200   21.6600  141.4200       9.6        85       931       100
VIS    2025250     20200   21.6700  141.3900       9.3        82       932        99
VIS    2025250     20200   21.6700  141.3600       9.0        82       928        98
VIS    2025250     20200   21.6500  141.3300       9.0        84       928        99
VIS    2025250     20200   21.6600  141.3200       8.9        86       928        96
VIS    2025250     20200   21.6600  141.2900       9.1        92       932        96
VIS    2025250     20200   21.6500  141.2600       9.2        87       927        96
VIS    2025250     20200   21.6600  141.2500       9.1        87       927        94
VIS    2025250     20200   21.6700  141.2100       8.8        85       925        98
VIS    2025250     20200   21.6600  141.1800       8.5        87       924        99
VIS    2025250     20200   21.6500  141.1700       8.4        87       924        97
VIS    2025250     20200   21.6700  141.1300       8.5        88       925        99
VIS    2025250     20200   21.6500  141.1000       8.7        85       926        99
VIS    2025250     20200   21.6500  141.0900       8.9        85       927        99
VIS    2025250     20200   21.6500  141.0600       9.1        82       927       100
VIS    2025250     20200   21.6600  141.0400       8.9        81       927        96
VIS    2025250     20200   21.6500  141.0200       8.6        82       927        97
VIS    2025250     20200   21.6600  140.9900       8.1        83       926        98
VIS    2025250     20200   21.6500  140.9600       8.3        83       927        97
VIS    2025250     20200   21.6600  140.9500       8.3        84       927        97
VIS    2025250     20200   21.6500  140.9300       8.4        84       927        94
VIS    2025250     20200   21.6500  140.9000       8.5        85       927        91
VIS    2025250     20200   21.6400  140.8700       8.5        85       926        97
VIS    2025250     20200   21.6500  140.8500       8.4        85       925        99
VIS    2025250     20200   21.6400  140.8100       8.7        82       929        98
VIS    2025250     20200   21.6400  140.8000       8.7        82       931        98
VIS    2025250     20200   21.6500  140.7800       8.7        84       931        99
VIS    2025250     20200   21.6500  140.7300       8.6        83       934        97
VIS    2025250     20200   21.6500  140.7100       8.6        83       944        98
VIS    2025250     20200   21.6600  140.6900       8.7        81       944        98
VIS    2025250     20200   21.6600  140.6800       9.3        80       945        98
VIS    2025250     20200   21.6600  140.6400       9.5        77       937        99
VIS    2025250     20200   21.6600  140.6300       9.1        78       933        99
VIS    2025250     20200   21.6600  140.6100       8.8        80       928        99
VIS    2025250     20200   21.6500  140.5800       8.7        82       931        99
VIS    2025250     20200   21.6600  140.5500       8.7        83       928        99
VIS    2025250     20200   21.6600  140.5100       8.7        84       931        96
VIS    2025250     20200   21.6600  140.5100       8.8        84       931        97
VIS    2025250     20200   21.6500  140.4600       8.7        82       936        98
VIS    2025250     20200   21.6400  140.4400       8.7        84       936        99
VIS    2025250     20200   21.6900  147.8000       4.3        85       910        96
VIS    2025250     20200   21.6800  147.7800       4.5        88       910        93
VIS    2025250     20200   21.6600  146.6800       6.5        66       948        94
VIS    2025250     20200   21.6600  146.6700       6.5        66       948        95
VIS    2025250     20200   21.6700  146.4800       6.6       100       944        90
VIS    2025250     20200   21.6700  146.4700       6.4        98       930        95
VIS    2025250     20200   21.6800  146.4300       5.1        91       904        93
VIS    2025250     20200   21.6700  146.4100       4.4        84       920        94
VIS    2025250     20200   21.6600  144.8500       8.2        87       955        92
VIS    2025250     20200   21.6500  144.8200       8.8        80       923        97
VIS    2025250     20200   21.6400  144.7800       8.6        74       910        94
VIS    2025250     20200   21.6600  144.7600       8.4        75       926        96
VIS    2025250     20200   21.6500  144.7500       8.5        73       910        98
VIS    2025250     20200   21.6500  144.7000       8.8        75       900        96
VIS    2025250     20200   21.6500  144.6900       8.8        78       900        97
VIS    2025250     20200   21.6500  144.6700       8.8        82       900        94
VIS    2025250     20200   21.6500  144.6400       8.5        83       900        96
VIS    2025250     20200   21.6400  144.6200       8.5        82       900        95
VIS    2025250     20200   21.6600  144.5800       9.0        81       900        98
VIS    2025250     20200   21.6600  144.5600       9.1        80       900        98
VIS    2025250     20200   21.6600  144.5400       9.0        81       899        98
VIS    2025250     20200   21.6500  144.5200       9.0        84       899        98
VIS    2025250     20200   21.6600  144.4900       9.1        85       899        99
VIS    2025250     20200   21.6600  144.4600       9.3        85       898        98
VIS    2025250     20200   21.6600  144.4400       9.1        85       899        98
VIS    2025250     20200   21.6400  144.4000       8.8        85       900        97
VIS    2025250     20200   21.6400  144.3900       8.7        86       900        97
VIS    2025250     20200   21.6600  144.3100       9.0        82       903        98
VIS    2025250     20200   21.6500  144.3000       8.9        82       903        99
VIS    2025250     20200   21.6600  144.2800       9.1        81       903        98
VIS    2025250     20200   21.6400  144.2300       8.9        80       904        99
VIS    2025250     20200   21.6600  144.2200       8.5        81       904        99
VIS    2025250     20200   21.6500  144.2000       8.3        81       904        99
VIS    2025250     20200   21.6400  144.1800       8.5        82       904        98
VIS    2025250     20200   21.6400  144.1300       8.4        81       905        97
VIS    2025250     20200   21.6400  144.1300       8.3        81       906        98
VIS    2025250     20200   21.6400  144.1000       7.9        81       907       100
VIS    2025250     20200   21.6500  144.0600       7.9        82       911        99
VIS    2025250     20200   21.6400  144.0300       8.3        80       910        99
VIS    2025250     20200   21.6500  144.0300       8.1        79       910        99
VIS    2025250     20200   21.6400  144.0000       8.9        79       906        98
VIS    2025250     20200   21.6400  143.9800       9.2        80       904        98
VIS    2025250     20200   21.6600  143.9500       9.0        82       905        99
VIS    2025250     20200   21.6400  143.9300       9.1        83       905        98
VIS    2025250     20200   21.6400  143.9000       8.5        87       905        97
VIS    2025250     20200   21.6500  143.8600       7.8        83       905       100
VIS    2025250     20200   21.6400  143.8400       8.3        85       905       100
VIS    2025250     20200   21.6400  143.8100       8.7        84       910        96
VIS    2025250     20200   21.6400  143.7900       9.1        84       914        94
VIS    2025250     20200   21.6400  143.7800       9.1        84       915        95
VIS    2025250     20200   21.6400  143.7300       8.5        96       917        96
VIS    2025250     20200   21.6400  143.7200       8.5        96       922        91
VIS    2025250     20200   21.6500  143.6800       9.2        92       961        94
VIS    2025250     20200   21.6400  143.6800       9.3        92       960        93
VIS    2025250     20200   21.6400  143.6300       9.4        84       976        98
VIS    2025250     20200   21.6600  143.6100       9.6        80       966        98
VIS    2025250     20200   21.6300  143.5700      11.1        81       956        91
VIS    2025250     20200   21.6500  143.5500      10.0        81       939        99
VIS    2025250     20200   21.6500  143.5200       9.7        82       939        99
VIS    2025250     20200   21.6500  143.5000       9.6        84       946        99
VIS    2025250     20200   21.6300  143.4600       9.5        80       952        95
VIS    2025250     20200   21.6300  142.9100       9.4        89       987        95
VIS    2025250     20200   21.6400  142.9000       9.0        88       987        95
VIS    2025250     20200   21.6400  142.8800       8.8        85       954        97
VIS    2025250     20200   21.6400  142.8000      10.1        71       954        97
VIS    2025250     20200   21.6300  142.6100       9.4        93       970        90
VIS    2025250     20200   21.6500  142.5900       9.3        88       970        96
VIS    2025250     20200   21.6500  142.5800       9.2        88       970        96
VIS    2025250     20200   21.6300  142.5500       9.2        83       926        99
VIS    2025250     20200   21.6300  142.5100       9.3        80       927        97
VIS    2025250     20200   21.6400  142.5100       9.1        82       933        98
VIS    2025250     20200   21.6400  142.4700       9.1        79       933        99
VIS    2025250     20200   21.6300  142.4600       9.2        79       929        99
VIS    2025250     20200   21.6500  142.4300       9.7        81       939        99
VIS    2025250     20200   21.6300  142.4000       9.5        85       953        98
VIS    2025250     20200   21.6500  142.3700       9.7        81       957        99
VIS    2025250     20200   21.6300  142.3600       9.5        81       957        99
VIS    2025250     20200   21.6300  142.3200       9.4        82       942        98
VIS    2025250     20200   21.6300  142.3100       9.3        83       946        98
VIS    2025250     20200   21.6300  142.2800       9.4        84       952        97
VIS    2025250     20200   21.6500  142.2500       9.3        84       962        96
VIS    2025250     20200   21.6500  142.2300       9.4        85       952        97
VIS    2025250     20200   21.6400  142.2100       9.6        83       944        99
VIS    2025250     20200   21.6500  142.1700      10.1        85       931       100
VIS    2025250     20200   21.6400  142.1400       9.9        83       925       100
VIS    2025250     20200   21.6400  142.1300       9.9        83       928       100
VIS    2025250     20200   21.6200  142.1100       9.9        81       924        99
VIS    2025250     20200   21.6400  142.0700      10.2        82       927        99
VIS    2025250     20200   21.6400  142.0500      10.2        80       927        98
VIS    2025250     20200   21.6400  142.0400      10.2        80       927        98
VIS    2025250     20200   21.6400  142.0200       9.7        83       927        98
VIS    2025250     20200   21.6300  141.9700       9.2        83       930        97
VIS    2025250     20200   21.6300  141.9600       9.2        85       940        97
VIS    2025250     20200   21.6400  141.9400       9.3        88       940        97
VIS    2025250     20200   21.6300  141.9100       9.7        85       973        98
VIS    2025250     20200   21.6200  141.8800       9.7        83       964        96
VIS    2025250     20200   21.6200  141.8500       9.8        88       946        97
VIS    2025250     20200   21.6300  141.8400       9.8        88       953        97
VIS    2025250     20200   21.6300  141.8100      10.1        84       951        99
VIS    2025250     20200   21.6400  141.7900       9.8        83       943       100
VIS    2025250     20200   21.6400  141.7500       9.8        85       943        98
VIS    2025250     20200   21.6300  141.7400       9.9        84       943        99
VIS    2025250     20200   21.6400  141.6900       9.9        83       969        99
VIS    2025250     20200   21.6300  141.6200      10.4        80       970        99
VIS    2025250     20200   21.6300  141.6000      10.5        80       973        98
VIS    2025250     20200   21.6300  141.5500       9.3        87       951        92
VIS    2025250     20200   21.6400  141.5400       9.3        90       951        96
VIS    2025250     20200   21.6400  141.5100       9.4        90       928        97
VIS    2025250     20200   21.6400  141.4800       9.4        84       925        96
VIS    2025250     20200   21.6300  141.4700       9.4        81       924        97
VIS    2025250     20200   21.6300  141.4500       9.4        81       924        99
VIS    2025250     20200   21.6400  141.4100       9.4        84       925        99
VIS    2025250     20200   21.6400  141.3800       9.3        84       925        99
VIS    2025250     20200   21.6400  141.3500       9.2        83       928        99
VIS    2025250     20200   21.6300  141.3400       9.2        83       928        99
VIS    2025250     20200   21.6300  141.3100       9.1        88       927        99
VIS    2025250     20200   21.6300  141.2800       9.3        88       926        97
VIS    2025250     20200   21.6300  141.2600       9.1        85       927        97
VIS    2025250     20200   21.6300  141.2300       8.9        82       926        97
VIS    2025250     20200   21.6200  141.2100       8.7        81       925        96
VIS    2025250     20200   21.6300  141.2000       8.7        83       925        96
VIS    2025250     20200   21.6200  141.1700       8.3        85       925        97
VIS    2025250     20200   21.6200  141.1500       8.4        84       925        98
VIS    2025250     20200   21.6400  141.1100       8.5        84       926        99
VIS    2025250     20200   21.6300  141.1000       8.5        83       926        99
VIS    2025250     20200   21.6400  141.0700       9.0        83       927       100
VIS    2025250     20200   21.6400  141.0400       8.9        82       927        98
VIS    2025250     20200   21.6300  141.0300       8.8        83       927        96
VIS    2025250     20200   21.6400  141.0000       8.3        82       927        93
VIS    2025250     20200   21.6200  140.9700       8.4        81       927        95
VIS    2025250     20200   21.6400  140.9600       8.3        83       927        95
VIS    2025250     20200   21.6200  140.9300       8.5        82       929        96
VIS    2025250     20200   21.6200  140.9000       8.5        83       929        97
VIS    2025250     20200   21.6200  140.8800       8.6        84       928        98
VIS    2025250     20200   21.6300  140.8500       8.5        85       928        98
VIS    2025250     20200   21.6200  140.8100       8.9        82       931        98
VIS    2025250     20200   21.6400  140.8100       8.8        82       929        97
VIS    2025250     20200   21.6200  140.7700       8.8        84       940        98
VIS    2025250     20200   21.6200  140.7400       9.0        85       937        99
VIS    2025250     20200   21.6200  140.7300       8.9        85       940        98
VIS    2025250     20200   21.6200  140.7000       9.1        84       946        98
VIS    2025250     20200   21.6200  140.6600       9.1        81       960        95
VIS    2025250     20200   21.6200  140.6400       9.1        79       957        95
VIS    2025250     20200   21.6200  140.6200       9.1        79       959        96
VIS    2025250     20200   21.6300  140.5900       9.0        83       947        98
VIS    2025250     20200   21.6300  140.5900       8.9        83       942        98
VIS    2025250     20200   21.6200  140.5600       9.0        85       942        98
VIS    2025250     20200   21.6300  140.5200       8.7        84       936        95
VIS    2025250     20200   21.6200  140.5000       8.8        82       937        96
VIS    2025250     20200   21.6300  140.4700       8.8        82       937        97
VIS    2025250     20200   21.6400  140.4400       8.8        83       938        99
VIS    2025250     20200   21.6400  140.4300       8.8        84       938        99
VIS    2025250     20200   21.6700  147.7800       5.0        90       911        92
VIS    2025250     20200   21.6400  146.4700       6.1        80       925        96
VIS    2025250     20200   21.6600  146.4600       6.0        94       930        95
VIS    2025250     20200   21.6500  146.4400       5.0        90       909        96
VIS    2025250     20200   21.6200  144.9900       7.1        85       986        94
VIS    2025250     20200   21.6200  144.9800       7.2        87       986        94
VIS    2025250     20200   21.6300  144.8300       8.4        83       925        94
VIS    2025250     20200   21.6200  144.8000       8.7        74       907        95
VIS    2025250     20200   21.6200  144.8000       8.7        74       907        96
VIS    2025250     20200   21.6300  144.7700       8.3        76       899        97
VIS    2025250     20200   21.6300  144.7500       8.4        80       898        99
VIS    2025250     20200   21.6200  144.7100       8.8        81       899        98
VIS    2025250     20200   21.6200  144.7000       8.9        80       899        97
VIS    2025250     20200   21.6300  144.6700       8.7        80       900        95
VIS    2025250     20200   21.6300  144.6300       8.3        83       899        97
VIS    2025250     20200   21.6300  144.6200       8.4        83       899        96
VIS    2025250     20200   21.6300  144.5800       8.8        82       899        97
VIS    2025250     20200   21.6200  144.5600       9.0        83       899        98
VIS    2025250     20200   21.6300  144.5500       9.2        86       899        98
VIS    2025250     20200   21.6200  144.5100       9.1        88       898        98
VIS    2025250     20200   21.6300  144.4900       9.1        88       898        98
VIS    2025250     20200   21.6300  144.4700       9.0        86       898        98
VIS    2025250     20200   21.6300  144.4300       9.2        85       898        97
VIS    2025250     20200   21.6400  144.4000       8.9        86       900        97
VIS    2025250     20200   21.6400  144.4000       8.8        85       900        97
VIS    2025250     20200   21.6200  144.3500       9.3        82       901        94
VIS    2025250     20200   21.6200  144.3300       9.2        81       902        96
VIS    2025250     20200   21.6200  144.3100       8.9        81       903        99
VIS    2025250     20200   21.6300  144.3000       8.8        82       903        99
VIS    2025250     20200   21.6100  144.2600       8.5        81       904        98
VIS    2025250     20200   21.6200  144.2500       8.7        82       904        99
VIS    2025250     20200   21.6300  144.2200       8.8        82       904        99
VIS    2025250     20200   21.6300  144.1800       8.5        82       904        98
VIS    2025250     20200   21.6200  144.1600       8.6        77       905        96
VIS    2025250     20200   21.6300  144.1500       8.6        79       905        96
VIS    2025250     20200   21.6200  144.1100       8.1        78       907        99
VIS    2025250     20200   21.6100  144.0900       8.3        77       907        98
VIS    2025250     20200   21.6100  144.0600       8.1        78       908        99
VIS    2025250     20200   21.6200  144.0400       8.3        81       910        99
VIS    2025250     20200   21.6100  144.0300       8.5        82       908        99
VIS    2025250     20200   21.6200  144.0000       9.0        82       905        99
VIS    2025250     20200   21.6200  143.9800       9.3        82       904        98
VIS    2025250     20200   21.6300  143.9400       9.4        82       905        98
VIS    2025250     20200   21.6300  143.9300       9.2        84       905        98
VIS    2025250     20200   21.6100  143.9000       8.5        88       905        98
VIS    2025250     20200   21.6100  143.8700       8.5        84       905        99
VIS    2025250     20200   21.6100  143.8500       8.7        82       906        97
VIS    2025250     20200   21.6300  143.8200       8.7        85       910        96
VIS    2025250     20200   21.6100  143.7800       9.0        87       912        91
VIS    2025250     20200   21.6200  143.7800       9.1        87       913        92
VIS    2025250     20200   21.6200  143.7500       9.0        91       914        91
VIS    2025250     20200   21.6300  143.7200       8.6        95       918        91
VIS    2025250     20200   21.6200  143.6700       9.1        92       950        91
VIS    2025250     20200   21.6100  143.6500       8.8        88       962        97
VIS    2025250     20200   21.6200  143.6100       9.3        81       988        97
VIS    2025250     20200   21.6200  143.5800      11.1        81       965        92
VIS    2025250     20200   21.6100  143.5600      10.4        81       951        98
VIS    2025250     20200   21.6100  143.5400      10.1        82       941        98
VIS    2025250     20200   21.6100  143.5200       9.9        86       934        98
VIS    2025250     20200   21.6100  143.4800       9.7        84       939        98
VIS    2025250     20200   21.6100  143.4600       9.6        83       948        99
VIS    2025250     20200   21.6000  142.9100       9.8        83       935        97
VIS    2025250     20200   21.6100  142.9000       9.7        85       935        97
VIS    2025250     20200   21.6200  142.8700       9.5        84       934       100
VIS    2025250     20200   21.6100  142.8400       9.6        82       931        98
VIS    2025250     20200   21.6200  142.8200      10.1        80       940        99
VIS    2025250     20200   21.6100  142.6200       9.8        88       965        95
VIS    2025250     20200   21.6100  142.6000       9.5        88       965        96
VIS    2025250     20200   21.6000  142.5700       9.5        77       928        95
VIS    2025250     20200   21.6200  142.5600       9.3        80       926        95
VIS    2025250     20200   21.6100  142.5200       9.6        78       927        93
VIS    2025250     20200   21.6100  142.5100       9.6        78       927        94
VIS    2025250     20200   21.6200  142.4900       9.4        78       928        97
VIS    2025250     20200   21.6000  142.4600       8.3        77       930        96
VIS    2025250     20200   21.6200  142.4000       9.4        85       955        97
VIS    2025250     20200   21.6100  142.3700       9.5        83       966        99
VIS    2025250     20200   21.6200  142.3600       9.5        81       957        99
VIS    2025250     20200   21.6100  142.2900       9.4        84       955        99
VIS    2025250     20200   21.6100  142.2600       9.1        83       938        99
VIS    2025250     20200   21.6200  142.2400       9.1        82       934        99
VIS    2025250     20200   21.6000  142.2200       9.5        79       931        95
VIS    2025250     20200   21.6200  142.1800       9.7        82       931        99
VIS    2025250     20200   21.6000  142.1500      10.1        79       924        98
VIS    2025250     20200   21.6000  142.1400      10.1        79       924        98
VIS    2025250     20200   21.6200  142.1100       9.9        81       923        99
VIS    2025250     20200   21.6000  142.0800      10.0        80       924        99
VIS    2025250     20200   21.6100  142.0500      10.5        77       931        99
VIS    2025250     20200   21.6200  142.0200      10.5        80       938       100
VIS    2025250     20200   21.6200  142.0200      10.4        81       938       100
VIS    2025250     20200   21.6200  141.9800       9.3        82       938        98
VIS    2025250     20200   21.6000  141.9500       9.5        82       948        99
VIS    2025250     20200   21.6000  141.9400       9.8        83       948        99
VIS    2025250     20200   21.6000  141.9200      10.3        84       964        99
VIS    2025250     20200   21.6000  141.8900       9.9        83       946        97
VIS    2025250     20200   21.6200  141.8500       9.7        87       946        96
VIS    2025250     20200   21.6200  141.8500       9.7        88       946        96
VIS    2025250     20200   21.6100  141.8000      10.0        84       940        99
VIS    2025250     20200   21.6000  141.7800       9.8        82       939        99
VIS    2025250     20200   21.6000  141.7700       9.7        82       939        99
VIS    2025250     20200   21.6000  141.7400       9.7        82       929       100
VIS    2025250     20200   21.6100  141.7200      10.2        83       958        99
VIS    2025250     20200   21.6000  141.7000       9.6        84       959        98
VIS    2025250     20200   21.6100  141.6500       9.4        85       973        93
VIS    2025250     20200   21.6000  141.6500       9.5        84       957        94
VIS    2025250     20200   21.6000  141.6200       9.8        81       957        94
VIS    2025250     20200   21.6100  141.5800       9.4        83       972        90
VIS    2025250     20200   21.6000  141.5600       9.3        83       951        91
VIS    2025250     20200   21.6000  141.5400       9.3        82       929        96
VIS    2025250     20200   21.6000  141.5300       9.3        82       925        96
VIS    2025250     20200   21.6100  141.4900       9.3        81       924        98
VIS    2025250     20200   21.6100  141.4600       9.3        80       924        99
VIS    2025250     20200   21.6100  141.4400       9.2        81       923        98
VIS    2025250     20200   21.6100  141.4100       9.2        83       923        96
VIS    2025250     20200   21.6200  141.3900       9.3        83       922        99
VIS    2025250     20200   21.6200  141.3600       9.2        83       926        99
VIS    2025250     20200   21.5900  141.3400       9.0        82       929        99
VIS    2025250     20200   21.6100  141.3300       9.0        83       929        99
VIS    2025250     20200   21.6000  141.2900       9.1        85       926        98
VIS    2025250     20200   21.6000  141.2600       9.2        83       926        98
VIS    2025250     20200   21.5900  141.2300       9.1        82       926        99
VIS    2025250     20200   21.5900  141.2100       8.8        81       926        99
VIS    2025250     20200   21.5900  141.2000       8.7        81       926        98
VIS    2025250     20200   21.6000  141.1700       8.4        83       926        97
VIS    2025250     20200   21.6000  141.1600       8.5        83       925        97
VIS    2025250     20200   21.5900  141.1200       8.7        81       926        97
VIS    2025250     20200   21.6000  141.1000       8.6        83       926        98
VIS    2025250     20200   21.5900  141.0800       8.6        85       927        96
VIS    2025250     20200   21.6000  141.0500       8.8        82       931        97
VIS    2025250     20200   21.6000  141.0300       8.8        81       931        98
VIS    2025250     20200   21.6100  141.0000       8.6        81       927        95
VIS    2025250     20200   21.6000  140.9600       8.6        79       929        98
VIS    2025250     20200   21.6100  140.9600       8.5        81       928        97
VIS    2025250     20200   21.6000  140.9300       8.5        80       931        95
VIS    2025250     20200   21.5900  140.9000       8.3        81       931        97
VIS    2025250     20200   21.6100  140.8800       8.6        84       928        98
VIS    2025250     20200   21.5900  140.8400       8.5        81       937        98
VIS    2025250     20200   21.6000  140.8300       8.6        82       935        98
VIS    2025250     20200   21.6100  140.8100       8.9        82       935        99
VIS    2025250     20200   21.6000  140.7800       8.9        84       942        98
VIS    2025250     20200   21.5900  140.7600       9.0        85       940        98
VIS    2025250     20200   21.5900  140.7200       9.1        83       944        98
VIS    2025250     20200   21.6100  140.7000       9.1        84       948        98
VIS    2025250     20200   21.6100  140.6700       8.9        82       959        95
VIS    2025250     20200   21.6100  140.6400       8.9        80       957        95
VIS    2025250     20200   21.5900  140.6300       8.9        81       944        96
VIS    2025250     20200   21.5900  140.6100       9.0        82       960        96
VIS    2025250     20200   21.5900  140.5700       9.3        83       957        98
VIS    2025250     20200   21.5900  140.5500       9.2        84       960        97
VIS    2025250     20200   21.5900  140.5400       9.1        82       960        99
VIS    2025250     20200   21.6100  140.5000       9.0        81       943        97
VIS    2025250     20200   21.6100  140.4900       9.0        81       940        98
VIS    2025250     20200   21.6100  146.4800       6.6        62       941        92
VIS    2025250     20200   21.6300  146.4800       6.3        71       925        93
VIS    2025250     20200   21.6200  146.4500       5.1        76       909        98
VIS    2025250     20200   21.6000  145.0900       7.3        90       986        93
VIS    2025250     20200   21.6000  145.0800       6.7        91       986        92
VIS    2025250     20200   21.6000  144.9900       6.9        81       979        94
VIS    2025250     20200   21.6000  144.9900       6.8        81       979        95
VIS    2025250     20200   21.6000  144.9500       6.9        85       952        98
VIS    2025250     20200   21.5900  144.9200       8.0        89       959        91
VIS    2025250     20200   21.5900  144.8900       8.6        89       925        92
VIS    2025250     20200   21.6000  144.8500       8.3        83       920        92
VIS    2025250     20200   21.6100  144.8400       8.3        82       920        93
VIS    2025250     20200   21.6000  144.8100       8.6        74       904        95
VIS    2025250     20200   21.6100  144.7900       8.7        75       902        97
VIS    2025250     20200   21.6000  144.7700       8.5        81       897        96
VIS    2025250     20200   21.6100  144.7400       8.4        84       897        99
VIS    2025250     20200   21.6000  144.7100       9.2        82       899        97
VIS    2025250     20200   21.5900  144.6800       9.0        78       899        97
VIS    2025250     20200   21.5900  144.6500       8.3        78       900        98
VIS    2025250     20200   21.6100  144.6300       8.2        84       899       100
VIS    2025250     20200   21.6000  144.6200       8.4        83       899       100
VIS    2025250     20200   21.6100  144.5700       8.9        81       899        98
VIS    2025250     20200   21.6100  144.5700       8.9        82       899        98
VIS    2025250     20200   21.6000  144.5400       9.2        89       899        98
VIS    2025250     20200   21.6100  144.5100       9.2        91       898        97
VIS    2025250     20200   21.5900  144.4700       9.5        92       899        96
VIS    2025250     20200   21.6000  144.4700       9.2        90       898        97
VIS    2025250     20200   21.5900  144.4300       9.2        90       898        95
VIS    2025250     20200   21.6100  144.4000       9.1        88       900        96
VIS    2025250     20200   21.6100  144.3700       9.0        85       900        96
VIS    2025250     20200   21.6100  144.3700       9.1        83       900        96
VIS    2025250     20200   21.6100  144.3300       9.2        80       902        97
VIS    2025250     20200   21.6000  144.3200       9.1        79       902        98
VIS    2025250     20200   21.5900  144.2900       8.6        80       903        99
VIS    2025250     20200   21.5900  144.2500       8.4        84       905        98
VIS    2025250     20200   21.5900  144.2400       8.4        85       905        97
VIS    2025250     20200   21.6100  144.2100       9.2        85       904        97
VIS    2025250     20200   21.5900  144.1700       8.3        77       906        99
VIS    2025250     20200   21.5900  144.1700       8.3        77       906        99
VIS    2025250     20200   21.5900  144.1200       8.3        78       906        99
VIS    2025250     20200   21.6000  144.1000       8.4        77       906        98
VIS    2025250     20200   21.6000  144.0700       8.1        77       907        98
VIS    2025250     20200   21.6000  144.0500       8.0        81       908        99
VIS    2025250     20200   21.6000  144.0200       8.3        83       908        99
VIS    2025250     20200   21.6100  144.0200       8.5        83       908        99
VIS    2025250     20200   21.6000  143.9900       8.7        85       904        99
VIS    2025250     20200   21.6000  143.9600       9.4        84       904        98
VIS    2025250     20200   21.5900  143.9400       9.4        83       904        97
VIS    2025250     20200   21.5900  143.9100       9.4        80       905        94
VIS    2025250     20200   21.5900  143.8800       8.9        83       905        99
VIS    2025250     20200   21.5900  143.8600       8.6        81       906        99
VIS    2025250     20200   21.6000  143.8400       8.5        81       908        93
VIS    2025250     20200   21.5900  143.8000       8.8        88       910        94
VIS    2025250     20200   21.5900  143.7900       9.0        89       911        93
VIS    2025250     20200   21.6000  143.6800       8.8        91       922        95
VIS    2025250     20200   21.6000  143.6600       8.8        90       931        98
VIS    2025250     20200   21.5900  143.6300       9.2        85       962        97
VIS    2025250     20200   21.5800  143.6200       9.3        84       976        97
VIS    2025250     20200   21.6000  143.5800      10.0        80       965        99
VIS    2025250     20200   21.6000  143.5700      10.0        80       965        99
VIS    2025250     20200   21.6000  143.5400       9.9        82       937        98
VIS    2025250     20200   21.6000  143.5100       9.8        86       934        98
VIS    2025250     20200   21.6000  143.5000       9.9        85       936        99
VIS    2025250     20200   21.5800  142.9000       9.9        80       947        98
VIS    2025250     20200   21.5800  142.9000       9.7        81       947        97
VIS    2025250     20200   21.5800  142.8600       9.0        85       934        98
VIS    2025250     20200   21.5900  142.6500      10.6        77       990        98
VIS    2025250     20200   21.5900  142.6200      10.2        82       965        98
VIS    2025250     20200   21.5800  142.6100      10.5        77       964        99
VIS    2025250     20200   21.5800  142.5900      10.2        78       944        99
VIS    2025250     20200   21.5800  142.5500       9.3        78       929        97
VIS    2025250     20200   21.5800  142.5300       9.7        77       931        98
VIS    2025250     20200   21.5800  142.5100       9.5        76       939        99
VIS    2025250     20200   21.5900  142.4900       9.1        77       930        98
VIS    2025250     20200   21.6000  142.4600       8.1        77       930        95
VIS    2025250     20200   21.5800  142.4200       8.9        80       958        98
VIS    2025250     20200   21.5800  142.3800       9.5        81       983        99
VIS    2025250     20200   21.5900  142.3500       9.2        80       950        97
VIS    2025250     20200   21.6000  142.2800       9.4        85       968        99
VIS    2025250     20200   21.5800  142.2600       9.4        83       968        99
VIS    2025250     20200   21.5900  142.2300       9.4        79       934        95
VIS    2025250     20200   21.5900  142.2100       9.8        79       931        95
VIS    2025250     20200   21.5800  142.1800      10.0        81       926        99
VIS    2025250     20200   21.5800  142.1700      10.1        81       925        99
VIS    2025250     20200   21.5700  142.1400      10.1        80       925        99
VIS    2025250     20200   21.5800  142.1000       9.5        81       924        99
VIS    2025250     20200   21.5900  142.0800       9.7        81       924        99
VIS    2025250     20200   21.5900  142.0500      10.3        78       931        99
VIS    2025250     20200   21.5800  142.0500       9.9        80       931        99
VIS    2025250     20200   21.5700  142.0100       9.8        85       960        95
VIS    2025250     20200   21.5800  142.0000       9.8        83       952        96
VIS    2025250     20200   21.5900  141.9500       9.7        80       948       100
VIS    2025250     20200   21.5700  141.9400      10.1        81       937       100
VIS    2025250     20200   21.5900  141.9100      10.2        83       946        99
VIS    2025250     20200   21.5900  141.9000      10.1        83       946        98
VIS    2025250     20200   21.5800  141.8700       9.5        84       935        98
VIS    2025250     20200   21.5700  141.8300       9.2        85       927        99
VIS    2025250     20200   21.5800  141.8300       9.2        85       927        99
VIS    2025250     20200   21.5900  141.7800       9.7        81       929        99
VIS    2025250     20200   21.5900  141.7600       9.7        81       928        99
VIS    2025250     20200   21.5900  141.7400       9.7        82       927       100
VIS    2025250     20200   21.5900  141.7100       9.7        83       934        99
VIS    2025250     20200   21.5900  141.6800       9.2        84       951        98
VIS    2025250     20200   21.5900  141.6600       9.1        85       951        95
VIS    2025250     20200   21.5700  141.6300       9.5        81       930        97
VIS    2025250     20200   21.5700  141.6300       9.5        81       933        97
VIS    2025250     20200   21.5700  141.6000       9.5        81       955        94
VIS    2025250     20200   21.5900  141.5600       9.2        82       951        92
VIS    2025250     20200   21.5900  141.5400       9.4        81       929        96
VIS    2025250     20200   21.5900  141.5200       9.4        80       925        97
VIS    2025250     20200   21.5800  141.5100       9.3        79       925        98
VIS    2025250     20200   21.5700  141.4800       8.9        80       926        98
VIS    2025250     20200   21.5900  141.4500       9.1        82       924        98
VIS    2025250     20200   21.5800  141.4300       9.0        83       924        96
VIS    2025250     20200   21.5700  141.3900       9.1        82       926        98
VIS    2025250     20200   21.5700  141.3800       9.1        82       926        98
VIS    2025250     20200   21.5800  141.3600       8.9        81       927        97
VIS    2025250     20200   21.5800  141.3200       9.3        80       930        99
VIS    2025250     20200   21.5800  141.2900       9.1        81       928        98
VIS    2025250     20200   21.5700  141.2600       9.0        81       928        98
VIS    2025250     20200   21.5800  141.2400       9.1        81       927       100
VIS    2025250     20200   21.5900  141.2100       8.8        81       926        99
VIS    2025250     20200   21.5800  141.2100       8.8        80       926        99
VIS    2025250     20200   21.5900  141.1700       8.4        82       926        98
VIS    2025250     20200   21.5800  141.1600       8.7        80       926        98
VIS    2025250     20200   21.5900  141.1200       8.7        81       926        96
VIS    2025250     20200   21.5800  141.1100       8.7        82       926        97
VIS    2025250     20200   21.5800  141.0700       8.6        86       931        96
VIS    2025250     20200   21.5900  141.0500       8.8        82       931        94
VIS    2025250     20200   21.5700  141.0300       8.7        81       964        97
VIS    2025250     20200   21.5700  141.0100       8.4        83       949        98
VIS    2025250     20200   21.5900  140.9800       8.7        81       934        99
VIS    2025250     20200   21.5700  140.9500       8.7        78       935        96
VIS    2025250     20200   21.5700  140.9200       8.3        80       934        93
VIS    2025250     20200   21.5800  140.9100       8.2        80       931        94
VIS    2025250     20200   21.5900  140.8800       8.4        81       931        99
VIS    2025250     20200   21.5900  140.8600       8.5        80       931        99
VIS    2025250     20200   21.5900  140.8400       8.6        80       939        98
VIS    2025250     20200   21.5700  140.7700       8.9        83       966        98
VIS    2025250     20200   21.5700  140.7500       9.1        83       946        99
VIS    2025250     20200   21.5700  140.7400       9.2        82       944        99
VIS    2025250     20200   21.5900  140.7100       9.1        83       944        97
VIS    2025250     20200   21.5900  140.6800       8.9        81       946        94
VIS    2025250     20200   21.5700  140.6500       9.0        81       939        99
VIS    2025250     20200   21.5700  140.6300       9.1        81       939        99
VIS    2025250     20200   21.5700  140.6100       9.0        81       957        99
VIS    2025250     20200   21.5900  140.5800       9.1        83       957        98
VIS    2025250     20200   21.5700  140.5500       8.9        81       957        99
VIS    2025250     20200   21.5700  140.5400       9.1        80       960        99
VIS    2025250     20200   21.5900  140.5100       9.3        79       962        99
VIS    2025250     20200   21.5900  140.5000       9.4        79       958        99
VIS    2025250     20200   21.6300  149.5800       5.2        71       928        91
VIS    2025250     20200   21.6300  149.5800       5.0        71       892        90
VIS    2025250     20200   21.6200  149.4500       4.5        81       943        98
VIS    2025250     20200   21.6000  148.0200       5.3        84       973        92
VIS    2025250     20200   21.6000  148.0100       5.3        84       973        90
VIS    2025250     20200   21.6000  146.4800       6.1        66       934        93
VIS    2025250     20200   21.6000  146.4700       5.7        68       915        93
VIS    2025250     20200   21.5700  145.1400       8.7        94       984        92
VIS    2025250     20200   21.5800  145.1100       7.9        91       954        96
VIS    2025250     20200   21.5900  145.1000       7.7        90       954        96
VIS    2025250     20200   21.5900  145.0000       7.0        81       970        93
VIS    2025250     20200   21.5900  144.9600       6.9        84       940        97
VIS    2025250     20200   21.5700  144.9400       7.8        88       933        95
VIS    2025250     20200   21.5700  144.9100       8.5        89       922        96
VIS    2025250     20200   21.5900  144.8900       8.6        89       921        95
VIS    2025250     20200   21.5700  144.8700       8.5        86       905        98
VIS    2025250     20200   21.5700  144.8500       8.5        84       904        97
VIS    2025250     20200   21.5800  144.8200       8.6        76       902        96
VIS    2025250     20200   21.5700  144.7800       8.5        84       899        97
VIS    2025250     20200   21.5700  144.7800       8.4        85       898        97
VIS    2025250     20200   21.5900  144.7500       8.2        84       896        95
VIS    2025250     20200   21.5700  144.7100       9.2        83       898        97
VIS    2025250     20200   21.5800  144.6800       9.1        80       899        97
VIS    2025250     20200   21.5800  144.6800       8.9        79       899        98
VIS    2025250     20200   21.5800  144.6500       8.4        79       899        99
VIS    2025250     20200   21.5700  144.6300       8.6        82       899        99
VIS    2025250     20200   21.5700  144.6000       8.8        80       900        98
VIS    2025250     20200   21.5800  144.5600       8.5        83       899        99
VIS    2025250     20200   21.5800  144.5400       9.1        89       899        97
VIS    2025250     20200   21.5700  144.5100      10.0        94       899        94
VIS    2025250     20200   21.5700  144.4800      10.1        96       900        94
VIS    2025250     20200   21.5800  144.4700       9.6        93       899        96
VIS    2025250     20200   21.5800  144.4500       9.4        91       898        96
VIS    2025250     20200   21.5700  144.4100       9.2        91       899        92
VIS    2025250     20200   21.5900  144.4000       9.2        90       899        92
VIS    2025250     20200   21.5700  144.3600       8.9        83       903        96
VIS    2025250     20200   21.5600  144.3500       9.0        80       903        97
VIS    2025250     20200   21.5800  144.3300       9.2        79       903        97
VIS    2025250     20200   21.5800  144.3100       9.0        80       902        97
VIS    2025250     20200   21.5600  144.2600       8.4        84       904        92
VIS    2025250     20200   21.5800  144.2400       8.3        85       905        96
VIS    2025250     20200   21.5700  144.2200       8.5        82       905        98
VIS    2025250     20200   21.5600  144.1900       8.5        80       905        99
VIS    2025250     20200   21.5800  144.1700       8.2        77       906        99
VIS    2025250     20200   21.5800  144.1600       8.1        80       906        99
VIS    2025250     20200   21.5800  144.1200       8.3        79       906        99
VIS    2025250     20200   21.5700  144.0900       8.1        77       905        98
VIS    2025250     20200   21.5800  144.0700       7.8        77       906        97
VIS    2025250     20200   21.5800  144.0500       7.6        81       906       100
VIS    2025250     20200   21.5800  144.0200       8.1        85       904       100
VIS    2025250     20200   21.5600  144.0000       8.2        91       904        99
VIS    2025250     20200   21.5800  143.9800       8.3        93       903        98
VIS    2025250     20200   21.5800  143.9500       9.0        86       904        98
VIS    2025250     20200   21.5700  143.9200       8.9        84       904        99
VIS    2025250     20200   21.5600  143.9000       9.0        81       905        99
VIS    2025250     20200   21.5800  143.8800       8.9        80       906        98
VIS    2025250     20200   21.5700  143.8400       8.5        81       907        97
VIS    2025250     20200   21.5600  143.8200       8.5        87       908        97
VIS    2025250     20200   21.5800  143.8000       8.7        87       910        95
VIS    2025250     20200   21.5800  143.7800       8.8        90       909        97
VIS    2025250     20200   21.5600  143.7400       9.2        89       910        93
VIS    2025250     20200   21.5800  143.7200       9.2        90       911        91
VIS    2025250     20200   21.5800  143.7100       9.1        90       912        94
VIS    2025250     20200   21.5700  143.6700       8.8        88       913       100
VIS    2025250     20200   21.5600  143.6400       8.9        85       915        99
VIS    2025250     20200   21.5700  143.6200       9.2        85       960        98
VIS    2025250     20200   21.5600  143.6100       9.0        86       946        99
VIS    2025250     20200   21.5600  143.5700       9.8        83       963        96
VIS    2025250     20200   21.5600  143.5600      10.0        82       960        97
VIS    2025250     20200   21.5600  143.5300       9.8        80       936        97
VIS    2025250     20200   21.5700  143.5000       9.6        81       936       100
VIS    2025250     20200   21.5500  142.9200      10.0        81       982       100
VIS    2025250     20200   21.5700  142.9000       9.7        80       947        97
VIS    2025250     20200   21.5700  142.8800       9.3        83       947        97
VIS    2025250     20200   21.5600  142.8400       8.9        84       963        97
VIS    2025250     20200   21.5700  142.6500      10.6        75       990        98
VIS    2025250     20200   21.5600  142.6100      10.6        76       965        99
VIS    2025250     20200   21.5700  142.6000      10.4        77       946        99
VIS    2025250     20200   21.5600  142.5700       9.6        79       944        99
VIS    2025250     20200   21.5700  142.5500       9.2        78       929        98
VIS    2025250     20200   21.5700  142.5300       9.8        76       932        98
VIS    2025250     20200   21.5700  142.5100       9.5        76       939        99
VIS    2025250     20200   21.5700  142.4800       8.5        74       939        97
VIS    2025250     20200   21.5600  142.4600       8.4        75       958        96
VIS    2025250     20200   21.5700  142.4200       9.1        80       968        98
VIS    2025250     20200   21.5500  142.3900       9.6        82       966        97
VIS    2025250     20200   21.5700  142.3800       9.6        80       983        98
VIS    2025250     20200   21.5700  142.2600       9.7        84       973        99
VIS    2025250     20200   21.5600  142.2400      10.0        83       944        97
VIS    2025250     20200   21.5600  142.2200      10.1        82       931        95
VIS    2025250     20200   21.5700  142.2100      10.1        81       930        95
VIS    2025250     20200   21.5500  142.1800      10.2        82       927        98
VIS    2025250     20200   21.5600  142.1500      10.1        81       925        99
VIS    2025250     20200   21.5500  142.1200       9.7        82       924        99
VIS    2025250     20200   21.5700  142.1100       9.6        81       924        99
VIS    2025250     20200   21.5500  142.0700       9.3        86       927        96
VIS    2025250     20200   21.5500  142.0600       9.2        86       962        95
VIS    2025250     20200   21.5500  142.0200       9.6        88       947        97
VIS    2025250     20200   21.5700  142.0100       9.7        87       964        93
VIS    2025250     20200   21.5700  141.9700       9.7        80       937        99
VIS    2025250     20200   21.5700  141.9400      10.1        80       928        99
VIS    2025250     20200   21.5500  141.9400      10.1        80       926        99
VIS    2025250     20200   21.5500  141.9100       9.9        83       926       100
VIS    2025250     20200   21.5500  141.8700       9.8        81       925        99
VIS    2025250     20200   21.5500  141.8600       9.8        79       925        98
VIS    2025250     20200   21.5700  141.8300       9.3        84       926        98
VIS    2025250     20200   21.5600  141.8100       9.1        84       926        98
VIS    2025250     20200   21.5500  141.7900       9.3        83       925        97
VIS    2025250     20200   21.5700  141.7600       9.6        81       925        99
VIS    2025250     20200   21.5700  141.7300       9.5        82       923        99
VIS    2025250     20200   21.5600  141.7000       9.2        83       924        99
VIS    2025250     20200   21.5700  141.6800       9.2        83       926        99
VIS    2025250     20200   21.5700  141.6500       9.3        82       927        99
VIS    2025250     20200   21.5700  141.6300       9.5        81       933        98
VIS    2025250     20200   21.5500  141.6000       9.3        81       949        98
VIS    2025250     20200   21.5500  141.5700       9.1        81       951        99
VIS    2025250     20200   21.5600  141.5500       9.3        81       947        99
VIS    2025250     20200   21.5600  141.5400       9.4        80       937        99
VIS    2025250     20200   21.5600  141.5100       9.4        79       927        98
VIS    2025250     20200   21.5500  141.4900       9.3        79       927        99
VIS    2025250     20200   21.5600  141.4500       8.8        81       926        98
VIS    2025250     20200   21.5600  141.4400       8.8        82       926        97
VIS    2025250     20200   21.5500  141.4200       9.1        83       930        98
VIS    2025250     20200   21.5600  141.3800       9.1        82       927        98
VIS    2025250     20200   21.5600  141.3700       9.0        81       927        98
VIS    2025250     20200   21.5500  141.3300       9.5        79       933        98
VIS    2025250     20200   21.5600  141.3200       9.4        80       932        99
VIS    2025250     20200   21.5600  141.3000       9.4        79       930        98
VIS    2025250     20200   21.5600  141.2700       9.1        80       928        97
VIS    2025250     20200   21.5600  141.2500       9.0        80       928        99
VIS    2025250     20200   21.5500  141.2000       8.8        74       929        97
VIS    2025250     20200   21.5500  141.1900       8.8        74       929        97
VIS    2025250     20200   21.5500  141.1500       9.0        75       929        97
VIS    2025250     20200   21.5500  141.1300       8.6        75       929        97
VIS    2025250     20200   21.5600  141.1100       8.1        79       930        98
VIS    2025250     20200   21.5600  141.0400       8.6        82       964        97
VIS    2025250     20200   21.5400  140.9600       8.6        79       953        97
VIS    2025250     20200   21.5600  140.9500       8.7        79       936        96
VIS    2025250     20200   21.5600  140.9200       8.3        80       934        94
VIS    2025250     20200   21.5500  140.9000       8.3        79       941        97
VIS    2025250     20200   21.5600  140.8600       8.7        80       937        98
VIS    2025250     20200   21.5400  140.8100       9.3        76       975        99
VIS    2025250     20200   21.5500  140.8000       9.0        76       975        99
VIS    2025250     20200   21.5400  140.7600       8.9        81       966        97
VIS    2025250     20200   21.5400  140.7600       9.0        81       960        97
VIS    2025250     20200   21.5600  140.7300       9.2        82       944        98
VIS    2025250     20200   21.5400  140.7000       9.0        82       944        97
VIS    2025250     20200   21.5500  140.6600       9.0        82       937        99
VIS    2025250     20200   21.5600  140.6600       9.0        81       939        99
VIS    2025250     20200   21.5600  140.6300       9.1        81       939       100
VIS    2025250     20200   21.5600  140.6100       9.1        80       939        99
VIS    2025250     20200   21.5600  140.5400       8.9        81       960        99
VIS    2025250     20200   21.5600  140.5300       9.0        80       960        99
VIS    2025250     20200   21.6200  149.5800       4.7        71       909        90
VIS    2025250     20200   21.6200  149.4400       4.7        83       943        97
VIS    2025250     20200   21.6000  148.0200       5.2        86       973        93
VIS    2025250     20200   21.5700  146.4800       6.1        82       920       100
VIS    2025250     20200   21.5700  146.4800       5.8        78       920        98
VIS    2025250     20200   21.5500  145.1500       8.9        92       945        95
VIS    2025250     20200   21.5700  145.1400       8.8        94       984        92
VIS    2025250     20200   21.5700  145.1100       7.9        89       954        97
VIS    2025250     20200   21.5500  145.0800       7.6        92       949        97
VIS    2025250     20200   21.5500  145.0500       6.7        96       926        93
VIS    2025250     20200   21.5600  145.0100       6.9        87       939        91
VIS    2025250     20200   21.5400  144.9800       7.8        90       924        97
VIS    2025250     20200   21.5500  144.9700       7.8        89       925        97
VIS    2025250     20200   21.5400  144.9300       8.8        88       923        95
VIS    2025250     20200   21.5400  144.9200       8.5        86       916        97
VIS    2025250     20200   21.5600  144.8900       8.5        87       905        98
VIS    2025250     20200   21.5600  144.8500       8.4        83       903        98
VIS    2025250     20200   21.5600  144.8400       8.6        81       899        98
VIS    2025250     20200   21.5500  144.8200       8.8        84       898        97
VIS    2025250     20200   21.5600  144.7800       8.4        85       898        97
VIS    2025250     20200   21.5600  144.7700       8.3        85       897        97
VIS    2025250     20200   21.5400  144.7400       8.6        84       897        99
VIS    2025250     20200   21.5500  144.7200       8.8        84       898        99
VIS    2025250     20200   21.5600  144.6800       8.8        81       899        98
VIS    2025250     20200   21.5600  144.6700       8.5        81       899        99
VIS    2025250     20200   21.5600  144.6300       8.6        81       899        99
VIS    2025250     20200   21.5500  144.6100       9.0        81       900        98
VIS    2025250     20200   21.5600  144.5800       8.7        81       900        97
VIS    2025250     20200   21.5500  144.5500       8.7        86       899        91
VIS    2025250     20200   21.5500  144.5500       8.7        87       899        92
VIS    2025250     20200   21.5500  144.5100       9.8        88       900        95
VIS    2025250     20200   21.5400  144.4900       9.8        87       900        96
VIS    2025250     20200   21.5400  144.4600       9.0        89       899        97
VIS    2025250     20200   21.5500  144.4300       8.8        90       898        97
VIS    2025250     20200   21.5500  144.4200       9.0        91       898        95
VIS    2025250     20200   21.5400  144.3800       9.0        87       900        92
VIS    2025250     20200   21.5400  144.3700       9.0        85       902        96
VIS    2025250     20200   21.5600  144.3500       9.0        81       903        96
VIS    2025250     20200   21.5500  144.3000       8.9        84       902        94
VIS    2025250     20200   21.5400  144.2900       8.5        84       903        92
VIS    2025250     20200   21.5400  144.2700       8.5        83       903        94
VIS    2025250     20200   21.5600  144.2500       8.3        82       905        98
VIS    2025250     20200   21.5600  144.2100       8.6        80       905        99
VIS    2025250     20200   21.5400  144.1800       8.6        81       904        99
VIS    2025250     20200   21.5600  144.1600       8.3        84       905        99
VIS    2025250     20200   21.5600  144.1500       8.2        84       906        99
VIS    2025250     20200   21.5500  144.1100       8.3        81       905       100
VIS    2025250     20200   21.5400  144.0800       7.7        82       904        98
VIS    2025250     20200   21.5500  144.0600       7.5        82       904        97
VIS    2025250     20200   21.5500  144.0300       8.0        85       904        99
VIS    2025250     20200   21.5500  144.0100       8.2        90       904        99
VIS    2025250     20200   21.5600  144.0000       8.3        90       904        99
VIS    2025250     20200   21.5500  143.9600       8.2        89       904        97
VIS    2025250     20200   21.5400  143.9300       8.1        84       905        99
VIS    2025250     20200   21.5600  143.9100       8.8        82       904        99
VIS    2025250     20200   21.5600  143.9000       9.0        81       905        99
VIS    2025250     20200   21.5400  143.8700       9.0        81       906        98
VIS    2025250     20200   21.5300  143.8500       8.8        86       907        98
VIS    2025250     20200   21.5600  143.8200       8.5        88       909        97
VIS    2025250     20200   21.5400  143.8000       8.7        93       907        97
VIS    2025250     20200   21.5400  143.7700       8.8        90       906        98
VIS    2025250     20200   21.5500  143.7300       9.2        88       910        95
VIS    2025250     20200   21.5500  143.7200       9.0        87       910        98
VIS    2025250     20200   21.5500  143.7000       8.9        85       911       100
VIS    2025250     20200   21.5500  143.6700       8.9        85       913       100
VIS    2025250     20200   21.5500  143.6500       8.9        85       913        99
VIS    2025250     20200   21.5500  143.6100       8.9        87       927        99
VIS    2025250     20200   21.5500  143.5900       9.2        88       963        97
VIS    2025250     20200   21.5500  143.5600      10.0        82       963        97
VIS    2025250     20200   21.5500  143.5600      10.1        82       960        97
VIS    2025250     20200   21.5300  143.5200       9.6        80       942        98
VIS    2025250     20200   21.5500  143.5100       9.3        81       937        99
VIS    2025250     20200   21.5300  143.4700      10.0        87       954        95
VIS    2025250     20200   21.5300  143.0900       8.7        75       974        97
VIS    2025250     20200   21.5300  143.0700      10.2        77       974        99
VIS    2025250     20200   21.5300  143.0600      10.6        79       974        98
VIS    2025250     20200   21.5300  142.9800      10.6        83       973        99
VIS    2025250     20200   21.5300  142.9200       9.6        85       978        99
VIS    2025250     20200   21.5300  142.9100       9.6        86       978        99
VIS    2025250     20200   21.5400  142.8900       9.2        86       964        99
VIS    2025250     20200   21.5300  142.8600       9.2        86       962        98
VIS    2025250     20200   21.5300  142.8400       9.5        85       957        99
VIS    2025250     20200   21.5300  142.6300      10.5        83       980        96
VIS    2025250     20200   21.5300  142.6300      10.5        81       980        96
VIS    2025250     20200   21.5500  142.5900      10.4        79       960        99
VIS    2025250     20200   21.5400  142.5600       9.7        82       946        99
VIS    2025250     20200   21.5500  142.5500       9.3        80       944        99
VIS    2025250     20200   21.5400  142.5200       9.5        79       946       100
VIS    2025250     20200   21.5300  142.5100       9.6        81       956        99
VIS    2025250     20200   21.5300  142.4800      10.0        83       956        97
VIS    2025250     20200   21.5300  142.4400      10.3        82       950        96
VIS    2025250     20200   21.5200  142.4200      10.1        81       950        95
VIS    2025250     20200   21.5300  142.4000       9.7        81       955        95
VIS    2025250     20200   21.5300  142.3800       9.4        84       966        95
VIS    2025250     20200   21.5200  142.3100       8.6        80       965        97
VIS    2025250     20200   21.5400  142.2600      10.4        81       973        94
VIS    2025250     20200   21.5300  142.2500      10.4        85       947        96
VIS    2025250     20200   21.5400  142.2300      10.5        85       934        97
VIS    2025250     20200   21.5200  142.2000      10.2        82       928        98
VIS    2025250     20200   21.5300  142.1700      10.0        81       927        98
VIS    2025250     20200   21.5400  142.1500      10.0        82       926        99
VIS    2025250     20200   21.5300  142.1300       9.8        82       926        99
VIS    2025250     20200   21.5200  142.1100      10.0        84       924        98
VIS    2025250     20200   21.5200  142.0800       9.9        84       932        99
VIS    2025250     20200   21.5400  142.0600       9.1        86       962        94
VIS    2025250     20200   21.5400  142.0200       9.4        87       947        98
VIS    2025250     20200   21.5400  141.9900       9.9        82       930        99
VIS    2025250     20200   21.5400  141.9800      10.0        81       928        98
VIS    2025250     20200   21.5400  141.9600       9.9        77       926        97
VIS    2025250     20200   21.5400  141.9300      10.0        81       926        99
VIS    2025250     20200   21.5400  141.8900       9.6        83       925        99
VIS    2025250     20200   21.5200  141.8700       9.7        80       925        98
VIS    2025250     20200   21.5400  141.8600       9.8        79       925        99
VIS    2025250     20200   21.5300  141.8300       9.7        81       925        99
VIS    2025250     20200   21.5400  141.8000       9.3        85       925       100
VIS    2025250     20200   21.5200  141.7900       9.4        86       925       100
VIS    2025250     20200   21.5300  141.7400       9.5        81       924        98
VIS    2025250     20200   21.5400  141.7300       9.4        82       924        98
VIS    2025250     20200   21.5300  141.7000       9.1        81       925        98
VIS    2025250     20200   21.5300  141.6700       9.2        79       925        96
VIS    2025250     20200   21.5300  141.6500       9.0        80       927        97
VIS    2025250     20200   21.5200  141.6400       8.9        80       927        97
VIS    2025250     20200   21.5400  141.6000       9.3        80       940        99
VIS    2025250     20200   21.5300  141.5900       9.2        80       940        99
VIS    2025250     20200   21.5400  141.5500       9.2        78       950        99
VIS    2025250     20200   21.5400  141.5400       9.3        78       947        99
VIS    2025250     20200   21.5300  141.5000       9.7        78       930        98
VIS    2025250     20200   21.5300  141.4900       9.6        78       930        98
VIS    2025250     20200   21.5200  141.4500       9.1        79       937        95
VIS    2025250     20200   21.5200  141.4400       9.2        79       937        95
VIS    2025250     20200   21.5200  141.4100       9.3        79       936        96
VIS    2025250     20200   21.5200  141.3800       9.2        80       933        97
VIS    2025250     20200   21.5200  141.3600       9.4        79       933        98
VIS    2025250     20200   21.5200  141.3400       9.6        78       933        96
VIS    2025250     20200   21.5200  141.3000       9.4        80       934        97
VIS    2025250     20200   21.5200  141.2900       9.3        80       934        97
VIS    2025250     20200   21.5200  141.2600       9.3        78       932        96
VIS    2025250     20200   21.5200  141.2400       9.4        76       933        97
VIS    2025250     20200   21.5200  141.2100       9.3        75       935        96
VIS    2025250     20200   21.5300  141.1900       9.1        74       932        94
VIS    2025250     20200   21.5400  141.1700       9.1        75       931        97
VIS    2025250     20200   21.5200  141.1500       9.1        76       932        99
VIS    2025250     20200   21.5300  140.9700       8.5        80       953        97
VIS    2025250     20200   21.5400  140.9500       8.5        79       953        98
VIS    2025250     20200   21.5400  140.9200       8.3        80       942        98
VIS    2025250     20200   21.5400  140.8100       9.6        77       975        99
VIS    2025250     20200   21.5400  140.7900       9.1        78       975        98
VIS    2025250     20200   21.5200  140.7700       9.1        79       966        95
VIS    2025250     20200   21.5300  140.7400       9.1        81       955        98
VIS    2025250     20200   21.5200  140.7300       9.1        81       949        98
VIS    2025250     20200   21.5300  140.7000       9.1        81       948        98
VIS    2025250     20200   21.5200  140.6800       9.3        82       932        99
VIS    2025250     20200   21.5400  140.6600       9.3        81       936       100
VIS    2025250     20200   21.5400  140.6300       9.4        80       939       100
VIS    2025250     20200   21.5300  140.6000       9.1        79       946        99
VIS    2025250     20200   21.5300  140.5800       8.6        79       948        97
VIS    2025250     20200   21.5300  140.5400       8.4        81       960        97
VIS    2025250     20200   21.5400  140.5000       9.2        80       971        95
VIS    2025250     20200   21.5900  149.5800       4.1        69       909        99
VIS    2025250     20200   21.5600  148.0100       4.4        78       978        92
VIS    2025250     20200   21.5700  147.9900       4.5        82       978       100
VIS    2025250     20200   21.5500  147.7300       6.6        90       984        93
VIS    2025250     20200   21.5500  147.7100       6.3        89       965        95
VIS    2025250     20200   21.5500  146.4900       6.6        91       925        95
VIS    2025250     20200   21.5500  146.4600       5.7        85       920        98
VIS    2025250     20200   21.5400  145.1500       8.9        92       928        96
VIS    2025250     20200   21.5200  145.1200       7.9        81       926        99
VIS    2025250     20200   21.5400  145.1100       8.0        86       928        99
VIS    2025250     20200   21.5300  145.0800       8.2        90       927        98
VIS    2025250     20200   21.5400  145.0500       7.1        91       926        98
VIS    2025250     20200   21.5200  145.0200       7.9        76       916        97
VIS    2025250     20200   21.5300  145.0100       7.8        79       921        97
VIS    2025250     20200   21.5400  144.9900       7.8        89       924        98
VIS    2025250     20200   21.5200  144.9400       8.8        89       918        95
VIS    2025250     20200   21.5200  144.9400       8.8        87       910        95
VIS    2025250     20200   21.5400  144.9200       8.6        86       916        98
VIS    2025250     20200   21.5200  144.8700       8.0        83       899        96
VIS    2025250     20200   21.5200  144.8500       8.1        83       899        98
VIS    2025250     20200   21.5200  144.8200       8.6        83       898        95
VIS    2025250     20200   21.5200  144.8000       8.7        82       898        94
VIS    2025250     20200   21.5300  144.7800       8.5        86       898        97
VIS    2025250     20200   21.5300  144.7600       8.6        85       897        98
VIS    2025250     20200   21.5400  144.7400       8.6        84       897        99
VIS    2025250     20200   21.5300  144.7000       8.5        83       898       100
VIS    2025250     20200   21.5200  144.6800       8.4        83       899       100
VIS    2025250     20200   21.5400  144.6600       8.3        82       898        99
VIS    2025250     20200   21.5300  144.6300       8.7        81       898        99
VIS    2025250     20200   21.5200  144.6100       8.9        83       899        96
VIS    2025250     20200   21.5200  144.5800       8.9        87       900        92
VIS    2025250     20200   21.5200  144.5600       8.9        87       900        92
VIS    2025250     20200   21.5200  144.5400       9.0        85       900        93
VIS    2025250     20200   21.5400  144.5100       9.7        83       900        96
VIS    2025250     20200   21.5100  144.4700       9.1        86       900        98
VIS    2025250     20200   21.5300  144.4600       9.1        88       900        97
VIS    2025250     20200   21.5100  144.4200       9.0        90       899        97
VIS    2025250     20200   21.5200  144.4000       9.1        88       900        94
VIS    2025250     20200   21.5100  144.3700       9.3        83       901        97
VIS    2025250     20200   21.5100  144.3700       9.3        83       901        97
VIS    2025250     20200   21.5300  144.3400       9.0        80       902        96
VIS    2025250     20200   21.5200  144.3000       8.3        81       903        94
VIS    2025250     20200   21.5300  144.2800       8.5        82       903        95
VIS    2025250     20200   21.5200  144.2700       8.6        81       903        98
VIS    2025250     20200   21.5100  144.2400       8.6        82       905        99
VIS    2025250     20200   21.5100  144.2000       8.0        81       906        96
VIS    2025250     20200   21.5100  144.1800       8.1        81       905        94
VIS    2025250     20200   21.5200  144.1600       8.2        85       904        96
VIS    2025250     20200   21.5100  144.1200       7.6        86       904        99
VIS    2025250     20200   21.5100  144.1100       7.6        85       904        99
VIS    2025250     20200   21.5200  144.0800       7.6        84       904        98
VIS    2025250     20200   21.5100  144.0600       8.0        87       904        99
VIS    2025250     20200   21.5200  144.0300       8.0        89       904        98
VIS    2025250     20200   21.5200  144.0100       8.0        91       904        98
VIS    2025250     20200   21.5100  143.9800       8.2        89       905        99
VIS    2025250     20200   21.5300  143.9500       8.1        84       905        94
VIS    2025250     20200   21.5300  143.9300       8.1        84       905        98
VIS    2025250     20200   21.5200  143.9100       8.4        81       906        98
VIS    2025250     20200   21.5200  143.8900       8.7        83       906        99
VIS    2025250     20200   21.5200  143.8500       8.7        86       907        98
VIS    2025250     20200   21.5200  143.8400       8.8        90       909        97
VIS    2025250     20200   21.5300  143.8200       8.8        92       909        97
VIS    2025250     20200   21.5100  143.7900       8.8        90       906        97
VIS    2025250     20200   21.5100  143.7500       9.0        87       908        96
VIS    2025250     20200   21.5100  143.7300       8.9        86       909        99
VIS    2025250     20200   21.5100  143.7200       8.8        86       909        99
VIS    2025250     20200   21.5200  143.6900       9.0        84       910        99
VIS    2025250     20200   21.5300  143.6700       9.1        85       912       100
VIS    2025250     20200   21.5100  143.6400       9.1        88       912        97
VIS    2025250     20200   21.5100  143.6100       8.6        88       918        94
VIS    2025250     20200   21.5300  143.5400       9.7        80       957        99
VIS    2025250     20200   21.5300  143.5100       9.4        81       950        97
VIS    2025250     20200   21.5200  143.4900       9.5        85       957        97
VIS    2025250     20200   21.5300  143.4700       9.9        88       954        97
VIS    2025250     20200   21.5100  143.2500       9.4        90       972        95
VIS    2025250     20200   21.5000  143.2300       8.8        85       972        98
VIS    2025250     20200   21.5000  143.2100       8.7        82       972        98
VIS    2025250     20200   21.5000  143.1800       9.4        82       959        99
VIS    2025250     20200   21.5000  143.1700       9.6        82       956        99
VIS    2025250     20200   21.5200  143.1100       7.0        75       974        90
VIS    2025250     20200   21.5100  143.0900       8.8        76       934        98
VIS    2025250     20200   21.5100  143.0500       9.7        80       974       100
VIS    2025250     20200   21.5100  143.0300       9.0        86       935        99
VIS    2025250     20200   21.5100  143.0100       9.1        86       942        98
VIS    2025250     20200   21.5100  142.9900       9.9        86       942        99
VIS    2025250     20200   21.5000  142.9500       9.5        87       954        99
VIS    2025250     20200   21.5000  142.9300       9.4        85       954        99
VIS    2025250     20200   21.5200  142.9100       9.6        86       978        99
VIS    2025250     20200   21.5200  142.8800       9.4        86       962        99
VIS    2025250     20200   21.5000  142.8700       9.4        86       934        99
VIS    2025250     20200   21.5200  142.8500       9.5        86       937        99
VIS    2025250     20200   21.5000  142.8100       9.9        82       946        99
VIS    2025250     20200   21.5200  142.7900      10.6        76       964        98
VIS    2025250     20200   21.5000  142.7800      10.4        81       955        97
VIS    2025250     20200   21.5000  142.6600      10.6        92       968        93
VIS    2025250     20200   21.5200  142.6300      10.6        85       980        96
VIS    2025250     20200   21.5200  142.6300      10.6        85       980        95
VIS    2025250     20200   21.5000  142.6000      10.5        87       960        97
VIS    2025250     20200   21.5000  142.5700      10.5        84       937        96
VIS    2025250     20200   21.5100  142.5400      10.3        82       933        98
VIS    2025250     20200   21.5200  142.5200       9.7        83       934        99
VIS    2025250     20200   21.5200  142.4800       9.9        86       942        97
VIS    2025250     20200   21.5100  142.4800      10.1        87       942        96
VIS    2025250     20200   21.5000  142.4300      10.4        85       935        96
VIS    2025250     20200   21.5100  142.4100       9.7        81       940        98
VIS    2025250     20200   21.5000  142.3800       9.3        84       954        98
VIS    2025250     20200   21.5100  142.2400      10.3        84       944        98
VIS    2025250     20200   21.5000  142.2100      10.2        83       928       100
VIS    2025250     20200   21.5100  142.1600      10.0        81       928        99
VIS    2025250     20200   21.5100  142.1500      10.0        81       928        99
VIS    2025250     20200   21.5100  142.1200      10.0        83       926        98
VIS    2025250     20200   21.5100  142.0900      10.3        82       926        99
VIS    2025250     20200   21.5100  142.0700       9.8        82       933        99
VIS    2025250     20200   21.5200  142.0600       9.4        83       947        98
VIS    2025250     20200   21.5200  142.0400       9.0        82       947        97
VIS    2025250     20200   21.5200  142.0000       9.8        75       926        96
VIS    2025250     20200   21.5000  141.9600       9.6        72       925        95
VIS    2025250     20200   21.5200  141.9400       9.7        80       925        99
VIS    2025250     20200   21.5100  141.9100       9.6        84       925        99
VIS    2025250     20200   21.5200  141.8800       9.6        81       925        99
VIS    2025250     20200   21.5100  141.8200       9.6        81       926        99
VIS    2025250     20200   21.5100  141.8100       9.5        84       926       100
VIS    2025250     20200   21.5200  141.7700       9.6        83       926        99
VIS    2025250     20200   21.5100  141.7600       9.5        83       926        99
VIS    2025250     20200   21.5000  141.7300       9.2        81       927        99
VIS    2025250     20200   21.5000  141.7100       9.0        80       927        98
VIS    2025250     20200   21.5200  141.6400       8.7        80       928        97
VIS    2025250     20200   21.5000  141.6100       8.9        81       940        98
VIS    2025250     20200   21.5100  141.5600       9.4        80       975        99
VIS    2025250     20200   21.5000  141.5400       9.8        79       967        98
VIS    2025250     20200   21.5100  141.5100       9.8        79       940        98
VIS    2025250     20200   21.5000  141.4100       9.8        76       943        97
VIS    2025250     20200   21.5000  141.3900       9.4        78       935        98
VIS    2025250     20200   21.4900  141.3700       9.4        77       936        92
VIS    2025250     20200   21.5000  141.3300       9.8        76       935        98
VIS    2025250     20200   21.5100  141.3200       9.6        78       935        97
VIS    2025250     20200   21.5100  141.2900       9.3        80       934        98
VIS    2025250     20200   21.5000  141.2500       9.5        77       937        98
VIS    2025250     20200   21.4900  141.2200       9.6        75       942        95
VIS    2025250     20200   21.5100  141.1900       9.1        75       942        97
VIS    2025250     20200   21.5100  140.8200      10.4        79       975        97
VIS    2025250     20200   21.5100  140.7700       9.2        79       966        96
VIS    2025250     20200   21.5100  140.7500       9.3        80       955        98
VIS    2025250     20200   21.5100  140.7300       9.2        81       955        98
VIS    2025250     20200   21.4900  140.7100       9.4        83       948        95
VIS    2025250     20200   21.5100  140.6200       9.4        80       947        99
VIS    2025250     20200   21.5600  149.6200       4.1        80       941        90
VIS    2025250     20200   21.5300  147.7500       5.9        86       983        95
VIS    2025250     20200   21.5400  147.6900       6.2        95       965        94
VIS    2025250     20200   21.5200  146.4800       6.6        90       925        92
VIS    2025250     20200   21.5100  146.4600       6.2        84       925        96
VIS    2025250     20200   21.5100  145.1500       8.5        88       919        97
VIS    2025250     20200   21.5000  145.1200       7.5        76       919        94
VIS    2025250     20200   21.5100  145.0900       7.8        86       927        99
VIS    2025250     20200   21.5100  145.0900       8.1        87       927        99
VIS    2025250     20200   21.4900  145.0400       8.0        74       906        96
VIS    2025250     20200   21.4900  145.0400       8.1        74       906        96
VIS    2025250     20200   21.5000  145.0000       8.2        83       907        99
VIS    2025250     20200   21.5100  144.9700       8.2        91       907        97
VIS    2025250     20200   21.5000  144.9500       8.6        89       907        97
VIS    2025250     20200   21.5000  144.9200       8.9        84       901        92
VIS    2025250     20200   21.5100  144.9000       8.7        82       899        97
VIS    2025250     20200   21.5100  144.8700       8.2        83       899        96
VIS    2025250     20200   21.5100  144.8500       8.2        83       899        98
VIS    2025250     20200   21.5000  144.8300       8.6        79       899        92
VIS    2025250     20200   21.4900  144.8000       8.9        77       898        90
VIS    2025250     20200   21.5100  144.7900       8.7        81       898        94
VIS    2025250     20200   21.5000  144.7600       8.4        82       897        98
VIS    2025250     20200   21.4900  144.7300       8.9        86       899        97
VIS    2025250     20200   21.5000  144.7000       8.6        86       899        93
VIS    2025250     20200   21.5100  144.6700       8.4        84       899       100
VIS    2025250     20200   21.4900  144.6500       8.5        85       899        94
VIS    2025250     20200   21.4900  144.6200       8.7        83       899        95
VIS    2025250     20200   21.4900  144.6000       8.8        83       899        96
VIS    2025250     20200   21.5100  144.5800       8.9        87       900        94
VIS    2025250     20200   21.5000  144.5500       8.9        86       900        97
VIS    2025250     20200   21.5000  144.5200       9.2        84       900        97
VIS    2025250     20200   21.5000  144.4800       9.1        87       900        97
VIS    2025250     20200   21.5100  144.4300       9.1        90       899        96
VIS    2025250     20200   21.4900  144.4100       9.2        90       900        91
VIS    2025250     20200   21.5100  144.3700       9.3        84       901        97
VIS    2025250     20200   21.5100  144.3600       9.3        83       902        98
VIS    2025250     20200   21.4900  144.3200       8.7        80       902        95
VIS    2025250     20200   21.5100  144.3000       8.4        79       903        94
VIS    2025250     20200   21.4900  144.2800       8.8        78       903        97
VIS    2025250     20200   21.4900  144.2600       8.8        80       904        98
VIS    2025250     20200   21.5000  144.2400       8.6        82       905        99
VIS    2025250     20200   21.5100  144.2000       7.9        81       906        96
VIS    2025250     20200   21.5000  144.1900       7.9        82       906        95
VIS    2025250     20200   21.5100  144.1200       7.6        86       904        99
VIS    2025250     20200   21.5100  144.1100       7.6        85       904        99
VIS    2025250     20200   21.5100  144.0800       7.7        84       904        99
VIS    2025250     20200   21.5000  144.0600       8.0        86       904        99
VIS    2025250     20200   21.4900  144.0300       8.3        88       904        93
VIS    2025250     20200   21.4900  144.0000       8.4        89       904        92
VIS    2025250     20200   21.5000  143.9800       8.3        89       905        91
VIS    2025250     20200   21.4900  143.9500       8.2        87       905        94
VIS    2025250     20200   21.4900  143.9300       8.2        83       906        97
VIS    2025250     20200   21.4800  143.9100       8.0        80       906        98
VIS    2025250     20200   21.4800  143.8900       8.1        81       906        98
VIS    2025250     20200   21.5000  143.8600       8.6        85       906        99
VIS    2025250     20200   21.5000  143.8300       8.9        92       907        96
VIS    2025250     20200   21.5000  143.8100       8.9        91       907        97
VIS    2025250     20200   21.5000  143.7900       8.8        88       907        98
VIS    2025250     20200   21.4800  143.7600       8.8        84       907        98
VIS    2025250     20200   21.4800  143.7400       8.9        84       909        94
VIS    2025250     20200   21.5000  143.7200       8.9        86       909        98
VIS    2025250     20200   21.4900  143.6800       9.3        89       909        92
VIS    2025250     20200   21.4800  143.6000       9.2        88       918        92
VIS    2025250     20200   21.5000  143.5300       9.1        81       964        99
VIS    2025250     20200   21.5000  143.5200       9.1        82       964        98
VIS    2025250     20200   21.4900  143.2500       9.3        87       934        92
VIS    2025250     20200   21.4900  143.1300       8.7        80       941        94
VIS    2025250     20200   21.4800  143.0900       8.9        83       924        96
VIS    2025250     20200   21.4800  143.0500       9.0        83       931        95
VIS    2025250     20200   21.4800  142.9500       9.5        89       936        93
VIS    2025250     20200   21.4900  142.8900       9.0        87       934        91
VIS    2025250     20200   21.4900  142.8500       9.6        85       937        96
VIS    2025250     20200   21.4800  142.8400       9.8        85       937        97
VIS    2025250     20200   21.4800  142.8100       9.7        86       938        96
VIS    2025250     20200   21.4800  142.7700      10.0        86       946        94
VIS    2025250     20200   21.4800  142.7700       9.9        87       946        93
VIS    2025250     20200   21.4800  142.6300      10.2        89       929        97
VIS    2025250     20200   21.4900  142.5900      10.3        85       933        97
VIS    2025250     20200   21.4700  142.5600      10.0        78       923        93
VIS    2025250     20200   21.4900  142.5300      10.0        81       928        94
VIS    2025250     20200   21.5000  142.5200       9.9        84       930        91
VIS    2025250     20200   21.4900  142.4900       9.9        87       930        91
VIS    2025250     20200   21.4700  142.4600       9.6        86       922        95
VIS    2025250     20200   21.4800  142.4300      10.0        84       924        95
VIS    2025250     20200   21.4700  142.4200      10.0        83       924        94
VIS    2025250     20200   21.4700  142.3900       9.6        82       928        96
VIS    2025250     20200   21.4800  142.3700       9.5        83       935        96
VIS    2025250     20200   21.4800  142.2600       9.7        87       956        95
VIS    2025250     20200   21.4700  142.2500       9.6        86       948        96
VIS    2025250     20200   21.4900  142.2200      10.2        82       929        94
VIS    2025250     20200   21.4900  142.2000       9.9        81       927        98
VIS    2025250     20200   21.4900  142.1800       9.7        81       927        98
VIS    2025250     20200   21.4800  142.1500      10.0        80       931        99
VIS    2025250     20200   21.4700  142.1100       9.9        80       927        98
VIS    2025250     20200   21.4700  142.1000       9.8        80       926        98
VIS    2025250     20200   21.4800  142.0600       9.9        80       928        99
VIS    2025250     20200   21.4700  142.0500       9.9        79       927        99
VIS    2025250     20200   21.4700  142.0100      10.1        75       926        95
VIS    2025250     20200   21.4800  142.0000      10.1        72       926        94
VIS    2025250     20200   21.4700  141.9700       9.8        72       925        93
VIS    2025250     20200   21.4900  141.9400       9.4        82       924        96
VIS    2025250     20200   21.4800  141.9100       9.6        84       925        96
VIS    2025250     20200   21.4900  141.8900       9.5        85       926        94
VIS    2025250     20200   21.4900  141.8800       9.5        84       926        95
VIS    2025250     20200   21.4700  141.8500       9.8        80       926        99
VIS    2025250     20200   21.4700  141.8100       9.6        79       928        97
VIS    2025250     20200   21.4800  141.7900       9.4        78       928        97
VIS    2025250     20200   21.4700  141.7700       9.1        80       928        97
VIS    2025250     20200   21.4800  141.7500       9.1        81       928        97
VIS    2025250     20200   21.4800  141.7300       9.2        81       928        95
VIS    2025250     20200   21.4700  141.6200       9.0        76       962        94
VIS    2025250     20200   21.4900  141.6000       9.1        80       952        92
VIS    2025250     20200   21.4700  141.5900       9.2        82       961        97
VIS    2025250     20200   21.4700  141.5500      10.1        86       970        97
VIS    2025250     20200   21.4700  141.5200      10.2        79       955        97
VIS    2025250     20200   21.4800  141.4900      10.0        77       948        94
VIS    2025250     20200   21.4800  141.4700       9.7        76       956        94
VIS    2025250     20200   21.4800  141.4500       9.9        76       956        95
VIS    2025250     20200   21.4800  141.4300      10.1        76       952        97
VIS    2025250     20200   21.4900  141.3900       9.6        77       940        98
VIS    2025250     20200   21.4900  141.3700       9.4        77       936        96
VIS    2025250     20200   21.4900  141.3500       9.8        76       936        97
VIS    2025250     20200   21.4700  141.3200      10.1        73       948        96
VIS    2025250     20200   21.4800  141.3000       9.8        75       935        97
VIS    2025250     20200   21.4800  141.2700       9.8        75       938        97
VIS    2025250     20200   21.4900  141.2700       9.7        76       938        97
VIS    2025250     20200   21.4700  141.2400       9.8        73       950        96
VIS    2025250     20200   21.4800  141.2100       9.2        74       949        94
VIS    2025250     20200   21.4800  140.7800       9.5        82       958        97
VIS    2025250     20200   21.4800  140.7700       9.4        81       955        95
VIS    2025250     20200   21.4700  140.7400       9.4        83       955        97
VIS    2025250     20200   21.4900  140.7100       9.4        83       948        95
VIS    2025250     20200   21.4700  140.6900       9.4        85       941        99
VIS    2025250     20200   21.4900  140.6700       9.5        83       940        97
VIS    2025250     20200   21.4800  140.4600       9.7        76       977        90
VIS    2025250     20200   21.5000  146.4600       6.3        85       925        94
VIS    2025250     20200   21.4900  145.1800       8.8        90       928        91
VIS    2025250     20200   21.4900  145.1500       8.0        82       916        94
VIS    2025250     20200   21.4900  145.1100       7.4        78       921        93
VIS    2025250     20200   21.4800  145.1000       7.4        80       921        96
VIS    2025250     20200   21.4800  145.0700       8.0        75       906        95
VIS    2025250     20200   21.4700  145.0600       8.1        76       906        97
VIS    2025250     20200   21.4800  145.0300       8.3        82       905        97
VIS    2025250     20200   21.4700  144.9900       8.3        89       900        96
VIS    2025250     20200   21.4900  144.9700       8.2        90       901        90
VIS    2025250     20200   21.4800  144.9400       8.6        89       898        93
VIS    2025250     20200   21.4700  144.9300       8.9        89       898        92
VIS    2025250     20200   21.4900  144.9100       9.2        84       898        95
VIS    2025250     20200   21.4900  144.8800       9.1        82       898        94
VIS    2025250     20200   21.4800  144.8400       8.8        79       898        96
VIS    2025250     20200   21.4700  144.8300       8.8        79       898        95
VIS    2025250     20200   21.4900  144.7800       8.6        78       897        93
VIS    2025250     20200   21.4700  144.7500       8.7        84       897        97
VIS    2025250     20200   21.4700  144.7300       8.9        85       897        98
VIS    2025250     20200   21.4800  144.7000       8.9        87       898        97
VIS    2025250     20200   21.4700  144.6800       8.8        89       898        95
VIS    2025250     20200   21.4700  144.6400       8.6        85       899        96
VIS    2025250     20200   21.4900  144.6300       8.5        84       899        93
VIS    2025250     20200   21.4900  144.6000       8.8        83       899        97
VIS    2025250     20200   21.4600  144.5700       9.1        79       900        98
VIS    2025250     20200   21.4600  144.5400       9.0        84       900        97
VIS    2025250     20200   21.4600  144.5200       9.0        91       900        91
VIS    2025250     20200   21.4800  144.4000       9.2        89       900        92
VIS    2025250     20200   21.4700  144.3700       9.2        83       901        94
VIS    2025250     20200   21.4600  144.3500       9.1        80       902        94
VIS    2025250     20200   21.4600  144.3100       8.8        80       902        96
VIS    2025250     20200   21.4800  144.2900       8.6        80       903        98
VIS    2025250     20200   21.4800  144.2800       8.8        80       903        98
VIS    2025250     20200   21.4800  144.2500       8.5        81       904        99
VIS    2025250     20200   21.4700  144.2200       8.2        84       905        98
VIS    2025250     20200   21.4700  144.2000       8.3        83       904        97
VIS    2025250     20200   21.4700  144.1700       8.0        84       904        98
VIS    2025250     20200   21.4700  144.1500       7.9        86       904        95
VIS    2025250     20200   21.4700  144.1400       7.8        86       904        95
VIS    2025250     20200   21.4800  144.1000       7.7        84       904        95
VIS    2025250     20200   21.4600  144.0700       8.2        87       904        98
VIS    2025250     20200   21.4600  144.0600       8.2        87       904        98
VIS    2025250     20200   21.4700  144.0200       8.5        88       904        95
VIS    2025250     20200   21.4600  144.0100       8.4        88       904        95
VIS    2025250     20200   21.4600  143.9900       8.4        90       905        95
VIS    2025250     20200   21.4700  143.9600       8.3        88       905        97
VIS    2025250     20200   21.4700  143.9300       8.2        83       906        99
VIS    2025250     20200   21.4800  143.9000       8.0        80       906        98
VIS    2025250     20200   21.4700  143.8900       8.0        79       906        99
VIS    2025250     20200   21.4600  143.8500       8.6        80       907        99
VIS    2025250     20200   21.4700  143.8300       8.5        84       905        96
VIS    2025250     20200   21.4600  143.8000       8.7        84       907        97
VIS    2025250     20200   21.4600  143.7700       8.7        81       907        99
VIS    2025250     20200   21.4600  143.7500       8.6        82       908       100
VIS    2025250     20200   21.4600  143.7300       8.5        87       909        98
VIS    2025250     20200   21.4600  143.7100       8.9        91       909        94
VIS    2025250     20200   21.4600  143.6200       9.1        89       913        91
VIS    2025250     20200   21.4700  143.6100       9.0        89       916        92
VIS    2025250     20200   21.4700  143.2500       9.1        88       934        91
VIS    2025250     20200   21.4500  143.2400       9.2        83       919        98
VIS    2025250     20200   21.4500  143.2000       9.3        83       920        98
VIS    2025250     20200   21.4600  143.1800       9.2        84       922        97
VIS    2025250     20200   21.4600  143.1500       9.4        84       921        97
VIS    2025250     20200   21.4500  143.1400       9.3        85       921        97
VIS    2025250     20200   21.4500  143.0500       9.2        85       924        90
VIS    2025250     20200   21.4700  142.8600       9.4        89       936        92
VIS    2025250     20200   21.4700  142.8400       9.9        86       937        97
VIS    2025250     20200   21.4700  142.8000       9.5        87       937        93
VIS    2025250     20200   21.4500  142.7800       9.5        87       938        93
VIS    2025250     20200   21.4700  142.7600       9.8        88       946        91
VIS    2025250     20200   21.4600  142.6800      10.1        87       932        97
VIS    2025250     20200   21.4500  142.6500      10.0        81       923        98
VIS    2025250     20200   21.4600  142.6400      10.0        84       925        99
VIS    2025250     20200   21.4600  142.6200       9.9        81       922        97
VIS    2025250     20200   21.4500  142.5900       9.9        76       922        91
VIS    2025250     20200   21.4500  142.5800      10.1        75       922        90
VIS    2025250     20200   21.4600  142.5400       9.9        76       923        95
VIS    2025250     20200   21.4500  142.5200       9.9        79       922        96
VIS    2025250     20200   21.4500  142.5000      10.1        79       921        96
VIS    2025250     20200   21.4500  142.4600       9.7        80       921        96
VIS    2025250     20200   21.4700  142.4300       9.8        84       924        94
VIS    2025250     20200   21.4700  142.4100       9.9        80       925        96
VIS    2025250     20200   21.4500  142.3900       9.7        81       925        97
VIS    2025250     20200   21.4600  142.3600       9.6        82       950        96
VIS    2025250     20200   21.4700  142.3300       9.6        81       955        96
VIS    2025250     20200   21.4600  142.3200       9.6        80       972        96
VIS    2025250     20200   21.4500  142.3000       9.2        85       978        95
VIS    2025250     20200   21.4500  142.2600       9.3        87       966        96
VIS    2025250     20200   21.4600  142.2400       9.6        85       941        99
VIS    2025250     20200   21.4500  142.2100      10.2        82       925        98
VIS    2025250     20200   21.4500  142.1900      10.2        80       925        97
VIS    2025250     20200   21.4500  142.1700       9.9        80       925        99
VIS    2025250     20200   21.4700  142.1600      10.0        79       929        99
VIS    2025250     20200   21.4500  142.1200       9.8        81       927        99
VIS    2025250     20200   21.4500  142.1100       9.8        81       925        99
VIS    2025250     20200   21.4500  142.0800       9.7        82       925        99
VIS    2025250     20200   21.4700  142.0600       9.9        79       927        99
VIS    2025250     20200   21.4500  142.0300      10.1        77       926        97
VIS    2025250     20200   21.4600  142.0100      10.2        76       925        95
VIS    2025250     20200   21.4700  141.9600       9.7        74       925        95
VIS    2025250     20200   21.4500  141.9400       9.8        76       925        97
VIS    2025250     20200   21.4500  141.9200       9.7        78       925        98
VIS    2025250     20200   21.4500  141.8900       9.8        79       927        98
VIS    2025250     20200   21.4500  141.8800       9.8        79       927        98
VIS    2025250     20200   21.4600  141.8400       9.9        79       927        98
VIS    2025250     20200   21.4700  141.8400       9.9        79       927        98
VIS    2025250     20200   21.4500  141.7900       9.9        74       928        93
VIS    2025250     20200   21.4400  141.7700       9.5        74       929        92
VIS    2025250     20200   21.4400  141.7400       9.4        73       929        93
VIS    2025250     20200   21.4500  141.7200       9.4        74       929        94
VIS    2025250     20200   21.4400  141.7100       9.3        72       930        92
VIS    2025250     20200   21.4500  141.6500       9.1        73       962        91
VIS    2025250     20200   21.4600  141.6200       9.1        76       962        94
VIS    2025250     20200   21.4400  141.6000       9.6        78       976        96
VIS    2025250     20200   21.4400  141.5700      10.2        87       965        95
VIS    2025250     20200   21.4600  141.5500      10.3        85       965        95
VIS    2025250     20200   21.4400  141.5300      10.6        81       958        98
VIS    2025250     20200   21.4600  141.4700       9.8        76       952        98
VIS    2025250     20200   21.4600  141.4200      10.0        75       958        97
VIS    2025250     20200   21.4500  141.4100      10.1        76       964        98
VIS    2025250     20200   21.4500  141.3400      10.2        73       961        96
VIS    2025250     20200   21.4600  141.3200      10.0        74       949        95
VIS    2025250     20200   21.4500  141.2900      10.0        75       949        95
VIS    2025250     20200   21.4500  141.2700      10.2        76       952        98
VIS    2025250     20200   21.4400  140.7400       9.3        83       948        97
VIS    2025250     20200   21.4500  140.7400       9.2        83       948        96
VIS    2025250     20200   21.4600  140.7000       9.3        85       944        98
VIS    2025250     20200   21.4500  145.2400       8.1        88       972        91
VIS    2025250     20200   21.4500  145.2300       8.3        90       972        90
VIS    2025250     20200   21.4500  145.2000       8.1        89       941        91
VIS    2025250     20200   21.4700  145.1900       8.2        87       928        96
VIS    2025250     20200   21.4500  145.1400       8.2        83       921        94
VIS    2025250     20200   21.4500  145.1300       8.1        81       916        94
VIS    2025250     20200   21.4600  145.0900       7.4        74       911        97
VIS    2025250     20200   21.4600  145.0900       7.2        73       911        97
VIS    2025250     20200   21.4500  145.0600       8.0        79       905        97
VIS    2025250     20200   21.4600  145.0200       8.4        88       904        96
VIS    2025250     20200   21.4600  145.0100       8.3        89       904        95
VIS    2025250     20200   21.4600  144.9800       8.4        89       897        95
VIS    2025250     20200   21.4600  144.9500       8.7        90       895        93
VIS    2025250     20200   21.4400  144.9400       8.5        87       895        96
VIS    2025250     20200   21.4400  144.8900       8.7        81       896        96
VIS    2025250     20200   21.4600  144.8700       9.0        81       897        93
VIS    2025250     20200   21.4500  144.8500       8.8        80       897        96
VIS    2025250     20200   21.4400  144.8300       8.7        80       897        97
VIS    2025250     20200   21.4600  144.8200       8.8        79       897        92
VIS    2025250     20200   21.4600  144.7500       8.7        83       897        97
VIS    2025250     20200   21.4600  144.7300       8.8        84       897        99
VIS    2025250     20200   21.4600  144.7000       8.9        88       897        96
VIS    2025250     20200   21.4500  144.6700       8.9        88       898        95
VIS    2025250     20200   21.4500  144.6600       8.8        87       898        96
VIS    2025250     20200   21.4500  144.6300       8.8        83       900        98
VIS    2025250     20200   21.4500  144.6200       8.9        83       900        98
VIS    2025250     20200   21.4400  144.5900       9.1        80       900        97
VIS    2025250     20200   21.4600  144.5500       9.0        81       900        98
VIS    2025250     20200   21.4600  144.5400       9.0        84       900        97
VIS    2025250     20200   21.4400  144.4300       9.8        89       902        93
VIS    2025250     20200   21.4400  144.4000       9.6        84       901        92
VIS    2025250     20200   21.4400  144.3700       9.1        77       902        93
VIS    2025250     20200   21.4500  144.3500       8.9        77       902        93
VIS    2025250     20200   21.4400  144.3400       8.6        76       902        97
VIS    2025250     20200   21.4600  144.3200       8.8        80       902        97
VIS    2025250     20200   21.4400  144.2800       8.1        85       902        99
VIS    2025250     20200   21.4400  144.2600       8.0        84       903        99
VIS    2025250     20200   21.4500  144.2400       8.1        83       903        99
VIS    2025250     20200   21.4400  144.2000       8.5        82       904        93
VIS    2025250     20200   21.4400  144.1900       8.5        82       904        95
VIS    2025250     20200   21.4600  144.1600       8.1        87       904        96
VIS    2025250     20200   21.4400  144.1300       7.8        86       906        95
VIS    2025250     20200   21.4500  144.1000       7.8        84       904        97
VIS    2025250     20200   21.4500  144.0800       8.0        86       904        95
VIS    2025250     20200   21.4600  144.0700       8.1        86       904        96
VIS    2025250     20200   21.4300  144.0300       8.5        88       904        97
VIS    2025250     20200   21.4400  144.0000       8.5        90       904        95
VIS    2025250     20200   21.4300  143.9900       8.5        90       904        95
VIS    2025250     20200   21.4500  143.9500       8.3        89       905        96
VIS    2025250     20200   21.4400  143.9500       8.3        87       905        97
VIS    2025250     20200   21.4500  143.9100       8.2        80       906       100
VIS    2025250     20200   21.4500  143.8800       8.2        82       906        99
VIS    2025250     20200   21.4400  143.8500       8.5        80       907        98
VIS    2025250     20200   21.4400  143.8400       8.5        80       907        97
VIS    2025250     20200   21.4400  143.8100       8.8        82       907        94
VIS    2025250     20200   21.4400  143.7900       8.8        82       907        95
VIS    2025250     20200   21.4500  143.7700       8.7        81       907        99
VIS    2025250     20200   21.4500  143.7300       8.4        86       909        99
VIS    2025250     20200   21.4500  143.7200       8.6        89       909        97
VIS    2025250     20200   21.4500  143.6200       8.9        89       915        91
VIS    2025250     20200   21.4500  143.2600       8.9        86       919        95
VIS    2025250     20200   21.4300  143.2400       9.4        79       919        96
VIS    2025250     20200   21.4400  143.2300       9.3        81       919        98
VIS    2025250     20200   21.4500  143.2000       9.2        84       920        97
VIS    2025250     20200   21.4400  143.1600       9.3        83       920        97
VIS    2025250     20200   21.4400  143.1500       9.2        84       920        97
VIS    2025250     20200   21.4300  143.1100       9.2        89       922        94
VIS    2025250     20200   21.4300  142.9400       9.9        90       922        94
VIS    2025250     20200   21.4300  142.9300       9.7        88       922        96
VIS    2025250     20200   21.4300  142.9100       9.5        86       922        95
VIS    2025250     20200   21.4500  142.8500       9.9        91       936        93
VIS    2025250     20200   21.4300  142.8100       9.7        84       932        95
VIS    2025250     20200   21.4500  142.7900       9.5        86       935        94
VIS    2025250     20200   21.4500  142.7800       9.5        87       937        93
VIS    2025250     20200   21.4300  142.7600       9.7        83       935        98
VIS    2025250     20200   21.4300  142.7300       9.7        85       933        98
VIS    2025250     20200   21.4300  142.6900       9.5        85       927        96
VIS    2025250     20200   21.4400  142.6700       9.8        82       927        97
VIS    2025250     20200   21.4500  142.6500      10.0        80       923        98
VIS    2025250     20200   21.4500  142.6300      10.0        78       922        97
VIS    2025250     20200   21.4400  142.5900       9.9        76       922        91
VIS    2025250     20200   21.4400  142.5800      10.0        75       922        90
VIS    2025250     20200   21.4400  142.5600       9.9        75       922        94
VIS    2025250     20200   21.4400  142.5300       9.8        78       922        95
VIS    2025250     20200   21.4200  142.5000       9.7        78       922        94
VIS    2025250     20200   21.4300  142.4900       9.8        77       922        92
VIS    2025250     20200   21.4300  142.4600       9.6        78       922        94
VIS    2025250     20200   21.4200  142.4200       9.4        79       924        97
VIS    2025250     20200   21.4400  142.4100       9.5        80       924        95
VIS    2025250     20200   21.4400  142.3700       9.5        81       930        97
VIS    2025250     20200   21.4300  142.3400       9.6        80       972        98
VIS    2025250     20200   21.4400  142.3300       9.6        79       972        98
VIS    2025250     20200   21.4400  142.3000       9.2        85       978        96
VIS    2025250     20200   21.4300  142.2700       9.3        88       978        94
VIS    2025250     20200   21.4400  142.2600       9.4        88       956        96
VIS    2025250     20200   21.4200  142.2200      10.0        78       925        97
VIS    2025250     20200   21.4400  142.2000      10.3        80       925        95
VIS    2025250     20200   21.4400  142.1900      10.3        79       924        95
VIS    2025250     20200   21.4300  142.1600       9.8        79       925        98
VIS    2025250     20200   21.4400  142.1300       9.6        80       926        98
VIS    2025250     20200   21.4400  142.1100       9.7        81       925        99
VIS    2025250     20200   21.4300  142.0800       9.7        84       924        99
VIS    2025250     20200   21.4400  142.0500      10.1        79       925        99
VIS    2025250     20200   21.4200  142.0300      10.3        79       925        98
VIS    2025250     20200   21.4400  142.0000      10.1        76       925        96
VIS    2025250     20200   21.4300  141.9800       9.8        78       925        97
VIS    2025250     20200   21.4200  141.9500      10.1        75       925        97
VIS    2025250     20200   21.4400  141.9400       9.8        76       925        96
VIS    2025250     20200   21.4400  141.9100       9.7        78       926        97
VIS    2025250     20200   21.4400  141.8800       9.8        79       927        98
VIS    2025250     20200   21.4300  141.8500       9.6        77       929        97
VIS    2025250     20200   21.4200  141.8200       9.9        75       929        97
VIS    2025250     20200   21.4200  141.8000      10.1        72       930        95
VIS    2025250     20200   21.4200  141.7800      10.1        71       930        94
VIS    2025250     20200   21.4400  141.7700       9.6        73       929        92
VIS    2025250     20200   21.4200  141.7300       9.3        71       931        93
VIS    2025250     20200   21.4300  141.7100       9.2        71       930        93
VIS    2025250     20200   21.4300  141.6200       9.6        76       976        96
VIS    2025250     20200   21.4300  141.5800      10.1        84       963        95
VIS    2025250     20200   21.4200  141.5500      10.5        82       962        98
VIS    2025250     20200   21.4300  140.7200       9.1        84       959        96
VIS    2025250     20200   21.4200  140.7100       9.3        84       959        96
VIS    2025250     20200   21.4100  140.5000       9.7        84       984        95
VIS    2025250     20200   21.4500  148.3200       5.6        90       976        93
VIS    2025250     20200   21.4500  146.4900       6.2        82       969        92
VIS    2025250     20200   21.4400  145.2600       7.7        84       983        90
VIS    2025250     20200   21.4400  145.2500       7.9        87       972        91
VIS    2025250     20200   21.4200  145.2200       7.6        88       951        91
VIS    2025250     20200   21.4400  145.1300       8.2        84       916        97
VIS    2025250     20200   21.4200  145.1100       8.2        81       910        99
VIS    2025250     20200   21.4400  145.1000       8.1        78       910        98
VIS    2025250     20200   21.4200  145.0500       8.3        80       903        99
VIS    2025250     20200   21.4300  145.0500       8.2        80       903        98
VIS    2025250     20200   21.4200  145.0000       8.6        87       896        97
VIS    2025250     20200   21.4300  144.9900       8.7        90       895        95
VIS    2025250     20200   21.4200  144.9500       8.8        89       895        96
VIS    2025250     20200   21.4400  144.9400       8.5        86       895        97
VIS    2025250     20200   21.4200  144.9200       8.8        83       895        96
VIS    2025250     20200   21.4300  144.8800       9.1        80       897        91
VIS    2025250     20200   21.4200  144.8600       9.3        78       898        96
VIS    2025250     20200   21.4400  144.8300       8.8        80       897        98
VIS    2025250     20200   21.4200  144.8200       8.7        79       897        98
VIS    2025250     20200   21.4200  144.7800       7.9        84       896        98
VIS    2025250     20200   21.4300  144.7700       8.1        84       896        98
VIS    2025250     20200   21.4200  144.7500       7.6        82       895       100
VIS    2025250     20200   21.4400  144.7200       8.7        85       897        99
VIS    2025250     20200   21.4400  144.6800       9.1        86       898        96
VIS    2025250     20200   21.4300  144.6700       9.0        85       898        98
VIS    2025250     20200   21.4200  144.6400       8.8        80       900        98
VIS    2025250     20200   21.4100  144.6100       9.1        79       900        97
VIS    2025250     20200   21.4100  144.6000       9.1        79       900        97
VIS    2025250     20200   21.4300  144.5800       9.1        80       901        95
VIS    2025250     20200   21.4200  144.5500       9.4        84       901        95
VIS    2025250     20200   21.4200  144.5100       9.7        89       899        95
VIS    2025250     20200   21.4100  144.4400      10.0        87       903        92
VIS    2025250     20200   21.4300  144.4200       9.8        87       903        91
VIS    2025250     20200   21.4100  144.4000       9.6        81       903        93
VIS    2025250     20200   21.4300  144.3800       9.3        78       902        93
VIS    2025250     20200   21.4300  144.3500       8.7        76       902        97
VIS    2025250     20200   21.4200  144.3300       8.1        77       902        97
VIS    2025250     20200   21.4300  144.2800       8.1        85       902        99
VIS    2025250     20200   21.4300  144.2800       8.1        85       902        99
VIS    2025250     20200   21.4300  144.2400       7.9        82       903        96
VIS    2025250     20200   21.4100  144.2100       8.1        77       904        91
VIS    2025250     20200   21.4200  144.2000       8.1        78       904        92
VIS    2025250     20200   21.4200  144.1800       7.9        80       904        97
VIS    2025250     20200   21.4200  144.1300       7.8        85       906        93
VIS    2025250     20200   21.4100  144.1300       7.8        85       906        93
VIS    2025250     20200   21.4100  144.1000       8.4        83       904        97
VIS    2025250     20200   21.4100  144.0700       8.4        84       904        96
VIS    2025250     20200   21.4100  144.0500       8.4        86       904        94
VIS    2025250     20200   21.4100  144.0100       8.7        88       904        95
VIS    2025250     20200   21.4300  143.9900       8.5        90       904        95
VIS    2025250     20200   21.4200  143.9800       8.6        89       904        96
VIS    2025250     20200   21.4100  143.9300       9.0        82       905        99
VIS    2025250     20200   21.4100  143.9300       9.0        84       905        98
VIS    2025250     20200   21.4100  143.8800       8.8        79       905        97
VIS    2025250     20200   21.4200  143.8800       8.6        79       906        97
VIS    2025250     20200   21.4200  143.8500       8.8        76       907        92
VIS    2025250     20200   21.4200  143.8100       8.9        82       907        97
VIS    2025250     20200   21.4100  143.8000       8.7        85       908        95
VIS    2025250     20200   21.4200  143.7700       8.4        85       908        95
VIS    2025250     20200   21.4300  143.7500       8.3        85       908        99
VIS    2025250     20200   21.4100  143.7300       8.9        91       910        94
VIS    2025250     20200   21.4200  143.3700       9.1        93       949        90
VIS    2025250     20200   21.4200  143.3400       9.3        92       918        94
VIS    2025250     20200   21.4100  143.2900       9.2        89       918        95
VIS    2025250     20200   21.4100  143.2700       9.4        82       918        98
VIS    2025250     20200   21.4100  143.2300       9.5        77       920        93
VIS    2025250     20200   21.4000  143.2300       9.4        79       920        93
VIS    2025250     20200   21.4200  143.1800       9.3        82       920        98
VIS    2025250     20200   21.4100  143.1600       9.3        83       920        98
VIS    2025250     20200   21.4100  143.1500       9.2        84       920        97
VIS    2025250     20200   21.4100  143.1100       9.2        89       922        95
VIS    2025250     20200   21.4200  143.1000       9.2        89       922        92
VIS    2025250     20200   21.4100  143.0200       9.6        91       921        98
VIS    2025250     20200   21.4000  142.9700       9.5       100       919        93
VIS    2025250     20200   21.4200  142.9300      10.0        90       922        96
VIS    2025250     20200   21.4200  142.9300       9.8        87       922        97
VIS    2025250     20200   21.4200  142.9000       9.5        86       922        96
VIS    2025250     20200   21.4200  142.8700       9.6        87       928        95
VIS    2025250     20200   21.4000  142.8400       9.3        86       926        94
VIS    2025250     20200   21.4000  142.8200       9.2        85       924        93
VIS    2025250     20200   21.4000  142.7900       9.4        81       921        96
VIS    2025250     20200   21.4000  142.7800       9.5        80       921        96
VIS    2025250     20200   21.4100  142.7400       9.8        80       921        98
VIS    2025250     20200   21.4000  142.7300       9.7        82       921        98
VIS    2025250     20200   21.4100  142.6900       9.5        84       927        96
VIS    2025250     20200   21.4200  142.6700       9.7        81       925        98
VIS    2025250     20200   21.4100  142.6600       9.9        79       923        98
VIS    2025250     20200   21.4200  142.6200      10.1        75       921        96
VIS    2025250     20200   21.4000  142.5900       9.8        75       922        96
VIS    2025250     20200   21.4000  142.5800       9.7        76       922        97
VIS    2025250     20200   21.4000  142.5500       9.7        77       922        98
VIS    2025250     20200   21.4000  142.5100       9.8        76       923        97
VIS    2025250     20200   21.4200  142.5000       9.7        78       922        92
VIS    2025250     20200   21.4000  142.4600       9.8        76       923        92
VIS    2025250     20200   21.4000  142.4400       9.6        77       923        97
VIS    2025250     20200   21.4200  142.4200       9.3        79       924        98
VIS    2025250     20200   21.4100  142.3400       9.7        79       977        98
VIS    2025250     20200   21.4100  142.3400       9.7        79       977        98
VIS    2025250     20200   21.4000  142.2900       9.3        86       978        92
VIS    2025250     20200   21.4100  142.2900       9.3        87       978        94
VIS    2025250     20200   21.4000  142.2500       9.8        82       928        99
VIS    2025250     20200   21.4100  142.2200       9.8        77       924        97
VIS    2025250     20200   21.4200  142.2000      10.0        77       924        97
VIS    2025250     20200   21.4200  142.1700       9.7        79       925        98
VIS    2025250     20200   21.4000  142.1600       9.7        79       923        98
VIS    2025250     20200   21.4000  142.1200       9.6        79       923        98
VIS    2025250     20200   21.4100  142.1100       9.6        80       923        98
VIS    2025250     20200   21.4000  142.0700       9.5        84       924        96
VIS    2025250     20200   21.4000  142.0700       9.6        84       924        96
VIS    2025250     20200   21.4000  142.0300      10.3        79       925        96
VIS    2025250     20200   21.4000  142.0200      10.5        78       925        96
VIS    2025250     20200   21.4100  141.9800       9.8        78       925        97
VIS    2025250     20200   21.4200  141.9500      10.0        74       926        97
VIS    2025250     20200   21.4100  141.9400      10.0        74       926        97
VIS    2025250     20200   21.4200  141.9100       9.3        77       927        97
VIS    2025250     20200   21.3900  141.8900       9.0        78       928        94
VIS    2025250     20200   21.4100  141.8500       9.3        75       929        95
VIS    2025250     20200   21.4100  141.8200       9.8        73       930        95
VIS    2025250     20200   21.4100  141.8000      10.1        72       930        94
VIS    2025250     20200   21.4100  141.7800      10.2        71       931        95
VIS    2025250     20200   21.4100  141.6300       9.8        79       978        97
VIS    2025250     20200   21.4000  140.7700       9.4        75       986        95
VIS    2025250     20200   21.4000  140.5000       9.9        84       974        97
VIS    2025250     20200   21.4000  140.4700       9.6        85       964        95
VIS    2025250     20200   21.4200  147.8100       4.9        80       987        90
VIS    2025250     20200   21.4200  145.2600       8.3        82       972        92
VIS    2025250     20200   21.3900  145.2300       9.0        84       950        90
VIS    2025250     20200   21.4100  145.2200       7.8        86       951        92
VIS    2025250     20200   21.4100  145.1600       7.7        92       926        93
VIS    2025250     20200   21.4000  145.1400       8.0        87       920        99
VIS    2025250     20200   21.4100  145.1000       8.3        81       909        99
VIS    2025250     20200   21.4000  145.1000       8.3        81       909        98
VIS    2025250     20200   21.4000  145.0700       8.5        82       903        98
VIS    2025250     20200   21.4000  145.0500       8.8        83       900        97
VIS    2025250     20200   21.4100  145.0000       8.6        87       896        97
VIS    2025250     20200   21.4100  144.9900       8.9        91       895        94
VIS    2025250     20200   21.4100  144.9700       9.0        92       895        93
VIS    2025250     20200   21.4000  144.9400       9.1        87       895        94
VIS    2025250     20200   21.3900  144.9200       9.7        85       895        93
VIS    2025250     20200   21.4100  144.8800       9.6        82       897        92
VIS    2025250     20200   21.4100  144.8600       9.3        78       898        96
VIS    2025250     20200   21.4100  144.8500       9.2        78       898        96
VIS    2025250     20200   21.3900  144.8100       8.7        81       896        98
VIS    2025250     20200   21.4100  144.7800       7.7        85       896        99
VIS    2025250     20200   21.3900  144.7600       7.9        87       894        98
VIS    2025250     20200   21.4100  144.7500       7.6        82       895       100
VIS    2025250     20200   21.4000  144.7000       8.8        84       898        96
VIS    2025250     20200   21.3900  144.6800       9.2        83       898        95
VIS    2025250     20200   21.3900  144.6600       9.1        80       899        97
VIS    2025250     20200   21.4100  144.6400       8.9        78       900        98
VIS    2025250     20200   21.4000  144.6200       9.1        78       900        95
VIS    2025250     20200   21.4100  144.5900       9.2        79       900        97
VIS    2025250     20200   21.4000  144.5600       9.3        85       900        97
VIS    2025250     20200   21.4000  144.5500       9.5        85       900        96
VIS    2025250     20200   21.4100  144.5000       9.6        86       899        96
VIS    2025250     20200   21.4000  144.4800       9.7        84       899        97
VIS    2025250     20200   21.4100  144.4500      10.0        87       902        94
VIS    2025250     20200   21.4000  144.4300       9.9        83       903        90
VIS    2025250     20200   21.4000  144.4000       9.6        79       903        93
VIS    2025250     20200   21.4000  144.3900       9.6        78       903        94
VIS    2025250     20200   21.4100  144.3700       9.2        75       902        96
VIS    2025250     20200   21.3900  144.3500       8.7        77       902        98
VIS    2025250     20200   21.3900  144.3100       7.9        77       902        97
VIS    2025250     20200   21.4000  144.3000       7.7        79       902        98
VIS    2025250     20200   21.4000  144.2700       7.6        82       901        98
VIS    2025250     20200   21.3900  144.2300       8.3        80       902        97
VIS    2025250     20200   21.4100  144.2100       8.0        77       904        91
VIS    2025250     20200   21.4000  144.2000       7.8        76       904        93
VIS    2025250     20200   21.3900  144.1700       7.0        77       905        97
VIS    2025250     20200   21.4000  144.1300       7.7        85       906        94
VIS    2025250     20200   21.3900  144.1100       8.3        84       903        96
VIS    2025250     20200   21.3900  144.0800       8.5        84       903        98
VIS    2025250     20200   21.4000  144.0800       8.4        84       904        96
VIS    2025250     20200   21.3800  144.0300       8.7        87       904        97
VIS    2025250     20200   21.3900  144.0300       8.7        87       904        97
VIS    2025250     20200   21.3900  143.9300       9.4        75       905        97
VIS    2025250     20200   21.3900  143.9100       9.3        79       905        98
VIS    2025250     20200   21.4000  143.8900       9.0        80       905        97
VIS    2025250     20200   21.4000  143.8600       8.7        76       907        93
VIS    2025250     20200   21.3900  143.8400       9.2        72       906        91
VIS    2025250     20200   21.3800  143.8200       9.1        80       907        95
VIS    2025250     20200   21.4000  143.7900       8.7        86       908        90
VIS    2025250     20200   21.3800  143.7500       9.0        88       910        92
VIS    2025250     20200   21.3900  143.7100       9.5        91       912        95
VIS    2025250     20200   21.3900  143.7000       9.5        91       912        94
VIS    2025250     20200   21.3900  143.6600       8.5        90       914        91
VIS    2025250     20200   21.3800  143.6400       8.1        85       915        93
VIS    2025250     20200   21.3900  143.3500       9.1        90       919        95
VIS    2025250     20200   21.3800  143.3200       9.3        94       919        90
VIS    2025250     20200   21.3900  143.3100       9.4        93       919        90
VIS    2025250     20200   21.3900  143.2700       9.3        84       919        98
VIS    2025250     20200   21.3900  143.2600       9.5        80       919        98
VIS    2025250     20200   21.3900  143.2300       9.6        78       920        94
VIS    2025250     20200   21.3800  143.2100       9.6        81       920        97
VIS    2025250     20200   21.3900  143.1800       9.4        84       920        99
VIS    2025250     20200   21.3800  143.1600       9.3        86       920        98
VIS    2025250     20200   21.3800  143.1300       9.2        86       920        96
VIS    2025250     20200   21.3800  143.1200       9.2        87       920        96
VIS    2025250     20200   21.3900  143.0800       9.4        89       921        92
VIS    2025250     20200   21.4000  143.0500       9.6        93       921        97
VIS    2025250     20200   21.3800  143.0200       9.4        90       918        96
VIS    2025250     20200   21.3800  143.0200       9.3        90       917        94
VIS    2025250     20200   21.4000  142.9700       9.5        99       917        94
VIS    2025250     20200   21.3800  142.9500       9.4        92       918        94
VIS    2025250     20200   21.3800  142.9300       9.3        89       918        96
VIS    2025250     20200   21.3800  142.9100       9.3        89       919        95
VIS    2025250     20200   21.3800  142.8700       9.6        87       922        91
VIS    2025250     20200   21.3900  142.8700       9.6        87       922        91
VIS    2025250     20200   21.4000  142.8400       9.3        86       924        93
VIS    2025250     20200   21.3800  142.8100       9.3        84       919        94
VIS    2025250     20200   21.4000  142.7900       9.4        81       921        96
VIS    2025250     20200   21.3800  142.7600       9.6        81       920        97
VIS    2025250     20200   21.3800  142.7500       9.5        82       920        97
VIS    2025250     20200   21.3900  142.7000       9.4        85       923        96
VIS    2025250     20200   21.3700  142.6800       9.3        85       923        93
VIS    2025250     20200   21.3900  142.6600       9.5        84       923        94
VIS    2025250     20200   21.3700  142.6300       9.8        79       922        95
VIS    2025250     20200   21.3800  142.6100      10.0        76       922        95
VIS    2025250     20200   21.3700  142.6000      10.1        76       922        96
VIS    2025250     20200   21.3700  142.5500       9.8        77       922        97
VIS    2025250     20200   21.3800  142.5400      10.0        75       922        97
VIS    2025250     20200   21.3800  142.5100       9.9        74       923        96
VIS    2025250     20200   21.3800  142.4900       9.9        75       923        95
VIS    2025250     20200   21.3900  142.4600       9.6        76       923        91
VIS    2025250     20200   21.3900  142.4400       9.5        78       924        97
VIS    2025250     20200   21.3900  142.4100       9.3        81       924        97
VIS    2025250     20200   21.3700  142.3900       9.2        83       936        96
VIS    2025250     20200   21.3700  142.3700       9.2        82       953        93
VIS    2025250     20200   21.3900  142.3400       9.6        80       977        94
VIS    2025250     20200   21.3700  142.3100       9.6        82       971        92
VIS    2025250     20200   21.3800  142.3000       9.4        82       971        94
VIS    2025250     20200   21.3900  142.2600       9.7        82       928        99
VIS    2025250     20200   21.3700  142.2500      10.0        78       923        97
VIS    2025250     20200   21.3900  142.2200       9.6        78       923        97
VIS    2025250     20200   21.3900  142.2000       9.4        79       922        97
VIS    2025250     20200   21.3900  142.1600       9.7        79       923        98
VIS    2025250     20200   21.3800  142.1500       9.6        79       922        96
VIS    2025250     20200   21.3800  142.1300       9.6        79       922        96
VIS    2025250     20200   21.3800  142.0900       9.6        81       923        96
VIS    2025250     20200   21.3800  142.0400      10.0        83       925        97
VIS    2025250     20200   21.3800  142.0200      10.3        78       926        96
VIS    2025250     20200   21.3800  142.0000      10.3        78       925        95
VIS    2025250     20200   21.3800  141.9700       9.8        80       925        98
VIS    2025250     20200   21.3900  141.9500       9.6        78       925        97
VIS    2025250     20200   21.3700  141.9300       8.9        80       926        90
VIS    2025250     20200   21.3800  141.8900       9.1        77       928        93
VIS    2025250     20200   21.3700  140.4900      10.3        83       974        97
VIS    2025250     20200   21.3700  140.4700      10.1        83       973        96
VIS    2025250     20200   21.3600  140.4500      10.3        83       973        96
VIS    2025250     20200   21.3700  140.4200      10.0        82       968        94
VIS    2025250     20200   21.4000  148.2700       6.5        82       997        93
VIS    2025250     20200   21.3900  146.5000       6.9        70       967        90
VIS    2025250     20200   21.3900  146.4900       6.4        69       940        94
VIS    2025250     20200   21.3700  145.3000       8.4        85       979        92
VIS    2025250     20200   21.3800  145.2800       8.8        89       965        92
VIS    2025250     20200   21.3800  145.2500       9.5        86       949        93
VIS    2025250     20200   21.3700  145.2400       9.4        86       949        91
VIS    2025250     20200   21.3700  145.2000       8.0        84       952        92
VIS    2025250     20200   21.3900  145.1900       7.3        86       952        90
VIS    2025250     20200   21.3700  145.1700       7.9        85       929        96
VIS    2025250     20200   21.3700  145.1400       8.2        85       910        99
VIS    2025250     20200   21.3900  145.1000       8.2        82       906        99
VIS    2025250     20200   21.3900  145.0900       8.4        82       906        98
VIS    2025250     20200   21.3700  145.0600       9.0        89       900        93
VIS    2025250     20200   21.3800  145.0300       8.9        86       899        96
VIS    2025250     20200   21.3800  145.0200       8.8        86       899        97
VIS    2025250     20200   21.3800  144.9800       9.2        90       895        94
VIS    2025250     20200   21.3800  144.9500       9.6        88       895        93
VIS    2025250     20200   21.3800  144.9400       9.6        88       895        93
VIS    2025250     20200   21.3900  144.9200       9.9        86       895        93
VIS    2025250     20200   21.3800  144.8800      10.1        83       897        91
VIS    2025250     20200   21.3700  144.8600       9.9        79       898        93
VIS    2025250     20200   21.3800  144.8500       9.6        76       898        95
VIS    2025250     20200   21.3900  144.8200       8.9        79       896        97
VIS    2025250     20200   21.3700  144.7900       8.3        87       893        98
VIS    2025250     20200   21.3800  144.7500       8.4        86       894        98
VIS    2025250     20200   21.3700  144.7500       8.6        86       895        98
VIS    2025250     20200   21.3600  144.7000       8.6        84       896        98
VIS    2025250     20200   21.3800  144.7000       8.8        84       897        96
VIS    2025250     20200   21.3600  144.6500       9.3        80       898        96
VIS    2025250     20200   21.3600  144.6400       9.4        79       900        96
VIS    2025250     20200   21.3700  144.6200       9.2        77       900        96
VIS    2025250     20200   21.3800  144.5800       9.1        80       899        98
VIS    2025250     20200   21.3800  144.5700       9.1        82       899        98
VIS    2025250     20200   21.3600  144.5400       9.3        82       898        98
VIS    2025250     20200   21.3700  144.5200       9.3        82       897        96
VIS    2025250     20200   21.3800  144.4800       9.7        83       901        96
VIS    2025250     20200   21.3600  144.4700       9.7        81       901        90
VIS    2025250     20200   21.3600  144.4300       9.6        82       903        92
VIS    2025250     20200   21.3800  144.4000       9.7        77       903        94
VIS    2025250     20200   21.3700  144.4000       9.8        76       902        95
VIS    2025250     20200   21.3700  144.3700       9.3        77       902        96
VIS    2025250     20200   21.3600  144.3500       8.8        79       901        97
VIS    2025250     20200   21.3800  144.3200       8.1        77       901        97
VIS    2025250     20200   21.3700  144.2900       7.5        75       900        97
VIS    2025250     20200   21.3700  144.2700       7.4        76       900        98
VIS    2025250     20200   21.3600  144.2400       7.9        79       902        97
VIS    2025250     20200   21.3800  144.2200       8.1        79       902        97
VIS    2025250     20200   21.3800  144.1900       7.3        74       902        96
VIS    2025250     20200   21.3800  144.1700       7.0        77       904        97
VIS    2025250     20200   21.3700  144.1500       7.3        81       904        98
VIS    2025250     20200   21.3700  144.1200       8.0        84       902        99
VIS    2025250     20200   21.3800  144.1000       8.3        84       903        99
VIS    2025250     20200   21.3800  144.0700       8.5        83       903        99
VIS    2025250     20200   21.3700  144.0500       8.5        86       903        98
VIS    2025250     20200   21.3700  143.9400       9.6        70       905        94
VIS    2025250     20200   21.3800  143.9200       9.5        75       905        97
VIS    2025250     20200   21.3600  143.8900       9.6        76       905        90
VIS    2025250     20200   21.3700  143.8100       9.1        81       908        95
VIS    2025250     20200   21.3600  143.7500       9.4        85       911        94
VIS    2025250     20200   21.3700  143.7100       9.3        84       913        98
VIS    2025250     20200   21.3700  143.7000       9.3        86       913        95
VIS    2025250     20200   21.3600  143.6300       8.0        79       915        94
VIS    2025250     20200   21.3800  143.6300       7.9        85       915        92
VIS    2025250     20200   21.3500  143.3700      10.1        94       921        91
VIS    2025250     20200   21.3700  143.3600       9.6        92       921        94
VIS    2025250     20200   21.3600  143.3300       9.5        94       920        91
VIS    2025250     20200   21.3600  143.3000       9.3        89       920        97
VIS    2025250     20200   21.3600  143.2700       9.4        82       919        98
VIS    2025250     20200   21.3500  143.2500       9.7        78       919        97
VIS    2025250     20200   21.3700  143.2300       9.7        79       920        97
VIS    2025250     20200   21.3600  143.2000       9.6        79       919        98
VIS    2025250     20200   21.3600  143.1900       9.5        81       919        99
VIS    2025250     20200   21.3700  143.1600       9.4        87       920        99
VIS    2025250     20200   21.3700  143.1300       9.3        86       919        96
VIS    2025250     20200   21.3700  143.1100       9.2        86       919        95
VIS    2025250     20200   21.3600  143.0900       9.2        85       919        96
VIS    2025250     20200   21.3700  143.0500       9.1        84       919        96
VIS    2025250     20200   21.3500  143.0400       9.2        84       917        93
VIS    2025250     20200   21.3500  143.0000       9.3        91       917        94
VIS    2025250     20200   21.3600  142.9900       9.4        92       917        95
VIS    2025250     20200   21.3700  142.9500       9.3        92       918        94
VIS    2025250     20200   21.3700  142.9400       9.2        91       918        94
VIS    2025250     20200   21.3600  142.9100       9.2        92       920        92
VIS    2025250     20200   21.3700  142.8800       9.7        89       922        94
VIS    2025250     20200   21.3700  142.8700       9.7        86       922        93
VIS    2025250     20200   21.3600  142.8400       9.7        84       918        95
VIS    2025250     20200   21.3700  142.8200       9.3        84       919        93
VIS    2025250     20200   21.3600  142.7800       9.6        87       919        95
VIS    2025250     20200   21.3600  142.7700       9.7        86       919        97
VIS    2025250     20200   21.3700  142.7400       9.5        83       920        97
VIS    2025250     20200   21.3600  142.7000       9.3        84       920        95
VIS    2025250     20200   21.3500  142.6800       9.2        84       921        93
VIS    2025250     20200   21.3700  142.6500       9.4        84       922        94
VIS    2025250     20200   21.3600  142.6400       9.5        82       922        96
VIS    2025250     20200   21.3500  142.6000       9.9        79       922        96
VIS    2025250     20200   21.3500  142.5900       9.8        78       922        97
VIS    2025250     20200   21.3600  142.5500       9.8        77       922        97
VIS    2025250     20200   21.3700  142.5500       9.9        77       922        97
VIS    2025250     20200   21.3700  142.5200      10.1        73       922        95
VIS    2025250     20200   21.3600  142.5000      10.0        74       923        96
VIS    2025250     20200   21.3500  142.4600       9.5        78       923        96
VIS    2025250     20200   21.3500  142.4300       9.4        81       926        95
VIS    2025250     20200   21.3500  142.4100       9.6        82       930        97
VIS    2025250     20200   21.3500  142.3800       9.4        82       953        96
VIS    2025250     20200   21.3500  142.3700       9.4        82       965        95
VIS    2025250     20200   21.3500  142.3500       9.3        82       968        94
VIS    2025250     20200   21.3700  142.3100       9.6        82       966        90
VIS    2025250     20200   21.3700  142.3000       9.6        81       951        93
VIS    2025250     20200   21.3600  142.2600      10.0        77       924        98
VIS    2025250     20200   21.3700  142.2500       9.9        78       923        97
VIS    2025250     20200   21.3600  142.2200       9.4        80       922        97
VIS    2025250     20200   21.3500  142.2000       9.4        81       922        96
VIS    2025250     20200   21.3600  142.1800       9.5        80       923        97
VIS    2025250     20200   21.3500  142.1500       9.2        80       924        96
VIS    2025250     20200   21.3700  142.1200       9.6        79       922        95
VIS    2025250     20200   21.3700  142.0500       9.9        86       926        97
VIS    2025250     20200   21.3700  142.0100      10.7        75       934        97
VIS    2025250     20200   21.3600  142.0000      11.2        76       936        98
VIS    2025250     20200   21.3500  140.4500      10.2        82       972        96
VIS    2025250     20200   21.3600  140.4400      10.1        82       971        97
VIS    2025250     20200   21.4000  148.2700       6.4        81       997        91
VIS    2025250     20200   21.3700  147.8400       5.6        90       978        93
VIS    2025250     20200   21.3800  147.8300       5.4        88       978        95
VIS    2025250     20200   21.3700  147.5800       5.1        84       985        91
VIS    2025250     20200   21.3700  146.5000       6.5        80       940        93
VIS    2025250     20200   21.3500  145.3100       8.1        85       979        97
VIS    2025250     20200   21.3400  145.2700       7.6        88       956        94
VIS    2025250     20200   21.3500  145.2500       9.0        90       945        91
VIS    2025250     20200   21.3600  145.2200       9.0        85       949        92
VIS    2025250     20200   21.3500  145.2100       8.7        86       945        95
VIS    2025250     20200   21.3400  145.1900       8.3        87       929        97
VIS    2025250     20200   21.3400  145.1500       8.6        87       920        97
VIS    2025250     20200   21.3600  145.1400       8.3        86       908        98
VIS    2025250     20200   21.3500  145.1000       8.0        85       899        97
VIS    2025250     20200   21.3600  145.0800       8.7        89       899        92
VIS    2025250     20200   21.3600  145.0200       9.1        90       899        93
VIS    2025250     20200   21.3500  145.0000       9.0        91       896        94
VIS    2025250     20200   21.3500  144.9800       9.2        87       896        93
VIS    2025250     20200   21.3600  144.9600       9.5        85       896        95
VIS    2025250     20200   21.3500  144.9300       9.9        86       896        94
VIS    2025250     20200   21.3600  144.9100      10.1        84       896        94
VIS    2025250     20200   21.3600  144.8900      10.0        84       897        92
VIS    2025250     20200   21.3400  144.8500       9.6        75       899        94
VIS    2025250     20200   21.3500  144.8400       9.5        76       898        94
VIS    2025250     20200   21.3600  144.8200       8.7        80       896        97
VIS    2025250     20200   21.3500  144.7800       8.2        86       893        98
VIS    2025250     20200   21.3600  144.7500       8.7        87       894        98
VIS    2025250     20200   21.3500  144.7400       8.7        88       895        96
VIS    2025250     20200   21.3500  144.7000       8.6        85       896        98
VIS    2025250     20200   21.3500  144.6800       9.0        82       896        98
VIS    2025250     20200   21.3400  144.6600       9.1        81       896        98
VIS    2025250     20200   21.3600  144.6500       9.3        80       898        97
VIS    2025250     20200   21.3400  144.6200       9.2        78       900        98
VIS    2025250     20200   21.3600  144.5800       9.1        79       899        98
VIS    2025250     20200   21.3500  144.5700       9.1        78       899        97
VIS    2025250     20200   21.3600  144.5500       9.3        82       899        98
VIS    2025250     20200   21.3400  144.5200       9.3        82       898        98
VIS    2025250     20200   21.3400  144.4800       9.4        79       899        94
VIS    2025250     20200   21.3400  144.4700       9.5        80       902        91
VIS    2025250     20200   21.3600  144.4300       9.6        82       903        93
VIS    2025250     20200   21.3600  144.4200       9.6        81       902        95
VIS    2025250     20200   21.3600  144.4000       9.7        77       902        96
VIS    2025250     20200   21.3600  144.3600       9.0        79       901        97
VIS    2025250     20200   21.3400  144.3400       8.8        77       900        98
VIS    2025250     20200   21.3600  144.3200       8.1        76       901        98
VIS    2025250     20200   21.3500  144.2800       7.6        74       900        97
VIS    2025250     20200   21.3400  144.2600       7.8        77       901        97
VIS    2025250     20200   21.3400  144.2300       7.7        78       902        98
VIS    2025250     20200   21.3300  144.2100       7.6        78       902        98
VIS    2025250     20200   21.3500  144.1900       7.6        77       902        98
VIS    2025250     20200   21.3300  144.1500       7.8        81       902        99
VIS    2025250     20200   21.3500  144.1500       7.7        82       903        98
VIS    2025250     20200   21.3300  144.1100       8.4        82       902       100
VIS    2025250     20200   21.3500  144.0800       8.5        81       902        99
VIS    2025250     20200   21.3500  144.0600       8.4        84       903        97
VIS    2025250     20200   21.3400  144.0400       8.7        86       903        90
VIS    2025250     20200   21.3300  144.0000       9.2        84       904        90
VIS    2025250     20200   21.3300  143.9800       9.6        81       905        94
VIS    2025250     20200   21.3400  143.9700       9.6        80       906        94
VIS    2025250     20200   21.3400  143.8100       9.3        81       910        93
VIS    2025250     20200   21.3500  143.8000       9.2        83       909        93
VIS    2025250     20200   21.3400  143.7800       9.5        83       911        93
VIS    2025250     20200   21.3300  143.7500       9.6        79       913        97
VIS    2025250     20200   21.3300  143.7100       9.4        79       914        96
VIS    2025250     20200   21.3300  143.7000       9.3        77       915        94
VIS    2025250     20200   21.3400  143.6600       8.8        75       916        92
VIS    2025250     20200   21.3300  143.6400       8.6        79       916        95
VIS    2025250     20200   21.3500  143.6300       8.1        80       916        95
VIS    2025250     20200   21.3400  143.3900       9.9        92       924        93
VIS    2025250     20200   21.3400  143.3500       9.9        94       921        91
VIS    2025250     20200   21.3300  143.3400       9.7        94       921        91
VIS    2025250     20200   21.3300  143.3000       9.2        87       920        93
VIS    2025250     20200   21.3300  143.3000       9.3        86       920        94
VIS    2025250     20200   21.3400  143.2600       9.7        77       919        97
VIS    2025250     20200   21.3300  143.2300       9.9        74       920        95
VIS    2025250     20200   21.3400  143.2000       9.9        74       919        96
VIS    2025250     20200   21.3400  143.1900       9.7        76       919        97
VIS    2025250     20200   21.3300  143.1600       9.4        81       918        98
VIS    2025250     20200   21.3400  143.1300       9.3        83       918        95
VIS    2025250     20200   21.3400  143.1200       9.3        81       918        94
VIS    2025250     20200   21.3300  143.0900       9.3        81       917        97
VIS    2025250     20200   21.3300  143.0700       9.2        83       917        96
VIS    2025250     20200   21.3300  143.0400       9.5        84       917        95
VIS    2025250     20200   21.3300  143.0200       9.4        87       917        94
VIS    2025250     20200   21.3300  142.9900       9.2        89       917        95
VIS    2025250     20200   21.3300  142.9800       9.3        90       917        96
VIS    2025250     20200   21.3300  142.9500       9.4        91       917        96
VIS    2025250     20200   21.3300  142.9300       9.2        91       918        94
VIS    2025250     20200   21.3400  142.8900       9.4        88       918        93
VIS    2025250     20200   21.3300  142.8600       9.6        87       917        96
VIS    2025250     20200   21.3200  142.8400       9.6        88       917        97
VIS    2025250     20200   21.3300  142.8200       9.5        88       917        97
VIS    2025250     20200   21.3300  142.7900       9.8        89       918        98
VIS    2025250     20200   21.3300  142.7600      10.1        85       919        98
VIS    2025250     20200   21.3300  142.7300       9.8        82       920        97
VIS    2025250     20200   21.3400  142.7100       9.2        82       920        96
VIS    2025250     20200   21.3400  142.6800       9.2        82       921        95
VIS    2025250     20200   21.3400  142.6600       9.3        83       921        94
VIS    2025250     20200   21.3400  142.6500       9.4        83       921        96
VIS    2025250     20200   21.3400  142.6300       9.5        81       922        97
VIS    2025250     20200   21.3400  142.6000       9.7        79       922        96
VIS    2025250     20200   21.3300  142.5700       9.7        77       922        98
VIS    2025250     20200   21.3400  142.5500       9.8        78       922        97
VIS    2025250     20200   21.3400  142.4600       9.3        80       929        97
VIS    2025250     20200   21.3300  142.4500       9.5        81       939        96
VIS    2025250     20200   21.3400  142.4100       9.6        82       930        97
VIS    2025250     20200   21.3400  142.4100       9.7        82       936        98
VIS    2025250     20200   21.3400  142.3800       9.4        82       965        96
VIS    2025250     20200   21.3400  142.3500       9.2        83       968        93
VIS    2025250     20200   21.3300  142.3100       9.6        83       940        98
VIS    2025250     20200   21.3400  142.3100       9.8        82       940        98
VIS    2025250     20200   21.3200  142.2600       9.8        80       923        97
VIS    2025250     20200   21.3300  142.2600       9.8        80       923        98
VIS    2025250     20200   21.3400  142.2300       9.4        81       922        97
VIS    2025250     20200   21.3400  142.1900       9.4        80       923        95
VIS    2025250     20200   21.3300  142.1900       9.5        79       925        95
VIS    2025250     20200   21.3400  142.1600       9.2        80       924        96
VIS    2025250     20200   21.3400  141.8800       9.4        79       935        98
VIS    2025250     20200   21.3400  141.8700       9.5        77       935        96
VIS    2025250     20200   21.3200  141.8200       8.7        75       969        91
VIS    2025250     20200   21.3200  141.8000       9.8        75       969        97
VIS    2025250     20200   21.3200  141.7900      10.4        74       965        98
VIS    2025250     20200   21.3200  141.3600      10.0        80       976        98
VIS    2025250     20200   21.3200  141.3300       9.7        79       974        98
VIS    2025250     20200   21.3200  141.3100       9.5        81       974        98
VIS    2025250     20200   21.3300  141.2800       9.5        83       973        96
VIS    2025250     20200   21.3200  140.4600      10.2        81       973        94
VIS    2025250     20200   21.3200  140.4500      10.1        81       971        95
VIS    2025250     20200   21.3200  140.4200       9.9        82       967        99
VIS    2025250     20200   21.3700  147.8400       5.7        88       978        91
VIS    2025250     20200   21.3600  147.8300       5.6        87       978        94
VIS    2025250     20200   21.3600  147.5800       5.3        85       985        95
VIS    2025250     20200   21.3400  146.5200       7.0        87       967        96
VIS    2025250     20200   21.3400  146.5100       6.8        88       967        97
VIS    2025250     20200   21.3200  145.3200       8.0        86       979        95
VIS    2025250     20200   21.3200  145.3100       7.9        85       979        95
VIS    2025250     20200   21.3300  145.2800       7.2        87       956        92
VIS    2025250     20200   21.3200  145.2500       7.8        92       950        93
VIS    2025250     20200   21.3200  145.2300       8.7        88       950        96
VIS    2025250     20200   21.3200  145.2100       8.9        88       945        95
VIS    2025250     20200   21.3400  145.1700       8.6        88       928        97
VIS    2025250     20200   21.3300  145.1500       8.6        87       910        97
VIS    2025250     20200   21.3200  145.1400       8.4        85       900        98
VIS    2025250     20200   21.3200  145.1000       7.7        82       896        97
VIS    2025250     20200   21.3300  145.0900       7.9        85       897        96
VIS    2025250     20200   21.3400  145.0500       9.2        93       895        90
VIS    2025250     20200   21.3300  145.0400       9.1        92       895        92
VIS    2025250     20200   21.3400  145.0100       9.0        91       896        94
VIS    2025250     20200   21.3200  144.9900       9.2        90       897        90
VIS    2025250     20200   21.3200  144.9500       9.5        89       897        90
VIS    2025250     20200   21.3200  144.9400       9.6        89       897        91
VIS    2025250     20200   21.3200  144.9000      10.0        82       897        92
VIS    2025250     20200   21.3200  144.8700       9.9        76       898        91
VIS    2025250     20200   21.3300  144.8500       9.5        75       899        95
VIS    2025250     20200   21.3200  144.8400       9.2        76       898        96
VIS    2025250     20200   21.3200  144.8200       8.1        85       897        95
VIS    2025250     20200   21.3300  144.7700       8.2        84       893        97
VIS    2025250     20200   21.3200  144.7700       8.3        84       893        98
VIS    2025250     20200   21.3100  144.7200       8.1        87       895        98
VIS    2025250     20200   21.3300  144.7100       8.2        86       895        99
VIS    2025250     20200   21.3300  144.6900       8.5        84       896        99
VIS    2025250     20200   21.3300  144.6500       9.2        82       896        98
VIS    2025250     20200   21.3300  144.6300       9.3        79       898        98
VIS    2025250     20200   21.3200  144.6000       9.1        78       898        95
VIS    2025250     20200   21.3300  144.5700       9.2        78       899        97
VIS    2025250     20200   21.3200  144.5600       9.1        79       899        97
VIS    2025250     20200   21.3200  144.5300       9.2        80       899        97
VIS    2025250     20200   21.3200  144.5200       9.3        82       899        97
VIS    2025250     20200   21.3300  144.4900       9.5        79       899        93
VIS    2025250     20200   21.3200  144.4500       9.8        80       903        90
VIS    2025250     20200   21.3300  144.4300       9.7        81       903        95
VIS    2025250     20200   21.3300  144.4200       9.6        81       903        95
VIS    2025250     20200   21.3300  144.4000       9.5        79       902        95
VIS    2025250     20200   21.3300  144.3500       9.1        76       901        97
VIS    2025250     20200   21.3200  144.3300       8.3        73       900        98
VIS    2025250     20200   21.3300  144.3200       8.2        73       901        98
VIS    2025250     20200   21.3100  144.2900       7.7        74       901        98
VIS    2025250     20200   21.3100  144.2600       7.8        77       901        98
VIS    2025250     20200   21.3200  144.2300       7.7        77       903        99
VIS    2025250     20200   21.3300  144.2100       7.6        78       902        99
VIS    2025250     20200   21.3100  144.1800       8.1        81       902       100
VIS    2025250     20200   21.3300  144.1700       7.8        79       902        99
VIS    2025250     20200   21.3200  144.1500       7.9        80       902        99
VIS    2025250     20200   21.3300  144.1000       8.5        82       902       100
VIS    2025250     20200   21.3200  144.0900       8.8        81       902        99
VIS    2025250     20200   21.3200  144.0700       8.8        81       903        96
VIS    2025250     20200   21.3100  144.0300       9.2        82       904        94
VIS    2025250     20200   21.3100  144.0100       9.5        81       904        97
VIS    2025250     20200   21.3200  143.9800       9.6        82       905        96
VIS    2025250     20200   21.3200  143.9600       9.6        78       905        97
VIS    2025250     20200   21.3200  143.9300       9.6        75       907        94
VIS    2025250     20200   21.3100  143.9200       9.6        76       907        91
VIS    2025250     20200   21.3200  143.8900       9.8        79       907        93
VIS    2025250     20200   21.3100  143.8500       9.2        79       910        98
VIS    2025250     20200   21.3100  143.8300       9.1        75       911        98
VIS    2025250     20200   21.3200  143.8200       9.2        75       910        97
VIS    2025250     20200   21.3100  143.7800       9.8        78       911        97
VIS    2025250     20200   21.3100  143.7700      10.0        78       913        96
VIS    2025250     20200   21.3300  143.7400       9.5        78       914        97
VIS    2025250     20200   21.3200  143.7200       9.3        79       915        95
VIS    2025250     20200   21.3100  143.6800       9.6        74       916        95
VIS    2025250     20200   21.3100  143.6800       9.6        74       916        95
VIS    2025250     20200   21.3300  143.6300       8.7        81       917        96
VIS    2025250     20200   21.3200  143.4300       9.1        85       934        98
VIS    2025250     20200   21.3200  143.4200       9.3        85       923        98
VIS    2025250     20200   21.3200  143.3900       9.7        87       921        98
VIS    2025250     20200   21.3100  143.3600       9.6        92       921        93
VIS    2025250     20200   21.3200  143.3500       9.7        93       921        92
VIS    2025250     20200   21.3000  143.3000       9.3        83       920        92
VIS    2025250     20200   21.3100  143.2900       9.2        82       920        95
VIS    2025250     20200   21.3100  143.2500       9.6        77       919        98
VIS    2025250     20200   21.3100  143.2500       9.6        76       919        98
VIS    2025250     20200   21.3200  143.2100       9.8        73       920        92
VIS    2025250     20200   21.3100  143.1800       9.6        78       918        93
VIS    2025250     20200   21.3200  143.1600       9.4        82       918        97
VIS    2025250     20200   21.3000  143.1300       9.1        82       915        98
VIS    2025250     20200   21.3100  143.1200       9.2        81       915        98
VIS    2025250     20200   21.3100  143.0800       9.3        83       915        96
VIS    2025250     20200   21.3000  143.0700       9.4        83       915        96
VIS    2025250     20200   21.3200  143.0400       9.3        85       916        94
VIS    2025250     20200   21.3200  143.0100       9.1        85       916        94
VIS    2025250     20200   21.3200  142.9900       9.1        87       917        93
VIS    2025250     20200   21.3100  142.9600       9.2        89       916        95
VIS    2025250     20200   21.3100  142.9500       9.3        91       916        96
VIS    2025250     20200   21.3200  142.9100       9.4        90       917        95
VIS    2025250     20200   21.3100  142.8900       9.5        90       917        95
VIS    2025250     20200   21.3200  142.8600       9.6        89       917        96
VIS    2025250     20200   21.3200  142.8400       9.5        89       917        97
VIS    2025250     20200   21.3100  142.8100       9.6        88       917        97
VIS    2025250     20200   21.3000  142.7900       9.8        85       919        98
VIS    2025250     20200   21.3000  142.7700      10.0        82       919        97
VIS    2025250     20200   21.3000  142.7300       9.8        83       920        96
VIS    2025250     20200   21.3000  142.7300       9.6        84       920        94
VIS    2025250     20200   21.3000  142.7000       9.1        84       921        91
VIS    2025250     20200   21.3200  142.6600       9.3        80       921        96
VIS    2025250     20200   21.3200  142.6500       9.2        81       921        97
VIS    2025250     20200   21.3200  142.6200       9.3        81       922        97
VIS    2025250     20200   21.3100  142.5800       9.4        79       923        97
VIS    2025250     20200   21.3200  142.4800       9.4        81       934        98
VIS    2025250     20200   21.3000  142.4400      10.2        83       940        98
VIS    2025250     20200   21.3100  142.4100      10.3        83       940        99
VIS    2025250     20200   21.3200  142.4000      10.1        83       940        99
VIS    2025250     20200   21.3100  142.3700       8.9        82       952        92
VIS    2025250     20200   21.3100  142.3600       8.8        83       965        91
VIS    2025250     20200   21.3200  142.3200       9.2        84       940        99
VIS    2025250     20200   21.3000  142.3100       9.6        83       925        99
VIS    2025250     20200   21.3000  142.2700       9.7        80       925        97
VIS    2025250     20200   21.3000  142.2600       9.5        80       925        98
VIS    2025250     20200   21.3000  142.2100       9.5        79       926        96
VIS    2025250     20200   21.3000  142.1800       9.6        80       927        96
VIS    2025250     20200   21.3000  141.8400       9.6        72       976        94
VIS    2025250     20200   21.2900  141.8200       9.8        75       969        98
VIS    2025250     20200   21.3100  141.8000       9.9        75       951        98
VIS    2025250     20200   21.3100  141.4200       9.3        86       968        94
VIS    2025250     20200   21.2900  141.4000      10.1        82       958       100
VIS    2025250     20200   21.2900  141.3900      10.1        81       958        99
VIS    2025250     20200   21.2900  141.3600       9.8        79       958        99
VIS    2025250     20200   21.3000  141.3400       9.8        78       959        99
VIS    2025250     20200   21.3000  141.3000       9.7        81       973        99
VIS    2025250     20200   21.3100  141.2900       9.7        81       973        98
VIS    2025250     20200   21.2900  140.4900      10.5        79       963       100
VIS    2025250     20200   21.2900  140.4800      10.5        79       963        99
VIS    2025250     20200   21.2900  140.4600      10.5        79       963        99
VIS    2025250     20200   21.3000  140.4300      10.0        81       961       100
VIS    2025250     20200   21.3400  147.8100       4.6        79       962        92
VIS    2025250     20200   21.3100  146.5400       6.8        81       975        92
VIS    2025250     20200   21.3200  146.5200       6.7        85       974        97
VIS    2025250     20200   21.3100  145.3200       8.1        87       980        93
VIS    2025250     20200   21.2900  145.2800       7.8        91       974        92
VIS    2025250     20200   21.3100  145.2500       8.2        91       954        95
VIS    2025250     20200   21.3100  145.2200       8.9        89       950        96
VIS    2025250     20200   21.3000  145.2100       8.8        89       950        96
VIS    2025250     20200   21.3100  145.1800       8.6        88       928        97
VIS    2025250     20200   21.3100  145.1600       8.6        86       909        98
VIS    2025250     20200   21.3000  145.1200       8.2        82       896        99
VIS    2025250     20200   21.3100  145.1000       7.7        82       895        98
VIS    2025250     20200   21.3000  145.0800       7.9        84       895        98
VIS    2025250     20200   21.2900  145.0600       8.0        87       896        98
VIS    2025250     20200   21.3100  145.0300       8.6        90       896        96
VIS    2025250     20200   21.3100  145.0000       8.8        89       897        95
VIS    2025250     20200   21.3100  144.9800       9.6        90       898        90
VIS    2025250     20200   21.3000  144.9500       9.8        89       898        90
VIS    2025250     20200   21.3000  144.9200       9.6        85       897        91
VIS    2025250     20200   21.3100  144.9000       9.9        81       897        91
VIS    2025250     20200   21.3100  144.8800       9.9        75       898        90
VIS    2025250     20200   21.3100  144.8600       9.9        72       898        92
VIS    2025250     20200   21.3000  144.8400       9.2        76       897        95
VIS    2025250     20200   21.3000  144.7900       8.0        86       894        96
VIS    2025250     20200   21.3100  144.7600       8.5        84       894        98
VIS    2025250     20200   21.2900  144.7400       8.5        84       894        99
VIS    2025250     20200   21.3100  144.7000       8.2        84       895        99
VIS    2025250     20200   21.2900  144.6800       8.9        83       895        98
VIS    2025250     20200   21.2900  144.6500       9.2        83       895        98
VIS    2025250     20200   21.2900  144.6300       9.3        83       896        98
VIS    2025250     20200   21.2900  144.6000       9.3        81       898        97
VIS    2025250     20200   21.2900  144.5900       9.2        81       898        97
VIS    2025250     20200   21.3000  144.5500       8.7        80       899        96
VIS    2025250     20200   21.2900  144.5400       8.7        80       899        97
VIS    2025250     20200   21.3000  144.5000       9.3        80       899        95
VIS    2025250     20200   21.3000  144.4800       9.4        82       900        96
VIS    2025250     20200   21.3000  144.4200       9.6        78       903        95
VIS    2025250     20200   21.3000  144.4100       9.5        77       903        96
VIS    2025250     20200   21.3000  144.3900       9.3        76       902        97
VIS    2025250     20200   21.2900  144.3600       8.6        76       902        98
VIS    2025250     20200   21.3000  144.3400       8.4        76       902        98
VIS    2025250     20200   21.3100  144.3100       8.0        73       900        98
VIS    2025250     20200   21.3000  144.2700       7.7        76       901        98
VIS    2025250     20200   21.3000  144.2500       7.7        77       902        98
VIS    2025250     20200   21.2900  144.2300       7.8        79       902        99
VIS    2025250     20200   21.3000  144.2200       8.0        79       902        99
VIS    2025250     20200   21.2800  144.1800       8.4        84       902       100
VIS    2025250     20200   21.2900  144.1500       8.0        80       902       100
VIS    2025250     20200   21.3000  144.1500       8.0        80       902       100
VIS    2025250     20200   21.2900  144.1200       8.7        81       902        99
VIS    2025250     20200   21.2900  144.0800       9.2        81       902        96
VIS    2025250     20200   21.2800  144.0700       9.3        80       902        95
VIS    2025250     20200   21.3000  144.0400       9.2        81       903        97
VIS    2025250     20200   21.2900  144.0100       9.5        78       905        97
VIS    2025250     20200   21.2900  143.9900       9.6        77       905        97
VIS    2025250     20200   21.2900  143.9700       9.5        78       905        98
VIS    2025250     20200   21.3000  143.9400       9.5        75       906        95
VIS    2025250     20200   21.2900  143.9100       9.6        75       907        94
VIS    2025250     20200   21.2900  143.8800       9.5        77       908        97
VIS    2025250     20200   21.3000  143.8500       9.0        77       910        99
VIS    2025250     20200   21.3000  143.8300       8.8        75       911        98
VIS    2025250     20200   21.2800  143.8100       8.7        77       911        98
VIS    2025250     20200   21.3000  143.7800       9.9        78       911        96
VIS    2025250     20200   21.2900  143.7700       9.9        79       914        97
VIS    2025250     20200   21.3000  143.6800       9.7        75       916        95
VIS    2025250     20200   21.3000  143.6800       9.8        75       917        95
VIS    2025250     20200   21.3000  143.4700       9.3        90       945        93
VIS    2025250     20200   21.2900  143.4400       9.4        86       922        98
VIS    2025250     20200   21.2900  143.4300       9.4        83       921        98
VIS    2025250     20200   21.3000  143.4000       9.4        84       920        96
VIS    2025250     20200   21.3000  143.3600       9.5        91       921        94
VIS    2025250     20200   21.2900  143.3500       9.5        91       920        95
VIS    2025250     20200   21.2800  143.3200       9.6        87       920        98
VIS    2025250     20200   21.2900  143.2800       9.4        79       919        97
VIS    2025250     20200   21.2900  143.2600       9.6        78       919        97
VIS    2025250     20200   21.2900  143.2400       9.5        80       919        99
VIS    2025250     20200   21.2900  143.2300       9.5        80       918        99
VIS    2025250     20200   21.2800  143.1800      10.0        80       915        98
VIS    2025250     20200   21.2800  143.1800      10.0        80       915        98
VIS    2025250     20200   21.3000  143.1600       9.5        81       916        99
VIS    2025250     20200   21.2900  143.1200       9.2        83       915        97
VIS    2025250     20200   21.2900  143.1100       9.2        82       915        98
VIS    2025250     20200   21.2800  143.0800       9.3        84       915        96
VIS    2025250     20200   21.2900  143.0600       9.4        85       915        94
VIS    2025250     20200   21.2800  143.0200       9.1        88       915        94
VIS    2025250     20200   21.2800  143.0000       9.0        87       915        93
VIS    2025250     20200   21.2900  142.9600       9.1        90       916        94
VIS    2025250     20200   21.2700  142.9400       9.4        92       916        97
VIS    2025250     20200   21.2700  142.9200       9.4        93       916        95
VIS    2025250     20200   21.2700  142.9100       9.5        94       916        92
VIS    2025250     20200   21.2700  142.8600       9.6        93       917        97
VIS    2025250     20200   21.2800  142.8600       9.6        92       917        97
VIS    2025250     20200   21.2800  142.8300       9.5        87       917        97
VIS    2025250     20200   21.2900  142.7900       9.8        83       918        97
VIS    2025250     20200   21.2700  142.7700       9.6        82       919        96
VIS    2025250     20200   21.2700  142.7600       9.6        84       919        94
VIS    2025250     20200   21.2800  142.7400       9.5        84       920        94
VIS    2025250     20200   21.2900  142.6900       9.0        84       921        91
VIS    2025250     20200   21.2900  142.6600       9.0        84       922        96
VIS    2025250     20200   21.2800  142.6200       9.4        78       925        98
VIS    2025250     20200   21.2900  142.4500      10.1        82       944        98
VIS    2025250     20200   21.2900  142.4300      10.3        83       940        97
VIS    2025250     20200   21.2900  142.4200      10.1        84       940        96
VIS    2025250     20200   21.2900  142.3800       9.1        81       952        94
VIS    2025250     20200   21.2900  142.3500       8.9        84       934        95
VIS    2025250     20200   21.2900  142.3300       9.0        85       931        94
VIS    2025250     20200   21.2900  142.3100       9.6        84       926        99
VIS    2025250     20200   21.2800  142.2700       9.7        80       927        97
VIS    2025250     20200   21.2700  142.2500       9.8        77       938        98
VIS    2025250     20200   21.2800  142.2400       9.8        77       929        98
VIS    2025250     20200   21.2800  141.8300       9.9        75       969        98
VIS    2025250     20200   21.2800  141.8200      10.2        76       954        99
VIS    2025250     20200   21.2800  141.7300      10.4        85       947        99
VIS    2025250     20200   21.2700  141.7000      10.7        84       987        92
VIS    2025250     20200   21.2700  141.5000      11.1        77       996        98
VIS    2025250     20200   21.2700  141.4800      11.6        79       996        99
VIS    2025250     20200   21.2700  141.4600      11.2        82       990        98
VIS    2025250     20200   21.2700  141.4300       9.9        83       971        94
VIS    2025250     20200   21.2900  141.4000      10.0        82       958       100
VIS    2025250     20200   21.2900  141.3800      10.0        81       958        99
VIS    2025250     20200   21.2700  141.3500       9.8        80       932        99
VIS    2025250     20200   21.2800  141.3200       9.9        81       937       100
VIS    2025250     20200   21.2600  140.5500       9.6        82       987        90
VIS    2025250     20200   21.2600  140.5100      10.3        79       972        99
VIS    2025250     20200   21.2800  140.5000      10.5        79       956       100
VIS    2025250     20200   21.2800  140.4700      10.6        79       963        99
VIS    2025250     20200   21.2600  140.4300      10.2        77       936        99
VIS    2025250     20200   21.2800  140.4100       9.9        79       933        99
VIS    2025250     20200   21.3000  146.9800       5.2        72       985        95
VIS    2025250     20200   21.3000  146.5400       6.8        82       975        94
VIS    2025250     20200   21.2900  146.5300       6.6        82       974        98
VIS    2025250     20200   21.2900  145.3000       8.0        97       979        90
VIS    2025250     20200   21.2800  145.2700       8.2        93       974        95
VIS    2025250     20200   21.2900  145.2400       8.6        89       963        96
VIS    2025250     20200   21.2800  145.2200       8.6        88       961        95
VIS    2025250     20200   21.2800  145.1900       8.4        87       941        97
VIS    2025250     20200   21.2700  145.1700       8.8        87       911        95
VIS    2025250     20200   21.2800  145.1500       8.7        88       900        96
VIS    2025250     20200   21.2800  145.1200       8.2        83       895        97
VIS    2025250     20200   21.2700  145.0900       8.1        82       895        90
VIS    2025250     20200   21.2700  145.0800       8.1        84       896        90
VIS    2025250     20200   21.2700  145.0400       8.0        88       896        96
VIS    2025250     20200   21.2800  145.0200       8.4        88       896        96
VIS    2025250     20200   21.2700  145.0000       8.9        91       896        96
VIS    2025250     20200   21.2800  144.9600       9.6        86       897        95
VIS    2025250     20200   21.2700  144.9400       9.6        82       897        94
VIS    2025250     20200   21.2600  144.9100       9.3        83       898        94
VIS    2025250     20200   21.2700  144.8600       9.4        75       898        93
VIS    2025250     20200   21.2600  144.8500       8.9        77       898        97
VIS    2025250     20200   21.2700  144.8300       8.4        80       897        93
VIS    2025250     20200   21.2700  144.8000       8.0        87       895        91
VIS    2025250     20200   21.2600  144.7700       8.2        87       894        98
VIS    2025250     20200   21.2700  144.7400       8.6        86       894        99
VIS    2025250     20200   21.2800  144.7300       8.4        85       894        99
VIS    2025250     20200   21.2700  144.6900       8.5        85       894        99
VIS    2025250     20200   21.2700  144.6700       8.9        84       893        98
VIS    2025250     20200   21.2700  144.6600       9.1        84       895        98
VIS    2025250     20200   21.2600  144.6200       9.5        84       898        98
VIS    2025250     20200   21.2800  144.6000       9.3        82       899        96
VIS    2025250     20200   21.2700  144.5700       8.8        81       899        96
VIS    2025250     20200   21.2800  144.5500       8.6        81       899        96
VIS    2025250     20200   21.2600  144.5300       8.7        79       899        96
VIS    2025250     20200   21.2700  144.4900       8.7        79       900        97
VIS    2025250     20200   21.2700  144.4800       8.7        80       900        97
VIS    2025250     20200   21.2800  144.4400       9.1        80       906        91
VIS    2025250     20200   21.2800  144.4300       9.3        79       903        93
VIS    2025250     20200   21.2700  144.4000       9.1        74       902        97
VIS    2025250     20200   21.2700  144.3800       8.8        73       902        97
VIS    2025250     20200   21.2800  144.3500       8.4        74       902        94
VIS    2025250     20200   21.2600  144.3200       8.6        73       901        95
VIS    2025250     20200   21.2600  144.3100       8.6        74       901        97
VIS    2025250     20200   21.2600  144.2800       8.0        76       901        99
VIS    2025250     20200   21.2700  144.2400       7.9        81       902        99
VIS    2025250     20200   21.2700  144.2300       8.1        82       902        99
VIS    2025250     20200   21.2600  144.2000       8.4        83       902        96
VIS    2025250     20200   21.2800  144.1700       8.3        83       902       100
VIS    2025250     20200   21.2700  144.1400       8.2        80       901       100
VIS    2025250     20200   21.2600  144.1300       8.3        80       902        99
VIS    2025250     20200   21.2700  144.1100       8.8        82       901        99
VIS    2025250     20200   21.2800  144.0700       9.3        80       902        95
VIS    2025250     20200   21.2700  144.0500       9.4        79       904        95
VIS    2025250     20200   21.2700  144.0200       9.4        78       905        98
VIS    2025250     20200   21.2700  144.0100       9.3        78       906        98
VIS    2025250     20200   21.2700  143.9800       9.2        78       906        98
VIS    2025250     20200   21.2700  143.9500       9.2        76       906        97
VIS    2025250     20200   21.2700  143.9400       9.2        76       906        96
VIS    2025250     20200   21.2800  143.9000       9.5        75       908        97
VIS    2025250     20200   21.2700  143.8900       9.3        75       908        98
VIS    2025250     20200   21.2700  143.8400       8.5        78       910        99
VIS    2025250     20200   21.2700  143.8400       8.4        78       910        99
VIS    2025250     20200   21.2700  143.8100       8.6        77       911        99
VIS    2025250     20200   21.2700  143.7800       9.3        80       912        99
VIS    2025250     20200   21.2700  143.4700       9.5        87       928        97
VIS    2025250     20200   21.2600  143.4400       9.6        78       921        90
VIS    2025250     20200   21.2600  143.4000       9.4        88       919        91
VIS    2025250     20200   21.2700  143.3700       9.5        91       920        93
VIS    2025250     20200   21.2600  143.3600       9.5        92       920        94
VIS    2025250     20200   21.2700  143.3200       9.7        89       920        97
VIS    2025250     20200   21.2500  143.3200      10.3        91       919        95
VIS    2025250     20200   21.2600  143.2800      10.2        78       918        96
VIS    2025250     20200   21.2600  143.2500      10.0        77       918        97
VIS    2025250     20200   21.2500  143.2300       9.9        78       917        97
VIS    2025250     20200   21.2700  143.2000       9.8        82       916        98
VIS    2025250     20200   21.2700  143.1900      10.0        81       915        98
VIS    2025250     20200   21.2700  143.1700       9.6        82       915        99
VIS    2025250     20200   21.2700  143.1200       9.1        86       914        96
VIS    2025250     20200   21.2600  143.1200       9.1        86       914        95
VIS    2025250     20200   21.2500  143.0800       9.4        87       915        93
VIS    2025250     20200   21.2600  143.0700       9.3        87       915        94
VIS    2025250     20200   21.2600  143.0500       9.3        90       915        96
VIS    2025250     20200   21.2600  143.0200       9.1        91       914        94
VIS    2025250     20200   21.2600  142.9800       8.9        90       915        94
VIS    2025250     20200   21.2600  142.9700       9.0        90       916        94
VIS    2025250     20200   21.2700  142.9300       9.4        93       917        96
VIS    2025250     20200   21.2700  142.9200       9.4        94       916        95
VIS    2025250     20200   21.2500  142.9000       9.4        95       916        95
VIS    2025250     20200   21.2500  142.8700       9.3        93       916        97
VIS    2025250     20200   21.2500  142.8300       9.3        88       916        96
VIS    2025250     20200   21.2500  142.8200       9.3        86       916        96
VIS    2025250     20200   21.2600  142.8000       9.4        83       917        95
VIS    2025250     20200   21.2600  142.7700       9.3        84       919        94
VIS    2025250     20200   21.2600  142.7500       9.2        85       919        92
VIS    2025250     20200   21.2600  142.6300       9.3        80       925        98
VIS    2025250     20200   21.2500  142.6300       9.4        80       925        97
VIS    2025250     20200   21.2500  142.4300       9.4        74       977        91
VIS    2025250     20200   21.2600  142.3900       9.4        76       961        92
VIS    2025250     20200   21.2700  142.3700       9.3        78       950        96
VIS    2025250     20200   21.2700  142.3500       9.4        82       942        98
VIS    2025250     20200   21.2600  142.3200       9.8        83       931        99
VIS    2025250     20200   21.2700  142.2800       9.7        80       935        97
VIS    2025250     20200   21.2700  142.2500       9.8        78       938        98
VIS    2025250     20200   21.2700  142.2500       9.9        77       938        98
VIS    2025250     20200   21.2700  142.2100       9.6        77       931        97
VIS    2025250     20200   21.2600  142.2000       9.6        78       931        97
VIS    2025250     20200   21.2400  141.9100      10.0        79       967        99
VIS    2025250     20200   21.2400  141.9000      10.2        80       967        98
VIS    2025250     20200   21.2400  141.8700      10.5        81       974        96
VIS    2025250     20200   21.2400  141.8300      10.8        76       975        98
VIS    2025250     20200   21.2400  141.8100      10.1        75       959        97
VIS    2025250     20200   21.2400  141.8000       9.6        75       959        95
VIS    2025250     20200   21.2600  141.7500       9.5        80       947        99
VIS    2025250     20200   21.2400  141.6900      10.4        79       984        96
VIS    2025250     20200   21.2400  141.6700      10.4        77       984        96
VIS    2025250     20200   21.2600  141.5100      10.4        78       996        95
VIS    2025250     20200   21.2500  141.5000      10.6        79       996        98
VIS    2025250     20200   21.2500  141.4700      10.9        81       990        99
VIS    2025250     20200   21.2600  141.4600      11.0        82       990        98
VIS    2025250     20200   21.2600  141.4300      10.2        82       982        96
VIS    2025250     20200   21.2400  141.3700      10.3        76       932        96
VIS    2025250     20200   21.2500  141.3500      10.2        78       930        96
VIS    2025250     20200   21.2600  141.3300       9.9        81       930        98
VIS    2025250     20200   21.2400  140.5500      10.2        80       987        97
VIS    2025250     20200   21.2400  140.5300      10.2        80       987        98
VIS    2025250     20200   21.2500  140.5100      10.3        80       975        98
VIS    2025250     20200   21.2500  140.5000      10.2        80       963        99
VIS    2025250     20200   21.2400  140.4700      10.2        79       940        96
VIS    2025250     20200   21.2600  140.4400      10.3        77       940        99
VIS    2025250     20200   21.2400  140.4200      10.2        78       933        94
VIS    2025250     20200   21.3200  149.6800       4.0        86       984        90
VIS    2025250     20200   21.3000  149.6700       4.4        87       991        91
VIS    2025250     20200   21.2600  147.1900       5.8        77       973        93
VIS    2025250     20200   21.2600  146.5400       6.7        81       958        97
VIS    2025250     20200   21.2600  145.2800       8.6        94       981        94
VIS    2025250     20200   21.2600  145.2600       8.6        92       974        95
VIS    2025250     20200   21.2600  145.2200       8.8        87       970        95
VIS    2025250     20200   21.2600  145.2000       8.8        86       941        96
VIS    2025250     20200   21.2500  145.1800       9.0        86       914        97
VIS    2025250     20200   21.2600  145.1700       8.9        88       911        95
VIS    2025250     20200   21.2500  145.0500       8.4        90       896        93
VIS    2025250     20200   21.2500  145.0400       8.3        89       896        95
VIS    2025250     20200   21.2400  145.0000       8.8        88       896        97
VIS    2025250     20200   21.2500  144.9900       8.8        88       896        97
VIS    2025250     20200   21.2500  144.9500       9.3        83       897        96
VIS    2025250     20200   21.2600  144.9400       9.5        82       897        95
VIS    2025250     20200   21.2500  144.9200       9.3        82       898        94
VIS    2025250     20200   21.2600  144.8800       9.3        79       898        92
VIS    2025250     20200   21.2500  144.8600       9.1        78       898        96
VIS    2025250     20200   21.2600  144.8400       8.7        79       898        97
VIS    2025250     20200   21.2400  144.8000       7.7        85       897        99
VIS    2025250     20200   21.2600  144.7700       8.1        87       894        98
VIS    2025250     20200   21.2600  144.7500       8.5        88       893        99
VIS    2025250     20200   21.2500  144.7300       8.3        88       896        99
VIS    2025250     20200   21.2500  144.7200       8.4        88       896        99
VIS    2025250     20200   21.2600  144.6800       8.7        85       894        99
VIS    2025250     20200   21.2400  144.6500       9.2        86       897        99
VIS    2025250     20200   21.2600  144.6200       9.4        84       898        98
VIS    2025250     20200   21.2400  144.6000       9.2        82       904        97
VIS    2025250     20200   21.2400  144.5800       8.9        80       905        97
VIS    2025250     20200   21.2400  144.5700       8.9        80       903        97
VIS    2025250     20200   21.2500  144.5400       8.7        80       901        96
VIS    2025250     20200   21.2400  144.5200       8.7        81       900        92
VIS    2025250     20200   21.2500  144.4900       8.5        80       901        94
VIS    2025250     20200   21.2500  144.4500       8.7        79       908        90
VIS    2025250     20200   21.2400  144.4400       8.9        77       908        96
VIS    2025250     20200   21.2500  144.4000       9.0        75       903        97
VIS    2025250     20200   21.2400  144.3800       9.0        73       904        96
VIS    2025250     20200   21.2500  144.3600       8.9        70       903        94
VIS    2025250     20200   21.2500  144.3300       8.8        72       903        95
VIS    2025250     20200   21.2500  144.3200       8.6        74       902        95
VIS    2025250     20200   21.2500  144.2800       8.0        77       902        99
VIS    2025250     20200   21.2300  144.2500       8.4        82       904        98
VIS    2025250     20200   21.2300  144.2400       8.7        83       904        98
VIS    2025250     20200   21.2300  144.2200       9.0        82       906        99
VIS    2025250     20200   21.2400  144.1800       8.2        80       905        97
VIS    2025250     20200   21.2500  144.1600       8.1        81       903        99
VIS    2025250     20200   21.2400  144.1400       8.1        79       903        97
VIS    2025250     20200   21.2500  144.1200       8.5        81       903        99
VIS    2025250     20200   21.2500  144.0900       9.0        82       902        99
VIS    2025250     20200   21.2500  144.0500       9.5        78       905        95
VIS    2025250     20200   21.2500  144.0400       9.6        77       906        96
VIS    2025250     20200   21.2300  144.0100       9.4        79       909        98
VIS    2025250     20200   21.2400  143.9900       9.2        78       909        98
VIS    2025250     20200   21.2400  143.9700       9.1        77       909        98
VIS    2025250     20200   21.2400  143.9300       9.5        73       909        97
VIS    2025250     20200   21.2400  143.9200       9.3        75       909        97
VIS    2025250     20200   21.2400  143.9000       9.2        75       909        98
VIS    2025250     20200   21.2500  143.8600       8.5        77       910        97
VIS    2025250     20200   21.2500  143.8300       8.5        78       913        99
VIS    2025250     20200   21.2500  143.8300       8.4        77       912        99
VIS    2025250     20200   21.2400  143.8000       9.1        78       915        99
VIS    2025250     20200   21.2400  143.4800       9.6        85       954        93
VIS    2025250     20200   21.2400  143.4800       9.6        85       928        98
VIS    2025250     20200   21.2300  143.4500       9.6        79       922        92
VIS    2025250     20200   21.2400  143.3900       9.6        92       919        95
VIS    2025250     20200   21.2500  143.3800       9.6        92       919        92
VIS    2025250     20200   21.2300  143.3500      10.0        96       919        90
VIS    2025250     20200   21.2400  143.3200      10.4        92       919        95
VIS    2025250     20200   21.2400  143.2900      10.2        80       919        97
VIS    2025250     20200   21.2400  143.2600      10.1        78       918        97
VIS    2025250     20200   21.2400  143.2500      10.0        78       917        97
VIS    2025250     20200   21.2400  143.2100       9.5        83       914        98
VIS    2025250     20200   21.2500  143.0700       9.4        89       914        94
VIS    2025250     20200   21.2200  143.0400       9.2        95       836        96
VIS    2025250     20200   21.2300  143.0300       9.2        95       836        96
VIS    2025250     20200   21.2400  143.0100       9.1        94       914        95
VIS    2025250     20200   21.2400  142.9800       9.0        91       914        95
VIS    2025250     20200   21.2400  142.9500       9.2        92       915        96
VIS    2025250     20200   21.2300  142.9300       9.2        93       843        95
VIS    2025250     20200   21.2300  142.8900       9.2        93       842        94
VIS    2025250     20200   21.2400  142.8900       9.3        94       843        95
VIS    2025250     20200   21.2200  142.6500       8.6        76       902        90
VIS    2025250     20200   21.2300  142.3800       9.7        79       969        96
VIS    2025250     20200   21.2200  142.3700       9.8        79       969        97
VIS    2025250     20200   21.2400  142.3500       9.8        79       946        99
VIS    2025250     20200   21.2400  142.3200       9.6        79       937        99
VIS    2025250     20200   21.2200  142.2800       9.7        77       939        97
VIS    2025250     20200   21.2200  142.2600       9.9        75       942        98
VIS    2025250     20200   21.2200  142.2300       9.4        78       942        98
VIS    2025250     20200   21.2200  142.2300       9.4        78       942        97
VIS    2025250     20200   21.2300  142.1900       9.9        79       944        99
VIS    2025250     20200   21.2200  142.1700      11.1        81       965        98
VIS    2025250     20200   21.2200  142.1500      11.4        85       988        93
VIS    2025250     20200   21.2200  142.0100       8.7        79       976        92
VIS    2025250     20200   21.2200  141.9900       9.4        80       956        96
VIS    2025250     20200   21.2200  141.9700       9.3        80       956        94
VIS    2025250     20200   21.2300  141.9300       9.4        79       967        93
VIS    2025250     20200   21.2300  141.8900      10.3        79       966        97
VIS    2025250     20200   21.2200  141.8800      10.1        78       965        98
VIS    2025250     20200   21.2200  141.8400      10.2        76       978        95
VIS    2025250     20200   21.2200  141.8200      10.5        71       976        97
VIS    2025250     20200   21.2300  141.6600      10.3        78       984        96
VIS    2025250     20200   21.2300  141.6400       9.3        78       984        94
VIS    2025250     20200   21.2300  141.6300       9.1        80       990        95
VIS    2025250     20200   21.2200  141.5700      10.2        78       994        98
VIS    2025250     20200   21.2200  141.5600      10.3        78       992        98
VIS    2025250     20200   21.2200  141.5200      10.6        78       984        99
VIS    2025250     20200   21.2200  141.5100      10.4        78       984        99
VIS    2025250     20200   21.2400  141.4800      10.6        82       990        98
VIS    2025250     20200   21.2200  141.4500      10.4        81       960        97
VIS    2025250     20200   21.2400  141.4200      10.3        80       951        95
VIS    2025250     20200   21.2200  141.4100      10.6        76       951        97
VIS    2025250     20200   21.2400  141.3800      10.2        77       932        96
VIS    2025250     20200   21.2300  141.3400      10.0        77       932        96
VIS    2025250     20200   21.2200  141.3300       9.6        77       962        93
VIS    2025250     20200   21.2300  140.5500      10.3        80       987        97
VIS    2025250     20200   21.2300  140.5300      10.4        79       982        98
VIS    2025250     20200   21.2100  140.5000      10.4        79       973        99
VIS    2025250     20200   21.2100  140.4800      10.2        81       963        99
VIS    2025250     20200   21.2100  140.4400      10.1        81       940        98
VIS    2025250     20200   21.2300  140.4300      10.4        78       937        96
VIS    2025250     20200   21.2900  149.6500       4.4        85       991        90
VIS    2025250     20200   21.2500  147.7900       4.4        62       953        94
VIS    2025250     20200   21.2400  146.5500       6.8        83       958        95
VIS    2025250     20200   21.2200  145.1600       8.4        85       901       100
VIS    2025250     20200   21.2200  145.1600       8.3        85       901       100
VIS    2025250     20200   21.2200  145.1100       8.3        91       899        93
VIS    2025250     20200   21.2200  145.0900       8.9        94       899        92
VIS    2025250     20200   21.2200  145.0800       8.9        94       899        93
VIS    2025250     20200   21.2300  145.0400       8.4        90       898        95
VIS    2025250     20200   21.2200  145.0200       8.6        90       899        95
VIS    2025250     20200   21.2300  144.9900       8.8        87       900        98
VIS    2025250     20200   21.2300  144.9800       8.8        87       900        95
VIS    2025250     20200   21.2200  144.9400       9.2        85       901        94
VIS    2025250     20200   21.2200  144.9300       9.4        85       901        94
VIS    2025250     20200   21.2300  144.8900       9.4        83       901        93
VIS    2025250     20200   21.2200  144.8700       9.3        79       902        96
VIS    2025250     20200   21.2300  144.8500       9.0        78       898        97
VIS    2025250     20200   21.2300  144.8300       8.6        77       899        99
VIS    2025250     20200   21.2300  144.8100       7.9        84       898        97
VIS    2025250     20200   21.2100  144.7800       7.6        86       900        96
VIS    2025250     20200   21.2300  144.7600       7.6        91       893        97
VIS    2025250     20200   21.2300  144.7200       8.4        90       897        98
VIS    2025250     20200   21.2100  144.7000       8.2        92       901        99
VIS    2025250     20200   21.2100  144.6700       8.7        87       897        98
VIS    2025250     20200   21.2300  144.6500       9.1        86       897        99
VIS    2025250     20200   21.2200  144.6300       9.0        84       898        99
VIS    2025250     20200   21.2200  144.6100       9.2        83       901        99
VIS    2025250     20200   21.2200  144.5800       9.1        81       906        98
VIS    2025250     20200   21.2300  144.5600       8.9        80       901        97
VIS    2025250     20200   21.2200  144.5400       8.6        83       901        98
VIS    2025250     20200   21.2100  144.4500       9.1        79       907        97
VIS    2025250     20200   21.2300  144.4400       9.0        76       907        97
VIS    2025250     20200   21.2300  144.4000       9.1        75       905        97
VIS    2025250     20200   21.2200  144.3700       8.9        75       904        97
VIS    2025250     20200   21.2100  144.3600       8.8        76       904        98
VIS    2025250     20200   21.2100  144.3300       8.8        75       903        97
VIS    2025250     20200   21.2100  144.3100       8.6        77       903        98
VIS    2025250     20200   21.2100  144.2700       8.4        79       904        98
VIS    2025250     20200   21.2300  144.2500       8.6        82       904        98
VIS    2025250     20200   21.2300  144.2200       9.1        82       906        99
VIS    2025250     20200   21.2200  144.2200       9.2        81       906        99
VIS    2025250     20200   21.2200  144.1900       8.5        79       906        98
VIS    2025250     20200   21.2300  144.1500       7.9        78       903        93
VIS    2025250     20200   21.2100  144.1400       7.9        78       904        93
VIS    2025250     20200   21.2100  144.1200       8.4        82       905        98
VIS    2025250     20200   21.2100  144.0700       9.2        78       904        97
VIS    2025250     20200   21.2100  144.0700       9.1        76       904        95
VIS    2025250     20200   21.2100  144.0200       9.3        76       910        96
VIS    2025250     20200   21.2200  144.0200       9.3        78       910        97
VIS    2025250     20200   21.2300  143.9900       9.1        78       909        98
VIS    2025250     20200   21.2100  143.9600       9.4        75       909        97
VIS    2025250     20200   21.2200  143.9300       9.8        73       910        96
VIS    2025250     20200   21.2100  143.9100       9.7        77       912        98
VIS    2025250     20200   21.2200  143.8700       9.4        83       912        99
VIS    2025250     20200   21.2200  143.8500       8.9        81       914        99
VIS    2025250     20200   21.2100  143.8400       9.0        80       915       100
VIS    2025250     20200   21.2200  143.8200       9.2        77       916        99
VIS    2025250     20200   21.2100  143.5200       9.4        84       939        96
VIS    2025250     20200   21.2100  143.5000       9.7        83       939        98
VIS    2025250     20200   21.2100  143.4800      10.0        83       926        98
VIS    2025250     20200   21.2000  143.4400       9.8        82       920        98
VIS    2025250     20200   21.2000  143.4100       9.5        82       919        98
VIS    2025250     20200   21.2100  143.4000       9.5        85       920        98
VIS    2025250     20200   21.2200  143.3700       9.7        93       919        94
VIS    2025250     20200   21.2000  143.3500       9.8        90       919        96
VIS    2025250     20200   21.2000  143.3300       9.8        86       919        98
VIS    2025250     20200   21.2100  143.2900      10.0        81       920        98
VIS    2025250     20200   21.2100  143.2600       9.9        80       918        98
VIS    2025250     20200   21.2000  143.2500       9.7        82       916        99
VIS    2025250     20200   21.2000  143.0400       9.2        96       837        96
VIS    2025250     20200   21.2000  143.0300       9.3        97       837        96
VIS    2025250     20200   21.2000  142.9900       9.3        97       837        97
VIS    2025250     20200   21.2000  142.9800       9.2        95       837        96
VIS    2025250     20200   21.2200  142.9500       9.0        92       837        93
VIS    2025250     20200   21.2100  142.4200       9.6        78       986        91
VIS    2025250     20200   21.2100  142.4000       9.7        79       986        92
VIS    2025250     20200   21.2000  142.3800      10.0        78       970        96
VIS    2025250     20200   21.2000  142.3600       9.8        79       970        96
VIS    2025250     20200   21.2000  142.3200       9.6        79       939        95
VIS    2025250     20200   21.1900  142.3100       9.7        80       937        98
VIS    2025250     20200   21.2100  142.2900       9.6        78       924        96
VIS    2025250     20200   21.2000  142.2600       9.4        78       939        99
VIS    2025250     20200   21.2100  142.2300       9.4        79       942        98
VIS    2025250     20200   21.1900  142.2000       9.6        83       942        99
VIS    2025250     20200   21.2000  142.1900      10.0        82       950        99
VIS    2025250     20200   21.1900  142.1600      10.1        83       984        98
VIS    2025250     20200   21.2000  142.1400       9.9        82       987        98
VIS    2025250     20200   21.1900  142.1000       9.1        84       980        90
VIS    2025250     20200   21.2000  142.0300       8.7        78       972        90
VIS    2025250     20200   21.2000  142.0200       8.8        78       972        92
VIS    2025250     20200   21.1900  141.9700      10.0        79       950        98
VIS    2025250     20200   21.1900  141.9500      10.2        79       936        99
VIS    2025250     20200   21.2000  141.9200       9.9        78       926        96
VIS    2025250     20200   21.2100  141.9200       9.8        78       936        98
VIS    2025250     20200   21.2100  141.8900       9.8        78       955        98
VIS    2025250     20200   21.2100  141.7700      10.5        71       980        99
VIS    2025250     20200   21.2000  141.6900      10.6        76       976        99
VIS    2025250     20200   21.2000  141.6500      10.0        79       981        96
VIS    2025250     20200   21.2000  141.6500       9.9        79       981        97
VIS    2025250     20200   21.2000  141.6000       9.6        79       980        97
VIS    2025250     20200   21.2100  141.6000       9.5        80       990        97
VIS    2025250     20200   21.1900  141.5600      10.6        79       978        99
VIS    2025250     20200   21.1900  141.5500      10.5        80       975        98
VIS    2025250     20200   21.2000  141.5200      10.3        80       958        98
VIS    2025250     20200   21.2100  141.4900      10.1        80       959        98
VIS    2025250     20200   21.2100  141.4700      10.1        82       959        97
VIS    2025250     20200   21.2000  141.4400      10.2        79       956        95
VIS    2025250     20200   21.1900  141.4200      10.4        78       960        98
VIS    2025250     20200   21.1900  141.4000      10.7        77       964        99
VIS    2025250     20200   21.2000  141.3800      10.7        76       969        99
VIS    2025250     20200   21.1900  141.3300       9.1        81       986        95
VIS    2025250     20200   21.2000  141.3300       9.3        80       984        95
VIS    2025250     20200   21.2000  141.3000       9.1        80       984        93
VIS    2025250     20200   21.1900  141.2700      10.4        77       986        90
VIS    2025250     20200   21.1900  140.6300      10.5        76       981        97
VIS    2025250     20200   21.1900  140.6100      10.7        75       981        97
VIS    2025250     20200   21.2100  140.5500      10.7        78       984        98
VIS    2025250     20200   21.1900  140.5400      10.6        77       984        98
VIS    2025250     20200   21.2000  140.5200      10.8        76       975        99
VIS    2025250     20200   21.1900  140.4900      10.4        77       971        98
VIS    2025250     20200   21.1900  140.4700       9.9        80       940        97
VIS    2025250     20200   21.1900  140.4300      10.1        82       937        97
VIS    2025250     20200   21.1900  140.4200      10.0        82       937        98
VIS    2025250     20200   21.2200  147.3400       6.4        92       993        91
VIS    2025250     20200   21.2300  146.5500       6.9        82       958        93
VIS    2025250     20200   21.2000  145.2500       9.0        89       990        90
VIS    2025250     20200   21.1900  145.2200       9.1        88       971        90
VIS    2025250     20200   21.1900  145.1900       8.5        87       932        97
VIS    2025250     20200   21.2000  145.1800       8.4        87       913        99
VIS    2025250     20200   21.2100  145.1600       8.3        85       901       100
VIS    2025250     20200   21.2000  145.1200       8.0        89       899        94
VIS    2025250     20200   21.2000  145.1100       8.5        92       899        92
VIS    2025250     20200   21.2100  145.0700       8.8        94       898        95
VIS    2025250     20200   21.2100  145.0400       8.5        92       899        96
VIS    2025250     20200   21.2100  145.0300       8.6        92       899        95
VIS    2025250     20200   21.1900  145.0100       9.0        89       901        90
VIS    2025250     20200   21.1900  144.9700       9.3        88       902        91
VIS    2025250     20200   21.2000  144.9500       9.1        86       902        91
VIS    2025250     20200   21.2000  144.9200       9.7        86       902        94
VIS    2025250     20200   21.2100  144.9000       9.6        86       902        95
VIS    2025250     20200   21.1900  144.8700       9.4        78       902        96
VIS    2025250     20200   21.1900  144.8600       9.1        76       902        97
VIS    2025250     20200   21.2100  144.8400       9.1        75       901        97
VIS    2025250     20200   21.1900  144.8100       8.1        79       900        91
VIS    2025250     20200   21.1900  144.7800       7.5        81       900        93
VIS    2025250     20200   21.2000  144.7600       8.0        83       900        97
VIS    2025250     20200   21.1900  144.7200       7.9        92       902        96
VIS    2025250     20200   21.2100  144.7100       8.1        92       901        98
VIS    2025250     20200   21.2000  144.6900       8.1        94       901        97
VIS    2025250     20200   21.1900  144.6500       8.6        89       897        98
VIS    2025250     20200   21.2000  144.6400       8.8        87       898        97
VIS    2025250     20200   21.2000  144.6200       9.0        86       898        99
VIS    2025250     20200   21.2000  144.5900       9.1        86       906       100
VIS    2025250     20200   21.2100  144.5500       8.8        84       901        99
VIS    2025250     20200   21.2000  144.5300       8.7        86       903        99
VIS    2025250     20200   21.1900  144.5000       8.8        87       907        99
VIS    2025250     20200   21.1900  144.4900       9.0        85       907        98
VIS    2025250     20200   21.2100  144.4500       9.2        78       907        98
VIS    2025250     20200   21.2000  144.4300       9.5        78       907        98
VIS    2025250     20200   21.2000  144.4200       9.4        76       907        98
VIS    2025250     20200   21.1800  144.3700       8.6        79       905        98
VIS    2025250     20200   21.1900  144.3600       8.6        78       904        99
VIS    2025250     20200   21.2000  144.3300       8.8        76       903        98
VIS    2025250     20200   21.2000  144.3200       8.8        77       903        98
VIS    2025250     20200   21.2000  144.2800       8.3        81       904        98
VIS    2025250     20200   21.1900  144.2600       8.5        82       903        99
VIS    2025250     20200   21.2000  144.2200       9.0        79       904        98
VIS    2025250     20200   21.1900  144.2200       8.9        79       904        98
VIS    2025250     20200   21.1800  144.1900       8.2        78       905        98
VIS    2025250     20200   21.2000  144.1700       7.8        79       906        97
VIS    2025250     20200   21.2000  144.1300       8.0        82       904        99
VIS    2025250     20200   21.2000  144.1100       8.6        83       905        99
VIS    2025250     20200   21.1800  144.0800       8.6        78       904        98
VIS    2025250     20200   21.1900  144.0600       8.9        75       906        94
VIS    2025250     20200   21.2000  144.0300       9.2        76       910        97
VIS    2025250     20200   21.2000  144.0200       9.2        76       910        97
VIS    2025250     20200   21.2000  144.0000       9.2        77       910        97
VIS    2025250     20200   21.2000  143.9600       9.3        74       909        97
VIS    2025250     20200   21.1800  143.9400       9.4        75       911        97
VIS    2025250     20200   21.1800  143.9200       9.0        76       912        98
VIS    2025250     20200   21.1800  143.8800       8.2        77       915        97
VIS    2025250     20200   21.1800  143.8600       8.4        77       926        98
VIS    2025250     20200   21.2000  143.8300       9.2        78       925       100
VIS    2025250     20200   21.1900  143.5400       9.4        86       933        99
VIS    2025250     20200   21.2000  143.5200       9.4        83       929        99
VIS    2025250     20200   21.1900  143.4900      10.0        80       920        98
VIS    2025250     20200   21.1800  143.4800      10.0        82       919        98
VIS    2025250     20200   21.1800  143.4400      10.0        80       918        98
VIS    2025250     20200   21.1800  143.4300      10.0        79       918        98
VIS    2025250     20200   21.1900  143.4000       9.6        82       919        99
VIS    2025250     20200   21.1800  143.3800       9.7        80       918        98
VIS    2025250     20200   21.1800  143.3600       9.7        80       918        95
VIS    2025250     20200   21.1900  143.3300       9.5        80       918        97
VIS    2025250     20200   21.1800  143.2900       9.1        78       917        98
VIS    2025250     20200   21.1900  143.2800       9.4        78       917        96
VIS    2025250     20200   21.1700  143.0500       9.3        96       842        91
VIS    2025250     20200   21.1900  143.0300       9.3        97       840        96
VIS    2025250     20200   21.1700  143.0100       9.3        97       842        96
VIS    2025250     20200   21.1700  142.9800       9.2        97       842        95
VIS    2025250     20200   21.1900  142.9500       9.1        94       837        94
VIS    2025250     20200   21.1700  142.7700       8.9        83       893        92
VIS    2025250     20200   21.1700  142.7000       8.3        81       927        94
VIS    2025250     20200   21.1700  142.6900       8.2        81       927        93
VIS    2025250     20200   21.1900  142.3900      10.0        79       986        95
VIS    2025250     20200   21.1900  142.3800       9.8        79       978        94
VIS    2025250     20200   21.1900  142.3500       9.7        79       969        96
VIS    2025250     20200   21.1800  142.3100       9.8        80       940        99
VIS    2025250     20200   21.1900  142.3000       9.7        81       937        99
VIS    2025250     20200   21.1800  142.2600       9.3        79       934        98
VIS    2025250     20200   21.1900  142.2600       9.3        79       936        99
VIS    2025250     20200   21.1700  142.2100       8.9        85       950        93
VIS    2025250     20200   21.1700  142.2100       9.1        85       950        95
VIS    2025250     20200   21.1900  142.1600      10.0        83       980        97
VIS    2025250     20200   21.1700  142.1400       9.4        85       980        93
VIS    2025250     20200   21.1800  142.1200       9.1        84       980        90
VIS    2025250     20200   21.1900  142.0900       9.1        84       980        90
VIS    2025250     20200   21.1700  142.0700       9.4        83       962        95
VIS    2025250     20200   21.1700  142.0500       9.3        80       952        96
VIS    2025250     20200   21.1900  142.0300       8.9        80       952        93
VIS    2025250     20200   21.1800  142.0100       9.4        81       921        96
VIS    2025250     20200   21.1700  141.9700      10.2        78       909        92
VIS    2025250     20200   21.1900  141.9400      10.3        79       936        99
VIS    2025250     20200   21.1800  141.9400      10.3        79       936        99
VIS    2025250     20200   21.1900  141.9100       9.8        77       914        92
VIS    2025250     20200   21.1800  141.7000      10.3        75       990        95
VIS    2025250     20200   21.1800  141.6900      10.2        77       990        93
VIS    2025250     20200   21.1700  141.6600      10.3        80       990        96
VIS    2025250     20200   21.1700  141.6200      10.0        81       980        98
VIS    2025250     20200   21.1800  141.6100       9.9        80       980        98
VIS    2025250     20200   21.1800  141.5900       9.8        81       994        98
VIS    2025250     20200   21.1800  141.5600      10.5        81       969        98
VIS    2025250     20200   21.1700  141.5200      10.1        84       958        98
VIS    2025250     20200   21.1700  141.5000      10.2        82       949        98
VIS    2025250     20200   21.1800  141.4900      10.3        80       948        97
VIS    2025250     20200   21.1800  141.4500      10.2        81       948        98
VIS    2025250     20200   21.1800  141.4300      10.2        80       950        98
VIS    2025250     20200   21.1800  141.4000      10.7        78       964        99
VIS    2025250     20200   21.1800  141.3900      10.7        77       969        99
VIS    2025250     20200   21.1600  141.3600      10.0        82       973        96
VIS    2025250     20200   21.1800  141.3400       9.6        82       979        96
VIS    2025250     20200   21.1800  141.3100       9.7        82       977        95
VIS    2025250     20200   21.1800  141.2900      10.2        80       977        94
VIS    2025250     20200   21.1700  141.2600      10.3        78       979        91
VIS    2025250     20200   21.1600  141.2300      10.2        82       994        95
VIS    2025250     20200   21.1700  141.2300      10.1        82       996        95
VIS    2025250     20200   21.1700  140.6500      10.2        79       990        96
VIS    2025250     20200   21.1700  140.6200      10.7        76       981        98
VIS    2025250     20200   21.1700  140.6100      10.9        76       981        98
VIS    2025250     20200   21.1600  140.5600      10.4        80       984        94
VIS    2025250     20200   21.1600  140.5600      10.3        79       984        96
VIS    2025250     20200   21.1800  140.5300      10.5        76       982        98
VIS    2025250     20200   21.1600  140.5000      10.5        76       971        97
VIS    2025250     20200   21.1700  140.4700       9.6        81       962        97
VIS    2025250     20200   21.1700  140.4600       9.6        82       944        98
VIS    2025250     20200   21.1800  140.4200       9.9        82       940        98
VIS    2025250     20200   21.1600  140.4100       9.7        83       941        99
VIS    2025250     20200   21.1900  147.3900       6.5        81       987        94
VIS    2025250     20200   21.1800  146.5600       7.1        67       976        92
VIS    2025250     20200   21.1900  145.2300       9.0        87       971        91
VIS    2025250     20200   21.1700  145.1900       8.1        89       933        96
VIS    2025250     20200   21.1800  145.1900       8.1        88       932        97
VIS    2025250     20200   21.1700  145.1500       8.2        88       901        97
VIS    2025250     20200   21.1700  145.1400       8.3        89       900        96
VIS    2025250     20200   21.1800  145.1100       8.4        94       899        94
VIS    2025250     20200   21.1900  145.0700       8.6        91       899        98
VIS    2025250     20200   21.1900  145.0500       8.3        89       899        98
VIS    2025250     20200   21.1900  145.0400       8.3        89       899        97
VIS    2025250     20200   21.1800  145.0000       9.2        88       901        93
VIS    2025250     20200   21.1600  144.9800       9.5        85       901        97
VIS    2025250     20200   21.1600  144.9500       9.5        85       901        97
VIS    2025250     20200   21.1600  144.9400       9.5        85       901        97
VIS    2025250     20200   21.1600  144.9000       9.7        82       902        96
VIS    2025250     20200   21.1700  144.8700       9.6        76       902        96
VIS    2025250     20200   21.1800  144.8600       9.1        77       902        97
VIS    2025250     20200   21.1700  144.8200       8.2        77       900        90
VIS    2025250     20200   21.1600  144.8000       7.9        76       900        92
VIS    2025250     20200   21.1700  144.7900       7.7        78       899        96
VIS    2025250     20200   21.1700  144.7500       8.2        81       901       100
VIS    2025250     20200   21.1600  144.7400       8.1        82       901       100
VIS    2025250     20200   21.1700  144.7100       7.8        86       902        99
VIS    2025250     20200   21.1600  144.6800       8.0        90       900        98
VIS    2025250     20200   21.1800  144.6500       8.6        89       897        97
VIS    2025250     20200   21.1700  144.6200       8.9        90       898        99
VIS    2025250     20200   21.1800  144.6000       8.9        89       899       100
VIS    2025250     20200   21.1600  144.5900       8.9        90       900        99
VIS    2025250     20200   21.1600  144.5500       8.9        88       903        99
VIS    2025250     20200   21.1800  144.5500       8.9        88       902       100
VIS    2025250     20200   21.1800  144.5200       8.8        89       904       100
VIS    2025250     20200   21.1700  144.4800       9.3        83       906        98
VIS    2025250     20200   21.1800  144.4700       9.6        82       906        98
VIS    2025250     20200   21.1800  144.4300       9.4        79       907        98
VIS    2025250     20200   21.1700  144.4100       9.1        78       908        98
VIS    2025250     20200   21.1600  144.4000       8.7        79       908        97
VIS    2025250     20200   21.1600  144.3600       8.5        82       903        96
VIS    2025250     20200   21.1800  144.3400       8.4        78       903        99
VIS    2025250     20200   21.1800  144.3100       8.3        79       903        99
VIS    2025250     20200   21.1700  144.2800       8.5        85       902        99
VIS    2025250     20200   21.1600  144.2600       8.5        82       902        96
VIS    2025250     20200   21.1600  144.2500       8.6        81       902        96
VIS    2025250     20200   21.1700  144.2100       8.1        77       904        97
VIS    2025250     20200   21.1800  144.1900       8.1        78       905        98
VIS    2025250     20200   21.1800  144.1700       7.9        79       905        98
VIS    2025250     20200   21.1600  144.1300       8.1        78       902        96
VIS    2025250     20200   21.1800  144.1100       8.2        80       904        98
VIS    2025250     20200   21.1700  144.0900       8.3        78       903        96
VIS    2025250     20200   21.1800  144.0700       8.6        77       904        95
VIS    2025250     20200   21.1700  144.0300       8.9        73       910        95
VIS    2025250     20200   21.1600  144.0100       9.1        75       910        97
VIS    2025250     20200   21.1600  143.9900       9.1        76       910        98
VIS    2025250     20200   21.1600  143.9600       9.0        79       910        98
VIS    2025250     20200   21.1700  143.9300       9.1        76       912        98
VIS    2025250     20200   21.1700  143.9200       8.7        75       913        98
VIS    2025250     20200   21.1700  143.8800       8.0        72       921        95
VIS    2025250     20200   21.1700  143.5500       9.6        89       924        98
VIS    2025250     20200   21.1500  143.5300       9.4        87       919        99
VIS    2025250     20200   21.1700  143.4900       9.9        83       919        99
VIS    2025250     20200   21.1700  143.4900       9.9        83       919        99
VIS    2025250     20200   21.1700  143.4400       9.9        79       918        98
VIS    2025250     20200   21.1700  143.4400       9.9        79       918        98
VIS    2025250     20200   21.1700  143.4000       9.7        79       918        98
VIS    2025250     20200   21.1500  143.3700       9.7        79       918        98
VIS    2025250     20200   21.1600  143.3500       9.5        77       918        94
VIS    2025250     20200   21.1600  143.3400       9.5        76       918        96
VIS    2025250     20200   21.1600  143.3000       9.3        78       917        97
VIS    2025250     20200   21.1600  143.2800       9.3        81       917        98
VIS    2025250     20200   21.1600  143.2600       9.3        87       916        99
VIS    2025250     20200   21.1700  143.2200       9.3        85       841        91
