type     day        hms     lat       lon         spd        dir       pre        qi
IR     2025250     60200   21.4200  145.6900       7.1       116       894        73
IR     2025250     60200   21.3000  148.7700       5.0        65       978        65
IR     2025250     60200   21.2600  148.7900       5.3        65       982        64
IR     2025250     60200   21.2500  148.7700       5.3        67       981        65
IR     2025250     60200   21.1500  148.4500       4.0        81       982        60
IR     2025250     60200   20.8200  144.0400       9.7       116       872        68
IR     2025250     60200   20.8200  143.7500      10.9       117       811        92
IR     2025250     60200   20.7600  144.1400       9.2       118       863        61
IR     2025250     60200   20.7800  143.6600      10.6       122       813        87
IR     2025250     60200   20.7600  143.6000      10.5       125       838        89
IR     2025250     60200   20.6400  144.2700      12.4       122       792        73
IR     2025250     60200   20.6600  144.1500      11.7       124       793        83
IR     2025250     60200   20.7000  143.8600      13.7       112       752        87
IR     2025250     60200   20.6800  143.8000      13.6       118       759        86
IR     2025250     60200   20.5600  144.2100      12.8       128       754        82
IR     2025250     60200   20.4100  143.1400      13.8       114       766        65
IR     2025250     60200   20.3500  143.1500      15.0       109       773        65
IR     2025250     60200   20.2500  143.3000      14.1       105       805        61
IR     2025250     60200   20.1300  145.5600       7.7       121       897        72
IR     2025250     60200   20.1500  145.5400       7.5       119       894        76
IR     2025250     60200   20.1700  143.3600      11.8       110       820        82
IR     2025250     60200   20.1700  143.2400      13.6       108       819        91
IR     2025250     60200   20.1700  143.1400      13.8       113       825        81
IR     2025250     60200   20.1300  143.0200      12.5       117       858        87
IR     2025250     60200   20.1300  142.9500      10.6       113       870        90
IR     2025250     60200   20.1100  142.8500       9.9       108       875        73
IR     2025250     60200   20.1100  142.7100       9.5       116       866        75
IR     2025250     60200   20.1300  142.6300       9.2       117       870        90
IR     2025250     60200   20.1700  142.6000       9.7       115       873        94
IR     2025250     60200   20.1700  142.4800       9.5       111       879        93
IR     2025250     60200   20.0200  144.8000      12.4       140       764        80
IR     2025250     60200   20.0300  142.8400       8.1       111       853        77
IR     2025250     60200   20.0100  142.7400       7.3       117       850        76
IR     2025250     60200   20.0100  142.6700       6.9       127       851        74
IR     2025250     60200   20.0100  142.6300       6.6       126       857        61
IR     2025250     60200   20.0500  142.5300       6.4       124       870        80
IR     2025250     60200   20.0300  142.2000       6.0       122       880        63
IR     2025250     60200   19.9700  145.4300       8.5       105       893        81
IR     2025250     60200   19.9800  144.8200      12.2       138       763        81
IR     2025250     60200   19.9400  144.1700      13.6       121       742        87
IR     2025250     60200   20.0000  144.0800      11.3       116       780        90
IR     2025250     60200   19.9300  143.3700      10.8       125       829        66
IR     2025250     60200   19.9500  143.3300      10.8       124       828        73
IR     2025250     60200   19.9500  143.1700      10.7       119       841        79
IR     2025250     60200   19.9500  143.0900      10.8       118       846        85
IR     2025250     60200   19.9700  142.7800       6.9       115       849        74
IR     2025250     60200   19.9700  142.7600       6.8       116       849        75
IR     2025250     60200   19.9000  140.8900       7.6       114       912        61
IR     2025250     60200   19.9000  140.7900       8.1       115       912        78
IR     2025250     60200   19.8700  145.4600       7.7        94       888        71
IR     2025250     60200   19.9100  145.4500       8.1        92       899        73
IR     2025250     60200   19.8300  145.3400       8.5       121       841        64
IR     2025250     60200   19.8300  145.2100      10.6       121       840        65
IR     2025250     60200   19.8300  145.0300      12.0       125       767        85
IR     2025250     60200   19.8800  144.8900      12.2       130       755        84
IR     2025250     60200   19.9000  144.8400      12.2       133       740        85
IR     2025250     60200   19.8800  144.2100      14.0       122       735        85
IR     2025250     60200   19.8400  144.1100      11.8       115       736        85
IR     2025250     60200   19.8200  143.9500       8.5       117       736        69