VIS    2025250     20200   21.1600  143.0500       9.4        97       842        90
VIS    2025250     20200   21.1700  143.0400       9.3        97       842        91
VIS    2025250     20200   21.1600  143.0100       9.3        98       842        95
VIS    2025250     20200   21.1500  142.9900       9.1       100       843        95
VIS    2025250     20200   21.1500  142.9700       9.2        95       843        92
VIS    2025250     20200   21.1600  142.8500       9.2        90       845        90
VIS    2025250     20200   21.1500  142.8300       9.3        89       852        91
VIS    2025250     20200   21.1700  142.8000       9.6        86       850        90
VIS    2025250     20200   21.1600  142.7800       9.0        83       893        92
VIS    2025250     20200   21.1600  142.7600       8.4        80       914        94
VIS    2025250     20200   21.1700  142.7400       8.3        82       914        92
VIS    2025250     20200   21.1700  142.7000       8.2        79       919        92
VIS    2025250     20200   21.1500  142.6500       9.0        66       978        90
VIS    2025250     20200   21.1500  142.4100       9.7        81       996        96
VIS    2025250     20200   21.1500  142.3900       9.4        82       982        92
VIS    2025250     20200   21.1500  142.3700       9.3        83       978        90
VIS    2025250     20200   21.1600  142.3600       9.3        80       970        95
VIS    2025250     20200   21.1500  142.3400       9.5        79       958        97
VIS    2025250     20200   21.1500  142.3100       9.7        81       946        99
VIS    2025250     20200   21.1500  142.2700       9.7        80       941        97
VIS    2025250     20200   21.1400  142.2400       9.2        81       945        95
VIS    2025250     20200   21.1500  142.2400       9.1        81       945        95
VIS    2025250     20200   21.1600  142.1900       8.8        88       974        90
VIS    2025250     20200   21.1400  142.1700       9.4        85       969        90
VIS    2025250     20200   21.1500  142.1500       9.4        85       961        93
VIS    2025250     20200   21.1400  142.1200       9.4        83       960        95
VIS    2025250     20200   21.1500  142.1000       9.6        82       960        97
VIS    2025250     20200   21.1500  142.0800       9.6        82       952        97
VIS    2025250     20200   21.1400  142.0500       9.5        80       921        96
VIS    2025250     20200   21.1400  142.0400       9.7        78       904        90
VIS    2025250     20200   21.1600  141.9700      10.1        78       900        90
VIS    2025250     20200   21.1600  141.9600      10.2        78       900        90
VIS    2025250     20200   21.1500  141.9400      10.2        81       893        90
VIS    2025250     20200   21.1400  141.9200       9.4        86       897        92
VIS    2025250     20200   21.1500  141.8900       9.4        84       923        97
VIS    2025250     20200   21.1500  141.7500      10.5        74       995        97
VIS    2025250     20200   21.1600  141.7300      10.7        74       995        93
VIS    2025250     20200   21.1600  141.7100      10.7        74       995        97
VIS    2025250     20200   21.1600  141.6900      10.3        79       990        95
VIS    2025250     20200   21.1400  141.6700      10.4        78       989        97
VIS    2025250     20200   21.1500  141.6400      10.1        80       977        98
VIS    2025250     20200   21.1600  141.6200      10.0        80       980        98
VIS    2025250     20200   21.1400  141.5800       9.8        79       968        97
VIS    2025250     20200   21.1500  141.5600      10.0        80       959        98
VIS    2025250     20200   21.1600  141.5400      10.2        83       959        98
VIS    2025250     20200   21.1600  141.5000      10.1        82       948        98
VIS    2025250     20200   21.1500  141.4800      10.1        80       927        95
VIS    2025250     20200   21.1500  141.4600      10.1        80       904        90
VIS    2025250     20200   21.1500  141.4400       9.9        79       913        93
VIS    2025250     20200   21.1600  141.3600      10.0        83       972        95
VIS    2025250     20200   21.1500  141.3400      10.1        85       973        96
VIS    2025250     20200   21.1600  141.3300      10.2        85       973        96
VIS    2025250     20200   21.1400  141.2900      10.3        80       932        94
VIS    2025250     20200   21.1600  141.2600      10.2        79       979        92
VIS    2025250     20200   21.1600  141.2300      10.1        82       994        95
VIS    2025250     20200   21.1500  141.2300       9.9        82       994        95
VIS    2025250     20200   21.1500  141.1400      10.5        84       988        90
VIS    2025250     20200   21.1400  141.1100      10.4        81       977        98
VIS    2025250     20200   21.1400  141.1100      10.4        81       969        98
VIS    2025250     20200   21.1600  140.6500      10.3        78       984        96
VIS    2025250     20200   21.1400  140.6200      10.8        76       975        99
VIS    2025250     20200   21.1500  140.6200      11.0        76       976        99
VIS    2025250     20200   21.1400  140.5800      10.9        78       975        99
VIS    2025250     20200   21.1400  140.5500      10.5        78       967        98
VIS    2025250     20200   21.1400  140.5400      10.4        77       965        98
VIS    2025250     20200   21.1600  140.5100      10.6        76       965        98
VIS    2025250     20200   21.1400  140.4900      10.4        80       963        99
VIS    2025250     20200   21.1400  140.4600       9.6        83       962        98
VIS    2025250     20200   21.1500  140.4200       9.7        81       944        99
VIS    2025250     20200   21.1400  140.4100       9.5        83       941        99
VIS    2025250     20200   21.1700  147.3400       6.9        88       981        92
VIS    2025250     20200   21.1600  146.5800       8.1        58       979        90
VIS    2025250     20200   21.1800  146.5700       7.2        66       953        94
VIS    2025250     20200   21.1700  146.5600       7.0        67       924        95
VIS    2025250     20200   21.1400  145.2100       8.6        89       963        90
VIS    2025250     20200   21.1500  145.1900       8.2        90       940        95
VIS    2025250     20200   21.1400  145.1700       8.3        89       916        98
VIS    2025250     20200   21.1500  145.1400       8.6        89       903        98
VIS    2025250     20200   21.1500  145.1100       8.8        94       901        96
VIS    2025250     20200   21.1600  145.0900       8.8        94       899        96
VIS    2025250     20200   21.1500  145.0600       8.8        89       898        99
VIS    2025250     20200   21.1400  145.0500       8.7        87       899        99
VIS    2025250     20200   21.1400  145.0100       8.9        83       901        99
VIS    2025250     20200   21.1400  144.9900       9.3        82       901        98
VIS    2025250     20200   21.1500  144.9800       9.5        84       901        97
VIS    2025250     20200   21.1400  144.9300       9.5        84       901        97
VIS    2025250     20200   21.1600  144.9100       9.7        82       902        95
VIS    2025250     20200   21.1500  144.8900       9.8        77       901        94
VIS    2025250     20200   21.1500  144.8700       9.7        73       901        95
VIS    2025250     20200   21.1500  144.8500       9.5        73       901        95
VIS    2025250     20200   21.1500  144.8300       8.8        75       900        93
VIS    2025250     20200   21.1600  144.8000       7.9        75       899        92
VIS    2025250     20200   21.1600  144.7800       7.7        76       900        97
VIS    2025250     20200   21.1500  144.7600       8.0        79       901       100
VIS    2025250     20200   21.1400  144.7100       7.9        85       901        98
VIS    2025250     20200   21.1500  144.7000       7.8        87       901        98
VIS    2025250     20200   21.1400  144.6800       8.0        89       900        96
VIS    2025250     20200   21.1400  144.6400       8.9        88       900        97
VIS    2025250     20200   21.1400  144.6300       9.1        88       900        99
VIS    2025250     20200   21.1600  144.6000       8.9        91       899        99
VIS    2025250     20200   21.1600  144.5800       8.9        89       902        98
VIS    2025250     20200   21.1500  144.5500       8.9        88       903        96
VIS    2025250     20200   21.1500  144.5100       8.7        91       903        98
VIS    2025250     20200   21.1400  144.5000       8.7        91       903        98
VIS    2025250     20200   21.1400  144.4500       8.9        81       903        94
VIS    2025250     20200   21.1400  144.4300       8.8        80       905        97
VIS    2025250     20200   21.1500  144.4000       8.6        79       910        97
VIS    2025250     20200   21.1300  144.3800       8.2        79       904        96
VIS    2025250     20200   21.1500  144.3600       8.4        81       902        95
VIS    2025250     20200   21.1300  144.3100       8.3        79       900        97
VIS    2025250     20200   21.1300  144.2900       8.3        80       900        95
VIS    2025250     20200   21.1500  144.2700       8.5        83       901        95
VIS    2025250     20200   21.1500  144.2500       8.6        81       902        95
VIS    2025250     20200   21.1300  144.2300       8.5        77       904        97
VIS    2025250     20200   21.1500  144.2000       8.1        78       904        98
VIS    2025250     20200   21.1300  144.1700       8.5        78       904        97
VIS    2025250     20200   21.1400  144.1400       8.2        78       901        94
VIS    2025250     20200   21.1500  144.1200       8.2        75       901        95
VIS    2025250     20200   21.1300  144.1100       8.4        73       901        96
VIS    2025250     20200   21.1400  144.0800       8.4        77       904        97
VIS    2025250     20200   21.1300  144.0400       8.7        79       911        99
VIS    2025250     20200   21.1400  144.0300       8.7        77       911        98
VIS    2025250     20200   21.1300  144.0100       8.8        77       911        98
VIS    2025250     20200   21.1300  143.9800       9.0        82       911        99
VIS    2025250     20200   21.1500  143.9500       8.9        81       911        98
VIS    2025250     20200   21.1500  143.9200       8.4        75       914        98
VIS    2025250     20200   21.1500  143.9100       8.4        72       916        97
VIS    2025250     20200   21.1300  143.8700       9.0        76       925        98
VIS    2025250     20200   21.1300  143.8600       9.2        77       926        99
VIS    2025250     20200   21.1300  143.6000       9.6        86       962        90
VIS    2025250     20200   21.1400  143.5800       9.6        89       938        96
VIS    2025250     20200   21.1400  143.5500       9.6        88       921        99
VIS    2025250     20200   21.1300  143.5200       9.7        87       919        99
VIS    2025250     20200   21.1500  143.4900       9.8        85       919        99
VIS    2025250     20200   21.1300  143.4600       9.4        84       919        98
VIS    2025250     20200   21.1300  143.4400       9.5        87       919        97
VIS    2025250     20200   21.1300  143.4200       9.5        87       919        98
VIS    2025250     20200   21.1400  143.4000       9.8        83       918        97
VIS    2025250     20200   21.1400  143.3600       9.9        78       918        97
VIS    2025250     20200   21.1400  143.3600       9.9        79       918        97
VIS    2025250     20200   21.1400  143.3200       9.5        79       918        98
VIS    2025250     20200   21.1300  143.2900       9.6        83       918        99
VIS    2025250     20200   21.1300  143.2800       9.6        85       917        99
VIS    2025250     20200   21.1500  143.2400       9.2        89       843        91
VIS    2025250     20200   21.1400  143.2300       9.2        89       841        90
VIS    2025250     20200   21.1300  143.2000       9.3        90       835        92
VIS    2025250     20200   21.1300  143.1600       9.4        93       835        93
VIS    2025250     20200   21.1400  143.1600       9.4        93       835        91
VIS    2025250     20200   21.1300  143.1200       9.6        93       836        93
VIS    2025250     20200   21.1300  143.0700       9.4        98       842        95
VIS    2025250     20200   21.1400  143.0600       9.4        98       842        94
VIS    2025250     20200   21.1400  143.0200       9.2        95       843        94
VIS    2025250     20200   21.1400  143.0100       9.2        96       843        94
VIS    2025250     20200   21.1400  142.9900       8.8        99       844        94
VIS    2025250     20200   21.1300  142.9000      10.1        93       850        94
VIS    2025250     20200   21.1400  142.8700       9.5        93       850        95
VIS    2025250     20200   21.1300  142.8500       9.1        91       881        94
VIS    2025250     20200   21.1200  142.8200       9.0        87       899        96
VIS    2025250     20200   21.1400  142.8000       9.2        86       881        91
VIS    2025250     20200   21.1400  142.7800       8.4        80       914        94
VIS    2025250     20200   21.1400  142.7500       8.0        78       914        91
VIS    2025250     20200   21.1400  142.7400       8.2        78       913        92
VIS    2025250     20200   21.1300  142.6300       9.2        65       967        90
VIS    2025250     20200   21.1400  142.4200       9.9        84       991        97
VIS    2025250     20200   21.1300  142.3900       9.4        85       982        95
VIS    2025250     20200   21.1300  142.3700       9.5        86       976        95
VIS    2025250     20200   21.1200  142.3500      10.0        85       962        97
VIS    2025250     20200   21.1200  142.3300      10.1        84       960        97
VIS    2025250     20200   21.1300  142.3100       9.9        81       951        97
VIS    2025250     20200   21.1200  142.2700      10.1        82       945        98
VIS    2025250     20200   21.1300  142.2500       9.5        80       945        97
VIS    2025250     20200   21.1200  142.2200       8.8        81       945        95
VIS    2025250     20200   21.1200  142.2200       8.7        81       945        94
VIS    2025250     20200   21.1200  142.1800       9.4        83       961        93
VIS    2025250     20200   21.1400  142.1600       9.4        85       964        91
VIS    2025250     20200   21.1200  142.1300       9.5        76       939        96
VIS    2025250     20200   21.1300  142.1100       9.5        79       939        98
VIS    2025250     20200   21.1400  142.0800       9.6        81       932        97
VIS    2025250     20200   21.1200  142.0500       9.6        75       909        90
VIS    2025250     20200   21.1300  142.0400       9.6        77       909        91
VIS    2025250     20200   21.1400  141.9400       9.8        83       879        90
VIS    2025250     20200   21.1200  141.9200       9.2        87       897        93
VIS    2025250     20200   21.1200  141.7800      10.5        77       997        98
VIS    2025250     20200   21.1200  141.7500       9.9        77       981        97
VIS    2025250     20200   21.1200  141.7400       9.9        78       967        97
VIS    2025250     20200   21.1200  141.7100      10.0        77       967        98
VIS    2025250     20200   21.1200  141.6700      10.2        75       924        93
VIS    2025250     20200   21.1400  141.6600      10.2        78       989        98
VIS    2025250     20200   21.1400  141.6300       9.9        80       964        98
VIS    2025250     20200   21.1300  141.6000       9.8        79       932        97
VIS    2025250     20200   21.1300  141.5800       9.7        80       935        97
VIS    2025250     20200   21.1200  141.5500       9.8        78       932        96
VIS    2025250     20200   21.1300  141.5400       9.9        78       927        96
VIS    2025250     20200   21.1200  141.3800       9.6        87       921        90
VIS    2025250     20200   21.1200  141.3700       9.7        87       935        93
VIS    2025250     20200   21.1300  141.3300      10.2        85       971        95
VIS    2025250     20200   21.1200  141.3100      10.1        83       921        94
VIS    2025250     20200   21.1200  141.2800       9.9        80       937        97
VIS    2025250     20200   21.1100  141.2500       9.5        80       975        96
VIS    2025250     20200   21.1200  141.2200       9.6        79       981        95
VIS    2025250     20200   21.1200  141.2000       9.8        80       981        92
VIS    2025250     20200   21.1200  141.1700      10.0        81       981        90
VIS    2025250     20200   21.1100  141.1400      10.0        81       973        96
VIS    2025250     20200   21.1100  140.7600       9.8        85       995        96
VIS    2025250     20200   21.1100  140.7200      10.0        82       968       100
VIS    2025250     20200   21.1100  140.7100      10.1        82       968       100
VIS    2025250     20200   21.1100  140.6900      10.4        80       968       100
VIS    2025250     20200   21.1200  140.6600      10.4        77       977        99
VIS    2025250     20200   21.1300  140.6200      10.6        76       977        99
VIS    2025250     20200   21.1300  140.6000      10.7        76       970        99
VIS    2025250     20200   21.1200  140.5700      10.9        73       967        96
VIS    2025250     20200   21.1300  140.5600      10.7        75       967        98
VIS    2025250     20200   21.1300  140.5400      10.5        77       965        98
VIS    2025250     20200   21.1200  140.5100      10.5        78       962        99
VIS    2025250     20200   21.1300  140.4900      10.2        81       963        99
VIS    2025250     20200   21.1200  140.4500       9.6        82       945        98
VIS    2025250     20200   21.1200  140.4400       9.6        82       941        97
VIS    2025250     20200   21.1100  140.4100       9.5        81       922        93
VIS    2025250     20200   21.1500  147.3300       5.7        83       986        95
VIS    2025250     20200   21.1500  147.3300       5.5        83       986        97
VIS    2025250     20200   21.1400  146.5700       7.3        60       930        90
VIS    2025250     20200   21.1400  146.5600       7.0        65       914        94
VIS    2025250     20200   21.1300  146.5400       6.1        74       914        90
VIS    2025250     20200   21.1500  146.4900       5.1        74       943        97
VIS    2025250     20200   21.1400  146.4900       5.0        70       943        93
VIS    2025250     20200   21.1300  145.2600       9.3        87       987        90
VIS    2025250     20200   21.1200  145.1900       9.0        87       943        93
VIS    2025250     20200   21.1200  145.1900       9.0        87       943        94
VIS    2025250     20200   21.1400  145.1600       8.5        89       913        98
VIS    2025250     20200   21.1200  145.1200       8.9        91       904        98
VIS    2025250     20200   21.1200  145.1100       8.9        90       904        97
VIS    2025250     20200   21.1100  145.0700       9.0        89       903        97
VIS    2025250     20200   21.1200  145.0500       8.9        88       899        98
VIS    2025250     20200   21.1200  145.0200       8.9        86       899        99
VIS    2025250     20200   21.1300  145.0000       9.2        82       901        98
VIS    2025250     20200   21.1200  144.9800       9.4        82       901        97
VIS    2025250     20200   21.1100  144.9500       9.5        83       901        93
VIS    2025250     20200   21.1300  144.9300       9.5        83       900        97
VIS    2025250     20200   21.1300  144.8900       9.6        78       900        96
VIS    2025250     20200   21.1200  144.8700       9.3        76       900        97
VIS    2025250     20200   21.1100  144.8600       9.1        77       900        97
VIS    2025250     20200   21.1300  144.8400       9.1        75       900        96
VIS    2025250     20200   21.1100  144.8100       8.0        80       899        97
VIS    2025250     20200   21.1300  144.7800       8.0        75       901        97
VIS    2025250     20200   21.1200  144.7600       8.2        79       900        99
VIS    2025250     20200   21.1300  144.7300       8.0        85       902       100
VIS    2025250     20200   21.1300  144.7100       8.0        87       901        96
VIS    2025250     20200   21.1200  144.6800       8.0        92       901        93
VIS    2025250     20200   21.1200  144.6500       9.0        88       900        97
VIS    2025250     20200   21.1100  144.6300       9.4        87       903        98
VIS    2025250     20200   21.1300  144.6000       9.1        89       903        99
VIS    2025250     20200   21.1200  144.5800       8.9        89       904        96
VIS    2025250     20200   21.1200  144.5500       8.9        88       904        95
VIS    2025250     20200   21.1200  144.5300       8.9        88       904        96
VIS    2025250     20200   21.1300  144.5100       8.6        92       903        96
VIS    2025250     20200   21.1100  144.4800       8.0        81       903        90
VIS    2025250     20200   21.1100  144.4500       8.0        81       903        99
VIS    2025250     20200   21.1200  144.4300       8.4        80       905        99
VIS    2025250     20200   21.1300  144.4000       8.3        79       909        99
VIS    2025250     20200   21.1100  144.3900       8.2        82       902        98
VIS    2025250     20200   21.1200  144.3500       8.0        79       901        96
VIS    2025250     20200   21.1100  144.3300       8.1        78       900        98
VIS    2025250     20200   21.1300  144.3000       8.3        79       900        94
VIS    2025250     20200   21.1100  144.2800       8.2        75       901        94
VIS    2025250     20200   21.1200  144.2600       8.4        76       901        96
VIS    2025250     20200   21.1200  144.2400       8.4        76       903        97
VIS    2025250     20200   21.1100  144.2000       8.4        75       904        96
VIS    2025250     20200   21.1100  144.1900       8.5        75       906        94
VIS    2025250     20200   21.1200  144.1700       8.1        77       904        95
VIS    2025250     20200   21.1100  144.1400       7.7        75       903        96
VIS    2025250     20200   21.1300  144.1100       8.4        74       901        95
VIS    2025250     20200   21.1300  144.0900       8.4        74       903        97
VIS    2025250     20200   21.1100  144.0500       8.4        78       913        99
VIS    2025250     20200   21.1100  144.0400       8.4        77       915        99
VIS    2025250     20200   21.1100  144.0100       8.8        80       912        99
VIS    2025250     20200   21.1100  143.9900       9.0        82       912        99
VIS    2025250     20200   21.1100  143.9500       9.0        77       919        91
VIS    2025250     20200   21.1200  143.8800       9.1        79       925        98
VIS    2025250     20200   21.1200  143.8600       9.2        79       926        99
VIS    2025250     20200   21.1100  143.6200       9.8        85       976        95
VIS    2025250     20200   21.1200  143.6100       9.6        85       962        92
VIS    2025250     20200   21.1200  143.5900       9.9        87       938        98
VIS    2025250     20200   21.1000  143.5500      10.2        86       919        99
VIS    2025250     20200   21.1000  143.5200      10.1        86       919        99
VIS    2025250     20200   21.1000  143.5100      10.0        86       919        98
VIS    2025250     20200   21.1100  143.4800       9.6        82       918        97
VIS    2025250     20200   21.1200  143.4500       9.4        86       919        96
VIS    2025250     20200   21.1100  143.4200       9.7        89       918        98
VIS    2025250     20200   21.1100  143.3900      10.0        87       918        99
VIS    2025250     20200   21.1200  143.3800      10.2        83       918        98
VIS    2025250     20200   21.1100  143.3500      10.2        80       918        97
VIS    2025250     20200   21.1100  143.3300       9.9        81       918        98
VIS    2025250     20200   21.1200  143.3000       9.6        82       918        99
VIS    2025250     20200   21.1200  143.2700       9.5        87       917        99
VIS    2025250     20200   21.1000  143.2600       9.5        89       918        99
VIS    2025250     20200   21.1000  143.2400       9.6        94       842        95
VIS    2025250     20200   21.1000  143.2000       9.1        93       837        93
VIS    2025250     20200   21.1000  143.1900       9.0        92       837        92
VIS    2025250     20200   21.1100  143.1300       9.6        93       836        92
VIS    2025250     20200   21.1000  143.1200       9.7        97       842        95
VIS    2025250     20200   21.1100  143.0800       9.9        99       843        97
VIS    2025250     20200   21.1200  143.0700       9.8        97       843        97
VIS    2025250     20200   21.1200  143.0200       8.9        94       845        92
VIS    2025250     20200   21.1000  143.0100       8.7        94       881        96
VIS    2025250     20200   21.1000  142.9900       7.9       102       881        92
VIS    2025250     20200   21.1000  142.9100       9.5        87       887        93
VIS    2025250     20200   21.1100  142.9000      10.0        95       861        96
VIS    2025250     20200   21.1000  142.8600       9.4        94       893        98
VIS    2025250     20200   21.1000  142.8300       8.6        82       914        94
VIS    2025250     20200   21.1000  142.8000       8.3        76       932        92
VIS    2025250     20200   21.1000  142.7800       8.2        77       929        92
VIS    2025250     20200   21.1000  142.7700       8.3        79       914        92
VIS    2025250     20200   21.1100  142.7500       8.2        82       912        91
VIS    2025250     20200   21.1000  142.6900       8.2        73       937        92
VIS    2025250     20200   21.1100  142.4100      10.3        93       976        94
VIS    2025250     20200   21.0900  142.3800      10.1        94       968        93
VIS    2025250     20200   21.0900  142.3700       9.5        92       968        93
VIS    2025250     20200   21.1000  142.3300       9.9        87       962        96
VIS    2025250     20200   21.1100  142.3000      10.0        82       954        98
VIS    2025250     20200   21.0900  142.2800      10.0        83       934       100
VIS    2025250     20200   21.1000  142.2500       9.6        81       934        99
VIS    2025250     20200   21.1000  142.2500       9.4        81       934        99
VIS    2025250     20200   21.0900  142.2100       9.2        79       939        96
VIS    2025250     20200   21.0900  142.1900       9.6        81       940        97
VIS    2025250     20200   21.0900  142.1600       9.5        78       940        95
VIS    2025250     20200   21.1100  142.1300       9.5        74       937        96
VIS    2025250     20200   21.1100  142.1300       9.5        75       937        96
VIS    2025250     20200   21.1000  142.0800       9.8        75       928        93
VIS    2025250     20200   21.0900  142.0800       9.8        74       926        92
VIS    2025250     20200   21.1000  141.9400       9.3        80       893        90
VIS    2025250     20200   21.1000  141.9300       9.2        81       897        91
VIS    2025250     20200   21.1100  141.7800       9.8        79       985        97
VIS    2025250     20200   21.1100  141.7500       9.8        78       981        97
VIS    2025250     20200   21.1100  141.7500       9.8        78       967        97
VIS    2025250     20200   21.1000  141.7100      10.0        76       961        98
VIS    2025250     20200   21.1100  141.6900      10.1        74       930        95
VIS    2025250     20200   21.1000  141.5900       9.7        83       910        93
VIS    2025250     20200   21.1100  141.5600       9.7        80       927        96
VIS    2025250     20200   21.0900  141.3600       9.9        87       962        94
VIS    2025250     20200   21.0900  141.3500       9.9        86       962        95
VIS    2025250     20200   21.1100  141.3200       9.8        83       921        95
VIS    2025250     20200   21.1000  141.3000       9.8        80       921        94
VIS    2025250     20200   21.1100  141.2500       9.5        81       971        95
VIS    2025250     20200   21.1000  141.2100       9.7        80       981        96
VIS    2025250     20200   21.0900  141.1900       9.8        82       981        94
VIS    2025250     20200   21.1000  141.1600       9.7        81       969        95
VIS    2025250     20200   21.1000  141.1600       9.6        82       967        95
VIS    2025250     20200   21.1000  140.7500       9.7        84       995        98
VIS    2025250     20200   21.1000  140.7400       9.6        82       995        98
VIS    2025250     20200   21.1100  140.7200       9.9        82       973        99
VIS    2025250     20200   21.1000  140.6900      10.3        80       968       100
VIS    2025250     20200   21.0900  140.6600      10.3        78       965        99
VIS    2025250     20200   21.1000  140.6400      10.3        76       965        98
VIS    2025250     20200   21.1000  140.6200      10.2        76       965        97
VIS    2025250     20200   21.0900  140.5900      10.0        76       955        97
VIS    2025250     20200   21.1100  140.5600      10.6        72       962        96
VIS    2025250     20200   21.1100  140.5500      10.6        74       962        96
VIS    2025250     20200   21.1000  140.5100      10.4        76       945        97
VIS    2025250     20200   21.0800  140.5000       9.9        77       928        91
VIS    2025250     20200   21.0800  140.4600       9.5        82       919        92
VIS    2025250     20200   21.0800  140.4400       9.4        83       916        91
VIS    2025250     20200   21.1000  140.4100       9.5        81       922        93
VIS    2025250     20200   21.1200  147.3300       5.7        74       986        97
VIS    2025250     20200   21.1200  146.5800       7.1        62       914        91
VIS    2025250     20200   21.1200  146.5700       6.9        66       914        95
VIS    2025250     20200   21.0900  145.2600       8.8        85       975        92
VIS    2025250     20200   21.1100  145.2100       9.0        88       971        90
VIS    2025250     20200   21.1100  145.1900       9.0        87       943        93
VIS    2025250     20200   21.1000  145.1700       8.9        88       917        96
VIS    2025250     20200   21.1000  145.1300       8.8        90       905        98
VIS    2025250     20200   21.0900  145.1300       8.7        90       905        98
VIS    2025250     20200   21.1000  145.0800       9.0        88       905        98
VIS    2025250     20200   21.1000  145.0800       9.0        88       905        97
VIS    2025250     20200   21.0900  145.0500       9.3        87       901        97
VIS    2025250     20200   21.1000  145.0200       9.1        85       899        98
VIS    2025250     20200   21.1100  144.9800       9.2        84       901        96
VIS    2025250     20200   21.1000  144.9600       9.4        84       901        93
VIS    2025250     20200   21.0900  144.9400       9.2        79       901        95
VIS    2025250     20200   21.0900  144.9300       9.2        79       900        95
VIS    2025250     20200   21.1000  144.8800       9.3        77       900        93
VIS    2025250     20200   21.1000  144.8700       9.0        78       900        97
VIS    2025250     20200   21.1000  144.8400       8.1        82       899        99
VIS    2025250     20200   21.1000  144.8100       7.7        82       899        96
VIS    2025250     20200   21.0900  144.8000       7.5        86       899        97
VIS    2025250     20200   21.1000  144.7800       7.5        84       899        93
VIS    2025250     20200   21.1000  144.7400       7.9        88       900        97
VIS    2025250     20200   21.1100  144.7200       7.4        94       900        92
VIS    2025250     20200   21.1000  144.6800       7.8        95       901        91
VIS    2025250     20200   21.1000  144.6800       7.9        93       901        91
VIS    2025250     20200   21.1000  144.6400       9.0        88       901        98
VIS    2025250     20200   21.1000  144.6200       9.4        87       904        98
VIS    2025250     20200   21.0900  144.6000       9.2        86       905        99
VIS    2025250     20200   21.0900  144.5600       8.8        86       905        96
VIS    2025250     20200   21.0800  144.5500       8.9        84       905        96
VIS    2025250     20200   21.0900  144.5200       8.9        80       904        96
VIS    2025250     20200   21.0900  144.4900       8.5        74       903        90
VIS    2025250     20200   21.0900  144.4700       7.9        78       903        95
VIS    2025250     20200   21.1000  144.4500       7.9        81       903        99
VIS    2025250     20200   21.1000  144.4300       8.1        83       902        99
VIS    2025250     20200   21.1000  144.3900       8.1        83       902        98
VIS    2025250     20200   21.1000  144.3800       8.0        82       901        98
VIS    2025250     20200   21.1000  144.3500       8.0        80       900        98
VIS    2025250     20200   21.0900  144.3300       8.0        79       900        98
VIS    2025250     20200   21.0900  144.3000       8.2        77       901        98
VIS    2025250     20200   21.0900  144.2800       8.0        75       903        98
VIS    2025250     20200   21.1000  144.2600       8.1        75       901        97
VIS    2025250     20200   21.1000  144.2200       8.4        75       905        97
VIS    2025250     20200   21.0900  144.2000       8.6        74       906        97
VIS    2025250     20200   21.0800  144.1600       8.0        73       904        95
VIS    2025250     20200   21.0800  144.1500       7.8        73       904        94
VIS    2025250     20200   21.0900  144.1300       7.6        74       903        92
VIS    2025250     20200   21.0800  144.1000       7.9        79       906        95
VIS    2025250     20200   21.1000  144.0700       7.7        74       910        97
VIS    2025250     20200   21.0800  144.0600       7.7        75       913        96
VIS    2025250     20200   21.1000  144.0400       8.4        77       915        99
VIS    2025250     20200   21.0800  144.0000       8.6        82       917       100
VIS    2025250     20200   21.0800  143.9700       8.8        76       921        95
VIS    2025250     20200   21.0900  143.9000       8.6        88       927        91
VIS    2025250     20200   21.0800  143.6000      10.0        88       955        97
VIS    2025250     20200   21.0900  143.6000      10.1        88       955        97
VIS    2025250     20200   21.0800  143.5700      10.1        90       930        98
VIS    2025250     20200   21.0900  143.5400      10.3        88       919        97
VIS    2025250     20200   21.1000  143.5100      10.1        86       919        98
VIS    2025250     20200   21.0900  143.5000       9.8        83       918        98
VIS    2025250     20200   21.1000  143.4300       9.8        88       918        97
VIS    2025250     20200   21.1000  143.4100       9.8        90       918        99
VIS    2025250     20200   21.0800  143.3900       9.9        86       918        99
VIS    2025250     20200   21.0900  143.3600      10.2        80       919        97
VIS    2025250     20200   21.0900  143.3500      10.2        80       919        96
VIS    2025250     20200   21.0700  143.3100       9.9        89       920        99
VIS    2025250     20200   21.0800  143.3000       9.8        88       920        99
VIS    2025250     20200   21.0700  143.2600       9.6        91       921        97
VIS    2025250     20200   21.0700  143.2300       9.7        96       848        95
VIS    2025250     20200   21.0700  143.2100       9.3        94       848        95
VIS    2025250     20200   21.0700  143.1800       9.1        89       843        92
VIS    2025250     20200   21.0700  143.1800       9.2        89       842        91
VIS    2025250     20200   21.0800  143.1600       9.5        91       838        93
VIS    2025250     20200   21.0800  143.1300       9.9        98       846        96
VIS    2025250     20200   21.0900  143.1000       9.9       105       847        95
VIS    2025250     20200   21.0800  143.0600      11.0       106       909        95
VIS    2025250     20200   21.0900  143.0400      10.3       101       909        91
VIS    2025250     20200   21.0900  143.0100       8.7        92       881        97
VIS    2025250     20200   21.0900  143.0100       8.7        92       881        97
VIS    2025250     20200   21.0900  142.9700       8.1       101       912        93
VIS    2025250     20200   21.0700  142.9400       8.1        85       929        95
VIS    2025250     20200   21.0700  142.9300       8.5        84       919        96
VIS    2025250     20200   21.0900  142.9000       9.3        89       893        97
VIS    2025250     20200   21.0900  142.8800       9.4        95       893        99
VIS    2025250     20200   21.0700  142.8400       8.4        79       929        92
VIS    2025250     20200   21.0800  142.8200       8.5        74       931        93
VIS    2025250     20200   21.0900  142.8100       8.4        75       931        93
VIS    2025250     20200   21.0900  142.7900       8.3        77       932        92
VIS    2025250     20200   21.0800  142.7600       9.1        84       914        93
VIS    2025250     20200   21.0800  142.7200       8.6        80       936        93
VIS    2025250     20200   21.0800  142.7000       8.1        77       937        92
VIS    2025250     20200   21.0700  142.6800       8.0        76       944        91
VIS    2025250     20200   21.0700  142.4400      10.4        90       992        91
VIS    2025250     20200   21.0700  142.4400      10.9        92       991        91
VIS    2025250     20200   21.0800  142.4000      11.0        95       976        91
VIS    2025250     20200   21.0900  142.3900      10.4        94       968        92
VIS    2025250     20200   21.0700  142.3500       9.4        88       953        96
VIS    2025250     20200   21.0800  142.3200       9.8        86       948        97
VIS    2025250     20200   21.0700  142.3000       9.8        85       921        98
VIS    2025250     20200   21.0800  142.2800      10.0        84       934        99
VIS    2025250     20200   21.0900  142.2500       9.3        82       930        98
VIS    2025250     20200   21.0700  142.2200       9.3        78       934        95
VIS    2025250     20200   21.0700  142.1900       9.7        79       934        97
VIS    2025250     20200   21.0700  142.1900       9.7        79       934        98
VIS    2025250     20200   21.0800  142.1600       9.4        77       939        95
VIS    2025250     20200   21.0700  142.1400       9.4        72       926        90
VIS    2025250     20200   21.0800  142.1100       9.8        73       928        93
VIS    2025250     20200   21.0800  142.0900      10.0        69       926        90
VIS    2025250     20200   21.0700  141.7800       9.8        82       983        95
VIS    2025250     20200   21.0800  141.7700       9.8        81       981        95
VIS    2025250     20200   21.0800  141.7500       9.9        79       967        96
VIS    2025250     20200   21.0800  141.7200       9.9        77       930        95
VIS    2025250     20200   21.0800  141.6000       9.6        83       885        90
VIS    2025250     20200   21.0600  141.5600       9.8        84       885        90
VIS    2025250     20200   21.0800  141.4000       9.2        85       921        92
VIS    2025250     20200   21.0800  141.3600      10.0        87       962        95
VIS    2025250     20200   21.0800  141.3500      10.1        86       961        96
VIS    2025250     20200   21.0700  141.3300       9.9        81       919        94
VIS    2025250     20200   21.0700  141.2900      10.0        82       921        95
VIS    2025250     20200   21.0800  141.2800       9.9        82       942        99
VIS    2025250     20200   21.0700  141.2500      10.2        83       981        98
VIS    2025250     20200   21.0600  141.2100       9.9        83       982        96
VIS    2025250     20200   21.0700  141.1800       9.2        82       967        95
VIS    2025250     20200   21.0800  140.7700       9.5        81       995        95
VIS    2025250     20200   21.0600  140.7600       9.6        79       994        97
VIS    2025250     20200   21.0800  140.7400       9.7        81       979        98
VIS    2025250     20200   21.0700  140.6900       9.9        82       954        99
VIS    2025250     20200   21.0600  140.6800       9.7        82       957        98
VIS    2025250     20200   21.0700  140.6500      10.1        76       958        97
VIS    2025250     20200   21.0700  140.6400      10.2        75       958        96
VIS    2025250     20200   21.0600  140.6100      10.1        76       955        97
VIS    2025250     20200   21.0600  140.5800      10.0        78       950        98
VIS    2025250     20200   21.0800  140.5500      10.3        73       948        96
VIS    2025250     20200   21.0600  140.5200       9.8        78       934        94
VIS    2025250     20200   21.0700  140.4900       9.8        79       928        92
VIS    2025250     20200   21.0600  140.4600       9.4        82       919        91
VIS    2025250     20200   21.1000  147.7600       4.6        70       963        95
VIS    2025250     20200   21.1100  147.3400       5.9        71       986        91
VIS    2025250     20200   21.0800  146.5900       6.8        73       945        92
VIS    2025250     20200   21.1000  146.5800       6.7        69       945        90
VIS    2025250     20200   21.0900  146.5600       6.5        76       909        94
VIS    2025250     20200   21.0800  146.5100       5.5        77       951        90
VIS    2025250     20200   21.0700  145.3400      10.0        74       954        91
VIS    2025250     20200   21.0700  145.3200       9.9        74       968        90
VIS    2025250     20200   21.0700  145.2700       9.2        80       975        92
VIS    2025250     20200   21.0700  145.2600       8.9        82       975        93
VIS    2025250     20200   21.0700  145.2300       8.5        87       971        90
VIS    2025250     20200   21.0700  145.1700       8.8        87       917        98
VIS    2025250     20200   21.0700  145.1600       8.8        88       915        97
VIS    2025250     20200   21.0700  145.1200       8.6        89       905        98
VIS    2025250     20200   21.0800  145.1100       8.8        88       905        98
VIS    2025250     20200   21.0700  145.0800       9.2        86       905        98
VIS    2025250     20200   21.0800  145.0500       9.4        86       901        97
VIS    2025250     20200   21.0800  145.0300       9.4        84       899        97
VIS    2025250     20200   21.0600  145.0100       9.6        80       899        97
VIS    2025250     20200   21.0700  144.9900       9.4        82       899        97
VIS    2025250     20200   21.0700  144.9500       9.3        80       901        95
VIS    2025250     20200   21.0600  144.9300       9.3        76       901        95
VIS    2025250     20200   21.0800  144.8700       8.8        72       900        92
VIS    2025250     20200   21.0600  144.8300       8.0        80       899        99
VIS    2025250     20200   21.0800  144.8000       7.4        86       899        97
VIS    2025250     20200   21.0800  144.7900       7.4        85       899        97
VIS    2025250     20200   21.0700  144.7500       7.6        90       900        97
VIS    2025250     20200   21.0600  144.7400       7.7        89       902        95
VIS    2025250     20200   21.0700  144.7000       7.7        92       901        95
VIS    2025250     20200   21.0700  144.6700       8.4        89       900       100
VIS    2025250     20200   21.0600  144.6600       9.0        83       902        99
VIS    2025250     20200   21.0800  144.6200       9.3        86       905        98
VIS    2025250     20200   21.0800  144.6000       9.1        85       905        99
VIS    2025250     20200   21.0700  144.5700       8.9        84       905        98
VIS    2025250     20200   21.0600  144.5500       8.8        83       905        99
VIS    2025250     20200   21.0600  144.5400       8.9        81       905        99
VIS    2025250     20200   21.0700  144.5200       8.9        75       904        95
VIS    2025250     20200   21.0700  144.4900       8.5        70       904        92
VIS    2025250     20200   21.0600  144.4600       7.6        77       903        96
VIS    2025250     20200   21.0600  144.4400       7.3        83       903        97
VIS    2025250     20200   21.0800  144.4000       7.7        85       902        98
VIS    2025250     20200   21.0700  144.3900       7.6        83       902        97
VIS    2025250     20200   21.0600  144.3700       7.7        82       902        96
VIS    2025250     20200   21.0600  144.3300       8.1        81       905        99
VIS    2025250     20200   21.0800  144.3100       8.1        79       903        99
VIS    2025250     20200   21.0800  144.2900       8.2        78       904        99
VIS    2025250     20200   21.0600  144.2700       8.2        77       907        98
VIS    2025250     20200   21.0600  144.2300       8.2        76       905        97
VIS    2025250     20200   21.0600  144.2200       8.4        76       905        98
VIS    2025250     20200   21.0800  144.1900       8.7        73       906        92
VIS    2025250     20200   21.0700  144.1700       8.4        72       904        90
VIS    2025250     20200   21.0600  144.1300       8.1        76       905        94
VIS    2025250     20200   21.0800  144.1000       7.8        79       906        95
VIS    2025250     20200   21.0800  144.1000       7.8        79       906        95
VIS    2025250     20200   21.0700  144.0600       7.8        74       915        94
VIS    2025250     20200   21.0800  144.0300       8.1        79       915        99
VIS    2025250     20200   21.0700  144.0000       8.6        82       919       100
VIS    2025250     20200   21.0800  144.0000       8.6        81       917       100
VIS    2025250     20200   21.0500  143.9600       8.4        77       923        94
VIS    2025250     20200   21.0600  143.9200       9.3        96       921        91
VIS    2025250     20200   21.0500  143.6200      10.3        82       974        93
VIS    2025250     20200   21.0700  143.6000      10.1        86       943        98
VIS    2025250     20200   21.0500  143.5900      10.3        85       929        99
VIS    2025250     20200   21.0500  143.5400       9.9        84       918        98
VIS    2025250     20200   21.0600  143.5300      10.0        81       918        98
VIS    2025250     20200   21.0600  143.4900       9.9        69       918        93
VIS    2025250     20200   21.0600  143.4600       9.9        68       918        91
VIS    2025250     20200   21.0600  143.4400       9.8        75       918        94
VIS    2025250     20200   21.0700  143.4000       9.7        84       918        99
VIS    2025250     20200   21.0700  143.3800       9.9        81       919        97
VIS    2025250     20200   21.0600  143.3500       9.8        84       919        97
VIS    2025250     20200   21.0500  143.3300       9.7        89       921       100
VIS    2025250     20200   21.0600  143.3100       9.9        91       922        99
VIS    2025250     20200   21.0500  143.2800       9.9        90       926        97
VIS    2025250     20200   21.0700  143.2500       9.7        93       921        97
VIS    2025250     20200   21.0700  143.2300       9.7        96       904        97
VIS    2025250     20200   21.0700  143.2100       9.3        95       848        95
VIS    2025250     20200   21.0600  143.0100       8.2        85       948        94
VIS    2025250     20200   21.0500  142.9800       8.3        80       934        94
VIS    2025250     20200   21.0700  142.9600       7.9        86       929        95
VIS    2025250     20200   21.0500  142.9300       8.9        83       914        95
VIS    2025250     20200   21.0600  142.9200       9.0        83       914        95
VIS    2025250     20200   21.0600  142.9000       9.4        83       914        96
VIS    2025250     20200   21.0500  142.8600       8.8        72       929        94
VIS    2025250     20200   21.0500  142.8400       8.6        71       929        92
VIS    2025250     20200   21.0500  142.8000       8.8        76       917        95
VIS    2025250     20200   21.0500  142.7900       9.0        78       917        96
VIS    2025250     20200   21.0700  142.7700       9.1        81       914        96
VIS    2025250     20200   21.0500  142.7300       8.7        78       926        96
VIS    2025250     20200   21.0700  142.7200       8.4        78       936        93
VIS    2025250     20200   21.0600  142.4500      10.3        90       991        94
VIS    2025250     20200   21.0400  142.4200      10.2        88       964        97
VIS    2025250     20200   21.0600  142.4100      11.0        91       964        96
VIS    2025250     20200   21.0600  142.3800      10.1        87       959        97
VIS    2025250     20200   21.0600  142.3500       9.2        86       953        95
VIS    2025250     20200   21.0600  142.3300       9.5        87       913        97
VIS    2025250     20200   21.0600  142.3100       9.8        87       916        98
VIS    2025250     20200   21.0600  142.2900       9.7        84       913        96
VIS    2025250     20200   21.0600  142.2500       9.3        82       921        97
VIS    2025250     20200   21.0600  142.2300       9.3        79       931        95
VIS    2025250     20200   21.0500  142.2000       9.7        77       923        94
VIS    2025250     20200   21.0500  142.1800       9.5        78       911        92
VIS    2025250     20200   21.0500  141.9300       9.7        82       886        91
VIS    2025250     20200   21.0600  141.7700      10.0        81       983        97
VIS    2025250     20200   21.0500  141.7400      10.2        78       966        98
VIS    2025250     20200   21.0400  141.5700      10.3        84       877        90
VIS    2025250     20200   21.0400  141.4100       9.2        87       975        93
VIS    2025250     20200   21.0400  141.3800      10.6        89       939        99
VIS    2025250     20200   21.0400  141.3700      10.8        89       939        99
VIS    2025250     20200   21.0600  141.2400      10.4        82       980        96
VIS    2025250     20200   21.0600  141.2200       9.9        83       982        96
VIS    2025250     20200   21.0400  140.8000       9.8        75       997        93
VIS    2025250     20200   21.0400  140.7400      10.0        79       968        98
VIS    2025250     20200   21.0500  140.7400       9.9        79       964        98
VIS    2025250     20200   21.0500  140.7100       9.7        83       954        99
VIS    2025250     20200   21.0500  140.6900       9.4        83       964        97
VIS    2025250     20200   21.0400  140.6500       9.8        76       955        95
VIS    2025250     20200   21.0500  140.6400      10.0        75       955        94
VIS    2025250     20200   21.0400  140.6000       9.9        79       945        99
VIS    2025250     20200   21.0400  140.5900      10.0        82       945       100
VIS    2025250     20200   21.0300  140.5700       9.7        85       938        98
VIS    2025250     20200   21.0400  140.5300       9.7        82       933        93
VIS    2025250     20200   21.0300  140.5000      10.0        78       922        90
VIS    2025250     20200   21.0400  140.4800       9.7        80       922        92
VIS    2025250     20200   21.0400  140.4700       9.5        80       922        91
VIS    2025250     20200   21.0400  140.4200       9.6        81       931        92
VIS    2025250     20200   21.0700  147.7900       5.4        88       966        93
VIS    2025250     20200   21.0700  147.3100       4.8        71       962        93
VIS    2025250     20200   21.0700  146.5800       6.7        75       919        94
VIS    2025250     20200   21.0600  146.5600       6.3        76       909        94
VIS    2025250     20200   21.0600  146.5100       5.4        74       951        98
VIS    2025250     20200   21.0500  145.3800       9.4        81       983        91
VIS    2025250     20200   21.0500  145.3400       9.7        73       954        93
VIS    2025250     20200   21.0400  145.3400       9.5        72       954        94
VIS    2025250     20200   21.0400  145.3100       9.2        73       948        92
VIS    2025250     20200   21.0400  145.2900       8.9        77       958        90
VIS    2025250     20200   21.0600  145.2500       8.6        85       971        93
VIS    2025250     20200   21.0400  145.2400       8.3        86       968        92
VIS    2025250     20200   21.0400  145.1900       8.4        88       930        96
VIS    2025250     20200   21.0600  145.1800       8.6        86       930        97
VIS    2025250     20200   21.0400  145.1500       8.6        84       906        99
VIS    2025250     20200   21.0400  145.1400       8.5        85       905        98
VIS    2025250     20200   21.0400  145.1100       8.3        88       903        98
VIS    2025250     20200   21.0500  145.0700       9.2        85       903        98
VIS    2025250     20200   21.0400  145.0500       9.1        83       900        98
VIS    2025250     20200   21.0600  145.0200       9.5        80       899        97
VIS    2025250     20200   21.0400  145.0100       9.5        80       899        97
VIS    2025250     20200   21.0400  144.9700       9.7        78       900        97
VIS    2025250     20200   21.0500  144.9600       9.6        78       900        97
VIS    2025250     20200   21.0600  144.9300       9.3        76       900        95
VIS    2025250     20200   21.0400  144.8500       8.7        70       901        96
VIS    2025250     20200   21.0400  144.8400       8.6        73       901        95
VIS    2025250     20200   21.0400  144.8100       8.5        78       901        95
VIS    2025250     20200   21.0500  144.7900       8.3        83       901        96
VIS    2025250     20200   21.0400  144.7600       7.8        89       902        97
VIS    2025250     20200   21.0400  144.7300       7.7        87       903        98
VIS    2025250     20200   21.0400  144.7000       8.5        85       902        99
VIS    2025250     20200   21.0500  144.6900       8.8        84       901        99
VIS    2025250     20200   21.0500  144.6500       9.3        79       904        95
VIS    2025250     20200   21.0300  144.6400       9.5        76       904        94
VIS    2025250     20200   21.0300  144.6100       9.4        77       905        97
VIS    2025250     20200   21.0500  144.5900       9.1        81       905        99
VIS    2025250     20200   21.0500  144.5500       8.7        84       905        99
VIS    2025250     20200   21.0500  144.5400       8.8        82       905        99
VIS    2025250     20200   21.0400  144.5200       8.5        77       904        98
VIS    2025250     20200   21.0500  144.4900       8.4        70       904        93
VIS    2025250     20200   21.0500  144.4600       7.5        76       903        95
VIS    2025250     20200   21.0300  144.4400       7.1        74       902        93
VIS    2025250     20200   21.0300  144.4000       7.1        76       904        92
VIS    2025250     20200   21.0400  144.3800       7.5        78       905        93
VIS    2025250     20200   21.0400  144.3700       7.7        80       905        95
VIS    2025250     20200   21.0300  144.3400       8.1        83       909        99
VIS    2025250     20200   21.0400  144.3200       8.2        81       909        99
VIS    2025250     20200   21.0400  144.2900       8.2        79       909        99
VIS    2025250     20200   21.0300  144.2600       8.3        78       907        99
VIS    2025250     20200   21.0500  144.2300       8.3        76       905        98
VIS    2025250     20200   21.0400  144.2100       8.3        75       903        97
VIS    2025250     20200   21.0500  144.1200       8.1        77       906        95
VIS    2025250     20200   21.0400  144.0900       7.8        76       909        92
VIS    2025250     20200   21.0300  144.0700       8.2        78       916        95
VIS    2025250     20200   21.0300  144.0300       8.4        80       917        99
VIS    2025250     20200   21.0300  144.0200       8.3        82       921        98
VIS    2025250     20200   21.0400  143.9800       8.4        83       923        98
VIS    2025250     20200   21.0400  143.9700       8.3        80       923        97
VIS    2025250     20200   21.0400  143.9400       8.9        88       921        92
VIS    2025250     20200   21.0400  143.9000      10.4        97       928        93
VIS    2025250     20200   21.0500  143.8700      10.9        97       941        90
VIS    2025250     20200   21.0500  143.6200      10.3        81       962        95
VIS    2025250     20200   21.0500  143.6000      10.4        82       929        99
VIS    2025250     20200   21.0500  143.5900      10.4        83       922        99
VIS    2025250     20200   21.0400  143.5400       9.9        81       918        97
VIS    2025250     20200   21.0500  143.5400       9.9        81       918        97
VIS    2025250     20200   21.0300  143.4900      10.1        67       918        93
VIS    2025250     20200   21.0300  143.4700      10.1        68       918        93
VIS    2025250     20200   21.0300  143.4600      10.0        69       918        93
VIS    2025250     20200   21.0300  143.4400       9.4        75       918        96
VIS    2025250     20200   21.0400  143.4100       9.7        81       918        98
VIS    2025250     20200   21.0300  143.3800       9.8        82       919        99
VIS    2025250     20200   21.0400  143.3500       9.8        86       920        99
VIS    2025250     20200   21.0400  143.3300       9.7        90       923       100
VIS    2025250     20200   21.0200  143.3200      10.0        90       935        98
VIS    2025250     20200   21.0300  143.2900      10.1        89       934        99
VIS    2025250     20200   21.0400  143.2500       9.8        96       926        97
VIS    2025250     20200   21.0400  143.2400       9.7        96       926        97
VIS    2025250     20200   21.0200  143.0000       8.2        89       934        96
VIS    2025250     20200   21.0200  142.9800       8.5        83       921        98
VIS    2025250     20200   21.0300  142.9500       8.7        80       917        96
VIS    2025250     20200   21.0400  142.9300       9.0        80       917        97
VIS    2025250     20200   21.0300  142.9100       9.3        73       921        95
VIS    2025250     20200   21.0400  142.8900       9.2        74       924        97
VIS    2025250     20200   21.0400  142.8700       9.1        72       929        95
VIS    2025250     20200   21.0400  142.8500       8.5        69       929        90
VIS    2025250     20200   21.0400  142.8200       8.5        73       919        92
VIS    2025250     20200   21.0400  142.7800       9.2        80       914        96
VIS    2025250     20200   21.0400  142.7700       9.2        80       914        97
VIS    2025250     20200   21.0400  142.7400       8.9        78       919        96
VIS    2025250     20200   21.0400  142.7200       8.2        76       926        93
VIS    2025250     20200   21.0300  142.4400       9.6        87       982        95
VIS    2025250     20200   21.0300  142.4400       9.7        88       984        95
VIS    2025250     20200   21.0200  142.3900       9.7        81       897        92
VIS    2025250     20200   21.0300  142.3800       9.7        81       908        94
VIS    2025250     20200   21.0300  142.3600       9.5        82       897        93
VIS    2025250     20200   21.0200  142.3200      10.7        84       885        91
VIS    2025250     20200   21.0200  142.3100      10.6        82       885        91
VIS    2025250     20200   21.0300  142.2900       9.7        81       885        91
VIS    2025250     20200   21.0200  142.2500       9.7        83       913        95
VIS    2025250     20200   21.0300  142.2200       9.9        81       918        95
VIS    2025250     20200   21.0300  142.2100       9.8        77       918        93
VIS    2025250     20200   21.0300  141.9000      10.1        83       928        98
VIS    2025250     20200   21.0200  141.7500      10.1        77       973        96
VIS    2025250     20200   21.0300  141.7400      10.2        77       966        97
VIS    2025250     20200   21.0200  141.7000       9.4        79       934        96
VIS    2025250     20200   21.0100  141.6900       9.5        79       921        94
VIS    2025250     20200   21.0300  141.5700      10.4        84       881        90
VIS    2025250     20200   21.0300  141.5000       9.8        77       966        95
VIS    2025250     20200   21.0300  141.4900       9.6        79       939        96
VIS    2025250     20200   21.0300  141.4100       9.4        87       964        95
VIS    2025250     20200   21.0300  141.4000       9.7        88       964        95
VIS    2025250     20200   21.0200  141.2600       9.8        81       968        96
VIS    2025250     20200   21.0200  141.2500       9.9        81       969        97
VIS    2025250     20200   21.0100  140.9300      10.1        78       990        90
VIS    2025250     20200   21.0200  140.8900       9.8        83       993        92
VIS    2025250     20200   21.0300  140.8700       9.8        82       993        93
VIS    2025250     20200   21.0300  140.8400      10.3        78       993        96
VIS    2025250     20200   21.0100  140.8300      10.1        79       987        95
VIS    2025250     20200   21.0300  140.8000       9.7        77       997        96
VIS    2025250     20200   21.0200  140.7700       9.9        79       986        96
VIS    2025250     20200   21.0300  140.7500      10.0        78       981        98
VIS    2025250     20200   21.0300  140.7300      10.2        79       968        99
VIS    2025250     20200   21.0100  140.6900       9.6        82       968        97
VIS    2025250     20200   21.0300  140.6700       9.7        79       968        97
VIS    2025250     20200   21.0300  140.6500      10.0        77       955        97
VIS    2025250     20200   21.0100  140.6300      10.1        77       945        98
VIS    2025250     20200   21.0200  140.6100      10.0        79       944        99
VIS    2025250     20200   21.0100  140.5800       9.8        83       943        96
VIS    2025250     20200   21.0300  140.5600       9.7        85       938        96
VIS    2025250     20200   21.0100  140.5300       9.7        80       933        93
VIS    2025250     20200   21.0200  140.5100       9.9        78       925        92
VIS    2025250     20200   21.0100  140.4700       9.9        77       937        93
VIS    2025250     20200   21.0200  140.4600       9.8        78       933        93
VIS    2025250     20200   21.0300  140.4300       9.7        81       935        95
VIS    2025250     20200   21.0100  140.4100       9.4        86       951        98
VIS    2025250     20200   21.0600  147.7900       5.6        90       966        91
VIS    2025250     20200   21.0600  147.7700       5.5        85       966        97
VIS    2025250     20200   21.0300  146.6200       7.3        69       959        93
VIS    2025250     20200   21.0300  146.6200       7.3        70       959        94
VIS    2025250     20200   21.0500  146.5900       6.7        79       909        93
VIS    2025250     20200   21.0500  146.5600       6.2        77       912        93
VIS    2025250     20200   21.0200  145.4000       9.3        82       974        91
VIS    2025250     20200   21.0300  145.3600       9.6        76       980        93
VIS    2025250     20200   21.0300  145.3600       9.6        74       978        92
VIS    2025250     20200   21.0400  145.3200       9.0        72       934        93
VIS    2025250     20200   21.0300  145.3100       8.7        71       928        93
VIS    2025250     20200   21.0400  145.2700       8.8        79       959        90
VIS    2025250     20200   21.0200  145.2600       8.6        79       948        93
VIS    2025250     20200   21.0200  145.2200       7.8        85       954        93
VIS    2025250     20200   21.0300  145.1900       8.3        87       923        97
VIS    2025250     20200   21.0200  145.1800       8.4        85       910        99
VIS    2025250     20200   21.0300  145.1500       8.7        83       906        99
VIS    2025250     20200   21.0200  145.1300       8.6        86       901        99
VIS    2025250     20200   21.0300  145.1100       8.4        89       902        98
VIS    2025250     20200   21.0100  145.0700       8.6        84       900        98
VIS    2025250     20200   21.0200  145.0600       8.9        83       900        98
VIS    2025250     20200   21.0300  145.0200       9.3        80       900        98
VIS    2025250     20200   21.0300  145.0000       9.5        80       899        97
VIS    2025250     20200   21.0100  144.9700      10.2        78       899        95
VIS    2025250     20200   21.0300  144.9400       9.6        75       900        96
VIS    2025250     20200   21.0300  144.9300       9.6        74       900        95
VIS    2025250     20200   21.0300  144.9000       9.4        72       900        94
VIS    2025250     20200   21.0200  144.8700       9.1        71       901        96
VIS    2025250     20200   21.0300  144.8500       8.8        71       901        97
VIS    2025250     20200   21.0300  144.8400       8.6        73       901        97
VIS    2025250     20200   21.0200  144.8000       8.4        77       902        90
VIS    2025250     20200   21.0300  144.7900       8.5        81       901        91
VIS    2025250     20200   21.0100  144.7500       7.7        81       903        95
VIS    2025250     20200   21.0300  144.7200       7.8        84       903        98
VIS    2025250     20200   21.0300  144.7000       8.5        81       903        99
VIS    2025250     20200   21.0300  144.6800       8.8        80       903        99
VIS    2025250     20200   21.0100  144.6500       9.5        76       904        95
VIS    2025250     20200   21.0100  144.6200       9.7        73       905        95
VIS    2025250     20200   21.0300  144.6100       9.4        76       905        96
VIS    2025250     20200   21.0300  144.5900       9.1        78       906        98
VIS    2025250     20200   21.0100  144.5400       7.9        81       906        98
VIS    2025250     20200   21.0100  144.5300       7.9        81       906        98
VIS    2025250     20200   21.0200  144.5000       7.6        75       905        96
VIS    2025250     20200   21.0300  144.4800       7.5        74       904        95
VIS    2025250     20200   21.0100  144.4600       7.3        73       905        94
VIS    2025250     20200   21.0100  144.4400       7.3        73       907        93
VIS    2025250     20200   21.0100  144.4100       7.3        75       909        92
VIS    2025250     20200   21.0200  144.3800       7.5        79       909        95
VIS    2025250     20200   21.0300  144.3700       7.8        80       909        97
VIS    2025250     20200   21.0100  144.3400       7.9        84       915        99
VIS    2025250     20200   21.0200  144.3000       8.0        80       910        98
VIS    2025250     20200   21.0100  144.2800       8.1        79       910        98
VIS    2025250     20200   21.0100  144.2600       8.2        80       907        97
VIS    2025250     20200   21.0200  144.2300       8.3        79       904        98
VIS    2025250     20200   21.0200  144.2200       8.4        78       903        97
VIS    2025250     20200   21.0100  144.1800       8.5        70       904        93
VIS    2025250     20200   21.0200  144.1200       8.4        78       906        94
VIS    2025250     20200   21.0100  144.1100       8.3        79       908        97
VIS    2025250     20200   21.0300  144.0800       7.9        76       911        93
VIS    2025250     20200   21.0200  144.0500       8.3        78       917        98
VIS    2025250     20200   21.0100  144.0500       8.2        78       917        98
VIS    2025250     20200   21.0100  144.0000       7.9        87       923        91
VIS    2025250     20200   21.0100  143.9700       8.8        91       923        91
VIS    2025250     20200   21.0200  143.9300       9.6        92       925        95
VIS    2025250     20200   21.0200  143.9200       9.6        92       932        96
VIS    2025250     20200   21.0000  143.8800       8.7        79       948        94
VIS    2025250     20200   21.0000  143.8500       8.3        78       948        95
VIS    2025250     20200   21.0200  143.6300      10.3        78       962        96
VIS    2025250     20200   21.0000  143.6200      10.3        81       960        98
VIS    2025250     20200   21.0000  143.6000      10.3        84       926        99
VIS    2025250     20200   21.0100  143.5500      10.0        78       919        94
VIS    2025250     20200   21.0000  143.5500      10.1        77       919        94
VIS    2025250     20200   21.0200  143.5100       9.9        69       918        94
VIS    2025250     20200   21.0200  143.4900      10.0        73       918        94
VIS    2025250     20200   21.0200  143.4600       9.7        76       918        94
VIS    2025250     20200   21.0100  143.4500       9.7        84       919        98
VIS    2025250     20200   21.0000  143.4100       9.9        85       920        97
VIS    2025250     20200   21.0100  143.3900       9.9        84       920        98
VIS    2025250     20200   21.0100  143.3600       9.7        84       925       100
VIS    2025250     20200   21.0100  143.3500       9.8        86       928        99
VIS    2025250     20200   21.0200  143.2800      10.3        91       932        98
VIS    2025250     20200   21.0000  143.0600       8.0        81       966        93
VIS    2025250     20200   21.0000  143.0500       7.8        81       966        93
VIS    2025250     20200   21.0000  143.0100       8.4        86       934        98
VIS    2025250     20200   21.0000  143.0000       8.4        86       921        99
VIS    2025250     20200   21.0200  142.9700       8.7        81       917        96
VIS    2025250     20200   21.0000  142.9400       9.3        74       912        94
VIS    2025250     20200   21.0100  142.9200       9.4        73       915        94
VIS    2025250     20200   21.0000  142.9000       9.2        73       921        95
VIS    2025250     20200   21.0000  142.8800       9.0        71       921        94
VIS    2025250     20200   21.0100  142.8600       8.9        68       919        91
VIS    2025250     20200   21.0000  142.8100       8.7        79       907        94
VIS    2025250     20200   21.0000  142.8000       8.8        80       907        95
VIS    2025250     20200   21.0100  142.7800       9.0        81       907        95
VIS    2025250     20200   21.0200  142.7500       8.8        80       905        94
VIS    2025250     20200   21.0200  142.7300       7.7        77       905        93
VIS    2025250     20200   21.0100  142.4700       9.3        88       982        93
VIS    2025250     20200   20.9900  142.4300       9.5        78       897        91
VIS    2025250     20200   20.9900  142.4100       9.5        79       881        90
VIS    2025250     20200   21.0000  142.3700      10.0        81       881        91
VIS    2025250     20200   21.0000  142.3500      10.5        81       881        90
VIS    2025250     20200   21.0000  142.3300      10.7        82       885        90
VIS    2025250     20200   21.0000  142.3200      10.6        81       885        91
VIS    2025250     20200   20.9900  142.2800       9.7        81       885        91
VIS    2025250     20200   20.9900  141.7200       9.8        87       962        92
VIS    2025250     20200   20.9900  141.7100       9.7        85       962        94
VIS    2025250     20200   21.0100  141.5600      10.5        83       921        95
VIS    2025250     20200   20.9900  141.5300      10.2        83       943        95
VIS    2025250     20200   20.9900  141.5200      10.0        82       943        96
VIS    2025250     20200   20.9900  141.4800       9.4        84       956        95
VIS    2025250     20200   21.0000  141.4700       9.2        83       948        93
VIS    2025250     20200   21.0100  141.4500       9.1        85       964        90
VIS    2025250     20200   21.0000  141.4100       9.8        84       889        91
VIS    2025250     20200   21.0000  141.4000       9.9        83       881        90
VIS    2025250     20200   21.0000  141.2800       9.7        83       932        97
VIS    2025250     20200   20.9900  141.2400      10.7        86       981        97
VIS    2025250     20200   20.9900  141.2300      11.0        84       981        97
VIS    2025250     20200   20.9900  141.2000      11.0        79       981        93
VIS    2025250     20200   20.9900  140.9400       9.9        80       990        97
VIS    2025250     20200   20.9900  140.9100      10.3        78       980        96
VIS    2025250     20200   20.9900  140.9100      10.3        78       980        95
VIS    2025250     20200   21.0000  140.8700       9.9        80       976        97
VIS    2025250     20200   21.0000  140.8600       9.9        80       976        97
VIS    2025250     20200   20.9900  140.8200      10.3        81       973        96
VIS    2025250     20200   21.0000  140.7900      10.2        80       981        94
VIS    2025250     20200   20.9800  140.7700      10.2        82       969        98
VIS    2025250     20200   20.9800  140.7600      10.2        82       969        98
VIS    2025250     20200   20.9900  140.7200      10.3        82       967        98
VIS    2025250     20200   20.9800  140.6900      10.1        83       967        95
VIS    2025250     20200   20.9800  140.6800      10.1        81       954        94
VIS    2025250     20200   20.9900  140.6500      10.2        79       947        99
VIS    2025250     20200   20.9900  140.6300       9.9        81       945        99
VIS    2025250     20200   20.9800  140.6000       9.9        83       947        96
VIS    2025250     20200   20.9800  140.5900      10.0        83       950        95
VIS    2025250     20200   20.9900  140.5600       9.8        82       937        95
VIS    2025250     20200   21.0000  140.5300       9.6        81       935        95
VIS    2025250     20200   21.0000  140.4900       9.7        78       937        95
VIS    2025250     20200   20.9800  140.4500       9.8        83       955        97
VIS    2025250     20200   21.0000  140.4100       9.4        86       952        97
VIS    2025250     20200   21.0300  147.7800       6.3        88       966        95
VIS    2025250     20200   21.0400  147.7600       6.2        88       966        94
VIS    2025250     20200   21.0100  147.4300       6.3        82       988        96
VIS    2025250     20200   21.0200  146.6100       7.1        71       938        95
VIS    2025250     20200   20.9900  145.3700       9.7        71       960        90
VIS    2025250     20200   21.0100  145.3400       9.3        70       955        93
VIS    2025250     20200   20.9900  145.3000       8.7        72       918        94
VIS    2025250     20200   21.0100  145.2700       8.8        77       922        94
VIS    2025250     20200   21.0000  145.2600       8.9        76       912        94
VIS    2025250     20200   20.9900  145.2300       8.5        78       917        99
VIS    2025250     20200   20.9900  145.2000       7.8        82       908       100
VIS    2025250     20200   21.0100  145.1800       8.2        85       910        99
VIS    2025250     20200   21.0100  145.1600       8.6        82       905        99
VIS    2025250     20200   21.0100  145.1200       8.8        86       898        99
VIS    2025250     20200   21.0100  145.1100       8.7        87       901        98
VIS    2025250     20200   21.0000  145.0900       8.8        85       902        98
VIS    2025250     20200   21.0000  145.0400       8.9        81       900        98
VIS    2025250     20200   21.0100  145.0400       9.0        81       900        98
VIS    2025250     20200   21.0100  145.0000       9.7        81       899        97
VIS    2025250     20200   20.9900  144.9700       9.9        78       899        96
VIS    2025250     20200   20.9900  144.9600      10.3        75       899        94
VIS    2025250     20200   20.9900  144.9300      10.2        72       900        94
VIS    2025250     20200   21.0100  144.9000       9.2        72       901        96
VIS    2025250     20200   21.0000  144.8900       9.1        72       901        96
VIS    2025250     20200   20.9900  144.8600       8.9        71       901        96
VIS    2025250     20200   21.0100  144.8400       8.6        73       902        96
VIS    2025250     20200   20.9900  144.8000       8.6        77       903        96
VIS    2025250     20200   20.9900  144.7600       7.8        77       903        93
VIS    2025250     20200   21.0000  144.7400       7.5        82       904        96
VIS    2025250     20200   20.9800  144.7100       7.8        83       905        97
VIS    2025250     20200   20.9900  144.6900       8.0        81       904        99
VIS    2025250     20200   20.9900  144.6500       9.1        77       905        97
VIS    2025250     20200   20.9900  144.6200       9.7        75       905        96
VIS    2025250     20200   20.9900  144.6200       9.8        74       906        96
VIS    2025250     20200   20.9900  144.5700       8.6        74       908        96
VIS    2025250     20200   20.9900  144.5600       8.3        74       908        96
VIS    2025250     20200   21.0000  144.5300       7.8        80       906        97
VIS    2025250     20200   21.0000  144.5100       7.7        77       906        96
VIS    2025250     20200   20.9900  144.4800       7.6        75       908        96
VIS    2025250     20200   20.9900  144.4600       7.5        75       908        95
VIS    2025250     20200   20.9900  144.4300       7.6        75       911        94
VIS    2025250     20200   21.0000  144.4100       7.5        77       911        95
VIS    2025250     20200   20.9800  144.3900       7.9        81       913        98
VIS    2025250     20200   21.0000  144.3700       7.8        84       914        99
VIS    2025250     20200   20.9800  144.3300       7.9        80       915        98
VIS    2025250     20200   20.9800  144.3200       7.9        80       915        98
VIS    2025250     20200   20.9800  144.2900       8.1        77       910        97
VIS    2025250     20200   20.9800  144.2700       8.1        80       907        92
VIS    2025250     20200   20.9900  144.2400       8.2        83       903        99
VIS    2025250     20200   20.9800  144.2200       8.4        81       903        99
VIS    2025250     20200   20.9800  144.2000       8.2        78       904        97
VIS    2025250     20200   21.0000  144.1500       8.6        74       908        96
VIS    2025250     20200   21.0000  144.1500       8.6        76       908        97
VIS    2025250     20200   20.9800  144.1100       8.4        86       916        99
VIS    2025250     20200   20.9800  144.0800       8.3        83       917        97
VIS    2025250     20200   20.9800  144.0600       8.4        82       917        98
VIS    2025250     20200   20.9800  144.0500       8.3        81       918        99
VIS    2025250     20200   20.9800  144.0000       8.0        81       921        93
VIS    2025250     20200   20.9800  143.9800       8.2        82       927        90
VIS    2025250     20200   20.9800  143.9700       8.3        83       926        90
VIS    2025250     20200   21.0000  143.9500       9.5        91       925        95
VIS    2025250     20200   20.9900  143.9200       9.0        81       941        96
VIS    2025250     20200   20.9800  143.9000       8.7        75       941        93
VIS    2025250     20200   20.9900  143.8700       8.5        78       948        91
VIS    2025250     20200   20.9800  143.8500       8.8        79       932        98
VIS    2025250     20200   20.9800  143.6300      10.1        82       960        94
VIS    2025250     20200   20.9800  143.6200      10.2        82       959        95
VIS    2025250     20200   20.9800  143.5800      10.4        82       925        97
VIS    2025250     20200   20.9900  143.5700      10.3        82       921        96
VIS    2025250     20200   20.9900  143.5500      10.3        78       919        94
VIS    2025250     20200   20.9800  143.5100      10.5        84       919        97
VIS    2025250     20200   20.9900  143.4800      10.0        85       919        95
VIS    2025250     20200   21.0000  143.4700       9.9        85       919        96
VIS    2025250     20200   21.0000  143.4500       9.7        85       920        98
VIS    2025250     20200   20.9900  143.4200       9.9        85       920        98
VIS    2025250     20200   20.9700  143.4000      10.1        90       922        96
VIS    2025250     20200   20.9900  143.0600       8.0        81       966        93
VIS    2025250     20200   20.9900  143.0400       8.2        84       954        95
VIS    2025250     20200   20.9900  143.0100       8.5        84       934        98
VIS    2025250     20200   20.9900  143.0000       8.6        84       921        98
VIS    2025250     20200   20.9900  142.9800       8.9        80       914        96
VIS    2025250     20200   20.9900  142.9400       9.4        73       912        93
VIS    2025250     20200   20.9900  142.9200       9.4        73       914        94
VIS    2025250     20200   20.9800  142.9000       9.2        74       914        95
VIS    2025250     20200   20.9800  142.8600       9.0        75       909        94
VIS    2025250     20200   20.9700  142.8500       9.0        77       904        94
VIS    2025250     20200   20.9900  142.8200       8.6        77       907        94
VIS    2025250     20200   20.9900  142.8000       8.7        78       904        94
VIS    2025250     20200   20.9900  142.7700       8.9        76       885        92
VIS    2025250     20200   20.9700  142.5900       9.8        81       982        92
VIS    2025250     20200   20.9700  142.5400      10.4        85       976        95
VIS    2025250     20200   20.9700  142.5300      11.1        85       976        95
VIS    2025250     20200   20.9700  142.4800      10.2        81       939        97
VIS    2025250     20200   20.9700  142.4600      10.2        77       916        92
VIS    2025250     20200   20.9900  142.4300       9.6        78       881        90
VIS    2025250     20200   20.9900  142.3300      10.6        82       877        90
VIS    2025250     20200   20.9900  142.3100      10.3        80       864        90
VIS    2025250     20200   20.9600  141.7400      10.2        88       962        92
VIS    2025250     20200   20.9600  141.7300      10.2        86       962        95
VIS    2025250     20200   20.9600  141.6900      10.4        77       919        90
VIS    2025250     20200   20.9700  141.5800       9.3        83       893        90
VIS    2025250     20200   20.9700  141.5500       9.9        86       919        95
VIS    2025250     20200   20.9600  141.5200      10.0        81       954        95
VIS    2025250     20200   20.9800  141.5000       9.6        82       956        97
VIS    2025250     20200   20.9600  141.4800      10.0        80       907        91
VIS    2025250     20200   20.9800  141.2800       9.6        84       966        95
VIS    2025250     20200   20.9700  141.2700       9.9        86       966        96
VIS    2025250     20200   20.9700  141.2400      10.6        87       968        96
VIS    2025250     20200   20.9600  141.2000      10.9        78       966        97
VIS    2025250     20200   20.9700  141.1900      10.7        77       968        95
VIS    2025250     20200   20.9600  140.9900       8.8        82       970        93
VIS    2025250     20200   20.9600  140.9600       9.5        83       970        97
VIS    2025250     20200   20.9800  140.9400       9.8        82       990        97
VIS    2025250     20200   20.9800  140.9100      10.2        79       980        96
VIS    2025250     20200   20.9700  140.8800      10.2        81       976        97
VIS    2025250     20200   20.9800  140.8800      10.1        81       976        97
VIS    2025250     20200   20.9600  140.8400      10.3        79       948        99
VIS    2025250     20200   20.9600  140.8300      10.2        80       948        98
VIS    2025250     20200   20.9600  140.7900      10.1        82       947        96
VIS    2025250     20200   20.9800  140.7700      10.2        82       961        98
VIS    2025250     20200   20.9700  140.7400      10.4        84       948       100
VIS    2025250     20200   20.9600  140.7300      10.4        84       944       100
VIS    2025250     20200   20.9600  140.6900      10.4        84       947        98
VIS    2025250     20200   20.9700  140.6600      10.4        80       945        99
VIS    2025250     20200   20.9700  140.6500      10.2        82       940        99
VIS    2025250     20200   20.9800  140.6300       9.9        81       943        99
VIS    2025250     20200   20.9800  140.5900       9.9        84       950        95
VIS    2025250     20200   20.9800  140.5800      10.1        84       952        95
VIS    2025250     20200   20.9700  140.5600      10.0        85       947        99
VIS    2025250     20200   20.9600  140.5400       9.8        83       941        99
VIS    2025250     20200   20.9700  140.5100       9.3        82       943        98
VIS    2025250     20200   20.9700  140.4800       9.4        80       948        96
VIS    2025250     20200   20.9700  140.4500       9.6        83       962        96
VIS    2025250     20200   20.9700  140.4400       9.7        86       968        96
VIS    2025250     20200   20.9600  140.4100       9.6        90       968        96
VIS    2025250     20200   21.0100  147.7600       6.1        78       972        96
VIS    2025250     20200   21.0000  147.7300       5.7        77       973        99
VIS    2025250     20200   21.0000  147.7300       5.6        76       983        99
VIS    2025250     20200   20.9900  147.6900       6.3        80       989        97
VIS    2025250     20200   21.0000  147.4400       6.3        83       987        96
VIS    2025250     20200   21.0000  147.4100       5.9        76       987        92
VIS    2025250     20200   20.9900  147.3800       5.7        78       978        97
VIS    2025250     20200   20.9800  146.6500       7.8        67       958        93
VIS    2025250     20200   20.9800  146.6400       7.7        68       938        94
VIS    2025250     20200   20.9900  146.6100       6.3        67       924        90
VIS    2025250     20200   20.9900  145.4300       9.1        79       976        94
VIS    2025250     20200   20.9800  145.4200       9.1        78       976        94
VIS    2025250     20200   20.9900  145.3900       9.3        77       976        94
VIS    2025250     20200   20.9700  145.3600      10.2        70       958        92
VIS    2025250     20200   20.9800  145.3300       9.7        71       934        91
VIS    2025250     20200   20.9700  145.3100       9.7        72       914        91
VIS    2025250     20200   20.9700  145.3000       9.3        72       912        92
VIS    2025250     20200   20.9800  145.2700       9.0        73       908        95
VIS    2025250     20200   20.9800  145.2300       8.6        78       917        99
VIS    2025250     20200   20.9800  145.2200       8.4        79       908        99
VIS    2025250     20200   20.9800  145.2000       7.8        82       908       100
VIS    2025250     20200   20.9800  145.1600       8.4        82       900       100
VIS    2025250     20200   20.9800  145.1400       8.8        83       899        99
VIS    2025250     20200   20.9700  145.1200       8.9        84       898        98
VIS    2025250     20200   20.9800  145.1000       9.0        83       902        98
VIS    2025250     20200   20.9700  145.0600       9.1        78       901        97
VIS    2025250     20200   20.9700  145.0300       9.1        78       900        98
VIS    2025250     20200   20.9700  145.0000       9.2        79       899        98
VIS    2025250     20200   20.9700  144.9800       9.4        78       899        97
VIS    2025250     20200   20.9700  144.9700       9.6        77       899        97
VIS    2025250     20200   20.9800  144.9300      10.1        72       901        94
VIS    2025250     20200   20.9700  144.9200       9.8        72       901        95
VIS    2025250     20200   20.9800  144.8900       9.0        71       901        96
VIS    2025250     20200   20.9800  144.8700       8.8        69       901        96
VIS    2025250     20200   20.9700  144.8500       9.0        70       901        95
VIS    2025250     20200   20.9800  144.8100       8.9        77       902        97
VIS    2025250     20200   20.9700  144.7900       8.7        77       902        98
VIS    2025250     20200   20.9700  144.7700       8.5        75       903        90
VIS    2025250     20200   20.9800  144.7500       8.0        73       904        93
VIS    2025250     20200   20.9700  144.7200       7.9        80       905        97
VIS    2025250     20200   20.9800  144.7000       7.9        82       905        98
VIS    2025250     20200   20.9600  144.6600       8.4        80       905        99
VIS    2025250     20200   20.9600  144.6400       9.2        78       905        97
VIS    2025250     20200   20.9800  144.6100       9.8        74       908        96
VIS    2025250     20200   20.9800  144.6000       9.6        74       909        97
VIS    2025250     20200   20.9800  144.5800       8.9        73       909        97
VIS    2025250     20200   20.9600  144.5400       8.2        72       916        95
VIS    2025250     20200   20.9600  144.5300       8.1        73       920        96
VIS    2025250     20200   20.9600  144.4900       8.0        75       917        98
VIS    2025250     20200   20.9800  144.4800       7.8        75       912        97
VIS    2025250     20200   20.9600  144.4300       8.4        76       911        96
VIS    2025250     20200   20.9600  144.4300       8.5        77       911        97
VIS    2025250     20200   20.9700  144.4000       8.2        80       913        99
VIS    2025250     20200   20.9700  144.3600       8.0        80       915        99
VIS    2025250     20200   20.9600  144.3300       7.9        79       915        97
VIS    2025250     20200   20.9700  144.3200       8.0        78       915        97
VIS    2025250     20200   20.9700  144.3000       8.2        77       911        97
VIS    2025250     20200   20.9600  144.2700       8.2        80       906        96
VIS    2025250     20200   20.9800  144.2500       8.1        81       904        94
VIS    2025250     20200   20.9700  144.2100       8.2        80       903        99
VIS    2025250     20200   20.9700  144.2100       8.1        80       904        98
VIS    2025250     20200   20.9800  144.1800       8.1        78       906        96
VIS    2025250     20200   20.9600  144.1500       8.1        84       913       100
VIS    2025250     20200   20.9500  144.1300       8.0        86       917        99
VIS    2025250     20200   20.9600  144.0900       8.3        84       916        97
VIS    2025250     20200   20.9600  144.0700       8.5        82       917        98
VIS    2025250     20200   20.9700  144.0600       8.5        82       918        99
VIS    2025250     20200   20.9700  144.0100       8.5        82       921        97
VIS    2025250     20200   20.9700  144.0100       8.4        81       922        96
VIS    2025250     20200   20.9500  143.9800       8.2        77       930        92
VIS    2025250     20200   20.9500  143.9500       8.1        75       937        95
VIS    2025250     20200   20.9500  143.9300       8.1        76       941        94
VIS    2025250     20200   20.9600  143.9000       8.6        77       951        94
VIS    2025250     20200   20.9500  143.8600       9.0        80       932        99
VIS    2025250     20200   20.9500  143.8600       9.0        80       932        99
VIS    2025250     20200   20.9600  143.6400      10.3        75       990        91
VIS    2025250     20200   20.9600  143.6100      10.5        76       959        97
VIS    2025250     20200   20.9600  143.5900      10.8        75       928        96
VIS    2025250     20200   20.9700  143.5800      10.5        81       925        97
VIS    2025250     20200   20.9600  143.5500      10.5        81       921        98
VIS    2025250     20200   20.9700  143.5300      10.5        81       919        96
VIS    2025250     20200   20.9700  143.5100      10.4        85       919        97
VIS    2025250     20200   20.9500  143.4700       9.9        85       922        99
VIS    2025250     20200   20.9600  143.4600       9.8        86       922        99
VIS    2025250     20200   20.9600  143.4200      10.2        88       921        97
VIS    2025250     20200   20.9600  143.0800       9.2        87       971        91
VIS    2025250     20200   20.9500  143.0400       9.5        84       939        96
VIS    2025250     20200   20.9600  143.0300       9.3        82       939        94
VIS    2025250     20200   20.9500  143.0100       9.4        80       929        98
VIS    2025250     20200   20.9600  142.9900       9.5        78       914        96
VIS    2025250     20200   20.9500  142.9400       9.5        74       912        92
VIS    2025250     20200   20.9700  142.9200       9.4        74       912        94
VIS    2025250     20200   20.9500  142.9100       9.4        72       909        93
VIS    2025250     20200   20.9500  142.8800       9.4        75       899        91
VIS    2025250     20200   20.9600  142.8500       9.1        77       887        92
VIS    2025250     20200   20.9600  142.8400       9.0        77       887        92
VIS    2025250     20200   20.9500  142.8100       8.4        75       875        91
VIS    2025250     20200   20.9500  142.6100      10.0        80       982        96
VIS    2025250     20200   20.9500  142.5900       9.9        79       975        95
VIS    2025250     20200   20.9500  142.5500      10.1        81       974        98
VIS    2025250     20200   20.9600  142.5300      11.0        86       974        96
VIS    2025250     20200   20.9500  142.5000      11.1        88       939        99
VIS    2025250     20200   20.9600  142.4900      10.9        87       939        99
VIS    2025250     20200   20.9400  141.7500       9.8        82       962        94
VIS    2025250     20200   20.9400  141.7400       9.9        81       962        96
VIS    2025250     20200   20.9400  141.5600       9.7        91       919        95
VIS    2025250     20200   20.9400  141.5400      10.0        90       935        94
VIS    2025250     20200   20.9400  141.5300      10.1        85       954        92
VIS    2025250     20200   20.9500  141.3100       9.1        81       919        90
VIS    2025250     20200   20.9500  141.3000       9.1        82       966        92
VIS    2025250     20200   20.9400  141.2700       9.7        87       953        96
VIS    2025250     20200   20.9400  141.2500       9.9        88       945        97
VIS    2025250     20200   20.9400  141.2200      10.3        82       944        98
VIS    2025250     20200   20.9600  141.1900      10.6        76       965        97
VIS    2025250     20200   20.9600  141.1800      10.9        75       965        98
VIS    2025250     20200   20.9600  141.1400      11.7        74       977        99
VIS    2025250     20200   20.9400  141.0200       9.7        77       966        97
VIS    2025250     20200   20.9500  141.0100       9.5        80       966        97
VIS    2025250     20200   20.9600  140.9700       9.3        85       964        96
VIS    2025250     20200   20.9400  140.9600       9.7        84       962        98
VIS    2025250     20200   20.9600  140.9300      10.1        80       970        98
VIS    2025250     20200   20.9500  140.9000      10.3        80       962        96
VIS    2025250     20200   20.9400  140.8700      10.4        80       936        97
VIS    2025250     20200   20.9400  140.8400      10.4        78       936        97
VIS    2025250     20200   20.9500  140.8200      10.2        81       947        98
VIS    2025250     20200   20.9400  140.8200      10.1        81       942        98
VIS    2025250     20200   20.9300  140.7900       9.9        82       927        94
VIS    2025250     20200   20.9400  140.7600      10.0        80       927        94
VIS    2025250     20200   20.9400  140.7400      10.1        83       933        97
VIS    2025250     20200   20.9300  140.7000      10.1        85       925        96
VIS    2025250     20200   20.9500  140.6900      10.4        84       944        98
VIS    2025250     20200   20.9300  140.6700      10.0        84       931        97
VIS    2025250     20200   20.9500  140.6200       9.7        85       938        97
VIS    2025250     20200   20.9400  140.6000       9.6        86       937        95
VIS    2025250     20200   20.9500  140.5800      10.1        89       952        95
VIS    2025250     20200   20.9400  140.5500      10.1        87       938        98
VIS    2025250     20200   20.9400  140.5500      10.1        87       938        99
VIS    2025250     20200   20.9400  140.5200       9.8        85       941        98
VIS    2025250     20200   20.9500  140.5000       9.4        84       948        97
VIS    2025250     20200   20.9500  140.4600       9.6        83       965        95
VIS    2025250     20200   20.9400  140.4400       9.8        88       965        96
VIS    2025250     20200   20.9500  140.4200       9.6        89       968        95
VIS    2025250     20200   20.9600  146.6300       7.4        71       946        95
VIS    2025250     20200   20.9700  146.6100       6.1        67       923        90
VIS    2025250     20200   20.9500  145.4200       9.2        75       985        92
VIS    2025250     20200   20.9500  145.4000       9.7        73       971        94
VIS    2025250     20200   20.9500  145.3800      10.1        72       971        92
VIS    2025250     20200   20.9600  145.3400      10.3        71       944        90
VIS    2025250     20200   20.9600  145.3300      10.3        71       936        90
VIS    2025250     20200   20.9500  145.3000       9.8        71       914        91
VIS    2025250     20200   20.9400  145.2800       9.4        70       905        93
VIS    2025250     20200   20.9400  145.2500       9.0        70       899        93
VIS    2025250     20200   20.9600  145.2300       9.0        75       902        97
VIS    2025250     20200   20.9400  145.2000       8.8        77       901        93
VIS    2025250     20200   20.9400  145.1800       8.7        77       901        95
VIS    2025250     20200   20.9400  145.1400       8.2        79       899        95
VIS    2025250     20200   20.9400  145.1200       8.2        84       898        96
VIS    2025250     20200   20.9600  145.1100       8.7        82       899        98
VIS    2025250     20200   20.9500  145.0800       9.1        81       902        98
VIS    2025250     20200   20.9600  145.0400       9.1        79       900        98
VIS    2025250     20200   20.9600  145.0400       9.2        79       900        98
VIS    2025250     20200   20.9500  145.0000       9.0        78       898        98
VIS    2025250     20200   20.9600  144.9800       9.2        77       899        98
VIS    2025250     20200   20.9400  144.9500       9.1        76       899        97
VIS    2025250     20200   20.9400  144.9200       9.0        76       898        97
VIS    2025250     20200   20.9600  144.9000       9.3        72       900        96
VIS    2025250     20200   20.9600  144.8700       8.7        69       901        96
VIS    2025250     20200   20.9500  144.8600       8.9        72       900        96
VIS    2025250     20200   20.9600  144.8200       9.3        76       900        94
VIS    2025250     20200   20.9600  144.8000       9.3        77       902        96
VIS    2025250     20200   20.9500  144.7900       9.1        76       902        98
VIS    2025250     20200   20.9300  144.7500       8.8        79       903        96
VIS    2025250     20200   20.9500  144.7400       8.5        82       904       100
VIS    2025250     20200   20.9300  144.7100       8.0        81       905        99
VIS    2025250     20200   20.9500  144.6800       8.1        80       905        99
VIS    2025250     20200   20.9500  144.6500       8.9        79       905        98
VIS    2025250     20200   20.9400  144.6400       9.0        79       905        97
VIS    2025250     20200   20.9300  144.6100       9.3        78       907        97
VIS    2025250     20200   20.9500  144.5700       8.9        74       917        98
VIS    2025250     20200   20.9400  144.5500       8.4        74       920        98
VIS    2025250     20200   20.9400  144.5400       8.3        73       921        97
VIS    2025250     20200   20.9400  144.5100       8.3        75       920        99
VIS    2025250     20200   20.9500  144.4800       8.1        76       917        98
VIS    2025250     20200   20.9400  144.4500       8.7        75       912        96
VIS    2025250     20200   20.9300  144.4400       8.9        75       909        97
VIS    2025250     20200   20.9400  144.4000       8.8        80       908        99
VIS    2025250     20200   20.9500  144.3900       8.5        81       908        99
VIS    2025250     20200   20.9300  144.3500       8.2        80       915        98
VIS    2025250     20200   20.9300  144.3200       8.4        79       919        97
VIS    2025250     20200   20.9400  144.3200       8.4        80       919        97
VIS    2025250     20200   20.9400  144.2900       8.4        81       909        98
VIS    2025250     20200   20.9300  144.2500       8.4        83       905        99
VIS    2025250     20200   20.9300  144.2400       8.3        82       905        98
VIS    2025250     20200   20.9400  144.2000       8.1        83       906        96
VIS    2025250     20200   20.9300  144.1900       8.2        84       907        95
VIS    2025250     20200   20.9500  144.1700       7.9        86       910        96
VIS    2025250     20200   20.9500  144.1400       7.9        85       917        99
VIS    2025250     20200   20.9400  144.1100       8.1        83       916       100
VIS    2025250     20200   20.9500  144.0900       8.2        83       916        98
VIS    2025250     20200   20.9500  144.0700       8.5        82       916        98
VIS    2025250     20200   20.9400  144.0400       8.6        86       920        99
VIS    2025250     20200   20.9400  144.0100       8.7        84       931        94
VIS    2025250     20200   20.9400  143.9800       8.2        76       937        90
VIS    2025250     20200   20.9400  143.9700       8.2        75       937        92
VIS    2025250     20200   20.9500  143.9400       8.0        75       937        94
VIS    2025250     20200   20.9500  143.9100       8.3        78       958        94
VIS    2025250     20200   20.9400  143.8800       8.9        81       951        96
VIS    2025250     20200   20.9500  143.8500       9.1        79       932        99
VIS    2025250     20200   20.9400  143.8500       9.2        77       932        99
VIS    2025250     20200   20.9400  143.6100      10.7        73       959        98
VIS    2025250     20200   20.9400  143.6100      10.9        73       957        98
VIS    2025250     20200   20.9300  143.5800      10.9        72       926        95
VIS    2025250     20200   20.9300  143.5600      10.7        73       922        95
VIS    2025250     20200   20.9400  143.5200      10.5        83       921        97
VIS    2025250     20200   20.9400  143.5100      10.5        83       921        98
VIS    2025250     20200   20.9300  143.4700      10.3        84       923        99
VIS    2025250     20200   20.9200  143.4400      10.3        90       923        98
VIS    2025250     20200   20.9200  143.1300      10.1        99       970        91
VIS    2025250     20200   20.9200  143.1200      10.5        98       968        92
VIS    2025250     20200   20.9300  143.0900      10.1        96       971        90
VIS    2025250     20200   20.9300  143.0600      10.1        91       952        93
VIS    2025250     20200   20.9200  143.0300       9.5        88       921        98
VIS    2025250     20200   20.9200  143.0000       9.3        84       909        97
VIS    2025250     20200   20.9400  142.9900       9.4        80       912        96
VIS    2025250     20200   20.9200  142.9800       9.4        80       904        95
VIS    2025250     20200   20.9300  142.9300       9.8        71       904        91
VIS    2025250     20200   20.9300  142.9100       9.6        71       904        91
VIS    2025250     20200   20.9400  142.8800       9.5        74       899        91
VIS    2025250     20200   20.9400  142.8700       9.4        75       893        90
VIS    2025250     20200   20.9300  142.8300       9.1        75       875        90
VIS    2025250     20200   20.9300  142.8200       8.9        76       875        91
VIS    2025250     20200   20.9300  142.8000       8.5        77       875        90
VIS    2025250     20200   20.9200  142.7400       9.0        71       914        90
VIS    2025250     20200   20.9400  142.5900       9.9        80       975        94
VIS    2025250     20200   20.9200  142.5800      10.3        80       974        96
VIS    2025250     20200   20.9400  142.5600      10.0        80       974        98
VIS    2025250     20200   20.9200  142.5200      10.1        84       937       100
VIS    2025250     20200   20.9200  142.5000      10.4        81       897        92
VIS    2025250     20200   20.9300  141.8800       9.1        74       956        91
VIS    2025250     20200   20.9100  141.8200       9.8        72       980        96
VIS    2025250     20200   20.9300  141.7700       9.6        79       962        93
VIS    2025250     20200   20.9300  141.7600       9.6        81       962        93
VIS    2025250     20200   20.9100  141.5700       9.4        87       921        93
VIS    2025250     20200   20.9300  141.5600       9.6        89       921        95
VIS    2025250     20200   20.9100  141.5400      10.0        85       959        92
VIS    2025250     20200   20.9300  141.4300      10.2        82       910        90
VIS    2025250     20200   20.9100  141.3400       9.4        80       934        95
VIS    2025250     20200   20.9300  141.3100       9.2        81       968        92
VIS    2025250     20200   20.9200  141.2900       9.7        82       968        93
VIS    2025250     20200   20.9100  141.2700       9.9        84       953        96
VIS    2025250     20200   20.9300  141.2300      10.2        85       943        98
VIS    2025250     20200   20.9100  141.2200       9.9        83       930        95
VIS    2025250     20200   20.9300  141.1800      10.3        77       965        98
VIS    2025250     20200   20.9300  141.1600      10.4        79       968        98
VIS    2025250     20200   20.9300  141.1500      10.4        81       968        97
VIS    2025250     20200   20.9100  141.1000      10.7        81       975        90
VIS    2025250     20200   20.9200  141.0600       9.6        79       968        95
VIS    2025250     20200   20.9200  141.0300       9.7        79       966        98
VIS    2025250     20200   20.9200  141.0100      10.0        82       964        98
VIS    2025250     20200   20.9200  140.9800       9.8        82       959        99
VIS    2025250     20200   20.9200  140.9800       9.8        82       959        99
VIS    2025250     20200   20.9200  140.9400      10.5        80       919        91
VIS    2025250     20200   20.9300  140.9200      10.4        79       919        90
VIS    2025250     20200   20.9300  140.8900      10.2        80       922        91
VIS    2025250     20200   20.9200  140.8400       9.9        80       925        93
VIS    2025250     20200   20.9300  140.8200      10.0        80       927        94
VIS    2025250     20200   20.9200  140.7900       9.9        82       927        95
VIS    2025250     20200   20.9200  140.7600      10.0        79       927        92
VIS    2025250     20200   20.9200  140.7300       9.8        79       919        90
VIS    2025250     20200   20.9300  140.7100       9.9        85       922        95
VIS    2025250     20200   20.9200  140.6600       9.9        85       928        95
VIS    2025250     20200   20.9100  140.6400       9.9        86       925        95
VIS    2025250     20200   20.9200  140.6200      10.0        86       925        94
VIS    2025250     20200   20.9200  140.6000       9.6        85       925        95
VIS    2025250     20200   20.9100  140.5800      10.1        84       933        98
VIS    2025250     20200   20.9100  140.5400      10.2        89       936        99
VIS    2025250     20200   20.9100  140.5400      10.1        89       938        99
VIS    2025250     20200   20.9100  140.5000      10.1        87       944        94
VIS    2025250     20200   20.9100  140.4900      10.1        87       947        94
VIS    2025250     20200   20.9200  140.4600      10.1        86       965        95
VIS    2025250     20200   20.9100  140.4300      10.3        90       945        95
VIS    2025250     20200   20.9200  140.4100       9.5        92       941        98
VIS    2025250     20200   20.9600  147.7300       5.6        76       988        96
VIS    2025250     20200   20.9400  147.7200       6.1        86       982        93
VIS    2025250     20200   20.9600  147.4100       6.0        76       987        95
VIS    2025250     20200   20.9200  145.4100       9.9        80       965        92
VIS    2025250     20200   20.9400  145.3900       9.9        73       971        94
VIS    2025250     20200   20.9200  145.3700      10.4        76       969        92
VIS    2025250     20200   20.9400  145.3400      10.3        73       967        91
VIS    2025250     20200   20.9300  145.3100       9.9        69       914        90
VIS    2025250     20200   20.9300  145.2900       9.5        69       905        92
VIS    2025250     20200   20.9200  145.2700       9.2        68       901        92
VIS    2025250     20200   20.9300  145.2500       9.0        69       899        93
VIS    2025250     20200   20.9200  145.2300       8.9        69       900        92
VIS    2025250     20200   20.9300  145.1300       8.2        80       898        96
VIS    2025250     20200   20.9300  145.1100       8.2        84       898        96
VIS    2025250     20200   20.9300  145.1000       8.3        85       898        96
VIS    2025250     20200   20.9100  145.0700       9.2        82       899        98
VIS    2025250     20200   20.9100  145.0400       9.3        81       901        97
VIS    2025250     20200   20.9300  145.0200       9.2        79       899        98
VIS    2025250     20200   20.9300  145.0000       9.1        77       897        98
VIS    2025250     20200   20.9200  144.9600       9.0        74       896        96
VIS    2025250     20200   20.9300  144.9500       9.0        76       898        97
VIS    2025250     20200   20.9200  144.9300       8.7        77       896        96
VIS    2025250     20200   20.9300  144.8900       8.9        77       897        98
VIS    2025250     20200   20.9200  144.8700       9.0        78       899        97
VIS    2025250     20200   20.9300  144.8400       9.1        76       900        93
VIS    2025250     20200   20.9300  144.7800       9.3        74       902        90
VIS    2025250     20200   20.9300  144.7500       8.9        79       903        95
VIS    2025250     20200   20.9100  144.7300       8.2        79       905        97
VIS    2025250     20200   20.9200  144.6900       7.7        82       906        98
VIS    2025250     20200   20.9200  144.6700       8.1        81       906        99
VIS    2025250     20200   20.9200  144.6400       8.9        78       905        98
VIS    2025250     20200   20.9300  144.6200       9.2        78       905        97
VIS    2025250     20200   20.9100  144.6000       9.0        77       905        98
VIS    2025250     20200   20.9100  144.5700       8.5        74       908        98
VIS    2025250     20200   20.9200  144.5500       8.4        74       916        98
VIS    2025250     20200   20.9200  144.5300       8.3        73       915        98
VIS    2025250     20200   20.9200  144.5000       8.7        76       913        99
VIS    2025250     20200   20.9200  144.4800       8.6        76       916        99
VIS    2025250     20200   20.9100  144.4400       9.1        76       909        97
VIS    2025250     20200   20.9300  144.4300       9.1        77       909        98
VIS    2025250     20200   20.9300  144.4100       9.2        78       908        98
VIS    2025250     20200   20.9200  144.3900       8.7        80       913        99
VIS    2025250     20200   20.9200  144.3500       8.2        80       914        98
VIS    2025250     20200   20.9300  144.3200       8.4        79       919        96
VIS    2025250     20200   20.9100  144.3100       8.6        78       907        96
VIS    2025250     20200   20.9200  144.2700       8.5        83       905        98
VIS    2025250     20200   20.9100  144.2600       8.5        84       905        97
VIS    2025250     20200   20.9100  144.2400       8.2        83       906        97
VIS    2025250     20200   20.9100  144.2100       8.1        82       906        96
VIS    2025250     20200   20.9200  144.1800       8.3        83       910        97
VIS    2025250     20200   20.9200  144.1400       7.9        83       914        99
VIS    2025250     20200   20.9000  144.1300       8.1        82       915        99
VIS    2025250     20200   20.9000  144.1100       8.2        85       916        99
VIS    2025250     20200   20.9100  144.0700       8.6        89       921        92
VIS    2025250     20200   20.9100  144.0600       8.5        87       920        95
VIS    2025250     20200   20.9000  144.0300       8.0        86       930        97
VIS    2025250     20200   20.9200  144.0000       8.6        83       938        96
VIS    2025250     20200   20.9200  143.9900       8.5        78       938        97
VIS    2025250     20200   20.9200  143.9600       8.2        76       935        98
VIS    2025250     20200   20.9100  143.9300       9.0        79       937        96
VIS    2025250     20200   20.9200  143.9100       8.8        85       959        95
VIS    2025250     20200   20.9100  143.8800       9.0        87       954        96
VIS    2025250     20200   20.9200  143.6200      10.6        78       959        98
VIS    2025250     20200   20.9000  143.5900      10.6        77       930        98
VIS    2025250     20200   20.9000  143.5800      10.6        75       926        96
VIS    2025250     20200   20.9200  143.5600      10.6        73       922        95
VIS    2025250     20200   20.9000  143.5300      10.7        84       923        92
VIS    2025250     20200   20.9000  143.5100      10.8        85       923        97
VIS    2025250     20200   20.9200  143.4700      10.5        84       924        98
VIS    2025250     20200   20.9100  143.4600      10.3        86       927        99
VIS    2025250     20200   20.9000  143.2000       9.9        94       984        91
VIS    2025250     20200   20.9100  143.1200      10.3        98       968        92
VIS    2025250     20200   20.9000  143.1000      10.1        94       955        94
VIS    2025250     20200   20.9000  143.0800       9.8        90       938        96
VIS    2025250     20200   20.9100  143.0400       9.6        90       921        97
VIS    2025250     20200   20.9100  143.0200       9.1        88       909        98
VIS    2025250     20200   20.9200  143.0000       9.3        84       907        96
VIS    2025250     20200   20.9100  142.9800       9.1        81       899        95
VIS    2025250     20200   20.9100  142.9600       9.2        76       899        93
VIS    2025250     20200   20.9200  142.8300       9.1        75       875        90
VIS    2025250     20200   20.9000  142.5900      10.6        83       974        98
VIS    2025250     20200   20.9000  142.5800      10.7        84       974        97
VIS    2025250     20200   20.9100  142.5400      10.0        86       947        96
VIS    2025250     20200   20.9100  142.5100       9.8        80       885        90
VIS    2025250     20200   20.8900  141.8400       9.4        78       978        93
VIS    2025250     20200   20.9000  141.7900       9.6        73       987        94
VIS    2025250     20200   20.9100  141.7600      10.0        75       950        96
VIS    2025250     20200   20.9000  141.5500       9.6        84       980        93
VIS    2025250     20200   20.8900  141.5500       9.7        83       980        94
VIS    2025250     20200   20.9000  141.5100      10.3        78       937        96
VIS    2025250     20200   20.9100  141.4300      10.8        82       932        98
VIS    2025250     20200   20.9100  141.4300      11.0        82       932        98
VIS    2025250     20200   20.9000  141.3600       9.4        81       935        93
VIS    2025250     20200   20.9000  141.3500       9.6        79       935        92
VIS    2025250     20200   20.8900  141.3100      10.2        79       968        98
VIS    2025250     20200   20.8900  141.3000      10.4        79       964        96
VIS    2025250     20200   20.8900  141.2600      10.2        83       948        97
VIS    2025250     20200   20.9100  141.2600       9.9        86       943        96
VIS    2025250     20200   20.8900  141.2100       9.2        82       940        96
VIS    2025250     20200   20.8900  141.2100       9.2        82       940        96
VIS    2025250     20200   20.9000  141.1800       9.6        82       962        97
VIS    2025250     20200   20.8900  141.1600      10.2        89       962        96
VIS    2025250     20200   20.9000  141.1100      11.2        87       975        92
VIS    2025250     20200   20.9000  141.1000      10.7        82       975        92
VIS    2025250     20200   20.8900  141.0800      10.1        85       962        97
VIS    2025250     20200   20.9000  141.0600       9.7        83       962        96
VIS    2025250     20200   20.9100  141.0300      10.0        85       962        96
VIS    2025250     20200   20.9100  141.0100      10.2        84       962        96
VIS    2025250     20200   20.8900  140.9900      10.1        85       952        97
VIS    2025250     20200   20.8800  140.9600      10.0        83       925        95
VIS    2025250     20200   20.8800  140.9000      10.0        79       916        91
VIS    2025250     20200   20.8900  140.8700      10.0        78       925        92
VIS    2025250     20200   20.9000  140.8500       9.7        81       932        96
VIS    2025250     20200   20.9000  140.8200       9.9        81       930        95
VIS    2025250     20200   20.8800  140.8100       9.8        81       932        97
VIS    2025250     20200   20.8900  140.7700      10.2        78       927        94
VIS    2025250     20200   20.8900  140.7600      10.3        76       927        92
VIS    2025250     20200   20.8800  140.6700      10.1        83       919        92
VIS    2025250     20200   20.9000  140.6400       9.8        86       919        94
VIS    2025250     20200   20.8900  140.6000      10.1        83       908        90
VIS    2025250     20200   20.8800  140.5900      10.3        84       908        90
VIS    2025250     20200   20.8900  140.5500      10.2        92       933        99
VIS    2025250     20200   20.9000  140.5400      10.2        90       934        99
VIS    2025250     20200   20.9000  140.5100      10.2        89       940        97
VIS    2025250     20200   20.9000  140.4900      10.2        86       944        95
VIS    2025250     20200   20.9000  140.4600      10.5        85       937        94
VIS    2025250     20200   20.9300  147.7400       6.8        95       988        90
VIS    2025250     20200   20.9300  147.7200       6.7        94       988        90
VIS    2025250     20200   20.9100  146.6300       7.3        81       984        97
VIS    2025250     20200   20.8900  145.4000      10.1        83       965        91
VIS    2025250     20200   20.9000  145.4000      10.3        81       965        91
VIS    2025250     20200   20.9100  145.3600      10.4        75       969        90
VIS    2025250     20200   20.8900  145.2800       9.9        64       902        90
VIS    2025250     20200   20.9100  145.2300       8.6        68       899        91
VIS    2025250     20200   20.8900  145.2200       8.1        69       900        93
VIS    2025250     20200   20.9000  145.1900       8.6        77       900        93
VIS    2025250     20200   20.9000  145.1800       8.7        78       900        95
VIS    2025250     20200   20.8900  145.1400       8.3        75       900        95
VIS    2025250     20200   20.9000  145.1300       8.1        76       899        98
VIS    2025250     20200   20.8900  145.0900       8.6        78       897        96
VIS    2025250     20200   20.8900  145.0700       8.9        78       899        96
VIS    2025250     20200   20.9000  145.0400       9.2        81       900        98
VIS    2025250     20200   20.9000  145.0200       9.2        82       899        98
VIS    2025250     20200   20.8900  144.9900       9.2        79       897        97
VIS    2025250     20200   20.9100  144.9600       9.1        75       896        96
VIS    2025250     20200   20.9000  144.9400       8.7        76       896        96
VIS    2025250     20200   20.9000  144.9100       8.6        80       897        95
VIS    2025250     20200   20.9000  144.8800       8.8        84       899        97
VIS    2025250     20200   20.8900  144.8600       8.8        80       900        96
VIS    2025250     20200   20.9000  144.8600       9.1        80       900        97
VIS    2025250     20200   20.8900  144.8100       9.8        74       902        93
VIS    2025250     20200   20.8900  144.7700       9.6        74       903        91
VIS    2025250     20200   20.9000  144.7500       9.0        76       905        91
VIS    2025250     20200   20.9000  144.7300       8.0        79       906        97
VIS    2025250     20200   20.9000  144.6900       7.8        81       906        99
VIS    2025250     20200   20.9000  144.6800       8.2        80       906        99
VIS    2025250     20200   20.9000  144.6400       9.1        77       904        97
VIS    2025250     20200   20.8800  144.6200       9.1        75       906        97
VIS    2025250     20200   20.8800  144.6100       9.0        76       906        98
VIS    2025250     20200   20.9000  144.5800       8.6        75       908        98
VIS    2025250     20200   20.9000  144.5600       8.5        73       908        97
VIS    2025250     20200   20.9000  144.5300       8.6        73       908        97
VIS    2025250     20200   20.8900  144.5000       8.8        76       909        98
VIS    2025250     20200   20.9000  144.4600       9.1        78       912        97
VIS    2025250     20200   20.9000  144.4400       9.1        77       909        97
VIS    2025250     20200   20.9000  144.4300       9.1        77       909        97
VIS    2025250     20200   20.8800  144.4000       8.5        79       914        98
VIS    2025250     20200   20.9000  144.3700       8.4        80       914        99
VIS    2025250     20200   20.9000  144.3500       8.1        79       913        99
VIS    2025250     20200   20.9000  144.3200       8.6        77       906        95
VIS    2025250     20200   20.9000  144.3100       8.8        78       906        95
VIS    2025250     20200   20.9000  144.2900       8.6        79       905        98
VIS    2025250     20200   20.8800  144.2400       8.5        82       906        99
VIS    2025250     20200   20.8800  144.2400       8.5        81       906        99
VIS    2025250     20200   20.8900  144.2000       8.2        81       909        95
VIS    2025250     20200   20.8800  144.1800       8.6        79       912        96
VIS    2025250     20200   20.8800  144.1500       8.5        79       914        96
VIS    2025250     20200   20.8900  144.1300       8.4        81       915        97
VIS    2025250     20200   20.8800  144.1000       8.8        93       921        94
VIS    2025250     20200   20.8800  144.0700       8.7        93       923        94
VIS    2025250     20200   20.8800  144.0600       8.5        89       925        96
VIS    2025250     20200   20.8900  144.0400       7.9        85       927        97
VIS    2025250     20200   20.8900  143.9900       8.9        84       936        99
VIS    2025250     20200   20.9000  143.9800       8.9        80       937        99
VIS    2025250     20200   20.9000  143.9600       8.9        79       937        99
VIS    2025250     20200   20.8800  143.9200       8.5        77       931        97
VIS    2025250     20200   20.9000  143.9200       9.2        81       936        98
VIS    2025250     20200   20.8900  143.8900       8.9        90       942        95
VIS    2025250     20200   20.8800  143.6100      10.8        84       963        98
VIS    2025250     20200   20.9000  143.5900      10.6        81       957        99
VIS    2025250     20200   20.8700  143.5600      10.4        79       928        98
VIS    2025250     20200   20.8900  143.5400      10.7        80       923        92
VIS    2025250     20200   20.8900  143.5300      10.7        84       923        92
VIS    2025250     20200   20.8800  143.5100      10.3        84       928        98
VIS    2025250     20200   20.8700  143.2000       9.6        88       964        93
VIS    2025250     20200   20.8800  143.1800       9.2        90       964        94
VIS    2025250     20200   20.8800  143.1700       9.0        89       964        94
VIS    2025250     20200   20.8900  143.1500       9.1        94       968        92
VIS    2025250     20200   20.8700  143.1100       9.8        87       934        95
VIS    2025250     20200   20.8700  143.0800       9.4        82       909        94
VIS    2025250     20200   20.8800  143.0700       9.3        83       909        95
VIS    2025250     20200   20.8700  143.0500       9.3        74       887        90
VIS    2025250     20200   20.8900  143.0100       9.0        81       887        94
VIS    2025250     20200   20.8800  142.9800       9.3        75       881        91
VIS    2025250     20200   20.8700  142.9600       9.1        74       881        90
VIS    2025250     20200   20.8900  142.9300       8.9        72       893        90
VIS    2025250     20200   20.8900  142.5900      10.9        84       974        97
VIS    2025250     20200   20.8700  142.5800      10.9        87       969        92
VIS    2025250     20200   20.8700  142.5500      10.6        84       921        96
VIS    2025250     20200   20.8700  141.9900      10.3        74       916        92
VIS    2025250     20200   20.8600  141.9300       9.9        73       975        96
VIS    2025250     20200   20.8600  141.9100       9.8        71       975        92
VIS    2025250     20200   20.8800  141.8500       9.7        76       955        92
VIS    2025250     20200   20.8600  141.8300       9.2        79       964        90
VIS    2025250     20200   20.8700  141.5600       9.6        85       980        94
VIS    2025250     20200   20.8700  141.5300      10.1        80       937        98
VIS    2025250     20200   20.8600  141.4300      10.2        81       975        97
VIS    2025250     20200   20.8700  141.3900      10.5        78       969        99
VIS    2025250     20200   20.8600  141.3800      10.5        78       969        99
VIS    2025250     20200   20.8600  141.3400      10.9        81       964        99
VIS    2025250     20200   20.8800  141.3200      10.2        79       968        98
VIS    2025250     20200   20.8800  141.3000      10.4        80       960        97
VIS    2025250     20200   20.8700  141.2600      10.1        84       940        97
VIS    2025250     20200   20.8700  141.2400       9.8        82       943        95
VIS    2025250     20200   20.8700  141.2300       9.6        81       940        94
VIS    2025250     20200   20.8700  141.2000       9.2        81       940        95
VIS    2025250     20200   20.8800  141.1800       9.4        85       952        97
VIS    2025250     20200   20.8700  141.1400      10.8        87       961        98
VIS    2025250     20200   20.8600  141.1300      10.8        86       939        99
VIS    2025250     20200   20.8600  141.0900      10.2        83       922        94
VIS    2025250     20200   20.8700  141.0800      10.4        86       939        99
VIS    2025250     20200   20.8700  141.0600      10.2        87       950        97
VIS    2025250     20200   20.8600  141.0200      10.6        89       927        93
VIS    2025250     20200   20.8700  141.0100      10.7        88       952        94
VIS    2025250     20200   20.8600  140.9800      10.2        86       925        94
VIS    2025250     20200   20.8800  140.9700      10.0        83       925        95
VIS    2025250     20200   20.8800  140.9200      10.2        79       916        91
VIS    2025250     20200   20.8600  140.8900      10.1        82       934        98
VIS    2025250     20200   20.8800  140.8700       9.9        80       940        98
VIS    2025250     20200   20.8800  140.8400       9.8        84       942        99
VIS    2025250     20200   20.8800  140.8000       9.9        80       930        96
VIS    2025250     20200   20.8800  140.7700      10.2        77       925        93
VIS    2025250     20200   20.8700  140.6500       9.9        85       911        91
VIS    2025250     20200   20.8800  140.6300       9.9        86       908        91
VIS    2025250     20200   20.8700  140.6200      10.0        85       908        90
VIS    2025250     20200   20.8800  140.5900      10.1        83       908        90
VIS    2025250     20200   20.8700  140.5500      10.2        90       908        91
VIS    2025250     20200   20.8800  140.5400      10.4        91       908        92
VIS    2025250     20200   20.8900  146.7500       7.5        77       986        97
VIS    2025250     20200   20.8900  146.6300       7.2        77       967        96
VIS    2025250     20200   20.8900  146.6200       7.3        77       965        95
VIS    2025250     20200   20.8700  145.3700      10.1        78       980        93
VIS    2025250     20200   20.8700  145.3300       9.8        71       974        92
VIS    2025250     20200   20.8700  145.2500       9.2        66       900        90
VIS    2025250     20200   20.8800  145.2100       8.0        71       901        94
VIS    2025250     20200   20.8800  145.2100       8.1        72       900        95
VIS    2025250     20200   20.8800  145.1600       8.8        78       900        96
VIS    2025250     20200   20.8700  145.0900       8.7        77       897        96
VIS    2025250     20200   20.8700  145.0800       8.6        80       896        99
VIS    2025250     20200   20.8600  145.0400       8.8        82       896        98
VIS    2025250     20200   20.8700  145.0100       9.3        83       897        98
VIS    2025250     20200   20.8600  145.0100       9.2        84       897        98
VIS    2025250     20200   20.8800  144.9800       9.2        80       897        98
VIS    2025250     20200   20.8600  144.9400       9.2        81       898        95
VIS    2025250     20200   20.8600  144.9100       8.9        80       899        92
VIS    2025250     20200   20.8800  144.8900       8.7        83       901        96
VIS    2025250     20200   20.8600  144.8700       8.6        77       902        94
VIS    2025250     20200   20.8700  144.8500       8.9        74       902        94
VIS    2025250     20200   20.8600  144.8200       9.4        75       902        96
VIS    2025250     20200   20.8700  144.7900       9.9        73       903        95
VIS    2025250     20200   20.8800  144.7600       9.6        74       904        95
VIS    2025250     20200   20.8600  144.7500       8.9        75       904        98
VIS    2025250     20200   20.8700  144.7200       8.0        79       907        96
VIS    2025250     20200   20.8800  144.7000       7.8        78       907        97
VIS    2025250     20200   20.8600  144.6600       8.7        70       904        93
VIS    2025250     20200   20.8800  144.6500       8.9        71       904        95
VIS    2025250     20200   20.8700  144.6300       9.1        74       906        97
VIS    2025250     20200   20.8800  144.6100       9.0        75       906        97
VIS    2025250     20200   20.8600  144.5900       8.6        77       906        98
VIS    2025250     20200   20.8800  144.5400       8.8        73       907        97
VIS    2025250     20200   20.8600  144.5200       8.9        76       907        95
VIS    2025250     20200   20.8700  144.5100       8.9        76       907        96
VIS    2025250     20200   20.8800  144.4700       9.1        79       913        98
VIS    2025250     20200   20.8800  144.4500       9.0        78       912        97
VIS    2025250     20200   20.8700  144.4300       8.8        78       911        97
VIS    2025250     20200   20.8700  144.4000       8.2        79       914        95
VIS    2025250     20200   20.8700  144.3700       8.3        79       914        95
VIS    2025250     20200   20.8600  144.3400       8.3        79       904        94
VIS    2025250     20200   20.8700  144.3400       8.3        78       905        94
VIS    2025250     20200   20.8700  144.3100       8.1        80       904        96
VIS    2025250     20200   20.8800  144.2700       8.2        78       906        98
VIS    2025250     20200   20.8800  144.2500       8.5        81       906        99
VIS    2025250     20200   20.8800  144.2300       8.6        81       908        99
VIS    2025250     20200   20.8700  144.2200       8.4        80       910        98
VIS    2025250     20200   20.8600  144.1900       8.5        77       913        97
VIS    2025250     20200   20.8600  144.1600       8.5        77       915        98
VIS    2025250     20200   20.8500  144.1400       8.6        77       918        99
VIS    2025250     20200   20.8700  144.1100       8.7        86       921        96
VIS    2025250     20200   20.8700  144.0900       8.7        92       922        95
VIS    2025250     20200   20.8700  144.0700       8.6        90       925        95
VIS    2025250     20200   20.8600  144.0300       8.3        81       925        96
VIS    2025250     20200   20.8500  144.0100       8.9        87       925        98
VIS    2025250     20200   20.8500  143.9900       9.7        88       925        98
VIS    2025250     20200   20.8700  143.9600       9.0        82       931        99
VIS    2025250     20200   20.8600  143.9300       7.5        78       924        92
VIS    2025250     20200   20.8700  143.9100       7.8        83       929        94
VIS    2025250     20200   20.8600  143.8700       9.0        97       942        90
VIS    2025250     20200   20.8700  143.6000      10.7        84       964        97
VIS    2025250     20200   20.8600  143.5900      10.5        83       963        97
VIS    2025250     20200   20.8700  143.5600      10.5        78       928        97
VIS    2025250     20200   20.8500  143.5300      10.7        75       933        97
VIS    2025250     20200   20.8700  143.5100      10.5        80       928        97
VIS    2025250     20200   20.8500  143.4900      10.0        78       944       100
VIS    2025250     20200   20.8500  143.2100      10.1        81       964        93
VIS    2025250     20200   20.8500  143.2000       9.9        82       964        95
VIS    2025250     20200   20.8500  143.1800       9.4        80       945        99
VIS    2025250     20200   20.8500  143.1300       9.5        79       921        97
VIS    2025250     20200   20.8600  143.0900       9.5        80       909        94
VIS    2025250     20200   20.8500  143.0700       9.5        74       887        91
VIS    2025250     20200   20.8400  142.8100       8.0        75       943        92
VIS    2025250     20200   20.8600  142.7800       8.4        73       943        92
VIS    2025250     20200   20.8600  142.0500       9.5        77       916        93
VIS    2025250     20200   20.8600  141.9900      10.0        78       916        94
VIS    2025250     20200   20.8400  141.9300       9.3        73       975        92
VIS    2025250     20200   20.8500  141.9200       9.8        73       975        95
VIS    2025250     20200   20.8400  141.8800       9.7        83       934        96
VIS    2025250     20200   20.8500  141.8300       9.2        77       964        90
VIS    2025250     20200   20.8400  141.7000       9.1        82       964        93
VIS    2025250     20200   20.8400  141.6900       9.2        83       950        92
VIS    2025250     20200   20.8500  141.6400       9.3        83       967        93
VIS    2025250     20200   20.8400  141.6000       9.4        84       971        93
VIS    2025250     20200   20.8500  141.5800       9.7        85       956        95
VIS    2025250     20200   20.8500  141.5700       9.8        85       958        95
VIS    2025250     20200   20.8600  141.4700       9.6        77       921        91
VIS    2025250     20200   20.8500  141.4300       9.7        81       968        95
VIS    2025250     20200   20.8400  141.4100      10.0        80       968        92
VIS    2025250     20200   20.8500  141.3900      10.3        76       969        96
VIS    2025250     20200   20.8500  141.3700      10.5        82       970        98
VIS    2025250     20200   20.8500  141.3500      11.0        84       964        98
VIS    2025250     20200   20.8400  141.3200      10.7        81       924        94
VIS    2025250     20200   20.8400  141.3000      10.0        84       916        90
VIS    2025250     20200   20.8500  141.2700      10.0        87       954        92
VIS    2025250     20200   20.8600  141.2500      10.1        86       954        93
VIS    2025250     20200   20.8500  141.2100       9.5        82       945        96
VIS    2025250     20200   20.8600  141.1400      10.6        84       925        95
VIS    2025250     20200   20.8500  141.1100      10.4        79       914        91
VIS    2025250     20200   20.8600  141.1100      10.5        80       914        90
VIS    2025250     20200   20.8300  141.0700      10.0        86       906        91
VIS    2025250     20200   20.8300  141.0400      10.2        89       916        95
VIS    2025250     20200   20.8400  141.0100      10.6        89       916        94
VIS    2025250     20200   20.8300  141.0100      10.6        89       916        94
VIS    2025250     20200   20.8400  140.9600       9.9        84       922        94
VIS    2025250     20200   20.8400  140.9600       9.9        83       925        95
VIS    2025250     20200   20.8500  140.9300      10.0        80       927        94
VIS    2025250     20200   20.8500  140.8900      10.1        84       947        99
VIS    2025250     20200   20.8500  140.8900      10.2        83       947        99
VIS    2025250     20200   20.8400  140.8600      10.1        85       960        98
VIS    2025250     20200   20.8500  140.8300       9.7        85       945        99
VIS    2025250     20200   20.8500  140.4300      10.2        80       952        99
VIS    2025250     20200   20.8500  140.4200      10.2        80       952        99
VIS    2025250     20200   20.8800  147.5600       5.6        85       991        97
VIS    2025250     20200   20.8700  146.7200       7.5        76       975        96
VIS    2025250     20200   20.8600  146.6900       6.3        75       981        95
VIS    2025250     20200   20.8500  146.6700       6.6        72       979        93
VIS    2025250     20200   20.8400  145.3400      10.0        77       979        92
VIS    2025250     20200   20.8400  145.3200       9.8        75       954        94
VIS    2025250     20200   20.8400  145.3000       9.7        73       944        94
VIS    2025250     20200   20.8400  145.2700       9.6        66       913        91
VIS    2025250     20200   20.8500  145.2600       9.8        66       904        90
VIS    2025250     20200   20.8400  145.2300       9.4        66       902        93
VIS    2025250     20200   20.8400  145.1900       8.5        75       902        97
VIS    2025250     20200   20.8400  145.1800       8.6        76       901        96
VIS    2025250     20200   20.8600  145.1500       8.5        74       900        95
VIS    2025250     20200   20.8400  145.0900       8.8        74       900        96
VIS    2025250     20200   20.8500  145.0800       8.6        77       899        98
VIS    2025250     20200   20.8400  145.0400       8.6        82       897        98
VIS    2025250     20200   20.8500  145.0300       8.8        82       897        97
VIS    2025250     20200   20.8400  145.0000       9.1        83       899        97
VIS    2025250     20200   20.8500  144.9800       9.1        84       898        98
VIS    2025250     20200   20.8600  144.9400       9.1        81       898        95
VIS    2025250     20200   20.8400  144.9200       8.9        77       899        90
VIS    2025250     20200   20.8600  144.9100       8.9        78       899        91
VIS    2025250     20200   20.8400  144.8800       9.0        72       903        90
VIS    2025250     20200   20.8500  144.8400       9.1        75       902        92
VIS    2025250     20200   20.8500  144.8400       9.1        75       902        92
VIS    2025250     20200   20.8300  144.8000       8.4        76       903        95
VIS    2025250     20200   20.8400  144.7700       8.6        75       903        97
VIS    2025250     20200   20.8500  144.7500       8.9        75       904        98
VIS    2025250     20200   20.8300  144.7400       8.8        74       906        97
VIS    2025250     20200   20.8500  144.7100       8.4        77       907        97
VIS    2025250     20200   20.8400  144.6900       8.7        74       905        96
VIS    2025250     20200   20.8300  144.6400       8.4        73       903        96
VIS    2025250     20200   20.8500  144.6300       8.9        73       906        96
VIS    2025250     20200   20.8400  144.6100       8.7        76       905        97
VIS    2025250     20200   20.8400  144.5900       8.7        77       905        95
VIS    2025250     20200   20.8300  144.5500       8.7        75       905        93
VIS    2025250     20200   20.8500  144.5200       9.2        76       907        96
VIS    2025250     20200   20.8300  144.5100       9.2        76       908        97
VIS    2025250     20200   20.8300  144.4700       9.1        78       911        99
VIS    2025250     20200   20.8400  144.4700       9.0        79       912        99
VIS    2025250     20200   20.8500  144.4400       8.8        80       912        97
VIS    2025250     20200   20.8400  144.4000       8.4        81       914        95
VIS    2025250     20200   20.8300  144.3900       8.6        79       913        94
VIS    2025250     20200   20.8300  144.3500       8.4        78       904        95
VIS    2025250     20200   20.8400  144.3400       8.3        79       904        94
VIS    2025250     20200   20.8400  144.3200       8.1        79       904        96
VIS    2025250     20200   20.8300  144.2900       8.3        81       907        97
VIS    2025250     20200   20.8300  144.2600       8.5        84       909        96
VIS    2025250     20200   20.8400  144.2400       8.9        85       910        99
VIS    2025250     20200   20.8500  144.2000       8.6        79       913        98
VIS    2025250     20200   20.8500  144.1900       8.6        77       914        97
VIS    2025250     20200   20.8500  144.1600       8.5        77       918        98
VIS    2025250     20200   20.8400  144.1400       8.4        74       920        97
VIS    2025250     20200   20.8400  144.1100       8.6        75       922        97
VIS    2025250     20200   20.8300  144.0900       8.6        78       923        96
VIS    2025250     20200   20.8300  144.0600       8.5        81       923        97
VIS    2025250     20200   20.8400  144.0400       8.4        82       924        98
VIS    2025250     20200   20.8300  144.0200       9.1        90       923        98
VIS    2025250     20200   20.8300  143.9800       9.0        79       922        97
VIS    2025250     20200   20.8400  143.9700       9.1        80       923        95
VIS    2025250     20200   20.8500  143.9300       7.3        87       923        94
VIS    2025250     20200   20.8300  143.9100       8.7       101       924        93
VIS    2025250     20200   20.8500  143.8700       9.1        90       937        93
VIS    2025250     20200   20.8400  143.6000      10.6        84       964        95
VIS    2025250     20200   20.8400  143.5700      10.2        78       942        97
VIS    2025250     20200   20.8300  143.5500      10.6        72       937        97
VIS    2025250     20200   20.8300  143.5400      10.8        73       934        97
VIS    2025250     20200   20.8400  143.2200      10.6        78       978        91
VIS    2025250     20200   20.8300  143.2100      10.4        76       964        97
VIS    2025250     20200   20.8400  143.1700       9.7        75       937        99
VIS    2025250     20200   20.8300  143.1500      10.0        73       921        94
VIS    2025250     20200   20.8300  143.0600       9.8        73       887        90
VIS    2025250     20200   20.8300  143.0500       9.8        72       884        90
VIS    2025250     20200   20.8200  142.8800       8.1        75       935        94
VIS    2025250     20200   20.8400  142.8300       7.8        75       914        93
VIS    2025250     20200   20.8200  142.8000       9.0        74       973        95
VIS    2025250     20200   20.8200  142.7900       9.6        74       973        97
VIS    2025250     20200   20.8400  142.6500       8.4        84       970        90
VIS    2025250     20200   20.8200  142.6000      10.5        78       948        93
VIS    2025250     20200   20.8300  142.5700      10.6        78       937        96
VIS    2025250     20200   20.8300  141.9100       9.8        78       936        98
VIS    2025250     20200   20.8200  141.8900       9.7        84       934        99
VIS    2025250     20200   20.8100  141.8600       9.7        82       950        91
VIS    2025250     20200   20.8100  141.8400       9.9        72       944        92
VIS    2025250     20200   20.8200  141.8300       9.9        72       944        91
VIS    2025250     20200   20.8300  141.7000       9.2        81       964        94
VIS    2025250     20200   20.8300  141.6200       9.4        86       967        92
VIS    2025250     20200   20.8200  141.6000       9.7        81       967        97
VIS    2025250     20200   20.8100  141.5800      10.4        75       947        99
VIS    2025250     20200   20.8100  141.4600       9.8        83       971        96
VIS    2025250     20200   20.8300  141.4200      10.1        80       968        94
VIS    2025250     20200   20.8200  141.4000      10.2        80       962        97
VIS    2025250     20200   20.8100  141.3800      10.2        83       965        97
VIS    2025250     20200   20.8100  141.3500      11.0        85       930        98
VIS    2025250     20200   20.8100  141.3200      10.6        85       916        94
VIS    2025250     20200   20.8100  141.3200      10.5        85       916        95
VIS    2025250     20200   20.8200  141.2900       9.8        87       930        95
VIS    2025250     20200   20.8300  141.2600      10.0        88       956        94
VIS    2025250     20200   20.8300  141.2400      10.3        85       956        96
VIS    2025250     20200   20.8200  141.1300      10.4        83       908        91
VIS    2025250     20200   20.8100  141.1200      10.1        83       906        90
VIS    2025250     20200   20.8200  141.0700       9.9        86       906        90
VIS    2025250     20200   20.8100  141.0500      10.1        89       914        95
VIS    2025250     20200   20.8300  141.0100      10.5        88       916        93
VIS    2025250     20200   20.8200  140.9700       9.9        83       916        92
VIS    2025250     20200   20.8100  140.9400       9.7        86       922        96
VIS    2025250     20200   20.8300  140.9000      10.0        86       947        98
VIS    2025250     20200   20.8100  140.8800      10.2        88       959        97
VIS    2025250     20200   20.8100  140.8600      10.0        85       950        94
VIS    2025250     20200   20.8100  140.8400       9.6        84       930        94
VIS    2025250     20200   20.8100  140.8300       9.6        86       916        93
VIS    2025250     20200   20.8300  140.7800       9.7        81       914        91
VIS    2025250     20200   20.8200  140.7600       9.4        82       911        90
VIS    2025250     20200   20.8100  140.6100       9.8        88       911        92
VIS    2025250     20200   20.8100  140.5900      10.1        90       937        99
VIS    2025250     20200   20.8100  140.5300       9.8        89       931        99
VIS    2025250     20200   20.8200  140.4600      10.3        84       976        99
VIS    2025250     20200   20.8200  140.4200      10.0        89       984        95
VIS    2025250     20200   20.8100  140.4000      10.1        89       968        90
VIS    2025250     20200   20.8300  146.8600       7.3        71       974        90
VIS    2025250     20200   20.8400  146.7000       6.7        74       977        99
VIS    2025250     20200   20.8200  145.3400       9.8        72       979        92
VIS    2025250     20200   20.8300  145.3100       9.6        74       954        94
VIS    2025250     20200   20.8200  145.3100       9.5        72       954        94
VIS    2025250     20200   20.8200  145.2800       9.4        68       931        92
VIS    2025250     20200   20.8200  145.2600       9.7        66       908        93
VIS    2025250     20200   20.8300  145.2300       9.3        67       903        94
VIS    2025250     20200   20.8200  145.2000       8.5        72       902        97
VIS    2025250     20200   20.8200  145.1600       8.4        74       900        93
VIS    2025250     20200   20.8300  145.1600       8.6        75       900        91
VIS    2025250     20200   20.8100  145.1200       8.4        76       905        94
VIS    2025250     20200   20.8300  145.0900       8.9        73       901        97
VIS    2025250     20200   20.8200  145.0800       8.6        76       901        97
VIS    2025250     20200   20.8100  145.0500       8.0        78       900        99
VIS    2025250     20200   20.8300  145.0300       8.7        83       899        97
VIS    2025250     20200   20.8300  144.9900       9.0        82       899        97
VIS    2025250     20200   20.8200  144.9800       8.9        82       899        98
VIS    2025250     20200   20.8100  144.9600       8.7        83       897        98
VIS    2025250     20200   20.8300  144.8600       8.8        74       903        93
VIS    2025250     20200   20.8200  144.8300       8.4        77       903        95
VIS    2025250     20200   20.8200  144.8100       8.4        78       903        96
VIS    2025250     20200   20.8200  144.7900       8.2        77       903        95
VIS    2025250     20200   20.8300  144.7600       8.6        75       903        98
VIS    2025250     20200   20.8200  144.7300       8.9        72       905        95
VIS    2025250     20200   20.8300  144.7100       9.0        73       906        95
VIS    2025250     20200   20.8100  144.6700       8.7        73       903        97
VIS    2025250     20200   20.8300  144.6400       8.3        74       903        97
VIS    2025250     20200   20.8200  144.6400       8.3        75       903        97
VIS    2025250     20200   20.8100  144.6000       8.8        76       905        95
VIS    2025250     20200   20.8200  144.5700       8.8        74       905        91
VIS    2025250     20200   20.8300  144.5500       8.7        74       905        92
VIS    2025250     20200   20.8300  144.5300       9.0        75       905        96
VIS    2025250     20200   20.8300  144.5000       9.2        76       908        98
VIS    2025250     20200   20.8100  144.4800       9.3        78       910        98
VIS    2025250     20200   20.8100  144.4400       9.3        79       913        99
VIS    2025250     20200   20.8200  144.4400       9.2        78       912        98
VIS    2025250     20200   20.8100  144.3900       9.1        80       911        98
VIS    2025250     20200   20.8100  144.3900       9.0        79       911        98
VIS    2025250     20200   20.8100  144.3600       8.5        80       908        96
VIS    2025250     20200   20.8200  144.3400       8.3        79       906        95
VIS    2025250     20200   20.8100  144.3100       8.7        78       907        98
VIS    2025250     20200   20.8100  144.2700       8.8        82       911        98
VIS    2025250     20200   20.8200  144.2600       8.7        86       910        94
VIS    2025250     20200   20.8200  144.1300       8.9        69       922        96
VIS    2025250     20200   20.8000  144.1000       8.7        76       922        99
VIS    2025250     20200   20.8200  144.0900       8.6        77       923        97
VIS    2025250     20200   20.8200  144.0600       8.6        82       924        96
VIS    2025250     20200   20.8000  144.0200       9.3        98       924        94
VIS    2025250     20200   20.8100  144.0100       9.1        94       923        95
VIS    2025250     20200   20.8200  143.9800       8.8        80       922        98
VIS    2025250     20200   20.8200  143.9700       8.8        78       922        96
VIS    2025250     20200   20.8100  143.9300      10.2       100       922        92
VIS    2025250     20200   20.8200  143.9100       9.0       101       924        93
VIS    2025250     20200   20.8200  143.5600      10.6        72       942        96
VIS    2025250     20200   20.8100  143.2100      10.4        75       964        97
VIS    2025250     20200   20.8000  143.1900      10.4        72       936        98
VIS    2025250     20200   20.8100  143.1600      10.3        69       917        93
VIS    2025250     20200   20.8100  142.8900       8.0        76       944        92
VIS    2025250     20200   20.8000  142.8300       8.9        77       963        92
VIS    2025250     20200   20.8100  142.8300       8.9        75       963        93
VIS    2025250     20200   20.8000  142.7300       9.8        81       944        93
VIS    2025250     20200   20.7900  142.6300      10.7        74       978        91
VIS    2025250     20200   20.7900  142.6200      10.3        77       970        94
VIS    2025250     20200   20.7900  142.6000      10.3        77       961        98
VIS    2025250     20200   20.8100  142.5800      10.4        77       944        95
VIS    2025250     20200   20.8000  142.2100      10.2        75       914        91
VIS    2025250     20200   20.7900  142.1300      10.4        73       942        92
VIS    2025250     20200   20.7900  141.9700       9.7        75       955        95
VIS    2025250     20200   20.7900  141.9700       9.6        75       955        95
VIS    2025250     20200   20.7900  141.9400       9.6        74       932        92
VIS    2025250     20200   20.8100  141.9200       9.4        78       932        96
VIS    2025250     20200   20.7900  141.8700       9.7        80       964        95
VIS    2025250     20200   20.7900  141.8500      10.3        77       934        93
VIS    2025250     20200   20.7900  141.8000       9.6        75       918        90
VIS    2025250     20200   20.8000  141.7700       9.6        74       955        97
VIS    2025250     20200   20.8100  141.5800      10.6        73       947        98
VIS    2025250     20200   20.8100  141.4600       9.8        85       971        96
VIS    2025250     20200   20.7900  141.4400      10.3        84       962        98
VIS    2025250     20200   20.8100  141.4200      10.2        82       962        97
VIS    2025250     20200   20.8000  141.3800      10.3        85       962        97
VIS    2025250     20200   20.7900  141.3800      10.5        86       956        98
VIS    2025250     20200   20.8100  141.3400      11.0        84       919        95
VIS    2025250     20200   20.8100  141.3200      10.6        85       916        95
VIS    2025250     20200   20.8100  141.3100      10.1        86       916        95
VIS    2025250     20200   20.8000  141.2600      10.2        85       935        96
VIS    2025250     20200   20.8000  141.1400      10.1        86       908        92
VIS    2025250     20200   20.8000  141.1100      10.2        86       908        92
VIS    2025250     20200   20.7800  141.1100      10.1        85       908        91
VIS    2025250     20200   20.7900  141.0700      10.2        85       914        92
VIS    2025250     20200   20.7900  141.0600      10.3        85       919        94
VIS    2025250     20200   20.7900  141.0200      10.9        86       919        94
VIS    2025250     20200   20.8000  140.9700      10.1        85       914        92
VIS    2025250     20200   20.8000  140.9600       9.9        85       914        92
VIS    2025250     20200   20.7800  140.9200       9.9        92       911        96
VIS    2025250     20200   20.7800  140.9000      10.0        93       934       100
VIS    2025250     20200   20.7800  140.8700      10.3        93       937        99
VIS    2025250     20200   20.8000  140.8600      10.2        87       937        91
VIS    2025250     20200   20.7800  140.8000       9.9        86       908        91
VIS    2025250     20200   20.7900  140.7800      10.0        88       911        94
VIS    2025250     20200   20.8000  140.6400      10.3        79       922        90
VIS    2025250     20200   20.7800  140.5700      10.3        90       958        98
VIS    2025250     20200   20.8000  140.5300       9.9        89       931        99
VIS    2025250     20200   20.8000  140.5100      10.1        85       963        99
VIS    2025250     20200   20.7800  140.4900      10.0        81       991        93
VIS    2025250     20200   20.7800  140.4500       9.7        83       978        93
VIS    2025250     20200   20.7800  140.4400       9.9        86       962        95
VIS    2025250     20200   20.7900  140.4100      10.1        88       962        92
VIS    2025250     20200   20.8200  147.6300       5.1        73       988        96
VIS    2025250     20200   20.8200  147.6200       5.3        75       988        95
VIS    2025250     20200   20.8200  146.7700       7.3        76       977        93
VIS    2025250     20200   20.8200  146.7600       7.5        79       977        91
VIS    2025250     20200   20.8100  146.7300       7.7        78       987        95
VIS    2025250     20200   20.8000  145.3000       9.5        69       968        92
VIS    2025250     20200   20.8000  145.2500       9.6        65       908        92
VIS    2025250     20200   20.7900  145.2300       9.3        65       905        91
VIS    2025250     20200   20.8000  145.2100       8.7        71       902        96
VIS    2025250     20200   20.7900  145.1700       8.4        73       900        94
VIS    2025250     20200   20.7900  145.1600       8.3        74       900        92
VIS    2025250     20200   20.7900  145.1300       8.0        77       906        95
VIS    2025250     20200   20.8000  145.1100       8.3        77       906        95
VIS    2025250     20200   20.8000  145.0700       8.1        76       901        96
VIS    2025250     20200   20.8100  145.0500       8.0        77       900        99
VIS    2025250     20200   20.7900  145.0400       8.2        75       900        97
VIS    2025250     20200   20.8100  145.0100       8.6        80       899        99
VIS    2025250     20200   20.8100  144.9700       8.6        80       897        98
VIS    2025250     20200   20.8100  144.9600       8.6        81       897        98
VIS    2025250     20200   20.7900  144.9200       9.3        78       900        92
VIS    2025250     20200   20.7900  144.8900       9.2        75       901        94
VIS    2025250     20200   20.7900  144.8900       9.1        75       903        94
VIS    2025250     20200   20.7900  144.8400       8.3        77       903        97
VIS    2025250     20200   20.7900  144.8400       8.2        77       902        97
VIS    2025250     20200   20.7900  144.8000       8.1        80       902        99
VIS    2025250     20200   20.7900  144.7700       8.0        78       901        99
VIS    2025250     20200   20.8000  144.7500       8.4        77       902        96
VIS    2025250     20200   20.8000  144.6900       8.8        71       904        90
VIS    2025250     20200   20.7900  144.6500       8.8        72       903        95
VIS    2025250     20200   20.7900  144.6200       8.9        75       904        96
VIS    2025250     20200   20.7900  144.6100       8.9        76       904        96
VIS    2025250     20200   20.8000  144.5900       9.0        74       905        91
VIS    2025250     20200   20.7800  144.5600       9.2        73       906        93
VIS    2025250     20200   20.7900  144.5400       9.1        76       906        97
VIS    2025250     20200   20.7900  144.5100       9.0        79       910        97
VIS    2025250     20200   20.7900  144.4800       9.2        80       913        98
VIS    2025250     20200   20.8000  144.4500       9.3        79       913        99
VIS    2025250     20200   20.8000  144.4400       9.4        80       913        99
VIS    2025250     20200   20.7900  144.4000       9.1        81       908        98
VIS    2025250     20200   20.8000  144.3900       9.1        80       908        98
VIS    2025250     20200   20.8000  144.3700       8.7        80       908        98
VIS    2025250     20200   20.7800  144.3400       9.0        81       909        98
VIS    2025250     20200   20.7900  144.3200       9.0        80       909        98
VIS    2025250     20200   20.7900  144.2800       9.4        73       911        94
VIS    2025250     20200   20.7900  144.2500       8.7        81       915        93
VIS    2025250     20200   20.7800  144.2300       8.7        77       918        90
VIS    2025250     20200   20.7900  144.2200       8.7        78       918        90
VIS    2025250     20200   20.8000  144.1800       9.0        73       920        90
VIS    2025250     20200   20.7900  144.1400       9.3        69       920        95
VIS    2025250     20200   20.8000  144.1100       8.8        75       922        99
VIS    2025250     20200   20.7800  144.0800       8.8        87       922        98
VIS    2025250     20200   20.7800  144.0700       9.1        90       922        97
VIS    2025250     20200   20.7800  144.0400       9.4        95       922        93
VIS    2025250     20200   20.7800  144.0200       9.0        92       922        96
VIS    2025250     20200   20.7800  143.9900       8.6        82       922        97
VIS    2025250     20200   20.7900  143.9500       9.7        89       918        98
VIS    2025250     20200   20.8000  143.9300      10.3        97       920        94
VIS    2025250     20200   20.8000  143.9100      10.4        94       924        90
VIS    2025250     20200   20.7700  143.2600      10.7        73       975        96
VIS    2025250     20200   20.7700  143.2500      10.4        76       972        97
VIS    2025250     20200   20.7800  143.2200      10.0        78       944        97
VIS    2025250     20200   20.7800  143.2000       9.8        76       929        95
VIS    2025250     20200   20.7900  143.1800      10.3        70       919        93
VIS    2025250     20200   20.7800  143.1600      10.0        69       907        90
VIS    2025250     20200   20.7800  143.1000       9.3        71       921        93
VIS    2025250     20200   20.7800  143.0700       9.9        69       921        92
VIS    2025250     20200   20.7800  142.9900      10.0        68       931        93
VIS    2025250     20200   20.7900  142.9700       9.6        67       919        90
VIS    2025250     20200   20.7700  142.9000       9.1        69       970        91
VIS    2025250     20200   20.7700  142.8500       9.2        73       961        92
VIS    2025250     20200   20.7700  142.8400       9.2        74       963        90
VIS    2025250     20200   20.7700  142.7700      10.5        76       942        92
VIS    2025250     20200   20.7700  142.7500      10.0        77       897        90
VIS    2025250     20200   20.7700  142.7300       9.9        77       908        93
VIS    2025250     20200   20.7900  142.6000      10.3        77       961        98
VIS    2025250     20200   20.7900  142.6000      10.3        77       961        97
VIS    2025250     20200   20.7800  142.5600      11.5        79       939        90
VIS    2025250     20200   20.7900  142.2300       9.9        74       909        90
VIS    2025250     20200   20.7700  142.1300      10.1        71       950        96
VIS    2025250     20200   20.7600  142.0100       9.9        73       984        91
VIS    2025250     20200   20.7600  141.9800      10.3        69       956        98
VIS    2025250     20200   20.7800  141.9600       9.7        74       934        93
VIS    2025250     20200   20.7800  141.9300       9.6        73       932        93
VIS    2025250     20200   20.7700  141.9000      10.0        74       963        94
VIS    2025250     20200   20.7600  141.8700      10.3        77       934        90
VIS    2025250     20200   20.7700  141.7900       9.7        76       928        91
VIS    2025250     20200   20.7800  141.7900       9.6        76       928        91
VIS    2025250     20200   20.7800  141.6900       9.3        82       961        93
VIS    2025250     20200   20.7800  141.6900       9.2        83       961        92
VIS    2025250     20200   20.7800  141.6200       9.9        87       975        93
VIS    2025250     20200   20.7800  141.6000      10.1        83       975        94
VIS    2025250     20200   20.7600  141.5700      10.9        82       940        93
VIS    2025250     20200   20.7700  141.5600      10.9        80       940        95
VIS    2025250     20200   20.7800  141.4900       9.8        90       893        92
VIS    2025250     20200   20.7800  141.4500      10.3        86       962        97
VIS    2025250     20200   20.7800  141.4400      10.5        85       962        98
VIS    2025250     20200   20.7800  141.4000      10.7        82       962        99
VIS    2025250     20200   20.7800  141.3700      10.6        83       956        99
VIS    2025250     20200   20.7600  141.3200      10.8        85       904        92
VIS    2025250     20200   20.7700  141.3000      10.7        85       904        92
VIS    2025250     20200   20.7800  141.2900      10.3        85       910        94
VIS    2025250     20200   20.7700  141.1300      10.2        86       914        93
VIS    2025250     20200   20.7700  141.1100      10.2        85       914        92
VIS    2025250     20200   20.7700  141.0800      10.4        85       925        94
VIS    2025250     20200   20.7700  141.0600      10.5        86       927        96
VIS    2025250     20200   20.7600  141.0300      11.1        85       919        94
VIS    2025250     20200   20.7700  140.9700      10.2        89       898        91
VIS    2025250     20200   20.7600  140.9500      10.1        90       893        91
VIS    2025250     20200   20.7800  140.9200      10.0        92       911        95
VIS    2025250     20200   20.7700  140.9000       9.9        92       927       100
VIS    2025250     20200   20.7700  140.8700      10.5        94       934        99
VIS    2025250     20200   20.7800  140.8000      10.0        86       908        90
VIS    2025250     20200   20.7600  140.7700      10.3        88       887        90
VIS    2025250     20200   20.7700  140.6000      10.5        83       943        98
VIS    2025250     20200   20.7800  140.5800      10.3        88       958        99
VIS    2025250     20200   20.7600  140.5500       9.8        88       975        97
VIS    2025250     20200   20.7700  140.5400       9.7        89       975        97
VIS    2025250     20200   20.7700  140.5000      10.1        82       975        96
VIS    2025250     20200   20.7600  140.4800      10.2        81       972        95
VIS    2025250     20200   20.7700  140.4600      10.0        81       967        95
VIS    2025250     20200   20.7800  146.8500       7.4        75       977        90
VIS    2025250     20200   20.7700  145.2400       9.4        63       907        91
VIS    2025250     20200   20.7800  145.2300       9.2        65       905        91
VIS    2025250     20200   20.7800  145.2000       8.6        70       902        96
VIS    2025250     20200   20.7700  145.1600       8.4        74       901        92
VIS    2025250     20200   20.7700  145.1300       7.9        74       906        97
VIS    2025250     20200   20.7700  145.1300       7.9        75       906        98
VIS    2025250     20200   20.7800  145.1000       8.1        75       906        99
VIS    2025250     20200   20.7700  145.0600       8.3        76       902        97
VIS    2025250     20200   20.7700  145.0500       8.3        75       902        97
VIS    2025250     20200   20.7700  145.0300       8.2        74       900        95
VIS    2025250     20200   20.7800  145.0100       8.2        72       897        92
VIS    2025250     20200   20.7800  144.9800       8.3        77       897        94
VIS    2025250     20200   20.7700  144.9500       8.7        79       898        97
VIS    2025250     20200   20.7800  144.9100       9.3        77       901        94
VIS    2025250     20200   20.7800  144.9000       9.3        76       901        95
VIS    2025250     20200   20.7600  144.8800       8.8        75       902        95
VIS    2025250     20200   20.7600  144.8500       8.2        76       903        97
VIS    2025250     20200   20.7700  144.8300       8.0        78       902        97
VIS    2025250     20200   20.7800  144.8000       8.1        79       901        98
VIS    2025250     20200   20.7800  144.7800       8.0        79       901        99
VIS    2025250     20200   20.7800  144.7400       8.5        78       902        91
VIS    2025250     20200   20.7800  144.6700       8.7        72       904        96
VIS    2025250     20200   20.7800  144.6400       9.2        72       904        92
VIS    2025250     20200   20.7700  144.6100       9.4        74       904        92
VIS    2025250     20200   20.7600  144.6100       9.5        72       904        90
VIS    2025250     20200   20.7700  144.5700       9.5        71       906        91
VIS    2025250     20200   20.7800  144.5400       9.2        75       906        96
VIS    2025250     20200   20.7600  144.5300       9.3        78       906        96
VIS    2025250     20200   20.7600  144.5000       9.2        83       910        97
VIS    2025250     20200   20.7600  144.4900       9.3        84       912        98
VIS    2025250     20200   20.7800  144.4400       9.6        82       913        98
VIS    2025250     20200   20.7600  144.4200       9.3        85       908        96
VIS    2025250     20200   20.7800  144.3900       9.0        82       908        97
VIS    2025250     20200   20.7600  144.3800       9.1        81       907        98
VIS    2025250     20200   20.7700  144.3600       8.9        81       908        99
VIS    2025250     20200   20.7800  144.3400       9.0        81       909        99
VIS    2025250     20200   20.7600  144.3100       9.7        74       909        96
VIS    2025250     20200   20.7600  144.2800       9.7        69       911        90
VIS    2025250     20200   20.7600  144.2400       8.6        74       915        93
VIS    2025250     20200   20.7700  144.2300       8.6        76       918        92
VIS    2025250     20200   20.7600  144.2100       8.5        79       919        99
VIS    2025250     20200   20.7600  144.1700       8.6        76       920        99
VIS    2025250     20200   20.7500  144.1400       8.5        75       920        97
VIS    2025250     20200   20.7600  144.1400       8.7        75       920        98
VIS    2025250     20200   20.7700  144.1200       8.8        78       920       100
VIS    2025250     20200   20.7600  144.0700       9.1        87       921        94
VIS    2025250     20200   20.7700  144.0500       9.3        90       922        95
VIS    2025250     20200   20.7700  144.0400       9.3        93       922        94
VIS    2025250     20200   20.7700  144.0000       8.7        83       920        95
VIS    2025250     20200   20.7700  143.9900       8.7        81       920        96
VIS    2025250     20200   20.7600  143.9600       9.6        88       917        97
VIS    2025250     20200   20.7700  143.9400       9.9        92       918        97
VIS    2025250     20200   20.7700  143.9200      10.6        93       925        91
VIS    2025250     20200   20.7500  143.3000      11.2        72       977        95
VIS    2025250     20200   20.7500  143.2900      10.6        72       977        96
VIS    2025250     20200   20.7700  143.2600      10.6        74       973        97
VIS    2025250     20200   20.7600  143.2400      10.1        77       966        98
VIS    2025250     20200   20.7500  143.2000       9.3        76       907        94
VIS    2025250     20200   20.7500  143.1900       9.2        75       904        93
VIS    2025250     20200   20.7600  143.1600       9.6        72       904        91
VIS    2025250     20200   20.7600  143.1100       9.4        72       931        97
VIS    2025250     20200   20.7700  143.1000       9.4        71       931        96
VIS    2025250     20200   20.7600  142.9700       9.5        68       935        96
VIS    2025250     20200   20.7600  142.9500      10.0        66       939        96
VIS    2025250     20200   20.7600  142.8700       9.9        70       960        97
VIS    2025250     20200   20.7600  142.7700      10.1        76       907        90
VIS    2025250     20200   20.7500  142.7500      10.0        76       885        90
VIS    2025250     20200   20.7500  142.6100      11.6        76       970        93
VIS    2025250     20200   20.7600  142.6000      10.8        78       970        98
VIS    2025250     20200   20.7500  142.5800      12.0        81       966        93
VIS    2025250     20200   20.7600  142.1600      10.7        69       955        98
VIS    2025250     20200   20.7400  142.0200       9.7        88       977        91
VIS    2025250     20200   20.7600  141.9800      10.4        69       956        97
VIS    2025250     20200   20.7500  141.9200      10.1        71       932        91
VIS    2025250     20200   20.7400  141.9000      10.7        70       963        92
VIS    2025250     20200   20.7500  141.7300      10.4        74       936        96
VIS    2025250     20200   20.7500  141.7100      10.7        79       961        97
VIS    2025250     20200   20.7500  141.6900      10.5        83       961        92
VIS    2025250     20200   20.7500  141.6700      10.0        83       961        91
VIS    2025250     20200   20.7500  141.5800      11.0        84       923        91
VIS    2025250     20200   20.7600  141.5700      11.1        82       940        94
VIS    2025250     20200   20.7400  141.5200       9.6        88       899        94
VIS    2025250     20200   20.7400  141.4900       9.4        89       943        93
VIS    2025250     20200   20.7600  141.4600      10.0        85       971        95
VIS    2025250     20200   20.7400  141.4300      10.6        80       963        94
VIS    2025250     20200   20.7600  141.4200      10.5        83       962        99
VIS    2025250     20200   20.7500  141.4000      10.5        81       956        96
VIS    2025250     20200   20.7600  141.3300      10.9        84       904        91
VIS    2025250     20200   20.7500  141.1800      10.0        88       902        91
VIS    2025250     20200   20.7400  141.1400      10.8        87       904        94
VIS    2025250     20200   20.7300  141.1300      10.9        88       904        94
VIS    2025250     20200   20.7500  141.1000      10.4        84       914        92
VIS    2025250     20200   20.7400  141.0800      10.4        85       932        98
VIS    2025250     20200   20.7500  140.9500      10.1        89       889        94
VIS    2025250     20200   20.7500  140.9300      10.1        89       893        91
VIS    2025250     20200   20.7500  140.7700      10.3        89       885        90
VIS    2025250     20200   20.7400  140.7500      10.1        89       885        90
VIS    2025250     20200   20.7300  140.6200      10.1        88       979        95
VIS    2025250     20200   20.7400  140.5700      10.6        90       983        97
VIS    2025250     20200   20.7400  140.5700      10.6        89       976        97
VIS    2025250     20200   20.7300  140.5400      10.5        90       968        96
VIS    2025250     20200   20.7400  140.5000      10.3        83       938        96
VIS    2025250     20200   20.7400  140.4900      10.4        82       938        94
VIS    2025250     20200   20.7400  140.4600      10.6        82       958        96
VIS    2025250     20200   20.7500  140.4500      10.4        82       962        97
VIS    2025250     20200   20.7500  140.3900      10.4        86       952        99
VIS    2025250     20200   20.7700  146.7800       6.9        72       979        95
VIS    2025250     20200   20.7500  145.3100       9.3        71       975        90
VIS    2025250     20200   20.7400  145.2900       9.7        70       965        93
VIS    2025250     20200   20.7600  145.2200       9.1        66       904        90
VIS    2025250     20200   20.7600  145.2000       8.7        69       902        92
VIS    2025250     20200   20.7400  145.1400       8.0        72       906        95
VIS    2025250     20200   20.7400  145.1300       8.1        71       906        97
VIS    2025250     20200   20.7400  145.1000       8.2        74       905        99
VIS    2025250     20200   20.7400  145.0600       8.4        76       903        97
VIS    2025250     20200   20.7500  145.0400       8.5        78       902        96
VIS    2025250     20200   20.7400  145.0300       8.4        79       902        96
VIS    2025250     20200   20.7400  145.0000       8.0        79       902        90
VIS    2025250     20200   20.7500  144.9600       8.4        79       901        96
VIS    2025250     20200   20.7300  144.9400       8.8        80       902        99
VIS    2025250     20200   20.7300  144.9300       8.8        80       902        99
VIS    2025250     20200   20.7500  144.8900       9.0        76       901        95
VIS    2025250     20200   20.7500  144.8800       8.7        75       903        95
VIS    2025250     20200   20.7400  144.8500       8.0        77       903        98
VIS    2025250     20200   20.7500  144.8400       7.9        78       903        97
VIS    2025250     20200   20.7300  144.8000       8.5        77       902        95
VIS    2025250     20200   20.7300  144.7700       8.8        77       902        97
VIS    2025250     20200   20.7400  144.7400       8.5        78       806        95
VIS    2025250     20200   20.7400  144.7200       8.8        74       805        91
VIS    2025250     20200   20.7300  144.6800       9.6        64       799        90
VIS    2025250     20200   20.7400  144.6600       9.1        66       800        92
VIS    2025250     20200   20.7500  144.6200       9.2        72       904        91
VIS    2025250     20200   20.7500  144.6000       9.6        70       904        90
VIS    2025250     20200   20.7500  144.5500       9.6        69       814        90
VIS    2025250     20200   20.7500  144.5200       9.3        81       906        95
VIS    2025250     20200   20.7500  144.5000       9.3        83       909        97
VIS    2025250     20200   20.7500  144.4900       9.5        85       910        98
VIS    2025250     20200   20.7300  144.4500      10.8        81       835        91
VIS    2025250     20200   20.7300  144.4200       9.6        78       821        94
VIS    2025250     20200   20.7400  144.4000       9.2        81       821        95
VIS    2025250     20200   20.7500  144.3800       9.2        80       907        98
VIS    2025250     20200   20.7300  144.3500       9.8        73       819        93
VIS    2025250     20200   20.7500  144.3300       9.6        74       907        97
VIS    2025250     20200   20.7400  144.3100       9.7        73       828        91
VIS    2025250     20200   20.7500  144.2800       9.7        71       910        93
VIS    2025250     20200   20.7400  144.2700       9.1        74       838        91
VIS    2025250     20200   20.7300  144.2400       8.1        80       871        96
VIS    2025250     20200   20.7400  144.2100       8.3        84       872        97
VIS    2025250     20200   20.7300  144.1900       8.5        85       874        98
VIS    2025250     20200   20.7400  144.1500       8.2        75       919        96
VIS    2025250     20200   20.7500  144.1400       8.4        76       919        97
VIS    2025250     20200   20.7300  144.1000       9.1        87       877        94
VIS    2025250     20200   20.7400  144.0700       9.4        86       920        95
VIS    2025250     20200   20.7300  144.0700       9.3        82       872        93
VIS    2025250     20200   20.7300  144.0400       9.2        80       869        93
VIS    2025250     20200   20.7300  144.0000       9.3        83       863        91
VIS    2025250     20200   20.7300  143.9900       9.4        83       871        92
VIS    2025250     20200   20.7500  143.9600       9.7        87       917        98
VIS    2025250     20200   20.7300  143.9300      10.2        89       917        96
VIS    2025250     20200   20.7300  143.8900       9.9        88       925        96
VIS    2025250     20200   20.7200  143.3300       9.9        72       996        96
VIS    2025250     20200   20.7200  143.3200      10.0        72       996        97
VIS    2025250     20200   20.7400  143.3000      10.5        73       981        97
VIS    2025250     20200   20.7200  143.2600      10.3        75       956        96
VIS    2025250     20200   20.7300  143.2500      10.4        74       950        97
VIS    2025250     20200   20.7200  143.2200       9.8        74       900        95
VIS    2025250     20200   20.7400  143.2000       9.1        75       904        93
VIS    2025250     20200   20.7400  143.1800       9.2        74       904        93
VIS    2025250     20200   20.7300  143.1400       9.8        73       905        96
VIS    2025250     20200   20.7400  143.0700      10.2        66       951        96
VIS    2025250     20200   20.7200  142.9000      11.1        65       976        98
VIS    2025250     20200   20.7400  142.8800      10.4        70       960        98
VIS    2025250     20200   20.7400  142.6700       9.8        78       974        93
VIS    2025250     20200   20.7400  142.6400      12.9        90       986        90
VIS    2025250     20200   20.7300  142.6000      12.2        78       966        92
VIS    2025250     20200   20.7200  142.5800      11.5        78       900        93
VIS    2025250     20200   20.7200  142.5500      10.6        80       875        92
VIS    2025250     20200   20.7300  142.5300      11.3        82       878        91
VIS    2025250     20200   20.7200  142.1500      10.8        69       991        95
VIS    2025250     20200   20.7300  142.1300      10.1        71       981        96
VIS    2025250     20200   20.7300  142.1100       9.5        72       989        93
VIS    2025250     20200   20.7100  141.9800      10.9        80       973        92
VIS    2025250     20200   20.7300  141.9500      10.4        71       956        93
VIS    2025250     20200   20.7300  141.9500      10.3        71       956        92
VIS    2025250     20200   20.7300  141.7500      10.6        73       936        97
VIS    2025250     20200   20.7100  141.7100      10.4        90       965        93
VIS    2025250     20200   20.7100  141.7000      10.8        89       895        96
VIS    2025250     20200   20.7100  141.6100      10.9        85       876        90
VIS    2025250     20200   20.7200  141.5300      10.3        87       899        95
VIS    2025250     20200   20.7200  141.5100       9.6        90       899        96
VIS    2025250     20200   20.7300  141.4600      10.2        82       983        90
VIS    2025250     20200   20.7100  141.4600      10.9        82       971        90
VIS    2025250     20200   20.7300  141.1800      10.3        88       881        92
VIS    2025250     20200   20.7200  141.1600      10.7        89       879        92
VIS    2025250     20200   20.7200  141.1400      11.0        88       879        92
VIS    2025250     20200   20.7200  141.1200      10.9        87       879        91
VIS    2025250     20200   20.7200  141.0700      10.2        91       860        90
VIS    2025250     20200   20.7100  140.8500       9.5        89       860        90
VIS    2025250     20200   20.7200  140.8100      10.0        92       861        92
VIS    2025250     20200   20.7200  140.7900      10.1        89       860        91
VIS    2025250     20200   20.7200  140.6100      10.1        88       984        95
VIS    2025250     20200   20.7100  140.5900      10.2        88       984        94
VIS    2025250     20200   20.7200  140.5100      10.6        84       919        93
VIS    2025250     20200   20.7200  140.4900      10.7        80       933        95
VIS    2025250     20200   20.7200  140.4700      10.5        81       938        98
VIS    2025250     20200   20.7300  140.4600      10.6        82       948        98
VIS    2025250     20200   20.7400  147.7100       4.6        70       991        96
VIS    2025250     20200   20.7100  145.3100       9.4        68       981        92
VIS    2025250     20200   20.7200  145.2800      10.1        72       965        95
VIS    2025250     20200   20.7100  145.2600      10.1        74       949        96
VIS    2025250     20200   20.7300  145.2400       9.8        71       926        96
VIS    2025250     20200   20.7300  145.2100       9.2        73       904        93
VIS    2025250     20200   20.7100  145.1300       8.5        72       905        91
VIS    2025250     20200   20.7200  145.1300       8.4        73       906        95
VIS    2025250     20200   20.7200  145.0900       8.4        74       905        98
VIS    2025250     20200   20.7200  145.0700       8.5        74       904        96
VIS    2025250     20200   20.7200  145.0300       8.5        81       903        95
VIS    2025250     20200   20.7200  145.0100       8.2        83       903        94
VIS    2025250     20200   20.7200  145.0000       8.2        82       903        95
VIS    2025250     20200   20.7200  144.9600       8.6        80       903        99
VIS    2025250     20200   20.7200  144.9400       8.8        80       903        99
VIS    2025250     20200   20.7300  144.9200       8.8        80       902        99
VIS    2025250     20200   20.7300  144.8800       8.8        78       901        96
VIS    2025250     20200   20.7100  144.8700       8.6        77       902        94
VIS    2025250     20200   20.7200  144.8400       8.0        76       903        98
VIS    2025250     20200   20.7100  144.8100       8.3        77       903        98
VIS    2025250     20200   20.7200  144.7900       8.7        76       902        97
VIS    2025250     20200   20.7300  144.7700       8.8        76       902        97
VIS    2025250     20200   20.7200  144.7600       8.4        81       806        99
VIS    2025250     20200   20.7100  144.7300       8.8        76       803        97
VIS    2025250     20200   20.7100  144.6800       9.6        65       802        90
VIS    2025250     20200   20.7300  144.6500       8.8        68       803        94
VIS    2025250     20200   20.7200  144.6300       8.7        69       803        94
VIS    2025250     20200   20.7100  144.5900       9.6        75       809        90
VIS    2025250     20200   20.7300  144.5700       9.9        69       813        90
VIS    2025250     20200   20.7200  144.5500       9.5        75       814        92
VIS    2025250     20200   20.7300  144.5100       9.6        81       896        93
VIS    2025250     20200   20.7300  144.5000      10.0        80       909        93
VIS    2025250     20200   20.7100  144.4400      10.7        83       835        92
VIS    2025250     20200   20.7100  144.4200      10.0        79       825        93
VIS    2025250     20200   20.7200  144.3900       9.4        74       821        91
VIS    2025250     20200   20.7100  144.3600       9.7        72       818        92
VIS    2025250     20200   20.7100  144.3500       9.8        72       821        92
VIS    2025250     20200   20.7200  144.3300       9.9        72       821        92
VIS    2025250     20200   20.7200  144.2900       9.3        78       830        92
VIS    2025250     20200   20.7100  144.2800       8.7        79       838        91
VIS    2025250     20200   20.7200  144.2400       8.1        80       871        95
VIS    2025250     20200   20.7200  144.2400       8.1        81       871        96
VIS    2025250     20200   20.7000  144.2100       9.0        87       877        97
VIS    2025250     20200   20.7100  144.1700       8.6        80       876        95
VIS    2025250     20200   20.7200  144.1500       8.0        74       877        92
VIS    2025250     20200   20.7000  144.1200       8.5        78       877        93
VIS    2025250     20200   20.7100  144.1000       8.7        82       877        92
VIS    2025250     20200   20.7200  144.0700       9.1        81       869        92
VIS    2025250     20200   20.7200  144.0600       9.0        80       869        93
VIS    2025250     20200   20.7200  144.0400       9.0        81       863        93
VIS    2025250     20200   20.7100  144.0100       9.2        81       863        91
VIS    2025250     20200   20.7100  143.9400       9.1        81       884        91
VIS    2025250     20200   20.7100  143.9300       9.3        83       898        96
VIS    2025250     20200   20.7200  143.9100      10.1        88       916        96
VIS    2025250     20200   20.7200  143.3200       9.6        72       996        96
VIS    2025250     20200   20.7100  143.3000       9.7        74       996        94
VIS    2025250     20200   20.7000  143.2700      10.1        77       956        93
VIS    2025250     20200   20.7200  143.2600      10.3        76       956        95
VIS    2025250     20200   20.7000  143.2300      10.2        72       898        93
VIS    2025250     20200   20.7000  143.2200      10.0        72       896        93
VIS    2025250     20200   20.7000  143.2000       9.4        72       896        94
VIS    2025250     20200   20.7000  143.1700       9.7        70       898        91
VIS    2025250     20200   20.7200  143.1400       9.8        73       905        96
VIS    2025250     20200   20.7000  143.1200      10.0        72       937        99
VIS    2025250     20200   20.7100  143.1000      10.5        68       952        96
VIS    2025250     20200   20.7000  142.9100      13.4        63       982        96
VIS    2025250     20200   20.7100  142.8800      12.0        76       973        90
VIS    2025250     20200   20.7100  142.8700      11.7        78       973        93
VIS    2025250     20200   20.6900  142.8500      11.5        78       962        94
VIS    2025250     20200   20.6900  142.7900      11.2        79       898        91
VIS    2025250     20200   20.7000  142.7600      10.1        80       896        97
VIS    2025250     20200   20.7100  142.3000      11.0        67       894        90
VIS    2025250     20200   20.7000  142.0100      10.7        88       960        91
VIS    2025250     20200   20.7000  141.9900      11.4        83       975        91
VIS    2025250     20200   20.6900  141.9600      10.4        79       975        94
VIS    2025250     20200   20.6900  141.9200      10.3        76       929        92
VIS    2025250     20200   20.6900  141.9000      10.3        78       963        91
VIS    2025250     20200   20.7000  141.8600      10.5        75       967        96
VIS    2025250     20200   20.6900  141.8300      10.6        78       915        95
VIS    2025250     20200   20.6900  141.7900      10.6        77       925        97
VIS    2025250     20200   20.7000  141.7700      10.0        80       894        94
VIS    2025250     20200   20.7100  141.7000      10.9        91       895        96
VIS    2025250     20200   20.7100  141.7000      10.9        90       895        96
VIS    2025250     20200   20.6900  141.6300      10.6        89       857        90
VIS    2025250     20200   20.7100  141.6100      10.9        86       867        90
VIS    2025250     20200   20.7100  141.6000      11.0        85       876        91
VIS    2025250     20200   20.6900  141.5300      10.1        94       910        99
VIS    2025250     20200   20.7000  141.2700      10.7        85       862        90
VIS    2025250     20200   20.6900  141.0700      10.2        91       856        91
VIS    2025250     20200   20.6900  140.9300      10.1        87       858        90
VIS    2025250     20200   20.6900  140.8400       9.8        90       861        92
VIS    2025250     20200   20.6800  140.5200      10.2        87       933        99
VIS    2025250     20200   20.6800  140.4900      10.5        85       933        99
VIS    2025250     20200   20.7000  140.4800      10.4        81       933        98
VIS    2025250     20200   20.6800  140.4300       9.8        88       898        90
VIS    2025250     20200   20.7300  147.8400       5.3        68       972        97
VIS    2025250     20200   20.7200  147.8000       5.2        62       939        95
VIS    2025250     20200   20.7100  145.3100       9.3        67       981        90
VIS    2025250     20200   20.7100  145.2900       9.8        70       973        95
VIS    2025250     20200   20.7100  145.2700       9.8        73       955        96
VIS    2025250     20200   20.7000  145.2500       9.8        74       948        96
VIS    2025250     20200   20.6900  145.2200       8.9        75       929        97
VIS    2025250     20200   20.7000  145.1800       9.1        73       906        91
VIS    2025250     20200   20.6900  145.1200       8.7        73       905        92
VIS    2025250     20200   20.7000  145.1000       8.6        75       905        96
VIS    2025250     20200   20.7100  145.0700       8.6        75       907        96
VIS    2025250     20200   20.7000  145.0400       8.8        78       904        97
VIS    2025250     20200   20.6900  145.0200       8.6        79       902        96
VIS    2025250     20200   20.7100  145.0000       8.3        81       902        95
VIS    2025250     20200   20.7000  144.9800       8.3        80       902        99
VIS    2025250     20200   20.7000  144.9400       8.6        80       903       100
VIS    2025250     20200   20.7000  144.9300       8.6        80       903        99
VIS    2025250     20200   20.6800  144.8900       8.6        79       903        98
VIS    2025250     20200   20.6800  144.8700       8.4        77       902        99
VIS    2025250     20200   20.7000  144.8400       8.2        76       902        99
VIS    2025250     20200   20.6900  144.8300       8.2        76       902        99
VIS    2025250     20200   20.6900  144.8000       8.7        77       902        99
VIS    2025250     20200   20.6900  144.7700       8.9        76       902        96
VIS    2025250     20200   20.6800  144.7400       9.1        73       805        95
VIS    2025250     20200   20.6800  144.7100       9.3        70       802        94
VIS    2025250     20200   20.6800  144.7100       9.3        69       802        93
VIS    2025250     20200   20.7000  144.6800       9.7        65       802        91
VIS    2025250     20200   20.6800  144.6600       9.5        71       802        91
VIS    2025250     20200   20.6800  144.6300       9.3        80       807        92
VIS    2025250     20200   20.6800  144.5900       9.7        85       809        94
VIS    2025250     20200   20.7000  144.5800       9.5        79       813        95
VIS    2025250     20200   20.6900  144.5600       9.8        75       828        92
VIS    2025250     20200   20.6900  144.5400       9.6        76       896        97
VIS    2025250     20200   20.6900  144.5100       9.6        74       932        93
VIS    2025250     20200   20.6900  144.4800      10.5        78       932        90
VIS    2025250     20200   20.6900  144.4400      10.9        81       864        92
VIS    2025250     20200   20.7000  144.4400      10.7        83       840        90
VIS    2025250     20200   20.6800  144.3600       9.6        74       838        90
VIS    2025250     20200   20.6800  144.3200       9.0        78       839        95
VIS    2025250     20200   20.6800  144.3000       8.9        79       839        94
VIS    2025250     20200   20.6800  144.2700       8.5        77       846        90
VIS    2025250     20200   20.6900  144.2500       8.4        78       846        93
VIS    2025250     20200   20.6900  144.2400       8.4        81       848        95
VIS    2025250     20200   20.6800  144.2000       8.8        85       881        98
VIS    2025250     20200   20.6900  144.1900       8.9        84       879        97
VIS    2025250     20200   20.7000  144.1500       7.9        72       882        90
VIS    2025250     20200   20.6800  144.1200       8.2        75       882        93
VIS    2025250     20200   20.6900  144.1200       8.3        76       882        94
VIS    2025250     20200   20.6800  144.0800       8.4        73       871        90
VIS    2025250     20200   20.6900  143.9400       8.5        78       887        90
VIS    2025250     20200   20.6900  143.9000       8.3        76       902        93
VIS    2025250     20200   20.6700  143.3500      10.5        65       991        92
VIS    2025250     20200   20.6800  143.3400      10.0        67       993        92
VIS    2025250     20200   20.6800  143.3000      10.0        68       969        92
VIS    2025250     20200   20.6700  143.2800      10.3        69       956        90
VIS    2025250     20200   20.6800  143.2700      10.1        73       956        93
VIS    2025250     20200   20.6800  143.2300       9.9        71       898        91
VIS    2025250     20200   20.6700  143.2200       9.9        70       898        91
VIS    2025250     20200   20.6700  143.1800       9.8        65       898        90
VIS    2025250     20200   20.6900  143.1400       9.8        73       917        97
VIS    2025250     20200   20.6900  143.1200      10.0        72       952        97
VIS    2025250     20200   20.6700  143.0900      11.7        64       970        99
VIS    2025250     20200   20.6900  142.8900      10.8        77       975        96
VIS    2025250     20200   20.6800  142.8600      10.9        77       962        97
VIS    2025250     20200   20.6900  142.8000      11.3        81       898        94
VIS    2025250     20200   20.6700  142.7600      11.0        74       959        96
VIS    2025250     20200   20.6700  142.7300      10.7        76       972        95
VIS    2025250     20200   20.6700  142.7200      10.8        78       972        90
VIS    2025250     20200   20.6700  142.6800      10.9        77       965        90
VIS    2025250     20200   20.6800  142.6600      10.9        77       965        91
VIS    2025250     20200   20.6700  142.3300      10.2        72       894        91
VIS    2025250     20200   20.6700  142.3300      10.3        70       894        90
VIS    2025250     20200   20.6600  141.9700      10.3        80       956        96
VIS    2025250     20200   20.6700  141.9600      10.4        80       960        96
VIS    2025250     20200   20.6800  141.9300      10.3        76       929        94
VIS    2025250     20200   20.6800  141.9000      10.2        78       929        92
VIS    2025250     20200   20.6600  141.8200      10.3        85       922        97
VIS    2025250     20200   20.6700  141.8000      10.3        81       925        97
VIS    2025250     20200   20.6700  141.7900      10.3        77       925        96
VIS    2025250     20200   20.6600  141.7200      10.7        93       918        97
VIS    2025250     20200   20.6700  141.7200      10.5        92       918        97
VIS    2025250     20200   20.6700  141.5900      10.9        83       864        90
VIS    2025250     20200   20.6800  141.5700      10.4        88       886        95
VIS    2025250     20200   20.6800  141.5300      10.2        93       936        97
VIS    2025250     20200   20.6700  141.5000      10.6        87       916        96
VIS    2025250     20200   20.6600  141.0900      10.2        90       854        90
VIS    2025250     20200   20.6700  141.0700      10.3        87       854        90
VIS    2025250     20200   20.6800  140.5800      10.1        86       985        94
VIS    2025250     20200   20.6700  140.5600      10.1        84       958        97
VIS    2025250     20200   20.6800  140.5200      10.3        87       958        97
VIS    2025250     20200   20.6700  140.5000      10.6        89       962        97
VIS    2025250     20200   20.6800  140.4900      10.5        86       911        94
VIS    2025250     20200   20.7100  147.8000       5.7        78       939        92
VIS    2025250     20200   20.6700  145.3000       9.2        66       970        90
VIS    2025250     20200   20.6600  145.2600       9.5        69       940        97
VIS    2025250     20200   20.6600  145.2400       9.0        69       949        96
VIS    2025250     20200   20.6600  145.2100       8.8        69       949        95
VIS    2025250     20200   20.6600  145.1800       9.2        70       919        94
VIS    2025250     20200   20.6600  145.1600       9.1        69       909        92
VIS    2025250     20200   20.6600  145.1500       9.0        69       907        91
VIS    2025250     20200   20.6700  145.1200       9.0        72       904        90
VIS    2025250     20200   20.6700  145.1000       8.7        75       902        96
VIS    2025250     20200   20.6800  145.0500       8.3        77       908        99
VIS    2025250     20200   20.6700  145.0400       8.4        76       912        99
VIS    2025250     20200   20.6700  145.0000       8.3        75       902        97
VIS    2025250     20200   20.6700  144.9900       8.3        75       902        97
VIS    2025250     20200   20.6700  144.9500       8.4        76       902        97
VIS    2025250     20200   20.6800  144.9500       8.4        77       902        97
VIS    2025250     20200   20.6600  144.9000       8.4        81       906        98
VIS    2025250     20200   20.6600  144.8900       8.5        81       906        98
VIS    2025250     20200   20.6800  144.8600       8.4        77       901        99
VIS    2025250     20200   20.6600  144.8400       8.3        78       901        99
VIS    2025250     20200   20.6600  144.8100       8.7        79       901        99
VIS    2025250     20200   20.6700  144.7800       8.9        78       902        97
VIS    2025250     20200   20.6700  144.7700       8.9        77       902        95
VIS    2025250     20200   20.6700  144.7400       9.3        68       805        91
VIS    2025250     20200   20.6800  144.7100       9.3        68       802        93
VIS    2025250     20200   20.6700  144.7000       9.4        68       802        93
VIS    2025250     20200   20.6800  144.6700       9.5        71       802        93
VIS    2025250     20200   20.6700  144.6300       9.3        79       806        92
VIS    2025250     20200   20.6700  144.6200       9.5        83       809        92
VIS    2025250     20200   20.6800  144.5900       9.8        85       809        94
VIS    2025250     20200   20.6800  144.5300      10.0        73       932        98
VIS    2025250     20200   20.6600  144.5100       9.4        72       964        91
VIS    2025250     20200   20.6700  144.4800       9.5        77       964        91
VIS    2025250     20200   20.6700  144.4700       9.8        78       964        93
VIS    2025250     20200   20.6800  144.4400      11.0        81       905        95
VIS    2025250     20200   20.6600  144.4200      11.1        82       915        93
VIS    2025250     20200   20.6600  144.3900      10.3        76       888        94
VIS    2025250     20200   20.6600  144.3800      10.2        75       856        91
VIS    2025250     20200   20.6600  144.3500       9.5        77       848        92
VIS    2025250     20200   20.6500  144.3100       9.1        78       843        94
VIS    2025250     20200   20.6500  144.2900       9.0        76       846        93
VIS    2025250     20200   20.6700  144.2700       8.6        76       846        92
VIS    2025250     20200   20.6700  144.2400       8.6        80       848        95
VIS    2025250     20200   20.6700  144.2300       8.6        82       871        97
VIS    2025250     20200   20.6500  144.1900       8.3        86       877        98
VIS    2025250     20200   20.6700  144.1700       8.4        78       881        96
VIS    2025250     20200   20.6600  144.1500       8.3        73       882        94
VIS    2025250     20200   20.6700  144.1100       8.4        75       877        92
VIS    2025250     20200   20.6700  144.0900       8.5        75       872        92
VIS    2025250     20200   20.6700  144.0800       8.4        74       872        91
VIS    2025250     20200   20.6700  143.9300       8.4        73       887        91
VIS    2025250     20200   20.6500  143.4000      10.3        64       991        90
VIS    2025250     20200   20.6600  143.3600      10.8        63       967        90
VIS    2025250     20200   20.6500  143.3500      10.9        61       965        92
VIS    2025250     20200   20.6500  143.3200      10.7        59       953        92
VIS    2025250     20200   20.6700  143.2900      10.4        67       956        90
VIS    2025250     20200   20.6500  143.2600      10.6        67       919        90
VIS    2025250     20200   20.6700  143.2200       9.9        69       898        91
VIS    2025250     20200   20.6600  143.2000      10.3        65       898        91
VIS    2025250     20200   20.6500  143.1600      10.5        65       898        90
VIS    2025250     20200   20.6700  143.1400      10.1        69       917        95
VIS    2025250     20200   20.6500  143.1100      11.0        66       950        97
VIS    2025250     20200   20.6600  143.1000      11.2        66       970        99
VIS    2025250     20200   20.6400  143.0700      11.6        64       968        97
VIS    2025250     20200   20.6400  142.8700      10.1        74       960        96
VIS    2025250     20200   20.6600  142.8600      10.2        76       950        96
VIS    2025250     20200   20.6400  142.8200      10.2        79       892        93
VIS    2025250     20200   20.6500  142.8000      10.7        78       943        97
VIS    2025250     20200   20.6600  142.7900      11.0        76       943        95
VIS    2025250     20200   20.6500  142.7500      11.0        74       966        94
VIS    2025250     20200   20.6600  142.7200      10.6        79       972        92
VIS    2025250     20200   20.6500  142.7000      10.3        78       965        90
VIS    2025250     20200   20.6400  142.6800      10.8        75       946        95
VIS    2025250     20200   20.6500  142.3500      10.0        77       894        91
VIS    2025250     20200   20.6400  142.3300      10.3        73       898        92
VIS    2025250     20200   20.6600  142.0300      10.2        89       929        98
VIS    2025250     20200   20.6400  142.0000      10.8        79       978        96
VIS    2025250     20200   20.6600  141.9800      10.2        81       960        96
VIS    2025250     20200   20.6500  141.9600      10.7        77       899        91
VIS    2025250     20200   20.6500  141.9300      10.5        76       899        90
VIS    2025250     20200   20.6600  141.8100      10.5        85       929        96
VIS    2025250     20200   20.6400  141.7400      10.7        92       918        93
VIS    2025250     20200   20.6600  141.7300      10.6        93       918        96
VIS    2025250     20200   20.6400  141.6500      10.7        88       851        90
VIS    2025250     20200   20.6400  141.6000      10.5        88       864        91
VIS    2025250     20200   20.6600  141.5600      10.0        94       910        98
VIS    2025250     20200   20.6500  141.5200      10.7        92       926        98
VIS    2025250     20200   20.6600  141.5100      10.7        90       906        95
VIS    2025250     20200   20.6600  141.4900      11.2        87       906        90
VIS    2025250     20200   20.6300  140.6000      10.6        86       991        92
VIS    2025250     20200   20.6400  140.5700      10.4        83       991        97
VIS    2025250     20200   20.6300  140.5500      10.2        82       994        95
VIS    2025250     20200   20.6400  140.5200      10.8        84       977        97
VIS    2025250     20200   20.6500  140.5100      11.0        86       977        97
VIS    2025250     20200   20.6400  140.4300      10.4        87       967        91
VIS    2025250     20200   20.6300  140.4100      10.5        87       965        94
VIS    2025250     20200   20.6500  145.3000       8.9        68       955        93
VIS    2025250     20200   20.6400  145.2800       9.3        69       939        98
VIS    2025250     20200   20.6400  145.2600       9.5        71       939        97
VIS    2025250     20200   20.6600  145.2300       9.0        70       952        96
VIS    2025250     20200   20.6400  145.2100       8.8        70       954        93
VIS    2025250     20200   20.6400  145.1800       8.8        72       926        95
VIS    2025250     20200   20.6400  145.1700       9.0        70       920        94
VIS    2025250     20200   20.6600  145.1300       9.2        70       904        93
VIS    2025250     20200   20.6500  145.1100       9.1        74       901        95
VIS    2025250     20200   20.6500  145.1000       8.6        73       901        95
VIS    2025250     20200   20.6400  145.0700       7.8        75       901        98
VIS    2025250     20200   20.6400  145.0400       7.8        76       909        99
VIS    2025250     20200   20.6500  145.0100       8.1        76       902        98
VIS    2025250     20200   20.6300  144.9900       7.9        80       901        99
VIS    2025250     20200   20.6400  144.9500       8.2        77       901        96
VIS    2025250     20200   20.6400  144.9500       8.3        77       901        95
VIS    2025250     20200   20.6300  144.9100       8.5        80       906        95
VIS    2025250     20200   20.6500  144.8900       8.5        81       906        98
VIS    2025250     20200   20.6300  144.8600       8.6        75       900        96
VIS    2025250     20200   20.6300  144.8300       8.5        75       900        97
VIS    2025250     20200   20.6400  144.8100       8.5        79       902        99
VIS    2025250     20200   20.6500  144.7900       9.0        78       903        99
VIS    2025250     20200   20.6300  144.7600       9.3        74       903        98
VIS    2025250     20200   20.6300  144.7500       9.3        70       902        95
VIS    2025250     20200   20.6500  144.6600       9.6        81       802        92
VIS    2025250     20200   20.6500  144.6400       9.5        81       806        93
VIS    2025250     20200   20.6400  144.6200       9.9        79       815        92
VIS    2025250     20200   20.6300  144.5100      10.1        75       956        91
VIS    2025250     20200   20.6300  144.5000      10.1        75       956        92
VIS    2025250     20200   20.6300  144.4600      10.0        78       951        93
VIS    2025250     20200   20.6300  144.4500      10.2        78       942        94
VIS    2025250     20200   20.6300  144.4200      10.5        82       931        95
VIS    2025250     20200   20.6400  144.3900      10.6        80       905        96
VIS    2025250     20200   20.6300  144.3600      10.1        77       882        94
VIS    2025250     20200   20.6500  144.3600       9.8        76       852        91
VIS    2025250     20200   20.6400  144.3200       9.2        77       846        94
VIS    2025250     20200   20.6500  144.2900       9.1        77       846        94
VIS    2025250     20200   20.6500  144.2800       9.0        76       846        94
VIS    2025250     20200   20.6300  144.2400       8.9        73       876        92
VIS    2025250     20200   20.6300  144.2300       8.6        77       877        95
VIS    2025250     20200   20.6500  144.2000       8.4        84       877        98
VIS    2025250     20200   20.6300  144.1700       8.9        74       877        93
VIS    2025250     20200   20.6300  144.1300       8.8        76       876        90
VIS    2025250     20200   20.6300  144.0100       9.3        74       877        90
VIS    2025250     20200   20.6300  143.9900       9.6        74       879        91
VIS    2025250     20200   20.6300  143.9700       9.4        75       876        91
VIS    2025250     20200   20.6300  143.9600       9.5        78       879        93
VIS    2025250     20200   20.6400  143.9400       9.3        79       887        92
VIS    2025250     20200   20.6300  143.3800      10.5        66       967        90
VIS    2025250     20200   20.6400  143.3500      10.8        62       965        94
VIS    2025250     20200   20.6400  143.3400      10.8        61       965        95
VIS    2025250     20200   20.6400  143.3100      10.6        60       942        90
VIS    2025250     20200   20.6400  143.1700      10.5        64       898        90
VIS    2025250     20200   20.6400  143.1400      10.6        65       948        97
VIS    2025250     20200   20.6200  143.1100      10.8        66       950        93
VIS    2025250     20200   20.6200  143.0800      10.9        69       950        93
VIS    2025250     20200   20.6400  143.0700      11.6        64       956        97
VIS    2025250     20200   20.6200  142.8800      10.4        77       943        93
VIS    2025250     20200   20.6200  142.8600      10.3        77       932        94
VIS    2025250     20200   20.6400  142.8200      10.2        78       885        91
VIS    2025250     20200   20.6400  142.7800      10.8        76       943        97
VIS    2025250     20200   20.6200  142.7600      10.8        75       959        90
VIS    2025250     20200   20.6200  142.7400      11.0        76       962        95
VIS    2025250     20200   20.6300  142.7100      10.5        76       962        96
VIS    2025250     20200   20.6300  142.7000      10.4        76       962        94
VIS    2025250     20200   20.6300  142.6800      11.0        74       932        97
VIS    2025250     20200   20.6400  142.6400      10.7        77       892        91
VIS    2025250     20200   20.6300  142.3500      10.2        78       894        93
VIS    2025250     20200   20.6400  142.3300      10.6        72       902        92
VIS    2025250     20200   20.6200  142.2700      10.7        71       953        92
VIS    2025250     20200   20.6200  142.0600      10.5        74       965        97
VIS    2025250     20200   20.6200  142.0200      11.6        83       978        93
VIS    2025250     20200   20.6300  142.0000      11.1        81       960        95
VIS    2025250     20200   20.6300  141.9900      10.8        81       944        98
VIS    2025250     20200   20.6300  141.8900      10.6        77       903        93
VIS    2025250     20200   20.6300  141.8700      10.6        77       915        96
VIS    2025250     20200   20.6100  141.8100       9.7        86       959        92
VIS    2025250     20200   20.6200  141.7800      10.2        89       966        91
VIS    2025250     20200   20.6300  141.7500      10.7        90       893        95
VIS    2025250     20200   20.6200  141.7400      11.0        90       876        93
VIS    2025250     20200   20.6200  141.6200      11.1        86       864        90
VIS    2025250     20200   20.6300  141.6000      10.6        89       868        91
VIS    2025250     20200   20.6300  141.5700      10.4        95       893        94
VIS    2025250     20200   20.6100  141.5500      11.1        94       930        98
VIS    2025250     20200   20.6100  141.5000      12.9        88       886        90
VIS    2025250     20200   20.6100  141.2900      10.6        88       867        91
VIS    2025250     20200   20.6300  141.2600      10.8        92       863        90
VIS    2025250     20200   20.6200  140.8500      10.9        81       931        98
VIS    2025250     20200   20.6300  140.8400       9.8        84       917        91
VIS    2025250     20200   20.6200  140.7000      10.2        83       985        97
VIS    2025250     20200   20.6100  140.6900      10.2        83       985        95
VIS    2025250     20200   20.6100  140.6200      10.6        89       979        92
VIS    2025250     20200   20.6100  140.6200      10.6        89       979        93
VIS    2025250     20200   20.6200  140.6000      10.7        88       982        92
VIS    2025250     20200   20.6300  140.5600      10.3        83       989        93
VIS    2025250     20200   20.6100  140.5000      10.6        81       911        92
VIS    2025250     20200   20.6100  140.4800      10.6        84       919        95
VIS    2025250     20200   20.6300  140.4700      10.4        85       911        92
VIS    2025250     20200   20.6200  140.4400      10.4        86       970        93
VIS    2025250     20200   20.6100  140.4200      10.3        85       970        95
VIS    2025250     20200   20.6100  140.4000      10.5        89       970        96
VIS    2025250     20200   20.6300  145.2800       9.4        70       947        97
VIS    2025250     20200   20.6300  145.2700       9.4        71       939        97
VIS    2025250     20200   20.6100  145.2300       9.0        72       935        97
VIS    2025250     20200   20.6100  145.2100       8.7        72       936        97
VIS    2025250     20200   20.6300  145.1800       8.7        72       926        95
VIS    2025250     20200   20.6200  145.1600       8.6        71       920        95
VIS    2025250     20200   20.6300  145.1300       9.1        71       902        93
VIS    2025250     20200   20.6100  145.1000       8.4        72       901        96
VIS    2025250     20200   20.6200  145.0900       8.3        73       900        96
VIS    2025250     20200   20.6100  145.0500       7.8        76       901        97
VIS    2025250     20200   20.6300  145.0300       7.7        77       906        98
VIS    2025250     20200   20.6100  145.0100       7.7        80       901        97
VIS    2025250     20200   20.6200  145.0000       7.8        79       901        99
VIS    2025250     20200   20.6200  144.9600       8.0        78       900        99
VIS    2025250     20200   20.6100  144.9300       8.5        79       905        94
VIS    2025250     20200   20.6200  144.9100       8.5        80       905        95
VIS    2025250     20200   20.6100  144.8900       8.7        79       902        95
VIS    2025250     20200   20.6200  144.8700       8.7        74       900        94
VIS    2025250     20200   20.6200  144.8500       8.5        75       899        95
VIS    2025250     20200   20.6100  144.8100       8.6        77       902        99
VIS    2025250     20200   20.6200  144.7900       8.8        74       904        99
VIS    2025250     20200   20.6100  144.7700       9.0        72       904        98
VIS    2025250     20200   20.6100  144.6700      10.0        79       802        90
VIS    2025250     20200   20.6300  144.6400       9.9        82       810        94
VIS    2025250     20200   20.6100  144.5100      10.2        78       942        99
VIS    2025250     20200   20.6100  144.4900      10.7        77       942        99
VIS    2025250     20200   20.6100  144.4600      10.2        77       936        97
VIS    2025250     20200   20.6200  144.4500      10.0        77       936        94
VIS    2025250     20200   20.6100  144.4100       9.9        78       913        90
VIS    2025250     20200   20.6100  144.3900       9.9        77       904        92
VIS    2025250     20200   20.6000  144.3700      10.0        73       882        91
VIS    2025250     20200   20.6100  144.3500       9.7        74       879        92
VIS    2025250     20200   20.6000  144.3300       9.5        74       864        91
VIS    2025250     20200   20.6200  144.2900       9.5        75       852        92
VIS    2025250     20200   20.6000  144.2200       8.8        72       879        92
VIS    2025250     20200   20.6100  144.1900       9.0        75       877        91
VIS    2025250     20200   20.6200  144.0200       9.0        75       881        90
VIS    2025250     20200   20.6100  143.9900       9.5        79       884        95
VIS    2025250     20200   20.6200  143.9800       9.5        77       882        93
VIS    2025250     20200   20.6200  143.9500       9.7        82       882        95
VIS    2025250     20200   20.6000  143.3800       9.9        69       965        96
VIS    2025250     20200   20.6000  143.3600      10.3        66       961        95
VIS    2025250     20200   20.6200  143.1800      10.8        65       894        90
VIS    2025250     20200   20.6200  143.1500      10.6        66       914        93
VIS    2025250     20200   20.6100  143.0900      10.9        70       950        91
VIS    2025250     20200   20.6000  143.0700      10.6        71       950        91
VIS    2025250     20200   20.6000  142.6900      10.8        74       962        98
VIS    2025250     20200   20.5900  142.4000       9.3        80       896        94
VIS    2025250     20200   20.6100  142.3700      10.4        83       896        91
VIS    2025250     20200   20.6100  142.3400       9.9        76       894        93
VIS    2025250     20200   20.5900  142.2700      11.0        72       966        94
VIS    2025250     20200   20.5900  142.2600      10.9        73       969        94
VIS    2025250     20200   20.5900  142.0700      10.2        72       975        96
VIS    2025250     20200   20.5900  142.0300      11.3        84       961        91
VIS    2025250     20200   20.6000  142.0200      11.5        84       961        95
VIS    2025250     20200   20.6000  141.9900      11.7        83       898        93
VIS    2025250     20200   20.5900  141.9300      10.1        85       883        92
VIS    2025250     20200   20.6000  141.9100      10.2        79       894        92
VIS    2025250     20200   20.6100  141.9000      10.3        79       915        95
VIS    2025250     20200   20.5900  141.8700       9.5        86       965        91
VIS    2025250     20200   20.5900  141.8500      10.0        86       959        90
VIS    2025250     20200   20.6000  141.8300       9.9        86       959        90