IR     2025250     60200   19.8200  143.8500       8.1       120       751        76
IR     2025250     60200   19.8200  143.7700       9.6       123       803        85
IR     2025250     60200   19.8400  143.7100       9.8       125       820        69
IR     2025250     60200   19.8900  143.2900       9.9       125       832        72
IR     2025250     60200   19.8000  142.0500       5.2       156       336        62
IR     2025250     60200   19.8600  141.5300       9.4       117       903        67
IR     2025250     60200   19.8000  141.4100      10.3       117       903        71
IR     2025250     60200   19.7500  145.4600       7.9       105       868        75
IR     2025250     60200   19.7300  145.2600       8.3       110       763        92
IR     2025250     60200   19.7300  145.1600       9.0       108       766        94
IR     2025250     60200   19.7900  145.0700      11.3       123       761        86
IR     2025250     60200   19.7900  144.9700      11.1       124       746        87
IR     2025250     60200   19.7800  144.3400      13.7       122       737        75
IR     2025250     60200   19.7400  144.2400      12.7       120       735        69
IR     2025250     60200   19.7400  144.0600      10.3       122       734        66
IR     2025250     60200   19.7400  143.9400      10.6       129       736        65
IR     2025250     60200   19.7400  143.7100       9.0       125       809        77
IR     2025250     60200   19.7300  143.5700       9.1       121       835        78
IR     2025250     60200   19.7500  143.5500       9.2       121       836        85
IR     2025250     60200   19.7300  142.0500       5.8       148       342        66
IR     2025250     60200   19.7800  141.4300       9.2       118       902        72
IR     2025250     60200   19.6300  145.5300       8.1       120       814        77
IR     2025250     60200   19.6700  145.4500       7.8       112       795        78
IR     2025250     60200   19.7100  145.4100       7.8       106       788        76
IR     2025250     60200   19.6700  145.2500       8.4       102       760        95
IR     2025250     60200   19.7100  145.1800       8.7       103       765        96
IR     2025250     60200   19.7100  145.0400       9.7       113       748        92
IR     2025250     60200   19.6500  144.9800       9.6       112       739        94
IR     2025250     60200   19.6600  144.4900      11.0       124       739        78
IR     2025250     60200   19.7000  144.3900      11.5       121       742        78
IR     2025250     60200   19.6800  144.3500      11.5       119       739        77
IR     2025250     60200   19.6200  144.2100      10.4       121       733        77
IR     2025250     60200   19.6600  144.1000       9.5       118       730        92
IR     2025250     60200   19.6800  144.0800       9.7       121       732        87
IR     2025250     60200   19.7000  143.9800      10.9       130       732        79
IR     2025250     60200   19.6900  143.6100       9.4       122       830        84
IR     2025250     60200   19.6100  143.2300       6.0       140       277        64
IR     2025250     60200   19.6100  143.1200       6.4       137       264        70
IR     2025250     60200   19.6100  143.1000       6.5       137       263        71
IR     2025250     60200   19.6100  142.9400       5.8       138       271        79
IR     2025250     60200   19.6500  142.8300       5.9       137       288        70
IR     2025250     60200   19.6300  142.7300       6.0       139       289        93
IR     2025250     60200   19.6700  142.5000       4.7       147       336        66
IR     2025250     60200   19.6700  142.4200       4.0       152       325        61
IR     2025250     60200   19.5300  145.7600       7.9        91       860        90
IR     2025250     60200   19.6100  145.4900       7.8       120       784        77
IR     2025250     60200   19.5700  145.3500       8.9       107       752        90
IR     2025250     60200   19.5500  145.2700       9.1       102       749        91
IR     2025250     60200   19.5900  145.2100       9.3       102       753        94
IR     2025250     60200   19.5700  145.0700       8.5       102       742        99
IR     2025250     60200   19.5900  144.9700       9.6       114       736        95
IR     2025250     60200   19.6000  144.5100      10.5       124       733        71
IR     2025250     60200   19.6000  144.4500      10.2       120       736        69
IR     2025250     60200   19.5200  144.3000      10.0       120       734        85
IR     2025250     60200   19.6000  144.2100      10.3       119       732        83
IR     2025250     60200   19.6000  144.1100      10.1       119       729        94
IR     2025250     60200   19.6000  144.0900      10.3       120       729        93
IR     2025250     60200   19.5400  143.7000       5.5       114       339        66
IR     2025250     60200   19.5100  143.2300       7.6       134       257        80
IR     2025250     60200   19.5300  143.1300       8.0       134       258        88
IR     2025250     60200   19.5100  143.0400       8.0       131       262        95
IR     2025250     60200   19.5100  143.0200       7.8       131       267        94
IR     2025250     60200   19.5900  142.9000       5.7       138       276        91
IR     2025250     60200   19.5700  142.7700       6.0       137       298        85
IR     2025250     60200   19.5900  142.7300       6.0       138       299        88
IR     2025250     60200   19.5900  142.6300       6.3       141       336        77
IR     2025250     60200   19.5900  142.1200       7.4       131       333        89
IR     2025250     60200   19.5800  141.7900       7.9       111       718        79
IR     2025250     60200   19.5400  141.7700       7.9       111       704        75
IR     2025250     60200   19.5400  141.6600       7.3       104       714        63
IR     2025250     60200   19.5000  141.5400       6.8       109       741        60
IR     2025250     60200   19.5000  141.4400       6.8       116       821        62
IR     2025250     60200   19.5000  141.2700       7.5       132       877        82
IR     2025250     60200   19.5800  140.9600       7.5       125       872        91
IR     2025250     60200   19.4900  149.1300       7.2         5       969        60
IR     2025250     60200   19.4700  149.0600       7.3         6       964        68
IR     2025250     60200   19.4700  148.9800       7.5        14       951        72
IR     2025250     60200   19.5100  145.7800       8.0        88       873        93
IR     2025250     60200   19.4500  145.7100       6.9        80       800        95
IR     2025250     60200   19.4700  145.5800       6.9        98       778        97
IR     2025250     60200   19.4700  145.5200       6.7       105       769        92
IR     2025250     60200   19.4900  145.4600       7.3       111       765        92
IR     2025250     60200   19.5100  145.2800       8.9       100       744        92
IR     2025250     60200   19.4200  144.4800       9.0       115       731        65
IR     2025250     60200   19.4200  144.4200       9.3       120       730        66
IR     2025250     60200   19.4200  144.3600       9.6       123       729        73
IR     2025250     60200   19.5000  144.2600      10.5       119       731        91
IR     2025250     60200   19.4200  144.0800      11.6       117       727        89
IR     2025250     60200   19.4200  143.8300       6.2       123       340        77
IR     2025250     60200   19.4200  143.7700       6.4       119       325        75
IR     2025250     60200   19.4400  143.5000       7.0       136       254        60
IR     2025250     60200   19.4300  143.4400       6.5       137       252        68
IR     2025250     60200   19.4100  143.3800       7.0       134       258        84
IR     2025250     60200   19.4700  143.2100       8.6       131       259        94
IR     2025250     60200   19.4300  143.1700       9.3       127       265        89
IR     2025250     60200   19.4900  143.0700       8.7       131       261        93
IR     2025250     60200   19.4900  143.0000       7.7       130       283        89
IR     2025250     60200   19.4300  142.5300       7.8       128       828        72
IR     2025250     60200   19.4300  142.3900       7.4       117       768        79
IR     2025250     60200   19.4300  142.3100       9.6       112       709        96
IR     2025250     60200   19.4700  142.2000      10.6       116       671        99
IR     2025250     60200   19.4300  142.0600      10.8       113       699        99
IR     2025250     60200   19.4100  142.0000       9.5       111       729        90
IR     2025250     60200   19.4900  141.9400       7.7       109       707        79
IR     2025250     60200   19.4100  141.7900       8.6       115       721        84
IR     2025250     60200   19.4200  141.7500       8.5       117       706        91
IR     2025250     60200   19.4200  141.6300       9.5       116       690        98
IR     2025250     60200   19.4000  141.5100       8.5       111       718        85
IR     2025250     60200   19.4800  141.3800       7.6       125       826        73
IR     2025250     60200   19.4600  141.2600       8.0       129       872        82
IR     2025250     60200   19.4600  140.9700       9.1       115       859        74
IR     2025250     60200   19.4200  140.8200       9.0       118       860        92
IR     2025250     60200   19.4200  140.8000       8.8       118       860        91
IR     2025250     60200   19.3700  149.3500       5.7        17       955        79
IR     2025250     60200   19.4100  149.2000       6.8       355       947        79
IR     2025250     60200   19.4100  149.1000       7.0         1       940        77
IR     2025250     60200   19.3700  148.9700       5.9         6       939        86
IR     2025250     60200   19.3300  145.4700       6.7       113       752        92
IR     2025250     60200   19.3400  144.4900       8.4       107       725        71
IR     2025250     60200   19.3800  144.4100       9.1       117       727        69