VIS    2025250     20200   20.5900  141.8000      10.5        89       873        93
VIS    2025250     20200   20.6000  141.6200      10.8        87       865        91
VIS    2025250     20200   20.5900  141.6000      10.2        87       870        92
VIS    2025250     20200   20.6100  141.5800      10.5        91       876        93
VIS    2025250     20200   20.6100  141.5500      11.2        93       930        99
VIS    2025250     20200   20.6000  141.5100      12.6        88       886        92
VIS    2025250     20200   20.6000  141.5100      12.9        87       886        91
VIS    2025250     20200   20.5800  141.3200      10.7        85       867        90
VIS    2025250     20200   20.5800  141.2800      10.9        91       868        92
VIS    2025250     20200   20.5800  140.8300      10.5        86       984        90
VIS    2025250     20200   20.5800  140.7300      10.3        83       977        95
VIS    2025250     20200   20.5800  140.7200      10.4        82       977        97
VIS    2025250     20200   20.5800  140.6800      10.4        82       919        94
VIS    2025250     20200   20.5800  140.6800      10.5        84       919        95
VIS    2025250     20200   20.5900  140.6300      10.5        91       973        92
VIS    2025250     20200   20.5900  140.6200      10.6        90       979        93
VIS    2025250     20200   20.6000  140.5900      11.1        88       979        94
VIS    2025250     20200   20.5800  140.5700      11.0        86       968        91
VIS    2025250     20200   20.5900  140.5600      10.9        84       968        92
VIS    2025250     20200   20.6000  140.4900      10.4        81       911        92
VIS    2025250     20200   20.5900  140.4700      10.5        82       919        94
VIS    2025250     20200   20.5900  140.4600      10.5        82       931        97
VIS    2025250     20200   20.6000  140.4200      10.5        84       958        98
VIS    2025250     20200   20.6000  140.4100      10.6        86       965        97
VIS    2025250     20200   20.6300  147.7800       5.3        60       960        95
VIS    2025250     20200   20.6000  145.3100       8.7        66       974        95
VIS    2025250     20200   20.5900  145.2600       9.6        73       947        97
VIS    2025250     20200   20.5900  145.2500       9.6        72       942        97
VIS    2025250     20200   20.6000  145.2100       8.8        70       936        98
VIS    2025250     20200   20.6000  145.1900       8.4        69       935        97
VIS    2025250     20200   20.6100  145.1700       8.3        70       922        94
VIS    2025250     20200   20.6000  145.0900       8.2        71       901        94
VIS    2025250     20200   20.6000  145.0800       8.1        72       900        93
VIS    2025250     20200   20.6000  145.0600       7.8        76       901        97
VIS    2025250     20200   20.5800  145.0200       7.6        80       901        97
VIS    2025250     20200   20.5900  145.0100       7.7        81       901        96
VIS    2025250     20200   20.6000  144.9800       8.0        78       900        99
VIS    2025250     20200   20.6000  144.9500       8.4        77       900        96
VIS    2025250     20200   20.5800  144.9200       8.8        77       905        98
VIS    2025250     20200   20.5800  144.9100       8.8        78       902        98
VIS    2025250     20200   20.5800  144.8800       8.8        79       901        97
VIS    2025250     20200   20.5900  144.8600       8.7        78       901        98
VIS    2025250     20200   20.6000  144.8200       8.7        77       902        99
VIS    2025250     20200   20.6000  144.8100       8.7        76       902        99
VIS    2025250     20200   20.5900  144.7800       8.5        73       907        99
VIS    2025250     20200   20.6000  144.7600       8.8        72       906        98
VIS    2025250     20200   20.6000  144.7300       8.6        72       813        92
VIS    2025250     20200   20.5900  144.7100       8.6        74       803        95
VIS    2025250     20200   20.6000  144.6700      10.0        79       802        90
VIS    2025250     20200   20.5900  144.6600      10.0        76       815        93
VIS    2025250     20200   20.6000  144.5200       9.8        79       926        98
VIS    2025250     20200   20.6000  144.5100      10.8        80       942        97
VIS    2025250     20200   20.6000  144.4700      10.8        78       915        96
VIS    2025250     20200   20.6000  144.4600      10.2        77       915        95
VIS    2025250     20200   20.5800  144.4300       9.9        73       913        92
VIS    2025250     20200   20.5800  144.3800       9.8        68       879        91
VIS    2025250     20200   20.5800  144.3200       9.5        74       871        90
VIS    2025250     20200   20.5900  144.2800       9.2        74       856        90
VIS    2025250     20200   20.6000  144.2200       9.1        71       881        91
VIS    2025250     20200   20.5800  144.2100       8.9        71       877        90
VIS    2025250     20200   20.5800  144.1300       9.9        80       877        90
VIS    2025250     20200   20.5800  144.1200       9.4        79       877        92
VIS    2025250     20200   20.5800  144.0300       9.6        81       884        95
VIS    2025250     20200   20.5900  144.0100       9.8        81       887        96
VIS    2025250     20200   20.5800  144.0000       9.9        79       892        95
VIS    2025250     20200   20.6000  143.9500      10.5        93       909        96
VIS    2025250     20200   20.5800  143.4000      10.3        67       984        91
VIS    2025250     20200   20.5800  143.3700      10.3        67       956        92
VIS    2025250     20200   20.5700  143.1000      11.4        72       926        90
VIS    2025250     20200   20.5700  143.0700      10.9        70       923        93
VIS    2025250     20200   20.5900  143.0600      10.9        71       950        95
VIS    2025250     20200   20.5700  143.0200      11.3        67       943        91
VIS    2025250     20200   20.5800  143.0100      11.6        65       959        91
VIS    2025250     20200   20.5700  142.6900      11.2        74       962        99
VIS    2025250     20200   20.5700  142.4200      11.1        69       903        91
VIS    2025250     20200   20.5700  142.4100      10.9        72       903        90
VIS    2025250     20200   20.5700  142.2900      11.3        66       934        91
VIS    2025250     20200   20.5800  142.2500      11.0        73       969        97
VIS    2025250     20200   20.5700  142.2500      11.0        73       969        98
VIS    2025250     20200   20.5600  142.0600      11.3        76       972        93
VIS    2025250     20200   20.5600  142.0200      11.7        77       944        97
VIS    2025250     20200   20.5700  142.0000      11.7        77       905        91
VIS    2025250     20200   20.5700  141.9900      11.5        78       893        90
VIS    2025250     20200   20.5700  141.9500       9.8        85       883        91
VIS    2025250     20200   20.5700  141.9400       9.9        87       879        93
VIS    2025250     20200   20.5800  141.8800       9.5        85       971        91
VIS    2025250     20200   20.5800  141.8600       9.8        86       959        91
VIS    2025250     20200   20.5800  141.8100      11.0        88       870        92
VIS    2025250     20200   20.5800  141.6500      10.8        85       865        90
VIS    2025250     20200   20.5700  141.6100      10.1        88       867        92
VIS    2025250     20200   20.5800  141.6000      10.1        88       870        92
VIS    2025250     20200   20.5800  141.5600      11.1        90       906        98
VIS    2025250     20200   20.5700  141.5300      12.1        91       873        92
VIS    2025250     20200   20.5800  141.5200      12.8        89       873        90
VIS    2025250     20200   20.5800  141.3200      10.7        84       867        90
VIS    2025250     20200   20.5800  141.2900      10.8        90       868        93
VIS    2025250     20200   20.5700  141.2800      10.8        91       870        93
VIS    2025250     20200   20.5800  140.9000       8.9        86       960        90
VIS    2025250     20200   20.5700  140.8500       9.8        88       970        90
VIS    2025250     20200   20.5700  140.8400      10.4        87       970        93
VIS    2025250     20200   20.5800  140.8200      10.6        86       970        90
VIS    2025250     20200   20.5700  140.7700      10.8        83       960        90
VIS    2025250     20200   20.5800  140.7300      10.4        83       977        95
VIS    2025250     20200   20.5700  140.7100      10.5        82       977        97
VIS    2025250     20200   20.5700  140.6900      10.5        81       919        94
VIS    2025250     20200   20.5700  140.6700      10.6        85       919        96
VIS    2025250     20200   20.5700  140.6400      10.6        91       965        95
VIS    2025250     20200   20.5600  140.6100      11.0        88       965        95
VIS    2025250     20200   20.5600  140.5900      11.2        86       953        98
VIS    2025250     20200   20.5800  140.5700      11.1        87       968        94
VIS    2025250     20200   20.5800  140.4200      10.8        84       919        96
VIS    2025250     20200   20.5600  140.3900      10.5        89       875        90
VIS    2025250     20200   20.5800  145.3000       9.7        73       974        95
VIS    2025250     20200   20.5700  145.2700       9.7        78       963        90
VIS    2025250     20200   20.5800  145.2500       9.5        72       942        96
VIS    2025250     20200   20.5800  145.2200       9.3        65       936        97
VIS    2025250     20200   20.5600  145.2100       9.6        64       936        95
VIS    2025250     20200   20.5800  145.1700       8.2        68       906        91
VIS    2025250     20200   20.5600  145.1500       8.6        65       904        92
VIS    2025250     20200   20.5700  145.1200       8.8        65       902        90
VIS    2025250     20200   20.5800  145.0800       8.3        68       901        91
VIS    2025250     20200   20.5700  145.0600       7.9        72       901        94
VIS    2025250     20200   20.5800  145.0200       7.6        80       900        97
VIS    2025250     20200   20.5600  144.9900       8.0        74       900        94
VIS    2025250     20200   20.5600  144.9800       8.0        74       900        96
VIS    2025250     20200   20.5600  144.9500       8.4        75       903        96
VIS    2025250     20200   20.5800  144.9200       8.8        77       905        98
VIS    2025250     20200   20.5700  144.8900       8.8        78       901        98
VIS    2025250     20200   20.5800  144.8900       8.8        78       901        97
VIS    2025250     20200   20.5600  144.8600       9.0        78       902        97
VIS    2025250     20200   20.5700  144.8300       8.7        78       902        98
VIS    2025250     20200   20.5600  144.8100       8.6        77       904        98
VIS    2025250     20200   20.5600  144.7900       8.5        76       907        98
VIS    2025250     20200   20.5800  144.7500       8.4        75       906        99
VIS    2025250     20200   20.5600  144.7200       8.8        78       807        97
VIS    2025250     20200   20.5600  144.7100       8.7        78       807        97
VIS    2025250     20200   20.5800  144.6900       9.1        77       807        95
VIS    2025250     20200   20.5600  144.6500      10.3        75       848        91
VIS    2025250     20200   20.5600  144.6400      10.5        76       848        91
VIS    2025250     20200   20.5600  144.5200       9.3        76       982        98
VIS    2025250     20200   20.5500  144.5000       9.7        75       976        97
VIS    2025250     20200   20.5600  144.4800       9.9        75       970        98
VIS    2025250     20200   20.5700  144.4600      10.6        77       938        98
VIS    2025250     20200   20.5700  144.4300      10.0        71       904        90
VIS    2025250     20200   20.5700  144.4200      10.1        69       904        90
VIS    2025250     20200   20.5700  144.3900       9.9        66       882        92
VIS    2025250     20200   20.5700  144.3700       9.8        65       882        91
VIS    2025250     20200   20.5500  144.3400       9.7        66       879        91
VIS    2025250     20200   20.5500  144.2600       9.1        73       871        94
VIS    2025250     20200   20.5700  144.2400       9.2        76       876        92
VIS    2025250     20200   20.5600  144.2000       9.8        78       877        90
VIS    2025250     20200   20.5700  144.1300       9.9        79       877        90
VIS    2025250     20200   20.5600  144.1000       9.6        74       877        90
VIS    2025250     20200   20.5700  144.0900       9.5        73       879        91
VIS    2025250     20200   20.5700  144.0700       9.2        72       882        91
VIS    2025250     20200   20.5600  144.0400       9.5        76       882        91
VIS    2025250     20200   20.5500  144.0100      10.0        72       884        91
VIS    2025250     20200   20.5700  143.9900      10.0        78       900        95
VIS    2025250     20200   20.5700  143.3700      10.5        67       956        91
VIS    2025250     20200   20.5500  143.0900      10.8        70       898        90
VIS    2025250     20200   20.5500  142.9400      11.1        74       960        91
VIS    2025250     20200   20.5400  142.9100      10.7        70       950        93
VIS    2025250     20200   20.5500  142.9000      10.5        70       964        93
VIS    2025250     20200   20.5500  142.6900      11.1        67       913        92
VIS    2025250     20200   20.5600  142.6600      11.0        73       935        95
VIS    2025250     20200   20.5400  142.4100      11.9        65       956        98
VIS    2025250     20200   20.5500  142.0600      11.7        75       966        96
VIS    2025250     20200   20.5400  142.0500      11.7        77       959        94
VIS    2025250     20200   20.5600  142.0300      11.7        76       944        98
VIS    2025250     20200   20.5600  141.9900      11.1        77       905        93
VIS    2025250     20200   20.5600  141.9700      10.5        79       893        92
VIS    2025250     20200   20.5600  141.9600       9.8        82       883        91
VIS    2025250     20200   20.5500  141.8600      10.5        85       873        90
VIS    2025250     20200   20.5400  141.7900      11.1        87       870        91
VIS    2025250     20200   20.5400  141.6200       9.9        87       857        90
VIS    2025250     20200   20.5400  141.6000      10.3        86       867        90
VIS    2025250     20200   20.5400  141.5700      11.3        86       867        90
VIS    2025250     20200   20.5300  141.2700      10.5        89       886        90
VIS    2025250     20200   20.5400  140.8700      10.3        90       969        91
VIS    2025250     20200   20.5500  140.8500       9.9        90       970        90
VIS    2025250     20200   20.5300  140.7700      11.0        89       899        95
VIS    2025250     20200   20.5400  140.7500      11.0        85       960        97
VIS    2025250     20200   20.5500  140.6700      11.1        86       892        90
VIS    2025250     20200   20.5300  140.6500      11.0        89       938        98
VIS    2025250     20200   20.5400  140.6200      10.9        86       962        95
VIS    2025250     20200   20.5400  140.6100      11.0        84       953        97
VIS    2025250     20200   20.5500  140.5800      11.0        84       919        95
VIS    2025250     20200   20.5500  140.5500      10.6        81       905        91
VIS    2025250     20200   20.5400  140.4000      10.4        90       872        90
VIS    2025250     20200   20.5900  149.3400       4.2        57       943        96
VIS    2025250     20200   20.5500  145.1800       9.4        66       911        93
VIS    2025250     20200   20.5400  145.1700       9.4        66       911        94
VIS    2025250     20200   20.5500  145.1500       9.1        65       905        93
VIS    2025250     20200   20.5300  145.0300       8.0        77       901        97
VIS    2025250     20200   20.5400  145.0200       7.9        77       901        96
VIS    2025250     20200   20.5300  144.9800       8.5        69       904        96
VIS    2025250     20200   20.5500  144.9700       8.3        73       903        96
VIS    2025250     20200   20.5500  144.9500       8.4        75       903        97
VIS    2025250     20200   20.5300  144.9200       8.4        76       903        99
VIS    2025250     20200   20.5500  144.8900       9.0        77       901        99
VIS    2025250     20200   20.5500  144.8600       9.1        76       902        96
VIS    2025250     20200   20.5400  144.8300       8.4        76       903        97
VIS    2025250     20200   20.5500  144.8100       8.5        77       904        97
VIS    2025250     20200   20.5300  144.7900       9.0        77       909        98
VIS    2025250     20200   20.5400  144.7800       8.8        76       907        96
VIS    2025250     20200   20.5300  144.7400       9.0        81       902        94
VIS    2025250     20200   20.5300  144.7200       9.1        82       832        93
VIS    2025250     20200   20.5400  144.7000       8.4        79       836        95
VIS    2025250     20200   20.5400  144.6700       9.0        75       836        94
VIS    2025250     20200   20.5500  144.6400      10.6        76       848        91
VIS    2025250     20200   20.5300  144.6300      10.1        77       931        99
VIS    2025250     20200   20.5300  144.5900       8.5        81       970        92
VIS    2025250     20200   20.5300  144.5600       9.2        81       930        96
VIS    2025250     20200   20.5300  144.5600       9.3        81       930        95
VIS    2025250     20200   20.5300  144.5300      10.3        80       943        98
VIS    2025250     20200   20.5300  144.5000       9.2        75       980        96
VIS    2025250     20200   20.5300  144.4600       9.0        67       938        97
VIS    2025250     20200   20.5300  144.4500       9.2        66       938        97
VIS    2025250     20200   20.5500  144.4100       9.9        62       904        93
VIS    2025250     20200   20.5500  144.4100      10.0        61       891        91
VIS    2025250     20200   20.5500  144.3800      10.0        62       885        90
VIS    2025250     20200   20.5500  144.3400       9.7        66       879        92
VIS    2025250     20200   20.5500  144.3300       9.7        66       871        91
VIS    2025250     20200   20.5500  144.2700       9.4        71       864        92
VIS    2025250     20200   20.5400  144.2600       9.3        73       871        93
VIS    2025250     20200   20.5500  144.2200       9.4        83       881        96
VIS    2025250     20200   20.5300  144.2000       9.9        81       882        94
VIS    2025250     20200   20.5400  144.1700      10.4        76       879        92
VIS    2025250     20200   20.5400  144.1600      10.6        76       879        92
VIS    2025250     20200   20.5500  144.1400      10.3        73       879        90
VIS    2025250     20200   20.5300  144.0800       8.6        74       879        92
VIS    2025250     20200   20.5300  144.0600       8.8        74       881        92
VIS    2025250     20200   20.5400  144.0200      10.0        71       884        91
VIS    2025250     20200   20.5400  144.0000      10.3        71       898        91
VIS    2025250     20200   20.5300  143.4200      11.1        63       982        92
VIS    2025250     20200   20.5300  143.4000      11.1        61       982        93
VIS    2025250     20200   20.5400  143.3700      10.9        62       937        91
VIS    2025250     20200   20.5300  143.0600      11.4        74       898        92
VIS    2025250     20200   20.5300  143.0600      11.3        73       898        91
VIS    2025250     20200   20.5200  142.9800      10.9        69       960        95
VIS    2025250     20200   20.5300  142.9300      10.7        71       943        96
VIS    2025250     20200   20.5200  142.7200      10.3        67       977        97
VIS    2025250     20200   20.5200  142.7000       9.9        75       977        95
VIS    2025250     20200   20.5300  142.6700      11.2        70       961        94
VIS    2025250     20200   20.5100  142.0700      11.3        77       966        92
VIS    2025250     20200   20.5100  142.0100      11.2        79       925        96
VIS    2025250     20200   20.5200  141.9900      11.1        78       961        97
VIS    2025250     20200   20.5200  141.9500       9.7        78       966        94
VIS    2025250     20200   20.5100  141.8800      11.2        95       865        93
VIS    2025250     20200   20.5200  141.8600      11.4        93       865        92
VIS    2025250     20200   20.5100  141.8300      11.4        98       873        96
VIS    2025250     20200   20.5100  141.8200      11.1        97       875        97
VIS    2025250     20200   20.5300  141.8000      10.8        90       872        93
VIS    2025250     20200   20.5200  141.6600      10.4        88       856        91
VIS    2025250     20200   20.5200  141.6400      10.6        88       856        91
VIS    2025250     20200   20.5300  141.6200      10.2        87       857        90
VIS    2025250     20200   20.5300  141.5900      10.9        87       861        90
VIS    2025250     20200   20.5200  141.5700      11.3        87       861        90
VIS    2025250     20200   20.5200  141.5400      11.8        89       859        90
VIS    2025250     20200   20.5100  141.1900      10.2        82       885        91
VIS    2025250     20200   20.5300  140.8800      10.5        89       969        91
VIS    2025250     20200   20.5200  140.8600      11.2        90       881        90
VIS    2025250     20200   20.5100  140.7900      11.4        93       891        93
VIS    2025250     20200   20.5100  140.7700      11.3        93       895        95
VIS    2025250     20200   20.5200  140.6300      10.9        85       953        98
VIS    2025250     20200   20.5200  140.6100      11.1        82       953        99
VIS    2025250     20200   20.5200  140.6000      11.1        81       919        94
VIS    2025250     20200   20.5200  145.2400      10.1        67       954        91
VIS    2025250     20200   20.5200  145.1700       9.6        64       913        93
VIS    2025250     20200   20.5300  145.1500       9.5        65       910        95
VIS    2025250     20200   20.5200  145.1400       9.5        67       907        95
VIS    2025250     20200   20.5300  145.0500       8.2        73       901        92
VIS    2025250     20200   20.5200  145.0400       8.0        77       901        97
VIS    2025250     20200   20.5100  145.0000       8.8        69       905        92
VIS    2025250     20200   20.5200  144.9800       8.8        70       904        96
VIS    2025250     20200   20.5100  144.9600       8.8        75       905        99
VIS    2025250     20200   20.5200  144.9300       8.3        76       903        98
VIS    2025250     20200   20.5200  144.9000       8.7        75       900        99
VIS    2025250     20200   20.5100  144.8900       8.6        75       900        98
VIS    2025250     20200   20.5200  144.8500       8.5        75       902        99
VIS    2025250     20200   20.5300  144.8400       8.4        75       902        98
VIS    2025250     20200   20.5200  144.8000       9.3        78       914        98
VIS    2025250     20200   20.5100  144.7900       9.4        77       915        98
VIS    2025250     20200   20.5100  144.7500       9.0        80       905        99
VIS    2025250     20200   20.5200  144.7300       9.2        82       902        93
VIS    2025250     20200   20.5100  144.7100       8.9        83       911        98
VIS    2025250     20200   20.5300  144.6700       8.8        76       848        93
VIS    2025250     20200   20.5100  144.6500       9.2        77       882        91
VIS    2025250     20200   20.5200  144.6300       9.8        77       931        99
VIS    2025250     20200   20.5200  144.6100       9.1        77       931        99
VIS    2025250     20200   20.5300  144.5900       8.3        80       970        95
VIS    2025250     20200   20.5100  144.5600       9.6        76       913        99
VIS    2025250     20200   20.5100  144.5400      10.0        79       916        98
VIS    2025250     20200   20.5100  144.5200       9.6        79       954        98
VIS    2025250     20200   20.5000  144.5000       9.1        72       954        96
VIS    2025250     20200   20.5100  144.4700       9.1        66       932        96
VIS    2025250     20200   20.5100  144.4300       9.6        65       891        93
VIS    2025250     20200   20.5100  144.4200       9.7        65       888        92
VIS    2025250     20200   20.5100  144.3300       9.6        69       856        91
VIS    2025250     20200   20.5200  144.2900       9.9        67       871        90
VIS    2025250     20200   20.5200  144.2700       9.3        72       871        94
VIS    2025250     20200   20.5200  144.1800      10.1        78       882        94
VIS    2025250     20200   20.5200  144.1800      10.1        77       882        94
VIS    2025250     20200   20.5000  144.1200       9.4        71       882        90
VIS    2025250     20200   20.5200  144.0800       8.6        74       879        92
VIS    2025250     20200   20.5200  144.0600       9.0        75       881        92
VIS    2025250     20200   20.5200  144.0400       9.8        77       884        93
VIS    2025250     20200   20.5200  144.0300       9.9        76       894        93
VIS    2025250     20200   20.5200  144.0000       9.9        76       898        92
VIS    2025250     20200   20.5000  143.4000      11.1        55       958        95
VIS    2025250     20200   20.5000  143.4000      11.2        55       958        96
VIS    2025250     20200   20.5000  143.0000      11.5        70       952        97
VIS    2025250     20200   20.5100  142.9800      11.1        68       960        98
VIS    2025250     20200   20.5100  142.7200      10.1        66       977        97
VIS    2025250     20200   20.5100  142.7100      10.1        74       977        95
VIS    2025250     20200   20.4900  142.2000      11.5        69       972        90
VIS    2025250     20200   20.4900  142.0600      11.6        79       950        93
VIS    2025250     20200   20.4900  142.0500      11.8        79       950        92
VIS    2025250     20200   20.4900  142.0100      11.3        82       925        98
VIS    2025250     20200   20.4900  142.0000      11.1        83       939        98
VIS    2025250     20200   20.4900  141.9800      12.1        83       939        98
VIS    2025250     20200   20.5000  141.9400      12.3        83       888        92
VIS    2025250     20200   20.5000  141.9300      11.4        83       888        92
VIS    2025250     20200   20.4900  141.8900      11.2        97       870        96
VIS    2025250     20200   20.4900  141.8800      11.2        97       870        96
VIS    2025250     20200   20.5100  141.8200      11.4        96       878        97
VIS    2025250     20200   20.5100  141.7900      10.9        88       870        92
VIS    2025250     20200   20.5100  141.5600      11.4        87       859        90
VIS    2025250     20200   20.5000  141.3800      10.7        87       864        90
VIS    2025250     20200   20.4800  141.1100      10.9        97       964        90
VIS    2025250     20200   20.4800  141.0200      11.0        88       931        96
VIS    2025250     20200   20.4900  140.9800      10.2        89       990        92
VIS    2025250     20200   20.4800  140.9500      11.1        83       965        96
VIS    2025250     20200   20.4900  140.9300      11.1        86       965        93
VIS    2025250     20200   20.5000  140.9100      10.8        88       981        90
VIS    2025250     20200   20.5000  140.7900      11.7        89       891        91
VIS    2025250     20200   20.4900  140.6700      11.1        86       892        90
VIS    2025250     20200   20.5000  140.6300      10.9        84       949        99
VIS    2025250     20200   20.5400  149.2600       4.1        35       943        92
VIS    2025250     20200   20.4900  145.3100       9.7        68       959        93
VIS    2025250     20200   20.4900  145.2500      10.1        75       949        99
VIS    2025250     20200   20.4900  145.2300      10.0        67       948        97
VIS    2025250     20200   20.4900  145.1700       9.7        63       914        92
VIS    2025250     20200   20.5100  145.1600       9.6        67       911        96
VIS    2025250     20200   20.4900  145.1400       9.4        67       906        92
VIS    2025250     20200   20.4900  145.1100       9.0        67       902        91
VIS    2025250     20200   20.4800  145.0800       8.3        68       905        95
VIS    2025250     20200   20.4800  145.0600       8.4        69       906        96
VIS    2025250     20200   20.4800  145.0400       8.4        73       907        98
VIS    2025250     20200   20.5000  144.9900       9.0        74       905        98
VIS    2025250     20200   20.4900  144.9700       9.1        75       905        99
VIS    2025250     20200   20.4900  144.9500       8.6        74       905        98
VIS    2025250     20200   20.5000  144.9300       8.2        75       903        97
VIS    2025250     20200   20.4800  144.9000       8.5        76       901        98
VIS    2025250     20200   20.4900  144.8700       8.3        75       902        98
VIS    2025250     20200   20.5000  144.8500       8.1        74       905        98
VIS    2025250     20200   20.5000  144.8300       8.3        77       911        99
VIS    2025250     20200   20.5000  144.8000       9.5        77       916        99
VIS    2025250     20200   20.5000  144.7800       9.5        75       908        96
VIS    2025250     20200   20.4900  144.7600       9.3        79       907        98
VIS    2025250     20200   20.4800  144.7400       9.0        80       908       100
VIS    2025250     20200   20.5000  144.7100       8.9        83       911        99
VIS    2025250     20200   20.4800  144.6800       8.4        81       917        92
VIS    2025250     20200   20.5000  144.6500       9.0        77       882        91
VIS    2025250     20200   20.4800  144.6400       8.6        74       897        98
VIS    2025250     20200   20.4800  144.6200       8.7        70       918        99
VIS    2025250     20200   20.4800  144.5900       8.9        66       918        97
VIS    2025250     20200   20.5000  144.5500       9.9        75       905        98
VIS    2025250     20200   20.4900  144.5400       9.9        77       909        98
VIS    2025250     20200   20.4800  144.5100       9.1        78       953        97
VIS    2025250     20200   20.5000  144.4900       9.1        73       954        95
VIS    2025250     20200   20.4800  144.4600       9.9        70       931        98
VIS    2025250     20200   20.5000  144.4300       9.8        67       888        92
VIS    2025250     20200   20.5000  144.1800       9.6        71       882        92
VIS    2025250     20200   20.4900  144.1500       9.6        72       882        91
VIS    2025250     20200   20.4800  144.1300       9.5        72       882        92
VIS    2025250     20200   20.4900  144.1200       9.4        72       882        92
VIS    2025250     20200   20.4800  144.0900       9.5        75       887        94
VIS    2025250     20200   20.4800  144.0700       9.5        76       898        96
VIS    2025250     20200   20.5000  144.0300      10.2        77       907        96
VIS    2025250     20200   20.4800  143.4400      11.1        53       977        92
VIS    2025250     20200   20.4700  143.4100      11.4        55       962        97
VIS    2025250     20200   20.4900  143.4000      11.2        55       958        96
VIS    2025250     20200   20.4700  143.0100      11.4        69       908        90
VIS    2025250     20200   20.4700  143.0000      11.1        69       903        91
VIS    2025250     20200   20.4700  142.9800      10.8        66       903        90
VIS    2025250     20200   20.4700  142.2300      11.6        69       972        92
VIS    2025250     20200   20.4800  142.2000      11.5        70       972        91
VIS    2025250     20200   20.4600  142.0800      12.1        77       939        94
VIS    2025250     20200   20.4800  142.0600      11.5        79       911        91
VIS    2025250     20200   20.4600  142.0000      11.0        79       939        97
VIS    2025250     20200   20.4600  141.9900      11.2        80       939        97
VIS    2025250     20200   20.4800  141.9500      12.9        84       896        92
VIS    2025250     20200   20.4800  141.9500      12.9        85       890        90
VIS    2025250     20200   20.4800  141.8900      11.4        96       876        96
VIS    2025250     20200   20.4800  141.8200      12.4        87       889        93
VIS    2025250     20200   20.4700  141.3200      10.1        85       897        95
VIS    2025250     20200   20.4800  141.3100      10.2        81       897        93
VIS    2025250     20200   20.4800  141.2400      10.3        82       977        90
VIS    2025250     20200   20.4800  141.2400      10.4        83       977        90
VIS    2025250     20200   20.4700  141.0500      10.6        92       960        90
VIS    2025250     20200   20.4800  141.0200      11.1        89       931        97
VIS    2025250     20200   20.4600  140.9900      11.4        85       931        97
VIS    2025250     20200   20.4800  140.9500      11.1        81       965        95
VIS    2025250     20200   20.4600  140.6500      11.8        82       954        98
VIS    2025250     20200   20.4600  140.6400      12.2        83       914        90
VIS    2025250     20200   20.4600  145.2900      10.2        75       959        90
VIS    2025250     20200   20.4800  145.2400       9.9        73       941        97
VIS    2025250     20200   20.4800  145.2300      10.1        69       941        99
VIS    2025250     20200   20.4800  145.1700       9.8        63       914        92
VIS    2025250     20200   20.4800  145.1600       9.6        63       914        92
VIS    2025250     20200   20.4600  145.0700       8.5        66       910        93
VIS    2025250     20200   20.4700  145.0600       8.5        68       909        94
VIS    2025250     20200   20.4600  145.0200       8.6        76       907        98
VIS    2025250     20200   20.4600  145.0100       8.7        77       907        98
VIS    2025250     20200   20.4700  144.9900       8.9        76       905        98
VIS    2025250     20200   20.4700  144.9500       8.4        73       905        97
VIS    2025250     20200   20.4700  144.9400       8.1        71       905        94
VIS    2025250     20200   20.4800  144.9000       8.5        77       901        98
VIS    2025250     20200   20.4800  144.8900       8.5        78       901        98
VIS    2025250     20200   20.4700  144.8600       8.4        77       905        98
VIS    2025250     20200   20.4700  144.8300       8.3        75       913        94
VIS    2025250     20200   20.4700  144.8100       8.6        79       915        98
VIS    2025250     20200   20.4600  144.7800      10.2        84       908        96
VIS    2025250     20200   20.4700  144.6800       8.3        80       944        91
VIS    2025250     20200   20.4800  144.6400       8.5        75       897        98
VIS    2025250     20200   20.4800  144.6200       8.7        69       921        99
VIS    2025250     20200   20.4800  144.5900       8.9        65       918        97
VIS    2025250     20200   20.4700  144.5700       9.4        65       888        93
VIS    2025250     20200   20.4500  144.5300       8.8        76       888        96
VIS    2025250     20200   20.4700  144.4800       9.3        72       956        98
VIS    2025250     20200   20.4700  144.4600      10.0        71       932        99
VIS    2025250     20200   20.4700  144.4300      10.1        69       885        93
VIS    2025250     20200   20.4600  144.4200      10.0        68       882        92
VIS    2025250     20200   20.4700  144.1300       9.8        71       882        92
VIS    2025250     20200   20.4600  144.1300       9.9        72       882        92
VIS    2025250     20200   20.4600  144.1000       9.9        78       887        95
VIS    2025250     20200   20.4700  144.0500       9.6        72       911        97
VIS    2025250     20200   20.4600  144.0100       9.7        64       949        93
VIS    2025250     20200   20.4700  143.4100      11.5        57       969        98
VIS    2025250     20200   20.4600  143.3900      12.0        59       958        97
VIS    2025250     20200   20.4500  143.0600      10.9        66       914        91
VIS    2025250     20200   20.4500  143.0300      11.1        68       911        94
VIS    2025250     20200   20.4500  143.0200      11.1        68       911        94
VIS    2025250     20200   20.4400  142.1900      10.8        78       929        92
VIS    2025250     20200   20.4400  142.1900      10.9        77       939        91
VIS    2025250     20200   20.4600  142.0000      11.1        78       939        95
VIS    2025250     20200   20.4500  141.9900      11.4        77       939        90
VIS    2025250     20200   20.4400  141.9500      11.6        79       898        91
VIS    2025250     20200   20.4400  141.9300      11.6        80       896        93
VIS    2025250     20200   20.4400  141.8900      12.1        83       896        93
VIS    2025250     20200   20.4400  141.8500      12.3        84       901        94
VIS    2025250     20200   20.4500  141.7700      11.6        81       872        90
VIS    2025250     20200   20.4400  141.3600      10.4        91       885        96
VIS    2025250     20200   20.4500  141.3200      10.3        90       960        94
VIS    2025250     20200   20.4300  141.2900      10.6        94       964        91
VIS    2025250     20200   20.4300  141.1800      10.7        90       913        90
VIS    2025250     20200   20.4300  141.1600      10.7        90       908        94
VIS    2025250     20200   20.4300  141.1200      11.2        87       908        94
VIS    2025250     20200   20.4500  141.1100      11.1        92       885        90
VIS    2025250     20200   20.4500  141.0300      11.3        92       897        94
VIS    2025250     20200   20.4300  141.0000      11.5        86       897        92
VIS    2025250     20200   20.4500  140.9900      11.4        84       918        91
VIS    2025250     20200   20.4400  140.7600      11.0        92       874        90
VIS    2025250     20200   20.4500  140.7100      11.0        89       892        90
VIS    2025250     20200   20.4500  140.6900      10.9        87       906        92
VIS    2025250     20200   20.4500  145.2700      10.0        68       949        92
VIS    2025250     20200   20.4400  145.2500       9.1        70       962        97
VIS    2025250     20200   20.4500  145.2000      10.4        68       948        94
VIS    2025250     20200   20.4400  145.1800      10.2        65       940        92
VIS    2025250     20200   20.4500  145.1600      10.0        64       918        90
VIS    2025250     20200   20.4500  145.0700       8.6        67       910        93
VIS    2025250     20200   20.4500  145.0300       8.6        71       907        97
VIS    2025250     20200   20.4400  145.0200       8.4        73       907        98
VIS    2025250     20200   20.4400  144.9900       8.4        77       907       100
VIS    2025250     20200   20.4300  144.9500       7.9        77       909        98
VIS    2025250     20200   20.4400  144.9500       8.0        77       907        98
VIS    2025250     20200   20.4400  144.9100       8.2        78       903        97
VIS    2025250     20200   20.4400  144.9000       8.4        78       902        99
VIS    2025250     20200   20.4400  144.8600       8.3        83       913        97
VIS    2025250     20200   20.4300  144.8300       8.3        80       913        94
VIS    2025250     20200   20.4400  144.8300       8.3        79       913        94
VIS    2025250     20200   20.4300  144.8000       9.3        84       909        98
VIS    2025250     20200   20.4300  144.7800      10.1        84       911        97
VIS    2025250     20200   20.4400  144.6100       9.6        71       969        97
VIS    2025250     20200   20.4400  144.5900       9.7        68       925        97
VIS    2025250     20200   20.4300  144.5800       9.4        66       922        97
VIS    2025250     20200   20.4500  144.4900       9.0        74       956        98
VIS    2025250     20200   20.4400  144.4700      10.1        68       956       100
VIS    2025250     20200   20.4500  144.4400      10.6        68       901        94
VIS    2025250     20200   20.4400  144.4300      10.4        67       901        93
VIS    2025250     20200   20.4300  144.1200      10.5        83       897        95
VIS    2025250     20200   20.4300  144.1100      10.3        84       900        96
VIS    2025250     20200   20.4400  144.0900       9.7        80       900        97
VIS    2025250     20200   20.4400  144.0300       8.9        70       927        96
VIS    2025250     20200   20.4500  144.0100       9.6        64       952        95
VIS    2025250     20200   20.4400  143.4100      12.6        60       973        99
VIS    2025250     20200   20.4300  143.3800      12.9        61       937        91
VIS    2025250     20200   20.4200  143.2700      10.1        72       894        91
VIS    2025250     20200   20.4300  143.2500       9.6        75       900        90
VIS    2025250     20200   20.4200  143.2300      10.4        70       900        92
VIS    2025250     20200   20.4300  143.0600      11.1        65       937        92
VIS    2025250     20200   20.4400  143.0100      10.9        66       920        93
VIS    2025250     20200   20.4200  142.2700      14.7        69       953        96
VIS    2025250     20200   20.4200  142.2300      11.6        78       915        91
VIS    2025250     20200   20.4300  142.1800      10.8        79       929        91
VIS    2025250     20200   20.4100  142.0600      10.9        95       903        95
VIS    2025250     20200   20.4200  142.0500      10.7        92       939        94
VIS    2025250     20200   20.4200  142.0200      11.3        87       921        99
VIS    2025250     20200   20.4300  141.9400      11.6        79       896        92
VIS    2025250     20200   20.4300  141.9200      11.6        80       899        93
VIS    2025250     20200   20.4100  141.8900      12.5        81       915        92
VIS    2025250     20200   20.4200  141.8600      12.4        82       901        91
VIS    2025250     20200   20.4100  141.6900      11.1        94       861        93
VIS    2025250     20200   20.4300  141.3600      10.7        89       892        96
VIS    2025250     20200   20.4300  141.3400      10.3        94       920       100
VIS    2025250     20200   20.4100  141.3200      10.9        88       920        99
VIS    2025250     20200   20.4200  141.2900      10.8        91       920        99
VIS    2025250     20200   20.4100  141.2600      10.7        92       926        94
VIS    2025250     20200   20.4100  141.2000      11.8        81       913        90
VIS    2025250     20200   20.4100  141.1900      11.9        82       944        92
VIS    2025250     20200   20.4100  141.1500      11.1        83       960        97
VIS    2025250     20200   20.4100  141.1200      11.8        83       962        98
VIS    2025250     20200   20.4300  141.0200      11.4        90       874        90
VIS    2025250     20200   20.4200  140.8500      11.7        90       864        90
VIS    2025250     20200   20.4200  140.8300      11.5       101       864        93
VIS    2025250     20200   20.4100  140.8000      11.3        97       878        93
VIS    2025250     20200   20.4100  140.7300      10.8        94       892        91
VIS    2025250     20200   20.4300  146.6700       8.3        68       979        95
VIS    2025250     20200   20.4200  146.6700       8.3        68       979        95
VIS    2025250     20200   20.4200  145.2900       9.9        63       935        90
VIS    2025250     20200   20.4200  145.2800      10.0        64       937        90
VIS    2025250     20200   20.4200  145.2400       8.9        69       951        94
VIS    2025250     20200   20.4200  145.2300       8.9        70       962        91
VIS    2025250     20200   20.4300  145.1700      10.2        64       939        92
VIS    2025250     20200   20.4200  145.1600      10.2        64       939        90
VIS    2025250     20200   20.4100  145.1400      10.0        67       923        90
VIS    2025250     20200   20.4100  145.0400       8.8        66       909        91
VIS    2025250     20200   20.4300  145.0200       8.5        73       908        99
VIS    2025250     20200   20.4300  145.0100       8.5        75       908        99
VIS    2025250     20200   20.4200  144.9700       8.0        79       916        99
VIS    2025250     20200   20.4300  144.9500       7.9        78       909        98
VIS    2025250     20200   20.4200  144.9400       7.8        77       907        95
VIS    2025250     20200   20.4300  144.9000       8.3        80       903        94
VIS    2025250     20200   20.4100  144.8700       8.2        82       905        98
VIS    2025250     20200   20.4100  144.8500       8.0        79       912        96
VIS    2025250     20200   20.4200  144.8400       8.1        81       913        95
VIS    2025250     20200   20.4200  144.8100       8.8        81       909        97
VIS    2025250     20200   20.4300  144.7900      10.0        83       909        98
VIS    2025250     20200   20.4200  144.6200       9.7        78       981        97
VIS    2025250     20200   20.4000  144.5900       9.1        75       931        98
VIS    2025250     20200   20.4100  144.5700       8.9        67       925        98
VIS    2025250     20200   20.4200  144.5500       8.7        65       908        95
VIS    2025250     20200   20.4200  144.4900       9.0        71       958        96
VIS    2025250     20200   20.4200  144.4900       9.1        70       958        96
VIS    2025250     20200   20.4200  144.4600      10.2        62       953        97
VIS    2025250     20200   20.4000  144.4200       9.9        73       919        96
VIS    2025250     20200   20.4000  144.4100       9.9        74       919        95
VIS    2025250     20200   20.4100  144.3800      10.0        69       897        91
VIS    2025250     20200   20.4100  143.3900      12.6        64       969        94
VIS    2025250     20200   20.4000  143.3600      12.0        60       935        91
VIS    2025250     20200   20.4000  143.2500       9.9        71       903        94
VIS    2025250     20200   20.4100  143.2300      10.3        72       911        96
VIS    2025250     20200   20.3900  143.0400      12.1        54       950        93
VIS    2025250     20200   20.4000  142.2500      13.2        75       925        91
VIS    2025250     20200   20.4000  142.1900      11.1        81       903        90
VIS    2025250     20200   20.3900  142.1100      12.5        76       908        91
VIS    2025250     20200   20.4100  142.0900      12.4        88       963        92
VIS    2025250     20200   20.3900  142.0500      10.8       100       883        99
VIS    2025250     20200   20.3900  142.0400       9.9       101       856        97
VIS    2025250     20200   20.4100  141.9800      10.9        87       898        94
VIS    2025250     20200   20.3900  141.9300      11.2        82       956        90
VIS    2025250     20200   20.3900  141.9100      12.3        77       956        94
VIS    2025250     20200   20.4100  141.8900      12.6        81       915        92
VIS    2025250     20200   20.4000  141.3900      10.8        82       888        92
VIS    2025250     20200   20.4000  141.3800      10.7        85       892        94
VIS    2025250     20200   20.4000  141.3500      11.0        91       893        96
VIS    2025250     20200   20.4000  141.3200      11.2        88       920        99
VIS    2025250     20200   20.4000  141.3000      11.0        87       902        96
VIS    2025250     20200   20.3800  141.2800      11.6        86       885        90
VIS    2025250     20200   20.3800  141.1800      11.6        93       967        92
VIS    2025250     20200   20.4000  141.1500      11.4        82       960        98
VIS    2025250     20200   20.4000  141.1200      11.8        83       962        98
VIS    2025250     20200   20.4000  140.8300      11.4        98       874        94
VIS    2025250     20200   20.3900  140.7700      10.5        89       873        91
VIS    2025250     20200   20.4000  140.7400      10.8        93       886        91
VIS    2025250     20200   20.4100  145.3300      10.7        75       954        90
VIS    2025250     20200   20.3900  145.2800       9.5        69       931        95
VIS    2025250     20200   20.3900  145.2800       9.3        69       931        97
VIS    2025250     20200   20.4000  145.2300       8.8        71       951        96
VIS    2025250     20200   20.4000  145.2100       9.1        71       951        93
VIS    2025250     20200   20.3800  145.1700       9.9        65       933        93
VIS    2025250     20200   20.3900  145.1400      10.0        66       933        92
VIS    2025250     20200   20.4000  145.1300       9.8        67       923        90
VIS    2025250     20200   20.3900  145.1000       9.3        66       918        92
VIS    2025250     20200   20.4000  145.0100       9.1        77       913       100
VIS    2025250     20200   20.3800  145.0100       9.1        77       917        99
VIS    2025250     20200   20.4000  144.9700       8.3        77       922        98
VIS    2025250     20200   20.3800  144.9400       8.1        75       911        94
VIS    2025250     20200   20.3900  144.9300       8.0        75       908        95
VIS    2025250     20200   20.3900  144.9100       8.6        75       901        93
VIS    2025250     20200   20.3900  144.8800       8.6        78       901        97
VIS    2025250     20200   20.3800  144.8500       8.2        77       907        97
VIS    2025250     20200   20.4000  144.8300       8.4        79       909        93
VIS    2025250     20200   20.3900  144.8000       9.4        82       909        91
VIS    2025250     20200   20.3900  144.7100       8.6        90       999        92
VIS    2025250     20200   20.3800  144.6100      10.0        72       962        99
VIS    2025250     20200   20.3800  144.6000       9.8        74       951        99
VIS    2025250     20200   20.4000  144.4400      10.2        67       953        98
VIS    2025250     20200   20.3800  144.3900       9.8        67       919        93
VIS    2025250     20200   20.3800  144.3700       9.7        68       919        91
VIS    2025250     20200   20.3800  144.3500       9.7        69       912        90
VIS    2025250     20200   20.3800  144.2700       8.1        72       888        94
VIS    2025250     20200   20.3900  144.2600       8.6        70       879        93
VIS    2025250     20200   20.3700  143.3600      11.6        62       935        92
VIS    2025250     20200   20.3800  143.3600      11.6        60       926        91
VIS    2025250     20200   20.3700  143.2300      10.8        57       915        91
VIS    2025250     20200   20.3600  142.3200      12.1        79       969        91
VIS    2025250     20200   20.3700  142.2800      13.0        77       953        94
VIS    2025250     20200   20.3600  142.2600      13.4        76       953        94
VIS    2025250     20200   20.3700  142.0900      11.8        93       899        98
VIS    2025250     20200   20.3700  142.0700      11.5        99       883        97
VIS    2025250     20200   20.3800  142.0400       9.9        99       856        97
VIS    2025250     20200   20.3600  141.4000      11.1        89       878        92
VIS    2025250     20200   20.3700  141.3600      11.6        89       883        93
VIS    2025250     20200   20.3600  141.3400      11.9        86       874        90
VIS    2025250     20200   20.3700  141.1700      11.6        91       967        91
VIS    2025250     20200   20.3800  140.7600      10.7        89       873        90
VIS    2025250     20200   20.3700  145.2800       9.5        72       928        97
VIS    2025250     20200   20.3700  145.2700       9.0        75       927        98
VIS    2025250     20200   20.3800  145.2200       8.7        73       932        99
VIS    2025250     20200   20.3800  145.2000       9.3        71       932        95
VIS    2025250     20200   20.3700  145.1700       9.7        66       933        96
VIS    2025250     20200   20.3700  145.1700       9.7        66       928        95
VIS    2025250     20200   20.3600  145.1200       9.2        66       921        95
VIS    2025250     20200   20.3600  145.1100       9.2        67       921        95
VIS    2025250     20200   20.3600  145.0900       8.6        67       919        91
VIS    2025250     20200   20.3600  145.0500       8.1        68       911        92
VIS    2025250     20200   20.3700  145.0200       8.9        76       911        97
VIS    2025250     20200   20.3700  144.9800       8.5        72       919        94
VIS    2025250     20200   20.3700  144.9700       8.1        73       921        92
VIS    2025250     20200   20.3800  144.9300       8.2        76       908        96
VIS    2025250     20200   20.3800  144.9000       8.9        75       901        95
VIS    2025250     20200   20.3600  144.9000       8.9        78       901        98
VIS    2025250     20200   20.3800  144.8500       8.3        77       906        98
VIS    2025250     20200   20.3600  144.8500       8.3        78       906        97
VIS    2025250     20200   20.3600  144.8200       8.5        77       909        94
VIS    2025250     20200   20.3700  144.7900       8.9        82       913        96
VIS    2025250     20200   20.3700  144.6100      10.2        71       974        99
VIS    2025250     20200   20.3700  144.5900       9.9        72       941        98
VIS    2025250     20200   20.3500  144.4300      10.3        61       971        95
VIS    2025250     20200   20.3500  144.4200      10.2        62       973        94
VIS    2025250     20200   20.3700  144.3800       9.7        67       919        91
VIS    2025250     20200   20.3700  144.3700       9.7        68       939        92
VIS    2025250     20200   20.3700  144.3500       9.7        69       914        92
VIS    2025250     20200   20.3700  144.2800       8.1        72       891        93
VIS    2025250     20200   20.3600  143.4100      11.5        66       966        90
VIS    2025250     20200   20.3600  143.2300      10.9        57       915        91
VIS    2025250     20200   20.3400  142.3400      11.8        80       960        96
VIS    2025250     20200   20.3500  142.2900      13.1        77       953        98
VIS    2025250     20200   20.3600  142.2900      13.2        76       953        95
VIS    2025250     20200   20.3400  142.0800      11.3        90       889        91
VIS    2025250     20200   20.3400  142.0600      10.9        93       883        94
VIS    2025250     20200   20.3400  141.9700      13.0        76       944        90
VIS    2025250     20200   20.3400  141.9500      14.3        75       944        94
VIS    2025250     20200   20.3500  141.9500      13.4        81       944        93
VIS    2025250     20200   20.3600  141.7000      11.7        85       892        92
VIS    2025250     20200   20.3400  141.4100      10.9        87       877        90
VIS    2025250     20200   20.3400  141.1800      11.4        91       967        93
VIS    2025250     20200   20.3300  140.6900      11.7        81       921        90
VIS    2025250     20200   20.4000  150.1300       5.3        61       987        98
VIS    2025250     20200   20.4000  150.0500       4.7        43       978        90
VIS    2025250     20200   20.4000  150.0400       4.7        41       978        92
VIS    2025250     20200   20.3900  150.0200       4.4        48       978        95
VIS    2025250     20200   20.3400  145.2800      10.4        76       951        93
VIS    2025250     20200   20.3600  145.2600       9.4        77       927        96
VIS    2025250     20200   20.3400  145.2300       9.7        78       930        99
VIS    2025250     20200   20.3400  145.2200       9.7        78       935        96
VIS    2025250     20200   20.3400  145.1900       9.9        73       929        96
VIS    2025250     20200   20.3400  145.1700       9.9        67       923        97
VIS    2025250     20200   20.3500  145.1500       9.7        66       920        97
VIS    2025250     20200   20.3300  145.1100       9.0        65       912        94
VIS    2025250     20200   20.3400  145.1100       8.9        66       913        93
VIS    2025250     20200   20.3400  145.0600       8.2        73       905        96
VIS    2025250     20200   20.3300  145.0600       8.3        74       904        96
VIS    2025250     20200   20.3500  145.0300       8.0        72       905        94
VIS    2025250     20200   20.3500  145.0100       8.2        77       908        98
VIS    2025250     20200   20.3400  144.9700       7.7        73       912        97
VIS    2025250     20200   20.3500  144.9400       8.4        78       908        98
VIS    2025250     20200   20.3500  144.9300       8.4        80       908        98
VIS    2025250     20200   20.3500  144.9000       8.9        80       901        96
VIS    2025250     20200   20.3400  144.8800       8.8        80       904        97
VIS    2025250     20200   20.3500  144.8400       8.3        78       908        98
VIS    2025250     20200   20.3500  144.8300       8.4        77       909        97
VIS    2025250     20200   20.3400  144.8000       8.5        75       915        96
VIS    2025250     20200   20.3500  144.7900       8.6        77       917        96
VIS    2025250     20200   20.3400  144.6400       7.2        76       964        91
VIS    2025250     20200   20.3300  144.5900       9.5        74       955        97
VIS    2025250     20200   20.3300  144.5900       9.5        74       955        97
VIS    2025250     20200   20.3300  144.5600      10.0        74       932        99
VIS    2025250     20200   20.3300  144.5100       9.1        83       922        93
VIS    2025250     20200   20.3500  144.4200      10.2        60       971        93
VIS    2025250     20200   20.3400  144.4000       9.8        67       956        91
VIS    2025250     20200   20.3400  144.3900       9.7        67       956        91
VIS    2025250     20200   20.3300  144.3500       9.5        69       931        97
VIS    2025250     20200   20.3500  144.3200       8.8        69       918        92
VIS    2025250     20200   20.3400  144.2900       8.3        68       891        91
VIS    2025250     20200   20.3400  143.0200      11.7        52       963        91
VIS    2025250     20200   20.3300  142.3500      11.7        78       959        98
VIS    2025250     20200   20.3300  142.3200      11.9        77       942        98
VIS    2025250     20200   20.3300  141.9700      13.3        77       944        93
VIS    2025250     20200   20.3200  141.6600      12.7        82       890        90
VIS    2025250     20200   20.3300  141.4000      10.7        86       878        91
VIS    2025250     20200   20.3100  140.6700      13.0        80       940        94
VIS    2025250     20200   20.3100  140.6600      13.4        82       940        95
VIS    2025250     20200   20.3100  140.4900      11.6        87       903        92
VIS    2025250     20200   20.3900  150.0500       4.6        39       975        90
VIS    2025250     20200   20.3900  150.0300       4.3        42       975        93
VIS    2025250     20200   20.3100  145.3000      10.4        78       971        92
VIS    2025250     20200   20.3300  145.2800      10.3        76       951        94
VIS    2025250     20200   20.3200  145.2500      10.4        75       936        96
VIS    2025250     20200   20.3200  145.2400      10.1        76       935        99
VIS    2025250     20200   20.3100  145.2100      10.2        80       935        96
VIS    2025250     20200   20.3100  145.1800      10.1        74       929        96
VIS    2025250     20200   20.3200  145.1700      10.1        68       923        96
VIS    2025250     20200   20.3300  145.1400       9.9        65       913        94
VIS    2025250     20200   20.3300  145.1200       9.2        65       911        93
VIS    2025250     20200   20.3200  145.0900       8.6        71       906        97
VIS    2025250     20200   20.3300  145.0600       8.3        74       904        97
VIS    2025250     20200   20.3200  145.0300       8.4        69       906        90
VIS    2025250     20200   20.3200  145.0200       8.4        68       906        91
VIS    2025250     20200   20.3100  144.9800       8.4        63       905        94
VIS    2025250     20200   20.3100  144.9700       8.3        65       905        95
VIS    2025250     20200   20.3100  144.9500       8.2        73       903        98
VIS    2025250     20200   20.3200  144.9200       8.5        83       901        97
VIS    2025250     20200   20.3100  144.8800       8.8        89       905        92
VIS    2025250     20200   20.3100  144.8700       8.8        86       905        92
VIS    2025250     20200   20.3200  144.8400       8.7        77       910        97
VIS    2025250     20200   20.3100  144.8100       9.0        71       913        96
VIS    2025250     20200   20.3100  144.7900       8.6        74       917        92
VIS    2025250     20200   20.3200  144.6500       7.8        70       964        93
VIS    2025250     20200   20.3200  144.6100       8.9        67       964        94
VIS    2025250     20200   20.3200  144.5900       9.3        73       955        95
VIS    2025250     20200   20.3200  144.5700       9.4        74       940        98
VIS    2025250     20200   20.3100  144.4300       9.2        64       939        91
VIS    2025250     20200   20.3100  144.4300       9.4        63       939        91
VIS    2025250     20200   20.3000  144.3900       9.0        71       915        94
VIS    2025250     20200   20.3200  144.3700       9.5        70       931        97
VIS    2025250     20200   20.3000  143.4300      11.6        64       966        97
VIS    2025250     20200   20.3200  143.4100      11.8        63       966        95
VIS    2025250     20200   20.3100  143.3800      12.0        61       943        97
VIS    2025250     20200   20.3100  143.3500      12.0        61       942        94
VIS    2025250     20200   20.3000  143.2000      11.7        69       898        91
VIS    2025250     20200   20.3000  142.3700      11.5        72       966        96
VIS    2025250     20200   20.3100  142.3400      11.9        76       935        99
VIS    2025250     20200   20.3100  142.3300      12.1        77       935        99
VIS    2025250     20200   20.3100  142.3100      12.7        76       909        94
VIS    2025250     20200   20.2900  142.0900      13.6        75       922        90
VIS    2025250     20200   20.2900  142.0100      13.0        83       889        91
VIS    2025250     20200   20.3100  141.9900      14.0        77       911        90
VIS    2025250     20200   20.3100  141.9500      14.7        80       939        97
VIS    2025250     20200   20.2800  141.3900      11.9        90       894        91
VIS    2025250     20200   20.2900  141.3600      12.7        85       890        91
VIS    2025250     20200   20.2900  141.3400      12.4        84       885        91
VIS    2025250     20200   20.2900  141.3300      12.1        85       885        91
VIS    2025250     20200   20.3000  140.9600      12.0        85       882        90
VIS    2025250     20200   20.2800  140.7400      13.6        86       927        90
VIS    2025250     20200   20.2900  140.7000      14.2        85       954        95
VIS    2025250     20200   20.3000  140.6700      13.2        82       940        94
VIS    2025250     20200   20.3000  140.5100      12.5        83       954        99
VIS    2025250     20200   20.3400  149.8700       5.1        70       997        99
VIS    2025250     20200   20.3100  147.7600       6.2        76       989        96
VIS    2025250     20200   20.2900  145.3200      10.1        75       962        93
VIS    2025250     20200   20.2900  145.3000      10.1        76       962        94
VIS    2025250     20200   20.2900  145.2700       9.7        74       953        96
VIS    2025250     20200   20.3000  145.2600      10.1        73       948        96
VIS    2025250     20200   20.3000  145.2200      10.3        78       936        99
VIS    2025250     20200   20.3000  145.2000      10.3        80       935        95
VIS    2025250     20200   20.2900  145.1700      10.2        66       927        90
VIS    2025250     20200   20.2800  145.1200       9.7        66       907        90
VIS    2025250     20200   20.3000  145.1000       9.1        67       906        96
VIS    2025250     20200   20.2900  145.0900       8.8        69       905        96
VIS    2025250     20200   20.2800  145.0500       8.9        67       906        95
VIS    2025250     20200   20.2900  145.0400       9.1        66       906        93
VIS    2025250     20200   20.2900  144.9300       8.3        76       903        94
VIS    2025250     20200   20.2900  144.9000       8.7        88       905        97
VIS    2025250     20200   20.2800  144.8700       8.5        87       917        95
VIS    2025250     20200   20.2900  144.8600       8.6        80       913        94
VIS    2025250     20200   20.2900  144.8300       9.1        70       914        97
VIS    2025250     20200   20.3000  144.8100       9.2        69       914        94
VIS    2025250     20200   20.2900  144.6600       8.5        71       933        96
VIS    2025250     20200   20.3000  144.6300       9.5        59       964        91
VIS    2025250     20200   20.2800  144.6100      10.3        63       964        90
VIS    2025250     20200   20.3000  144.5600       9.0        72       932        98
VIS    2025250     20200   20.2800  144.4900       9.0        68       939        92
VIS    2025250     20200   20.2800  144.4300       9.0        67       928        94
VIS    2025250     20200   20.2800  144.4200       8.8        67       924        94
VIS    2025250     20200   20.3000  144.3900       8.9        71       912        95
VIS    2025250     20200   20.3000  144.3700       8.9        71       912        97
VIS    2025250     20200   20.2900  144.3400       9.3        71       914        98
VIS    2025250     20200   20.2800  144.3200       9.3        72       926        96
VIS    2025250     20200   20.2900  143.4100      11.8        67       965       100
VIS    2025250     20200   20.2700  143.3500      12.6        60       955        93
VIS    2025250     20200   20.2700  143.3100      12.2        55       951        95
VIS    2025250     20200   20.2800  143.3000      11.8        54       934        92
VIS    2025250     20200   20.2900  143.2700      11.0        56       919        91
VIS    2025250     20200   20.2800  143.2600      11.0        60       914        91
VIS    2025250     20200   20.2700  143.2300      11.5        63       908        90
VIS    2025250     20200   20.2800  142.3100      13.0        84       892        92
VIS    2025250     20200   20.2700  142.2900      13.8        85       891        90
VIS    2025250     20200   20.2700  141.9800      15.5        77       939        93
VIS    2025250     20200   20.2700  141.9500      15.3        80       922        90
VIS    2025250     20200   20.2600  141.6400      12.9        87       950        94
VIS    2025250     20200   20.2700  141.6200      13.5        84       904        91
VIS    2025250     20200   20.2700  141.5800      11.2        89       858        90
VIS    2025250     20200   20.2600  141.5500      11.2        89       860        91
VIS    2025250     20200   20.2800  141.3900      12.3        90       894        92
VIS    2025250     20200   20.2800  141.3600      12.6        86       896        91
VIS    2025250     20200   20.2700  141.3500      12.3        86       897        93
VIS    2025250     20200   20.2800  141.3300      11.5        86       897        94
VIS    2025250     20200   20.2800  141.1000      12.9        76       962        92
VIS    2025250     20200   20.2700  141.0700      12.8        84       962        95
VIS    2025250     20200   20.2600  141.0300      12.7        88       899        90
VIS    2025250     20200   20.2600  140.7800      13.4        85       949        98
VIS    2025250     20200   20.2600  140.7400      14.6        89       954        95
VIS    2025250     20200   20.2800  140.5400      13.6        83       921        91
VIS    2025250     20200   20.3000  147.6000       6.4        78       994        96
VIS    2025250     20200   20.2600  145.3100      10.8        68       953        94
VIS    2025250     20200   20.2800  145.2900      10.0        75       962        95
VIS    2025250     20200   20.2800  145.2700       9.6        74       953        96
VIS    2025250     20200   20.2800  145.2500       9.1        75       948        95
VIS    2025250     20200   20.2600  145.2100       9.0        72       949        91
VIS    2025250     20200   20.2600  145.1900       9.7        68       936        92
VIS    2025250     20200   20.2600  145.0900       9.7        69       906        95
VIS    2025250     20200   20.2600  145.0800       9.3        68       906        95
VIS    2025250     20200   20.2600  145.0600       8.9        67       906        96
VIS    2025250     20200   20.2600  145.0100       8.6        65       906        92
VIS    2025250     20200   20.2700  144.9400       8.2        72       904        90
VIS    2025250     20200   20.2600  144.9100       8.3        79       905        95
VIS    2025250     20200   20.2700  144.9100       8.4        82       905        97
VIS    2025250     20200   20.2800  144.8700       8.5        86       917        96
VIS    2025250     20200   20.2600  144.8500       8.6        78       917        93
VIS    2025250     20200   20.2700  144.7800       8.9        68       932        92
VIS    2025250     20200   20.2700  144.6700       8.6        75       922        99
VIS    2025250     20200   20.2800  144.6600       8.6        72       927        98
VIS    2025250     20200   20.2600  144.6200      10.1        64       965        94
VIS    2025250     20200   20.2700  144.6100      10.4        62       964        92
VIS    2025250     20200   20.2500  144.5900       9.4        66       957        91
VIS    2025250     20200   20.2700  144.5100       8.8        71       919        93
VIS    2025250     20200   20.2700  144.4900       9.1        68       933        94
VIS    2025250     20200   20.2600  144.4500       9.0        65       931        96
VIS    2025250     20200   20.2700  144.4400       9.1        65       929        94
VIS    2025250     20200   20.2700  144.4200       8.8        68       913        94
VIS    2025250     20200   20.2600  144.3700       8.6        74       891        98
VIS    2025250     20200   20.2700  144.3600       8.7        74       906        99
VIS    2025250     20200   20.2700  144.3400       8.8        73       909        98
VIS    2025250     20200   20.2500  143.2600      11.7        60       935        95
VIS    2025250     20200   20.2500  143.2600      11.7        61       935        95
VIS    2025250     20200   20.2500  143.2300      11.6        60       926        90
VIS    2025250     20200   20.2600  143.1900      11.9        63       926        91
VIS    2025250     20200   20.2400  143.1800      11.0        63       926        93
VIS    2025250     20200   20.2600  143.1600      11.5        66       954        97
VIS    2025250     20200   20.2400  142.3900      13.2        80       948        92
VIS    2025250     20200   20.2500  142.3600      12.8        85       935        91
VIS    2025250     20200   20.2500  142.3400      12.8        86       909        92
VIS    2025250     20200   20.2400  142.3000      14.3        87       898        94
VIS    2025250     20200   20.2400  142.2700      14.3        87       896        97
VIS    2025250     20200   20.2500  142.2700      13.5        87       893        92
VIS    2025250     20200   20.2500  142.0900      13.5        73       939        93
VIS    2025250     20200   20.2600  142.0500      12.7        79       872        91
VIS    2025250     20200   20.2400  142.0200      13.0        80       920        94
VIS    2025250     20200   20.2400  141.9800      15.4        74       966        97
VIS    2025250     20200   20.2400  141.7100      10.0        82       970        93
VIS    2025250     20200   20.2500  141.7100      10.9        80       970        94
VIS    2025250     20200   20.2300  141.6400      12.8        92       935        94
VIS    2025250     20200   20.2300  141.6300      13.1        91       904        94
VIS    2025250     20200   20.2500  141.5900      12.8        88       883        91
VIS    2025250     20200   20.2300  141.5600      12.1        89       883        96
VIS    2025250     20200   20.2400  141.3600      11.3        88       917        91
VIS    2025250     20200   20.2500  141.3200       8.2       108       919        94
VIS    2025250     20200   20.2500  141.1000      13.7        85       982        96
VIS    2025250     20200   20.2500  141.0900      13.9        86       965        95
VIS    2025250     20200   20.2300  141.0600      13.7        88       919        91
VIS    2025250     20200   20.2300  141.0300      13.4        90       908        96
VIS    2025250     20200   20.2300  141.0100      13.9        89       919        97
VIS    2025250     20200   20.2400  140.9700      14.2        86       925        95
VIS    2025250     20200   20.2300  140.9700      14.0        86       925        96
VIS    2025250     20200   20.2300  140.9300      13.6        85       895        91
VIS    2025250     20200   20.2300  140.9000      13.9        88       906        94
VIS    2025250     20200   20.2300  140.8800      13.7        87       922        97
VIS    2025250     20200   20.2300  140.8200      13.0        84       949        99
VIS    2025250     20200   20.2400  140.7900      13.2        86       949        98
VIS    2025250     20200   20.2400  140.7700      13.6        88       927        98
VIS    2025250     20200   20.2300  140.7500      14.5        90       922        94
VIS    2025250     20200   20.2800  147.5500       6.1        66       968       100
VIS    2025250     20200   20.2500  146.6500       8.4        61       981        94
VIS    2025250     20200   20.2400  145.3400       8.7        76       982        92
VIS    2025250     20200   20.2400  145.3100      10.6        70       982        95
VIS    2025250     20200   20.2400  145.2900      10.2        70       949        97
VIS    2025250     20200   20.2500  145.2700       9.4        74       943        95
VIS    2025250     20200   20.2400  145.2500       8.8        79       929        94
VIS    2025250     20200   20.2500  145.2200       9.0        74       948        93
VIS    2025250     20200   20.2500  145.1900       9.8        69       920        94
VIS    2025250     20200   20.2500  145.0900       9.7        69       904        97
VIS    2025250     20200   20.2300  145.0800       9.8        72       820        93
VIS    2025250     20200   20.2500  145.0600       9.0        68       904        96
VIS    2025250     20200   20.2400  145.0300       8.5        73       813        94
VIS    2025250     20200   20.2400  145.0000       7.7        68       819        95
VIS    2025250     20200   20.2500  144.9800       7.6        67       905        93
VIS    2025250     20200   20.2500  144.9500       7.7        75       840        91
VIS    2025250     20200   20.2400  144.9300       8.0        74       829        94
VIS    2025250     20200   20.2400  144.8900       8.6        80       908        96
VIS    2025250     20200   20.2300  144.8600       8.7        82       913        95
VIS    2025250     20200   20.2400  144.8600       8.6        81       917        93
VIS    2025250     20200   20.2400  144.8300       8.3        77       892        95
VIS    2025250     20200   20.2300  144.7800       8.9        71       924        98
VIS    2025250     20200   20.2400  144.7400       8.8        80       970        93
VIS    2025250     20200   20.2300  144.7200       8.9        83       943        93
VIS    2025250     20200   20.2300  144.7100       8.8        81       918        96
VIS    2025250     20200   20.2300  144.6700       8.5        70       901        93
VIS    2025250     20200   20.2500  144.6600       8.6        72       922        96
VIS    2025250     20200   20.2300  144.6300       8.8        70       965        90
VIS    2025250     20200   20.2500  144.5900       9.4        66       965        92
VIS    2025250     20200   20.2300  144.5200       8.4        69       884        93
VIS    2025250     20200   20.2300  144.5100       8.5        68       896        94
VIS    2025250     20200   20.2500  144.4900       8.9        68       933        94
VIS    2025250     20200   20.2400  144.4600       8.9        65       955        94
VIS    2025250     20200   20.2400  144.4200       9.3        64       894        97
VIS    2025250     20200   20.2400  144.4000       9.1        68       891        97
VIS    2025250     20200   20.2500  144.3900       9.0        69       891        98
VIS    2025250     20200   20.2300  144.3600       9.1        75       908       100
VIS    2025250     20200   20.2500  144.3400       9.0        75       915        98
VIS    2025250     20200   20.2300  143.2700      12.3        59       975        99
VIS    2025250     20200   20.2200  143.2400      12.3        56       969        93
VIS    2025250     20200   20.2200  143.1600      10.3        68       955        93
VIS    2025250     20200   20.2100  142.4300      12.4        78       971        95
VIS    2025250     20200   20.2100  142.3900      13.4        79       913        96
VIS    2025250     20200   20.2300  142.3900      13.4        80       946        94
VIS    2025250     20200   20.2200  142.3600      13.3        80       909        97
VIS    2025250     20200   20.2200  142.3300      13.1        82       906        96
VIS    2025250     20200   20.2200  142.3000      14.6        87       898        97
VIS    2025250     20200   20.2200  142.2800      14.8        87       896        96
VIS    2025250     20200   20.2100  142.2500      15.2        83       893        93
VIS    2025250     20200   20.2200  142.2300      14.7        80       893        92
VIS    2025250     20200   20.2100  142.2100      14.1        80       893        93
VIS    2025250     20200   20.2100  142.1900      13.9        77       899        93
VIS    2025250     20200   20.2200  142.1600      13.8        77       913        92
VIS    2025250     20200   20.2200  142.1400      13.2        75       963        98
VIS    2025250     20200   20.2300  142.1200      13.3        75       944        98
VIS    2025250     20200   20.2300  142.1000      13.4        75       939        93
VIS    2025250     20200   20.2300  142.0300      12.9        80       920        95
VIS    2025250     20200   20.2300  142.0000      14.2        77       961        99
VIS    2025250     20200   20.2300  141.9800      15.3        74       953        97
VIS    2025250     20200   20.2300  141.8400      12.9        79       889        90
VIS    2025250     20200   20.2300  141.7800      12.5        81       885        92
VIS    2025250     20200   20.2100  141.7500      11.1        89       945        94
VIS    2025250     20200   20.2100  141.7100      10.8        92       970        90
VIS    2025250     20200   20.2200  141.7000      10.7        90       970        90
VIS    2025250     20200   20.2300  141.6500      12.6        92       935        95
VIS    2025250     20200   20.2100  141.6200      13.2        90       889        95
VIS    2025250     20200   20.2200  141.6100      13.1        91       888        96
VIS    2025250     20200   20.2200  141.5600      12.3        91       885        97
VIS    2025250     20200   20.2200  141.5500      12.4        88       885        95
VIS    2025250     20200   20.2100  141.4300      11.9        86       927        97
VIS    2025250     20200   20.2100  141.3400       8.8       101       901        94
VIS    2025250     20200   20.2100  141.1100      13.6        85       961        99
VIS    2025250     20200   20.2200  141.1000      13.9        85       962        99
VIS    2025250     20200   20.2200  141.0400      13.5        88       908        92
VIS    2025250     20200   20.2300  141.0100      14.1        89       919        97
VIS    2025250     20200   20.2300  141.0000      14.3        88       919        96
VIS    2025250     20200   20.2100  140.9600      13.1        86       892        92
VIS    2025250     20200   20.2100  140.9500      12.0        88       877        93
VIS    2025250     20200   20.2100  140.9100      12.5        93       892        95
VIS    2025250     20200   20.2300  140.9000      13.8        88       906        94
VIS    2025250     20200   20.2300  140.8700      13.7        87       922        96
VIS    2025250     20200   20.2200  140.8400      13.0        85       946        99
VIS    2025250     20200   20.2100  140.8300      13.0        84       946        99
VIS    2025250     20200   20.2200  140.8000      13.1        86       949        98
VIS    2025250     20200   20.2200  140.7600      14.1        90       900        94
VIS    2025250     20200   20.2100  140.7500      14.4        91       897        93
VIS    2025250     20200   20.2300  140.7000      14.5        89       897        90
VIS    2025250     20200   20.2300  140.6700      14.2        87       907        91
VIS    2025250     20200   20.2300  145.3200      10.2        71       982        96
VIS    2025250     20200   20.2300  145.2900      10.2        70       949        97
VIS    2025250     20200   20.2300  145.2700       9.4        73       933        96
VIS    2025250     20200   20.2300  145.2600       9.0        75       926        95
VIS    2025250     20200   20.2100  145.2300       9.2        77       911        91
VIS    2025250     20200   20.2100  145.1900       9.7        77       869        90
VIS    2025250     20200   20.2300  145.1000      10.3        71       820        92
VIS    2025250     20200   20.2300  145.0800       9.7        73       820        94
VIS    2025250     20200   20.2200  145.0500       8.8        78       813        97
VIS    2025250     20200   20.2200  145.0400       8.7        76       813        96
VIS    2025250     20200   20.2200  145.0200       8.5        72       819        92
VIS    2025250     20200   20.2200  144.9700       7.4        71       819        95
VIS    2025250     20200   20.2200  144.9500       7.3        69       817        95
VIS    2025250     20200   20.2200  144.9400       7.5        71       817        95
VIS    2025250     20200   20.2300  144.9000       8.6        78       877        98
VIS    2025250     20200   20.2100  144.8700       8.7        82       877        97
VIS    2025250     20200   20.2100  144.8700       8.7        82       877        97
VIS    2025250     20200   20.2200  144.8400       8.3        78       854        95
VIS    2025250     20200   20.2100  144.8000       8.7        69       892        92
VIS    2025250     20200   20.2100  144.7900       8.8        69       892        94
VIS    2025250     20200   20.2100  144.7600       9.6        67       932        97
VIS    2025250     20200   20.2100  144.7400       9.0        74       949        96
VIS    2025250     20200   20.2300  144.7200       8.9        81       943        94
VIS    2025250     20200   20.2200  144.6800       8.5        70       901        91
VIS    2025250     20200   20.2300  144.6700       8.5        69       901        91
VIS    2025250     20200   20.2000  144.5800       8.6        68       941        91
VIS    2025250     20200   20.2000  144.5500       8.9        71       892        94
VIS    2025250     20200   20.2200  144.5400       8.6        70       892        90
VIS    2025250     20200   20.2200  144.5100       8.4        69       896        95
VIS    2025250     20200   20.2100  144.4800       8.5        67       951        94
VIS    2025250     20200   20.2200  144.4700       8.6        66       955        91
VIS    2025250     20200   20.2000  144.4400       9.1        67       899        94
VIS    2025250     20200   20.2000  144.4200       9.3        65       899        93
VIS    2025250     20200   20.2200  144.3900       9.7        67       899        97
VIS    2025250     20200   20.2200  144.3600       9.3        74       907       100
VIS    2025250     20200   20.2100  144.3400       9.2        71       918        97
VIS    2025250     20200   20.2100  143.2800      12.3        58       975        99
VIS    2025250     20200   20.1900  143.2600      13.7        55       984        92
VIS    2025250     20200   20.2100  143.2300      12.1        57       969        93
VIS    2025250     20200   20.2000  143.2000      11.0        60       945        96
VIS    2025250     20200   20.2000  143.1600      10.8        66       945        97
VIS    2025250     20200   20.2000  142.4500      12.5        75       971        94
VIS    2025250     20200   20.1900  142.4200      12.0        82       922        96
VIS    2025250     20200   20.2000  142.4100      12.3        82       918        96
VIS    2025250     20200   20.1900  142.3600      13.2        82       901        97
VIS    2025250     20200   20.2100  142.3500      13.4        79       906        95
VIS    2025250     20200   20.2000  142.3400      13.3        80       901        96
VIS    2025250     20200   20.2100  142.2900      14.7        86       894        96
VIS    2025250     20200   20.2000  142.2800      15.3        87       891        95
VIS    2025250     20200   20.2000  142.2500      15.2        82       891        94
VIS    2025250     20200   20.2000  142.2200      14.0        77       892        90
VIS    2025250     20200   20.2000  142.2100      14.1        75       896        91
VIS    2025250     20200   20.2100  142.1700      14.0        76       913        92
VIS    2025250     20200   20.2100  142.1600      13.9        75       913        91
VIS    2025250     20200   20.1900  142.1200      13.7        75       945        98
VIS    2025250     20200   20.2000  142.1100      13.4        74       953        98
VIS    2025250     20200   20.2000  142.0700      14.2        79       897        91
VIS    2025250     20200   20.2000  142.0300      13.7        76       932        94
VIS    2025250     20200   20.2000  142.0000      14.4        77       932        94
VIS    2025250     20200   20.2000  141.9800      14.6        76       925        92
VIS    2025250     20200   20.2000  141.9700      14.7        77       904        90
VIS    2025250     20200   20.2000  141.9400      15.1        77       895        91
VIS    2025250     20200   20.1900  141.9200      14.9        76       895        91
VIS    2025250     20200   20.2100  141.7700      12.9        84       891        96
VIS    2025250     20200   20.1900  141.7300      11.8        97       970        91
VIS    2025250     20200   20.1900  141.7200      11.5        96       970        91
VIS    2025250     20200   20.2000  141.6200      12.9        91       889        95
VIS    2025250     20200   20.2000  141.6000      12.9        94       885        98
VIS    2025250     20200   20.1900  141.5700      13.7        95       885        97
VIS    2025250     20200   20.1800  141.5300      12.6        91       897        97
VIS    2025250     20200   20.1900  141.3000      11.0       103       929        94
VIS    2025250     20200   20.1900  141.2700      13.6        80       974        95
VIS    2025250     20200   20.1900  141.2600      13.6        80       974        95
VIS    2025250     20200   20.1900  141.1400      13.0        86       971        95
VIS    2025250     20200   20.1900  141.1300      12.9        86       953        98
VIS    2025250     20200   20.2000  141.1100      13.5        85       961        99
VIS    2025250     20200   20.2000  141.0700      14.3        89       904        93
VIS    2025250     20200   20.2000  141.0600      14.1        90       904        93
VIS    2025250     20200   20.1800  141.0200      14.6        92       892        92
VIS    2025250     20200   20.1900  141.0000      14.4        88       890        91
VIS    2025250     20200   20.1900  140.9900      14.4        87       890        91
VIS    2025250     20200   20.1900  140.9700      12.9        85       877        91
VIS    2025250     20200   20.1800  140.9400      12.1        91       838        90
VIS    2025250     20200   20.1800  140.9100      12.7        95       868        92
VIS    2025250     20200   20.2000  140.8800      13.7        91       906        96
VIS    2025250     20200   20.2000  140.8600      13.2        86       911        94
VIS    2025250     20200   20.1900  140.7700      13.5        90       898        92
VIS    2025250     20200   20.2100  145.3300       9.3        75       982        92
VIS    2025250     20200   20.2100  145.3100      10.0        68       962        98
VIS    2025250     20200   20.2100  145.2900       9.9        67       949        98
VIS    2025250     20200   20.1900  145.2500       9.7        72       926        91
VIS    2025250     20200   20.1800  145.2400       9.6        77       916        93
VIS    2025250     20200   20.1800  145.1100       9.9        76       831        92
VIS    2025250     20200   20.1800  145.0900       9.9        77       825        92
VIS    2025250     20200   20.1800  145.0600       9.3        78       825        94
VIS    2025250     20200   20.1800  145.0300       8.6        78       825        95
VIS    2025250     20200   20.1800  144.9800       8.0        67       834        93
VIS    2025250     20200   20.1900  144.9700       7.7        66       834        93
VIS    2025250     20200   20.2000  144.9100       8.4        75       849        94
VIS    2025250     20200   20.2000  144.9000       8.6        77       849        94
VIS    2025250     20200   20.2000  144.8700       8.6        81       854        95
VIS    2025250     20200   20.2000  144.8500       8.4        76       854        94
VIS    2025250     20200   20.1900  144.8000       8.9        67       906        93
VIS    2025250     20200   20.1800  144.7700       9.6        63       923        98
VIS    2025250     20200   20.2000  144.7400       9.2        72       927       100
VIS    2025250     20200   20.1800  144.7300       9.2        71       901        99
VIS    2025250     20200   20.2000  144.6800       8.8        70       901        98
VIS    2025250     20200   20.2000  144.6800       8.8        69       901        97
VIS    2025250     20200   20.1800  144.6500       9.2        71       960        90
VIS    2025250     20200   20.1800  144.6100       8.5        67       941        93
VIS    2025250     20200   20.1900  144.6000       8.4        67       936        94
VIS    2025250     20200   20.1800  144.5800       8.7        68       909        98
VIS    2025250     20200   20.1900  144.5600       9.0        70       899        96
VIS    2025250     20200   20.1900  144.5300       8.5        73       896        98
VIS    2025250     20200   20.1800  144.5000       8.7        72       944        94
VIS    2025250     20200   20.1800  144.4600       8.9        71       908        93
VIS    2025250     20200   20.1800  144.4600       8.8        71       908        94
VIS    2025250     20200   20.1800  144.4300       9.0        68       903        90
VIS    2025250     20200   20.1800  144.3700       9.2        67       917        92
VIS    2025250     20200   20.1800  144.3100       8.4        85       944        92
VIS    2025250     20200   20.1900  143.2600      13.5        51       984        93
VIS    2025250     20200   20.1700  143.2100      10.8        67       937        95
VIS    2025250     20200   20.1800  143.1900      11.2        60       937        95
VIS    2025250     20200   20.1900  143.1800      11.3        59       937        95
VIS    2025250     20200   20.1700  142.4700      11.6        77       940        92
VIS    2025250     20200   20.1800  142.4500      12.4        74       951        95
VIS    2025250     20200   20.1800  142.4400      12.9        75       940        97
VIS    2025250     20200   20.1800  142.4200      11.4        84       911        96
VIS    2025250     20200   20.1700  142.3800      10.8        95       899        96
VIS    2025250     20200   20.1700  142.3700      12.0        88       901        99
VIS    2025250     20200   20.1800  142.3300      13.5        81       891        96
VIS    2025250     20200   20.1800  142.3000      14.1        86       888        96
VIS    2025250     20200   20.1800  142.2800      15.1        86       888        94
VIS    2025250     20200   20.1600  142.2600      14.6        85       887        94
VIS    2025250     20200   20.1700  142.1900      13.8        74       913        92
VIS    2025250     20200   20.1600  142.1700      13.8        75       916        90
VIS    2025250     20200   20.1800  142.1400      14.3        75       965        99
VIS    2025250     20200   20.1700  142.0800      14.3        78       895        92
VIS    2025250     20200   20.1700  142.0700      14.2        77       895        91
VIS    2025250     20200   20.1600  142.0500      14.3        76       897        90
VIS    2025250     20200   20.1600  141.9900      15.0        78       897        90
VIS    2025250     20200   20.1800  141.9800      14.6        79       904        92
VIS    2025250     20200   20.1800  141.9500      15.2        78       897        91
VIS    2025250     20200   20.1700  141.9200      14.8        76       895        90
VIS    2025250     20200   20.1800  141.8100      13.3        83       908        94
VIS    2025250     20200   20.1600  141.7600      13.9        82       969        97
VIS    2025250     20200   20.1600  141.7600      13.8        84       969        97
VIS    2025250     20200   20.1800  141.7300      12.0        95       967        92
VIS    2025250     20200   20.1600  141.6900      11.7        87       919        97
VIS    2025250     20200   20.1600  141.5900      12.8        97       866        95
VIS    2025250     20200   20.1600  141.5800      13.4        97       853        94
VIS    2025250     20200   20.1600  141.5400      13.0        96       889        98
VIS    2025250     20200   20.1800  141.4600      12.0        80       916        90
VIS    2025250     20200   20.1700  141.4400      12.0        87       911        96
VIS    2025250     20200   20.1600  141.2700      14.2        85       969        93
VIS    2025250     20200   20.1600  141.2700      13.9        84       970        92
VIS    2025250     20200   20.1600  141.2500      14.1        86       969        94
VIS    2025250     20200   20.1600  141.2100      14.0        90       970        94
VIS    2025250     20200   20.1600  141.1900      14.1        89       961        95
VIS    2025250     20200   20.1700  141.1500      13.8        86       953        97
VIS    2025250     20200   20.1800  141.1500      13.5        86       953        98
VIS    2025250     20200   20.1700  141.1200      13.5        87       904        94
VIS    2025250     20200   20.1600  141.0800      14.7        90       892        92
VIS    2025250     20200   20.1800  141.0600      14.4        92       892        93
VIS    2025250     20200   20.1700  141.0300      14.6        92       892        93
VIS    2025250     20200   20.1700  141.0200      14.5        92       893        93
VIS    2025250     20200   20.1600  141.0000      13.9        89       890        93
VIS    2025250     20200   20.1600  140.9000      14.2        93       882        91
VIS    2025250     20200   20.1600  140.8700      14.9        93       889        90
VIS    2025250     20200   20.1600  140.7700      13.1        88       901        93
VIS    2025250     20200   20.2200  149.3400       5.1        83       992        94
VIS    2025250     20200   20.1900  147.7200       5.6        59       983        99
VIS    2025250     20200   20.1800  147.7000       5.4        62       983        92
VIS    2025250     20200   20.1700  146.6700       8.7        58       943        96
VIS    2025250     20200   20.1600  145.3000       9.5        73       965        92
VIS    2025250     20200   20.1800  145.2800       9.8        67       954        93
VIS    2025250     20200   20.1700  145.2000       9.5        82       889        95
VIS    2025250     20200   20.1800  145.1200      10.1        74       842        91
VIS    2025250     20200   20.1600  145.0800       9.7        79       839        92
VIS    2025250     20200   20.1600  145.0700       9.5        80       839        94
VIS    2025250     20200   20.1600  145.0500       9.1        79       839        96
VIS    2025250     20200   20.1600  145.0100       8.7        71       854        93
VIS    2025250     20200   20.1800  144.9800       8.1        68       840        93
VIS    2025250     20200   20.1800  144.9700       7.9        66       840        94
VIS    2025250     20200   20.1600  144.9300       8.8        70       834        90
VIS    2025250     20200   20.1600  144.9100       8.8        75       837        94
VIS    2025250     20200   20.1600  144.9000       9.0        76       837        93
VIS    2025250     20200   20.1600  144.8600       8.3        73       854        94
VIS    2025250     20200   20.1800  144.8500       8.3        72       869        93
VIS    2025250     20200   20.1600  144.8200       8.4        70       913        96
VIS    2025250     20200   20.1600  144.8000       8.8        69       913        97
VIS    2025250     20200   20.1800  144.7600       9.5        64       925        99
VIS    2025250     20200   20.1600  144.7500       9.4        67       923       100
VIS    2025250     20200   20.1700  144.7200       9.3        72       901        99
VIS    2025250     20200   20.1700  144.7000       9.2        74       905       100
VIS    2025250     20200   20.1600  144.6800       9.6        75       924        96
VIS    2025250     20200   20.1700  144.6600       9.1        73       960        91
VIS    2025250     20200   20.1500  144.6100       9.3        68       937        92
VIS    2025250     20200   20.1600  144.5900       8.7        68       915        99
VIS    2025250     20200   20.1500  144.5700       8.6        68       915        99
VIS    2025250     20200   20.1600  144.5600       8.5        70       910        99
VIS    2025250     20200   20.1600  144.5200       8.9        73       944        94
VIS    2025250     20200   20.1600  144.5100       9.1        72       945        93
VIS    2025250     20200   20.1600  144.4800       9.4        67       918        94
VIS    2025250     20200   20.1700  144.4600       9.0        71       908        94
VIS    2025250     20200   20.1500  144.4200       9.0        65       905        93
VIS    2025250     20200   20.1500  144.4000       8.8        67       903        93
VIS    2025250     20200   20.1600  144.3700       9.2        66       922        95
VIS    2025250     20200   20.1700  144.3500       9.0        67       922        95
VIS    2025250     20200   20.1700  144.3400       8.7        71       924        97
VIS    2025250     20200   20.1400  143.2100      10.4        96       882        95
VIS    2025250     20200   20.1400  142.4900      11.5        83       904        92
VIS    2025250     20200   20.1500  142.4800      11.9        79       920        92
VIS    2025250     20200   20.1400  142.4500      13.2        80       898        95
VIS    2025250     20200   20.1600  142.4400      13.4        78       915        96
VIS    2025250     20200   20.1500  142.3900      11.0        98       888        99
VIS    2025250     20200   20.1600  142.3700      11.3        96       888        99
VIS    2025250     20200   20.1500  142.3400      12.9        86       883        98
VIS    2025250     20200   20.1500  142.3300      12.9        89       883        98
VIS    2025250     20200   20.1500  142.2900      13.4        91       882        96
VIS    2025250     20200   20.1500  142.2700      14.4        85       886        92
VIS    2025250     20200   20.1600  142.2700      14.4        85       886        94
VIS    2025250     20200   20.1600  142.1500      14.2        76       936        96
VIS    2025250     20200   20.1400  141.9500      15.1        77       892        91
VIS    2025250     20200   20.1500  141.9500      15.3        77       892        90
VIS    2025250     20200   20.1400  141.9200      15.0        76       898        90
VIS    2025250     20200   20.1600  141.7600      14.0        82       969        96
VIS    2025250     20200   20.1400  141.7100      12.2        86       914        96
VIS    2025250     20200   20.1400  141.6800      11.6        87       911        95
VIS    2025250     20200   20.1400  141.6800      11.7        87       911        94
VIS    2025250     20200   20.1300  141.6500      11.7        91       892        94
VIS    2025250     20200   20.1400  141.6200      11.4        99       879        96
VIS    2025250     20200   20.1400  141.5900      12.1        96       874        97
VIS    2025250     20200   20.1400  141.5800      12.2        96       874        97
VIS    2025250     20200   20.1400  141.5500      12.3        93       889        97
VIS    2025250     20200   20.1300  141.4600      12.8        83       904        91
VIS    2025250     20200   20.1400  141.3300      13.3        88       929        92
VIS    2025250     20200   20.1400  141.3000      13.8        83       932        92
VIS    2025250     20200   20.1300  141.2700      14.2        86       932        94
VIS    2025250     20200   20.1300  141.2600      14.4        87       932        96
VIS    2025250     20200   20.1500  141.2200      14.3        90       922        96
VIS    2025250     20200   20.1300  141.2000      14.4        91       902        94
VIS    2025250     20200   20.1400  141.1900      14.6        91       902        94
VIS    2025250     20200   20.1400  141.1600      14.8        88       902        92
VIS    2025250     20200   20.1500  141.1200      14.5        88       895        92
VIS    2025250     20200   20.1500  141.1100      14.4        88       896        92
VIS    2025250     20200   20.1300  141.0800      15.1        92       890        92
VIS    2025250     20200   20.1500  141.0600      14.9        91       890        92
VIS    2025250     20200   20.1400  141.0300      13.3        90       895        90
VIS    2025250     20200   20.1400  141.0000      13.3        91       879        92
VIS    2025250     20200   20.1300  140.9000      14.1        89       887        91
VIS    2025250     20200   20.1500  140.8900      14.6        92       889        90
VIS    2025250     20200   20.1400  140.8200      14.4        89       896        91
VIS    2025250     20200   20.1500  140.8000      14.4        90       898        93
VIS    2025250     20200   20.1500  140.7700      13.1        87       901        93
VIS    2025250     20200   20.1400  140.7500      13.2        89       896        93
VIS    2025250     20200   20.1700  147.7400       6.0        60       968        91
VIS    2025250     20200   20.1600  147.7100       5.9        54       968        92
VIS    2025250     20200   20.1500  146.6700       8.6        56       943        91
VIS    2025250     20200   20.1700  146.6700       8.6        58       943        96
VIS    2025250     20200   20.1400  145.3400       8.7        77       974        93
VIS    2025250     20200   20.1500  145.3200       9.2        77       965        94
VIS    2025250     20200   20.1500  145.3100       9.5        76       960        95
VIS    2025250     20200   20.1400  145.2600       9.6        80       943        96
VIS    2025250     20200   20.1500  145.2600       9.7        80       939        94
VIS    2025250     20200   20.1300  145.2300       9.5        81       839        97
VIS    2025250     20200   20.1300  145.2000       9.7        79       839        96
VIS    2025250     20200   20.1300  145.1800      10.0        81       840        95
VIS    2025250     20200   20.1400  145.1600      10.3        84       842        94
VIS    2025250     20200   20.1400  145.1100      10.7        78       869        93
VIS    2025250     20200   20.1500  145.1100      10.5        77       845        91
VIS    2025250     20200   20.1400  145.0800       9.9        78       877        94
VIS    2025250     20200   20.1500  145.0500       8.8        80       842        97
VIS    2025250     20200   20.1400  145.0200       8.5        74       858        97
VIS    2025250     20200   20.1500  145.0100       8.7        70       854        93
VIS    2025250     20200   20.1500  144.9500       8.9        69       836        90
VIS    2025250     20200   20.1400  144.9000       9.3        74       837        93
VIS    2025250     20200   20.1500  144.8800       8.9        76       844        92
VIS    2025250     20200   20.1300  144.8600       8.7        70       844        92
VIS    2025250     20200   20.1500  144.8200       8.6        71       913        97
VIS    2025250     20200   20.1500  144.8100       8.7        70       916        98
VIS    2025250     20200   20.1300  144.7900       9.1        68       943        98
VIS    2025250     20200   20.1500  144.7500       9.4        67       922       100
VIS    2025250     20200   20.1300  144.7400       9.6        71       901        97
VIS    2025250     20200   20.1500  144.7100       9.7        74       901        99
VIS    2025250     20200   20.1500  144.6800       9.7        74       924        97
VIS    2025250     20200   20.1500  144.6200       9.4        68       961        91
VIS    2025250     20200   20.1500  144.6100       9.3        67       937        91
VIS    2025250     20200   20.1500  144.5800       8.6        68       915        99
VIS    2025250     20200   20.1300  144.5700       8.9        65       918        97
VIS    2025250     20200   20.1400  144.5400       9.0        67       922        98
VIS    2025250     20200   20.1300  144.5200       9.6        66       918        94
VIS    2025250     20200   20.1300  144.4900       9.7        65       918        98
VIS    2025250     20200   20.1300  144.4100       9.1        61       901        94
VIS    2025250     20200   20.1300  144.3800       9.8        62       896        94
VIS    2025250     20200   20.1300  144.3600      10.2        73       896        95
VIS    2025250     20200   20.1400  144.3300       9.7        90       918        91
VIS    2025250     20200   20.1300  143.2300       9.8       109       882        90
VIS    2025250     20200   20.1300  143.2300      10.1       107       882        94
VIS    2025250     20200   20.1300  142.6300      11.2        86       949        90
VIS    2025250     20200   20.1200  142.5600      10.3        94       894        98
VIS    2025250     20200   20.1300  142.5100      11.4        87       904        92
VIS    2025250     20200   20.1300  142.4800      12.4        81       904        93
VIS    2025250     20200   20.1300  142.4600      13.2        81       898        92
VIS    2025250     20200   20.1300  142.4400      12.9        85       893        98
VIS    2025250     20200   20.1200  142.4200      12.2        92       876        99
VIS    2025250     20200   20.1200  142.3900      12.3        91       874        98
VIS    2025250     20200   20.1300  142.3700      12.3        91       880        99
VIS    2025250     20200   20.1200  142.3300      13.0        91       877        98
VIS    2025250     20200   20.1100  142.3100      13.2        91       874        96
VIS    2025250     20200   20.1100  142.2800      13.2        81       877        93
VIS    2025250     20200   20.1100  142.2700      13.6        80       877        93
VIS    2025250     20200   20.1200  142.2500      14.1        75       877        90
VIS    2025250     20200   20.1300  142.2100      14.3        77       885        90
VIS    2025250     20200   20.1200  142.2000      14.0        79       889        92
VIS    2025250     20200   20.1300  142.1600      14.2        77       916        91
VIS    2025250     20200   20.1200  141.9700      14.8        77       888        90
VIS    2025250     20200   20.1300  141.9500      14.9        77       892        91
VIS    2025250     20200   20.1300  141.9300      14.7        79       894        92
VIS    2025250     20200   20.1300  141.8600      14.6        89       913        98
VIS    2025250     20200   20.1200  141.8000      13.1        83       971        96
VIS    2025250     20200   20.1300  141.7700      13.7        82       932        97
VIS    2025250     20200   20.1300  141.7400      14.4        83       916        95
VIS    2025250     20200   20.1200  141.7100      11.8        88       911        96
VIS    2025250     20200   20.1200  141.6800      11.4        94       891        93
VIS    2025250     20200   20.1100  141.6500      11.9        99       891        98
VIS    2025250     20200   20.1100  141.6200      12.2        97       892        99
VIS    2025250     20200   20.1300  141.6000      11.7        97       879        98
VIS    2025250     20200   20.1100  141.5800      11.9        90       886        96
VIS    2025250     20200   20.1200  141.5600      11.8        92       886        97
VIS    2025250     20200   20.1100  141.4100      11.4        87       906        91
VIS    2025250     20200   20.1100  141.3900      11.3        88       916        97
VIS    2025250     20200   20.1100  141.3500      13.3        84       924        94
VIS    2025250     20200   20.1100  141.3300      13.2        83       924        93
VIS    2025250     20200   20.1100  141.3000      13.2        84       911        92
VIS    2025250     20200   20.1100  141.3000      13.3        84       911        92
VIS    2025250     20200   20.1100  141.2700      14.3        87       911        93
VIS    2025250     20200   20.1100  141.2400      14.8        90       893        91
VIS    2025250     20200   20.1300  141.2200      14.6        90       902        93
VIS    2025250     20200   20.1300  141.1900      14.8        92       902        94
VIS    2025250     20200   20.1100  141.1700      15.5        92       889        91
VIS    2025250     20200   20.1100  141.1300      15.3        88       890        90
VIS    2025250     20200   20.1300  141.1200      14.8        88       892        91
VIS    2025250     20200   20.1100  141.0900      15.1        88       890        91
VIS    2025250     20200   20.1300  141.0700      15.2        92       890        92
VIS    2025250     20200   20.1200  141.0100      13.1        93       879        93
VIS    2025250     20200   20.1300  141.0100      13.1        92       879        92
VIS    2025250     20200   20.1100  140.9300      13.5        88       890        92
VIS    2025250     20200   20.1200  140.8900      14.2        88       889        92
VIS    2025250     20200   20.1200  140.8800      14.2        89       889        92
VIS    2025250     20200   20.1100  140.8500      14.7        87       892        91
VIS    2025250     20200   20.1200  140.8200      14.8        90       896        93
VIS    2025250     20200   20.1100  140.8100      14.8        91       898        93
VIS    2025250     20200   20.1600  147.7200       5.8        55       968        92
VIS    2025250     20200   20.1400  146.6700       8.4        57       931        93
VIS    2025250     20200   20.1300  146.6500       7.3        63       925        93
VIS    2025250     20200   20.1400  146.6300       7.1        67       930        97
VIS    2025250     20200   20.1200  145.3300       8.7        78       946        96
VIS    2025250     20200   20.1300  145.3200       8.9        78       946        97
VIS    2025250     20200   20.1300  145.3000       9.6        78       934        98
VIS    2025250     20200   20.1100  145.2600       9.7        76       913        98
VIS    2025250     20200   20.1100  145.2300       9.5        77       836        94
VIS    2025250     20200   20.1100  145.2100       9.6        77       837        95
VIS    2025250     20200   20.1300  145.2000       9.7        78       839        96
VIS    2025250     20200   20.1200  145.1600      10.2        81       844        94
VIS    2025250     20200   20.1200  145.1500      10.4        84       844        94
VIS    2025250     20200   20.1100  145.1100      10.4        79       894        96
VIS    2025250     20200   20.1300  145.1000      10.5        77       889        95
VIS    2025250     20200   20.1200  145.0700       9.6        80       885        96
VIS    2025250     20200   20.1300  145.0400       8.5        80       858        97
VIS    2025250     20200   20.1100  145.0200       8.5        79       847        98
VIS    2025250     20200   20.1100  144.9100       9.8        68       832        92
VIS    2025250     20200   20.1300  144.8600       8.9        69       844        92
VIS    2025250     20200   20.1100  144.8300       9.2        69       910        92
VIS    2025250     20200   20.1100  144.8000       9.0        70       922        93
VIS    2025250     20200   20.1100  144.7700       9.6        66       947        96
VIS    2025250     20200   20.1100  144.7500      10.1        62       916        97
VIS    2025250     20200   20.1200  144.7300      10.0        70       901        97
VIS    2025250     20200   20.1100  144.7000      10.2        72       903        97
VIS    2025250     20200   20.1200  144.6700      10.2        66       933        98
VIS    2025250     20200   20.1100  144.6400      10.4        55       947        95
VIS    2025250     20200   20.1200  144.6200       9.4        63       969        92
VIS    2025250     20200   20.1100  144.5900       9.3        63       941        97
VIS    2025250     20200   20.1000  144.5900       9.4        62       941        97
VIS    2025250     20200   20.1100  144.5600       9.6        61       917        95
VIS    2025250     20200   20.1100  144.5200       9.7        63       910        95
VIS    2025250     20200   20.1100  144.5000       9.5        63       908        98
VIS    2025250     20200   20.1100  144.4900       9.4        63       908        98
VIS    2025250     20200   20.1000  144.4200       9.2        62       887        93
VIS    2025250     20200   20.1200  144.3300      10.8        92       816        93
VIS    2025250     20200   20.1100  144.3100       9.8        96       829        91
VIS    2025250     20200   20.0900  143.2600       9.4       113       857        96
VIS    2025250     20200   20.1000  143.2600       9.6       115       842        96
VIS    2025250     20200   20.1000  142.7600      11.5        74       896        93
VIS    2025250     20200   20.1000  142.6700      11.9        80       924        96
VIS    2025250     20200   20.1000  142.6300       9.2        95       891        95
VIS    2025250     20200   20.1000  142.6000       9.4        97       881        97
VIS    2025250     20200   20.1000  142.6000       9.4        97       883        97
VIS    2025250     20200   20.1000  142.5300      12.0        93       893        97
VIS    2025250     20200   20.0900  142.5200      12.8        95       893        97
VIS    2025250     20200   20.0900  142.5000      13.4        91       884        92
VIS    2025250     20200   20.0900  142.4700      13.8        88       878        95
VIS    2025250     20200   20.1100  142.4500      13.1        88       880        97
VIS    2025250     20200   20.1000  142.4200      11.8        93       874        99
VIS    2025250     20200   20.0900  142.3900      12.1        92       871        98
VIS    2025250     20200   20.1000  142.3700      12.8        88       872        96
VIS    2025250     20200   20.0900  142.3600      12.6        90       872        97
VIS    2025250     20200   20.1000  142.3300      12.8        91       872        97
VIS    2025250     20200   20.0900  142.3100      12.8        88       872        96
VIS    2025250     20200   20.1100  142.2800      13.2        82       875        92
VIS    2025250     20200   20.0900  142.1700      14.1        82       882        91
VIS    2025250     20200   20.1000  142.1500      13.3        82       882        90
VIS    2025250     20200   20.1000  142.0700      13.0        79       870        91
VIS    2025250     20200   20.1000  141.9200      13.6        82       894        93
VIS    2025250     20200   20.0900  141.9200      12.8        85       920        98
VIS    2025250     20200   20.0900  141.8800      12.7        91       932        98
VIS    2025250     20200   20.0900  141.8600      12.5        92       945        95
VIS    2025250     20200   20.1100  141.7700      13.8        82       932        92
VIS    2025250     20200   20.0900  141.7300      13.5        81       903        90
VIS    2025250     20200   20.0900  141.7000      12.0        89       895        90
VIS    2025250     20200   20.0900  141.6800      11.6        95       891        90
VIS    2025250     20200   20.0800  141.6500      12.2        97       892        91
VIS    2025250     20200   20.1000  141.6300      12.2        96       895        99
VIS    2025250     20200   20.1000  141.6200      12.3        96       895        99
VIS    2025250     20200   20.1000  141.5900      12.8        88       888        95
VIS    2025250     20200   20.1000  141.5700      12.9        86       888        94
VIS    2025250     20200   20.0800  141.5300      12.8        87       894        91
VIS    2025250     20200   20.0900  141.4500      13.3        87       892        91
VIS    2025250     20200   20.0900  141.4300      12.5        91       894        96
VIS    2025250     20200   20.0800  141.4000      12.0        89       898        97
VIS    2025250     20200   20.1000  141.3700      12.8        84       924        96
VIS    2025250     20200   20.0900  141.3500      12.8        84       897        91
VIS    2025250     20200   20.1000  141.3100      12.9        85       911        92
VIS    2025250     20200   20.0900  141.3000      13.0        85       900        92
VIS    2025250     20200   20.0900  141.2700      13.7        88       900        96
VIS    2025250     20200   20.0900  141.2500      14.4        89       892        92
VIS    2025250     20200   20.0900  141.2200      14.6        92       892        93
VIS    2025250     20200   20.0900  141.2000      14.5        93       887        93
VIS    2025250     20200   20.0900  141.1600      15.6        95       884        91
VIS    2025250     20200   20.0800  141.1300      15.4        92       887        91
VIS    2025250     20200   20.0800  141.0900      15.1        87       889        90
VIS    2025250     20200   20.0900  141.0900      15.1        87       892        91
VIS    2025250     20200   20.0900  141.0500      15.2        86       896        91
VIS    2025250     20200   20.1000  141.0400      13.6        88       896        91
VIS    2025250     20200   20.1000  141.0000      12.9        93       865        90
VIS    2025250     20200   20.1000  140.9700      12.7        93       890        93
VIS    2025250     20200   20.1000  140.9500      13.1        91       893        95
VIS    2025250     20200   20.0800  140.9300      14.3        87       893        92
VIS    2025250     20200   20.0800  140.9200      14.4        88       893        92
VIS    2025250     20200   20.1000  140.8800      14.2        89       889        92
VIS    2025250     20200   20.1000  140.8600      14.3        87       892        91
VIS    2025250     20200   20.1000  140.8400      14.5        87       896        92
VIS    2025250     20200   20.1400  150.0600       5.4        73       986        96
VIS    2025250     20200   20.1400  150.0400       5.4        73       983        90
VIS    2025250     20200   20.1000  146.6600       7.6        74       914        96
VIS    2025250     20200   20.1000  146.6500       7.4        72       914        92
VIS    2025250     20200   20.1200  146.6200       7.3        62       940        96
VIS    2025250     20200   20.0900  145.3800       9.0        61       960        93
VIS    2025250     20200   20.0900  145.3600       8.6        65       960        95
VIS    2025250     20200   20.0900  145.3400       8.6        69       942        98
VIS    2025250     20200   20.0900  145.3200       9.1        75       930        97
VIS    2025250     20200   20.1000  145.2800       9.8        76       913        99
VIS    2025250     20200   20.1000  145.2500       9.8        73       912        96
VIS    2025250     20200   20.1000  145.2400       9.6        72       836        91
VIS    2025250     20200   20.0800  145.2000       9.4        71       834        94
VIS    2025250     20200   20.0800  145.1900       9.4        68       837        92
VIS    2025250     20200   20.0900  145.1600      10.2        70       849        91
VIS    2025250     20200   20.1000  145.1500      10.2        78       885        96
VIS    2025250     20200   20.0900  145.1100       9.9        80       901        95
VIS    2025250     20200   20.0800  145.1000       9.8        80       901        95
VIS    2025250     20200   20.0900  145.0700       9.7        79       880        95
VIS    2025250     20200   20.1000  145.0400       8.9        80       850        95
VIS    2025250     20200   20.1000  145.0200       8.7        79       847        96
VIS    2025250     20200   20.0800  145.0000       9.3        71       844        90
VIS    2025250     20200   20.1000  144.9100       9.8        67       832        91
VIS    2025250     20200   20.1000  144.9000       9.7        68       832        91
VIS    2025250     20200   20.0900  144.8800       9.2        68       832        92
VIS    2025250     20200   20.1000  144.8000       9.0        69       922        91
VIS    2025250     20200   20.1000  144.7700       9.6        65       947        96
VIS    2025250     20200   20.1000  144.7500      10.1        62       916        97
VIS    2025250     20200   20.0900  144.7300      10.0        64       913        98
VIS    2025250     20200   20.1000  144.7100      10.1        70       903        95
VIS    2025250     20200   20.0900  144.6300      10.0        60       962        96
VIS    2025250     20200   20.0800  144.5900      10.2        58       956        94
VIS    2025250     20200   20.1000  144.5800       9.7        60       918        96
VIS    2025250     20200   20.0800  144.5600      10.3        54       915        93
VIS    2025250     20200   20.0900  144.5200       9.9        60       907        91
VIS    2025250     20200   20.0800  144.5100       9.6        61       907        95
VIS    2025250     20200   20.1000  144.4900       9.3        63       907        98
VIS    2025250     20200   20.0800  144.4500       8.9        71       888        90
VIS    2025250     20200   20.1000  144.4200       9.0        64       887        93
VIS    2025250     20200   20.0900  144.4100       9.0        61       887        93
VIS    2025250     20200   20.1000  144.3400      10.8        88       774        94
VIS    2025250     20200   20.0900  144.3000       8.5        89       801        97
VIS    2025250     20200   20.1000  144.2400       8.4        92       873        97
VIS    2025250     20200   20.0800  144.0200       9.5        69       963        91
VIS    2025250     20200   20.0700  143.3800       9.7       115       862        95
VIS    2025250     20200   20.0800  143.3400       9.0       110       876        93
VIS    2025250     20200   20.0700  143.3100       9.1       104       878        91
VIS    2025250     20200   20.0700  143.2500       9.9       121       837        94
VIS    2025250     20200   20.0900  143.2400      10.0       121       837        92
VIS    2025250     20200   20.0700  142.7500      11.6        81       872        93
VIS    2025250     20200   20.0800  142.7200      10.4        84       863        90
VIS    2025250     20200   20.0900  142.6800      12.9        81       899        96
VIS    2025250     20200   20.0900  142.6600      11.1        86       899        98
VIS    2025250     20200   20.0800  142.6200       8.8        98       872        95
VIS    2025250     20200   20.0900  142.6000       9.2        97       873        97
VIS    2025250     20200   20.0600  142.5800       9.5        94       872        97
VIS    2025250     20200   20.0700  142.5500      10.9        94       883        94
VIS    2025250     20200   20.0800  142.5300      11.7        95       888       100
VIS    2025250     20200   20.0700  142.5100      13.0        92       882        98
VIS    2025250     20200   20.0700  142.4800      13.7        89       878        95
VIS    2025250     20200   20.0700  142.4500      12.7        88       871        96
VIS    2025250     20200   20.0700  142.4400      12.1        89       869        92
VIS    2025250     20200   20.0800  142.4000      12.4        91       869        97
VIS    2025250     20200   20.0700  142.3900      12.1        95       869        99
VIS    2025250     20200   20.0800  142.3700      12.4        91       871        98
VIS    2025250     20200   20.0600  142.3400      11.6        95       865        99
VIS    2025250     20200   20.0800  142.3000      12.2        86       871        96
VIS    2025250     20200   20.0700  142.2800      14.0        82       872        93
VIS    2025250     20200   20.0700  142.2500      13.6        81       875        92
VIS    2025250     20200   20.0800  142.2200      13.7        82       877        92
VIS    2025250     20200   20.0800  142.1300      12.6        94       873        93
VIS    2025250     20200   20.0800  142.1300      12.8        93       873        93
VIS    2025250     20200   20.0800  142.0900      13.4        86       864        92
VIS    2025250     20200   20.0600  142.0600      14.6        82       865        90
VIS    2025250     20200   20.0600  142.0500      14.6        82       865        90
VIS    2025250     20200   20.0700  142.0000      12.2        97       885        93
VIS    2025250     20200   20.0700  141.9400      13.1        80       885        93
VIS    2025250     20200   20.0800  141.9200      12.7        83       911        97
VIS    2025250     20200   20.0700  141.8900      12.9        92       908        98
VIS    2025250     20200   20.0600  141.8600      13.0        99       901        98
VIS    2025250     20200   20.0600  141.8400      12.7        96       906        97
VIS    2025250     20200   20.0600  141.8300      12.5        94       906        90
VIS    2025250     20200   20.0600  141.7800      13.3        80       900        93
VIS    2025250     20200   20.0600  141.7100      13.3        84       903        93
VIS    2025250     20200   20.0700  141.7100      12.8        85       897        94
VIS    2025250     20200   20.0600  141.6900      12.5        89       894        96
VIS    2025250     20200   20.0600  141.6400      13.3        90       891        95
VIS    2025250     20200   20.0600  141.6300      13.9        87       888        92
VIS    2025250     20200   20.0600  141.6000      15.0        85       888        91
VIS    2025250     20200   20.0700  141.5900      14.6        85       886        91
VIS    2025250     20200   20.0600  141.5500      12.8        90       888        95
VIS    2025250     20200   20.0700  141.5300      12.3        92       890        93
VIS    2025250     20200   20.0600  141.4500      12.5        88       882        93
VIS    2025250     20200   20.0700  141.4200      12.4        91       892        96
VIS    2025250     20200   20.0600  141.4000      12.8        87       883        94
VIS    2025250     20200   20.0600  141.3900      12.6        86       894        95
VIS    2025250     20200   20.0700  141.3600      13.2        84       895        93
VIS    2025250     20200   20.0600  141.3400      12.8        86       883        92
VIS    2025250     20200   20.0700  141.3200      12.8        86       886        93
VIS    2025250     20200   20.0700  141.2900      13.4        86       891        93
VIS    2025250     20200   20.0700  141.2500      13.9        89       891        95
VIS    2025250     20200   20.0700  141.2500      14.1        89       892        95
VIS    2025250     20200   20.0700  141.2200      13.8        93       888        93
VIS    2025250     20200   20.0700  141.1800      14.1        96       870        92
VIS    2025250     20200   20.0700  141.1500      14.9        96       882        92
VIS    2025250     20200   20.0800  141.1500      15.4        95       884        92
VIS    2025250     20200   20.0600  141.1100      15.2        89       889        91
VIS    2025250     20200   20.0600  141.1000      15.1        88       889        90
VIS    2025250     20200   20.0600  141.0600      15.4        87       895        90
VIS    2025250     20200   20.0800  141.0500      14.8        86       895        91
VIS    2025250     20200   20.0800  141.0100      13.6        87       887        91
VIS    2025250     20200   20.0700  141.0000      13.4        86       895        91
VIS    2025250     20200   20.0800  140.9600      12.7        90       894        94
VIS    2025250     20200   20.0700  140.9300      14.4        87       895        92
VIS    2025250     20200   20.0600  140.9000      14.5        89       896        93
VIS    2025250     20200   20.0600  140.8600      14.2        86       896        90
VIS    2025250     20200   20.0800  140.8400      14.1        85       896        91
VIS    2025250     20200   20.1300  150.0800       5.0        77       987        97
VIS    2025250     20200   20.1100  150.0100       5.4        61       982        97
VIS    2025250     20200   20.0700  146.7200       8.4        64       963        90
VIS    2025250     20200   20.0900  146.7100       8.2        68       953        93
VIS    2025250     20200   20.0800  146.6800       7.9        76       906        99
VIS    2025250     20200   20.0900  146.6600       7.7        75       906        97
VIS    2025250     20200   20.0900  146.6200       6.8        57       931        90
VIS    2025250     20200   20.0600  145.4000       8.5        66       960        97
VIS    2025250     20200   20.0600  145.3900       8.5        64       960        97
VIS    2025250     20200   20.0600  145.3700       8.8        63       942        93
VIS    2025250     20200   20.0800  145.3500       8.8        66       942        98
VIS    2025250     20200   20.0800  145.3200       9.2        75       917        97
VIS    2025250     20200   20.0700  145.2900       9.4        80       911        96
VIS    2025250     20200   20.0600  145.2600       8.7        79       911        98
VIS    2025250     20200   20.0800  145.2300       9.3        73       832        93
VIS    2025250     20200   20.0800  145.2200       9.2        74       832        94
VIS    2025250     20200   20.0800  145.1900       9.3        69       837        92
VIS    2025250     20200   20.0700  145.1600       9.8        66       842        90
VIS    2025250     20200   20.0700  145.1500       9.9        69       850        90
VIS    2025250     20200   20.0600  145.1200       9.6        78       892        94
VIS    2025250     20200   20.0600  145.0900       9.6        81       901        93
VIS    2025250     20200   20.0700  145.0600       9.5        73       877        96
VIS    2025250     20200   20.0700  145.0500       9.3        73       873        95
VIS    2025250     20200   20.0700  145.0100       9.2        72       844        90
VIS    2025250     20200   20.0800  144.9100       9.6        63       832        91
VIS    2025250     20200   20.0800  144.9000       9.2        68       832        93
VIS    2025250     20200   20.0600  144.8700       8.4        69       840        91
VIS    2025250     20200   20.0600  144.8500       8.4        69       849        91
VIS    2025250     20200   20.0800  144.7900       9.0        65       942        93
VIS    2025250     20200   20.0800  144.7700       9.5        61       942        98
VIS    2025250     20200   20.0800  144.7400      10.0        61       920        98
VIS    2025250     20200   20.0600  144.7000       9.4        65       930        96
VIS    2025250     20200   20.0600  144.6100      10.3        60       973        96
VIS    2025250     20200   20.0700  144.5900      10.4        56       956        95
VIS    2025250     20200   20.0700  144.5700      10.5        52       916        92
VIS    2025250     20200   20.0500  144.5600      10.3        51       915        93
VIS    2025250     20200   20.0500  144.5300       9.9        55       910        93
VIS    2025250     20200   20.0700  144.4900       9.6        62       905        95
VIS    2025250     20200   20.0700  144.4700       9.1        68       888        95
VIS    2025250     20200   20.0700  144.4600       9.1        71       888        96
VIS    2025250     20200   20.0700  144.4200       9.0        67       907        93
VIS    2025250     20200   20.0700  144.3100       8.1        74       849        94
VIS    2025250     20200   20.0600  144.2800       7.6        84       853        97
VIS    2025250     20200   20.0500  144.1400       8.0        70       970        91
VIS    2025250     20200   20.0600  144.0600       9.0        63       932        92
VIS    2025250     20200   20.0600  144.0400       9.0        64       932        95
VIS    2025250     20200   20.0500  143.3900      10.1       117       868        92
VIS    2025250     20200   20.0600  143.3800       9.9       115       868        93
VIS    2025250     20200   20.0400  143.3500       9.0       110       859        96
VIS    2025250     20200   20.0500  143.3200       8.7       103       862        97
VIS    2025250     20200   20.0400  143.2900       9.4       109       843        96
VIS    2025250     20200   20.0500  143.2600       9.5       117       828        96
VIS    2025250     20200   20.0600  143.2600       9.7       119       828        95
VIS    2025250     20200   20.0500  142.7600      12.1        77       863        92
VIS    2025250     20200   20.0500  142.7200      10.7        87       814        93
VIS    2025250     20200   20.0500  142.7100      10.5        89       828        94
VIS    2025250     20200   20.0500  142.6800      10.0        95       849        98
VIS    2025250     20200   20.0500  142.6700       9.8       100       849        99
VIS    2025250     20200   20.0500  142.6500       9.9       101       859        98
VIS    2025250     20200   20.0500  142.6100       9.8        94       863        97
VIS    2025250     20200   20.0600  142.5900       9.2        94       869        97
VIS    2025250     20200   20.0600  142.5700      10.3        96       873        99
VIS    2025250     20200   20.0500  142.5300      11.9        95       878        97
VIS    2025250     20200   20.0500  142.5200      12.9        92       878        97
VIS    2025250     20200   20.0400  142.4800      14.2        86       877        92
VIS    2025250     20200   20.0600  142.4600      14.0        85       877        95
VIS    2025250     20200   20.0400  142.4500      12.5        88       869        94
VIS    2025250     20200   20.0500  142.4100      12.5        95       869        96
VIS    2025250     20200   20.0600  142.3900      12.2        97       868        99
VIS    2025250     20200   20.0500  142.3700      12.7        95       865        98
VIS    2025250     20200   20.0500  142.3500      12.2        93       865        98
VIS    2025250     20200   20.0400  142.3200      11.0        98       860        96
VIS    2025250     20200   20.0500  142.3000      11.9        91       866        97
VIS    2025250     20200   20.0400  142.2700      14.4        83       868        90
VIS    2025250     20200   20.0600  142.2500      13.8        83       873        93
VIS    2025250     20200   20.0500  142.2200      13.1        89       872        96
VIS    2025250     20200   20.0500  142.1900      13.0        94       853        95
VIS    2025250     20200   20.0500  142.1700      12.8        98       780        92
VIS    2025250     20200   20.0500  142.1400      12.3       101       733        93
VIS    2025250     20200   20.0400  142.1100      13.2        91       805        90
VIS    2025250     20200   20.0400  142.0800      14.1        92       854        92
VIS    2025250     20200   20.0600  142.0600      14.2        86       865        91
VIS    2025250     20200   20.0600  142.0300      13.0        93       870        97
VIS    2025250     20200   20.0400  142.0000      12.7        98       886        93
VIS    2025250     20200   20.0500  141.9900      12.2        98       885        93
VIS    2025250     20200   20.0500  141.9500      13.6        83       891        94
VIS    2025250     20200   20.0600  141.9200      12.6        88       906        97
VIS    2025250     20200   20.0500  141.8900      13.5        95       901        98
VIS    2025250     20200   20.0400  141.8800      13.7       102       895        98
VIS    2025250     20200   20.0500  141.8600      13.2       106       897        98
VIS    2025250     20200   20.0600  141.8400      12.5        98       901        97
VIS    2025250     20200   20.0600  141.7800      13.2        81       900        94
VIS    2025250     20200   20.0400  141.7500      15.4        85       903        92
VIS    2025250     20200   20.0600  141.7200      14.1        83       904        92
VIS    2025250     20200   20.0500  141.7100      13.7        86       903        93
VIS    2025250     20200   20.0400  141.6900      13.7        89       886        94
VIS    2025250     20200   20.0300  141.6700      13.2        90       885        96
VIS    2025250     20200   20.0300  141.6400      13.4        88       888        93
VIS    2025250     20200   20.0300  141.6000      13.8        87       889        92
VIS    2025250     20200   20.0300  141.6000      13.7        87       889        92
VIS    2025250     20200   20.0500  141.5500      12.5        90       888        95
VIS    2025250     20200   20.0400  141.5300      12.8        82       888        92
VIS    2025250     20200   20.0400  141.4600      12.2        82       882        91
VIS    2025250     20200   20.0500  141.4500      12.4        85       882        92
VIS    2025250     20200   20.0400  141.4100      13.5        82       881        91
VIS    2025250     20200   20.0400  141.4000      13.6        82       881        91
VIS    2025250     20200   20.0500  141.3600      13.3        85       883        92
VIS    2025250     20200   20.0300  141.3300      13.3        90       879        94
VIS    2025250     20200   20.0400  141.3300      13.0        89       879        93
VIS    2025250     20200   20.0300  141.3000      13.3        89       876        91
VIS    2025250     20200   20.0300  141.2800      14.2        90       876        92
VIS    2025250     20200   20.0300  141.2400      14.5        90       874        90
VIS    2025250     20200   20.0400  141.2100      13.7        97       859        92
VIS    2025250     20200   20.0500  141.1900      13.2        98       865        94
VIS    2025250     20200   20.0500  141.1800      13.2        98       866        94
VIS    2025250     20200   20.0500  141.1400      14.9        92       882        91
VIS    2025250     20200   20.0500  141.1300      15.0        90       887        91
VIS    2025250     20200   20.0500  141.1100      15.2        89       889        91
VIS    2025250     20200   20.0400  141.0700      15.5        89       895        91
VIS    2025250     20200   20.0500  141.0500      15.3        88       895        91
VIS    2025250     20200   20.0400  141.0400      15.2        86       895        90
VIS    2025250     20200   20.0500  141.0000      13.9        83       896        90
VIS    2025250     20200   20.0400  140.9200      14.9        86       904        92
VIS    2025250     20200   20.0300  140.8900      14.8        89       906        93
VIS    2025250     20200   20.0900  150.0000       5.0        55       980        90
VIS    2025250     20200   20.0800  149.3900       4.9        73       999        97
VIS    2025250     20200   20.0600  146.7300       8.4        60       963        90
VIS    2025250     20200   20.0600  146.7100       8.1        63       927        94
VIS    2025250     20200   20.0700  146.6700       7.6        73       905        99
VIS    2025250     20200   20.0400  145.4500       9.4        74       980        90
VIS    2025250     20200   20.0400  145.3900       8.3        71       953        95
VIS    2025250     20200   20.0600  145.3700       8.8        64       953        94
VIS    2025250     20200   20.0400  145.3600       8.7        71       925        94
VIS    2025250     20200   20.0400  145.3400       9.4        80       911        94
VIS    2025250     20200   20.0400  145.3000       9.7        85       911        94
VIS    2025250     20200   20.0400  145.2900       9.6        85       912        94
VIS    2025250     20200   20.0500  145.2500       8.5        80       911        97
VIS    2025250     20200   20.0300  145.2200       8.6        81       834        97
VIS    2025250     20200   20.0400  145.2000       8.8        74       834        94
VIS    2025250     20200   20.0400  145.1300       9.4        73       858        90
VIS    2025250     20200   20.0400  145.1000       9.3        81       906        91
VIS    2025250     20200   20.0500  145.0900       9.3        81       905        92
VIS    2025250     20200   20.0400  145.0500       9.5        70       880        94
VIS    2025250     20200   20.0500  145.0400       9.3        69       873        91
VIS    2025250     20200   20.0500  144.8500       8.4        69       849        91
VIS    2025250     20200   20.0500  144.8100       8.7        67       885        92
VIS    2025250     20200   20.0400  144.7800       9.5        58       941        95
VIS    2025250     20200   20.0500  144.7300       9.6        65       931        99
VIS    2025250     20200   20.0300  144.6100      11.1        54       973        96
VIS    2025250     20200   20.0500  144.5900      10.8        52       941        94
VIS    2025250     20200   20.0300  144.5700      10.6        50       930        94
VIS    2025250     20200   20.0500  144.5500      10.1        52       913        93
VIS    2025250     20200   20.0500  144.5100       9.9        58       909        90
VIS    2025250     20200   20.0300  144.4100      11.5        53       913        90
VIS    2025250     20200   20.0300  144.3500       9.0        68       884        91
VIS    2025250     20200   20.0300  144.2900      10.7        73       959        96
VIS    2025250     20200   20.0300  144.2800      10.6        73       959        93
VIS    2025250     20200   20.0300  144.2500       9.6        65       971        90
VIS    2025250     20200   20.0300  144.1600       8.9        74       944        93
VIS    2025250     20200   20.0400  144.1600       8.9        70       951        92
VIS    2025250     20200   20.0300  144.1300       8.6        76       914        96
VIS    2025250     20200   20.0500  144.0900       9.5        70       944        93
VIS    2025250     20200   20.0300  144.0700       9.6        66       900        92
VIS    2025250     20200   20.0300  144.0600       9.5        65       902        93
VIS    2025250     20200   20.0300  143.5400       8.3        93       922        93
VIS    2025250     20200   20.0200  143.5300       8.1        87       922        94
VIS    2025250     20200   20.0300  143.5100       7.9        85       939        92
VIS    2025250     20200   20.0400  143.3900      10.4       118       855        92
VIS    2025250     20200   20.0400  143.3800      10.1       115       854        94
VIS    2025250     20200   20.0200  143.3500      10.2       113       840        96
VIS    2025250     20200   20.0200  143.3300       9.4       110       849        96
VIS    2025250     20200   20.0300  143.3000       9.7       110       866        92
VIS    2025250     20200   20.0300  143.2700      10.1       116       843        92
VIS    2025250     20200   20.0200  143.2300      10.2       119       866        90
VIS    2025250     20200   20.0400  143.2100      10.7       123       866        90
VIS    2025250     20200   20.0200  142.7700      11.0        80       848        93
VIS    2025250     20200   20.0200  142.7300      10.5        91       814        96
VIS    2025250     20200   20.0300  142.7100      10.4        92       819        96
VIS    2025250     20200   20.0300  142.7000       9.8        93       834        96
VIS    2025250     20200   20.0200  142.6700       9.0       100       847        97
VIS    2025250     20200   20.0200  142.6400      10.3       103       859        99
VIS    2025250     20200   20.0300  142.6200      10.5        96       862        99
VIS    2025250     20200   20.0200  142.6000      10.7        91       862        97
VIS    2025250     20200   20.0200  142.5700      10.7        95       868        95
VIS    2025250     20200   20.0300  142.5500      11.0        97       872        96
VIS    2025250     20200   20.0100  142.5200      12.1        96       875        91
VIS    2025250     20200   20.0300  142.4900      13.9        86       877        93
VIS    2025250     20200   20.0200  142.4700      13.9        86       871        95
VIS    2025250     20200   20.0300  142.4500      12.4        90       869        96
VIS    2025250     20200   20.0300  142.4200      12.0        92       869        97
VIS    2025250     20200   20.0300  142.3900      12.2        98       865        99
VIS    2025250     20200   20.0300  142.3700      12.7        95       859        98
VIS    2025250     20200   20.0300  142.3400      11.8        96       857        99
VIS    2025250     20200   20.0300  142.3100      11.2        99       860        92
VIS    2025250     20200   20.0200  142.2600      14.1        88       868        90
VIS    2025250     20200   20.0300  142.2600      14.1        87       868        92
VIS    2025250     20200   20.0300  142.2200      12.4        95       858        96
VIS    2025250     20200   20.0200  142.2100      12.5        98       853        95
VIS    2025250     20200   20.0200  142.1000      13.3        94       854        94
VIS    2025250     20200   20.0300  142.0900      13.6        95       852        93
VIS    2025250     20200   20.0200  142.0600      14.1        98       864        96
VIS    2025250     20200   20.0200  142.0400      13.5        95       875        93
VIS    2025250     20200   20.0300  142.0100      12.3        98       888        97
VIS    2025250     20200   20.0200  141.9900      13.2        92       891        98
VIS    2025250     20200   20.0100  141.9500      13.8        98       886        98
VIS    2025250     20200   20.0200  141.9400      13.9        97       891        99
VIS    2025250     20200   20.0200  141.9000      14.1       104       888        91
VIS    2025250     20200   20.0200  141.8900      14.1       104       888        92
VIS    2025250     20200   20.0200  141.8500      13.0       115       872        93
VIS    2025250     20200   20.0200  141.8400      12.8       117       875        94
VIS    2025250     20200   20.0100  141.8000      13.9       101       889        94
VIS    2025250     20200   20.0300  141.7800      14.7        88       900        93
VIS    2025250     20200   20.0200  141.7500      14.7        88       900        93
VIS    2025250     20200   20.0200  141.7500      14.9        88       900        91
VIS    2025250     20200   20.0100  141.7100      14.2        93       881        93
VIS    2025250     20200   20.0300  141.7000      13.9        89       885        93
VIS    2025250     20200   20.0300  141.6700      13.0        89       885        96
VIS    2025250     20200   20.0200  141.6300      13.5        88       888        92
VIS    2025250     20200   20.0200  141.6300      13.5        88       888        91
VIS    2025250     20200   20.0300  141.6000      13.4        87       889        92
VIS    2025250     20200   20.0300  141.4500      12.3        83       882        91
VIS    2025250     20200   20.0100  141.4200      13.9        80       879        90
VIS    2025250     20200   20.0100  141.3900      14.3        84       871        90
VIS    2025250     20200   20.0200  141.3800      14.3        85       871        91
VIS    2025250     20200   20.0200  141.3400      14.0        90       874        93
VIS    2025250     20200   20.0200  141.3200      13.3        89       879        93
VIS    2025250     20200   20.0200  141.3000      13.7        89       876        92
VIS    2025250     20200   20.0200  141.2700      14.6        90       876        93
VIS    2025250     20200   20.0100  141.2600      14.9        89       876        92
VIS    2025250     20200   20.0300  141.2200      13.9        94       866        91
VIS    2025250     20200   20.0300  141.2100      14.2        96       866        92
VIS    2025250     20200   20.0200  141.1700      14.7        93       879        92
VIS    2025250     20200   20.0300  141.1600      14.4        93       882        91
VIS    2025250     20200   20.0200  141.1300      14.9        90       885        91
VIS    2025250     20200   20.0300  141.1000      15.1        89       889        91
VIS    2025250     20200   20.0100  141.0700      14.9        93       892        93
VIS    2025250     20200   20.0300  141.0500      15.2        89       895        92
VIS    2025250     20200   20.0100  140.9800      15.2        84       901        90
VIS    2025250     20200   20.0200  140.9600      15.2        82       901        90
VIS    2025250     20200   20.0100  140.9400      15.1        84       904        91
VIS    2025250     20200   20.0000  140.4200      13.3        85       954        91
VIS    2025250     20200   20.0600  150.0800       5.7        81       992        94
VIS    2025250     20200   20.0700  149.9300       4.4        94       974        91
VIS    2025250     20200   20.0700  149.8800       6.1        84       977        93
VIS    2025250     20200   20.0800  149.8500       5.9        81       977        95
VIS    2025250     20200   20.0600  149.4000       5.4        72       985        95
VIS    2025250     20200   20.0600  149.3900       5.7        82       985        96
VIS    2025250     20200   20.0400  146.7200       8.4        57       930        93
VIS    2025250     20200   20.0300  146.7000       8.3        59       915        96
VIS    2025250     20200   20.0400  146.6600       7.8        57       918        96
VIS    2025250     20200   20.0300  145.4500       9.5        73       980        93
VIS    2025250     20200   20.0300  145.4400       9.3        75       980        90
VIS    2025250     20200   20.0200  145.4100       8.8        76       953        94
VIS    2025250     20200   20.0100  145.3900       8.7        79       930        97
VIS    2025250     20200   20.0300  145.3700       8.7        75       915        96
VIS    2025250     20200   20.0200  145.3400       9.7        86       911        92
VIS    2025250     20200   20.0200  145.3100       9.8        87       912        92
VIS    2025250     20200   20.0100  145.2900       9.6        85       913        95
VIS    2025250     20200   20.0200  145.2500       9.2        83       911        96
VIS    2025250     20200   20.0100  145.2400       9.1        80       913        96
VIS    2025250     20200   20.0300  145.2200       8.6        81       834        96
VIS    2025250     20200   20.0100  145.1000       9.4        79       880        92
VIS    2025250     20200   20.0200  145.1000       9.3        81       887        90
VIS    2025250     20200   20.0100  145.0600       9.9        73       880        93
VIS    2025250     20200   20.0300  145.0500       9.8        65       873        94
VIS    2025250     20200   20.0300  144.8500       8.6        69       849        93
VIS    2025250     20200   20.0100  144.8300       9.1        66       858        91
VIS    2025250     20200   20.0300  144.7700       9.7        58       941        96
VIS    2025250     20200   20.0200  144.6500      10.8        87       957        91
VIS    2025250     20200   20.0000  144.6100      11.4        58       980        97
VIS    2025250     20200   20.0200  144.6000      11.0        54       973        95
VIS    2025250     20200   20.0200  144.5700      10.4        50       930        95
VIS    2025250     20200   20.0000  144.5400      10.2        54       921        95
VIS    2025250     20200   20.0100  144.5300      10.2        54       921        95
VIS    2025250     20200   20.0000  144.5100      10.3        54       923        93
VIS    2025250     20200   20.0200  144.4400      11.5        56       942        95
VIS    2025250     20200   20.0200  144.4200      11.8        53       914        92
VIS    2025250     20200   20.0200  144.3500       9.4        65       908        95
VIS    2025250     20200   20.0100  144.3200       9.9        66       929        90
VIS    2025250     20200   20.0100  144.2900      11.1        71       944        98
VIS    2025250     20200   20.0200  144.2900      11.0        72       959        97
VIS    2025250     20200   20.0100  144.2600       9.7        72       931        93
VIS    2025250     20200   20.0100  144.1700       9.2        82       937        92
VIS    2025250     20200   20.0200  144.1600       9.0        76       944        93
VIS    2025250     20200   20.0200  144.1300       9.5        83       897        96
VIS    2025250     20200   20.0100  143.5500       8.3        89       908        95
VIS    2025250     20200   20.0200  143.5300       8.1        85       922        94
VIS    2025250     20200   20.0200  143.5100       8.0        77       922        94
VIS    2025250     20200   20.0100  143.3700      10.4       119       840        93
VIS    2025250     20200   20.0100  143.3500      10.3       114       840        95
VIS    2025250     20200   20.0100  143.3400       9.9       111       849        95
VIS    2025250     20200   20.0100  143.2200      10.1       115       866        92
VIS    2025250     20200   20.0000  142.9600      12.7        63       945        97
VIS    2025250     20200   19.9900  142.9500      12.9        65       945        96
VIS    2025250     20200   20.0000  142.7700      10.0        87       840        95
VIS    2025250     20200   20.0100  142.7400      10.2        90       815        96
VIS    2025250     20200   20.0100  142.7100       9.5        99       834        98
VIS    2025250     20200   20.0100  142.7000       9.3        97       834        98
VIS    2025250     20200   20.0100  142.6800       8.7        98       847        96
VIS    2025250     20200   20.0100  142.6400      10.0       100       857        99
VIS    2025250     20200   20.0000  142.6200      10.3        97       853        98
VIS    2025250     20200   20.0100  142.5900      10.6        92       853        97
VIS    2025250     20200   19.9900  142.5700      10.2        94       828        97
VIS    2025250     20200   20.0000  142.5400      10.4       102       865        96
VIS    2025250     20200   19.9900  142.5300      10.1       102       865        96
VIS    2025250     20200   20.0000  142.5100      11.4        97       871        93
VIS    2025250     20200   20.0000  142.4700      13.3        91       869        97
VIS    2025250     20200   20.0000  142.4400      13.2        89       868        93
VIS    2025250     20200   19.9900  142.4300      13.4        91       868        96
VIS    2025250     20200   19.9900  142.4100      12.4        87       863        96
VIS    2025250     20200   19.9900  142.3800      12.1        89       853        96
VIS    2025250     20200   20.0100  142.3400      12.0        97       856        96
VIS    2025250     20200   19.9900  142.3400      12.7        97       854        96
VIS    2025250     20200   19.9900  142.3100      13.7        98       857        97
VIS    2025250     20200   20.0000  142.2600      14.0        90       866        92
VIS    2025250     20200   19.9900  142.2200      13.1        93       858        92
VIS    2025250     20200   19.9900  142.2100      13.0        94       857        90
VIS    2025250     20200   19.9900  142.1300      15.1        95       857        90
VIS    2025250     20200   19.9900  142.1000      13.8       101       858        96
VIS    2025250     20200   20.0100  142.0700      13.5       101       858        93
VIS    2025250     20200   20.0100  142.0700      13.6       101       861        93
VIS    2025250     20200   19.9900  142.0200      14.0        85       877        91
VIS    2025250     20200   20.0000  142.0100      13.3        89       886        95
VIS    2025250     20200   20.0000  141.9800      12.4        96       885        93
VIS    2025250     20200   20.0100  141.9600      13.4        98       885        97
VIS    2025250     20200   20.0000  141.9300      14.0       105       885        97
VIS    2025250     20200   19.9900  141.9100      13.8       109       876        92
VIS    2025250     20200   20.0000  141.9000      13.5       111       876        92
VIS    2025250     20200   20.0000  141.8700      13.0       114       873        90
VIS    2025250     20200   19.9900  141.7900      14.5        94       889        96
VIS    2025250     20200   20.0000  141.7700      15.2        89       900        95
VIS    2025250     20200   19.9900  141.7400      13.9        90       881        90
VIS    2025250     20200   19.9900  141.7200      13.8        91       878        93
VIS    2025250     20200   19.9800  141.6600      11.0        87       886        95
VIS    2025250     20200   19.9900  141.6300      11.4        88       886        96
VIS    2025250     20200   19.9900  141.6200      11.7        89       885        95
VIS    2025250     20200   19.9900  141.6000      11.8        86       883        93
VIS    2025250     20200   19.9900  141.4600      13.4        78       881        90
VIS    2025250     20200   20.0000  141.4100      14.4        80       878        90
VIS    2025250     20200   20.0000  141.3700      14.8        87       871        91
VIS    2025250     20200   20.0000  141.3600      14.5        88       871        91
VIS    2025250     20200   20.0000  141.3400      14.1        90       881        94
VIS    2025250     20200   19.9800  141.3100      14.8        88       883        93
VIS    2025250     20200   20.0000  141.2800      15.1        90       883        93
VIS    2025250     20200   20.0000  141.2400      15.2        89       877        91
VIS    2025250     20200   20.0000  141.2000      15.4        91       879        90
VIS    2025250     20200   19.9800  141.0900      15.1        89       887        90
VIS    2025250     20200   20.0000  140.4600      11.0        98       965        91
VIS    2025250     20200   20.0000  140.4000      13.5        86       932        94
VIS    2025250     20200   20.0400  149.8400       6.9        84       992        90
VIS    2025250     20200   20.0000  146.7600       8.8        59       973        92
VIS    2025250     20200   20.0200  146.7300       8.5        58       959        93
VIS    2025250     20200   20.0000  146.6900       8.9        64       930        98
VIS    2025250     20200   20.0000  146.6800       8.9        64       917        98
VIS    2025250     20200   19.9900  145.4500       9.1        77       960        93
VIS    2025250     20200   19.9900  145.4100       9.1        79       928        97
VIS    2025250     20200   19.9900  145.4000       9.1        80       920        98
VIS    2025250     20200   20.0100  145.3800       9.0        81       913        97
VIS    2025250     20200   19.9900  145.3400       9.9        86       911        94
VIS    2025250     20200   19.9900  145.3300       9.9        85       913        93
VIS    2025250     20200   20.0000  145.3000       9.7        87       916        93
VIS    2025250     20200   19.9900  145.2600       9.0        81       915        97
VIS    2025250     20200   20.0000  145.2500       9.1        80       915        96
VIS    2025250     20200   20.0000  145.2300       9.0        78       840        95
VIS    2025250     20200   20.0000  145.1200       9.3        77       854        90
VIS    2025250     20200   20.0000  145.1100       9.3        78       877        93
VIS    2025250     20200   19.9800  145.0600       9.9        67       877        93
VIS    2025250     20200   19.9900  145.0600       9.9        67       877        94
VIS    2025250     20200   19.9800  144.8900       9.5        66       858        92
VIS    2025250     20200   20.0000  144.8200       9.3        63       862        90
VIS    2025250     20200   19.9900  144.6200      11.1        60       980        98
VIS    2025250     20200   19.9800  144.6100      10.8        58       980        99
VIS    2025250     20200   19.9900  144.5800      10.9        56       942        98
VIS    2025250     20200   20.0000  144.5600      10.5        53       930        96
VIS    2025250     20200   20.0000  144.5300      10.3        54       922        94
VIS    2025250     20200   19.9800  144.5100      10.2        56       923        95
VIS    2025250     20200   19.9800  144.4900      10.0        58       929        96
VIS    2025250     20200   19.9800  144.4600       9.2        66       945        92
VIS    2025250     20200   19.9900  144.4300      10.1        50       965        97
VIS    2025250     20200   19.9900  144.4100      11.0        48       966        95
VIS    2025250     20200   19.9800  144.3800      11.2        61       930        96
VIS    2025250     20200   19.9800  144.3700      11.1        60       924        97
VIS    2025250     20200   19.9900  144.3100      10.4        67       903        92
VIS    2025250     20200   19.9900  144.2800      10.9        75       896        95
VIS    2025250     20200   19.9900  144.2500       8.7        84       882        95
VIS    2025250     20200   20.0000  144.2400       8.3        81       882        92
VIS    2025250     20200   20.0000  144.2200       8.2        93       882        92
VIS    2025250     20200   20.0000  144.1700       9.4        85       927        92
VIS    2025250     20200   19.9800  144.1300      10.0        74       909        92
VIS    2025250     20200   19.9900  143.5300       8.0        78       900        96
VIS    2025250     20200   19.9700  143.4700      11.4       113       862        91
VIS    2025250     20200   19.9900  143.4400      11.0       112       862        90
VIS    2025250     20200   19.9700  143.4200      10.8       107       773        96
VIS    2025250     20200   19.9800  143.3900       9.7       117       800        95
VIS    2025250     20200   19.9700  143.3800       9.4       117       800        97
VIS    2025250     20200   19.9800  143.3400      10.0       105       862        94
VIS    2025250     20200   19.9700  143.3300      10.5       104       869        93
VIS    2025250     20200   19.9800  143.2400       9.9       109       875        94
VIS    2025250     20200   19.9800  143.2300      10.1       105       878        96
VIS    2025250     20200   19.9700  143.2100      10.3        99       878        92
VIS    2025250     20200   19.9800  143.1800      10.1       100       866        93
VIS    2025250     20200   19.9900  142.7900      10.8        85       839        95
VIS    2025250     20200   19.9700  142.7500       9.2       100       837        97
VIS    2025250     20200   19.9700  142.7400       9.2       100       834        96
VIS    2025250     20200   19.9900  142.6300      10.0        94       853        97
VIS    2025250     20200   19.9900  142.6200      10.3        96       845        97
VIS    2025250     20200   19.9800  142.5900      10.7        98       828        98
VIS    2025250     20200   19.9800  142.5700      10.0        97       813        98
VIS    2025250     20200   19.9700  142.5500       9.9       100       813        99
VIS    2025250     20200   19.9800  142.5100      10.2       102       859        97
VIS    2025250     20200   19.9700  142.5000      10.7        98       859        95
VIS    2025250     20200   19.9700  142.4600      13.9        96       866        97
VIS    2025250     20200   19.9700  142.4300      13.9        94       866        96
VIS    2025250     20200   19.9800  142.4300      13.6        92       867        96
VIS    2025250     20200   19.9600  142.4000      12.5        92       856        97
VIS    2025250     20200   19.9600  142.3600      12.9        83       854        91
VIS    2025250     20200   19.9600  142.3400      14.6        86       868        92
VIS    2025250     20200   19.9700  142.3300      14.3        90       857        90
VIS    2025250     20200   19.9800  142.3100      14.4        92       866        95
VIS    2025250     20200   19.9600  142.2800      13.2        86       868        94
VIS    2025250     20200   19.9800  142.2400      13.6        93       862        96
VIS    2025250     20200   19.9800  142.2300      13.4        91       862        94
VIS    2025250     20200   19.9800  142.1300      15.0        96       857        90
VIS    2025250     20200   19.9700  142.1100      15.3        95       856        92
VIS    2025250     20200   19.9800  142.0800      13.1       102       868        97
VIS    2025250     20200   19.9600  142.0500      12.9        92       877        96
VIS    2025250     20200   19.9600  142.0200      13.8        91       875        96
VIS    2025250     20200   19.9700  142.0100      13.5        88       875        95
VIS    2025250     20200   19.9700  141.9900      13.1        89       876        95
VIS    2025250     20200   19.9600  141.9300      13.8       111       879        94
VIS    2025250     20200   19.9700  141.8900      13.6       111       876        95
VIS    2025250     20200   19.9700  141.7800      14.5        90       888        96
VIS    2025250     20200   19.9700  141.7600      13.4        88       876        93
VIS    2025250     20200   19.9600  141.7500      12.2        86       875        91
VIS    2025250     20200   19.9600  141.7200      12.5        85       875        92
VIS    2025250     20200   19.9700  141.6800      11.9        86       883        94
VIS    2025250     20200   19.9700  141.6700      11.4        86       883        95
VIS    2025250     20200   19.9700  141.6300      10.3        89       883        95
VIS    2025250     20200   19.9600  141.6200      10.0        92       883        95
VIS    2025250     20200   19.9800  141.4800      13.5        79       882        90
VIS    2025250     20200   19.9800  141.4300      14.0        79       879        90
VIS    2025250     20200   19.9600  141.3600      15.0        88       888        93
VIS    2025250     20200   19.9600  141.3500      15.0        89       888        93
VIS    2025250     20200   19.9800  141.3200      14.6        88       886        93
VIS    2025250     20200   19.9700  141.3000      14.6        89       886        94
VIS    2025250     20200   19.9600  141.2600      15.2        86       889        92
VIS    2025250     20200   19.9600  141.2500      15.4        85       886        91
VIS    2025250     20200   19.9700  140.9700      14.2        85       902        92
VIS    2025250     20200   19.9600  140.4900      11.1        84       950        97
VIS    2025250     20200   19.9700  140.4500      12.0        87       950        97
VIS    2025250     20200   19.9500  140.4200      13.5        84       914        91
VIS    2025250     20200   19.9500  140.4100      14.6        86       908        91
VIS    2025250     20200   19.9700  140.3900      14.7        90       908        92
VIS    2025250     20200   20.0200  149.8400       6.8        86       984        91
VIS    2025250     20200   20.0200  149.8100       6.6        85       989        92
VIS    2025250     20200   20.0200  149.3500       5.9        85       988        92
VIS    2025250     20200   19.9900  146.7400       8.9        60       973        95
VIS    2025250     20200   19.9900  146.7300       8.9        60       974        96
VIS    2025250     20200   19.9900  146.6900       9.0        64       938        97
VIS    2025250     20200   19.9900  146.6900       9.0        64       934        97
VIS    2025250     20200   19.9800  146.6600       9.2        64       938        94
VIS    2025250     20200   19.9800  146.1800       9.1        55       968        93
VIS    2025250     20200   19.9600  145.4900       9.3        80       973        91
VIS    2025250     20200   19.9700  145.4600       9.2        80       960        92
VIS    2025250     20200   19.9800  145.4300       9.2        81       933        94
VIS    2025250     20200   19.9600  145.4100       9.1        82       924        95
VIS    2025250     20200   19.9700  145.4000       9.0        81       920        97
VIS    2025250     20200   19.9800  145.3600       9.4        83       911        96
VIS    2025250     20200   19.9600  145.3300       9.5        84       918        95
VIS    2025250     20200   19.9600  145.3200       9.5        83       918        96
VIS    2025250     20200   19.9600  145.2900       9.1        81       920        96
VIS    2025250     20200   19.9800  145.2600       8.7        81       916        97
VIS    2025250     20200   19.9700  145.2500       8.4        79       914        97
VIS    2025250     20200   19.9600  145.2200       8.7        74       839        94
VIS    2025250     20200   19.9800  145.0600      10.0        65       877        92
VIS    2025250     20200   19.9600  145.0500      10.2        58       885        92
VIS    2025250     20200   19.9600  144.9600       9.5        67       849        91
VIS    2025250     20200   19.9700  144.9100       9.2        69       866        95
VIS    2025250     20200   19.9700  144.9100       9.2        70       869        96
VIS    2025250     20200   19.9800  144.8700       9.6        63       858        90
VIS    2025250     20200   19.9600  144.6200      10.8        58       980        99
VIS    2025250     20200   19.9600  144.6000      10.7        56       952        98
VIS    2025250     20200   19.9500  144.5800      10.4        53       931        95
VIS    2025250     20200   19.9500  144.5500      10.3        52       929        91
VIS    2025250     20200   19.9700  144.5000       9.9        58       923        95
VIS    2025250     20200   19.9700  144.4900       9.9        58       927        95
VIS    2025250     20200   19.9500  144.4600       9.2        63       929        92
VIS    2025250     20200   19.9700  144.4400       8.3        61       963        94
VIS    2025250     20200   19.9500  144.4200       8.3        68       945        91
VIS    2025250     20200   19.9600  144.3800      11.0        68       928        98
VIS    2025250     20200   19.9600  144.3700      10.4        64       921        98
VIS    2025250     20200   19.9500  144.3500      10.8        56       917        90
VIS    2025250     20200   19.9500  144.2500       9.2       101       822        93
VIS    2025250     20200   19.9600  144.2400       9.3       100       859        96
VIS    2025250     20200   19.9700  144.2200       8.9        98       862        98
VIS    2025250     20200   19.9600  144.1300       9.9        68       923        92
VIS    2025250     20200   19.9600  144.0700      10.0        64       918        95
VIS    2025250     20200   19.9500  143.6500      10.0       112       894        91
VIS    2025250     20200   19.9500  143.6300       9.6       109       891        93
VIS    2025250     20200   19.9600  143.6200       9.4       109       891        93
VIS    2025250     20200   19.9500  143.4800      11.4       113       837        94
VIS    2025250     20200   19.9500  143.4500      10.6       113       776        97
VIS    2025250     20200   19.9600  143.4300      10.4       110       766        97
VIS    2025250     20200   19.9600  143.4200      10.3       107       766        98
VIS    2025250     20200   19.9700  143.4000      10.0       111       773        98
VIS    2025250     20200   19.9400  143.3600      10.6       103       869        96
VIS    2025250     20200   19.9400  143.3500      10.6       103       869        96
VIS    2025250     20200   19.9400  143.3300      11.0       106       872        94
VIS    2025250     20200   19.9400  143.2100      10.8        90       863        94
VIS    2025250     20200   19.9500  143.2000      10.7        90       867        95
VIS    2025250     20200   19.9400  143.1800      10.2        96       852        96
VIS    2025250     20200   19.9500  143.1300      11.4       123       852        91
VIS    2025250     20200   19.9500  143.1000      10.9       119       809        93
VIS    2025250     20200   19.9400  143.0800      10.6       114       852        93
VIS    2025250     20200   19.9400  142.9900       8.0        80       937        91
VIS    2025250     20200   19.9500  142.9500      10.2        73       917        93
VIS    2025250     20200   19.9500  142.8100      13.1        86       828        91
VIS    2025250     20200   19.9600  142.7900      11.2        90       839        95
VIS    2025250     20200   19.9600  142.7600       9.5        98       839        98
VIS    2025250     20200   19.9400  142.7200      10.1        94       834        98
VIS    2025250     20200   19.9500  142.6000      11.1        98       821        97
VIS    2025250     20200   19.9400  142.5800      11.0        98       815        97
VIS    2025250     20200   19.9400  142.5500       9.9        99       797        99
VIS    2025250     20200   19.9400  142.5400       9.9        99       797        98
VIS    2025250     20200   19.9400  142.5000      10.4        96       850        98
VIS    2025250     20200   19.9500  142.4900      10.8        97       859        99
VIS    2025250     20200   19.9500  142.4500      13.7        96       865        97
VIS    2025250     20200   19.9400  142.4500      13.6        98       865        98
VIS    2025250     20200   19.9600  142.4000      12.8        92       859        97
VIS    2025250     20200   19.9600  142.3900      12.4        92       856        97
VIS    2025250     20200   19.9600  142.3600      13.1        81       854        90
VIS    2025250     20200   19.9400  142.3400      14.7        79       868        90
VIS    2025250     20200   19.9400  142.3200      15.1        82       869        91
VIS    2025250     20200   19.9400  142.2900      13.3        83       887        96
VIS    2025250     20200   19.9600  142.2700      13.3        88       866        94
VIS    2025250     20200   19.9400  142.1400      14.8        85       877        92
VIS    2025250     20200   19.9500  142.1200      15.0        89       869        92
VIS    2025250     20200   19.9500  142.0600      13.7        85       888        95
VIS    2025250     20200   19.9600  142.0600      13.1        91       883        97
VIS    2025250     20200   19.9500  142.0100      13.7        93       875        97
VIS    2025250     20200   19.9600  141.9800      12.9        96       876        98
VIS    2025250     20200   19.9600  141.9300      14.0       110       880        96
VIS    2025250     20200   19.9600  141.9100      14.0       108       879        95
VIS    2025250     20200   19.9400  141.8800      12.6       114       906        93
VIS    2025250     20200   19.9500  141.8600      12.2       114       895        93
VIS    2025250     20200   19.9400  141.8300      12.5       107       889        95
VIS    2025250     20200   19.9400  141.8100      12.3       101       883        98
VIS    2025250     20200   19.9400  141.7800      13.8        91       876        94
VIS    2025250     20200   19.9500  141.7400      11.5        86       875        92
VIS    2025250     20200   19.9500  141.7200      11.9        85       875        93
VIS    2025250     20200   19.9500  141.7200      12.3        85       875        93
VIS    2025250     20200   19.9400  141.6700      11.2        90       883        96
VIS    2025250     20200   19.9400  141.6700      10.6        92       883        96
VIS    2025250     20200   19.9500  141.6400      10.0        93       883        96
VIS    2025250     20200   19.9400  141.6100      10.5        91       881        96
VIS    2025250     20200   19.9300  141.5800      11.2        82       882        91
VIS    2025250     20200   19.9400  141.3800      15.0        86       889        90
VIS    2025250     20200   19.9500  141.3600      15.0        89       891        93
VIS    2025250     20200   19.9400  141.3500      15.0        91       892        95
VIS    2025250     20200   19.9500  141.3200      14.4        89       889        94
VIS    2025250     20200   19.9300  141.2900      15.0        90       891        94
VIS    2025250     20200   19.9300  141.2700      15.3        88       891        92
VIS    2025250     20200   19.9400  141.2100      14.9        86       885        90
VIS    2025250     20200   19.9400  141.1900      14.7        90       887        91
VIS    2025250     20200   19.9400  141.1700      14.9        89       884        90
VIS    2025250     20200   19.9500  140.9700      13.9        85       916        93
VIS    2025250     20200   19.9300  140.6300      13.9        85       975        96
VIS    2025250     20200   19.9400  140.6000      12.7        87       975        91
VIS    2025250     20200   19.9300  140.5500      14.9        74       960        91
VIS    2025250     20200   19.9300  140.5000      14.5        74       947        91
VIS    2025250     20200   19.9400  140.4900      13.0        78       947        96
VIS    2025250     20200   19.9500  140.3800      14.8        89       905        91
VIS    2025250     20200   19.9700  146.7400       8.8        59       979        94
VIS    2025250     20200   19.9700  146.7300       8.8        58       979        94
VIS    2025250     20200   19.9600  146.6900       9.0        61       953        94
VIS    2025250     20200   19.9600  146.6800       9.0        60       943        94
VIS    2025250     20200   19.9500  146.6400       8.9        57       955        91
VIS    2025250     20200   19.9600  146.1900       9.0        56       968        96
VIS    2025250     20200   19.9500  146.1600       9.6        52       968        95
VIS    2025250     20200   19.9600  145.4900       9.5        81       978        90
VIS    2025250     20200   19.9400  145.4600       9.5        85       937        94
VIS    2025250     20200   19.9500  145.4500       9.6        83       924        96
VIS    2025250     20200   19.9500  145.4100       9.0        82       924        94
VIS    2025250     20200   19.9600  145.3900       8.7        83       918        95
VIS    2025250     20200   19.9400  145.3800       8.7        84       915        94
VIS    2025250     20200   19.9600  145.3300       9.3        84       916        95
VIS    2025250     20200   19.9400  145.3200       9.2        84       919        95
VIS    2025250     20200   19.9400  145.3000       9.4        82       922        97
VIS    2025250     20200   19.9600  145.2800       9.0        81       920        96
VIS    2025250     20200   19.9300  145.2400       8.4        80       914        97
VIS    2025250     20200   19.9500  145.2300       8.7        75       839        94
VIS    2025250     20200   19.9500  145.0900      10.3        68       862        90
VIS    2025250     20200   19.9500  145.0700      10.4        63       885        93
VIS    2025250     20200   19.9300  145.0400      10.4        47       918        92
VIS    2025250     20200   19.9300  145.0300      10.4        47       918        92
VIS    2025250     20200   19.9300  144.9700       9.4        72       852        92
VIS    2025250     20200   19.9500  144.9500       9.1        72       852        93
VIS    2025250     20200   19.9400  144.9300       9.3        72       866        96
VIS    2025250     20200   19.9400  144.8900       9.3        71       880        97
VIS    2025250     20200   19.9300  144.8700       9.1        68       869        94
VIS    2025250     20200   19.9400  144.8400       8.9        66       885        94
VIS    2025250     20200   19.9300  144.6200      10.4        57       972        98
VIS    2025250     20200   19.9400  144.6000      10.3        56       953        98
VIS    2025250     20200   19.9300  144.5800      10.0        54       944        96
VIS    2025250     20200   19.9300  144.5600      10.2        52       941        95
VIS    2025250     20200   19.9300  144.5500      10.4        51       931        93
VIS    2025250     20200   19.9400  144.5200      10.3        54       927        94
VIS    2025250     20200   19.9400  144.4400       8.7        63       927        92
VIS    2025250     20200   19.9300  144.4100       9.1        70       927        98
VIS    2025250     20200   19.9300  144.3500      10.8        58       921        96
VIS    2025250     20200   19.9300  144.3500      11.1        56       921        95
VIS    2025250     20200   19.9500  144.2600       8.9        99       818        91
VIS    2025250     20200   19.9400  144.2500       8.8        97       818        92
VIS    2025250     20200   19.9300  143.6100       9.0        97       874        97
VIS    2025250     20200   19.9200  143.6000       8.7        96       874        95
VIS    2025250     20200   19.9200  143.4900      10.1       108       866        94
VIS    2025250     20200   19.9400  143.4700      11.0       113       779        94
VIS    2025250     20200   19.9300  143.4400       9.5       106       746        98
VIS    2025250     20200   19.9300  143.4200       9.2       106       751        99
VIS    2025250     20200   19.9300  143.4100       9.0       104       751        99
VIS    2025250     20200   19.9200  143.3700       9.3       103       855        98
VIS    2025250     20200   19.9200  143.3500      10.3       104       873        93
VIS    2025250     20200   19.9400  143.3300      11.2       108       873        93
VIS    2025250     20200   19.9400  143.2400      10.1       107       883        95
VIS    2025250     20200   19.9300  143.2100      10.6        93       861        95
VIS    2025250     20200   19.9400  143.1900      10.7        89       852        90
VIS    2025250     20200   19.9300  143.1500      10.5       116       807        96
VIS    2025250     20200   19.9200  143.1400      10.0       118       794        90
VIS    2025250     20200   19.9300  143.1200      10.9       117       809        96
VIS    2025250     20200   19.9200  143.0900      11.2       110       852        95
VIS    2025250     20200   19.9200  142.8100      12.9        85       876        95
VIS    2025250     20200   19.9400  142.7800      10.6        89       850        90
VIS    2025250     20200   19.9400  142.7400      10.0        96       840        98
VIS    2025250     20200   19.9300  142.7200      10.9        91       839        97
VIS    2025250     20200   19.9300  142.7000      11.1        78       837        91
VIS    2025250     20200   19.9200  142.6200      10.6        95       826        91
VIS    2025250     20200   19.9200  142.5900      11.2        95       817        96
VIS    2025250     20200   19.9200  142.5600      10.4       103       797        99
VIS    2025250     20200   19.9300  142.5500      10.0       101       797        99
VIS    2025250     20200   19.9100  142.5300      10.2       102       797        98
VIS    2025250     20200   19.9300  142.5000      10.8        95       847        98
VIS    2025250     20200   19.9200  142.4800      11.7        91       857        97
VIS    2025250     20200   19.9100  142.4500      13.4        96       865        98
VIS    2025250     20200   19.9100  142.4300      13.8        96       866        97
VIS    2025250     20200   19.9300  142.3900      14.1        88       865        94
VIS    2025250     20200   19.9200  142.3800      14.1        85       868        93
VIS    2025250     20200   19.9300  142.2900      13.7        85       890        96
VIS    2025250     20200   19.9200  142.2900      13.2        84       890        97
VIS    2025250     20200   19.9100  142.2700      13.4        76       895        92
VIS    2025250     20200   19.9200  142.2400      14.6        81       878        90
VIS    2025250     20200   19.9100  142.1700      15.2        82       894        92
VIS    2025250     20200   19.9100  142.1500      15.0        82       889        92
VIS    2025250     20200   19.9200  142.1400      15.0        82       889        92
VIS    2025250     20200   19.9100  142.1100      14.4        79       898        93
VIS    2025250     20200   19.9200  142.0800      14.5        82       888        92
VIS    2025250     20200   19.9300  142.0500      14.1        91       885        96
VIS    2025250     20200   19.9300  142.0200      14.2       102       879        98
VIS    2025250     20200   19.9300  141.9900      14.8        99       885        97
VIS    2025250     20200   19.9200  141.9300      14.9       104       898        95
VIS    2025250     20200   19.9200  141.9200      15.0       105       897        95
VIS    2025250     20200   19.9200  141.8700      11.6       117       918        92
VIS    2025250     20200   19.9100  141.8300      12.1        96       889        99
VIS    2025250     20200   19.9200  141.8300      12.0        97       889        99
VIS    2025250     20200   19.9300  141.7800      13.7        95       876        96
VIS    2025250     20200   19.9200  141.7600      12.8        92       875        96
VIS    2025250     20200   19.9300  141.7400      11.3        88       875        95
VIS    2025250     20200   19.9300  141.7300      11.3        87       875        95
VIS    2025250     20200   19.9200  141.7000      13.0        88       878        94
VIS    2025250     20200   19.9100  141.6800      12.3        93       883        97
VIS    2025250     20200   19.9200  141.6400      10.9        95       881        98
VIS    2025250     20200   19.9200  141.6200      10.9        94       881        98
VIS    2025250     20200   19.9100  141.5900      11.0        89       879        92
VIS    2025250     20200   19.9200  141.5600      11.3        84       882        94
VIS    2025250     20200   19.9200  141.4000      14.9        85       892        92
VIS    2025250     20200   19.9100  141.3700      15.1        84       897        92
VIS    2025250     20200   19.9200  141.3600      15.2        88       895        93
VIS    2025250     20200   19.9200  141.3300      14.8        86       897        94
VIS    2025250     20200   19.9100  141.3000      14.9        90       895        95
VIS    2025250     20200   19.9200  141.2900      15.0        90       894        94
VIS    2025250     20200   19.9200  141.2600      15.2        85       892        91
VIS    2025250     20200   19.9200  141.2100      14.6        87       887        90
VIS    2025250     20200   19.9300  141.1900      14.8        90       887        90
VIS    2025250     20200   19.9300  141.1500      14.4        88       878        90
VIS    2025250     20200   19.9100  140.6300      13.8        83       959        99
VIS    2025250     20200   19.9200  140.6100      13.4        86       968        95
VIS    2025250     20200   19.9300  140.5600      14.3        78       960        95
VIS    2025250     20200   19.9300  146.6800       8.8        62       955        91
VIS    2025250     20200   19.9200  146.6500       8.1        61       926        96
VIS    2025250     20200   19.9200  146.6200       7.7        62       921        97
VIS    2025250     20200   19.9200  146.6000       7.2        62       921        94
VIS    2025250     20200   19.9300  145.9900       9.0        53       973        92
VIS    2025250     20200   19.9300  145.4900       9.3        83       973        91
VIS    2025250     20200   19.9300  145.4600       9.4        84       942        94
VIS    2025250     20200   19.9200  145.4400       9.3        84       932        94
VIS    2025250     20200   19.9100  145.4200       9.0        83       932        94
VIS    2025250     20200   19.9300  145.3900       8.6        82       918        94
VIS    2025250     20200   19.9200  145.3700       8.7        85       916        94
VIS    2025250     20200   19.9100  145.3400       8.7        85       920        95
VIS    2025250     20200   19.9300  145.3200       9.2        83       922        96
VIS    2025250     20200   19.9100  145.3000       9.5        83       923        95
VIS    2025250     20200   19.9200  145.2700       9.3        84       914        95
VIS    2025250     20200   19.9100  145.2500       9.2        83       914        97
VIS    2025250     20200   19.9300  145.2200       8.9        73       839        94
VIS    2025250     20200   19.9200  145.2000       9.4        67       839        90
VIS    2025250     20200   19.9100  145.0900      10.0        76       899        95
VIS    2025250     20200   19.9200  145.0700      10.1        70       910        95
VIS    2025250     20200   19.9300  145.0400      10.4        48       918        92
VIS    2025250     20200   19.9300  145.0300      10.3        49       918        93
VIS    2025250     20200   19.9100  144.9900       9.7        68       866        92
VIS    2025250     20200   19.9200  144.9800       9.7        69       858        91
VIS    2025250     20200   19.9300  144.9500       9.3        72       866        95
VIS    2025250     20200   19.9100  144.9100       9.4        68       866        90
VIS    2025250     20200   19.9100  144.9000       9.4        68       882        94
VIS    2025250     20200   19.9300  144.8700       9.3        69       880        96
VIS    2025250     20200   19.9200  144.8500       9.0        66       885        96
VIS    2025250     20200   19.9100  144.6200      10.3        58       981        98
VIS    2025250     20200   19.9000  144.6100      10.1        58       972        98
VIS    2025250     20200   19.9200  144.5700      10.0        54       944        96
VIS    2025250     20200   19.9200  144.5500      10.4        51       941        96
VIS    2025250     20200   19.9200  144.5400      10.6        50       941        94
VIS    2025250     20200   19.9100  144.5100      10.4        49       930        94
VIS    2025250     20200   19.9200  144.5000      10.0        50       926        92
VIS    2025250     20200   19.9000  144.4500       9.6        52       927        90
VIS    2025250     20200   19.9200  144.4200       9.3        65       927        97
VIS    2025250     20200   19.9000  144.4000      10.5        62       927        93
VIS    2025250     20200   19.9200  144.3500      11.1        59       921        97
VIS    2025250     20200   19.9200  144.3400      11.4        58       921        94
VIS    2025250     20200   19.9000  143.6200       8.7        90       873        96
VIS    2025250     20200   19.9200  143.6100       8.7        96       874        95
VIS    2025250     20200   19.9000  143.5500       7.9        95       877        91
VIS    2025250     20200   19.9200  143.4900       9.9       107       865        94
VIS    2025250     20200   19.9200  143.4700       9.8       108       779        96
VIS    2025250     20200   19.9200  143.4600       9.7       107       776        97
VIS    2025250     20200   19.9100  143.4300       8.7        99       774        99
VIS    2025250     20200   19.9100  143.4100       8.7        97       812        99
VIS    2025250     20200   19.9000  143.3700       9.0        99       855        93
VIS    2025250     20200   19.9000  143.3500       9.4       103       867        93
VIS    2025250     20200   19.8900  143.2500       9.8       105       835        98
VIS    2025250     20200   19.9000  143.2400       9.7       104       835        98
VIS    2025250     20200   19.8900  143.2000       9.4        98       788        97
VIS    2025250     20200   19.9100  143.1700       9.8       106       788        98
VIS    2025250     20200   19.9100  143.1500       9.6       113       764        97
VIS    2025250     20200   19.9100  143.1400       9.7       117       764        91
VIS    2025250     20200   19.8900  143.1000      11.1       116       714        93
VIS    2025250     20200   19.9100  143.0900      11.4       109       740        91
VIS    2025250     20200   19.9000  143.0700      10.7       102       759        93
VIS    2025250     20200   19.9000  143.0000       8.9        89       847        90
VIS    2025250     20200   19.8900  142.9800       8.4        93       844        92
VIS    2025250     20200   19.8900  142.9700       8.4        92       844        90
VIS    2025250     20200   19.9100  142.8100      13.1        81       884        95
VIS    2025250     20200   19.9100  142.7500      11.3        93       847        98
VIS    2025250     20200   19.9000  142.7200      12.0        90       845        95
VIS    2025250     20200   19.8900  142.7000      11.7        86       843        91
VIS    2025250     20200   19.9100  142.6300      10.5        97       832        90
VIS    2025250     20200   19.9100  142.6100      11.1        96       817        95
VIS    2025250     20200   19.9000  142.5700      10.9       102       798        98
VIS    2025250     20200   19.9100  142.5400      10.8       102       785        98
VIS    2025250     20200   19.9000  142.5300      11.3       101       806        96
VIS    2025250     20200   19.8900  142.5000      12.1        78       856        90
VIS    2025250     20200   19.8900  142.4400      14.0        88       880        97
VIS    2025250     20200   19.8900  142.4300      13.8        91       878        97
VIS    2025250     20200   19.9100  142.4000      14.7        89       869        94
VIS    2025250     20200   19.9000  142.3900      14.9        87       872        93
VIS    2025250     20200   19.8900  142.3600      14.7        86       872        93
VIS    2025250     20200   19.9000  142.2700      12.8        77       895        94
VIS    2025250     20200   19.9000  142.2400      14.7        74       895        92
VIS    2025250     20200   19.8900  142.2000      15.0        80       894        92
VIS    2025250     20200   19.9000  142.1800      15.4        80       894        90
VIS    2025250     20200   19.8900  142.1600      14.1        84       889        94
VIS    2025250     20200   19.9100  142.1400      15.0        82       889        92
VIS    2025250     20200   19.9100  142.1200      14.1        81       898        94
VIS    2025250     20200   19.8900  142.0900      15.0        82       882        91
VIS    2025250     20200   19.9100  142.0700      15.0        87       885        93
VIS    2025250     20200   19.9100  142.0400      15.3        98       882        96
VIS    2025250     20200   19.9000  141.9800      15.9       102       898        96
VIS    2025250     20200   19.8900  141.9000      13.1       105       920        96
VIS    2025250     20200   19.8900  141.8800      12.5       108       920        96
VIS    2025250     20200   19.9100  141.8700      11.6       115       918        93
VIS    2025250     20200   19.9100  141.8400      11.8        97       889        99
VIS    2025250     20200   19.9100  141.8200      12.5        92       888        99
VIS    2025250     20200   19.9000  141.7600      14.0        93       876        95
VIS    2025250     20200   19.8900  141.7300      14.9        89       877        92
VIS    2025250     20200   19.8900  141.7300      14.6        89       876        92
VIS    2025250     20200   19.9000  141.7000      13.6        90       876        94
VIS    2025250     20200   19.8900  141.6800      13.0        96       882        94
VIS    2025250     20200   19.8800  141.6400      11.9        97       878        99
VIS    2025250     20200   19.9000  141.6200      11.3        95       875        97
VIS    2025250     20200   19.8800  141.5900      11.4       104       871        96
VIS    2025250     20200   19.8800  141.5700      11.7       107       873        96
VIS    2025250     20200   19.8900  141.5600      11.2       108       876        98
VIS    2025250     20200   19.8800  141.4700      12.7        91       886        94
VIS    2025250     20200   19.9000  141.4100      14.7        86       892        92
VIS    2025250     20200   19.9000  141.3500      15.2        82       898        91
VIS    2025250     20200   19.8900  141.3200      14.0        84       898        93
VIS    2025250     20200   19.8900  141.3100      13.7        87       898        94
VIS    2025250     20200   19.9000  141.2700      15.1        88       897        93
VIS    2025250     20200   19.8900  141.2700      14.9        88       897        92
VIS    2025250     20200   19.9000  141.2200      14.7        86       896        91
VIS    2025250     20200   19.8900  141.2200      14.5        86       898        92
VIS    2025250     20200   19.8900  141.1700      14.7        88       896        92
VIS    2025250     20200   19.9000  141.1600      14.7        89       892        91
VIS    2025250     20200   19.8900  141.1000      14.7        87       895        91
VIS    2025250     20200   19.9000  141.0900      14.3        89       870        90
VIS    2025250     20200   19.9000  141.0500      12.6        87       884        91
VIS    2025250     20200   19.9000  141.0100      14.5        86       940        98
VIS    2025250     20200   19.8800  140.6200      14.7        82       926        91
VIS    2025250     20200   19.8900  140.5900      14.4        86       926        93
VIS    2025250     20200   19.9000  140.5700      14.5        85       926        91
VIS    2025250     20200   19.9000  140.5600      14.7        83       926        90
VIS    2025250     20200   19.9500  149.8700       4.5        73       950        98
VIS    2025250     20200   19.9000  146.7100       8.5        65       971        91
VIS    2025250     20200   19.9100  146.6700       8.3        64       955        92
VIS    2025250     20200   19.9100  146.6600       8.2        65       955        94
VIS    2025250     20200   19.9100  146.6200       7.7        63       921        96
VIS    2025250     20200   19.9100  146.6100       7.8        62       921        93
VIS    2025250     20200   19.9100  146.0300       9.5        51       972        93
VIS    2025250     20200   19.9000  146.0100       9.5        52       972        95
VIS    2025250     20200   19.9000  145.9900       8.9        54       973        96
VIS    2025250     20200   19.9000  145.4600       9.3        81       942        93
VIS    2025250     20200   19.9100  145.4400       9.2        82       937        93
VIS    2025250     20200   19.9100  145.4200       9.0        83       930        94
VIS    2025250     20200   19.9000  145.4000       8.9        83       919        94
VIS    2025250     20200   19.9100  145.3800       8.8        84       918        95
VIS    2025250     20200   19.9000  145.3600       8.5        84       920        95
VIS    2025250     20200   19.8900  145.3100       8.8        82       923        95
VIS    2025250     20200   19.8900  145.2900       9.1        83       920        96
VIS    2025250     20200   19.8900  145.2800       9.1        82       918        97
VIS    2025250     20200   19.8900  145.2600       9.1        80       914        97
VIS    2025250     20200   19.8900  145.2200       9.5        71       842        92
VIS    2025250     20200   19.8800  145.2000       9.8        67       844        90
VIS    2025250     20200   19.9000  145.1300       9.9        66       849        90
VIS    2025250     20200   19.9000  145.1100      10.2        67       858        92
VIS    2025250     20200   19.9000  145.0800      10.1        74       904        92
VIS    2025250     20200   19.9000  145.0500       9.8        63       939        99
VIS    2025250     20200   19.9000  145.0200       9.9        56       920        95
VIS    2025250     20200   19.8900  145.0000      10.1        60       919        97
VIS    2025250     20200   19.8900  144.9900       9.7        67       885        96
VIS    2025250     20200   19.8900  144.9600       9.3        73       866        94
VIS    2025250     20200   19.8900  144.9300       9.5        70       866        90
VIS    2025250     20200   19.8800  144.9100       9.3        68       901        97
VIS    2025250     20200   19.8900  144.8700       9.2        70       905        99
VIS    2025250     20200   19.8900  144.8700       9.3        70       905        99
VIS    2025250     20200   19.8900  144.6000       9.9        60       972        98
VIS    2025250     20200   19.8900  144.5800       9.7        59       968        98
VIS    2025250     20200   19.9000  144.5600      10.2        55       966        98
VIS    2025250     20200   19.8900  144.5300      10.7        51       963        97
VIS    2025250     20200   19.8900  144.5000      10.3        49       940        96
VIS    2025250     20200   19.9000  144.4800      10.1        49       930        94
VIS    2025250     20200   19.9000  144.4700       9.9        50       930        93
VIS    2025250     20200   19.8900  144.4300      10.1        55       927        91
VIS    2025250     20200   19.8800  144.4000      11.5        57       926        91
VIS    2025250     20200   19.9000  144.3900      11.0        62       927        93
VIS    2025250     20200   19.9000  144.3700      12.0        70       934        97
VIS    2025250     20200   19.8800  144.3300      11.4        70       899        94
VIS    2025250     20200   19.8900  143.6600       9.2        94       891        93
VIS    2025250     20200   19.8900  143.6500       9.3        95       880        95
VIS    2025250     20200   19.8900  143.6200       8.6        89       870        95
VIS    2025250     20200   19.8700  143.5600       8.4       103       859        91
VIS    2025250     20200   19.8800  143.5500       8.6       101       874        94
VIS    2025250     20200   19.8800  143.5300       8.8       102       865        97
VIS    2025250     20200   19.8900  143.4900      10.0       106       851        96
VIS    2025250     20200   19.8700  143.4700      10.3       112       818        95
VIS    2025250     20200   19.8700  143.4500       9.4       110       818        98
VIS    2025250     20200   19.8900  143.4300       8.8        98       803        97
VIS    2025250     20200   19.8700  143.4000       9.1        99       851        94
VIS    2025250     20200   19.8800  143.3600       8.9        99       851        94
VIS    2025250     20200   19.8700  143.3600       9.1       100       851        94
VIS    2025250     20200   19.8900  143.2500       9.9       106       809        99
VIS    2025250     20200   19.8800  143.2300       9.0        94       769        95
VIS    2025250     20200   19.8900  143.2000       9.3        98       771        96
VIS    2025250     20200   19.8700  143.0400       9.6        96       740        96
VIS    2025250     20200   19.8700  143.0100       9.4        97       778        97
VIS    2025250     20200   19.8900  142.9800       8.5        94       844        92
VIS    2025250     20200   19.8900  142.9500       9.4        93       835        93
VIS    2025250     20200   19.8800  142.8100      11.4        82       898        96
VIS    2025250     20200   19.8700  142.7800      11.3        88       862        97
VIS    2025250     20200   19.8900  142.7600      10.6        92       855        98
VIS    2025250     20200   19.8900  142.7100      11.6        89       845        90
VIS    2025250     20200   19.8900  142.6800      11.2        90       841        92
VIS    2025250     20200   19.8700  142.6700      10.6        99       832        94
VIS    2025250     20200   19.8800  142.6400      10.8        98       816        97
VIS    2025250     20200   19.8800  142.6100      11.3        98       809        97
VIS    2025250     20200   19.8800  142.5800      11.4       100       798        97
VIS    2025250     20200   19.8800  142.5600      11.2       104       783        97
VIS    2025250     20200   19.8700  142.5500      11.8       103       783        96
VIS    2025250     20200   19.8700  142.5300      12.9        96       834        91
VIS    2025250     20200   19.8600  142.4300      14.4        79       878        91
VIS    2025250     20200   19.8700  142.4100      14.8        83       872        91
VIS    2025250     20200   19.8600  142.3900      14.9        84       872        90
VIS    2025250     20200   19.8800  142.3600      14.9        89       872        93
VIS    2025250     20200   19.8700  142.2700      13.6        83       900        96
VIS    2025250     20200   19.8800  142.2500      14.1        77       900        93
VIS    2025250     20200   19.8800  142.2200      14.9        77       897        91
VIS    2025250     20200   19.8800  142.2100      14.9        78       897        92
VIS    2025250     20200   19.8800  142.1700      13.9        84       885        93
VIS    2025250     20200   19.8800  142.1600      13.8        84       885        94
VIS    2025250     20200   19.8800  142.1000      14.4        83       880        92
VIS    2025250     20200   19.8700  142.0900      14.9        84       877        91
VIS    2025250     20200   19.8600  142.0600      14.9        90       882        90
VIS    2025250     20200   19.8700  142.0200      14.7       109       889        95
VIS    2025250     20200   19.8700  141.9800      16.0        96       897        91
VIS    2025250     20200   19.8800  141.9000      13.2       103       920        98
VIS    2025250     20200   19.8600  141.8800      14.4        84       913        97
VIS    2025250     20200   19.8700  141.8500      13.6        88       897        97
VIS    2025250     20200   19.8700  141.8400      13.9        81       895        93
VIS    2025250     20200   19.8800  141.8200      14.4        80       888        92
VIS    2025250     20200   19.8700  141.7900      14.9        81       888        92
VIS    2025250     20200   19.8700  141.7600      14.9        89       882        90
VIS    2025250     20200   19.8700  141.7500      15.2        92       880        94
VIS    2025250     20200   19.8800  141.7200      14.9        89       879        92
VIS    2025250     20200   19.8800  141.6800      13.2        97       882        94
VIS    2025250     20200   19.8800  141.6500      12.2       103       882        99
VIS    2025250     20200   19.8700  141.6300      11.4        99       876        99
VIS    2025250     20200   19.8700  141.6300      11.0        99       875        99
VIS    2025250     20200   19.8800  141.5800      11.8       107       871        96
VIS    2025250     20200   19.8600  141.5600      13.7        99       869        96
VIS    2025250     20200   19.8600  141.5300      13.8        93       870        93
VIS    2025250     20200   19.8600  141.5100      12.5        96       870        96
VIS    2025250     20200   19.8700  141.4900      12.2        98       885        91
VIS    2025250     20200   19.8700  141.4700      12.5        92       885        96
VIS    2025250     20200   19.8600  141.4400      15.0        96       868        93
VIS    2025250     20200   19.8700  141.3100      13.6        85       900        93
VIS    2025250     20200   19.8800  141.3100      13.6        85       898        92
VIS    2025250     20200   19.8700  141.2700      13.7        91       898        96
VIS    2025250     20200   19.8600  141.2600      13.6        84       897        90
VIS    2025250     20200   19.8600  141.2200      13.5        91       904        91
VIS    2025250     20200   19.8800  141.2100      14.1        90       904        94
VIS    2025250     20200   19.8600  141.1700      14.1        86       902        90
VIS    2025250     20200   19.8800  141.1500      14.9        85       896        90
VIS    2025250     20200   19.8600  141.0000      15.2        82       940        98
VIS    2025250     20200   19.8800  140.6000      14.9        86       926        93
VIS    2025250     20200   19.8600  140.5600      15.2        92       902        90
VIS    2025250     20200   19.8700  140.5500      14.9        89       908        91
VIS    2025250     20200   19.8600  140.5200      13.6        90       897        92
VIS    2025250     20200   19.8600  140.5100      14.2        87       897        90
VIS    2025250     20200   19.8900  146.6400       7.9        62       926        97
VIS    2025250     20200   19.8800  146.1500       8.9        57       982        98
VIS    2025250     20200   19.8700  145.4500       9.0        80       941        95
VIS    2025250     20200   19.8600  145.4200       8.9        82       929        96
VIS    2025250     20200   19.8800  145.4000       8.8        83       923        96
VIS    2025250     20200   19.8600  145.3700       8.6        82       920        97
VIS    2025250     20200   19.8800  145.3700       8.6        82       920        96
VIS    2025250     20200   19.8800  145.3400       8.5        81       923        97
VIS    2025250     20200   19.8700  145.3000       8.7        83       920        96
VIS    2025250     20200   19.8600  145.2900       8.6        80       918        98
VIS    2025250     20200   19.8800  145.2700       9.1        79       916        98
VIS    2025250     20200   19.8600  145.1500      10.3        65       905        96
VIS    2025250     20200   19.8800  145.1100      10.3        65       905        96
VIS    2025250     20200   19.8600  145.0900       9.8        68       918        98
VIS    2025250     20200   19.8600  145.0700      10.9        76       922        96
VIS    2025250     20200   19.8600  145.0500      11.0        73       938        98
VIS    2025250     20200   19.8600  145.0100       9.7        63       926        95
VIS    2025250     20200   19.8600  144.9800       9.8        63       894        92
VIS    2025250     20200   19.8800  144.9700       9.6        70       880        93
VIS    2025250     20200   19.8600  144.9500       9.4        70       882        93
VIS    2025250     20200   19.8700  144.9200       9.3        69       901        98
VIS    2025250     20200   19.8800  144.8800       9.2        67       905        99
VIS    2025250     20200   19.8700  144.8700       9.5        67       927        99
VIS    2025250     20200   19.8500  144.6500      11.4        61       992        97
VIS    2025250     20200   19.8500  144.6400      11.3        62       992        97
VIS    2025250     20200   19.8700  144.6300      10.9        61       992        99
VIS    2025250     20200   19.8700  144.5900       9.5        64       981        96
VIS    2025250     20200   19.8500  144.5700      10.7        62       969        95
VIS    2025250     20200   19.8700  144.5500      10.7        59       966        96
VIS    2025250     20200   19.8500  144.5100       9.8        60       931        95
VIS    2025250     20200   19.8500  144.5000       9.8        60       924        95
VIS    2025250     20200   19.8500  144.4600      10.3        58       924        95
VIS    2025250     20200   19.8700  144.4000      11.3        57       926        93
VIS    2025250     20200   19.8600  143.6700       9.1        95       894        91
VIS    2025250     20200   19.8500  143.6500       8.8       101       880        91
VIS    2025250     20200   19.8600  143.6300       8.6        98       870        92
VIS    2025250     20200   19.8500  143.5800       9.0        95       851        95
VIS    2025250     20200   19.8600  143.5600       9.1       100       859        95
VIS    2025250     20200   19.8600  143.5300       9.9       107       841        99
VIS    2025250     20200   19.8600  143.5100      10.5       112       827        96
VIS    2025250     20200   19.8600  143.4600      10.5       119       827        91
VIS    2025250     20200   19.8500  143.4200       9.1       106       845        92
VIS    2025250     20200   19.8700  143.4000       9.1        99       851        94
VIS    2025250     20200   19.8500  143.3800       9.2       101       794        99
VIS    2025250     20200   19.8500  143.3700       9.2       101       783        98
VIS    2025250     20200   19.8400  143.3200      10.4       106       739        97
VIS    2025250     20200   19.8500  143.3200      10.3       107       739        96
VIS    2025250     20200   19.8600  143.2800       9.6       118       761        94
VIS    2025250     20200   19.8500  143.0300       9.6        97       740        93
VIS    2025250     20200   19.8600  143.0100       9.4        97       778        97
VIS    2025250     20200   19.8400  142.9800       8.4       108       807        95
VIS    2025250     20200   19.8600  142.9700       8.9        98       836        96
VIS    2025250     20200   19.8500  142.8200      10.8        82       886        91
VIS    2025250     20200   19.8600  142.8000      10.5        89       871        97
VIS    2025250     20200   19.8500  142.7700      11.1        98       859        92
VIS    2025250     20200   19.8400  142.6900      10.6       103       834        91
VIS    2025250     20200   19.8600  142.6700      10.5       100       832        93
VIS    2025250     20200   19.8500  142.6400      10.8        95       808        97
VIS    2025250     20200   19.8600  142.6300      10.7        94       809        97
VIS    2025250     20200   19.8500  142.5900      11.2       103       802        97
VIS    2025250     20200   19.8600  142.5800      11.4       102       798        97
VIS    2025250     20200   19.8500  142.5500      11.7       105       798        97
VIS    2025250     20200   19.8400  142.5200      12.4       100       823        96
VIS    2025250     20200   19.8500  142.4900      12.6        80       859        90
VIS    2025250     20200   19.8600  142.4300      14.4        78       878        91
VIS    2025250     20200   19.8600  142.2400      14.9        72       897        91
VIS    2025250     20200   19.8500  142.1800      14.5        80       880        91
VIS    2025250     20200   19.8500  142.1700      13.6        82       880        92
VIS    2025250     20200   19.8400  142.1300      10.4        93       884        96
VIS    2025250     20200   19.8500  142.0300      13.5       101       894        99
VIS    2025250     20200   19.8400  142.0200      12.6       100       894        93
VIS    2025250     20200   19.8400  141.9900      15.8        92       892        94
VIS    2025250     20200   19.8400  141.9100      15.5        80       913        91
VIS    2025250     20200   19.8400  141.9000      15.3        78       913        93
VIS    2025250     20200   19.8500  141.8000      15.0        75       894        90
VIS    2025250     20200   19.8600  141.7800      14.6        87       889        94
VIS    2025250     20200   19.8600  141.7000      13.9        89       885        93
VIS    2025250     20200   19.8600  141.6800      12.6        96       885        96
VIS    2025250     20200   19.8400  141.6500      11.3        98       879        99
VIS    2025250     20200   19.8500  141.6300      10.8       100       879        99
VIS    2025250     20200   19.8400  141.6000      12.3        96       839        90
VIS    2025250     20200   19.8300  141.5800      14.1        98       807        90
VIS    2025250     20200   19.8400  141.5600      15.3        93       869        92
VIS    2025250     20200   19.8400  141.5300      13.7        92       869        94
VIS    2025250     20200   19.8300  141.5100      13.4        97       860        95
VIS    2025250     20200   19.8500  141.4600      13.8        96       874        96
VIS    2025250     20200   19.8400  141.3500      13.8        88       906        91
VIS    2025250     20200   19.8500  141.3200      14.5        88       904        95
VIS    2025250     20200   19.8500  141.3200      14.5        87       904        95
VIS    2025250     20200   19.8500  141.2500      13.4        83       898        91
VIS    2025250     20200   19.8500  141.0100      14.9        84       940        99
VIS    2025250     20200   19.8400  140.9900      13.5        80       969        96
VIS    2025250     20200   19.8300  140.9500      11.8        90       964        90
VIS    2025250     20200   19.8300  140.9100      12.0        91       960        94
VIS    2025250     20200   19.8500  140.8900      13.2        87       961        96
VIS    2025250     20200   19.8500  140.6500      10.8        88       886        92
VIS    2025250     20200   19.8400  140.6300      11.3        88       886        91
VIS    2025250     20200   19.8500  140.5800      15.0        90       902        90
VIS    2025250     20200   19.8400  140.5500      12.2       101       897        98
VIS    2025250     20200   19.8300  140.5300      12.2        95       895        95
VIS    2025250     20200   19.8400  140.5100      13.8        89       897        91
VIS    2025250     20200   19.8700  146.6600       8.3        59       956        91
VIS    2025250     20200   19.8500  146.6100       8.7        58       959        91
VIS    2025250     20200   19.8600  146.0900       8.8        54       973        96
VIS    2025250     20200   19.8500  145.4400       8.9        81       941        95
VIS    2025250     20200   19.8500  145.4300       8.8        82       929        96
VIS    2025250     20200   19.8500  145.4000       8.7        83       923        97
VIS    2025250     20200   19.8600  145.3800       8.6        83       923        97
VIS    2025250     20200   19.8400  145.3500       8.9        81       920        97
VIS    2025250     20200   19.8500  145.3300       8.9        79       920        98
VIS    2025250     20200   19.8400  145.3100       9.2        75       917        99
VIS    2025250     20200   19.8400  145.2800       9.4        72       916        99
VIS    2025250     20200   19.8300  145.2500       9.5        68       914        97
VIS    2025250     20200   19.8500  145.1700      10.4        60       869        90
VIS    2025250     20200   19.8500  145.1400      10.4        65       906        96
VIS    2025250     20200   19.8300  145.1100      10.5        60       928        98
VIS    2025250     20200   19.8500  145.0700      10.8        74       918        96
VIS    2025250     20200   19.8400  145.0600      11.0        74       922        97
VIS    2025250     20200   19.8300  145.0200       9.6        74       926        95
VIS    2025250     20200   19.8500  145.0000       9.7        64       926        95
VIS    2025250     20200   19.8500  144.9800       9.7        63       901        91
VIS    2025250     20200   19.8500  144.9500       9.4        69       894        94
VIS    2025250     20200   19.8400  144.9400       9.7        63       901        97
VIS    2025250     20200   19.8500  144.9100       9.4        70       920       100
VIS    2025250     20200   19.8500  144.8900       9.3        69       927       100
VIS    2025250     20200   19.8400  144.8500       9.6        68       946        99
VIS    2025250     20200   19.8300  144.8400       9.7        66       948        99
VIS    2025250     20200   19.8400  144.6500      11.6        62       992        97
VIS    2025250     20200   19.8500  144.6400      11.4        62       992        97
VIS    2025250     20200   19.8300  144.6200      11.9        56       991        98
VIS    2025250     20200   19.8300  144.5700      10.7        59       965        97
VIS    2025250     20200   19.8500  144.5700      10.7        61       967        93
VIS    2025250     20200   19.8300  144.5300      10.3        56       916        92
VIS    2025250     20200   19.8500  144.5000       9.9        60       924        94
VIS    2025250     20200   19.8400  144.4900      10.1        60       908        93
VIS    2025250     20200   19.8500  144.4600      10.3        59       924        96
VIS    2025250     20200   19.8500  144.4500      10.2        59       931        94
VIS    2025250     20200   19.8300  144.4200       9.5        70       917        93
VIS    2025250     20200   19.8300  143.6700       9.9       109       882        93
VIS    2025250     20200   19.8400  143.6700       9.5       108       882        92
VIS    2025250     20200   19.8200  143.6400       9.2       109       824        98
VIS    2025250     20200   19.8200  143.6000       9.0        99       824        98
VIS    2025250     20200   19.8200  143.5900       8.9        99       824        98
VIS    2025250     20200   19.8400  143.5600       9.7       103       816        98
VIS    2025250     20200   19.8400  143.5400      10.2       107       816        98
VIS    2025250     20200   19.8200  143.5100      10.7       117       816        95
VIS    2025250     20200   19.8300  143.4700      10.2       118       802        95
VIS    2025250     20200   19.8300  143.4300       8.9       106       845        91
VIS    2025250     20200   19.8300  143.4200       9.0       103       796        98
VIS    2025250     20200   19.8400  143.3900       9.3       102       789       100
VIS    2025250     20200   19.8300  143.3600       9.8       104       751       100
VIS    2025250     20200   19.8300  143.3400      10.4       106       743        98
VIS    2025250     20200   19.8400  143.3200      10.4       105       739        98
VIS    2025250     20200   19.8400  143.3000      10.2       108       728        98
VIS    2025250     20200   19.8300  143.0100       9.0       108       700        94
VIS    2025250     20200   19.8200  142.9600       9.7       105       790        94
VIS    2025250     20200   19.8300  142.8400       9.8        83       891        92
VIS    2025250     20200   19.8300  142.8300      10.5        84       876        91
VIS    2025250     20200   19.8300  142.8000      10.7        95       863        95
VIS    2025250     20200   19.8400  142.7700      11.1        98       859        94
VIS    2025250     20200   19.8300  142.7200      11.0        93       849        92
VIS    2025250     20200   19.8200  142.7000      10.9       102       840        93
VIS    2025250     20200   19.8400  142.6900      10.8       104       834        92
VIS    2025250     20200   19.8300  142.6500      11.5        99       805        97
VIS    2025250     20200   19.8300  142.6400      11.3        96       805        97
VIS    2025250     20200   19.8300  142.6200      10.9        92       805        96
VIS    2025250     20200   19.8300  142.5700      12.3       108       791        92
VIS    2025250     20200   19.8200  142.5700      12.1       108       795        91
VIS    2025250     20200   19.8300  142.5300      11.8       104       807        98
VIS    2025250     20200   19.8300  142.5200      12.1       102       823        96
VIS    2025250     20200   19.8200  142.3400      14.7        85       859        90
VIS    2025250     20200   19.8300  142.1900      14.9        80       880        91
VIS    2025250     20200   19.8300  142.1300      10.8        93       885        92
VIS    2025250     20200   19.8300  142.1300      10.4        93       885        93
VIS    2025250     20200   19.8200  142.0900      13.3        85       883        95
VIS    2025250     20200   19.8200  142.0800      14.8        89       883        95
VIS    2025250     20200   19.8100  142.0600      14.7        94       889        93
VIS    2025250     20200   19.8100  142.0300      13.8       103       895        92
VIS    2025250     20200   19.8100  141.9900      16.1        89       892        94
VIS    2025250     20200   19.8300  141.9700      15.9        83       894        92
VIS    2025250     20200   19.8100  141.9600      15.3        83       897        94
VIS    2025250     20200   19.8100  141.9200      15.9        77       930        95
VIS    2025250     20200   19.8300  141.9100      16.0        79       925        92
VIS    2025250     20200   19.8200  141.8800      16.1        77       904        91
VIS    2025250     20200   19.8300  141.7900      15.5        76       894        90
VIS    2025250     20200   19.8300  141.6700      12.5        92       883        97
VIS    2025250     20200   19.8300  141.6200      11.3       101       866        90
VIS    2025250     20200   19.8100  141.5700      13.3       102       793        90
VIS    2025250     20200   19.8100  141.5700      13.2       102       793        91
VIS    2025250     20200   19.8300  141.5300      13.6        88       859        90
VIS    2025250     20200   19.8100  141.4500      12.6       115       878        91
VIS    2025250     20200   19.8100  141.4400      11.9       115       878        91
VIS    2025250     20200   19.8200  141.4000      12.2       103       895        94
VIS    2025250     20200   19.8100  141.3600      14.6        82       911        93
VIS    2025250     20200   19.8100  141.3500      14.7        83       911        93
VIS    2025250     20200   19.8200  141.3200      14.5        87       900        95
VIS    2025250     20200   19.8100  141.1000      14.9        74       940        95
VIS    2025250     20200   19.8100  141.0800      13.9        79       933        95
VIS    2025250     20200   19.8100  141.0500      14.7        84       953        96
VIS    2025250     20200   19.8100  141.0200      14.9        84       953        98
VIS    2025250     20200   19.8100  141.0100      14.4        82       953        96
VIS    2025250     20200   19.8100  140.9800      11.9        84       949        95
VIS    2025250     20200   19.8100  140.9500      12.6        89       949        97
VIS    2025250     20200   19.8200  140.9300      11.8        92       949        95
VIS    2025250     20200   19.8100  140.8900      13.6        86       936        99
VIS    2025250     20200   19.8200  140.8700      13.9        87       936        97
VIS    2025250     20200   19.8100  140.8400      13.7        88       902        93
VIS    2025250     20200   19.8300  140.6300      10.1        94       886        93
VIS    2025250     20200   19.8100  140.5600      11.8        96       894        96
VIS    2025250     20200   19.8300  140.5300      11.8        96       895        96
VIS    2025250     20200   19.8300  140.5300      12.2        94       895        95
VIS    2025250     20200   19.8600  149.1500       5.4        72       950        97
VIS    2025250     20200   19.8500  149.1400       5.5        74       950        98
VIS    2025250     20200   19.8400  146.6100       8.6        58       961        91
VIS    2025250     20200   19.8300  146.5900       8.2        58       959        95
VIS    2025250     20200   19.8400  146.5600       8.2        59       959        95
VIS    2025250     20200   19.8300  146.5300       8.4        57       968        96
VIS    2025250     20200   19.8200  146.1500       9.3        55       990        91
VIS    2025250     20200   19.8300  145.4200       8.9        82       930        95
VIS    2025250     20200   19.8300  145.4100       8.8        83       926        96
VIS    2025250     20200   19.8100  145.3800       8.5        84       918        96
VIS    2025250     20200   19.8200  145.3500       9.0        82       919        96
VIS    2025250     20200   19.8300  145.3500       9.0        82       919        97
VIS    2025250     20200   19.8100  145.3000       9.6        70       915        99
VIS    2025250     20200   19.8200  145.2800       9.6        67       916        99
VIS    2025250     20200   19.8200  145.2700       9.6        67       916        99
VIS    2025250     20200   19.8200  145.1400      11.1        56       921        95
VIS    2025250     20200   19.8300  145.1000      10.7        59       928        97
VIS    2025250     20200   19.8100  145.1000      11.1        56       928        96
VIS    2025250     20200   19.8300  145.0800      10.9        65       922        96
VIS    2025250     20200   19.8200  145.0300       9.5        76       922        99
VIS    2025250     20200   19.8200  145.0300       9.5        77       922        97
VIS    2025250     20200   19.8200  144.9800       9.3        66       914        95
VIS    2025250     20200   19.8100  144.9700       9.3        62       923        93
VIS    2025250     20200   19.8100  144.9400      10.3        55       910        94
VIS    2025250     20200   19.8100  144.9200      10.4        57       910        95
VIS    2025250     20200   19.8100  144.8800       9.6        71       927        99
VIS    2025250     20200   19.8100  144.8600       9.7        71       948        98
VIS    2025250     20200   19.8100  144.8500       9.7        71       948        98
VIS    2025250     20200   19.8200  144.8300      10.6        60       948        95
VIS    2025250     20200   19.8200  144.6200      11.5        53       991        93
VIS    2025250     20200   19.8000  144.6000      11.1        54       967        96
VIS    2025250     20200   19.8000  144.5900      11.1        54       965        96
VIS    2025250     20200   19.8000  144.5500      10.7        54       918        93
VIS    2025250     20200   19.8200  144.5300      10.4        55       913        90
VIS    2025250     20200   19.8100  144.4300      10.0        74       917        91
VIS    2025250     20200   19.8100  143.6800      10.8       109       851        98
VIS    2025250     20200   19.8000  143.6600       9.0       107       791        99
VIS    2025250     20200   19.8000  143.6400       8.7       101       792        98
VIS    2025250     20200   19.8200  143.6000       9.0       100       819        98
VIS    2025250     20200   19.8200  143.5900       8.9       100       819        98
VIS    2025250     20200   19.8200  143.5600       9.1        99       810        96
VIS    2025250     20200   19.8000  143.5300      10.3       104       816        99
VIS    2025250     20200   19.8000  143.5100      10.4       109       816        99
VIS    2025250     20200   19.8100  143.4900       9.9       111       802        99
VIS    2025250     20200   19.8100  143.4700       9.7       109       802        97
VIS    2025250     20200   19.8100  143.4300       8.9       104       796        97
VIS    2025250     20200   19.8200  143.4100       9.2       104       756       100
VIS    2025250     20200   19.8000  143.3900      10.0       108       744        99
VIS    2025250     20200   19.8100  143.3600       9.9       105       744       100
VIS    2025250     20200   19.8100  143.3500      10.1       106       743        99
VIS    2025250     20200   19.8100  143.3200      10.4       104       743        98
VIS    2025250     20200   19.8000  142.8600       8.7        96       894        90
VIS    2025250     20200   19.8000  142.8300      10.0        86       901        92
VIS    2025250     20200   19.8100  142.7900      10.6        94       863        92
VIS    2025250     20200   19.8100  142.7900      10.6        94       863        92
VIS    2025250     20200   19.8100  142.7000      10.7        98       840        95
VIS    2025250     20200   19.8000  142.6700      11.2       105       812        98
VIS    2025250     20200   19.7900  142.6600      11.3       104       810        98
VIS    2025250     20200   19.7900  142.6300      10.3       100       817        99
VIS    2025250     20200   19.7900  142.6000      11.5        99       813        94
VIS    2025250     20200   19.7900  142.5900      11.7        99       813        92
VIS    2025250     20200   19.8100  142.5500      10.5       105       816       100
VIS    2025250     20200   19.8000  142.5300      10.6       102       816       100
VIS    2025250     20200   19.8000  142.5000      12.2       102       830        98
VIS    2025250     20200   19.8100  142.4900      12.6       101       830        97
VIS    2025250     20200   19.7900  142.4600      12.4        91       828        94
VIS    2025250     20200   19.7900  142.4500      12.8        89       828        93
VIS    2025250     20200   19.7900  142.1300      13.9        85       883        91
VIS    2025250     20200   19.7900  142.1300      13.7        86       883        92
VIS    2025250     20200   19.7900  142.0900      14.0        88       883        94
VIS    2025250     20200   19.8000  142.0200      13.5        99       895        95
VIS    2025250     20200   19.8000  141.9900      15.5        90       892        95
VIS    2025250     20200   19.7900  141.9600      14.6        84       891        93
VIS    2025250     20200   19.7900  141.9600      14.3        83       889        93
VIS    2025250     20200   19.8100  141.9200      15.7        76       925        93
VIS    2025250     20200   19.7900  141.9000      16.3        75       930        93
VIS    2025250     20200   19.8000  141.8800      16.5        78       904        91
VIS    2025250     20200   19.7900  141.6800      13.8        94       878        94
VIS    2025250     20200   19.8000  141.6500      12.1        96       812        93
VIS    2025250     20200   19.7900  141.6200      12.3        96       810        91
VIS    2025250     20200   19.7800  141.5500      12.6       106       837        94
VIS    2025250     20200   19.7900  141.5400      12.2       102       793        93
VIS    2025250     20200   19.7800  141.4500      13.1        94       883        92
VIS    2025250     20200   19.7800  141.4200      12.8        87       895        94
VIS    2025250     20200   19.8000  141.3300      14.9        84       896        92
VIS    2025250     20200   19.7800  141.0600      13.8        84       927        95
VIS    2025250     20200   19.7800  141.0600      14.1        84       927        94
VIS    2025250     20200   19.8000  141.0200      14.6        85       911        92
VIS    2025250     20200   19.8000  141.0100      14.1        84       927        93
VIS    2025250     20200   19.8000  140.9900      12.0        85       949        94
VIS    2025250     20200   19.8000  140.9500      12.6        91       919        98
VIS    2025250     20200   19.7900  140.9200      14.0        93       914        98
VIS    2025250     20200   19.8000  140.9000      13.9        90       922        98
VIS    2025250     20200   19.7900  140.8900      14.3        87       911        94
VIS    2025250     20200   19.8000  140.8500      13.8        88       902        93
VIS    2025250     20200   19.7900  140.8400      14.3        89       902        93
VIS    2025250     20200   19.7800  140.8000      13.5        88       901        91
VIS    2025250     20200   19.7800  140.5900      11.0       112       889        98
VIS    2025250     20200   19.7900  140.5700      11.9       102       889        98
VIS    2025250     20200   19.8000  140.5400      11.6        95       894        95
VIS    2025250     20200   19.8400  149.0900       4.9        61       947        96
VIS    2025250     20200   19.8000  146.6000       8.1        56       943        92
VIS    2025250     20200   19.8100  146.5800       8.1        60       943        95
VIS    2025250     20200   19.8100  146.5500       7.7        59       937       100
VIS    2025250     20200   19.8000  146.5400       7.6        53       932        98
VIS    2025250     20200   19.8000  145.4400       9.4        80       960        92
VIS    2025250     20200   19.8000  145.4300       9.4        79       930        95
VIS    2025250     20200   19.8100  145.4000       8.9        80       922        97
VIS    2025250     20200   19.8000  145.3800       8.6        82       918        97
VIS    2025250     20200   19.8100  145.3500       9.0        82       918        96
VIS    2025250     20200   19.8000  145.3200       9.6        75       916        98
VIS    2025250     20200   19.8000  145.3000       9.6        70       915        99
VIS    2025250     20200   19.8000  145.2600       9.4        66       915        99
VIS    2025250     20200   19.7900  145.2600       9.5        65       915        99
VIS    2025250     20200   19.8000  145.0500       9.4        67       922        92
VIS    2025250     20200   19.7900  145.0400       9.4        66       922        94
VIS    2025250     20200   19.8000  145.0000       9.2        75       917        97
VIS    2025250     20200   19.7800  144.9700       9.2        63       941        96
VIS    2025250     20200   19.7900  144.9500      10.1        55       910        93
VIS    2025250     20200   19.7800  144.9300      10.4        55       906        91
VIS    2025250     20200   19.8000  144.9000       9.9        64       915        98
VIS    2025250     20200   19.7900  144.8900       9.7        65       921        99
VIS    2025250     20200   19.8000  144.8500       9.7        71       948        98
VIS    2025250     20200   19.7800  144.6200      11.3        50       991        95
VIS    2025250     20200   19.7800  144.5900      10.9        50       952        96
VIS    2025250     20200   19.7800  144.5800      10.8        51       938        95
VIS    2025250     20200   19.8000  144.5500      10.7        54       918        93
VIS    2025250     20200   19.7800  144.5300      10.5        54       903        90
VIS    2025250     20200   19.7800  144.5000       9.9        55       904        92
VIS    2025250     20200   19.7800  144.4400      10.8        67       920        93
VIS    2025250     20200   19.7700  143.7400      11.2       103       791        96
VIS    2025250     20200   19.7800  143.7100      11.5       101       786        95
VIS    2025250     20200   19.7800  143.6900      10.4       105       779        99
VIS    2025250     20200   19.7800  143.6800      10.0       104       775        99
VIS    2025250     20200   19.7800  143.6400       8.8       102       773        99
VIS    2025250     20200   19.7700  143.6300       9.1       101       773       100
VIS    2025250     20200   19.7800  143.5900       8.9       102       811        99
VIS    2025250     20200   19.7700  143.5600       8.9       105       803        99
VIS    2025250     20200   19.7700  143.5400       9.9       105       810        99
VIS    2025250     20200   19.7800  143.5300      10.4       103       814        99
VIS    2025250     20200   19.7900  143.4900       9.8       102       802        99
VIS    2025250     20200   19.7700  143.4600      10.0       102       796        96
VIS    2025250     20200   19.7700  143.4400       9.8       106       775        96
VIS    2025250     20200   19.7800  143.4300       9.6       106       758        99
VIS    2025250     20200   19.7800  143.4100       9.8       107       747       100
VIS    2025250     20200   19.7900  143.3900      10.0       108       744        99
VIS    2025250     20200   19.7800  143.3600       9.9       106       747        99
VIS    2025250     20200   19.7900  143.3400       9.7       103       755        98
VIS    2025250     20200   19.7700  142.8500      12.8        78       919        94
VIS    2025250     20200   19.7900  142.8000      12.3        77       887        94
VIS    2025250     20200   19.7800  142.7100      10.2        89       836        92
VIS    2025250     20200   19.7800  142.7000       9.8        92       833        90
VIS    2025250     20200   19.7800  142.6700      10.1        99       812        99
VIS    2025250     20200   19.7700  142.6500       9.4        96       817        98
VIS    2025250     20200   19.7900  142.6300      10.0       100       817        99
VIS    2025250     20200   19.7900  142.6000      11.2        99       813        95
VIS    2025250     20200   19.7900  142.5800      12.0       101       817        92
VIS    2025250     20200   19.7800  142.5400      10.3        94       845        97
VIS    2025250     20200   19.7700  142.4900      10.9        95       841        93
VIS    2025250     20200   19.7700  142.4600      12.0        92       806        94
VIS    2025250     20200   19.7700  142.4500      12.7        90       804        92
VIS    2025250     20200   19.7700  142.4200      13.8        95       830        94
VIS    2025250     20200   19.7700  142.4000      14.8        94       857        93
VIS    2025250     20200   19.7700  142.3700      14.8        80       866        90
VIS    2025250     20200   19.7800  142.3600      14.7        79       866        90
VIS    2025250     20200   19.7800  142.3400      14.8        80       866        90
VIS    2025250     20200   19.7800  142.3000      15.4        78       883        90
VIS    2025250     20200   19.7800  142.2600      14.7        81       868        91
VIS    2025250     20200   19.7800  142.1300      14.1        85       883        90
VIS    2025250     20200   19.7800  142.1000      15.0        88       882        93
VIS    2025250     20200   19.7700  142.0900      15.7        89       882        92
VIS    2025250     20200   19.7800  142.0400      13.3        91       895        90
VIS    2025250     20200   19.7600  142.0100      14.6        81       890        91
VIS    2025250     20200   19.7600  141.9800      15.1        84       889        92
VIS    2025250     20200   19.7700  141.9500      14.3        83       889        94
VIS    2025250     20200   19.7600  141.9500      14.2        82       889        92
VIS    2025250     20200   19.7600  141.9100      15.8        74       920        91
VIS    2025250     20200   19.7800  141.8800      16.6        78       897        90
VIS    2025250     20200   19.7700  141.7700      15.6        86       889        90
VIS    2025250     20200   19.7700  141.6900      14.9        89       882        92
VIS    2025250     20200   19.7800  141.6800      14.1        92       882        90
VIS    2025250     20200   19.7700  141.6400      12.0        96       811        91
VIS    2025250     20200   19.7700  141.6300      12.4        94       812        92
VIS    2025250     20200   19.7800  141.5500      12.7       110       874        92
VIS    2025250     20200   19.7800  141.5300      12.8       104       874        98
VIS    2025250     20200   19.7700  141.0600      13.1        89       911        94
VIS    2025250     20200   19.7700  141.0300      13.9        90       911        96
VIS    2025250     20200   19.7700  141.0200      13.8        90       911        96
VIS    2025250     20200   19.7700  140.9900      11.7        97       904        98
VIS    2025250     20200   19.7700  140.9700      11.8        98       895        99
VIS    2025250     20200   19.7700  140.9500      12.4        95       895        97
VIS    2025250     20200   19.7600  140.9100      13.1        93       889        94
VIS    2025250     20200   19.7600  140.8800      14.2        89       890        90
VIS    2025250     20200   19.7600  140.8600      14.7        90       892        91
VIS    2025250     20200   19.7700  140.8300      15.6        91       898        91
VIS    2025250     20200   19.7700  140.8300      15.5        90       901        91
VIS    2025250     20200   19.7700  140.7900      13.2        88       901        90
VIS    2025250     20200   19.7700  140.7800      12.9        88       901        90
VIS    2025250     20200   19.7600  140.6600      12.8       101       890        96
VIS    2025250     20200   19.7600  140.6600      12.8       102       890        97
VIS    2025250     20200   19.7600  140.6300      11.9       121       890        97
VIS    2025250     20200   19.7600  140.6000      11.8       122       889        96
VIS    2025250     20200   19.7700  140.5800      11.7       111       883        99
VIS    2025250     20200   19.7600  140.5600      12.0        94       873        91
VIS    2025250     20200   19.8200  149.0800       4.5        61       947        91
VIS    2025250     20200   19.7800  146.6200       8.4        56       943        91
VIS    2025250     20200   19.7900  146.6000       8.0        56       943        95
VIS    2025250     20200   19.7800  146.5800       7.7        56       914        97
VIS    2025250     20200   19.7800  146.5600       7.6        52       914        96
VIS    2025250     20200   19.7900  146.5400       7.7        50       932        97
VIS    2025250     20200   19.7800  146.4300       8.2        53       972        96
VIS    2025250     20200   19.7700  145.4500       9.4        81       956        93
VIS    2025250     20200   19.7700  145.4400       9.6        81       956        94
VIS    2025250     20200   19.7800  145.4100       9.4        80       923        97
VIS    2025250     20200   19.7600  145.3800       9.1        81       915        94
VIS    2025250     20200   19.7800  145.3700       8.7        82       916        95
VIS    2025250     20200   19.7700  145.3300       9.6        72       915       100
VIS    2025250     20200   19.7800  145.3200       9.5        72       916       100
VIS    2025250     20200   19.7800  145.2900       9.3        68       915       100
VIS    2025250     20200   19.7800  145.2700       9.4        65       915        98
VIS    2025250     20200   19.7700  145.2300       9.7        60       880        90
VIS    2025250     20200   19.7600  145.2000      10.1        55       887        91
VIS    2025250     20200   19.7700  145.1900      10.1        55       885        90
VIS    2025250     20200   19.7700  145.1700      10.2        57       892        90
VIS    2025250     20200   19.7600  145.1200      10.5        55       919        90
VIS    2025250     20200   19.7600  145.1000      10.6        58       931        91
VIS    2025250     20200   19.7600  145.0600       9.9        60       935        94
VIS    2025250     20200   19.7800  145.0100       9.5        76       931        97
VIS    2025250     20200   19.7600  144.9800       9.3        67       941        98
VIS    2025250     20200   19.7700  144.9700       9.2        66       941        97
VIS    2025250     20200   19.7800  144.9500      10.0        57       909        94
VIS    2025250     20200   19.7800  144.9200      10.4        56       906        92
VIS    2025250     20200   19.7800  144.8900       9.6        65       921        98
VIS    2025250     20200   19.7700  144.8700       9.4        63       931        97
VIS    2025250     20200   19.7600  144.8500       9.5        59       945        98
VIS    2025250     20200   19.7500  144.6400      12.2        48       996        90
VIS    2025250     20200   19.7600  144.6000      11.2        50       993        96
VIS    2025250     20200   19.7700  144.5800      10.8        50       938        95
VIS    2025250     20200   19.7700  144.5700      10.6        51       927        94
VIS    2025250     20200   19.7700  144.5300      10.6        53       904        90
VIS    2025250     20200   19.7600  144.5100      10.2        54       904        92
VIS    2025250     20200   19.7500  144.4900       9.8        55       904        93
VIS    2025250     20200   19.7700  144.4700      10.0        58       914        93
VIS    2025250     20200   19.7600  144.4400      10.5        69       920        96
VIS    2025250     20200   19.7500  143.7800       9.3       100       807        99
VIS    2025250     20200   19.7700  143.7400      11.1       104       791        97
VIS    2025250     20200   19.7700  143.7300      10.8       104       787        98
VIS    2025250     20200   19.7600  143.6900       9.8       102       772        99
VIS    2025250     20200   19.7500  143.6700       9.3       101       761        99
VIS    2025250     20200   19.7500  143.6400       9.0       104       756       100
VIS    2025250     20200   19.7500  143.6200       9.5       104       755       100
VIS    2025250     20200   19.7500  143.6100       9.6       104       773       100
VIS    2025250     20200   19.7600  143.5800       9.3       106       801        99
VIS    2025250     20200   19.7700  143.5400      10.1       106       808        99
VIS    2025250     20200   19.7700  143.5400      10.4       106       814        99
VIS    2025250     20200   19.7600  143.5000      11.6       102       817        94
VIS    2025250     20200   19.7500  143.4700      10.6       105       791        97
VIS    2025250     20200   19.7600  143.4500      10.0       106       779        96
VIS    2025250     20200   19.7500  143.4200       9.7       107       755       100
VIS    2025250     20200   19.7500  143.4100       9.7       106       751       100
VIS    2025250     20200   19.7600  143.3900      10.1       107       747        99
VIS    2025250     20200   19.7700  143.3500       9.9       105       747        99
VIS    2025250     20200   19.7600  143.3400      10.1       103       741        99
VIS    2025250     20200   19.7500  142.7700      13.0        76       856        91
VIS    2025250     20200   19.7400  142.7500      11.8        84       854        97
VIS    2025250     20200   19.7500  142.7300      11.4        88       836        93
VIS    2025250     20200   19.7400  142.7100       9.9        95       798        92
VIS    2025250     20200   19.7500  142.6700       8.8        89       807        93
VIS    2025250     20200   19.7600  142.6600       9.3        94       812        97
VIS    2025250     20200   19.7500  142.6100       8.8        90       833        95
VIS    2025250     20200   19.7500  142.6100       9.1        91       844        96
VIS    2025250     20200   19.7400  142.5700      11.4        87       870        97
VIS    2025250     20200   19.7500  142.5500      11.2        93       856        96
VIS    2025250     20200   19.7600  142.4700      11.1        92       812        94
VIS    2025250     20200   19.7400  142.4600      12.3        89       806        93
VIS    2025250     20200   19.7400  142.4400      12.0        90       804        91
VIS    2025250     20200   19.7400  142.3900      12.3        97       855        96
VIS    2025250     20200   19.7400  142.3700      12.7        85       858        97
VIS    2025250     20200   19.7400  142.3700      12.7        83       858        97
VIS    2025250     20200   19.7500  142.1000      15.6        87       878        94
VIS    2025250     20200   19.7400  142.0600      15.6        86       882        91
VIS    2025250     20200   19.7600  142.0100      14.2        80       891        93
VIS    2025250     20200   19.7600  141.9800      15.1        83       890        92
VIS    2025250     20200   19.7600  141.9400      14.2        79       891        91
VIS    2025250     20200   19.7600  141.9100      15.6        74       920        92
VIS    2025250     20200   19.7500  141.9000      15.8        76       905        91
VIS    2025250     20200   19.7400  141.8800      16.1        82       890        94
VIS    2025250     20200   19.7400  141.8300      15.8        81       887        93
VIS    2025250     20200   19.7400  141.8300      15.6        80       887        93
VIS    2025250     20200   19.7600  141.7900      15.7        85       891        90
VIS    2025250     20200   19.7500  141.7800      15.8        89       891        92
VIS    2025250     20200   19.7600  141.7500      14.9        90       885        91
VIS    2025250     20200   19.7500  141.6900      15.2        87       882        91
VIS    2025250     20200   19.7400  141.6800      15.3        82       884        91
VIS    2025250     20200   19.7400  141.6400      14.8        80       888        91
VIS    2025250     20200   19.7500  141.6200      13.9        81       886        92
VIS    2025250     20200   19.7400  141.6000      14.9        82       891        92
VIS    2025250     20200   19.7500  141.5400      14.4        92       894        95
VIS    2025250     20200   19.7500  141.5400      14.6        93       894        96
VIS    2025250     20200   19.7400  141.5000      15.9        82       924        95
VIS    2025250     20200   19.7500  141.4900      14.7        83       883        91
VIS    2025250     20200   19.7300  141.0400      12.3       119       892        93
VIS    2025250     20200   19.7500  141.0300      12.6       101       897        93
VIS    2025250     20200   19.7400  141.0000      11.8       108       886        98
VIS    2025250     20200   19.7400  140.9800      11.9       106       879        96
VIS    2025250     20200   19.7300  140.9500      11.6       102       876        92
VIS    2025250     20200   19.7400  140.9200      12.5       102       878        98
VIS    2025250     20200   19.7400  140.9000      13.5       101       889        97
VIS    2025250     20200   19.7400  140.8700      13.9        96       889        95
VIS    2025250     20200   19.7500  140.8400      15.3        94       894        93
VIS    2025250     20200   19.7500  140.8100      15.6        92       894        93
VIS    2025250     20200   19.7500  140.8100      15.3        91       894        92
VIS    2025250     20200   19.7500  140.6500      12.2       105       890        98
VIS    2025250     20200   19.7500  140.6300      12.0       115       890        99
VIS    2025250     20200   19.7500  140.6100      12.2       126       889        95
VIS    2025250     20200   19.7500  140.5700      11.3       105       873        95
VIS    2025250     20200   19.7300  140.5500      12.0        93       877        91
VIS    2025250     20200   19.7400  140.5200      12.3        93       882        92
VIS    2025250     20200   19.7500  140.5000      14.1        91       882        90
VIS    2025250     20200   19.7500  140.4800      14.4        93       885        90
VIS    2025250     20200   19.7400  140.4600      15.3        95       890        90
VIS    2025250     20200   19.7900  150.0300       5.7        29       880        90
VIS    2025250     20200   19.7500  146.6400       9.2        52       966        95
VIS    2025250     20200   19.7600  146.6300       9.1        51       931        90
VIS    2025250     20200   19.7700  146.6100       8.6        53       928        96
VIS    2025250     20200   19.7600  146.5700       7.6        55       914        97
VIS    2025250     20200   19.7500  146.5600       7.9        55       916        97
VIS    2025250     20200   19.7500  146.5200       8.3        48       927        91
VIS    2025250     20200   19.7500  146.4300       8.6        55       972        96
VIS    2025250     20200   19.7500  146.4100       8.7        60       964        97
VIS    2025250     20200   19.7600  145.4300       9.4        81       950        94
VIS    2025250     20200   19.7600  145.4200       9.5        82       927        96
VIS    2025250     20200   19.7500  145.3900       9.3        84       914        94
VIS    2025250     20200   19.7400  145.3600       9.3        77       819        96
VIS    2025250     20200   19.7600  145.3400       9.6        71       915        99
VIS    2025250     20200   19.7500  145.3300       9.7        68       819        96
VIS    2025250     20200   19.7400  145.3000      10.2        62       807        91
VIS    2025250     20200   19.7500  145.2500       9.7        63       880        91
VIS    2025250     20200   19.7400  145.2100       9.8        57       894        97
VIS    2025250     20200   19.7500  145.2100       9.9        57       894        93
VIS    2025250     20200   19.7500  145.1600       9.8        62       905        93
VIS    2025250     20200   19.7400  145.1500       9.6        63       910        94
VIS    2025250     20200   19.7500  145.1100      10.3        58       922        93
VIS    2025250     20200   19.7400  145.1000      10.5        58       922        95
VIS    2025250     20200   19.7300  145.0600      10.0        62       932        98
VIS    2025250     20200   19.7400  145.0600      10.1        61       935        98
VIS    2025250     20200   19.7400  145.0100       9.8        70       976        92
VIS    2025250     20200   19.7500  144.9800       9.9        60       965        99
VIS    2025250     20200   19.7300  144.9400      10.3        57       911        96
VIS    2025250     20200   19.7500  144.9400      10.1        58       909        95
VIS    2025250     20200   19.7400  144.9000       9.6        60       924        95
VIS    2025250     20200   19.7400  144.6100      11.0        50       993        98
VIS    2025250     20200   19.7300  144.5800      10.7        49       971        98
VIS    2025250     20200   19.7300  144.5800      10.6        49       971        98
VIS    2025250     20200   19.7300  144.5400      11.0        50       920        94
VIS    2025250     20200   19.7500  144.5300      10.8        52       904        90
VIS    2025250     20200   19.7500  144.4900       9.9        56       905        93
VIS    2025250     20200   19.7400  144.4800      10.0        59       914        97
VIS    2025250     20200   19.7300  144.4400      10.0        71       913        97
VIS    2025250     20200   19.7200  143.8100      10.1        85       855        99
VIS    2025250     20200   19.7300  143.7700       9.4        96       801        99
VIS    2025250     20200   19.7200  143.7400      10.1       104       791        98
VIS    2025250     20200   19.7200  143.7300      10.0       103       791        99
VIS    2025250     20200   19.7300  143.7000       9.1        99       764        98
VIS    2025250     20200   19.7400  143.6700       9.1       102       761        99
VIS    2025250     20200   19.7400  143.6600       9.0       103       756       100
VIS    2025250     20200   19.7400  143.6400       9.2       104       755       100
VIS    2025250     20200   19.7400  143.6000       9.9       104       778        99
VIS    2025250     20200   19.7400  143.5700      10.0       110       811        98
VIS    2025250     20200   19.7300  143.5200      10.8       105       850        90
VIS    2025250     20200   19.7300  143.4700      10.7       108       789        98
VIS    2025250     20200   19.7200  143.4500      10.6       112       748        98
VIS    2025250     20200   19.7400  143.4300       9.9       108       758        99
VIS    2025250     20200   19.7400  143.4100       9.8       106       751       100
VIS    2025250     20200   19.7300  143.3800       9.9       104       749        99
VIS    2025250     20200   19.7200  143.3600      10.1       102       729        96
VIS    2025250     20200   19.7300  143.3400      10.8       100       721        97
VIS    2025250     20200   19.7400  142.9400      10.1       123       782        91
VIS    2025250     20200   19.7200  142.8900      13.7        77       902        92
VIS    2025250     20200   19.7200  142.8700      13.5        77       902        92
VIS    2025250     20200   19.7200  142.7600      10.9        91       845        95
VIS    2025250     20200   19.7400  142.7500      11.5        86       852        97
VIS    2025250     20200   19.7400  142.7400      11.3        89       845        96
VIS    2025250     20200   19.7300  142.7100      10.0        96       795        95
VIS    2025250     20200   19.7400  142.6700       8.4        86       803        91
VIS    2025250     20200   19.7200  142.6600       8.5        82       803        91
VIS    2025250     20200   19.7300  142.6300       8.4        80       833        91
VIS    2025250     20200   19.7200  142.6000      10.1        84       877        95
VIS    2025250     20200   19.7200  142.5800      13.3        75       882        94
VIS    2025250     20200   19.7200  142.5400      12.5        86       836        96
VIS    2025250     20200   19.7200  142.5400      11.9        91       828        98
VIS    2025250     20200   19.7200  142.5000      12.9        96       806        96
VIS    2025250     20200   19.7200  142.4700      13.4        90       807        94
VIS    2025250     20200   19.7300  142.4600      12.4        89       807        93
VIS    2025250     20200   19.7100  142.4400      12.2        88       807        92
VIS    2025250     20200   19.7200  142.4200      11.7        97       827        92
VIS    2025250     20200   19.7300  142.3700      12.3        89       855        98
VIS    2025250     20200   19.7300  142.3700      12.4        84       831        95
VIS    2025250     20200   19.7100  142.3300      12.3       100       804        93
VIS    2025250     20200   19.7300  142.0700      15.6        88       882        95
VIS    2025250     20200   19.7200  142.0500      14.9        88       883        96
VIS    2025250     20200   19.7300  142.0100      14.1        79       890        90
VIS    2025250     20200   19.7100  141.9900      13.3        89       883        96
VIS    2025250     20200   19.7300  141.9800      14.7        82       891        94
VIS    2025250     20200   19.7300  141.9600      14.7        83       892        95
VIS    2025250     20200   19.7300  141.9200      14.2        84       897        95
VIS    2025250     20200   19.7300  141.8900      14.5        88       890        98
VIS    2025250     20200   19.7100  141.8800      14.9        94       889        99
VIS    2025250     20200   19.7200  141.8400      15.6        84       885        94
VIS    2025250     20200   19.7100  141.8200      15.5        85       887        95
VIS    2025250     20200   19.7200  141.8000      15.9        87       892        96
VIS    2025250     20200   19.7100  141.7700      15.4        88       896        98
VIS    2025250     20200   19.7300  141.7600      14.5        88       894        98
VIS    2025250     20200   19.7300  141.7300      12.9        85       886        91
VIS    2025250     20200   19.7300  141.6800      15.1        81       886        91
VIS    2025250     20200   19.7200  141.6600      14.5        80       886        91
VIS    2025250     20200   19.7100  141.6200      15.0        80       890        90
VIS    2025250     20200   19.7300  141.5700      15.1        82       908        91
VIS    2025250     20200   19.7200  141.5200      16.2        86       939        99
VIS    2025250     20200   19.7100  141.5200      16.6        85       932        98
VIS    2025250     20200   19.7100  141.4800      16.4        77       913        91
VIS    2025250     20200   19.7100  141.0100      12.6       114       886        90
VIS    2025250     20200   19.7200  140.9500      11.6       106       874        91
VIS    2025250     20200   19.7100  140.9200      12.3       111       872        99
VIS    2025250     20200   19.7100  140.9100      12.8       116       872       100
VIS    2025250     20200   19.7100  140.8800      13.6       123       872        96
VIS    2025250     20200   19.7200  140.8600      12.5       112       876       100
VIS    2025250     20200   19.7300  140.8200      14.3        99       892        96
VIS    2025250     20200   19.7300  140.8100      14.4        97       892        95
VIS    2025250     20200   19.7200  140.6800      13.4        96       888        94
VIS    2025250     20200   19.7100  140.6500      12.0       100       886        94
VIS    2025250     20200   19.7100  140.5800      11.1       115       881        90
VIS    2025250     20200   19.7200  140.5500      11.7        98       881        94
VIS    2025250     20200   19.7300  140.5500      11.9        94       877        92
VIS    2025250     20200   19.7300  140.5200      12.3        94       885        93
VIS    2025250     20200   19.7100  140.4800      13.8        94       886        92
VIS    2025250     20200   19.7200  140.4600      15.3        93       886        91
VIS    2025250     20200   19.7100  140.4300      15.1        93       886        90
VIS    2025250     20200   19.7200  140.4200      15.2        90       886        90
VIS    2025250     20200   19.7800  149.9900       4.8        32       908        90
VIS    2025250     20200   19.7200  146.7600       8.2        56       936        90
VIS    2025250     20200   19.7300  146.7300       7.8        54       939        92
VIS    2025250     20200   19.7400  146.7100       7.8        58       947        90
VIS    2025250     20200   19.7300  146.6500       8.8        53       972        97
VIS    2025250     20200   19.7400  146.6300       9.1        51       928        97
VIS    2025250     20200   19.7300  146.6000       8.5        49       926        97
VIS    2025250     20200   19.7400  146.5600       8.0        57       924        98
VIS    2025250     20200   19.7300  146.5400       8.2        53       939        99
VIS    2025250     20200   19.7300  146.5200       8.2        49       927        97
VIS    2025250     20200   19.7400  146.4400       8.7        54       972        93
VIS    2025250     20200   19.7300  146.4100       8.6        58       952        98
VIS    2025250     20200   19.7200  146.4100       9.0        58       952        98
VIS    2025250     20200   19.7100  145.4500       9.1        77       932        94
VIS    2025250     20200   19.7100  145.4400       9.2        79       932        94
VIS    2025250     20200   19.7300  145.4000       9.3        82       881        97
VIS    2025250     20200   19.7100  145.3800       9.2        75       820        95
VIS    2025250     20200   19.7200  145.3700       9.3        74       819        94
VIS    2025250     20200   19.7300  145.3500       9.4        73       817        96
VIS    2025250     20200   19.7100  145.3200       9.8        68       802        92
VIS    2025250     20200   19.7100  145.2800      10.0        67       814        95
VIS    2025250     20200   19.7200  145.2800      10.3        65       814        93
VIS    2025250     20200   19.7100  145.2300       9.8        58       889        95
VIS    2025250     20200   19.7200  145.2000       9.5        61       907        98
VIS    2025250     20200   19.7100  145.1700       9.6        65       929        97
VIS    2025250     20200   19.7100  145.1400      10.1        61       941        94
VIS    2025250     20200   19.7100  145.1300      10.2        60       941        95
VIS    2025250     20200   19.7300  145.1000      10.5        58       932        96
VIS    2025250     20200   19.7300  145.0600       9.9        63       932        98
VIS    2025250     20200   19.7300  144.9900      10.7        56       986        99
VIS    2025250     20200   19.7100  144.9700      11.0        53       986        93
VIS    2025250     20200   19.7200  144.9600      10.8        54       918        92
VIS    2025250     20200   19.7200  144.9100      10.3        60       915        95
VIS    2025250     20200   19.7100  144.9100      10.4        60       924        94
VIS    2025250     20200   19.7200  144.6100      10.6        54       993        96
VIS    2025250     20200   19.7000  144.5800      10.6        52       971        98
VIS    2025250     20200   19.7000  144.5500      10.7        52       950        97
VIS    2025250     20200   19.7100  144.5400      11.1        53       936        98
VIS    2025250     20200   19.7100  144.5200      11.5        54       930        98
VIS    2025250     20200   19.7100  144.4800      11.2        56       929        95
VIS    2025250     20200   19.7000  143.8600      12.9        60       968        95
VIS    2025250     20200   19.7100  143.8200      10.4        80       900        96
VIS    2025250     20200   19.7000  143.8000       8.9        93       809        96
VIS    2025250     20200   19.7100  143.7600       9.3       100       791        98
VIS    2025250     20200   19.7000  143.7400       9.8       103       770        98
VIS    2025250     20200   19.7000  143.7300       9.8       102       767        98
VIS    2025250     20200   19.7100  143.6900       9.1        99       761        98
VIS    2025250     20200   19.7200  143.6900       9.1        99       762        98
VIS    2025250     20200   19.7000  143.6400       9.5       108       780        99
VIS    2025250     20200   19.7000  143.6400       9.7       108       780        99
VIS    2025250     20200   19.7100  143.6100      10.6       109       778        98
VIS    2025250     20200   19.7000  143.5700      10.4       113       852        91
VIS    2025250     20200   19.7100  143.5600      10.3       112       852        90
VIS    2025250     20200   19.7100  143.5300      10.6       109       850        91
VIS    2025250     20200   19.7000  143.5000      10.5       106       792        98
VIS    2025250     20200   19.7100  143.4900      10.4       105       791        98
VIS    2025250     20200   19.7100  143.4500      10.7       112       744        97
VIS    2025250     20200   19.7000  143.4400      10.8       110       748        96
VIS    2025250     20200   19.7100  143.4100      10.4       105       751       100
VIS    2025250     20200   19.7100  143.3800       9.9       102       749        98
VIS    2025250     20200   19.7100  143.0000      10.4       110       700        98
VIS    2025250     20200   19.6900  142.9300      10.8        92       865        93
VIS    2025250     20200   19.6900  142.9200      10.8        93       862        97
VIS    2025250     20200   19.6900  142.9000      11.4        90       871        94
VIS    2025250     20200   19.7100  142.8700      13.2        78       891        90
VIS    2025250     20200   19.7000  142.8000       9.6        93       824        92
VIS    2025250     20200   19.6900  142.7600      10.4        99       790        94
VIS    2025250     20200   19.6900  142.7400      10.7        99       777        97
VIS    2025250     20200   19.7100  142.7200      10.3        97       779        96
VIS    2025250     20200   19.7000  142.6900       9.2        93       781        94
VIS    2025250     20200   19.7000  142.6700       9.3        86       798        93
VIS    2025250     20200   19.7100  142.6600       8.7        82       803        91
VIS    2025250     20200   19.7100  142.6000      11.3        81       877        96
VIS    2025250     20200   19.7000  142.5700      14.3        71       884        91
VIS    2025250     20200   19.7100  142.5400      13.0        82       870        97
VIS    2025250     20200   19.7100  142.5000      13.4        96       806        95
VIS    2025250     20200   19.6900  142.4800      14.9        89       815        92
VIS    2025250     20200   19.6900  142.4500      13.7        83       804        90
VIS    2025250     20200   19.6900  142.4200      13.1        85       801        90
VIS    2025250     20200   19.7100  142.3800      11.9        93       815        93
VIS    2025250     20200   19.6900  142.3500      11.1       103       783        91
VIS    2025250     20200   19.6900  142.2900      14.4        85       818        90
VIS    2025250     20200   19.7100  142.0800      15.6        89       848        93
VIS    2025250     20200   19.6900  142.0300      12.6        90       873        95
VIS    2025250     20200   19.7000  142.0300      12.6        88       875        95
VIS    2025250     20200   19.7100  142.0000      13.0        88       876        96
VIS    2025250     20200   19.7100  141.9600      13.8        86       887        95
VIS    2025250     20200   19.7100  141.8900      14.1        97       889        98
VIS    2025250     20200   19.6900  141.8800      13.5       100       876        97
VIS    2025250     20200   19.6900  141.8500      15.1        82       876        93
VIS    2025250     20200   19.6900  141.8100      15.7        83       868        92
VIS    2025250     20200   19.7000  141.8000      15.0        88       880        96
VIS    2025250     20200   19.7100  141.7700      15.0        86       896        97
VIS    2025250     20200   19.7100  141.7600      14.6        85       894        97
VIS    2025250     20200   19.7000  141.7300      13.4        86       879        93
VIS    2025250     20200   19.7100  141.6900      14.6        83       881        91
VIS    2025250     20200   19.6900  141.6800      15.1        86       881        92
VIS    2025250     20200   19.6900  141.6500      14.9        82       888        91
VIS    2025250     20200   19.6900  141.6100      15.6        80       908        91
VIS    2025250     20200   19.6900  141.5800      15.6        84       932        97
VIS    2025250     20200   19.7100  141.5500      15.6        88       936        97
VIS    2025250     20200   19.7000  141.5200      16.6        88       932        97
VIS    2025250     20200   19.6900  141.5200      16.6        84       916        94
VIS    2025250     20200   19.7000  141.4900      16.5        81       916        92
VIS    2025250     20200   19.7000  140.9500      11.6       113       874        92
VIS    2025250     20200   19.7000  140.9300      11.5       112       872        97
VIS    2025250     20200   19.6900  140.9000      12.8       125       870        93
VIS    2025250     20200   19.6800  140.8300      12.6       122       867        92
VIS    2025250     20200   19.6800  140.7200      14.0       111       875        94
VIS    2025250     20200   19.6800  140.7100      13.4       110       877        94
VIS    2025250     20200   19.7000  140.6500      11.5       105       886        96
VIS    2025250     20200   19.7000  140.6300      11.9       103       886        91
VIS    2025250     20200   19.6900  140.5400      12.5       102       885        96
VIS    2025250     20200   19.7000  140.5000      12.3        95       886        94
VIS    2025250     20200   19.6800  140.5000      12.1       101       885        96
VIS    2025250     20200   19.7000  140.4600      14.4        95       886        93
VIS    2025250     20200   19.6800  140.4300      14.9        97       885        92
VIS    2025250     20200   19.6800  140.4200      15.0        97       885        91
VIS    2025250     20200   19.7500  149.0300       5.2        39       983        90
VIS    2025250     20200   19.7100  146.7800       8.5        57       956        93
VIS    2025250     20200   19.7200  146.6700       8.3        57       971        98
VIS    2025250     20200   19.7200  146.5100       8.1        44       927        95
VIS    2025250     20200   19.7200  146.5000       8.1        43       939        97
VIS    2025250     20200   19.7100  146.4800       8.4        37       941        90
VIS    2025250     20200   19.7100  146.4400       9.8        54       978        93
VIS    2025250     20200   19.7000  146.4300       9.8        55       972        93
VIS    2025250     20200   19.7000  145.4500       9.3        76       932        94
VIS    2025250     20200   19.6900  145.4300       9.3        76       906        97
VIS    2025250     20200   19.7100  145.3900       9.3        77       820        95
VIS    2025250     20200   19.6900  145.3600       9.1        74       815        93
VIS    2025250     20200   19.7100  145.3500       9.3        73       817        93
VIS    2025250     20200   19.7000  145.2900       9.5        71       805        96
VIS    2025250     20200   19.7100  145.2800       9.9        67       815        95
VIS    2025250     20200   19.7000  145.2400      10.4        58       850        92
VIS    2025250     20200   19.7000  145.2200      10.0        58       908        97
VIS    2025250     20200   19.7000  145.1900       9.5        63       916        96
VIS    2025250     20200   19.6800  145.1500       9.9        59       966        95
VIS    2025250     20200   19.6900  145.1200      10.4        57       945        95
VIS    2025250     20200   19.7000  145.1100      10.6        57       941        94
VIS    2025250     20200   19.6800  145.0700      10.5        64       921        97
VIS    2025250     20200   19.6900  144.9900      10.8        57       986        96
VIS    2025250     20200   19.7000  144.9700      10.7        55       962        94
VIS    2025250     20200   19.7000  144.9500      10.7        55       925        94
VIS    2025250     20200   19.6900  144.9300      10.3        57       915        95
VIS    2025250     20200   19.6900  144.9100      10.5        58       918        94
VIS    2025250     20200   19.6900  144.5600      10.6        52       963        98
VIS    2025250     20200   19.6900  144.5600      10.6        53       951        97
VIS    2025250     20200   19.6900  144.5300      11.3        57       939        99
VIS    2025250     20200   19.6800  143.8400      10.8        74       845        93
VIS    2025250     20200   19.6800  143.8400      10.7        76       860        95
VIS    2025250     20200   19.6900  143.8000       9.0        93       820        95
VIS    2025250     20200   19.6800  143.7800       9.0        95       801        96
VIS    2025250     20200   19.6800  143.7500      10.0       102       770        97
VIS    2025250     20200   19.6900  143.7300       9.9       102       767        98
VIS    2025250     20200   19.6700  143.7000       9.4       100       749        97
VIS    2025250     20200   19.6700  143.6900       9.2        99       749        96
VIS    2025250     20200   19.6800  143.6700       9.3       103       762        98
VIS    2025250     20200   19.6900  143.6300       9.9       107       780        99
VIS    2025250     20200   19.6900  143.6200      10.2       108       818        97
VIS    2025250     20200   19.6800  143.5800      10.5       110       851        93
VIS    2025250     20200   19.6900  143.5500      10.1       110       852        91
VIS    2025250     20200   19.6800  143.5300       9.8       103       806        97
VIS    2025250     20200   19.6900  143.5000      10.5       105       789        98
VIS    2025250     20200   19.6700  143.4900      10.4       104       754        99
VIS    2025250     20200   19.6800  143.4600      10.4       107       746        98
VIS    2025250     20200   19.6700  143.4500      10.2       105       744        99
VIS    2025250     20200   19.6800  143.4200      10.4       104       744       100
VIS    2025250     20200   19.6800  143.4000      10.3       104       742        99
VIS    2025250     20200   19.6700  143.2300      11.5       110       733        94
VIS    2025250     20200   19.6700  143.0200      10.6       101       752        98
VIS    2025250     20200   19.6700  142.9900      11.2        91       819        91
VIS    2025250     20200   19.6700  142.9200      10.9        94       833        97
VIS    2025250     20200   19.6700  142.8900      10.6        94       817        93
VIS    2025250     20200   19.6800  142.8700      11.4        87       853        94
VIS    2025250     20200   19.6800  142.8400      10.2        90       845        96
VIS    2025250     20200   19.6700  142.8300       9.9        94       808        95
VIS    2025250     20200   19.6700  142.7900      10.0        95       790        94
VIS    2025250     20200   19.6700  142.7800      10.1        96       781        95
VIS    2025250     20200   19.6700  142.7500      10.7        99       777        98
VIS    2025250     20200   19.6900  142.7400      10.7        99       777        97
VIS    2025250     20200   19.6800  142.7000       9.9        96       777        96
VIS    2025250     20200   19.6700  142.6800      10.4        92       790        95
VIS    2025250     20200   19.6800  142.6500      12.0        79       814        90
VIS    2025250     20200   19.6700  142.6100      16.4        82       854        91
VIS    2025250     20200   19.6700  142.3800      11.7        92       774        92
VIS    2025250     20200   19.6700  142.3500      12.3        97       783        92
VIS    2025250     20200   19.6700  142.3100      14.6        87       799        90
VIS    2025250     20200   19.6800  142.0300      12.7        93       872        95
VIS    2025250     20200   19.6600  142.0100      12.7        95       872        97
VIS    2025250     20200   19.6600  141.9700      12.3       111       869        90
VIS    2025250     20200   19.6700  141.9000      12.2        97       873        95
VIS    2025250     20200   19.6800  141.8800      13.7       101       875        94
VIS    2025250     20200   19.6700  141.8400      15.9        88       871        94
VIS    2025250     20200   19.6700  141.8400      15.9        87       868        94
VIS    2025250     20200   19.6800  141.8000      15.2        86       868        94
VIS    2025250     20200   19.6600  141.7800      15.7        79       876        91
VIS    2025250     20200   19.6600  141.7300      14.3        83       879        91
VIS    2025250     20200   19.6600  141.7100      15.1        87       879        92
VIS    2025250     20200   19.6800  141.6500      15.0        82       888        90
VIS    2025250     20200   19.6800  141.6300      15.3        83       900        91
VIS    2025250     20200   19.6700  141.6100      16.0        83       921        94
VIS    2025250     20200   19.6800  141.5800      15.6        83       932        97
VIS    2025250     20200   19.6700  141.5700      15.6        80       903        91
VIS    2025250     20200   19.6800  141.5400      16.2        84       901        90
VIS    2025250     20200   19.6700  141.5000      16.0        81       900        90
VIS    2025250     20200   19.6700  141.4800      15.7        82       900        92
VIS    2025250     20200   19.6600  141.4600      15.4        84       876        90
VIS    2025250     20200   19.6600  141.0700      12.2        98       863        90
VIS    2025250     20200   19.6700  141.0500      12.5       107       863        92
VIS    2025250     20200   19.6700  141.0400      12.7       110       863        92
VIS    2025250     20200   19.6600  141.0000      12.7       109       882        93
VIS    2025250     20200   19.6600  140.9800      12.7       115       872        96
VIS    2025250     20200   19.6700  140.9400      11.1       126       867        96
VIS    2025250     20200   19.6700  140.9200      11.3       125       867        94
VIS    2025250     20200   19.6700  140.9000      12.2       124       870        92
VIS    2025250     20200   19.6600  140.8500      13.1       117       874        94
VIS    2025250     20200   19.6700  140.8300      13.3       118       874        94
VIS    2025250     20200   19.6600  140.6600      11.4       123       875        98
VIS    2025250     20200   19.6800  140.6500      11.5       116       881        98
VIS    2025250     20200   19.6800  140.5500      12.9       104       885        97
VIS    2025250     20200   19.6700  140.5300      13.1       102       886        96
VIS    2025250     20200   19.6600  140.4900      12.0       120       886        97
VIS    2025250     20200   19.6800  140.4600      13.3       103       885        96
VIS    2025250     20200   19.6600  140.4500      13.2       104       885        97
VIS    2025250     20200   19.6600  140.4200      13.7        99       885        94
VIS    2025250     20200   19.6700  140.4000      14.4       101       872        93
VIS    2025250     20200   19.6600  140.3800      13.1       106       881        98
VIS    2025250     20200   19.6900  146.7700       8.7        58       944        96
VIS    2025250     20200   19.6900  146.6300       8.1        46       960        98
VIS    2025250     20200   19.6900  146.6200       8.0        45       960        99
VIS    2025250     20200   19.6700  146.4400       9.9        51       987        91
VIS    2025250     20200   19.6900  146.1600       9.3        51       980        97
VIS    2025250     20200   19.6700  146.1300       9.2        53       983        99
VIS    2025250     20200   19.6800  145.4500       9.3        74       952        90
VIS    2025250     20200   19.6800  145.4400       9.4        74       915        95
VIS    2025250     20200   19.6700  145.4000       8.7        76       827        92
VIS    2025250     20200   19.6600  145.3800       8.7        78       825        91
VIS    2025250     20200   19.6600  145.3700       9.0        78       812        92
VIS    2025250     20200   19.6700  145.3300       8.9        72       802        91
VIS    2025250     20200   19.6700  145.3200       8.9        73       802        93
VIS    2025250     20200   19.6600  145.2900       8.8        73       815        99
VIS    2025250     20200   19.6700  145.2600       9.6        61       841        94
VIS    2025250     20200   19.6800  145.2400      10.2        58       874        95
VIS    2025250     20200   19.6700  145.2200      10.1        60       912        98
VIS    2025250     20200   19.6800  145.1500      10.0        61       976        96
VIS    2025250     20200   19.6600  145.1300      10.4        61       966        96
VIS    2025250     20200   19.6700  145.1200      10.3        61       948        97
VIS    2025250     20200   19.6800  145.0800      10.8        65       927        97
VIS    2025250     20200   19.6800  145.0700      10.6        64       927        98
VIS    2025250     20200   19.6600  144.9800      10.1        58       959        99
VIS    2025250     20200   19.6800  144.9700      10.1        58       932        99
VIS    2025250     20200   19.6600  144.9400      10.0        56       921        97
VIS    2025250     20200   19.6700  144.6000      10.7        54       980        98
VIS    2025250     20200   19.6600  144.5800      11.0        53       978        99
VIS    2025250     20200   19.6700  144.5600      10.7        54       963        98
VIS    2025250     20200   19.6600  144.5400      10.9        61       950        99
VIS    2025250     20200   19.6500  144.5100      10.7        62       920        97
VIS    2025250     20200   19.6700  144.5000      11.7        60       930        99
VIS    2025250     20200   19.6700  144.4800      11.4        61       929        98
VIS    2025250     20200   19.6700  143.8400      10.5        77       835        90
VIS    2025250     20200   19.6700  143.8100       9.4        91       823        95
VIS    2025250     20200   19.6500  143.7900       9.1        94       800        99
VIS    2025250     20200   19.6500  143.7600       9.5        99       808       100
VIS    2025250     20200   19.6600  143.7400       9.7       101       801        99
VIS    2025250     20200   19.6700  143.7100       9.4       100       749        98
VIS    2025250     20200   19.6700  143.7000       9.3       100       749        97
VIS    2025250     20200   19.6700  143.6800       9.2       100       757        95
VIS    2025250     20200   19.6700  143.6500       9.3       106       801        96
VIS    2025250     20200   19.6500  143.6300      10.6       101       822        99
VIS    2025250     20200   19.6500  143.5900      10.1        99       833        93
VIS    2025250     20200   19.6500  143.5700       9.8       100       806        97
VIS    2025250     20200   19.6500  143.5400       9.7        99       805        97
VIS    2025250     20200   19.6700  143.5100      10.0       100       795        99
VIS    2025250     20200   19.6500  143.5000      10.0        98       754        98
VIS    2025250     20200   19.6700  143.4800      10.4       104       750        98
VIS    2025250     20200   19.6600  143.4600       9.9       102       750        98
VIS    2025250     20200   19.6600  143.4100      10.1       102       737        99
VIS    2025250     20200   19.6600  143.4100      10.2       103       737        99
VIS    2025250     20200   19.6600  143.2600      11.0       113       737        97
VIS    2025250     20200   19.6500  143.2200      10.9       103       733        93
VIS    2025250     20200   19.6500  143.1400      12.0       108       720        97
VIS    2025250     20200   19.6500  143.0500      10.5       100       718        97
VIS    2025250     20200   19.6400  143.0400      10.6        98       730        96
VIS    2025250     20200   19.6500  143.0100      11.0        96       771        94
VIS    2025250     20200   19.6400  142.9900      11.9        94       787        94
VIS    2025250     20200   19.6400  142.9600      11.2        90       787        95
VIS    2025250     20200   19.6400  142.8500       9.9        93       732        92
VIS    2025250     20200   19.6400  142.8400       9.8        94       732        93
VIS    2025250     20200   19.6500  142.8200       9.9        95       752        93
VIS    2025250     20200   19.6600  142.7900      10.1        96       778        95
VIS    2025250     20200   19.6600  142.7800      10.2        97       778        97
VIS    2025250     20200   19.6600  142.7500      10.5        97       777        97
VIS    2025250     20200   19.6400  142.7200      10.3        97       781        96
VIS    2025250     20200   19.6400  142.6900      10.3        95       786        96
VIS    2025250     20200   19.6500  142.6700      11.4        88       795        94
VIS    2025250     20200   19.6400  142.6000      16.0        80       876        92
VIS    2025250     20200   19.6600  142.5200      13.9        84       793        90
VIS    2025250     20200   19.6500  142.4600      13.2        89       822        90
VIS    2025250     20200   19.6400  142.4300      14.0        85       816        92
VIS    2025250     20200   19.6500  142.3700      13.9        91       783        92
VIS    2025250     20200   19.6600  142.3600      12.8        95       783        93
VIS    2025250     20200   19.6500  142.3300      14.4        90       783        91
VIS    2025250     20200   19.6600  141.9800      12.0       106       869        90
VIS    2025250     20200   19.6400  141.9100      10.7        96       873        96
VIS    2025250     20200   19.6400  141.8700      16.3        96       871        96
VIS    2025250     20200   19.6400  141.8500      16.1        96       860        96
VIS    2025250     20200   19.6400  141.7900      16.1        81       860        90
VIS    2025250     20200   19.6400  141.6900      15.6        83       886        90
VIS    2025250     20200   19.6600  141.6100      15.9        85       929        97
VIS    2025250     20200   19.6400  141.5900      15.8        82       910        94
VIS    2025250     20200   19.6400  141.4900      16.2        89       895        93
VIS    2025250     20200   19.6300  141.4700      17.0        91       881        91
VIS    2025250     20200   19.6400  141.4500      16.1        89       875        91
VIS    2025250     20200   19.6400  141.2000      14.4        83       905        90
VIS    2025250     20200   19.6400  141.0900      11.7        97       897        93
VIS    2025250     20200   19.6500  141.0700      12.4        98       874        92
VIS    2025250     20200   19.6400  141.0500      12.5       100       887        94
VIS    2025250     20200   19.6400  141.0100      13.0       108       882        97
VIS    2025250     20200   19.6300  140.9800      13.1       114       882        96
VIS    2025250     20200   19.6300  140.9400      13.2       121       874        93
VIS    2025250     20200   19.6300  140.8900      12.0       103       875        93
VIS    2025250     20200   19.6400  140.8800      12.3       107       875        98
VIS    2025250     20200   19.6500  140.8400      13.8       111       878        96
VIS    2025250     20200   19.6400  140.8300      14.1       109       879        96
VIS    2025250     20200   19.6500  140.7000      11.6       125       872        95
VIS    2025250     20200   19.6500  140.6800      10.7       122       872        97
VIS    2025250     20200   19.6400  140.6500      12.1       118       875        99
VIS    2025250     20200   19.6500  140.6200      14.6       107       881        93
VIS    2025250     20200   19.6500  140.6100      14.8       105       885        91
VIS    2025250     20200   19.6400  140.5800      12.5       122       878        90
VIS    2025250     20200   19.6400  140.5000      12.0       120       886        91
VIS    2025250     20200   19.6400  140.4800      12.3       121       886        95
VIS    2025250     20200   19.6500  140.4700      12.7       113       885        98
VIS    2025250     20200   19.6400  140.4300      13.8       100       885        94
VIS    2025250     20200   19.6400  140.4000      13.4       112       881        96
VIS    2025250     20200   19.6500  140.3800      13.0       110       881        99
VIS    2025250     20200   19.6600  146.2000       9.8        52      1000        98
VIS    2025250     20200   19.6400  145.4600       9.0        73       915        90
VIS    2025250     20200   19.6600  145.4400       9.3        73       906        95
VIS    2025250     20200   19.6600  145.4000       8.6        75       827        92
VIS    2025250     20200   19.6600  145.3700       8.9        77       810        92
VIS    2025250     20200   19.6400  145.3500       9.0        71       802        92
VIS    2025250     20200   19.6500  145.3300       8.7        70       802        94
VIS    2025250     20200   19.6500  145.3000       8.7        75       812        98
VIS    2025250     20200   19.6400  145.2800       9.1        76       835        96
VIS    2025250     20200   19.6500  145.2700       9.3        67       841        94
VIS    2025250     20200   19.6500  145.1200      11.0        63       976        95
VIS    2025250     20200   19.6400  145.1100      11.6        66       976        95
VIS    2025250     20200   19.6500  145.0100      11.1        55       980        99
VIS    2025250     20200   19.6500  144.9800      10.0        57       959        99
VIS    2025250     20200   19.6500  144.9500       9.6        57       924        99
VIS    2025250     20200   19.6400  144.5900      11.1        51       978        99
VIS    2025250     20200   19.6400  144.5600      11.9        57       963       100
VIS    2025250     20200   19.6400  144.5500      11.9        58       951       100
VIS    2025250     20200   19.6500  144.5200      10.9        61       920        98
VIS    2025250     20200   19.6500  144.5000      10.6        62       918        97
VIS    2025250     20200   19.6300  143.8100       9.4       100       759       100
VIS    2025250     20200   19.6400  143.7700       9.2        97       801        99
VIS    2025250     20200   19.6400  143.7600       9.5       100       812        99
VIS    2025250     20200   19.6400  143.7400       9.3       103       835        95
VIS    2025250     20200   19.6400  143.7000       8.9       102       801        98
VIS    2025250     20200   19.6200  143.6900       9.2       102       817        97
VIS    2025250     20200   19.6300  143.6600      10.0       107       820        96
VIS    2025250     20200   19.6200  143.6300      10.3        99       817        99
VIS    2025250     20200   19.6200  143.6000       9.8        94       793        95
VIS    2025250     20200   19.6300  143.5800       9.7        96       793        96
VIS    2025250     20200   19.6300  143.5700       9.8        99       791        98
VIS    2025250     20200   19.6300  143.5400      10.1       100       769        98
VIS    2025250     20200   19.6200  143.5100      10.5       101       751        98
VIS    2025250     20200   19.6300  143.4800       9.9        97       751        98
VIS    2025250     20200   19.6300  143.4700       9.9        97       750        98
VIS    2025250     20200   19.6400  143.4500       9.6        98       743        98
VIS    2025250     20200   19.6400  143.4100      10.1       103       735        98
VIS    2025250     20200   19.6400  143.3100      11.3       118       707        92
VIS    2025250     20200   19.6300  143.3000      11.6       120       711        91
VIS    2025250     20200   19.6300  143.2600      11.9       106       733        97
VIS    2025250     20200   19.6300  143.2500      11.6       101       733        97
VIS    2025250     20200   19.6200  143.2200      11.1        95       728        95
VIS    2025250     20200   19.6200  143.2000      11.1        99       728        97
VIS    2025250     20200   19.6200  143.1800      12.1       106       728        99
VIS    2025250     20200   19.6300  143.1400      12.2       109       724        99
VIS    2025250     20200   19.6200  143.1200      12.2       110       724        99
VIS    2025250     20200   19.6200  143.1100      11.9       107       724        99
VIS    2025250     20200   19.6400  143.0700      10.6       103       712        99
VIS    2025250     20200   19.6400  143.0400      10.6        96       734        96
VIS    2025250     20200   19.6300  143.0100      11.5        93       754        94
VIS    2025250     20200   19.6300  143.0000      11.8        96       758        95
VIS    2025250     20200   19.6200  142.8300       9.7        95       720        95
VIS    2025250     20200   19.6400  142.8100       9.9        96       752        95
VIS    2025250     20200   19.6300  142.7800      10.2        98       778        98
VIS    2025250     20200   19.6200  142.7500       9.7        96       784        96
VIS    2025250     20200   19.6200  142.7200       9.8        96       785        95
VIS    2025250     20200   19.6300  142.7200      10.0        96       785        95
VIS    2025250     20200   19.6300  142.6900      11.2        91       797        95
VIS    2025250     20200   19.6200  142.5800      13.8        89       860        95
VIS    2025250     20200   19.6300  142.5300      12.3        95       793        91
VIS    2025250     20200   19.6200  142.5100      13.2        88       812        92
VIS    2025250     20200   19.6200  142.4800      13.1        92       844        98
VIS    2025250     20200   19.6200  142.4700      13.2        92       840        97
VIS    2025250     20200   19.6300  142.4500      13.3        89       820        94
VIS    2025250     20200   19.6200  142.4200      14.4        87       807        90
VIS    2025250     20200   19.6300  141.9200      11.1        92       871        94
VIS    2025250     20200   19.6300  141.8500      15.8        97       860        96
VIS    2025250     20200   19.6200  141.7900      16.5        80       883        92
VIS    2025250     20200   19.6100  141.7700      16.3        80       885        92
VIS    2025250     20200   19.6200  141.7300      15.2        80       887        91
VIS    2025250     20200   19.6100  141.7200      15.4        82       886        91
VIS    2025250     20200   19.6100  141.6800      15.4        83       893        92
VIS    2025250     20200   19.6200  141.6500      16.0        85       921        95
VIS    2025250     20200   19.6300  141.6200      15.9        87       929        96
VIS    2025250     20200   19.6300  141.5800      15.5        78       901        90
VIS    2025250     20200   19.6200  141.5400      14.2        79       896        91
VIS    2025250     20200   19.6200  141.5200      13.5        85       895        94
VIS    2025250     20200   19.6100  141.5000      14.6        94       891        97
VIS    2025250     20200   19.6300  141.4800      17.1        91       891        93
VIS    2025250     20200   19.6100  141.3500      14.7        88       896        94
VIS    2025250     20200   19.6200  141.3200      15.5        85       895        94
VIS    2025250     20200   19.6300  141.3100      15.1        87       895        95
VIS    2025250     20200   19.6200  141.2700      13.0        92       898        95
VIS    2025250     20200   19.6100  141.1900      14.9        83       905        91
VIS    2025250     20200   19.6100  141.1800      14.5        83       905        90
VIS    2025250     20200   19.6100  141.1600      11.9        91       908        94
VIS    2025250     20200   19.6100  141.1200      14.1        88       908        94
VIS    2025250     20200   19.6200  141.1000      13.3        93       899        95
VIS    2025250     20200   19.6200  141.0800      13.3        96       899        95
VIS    2025250     20200   19.6200  141.0400      13.1       105       889        98
VIS    2025250     20200   19.6100  141.0200      13.6       113       889        97
VIS    2025250     20200   19.6300  141.0000      12.8       114       886        96
VIS    2025250     20200   19.6200  140.9900      13.0       113       886        96
VIS    2025250     20200   19.6300  140.9500      13.7       118       875        92
VIS    2025250     20200   19.6200  140.8700      12.8       104       879        97
VIS    2025250     20200   19.6200  140.8300      13.8       107       881        93
VIS    2025250     20200   19.6300  140.8200      13.6       109       887        91
VIS    2025250     20200   19.6100  140.7700      11.9       118       872        90
VIS    2025250     20200   19.6200  140.7400      12.7       126       871        92
VIS    2025250     20200   19.6100  140.6800      11.3       123       856        96
VIS    2025250     20200   19.6100  140.6700      12.3       117       855        96
VIS    2025250     20200   19.6200  140.6300      13.3       115       858        97
VIS    2025250     20200   19.6200  140.6100      12.0       116       871        97
VIS    2025250     20200   19.6300  140.5900      12.1       121       872        90
VIS    2025250     20200   19.6200  140.5600      13.3       121       878        90
VIS    2025250     20200   19.6100  140.5100      13.1       118       875        90
VIS    2025250     20200   19.6100  140.5000      13.1       121       881        95
VIS    2025250     20200   19.6200  140.4600      13.1       113       885        97
VIS    2025250     20200   19.6200  140.4600      13.3       113       884        97
VIS    2025250     20200   19.6100  140.4300      13.0       113       883        97
VIS    2025250     20200   19.6100  140.4000      13.2       109       883        95
VIS    2025250     20200   19.6100  140.3600      15.1       104       881        95
VIS    2025250     20200   19.6200  146.3800       9.9        47       982        95
VIS    2025250     20200   19.6300  146.2000       9.7        54       974        97
VIS    2025250     20200   19.6200  146.0000       9.5        52       980        98
VIS    2025250     20200   19.6200  146.0000       9.3        53       980        97
VIS    2025250     20200   19.6100  145.4400       9.3        74       847        96
VIS    2025250     20200   19.6100  145.4300       9.4        75       837        97
VIS    2025250     20200   19.6300  145.3900       9.0        71       810        91
VIS    2025250     20200   19.6300  145.3400       9.0        70       802        92
VIS    2025250     20200   19.6200  145.3200       8.8        70       803        94
VIS    2025250     20200   19.6300  145.3000       8.8        77       819        96
VIS    2025250     20200   19.6300  145.2900       9.0        77       835        96
VIS    2025250     20200   19.6200  145.2600       9.7        65       906        96
VIS    2025250     20200   19.6200  145.2400       9.9        61       923        96
VIS    2025250     20200   19.6100  144.9800      10.1        54       965        95
VIS    2025250     20200   19.6200  144.9500       9.7        53       935        97
VIS    2025250     20200   19.6200  144.5800      11.7        56       978       100
VIS    2025250     20200   19.6000  144.5700      11.9        56       960        99
VIS    2025250     20200   19.6200  144.5500      12.3        61       960       100
VIS    2025250     20200   19.6200  143.7900       8.9        99       789        98
VIS    2025250     20200   19.6200  143.7700       9.0       100       798        99
VIS    2025250     20200   19.6200  143.7500       9.1       104       836        94
VIS    2025250     20200   19.6000  143.6900       9.6        97       813        99
VIS    2025250     20200   19.6100  143.6600      10.5       104       813        98
VIS    2025250     20200   19.6000  143.6400      10.4       103       779        99
VIS    2025250     20200   19.6000  143.6100       9.9        98       771        99
VIS    2025250     20200   19.6100  143.5800       9.8        97       760        97
VIS    2025250     20200   19.6200  143.5700       9.8        98       760        97
VIS    2025250     20200   19.6000  143.5400      10.6       103       737        99
VIS    2025250     20200   19.6100  143.5200      10.7       102       746        98
VIS    2025250     20200   19.6100  143.5000      10.3       100       749        98
VIS    2025250     20200   19.6200  143.4700      10.0        98       749        98
VIS    2025250     20200   19.6100  143.4400      10.3       107       733       100
VIS    2025250     20200   19.6000  143.4300      11.3       113       726        95
VIS    2025250     20200   19.6100  143.4100      11.1       105       726        95
VIS    2025250     20200   19.6000  143.2900      12.5       110       730        97
VIS    2025250     20200   19.6000  143.2700      12.6       106       732        91
VIS    2025250     20200   19.6000  143.2500      12.6       103       726        95
VIS    2025250     20200   19.6000  143.2300      11.8       101       726        97
VIS    2025250     20200   19.6100  143.2000      11.2        99       728        97
VIS    2025250     20200   19.6100  143.1800      11.7       104       728        99
VIS    2025250     20200   19.6000  143.1400      12.1       110       732        99
VIS    2025250     20200   19.6100  143.1200      12.1       110       730        97
VIS    2025250     20200   19.5900  143.1000      11.2       104       735        98
VIS    2025250     20200   19.6000  143.0900      11.3       104       735        99
VIS    2025250     20200   19.6000  143.0600      11.5        98       731        97
VIS    2025250     20200   19.5900  143.0400      11.4        96       731        96
VIS    2025250     20200   19.6100  142.8200       9.6        95       751        95
VIS    2025250     20200   19.6100  142.8000       9.7        97       786        98
VIS    2025250     20200   19.6000  142.7700      10.1        97       794        99
VIS    2025250     20200   19.6100  142.7400       9.5        96       785        95
VIS    2025250     20200   19.6100  142.7300       9.5        95       785        94
VIS    2025250     20200   19.6000  142.7000      10.8        81       817        90
VIS    2025250     20200   19.5900  142.6300      15.6        76       862        90
VIS    2025250     20200   19.5900  142.6300      15.8        76       862        91
VIS    2025250     20200   19.6000  142.5900      16.2        84       860        90
VIS    2025250     20200   19.6000  142.5700      13.8        98       852        93
VIS    2025250     20200   19.5900  142.5300      11.9        88       829        94
VIS    2025250     20200   19.6000  142.5000      13.3        86       846        96
VIS    2025250     20200   19.6100  142.4800      13.1        91       844        98
VIS    2025250     20200   19.6100  142.4600      13.1        91       831        97
VIS    2025250     20200   19.6100  142.4300      14.1        88       809        92
VIS    2025250     20200   19.6000  141.7800      15.9        82       885        92
VIS    2025250     20200   19.6000  141.7500      16.5        81       886        92
VIS    2025250     20200   19.6000  141.7100      15.5        83       886        91
VIS    2025250     20200   19.6100  141.7000      15.3        82       890        91
VIS    2025250     20200   19.6100  141.6600      16.0        87       901        95
VIS    2025250     20200   19.5900  141.5200      12.0        86       893        93
VIS    2025250     20200   19.5900  141.5000      12.3        96       878        97
VIS    2025250     20200   19.6000  141.4800      15.3        94       878        93
VIS    2025250     20200   19.5900  141.4400      17.4        92       874        91
VIS    2025250     20200   19.6000  141.4100      13.5       108       865        94
VIS    2025250     20200   19.5900  141.3900      12.5       105       890        98
VIS    2025250     20200   19.6000  141.3500      14.5        90       893        95
VIS    2025250     20200   19.5800  141.3400      14.7        86       896        92
VIS    2025250     20200   19.6000  141.3000      15.1        94       896        92
VIS    2025250     20200   19.5900  141.2100      15.6        84       897        90
VIS    2025250     20200   19.6000  141.1800      14.8        82       905        90
VIS    2025250     20200   19.5800  141.1500      13.3        87       910        93
VIS    2025250     20200   19.5800  141.1300      13.0        88       908        94
VIS    2025250     20200   19.5900  141.1200      14.1        87       908        92
VIS    2025250     20200   19.5800  141.0900      14.2        89       899        91
VIS    2025250     20200   19.6000  141.0300      13.9       112       889       100
VIS    2025250     20200   19.6000  141.0200      13.9       113       889        99
VIS    2025250     20200   19.5900  140.9800      12.7       113       886        98
VIS    2025250     20200   19.6000  140.9800      13.1       112       886        92
VIS    2025250     20200   19.6000  140.9500      13.9       107       882        92
VIS    2025250     20200   19.5800  140.8800      12.6       111       884        97
VIS    2025250     20200   19.5900  140.8700      12.5       114       884        91
VIS    2025250     20200   19.5800  140.8300      12.0       106       881        93
VIS    2025250     20200   19.5800  140.8100      12.6       105       878        94
VIS    2025250     20200   19.5900  140.8000      12.6       104       879        94
VIS    2025250     20200   19.5900  140.7700      11.7       115       871        93
VIS    2025250     20200   19.6000  140.7400      11.5       126       866        96
VIS    2025250     20200   19.5800  140.7200      10.8       120       859        98
VIS    2025250     20200   19.5900  140.6900      11.6       122       855        96
VIS    2025250     20200   19.5900  140.6700      12.4       118       855        96
VIS    2025250     20200   19.6000  140.6400      13.5       116       856        96
VIS    2025250     20200   19.5800  140.6200      12.3       123       859        99
VIS    2025250     20200   19.5800  140.5900      11.4       118       866        95
VIS    2025250     20200   19.5800  140.5700      12.8       122       868        94
VIS    2025250     20200   19.5900  140.5600      13.0       122       868        94
VIS    2025250     20200   19.6000  140.5400      13.3       120       875        92
VIS    2025250     20200   19.6000  140.5000      13.3       120       875        94
VIS    2025250     20200   19.6000  140.4700      14.2       118       878        91
VIS    2025250     20200   19.5800  140.4700      14.3       118       877        94
VIS    2025250     20200   19.5900  140.4300      13.2       110       884        95
VIS    2025250     20200   19.5800  140.4000      14.0        99       886        92
VIS    2025250     20200   19.6000  140.3800      15.0       105       881        95
VIS    2025250     20200   19.5800  140.3600      13.4       100       880        94
VIS    2025250     20200   19.6500  149.3100       6.1        67       972        92
VIS    2025250     20200   19.6000  145.9600       8.8        55       980        98
VIS    2025250     20200   19.6000  145.4800       9.3        65       957        91
VIS    2025250     20200   19.6000  145.4600       9.1        69       917        94
VIS    2025250     20200   19.6000  145.4400       9.4        73       850        95
VIS    2025250     20200   19.6100  145.4300       9.5        74       837        96
VIS    2025250     20200   19.6000  145.4100       9.8        70       809        95
VIS    2025250     20200   19.5900  145.3700       9.8        65       805        92
VIS    2025250     20200   19.6000  145.3400       9.4        69       802        93
VIS    2025250     20200   19.5900  145.3100       9.7        66       822        92
VIS    2025250     20200   19.6000  145.3100       9.4        67       822        93
VIS    2025250     20200   19.6000  144.9800      10.1        54       965        95
VIS    2025250     20200   19.6000  144.9600       9.8        52       956        96
VIS    2025250     20200   19.5800  144.5500      11.2        56       927        98
VIS    2025250     20200   19.5800  144.2100       8.3        75       909        94
VIS    2025250     20200   19.5800  143.7900       8.4        95       745        92
VIS    2025250     20200   19.5800  143.7900       8.5        96       748        94
VIS    2025250     20200   19.5700  143.7100       8.7        92       791        91
VIS    2025250     20200   19.5800  143.6800       9.4        95       791        97
VIS    2025250     20200   19.5700  143.6500      10.2       105       771        97
VIS    2025250     20200   19.5900  143.6300      10.1       104       770        98
VIS    2025250     20200   19.5700  143.6000      10.1       101       751        98
VIS    2025250     20200   19.5800  143.5900      10.1       101       742        98
VIS    2025250     20200   19.5900  143.5500      10.7       105       736        99
VIS    2025250     20200   19.5900  143.5400      10.6       103       736        99
VIS    2025250     20200   19.5800  143.5000      10.2       100       738        99
VIS    2025250     20200   19.5800  143.4900      10.1        99       740        98
VIS    2025250     20200   19.5800  143.4600      10.6       103       726        96
VIS    2025250     20200   19.5900  143.4300      11.2       112       726        97
VIS    2025250     20200   19.5800  143.3100      11.6       109       722        99
VIS    2025250     20200   19.5900  143.2900      12.5       109       732        96
VIS    2025250     20200   19.5800  143.2700      12.3       106       732        91
VIS    2025250     20200   19.5900  143.2300      11.7       102       725        97
VIS    2025250     20200   19.5800  143.2300      11.2       100       725        97
VIS    2025250     20200   19.5700  143.1800      10.2        91       745        94
VIS    2025250     20200   19.5700  143.1800      10.4        91       745        94
VIS    2025250     20200   19.5800  143.1400      11.1       101       738        97
VIS    2025250     20200   19.5700  143.1200      10.9        96       738        95
VIS    2025250     20200   19.5700  143.0900      11.3        98       725        96
VIS    2025250     20200   19.5700  143.0600      11.2        96       709        95
VIS    2025250     20200   19.5700  143.0400      10.9        92       704        92
VIS    2025250     20200   19.5700  142.8700       9.9        97       748        96
VIS    2025250     20200   19.5800  142.8500       9.7        97       771        97
VIS    2025250     20200   19.5800  142.8400       9.5        95       772        97
VIS    2025250     20200   19.5900  142.7900      10.2        95       800        98
VIS    2025250     20200   19.5900  142.7800      10.6        96       802        99
VIS    2025250     20200   19.5900  142.7500      10.1        95       802        96
VIS    2025250     20200   19.5900  142.7400      10.0        91       802        94
VIS    2025250     20200   19.5700  142.6500      15.0        78       876        92
VIS    2025250     20200   19.5800  142.6300      15.1        78       864        92
VIS    2025250     20200   19.5700  142.6100      14.9        89       855        96
VIS    2025250     20200   19.5900  142.5800      14.5        96       852        97
VIS    2025250     20200   19.5700  142.5500      12.8        89       835        96
VIS    2025250     20200   19.5700  142.5400      12.6        88       835        96
VIS    2025250     20200   19.5900  142.5000      13.5        84       846        95
VIS    2025250     20200   19.5800  142.4900      13.6        83       850        95
VIS    2025250     20200   19.5900  142.4600      12.6        84       831        93
VIS    2025250     20200   19.5800  141.9200       9.2       108       863        92
VIS    2025250     20200   19.5700  141.9100      10.2       108       862        95
VIS    2025250     20200   19.5700  141.7800      14.2        87       885        92
VIS    2025250     20200   19.5700  141.7700      14.7        84       887        93
VIS    2025250     20200   19.5700  141.6100      12.4        83       891        93
VIS    2025250     20200   19.5700  141.5800      12.0        87       886        94
VIS    2025250     20200   19.5700  141.5300      12.4        84       893        93
VIS    2025250     20200   19.5800  141.5100      11.7        95       878        95
VIS    2025250     20200   19.5700  141.4900      12.4        95       871        96
VIS    2025250     20200   19.5700  141.4700      14.3        91       871        93
VIS    2025250     20200   19.5800  141.4400      17.2        92       874        91
VIS    2025250     20200   19.5600  141.4100      16.1        91       901        96
VIS    2025250     20200   19.5700  141.4000      16.5        90       901        95
VIS    2025250     20200   19.5800  141.3400      14.3        87       896        91
VIS    2025250     20200   19.5700  141.3100      14.2        95       888        98
VIS    2025250     20200   19.5700  141.3000      14.3        97       888        98
VIS    2025250     20200   19.5700  141.2800      13.2        99       896        98
VIS    2025250     20200   19.5800  141.2300      15.3        84       897        90
VIS    2025250     20200   19.5600  141.1900      15.2        83       908        90
VIS    2025250     20200   19.5700  141.1700      14.1        89       913        94
VIS    2025250     20200   19.5600  141.1400      12.7        94       902        95
VIS    2025250     20200   19.5700  141.1200      13.0        93       902        94
VIS    2025250     20200   19.5700  141.1100      13.2        93       902        94
VIS    2025250     20200   19.5600  141.0200      13.1       133       876        90
VIS    2025250     20200   19.5600  141.0100      12.9       133       876        91
VIS    2025250     20200   19.5600  140.9900      12.7       114       874       100
VIS    2025250     20200   19.5600  140.9600      12.7       113       874        98
VIS    2025250     20200   19.5800  140.9400      13.4       103       874        94
VIS    2025250     20200   19.5800  140.9100      12.5       104       876        91
VIS    2025250     20200   19.5800  140.8700      12.8       116       884        94
VIS    2025250     20200   19.5600  140.8500      13.3       118       878        94
VIS    2025250     20200   19.5600  140.8300      12.9       115       878        97
VIS    2025250     20200   19.5800  140.8100      12.7       106       878        94
VIS    2025250     20200   19.5700  140.7900      12.6       111       870        96
VIS    2025250     20200   19.5600  140.7500      12.3       121       868        95
VIS    2025250     20200   19.5600  140.7500      12.1       121       868        95
VIS    2025250     20200   19.5700  140.7200      10.4       121       860        95
VIS    2025250     20200   19.5600  140.6900      13.2       122       856        99
VIS    2025250     20200   19.5600  140.6500      13.4       123       853        99
VIS    2025250     20200   19.5700  140.6500      13.5       124       853        99
VIS    2025250     20200   19.5800  140.6200      12.7       124       856       100
VIS    2025250     20200   19.5800  140.6000      11.8       119       866        98
VIS    2025250     20200   19.5700  140.5600      13.7       120       871        96
VIS    2025250     20200   19.5600  140.5500      14.3       119       871        94
VIS    2025250     20200   19.5600  140.5300      14.1       120       871        97
VIS    2025250     20200   19.5600  140.5000      13.8       120       875        97
VIS    2025250     20200   19.5800  140.4700      14.1       119       875        93
VIS    2025250     20200   19.5600  140.4500      13.8       113       885        96
VIS    2025250     20200   19.5600  140.4300      14.8       107       895        94
VIS    2025250     20200   19.5700  140.3700      13.2        99       880        94
VIS    2025250     20200   19.5800  145.4800       8.8        68       947        91
VIS    2025250     20200   19.5700  145.4500       9.1        77       837        99
VIS    2025250     20200   19.5800  145.4300       9.6        74       837        97
VIS    2025250     20200   19.5600  145.4100       9.7        71       820        96
VIS    2025250     20200   19.5800  145.3800       9.9        62       809        92
VIS    2025250     20200   19.5800  145.3600       9.8        64       809        91
VIS    2025250     20200   19.5700  144.9800       9.7        53       999        91
VIS    2025250     20200   19.5800  144.9600       9.3        50       958        96
VIS    2025250     20200   19.5700  144.5600      11.2        55       960        99
VIS    2025250     20200   19.5700  144.2100       8.3        76       909        94
VIS    2025250     20200   19.5600  144.1800       9.1        79       862        95
VIS    2025250     20200   19.5500  143.7800       8.3        81       840        95
VIS    2025250     20200   19.5500  143.7500       8.7        82       834        95
VIS    2025250     20200   19.5600  143.7000       8.7        92       764        92
VIS    2025250     20200   19.5700  143.6800       9.3        95       787        96
VIS    2025250     20200   19.5700  143.6500      10.1       104       777        97
VIS    2025250     20200   19.5500  143.6200      10.4       102       757        98
VIS    2025250     20200   19.5600  143.6100      10.2       101       751        97
VIS    2025250     20200   19.5500  143.5900      10.6       101       742        98
VIS    2025250     20200   19.5500  143.5600      11.2       105       742        98
VIS    2025250     20200   19.5600  143.5300      10.8       104       738        99
VIS    2025250     20200   19.5500  143.5000      10.0        98       735        98
VIS    2025250     20200   19.5600  143.4800      10.3        99       726        97
VIS    2025250     20200   19.5500  143.3100      10.6       105       703        93
VIS    2025250     20200   19.5500  143.2800      11.0       100       730        91
VIS    2025250     20200   19.5500  143.2600      11.2        98       729        95
VIS    2025250     20200   19.5500  143.2100      10.4        91       729        91
VIS    2025250     20200   19.5600  143.2000      10.2        92       740        94
VIS    2025250     20200   19.5500  143.1500      10.7        91       742        94
VIS    2025250     20200   19.5600  143.1300      10.8        93       739        93
VIS    2025250     20200   19.5600  143.1200      10.9        95       738        94
VIS    2025250     20200   19.5600  143.0900      11.5        98       725        96
VIS    2025250     20200   19.5600  143.0500      11.0        95       709        94
VIS    2025250     20200   19.5600  143.0400      10.8        91       704        93
VIS    2025250     20200   19.5600  142.8800      10.1        98       748        97
VIS    2025250     20200   19.5600  142.8800      10.3        99       772        98
VIS    2025250     20200   19.5600  142.8500      10.1        98       772        98
VIS    2025250     20200   19.5500  142.8100      11.7        83       819        93
VIS    2025250     20200   19.5500  142.7900      12.7        80       835        92
VIS    2025250     20200   19.5600  142.7800      12.3        84       819        93
VIS    2025250     20200   19.5600  142.6400      15.2        79       871        94
VIS    2025250     20200   19.5600  142.6400      15.3        79       871        94
VIS    2025250     20200   19.5600  142.6000      14.6        92       852        97
VIS    2025250     20200   19.5600  142.5900      14.5        94       846        97
VIS    2025250     20200   19.5600  142.5500      13.2        88       837        96
VIS    2025250     20200   19.5600  142.5300      13.4        85       837        95
VIS    2025250     20200   19.5400  141.7600      13.5        82       887        93
VIS    2025250     20200   19.5400  141.7600      13.4        86       883        97
VIS    2025250     20200   19.5400  141.7400      14.3        84       883        92
VIS    2025250     20200   19.5600  141.6200      13.4        84       891        93
VIS    2025250     20200   19.5600  141.5400      13.9        77       895        90
VIS    2025250     20200   19.5500  141.5100      12.5        92       878        96
VIS    2025250     20200   19.5400  141.4900      13.2        94       875        96
VIS    2025250     20200   19.5500  141.4500      15.9        87       890        93
VIS    2025250     20200   19.5500  141.4300      17.0        90       898        94
VIS    2025250     20200   19.5400  141.4200      15.8        91       896        91
VIS    2025250     20200   19.5500  141.3800      13.0       102       896        97
VIS    2025250     20200   19.5300  141.3700      11.9       105       896        95
VIS    2025250     20200   19.5400  141.3300      13.5        89       888        95
VIS    2025250     20200   19.5500  141.3200      13.6        92       888        96
VIS    2025250     20200   19.5500  141.2900      13.0       102       882        90
VIS    2025250     20200   19.5300  141.2700      12.6       114       884        91
VIS    2025250     20200   19.5300  141.1900      13.0        95       899        91
VIS    2025250     20200   19.5300  141.1800      12.8        98       899        93
VIS    2025250     20200   19.5300  141.1400      12.3       102       892        96
VIS    2025250     20200   19.5300  141.1200      12.6       104       886        95
VIS    2025250     20200   19.5500  141.1000      12.4        99       886        94
VIS    2025250     20200   19.5400  141.0800      12.9       122       875        95
VIS    2025250     20200   19.5300  141.0300      13.7       134       878        90
VIS    2025250     20200   19.5300  141.0000      13.3       133       871        93
VIS    2025250     20200   19.5300  140.9800      13.5       132       871        92
VIS    2025250     20200   19.5300  140.9600      13.6       131       871        90
VIS    2025250     20200   19.5300  140.9200      14.1       124       876        94
VIS    2025250     20200   19.5300  140.9000      14.1       119       876        95
VIS    2025250     20200   19.5500  140.8400      13.1       119       878        96
VIS    2025250     20200   19.5400  140.8200      13.5       117       871        99
VIS    2025250     20200   19.5500  140.7900      12.8       114       870        96
VIS    2025250     20200   19.5500  140.7900      13.0       116       869        95
VIS    2025250     20200   19.5500  140.7500      12.5       122       868        93
VIS    2025250     20200   19.5500  140.7000      12.6       119       859        98
VIS    2025250     20200   19.5400  140.6800      13.6       123       858        99
VIS    2025250     20200   19.5300  140.6700      13.5       125       862        99
VIS    2025250     20200   19.5500  140.6300      13.9       125       859        98
VIS    2025250     20200   19.5300  140.6100      14.9       127       865        95
VIS    2025250     20200   19.5400  140.5800      14.8       122       868        94
VIS    2025250     20200   19.5500  140.5700      14.6       121       869        96
VIS    2025250     20200   19.5300  140.5300      14.5       112       862        93
VIS    2025250     20200   19.5300  140.5200      14.5       113       860        93
VIS    2025250     20200   19.5500  140.5000      14.0       119       874        97
VIS    2025250     20200   19.5500  140.4200      15.1       108       896        90
VIS    2025250     20200   19.5400  140.3900      14.2       110       891        91
VIS    2025250     20200   19.5800  149.3500       6.5        59       986        93
VIS    2025250     20200   19.5800  149.3100       6.3        63       974        90
VIS    2025250     20200   19.5400  145.5100       8.9        69       920        95
VIS    2025250     20200   19.5400  145.4800       9.3        72       822        94
VIS    2025250     20200   19.5400  145.4800       9.4        76       817        93
VIS    2025250     20200   19.5500  145.4600       9.2        77       822        97
VIS    2025250     20200   19.5600  145.4100       9.7        71       820        96
VIS    2025250     20200   19.5500  145.3900       9.9        61       817        93
VIS    2025250     20200   19.5500  145.3800      10.0        59       820        92
VIS    2025250     20200   19.5500  145.3400      10.6        62       829        90
VIS    2025250     20200   19.5400  145.3300      10.5        63       843        91
VIS    2025250     20200   19.5600  145.3100      10.0        66       905        94
VIS    2025250     20200   19.5600  145.2400      10.4        55       986        93
VIS    2025250     20200   19.5500  144.5700       9.8        56       919        97
VIS    2025250     20200   19.5400  144.2000       8.2        75       840        91
VIS    2025250     20200   19.5300  144.1800       8.8        72       845        92
VIS    2025250     20200   19.5400  144.1500      10.1        64       862        92
VIS    2025250     20200   19.5300  144.1500      10.0        61       862        91
VIS    2025250     20200   19.5400  144.1100      11.3        51       959        97
VIS    2025250     20200   19.5400  143.7900       8.3        86       840        96
VIS    2025250     20200   19.5400  143.7800       8.2        84       840        96
VIS    2025250     20200   19.5300  143.7400       8.7        82       764        94
VIS    2025250     20200   19.5400  143.7000       8.6        91       762        90
VIS    2025250     20200   19.5400  143.6600       9.9        99       792        98
VIS    2025250     20200   19.5300  143.6500      10.1        99       792        98
VIS    2025250     20200   19.5400  143.6100      10.5       101       751        96
VIS    2025250     20200   19.5400  143.6100      10.6       101       751        96
VIS    2025250     20200   19.5400  143.5800      11.0       100       742        98
VIS    2025250     20200   19.5200  143.5600      11.5       106       742        98
VIS    2025250     20200   19.5200  143.5200      11.2       104       738        98
VIS    2025250     20200   19.5200  143.5000      10.6        99       717        98
VIS    2025250     20200   19.5400  143.4800      10.4        98       700        98
VIS    2025250     20200   19.5300  143.2500      11.3        92       728        94
VIS    2025250     20200   19.5300  143.2400      11.2        94       728        94
VIS    2025250     20200   19.5400  143.2100      10.6        93       729        92
VIS    2025250     20200   19.5200  143.1800      11.4        98       734        96
VIS    2025250     20200   19.5200  143.1600      11.5       101       741        98
VIS    2025250     20200   19.5400  143.1300      10.9        93       740        94
VIS    2025250     20200   19.5300  143.1100      11.2        95       737        96
VIS    2025250     20200   19.5300  143.1000      11.3        96       734        96
VIS    2025250     20200   19.5200  142.9600      10.9        99       727        98
VIS    2025250     20200   19.5200  142.9400      10.7        98       763        98
VIS    2025250     20200   19.5300  142.9100      10.3        97       783        98
VIS    2025250     20200   19.5200  142.8900      10.6        94       800        95
VIS    2025250     20200   19.5400  142.8800      10.9        95       785        97
VIS    2025250     20200   19.5200  142.8300      14.9        80       845        91
VIS    2025250     20200   19.5200  142.8200      15.5        81       845        90
VIS    2025250     20200   19.5400  142.8000      13.6        80       848        92
VIS    2025250     20200   19.5300  142.6700      15.3        80       876        94
VIS    2025250     20200   19.5400  142.6400      15.9        80       867        92
VIS    2025250     20200   19.5400  142.6200      15.9        83       854        92
VIS    2025250     20200   19.5300  142.6000      14.1        97       846        95
VIS    2025250     20200   19.5400  142.5900      13.8        95       846        94
VIS    2025250     20200   19.5200  142.5600      14.5        89       844        94
VIS    2025250     20200   19.5300  141.7600      13.4        87       880        97
VIS    2025250     20200   19.5300  141.7400      14.1        85       880        95
VIS    2025250     20200   19.5300  141.5200      13.6        87       881        93
VIS    2025250     20200   19.5300  141.5100      13.5        91       878        95
VIS    2025250     20200   19.5200  141.4700      14.4        95       881        97
VIS    2025250     20200   19.5100  141.4700      14.5        94       881        97
VIS    2025250     20200   19.5100  141.4400      14.9        91       890        96
VIS    2025250     20200   19.5300  141.4000      12.4        95       895        97
VIS    2025250     20200   19.5300  141.4000      12.5        98       896        97
VIS    2025250     20200   19.5300  141.3700      11.6       105       895        93
VIS    2025250     20200   19.5100  141.2800      13.0       117       884        93
VIS    2025250     20200   19.5200  141.2700      13.2       118       884        91
VIS    2025250     20200   19.5200  141.2100      12.1       103       894        93
VIS    2025250     20200   19.5300  141.2000      12.5        97       899        91
VIS    2025250     20200   19.5300  141.1800      12.4       101       895        93
VIS    2025250     20200   19.5300  141.1400      12.5       105       889        95
VIS    2025250     20200   19.5300  141.1200      13.0       106       886        93
VIS    2025250     20200   19.5100  141.1000      13.3       114       874        91
VIS    2025250     20200   19.5300  141.0600      13.5       123       878        95
VIS    2025250     20200   19.5200  141.0000      13.4       134       871        92
VIS    2025250     20200   19.5300  140.9600      13.7       132       871        90
VIS    2025250     20200   19.5200  140.9500      13.7       131       871        90
VIS    2025250     20200   19.5200  140.9200      14.6       123       876        95
VIS    2025250     20200   19.5300  140.9100      14.3       119       876        95
VIS    2025250     20200   19.5200  140.8900      14.8       121       875        94
VIS    2025250     20200   19.5100  140.8600      14.1       121       872        98
VIS    2025250     20200   19.5100  140.8300      12.8       121       867        95
VIS    2025250     20200   19.5100  140.8000      12.4       120       867        93
VIS    2025250     20200   19.5100  140.7500      12.1       115       862        90
VIS    2025250     20200   19.5100  140.7100      12.8       121       863        92
VIS    2025250     20200   19.5100  140.6800      13.4       126       865        98
VIS    2025250     20200   19.5300  140.6700      13.5       125       862        99
VIS    2025250     20200   19.5200  140.6300      14.0       127       863        96
VIS    2025250     20200   19.5100  140.6000      13.5       130       863        94
VIS    2025250     20200   19.5100  140.5900      13.8       127       865        93
VIS    2025250     20200   19.5100  140.5700      13.8       119       862        93
VIS    2025250     20200   19.5200  140.5300      14.4       111       860        92
VIS    2025250     20200   19.5300  140.5200      14.3       112       860        93
VIS    2025250     20200   19.5200  140.4500      12.6       119       871        92
VIS    2025250     20200   19.5300  140.4200      14.7       121       890        94
VIS    2025250     20200   19.5200  140.4000      14.3       124       872        97
VIS    2025250     20200   19.5200  140.3800      13.9       119       890        98
VIS    2025250     20200   19.5600  149.3700       7.1        55       995        93
VIS    2025250     20200   19.5500  149.3400       6.8        53       975        94
VIS    2025250     20200   19.5600  149.3400       6.7        57       974        95
VIS    2025250     20200   19.5500  149.2800       6.0        62       941        92
VIS    2025250     20200   19.5600  149.0700       4.3        53       981        93
VIS    2025250     20200   19.5300  145.5200       9.1        70       942        94
VIS    2025250     20200   19.5100  145.5100       9.7        71       817        95
VIS    2025250     20200   19.5300  145.4800       9.6        75       817        92
VIS    2025250     20200   19.5100  145.4600       9.9        78       845        98
VIS    2025250     20200   19.5300  145.4300       9.4        78       827        95
VIS    2025250     20200   19.5300  145.4100       9.4        68       820        94
VIS    2025250     20200   19.5200  145.3800      10.2        58       825        91
VIS    2025250     20200   19.5200  145.3500      10.6        59       829        91
VIS    2025250     20200   19.5200  145.3400      10.5        61       845        92
VIS    2025250     20200   19.5100  145.3100       9.7        67       920        95
VIS    2025250     20200   19.5100  144.8500      11.4        56       969       100
VIS    2025250     20200   19.5000  144.4000       8.5        84       769        96
VIS    2025250     20200   19.5100  144.4000       8.7        81       769        95
VIS    2025250     20200   19.5200  144.3800       8.6        87       782        99
VIS    2025250     20200   19.5000  144.3500       9.0       103       754        98
VIS    2025250     20200   19.5000  144.2300      10.3        63       948        96
VIS    2025250     20200   19.5000  144.2200       9.7        63       937        96
VIS    2025250     20200   19.5100  144.1800       8.5        72       845        90
VIS    2025250     20200   19.5100  144.1800       8.5        72       845        90
VIS    2025250     20200   19.5200  144.1400       9.8        62       913        95
VIS    2025250     20200   19.5100  144.1100      10.7        61       933        90
VIS    2025250     20200   19.5200  144.1100      10.8        58       913        92
VIS    2025250     20200   19.5100  143.8200      10.7        92       762        96
VIS    2025250     20200   19.5200  143.8100      10.0        91       776        96
VIS    2025250     20200   19.5000  143.7800       9.3        92       776        98
VIS    2025250     20200   19.5000  143.7500       9.0        89       754        96
VIS    2025250     20200   19.5000  143.7200       9.4        93       757        92
VIS    2025250     20200   19.5100  143.7000       9.3        94       788        95
VIS    2025250     20200   19.5000  143.6700       9.9        98       796        99
VIS    2025250     20200   19.5100  143.6600      10.1        99       793        99
VIS    2025250     20200   19.5000  143.6400      10.1        99       763        99
VIS    2025250     20200   19.5000  143.6100      10.6       104       738        99
VIS    2025250     20200   19.5100  143.5700      11.6       108       739        98
VIS    2025250     20200   19.5000  143.5500      11.5       107       735        99
VIS    2025250     20200   19.5000  143.5400      11.6       105       737        99
VIS    2025250     20200   19.5000  143.5200      11.2       102       724        98
VIS    2025250     20200   19.5200  143.2800      10.5        95       725        92
VIS    2025250     20200   19.5100  143.2800      10.6        95       729        92
VIS    2025250     20200   19.5200  143.2300      11.2        96       729        96
VIS    2025250     20200   19.5100  143.2200      11.2        97       729        97
VIS    2025250     20200   19.5100  143.1900      11.6        99       730        96
VIS    2025250     20200   19.5000  143.1800      11.8        97       731        96
VIS    2025250     20200   19.4900  143.1300      11.6       101       741        98
VIS    2025250     20200   19.5100  143.1100      11.0        99       736        97
VIS    2025250     20200   19.5000  143.1000      11.0        98       728        97
VIS    2025250     20200   19.5100  142.9600      10.8       101       734        98
VIS    2025250     20200   19.5100  142.9600      11.0       100       734        98
VIS    2025250     20200   19.5000  142.9300       9.8        94       783        96
VIS    2025250     20200   19.4900  142.8500      14.3        85       818        90
VIS    2025250     20200   19.4900  142.8300      14.9        87       830        91
VIS    2025250     20200   19.5000  142.8000      15.2        89       865        95
VIS    2025250     20200   19.5100  142.7800      14.4        86       881        93
VIS    2025250     20200   19.5100  142.7400      17.6        81       881        90
VIS    2025250     20200   19.5000  142.6800      15.2        84       874        96
VIS    2025250     20200   19.5000  142.6500      15.6        85       862        95
VIS    2025250     20200   19.5000  142.6400      15.7        85       862        94
VIS    2025250     20200   19.5000  142.6100      14.2       101       851        96
VIS    2025250     20200   19.5000  141.5400      14.1        88       874        92
VIS    2025250     20200   19.4900  141.5100      13.8        95       874        97
VIS    2025250     20200   19.5100  141.4900      14.7        97       875        97
VIS    2025250     20200   19.4900  141.4700      14.1        97       876        96
VIS    2025250     20200   19.5000  141.4500      14.4        96       881        97
VIS    2025250     20200   19.4900  141.4100      14.6        94       895        97
VIS    2025250     20200   19.4900  141.4000      14.6        93       895        97
VIS    2025250     20200   19.5000  141.3800      14.5        89       896        96
VIS    2025250     20200   19.4900  141.3200      11.0       102       890        95
VIS    2025250     20200   19.4800  141.2900      12.8       108       884        95
VIS    2025250     20200   19.5000  141.2800      13.5       119       884        94
VIS    2025250     20200   19.4900  141.2600      13.3       111       878        98
VIS    2025250     20200   19.5000  141.2100      12.1       113       878        94
VIS    2025250     20200   19.5000  141.2100      12.0       113       878        94
VIS    2025250     20200   19.4900  141.1700      13.3       119       878        97
VIS    2025250     20200   19.5000  141.1400      13.8       112       881        90
VIS    2025250     20200   19.4900  141.1200      13.8       116       874        95
VIS    2025250     20200   19.5000  141.1100      13.7       116       874        94
VIS    2025250     20200   19.5000  141.0800      13.6       122       870        95
VIS    2025250     20200   19.4900  141.0600      13.9       119       870        97
VIS    2025250     20200   19.4900  140.9700      14.2       128       864        93
VIS    2025250     20200   19.5000  140.9700      14.1       129       871        92
VIS    2025250     20200   19.4900  140.9400      14.5       123       874        97
VIS    2025250     20200   19.5000  140.9000      14.9       121       875        96
VIS    2025250     20200   19.5000  140.8800      14.9       123       872        92
VIS    2025250     20200   19.5000  140.8600      13.9       122       870        98
VIS    2025250     20200   19.4900  140.8300      12.7       122       867        92
VIS    2025250     20200   19.4900  140.8200      12.7       122       867        91
VIS    2025250     20200   19.4800  140.7800      13.4       112       864        95
VIS    2025250     20200   19.4800  140.7700      13.4       110       864        95
VIS    2025250     20200   19.4800  140.7200      12.3       124       863        96
VIS    2025250     20200   19.4900  140.6900      13.0       130       866        96
VIS    2025250     20200   19.5000  140.6600      13.2       129       866        96
VIS    2025250     20200   19.4900  140.6500      13.3       130       865        95
VIS    2025250     20200   19.4900  140.6200      13.5       133       863        94
VIS    2025250     20200   19.4800  140.6000      12.4       128       869        97
VIS    2025250     20200   19.5000  140.5800      12.9       128       862        93
VIS    2025250     20200   19.4800  140.5400      14.0       117       866        97
VIS    2025250     20200   19.5000  140.5200      13.8       115       866        97
VIS    2025250     20200   19.4800  140.5000      12.8       115       868        97
VIS    2025250     20200   19.5000  140.4500      12.3       120       868        91
VIS    2025250     20200   19.5000  140.4200      13.8       128       865        96
VIS    2025250     20200   19.5000  140.4000      13.7       127       863        97
VIS    2025250     20200   19.4800  140.3800      13.0       121       858        99
VIS    2025250     20200   19.5500  149.3000       6.3        63       990        93
VIS    2025250     20200   19.5400  149.2700       6.2        61       941        97
VIS    2025250     20200   19.5400  149.2700       6.1        63       941        97
VIS    2025250     20200   19.5500  149.2400       4.6        66       918        92
VIS    2025250     20200   19.5200  146.4300       9.0        50       969        99
VIS    2025250     20200   19.5200  146.4200       9.1        49       968        99
VIS    2025250     20200   19.5000  145.5800      11.5        55       938        94
VIS    2025250     20200   19.5000  145.5500       9.9        62       959        97
VIS    2025250     20200   19.4900  145.5100       9.7        71       935        95
VIS    2025250     20200   19.5100  145.4900       9.8        74       815        96
VIS    2025250     20200   19.4900  145.4600       9.7        74       849        99
VIS    2025250     20200   19.5100  145.4600       9.9        77       849        98
VIS    2025250     20200   19.5000  145.4300       9.5        72       909        97
VIS    2025250     20200   19.5100  145.3900       9.7        62       825        92
VIS    2025250     20200   19.4900  145.3600      10.0        66       900        95
VIS    2025250     20200   19.4900  145.3400      10.0        65       908        93
VIS    2025250     20200   19.4900  145.3200       9.9        66       916        92
VIS    2025250     20200   19.4900  145.3100       9.7        67       922        91
VIS    2025250     20200   19.5000  144.4000       8.1        90       769        98
VIS    2025250     20200   19.4900  144.3900       8.8       101       760        98
VIS    2025250     20200   19.5000  144.3600       9.3       104       754        97
VIS    2025250     20200   19.5000  144.2200      10.1        62       948        95
VIS    2025250     20200   19.5000  144.2200       9.8        63       937        95
VIS    2025250     20200   19.5000  144.1100      10.1        69       897        92
VIS    2025250     20200   19.4800  144.0700       9.4        84       802        94
VIS    2025250     20200   19.4700  143.8300       9.8        97       750        98
VIS    2025250     20200   19.4800  143.8300       9.9        98       750        98
VIS    2025250     20200   19.4900  143.7900       9.4        92       772        98
VIS    2025250     20200   19.4800  143.7600       9.2        88       766        96
VIS    2025250     20200   19.4900  143.7500       9.1        89       754        96
VIS    2025250     20200   19.4800  143.7300       9.9        96       778        96
VIS    2025250     20200   19.4700  143.7000      10.5        99       778        99
VIS    2025250     20200   19.4900  143.6700      10.0        99       793        99
VIS    2025250     20200   19.4900  143.6500      10.2        99       749        99
VIS    2025250     20200   19.4700  143.6200      10.5       100       736        99
VIS    2025250     20200   19.4900  143.5900      11.0       109       735        99
VIS    2025250     20200   19.4900  143.5800      11.4       110       737        98
VIS    2025250     20200   19.4800  143.5500      11.5       107       729        99
VIS    2025250     20200   19.4900  143.5300      11.3       103       726        99
VIS    2025250     20200   19.4900  143.2700      10.6        99       731        97
VIS    2025250     20200   19.4700  143.2600      10.8       101       731        98
VIS    2025250     20200   19.4900  143.2200      11.8        99       730        97
VIS    2025250     20200   19.4700  143.2000      11.8        94       731        95
VIS    2025250     20200   19.4900  143.1700      11.9        96       741        95
VIS    2025250     20200   19.4900  143.1600      11.6        98       741        96
VIS    2025250     20200   19.4900  143.1400      11.7       100       741        97
VIS    2025250     20200   19.4700  143.0000      10.7       101       752        97
VIS    2025250     20200   19.4700  142.9500      11.8        81       790        90
VIS    2025250     20200   19.4900  142.8300      14.5        89       805        90
VIS    2025250     20200   19.4900  142.8300      14.6        89       805        90
VIS    2025250     20200   19.4700  142.8000      12.5       105       776        98
VIS    2025250     20200   19.4800  142.7600      13.3        99       847        96
VIS    2025250     20200   19.4800  142.7400      16.6        85       877        93
VIS    2025250     20200   19.4700  142.6900      16.2        88       864        92
VIS    2025250     20200   19.4800  142.6700      16.2        82       868        93
VIS    2025250     20200   19.4900  142.6600      15.9        82       862        93
VIS    2025250     20200   19.4700  142.6200      12.1        88       851        96
VIS    2025250     20200   19.4800  142.6100      13.1        98       851        98
VIS    2025250     20200   19.4800  141.5400      14.1        88       847        90
VIS    2025250     20200   19.4700  141.5200      13.3        90       847        92
VIS    2025250     20200   19.4800  141.5100      13.9        93       864        95
VIS    2025250     20200   19.4700  141.4900      13.0        94       871        94
VIS    2025250     20200   19.4800  141.4700      13.7        94       874        92
VIS    2025250     20200   19.4700  141.4200      14.4        98       886        97
VIS    2025250     20200   19.4600  141.4000      13.8        96       891        94
VIS    2025250     20200   19.4600  141.3900      13.8        97       891        94
VIS    2025250     20200   19.4700  141.3600      13.8        92       891        95
VIS    2025250     20200   19.4600  141.3300      13.3        92       891        97
VIS    2025250     20200   19.4800  141.3000      12.6       107       886        94
VIS    2025250     20200   19.4600  141.2000      13.2       115       879        99
VIS    2025250     20200   19.4600  141.2000      13.2       116       879       100
VIS    2025250     20200   19.4600  141.1700      13.6       118       856        97
VIS    2025250     20200   19.4600  141.1300      13.6       114       862        93
VIS    2025250     20200   19.4700  141.1300      13.8       115       867        93
VIS    2025250     20200   19.4600  141.0800      15.1       123       859        96
VIS    2025250     20200   19.4700  141.0700      14.4       123       860        97
VIS    2025250     20200   19.4600  140.9600      14.9       125       874        93
VIS    2025250     20200   19.4600  140.9400      14.9       122       876        97
VIS    2025250     20200   19.4600  140.9300      14.7       122       876        97
VIS    2025250     20200   19.4600  140.9000      13.6       115       875       100
VIS    2025250     20200   19.4800  140.8700      13.6       116       870        99
VIS    2025250     20200   19.4600  140.8500      12.9       112       878        91
VIS    2025250     20200   19.4600  140.8000      14.1       115       870        91
VIS    2025250     20200   19.4800  140.7700      13.5       110       866        95
VIS    2025250     20200   19.4600  140.7600      14.0       113       867        98
VIS    2025250     20200   19.4800  140.7300      12.3       122       863        96
VIS    2025250     20200   19.4600  140.7000      13.0       129       866        98
VIS    2025250     20200   19.4600  140.6900      13.2       129       866        98
VIS    2025250     20200   19.4600  140.6600      14.0       129       866        96
VIS    2025250     20200   19.4600  140.6300      13.6       129       866        97
VIS    2025250     20200   19.4800  140.6000      12.3       127       869        98
VIS    2025250     20200   19.4700  140.5700      12.5       124       874        98
VIS    2025250     20200   19.4800  140.5600      13.0       124       868        99
VIS    2025250     20200   19.4600  140.5300      12.4       116       868        98
VIS    2025250     20200   19.4700  140.5000      12.6       113       868        95
VIS    2025250     20200   19.4600  140.5000      12.5       114       868        94
VIS    2025250     20200   19.4600  140.4700      12.0       113       866        91
VIS    2025250     20200   19.4700  140.4300      13.4       127       865        96
VIS    2025250     20200   19.4700  140.4100      13.9       128       865        96
VIS    2025250     20200   19.4600  140.3900      13.2       119       858        98
VIS    2025250     20200   19.4700  140.3800      12.4       116       858        98
VIS    2025250     20200   19.5200  149.2700       6.8        68       953       100
VIS    2025250     20200   19.5000  149.2400       5.9        65       938        92
VIS    2025250     20200   19.5000  149.2300       5.6        63       938        93
VIS    2025250     20200   19.4700  146.4500       9.0        57       982        96
VIS    2025250     20200   19.4700  146.4400       9.0        56       984        95
VIS    2025250     20200   19.4700  146.0100      10.4        52       995        91
VIS    2025250     20200   19.4800  145.6000      10.9        60       960        98
VIS    2025250     20200   19.4700  145.5500      10.6        51       989        98
VIS    2025250     20200   19.4800  145.5200       9.7        70       935        95
VIS    2025250     20200   19.4800  145.4900       9.7        71       815        95
VIS    2025250     20200   19.4600  145.4700       9.4        72       837        97
VIS    2025250     20200   19.4600  145.4600       9.3        72       909        98
VIS    2025250     20200   19.4600  145.4200       9.2        68       881        99
VIS    2025250     20200   19.4600  145.4000       9.2        63       881        94
VIS    2025250     20200   19.4700  145.3700      10.1        66       907        96
VIS    2025250     20200   19.4700  145.3600      10.2        65       907        97
VIS    2025250     20200   19.4600  145.3200      10.8        61       925        98
VIS    2025250     20200   19.4600  145.3100      10.6        60       925        96
VIS    2025250     20200   19.4600  144.5800       9.3        81       924        91
VIS    2025250     20200   19.4600  144.5200       8.8        70       773        91
VIS    2025250     20200   19.4500  144.4900       9.6        66       799        90
VIS    2025250     20200   19.4600  144.4800       9.9        66       830        91
VIS    2025250     20200   19.4700  144.4000       8.6       106       741        95
VIS    2025250     20200   19.4500  144.1900       9.8        92       832        91
VIS    2025250     20200   19.4700  144.1700       9.5        89       833        91
VIS    2025250     20200   19.4600  144.1500       9.7        93       792        94
VIS    2025250     20200   19.4700  144.1400       9.8        93       853        92
VIS    2025250     20200   19.4700  144.1000       9.7        90       853        96
VIS    2025250     20200   19.4500  144.0700      10.4       100       769        98
VIS    2025250     20200   19.4600  144.0600       9.9        97       769        98
VIS    2025250     20200   19.4500  143.8500       9.7        94       743        95
VIS    2025250     20200   19.4600  143.8300       9.6        96       743        99
VIS    2025250     20200   19.4500  143.8200       9.3        95       750        99
VIS    2025250     20200   19.4500  143.7800       9.0        89       803        97
VIS    2025250     20200   19.4500  143.7500       9.8        93       821        95
VIS    2025250     20200   19.4700  143.7300      10.3        98       788        98
VIS    2025250     20200   19.4600  143.7100      10.8       101       774        99
VIS    2025250     20200   19.4700  143.6900      10.4        99       773        99
VIS    2025250     20200   19.4700  143.6700      10.2        99       749        98
VIS    2025250     20200   19.4500  143.6400      10.8       101       737        97
VIS    2025250     20200   19.4500  143.6100      10.7       100       731        98
VIS    2025250     20200   19.4500  143.5800      10.9        98       725        97
VIS    2025250     20200   19.4500  143.5700      11.0        99       722        97
VIS    2025250     20200   19.4600  143.5500      11.0        99       718        98
VIS    2025250     20200   19.4700  143.2600      10.8       101       731        98
VIS    2025250     20200   19.4500  143.2500      11.0        96       730        96
VIS    2025250     20200   19.4500  143.2100      11.4        92       732        94
VIS    2025250     20200   19.4600  143.1900      11.6        92       741        94
VIS    2025250     20200   19.4500  143.1900      11.7        91       745        93
VIS    2025250     20200   19.4600  143.1600      11.6        95       741        95
VIS    2025250     20200   19.4500  143.1200      12.0        93       716        91
VIS    2025250     20200   19.4600  143.0200      10.8        98       752        97
VIS    2025250     20200   19.4600  142.9900      11.2        97       773        97
VIS    2025250     20200   19.4600  142.8200      12.6       101       764        97
VIS    2025250     20200   19.4500  142.7900      11.4       106       771       100
VIS    2025250     20200   19.4500  142.7700      12.2        97       782        95
VIS    2025250     20200   19.4400  142.7300      15.8        88       868        95
VIS    2025250     20200   19.4400  142.7100      16.1        89       864        95
VIS    2025250     20200   19.4600  142.6900      16.2        90       860        93
VIS    2025250     20200   19.4600  142.6800      16.2        88       857        93
VIS    2025250     20200   19.4600  142.6500      15.4        81       855        93
VIS    2025250     20200   19.4600  142.6200      12.0        85       851        94
VIS    2025250     20200   19.4400  141.5400      14.5        93       868        95
VIS    2025250     20200   19.4400  141.5300      14.6        93       868        95
VIS    2025250     20200   19.4600  141.5100      11.6        91       847        90
VIS    2025250     20200   19.4400  141.4700      11.0        86       874        90
VIS    2025250     20200   19.4600  141.4200      14.2        97       886        98
VIS    2025250     20200   19.4500  141.4100      14.3        97       890        97
VIS    2025250     20200   19.4500  141.3800      14.4        96       891        93
VIS    2025250     20200   19.4400  141.3500      13.4        92       881        96
VIS    2025250     20200   19.4400  141.3400      13.3        88       879        94
VIS    2025250     20200   19.4400  141.2000      14.3       105       884        98
VIS    2025250     20200   19.4500  141.1700      13.6       118       862        98
VIS    2025250     20200   19.4500  141.1600      13.8       117       862        94
VIS    2025250     20200   19.4400  141.1100      13.9       118       859        94
VIS    2025250     20200   19.4500  141.0800      15.3       121       859        96
VIS    2025250     20200   19.4500  141.0700      15.5       121       859        96
VIS    2025250     20200   19.4400  141.0000      15.0       126       855        92
VIS    2025250     20200   19.4300  140.9600      14.2       120       876        91
VIS    2025250     20200   19.4500  140.9300      15.1       120       876        97
VIS    2025250     20200   19.4500  140.9300      15.2       119       876        97
VIS    2025250     20200   19.4400  140.9000      14.8       108       875        97
VIS    2025250     20200   19.4500  140.8700      13.9       102       878        93
VIS    2025250     20200   19.4300  140.8400      13.2        99       881        93
VIS    2025250     20200   19.4300  140.8200      13.7       107       886        91
VIS    2025250     20200   19.4300  140.7700      15.4       115       874        96
VIS    2025250     20200   19.4500  140.7600      14.4       113       868        98
VIS    2025250     20200   19.4500  140.7200      13.4       109       866        97
VIS    2025250     20200   19.4500  140.7000      12.9       121       866        99
VIS    2025250     20200   19.4300  140.6700      14.5       118       868        97
VIS    2025250     20200   19.4500  140.6600      14.0       123       868        99
VIS    2025250     20200   19.4300  140.6200      12.8       109       880        92
VIS    2025250     20200   19.4300  140.5300      11.5       109       875        95
VIS    2025250     20200   19.4400  140.5000      11.8       114       869        97
VIS    2025250     20200   19.4300  140.4800      11.2       114       866        95
VIS    2025250     20200   19.4400  140.3900      13.2       116       863        97
VIS    2025250     20200   19.4500  140.3600      12.6       113       858        97
VIS    2025250     20200   19.4600  146.6900       9.4        58       985        96
VIS    2025250     20200   19.4700  146.4500       9.0        57       960        97
VIS    2025250     20200   19.4600  146.4500       9.0        56       966        97
VIS    2025250     20200   19.4500  146.4100       9.1        53       974        96
VIS    2025250     20200   19.4600  146.3300      10.8        49       974        92
VIS    2025250     20200   19.4400  146.1400      10.6        52       970        96
VIS    2025250     20200   19.4500  145.5500      10.6        50       986        98
VIS    2025250     20200   19.4500  145.5100       9.9        65       935        96
VIS    2025250     20200   19.4500  145.4800       9.6        66       837        94
VIS    2025250     20200   19.4600  145.4600       9.3        72       909        98
VIS    2025250     20200   19.4500  145.4500       9.2        73       911        95
VIS    2025250     20200   19.4400  145.4200       9.3        72       895        97
VIS    2025250     20200   19.4400  145.3800      10.0        63       897        98
VIS    2025250     20200   19.4500  145.3700      10.4        63       907        97
VIS    2025250     20200   19.4400  145.3400      11.1        58       935        99
VIS    2025250     20200   19.4600  145.3200      11.1        59       935        99
VIS    2025250     20200   19.4500  145.2800      11.2        60       925        91
VIS    2025250     20200   19.4400  145.2800      11.1        58       931        93
VIS    2025250     20200   19.4400  144.6000      10.0        69       956        92
VIS    2025250     20200   19.4400  144.5800       9.2        82       910        91
VIS    2025250     20200   19.4500  144.5600       8.8        87       806        97
VIS    2025250     20200   19.4500  144.5300       8.5        77       771        94
VIS    2025250     20200   19.4500  144.5200       8.6        69       779        91
VIS    2025250     20200   19.4400  144.2100      10.1        91       832        93
VIS    2025250     20200   19.4400  144.1900       9.7        93       792        96
VIS    2025250     20200   19.4400  144.1600       9.2        93       760        98
VIS    2025250     20200   19.4300  144.1500       9.3        94       754        98
VIS    2025250     20200   19.4300  144.1200       9.6        99       734        96
VIS    2025250     20200   19.4400  144.0900      10.2       102       746        98
VIS    2025250     20200   19.4300  144.0700      10.4       101       754        98
VIS    2025250     20200   19.4300  144.0400       9.9        94       769        90
VIS    2025250     20200   19.4300  143.8900      10.4        96       746        95
VIS    2025250     20200   19.4400  143.8600       9.7        94       729        95
VIS    2025250     20200   19.4500  143.8400       9.6        95       731        98
VIS    2025250     20200   19.4400  143.8300       9.2        95       747        99
VIS    2025250     20200   19.4200  143.8000       8.9        91       788        97
VIS    2025250     20200   19.4200  143.7800       9.1        90       822        95
VIS    2025250     20200   19.4200  143.7600       9.8        93       820        96
VIS    2025250     20200   19.4300  143.7200      11.0       101       773        99
VIS    2025250     20200   19.4200  143.7100      11.2       102       755        99
VIS    2025250     20200   19.4400  143.6900      11.1       101       737        99
VIS    2025250     20200   19.4400  143.6600      10.7       100       732        97
VIS    2025250     20200   19.4400  143.6300      10.5        99       736        96
VIS    2025250     20200   19.4300  143.6100      10.6        98       734        96
VIS    2025250     20200   19.4400  143.5800      10.9        98       722        97
VIS    2025250     20200   19.4200  143.5500      10.9       102       700        99
VIS    2025250     20200   19.4400  143.5400      10.9        99       701        98
VIS    2025250     20200   19.4200  143.2800      11.9       104       716        93
VIS    2025250     20200   19.4400  143.2600      10.9       101       730        97
VIS    2025250     20200   19.4400  143.2400      10.9        93       730        95
VIS    2025250     20200   19.4400  143.2100      11.4        92       734        94
VIS    2025250     20200   19.4200  143.1100      12.9        93       734        93
VIS    2025250     20200   19.4300  143.1000      12.6        94       716        93
VIS    2025250     20200   19.4200  143.0800      12.5        95       762        91
VIS    2025250     20200   19.4300  143.0500      11.9        94       737        95
VIS    2025250     20200   19.4200  143.0300      12.8        93       798        95
VIS    2025250     20200   19.4200  143.0000      13.3        89       829        95
VIS    2025250     20200   19.4200  142.9100      13.5        85       824        90
VIS    2025250     20200   19.4200  142.8600      16.0        98       808        90
VIS    2025250     20200   19.4200  142.8300      15.7        96       810        90
VIS    2025250     20200   19.4200  142.7900      15.3        86       860        93
VIS    2025250     20200   19.4300  142.7800      13.0        92       806        91
VIS    2025250     20200   19.4200  142.7400      15.8        83       868        94
VIS    2025250     20200   19.4400  142.7300      15.8        87       868        95
VIS    2025250     20200   19.4400  142.7100      16.1        89       864        95
VIS    2025250     20200   19.4200  142.6900      16.6        88       851        90
VIS    2025250     20200   19.4200  141.5500      13.0        93       868        93
VIS    2025250     20200   19.4300  141.5400      14.8        94       868        95
VIS    2025250     20200   19.4300  141.4300      12.8        95       878        95
VIS    2025250     20200   19.4100  141.4200      13.3        94       875        94
VIS    2025250     20200   19.4200  141.3900      14.3        94       879        96
VIS    2025250     20200   19.4300  141.3600      13.8        93       879        95
VIS    2025250     20200   19.4300  141.3400      13.1        90       876        94
VIS    2025250     20200   19.4100  141.3300      12.5        89       874        93
VIS    2025250     20200   19.4300  141.2500      13.5       100       886        90
VIS    2025250     20200   19.4200  141.2300      16.3        92       891        92
VIS    2025250     20200   19.4300  141.1900      15.1       101       891        97
VIS    2025250     20200   19.4200  141.1800      15.2       102       891        98
VIS    2025250     20200   19.4200  141.1400      13.5       108       875        96
VIS    2025250     20200   19.4100  141.1300      13.8       104       875        95
VIS    2025250     20200   19.4200  141.1100      13.7       116       867        99
VIS    2025250     20200   19.4300  141.0800      15.1       117       859        97
VIS    2025250     20200   19.4100  141.0400      15.3       115       860        91
VIS    2025250     20200   19.4100  141.0400      15.1       116       860        91
VIS    2025250     20200   19.4300  140.9500      13.5       116       876        94
VIS    2025250     20200   19.4200  140.9300      14.4       108       871        96
VIS    2025250     20200   19.4100  140.9200      15.1       103       874        96
VIS    2025250     20200   19.4200  140.8800      15.9       101       876        90
VIS    2025250     20200   19.4200  140.8600      14.6        97       884        92
VIS    2025250     20200   19.4300  140.8400      13.5        96       884        91
VIS    2025250     20200   19.4300  140.8100      14.4       108       886        92
VIS    2025250     20200   19.4100  140.7500      15.2       101       884        92
VIS    2025250     20200   19.4100  140.7500      15.4       101       883        95
VIS    2025250     20200   19.4200  140.7100      15.3        96       883        90
VIS    2025250     20200   19.4300  140.6800      14.7       115       868        96
VIS    2025250     20200   19.4200  140.6300      13.2       110       881        94
VIS    2025250     20200   19.4200  140.6200      12.8       106       883        93
VIS    2025250     20200   19.4100  140.5900      12.7       103       883        91
VIS    2025250     20200   19.4300  140.5600      11.8       108       878        94
VIS    2025250     20200   19.4300  140.5300      11.3       111       875        97
VIS    2025250     20200   19.4300  140.5200      11.4       114       872        96
VIS    2025250     20200   19.4200  140.5000      11.8       119       869        97
VIS    2025250     20200   19.4200  140.4100      12.8       119       865        91
VIS    2025250     20200   19.4100  140.3600      13.2       125       866        98
VIS    2025250     20200   19.4600  149.3200       6.4        73       962        96
VIS    2025250     20200   19.4400  146.4700       9.8        53       971        97
VIS    2025250     20200   19.4200  146.4400       9.4        50       960        97
VIS    2025250     20200   19.4400  146.4100       9.1        53       974        96
VIS    2025250     20200   19.4300  146.3800       9.7        50       977        96
VIS    2025250     20200   19.4300  145.5200       9.9        60       949        99
VIS    2025250     20200   19.4200  145.5000       9.6        62       925        99
VIS    2025250     20200   19.4300  145.4700       9.5        68       841        93
VIS    2025250     20200   19.4300  145.4600       9.5        70       851        92
VIS    2025250     20200   19.4300  145.4200       9.6        72       911        96
VIS    2025250     20200   19.4300  145.4000       9.6        71       881        99
VIS    2025250     20200   19.4300  145.3800      10.1        62       900        98
VIS    2025250     20200   19.4100  145.3400      10.7        56       908        95
VIS    2025250     20200   19.4100  145.3400      10.8        55       943        98
VIS    2025250     20200   19.4200  145.3100      12.2        54       941        98
VIS    2025250     20200   19.4300  145.2800      11.4        57       931        95
VIS    2025250     20200   19.4200  145.2600      10.9        53       942        95
VIS    2025250     20200   19.4100  144.5600       8.6        90       836        92
VIS    2025250     20200   19.4100  144.5200       8.0        85       771        98
VIS    2025250     20200   19.4100  144.5100       8.1        85       771        97
VIS    2025250     20200   19.4100  144.4700       9.3        87       721        96
VIS    2025250     20200   19.4100  144.2000       9.9        81       800        93
VIS    2025250     20200   19.4100  144.1900       9.0        83       761        95
VIS    2025250     20200   19.4200  144.1700       8.7        88       759        97
VIS    2025250     20200   19.4000  144.1300       8.6        93       729        92
VIS    2025250     20200   19.4200  144.1100       9.8       100       720        97
VIS    2025250     20200   19.4100  144.0900       9.7        98       730        99
VIS    2025250     20200   19.4000  144.0600       9.7        96       749        97
VIS    2025250     20200   19.4100  144.0300      10.2        97       758        95
VIS    2025250     20200   19.4100  144.0000      10.4       101       725        96
VIS    2025250     20200   19.4200  144.0000      10.3       101       725        96
VIS    2025250     20200   19.4000  143.9500      10.0        97       727        97
VIS    2025250     20200   19.4100  143.9100      10.2        99       746        96
VIS    2025250     20200   19.4100  143.9000      10.3        99       746        96
VIS    2025250     20200   19.4100  143.8600       9.1        93       735        98
VIS    2025250     20200   19.4200  143.8500       9.0        92       735        98
VIS    2025250     20200   19.4200  143.8100       9.0        91       788        96
VIS    2025250     20200   19.4200  143.7800       9.2        91       822        95
VIS    2025250     20200   19.4000  143.7600      10.1        92       802        98
VIS    2025250     20200   19.4100  143.7400      10.1        95       784        99
VIS    2025250     20200   19.4200  143.7300      10.6       100       773        99
VIS    2025250     20200   19.4200  143.6900      11.4       102       737        98
VIS    2025250     20200   19.4000  143.6600      11.0        99       732        96
VIS    2025250     20200   19.4000  143.6400      10.5        97       732        94
VIS    2025250     20200   19.4100  143.6200      10.6        96       731        94
VIS    2025250     20200   19.4100  143.5900      11.3        98       711        96
VIS    2025250     20200   19.4000  143.5700      11.6       107       701        99
VIS    2025250     20200   19.4000  143.5500      11.6       107       700        99
VIS    2025250     20200   19.4100  143.2700      11.7       103       716        95
VIS    2025250     20200   19.4200  143.2300      11.3        92       734        94
VIS    2025250     20200   19.4100  143.2000      12.0        95       752        94
VIS    2025250     20200   19.4000  143.1100      12.5        93       769        92
VIS    2025250     20200   19.4200  143.0800      12.4        94       769        91
VIS    2025250     20200   19.4100  143.0500      13.1        91       793        93
VIS    2025250     20200   19.4100  143.0300      13.5        90       814        93
VIS    2025250     20200   19.3900  143.0000      14.8        81       848        91
VIS    2025250     20200   19.4000  142.9900      14.5        82       845        91
VIS    2025250     20200   19.4100  142.9100      13.4        84       830        92
VIS    2025250     20200   19.4000  142.8900      14.5        88       835        93
VIS    2025250     20200   19.4000  142.8800      15.0        88       829        92
VIS    2025250     20200   19.3900  142.8200      15.4        83       841        90
VIS    2025250     20200   19.3900  142.7800      16.9        89       878        92
VIS    2025250     20200   19.4000  142.7800      16.7        86       878        91
VIS    2025250     20200   19.4100  142.7600      15.9        84       874        95
VIS    2025250     20200   19.3900  142.7100      16.3        81       847        90
VIS    2025250     20200   19.3900  141.5600      12.2        94       871        96
VIS    2025250     20200   19.4100  141.5300      11.9        95       871        91
VIS    2025250     20200   19.4100  141.5100      10.1        90       872        92
VIS    2025250     20200   19.4100  141.4200      13.3        94       872        94
VIS    2025250     20200   19.3900  141.3800      13.7        97       869        97
VIS    2025250     20200   19.4000  141.3600      14.9        97       872        95
VIS    2025250     20200   19.3900  141.3400      14.4       101       872        96
VIS    2025250     20200   19.3900  141.3200      14.1        97       874        94
VIS    2025250     20200   19.3900  141.2900      13.7        90       886        96
VIS    2025250     20200   19.4100  141.2600      15.3        92       888        96
VIS    2025250     20200   19.4000  141.2300      16.1        93       891        93
VIS    2025250     20200   19.4000  141.2200      16.3        94       891        93
VIS    2025250     20200   19.3900  141.1900      16.7        94       889        92
VIS    2025250     20200   19.4000  141.1700      15.7        97       889        94
VIS    2025250     20200   19.4000  141.1500      14.8        95       886        94
VIS    2025250     20200   19.4000  141.1300      14.1       102       881        95
VIS    2025250     20200   19.3900  141.1000      14.4       113       867        93
VIS    2025250     20200   19.4000  141.0800      14.5       113       867        95
VIS    2025250     20200   19.3800  141.0400      14.8       104       874        95
VIS    2025250     20200   19.3900  141.0300      14.5       111       866        96
VIS    2025250     20200   19.3900  140.9900      13.3       117       863        97
VIS    2025250     20200   19.3900  140.9200      14.5        95       874        93
VIS    2025250     20200   19.3900  140.9100      14.8        97       874        93
VIS    2025250     20200   19.3800  140.8800      15.8        95       886        93
VIS    2025250     20200   19.3900  140.8600      14.4        96       894        96
VIS    2025250     20200   19.3900  140.8300      14.2        95       894        95
VIS    2025250     20200   19.4000  140.8000      14.4       106       891        92
VIS    2025250     20200   19.4000  140.7600      15.0       102       886        95
VIS    2025250     20200   19.3900  140.6500      14.8       104       881        95
VIS    2025250     20200   19.4000  140.6400      13.3       106       881        96
VIS    2025250     20200   19.4000  140.6200      12.8       105       883        95
VIS    2025250     20200   19.3900  140.5800      11.6       103       880        93
VIS    2025250     20200   19.4000  140.5700      11.4       101       878        95
VIS    2025250     20200   19.4000  140.5300      11.8       121       869        98
VIS    2025250     20200   19.3900  140.5200      12.3       127       866        95
VIS    2025250     20200   19.4000  140.4900      11.6       122       865        99
VIS    2025250     20200   19.3900  140.4700      11.2       118       865        95
VIS    2025250     20200   19.3900  140.4400      12.0       117       868        93
VIS    2025250     20200   19.3900  140.4200      14.5       121       865        96
VIS    2025250     20200   19.3800  140.3900      13.7       116       866        99
VIS    2025250     20200   19.4000  140.3700      13.4       125       866        97
VIS    2025250     20200   19.4500  149.3200       6.4        71       992        93
VIS    2025250     20200   19.4100  146.4900       9.9        52       971        97
VIS    2025250     20200   19.3900  145.4900       9.7        66       925        99
VIS    2025250     20200   19.4100  145.4800       9.4        64       851        95
VIS    2025250     20200   19.4100  145.4600       9.7        69       851        96
VIS    2025250     20200   19.4000  145.4300      10.2        77       909        96
VIS    2025250     20200   19.3900  145.3900       9.7        60       907        99
VIS    2025250     20200   19.3900  145.3800       9.7        56       906        97
VIS    2025250     20200   19.3900  145.3400      10.6        53       920        94
VIS    2025250     20200   19.3900  145.3300      10.6        52       943        96
VIS    2025250     20200   19.4100  145.3000      12.1        54       938        97
VIS    2025250     20200   19.3900  145.2700      11.7        48       933        95
VIS    2025250     20200   19.4000  145.2600      11.1        48       936        96
VIS    2025250     20200   19.3800  144.6300      10.3        58       974        93
VIS    2025250     20200   19.3900  144.6100       9.3        66       956        90
VIS    2025250     20200   19.3800  144.5600       8.4        91       799        94
VIS    2025250     20200   19.3900  144.5400       8.1        91       771        97
VIS    2025250     20200   19.4000  144.5300       8.0        88       771        99
VIS    2025250     20200   19.4000  144.4800       9.3        91       721        98
VIS    2025250     20200   19.3800  144.2800       8.8        93       772        92
VIS    2025250     20200   19.4000  144.1900       9.0        82       778        95
VIS    2025250     20200   19.3800  144.1600       8.2        84       753        92
VIS    2025250     20200   19.3900  144.1400       8.5        92       712        90
VIS    2025250     20200   19.4000  144.1300       8.6        93       720        91
VIS    2025250     20200   19.3800  144.1000       9.1        95       703        94
VIS    2025250     20200   19.3900  144.0700       9.4        97       737        97
VIS    2025250     20200   19.3800  144.0400       9.7        95       730        93
VIS    2025250     20200   19.3800  144.0300      10.0        97       730        95
VIS    2025250     20200   19.3800  144.0100      10.0        97       721        97
VIS    2025250     20200   19.3900  143.9400       9.8        92       729        96
VIS    2025250     20200   19.3900  143.9400       9.8        94       727        97
VIS    2025250     20200   19.3800  143.9100       9.3        89       729        95
VIS    2025250     20200   19.4000  143.8900       9.6        98       746        99
VIS    2025250     20200   19.3800  143.8700       8.8        89       764        98
VIS    2025250     20200   19.4000  143.8300       8.9        90       757        97
VIS    2025250     20200   19.3900  143.8000       9.8        93       803        96
VIS    2025250     20200   19.3700  143.7800      10.6        95       802        99
VIS    2025250     20200   19.3900  143.7600      10.4        93       802        99
VIS    2025250     20200   19.3700  143.7200      10.5        91       731        95
VIS    2025250     20200   19.3900  143.7000      11.2        98       731        97
VIS    2025250     20200   19.3800  143.6800      11.2        98       724        97
VIS    2025250     20200   19.3700  143.6600      11.6       101       725        95
VIS    2025250     20200   19.3800  143.6300      11.2        97       723        93
VIS    2025250     20200   19.3800  143.6000      11.2        95       718        94
VIS    2025250     20200   19.3800  143.5900      11.4        96       713        94
VIS    2025250     20200   19.3900  143.5600      11.8       106       700        99
VIS    2025250     20200   19.3700  143.2400      11.8        97       754        95
VIS    2025250     20200   19.3800  143.2200      12.0        96       752        94
VIS    2025250     20200   19.3900  143.2100      12.1        97       752        96
VIS    2025250     20200   19.3900  143.0600      13.6        87       808        91
VIS    2025250     20200   19.3700  143.0200      16.0        77       887        95
VIS    2025250     20200   19.3700  143.0100      15.9        77       887        95
VIS    2025250     20200   19.3900  142.9100      14.6        85       835        92
VIS    2025250     20200   19.3900  142.8800      14.9        86       845        92
VIS    2025250     20200   19.3700  142.8600      15.1        77       875        95
VIS    2025250     20200   19.3700  142.8200      15.3        78       889        97
VIS    2025250     20200   19.3700  142.8200      15.1        79       889        97
VIS    2025250     20200   19.3900  142.7900      16.9        90       889        94
VIS    2025250     20200   19.3700  142.7600      16.0        88       865        90
VIS    2025250     20200   19.3800  142.7300      15.4        84       852        93
VIS    2025250     20200   19.3600  141.5800      13.4        96       837        94
VIS    2025250     20200   19.3700  141.5700      12.4        97       862        97
VIS    2025250     20200   19.3600  141.4400      11.5       102       869        91
VIS    2025250     20200   19.3800  141.4200      11.3        97       871        90
VIS    2025250     20200   19.3600  141.4100      10.6        98       868        93
VIS    2025250     20200   19.3600  141.3700      15.2       106       869        93
VIS    2025250     20200   19.3700  141.3600      16.2       106       871        90
VIS    2025250     20200   19.3800  141.3200      14.3        97       875        95
VIS    2025250     20200   19.3800  141.3100      14.5        97       876        95
VIS    2025250     20200   19.3800  141.2900      13.8        92       886        96
VIS    2025250     20200   19.3600  141.2600      14.0        96       878        97
VIS    2025250     20200   19.3800  141.2300      15.5        94       889        94
VIS    2025250     20200   19.3700  141.2000      16.0        95       889        93
VIS    2025250     20200   19.3600  141.1800      15.9        95       886        93
VIS    2025250     20200   19.3600  141.1600      15.5        93       886        92
VIS    2025250     20200   19.3800  141.1300      15.0        93       886        92
VIS    2025250     20200   19.3800  141.1000      14.6       107       870        95
VIS    2025250     20200   19.3800  141.0900      14.6       110       868        91
VIS    2025250     20200   19.3700  141.0700      15.6        96       887        93
VIS    2025250     20200   19.3800  141.0400      14.8        99       884        93
VIS    2025250     20200   19.3800  140.9200      14.6        93       874        92
VIS    2025250     20200   19.3700  140.8900      15.5        90       886        92
VIS    2025250     20200   19.3600  140.8600      13.8        99       894        97
VIS    2025250     20200   19.3700  140.8300      14.3        94       895        95
VIS    2025250     20200   19.3700  140.8300      14.3        93       895        95
VIS    2025250     20200   19.3600  140.8000      14.1       102       894        98
VIS    2025250     20200   19.3700  140.7600      14.1       105       889        94
VIS    2025250     20200   19.3800  140.7600      14.3       105       889        94
VIS    2025250     20200   19.3700  140.7200      15.0       103       885        93
VIS    2025250     20200   19.3600  140.6900      13.6        97       888        94
VIS    2025250     20200   19.3600  140.6600      13.4        98       890        94
VIS    2025250     20200   19.3700  140.6300      14.6        97       881        91
VIS    2025250     20200   19.3700  140.5900      13.0       105       878        95
VIS    2025250     20200   19.3700  140.5800      12.3       106       877        93
VIS    2025250     20200   19.3600  140.5500      11.9       114       868        97
VIS    2025250     20200   19.3600  140.5300      12.2       122       866        95
VIS    2025250     20200   19.3700  140.5000      12.5       127       865        96
VIS    2025250     20200   19.3600  140.4800      12.0       120       866        95
VIS    2025250     20200   19.3700  140.4600      11.7       112       871        93
VIS    2025250     20200   19.3700  140.4300      13.3       110       871        92
VIS    2025250     20200   19.3700  140.4000      13.5       113       866        98
VIS    2025250     20200   19.3800  140.3900      13.6       115       866        99
VIS    2025250     20200   19.4000  148.6100       6.0        66       988        92
VIS    2025250     20200   19.3800  146.1100       9.5        47       975        98
VIS    2025250     20200   19.3800  145.4900       9.6        68       925        98
VIS    2025250     20200   19.3800  145.4900       9.6        66       925        99
VIS    2025250     20200   19.3800  145.4200      10.1        75       909        97
VIS    2025250     20200   19.3800  145.4000       9.5        68       909        99
VIS    2025250     20200   19.3800  145.3800       9.8        58       907        99
VIS    2025250     20200   19.3800  145.3400      10.7        53       920        94
VIS    2025250     20200   19.3800  145.3300      10.7        52       943        96
VIS    2025250     20200   19.3800  145.3000      11.6        50       943        97
VIS    2025250     20200   19.3800  145.2800      11.7        49       936        96
VIS    2025250     20200   19.3700  145.2600      11.5        46       927        95
VIS    2025250     20200   19.3700  145.2400      11.0        45       950        97
VIS    2025250     20200   19.3800  145.2100      10.7        45       979        97
VIS    2025250     20200   19.3700  144.6300      11.2        54       974        94
VIS    2025250     20200   19.3800  144.6100       9.0        70       950        90
VIS    2025250     20200   19.3600  144.5900       8.0        84       827        94
VIS    2025250     20200   19.3700  144.5600       8.2        90       795        98
VIS    2025250     20200   19.3600  144.5500       8.0        91       757        99
VIS    2025250     20200   19.3600  144.3000       7.6        95       755        91
VIS    2025250     20200   19.3700  144.2000       8.7        82       756        91
VIS    2025250     20200   19.3500  144.1700       8.6        90       722        90
VIS    2025250     20200   19.3700  144.1000       9.1        94       703        94
VIS    2025250     20200   19.3500  144.0700       9.4        96       721        95
VIS    2025250     20200   19.3600  144.0600       9.4        96       724        95
VIS    2025250     20200   19.3500  144.0200       9.9        95       721        97
VIS    2025250     20200   19.3600  144.0100       9.9        95       721        97
VIS    2025250     20200   19.3500  143.9900       9.6        94       747        96
VIS    2025250     20200   19.3500  143.9600       9.7        90       736        94
VIS    2025250     20200   19.3700  143.9400       9.7        89       729        95
VIS    2025250     20200   19.3500  143.9100      10.0        88       744        96
VIS    2025250     20200   19.3600  143.8900       9.6        88       761        97
VIS    2025250     20200   19.3700  143.8600       8.9        88       769        97
VIS    2025250     20200   19.3500  143.8200       9.0        84       785        95
VIS    2025250     20200   19.3600  143.8200       9.4        89       786        97
VIS    2025250     20200   19.3500  143.7800      10.5        95       773        99
VIS    2025250     20200   19.3700  143.7600      10.8        93       756        97
VIS    2025250     20200   19.3500  143.7400      10.7        90       731        94
VIS    2025250     20200   19.3700  143.7200      10.5        91       730        95
VIS    2025250     20200   19.3500  143.6800      11.3        99       723        96
VIS    2025250     20200   19.3600  143.6500      11.7       105       725        98
VIS    2025250     20200   19.3500  143.6300      11.8       102       721        98
VIS    2025250     20200   19.3600  143.6200      11.4        99       721        96
VIS    2025250     20200   19.3700  143.6000      11.4        95       718        94
VIS    2025250     20200   19.3700  143.5700      12.0       102       706        98
VIS    2025250     20200   19.3500  143.2400      12.4        95       758        94
VIS    2025250     20200   19.3600  143.2300      12.2        95       756        94
VIS    2025250     20200   19.3600  143.2100      12.5        94       755        94
VIS    2025250     20200   19.3500  143.1800      13.9        90       762        90
VIS    2025250     20200   19.3600  143.1600      13.8        91       752        90
VIS    2025250     20200   19.3700  143.0500      15.5        77       873        90
VIS    2025250     20200   19.3700  143.0400      15.5        77       887        93
VIS    2025250     20200   19.3600  143.0000      15.7        77       887        95
VIS    2025250     20200   19.3600  142.9900      15.5        78       875        94
VIS    2025250     20200   19.3400  142.9200      16.2        71       885        91
VIS    2025250     20200   19.3400  142.8800      16.2        71       871        90
VIS    2025250     20200   19.3600  142.8300      15.4        78       889        96
VIS    2025250     20200   19.3600  142.8200      15.4        79       889        97
VIS    2025250     20200   19.3500  142.7900      15.4        89       865        93
VIS    2025250     20200   19.3600  142.7300      15.6        86       855        93
VIS    2025250     20200   19.3600  141.5900      13.5        95       837        93
VIS    2025250     20200   19.3500  141.5700      12.8       101       862        92
VIS    2025250     20200   19.3400  141.5400      13.4       114       866        95
VIS    2025250     20200   19.3400  141.5200      14.8       115       864        93
VIS    2025250     20200   19.3500  141.4900      12.1       105       861        95
VIS    2025250     20200   19.3500  141.4200      11.6       101       868        94
VIS    2025250     20200   19.3500  141.4100      11.6       100       868        96
VIS    2025250     20200   19.3500  141.3800      13.7       103       868        97
VIS    2025250     20200   19.3400  141.3500      15.9       102       875        95
VIS    2025250     20200   19.3400  141.3200      15.0       101       875        98
VIS    2025250     20200   19.3400  141.3100      14.5       102       875        99
VIS    2025250     20200   19.3500  141.2900      13.3       100       875        99
VIS    2025250     20200   19.3500  141.2600      14.0       101       871        99
VIS    2025250     20200   19.3600  141.2300      15.4        94       881        93
VIS    2025250     20200   19.3400  141.2100      13.7        95       870        93
VIS    2025250     20200   19.3600  141.2000      15.6        95       887        94
VIS    2025250     20200   19.3600  141.1600      15.3        93       886        92
VIS    2025250     20200   19.3500  141.0900      15.2        92       891        90
VIS    2025250     20200   19.3400  141.0400      14.5        88       895        91
VIS    2025250     20200   19.3400  141.0300      13.7        88       889        91
VIS    2025250     20200   19.3300  140.9900      12.6       102       864        97
VIS    2025250     20200   19.3300  140.9800      13.5       102       849        95
VIS    2025250     20200   19.3300  140.8900      14.5        99       874        92
VIS    2025250     20200   19.3500  140.8700      13.5       103       889        94
VIS    2025250     20200   19.3500  140.8400      14.1       100       894        97
VIS    2025250     20200   19.3400  140.8300      14.4        99       891        96
VIS    2025250     20200   19.3500  140.8000      14.4       101       894        98
VIS    2025250     20200   19.3400  140.7800      14.8       104       894        96
VIS    2025250     20200   19.3500  140.7500      14.4       103       891        92
VIS    2025250     20200   19.3500  140.7100      15.2        98       885        92
VIS    2025250     20200   19.3500  140.6700      13.1        98       890        94
VIS    2025250     20200   19.3500  140.6500      14.0       100       886        95
VIS    2025250     20200   19.3500  140.6300      14.7        98       881        92
VIS    2025250     20200   19.3500  140.6000      13.8       103       877        95
VIS    2025250     20200   19.3400  140.5900      13.4       103       877        96
VIS    2025250     20200   19.3400  140.5600      12.3       111       869        98
VIS    2025250     20200   19.3500  140.5200      12.4       125       866        96
VIS    2025250     20200   19.3400  140.5100      12.0       121       866        96
VIS    2025250     20200   19.3300  140.4800      13.0       123       878        93
VIS    2025250     20200   19.3400  140.4700      13.2       120       880        92
VIS    2025250     20200   19.3400  140.4400      13.0       116       877        98
VIS    2025250     20200   19.3500  140.4200      12.6       112       868        98
VIS    2025250     20200   19.3300  140.3800      11.3       120       862        96
VIS    2025250     20200   19.3500  140.3600      11.8       122       860        97
VIS    2025250     20200   19.3800  148.6600       6.1        65       977        91
VIS    2025250     20200   19.3900  148.6500       6.5        65       978        91
VIS    2025250     20200   19.3800  148.6100       5.9        61       976        90
VIS    2025250     20200   19.3500  146.4600       9.8        52       986        93
VIS    2025250     20200   19.3600  146.3600      10.1        51       968        95
VIS    2025250     20200   19.3500  146.3300       9.8        49       968        97
VIS    2025250     20200   19.3600  145.4800       9.5        67       948        96
VIS    2025250     20200   19.3400  145.4700       9.1        68       940        94
VIS    2025250     20200   19.3500  145.3800      10.6        57       947        99
VIS    2025250     20200   19.3400  145.3500      10.5        53       947        93
VIS    2025250     20200   19.3400  145.3400      10.4        51       927        95
VIS    2025250     20200   19.3400  145.3100      10.8        50       930        97
VIS    2025250     20200   19.3400  145.3000      11.4        49       936        97
VIS    2025250     20200   19.3600  145.2600      11.7        46       922        94
VIS    2025250     20200   19.3400  145.2500      11.4        46       915        93
VIS    2025250     20200   19.3400  145.2300      10.8        48       929        96
VIS    2025250     20200   19.3500  145.1900      10.8        60       981        92
VIS    2025250     20200   19.3400  144.6000       7.6        87       827        94
VIS    2025250     20200   19.3400  144.5800       7.9        89       799        97
VIS    2025250     20200   19.3300  144.5700       8.1        90       755        98
VIS    2025250     20200   19.3400  144.5400       8.2        92       710        96
VIS    2025250     20200   19.3400  144.2000       8.7        88       747        95
VIS    2025250     20200   19.3400  144.2000       8.7        89       747        95
VIS    2025250     20200   19.3400  144.1700       8.7        91       722        91
VIS    2025250     20200   19.3300  144.1100       9.4        96       712        96
VIS    2025250     20200   19.3300  144.0800       9.3        94       714        96
VIS    2025250     20200   19.3400  144.0800       9.3        94       714        96
VIS    2025250     20200   19.3300  144.0300       9.8        95       714        97
VIS    2025250     20200   19.3400  144.0300       9.9        95       721        97
VIS    2025250     20200   19.3500  144.0000       9.6        94       748        97
VIS    2025250     20200   19.3500  143.9600       9.6        91       736        95
VIS    2025250     20200   19.3500  143.9600       9.7        91       736        94
VIS    2025250     20200   19.3300  143.9200      10.3        92       736        96
VIS    2025250     20200   19.3500  143.9100      10.0        89       754        97
VIS    2025250     20200   19.3400  143.8800       9.6        86       772        96
VIS    2025250     20200   19.3500  143.8100       9.3        87       786        96
VIS    2025250     20200   19.3300  143.7900       9.8        91       773        98
VIS    2025250     20200   19.3400  143.7800      10.1        93       770        98
VIS    2025250     20200   19.3400  143.7600      10.4        90       744        97
VIS    2025250     20200   19.3300  143.7300      10.6        88       724        93
VIS    2025250     20200   19.3400  143.7000      11.0        94       723        95
VIS    2025250     20200   19.3200  143.6700      11.3       109       725        98
VIS    2025250     20200   19.3400  143.6500      11.8       108       727        99
VIS    2025250     20200   19.3400  143.6400      11.9       107       725        99
VIS    2025250     20200   19.3400  143.6100      11.9       101       718        97
VIS    2025250     20200   19.3300  143.5900      11.6        98       703        97
VIS    2025250     20200   19.3400  143.2400      12.7        96       759        93
VIS    2025250     20200   19.3300  143.2000      13.4        90       759        91
VIS    2025250     20200   19.3400  143.1800      14.0        89       768        90
VIS    2025250     20200   19.3400  143.1700      14.0        90       768        90
VIS    2025250     20200   19.3300  143.0400      15.9        65       891        91
VIS    2025250     20200   19.3300  143.0200      14.9        66       891        92
VIS    2025250     20200   19.3400  142.9900      15.1        69       883        90
VIS    2025250     20200   19.3400  142.9800      15.0        71       871        91
VIS    2025250     20200   19.3300  142.9500      15.5        69       875        91
VIS    2025250     20200   19.3200  142.9200      15.9        66       880        90
VIS    2025250     20200   19.3400  142.8700      15.6        72       871        90
VIS    2025250     20200   19.3200  141.5800      12.9       113       850        92
VIS    2025250     20200   19.3300  141.5500      12.7       114       866        98
VIS    2025250     20200   19.3300  141.5300      13.6       115       866        96
VIS    2025250     20200   19.3300  141.5100      15.0       115       864        97
VIS    2025250     20200   19.3200  141.5000      14.5       109       859        91
VIS    2025250     20200   19.3200  141.4600      11.9       100       855        95
VIS    2025250     20200   19.3200  141.4400      12.0       103       855        97
VIS    2025250     20200   19.3300  141.4200      12.3       101       866        97
VIS    2025250     20200   19.3300  141.4000      13.0       100       868        96
VIS    2025250     20200   19.3200  141.3700      15.0        98       866        95
VIS    2025250     20200   19.3300  141.3500      15.6        99       869        94
VIS    2025250     20200   19.3300  141.3200      14.6       103       875        99
VIS    2025250     20200   19.3200  141.3000      13.5       108       865        99
VIS    2025250     20200   19.3300  141.2600      13.6       104       865        99
VIS    2025250     20200   19.3300  141.2400      14.2       101       870        91
VIS    2025250     20200   19.3300  141.2200      13.5        96       870        93
VIS    2025250     20200   19.3200  141.1700      13.5        98       874        93
VIS    2025250     20200   19.3200  141.1600      13.9        95       876        93
VIS    2025250     20200   19.3100  141.1400      14.6        97       876        92
VIS    2025250     20200   19.3100  141.0700      15.1        92       876        90
VIS    2025250     20200   19.3100  141.0600      15.5        91       882        91
VIS    2025250     20200   19.3200  141.0300      14.3        90       887        90
VIS    2025250     20200   19.3100  141.0200      14.1        92       886        91
VIS    2025250     20200   19.3300  140.9700      13.6       104       849        96
VIS    2025250     20200   19.3300  140.9700      13.6       104       858        96
VIS    2025250     20200   19.3100  140.9400      13.9        97       849        92
VIS    2025250     20200   19.3300  140.8800      14.0       103       874        94
VIS    2025250     20200   19.3300  140.8600      13.6       108       876        98
VIS    2025250     20200   19.3200  140.8300      15.4       109       876        97
VIS    2025250     20200   19.3300  140.8200      15.8       107       884        97
VIS    2025250     20200   19.3100  140.7400      11.9       110       887        91
VIS    2025250     20200   19.3200  140.7200      14.6        96       888        92
VIS    2025250     20200   19.3100  140.6900      13.2       108       886        92
VIS    2025250     20200   19.3100  140.6800      13.3       109       886        92
VIS    2025250     20200   19.3300  140.6300      14.5       104       878        96
VIS    2025250     20200   19.3200  140.6100      13.9       104       872        95
VIS    2025250     20200   19.3200  140.5800      13.2       108       871        96
VIS    2025250     20200   19.3200  140.5700      12.5       111       868        97
VIS    2025250     20200   19.3200  140.5600      12.2       112       868        98
VIS    2025250     20200   19.3100  140.5300      11.8       115       865        97
VIS    2025250     20200   19.3100  140.4900      12.4       125       871        97
VIS    2025250     20200   19.3300  140.4800      12.7       124       877        95
VIS    2025250     20200   19.3100  140.4600      13.4       126       877        98
VIS    2025250     20200   19.3200  140.4300      13.0       121       872        99
VIS    2025250     20200   19.3200  140.4100      12.2       121       869        97
VIS    2025250     20200   19.3200  140.3800      12.0       123       862        97
VIS    2025250     20200   19.3300  140.3600      11.7       122       860        95
VIS    2025250     20200   19.3600  149.2100       5.8        72       986        90
VIS    2025250     20200   19.3700  149.1700       5.0        79       926        90
VIS    2025250     20200   19.3500  148.6400       6.4        70       978        97
VIS    2025250     20200   19.3700  148.6200       6.0        65       974        94
VIS    2025250     20200   19.3600  148.6000       6.3        68       974        92
VIS    2025250     20200   19.3500  148.4500       6.7        64       975        98
VIS    2025250     20200   19.3400  146.7000       9.8        50       977        93
VIS    2025250     20200   19.3300  146.6700       8.4        54       951        93
VIS    2025250     20200   19.3300  146.4200       9.4        52       973        97
VIS    2025250     20200   19.3300  146.4100       9.5        52       973        97
VIS    2025250     20200   19.3400  146.3900       9.5        51       986        95
VIS    2025250     20200   19.3100  145.3800      11.5        54       972        90
VIS    2025250     20200   19.3300  145.3500      10.5        54       947        92
VIS    2025250     20200   19.3300  145.3100      11.2        51       930        97
VIS    2025250     20200   19.3300  145.2800      12.1        49       930        95
VIS    2025250     20200   19.3300  145.2800      12.1        48       930        95
VIS    2025250     20200   19.3300  145.2500      11.3        46       897        90
VIS    2025250     20200   19.3300  145.2000      10.4        64       950        94
VIS    2025250     20200   19.3100  144.9100      10.9        50       989       100
VIS    2025250     20200   19.3300  144.6400      10.6        56       971        98
VIS    2025250     20200   19.3100  144.5900       8.1        92       799        96
VIS    2025250     20200   19.3100  144.5700       8.5        91       733        97
VIS    2025250     20200   19.3200  144.2400       9.1        88       726        94
VIS    2025250     20200   19.3200  144.2300       8.9        88       738        95
VIS    2025250     20200   19.3200  144.2000       9.0        91       745        97
VIS    2025250     20200   19.3100  144.1700       9.0        94       722        96
VIS    2025250     20200   19.3200  144.1600       8.8        94       706        94
VIS    2025250     20200   19.3100  144.1200       9.3        97       712        97
VIS    2025250     20200   19.3200  144.1100       9.4        97       712        97
VIS    2025250     20200   19.3000  144.0800       9.2        93       701        96
VIS    2025250     20200   19.3200  144.0600       9.2        94       702        96
VIS    2025250     20200   19.3000  144.0200      10.1        91       775        97
VIS    2025250     20200   19.3200  143.9900       9.9        94       755        98
VIS    2025250     20200   19.3100  143.9800      10.0        93       747        97
VIS    2025250     20200   19.3000  143.9400      10.0        85       750        95
VIS    2025250     20200   19.3000  143.9300      10.0        84       750        95
VIS    2025250     20200   19.3100  143.9200       9.9        90       769        97
VIS    2025250     20200   19.3000  143.8200       9.4        82       786        92
VIS    2025250     20200   19.3000  143.8200       9.6        82       776        94
VIS    2025250     20200   19.3000  143.7700      10.5        88       744        94
VIS    2025250     20200   19.3100  143.7500      10.8        88       726        93
VIS    2025250     20200   19.3100  143.7400      10.9        87       726        92
VIS    2025250     20200   19.3000  143.7100      11.1        95       728        91
VIS    2025250     20200   19.3000  143.6800      11.4       106       730        99
VIS    2025250     20200   19.3100  143.6700      11.4       110       725        99
VIS    2025250     20200   19.3200  143.6100      12.2       100       709        97
VIS    2025250     20200   19.3100  143.6000      11.9       101       705        98
VIS    2025250     20200   19.3000  143.5100      11.2       103       709        95
VIS    2025250     20200   19.3000  143.4900      11.8       100       720        95
VIS    2025250     20200   19.3000  143.3400      14.0        94       709        92
VIS    2025250     20200   19.3000  143.3100      13.4        91       713        90
VIS    2025250     20200   19.3100  143.2900      13.8        96       755        91
VIS    2025250     20200   19.3000  143.2800      13.1        97       755        92
VIS    2025250     20200   19.3000  143.2400      13.6        95       765        92
VIS    2025250     20200   19.3000  143.2300      14.0        94       766        91
VIS    2025250     20200   19.3200  143.1900      14.1        89       783        90
VIS    2025250     20200   19.3200  143.0700      15.7        67       883        90
VIS    2025250     20200   19.3200  143.0600      15.8        66       889        90
VIS    2025250     20200   19.3200  143.0200      15.0        70       891        94
VIS    2025250     20200   19.3200  143.0000      14.9        66       891        92
VIS    2025250     20200   19.3000  142.9700      14.6        64       883        90
VIS    2025250     20200   19.3100  142.9500      15.2        63       881        90
VIS    2025250     20200   19.3100  142.9400      15.4        65       880        90
VIS    2025250     20200   19.3100  141.5700      12.7       116       854        96
VIS    2025250     20200   19.2900  141.5600      13.7       122       854        96
VIS    2025250     20200   19.3000  141.5300      13.1       112       858        99
VIS    2025250     20200   19.3000  141.4700      12.1        99       852        96
VIS    2025250     20200   19.3000  141.4600      12.1       100       855        96
VIS    2025250     20200   19.3000  141.4200      13.8       106       847        97
VIS    2025250     20200   19.2900  141.4100      14.3       107       834        94
VIS    2025250     20200   19.3000  141.3700      14.9        95       850        92
VIS    2025250     20200   19.3000  141.3200      13.9       109       851        95
VIS    2025250     20200   19.2900  141.3100      13.9       115       848        94
VIS    2025250     20200   19.3000  141.2800      13.6       115       845        99
VIS    2025250     20200   19.3100  141.2100      13.3       103       858        95
VIS    2025250     20200   19.2900  141.1800      13.9       103       852        95
VIS    2025250     20200   19.2900  141.1500      15.1       103       862        94
VIS    2025250     20200   19.2900  141.1500      15.3       102       863        94
VIS    2025250     20200   19.3100  141.0700      14.8        92       863        90
VIS    2025250     20200   19.3000  141.0000      12.9        98       864        93
VIS    2025250     20200   19.2900  140.9600      12.8        97       858        93
VIS    2025250     20200   19.2900  140.9500      12.9        95       858        92
VIS    2025250     20200   19.2900  140.9100      13.8       103       847        93
VIS    2025250     20200   19.2800  140.9000      14.1       104       847        94
VIS    2025250     20200   19.2900  140.8700      14.8       104       821        92
VIS    2025250     20200   19.3000  140.8200      17.0       113       838        92
VIS    2025250     20200   19.2800  140.8000      16.0       110       822        92
VIS    2025250     20200   19.2800  140.7400      11.4       107       863        93
VIS    2025250     20200   19.2800  140.7300      11.3       105       863        93
VIS    2025250     20200   19.3000  140.7000      12.9       105       885        92
VIS    2025250     20200   19.2900  140.6700      12.5       115       866        90
VIS    2025250     20200   19.3000  140.6300      13.9       103       862        94
VIS    2025250     20200   19.2900  140.6100      13.1       107       856        94
VIS    2025250     20200   19.2900  140.5800      12.7       115       855        97
VIS    2025250     20200   19.3000  140.5500      12.1       118       856        99
VIS    2025250     20200   19.3000  140.5300      11.8       114       858        98
VIS    2025250     20200   19.3000  140.5100      11.9       119       858        98
VIS    2025250     20200   19.3000  140.4900      12.2       127       858        97
VIS    2025250     20200   19.2900  140.4700      12.6       129       863        98
VIS    2025250     20200   19.2900  140.4400      13.3       118       870        97
VIS    2025250     20200   19.2900  140.4000      13.0       116       869        95
VIS    2025250     20200   19.2800  140.3900      13.3       121       868        98
VIS    2025250     20200   19.2800  140.3700      13.5       127       864        98
VIS    2025250     20200   19.3300  149.1900       6.3        68       965        93
VIS    2025250     20200   19.3300  149.1700       6.1        67       961        94
VIS    2025250     20200   19.3400  148.6200       6.6        72       983        98
VIS    2025250     20200   19.3400  148.4700       7.9        78       974        92
VIS    2025250     20200   19.3200  146.6800       8.5        53       951        94
VIS    2025250     20200   19.3200  146.6500       8.5        55       947        92
VIS    2025250     20200   19.3200  146.6400       8.6        57       947        91
VIS    2025250     20200   19.3100  146.3600       9.6        51       978        96
VIS    2025250     20200   19.3200  146.3300       9.9        50       966        97
VIS    2025250     20200   19.3000  145.4700       8.8        76       941        92
VIS    2025250     20200   19.2900  145.4000      10.6        58       972        94
VIS    2025250     20200   19.3000  145.3800      11.5        55       972        97
VIS    2025250     20200   19.2900  145.3500      11.1        52       927        96
VIS    2025250     20200   19.2900  145.3300      10.6        50       925        97
VIS    2025250     20200   19.2900  145.3100      10.4        49       925        97
VIS    2025250     20200   19.2900  145.2900      11.2        50       937        97
VIS    2025250     20200   19.2900  145.1800      11.1        88       797        92
VIS    2025250     20200   19.2900  145.1600      10.9        99       781        92
VIS    2025250     20200   19.2800  144.9300      11.1        48       989        99
VIS    2025250     20200   19.3000  144.9100      10.9        49       989       100
VIS    2025250     20200   19.2800  144.5700       8.9        92       702        96
VIS    2025250     20200   19.2800  144.5600       8.9        91       702        96
VIS    2025250     20200   19.3000  144.1200       8.8        96       712        97
VIS    2025250     20200   19.2900  144.0900       9.0        93       701        96
VIS    2025250     20200   19.2800  144.0700       8.9        92       727        97
VIS    2025250     20200   19.2800  144.0300      10.1        85       792        95
VIS    2025250     20200   19.2900  144.0200      10.2        88       789        96
VIS    2025250     20200   19.2900  143.9900      10.9        85       789        95
VIS    2025250     20200   19.2900  143.9800      10.8        83       789        93
VIS    2025250     20200   19.2800  143.8900      10.0        88       786        91
VIS    2025250     20200   19.2900  143.8700       9.2        92       793        91
VIS    2025250     20200   19.3000  143.8100       9.8        84       770        94
VIS    2025250     20200   19.2900  143.8100      10.1        85       769        94
VIS    2025250     20200   19.2900  143.7700      10.8        87       746        94
VIS    2025250     20200   19.2800  143.7500      11.2        85       731        90
VIS    2025250     20200   19.3000  143.7200      11.2        89       728        90
VIS    2025250     20200   19.2800  143.6900      11.9        99       730        97
VIS    2025250     20200   19.2900  143.6800      11.5       106       728        99
VIS    2025250     20200   19.2800  143.6500      12.7        98       719        95
VIS    2025250     20200   19.2900  143.6300      12.7        99       719        95
VIS    2025250     20200   19.2800  143.5900      12.1       104       705        98
VIS    2025250     20200   19.2700  143.5000      10.8       105       707        96
VIS    2025250     20200   19.2900  143.4900      11.6       102       712        95
VIS    2025250     20200   19.2800  143.3500      13.8        93       744        90
VIS    2025250     20200   19.2800  143.3400      13.1        93       730        93
VIS    2025250     20200   19.2900  143.2500      13.6        94       755        92
VIS    2025250     20200   19.2900  143.2500      13.8        94       765        92
VIS    2025250     20200   19.2800  143.2200      14.5        93       772        91
VIS    2025250     20200   19.2900  143.0800      14.6        79       842        90
VIS    2025250     20200   19.2800  143.0400      13.5        85       826        93
VIS    2025250     20200   19.2800  143.0200      15.2        82       841        91
VIS    2025250     20200   19.2700  143.0000      13.9        83       841        93
VIS    2025250     20200   19.2800  141.5500      15.3       120       850        93
VIS    2025250     20200   19.2700  141.5500      15.6       118       843        94
VIS    2025250     20200   19.2700  141.5200      13.9       107       841        95
VIS    2025250     20200   19.2800  141.5000      13.2       102       841        90
VIS    2025250     20200   19.2700  141.4200      14.1       111       817        96
VIS    2025250     20200   19.2600  141.3800      12.6       112       793        98
VIS    2025250     20200   19.2800  141.3600      13.8       103       823        94
VIS    2025250     20200   19.2800  141.3100      14.5       122       820        95
VIS    2025250     20200   19.2800  141.3000      14.9       124       820        95
VIS    2025250     20200   19.2800  141.2700      13.2       114       820        96
VIS    2025250     20200   19.2600  141.1800      15.5       107       851        90
VIS    2025250     20200   19.2800  141.1400      16.0       105       862        93
VIS    2025250     20200   19.2700  141.0800      14.0       100       848        91
VIS    2025250     20200   19.2700  141.0600      14.7        97       863        90
VIS    2025250     20200   19.2800  141.0100      15.8        88       879        90
VIS    2025250     20200   19.2600  140.9800      12.1       113       870        97
VIS    2025250     20200   19.2800  140.9600      12.6        95       863        92
VIS    2025250     20200   19.2600  140.9400      13.1        94       853        92
VIS    2025250     20200   19.2600  140.9100      14.7       104       847        91
VIS    2025250     20200   19.2600  140.8900      14.7       113       836        93
VIS    2025250     20200   19.2800  140.8000      15.8       108       822        93
VIS    2025250     20200   19.2600  140.7800      12.8       109       848        97
VIS    2025250     20200   19.2600  140.7700      12.6       109       848        96
VIS    2025250     20200   19.2800  140.7300      11.3       105       863        94
VIS    2025250     20200   19.2600  140.7000      11.9       115       855        99
VIS    2025250     20200   19.2600  140.7000      11.7       116       856        99
VIS    2025250     20200   19.2600  140.6800      11.9       121       857        97
VIS    2025250     20200   19.2600  140.6500      12.0       117       857        92
VIS    2025250     20200   19.2800  140.5800      13.1       115       853        96
VIS    2025250     20200   19.2700  140.5800      13.3       117       853        97
VIS    2025250     20200   19.2800  140.5500      12.5       120       853        99
VIS    2025250     20200   19.2700  140.5200      12.6       123       844        98
VIS    2025250     20200   19.2600  140.4900      13.0       126       858        99
VIS    2025250     20200   19.2700  140.4600      12.6       123       858        99
VIS    2025250     20200   19.2700  140.4600      12.6       121       858        99
VIS    2025250     20200   19.2700  140.3900      13.2       120       867        98
VIS    2025250     20200   19.2700  140.3700      13.6       131       864        96
VIS    2025250     20200   19.2700  140.3600      13.7       132       862        96
VIS    2025250     20200   19.3100  149.7000       7.5        57       907        93
VIS    2025250     20200   19.3200  149.1900       6.7        73       965        95
VIS    2025250     20200   19.3200  149.1700       6.3        67       961        95
VIS    2025250     20200   19.3200  149.1600       6.0        64       959        96
VIS    2025250     20200   19.3100  148.4800       8.0        79       990        91
VIS    2025250     20200   19.3000  147.0300       9.5        49       983        90
VIS    2025250     20200   19.2800  146.9800       9.7        52       983        95
VIS    2025250     20200   19.2800  146.9000       9.4        45       973        91
VIS    2025250     20200   19.2800  146.8900       9.6        45       967        90
VIS    2025250     20200   19.2800  146.8700       9.3        46       950        92
VIS    2025250     20200   19.2800  146.8000       8.8        55       955        94
VIS    2025250     20200   19.2900  146.7100       8.6        53       960        92
VIS    2025250     20200   19.2900  146.6600       8.5        46       925        96
VIS    2025250     20200   19.2900  146.3400       9.7        50       978        97
VIS    2025250     20200   19.2700  145.4500       9.9        63       949        94
VIS    2025250     20200   19.2700  145.4300      10.0        62       960        91
VIS    2025250     20200   19.2800  145.4100      10.2        58       961        90
VIS    2025250     20200   19.2700  145.3900      10.8        54       961        98
VIS    2025250     20200   19.2800  145.3700      11.4        54       961        98
VIS    2025250     20200   19.2700  145.3500      10.8        51       925        96
VIS    2025250     20200   19.2800  145.3100      10.4        48       925        96
VIS    2025250     20200   19.2800  145.3000      10.7        47       927        95
VIS    2025250     20200   19.2800  145.1600      11.3        95       781        90
VIS    2025250     20200   19.2800  144.9300      11.4        48       989        99
VIS    2025250     20200   19.2700  144.9300      11.0        50       989       100
VIS    2025250     20200   19.2700  144.9000      10.6        55       974        97
VIS    2025250     20200   19.2600  144.7700      11.5        50       977        93
VIS    2025250     20200   19.2600  144.7600      11.7        48       964        92
VIS    2025250     20200   19.2800  144.5700       9.0        92       702        96
VIS    2025250     20200   19.2700  144.1300       8.6        91       724        96
VIS    2025250     20200   19.2700  144.1100       8.1        89       727        95
VIS    2025250     20200   19.2600  144.1000       8.1        87       728        94
VIS    2025250     20200   19.2600  144.0700       8.7        89       739        95
VIS    2025250     20200   19.2500  144.0400      10.0        90       795        91
VIS    2025250     20200   19.2600  144.0100      11.3        83       812        93
VIS    2025250     20200   19.2600  144.0000      11.7        80       832        93
VIS    2025250     20200   19.2600  143.8900      10.2        86       793        91
VIS    2025250     20200   19.2600  143.8600       9.5        90       793        94
VIS    2025250     20200   19.2600  143.8400       9.4        87       786        95
VIS    2025250     20200   19.2600  143.8300       9.7        85       769        95
VIS    2025250     20200   19.2600  143.7900      11.2        88       749        94
VIS    2025250     20200   19.2700  143.7700      11.3        88       746        94
VIS    2025250     20200   19.2700  143.7600      11.4        88       746        94
VIS    2025250     20200   19.2600  143.7300      11.8        89       737        91
VIS    2025250     20200   19.2700  143.6900      11.9        97       730        96
VIS    2025250     20200   19.2700  143.6900      12.0        98       728        96
VIS    2025250     20200   19.2700  143.6600      12.5        99       719        91
VIS    2025250     20200   19.2700  143.6000      12.5        97       709        95
VIS    2025250     20200   19.2500  143.4700      11.4        94       733        95
VIS    2025250     20200   19.2500  143.3700      12.1        87       752        92
VIS    2025250     20200   19.2700  143.3300      12.1        92       707        94
VIS    2025250     20200   19.2700  143.3100      11.5        87       707        90
VIS    2025250     20200   19.2700  143.2300      14.6        92       766        90
VIS    2025250     20200   19.2600  143.1300      14.1        88       818        90
VIS    2025250     20200   19.2600  143.0000      13.2        87       826        95
VIS    2025250     20200   19.2700  142.9700      13.7        70       853        90
VIS    2025250     20200   19.2600  141.5800      16.2       119       801        91
VIS    2025250     20200   19.2500  141.5600      14.3       120       801       100
VIS    2025250     20200   19.2400  141.5400      13.4       121       769       100
VIS    2025250     20200   19.2600  141.5300      13.9       113       841        99
VIS    2025250     20200   19.2400  141.4200      12.4       126       712        95
VIS    2025250     20200   19.2600  141.4000      12.0       116       805        97
VIS    2025250     20200   19.2500  141.3700      13.5       118       790        98
VIS    2025250     20200   19.2400  141.3600      14.8       119       739        98
VIS    2025250     20200   19.2400  141.2800      15.7       121       707        91
VIS    2025250     20200   19.2400  141.1700      15.2       116       838        90
VIS    2025250     20200   19.2400  141.1400      16.2       116       734        92
VIS    2025250     20200   19.2500  141.1000      14.6       110       734        90
VIS    2025250     20200   19.2600  141.0800      14.0       107       782        90
VIS    2025250     20200   19.2500  141.0500      14.5       114       744        96
VIS    2025250     20200   19.2500  141.0400      14.4       110       792        92
VIS    2025250     20200   19.2400  140.9900      15.5       128       792        95
VIS    2025250     20200   19.2400  140.9500      12.5       111       823        97
VIS    2025250     20200   19.2500  140.9400      12.9        97       853        93
VIS    2025250     20200   19.2500  140.9200      14.7       106       847        93
VIS    2025250     20200   19.2500  140.7800      12.9       109       847        98
VIS    2025250     20200   19.2500  140.7800      12.9       109       848        98
VIS    2025250     20200   19.2500  140.7300      12.9       109       821        97
VIS    2025250     20200   19.2500  140.7100      12.6       116       842        98
VIS    2025250     20200   19.2500  140.7000      12.1       117       855        99
VIS    2025250     20200   19.2500  140.6800      12.5       124       857        98
VIS    2025250     20200   19.2300  140.6500      13.1       127       857        94
VIS    2025250     20200   19.2300  140.6100      13.6       126       849        93
VIS    2025250     20200   19.2500  140.6100      13.1       121       849        91
VIS    2025250     20200   19.2400  140.5600      14.0       131       859        94
VIS    2025250     20200   19.2400  140.5600      14.0       131       859        94
VIS    2025250     20200   19.2300  140.5300      14.9       131       861        95
VIS    2025250     20200   19.2500  140.4900      13.5       127       855        98
VIS    2025250     20200   19.2500  140.4900      13.3       126       858        99
VIS    2025250     20200   19.2500  140.4600      12.9       115       866        98
VIS    2025250     20200   19.2500  140.3900      13.0       116       866        99
VIS    2025250     20200   19.2300  140.3800      13.2       125       861        99
VIS    2025250     20200   19.3100  149.7000       7.6        58       907        93
VIS    2025250     20200   19.3000  149.7000       7.7        57       907        93
VIS    2025250     20200   19.2900  149.2000       6.9        78       998        93
VIS    2025250     20200   19.2800  149.1700       6.6        73       979        97
VIS    2025250     20200   19.2900  149.1600       6.1        70       973        95
VIS    2025250     20200   19.3000  149.1200       4.4        63       955        92
VIS    2025250     20200   19.2900  149.1100       4.4        64       955        91
VIS    2025250     20200   19.2700  148.5000       7.2        74       993        96
VIS    2025250     20200   19.2700  148.4800       7.4        79       984        94
VIS    2025250     20200   19.2700  146.9000       9.5        45       973        92
VIS    2025250     20200   19.2700  146.8800       9.4        45       950        94
VIS    2025250     20200   19.2600  146.8500       8.7        47       950        95
VIS    2025250     20200   19.2600  146.8300       8.5        48       950        96
VIS    2025250     20200   19.2700  146.8100       8.6        54       950        97
VIS    2025250     20200   19.2700  146.7800       8.5        54       964        97
VIS    2025250     20200   19.2600  146.7400       8.8        54       963        96
VIS    2025250     20200   19.2600  146.7100       8.7        51       934        98
VIS    2025250     20200   19.2700  146.7000       8.5        49       928        96
VIS    2025250     20200   19.2700  146.6500       8.6        47       932        98
VIS    2025250     20200   19.2700  146.6500       8.6        48       940        99
VIS    2025250     20200   19.2400  145.4700       9.8        63       971        93
VIS    2025250     20200   19.2400  145.4600      10.1        64       961        95
VIS    2025250     20200   19.2400  145.4300      10.2        62       961        96
VIS    2025250     20200   19.2500  145.4000      10.5        57       960        97
VIS    2025250     20200   19.2400  145.3900      10.7        56       947        99
VIS    2025250     20200   19.2400  145.3400      10.3        51       921        96
VIS    2025250     20200   19.2400  145.3400      10.4        50       911        94
VIS    2025250     20200   19.2400  145.2900      10.7        49       914        95
VIS    2025250     20200   19.2500  145.2700      11.3        56       922        91
VIS    2025250     20200   19.2300  144.9400       8.8        68       922        96
VIS    2025250     20200   19.2500  144.9300      10.5        58       940        99
VIS    2025250     20200   19.2400  144.9100      10.4        59       885        97
VIS    2025250     20200   19.2500  144.7700      11.3        49       971        94
VIS    2025250     20200   19.2400  144.7600      11.7        46       964        98
VIS    2025250     20200   19.2300  144.7400      12.3        44       964        98
VIS    2025250     20200   19.2300  144.7200      13.3        43       953        96
VIS    2025250     20200   19.2300  144.6500       8.2        87       799        96
VIS    2025250     20200   19.2500  144.1100       8.2        84       728        94
VIS    2025250     20200   19.2300  144.0900       8.5        82       768        93
VIS    2025250     20200   19.2300  144.0800       8.7        85       770        93
VIS    2025250     20200   19.2500  144.0400      10.1        91       795        92
VIS    2025250     20200   19.2300  144.0200      11.0        88       783        97
VIS    2025250     20200   19.2500  144.0100      11.4        82       812        90
VIS    2025250     20200   19.2300  143.9800      11.8        71       843        96
VIS    2025250     20200   19.2400  143.8700       9.8        92       793        91
VIS    2025250     20200   19.2400  143.8400      10.0        90       786        91
VIS    2025250     20200   19.2400  143.8200      11.1        92       757        90
VIS    2025250     20200   19.2300  143.7800      12.0        93       754        94
VIS    2025250     20200   19.2400  143.7600      12.0        92       754        94
VIS    2025250     20200   19.2500  143.7200      11.9        89       738        92
VIS    2025250     20200   19.2400  143.7200      11.9        88       732        93
VIS    2025250     20200   19.2400  143.6800      12.6        90       714        92
VIS    2025250     20200   19.2300  143.4900      11.5        96       721        95
VIS    2025250     20200   19.2300  143.4600      12.3        91       746        90
VIS    2025250     20200   19.2400  143.4400      12.1        92       754        91
VIS    2025250     20200   19.2300  143.4200      12.5        93       752        91
VIS    2025250     20200   19.2400  143.3800      12.0        86       752        91
VIS    2025250     20200   19.2400  143.3800      11.8        87       752        92
VIS    2025250     20200   19.2300  143.2800      12.8        90       734        90
VIS    2025250     20200   19.2300  143.2600      12.9        86       763        92
VIS    2025250     20200   19.2300  143.2500      13.0        87       754        91
VIS    2025250     20200   19.2200  143.1600      13.0        78       821        94
VIS    2025250     20200   19.2300  141.5400      12.8       124       769        99
VIS    2025250     20200   19.2300  141.3900      12.9       126       739        97
VIS    2025250     20200   19.2300  141.0200      16.1       124       744        95
VIS    2025250     20200   19.2300  140.9800      14.0       125       761        97
VIS    2025250     20200   19.2300  140.9700      13.3       122       804        97
VIS    2025250     20200   19.2300  140.9300      13.9       112       813        96
VIS    2025250     20200   19.2200  140.9100      15.5       117       842        99
VIS    2025250     20200   19.2100  140.8200      12.1       105       833        93
VIS    2025250     20200   19.2200  140.8000      12.7       115       839        97
VIS    2025250     20200   19.2100  140.7800      14.8       124       778        97
VIS    2025250     20200   19.2100  140.7400      14.7       117       778        96
VIS    2025250     20200   19.2200  140.7200      13.7       118       814        98
VIS    2025250     20200   19.2300  140.7100      13.3       121       821        99
VIS    2025250     20200   19.2300  140.6700      13.0       126       855        98
VIS    2025250     20200   19.2100  140.6500      13.5       127       840        98
VIS    2025250     20200   19.2100  140.6200      13.7       130       856        98
VIS    2025250     20200   19.2200  140.6100      13.7       129       853        96
VIS    2025250     20200   19.2100  140.5700      14.1       130       860        98
VIS    2025250     20200   19.2300  140.5600      14.1       132       861        93
VIS    2025250     20200   19.2100  140.5300      15.3       129       863        98
VIS    2025250     20200   19.2200  140.5000      14.8       125       863        99
VIS    2025250     20200   19.2100  140.4800      13.6       121       863        97
VIS    2025250     20200   19.2300  140.4600      12.3       114       864        90
VIS    2025250     20200   19.2200  140.4200      12.1       112       860        93
VIS    2025250     20200   19.2200  140.4000      12.6       117       860        98
VIS    2025250     20200   19.2100  140.3700      13.7       128       861        98
VIS    2025250     20200   19.2100  140.3600      14.2       134       863        96
VIS    2025250     20200   19.2600  149.1700       6.2        66       979        91
VIS    2025250     20200   19.2600  149.1200       4.6        67       956        91
VIS    2025250     20200   19.2700  149.0900       4.0        68       956        93
VIS    2025250     20200   19.2700  148.4900       7.4        74       992        96
VIS    2025250     20200   19.2500  146.8300       8.2        48       948       100
VIS    2025250     20200   19.2200  145.4500      10.2        61       970        97
VIS    2025250     20200   19.2300  145.4200      10.6        60       960        98
VIS    2025250     20200   19.2300  145.3900      10.9        57       947        99
VIS    2025250     20200   19.2200  145.3700      10.8        55       936        99
VIS    2025250     20200   19.2300  145.3400      10.5        50       911        97
VIS    2025250     20200   19.2100  145.3200      10.7        48       901        97
VIS    2025250     20200   19.2200  145.3000      10.6        48       904        97
VIS    2025250     20200   19.2200  145.2800      10.4        53       914        98
VIS    2025250     20200   19.2100  145.1700      11.5        89       782        92
VIS    2025250     20200   19.2100  145.1600      11.5        88       829        95
VIS    2025250     20200   19.2200  145.1300      10.2        88       917        90
VIS    2025250     20200   19.2200  144.9500       7.8        77       922        92
VIS    2025250     20200   19.2300  144.9200       9.3        67       885        99
VIS    2025250     20200   19.2200  144.9200       9.3        65       885        99
VIS    2025250     20200   19.2100  144.8000      10.6        55       930        90
VIS    2025250     20200   19.2100  144.7800      10.8        48       930        93
VIS    2025250     20200   19.2100  144.7600      11.2        46       924        95
VIS    2025250     20200   19.2200  144.7400      12.3        44       939        96
VIS    2025250     20200   19.2100  144.7200      12.7        49       939        96
VIS    2025250     20200   19.2200  144.6900      12.5        56       965        96
VIS    2025250     20200   19.2200  144.6600       8.6        81       879        93
VIS    2025250     20200   19.2300  144.6400       8.4        88       764        93
VIS    2025250     20200   19.2100  144.6000       9.0        92       715        97
VIS    2025250     20200   19.2200  144.1000       8.9        81       768        95
VIS    2025250     20200   19.2200  144.0800       8.9        84       770        94
VIS    2025250     20200   19.2100  144.0600       9.4        92       799        96
VIS    2025250     20200   19.2200  144.0200      11.0        89       783        97
VIS    2025250     20200   19.2200  144.0100      11.1        88       799        98
VIS    2025250     20200   19.2100  143.9700      10.1        76       846        93
VIS    2025250     20200   19.2100  143.9600      10.0        74       846        93
VIS    2025250     20200   19.2100  143.9300       9.6        80       834        93
VIS    2025250     20200   19.2100  143.8600      10.7        94       785        92
VIS    2025250     20200   19.2100  143.8400      11.7        92       749        91
VIS    2025250     20200   19.2100  143.8000      11.9        89       752        91
VIS    2025250     20200   19.2100  143.7700      11.8        92       756        93
VIS    2025250     20200   19.2100  143.7700      11.7        90       752        93
VIS    2025250     20200   19.2200  143.7400      11.8        90       738        95
VIS    2025250     20200   19.2200  143.7100      11.6        84       716        91
VIS    2025250     20200   19.2200  143.6900      12.7        86       714        90
VIS    2025250     20200   19.2000  143.4200      13.1        92       727        93
VIS    2025250     20200   19.2100  143.3000      13.6        91       774        93
VIS    2025250     20200   19.2100  143.2700      13.5        83       774        92
VIS    2025250     20200   19.2000  143.1700      12.5        82       844        93
VIS    2025250     20200   19.2000  143.1500      12.4        75       844        96
VIS    2025250     20200   19.2100  143.1400      13.7        71       838        94
VIS    2025250     20200   19.2100  141.3900      14.0       120       701        92
VIS    2025250     20200   19.1900  140.9300      15.4       118       740        96
VIS    2025250     20200   19.2000  140.9100      14.2       122       775       100
VIS    2025250     20200   19.2000  140.8900      13.2       123       822        99
VIS    2025250     20200   19.1900  140.8700      12.8       120       766        99
VIS    2025250     20200   19.2000  140.8200      12.2       113       824        94
VIS    2025250     20200   19.1800  140.6900      14.0       123       739        92
VIS    2025250     20200   19.1800  140.6900      13.6       124       745        94
VIS    2025250     20200   19.2000  140.6400      13.5       127       848        98
VIS    2025250     20200   19.2000  140.6200      13.6       130       856        97
VIS    2025250     20200   19.2000  140.6200      13.6       131       856        97
VIS    2025250     20200   19.1900  140.5900      13.3       131       856        98
VIS    2025250     20200   19.2000  140.5700      14.5       129       860        99
VIS    2025250     20200   19.1900  140.5400      15.6       127       864        98
VIS    2025250     20200   19.1900  140.5200      15.5       127       864        98
VIS    2025250     20200   19.1900  140.4900      14.7       123       856        97
VIS    2025250     20200   19.1800  140.4300      12.1       123       853        94
VIS    2025250     20200   19.1800  140.4200      12.4       123       855        97
VIS    2025250     20200   19.1900  140.3800      13.5       127       857        98
VIS    2025250     20200   19.1900  140.3700      13.9       129       857        97
VIS    2025250     20200   19.2300  149.2000       7.0        53       994        91
VIS    2025250     20200   19.2300  149.1600       6.1        65       953        96
VIS    2025250     20200   19.2300  149.1500       6.1        68       935        91
VIS    2025250     20200   19.2200  148.4700       7.2        74       972        96
VIS    2025250     20200   19.2000  147.0600       8.8        49       980        92
VIS    2025250     20200   19.2000  147.0500       9.0        48       978        93
VIS    2025250     20200   19.2000  147.0200       9.3        46       976        93
VIS    2025250     20200   19.2000  145.4600      10.1        58       971        97
VIS    2025250     20200   19.2000  145.4300      10.6        57       970        98
VIS    2025250     20200   19.1900  145.4100      11.1        59       970        98
VIS    2025250     20200   19.2100  145.4000      11.3        58       957        99
VIS    2025250     20200   19.1900  145.3700      11.1        51       911        97
VIS    2025250     20200   19.1900  145.3400      11.1        49       904        96
VIS    2025250     20200   19.1900  145.3300      11.1        49       891        95
VIS    2025250     20200   19.2000  145.3000      10.6        47       901        96
VIS    2025250     20200   19.2000  145.2700      10.3        55       906        97
VIS    2025250     20200   19.1900  145.2500      10.6        63       895        98
VIS    2025250     20200   19.2000  145.2200      11.1        86       871        91
VIS    2025250     20200   19.2100  145.1700      11.5        86       793        93
VIS    2025250     20200   19.2100  145.1600      11.4        86       793        93
VIS    2025250     20200   19.2000  145.1400       9.7        84       871        97
VIS    2025250     20200   19.2000  144.8000      10.7        53       927        93
VIS    2025250     20200   19.1800  144.7800      10.9        50       903        92
VIS    2025250     20200   19.1800  144.7200      11.8        53       915        98
VIS    2025250     20200   19.1800  144.7200      11.9        55       924        98
VIS    2025250     20200   19.1900  144.6900      10.8        66       949        95
VIS    2025250     20200   19.2000  144.6500       8.5        86       819        98
VIS    2025250     20200   19.1900  144.6300       8.5        90       747        98
VIS    2025250     20200   19.2000  144.6000       9.0        92       728        98
VIS    2025250     20200   19.2000  144.0900       8.9        86       788        98
VIS    2025250     20200   19.1900  144.0700       9.0        89       790       100
VIS    2025250     20200   19.1800  144.0500       9.4        87       775        96
VIS    2025250     20200   19.1800  144.0300      10.6        83       784        97
VIS    2025250     20200   19.1800  144.0000      10.6        85       832        99
VIS    2025250     20200   19.1800  143.9700       8.6        82       832        93
VIS    2025250     20200   19.1800  143.9500       8.6        83       832        94
VIS    2025250     20200   19.2000  143.9400       9.3        81       859        93
VIS    2025250     20200   19.1900  143.9100       9.9        90       853        92
VIS    2025250     20200   19.1900  143.8700      10.9        93       775        97
VIS    2025250     20200   19.1900  143.8600      11.4        94       757        96
VIS    2025250     20200   19.1800  143.8400      12.0        93       748        94
VIS    2025250     20200   19.1800  143.8000      11.5        89       752        93
VIS    2025250     20200   19.2000  143.7800      11.5        88       752        93
VIS    2025250     20200   19.1900  143.7700      11.3        88       746        93
VIS    2025250     20200   19.1900  143.7400      10.9        86       718        94
VIS    2025250     20200   19.1900  143.7000      11.9        85       715        92
VIS    2025250     20200   19.1900  143.6900      12.6        85       716        92
VIS    2025250     20200   19.1800  143.6600      13.4        90       709        93
VIS    2025250     20200   19.1800  143.6400      12.7        89       708        92
VIS    2025250     20200   19.1900  143.3000      13.4        85       786        93
VIS    2025250     20200   19.1700  143.2800      13.9        79       777        90
VIS    2025250     20200   19.1700  143.2600      13.5        80       776        91
VIS    2025250     20200   19.1900  143.1500      11.8        75       856        95
VIS    2025250     20200   19.1600  140.8900      14.5       122       707        94
VIS    2025250     20200   19.1700  140.8700      13.7       123       723        98
VIS    2025250     20200   19.1800  140.8600      13.3       126       723        98
VIS    2025250     20200   19.1600  140.7200      15.2       122       787        92
VIS    2025250     20200   19.1600  140.7100      14.9       123       793        93
VIS    2025250     20200   19.1800  140.6900      13.6       124       745        93
VIS    2025250     20200   19.1600  140.6500      13.2       130       820        99
VIS    2025250     20200   19.1700  140.6300      13.1       131       852        98
VIS    2025250     20200   19.1700  140.6000      12.8       130       853        97
VIS    2025250     20200   19.1800  140.5700      14.7       128       856        99
VIS    2025250     20200   19.1700  140.5700      15.2       127       857        99
VIS    2025250     20200   19.1800  140.5300      15.5       126       863        99
VIS    2025250     20200   19.1700  140.5200      15.2       126       863        98
VIS    2025250     20200   19.1600  140.4800      14.5       127       851        97
VIS    2025250     20200   19.1700  140.4600      13.7       125       852        94
VIS    2025250     20200   19.1700  140.4300      12.8       126       853        98
VIS    2025250     20200   19.1700  140.4000      13.4       128       856        98
VIS    2025250     20200   19.1800  140.3900      13.7       128       857        97
VIS    2025250     20200   19.1600  140.3500      14.6       127       860        98
VIS    2025250     20200   19.2200  149.1600       6.0        67       935        95
VIS    2025250     20200   19.2000  149.1000       5.3        70       932        92
VIS    2025250     20200   19.2200  148.5000       7.2        68       983        98
VIS    2025250     20200   19.1900  147.0200       9.3        46       976        95
VIS    2025250     20200   19.1800  146.9400       9.6        47       968        92
VIS    2025250     20200   19.1800  146.9300       9.5        47       968        92
VIS    2025250     20200   19.1800  146.6600       8.7        43       965        90
VIS    2025250     20200   19.1800  145.4600       9.9        54       982        92
VIS    2025250     20200   19.1800  145.4400      10.9        53       982        98
VIS    2025250     20200   19.1800  145.4100      10.9        56       973        99
VIS    2025250     20200   19.1800  145.4000      11.0        56       961        99
VIS    2025250     20200   19.1700  145.3600      10.7        50       911        97
VIS    2025250     20200   19.1600  145.3500      10.6        50       908        97
VIS    2025250     20200   19.1800  145.3100      10.7        49       904        97
VIS    2025250     20200   19.1700  145.3100      10.6        51       904        98
VIS    2025250     20200   19.1800  145.2800      10.4        52       906        97
VIS    2025250     20200   19.1800  145.2600      10.4        62       895        93
VIS    2025250     20200   19.1600  144.8300      11.1        58       928        96
VIS    2025250     20200   19.1700  144.8000      10.8        56       897        92
VIS    2025250     20200   19.1700  144.7800      11.1        51       892        94
VIS    2025250     20200   19.1700  144.7700      11.3        50       903        94
VIS    2025250     20200   19.1800  144.7300      12.0        52       906        96
VIS    2025250     20200   19.1700  144.7200      11.3        60       924       100
VIS    2025250     20200   19.1600  144.6500       8.2        91       778        96
VIS    2025250     20200   19.1600  144.6300       8.1        88       740        96
VIS    2025250     20200   19.1700  144.1000       9.1        91       788        97
VIS    2025250     20200   19.1600  144.0800       9.1        94       793        95
VIS    2025250     20200   19.1600  144.0500       9.5        83       767        90
VIS    2025250     20200   19.1700  144.0200      10.9        76       799        96
VIS    2025250     20200   19.1600  144.0000       9.0        77       826        98
VIS    2025250     20200   19.1700  143.9700       8.6        83       831        92
VIS    2025250     20200   19.1700  143.9500       8.4        84       832        93
VIS    2025250     20200   19.1500  143.9400       9.0        87       845        91
VIS    2025250     20200   19.1700  143.9100      10.0        91       836        96
VIS    2025250     20200   19.1600  143.8900      10.9        91       776        98
VIS    2025250     20200   19.1500  143.8600      11.8        94       757        95
VIS    2025250     20200   19.1500  143.8200      11.4        92       760        95
VIS    2025250     20200   19.1600  143.8100      11.4        91       753        94
VIS    2025250     20200   19.1700  143.7800      11.2        86       746        93
VIS    2025250     20200   19.1700  143.7700      11.0        85       733        93
VIS    2025250     20200   19.1700  143.7300      10.3        82       718        90
VIS    2025250     20200   19.1600  143.7000      11.6        87       712        93
VIS    2025250     20200   19.1700  143.6800      13.1        88       710        92
VIS    2025250     20200   19.1600  143.6600      12.6        88       709        93
VIS    2025250     20200   19.1600  143.3600      11.8        87       761        92
VIS    2025250     20200   19.1600  143.3500      12.3        86       761        91
VIS    2025250     20200   19.1600  143.1400      14.3        62       879        92
VIS    2025250     20200   19.1400  140.7200      13.1       123       816        99
VIS    2025250     20200   19.1400  140.7100      13.5       127       831        98
VIS    2025250     20200   19.1400  140.6800      13.2       130       841        96
VIS    2025250     20200   19.1500  140.6600      13.2       130       820        99
VIS    2025250     20200   19.1500  140.6400      13.5       130       847        99
VIS    2025250     20200   19.1500  140.6100      13.0       131       852        96
VIS    2025250     20200   19.1500  140.5900      14.3       124       853        99
VIS    2025250     20200   19.1300  140.5500      15.2       120       857        98
VIS    2025250     20200   19.1300  140.5400      15.1       121       861        97
VIS    2025250     20200   19.1500  140.5200      14.8       124       864        98
VIS    2025250     20200   19.1400  140.4800      14.6       131       852        97
VIS    2025250     20200   19.1400  140.4700      14.6       131       852        98
VIS    2025250     20200   19.1500  140.4500      13.8       128       853        99
VIS    2025250     20200   19.1500  140.4200      13.4       128       856        98
VIS    2025250     20200   19.1300  140.3800      14.8       125       860        99
VIS    2025250     20200   19.1300  140.3500      15.1       123       861        99
VIS    2025250     20200   19.1900  149.7100       5.3        55       952        95
VIS    2025250     20200   19.1800  148.9600       5.7        59       952        96
VIS    2025250     20200   19.1800  148.9500       6.1        70       975        98
VIS    2025250     20200   19.1700  147.0300       9.3        46       976        98
VIS    2025250     20200   19.1600  146.9500       9.5        47       968        94
VIS    2025250     20200   19.1700  146.9400       9.5        46       968        93
VIS    2025250     20200   19.1700  146.9200       9.5        47       968        92
VIS    2025250     20200   19.1500  146.6900       8.8        55       968        99
VIS    2025250     20200   19.1500  146.6800       8.9        51       949       100
VIS    2025250     20200   19.1600  146.6500       8.5        51       956        98
VIS    2025250     20200   19.1600  146.6400       8.4        52       956        94
VIS    2025250     20200   19.1500  146.6200       8.6        55       965        92
VIS    2025250     20200   19.1500  146.5700       9.3        53       977        90
VIS    2025250     20200   19.1400  145.4300      10.9        47       982        94
VIS    2025250     20200   19.1500  145.4100      10.6        51       961        98
VIS    2025250     20200   19.1400  145.4000      10.6        48       939        96
VIS    2025250     20200   19.1500  145.3600      10.4        48       919        97
VIS    2025250     20200   19.1600  145.3400      10.5        50       907        97
VIS    2025250     20200   19.1500  145.3200      10.5        53       905        97
VIS    2025250     20200   19.1600  145.2900      10.5        54       904        98
VIS    2025250     20200   19.1400  145.2700       9.8        67       895        99
VIS    2025250     20200   19.1400  145.2400      10.7        87       851        93
VIS    2025250     20200   19.1400  145.2100      11.9        96       799        90
VIS    2025250     20200   19.1400  145.2000      11.9        98       799        91
VIS    2025250     20200   19.1500  145.1800      12.2        96       799        90
VIS    2025250     20200   19.1500  144.8600      11.3        52       915        98
VIS    2025250     20200   19.1500  144.8300      11.1        58       938        96
VIS    2025250     20200   19.1500  144.7900      11.0        54       883        92
VIS    2025250     20200   19.1500  144.7900      11.1        53       883        92
VIS    2025250     20200   19.1400  144.7400      11.0        60       897        99
VIS    2025250     20200   19.1500  144.7400      11.7        56       903        97
VIS    2025250     20200   19.1300  144.7100       9.0        64       913        93
VIS    2025250     20200   19.1300  144.6700       8.4        87       834        93
VIS    2025250     20200   19.1500  144.6600       8.2        88       819        93
VIS    2025250     20200   19.1300  144.6200       8.5        89       737        93
VIS    2025250     20200   19.1400  144.6100       9.0        91       732        92
VIS    2025250     20200   19.1300  144.1100      10.3        75       803        97
VIS    2025250     20200   19.1400  144.0800       9.6        89       834        91
VIS    2025250     20200   19.1400  144.0700       9.5        94       793        93
VIS    2025250     20200   19.1300  144.0400       9.4        81       753        90
VIS    2025250     20200   19.1300  144.0300       8.9        76       767        91
VIS    2025250     20200   19.1300  144.0000       8.7        70       790        94
VIS    2025250     20200   19.1500  143.9800       8.5        77       831        96
VIS    2025250     20200   19.1500  143.9400       9.1        86       845        93
VIS    2025250     20200   19.1400  143.9200      10.3        87       789        99
VIS    2025250     20200   19.1400  143.9000      10.7        88       786        99
VIS    2025250     20200   19.1500  143.8700      11.6        92       763        96
VIS    2025250     20200   19.1400  143.8400      11.6        93       773        95
VIS    2025250     20200   19.1300  143.8300      11.3        89       769        95
VIS    2025250     20200   19.1300  143.8100      11.1        83       742        91
VIS    2025250     20200   19.1400  143.7400      10.1        79       715        90
VIS    2025250     20200   19.1300  143.7200      10.8        85       712        93
VIS    2025250     20200   19.1300  143.7100      11.1        86       712        93
VIS    2025250     20200   19.1400  143.6700      11.9        89       709        93
VIS    2025250     20200   19.1300  143.6400      11.3        89       702        94
VIS    2025250     20200   19.1300  143.3700      11.0        85       762        94
VIS    2025250     20200   19.1300  140.7300      12.4       123       779        99
VIS    2025250     20200   19.1300  140.7300      12.8       123       793        99
VIS    2025250     20200   19.1300  140.6900      13.3       132       843        97
VIS    2025250     20200   19.1300  140.6700      13.3       128       843        98
VIS    2025250     20200   19.1200  140.6400      13.7       124       847       100
VIS    2025250     20200   19.1100  140.6300      14.3       121       851        99
VIS    2025250     20200   19.1100  140.6000      15.4       122       853        99
VIS    2025250     20200   19.1100  140.5600      13.6       119       856        99
VIS    2025250     20200   19.1300  140.5500      15.1       120       861        98
VIS    2025250     20200   19.1200  140.5400      14.7       120       861        99
VIS    2025250     20200   19.1100  140.5100      15.1       125       865        94
VIS    2025250     20200   19.1200  140.4700      14.6       133       861        96
VIS    2025250     20200   19.1100  140.4500      15.0       134       864        95
VIS    2025250     20200   19.1300  140.4400      14.4       132       861        97
VIS    2025250     20200   19.1200  140.4100      14.6       125       857        99
VIS    2025250     20200   19.1300  140.3900      14.6       125       860        99
VIS    2025250     20200   19.1300  140.3500      15.0       122       861        99
VIS    2025250     20200   19.1500  149.0600       5.6        70       951        90
VIS    2025250     20200   19.1600  149.0500       5.8        71       934        92
VIS    2025250     20200   19.1600  149.0300       5.1        63       920        95
VIS    2025250     20200   19.1500  149.0100       4.7        59       920        95
VIS    2025250     20200   19.1700  148.9700       5.7        62       949        96
VIS    2025250     20200   19.1700  148.9600       5.8        63       962        97
VIS    2025250     20200   19.1500  146.9500       9.5        47       968        95
VIS    2025250     20200   19.1500  146.9200       9.5        46       965        95
VIS    2025250     20200   19.1300  146.9000       9.8        42       963        96
VIS    2025250     20200   19.1400  146.7100       8.6        55       968        98
VIS    2025250     20200   19.1500  146.6400       8.4        49       956        97
VIS    2025250     20200   19.1400  146.5800       9.3        53       977        91
VIS    2025250     20200   19.1200  145.3700      10.5        49       935        99
VIS    2025250     20200   19.1300  145.3500      10.4        51       920        98
VIS    2025250     20200   19.1200  145.3200      10.3        56       907        97
VIS    2025250     20200   19.1200  145.2900      10.2        58       905        99
VIS    2025250     20200   19.1300  145.2400      11.1        89       818        91
VIS    2025250     20200   19.1300  145.2100      11.8        94       799        91
VIS    2025250     20200   19.1300  145.2000      11.6        93       799        92
VIS    2025250     20200   19.1200  145.1600       9.9        82       776        94
VIS    2025250     20200   19.1100  145.1300       8.0        83       795        99
VIS    2025250     20200   19.1300  144.9600       8.6        83       878        96
VIS    2025250     20200   19.1300  144.8800      11.3        51       874        91
VIS    2025250     20200   19.1100  144.8300      11.3        58       915        98
VIS    2025250     20200   19.1200  144.8100      11.3        57       883        92
VIS    2025250     20200   19.1200  144.7900      11.3        54       883        92
VIS    2025250     20200   19.1200  144.7700      10.5        60       876        94
VIS    2025250     20200   19.1200  144.7400      10.4        64       883        97
VIS    2025250     20200   19.1200  144.7300       9.8        65       902        96
VIS    2025250     20200   19.1300  144.6700       8.4        88       834        93
VIS    2025250     20200   19.1100  144.6500       8.4        90       742        91
VIS    2025250     20200   19.1300  144.6100       8.8        90       732        93
VIS    2025250     20200   19.1200  144.1100      10.4        74       803        97
VIS    2025250     20200   19.1100  144.0800       9.9        90       803        99
VIS    2025250     20200   19.1200  144.0700       9.7        93       767        98
VIS    2025250     20200   19.1200  144.0400       9.0        79       753        90
VIS    2025250     20200   19.1200  144.0100       8.6        71       790        94
VIS    2025250     20200   19.1100  143.9900       8.8        72       826        96
VIS    2025250     20200   19.1200  143.9500       9.7        81       826        98
VIS    2025250     20200   19.1100  143.9400      10.5        84       816        98
VIS    2025250     20200   19.1000  143.9100      11.7        87       763        93
VIS    2025250     20200   19.1200  143.8900      11.4        90       786        96
VIS    2025250     20200   19.1100  143.8600      11.5        89       787        95
VIS    2025250     20200   19.1000  143.8400      11.2        86       771        95
VIS    2025250     20200   19.1200  143.8100      11.1        83       742        92
VIS    2025250     20200   19.1200  143.8000      11.1        78       733        90
VIS    2025250     20200   19.1200  143.7300      10.6        81       714        90
VIS    2025250     20200   19.1000  143.7000      10.9        87       712        93
VIS    2025250     20200   19.1000  143.6800      11.0        89       714        95
VIS    2025250     20200   19.1200  143.6400      11.2        91       704        95
VIS    2025250     20200   19.1200  143.3700      11.6        81       775        93
VIS    2025250     20200   19.1000  143.2800      13.7        61       876        94
VIS    2025250     20200   19.0900  140.7000      13.5       127       826        99
VIS    2025250     20200   19.0900  140.6900      14.5       127       840        99
VIS    2025250     20200   19.1000  140.6700      14.7       128       845        99
VIS    2025250     20200   19.1100  140.6300      14.4       123       849        99
VIS    2025250     20200   19.1000  140.6300      14.4       124       849       100
VIS    2025250     20200   19.1000  140.5900      14.1       121       855        98
VIS    2025250     20200   19.1000  140.5600      12.8       118       856        99
VIS    2025250     20200   19.1000  140.5400      14.0       121       860       100
VIS    2025250     20200   19.1000  140.5100      15.2       125       863        94
VIS    2025250     20200   19.0900  140.4900      14.9       130       866        93
VIS    2025250     20200   19.0800  140.4700      15.0       131       864        96
VIS    2025250     20200   19.0900  140.4600      14.9       133       864        95
VIS    2025250     20200   19.1000  140.4300      15.2       127       859        97
VIS    2025250     20200   19.0900  140.4000      14.0       120       859        97
VIS    2025250     20200   19.0900  140.3700      13.9       124       863        98
VIS    2025250     20200   19.1300  149.2000       6.0        66       974        91
VIS    2025250     20200   19.1400  149.1900       6.3        63       936        95
VIS    2025250     20200   19.1300  149.0400       5.0        69       934        90
VIS    2025250     20200   19.1300  149.0200       4.7        69       926        95
VIS    2025250     20200   19.1300  148.9600       4.2        65       969        90
VIS    2025250     20200   19.1200  146.8900       9.7        42       963        96
VIS    2025250     20200   19.1100  146.8700       9.7        41       943        95
VIS    2025250     20200   19.1000  146.8300       9.6        40       933        92
VIS    2025250     20200   19.1200  146.7100       8.5        55       968        98
VIS    2025250     20200   19.1200  146.6100       8.2        48       956        91
VIS    2025250     20200   19.1100  145.3400      10.0        56       935       100
VIS    2025250     20200   19.1000  145.2900       9.9        58       927        95
VIS    2025250     20200   19.1000  145.2900      10.0        60       913        97
VIS    2025250     20200   19.0900  145.2600       9.9        82       833        95
VIS    2025250     20200   19.1000  145.2400      10.6        82       786        93
VIS    2025250     20200   19.1000  145.2100      10.2        78       746        95
VIS    2025250     20200   19.0900  145.1800       9.2        96       740        98
VIS    2025250     20200   19.1000  145.1500       8.7        81       772        99
VIS    2025250     20200   19.0900  145.1400       8.0        83       772        97
VIS    2025250     20200   19.0900  144.9700       8.5        78       829        96
VIS    2025250     20200   19.0900  144.8900      11.2        52       868        91
VIS    2025250     20200   19.1000  144.8700      11.2        53       921        99
VIS    2025250     20200   19.1000  144.8300      11.2        59       913        98
VIS    2025250     20200   19.0900  144.8000      11.6        56       873        92
VIS    2025250     20200   19.0900  144.7900      11.7        54       871        91
VIS    2025250     20200   19.0800  144.6300       9.2        96       717        90
VIS    2025250     20200   19.0900  144.0900       9.6        82       803        95
VIS    2025250     20200   19.0900  144.0700       9.3        88       748        94
VIS    2025250     20200   19.0900  144.0600       9.0        82       748        92
VIS    2025250     20200   19.0800  144.0400       8.9        76       748        90
VIS    2025250     20200   19.0800  144.0200       9.0        73       816        95
VIS    2025250     20200   19.0800  143.9500      10.5        87       812        98
VIS    2025250     20200   19.0900  143.9200      11.4        87       788        96
VIS    2025250     20200   19.0800  143.8500      11.5        87       748        91
VIS    2025250     20200   19.1000  143.8400      11.3        86       761        94
VIS    2025250     20200   19.1000  143.8100      11.5        82       727        91
VIS    2025250     20200   19.0800  143.7600      11.7        80       725        90
VIS    2025250     20200   19.0900  143.7100      11.0        87       714        92
VIS    2025250     20200   19.0900  143.6900      10.9        86       714        92
VIS    2025250     20200   19.0800  143.6700      11.3        83       725        90
VIS    2025250     20200   19.1000  143.6500      11.2        86       727        93
VIS    2025250     20200   19.0900  143.3300      14.1        79       794        91
VIS    2025250     20200   19.0900  143.2900      12.7        62       879        94
VIS    2025250     20200   19.0900  143.2900      13.3        61       878        94
VIS    2025250     20200   19.0700  143.1700      15.5        75       883        90
VIS    2025250     20200   19.0700  141.0500      15.2       117       706        91
VIS    2025250     20200   19.0800  140.6900      13.5       127       826       100
VIS    2025250     20200   19.0800  140.6600      13.9       126       826       100
VIS    2025250     20200   19.0700  140.6400      13.0       125       823        99
VIS    2025250     20200   19.0600  140.6100      11.0       127       790        95
VIS    2025250     20200   19.0600  140.5900      11.0       124       826        97
VIS    2025250     20200   19.0800  140.5700      11.9       118       855        97
VIS    2025250     20200   19.0800  140.5300      14.0       121       853       100
VIS    2025250     20200   19.0600  140.5100      14.3       125       856        98
VIS    2025250     20200   19.0700  140.4900      14.8       130       860        95
VIS    2025250     20200   19.0800  140.4700      15.2       131       864        96
VIS    2025250     20200   19.0700  140.4300      15.5       125       861        97
VIS    2025250     20200   19.0700  140.4100      15.3       117       860        96
VIS    2025250     20200   19.0700  140.4000      15.1       116       863        97
VIS    2025250     20200   19.0700  140.3800      14.7       120       864        96
VIS    2025250     20200   19.1000  149.0700       5.2        69       981        92
VIS    2025250     20200   19.1100  149.0400       4.7        71       944        91
VIS    2025250     20200   19.1200  149.0200       4.5        69       929        94
VIS    2025250     20200   19.1200  148.9600       4.2        66       976        91
VIS    2025250     20200   19.1200  148.9300       5.0        60       971        93
VIS    2025250     20200   19.1000  146.9100       9.4        45       948        98
VIS    2025250     20200   19.1000  146.8800       9.6        42       948        97
VIS    2025250     20200   19.1000  146.8500       9.9        40       933        94
VIS    2025250     20200   19.0900  146.8400       9.7        39       933        95
VIS    2025250     20200   19.0800  146.8200       9.3        41       930        96
VIS    2025250     20200   19.0900  146.6900       8.8        50       962       100
VIS    2025250     20200   19.0700  145.3500       9.7        66       975        94
VIS    2025250     20200   19.0800  145.3200       9.4        64       964        96
VIS    2025250     20200   19.0800  145.1900       8.6        96       734        96
VIS    2025250     20200   19.0700  145.1400       8.3        91       772        91
VIS    2025250     20200   19.0600  144.9000      11.0        54       882        93
VIS    2025250     20200   19.0800  144.8500      11.1        56       910        99
VIS    2025250     20200   19.0800  144.8400      11.3        60       895        98
VIS    2025250     20200   19.0600  144.8200      11.3        61       888        98
VIS    2025250     20200   19.0700  144.7800      11.2        56       864        90
VIS    2025250     20200   19.0600  144.7100       8.7        89       788        96
VIS    2025250     20200   19.0600  144.7000       8.7        92       787        97
VIS    2025250     20200   19.0600  144.6600       9.1        94       741        92
VIS    2025250     20200   19.0800  144.6300       9.3        96       717        91
VIS    2025250     20200   19.0700  144.1800       9.6        97       703        97
VIS    2025250     20200   19.0700  144.0800       9.2        84       800        92
VIS    2025250     20200   19.0700  144.0500       9.1        81       748        90
VIS    2025250     20200   19.0700  144.0400       9.1        80       748        90
VIS    2025250     20200   19.0600  144.0000       9.5        75       872        91
VIS    2025250     20200   19.0500  143.9900      10.1        74       837        97
VIS    2025250     20200   19.0600  143.9600      10.2        83       811       100
VIS    2025250     20200   19.0700  143.9400      10.6        87       824        98
VIS    2025250     20200   19.0600  143.9000      11.1        83       762        91
VIS    2025250     20200   19.0500  143.8800      11.3        85       735        92
VIS    2025250     20200   19.0700  143.8600      11.6        86       746        90
VIS    2025250     20200   19.0500  143.8400      11.5        88       731        93
VIS    2025250     20200   19.0600  143.8200      11.5        86       731        92
VIS    2025250     20200   19.0600  143.7800      11.6        84       725        92
VIS    2025250     20200   19.0600  143.7700      11.5        83       726        91
VIS    2025250     20200   19.0600  143.7500      11.2        83       725        91
VIS    2025250     20200   19.0500  143.7200      11.2        82       722        92
VIS    2025250     20200   19.0700  143.7000      11.2        82       722        92
VIS    2025250     20200   19.0600  143.3000      13.4        67       881        95
VIS    2025250     20200   19.0500  143.2800      14.3        77       883        99
VIS    2025250     20200   19.0500  143.2500      16.7        82       889        98
VIS    2025250     20200   19.0500  143.2300      16.1        82       890        98
VIS    2025250     20200   19.0600  143.2100      15.7        81       881        96
VIS    2025250     20200   19.0600  143.1700      15.9        77       883        92
VIS    2025250     20200   19.0700  143.1600      15.7        76       883        90
VIS    2025250     20200   19.0500  141.2800      14.3       117       749        92
VIS    2025250     20200   19.0400  141.2600      15.8       119       751        90
VIS    2025250     20200   19.0500  141.1700      15.0       117       746        93
VIS    2025250     20200   19.0500  141.1500      15.4       116       746        92
VIS    2025250     20200   19.0600  140.6400      10.6       121       769        93
VIS    2025250     20200   19.0600  140.5600      12.4       124       843        99
VIS    2025250     20200   19.0500  140.4700      14.8       127       857        99
VIS    2025250     20200   19.0500  140.4500      15.4       123       859        99
VIS    2025250     20200   19.0400  140.4300      14.5       117       861        98
VIS    2025250     20200   19.0400  140.4000      13.4       114       863        98
VIS    2025250     20200   19.0400  140.3700      15.1       126       867        98
VIS    2025250     20200   19.0900  149.2200       6.5        74       971        97
VIS    2025250     20200   19.1000  149.0800       5.5        67       981        93
VIS    2025250     20200   19.1000  149.0700       5.2        67       981        90
VIS    2025250     20200   19.0500  146.8900       9.7        44       971        91
VIS    2025250     20200   19.0700  146.8500       9.6        40       936        96
VIS    2025250     20200   19.0700  146.8400       9.6        40       936        96
VIS    2025250     20200   19.0500  146.7500       9.6        45       971        95
VIS    2025250     20200   19.0500  146.7400       9.6        45       984        95
VIS    2025250     20200   19.0700  146.6700       9.4        48       964        99
VIS    2025250     20200   19.0400  145.2300      10.9        84       738        94
VIS    2025250     20200   19.0500  145.1400       9.0        90       772        93
VIS    2025250     20200   19.0600  145.1100       9.3        88       824        92
VIS    2025250     20200   19.0500  144.9200      10.9        53       868        90
VIS    2025250     20200   19.0500  144.9100      10.9        53       876        91
VIS    2025250     20200   19.0400  144.8900      10.7        54       892        91
VIS    2025250     20200   19.0600  144.8600      11.2        56       895        95
VIS    2025250     20200   19.0600  144.8300      11.3        60       888        97
VIS    2025250     20200   19.0300  144.7000       8.1        92       734        98
VIS    2025250     20200   19.0500  144.6900       8.8        94       738        98
VIS    2025250     20200   19.0400  144.3100       8.4        94       703        93
VIS    2025250     20200   19.0300  144.1600       9.5        85       745        92
VIS    2025250     20200   19.0400  144.1600       9.5        86       780        95
VIS    2025250     20200   19.0300  144.1100       9.2        80       822        94
VIS    2025250     20200   19.0400  144.0700       9.7        93       811        96
VIS    2025250     20200   19.0500  144.0600       9.5        92       800        96
VIS    2025250     20200   19.0300  144.0200       9.8        78       872        96
VIS    2025250     20200   19.0500  143.9800      10.5        77       834        94
VIS    2025250     20200   19.0500  143.9600      10.4        82       831        98
VIS    2025250     20200   19.0300  143.9200      10.1        80       825        97
VIS    2025250     20200   19.0300  143.9000      10.4        77       763        92
VIS    2025250     20200   19.0400  143.8900      10.6        78       750        90
VIS    2025250     20200   19.0300  143.8700      11.0        83       736        92
VIS    2025250     20200   19.0500  143.8400      11.6        88       731        93
VIS    2025250     20200   19.0400  143.8100      11.6        84       729        90
VIS    2025250     20200   19.0300  143.7900      12.0        83       727        90
VIS    2025250     20200   19.0300  143.7600      11.4        83       727        91
VIS    2025250     20200   19.0400  143.7300      10.9        83       719        93
VIS    2025250     20200   19.0300  143.7200      11.0        82       719        92
VIS    2025250     20200   19.0300  143.7000      11.2        80       719        91
VIS    2025250     20200   19.0200  143.3600      14.0        66       873        94
VIS    2025250     20200   19.0200  143.3600      13.8        65       879        95
VIS    2025250     20200   19.0400  143.3100      11.7        68       883        93
VIS    2025250     20200   19.0300  143.2900      14.7        78       889        99
VIS    2025250     20200   19.0400  143.2800      14.5        77       887        99
VIS    2025250     20200   19.0300  143.2400      15.4        84       889        97
VIS    2025250     20200   19.0400  143.2300      16.3        83       889        97
VIS    2025250     20200   19.0300  143.2000      16.9        87       879        98
VIS    2025250     20200   19.0200  143.1800      16.2        82       873        98
VIS    2025250     20200   19.0200  143.1600      16.5        76       873        96
VIS    2025250     20200   19.0300  141.2600      15.7       119       751        90
VIS    2025250     20200   19.0300  141.1600      15.1       114       740        96
VIS    2025250     20200   19.0300  141.1500      15.2       114       740        96
VIS    2025250     20200   19.0300  141.1300      16.2       117       716        91
VIS    2025250     20200   19.0300  140.4400      14.1       116       855        99
VIS    2025250     20200   19.0300  140.4100      12.3       115       861        98
VIS    2025250     20200   19.0200  140.3900      12.1       115       857        95
VIS    2025250     20200   19.0200  140.3600      15.2       131       864        97
VIS    2025250     20200   19.0700  149.2100       6.0        72       969        95
VIS    2025250     20200   19.0300  146.9400      10.2        46       983        91
VIS    2025250     20200   19.0400  146.9200      10.1        46       975        93
VIS    2025250     20200   19.0400  146.9100      10.2        47       967        92
VIS    2025250     20200   19.0300  146.8700       9.6        45       967        96
VIS    2025250     20200   19.0300  146.7400       9.6        42       964        97
VIS    2025250     20200   19.0300  146.7400       9.5        42       964        99
VIS    2025250     20200   19.0400  146.7100       9.6        37       971        95
VIS    2025250     20200   19.0500  146.6800       9.8        46       962        98
VIS    2025250     20200   19.0200  145.8300      10.6        44       982        99
VIS    2025250     20200   19.0200  145.8300      10.6        44       982        99
VIS    2025250     20200   19.0200  145.2600      10.6       102       756        90
VIS    2025250     20200   19.0300  145.2300      10.9        86       746        94
VIS    2025250     20200   19.0100  145.2300      11.0        87       765        93
VIS    2025250     20200   19.0200  145.1500       8.6        76       736        94
VIS    2025250     20200   19.0300  145.1300       9.8        77       809        97
VIS    2025250     20200   19.0100  145.0100      10.6        53       934        98
VIS    2025250     20200   19.0100  145.0100      10.9        50       934        93
VIS    2025250     20200   19.0100  144.9100      11.8        49       876        90
VIS    2025250     20200   19.0100  144.8900      11.2        50       879        92
VIS    2025250     20200   19.0100  144.8900      11.0        50       879        92
VIS    2025250     20200   19.0100  144.8600      11.5        52       876        90
VIS    2025250     20200   19.0200  144.8400      11.8        53       874        90
VIS    2025250     20200   19.0100  144.7200       8.3        86       728        95
VIS    2025250     20200   19.0300  144.7100       8.0        90       730        97
VIS    2025250     20200   19.0200  144.3600       9.2       100       714       100
VIS    2025250     20200   19.0200  144.3400       9.3        99       719        99
VIS    2025250     20200   19.0100  144.3100       9.3        98       714        93
VIS    2025250     20200   19.0100  144.1300       9.4        72       794        94
VIS    2025250     20200   19.0300  144.1100       9.2        80       822        95
VIS    2025250     20200   19.0100  144.0900      10.3        86       858        90
VIS    2025250     20200   19.0200  144.0800       9.7        94       850        94
VIS    2025250     20200   19.0000  144.0400       9.9        74       883        97
VIS    2025250     20200   19.0200  144.0200       9.8        78       872        97
VIS    2025250     20200   19.0200  144.0100      10.0        79       864        93
VIS    2025250     20200   19.0200  143.9700      11.3        81       844        97
VIS    2025250     20200   19.0100  143.9400      10.6        78       825        98
VIS    2025250     20200   19.0100  143.9200      10.3        78       800        96
VIS    2025250     20200   19.0200  143.8900      10.5        77       750        90
VIS    2025250     20200   19.0200  143.8800      10.7        79       744        90
VIS    2025250     20200   19.0100  143.8400      11.2        83       731        91
VIS    2025250     20200   19.0100  143.8200      11.6        84       728        91
VIS    2025250     20200   19.0100  143.8100      12.1        85       727        90
VIS    2025250     20200   19.0200  143.7800      12.0        83       729        90
VIS    2025250     20200   19.0200  143.7200      11.0        81       717        92
VIS    2025250     20200   19.0200  143.7100      11.1        80       717        91
VIS    2025250     20200   19.0200  143.6900      11.2        79       715        90
VIS    2025250     20200   19.0200  143.3700      14.4        69       871        92
VIS    2025250     20200   19.0000  143.2800      16.0        81       881        97
VIS    2025250     20200   19.0000  143.2800      16.1        81       881        96
VIS    2025250     20200   19.0000  143.2300      15.5        93       872        96
VIS    2025250     20200   19.0000  143.2200      15.7        94       870        95
VIS    2025250     20200   19.0000  143.2000      16.4        85       872        96
VIS    2025250     20200   19.0000  140.3900      10.6       118       799        92
VIS    2025250     20200   19.0000  140.3500      14.1       134       841        98
VIS    2025250     20200   19.0500  149.4700       6.8        77       983        96
VIS    2025250     20200   19.0300  149.2200       6.2        65       964        91
VIS    2025250     20200   19.0200  146.9400      10.2        46       983        91
VIS    2025250     20200   19.0200  146.9300       9.9        46       975        94
VIS    2025250     20200   19.0200  146.8200       9.4        44       970        98
VIS    2025250     20200   19.0200  146.7900       9.7        43       964        90
VIS    2025250     20200   19.0200  146.7500       9.6        42       964        98
VIS    2025250     20200   19.0200  146.7400       9.5        42       964        98
VIS    2025250     20200   19.0100  146.7000      10.0        39       950        95
VIS    2025250     20200   19.0000  146.1100      10.2        54       973        92
VIS    2025250     20200   19.0100  145.2300      11.0        91       765        94
VIS    2025250     20200   19.0000  145.1300       9.3        72       778        92
VIS    2025250     20200   19.0100  145.1100       9.5        71       796        94
VIS    2025250     20200   19.0000  145.0100      10.7        51       924        98
VIS    2025250     20200   19.0000  145.0000      10.9        50       906        94
VIS    2025250     20200   19.0000  144.8800      11.2        50       876        91
VIS    2025250     20200   19.0000  144.8800      11.2        49       870        90
VIS    2025250     20200   18.9900  144.8500      11.4        50       867        90
VIS    2025250     20200   19.0000  144.7500       9.4        80       760        91
VIS    2025250     20200   18.9900  144.7200       9.1        89       700        95
VIS    2025250     20200   18.9800  144.3500       9.3        97       721        97
VIS    2025250     20200   18.9900  144.3300       9.9        99       720        94
VIS    2025250     20200   18.9800  144.3000       9.9        99       713        93
VIS    2025250     20200   19.0000  144.1000       9.6        75       859        92
VIS    2025250     20200   18.9800  144.0700      10.3        73       892        91
VIS    2025250     20200   18.9800  144.0400      10.0        73       872        98
VIS    2025250     20200   19.0000  144.0100      10.7        79       845        99
VIS    2025250     20200   18.9800  143.9900      11.1        79       831       100
VIS    2025250     20200   18.9900  143.9700      11.2        80       844        99
VIS    2025250     20200   18.9800  143.9300      10.4        76       803        97
VIS    2025250     20200   18.9900  143.9200      10.5        77       763        91
VIS    2025250     20200   18.9800  143.8200      11.9        82       731        90
VIS    2025250     20200   18.9800  143.8000      12.2        86       731        91
VIS    2025250     20200   19.0000  143.7100      11.3        80       710        91
VIS    2025250     20200   18.9800  143.4400      13.7        73       855        91
VIS    2025250     20200   18.9900  143.4200      13.9        71       887        98
VIS    2025250     20200   19.0000  143.3800      13.8        71       876        90
VIS    2025250     20200   18.9800  143.3500      11.3        59       879        90
VIS    2025250     20200   18.9800  143.3100      14.2        72       878        96
VIS    2025250     20200   18.9900  143.2800      16.4        80       873        95
VIS    2025250     20200   18.9900  143.2700      16.6        80       870        94
VIS    2025250     20200   18.9900  143.2100      16.4        86       868        98
VIS    2025250     20200   19.0100  149.5200       6.8        57       970        95
VIS    2025250     20200   19.0200  149.5100       6.7        59       970        96
VIS    2025250     20200   19.0100  149.4700       6.2        64       960        97
VIS    2025250     20200   19.0100  149.4600       6.3        64       951        97
VIS    2025250     20200   19.0100  149.4300       6.4        72       910        96
VIS    2025250     20200   19.0100  149.2300       6.2        63       964        96
VIS    2025250     20200   19.0100  149.2100       5.6        66       943        97
VIS    2025250     20200   19.0000  149.0700       6.5        80       960        91
VIS    2025250     20200   19.0000  146.8900       9.6        44       967        97
VIS    2025250     20200   18.9800  146.7900       9.9        41       971        96
VIS    2025250     20200   19.0000  146.7500       9.4        41       946        97
VIS    2025250     20200   18.9800  146.6400       9.4        52       984        91
VIS    2025250     20200   18.9800  146.5500      10.6        45       971        98
VIS    2025250     20200   18.9900  146.1600      10.4        55       986        95
VIS    2025250     20200   18.9700  146.1500      10.3        51       964        97
VIS    2025250     20200   18.9900  146.1300      10.2        55       973        95
VIS    2025250     20200   18.9700  145.2700       9.4        96       734        96
VIS    2025250     20200   18.9800  145.2600       9.8        98       744        92
VIS    2025250     20200   18.9600  145.2200      10.1        92       777        94
VIS    2025250     20200   18.9600  145.2100      10.5        89       777        94
VIS    2025250     20200   18.9700  145.1800      11.1        91       751        90
VIS    2025250     20200   18.9800  145.0200       9.5        69       928        91
VIS    2025250     20200   18.9700  145.0000      10.7        54       886        94
VIS    2025250     20200   18.9600  144.9800      11.3        50       906        94
VIS    2025250     20200   18.9600  144.7400       9.0        84       705        96
VIS    2025250     20200   18.9800  144.7200       9.4        88       700        95
VIS    2025250     20200   18.9700  144.3100       9.9        98       713        93
VIS    2025250     20200   18.9700  144.3000      10.0       100       713        95
VIS    2025250     20200   18.9600  144.2700       9.7       100       702        96
VIS    2025250     20200   18.9800  144.0700      10.2        71       885        91
VIS    2025250     20200   18.9800  144.0400      10.0        74       861        97
VIS    2025250     20200   18.9700  144.0300       9.8        77       836        98
VIS    2025250     20200   18.9700  144.0100      10.7        78       831        99
VIS    2025250     20200   18.9500  143.9800      10.3        79       814        93
VIS    2025250     20200   18.9500  143.9500      10.2        81       805        97
VIS    2025250     20200   18.9600  143.9300      10.6        82       763        93
VIS    2025250     20200   18.9700  143.9100      11.0        82       744        91
VIS    2025250     20200   18.9700  143.8200      11.8        82       731        90
VIS    2025250     20200   18.9600  143.7200      11.3        79       716        90
VIS    2025250     20200   18.9500  143.3600      10.2        68       874        95
VIS    2025250     20200   18.9700  143.3400      11.3        57       879        91
VIS    2025250     20200   18.9500  143.3200      13.4        62       873        94
VIS    2025250     20200   18.9700  143.3100      14.3        71       876        96
VIS    2025250     20200   18.9900  149.5400       7.2        63       989        97
VIS    2025250     20200   18.9900  149.5400       7.0        62       989        97
VIS    2025250     20200   18.9900  149.5100       6.5        62       970        97
VIS    2025250     20200   18.9800  149.4700       6.3        67       953        99
VIS    2025250     20200   18.9800  149.4600       6.3        70       910        98
VIS    2025250     20200   19.0000  149.4300       6.2        72       910        95
VIS    2025250     20200   18.9800  149.2300       5.9        61       948        96
VIS    2025250     20200   18.9800  149.0600       6.6        69       953        93
VIS    2025250     20200   18.9900  149.0300       5.5        65       915        94
VIS    2025250     20200   19.0000  148.8500       6.1        35       986        92
VIS    2025250     20200   18.9500  146.5700       9.9        46       960        99
VIS    2025250     20200   18.9600  146.5500      10.4        45       971        99
VIS    2025250     20200   18.9500  146.1700      10.5        50       962        99
VIS    2025250     20200   18.9600  146.1500      10.3        49       937        97
VIS    2025250     20200   18.9600  146.1400      10.0        48       918        96
VIS    2025250     20200   18.9500  146.0900       8.0        40       950        94
VIS    2025250     20200   18.9600  145.3100      10.3        89       783        90
VIS    2025250     20200   18.9600  145.2800       9.3        86       744        94
VIS    2025250     20200   18.9600  145.2500       9.4        93       762        93
VIS    2025250     20200   18.9600  145.2200       9.8        90       777        95
VIS    2025250     20200   18.9600  145.2100      10.0        88       777        95
VIS    2025250     20200   18.9400  145.1900       9.7        90       765        95
VIS    2025250     20200   18.9600  145.1300      10.2        86       806        95
VIS    2025250     20200   18.9500  145.0000      10.5        55       924        96
VIS    2025250     20200   18.9600  144.9700      11.4        50       906        92
VIS    2025250     20200   18.9400  144.9500      11.2        51       895        90
VIS    2025250     20200   18.9500  144.9400      11.0        52       895        93
VIS    2025250     20200   18.9400  144.3200       9.5        95       713        92
VIS    2025250     20200   18.9300  144.3000       9.6        99       713        90
VIS    2025250     20200   18.9500  144.2800       9.9       101       712        96
VIS    2025250     20200   18.9400  144.2600       9.5        98       712        98
VIS    2025250     20200   18.9400  144.2400       8.8        88       712        96
VIS    2025250     20200   18.9300  144.1300      10.4        77       808        97
VIS    2025250     20200   18.9500  144.1000      10.8        58       885        93
VIS    2025250     20200   18.9300  144.0800      10.8        57       885        93
VIS    2025250     20200   18.9300  144.0700      10.4        63       841        92
VIS    2025250     20200   18.9500  144.0400      10.2        78       836        97
VIS    2025250     20200   18.9300  144.0000      10.4        82       823        98
VIS    2025250     20200   18.9400  143.9900      10.6        80       809        95
VIS    2025250     20200   18.9300  143.9500      11.0        87       798        99
VIS    2025250     20200   18.9300  143.9400      11.0        87       763        96
VIS    2025250     20200   18.9300  143.9200      11.7        89       744        93
VIS    2025250     20200   18.9500  143.7200      11.3        81       716        91
VIS    2025250     20200   18.9800  149.5600       7.6        65       989        97
VIS    2025250     20200   18.9800  149.5300       6.8        65       985        99
VIS    2025250     20200   18.9800  149.4800       6.4        62       960        98
VIS    2025250     20200   18.9800  149.4600       6.3        70       923        98
VIS    2025250     20200   18.9800  149.4500       6.0        76       910        93
VIS    2025250     20200   18.9800  149.2300       5.8        61       948        97
VIS    2025250     20200   18.9500  148.7900       7.3        73       960        94
VIS    2025250     20200   18.9500  148.7900       7.1        72       960        96
VIS    2025250     20200   18.9400  146.6100      10.4        44       960        91
VIS    2025250     20200   18.9300  146.5900      10.1        44       960        96
VIS    2025250     20200   18.9500  146.5800      10.0        46       956        99
VIS    2025250     20200   18.9400  146.1500      10.3        49       918        97
VIS    2025250     20200   18.9200  146.1400      10.0        50       918        98
VIS    2025250     20200   18.9400  146.1100       9.0        40       918        91
VIS    2025250     20200   18.9400  146.0800       8.4        40       950        95
VIS    2025250     20200   18.9300  145.2700       9.4        79       765        93
VIS    2025250     20200   18.9300  145.2600       9.5        80       778        94
VIS    2025250     20200   18.9300  145.2400       9.3        83       808        98
VIS    2025250     20200   18.9300  145.2200       9.5        85       778        98
VIS    2025250     20200   18.9200  145.1800      10.1        87       770        95
VIS    2025250     20200   18.9300  145.0300       8.8        79       940        90
VIS    2025250     20200   18.9300  145.0100       9.9        58       934        92
VIS    2025250     20200   18.9100  144.9800      11.4        48       923        90
VIS    2025250     20200   18.9300  144.9600      11.4        49       895        91
VIS    2025250     20200   18.9300  144.9300      10.8        50       886        91
VIS    2025250     20200   18.9200  144.9100      10.9        52       864        90
VIS    2025250     20200   18.9100  144.3100       9.3        96       713        92
VIS    2025250     20200   18.9100  144.2800       9.8        99       722        97
VIS    2025250     20200   18.9100  144.2700       9.6        97       723        98
VIS    2025250     20200   18.9200  144.2400       9.0        90       730        98
VIS    2025250     20200   18.9100  144.2000       9.9        79       764        91
VIS    2025250     20200   18.9300  144.1200      10.5        75       808        96
VIS    2025250     20200   18.9300  144.1200      10.6        71       808        95
VIS    2025250     20200   18.9300  144.0900      11.0        56       841        91
VIS    2025250     20200   18.9300  144.0600      10.3        67       831        93
VIS    2025250     20200   18.9100  144.0300      11.2        81       831        99
VIS    2025250     20200   18.9300  144.0000      10.5        81       823        99
VIS    2025250     20200   18.9100  143.9900      10.9        75       809        97
VIS    2025250     20200   18.9200  143.9500      11.2        89       767        96
VIS    2025250     20200   18.9200  143.9500      11.2        89       767        96
VIS    2025250     20200   18.9200  143.9200      11.8        89       741        93
VIS    2025250     20200   18.9200  143.7400      11.6        80       714        90
VIS    2025250     20200   18.9200  143.7300      11.7        82       711        91
VIS    2025250     20200   18.9500  149.4800       6.8        60       963        98
VIS    2025250     20200   18.9500  149.4600       6.5        64       953        99
VIS    2025250     20200   18.9500  149.2200       6.3        63       957        95
VIS    2025250     20200   18.9400  148.7900       7.0        70       965        94
VIS    2025250     20200   18.9200  146.6000      10.3        43       960        93
VIS    2025250     20200   18.9100  146.5700      10.0        45       934        96
VIS    2025250     20200   18.9000  146.5500      10.0        46       934        96
VIS    2025250     20200   18.9200  146.1600      10.0        51       961        99
VIS    2025250     20200   18.9100  146.1400       9.9        51       924        99
VIS    2025250     20200   18.9200  146.1100       9.5        43       917        96
VIS    2025250     20200   18.8900  145.3300       9.4        88       793        90
VIS    2025250     20200   18.9000  145.3100       9.3        82       773        91
VIS    2025250     20200   18.8900  145.2800       9.1        81       756        97
VIS    2025250     20200   18.9000  145.2600       9.5        84       765        95
VIS    2025250     20200   18.8900  145.2400       9.6        89       794        96
VIS    2025250     20200   18.9100  145.2200      10.0        86       790        97
VIS    2025250     20200   18.9000  145.1700       9.6        87       780        96
VIS    2025250     20200   18.8900  145.0200      11.7        48       926        95
VIS    2025250     20200   18.8900  145.0000      11.6        48       926        92
VIS    2025250     20200   18.9000  144.9800      11.5        48       926        92
VIS    2025250     20200   18.9000  144.9500      11.7        48       895        93
VIS    2025250     20200   18.8900  144.9400      11.8        50       888        92
VIS    2025250     20200   18.9000  144.9100      11.1        53       862        90
VIS    2025250     20200   18.8900  144.3200       9.3        95       712        95
VIS    2025250     20200   18.8900  144.3000       9.5        95       715        95
VIS    2025250     20200   18.8800  144.2700       9.7        89       734        98
VIS    2025250     20200   18.9000  144.2500       9.1        87       745        98
VIS    2025250     20200   18.8800  144.2200       8.9        81       806        98
VIS    2025250     20200   18.9000  144.1900       9.9        80       811        96
VIS    2025250     20200   18.8900  144.1700      10.0        79       839        98
VIS    2025250     20200   18.9000  144.1600       9.9        80       839        97
VIS    2025250     20200   18.8800  144.1200      11.1        80       743        90
VIS    2025250     20200   18.8800  144.1100      11.1        80       743        90
VIS    2025250     20200   18.8800  144.0500      12.0        76       786        92
VIS    2025250     20200   18.8800  144.0400      12.1        76       795        93
VIS    2025250     20200   18.8800  144.0000      11.0        69       820        95
VIS    2025250     20200   18.8900  143.9900      11.0        71       809        95
VIS    2025250     20200   18.9000  143.9500      11.5        93       744        94
VIS    2025250     20200   18.9000  143.9400      11.7        94       744        94
VIS    2025250     20200   18.8800  143.8000      11.3        81       727        90
VIS    2025250     20200   18.9300  149.2100       6.3        65       982        90
VIS    2025250     20200   18.9100  149.1700       6.0        67       974        93
VIS    2025250     20200   18.9100  149.0900       5.2        63       994        92
VIS    2025250     20200   18.9100  149.0200       6.0        73       940        95
VIS    2025250     20200   18.9100  149.0100       5.5        68       940        96
VIS    2025250     20200   18.8900  146.5900      10.3        42       960        95
VIS    2025250     20200   18.8800  146.5700      10.2        43       932        95
VIS    2025250     20200   18.8800  146.5600      10.2        44       931        95
VIS    2025250     20200   18.8900  146.5300      10.1        46       947        93
VIS    2025250     20200   18.8800  146.4900       9.9        45       970        91
VIS    2025250     20200   18.9000  146.4600      10.0        44       986        95
VIS    2025250     20200   18.9000  146.4600       9.9        44       986        97
VIS    2025250     20200   18.8800  146.4300       9.3        47       983        94
VIS    2025250     20200   18.8800  146.1500       9.8        50       964        98
VIS    2025250     20200   18.8800  146.1400       9.6        47       944        99
VIS    2025250     20200   18.8900  146.1300       9.6        46       924        97
VIS    2025250     20200   18.8900  145.3400       9.5        90       793        90
VIS    2025250     20200   18.8900  145.3100       9.2        81       769        96
VIS    2025250     20200   18.8700  145.2800       9.4        84       741        97
VIS    2025250     20200   18.8900  145.2500       9.5        89       769        94
VIS    2025250     20200   18.8700  145.2300      10.0        89       770        96
VIS    2025250     20200   18.8700  145.0200      11.7        47       926        97
VIS    2025250     20200   18.8800  144.9900      11.7        47       926        96
VIS    2025250     20200   18.8700  144.9700      11.9        47       927        97
VIS    2025250     20200   18.8700  144.9600      12.0        48       927        97
VIS    2025250     20200   18.8700  144.9300      12.1        50       888        92
VIS    2025250     20200   18.8600  144.3100       9.3        90       711        97
VIS    2025250     20200   18.8800  144.2900       9.8        92       722        98
VIS    2025250     20200   18.8800  144.2800       9.8        89       730        97
VIS    2025250     20200   18.8700  144.2300       9.3        77       790        95
VIS    2025250     20200   18.8700  144.2300       9.0        78       795        95
VIS    2025250     20200   18.8600  144.2000       9.5        83       795        95
VIS    2025250     20200   18.8800  144.1600      10.3        81       839        98
VIS    2025250     20200   18.8600  144.1400      11.2        78       745        90
VIS    2025250     20200   18.8700  144.1200      11.3        79       740        90
VIS    2025250     20200   18.8600  144.0900      10.9        82       740        91
VIS    2025250     20200   18.8700  144.0100      11.4        75       799        93
VIS    2025250     20200   18.8700  144.0100      10.9        72       816        94
VIS    2025250     20200   18.8600  143.8000      11.4        83       724        91
VIS    2025250     20200   18.8700  143.7800      11.4        84       717        91
VIS    2025250     20200   18.8900  149.2100       7.3        77       991        91
VIS    2025250     20200   18.9000  149.1800       6.4        69       979        95
VIS    2025250     20200   18.9000  149.1600       6.0        67       974        94
VIS    2025250     20200   18.9000  149.0200       5.6        68       970        91
VIS    2025250     20200   18.8800  148.8700       7.2        82       993        95
VIS    2025250     20200   18.8800  148.8600       7.2        81       993        95
VIS    2025250     20200   18.8800  148.8000       8.3        79       981        93
VIS    2025250     20200   18.8700  146.6100      10.2        41       965        92
VIS    2025250     20200   18.8700  146.5800      10.1        43       943        97
VIS    2025250     20200   18.8700  146.5700      10.1        43       932        96
VIS    2025250     20200   18.8700  146.5300      10.0        44       931        95
VIS    2025250     20200   18.8500  146.5100      10.0        43       939        97
VIS    2025250     20200   18.8500  146.5000      10.0        44       946        97
VIS    2025250     20200   18.8500  146.4500      10.2        48       953        94
VIS    2025250     20200   18.8500  146.4300       9.7        48       954        96
VIS    2025250     20200   18.8500  146.4200       9.1        46       954        95
VIS    2025250     20200   18.8500  146.1700      10.7        48       957        99
VIS    2025250     20200   18.8500  146.1600      10.2        48       944        99
VIS    2025250     20200   18.8600  146.1300       9.4        45       934        97
VIS    2025250     20200   18.8400  145.3500       9.1       103       737        93
VIS    2025250     20200   18.8400  145.3100       9.6        98       736        94
VIS    2025250     20200   18.8500  145.3100       9.5        96       739        95
VIS    2025250     20200   18.8500  145.2800       9.9        92       733        96
VIS    2025250     20200   18.8600  145.2500       9.8        89       753        96
VIS    2025250     20200   18.8600  145.2300      10.0        88       759        96
VIS    2025250     20200   18.8600  144.9800      11.8        46       931        97
VIS    2025250     20200   18.8500  144.9300      12.3        46       931        97
VIS    2025250     20200   18.8400  144.3200       9.5        89       713        97
VIS    2025250     20200   18.8500  144.2900       9.7        86       737        97
VIS    2025250     20200   18.8500  144.2600      10.4        78       745        93
VIS    2025250     20200   18.8500  144.1600      10.6        82       789        97
VIS    2025250     20200   18.8500  144.1400      11.1        79       768        92
VIS    2025250     20200   18.8400  144.0700      11.0        86       742        92
VIS    2025250     20200   18.8300  144.0500      11.0        85       742        91
VIS    2025250     20200   18.8300  143.7700      11.9        82       713        90
VIS    2025250     20200   18.8800  149.1900       6.3        69       982        91
VIS    2025250     20200   18.8600  149.1700       5.8        69       976        97
VIS    2025250     20200   18.8700  149.1600       5.6        65       974        97
VIS    2025250     20200   18.8700  148.8900       7.5        81       993        93
VIS    2025250     20200   18.8500  148.8800       7.4        81       981        95
VIS    2025250     20200   18.8700  148.8600       7.1        83       993        94
VIS    2025250     20200   18.8500  148.8200       7.3        66       970        94
VIS    2025250     20200   18.8700  148.7900       8.2        77       978        93
VIS    2025250     20200   18.8300  146.6000      10.3        45       965        98
VIS    2025250     20200   18.8500  146.5900      10.1        42       969        98
VIS    2025250     20200   18.8400  146.5300       9.8        44       938        97
VIS    2025250     20200   18.8500  146.5100       9.9        43       939        97
VIS    2025250     20200   18.8400  146.5000       9.9        44       947        97
VIS    2025250     20200   18.8300  146.4600      10.3        47       947        97
VIS    2025250     20200   18.8400  146.4500      10.3        48       947        96
VIS    2025250     20200   18.8400  146.4300       9.8        47       953        96
VIS    2025250     20200   18.8300  146.3700       8.9        44       932        93
VIS    2025250     20200   18.8200  146.2000       9.9        49       933        98
VIS    2025250     20200   18.8200  146.2000       9.9        49       968        99
VIS    2025250     20200   18.8400  146.1600      10.3        48       957        99
VIS    2025250     20200   18.8400  146.1500       9.9        46       944        98
VIS    2025250     20200   18.8400  145.3400       9.5       102       737        92
VIS    2025250     20200   18.8300  145.3100       9.6        98       736        92
VIS    2025250     20200   18.8200  145.3100       9.7        97       721        94
VIS    2025250     20200   18.8200  145.2700       9.7        90       716        97
VIS    2025250     20200   18.8200  145.2400      10.6        89       750        92
VIS    2025250     20200   18.8200  145.2300      11.0        91       752        92
VIS    2025250     20200   18.8300  144.9700      11.8        45       971        99
VIS    2025250     20200   18.8300  144.9600      11.9        45       971        99
VIS    2025250     20200   18.8100  144.9200      12.2        46       920        95
VIS    2025250     20200   18.8200  144.3300      10.2        89       705        96
VIS    2025250     20200   18.8200  144.3000      10.0        77       738        93
VIS    2025250     20200   18.8100  144.1600      10.2        85       796        93
VIS    2025250     20200   18.8100  144.1500      10.5        81       801        95
VIS    2025250     20200   18.8200  144.0500      10.8        87       752        93
VIS    2025250     20200   18.8300  144.0300      10.9        79       741        90
VIS    2025250     20200   18.8200  143.7800      12.0        84       715        91
VIS    2025250     20200   18.8200  143.7600      11.7        83       708        91
VIS    2025250     20200   18.8400  149.2500       7.5        62       995        94
VIS    2025250     20200   18.8400  149.2200       6.8        60       984        92
VIS    2025250     20200   18.8400  149.2000       6.4        61       977        94
VIS    2025250     20200   18.8400  149.1900       5.9        64       976        95
VIS    2025250     20200   18.8500  149.1700       5.7        68       976        96
VIS    2025250     20200   18.8300  148.9200       7.6        79       974        95
VIS    2025250     20200   18.8300  148.8600       6.8        75       987        93
VIS    2025250     20200   18.8300  148.8100       6.7        53       966        96
VIS    2025250     20200   18.8400  148.7900       6.5        54       956        95
VIS    2025250     20200   18.8200  146.5900      10.6        45       962        98
VIS    2025250     20200   18.8200  146.5000       9.6        44       947        97
VIS    2025250     20200   18.8200  146.4700      10.2        44       947        95
VIS    2025250     20200   18.8200  146.4500      10.2        46       946        97
VIS    2025250     20200   18.8200  146.4300      10.2        48       926        96
VIS    2025250     20200   18.8100  146.4000      10.3        47       916        96
VIS    2025250     20200   18.8000  146.3800       9.5        46       932        97
VIS    2025250     20200   18.8100  146.3500       9.2        46       962        98
VIS    2025250     20200   18.8100  146.3100       9.3        48       978        94
VIS    2025250     20200   18.8000  146.2600      10.8        48       960        97
VIS    2025250     20200   18.8200  146.1700       9.9        45       957        98
VIS    2025250     20200   18.8000  145.3800      10.8        96       708        95
VIS    2025250     20200   18.8100  145.2700       9.6        87       716        97
VIS    2025250     20200   18.8000  145.2500      10.2        77       749        90
VIS    2025250     20200   18.8100  145.0000      11.8        47       971        94
VIS    2025250     20200   18.7900  144.9700      11.9        45       974        98
VIS    2025250     20200   18.8000  144.9500      12.0        47       974        99
VIS    2025250     20200   18.8100  144.9300      12.1        46       931        97
VIS    2025250     20200   18.7800  144.1500      10.1        84       788        94
VIS    2025250     20200   18.7900  144.0900      10.9        77       774        91
VIS    2025250     20200   18.8000  144.0500      10.7        86       764        95
VIS    2025250     20200   18.8000  144.0400      10.7        85       749        93
VIS    2025250     20200   18.7900  143.9800      11.9        85       739        91
VIS    2025250     20200   18.7800  143.9400      13.0        91       753        91
VIS    2025250     20200   18.7800  143.9300      12.2        84       759        91
VIS    2025250     20200   18.7800  143.9100      12.1        82       759        91
VIS    2025250     20200   18.7800  143.8000      11.3        85       722        90
VIS    2025250     20200   18.8000  143.7700      11.4        87       720        93
VIS    2025250     20200   18.8000  143.7600      11.2        86       712        92
VIS    2025250     20200   18.8100  149.2500       7.5        65       981        98
VIS    2025250     20200   18.8100  149.2100       6.8        69       922        95
VIS    2025250     20200   18.8100  149.2000       6.5        70       912        96
VIS    2025250     20200   18.8300  149.1700       5.7        68       921        95
VIS    2025250     20200   18.8300  149.1500       5.2        67       940        91
VIS    2025250     20200   18.8100  149.1100       6.1        68       954        94
VIS    2025250     20200   18.8100  149.0900       6.0        70       950        92
VIS    2025250     20200   18.8200  149.0600       5.6        71       969        92
VIS    2025250     20200   18.8300  149.0500       5.4        69       969        93
VIS    2025250     20200   18.8200  148.8600       7.1        79       987        96
VIS    2025250     20200   18.8200  148.7900       6.2        37       962        93
VIS    2025250     20200   18.8000  146.4700      10.2        43       947        92
VIS    2025250     20200   18.8000  146.4700      10.3        43       947        91
VIS    2025250     20200   18.7800  146.4300      10.9        45       928        95
VIS    2025250     20200   18.8000  146.4100      10.7        47       914        95
VIS    2025250     20200   18.8000  146.3700       9.3        45       932        97
VIS    2025250     20200   18.7800  146.3500       9.1        46       937        98
VIS    2025250     20200   18.8000  146.3400       9.0        44       962        98
VIS    2025250     20200   18.8000  146.2800      10.9        48       962        95
VIS    2025250     20200   18.7800  146.1900      10.1        47       933        97
VIS    2025250     20200   18.7800  145.5100      10.5        70       951        90
VIS    2025250     20200   18.7700  145.4900      10.1        72       951        92
VIS    2025250     20200   18.7600  144.9500      12.1        45       969        98
VIS    2025250     20200   18.7700  144.9300      12.3        48       910        95
VIS    2025250     20200   18.7600  144.3400      10.2        85       712        91
VIS    2025250     20200   18.7600  144.3300      10.4        84       746        92
VIS    2025250     20200   18.7600  144.3000      10.1        74       797        90
VIS    2025250     20200   18.7600  144.2300      10.6        84       766        95
VIS    2025250     20200   18.7600  144.1500      10.1        83       757        96
VIS    2025250     20200   18.7700  144.1400      10.1        87       774        95
VIS    2025250     20200   18.7600  144.1100      10.3        83       788        93
VIS    2025250     20200   18.7800  144.0800      10.9        78       792        94
VIS    2025250     20200   18.7800  144.0500      10.7        80       789        96
VIS    2025250     20200   18.7800  143.9900      11.9        82       736        90
VIS    2025250     20200   18.7600  143.9500      12.9        86       753        91
VIS    2025250     20200   18.7800  143.9300      12.3        85       759        91
VIS    2025250     20200   18.7800  143.9100      12.0        81       753        90
VIS    2025250     20200   18.7600  143.7800      11.3        88       724        91
VIS    2025250     20200   18.7800  143.7600      11.1        88       724        94
VIS    2025250     20200   18.7600  143.7400      10.8        87       702        93
VIS    2025250     20200   18.7900  149.2700       7.9        53       984        92
VIS    2025250     20200   18.7900  149.2100       7.1        70       932        96
VIS    2025250     20200   18.7800  149.1700       6.7        73       918        96
VIS    2025250     20200   18.8000  149.1500       5.9        68       921        97
VIS    2025250     20200   18.7900  149.1100       5.9        65       964        95
VIS    2025250     20200   18.8000  149.0900       5.8        70       950        94
VIS    2025250     20200   18.7900  149.0700       5.0        65       942        91
VIS    2025250     20200   18.7600  146.4800      10.3        43       947        91
VIS    2025250     20200   18.7700  146.4500      10.7        44       943        95
VIS    2025250     20200   18.7500  146.4300      10.8        45       935        97
VIS    2025250     20200   18.7700  146.4200      10.9        45       916        94
VIS    2025250     20200   18.7600  146.3800      10.6        44       915        93
VIS    2025250     20200   18.7600  146.3700       9.8        45       915        95
VIS    2025250     20200   18.7600  146.3400       9.0        44       937        98
VIS    2025250     20200   18.7700  146.2600      11.1        48       960        97
VIS    2025250     20200   18.7500  146.2200      10.7        48       956        99
VIS    2025250     20200   18.7500  146.2200      10.6        48       956        99
VIS    2025250     20200   18.7500  145.8900      11.1        49       976        98
VIS    2025250     20200   18.7600  145.4900       9.9        76       951        91
VIS    2025250     20200   18.7600  145.2500      10.2        79       732        94
VIS    2025250     20200   18.7600  144.9700      12.2        43       981        97
VIS    2025250     20200   18.7400  144.9600      12.1        45       945        98
VIS    2025250     20200   18.7500  144.9400      12.2        46       945        98
VIS    2025250     20200   18.7500  144.3400      10.3        86       712        92
VIS    2025250     20200   18.7400  144.3300      10.2        84       712        93
VIS    2025250     20200   18.7400  144.2900      10.0        78       780        92
VIS    2025250     20200   18.7300  144.2700      10.2        91       764        93
VIS    2025250     20200   18.7400  144.2600      10.1        89       764        95
VIS    2025250     20200   18.7300  144.2300      10.8        86       766        96
VIS    2025250     20200   18.7500  144.1600      10.2        79       757        93
VIS    2025250     20200   18.7300  144.1300      10.3        79       775        98
VIS    2025250     20200   18.7500  144.1100      10.2        83       787        96
VIS    2025250     20200   18.7400  144.0800      10.8        79       775        98
VIS    2025250     20200   18.7400  144.0200      11.8        76       734        91
VIS    2025250     20200   18.7400  144.0100      11.6        76       734        90
VIS    2025250     20200   18.7500  143.9500      12.6        84       757        90
VIS    2025250     20200   18.7500  143.9300      13.0        86       753        95
VIS    2025250     20200   18.7300  143.9100      13.2        83       748        94
VIS    2025250     20200   18.7300  143.8800      11.9        89       731        97
VIS    2025250     20200   18.7400  143.8700      11.3        90       731        98
VIS    2025250     20200   18.7500  143.8400      11.2        87       722        93
VIS    2025250     20200   18.7400  143.8200      11.0        85       721        94
VIS    2025250     20200   18.7500  143.8000      10.9        87       721        90
VIS    2025250     20200   18.7400  142.5000       7.6       132       187        99
VIS    2025250     20200   18.7400  142.4900       6.7       131       186        98
VIS    2025250     20200   18.7800  149.2100       7.3        69       971        97
VIS    2025250     20200   18.7800  149.1700       6.8        73       921        95
VIS    2025250     20200   18.7700  149.1600       6.8        72       958        97
VIS    2025250     20200   18.7700  149.1100       6.9        61       973        92
VIS    2025250     20200   18.7700  149.0900       5.9        61       938        97
VIS    2025250     20200   18.7800  149.0800       5.6        64       940        97
VIS    2025250     20200   18.7600  149.0400       4.3        53       942        90
VIS    2025250     20200   18.7700  149.0200       4.6        49       949        90
VIS    2025250     20200   18.7800  149.0000       4.8        46       953        93
VIS    2025250     20200   18.7300  146.6400      10.1        44       977        95
VIS    2025250     20200   18.7300  146.6400       9.9        44       977        92
VIS    2025250     20200   18.7500  146.4800      10.2        42       947        93
VIS    2025250     20200   18.7500  146.4500      10.6        44       947        98
VIS    2025250     20200   18.7500  146.4300      10.7        45       935        97
VIS    2025250     20200   18.7300  146.4000      10.8        44       916        96
VIS    2025250     20200   18.7300  146.3900      10.9        44       916        96
VIS    2025250     20200   18.7400  146.3700      10.5        43       915        97
VIS    2025250     20200   18.7300  146.3500      10.3        41       917        96
VIS    2025250     20200   18.7500  146.2600      11.2        47       960        95
VIS    2025250     20200   18.7300  146.2300      10.6        46       956        98
VIS    2025250     20200   18.7300  146.2200      10.3        47       956        97
VIS    2025250     20200   18.7400  145.9000      11.1        49       976        98
VIS    2025250     20200   18.7400  145.8900      11.2        49       976        97
VIS    2025250     20200   18.7300  145.8500      11.6        47       967        97
VIS    2025250     20200   18.7300  144.9800      12.2        43       981        95
VIS    2025250     20200   18.7300  144.9500      12.1        46       945        99
VIS    2025250     20200   18.7100  144.9300      12.3        47       898        96
VIS    2025250     20200   18.7100  144.8800      12.9        48       869        90
VIS    2025250     20200   18.7100  144.8300      10.5        58       777        90
VIS    2025250     20200   18.7200  144.3400      10.1        87       712        95
VIS    2025250     20200   18.7300  144.3100       9.8        83       764        95
VIS    2025250     20200   18.7100  144.2800      10.1        89       764        93
VIS    2025250     20200   18.7200  144.2800      10.1        90       764        92
VIS    2025250     20200   18.7200  144.2500      10.7        89       722        96
VIS    2025250     20200   18.7100  144.2200      11.1        83       719        92
VIS    2025250     20200   18.7100  144.1900      10.7        82       727        91
VIS    2025250     20200   18.7100  144.1800      10.6        80       727        91
VIS    2025250     20200   18.7100  144.1600      10.5        78       744        93
VIS    2025250     20200   18.7200  144.1300      10.5        77       758        95
VIS    2025250     20200   18.7300  144.1000      10.3        91       787        95
VIS    2025250     20200   18.7300  144.0900      10.5        89       776        98
VIS    2025250     20200   18.7300  144.0600      11.1        76       741        92
VIS    2025250     20200   18.7100  144.0400      11.3        76       737        92
VIS    2025250     20200   18.7200  143.9400      11.8        70       766        91
VIS    2025250     20200   18.7200  143.9300      11.9        74       766        94
VIS    2025250     20200   18.7100  143.9000      12.5        85       739        93
VIS    2025250     20200   18.7200  143.8700      11.8        89       723        94
VIS    2025250     20200   18.7300  143.8700      11.6        89       723        96
VIS    2025250     20200   18.7200  143.8300      10.9        88       713        91
VIS    2025250     20200   18.7500  149.2500       8.6        54       985        90
VIS    2025250     20200   18.7500  149.1400       7.9        62       990        94
VIS    2025250     20200   18.7400  149.1200       7.4        61       949        91
VIS    2025250     20200   18.7400  149.0800       5.6        66       922        92
VIS    2025250     20200   18.7200  146.6500      10.3        43       979        95
VIS    2025250     20200   18.7200  146.6400      10.1        43       979        97
VIS    2025250     20200   18.7100  146.6200      10.1        42       977        98
VIS    2025250     20200   18.7200  146.4500      10.4        44       957        99
VIS    2025250     20200   18.7200  146.4300      10.5        44       957        99
VIS    2025250     20200   18.7100  146.4000      10.7        43       947        99
VIS    2025250     20200   18.7100  146.3900      11.0        43       943        98
VIS    2025250     20200   18.7200  146.3600      11.0        42       917        96
VIS    2025250     20200   18.7000  146.3400      11.1        42       928        96
VIS    2025250     20200   18.7100  146.3200      10.4        41       935        96
VIS    2025250     20200   18.7000  146.2700      10.0        47       962        95
VIS    2025250     20200   18.7200  146.2400      10.6        47       956        98
VIS    2025250     20200   18.7100  145.9200      11.0        48       978        98
VIS    2025250     20200   18.7000  145.8800      11.4        47       961        99
VIS    2025250     20200   18.7100  145.8700      11.4        48       961        99
VIS    2025250     20200   18.7000  145.8400      11.5        47       927        98
VIS    2025250     20200   18.6900  145.2500      10.6       103       734        90
VIS    2025250     20200   18.7000  144.9700      11.9        44       967        97
VIS    2025250     20200   18.7100  144.9500      12.0        46       944       100
VIS    2025250     20200   18.7100  144.9300      12.2        47       885        93
VIS    2025250     20200   18.7000  144.9000      12.7        48       870        90
VIS    2025250     20200   18.6900  144.8500      11.8        50       856        90
VIS    2025250     20200   18.7000  144.8300      10.1        59       752        90
VIS    2025250     20200   18.6900  144.3300      10.4        89       765        97
VIS    2025250     20200   18.6900  144.3200      10.4        86       765        94
VIS    2025250     20200   18.7000  144.2800      10.4        90       736        91
VIS    2025250     20200   18.6900  144.2700      10.6        88       708        90
VIS    2025250     20200   18.7000  144.2400      11.0        85       706        93
VIS    2025250     20200   18.6800  144.2100      11.2        80       719        93
VIS    2025250     20200   18.6900  144.2000      11.0        82       725        94
VIS    2025250     20200   18.7000  144.1800      10.4        85       727        94
VIS    2025250     20200   18.6900  144.1500      10.2        83       744        96
VIS    2025250     20200   18.7000  144.1300      10.4        81       745        95
VIS    2025250     20200   18.7000  144.0800      10.2        94       787        94
VIS    2025250     20200   18.7000  144.0600      10.3        84       743        95
VIS    2025250     20200   18.7000  144.0600      10.6        82       743        95
VIS    2025250     20200   18.6900  144.0300      11.8        82       741        92
VIS    2025250     20200   18.6800  144.0100      12.0        80       745        90
VIS    2025250     20200   18.6800  143.9300      12.0        84       752        93
VIS    2025250     20200   18.7100  149.1500       7.2        68       983        91
VIS    2025250     20200   18.7200  149.1200       7.2        64       949        98
VIS    2025250     20200   18.7300  149.1200       7.3        61       949        94
VIS    2025250     20200   18.7200  149.0900       5.8        61       912        90
VIS    2025250     20200   18.6900  146.6500       9.7        43       973        97
VIS    2025250     20200   18.6900  146.6200      10.0        42       951        98
VIS    2025250     20200   18.6900  146.6100      10.2        41       951        99
VIS    2025250     20200   18.6800  146.4200      10.1        40       971       100
VIS    2025250     20200   18.7000  146.3700      11.4        42       947        97
VIS    2025250     20200   18.6900  146.3600      11.5        42       947        97
VIS    2025250     20200   18.6900  146.3300      11.0        45       949        94
VIS    2025250     20200   18.6800  146.3000      10.5        46       959        98
VIS    2025250     20200   18.6800  146.2900      10.3        46       959        98
VIS    2025250     20200   18.6800  146.2700      10.2        45       962        95
VIS    2025250     20200   18.6700  145.9600      10.6        47       970        98
VIS    2025250     20200   18.6800  145.8900      11.3        44       961        97
VIS    2025250     20200   18.6900  145.8700      11.4        46       958        99
VIS    2025250     20200   18.6800  145.8400      11.4        47       932        99
VIS    2025250     20200   18.6900  145.8400      11.4        47       927        98
VIS    2025250     20200   18.6700  145.6900      11.6        47       984        99
VIS    2025250     20200   18.6700  145.4300       9.3        97       702        96
VIS    2025250     20200   18.6900  145.2500      10.6       103       734        90
VIS    2025250     20200   18.6800  145.2400      10.3        95       737        95
VIS    2025250     20200   18.6900  144.9500      12.1        45       949        99
VIS    2025250     20200   18.6800  144.9300      12.2        45       917        98
VIS    2025250     20200   18.6700  144.9100      12.6        45       885        92
VIS    2025250     20200   18.6800  144.8300      10.0        57       800        91
VIS    2025250     20200   18.6800  144.3200      10.8        90       757        94
VIS    2025250     20200   18.6800  144.3100      11.0        89       727        96
VIS    2025250     20200   18.6600  144.2000      10.9        76       743        93
VIS    2025250     20200   18.6800  144.1900      10.6        83       728        94
VIS    2025250     20200   18.6800  144.1600       9.9        84       745        97
VIS    2025250     20200   18.6600  144.1400       9.7        82       754        97
VIS    2025250     20200   18.6600  144.1100      10.2        88       765        98
VIS    2025250     20200   18.6600  144.0800      10.4        89       765        98
VIS    2025250     20200   18.6800  144.0500      11.0        84       741        96
VIS    2025250     20200   18.6600  144.0300      11.6        88       731        97
VIS    2025250     20200   18.6800  143.9200      12.0        85       748        95
VIS    2025250     20200   18.7000  149.1300       6.9        68       920        98
VIS    2025250     20200   18.6900  149.1200       6.7        70       920        97
VIS    2025250     20200   18.6900  149.0800       4.5        61       912        91
VIS    2025250     20200   18.6700  146.6500       9.4        44       973        96
VIS    2025250     20200   18.6800  146.6200      10.1        42       955        98
VIS    2025250     20200   18.6700  146.3400      11.2        47       956        91
VIS    2025250     20200   18.6500  146.0500      10.9        48       972        99
VIS    2025250     20200   18.6600  146.0300      11.5        49       976        97
VIS    2025250     20200   18.6500  146.0100      11.5        49       978        95
VIS    2025250     20200   18.6700  145.8500      11.2        46       948       100
VIS    2025250     20200   18.6500  145.7600      11.4        42       955        99
VIS    2025250     20200   18.6700  145.6900      11.5        47       984        98
VIS    2025250     20200   18.6500  145.4400       9.3        98       718        93
VIS    2025250     20200   18.6500  145.2700      10.0       104       716        93
VIS    2025250     20200   18.6400  145.2300       9.1        92       747        97
VIS    2025250     20200   18.6500  145.2300       9.6        91       769        96
VIS    2025250     20200   18.6500  144.9700      12.1        43       998        94
VIS    2025250     20200   18.6500  144.9500      12.2        44       949        98
VIS    2025250     20200   18.6600  144.9300      12.4        44       890        93
VIS    2025250     20200   18.6600  144.9100      13.0        45       884        90
VIS    2025250     20200   18.6400  144.8100       8.9        62       721        90
VIS    2025250     20200   18.6500  144.3200      10.7        84       714        91
VIS    2025250     20200   18.6500  144.2900      11.3        85       701        94
VIS    2025250     20200   18.6500  144.2200      11.0        77       743        93
VIS    2025250     20200   18.6500  144.2000      10.7        74       748        93
VIS    2025250     20200   18.6400  144.1700      10.2        71       774        94
VIS    2025250     20200   18.6500  144.1600       9.8        81       774        99
VIS    2025250     20200   18.6400  144.1300       9.9        83       765        98
VIS    2025250     20200   18.6300  144.1100      10.2        83       765        98
VIS    2025250     20200   18.6500  144.0900      10.4        90       765        99
VIS    2025250     20200   18.6500  144.0500      11.2        93       730        95
VIS    2025250     20200   18.6300  144.0400      11.6        90       730        98
VIS    2025250     20200   18.6300  144.0100      11.7        77       738        92
VIS    2025250     20200   18.6400  143.9200      11.4        77       731        90
VIS    2025250     20200   18.6300  142.9000       7.6       112       193        91
VIS    2025250     20200   18.6700  149.1400       7.3        65       969        93
VIS    2025250     20200   18.6600  149.1200       6.9        66       966        98
VIS    2025250     20200   18.6600  149.1100       6.7        71       917        96
VIS    2025250     20200   18.6600  149.0800       5.0        73       912        92
VIS    2025250     20200   18.6500  146.3600      11.4        45       981        93
VIS    2025250     20200   18.6500  146.3400      11.2        48       958        90
VIS    2025250     20200   18.6500  146.2800      10.4        44       958       100
VIS    2025250     20200   18.6300  146.2500      10.7        47       956        95
VIS    2025250     20200   18.6500  146.0600      10.5        46       976        97
VIS    2025250     20200   18.6500  146.0400      11.0        48       976        98
VIS    2025250     20200   18.6400  146.0200      11.2        48       972        98
VIS    2025250     20200   18.6300  146.0000      11.3        49       972        96
VIS    2025250     20200   18.6300  145.4500       9.4        98       718        90
VIS    2025250     20200   18.6200  145.3000       9.9        99       716        95
VIS    2025250     20200   18.6400  145.2800      10.0       103       718        92
VIS    2025250     20200   18.6200  145.2500       9.0        91       758        94
VIS    2025250     20200   18.6400  145.2200       9.6        92       759        96
VIS    2025250     20200   18.6300  144.7900       9.1        71       706        92
VIS    2025250     20200   18.6300  144.2000      10.6        67       798        98
VIS    2025250     20200   18.6300  144.1700      10.3        69       774        93
VIS    2025250     20200   18.6300  144.1200      10.3        82       765        96
VIS    2025250     20200   18.6300  144.1100      10.4        83       765        97
VIS    2025250     20200   18.6200  144.0800      11.0        89       710        92
VIS    2025250     20200   18.6200  144.0600      11.1        91       711        94
VIS    2025250     20200   18.6100  144.0300      11.2        78       736        92
VIS    2025250     20200   18.6100  144.0000      12.0        76       750        90
VIS    2025250     20200   18.6400  149.1400       7.3        63       969        94
VIS    2025250     20200   18.6400  149.1300       7.0        68       964        98
VIS    2025250     20200   18.6400  149.1100       6.8        73       964        95
VIS    2025250     20200   18.6200  146.2500      10.7        47       956        95
VIS    2025250     20200   18.6100  146.0200      10.9        47       970        99
VIS    2025250     20200   18.6100  145.9900      11.1        47       959       100
VIS    2025250     20200   18.6100  145.9900      11.1        47       959       100
VIS    2025250     20200   18.6100  145.3100       9.5        96       718        97
VIS    2025250     20200   18.5900  145.2700       8.7        84       779        97
VIS    2025250     20200   18.6100  145.2500       8.7        87       759        96
VIS    2025250     20200   18.5900  145.2300       9.5        86       772        91
VIS    2025250     20200   18.6000  145.2200      10.1        86       799        93
VIS    2025250     20200   18.6000  144.9600      11.8        47       950        91
VIS    2025250     20200   18.6000  144.8100      10.0        65       722        90
VIS    2025250     20200   18.6100  144.2500      11.9        83       733        92
VIS    2025250     20200   18.5900  144.2300      11.4        69       813        94
VIS    2025250     20200   18.5800  143.8800      10.5        83       721        90
VIS    2025250     20200   18.5900  143.8600      10.2        85       718        91
VIS    2025250     20200   18.5800  146.0600      10.7        47       954        95
VIS    2025250     20200   18.6000  146.0300      10.9        45       967        98
VIS    2025250     20200   18.5700  145.4700      10.5       102       729        90
VIS    2025250     20200   18.5800  145.4600      10.2       101       718        92
VIS    2025250     20200   18.5800  145.3400       9.8        96       711        96
VIS    2025250     20200   18.5900  145.3100       9.5        95       718        97
VIS    2025250     20200   18.5800  145.2800       8.5        82       832        98
VIS    2025250     20200   18.5800  145.2600       8.4        79       801        99
VIS    2025250     20200   18.5700  144.9700      12.2        47       945        90
VIS    2025250     20200   18.5700  144.9400      12.3        46       895        93
VIS    2025250     20200   18.5900  144.9300      12.3        45       890        93
VIS    2025250     20200   18.5800  144.2700      11.6        80       747        91
VIS    2025250     20200   18.5700  144.2400      11.0        72       813        92
VIS    2025250     20200   18.5600  144.2300      11.0        72       813        93
VIS    2025250     20200   18.5800  144.2000      11.3        64       834        92
VIS    2025250     20200   18.5600  143.9000      10.6        77       720        91
VIS    2025250     20200   18.5600  143.8900      10.5        80       721        93
VIS    2025250     20200   18.5600  143.8600      10.5        82       722        94
VIS    2025250     20200   18.5800  149.1400       6.1        58       958        92
VIS    2025250     20200   18.5600  146.5200      10.3        40       989        94
VIS    2025250     20200   18.5600  146.4800      10.7        42       989        93
VIS    2025250     20200   18.5600  146.4600      10.9        44       966        93
VIS    2025250     20200   18.5600  146.4300      10.6        45       966        95
VIS    2025250     20200   18.5500  146.3900       9.7        46       990        96
VIS    2025250     20200   18.5500  146.1200      10.8        45       951        97
VIS    2025250     20200   18.5500  145.4700      10.1        97       777        90
VIS    2025250     20200   18.5500  145.4700      10.0        95       718        96
VIS    2025250     20200   18.5700  145.3400       9.4        94       711        96
VIS    2025250     20200   18.5600  145.3100       8.6        91       787        94
VIS    2025250     20200   18.5400  145.2600       9.1        91       837        93
VIS    2025250     20200   18.5600  145.2300       8.7        80       808        97
VIS    2025250     20200   18.5400  144.2500      11.0        65       826        93
VIS    2025250     20200   18.5600  144.2300      10.9        72       802        96
VIS    2025250     20200   18.5500  144.2100      11.0        74       772        94
VIS    2025250     20200   18.5500  144.0100      10.8        73       745        90
VIS    2025250     20200   18.5500  143.9000      10.6        75       719        91
VIS    2025250     20200   18.5500  143.8500      10.7        81       725        94
VIS    2025250     20200   18.5600  149.1500       6.0        62       957        95
VIS    2025250     20200   18.5800  149.1400       6.1        57       958        93
VIS    2025250     20200   18.5800  149.1100       6.0        62       946        95
VIS    2025250     20200   18.5500  146.5200      10.3        40       989        94
VIS    2025250     20200   18.5500  146.5200      10.2        41       989        96
VIS    2025250     20200   18.5400  146.4800      10.5        42       964        98
VIS    2025250     20200   18.5400  146.4600      10.8        44       964        98
VIS    2025250     20200   18.5400  146.4300      10.6        46       954        98
VIS    2025250     20200   18.5300  146.4000      10.1        45       962        96
VIS    2025250     20200   18.5300  146.3900       9.8        45       962        96
VIS    2025250     20200   18.5300  145.4700      10.0        90       782        91
VIS    2025250     20200   18.5200  144.2900      11.0        78       752        91
VIS    2025250     20200   18.5300  144.2500      11.2        60       839        93
VIS    2025250     20200   18.5300  144.2200      11.0        74       768        93
VIS    2025250     20200   18.5200  143.8600      10.7        78       726        92
VIS    2025250     20200   18.5000  142.9200       7.6       110       186        91
VIS    2025250     20200   18.5500  149.1400       6.4        58       933        98
VIS    2025250     20200   18.5500  149.1400       6.2        58       933        97
VIS    2025250     20200   18.5300  146.4800      10.4        43       964        98
VIS    2025250     20200   18.5300  146.4800      10.4        43       964        99
VIS    2025250     20200   18.5200  146.4500      10.7        45       957        99
VIS    2025250     20200   18.5100  146.4200      10.7        45       952        97
VIS    2025250     20200   18.5100  146.4000      10.5        44       943        97
VIS    2025250     20200   18.5000  146.1800      11.0        46       934        98
VIS    2025250     20200   18.5100  146.1500      10.7        44       934        98
VIS    2025250     20200   18.5000  145.4700      10.1        80       750        91
VIS    2025250     20200   18.5000  145.3500       9.3        91       704        95
VIS    2025250     20200   18.5100  145.3200       8.7        91       760        91
VIS    2025250     20200   18.5100  145.3100       8.5        96       777        92
VIS    2025250     20200   18.5100  144.9800      13.1        43       957        96
VIS    2025250     20200   18.4900  144.9300      13.0        44       890        91
VIS    2025250     20200   18.4900  144.9000      13.0        45       905        95
VIS    2025250     20200   18.5000  144.9000      12.8        47       905        96
VIS    2025250     20200   18.4900  144.2900      10.8        75       757        91
VIS    2025250     20200   18.5100  144.2500      11.7        55       864        94
VIS    2025250     20200   18.4900  144.1600      10.8        76       750        93
VIS    2025250     20200   18.5200  149.1600       7.1        53       953        90
VIS    2025250     20200   18.5200  149.1500       6.6        55       953        94
VIS    2025250     20200   18.4800  146.5300      10.4        43       980        92
VIS    2025250     20200   18.4900  146.4800      10.4        45       984        91
VIS    2025250     20200   18.4800  146.4500      10.9        46       966        91
VIS    2025250     20200   18.4900  146.4200      10.9        44       946        95
VIS    2025250     20200   18.4900  146.4100      11.0        43       945        96
VIS    2025250     20200   18.4900  146.3900      10.7        42       934        96
VIS    2025250     20200   18.4900  146.2600      10.6        48       923        97
VIS    2025250     20200   18.4800  146.2100      10.7        45       979        97
VIS    2025250     20200   18.5000  146.1700      11.0        45       934        98
VIS    2025250     20200   18.4900  146.1500      10.9        44       955        98
VIS    2025250     20200   18.4800  146.1200      11.0        45       962        99
VIS    2025250     20200   18.4800  146.0800      11.5        44       961        98
VIS    2025250     20200   18.4800  146.0700      11.5        44       961        98
VIS    2025250     20200   18.4800  145.4400       9.7        91       727        95
VIS    2025250     20200   18.4700  145.3500       9.1        89       724        98
VIS    2025250     20200   18.4900  145.3300       8.8        88       755        96
VIS    2025250     20200   18.4800  145.2500       9.6        97       735        91
VIS    2025250     20200   18.4800  144.9200      13.2        44       890        91
VIS    2025250     20200   18.4800  144.8900      12.7        47       876        91
VIS    2025250     20200   18.4700  144.8900      12.1        50       873        92
VIS    2025250     20200   18.4600  144.2600      11.2        65       812        94
VIS    2025250     20200   18.4600  144.2400      11.1        64       812        95
VIS    2025250     20200   18.4600  144.1700      10.7        74       745        92
VIS    2025250     20200   18.4800  144.1500      10.9        69       758        91
VIS    2025250     20200   18.4900  149.1700       7.6        66       953        93
VIS    2025250     20200   18.4900  149.1400       6.6        64       937        90
VIS    2025250     20200   18.4600  146.5000      10.3        44       968        93
VIS    2025250     20200   18.4600  146.5000      10.3        44       980        94
VIS    2025250     20200   18.4600  146.4500      10.9        45       966        97
VIS    2025250     20200   18.4600  146.4400      11.2        45       966        96
VIS    2025250     20200   18.4600  146.4300      11.2        44       953        98
VIS    2025250     20200   18.4800  146.4000      11.0        42       939        97
VIS    2025250     20200   18.4600  146.3600      10.7        45       950        98
VIS    2025250     20200   18.4500  146.2500      10.8        45       916        97
VIS    2025250     20200   18.4700  146.2300      10.5        45       940        99
VIS    2025250     20200   18.4700  146.2100      10.7        45       974        99
VIS    2025250     20200   18.4700  146.1300      11.1        44       966        98
VIS    2025250     20200   18.4600  146.0900      11.3        45       957        98
VIS    2025250     20200   18.4600  146.0800      11.4        44       957        97
VIS    2025250     20200   18.4500  145.7700       8.7        49       994        97
VIS    2025250     20200   18.4500  145.7500       9.7        45       994        95
VIS    2025250     20200   18.4700  145.4400       9.8        93       727        93
VIS    2025250     20200   18.4700  145.3600       9.1        90       724        98
VIS    2025250     20200   18.4500  145.3400       8.7        87       762        97
VIS    2025250     20200   18.4600  145.3000       8.8        86       765        97
VIS    2025250     20200   18.4700  145.2700       9.0        92       752        92
VIS    2025250     20200   18.4600  145.2700       9.1        91       752        91
VIS    2025250     20200   18.4500  144.8500       9.5        78       711        93
VIS    2025250     20200   18.4500  144.2700      11.2        68       801        93
VIS    2025250     20200   18.4400  144.2400      12.0        63       791        94
VIS    2025250     20200   18.4400  144.2300      12.0        64       774        90
VIS    2025250     20200   18.4600  144.1700      10.8        72       741        91
VIS    2025250     20200   18.4600  149.2000       7.4        63       954        91
VIS    2025250     20200   18.4800  149.1900       7.2        64       954        99
VIS    2025250     20200   18.4700  149.1600       6.0        64       939        96
VIS    2025250     20200   18.4500  146.4800      10.2        44       965        97
VIS    2025250     20200   18.4500  146.4500      11.0        45       966        98
VIS    2025250     20200   18.4500  146.4300      11.2        44       961        98
VIS    2025250     20200   18.4400  146.4100      11.2        42       962        98
VIS    2025250     20200   18.4500  146.3700      10.8        45       950        98
VIS    2025250     20200   18.4500  146.3600      10.8        47       954        97
VIS    2025250     20200   18.4300  146.2400      10.9        45       916        98
VIS    2025250     20200   18.4500  146.1300      11.1        45       966        94
VIS    2025250     20200   18.4500  146.1000      11.3        45       957        98
VIS    2025250     20200   18.4400  146.0900      11.2        44       941        98
VIS    2025250     20200   18.4400  145.7700       8.3        52       994        91
VIS    2025250     20200   18.4300  145.7400       9.8        46       994        92
VIS    2025250     20200   18.4300  145.7200      10.1        45       991        95
VIS    2025250     20200   18.4300  145.7100      10.3        44       961        95
VIS    2025250     20200   18.4400  145.5100       9.6        73       930        92
VIS    2025250     20200   18.4300  145.3500       8.6        86       747        96
VIS    2025250     20200   18.4300  145.3300       8.7        86       792        96
VIS    2025250     20200   18.4300  145.2900       9.2        88       784        94
VIS    2025250     20200   18.4300  145.2600       8.8        87       781        96
VIS    2025250     20200   18.4400  145.0000      11.9        50       938        98
VIS    2025250     20200   18.4300  145.0000      11.7        52       938        98
VIS    2025250     20200   18.4200  144.8700      10.1        68       745        93
VIS    2025250     20200   18.4300  144.2800      10.8        74       791        95
VIS    2025250     20200   18.4300  144.2500      11.8        63       798        95
VIS    2025250     20200   18.4400  149.1500       4.8        52       952        93
VIS    2025250     20200   18.4400  149.1400       4.7        51       952        90
VIS    2025250     20200   18.4500  149.0000       5.1        59       919        94
VIS    2025250     20200   18.4300  146.4500      10.8        44       978        98
VIS    2025250     20200   18.4200  146.4300      11.1        44       978        98
VIS    2025250     20200   18.4100  146.3900      10.8        47       980        94
VIS    2025250     20200   18.4300  146.3800      10.9        45       971        96
VIS    2025250     20200   18.4200  146.2200      11.0        44       934        99
VIS    2025250     20200   18.4100  146.1300      11.1        46       991        97
VIS    2025250     20200   18.4200  146.0900      11.1        44       933        97
VIS    2025250     20200   18.4200  145.7200      10.0        46       961        95
VIS    2025250     20200   18.4100  145.6900      10.5        46       956        98
VIS    2025250     20200   18.4100  145.3500       8.7        88       747        94
VIS    2025250     20200   18.4200  145.3200       8.8        87       792        94
VIS    2025250     20200   18.4000  145.3100       9.2        88       794        90
VIS    2025250     20200   18.4100  145.0300      12.3        43       973        96
VIS    2025250     20200   18.4000  144.9900      11.5        51       938        93
VIS    2025250     20200   18.3900  144.8800       9.6        62       749        92
VIS    2025250     20200   18.4000  144.8800       9.4        65       749        93
VIS    2025250     20200   18.4000  144.2700      10.1        70       792        94
VIS    2025250     20200   18.4000  144.1000      11.2        76       748        90
VIS    2025250     20200   18.4100  144.0700      11.0        76       748        93
VIS    2025250     20200   18.4100  149.2300       7.0        71       960        91
VIS    2025250     20200   18.3900  146.4500      11.0        45       978        96
VIS    2025250     20200   18.3900  146.4400      11.0        46       974        95
VIS    2025250     20200   18.3800  146.4000      10.8        48       961        94
VIS    2025250     20200   18.4000  146.3200      10.8        51       970        96
VIS    2025250     20200   18.3900  146.3000      11.2        45       972        97
VIS    2025250     20200   18.3800  146.2900      11.0        45       972        92
VIS    2025250     20200   18.4000  146.2000      11.1        43       979        99
VIS    2025250     20200   18.4000  146.0900      11.2        44       971        99
VIS    2025250     20200   18.3900  145.7800       9.5        62       964        92
VIS    2025250     20200   18.4000  145.7700       9.9        57       964        90
VIS    2025250     20200   18.3900  145.7200       8.8        58       933        93
VIS    2025250     20200   18.3900  145.7200       9.1        55       933        94
VIS    2025250     20200   18.3800  145.6700      10.0        43       931        99
VIS    2025250     20200   18.3800  145.6400       8.7        56       957        93
VIS    2025250     20200   18.3700  145.3600       9.0        91       726        96
VIS    2025250     20200   18.3700  145.3100       8.8        85       794        92
VIS    2025250     20200   18.3900  145.2900       9.5        85       795        90
VIS    2025250     20200   18.3900  144.8800       9.1        65       749        94
VIS    2025250     20200   18.3800  144.1300      11.3        73       734        91
VIS    2025250     20200   18.3800  144.1000      10.6        74       768        96
VIS    2025250     20200   18.3800  144.0700      10.6        69       757        92
VIS    2025250     20200   18.3700  146.4000      11.0        46       933        98
VIS    2025250     20200   18.3700  146.3900      10.8        45       927        98
VIS    2025250     20200   18.3700  146.3500      10.0        47       925        99
VIS    2025250     20200   18.3700  146.3400      10.4        48       971        98
VIS    2025250     20200   18.3600  146.3000      11.1        45       974        96
VIS    2025250     20200   18.3600  146.2900      11.1        45       972        97
VIS    2025250     20200   18.3600  146.2400      11.0        45       941        96
VIS    2025250     20200   18.3700  146.2100      11.0        44       980        95
VIS    2025250     20200   18.3700  145.7800       8.8        64       964        92
VIS    2025250     20200   18.3600  145.7100       9.1        48       932        95
VIS    2025250     20200   18.3600  145.6800       9.4        44       923        98
VIS    2025250     20200   18.3600  145.6700       9.3        45       915        98
VIS    2025250     20200   18.3700  145.6500       8.9        53       931        98
VIS    2025250     20200   18.3600  145.4900       8.7        79       898        90
VIS    2025250     20200   18.3600  145.4500       9.2        91       747        93
VIS    2025250     20200   18.3500  145.4400       9.2        92       747        94
VIS    2025250     20200   18.3700  145.3600       9.1        91       726        96
VIS    2025250     20200   18.3500  145.3300       8.9        88       753        96
VIS    2025250     20200   18.3700  145.3200       8.8        86       774        95
VIS    2025250     20200   18.3700  145.0000      11.4        48       927        90
VIS    2025250     20200   18.3500  144.1300      11.6        76       743        92
VIS    2025250     20200   18.3500  146.4100      11.0        44       933        98
VIS    2025250     20200   18.3500  146.3800      11.1        44       925        97
VIS    2025250     20200   18.3300  146.3600      11.7        45       953        96
VIS    2025250     20200   18.3300  146.3300      11.6        46       946        95
VIS    2025250     20200   18.3500  146.3000      11.1        45       977        97
VIS    2025250     20200   18.3500  146.2800      11.1        45       972        98
VIS    2025250     20200   18.3300  145.6800       9.3        40       908        95
VIS    2025250     20200   18.3400  145.6600       9.0        55       903        95
VIS    2025250     20200   18.3400  145.6400       8.8        57       903        92
VIS    2025250     20200   18.3400  145.4900       8.5        82       898        90
VIS    2025250     20200   18.3400  145.4700       8.6        81       786        97
VIS    2025250     20200   18.3400  145.4500       8.9        85       747        98
VIS    2025250     20200   18.3400  145.3500       9.4        88       718        99
VIS    2025250     20200   18.3300  145.3300       8.7        89       753        96
VIS    2025250     20200   18.3300  145.3100       7.9        87       788        97
VIS    2025250     20200   18.3400  149.2900       7.3        62       984        95
VIS    2025250     20200   18.3400  149.2700       7.4        62       969        99
VIS    2025250     20200   18.3500  149.2500       7.5        62       969        97
VIS    2025250     20200   18.3400  149.2400       7.4        64       936        99
VIS    2025250     20200   18.3400  149.2000       5.7        51       906        92
VIS    2025250     20200   18.3200  146.3700      11.7        44       960        96
VIS    2025250     20200   18.3200  146.3500      11.6        46       960        96
VIS    2025250     20200   18.3200  146.3400      11.6        46       946        96
VIS    2025250     20200   18.3000  145.8200      10.7        43       976        99
VIS    2025250     20200   18.3100  145.4800       7.6        88       794        90
VIS    2025250     20200   18.3000  145.4300       8.4        86       724        93
VIS    2025250     20200   18.3100  145.3500       9.1        80       718        96
VIS    2025250     20200   18.3100  145.3300       8.5        86       780        97
VIS    2025250     20200   18.3100  145.2900       7.9        81       819        98
VIS    2025250     20200   18.3000  144.9900      11.9        49       932        92
VIS    2025250     20200   18.3000  144.8800      11.5        78       711        91
VIS    2025250     20200   18.3200  149.2900       7.7        65       984        98
VIS    2025250     20200   18.3100  149.2700       7.5        61       981        97
VIS    2025250     20200   18.3300  149.2600       7.6        62       969        99
VIS    2025250     20200   18.3200  149.2200       6.9        67       924        98
VIS    2025250     20200   18.3200  149.2000       6.5        63       918        97
VIS    2025250     20200   18.3000  146.3600      11.6        45       960        96
VIS    2025250     20200   18.3000  146.3400      11.5        45       960        96
VIS    2025250     20200   18.2800  146.3200      11.1        45       955        95
VIS    2025250     20200   18.3000  146.2400      10.9        45       968        99
VIS    2025250     20200   18.2900  146.1800      10.7        45       987        94
VIS    2025250     20200   18.2800  145.8400      11.2        40       976        98
VIS    2025250     20200   18.2900  145.8300      11.1        41       976        99
VIS    2025250     20200   18.2800  145.7900       9.7        47       959        98
VIS    2025250     20200   18.2800  145.7600       9.9        49       950        93
VIS    2025250     20200   18.2800  145.7400      10.4        45       949        90
VIS    2025250     20200   18.2800  145.7100      10.1        43       920        92
VIS    2025250     20200   18.2900  145.6800      10.0        42       892        92
VIS    2025250     20200   18.2800  145.6300       9.9        50       856        91
VIS    2025250     20200   18.2800  145.5900       8.5        77       798        98
VIS    2025250     20200   18.2800  145.5800       8.5        84       796        97
VIS    2025250     20200   18.2800  145.5500       8.8       104       752        90
VIS    2025250     20200   18.2900  145.5000       8.3        95       794        90
VIS    2025250     20200   18.2900  145.4800       7.7        88       767        94
VIS    2025250     20200   18.2800  145.4700       7.8        84       744        95
VIS    2025250     20200   18.2800  145.3400       9.2        72       753        97
VIS    2025250     20200   18.2900  145.3200       8.6        81       780        98
VIS    2025250     20200   18.2800  145.0200      12.0        41       970        96
VIS    2025250     20200   18.2800  145.0000      12.2        44       938        98
VIS    2025250     20200   18.2700  144.8900      12.6        80       711        90
VIS    2025250     20200   18.2900  149.2200       7.2        62       939       100
VIS    2025250     20200   18.2900  149.2200       7.0        63       939        99
VIS    2025250     20200   18.2900  149.1900       5.8        50       918        92
VIS    2025250     20200   18.2700  146.7000      10.4        46       980        96
VIS    2025250     20200   18.2700  146.6900      10.2        46       980        95
VIS    2025250     20200   18.2600  146.6400       9.8        44       988        93
VIS    2025250     20200   18.2700  146.3600      11.2        44       960        98
VIS    2025250     20200   18.2600  146.3400      10.8        44       970        99
VIS    2025250     20200   18.2700  146.3300      11.0        45       957        96
VIS    2025250     20200   18.2600  146.2800      10.9        44       955        99
VIS    2025250     20200   18.2800  146.2600      10.8        43       965        98
VIS    2025250     20200   18.2600  146.1400      10.6        45       991        97
VIS    2025250     20200   18.2800  146.1000      11.0        44       978        98
VIS    2025250     20200   18.2500  145.9300      10.2        43       980        92
VIS    2025250     20200   18.2500  145.9000      10.5        44       980        95
VIS    2025250     20200   18.2500  145.8900      10.5        45       979        95
VIS    2025250     20200   18.2500  145.8500      11.0        42       974       100
VIS    2025250     20200   18.2600  145.8500      11.1        41       974       100
VIS    2025250     20200   18.2600  145.8000      10.3        44       948        99
VIS    2025250     20200   18.2700  145.7900       9.9        46       959        99
VIS    2025250     20200   18.2500  145.7600      10.5        44       920        96
VIS    2025250     20200   18.2600  145.7400      10.6        43       920        93
VIS    2025250     20200   18.2500  145.7100      10.8        41       908        96
VIS    2025250     20200   18.2600  145.6900      10.8        43       908        97
VIS    2025250     20200   18.2600  145.6600      10.6        44       883        94
VIS    2025250     20200   18.2700  145.6500      10.1        46       873        93
VIS    2025250     20200   18.2600  145.6300       9.0        56       856        96
VIS    2025250     20200   18.2500  145.6000       8.3        92       791        95
VIS    2025250     20200   18.2500  145.5800       8.7        96       707        99
VIS    2025250     20200   18.2600  145.5500       8.6        99       705        98
VIS    2025250     20200   18.2600  145.5200       9.0        97       719        91
VIS    2025250     20200   18.2700  145.4900       8.3        89       754        97
VIS    2025250     20200   18.2700  145.4700       7.9        84       744        96
VIS    2025250     20200   18.2700  145.4500       8.5        82       742        90
VIS    2025250     20200   18.2700  144.8900      12.1        80       711        91
VIS    2025250     20200   18.2800  149.1800       6.2        48       921        93
VIS    2025250     20200   18.2400  146.7100      10.6        45       980        97
VIS    2025250     20200   18.2400  146.6900      10.3        45       980        97
VIS    2025250     20200   18.2400  146.6200      10.0        42       983        99
VIS    2025250     20200   18.2500  146.3400      10.8        44       970        99
VIS    2025250     20200   18.2500  146.3100      10.8        44       955        99
VIS    2025250     20200   18.2500  146.2900      10.8        44       955        99
VIS    2025250     20200   18.2500  146.2600      11.0        43       965        98
VIS    2025250     20200   18.2300  146.2200      10.8        43       947        99
VIS    2025250     20200   18.2500  146.1800      10.4        44       947        95
VIS    2025250     20200   18.2300  146.1500      10.8        44       984        98
VIS    2025250     20200   18.2500  146.1200      10.7        44       978        98
VIS    2025250     20200   18.2500  146.1200      10.7        44       978        99
VIS    2025250     20200   18.2500  146.0800      11.3        41       985        98
VIS    2025250     20200   18.2500  146.0700      11.5        41       985        98
VIS    2025250     20200   18.2300  146.0300      10.5        46       992        93
VIS    2025250     20200   18.2400  145.9000      10.8        45       980        93
VIS    2025250     20200   18.2400  145.9000      10.8        45       980        93
VIS    2025250     20200   18.2400  145.8500      10.7        42       974        99
VIS    2025250     20200   18.2400  145.8500      10.7        41       974        99
VIS    2025250     20200   18.2500  145.8100      10.6        42       947        99
VIS    2025250     20200   18.2400  145.7800      10.5        46       921        96
VIS    2025250     20200   18.2300  145.7600      10.7        44       914        97
VIS    2025250     20200   18.2300  145.7500      10.7        43       913        98
VIS    2025250     20200   18.2500  145.7100      10.9        41       901        95
VIS    2025250     20200   18.2500  145.7000      10.8        43       901        98
VIS    2025250     20200   18.2500  145.6800      10.6        44       879        95
VIS    2025250     20200   18.2300  145.6500       9.7        45       873        96
VIS    2025250     20200   18.2400  145.6300       8.4        60       856        97
VIS    2025250     20200   18.2500  145.5900       8.5        95       761        94
VIS    2025250     20200   18.2300  145.5800       8.9        97       702        94
VIS    2025250     20200   18.2500  145.5500       8.5        97       704        99
VIS    2025250     20200   18.2400  145.4900       9.1        87       712        99
VIS    2025250     20200   18.2400  145.4600       8.8        87       729        94
VIS    2025250     20200   18.2400  145.4300       8.6        82       707        92
VIS    2025250     20200   18.2400  145.3200      10.0        86       753        90
VIS    2025250     20200   18.2100  146.7700      10.5        46       973        96
VIS    2025250     20200   18.2300  146.4200      10.7        44       981        91
VIS    2025250     20200   18.2100  146.3800      10.0        45       981        98
VIS    2025250     20200   18.2100  146.3700      10.2        45       983        98
VIS    2025250     20200   18.2100  146.3100      10.8        44       972        97
VIS    2025250     20200   18.2100  146.3000      11.0        45       972        97
VIS    2025250     20200   18.2100  146.2600      10.9        44       973        98
VIS    2025250     20200   18.2100  146.2300      10.8        42       960        98
VIS    2025250     20200   18.2200  146.2200      10.9        43       947        99
VIS    2025250     20200   18.2200  146.2100      11.1        44       929        99
VIS    2025250     20200   18.2100  146.1600      10.5        45       960        97
VIS    2025250     20200   18.2300  146.1500      10.8        44       984        98
VIS    2025250     20200   18.2100  146.1300      10.5        41       975        99
VIS    2025250     20200   18.2100  146.1000      11.0        40       980        99
VIS    2025250     20200   18.2300  146.0400       9.9        47       992        90
VIS    2025250     20200   18.2300  145.9200      10.5        45       980        92
VIS    2025250     20200   18.2100  145.8900      10.3        48       950        97
VIS    2025250     20200   18.2200  145.8700      10.3        48       966        97
VIS    2025250     20200   18.2200  145.8600      10.2        47       966        98
VIS    2025250     20200   18.2200  145.8300      10.0        40       930        99
VIS    2025250     20200   18.2100  145.8000      10.8        42       919        96
VIS    2025250     20200   18.2100  145.7800      11.1        44       913        95
VIS    2025250     20200   18.2100  145.7600      10.6        45       911        97
VIS    2025250     20200   18.2200  145.7400      10.6        44       911        98
VIS    2025250     20200   18.2100  145.7000       9.9        49       864        94
VIS    2025250     20200   18.2200  145.6800      10.0        44       873        95
VIS    2025250     20200   18.2200  145.6500       9.1        47       867        96
VIS    2025250     20200   18.2000  145.6300       8.2        62       854        95
VIS    2025250     20200   18.2000  145.6200       7.7        75       761        97
VIS    2025250     20200   18.2200  145.4600       8.9        93       717        91
VIS    2025250     20200   18.2200  145.4200       8.6        85       707        92
VIS    2025250     20200   18.2000  145.3600       8.2        90       701        90
VIS    2025250     20200   18.2100  146.6500      10.4        43       970        98
VIS    2025250     20200   18.2000  146.5300      10.1        41       963       100
VIS    2025250     20200   18.2000  146.3700      10.2        45       981        98
VIS    2025250     20200   18.1900  146.3400      10.6        45       973        97
VIS    2025250     20200   18.2000  146.3200      10.8        45       972        97
VIS    2025250     20200   18.2000  146.3200      10.8        44       972        97
VIS    2025250     20200   18.2000  146.2900      11.1        45       972        96
VIS    2025250     20200   18.1800  146.2500      10.4        43       979        98
VIS    2025250     20200   18.1900  146.2300      10.6        43       967        99
VIS    2025250     20200   18.1900  146.2200      10.9        44       960        99
VIS    2025250     20200   18.1800  146.1800      10.7        46       958        97
VIS    2025250     20200   18.2000  146.1500      10.1        45       960        98
VIS    2025250     20200   18.2000  146.1500      10.0        45       960        99
VIS    2025250     20200   18.1900  146.1100       9.6        44       958        98
VIS    2025250     20200   18.2000  146.1000      10.4        41       980        99
VIS    2025250     20200   18.1900  146.0600      10.2        42       969        99
VIS    2025250     20200   18.1800  146.0300      10.4        45       968        96
VIS    2025250     20200   18.1800  146.0200      10.3        45       966        95
VIS    2025250     20200   18.1900  145.9900       9.8        43       963        94
VIS    2025250     20200   18.1900  145.9600       9.4        46       948        93
VIS    2025250     20200   18.1900  145.9300      10.0        47       948        94
VIS    2025250     20200   18.2000  145.9300      10.2        46       950        94
VIS    2025250     20200   18.2000  145.9000      10.2        48       939        98
VIS    2025250     20200   18.2000  145.8800      10.2        48       939        98
VIS    2025250     20200   18.1900  145.8400      10.4        36       915        98
VIS    2025250     20200   18.1900  145.8200      10.9        38       912        96
VIS    2025250     20200   18.1800  145.8000      11.1        41       911        96
VIS    2025250     20200   18.2000  145.7800      10.8        45       911        95
VIS    2025250     20200   18.1800  145.7300       9.5        50       907        90
VIS    2025250     20200   18.1900  145.7300       9.6        50       860        90
VIS    2025250     20200   18.1900  145.6600       9.8        40       865        91
VIS    2025250     20200   18.1900  145.6500       9.2        45       865        94
VIS    2025250     20200   18.2000  145.6200       7.9        68       821        96
VIS    2025250     20200   18.1800  145.6100       7.7        85       731        97
VIS    2025250     20200   18.1800  145.3600       7.8        92       715        92
VIS    2025250     20200   18.1800  146.3900       9.7        44       981        99
VIS    2025250     20200   18.1700  146.3300      10.5        45       972        98
VIS    2025250     20200   18.1800  146.3200      10.7        44       970        98
VIS    2025250     20200   18.1600  146.2500      10.1        41       979        99
VIS    2025250     20200   18.1600  146.2300      10.2        42       981        99
VIS    2025250     20200   18.1700  146.2000      10.7        44       960        98
VIS    2025250     20200   18.1700  146.1800      10.3        45       958        97
VIS    2025250     20200   18.1600  146.1700      10.0        45       954        97
VIS    2025250     20200   18.1700  146.1300       8.7        45       943        97
VIS    2025250     20200   18.1600  146.0800       9.3        49       935        94
VIS    2025250     20200   18.1800  146.0600      10.1        45       955        97
VIS    2025250     20200   18.1800  146.0500      10.3        44       966        95
VIS    2025250     20200   18.1800  146.0200      10.3        45       966        96
VIS    2025250     20200   18.1800  146.0000      10.2        44       963        97
VIS    2025250     20200   18.1600  145.9600       9.2        47       935        97
VIS    2025250     20200   18.1700  145.9400       9.5        47       932        97
VIS    2025250     20200   18.1600  145.9200       9.7        48       919        99
VIS    2025250     20200   18.1800  145.9000       9.9        46       923        99
VIS    2025250     20200   18.1800  145.8800      10.1        44       916        99
VIS    2025250     20200   18.1600  145.8400      10.5        36       911        95
VIS    2025250     20200   18.1600  145.8200      10.7        36       911        97
VIS    2025250     20200   18.1600  145.7900      10.9        41       909        98
VIS    2025250     20200   18.1600  145.7600      10.3        45       909        96
VIS    2025250     20200   18.1700  145.7500       9.9        47       909        94
VIS    2025250     20200   18.1500  145.6500       9.6        40       865        91
VIS    2025250     20200   18.1600  145.6300       7.9        56       854        94
VIS    2025250     20200   18.1600  145.6100       7.4        81       777        94
VIS    2025250     20200   18.1700  145.4000       7.9        96       710        95
VIS    2025250     20200   18.1600  145.3900       7.6        94       732        91
VIS    2025250     20200   18.1400  146.5500      10.6        46       990        96
VIS    2025250     20200   18.1400  146.5100      10.2        46       983        95
VIS    2025250     20200   18.1500  146.4800      10.4        46       987        93
VIS    2025250     20200   18.1400  146.4800      10.4        46       987        91
VIS    2025250     20200   18.1400  146.3300      10.4        44       977        98
VIS    2025250     20200   18.1500  146.2400      10.1        41       979        99
VIS    2025250     20200   18.1400  146.1900      10.5        43       981        97
VIS    2025250     20200   18.1400  146.1900      10.4        43       963        97
VIS    2025250     20200   18.1500  146.1600       9.5        44       935        97
VIS    2025250     20200   18.1300  146.1300       9.3        43       932        96
VIS    2025250     20200   18.1500  146.0800       9.1        53       932        90
VIS    2025250     20200   18.1400  146.0400      10.3        45       942        98
VIS    2025250     20200   18.1500  146.0400      10.5        44       955        98
VIS    2025250     20200   18.1500  146.0200      10.3        43       963        97
VIS    2025250     20200   18.1400  145.9900       9.4        40       940        97
VIS    2025250     20200   18.1500  145.9500       9.1        48       929        98
VIS    2025250     20200   18.1400  145.9400       9.1        48       919        99
VIS    2025250     20200   18.1500  145.9200       9.8        48       916        99
VIS    2025250     20200   18.1400  145.8700      10.2        42       909        93
VIS    2025250     20200   18.1300  145.8700      10.2        43       908        93
VIS    2025250     20200   18.1400  145.8200      10.2        39       910        97
VIS    2025250     20200   18.1500  145.8200      10.5        37       910        98
VIS    2025250     20200   18.1400  145.7900      10.5        40       909        99
VIS    2025250     20200   18.1500  145.7700      10.2        42       908        99
VIS    2025250     20200   18.1500  145.7300       9.0        49       852        94
VIS    2025250     20200   18.1500  145.7200       9.1        46       852        93
VIS    2025250     20200   18.1300  145.6700      10.0        38       859        90
VIS    2025250     20200   18.1400  145.6500       9.7        39       867        91
VIS    2025250     20200   18.1300  145.3900       7.3        78       769        92
VIS    2025250     20200   18.1200  145.0700      10.3        83       869        90
VIS    2025250     20200   18.1400  144.8800       9.6        59       725        90
VIS    2025250     20200   18.1200  144.8700       9.6        65       725        92
VIS    2025250     20200   18.1500  149.7800       8.1        76       980        99
VIS    2025250     20200   18.1500  149.7600       8.0        76       980        99
VIS    2025250     20200   18.1500  149.5900       6.9        61       977        98
VIS    2025250     20200   18.1200  146.5400      10.7        45       975        96
VIS    2025250     20200   18.1100  146.4800      10.0        44       975        95
VIS    2025250     20200   18.1300  146.3700      10.7        44       978        91
VIS    2025250     20200   18.1300  146.3400      10.3        44       977        98
VIS    2025250     20200   18.1300  146.3300      10.3        44       977        98
VIS    2025250     20200   18.1100  146.3000      10.7        46       971        98
VIS    2025250     20200   18.1300  146.2700      10.5        43       970        99
VIS    2025250     20200   18.1200  146.2400      10.3        42       973        99
VIS    2025250     20200   18.1200  146.2300      10.3        41       979        99
VIS    2025250     20200   18.1200  146.1900      10.6        42       981        96
VIS    2025250     20200   18.1100  146.1800      10.5        43       954        98
VIS    2025250     20200   18.1100  146.1500      10.3        42       937        97
VIS    2025250     20200   18.1100  146.1100       9.2        43       942        97
VIS    2025250     20200   18.1100  146.1100       8.7        47       942        97
VIS    2025250     20200   18.1200  146.0800       8.8        52       920        94
VIS    2025250     20200   18.1100  146.0400       9.9        45       914        99
VIS    2025250     20200   18.1300  146.0200       9.9        44       931        98
VIS    2025250     20200   18.1100  146.0000       9.4        41       913        96
VIS    2025250     20200   18.1100  145.9900       9.2        39       913        96
VIS    2025250     20200   18.1100  145.9400       9.3        42       911        98
VIS    2025250     20200   18.1100  145.9300       9.5        42       909        98
VIS    2025250     20200   18.1100  145.9100       9.5        45       907       100
VIS    2025250     20200   18.1100  145.8700      10.0        46       907        99
VIS    2025250     20200   18.1300  145.8700      10.3        43       908        94
VIS    2025250     20200   18.1200  145.8300       9.7        44       910        98
VIS    2025250     20200   18.1200  145.8200       9.6        42       910        98
VIS    2025250     20200   18.1100  145.7800       9.6        48       907        97
VIS    2025250     20200   18.1200  145.7600       9.8        45       905        98
VIS    2025250     20200   18.1100  145.7400       9.6        49       847        94
VIS    2025250     20200   18.1200  145.7000       9.7        42       854        92
VIS    2025250     20200   18.1100  145.6800       9.7        37       859        90
VIS    2025250     20200   18.1100  145.6700      10.0        36       860        90
VIS    2025250     20200   18.1100  145.6400      10.2        37       879        92
VIS    2025250     20200   18.1100  145.6100       8.9        44       867        94
VIS    2025250     20200   18.1000  145.3900       8.1        74       769        97
VIS    2025250     20200   18.1100  145.1200      11.5        50       951        90
VIS    2025250     20200   18.1200  145.0900      11.0        66       881        93
VIS    2025250     20200   18.1000  145.0700      10.9        79       758        93
VIS    2025250     20200   18.1000  145.0600      10.8        80       758        93
VIS    2025250     20200   18.1200  144.8800       9.5        68       716        93
VIS    2025250     20200   18.1200  144.8700       9.5        66       716        92
VIS    2025250     20200   18.1400  149.7700       8.1        75       980        99
VIS    2025250     20200   18.1200  149.7400       7.8        71       980        95
VIS    2025250     20200   18.1300  149.7300       7.8        75       980        91
VIS    2025250     20200   18.1400  149.6100       6.7        62       978        95
VIS    2025250     20200   18.1400  149.5900       7.0        61       977        93
VIS    2025250     20200   18.1200  149.3400       8.0        65       991        90
VIS    2025250     20200   18.1200  149.3300       8.1        66       991        90
VIS    2025250     20200   18.1000  146.7600      11.3        44       988        97
VIS    2025250     20200   18.0900  146.5600      10.5        46       986        97
VIS    2025250     20200   18.0900  146.3700      10.7        53       957        96
VIS    2025250     20200   18.1000  146.3600      10.8        49       966        97
VIS    2025250     20200   18.1100  146.3200      10.8        46       970        97
VIS    2025250     20200   18.0900  146.3000      10.6        47       970        97
VIS    2025250     20200   18.0900  146.2800      10.5        45       970        97
VIS    2025250     20200   18.1000  146.2300      10.4        42       975        99
VIS    2025250     20200   18.0900  146.2200      10.2        43       975        98
VIS    2025250     20200   18.0900  146.1800      10.4        44       957        98
VIS    2025250     20200   18.1000  146.1500      10.3        42       937        98
VIS    2025250     20200   18.0800  146.1300       9.8        43       942        94
VIS    2025250     20200   18.1000  146.1100       9.0        44       943        97
VIS    2025250     20200   18.1000  146.0900       8.6        49       930        97
VIS    2025250     20200   18.1000  146.0500       9.6        47       910       100
VIS    2025250     20200   18.1000  146.0400       9.9        45       909        99
VIS    2025250     20200   18.0900  146.0200       9.9        43       907        98
VIS    2025250     20200   18.1000  145.9900       9.5        41       910        98
VIS    2025250     20200   18.0900  145.9700       9.8        42       910        96
VIS    2025250     20200   18.1000  145.9500       9.4        41       910        96
VIS    2025250     20200   18.0900  145.9100      10.0        41       906        97
VIS    2025250     20200   18.0800  145.8900      10.1        41       906        98
VIS    2025250     20200   18.1000  145.8600      10.1        48       908        98
VIS    2025250     20200   18.0900  145.8300       9.5        48       909       100
VIS    2025250     20200   18.1000  145.8300       9.5        46       909       100
VIS    2025250     20200   18.1000  145.8000       9.3        46       908        96
VIS    2025250     20200   18.0900  145.7700       9.9        50       906        99
VIS    2025250     20200   18.0900  145.7500       9.7        50       857        94
VIS    2025250     20200   18.0800  145.7100       9.8        42       844        90
VIS    2025250     20200   18.1000  145.6400      10.1        36       881        92
VIS    2025250     20200   18.1000  145.6200       9.9        37       883        94
VIS    2025250     20200   18.1000  145.5900       7.0        76       725       100
VIS    2025250     20200   18.0800  145.4100       7.9        84       702        98
VIS    2025250     20200   18.0900  145.3900       8.3        79       754        91
VIS    2025250     20200   18.0900  145.1200      11.7        49       945        92
VIS    2025250     20200   18.0800  145.0800      10.9        66       811        94
VIS    2025250     20200   18.0800  145.0500      10.6        75       723        93
VIS    2025250     20200   18.0900  144.9300      10.9        66       746        91
VIS    2025250     20200   18.0900  144.8800       9.5        70       746        96
VIS    2025250     20200   18.0900  144.8800       9.4        69       746        96
VIS    2025250     20200   18.1000  149.7400       7.3        66       960        97
VIS    2025250     20200   18.1100  149.7300       7.5        69       967        94
VIS    2025250     20200   18.0900  149.3500       8.2        61       980        94
VIS    2025250     20200   18.1000  149.3200       8.2        63       980        96
VIS    2025250     20200   18.1000  149.3200       8.2        64       980        91
VIS    2025250     20200   18.0800  146.7500      11.3        44       988        96
VIS    2025250     20200   18.0700  146.5800       9.6        47       985        98
VIS    2025250     20200   18.0600  146.5500      10.1        46       986        98
VIS    2025250     20200   18.0600  146.5300      10.5        45       985        96
VIS    2025250     20200   18.0600  146.5100      10.7        46       981        94
VIS    2025250     20200   18.0600  146.3700      10.7        52       955        96
VIS    2025250     20200   18.0600  146.3400      10.8        49       942        98
VIS    2025250     20200   18.0600  146.3300      10.8        48       942        98
VIS    2025250     20200   18.0600  146.2900      10.2        44       956        98
VIS    2025250     20200   18.0800  146.2400      10.2        41       973        99
VIS    2025250     20200   18.0800  146.2200      10.2        43       973        98
VIS    2025250     20200   18.0700  146.1900      10.2        44       969        98
VIS    2025250     20200   18.0800  146.1800      10.2        45       957        98
VIS    2025250     20200   18.0800  146.1400       9.9        44       942        95
VIS    2025250     20200   18.0600  146.1300       9.7        43       942        96
VIS    2025250     20200   18.0600  146.1100       9.7        43       927        97
VIS    2025250     20200   18.0600  146.0900       9.3        45       927        97
VIS    2025250     20200   18.0700  146.0500       9.7        48       910       100
VIS    2025250     20200   18.0600  146.0400      10.0        46       906       100
VIS    2025250     20200   18.0600  146.0100      10.1        42       903        98
VIS    2025250     20200   18.0600  145.9800      10.0        42       904        97
VIS    2025250     20200   18.0600  145.9600      10.1        44       905        99
VIS    2025250     20200   18.0600  145.9000      10.2        41       906        97
VIS    2025250     20200   18.0600  145.8900      10.0        40       906        97
VIS    2025250     20200   18.0600  145.8500       8.7        45       908        99
VIS    2025250     20200   18.0800  145.8400       9.3        47       908        98
VIS    2025250     20200   18.0700  145.8100       9.7        48       907        99
VIS    2025250     20200   18.0800  145.7800      10.0        49       907        98
VIS    2025250     20200   18.0700  145.7600      10.1        50       906        96
VIS    2025250     20200   18.0800  145.6200       9.3        34       909        95
VIS    2025250     20200   18.0600  145.3700       8.8        82       795        92
VIS    2025250     20200   18.0600  145.1200      11.4        47       910        99
VIS    2025250     20200   18.0700  145.0700      10.4        74       787        93
VIS    2025250     20200   18.0500  144.9400      10.4        59       748        90
VIS    2025250     20200   18.0500  144.9000      10.3        62       791        94
VIS    2025250     20200   18.0600  144.8800       9.6        69       712        93
VIS    2025250     20200   18.0700  149.8100       7.8        71       998        93
VIS    2025250     20200   18.0700  149.7800       6.9        64       972        99
VIS    2025250     20200   18.0800  149.7600       7.1        61       960        97
VIS    2025250     20200   18.0900  149.7400       7.2        65       960        97
VIS    2025250     20200   18.0700  149.5000       7.0        65       951        90
VIS    2025250     20200   18.0800  149.3400       8.1        61       980        98
VIS    2025250     20200   18.0700  149.3200       7.9        61       958        96
VIS    2025250     20200   18.0800  149.2300       6.7        65       982        96
VIS    2025250     20200   18.0400  146.7700      10.5        42       977        99
VIS    2025250     20200   18.0400  146.7500      10.8        41       977        96
VIS    2025250     20200   18.0500  146.5600      10.1        46       986        96
VIS    2025250     20200   18.0600  146.5500      10.2        46       986        98
VIS    2025250     20200   18.0500  146.5200      10.8        46       981        97
VIS    2025250     20200   18.0500  146.5100      10.8        46       981        96
VIS    2025250     20200   18.0600  146.3700      10.7        52       955        96
VIS    2025250     20200   18.0600  146.3400      10.7        50       942        98
VIS    2025250     20200   18.0600  146.3300      10.7        49       936        98
VIS    2025250     20200   18.0500  146.3000      10.3        47       931       100
VIS    2025250     20200   18.0400  146.2700       9.9        41       931        98
VIS    2025250     20200   18.0500  146.2400      10.2        40       939        98
VIS    2025250     20200   18.0500  146.2300      10.2        42       959        98
VIS    2025250     20200   18.0400  146.2000      10.3        43       957        99
VIS    2025250     20200   18.0500  146.1700       9.8        44       957        98
VIS    2025250     20200   18.0500  146.1500       9.7        43       953        98
VIS    2025250     20200   18.0500  146.1100       9.7        42       927        98
VIS    2025250     20200   18.0400  146.1000       9.9        42       922        99
VIS    2025250     20200   18.0300  146.0700      10.0        46       919        97
VIS    2025250     20200   18.0400  146.0500      10.1        47       914       100
VIS    2025250     20200   18.0400  146.0200      10.2        44       906        99
VIS    2025250     20200   18.0400  146.0100      10.3        42       902        98
VIS    2025250     20200   18.0500  145.9800      10.3        41       903        97
VIS    2025250     20200   18.0500  145.9600      10.2        42       904        98
VIS    2025250     20200   18.0300  145.9200      10.2        42       904        98
VIS    2025250     20200   18.0500  145.8900      10.0        40       906        98
VIS    2025250     20200   18.0400  145.8900       9.8        40       906        99
VIS    2025250     20200   18.0400  145.8600       8.6        42       913        98
VIS    2025250     20200   18.0400  145.8300       8.7        49       904        99
VIS    2025250     20200   18.0500  145.8000      10.1        48       903        99
VIS    2025250     20200   18.0500  145.7800      10.3        46       904        98
VIS    2025250     20200   18.0300  145.7400      10.7        39       899        94
VIS    2025250     20200   18.0400  145.6700       8.9        33       868        90
VIS    2025250     20200   18.0500  145.6400       9.8        32       909        93
VIS    2025250     20200   18.0400  145.6200      10.5        33       933        98
VIS    2025250     20200   18.0400  145.3800       8.2        81       754        94
VIS    2025250     20200   18.0300  145.3100       9.7        90       854        92
VIS    2025250     20200   18.0400  145.1300      10.2        45       912        91
VIS    2025250     20200   18.0400  144.9400      10.2        63       711        90
VIS    2025250     20200   18.0300  144.9100       9.9        70       773        92
VIS    2025250     20200   18.0300  144.8900       9.6        74       773        92
VIS    2025250     20200   18.0700  149.8100       8.0        71       998        95
VIS    2025250     20200   18.0700  149.7900       7.3        67       972        98
VIS    2025250     20200   18.0600  149.7700       7.3        62       968        99
VIS    2025250     20200   18.0500  149.5300       7.0        63       959        95
VIS    2025250     20200   18.0700  149.5000       7.0        67       953        92
VIS    2025250     20200   18.0600  149.5000       7.0        66       951        96
VIS    2025250     20200   18.0500  149.4600       7.4        60       961        91
VIS    2025250     20200   18.0600  149.3100       8.0        58       946        90
VIS    2025250     20200   18.0300  147.2600       8.5        47       993        99
VIS    2025250     20200   18.0200  147.1900       9.5        48       982        96
VIS    2025250     20200   18.0300  147.1800       9.6        48       983        95
VIS    2025250     20200   18.0200  146.8400      10.5        42       982        96
VIS    2025250     20200   18.0400  146.8100      10.2        43       983        98
VIS    2025250     20200   18.0400  146.7900      10.3        42       980        99
VIS    2025250     20200   18.0400  146.7400      10.8        41       977        97
VIS    2025250     20200   18.0300  146.5500      10.2        46       985        93
VIS    2025250     20200   18.0300  146.5500      10.4        46       985        92
VIS    2025250     20200   18.0300  146.5100      10.9        46       981        96
VIS    2025250     20200   18.0300  146.3700      10.6        50       959        96
VIS    2025250     20200   18.0300  146.3700      10.6        49       955        97
VIS    2025250     20200   18.0200  146.3400      10.2        47       939        99
VIS    2025250     20200   18.0300  146.3100      10.3        48       931        99
VIS    2025250     20200   18.0100  146.2900      10.1        45       930       100
VIS    2025250     20200   18.0300  146.2600      10.2        42       927        99
VIS    2025250     20200   18.0300  146.2400      10.5        42       927       100
VIS    2025250     20200   18.0200  146.2200      10.5        41       929       100
VIS    2025250     20200   18.0100  146.1900      10.4        44       939        99
VIS    2025250     20200   18.0200  146.1500      10.2        44       939        98
VIS    2025250     20200   18.0200  146.1400      10.0        43       930        99
VIS    2025250     20200   18.0200  146.1200       9.9        42       923       100
VIS    2025250     20200   18.0300  146.1000      10.0        43       921        99
VIS    2025250     20200   18.0300  146.0600      10.1        45       916        98
VIS    2025250     20200   18.0300  146.0400      10.0        46       914       100
VIS    2025250     20200   18.0100  146.0300      10.0        43       912       100
VIS    2025250     20200   18.0200  146.0000      10.5        41       902        97
VIS    2025250     20200   18.0200  145.9600      10.6        39       903        97
VIS    2025250     20200   18.0200  145.9500      10.5        40       904        98
VIS    2025250     20200   18.0100  145.9200      10.2        42       905        94
VIS    2025250     20200   18.0200  145.8900       9.6        41       910        98
VIS    2025250     20200   18.0200  145.8800       9.5        39       915        98
VIS    2025250     20200   18.0300  145.8500       8.5        43       913        98
VIS    2025250     20200   18.0100  145.8200       8.7        53       899        98
VIS    2025250     20200   18.0100  145.8000       8.9        51       899        97
VIS    2025250     20200   18.0100  145.7600       9.5        43       900        95
VIS    2025250     20200   18.0300  145.7100       9.1        38       856        90
VIS    2025250     20200   18.0300  145.6500       9.5        33       912        96
VIS    2025250     20200   18.0300  145.6300      10.0        35       933        96
VIS    2025250     20200   18.0300  145.6000      11.3        34       988        99
VIS    2025250     20200   18.0200  145.3100       9.5        85       854        94
VIS    2025250     20200   18.0100  145.2900       8.9        79       777        95
VIS    2025250     20200   18.0100  145.0800      10.6        69       783        90
VIS    2025250     20200   18.0200  145.0600       9.6        78       718        92
VIS    2025250     20200   18.0400  149.5500       7.6        64       974        94
VIS    2025250     20200   18.0400  149.5300       7.3        63       959        95
VIS    2025250     20200   18.0400  149.5100       7.0        65       957        99
VIS    2025250     20200   18.0300  149.2500       7.6        69       922        96
VIS    2025250     20200   18.0200  149.2200       7.5        72       932        94
VIS    2025250     20200   18.0200  149.2100       7.5        72       945        94
VIS    2025250     20200   18.0100  147.2400       8.9        45       983        99
VIS    2025250     20200   18.0000  147.2200       9.0        44       983        99
VIS    2025250     20200   18.0100  147.1900       9.6        49       982        95
VIS    2025250     20200   18.0000  147.1800       9.5        48       980        94
VIS    2025250     20200   18.0100  147.1600       9.8        49       982        95
VIS    2025250     20200   18.0000  147.0100       9.7        42       990       100
VIS    2025250     20200   17.9900  146.7300      10.5        40       968        98
VIS    2025250     20200   18.0000  146.7000      10.7        42       968        98
VIS    2025250     20200   17.9900  146.3400       9.9        46       956        97
VIS    2025250     20200   17.9900  146.3200       9.8        44       939        98
VIS    2025250     20200   17.9900  146.3000      10.2        43       938        99
VIS    2025250     20200   18.0000  146.2700      10.7        42       930        99
VIS    2025250     20200   17.9900  146.2400      10.7        40       930       100
VIS    2025250     20200   18.0100  146.2400      10.8        41       929       100
VIS    2025250     20200   18.0000  146.2000      10.6        43       934       100
VIS    2025250     20200   17.9900  146.1700      10.9        46       933        97
VIS    2025250     20200   18.0100  146.1400      10.3        45       930        98
VIS    2025250     20200   18.0000  146.1200      10.3        44       920       100
VIS    2025250     20200   17.9900  146.1100      10.4        44       919       100
VIS    2025250     20200   18.0100  146.0800      10.2        43       912        99
VIS    2025250     20200   17.9900  146.0400       9.7        44       909        99
VIS    2025250     20200   18.0000  146.0200      10.1        42       905        99
VIS    2025250     20200   18.0000  146.0200      10.1        42       905        99
VIS    2025250     20200   18.0000  145.9800      10.2        40       904        98
VIS    2025250     20200   17.9800  145.9500      10.5        39       911        96
VIS    2025250     20200   17.9800  145.9400      10.5        39       910        96
VIS    2025250     20200   17.9900  145.9200      10.2        41       909        94
VIS    2025250     20200   18.0000  145.8700       9.9        37       915        97
VIS    2025250     20200   17.9900  145.8600      10.1        37       910        96
VIS    2025250     20200   18.0000  145.8400       8.9        48       904        97
VIS    2025250     20200   18.0000  145.8100       8.8        51       901        95
VIS    2025250     20200   18.0000  145.7900       8.9        47       902        96
VIS    2025250     20200   17.9800  145.7500       9.3        43       899        98
VIS    2025250     20200   18.0000  145.7500       9.6        43       899        98
VIS    2025250     20200   17.9900  145.6200      10.9        32       988        97
VIS    2025250     20200   18.0000  145.6000      11.5        33       988        98
VIS    2025250     20200   17.9800  145.3000       8.3        88       817        92
VIS    2025250     20200   17.9800  145.2800       8.1        85       795        92
VIS    2025250     20200   17.9900  145.0700      10.9        71       782        94
VIS    2025250     20200   17.9800  145.0500      10.1        72       716        92
VIS    2025250     20200   18.0100  149.8000       8.5        64       987        99
VIS    2025250     20200   17.9900  149.1800       7.8        68       991        94
VIS    2025250     20200   18.0000  149.1500       7.7        61       979        90
VIS    2025250     20200   18.0000  149.1500       7.8        62       979        92
VIS    2025250     20200   17.9800  147.2500       9.5        46       983        97
VIS    2025250     20200   17.9900  147.2200       9.1        44       983        98
VIS    2025250     20200   17.9700  147.2000       9.5        47       976        96
VIS    2025250     20200   17.9800  147.1700       9.6        47       973        94
VIS    2025250     20200   17.9800  147.1700       9.6        47       973        95
VIS    2025250     20200   17.9800  146.7700      10.2        40       976        99
VIS    2025250     20200   17.9900  146.7400      10.4        40       968        99
VIS    2025250     20200   17.9700  146.7200      10.6        39       968        99
VIS    2025250     20200   17.9700  146.3600      10.1        45       956        97
VIS    2025250     20200   17.9800  146.3200       9.9        44       947        99
VIS    2025250     20200   17.9800  146.3000      10.1        44       938        99
VIS    2025250     20200   17.9800  146.2700      10.7        41       933        99
VIS    2025250     20200   17.9800  146.2600      10.7        40       933        99
VIS    2025250     20200   17.9800  146.2300      10.7        39       938       100
VIS    2025250     20200   17.9700  146.2000      10.9        44       957        98
VIS    2025250     20200   17.9700  146.1700      11.2        46       934        97
VIS    2025250     20200   17.9800  146.1600      11.2        46       930        98
VIS    2025250     20200   17.9700  146.1400      11.2        46       919        98
VIS    2025250     20200   17.9600  146.1200      11.0        44       915        99
VIS    2025250     20200   17.9700  146.0900      10.7        44       912        99
VIS    2025250     20200   17.9800  146.0700      10.4        44       908        99
VIS    2025250     20200   17.9700  146.0300      10.4        40       905        98
VIS    2025250     20200   17.9700  146.0200      10.5        40       904        98
VIS    2025250     20200   17.9800  145.9900      10.3        40       904        97
VIS    2025250     20200   17.9800  145.9500      10.5        40       911        96
VIS    2025250     20200   17.9700  145.9300      10.5        40       911        98
VIS    2025250     20200   17.9600  145.9100      10.3        40       910        99
VIS    2025250     20200   17.9700  145.8900      10.1        39       910        97
VIS    2025250     20200   17.9600  145.8500      10.3        40       903        96
VIS    2025250     20200   17.9700  145.8500      10.3        40       903        96
VIS    2025250     20200   17.9600  145.8200      10.5        39       902        97
VIS    2025250     20200   17.9600  145.7800      10.3        39       902        98
VIS    2025250     20200   17.9600  145.7500       9.8        40       902        98
VIS    2025250     20200   17.9800  145.7500       9.3        42       899        97
VIS    2025250     20200   17.9600  145.3500       6.9        97       731        90
VIS    2025250     20200   17.9500  145.3100       7.4        95       798        90
VIS    2025250     20200   17.9700  145.2800       8.0        87       785        92
VIS    2025250     20200   17.9500  145.2600       7.9        92       783        92
VIS    2025250     20200   17.9700  145.0800      11.3        59       801        92
VIS    2025250     20200   17.9800  149.4000       8.4        60       985        97
VIS    2025250     20200   17.9800  149.2000       7.5        74       976        96
VIS    2025250     20200   17.9900  149.1900       7.6        70       997        98
VIS    2025250     20200   17.9700  147.2200       9.7        45       976        99
VIS    2025250     20200   17.9700  147.2200       9.7        46       976        99
VIS    2025250     20200   17.9500  147.1700       9.5        45       967        96
VIS    2025250     20200   17.9600  147.1700       9.5        45       969        95
VIS    2025250     20200   17.9700  147.1500       9.7        45       971        95
VIS    2025250     20200   17.9500  147.0000       9.7        44       984        98
VIS    2025250     20200   17.9400  146.8300      10.1        41       979        99
VIS    2025250     20200   17.9500  146.8100      10.1        42       979        99
VIS    2025250     20200   17.9500  146.8000      10.3        42       979        99
VIS    2025250     20200   17.9500  146.7700      10.3        41       977        97
VIS    2025250     20200   17.9500  146.7300      10.5        39       978        98
VIS    2025250     20200   17.9500  146.7200      10.6        39       972        98
VIS    2025250     20200   17.9500  146.7000      10.5        40       978        98
VIS    2025250     20200   17.9600  146.3300       9.6        43       974        98
VIS    2025250     20200   17.9500  146.3200       9.6        43       974        99
VIS    2025250     20200   17.9400  146.2800      11.0        40       963        98
VIS    2025250     20200   17.9500  146.2600      10.7        40       939        99
VIS    2025250     20200   17.9400  146.2500      10.6        38       939       100
VIS    2025250     20200   17.9600  146.2100      11.1        43       952        98
VIS    2025250     20200   17.9600  146.1900      11.2        47       952        97
VIS    2025250     20200   17.9500  146.1700      11.4        46       931        98
VIS    2025250     20200   17.9500  146.1500      11.4        45       923        99
VIS    2025250     20200   17.9400  146.1300      11.4        44       918        98
VIS    2025250     20200   17.9400  146.0800      10.6        44       910        98
VIS    2025250     20200   17.9600  146.0800      10.6        43       908        97
VIS    2025250     20200   17.9400  146.0500      10.6        41       905        96
VIS    2025250     20200   17.9400  146.0200      10.7        40       905        97
VIS    2025250     20200   17.9400  146.0100      10.7        40       905        97
VIS    2025250     20200   17.9600  145.9800      10.6        40       905        97
VIS    2025250     20200   17.9500  145.9600      11.0        40       916        98
VIS    2025250     20200   17.9500  145.9200      10.5        40       911        99
VIS    2025250     20200   17.9500  145.9100      10.3        40       910        99
VIS    2025250     20200   17.9500  145.8700      10.3        40       905        97
VIS    2025250     20200   17.9400  145.8500      10.2        41       907        99
VIS    2025250     20200   17.9400  145.8400      10.2        39       905        97
VIS    2025250     20200   17.9500  145.8100      10.6        37       902        96
VIS    2025250     20200   17.9500  145.7800      10.5        39       902        97
VIS    2025250     20200   17.9500  145.7500      10.1        37       902        97
VIS    2025250     20200   17.9500  145.4800       8.7        87       709        98
VIS    2025250     20200   17.9400  145.4700       8.7        87       713        97
VIS    2025250     20200   17.9400  145.3500       6.8        92       708        96
VIS    2025250     20200   17.9400  145.3200       7.1        90       797        92
VIS    2025250     20200   17.9400  145.2700       7.6        95       798        90
VIS    2025250     20200   17.9500  145.0200      11.2        79       710        90
VIS    2025250     20200   17.9400  145.0100      11.0        78       710        91
VIS    2025250     20200   17.9500  149.3900       6.7        56       981        95
VIS    2025250     20200   17.9500  149.3700       6.7        57       983        96
VIS    2025250     20200   17.9500  149.1800       7.8        67       985        97
VIS    2025250     20200   17.9400  149.1100       8.1        62       974        95
VIS    2025250     20200   17.9400  148.9700       7.3        63       979        94
VIS    2025250     20200   17.9400  147.2400       9.7        44       979        99
VIS    2025250     20200   17.9400  147.2200      10.0        45       976        99
VIS    2025250     20200   17.9400  147.2100      10.1        45       973        99
VIS    2025250     20200   17.9400  147.1700       9.6        44       966        97
VIS    2025250     20200   17.9400  147.1500       9.8        45       965        96
VIS    2025250     20200   17.9300  147.0400       9.7        44       994        98
VIS    2025250     20200   17.9400  147.0000      10.1        42       984        96
VIS    2025250     20200   17.9200  146.9900       9.6        41       975        99
VIS    2025250     20200   17.9400  146.8300      10.3        42       979        98
VIS    2025250     20200   17.9400  146.8100      10.4        42       979        98
VIS    2025250     20200   17.9400  146.7200      10.5        39       978        99
VIS    2025250     20200   17.9200  146.6800      10.7        41       980        98
VIS    2025250     20200   17.9200  146.6600      10.5        42       980        98
VIS    2025250     20200   17.9300  146.5900      10.1        46       996        95
VIS    2025250     20200   17.9200  146.5600      10.0        45       990        97
VIS    2025250     20200   17.9300  146.5500       9.7        45       990        97
VIS    2025250     20200   17.9300  146.4600       9.3        51       977        93
VIS    2025250     20200   17.9300  146.3200       9.7        42       974        99
VIS    2025250     20200   17.9300  146.3000      10.4        39       973        99
VIS    2025250     20200   17.9100  146.2700      11.0        35       951        96
VIS    2025250     20200   17.9300  146.2400      10.7        38       945       100
VIS    2025250     20200   17.9300  146.2400      10.7        39       945       100
VIS    2025250     20200   17.9300  146.1900      11.1        47       934        98
VIS    2025250     20200   17.9100  146.1700      10.9        46       934        99
VIS    2025250     20200   17.9300  146.1600      11.2        45       927        99
VIS    2025250     20200   17.9200  146.1200      11.4        45       919        98
VIS    2025250     20200   17.9300  146.1000      11.1        45       915        99
VIS    2025250     20200   17.9300  146.0700      10.4        41       906        97
VIS    2025250     20200   17.9200  146.0600      10.4        41       905        96
VIS    2025250     20200   17.9200  146.0200      10.7        40       905        96
VIS    2025250     20200   17.9100  146.0100      10.6        41       906        97
VIS    2025250     20200   17.9300  145.9800      10.8        41       905        98
VIS    2025250     20200   17.9200  145.9700      10.9        41       906        98
VIS    2025250     20200   17.9300  145.9300      10.6        41       912        99
VIS    2025250     20200   17.9100  145.9100      10.4        41       911        98
VIS    2025250     20200   17.9100  145.8800      10.1        39       908        98
VIS    2025250     20200   17.9300  145.8500      10.0        41       911        99
VIS    2025250     20200   17.9100  145.8400      10.0        39       909        99
VIS    2025250     20200   17.9200  145.8100       9.9        38       902        97
VIS    2025250     20200   17.9100  145.8000      10.0        37       904        97
VIS    2025250     20200   17.9200  145.7500      10.2        33       904        95
VIS    2025250     20200   17.9100  145.4800       9.0        86       701        98
VIS    2025250     20200   17.9300  145.4600       8.9        86       726        96
VIS    2025250     20200   17.9100  145.4200       8.4        87       707        99
VIS    2025250     20200   17.9100  145.3400       7.7        88       706        94
VIS    2025250     20200   17.9200  145.3400       7.3        93       710        93
VIS    2025250     20200   17.9100  145.1000      12.0        84       731        92
VIS    2025250     20200   17.9000  145.1000      11.8        84       724        93
VIS    2025250     20200   17.9100  145.0000      11.1        80       710        94
VIS    2025250     20200   17.9200  144.8600      11.2        69       710        90
VIS    2025250     20200   17.9400  149.7100       9.1        79       978        93
VIS    2025250     20200   17.9300  149.6900       8.4        70       978        96
VIS    2025250     20200   17.9400  149.6700       7.8        69       949        90
VIS    2025250     20200   17.9200  149.6300       7.6        67       969        91
VIS    2025250     20200   17.9200  149.5800       7.7        70       973        96
VIS    2025250     20200   17.9200  149.5800       7.6        70       973        97
VIS    2025250     20200   17.9400  149.4600       7.2        57       998        95
VIS    2025250     20200   17.9200  149.3900       6.7        60       956        98
VIS    2025250     20200   17.9300  149.3800       6.9        60       956        98
VIS    2025250     20200   17.9200  149.1900       6.6        58       965        98
VIS    2025250     20200   17.9400  149.1300       7.8        64       977        93
VIS    2025250     20200   17.9400  149.1000       8.2        59       974        96
VIS    2025250     20200   17.9300  149.0900       8.6        57       974        97
VIS    2025250     20200   17.9200  149.0200       5.5        65       987        93
VIS    2025250     20200   17.9200  149.0000       6.4        69       985        94
VIS    2025250     20200   17.9400  148.9600       7.3        66       979        98
VIS    2025250     20200   17.9000  147.2400       9.4        46       990        94
VIS    2025250     20200   17.9000  147.2400       9.7        47       990        98
VIS    2025250     20200   17.9000  147.2000      10.0        46       977        98
VIS    2025250     20200   17.9100  147.1800      10.1        45       962        98
VIS    2025250     20200   17.9100  147.1700      10.0        44       959        99
VIS    2025250     20200   17.9000  147.1300      10.1        45       955        98
VIS    2025250     20200   17.9200  147.0600       9.8        46       994        97
VIS    2025250     20200   17.9000  147.0300       9.8        42       980        98
VIS    2025250     20200   17.9000  146.9500       9.8        39       977        98
VIS    2025250     20200   17.9000  146.9500       9.8        39       980        98
VIS    2025250     20200   17.9000  146.9100      10.3        40       971        94
VIS    2025250     20200   17.8900  146.8300      10.6        40       994        97
VIS    2025250     20200   17.8900  146.8000      10.9        42       993        94
VIS    2025250     20200   17.9100  146.6500      10.3        42       993        97
VIS    2025250     20200   17.9000  146.5900      10.3        41       989        92
VIS    2025250     20200   17.8900  146.5600      10.1        44       978        97
VIS    2025250     20200   17.9000  146.5600      10.0        44       989        97
VIS    2025250     20200   17.8900  146.5300       9.6        45       972        96
VIS    2025250     20200   17.8900  146.4900       9.9        46       977        95
VIS    2025250     20200   17.8900  146.4700       9.5        48       966        97
VIS    2025250     20200   17.8900  146.4600       9.4        50       966        96
VIS    2025250     20200   17.9100  146.4300       9.3        51       976        94
VIS    2025250     20200   17.8900  146.3200       9.8        39       973        92
VIS    2025250     20200   17.8900  146.3100       9.8        36       970        92
VIS    2025250     20200   17.9100  146.2700      11.2        36       951        96
VIS    2025250     20200   17.8900  146.2500      11.0        38       947        98
VIS    2025250     20200   17.9000  146.2300      10.9        38       947        99
VIS    2025250     20200   17.9000  146.2100      10.9        39       945        99
VIS    2025250     20200   17.8900  146.1800      10.7        44       934        99
VIS    2025250     20200   17.9000  146.1600      10.8        44       935        99
VIS    2025250     20200   17.9000  146.1200      11.3        45       926        99
VIS    2025250     20200   17.9100  146.1200      11.4        45       926        99
VIS    2025250     20200   17.9000  146.0700      10.5        43       911        99
VIS    2025250     20200   17.9000  146.0600      10.2        41       910        99
VIS    2025250     20200   17.8900  146.0400      10.1        39       908        99
VIS    2025250     20200   17.8900  146.0200      10.1        40       906        98
VIS    2025250     20200   17.8900  145.9700      10.7        41       903        96
VIS    2025250     20200   17.9000  145.9700      10.8        41       903        97
VIS    2025250     20200   17.9100  145.9400      10.7        40       911        98
VIS    2025250     20200   17.8900  145.9000      10.3        42       906        98
VIS    2025250     20200   17.8900  145.9000      10.3        42       906        98
VIS    2025250     20200   17.8900  145.8600      10.4        39       906        98
VIS    2025250     20200   17.9000  145.8400      10.4        39       909        99
VIS    2025250     20200   17.9000  145.8200       9.9        42       909        99
VIS    2025250     20200   17.9000  145.8000       9.8        40       906        99
VIS    2025250     20200   17.8900  145.7700      10.0        34       912        97
VIS    2025250     20200   17.8900  145.7500      10.2        33       919        98
VIS    2025250     20200   17.8800  145.5200       8.4        99       714        91
VIS    2025250     20200   17.9000  145.4800       9.1        86       701        98
VIS    2025250     20200   17.8800  145.4300       8.4        86       715        98
VIS    2025250     20200   17.8900  145.4300       8.5        86       710        98
VIS    2025250     20200   17.9000  145.3400       7.7        87       706        95
VIS    2025250     20200   17.9000  145.1000      11.2        83       724        95
VIS    2025250     20200   17.8900  145.0900      10.8        83       719        96
VIS    2025250     20200   17.9200  149.6800       8.0        65       978        93
VIS    2025250     20200   17.9200  149.6600       7.8        63       949        96
VIS    2025250     20200   17.9000  149.6300       7.8        61       949        99
VIS    2025250     20200   17.9000  149.6200       7.6        61       949        96
VIS    2025250     20200   17.9200  149.5800       7.7        70       967        97
VIS    2025250     20200   17.9000  149.4500       7.0        62       955        98
VIS    2025250     20200   17.9000  149.4200       6.6        58       954        98
VIS    2025250     20200   17.9200  149.3900       6.6        59       956        98
VIS    2025250     20200   17.9200  149.3700       6.8        60       933        97
VIS    2025250     20200   17.9100  149.2000       6.5        62       982        97
VIS    2025250     20200   17.9100  149.1800       6.6        59       965        98
VIS    2025250     20200   17.9000  149.1500       7.6        59       955        92
VIS    2025250     20200   17.9100  149.1000       8.0        57       990        93
VIS    2025250     20200   17.9100  149.0900       7.8        57       990        90
VIS    2025250     20200   17.8900  149.0000       5.4        66       985        92
VIS    2025250     20200   17.8900  148.9800       5.2        68       979        93
VIS    2025250     20200   17.8800  147.1900      10.1        46       981        99
VIS    2025250     20200   17.8700  147.1600      10.0        43       975        99
VIS    2025250     20200   17.8700  147.1500      10.0        43       975        99
VIS    2025250     20200   17.8900  147.1200      10.4        43       960        98
VIS    2025250     20200   17.8900  147.1000      10.4        43       960        97
VIS    2025250     20200   17.8800  147.0800      10.7        41       976        94
VIS    2025250     20200   17.8900  147.0300       9.9        41       980        98
VIS    2025250     20200   17.8800  146.9900       9.5        40       975       100
VIS    2025250     20200   17.8900  146.9500       9.9        39       980        98
VIS    2025250     20200   17.8900  146.9400       9.9        39       981        98
VIS    2025250     20200   17.8800  146.8300      10.6        40       993        98
VIS    2025250     20200   17.8900  146.8100      10.9        42       993        94
VIS    2025250     20200   17.8700  146.6500      10.6        44       998        91
VIS    2025250     20200   17.8700  146.6300      10.2        43       965        92
VIS    2025250     20200   17.8800  146.6000       9.9        41       964        95
VIS    2025250     20200   17.8800  146.5900      10.1        40       959        95
VIS    2025250     20200   17.8700  146.5700      10.3        41       945        97
VIS    2025250     20200   17.8800  146.5100       9.9        44       978        94
VIS    2025250     20200   17.8700  146.4900       9.8        45       977        96
VIS    2025250     20200   17.8800  146.4600       9.5        49       966        97
VIS    2025250     20200   17.8700  146.4500       9.4        49       950        98
VIS    2025250     20200   17.8700  146.4200       9.5        47       963        94
VIS    2025250     20200   17.8700  146.3300      10.4        43       970        90
VIS    2025250     20200   17.8700  146.3100      10.2        41       951        97
VIS    2025250     20200   17.8700  146.3000      10.2        40       951        99
VIS    2025250     20200   17.8800  146.2800      10.8        38       945        99
VIS    2025250     20200   17.8700  146.2500      10.4        43       933       100
VIS    2025250     20200   17.8700  146.2300      10.2        42       942       100
VIS    2025250     20200   17.8800  146.1900      10.7        41       934        99
VIS    2025250     20200   17.8700  146.1700      10.6        42       933        99
VIS    2025250     20200   17.8800  146.1500      10.5        42       934        99
VIS    2025250     20200   17.8600  146.1200      11.2        42       933        99
VIS    2025250     20200   17.8700  146.1000      11.3        45       927        99
VIS    2025250     20200   17.8700  146.0900      11.2        44       921        99
VIS    2025250     20200   17.8800  146.0500      10.2        40       910        99
VIS    2025250     20200   17.8600  146.0300      10.1        38       910        99
VIS    2025250     20200   17.8600  145.9900      10.1        42       906        96
VIS    2025250     20200   17.8800  145.9800      10.5        41       903        96
VIS    2025250     20200   17.8600  145.9500      10.6        40       903        95
VIS    2025250     20200   17.8800  145.9300      10.6        41       905        97
VIS    2025250     20200   17.8800  145.9000      10.6        42       906        98
VIS    2025250     20200   17.8700  145.8700      10.6        39       906        98
VIS    2025250     20200   17.8800  145.8700      10.7        39       906        98
VIS    2025250     20200   17.8800  145.8300      10.2        40       908        99
VIS    2025250     20200   17.8800  145.8200       9.9        41       909        99
VIS    2025250     20200   17.8800  145.7900       9.6        37       919        99
VIS    2025250     20200   17.8600  145.7700      10.4        35       939        99
VIS    2025250     20200   17.8700  145.7300      10.6        38       974        99
VIS    2025250     20200   17.8800  145.5300       8.1       104       714        91
VIS    2025250     20200   17.8600  145.5200       8.0        95       714        94
VIS    2025250     20200   17.8600  145.4600       8.5        85       701        99
VIS    2025250     20200   17.8700  145.4300       8.3        87       715        98
VIS    2025250     20200   17.8700  145.4200       8.5        88       710        98
VIS    2025250     20200   17.8700  145.3900       8.4        88       710        97
VIS    2025250     20200   17.8600  145.3700       7.9        84       705        98
VIS    2025250     20200   17.8600  145.3000       7.1        92       777        90
VIS    2025250     20200   17.9000  149.6700       8.0        66       978        92
VIS    2025250     20200   17.8900  149.6500       7.9        60       969        98
VIS    2025250     20200   17.8700  149.4900       7.4        55       980        95
VIS    2025250     20200   17.8900  149.4400       6.9        59       955        98
VIS    2025250     20200   17.8900  149.3900       7.1        52       933        98
VIS    2025250     20200   17.8900  149.3900       7.5        49       933        96
VIS    2025250     20200   17.8900  149.2000       6.3        66       984        94
VIS    2025250     20200   17.8800  149.1600       8.1        54       955        98
VIS    2025250     20200   17.8700  149.1400       8.3        55       955        95
VIS    2025250     20200   17.8900  148.9900       5.2        65       985        93
VIS    2025250     20200   17.8700  147.1600      10.0        42       975        99
VIS    2025250     20200   17.8700  147.1300      10.2        43       960        99
VIS    2025250     20200   17.8700  147.1200      10.4        43       969        98
VIS    2025250     20200   17.8600  147.0800      10.4        41       969        97
VIS    2025250     20200   17.8500  147.0700      10.3        41       976        97
VIS    2025250     20200   17.8500  147.0400       9.7        42       977        93
VIS    2025250     20200   17.8500  147.0100       9.6        43       976        97
VIS    2025250     20200   17.8600  146.7800      10.8        41       972        98
VIS    2025250     20200   17.8600  146.7700      10.8        41       972        98
VIS    2025250     20200   17.8400  146.7300      10.0        42       983        98
VIS    2025250     20200   17.8400  146.7200      10.1        41       983        97
VIS    2025250     20200   17.8500  146.6800      10.9        42       986        95
VIS    2025250     20200   17.8500  146.6500      10.5        42       965        99
VIS    2025250     20200   17.8400  146.6500      10.5        43       965        99
VIS    2025250     20200   17.8600  146.5800      10.1        40       945        99
VIS    2025250     20200   17.8600  146.5200      10.1        44       950        99
VIS    2025250     20200   17.8600  146.4900       9.9        42       972        97
VIS    2025250     20200   17.8600  146.4700       9.6        45       966        96
VIS    2025250     20200   17.8500  146.4500       9.6        44       948        98
VIS    2025250     20200   17.8500  146.4300       9.1        46       941        99
VIS    2025250     20200   17.8500  146.4000       8.8        49       922        97
VIS    2025250     20200   17.8600  146.3800       9.0        50       990        96
VIS    2025250     20200   17.8400  146.3400      10.2        43       946        93
VIS    2025250     20200   17.8500  146.3300      10.3        43       946        95
VIS    2025250     20200   17.8600  146.3000      10.3        42       946        98
VIS    2025250     20200   17.8500  146.2700      10.6        43       932        99
VIS    2025250     20200   17.8400  146.2400       9.4        47       933        99
VIS    2025250     20200   17.8500  146.2300       9.2        46       933        98
VIS    2025250     20200   17.8400  146.2000      10.3        45       926        98
VIS    2025250     20200   17.8500  146.1800      11.0        45       927        96
VIS    2025250     20200   17.8400  146.1400      11.0        43       927        99
VIS    2025250     20200   17.8600  146.1400      11.0        41       933        99
VIS    2025250     20200   17.8400  146.0900      11.6        44       927        98
VIS    2025250     20200   17.8400  146.0900      11.6        45       925        98
VIS    2025250     20200   17.8400  146.0500      10.7        43       914        99
VIS    2025250     20200   17.8400  146.0300      10.4        41       912        99
VIS    2025250     20200   17.8400  146.0000      10.4        43       912        99
VIS    2025250     20200   17.8500  145.9700      10.3        41       906        97
VIS    2025250     20200   17.8500  145.9700      10.3        41       905        96
VIS    2025250     20200   17.8600  145.9300      10.8        40       905        96
VIS    2025250     20200   17.8400  145.9000      11.1        41       907        98
VIS    2025250     20200   17.8500  145.8900      11.0        41       905        98
VIS    2025250     20200   17.8500  145.8600      11.0        38       907        96
VIS    2025250     20200   17.8500  145.8400      10.7        38       909        98
VIS    2025250     20200   17.8500  145.8100      10.4        27       939        94
VIS    2025250     20200   17.8500  145.7800      10.6        31       939        98
VIS    2025250     20200   17.8600  145.7700      10.6        35       939        99
VIS    2025250     20200   17.8400  145.7300      11.0        41       959        98
VIS    2025250     20200   17.8500  145.5300       7.5       102       714        92
VIS    2025250     20200   17.8500  145.5200       8.0        96       714        95
VIS    2025250     20200   17.8400  145.5000       7.7        89       714        97
VIS    2025250     20200   17.8500  145.4600       8.5        85       701        99
VIS    2025250     20200   17.8500  145.4400       8.1        87       707        99
VIS    2025250     20200   17.8500  145.4200       8.4        88       710        98
VIS    2025250     20200   17.8300  145.3900       8.5        88       709        98
VIS    2025250     20200   17.8500  145.3600       7.7        82       705        98
VIS    2025250     20200   17.8500  145.3500       7.5        83       705        98
VIS    2025250     20200   17.8700  149.6400       7.4        59       975        99
VIS    2025250     20200   17.8600  149.1500       8.3        55       955        93
VIS    2025250     20200   17.8400  149.1200       8.0        52       935        98
VIS    2025250     20200   17.8500  149.1000       7.6        61       933        91
VIS    2025250     20200   17.8400  149.0700       7.5        61       935        91
VIS    2025250     20200   17.8300  147.2300       9.5        43       988        95
VIS    2025250     20200   17.8300  147.1800       9.5        42       979        99
VIS    2025250     20200   17.8400  147.1800       9.9        43       981        99
VIS    2025250     20200   17.8200  147.1400       9.4        44       964        99
VIS    2025250     20200   17.8400  147.1200       9.9        42       969        99
VIS    2025250     20200   17.8200  147.1000       9.8        45       968        99
VIS    2025250     20200   17.8300  147.0600      10.1        40       967        96
VIS    2025250     20200   17.8400  147.0500      10.2        40       967        96
VIS    2025250     20200   17.8400  147.0100       9.8        43       966        98
VIS    2025250     20200   17.8400  147.0100       9.7        43       966        98
VIS    2025250     20200   17.8300  146.7700      10.0        41       986        99
VIS    2025250     20200   17.8300  146.6900      10.7        42       979        98
VIS    2025250     20200   17.8400  146.5500      10.6        42       928        99
VIS    2025250     20200   17.8400  146.5500      10.7        42       928        99
VIS    2025250     20200   17.8400  146.5200      10.9        43       941        99
VIS    2025250     20200   17.8200  146.4600      10.1        43       948        96
VIS    2025250     20200   17.8400  146.4300       9.2        45       922        99
VIS    2025250     20200   17.8200  146.4100       8.9        45       920        98
VIS    2025250     20200   17.8300  146.3900       8.7        49       922        96
VIS    2025250     20200   17.8400  146.3300      10.3        43       946        95
VIS    2025250     20200   17.8200  146.3200      10.3        42       936        96
VIS    2025250     20200   17.8200  146.2800      10.4        39       928        97
VIS    2025250     20200   17.8400  146.2600      10.3        44       933        98
VIS    2025250     20200   17.8300  146.2400       9.5        45       940        98
VIS    2025250     20200   17.8300  146.2100       9.8        47       928        99
VIS    2025250     20200   17.8200  146.2000      10.6        44       928        99
VIS    2025250     20200   17.8300  146.1600      10.8        44       923        98
VIS    2025250     20200   17.8200  146.1400      10.9        45       925        99
VIS    2025250     20200   17.8200  146.1300      11.1        44       927        99
VIS    2025250     20200   17.8200  146.0900      11.5        45       922        98
VIS    2025250     20200   17.8100  146.0800      11.3        44       922        99
VIS    2025250     20200   17.8200  146.0400      10.7        43       908        99
VIS    2025250     20200   17.8200  146.0300      10.8        42       908        99
VIS    2025250     20200   17.8300  146.0100      10.5        43       912        99
VIS    2025250     20200   17.8300  145.9900      10.6        43       909        99
VIS    2025250     20200   17.8200  145.9400      10.9        39       909        98
VIS    2025250     20200   17.8200  145.9300      11.0        39       908        98
VIS    2025250     20200   17.8300  145.8900      11.1        41       907        98
VIS    2025250     20200   17.8300  145.8900      11.1        42       907        98
VIS    2025250     20200   17.8300  145.8500      11.2        41       911        96
VIS    2025250     20200   17.8200  145.8100      10.7        39       934        95
VIS    2025250     20200   17.8100  145.7800       8.2        23       935        94
VIS    2025250     20200   17.8300  145.7500      10.9        40       935        99
VIS    2025250     20200   17.8300  145.7400      11.0        41       935        99
VIS    2025250     20200   17.8300  145.7100      10.8        40       959        99
VIS    2025250     20200   17.8300  145.6800      10.5        39       983        98
VIS    2025250     20200   17.8300  145.4900       7.9        88       733        95
VIS    2025250     20200   17.8400  149.1300       8.2        50       941        95
VIS    2025250     20200   17.8200  149.1100       8.0        56       935        99
VIS    2025250     20200   17.8300  149.0900       7.9        56       935        96
VIS    2025250     20200   17.8300  149.0700       7.5        58       935        91
VIS    2025250     20200   17.8000  147.2000       8.7        39       973        99
VIS    2025250     20200   17.8000  147.1900       8.8        40       969        99
VIS    2025250     20200   17.8000  147.1600       9.2        44       968        99
VIS    2025250     20200   17.8100  147.1400       9.5        44       964        99
VIS    2025250     20200   17.8200  147.1100       9.7        45       968        98
VIS    2025250     20200   17.8000  147.0900       9.7        45       970        98
VIS    2025250     20200   17.8100  147.0700      10.0        41       966        99
VIS    2025250     20200   17.8200  147.0400      10.4        41       964        97
VIS    2025250     20200   17.8100  147.0200      10.4        43       946        98
VIS    2025250     20200   17.8100  146.6400      11.0        43       960        92
VIS    2025250     20200   17.7900  146.5500       9.7        43       994        95
VIS    2025250     20200   17.7900  146.5400       9.5        44       994        93
VIS    2025250     20200   17.7900  146.5000       9.7        44       963        93
VIS    2025250     20200   17.8000  146.4800      10.2        43       963        94
VIS    2025250     20200   17.8100  146.4500      10.2        42       921        97
VIS    2025250     20200   17.8000  146.4500      10.2        42       919        97
VIS    2025250     20200   17.7900  146.4100       9.5        43       918        99
VIS    2025250     20200   17.7900  146.3600      10.6        42       959        95
VIS    2025250     20200   17.8000  146.3300      10.6        42       950        97
VIS    2025250     20200   17.8100  146.3300      10.5        42       937        96
VIS    2025250     20200   17.8000  146.2900       9.8        35       927        94
VIS    2025250     20200   17.8100  146.2700      10.3        35       927        90
VIS    2025250     20200   17.7900  146.2300      11.3        38       937        99
VIS    2025250     20200   17.8000  146.2200      11.1        42       937        99
VIS    2025250     20200   17.8000  146.1800      10.8        43       928        99
VIS    2025250     20200   17.8000  146.1600      10.7        44       922        99
VIS    2025250     20200   17.7900  146.1500      10.7        44       925        99
VIS    2025250     20200   17.7900  146.1300      11.0        45       925        99
VIS    2025250     20200   17.7900  146.0900      11.1        43       926       100
VIS    2025250     20200   17.8000  146.0700      11.0        43       919        99
VIS    2025250     20200   17.8000  146.0500      10.9        43       912        99
VIS    2025250     20200   17.8100  146.0200      10.9        43       908        99
VIS    2025250     20200   17.8000  146.0100      11.2        44       908        98
VIS    2025250     20200   17.8100  145.9800      11.1        43       909        99
VIS    2025250     20200   17.8000  145.9500      11.1        41       908        98
VIS    2025250     20200   17.8100  145.9200      10.8        39       908        98
VIS    2025250     20200   17.8100  145.9000      10.8        40       908        98
VIS    2025250     20200   17.8000  145.8900      10.6        45       907        99
VIS    2025250     20200   17.7900  145.8600      10.9        50       911        98
VIS    2025250     20200   17.8100  145.8300      11.0        46       926        96
VIS    2025250     20200   17.8000  145.8000       9.4        33       941        99
VIS    2025250     20200   17.8000  145.7700       7.9        28       928        95
VIS    2025250     20200   17.7900  145.7600       8.2        31       927        95
VIS    2025250     20200   17.8000  145.7300      10.4        42       926        99
VIS    2025250     20200   17.8100  145.7200      10.4        41       927        99
VIS    2025250     20200   17.8100  149.1100       8.2        58       942        92
VIS    2025250     20200   17.8100  149.0800       8.0        58       935        94
VIS    2025250     20200   17.8000  149.0600       8.0        60       918        91
VIS    2025250     20200   17.7800  147.2600       9.4        45       979        96
VIS    2025250     20200   17.7900  147.2300       8.7        43       980        96
VIS    2025250     20200   17.7900  147.2000       8.7        39       973        99
VIS    2025250     20200   17.7900  147.1800       8.9        41       969        99
VIS    2025250     20200   17.7700  147.1600       9.3        44       963        99
VIS    2025250     20200   17.7800  147.1200       9.7        46       963        98
VIS    2025250     20200   17.7700  147.1000       9.6        46       963        98
VIS    2025250     20200   17.7900  147.0900       9.5        46       970        98
VIS    2025250     20200   17.7900  147.0400      10.1        42       954        98
VIS    2025250     20200   17.7700  147.0300      10.1        43       954        99
VIS    2025250     20200   17.7700  146.9500       9.8        40       983        98
VIS    2025250     20200   17.7700  146.5700       9.9        43       968        91
VIS    2025250     20200   17.7800  146.5600       9.9        43       968        93
VIS    2025250     20200   17.7900  146.5300       9.5        44       968        92
VIS    2025250     20200   17.7800  146.5100       9.5        45       957        92
VIS    2025250     20200   17.7900  146.4700      10.3        43       939        97
VIS    2025250     20200   17.7700  146.4700      10.4        42       919        97
VIS    2025250     20200   17.7900  146.4300       9.9        42       913        98
VIS    2025250     20200   17.7900  146.3600      10.6        42       959        96
VIS    2025250     20200   17.7800  146.3400      10.6        42       959        98
VIS    2025250     20200   17.7900  146.3200      10.5        41       950        98
VIS    2025250     20200   17.7800  146.2900      10.0        38       929        93
VIS    2025250     20200   17.7900  146.2600      10.0        36       924        95
VIS    2025250     20200   17.7800  146.2500      10.5        40       927       100
VIS    2025250     20200   17.7700  146.2100      11.2        43       918        98
VIS    2025250     20200   17.7800  146.1800      11.0        43       930        99
VIS    2025250     20200   17.7900  146.1600      10.8        43       934        99
VIS    2025250     20200   17.7800  146.1500      10.8        44       934        99
VIS    2025250     20200   17.7800  146.1300      10.9        45       926        99
VIS    2025250     20200   17.7800  146.0900      11.0        43       926       100
VIS    2025250     20200   17.7800  146.0600      11.0        41       915        99
VIS    2025250     20200   17.7700  146.0400      11.2        41       912        98
VIS    2025250     20200   17.7700  146.0300      11.2        42       909        98
VIS    2025250     20200   17.7700  146.0000      11.1        45       907        98
VIS    2025250     20200   17.7800  145.9800      10.9        43       905        98
VIS    2025250     20200   17.7700  145.9600      10.7        42       904        98
VIS    2025250     20200   17.7800  145.9300      10.8        40       904        98
VIS    2025250     20200   17.7700  145.8900       9.1        43       904        97
VIS    2025250     20200   17.7600  145.8800       8.9        42       904        98
VIS    2025250     20200   17.7600  145.8600       9.5        49       914        93
VIS    2025250     20200   17.7800  145.8400      10.6        48       934        98
VIS    2025250     20200   17.7800  145.8000      10.1        32       941        98
VIS    2025250     20200   17.7600  145.7800       9.6        35       927        98
VIS    2025250     20200   17.7800  145.7600       8.3        33       927        94
VIS    2025250     20200   17.7600  145.7200       9.7        38       895        95
VIS    2025250     20200   17.7800  145.7100      10.4        39       921        95
VIS    2025250     20200   17.7500  143.8700      10.6        96       191        90
VIS    2025250     20200   17.7900  149.1400       8.3        68       989        92
VIS    2025250     20200   17.7700  149.0700       8.4        60       940        95
VIS    2025250     20200   17.7900  149.0600       8.0        62       926        96
VIS    2025250     20200   17.7800  149.0300       7.8        66       923        93
VIS    2025250     20200   17.7900  149.0200       7.7        64       926        92
VIS    2025250     20200   17.7700  147.5900       8.8        46       982        96
VIS    2025250     20200   17.7600  147.5600       8.8        46       982        98
VIS    2025250     20200   17.7600  147.5600       8.9        47       980        98
VIS    2025250     20200   17.7700  147.2900       9.7        44       979        96
VIS    2025250     20200   17.7500  147.2600       9.6        44       985        99
VIS    2025250     20200   17.7600  147.2400       9.4        44       980        98
VIS    2025250     20200   17.7500  147.2200       9.3        45       980        97
VIS    2025250     20200   17.7600  147.2000       9.1        44       963        97
VIS    2025250     20200   17.7600  147.1600       9.2        44       962        98
VIS    2025250     20200   17.7700  147.1600       9.3        44       963        99
VIS    2025250     20200   17.7600  147.1100       9.6        45       955        99
VIS    2025250     20200   17.7600  147.1000       9.6        45       955        99
VIS    2025250     20200   17.7500  146.9800      10.0        43       989        99
VIS    2025250     20200   17.7500  146.9500       9.6        42      1000        94
VIS    2025250     20200   17.7500  146.9200      10.1        42       987        95
VIS    2025250     20200   17.7500  146.6500      11.3        44       981        91
VIS    2025250     20200   17.7500  146.6200      10.5        43       981        92
VIS    2025250     20200   17.7500  146.5900       9.9        43       968        95
VIS    2025250     20200   17.7500  146.5800       9.8        44       952        94
VIS    2025250     20200   17.7500  146.5500       9.0        45       917        96
VIS    2025250     20200   17.7400  146.5200       9.2        44       912        98
VIS    2025250     20200   17.7500  146.5100       9.6        45       931        99
VIS    2025250     20200   17.7600  146.4600      10.3        41       908        96
VIS    2025250     20200   17.7500  146.4500      10.0        40       906        95
VIS    2025250     20200   17.7500  146.3200      10.6        39       959        99
VIS    2025250     20200   17.7500  146.2900      10.3        43       949        98
VIS    2025250     20200   17.7500  146.2700      10.5        46       926        98
VIS    2025250     20200   17.7500  146.2600      10.3        44       922        98
VIS    2025250     20200   17.7400  146.2200      10.3        41       820        94
VIS    2025250     20200   17.7600  146.2000      11.0        44       918        99
VIS    2025250     20200   17.7400  146.1800      10.8        45       918        99
VIS    2025250     20200   17.7600  146.1600      10.9        44       934        99
VIS    2025250     20200   17.7600  146.1300      10.8        44       937        99
VIS    2025250     20200   17.7400  146.1100      10.4        41       959        98
VIS    2025250     20200   17.7500  146.0900      10.6        41       951        99
VIS    2025250     20200   17.7500  146.0500      10.4        41       924        99
VIS    2025250     20200   17.7500  146.0300      10.6        41       912        99
VIS    2025250     20200   17.7400  146.0200      10.7        42       907        97
VIS    2025250     20200   17.7500  146.0000      10.7        44       903        99
VIS    2025250     20200   17.7400  145.9700      10.4        41       903        98
VIS    2025250     20200   17.7500  145.9300      10.9        46       901        97
VIS    2025250     20200   17.7500  145.9200      10.7        46       902        98
VIS    2025250     20200   17.7600  145.8800       8.9        42       904        97
VIS    2025250     20200   17.7400  145.8600       9.2        43       904        91
VIS    2025250     20200   17.7500  145.8500      10.0        44       914        90
VIS    2025250     20200   17.7500  145.8100      10.2        32       936        95
VIS    2025250     20200   17.7500  145.7800      10.0        35       922        95
VIS    2025250     20200   17.7500  145.7600       9.5        39       895        96
VIS    2025250     20200   17.7400  145.7500       9.3        40       872        92
VIS    2025250     20200   17.7400  145.7300       9.4        39       872        92
VIS    2025250     20200   17.7400  145.7000      10.2        34       905        98
VIS    2025250     20200   17.7300  143.8600      10.1        92       189        97
VIS    2025250     20200   17.7200  143.8600      10.2        89       197        98
VIS    2025250     20200   17.7500  149.7400       7.8        73       977        91
VIS    2025250     20200   17.7600  149.0900       8.6        59       968        90
VIS    2025250     20200   17.7500  149.0800       8.7        61       960        94
VIS    2025250     20200   17.7600  149.0600       8.2        61       928        97
VIS    2025250     20200   17.7600  149.0200       7.8        64       926        92
VIS    2025250     20200   17.7300  147.5300       9.1        47       966        99
VIS    2025250     20200   17.7500  147.2600       9.6        45       985        99
VIS    2025250     20200   17.7300  147.2300       9.2        45       977        98
VIS    2025250     20200   17.7300  147.2200       9.2        45       971        98
VIS    2025250     20200   17.7500  147.1900       9.2        44       963        96
VIS    2025250     20200   17.7400  147.1700       9.1        45       962        97
VIS    2025250     20200   17.7400  147.1300       8.9        45       953        98
VIS    2025250     20200   17.7400  147.1100       9.4        45       956        99
VIS    2025250     20200   17.7400  147.1000       9.5        45       955        99
VIS    2025250     20200   17.7300  147.0800       9.9        45       952        99
VIS    2025250     20200   17.7400  147.0000      10.3        43       973        99
VIS    2025250     20200   17.7400  146.9800       9.8        42       989        99
VIS    2025250     20200   17.7200  146.6500      11.0        43       981        94
VIS    2025250     20200   17.7300  146.6400      10.9        43       981        94
VIS    2025250     20200   17.7300  146.6200      10.4        43       928        97
VIS    2025250     20200   17.7300  146.5900      10.0        42       910        99
VIS    2025250     20200   17.7300  146.5500       9.4        43       819        94
VIS    2025250     20200   17.7200  146.5500       9.5        43       817        94
VIS    2025250     20200   17.7400  146.5100       9.8        43       917        99
VIS    2025250     20200   17.7200  146.3200      10.4        43       955        98
VIS    2025250     20200   17.7200  146.3000      10.5        43       949        97
VIS    2025250     20200   17.7200  146.2900      10.4        45       927        98
VIS    2025250     20200   17.7200  146.2700      10.4        44       922        98
VIS    2025250     20200   17.7300  146.2400      10.1        41       844        94
VIS    2025250     20200   17.7300  146.2000      10.1        43       822        95
VIS    2025250     20200   17.7200  146.1800      10.4        44       900        98
VIS    2025250     20200   17.7200  146.1700      10.5        45       900        97
VIS    2025250     20200   17.7200  146.1300      10.2        44       952        93
VIS    2025250     20200   17.7300  146.1300      10.1        42       966        96
VIS    2025250     20200   17.7300  146.0900      10.2        41       966        97
VIS    2025250     20200   17.7300  146.0600      10.0        43       937        97
VIS    2025250     20200   17.7200  146.0400      10.1        45       928        95
VIS    2025250     20200   17.7400  146.0200      10.6        42       903        96
VIS    2025250     20200   17.7200  145.9800       9.9        42       797        91
VIS    2025250     20200   17.7300  145.9700      10.4        41       799        94
VIS    2025250     20200   17.7200  145.9500      10.4        43       797        94
VIS    2025250     20200   17.7300  145.9300      11.0        45       799        92
VIS    2025250     20200   17.7200  145.9000      10.6        39       805        92
VIS    2025250     20200   17.7100  145.7600       9.7        37       814        92
VIS    2025250     20200   17.7200  145.7200       9.6        39       888        98
VIS    2025250     20200   17.7200  145.7100       9.8        37       891        98
VIS    2025250     20200   17.7100  143.8800      10.8        87       197        96
VIS    2025250     20200   17.7300  149.7700       7.9        65       952        91
VIS    2025250     20200   17.7300  149.7600       7.9        65       952        91
VIS    2025250     20200   17.7300  149.7300       7.5        75       952        93
VIS    2025250     20200   17.7400  149.0800       8.7        61       960        93
VIS    2025250     20200   17.7300  149.0500       8.4        59       935        95
VIS    2025250     20200   17.7200  149.0100       8.7        57       990        93
VIS    2025250     20200   17.7000  147.2700       9.0        43       983        97
VIS    2025250     20200   17.7100  147.2400       9.1        44       979        99
VIS    2025250     20200   17.7200  147.2300       9.1        45       977        98
VIS    2025250     20200   17.7100  147.2100       9.1        45       964        98
VIS    2025250     20200   17.7100  147.1900       8.9        45       963        98
VIS    2025250     20200   17.7000  147.1600       8.6        44       946        98
VIS    2025250     20200   17.7000  147.1300       8.5        44       941        97
VIS    2025250     20200   17.7000  147.1100       8.8        45       946        96
VIS    2025250     20200   17.7200  147.0900       9.7        46       956        97
VIS    2025250     20200   17.7000  147.0600       9.5        45       963        94
VIS    2025250     20200   17.7200  146.9200      10.1        42       970        98
VIS    2025250     20200   17.7200  146.6900      10.4        42       986        96
VIS    2025250     20200   17.7000  146.6700      10.2        41       981        98
VIS    2025250     20200   17.7000  146.6500      10.3        42       938        99
VIS    2025250     20200   17.7000  146.6300      10.4        41       928        99
VIS    2025250     20200   17.7100  146.6100      10.5        41       819        91
VIS    2025250     20200   17.7100  146.5900      10.6        40       819        90
VIS    2025250     20200   17.7200  146.5500       9.7        42       806        92
VIS    2025250     20200   17.6900  146.3400       9.9        44       960        96
VIS    2025250     20200   17.7000  146.3200      10.2        45       943        96
VIS    2025250     20200   17.7100  146.2900      10.3        45       922        98
VIS    2025250     20200   17.7100  146.2800      10.2        45       914        98
VIS    2025250     20200   17.6900  146.2600       9.8        45       897        98
VIS    2025250     20200   17.6900  146.2300       9.9        45       839        95
VIS    2025250     20200   17.7000  146.1900      10.2        43       833        95
VIS    2025250     20200   17.7100  146.1800      10.4        44       833        94
VIS    2025250     20200   17.6900  146.1400      10.6        45       827        93
VIS    2025250     20200   17.6900  146.1200      10.1        44       923        98
VIS    2025250     20200   17.6900  146.1100      10.0        44       923        98
VIS    2025250     20200   17.7100  146.0700       9.8        42       956        95
VIS    2025250     20200   17.7000  146.0500      10.0        44       946        94
VIS    2025250     20200   17.7000  146.0400      10.4        45       946        94
VIS    2025250     20200   17.6900  145.9700       9.6        44       798        91
VIS    2025250     20200   17.6900  145.9400       9.9        43       798        93
VIS    2025250     20200   17.7000  145.9100      10.2        42       799        91
VIS    2025250     20200   17.7000  145.8800      10.6        41       814        90
VIS    2025250     20200   17.6900  145.8600      10.3        41       816        92
VIS    2025250     20200   17.6900  145.8200      10.3        39       815        91
VIS    2025250     20200   17.7000  145.8000       9.8        36       814        92
VIS    2025250     20200   17.6900  145.7700      10.1        37       814        90
VIS    2025250     20200   17.7000  145.7400       9.7        41       884        94
VIS    2025250     20200   17.7000  145.7200       9.5        40       934        94
VIS    2025250     20200   17.7000  145.7000       9.5        36       963        95
VIS    2025250     20200   17.7100  145.6800       9.7        27       975        96
VIS    2025250     20200   17.7000  145.6500       9.9        30       986        97
VIS    2025250     20200   17.6900  145.6100       9.9        36       973        96
VIS    2025250     20200   17.6900  145.6000       9.7        34       973        96
VIS    2025250     20200   17.7100  149.7700       7.6        67       946        94
VIS    2025250     20200   17.7100  149.7600       7.6        67       946        95
VIS    2025250     20200   17.7200  149.0300       8.7        58       956        98
VIS    2025250     20200   17.7200  149.0100       8.8        58       990        93
VIS    2025250     20200   17.7000  147.2500       9.0        43       983        99
VIS    2025250     20200   17.6900  147.2300       9.0        43       977        99
VIS    2025250     20200   17.6800  147.2000       9.3        44       955        99
VIS    2025250     20200   17.6900  147.1900       9.1        44       955        99
VIS    2025250     20200   17.7000  147.1500       8.6        43       941        98
VIS    2025250     20200   17.7000  147.1300       8.7        45       941        97
VIS    2025250     20200   17.7000  147.1000       9.2        46       947        97
VIS    2025250     20200   17.6800  147.0900       9.5        46       940        98
VIS    2025250     20200   17.6800  147.0500       9.6        45       955        98
VIS    2025250     20200   17.6800  147.0500       9.6        45       958        97
VIS    2025250     20200   17.6900  146.6700      10.2        41       981        99
VIS    2025250     20200   17.6700  146.6500       9.9        42       932       100
VIS    2025250     20200   17.6800  146.6100      10.4        40       819        91
VIS    2025250     20200   17.6900  146.6000      10.6        39       817        90
VIS    2025250     20200   17.6700  146.3500       9.9        44       983        96
VIS    2025250     20200   17.6800  146.3500       9.8        44       960        97
VIS    2025250     20200   17.6700  146.3200       9.7        45       939        96
VIS    2025250     20200   17.6800  146.3000      10.0        46       915       100
VIS    2025250     20200   17.6800  146.2500      10.0        45       850        94
VIS    2025250     20200   17.6900  146.2300       9.9        45       839        94
VIS    2025250     20200   17.6900  146.2300      10.0        46       839        95
VIS    2025250     20200   17.6800  146.1900      10.2        44       839        95
VIS    2025250     20200   17.6900  146.1700      10.6        44       833        94
VIS    2025250     20200   17.6700  146.1300      10.6        46       827        95
VIS    2025250     20200   17.6700  146.1100      10.3        44       880        97
VIS    2025250     20200   17.6800  146.1000      10.1        43       915        99
VIS    2025250     20200   17.6700  146.0800       9.9        43       923        97
VIS    2025250     20200   17.6700  146.0500       9.9        44       941        97
VIS    2025250     20200   17.6800  146.0200      10.0        44       913        98
VIS    2025250     20200   17.6800  146.0100      10.0        44       913        98
VIS    2025250     20200   17.6700  145.9700      10.1        44       811        94
VIS    2025250     20200   17.6800  145.9500       9.6        45       800        94
VIS    2025250     20200   17.6800  145.9200       9.4        44       802        93
VIS    2025250     20200   17.6700  145.8700      10.6        46       831        94
VIS    2025250     20200   17.6800  145.8400       9.9        42       823        94
VIS    2025250     20200   17.6800  145.8300       9.8        39       818        93
VIS    2025250     20200   17.6700  145.8100       9.6        39       814        92
VIS    2025250     20200   17.6600  145.7800       9.9        40       816        93
VIS    2025250     20200   17.6700  145.7500      10.3        42       929        98
VIS    2025250     20200   17.6600  145.7200       9.9        45       929        97
VIS    2025250     20200   17.6700  145.7100       9.5        40       962        92
VIS    2025250     20200   17.6700  145.6600      10.3        43       986        96
VIS    2025250     20200   17.6700  145.6200       9.9        40       970        98
VIS    2025250     20200   17.6700  145.6200      10.0        40       970        98
VIS    2025250     20200   17.6800  149.7800       7.1        65       977        92
VIS    2025250     20200   17.6900  149.7600       7.3        67       930        95
VIS    2025250     20200   17.6800  149.7200       6.6        68       952        97
VIS    2025250     20200   17.6800  149.7100       6.4        73       966        96
VIS    2025250     20200   17.6700  147.2300       9.2        42       979       100
VIS    2025250     20200   17.6700  147.1900       9.4        44       955        99
VIS    2025250     20200   17.6700  147.1600       9.4        44       941        99
VIS    2025250     20200   17.6500  147.1400       9.5        44       936       100
VIS    2025250     20200   17.6500  147.1200       9.5        46       936        99
VIS    2025250     20200   17.6600  147.1100       9.7        47       937        98
VIS    2025250     20200   17.6700  147.0700       9.6        46       951        97
VIS    2025250     20200   17.6700  147.0600       9.5        46       955        98
VIS    2025250     20200   17.6600  146.8100       8.9        43       986        91
VIS    2025250     20200   17.6500  146.7800       9.2        43       973        96
VIS    2025250     20200   17.6500  146.7700       9.2        44       974        96
VIS    2025250     20200   17.6500  146.7400       9.4        43       977        97
VIS    2025250     20200   17.6500  146.3400       9.7        44       957        97
VIS    2025250     20200   17.6500  146.3300       9.6        44       954        98
VIS    2025250     20200   17.6400  146.3100       9.7        45       932        98
VIS    2025250     20200   17.6400  146.2700      10.2        46       832        93
VIS    2025250     20200   17.6500  146.2500      10.2        45       812        91
VIS    2025250     20200   17.6500  146.2400      10.3        44       819        95
VIS    2025250     20200   17.6500  146.2000      10.3        46       846        95
VIS    2025250     20200   17.6500  146.1900      10.3        45       905        99
VIS    2025250     20200   17.6600  146.1700      10.5        46       846        94
VIS    2025250     20200   17.6600  146.1300      10.6        46       827        95
VIS    2025250     20200   17.6600  146.1200      10.4        45       840        95
VIS    2025250     20200   17.6500  146.0800      10.1        44       827        95
VIS    2025250     20200   17.6400  146.0700      10.1        45       826        95
VIS    2025250     20200   17.6500  146.0300       9.6        45       840        96
VIS    2025250     20200   17.6400  146.0200       9.5        45       840        96
VIS    2025250     20200   17.6400  145.9800      10.5        43       818        94
VIS    2025250     20200   17.6600  145.9700      10.3        44       811        93
VIS    2025250     20200   17.6600  145.9500       9.8        45       811        96
VIS    2025250     20200   17.6500  145.9200       9.6        43       880        98
VIS    2025250     20200   17.6500  145.8800      10.7        48       890        98
VIS    2025250     20200   17.6600  145.8500      10.5        47       890        99
VIS    2025250     20200   17.6600  145.8100       9.5        38       909        97
VIS    2025250     20200   17.6400  145.7900       9.0        40       818        94
VIS    2025250     20200   17.6400  145.7800       9.6        43       816        95
VIS    2025250     20200   17.6600  145.7600      10.2        44       833        95
VIS    2025250     20200   17.6500  145.7200       9.7        47       878        99
VIS    2025250     20200   17.6400  145.6900      10.0        43       878        97
VIS    2025250     20200   17.6400  145.6700      10.1        42       891        99
VIS    2025250     20200   17.6400  145.6600       9.9        42       888        99
VIS    2025250     20200   17.6600  145.6300       9.8        40       888        98
VIS    2025250     20200   17.6300  143.9400      10.2        87       192        97
VIS    2025250     20200   17.6300  143.9100       9.9        85       194        96
VIS    2025250     20200   17.6300  143.1000      15.7        81       195        95
VIS    2025250     20200   17.6700  149.7900       7.1        65       977        99
VIS    2025250     20200   17.6700  149.7800       7.2        63       946        98
VIS    2025250     20200   17.6600  149.7400       7.6        60       946        94
VIS    2025250     20200   17.6600  149.7100       6.9        65       957        95
VIS    2025250     20200   17.6600  149.7000       6.9        66       957        94
VIS    2025250     20200   17.6500  147.4700       8.6        40       976       100
VIS    2025250     20200   17.6400  147.4600       8.7        42       976        99
VIS    2025250     20200   17.6300  147.4300       8.8        43       976        97
VIS    2025250     20200   17.6400  147.2400       9.2        41       982        98
VIS    2025250     20200   17.6500  147.1900      10.1        44       955        97
VIS    2025250     20200   17.6400  147.1700      10.1        43       941        98
VIS    2025250     20200   17.6400  147.1600      10.0        43       939        99
VIS    2025250     20200   17.6500  147.1400       9.5        44       933       100
VIS    2025250     20200   17.6400  147.0900       9.7        47       937        98
VIS    2025250     20200   17.6500  147.0900       9.7        47       940        98
VIS    2025250     20200   17.6400  147.0600       9.3        47       955        98
VIS    2025250     20200   17.6300  147.0300       9.2        47       958        98
VIS    2025250     20200   17.6300  147.0000       9.3        45       964        99
VIS    2025250     20200   17.6300  146.9900       9.5        44       964        99
VIS    2025250     20200   17.6300  146.8400       9.3        41       970       100
VIS    2025250     20200   17.6200  146.8000       9.3        43       969        99
VIS    2025250     20200   17.6400  146.7800       9.2        44       972        97
VIS    2025250     20200   17.6300  146.7500       9.3        43       963        96
VIS    2025250     20200   17.6400  146.7300       9.4        43       972        96
VIS    2025250     20200   17.6200  146.6900       9.2        44       966        97
VIS    2025250     20200   17.6200  146.3600       9.9        43       977        96
VIS    2025250     20200   17.6300  146.3400       9.9        43       968        98
VIS    2025250     20200   17.6400  146.3200       9.7        43       940        99
VIS    2025250     20200   17.6300  146.3100      10.0        45       932        99
VIS    2025250     20200   17.6200  146.2600       9.9        47       802        91
VIS    2025250     20200   17.6300  146.2600      10.0        46       812        92
VIS    2025250     20200   17.6300  146.2300      10.1        45       844        95
VIS    2025250     20200   17.6200  146.2100       9.9        44       905       100
VIS    2025250     20200   17.6200  146.1700      10.5        45       909        97
VIS    2025250     20200   17.6400  146.1500      10.7        47       850        94
VIS    2025250     20200   17.6300  146.1200      10.7        46       837        93
VIS    2025250     20200   17.6200  146.1000      10.6        45       821        94
VIS    2025250     20200   17.6200  146.0800      10.4        45       822        94
VIS    2025250     20200   17.6300  146.0500      10.0        45       826        95
VIS    2025250     20200   17.6300  146.0300       9.8        45       835        96
VIS    2025250     20200   17.6400  146.0000       9.9        44       840        95
VIS    2025250     20200   17.6300  145.9900      10.1        44       835        95
VIS    2025250     20200   17.6400  145.9600      10.7        45       827        95
VIS    2025250     20200   17.6400  145.9400      10.1        44       880        99
VIS    2025250     20200   17.6300  145.9200      10.2        43       951        95
VIS    2025250     20200   17.6200  145.9000      10.9        47       952        92
VIS    2025250     20200   17.6200  145.8700      11.2        49       946        94
VIS    2025250     20200   17.6300  145.8500      10.9        44       936        96
VIS    2025250     20200   17.6300  145.8100       8.8        38       912        96
VIS    2025250     20200   17.6200  145.7800       9.4        41       818        96
VIS    2025250     20200   17.6300  145.7700       9.8        43       816        95
VIS    2025250     20200   17.6200  145.7400       9.7        52       816        97
VIS    2025250     20200   17.6200  145.7100      10.0        47       856        95
VIS    2025250     20200   17.6300  145.6800      10.0        42       859        95
VIS    2025250     20200   17.6200  145.6700       9.9        41       855        95
VIS    2025250     20200   17.6000  143.9300      10.0        88       192        93
VIS    2025250     20200   17.6200  143.9100       9.9        85       192        94
VIS    2025250     20200   17.6100  143.1200      15.9        77       195        94
VIS    2025250     20200   17.6400  149.8600       7.1        71       988        93
VIS    2025250     20200   17.6500  149.7900       7.0        66       977        99
VIS    2025250     20200   17.6500  149.7500       7.7        60       946        94
VIS    2025250     20200   17.6500  149.7200       7.3        63       947        95
VIS    2025250     20200   17.6500  149.7100       7.1        63       949        95
VIS    2025250     20200   17.6100  147.4700       9.0        42       981        93
VIS    2025250     20200   17.6100  147.4400       9.0        42       964        92
VIS    2025250     20200   17.6300  147.4200       8.7        43       973        96
VIS    2025250     20200   17.6100  147.4100       8.9        43       968        97
VIS    2025250     20200   17.6000  147.2400       8.8        37       993        95
VIS    2025250     20200   17.6100  147.2000      10.1        43       980        90
VIS    2025250     20200   17.6000  147.1700       9.9        42       949        96
VIS    2025250     20200   17.6100  147.1700      10.0        42       941        98
VIS    2025250     20200   17.6000  147.1400       9.8        42       929        98
VIS    2025250     20200   17.6200  147.1100       9.7        43       926        99
VIS    2025250     20200   17.6200  147.0900       9.6        44       926        98
VIS    2025250     20200   17.6000  147.0600       9.0        45       946        94
VIS    2025250     20200   17.6000  147.0300       8.9        45       961        97
VIS    2025250     20200   17.6200  147.0000       9.4        45       964        99
VIS    2025250     20200   17.6000  146.9900       9.6        41       970        98
VIS    2025250     20200   17.6000  146.9600       8.7        45       974        98
VIS    2025250     20200   17.6100  146.9300       8.6        46       986        98
VIS    2025250     20200   17.6100  146.8500       9.7        44       977        99
VIS    2025250     20200   17.6200  146.8200       9.4        44       970        99
VIS    2025250     20200   17.6100  146.8000       9.4        44       969        99
VIS    2025250     20200   17.6100  146.7700       9.6        44       958        99
VIS    2025250     20200   17.6100  146.7400       9.7        43       942        99
VIS    2025250     20200   17.6000  146.7100       9.6        42       934       100
VIS    2025250     20200   17.6200  146.7000       9.2        44       959        98
VIS    2025250     20200   17.6000  146.6600       8.8        44       978        97
VIS    2025250     20200   17.6000  146.3600      10.5        44       971        97
VIS    2025250     20200   17.6200  146.3400      10.0        43       968        98
VIS    2025250     20200   17.6100  146.3100      10.1        46       955        98
VIS    2025250     20200   17.6100  146.2800      10.1        47       836        95
VIS    2025250     20200   17.6100  146.2700      10.1        47       836        95
VIS    2025250     20200   17.5900  146.2300      10.3        42       840        94
VIS    2025250     20200   17.6000  146.2200      10.0        44       905       100
VIS    2025250     20200   17.5900  146.1900       9.9        43       931        97
VIS    2025250     20200   17.6100  146.1600      10.7        45       909        97
VIS    2025250     20200   17.6000  146.1300      11.0        45       837        94
VIS    2025250     20200   17.6000  146.1200      10.9        45       821        94
VIS    2025250     20200   17.6000  146.0900      10.8        46       821        94
VIS    2025250     20200   17.6100  146.0600      10.8        45       826        94
VIS    2025250     20200   17.6100  146.0500      10.6        45       835        94
VIS    2025250     20200   17.5900  146.0200      10.1        44       844        94
VIS    2025250     20200   17.6100  145.9900       9.9        45       844        96
VIS    2025250     20200   17.6100  145.9700      10.5        47       850        96
VIS    2025250     20200   17.6100  145.9500      11.0        48       911        98
VIS    2025250     20200   17.6100  145.8800      10.9        48       939        92
VIS    2025250     20200   17.6100  145.8600      11.0        48       936        95
VIS    2025250     20200   17.6000  145.8300      10.2        43       915        98
VIS    2025250     20200   17.5900  145.8100      10.3        37       827        91
VIS    2025250     20200   17.6100  145.7900       9.6        38       818        94
VIS    2025250     20200   17.6000  145.7500       9.3        48       794        96
VIS    2025250     20200   17.6000  145.7400       9.3        50       794        96
VIS    2025250     20200   17.6100  145.7000       9.9        44       823        95
VIS    2025250     20200   17.6100  145.6900       9.9        43       832        95
VIS    2025250     20200   17.5800  143.9200      10.3       101       192        95
VIS    2025250     20200   17.6000  143.8800      10.2        82       196        95
VIS    2025250     20200   17.5700  143.4700      10.6        76       197        95
VIS    2025250     20200   17.5800  143.4700      10.6        76       197        95
VIS    2025250     20200   17.5700  143.1500      15.3        75       194        96
VIS    2025250     20200   17.5900  143.1200      15.9        77       195        95
VIS    2025250     20200   17.6200  149.8400       6.8        71       952        96
VIS    2025250     20200   17.6100  149.8100       7.0        69       945        95
VIS    2025250     20200   17.6300  149.7700       7.4        62       946        96
VIS    2025250     20200   17.6100  149.7400       7.1        68       960        91
VIS    2025250     20200   17.6300  149.7100       7.3        67       946        92
VIS    2025250     20200   17.6100  149.7000       7.0        77       943        90
VIS    2025250     20200   17.5900  147.4700       9.0        42       981        94
VIS    2025250     20200   17.5900  147.4500       9.2        41       963        96
VIS    2025250     20200   17.5800  147.4200       9.1        40       963        97
VIS    2025250     20200   17.6000  147.4100       8.9        42       965        97
VIS    2025250     20200   17.5800  147.3600       9.1        41       968        94
VIS    2025250     20200   17.6000  147.1800       9.9        42       958        95
VIS    2025250     20200   17.6000  147.1700       9.9        42       945        97
VIS    2025250     20200   17.6000  147.1300       9.9        42       924        97
VIS    2025250     20200   17.6000  147.1200      10.0        42       924        97
VIS    2025250     20200   17.5900  147.1000       9.7        42       924        98
VIS    2025250     20200   17.5800  147.0600       9.3        43       933        98
VIS    2025250     20200   17.5800  147.0400       9.4        42       937        99
VIS    2025250     20200   17.5800  147.0300       9.4        41       937        99
VIS    2025250     20200   17.5800  146.9800       9.4        41       956        99
VIS    2025250     20200   17.5800  146.9700       9.1        43       956        99
VIS    2025250     20200   17.5800  146.9400       8.5        48       965        97
VIS    2025250     20200   17.6000  146.9200       9.1        45       989        98
VIS    2025250     20200   17.5800  146.8300       9.7        45       977        98
VIS    2025250     20200   17.6000  146.7900       9.6        46       968        98
VIS    2025250     20200   17.5900  146.7800       9.7        46       961        98
VIS    2025250     20200   17.5900  146.7500      10.2        44       933        99
VIS    2025250     20200   17.5800  146.7300      10.2        41       903        98
VIS    2025250     20200   17.5900  146.7100       9.7        42       926       100
VIS    2025250     20200   17.5900  146.6800       8.7        45       926        99
VIS    2025250     20200   17.5900  146.6600       8.6        45       967        97
VIS    2025250     20200   17.5800  146.3500      11.0        43       971        95
VIS    2025250     20200   17.5800  146.3500      11.0        43       968        96
VIS    2025250     20200   17.5700  146.3200      10.4        46       948        96
VIS    2025250     20200   17.5800  146.2900      10.0        47       941        97
VIS    2025250     20200   17.5800  146.2100       9.8        42       940        98
VIS    2025250     20200   17.5700  146.1800       9.6        42       938        96
VIS    2025250     20200   17.5800  146.1700      10.5        44       929        97
VIS    2025250     20200   17.5900  146.1300      11.1        45       844        94
VIS    2025250     20200   17.5800  146.1100      11.0        46       844        93
VIS    2025250     20200   17.5900  146.1000      10.9        46       821        94
VIS    2025250     20200   17.5700  146.0700      11.2        46       936        96
VIS    2025250     20200   17.5700  146.0300      10.7        44       912        99
VIS    2025250     20200   17.5900  146.0100      10.1        43       848        94
VIS    2025250     20200   17.5800  146.0000       9.7        45       862        95
VIS    2025250     20200   17.5700  145.9800       9.8        47       895        97
VIS    2025250     20200   17.5700  145.9400      10.6        52       916        90
VIS    2025250     20200   17.5700  145.9000       9.9        46       819        92
VIS    2025250     20200   17.5900  145.8700      10.7        48       837        93
VIS    2025250     20200   17.5800  145.7500       9.5        45       790        96
VIS    2025250     20200   17.5600  143.9200      10.6       101       193        96
VIS    2025250     20200   17.5600  143.8800      10.0        85       196        97
VIS    2025250     20200   17.5600  143.4700      10.5        74       197        93
VIS    2025250     20200   17.5600  143.4700      10.2        73       197        95
VIS    2025250     20200   17.5500  143.4300      11.2        76       198        93
VIS    2025250     20200   17.5500  143.1500      15.3        76       191        93
VIS    2025250     20200   17.5500  143.1100      15.3        81       194        97
VIS    2025250     20200   17.5500  143.1000      15.3        82       195        96
VIS    2025250     20200   17.5900  149.8400       7.1        74       951        98
VIS    2025250     20200   17.5900  149.8300       7.3        72       951        99
VIS    2025250     20200   17.6000  149.8100       7.1        69       930        96
VIS    2025250     20200   17.6000  149.7400       6.7        69       968        91
VIS    2025250     20200   17.6000  149.7100       7.0        76       950        94
VIS    2025250     20200   17.5900  149.7000       7.1        80       952        94
VIS    2025250     20200   17.5800  147.4800       8.9        44       981        95
VIS    2025250     20200   17.5700  147.4600       9.2        41       971        96
VIS    2025250     20200   17.5700  147.4400       9.3        41       963        97
VIS    2025250     20200   17.5700  147.4100       9.6        39       955        98
VIS    2025250     20200   17.5700  147.4000       9.3        40       959        96
VIS    2025250     20200   17.5600  147.3800       9.1        39       950        99
VIS    2025250     20200   17.5700  147.1900       9.4        42       981        97
VIS    2025250     20200   17.5700  147.1900       9.4        42       981        98
VIS    2025250     20200   17.5600  147.1500       9.8        43       954        99
VIS    2025250     20200   17.5600  147.1300       9.9        43       938        98
VIS    2025250     20200   17.5700  147.1000       9.5        43       924        99
VIS    2025250     20200   17.5600  147.0800       9.3        42       930        99
VIS    2025250     20200   17.5700  147.0500       9.6        42       937        99
VIS    2025250     20200   17.5500  147.0300      10.2        40       937        99
VIS    2025250     20200   17.5500  147.0000       9.6        41       949       100
VIS    2025250     20200   17.5700  146.9700       9.0        43       956        99
VIS    2025250     20200   17.5600  146.9500       8.9        45       937        98
VIS    2025250     20200   17.5600  146.9200       9.1        46       940        97
VIS    2025250     20200   17.5500  146.9200       9.3        45       940        98
VIS    2025250     20200   17.5500  146.8800       8.8        44       980        98
VIS    2025250     20200   17.5500  146.8700       8.6        44       977        98
VIS    2025250     20200   17.5500  146.8300       8.7        43       977        98
VIS    2025250     20200   17.5500  146.8200       9.1        43       968        98
VIS    2025250     20200   17.5500  146.7800       9.9        43       940       100
VIS    2025250     20200   17.5700  146.7500      10.3        42       919        99
VIS    2025250     20200   17.5700  146.7500      10.4        42       919        99
VIS    2025250     20200   17.5600  146.7000      10.6        40       836        92
VIS    2025250     20200   17.5500  146.6800      10.2        42       915        97
VIS    2025250     20200   17.5500  146.6600       9.8        43       932        97
VIS    2025250     20200   17.5600  146.3800      10.2        40       978        94
VIS    2025250     20200   17.5600  146.3400      10.7        42       960        96
VIS    2025250     20200   17.5600  146.3300      10.7        43       948        97
VIS    2025250     20200   17.5500  146.3100      10.2        45       941        97
VIS    2025250     20200   17.5600  146.2700      10.1        44       941        99
VIS    2025250     20200   17.5600  146.2000       9.5        41       963        98
VIS    2025250     20200   17.5700  146.1800       9.5        43       939        98
VIS    2025250     20200   17.5500  146.1500      10.4        43       938        98
VIS    2025250     20200   17.5500  146.1200      10.9        44       943        96
VIS    2025250     20200   17.5500  146.1100      11.2        45       912        98
VIS    2025250     20200   17.5500  146.0900      11.3        46       942        95
VIS    2025250     20200   17.5500  146.0500      11.0        44       934        98
VIS    2025250     20200   17.5400  146.0300      10.7        44       914        99
VIS    2025250     20200   17.5600  146.0100      10.0        44       862        96
VIS    2025250     20200   17.5600  145.9900       9.7        46       862        95
VIS    2025250     20200   17.5400  145.9600       9.8        50       835        97
VIS    2025250     20200   17.5600  145.9400      10.3        52       895        92
VIS    2025250     20200   17.5500  145.9200       9.4        51       811        95
VIS    2025250     20200   17.5600  145.9000       9.7        47       819        93
VIS    2025250     20200   17.5600  145.7800      10.4        36       793        91
VIS    2025250     20200   17.5400  143.9300      11.2        93       193        98
VIS    2025250     20200   17.5300  143.9100      12.0        87       193        92
VIS    2025250     20200   17.5400  143.8900      10.8        89       196        98
VIS    2025250     20200   17.5300  143.4400      11.0        69       196        94
VIS    2025250     20200   17.5300  143.1400      15.3        77       191        90
VIS    2025250     20200   17.5300  143.1200      15.1        82       191        95
VIS    2025250     20200   17.5400  142.5800      12.5        89       197        91
VIS    2025250     20200   17.5800  149.8400       7.4        76       952        97
VIS    2025250     20200   17.5800  149.8200       7.7        70       952        98
VIS    2025250     20200   17.5800  149.8100       7.7        66       958        98
VIS    2025250     20200   17.5800  149.7100       7.1        78       960        95
VIS    2025250     20200   17.5400  147.4600       9.8        39       984        96
VIS    2025250     20200   17.5500  147.4400       9.8        40       963        98
VIS    2025250     20200   17.5500  147.4200       9.7        40       946        98
VIS    2025250     20200   17.5400  147.3900       9.4        41       944        99
VIS    2025250     20200   17.5500  147.3700       9.1        39       950        99
VIS    2025250     20200   17.5300  147.3300       9.7        40       968        97
VIS    2025250     20200   17.5500  147.2100       9.6        39       981        97
VIS    2025250     20200   17.5300  147.1800      10.1        41       979        97
VIS    2025250     20200   17.5300  147.1500      10.1        41       962        98
VIS    2025250     20200   17.5500  147.1300       9.9        43       938        98
VIS    2025250     20200   17.5400  147.0900       9.5        41       924        99
VIS    2025250     20200   17.5300  147.0800       9.4        41       925        99
VIS    2025250     20200   17.5300  147.0500       9.8        41       933       100
VIS    2025250     20200   17.5500  147.0300      10.2        40       939       100
VIS    2025250     20200   17.5500  147.0100       9.8        41       949       100
VIS    2025250     20200   17.5400  146.9900       9.7        41       949       100
VIS    2025250     20200   17.5300  146.9500       9.8        40       920        99
VIS    2025250     20200   17.5300  146.9400       9.8        41       931        99
VIS    2025250     20200   17.5500  146.9200       9.5        45       938        98
VIS    2025250     20200   17.5400  146.8800       8.9        44       978        97
VIS    2025250     20200   17.5400  146.8600       8.5        44       959        98
VIS    2025250     20200   17.5500  146.8200       8.7        43       968        99
VIS    2025250     20200   17.5500  146.8000       9.5        44       963        99
VIS    2025250     20200   17.5500  146.7500      10.0        40       919        99
VIS    2025250     20200   17.5300  146.7400      10.4        40       934       100
VIS    2025250     20200   17.5500  146.7200      10.7        39       836        92
VIS    2025250     20200   17.5400  146.6900      10.7        41       920        98
VIS    2025250     20200   17.5300  146.6700      10.6        42       932        98
VIS    2025250     20200   17.5400  146.6500      10.5        41       932        96
VIS    2025250     20200   17.5300  146.6200      10.8        40       954        96
VIS    2025250     20200   17.5400  146.3800      10.0        39       978        97
VIS    2025250     20200   17.5400  146.3400      10.4        41       978        97
VIS    2025250     20200   17.5300  146.3200      10.2        44       942        98
VIS    2025250     20200   17.5200  146.2900       9.8        43       931        96
VIS    2025250     20200   17.5200  146.2700       9.5        43       931        96
VIS    2025250     20200   17.5200  146.2500       9.5        41       936        99
VIS    2025250     20200   17.5300  146.2200       9.9        39       954        98
VIS    2025250     20200   17.5400  146.1500      10.5        43       948        97
VIS    2025250     20200   17.5300  146.1000      10.9        45       961        96
VIS    2025250     20200   17.5400  146.0700      11.1        45       944        96
VIS    2025250     20200   17.5200  146.0600      10.9        43       957        96
VIS    2025250     20200   17.5400  146.0400      10.8        44       928        98
VIS    2025250     20200   17.5200  146.0000       9.9        45       915       100
VIS    2025250     20200   17.5300  145.9600       9.3        50       835        98
VIS    2025250     20200   17.5400  145.9200       9.1        52       811        97
VIS    2025250     20200   17.5200  145.9100       8.9        53       833        95
VIS    2025250     20200   17.5400  145.8800       9.5        49       819        98
VIS    2025250     20200   17.5200  143.9100      12.3        85       193        91
VIS    2025250     20200   17.5100  143.4800      11.5        78       194        94
VIS    2025250     20200   17.5100  143.4600      11.1        73       193        95
VIS    2025250     20200   17.5100  143.4300      10.6        71       194        93
VIS    2025250     20200   17.5100  143.4200      10.5        71       194        95
VIS    2025250     20200   17.5000  143.2700      10.6        77       199        95
VIS    2025250     20200   17.5000  143.1700      15.3        75       194        95
VIS    2025250     20200   17.5000  143.1600      15.2        75       193        95
VIS    2025250     20200   17.5000  143.1300      15.0        77       191        92
VIS    2025250     20200   17.5000  143.1100      13.8        81       193        97
VIS    2025250     20200   17.5000  142.9500      13.8        85       194        95
VIS    2025250     20200   17.5000  142.9400      13.7        85       194        94
VIS    2025250     20200   17.5000  142.6700       9.9        81       194        90
VIS    2025250     20200   17.5500  149.8200       7.8        68       977        98
VIS    2025250     20200   17.5500  149.7900       7.3        62       981        95
VIS    2025250     20200   17.5400  149.7700       6.6        65       978        94
VIS    2025250     20200   17.5500  149.7500       6.2        65       944        90
VIS    2025250     20200   17.5400  149.7100       6.8        78       954        95
VIS    2025250     20200   17.5300  149.6800       7.4        82       971        94
VIS    2025250     20200   17.5100  147.5000       9.2        44       973        95
VIS    2025250     20200   17.5100  147.4400       9.8        46       981        97
VIS    2025250     20200   17.5200  147.3600       9.4        39       950        99
VIS    2025250     20200   17.5300  147.3600       9.4        38       950        99
VIS    2025250     20200   17.5300  147.1800      10.3        40       993        97
VIS    2025250     20200   17.5300  147.1600      10.3        41       978        97
VIS    2025250     20200   17.5200  147.1500      10.3        41       962        96
VIS    2025250     20200   17.5200  147.1200       9.9        42       934        97
VIS    2025250     20200   17.5200  147.0900       9.4        42       925        99
VIS    2025250     20200   17.5200  147.0500       9.6        41       930        99
VIS    2025250     20200   17.5100  147.0400       9.7        40       933       100
VIS    2025250     20200   17.5100  147.0100      10.0        40       949       100
VIS    2025250     20200   17.5200  146.9800      10.0        40       949       100
VIS    2025250     20200   17.5100  146.9700      10.1        39       949        99
VIS    2025250     20200   17.5200  146.9400      10.1        39       918        98
VIS    2025250     20200   17.5100  146.9200      10.0        40       938        99
VIS    2025250     20200   17.5200  146.8900       9.7        43       959        98
VIS    2025250     20200   17.5100  146.8800       9.5        44       959        98
VIS    2025250     20200   17.5100  146.8400       8.9        43       959        99
VIS    2025250     20200   17.5000  146.8200       8.8        44       966        99
VIS    2025250     20200   17.5200  146.7800       9.5        43       968        98
VIS    2025250     20200   17.5200  146.7700       9.9        42       968        99
VIS    2025250     20200   17.5100  146.7400      10.1        41       943        99
VIS    2025250     20200   17.5100  146.7300      10.0        42       943        99
VIS    2025250     20200   17.5100  146.6900      10.4        43       947        96
VIS    2025250     20200   17.5100  146.6700      10.5        44       923        99
VIS    2025250     20200   17.5100  146.6600      10.4        42       922        98
VIS    2025250     20200   17.5100  146.6300      10.2        41       947        97
VIS    2025250     20200   17.5000  146.5900       9.5        44       955        92
VIS    2025250     20200   17.5000  146.5800       9.1        43       955        92
VIS    2025250     20200   17.5000  146.5400       9.0        41       944        94
VIS    2025250     20200   17.5000  146.5300       9.6        43       944        96
VIS    2025250     20200   17.5200  146.3500      10.0        40       983        95
VIS    2025250     20200   17.5000  146.3300       9.9        43       981        93
VIS    2025250     20200   17.5000  146.3100      10.2        42       958        95
VIS    2025250     20200   17.5100  146.2800       9.7        43       931        94
VIS    2025250     20200   17.5000  146.2700       9.6        42       920        96
VIS    2025250     20200   17.5100  146.2400       9.2        38       936        99
VIS    2025250     20200   17.5000  146.2200       9.5        35       939       100
VIS    2025250     20200   17.5100  146.0600      10.6        42       957        97
VIS    2025250     20200   17.5100  146.0500      10.7        42       957        97
VIS    2025250     20200   17.5100  146.0100      10.2        44       915       100
VIS    2025250     20200   17.5100  146.0100      10.1        44       915       100
VIS    2025250     20200   17.4900  145.9600       9.0        55       942        93
VIS    2025250     20200   17.4900  145.9600       9.0        54       942        93
VIS    2025250     20200   17.5000  145.9100       8.7        52       834        92
VIS    2025250     20200   17.4900  145.9000       8.7        53       834        94
VIS    2025250     20200   17.5100  145.8800       9.5        53       833        95
VIS    2025250     20200   17.5000  143.4900      12.1        81       197        91
VIS    2025250     20200   17.5000  143.4500      11.8        74       193        94
VIS    2025250     20200   17.5000  143.2700      10.8        75       199        95
VIS    2025250     20200   17.4800  143.1800      15.3        77       194        93
VIS    2025250     20200   17.4900  143.1500      15.2        75       193        96
VIS    2025250     20200   17.4900  143.1300      15.0        77       191        93
VIS    2025250     20200   17.4900  143.1100      12.6        79       193        97
VIS    2025250     20200   17.4900  142.9500      13.8        84       194        94
VIS    2025250     20200   17.4900  142.9300      13.8        84       194        93
VIS    2025250     20200   17.4800  142.6700      10.7        73       196        94
VIS    2025250     20200   17.4800  141.5100      12.4       127       194        90
VIS    2025250     20200   17.4700  141.4900      11.8       135       194        91
VIS    2025250     20200   17.5200  149.8300       7.0        72       985        94
VIS    2025250     20200   17.5100  149.8000       7.2        70       966        96
VIS    2025250     20200   17.5100  149.7800       6.8        70       966        92
VIS    2025250     20200   17.5300  149.7500       6.5        70       933        97
VIS    2025250     20200   17.4900  147.5600      10.5        46       988        93
VIS    2025250     20200   17.4800  147.4500       9.9        46       971        95
VIS    2025250     20200   17.4800  147.4200       9.7        47       973        92
VIS    2025250     20200   17.4800  147.4200       9.6        47       973        92
VIS    2025250     20200   17.5000  147.3700       9.4        40       938        98
VIS    2025250     20200   17.4800  147.1800      10.1        42       978        97
VIS    2025250     20200   17.4800  147.1600       9.9        41       959        98
VIS    2025250     20200   17.4900  147.1500      10.1        41       959        99
VIS    2025250     20200   17.4900  147.1300      10.0        42       934        98
VIS    2025250     20200   17.4900  147.0800       9.1        42       925        97
VIS    2025250     20200   17.4900  147.0700       9.2        42       925        98
VIS    2025250     20200   17.4900  147.0400       9.8        39       934       100
VIS    2025250     20200   17.4800  147.0300       9.8        39       946       100
VIS    2025250     20200   17.5000  147.0000      10.2        39       960        99
VIS    2025250     20200   17.5000  146.9700      10.4        40       956        98
VIS    2025250     20200   17.4900  146.9400      10.2        40       932        99
VIS    2025250     20200   17.4900  146.9300       9.9        41       945        99
VIS    2025250     20200   17.4900  146.9100       9.4        41       956        99
VIS    2025250     20200   17.5000  146.8900       9.6        43       959        98
VIS    2025250     20200   17.5000  146.8600       9.6        45       959        99
VIS    2025250     20200   17.5000  146.8200       9.1        45       966        99
VIS    2025250     20200   17.4900  146.8100       9.3        45       969        99
VIS    2025250     20200   17.4900  146.7800       9.9        46       968        98
VIS    2025250     20200   17.5000  146.7600      10.2        44       958        98
VIS    2025250     20200   17.4800  146.7200       9.7        44       907        95
VIS    2025250     20200   17.4800  146.7100       9.7        44       907        96
VIS    2025250     20200   17.4800  146.6700       9.9        44       909       100
VIS    2025250     20200   17.5000  146.6700      10.3        43       920       100
VIS    2025250     20200   17.4800  146.6300       9.5        45       926        98
VIS    2025250     20200   17.4800  146.6100       9.3        45       935        97
VIS    2025250     20200   17.5000  146.5900       9.4        45       955        92
VIS    2025250     20200   17.4900  146.5500       9.2        42       928        97
VIS    2025250     20200   17.4800  146.5300       9.5        42       928        97
VIS    2025250     20200   17.4800  146.5100       9.5        43       948        93
VIS    2025250     20200   17.4900  146.3100      10.4        40       956        92
VIS    2025250     20200   17.4800  146.2900      10.2        41       951        97
VIS    2025250     20200   17.4700  146.2600       9.5        40       800        91
VIS    2025250     20200   17.4700  146.2500       9.4        37       800        91
VIS    2025250     20200   17.4700  146.0100      10.3        45       979        96
VIS    2025250     20200   17.4900  145.9700       9.1        54       950        93
VIS    2025250     20200   17.4800  145.9500       9.2        54       960        91
VIS    2025250     20200   17.4900  145.9100       8.5        49       834        94
VIS    2025250     20200   17.4900  145.8900       8.8        52       834        94
VIS    2025250     20200   17.4700  143.4400      12.3        70       195        92
VIS    2025250     20200   17.4500  143.3600      12.0        82       195        90
VIS    2025250     20200   17.4600  143.3300      12.8        68       197        90
VIS    2025250     20200   17.4700  143.1800      15.3        77       194        92
VIS    2025250     20200   17.4600  143.1600      15.0        73       193        93
VIS    2025250     20200   17.4600  143.1100      13.4        77       195        96
VIS    2025250     20200   17.4700  142.6700      10.6        73       194        96
VIS    2025250     20200   17.4600  141.4900      11.8       135       194        91
VIS    2025250     20200   17.4500  141.3600      13.7       126       194        91
VIS    2025250     20200   17.4900  149.8200       7.3        66       985        98
VIS    2025250     20200   17.4900  149.8100       7.6        68       985        99
VIS    2025250     20200   17.4900  149.7700       6.7        71       959        91
VIS    2025250     20200   17.4800  149.7600       6.4        71       918        95
VIS    2025250     20200   17.4900  149.6700       7.4        67       985        92
VIS    2025250     20200   17.4900  148.5900      10.3        46       981        91
VIS    2025250     20200   17.4800  147.5700       9.7        49       988        94
VIS    2025250     20200   17.4700  147.4700       9.6        43       970        98
VIS    2025250     20200   17.4600  147.4300       9.7        45       970        91
VIS    2025250     20200   17.4800  147.4200       9.5        46       971        92
VIS    2025250     20200   17.4600  147.3900       9.4        45       952        98
VIS    2025250     20200   17.4800  147.1800      10.2        42       975        96
VIS    2025250     20200   17.4600  147.1800      10.0        43       959        97
VIS    2025250     20200   17.4800  147.1500       9.9        42       959        97
VIS    2025250     20200   17.4600  147.1100       9.8        41       929        99
VIS    2025250     20200   17.4700  147.1000       9.8        41       929        99
VIS    2025250     20200   17.4600  147.0600      10.2        40       935        99
VIS    2025250     20200   17.4600  147.0500      10.1        40       946       100
VIS    2025250     20200   17.4700  147.0200       9.8        40       949       100
VIS    2025250     20200   17.4600  146.9900      10.8        42       952        98
VIS    2025250     20200   17.4600  146.9600      10.8        43       952        97
VIS    2025250     20200   17.4500  146.9400      10.2        43       952        98
VIS    2025250     20200   17.4700  146.8900       9.2        41       962        99
VIS    2025250     20200   17.4700  146.8800       9.4        42       962        99
VIS    2025250     20200   17.4700  146.8500       9.8        45       962        99
VIS    2025250     20200   17.4700  146.8200       9.6        48       966        98
VIS    2025250     20200   17.4700  146.8100       9.6        48       966        98
VIS    2025250     20200   17.4500  146.7700      10.1        46       934        95
VIS    2025250     20200   17.4600  146.7400      10.1        45       907        94
VIS    2025250     20200   17.4500  146.7200      10.2        44       897        95
VIS    2025250     20200   17.4600  146.7100      10.0        44       903        96
VIS    2025250     20200   17.4600  146.6800       9.9        43       852        96
VIS    2025250     20200   17.4700  146.6600       9.8        44       909       100
VIS    2025250     20200   17.4500  146.6200       9.6        45       925        98
VIS    2025250     20200   17.4600  146.6100       9.5        45       925        98
VIS    2025250     20200   17.4500  146.5700       9.5        46       838        91
VIS    2025250     20200   17.4600  146.5600       9.7        43       840        92
VIS    2025250     20200   17.4600  146.5400       9.6        41       907        96
VIS    2025250     20200   17.4700  146.5100       9.3        42       928        96
VIS    2025250     20200   17.4600  146.2900      10.4        40       951        98
VIS    2025250     20200   17.4700  146.2300       9.6        35       813        91
VIS    2025250     20200   17.4600  146.2000      10.4        34       934        97
VIS    2025250     20200   17.4500  146.1800      10.3        36       985        97
VIS    2025250     20200   17.4700  146.0200      10.3        45       979        96
VIS    2025250     20200   17.4700  146.0100      10.3        45       979        96
VIS    2025250     20200   17.4500  145.9800      10.4        43       969        95
VIS    2025250     20200   17.4600  145.9500       9.7        48       961        95
VIS    2025250     20200   17.4600  145.9400       9.6        47       961        95
VIS    2025250     20200   17.4500  143.3500      12.1        81       195        91
VIS    2025250     20200   17.4400  143.3200      12.3        68       196        91
VIS    2025250     20200   17.4200  141.3500      12.8       131       194        94
VIS    2025250     20200   17.4300  141.3300      13.2       129       196        94
VIS    2025250     20200   17.4700  149.8300       7.4        66       984        99
VIS    2025250     20200   17.4600  149.8100       7.3        67       984        99
VIS    2025250     20200   17.4700  149.7800       6.7        68       962        94
VIS    2025250     20200   17.4600  149.7700       6.4        66       962        96
VIS    2025250     20200   17.4600  148.6000       9.7        48       981        91
VIS    2025250     20200   17.4500  148.5700       9.5        48       975        93
VIS    2025250     20200   17.4500  148.5500       9.5        48       974        92
VIS    2025250     20200   17.4400  147.4700       9.8        43       975        97
VIS    2025250     20200   17.4500  147.3900       9.5        45       952        98
VIS    2025250     20200   17.4500  147.3800       9.6        45       952        98
VIS    2025250     20200   17.4300  147.3600       9.9        46       972        97
VIS    2025250     20200   17.4500  147.3400      10.0        41       978        98
VIS    2025250     20200   17.4500  147.1700      10.0        43       959        97
VIS    2025250     20200   17.4400  147.1500      10.1        43       946        98
VIS    2025250     20200   17.4500  147.1400      10.0        43       940        99
VIS    2025250     20200   17.4500  147.1100       9.9        42       936       100
VIS    2025250     20200   17.4500  147.0800      10.1        40       929        99
VIS    2025250     20200   17.4500  147.0500      10.2        40       940       100
VIS    2025250     20200   17.4500  147.0500      10.1        40       948        99
VIS    2025250     20200   17.4500  147.0100      10.4        43       958        99
VIS    2025250     20200   17.4300  146.9800      10.8        44       958        97
VIS    2025250     20200   17.4400  146.9500      10.5        44       956        97
VIS    2025250     20200   17.4300  146.9300      10.2        44       959        96
VIS    2025250     20200   17.4300  146.9000      10.0        44       968        99
VIS    2025250     20200   17.4300  146.8800       9.8        43       972        99
VIS    2025250     20200   17.4300  146.8500      10.0        45       976        97
VIS    2025250     20200   17.4400  146.8100       9.4        49       959        95
VIS    2025250     20200   17.4400  146.8000       9.5        49       959        94
VIS    2025250     20200   17.4400  146.7600      10.1        45       915        95
VIS    2025250     20200   17.4300  146.7500       9.9        43       907        97
VIS    2025250     20200   17.4400  146.7300       9.9        43       897        95
VIS    2025250     20200   17.4500  146.6900      10.0        43       846        95
VIS    2025250     20200   17.4400  146.6600       9.6        43       844        96
VIS    2025250     20200   17.4500  146.6600       9.5        43       846        96
VIS    2025250     20200   17.4500  146.6200       9.5        46       925        98
VIS    2025250     20200   17.4400  146.6000       9.3        48       912        98
VIS    2025250     20200   17.4300  146.5800       9.3        48       822        92
VIS    2025250     20200   17.4300  146.5500      10.0        45       826        91
VIS    2025250     20200   17.4300  146.5200      10.0        41       897        94
VIS    2025250     20200   17.4300  146.5000       9.2        42       922        93
VIS    2025250     20200   17.4300  146.4700       8.5        40       936        93
VIS    2025250     20200   17.4400  146.4500       8.6        37       942        95
VIS    2025250     20200   17.4300  146.2900      10.1        43       943        98
VIS    2025250     20200   17.4300  146.2800      10.2        43       931        99
VIS    2025250     20200   17.4200  146.1700      10.8        35       971        96
VIS    2025250     20200   17.4300  146.0200      11.1        35       984        94
VIS    2025250     20200   17.4300  145.9900      10.8        39       969        97
VIS    2025250     20200   17.4200  145.9800      10.7        39       961        97
VIS    2025250     20200   17.4300  145.9500      10.0        49       937        96
VIS    2025250     20200   17.4200  145.9300       9.5        53       802        98
VIS    2025250     20200   17.4200  143.3500      12.3        78       195        90
VIS    2025250     20200   17.4200  143.3300      12.1        71       195        91
VIS    2025250     20200   17.4200  143.3100      12.4        68       195        91
VIS    2025250     20200   17.4400  149.8400       7.6        59       975        95
VIS    2025250     20200   17.4600  149.8200       7.4        66       984        99
VIS    2025250     20200   17.4600  149.8100       7.6        66       977        98
VIS    2025250     20200   17.4600  149.7700       6.4        66       962        97
VIS    2025250     20200   17.4500  149.7500       5.7        67       921        96
VIS    2025250     20200   17.4200  148.6100       9.6        50       977        90
VIS    2025250     20200   17.4400  148.5900       9.4        49       977        93
VIS    2025250     20200   17.4300  148.5700       9.5        47       975        97
VIS    2025250     20200   17.4100  147.4800       8.6        48       974        95
VIS    2025250     20200   17.4100  147.4700       8.7        47       974        97
VIS    2025250     20200   17.4300  147.4300       9.8        44       958        98
VIS    2025250     20200   17.4300  147.4200       9.8        44       937        99
VIS    2025250     20200   17.4200  147.4000       9.9        45       937        98
VIS    2025250     20200   17.4300  147.3600       9.9        46       972        97
VIS    2025250     20200   17.4300  147.3500      10.0        45       972        97
VIS    2025250     20200   17.4200  147.3300      10.4        44       977        94
VIS    2025250     20200   17.4100  147.2800      10.3        46       970        97
VIS    2025250     20200   17.4100  147.2700      10.4        46       970        97
VIS    2025250     20200   17.4300  147.2500      10.1        46       972        93
VIS    2025250     20200   17.4100  147.2300       9.5        44       986        95
VIS    2025250     20200   17.4100  147.1900       9.4        44       967        99
VIS    2025250     20200   17.4100  147.1800       9.6        43       959        99
VIS    2025250     20200   17.4100  147.1500       9.8        43       945        99
VIS    2025250     20200   17.4200  147.1300      10.0        42       937        99
VIS    2025250     20200   17.4100  147.1000      10.0        41       935        99
VIS    2025250     20200   17.4100  147.0800       9.9        39       937        99
VIS    2025250     20200   17.4300  147.0400      10.1        39       953        98
VIS    2025250     20200   17.4200  147.0300      10.5        38       959        97
VIS    2025250     20200   17.4100  147.0100      10.7        39       963        96
VIS    2025250     20200   17.4200  146.9800      10.5        44       960        96
VIS    2025250     20200   17.4200  146.9600      10.4        44       960        96
VIS    2025250     20200   17.4300  146.9200      10.2        45       964        96
VIS    2025250     20200   17.4200  146.9000      10.1        45       970        98
VIS    2025250     20200   17.4100  146.8800      10.3        43       974        96
VIS    2025250     20200   17.4000  146.8500      10.7        43       966        98
VIS    2025250     20200   17.4100  146.8200      10.1        44       946        99
VIS    2025250     20200   17.4100  146.8200      10.1        44       944        99
VIS    2025250     20200   17.4100  146.7700      10.5        44       912        99
VIS    2025250     20200   17.4200  146.7500       9.9        43       906        98
VIS    2025250     20200   17.4200  146.7400       9.8        43       897        98
VIS    2025250     20200   17.4100  146.7100       9.6        42       803        92
VIS    2025250     20200   17.4200  146.6800      10.1        42       801        91
VIS    2025250     20200   17.4200  146.6600       9.7        42       805        92
VIS    2025250     20200   17.4200  146.6400       9.5        44       832        94
VIS    2025250     20200   17.4000  146.6100       9.5        45       822        93
VIS    2025250     20200   17.4100  146.6000       9.5        45       822        94
VIS    2025250     20200   17.4200  146.5700       9.8        45       817        92
VIS    2025250     20200   17.4100  146.5400      10.3        43       826        91
VIS    2025250     20200   17.4200  146.5200      10.2        41       897        94
VIS    2025250     20200   17.4200  146.4900       9.3        44       907        92
VIS    2025250     20200   17.4200  146.4600       8.0        37       913        94
VIS    2025250     20200   17.4200  146.2900      10.3        44       943        98
VIS    2025250     20200   17.4000  146.2600      10.7        45       936        97
VIS    2025250     20200   17.4000  146.2600      10.6        44       848        94
VIS    2025250     20200   17.4100  146.2100      10.3        38       839        90
VIS    2025250     20200   17.4000  146.2000      10.2        37       839        90
VIS    2025250     20200   17.4200  146.1800      10.8        35       971        96
VIS    2025250     20200   17.4000  146.1600      10.2        40       935        99
VIS    2025250     20200   17.4000  146.1300      10.4        42       948        96
VIS    2025250     20200   17.4100  146.0100      10.2        39       971        92
VIS    2025250     20200   17.4200  145.9800      10.7        40       944        97
VIS    2025250     20200   17.3800  143.4400      11.5        61       195        90
VIS    2025250     20200   17.3900  143.4200      12.0        69       195        91
VIS    2025250     20200   17.3800  143.0900      11.1       104       192        93
VIS    2025250     20200   17.4300  149.7700       6.6        62       924        98
VIS    2025250     20200   17.4300  149.6000       7.8        75       992        95
VIS    2025250     20200   17.4100  148.6100       9.7        51       977        92
VIS    2025250     20200   17.4000  148.6100       9.8        50       971        91
VIS    2025250     20200   17.3900  147.4700       8.9        46       974        98
VIS    2025250     20200   17.4000  147.4500       9.2        45       974        99
VIS    2025250     20200   17.3900  147.4400       9.4        45       974        98
VIS    2025250     20200   17.4000  147.4000       9.5        49       968        94
VIS    2025250     20200   17.4000  147.3700       9.3        47       968        96
VIS    2025250     20200   17.3900  147.3600       9.5        46       961        96
VIS    2025250     20200   17.4000  147.3300      10.0        45       977        95
VIS    2025250     20200   17.3900  147.3000      10.3        45       970        94
VIS    2025250     20200   17.4000  147.2700      10.3        45       970        96
VIS    2025250     20200   17.4000  147.2700      10.4        46       970        96
VIS    2025250     20200   17.3900  147.2400       9.9        44       977        95
VIS    2025250     20200   17.4000  147.2100       9.6        45       970        98
VIS    2025250     20200   17.4000  147.1800       9.6        44       963        99
VIS    2025250     20200   17.3900  147.1600       9.7        43       950        99
VIS    2025250     20200   17.3900  147.1300       9.9        41       941        99
VIS    2025250     20200   17.3900  147.1200      10.0        41       941        98
VIS    2025250     20200   17.3900  147.0800      10.2        38       937        98
VIS    2025250     20200   17.4000  147.0600      10.1        37       938        99
VIS    2025250     20200   17.4000  147.0300      10.6        36       953        98
VIS    2025250     20200   17.4000  147.0100      10.5        38       955        98
VIS    2025250     20200   17.4000  147.0000      10.5        40       955        97
VIS    2025250     20200   17.3900  146.9600      10.1        41       940        98
VIS    2025250     20200   17.3900  146.9300      10.0        45       956        97
VIS    2025250     20200   17.3900  146.9300       9.9        45       960        97
VIS    2025250     20200   17.3900  146.8800      10.2        43       970        98
VIS    2025250     20200   17.4000  146.8600      10.9        42       966        98
VIS    2025250     20200   17.4000  146.8500      10.8        42       966        98
VIS    2025250     20200   17.4000  146.8200      10.4        43       943        99
VIS    2025250     20200   17.4000  146.7900      10.3        45       917        99
VIS    2025250     20200   17.3900  146.7600      10.5        43       909        98
VIS    2025250     20200   17.3900  146.7400      10.4        43       803        90
VIS    2025250     20200   17.4000  146.7300      10.1        43       803        91
VIS    2025250     20200   17.3800  146.5900       9.9        41       805        91
VIS    2025250     20200   17.3900  146.5900       9.9        42       815        93
VIS    2025250     20200   17.3900  146.5400       9.8        42       806        91
VIS    2025250     20200   17.3800  146.4600       9.4        40       810        90
VIS    2025250     20200   17.4000  146.4400       9.3        32       812        90
VIS    2025250     20200   17.3800  146.2700      10.9        45       936        97
VIS    2025250     20200   17.3900  146.2600      10.7        45       936        98
VIS    2025250     20200   17.3800  146.2300      10.1        39       801        94
VIS    2025250     20200   17.3800  146.2100       9.8        37       801        94
VIS    2025250     20200   17.3900  146.1900      10.1        37       840        91
VIS    2025250     20200   17.3800  146.1700       9.7        38       839        92
VIS    2025250     20200   17.3900  146.1300      10.2        43       948        93
VIS    2025250     20200   17.3700  146.0800      10.1        41       985        93
VIS    2025250     20200   17.3700  146.0600       9.9        42       979        96
VIS    2025250     20200   17.3700  146.0500      10.0        42       979        96
VIS    2025250     20200   17.3900  146.0100       9.5        41       944        94
VIS    2025250     20200   17.3700  143.4100      11.5        70       195        90
VIS    2025250     20200   17.3700  148.6300       9.7        52       977        93
VIS    2025250     20200   17.3700  148.5900       9.9        48       983        96
VIS    2025250     20200   17.3800  147.4700       8.9        46       974        98
VIS    2025250     20200   17.3800  147.4500       9.4        46       975        98
VIS    2025250     20200   17.3600  147.4200       9.7        48       968        94
VIS    2025250     20200   17.3700  147.3800       9.5        49       959        95
VIS    2025250     20200   17.3600  147.3500       9.7        48       948        95
VIS    2025250     20200   17.3700  147.3400       9.8        47       961        95
VIS    2025250     20200   17.3700  147.3200      10.1        46       961        96
VIS    2025250     20200   17.3600  147.2800      10.3        43       955        94
VIS    2025250     20200   17.3600  147.2600      10.3        43       959        93
VIS    2025250     20200   17.3600  147.2400      10.0        44       963        96
VIS    2025250     20200   17.3600  147.2000       9.4        42       964        99
VIS    2025250     20200   17.3600  147.1900       9.4        42       964        99
VIS    2025250     20200   17.3700  147.1600       9.7        41       960       100
VIS    2025250     20200   17.3600  147.1400      10.0        41       945        99
VIS    2025250     20200   17.3600  147.1200      10.0        41       941        99
VIS    2025250     20200   17.3600  147.0900       9.8        40       936        99
VIS    2025250     20200   17.3600  147.0600      10.0        38       938        99
VIS    2025250     20200   17.3700  147.0400      10.2        38       946        99
VIS    2025250     20200   17.3700  147.0200      10.5        39       946        99
VIS    2025250     20200   17.3600  146.9900      10.3        39       944        99
VIS    2025250     20200   17.3600  146.9600      10.3        40       940        99
VIS    2025250     20200   17.3700  146.9500      10.2        40       940        99
VIS    2025250     20200   17.3800  146.9300      10.0        44       940        99
VIS    2025250     20200   17.3600  146.9000      10.2        45       963        99
VIS    2025250     20200   17.3600  146.8800      10.4        46       963        98
VIS    2025250     20200   17.3600  146.8500      10.9        46       941        98
VIS    2025250     20200   17.3600  146.8100      10.6        43       936        98
VIS    2025250     20200   17.3600  146.8000      10.4        44       917        98
VIS    2025250     20200   17.3700  146.7700      10.7        44       910        97
VIS    2025250     20200   17.3700  146.7500      11.0        44       907        97
VIS    2025250     20200   17.3500  146.6100      10.2        41       798        90
VIS    2025250     20200   17.3700  146.5700       9.7        40       799        91
VIS    2025250     20200   17.3700  146.5500       9.4        39       799        92
VIS    2025250     20200   17.3700  146.5400       9.5        40       798        91
VIS    2025250     20200   17.3700  146.4700       9.7        39       810        90
VIS    2025250     20200   17.3700  146.4400       9.6        40       798        90
VIS    2025250     20200   17.3500  146.3500       8.6        40       980        94
VIS    2025250     20200   17.3700  146.3100      10.7        46       955        93
VIS    2025250     20200   17.3700  146.2900      10.8        46       936        94
VIS    2025250     20200   17.3700  146.2500      10.3        41       801        94
VIS    2025250     20200   17.3700  146.2300       9.9        38       800        91
VIS    2025250     20200   17.3500  146.2000       9.4        38       800        91
VIS    2025250     20200   17.3700  146.1700       9.4        38       839        90
VIS    2025250     20200   17.3500  146.1400       9.4        34       918        94
VIS    2025250     20200   17.3500  146.1100       9.5        35       952        93
VIS    2025250     20200   17.3700  146.0900      10.3        41       987        96
VIS    2025250     20200   17.3600  146.0600       9.8        41       979        95
VIS    2025250     20200   17.3500  146.0500      10.0        39       979        98
VIS    2025250     20200   17.3400  143.4600      12.0        70       194        91
VIS    2025250     20200   17.3400  143.4400      11.4        67       194        93
VIS    2025250     20200   17.3500  143.4000      10.0        58       195        90
VIS    2025250     20200   17.3300  143.2300      12.9        63       193        92
VIS    2025250     20200   17.3500  148.7200       9.6        51       987        97
VIS    2025250     20200   17.3500  148.6500       9.4        64       979        93
VIS    2025250     20200   17.3700  148.6200      10.0        50       977        94
VIS    2025250     20200   17.3600  148.6000      10.0        47       977        94
VIS    2025250     20200   17.3500  148.5800       9.8        47       974        97
VIS    2025250     20200   17.3500  148.4700       9.9        43       991        93
VIS    2025250     20200   17.3600  148.4300      10.4        46       974        92
VIS    2025250     20200   17.3600  147.4300       9.9        47       979        94
VIS    2025250     20200   17.3600  147.4200       9.8        47       968        93
VIS    2025250     20200   17.3400  147.4000       9.8        45       958        98
VIS    2025250     20200   17.3400  147.3600       9.7        48       958        95
VIS    2025250     20200   17.3400  147.3500       9.7        49       948        95
VIS    2025250     20200   17.3600  147.3100      10.3        45       959        96
VIS    2025250     20200   17.3500  147.3000      10.3        43       959        96
VIS    2025250     20200   17.3500  147.2700      10.2        42       955        95
VIS    2025250     20200   17.3500  147.2400      10.1        44       946        96
VIS    2025250     20200   17.3500  147.2200       9.7        43       963        98
VIS    2025250     20200   17.3500  147.1900       9.4        41       963        99
VIS    2025250     20200   17.3400  147.1600       9.7        40       945       100
VIS    2025250     20200   17.3400  147.1600       9.8        40       944       100
VIS    2025250     20200   17.3500  147.1200      10.1        41       939        99
VIS    2025250     20200   17.3500  147.1000       9.8        40       936        99
VIS    2025250     20200   17.3500  147.0800       9.5        40       936        99
VIS    2025250     20200   17.3500  147.0600       9.5        40       939        99
VIS    2025250     20200   17.3300  147.0200       9.7        38       945        99
VIS    2025250     20200   17.3300  147.0100       9.8        38       948        99
VIS    2025250     20200   17.3300  146.9800      10.3        41       948        99
VIS    2025250     20200   17.3400  146.9600      10.5        41       940        99
VIS    2025250     20200   17.3300  146.9200      10.6        42       934        98
VIS    2025250     20200   17.3300  146.9100      10.5        43       936        98
VIS    2025250     20200   17.3500  146.8900      10.3        46       963        98
VIS    2025250     20200   17.3500  146.8600      10.9        48       941        97
VIS    2025250     20200   17.3500  146.8200      10.6        44       944        98
VIS    2025250     20200   17.3500  146.8000      10.2        44       928        98
VIS    2025250     20200   17.3500  146.7800      10.4        44       913        99
VIS    2025250     20200   17.3300  146.7500      10.4        44       913        98
VIS    2025250     20200   17.3400  146.7400      10.6        44       909        97
VIS    2025250     20200   17.3300  146.3900       8.5        39       830        96
VIS    2025250     20200   17.3300  146.3800       8.5        39       948        97
VIS    2025250     20200   17.3500  146.3400       8.5        41       980        94
VIS    2025250     20200   17.3400  146.3100       9.9        43       948        98
VIS    2025250     20200   17.3300  146.3000       9.7        42       944        98
VIS    2025250     20200   17.3500  146.2700      10.1        43       797        90
VIS    2025250     20200   17.3400  146.2500      10.2        38       795        93
VIS    2025250     20200   17.3300  146.2100      10.3        37       800        93
VIS    2025250     20200   17.3300  146.2100      10.0        36       800        92
VIS    2025250     20200   17.3300  146.1700       9.3        35       802        92
VIS    2025250     20200   17.3400  146.1400       9.5        30       912        95
VIS    2025250     20200   17.3300  146.0900      10.6        34       967        98
VIS    2025250     20200   17.3200  146.0700      10.8        34       953        97
VIS    2025250     20200   17.3200  146.0600      10.7        35       948        97
VIS    2025250     20200   17.3300  143.4500      11.7        72       194        94
VIS    2025250     20200   17.3200  143.4200      10.1        62       195        93
VIS    2025250     20200   17.3200  143.4000       9.8        56       195        91
VIS    2025250     20200   17.3100  143.2300      13.2        55       193        90
VIS    2025250     20200   17.3600  149.8500       8.7        53       979        92
VIS    2025250     20200   17.3600  149.8400       8.7        53       979        92
VIS    2025250     20200   17.3400  148.7100       9.4        52       987        95
VIS    2025250     20200   17.3300  148.7100       9.2        53       987        91
VIS    2025250     20200   17.3300  148.6800       9.0        56       979        93
VIS    2025250     20200   17.3400  148.6500       9.4        62       979        95
VIS    2025250     20200   17.3200  148.6200       9.8        50       954        94
VIS    2025250     20200   17.3300  148.6000      10.0        47       944        97
VIS    2025250     20200   17.3300  148.5900       9.9        48       954        98
VIS    2025250     20200   17.3400  148.4700      10.0        44       986        94
VIS    2025250     20200   17.3400  148.4600      10.2        44       986        92
VIS    2025250     20200   17.3100  147.4600       9.7        47       981        97
VIS    2025250     20200   17.3300  147.4300       9.7        44       982        96
VIS    2025250     20200   17.3300  147.4100       9.8        44       972        97
VIS    2025250     20200   17.3300  147.4100       9.9        44       959        98
VIS    2025250     20200   17.3100  147.3700       9.9        46       959        98
VIS    2025250     20200   17.3200  147.3500       9.6        47       948        98
VIS    2025250     20200   17.3200  147.3200       9.7        46       940        98
VIS    2025250     20200   17.3200  147.2900      10.5        46       939        97
VIS    2025250     20200   17.3200  147.2700      10.6        46       941        97
VIS    2025250     20200   17.3300  147.2400      10.5        44       941        98
VIS    2025250     20200   17.3300  147.2200      10.3        43       946        99
VIS    2025250     20200   17.3100  147.2100      10.5        43       945        99
VIS    2025250     20200   17.3200  147.1900      10.1        41       954       100
VIS    2025250     20200   17.3200  147.1600      10.0        42       938        99
VIS    2025250     20200   17.3200  147.1300       9.8        41       930        98
VIS    2025250     20200   17.3100  147.0900       9.9        41       930       100
VIS    2025250     20200   17.3100  147.0900       9.9        41       930       100
VIS    2025250     20200   17.3300  147.0600       9.7        41       930       100
VIS    2025250     20200   17.3200  147.0200       9.9        38       939        99
VIS    2025250     20200   17.3300  147.0100      10.0        38       945        99
VIS    2025250     20200   17.3100  146.9900      10.4        40       945        99
VIS    2025250     20200   17.3100  146.9500      10.8        40       934        97
VIS    2025250     20200   17.3200  146.9300      10.6        40       934        98
VIS    2025250     20200   17.3100  146.9200      10.4        39       930        96
VIS    2025250     20200   17.3300  146.8800      10.3        47       953        98
VIS    2025250     20200   17.3300  146.8600      10.8        47       957        97
VIS    2025250     20200   17.3100  146.8300      10.5        43       956        96
VIS    2025250     20200   17.3100  146.8000       9.3        44       944        98
VIS    2025250     20200   17.3200  146.7900       9.7        44       944       100
VIS    2025250     20200   17.3100  146.7700       9.8        44       940        99
VIS    2025250     20200   17.3300  146.7400      10.3        43       913        97
VIS    2025250     20200   17.3200  146.4500       8.7        30       791        90
VIS    2025250     20200   17.3200  146.4100       8.6        42       793        91
VIS    2025250     20200   17.3200  146.3900       8.4        40       830        97
VIS    2025250     20200   17.3200  146.3800       8.4        40       830        96
VIS    2025250     20200   17.3100  146.3400       9.0        34       968        98
VIS    2025250     20200   17.3100  146.3100       9.9        39       965        96
VIS    2025250     20200   17.3100  146.2900       9.8        40       944        97
VIS    2025250     20200   17.3100  146.2400      10.6        38       795        91
VIS    2025250     20200   17.3100  146.2400      10.6        38       795        91
VIS    2025250     20200   17.3100  146.1900      10.1        36       798        93
VIS    2025250     20200   17.3200  146.1700       9.5        34       800        92
VIS    2025250     20200   17.3200  146.1600       9.4        32       802        92
VIS    2025250     20200   17.3100  146.0700      11.2        33       963        98
VIS    2025250     20200   17.3000  146.0700      11.4        33       963        98
VIS    2025250     20200   17.3000  143.3300      12.0        64       197        91
VIS    2025250     20200   17.3100  148.6800       8.9        53       979        96
VIS    2025250     20200   17.3200  148.6700       9.0        56       979        94
VIS    2025250     20200   17.3100  148.6300       9.4        56       962        97
VIS    2025250     20200   17.3100  148.6100       9.5        52       940        98
VIS    2025250     20200   17.3000  148.5900       9.7        49       938        98
VIS    2025250     20200   17.3000  148.5600      10.9        51       953        96
VIS    2025250     20200   17.3100  148.4900       9.1        50       949        97
VIS    2025250     20200   17.3100  148.4600       9.6        47       949        95
VIS    2025250     20200   17.3100  148.4500       9.8        46       949        95
VIS    2025250     20200   17.3000  147.4900       9.4        49       969        96
VIS    2025250     20200   17.3100  147.4200       9.6        41       975        99
VIS    2025250     20200   17.3100  147.3900       9.8        42       966        99
VIS    2025250     20200   17.3000  147.3700      10.1        45       960        98
VIS    2025250     20200   17.3000  147.3600       9.8        46       953        97
VIS    2025250     20200   17.2900  147.3300       9.9        46       941        99
VIS    2025250     20200   17.3100  147.3000      10.2        47       937        98
VIS    2025250     20200   17.3100  147.2900      10.6        47       937        97
VIS    2025250     20200   17.2900  147.2500      11.0        47       943        96
VIS    2025250     20200   17.3100  147.2200      10.7        45       944        98
VIS    2025250     20200   17.3000  147.2100      10.7        44       944        98
VIS    2025250     20200   17.3000  147.1800      10.5        43       939        99
VIS    2025250     20200   17.2900  147.1600      10.3        44       936        99
VIS    2025250     20200   17.2900  147.1400       9.8        42       934       100
VIS    2025250     20200   17.3000  147.1000       9.9        42       930       100
VIS    2025250     20200   17.3000  147.0900       9.9        42       930       100
VIS    2025250     20200   17.2900  147.0500      10.5        43       944        99
VIS    2025250     20200   17.3000  147.0300      10.6        41       939        99
VIS    2025250     20200   17.3000  147.0200      10.5        39       939        99
VIS    2025250     20200   17.3000  146.9900      11.0        41       945        98
VIS    2025250     20200   17.2800  146.9500      11.0        40       930        97
VIS    2025250     20200   17.2900  146.9300      10.7        37       925        98
VIS    2025250     20200   17.3000  146.9100      10.2        39       913        94
VIS    2025250     20200   17.2900  146.8900      10.2        39       933        95
VIS    2025250     20200   17.2900  146.8600      10.9        39       949        96
VIS    2025250     20200   17.2800  146.8300      10.4        39       941        95
VIS    2025250     20200   17.2800  146.8100       9.5        41       941        95
VIS    2025250     20200   17.3000  146.8000       9.2        44       944        98
VIS    2025250     20200   17.2900  146.7600       9.7        43       934        99
VIS    2025250     20200   17.2800  146.7300       9.4        42       917        99
VIS    2025250     20200   17.3000  146.7200      10.2        42       844        94
VIS    2025250     20200   17.2900  146.4000       8.2        37       796        92
VIS    2025250     20200   17.2900  146.3800       8.3        34       806        92
VIS    2025250     20200   17.2900  146.3200      10.0        38       965        99
VIS    2025250     20200   17.2900  146.2900      10.1        40       944        98
VIS    2025250     20200   17.2800  146.2400      10.5        39       798        90
VIS    2025250     20200   17.2800  146.2200      10.6        38       801        91
VIS    2025250     20200   17.3000  146.2100      10.4        36       801        92
VIS    2025250     20200   17.2800  146.1800      10.1        32       796        91
VIS    2025250     20200   17.2900  146.0900      11.1        30       963        96
VIS    2025250     20200   17.2800  146.0500      10.9        35       965        99
VIS    2025250     20200   17.2700  143.5400      10.6        58       198        92
VIS    2025250     20200   17.3000  148.6900       8.8        50       979        96
VIS    2025250     20200   17.3000  148.6700       8.8        52       970        97
VIS    2025250     20200   17.2900  148.6400       9.1        54       961        96
VIS    2025250     20200   17.2900  148.6200       9.2        53       933        97
VIS    2025250     20200   17.2900  148.5600      10.5        50       946        96
VIS    2025250     20200   17.2700  148.5300       9.5        52       928        98
VIS    2025250     20200   17.2700  148.4900       8.1        47       923        93
VIS    2025250     20200   17.2900  148.4800       8.8        52       924        91
VIS    2025250     20200   17.2700  148.4500       9.0        48       924        96
VIS    2025250     20200   17.2800  148.4300       9.4        47       927        96
VIS    2025250     20200   17.2700  148.3900       8.9        51       947        91
VIS    2025250     20200   17.2800  147.4200       9.7        40       975        96
VIS    2025250     20200   17.2800  147.3900      10.2        44       966        97
VIS    2025250     20200   17.2800  147.3500      10.2        46       953        97
VIS    2025250     20200   17.2800  147.3300      10.0        46       944        98
VIS    2025250     20200   17.2800  147.3200      10.1        45       947        98
VIS    2025250     20200   17.2700  147.2800      10.4        46       941        98
VIS    2025250     20200   17.2800  147.2800      10.9        48       941        96
VIS    2025250     20200   17.2600  147.2500      10.9        47       945        96
VIS    2025250     20200   17.2800  147.2200      10.9        45       941        98
VIS    2025250     20200   17.2800  147.2000      10.8        44       939        98
VIS    2025250     20200   17.2800  147.1600      10.1        44       936        99
VIS    2025250     20200   17.2800  147.1400       9.9        42       936        99
VIS    2025250     20200   17.2700  147.1100      10.1        42       935        99
VIS    2025250     20200   17.2600  147.1000      10.1        42       933       100
VIS    2025250     20200   17.2800  147.0700      10.3        43       944        99
VIS    2025250     20200   17.2800  147.0500      10.5        44       947        99
VIS    2025250     20200   17.2800  147.0200      11.0        44       947        98
VIS    2025250     20200   17.2600  147.0000      10.7        45       959        98
VIS    2025250     20200   17.2600  146.9700      11.0        43       944        98
VIS    2025250     20200   17.2700  146.9400      11.0        39       928        98
VIS    2025250     20200   17.2600  146.9300      11.0        38       928        98
VIS    2025250     20200   17.2800  146.8900      10.5        36       926        96
VIS    2025250     20200   17.2800  146.8900      10.6        37       926        96
VIS    2025250     20200   17.2600  146.8400      11.1        37       916        95
VIS    2025250     20200   17.2800  146.8200       9.9        39       926        94
VIS    2025250     20200   17.2600  146.8000      10.2        38       918        96
VIS    2025250     20200   17.2600  146.7700       9.8        43       932        99
VIS    2025250     20200   17.2600  146.7600       9.6        43       933        99
VIS    2025250     20200   17.2700  146.7300       9.5        43       917       100
VIS    2025250     20200   17.2600  146.7100       9.4        42       913       100
VIS    2025250     20200   17.2600  146.6800       9.8        40       880        97
VIS    2025250     20200   17.2500  146.3800       9.1        29       815        90
VIS    2025250     20200   17.2700  146.3200      10.4        38       965        99
VIS    2025250     20200   17.2500  146.2900      10.6        40       944        97
VIS    2025250     20200   17.2500  146.2300      10.5        38       800        90
VIS    2025250     20200   17.2500  146.1500       9.7        32       798        90
VIS    2025250     20200   17.2500  143.4400      12.0        50       193        93
VIS    2025250     20200   17.2500  143.4100      11.7        44       193        91
VIS    2025250     20200   17.2500  143.3900      10.4        41       192        91
VIS    2025250     20200   17.2300  143.2400      13.2        57       190        91
VIS    2025250     20200   17.2400  142.9900      23.1        68       190        91
VIS    2025250     20200   17.2600  148.6700       9.4        46       971        92
VIS    2025250     20200   17.2600  148.6300       9.0        51       944        98
VIS    2025250     20200   17.2700  148.6100       8.9        50       933        99
VIS    2025250     20200   17.2700  148.5700       9.7        49       949        99
VIS    2025250     20200   17.2700  148.5400       9.8        51       945        99
VIS    2025250     20200   17.2600  148.5100       8.8        47       924        99
VIS    2025250     20200   17.2600  148.4900       8.1        44       924        98
VIS    2025250     20200   17.2500  148.4600       8.5        46       926        93
VIS    2025250     20200   17.2500  148.4500       8.8        48       926        93
VIS    2025250     20200   17.2500  148.4200       9.0        48       930        92
VIS    2025250     20200   17.2700  148.4000       8.9        50       946        90
VIS    2025250     20200   17.2400  147.3900      10.6        45       984        96
VIS    2025250     20200   17.2500  147.3700      10.8        46       973        95
VIS    2025250     20200   17.2500  147.3500      10.7        46       966        96
VIS    2025250     20200   17.2500  147.3200      10.5        44       949        97
VIS    2025250     20200   17.2600  147.3000      10.5        44       941        97
VIS    2025250     20200   17.2500  147.2800      10.5        45       941        97
VIS    2025250     20200   17.2600  147.2400      10.8        47       945        96
VIS    2025250     20200   17.2500  147.2400      10.7        46       945        95
VIS    2025250     20200   17.2400  147.2000       9.9        43       953        97
VIS    2025250     20200   17.2600  147.1900      10.3        43       940        98
VIS    2025250     20200   17.2400  147.1500       9.6        41       937       100
VIS    2025250     20200   17.2400  147.1300       9.8        40       929       100
VIS    2025250     20200   17.2600  147.1100      10.1        41       933       100
VIS    2025250     20200   17.2500  147.0800      10.3        42       935        99
VIS    2025250     20200   17.2500  147.0700      10.5        42       943        99
VIS    2025250     20200   17.2500  147.0400      10.5        45       956        98
VIS    2025250     20200   17.2500  147.0000      10.4        45       963        98
VIS    2025250     20200   17.2400  146.9900      10.1        43       959        99
VIS    2025250     20200   17.2400  146.9700      10.2        42       951        98
VIS    2025250     20200   17.2500  146.9300      11.1        39       928        98
VIS    2025250     20200   17.2500  146.9200      11.1        38       928        98
VIS    2025250     20200   17.2500  146.8800      11.3        34       924        96
VIS    2025250     20200   17.2500  146.8600      11.4        35       915        95
VIS    2025250     20200   17.2400  146.8400      11.2        38       915        95
VIS    2025250     20200   17.2500  146.8100      10.5        37       918        95
VIS    2025250     20200   17.2500  146.8000      10.4        38       918        96
VIS    2025250     20200   17.2300  146.7600       9.9        42       922        96
VIS    2025250     20200   17.2500  146.7300       9.8        42       914       100
VIS    2025250     20200   17.2400  146.7100       9.7        38       911       100
VIS    2025250     20200   17.2400  146.7000       9.7        39       911        99
VIS    2025250     20200   17.2400  146.6700       9.6        41       905        98
VIS    2025250     20200   17.2300  146.6400      10.7        42       898        97
VIS    2025250     20200   17.2300  146.5400      11.4        33       893        94
VIS    2025250     20200   17.2300  146.4900       9.3        38       893        98
VIS    2025250     20200   17.2400  146.4600       9.0        38       893        96
VIS    2025250     20200   17.2400  146.4500       8.7        37       896        94
VIS    2025250     20200   17.2300  146.4400       8.4        35       896        91
VIS    2025250     20200   17.2300  146.4000       9.1        30       898        91
VIS    2025250     20200   17.2400  146.3900       9.2        28       815        90
VIS    2025250     20200   17.2500  146.3000      10.6        40       953        97
VIS    2025250     20200   17.2400  146.2800      10.4        41       927        98
VIS    2025250     20200   17.2400  146.2500       9.9        39       813        90
VIS    2025250     20200   17.2300  146.2300      10.0        39       800        94
VIS    2025250     20200   17.2400  146.1500       9.6        32       798        91
VIS    2025250     20200   17.2500  146.1400       9.6        32       802        92
VIS    2025250     20200   17.2500  145.8800       9.0        37       801        95
VIS    2025250     20200   17.2400  145.8600       8.8        41       801        99
VIS    2025250     20200   17.2300  143.5100      10.5        62       192        98
VIS    2025250     20200   17.2200  143.4200      12.3        55       192        94
VIS    2025250     20200   17.2200  143.4200      12.1        57       193        95
VIS    2025250     20200   17.2200  143.3600      10.2        51       190        93
VIS    2025250     20200   17.2200  143.2800      13.1        56       190        93
VIS    2025250     20200   17.2200  143.2500      13.4        56       190        92
VIS    2025250     20200   17.2300  143.2400      13.3        57       191        94
VIS    2025250     20200   17.2100  143.2300      13.9        53       193        95
VIS    2025250     20200   17.2200  143.1800      11.1        69       194        93
VIS    2025250     20200   17.2400  148.6800       9.1        45       952        94
VIS    2025250     20200   17.2400  148.6800       9.2        46       952        95
VIS    2025250     20200   17.2300  148.6300       9.5        49       937        98
VIS    2025250     20200   17.2300  148.6200       9.6        49       937        98
VIS    2025250     20200   17.2300  148.5800       9.2        51       949        98
VIS    2025250     20200   17.2400  148.5500       9.0        50       960        99
VIS    2025250     20200   17.2500  148.5200       9.1        49       943        98
VIS    2025250     20200   17.2500  148.5000       8.3        44       943        98
VIS    2025250     20200   17.2400  148.4700       8.2        44       938        94
VIS    2025250     20200   17.2400  148.4500       8.5        46       926        91
VIS    2025250     20200   17.2200  148.4200       8.6        49       951        97
VIS    2025250     20200   17.2300  148.4100       8.9        48       951        93
VIS    2025250     20200   17.2200  148.3200       8.9        53       983        97
VIS    2025250     20200   17.2300  147.4000      10.5        44       991        94
VIS    2025250     20200   17.2100  147.3700      10.5        47       976        94
VIS    2025250     20200   17.2200  147.3700      10.7        47       976        94
VIS    2025250     20200   17.2200  147.3300      11.0        46       967        96
VIS    2025250     20200   17.2200  147.3000      10.5        44       945        97
VIS    2025250     20200   17.2100  147.2800      10.3        45       945        96
VIS    2025250     20200   17.2100  147.2600      10.2        45       949        94
VIS    2025250     20200   17.2100  147.2000       9.8        44       956        96
VIS    2025250     20200   17.2200  147.2000       9.8        44       954        97
VIS    2025250     20200   17.2300  147.1500       9.7        43       939        99
VIS    2025250     20200   17.2200  147.1500       9.9        43       939        99
VIS    2025250     20200   17.2200  147.1100      10.1        42       929        99
VIS    2025250     20200   17.2200  147.1000      10.1        42       928        99
VIS    2025250     20200   17.2100  147.0700      10.1        42       928        98
VIS    2025250     20200   17.2200  147.0400      10.2        39       941        96
VIS    2025250     20200   17.2100  147.0200      10.3        38       945        94
VIS    2025250     20200   17.2200  147.0000       9.9        41       954        97
VIS    2025250     20200   17.2100  146.9700      10.2        42       951        98
VIS    2025250     20200   17.2200  146.9400      10.5        41       952        98
VIS    2025250     20200   17.2200  146.9300      10.9        39       942        98
VIS    2025250     20200   17.2300  146.9000      11.2        38       928        97
VIS    2025250     20200   17.2100  146.8600      11.1        40       916        96
VIS    2025250     20200   17.2200  146.8500      11.1        41       916        96
VIS    2025250     20200   17.2200  146.8200      10.8        41       915        95
VIS    2025250     20200   17.2200  146.8100      10.7        41       925        97
VIS    2025250     20200   17.2100  146.7700      10.1        40       922        97
VIS    2025250     20200   17.2300  146.7600      10.0        41       922        95
VIS    2025250     20200   17.2200  146.7400       9.9        40       912        98
VIS    2025250     20200   17.2200  146.7000       9.8        38       910        99
VIS    2025250     20200   17.2100  146.6800       9.9        39       907       100
VIS    2025250     20200   17.2200  146.6500      10.4        40       901        98
VIS    2025250     20200   17.2100  146.6200      11.0        38       898        96
VIS    2025250     20200   17.2100  146.6100      11.1        37       898        95
VIS    2025250     20200   17.2300  146.5800      11.2        38       894        95
VIS    2025250     20200   17.2200  146.5500      11.3        33       894        93
VIS    2025250     20200   17.2200  146.5400      11.3        32       894        92
VIS    2025250     20200   17.2300  146.5000       9.6        37       894        98
VIS    2025250     20200   17.2100  146.4900       9.3        37       895        98
VIS    2025250     20200   17.2300  146.4700       9.0        36       894        98
VIS    2025250     20200   17.2200  146.4000       9.1        29       900        91
VIS    2025250     20200   17.2200  146.3900       9.4        26       903        94
VIS    2025250     20200   17.2200  146.3500       9.6        31       938       100
VIS    2025250     20200   17.2200  146.3500       9.7        32       940       100
VIS    2025250     20200   17.2100  146.2800      10.2        39       953        97
VIS    2025250     20200   17.2200  146.2600       9.9        40       916        99
VIS    2025250     20200   17.2100  146.2300       9.9        40       802        96
VIS    2025250     20200   17.2200  146.2300      10.0        39       800        95
VIS    2025250     20200   17.2100  146.1400       9.9        32       798        91
VIS    2025250     20200   17.2200  146.1200       9.2        31       814        92
VIS    2025250     20200   17.2200  146.0300      10.5        38       972        96
VIS    2025250     20200   17.2200  145.8900       9.7        40       794        95
VIS    2025250     20200   17.2100  145.8500       9.2        36       789        93
VIS    2025250     20200   17.2000  143.5800      11.7        60       195        94
VIS    2025250     20200   17.2000  143.5600      11.6        59       195        97
VIS    2025250     20200   17.1900  143.5500      12.0        57       192        93
VIS    2025250     20200   17.1800  143.4600      10.1        50       190        93
VIS    2025250     20200   17.2000  143.4500      11.3        55       191        91
VIS    2025250     20200   17.1900  143.4100      11.8        63       193        94
VIS    2025250     20200   17.1900  143.4000      11.9        62       193        95
VIS    2025250     20200   17.2000  143.2900      12.4        51       191        92
VIS    2025250     20200   17.1900  143.2600      13.2        55       193        91
VIS    2025250     20200   17.1900  143.2500      13.2        56       193        93
VIS    2025250     20200   17.2000  143.2200      14.2        53       193        95
VIS    2025250     20200   17.2000  143.1700      10.8        62       192        93
VIS    2025250     20200   17.1900  143.1500      10.7        58       192        93
VIS    2025250     20200   17.2000  143.1400      11.1        58       192        93
VIS    2025250     20200   17.2200  148.7200       8.9        43       978        95
VIS    2025250     20200   17.2200  148.7000       9.0        43       978        98
VIS    2025250     20200   17.2200  148.6800       9.1        44       958        98
VIS    2025250     20200   17.2100  148.6400       9.5        47       942        99
VIS    2025250     20200   17.2200  148.6400       9.5        48       937        98
VIS    2025250     20200   17.2000  148.6100       9.8        46       937        96
VIS    2025250     20200   17.2000  148.5900      10.0        44       938        95
VIS    2025250     20200   17.2200  148.5600       9.5        49       960        98
VIS    2025250     20200   17.2100  148.5300       9.8        50       960        96
VIS    2025250     20200   17.2000  148.4900       8.7        48       940        96
VIS    2025250     20200   17.2100  148.4800       8.5        48       943        93
VIS    2025250     20200   17.2100  148.4500       8.4        48       951        92
VIS    2025250     20200   17.2200  148.4200       8.7        49       951        97
VIS    2025250     20200   17.2200  148.4200       8.9        50       951        97
VIS    2025250     20200   17.2100  148.3900       8.9        49       952        95
VIS    2025250     20200   17.2100  147.3300      10.8        46       958        96
VIS    2025250     20200   17.1900  147.3000      10.5        46       955        97
VIS    2025250     20200   17.2100  147.2900      10.5        45       945        97
VIS    2025250     20200   17.2100  147.2500      10.2        44       949        94
VIS    2025250     20200   17.2000  147.2200       9.8        44       957        97
VIS    2025250     20200   17.2000  147.1900       9.8        46       962        97
VIS    2025250     20200   17.2100  147.1600      10.1        45       948        98
VIS    2025250     20200   17.1900  147.1300      10.5        44       939        98
VIS    2025250     20200   17.2000  147.1000      10.3        43       929        99
VIS    2025250     20200   17.1900  147.0800      10.1        44       942        97
VIS    2025250     20200   17.1900  147.0500      10.2        41       951        97
VIS    2025250     20200   17.2000  147.0300      10.4        38       941        95
VIS    2025250     20200   17.2000  147.0100      10.7        40       951        94
VIS    2025250     20200   17.2000  146.9900      10.5        42       951        98
VIS    2025250     20200   17.1900  146.9700      10.8        42       951        98
VIS    2025250     20200   17.1900  146.9400      11.0        42       957        97
VIS    2025250     20200   17.1900  146.9100      10.9        39       957        97
VIS    2025250     20200   17.2100  146.9000      10.5        38       943        98
VIS    2025250     20200   17.1900  146.8600      10.9        39       945        93
VIS    2025250     20200   17.1800  146.8300      10.7        39       925        92
VIS    2025250     20200   17.1900  146.8200      10.5        40       918        92
VIS    2025250     20200   17.2000  146.7800      10.1        40       915        96
VIS    2025250     20200   17.2000  146.7600       9.9        39       922        98
VIS    2025250     20200   17.2000  146.7500       9.6        39       912        98
VIS    2025250     20200   17.1900  146.7300       9.7        38       906        97
VIS    2025250     20200   17.2000  146.7100      10.1        37       903        98
VIS    2025250     20200   17.1900  146.6600      10.4        37       907        98
VIS    2025250     20200   17.1800  146.6600      10.8        36       906        96
VIS    2025250     20200   17.1900  146.6300      10.9        37       898        96
VIS    2025250     20200   17.1800  146.5900      11.2        35       894        95
VIS    2025250     20200   17.1900  146.5700      11.1        36       894        96
VIS    2025250     20200   17.1900  146.5500      10.7        37       894        96
VIS    2025250     20200   17.1900  146.5200      10.7        36       895        90
VIS    2025250     20200   17.1800  146.4700       9.1        32       895        96
VIS    2025250     20200   17.1900  146.4500       9.2        29       896        95
VIS    2025250     20200   17.1800  146.4300       9.5        28       900        94
VIS    2025250     20200   17.2000  146.4100       9.2        27       900        92
VIS    2025250     20200   17.2000  146.3700       9.4        22       932        97
VIS    2025250     20200   17.1900  146.3500       9.3        21       946        98
VIS    2025250     20200   17.1800  146.2500      10.6        37       938        98
VIS    2025250     20200   17.1900  146.2200      10.1        39       840        95
VIS    2025250     20200   17.1900  146.2100      10.0        40       802        96
VIS    2025250     20200   17.1800  146.1900      10.5        39       802        93
VIS    2025250     20200   17.1800  146.0900      10.1        31       934        98
VIS    2025250     20200   17.1800  145.8200      10.3        33       785        92
VIS    2025250     20200   17.1700  143.6500       7.9        61       195        95
VIS    2025250     20200   17.1800  143.6000      10.7        54       197        93
VIS    2025250     20200   17.1700  143.5700      11.4        49       197        95
VIS    2025250     20200   17.1600  143.4300      11.7        48       193        91
VIS    2025250     20200   17.1700  143.4200      11.5        55       193        94
VIS    2025250     20200   17.1800  143.3300      12.2        42       192        90
VIS    2025250     20200   17.1600  143.2500      12.9        49       193        93
VIS    2025250     20200   17.1800  143.1700      10.6        58       193        91
VIS    2025250     20200   17.1800  143.1500      10.4        57       192        91
VIS    2025250     20200   17.1800  148.6900       9.4        44       987        98
VIS    2025250     20200   17.1900  148.6800       9.2        44       982        99
VIS    2025250     20200   17.1900  148.6400       9.5        45       955        99
VIS    2025250     20200   17.1900  148.6000       9.7        42       938        96
VIS    2025250     20200   17.1800  148.5600      10.0        42       971        97
VIS    2025250     20200   17.1900  148.5400       9.9        46       967        98
VIS    2025250     20200   17.2000  148.5400       9.9        49       964        98
VIS    2025250     20200   17.2000  148.4900       8.7        47       940        96
VIS    2025250     20200   17.1900  148.4900       8.5        47       945        98
VIS    2025250     20200   17.1900  148.4600       8.5        44       940        98
VIS    2025250     20200   17.1900  148.4200       9.0        48       948        95
VIS    2025250     20200   17.1800  148.4000       9.0        51       948        91
VIS    2025250     20200   17.1800  148.3800       8.5        49       939        93
VIS    2025250     20200   17.1900  148.3500       7.9        45       939        91
VIS    2025250     20200   17.1800  147.2900      10.5        47       955        96
VIS    2025250     20200   17.1600  147.2700      10.2        45       960        97
VIS    2025250     20200   17.1600  147.2600      10.3        45       960        96
VIS    2025250     20200   17.1700  147.2300      10.7        44       965        96
VIS    2025250     20200   17.1800  147.2100      10.2        46       962        97
VIS    2025250     20200   17.1600  147.1800      10.4        45       975        97
VIS    2025250     20200   17.1800  147.1600      10.5        45       961        97
VIS    2025250     20200   17.1800  147.1400      10.5        44       953        97
VIS    2025250     20200   17.1700  147.1100      10.2        44       947        97
VIS    2025250     20200   17.1700  147.0800      10.3        44       952        95
VIS    2025250     20200   17.1600  147.0700      10.3        44       958        96
VIS    2025250     20200   17.1700  147.0200      10.7        41       951        96
VIS    2025250     20200   17.1800  146.9800      10.9        42       951        97
VIS    2025250     20200   17.1800  146.9500      11.0        44       957        97
VIS    2025250     20200   17.1800  146.9400      11.0        42       957        96
VIS    2025250     20200   17.1600  146.9100      11.6        42       957        96
VIS    2025250     20200   17.1600  146.8800      11.3        35       947        96
VIS    2025250     20200   17.1600  146.8600      11.3        36       938        93
VIS    2025250     20200   17.1800  146.8400      10.9        38       923        91
VIS    2025250     20200   17.1700  146.8200      10.8        37       911        94
VIS    2025250     20200   17.1600  146.7800      10.7        37       907        96
VIS    2025250     20200   17.1600  146.7800      10.7        37       906        96
VIS    2025250     20200   17.1600  146.7300      10.2        36       906        98
VIS    2025250     20200   17.1600  146.7300      10.2        37       906        97
VIS    2025250     20200   17.1600  146.7000      10.1        36       907        97
VIS    2025250     20200   17.1600  146.6800      10.5        33       909        96
VIS    2025250     20200   17.1800  146.6600      10.9        36       907        96
VIS    2025250     20200   17.1700  146.6300      11.3        37       899        96
VIS    2025250     20200   17.1800  146.5900      11.2        36       894        95
VIS    2025250     20200   17.1700  146.5700      10.9        38       894        97
VIS    2025250     20200   17.1700  146.5400      10.8        40       894        94
VIS    2025250     20200   17.1600  146.5100      11.0        37       896        90
VIS    2025250     20200   17.1700  146.4900      10.3        35       896        92
VIS    2025250     20200   17.1700  146.4800       9.8        36       895        96
VIS    2025250     20200   17.1600  146.4500       9.4        32       896        97
VIS    2025250     20200   17.1700  146.4300       9.8        28       900        95
VIS    2025250     20200   17.1800  146.4000       9.7        25       909        95
VIS    2025250     20200   17.1700  146.3900       9.7        23       920        96
VIS    2025250     20200   17.1800  146.2500      10.6        37       956        97
VIS    2025250     20200   17.1700  146.2200      10.3        38       928        98
VIS    2025250     20200   17.1600  146.2200      10.4        38       914        98
VIS    2025250     20200   17.1700  146.1900      10.5        38       837        93
VIS    2025250     20200   17.1500  146.1200      10.1        35       926        94
VIS    2025250     20200   17.1700  145.8600       9.8        34       794        91
VIS    2025250     20200   17.1700  145.8300      10.0        36       796        95
VIS    2025250     20200   17.1700  145.8300      10.2        34       789        93
VIS    2025250     20200   17.1600  145.7000       9.5        40       854        96
VIS    2025250     20200   17.1600  143.6700       7.7        73       195        96
VIS    2025250     20200   17.1400  143.6300       8.5        65       194        96
VIS    2025250     20200   17.1400  143.6000       8.9        75       193        94
VIS    2025250     20200   17.1500  143.5700       9.7        62       190        96
VIS    2025250     20200   17.1400  143.4500      11.7        46       190        91
VIS    2025250     20200   17.1400  143.4400      12.0        45       191        90
VIS    2025250     20200   17.1500  143.4100      12.0        46       193        90
VIS    2025250     20200   17.1500  143.2400      12.9        48       195        91
VIS    2025250     20200   17.1400  143.2100      13.0        48       194        91
VIS    2025250     20200   17.1400  142.4900      14.1       133       148        90
VIS    2025250     20200   17.1700  148.6800       9.7        45       987        97
VIS    2025250     20200   17.1600  148.6000       9.3        41       947        98
VIS    2025250     20200   17.1700  148.5900       9.5        40       944        97
VIS    2025250     20200   17.1600  148.5500       9.8        43       967        97
VIS    2025250     20200   17.1700  148.5400       9.7        45       967        98
VIS    2025250     20200   17.1600  148.5100       9.0        46       948        99
VIS    2025250     20200   17.1600  148.5000       8.8        46       948        99
VIS    2025250     20200   17.1600  148.4800       8.3        45       945        99
VIS    2025250     20200   17.1700  148.4400       8.8        45       934        99
VIS    2025250     20200   17.1700  148.3800       8.5        50       939        92
VIS    2025250     20200   17.1600  147.3100       9.6        48       966        98
VIS    2025250     20200   17.1600  147.2900      10.0        47       965        97
VIS    2025250     20200   17.1500  147.2600      10.0        45       960        97
VIS    2025250     20200   17.1600  147.2500      10.4        45       960        96
VIS    2025250     20200   17.1400  147.2100      10.8        41       975        95
VIS    2025250     20200   17.1400  147.1900      10.4        40       975        98
VIS    2025250     20200   17.1600  147.1800      10.4        44       975        97
VIS    2025250     20200   17.1500  147.1400      10.3        43       953        95
VIS    2025250     20200   17.1500  147.1200      10.0        44       953        95
VIS    2025250     20200   17.1400  147.1000       9.7        44       957        97
VIS    2025250     20200   17.1600  147.0800      10.2        44       958        94
VIS    2025250     20200   17.1500  147.0400      10.6        44       967        97
VIS    2025250     20200   17.1600  146.9700      10.9        43       961        97
VIS    2025250     20200   17.1600  146.9400      11.2        45       957        96
VIS    2025250     20200   17.1500  146.9200      11.5        44       957        95
VIS    2025250     20200   17.1500  146.8900      11.6        36       948        96
VIS    2025250     20200   17.1500  146.8900      11.5        36       948        96
VIS    2025250     20200   17.1600  146.8600      11.4        35       936        93
VIS    2025250     20200   17.1600  146.8200      11.1        37       911        95
VIS    2025250     20200   17.1600  146.7900      10.8        37       908        96
VIS    2025250     20200   17.1600  146.7900      10.8        37       908        96
VIS    2025250     20200   17.1600  146.7700      10.7        37       906        96
VIS    2025250     20200   17.1500  146.7300      10.5        36       906        97
VIS    2025250     20200   17.1500  146.7000      10.4        35       907        98
VIS    2025250     20200   17.1500  146.6900      10.3        35       909        98
VIS    2025250     20200   17.1500  146.6600      11.2        33       907        95
VIS    2025250     20200   17.1400  146.6400      11.6        36       903        95
VIS    2025250     20200   17.1300  146.6000      10.7        43       896        98
VIS    2025250     20200   17.1300  146.5900      10.6        43       896        98
VIS    2025250     20200   17.1400  146.5600      10.9        43       894        95
VIS    2025250     20200   17.1300  146.5300      10.8        37       896        95
VIS    2025250     20200   17.1500  146.5000      10.8        34       896        91
VIS    2025250     20200   17.1500  146.5000      10.6        33       896        93
VIS    2025250     20200   17.1500  146.4600       9.6        31       896        96
VIS    2025250     20200   17.1300  146.4500       9.7        30       896        96
VIS    2025250     20200   17.1400  146.4100       9.5        24       906        95
VIS    2025250     20200   17.1500  146.3900       9.6        23       920        97
VIS    2025250     20200   17.1500  146.3700       9.3        21       946        98
VIS    2025250     20200   17.1500  146.3500       9.3        21       948        97
VIS    2025250     20200   17.1500  146.2500      10.5        37       956        95
VIS    2025250     20200   17.1500  146.2200      10.5        37       928        98
VIS    2025250     20200   17.1500  146.1600      10.7        37       850        92
VIS    2025250     20200   17.1300  146.1400      10.4        36       922        97
VIS    2025250     20200   17.1400  146.1100      10.1        36       926        97
VIS    2025250     20200   17.1400  146.1100      10.0        36       946        96
VIS    2025250     20200   17.1300  146.0800      10.0        38       824        94
VIS    2025250     20200   17.1400  145.8700       9.5        38       825        96
VIS    2025250     20200   17.1400  145.8700       9.6        37       825        96
VIS    2025250     20200   17.1300  145.8200       9.9        35       809        95
VIS    2025250     20200   17.1400  145.8200      10.1        35       799        95
VIS    2025250     20200   17.1400  145.7300       9.4        41       864        99
VIS    2025250     20200   17.1400  145.7200       9.3        41       864        99
VIS    2025250     20200   17.1300  145.6900       8.8        44       859        99
VIS    2025250     20200   17.1200  143.6800       9.6        41       196        90
VIS    2025250     20200   17.1300  143.6700       8.7        52       195        97
VIS    2025250     20200   17.1200  143.6400       8.9        60       193        95
VIS    2025250     20200   17.1300  143.6200       8.6        74       193        96
VIS    2025250     20200   17.1300  143.4600      11.7        46       189        90
VIS    2025250     20200   17.1200  143.4500      11.4        47       189        91
VIS    2025250     20200   17.1100  143.4300      11.0        49       189        90
VIS    2025250     20200   17.1300  143.3700      11.8        48       191        90
VIS    2025250     20200   17.1200  143.2700      12.8        52       192        92
VIS    2025250     20200   17.1100  143.2500      13.2        50       195        93
VIS    2025250     20200   17.1100  143.2400      13.3        48       195        91
VIS    2025250     20200   17.1400  148.6600      10.1        44       975        95
VIS    2025250     20200   17.1500  148.6300       9.7        43       972        98
VIS    2025250     20200   17.1500  148.6200       9.7        42       965        98
VIS    2025250     20200   17.1500  148.5900       9.7        40       958        97
VIS    2025250     20200   17.1500  148.5600      10.0        41       971        96
VIS    2025250     20200   17.1300  148.5400       9.5        43       933        98
VIS    2025250     20200   17.1300  148.5000       8.9        46       938        99
VIS    2025250     20200   17.1300  148.5000       8.8        46       938        99
VIS    2025250     20200   17.1300  148.4600       8.0        54       951        97
VIS    2025250     20200   17.1500  148.3600       8.5        50       941        96
VIS    2025250     20200   17.1300  147.3100       9.0        45       966        99
VIS    2025250     20200   17.1400  147.2600       9.6        45       958        98
VIS    2025250     20200   17.1300  147.2100      10.4        40       974        98
VIS    2025250     20200   17.1200  147.2000      10.3        39       974        98
VIS    2025250     20200   17.1300  147.1800      10.1        40       965        99
VIS    2025250     20200   17.1100  147.1400       9.8        40       952        94
VIS    2025250     20200   17.1300  147.1100       9.7        43       953        96
VIS    2025250     20200   17.1100  147.1000       9.9        39       950        98
VIS    2025250     20200   17.1200  147.0800      10.0        41       957        98
VIS    2025250     20200   17.1200  147.0600      10.5        45       962        96
VIS    2025250     20200   17.1300  147.0200      10.4        46       966        97
VIS    2025250     20200   17.1300  147.0000      10.5        44       964        97
VIS    2025250     20200   17.1200  146.9700      10.6        43       967        98
VIS    2025250     20200   17.1200  146.9500      11.1        46       968        96
VIS    2025250     20200   17.1300  146.9300      11.4        44       966        96
VIS    2025250     20200   17.1200  146.8900      11.9        36       956        95
VIS    2025250     20200   17.1200  146.8700      11.7        36       926        96
VIS    2025250     20200   17.1100  146.8700      11.7        37       926        96
VIS    2025250     20200   17.1200  146.8400      11.6        39       912        95
VIS    2025250     20200   17.1300  146.8200      11.4        38       909        95
VIS    2025250     20200   17.1300  146.7900      11.2        37       907        95
VIS    2025250     20200   17.1200  146.7600      11.4        36       906        94
VIS    2025250     20200   17.1300  146.7300      11.3        34       907        96
VIS    2025250     20200   17.1300  146.7200      11.3        34       908        96
VIS    2025250     20200   17.1200  146.6800      11.6        33       910        96
VIS    2025250     20200   17.1300  146.6700      11.5        32       907        95
VIS    2025250     20200   17.1100  146.6300      11.1        42       906        97
VIS    2025250     20200   17.1200  146.6200      11.0        41       905        97
VIS    2025250     20200   17.1300  146.5900      10.5        43       896        98
VIS    2025250     20200   17.1200  146.5600      10.3        44       897        97
VIS    2025250     20200   17.1100  146.5400       9.9        41       897        99
VIS    2025250     20200   17.1200  146.5200      10.1        32       896        96
VIS    2025250     20200   17.1100  146.4900       9.5        26       896        94
VIS    2025250     20200   17.1100  146.4600       9.7        27       896        94
VIS    2025250     20200   17.1200  146.4500       9.7        29       896        95
VIS    2025250     20200   17.1200  146.4200       9.4        26       900        93
VIS    2025250     20200   17.1100  146.3800       9.2        19       943        97
VIS    2025250     20200   17.1200  146.3600       9.3        20       954        97
VIS    2025250     20200   17.1200  146.1500      10.6        37       922        97
VIS    2025250     20200   17.1200  146.0900      10.1        38       824        93
VIS    2025250     20200   17.1200  145.8600       9.6        36       829        95
VIS    2025250     20200   17.1200  145.8400       9.7        35       829        95
VIS    2025250     20200   17.1000  145.7300       9.2        40       861        99
VIS    2025250     20200   17.1200  145.7100       8.9        43       861        99
VIS    2025250     20200   17.1200  145.6900       8.9        43       859        99
VIS    2025250     20200   17.1100  143.6500       9.3        56       193        97
VIS    2025250     20200   17.0900  143.4400      11.6        45       188        90
VIS    2025250     20200   17.0900  143.4400      11.5        46       188        90
VIS    2025250     20200   17.1000  143.2800      12.2        56       192        91
VIS    2025250     20200   17.1000  143.2500      13.1        53       195        92
VIS    2025250     20200   17.1000  143.2500      13.0        51       194        91
VIS    2025250     20200   17.0900  143.2200      13.1        44       193        91
VIS    2025250     20200   17.0900  143.2000      13.5        42       193        91
VIS    2025250     20200   17.0900  143.1100       9.3        61       191        90
VIS    2025250     20200   17.0800  142.1700      12.9       135       114        98
VIS    2025250     20200   17.0800  142.1500      13.1       133       112        96
VIS    2025250     20200   17.0900  142.1100      14.1       138       115        92
VIS    2025250     20200   17.1000  148.6200       9.9        44       979        93
VIS    2025250     20200   17.1100  148.5800       9.6        41       976        91
VIS    2025250     20200   17.1100  148.5600       9.6        40       954        91
VIS    2025250     20200   17.1100  148.5400       9.7        39       924        95
VIS    2025250     20200   17.1200  148.5000       8.9        45       938        99
VIS    2025250     20200   17.1100  148.4800       8.5        47       949        93
VIS    2025250     20200   17.1200  148.4300       8.1        60       964        94
VIS    2025250     20200   17.1000  148.4200       8.4        60       955        96
VIS    2025250     20200   17.1200  148.4000       8.2        55       980        97
VIS    2025250     20200   17.1000  147.2500       9.7        41       965        99
VIS    2025250     20200   17.1100  147.2200      10.0        41       974        98
VIS    2025250     20200   17.1100  147.1800      10.1        38       964        99
VIS    2025250     20200   17.0900  147.1700      10.0        38       964        96
VIS    2025250     20200   17.0900  147.1500       9.7        40       951        97
VIS    2025250     20200   17.1000  147.1100       9.9        38       945        99
VIS    2025250     20200   17.1100  147.1000       9.8        38       950        98
VIS    2025250     20200   17.0900  147.0600      10.6        42       955        95
VIS    2025250     20200   17.0900  147.0500      10.6        42       955        95
VIS    2025250     20200   17.1000  147.0200      10.4        46       966        94
VIS    2025250     20200   17.0900  147.0100      10.1        43       966        95
VIS    2025250     20200   17.1100  146.9600      10.7        44       968        97
VIS    2025250     20200   17.1000  146.9400      11.1        44       969        95
VIS    2025250     20200   17.1000  146.9100      11.9        40       969        95
VIS    2025250     20200   17.0900  146.8900      12.0        38       952        95
VIS    2025250     20200   17.0900  146.8800      12.1        38       951        95
VIS    2025250     20200   17.1100  146.8600      11.6        39       924        96
VIS    2025250     20200   17.1100  146.8200      11.5        38       912        95
VIS    2025250     20200   17.1000  146.8100      11.2        38       912        96
VIS    2025250     20200   17.1100  146.7700      11.4        37       907        94
VIS    2025250     20200   17.1100  146.7400      12.0        34       908        92
VIS    2025250     20200   17.1000  146.7200      11.7        35       921        95
VIS    2025250     20200   17.1100  146.7100      11.7        35       921        96
VIS    2025250     20200   17.1100  146.6800      11.3        35       912        97
VIS    2025250     20200   17.1000  146.6500      10.9        40       907        97
VIS    2025250     20200   17.0900  146.6200      10.7        43       907        98
VIS    2025250     20200   17.0900  146.6100      10.4        41       906        98
VIS    2025250     20200   17.0900  146.5800       9.2        41       904       100
VIS    2025250     20200   17.0900  146.5600       8.8        42       901        99
VIS    2025250     20200   17.1000  146.5400       9.7        42       897        99
VIS    2025250     20200   17.1000  146.5000       9.2        26       896        94
VIS    2025250     20200   17.1000  146.5000       9.2        25       895        93
VIS    2025250     20200   17.1000  146.4700       9.4        26       896        94
VIS    2025250     20200   17.0900  146.4300       9.0        29       900        96
VIS    2025250     20200   17.0900  146.4100       9.0        26       903        94
VIS    2025250     20200   17.1000  146.3800       9.5        17       922        94
VIS    2025250     20200   17.0800  146.3700       9.1        23       947        97
VIS    2025250     20200   17.1000  146.3400       9.3        23       968        96
VIS    2025250     20200   17.0800  146.3100       9.0        29       968        96
VIS    2025250     20200   17.0800  146.3000       9.2        29       967        97
VIS    2025250     20200   17.1000  146.1500      10.6        37       966        96
VIS    2025250     20200   17.1000  145.8200       9.2        36       850        95
VIS    2025250     20200   17.0800  145.7400       9.0        36       859        97
VIS    2025250     20200   17.1000  145.7300       9.2        39       861        99
VIS    2025250     20200   17.0800  145.7100       9.0        41       859        98
VIS    2025250     20200   17.0700  143.6600      11.1        43       194        92
VIS    2025250     20200   17.0600  143.4700      12.0        45       190        90
VIS    2025250     20200   17.0800  143.4400      11.4        46       189        90
VIS    2025250     20200   17.0800  143.4200      10.6        51       190        93
VIS    2025250     20200   17.0600  143.2100      13.5        40       195        90
VIS    2025250     20200   17.0600  143.2100      13.6        41       195        91
VIS    2025250     20200   17.0700  143.1100       8.9        57       191        90
VIS    2025250     20200   17.0600  142.1900      12.5       133       112        95
VIS    2025250     20200   17.0600  142.1600      12.9       133       112        94
VIS    2025250     20200   17.0600  142.1500      12.8       131       112        96
VIS    2025250     20200   17.0600  142.1200      13.2       133       113        94
VIS    2025250     20200   17.0600  142.1000      13.2       134       113        95
VIS    2025250     20200   17.0600  142.0800      13.2       136       113        94
VIS    2025250     20200   17.0500  142.0200      11.7       138       118        91
VIS    2025250     20200   17.0600  141.4700      14.5       174       147        91
VIS    2025250     20200   17.0500  141.4500      15.1       177       147        94
VIS    2025250     20200   17.0900  148.6500       9.8        48       985        90
VIS    2025250     20200   17.1000  148.6100       9.9        44       976        97
VIS    2025250     20200   17.1000  148.6100       9.8        43       976        97
VIS    2025250     20200   17.0900  148.5600       9.4        41       953        96
VIS    2025250     20200   17.0800  148.5400      10.0        40       942        96
VIS    2025250     20200   17.0900  148.5300       9.8        39       933        95
VIS    2025250     20200   17.0800  148.5000       9.3        41       947        96
VIS    2025250     20200   17.1000  148.4100       8.3        58       947        94
VIS    2025250     20200   17.0700  147.2200      11.5        40       981        96
VIS    2025250     20200   17.0700  147.1900      10.6        40       977        97
VIS    2025250     20200   17.0700  147.1600      10.1        40       959        97
VIS    2025250     20200   17.0900  147.1400       9.8        39       949        99
VIS    2025250     20200   17.0800  147.1300      10.0        39       949        99
VIS    2025250     20200   17.0900  147.1100      10.1        37       951        99
VIS    2025250     20200   17.0700  147.0800      10.3        40       965        97
VIS    2025250     20200   17.0700  147.0400      10.3        40       955        97
VIS    2025250     20200   17.0700  147.0200      10.0        41       955        96
VIS    2025250     20200   17.0700  147.0000       9.8        42       966        94
VIS    2025250     20200   17.0700  146.9800      10.2        42       965        97
VIS    2025250     20200   17.0600  146.9200      10.9        39       964        96
VIS    2025250     20200   17.0700  146.9000      11.1        38       959        97
VIS    2025250     20200   17.0600  146.8700      11.6        42       941        96
VIS    2025250     20200   17.0600  146.8600      11.6        43       936        96
VIS    2025250     20200   17.0800  146.8200      11.2        40       926        97
VIS    2025250     20200   17.0800  146.8100      11.0        39       919        96
VIS    2025250     20200   17.0800  146.7700      11.5        35       912        94
VIS    2025250     20200   17.0700  146.7500      11.9        33       927        95
VIS    2025250     20200   17.0600  146.7400      11.7        33       927        94
VIS    2025250     20200   17.0700  146.7000      10.7        38       939        96
VIS    2025250     20200   17.0800  146.6900      10.6        38       939        98
VIS    2025250     20200   17.0600  146.6600       9.9        39       937        98
VIS    2025250     20200   17.0700  146.6200      10.7        39       908        98
VIS    2025250     20200   17.0600  146.6100      10.4        36       900        97
VIS    2025250     20200   17.0700  146.5800       9.0        36       900        98
VIS    2025250     20200   17.0700  146.5700       8.8        35       900        98
VIS    2025250     20200   17.0700  146.5500       8.7        41       896        97
VIS    2025250     20200   17.0800  146.5100       9.2        33       895        97
VIS    2025250     20200   17.0700  146.4800       9.5        24       895        92
VIS    2025250     20200   17.0700  146.4500       8.7        26       892        94
VIS    2025250     20200   17.0600  146.4400       8.5        30       893        96
VIS    2025250     20200   17.0600  146.4100       8.8        25       903        93
VIS    2025250     20200   17.0600  146.4000       8.9        23       903        92
VIS    2025250     20200   17.0800  146.3800       9.1        20       930        96
VIS    2025250     20200   17.0600  146.3400       8.9        31       968        96
VIS    2025250     20200   17.0700  146.3100       9.0        30       968        98
VIS    2025250     20200   17.0700  146.1400      10.8        35       935        96
VIS    2025250     20200   17.0500  145.8200       8.8        45       832        96
VIS    2025250     20200   17.0700  145.7400       9.0        36       859        97
VIS    2025250     20200   17.0600  145.7300       9.1        38       861        98
VIS    2025250     20200   17.0700  145.7100       9.0        40       859        98
VIS    2025250     20200   17.0400  143.6200      10.5        49       193        93
VIS    2025250     20200   17.0600  143.5400      10.0        50       194        94
VIS    2025250     20200   17.0400  143.4900      11.6        54       192        90
VIS    2025250     20200   17.0600  143.4600      11.7        46       190        90
VIS    2025250     20200   17.0600  143.4300      10.9        46       190        91
VIS    2025250     20200   17.0500  143.4200      10.8        45       192        91
VIS    2025250     20200   17.0500  143.2200      13.1        40       195        90
VIS    2025250     20200   17.0600  143.1100       8.8        57       191        90
VIS    2025250     20200   17.0400  142.3000      10.5       121       119        94
VIS    2025250     20200   17.0300  142.1900      11.4       126       111        94
VIS    2025250     20200   17.0300  142.1800      11.4       127       111        93
VIS    2025250     20200   17.0500  142.1500      12.7       131       112        96
VIS    2025250     20200   17.0500  142.1300      12.5       129       113        96
VIS    2025250     20200   17.0400  142.1000      12.1       129       113        97
VIS    2025250     20200   17.0300  142.0700      12.4       132       116        98
VIS    2025250     20200   17.0500  142.0400      12.3       134       116        93
VIS    2025250     20200   17.0300  140.9900      16.3       166       195        90
VIS    2025250     20200   17.0700  148.6100       9.6        49       975        93
VIS    2025250     20200   17.0800  148.6000       9.7        46       973        98
VIS    2025250     20200   17.0700  148.5600       9.7        42       947        97
VIS    2025250     20200   17.0700  148.5400      10.0        40       942        97
VIS    2025250     20200   17.0700  148.5300      10.0        40       947        96
VIS    2025250     20200   17.0500  148.4900       9.7        41       943        93
VIS    2025250     20200   17.0600  148.4800       9.6        40       943        92
VIS    2025250     20200   17.0600  148.3700       8.2        54       960        95
VIS    2025250     20200   17.0700  148.3400       9.0        52       976        95
VIS    2025250     20200   17.0600  148.3200       8.9        53       966        97
VIS    2025250     20200   17.0700  148.3100       8.7        50       962        94
VIS    2025250     20200   17.0700  148.2800       8.0        46       945        91
VIS    2025250     20200   17.0600  147.1300      10.6        40       954        98
VIS    2025250     20200   17.0600  147.0900      10.3        42       968        98
VIS    2025250     20200   17.0600  147.0500      10.1        41       955        96
VIS    2025250     20200   17.0600  147.0300      10.2        39       936        98
VIS    2025250     20200   17.0500  147.0100      10.0        40       952        98
VIS    2025250     20200   17.0500  146.9900       9.9        43       972        97
VIS    2025250     20200   17.0600  146.9500      10.7        43       966        97
VIS    2025250     20200   17.0500  146.9400      10.9        42       966        96
VIS    2025250     20200   17.0400  146.9100      10.0        38       968        99
VIS    2025250     20200   17.0600  146.8800      11.0        40       950        97
VIS    2025250     20200   17.0600  146.8600      11.5        43       936        96
VIS    2025250     20200   17.0500  146.8400      11.3        43       934        97
VIS    2025250     20200   17.0500  146.8100      10.8        40       934        97
VIS    2025250     20200   17.0500  146.7800      11.1        36       935        96
VIS    2025250     20200   17.0500  146.7700      11.3        34       934        96
VIS    2025250     20200   17.0400  146.7300      11.2        35       910        95
VIS    2025250     20200   17.0400  146.7200      11.1        36       910        96
VIS    2025250     20200   17.0400  146.6900      10.5        37       924        99
VIS    2025250     20200   17.0500  146.6700      10.0        38       925        99
VIS    2025250     20200   17.0400  146.6500      10.0        38       925        96
VIS    2025250     20200   17.0600  146.6100      10.5        36       902        97
VIS    2025250     20200   17.0500  146.6000      10.1        35       897        97
VIS    2025250     20200   17.0600  146.5700       8.9        34       899        98
VIS    2025250     20200   17.0400  146.5500      10.2        32       895        96
VIS    2025250     20200   17.0400  146.5300       9.7        34       894        93
VIS    2025250     20200   17.0500  146.5100       9.7        34       894        94
VIS    2025250     20200   17.0400  146.4800       9.0        33       894        95
VIS    2025250     20200   17.0400  146.4400       8.8        28       893        95
VIS    2025250     20200   17.0400  146.4200       8.7        27       893        94
VIS    2025250     20200   17.0400  146.4000       8.9        25       903        93
VIS    2025250     20200   17.0400  146.3900       8.9        23       915        93
VIS    2025250     20200   17.0500  146.3600       8.9        26       949        97
VIS    2025250     20200   17.0500  146.3400       8.7        31       951        97
VIS    2025250     20200   17.0400  145.9400       9.8        34       977        97
VIS    2025250     20200   17.0400  145.8300       8.8        42       832        94
VIS    2025250     20200   17.0500  145.8200       8.6        45       832        96
VIS    2025250     20200   17.0300  145.7500      10.1        31       823        94
VIS    2025250     20200   17.0300  145.7400       9.6        35       863        97
VIS    2025250     20200   17.0500  145.7300       9.2        38       865        99
VIS    2025250     20200   17.0100  143.6300      11.6        43       195        90
VIS    2025250     20200   17.0300  143.6200      10.7        48       194        94
VIS    2025250     20200   17.0200  143.6100      11.5        47       193        93
VIS    2025250     20200   17.0200  143.4900      12.0        54       190        93
VIS    2025250     20200   17.0200  143.4800      11.6        53       190        93
VIS    2025250     20200   17.0300  143.4500      10.8        48       190        90
VIS    2025250     20200   17.0300  143.4200      10.3        46       192        92
VIS    2025250     20200   17.0300  143.2300      12.2        41       195        91
VIS    2025250     20200   17.0200  143.2200      13.1        41       194        90
VIS    2025250     20200   17.0200  142.3000      10.5       121       119        94
VIS    2025250     20200   17.0300  142.2700      14.9       114       116        93
VIS    2025250     20200   17.0300  142.2500      14.1       110       116        94
VIS    2025250     20200   17.0300  142.1900      11.2       125       111        92
VIS    2025250     20200   17.0100  142.1100      10.4       118       113        94
VIS    2025250     20200   17.0100  142.0800      10.6       122       116        96
VIS    2025250     20200   17.0200  142.0700      11.5       128       116        98
VIS    2025250     20200   17.0100  142.0300       9.7       127       121        94
VIS    2025250     20200   17.0200  142.0100      11.0       134       122        95
VIS    2025250     20200   17.0100  141.9900      12.4       136       122        95
VIS    2025250     20200   17.0200  140.9800      15.3       164       195        93
VIS    2025250     20200   17.0000  140.9700      15.1       163       195        92
VIS    2025250     20200   17.0400  148.6700       8.7        46       989        97
VIS    2025250     20200   17.0400  148.6500       9.2        46       989        93
VIS    2025250     20200   17.0300  148.5700       9.3        44       955        96
VIS    2025250     20200   17.0400  148.5400      10.1        42       949        97
VIS    2025250     20200   17.0300  148.5400      10.0        43       949        98
VIS    2025250     20200   17.0500  148.5000       9.8        42       943        96
VIS    2025250     20200   17.0400  148.4800      10.4        41       941        95
VIS    2025250     20200   17.0500  148.4500       9.0        39       942        95
VIS    2025250     20200   17.0500  148.4400       8.3        40       942        91
VIS    2025250     20200   17.0300  148.4000       7.4        40       958        94
VIS    2025250     20200   17.0300  148.3800       7.8        49       960        98
VIS    2025250     20200   17.0300  148.3700       7.9        55       963        93
VIS    2025250     20200   17.0500  148.3300       8.7        54       966        94
VIS    2025250     20200   17.0500  148.3000       8.5        52       960        95
VIS    2025250     20200   17.0400  148.2800       8.2        49       946        92
VIS    2025250     20200   17.0200  147.2900      10.9        50       986        93
VIS    2025250     20200   17.0200  147.2800      10.8        49       986        94
VIS    2025250     20200   17.0200  147.1800      10.9        45       977        96
VIS    2025250     20200   17.0300  147.1200      11.4        40       974        96
VIS    2025250     20200   17.0300  147.1000      11.1        42       977        95
VIS    2025250     20200   17.0300  147.0900      10.7        43       977        96
VIS    2025250     20200   17.0200  147.0400      10.1        41       974        98
VIS    2025250     20200   17.0200  147.0200      10.6        40       950        97
VIS    2025250     20200   17.0400  147.0100      10.2        40       945        98
VIS    2025250     20200   17.0200  146.9900      10.5        41       970        95
VIS    2025250     20200   17.0200  146.9500      10.1        43       970        98
VIS    2025250     20200   17.0300  146.9000       9.9        38       968        99
VIS    2025250     20200   17.0300  146.8800      10.1        38       962        99
VIS    2025250     20200   17.0100  146.8700      10.6        39       957        99
VIS    2025250     20200   17.0200  146.8400      10.9        42       924        98
VIS    2025250     20200   17.0200  146.8000      11.0        39       918        95
VIS    2025250     20200   17.0200  146.7800      11.2        36       918        95
VIS    2025250     20200   17.0300  146.7700      11.3        35       918        93
VIS    2025250     20200   17.0300  146.7300      11.0        36       910        94
VIS    2025250     20200   17.0300  146.7100      10.8        37       909        97
VIS    2025250     20200   17.0300  146.6800      10.5        37       910        98
VIS    2025250     20200   17.0100  146.6600      10.5        37       909        98
VIS    2025250     20200   17.0300  146.6500      10.1        37       910        95
VIS    2025250     20200   17.0100  146.6200       9.9        36       899        95
VIS    2025250     20200   17.0100  146.5800       9.9        34       894        96
VIS    2025250     20200   17.0100  146.5700      10.3        33       894        95
VIS    2025250     20200   17.0300  146.5500      10.8        32       894        95
VIS    2025250     20200   17.0300  146.5100       9.6        33       894        96
VIS    2025250     20200   17.0300  146.5100       9.5        33       894        96
VIS    2025250     20200   17.0300  146.4700       9.0        32       895        96
VIS    2025250     20200   17.0200  146.4400       9.0        29       899        95
VIS    2025250     20200   17.0100  146.4300       9.1        29       899        95
VIS    2025250     20200   17.0200  146.4100       9.0        28       911        95
VIS    2025250     20200   17.0300  146.3800       8.8        25       930        91
VIS    2025250     20200   17.0300  145.9100       9.8        34       947        96
VIS    2025250     20200   17.0200  145.8900      10.1        32       947        97
VIS    2025250     20200   17.0100  145.8600      10.0        29       910        94
VIS    2025250     20200   17.0100  145.8300       8.9        35       869        91
VIS    2025250     20200   17.0200  145.7500       9.9        34       823        94
VIS    2025250     20200   17.0100  145.7300       9.1        42       865        98
VIS    2025250     20200   17.0000  143.6300      11.4        50       195        91
VIS    2025250     20200   17.0000  143.6100      11.4        52       194        93
VIS    2025250     20200   16.9900  143.4700      11.2        46       189        90
VIS    2025250     20200   17.0000  143.4400      10.3        44       192        91
VIS    2025250     20200   17.0100  143.4000      11.2        41       195        90
VIS    2025250     20200   17.0000  142.1200      10.5       118       113        94
VIS    2025250     20200   17.0000  142.1100      10.2       117       115        94
VIS    2025250     20200   16.9900  142.0600       9.9       117       120        91
VIS    2025250     20200   17.0000  142.0400       9.4       122       123        91
VIS    2025250     20200   16.9900  142.0400       9.6       124       125        92
VIS    2025250     20200   17.0000  142.0000      12.5       136       124        97
VIS    2025250     20200   16.9900  141.9700      11.9       139       124        95
VIS    2025250     20200   16.9800  141.9600      11.2       141       126        94
VIS    2025250     20200   16.9900  141.9000      11.6       149       127        92
VIS    2025250     20200   17.0000  141.7600       8.5       159       128        92
VIS    2025250     20200   17.0200  148.6700       8.6        43       989        96
VIS    2025250     20200   17.0100  148.6400       9.1        44       971        98
VIS    2025250     20200   17.0300  148.6200       9.4        46       969        90
VIS    2025250     20200   17.0200  148.5900       9.2        45       967        91
VIS    2025250     20200   17.0300  148.5800       9.4        46       964        92
VIS    2025250     20200   17.0100  148.5600       9.1        44       960        96
VIS    2025250     20200   17.0300  148.5400       9.9        43       955        97
VIS    2025250     20200   17.0300  148.5100      10.1        43       952        97
VIS    2025250     20200   17.0200  148.4700      10.4        40       940        94
VIS    2025250     20200   17.0300  148.4600      10.5        39       940        93
VIS    2025250     20200   17.0100  148.4400       9.7        34       931        94
VIS    2025250     20200   17.0200  148.4200       8.5        31       951        93
VIS    2025250     20200   17.0200  148.3800       7.7        46       960        98
VIS    2025250     20200   17.0200  148.3700       7.9        53       963        91
VIS    2025250     20200   17.0000  148.3200       8.3        50       968        96
VIS    2025250     20200   17.0000  148.2400       8.1        50       954        94
VIS    2025250     20200   17.0000  147.2600      10.8        46       962        94
VIS    2025250     20200   17.0000  147.2200      10.8        44       955        97
VIS    2025250     20200   17.0100  147.1900      10.9        45       977        95
VIS    2025250     20200   17.0000  147.1800      10.9        44       977        96
VIS    2025250     20200   17.0000  147.1600      11.0        42       977        95
VIS    2025250     20200   17.0100  147.1400      11.3        40       977        96
VIS    2025250     20200   17.0000  147.0900      10.5        40       989        97
VIS    2025250     20200   17.0000  147.0700      10.4        41       976        97
VIS    2025250     20200   17.0000  147.0500      10.6        42       976        98
VIS    2025250     20200   16.9900  147.0200      11.3        43       963        96
VIS    2025250     20200   17.0000  146.9900      10.8        40       968        96
VIS    2025250     20200   17.0000  146.9900      10.8        40       952        96
VIS    2025250     20200   16.9900  146.9500      10.3        41       970        98
VIS    2025250     20200   17.0000  146.9400      10.3        43       970        97
VIS    2025250     20200   17.0100  146.9000      10.3        40       974        98
VIS    2025250     20200   17.0100  146.8700      10.6        39       960        99
VIS    2025250     20200   17.0100  146.8600      10.8        40       949        98
VIS    2025250     20200   16.9900  146.8400      11.3        41       931        97
VIS    2025250     20200   17.0000  146.8200      11.1        42       919        96
VIS    2025250     20200   16.9900  146.7900      11.0        38       915        96
VIS    2025250     20200   17.0100  146.7700      11.1        36       912        95
VIS    2025250     20200   16.9900  146.7300      10.8        36       907        96
VIS    2025250     20200   16.9900  146.7000      10.8        37       905        95
VIS    2025250     20200   17.0000  146.6800      10.8        36       906        97
VIS    2025250     20200   17.0100  146.6600      10.7        37       909        98
VIS    2025250     20200   17.0000  146.6300      10.6        36       900        96
VIS    2025250     20200   17.0000  146.6200      10.1        36       899        96
VIS    2025250     20200   17.0100  146.5800      10.0        34       894        96
VIS    2025250     20200   17.0100  146.5700      10.4        33       894        95
VIS    2025250     20200   17.0000  146.5400      10.8        34       893        96
VIS    2025250     20200   17.0000  146.5100       9.9        35       894        97
VIS    2025250     20200   17.0000  146.5000       9.7        35       895        98
VIS    2025250     20200   16.9900  146.4600       9.3        31       899        95
VIS    2025250     20200   17.0100  146.4400       9.1        29       902        96
VIS    2025250     20200   16.9900  146.4300       9.4        27       912        97
VIS    2025250     20200   16.9900  146.4000       9.4        27       922        98
VIS    2025250     20200   17.0000  146.3700       9.0        28       928        98
VIS    2025250     20200   17.0100  146.3600       8.7        32       933        92
VIS    2025250     20200   16.9900  146.3000       8.9        30       948        97
VIS    2025250     20200   16.9900  146.2800       8.8        33       948        96
VIS    2025250     20200   17.0000  145.9000      10.1        33       947        98
VIS    2025250     20200   17.0000  145.8900      10.4        31       940        98
VIS    2025250     20200   17.0000  145.8700      10.3        28       911        95
VIS    2025250     20200   16.9900  145.8500       9.6        27       911        92
VIS    2025250     20200   16.9800  145.8100       9.6        25       891        93
VIS    2025250     20200   17.0000  145.7200       8.6        47       838       100
VIS    2025250     20200   16.9900  143.6000      11.3        56       193        91
VIS    2025250     20200   16.9700  143.4500      11.1        44       189        90
VIS    2025250     20200   16.9600  142.3900      15.7        99       121        91
VIS    2025250     20200   16.9700  142.3300      14.7       104       120        92
VIS    2025250     20200   16.9600  142.3200      11.7       103       119        96
VIS    2025250     20200   16.9700  142.1300      10.6       111       120        91
VIS    2025250     20200   16.9700  142.1000       9.9       110       118        90
VIS    2025250     20200   16.9700  142.0200      11.3       133       126        95
VIS    2025250     20200   16.9800  142.0000      12.6       140       124        98
VIS    2025250     20200   16.9600  141.9600      11.5       137       128        95
VIS    2025250     20200   16.9700  141.9500      11.3       138       127        94
VIS    2025250     20200   16.9700  141.9200      12.0       143       127        96
VIS    2025250     20200   16.9700  141.9000      11.6       147       131        93
VIS    2025250     20200   16.9600  141.8800      11.6       152       133        91
VIS    2025250     20200   16.9600  141.7500      11.3       170       135        94
VIS    2025250     20200   16.9700  141.7400       9.1       165       134        91
VIS    2025250     20200   17.0000  148.6600       8.6        41       990        98
VIS    2025250     20200   16.9800  148.6300       8.6        41       981        93
VIS    2025250     20200   16.9800  148.5700       9.1        44       965        96
VIS    2025250     20200   16.9800  148.5400       8.9        44       964        96
VIS    2025250     20200   16.9800  148.5200       9.1        44       964        94
VIS    2025250     20200   16.9800  148.5000       9.0        44       957        93
VIS    2025250     20200   16.9800  148.4700       8.7        44       940        93
VIS    2025250     20200   16.9800  148.4600       9.0        42       940        95
VIS    2025250     20200   17.0000  148.4200       9.7        32       951        93
VIS    2025250     20200   17.0000  148.4000       9.0        33       958        91
VIS    2025250     20200   17.0000  148.3800       8.3        43       971        97
VIS    2025250     20200   16.9800  148.3500       8.8        49       970        95
VIS    2025250     20200   16.9900  148.3300       8.7        50       962        98
VIS    2025250     20200   16.9800  148.3100       8.5        49       931        97
VIS    2025250     20200   16.9700  147.2600      10.5        45       962        96
VIS    2025250     20200   16.9700  147.2500      10.4        44       962        97
VIS    2025250     20200   16.9700  147.2100      11.0        46       967        95
VIS    2025250     20200   16.9900  147.0700      10.8        41       976        96
VIS    2025250     20200   16.9900  147.0500      11.0        43       976        97
VIS    2025250     20200   16.9900  147.0200      11.4        43       963        96
VIS    2025250     20200   16.9900  146.9900      10.9        40       952        97
VIS    2025250     20200   16.9900  146.9900      10.9        40       952        96
VIS    2025250     20200   16.9900  146.9400      10.4        41       970        98
VIS    2025250     20200   16.9800  146.9400      10.5        42       968        98
VIS    2025250     20200   16.9700  146.9100      11.0        44       975        96
VIS    2025250     20200   16.9800  146.8500      11.3        42       957        97
VIS    2025250     20200   16.9700  146.8300      11.3        40       949        96
VIS    2025250     20200   16.9700  146.8100      10.9        40       935        98
VIS    2025250     20200   16.9700  146.7500      11.0        37       909        96
VIS    2025250     20200   16.9600  146.7200      11.0        37       909        97
VIS    2025250     20200   16.9600  146.6900      10.9        34       912        96
VIS    2025250     20200   16.9600  146.6600      10.7        37       916        97
VIS    2025250     20200   16.9600  146.6500      10.7        38       912        98
VIS    2025250     20200   16.9600  146.6100      10.5        37       900        98
VIS    2025250     20200   16.9800  146.5800      10.5        34       894        95
VIS    2025250     20200   16.9800  146.5700      10.8        33       893        95
VIS    2025250     20200   16.9800  146.5400      10.8        34       892        96
VIS    2025250     20200   16.9800  146.5200      10.4        35       894        97
VIS    2025250     20200   16.9800  146.4900      10.3        33       895        96
VIS    2025250     20200   16.9800  146.4600       9.9        30       903        96
VIS    2025250     20200   16.9800  146.4500       9.3        29       912        98
VIS    2025250     20200   16.9800  146.4300       9.9        26       919        98
VIS    2025250     20200   16.9800  146.3800       9.2        27       928        99
VIS    2025250     20200   16.9600  146.3400       8.8        28       964        99
VIS    2025250     20200   16.9600  146.3300       8.6        27       964        99
VIS    2025250     20200   16.9700  146.2900       8.5        39       970        96
VIS    2025250     20200   16.9800  146.2800       8.8        35       956        96
VIS    2025250     20200   16.9600  146.2600      10.0        35       956        95
VIS    2025250     20200   16.9600  146.2200       9.9        37       953        96
VIS    2025250     20200   16.9700  146.1900      10.3        33       891        94
VIS    2025250     20200   16.9800  146.1600      10.4        31       834        90
VIS    2025250     20200   16.9800  145.8800      10.3        29       937        97
VIS    2025250     20200   16.9600  145.8500       9.6        28       937        97
VIS    2025250     20200   16.9700  145.8500       9.5        27       937        96
VIS    2025250     20200   16.9800  145.8200       9.4        28       891        95
VIS    2025250     20200   16.9400  143.6300      12.8        61       193        90
VIS    2025250     20200   16.9400  143.5800      12.0        44       192        90
VIS    2025250     20200   16.9500  142.3900      15.8       100       121        91
VIS    2025250     20200   16.9500  142.3700      15.7       102       121        91
VIS    2025250     20200   16.9400  142.3000      11.7       104       119        94
VIS    2025250     20200   16.9500  142.2800      12.1       100       119        91
VIS    2025250     20200   16.9400  142.1500      11.2       112       123        90
VIS    2025250     20200   16.9400  142.1200      10.7       109       122        90
VIS    2025250     20200   16.9400  142.0600      13.4       124       126        93
VIS    2025250     20200   16.9500  142.0500      12.1       125       126        92
VIS    2025250     20200   16.9300  142.0200      12.7       136       130        96
VIS    2025250     20200   16.9400  142.0000      11.6       141       132        90
VIS    2025250     20200   16.9500  141.9700      11.9       138       128        95
VIS    2025250     20200   16.9500  141.9600      12.2       137       127        94
VIS    2025250     20200   16.9500  141.9200      12.1       141       127        95
VIS    2025250     20200   16.9400  141.9100      12.2       145       130        94
VIS    2025250     20200   16.9300  141.8700      12.6       153       126        95
VIS    2025250     20200   16.9500  141.7500      11.4       171       135        94
VIS    2025250     20200   16.9500  141.7400      11.3       170       139        92
VIS    2025250     20200   16.9300  140.9300      20.0       151       195        90
VIS    2025250     20200   16.9800  148.6000       8.8        42       970        96
VIS    2025250     20200   16.9700  148.5700       8.9        44       965        97
VIS    2025250     20200   16.9700  148.5300       8.7        43       964        94
VIS    2025250     20200   16.9600  148.5000       9.1        42       957        94
VIS    2025250     20200   16.9600  148.4900       9.1        44       952        96
VIS    2025250     20200   16.9800  148.4700       8.7        43       940        95
VIS    2025250     20200   16.9700  148.4500       9.2        41       951        97
VIS    2025250     20200   16.9700  148.3900       8.6        44       981        91
VIS    2025250     20200   16.9700  148.3600       9.0        46       970        94
VIS    2025250     20200   16.9700  148.3300       9.0        48       949        97
VIS    2025250     20200   16.9800  148.3300       8.9        49       949        97
VIS    2025250     20200   16.9700  148.2900       8.0        47       929        90
VIS    2025250     20200   16.9600  147.2700      10.7        45       979        96
VIS    2025250     20200   16.9500  147.2500       9.8        42       962        98
VIS    2025250     20200   16.9600  147.2400      10.4        43       962        97
VIS    2025250     20200   16.9500  147.2000      10.4        46       962        95
VIS    2025250     20200   16.9500  147.0600      11.2        41       984        96
VIS    2025250     20200   16.9600  147.0300      11.3        43       963        96
VIS    2025250     20200   16.9500  147.0100      11.1        43       924        97
VIS    2025250     20200   16.9600  146.9800      11.0        39       923        97
VIS    2025250     20200   16.9600  146.9700      11.1        39       923        97
VIS    2025250     20200   16.9600  146.9500      10.9        39       952        98
VIS    2025250     20200   16.9500  146.9200      11.0        43       974        96
VIS    2025250     20200   16.9500  146.8600      11.3        45       983        95
VIS    2025250     20200   16.9400  146.8400      11.2        39       982        97
VIS    2025250     20200   16.9600  146.7900      10.6        40       935        99
VIS    2025250     20200   16.9400  146.7000      10.5        34       952        98
VIS    2025250     20200   16.9500  146.6700      10.3        36       940        96
VIS    2025250     20200   16.9400  146.6500      10.1        40       922        98
VIS    2025250     20200   16.9600  146.6200      10.5        38       901        98
VIS    2025250     20200   16.9400  146.6000      10.0        39       903        98
VIS    2025250     20200   16.9500  146.5900      10.2        37       896        97
VIS    2025250     20200   16.9600  146.5500      10.3        37       894        96
VIS    2025250     20200   16.9500  146.5200      10.4        38       895        96
VIS    2025250     20200   16.9500  146.5000      10.4        36       900        97
VIS    2025250     20200   16.9500  146.4900      10.4        34       904        97
VIS    2025250     20200   16.9600  146.4600      10.7        29       919        97
VIS    2025250     20200   16.9400  146.4300      11.1        29       944        95
VIS    2025250     20200   16.9500  146.4200       9.8        27       940        99
VIS    2025250     20200   16.9400  146.3700      10.4        39       964        97
VIS    2025250     20200   16.9400  146.3600      10.1        39       964        95
VIS    2025250     20200   16.9500  146.3400       8.5        27       975        96
VIS    2025250     20200   16.9500  146.2900       8.8        37       951        91
VIS    2025250     20200   16.9600  146.2700       9.6        35       962        92
VIS    2025250     20200   16.9400  146.2500      10.4        33       951        98
VIS    2025250     20200   16.9600  146.2200       9.9        36       953        96
VIS    2025250     20200   16.9600  146.2000       9.6        35       834        92
VIS    2025250     20200   16.9600  146.1800      10.1        31       891        94
VIS    2025250     20200   16.9500  146.1500       9.8        27       891        95
VIS    2025250     20200   16.9400  146.1100       9.0        29       979        94
VIS    2025250     20200   16.9500  146.1000       9.1        28       979        95
VIS    2025250     20200   16.9300  146.0400      10.2        32       987        98
VIS    2025250     20200   16.9500  145.8700       9.7        28       937        94
VIS    2025250     20200   16.9300  143.6200      12.4        55       193        93
VIS    2025250     20200   16.9200  143.6000      12.1        47       193        91
VIS    2025250     20200   16.9200  143.5800      10.1        56       193        90
VIS    2025250     20200   16.9200  143.5600      10.1        68       190        99
VIS    2025250     20200   16.9200  143.5300      11.0        59       191        97
VIS    2025250     20200   16.9200  142.4000      15.5        98       119        91
VIS    2025250     20200   16.9300  142.3800      15.7       100       119        91
VIS    2025250     20200   16.9300  142.3400      15.0        97       119        90
VIS    2025250     20200   16.9200  142.3200      14.5        95       119        90
VIS    2025250     20200   16.9300  142.3000      11.7       104       119        90
VIS    2025250     20200   16.9300  142.0800      11.4       124       125        94
VIS    2025250     20200   16.9100  142.0400      14.5       137       127        99
VIS    2025250     20200   16.9100  142.0200      14.3       140       127        99
VIS    2025250     20200   16.9100  142.0100      14.7       142       127        99
VIS    2025250     20200   16.9100  141.9800      14.4       145       126        97
VIS    2025250     20200   16.9100  141.9500      13.3       145       130        97
VIS    2025250     20200   16.9100  141.9200      13.3       150       130        96
VIS    2025250     20200   16.9300  141.9000      12.9       147       130        96
VIS    2025250     20200   16.9300  141.8800      12.9       151       126        96
VIS    2025250     20200   16.9300  141.6900      10.8       175       143        90
VIS    2025250     20200   16.9100  140.9500      20.1       149       194        91
VIS    2025250     20200   16.9200  140.9300      19.9       151       195        91
VIS    2025250     20200   16.9500  148.5300       8.8        42       957        97
VIS    2025250     20200   16.9500  148.5100       9.2        42       957        97
VIS    2025250     20200   16.9500  148.4900       9.2        43       956        97
VIS    2025250     20200   16.9400  148.4600       9.6        41       971        97
VIS    2025250     20200   16.9500  148.4100       9.7        43       982        94
VIS    2025250     20200   16.9400  148.4000       9.6        45       970        98
VIS    2025250     20200   16.9400  148.3800       9.0        46       970        97
VIS    2025250     20200   16.9400  148.3500       9.2        46       949        98
VIS    2025250     20200   16.9400  148.3300       8.7        51       921        99
VIS    2025250     20200   16.9400  148.3000       7.6        56       920        97
VIS    2025250     20200   16.9400  148.2600       7.9        44       931        96
VIS    2025250     20200   16.9500  148.2500       7.8        44       934        94
VIS    2025250     20200   16.9400  147.2500       9.9        43       962        97
VIS    2025250     20200   16.9300  147.2200      10.2        43       962        94
VIS    2025250     20200   16.9400  147.2200      10.2        43       962        95
VIS    2025250     20200   16.9300  147.1900      10.1        46       967        96
VIS    2025250     20200   16.9400  147.0100      11.2        43       949        96
VIS    2025250     20200   16.9400  146.9900      11.0        42       924        97
VIS    2025250     20200   16.9400  146.9600      11.0        41       929        98
VIS    2025250     20200   16.9400  146.8600      11.1        43       986        96
VIS    2025250     20200   16.9200  146.8400      11.0        38       986        97
VIS    2025250     20200   16.9400  146.7000      10.4        34       956        97
VIS    2025250     20200   16.9200  146.6600      10.4        44       985        92
VIS    2025250     20200   16.9300  146.6400      10.2        41       942        98
VIS    2025250     20200   16.9300  146.6400      10.2        40       922        99
VIS    2025250     20200   16.9200  146.6100      10.0        37       917        99
VIS    2025250     20200   16.9100  146.5700       9.9        38       917        99
VIS    2025250     20200   16.9300  146.4300      11.8        30       953        96
VIS    2025250     20200   16.9300  146.4000      11.0        39       972        96
VIS    2025250     20200   16.9300  146.3600      10.2        40       964        95
VIS    2025250     20200   16.9200  146.2800       9.4        38       951        93
VIS    2025250     20200   16.9300  146.2500      10.4        33       950        99
VIS    2025250     20200   16.9200  146.2500       9.9        32       906        97
VIS    2025250     20200   16.9300  146.1900       9.0        34       823        94
VIS    2025250     20200   16.9200  146.1700       8.2        33       823        92
VIS    2025250     20200   16.9100  146.1000       9.7        29       974        92
VIS    2025250     20200   16.9100  146.0700      11.4        30       976        98
VIS    2025250     20200   16.9200  146.0500      10.5        32       976        99
VIS    2025250     20200   16.9200  146.0300       9.9        33       940        99
VIS    2025250     20200   16.9100  143.6400      11.6        45       193        92
VIS    2025250     20200   16.9000  143.6400      11.8        44       193        91
VIS    2025250     20200   16.9100  143.6000      12.0        45       193        90
VIS    2025250     20200   16.9100  143.5400      11.8        59       192        90
VIS    2025250     20200   16.8900  143.3600      10.5        58       192        92
VIS    2025250     20200   16.9000  143.3500      10.4        61       192        95
VIS    2025250     20200   16.9000  143.3100      10.2        53       194        90
VIS    2025250     20200   16.8900  143.3000       9.2        60       194        99
VIS    2025250     20200   16.9000  143.2700      10.7        76       194        95
VIS    2025250     20200   16.9100  142.4000      15.6        98       119        90
VIS    2025250     20200   16.8900  142.1300      16.2       113       131        90
VIS    2025250     20200   16.8800  142.0900       9.5       134       131        91
VIS    2025250     20200   16.8900  142.0700      12.2       131       128        92
VIS    2025250     20200   16.8900  142.0400      15.1       141       131        99
VIS    2025250     20200   16.8900  142.0300      15.4       143       131        99
VIS    2025250     20200   16.8800  142.0100      16.3       147       130        98
VIS    2025250     20200   16.8800  141.9700      16.5       149       126        97
VIS    2025250     20200   16.9000  141.9600      14.3       147       128        98
VIS    2025250     20200   16.9000  141.9300      13.4       150       130        96
VIS    2025250     20200   16.8900  141.9200      15.2       155       128        95
VIS    2025250     20200   16.9000  141.8900      14.2       152       126        97
VIS    2025250     20200   16.8900  141.8700      12.9       157       125        91
VIS    2025250     20200   16.9000  141.8300      12.3       166       127        90
VIS    2025250     20200   16.8900  141.7500      13.0       173       132        95
VIS    2025250     20200   16.8900  141.7300      12.0       176       137        90
VIS    2025250     20200   16.8900  141.6600      12.0       176       147        91
VIS    2025250     20200   16.9300  148.5500       8.7        42       981        99
VIS    2025250     20200   16.9300  148.5300       8.8        42       966        98
VIS    2025250     20200   16.9300  148.5100       9.1        42       957        97
VIS    2025250     20200   16.9100  148.4900       9.2        43       971        98
VIS    2025250     20200   16.9100  148.3800       9.5        47       986        96
VIS    2025250     20200   16.9100  148.3700       9.0        46       986        97
VIS    2025250     20200   16.9200  148.3400       8.6        49       946        96
VIS    2025250     20200   16.9300  148.3300       8.5        51       921        99
VIS    2025250     20200   16.9100  148.2800       7.4        53       918        95
VIS    2025250     20200   16.9100  148.2700       7.6        49       927        90
VIS    2025250     20200   16.9000  147.2400      10.1        45       986        96
VIS    2025250     20200   16.9000  147.2200       9.9        45       974        96
VIS    2025250     20200   16.9000  147.2100       9.9        45       962        97
VIS    2025250     20200   16.9200  147.1800      10.1        47       958        97
VIS    2025250     20200   16.9000  146.8000      10.7        40       980        96
VIS    2025250     20200   16.8900  146.7900      10.0        41       965        95
VIS    2025250     20200   16.8900  146.7700       9.9        40       961        97
VIS    2025250     20200   16.8900  146.6600      10.1        43       972        94
VIS    2025250     20200   16.9100  146.6400      10.1        40       963        97
VIS    2025250     20200   16.9000  146.6100      10.3        33       944        99
VIS    2025250     20200   16.8900  146.6000      10.5        32       944        99
VIS    2025250     20200   16.9100  146.5600      10.1        37       934        99
VIS    2025250     20200   16.9000  146.5400      10.0        36       939       100
VIS    2025250     20200   16.8900  146.5300       9.6        41       939        99
VIS    2025250     20200   16.9000  146.3400       8.8        44       978        91
VIS    2025250     20200   16.8900  146.3300       8.4        40       952        92
VIS    2025250     20200   16.9100  146.3000       9.0        39       974        93
VIS    2025250     20200   16.9100  146.2800       9.3        38       950        97
VIS    2025250     20200   16.9000  146.2500       9.4        32       906        98
VIS    2025250     20200   16.9100  146.2300       9.5        31       805        91
VIS    2025250     20200   16.9000  146.1800       8.8        33       800        94
VIS    2025250     20200   16.8900  146.1600       8.8        33       799        94
VIS    2025250     20200   16.9000  146.1400       8.2        35       913        94
VIS    2025250     20200   16.8900  146.1100       8.9        35       938        94
VIS    2025250     20200   16.8900  146.0800      11.5        31       934        94
VIS    2025250     20200   16.9100  146.0700      11.6        30       976        98
VIS    2025250     20200   16.9000  146.0500      10.3        31       881        95
VIS    2025250     20200   16.8900  146.0200      10.1        32       820        93
VIS    2025250     20200   16.8900  143.6200      12.6        42       194        90
VIS    2025250     20200   16.8800  143.5000      11.2        45       195        93
VIS    2025250     20200   16.8800  143.3500      11.6        59       192        91
VIS    2025250     20200   16.8900  143.3100       9.3        58       194        98
VIS    2025250     20200   16.8900  143.2700       9.9        78       194        97
VIS    2025250     20200   16.8700  142.2600      14.8        93       134        92
VIS    2025250     20200   16.8600  142.1200      17.7       123       149        91
VIS    2025250     20200   16.8600  142.0700      16.8       140       143        91
VIS    2025250     20200   16.8600  142.0600      17.0       141       138        97
VIS    2025250     20200   16.8700  142.0300      16.5       144       135        98
VIS    2025250     20200   16.8700  142.0200      16.5       148       131        98
VIS    2025250     20200   16.8700  141.9700      17.4       150       128        97
VIS    2025250     20200   16.8700  141.9500      16.5       153       128        96
VIS    2025250     20200   16.8700  141.9300      17.1       159       126        93
VIS    2025250     20200   16.8600  141.8200      13.0       161       122        93
VIS    2025250     20200   16.8800  141.8000      12.4       165       123        90
VIS    2025250     20200   16.8600  141.7400      11.3       170       126        96
VIS    2025250     20200   16.8700  141.7300      11.4       172       132        93
VIS    2025250     20200   16.8700  141.6400      13.0       181       147        91
VIS    2025250     20200   16.9000  148.5200       9.2        43       976        96
VIS    2025250     20200   16.9000  148.5000       9.3        43       973        98
VIS    2025250     20200   16.9000  148.4900       9.3        43       973        97
VIS    2025250     20200   16.9000  148.3700       9.1        49       986        97
VIS    2025250     20200   16.8900  148.3500       8.4        55       986        93
VIS    2025250     20200   16.8900  148.3200       8.2        54       946        92
VIS    2025250     20200   16.8800  148.3200       8.2        53       935        91
VIS    2025250     20200   16.8900  147.2300      10.0        45       976        95
VIS    2025250     20200   16.8900  147.2200       9.5        45       972        96
VIS    2025250     20200   16.8900  147.1800       9.4        44       961        98
VIS    2025250     20200   16.8900  146.8200      10.0        39       975        97
VIS    2025250     20200   16.8800  146.8100       9.3        40       973        97
VIS    2025250     20200   16.8700  146.7700       9.6        40       958        99
VIS    2025250     20200   16.8700  146.7600       9.6        40       951        99
VIS    2025250     20200   16.8700  146.7400       9.5        40       951        97
VIS    2025250     20200   16.8900  146.6600      10.1        44       965        93
VIS    2025250     20200   16.8800  146.6400       9.3        40       943        96
VIS    2025250     20200   16.8900  146.6000      10.6        32       944        98
VIS    2025250     20200   16.8900  146.6000      10.6        32       938        98
VIS    2025250     20200   16.8700  146.5600      10.1        35       924        99
VIS    2025250     20200   16.8700  146.5300       9.0        42       935        96
VIS    2025250     20200   16.8700  146.3200       8.7        36       952        97
VIS    2025250     20200   16.8600  146.2900       9.3        34       952        98
VIS    2025250     20200   16.8700  146.2600       9.3        34       914        99
VIS    2025250     20200   16.8800  146.2500       9.1        34       912        99
VIS    2025250     20200   16.8800  146.2300       8.8        36       808        97
VIS    2025250     20200   16.8600  146.1700      10.6        31       797        92
VIS    2025250     20200   16.8800  146.1400       8.9        38       800        98
VIS    2025250     20200   16.8600  146.1200       8.6        43       907        98
VIS    2025250     20200   16.8800  146.1100       8.9        36       913        96
VIS    2025250     20200   16.8600  146.0400       8.7        30       799        95
VIS    2025250     20200   16.8600  143.4800      10.6        50       195        93
VIS    2025250     20200   16.8500  143.3200       9.3        60       195        97
VIS    2025250     20200   16.8400  142.3000      15.6        91       139        91
VIS    2025250     20200   16.8600  142.2800      14.6        93       139        90
VIS    2025250     20200   16.8600  142.2600      15.7        96       139        93
VIS    2025250     20200   16.8400  142.1000      17.8       129       152        93
VIS    2025250     20200   16.8400  142.0900      16.9       134       149        94
VIS    2025250     20200   16.8500  142.0700      16.9       138       144        96
VIS    2025250     20200   16.8400  142.0500      16.8       142       143        97
VIS    2025250     20200   16.8400  142.0200      16.5       149       142        96
VIS    2025250     20200   16.8500  142.0000      17.7       153       130        97
VIS    2025250     20200   16.8500  141.9700      18.6       152       130        95
VIS    2025250     20200   16.8400  141.7400      11.5       169       126        97
VIS    2025250     20200   16.8500  141.7300      10.9       170       126        96
VIS    2025250     20200   16.8500  141.7200      10.8       171       132        94
VIS    2025250     20200   16.8400  141.6200      14.2       180       147        90
VIS    2025250     20200   16.8600  148.5200       9.3        37       992        93
VIS    2025250     20200   16.8800  148.3200       8.3        53       935        90
VIS    2025250     20200   16.8700  148.2900       8.2        49       921        92
VIS    2025250     20200   16.8500  147.2600      10.1        45       987        96
VIS    2025250     20200   16.8600  147.2000       9.2        46       969        97
VIS    2025250     20200   16.8500  147.1900       9.7        46       963        98
VIS    2025250     20200   16.8500  146.9200       9.1        42       995        94
VIS    2025250     20200   16.8500  146.7800       8.8        39       958        99
VIS    2025250     20200   16.8600  146.7500       9.6        40       951        98
VIS    2025250     20200   16.8500  146.7300       9.8        40       951        92
VIS    2025250     20200   16.8400  146.7000      11.0        37       968        95
VIS    2025250     20200   16.8600  146.6800      10.7        40       943        96
VIS    2025250     20200   16.8500  146.6500       9.6        38       912        98
VIS    2025250     20200   16.8500  146.6300       9.8        38       912        98
VIS    2025250     20200   16.8500  146.6100       9.9        36       912        98
VIS    2025250     20200   16.8500  146.5900       9.7        36       907        98
VIS    2025250     20200   16.8600  146.5600       9.5        39       914        98
VIS    2025250     20200   16.8400  146.5400       9.5        40       911        93
VIS    2025250     20200   16.8600  146.5000       8.4        43       935        92
VIS    2025250     20200   16.8600  146.4900       8.4        39       935        93
VIS    2025250     20200   16.8500  146.4500       8.8        25       965        98
VIS    2025250     20200   16.8600  146.3100       9.1        36       957        97
VIS    2025250     20200   16.8500  146.3000       9.4        34       952        98
VIS    2025250     20200   16.8400  146.2600       9.2        38       906        99
VIS    2025250     20200   16.8400  146.2500       9.2        41       903        99
VIS    2025250     20200   16.8600  146.2300       8.7        41       803        97
VIS    2025250     20200   16.8400  146.1900      10.2        34       795        91
VIS    2025250     20200   16.8600  146.1700      10.8        31       796        92
VIS    2025250     20200   16.8400  146.1500       9.9        39       795        95
VIS    2025250     20200   16.8600  146.1200       8.6        44       907        97
VIS    2025250     20200   16.8600  146.1000       9.4        40       907        94
VIS    2025250     20200   16.8200  142.2900      15.8        90       143        90
VIS    2025250     20200   16.8100  142.2600      17.0        99       150        91
VIS    2025250     20200   16.8100  142.1700      18.2       119       165        92
VIS    2025250     20200   16.8200  142.1400      18.1       127       158        93
VIS    2025250     20200   16.8100  142.1200      19.3       130       158        94
VIS    2025250     20200   16.8200  142.0900      17.1       134       154        93
VIS    2025250     20200   16.8100  142.0800      16.4       137       154        94
VIS    2025250     20200   16.8200  142.0400      16.4       146       143        96
VIS    2025250     20200   16.8200  142.0300      16.0       147       143        96
VIS    2025250     20200   16.8100  142.0100      15.4       151       143        94
VIS    2025250     20200   16.8200  141.9700      18.1       154       131        94
VIS    2025250     20200   16.8200  141.9600      18.1       157       131        92
VIS    2025250     20200   16.8300  141.7200      11.6       170       126        97
VIS    2025250     20200   16.8300  141.7000      11.0       173       126        95
VIS    2025250     20200   16.8300  141.6700      11.0       179       136        92
VIS    2025250     20200   16.8500  148.2900       8.6        49       930        96
VIS    2025250     20200   16.8400  148.2800       8.9        48       930        97
VIS    2025250     20200   16.8300  147.2300      10.2        47       986        92
VIS    2025250     20200   16.8300  146.7600       9.2        38       951        99
VIS    2025250     20200   16.8300  146.7400       9.7        39       968        95
VIS    2025250     20200   16.8300  146.7200      10.4        37       968        93
VIS    2025250     20200   16.8400  146.7000      11.0        36       968        95
VIS    2025250     20200   16.8200  146.6800      10.8        31       904        92
VIS    2025250     20200   16.8300  146.6300       9.9        36       906        98
VIS    2025250     20200   16.8300  146.6300      10.1        37       906        98
VIS    2025250     20200   16.8200  146.5800       9.5        39       900        99
VIS    2025250     20200   16.8200  146.5800       9.7        39       900        99
VIS    2025250     20200   16.8200  146.5500      10.6        34       903        93
VIS    2025250     20200   16.8200  146.5300      10.1        34       906        93
VIS    2025250     20200   16.8200  146.4800       8.5        21       918        95
VIS    2025250     20200   16.8200  146.4500       9.2        24       955        97
VIS    2025250     20200   16.8200  146.4200       9.9        30       958        96
VIS    2025250     20200   16.8300  146.3500       9.2        41       934        90
VIS    2025250     20200   16.8200  146.3300       9.3        37       920        96
VIS    2025250     20200   16.8200  146.3100       9.9        34       920        99
VIS    2025250     20200   16.8100  146.2700       9.1        37       902        98
VIS    2025250     20200   16.8300  146.2600       9.1        40       903        99
VIS    2025250     20200   16.8300  146.2300       9.1        42       798        98
VIS    2025250     20200   16.8200  146.2000       9.5        37       793        94
VIS    2025250     20200   16.8300  146.1800       9.8        33       794        91
VIS    2025250     20200   16.8100  146.0900      10.1        31       799        91
VIS    2025250     20200   16.8100  146.0300       9.0        24       891        91
VIS    2025250     20200   16.8200  146.0200       9.1        26       891        90
VIS    2025250     20200   16.7900  142.2900      16.1        93       156        91
VIS    2025250     20200   16.7900  142.2800      16.5        96       158        92
VIS    2025250     20200   16.7900  142.2600      17.5        98       158        91
VIS    2025250     20200   16.8000  142.2200      20.2       117       166        91
VIS    2025250     20200   16.7900  142.2000      21.2       121       179        94
VIS    2025250     20200   16.8000  142.1800      19.4       119       167        92
VIS    2025250     20200   16.8000  142.1600      19.3       123       167        94
VIS    2025250     20200   16.7900  142.1400      21.6       128       165        95
VIS    2025250     20200   16.8100  142.1100      19.5       133       158        95
VIS    2025250     20200   16.7900  142.0800      17.1       143       158        95
VIS    2025250     20200   16.7900  142.0700      17.0       147       158        94
VIS    2025250     20200   16.7900  142.0400      16.5       148       154        93
VIS    2025250     20200   16.8100  142.0200      15.6       148       144        95
VIS    2025250     20200   16.7900  141.9900      16.6       151       140        95
VIS    2025250     20200   16.8000  141.9700      17.4       154       136        95
VIS    2025250     20200   16.7900  141.9500      16.4       159       136        93
VIS    2025250     20200   16.7900  141.7300      12.7       177       122        91
VIS    2025250     20200   16.8100  141.7100      11.7       174       123        94
VIS    2025250     20200   16.7900  141.6600      11.5       183       134        91
VIS    2025250     20200   16.8100  148.2900       8.9        50       941        95
VIS    2025250     20200   16.8100  148.2800       8.9        49       941        97
VIS    2025250     20200   16.8200  148.2400       8.7        49       925        99
VIS    2025250     20200   16.8100  147.2500       9.7        47       986        90
VIS    2025250     20200   16.8100  147.2300       9.9        47       986        92
VIS    2025250     20200   16.8200  147.2200      10.1        48       986        92
VIS    2025250     20200   16.7900  146.7400       9.3        36       976        96
VIS    2025250     20200   16.7900  146.7100       9.5        37       976        99
VIS    2025250     20200   16.7900  146.7100       9.5        37       976        98
VIS    2025250     20200   16.7900  146.6700       9.7        34       904        95
VIS    2025250     20200   16.7900  146.6500       9.4        35       902        96
VIS    2025250     20200   16.7900  146.6300       9.5        36       901        98
VIS    2025250     20200   16.8100  146.6100      10.0        36       901        98
VIS    2025250     20200   16.8100  146.5800       9.9        39       900        98
VIS    2025250     20200   16.8100  146.5500      11.3        32       903        90
VIS    2025250     20200   16.8100  146.5400      11.0        32       906        94
VIS    2025250     20200   16.8000  146.4400       8.8        26       946        91
VIS    2025250     20200   16.8100  146.4100      10.2        31       946        96
VIS    2025250     20200   16.8100  146.4000       9.8        33       956        91
VIS    2025250     20200   16.8000  146.3600       9.3        35       900        95
VIS    2025250     20200   16.8100  146.3500       9.2        39       919        94
VIS    2025250     20200   16.8100  146.3200       9.6        35       914        98
VIS    2025250     20200   16.8000  146.2800       8.9        38       896        99
VIS    2025250     20200   16.8100  146.2700       9.0        37       901        98
VIS    2025250     20200   16.7900  146.2400       8.3        39       895        91
VIS    2025250     20200   16.8000  146.2100       9.3        36       793        96
VIS    2025250     20200   16.8100  146.2000       9.4        35       793        94
VIS    2025250     20200   16.7900  146.1100       9.9        31       796        92
VIS    2025250     20200   16.8000  146.0900      10.0        29       799        91
VIS    2025250     20200   16.8100  146.0700       9.8        26       799        90
VIS    2025250     20200   16.7700  143.6300       9.9        38       197        91
VIS    2025250     20200   16.7800  142.2900      16.4        93       158        91
VIS    2025250     20200   16.7700  142.2700      19.5       100       172        96
VIS    2025250     20200   16.7800  142.2100      22.8       119       179        93
VIS    2025250     20200   16.7600  142.1700      25.8       122       192        95
VIS    2025250     20200   16.7600  142.1500      26.5       128       183        96
VIS    2025250     20200   16.7700  142.1300      24.8       129       177        96
VIS    2025250     20200   16.7800  142.1100      22.2       134       165        94
VIS    2025250     20200   16.7800  142.0600      17.5       148       157        94
VIS    2025250     20200   16.7800  142.0400      16.9       149       156        94
VIS    2025250     20200   16.7600  142.0200      18.0       151       154        93
VIS    2025250     20200   16.7800  141.9800      16.8       151       140        95
VIS    2025250     20200   16.7600  141.9700      17.2       154       136        96
VIS    2025250     20200   16.7600  141.9300      17.1       165       131        91
VIS    2025250     20200   16.7600  141.9200      17.3       167       131        90
VIS    2025250     20200   16.7800  141.7300      12.1       178       122        90
VIS    2025250     20200   16.7600  140.9500      11.6       147       190        91
VIS    2025250     20200   16.7800  148.2900       8.6        50       952        93
VIS    2025250     20200   16.7900  148.2700       8.7        49       937        97
VIS    2025250     20200   16.8000  148.2500       8.5        50       924        99
VIS    2025250     20200   16.7900  147.2300       9.0        48       980        93
VIS    2025250     20200   16.7900  147.2100       9.1        48       973        93
VIS    2025250     20200   16.7700  147.1900       9.1        46       973        96
VIS    2025250     20200   16.7800  147.1700       9.2        47       973        93
VIS    2025250     20200   16.7700  146.7400       9.8        35       991        97
VIS    2025250     20200   16.7700  146.7100       9.1        37       975        98
VIS    2025250     20200   16.7900  146.7100       9.3        37       975        97
VIS    2025250     20200   16.7800  146.6700       9.1        37       911        97
VIS    2025250     20200   16.7800  146.6500       9.2        36       903        97
VIS    2025250     20200   16.7700  146.6200       9.3        38       903        99
VIS    2025250     20200   16.7700  146.6100       9.3        39       903        98
VIS    2025250     20200   16.7700  146.5800       9.5        38       903        95
VIS    2025250     20200   16.7700  146.5000      10.0        28       896        92
VIS    2025250     20200   16.7800  146.4000       9.7        33       896        97
VIS    2025250     20200   16.7700  146.3900       9.5        35       898        98
VIS    2025250     20200   16.7700  146.3700       9.7        36       898        98
VIS    2025250     20200   16.7700  146.3400       9.2        36       898        98
VIS    2025250     20200   16.7800  146.3000       9.8        32       896        94
VIS    2025250     20200   16.7800  146.2500       8.1        36       895        96
VIS    2025250     20200   16.7800  146.2200       8.9        33       792        91
VIS    2025250     20200   16.7700  146.1800       8.7        22       793        90
VIS    2025250     20200   16.7800  146.1700       8.8        23       793        90
VIS    2025250     20200   16.7700  146.1100       9.6        26       796        92
VIS    2025250     20200   16.7700  146.1000       9.5        26       796        92
VIS    2025250     20200   16.7800  146.0800       9.8        23       808        91
VIS    2025250     20200   16.7800  146.0500       9.6        21       954       100
VIS    2025250     20200   16.7600  146.0100       9.3        25       965        95
VIS    2025250     20200   16.7600  146.0100       9.2        25       965        95
VIS    2025250     20200   16.7400  142.3900      12.8        74       132        93
VIS    2025250     20200   16.7500  142.3200      21.8        81       171        93
VIS    2025250     20200   16.7400  142.3100      23.7        90       177        93
VIS    2025250     20200   16.7600  142.1700      26.5       122       192        95
VIS    2025250     20200   16.7500  142.1300      27.9       129       183        96
VIS    2025250     20200   16.7400  142.1200      28.7       129       185        95
VIS    2025250     20200   16.7500  142.0900      23.8       144       173        99
VIS    2025250     20200   16.7400  142.0400      19.0       152       156        90
VIS    2025250     20200   16.7500  142.0100      18.5       152       151        94
VIS    2025250     20200   16.7400  141.9900      18.7       157       146        90
VIS    2025250     20200   16.7400  141.9800      18.4       158       139        95
VIS    2025250     20200   16.7500  141.9400      16.7       160       131        93
VIS    2025250     20200   16.7400  141.9300      17.4       165       131        90
VIS    2025250     20200   16.7500  141.6300      11.1       189       134        91
VIS    2025250     20200   16.7400  141.6200      10.8       188       134        91
VIS    2025250     20200   16.7400  141.6000      11.3       189       135        90
VIS    2025250     20200   16.7700  148.3200       8.9        48       980       100
VIS    2025250     20200   16.7800  148.3000       8.8        50       972        95
VIS    2025250     20200   16.7800  148.2700       8.5        49       930        95
VIS    2025250     20200   16.7700  148.2600       8.4        49       930        95
VIS    2025250     20200   16.7700  148.2400       8.4        47       920        94
VIS    2025250     20200   16.7500  147.0700       8.4        50       970        92
VIS    2025250     20200   16.7600  147.0500       8.3        53       977        91
VIS    2025250     20200   16.7500  146.9100       8.7        28       993        99
VIS    2025250     20200   16.7500  146.7500      10.0        38       993        90
VIS    2025250     20200   16.7600  146.7500      10.1        36       993        94
VIS    2025250     20200   16.7500  146.7000       9.3        38       943        97
VIS    2025250     20200   16.7500  146.6900       9.1        39       943        97
VIS    2025250     20200   16.7600  146.6500       9.1        39       911       100
VIS    2025250     20200   16.7500  146.6300       9.2        38       911       100
VIS    2025250     20200   16.7400  146.6200       9.1        36       912       100
VIS    2025250     20200   16.7600  146.5900       9.3        38       903        97
VIS    2025250     20200   16.7600  146.5800       9.5        38       903        96
VIS    2025250     20200   16.7500  146.5500       9.3        35       904        98
VIS    2025250     20200   16.7600  146.5200       9.9        33       898        93
VIS    2025250     20200   16.7600  146.5000      10.1        31       896        95
VIS    2025250     20200   16.7500  146.4600       9.9        29       898        92
VIS    2025250     20200   16.7500  146.4500       9.8        28       898        92
VIS    2025250     20200   16.7500  146.4300       9.9        29       896        96
VIS    2025250     20200   16.7600  146.3900       9.6        35       896        98
VIS    2025250     20200   16.7500  146.3800       9.2        40       900       100
VIS    2025250     20200   16.7500  146.3500       9.0        40       900        99
VIS    2025250     20200   16.7400  146.3300       8.7        40       902        96
VIS    2025250     20200   16.7400  146.2200       8.6        37       792        93
VIS    2025250     20200   16.7400  146.2100       8.5        36       792        92
VIS    2025250     20200   16.7400  146.1500       9.0        18       795        90
VIS    2025250     20200   16.7400  146.1400       8.9        20       796        91
VIS    2025250     20200   16.7400  146.1000       8.7        24       798        92
VIS    2025250     20200   16.7500  146.0800       9.1        25       821        93
VIS    2025250     20200   16.7600  146.0700       9.4        24       901        94
VIS    2025250     20200   16.7500  146.0200       9.5        24       960        96
VIS    2025250     20200   16.7500  146.0200       9.4        24       960        95
VIS    2025250     20200   16.7400  142.3900      12.2        73       132        93
VIS    2025250     20200   16.7300  142.3700      17.9        67       153        95
VIS    2025250     20200   16.7300  142.3600      19.2        66       158       100
VIS    2025250     20200   16.7200  142.3200      22.0        83       179        90
VIS    2025250     20200   16.7100  142.0600      23.1       141       174        95
VIS    2025250     20200   16.7300  142.0300      18.9       152       156        92
VIS    2025250     20200   16.7300  142.0300      18.9       152       155        92
VIS    2025250     20200   16.7300  142.0000      19.1       156       149        90
VIS    2025250     20200   16.7300  141.6600       9.3       182       120        92
VIS    2025250     20200   16.7300  141.6300       9.9       188       128        92
VIS    2025250     20200   16.7200  141.6200       9.8       189       128        90
VIS    2025250     20200   16.7100  141.6000      10.2       189       134        90
VIS    2025250     20200   16.7500  148.3200       8.9        46       980        99
VIS    2025250     20200   16.7400  148.2800       9.4        47       972        90
VIS    2025250     20200   16.7400  148.2100       8.4        47       946        90
VIS    2025250     20200   16.7300  147.2000       9.2        46       999        93
VIS    2025250     20200   16.7300  147.0900       8.7        43       969        96
VIS    2025250     20200   16.7300  147.0600       8.5        47       965        96
VIS    2025250     20200   16.7300  147.0600       8.4        47       965        94
VIS    2025250     20200   16.7300  146.9700       9.2        36       985        94
VIS    2025250     20200   16.7300  146.9600       9.4        35       996        93
VIS    2025250     20200   16.7300  146.9300       9.3        34       993        94
VIS    2025250     20200   16.7300  146.7300       9.9        39       942        94
VIS    2025250     20200   16.7400  146.7000       9.3        38       943        97
VIS    2025250     20200   16.7400  146.6800       9.1        39       933        96
VIS    2025250     20200   16.7400  146.6500       9.2        38       913        98
VIS    2025250     20200   16.7400  146.6200       9.0        34       912       100
VIS    2025250     20200   16.7400  146.5900       9.2        35       923        99
VIS    2025250     20200   16.7400  146.5800       9.5        35       914       100
VIS    2025250     20200   16.7300  146.5600       9.6        34       912       100
VIS    2025250     20200   16.7300  146.5400       9.7        35       908       100
VIS    2025250     20200   16.7200  146.5100       9.8        35       908        99
VIS    2025250     20200   16.7200  146.4800       9.8        32       904        97
VIS    2025250     20200   16.7400  146.4600       9.7        30       898        93
VIS    2025250     20200   16.7200  146.4300       9.5        30       896        96
VIS    2025250     20200   16.7300  146.4100       9.5        31       896        98
VIS    2025250     20200   16.7200  146.3800       9.0        40       901       100
VIS    2025250     20200   16.7300  146.3600       8.8        44       902        98
VIS    2025250     20200   16.7400  146.3300       8.7        40       902        94
VIS    2025250     20200   16.7300  146.3200       9.0        37       902        91
VIS    2025250     20200   16.7400  146.2100       8.5        35       792        95
VIS    2025250     20200   16.7200  146.2000       8.6        30       794        96
VIS    2025250     20200   16.7200  146.1600       9.2        18       795        91
VIS    2025250     20200   16.7200  146.1500       9.2        19       796        92
VIS    2025250     20200   16.7200  146.1100       8.8        22       798        92
VIS    2025250     20200   16.7300  146.0900       8.6        23       821        94
VIS    2025250     20200   16.7400  146.0800       8.6        26       826        92
VIS    2025250     20200   16.7400  146.0400       9.4        24       946        95
VIS    2025250     20200   16.7000  143.3600      12.4        33       195        94
VIS    2025250     20200   16.7100  143.3300      13.3        31       195        92
VIS    2025250     20200   16.7100  143.3300      13.3        32       195        93
VIS    2025250     20200   16.7000  143.2900      11.7        33       196        94
VIS    2025250     20200   16.7200  143.2800      10.1        38       196        90
VIS    2025250     20200   16.7000  142.4000      13.3        64       146        97
VIS    2025250     20200   16.7100  142.3600      18.1        63       159        99
VIS    2025250     20200   16.7100  142.3500      19.3        65       159       100
VIS    2025250     20200   16.7100  142.0500      23.7       141       174        98
VIS    2025250     20200   16.6900  141.6600      10.4       189       120        93
VIS    2025250     20200   16.6900  141.6300       8.8       185       121        92
VIS    2025250     20200   16.7000  141.5900      10.1       189       134        90
VIS    2025250     20200   16.7300  148.3000       9.7        46       972        92
VIS    2025250     20200   16.7300  148.2300       8.2        48       929        91
VIS    2025250     20200   16.7200  148.2200       8.3        44       938        93
VIS    2025250     20200   16.7000  147.2500       9.7        47       998        92
VIS    2025250     20200   16.7000  147.2400       9.7        47       998        91
VIS    2025250     20200   16.7100  147.2100       9.3        46       981        95
VIS    2025250     20200   16.7200  147.1800       9.0        46       979        96
VIS    2025250     20200   16.7100  147.1500       8.7        45       994        95
VIS    2025250     20200   16.7000  147.1400       9.1        46       994        94
VIS    2025250     20200   16.7000  147.1100       9.0        39       990        98
VIS    2025250     20200   16.7200  147.0800       8.5        43       970        96
VIS    2025250     20200   16.7000  147.0500       8.8        43       964        93
VIS    2025250     20200   16.7100  146.9700       8.8        34       984        93
VIS    2025250     20200   16.7100  146.9500       9.2        35       985        96
VIS    2025250     20200   16.7000  146.9000       8.8        29       969        98
VIS    2025250     20200   16.7000  146.8900       8.9        27       969        97
VIS    2025250     20200   16.7000  146.7900       9.5        39       970        95
VIS    2025250     20200   16.7100  146.7800       9.6        40       970        92
VIS    2025250     20200   16.7100  146.7500       9.5        40       941        91
VIS    2025250     20200   16.7200  146.6900       9.3        37       912        94
VIS    2025250     20200   16.7100  146.6700       9.4        35       912        99
VIS    2025250     20200   16.7100  146.6500       9.2        30       911        98
VIS    2025250     20200   16.7100  146.6300       8.9        29       911        99
VIS    2025250     20200   16.7100  146.5900       9.4        32       912        98
VIS    2025250     20200   16.7000  146.5800       9.5        32       912        97
VIS    2025250     20200   16.7200  146.5400      10.2        35       911        99
VIS    2025250     20200   16.7100  146.5200      10.3        36       911        98
VIS    2025250     20200   16.7100  146.5100       9.9        35       911        99
VIS    2025250     20200   16.7100  146.4700       9.5        30       908        97
VIS    2025250     20200   16.7000  146.4500       9.1        30       912        93
VIS    2025250     20200   16.6900  146.4400       9.3        32       920        94
VIS    2025250     20200   16.6900  146.3900       9.9        35       909        97
VIS    2025250     20200   16.7000  146.3900       9.6        37       906        97
VIS    2025250     20200   16.7000  146.3500       8.9        41       906        96
VIS    2025250     20200   16.7100  146.3300       9.1        38       904        95
VIS    2025250     20200   16.7100  146.3200       9.5        36       904        92
VIS    2025250     20200   16.6900  146.2800      10.0        33       902        92
VIS    2025250     20200   16.7000  146.2400       9.5        39       796        97
VIS    2025250     20200   16.6900  146.2000       9.8        30       794        94
VIS    2025250     20200   16.7100  146.2000       9.4        23       794        93
VIS    2025250     20200   16.7100  146.1500       9.4        20       796        92
VIS    2025250     20200   16.6900  146.1200       9.6        20       833        91
VIS    2025250     20200   16.6900  146.1000       9.5        23       935       100
VIS    2025250     20200   16.7100  146.0600       9.2        29       946        92
VIS    2025250     20200   16.7000  146.0500       9.7        28       946        90
VIS    2025250     20200   16.6800  143.4400      11.7        23       193        91
VIS    2025250     20200   16.6900  143.4200      11.0        31       192        92
VIS    2025250     20200   16.6900  143.3600      12.3        35       195        96
VIS    2025250     20200   16.6900  143.3300      13.0        30       195        94
VIS    2025250     20200   16.6900  143.3000      13.3        27       196        93
VIS    2025250     20200   16.6800  142.4100      14.3        56       146        95
VIS    2025250     20200   16.6800  142.3500      20.1        58       175        98
VIS    2025250     20200   16.6900  142.3400      21.1        60       175        98
VIS    2025250     20200   16.6800  141.6500      10.0       185       121        90
VIS    2025250     20200   16.6700  141.6100       9.7       187       128        91
VIS    2025250     20200   16.6600  141.5900      10.1       185       134        91
VIS    2025250     20200   16.6900  148.3200       9.0        49       989        90
VIS    2025250     20200   16.6900  148.3000       9.4        50       972        94
VIS    2025250     20200   16.6900  148.2600       9.5        49       929        94
VIS    2025250     20200   16.6900  148.2500       8.7        45       929        98
VIS    2025250     20200   16.7000  147.2500       9.6        46       998        94
VIS    2025250     20200   16.7000  147.2400       9.6        47       985        92
VIS    2025250     20200   16.6900  147.2200       9.7        47       981        95
VIS    2025250     20200   16.6900  147.1900       9.2        45       979        96
VIS    2025250     20200   16.6800  147.1700       9.2        45       968        95
VIS    2025250     20200   16.7000  147.1400       8.9        45       994        95
VIS    2025250     20200   16.7000  147.1100       8.9        42       990        95
VIS    2025250     20200   16.7000  147.1000       8.9        41       990        96
VIS    2025250     20200   16.6800  147.0600       9.2        40       964        97
VIS    2025250     20200   16.6800  147.0300       9.0        39       957        96
VIS    2025250     20200   16.6800  147.0100       8.9        38       964        94
VIS    2025250     20200   16.6800  146.9900       8.7        35       972        94
VIS    2025250     20200   16.6800  146.9800       8.7        34       972        95
VIS    2025250     20200   16.6800  146.9500       9.1        33       948        95
VIS    2025250     20200   16.6800  146.9100       8.9        27       943        98
VIS    2025250     20200   16.6900  146.8900       9.0        25       950        98
VIS    2025250     20200   16.6900  146.8600       8.7        26       973        99
VIS    2025250     20200   16.6800  146.8100       8.6        42       970        97
VIS    2025250     20200   16.6700  146.8100       8.7        40       970        97
VIS    2025250     20200   16.6800  146.7700       9.2        37       919        97
VIS    2025250     20200   16.6800  146.7400       9.0        38       916        93
VIS    2025250     20200   16.6800  146.6800       9.5        35       913        93
VIS    2025250     20200   16.6900  146.6500       9.4        30       910        99
VIS    2025250     20200   16.6800  146.6200       9.3        32       907        98
VIS    2025250     20200   16.6700  146.6100       9.8        33       906        95
VIS    2025250     20200   16.6800  146.5800       9.8        31       906        96
VIS    2025250     20200   16.6800  146.5700      10.2        33       906        97
VIS    2025250     20200   16.6800  146.5400      11.2        40       903        97
VIS    2025250     20200   16.6700  146.5000      11.0        35       932        98
VIS    2025250     20200   16.6800  146.3800       9.5        35       935        97
VIS    2025250     20200   16.6800  146.3600       9.4        37       916        98
VIS    2025250     20200   16.6700  146.3300      10.0        35       916        99
VIS    2025250     20200   16.6900  146.3100      10.1        33       906        96
VIS    2025250     20200   16.6700  146.2800      10.2        33       912        98
VIS    2025250     20200   16.6700  146.2600       9.8        37       903        99
VIS    2025250     20200   16.6800  146.2500       9.8        38       816        97
VIS    2025250     20200   16.6700  146.2200      10.1        36       801        96
VIS    2025250     20200   16.6700  146.1900       9.6        32       801        97
VIS    2025250     20200   16.6700  146.1600       9.5        29       817        96
VIS    2025250     20200   16.6900  146.1300       9.7        20       833        91
VIS    2025250     20200   16.6900  146.1000       9.7        23       939       100
VIS    2025250     20200   16.6700  146.0700      11.1        29       965        95
VIS    2025250     20200   16.6800  146.0400      10.0        30       956        96
VIS    2025250     20200   16.6900  146.0300      10.0        29       893        96
VIS    2025250     20200   16.6800  146.0100      10.2        24       849        91
VIS    2025250     20200   16.6500  143.5500      13.1        34       194        95
VIS    2025250     20200   16.6600  143.4200      11.7        33       195        95
VIS    2025250     20200   16.6500  143.3900      11.6        36       196        97
VIS    2025250     20200   16.6500  143.3700      12.1        30       196        92
VIS    2025250     20200   16.6600  141.6300      10.2       180       124        92
VIS    2025250     20200   16.6500  141.6200       9.7       180       124        94
VIS    2025250     20200   16.6600  141.6000      10.1       184       132        91
VIS    2025250     20200   16.6700  148.3100       8.4        49       980        91
VIS    2025250     20200   16.6700  148.2900       8.7        49       947        95
VIS    2025250     20200   16.6700  148.2800       9.0        48       929        95
VIS    2025250     20200   16.6700  148.2400       8.4        43       930        99
VIS    2025250     20200   16.6600  148.2300       8.2        40       936        97
VIS    2025250     20200   16.6600  147.2300       9.9        47       980        94
VIS    2025250     20200   16.6600  147.2100      10.0        47       974        94
VIS    2025250     20200   16.6600  147.2000       9.7        46       959        95
VIS    2025250     20200   16.6500  147.1700       9.8        45       967        96
VIS    2025250     20200   16.6600  147.1500       9.4        46       977        95
VIS    2025250     20200   16.6600  147.1000       9.5        46       970        93
VIS    2025250     20200   16.6500  147.0700      10.0        42       961        97
VIS    2025250     20200   16.6700  147.0300       9.2        38       957        97
VIS    2025250     20200   16.6600  146.9900       9.1        35       957       100
VIS    2025250     20200   16.6600  146.9900       9.0        34       958       100
VIS    2025250     20200   16.6600  146.9400       9.1        32       943        96
VIS    2025250     20200   16.6700  146.9300       9.1        31       943        96
VIS    2025250     20200   16.6600  146.9100       9.1        27       923        95
VIS    2025250     20200   16.6700  146.8900       8.9        25       922        97
VIS    2025250     20200   16.6500  146.8500       8.3        34       936        95
VIS    2025250     20200   16.6600  146.8200       8.2        38       970        98
VIS    2025250     20200   16.6700  146.8000       8.8        40       940        97
VIS    2025250     20200   16.6600  146.7800       9.1        37       930        97
VIS    2025250     20200   16.6600  146.7500       9.1        33       915        97
VIS    2025250     20200   16.6600  146.7400       9.3        33       915        97
VIS    2025250     20200   16.6500  146.7100      10.3        34       913        96
VIS    2025250     20200   16.6500  146.6800       9.8        33       913        92
VIS    2025250     20200   16.6500  146.6700       9.8        33       913        92
VIS    2025250     20200   16.6500  146.6000       9.9        33       906        94
VIS    2025250     20200   16.6500  146.5600       9.3        38       905       100
VIS    2025250     20200   16.6500  146.5500       9.6        43       905        99
VIS    2025250     20200   16.6500  146.4200       9.6        32       958        98
VIS    2025250     20200   16.6500  146.3800       9.1        36       957        99
VIS    2025250     20200   16.6600  146.3400       9.7        37       942        99
VIS    2025250     20200   16.6600  146.3200      10.4        34       924        99
VIS    2025250     20200   16.6600  146.2900      10.6        33       916        97
VIS    2025250     20200   16.6600  146.2800      10.2        34       916        98
VIS    2025250     20200   16.6500  146.2500      10.0        37       904        99
VIS    2025250     20200   16.6500  146.2300      10.5        35       816        94
VIS    2025250     20200   16.6400  146.2100      10.3        35       835        94
VIS    2025250     20200   16.6500  146.1800       9.6        32       823        96
VIS    2025250     20200   16.6600  146.1100      10.9        25       958        97
VIS    2025250     20200   16.6500  146.0900      11.9        28       958        95
VIS    2025250     20200   16.6600  146.0600      10.8        29       933        96
VIS    2025250     20200   16.6400  146.0300      10.2        27       801        93
VIS    2025250     20200   16.6300  142.3700      17.2        38       170        90
VIS    2025250     20200   16.6600  148.2900       8.6        49       931        93
VIS    2025250     20200   16.6400  148.2700       8.4        45       923        91
VIS    2025250     20200   16.6400  148.2500       8.3        38       922        92
VIS    2025250     20200   16.6400  147.2300       9.8        46       978        96
VIS    2025250     20200   16.6300  147.2100       9.4        44       974        96
VIS    2025250     20200   16.6400  147.1800       9.8        46       964        96
VIS    2025250     20200   16.6500  147.0800      10.0        43       961        96
VIS    2025250     20200   16.6500  147.0200       9.3        37       954        99
VIS    2025250     20200   16.6500  146.9900       9.1        35       958       100
VIS    2025250     20200   16.6500  146.9700       9.1        34       954       100
VIS    2025250     20200   16.6400  146.9500       9.5        34       942        98
VIS    2025250     20200   16.6500  146.9100       9.4        29       921        96
VIS    2025250     20200   16.6400  146.8900       9.3        30       915        98
VIS    2025250     20200   16.6300  146.8200       9.5        34       978        94
VIS    2025250     20200   16.6300  146.7900       9.7        34       936        99
VIS    2025250     20200   16.6300  146.7800       9.6        34       936        99
VIS    2025250     20200   16.6300  146.7500      10.0        32       913        97
VIS    2025250     20200   16.6300  146.7200      10.8        33       912        97
VIS    2025250     20200   16.6400  146.7000      10.4        34       912        97
VIS    2025250     20200   16.6400  146.6800       9.9        34       913        93
VIS    2025250     20200   16.6200  146.6600       9.4        33       909        90
VIS    2025250     20200   16.6300  146.6200      10.1        33       907        95
VIS    2025250     20200   16.6200  146.6000      10.3        32       907        97
VIS    2025250     20200   16.6200  146.5900      10.4        33       907        96
VIS    2025250     20200   16.6400  146.5600       9.3        38       906       100
VIS    2025250     20200   16.6200  146.4700      10.2        32       983        95
VIS    2025250     20200   16.6300  146.3500       9.6        38       957        98
VIS    2025250     20200   16.6300  146.3500       9.8        38       957        98
VIS    2025250     20200   16.6400  146.2900      10.9        32       943        98
VIS    2025250     20200   16.6300  146.2300      11.0        34       908        96
VIS    2025250     20200   16.6300  146.2200      10.9        33       852        91
VIS    2025250     20200   16.6200  146.1900      10.1        31       920        99
VIS    2025250     20200   16.6300  146.1800       9.8        30       939        99
VIS    2025250     20200   16.6200  146.1200      10.1        33       989        96
VIS    2025250     20200   16.6300  146.0900      11.5        32       951        90
VIS    2025250     20200   16.6300  146.0400       9.8        27       801        92
VIS    2025250     20200   16.6400  146.0300      10.1        27       801        93
VIS    2025250     20200   16.6000  143.2500      13.8        53       188        90
VIS    2025250     20200   16.6200  148.3000       8.9        48       972        92
VIS    2025250     20200   16.6200  148.2900       8.7        48       947        93
VIS    2025250     20200   16.6200  148.2600       8.1        43       922        95
VIS    2025250     20200   16.6100  147.1900       9.3        44       974        97
VIS    2025250     20200   16.6000  146.9100       9.8        34       945        99
VIS    2025250     20200   16.6200  146.8700      10.0        31       921        98
VIS    2025250     20200   16.6200  146.8000       9.9        33       966        97
VIS    2025250     20200   16.6200  146.7800       9.8        34       936        99
VIS    2025250     20200   16.6200  146.7500      10.3        32       913        97
VIS    2025250     20200   16.6200  146.7400      10.6        31       913        97
VIS    2025250     20200   16.6000  146.7000      10.8        34       912        98
VIS    2025250     20200   16.6000  146.7000      10.7        34       912        98
VIS    2025250     20200   16.6100  146.6600       9.7        33       909        92
VIS    2025250     20200   16.6100  146.6400       9.8        33       909        93
VIS    2025250     20200   16.6100  146.6100      10.4        31       908        96
VIS    2025250     20200   16.6200  146.6000      10.4        32       907        97
VIS    2025250     20200   16.6000  146.5700      10.3        32       931        98
VIS    2025250     20200   16.6000  146.5400       9.9        35       931        99
VIS    2025250     20200   16.6000  146.5300      10.0        35       947        99
VIS    2025250     20200   16.6100  146.4800      10.7        39       982        97
VIS    2025250     20200   16.6200  146.4700       9.9        31       983        94
VIS    2025250     20200   16.6200  146.3400      10.1        38       968        98
VIS    2025250     20200   16.6100  146.2200      10.7        33       947        94
VIS    2025250     20200   16.6100  146.1900      10.1        33       951        97
VIS    2025250     20200   16.6000  146.1600       9.4        36       951        95
VIS    2025250     20200   16.6000  146.1000       9.3        37       982        94
VIS    2025250     20200   16.5900  146.0700       9.1        38       961        95
VIS    2025250     20200   16.5900  146.0700       9.1        38       951        94
VIS    2025250     20200   16.5900  145.9000      11.5        35       947        93
VIS    2025250     20200   16.6000  148.3000       8.8        48       950        93
VIS    2025250     20200   16.5900  148.2900       8.5        46       923        96
VIS    2025250     20200   16.6100  148.2600       8.1        41       922        95
VIS    2025250     20200   16.6000  148.2400       8.0        37       927        93
VIS    2025250     20200   16.5800  147.1800       9.8        52       999        92
VIS    2025250     20200   16.5800  147.1700      10.0        51       999        93
VIS    2025250     20200   16.6000  146.9100       9.8        35       969        99
VIS    2025250     20200   16.6000  146.8000       9.8        34       966        98
VIS    2025250     20200   16.6000  146.7800       9.7        35       936        99
VIS    2025250     20200   16.6000  146.7700       9.8        35       936        99
VIS    2025250     20200   16.6000  146.7500      10.7        33       928        98
VIS    2025250     20200   16.5900  146.7200      10.9        33       928        98
VIS    2025250     20200   16.6000  146.7000      10.6        34       912        98
VIS    2025250     20200   16.5900  146.6600      10.6        33       911        95
VIS    2025250     20200   16.5800  146.6400      10.4        33       921        98
VIS    2025250     20200   16.5800  146.6200      10.5        31       935        98
VIS    2025250     20200   16.5800  146.6000      10.5        30       935        97
VIS    2025250     20200   16.5900  146.5800      10.5        31       935        98
VIS    2025250     20200   16.5900  146.5500       9.8        32       946        99
VIS    2025250     20200   16.5900  146.5300       9.8        32       956       100
VIS    2025250     20200   16.5700  146.5000      10.9        26       959        98
VIS    2025250     20200   16.5700  146.4700      10.5        31       954        99
VIS    2025250     20200   16.5800  146.4400      10.9        32       949        98
VIS    2025250     20200   16.5800  146.4300      10.6        33       949        98
VIS    2025250     20200   16.5900  146.4100       9.4        36       963        99
VIS    2025250     20200   16.5900  146.2900      11.3        35       971        97
VIS    2025250     20200   16.5800  146.2500      11.3        33       983        94
VIS    2025250     20200   16.5700  146.2300       9.8        31       971        97
VIS    2025250     20200   16.5800  146.2000       9.6        38       964        93
VIS    2025250     20200   16.5700  146.1800       9.5        38       933        95
VIS    2025250     20200   16.5900  146.1000       9.3        37       982        94
VIS    2025250     20200   16.5900  146.0700       9.1        38       951        94
VIS    2025250     20200   16.5700  145.9100      12.3        33       947        92
VIS    2025250     20200   16.5900  145.9000      11.6        35       947        94
VIS    2025250     20200   16.5700  145.8600       8.9        41       801        98
VIS    2025250     20200   16.5600  143.2700      13.0        27       196        90
VIS    2025250     20200   16.5500  141.0800      14.2       175       164        90
VIS    2025250     20200   16.5600  141.0700      14.4       170       165        90
VIS    2025250     20200   16.5800  148.3000       8.8        50       947        94
VIS    2025250     20200   16.5800  148.2900       8.6        48       934        96
VIS    2025250     20200   16.5800  148.2700       8.1        42       921        95
VIS    2025250     20200   16.5900  148.2500       7.9        38       922        94
VIS    2025250     20200   16.5700  147.1700       9.5        50       999        92
VIS    2025250     20200   16.5700  147.1600       9.7        51       999        93
VIS    2025250     20200   16.5600  147.1300       9.0        44       992        91
VIS    2025250     20200   16.5600  147.1100       8.6        38       966        90
VIS    2025250     20200   16.5600  146.5800      10.6        31       964        98
VIS    2025250     20200   16.5600  146.5700      10.3        31       964        98
VIS    2025250     20200   16.5500  146.5400       9.5        29       982        94
VIS    2025250     20200   16.5600  146.5100      10.5        26       983        99
VIS    2025250     20200   16.5600  146.5000      10.6        26       982        99
VIS    2025250     20200   16.5700  146.4700      10.4        32       949        99
VIS    2025250     20200   16.5700  146.4500      10.9        33       949        98
VIS    2025250     20200   16.5500  146.4100       9.1        32       909        98
VIS    2025250     20200   16.5600  146.3900       8.6        35       956        92
VIS    2025250     20200   16.5600  146.3700       9.2        34       958        97
VIS    2025250     20200   16.5600  146.3500       9.2        37       979        98
VIS    2025250     20200   16.5600  146.2200       9.7        31       964        96
VIS    2025250     20200   16.5600  146.2000       9.2        37       886        98
VIS    2025250     20200   16.5700  146.1700       9.4        39       915        97
VIS    2025250     20200   16.5700  146.1500       9.7        33       933        98
VIS    2025250     20200   16.5600  146.0500       9.6        34       969        92
VIS    2025250     20200   16.5700  146.0300      10.4        30       925        95
VIS    2025250     20200   16.5600  145.9500      12.1        31       961        92
VIS    2025250     20200   16.5500  145.9300      11.9        32       954        93
VIS    2025250     20200   16.5500  145.9200      12.0        32       947        93
VIS    2025250     20200   16.5500  145.8900      10.6        32       798        91
VIS    2025250     20200   16.5400  145.8500       9.0        36       798        95
VIS    2025250     20200   16.5600  145.8300       8.9        40       812        94
VIS    2025250     20200   16.5300  141.5800      12.7       176       128        97
VIS    2025250     20200   16.5300  141.2400      11.2       174       162        91
VIS    2025250     20200   16.5400  141.0700      13.8       174       165        94
VIS    2025250     20200   16.5600  148.3000       8.8        50       949        96
VIS    2025250     20200   16.5600  148.2900       8.8        50       934        95
VIS    2025250     20200   16.5400  148.2600       8.4        45       924        93
VIS    2025250     20200   16.5300  147.2100       9.8        46       982        90
VIS    2025250     20200   16.5500  147.1900       9.0        46       997        90
VIS    2025250     20200   16.5400  147.1700       9.1        43       977        93
VIS    2025250     20200   16.5400  147.1400       8.9        43       977        95
VIS    2025250     20200   16.5400  147.1200       8.6        43       954        94
VIS    2025250     20200   16.5500  147.1100       8.4        40       966        91
VIS    2025250     20200   16.5400  146.5600       9.5        30       982        94
VIS    2025250     20200   16.5400  146.5300       9.6        29       983        96
VIS    2025250     20200   16.5500  146.5200       9.8        29       983        98
VIS    2025250     20200   16.5300  146.5000      10.0        29       916        98
VIS    2025250     20200   16.5300  146.4800      10.1        30       908        98
VIS    2025250     20200   16.5200  146.4400       9.6        35       902        96
VIS    2025250     20200   16.5300  146.4300       9.4        34       902        94
VIS    2025250     20200   16.5300  146.4100       9.2        33       909        96
VIS    2025250     20200   16.5400  146.3600       9.1        33       958        99
VIS    2025250     20200   16.5400  146.3600       9.2        33       958        99
VIS    2025250     20200   16.5300  146.2300       9.7        27       948        98
VIS    2025250     20200   16.5200  146.1900       9.7        29       851        93
VIS    2025250     20200   16.5400  146.1800       9.6        33       933        98
VIS    2025250     20200   16.5200  146.1600       9.9        25       941        99
VIS    2025250     20200   16.5300  145.9900      11.0        31       959        92
VIS    2025250     20200   16.5200  145.9300       9.9        33       925        98
VIS    2025250     20200   16.5300  145.9200      10.4        33       925        98
VIS    2025250     20200   16.5200  145.8900       9.8        29       799        91
VIS    2025250     20200   16.5400  145.8500       9.1        34       798        95
VIS    2025250     20200   16.5400  149.5400       7.7        65       995        90
VIS    2025250     20200   16.5200  148.3100       8.5        53       949        94
VIS    2025250     20200   16.5300  148.2900       8.8        49       949        97
VIS    2025250     20200   16.5200  148.2800       8.3        46       937        98
VIS    2025250     20200   16.5200  147.2400       9.9        47       982        93
VIS    2025250     20200   16.5100  147.2200       9.8        47       982        92
VIS    2025250     20200   16.5100  147.1900       9.3        44       977        93
VIS    2025250     20200   16.5300  147.1700       9.1        42       977        93
VIS    2025250     20200   16.5200  147.1400       8.7        43       948        94
VIS    2025250     20200   16.5100  147.1300       8.4        43       941        93
VIS    2025250     20200   16.5100  147.0900       8.6        48       965        92
VIS    2025250     20200   16.5100  147.0800       8.6        48       965        92
VIS    2025250     20200   16.5100  147.0600       8.9        46       992        90
VIS    2025250     20200   16.5000  146.5700       9.7        30       988        95
VIS    2025250     20200   16.5200  146.5300       9.4        30       982        96
VIS    2025250     20200   16.5100  146.5200       9.3        34       947        98
VIS    2025250     20200   16.5000  146.4900       9.5        34       916        97
VIS    2025250     20200   16.5000  146.4600      10.0        31       907        93
VIS    2025250     20200   16.5100  146.4500      10.0        31       905        92
VIS    2025250     20200   16.5000  146.4200       9.4        36       902        98
VIS    2025250     20200   16.5000  146.3900       9.8        32       904        99
VIS    2025250     20200   16.5000  146.3600       9.4        29       909        99
VIS    2025250     20200   16.5000  146.3500       9.1        28       939        99
VIS    2025250     20200   16.5000  146.2500      10.3        31       948        99
VIS    2025250     20200   16.5000  146.2300       9.8        32       923        97
VIS    2025250     20200   16.5200  146.1900       9.7        29       851        92
VIS    2025250     20200   16.5100  146.1900       9.6        28       851        92
VIS    2025250     20200   16.5100  146.1500       9.7        21       945        98
VIS    2025250     20200   16.5000  146.1300       9.6        20       911        96
VIS    2025250     20200   16.5000  146.1200       9.5        21       948        99
VIS    2025250     20200   16.5100  146.0200      10.5        33       980        93
VIS    2025250     20200   16.5200  146.0000      10.1        32       959        96
VIS    2025250     20200   16.5000  145.9300       8.8        37       925        96
VIS    2025250     20200   16.5100  145.9100       9.0        37       815        99
VIS    2025250     20200   16.5100  145.8800       9.3        29       799        96
VIS    2025250     20200   16.5100  145.8700       9.3        26       799        92
VIS    2025250     20200   16.5100  145.8400       8.8        26       804        91
VIS    2025250     20200   16.4800  141.5900      13.6       187       127        91
VIS    2025250     20200   16.4900  141.5800      14.4       185       128        91
VIS    2025250     20200   16.5000  148.4600      10.6        45       985        95
VIS    2025250     20200   16.5100  148.3000       8.5        53       949        98
VIS    2025250     20200   16.5100  148.2900       8.4        49       937        98
VIS    2025250     20200   16.4900  148.2700       7.5        47       937        98
VIS    2025250     20200   16.5000  147.2300       9.7        47       982        94
VIS    2025250     20200   16.4900  147.2000       9.9        47       981        94
VIS    2025250     20200   16.4900  147.1900       9.6        45       981        95
VIS    2025250     20200   16.5000  147.1600       8.8        42       948        95
VIS    2025250     20200   16.4900  147.1100       8.6        46       938        95
VIS    2025250     20200   16.5000  147.1000       8.5        48       948        94
VIS    2025250     20200   16.5000  147.0800       8.7        49       966        92
VIS    2025250     20200   16.4900  147.0200       8.4        39       967        97
VIS    2025250     20200   16.4800  146.9900       8.8        39       984        97
VIS    2025250     20200   16.4900  146.5300       9.1        34       970        97
VIS    2025250     20200   16.5000  146.5100       9.2        35       945        98
VIS    2025250     20200   16.5000  146.4900       9.5        34       916        98
VIS    2025250     20200   16.4900  146.4600       9.9        32       907        95
VIS    2025250     20200   16.4900  146.4500       9.8        33       907        95
VIS    2025250     20200   16.4800  146.4200       9.5        32       906        96
VIS    2025250     20200   16.4900  146.3900      10.0        32       903        96
VIS    2025250     20200   16.4800  146.3700       9.8        30       905        94
VIS    2025250     20200   16.5000  146.3600       9.4        28       913        99
VIS    2025250     20200   16.4800  146.3200       8.9        32       939        91
VIS    2025250     20200   16.4800  146.2600       9.2        26       950        99
VIS    2025250     20200   16.4800  146.2600       9.5        27       971       100
VIS    2025250     20200   16.4900  146.2300       9.9        32       923        98
VIS    2025250     20200   16.4700  146.2000       9.1        27       806        92
VIS    2025250     20200   16.4800  146.1900       9.1        27       813        95
VIS    2025250     20200   16.4700  146.1400       9.4        26       800        95
VIS    2025250     20200   16.4900  146.1300       9.3        22       875        93
VIS    2025250     20200   16.4900  146.1100       8.6        28       893        96
VIS    2025250     20200   16.4700  146.0000      11.3        24       959        96
VIS    2025250     20200   16.4800  145.9900      11.0        24       965        96
VIS    2025250     20200   16.4700  145.9500       8.3        35       963        92
VIS    2025250     20200   16.4900  145.9300       8.5        37       925        93
VIS    2025250     20200   16.4700  145.9000       8.6        34       801        98
VIS    2025250     20200   16.4900  145.8800       9.3        28       799        94
VIS    2025250     20200   16.4700  145.8000       7.8        21       893        93
VIS    2025250     20200   16.4700  145.7700      10.2        20       918        90
VIS    2025250     20200   16.4600  141.2500      15.1       180       168        92
VIS    2025250     20200   16.4500  141.0800      14.7       175       163        94
VIS    2025250     20200   16.4500  141.0600      14.7       176       163        92
VIS    2025250     20200   16.4500  141.0100      14.7       176       168        94
VIS    2025250     20200   16.4500  141.0000      14.7       174       169        90
VIS    2025250     20200   16.4800  148.4800       9.4        46       999        94
VIS    2025250     20200   16.4800  148.3100       8.5        50       937        98
VIS    2025250     20200   16.4900  148.2700       7.5        48       937        97
VIS    2025250     20200   16.4900  148.2600       7.5        46       937        97
VIS    2025250     20200   16.4800  148.1000       8.4        45       984        95
VIS    2025250     20200   16.4700  148.1000       8.5        47       984        95
VIS    2025250     20200   16.4800  147.2300       9.6        47       982        93
VIS    2025250     20200   16.4800  147.2000      10.0        47       981        92
VIS    2025250     20200   16.4600  147.1700       9.1        44       954        97
VIS    2025250     20200   16.4600  146.9600       9.4        37       981        99
VIS    2025250     20200   16.4600  146.9200       9.1        38       983        96
VIS    2025250     20200   16.4600  146.5100       9.5        33       979        97
VIS    2025250     20200   16.4700  146.4900       9.5        35       944        99
VIS    2025250     20200   16.4600  146.4600       9.7        35       917        99
VIS    2025250     20200   16.4500  146.4400       9.8        33       917        99
VIS    2025250     20200   16.4600  146.4200       9.7        31       915        93
VIS    2025250     20200   16.4500  146.3500       9.3        34       907        91
VIS    2025250     20200   16.4500  146.2700       9.4        28       950        90
VIS    2025250     20200   16.4700  146.2400       9.6        27       911        91
VIS    2025250     20200   16.4500  146.1600      10.1        26       799        91
VIS    2025250     20200   16.4500  146.1500       9.7        29       800        95
VIS    2025250     20200   16.4700  146.1300       9.0        30       809        97
VIS    2025250     20200   16.4500  146.0400      10.3        26       977        96
VIS    2025250     20200   16.4500  146.0300      10.0        27       977        96
VIS    2025250     20200   16.4500  146.0000      10.7        25       957        98
VIS    2025250     20200   16.4700  145.9600       9.8        25       961        94
VIS    2025250     20200   16.4700  145.9600       9.2        28       963        97
VIS    2025250     20200   16.4500  145.9300       8.0        37       923        96
VIS    2025250     20200   16.4500  145.9100       8.6        33       843        92
VIS    2025250     20200   16.4700  145.7900       9.2        20       918        95
VIS    2025250     20200   16.4500  145.7600      10.1        18       797        90
VIS    2025250     20200   16.4500  145.7200      10.0        13       954        94
VIS    2025250     20200   16.4400  141.2600      20.1       179       168        97
VIS    2025250     20200   16.4300  141.2400      21.4       177       170        93
VIS    2025250     20200   16.4300  141.2200      19.1       176       170        95
VIS    2025250     20200   16.4400  141.1000      11.5       174       162        91
VIS    2025250     20200   16.4400  141.0700      15.3       174       163        94
VIS    2025250     20200   16.4400  141.0100      14.9       175       168        95
VIS    2025250     20200   16.4300  140.9900      15.3       172       170        95
VIS    2025250     20200   16.4200  140.9600      14.3       174       172        97
VIS    2025250     20200   16.4200  140.9400      14.2       174       172        95
VIS    2025250     20200   16.4500  148.3400       8.7        48       984        93
VIS    2025250     20200   16.4500  148.3300       8.2        49       980        94
VIS    2025250     20200   16.4600  148.3100       8.3        50       944        96
VIS    2025250     20200   16.4500  148.2800       7.8        52       942        96
VIS    2025250     20200   16.4600  148.1100       8.4        48       984        95
VIS    2025250     20200   16.4500  146.9800       8.7        38       984        97
VIS    2025250     20200   16.4500  146.9600       9.4        37       980        99
VIS    2025250     20200   16.4500  146.4900       9.9        35       960        96
VIS    2025250     20200   16.4500  146.4800      10.0        36       952        97
VIS    2025250     20200   16.4300  146.4100       9.9        31       919        98
VIS    2025250     20200   16.4400  146.3400       9.2        34       908        92
VIS    2025250     20200   16.4300  146.3100      10.4        28       927        95
VIS    2025250     20200   16.4300  146.2800      10.3        28       950        95
VIS    2025250     20200   16.4300  146.2600       9.9        29       941        93
VIS    2025250     20200   16.4300  146.1400       9.4        31       817        91
VIS    2025250     20200   16.4400  146.1200       9.3        30       811        92
VIS    2025250     20200   16.4400  146.0000      11.0        26       974        98
VIS    2025250     20200   16.4400  146.0000      10.8        26       957        98
VIS    2025250     20200   16.4300  145.9100       8.6        30       875        97
VIS    2025250     20200   16.4200  145.8900       9.4        36       843        96
VIS    2025250     20200   16.4300  145.8700       8.0        38       841        98
VIS    2025250     20200   16.4200  145.7200      10.2        13       914        94
VIS    2025250     20200   16.4200  145.6600       9.6        11       959        90
VIS    2025250     20200   16.4300  145.6500       9.3        18       959        98
VIS    2025250     20200   16.4000  141.1900      13.1       175       164        94
VIS    2025250     20200   16.4000  140.9900      14.0       174       173        98
VIS    2025250     20200   16.4100  140.9600      13.1       177       173        97
VIS    2025250     20200   16.4100  140.9500      12.7       177       173        97
VIS    2025250     20200   16.4400  148.3900       9.4        47       979        97
VIS    2025250     20200   16.4400  148.3300       8.5        48       980        98
VIS    2025250     20200   16.4300  147.1300       9.9        44       973        96
VIS    2025250     20200   16.4200  147.1100       9.8        43       975        94
VIS    2025250     20200   16.4200  146.9200       9.6        39       967        98
VIS    2025250     20200   16.4200  146.4100       9.8        32       920       100
VIS    2025250     20200   16.4200  146.3800       9.5        31       919        99
VIS    2025250     20200   16.4000  146.3500      10.0        28       927        98
VIS    2025250     20200   16.4100  146.3300      10.0        28       926        97
VIS    2025250     20200   16.4200  146.3100      10.4        27       926        94
VIS    2025250     20200   16.4000  146.2900      10.6        28       963        99
VIS    2025250     20200   16.4100  146.2600      10.4        29       951        99
VIS    2025250     20200   16.4100  146.2400      10.3        29       911        98
VIS    2025250     20200   16.4100  146.2200       9.6        30       901        99
VIS    2025250     20200   16.4100  146.1800       9.2        30       911        99
VIS    2025250     20200   16.4000  146.1800       9.4        29       915       100
VIS    2025250     20200   16.4100  146.0400      10.2        32       977        94
VIS    2025250     20200   16.4200  146.0300      10.4        31       977        97
VIS    2025250     20200   16.4100  145.9900      10.1        28       957        97
VIS    2025250     20200   16.4200  145.9000       9.4        33       843        96
VIS    2025250     20200   16.4200  145.8900       9.5        35       843        95
VIS    2025250     20200   16.4000  145.8500       7.8        27       841        95
VIS    2025250     20200   16.4200  145.8200       8.6        24       851        93
VIS    2025250     20200   16.4100  145.8000       9.5        20       800        92
VIS    2025250     20200   16.4000  145.7800       9.8        15       796        90
VIS    2025250     20200   16.4100  145.7100      10.3        12       914        94
VIS    2025250     20200   16.4000  145.6800      10.3        11       886        91
VIS    2025250     20200   16.4000  145.6700      10.9         9       950        95
VIS    2025250     20200   16.3900  141.5800      11.8       187       128        93
VIS    2025250     20200   16.3900  141.1700      16.3       170       164        91
VIS    2025250     20200   16.3900  140.9900      14.2       174       171        96
VIS    2025250     20200   16.3800  140.9800      13.8       175       173        98
VIS    2025250     20200   16.3900  140.9500      12.6       180       173        97
VIS    2025250     20200   16.3900  140.9400      12.5       179       173        96
VIS    2025250     20200   16.4100  148.4300       9.2        45       988        99
VIS    2025250     20200   16.4000  148.3900       8.8        47       973        96
VIS    2025250     20200   16.4000  148.3800       9.0        46       974        98
VIS    2025250     20200   16.3900  147.0900       8.5        43       987        91
VIS    2025250     20200   16.3900  147.0900       8.4        42       996        92
VIS    2025250     20200   16.3900  146.9300       9.6        40       967        96
VIS    2025250     20200   16.4000  146.9100       9.9        38       967        98
VIS    2025250     20200   16.3800  146.3800      10.3        31       970        98
VIS    2025250     20200   16.3800  146.3700      10.3        31       941        98
VIS    2025250     20200   16.3800  146.3600      10.3        30       941        98
VIS    2025250     20200   16.3900  146.3300      10.6        27       933        98
VIS    2025250     20200   16.3900  146.2800      10.6        30       963        99
VIS    2025250     20200   16.3900  146.2400      10.9        29       951        97
VIS    2025250     20200   16.3900  146.2400      10.7        29       941        98
VIS    2025250     20200   16.3900  146.1900       9.4        31       948        98
VIS    2025250     20200   16.4000  146.1800       9.5        29       928        99
VIS    2025250     20200   16.4000  146.1500       9.6        28       848        93
VIS    2025250     20200   16.3800  146.0300      10.5        28       920        97
VIS    2025250     20200   16.3900  146.0200      10.1        28       933        97
VIS    2025250     20200   16.3800  145.9800       9.9        26       925        93
VIS    2025250     20200   16.3800  145.9700       9.7        26       933        96
VIS    2025250     20200   16.3800  145.9500       9.9        26       940        96
VIS    2025250     20200   16.3800  145.8800       9.3        27       921        92
VIS    2025250     20200   16.3800  145.8500       8.6        29       910        90
VIS    2025250     20200   16.3900  145.8300       9.0        24       812        94
VIS    2025250     20200   16.3800  145.7800       9.7        16       796        90
VIS    2025250     20200   16.3800  145.7800       9.7        15       794        90
VIS    2025250     20200   16.3800  145.7200       9.5        20       796        94
VIS    2025250     20200   16.3900  145.6900      10.3        11       886        92
VIS    2025250     20200   16.3900  145.6700      11.2         8       950        95
VIS    2025250     20200   16.3700  141.1800      18.1       173       163        91
VIS    2025250     20200   16.3600  141.0100      14.1       172       172        96
VIS    2025250     20200   16.3600  140.9900      14.1       174       172        98
VIS    2025250     20200   16.3700  140.9700      13.9       175       173        98
VIS    2025250     20200   16.3600  140.9400      12.8       179       173        91
VIS    2025250     20200   16.3700  148.1000       9.6        41       995        97
VIS    2025250     20200   16.3700  147.1000       8.8        45       975        91
VIS    2025250     20200   16.3700  147.0700       8.5        44       964        90
VIS    2025250     20200   16.3800  146.8900       9.8        38       978        99
VIS    2025250     20200   16.3500  146.3600      10.7        31       970        99
VIS    2025250     20200   16.3600  146.3400      10.8        29       957        99
VIS    2025250     20200   16.3600  146.3300      10.9        29       960        99
VIS    2025250     20200   16.3600  146.2600      11.1        30       975        98
VIS    2025250     20200   16.3700  146.2400      10.9        30       960        97
VIS    2025250     20200   16.3700  146.1900      10.0        31       956        97
VIS    2025250     20200   16.3700  146.0200      10.5        26       920        98
VIS    2025250     20200   16.3700  146.0200      10.6        26       920        98
VIS    2025250     20200   16.3500  145.9900       9.7        25       936        98
VIS    2025250     20200   16.3700  145.9600       9.6        27       936        93
VIS    2025250     20200   16.3700  145.9400       9.7        28       942        97
VIS    2025250     20200   16.3500  145.9100      10.3        30       970        95
VIS    2025250     20200   16.3600  145.8900      10.3        29       921        99
VIS    2025250     20200   16.3600  145.8500       9.2        31       830        92
VIS    2025250     20200   16.3500  145.7800       9.4        15       794        90
VIS    2025250     20200   16.3600  145.7600       9.3        16       794        91
VIS    2025250     20200   16.3600  145.7300       9.3        18       796        92
VIS    2025250     20200   16.3400  141.6900      10.9       180       119        96
VIS    2025250     20200   16.3300  141.6900      10.8       180       119        96
VIS    2025250     20200   16.3400  140.9800      13.6       175       173        92
VIS    2025250     20200   16.3400  140.9600      13.6       175       171        94
VIS    2025250     20200   16.3300  140.9500      13.6       175       171        92
VIS    2025250     20200   16.3500  148.3800       8.9        48       983        97
VIS    2025250     20200   16.3600  148.1500       9.1        39       989        98
VIS    2025250     20200   16.3500  148.1400       9.1        42       989        99
VIS    2025250     20200   16.3400  147.0900       8.8        47       967        90
VIS    2025250     20200   16.3400  147.0800       8.8        45       963        92
VIS    2025250     20200   16.3500  146.9000       9.5        38       978        98
VIS    2025250     20200   16.3500  146.2000      10.8        31       956        96
VIS    2025250     20200   16.3400  146.1800      10.2        33       955        96
VIS    2025250     20200   16.3400  146.1700      10.1        32       939        97
VIS    2025250     20200   16.3400  146.0200      11.1        24       922        97
VIS    2025250     20200   16.3400  145.9800       9.7        25       936        99
VIS    2025250     20200   16.3300  145.9600       9.1        32       942        93
VIS    2025250     20200   16.3300  145.9200       9.0        31       953        97
VIS    2025250     20200   16.3300  145.9200       9.0        31       953        98
VIS    2025250     20200   16.3500  145.8800       9.8        29       855        93
VIS    2025250     20200   16.3500  145.8700       9.8        27       830        92
VIS    2025250     20200   16.3100  141.7000      10.7       182       119        94
VIS    2025250     20200   16.3200  141.6800      11.0       180       119        97
VIS    2025250     20200   16.3100  141.6400       9.3       190       126        90
VIS    2025250     20200   16.3000  141.6400      10.1       188       129        91
VIS    2025250     20200   16.3100  141.2200      16.4       172       171        93
VIS    2025250     20200   16.3100  140.9800      13.9       180       174        95
VIS    2025250     20200   16.3100  140.9600      13.0       177       174        90
VIS    2025250     20200   16.3200  140.9500      13.6       175       174        90
VIS    2025250     20200   16.3100  140.9200      14.0       179       177        94
VIS    2025250     20200   16.3400  148.1400       9.4        43       989        99
VIS    2025250     20200   16.3400  148.1300       9.4        42       989        99
VIS    2025250     20200   16.3300  147.1300       9.0        45       986        92
VIS    2025250     20200   16.3200  147.1000       9.1        42       975        96
VIS    2025250     20200   16.3300  147.0700       9.0        43       960        95
VIS    2025250     20200   16.3100  147.0500       9.1        39       945        96
VIS    2025250     20200   16.3200  147.0300       8.8        39       946        93
VIS    2025250     20200   16.3200  147.0000       8.3        43       960        94
VIS    2025250     20200   16.3200  146.1900      10.5        34       969        94
VIS    2025250     20200   16.3100  145.9500       9.2        32       942        91
VIS    2025250     20200   16.3200  145.9300       8.8        31       942        96
VIS    2025250     20200   16.3200  145.8900       9.2        29       820        95
VIS    2025250     20200   16.3100  145.8800       8.9        29       816        90
VIS    2025250     20200   16.3000  145.6200       8.8        27       898        95
VIS    2025250     20200   16.3000  141.2300      14.8       174       171        94
VIS    2025250     20200   16.2900  141.2100      12.6       174       173        94
VIS    2025250     20200   16.2800  140.9700      13.0       178       175        97
VIS    2025250     20200   16.2800  140.9500      13.1       178       175        93
VIS    2025250     20200   16.2700  140.9300      12.9       179       175        96
VIS    2025250     20200   16.2900  140.9200      13.8       179       177        98
VIS    2025250     20200   16.2800  140.8700      11.3       178       191        94
VIS    2025250     20200   16.2700  140.8500      12.0       172       190        95
VIS    2025250     20200   16.2800  140.8300      12.2       168       191        91
VIS    2025250     20200   16.2900  140.8100      12.3       162       193        90
VIS    2025250     20200   16.3000  147.1100       8.8        42       986        96
VIS    2025250     20200   16.3100  147.0900       8.9        42       967        96
VIS    2025250     20200   16.3000  147.0700       9.2        39       960        96
VIS    2025250     20200   16.3100  147.0000       8.8        36       969        97
VIS    2025250     20200   16.2900  146.9700       8.5        41       978        96
VIS    2025250     20200   16.2800  145.9400       9.4        31       849        94
VIS    2025250     20200   16.2800  145.9100       9.2        33       809        96
VIS    2025250     20200   16.2900  145.9000       8.4        31       809        96
VIS    2025250     20200   16.2800  145.7900       7.7        31       800        90
VIS    2025250     20200   16.2800  145.6700      10.2        13       796        90
VIS    2025250     20200   16.2800  145.6500      10.1        16       798        90
VIS    2025250     20200   16.2700  140.9600      13.0       179       175        98
VIS    2025250     20200   16.2700  140.9500      13.0       179       175        96
VIS    2025250     20200   16.2600  140.8500      11.2       176       190        92
VIS    2025250     20200   16.2500  140.8300      12.3       174       190        95
VIS    2025250     20200   16.2700  147.0700       9.1        40       970        97
VIS    2025250     20200   16.2800  146.9700       8.3        43       980        95
VIS    2025250     20200   16.2600  146.9500       8.0        45       977        94
VIS    2025250     20200   16.2600  146.1000      10.5        27       976        95
VIS    2025250     20200   16.2600  146.0800      10.4        29       976        96
VIS    2025250     20200   16.2700  146.0500      10.1        27       976        95
VIS    2025250     20200   16.2700  146.0300       9.6        24       976        99
VIS    2025250     20200   16.2600  145.9500       8.6        37       967        95
VIS    2025250     20200   16.2600  145.9500       8.6        39       955        94
VIS    2025250     20200   16.2700  145.9100       9.1        34       811        97
VIS    2025250     20200   16.2600  145.8900       8.7        33       809        98
VIS    2025250     20200   16.2500  145.7400       8.0        14       796        91
VIS    2025250     20200   16.2400  140.8700      10.7       177       190        92
VIS    2025250     20200   16.2500  147.0900       9.0        41       992        95
VIS    2025250     20200   16.2600  147.0800       9.0        42       979        95
VIS    2025250     20200   16.2500  146.9700       8.2        43       977        95
VIS    2025250     20200   16.2400  146.7800       8.8        33       959        97
VIS    2025250     20200   16.2400  146.7600       8.7        30       934        95
VIS    2025250     20200   16.2400  146.7400       9.4        24       939        97
VIS    2025250     20200   16.2500  146.0800      10.5        28       954        97
VIS    2025250     20200   16.2400  146.0800      10.3        28       954        97
VIS    2025250     20200   16.2400  146.0400      10.2        27       837        92
VIS    2025250     20200   16.2500  145.9600       7.5        31       980        91
VIS    2025250     20200   16.2500  145.9400       7.7        49       955        91
VIS    2025250     20200   16.2300  145.8900       7.7        46       832        90
VIS    2025250     20200   16.2300  145.8600       9.4        23       825        94
VIS    2025250     20200   16.2300  145.8600      10.2        17       825        90
VIS    2025250     20200   16.2400  145.7700       8.0        26       816        90
VIS    2025250     20200   16.2500  145.7400       8.0        14       796        92
VIS    2025250     20200   16.2400  145.7000       9.5         7       789        91
VIS    2025250     20200   16.2200  142.1800       5.9       242       122        90
VIS    2025250     20200   16.2200  147.0000       8.7        35       988        98
VIS    2025250     20200   16.2100  146.8100       8.4        50       984        91
VIS    2025250     20200   16.2200  146.8000       9.0        40       959        97
VIS    2025250     20200   16.2300  146.7700       8.9        36       934        97
VIS    2025250     20200   16.2300  146.7600       8.6        33       934        97
VIS    2025250     20200   16.2300  146.7300       9.6        21       939        93
VIS    2025250     20200   16.2300  146.0400      10.1        28       832        93
VIS    2025250     20200   16.2300  145.8900       7.9        41       829        94
VIS    2025250     20200   16.2200  145.8600       9.3        23       825        93
VIS    2025250     20200   16.2100  145.7300       9.1        15       794        90
VIS    2025250     20200   16.2100  146.8100       8.3        53       984        90
VIS    2025250     20200   16.2000  146.8100       8.3        54       973        90
VIS    2025250     20200   16.1900  146.7700       8.2        50       916        97
VIS    2025250     20200   16.2000  146.7600       7.9        38       927        98
VIS    2025250     20200   16.1900  146.4200       9.4        37       952        98
VIS    2025250     20200   16.1900  146.4000       8.2        21       952        98
VIS    2025250     20200   16.1900  146.3800       8.1         6       952        94
VIS    2025250     20200   16.2000  145.8700       8.3        28       829        97
VIS    2025250     20200   16.1900  145.8000       8.9        16       825        90
VIS    2025250     20200   16.2000  145.7800       9.2        15       818        90
VIS    2025250     20200   16.1800  145.7700       9.0        15       820        92
VIS    2025250     20200   16.1600  146.7600       8.0        47       916        96
VIS    2025250     20200   16.1700  146.7500       8.0        41       910        96
VIS    2025250     20200   16.1800  146.4200       9.7        39       952        96
VIS    2025250     20200   16.1700  146.3800       8.9         7       940        94
VIS    2025250     20200   16.1600  145.9800       9.5        23       895        96
VIS    2025250     20200   16.1600  145.9600       9.4        18       972       100
VIS    2025250     20200   16.1600  145.9500       9.0        25       972        98
VIS    2025250     20200   16.1700  145.8900       8.4        35       861        94
VIS    2025250     20200   16.1600  145.8700       8.8        26       839        92
VIS    2025250     20200   16.1700  145.7700       8.8        15       821        92
VIS    2025250     20200   16.1700  145.7400       8.7        15       815        92
VIS    2025250     20200   16.1600  145.7400       8.6        15       815        92
VIS    2025250     20200   16.1600  145.6700       9.0         7       772        92
VIS    2025250     20200   16.1400  141.8800       5.1       183       114        94
VIS    2025250     20200   16.1500  147.3800       8.2        25       990        99
VIS    2025250     20200   16.1400  146.7700       8.1        43       928        95
VIS    2025250     20200   16.1400  146.7600       8.1        40       916        99
VIS    2025250     20200   16.1500  146.7300       8.4        32       908        92
VIS    2025250     20200   16.1400  146.5700       8.5        39       996        92
VIS    2025250     20200   16.1500  146.5600       8.8        41       990        94
VIS    2025250     20200   16.1400  146.4800       8.8        34       928        90
VIS    2025250     20200   16.1400  146.3800       8.4        19       921        97
VIS    2025250     20200   16.1400  146.3400       9.7        18       962        99
VIS    2025250     20200   16.1500  146.0000       9.4        29       945        96
VIS    2025250     20200   16.1500  145.9800       9.2        21       885        95
VIS    2025250     20200   16.1500  145.9400       8.7        28       972        96
VIS    2025250     20200   16.1400  145.9000       8.1        48       907        93
VIS    2025250     20200   16.1500  145.8700       9.0        28       841        93
VIS    2025250     20200   16.1400  145.7700       9.0        13       822        91
VIS    2025250     20200   16.1500  145.7600       8.7        15       821        93
VIS    2025250     20200   16.1300  145.7200       8.3        14       830        93
VIS    2025250     20200   16.1400  145.7200       8.2        10       815        92
VIS    2025250     20200   16.1500  145.6900       8.9         6       790        92
VIS    2025250     20200   16.1300  141.9700       5.0       179       115        96
VIS    2025250     20200   16.1100  141.9300       5.5       182       114        93
VIS    2025250     20200   16.1100  141.8900       6.3       190       114        92
VIS    2025250     20200   16.1300  140.9700      11.3       174       182        90
VIS    2025250     20200   16.1200  147.3600       9.5        35       980        96
VIS    2025250     20200   16.1200  147.3400       9.2        37       979        95
VIS    2025250     20200   16.1200  147.3300       9.2        35       979        91
VIS    2025250     20200   16.1300  147.3100       8.9        26       980        96
VIS    2025250     20200   16.1400  146.7500       8.3        37       915        95
VIS    2025250     20200   16.1200  146.7300       8.5        33       913        98
VIS    2025250     20200   16.1200  146.7100       8.0        33       908        90
VIS    2025250     20200   16.1300  146.5700       8.4        40       990        93
VIS    2025250     20200   16.1300  146.5500       8.3        46       957        94
VIS    2025250     20200   16.1100  146.5300       7.9        46       936        93
VIS    2025250     20200   16.1200  146.4900       8.0        39       936        92
VIS    2025250     20200   16.1200  146.3700       7.0        22       936        91
VIS    2025250     20200   16.1300  146.3300       9.2        21       962       100
VIS    2025250     20200   16.1300  146.3200       8.0        24       967        97
VIS    2025250     20200   16.1200  146.3000       7.6        20       984        95
VIS    2025250     20200   16.1100  146.0700       9.1        25       958        91
VIS    2025250     20200   16.1200  145.9000       8.1        56       900        91
VIS    2025250     20200   16.1200  145.8700       8.3        43       861        97
VIS    2025250     20200   16.1200  145.7400       8.3        18       815        90
VIS    2025250     20200   16.1300  145.7200       8.3        14       830        93
VIS    2025250     20200   16.1100  145.7100       8.5        12       830        91
VIS    2025250     20200   16.1000  141.8900       6.3       190       115        93
VIS    2025250     20200   16.0900  141.8800       4.2       205       117        97
VIS    2025250     20200   16.1100  147.3800       8.2        37       981        98
VIS    2025250     20200   16.1000  147.3800       8.0        47       981        95
VIS    2025250     20200   16.1200  147.3400       9.2        34       979        93
VIS    2025250     20200   16.1000  147.3300       8.9        35       946        98
VIS    2025250     20200   16.1000  146.7500       8.6        30       966        91
VIS    2025250     20200   16.1100  146.7300       8.6        32       915       100
VIS    2025250     20200   16.1100  146.7200       8.6        32       915       100
VIS    2025250     20200   16.1000  146.5400       8.0        48       931        93
VIS    2025250     20200   16.1100  146.5100       7.8        46       936        91
VIS    2025250     20200   16.1100  146.5000       7.7        44       943        90
VIS    2025250     20200   16.0900  146.3100       6.7        25       967        92
VIS    2025250     20200   16.0900  146.1200       7.7        18       961        95
VIS    2025250     20200   16.0900  146.1100       7.2        20       961        93
VIS    2025250     20200   16.0900  146.0800       7.4        22       958        96
VIS    2025250     20200   16.1100  146.0600       7.4        22       933        97
VIS    2025250     20200   16.0900  145.9500       7.8        36       830        98
VIS    2025250     20200   16.1000  145.9300       8.0        53       832        91
VIS    2025250     20200   16.0900  145.9100       8.2        56       839        93
VIS    2025250     20200   16.0900  145.7500       8.6        16       814        94
VIS    2025250     20200   16.1000  145.7200       8.7        15       811        91
VIS    2025250     20200   16.0900  145.7000       9.0        12       801        91
VIS    2025250     20200   16.0800  145.6600       8.6        11       785        92
VIS    2025250     20200   16.0800  147.7300       9.8        33       959        91
VIS    2025250     20200   16.0900  147.3600       8.6        47       981        92
VIS    2025250     20200   16.0800  147.3400       8.7        42       946        97
VIS    2025250     20200   16.0900  147.3100       9.0        30       946        98
VIS    2025250     20200   16.0800  147.2900       8.8        26       946        94
VIS    2025250     20200   16.0700  146.7900       8.0        37       970        94
VIS    2025250     20200   16.0900  146.7200       8.9        27       961       100
VIS    2025250     20200   16.0800  146.7000       7.6        40       913        92
VIS    2025250     20200   16.0700  146.6600       7.2        39       913        93
VIS    2025250     20200   16.0800  146.2800       8.5        20       977        99
VIS    2025250     20200   16.0600  146.2600       8.7        30       957        99
VIS    2025250     20200   16.0800  146.1200       7.6        17       955        95
VIS    2025250     20200   16.0800  146.0100       7.5        62       817        90
VIS    2025250     20200   16.0700  145.9800       8.1        40       817        98
VIS    2025250     20200   16.0700  145.9600       8.0        37       820        99
VIS    2025250     20200   16.0800  145.9300       7.8        53       830        96
VIS    2025250     20200   16.0800  145.9100       8.1        56       832        95
VIS    2025250     20200   16.0600  145.8100       8.8        27       832        96
VIS    2025250     20200   16.0600  145.8000       9.1        18       826        92
VIS    2025250     20200   16.0600  145.7400       8.4        17       820        93
VIS    2025250     20200   16.0600  145.7100       9.2        15       814        94
VIS    2025250     20200   16.0700  145.6900       9.4        11       799        92
VIS    2025250     20200   16.0600  145.6800       9.1        12       798        94
VIS    2025250     20200   16.0600  145.6400       7.9        10       783        95
VIS    2025250     20200   16.0500  147.7400       9.9        36       967        96
VIS    2025250     20200   16.0700  147.7300      10.0        34       954        92
VIS    2025250     20200   16.0600  147.4000       9.6        36       981        96
VIS    2025250     20200   16.0500  147.3300       8.3        40       937        99
VIS    2025250     20200   16.0700  147.2900       8.7        28       917        94
VIS    2025250     20200   16.0500  147.1800       9.3        27       982        99
VIS    2025250     20200   16.0500  147.1600       9.2        27       982        99
VIS    2025250     20200   16.0600  147.1400       8.2        27       982        95
VIS    2025250     20200   16.0600  146.7700       8.1        34       970        95
VIS    2025250     20200   16.0600  146.7600       8.1        32       933        98
VIS    2025250     20200   16.0400  146.7300       7.9        26       929        96
VIS    2025250     20200   16.0500  146.7000       7.4        33       932        95
VIS    2025250     20200   16.0600  146.6500       6.7        36       913        92
VIS    2025250     20200   16.0500  146.4600       8.2        39       944        94
VIS    2025250     20200   16.0600  146.4300       8.2        35       931        98
VIS    2025250     20200   16.0600  146.4100       8.6        30       931        99
VIS    2025250     20200   16.0500  146.4000       7.9        28       937        94
VIS    2025250     20200   16.0500  146.2400       7.9        33       957        95
VIS    2025250     20200   16.0500  146.2400       7.5        33       952        94
VIS    2025250     20200   16.0600  145.9800       7.9        44       816        98
VIS    2025250     20200   16.0500  145.9600       8.0        44       816        98
VIS    2025250     20200   16.0500  145.9400       8.6        26       817        97
VIS    2025250     20200   16.0400  145.8100       9.0        25       894        97
VIS    2025250     20200   16.0400  145.8000       9.0        21       837        93
VIS    2025250     20200   16.0500  145.7200       9.6        14       817        93
VIS    2025250     20200   16.0400  145.7100       9.8        12       817        92
VIS    2025250     20200   16.0500  145.6800       9.1        12       799        94
VIS    2025250     20200   16.0400  145.6400       8.4         9       792        91
VIS    2025250     20200   16.0500  145.6100       7.9         7       782        92
VIS    2025250     20200   16.0300  145.6000       9.0         8       787        91
VIS    2025250     20200   16.0400  149.0900       7.7        61       991        91
VIS    2025250     20200   16.0400  147.7400       9.6        34       967        98
VIS    2025250     20200   16.0300  147.7300       9.4        35       967        99
VIS    2025250     20200   16.0300  147.6900       8.9        35       935        96
VIS    2025250     20200   16.0300  147.3700       8.8        35       971        97
VIS    2025250     20200   16.0400  147.3400       8.5        41       963        94
VIS    2025250     20200   16.0400  147.3100       8.4        36       937       100
VIS    2025250     20200   16.0300  147.2200       8.8        28       963        97
VIS    2025250     20200   16.0400  147.1800       9.2        28       982        98
VIS    2025250     20200   16.0400  147.1700       8.7        27       933        96
VIS    2025250     20200   16.0200  147.1500       8.0        26       933        97
VIS    2025250     20200   16.0300  146.9800       6.5        51       918        93
VIS    2025250     20200   16.0400  146.7600       8.4        32       922       100
VIS    2025250     20200   16.0400  146.7300       7.9        31       929        93
VIS    2025250     20200   16.0200  146.7200       8.1        29       898        90
VIS    2025250     20200   16.0300  146.6500       7.7        33       913        99
VIS    2025250     20200   16.0300  146.6500       7.7        31       913        98
VIS    2025250     20200   16.0300  146.4900       8.5        36       956        91
VIS    2025250     20200   16.0200  146.4200       8.2        35       950        96
VIS    2025250     20200   16.0200  146.2000       6.9        23       849        93
VIS    2025250     20200   16.0200  145.9900       7.5        38       809        90
VIS    2025250     20200   16.0200  145.9600       8.0        38       811        95
VIS    2025250     20200   16.0300  145.9300       8.1        30       814        96
VIS    2025250     20200   16.0300  145.8100       8.9        29       894        99
VIS    2025250     20200   16.0300  145.8100       9.0        26       894        98
VIS    2025250     20200   16.0300  145.7700       9.0        18       837        90
VIS    2025250     20200   16.0200  145.7400       9.3        15       849        91
VIS    2025250     20200   16.0200  145.7300       9.6        13       854        90
VIS    2025250     20200   16.0300  145.7100       9.8        12       817        92
VIS    2025250     20200   16.0300  145.6700       9.5        12       797        92
VIS    2025250     20200   16.0300  145.5900       9.3         8       787        91
VIS    2025250     20200   16.0200  147.7500       9.0        31       967        96
VIS    2025250     20200   16.0200  147.7400       8.9        35       967        99
VIS    2025250     20200   16.0100  147.7000       8.7        33       959        97
VIS    2025250     20200   16.0200  147.6900       8.7        34       935        95
VIS    2025250     20200   16.0200  147.3600       8.7        32       959        97
VIS    2025250     20200   16.0200  147.3500       8.8        34       963        98
VIS    2025250     20200   16.0200  147.2500       8.9        32       926        95
VIS    2025250     20200   16.0100  147.2100       8.8        28       963       100
VIS    2025250     20200   16.0100  147.2000       8.7        25       963        99
VIS    2025250     20200   16.0100  147.1600       8.2        26       920        92
VIS    2025250     20200   16.0000  147.1500       8.1        22       916        93
VIS    2025250     20200   16.0000  147.1200       7.3        19       918        92
VIS    2025250     20200   16.0100  147.0000       7.4        35       915        99
VIS    2025250     20200   16.0100  146.9900       7.3        33       915        99
VIS    2025250     20200   16.0000  146.9500       8.9        15       915        93
VIS    2025250     20200   16.0100  146.7200       8.0        31       897        91
VIS    2025250     20200   16.0100  146.7000       7.9        34       897        97
VIS    2025250     20200   16.0100  146.4400       8.1        38       953        95
VIS    2025250     20200   15.9900  146.3500       8.9        31       963        96
VIS    2025250     20200   16.0000  146.2100       6.4        26       822        96
VIS    2025250     20200   16.0100  146.1900       6.8        22       822        93
VIS    2025250     20200   15.9900  146.1300       7.7        21       846        95
VIS    2025250     20200   16.0000  146.1000       7.6        22       846        93
VIS    2025250     20200   16.0100  146.0900       7.2        20       843        90
VIS    2025250     20200   16.0100  146.0300       9.1         9       814        90
VIS    2025250     20200   15.9900  146.0000       7.5        24       812        98
VIS    2025250     20200   16.0100  145.8000       8.9        28       894        98
VIS    2025250     20200   16.0100  145.7500       9.3        19       854        94
VIS    2025250     20200   16.0100  145.7300       9.6        16       856        93
VIS    2025250     20200   16.0000  145.7100       9.9        12       849        90
VIS    2025250     20200   15.9900  145.6200       8.1        15       794        94
VIS    2025250     20200   16.0100  145.5700       8.1         9       789        92
VIS    2025250     20200   16.0100  149.0600       7.8        57       991        92
VIS    2025250     20200   16.0000  147.7100       8.5        31       968        96
VIS    2025250     20200   16.0000  147.7000       8.6        30       964        96
VIS    2025250     20200   15.9900  147.6300       8.2        40       945        94
VIS    2025250     20200   15.9900  147.3400       9.0        33       984        99
VIS    2025250     20200   15.9800  147.3200       9.0        33       975        98
VIS    2025250     20200   15.9900  147.1700       8.6        21       916        94
VIS    2025250     20200   15.9900  147.1500       8.5        20       916        95
VIS    2025250     20200   15.9700  147.1400       8.8        18       915        94
VIS    2025250     20200   15.9700  147.1000       7.9        15       909        90
VIS    2025250     20200   15.9900  147.0200       8.2        27       944        99
VIS    2025250     20200   15.9800  147.0000       8.9        31       944       100
VIS    2025250     20200   15.9700  146.9700       8.8        25       908        96
VIS    2025250     20200   15.9900  146.9700       7.8        28       915        97
VIS    2025250     20200   15.9900  146.9500       8.7        16       914        93
VIS    2025250     20200   15.9700  146.8900       7.9        11       961        92
VIS    2025250     20200   15.9800  146.3500       9.5        28       972        98
VIS    2025250     20200   15.9900  146.3300       9.2        30       972        96
VIS    2025250     20200   15.9900  146.3000       8.4        28       947        94
VIS    2025250     20200   15.9700  146.2000       6.0        24       814        92
VIS    2025250     20200   15.9800  146.1700       6.3        22       816        96
VIS    2025250     20200   15.9700  146.1000       7.6        30       835        93
VIS    2025250     20200   15.9700  146.0700       7.3        25       841        93
VIS    2025250     20200   15.9800  145.6400       8.7        13       794        92
VIS    2025250     20200   15.9600  145.6200       7.9        14       796        96
VIS    2025250     20200   15.9400  142.3400       5.4       350       143        90
VIS    2025250     20200   15.9700  147.6800       7.8        28       964        91
VIS    2025250     20200   15.9700  147.6400       8.3        37       956        99
VIS    2025250     20200   15.9700  147.3400       9.7        33       992        92
VIS    2025250     20200   15.9700  147.1700       9.0        15       916        93
VIS    2025250     20200   15.9700  147.1400       8.9        18       915        94
VIS    2025250     20200   15.9500  147.1300       9.0        15       915        92
VIS    2025250     20200   15.9500  147.1100       8.4        17       906        90
VIS    2025250     20200   15.9700  146.9900       9.2        27       914        95
VIS    2025250     20200   15.9500  146.9600       8.5        21       900        91
VIS    2025250     20200   15.9500  146.6500       7.8        26       902        93
VIS    2025250     20200   15.9500  146.6100       6.8        23       911        92
VIS    2025250     20200   15.9600  146.5900       7.0        28       918        92
VIS    2025250     20200   15.9600  146.3100       7.2        29       951        96
VIS    2025250     20200   15.9500  146.3000       6.5        29       951        93
VIS    2025250     20200   15.9500  146.2000       7.7        17       808        92
VIS    2025250     20200   15.9600  145.9100       9.3        26       813        94
VIS    2025250     20200   15.9400  145.8800       8.8        22       815        94
VIS    2025250     20200   15.9500  145.8500       7.4        28       827        98
VIS    2025250     20200   15.9400  145.6800       8.7        15       832        93
VIS    2025250     20200   15.9400  145.6500       8.1        17       803        97
VIS    2025250     20200   15.9400  145.6100       7.9        12       803        95
VIS    2025250     20200   15.9600  145.6000       7.5        14       797        95
VIS    2025250     20200   15.9400  145.5800       7.3        12       830        90
VIS    2025250     20200   15.9600  145.5300       7.7         9       950        94
VIS    2025250     20200   15.9500  147.1500       9.1        10       936        93
VIS    2025250     20200   15.9400  147.1300       9.0        12       915        91
VIS    2025250     20200   15.9300  147.1100       8.7        16       904        90
VIS    2025250     20200   15.9300  146.6800       7.6        36       903        95
VIS    2025250     20200   15.9400  146.6400       7.4        30       904        90
VIS    2025250     20200   15.9300  146.5900       7.2        25       912        96
VIS    2025250     20200   15.9300  146.5700       7.9        26       913        99
VIS    2025250     20200   15.9300  146.5600       7.3        29       915        97
VIS    2025250     20200   15.9300  146.2100       9.2        20       818        91
VIS    2025250     20200   15.9200  146.1400       7.7        24       821        92
VIS    2025250     20200   15.9300  145.8700       7.8        22       824        95
VIS    2025250     20200   15.9300  145.6700       8.5        17       832        95
VIS    2025250     20200   15.9100  145.6600       7.7        18       855        97
VIS    2025250     20200   15.9200  145.6200       8.3        10       844        92
VIS    2025250     20200   15.9300  145.6100       8.1        11       809        94
VIS    2025250     20200   15.9300  145.5900       7.8        11       830        93
VIS    2025250     20200   15.9200  145.5600       8.9         9       852        91
VIS    2025250     20200   15.9200  145.5400       9.8         9       873        91
VIS    2025250     20200   15.9000  142.5600       7.7       354       156        90
VIS    2025250     20200   15.9200  149.1200       8.5        49       983        92
VIS    2025250     20200   15.9200  147.1300       9.1        13       936        95
VIS    2025250     20200   15.9000  147.1100       8.2        19       902        93
VIS    2025250     20200   15.9000  147.0800       8.4        18       901        90
VIS    2025250     20200   15.9200  146.9100       7.4        13       894        90
VIS    2025250     20200   15.9000  146.9000       6.6        17       894        92
VIS    2025250     20200   15.9000  146.8700       6.9        18       922        94
VIS    2025250     20200   15.9100  146.8500       6.9        28       957        90
VIS    2025250     20200   15.9000  146.8200       7.3        23       930        94
VIS    2025250     20200   15.9100  146.8100       7.2        27       923        95
VIS    2025250     20200   15.9200  146.5700       8.1        24       911        98
VIS    2025250     20200   15.9000  146.5500       6.9        25       911        95
VIS    2025250     20200   15.9100  146.2100       9.5        19       821        92
VIS    2025250     20200   15.9000  146.1600       8.7        19       821        90
VIS    2025250     20200   15.8900  146.1300       9.0        25       814        90
VIS    2025250     20200   15.8900  146.1000       9.7        26       820        94
VIS    2025250     20200   15.8900  146.0900       9.0        29       827        92
VIS    2025250     20200   15.9100  145.6800       7.8        20       855        97
VIS    2025250     20200   15.8900  145.6700       7.2        22       860        98
VIS    2025250     20200   15.9000  145.6500       7.4        17       844        96
VIS    2025250     20200   15.8900  145.6200       8.3        10       844        92
VIS    2025250     20200   15.9000  145.6000       8.1        10       830        93
VIS    2025250     20200   15.8900  145.5600       9.3        10       806        93
VIS    2025250     20200   15.9100  145.5400       9.8        10       873        93
VIS    2025250     20200   15.9000  144.9500       6.3        89       179        93
VIS    2025250     20200   15.8700  143.2700      11.0        17       193        90
VIS    2025250     20200   15.8700  141.0200      16.5       177       192        90
VIS    2025250     20200   15.9200  149.1200       8.5        49       983        92
VIS    2025250     20200   15.9100  149.0800       8.1        52       986        90
VIS    2025250     20200   15.9200  149.0500       8.0        55       999        90
VIS    2025250     20200   15.9000  147.1200       8.0        21       904        93
VIS    2025250     20200   15.9000  147.1100       7.9        22       902        94
VIS    2025250     20200   15.9000  146.9100       5.9        20       894        92
VIS    2025250     20200   15.8900  146.8700       6.6        20       923        95
VIS    2025250     20200   15.8800  146.8100       7.0        27       905        93
VIS    2025250     20200   15.8700  146.5700       7.3        28       906        91
VIS    2025250     20200   15.8700  146.5500       7.5        20       906        92
VIS    2025250     20200   15.8700  146.4100       9.3        28       984        95
VIS    2025250     20200   15.8700  146.3800       9.0        29       984        94
VIS    2025250     20200   15.8700  146.3400       8.7        35       977        94
VIS    2025250     20200   15.8900  146.1000       9.2        27       814        93
VIS    2025250     20200   15.8900  146.0900       8.7        29       826        95
VIS    2025250     20200   15.8800  145.6900       7.2        21       860        95
VIS    2025250     20200   15.8900  145.6700       7.1        21       860        98
VIS    2025250     20200   15.8800  145.6300       8.1        12       824        94
VIS    2025250     20200   15.8800  145.6200       8.5        10       824        93
VIS    2025250     20200   15.8800  145.6000       8.7         8       830        92
VIS    2025250     20200   15.8800  145.5600       9.2        10       806        93
VIS    2025250     20200   15.8600  145.5400       9.1        13       806        92
VIS    2025250     20200   15.8700  145.5000       9.2        18       920        90
VIS    2025250     20200   15.8800  144.9300       6.7       108       154        90
VIS    2025250     20200   15.8400  141.0200      16.5       177       192        90
VIS    2025250     20200   15.8400  141.0000      16.5       177       192        90
VIS    2025250     20200   15.8700  149.1500       8.9        47       981        94
VIS    2025250     20200   15.8700  149.0700       7.8        60       986        91
VIS    2025250     20200   15.8500  147.1300       7.5        28       978        98
VIS    2025250     20200   15.8700  146.8700       6.8        20       947        95
VIS    2025250     20200   15.8600  146.6400       7.2        36       936        91
VIS    2025250     20200   15.8500  146.6100       7.2        39       936        95
VIS    2025250     20200   15.8700  146.5500       7.2        22       906        93
VIS    2025250     20200   15.8600  146.5500       7.1        21       906        93
VIS    2025250     20200   15.8500  146.4200       9.1        29       984        99
VIS    2025250     20200   15.8400  146.0700       8.1        44       811        92
VIS    2025250     20200   15.8600  146.0300       7.4        23       823        96
VIS    2025250     20200   15.8500  145.6800       8.0        15       847        93
VIS    2025250     20200   15.8500  145.6500       7.7        15       830        95
VIS    2025250     20200   15.8400  145.6300       7.9        11       824        94
VIS    2025250     20200   15.8600  145.6000       9.4         8       839        90
VIS    2025250     20200   15.8600  145.5400       9.0        13       809        91
VIS    2025250     20200   15.8400  145.5100       9.3        12       834        91
VIS    2025250     20200   15.8400  145.4900      10.3        11       877        90
VIS    2025250     20200   15.8400  141.7500      18.3       238       165        95
VIS    2025250     20200   15.8700  149.1500       9.0        47       981        96
VIS    2025250     20200   15.8700  149.1400       9.0        48       981        94
VIS    2025250     20200   15.8700  149.0700       7.7        61       985        91
VIS    2025250     20200   15.8600  148.8900       8.6        52       985        97
VIS    2025250     20200   15.8500  147.1200       7.5        32       978        97
VIS    2025250     20200   15.8500  147.0900       7.1        32       948        92
VIS    2025250     20200   15.8300  147.0600       8.9        23       933        93
VIS    2025250     20200   15.8300  147.0500       8.8        21       909        90
VIS    2025250     20200   15.8300  147.0300       8.0        12       906        91
VIS    2025250     20200   15.8400  146.6600       7.3        24       921        96
VIS    2025250     20200   15.8300  146.6400       7.4        23       927        97
VIS    2025250     20200   15.8200  146.5000       7.5        10       917        91
VIS    2025250     20200   15.8400  146.4200       9.3        26       983        99
VIS    2025250     20200   15.8400  146.3700       8.2        29       972        94
VIS    2025250     20200   15.8300  146.3400       7.4        37       967        95
VIS    2025250     20200   15.8200  146.3000       7.8        39       948        90
VIS    2025250     20200   15.8400  146.1500       8.2        21       811        93
VIS    2025250     20200   15.8200  146.1400       8.3        22       811        90
VIS    2025250     20200   15.8400  146.0900      10.3        21       815        91
VIS    2025250     20200   15.8200  145.9700       8.4        17       828        90
VIS    2025250     20200   15.8400  145.6800       8.2        14       847        92
VIS    2025250     20200   15.8400  145.6400       7.8        12       830        94
VIS    2025250     20200   15.8400  145.6300       8.0        10       830        94
VIS    2025250     20200   15.8200  145.5900       8.9         7       859        91
VIS    2025250     20200   15.8200  145.5700       9.0         7       859        91
VIS    2025250     20200   15.8200  145.5300       8.7        11       842        92
VIS    2025250     20200   15.8400  145.5100       9.3        12       834        91
VIS    2025250     20200   15.8200  145.4900       9.1        12       844        92
VIS    2025250     20200   15.8400  149.1400       8.7        50       986        99
VIS    2025250     20200   15.8300  149.1100       8.3        52       977        93
VIS    2025250     20200   15.8300  148.9300       8.1        59       982        93
VIS    2025250     20200   15.8300  148.8800       9.3        47       985        97
VIS    2025250     20200   15.8100  147.1100       8.5        23       951        94
VIS    2025250     20200   15.8100  147.1100       8.6        24       951        93
VIS    2025250     20200   15.8100  147.0800       9.1        29       933        94
VIS    2025250     20200   15.8200  147.0400       8.3        19       909        93
VIS    2025250     20200   15.8200  147.0300       7.9        15       906        91
VIS    2025250     20200   15.8100  147.0000       7.3        18       901        92
VIS    2025250     20200   15.8200  146.9900       7.9        27       916        95
VIS    2025250     20200   15.8200  146.9600       7.9        40       918        92
VIS    2025250     20200   15.8200  146.6300       7.3        20       927        96
VIS    2025250     20200   15.8200  146.6300       7.1        23       946        96
VIS    2025250     20200   15.8200  146.5000       7.4        11       917        92
VIS    2025250     20200   15.8000  146.4800       6.7        15       946        92
VIS    2025250     20200   15.8200  146.4400       7.7        20       969        96
VIS    2025250     20200   15.8000  146.3000       7.9        30       931        98
VIS    2025250     20200   15.8000  146.2800       8.2        26       923        99
VIS    2025250     20200   15.8000  146.2300       9.3         7       891        90
VIS    2025250     20200   15.8100  146.1100       9.6        20       820        91
VIS    2025250     20200   15.8100  146.0900      10.1        18       823        90
VIS    2025250     20200   15.8200  146.0400       8.4        23       810        93
VIS    2025250     20200   15.8000  145.9600       8.2        18       837        91
VIS    2025250     20200   15.8000  145.9400       7.9        20       847        90
VIS    2025250     20200   15.8100  145.9200       8.1        18       850        92
VIS    2025250     20200   15.8100  145.6900       8.2        12       877        94
VIS    2025250     20200   15.8100  145.6800       8.1        13       877        95
VIS    2025250     20200   15.7900  145.6400       8.1         8       862        92
VIS    2025250     20200   15.8100  145.5900       8.2         8       889        94
VIS    2025250     20200   15.8000  145.5900       8.0         7       892        92
VIS    2025250     20200   15.8100  145.5600       8.7         6       859        91
VIS    2025250     20200   15.8100  145.5200       8.2        12       844        93
VIS    2025250     20200   15.8100  145.5100       8.5        13       842        93
VIS    2025250     20200   15.8000  145.4700       8.4        12       875        95
VIS    2025250     20200   15.8000  145.4700       8.4        11       877        94
VIS    2025250     20200   15.8100  149.1300       8.3        55       986        99
VIS    2025250     20200   15.8100  149.1200       8.3        54       983        93
VIS    2025250     20200   15.8000  148.9400       7.9        58       982        94
VIS    2025250     20200   15.8000  148.9100       7.9        58       982        97
VIS    2025250     20200   15.8100  148.8800       8.6        50       985        99
VIS    2025250     20200   15.8000  148.8700       8.3        53       985        97
VIS    2025250     20200   15.8000  148.4600       8.6        50       987        97
VIS    2025250     20200   15.7900  148.2900       9.5        39       987        98
VIS    2025250     20200   15.8000  147.1300       8.2        22       886        92
VIS    2025250     20200   15.8000  147.0800       8.8        22       907        92
VIS    2025250     20200   15.7800  147.0600       8.0        20       888        90
VIS    2025250     20200   15.7900  147.0400       6.8        22       889        92
VIS    2025250     20200   15.7900  146.9800       6.7        23       891        94
VIS    2025250     20200   15.8000  146.9500       6.4        39       892        90
VIS    2025250     20200   15.8000  146.6400       8.0        10       902        91
VIS    2025250     20200   15.7900  146.4600       7.0        13       969        90
VIS    2025250     20200   15.7800  146.4200       7.2        20       972        96
VIS    2025250     20200   15.7800  146.4200       7.0        20       972        95
VIS    2025250     20200   15.7900  146.2800       8.3        24       923        99
VIS    2025250     20200   15.7700  146.2600       7.9        16       920        94
VIS    2025250     20200   15.7700  146.0100       5.8        20       810        90
VIS    2025250     20200   15.7800  146.0000       6.3        18       819        91
VIS    2025250     20200   15.7900  145.9400       7.8        19       837        92
VIS    2025250     20200   15.7700  145.9100       7.7        21       844        94
VIS    2025250     20200   15.7900  145.6600       7.4         9       942        95
VIS    2025250     20200   15.7800  145.6400       8.1         8       863        93
VIS    2025250     20200   15.7800  145.5700       7.6         5       889        90
VIS    2025250     20200   15.7700  145.5300       7.3         9       844        91
VIS    2025250     20200   15.7800  145.5200       7.4        11       844        92
VIS    2025250     20200   15.7700  145.4800       7.4        14       870        93
VIS    2025250     20200   15.7800  145.4700       7.5        13       875        95
VIS    2025250     20200   15.7700  145.4400       8.4        12       920        96
VIS    2025250     20200   15.7900  148.9400       8.0        58       983        95
VIS    2025250     20200   15.7700  148.9000       8.2        53       975        99
VIS    2025250     20200   15.7700  148.8900       8.0        53       974        99
VIS    2025250     20200   15.7700  148.4500       9.5        47       987        91
VIS    2025250     20200   15.7700  148.4500       9.4        47       979        92
VIS    2025250     20200   15.7800  147.1400       6.8        22       794        90
VIS    2025250     20200   15.7800  147.0900       8.3        17       887        90
VIS    2025250     20200   15.7700  146.9700       6.9        18       886        91
VIS    2025250     20200   15.7600  146.9700       7.1        15       885        91
VIS    2025250     20200   15.7700  146.9000       5.6        16       908        90
VIS    2025250     20200   15.7700  146.6400       7.9         8       901        91
VIS    2025250     20200   15.7700  146.5600       8.3        31       954        91
VIS    2025250     20200   15.7700  146.5400       7.4        28       911        90
VIS    2025250     20200   15.7700  146.4200       7.1        20       972        96
VIS    2025250     20200   15.7700  146.4100       6.9        22       972        95
VIS    2025250     20200   15.7600  146.2700       7.6        16       915        95
VIS    2025250     20200   15.7700  146.2500       7.9        14       920        90
VIS    2025250     20200   15.7600  146.2400       7.3        17       935        91
VIS    2025250     20200   15.7600  146.1900       8.9        10       805        91
VIS    2025250     20200   15.7500  146.1700       8.9        13       805        92
VIS    2025250     20200   15.7500  146.1100       8.8        14       815        92
VIS    2025250     20200   15.7500  146.0900       7.2        33       832        98
VIS    2025250     20200   15.7500  146.0600       7.7        40       838        95
VIS    2025250     20200   15.7500  146.0400       7.5        35       837        98
VIS    2025250     20200   15.7700  146.0200       6.0        21       811        92
VIS    2025250     20200   15.7600  146.0000       5.6        24       834        90
VIS    2025250     20200   15.7500  145.9500       6.1        22       834        90
VIS    2025250     20200   15.7500  145.9300       7.3        20       834        95
VIS    2025250     20200   15.7700  145.9100       7.8        20       844        94
VIS    2025250     20200   15.7500  145.8800       8.7        19       956        94
VIS    2025250     20200   15.7500  145.6800       6.3        16       972        93
VIS    2025250     20200   15.7600  145.6600       7.3         8       943        95
VIS    2025250     20200   15.7400  145.4600       8.2        13       852        95
VIS    2025250     20200   15.7700  149.0700       7.8        58       972        91
VIS    2025250     20200   15.7600  148.9400       8.5        54       983        98
VIS    2025250     20200   15.7500  148.9100       8.1        57       974        96
VIS    2025250     20200   15.7700  148.9000       8.4        52       975       100
VIS    2025250     20200   15.7500  148.8700       8.6        48       974       100
VIS    2025250     20200   15.7500  148.6900       7.7        68       988        90
VIS    2025250     20200   15.7500  148.6800       7.7        66       980        91
VIS    2025250     20200   15.7500  148.6600       7.8        58       971        92
VIS    2025250     20200   15.7500  148.5300       9.0        54       959        93
VIS    2025250     20200   15.7500  148.5100       9.2        51       949        93
VIS    2025250     20200   15.7500  148.4800       9.3        48       949        90
VIS    2025250     20200   15.7500  148.4600       9.4        47       972        95
VIS    2025250     20200   15.7300  147.1400       7.2        41       820        90
VIS    2025250     20200   15.7500  146.3100       6.7        48       922        90
VIS    2025250     20200   15.7300  146.2500       6.1        18       915        92
VIS    2025250     20200   15.7300  146.1900       7.0        29       862        91
VIS    2025250     20200   15.7400  146.1700       8.7        16       835        92
VIS    2025250     20200   15.7400  146.1700       8.7        16       835        92
VIS    2025250     20200   15.7400  146.0900       7.8        22       832        96
VIS    2025250     20200   15.7400  146.0400       7.8        32       838        95
VIS    2025250     20200   15.7200  146.0000       8.3        25       843        93
VIS    2025250     20200   15.7200  145.9900       8.1        25       845        95
VIS    2025250     20200   15.7200  145.9400       6.9        22       871        92
VIS    2025250     20200   15.7200  145.9100       7.4        18       863        95
VIS    2025250     20200   15.7400  145.8700       8.4        25       956        94
VIS    2025250     20200   15.7200  145.8500       9.9         8       956        98
VIS    2025250     20200   15.7400  145.6600       7.0        19       964        90
VIS    2025250     20200   15.7200  143.1200       8.6       354       193        91
VIS    2025250     20200   15.7100  143.0900       8.5       350       194        91
VIS    2025250     20200   15.7200  142.7700       8.5       354       187        90
VIS    2025250     20200   15.7200  141.7100      11.9       230       170        93
VIS    2025250     20200   15.7000  141.6900      11.0       228       170        93
VIS    2025250     20200   15.7300  148.9400       7.9        66       984        94
VIS    2025250     20200   15.7300  148.9100       7.9        60       974        92
VIS    2025250     20200   15.7300  148.9000       8.0        57       973        95
VIS    2025250     20200   15.7400  148.8700       8.7        47       973        99
VIS    2025250     20200   15.7200  148.7100       7.8        71       990        90
VIS    2025250     20200   15.7400  148.6600       7.9        59       971        93
VIS    2025250     20200   15.7200  148.6200       7.8        60       976        94
VIS    2025250     20200   15.7200  148.6000       7.7        63       964        93
VIS    2025250     20200   15.7200  148.5800       8.1        60       955        94
VIS    2025250     20200   15.7200  148.5500       8.4        60       937        94
VIS    2025250     20200   15.7400  148.5200       8.9        56       949        95
VIS    2025250     20200   15.7200  148.4900       8.7        51       937        93
VIS    2025250     20200   15.7100  146.7600       7.2        34       799        91
VIS    2025250     20200   15.7000  146.3700       7.6        26       949        90
VIS    2025250     20200   15.7100  146.2900       7.1        27       829        93
VIS    2025250     20200   15.7100  146.2600       6.2        21       829        93
VIS    2025250     20200   15.7200  146.1800       7.4        26       842        91
VIS    2025250     20200   15.7100  146.1600       7.6        24       839        97
VIS    2025250     20200   15.7100  145.9700       8.1        23       871        97
VIS    2025250     20200   15.7200  145.9500       7.2        23       872        94
VIS    2025250     20200   15.7200  145.9400       7.1        23       871        92
VIS    2025250     20200   15.7200  145.9100       7.3        20       863        92
VIS    2025250     20200   15.7100  145.8500       9.5         9       891        90
VIS    2025250     20200   15.7100  145.8500       9.1         9       891        90
VIS    2025250     20200   15.6900  145.3600       8.2        15       863        97
VIS    2025250     20200   15.6900  145.3400      10.2        12       902        94
VIS    2025250     20200   15.6800  141.6700      11.6       227       170        95
VIS    2025250     20200   15.7100  149.0300       7.5        59       991        92
VIS    2025250     20200   15.7000  148.8700       7.7        57       972        94
VIS    2025250     20200   15.7200  148.6500       8.1        57       971        94
VIS    2025250     20200   15.7200  148.6400       8.1        56       971        94
VIS    2025250     20200   15.7200  148.6200       7.8        60       976        94
VIS    2025250     20200   15.7200  148.5800       8.0        62       955        94
VIS    2025250     20200   15.7000  148.5600       8.0        59       915        95
VIS    2025250     20200   15.7100  148.5400       8.3        60       918        94
VIS    2025250     20200   15.7100  148.4700       9.4        46       941        97
VIS    2025250     20200   15.7000  146.3800       7.1        25       959        90
VIS    2025250     20200   15.6900  146.3300       7.6        34       889        93
VIS    2025250     20200   15.7000  146.3000       7.4        32       835        91
VIS    2025250     20200   15.7000  146.2800       6.8        24       829        94
VIS    2025250     20200   15.6900  146.2400       6.5        19       882        94
VIS    2025250     20200   15.6800  146.2200       6.5        29       885        93
VIS    2025250     20200   15.7000  146.1400       7.9        16       841        92
VIS    2025250     20200   15.6900  146.1400       7.7        17       841        90
VIS    2025250     20200   15.7000  146.1100       8.7        11       837        90
VIS    2025250     20200   15.6800  146.0400       9.0        12       854        90
VIS    2025250     20200   15.6900  145.9900       8.6        20       872        96
VIS    2025250     20200   15.6800  145.9500       8.4        20       871        94
VIS    2025250     20200   15.6800  145.9400       7.6        21       875        97
VIS    2025250     20200   15.6800  145.9000       7.7        20       872        96
VIS    2025250     20200   15.6700  145.9000       7.9        20       875        95
VIS    2025250     20200   15.6900  145.8700       8.2        18       857        93
VIS    2025250     20200   15.6700  145.8400       7.5        15       857        95
VIS    2025250     20200   15.6700  145.7300       7.5       354       948        93
VIS    2025250     20200   15.6900  145.3300       9.3        16       902        91
VIS    2025250     20200   15.6600  142.5600      11.0       296       180        98
VIS    2025250     20200   15.6600  142.5500      11.0       298       180        99
VIS    2025250     20200   15.6700  142.4200       9.4       319       175        93
VIS    2025250     20200   15.7000  148.9400       8.0        68       989        92
VIS    2025250     20200   15.6900  148.9200       8.2        68       989        93
VIS    2025250     20200   15.7000  148.9000       7.8        62       973        93
VIS    2025250     20200   15.6900  148.8800       7.7        58       968        92
VIS    2025250     20200   15.6700  148.6600       7.9        68       985        92
VIS    2025250     20200   15.6900  148.5900       7.9        66       956        91
VIS    2025250     20200   15.6900  148.5800       8.0        65       938        92
VIS    2025250     20200   15.6900  148.5600       8.2        58       914        95
VIS    2025250     20200   15.6700  148.4900       8.4        41       947        97
VIS    2025250     20200   15.6600  146.5400       7.2        23       820        92
VIS    2025250     20200   15.6600  146.4000       6.4        24       976        92
VIS    2025250     20200   15.6700  146.3800       6.5        25       976        91
VIS    2025250     20200   15.6600  146.3200       7.7        33       851        91
VIS    2025250     20200   15.6500  146.3000       7.4        35       831        91
VIS    2025250     20200   15.6700  146.2400       6.6        15       838        93
VIS    2025250     20200   15.6700  146.2300       6.2        29       885        94
VIS    2025250     20200   15.6600  146.1800       6.1        32       906        92
VIS    2025250     20200   15.6600  146.1000       7.3        13       851        92
VIS    2025250     20200   15.6600  146.0400       8.7        10       854        91
VIS    2025250     20200   15.6600  146.0300       8.6        11       854        91
VIS    2025250     20200   15.6600  146.0100       8.7        12       872        92
VIS    2025250     20200   15.6600  145.9800       8.6        17       872        94
VIS    2025250     20200   15.6500  145.9400       8.6        15       869        92
VIS    2025250     20200   15.6700  145.9400       7.9        18       871        96
VIS    2025250     20200   15.6700  145.9000       8.0        20       875        95
VIS    2025250     20200   15.6700  145.8900       8.2        20       875        94
VIS    2025250     20200   15.6600  145.8500       6.9        17       853        97
VIS    2025250     20200   15.6600  145.8400       6.7        16       853        96
VIS    2025250     20200   15.6700  145.7300       7.6       356       948        94
VIS    2025250     20200   15.6500  145.3800       7.0        15       821        98
VIS    2025250     20200   15.6600  145.3600       7.3        16       863        98
VIS    2025250     20200   15.6500  145.3400       7.0        28       881        96
VIS    2025250     20200   15.6400  142.9100       7.5       342       189        90
VIS    2025250     20200   15.6500  142.5400      11.1       294       180        95
VIS    2025250     20200   15.6700  148.9100       7.8        65      1000        94
VIS    2025250     20200   15.6700  148.9000       7.8        67       989        91
VIS    2025250     20200   15.6600  148.8700       7.9        72       973        92
VIS    2025250     20200   15.6700  148.6500       7.8        61       986        94
VIS    2025250     20200   15.6600  148.6300       7.0        59       986        94
VIS    2025250     20200   15.6500  148.6200       7.6        60       966        94
VIS    2025250     20200   15.6600  148.5700       8.6        55       911        93
VIS    2025250     20200   15.6700  148.4800       8.1        43       948        97
VIS    2025250     20200   15.6400  147.0600       8.1        24       939        99
VIS    2025250     20200   15.6500  147.0600       8.0        24       925        99
VIS    2025250     20200   15.6500  146.5400       6.5        21       820        94
VIS    2025250     20200   15.6400  146.5200       5.9        19       826        90
VIS    2025250     20200   15.6500  146.4900       6.3        15       830        94
VIS    2025250     20200   15.6500  146.4700       5.9        13       848        94
VIS    2025250     20200   15.6400  146.4300       7.1        23       944        96
VIS    2025250     20200   15.6400  146.4200       7.5        25       950        97
VIS    2025250     20200   15.6500  146.4000       6.9        28       961        91
VIS    2025250     20200   15.6500  146.3500       7.2        35       929        90
VIS    2025250     20200   15.6500  146.3100       7.4        35       834        91
VIS    2025250     20200   15.6300  146.2400       5.7        22       841        95
VIS    2025250     20200   15.6400  146.2000       6.2        28       885        98
VIS    2025250     20200   15.6400  146.1700       7.0        19       882        98
VIS    2025250     20200   15.6400  146.1600       7.6        14       882        91
VIS    2025250     20200   15.6300  146.0600       7.7        12       863        91
VIS    2025250     20200   15.6500  146.0100       8.9        10       869        91
VIS    2025250     20200   15.6300  145.9800       8.7        13       869        92
VIS    2025250     20200   15.6300  145.9500       9.0        12       866        90
VIS    2025250     20200   15.6300  145.8700       6.8        20       859        95
VIS    2025250     20200   15.6400  145.8300       6.6        13       843        93
VIS    2025250     20200   15.6300  145.7800       7.1        15       847        93
VIS    2025250     20200   15.6300  145.7800       7.2        17       847        93
VIS    2025250     20200   15.6400  145.7500       7.4        10       847        91
VIS    2025250     20200   15.6300  145.6900       7.6         9       897        94
VIS    2025250     20200   15.6300  145.6800       8.2         9       953        92
VIS    2025250     20200   15.6400  145.3800       7.6        15       815        97
VIS    2025250     20200   15.6200  145.3500       7.4        20       847        99
VIS    2025250     20200   15.6300  142.8600       8.5       348       191        93
VIS    2025250     20200   15.6400  148.6000       8.4        61       937        92
VIS    2025250     20200   15.6200  148.5000       7.8        41       914        90
VIS    2025250     20200   15.6200  148.4900       7.6        44       934        91
VIS    2025250     20200   15.6300  147.0900       7.4        32       939        98
VIS    2025250     20200   15.6200  147.0700       8.2        22       957        99
VIS    2025250     20200   15.6300  147.0400       8.3        24       956        97
VIS    2025250     20200   15.6200  147.0200       8.2        23       922        93
VIS    2025250     20200   15.6100  146.4700       7.8        18       894        90
VIS    2025250     20200   15.6100  146.4300       8.3        19       929        99
VIS    2025250     20200   15.6100  146.3600       6.6        30       867        96
VIS    2025250     20200   15.6200  146.2400       5.9        21       841        91
VIS    2025250     20200   15.6100  146.2100       6.9        14       841        91
VIS    2025250     20200   15.6200  146.1800       7.5        13       844        93
VIS    2025250     20200   15.6100  145.9700       9.1        10       869        91
VIS    2025250     20200   15.6100  145.9500       9.0        11       869        91
VIS    2025250     20200   15.6100  145.9400       8.8        13       869        92
VIS    2025250     20200   15.6000  145.8400       6.9        14       840        90
VIS    2025250     20200   15.6200  145.8100       5.9        12       843        90
VIS    2025250     20200   15.6200  145.7800       7.2        15       847        93
VIS    2025250     20200   15.6200  145.7700       7.5        15       847        93
VIS    2025250     20200   15.6100  145.4000       7.6        14       800        97
VIS    2025250     20200   15.6100  145.3700       7.3        15       821        98
VIS    2025250     20200   15.6000  145.3700       7.8        12       800        98
VIS    2025250     20200   15.6000  145.3400       8.2        13       807        97
VIS    2025250     20200   15.6200  148.5400       9.1        46       907        92
VIS    2025250     20200   15.6100  148.5200       8.9        43       911        95
VIS    2025250     20200   15.5900  147.0600       7.9        16       934        91
VIS    2025250     20200   15.5900  147.0500       8.1        17       951        95
VIS    2025250     20200   15.6100  147.0100       9.3        16       946        91
VIS    2025250     20200   15.6100  146.8400       6.2        35       947        90
VIS    2025250     20200   15.5900  146.8300       6.8        36       947        90
VIS    2025250     20200   15.5800  146.6400       8.0        25       953        92
VIS    2025250     20200   15.5900  146.5300       7.4        23       871        93
VIS    2025250     20200   15.5900  146.5200       7.4        23       862        92
VIS    2025250     20200   15.5800  146.4800       7.8        32       871        91
VIS    2025250     20200   15.5900  146.4600       8.3        27       876        91
VIS    2025250     20200   15.5900  146.4300       8.1        17       876        92
VIS    2025250     20200   15.6000  146.4300       8.4        18       914        98
VIS    2025250     20200   15.6000  146.4000       7.6        23       926        90
VIS    2025250     20200   15.5900  146.0700       6.6        17       927        96
VIS    2025250     20200   15.5800  146.0500       7.4        14       899        95
VIS    2025250     20200   15.5800  145.9600       8.6         9       871        92
VIS    2025250     20200   15.5900  145.9300       8.9        14       890        94
VIS    2025250     20200   15.5800  145.9000       8.9        18       916        99
VIS    2025250     20200   15.5900  145.8600       7.5        20       851        91
VIS    2025250     20200   15.5900  145.8500       7.3        18       840        92
VIS    2025250     20200   15.6000  145.8100       6.5        11       843        93
VIS    2025250     20200   15.5800  145.8000       6.1        11       847        90
VIS    2025250     20200   15.6000  145.7700       7.3        14       847        95
VIS    2025250     20200   15.5900  145.7400       6.4        14       845        97
VIS    2025250     20200   15.5900  145.7100       7.3        13       826        92
VIS    2025250     20200   15.5800  145.6900       7.4        13       869        90
VIS    2025250     20200   15.5800  145.6200       7.0        13       904        98
VIS    2025250     20200   15.5900  145.5900       7.4        12       904        90
VIS    2025250     20200   15.5900  145.3800       7.7        12       797        97
VIS    2025250     20200   15.5900  145.3700       7.8        12       800        98
VIS    2025250     20200   15.5800  145.3500       8.4         9       800        96
VIS    2025250     20200   15.5700  145.3200       7.9         7       800        95
VIS    2025250     20200   15.5900  144.9000       9.4        91       168        92
VIS    2025250     20200   15.5800  142.0500      17.5       271       171        95
VIS    2025250     20200   15.6000  148.5500       9.4        54       937        92
VIS    2025250     20200   15.6000  148.5400       9.3        50       911        93
VIS    2025250     20200   15.5900  148.5000       8.9        41       913        95
VIS    2025250     20200   15.5800  148.5000       8.6        41       915        95
VIS    2025250     20200   15.5800  146.9900       8.7        18       946        98
VIS    2025250     20200   15.5800  146.9700       8.1        23       890        90
VIS    2025250     20200   15.5600  146.5500       7.1        38       913        93
VIS    2025250     20200   15.5700  146.5400       7.7        31       894        97
VIS    2025250     20200   15.5800  146.5200       7.4        24       871        94
VIS    2025250     20200   15.5800  146.5000       7.3        27       871        92
VIS    2025250     20200   15.5700  146.0700       7.1        18       927        97
VIS    2025250     20200   15.5600  146.0400       8.2        17       924        98
VIS    2025250     20200   15.5600  146.0200       8.5        11       880        93
VIS    2025250     20200   15.5600  146.0000       8.4         9       871        90
VIS    2025250     20200   15.5700  145.9600       8.4         9       871        92
VIS    2025250     20200   15.5700  145.9400       8.6        12       880        94
VIS    2025250     20200   15.5500  145.9200       8.5        13       893        95
VIS    2025250     20200   15.5700  145.8900       9.5        17       922        99
VIS    2025250     20200   15.5600  145.8700       9.4        18       924        90
VIS    2025250     20200   15.5600  145.8000       5.8        12       854        90
VIS    2025250     20200   15.5600  145.7800       6.0        12       854        95
VIS    2025250     20200   15.5700  145.7600       6.5        11       857        96
VIS    2025250     20200   15.5600  145.7200       7.4        10       857        97
VIS    2025250     20200   15.5700  145.7000       7.5        13       853        94
VIS    2025250     20200   15.5500  145.6800       7.9        13       871        92
VIS    2025250     20200   15.5600  145.6400       6.5        15       893        96
VIS    2025250     20200   15.5700  145.6200       7.1        13       893        98
VIS    2025250     20200   15.5600  145.6100       7.1        13       893        97
VIS    2025250     20200   15.5600  145.3700       7.3         8       807        92
VIS    2025250     20200   15.5600  145.3400       7.8         7       800        94
VIS    2025250     20200   15.5600  145.3300       7.7         6       800        92
VIS    2025250     20200   15.5600  144.9100       8.9       116       161        93
VIS    2025250     20200   15.5800  148.8700       8.5        62       969        91
VIS    2025250     20200   15.5700  148.5500       9.2        57       952        94
VIS    2025250     20200   15.5500  146.5500       7.0        41       876        91
VIS    2025250     20200   15.5500  146.5300       7.5        33       830        91
VIS    2025250     20200   15.5500  146.5000       6.8        29       825        93
VIS    2025250     20200   15.5300  146.1700       6.5        25       851        94
VIS    2025250     20200   15.5500  146.0500       7.8        22       949        96
VIS    2025250     20200   15.5500  146.0400       8.2        17       924        97
VIS    2025250     20200   15.5400  146.0200       8.5        13       924        95
VIS    2025250     20200   15.5400  146.0000       8.5        11       885        94
VIS    2025250     20200   15.5400  145.9700       7.7        14       871        94
VIS    2025250     20200   15.5500  145.9400       7.7        14       865        95
VIS    2025250     20200   15.5400  145.9200       8.2        15       890        96
VIS    2025250     20200   15.5300  145.8000       7.3        11       847        92
VIS    2025250     20200   15.5300  145.7600       7.1         9       848        93
VIS    2025250     20200   15.5500  145.7400       7.5         9       860        96
VIS    2025250     20200   15.5500  145.7100       7.6         9       863        95
VIS    2025250     20200   15.5300  145.6900       8.1        11       908        99
VIS    2025250     20200   15.5300  145.6700       8.7        11       871        94
VIS    2025250     20200   15.5300  145.6600       8.1        12       857        94
VIS    2025250     20200   15.5300  145.6400       7.0        13       843        92
VIS    2025250     20200   15.5300  145.6000       6.9         9       865        93
VIS    2025250     20200   15.5300  145.5900       7.2         7       897        90
VIS    2025250     20200   15.5300  145.4000       8.2         3       958        97
VIS    2025250     20200   15.5500  145.3800       7.2         5       824        90
VIS    2025250     20200   15.5400  145.3600       7.3         5       822        94
VIS    2025250     20200   15.5300  144.8600       5.9        70       171        92
VIS    2025250     20200   15.5100  146.4900       7.4        19       819        91
VIS    2025250     20200   15.5100  146.4800       7.1        19       819        92
VIS    2025250     20200   15.5200  146.3600       7.2        10       867        92
VIS    2025250     20200   15.5100  146.3300       7.0        14       938        92
VIS    2025250     20200   15.5200  146.1500       6.7        28       854        99
VIS    2025250     20200   15.5300  146.0100       8.6        14       924        96
VIS    2025250     20200   15.5100  146.0000       9.5        12       924        96
VIS    2025250     20200   15.5300  145.9700       7.9        14       885        94
VIS    2025250     20200   15.5100  145.9600       8.4        15       893        94
VIS    2025250     20200   15.5200  145.9400       7.7        16       890        96
VIS    2025250     20200   15.5200  145.8500      10.0        14       948        98
VIS    2025250     20200   15.5100  145.8200       9.7         9       874        90
VIS    2025250     20200   15.5200  145.7700       7.2         8       843        92
VIS    2025250     20200   15.5200  145.7100       7.6        10       932        97
VIS    2025250     20200   15.5200  145.6800       9.1        10       908        97
VIS    2025250     20200   15.5100  145.6500       8.2        10       895        96
VIS    2025250     20200   15.5100  145.6500       8.0        10       857        93
VIS    2025250     20200   15.5000  145.6300       6.8        11       853        93
VIS    2025250     20200   15.5100  145.6000       6.6        10       857        90
VIS    2025250     20200   15.5000  145.4000       8.2         7       958        97
VIS    2025250     20200   15.5000  145.3700       7.8       360       822        92
VIS    2025250     20200   15.5000  145.3600       7.8         0       822        92
VIS    2025250     20200   15.5000  144.8700       8.7       120       161        90
VIS    2025250     20200   15.5100  142.5500      18.2       290       189        90
VIS    2025250     20200   15.5000  142.4700      17.7       272       189        91
VIS    2025250     20200   15.5000  146.5700       5.4        29       800        91
VIS    2025250     20200   15.4900  146.5200       6.0        25       810        90
VIS    2025250     20200   15.5000  146.5000       7.2        22       814        91
VIS    2025250     20200   15.4900  146.4800       6.8        23       817        92
VIS    2025250     20200   15.4900  146.1300       5.7        27       867        95
VIS    2025250     20200   15.5000  146.0200       8.1        12       942        98
VIS    2025250     20200   15.5000  146.0000       9.5        12       930        95
VIS    2025250     20200   15.4800  145.8200      10.9         8       930        95
VIS    2025250     20200   15.4900  145.7300       6.6        15       890        97
VIS    2025250     20200   15.4800  145.7000       8.1         6       965        96
VIS    2025250     20200   15.4800  145.6800       8.8         6       959        98
VIS    2025250     20200   15.4900  145.6600       8.9         6       952        99
VIS    2025250     20200   15.5000  145.6500       8.2         9       895        98
VIS    2025250     20200   15.4900  145.6200       6.9        11       853        95
VIS    2025250     20200   15.4800  145.4100       7.8        10       940        98
VIS    2025250     20200   15.4900  145.3800       7.8         1       837        92
VIS    2025250     20200   15.5000  145.3600       7.8       360       837        92
VIS    2025250     20200   15.4800  142.5800      17.6       285       190        92
VIS    2025250     20200   15.4700  142.5800      17.8       286       190        90
VIS    2025250     20200   15.4800  148.5600       7.0        48       971        98
VIS    2025250     20200   15.4800  148.5400       7.2        43       964        97
VIS    2025250     20200   15.4700  147.0800       7.7        24       973        90
VIS    2025250     20200   15.4600  146.4600       4.8        29       814        94
VIS    2025250     20200   15.4600  146.4200       5.3        19       830        93
VIS    2025250     20200   15.4800  146.2200       8.4        22       973        95
VIS    2025250     20200   15.4700  146.1300       6.0        26       891        97
VIS    2025250     20200   15.4700  146.1200       6.2        27       936        93
VIS    2025250     20200   15.4800  146.0000       9.9         8       950        99
VIS    2025250     20200   15.4700  145.9900       9.8         8       936        98
VIS    2025250     20200   15.4600  145.9700       9.1        12       940        98
VIS    2025250     20200   15.4800  145.8600       8.9        20       948        99
VIS    2025250     20200   15.4800  145.8500       8.8        21       948        99
VIS    2025250     20200   15.4700  145.8100      10.1         9       950        99
VIS    2025250     20200   15.4700  145.7300       6.8        16       938        93
VIS    2025250     20200   15.4700  145.7000       8.5         5       965        97
VIS    2025250     20200   15.4700  145.6700       8.7         6       959        98
VIS    2025250     20200   15.4800  145.6500       8.7         8       952        99
VIS    2025250     20200   15.4800  145.6300       8.3        10       895        98
VIS    2025250     20200   15.4700  145.6100       8.1        11       879        98
VIS    2025250     20200   15.4600  145.5800       8.8         7       853        92
VIS    2025250     20200   15.4500  145.4100       7.5         3       940        93
VIS    2025250     20200   15.4600  144.8500       8.1       117       169        92
VIS    2025250     20200   15.4600  142.5100      17.0       284       191        93
VIS    2025250     20200   15.4800  148.5600       7.0        49       971        98
VIS    2025250     20200   15.4700  148.5400       7.5        42       964        98
VIS    2025250     20200   15.4400  147.1000       5.5        25       963        90
VIS    2025250     20200   15.4400  147.0900       5.7        25       963        93
VIS    2025250     20200   15.4500  147.0200       9.8        29       969        97
VIS    2025250     20200   15.4600  146.6100       7.1        48       898        94
VIS    2025250     20200   15.4500  146.4800       4.9        32       810        92
VIS    2025250     20200   15.4500  146.4300       5.3        22       820        91
VIS    2025250     20200   15.4500  146.4200       5.6        18       830        94
VIS    2025250     20200   15.4400  146.2800       7.2        15       919        97
VIS    2025250     20200   15.4600  146.2600       7.5        16       962        90
VIS    2025250     20200   15.4500  145.8500       8.9        14       971        98
VIS    2025250     20200   15.4300  145.7700       8.0        14       950        98
VIS    2025250     20200   15.4300  145.7700       8.0        14       950        98
VIS    2025250     20200   15.4300  145.7300       8.1        11       959        97
VIS    2025250     20200   15.4300  145.7200       8.0        10       959        97
VIS    2025250     20200   15.4500  145.6900       8.4         6       965        98
VIS    2025250     20200   15.4500  145.6700       8.5         8       959        99
VIS    2025250     20200   15.4500  145.5800       9.2         7       857        91
VIS    2025250     20200   15.4500  145.5800       9.4         6       857        91
VIS    2025250     20200   15.4300  145.5500       8.2         9       850        92
VIS    2025250     20200   15.4500  145.4100       7.3         2       940        92
VIS    2025250     20200   15.4300  145.3800       6.9       357       940        90
VIS    2025250     20200   15.4500  144.8500       8.6       116       169        90
VIS    2025250     20200   15.4200  142.3300      11.8       275       189        98
VIS    2025250     20200   15.4500  148.5600       7.2        45       971        99
VIS    2025250     20200   15.4300  147.1100       5.3        19       960        90
VIS    2025250     20200   15.4300  147.1000       5.6        21       960        92
VIS    2025250     20200   15.4400  147.0100       9.3        29       969        99
VIS    2025250     20200   15.4200  146.6200       8.6        20       947        92
VIS    2025250     20200   15.4200  146.5900       8.3        25       925        98
VIS    2025250     20200   15.4100  146.2900       5.5        22       908        95
VIS    2025250     20200   15.4100  146.2600       6.4        13       916        95
VIS    2025250     20200   15.4300  145.9500       8.1        15       968        96
VIS    2025250     20200   15.4100  145.8400       8.8        10       971        98
VIS    2025250     20200   15.4300  145.7300       8.2        11       959        95
VIS    2025250     20200   15.4100  145.6900       7.5        13       965        95
VIS    2025250     20200   15.4100  145.6800       7.8        11       965        97
VIS    2025250     20200   15.4300  145.6000      10.0         6       962        96
VIS    2025250     20200   15.4300  145.5700       9.9         6       871        90
VIS    2025250     20200   15.4100  145.5500       9.0         8       871        93
VIS    2025250     20200   15.4100  145.5400       8.3         7       871        95
VIS    2025250     20200   15.4100  145.4700       7.0         8       844        91
VIS    2025250     20200   15.4100  145.3500       7.3         2       940        94
VIS    2025250     20200   15.4100  145.3200       7.8         2       942        98
VIS    2025250     20200   15.4100  145.3000       7.8         3       933        97
VIS    2025250     20200   15.4100  142.5000      17.1       276       188        90
VIS    2025250     20200   15.4000  142.3500       8.6       291       188        93
VIS    2025250     20200   15.4000  147.1300       5.9        17       844        90
VIS    2025250     20200   15.4100  147.1000       5.5        16       916        94
VIS    2025250     20200   15.4100  146.6300       8.9        22       956        91
VIS    2025250     20200   15.4100  146.6200       8.8        21       953        93
VIS    2025250     20200   15.3900  146.5800       8.2        20       937        94
VIS    2025250     20200   15.4100  146.5800       8.3        23       925        98
VIS    2025250     20200   15.3900  146.5000       7.1        35       834        90
VIS    2025250     20200   15.3900  146.4200       4.4        16       830        91
VIS    2025250     20200   15.4100  146.2800       5.7        23       908        92
VIS    2025250     20200   15.4000  146.2400       5.9        15       933        92
VIS    2025250     20200   15.3900  146.1700       9.0        14       932        99
VIS    2025250     20200   15.3900  146.1600       9.0        12       932        99
VIS    2025250     20200   15.4100  146.1400       7.6        18       932        91
VIS    2025250     20200   15.4000  145.8300       8.3        12       967        98
VIS    2025250     20200   15.3900  145.7700       7.7        15       941        96
VIS    2025250     20200   15.3900  145.7400       8.2        12       959        98
VIS    2025250     20200   15.3900  145.7100       7.7        12       959        96
VIS    2025250     20200   15.4000  145.5400       8.9         7       871        94
VIS    2025250     20200   15.4000  145.5300       8.9         7       871        94
VIS    2025250     20200   15.3800  145.5000       8.6         8       843        91
VIS    2025250     20200   15.3800  145.4900       8.0         8       823        91
VIS    2025250     20200   15.3900  145.3900       6.0         5       916        91
VIS    2025250     20200   15.3800  145.3600       6.7         3       938        95
VIS    2025250     20200   15.3900  145.3200       8.0         4       936        98
VIS    2025250     20200   15.3700  142.5900       8.6       273       190        93
VIS    2025250     20200   15.3800  141.9800      19.1       246       193        92
VIS    2025250     20200   15.4000  148.5300       7.2        43       965        91
VIS    2025250     20200   15.3800  146.6100       8.4        26       949        96
VIS    2025250     20200   15.3900  146.5900       8.1        20       939        96
VIS    2025250     20200   15.3900  146.5300       8.5        24       917        95
VIS    2025250     20200   15.3700  146.5100       8.5        24       917        99
VIS    2025250     20200   15.3700  146.5000       7.8        30       907       100
VIS    2025250     20200   15.3800  146.1600       8.0        13       927        97
VIS    2025250     20200   15.3700  146.1400       7.6        13       922        90
VIS    2025250     20200   15.3800  145.5700       9.0         6       974        94
VIS    2025250     20200   15.3800  145.5400       9.9         6       963        99
VIS    2025250     20200   15.3800  145.5200       9.5         6       921        99
VIS    2025250     20200   15.3700  145.4900       8.9         7       831        91
VIS    2025250     20200   15.3800  145.4900       8.2         7       826        91
VIS    2025250     20200   15.3800  145.3900       5.9         8       873        95
VIS    2025250     20200   15.3700  145.3800       6.1         7       916        95
VIS    2025250     20200   15.3800  145.3500       7.0         3       938        96
VIS    2025250     20200   15.3800  145.3200       8.0         5       936        98
VIS    2025250     20200   15.3500  142.6000       8.6       281       193        91
VIS    2025250     20200   15.3500  142.5800       8.9       283       193        92
VIS    2025250     20200   15.3600  148.4700       6.0        35       975        92
VIS    2025250     20200   15.3500  147.5100       8.0        34       978        91
VIS    2025250     20200   15.3400  146.6300       8.0        15       961        96
VIS    2025250     20200   15.3400  146.5400       8.2        15       923        97
VIS    2025250     20200   15.3600  146.5200       8.4        24       936        99
VIS    2025250     20200   15.3600  146.4900       7.4        36       885        98
VIS    2025250     20200   15.3400  146.4500       7.2        30       871        90
VIS    2025250     20200   15.3500  146.1000       6.2        22       924        90
VIS    2025250     20200   15.3500  146.0800       7.0        20       915        97
VIS    2025250     20200   15.3500  145.5400       9.5         5       971       100
VIS    2025250     20200   15.3500  145.4900       9.3         7       867        92
VIS    2025250     20200   15.3400  145.4800       9.2         7       867        93
VIS    2025250     20200   15.3300  145.4600       8.3         6       838        93
VIS    2025250     20200   15.3300  145.4400       7.1         7       838        94
VIS    2025250     20200   15.3300  145.4100       6.6         8       875        94
VIS    2025250     20200   15.3300  145.3700       6.3         7       919        90
VIS    2025250     20200   15.3500  145.3500       7.1         4       950        95
VIS    2025250     20200   15.3400  145.3300       7.6         5       959        95
VIS    2025250     20200   15.3500  148.4700       6.0        33       974        92
VIS    2025250     20200   15.3300  147.4600       8.3        31       972        98
VIS    2025250     20200   15.3300  147.4600       8.0        31       965        99
VIS    2025250     20200   15.3300  147.2000       4.9        28       794        93
VIS    2025250     20200   15.3300  146.6600       8.4        14       961        98
VIS    2025250     20200   15.3400  146.4600       7.7        28       871        92
VIS    2025250     20200   15.3300  146.4300       7.7        21       940        90
VIS    2025250     20200   15.3200  146.0900       5.7        21       921        92
VIS    2025250     20200   15.3200  146.0700       6.2        21       906        94
VIS    2025250     20200   15.3200  146.0600       6.2        24       903        94
VIS    2025250     20200   15.3300  145.5100       9.6         6       963        99
VIS    2025250     20200   15.3300  145.4800       9.2         7       867        92
VIS    2025250     20200   15.3300  145.4700       9.0         7       846        91
VIS    2025250     20200   15.3300  145.4400       7.4         7       838        95
VIS    2025250     20200   15.3100  145.4200       7.1         7       865        94
VIS    2025250     20200   15.3300  145.3200       8.2         7       955        95
VIS    2025250     20200   15.3100  142.0900      16.3       268       190        91
VIS    2025250     20200   15.3100  147.5600       6.2        30       973        93
VIS    2025250     20200   15.3000  147.5300       6.0        31       955        94
VIS    2025250     20200   15.3200  147.5300       5.4        34       959        91
VIS    2025250     20200   15.3100  147.5000       6.0        30       955        94
VIS    2025250     20200   15.3200  147.4600       8.0        30       965        98
VIS    2025250     20200   15.3200  147.4500       7.4        30       959        98
VIS    2025250     20200   15.3100  147.3000       6.4        52       782        90
VIS    2025250     20200   15.3200  147.2300       5.9        41       785        92
VIS    2025250     20200   15.3100  147.2000       5.1        25       795        93
VIS    2025250     20200   15.3100  146.4600       8.8        17       911        96
VIS    2025250     20200   15.3100  146.4500       8.6        20       935        97
VIS    2025250     20200   15.2900  146.2100       4.1        25       860        91
VIS    2025250     20200   15.3100  146.0800       6.1        20       912        92
VIS    2025250     20200   15.3100  146.0600       6.2        24       903        94
VIS    2025250     20200   15.2900  146.0500       5.5        25       942        90
VIS    2025250     20200   15.3000  145.5200       9.2         5       969        92
VIS    2025250     20200   15.3000  145.4900       9.0         6       963        95
VIS    2025250     20200   15.2900  145.4600       8.4         7       846        93
VIS    2025250     20200   15.3000  145.4400       7.6         7       838        94
VIS    2025250     20200   15.2900  145.4200       7.4         6       846        92
VIS    2025250     20200   15.3000  145.3900       7.0         6       925        93
VIS    2025250     20200   15.2900  145.3600       7.4         7       941        95
VIS    2025250     20200   15.2800  144.5300       6.1        75       190        98
VIS    2025250     20200   15.3000  147.5300       6.2        31       955        91
VIS    2025250     20200   15.3000  147.5000       6.2        31       938        93
VIS    2025250     20200   15.2800  147.2400       5.2        28       780        90
VIS    2025250     20200   15.2800  147.2100       5.2        17       788        91
VIS    2025250     20200   15.2800  146.4400       8.3        16       941        95
VIS    2025250     20200   15.2800  146.3400       4.1        24       798        93
VIS    2025250     20200   15.2900  146.1900       4.8        21       925        91
VIS    2025250     20200   15.2700  146.0800       4.9        21       872        91
VIS    2025250     20200   15.2900  146.0600       5.3        22       906        93
VIS    2025250     20200   15.2700  145.5000       8.5         4       976        91
VIS    2025250     20200   15.2700  145.4900       8.7         5       969        92
VIS    2025250     20200   15.2700  145.4600       8.5         7       908        98
VIS    2025250     20200   15.2700  145.4500       7.8         7       861        94
VIS    2025250     20200   15.2600  145.4200       7.1         9       861        93
VIS    2025250     20200   15.2600  145.3900       7.6         9       935        97
VIS    2025250     20200   15.2600  145.3700       8.1         7       948        97
VIS    2025250     20200   15.2600  145.3500       8.0         5       941        97
VIS    2025250     20200   15.2600  147.6000       5.9        31       951        93
VIS    2025250     20200   15.2500  147.0700       5.7        24       789        91
VIS    2025250     20200   15.2600  147.0500       5.8        23       796        90
VIS    2025250     20200   15.2700  146.4300       8.6        14       945        90
VIS    2025250     20200   15.2600  146.3500       5.1        14       792        90
VIS    2025250     20200   15.2500  146.3100       4.0        19       812        98
VIS    2025250     20200   15.2500  146.3000       4.5        19       849        98
VIS    2025250     20200   15.2600  145.4600       8.6         7       908        98
VIS    2025250     20200   15.2400  145.4400       8.6         6       957        98
VIS    2025250     20200   15.2500  145.4200       7.3        10       886        96
VIS    2025250     20200   15.2600  145.3900       7.7         9       935        97
VIS    2025250     20200   15.2400  144.5300       7.6        99       190        94
VIS    2025250     20200   15.2500  144.5100       7.6        93       190        90
VIS    2025250     20200   15.2400  144.4800       5.7        85       190        94
VIS    2025250     20200   15.2300  144.4700       5.1        80       190        95
VIS    2025250     20200   15.2300  147.3900       4.1        42       800        95
VIS    2025250     20200   15.2500  147.0700       5.6        24       789        92
VIS    2025250     20200   15.2500  147.0500       5.9        22       800        93
VIS    2025250     20200   15.2400  147.0300       5.5        18       805        91
VIS    2025250     20200   15.2300  147.0000       4.7        17       805        91
VIS    2025250     20200   15.2400  146.9800       4.2        24       805        92
VIS    2025250     20200   15.2400  146.3100       4.5        18       849        98
VIS    2025250     20200   15.2300  146.0000       5.5         9       854        94
VIS    2025250     20200   15.2200  145.9700       5.0        10       937        90
VIS    2025250     20200   15.2300  145.4400       8.7         6       957        99
VIS    2025250     20200   15.2300  145.4300       8.1         7       935        98
VIS    2025250     20200   15.2200  144.5000       7.5        92       183        95
VIS    2025250     20200   15.2300  144.4700       5.4        82       183        94
VIS    2025250     20200   15.2300  144.4600       4.4        75       188        92
VIS    2025250     20200   15.2300  147.6200       7.5        35       974        95
VIS    2025250     20200   15.2300  147.5400       6.0        33       901        94
VIS    2025250     20200   15.2300  147.5100       7.2        31       901        95
VIS    2025250     20200   15.2100  147.4200       4.8        41       802        96
VIS    2025250     20200   15.2100  147.0300       5.3        19       784        91
VIS    2025250     20200   15.2200  147.0100       5.1        14       805        92
VIS    2025250     20200   15.2100  146.9500       5.1        17       801        91
VIS    2025250     20200   15.2000  146.9400       5.1        20       801        91
VIS    2025250     20200   15.2000  146.0100       5.9         4       829        94
VIS    2025250     20200   15.2000  146.0000       5.6         3       829        95
VIS    2025250     20200   15.2100  145.9800       4.9         7       897        93
VIS    2025250     20200   15.2100  145.4300       9.4         5       897        93
VIS    2025250     20200   15.1800  147.5200       4.2        43       847        92
VIS    2025250     20200   15.2000  147.4200       4.7        40       802        95
VIS    2025250     20200   15.2000  147.0200       5.2        18       786        92
VIS    2025250     20200   15.1900  146.0300       6.8        11       822        90
VIS    2025250     20200   15.1900  146.0300       6.8         9       819        90
VIS    2025250     20200   15.1800  146.0000       4.6         4       816        92
VIS    2025250     20200   15.1800  145.8900       5.2        14       873        97
VIS    2025250     20200   15.1800  145.8800       5.3        12       873        96
VIS    2025250     20200   15.1700  145.5300       7.0        16       970        91
VIS    2025250     20200   15.1700  145.5200       6.9        16       970        90
VIS    2025250     20200   15.1900  145.5000       6.9         6       970        93
VIS    2025250     20200   15.1700  147.5200       4.6        47       838        90
VIS    2025250     20200   15.1700  147.5100       4.2        52       847        97
VIS    2025250     20200   15.1600  147.0100       5.4        19       786        91
VIS    2025250     20200   15.1700  146.4800       7.0        20       973        96
VIS    2025250     20200   15.1500  146.4600       7.2        17       962        93
VIS    2025250     20200   15.1400  144.4500       6.4        88       169        93
VIS    2025250     20200   15.1400  147.7700       7.1        35       970        91
VIS    2025250     20200   15.1100  144.4500       5.9        87       169        90
VIS    2025250     20200   15.1100  147.6900       5.6        24       922        90
VIS    2025250     20200   15.1000  146.0500       7.2        13       885        93
VIS    2025250     20200   15.1000  145.8600       5.4        22       942        91
VIS    2025250     20200   15.1000  145.8500       5.8        20       942        92
VIS    2025250     20200   15.0900  145.4300       6.9        12       812        92
VIS    2025250     20200   15.1000  147.7400       6.5        27       939        90
VIS    2025250     20200   15.0900  147.7200       6.2        29       910        98
VIS    2025250     20200   15.1000  147.6900       5.3        31       910        90
VIS    2025250     20200   15.0900  147.6200       6.3        36       813        90
VIS    2025250     20200   15.1000  147.5200       6.7        34       811        90
VIS    2025250     20200   15.0900  147.1900       4.0        30       775        96
VIS    2025250     20200   15.0800  146.0400       7.1        12       885        97
VIS    2025250     20200   15.0700  146.0200       6.4        12       878        95
VIS    2025250     20200   15.0700  145.8800       6.2        12       965        92
VIS    2025250     20200   15.0700  145.8600       7.3        11       883        98
VIS    2025250     20200   15.0700  145.8100       7.5         9       883        95
VIS    2025250     20200   15.0800  145.8100       7.4        10       883        95
VIS    2025250     20200   15.0900  145.4300       7.0        11       812        92
VIS    2025250     20200   15.0800  145.4100       7.4        10       823        92
VIS    2025250     20200   15.0600  147.6500       7.1        37       860        91
VIS    2025250     20200   15.0800  147.5200       5.7        46       832        91
VIS    2025250     20200   15.0700  147.2000       4.6        32       775        95
VIS    2025250     20200   15.0700  147.1700       4.4        35       777        96
VIS    2025250     20200   15.0700  146.0600       7.2        12       895        98
VIS    2025250     20200   15.0500  146.0400       5.7        16       902        96
VIS    2025250     20200   15.0700  146.0200       5.9        14       878        95
VIS    2025250     20200   15.0700  145.9000       5.0        16       971        90
VIS    2025250     20200   15.0700  145.8800       6.5        11       969        93
VIS    2025250     20200   15.0600  145.8600       8.0         7       883        95
VIS    2025250     20200   15.0500  145.8200       8.1         5       877        93
VIS    2025250     20200   15.0600  145.7900       7.7         9       883        95
VIS    2025250     20200   15.0600  145.7800       7.8         9       857        91
VIS    2025250     20200   15.0400  147.9300       5.5        32       908        92
VIS    2025250     20200   15.0600  147.6500       7.2        36       857        90
VIS    2025250     20200   15.0500  146.4900       8.1        12       958        98
VIS    2025250     20200   15.0500  146.0300       5.1        17       902        93
VIS    2025250     20200   15.0400  145.8600       7.6         3       971        95
VIS    2025250     20200   15.0400  145.8400       8.6         3       877        91
VIS    2025250     20200   15.0400  145.8300       8.3         2       912        94
VIS    2025250     20200   15.0300  145.8000       8.4         5       912        96
VIS    2025250     20200   15.0300  145.7800       8.4         5       898        94
VIS    2025250     20200   15.0300  145.7400       6.6        13       861        91
VIS    2025250     20200   15.0300  149.6200       9.5        55       986        90
VIS    2025250     20200   15.0200  147.9800       4.3        43       908        90
VIS    2025250     20200   15.0200  147.7500       4.2        29       812        90
VIS    2025250     20200   15.0000  145.8800       7.2         3       927        90
VIS    2025250     20200   15.0000  145.8600       7.5         1       959        91
VIS    2025250     20200   15.0200  145.8300       8.2         1       959        96
VIS    2025250     20200   15.0200  145.8200       8.6         2       948        95
VIS    2025250     20200   15.0100  145.6500       6.6         8       797        92
VIS    2025250     20200   15.0000  144.3500       7.4        97       180        93
VIS    2025250     20200   14.9900  147.8300       4.5        22       804        96
VIS    2025250     20200   15.0000  147.8000       4.2        35       804        90
VIS    2025250     20200   15.0000  147.0600       4.0        21       805        94
VIS    2025250     20200   15.0000  145.8800       7.3         3       927        90
VIS    2025250     20200   14.9800  145.8500       7.1         5       927        90
VIS    2025250     20200   14.9900  145.8200       7.0         5       973        94
VIS    2025250     20200   15.0000  145.7800       7.9         5       948        95
VIS    2025250     20200   15.0000  145.7600       8.1         4       905        95
VIS    2025250     20200   14.9900  145.7400       8.2         2       905        94
VIS    2025250     20200   14.9800  145.7200       8.0         3       920       100
VIS    2025250     20200   14.9800  145.6800       6.8        11       825        96
VIS    2025250     20200   14.9800  145.6800       6.8        11       825        96
VIS    2025250     20200   14.9800  144.3300       8.4        94       179        90
VIS    2025250     20200   14.9700  144.3100       7.6        86       171        95
VIS    2025250     20200   14.9800  147.8500       4.6        16       804        93
VIS    2025250     20200   14.9900  147.8200       5.0        22       804        98
VIS    2025250     20200   14.9700  147.0100       4.3        27       811        92
VIS    2025250     20200   14.9700  145.9900       5.1        12       966        90
VIS    2025250     20200   14.9500  145.8900       5.4         9       866        90
VIS    2025250     20200   14.9500  145.8800       6.2         8       839        93
VIS    2025250     20200   14.9700  145.8400       6.7         8       905        95
VIS    2025250     20200   14.9700  145.7200       8.0         2       920        99
VIS    2025250     20200   14.9700  145.7100       7.9         4       920        99
VIS    2025250     20200   14.9600  145.6800       7.2        10       839        97
VIS    2025250     20200   14.9500  145.6600       7.2        10       825        94
VIS    2025250     20200   14.9600  145.5900       6.6         5       855        94
VIS    2025250     20200   14.9500  147.8600       4.1        23       802        91
VIS    2025250     20200   14.9400  147.7300       4.3        28       800        99
VIS    2025250     20200   14.9500  145.8700       6.4         7       839        94
VIS    2025250     20200   14.9300  145.7100       8.9         5       963        99
VIS    2025250     20200   14.9500  145.6800       8.1         7       912        99
VIS    2025250     20200   14.9400  145.6600       8.2         7       852        93
VIS    2025250     20200   14.9300  145.6400       7.5         7       802        95
VIS    2025250     20200   14.9500  145.6100       5.9         8       814        96
VIS    2025250     20200   14.9400  145.5800       6.2         6       855        98
VIS    2025250     20200   14.9300  145.5800       6.2         6       855        98
VIS    2025250     20200   14.9300  145.4800       7.2         8       871        98
VIS    2025250     20200   14.9500  145.4500       6.4        14       827        97
VIS    2025250     20200   14.9400  145.4300       6.3        12       823        95
VIS    2025250     20200   14.9300  144.5000       6.1        54       171        92
VIS    2025250     20200   14.9400  147.8600       4.5        23       802        91
VIS    2025250     20200   14.9300  147.7300       4.2        32       800        96
VIS    2025250     20200   14.9300  147.1700       5.3        31       788        91
VIS    2025250     20200   14.9200  145.7100       7.7         7       947        93
VIS    2025250     20200   14.9100  145.6900       8.4         7       947        97
VIS    2025250     20200   14.9100  145.6500       8.4         5       894        95
VIS    2025250     20200   14.9000  145.6500       8.2         6       858        93
VIS    2025250     20200   14.9200  145.6100       5.8        10       802        92
VIS    2025250     20200   14.9200  145.5900       5.9         7       811        96
VIS    2025250     20200   14.9200  145.5700       5.7         9       873        93
VIS    2025250     20200   14.9200  145.4700       7.1         6       905        98
VIS    2025250     20200   14.9100  145.4500       6.7         5       921        98
VIS    2025250     20200   14.9100  145.4300       6.3         6       885        95
VIS    2025250     20200   14.9000  148.1900       5.5        23       915        94
VIS    2025250     20200   14.9100  147.9800       4.7        49       828        90
VIS    2025250     20200   14.9100  147.9600       5.3        48       809        91
VIS    2025250     20200   14.9100  147.1000       4.3        18       790        90
VIS    2025250     20200   14.9100  147.0800       4.7        16       803        90
VIS    2025250     20200   14.9100  147.0600       4.9        16       801        92
VIS    2025250     20200   14.9000  145.7200       6.9         3       931        96
VIS    2025250     20200   14.9000  145.7000       7.8         5       947        99
VIS    2025250     20200   14.8900  145.6600       8.5         5       939        99
VIS    2025250     20200   14.8900  145.6400       8.3         6       854        92
VIS    2025250     20200   14.8900  145.6100       6.3        11       833        93
VIS    2025250     20200   14.8800  145.4900       6.2         4       824        93
VIS    2025250     20200   14.8900  145.4800       6.6         2       921        97
VIS    2025250     20200   14.9000  145.4600       6.7         5       923        98
VIS    2025250     20200   14.9000  145.4300       6.4         5       885        96
VIS    2025250     20200   14.8800  145.4100       6.9         3       848        96
VIS    2025250     20200   14.8800  144.4800       5.3        50       171        90
VIS    2025250     20200   14.9000  148.1900       5.6        24       914        95
VIS    2025250     20200   14.8800  148.1900       5.3        30       895        92
VIS    2025250     20200   14.8900  147.5900       4.1        38       800       100
VIS    2025250     20200   14.8700  147.2500       5.4        31       778        91
VIS    2025250     20200   14.8600  145.6800       6.2         5       937        95
VIS    2025250     20200   14.8600  145.6700       7.4         2       935        99
VIS    2025250     20200   14.8800  145.6300       8.4         5       925        99
VIS    2025250     20200   14.8800  145.6200       8.1         7       915        99
VIS    2025250     20200   14.8600  145.5900       6.6         9       855        98
VIS    2025250     20200   14.8700  145.5800       5.6        13       833        92
VIS    2025250     20200   14.8700  145.5600       4.5        12       807        90
VIS    2025250     20200   14.8700  145.5300       4.9         8       812        91
VIS    2025250     20200   14.8700  145.4900       6.4         4       831        95
VIS    2025250     20200   14.8600  145.4700       6.8         5       837        93
VIS    2025250     20200   14.8600  145.4500       6.4         6       909        92
VIS    2025250     20200   14.8600  145.4300       6.5         5       909        94
VIS    2025250     20200   14.8600  144.5200       5.9        71       171        93
VIS    2025250     20200   14.8700  148.1900       5.3        31       890        91
VIS    2025250     20200   14.8600  147.8700       4.2        32       804        94
VIS    2025250     20200   14.8600  147.2500       5.5        37       781        90
VIS    2025250     20200   14.8300  145.6900       6.7         2       820        93
VIS    2025250     20200   14.8400  145.6700       7.4         1       832        94
VIS    2025250     20200   14.8400  145.6500       7.7         1       887        96
VIS    2025250     20200   14.8500  145.6100       7.8         6       925       100
VIS    2025250     20200   14.8500  145.5900       6.8         9       925        99
VIS    2025250     20200   14.8500  145.5700       5.8        12       918        94
VIS    2025250     20200   14.8300  145.5500       6.7         8       922        95
VIS    2025250     20200   14.8400  145.5200       7.0         5       847        92
VIS    2025250     20200   14.8400  145.4900       6.9         6       812        96
VIS    2025250     20200   14.8400  145.4700       7.1         6       835        92
VIS    2025250     20200   14.8400  145.4400       6.5         6       845        95
VIS    2025250     20200   14.8400  145.4200       6.5         7       839        95
VIS    2025250     20200   14.8300  145.3900       6.7         7       819        92
VIS    2025250     20200   14.8300  144.3800       5.9        59       173        90
VIS    2025250     20200   14.8500  148.1900       4.6        51       879        93
VIS    2025250     20200   14.8400  148.1700       4.1        47       884        92
VIS    2025250     20200   14.8400  148.0300       4.3        44       833        94
VIS    2025250     20200   14.8300  147.9900       4.8        48       843        95
VIS    2025250     20200   14.8400  147.9000       4.5        22       812        93
VIS    2025250     20200   14.8100  145.8300       6.8         3       851        92
VIS    2025250     20200   14.8100  145.8100       6.2         4       851        92
VIS    2025250     20200   14.8100  145.7900       5.0         6       822        92
VIS    2025250     20200   14.8200  145.6900       7.0         1       806        94
VIS    2025250     20200   14.8100  145.6800       7.1         1       806        93
VIS    2025250     20200   14.8200  145.6500       6.3         2       796        90
VIS    2025250     20200   14.8200  145.5400       6.4         7       860        92
VIS    2025250     20200   14.8100  145.5300       6.4         6       860        93
VIS    2025250     20200   14.8200  145.5000       6.4         6       834        94
VIS    2025250     20200   14.8100  145.4800       6.8         7       817        96
VIS    2025250     20200   14.8100  145.4700       7.0         6       817        96
VIS    2025250     20200   14.8300  145.4300       6.8         6       839        96
VIS    2025250     20200   14.8100  145.4100       7.2         4       831        96
VIS    2025250     20200   14.8100  145.4000       7.3         4       807        95
VIS    2025250     20200   14.8200  145.3500       5.9         2       798        96
VIS    2025250     20200   14.8200  145.3500       6.1         1       785        96
VIS    2025250     20200   14.8200  144.3500       5.0        64       176        92
VIS    2025250     20200   14.8200  148.2100       6.1        39       913        92
VIS    2025250     20200   14.8000  148.1800       4.9        29       870        98
VIS    2025250     20200   14.8000  147.9000       5.2        11       882        93
VIS    2025250     20200   14.8100  145.8300       6.9         3       851        91
VIS    2025250     20200   14.8000  145.8200       6.9         5       857        93
VIS    2025250     20200   14.8000  145.7900       5.6         7       822        94
VIS    2025250     20200   14.8000  145.7000       6.7         3       800        90
VIS    2025250     20200   14.8000  145.6700       6.6         2       796        91
VIS    2025250     20200   14.7800  145.5500       4.6         9       831        92
VIS    2025250     20200   14.7800  145.5400       5.1         9       831        95
VIS    2025250     20200   14.7800  145.5000       7.1         6       847        96
VIS    2025250     20200   14.7900  145.4900       6.8         6       837        97
VIS    2025250     20200   14.7900  145.4600       6.5         6       817        96
VIS    2025250     20200   14.8000  145.4400       6.9         6       839        98
VIS    2025250     20200   14.8000  145.4000       7.5         2       824        95
VIS    2025250     20200   14.8000  145.3900       7.2         2       804        95
VIS    2025250     20200   14.7900  145.3500       6.3         4       800        94
VIS    2025250     20200   14.7900  145.3400       6.4         3       785        93
VIS    2025250     20200   14.7900  144.3600       5.4        70       176        90
VIS    2025250     20200   14.8000  148.1700       4.8        31       870        98
VIS    2025250     20200   14.8000  147.9000       4.8        11       882        93
VIS    2025250     20200   14.8000  147.8800       5.9         9       831        92
VIS    2025250     20200   14.7800  147.8600       5.4        19       820        90
VIS    2025250     20200   14.7800  147.8300       6.2         9       814        90
VIS    2025250     20200   14.7900  147.4900       4.8        44       798        91
VIS    2025250     20200   14.7600  145.8000       7.3         4       848        92
VIS    2025250     20200   14.7600  145.7800       6.3         5       799        93
VIS    2025250     20200   14.7800  145.7100       6.0         6       787        96
VIS    2025250     20200   14.7800  145.7000       6.2         5       792        94
VIS    2025250     20200   14.7800  145.6600       5.2         6       791        90
VIS    2025250     20200   14.7700  145.6300       5.1        10       791        92
VIS    2025250     20200   14.7800  145.5500       4.5        10       823        90
VIS    2025250     20200   14.7700  145.5400       4.7        10       820        91
VIS    2025250     20200   14.7800  145.5000       7.1         6       847        96
VIS    2025250     20200   14.7600  145.4900       7.1         6       847        97
VIS    2025250     20200   14.7600  145.4700       6.8         4       800        93
VIS    2025250     20200   14.7800  145.4500       6.3         4       815        93
VIS    2025250     20200   14.7800  145.4200       6.7       359       853        95
VIS    2025250     20200   14.7700  145.3900       6.8       355       851        92
VIS    2025250     20200   14.7800  145.3600       6.6         3       800        96
VIS    2025250     20200   14.7800  145.3500       6.6         4       798        95
VIS    2025250     20200   14.7500  147.8700       4.4        36       840        90
VIS    2025250     20200   14.7700  147.8100       6.8        14       813        90
VIS    2025250     20200   14.7500  147.5000       5.8        37       800        95
VIS    2025250     20200   14.7700  147.4700       4.4        33       797        93
VIS    2025250     20200   14.7600  145.7900       7.1         4       826        92
VIS    2025250     20200   14.7500  145.7900       7.0         4       826        92
VIS    2025250     20200   14.7600  145.7100       6.6         7       787        97
VIS    2025250     20200   14.7500  145.6800       6.2         7       787        92
VIS    2025250     20200   14.7500  145.6700       6.0         6       787        90
VIS    2025250     20200   14.7600  145.6400       5.1         9       791        93
VIS    2025250     20200   14.7500  145.6200       5.1        10       792        94
VIS    2025250     20200   14.7400  145.5400       5.3         8       809        90
VIS    2025250     20200   14.7600  145.5100       6.3         9       847        99
VIS    2025250     20200   14.7600  145.4900       7.0         6       852        97
VIS    2025250     20200   14.7500  145.4800       7.0         4       852        97
VIS    2025250     20200   14.7400  145.4500       6.7         2       844        94
VIS    2025250     20200   14.7400  145.4000       6.1       355       902        92
VIS    2025250     20200   14.7500  145.3600       7.2       359       851        94
VIS    2025250     20200   14.7400  145.3500       7.2       359       869        96
VIS    2025250     20200   14.7300  144.3500       5.5        48       180        97
VIS    2025250     20200   14.7600  149.3800       7.0        50       992        97
VIS    2025250     20200   14.7500  147.9500       4.4        23       813        93
VIS    2025250     20200   14.7500  147.5100       5.5        38       800        90
VIS    2025250     20200   14.7300  145.6000       5.0        11       794        90
VIS    2025250     20200   14.7100  145.5700       5.5         7       794        90
VIS    2025250     20200   14.7200  145.5500       5.3         7       809        90
VIS    2025250     20200   14.7300  145.5300       5.3        11       830        91
VIS    2025250     20200   14.7100  145.4900       5.9        10       917        95
VIS    2025250     20200   14.7300  145.4800       6.3         6       907        99
VIS    2025250     20200   14.7200  145.4400       6.7         2       865        93
VIS    2025250     20200   14.7300  145.3500       7.0         0       902        98
VIS    2025250     20200   14.7200  149.4000       7.9        46       980        91
VIS    2025250     20200   14.7300  148.2400       5.9        37       866        94
VIS    2025250     20200   14.7100  148.0900       5.5        31       885        95
VIS    2025250     20200   14.7100  147.9600       4.9        15       899        94
VIS    2025250     20200   14.7100  147.8300       6.2        13       890        90
VIS    2025250     20200   14.7100  147.3600       5.6        14       785        90
VIS    2025250     20200   14.7200  147.3300       5.1        17       786        92
VIS    2025250     20200   14.7000  145.6900       6.2         6       796        91
VIS    2025250     20200   14.7000  145.6800       6.0         9       797        92
VIS    2025250     20200   14.6900  145.6000       5.8         6       864        93
VIS    2025250     20200   14.7000  145.5700       5.5         7       829        91
VIS    2025250     20200   14.7000  145.5700       5.3         7       830        92
VIS    2025250     20200   14.7000  145.4800       6.6         7       939        96
VIS    2025250     20200   14.7000  145.4700       6.5         7       939        96
VIS    2025250     20200   14.6900  145.4500       6.2         8       934        96
VIS    2025250     20200   14.6900  145.4000       6.2         7       892        98
VIS    2025250     20200   14.7000  145.3900       5.8         7       892        92
VIS    2025250     20200   14.7000  145.3500       5.8         4       937        91
VIS    2025250     20200   14.6800  144.3000       7.9        83       164        91
VIS    2025250     20200   14.7100  149.6300       7.7        62       949        92
VIS    2025250     20200   14.6900  148.2700       5.6        50       859        93
VIS    2025250     20200   14.6900  148.2500       5.3        45       862        95
VIS    2025250     20200   14.6900  148.2300       5.0        44       890        91
VIS    2025250     20200   14.6800  148.1500       5.6        32       889        93
VIS    2025250     20200   14.6900  148.1400       5.4        33       888        93
VIS    2025250     20200   14.6800  148.0800       6.4        21       887        91
VIS    2025250     20200   14.7000  147.8400       6.3        12       891        91
VIS    2025250     20200   14.7000  147.7500       4.6        25       890        91
VIS    2025250     20200   14.7000  147.3700       5.6        14       785        90
VIS    2025250     20200   14.6900  147.3300       5.1        13       786        90
VIS    2025250     20200   14.6800  145.6800       6.7         7       801        90
VIS    2025250     20200   14.6800  145.6700       6.8         7       801        90
VIS    2025250     20200   14.6800  145.6300       6.3         6       864        90
VIS    2025250     20200   14.6700  145.6200       6.8         6       868        92
VIS    2025250     20200   14.6800  145.6000       6.1         6       865        93
VIS    2025250     20200   14.6800  145.5800       5.8         6       837        90
VIS    2025250     20200   14.6800  145.4900       6.4         7       950        90
VIS    2025250     20200   14.6800  145.4800       6.8         6       946        93
VIS    2025250     20200   14.6700  145.4600       6.3         8       939        94
VIS    2025250     20200   14.6600  145.4200       5.7        11       930        93
VIS    2025250     20200   14.6700  145.4000       6.0         9       901        96
VIS    2025250     20200   14.6800  145.3700       5.5         6       902        95
VIS    2025250     20200   14.6800  145.3600       5.5         6       916        93
VIS    2025250     20200   14.6600  145.3400       4.8         3       910        95
VIS    2025250     20200   14.6900  149.6300       7.7        65       966        93
VIS    2025250     20200   14.6800  149.6300       7.6        64       965        91
VIS    2025250     20200   14.6800  148.1600       5.0        36       890        92
VIS    2025250     20200   14.6700  148.1300       6.1        21       886        95
VIS    2025250     20200   14.6800  148.1200       5.6        24       887        96
VIS    2025250     20200   14.6600  148.0600       6.8        20       891        91
VIS    2025250     20200   14.6600  147.8600       6.3         9       895        90
VIS    2025250     20200   14.6700  147.3200       5.5        13       788        90
VIS    2025250     20200   14.6500  145.6600       6.9         2       879        94
VIS    2025250     20200   14.6600  145.6400       7.2         6       890        98
VIS    2025250     20200   14.6600  145.6300       7.1         6       890        98
VIS    2025250     20200   14.6600  145.5900       6.5         4       868        95
VIS    2025250     20200   14.6500  145.4700       7.1         4       952        92
VIS    2025250     20200   14.6500  145.4600       7.0         4       952        93
VIS    2025250     20200   14.6600  145.4400       6.3         8       931        96
VIS    2025250     20200   14.6500  145.4000       6.0         7       931        95
VIS    2025250     20200   14.6500  145.3600       5.3         6       901        92
VIS    2025250     20200   14.6500  145.2800       7.6         1       927       100
VIS    2025250     20200   14.6500  145.2600       8.5       359       937        99
VIS    2025250     20200   14.6500  149.6100       6.8        77       961        90
VIS    2025250     20200   14.6500  149.5800       6.5        75       950        91
VIS    2025250     20200   14.6500  149.5700       6.5        74       943        91
VIS    2025250     20200   14.6400  148.3000       6.5        57       885        91
VIS    2025250     20200   14.6500  148.1700       4.3        29       889        92
VIS    2025250     20200   14.6400  148.1400       5.1        21       887        96
VIS    2025250     20200   14.6500  148.1300       5.4        24       886        97
VIS    2025250     20200   14.6600  148.0600       6.9        19       890        93
VIS    2025250     20200   14.6400  148.0400       5.4        25       900        98
VIS    2025250     20200   14.6400  148.0300       5.2        25       903        97
VIS    2025250     20200   14.6300  147.8500       6.7        12       897        91
VIS    2025250     20200   14.6300  147.4800       5.4        27       791        91
VIS    2025250     20200   14.6500  147.4500       5.2        20       789        90
VIS    2025250     20200   14.6500  147.3900       5.0         7       785        91
VIS    2025250     20200   14.6200  145.6300       6.1         8       917        95
VIS    2025250     20200   14.6200  145.6100       6.2        10       925        97
VIS    2025250     20200   14.6300  145.5800       6.0         5       875        93
VIS    2025250     20200   14.6300  145.4100       6.3         4       934        95
VIS    2025250     20200   14.6300  145.4000       6.4         5       934        94
VIS    2025250     20200   14.6200  145.3700       5.9         7       907        95
VIS    2025250     20200   14.6200  145.3500       5.3         5       886        94
VIS    2025250     20200   14.6300  145.2900       6.6       360       939        97
VIS    2025250     20200   14.6300  145.2700       7.9       359       937        99
VIS    2025250     20200   14.6500  149.5800       6.5        76       950        91
VIS    2025250     20200   14.6300  148.3000       6.4        58       885        91
VIS    2025250     20200   14.6300  148.1900       4.7        38       890        96
VIS    2025250     20200   14.6300  148.0500       5.8        23       901        94
VIS    2025250     20200   14.6300  148.0300       5.4        25       903        97
VIS    2025250     20200   14.6300  147.8600       6.6        14       905        92
VIS    2025250     20200   14.6300  147.8500       6.9        13       901        91
VIS    2025250     20200   14.6100  147.8000       6.4        18       896        94
VIS    2025250     20200   14.6300  147.7700       6.9        16       898        93
VIS    2025250     20200   14.6100  147.7500       6.7        18       898        92
VIS    2025250     20200   14.6100  147.4500       5.8         9       790        90
VIS    2025250     20200   14.6100  145.5900       6.2        10       910        95
VIS    2025250     20200   14.5900  145.5700       5.9         7       872        96
VIS    2025250     20200   14.6100  145.5500       6.5         6       869        94
VIS    2025250     20200   14.6100  145.4200       7.1         2       946        92
VIS    2025250     20200   14.6100  145.4000       6.9         3       934        92
VIS    2025250     20200   14.6100  145.3800       6.4         5       931        95
VIS    2025250     20200   14.6100  145.3600       5.5         6       886        98
VIS    2025250     20200   14.5900  145.3300       6.5       360       869        93
VIS    2025250     20200   14.5900  148.0700       5.9        32       904        90
VIS    2025250     20200   14.5900  148.0700       5.8        31       904        93
VIS    2025250     20200   14.5900  148.0300       6.1        26       914        90
VIS    2025250     20200   14.6000  147.9400       4.7        14       927        91
VIS    2025250     20200   14.6100  147.9200       4.5        19       920        93
VIS    2025250     20200   14.5900  147.9000       6.4        17       931        94
VIS    2025250     20200   14.5900  147.8600       7.1        18       924        90
VIS    2025250     20200   14.5900  147.8200       5.7        23       897        90
VIS    2025250     20200   14.5900  147.7800       6.9        13       897        91
VIS    2025250     20200   14.5900  147.7800       7.1        11       897        90
VIS    2025250     20200   14.5700  145.5700       5.3         7       869        98
VIS    2025250     20200   14.5800  145.5600       5.5         6       873        97
VIS    2025250     20200   14.5900  145.5200       6.1         5       911        97
VIS    2025250     20200   14.5700  145.5000       6.6         1       932        91
VIS    2025250     20200   14.5900  145.4700       8.2         2       968        93
VIS    2025250     20200   14.5700  145.4100       7.2         3       960        90
VIS    2025250     20200   14.5700  145.3800       6.5         6       946        94
VIS    2025250     20200   14.5800  145.3600       6.1         4       902        99
VIS    2025250     20200   14.5900  145.3400       6.2         2       869        96
VIS    2025250     20200   14.5800  145.3300       6.2       359       840        91
VIS    2025250     20200   14.6000  149.5100       6.8        67       954        90
VIS    2025250     20200   14.5700  148.4500       7.2        23       967        96
VIS    2025250     20200   14.5900  148.4400       6.9        31       967        98
VIS    2025250     20200   14.5700  148.4100       6.8        35       965        94
VIS    2025250     20200   14.5700  148.0600       6.2        37       912        96
VIS    2025250     20200   14.5800  147.9500       4.3        18       933        91
VIS    2025250     20200   14.5700  147.9300       6.2        11       939        92
VIS    2025250     20200   14.5600  147.9100       7.3        12       939        94
VIS    2025250     20200   14.5800  147.8900       7.0        16       932        94
VIS    2025250     20200   14.5800  147.7800       7.2        12       897        90
VIS    2025250     20200   14.5800  147.7700       7.4        12       897        90
VIS    2025250     20200   14.5600  147.4400       5.7        15       793        90
VIS    2025250     20200   14.5600  147.3600       5.6        18       822        91
VIS    2025250     20200   14.5600  147.3200       6.3        16       908        99
VIS    2025250     20200   14.5600  145.5700       5.1         6       869        99
VIS    2025250     20200   14.5500  145.5500       5.2         1       911        96
VIS    2025250     20200   14.5600  145.5100       6.4       360       932        96
VIS    2025250     20200   14.5400  145.4500       7.4       359       965        97
VIS    2025250     20200   14.5500  145.4200       7.1       360       955        97
VIS    2025250     20200   14.5600  145.4000       6.6         5       960        90
VIS    2025250     20200   14.5600  145.3700       6.3         7       933        94
VIS    2025250     20200   14.5600  145.3100       6.2       359       831        90
VIS    2025250     20200   14.5600  149.6200       5.5        52       934        96
VIS    2025250     20200   14.5600  148.4600       6.9        22       973        97
VIS    2025250     20200   14.5500  148.4400       6.3        35       963        91
VIS    2025250     20200   14.5500  148.4300       6.3        37       956        96
VIS    2025250     20200   14.5600  148.3600       6.3        65       932        90
VIS    2025250     20200   14.5600  148.3600       6.2        64       912        92
VIS    2025250     20200   14.5600  148.3200       6.3        54       887        92
VIS    2025250     20200   14.5600  148.0600       5.8        37       912        94
VIS    2025250     20200   14.5600  147.9500       5.5        14       952        90
VIS    2025250     20200   14.5600  147.9200       6.7        10       939        92
VIS    2025250     20200   14.5400  147.7900       6.9        14       898        91
VIS    2025250     20200   14.5600  147.6800       6.5        20       878        91
VIS    2025250     20200   14.5500  147.3300       6.9        21       921        98
VIS    2025250     20200   14.5400  145.5500       4.6         0       896        97
VIS    2025250     20200   14.5200  145.4700       6.5       359       956        91
VIS    2025250     20200   14.5300  145.4400       7.5         1       955        99
VIS    2025250     20200   14.5400  145.4200       7.2         0       955        97
VIS    2025250     20200   14.5300  145.3800       6.7         4       938        97
VIS    2025250     20200   14.5300  149.6000       6.0        40       934        95
VIS    2025250     20200   14.5300  149.5800       6.1        37       935        94
VIS    2025250     20200   14.5300  149.5700       6.5        28       935        93
VIS    2025250     20200   14.5300  149.4300       7.4        54       944        98
VIS    2025250     20200   14.5400  149.4100       6.8        59       955        97
VIS    2025250     20200   14.5400  149.4000       6.7        61       971        94
VIS    2025250     20200   14.5300  148.1400       5.3        25       904        90
VIS    2025250     20200   14.5300  148.1100       4.8        25       912        96
VIS    2025250     20200   14.5200  147.9300       6.8         9       960        91
VIS    2025250     20200   14.5300  147.9100       7.6        10       952        92
VIS    2025250     20200   14.5200  147.8100       7.0        13       907        90
VIS    2025250     20200   14.5300  147.7900       7.2        13       898        90
VIS    2025250     20200   14.5100  147.7700       7.4        12       900        90
VIS    2025250     20200   14.5300  147.6500       6.7        20       896        93
VIS    2025250     20200   14.5200  145.4300       7.4         3       956        96
VIS    2025250     20200   14.5200  145.4300       7.5         2       955        96
VIS    2025250     20200   14.5200  145.4100       7.4         3       954        98
VIS    2025250     20200   14.5000  145.3700       6.5         1       876        96
VIS    2025250     20200   14.5300  149.5900       5.9        39       934        95
VIS    2025250     20200   14.5200  149.4500       7.2        52       940        92
VIS    2025250     20200   14.5200  149.4300       7.4        55       944        97
VIS    2025250     20200   14.5200  149.4200       7.4        55       944        98
VIS    2025250     20200   14.5100  148.1700       6.2        19       920        90
VIS    2025250     20200   14.4900  148.1400       5.6        19       932        93
VIS    2025250     20200   14.5000  148.0400       6.3        28       915        92
VIS    2025250     20200   14.5100  148.0200       6.8        31       906        90
VIS    2025250     20200   14.4900  148.0000       7.5        28       920        98
VIS    2025250     20200   14.5100  147.9100       6.0        12       960        92
VIS    2025250     20200   14.5100  147.9100       6.1        12       960        92
VIS    2025250     20200   14.5100  147.8700       6.2         9       939        91
VIS    2025250     20200   14.5100  147.8400       7.1        13       921        92
VIS    2025250     20200   14.5000  147.8300       6.8        18       921        94
VIS    2025250     20200   14.5000  147.7900       6.7        15       903        93
VIS    2025250     20200   14.5100  147.7700       7.6        12       900        90
VIS    2025250     20200   14.4900  147.7500       7.8        13       903        90
VIS    2025250     20200   14.4900  147.6400       6.5        11       906        93
VIS    2025250     20200   14.4900  147.4400       5.7        21       903        96
VIS    2025250     20200   14.4800  145.4900       4.7         8       893        90
VIS    2025250     20200   14.4900  145.3700       6.3         1       876        98
VIS    2025250     20200   14.4800  149.6100       5.3        50       958        90
VIS    2025250     20200   14.5000  149.5900       5.5        38       942        93
VIS    2025250     20200   14.5000  149.5000       6.8        26       974        90
VIS    2025250     20200   14.5000  149.4500       6.6        48       956        92
VIS    2025250     20200   14.4900  148.1800       6.0        22       932        94
VIS    2025250     20200   14.4700  148.1500       6.5        22       932        90
VIS    2025250     20200   14.4700  148.0800       5.9        35       909        93
VIS    2025250     20200   14.4700  148.0500       6.1        36       915        95
VIS    2025250     20200   14.4900  148.0200       7.6        29       920        97
VIS    2025250     20200   14.4800  148.0100       7.6        29       920        96
VIS    2025250     20200   14.4900  147.9800       7.4        50       942        92
VIS    2025250     20200   14.4900  147.7800       6.7        16       910        95
VIS    2025250     20200   14.4900  147.7500       7.4        15       904        92
VIS    2025250     20200   14.4800  147.7500       7.2        15       904        92
VIS    2025250     20200   14.4800  147.7200       7.0        15       888        90
VIS    2025250     20200   14.4800  147.6900       8.3        13       911        92
VIS    2025250     20200   14.4700  147.6600       7.7        15       917        93
VIS    2025250     20200   14.4700  147.6500       7.2        13       911        91
VIS    2025250     20200   14.4800  147.4400       5.8        22       903        99
VIS    2025250     20200   14.4800  147.4400       5.5        24       903        96
VIS    2025250     20200   14.4600  145.8400       7.3         3       965        96
VIS    2025250     20200   14.4500  145.3600       4.9         5       913        95
VIS    2025250     20200   14.4600  148.2700       6.5        25       927        97
VIS    2025250     20200   14.4600  148.1000       7.1        32       914        90
VIS    2025250     20200   14.4600  148.0800       6.2        35       909        95
VIS    2025250     20200   14.4600  148.0500       5.4        40       909        96
VIS    2025250     20200   14.4400  148.0100       6.6        42       918        93
VIS    2025250     20200   14.4500  148.0000       6.9        39       920        94
VIS    2025250     20200   14.4500  147.8500       7.6         8       942        91
VIS    2025250     20200   14.4400  147.7600       7.3        19       919        95
VIS    2025250     20200   14.4500  147.7400       6.3        22       910        96
VIS    2025250     20200   14.4500  147.7300       6.3        20       909        97
VIS    2025250     20200   14.4600  147.6900       7.5        18       911        91
VIS    2025250     20200   14.4600  147.6700       8.1        16       930        95
VIS    2025250     20200   14.4400  147.6600       7.9        17       911        93
VIS    2025250     20200   14.4500  147.5100       6.7        28       875        91
VIS    2025250     20200   14.4300  145.4800       5.1         3       846        94
VIS    2025250     20200   14.4400  145.3600       6.1         4       924        97
VIS    2025250     20200   14.4400  148.0900       7.5        29       914        97
VIS    2025250     20200   14.4400  148.0400       4.6        43       906        94
VIS    2025250     20200   14.4400  148.0000       6.2        44       918        95
VIS    2025250     20200   14.4200  147.9700       5.3        35       901        91
VIS    2025250     20200   14.4200  147.9500       5.5        26       917        95
VIS    2025250     20200   14.4300  147.7100       6.6        12       922        98
VIS    2025250     20200   14.4200  147.6900       6.7         6       901        93
VIS    2025250     20200   14.4300  147.6600       7.6        15       901        90
VIS    2025250     20200   14.4400  147.6100       8.0        24       927        90
VIS    2025250     20200   14.4100  145.7600       7.1         4       913        95
VIS    2025250     20200   14.4000  145.5500       4.7       359       797        92
VIS    2025250     20200   14.4200  145.4800       5.2         2       846        95
VIS    2025250     20200   14.4200  145.4600       4.7         2       873        91
VIS    2025250     20200   14.4200  148.1900       6.4        25       923        90
VIS    2025250     20200   14.4000  148.0200       4.4        38       906        97
VIS    2025250     20200   14.4200  148.0000       5.2        43       916        97
VIS    2025250     20200   14.4100  147.7800       8.4        16       952        95
VIS    2025250     20200   14.4000  147.7600       6.1        25       952        94
VIS    2025250     20200   14.4100  147.7400       6.0        25       930        95
VIS    2025250     20200   14.3900  147.7000       6.0         8       936        92
VIS    2025250     20200   14.4100  147.6800       6.7         6       901        94
VIS    2025250     20200   14.4100  147.6700       6.8         8       901        94
VIS    2025250     20200   14.4000  147.6300       7.2        24       908        92
VIS    2025250     20200   14.4100  147.6000       7.9        27       908        93
VIS    2025250     20200   14.4000  147.5800       7.7        19       909        95
VIS    2025250     20200   14.4100  147.5200       6.3        21       940        93
VIS    2025250     20200   14.3800  145.7700       7.2         0       949        93
VIS    2025250     20200   14.4000  145.7500       6.8         3       913        95
VIS    2025250     20200   14.3900  145.6100       5.2         3       835        92
VIS    2025250     20200   14.3900  145.6000       4.9         2       803        91
VIS    2025250     20200   14.3900  145.5800       4.6         1       803        97
VIS    2025250     20200   14.3900  145.5500       5.1       360       793        95
VIS    2025250     20200   14.3800  145.5300       5.7       357       792        91
VIS    2025250     20200   14.3900  148.1500       5.9        22       941        92
VIS    2025250     20200   14.3700  148.0300       5.0        42       906        91
VIS    2025250     20200   14.3900  148.0200       5.3        34       906        99
VIS    2025250     20200   14.3800  147.9900       5.8        26       893        93
VIS    2025250     20200   14.3700  147.9500       4.8        26       899        92
VIS    2025250     20200   14.3900  147.7000       5.6        12       947        92
VIS    2025250     20200   14.3800  147.6400       6.6        20       917        92
VIS    2025250     20200   14.3900  147.5900       7.7        19       911        95
VIS    2025250     20200   14.3800  147.5700       7.4        16       922        97
VIS    2025250     20200   14.3900  147.5600       7.2        14       926        98
VIS    2025250     20200   14.3700  145.7800       7.0       360       955        94
VIS    2025250     20200   14.3700  145.7500       6.2         1       939        93
VIS    2025250     20200   14.3700  145.7400       5.7         0       913        97
VIS    2025250     20200   14.3600  145.6300       5.6         2       835        93
VIS    2025250     20200   14.3700  145.6000       5.3         1       835        94
VIS    2025250     20200   14.3600  145.5900       5.4         1       837        92
VIS    2025250     20200   14.3500  145.5700       4.8         1       879        95
VIS    2025250     20200   14.3700  145.5400       5.9       357       799        93
VIS    2025250     20200   14.3600  145.5200       5.9       358       866        97
VIS    2025250     20200   14.3600  145.4800       5.0         1       847        90
VIS    2025250     20200   14.3800  149.6100       6.8        53       955        92
VIS    2025250     20200   14.3700  147.9500       4.9        27       899        94
VIS    2025250     20200   14.3600  147.5700       7.7        21       922        97
VIS    2025250     20200   14.3600  147.5700       7.7        21       922        97
VIS    2025250     20200   14.3500  145.7700       6.7         2       960        90
VIS    2025250     20200   14.3300  145.6400       5.5         4       820        91
VIS    2025250     20200   14.3300  145.5900       5.0         4       879        94
VIS    2025250     20200   14.3400  145.5700       4.8         2       879        93
VIS    2025250     20200   14.3500  145.5400       5.7       357       902        99
VIS    2025250     20200   14.3500  145.5100       6.1       358       895       100
VIS    2025250     20200   14.3500  145.4800       5.4         1       847        93
VIS    2025250     20200   14.3500  145.4700       5.3         1       847        94
VIS    2025250     20200   14.3400  145.4400       5.0         1       847        95
VIS    2025250     20200   14.3300  145.2900       5.4       357       833        90
VIS    2025250     20200   14.3400  149.5800       6.8        49       956        96
VIS    2025250     20200   14.3400  149.5800       6.6        51       958        96
VIS    2025250     20200   14.3500  149.5400       6.5        69       965        93
VIS    2025250     20200   14.3400  149.5300       6.4        72       965        91
VIS    2025250     20200   14.3400  149.5100       6.1        65       965        94
VIS    2025250     20200   14.3300  148.1500       6.5        33       959        95
VIS    2025250     20200   14.3100  145.7900       6.4         3       940        95
VIS    2025250     20200   14.3300  145.7600       6.5         4       953        94
VIS    2025250     20200   14.3200  145.7600       6.5         4       950        94
VIS    2025250     20200   14.3200  145.7300       6.0         3       904        97
VIS    2025250     20200   14.3200  145.6500       5.3         4       820        93
VIS    2025250     20200   14.3300  145.5800       4.4         6       887        90
VIS    2025250     20200   14.3300  145.5000       6.1         1       948        96
VIS    2025250     20200   14.3300  145.4800       6.1         3       927        97
VIS    2025250     20200   14.3100  145.4700       5.3         1       927        95
VIS    2025250     20200   14.3200  145.4400       5.6         2       873        99
VIS    2025250     20200   14.3100  145.3200       4.6       356       849        91
VIS    2025250     20200   14.3100  145.2600       5.7       359       833        92
VIS    2025250     20200   14.3200  145.2500       4.9       359       812        91
VIS    2025250     20200   14.3300  149.6100       7.2        49       949        93
VIS    2025250     20200   14.3200  149.5900       7.4        46       951        93
VIS    2025250     20200   14.3300  149.5800       6.8        48       956        94
VIS    2025250     20200   14.3100  149.5500       6.6        63       973        95
VIS    2025250     20200   14.3300  149.5100       6.2        67       965        94
VIS    2025250     20200   14.3300  149.5100       6.1        65       965        94
VIS    2025250     20200   14.3100  148.0800       6.7        33       932        93
VIS    2025250     20200   14.3000  148.0400       6.4        25       940        94
VIS    2025250     20200   14.3200  147.8200       6.8        18       960        90
VIS    2025250     20200   14.3000  147.5400       6.7        16       931        97
VIS    2025250     20200   14.3000  145.7800       6.5         4       940        95
VIS    2025250     20200   14.3000  145.7500       6.6         3       935        95
VIS    2025250     20200   14.2900  145.6600       5.5         6       832        90
VIS    2025250     20200   14.2800  145.5800       4.6         4       828        94
VIS    2025250     20200   14.2900  145.5700       4.2         5       828        91
VIS    2025250     20200   14.2900  145.4500       5.3         2       925        93
VIS    2025250     20200   14.3000  145.4100       5.9         2       879        92
VIS    2025250     20200   14.2900  145.3900       4.7         3       864        97
VIS    2025250     20200   14.2900  145.3800       4.6         2       847        93
VIS    2025250     20200   14.2800  145.3200       4.8       357       840        98
VIS    2025250     20200   14.2900  145.3100       4.5       357       831        99
VIS    2025250     20200   14.2800  145.2700       5.0       359       810        96
VIS    2025250     20200   14.3000  145.2600       5.6         0       832        93
VIS    2025250     20200   14.2900  145.2200       4.9         1       777        97
VIS    2025250     20200   14.2700  143.1300       4.1        74       191        91
VIS    2025250     20200   14.2800  143.1100       4.1        71       191        92
VIS    2025250     20200   14.3100  149.5500       6.4        60       973        95
VIS    2025250     20200   14.2900  149.5000       5.4        68       978        92
VIS    2025250     20200   14.3000  148.0700       6.5        34       932        90
VIS    2025250     20200   14.2700  147.6800       4.5        27       803        96
VIS    2025250     20200   14.2700  147.5400       6.2        23       893        95
VIS    2025250     20200   14.2600  145.6100       4.5         5       795        92
VIS    2025250     20200   14.2600  145.6000       4.8         4       796        95
VIS    2025250     20200   14.2800  145.5800       4.7         3       827        94
VIS    2025250     20200   14.2700  145.3300       4.8       357       844        97
VIS    2025250     20200   14.2700  145.3100       5.2       357       831        96
VIS    2025250     20200   14.2600  145.2900       4.9       359       799        95
VIS    2025250     20200   14.2600  145.2600       5.1         3       781        94
VIS    2025250     20200   14.2800  145.2300       5.2         2       777        99
VIS    2025250     20200   14.2600  145.2100       5.4         3       760        99
VIS    2025250     20200   14.2600  144.5700       4.6       345       825        93
VIS    2025250     20200   14.2900  149.5200       5.8        58       968        94
VIS    2025250     20200   14.2700  148.0000       6.6        31       939        97
VIS    2025250     20200   14.2700  147.6800       4.4        26       802        97
VIS    2025250     20200   14.2500  147.5700       4.7        20       876        92
VIS    2025250     20200   14.2500  147.5600       5.0        20       878        93
VIS    2025250     20200   14.2700  147.5100       6.0        35       898        92
VIS    2025250     20200   14.2400  145.5800       4.0         4       797        95
VIS    2025250     20200   14.2500  145.2700       4.5         2       789        96
VIS    2025250     20200   14.2500  145.2600       4.8         3       781        95
VIS    2025250     20200   14.2400  145.2300       5.6         3       769        97
VIS    2025250     20200   14.2300  147.9200       6.6        34       936        91
VIS    2025250     20200   14.2400  147.7900       5.1        30       897        94
VIS    2025250     20200   14.2400  147.7500       4.8        26       846        90
VIS    2025250     20200   14.2400  147.5600       5.2        23       878        93
VIS    2025250     20200   14.2300  147.5200       7.3        25       899        90
VIS    2025250     20200   14.2300  147.0300       5.4        19       899        94
VIS    2025250     20200   14.2300  147.0200       4.6        25       894        90
VIS    2025250     20200   14.2100  145.2400       4.3         0       775        95
VIS    2025250     20200   14.2100  148.3600       6.0        58       963        91
VIS    2025250     20200   14.2200  147.9100       6.3        34       936        90
VIS    2025250     20200   14.2100  147.8800       5.4        35       964        95
VIS    2025250     20200   14.2200  147.8000       5.7        24       900        93
VIS    2025250     20200   14.2200  147.7800       5.9        18       895        99
VIS    2025250     20200   14.2100  147.5500       6.7        22       911        98
VIS    2025250     20200   14.2100  147.5400       7.6        21       926        94
VIS    2025250     20200   14.2100  147.5200       8.2        19       911        94
VIS    2025250     20200   14.1900  146.2200       4.1         9       811        91
VIS    2025250     20200   14.1800  148.2700       7.2        32       962        97
VIS    2025250     20200   14.1800  148.2600       7.1        29       962        91
VIS    2025250     20200   14.2000  147.8900       6.1        33       964        94
VIS    2025250     20200   14.2000  147.8900       5.7        34       964        94
VIS    2025250     20200   14.2000  147.8700       5.9        33       963        97
VIS    2025250     20200   14.1900  147.8300       5.8        27       914        96
VIS    2025250     20200   14.1900  147.8000       5.4        23       906        90
VIS    2025250     20200   14.1900  147.5700       5.2        23       897        99
VIS    2025250     20200   14.2000  147.5400       7.5        21       933        95
VIS    2025250     20200   14.1900  146.2300       4.5         7       830        91
VIS    2025250     20200   14.1900  146.2200       4.4         8       811        93
VIS    2025250     20200   14.1900  146.1900       4.6         8       858        93
VIS    2025250     20200   14.1900  146.1700       4.2         8       878        97
VIS    2025250     20200   14.1800  145.9100       4.9         9       931        92
VIS    2025250     20200   14.1800  145.8800       4.9         7       902        92
VIS    2025250     20200   14.1700  145.6300       4.2         6       786        90
VIS    2025250     20200   14.1700  148.3600       7.6        56       951        90
VIS    2025250     20200   14.1600  148.3600       7.6        54       914        93
VIS    2025250     20200   14.1700  148.2700       7.0        32       948        95
VIS    2025250     20200   14.1800  148.2600       7.2        28       962        94
VIS    2025250     20200   14.1800  147.8600       6.0        26       940        98
VIS    2025250     20200   14.1800  147.8400       5.4        22       920        97
VIS    2025250     20200   14.1700  147.5800       5.6        20       905        99
VIS    2025250     20200   14.1600  147.5400       7.3        24       938        97
VIS    2025250     20200   14.1600  146.1700       5.9         8       931        96
VIS    2025250     20200   14.1600  146.1500       4.9         6       935        94
VIS    2025250     20200   14.1500  146.1100       4.6         4       908        97
VIS    2025250     20200   14.1600  146.0900       4.3         7       883        96
VIS    2025250     20200   14.1400  146.0700       4.4        14       860        92
VIS    2025250     20200   14.1600  145.9000       5.1         4       936        94
VIS    2025250     20200   14.1500  145.8500       4.5         5       871        98
VIS    2025250     20200   14.1500  145.8400       4.3         7       847        91
VIS    2025250     20200   14.1400  148.6700       6.4        59       969        91
VIS    2025250     20200   14.1400  148.3700       7.9        49       961        92
VIS    2025250     20200   14.1600  148.2800       7.0        43       929        99
VIS    2025250     20200   14.1500  147.5900       6.0        11       905        92
VIS    2025250     20200   14.1500  147.5600       6.9        25       938       100
VIS    2025250     20200   14.1200  146.2000       6.1         3       953        97
VIS    2025250     20200   14.1400  146.1200       5.9         7       937        98
VIS    2025250     20200   14.1400  146.1000       5.7         8       908       100
VIS    2025250     20200   14.1400  146.0800       5.1        10       867        93
VIS    2025250     20200   14.1400  145.9500       4.8         5       867        90
VIS    2025250     20200   14.1200  145.9100       4.1         7       946        90
VIS    2025250     20200   14.1400  145.8700       4.3         2       911        91
VIS    2025250     20200   14.1100  145.2100       4.7       358       762        92
VIS    2025250     20200   14.1200  145.2000       4.7         3       762        90
VIS    2025250     20200   14.1100  145.1700       4.2         1       739        92
VIS    2025250     20200   14.1200  148.6800       6.3        59       969        91
VIS    2025250     20200   14.1200  148.3500       8.0        33       947        95
VIS    2025250     20200   14.1300  148.3400       7.9        36       942        92
VIS    2025250     20200   14.1100  147.0400       8.1        13       942        91
VIS    2025250     20200   14.1100  147.0200       7.0        12       881        91
VIS    2025250     20200   14.1100  146.1200       6.4        15       937        96
VIS    2025250     20200   14.1100  146.1100       6.1        17       937        96
VIS    2025250     20200   14.0900  145.9700       4.3        17       895        94
VIS    2025250     20200   14.1100  145.2200       4.6       356       762        92
VIS    2025250     20200   14.1000  145.1800       4.5       359       761        93
VIS    2025250     20200   14.1100  145.1700       4.2       359       739        93
VIS    2025250     20200   14.0900  144.4700       5.0       355       947        92
VIS    2025250     20200   14.1000  148.3700       5.8        43       952        93
VIS    2025250     20200   14.0900  147.8500       7.2         9       923        93
VIS    2025250     20200   14.0900  147.8200       6.3        13       929        94
VIS    2025250     20200   14.0900  147.5800       4.0        23       886        94
VIS    2025250     20200   14.0800  147.0200       5.4        17       906        96
VIS    2025250     20200   14.0800  146.2300       5.2         6       949        91
VIS    2025250     20200   14.0900  145.9700       4.4        16       910        92
VIS    2025250     20200   14.0700  145.7700       4.4        11       821        91
VIS    2025250     20200   14.0800  144.5000       4.8       355       898        91
VIS    2025250     20200   14.0800  144.4600       5.2       354       946        90
VIS    2025250     20200   14.0800  148.4500       5.5        38       954        96
VIS    2025250     20200   14.0700  148.3700       5.3        37       952        94
VIS    2025250     20200   14.0600  148.1900       8.4        45       953        92
VIS    2025250     20200   14.0600  148.1800       8.3        43       953        95
VIS    2025250     20200   14.0700  148.0600       6.9        37       953       100
VIS    2025250     20200   14.0800  147.8500       7.5         5       923        92
VIS    2025250     20200   14.0800  147.8400       7.3         4       923        92
VIS    2025250     20200   14.0800  147.6500       7.0        19       894        95
VIS    2025250     20200   14.0800  147.5700       4.1        21       885        98
VIS    2025250     20200   14.0600  146.2500       6.1         8       918        99
VIS    2025250     20200   14.0600  146.2400       6.0         8       918        99
VIS    2025250     20200   14.0600  145.5500       4.5         1       818        90
VIS    2025250     20200   14.0400  145.3800       4.6         1       832        91
VIS    2025250     20200   14.0500  148.5600       6.3        65       948        90
VIS    2025250     20200   14.0500  148.4300       5.4        39       956        95
VIS    2025250     20200   14.0600  148.3800       5.6        31       967        93
VIS    2025250     20200   14.0600  148.3700       5.3        40       957        96
VIS    2025250     20200   14.0600  148.1800       8.2        45       953        93
VIS    2025250     20200   14.0400  148.1600       7.4        44       951        98
VIS    2025250     20200   14.0600  148.1200       7.1        23       982        91
VIS    2025250     20200   14.0600  148.0700       7.6        38       953        98
VIS    2025250     20200   14.0600  148.0600       7.3        38       936        99
VIS    2025250     20200   14.0600  148.0300       6.5        41       920        94
VIS    2025250     20200   14.0400  147.6600       6.7        22       901        91
VIS    2025250     20200   14.0400  146.2500       6.4         8       918        99
VIS    2025250     20200   14.0400  145.8500       4.0         7       935        90
VIS    2025250     20200   14.0400  145.4600       4.0       355       870        98
VIS    2025250     20200   14.0200  145.2000       4.1       357       780        91
VIS    2025250     20200   14.0200  144.3700       5.7       348       920        92
VIS    2025250     20200   14.0200  144.3600       5.3       347       913        92
VIS    2025250     20200   14.0200  144.3400       4.7       344       913        94
VIS    2025250     20200   14.0200  148.4000       5.8        18       957        97
VIS    2025250     20200   14.0300  148.1600       6.6        63       933        90
VIS    2025250     20200   14.0300  148.1200       6.1        38       970        96
VIS    2025250     20200   14.0300  148.0900       5.8        35       968        92
VIS    2025250     20200   14.0200  147.7400       5.1        25       867        91
VIS    2025250     20200   14.0100  147.7200       5.4        21       882        94
VIS    2025250     20200   14.0300  147.6700       7.0        25       896        91
VIS    2025250     20200   14.0300  147.6500       6.7        21       901        90
VIS    2025250     20200   14.0100  145.2000       4.2       356       780        92
VIS    2025250     20200   13.9900  144.4600       6.4       352       907        92
VIS    2025250     20200   14.0100  144.3700       5.5       347       913        92
VIS    2025250     20200   14.0100  144.3500       4.7       342       921        96
VIS    2025250     20200   14.0100  144.3200       4.9       347       918        93
VIS    2025250     20200   14.0100  144.3100       5.1       347       913        91
VIS    2025250     20200   14.0000  144.2600       4.5       333       818        93
VIS    2025250     20200   14.0100  148.4000       5.3        20       957        95
VIS    2025250     20200   13.9900  147.7300       5.5         8       882        93
VIS    2025250     20200   14.0000  147.7000       5.9        15       896        94
VIS    2025250     20200   13.9900  147.6800       6.6        16       901        90
VIS    2025250     20200   14.0000  147.6700       7.0        19       901        93
VIS    2025250     20200   13.9900  146.9400       4.6        13       802        95
VIS    2025250     20200   13.9900  145.7400       5.1         4       888        93
VIS    2025250     20200   13.9800  144.3400       4.3       336       897        93
VIS    2025250     20200   13.9800  144.2400       4.2       335       821        96
VIS    2025250     20200   13.9800  148.4200       6.5        30       967       100
VIS    2025250     20200   13.9800  148.2500       4.7        37       860        94
VIS    2025250     20200   13.9700  148.0100       6.8        25       916        92
VIS    2025250     20200   13.9900  147.9900       6.6        22       902        90
VIS    2025250     20200   13.9700  147.7600       4.4        21       893        98
VIS    2025250     20200   13.9700  147.7500       4.6        16       867        98
VIS    2025250     20200   13.9700  146.9500       4.5        13       814        96
VIS    2025250     20200   13.9800  146.9400       4.0        11       802        96
VIS    2025250     20200   13.9700  146.1100       5.1        26       935        94
VIS    2025250     20200   13.9700  145.6100       4.3         6       966        92
VIS    2025250     20200   13.9600  145.3700       4.4         3       882        96
VIS    2025250     20200   13.9700  145.3500       4.2       357       862        92
VIS    2025250     20200   13.9600  144.3100       4.9       343       900        91
VIS    2025250     20200   13.9600  148.8400       5.7        64       933        91
VIS    2025250     20200   13.9600  148.8300       5.6        63       933        90
VIS    2025250     20200   13.9500  147.9100       5.4        20       900        97
VIS    2025250     20200   13.9600  147.7500       4.7        15       867        98
VIS    2025250     20200   13.9600  147.1100       8.7         4       935        92
VIS    2025250     20200   13.9500  147.0000       4.5        14       863        93
VIS    2025250     20200   13.9300  145.3800       4.1         3       892        95
VIS    2025250     20200   13.9400  145.3700       4.8         0       885        95
VIS    2025250     20200   13.9300  148.8500       6.3        77       886        90
VIS    2025250     20200   13.9300  148.1600       5.0        22       941        91
VIS    2025250     20200   13.9400  147.9200       5.2        20       899        91
VIS    2025250     20200   13.9400  147.9000       5.5        15       901        97
VIS    2025250     20200   13.9200  147.7600       5.6        12       895        96
VIS    2025250     20200   13.9400  147.7500       5.3        13       859        91
VIS    2025250     20200   13.9200  147.0900       6.9        12       973        99
VIS    2025250     20200   13.9200  146.7600       4.3        16       956        91
VIS    2025250     20200   13.9100  145.8600       5.7       359       933        95
VIS    2025250     20200   13.9000  145.8600       5.4       359       933        95
VIS    2025250     20200   13.9200  145.3700       4.1        10       887        90
VIS    2025250     20200   13.9100  148.9900       5.9        52       920        96
VIS    2025250     20200   13.9200  148.9900       5.8        52       920        95
VIS    2025250     20200   13.9100  148.9400       5.8        53       941        94
VIS    2025250     20200   13.9000  148.3200       6.4        43       928        99
VIS    2025250     20200   13.9100  147.9100       6.0        15       903        94
VIS    2025250     20200   13.8900  147.7800       6.2         9       914        92
VIS    2025250     20200   13.9100  147.7600       5.8        10       905        92
VIS    2025250     20200   13.9100  147.7500       5.7        10       895        93
VIS    2025250     20200   13.9000  147.0900       7.3        10       976        94
VIS    2025250     20200   13.8800  146.4300       5.0         3       906        96
VIS    2025250     20200   13.8900  145.8500       5.2       358       910        96
VIS    2025250     20200   13.8800  145.8400       5.2         0       904        95
VIS    2025250     20200   13.9000  149.0100       6.1        54       924        91
VIS    2025250     20200   13.8900  148.9500       5.9        52       920        91
VIS    2025250     20200   13.9000  148.9200       6.0        53       942        96
VIS    2025250     20200   13.9000  148.9100       6.0        59       963        91
VIS    2025250     20200   13.8900  148.3200       6.3        36       932       100
VIS    2025250     20200   13.8900  147.8100       5.6        18       915        92
VIS    2025250     20200   13.8900  147.8000       6.0        13       915        94
VIS    2025250     20200   13.8700  147.0400       5.7        17       956        94
VIS    2025250     20200   13.8700  146.9100       4.1         9       951        91
VIS    2025250     20200   13.8700  145.5800       4.3         2       905        94
VIS    2025250     20200   13.8500  145.5600       4.1         2       888        95
VIS    2025250     20200   13.8700  149.0800       6.0        55       972        95
VIS    2025250     20200   13.8700  148.3200       5.3        33       955        96
VIS    2025250     20200   13.8400  147.2200       5.7        12       964        90
VIS    2025250     20200   13.8500  145.9400       7.2         4       973        92
VIS    2025250     20200   13.8500  145.9300       7.1         3       973        90
VIS    2025250     20200   13.8300  145.8900       6.2         5       961        91
VIS    2025250     20200   13.8400  145.5700       4.1         7       863        91
VIS    2025250     20200   13.8400  148.0400       4.1        47       969        91
VIS    2025250     20200   13.8400  147.8400       5.1        20       914        92
VIS    2025250     20200   13.8300  147.2300       5.8        11       957        92
VIS    2025250     20200   13.8200  147.1400       7.1         1       961        92
VIS    2025250     20200   13.8200  147.1300       7.3         0       966        93
VIS    2025250     20200   13.8300  147.0500       5.0        10       956        92
VIS    2025250     20200   13.8200  145.9100       6.0         6       961        90
VIS    2025250     20200   13.8300  145.8900       6.2         5       961        94
VIS    2025250     20200   13.8200  145.8400       5.5         4       932        92
VIS    2025250     20200   13.8200  145.8300       5.1         3       914        95
VIS    2025250     20200   13.7900  143.3100       7.4       302       781        98
VIS    2025250     20200   13.7900  143.2800       7.5       298       755        95
VIS    2025250     20200   13.8300  148.8200       5.0        49       943        91
VIS    2025250     20200   13.8200  148.8100       4.7        51       943        94
VIS    2025250     20200   13.8100  148.7700       4.9        43       974        95
VIS    2025250     20200   13.8100  148.7600       4.8        39       968        96
VIS    2025250     20200   13.8100  148.2000       5.2        30       956        92
VIS    2025250     20200   13.8100  147.9400       4.8        53       918        90
VIS    2025250     20200   13.8000  147.4500       7.9        13       949        95
VIS    2025250     20200   13.8000  147.3800       7.1        10       950        91
VIS    2025250     20200   13.8000  147.3600       6.7        11       950        95
VIS    2025250     20200   13.8100  147.1500       7.1         3       959        93
VIS    2025250     20200   13.8000  147.1200       7.2         3       966        93
VIS    2025250     20200   13.7900  147.0800       6.3         8       968        97
VIS    2025250     20200   13.8100  147.0300       4.8        13       954        94
VIS    2025250     20200   13.7900  147.0200       5.4        11       952        97
VIS    2025250     20200   13.8100  147.0000       4.2        19       954        92
VIS    2025250     20200   13.8100  146.8800       5.3        13       974        94
VIS    2025250     20200   13.8000  145.9100       6.1         7       961        91
VIS    2025250     20200   13.8000  145.8800       6.4         5       953        97
VIS    2025250     20200   13.7800  145.8600       6.4         3       939        98
VIS    2025250     20200   13.8000  145.8300       5.7         5       932        96
VIS    2025250     20200   13.8000  145.8100       5.0         7       910        98
VIS    2025250     20200   13.8000  145.8100       5.1         6       914        98
VIS    2025250     20200   13.7800  145.7200       5.0       358       906        97
VIS    2025250     20200   13.7800  145.7100       5.4       360       943        97
VIS    2025250     20200   13.7700  143.3400       5.4       284       787        92
VIS    2025250     20200   13.7900  143.3100       7.6       303       781        97
VIS    2025250     20200   13.7900  143.3100       7.9       304       784        96
VIS    2025250     20200   13.8100  149.1100       5.6        38       984        91
VIS    2025250     20200   13.8000  148.7700       4.9        42       974        91
VIS    2025250     20200   13.7900  147.8700       5.6        37       926        95
VIS    2025250     20200   13.7900  147.3700       6.8        10       950        95
VIS    2025250     20200   13.7900  147.3600       6.6        11       950        95
VIS    2025250     20200   13.7700  147.1200       5.7        11       952        95
VIS    2025250     20200   13.7800  147.1100       6.6         6       961        94
VIS    2025250     20200   13.7900  147.0800       6.3         8       968        97
VIS    2025250     20200   13.7700  147.0700       6.6         8       966        94
VIS    2025250     20200   13.7900  147.0300       6.1         9       956        97
VIS    2025250     20200   13.7800  145.8900       6.5         7       946        97
VIS    2025250     20200   13.7800  145.8600       6.3         4       939        98
VIS    2025250     20200   13.7800  145.8600       6.4         4       939        98
VIS    2025250     20200   13.7800  145.8300       6.0         3       914        97
VIS    2025250     20200   13.7700  145.8000       5.9         4       889        96
VIS    2025250     20200   13.7700  145.7800       5.6         4       889        98
VIS    2025250     20200   13.7800  145.7600       5.1         2       863        95
VIS    2025250     20200   13.7700  145.7300       5.3       360       886        98
VIS    2025250     20200   13.7800  145.7100       5.0       357       912        98
VIS    2025250     20200   13.7500  144.3400       4.1       325       824        99
VIS    2025250     20200   13.7500  143.4300       4.8       298       767        90
VIS    2025250     20200   13.7700  143.3400       5.4       285       796        94
VIS    2025250     20200   13.7700  143.3100       7.1       302       796        91
VIS    2025250     20200   13.7700  147.3600       7.3         7       950        92
VIS    2025250     20200   13.7600  147.0800       6.6         8       957        95
VIS    2025250     20200   13.7500  147.0400       6.8         8       940        93
VIS    2025250     20200   13.7400  146.4700       4.3        13       772        97
VIS    2025250     20200   13.7500  146.4600       4.2         6       772        98
VIS    2025250     20200   13.7600  145.7200       5.2       360       886        94
VIS    2025250     20200   13.7400  145.6900       4.9       359       918        91
VIS    2025250     20200   13.7500  145.5400       4.2         4       905        93
VIS    2025250     20200   13.7400  144.3400       4.3       331       824        97
VIS    2025250     20200   13.7400  144.3300       4.2       332       833        96
VIS    2025250     20200   13.7400  143.3400       4.6       291       891        96
VIS    2025250     20200   13.7300  147.1000       4.8        11       916        93
VIS    2025250     20200   13.7400  147.0700       6.2         8       940        95
VIS    2025250     20200   13.7400  147.0500       6.6         8       940        97
VIS    2025250     20200   13.7400  147.0300       6.2        12       940        92
VIS    2025250     20200   13.7400  146.4700       4.3        14       772        97
VIS    2025250     20200   13.7300  146.4700       4.0        14       773        98
VIS    2025250     20200   13.7200  145.6800       4.2         3       891        90
VIS    2025250     20200   13.7300  145.5400       5.0         4       943        97
VIS    2025250     20200   13.7200  145.5100       4.9         2       959        92
VIS    2025250     20200   13.7200  144.3400       4.3       327       849        97
VIS    2025250     20200   13.7200  144.3400       4.1       332       876        97
VIS    2025250     20200   13.7000  144.1900       4.5       325       858        91
VIS    2025250     20200   13.7100  144.1700       4.4       323       780        93
VIS    2025250     20200   13.7000  143.2300       7.6       299       825        90
VIS    2025250     20200   13.7200  143.1900       6.8       298       748        92
VIS    2025250     20200   13.7100  147.9200       4.7        41       953        95
VIS    2025250     20200   13.7100  147.9100       4.4        48       957        93
VIS    2025250     20200   13.7100  147.2800       7.4         1       917        90
VIS    2025250     20200   13.7000  147.2800       7.4         2       917        90
VIS    2025250     20200   13.7000  147.2400       6.7         9       917        96
VIS    2025250     20200   13.7100  147.1200       4.1        11       852        93
VIS    2025250     20200   13.7100  147.1100       4.3         9       852        93
VIS    2025250     20200   13.7200  147.0800       5.5         6       865        90
VIS    2025250     20200   13.7200  147.0300       6.1        12       937        97
VIS    2025250     20200   13.7000  145.5600       4.6         1       931        94
VIS    2025250     20200   13.6900  144.7200       4.3       326       770        95
VIS    2025250     20200   13.6900  144.1900       4.7       329       872        92
VIS    2025250     20200   13.6800  143.4500       4.4       300       767        98
VIS    2025250     20200   13.6900  143.4100       5.8       302       884        93
VIS    2025250     20200   13.6800  143.3900       4.1       305       883        93
VIS    2025250     20200   13.6900  143.2300       7.4       298       825        91
VIS    2025250     20200   13.6900  143.2100       6.8       295       843        91
VIS    2025250     20200   13.6900  147.2700       7.3         3       933        90
VIS    2025250     20200   13.6800  147.2600       7.2         6       922        94
VIS    2025250     20200   13.6900  147.2300       6.6         9       902        95
VIS    2025250     20200   13.6800  147.1300       4.5        16       838        93
VIS    2025250     20200   13.6700  147.1100       4.0        17       821        94
VIS    2025250     20200   13.6800  144.1800       4.2       323       872        94
VIS    2025250     20200   13.6700  144.1600       4.0       316       811        94
VIS    2025250     20200   13.6700  144.1500       4.0       308       811        95
VIS    2025250     20200   13.6600  143.4800       4.4       286       802        92
VIS    2025250     20200   13.6700  143.4500       4.3       302       790        97
VIS    2025250     20200   13.6700  143.4000       6.1       302       883        90
VIS    2025250     20200   13.6700  143.2000       6.4       288       847        94
VIS    2025250     20200   13.6700  147.2600       7.3         6       922        94
VIS    2025250     20200   13.6700  147.2500       7.3         7       917        94
VIS    2025250     20200   13.6700  147.2100       5.3        16       899        95
VIS    2025250     20200   13.6600  147.2000       4.6        29       875        90
VIS    2025250     20200   13.6600  147.1300       4.1        23       812        94
VIS    2025250     20200   13.6300  143.5400       4.1       278       814        96
VIS    2025250     20200   13.6400  143.4200       4.5       295       796        91
VIS    2025250     20200   13.6400  147.3800       7.7         4       954        92
VIS    2025250     20200   13.6400  147.2600       7.6         6       921        92
VIS    2025250     20200   13.6400  147.2400       7.0         9       909        94
VIS    2025250     20200   13.6300  147.2100       5.0        31       897        97
VIS    2025250     20200   13.6500  147.2000       4.6        35       875        93
VIS    2025250     20200   13.6300  146.9700       5.2        17       891        99
VIS    2025250     20200   13.6300  146.9000       4.9         8       981        94
VIS    2025250     20200   13.6400  146.5700       4.7         3       953        97
VIS    2025250     20200   13.6400  146.2700       5.8       360       918        97
VIS    2025250     20200   13.6300  146.2400       6.4        11       918        94
VIS    2025250     20200   13.6400  145.5600       4.8       359       902        92
VIS    2025250     20200   13.6400  145.5300       4.5         1       911        90
VIS    2025250     20200   13.6300  143.8200       4.8       294       833        95
VIS    2025250     20200   13.6100  143.5500       4.0       288       831        93
VIS    2025250     20200   13.6200  148.0800       6.9        13       980        92
VIS    2025250     20200   13.6200  147.3800       7.6         5       944        93
VIS    2025250     20200   13.6200  147.3600       7.1         5       953        95
VIS    2025250     20200   13.6100  147.3400       7.1         2       961        92
VIS    2025250     20200   13.6000  147.2400       6.8        10       937        94
VIS    2025250     20200   13.6200  147.2100       4.8        31       897        97
VIS    2025250     20200   13.5800  143.6300       4.7       288       746        92
VIS    2025250     20200   13.6000  143.6000       4.6       292       724        93
VIS    2025250     20200   13.6000  148.1900       4.2        26       975        91
VIS    2025250     20200   13.6000  148.1200       6.6         9       994        95
VIS    2025250     20200   13.6000  148.0800       7.1        20       980        98
VIS    2025250     20200   13.6000  147.3800       7.4         6       953        93
VIS    2025250     20200   13.5900  147.3100       7.2         8       957        95
VIS    2025250     20200   13.5900  147.3000       6.9        10       950        95
VIS    2025250     20200   13.5900  147.2800       6.7        13       948        96
VIS    2025250     20200   13.5800  147.2500       6.7         9       938        92
VIS    2025250     20200   13.5800  147.2300       6.1        11       939        92
VIS    2025250     20200   13.5900  146.9600       5.4        20       941        99
VIS    2025250     20200   13.5800  146.8400       4.5        20       909        95
VIS    2025250     20200   13.5600  143.6600       5.1       289       802        92
VIS    2025250     20200   13.5700  143.6200       5.1       290       785        98
VIS    2025250     20200   13.5700  143.5900       5.0       295       785        93
VIS    2025250     20200   13.5700  148.1100       5.4        14       985        97
VIS    2025250     20200   13.5800  148.0700       6.7        22       980        95
VIS    2025250     20200   13.5800  148.0600       7.0        24       980        96
VIS    2025250     20200   13.5800  147.3400       7.7         3       961        92
VIS    2025250     20200   13.5700  147.3100       7.4         6       961        93
VIS    2025250     20200   13.5600  147.2900       7.3        10       958        95
VIS    2025250     20200   13.5700  147.2700       7.1         9       942        97
VIS    2025250     20200   13.5700  147.2600       7.1         9       941        96
VIS    2025250     20200   13.5600  147.1300       6.2        10       916        96
VIS    2025250     20200   13.5500  146.8900       4.9        12       925        90
VIS    2025250     20200   13.5500  146.8600       4.1        13       891        92
VIS    2025250     20200   13.5700  146.8400       4.4        20       909        95
VIS    2025250     20200   13.5700  146.8300       4.3        19       909        94
VIS    2025250     20200   13.5600  146.5900       4.7        10       971        99
VIS    2025250     20200   13.5700  146.4100       4.2         8       943        95
VIS    2025250     20200   13.5400  143.7000       5.0       287       889        95
VIS    2025250     20200   13.5400  143.6900       5.5       284       889        90
VIS    2025250     20200   13.5400  143.6400       5.3       278       888        94
VIS    2025250     20200   13.5500  143.6200       4.9       283       795        98
VIS    2025250     20200   13.5500  143.5800       5.0       287       811        95
VIS    2025250     20200   13.5500  143.5700       4.7       286       811        92
VIS    2025250     20200   13.5400  143.4300       4.0       307       771        95
VIS    2025250     20200   13.5400  143.4200       4.2       296       760        93
VIS    2025250     20200   13.5300  143.2800       4.7       298       864        95
VIS    2025250     20200   13.5500  148.1000       5.8         9       985        96
VIS    2025250     20200   13.5500  147.2500       7.0         9       942        96
VIS    2025250     20200   13.5300  147.1500       6.2        12       893        91
VIS    2025250     20200   13.5500  147.1400       7.1         8       900        91
VIS    2025250     20200   13.5500  147.1200       6.9         6       917        95
VIS    2025250     20200   13.5300  147.0800       5.7        20       873        91
VIS    2025250     20200   13.5400  146.8900       5.5         8       891        93
VIS    2025250     20200   13.5400  146.8800       5.7         5       891        91
VIS    2025250     20200   13.5300  143.6500       5.7       279       888        95
VIS    2025250     20200   13.5300  143.6200       4.4       273       888        93
VIS    2025250     20200   13.5300  143.5700       4.5       289       847        95
VIS    2025250     20200   13.5200  143.5300       4.2       291       859        95
VIS    2025250     20200   13.5300  143.2900       4.2       294       877        95
VIS    2025250     20200   13.5300  148.0300       5.9        14       977        93
VIS    2025250     20200   13.5200  148.0100       5.5        12       969        92
VIS    2025250     20200   13.5200  147.8600       5.4        10       927        96
VIS    2025250     20200   13.5200  147.8600       5.6         8       923        96
VIS    2025250     20200   13.5100  147.8300       6.5         1       923        92
VIS    2025250     20200   13.5200  147.2900       6.7         3       964        94
VIS    2025250     20200   13.5100  147.2900       6.9         2       964        93
VIS    2025250     20200   13.5200  147.1600       6.2        12       882        91
VIS    2025250     20200   13.5100  147.1400       7.6         5       900        91
VIS    2025250     20200   13.5200  146.8700       6.7         2       921        93
VIS    2025250     20200   13.5100  146.8600       5.7         5       944        93
VIS    2025250     20200   13.5200  146.4900       4.4        16       943        98
VIS    2025250     20200   13.4900  143.7800       5.7       306       932        96
VIS    2025250     20200   13.4900  143.7400       6.3       312       932        96
VIS    2025250     20200   13.4900  143.3900       4.5       283       829        90
VIS    2025250     20200   13.4900  143.3900       4.5       282       829        91
VIS    2025250     20200   13.5100  148.0100       5.1        15       968        90
VIS    2025250     20200   13.5100  148.0000       4.9        17       964        94
VIS    2025250     20200   13.5100  147.9600       5.3        22       954        90
VIS    2025250     20200   13.5100  147.8600       4.8        13       923        96
VIS    2025250     20200   13.5000  147.8600       4.8        13       923        95
VIS    2025250     20200   13.5000  147.2800       7.0         0       958        92
VIS    2025250     20200   13.5000  147.2700       7.0         1       958        92
VIS    2025250     20200   13.4800  147.1300       8.2         3       915        90
VIS    2025250     20200   13.5000  147.1100       7.2        10       938        96
VIS    2025250     20200   13.5000  146.9900       4.1        24       811        90
VIS    2025250     20200   13.5000  146.8600       6.0         4       947        94
VIS    2025250     20200   13.4800  146.4800       5.4         5       955        98
VIS    2025250     20200   13.5000  146.4500       4.5        10       935        92
VIS    2025250     20200   13.4800  143.7800       4.5       315       943        94
VIS    2025250     20200   13.4800  143.7600       5.0       315       932        99
VIS    2025250     20200   13.4700  147.8400       4.8        12       864        93
VIS    2025250     20200   13.4900  147.8100       6.3         6       890        90
VIS    2025250     20200   13.4800  147.2800       7.2         2       956        93
VIS    2025250     20200   13.4700  147.2600       7.0         5       943        95
VIS    2025250     20200   13.4800  147.2500       6.8         6       943        93
VIS    2025250     20200   13.4700  147.1400       7.1         4       885        90
VIS    2025250     20200   13.4800  147.1300       7.7         3       909        91
VIS    2025250     20200   13.4800  146.8300       4.9        14       952        94
VIS    2025250     20200   13.4800  146.4900       6.0        10       959        95
VIS    2025250     20200   13.4500  148.1200       5.0        11       971        93
VIS    2025250     20200   13.4400  148.1100       4.9         9       938        95
VIS    2025250     20200   13.4600  148.0700       4.2        16       888        94
VIS    2025250     20200   13.4500  147.8500       4.0         8       862        93
VIS    2025250     20200   13.4400  147.8400       4.1         8       862        93
VIS    2025250     20200   13.4600  147.2700       7.3         5       943        94
VIS    2025250     20200   13.4500  147.2600       6.3         9       937        97
VIS    2025250     20200   13.4600  147.1600       4.9        14       819        92
VIS    2025250     20200   13.4400  146.8200       5.0         9       969        94
VIS    2025250     20200   13.4500  146.8000       4.5         9       958        93
VIS    2025250     20200   13.4300  148.1200       6.0        12       971        94
VIS    2025250     20200   13.4200  148.0800       5.6         6       871        91
VIS    2025250     20200   13.4300  147.7400       4.1        12       915        91
VIS    2025250     20200   13.4200  147.6900       4.5        14       894        94
VIS    2025250     20200   13.4200  147.6900       4.5        11       880        92
VIS    2025250     20200   13.4200  147.6600       4.1        13       896        90
VIS    2025250     20200   13.4200  147.2800       8.2         4       953        93
VIS    2025250     20200   13.4200  147.0700       4.3        22       878        92
VIS    2025250     20200   13.4200  147.0600       4.3        22       878        92
VIS    2025250     20200   13.4100  146.6600       5.3        30       969        96
VIS    2025250     20200   13.4200  145.8500       4.1       350       775        95
VIS    2025250     20200   13.4100  143.3300       4.9       279       855        94
VIS    2025250     20200   13.3800  140.8100      10.4       219       919        93
VIS    2025250     20200   13.3900  140.7900      10.2       221       891        95
VIS    2025250     20200   13.4000  140.7800       9.9       217       842        94
VIS    2025250     20200   13.4100  148.1000       6.0        11       936        94
VIS    2025250     20200   13.4000  148.0900       5.3        12       913        95
VIS    2025250     20200   13.3900  147.7200       5.5         8       901        95
VIS    2025250     20200   13.4000  147.7000       5.2        12       894        97
VIS    2025250     20200   13.4100  147.6800       4.3        15       872        91
VIS    2025250     20200   13.4100  147.6500       4.3        17       907        93
VIS    2025250     20200   13.4100  147.2000       4.2        22       791        91
VIS    2025250     20200   13.4000  147.0800       5.6        17       904       100
VIS    2025250     20200   13.4100  146.6600       5.4        29       936        90
VIS    2025250     20200   13.3800  140.7900      10.1       222       935        97
VIS    2025250     20200   13.3800  140.7700       9.5       223       891        97
VIS    2025250     20200   13.3900  148.1100       4.7        13       984        94
VIS    2025250     20200   13.3900  147.7200       5.7         8       914        92
VIS    2025250     20200   13.3800  147.6800       5.0        12       889        95
VIS    2025250     20200   13.3700  147.6700       5.0         9       889        93
VIS    2025250     20200   13.3700  147.2500       5.7        19       908        96
VIS    2025250     20200   13.3800  147.0300       6.1        23       957        91
VIS    2025250     20200   13.3500  143.2600       5.6       306       909        97
VIS    2025250     20200   13.3500  140.8100      10.0       220       939        91
VIS    2025250     20200   13.3500  140.8000      10.1       221       939        94
VIS    2025250     20200   13.3700  147.8200       4.1         7       884        93
VIS    2025250     20200   13.3700  147.8000       4.7         6       872        93
VIS    2025250     20200   13.3600  147.7900       4.6         5       872        93
VIS    2025250     20200   13.3600  147.6800       5.4        10       903        92
VIS    2025250     20200   13.3600  147.6700       5.2         9       915        94
VIS    2025250     20200   13.3400  147.2500       7.9         8       908        90
VIS    2025250     20200   13.3600  147.2400       6.1        18       865        91
VIS    2025250     20200   13.3400  143.3000       5.6       307       952        94
VIS    2025250     20200   13.3300  143.2900       6.6       308       939        92
VIS    2025250     20200   13.3400  147.7800       4.0         1       905        91
VIS    2025250     20200   13.3400  147.6700       5.7         6       917        96
VIS    2025250     20200   13.3400  147.6700       5.5         6       923        95
VIS    2025250     20200   13.3200  147.6400       6.1         2       942        90
VIS    2025250     20200   13.3200  147.1100       5.9        19       894        93
VIS    2025250     20200   13.3000  148.1400       5.1         7       979        93
VIS    2025250     20200   13.3200  147.6800       6.0         7       955        95
VIS    2025250     20200   13.3200  147.6600       6.2         3       948        93
VIS    2025250     20200   13.3000  147.6000       6.2         4       978        92
VIS    2025250     20200   13.3000  147.5000       7.4         3       980        93
VIS    2025250     20200   13.3100  147.1300       5.4        16       855        90
VIS    2025250     20200   13.3100  147.1000       5.8        17       913        98
VIS    2025250     20200   13.2900  147.0700       4.2        17       935        91
VIS    2025250     20200   13.3000  148.1400       4.9         7       979        93
VIS    2025250     20200   13.2900  147.6100       6.3         2       978        93
VIS    2025250     20200   13.2900  147.5800       5.2         7       975        90
VIS    2025250     20200   13.2800  147.4700       6.8         2       972        92
VIS    2025250     20200   13.2900  147.0800       4.8        12       937        97
VIS    2025250     20200   13.2900  147.0800       4.2        14       937        95
VIS    2025250     20200   13.2700  146.9200       4.1        10       958        93
VIS    2025250     20200   13.2700  146.8700       4.7        11       969        90
VIS    2025250     20200   13.2800  145.9900       4.0        11       846        91
VIS    2025250     20200   13.2800  145.9900       4.0         9       846        92
VIS    2025250     20200   13.2700  147.4900       7.1         2       977        93
VIS    2025250     20200   13.2500  147.4600       5.4         4       960        92
VIS    2025250     20200   13.2500  147.4200       5.4        12       946        90
VIS    2025250     20200   13.2600  147.1000       4.3         7       895        90
VIS    2025250     20200   13.2600  147.0900       4.0         9       923        92
VIS    2025250     20200   13.2700  146.8800       4.8        11       969        92
VIS    2025250     20200   13.2400  147.4400       5.4         8       953        92
VIS    2025250     20200   13.2200  147.1500       4.4         1       851        96
VIS    2025250     20200   13.2100  148.1900       6.6        17       988        94
VIS    2025250     20200   13.2100  147.1800       5.7        15       850        92
VIS    2025250     20200   13.2000  147.1600       4.1         5       836        93
VIS    2025250     20200   13.2200  146.5300       4.2         7       896        97
VIS    2025250     20200   13.2000  147.1600       4.3         9       836        92
VIS    2025250     20200   13.1700  146.7000       4.9        13       895        94
VIS    2025250     20200   13.1500  147.2300       5.1         8       817        91
VIS    2025250     20200   13.1700  147.2000       5.4        12       830        90
VIS    2025250     20200   13.1600  147.1900       4.2         7       816        94
VIS    2025250     20200   13.1700  146.7400       4.4        12       888        91
VIS    2025250     20200   13.1500  146.7200       5.3         8       862        95
VIS    2025250     20200   13.1600  146.6900       4.8        12       882        96
VIS    2025250     20200   13.1700  146.6600       4.5        11       840        94
VIS    2025250     20200   13.1500  147.2300       5.0         8       815        90
VIS    2025250     20200   13.1400  146.7100       5.1        10       820        90
VIS    2025250     20200   13.1200  146.3700       4.1        20       891        93
VIS    2025250     20200   13.1200  146.3600       4.1        21       891        92
VIS    2025250     20200   13.1000  146.7000       5.4        16       845        90
VIS    2025250     20200   13.0900  146.3500       4.7        13       908        96
VIS    2025250     20200   13.0700  147.1800       4.0         1       827        92
VIS    2025250     20200   13.0400  147.1200       4.0         1       885        91
VIS    2025250     20200   13.0300  147.1000       4.4         7       886        91
VIS    2025250     20200   13.0200  148.0400       6.2        11       981        90
VIS    2025250     20200   13.0200  147.1900       4.1         6       848        91
VIS    2025250     20200   13.0200  146.6900       4.6        14       805        90
VIS    2025250     20200   13.0100  148.0400       6.3        14       981        96
VIS    2025250     20200   13.0100  147.1700       4.5         2       894        95
VIS    2025250     20200   13.0000  147.1400       4.2       358       885        96
VIS    2025250     20200   12.9800  147.3300       4.0        18       857        90
VIS    2025250     20200   12.9700  147.2000       4.3       359       854        92
VIS    2025250     20200   12.9700  147.1500       5.4       359       918        97
VIS    2025250     20200   12.9700  148.0300       7.4        14       980        95
VIS    2025250     20200   12.9600  147.3100       4.0        18       847        91
VIS    2025250     20200   12.9600  146.9200       4.1        16       836        97
VIS    2025250     20200   12.9200  147.5200       4.2        15       821        90
VIS    2025250     20200   12.8900  146.9100       4.6        14       853        90
VIS    2025250     20200   12.8900  146.9000       4.8        22       842        90
VIS    2025250     20200   12.9100  146.8700       4.6        21       829        90
VIS    2025250     20200   12.8900  146.8300       5.5        14       919        92
VIS    2025250     20200   12.9100  146.7600       5.7         8       943        97
VIS    2025250     20200   12.8800  147.4700       4.2        26       854        95
VIS    2025250     20200   12.8700  146.9800       4.3        16       828        96
VIS    2025250     20200   12.8800  146.9600       4.4        13       865        99
VIS    2025250     20200   12.8800  146.9200       4.0         6       853        94
VIS    2025250     20200   12.8800  146.9200       4.0         6       853        91
VIS    2025250     20200   12.8700  146.8000       6.0         8       940        92
VIS    2025250     20200   12.8800  146.7300       4.7        17       886        93
VIS    2025250     20200   12.8800  146.7300       4.7        11       886        91
VIS    2025250     20200   12.8600  147.4500       4.0        21       877        90
VIS    2025250     20200   12.8500  147.4200       4.5         8       870        95
VIS    2025250     20200   12.8500  147.4100       4.3        12       870        96
VIS    2025250     20200   12.8600  146.9200       4.1         4       841        92
VIS    2025250     20200   12.8600  146.8200       4.7         9       919        95
VIS    2025250     20200   12.8400  146.7200       6.8       358       886        91
VIS    2025250     20200   12.8300  147.4800       4.3        34       840        94
VIS    2025250     20200   12.8400  147.4500       4.5        19       873        98
VIS    2025250     20200   12.8400  147.4400       4.8        16       876        97
VIS    2025250     20200   12.8400  147.4100       4.2        15       873        97
VIS    2025250     20200   12.8300  147.4000       4.3        20       876        95
VIS    2025250     20200   12.8300  147.3600       5.5        11       885        93
VIS    2025250     20200   12.8200  147.3400       5.5         4       885        92
VIS    2025250     20200   12.8300  146.9500       5.0         5       866        91
VIS    2025250     20200   12.8300  146.5100       4.4        15       801        90
VIS    2025250     20200   12.8000  147.4800       4.1        21       840        92
VIS    2025250     20200   12.8100  147.4700       4.6        20       860        91
VIS    2025250     20200   12.8100  147.4400       4.7        20       870        94
VIS    2025250     20200   12.8000  147.4100       4.0        30       863        95
VIS    2025250     20200   12.8200  147.0000       4.2        19       865        95
VIS    2025250     20200   12.8200  146.9800       4.2        14       866        93
VIS    2025250     20200   12.8200  146.9400       4.7        11       866        90
VIS    2025250     20200   12.8000  146.9300       4.4        24       866        91
VIS    2025250     20200   12.8000  146.6900       4.7       357       835        97
VIS    2025250     20200   12.8100  146.6700       4.3         4       819        93
VIS    2025250     20200   12.7900  146.6100       4.3        13       812        92
VIS    2025250     20200   12.7900  147.9100       7.0         4       977        93
VIS    2025250     20200   12.7900  147.8700       6.5         5       961        94
VIS    2025250     20200   12.7900  147.6200       7.2         5       961        95
VIS    2025250     20200   12.8000  147.5800       4.3        34       898        95
VIS    2025250     20200   12.7900  147.5700       4.1        43       859        95
VIS    2025250     20200   12.7900  147.4700       4.1        19       842        95
VIS    2025250     20200   12.7800  147.4500       4.1        22       857        92
VIS    2025250     20200   12.8000  147.4100       4.1        26       863        97
VIS    2025250     20200   12.7800  147.0100       4.6        22       891        94
VIS    2025250     20200   12.7900  146.9900       4.9        16       892        91
VIS    2025250     20200   12.7900  146.9700       4.2        10       892        93
VIS    2025250     20200   12.7800  146.7300       5.8       358       842        91
VIS    2025250     20200   12.7800  146.7100       5.7       355       835        92
VIS    2025250     20200   12.7800  146.6900       4.9       355       833        96
VIS    2025250     20200   12.7900  146.6200       4.3        13       813        92
VIS    2025250     20200   12.7600  147.8800       6.0         4       966        95
VIS    2025250     20200   12.7600  147.8800       6.0         4       961        95
VIS    2025250     20200   12.7600  147.8000       5.1         7       944        95
VIS    2025250     20200   12.7700  147.6100       5.1        16       961        97
VIS    2025250     20200   12.7600  147.4600       4.1        11       844        90
VIS    2025250     20200   12.7600  147.2300       4.4         0       882        93
VIS    2025250     20200   12.7500  146.8400       5.2         3       913        97
VIS    2025250     20200   12.7500  146.7000       4.8         1       828        95
VIS    2025250     20200   12.7600  146.6700       4.0         3       812        94
VIS    2025250     20200   12.7500  147.9100       5.8         6       971        90
VIS    2025250     20200   12.7300  147.2300       4.6         2       865        91
VIS    2025250     20200   12.7300  146.8300       5.0         5       913        92
VIS    2025250     20200   12.7400  146.7100       4.6         2       833        94
VIS    2025250     20200   12.7100  147.9300       5.4         7       971        93
VIS    2025250     20200   12.7200  147.9200       5.2         8       971        91
VIS    2025250     20200   12.7200  147.2300       4.4         5       830        91
VIS    2025250     20200   12.7100  147.2200       4.5         7       830        91
VIS    2025250     20200   12.7000  147.5100       4.4        30       907        92
VIS    2025250     20200   12.6400  141.7400      12.3        53       184        90
VIS    2025250     20200   12.6400  147.7400       4.4         3       932        96
VIS    2025250     20200   12.6300  146.4800       5.4       356       833        91
VIS    2025250     20200   12.6200  147.9100       6.2         6       949        93
VIS    2025250     20200   12.6300  147.7300       4.6         5       932        94
VIS    2025250     20200   12.6100  146.5900       4.2         1       801        93
VIS    2025250     20200   12.6200  146.4700       5.2       357       860        95
VIS    2025250     20200   12.6100  148.0600       6.6         6       975        91
VIS    2025250     20200   12.6100  147.9000       6.2         6       931        91
VIS    2025250     20200   12.6000  146.6100       4.2         7       809        95
VIS    2025250     20200   12.6000  146.6000       4.3         3       809        94
VIS    2025250     20200   12.6000  146.5100       4.2         5       844        98
VIS    2025250     20200   12.5600  141.6000      10.1        50       180        90
VIS    2025250     20200   12.5900  147.8800       4.7         8       920        91
VIS    2025250     20200   12.5500  141.6200       9.5        32       180        98
VIS    2025250     20200   12.5300  141.5700      10.0        54       180        90
VIS    2025250     20200   12.5500  141.4700       7.6        52       186        92
VIS    2025250     20200   12.5400  146.5000       4.4       360       957        93
VIS    2025250     20200   12.5100  141.6000      11.5        54       179        91
VIS    2025250     20200   12.5200  141.5700      10.7        56       183        91
VIS    2025250     20200   12.5200  141.5300       8.1        45       182        90
VIS    2025250     20200   12.5100  141.5100      10.0        40       177        95
VIS    2025250     20200   12.5200  141.4800      11.9        47       177        91
VIS    2025250     20200   12.5300  147.9700       6.3        13       970        95
VIS    2025250     20200   12.5100  141.6400      12.9        54       179        90
VIS    2025250     20200   12.4900  141.6100      11.7        49       179        93
VIS    2025250     20200   12.4900  141.6000      11.5        52       180        90
VIS    2025250     20200   12.4900  141.5300      10.0        44       177        93
VIS    2025250     20200   12.5100  141.5100       9.6        41       177        95
VIS    2025250     20200   12.4900  141.4100      10.6        54       175        90
VIS    2025250     20200   12.5200  147.8800       5.0         7       941        90
VIS    2025250     20200   12.5100  147.2700       4.1        12       870        95
VIS    2025250     20200   12.4800  141.6000      11.1        51       180        92
VIS    2025250     20200   12.4700  141.5100      11.0        45       189        90
VIS    2025250     20200   12.4800  141.4100      10.7        56       175        90
VIS    2025250     20200   12.4800  147.8700       6.0         6       948        90
VIS    2025250     20200   12.4900  147.3200       4.1         2       914        97
VIS    2025250     20200   12.4400  142.2500       5.8       271       960        91
VIS    2025250     20200   12.4400  141.4900      11.0        44       184        95
VIS    2025250     20200   12.4400  141.4600      10.2        43       192        94
VIS    2025250     20200   12.4500  147.9000       6.3         3       974        92
VIS    2025250     20200   12.4500  147.8400       6.2         5       918        91
VIS    2025250     20200   12.4600  147.5900       5.9         6       907        91
VIS    2025250     20200   12.4600  147.5800       5.8         4       907        92
VIS    2025250     20200   12.4600  147.3800       4.7       358       916        95
VIS    2025250     20200   12.4200  142.2900       6.6       278       990        90
VIS    2025250     20200   12.4200  142.2600       6.4       274       982        91
VIS    2025250     20200   12.4300  141.5900       8.5        37       182        91
VIS    2025250     20200   12.4400  141.4900      11.1        45       180        95
VIS    2025250     20200   12.4400  147.8400       6.4         4       939        92
VIS    2025250     20200   12.4400  147.8300       6.3         4       918        90
VIS    2025250     20200   12.4200  147.6100       5.5        10       902        94
VIS    2025250     20200   12.4400  147.5800       5.4         7       907        93
VIS    2025250     20200   12.4400  147.5600       5.3       358       897        90
VIS    2025250     20200   12.4300  147.5400       4.9       357       885        91
VIS    2025250     20200   12.4300  147.5000       4.3         3       856        91
VIS    2025250     20200   12.4200  147.4700       4.1         1       893        96
VIS    2025250     20200   12.4400  147.4500       4.1         4       903        93
VIS    2025250     20200   12.4100  142.2500       5.9       275       980        91
VIS    2025250     20200   12.3900  140.3200       8.3       223       780        92
VIS    2025250     20200   12.3900  140.3100       8.2       222       790        93
VIS    2025250     20200   12.4200  147.8600       6.5         4       970        92
VIS    2025250     20200   12.4200  147.8200       6.4       360       918        90
VIS    2025250     20200   12.4000  147.7000       4.5         3       812        90
VIS    2025250     20200   12.4100  147.6100       5.3         9       891        92
VIS    2025250     20200   12.4200  147.5900       5.0        12       891        96
VIS    2025250     20200   12.4000  147.5800       4.1        12       857        93
VIS    2025250     20200   12.4100  147.5600       4.4         5       891        94
VIS    2025250     20200   12.3700  140.3600       8.5       235       793        91
VIS    2025250     20200   12.3900  140.3200       8.8       225       790        91
VIS    2025250     20200   12.3800  140.2800       8.4       220       815        90
VIS    2025250     20200   12.3900  140.2500       7.4       221       833        91
VIS    2025250     20200   12.3900  147.6900       4.8         3       896        95
VIS    2025250     20200   12.3700  146.6500       4.2       358       923       100
VIS    2025250     20200   12.3800  146.6400       4.3       359       935        98
VIS    2025250     20200   12.3700  142.0700      12.3        45       192        90
VIS    2025250     20200   12.3600  140.4000       7.1       226       730        90
VIS    2025250     20200   12.3400  140.3100       7.9       230       841        97
VIS    2025250     20200   12.3500  140.2400       6.9       219       830        97
VIS    2025250     20200   12.3500  140.2400       7.0       220       833        96
VIS    2025250     20200   12.3700  147.6900       5.0         5       925        98
VIS    2025250     20200   12.3500  147.6700       4.2        10       893        98
VIS    2025250     20200   12.3500  147.6600       4.3         9       878        97
VIS    2025250     20200   12.3700  146.6700       4.0         0       923        94
VIS    2025250     20200   12.3700  146.6500       4.3       358       923       100
VIS    2025250     20200   12.3500  146.6200       4.2         7       953        94
VIS    2025250     20200   12.3600  146.6100       5.0         2       953        90
VIS    2025250     20200   12.3300  142.3800       6.0       281       954        90
VIS    2025250     20200   12.3400  142.3600       6.3       281       965        90
VIS    2025250     20200   12.3200  140.3700       8.8       224       834        90
VIS    2025250     20200   12.3300  140.2600       5.8       229       834        92
VIS    2025250     20200   12.3400  140.2500       6.4       219       833        94
VIS    2025250     20200   12.3300  140.2200       6.0       219       810        90
VIS    2025250     20200   12.3400  147.7000       5.6         9       969        97
VIS    2025250     20200   12.3400  147.6700       4.0        14       893        98
VIS    2025250     20200   12.3400  147.6500       4.1        10       878        98
VIS    2025250     20200   12.3400  146.6200       4.1        10       953        93
VIS    2025250     20200   12.3400  146.6200       4.2        11       953        93
VIS    2025250     20200   12.3200  142.3700       6.6       276       969        91
VIS    2025250     20200   12.3200  142.3500       6.4       277       969        91
VIS    2025250     20200   12.3100  141.6900      11.8        45       176        92
VIS    2025250     20200   12.3100  140.3000       7.3       233       880        94
VIS    2025250     20200   12.3000  140.2700       6.2       233       834        95
VIS    2025250     20200   12.3000  140.2400       4.6       223       786        94
VIS    2025250     20200   12.3000  140.2300       4.8       219       786        93
VIS    2025250     20200   12.3300  147.7000       5.4         6       969        98
VIS    2025250     20200   12.3100  146.8900       4.1         3       856        92
VIS    2025250     20200   12.2800  142.4000       6.5       265       974        91
VIS    2025250     20200   12.2800  142.3900       6.7       265       974        93
VIS    2025250     20200   12.2900  140.3400       5.7       243       841        94
VIS    2025250     20200   12.2900  140.3300       5.2       245       856        90
VIS    2025250     20200   12.2800  140.2700       6.3       227       836        93
VIS    2025250     20200   12.2700  140.2700       5.5       229       834        94
VIS    2025250     20200   12.2900  140.2400       4.9       230       806        90
VIS    2025250     20200   12.2600  142.4200       6.7       267       974        91
VIS    2025250     20200   12.2700  142.4000       6.5       265       974        91
VIS    2025250     20200   12.2700  142.3900       6.5       265       974        91
VIS    2025250     20200   12.2700  142.0000      14.3        36       183        92
VIS    2025250     20200   12.2700  140.2800       6.3       223       878        92
VIS    2025250     20200   12.2700  140.2300       4.8       226       806        93
VIS    2025250     20200   12.2500  142.0000      14.1        47       183        92
VIS    2025250     20200   12.2500  141.9800      12.7        50       183        94
VIS    2025250     20200   12.2300  140.2800       5.5       215       899        90
VIS    2025250     20200   12.2400  140.2600       4.3       211       862        91
VIS    2025250     20200   12.2300  140.2300       4.9       222       832        95
VIS    2025250     20200   12.2200  141.9700      12.9        49       187        95
VIS    2025250     20200   12.2100  141.9700      12.9        49       187        95
VIS    2025250     20200   12.2100  141.9400      13.2        51       184        91
OIR    2025250     20200   17.2800  142.1400      12.0        97       140        60
OIR    2025250     20200   17.2800  142.1200      12.0        98       140        60
OIR    2025250     20200   17.2800  142.1000      12.0        98       140        60
OIR    2025250     20200   17.2600  142.2600      11.8        90       140        60
OIR    2025250     20200   17.2600  142.2200      11.8        92       140        60
OIR    2025250     20200   17.2600  142.2000      11.8        94       140        60
OIR    2025250     20200   17.2600  142.1800      11.8        95       140        60
OIR    2025250     20200   17.2600  142.1600      11.8        96       140        60
OIR    2025250     20200   17.2600  142.1400      11.8        97       136        60
OIR    2025250     20200   17.2600  142.1200      11.8        97       136        60
OIR    2025250     20200   17.2600  142.1000      11.9        98       136        60
OIR    2025250     20200   17.2600  142.0800      11.9        98       136        60
OIR    2025250     20200   17.2600  142.0600      11.9        99       140        60
OIR    2025250     20200   17.2600  142.0400      11.9       100       140        60
OIR    2025250     20200   17.2600  142.0200      11.8       101       140        60
OIR    2025250     20200   17.2600  141.9600      11.8       105       140        60
OIR    2025250     20200   17.2600  141.9400      11.9       108       144        60
OIR    2025250     20200   17.2400  142.3000      11.8        89       140        60
OIR    2025250     20200   17.2400  142.2800      11.7        89       140        60
OIR    2025250     20200   17.2400  142.2600      11.6        90       136        60
OIR    2025250     20200   17.2400  142.2400      11.6        90       136        60
OIR    2025250     20200   17.2400  142.2200      11.5        91       136        60
OIR    2025250     20200   17.2400  142.2000      11.5        92       136        60
OIR    2025250     20200   17.2400  142.1800      11.5        93       136        60
OIR    2025250     20200   17.2400  142.1600      11.6        95       132        60
OIR    2025250     20200   17.2400  142.1400      11.6        96       132        60
OIR    2025250     20200   17.2400  142.1200      11.7        96       136        60
OIR    2025250     20200   17.2400  142.0800      11.7        98       132        60
OIR    2025250     20200   17.2400  142.0600      11.7        99       132        60
OIR    2025250     20200   17.2400  142.0200      11.7       101       136        60
OIR    2025250     20200   17.2400  142.0000      11.7       102       136        60
OIR    2025250     20200   17.2400  141.9600      11.7       105       136        60
OIR    2025250     20200   17.2400  141.8400      12.0       115       140        60
OIR    2025250     20200   17.2400  141.8200      12.1       116       140        60
OIR    2025250     20200   17.2400  141.8000      12.2       117       144        60
OIR    2025250     20200   17.2400  141.7800      12.4       118       140        60
OIR    2025250     20200   17.2200  142.3400      11.7        87       140        60
OIR    2025250     20200   17.2200  142.3200      11.6        88       140        60
OIR    2025250     20200   17.2200  142.3000      11.6        88       136        60
OIR    2025250     20200   17.2200  142.2800      11.5        89       136        60
OIR    2025250     20200   17.2200  142.2600      11.4        89       132        60
OIR    2025250     20200   17.2200  142.2400      11.4        90       132        60
OIR    2025250     20200   17.2200  142.2200      11.4        91       132        60
OIR    2025250     20200   17.2200  142.2000      11.4        91       132        60
OIR    2025250     20200   17.2200  142.1800      11.4        92       140        60
OIR    2025250     20200   17.2200  142.1600      11.4        93       132        60
OIR    2025250     20200   17.2200  142.1400      11.4        95       140        60
OIR    2025250     20200   17.2200  142.1200      11.5        96       140        60
OIR    2025250     20200   17.2200  142.1000      11.5        97       136        60
OIR    2025250     20200   17.2200  142.0800      11.5        98       132        60
OIR    2025250     20200   17.2200  142.0600      11.5        98       132        60
OIR    2025250     20200   17.2200  142.0400      11.5        99       140        60
OIR    2025250     20200   17.2200  142.0200      11.5       101       140        60
OIR    2025250     20200   17.2200  141.9600      11.5       105       136        60
OIR    2025250     20200   17.2200  141.9400      11.5       107       136        60
OIR    2025250     20200   17.2200  141.8800      11.7       112       132        60
OIR    2025250     20200   17.2200  141.8600      11.8       114       136        60
OIR    2025250     20200   17.2200  141.8400      11.9       115       136        60
OIR    2025250     20200   17.2200  141.7800      12.2       117       136        60
OIR    2025250     20200   17.2200  141.7600      12.3       118       140        60
OIR    2025250     20200   17.2200  141.7200      12.5       118       140        60
OIR    2025250     20200   17.2000  142.3800      11.8        86       140        60
OIR    2025250     20200   17.2000  142.3600      11.6        86       140        60
OIR    2025250     20200   17.2000  142.3400      11.5        87       140        60
OIR    2025250     20200   17.2000  142.3200      11.4        87       132        60
OIR    2025250     20200   17.2000  141.6800      12.5       119       140        60
OIR    2025250     20200   17.2000  141.6600      12.5       119       140        60
OIR    2025250     20200   17.2000  141.6400      12.6       120       144        60
OIR    2025250     20200   17.1800  142.3600      11.3        86       136        60
OIR    2025250     20200   17.1800  142.3400      11.2        86       136        60
OIR    2025250     20200   17.1800  141.7200      12.2       119       136        60
OIR    2025250     20200   17.1800  141.7000      12.3       119       136        60
OIR    2025250     20200   17.1800  141.6800      12.4       120       136        60
OIR    2025250     20200   17.1800  141.6600      12.4       120       136        60
OIR    2025250     20200   17.1800  141.6400      12.5       122       140        60
OIR    2025250     20200   17.1600  142.4600      11.1        83       140        60
OIR    2025250     20200   17.1600  142.4400      11.3        85       140        60
OIR    2025250     20200   17.1600  142.4200      11.4        85       140        60
OIR    2025250     20200   17.1600  142.4000      11.3        85       140        60
OIR    2025250     20200   17.1600  142.3800      11.2        85       136        60
OIR    2025250     20200   17.1600  142.3600      11.1        85       140        60
OIR    2025250     20200   17.1600  141.7200      12.1       119       144        60
OIR    2025250     20200   17.1600  141.6800      12.2       121       144        60
OIR    2025250     20200   17.1600  141.6600      12.3       122       136        60
OIR    2025250     20200   17.1600  141.6400      12.3       123       140        60
OIR    2025250     20200   17.1600  141.6200      12.4       126       140        60
OIR    2025250     20200   17.1600  141.6000      12.6       130       144        60
OIR    2025250     20200   17.1400  142.5000      10.7        79       140        60
OIR    2025250     20200   17.1400  142.4600      10.7        81       136        60
OIR    2025250     20200   17.1400  142.4400      10.7        82       140        60
OIR    2025250     20200   17.1400  142.4200      10.8        83       136        60
OIR    2025250     20200   17.1400  142.4000      10.9        83       136        60
OIR    2025250     20200   17.1400  141.7200      11.9       121       140        60
OIR    2025250     20200   17.1400  141.7000      12.0       122       140        60
OIR    2025250     20200   17.1400  141.6800      12.0       123       140        60
OIR    2025250     20200   17.1400  141.6600      12.1       125       144        60
OIR    2025250     20200   17.1400  141.6400      12.1       127       136        60
OIR    2025250     20200   17.1400  141.6200      12.2       129       140        60
OIR    2025250     20200   17.1400  141.6000      12.4       132       140        60
OIR    2025250     20200   17.1400  141.5800      12.6       133       140        60
OIR    2025250     20200   17.1400  141.5600      12.7       134       144        60
OIR    2025250     20200   17.1200  142.4800      10.5        79       140        60
OIR    2025250     20200   17.1200  142.4600      10.5        80       136        60
OIR    2025250     20200   17.1200  142.4400      10.5        80       136        60
OIR    2025250     20200   17.1200  141.7200      11.7       122       144        60
OIR    2025250     20200   17.1200  141.7000      11.8       124       140        60
OIR    2025250     20200   17.1200  141.6800      11.8       126       140        60
OIR    2025250     20200   17.1200  141.6600      11.8       129       140        60
OIR    2025250     20200   17.1200  141.6400      11.9       130       132        60
OIR    2025250     20200   17.1200  141.6000      12.2       133       136        60
OIR    2025250     20200   17.1200  141.5600      12.6       136       136        60
OIR    2025250     20200   17.1200  141.5200      12.9       138       140        60
OIR    2025250     20200   17.1200  141.5000      12.9       139       144        60
OIR    2025250     20200   17.1000  142.6000      10.9        75       140        60
OIR    2025250     20200   17.1000  142.5600      10.8        77       140        60
OIR    2025250     20200   17.1000  142.5400      10.7        77       140        60
OIR    2025250     20200   17.1000  142.5200      10.6        78       140        60
OIR    2025250     20200   17.1000  142.5000      10.5        78       140        60
OIR    2025250     20200   17.1000  142.4800      10.4        78       140        60
OIR    2025250     20200   17.1000  142.4600      10.4        79       136        60
OIR    2025250     20200   17.1000  141.7000      11.5       128       140        60
OIR    2025250     20200   17.1000  141.6800      11.6       131       140        60
OIR    2025250     20200   17.1000  141.6600      11.6       132       144        60
OIR    2025250     20200   17.1000  141.6400      11.8       134       140        60
OIR    2025250     20200   17.1000  141.6200      11.9       135       132        60
OIR    2025250     20200   17.1000  141.5800      12.3       137       132        60
OIR    2025250     20200   17.1000  141.5600      12.5       138       136        60
OIR    2025250     20200   17.1000  141.5400      12.7       139       136        60
OIR    2025250     20200   17.1000  141.5200      12.8       139       136        60
OIR    2025250     20200   17.1000  141.5000      12.9       139       140        60
OIR    2025250     20200   17.0800  142.5400      10.5        77       140        60
OIR    2025250     20200   17.0800  142.5200      10.5        77       136        60
OIR    2025250     20200   17.0800  142.4800      10.4        78       140        60
OIR    2025250     20200   17.0800  141.6800      11.3       134       140        60
OIR    2025250     20200   17.0800  141.6600      11.5       135       144        60
OIR    2025250     20200   17.0800  141.6400      11.6       136       144        60
OIR    2025250     20200   17.0800  141.6200      11.8       137       140        60
OIR    2025250     20200   17.0800  141.6000      12.0       138       140        60
OIR    2025250     20200   17.0800  141.5800      12.2       139       132        60
OIR    2025250     20200   17.0800  141.5600      12.5       139       144        60
OIR    2025250     20200   17.0800  141.5400      12.7       140       132        60
OIR    2025250     20200   17.0800  141.5200      12.8       140       136        60
OIR    2025250     20200   17.0800  141.5000      12.9       140       140        60
OIR    2025250     20200   17.0800  141.4800      13.0       140       140        60
OIR    2025250     20200   17.0800  141.4600      13.0       140       140        60
OIR    2025250     20200   17.0600  142.6200      10.6        73       140        60
OIR    2025250     20200   17.0600  142.5800      10.5        74       140        60
OIR    2025250     20200   17.0600  142.5200      10.3        76       140        60
OIR    2025250     20200   17.0600  141.6800      11.1       137       140        60
OIR    2025250     20200   17.0600  141.6600      11.3       138       140        60
OIR    2025250     20200   17.0600  141.6400      11.4       138       144        60
OIR    2025250     20200   17.0600  141.6200      11.6       139       144        60
OIR    2025250     20200   17.0600  141.6000      11.9       139       144        60
OIR    2025250     20200   17.0600  141.5800      12.1       140       140        60
OIR    2025250     20200   17.0600  141.5600      12.4       140       140        60
OIR    2025250     20200   17.0600  141.5400      12.6       140       132        60
OIR    2025250     20200   17.0600  141.5200      12.7       140       132        60
OIR    2025250     20200   17.0600  141.5000      12.8       141       136        60
OIR    2025250     20200   17.0600  141.4800      12.9       141       136        60
OIR    2025250     20200   17.0600  141.4600      13.0       141       140        60
OIR    2025250     20200   17.0400  142.6400      10.6        73       140        60
OIR    2025250     20200   17.0400  142.6200      10.5        73       140        60
OIR    2025250     20200   17.0400  142.6000      10.4        73       136        60
OIR    2025250     20200   17.0400  142.5600      10.3        75       136        60
OIR    2025250     20200   17.0400  141.6600      11.1       139       140        60
OIR    2025250     20200   17.0400  141.6400      11.3       139       136        60
OIR    2025250     20200   17.0400  141.6200      11.4       140       136        60
OIR    2025250     20200   17.0400  141.6000      11.7       140       128        60
OIR    2025250     20200   17.0400  141.5800      12.0       141       136        60
OIR    2025250     20200   17.0400  141.5600      12.2       141       140        60
OIR    2025250     20200   17.0400  141.5400      12.5       141       132        60
OIR    2025250     20200   17.0400  141.5200      12.6       141       140        60
OIR    2025250     20200   17.0400  141.5000      12.8       141       140        60
OIR    2025250     20200   17.0400  141.4800      12.9       141       136        60
OIR    2025250     20200   17.0400  141.4600      13.0       141       136        60
OIR    2025250     20200   17.0400  141.4400      13.1       141       140        60
OIR    2025250     20200   17.0400  141.4200      13.1       141       144        60
OIR    2025250     20200   17.0200  142.6600      10.6        72       140        60
OIR    2025250     20200   17.0200  141.6600      10.9       140       140        60
OIR    2025250     20200   17.0200  141.6400      11.1       141       136        60
OIR    2025250     20200   17.0200  141.6200      11.3       141       128        60
OIR    2025250     20200   17.0200  141.6000      11.5       141       140        60
OIR    2025250     20200   17.0200  141.5800      11.8       141       140        60
OIR    2025250     20200   17.0200  141.5600      12.0       142       140        60
OIR    2025250     20200   17.0200  141.5400      12.3       142       128        60
OIR    2025250     20200   17.0200  141.5200      12.5       142       144        60
OIR    2025250     20200   17.0200  141.5000      12.7       142       132        60
OIR    2025250     20200   17.0200  141.4800      12.8       142       144        60
OIR    2025250     20200   17.0200  141.4400      13.0       142       144        60
OIR    2025250     20200   17.0200  141.4000      13.1       142       144        60
OIR    2025250     20200   17.0000  142.7200      10.7        70       144        60
OIR    2025250     20200   17.0000  141.7200      10.2       138       128        60
OIR    2025250     20200   17.0000  141.7000      10.3       139       128        60
OIR    2025250     20200   17.0000  141.6800      10.5       139       136        60
OIR    2025250     20200   17.0000  141.6600      10.7       140       128        60
OIR    2025250     20200   17.0000  141.6400      10.9       141       136        60
OIR    2025250     20200   17.0000  141.6200      11.1       142       128        60
OIR    2025250     20200   17.0000  141.6000      11.3       143       128        60
OIR    2025250     20200   17.0000  141.5800      11.5       143       128        60
OIR    2025250     20200   17.0000  141.5600      11.8       144       128        60
OIR    2025250     20200   17.0000  141.5400      12.0       144       128        60
OIR    2025250     20200   17.0000  141.5200      12.2       145       132        60
OIR    2025250     20200   17.0000  141.5000      12.4       144       132        60
OIR    2025250     20200   17.0000  141.4800      12.6       143       136        60
OIR    2025250     20200   17.0000  141.4600      12.8       142       136        60
OIR    2025250     20200   17.0000  141.4400      13.0       142       136        60
OIR    2025250     20200   17.0000  141.4200      13.0       142       136        60
OIR    2025250     20200   16.9800  141.7200      10.1       139       136        60
OIR    2025250     20200   16.9800  141.7000      10.2       140       132        60
OIR    2025250     20200   16.9800  141.6800      10.3       140       136        60
OIR    2025250     20200   16.9800  141.6600      10.5       141       140        60
OIR    2025250     20200   16.9800  141.6400      10.7       142       128        60
OIR    2025250     20200   16.9800  141.6200      10.9       143       140        60
OIR    2025250     20200   16.9800  141.6000      11.0       144       140        60
OIR    2025250     20200   16.9800  141.5800      11.3       146       140        60
OIR    2025250     20200   16.9800  141.5600      11.5       147       140        60
OIR    2025250     20200   16.9800  141.5400      11.7       148       144        60
OIR    2025250     20200   16.9800  141.5200      11.8       148       132        60
OIR    2025250     20200   16.9800  141.5000      12.0       148       136        60
OIR    2025250     20200   16.9800  141.4800      12.2       147       144        60
OIR    2025250     20200   16.9800  141.4600      12.5       144       136        60
OIR    2025250     20200   16.9800  141.4400      12.7       143       140        60
OIR    2025250     20200   16.9800  141.4200      12.9       143       140        60
OIR    2025250     20200   16.9600  142.7400      10.5        69       144        60
OIR    2025250     20200   16.9600  142.7000      10.3        70       144        60
OIR    2025250     20200   16.9600  142.6800      10.2        70       140        60
OIR    2025250     20200   16.9600  141.7200       9.9       141       132        60
OIR    2025250     20200   16.9600  141.7000      10.0       142       136        60
OIR    2025250     20200   16.9600  141.6800      10.1       142       136        60
OIR    2025250     20200   16.9600  141.6600      10.3       143       140        60
OIR    2025250     20200   16.9600  141.6400      10.5       144       132        60
OIR    2025250     20200   16.9600  141.6200      10.6       145       132        60
OIR    2025250     20200   16.9600  141.6000      10.8       146       132        60
OIR    2025250     20200   16.9600  141.5800      11.0       148       132        60
OIR    2025250     20200   16.9600  141.5600      11.3       150       128        60
OIR    2025250     20200   16.9600  141.5400      11.4       151       136        60
OIR    2025250     20200   16.9600  141.5200      11.6       150       132        60
OIR    2025250     20200   16.9600  141.5000      11.8       149       132        60
OIR    2025250     20200   16.9600  141.4800      11.9       149       136        60
OIR    2025250     20200   16.9600  141.4600      12.0       148       140        60
OIR    2025250     20200   16.9600  141.4400      12.3       146       140        60
OIR    2025250     20200   16.9600  141.3800      13.1       144       144        60
OIR    2025250     20200   16.9400  141.7000       9.6       150       140        60
OIR    2025250     20200   16.9400  141.6800       9.7       150       136        60
OIR    2025250     20200   16.9400  141.6600       9.9       149       140        60
OIR    2025250     20200   16.9400  141.6200      10.3       149       144        60
OIR    2025250     20200   16.9400  141.6000      10.4       150       136        60
OIR    2025250     20200   16.9400  141.5800      10.7       152       140        60
OIR    2025250     20200   16.9400  141.5600      10.9       153       136        60
OIR    2025250     20200   16.9400  141.5400      11.2       154       132        60
OIR    2025250     20200   16.9400  141.5200      11.3       153       136        60
OIR    2025250     20200   16.9400  141.5000      11.5       151       132        60
OIR    2025250     20200   16.9400  141.4800      11.6       150       132        60
OIR    2025250     20200   16.9400  141.3800      12.9       146       140        60
OIR    2025250     20200   16.9400  141.3400      13.4       144       144        60
OIR    2025250     20200   16.9200  141.7000       9.6       156       136        60
OIR    2025250     20200   16.9200  141.6800       9.7       156       136        60
OIR    2025250     20200   16.9200  141.6600       9.8       156       132        60
OIR    2025250     20200   16.9200  141.6400       9.9       156       140        60
OIR    2025250     20200   16.9200  141.6200      10.0       155       144        60
OIR    2025250     20200   16.9200  141.6000      10.2       155       140        60
OIR    2025250     20200   16.9200  141.5800      10.4       155       136        60
OIR    2025250     20200   16.9200  141.5600      10.6       155       136        60
OIR    2025250     20200   16.9200  141.5400      10.9       155       132        60
OIR    2025250     20200   16.9200  141.5200      11.1       154       132        60
OIR    2025250     20200   16.9200  141.5000      11.2       153       132        60
OIR    2025250     20200   16.9200  141.4800      11.4       152       132        60
OIR    2025250     20200   16.9200  141.4600      11.7       151       132        60
OIR    2025250     20200   16.9200  141.3800      12.9       148       140        60
OIR    2025250     20200   16.9200  141.3600      13.1       147       140        60
OIR    2025250     20200   16.9000  142.7600      10.3        67       144        60
OIR    2025250     20200   16.9000  141.7000       9.7       160       140        60
OIR    2025250     20200   16.9000  141.6800       9.7       160       140        60
OIR    2025250     20200   16.9000  141.6400       9.8       159       128        60
OIR    2025250     20200   16.9000  141.6200       9.9       159       140        60
OIR    2025250     20200   16.9000  141.5800      10.1       158       136        60
OIR    2025250     20200   16.9000  141.5600      10.3       157       140        60
OIR    2025250     20200   16.9000  141.5400      10.4       157       136        60
OIR    2025250     20200   16.9000  141.5200      10.7       156       132        60
OIR    2025250     20200   16.9000  141.5000      10.9       155       132        60
OIR    2025250     20200   16.9000  141.4800      11.2       154       140        60
OIR    2025250     20200   16.9000  141.4600      11.5       153       140        60
OIR    2025250     20200   16.9000  141.3800      12.8       148       140        60
OIR    2025250     20200   16.9000  141.3600      13.1       148       140        60
OIR    2025250     20200   16.8800  141.6600       9.8       161       132        60
OIR    2025250     20200   16.8800  141.6400       9.8       161       136        60
OIR    2025250     20200   16.8800  141.6200       9.8       160       140        60
OIR    2025250     20200   16.8800  141.5800       9.9       160       136        60
OIR    2025250     20200   16.8800  141.5600      10.0       159       136        60
OIR    2025250     20200   16.8800  141.5000      10.6       157       136        60
OIR    2025250     20200   16.8800  141.4800      10.8       156       136        60
OIR    2025250     20200   16.8800  141.4600      11.2       154       136        60
OIR    2025250     20200   16.8800  141.4400      11.5       154       140        60
OIR    2025250     20200   16.8800  141.4200      11.9       153       140        60
OIR    2025250     20200   16.8800  141.4000      12.2       152       136        60
OIR    2025250     20200   16.8800  141.3800      12.8       149       136        60
OIR    2025250     20200   16.8800  141.3600      13.1       149       140        60
OIR    2025250     20200   16.8600  142.7600       9.5        65       136        60
OIR    2025250     20200   16.8600  141.6600       9.7       162       136        60
OIR    2025250     20200   16.8600  141.6400       9.8       162       136        60
OIR    2025250     20200   16.8600  141.5800       9.8       161       132        60
OIR    2025250     20200   16.8600  141.5400      10.0       160       136        60
OIR    2025250     20200   16.8600  141.5000      10.3       159       136        60
OIR    2025250     20200   16.8600  141.4800      10.5       157       136        60
OIR    2025250     20200   16.8600  141.4600      10.8       156       136        60
OIR    2025250     20200   16.8600  141.4400      11.2       155       136        60
OIR    2025250     20200   16.8600  141.4200      11.7       154       136        60
OIR    2025250     20200   16.8600  141.3800      12.9       150       136        60
OIR    2025250     20200   16.8400  142.7800       9.5        64       140        60
OIR    2025250     20200   16.8400  141.6600       9.7       162       140        60
OIR    2025250     20200   16.8400  141.6400       9.7       162       140        60
OIR    2025250     20200   16.8400  141.6200       9.7       162       140        60
OIR    2025250     20200   16.8400  141.6000       9.7       162       140        60
OIR    2025250     20200   16.8400  141.5400       9.9       161       136        60
OIR    2025250     20200   16.8400  141.4600      10.6       158       140        60
OIR    2025250     20200   16.8400  141.4400      10.9       157       128        60
OIR    2025250     20200   16.8400  141.4200      11.5       155       136        60
OIR    2025250     20200   16.8400  141.4000      12.2       152       132        60
OIR    2025250     20200   16.8400  141.3800      12.9       150       136        60
OIR    2025250     20200   16.8200  142.8000       9.4        63       140        60
OIR    2025250     20200   16.8200  141.6600       9.7       163       140        60
OIR    2025250     20200   16.8200  141.4200      11.3       158       136        60
OIR    2025250     20200   16.8200  141.4000      12.0       154       132        60
OIR    2025250     20200   16.8200  141.3800      12.8       151       140        60
OIR    2025250     20200   16.8000  142.8200       9.3        62       140        60
OIR    2025250     20200   16.8000  142.7800       9.2        63       140        60
OIR    2025250     20200   16.8000  141.5600       9.8       163       140        60
OIR    2025250     20200   16.8000  141.4600      10.3       162       136        60
OIR    2025250     20200   16.8000  141.4200      11.0       160       136        60
OIR    2025250     20200   16.8000  141.4000      11.7       157       136        60
OIR    2025250     20200   16.8000  141.3600      13.0       151       136        60
OIR    2025250     20200   16.8000  141.3400      13.1       151       140        60
OIR    2025250     20200   16.7800  142.8400       9.3        60       140        60
OIR    2025250     20200   16.7800  141.6200       9.6       164       136        60
OIR    2025250     20200   16.7800  141.4000      11.4       159       136        60
OIR    2025250     20200   16.7800  141.3800      12.3       154       132        60
OIR    2025250     20200   16.7800  141.3600      12.9       152       136        60
OIR    2025250     20200   16.7600  142.8400       9.2        59       136        60
OIR    2025250     20200   16.7600  141.6000       9.6       164       140        60
OIR    2025250     20200   16.7600  141.3800      12.0       157       140        60
OIR    2025250     20200   16.7400  141.3600      12.5       156       136        60
OIR    2025250     20200   16.7400  141.3400      12.9       154       136        60
OIR    2025250     20200   16.7400  141.3200      13.2       153       140        60
OIR    2025250     20200   16.7200  142.8400       8.7        56       136        60
OIR    2025250     20200   16.7200  141.3200      13.0       155       136        60
OIR    2025250     20200   16.7000  142.8400       8.4        54       140        60
OIR    2025250     20200   16.6600  142.8400       7.6        47       140        60
OIR    2025250     20200   16.6400  142.8400       7.3        42       140        60
OIR    2025250     20200   16.6400  141.5400       9.6       164       140        60
OIR    2025250     20200   16.6200  142.8600       7.1        37       140        60
OIR    2025250     20200   16.6200  142.8200       7.2        41       140        60
OIR    2025250     20200   16.6200  141.5400       9.6       164       140        60
OIR    2025250     20200   16.6000  142.8200       7.0        39       140        60
OIR    2025250     20200   16.5600  142.8200       6.9        37       140        60
OIR    2025250     20200   16.5400  141.5200       9.4       166       140        60
OIR    2025250     20200   16.4800  142.8200       6.8        35       140        60
OIR    2025250     20200   16.4200  141.5400       8.1       176       140        60
OIR    2025250     20200   16.4000  142.8000       5.6        29       144        60
OIR    2025250     20200   16.4000  142.7800       5.3        29       144        60
OIR    2025250     20200   16.4000  141.5200       8.0       177       140        60
OIR    2025250     20200   16.3800  142.7800       5.3        28       144        60
OIR    2025250     20200   16.3800  141.5400       7.9       177       144        60
OIR    2025250     20200   16.3800  141.5200       7.9       177       144        60
OIR    2025250     20200   16.3400  142.7800       5.4        28       144        60
OIR    2025250     20200   16.3400  142.7600       5.2        28       144        60
OIR    2025250     20200   16.3400  141.5400       7.6       178       140        60
OIR    2025250     20200   16.3200  142.7800       5.5        27       144        60
OIR    2025250     20200   16.3200  142.7600       5.2        27       144        60
OIR    2025250     20200   16.3000  142.7600       5.2        26       140        60
OIR    2025250     20200   16.3000  142.7400       5.0        26       140        60
OIR    2025250     20200   16.2800  142.7400       5.1        24       140        60
OIR    2025250     20200   16.2600  141.5600       6.9       185       144        60
OIR    2025250     20200   16.2400  141.5200       6.9       186       140        60
OIR    2025250     20200   16.2200  142.7400       5.5        22       140        60
OIR    2025250     20200   16.2200  141.5600       6.4       191       140        60
OIR    2025250     20200   16.1800  142.6600       4.0        14       144        60
OIR    2025250     20200   16.1400  141.5800       6.1       196       144        60
OIR    2025250     20200   16.1000  141.6200       5.6       203       144        60
OIR    2025250     20200   16.0800  141.6200       5.6       204       140        60
OIR    2025250     20200   16.0600  141.6400       5.5       205       144        60
OIR    2025250     20200   16.0400  141.6800       5.3       206       144        60
OIR    2025250     20200   16.0400  141.6600       5.4       206       144        60
OIR    2025250     20200   16.0400  141.6400       5.5       205       144        60
OIR    2025250     20200   16.0200  141.7000       5.2       207       140        60
OIR    2025250     20200   16.0200  141.6800       5.3       208       140        60
OIR    2025250     20200   16.0000  141.7400       5.1       211       144        60
OIR    2025250     20200   16.0000  141.7200       5.0       214       144        60
OIR    2025250     20200   15.9200  141.9000       4.5       235       144        60
OIR    2025250     20200   15.9200  141.8800       4.5       233       144        60
OIR    2025250     20200   15.9000  142.1200       4.0       257       144        60
OIR    2025250     20200   15.8800  142.0000       4.5       245       140        60
OIR    2025250     20200   15.8800  141.9800       4.5       245       144        60
OIR    2025250     20200   15.8800  141.9200       4.6       242       144        60
OIR    2025250     20200   15.8600  142.2000       4.2       273       144        60
OIR    2025250     20200   17.2000  142.3000      11.3        87       136        60
OIR    2025250     20200   17.2000  142.2800      11.3        88       132        60
OIR    2025250     20200   17.2000  142.2600      11.3        89       132        60
OIR    2025250     20200   17.2000  142.2400      11.2        89       128        60
OIR    2025250     20200   17.2000  142.2200      11.2        90       128        60
OIR    2025250     20200   17.2000  142.2000      11.2        91       128        60
OIR    2025250     20200   17.2000  142.1800      11.2        92       128        60
OIR    2025250     20200   17.2000  142.1600      11.2        92       128        60
OIR    2025250     20200   17.2000  142.1400      11.2        94       132        60
OIR    2025250     20200   17.2000  142.1200      11.3        95       128        60
OIR    2025250     20200   17.2000  142.1000      11.3        96       128        60
OIR    2025250     20200   17.2000  142.0800      11.3        97       132        60
OIR    2025250     20200   17.2000  142.0600      11.4        98       128        60
OIR    2025250     20200   17.2000  142.0400      11.4       100       132        60
OIR    2025250     20200   17.2000  142.0200      11.4       101       132        60
OIR    2025250     20200   17.2000  142.0000      11.4       103       128        60
OIR    2025250     20200   17.2000  141.9800      11.3       104       132        60
OIR    2025250     20200   17.2000  141.9600      11.3       106       136        60
OIR    2025250     20200   17.2000  141.9400      11.4       108       140        60
OIR    2025250     20200   17.2000  141.9200      11.4       109       132        60
OIR    2025250     20200   17.2000  141.9000      11.5       111       136        60
OIR    2025250     20200   17.2000  141.8800      11.6       113       136        60
OIR    2025250     20200   17.2000  141.8600      11.7       114       136        60
OIR    2025250     20200   17.2000  141.8400      11.8       115       136        60
OIR    2025250     20200   17.2000  141.8200      11.9       116       132        60
OIR    2025250     20200   17.2000  141.8000      12.0       117       136        60
OIR    2025250     20200   17.2000  141.7800      12.1       117       136        60
OIR    2025250     20200   17.2000  141.7600      12.2       118       132        60
OIR    2025250     20200   17.1800  142.3200      11.1        86       136        60
OIR    2025250     20200   17.1800  142.3000      11.1        87       128        60
OIR    2025250     20200   17.1800  142.2800      11.1        88       128        60
OIR    2025250     20200   17.1800  142.2600      11.1        88       123        60
OIR    2025250     20200   17.1800  142.2400      11.1        89       128        60
OIR    2025250     20200   17.1800  142.2200      11.1        90       128        60
OIR    2025250     20200   17.1800  142.2000      11.1        90       128        60
OIR    2025250     20200   17.1800  142.1800      11.1        91       128        60
OIR    2025250     20200   17.1800  142.1600      11.0        92       123        60
OIR    2025250     20200   17.1800  142.1400      11.1        93       123        60
OIR    2025250     20200   17.1800  142.1200      11.1        94       123        60
OIR    2025250     20200   17.1800  142.1000      11.1        96       123        60
OIR    2025250     20200   17.1800  142.0800      11.2        97       128        60
OIR    2025250     20200   17.1800  142.0600      11.2        98       132        60
OIR    2025250     20200   17.1800  142.0400      11.2       100       132        60
OIR    2025250     20200   17.1800  142.0200      11.2       102       132        60
OIR    2025250     20200   17.1800  142.0000      11.2       104       132        60
OIR    2025250     20200   17.1800  141.9800      11.2       105       132        60
OIR    2025250     20200   17.1800  141.9600      11.2       107       132        60
OIR    2025250     20200   17.1800  141.9400      11.2       108       132        60
OIR    2025250     20200   17.1800  141.9200      11.3       110       136        60
OIR    2025250     20200   17.1800  141.9000      11.3       111       132        60
OIR    2025250     20200   17.1800  141.8800      11.4       113       132        60
OIR    2025250     20200   17.1800  141.8600      11.5       114       132        60
OIR    2025250     20200   17.1800  141.8400      11.6       115       128        60
OIR    2025250     20200   17.1800  141.8200      11.7       116       136        60
OIR    2025250     20200   17.1800  141.8000      11.8       117       132        60
OIR    2025250     20200   17.1800  141.7800      12.0       117       136        60
OIR    2025250     20200   17.1800  141.7600      12.1       118       132        60
OIR    2025250     20200   17.1800  141.7400      12.2       118       140        60
OIR    2025250     20200   17.1600  142.3400      11.0        85       132        60
OIR    2025250     20200   17.1600  142.3200      11.0        86       132        60
OIR    2025250     20200   17.1600  142.3000      11.0        87       132        60
OIR    2025250     20200   17.1600  142.2800      11.0        88       128        60
OIR    2025250     20200   17.1600  142.2600      11.0        88       128        60
OIR    2025250     20200   17.1600  142.2400      10.9        89       128        60
OIR    2025250     20200   17.1600  142.2200      10.9        89       128        60
OIR    2025250     20200   17.1600  142.2000      10.9        90       128        60
OIR    2025250     20200   17.1600  142.1800      10.9        91       128        60
OIR    2025250     20200   17.1600  142.1600      10.9        91       132        60
OIR    2025250     20200   17.1600  142.1400      10.9        92       132        60
OIR    2025250     20200   17.1600  142.1200      10.9        94       132        60
OIR    2025250     20200   17.1600  142.1000      10.9        95       132        60
OIR    2025250     20200   17.1600  142.0800      11.0        97       128        60
OIR    2025250     20200   17.1600  142.0600      11.0        99       128        60
OIR    2025250     20200   17.1600  142.0400      11.0       101       132        60
OIR    2025250     20200   17.1600  142.0200      11.0       103       128        60
OIR    2025250     20200   17.1600  142.0000      11.0       105       132        60
OIR    2025250     20200   17.1600  141.9800      11.0       106       128        60
OIR    2025250     20200   17.1600  141.9600      11.0       108       128        60
OIR    2025250     20200   17.1600  141.9400      11.0       109       136        60
OIR    2025250     20200   17.1600  141.9200      11.1       111       128        60
OIR    2025250     20200   17.1600  141.9000      11.2       112       132        60
OIR    2025250     20200   17.1600  141.8800      11.3       113       132        60
OIR    2025250     20200   17.1600  141.8600      11.4       114       132        60
OIR    2025250     20200   17.1600  141.8400      11.4       115       136        60
OIR    2025250     20200   17.1600  141.8200      11.5       116       132        60
OIR    2025250     20200   17.1600  141.8000      11.6       117       136        60
OIR    2025250     20200   17.1600  141.7800      11.8       118       136        60
OIR    2025250     20200   17.1600  141.7600      11.9       118       132        60
OIR    2025250     20200   17.1600  141.7400      12.0       119       132        60
OIR    2025250     20200   17.1400  142.3800      10.9        84       128        60
OIR    2025250     20200   17.1400  142.3600      10.9        85       128        60
OIR    2025250     20200   17.1400  142.3400      10.9        85       128        60
OIR    2025250     20200   17.1400  142.3200      10.9        86       128        60
OIR    2025250     20200   17.1400  142.3000      10.8        87       123        60
OIR    2025250     20200   17.1400  142.2800      10.8        87       128        60
OIR    2025250     20200   17.1400  142.2600      10.8        88       119        60
OIR    2025250     20200   17.1400  142.2400      10.8        88       123        60
OIR    2025250     20200   17.1400  142.2200      10.8        89       123        60
OIR    2025250     20200   17.1400  142.2000      10.8        90       123        60
OIR    2025250     20200   17.1400  142.1800      10.8        90       128        60
OIR    2025250     20200   17.1400  142.1600      10.8        91       123        60
OIR    2025250     20200   17.1400  142.1400      10.7        92       123        60
OIR    2025250     20200   17.1400  142.1200      10.7        93       123        60
OIR    2025250     20200   17.1400  142.1000      10.8        95       123        60
OIR    2025250     20200   17.1400  142.0800      10.7        98       123        60
OIR    2025250     20200   17.1400  142.0600      10.7       101       119        60
OIR    2025250     20200   17.1400  142.0400      10.7       103       128        60
OIR    2025250     20200   17.1400  142.0200      10.8       105       128        60
OIR    2025250     20200   17.1400  142.0000      10.8       107       123        60
OIR    2025250     20200   17.1400  141.9800      10.8       108       128        60
OIR    2025250     20200   17.1400  141.9600      10.8       109       128        60
OIR    2025250     20200   17.1400  141.9400      10.9       110       123        60
OIR    2025250     20200   17.1400  141.9200      11.0       111       123        60
OIR    2025250     20200   17.1400  141.9000      11.0       112       128        60
OIR    2025250     20200   17.1400  141.8800      11.1       113       123        60
OIR    2025250     20200   17.1400  141.8600      11.2       114       132        60
OIR    2025250     20200   17.1400  141.8400      11.3       115       132        60
OIR    2025250     20200   17.1400  141.8200      11.4       116       132        60
OIR    2025250     20200   17.1400  141.8000      11.5       117       128        60
OIR    2025250     20200   17.1400  141.7800      11.6       118       128        60
OIR    2025250     20200   17.1400  141.7600      11.7       119       132        60
OIR    2025250     20200   17.1400  141.7400      11.8       120       132        60
OIR    2025250     20200   17.1200  142.4200      10.5        81       136        60
OIR    2025250     20200   17.1200  142.4000      10.6        82       128        60
OIR    2025250     20200   17.1200  142.3800      10.7        83       128        60
OIR    2025250     20200   17.1200  142.3600      10.7        84       128        60
OIR    2025250     20200   17.1200  142.3400      10.7        85       128        60
OIR    2025250     20200   17.1200  142.3200      10.7        86       128        60
OIR    2025250     20200   17.1200  142.3000      10.7        87       123        60
OIR    2025250     20200   17.1200  142.2800      10.7        87       123        60
OIR    2025250     20200   17.1200  142.2600      10.7        88       123        60
OIR    2025250     20200   17.1200  142.2400      10.7        88       123        60
OIR    2025250     20200   17.1200  142.2200      10.7        89       123        60
OIR    2025250     20200   17.1200  142.2000      10.7        90       123        60
OIR    2025250     20200   17.1200  142.1800      10.7        90       128        60
OIR    2025250     20200   17.1200  142.1600      10.6        91       123        60
OIR    2025250     20200   17.1200  142.1400      10.6        91       123        60
OIR    2025250     20200   17.1200  142.1200      10.6        93       128        60
OIR    2025250     20200   17.1200  142.1000      10.6        95       128        60
OIR    2025250     20200   17.1200  142.0800      10.5        99       123        60
OIR    2025250     20200   17.1200  142.0600      10.5       102       123        60
OIR    2025250     20200   17.1200  142.0400      10.6       105       128        60
OIR    2025250     20200   17.1200  142.0200      10.6       107       123        60
OIR    2025250     20200   17.1200  142.0000      10.6       108       119        60
OIR    2025250     20200   17.1200  141.9800      10.6       109       128        60
OIR    2025250     20200   17.1200  141.9600      10.7       110       123        60
OIR    2025250     20200   17.1200  141.9400      10.7       111       123        60
OIR    2025250     20200   17.1200  141.9200      10.8       111       123        60
OIR    2025250     20200   17.1200  141.9000      10.9       112       123        60
OIR    2025250     20200   17.1200  141.8800      10.9       113       128        60
OIR    2025250     20200   17.1200  141.8600      11.0       114       123        60
OIR    2025250     20200   17.1200  141.8400      11.1       115       132        60
OIR    2025250     20200   17.1200  141.8200      11.2       116       128        60
OIR    2025250     20200   17.1200  141.8000      11.3       117       128        60
OIR    2025250     20200   17.1200  141.7800      11.3       118       123        60
OIR    2025250     20200   17.1200  141.7600      11.4       120       132        60
OIR    2025250     20200   17.1200  141.7400      11.6       121       136        60
OIR    2025250     20200   17.1000  142.4400      10.4        79       132        60
OIR    2025250     20200   17.1000  142.4200      10.4        80       128        60
OIR    2025250     20200   17.1000  142.4000      10.5        81       128        60
OIR    2025250     20200   17.1000  142.3800      10.5        82       128        60
OIR    2025250     20200   17.1000  142.3600      10.6        83       123        60
OIR    2025250     20200   17.1000  142.3400      10.6        84       128        60
OIR    2025250     20200   17.1000  142.3200      10.6        86       119        60
OIR    2025250     20200   17.1000  142.3000      10.7        87       128        60
OIR    2025250     20200   17.1000  142.2800      10.7        87       123        60
OIR    2025250     20200   17.1000  142.2600      10.7        88       123        60
OIR    2025250     20200   17.1000  142.2400      10.7        88       128        60
OIR    2025250     20200   17.1000  142.2200      10.6        89       123        60
OIR    2025250     20200   17.1000  142.2000      10.6        90       128        60
OIR    2025250     20200   17.1000  142.1800      10.6        90       123        60
OIR    2025250     20200   17.1000  142.1600      10.6        90       123        60
OIR    2025250     20200   17.1000  142.1400      10.5        91       128        60
OIR    2025250     20200   17.1000  142.1200      10.5        92       119        60
OIR    2025250     20200   17.1000  142.1000      10.4        94       123        60
OIR    2025250     20200   17.1000  142.0800      10.4        99       123        60
OIR    2025250     20200   17.1000  142.0600      10.4       103       119        60
OIR    2025250     20200   17.1000  142.0400      10.4       106       128        60
OIR    2025250     20200   17.1000  142.0200      10.5       108       128        60
OIR    2025250     20200   17.1000  142.0000      10.5       109       123        60
OIR    2025250     20200   17.1000  141.9800      10.5       110       123        60
OIR    2025250     20200   17.1000  141.9600      10.6       110       128        60
OIR    2025250     20200   17.1000  141.9400      10.6       111       128        60
OIR    2025250     20200   17.1000  141.9200      10.6       112       128        60
OIR    2025250     20200   17.1000  141.9000      10.7       113       123        60
OIR    2025250     20200   17.1000  141.8800      10.8       113       128        60
OIR    2025250     20200   17.1000  141.8600      10.9       114       123        60
OIR    2025250     20200   17.1000  141.8400      10.9       115       128        60
OIR    2025250     20200   17.1000  141.8200      11.0       117       128        60
OIR    2025250     20200   17.1000  141.8000      11.0       118       128        60
OIR    2025250     20200   17.1000  141.7800      11.1       119       128        60
OIR    2025250     20200   17.1000  141.7600      11.2       121       128        60
OIR    2025250     20200   17.1000  141.7400      11.3       123       128        60
OIR    2025250     20200   17.1000  141.7200      11.4       125       132        60
OIR    2025250     20200   17.0800  142.4600      10.3        78       132        60
OIR    2025250     20200   17.0800  142.4400      10.3        79       128        60
OIR    2025250     20200   17.0800  142.4200      10.3        79       132        60
OIR    2025250     20200   17.0800  142.4000      10.3        80       123        60
OIR    2025250     20200   17.0800  142.3800      10.4        82       128        60
OIR    2025250     20200   17.0800  142.3600      10.5        83       128        60
OIR    2025250     20200   17.0800  142.3400      10.5        84       123        60
OIR    2025250     20200   17.0800  142.3200      10.6        85       123        60
OIR    2025250     20200   17.0800  142.3000      10.6        87       115        60
OIR    2025250     20200   17.0800  142.2800      10.6        87       128        60
OIR    2025250     20200   17.0800  142.2600      10.6        88       115        60
OIR    2025250     20200   17.0800  142.2400      10.6        88       128        60
OIR    2025250     20200   17.0800  142.2200      10.6        89       115        60
OIR    2025250     20200   17.0800  142.2000      10.5        90       115        60
OIR    2025250     20200   17.0800  142.1800      10.5        90       115        60
OIR    2025250     20200   17.0800  142.1600      10.5        90       119        60
OIR    2025250     20200   17.0800  142.1400      10.5        91       123        60
OIR    2025250     20200   17.0800  142.1200      10.4        92       115        60
OIR    2025250     20200   17.0800  142.1000      10.3        94       123        60
OIR    2025250     20200   17.0800  142.0800      10.2        99       115        60
OIR    2025250     20200   17.0800  142.0600      10.3       105       115        60
OIR    2025250     20200   17.0800  142.0400      10.3       108       119        60
OIR    2025250     20200   17.0800  142.0200      10.3       109       115        60
OIR    2025250     20200   17.0800  142.0000      10.4       110       115        60
OIR    2025250     20200   17.0800  141.9800      10.4       111       115        60
OIR    2025250     20200   17.0800  141.9600      10.4       111       115        60
OIR    2025250     20200   17.0800  141.9400      10.5       112       115        60
OIR    2025250     20200   17.0800  141.9200      10.5       112       128        60
OIR    2025250     20200   17.0800  141.9000      10.6       113       115        60
OIR    2025250     20200   17.0800  141.8800      10.6       113       115        60
OIR    2025250     20200   17.0800  141.8600      10.7       114       115        60
OIR    2025250     20200   17.0800  141.8400      10.8       116       123        60
OIR    2025250     20200   17.0800  141.8200      10.8       117       132        60
OIR    2025250     20200   17.0800  141.8000      10.8       118       132        60
OIR    2025250     20200   17.0800  141.7800      10.8       120       132        60
OIR    2025250     20200   17.0800  141.7600      10.9       123       128        60
OIR    2025250     20200   17.0800  141.7400      10.9       126       128        60
OIR    2025250     20200   17.0800  141.7200      11.1       129       128        60
OIR    2025250     20200   17.0800  141.7000      11.2       132       132        60
OIR    2025250     20200   17.0600  142.5000      10.3        77       128        60
OIR    2025250     20200   17.0600  142.4800      10.3        77       132        60
OIR    2025250     20200   17.0600  142.4600      10.3        78       123        60
OIR    2025250     20200   17.0600  142.4400      10.2        78       119        60
OIR    2025250     20200   17.0600  142.4200      10.3        79       132        60
OIR    2025250     20200   17.0600  142.4000      10.3        80       123        60
OIR    2025250     20200   17.0600  142.3800      10.3        81       128        60
OIR    2025250     20200   17.0600  142.3600      10.4        82       119        60
OIR    2025250     20200   17.0600  142.3400      10.4        83       123        60
OIR    2025250     20200   17.0600  142.3200      10.5        85       123        60
OIR    2025250     20200   17.0600  142.3000      10.6        87       128        60
OIR    2025250     20200   17.0600  142.2800      10.6        88       119        60
OIR    2025250     20200   17.0600  142.2600      10.6        88       123        60
OIR    2025250     20200   17.0600  142.2400      10.6        89       123        60
OIR    2025250     20200   17.0600  142.2200      10.5        89       119        60
OIR    2025250     20200   17.0600  142.2000      10.5        90       119        60
OIR    2025250     20200   17.0600  142.1800      10.5        90       123        60
OIR    2025250     20200   17.0600  142.1600      10.5        90       123        60
OIR    2025250     20200   17.0600  142.1400      10.4        91       115        60
OIR    2025250     20200   17.0600  142.1200      10.3        92       119        60
OIR    2025250     20200   17.0600  142.1000      10.2        94       111        60
OIR    2025250     20200   17.0600  142.0800      10.1       100       111        60
OIR    2025250     20200   17.0600  142.0600      10.1       106       111        60
OIR    2025250     20200   17.0600  142.0400      10.2       108       115        60
OIR    2025250     20200   17.0600  142.0200      10.3       110       115        60
OIR    2025250     20200   17.0600  142.0000      10.3       111       119        60
OIR    2025250     20200   17.0600  141.9800      10.3       111       123        60
OIR    2025250     20200   17.0600  141.9600      10.4       112       119        60
OIR    2025250     20200   17.0600  141.9400      10.4       112       123        60
OIR    2025250     20200   17.0600  141.9200      10.4       113       123        60
OIR    2025250     20200   17.0600  141.9000      10.4       113       119        60
OIR    2025250     20200   17.0600  141.8800      10.5       114       123        60
OIR    2025250     20200   17.0600  141.8600      10.5       115       123        60
OIR    2025250     20200   17.0600  141.8400      10.6       116       128        60
OIR    2025250     20200   17.0600  141.8200      10.6       117       123        60
OIR    2025250     20200   17.0600  141.8000      10.6       119       128        60
OIR    2025250     20200   17.0600  141.7800      10.6       121       128        60
OIR    2025250     20200   17.0600  141.7600      10.6       125       123        60
OIR    2025250     20200   17.0600  141.7400      10.6       130       128        60
OIR    2025250     20200   17.0600  141.7200      10.7       133       132        60
OIR    2025250     20200   17.0600  141.7000      10.9       135       128        60
OIR    2025250     20200   17.0400  142.5800      10.3        74       128        60
OIR    2025250     20200   17.0400  142.5400      10.3        75       132        60
OIR    2025250     20200   17.0400  142.5200      10.2        76       128        60
OIR    2025250     20200   17.0400  142.5000      10.2        76       128        60
OIR    2025250     20200   17.0400  142.4800      10.2        77       128        60
OIR    2025250     20200   17.0400  142.4600      10.2        77       123        60
OIR    2025250     20200   17.0400  142.4400      10.2        78       119        60
OIR    2025250     20200   17.0400  142.4200      10.2        78       123        60
OIR    2025250     20200   17.0400  142.4000      10.2        79       123        60
OIR    2025250     20200   17.0400  142.3800      10.2        80       115        60
OIR    2025250     20200   17.0400  142.3600      10.3        81       119        60
OIR    2025250     20200   17.0400  142.3400      10.4        83       119        60
OIR    2025250     20200   17.0400  142.3200      10.4        85       119        60
OIR    2025250     20200   17.0400  142.3000      10.5        87       123        60
OIR    2025250     20200   17.0400  142.2800      10.5        88       119        60
OIR    2025250     20200   17.0400  142.2600      10.5        88       115        60
OIR    2025250     20200   17.0400  142.2400      10.5        89       123        60
OIR    2025250     20200   17.0400  142.2200      10.5        89       115        60
OIR    2025250     20200   17.0400  142.2000      10.5        90       119        60
OIR    2025250     20200   17.0400  142.1800      10.4        90       119        60
OIR    2025250     20200   17.0400  142.1600      10.4        90       119        60
OIR    2025250     20200   17.0400  142.1400      10.3        91       115        60
OIR    2025250     20200   17.0400  142.1200      10.2        93       115        60
OIR    2025250     20200   17.0400  142.1000      10.0        97       115        60
OIR    2025250     20200   17.0400  142.0800      10.0       102       115        60
OIR    2025250     20200   17.0400  142.0600      10.0       107       111        60
OIR    2025250     20200   17.0400  142.0400      10.1       109       119        60
OIR    2025250     20200   17.0400  142.0200      10.1       110       119        60
OIR    2025250     20200   17.0400  142.0000      10.2       111       119        60
OIR    2025250     20200   17.0400  141.9800      10.2       112       123        60
OIR    2025250     20200   17.0400  141.9600      10.2       112       123        60
OIR    2025250     20200   17.0400  141.9400      10.3       113       119        60
OIR    2025250     20200   17.0400  141.9200      10.3       113       123        60
OIR    2025250     20200   17.0400  141.9000      10.3       114       119        60
OIR    2025250     20200   17.0400  141.8800      10.3       114       115        60
OIR    2025250     20200   17.0400  141.8600      10.4       115       123        60
OIR    2025250     20200   17.0400  141.8400      10.4       116       123        60
OIR    2025250     20200   17.0400  141.8200      10.4       118       119        60
OIR    2025250     20200   17.0400  141.8000      10.4       120       128        60
OIR    2025250     20200   17.0400  141.7800      10.4       123       123        60
OIR    2025250     20200   17.0400  141.7600      10.3       128       128        60
OIR    2025250     20200   17.0400  141.7400      10.4       133       123        60
OIR    2025250     20200   17.0400  141.7200      10.5       136       123        60
OIR    2025250     20200   17.0400  141.7000      10.7       137       132        60
OIR    2025250     20200   17.0400  141.6800      10.9       138       128        60
OIR    2025250     20200   17.0200  142.6200      10.4        72       132        60
OIR    2025250     20200   17.0200  142.6000      10.3        73       136        60
OIR    2025250     20200   17.0200  142.5800      10.3        74       132        60
OIR    2025250     20200   17.0200  142.5600      10.2        74       132        60
OIR    2025250     20200   17.0200  142.5400      10.2        75       132        60
OIR    2025250     20200   17.0200  142.5200      10.2        75       128        60
OIR    2025250     20200   17.0200  142.5000      10.2        76       123        60
OIR    2025250     20200   17.0200  142.4800      10.1        76       128        60
OIR    2025250     20200   17.0200  142.4600      10.1        77       128        60
OIR    2025250     20200   17.0200  142.4400      10.1        77       128        60
OIR    2025250     20200   17.0200  142.4200      10.1        78       123        60
OIR    2025250     20200   17.0200  142.4000      10.1        79       123        60
OIR    2025250     20200   17.0200  142.3800      10.2        80       119        60
OIR    2025250     20200   17.0200  142.3600      10.3        81       123        60
OIR    2025250     20200   17.0200  142.3400      10.3        83       119        60
OIR    2025250     20200   17.0200  142.3200      10.4        85       115        60
OIR    2025250     20200   17.0200  142.3000      10.5        87       119        60
OIR    2025250     20200   17.0200  142.2800      10.5        88       115        60
OIR    2025250     20200   17.0200  142.2600      10.5        88       123        60
OIR    2025250     20200   17.0200  142.2400      10.5        89       119        60
OIR    2025250     20200   17.0200  142.2200      10.5        89       119        60
OIR    2025250     20200   17.0200  142.2000      10.4        90       119        60
OIR    2025250     20200   17.0200  142.1800      10.4        90       111        60
OIR    2025250     20200   17.0200  142.1600      10.4        90       111        60
OIR    2025250     20200   17.0200  142.1400      10.2        92       111        60
OIR    2025250     20200   17.0200  142.1200      10.0        94       111        60
OIR    2025250     20200   17.0200  142.1000       9.9        99       115        60
OIR    2025250     20200   17.0200  142.0800       9.9       104       111        60
OIR    2025250     20200   17.0200  142.0600       9.9       108       111        60
OIR    2025250     20200   17.0200  142.0400      10.0       110       115        60
OIR    2025250     20200   17.0200  142.0200      10.0       111       119        60
OIR    2025250     20200   17.0200  142.0000      10.1       112       119        60
OIR    2025250     20200   17.0200  141.9800      10.1       112       119        60
OIR    2025250     20200   17.0200  141.9600      10.1       113       119        60
OIR    2025250     20200   17.0200  141.9400      10.2       113       119        60
OIR    2025250     20200   17.0200  141.9200      10.2       113       119        60
OIR    2025250     20200   17.0200  141.9000      10.2       114       115        60
OIR    2025250     20200   17.0200  141.8800      10.2       114       119        60
OIR    2025250     20200   17.0200  141.8600      10.2       115       119        60
OIR    2025250     20200   17.0200  141.8400      10.2       117       115        60
OIR    2025250     20200   17.0200  141.8200      10.1       119       128        60
OIR    2025250     20200   17.0200  141.8000      10.1       122       123        60
OIR    2025250     20200   17.0200  141.7800      10.1       127       123        60
OIR    2025250     20200   17.0200  141.7600      10.1       132       128        60
OIR    2025250     20200   17.0200  141.7400      10.2       135       132        60
OIR    2025250     20200   17.0200  141.7200      10.3       137       132        60
OIR    2025250     20200   17.0200  141.7000      10.5       138       132        60
OIR    2025250     20200   17.0200  141.6800      10.7       139       136        60
OIR    2025250     20200   17.0000  142.6400      10.3        72       136        60
OIR    2025250     20200   17.0000  142.6200      10.2        72       132        60
OIR    2025250     20200   17.0000  142.6000      10.2        73       132        60
OIR    2025250     20200   17.0000  142.5800      10.2        73       128        60
OIR    2025250     20200   17.0000  142.5600      10.1        74       128        60
OIR    2025250     20200   17.0000  142.5400      10.1        75       128        60
OIR    2025250     20200   17.0000  142.5200      10.1        75       123        60
OIR    2025250     20200   17.0000  142.5000      10.1        76       123        60
OIR    2025250     20200   17.0000  142.4800      10.1        76       123        60
OIR    2025250     20200   17.0000  142.4600      10.1        77       123        60
OIR    2025250     20200   17.0000  142.4400      10.1        77       119        60
OIR    2025250     20200   17.0000  142.4200      10.1        78       119        60
OIR    2025250     20200   17.0000  142.4000      10.1        78       123        60
OIR    2025250     20200   17.0000  142.3800      10.1        79       115        60
OIR    2025250     20200   17.0000  142.3600      10.2        80       119        60
OIR    2025250     20200   17.0000  142.3400      10.2        82       119        60
OIR    2025250     20200   17.0000  142.3200      10.3        84       123        60
OIR    2025250     20200   17.0000  142.3000      10.4        86       119        60
OIR    2025250     20200   17.0000  142.2800      10.4        87       111        60
OIR    2025250     20200   17.0000  142.2600      10.5        88       119        60
OIR    2025250     20200   17.0000  142.2400      10.5        89       115        60
OIR    2025250     20200   17.0000  142.2200      10.4        89       119        60
OIR    2025250     20200   17.0000  142.2000      10.4        89       115        60
OIR    2025250     20200   17.0000  142.1800      10.4        90       111        60
OIR    2025250     20200   17.0000  142.1600      10.2        91       115        60
OIR    2025250     20200   17.0000  142.1400      10.0        94       115        60
OIR    2025250     20200   17.0000  142.1200      10.0        98       111        60
OIR    2025250     20200   17.0000  142.1000       9.9       103       115        60
OIR    2025250     20200   17.0000  142.0800       9.9       107       111        60
OIR    2025250     20200   17.0000  142.0600       9.9       110       111        60
OIR    2025250     20200   17.0000  142.0400       9.9       111       115        60
OIR    2025250     20200   17.0000  142.0200      10.0       112       119        60
OIR    2025250     20200   17.0000  142.0000      10.0       113       115        60
OIR    2025250     20200   17.0000  141.9800      10.0       113       123        60
OIR    2025250     20200   17.0000  141.9600      10.0       114       123        60
OIR    2025250     20200   17.0000  141.9400      10.1       114       123        60
OIR    2025250     20200   17.0000  141.9200      10.1       114       123        60
OIR    2025250     20200   17.0000  141.9000      10.1       115       119        60
OIR    2025250     20200   17.0000  141.8800      10.1       115       119        60
OIR    2025250     20200   17.0000  141.8600      10.1       116       123        60
OIR    2025250     20200   17.0000  141.8400      10.0       118       123        60
OIR    2025250     20200   17.0000  141.8200       9.9       121       128        60
OIR    2025250     20200   17.0000  141.8000       9.8       126       123        60
OIR    2025250     20200   17.0000  141.7800       9.8       131       123        60
OIR    2025250     20200   17.0000  141.7600      10.0       135       123        60
OIR    2025250     20200   17.0000  141.7400      10.1       137       128        60
OIR    2025250     20200   16.9800  142.6600      10.3        71       140        60
OIR    2025250     20200   16.9800  142.6400      10.2        71       132        60
OIR    2025250     20200   16.9800  142.6200      10.1        72       132        60
OIR    2025250     20200   16.9800  142.6000      10.1        72       132        60
OIR    2025250     20200   16.9800  142.5800      10.1        73       132        60
OIR    2025250     20200   16.9800  142.5600      10.0        74       128        60
OIR    2025250     20200   16.9800  142.5400      10.0        74       123        60
OIR    2025250     20200   16.9800  142.5200      10.0        75       123        60
OIR    2025250     20200   16.9800  142.5000      10.0        75       128        60
OIR    2025250     20200   16.9800  142.4800      10.0        76       119        60
OIR    2025250     20200   16.9800  142.4600      10.0        76       123        60
OIR    2025250     20200   16.9800  142.4400      10.0        77       123        60
OIR    2025250     20200   16.9800  142.4200      10.0        78       123        60
OIR    2025250     20200   16.9800  142.4000      10.0        78       123        60
OIR    2025250     20200   16.9800  142.3800      10.0        79       123        60
OIR    2025250     20200   16.9800  142.3600      10.1        80       123        60
OIR    2025250     20200   16.9800  142.3400      10.2        82       119        60
OIR    2025250     20200   16.9800  142.3200      10.2        83       123        60
OIR    2025250     20200   16.9800  142.3000      10.3        86       115        60
OIR    2025250     20200   16.9800  142.2800      10.4        87       115        60
OIR    2025250     20200   16.9800  142.2600      10.4        88       111        60
OIR    2025250     20200   16.9800  142.2400      10.4        88       111        60
OIR    2025250     20200   16.9800  142.2200      10.4        89       111        60
OIR    2025250     20200   16.9800  142.2000      10.4        89       115        60
OIR    2025250     20200   16.9800  142.1800      10.3        90       111        60
OIR    2025250     20200   16.9800  142.1600      10.1        93       115        60
OIR    2025250     20200   16.9800  142.1400       9.9        98       111        60
OIR    2025250     20200   16.9800  142.1200       9.9       102       111        60
OIR    2025250     20200   16.9800  142.1000       9.8       106       111        60
OIR    2025250     20200   16.9800  142.0800       9.9       109       111        60
OIR    2025250     20200   16.9800  142.0600       9.9       111       115        60
OIR    2025250     20200   16.9800  142.0400       9.9       112       123        60
OIR    2025250     20200   16.9800  142.0200       9.9       113       115        60
OIR    2025250     20200   16.9800  142.0000       9.9       114       115        60
OIR    2025250     20200   16.9800  141.9800       9.9       114       123        60
OIR    2025250     20200   16.9800  141.9600      10.0       115       123        60
OIR    2025250     20200   16.9800  141.9400      10.0       115       123        60
OIR    2025250     20200   16.9800  141.9200      10.0       116       123        60
OIR    2025250     20200   16.9800  141.9000      10.0       116       123        60
OIR    2025250     20200   16.9800  141.8800      10.0       117       115        60
OIR    2025250     20200   16.9800  141.8600       9.8       119       128        60
OIR    2025250     20200   16.9800  141.8400       9.8       122       128        60
OIR    2025250     20200   16.9800  141.8200       9.7       125       123        60
OIR    2025250     20200   16.9800  141.8000       9.7       130       123        60
OIR    2025250     20200   16.9800  141.7800       9.8       134       123        60
OIR    2025250     20200   16.9800  141.7600       9.9       137       123        60
OIR    2025250     20200   16.9800  141.7400      10.0       138       128        60
OIR    2025250     20200   16.9600  142.6600      10.2        70       128        60
OIR    2025250     20200   16.9600  142.6400      10.1        71       128        60
OIR    2025250     20200   16.9600  142.6200      10.0        71       123        60
OIR    2025250     20200   16.9600  142.6000      10.0        72       132        60
OIR    2025250     20200   16.9600  142.5800      10.0        73       128        60
OIR    2025250     20200   16.9600  142.5600      10.0        73       128        60
OIR    2025250     20200   16.9600  142.5400      10.0        74       119        60
OIR    2025250     20200   16.9600  142.5200      10.0        75       123        60
OIR    2025250     20200   16.9600  142.5000      10.0        75       115        60
OIR    2025250     20200   16.9600  142.4800      10.0        76       119        60
OIR    2025250     20200   16.9600  142.4600      10.0        77       119        60
OIR    2025250     20200   16.9600  142.4400      10.0        77       119        60
OIR    2025250     20200   16.9600  142.4200      10.0        78       115        60
OIR    2025250     20200   16.9600  142.4000      10.0        78       115        60
OIR    2025250     20200   16.9600  142.3800      10.0        79       119        60
OIR    2025250     20200   16.9600  142.3600      10.0        80       115        60
OIR    2025250     20200   16.9600  142.3400      10.0        81       115        60
OIR    2025250     20200   16.9600  142.3200      10.1        82       115        60
OIR    2025250     20200   16.9600  142.3000      10.2        85       119        60
OIR    2025250     20200   16.9600  142.2800      10.3        86       111        60
OIR    2025250     20200   16.9600  142.2600      10.3        88       115        60
OIR    2025250     20200   16.9600  142.2400      10.4        88       107        60
OIR    2025250     20200   16.9600  142.2200      10.4        89       111        60
OIR    2025250     20200   16.9600  142.2000      10.4        89       111        60
OIR    2025250     20200   16.9600  142.1800      10.2        92       111        60
OIR    2025250     20200   16.9600  142.1600      10.0        96       111        60
OIR    2025250     20200   16.9600  142.1400       9.9       101       115        60
OIR    2025250     20200   16.9600  142.1200       9.9       105       115        60
OIR    2025250     20200   16.9600  142.1000       9.9       109       115        60
OIR    2025250     20200   16.9600  142.0800       9.9       111       115        60
OIR    2025250     20200   16.9600  142.0600       9.9       113       111        60
OIR    2025250     20200   16.9600  142.0400       9.9       114       111        60
OIR    2025250     20200   16.9600  142.0200       9.9       114       115        60
OIR    2025250     20200   16.9600  142.0000       9.9       115       115        60
OIR    2025250     20200   16.9600  141.9800       9.9       115       115        60
OIR    2025250     20200   16.9600  141.9600       9.9       116       119        60
OIR    2025250     20200   16.9600  141.9400       9.9       116       119        60
OIR    2025250     20200   16.9600  141.9200       9.9       117       119        60
OIR    2025250     20200   16.9600  141.9000       9.8       119       119        60
OIR    2025250     20200   16.9600  141.8800       9.7       121       123        60
OIR    2025250     20200   16.9600  141.8600       9.6       124       119        60
OIR    2025250     20200   16.9600  141.8400       9.5       128       119        60
OIR    2025250     20200   16.9600  141.8200       9.5       131       119        60
OIR    2025250     20200   16.9600  141.8000       9.5       134       119        60
OIR    2025250     20200   16.9600  141.7800       9.7       138       119        60
OIR    2025250     20200   16.9600  141.7600       9.8       139       123        60
OIR    2025250     20200   16.9600  141.7400       9.9       140       128        60
OIR    2025250     20200   16.9400  142.6800      10.1        70       136        60
OIR    2025250     20200   16.9400  142.6600      10.0        70       132        60
OIR    2025250     20200   16.9400  142.6400       9.9        71       123        60
OIR    2025250     20200   16.9400  142.6200       9.9        71       128        60
OIR    2025250     20200   16.9400  142.6000       9.9        72       132        60
OIR    2025250     20200   16.9400  142.5800       9.9        73       128        60
OIR    2025250     20200   16.9400  142.5600       9.9        73       132        60
OIR    2025250     20200   16.9400  142.5400       9.9        74       128        60
OIR    2025250     20200   16.9400  142.5200       9.9        75       128        60
OIR    2025250     20200   16.9400  142.5000       9.9        76       119        60
OIR    2025250     20200   16.9400  142.4800       9.9        76       119        60
OIR    2025250     20200   16.9400  142.4600       9.9        77       123        60
OIR    2025250     20200   16.9400  142.4400       9.9        77       123        60
OIR    2025250     20200   16.9400  142.4200       9.9        78       123        60
OIR    2025250     20200   16.9400  142.4000       9.9        78       115        60
OIR    2025250     20200   16.9400  142.3800       9.9        79       119        60
OIR    2025250     20200   16.9400  142.3600      10.0        79       119        60
OIR    2025250     20200   16.9400  142.3400      10.0        81       111        60
OIR    2025250     20200   16.9400  142.3200      10.0        82       119        60
OIR    2025250     20200   16.9400  142.3000      10.1        84       111        60
OIR    2025250     20200   16.9400  142.2800      10.2        86       119        60
OIR    2025250     20200   16.9400  142.2600      10.3        87       119        60
OIR    2025250     20200   16.9400  142.2400      10.3        88       115        60
OIR    2025250     20200   16.9400  142.2200      10.3        89       111        60
OIR    2025250     20200   16.9400  142.2000      10.3        89       115        60
OIR    2025250     20200   16.9400  142.1800      10.2        94       119        60
OIR    2025250     20200   16.9400  142.1600      10.0       101       115        60
OIR    2025250     20200   16.9400  142.1400       9.9       105       119        60
OIR    2025250     20200   16.9400  142.1200       9.9       108       119        60
OIR    2025250     20200   16.9400  142.1000       9.9       111       123        60
OIR    2025250     20200   16.9400  142.0800       9.9       113       123        60
OIR    2025250     20200   16.9400  142.0600       9.9       114       115        60
OIR    2025250     20200   16.9400  142.0400       9.9       115       123        60
OIR    2025250     20200   16.9400  142.0200       9.8       116       128        60
OIR    2025250     20200   16.9400  142.0000       9.8       117       123        60
OIR    2025250     20200   16.9400  141.9800       9.7       119       115        60
OIR    2025250     20200   16.9400  141.9600       9.7       120       123        60
OIR    2025250     20200   16.9400  141.9400       9.6       122       128        60
OIR    2025250     20200   16.9400  141.9200       9.5       124       128        60
OIR    2025250     20200   16.9400  141.9000       9.4       128       128        60
OIR    2025250     20200   16.9400  141.8800       9.3       131       128        60
OIR    2025250     20200   16.9400  141.8600       9.3       132       128        60
OIR    2025250     20200   16.9400  141.8400       9.3       134       128        60
OIR    2025250     20200   16.9400  141.8200       9.4       136       132        60
OIR    2025250     20200   16.9400  141.8000       9.4       139       128        60
OIR    2025250     20200   16.9400  141.7800       9.6       142       128        60
OIR    2025250     20200   16.9400  141.7600       9.7       144       128        60
OIR    2025250     20200   16.9400  141.7400       9.7       146       128        60
OIR    2025250     20200   16.9400  141.7200       9.7       149       128        60
OIR    2025250     20200   16.9200  142.7000      10.0        69       136        60
OIR    2025250     20200   16.9200  142.6800       9.9        69       128        60
OIR    2025250     20200   16.9200  142.6600       9.8        70       132        60
OIR    2025250     20200   16.9200  142.6400       9.8        70       136        60
OIR    2025250     20200   16.9200  142.6200       9.7        71       128        60
OIR    2025250     20200   16.9200  142.6000       9.7        72       128        60
OIR    2025250     20200   16.9200  142.5800       9.7        72       128        60
OIR    2025250     20200   16.9200  142.5600       9.7        73       128        60
OIR    2025250     20200   16.9200  142.5400       9.8        74       123        60
OIR    2025250     20200   16.9200  142.5200       9.8        75       123        60
OIR    2025250     20200   16.9200  142.5000       9.8        76       123        60
OIR    2025250     20200   16.9200  142.4800       9.9        76       123        60
OIR    2025250     20200   16.9200  142.4600       9.9        77       123        60
OIR    2025250     20200   16.9200  142.4400       9.9        77       123        60
OIR    2025250     20200   16.9200  142.4200       9.9        78       119        60
OIR    2025250     20200   16.9200  142.4000       9.9        78       123        60
OIR    2025250     20200   16.9200  142.3800       9.9        79       111        60
OIR    2025250     20200   16.9200  142.3600       9.9        80       119        60
OIR    2025250     20200   16.9200  142.3400      10.0        81       119        60
OIR    2025250     20200   16.9200  142.3200      10.0        83       119        60
OIR    2025250     20200   16.9200  142.3000      10.1        84       111        60
OIR    2025250     20200   16.9200  142.2800      10.2        86       119        60
OIR    2025250     20200   16.9200  142.2600      10.2        87       115        60
OIR    2025250     20200   16.9200  142.2400      10.3        88       111        60
OIR    2025250     20200   16.9200  142.2200      10.3        88       119        60
OIR    2025250     20200   16.9200  142.2000      10.2        89       111        60
OIR    2025250     20200   16.9200  142.1800      10.0        96       123        60
OIR    2025250     20200   16.9200  142.1600      10.0       104       123        60
OIR    2025250     20200   16.9200  142.1400      10.0       107       123        60
OIR    2025250     20200   16.9200  142.1200      10.0       110       115        60
OIR    2025250     20200   16.9200  142.1000       9.9       113       119        60
OIR    2025250     20200   16.9200  142.0800       9.9       115       119        60
OIR    2025250     20200   16.9200  142.0600       9.9       117       123        60
OIR    2025250     20200   16.9200  142.0400       9.8       118       119        60
OIR    2025250     20200   16.9200  142.0200       9.8       119       119        60
OIR    2025250     20200   16.9200  142.0000       9.7       121       128        60
OIR    2025250     20200   16.9200  141.9800       9.6       123       123        60
OIR    2025250     20200   16.9200  141.9600       9.4       126       123        60
OIR    2025250     20200   16.9200  141.9400       9.2       129       128        60
OIR    2025250     20200   16.9200  141.9200       9.1       133       128        60
OIR    2025250     20200   16.9200  141.9000       9.1       137       128        60
OIR    2025250     20200   16.9200  141.8800       9.1       140       128        60
OIR    2025250     20200   16.9200  141.8600       9.2       142       128        60
OIR    2025250     20200   16.9200  141.8400       9.2       141       128        60
OIR    2025250     20200   16.9200  141.8200       9.3       142       132        60
OIR    2025250     20200   16.9200  141.8000       9.3       144       128        60
OIR    2025250     20200   16.9200  141.7800       9.4       147       132        60
OIR    2025250     20200   16.9200  141.7600       9.6       150       128        60
OIR    2025250     20200   16.9200  141.7400       9.6       154       128        60
OIR    2025250     20200   16.9200  141.7200       9.6       156       128        60
OIR    2025250     20200   16.9000  142.7000       9.8        68       132        60
OIR    2025250     20200   16.9000  142.6800       9.6        69       132        60
OIR    2025250     20200   16.9000  142.6600       9.6        69       136        60
OIR    2025250     20200   16.9000  142.6400       9.6        70       132        60
OIR    2025250     20200   16.9000  142.6200       9.6        71       132        60
OIR    2025250     20200   16.9000  142.6000       9.6        71       132        60
OIR    2025250     20200   16.9000  142.5800       9.6        72       132        60
OIR    2025250     20200   16.9000  142.5600       9.6        73       123        60
OIR    2025250     20200   16.9000  142.5400       9.7        74       128        60
OIR    2025250     20200   16.9000  142.5200       9.7        75       128        60
OIR    2025250     20200   16.9000  142.5000       9.8        76       123        60
OIR    2025250     20200   16.9000  142.4800       9.8        77       119        60
OIR    2025250     20200   16.9000  142.4600       9.8        77       123        60
OIR    2025250     20200   16.9000  142.4400       9.8        78       119        60
OIR    2025250     20200   16.9000  142.4200       9.9        78       119        60
OIR    2025250     20200   16.9000  142.4000       9.9        78       111        60
OIR    2025250     20200   16.9000  142.3800       9.9        79       119        60
OIR    2025250     20200   16.9000  142.3600       9.9        80       119        60
OIR    2025250     20200   16.9000  142.3400      10.0        81       111        60
OIR    2025250     20200   16.9000  142.3200      10.1        83       111        60
OIR    2025250     20200   16.9000  142.3000      10.1        84       115        60
OIR    2025250     20200   16.9000  142.2800      10.2        85       115        60
OIR    2025250     20200   16.9000  142.2600      10.2        87       119        60
OIR    2025250     20200   16.9000  142.2400      10.3        88       111        60
OIR    2025250     20200   16.9000  142.2200      10.2        88       115        60
OIR    2025250     20200   16.9000  142.2000      10.2        89       119        60
OIR    2025250     20200   16.9000  142.1800      10.0        96       123        60
OIR    2025250     20200   16.9000  142.1600      10.0       105       123        60
OIR    2025250     20200   16.9000  142.1400      10.0       108       123        60
OIR    2025250     20200   16.9000  142.1200      10.0       111       128        60
OIR    2025250     20200   16.9000  142.1000      10.0       114       115        60
OIR    2025250     20200   16.9000  142.0800       9.9       116       115        60
OIR    2025250     20200   16.9000  142.0600       9.9       118       119        60
OIR    2025250     20200   16.9000  142.0400       9.8       120       123        60
OIR    2025250     20200   16.9000  142.0200       9.6       123       123        60
OIR    2025250     20200   16.9000  142.0000       9.5       126       115        60
OIR    2025250     20200   16.9000  141.9800       9.4       129       123        60
OIR    2025250     20200   16.9000  141.9600       9.2       132       123        60
OIR    2025250     20200   16.9000  141.9400       9.1       136       123        60
OIR    2025250     20200   16.9000  141.9200       9.1       140       119        60
OIR    2025250     20200   16.9000  141.9000       9.1       143       115        60
OIR    2025250     20200   16.9000  141.8800       9.1       145       128        60
OIR    2025250     20200   16.9000  141.8600       9.2       147       123        60
OIR    2025250     20200   16.9000  141.8400       9.2       149       123        60
OIR    2025250     20200   16.9000  141.8200       9.2       149       128        60
OIR    2025250     20200   16.9000  141.8000       9.3       151       123        60
OIR    2025250     20200   16.9000  141.7800       9.4       153       128        60
OIR    2025250     20200   16.9000  141.7600       9.5       156       128        60
OIR    2025250     20200   16.9000  141.7400       9.5       158       132        60
OIR    2025250     20200   16.9000  141.7200       9.6       159       123        60
OIR    2025250     20200   16.8800  142.7400       9.7        66       132        60
OIR    2025250     20200   16.8800  142.7200       9.5        67       136        60
OIR    2025250     20200   16.8800  142.7000       9.4        67       132        60
OIR    2025250     20200   16.8800  142.6800       9.3        68       128        60
OIR    2025250     20200   16.8800  142.6600       9.3        69       128        60
OIR    2025250     20200   16.8800  142.6400       9.3        69       123        60
OIR    2025250     20200   16.8800  142.6200       9.4        70       128        60
OIR    2025250     20200   16.8800  142.6000       9.4        71       132        60
OIR    2025250     20200   16.8800  142.5800       9.5        72       128        60
OIR    2025250     20200   16.8800  142.5600       9.5        73       128        60
OIR    2025250     20200   16.8800  142.5400       9.6        74       123        60
OIR    2025250     20200   16.8800  142.5200       9.7        75       119        60
OIR    2025250     20200   16.8800  142.5000       9.7        76       123        60
OIR    2025250     20200   16.8800  142.4800       9.7        77       123        60
OIR    2025250     20200   16.8800  142.4600       9.8        77       111        60
OIR    2025250     20200   16.8800  142.4400       9.8        78       111        60
OIR    2025250     20200   16.8800  142.4200       9.8        78       119        60
OIR    2025250     20200   16.8800  142.4000       9.8        79       119        60
OIR    2025250     20200   16.8800  142.3800       9.8        79       119        60
OIR    2025250     20200   16.8800  142.3600       9.9        80       111        60
OIR    2025250     20200   16.8800  142.3400      10.0        82       111        60
OIR    2025250     20200   16.8800  142.3200      10.1        84       111        60
OIR    2025250     20200   16.8800  142.3000      10.2        84       111        60
OIR    2025250     20200   16.8800  142.2800      10.2        85       115        60
OIR    2025250     20200   16.8800  142.2600      10.2        85       111        60
OIR    2025250     20200   16.8800  142.2400      10.2        85       115        60
OIR    2025250     20200   16.8800  142.2200      10.2        88       119        60
OIR    2025250     20200   16.8800  142.2000      10.1        89       119        60
OIR    2025250     20200   16.8800  142.1800       9.9        98       115        60
OIR    2025250     20200   16.8800  142.1600      10.1       106       119        60
OIR    2025250     20200   16.8800  142.1400      10.1       109       128        60
OIR    2025250     20200   16.8800  142.1200      10.1       111       115        60
OIR    2025250     20200   16.8800  142.1000      10.0       116       123        60
OIR    2025250     20200   16.8800  142.0800      10.0       119       115        60
OIR    2025250     20200   16.8800  142.0600       9.8       121       128        60
OIR    2025250     20200   16.8800  142.0400       9.7       124       123        60
OIR    2025250     20200   16.8800  142.0200       9.4       129       128        60
OIR    2025250     20200   16.8800  142.0000       9.3       133       132        60
OIR    2025250     20200   16.8800  141.9800       9.3       137       123        60
OIR    2025250     20200   16.8800  141.9600       9.2       140       128        60
OIR    2025250     20200   16.8800  141.9400       9.2       142       123        60
OIR    2025250     20200   16.8800  141.9200       9.1       144       123        60
OIR    2025250     20200   16.8800  141.9000       9.1       146       115        60
OIR    2025250     20200   16.8800  141.8800       9.2       148       123        60
OIR    2025250     20200   16.8800  141.8600       9.2       150       115        60
OIR    2025250     20200   16.8800  141.8400       9.2       153       128        60
OIR    2025250     20200   16.8800  141.8200       9.3       155       115        60
OIR    2025250     20200   16.8800  141.8000       9.4       156       132        60
OIR    2025250     20200   16.8800  141.7800       9.4       158       123        60
OIR    2025250     20200   16.8800  141.7600       9.5       159       128        60
OIR    2025250     20200   16.8800  141.7400       9.5       159       128        60
OIR    2025250     20200   16.8800  141.7200       9.6       160       128        60
OIR    2025250     20200   16.8800  141.7000       9.6       160       132        60
OIR    2025250     20200   16.8800  141.6800       9.7       161       132        60
OIR    2025250     20200   16.8600  142.7400       9.4        65       136        60
OIR    2025250     20200   16.8600  142.7200       9.2        66       132        60
OIR    2025250     20200   16.8600  142.7000       9.1        67       136        60
OIR    2025250     20200   16.8600  142.6800       9.1        67       132        60
OIR    2025250     20200   16.8600  142.6600       9.0        68       128        60
OIR    2025250     20200   16.8600  142.6400       9.1        69       123        60
OIR    2025250     20200   16.8600  142.6200       9.1        70       128        60
OIR    2025250     20200   16.8600  142.6000       9.2        71       123        60
OIR    2025250     20200   16.8600  142.5800       9.3        72       123        60
OIR    2025250     20200   16.8600  142.5600       9.5        73       128        60
OIR    2025250     20200   16.8600  142.5400       9.6        74       119        60
OIR    2025250     20200   16.8600  142.5200       9.6        75       123        60
OIR    2025250     20200   16.8600  142.5000       9.7        76       123        60
OIR    2025250     20200   16.8600  142.4800       9.7        77       111        60
OIR    2025250     20200   16.8600  142.4600       9.8        78       111        60
OIR    2025250     20200   16.8600  142.4400       9.8        78       111        60
OIR    2025250     20200   16.8600  142.4200       9.8        78       115        60
OIR    2025250     20200   16.8600  142.4000       9.9        79       115        60
OIR    2025250     20200   16.8600  142.3800       9.9        80       115        60
OIR    2025250     20200   16.8600  142.3600      10.0        82       111        60
OIR    2025250     20200   16.8600  142.3400      10.1        84       111        60
OIR    2025250     20200   16.8600  142.3200      10.2        84       115        60
OIR    2025250     20200   16.8600  142.3000      10.2        84       111        60
OIR    2025250     20200   16.8600  142.2800      10.1        84       111        60
OIR    2025250     20200   16.8600  142.2600      10.1        83       119        60
OIR    2025250     20200   16.8600  142.2400      10.1        84       119        60
OIR    2025250     20200   16.8600  142.2200      10.0        85       115        60
OIR    2025250     20200   16.8600  142.2000       9.9        89       123        60
OIR    2025250     20200   16.8600  142.1800      10.1       105       123        60
OIR    2025250     20200   16.8600  142.1600      10.3       108       128        60
OIR    2025250     20200   16.8600  142.1400      10.3       109       123        60
OIR    2025250     20200   16.8600  142.1200      10.1       111       123        60
OIR    2025250     20200   16.8600  142.1000       9.9       118       123        60
OIR    2025250     20200   16.8600  142.0800       9.9       121       123        60
OIR    2025250     20200   16.8600  142.0600       9.6       125       115        60
OIR    2025250     20200   16.8600  142.0400       9.4       131       128        60
OIR    2025250     20200   16.8600  142.0200       9.3       137       132        60
OIR    2025250     20200   16.8600  142.0000       9.3       140       128        60
OIR    2025250     20200   16.8600  141.9800       9.3       142       128        60
OIR    2025250     20200   16.8600  141.9600       9.3       144       128        60
OIR    2025250     20200   16.8600  141.9400       9.2       145       128        60
OIR    2025250     20200   16.8600  141.9200       9.2       146       123        60
OIR    2025250     20200   16.8600  141.9000       9.2       148       128        60
OIR    2025250     20200   16.8600  141.8800       9.2       150       123        60
OIR    2025250     20200   16.8600  141.8600       9.2       153       115        60
OIR    2025250     20200   16.8600  141.8400       9.3       155       115        60
OIR    2025250     20200   16.8600  141.8200       9.3       157       123        60
OIR    2025250     20200   16.8600  141.8000       9.4       158       128        60
OIR    2025250     20200   16.8600  141.7800       9.4       159       128        60
OIR    2025250     20200   16.8600  141.7600       9.5       160       107        60
OIR    2025250     20200   16.8600  141.7400       9.5       160       128        60
OIR    2025250     20200   16.8600  141.7200       9.6       160       128        60
OIR    2025250     20200   16.8600  141.7000       9.6       161       132        60
OIR    2025250     20200   16.8600  141.6800       9.7       162       136        60
OIR    2025250     20200   16.8400  142.7400       9.2        65       132        60
OIR    2025250     20200   16.8400  142.7200       9.0        65       132        60
OIR    2025250     20200   16.8400  142.7000       8.9        66       132        60
OIR    2025250     20200   16.8400  142.6800       8.9        67       128        60
OIR    2025250     20200   16.8400  142.6600       8.8        67       128        60
OIR    2025250     20200   16.8400  142.6400       8.9        68       128        60
OIR    2025250     20200   16.8400  142.6200       8.9        69       119        60
OIR    2025250     20200   16.8400  142.6000       9.0        70       128        60
OIR    2025250     20200   16.8400  142.5800       9.2        72       123        60
OIR    2025250     20200   16.8400  142.5600       9.3        73       123        60
OIR    2025250     20200   16.8400  142.5400       9.5        75       119        60
OIR    2025250     20200   16.8400  142.5200       9.5        76       119        60
OIR    2025250     20200   16.8400  142.5000       9.6        77       119        60
OIR    2025250     20200   16.8400  142.4800       9.7        77       111        60
OIR    2025250     20200   16.8400  142.4600       9.7        78       115        60
OIR    2025250     20200   16.8400  142.4400       9.8        78       119        60
OIR    2025250     20200   16.8400  142.4200       9.8        79       115        60
OIR    2025250     20200   16.8400  142.4000       9.9        80       119        60
OIR    2025250     20200   16.8400  142.3800      10.0        81       111        60
OIR    2025250     20200   16.8400  142.3600      10.1        83       115        60
OIR    2025250     20200   16.8400  142.3400      10.2        84       115        60
OIR    2025250     20200   16.8400  142.3200      10.2        84       119        60
OIR    2025250     20200   16.8400  142.3000      10.2        84       119        60
OIR    2025250     20200   16.8400  142.2800      10.2        83       123        60
OIR    2025250     20200   16.8400  142.2600      10.2        83       115        60
OIR    2025250     20200   16.8400  142.2400      10.1        83       119        60
OIR    2025250     20200   16.8400  142.2200      10.0        84       123        60
OIR    2025250     20200   16.8400  142.2000       9.8        90       128        60
OIR    2025250     20200   16.8400  142.1800      10.3       107       123        60
OIR    2025250     20200   16.8400  142.1600      10.4       109       132        60
OIR    2025250     20200   16.8400  142.1400      10.4       110       128        60
OIR    2025250     20200   16.8400  142.1200      10.1       114       132        60
OIR    2025250     20200   16.8400  142.1000       9.8       124       123        60
OIR    2025250     20200   16.8400  142.0800       9.8       126       123        60
OIR    2025250     20200   16.8400  142.0600       9.5       130       128        60
OIR    2025250     20200   16.8400  142.0400       9.4       137       128        60
OIR    2025250     20200   16.8400  142.0200       9.4       142       123        60
OIR    2025250     20200   16.8400  142.0000       9.4       144       128        60
OIR    2025250     20200   16.8400  141.9800       9.4       145       128        60
OIR    2025250     20200   16.8400  141.9600       9.3       146       128        60
OIR    2025250     20200   16.8400  141.9400       9.3       147       128        60
OIR    2025250     20200   16.8400  141.9200       9.3       148       107        60
OIR    2025250     20200   16.8400  141.9000       9.2       150       128        60
OIR    2025250     20200   16.8400  141.8800       9.2       152       119        60
OIR    2025250     20200   16.8400  141.8600       9.2       155       123        60
OIR    2025250     20200   16.8400  141.8400       9.3       157       123        60
OIR    2025250     20200   16.8400  141.8200       9.3       158       115        60
OIR    2025250     20200   16.8400  141.8000       9.4       159       123        60
OIR    2025250     20200   16.8400  141.7800       9.4       160       123        60
OIR    2025250     20200   16.8400  141.7600       9.5       160       123        60
OIR    2025250     20200   16.8400  141.7400       9.5       160       123        60
OIR    2025250     20200   16.8400  141.7200       9.5       161       132        60
OIR    2025250     20200   16.8400  141.7000       9.6       162       128        60
OIR    2025250     20200   16.8400  141.6800       9.7       162       132        60
OIR    2025250     20200   16.8200  142.7600       9.2        64       136        60
OIR    2025250     20200   16.8200  142.7400       9.1        64       128        60
OIR    2025250     20200   16.8200  142.7200       8.9        65       132        60
OIR    2025250     20200   16.8200  142.7000       8.8        65       128        60
OIR    2025250     20200   16.8200  142.6800       8.7        66       128        60
OIR    2025250     20200   16.8200  142.6600       8.7        67       128        60
OIR    2025250     20200   16.8200  142.6400       8.7        67       123        60
OIR    2025250     20200   16.8200  142.6200       8.8        68       128        60
OIR    2025250     20200   16.8200  142.6000       8.9        69       123        60
OIR    2025250     20200   16.8200  142.5800       9.0        71       119        60
OIR    2025250     20200   16.8200  142.5600       9.2        73       123        60
OIR    2025250     20200   16.8200  142.5400       9.4        75       119        60
OIR    2025250     20200   16.8200  142.5200       9.5        76       123        60
OIR    2025250     20200   16.8200  142.5000       9.6        77       119        60
OIR    2025250     20200   16.8200  142.4800       9.6        78       119        60
OIR    2025250     20200   16.8200  142.4600       9.7        78       115        60
OIR    2025250     20200   16.8200  142.4400       9.7        79       111        60
OIR    2025250     20200   16.8200  142.4200       9.8        79       111        60
OIR    2025250     20200   16.8200  142.4000       9.9        80       111        60
OIR    2025250     20200   16.8200  142.3800      10.0        82       115        60
OIR    2025250     20200   16.8200  142.3600      10.1        83       119        60
OIR    2025250     20200   16.8200  142.3400      10.3        85       111        60
OIR    2025250     20200   16.8200  142.3200      10.4        85       119        60
OIR    2025250     20200   16.8200  142.3000      10.3        84       123        60
OIR    2025250     20200   16.8200  142.2800      10.2        83       119        60
OIR    2025250     20200   16.8200  142.2600      10.2        83       111        60
OIR    2025250     20200   16.8200  142.2400      10.1        84       107        60
OIR    2025250     20200   16.8200  142.2200       9.9        87       123        60
OIR    2025250     20200   16.8200  142.2000      10.2       101       132        60
OIR    2025250     20200   16.8200  142.1800      10.5       110       128        60
OIR    2025250     20200   16.8200  142.1600      10.6       111       128        60
OIR    2025250     20200   16.8200  142.1400      10.3       113       132        60
OIR    2025250     20200   16.8200  142.1200      10.1       118       132        60
OIR    2025250     20200   16.8200  142.1000       9.8       128       128        60
OIR    2025250     20200   16.8200  142.0800       9.8       132       128        60
OIR    2025250     20200   16.8200  142.0600       9.6       136       132        60
OIR    2025250     20200   16.8200  142.0400       9.5       141       128        60
OIR    2025250     20200   16.8200  142.0200       9.5       144       132        60
OIR    2025250     20200   16.8200  142.0000       9.5       145       128        60
OIR    2025250     20200   16.8200  141.9800       9.4       146       107        60
OIR    2025250     20200   16.8200  141.9600       9.4       147       128        60
OIR    2025250     20200   16.8200  141.9400       9.3       148       128        60
OIR    2025250     20200   16.8200  141.9200       9.3       150       123        60
OIR    2025250     20200   16.8200  141.9000       9.3       152       123        60
OIR    2025250     20200   16.8200  141.8800       9.3       154       115        60
OIR    2025250     20200   16.8200  141.8600       9.3       157       115        60
OIR    2025250     20200   16.8200  141.8400       9.3       158       123        60
OIR    2025250     20200   16.8200  141.8200       9.3       159       123        60
OIR    2025250     20200   16.8200  141.8000       9.4       160       119        60
OIR    2025250     20200   16.8200  141.7800       9.4       160       123        60
OIR    2025250     20200   16.8200  141.7600       9.4       160       123        60
OIR    2025250     20200   16.8200  141.7400       9.5       161       115        60
OIR    2025250     20200   16.8200  141.7200       9.5       161       107        60
OIR    2025250     20200   16.8200  141.7000       9.6       162       123        60
OIR    2025250     20200   16.8200  141.6800       9.6       163       128        60
OIR    2025250     20200   16.8000  142.7600       9.1        63       136        60
OIR    2025250     20200   16.8000  142.7400       8.9        64       132        60
OIR    2025250     20200   16.8000  142.7200       8.8        64       132        60
OIR    2025250     20200   16.8000  142.7000       8.7        65       128        60
OIR    2025250     20200   16.8000  142.6800       8.6        65       123        60
OIR    2025250     20200   16.8000  142.6600       8.5        66       123        60
OIR    2025250     20200   16.8000  142.6400       8.5        67       123        60
OIR    2025250     20200   16.8000  142.6200       8.6        68       128        60
OIR    2025250     20200   16.8000  142.6000       8.7        69       119        60
OIR    2025250     20200   16.8000  142.5800       8.9        71       123        60
OIR    2025250     20200   16.8000  142.5600       9.1        73       115        60
OIR    2025250     20200   16.8000  142.5400       9.3        75       115        60
OIR    2025250     20200   16.8000  142.5200       9.4        76       119        60
OIR    2025250     20200   16.8000  142.5000       9.5        77       111        60
OIR    2025250     20200   16.8000  142.4800       9.6        78       119        60
OIR    2025250     20200   16.8000  142.4600       9.7        79       119        60
OIR    2025250     20200   16.8000  142.4400       9.7        79       111        60
OIR    2025250     20200   16.8000  142.4200       9.7        80       115        60
OIR    2025250     20200   16.8000  142.4000       9.8        80       111        60
OIR    2025250     20200   16.8000  142.3800       9.9        81       119        60
OIR    2025250     20200   16.8000  142.3600      10.1        83       111        60
OIR    2025250     20200   16.8000  142.3400      10.5        86       119        60
OIR    2025250     20200   16.8000  142.3200      10.5        86       115        60
OIR    2025250     20200   16.8000  142.3000      10.4        84       123        60
OIR    2025250     20200   16.8000  142.2800      10.3        84       128        60
OIR    2025250     20200   16.8000  142.2600      10.3        84       132        60
OIR    2025250     20200   16.8000  142.2400      10.3        87       128        60
OIR    2025250     20200   16.8000  142.2200      10.5        92       136        60
OIR    2025250     20200   16.8000  142.2000      10.9       100       132        60
OIR    2025250     20200   16.8000  142.1800      11.0       111       132        60
OIR    2025250     20200   16.8000  142.1600      10.9       117       136        60
OIR    2025250     20200   16.8000  142.1400      10.7       122       136        60
OIR    2025250     20200   16.8000  142.1200      10.3       130       136        60
OIR    2025250     20200   16.8000  142.1000      10.1       138       140        60
OIR    2025250     20200   16.8000  142.0600       9.7       142       132        60
OIR    2025250     20200   16.8000  142.0400       9.7       144       140        60
OIR    2025250     20200   16.8000  142.0200       9.6       145       132        60
OIR    2025250     20200   16.8000  142.0000       9.5       146       132        60
OIR    2025250     20200   16.8000  141.9800       9.5       146       111        60
OIR    2025250     20200   16.8000  141.9600       9.4       148       128        60
OIR    2025250     20200   16.8000  141.9400       9.4       150       115        60
OIR    2025250     20200   16.8000  141.9200       9.3       152       123        60
OIR    2025250     20200   16.8000  141.9000       9.3       155       123        60
OIR    2025250     20200   16.8000  141.8800       9.4       157       119        60
OIR    2025250     20200   16.8000  141.8600       9.4       158       115        60
OIR    2025250     20200   16.8000  141.8400       9.4       159       123        60
OIR    2025250     20200   16.8000  141.8200       9.4       160       119        60
OIR    2025250     20200   16.8000  141.8000       9.4       160       119        60
OIR    2025250     20200   16.8000  141.7800       9.4       160       123        60
OIR    2025250     20200   16.8000  141.7600       9.4       161       115        60
OIR    2025250     20200   16.8000  141.7400       9.4       161       123        60
OIR    2025250     20200   16.8000  141.7200       9.5       162       107        60
OIR    2025250     20200   16.8000  141.7000       9.5       163       128        60
OIR    2025250     20200   16.8000  141.6800       9.6       163       128        60
OIR    2025250     20200   16.8000  141.6600       9.6       163       128        60
OIR    2025250     20200   16.7800  142.8200       9.2        61       136        60
OIR    2025250     20200   16.7800  142.8000       9.1        62       136        60
OIR    2025250     20200   16.7800  142.7800       9.0        62       132        60
OIR    2025250     20200   16.7800  142.7600       8.9        63       132        60
OIR    2025250     20200   16.7800  142.7400       8.8        63       132        60
OIR    2025250     20200   16.7800  142.7200       8.7        64       132        60
OIR    2025250     20200   16.7800  142.7000       8.5        64       128        60
OIR    2025250     20200   16.7800  142.6800       8.4        64       128        60
OIR    2025250     20200   16.7800  142.6600       8.4        65       128        60
OIR    2025250     20200   16.7800  142.6400       8.4        66       119        60
OIR    2025250     20200   16.7800  142.6200       8.4        67       123        60
OIR    2025250     20200   16.7800  142.6000       8.5        68       119        60
OIR    2025250     20200   16.7800  142.5800       8.7        70       119        60
OIR    2025250     20200   16.7800  142.5600       9.0        73       119        60
OIR    2025250     20200   16.7800  142.5400       9.3        75       119        60
OIR    2025250     20200   16.7800  142.5200       9.4        76       119        60
OIR    2025250     20200   16.7800  142.5000       9.5        77       115        60
OIR    2025250     20200   16.7800  142.4800       9.6        79       115        60
OIR    2025250     20200   16.7800  142.4600       9.7        79       119        60
OIR    2025250     20200   16.7800  142.4400       9.7        79       119        60
OIR    2025250     20200   16.7800  142.4200       9.7        80       111        60
OIR    2025250     20200   16.7800  142.4000       9.7        80       115        60
OIR    2025250     20200   16.7800  142.3800       9.8        81       115        60
OIR    2025250     20200   16.7800  142.3600       9.8        82       115        60
OIR    2025250     20200   16.7800  142.3400      10.6        87       115        60
OIR    2025250     20200   16.7800  142.3200      10.6        87       123        60
OIR    2025250     20200   16.7800  142.3000      10.8        88       123        60
OIR    2025250     20200   16.7800  142.2800      12.0        97       132        60
OIR    2025250     20200   16.7800  142.2600      12.3        99       132        60
OIR    2025250     20200   16.7800  142.2400      12.7        99       136        60
OIR    2025250     20200   16.7800  142.0800      10.1       145       132        60
OIR    2025250     20200   16.7800  142.0600      10.0       146       136        60
OIR    2025250     20200   16.7800  142.0200       9.7       147       132        60
OIR    2025250     20200   16.7800  142.0000       9.6       148       132        60
OIR    2025250     20200   16.7800  141.9800       9.5       148       128        60
OIR    2025250     20200   16.7800  141.9600       9.5       150       132        60
OIR    2025250     20200   16.7800  141.9400       9.4       152       111        60
OIR    2025250     20200   16.7800  141.9200       9.4       154       128        60
OIR    2025250     20200   16.7800  141.9000       9.4       157       123        60
OIR    2025250     20200   16.7800  141.8800       9.4       158       123        60
OIR    2025250     20200   16.7800  141.8600       9.4       159       115        60
OIR    2025250     20200   16.7800  141.8400       9.4       160       119        60
OIR    2025250     20200   16.7800  141.8200       9.4       160       115        60
OIR    2025250     20200   16.7800  141.8000       9.4       160       115        60
OIR    2025250     20200   16.7800  141.7800       9.4       161       115        60
OIR    2025250     20200   16.7800  141.7600       9.4       161       123        60
OIR    2025250     20200   16.7800  141.7400       9.4       162       111        60
OIR    2025250     20200   16.7800  141.7200       9.5       163       123        60
OIR    2025250     20200   16.7800  141.7000       9.5       163       128        60
OIR    2025250     20200   16.7800  141.6800       9.5       164       123        60
OIR    2025250     20200   16.7800  141.6600       9.6       164       107        60
OIR    2025250     20200   16.7800  141.6400       9.6       164       132        60
OIR    2025250     20200   16.7600  142.8200       9.0        60       132        60
OIR    2025250     20200   16.7600  142.8000       8.9        60       136        60
OIR    2025250     20200   16.7600  142.7800       8.8        61       136        60
OIR    2025250     20200   16.7600  142.7600       8.7        61       132        60
OIR    2025250     20200   16.7600  142.7400       8.6        62       132        60
OIR    2025250     20200   16.7600  142.7200       8.5        63       132        60
OIR    2025250     20200   16.7600  142.7000       8.4        63       128        60
OIR    2025250     20200   16.7600  142.6800       8.3        64       123        60
OIR    2025250     20200   16.7600  142.6600       8.3        64       128        60
OIR    2025250     20200   16.7600  142.6400       8.2        65       123        60
OIR    2025250     20200   16.7600  142.6200       8.3        66       132        60
OIR    2025250     20200   16.7600  142.6000       8.3        67       123        60
OIR    2025250     20200   16.7600  142.5800       8.5        70       115        60
OIR    2025250     20200   16.7600  142.5600       8.8        72       115        60
OIR    2025250     20200   16.7600  142.5400       9.1        75       119        60
OIR    2025250     20200   16.7600  142.5200       9.3        76       115        60
OIR    2025250     20200   16.7600  142.5000       9.5        78       111        60
OIR    2025250     20200   16.7600  142.4800       9.6        79       111        60
OIR    2025250     20200   16.7600  142.4600       9.7        79       119        60
OIR    2025250     20200   16.7600  142.4400       9.7        80       115        60
OIR    2025250     20200   16.7600  142.4200       9.6        79       115        60
OIR    2025250     20200   16.7600  142.4000       9.6        80       115        60
OIR    2025250     20200   16.7600  142.3800       9.6        80       119        60
OIR    2025250     20200   16.7600  142.3600       9.7        81       119        60
OIR    2025250     20200   16.7600  142.3400      10.3        85       123        60
OIR    2025250     20200   16.7600  142.3200      10.7        87       128        60
OIR    2025250     20200   16.7600  142.3000      11.0        90       136        60
OIR    2025250     20200   16.7600  142.2800      11.9        96       136        60
OIR    2025250     20200   16.7600  142.0400      10.0       148       140        60
OIR    2025250     20200   16.7600  142.0200       9.9       149       136        60
OIR    2025250     20200   16.7600  142.0000       9.8       150       136        60
OIR    2025250     20200   16.7600  141.9800       9.6       150       132        60
OIR    2025250     20200   16.7600  141.9600       9.5       151       132        60
OIR    2025250     20200   16.7600  141.9400       9.5       153       132        60
OIR    2025250     20200   16.7600  141.9200       9.4       156       128        60
OIR    2025250     20200   16.7600  141.9000       9.4       158       123        60
OIR    2025250     20200   16.7600  141.8800       9.4       159       123        60
OIR    2025250     20200   16.7600  141.8600       9.4       160       123        60
OIR    2025250     20200   16.7600  141.8400       9.4       160       115        60
OIR    2025250     20200   16.7600  141.8200       9.4       160       115        60
OIR    2025250     20200   16.7600  141.8000       9.4       161       115        60
OIR    2025250     20200   16.7600  141.7800       9.4       161       123        60
OIR    2025250     20200   16.7600  141.7600       9.4       162       115        60
OIR    2025250     20200   16.7600  141.7400       9.4       162       123        60
OIR    2025250     20200   16.7600  141.7200       9.4       163       123        60
OIR    2025250     20200   16.7600  141.7000       9.5       164       103        60
OIR    2025250     20200   16.7600  141.6800       9.5       164       103        60
OIR    2025250     20200   16.7600  141.6600       9.6       164       123        60
OIR    2025250     20200   16.7600  141.6400       9.6       164       123        60
OIR    2025250     20200   16.7600  141.6200       9.6       164       132        60
OIR    2025250     20200   16.7400  142.8200       8.8        58       132        60
OIR    2025250     20200   16.7400  142.8000       8.6        59       140        60
OIR    2025250     20200   16.7400  142.7800       8.5        59       136        60
OIR    2025250     20200   16.7400  142.7600       8.4        60       132        60
OIR    2025250     20200   16.7400  142.7400       8.4        60       132        60
OIR    2025250     20200   16.7400  142.7200       8.3        61       132        60
OIR    2025250     20200   16.7400  142.7000       8.2        62       128        60
OIR    2025250     20200   16.7400  142.6800       8.1        63       128        60
OIR    2025250     20200   16.7400  142.6600       8.1        63       132        60
OIR    2025250     20200   16.7400  142.6400       8.1        64       123        60
OIR    2025250     20200   16.7400  142.6200       8.1        65       123        60
OIR    2025250     20200   16.7400  142.6000       8.2        67       119        60
OIR    2025250     20200   16.7400  142.5800       8.3        69       123        60
OIR    2025250     20200   16.7400  142.5600       8.5        71       119        60
OIR    2025250     20200   16.7400  142.5400       8.8        74       111        60
OIR    2025250     20200   16.7400  142.5200       9.1        76       111        60
OIR    2025250     20200   16.7400  142.5000       9.4        78       115        60
OIR    2025250     20200   16.7400  142.4800       9.6        79       111        60
OIR    2025250     20200   16.7400  142.4600       9.6        79       111        60
OIR    2025250     20200   16.7400  142.4400       9.5        79       115        60
OIR    2025250     20200   16.7400  142.4200       9.5        79       111        60
OIR    2025250     20200   16.7400  142.4000       9.6        80       115        60
OIR    2025250     20200   16.7400  142.3800       9.6        80       111        60
OIR    2025250     20200   16.7400  142.3600       9.6        81       128        60
OIR    2025250     20200   16.7400  142.3400       9.7        82       123        60
OIR    2025250     20200   16.7400  142.0200      10.0       149       140        60
OIR    2025250     20200   16.7400  142.0000       9.8       152       136        60
OIR    2025250     20200   16.7400  141.9800       9.7       153       132        60
OIR    2025250     20200   16.7400  141.9600       9.5       154       132        60
OIR    2025250     20200   16.7400  141.9400       9.5       155       132        60
OIR    2025250     20200   16.7400  141.9200       9.5       157       115        60
OIR    2025250     20200   16.7400  141.9000       9.4       159       128        60
OIR    2025250     20200   16.7400  141.8800       9.4       159       115        60
OIR    2025250     20200   16.7400  141.8600       9.4       160       111        60
OIR    2025250     20200   16.7400  141.8400       9.4       160       123        60
OIR    2025250     20200   16.7400  141.8200       9.4       160       115        60
OIR    2025250     20200   16.7400  141.8000       9.4       161       119        60
OIR    2025250     20200   16.7400  141.7800       9.4       162       111        60
OIR    2025250     20200   16.7400  141.7600       9.4       162       111        60
OIR    2025250     20200   16.7400  141.7400       9.4       163       111        60
OIR    2025250     20200   16.7400  141.7200       9.4       163       111        60
OIR    2025250     20200   16.7400  141.7000       9.5       164       111        60
OIR    2025250     20200   16.7400  141.6800       9.5       164       103        60
OIR    2025250     20200   16.7400  141.6600       9.5       164       123        60
OIR    2025250     20200   16.7400  141.6400       9.5       165       123        60
OIR    2025250     20200   16.7400  141.6200       9.6       165       128        60
OIR    2025250     20200   16.7400  141.6000       9.6       165       128        60
OIR    2025250     20200   16.7200  142.8200       8.5        57       132        60
OIR    2025250     20200   16.7200  142.8000       8.4        57       132        60
OIR    2025250     20200   16.7200  142.7800       8.3        57       132        60
OIR    2025250     20200   16.7200  142.7600       8.3        58       132        60
OIR    2025250     20200   16.7200  142.7400       8.2        59       132        60
OIR    2025250     20200   16.7200  142.7200       8.1        60       132        60
OIR    2025250     20200   16.7200  142.7000       8.0        61       128        60
OIR    2025250     20200   16.7200  142.6800       8.0        62       123        60
OIR    2025250     20200   16.7200  142.6600       8.0        63       123        60
OIR    2025250     20200   16.7200  142.6400       8.0        64       128        60
OIR    2025250     20200   16.7200  142.6200       8.0        65       123        60
OIR    2025250     20200   16.7200  142.6000       8.1        66       123        60
OIR    2025250     20200   16.7200  142.5800       8.2        68       115        60
OIR    2025250     20200   16.7200  142.5600       8.3        71       119        60
OIR    2025250     20200   16.7200  142.5400       8.6        73       119        60
OIR    2025250     20200   16.7200  142.5200       8.9        75       111        60
OIR    2025250     20200   16.7200  142.5000       9.3        78       111        60
OIR    2025250     20200   16.7200  142.4800       9.5        79       111        60
OIR    2025250     20200   16.7200  142.4600       9.5        79       111        60
OIR    2025250     20200   16.7200  142.4400       9.4        79       119        60
OIR    2025250     20200   16.7200  142.4200       9.5        79       115        60
OIR    2025250     20200   16.7200  142.4000       9.5        80       119        60
OIR    2025250     20200   16.7200  142.3800       9.5        80       123        60
OIR    2025250     20200   16.7200  142.3600       9.7        82       132        60
OIR    2025250     20200   16.7200  141.9800       9.7       155       132        60
OIR    2025250     20200   16.7200  141.9600       9.6       156       111        60
OIR    2025250     20200   16.7200  141.9400       9.5       157       132        60
OIR    2025250     20200   16.7200  141.9200       9.5       158       115        60
OIR    2025250     20200   16.7200  141.9000       9.5       159       115        60
OIR    2025250     20200   16.7200  141.8800       9.4       160       123        60
OIR    2025250     20200   16.7200  141.8600       9.4       160       115        60
OIR    2025250     20200   16.7200  141.8400       9.4       160       119        60
OIR    2025250     20200   16.7200  141.8200       9.4       161       119        60
OIR    2025250     20200   16.7200  141.8000       9.3       161       115        60
OIR    2025250     20200   16.7200  141.7800       9.3       162       111        60
OIR    2025250     20200   16.7200  141.7600       9.3       163       111        60
OIR    2025250     20200   16.7200  141.7400       9.4       164       115        60
OIR    2025250     20200   16.7200  141.7200       9.4       164       111        60
OIR    2025250     20200   16.7200  141.7000       9.4       164       119        60
OIR    2025250     20200   16.7200  141.6800       9.5       164       103        60
OIR    2025250     20200   16.7200  141.6600       9.5       165       103        60
OIR    2025250     20200   16.7200  141.6400       9.5       165       119        60
OIR    2025250     20200   16.7200  141.6200       9.5       165       128        60
OIR    2025250     20200   16.7200  141.6000       9.6       165       128        60
OIR    2025250     20200   16.7000  142.8200       8.3        55       136        60
OIR    2025250     20200   16.7000  142.8000       8.3        56       132        60
OIR    2025250     20200   16.7000  142.7800       8.2        56       140        60
OIR    2025250     20200   16.7000  142.7600       8.1        57       132        60
OIR    2025250     20200   16.7000  142.7400       8.0        58       132        60
OIR    2025250     20200   16.7000  142.7200       7.9        58       128        60
OIR    2025250     20200   16.7000  142.7000       7.8        59       128        60
OIR    2025250     20200   16.7000  142.6800       7.8        60       128        60
OIR    2025250     20200   16.7000  142.6600       7.8        61       128        60
OIR    2025250     20200   16.7000  142.6400       7.9        63       107        60
OIR    2025250     20200   16.7000  142.6200       7.9        64       123        60
OIR    2025250     20200   16.7000  142.6000       8.0        65       119        60
OIR    2025250     20200   16.7000  142.5800       8.0        67       123        60
OIR    2025250     20200   16.7000  142.5600       8.1        70       119        60
OIR    2025250     20200   16.7000  142.5400       8.3        72       115        60
OIR    2025250     20200   16.7000  142.5200       8.7        75       111        60
OIR    2025250     20200   16.7000  142.5000       9.2        78       119        60
OIR    2025250     20200   16.7000  142.4800       9.4        79       119        60
OIR    2025250     20200   16.7000  142.4600       9.3        79       119        60
OIR    2025250     20200   16.7000  142.4400       9.2        79       115        60
OIR    2025250     20200   16.7000  142.4200       9.3        79       119        60
OIR    2025250     20200   16.7000  142.4000       9.3        79       111        60
OIR    2025250     20200   16.7000  142.3800       9.8        83       128        60
OIR    2025250     20200   16.7000  142.3600       9.8        83       132        60
OIR    2025250     20200   16.7000  141.9800       9.6       157       144        60
OIR    2025250     20200   16.7000  141.9600       9.6       158       132        60
OIR    2025250     20200   16.7000  141.9400       9.5       158       128        60
OIR    2025250     20200   16.7000  141.9200       9.5       158       132        60
OIR    2025250     20200   16.7000  141.9000       9.5       159       115        60
OIR    2025250     20200   16.7000  141.8800       9.4       160       123        60
OIR    2025250     20200   16.7000  141.8600       9.4       160       115        60
OIR    2025250     20200   16.7000  141.8400       9.4       161       123        60
OIR    2025250     20200   16.7000  141.8200       9.4       161       111        60
OIR    2025250     20200   16.7000  141.8000       9.3       162       115        60
OIR    2025250     20200   16.7000  141.7800       9.3       163       111        60
OIR    2025250     20200   16.7000  141.7600       9.3       164       111        60
OIR    2025250     20200   16.7000  141.7400       9.4       164       111        60
OIR    2025250     20200   16.7000  141.7200       9.4       164       111        60
OIR    2025250     20200   16.7000  141.7000       9.4       164       115        60
OIR    2025250     20200   16.7000  141.6800       9.4       165        99        60
OIR    2025250     20200   16.7000  141.6600       9.5       165       103        60
OIR    2025250     20200   16.7000  141.6400       9.5       165       103        60
OIR    2025250     20200   16.7000  141.6200       9.5       165       123        60
OIR    2025250     20200   16.7000  141.6000       9.6       165       128        60
OIR    2025250     20200   16.7000  141.5800       9.6       165       123        60
OIR    2025250     20200   16.6800  142.8200       8.0        53       132        60
OIR    2025250     20200   16.6800  142.8000       8.1        54       136        60
OIR    2025250     20200   16.6800  142.7800       8.0        55       136        60
OIR    2025250     20200   16.6800  142.7600       8.0        56       136        60
OIR    2025250     20200   16.6800  142.7400       7.9        56       132        60
OIR    2025250     20200   16.6800  142.7200       7.8        57       123        60
OIR    2025250     20200   16.6800  142.7000       7.7        58       123        60
OIR    2025250     20200   16.6800  142.6800       7.6        59       128        60
OIR    2025250     20200   16.6800  142.6600       7.6        60       128        60
OIR    2025250     20200   16.6800  142.6400       7.6        61       123        60
OIR    2025250     20200   16.6800  142.6200       7.7        62       128        60
OIR    2025250     20200   16.6800  142.6000       7.7        64       123        60
OIR    2025250     20200   16.6800  142.5800       7.8        66       123        60
OIR    2025250     20200   16.6800  142.5600       7.9        69       111        60
OIR    2025250     20200   16.6800  142.5400       7.9        70       111        60
OIR    2025250     20200   16.6800  142.5200       8.4        74       111        60
OIR    2025250     20200   16.6800  142.5000       8.9        78       119        60
OIR    2025250     20200   16.6800  142.4800       9.3        79       111        60
OIR    2025250     20200   16.6800  142.4600       8.3        77       111        60
OIR    2025250     20200   16.6800  142.4400       8.2        77       115        60
OIR    2025250     20200   16.6800  142.4200       8.3        77       115        60
OIR    2025250     20200   16.6800  142.4000       9.3        80       115        60
OIR    2025250     20200   16.6800  142.3800       9.9        84       132        60
OIR    2025250     20200   16.6800  141.9600       9.6       158       136        60
OIR    2025250     20200   16.6800  141.9400       9.5       158       111        60
OIR    2025250     20200   16.6800  141.9200       9.5       159       123        60
OIR    2025250     20200   16.6800  141.9000       9.5       160       107        60
OIR    2025250     20200   16.6800  141.8800       9.4       160       123        60
OIR    2025250     20200   16.6800  141.8600       9.4       161       111        60
OIR    2025250     20200   16.6800  141.8400       9.4       161       119        60
OIR    2025250     20200   16.6800  141.8200       9.4       162       111        60
OIR    2025250     20200   16.6800  141.8000       9.3       163       111        60
OIR    2025250     20200   16.6800  141.7800       9.3       164       111        60
OIR    2025250     20200   16.6800  141.7600       9.3       164       111        60
OIR    2025250     20200   16.6800  141.7400       9.3       164       111        60
OIR    2025250     20200   16.6800  141.7200       9.4       165       111        60
OIR    2025250     20200   16.6800  141.7000       9.4       165       111        60
OIR    2025250     20200   16.6800  141.6800       9.4       165       119        60
OIR    2025250     20200   16.6800  141.6600       9.4       165       119        60
OIR    2025250     20200   16.6800  141.6400       9.5       165       123        60
OIR    2025250     20200   16.6800  141.6200       9.5       165       123        60
OIR    2025250     20200   16.6800  141.6000       9.5       165       128        60
OIR    2025250     20200   16.6800  141.5800       9.6       165       128        60
OIR    2025250     20200   16.6800  141.5600       9.6       164       136        60
OIR    2025250     20200   16.6600  142.8200       7.8        50       140        60
OIR    2025250     20200   16.6600  142.8000       7.8        52       132        60
OIR    2025250     20200   16.6600  142.7800       7.8        53       136        60
OIR    2025250     20200   16.6600  142.7600       7.8        54       136        60
OIR    2025250     20200   16.6600  142.7400       7.7        55       132        60
OIR    2025250     20200   16.6600  142.7200       7.6        56       128        60
OIR    2025250     20200   16.6600  142.7000       7.4        56       128        60
OIR    2025250     20200   16.6600  142.6800       7.4        57       128        60
OIR    2025250     20200   16.6600  142.6600       7.3        58       123        60
OIR    2025250     20200   16.6600  142.6400       7.3        59       128        60
OIR    2025250     20200   16.6600  142.6200       7.3        61       128        60
OIR    2025250     20200   16.6600  142.6000       7.3        62       123        60
OIR    2025250     20200   16.6600  142.5800       7.4        64       119        60
OIR    2025250     20200   16.6600  142.5600       7.4        67       111        60
OIR    2025250     20200   16.6600  142.5400       7.5        68       111        60
OIR    2025250     20200   16.6600  142.5200       7.8        71       111        60
OIR    2025250     20200   16.6600  142.5000       8.5        76       119        60
OIR    2025250     20200   16.6600  142.4800       8.5        77       111        60
OIR    2025250     20200   16.6600  142.4600       7.5        75       111        60
OIR    2025250     20200   16.6600  142.4400       7.1        73       111        60
OIR    2025250     20200   16.6600  142.4200       7.2        74       119        60
OIR    2025250     20200   16.6600  142.4000       9.5        82       128        60
OIR    2025250     20200   16.6600  141.9400       9.5       158       136        60
OIR    2025250     20200   16.6600  141.9200       9.5       159       115        60
OIR    2025250     20200   16.6600  141.9000       9.4       160       128        60
OIR    2025250     20200   16.6600  141.8800       9.4       161       115        60
OIR    2025250     20200   16.6600  141.8600       9.4       161       123        60
OIR    2025250     20200   16.6600  141.8400       9.4       162       111        60
OIR    2025250     20200   16.6600  141.8200       9.3       163       111        60
OIR    2025250     20200   16.6600  141.8000       9.3       164       119        60
OIR    2025250     20200   16.6600  141.7800       9.3       164       111        60
OIR    2025250     20200   16.6600  141.7600       9.3       165       111        60
OIR    2025250     20200   16.6600  141.7400       9.3       165       111        60
OIR    2025250     20200   16.6600  141.7200       9.3       165       111        60
OIR    2025250     20200   16.6600  141.7000       9.4       165       119        60
OIR    2025250     20200   16.6600  141.6800       9.4       165       111        60
OIR    2025250     20200   16.6600  141.6600       9.4       165       111        60
OIR    2025250     20200   16.6600  141.6400       9.4       165       115        60
OIR    2025250     20200   16.6600  141.6200       9.5       165       123        60
OIR    2025250     20200   16.6600  141.6000       9.5       165       123        60
OIR    2025250     20200   16.6600  141.5800       9.6       165       132        60
OIR    2025250     20200   16.6600  141.5600       9.6       164       132        60
OIR    2025250     20200   16.6400  142.8000       7.5        48       132        60
OIR    2025250     20200   16.6400  142.7800       7.5        50       132        60
OIR    2025250     20200   16.6400  142.7600       7.5        51       136        60
OIR    2025250     20200   16.6400  142.7400       7.4        52       128        60
OIR    2025250     20200   16.6400  142.7200       7.2        53       128        60
OIR    2025250     20200   16.6400  142.7000       7.1        54       128        60
OIR    2025250     20200   16.6400  142.6800       7.0        55       123        60
OIR    2025250     20200   16.6400  142.6600       6.9        56       123        60
OIR    2025250     20200   16.6400  142.6400       6.9        57       123        60
OIR    2025250     20200   16.6400  142.6200       6.9        58       128        60
OIR    2025250     20200   16.6400  142.6000       6.9        60       123        60
OIR    2025250     20200   16.6400  142.5800       6.9        61       123        60
OIR    2025250     20200   16.6400  142.5600       6.9        63       115        60
OIR    2025250     20200   16.6400  142.5400       6.9        64       111        60
OIR    2025250     20200   16.6400  142.5200       7.1        67       111        60
OIR    2025250     20200   16.6400  142.5000       7.9        74       119        60
OIR    2025250     20200   16.6400  142.4800       7.4        74       119        60
OIR    2025250     20200   16.6400  142.4600       7.1        73       111        60
OIR    2025250     20200   16.6400  142.4400       6.9        72       115        60
OIR    2025250     20200   16.6400  142.4200       6.9        72       119        60
OIR    2025250     20200   16.6400  142.4000       9.6        83       136        60
OIR    2025250     20200   16.6400  141.9400       9.5       159       119        60
OIR    2025250     20200   16.6400  141.9200       9.5       159       128        60
OIR    2025250     20200   16.6400  141.9000       9.4       160       123        60
OIR    2025250     20200   16.6400  141.8800       9.4       161       123        60
OIR    2025250     20200   16.6400  141.8600       9.3       162       115        60
OIR    2025250     20200   16.6400  141.8400       9.3       163       123        60
OIR    2025250     20200   16.6400  141.8200       9.2       164       119        60
OIR    2025250     20200   16.6400  141.8000       9.2       164       111        60
OIR    2025250     20200   16.6400  141.7800       9.2       165       111        60
OIR    2025250     20200   16.6400  141.7600       9.2       165       111        60
OIR    2025250     20200   16.6400  141.7400       9.3       165       111        60
OIR    2025250     20200   16.6400  141.7200       9.3       165       111        60
OIR    2025250     20200   16.6400  141.7000       9.3       165       119        60
OIR    2025250     20200   16.6400  141.6800       9.4       165       111        60
OIR    2025250     20200   16.6400  141.6600       9.4       165       119        60
OIR    2025250     20200   16.6400  141.6400       9.4       165       111        60
OIR    2025250     20200   16.6400  141.6200       9.5       165       123        60
OIR    2025250     20200   16.6400  141.6000       9.5       165       123        60
OIR    2025250     20200   16.6400  141.5800       9.5       165       128        60
OIR    2025250     20200   16.6400  141.5600       9.6       164       136        60
OIR    2025250     20200   16.6200  142.8000       7.2        44       136        60
OIR    2025250     20200   16.6200  142.7800       7.2        46       136        60
OIR    2025250     20200   16.6200  142.7600       7.1        48       136        60
OIR    2025250     20200   16.6200  142.7400       6.9        48       132        60
OIR    2025250     20200   16.6200  142.7200       6.8        49       128        60
OIR    2025250     20200   16.6200  142.7000       6.7        50       132        60
OIR    2025250     20200   16.6200  142.6800       6.5        51       132        60
OIR    2025250     20200   16.6200  142.6600       6.5        52       132        60
OIR    2025250     20200   16.6200  142.6400       6.4        53       128        60
OIR    2025250     20200   16.6200  142.6200       6.4        54       123        60
OIR    2025250     20200   16.6200  142.6000       6.4        56       123        60
OIR    2025250     20200   16.6200  142.5800       6.3        57       119        60
OIR    2025250     20200   16.6200  142.5600       6.3        58       111        60
OIR    2025250     20200   16.6200  142.5400       6.3        60       119        60
OIR    2025250     20200   16.6200  142.5200       6.1        60       111        60
OIR    2025250     20200   16.6200  142.5000       6.0        63       119        60
OIR    2025250     20200   16.6200  142.4800       6.8        71       119        60
OIR    2025250     20200   16.6200  142.4600       7.0        73       123        60
OIR    2025250     20200   16.6200  142.4400       6.9        72       119        60
OIR    2025250     20200   16.6200  142.4200       7.0        73       128        60
OIR    2025250     20200   16.6200  142.4000      10.4        85       132        60
OIR    2025250     20200   16.6200  141.9400       9.5       159       140        60
OIR    2025250     20200   16.6200  141.9200       9.5       159       132        60
OIR    2025250     20200   16.6200  141.9000       9.4       160       115        60
OIR    2025250     20200   16.6200  141.8800       9.3       161       115        60
OIR    2025250     20200   16.6200  141.8600       9.2       163       123        60
OIR    2025250     20200   16.6200  141.8400       9.2       164       111        60
OIR    2025250     20200   16.6200  141.8200       9.1       165       111        60
OIR    2025250     20200   16.6200  141.8000       9.1       165       111        60
OIR    2025250     20200   16.6200  141.7800       9.1       165       111        60
OIR    2025250     20200   16.6200  141.7600       9.2       166       115        60
OIR    2025250     20200   16.6200  141.7400       9.2       165       111        60
OIR    2025250     20200   16.6200  141.7200       9.2       165       111        60
OIR    2025250     20200   16.6200  141.7000       9.3       165       111        60
OIR    2025250     20200   16.6200  141.6800       9.3       165       123        60
OIR    2025250     20200   16.6200  141.6600       9.4       165       119        60
OIR    2025250     20200   16.6200  141.6400       9.4       165       119        60
OIR    2025250     20200   16.6200  141.6200       9.4       165       123        60
OIR    2025250     20200   16.6200  141.6000       9.5       165       128        60
OIR    2025250     20200   16.6200  141.5800       9.5       165       128        60
OIR    2025250     20200   16.6200  141.5600       9.6       164       128        60
OIR    2025250     20200   16.6000  142.8000       7.0        40       136        60
OIR    2025250     20200   16.6000  142.7800       6.9        42       136        60
OIR    2025250     20200   16.6000  142.7600       6.8        44       136        60
OIR    2025250     20200   16.6000  142.7400       6.6        45       132        60
OIR    2025250     20200   16.6000  142.7200       6.4        46       132        60
OIR    2025250     20200   16.6000  142.7000       6.3        47       132        60
OIR    2025250     20200   16.6000  142.6800       6.2        47       132        60
OIR    2025250     20200   16.6000  142.6600       6.1        48       128        60
OIR    2025250     20200   16.6000  142.6400       6.0        49       123        60
OIR    2025250     20200   16.6000  142.6200       5.9        50       123        60
OIR    2025250     20200   16.6000  142.6000       5.9        51       123        60
OIR    2025250     20200   16.6000  142.5800       5.8        53       119        60
OIR    2025250     20200   16.6000  142.5600       5.8        54       111        60
OIR    2025250     20200   16.6000  142.5400       5.8        55       111        60
OIR    2025250     20200   16.6000  142.5200       5.6        57       119        60
OIR    2025250     20200   16.6000  142.5000       5.4        57       115        60
OIR    2025250     20200   16.6000  142.4800       5.4        61       123        60
OIR    2025250     20200   16.6000  142.4600       6.0        68       111        60
OIR    2025250     20200   16.6000  142.4400       6.8        73       119        60
OIR    2025250     20200   16.6000  142.4200       7.4        78       136        60
OIR    2025250     20200   16.6000  142.4000      11.1        88       140        60
OIR    2025250     20200   16.6000  141.9200       9.4       159       119        60
OIR    2025250     20200   16.6000  141.9000       9.4       161       132        60
OIR    2025250     20200   16.6000  141.8800       9.2       163       115        60
OIR    2025250     20200   16.6000  141.8600       9.1       164       111        60
OIR    2025250     20200   16.6000  141.8400       9.0       166       111        60
OIR    2025250     20200   16.6000  141.8200       9.0       166       111        60
OIR    2025250     20200   16.6000  141.8000       9.0       167       111        60
OIR    2025250     20200   16.6000  141.7800       9.0       167       119        60
OIR    2025250     20200   16.6000  141.7600       9.0       167       111        60
OIR    2025250     20200   16.6000  141.7400       9.0       167       119        60
OIR    2025250     20200   16.6000  141.7200       9.1       166       115        60
OIR    2025250     20200   16.6000  141.7000       9.2       166       111        60
OIR    2025250     20200   16.6000  141.6800       9.2       166       123        60
OIR    2025250     20200   16.6000  141.6600       9.3       165       123        60
OIR    2025250     20200   16.6000  141.6400       9.4       165       123        60
OIR    2025250     20200   16.6000  141.6200       9.4       165       115        60
OIR    2025250     20200   16.6000  141.6000       9.4       165       115        60
OIR    2025250     20200   16.6000  141.5800       9.5       165       123        60
OIR    2025250     20200   16.6000  141.5600       9.5       165       128        60
OIR    2025250     20200   16.5800  142.8000       6.9        39       132        60
OIR    2025250     20200   16.5800  142.7800       6.8        40       136        60
OIR    2025250     20200   16.5800  142.7600       6.6        41       132        60
OIR    2025250     20200   16.5800  142.7400       6.4        42       136        60
OIR    2025250     20200   16.5800  142.7200       6.2        43       128        60
OIR    2025250     20200   16.5800  142.7000       6.1        44       132        60
OIR    2025250     20200   16.5800  142.6800       5.9        45       128        60
OIR    2025250     20200   16.5800  142.6600       5.8        46       132        60
OIR    2025250     20200   16.5800  142.6400       5.7        47       128        60
OIR    2025250     20200   16.5800  142.6200       5.6        47       123        60
OIR    2025250     20200   16.5800  142.6000       5.6        49       128        60
OIR    2025250     20200   16.5800  142.5800       5.6        50       111        60
OIR    2025250     20200   16.5800  142.5600       5.6        52       119        60
OIR    2025250     20200   16.5800  142.5400       5.5        53       111        60
OIR    2025250     20200   16.5800  142.5200       5.5        55       123        60
OIR    2025250     20200   16.5800  142.5000       5.3        56       119        60
OIR    2025250     20200   16.5800  142.4800       5.2        58       119        60
OIR    2025250     20200   16.5800  142.4600       4.9        59       123        60
OIR    2025250     20200   16.5800  142.4400       5.7        70       123        60
OIR    2025250     20200   16.5800  142.4200       6.4        80       140        60
OIR    2025250     20200   16.5800  141.9200       9.3       160       140        60
OIR    2025250     20200   16.5800  141.9000       9.2       163       111        60
OIR    2025250     20200   16.5800  141.8800       9.0       165       128        60
OIR    2025250     20200   16.5800  141.8600       8.9       167       111        60
OIR    2025250     20200   16.5800  141.8400       8.8       168       119        60
OIR    2025250     20200   16.5800  141.8200       8.8       168       119        60
OIR    2025250     20200   16.5800  141.8000       8.8       168       119        60
OIR    2025250     20200   16.5800  141.7800       8.8       169       111        60
OIR    2025250     20200   16.5800  141.7600       8.8       169       115        60
OIR    2025250     20200   16.5800  141.7400       8.8       169       111        60
OIR    2025250     20200   16.5800  141.7200       8.9       169       111        60
OIR    2025250     20200   16.5800  141.7000       9.0       168       119        60
OIR    2025250     20200   16.5800  141.6800       9.1       167       123        60
OIR    2025250     20200   16.5800  141.6600       9.2       166       123        60
OIR    2025250     20200   16.5800  141.6400       9.3       166       123        60
OIR    2025250     20200   16.5800  141.6200       9.3       166       123        60
OIR    2025250     20200   16.5800  141.6000       9.4       165       123        60
OIR    2025250     20200   16.5800  141.5800       9.4       165       128        60
OIR    2025250     20200   16.5800  141.5600       9.5       165       132        60
OIR    2025250     20200   16.5800  141.5400       9.5       165       132        60
OIR    2025250     20200   16.5600  142.7800       6.7        39       132        60
OIR    2025250     20200   16.5600  142.7600       6.5        40       140        60
OIR    2025250     20200   16.5600  142.7400       6.3        41       132        60
OIR    2025250     20200   16.5600  142.7200       6.0        41       132        60
OIR    2025250     20200   16.5600  142.7000       5.9        42       128        60
OIR    2025250     20200   16.5600  142.6800       5.7        42       128        60
OIR    2025250     20200   16.5600  142.6600       5.6        43       132        60
OIR    2025250     20200   16.5600  142.6400       5.5        44       128        60
OIR    2025250     20200   16.5600  142.6200       5.4        45       128        60
OIR    2025250     20200   16.5600  142.6000       5.4        46       123        60
OIR    2025250     20200   16.5600  142.5800       5.4        47       123        60
OIR    2025250     20200   16.5600  142.5600       5.4        50       119        60
OIR    2025250     20200   16.5600  142.5400       5.4        51       123        60
OIR    2025250     20200   16.5600  142.5200       5.3        53       119        60
OIR    2025250     20200   16.5600  142.5000       5.3        55       119        60
OIR    2025250     20200   16.5600  142.4800       5.0        55       123        60
OIR    2025250     20200   16.5600  142.4600       4.3        55       128        60
OIR    2025250     20200   16.5600  142.4200       4.2        76       136        60
OIR    2025250     20200   16.5600  141.9000       8.8       166       136        60
OIR    2025250     20200   16.5600  141.8800       8.7       168       128        60
OIR    2025250     20200   16.5600  141.8600       8.5       169       111        60
OIR    2025250     20200   16.5600  141.8400       8.5       171       111        60
OIR    2025250     20200   16.5600  141.8200       8.5       171       111        60
OIR    2025250     20200   16.5600  141.8000       8.5       171       111        60
OIR    2025250     20200   16.5600  141.7800       8.5       171       111        60
OIR    2025250     20200   16.5600  141.7600       8.5       171       111        60
OIR    2025250     20200   16.5600  141.7400       8.6       171       111        60
OIR    2025250     20200   16.5600  141.7200       8.6       171       119        60
OIR    2025250     20200   16.5600  141.7000       8.7       170       123        60
OIR    2025250     20200   16.5600  141.6800       8.9       169       123        60
OIR    2025250     20200   16.5600  141.6600       9.0       168       115        60
OIR    2025250     20200   16.5600  141.6400       9.1       167       119        60
OIR    2025250     20200   16.5600  141.6200       9.2       166       115        60
OIR    2025250     20200   16.5600  141.6000       9.2       166       123        60
OIR    2025250     20200   16.5600  141.5800       9.2       166       128        60
OIR    2025250     20200   16.5600  141.5600       9.3       166       128        60
OIR    2025250     20200   16.5600  141.5400       9.4       165       132        60
OIR    2025250     20200   16.5400  142.7800       6.6        37       132        60
OIR    2025250     20200   16.5400  142.7600       6.3        38       140        60
OIR    2025250     20200   16.5400  142.7400       6.1        38       132        60
OIR    2025250     20200   16.5400  142.7200       5.8        39       132        60
OIR    2025250     20200   16.5400  142.7000       5.7        40       128        60
OIR    2025250     20200   16.5400  142.6800       5.5        40       132        60
OIR    2025250     20200   16.5400  142.6600       5.4        41       123        60
OIR    2025250     20200   16.5400  142.6400       5.3        42       132        60
OIR    2025250     20200   16.5400  142.6200       5.2        42       119        60
OIR    2025250     20200   16.5400  142.6000       5.1        43       119        60
OIR    2025250     20200   16.5400  142.5800       5.1        45       123        60
OIR    2025250     20200   16.5400  142.5600       5.1        46       111        60
OIR    2025250     20200   16.5400  142.5400       5.0        48       111        60
OIR    2025250     20200   16.5400  142.5200       5.0        49       115        60
OIR    2025250     20200   16.5400  142.5000       5.1        52       111        60
OIR    2025250     20200   16.5400  142.4800       4.8        52       123        60
OIR    2025250     20200   16.5400  141.9200       8.2       170       136        60
OIR    2025250     20200   16.5400  141.9000       8.2       171       119        60
OIR    2025250     20200   16.5400  141.8800       8.2       172       132        60
OIR    2025250     20200   16.5400  141.8600       8.2       172       115        60
OIR    2025250     20200   16.5400  141.8400       8.2       173       119        60
OIR    2025250     20200   16.5400  141.8200       8.2       173       111        60
OIR    2025250     20200   16.5400  141.8000       8.2       173       111        60
OIR    2025250     20200   16.5400  141.7800       8.3       173       111        60
OIR    2025250     20200   16.5400  141.7600       8.3       173       119        60
OIR    2025250     20200   16.5400  141.7400       8.3       173       119        60
OIR    2025250     20200   16.5400  141.7200       8.4       173       119        60
OIR    2025250     20200   16.5400  141.7000       8.5       172       119        60
OIR    2025250     20200   16.5400  141.6800       8.6       171       119        60
OIR    2025250     20200   16.5400  141.6600       8.7       170       115        60
OIR    2025250     20200   16.5400  141.6400       8.8       169       115        60
OIR    2025250     20200   16.5400  141.6200       8.8       169       119        60
OIR    2025250     20200   16.5400  141.6000       8.9       169       119        60
OIR    2025250     20200   16.5400  141.5800       9.0       168       123        60
OIR    2025250     20200   16.5400  141.5600       9.1       167       123        60
OIR    2025250     20200   16.5400  141.5400       9.3       166       132        60
OIR    2025250     20200   16.5200  142.7800       6.4        36       136        60
OIR    2025250     20200   16.5200  142.7600       6.1        36       136        60
OIR    2025250     20200   16.5200  142.7400       5.8        36       132        60
OIR    2025250     20200   16.5200  142.7200       5.6        37       132        60
OIR    2025250     20200   16.5200  142.7000       5.5        37       128        60
OIR    2025250     20200   16.5200  142.6800       5.3        38       128        60
OIR    2025250     20200   16.5200  142.6600       5.2        38       123        60
OIR    2025250     20200   16.5200  142.6400       5.1        39       128        60
OIR    2025250     20200   16.5200  142.6200       5.0        40       123        60
OIR    2025250     20200   16.5200  142.6000       4.9        40       123        60
OIR    2025250     20200   16.5200  142.5800       4.8        41       119        60
OIR    2025250     20200   16.5200  142.5600       4.7        42       111        60
OIR    2025250     20200   16.5200  142.5400       4.6        42       111        60
OIR    2025250     20200   16.5200  142.5200       4.5        43       123        60
OIR    2025250     20200   16.5200  142.5000       4.5        43       119        60
OIR    2025250     20200   16.5200  142.4800       4.3        43       123        60
OIR    2025250     20200   16.5200  141.9200       7.9       173       119        60
OIR    2025250     20200   16.5200  141.9000       8.0       173       115        60
OIR    2025250     20200   16.5200  141.8800       8.0       173       111        60
OIR    2025250     20200   16.5200  141.8600       8.0       173       107        60
OIR    2025250     20200   16.5200  141.8400       8.1       174       115        60
OIR    2025250     20200   16.5200  141.8200       8.1       174       111        60
OIR    2025250     20200   16.5200  141.8000       8.1       174       111        60
OIR    2025250     20200   16.5200  141.7800       8.1       175       119        60
OIR    2025250     20200   16.5200  141.7600       8.1       175       111        60
OIR    2025250     20200   16.5200  141.7400       8.2       175       111        60
OIR    2025250     20200   16.5200  141.7200       8.2       175       119        60
OIR    2025250     20200   16.5200  141.7000       8.3       174       115        60
OIR    2025250     20200   16.5200  141.6800       8.3       173       111        60
OIR    2025250     20200   16.5200  141.6600       8.4       172       123        60
OIR    2025250     20200   16.5200  141.6400       8.5       171       119        60
OIR    2025250     20200   16.5200  141.6200       8.5       171       115        60
OIR    2025250     20200   16.5200  141.6000       8.6       170       119        60
OIR    2025250     20200   16.5200  141.5800       8.7       170       119        60
OIR    2025250     20200   16.5200  141.5600       8.8       169       128        60
OIR    2025250     20200   16.5200  141.5400       9.0       169       128        60
OIR    2025250     20200   16.5000  142.7800       6.1        34       136        60
OIR    2025250     20200   16.5000  142.7600       5.8        34       132        60
OIR    2025250     20200   16.5000  142.7400       5.6        35       132        60
OIR    2025250     20200   16.5000  142.7200       5.4        35       132        60
OIR    2025250     20200   16.5000  142.7000       5.3        35       132        60
OIR    2025250     20200   16.5000  142.6800       5.1        36       132        60
OIR    2025250     20200   16.5000  142.6600       5.0        36       128        60
OIR    2025250     20200   16.5000  142.6400       4.9        37       128        60
OIR    2025250     20200   16.5000  142.6200       4.8        37       123        60
OIR    2025250     20200   16.5000  142.6000       4.7        38       123        60
OIR    2025250     20200   16.5000  142.5800       4.6        38       123        60
OIR    2025250     20200   16.5000  142.5600       4.5        39       119        60
OIR    2025250     20200   16.5000  142.5400       4.5        39       123        60
OIR    2025250     20200   16.5000  142.5200       4.4        39       123        60
OIR    2025250     20200   16.5000  142.5000       4.3        38       123        60
OIR    2025250     20200   16.5000  142.4800       4.2        38       123        60
OIR    2025250     20200   16.5000  142.4600       4.1        37       128        60
OIR    2025250     20200   16.5000  141.9200       7.8       174       132        60
OIR    2025250     20200   16.5000  141.9000       7.9       174       132        60
OIR    2025250     20200   16.5000  141.8800       7.9       174       107        60
OIR    2025250     20200   16.5000  141.8600       7.9       174       115        60
OIR    2025250     20200   16.5000  141.8400       8.0       175       128        60
OIR    2025250     20200   16.5000  141.8200       8.0       175       111        60
OIR    2025250     20200   16.5000  141.8000       8.0       175       115        60
OIR    2025250     20200   16.5000  141.7800       8.0       176       119        60
OIR    2025250     20200   16.5000  141.7600       8.0       176       119        60
OIR    2025250     20200   16.5000  141.7400       8.1       176       111        60
OIR    2025250     20200   16.5000  141.7200       8.1       176       111        60
OIR    2025250     20200   16.5000  141.7000       8.1       175       111        60
OIR    2025250     20200   16.5000  141.6800       8.2       174       119        60
OIR    2025250     20200   16.5000  141.6600       8.2       173       123        60
OIR    2025250     20200   16.5000  141.6400       8.3       173       123        60
OIR    2025250     20200   16.5000  141.6200       8.3       173       119        60
OIR    2025250     20200   16.5000  141.6000       8.3       173       123        60
OIR    2025250     20200   16.5000  141.5800       8.4       173       119        60
OIR    2025250     20200   16.5000  141.5600       8.5       172       132        60
OIR    2025250     20200   16.5000  141.5400       8.7       172       132        60
OIR    2025250     20200   16.4800  142.7800       5.8        33       136        60
OIR    2025250     20200   16.4800  142.7600       5.5        33       136        60
OIR    2025250     20200   16.4800  142.7400       5.4        33       136        60
OIR    2025250     20200   16.4800  142.7200       5.3        33       132        60
OIR    2025250     20200   16.4800  142.7000       5.1        33       132        60
OIR    2025250     20200   16.4800  142.6800       5.0        34       128        60
OIR    2025250     20200   16.4800  142.6600       4.9        34       123        60
OIR    2025250     20200   16.4800  142.6400       4.8        35       132        60
OIR    2025250     20200   16.4800  142.6200       4.7        35       123        60
OIR    2025250     20200   16.4800  142.6000       4.6        36       128        60
OIR    2025250     20200   16.4800  142.5800       4.5        36       123        60
OIR    2025250     20200   16.4800  142.5600       4.5        37       119        60
OIR    2025250     20200   16.4800  142.5400       4.4        37       123        60
OIR    2025250     20200   16.4800  142.5200       4.3        37       119        60
OIR    2025250     20200   16.4800  142.5000       4.3        37       111        60
OIR    2025250     20200   16.4800  142.4800       4.2        37       123        60
OIR    2025250     20200   16.4800  142.4600       4.2        36       123        60
OIR    2025250     20200   16.4800  142.4400       4.0        36       136        60
OIR    2025250     20200   16.4800  141.9200       7.7       175       140        60
OIR    2025250     20200   16.4800  141.9000       7.7       175       111        60
OIR    2025250     20200   16.4800  141.8800       7.8       175       107        60
OIR    2025250     20200   16.4800  141.8600       7.8       175       123        60
OIR    2025250     20200   16.4800  141.8400       7.8       176       111        60
OIR    2025250     20200   16.4800  141.8200       7.9       176       111        60
OIR    2025250     20200   16.4800  141.8000       7.9       176       111        60
OIR    2025250     20200   16.4800  141.7800       7.9       177       111        60
OIR    2025250     20200   16.4800  141.7600       8.0       177       111        60
OIR    2025250     20200   16.4800  141.7400       8.0       177       115        60
OIR    2025250     20200   16.4800  141.7200       8.0       177       111        60
OIR    2025250     20200   16.4800  141.7000       8.0       176       111        60
OIR    2025250     20200   16.4800  141.6800       8.1       176       123        60
OIR    2025250     20200   16.4800  141.6600       8.1       175       119        60
OIR    2025250     20200   16.4800  141.6400       8.1       174       115        60
OIR    2025250     20200   16.4800  141.6200       8.1       174       123        60
OIR    2025250     20200   16.4800  141.6000       8.2       174       123        60
OIR    2025250     20200   16.4800  141.5800       8.2       174       123        60
OIR    2025250     20200   16.4800  141.5600       8.3       174       123        60
OIR    2025250     20200   16.4800  141.5400       8.4       174       132        60
OIR    2025250     20200   16.4600  142.7600       5.3        31       140        60
OIR    2025250     20200   16.4600  142.7400       5.2        31       136        60
OIR    2025250     20200   16.4600  142.7200       5.1        32       132        60
OIR    2025250     20200   16.4600  142.7000       5.0        32       132        60
OIR    2025250     20200   16.4600  142.6800       4.9        32       132        60
OIR    2025250     20200   16.4600  142.6600       4.8        33       132        60
OIR    2025250     20200   16.4600  142.6400       4.7        33       128        60
OIR    2025250     20200   16.4600  142.6200       4.6        34       123        60
OIR    2025250     20200   16.4600  142.6000       4.5        34       123        60
OIR    2025250     20200   16.4600  142.5800       4.5        35       123        60
OIR    2025250     20200   16.4600  142.5600       4.4        35       123        60
OIR    2025250     20200   16.4600  142.5400       4.3        36       119        60
OIR    2025250     20200   16.4600  142.5200       4.3        36       111        60
OIR    2025250     20200   16.4600  142.5000       4.2        36       123        60
OIR    2025250     20200   16.4600  142.4800       4.2        36       123        60
OIR    2025250     20200   16.4600  142.4600       4.2        36       111        60
OIR    2025250     20200   16.4600  142.4400       4.1        36       136        60
OIR    2025250     20200   16.4600  141.9400       7.4       177       140        60
OIR    2025250     20200   16.4600  141.9200       7.5       177       136        60
OIR    2025250     20200   16.4600  141.9000       7.5       177       132        60
OIR    2025250     20200   16.4600  141.8800       7.6       177       115        60
OIR    2025250     20200   16.4600  141.8600       7.6       177       123        60
OIR    2025250     20200   16.4600  141.8400       7.7       178       111        60
OIR    2025250     20200   16.4600  141.8200       7.7       177       111        60
OIR    2025250     20200   16.4600  141.8000       7.8       177       107        60
OIR    2025250     20200   16.4600  141.7800       7.9       178       111        60
OIR    2025250     20200   16.4600  141.7600       7.9       178       111        60
OIR    2025250     20200   16.4600  141.7400       7.9       178       111        60
OIR    2025250     20200   16.4600  141.7200       7.9       177       119        60
OIR    2025250     20200   16.4600  141.7000       8.0       177       115        60
OIR    2025250     20200   16.4600  141.6800       8.0       176       123        60
OIR    2025250     20200   16.4600  141.6600       8.0       176       123        60
OIR    2025250     20200   16.4600  141.6400       8.0       175       123        60
OIR    2025250     20200   16.4600  141.6200       8.0       175       115        60
OIR    2025250     20200   16.4600  141.6000       8.1       175       123        60
OIR    2025250     20200   16.4600  141.5800       8.1       175       128        60
OIR    2025250     20200   16.4600  141.5600       8.2       175       128        60
OIR    2025250     20200   16.4600  141.5400       8.3       175       132        60
OIR    2025250     20200   16.4400  142.7800       5.4        30       132        60
OIR    2025250     20200   16.4400  142.7600       5.2        30       140        60
OIR    2025250     20200   16.4400  142.7400       5.1        30       132        60
OIR    2025250     20200   16.4400  142.7200       5.0        30       132        60
OIR    2025250     20200   16.4400  142.7000       4.9        31       132        60
OIR    2025250     20200   16.4400  142.6800       4.8        31       128        60
OIR    2025250     20200   16.4400  142.6600       4.7        31       132        60
OIR    2025250     20200   16.4400  142.6400       4.6        32       128        60
OIR    2025250     20200   16.4400  142.6200       4.6        32       123        60
OIR    2025250     20200   16.4400  142.6000       4.5        33       119        60
OIR    2025250     20200   16.4400  142.5800       4.4        34       119        60
OIR    2025250     20200   16.4400  142.5600       4.3        34       128        60
OIR    2025250     20200   16.4400  142.5400       4.3        35       123        60
OIR    2025250     20200   16.4400  142.5200       4.2        35       123        60
OIR    2025250     20200   16.4400  142.5000       4.2        35       128        60
OIR    2025250     20200   16.4400  142.4800       4.2        35       123        60
OIR    2025250     20200   16.4400  142.4600       4.2        35       123        60
OIR    2025250     20200   16.4400  142.4400       4.1        35       132        60
OIR    2025250     20200   16.4400  141.9400       6.8       182       136        60
OIR    2025250     20200   16.4400  141.9200       7.1       180       111        60
OIR    2025250     20200   16.4400  141.9000       7.2       179       128        60
OIR    2025250     20200   16.4400  141.8800       7.3       180       111        60
OIR    2025250     20200   16.4400  141.8600       7.3       181       111        60
OIR    2025250     20200   16.4400  141.8400       7.4       181       123        60
OIR    2025250     20200   16.4400  141.8200       7.5       180       111        60
OIR    2025250     20200   16.4400  141.8000       7.6       180       111        60
OIR    2025250     20200   16.4400  141.7800       7.7       179       111        60
OIR    2025250     20200   16.4400  141.7600       7.8       179       119        60
OIR    2025250     20200   16.4400  141.7400       7.9       178       111        60
OIR    2025250     20200   16.4400  141.7200       7.9       178       119        60
OIR    2025250     20200   16.4400  141.7000       7.9       178       119        60
OIR    2025250     20200   16.4400  141.6800       7.9       177       119        60
OIR    2025250     20200   16.4400  141.6600       7.8       177       128        60
OIR    2025250     20200   16.4400  141.6400       7.8       177       123        60
OIR    2025250     20200   16.4400  141.6200       7.8       177       128        60
OIR    2025250     20200   16.4400  141.6000       7.9       176       119        60
OIR    2025250     20200   16.4400  141.5800       8.0       176       128        60
OIR    2025250     20200   16.4400  141.5600       8.1       176       132        60
OIR    2025250     20200   16.4400  141.5400       8.2       176       132        60
OIR    2025250     20200   16.4200  142.7800       5.3        29       136        60
OIR    2025250     20200   16.4200  142.7600       5.1        29       140        60
OIR    2025250     20200   16.4200  142.7400       5.0        29       132        60
OIR    2025250     20200   16.4200  142.7200       4.9        30       128        60
OIR    2025250     20200   16.4200  142.7000       4.8        30       136        60
OIR    2025250     20200   16.4200  142.6800       4.7        30       128        60
OIR    2025250     20200   16.4200  142.6600       4.7        30       132        60
OIR    2025250     20200   16.4200  142.6400       4.6        31       128        60
OIR    2025250     20200   16.4200  142.6200       4.5        31       123        60
OIR    2025250     20200   16.4200  142.6000       4.4        32       128        60
OIR    2025250     20200   16.4200  142.5800       4.3        32       128        60
OIR    2025250     20200   16.4200  142.5600       4.3        33       123        60
OIR    2025250     20200   16.4200  142.5400       4.2        34       128        60
OIR    2025250     20200   16.4200  142.5200       4.2        34       128        60
OIR    2025250     20200   16.4200  142.5000       4.2        34       128        60
OIR    2025250     20200   16.4200  142.4800       4.1        34       119        60
OIR    2025250     20200   16.4200  142.4600       4.1        34       128        60
OIR    2025250     20200   16.4200  142.4400       4.0        34       128        60
OIR    2025250     20200   16.4200  141.9400       6.2       185       136        60
OIR    2025250     20200   16.4200  141.9200       6.5       183       111        60
OIR    2025250     20200   16.4200  141.9000       6.8       183       123        60
OIR    2025250     20200   16.4200  141.8800       6.8       185       123        60
OIR    2025250     20200   16.4200  141.8600       6.9       185       123        60
OIR    2025250     20200   16.4200  141.8400       7.1       184       123        60
OIR    2025250     20200   16.4200  141.8200       7.2       184       119        60
OIR    2025250     20200   16.4200  141.8000       7.4       182       107        60
OIR    2025250     20200   16.4200  141.7800       7.6       181       111        60
OIR    2025250     20200   16.4200  141.7600       7.7       180       111        60
OIR    2025250     20200   16.4200  141.7400       7.8       179       111        60
OIR    2025250     20200   16.4200  141.7200       7.8       179       115        60
OIR    2025250     20200   16.4200  141.7000       7.8       178       111        60
OIR    2025250     20200   16.4200  141.6800       7.8       178       119        60
OIR    2025250     20200   16.4200  141.6600       7.7       178       123        60
OIR    2025250     20200   16.4200  141.6400       7.7       179       123        60
OIR    2025250     20200   16.4200  141.6200       7.7       178       123        60
OIR    2025250     20200   16.4200  141.6000       7.8       177       128        60
OIR    2025250     20200   16.4200  141.5800       7.9       177       128        60
OIR    2025250     20200   16.4200  141.5600       8.0       177       136        60
OIR    2025250     20200   16.4000  142.7600       5.1        29       136        60
OIR    2025250     20200   16.4000  142.7400       4.9        29       136        60
OIR    2025250     20200   16.4000  142.7200       4.8        29       132        60
OIR    2025250     20200   16.4000  142.7000       4.8        29       132        60
OIR    2025250     20200   16.4000  142.6800       4.7        29       128        60
OIR    2025250     20200   16.4000  142.6600       4.6        29       123        60
OIR    2025250     20200   16.4000  142.6400       4.5        30       132        60
OIR    2025250     20200   16.4000  142.6200       4.4        30       123        60
OIR    2025250     20200   16.4000  142.6000       4.4        31       123        60
OIR    2025250     20200   16.4000  142.5800       4.3        31       123        60
OIR    2025250     20200   16.4000  142.5600       4.2        32       115        60
OIR    2025250     20200   16.4000  142.5400       4.1        32       128        60
OIR    2025250     20200   16.4000  142.5200       4.1        33       123        60
OIR    2025250     20200   16.4000  142.5000       4.0        33       128        60
OIR    2025250     20200   16.4000  142.4800       4.0        33       128        60
OIR    2025250     20200   16.4000  141.9600       5.4       192       136        60
OIR    2025250     20200   16.4000  141.9400       5.8       189       136        60
OIR    2025250     20200   16.4000  141.9200       6.1       187       123        60
OIR    2025250     20200   16.4000  141.9000       6.4       187       119        60
OIR    2025250     20200   16.4000  141.8800       6.5       188       119        60
OIR    2025250     20200   16.4000  141.8600       6.7       188       111        60
OIR    2025250     20200   16.4000  141.8400       6.8       187       119        60
OIR    2025250     20200   16.4000  141.8200       6.9       186       107        60
OIR    2025250     20200   16.4000  141.8000       7.1       185       111        60
OIR    2025250     20200   16.4000  141.7800       7.3       184       111        60
OIR    2025250     20200   16.4000  141.7600       7.5       182       111        60
OIR    2025250     20200   16.4000  141.7400       7.6       181       115        60
OIR    2025250     20200   16.4000  141.7200       7.7       180       111        60
OIR    2025250     20200   16.4000  141.7000       7.7       179       119        60
OIR    2025250     20200   16.4000  141.6800       7.7       179       119        60
OIR    2025250     20200   16.4000  141.6600       7.6       179       123        60
OIR    2025250     20200   16.4000  141.6400       7.6       179       111        60
OIR    2025250     20200   16.4000  141.6200       7.7       179       128        60
OIR    2025250     20200   16.4000  141.6000       7.7       178       128        60
OIR    2025250     20200   16.4000  141.5800       7.8       178       132        60
OIR    2025250     20200   16.4000  141.5600       7.9       177       128        60
OIR    2025250     20200   16.3800  142.7600       5.1        28       140        60
OIR    2025250     20200   16.3800  142.7400       4.9        28       132        60
OIR    2025250     20200   16.3800  142.7200       4.8        28       136        60
OIR    2025250     20200   16.3800  142.7000       4.7        28       132        60
OIR    2025250     20200   16.3800  142.6800       4.7        28       128        60
OIR    2025250     20200   16.3800  142.6600       4.6        29       123        60
OIR    2025250     20200   16.3800  142.6400       4.5        29       132        60
OIR    2025250     20200   16.3800  142.6200       4.4        29       128        60
OIR    2025250     20200   16.3800  142.6000       4.3        30       128        60
OIR    2025250     20200   16.3800  142.5800       4.2        30       128        60
OIR    2025250     20200   16.3800  142.5600       4.1        30       123        60
OIR    2025250     20200   16.3800  142.5400       4.0        31       123        60
OIR    2025250     20200   16.3800  142.5200       4.0        31       123        60
OIR    2025250     20200   16.3800  141.9600       5.0       198       132        60
OIR    2025250     20200   16.3800  141.9400       5.4       195       132        60
OIR    2025250     20200   16.3800  141.9200       5.7       192       111        60
OIR    2025250     20200   16.3800  141.9000       5.9       192       111        60
OIR    2025250     20200   16.3800  141.8800       6.2       191       111        60
OIR    2025250     20200   16.3800  141.8600       6.4       190       107        60
OIR    2025250     20200   16.3800  141.8400       6.6       189       107        60
OIR    2025250     20200   16.3800  141.8200       6.7       188       107        60
OIR    2025250     20200   16.3800  141.8000       6.8       187       107        60
OIR    2025250     20200   16.3800  141.7800       7.0       186       119        60
OIR    2025250     20200   16.3800  141.7600       7.2       185       111        60
OIR    2025250     20200   16.3800  141.7400       7.3       183       111        60
OIR    2025250     20200   16.3800  141.7200       7.5       181       111        60
OIR    2025250     20200   16.3800  141.7000       7.5       181       111        60
OIR    2025250     20200   16.3800  141.6800       7.5       180       119        60
OIR    2025250     20200   16.3800  141.6600       7.5       180       123        60
OIR    2025250     20200   16.3800  141.6400       7.5       180       123        60
OIR    2025250     20200   16.3800  141.6200       7.5       180       128        60
OIR    2025250     20200   16.3800  141.6000       7.6       179       119        60
OIR    2025250     20200   16.3800  141.5800       7.7       178       128        60
OIR    2025250     20200   16.3800  141.5600       7.8       177       136        60
OIR    2025250     20200   16.3600  142.7600       5.1        28       132        60
OIR    2025250     20200   16.3600  142.7400       4.9        28       132        60
OIR    2025250     20200   16.3600  142.7200       4.8        28       136        60
OIR    2025250     20200   16.3600  142.7000       4.7        28       136        60
OIR    2025250     20200   16.3600  142.6800       4.6        28       128        60
OIR    2025250     20200   16.3600  142.6600       4.5        28       111        60
OIR    2025250     20200   16.3600  142.6400       4.4        28       128        60
OIR    2025250     20200   16.3600  142.6200       4.4        28       128        60
OIR    2025250     20200   16.3600  142.6000       4.2        29       123        60
OIR    2025250     20200   16.3600  142.5800       4.1        29       123        60
OIR    2025250     20200   16.3600  142.5600       4.0        29       128        60
OIR    2025250     20200   16.3600  141.9800       4.8       207       136        60
OIR    2025250     20200   16.3600  141.9600       4.9       205       132        60
OIR    2025250     20200   16.3600  141.9400       5.1       202       107        60
OIR    2025250     20200   16.3600  141.9200       5.3       200       123        60
OIR    2025250     20200   16.3600  141.9000       5.5       200       107        60
OIR    2025250     20200   16.3600  141.8800       5.7       196       107        60
OIR    2025250     20200   16.3600  141.8600       6.0       194       107        60
OIR    2025250     20200   16.3600  141.8400       6.2       192       107        60
OIR    2025250     20200   16.3600  141.8200       6.4       191       107        60
OIR    2025250     20200   16.3600  141.8000       6.5       190       107        60
OIR    2025250     20200   16.3600  141.7800       6.6       189       107        60
OIR    2025250     20200   16.3600  141.7600       6.7       188       111        60
OIR    2025250     20200   16.3600  141.7400       6.9       186       123        60
OIR    2025250     20200   16.3600  141.7200       7.1       184       119        60
OIR    2025250     20200   16.3600  141.7000       7.2       183       111        60
OIR    2025250     20200   16.3600  141.6800       7.3       182       119        60
OIR    2025250     20200   16.3600  141.6600       7.3       182       123        60
OIR    2025250     20200   16.3600  141.6400       7.3       182       123        60
OIR    2025250     20200   16.3600  141.6200       7.4       181       115        60
OIR    2025250     20200   16.3600  141.6000       7.4       181       128        60
OIR    2025250     20200   16.3600  141.5800       7.5       179       132        60
OIR    2025250     20200   16.3600  141.5600       7.6       178       132        60
OIR    2025250     20200   16.3400  142.7400       4.9        27       132        60
OIR    2025250     20200   16.3400  142.7200       4.8        27       132        60
OIR    2025250     20200   16.3400  142.7000       4.7        27       132        60
OIR    2025250     20200   16.3400  142.6800       4.6        27       128        60
OIR    2025250     20200   16.3400  142.6600       4.5        27       128        60
OIR    2025250     20200   16.3400  142.6400       4.4        27       128        60
OIR    2025250     20200   16.3400  142.6200       4.3        27       128        60
OIR    2025250     20200   16.3400  142.6000       4.2        28       128        60
OIR    2025250     20200   16.3400  142.5800       4.1        28       128        60
OIR    2025250     20200   16.3400  142.0000       4.8       209       140        60
OIR    2025250     20200   16.3400  141.9800       4.8       208       136        60
OIR    2025250     20200   16.3400  141.9600       4.9       207       111        60
OIR    2025250     20200   16.3400  141.9400       5.0       207       119        60
OIR    2025250     20200   16.3400  141.9200       5.1       206       111        60
OIR    2025250     20200   16.3400  141.9000       5.2       204       111        60
OIR    2025250     20200   16.3400  141.8800       5.4       201       107        60
OIR    2025250     20200   16.3400  141.8600       5.7       198       107        60
OIR    2025250     20200   16.3400  141.8400       5.9       195       103        60
OIR    2025250     20200   16.3400  141.8200       6.2       193       103        60
OIR    2025250     20200   16.3400  141.8000       6.3       191       107        60
OIR    2025250     20200   16.3400  141.7800       6.4       191       115        60
OIR    2025250     20200   16.3400  141.7600       6.5       190       107        60
OIR    2025250     20200   16.3400  141.7400       6.6       189       111        60
OIR    2025250     20200   16.3400  141.7200       6.7       187       123        60
OIR    2025250     20200   16.3400  141.7000       6.9       186       119        60
OIR    2025250     20200   16.3400  141.6800       7.0       185       119        60
OIR    2025250     20200   16.3400  141.6600       7.1       184       123        60
OIR    2025250     20200   16.3400  141.6400       7.1       183       115        60
OIR    2025250     20200   16.3400  141.6200       7.2       183       123        60
OIR    2025250     20200   16.3400  141.6000       7.2       182       123        60
OIR    2025250     20200   16.3400  141.5800       7.3       181       132        60
OIR    2025250     20200   16.3400  141.5600       7.5       179       136        60
OIR    2025250     20200   16.3200  142.7400       4.9        27       136        60
OIR    2025250     20200   16.3200  142.7200       4.8        26       132        60
OIR    2025250     20200   16.3200  142.7000       4.6        26       132        60
OIR    2025250     20200   16.3200  142.6800       4.5        26       136        60
OIR    2025250     20200   16.3200  142.6600       4.4        26       132        60
OIR    2025250     20200   16.3200  142.6400       4.3        26       132        60
OIR    2025250     20200   16.3200  142.6200       4.2        26       128        60
OIR    2025250     20200   16.3200  142.6000       4.1        26       123        60
OIR    2025250     20200   16.3200  142.0200       4.7       210       140        60
OIR    2025250     20200   16.3200  142.0000       4.8       210       132        60
OIR    2025250     20200   16.3200  141.9800       4.8       209       128        60
OIR    2025250     20200   16.3200  141.9600       4.9       209       128        60
OIR    2025250     20200   16.3200  141.9400       4.9       208       111        60
OIR    2025250     20200   16.3200  141.9200       5.0       208       107        60
OIR    2025250     20200   16.3200  141.9000       5.1       207       107        60
OIR    2025250     20200   16.3200  141.8800       5.2       204       107        60
OIR    2025250     20200   16.3200  141.8600       5.4       201       103        60
OIR    2025250     20200   16.3200  141.8400       5.7       198       103        60
OIR    2025250     20200   16.3200  141.8200       5.9       195       103        60
OIR    2025250     20200   16.3200  141.8000       6.1       193       107        60
OIR    2025250     20200   16.3200  141.7800       6.3       192       107        60
OIR    2025250     20200   16.3200  141.7600       6.3       191       115        60
OIR    2025250     20200   16.3200  141.7400       6.4       190       111        60
OIR    2025250     20200   16.3200  141.7200       6.6       189       119        60
OIR    2025250     20200   16.3200  141.7000       6.7       187       119        60
OIR    2025250     20200   16.3200  141.6800       6.8       186       123        60
OIR    2025250     20200   16.3200  141.6600       6.9       186       115        60
OIR    2025250     20200   16.3200  141.6400       7.0       185       128        60
OIR    2025250     20200   16.3200  141.6200       7.0       184       128        60
OIR    2025250     20200   16.3200  141.6000       7.1       184       128        60
OIR    2025250     20200   16.3200  141.5800       7.1       183       132        60
OIR    2025250     20200   16.3200  141.5600       7.2       181       140        60
OIR    2025250     20200   16.3000  142.7200       4.8        25       132        60
OIR    2025250     20200   16.3000  142.7000       4.6        25       132        60
OIR    2025250     20200   16.3000  142.6800       4.5        25       132        60
OIR    2025250     20200   16.3000  142.6600       4.4        25       132        60
OIR    2025250     20200   16.3000  142.6400       4.3        25       123        60
OIR    2025250     20200   16.3000  142.6200       4.1        25       128        60
OIR    2025250     20200   16.3000  142.6000       4.0        25       123        60
OIR    2025250     20200   16.3000  142.0600       4.3       215       136        60
OIR    2025250     20200   16.3000  142.0400       4.5       213       136        60
OIR    2025250     20200   16.3000  142.0200       4.7       211       132        60
OIR    2025250     20200   16.3000  142.0000       4.8       210       132        60
OIR    2025250     20200   16.3000  141.9800       4.8       209       123        60
OIR    2025250     20200   16.3000  141.9600       4.9       209       107        60
OIR    2025250     20200   16.3000  141.9400       4.9       209       115        60
OIR    2025250     20200   16.3000  141.9200       4.9       209       107        60
OIR    2025250     20200   16.3000  141.9000       5.0       208       107        60
OIR    2025250     20200   16.3000  141.8800       5.1       206       107        60
OIR    2025250     20200   16.3000  141.8600       5.3       204       103        60
OIR    2025250     20200   16.3000  141.8400       5.4       201       103        60
OIR    2025250     20200   16.3000  141.8200       5.7       197       107        60
OIR    2025250     20200   16.3000  141.8000       5.9       194       107        60
OIR    2025250     20200   16.3000  141.7800       6.1       193       107        60
OIR    2025250     20200   16.3000  141.7600       6.2       192       107        60
OIR    2025250     20200   16.3000  141.7400       6.3       191       115        60
OIR    2025250     20200   16.3000  141.7200       6.4       190       111        60
OIR    2025250     20200   16.3000  141.7000       6.6       188       111        60
OIR    2025250     20200   16.3000  141.6800       6.6       188       119        60
OIR    2025250     20200   16.3000  141.6600       6.7       187       128        60
OIR    2025250     20200   16.3000  141.6400       6.8       186       132        60
OIR    2025250     20200   16.3000  141.6200       6.9       186       123        60
OIR    2025250     20200   16.3000  141.6000       6.9       185       128        60
OIR    2025250     20200   16.3000  141.5800       7.0       184       132        60
OIR    2025250     20200   16.3000  141.5600       7.1       183       136        60
OIR    2025250     20200   16.2800  142.7200       4.9        24       140        60
OIR    2025250     20200   16.2800  142.7000       4.7        24       136        60
OIR    2025250     20200   16.2800  142.6800       4.5        24       132        60
OIR    2025250     20200   16.2800  142.6600       4.4        24       132        60
OIR    2025250     20200   16.2800  142.6400       4.2        23       123        60
OIR    2025250     20200   16.2800  142.6200       4.0        23       132        60
OIR    2025250     20200   16.2800  142.0600       4.3       215       132        60
OIR    2025250     20200   16.2800  142.0400       4.5       213       128        60
OIR    2025250     20200   16.2800  142.0200       4.7       211       111        60
OIR    2025250     20200   16.2800  142.0000       4.8       210       111        60
OIR    2025250     20200   16.2800  141.9800       4.8       210       111        60
OIR    2025250     20200   16.2800  141.9600       4.9       209       119        60
OIR    2025250     20200   16.2800  141.9400       4.9       209       111        60
OIR    2025250     20200   16.2800  141.9200       4.9       209       107        60
OIR    2025250     20200   16.2800  141.9000       5.0       208       107        60
OIR    2025250     20200   16.2800  141.8800       5.0       207       103        60
OIR    2025250     20200   16.2800  141.8600       5.1       205       103        60
OIR    2025250     20200   16.2800  141.8400       5.3       203       103        60
OIR    2025250     20200   16.2800  141.8200       5.5       200       103        60
OIR    2025250     20200   16.2800  141.8000       5.7       197       107        60
OIR    2025250     20200   16.2800  141.7800       5.8       195       107        60
OIR    2025250     20200   16.2800  141.7600       6.0       193       107        60
OIR    2025250     20200   16.2800  141.7400       6.2       192       115        60
OIR    2025250     20200   16.2800  141.7200       6.3       191       107        60
OIR    2025250     20200   16.2800  141.7000       6.4       190       111        60
OIR    2025250     20200   16.2800  141.6800       6.5       189       128        60
OIR    2025250     20200   16.2800  141.6600       6.6       188       128        60
OIR    2025250     20200   16.2800  141.6400       6.7       187       123        60
OIR    2025250     20200   16.2800  141.6200       6.8       186       132        60
OIR    2025250     20200   16.2800  141.6000       6.9       186       128        60
OIR    2025250     20200   16.2800  141.5800       6.9       185       132        60
OIR    2025250     20200   16.2800  141.5600       7.0       184       140        60
OIR    2025250     20200   16.2600  142.7200       5.0        23       132        60
OIR    2025250     20200   16.2600  142.7000       4.7        23       132        60
OIR    2025250     20200   16.2600  142.6800       4.5        23       128        60
OIR    2025250     20200   16.2600  142.6600       4.3        22       128        60
OIR    2025250     20200   16.2600  142.6400       4.1        22       123        60
OIR    2025250     20200   16.2600  142.1000       4.0       220       140        60
OIR    2025250     20200   16.2600  142.0800       4.1       218       136        60
OIR    2025250     20200   16.2600  142.0600       4.3       216       132        60
OIR    2025250     20200   16.2600  142.0400       4.5       213       111        60
OIR    2025250     20200   16.2600  142.0200       4.7       211       128        60
OIR    2025250     20200   16.2600  142.0000       4.8       210       123        60
OIR    2025250     20200   16.2600  141.9800       4.8       210       119        60
OIR    2025250     20200   16.2600  141.9600       4.8       209       107        60
OIR    2025250     20200   16.2600  141.9400       4.9       209       119        60
OIR    2025250     20200   16.2600  141.9200       4.9       209       107        60
OIR    2025250     20200   16.2600  141.9000       4.9       208       103        60
OIR    2025250     20200   16.2600  141.8800       5.0       207       103        60
OIR    2025250     20200   16.2600  141.8600       5.1       206       103        60
OIR    2025250     20200   16.2600  141.8400       5.1       205       103        60
OIR    2025250     20200   16.2600  141.8200       5.3       203       107        60
OIR    2025250     20200   16.2600  141.8000       5.4       201       107        60
OIR    2025250     20200   16.2600  141.7800       5.6       199       111        60
OIR    2025250     20200   16.2600  141.7600       5.7       197       107        60
OIR    2025250     20200   16.2600  141.7400       5.9       194       107        60
OIR    2025250     20200   16.2600  141.7200       6.1       192       119        60
OIR    2025250     20200   16.2600  141.7000       6.3       191       111        60
OIR    2025250     20200   16.2600  141.6800       6.4       190       128        60
OIR    2025250     20200   16.2600  141.6600       6.5       189       128        60
OIR    2025250     20200   16.2600  141.6400       6.5       188       123        60
OIR    2025250     20200   16.2600  141.6200       6.6       188       111        60
OIR    2025250     20200   16.2600  141.6000       6.7       187       132        60
OIR    2025250     20200   16.2600  141.5800       6.8       186       132        60
OIR    2025250     20200   16.2400  142.7200       5.2        22       132        60
OIR    2025250     20200   16.2400  142.7000       4.8        22       136        60
OIR    2025250     20200   16.2400  142.6800       4.5        21       132        60
OIR    2025250     20200   16.2400  142.6600       4.2        21       128        60
OIR    2025250     20200   16.2400  142.6400       4.0        21       128        60
OIR    2025250     20200   16.2400  142.0800       4.0       220       111        60
OIR    2025250     20200   16.2400  142.0600       4.2       217       128        60
OIR    2025250     20200   16.2400  142.0400       4.4       214       111        60
OIR    2025250     20200   16.2400  142.0200       4.6       211       111        60
OIR    2025250     20200   16.2400  142.0000       4.7       210       123        60
OIR    2025250     20200   16.2400  141.9800       4.8       210       107        60
OIR    2025250     20200   16.2400  141.9600       4.8       209       103        60
OIR    2025250     20200   16.2400  141.9400       4.9       209       107        60
OIR    2025250     20200   16.2400  141.9200       4.9       209       107        60
OIR    2025250     20200   16.2400  141.9000       4.9       209       107        60
OIR    2025250     20200   16.2400  141.8800       5.0       208       111        60
OIR    2025250     20200   16.2400  141.8600       5.0       206       103        60
OIR    2025250     20200   16.2400  141.8400       5.1       205       107        60
OIR    2025250     20200   16.2400  141.8200       5.1       204       107        60
OIR    2025250     20200   16.2400  141.8000       5.2       203       107        60
OIR    2025250     20200   16.2400  141.7800       5.3       202       111        60
OIR    2025250     20200   16.2400  141.7600       5.5       200       107        60
OIR    2025250     20200   16.2400  141.7400       5.7       198       111        60
OIR    2025250     20200   16.2400  141.7200       5.9       195       111        60
OIR    2025250     20200   16.2400  141.7000       6.1       193       111        60
OIR    2025250     20200   16.2400  141.6800       6.2       192       128        60
OIR    2025250     20200   16.2400  141.6600       6.3       191       123        60
OIR    2025250     20200   16.2400  141.6400       6.4       190       128        60
OIR    2025250     20200   16.2400  141.6200       6.4       190       132        60
OIR    2025250     20200   16.2400  141.6000       6.5       190       128        60
OIR    2025250     20200   16.2400  141.5800       6.6       189       136        60
OIR    2025250     20200   16.2200  142.7200       5.4        22       136        60
OIR    2025250     20200   16.2200  142.7000       4.9        21       132        60
OIR    2025250     20200   16.2200  142.6800       4.5        20       136        60
OIR    2025250     20200   16.2200  142.6600       4.2        19       132        60
OIR    2025250     20200   16.2200  142.6400       4.0        19       132        60
OIR    2025250     20200   16.2200  142.0600       4.1       218       123        60
OIR    2025250     20200   16.2200  142.0400       4.3       215       111        60
OIR    2025250     20200   16.2200  142.0200       4.6       212       107        60
OIR    2025250     20200   16.2200  142.0000       4.7       210       119        60
OIR    2025250     20200   16.2200  141.9800       4.8       210       107        60
OIR    2025250     20200   16.2200  141.9600       4.8       210       107        60
OIR    2025250     20200   16.2200  141.9400       4.8       209       107        60
OIR    2025250     20200   16.2200  141.9200       4.9       209       107        60
OIR    2025250     20200   16.2200  141.9000       4.9       209       103        60
OIR    2025250     20200   16.2200  141.8800       4.9       208       103        60
OIR    2025250     20200   16.2200  141.8600       5.0       206       103        60
OIR    2025250     20200   16.2200  141.8400       5.1       205       107        60
OIR    2025250     20200   16.2200  141.8200       5.1       205       107        60
OIR    2025250     20200   16.2200  141.8000       5.2       204       107        60
OIR    2025250     20200   16.2200  141.7800       5.2       203       107        60
OIR    2025250     20200   16.2200  141.7600       5.3       203       111        60
OIR    2025250     20200   16.2200  141.7400       5.5       201       111        60
OIR    2025250     20200   16.2200  141.7200       5.7       198       119        60
OIR    2025250     20200   16.2200  141.7000       5.9       195       119        60
OIR    2025250     20200   16.2200  141.6800       6.1       194       128        60
OIR    2025250     20200   16.2200  141.6600       6.1       193       132        60
OIR    2025250     20200   16.2200  141.6400       6.2       192       128        60
OIR    2025250     20200   16.2200  141.6200       6.3       192       128        60
OIR    2025250     20200   16.2200  141.6000       6.3       192       136        60
OIR    2025250     20200   16.2200  141.5800       6.4       192       136        60
OIR    2025250     20200   16.2000  142.7000       4.9        20       140        60
OIR    2025250     20200   16.2000  142.6800       4.5        18       132        60
OIR    2025250     20200   16.2000  142.6600       4.1        17       140        60
OIR    2025250     20200   16.2000  142.0600       4.0       222       111        60
OIR    2025250     20200   16.2000  142.0400       4.2       217       111        60
OIR    2025250     20200   16.2000  142.0200       4.5       213       107        60
OIR    2025250     20200   16.2000  142.0000       4.7       211       107        60
OIR    2025250     20200   16.2000  141.9800       4.8       210       103        60
OIR    2025250     20200   16.2000  141.9600       4.8       210       107        60
OIR    2025250     20200   16.2000  141.9400       4.8       209       107        60
OIR    2025250     20200   16.2000  141.9200       4.9       209       107        60
OIR    2025250     20200   16.2000  141.9000       4.9       209       103        60
OIR    2025250     20200   16.2000  141.8800       4.9       208       103        60
OIR    2025250     20200   16.2000  141.8600       5.0       206       107        60
OIR    2025250     20200   16.2000  141.8400       5.1       205       107        60
OIR    2025250     20200   16.2000  141.8200       5.1       205       107        60
OIR    2025250     20200   16.2000  141.8000       5.2       204       107        60
OIR    2025250     20200   16.2000  141.7800       5.2       204       119        60
OIR    2025250     20200   16.2000  141.7600       5.3       203       107        60
OIR    2025250     20200   16.2000  141.7400       5.4       202       111        60
OIR    2025250     20200   16.2000  141.7200       5.6       200       119        60
OIR    2025250     20200   16.2000  141.7000       5.8       197       123        60
OIR    2025250     20200   16.2000  141.6800       5.9       196       128        60
OIR    2025250     20200   16.2000  141.6600       6.0       194       128        60
OIR    2025250     20200   16.2000  141.6400       6.1       193       128        60
OIR    2025250     20200   16.2000  141.6200       6.2       193       132        60
OIR    2025250     20200   16.2000  141.6000       6.2       193       132        60
OIR    2025250     20200   16.2000  141.5800       6.3       193       136        60
OIR    2025250     20200   16.1800  142.0400       4.1       221       107        60
OIR    2025250     20200   16.1800  142.0200       4.4       215       107        60
OIR    2025250     20200   16.1800  142.0000       4.7       211       107        60
OIR    2025250     20200   16.1800  141.9800       4.7       211       103        60
OIR    2025250     20200   16.1800  141.9600       4.8       210       107        60
OIR    2025250     20200   16.1800  141.9400       4.8       210       107        60
OIR    2025250     20200   16.1800  141.9200       4.8       209       107        60
OIR    2025250     20200   16.1800  141.9000       4.9       209       103        60
OIR    2025250     20200   16.1800  141.8800       5.0       207       103        60
OIR    2025250     20200   16.1800  141.8600       5.0       206       103        60
OIR    2025250     20200   16.1800  141.8400       5.1       205       107        60
OIR    2025250     20200   16.1800  141.8200       5.1       205       107        60
OIR    2025250     20200   16.1800  141.8000       5.2       204       107        60
OIR    2025250     20200   16.1800  141.7800       5.2       204       107        60
OIR    2025250     20200   16.1800  141.7600       5.3       204       111        60
OIR    2025250     20200   16.1800  141.7400       5.3       203       111        60
OIR    2025250     20200   16.1800  141.7200       5.5       202       123        60
OIR    2025250     20200   16.1800  141.7000       5.6       199       123        60
OIR    2025250     20200   16.1800  141.6800       5.8       198       128        60
OIR    2025250     20200   16.1800  141.6600       5.9       196       128        60
OIR    2025250     20200   16.1800  141.6400       6.0       195       132        60
OIR    2025250     20200   16.1800  141.6200       6.1       194       132        60
OIR    2025250     20200   16.1800  141.6000       6.2       194       136        60
OIR    2025250     20200   16.1800  141.5800       6.2       194       136        60
OIR    2025250     20200   16.1600  142.0200       4.2       218       107        60
OIR    2025250     20200   16.1600  142.0000       4.6       212       107        60
OIR    2025250     20200   16.1600  141.9800       4.7       211       103        60
OIR    2025250     20200   16.1600  141.9600       4.8       210       107        60
OIR    2025250     20200   16.1600  141.9400       4.8       210       107        60
OIR    2025250     20200   16.1600  141.9200       4.8       209       107        60
OIR    2025250     20200   16.1600  141.9000       4.9       209       107        60
OIR    2025250     20200   16.1600  141.8800       4.9       207       103        60
OIR    2025250     20200   16.1600  141.8600       5.0       206       107        60
OIR    2025250     20200   16.1600  141.8400       5.1       205       107        60
OIR    2025250     20200   16.1600  141.8200       5.1       205       107        60
OIR    2025250     20200   16.1600  141.8000       5.2       204       107        60
OIR    2025250     20200   16.1600  141.7800       5.2       204       123        60
OIR    2025250     20200   16.1600  141.7600       5.3       204       123        60
OIR    2025250     20200   16.1600  141.7400       5.3       203       123        60
OIR    2025250     20200   16.1600  141.7200       5.4       202       123        60
OIR    2025250     20200   16.1600  141.7000       5.5       201       128        60
OIR    2025250     20200   16.1600  141.6800       5.6       200       128        60
OIR    2025250     20200   16.1600  141.6600       5.8       198       132        60
OIR    2025250     20200   16.1600  141.6400       5.9       197       132        60
OIR    2025250     20200   16.1600  141.6200       6.0       196       136        60
OIR    2025250     20200   16.1600  141.6000       6.1       195       132        60
OIR    2025250     20200   16.1600  141.5800       6.1       194       136        60
OIR    2025250     20200   16.1400  142.0200       4.1       220       107        60
OIR    2025250     20200   16.1400  142.0000       4.6       213       107        60
OIR    2025250     20200   16.1400  141.9800       4.7       212       107        60
OIR    2025250     20200   16.1400  141.9600       4.7       211       107        60
OIR    2025250     20200   16.1400  141.9400       4.8       210       107        60
OIR    2025250     20200   16.1400  141.9200       4.8       210       107        60
OIR    2025250     20200   16.1400  141.9000       4.9       209       107        60
OIR    2025250     20200   16.1400  141.8800       4.9       208       107        60
OIR    2025250     20200   16.1400  141.8600       5.0       207       107        60
OIR    2025250     20200   16.1400  141.8400       5.1       206       119        60
OIR    2025250     20200   16.1400  141.8200       5.1       205       107        60
OIR    2025250     20200   16.1400  141.8000       5.1       205       115        60
OIR    2025250     20200   16.1400  141.7800       5.2       204       115        60
OIR    2025250     20200   16.1400  141.7600       5.2       204       123        60
OIR    2025250     20200   16.1400  141.7400       5.3       204       128        60
OIR    2025250     20200   16.1400  141.7200       5.4       203       111        60
OIR    2025250     20200   16.1400  141.7000       5.4       203       123        60
OIR    2025250     20200   16.1400  141.6800       5.5       202       132        60
OIR    2025250     20200   16.1400  141.6600       5.6       201       132        60
OIR    2025250     20200   16.1400  141.6400       5.7       199       132        60
OIR    2025250     20200   16.1400  141.6200       5.9       198       136        60
OIR    2025250     20200   16.1400  141.6000       6.0       196       140        60
OIR    2025250     20200   16.1200  142.0200       4.2       221       107        60
OIR    2025250     20200   16.1200  142.0000       4.5       214       107        60
OIR    2025250     20200   16.1200  141.9800       4.7       212       111        60
OIR    2025250     20200   16.1200  141.9600       4.7       212       107        60
OIR    2025250     20200   16.1200  141.9400       4.7       211       107        60
OIR    2025250     20200   16.1200  141.9200       4.8       210       107        60
OIR    2025250     20200   16.1200  141.9000       4.8       209       119        60
OIR    2025250     20200   16.1200  141.8800       4.9       208       107        60
OIR    2025250     20200   16.1200  141.8600       5.0       207       119        60
OIR    2025250     20200   16.1200  141.8400       5.1       206       111        60
OIR    2025250     20200   16.1200  141.8200       5.1       205       119        60
OIR    2025250     20200   16.1200  141.8000       5.1       205       119        60
OIR    2025250     20200   16.1200  141.7800       5.2       205       123        60
OIR    2025250     20200   16.1200  141.7600       5.2       204       123        60
OIR    2025250     20200   16.1200  141.7400       5.3       204       128        60
OIR    2025250     20200   16.1200  141.7200       5.3       204       132        60
OIR    2025250     20200   16.1200  141.7000       5.4       203       132        60
OIR    2025250     20200   16.1200  141.6800       5.4       203       132        60
OIR    2025250     20200   16.1200  141.6600       5.5       203       132        60
OIR    2025250     20200   16.1200  141.6400       5.6       202       123        60
OIR    2025250     20200   16.1200  141.6200       5.7       202       136        60
OIR    2025250     20200   16.1000  142.0200       4.1       224       107        60
OIR    2025250     20200   16.1000  142.0000       4.5       215       107        60
OIR    2025250     20200   16.1000  141.9800       4.6       213       107        60
OIR    2025250     20200   16.1000  141.9600       4.7       212       107        60
OIR    2025250     20200   16.1000  141.9400       4.7       212       107        60
OIR    2025250     20200   16.1000  141.9200       4.7       211       107        60
OIR    2025250     20200   16.1000  141.9000       4.8       210       115        60
OIR    2025250     20200   16.1000  141.8800       4.9       209       111        60
OIR    2025250     20200   16.1000  141.8600       5.0       207       123        60
OIR    2025250     20200   16.1000  141.8400       5.0       206       123        60
OIR    2025250     20200   16.1000  141.8200       5.1       206       119        60
OIR    2025250     20200   16.1000  141.8000       5.1       205       111        60
OIR    2025250     20200   16.1000  141.7800       5.2       205       123        60
OIR    2025250     20200   16.1000  141.7600       5.2       205       128        60
OIR    2025250     20200   16.1000  141.7400       5.3       205       132        60
OIR    2025250     20200   16.1000  141.7200       5.3       204       128        60
OIR    2025250     20200   16.1000  141.7000       5.4       204       132        60
OIR    2025250     20200   16.1000  141.6800       5.4       204       136        60
OIR    2025250     20200   16.1000  141.6600       5.5       204       136        60
OIR    2025250     20200   16.1000  141.6400       5.5       203       132        60
OIR    2025250     20200   16.0800  142.0200       4.0       228       107        60
OIR    2025250     20200   16.0800  142.0000       4.4       218       107        60
OIR    2025250     20200   16.0800  141.9800       4.6       214       107        60
OIR    2025250     20200   16.0800  141.9600       4.6       213       107        60
OIR    2025250     20200   16.0800  141.9400       4.7       212       107        60
OIR    2025250     20200   16.0800  141.9200       4.7       212       115        60
OIR    2025250     20200   16.0800  141.9000       4.7       212       111        60
OIR    2025250     20200   16.0800  141.8800       4.8       210       115        60
OIR    2025250     20200   16.0800  141.8600       4.9       208       119        60
OIR    2025250     20200   16.0800  141.8400       5.0       207       123        60
OIR    2025250     20200   16.0800  141.8200       5.1       206       123        60
OIR    2025250     20200   16.0800  141.8000       5.1       206       119        60
OIR    2025250     20200   16.0800  141.7800       5.1       205       128        60
OIR    2025250     20200   16.0800  141.7600       5.2       205       128        60
OIR    2025250     20200   16.0800  141.7400       5.2       205       132        60
OIR    2025250     20200   16.0800  141.7200       5.3       205       132        60
OIR    2025250     20200   16.0800  141.7000       5.3       205       132        60
OIR    2025250     20200   16.0800  141.6800       5.4       205       136        60
OIR    2025250     20200   16.0800  141.6600       5.4       204       136        60
OIR    2025250     20200   16.0800  141.6400       5.5       204       136        60
OIR    2025250     20200   16.0600  142.0000       4.3       221       107        60
OIR    2025250     20200   16.0600  141.9800       4.5       216       107        60
OIR    2025250     20200   16.0600  141.9600       4.6       214       107        60
OIR    2025250     20200   16.0600  141.9400       4.6       213       119        60
OIR    2025250     20200   16.0600  141.9200       4.7       213       119        60
OIR    2025250     20200   16.0600  141.9000       4.7       213       119        60
OIR    2025250     20200   16.0600  141.8800       4.7       212       111        60
OIR    2025250     20200   16.0600  141.8600       4.8       209       123        60
OIR    2025250     20200   16.0600  141.8400       5.0       208       119        60
OIR    2025250     20200   16.0600  141.8200       5.0       207       111        60
OIR    2025250     20200   16.0600  141.8000       5.1       206       128        60
OIR    2025250     20200   16.0600  141.7800       5.1       206       128        60
OIR    2025250     20200   16.0600  141.7600       5.2       206       132        60
OIR    2025250     20200   16.0600  141.7400       5.2       206       128        60
OIR    2025250     20200   16.0600  141.7200       5.3       205       132        60
OIR    2025250     20200   16.0600  141.7000       5.3       205       136        60
OIR    2025250     20200   16.0600  141.6800       5.4       205       136        60
OIR    2025250     20200   16.0600  141.6600       5.4       205       136        60
OIR    2025250     20200   16.0400  142.0000       4.2       225       111        60
OIR    2025250     20200   16.0400  141.9800       4.4       219       111        60
OIR    2025250     20200   16.0400  141.9600       4.6       216       119        60
OIR    2025250     20200   16.0400  141.9400       4.6       215       123        60
OIR    2025250     20200   16.0400  141.9200       4.6       215       123        60
OIR    2025250     20200   16.0400  141.9000       4.6       215       111        60
OIR    2025250     20200   16.0400  141.8800       4.6       214       123        60
OIR    2025250     20200   16.0400  141.8600       4.7       212       128        60
OIR    2025250     20200   16.0400  141.8400       4.9       209       128        60
OIR    2025250     20200   16.0400  141.8200       5.0       208       128        60
OIR    2025250     20200   16.0400  141.8000       5.1       207       123        60
OIR    2025250     20200   16.0400  141.7800       5.1       207       123        60
OIR    2025250     20200   16.0400  141.7600       5.2       207       132        60
OIR    2025250     20200   16.0400  141.7400       5.2       206       132        60
OIR    2025250     20200   16.0400  141.7200       5.2       206       132        60
OIR    2025250     20200   16.0400  141.7000       5.3       206       136        60
OIR    2025250     20200   16.0200  142.0200       4.0       237       123        60
OIR    2025250     20200   16.0200  142.0000       4.2       229       123        60
OIR    2025250     20200   16.0200  141.9800       4.4       223       123        60
OIR    2025250     20200   16.0200  141.9600       4.5       220       123        60
OIR    2025250     20200   16.0200  141.9400       4.5       218       111        60
OIR    2025250     20200   16.0200  141.9200       4.6       218       119        60
OIR    2025250     20200   16.0200  141.9000       4.6       218       128        60
OIR    2025250     20200   16.0200  141.8800       4.6       217       128        60
OIR    2025250     20200   16.0200  141.8600       4.6       215       128        60
OIR    2025250     20200   16.0200  141.8400       4.8       212       132        60
OIR    2025250     20200   16.0200  141.8200       4.9       210       128        60
OIR    2025250     20200   16.0200  141.8000       5.0       209       132        60
OIR    2025250     20200   16.0200  141.7800       5.1       208       128        60
OIR    2025250     20200   16.0200  141.7600       5.1       208       132        60
OIR    2025250     20200   16.0200  141.7400       5.2       208       136        60
OIR    2025250     20200   16.0000  142.0400       4.0       240       132        60
OIR    2025250     20200   16.0000  142.0200       4.1       238       128        60
OIR    2025250     20200   16.0000  142.0000       4.2       232       123        60
OIR    2025250     20200   16.0000  141.9800       4.3       227       128        60
OIR    2025250     20200   16.0000  141.9600       4.4       224       128        60
OIR    2025250     20200   16.0000  141.9400       4.5       222       128        60
OIR    2025250     20200   16.0000  141.9200       4.5       221       128        60
OIR    2025250     20200   16.0000  141.9000       4.5       221       132        60
OIR    2025250     20200   16.0000  141.8800       4.6       219       123        60
OIR    2025250     20200   16.0000  141.8600       4.6       218       136        60
OIR    2025250     20200   16.0000  141.8400       4.7       215       132        60
OIR    2025250     20200   16.0000  141.8200       4.9       213       132        60
OIR    2025250     20200   16.0000  141.8000       5.0       212       136        60
OIR    2025250     20200   16.0000  141.7800       5.0       211       136        60
OIR    2025250     20200   15.9800  142.0600       4.0       242       128        60
OIR    2025250     20200   15.9800  142.0400       4.1       241       132        60
OIR    2025250     20200   15.9800  142.0200       4.1       239       128        60
OIR    2025250     20200   15.9800  142.0000       4.2       236       132        60
OIR    2025250     20200   15.9800  141.9800       4.3       232       128        60
OIR    2025250     20200   15.9800  141.9600       4.4       229       128        60
OIR    2025250     20200   15.9800  141.9400       4.5       227       132        60
OIR    2025250     20200   15.9800  141.9200       4.5       225       128        60
OIR    2025250     20200   15.9800  141.9000       4.5       224       128        60
OIR    2025250     20200   15.9800  141.8800       4.6       222       132        60
OIR    2025250     20200   15.9800  141.8600       4.7       220       132        60
OIR    2025250     20200   15.9800  141.8400       4.7       218       136        60
OIR    2025250     20200   15.9800  141.8200       4.8       217       136        60
OIR    2025250     20200   15.9800  141.8000       4.9       215       140        60
OIR    2025250     20200   15.9600  142.0800       4.0       244       132        60
OIR    2025250     20200   15.9600  142.0600       4.1       243       132        60
OIR    2025250     20200   15.9600  142.0400       4.1       242       132        60
OIR    2025250     20200   15.9600  142.0200       4.2       240       132        60
OIR    2025250     20200   15.9600  142.0000       4.3       238       128        60
OIR    2025250     20200   15.9600  141.9800       4.4       235       128        60
OIR    2025250     20200   15.9600  141.9600       4.4       233       136        60
OIR    2025250     20200   15.9600  141.9400       4.5       231       132        60
OIR    2025250     20200   15.9600  141.9200       4.5       229       132        60
OIR    2025250     20200   15.9600  141.9000       4.5       227       136        60
OIR    2025250     20200   15.9600  141.8800       4.6       225       132        60
OIR    2025250     20200   15.9600  141.8600       4.7       223       136        60
OIR    2025250     20200   15.9600  141.8400       4.7       221       132        60
OIR    2025250     20200   15.9600  141.8200       4.8       220       136        60
OIR    2025250     20200   15.9400  142.1000       4.0       248       136        60
OIR    2025250     20200   15.9400  142.0800       4.1       245       140        60
OIR    2025250     20200   15.9400  142.0600       4.1       244       136        60
OIR    2025250     20200   15.9400  142.0400       4.2       243       136        60
OIR    2025250     20200   15.9400  142.0200       4.3       241       136        60
OIR    2025250     20200   15.9400  142.0000       4.4       240       136        60
OIR    2025250     20200   15.9400  141.9800       4.4       238       140        60
OIR    2025250     20200   15.9400  141.9600       4.5       236       136        60
OIR    2025250     20200   15.9400  141.9400       4.5       235       136        60
OIR    2025250     20200   15.9400  141.9200       4.5       233       136        60
OIR    2025250     20200   15.9400  141.9000       4.5       231       136        60
OIR    2025250     20200   15.9400  141.8800       4.5       229       140        60
OIR    2025250     20200   15.9200  142.1000       4.0       250       136        60
OIR    2025250     20200   15.9200  142.0800       4.1       247       136        60
OIR    2025250     20200   15.9200  142.0600       4.2       245       140        60
OIR    2025250     20200   15.9200  142.0400       4.3       244       136        60
OIR    2025250     20200   15.9200  142.0200       4.4       243       136        60
OIR    2025250     20200   15.9200  142.0000       4.4       241       136        60
OIR    2025250     20200   15.9200  141.9800       4.5       240       136        60
OIR    2025250     20200   15.9200  141.9600       4.5       239       136        60
OIR    2025250     20200   15.9200  141.9400       4.5       238       136        60
OIR    2025250     20200   15.9200  141.9200       4.5       237       136        60
OIR    2025250     20200   15.9000  142.0200       4.4       245       140        60
OIR    2025250     20200   15.9000  142.0000       4.5       244       140        60
OIR    2025250     20200   15.8800  142.2000       4.0       270       140        60