IR     2025250     60200   19.4000  143.8500       6.4       127       340        71
IR     2025250     60200   19.3400  143.8100       6.3       125       322        60
IR     2025250     60200   19.3400  143.6700       7.3       126       268        70
IR     2025250     60200   19.3600  143.5500       7.2       131       250        76
IR     2025250     60200   19.3800  143.5400       7.2       133       251        70
IR     2025250     60200   19.3700  143.2400       8.9       127       271        89
IR     2025250     60200   19.3900  143.1700       9.3       125       277        86
IR     2025250     60200   19.3900  143.0300       8.3       126       309        82
IR     2025250     60200   19.3700  142.9300       7.1       127       331        77
IR     2025250     60200   19.3900  142.5400       8.2       129       843        73
IR     2025250     60200   19.3700  142.4500       8.3       117       833        67
IR     2025250     60200   19.3900  142.3700       8.8       110       768        81
IR     2025250     60200   19.3300  142.3100      10.5       108       750        83
IR     2025250     60200   19.3100  142.1900      13.3       104       746        88
IR     2025250     60200   19.3900  142.1000      11.8       110       711        97
IR     2025250     60200   19.3700  141.9800      10.9       109       791        83
IR     2025250     60200   19.3900  141.8600       9.8       112       773        81
IR     2025250     60200   19.3300  141.8000      10.1       116       838        90
IR     2025250     60200   19.3800  141.7100       9.4       117       706        85
IR     2025250     60200   19.3400  141.5900       9.2       109       714        92
IR     2025250     60200   19.3800  141.5300       8.7       109       711        85
IR     2025250     60200   19.3600  141.3400       8.4       117       818        80
IR     2025250     60200   19.3800  141.2400       8.8       127       870        84
IR     2025250     60200   19.2700  149.3700       5.2         9       933        86
IR     2025250     60200   19.3100  149.2700       6.0         7       940        82
IR     2025250     60200   19.3100  149.2500       6.1         6       939        84
IR     2025250     60200   19.3300  149.1300       7.0         6       853        78
IR     2025250     60200   19.3300  148.9700       6.0         9       912        88
IR     2025250     60200   19.3100  148.9500       5.9        13       916        89
IR     2025250     60200   19.2300  145.6000       7.3       118       747        90
IR     2025250     60200   19.2300  145.4600       7.4       122       720        91
IR     2025250     60200   19.2500  145.2100       9.5       115       723        90
IR     2025250     60200   19.2500  144.8000       9.4       109       739        66
IR     2025250     60200   19.2600  144.6400       9.6       111       732        73
IR     2025250     60200   19.3000  144.5700       9.0       108       726        71
IR     2025250     60200   19.2200  143.7600       6.8       129       270        69
IR     2025250     60200   19.2200  143.7400       6.9       129       263        83
IR     2025250     60200   19.2600  143.6500       7.7       130       252        81
IR     2025250     60200   19.3000  143.5500       7.6       133       247        88
IR     2025250     60200   19.3000  143.4500       8.3       137       253        84
IR     2025250     60200   19.2600  143.3500       8.6       129       292        76
IR     2025250     60200   19.2500  143.2600       8.3       124       303        83
IR     2025250     60200   19.2100  143.1400       6.1       115       319        91
IR     2025250     60200   19.2100  143.0000       4.8       118       328        83
IR     2025250     60200   19.2900  142.4200       9.4       112       853        70
IR     2025250     60200   19.2500  142.3400      11.4       108       844        84
IR     2025250     60200   19.2900  142.2700      11.9       107       783        86
IR     2025250     60200   19.2700  142.1300      13.9       104       825        96
IR     2025250     60200   19.2900  142.1100      13.7       105       816        95
IR     2025250     60200   19.2900  142.0200      13.5       106       855        93
IR     2025250     60200   19.2900  141.8600      11.4       119       861        85
IR     2025250     60200   19.2100  141.7600      10.8       121       869        89
IR     2025250     60200   19.2900  141.6500      10.2       110       814        95
IR     2025250     60200   19.2800  141.5500       9.5       102       784        94
IR     2025250     60200   19.2300  141.5100      10.7       101       806        88
IR     2025250     60200   19.2400  141.4300       9.6       103       793        84
IR     2025250     60200   19.1700  149.4400       5.0       359       912        61
IR     2025250     60200   19.1900  149.3400       5.4        14       841        83
IR     2025250     60200   19.1700  149.3200       5.4        16       831        77
IR     2025250     60200   19.2100  149.1600       6.1        15       863        86
IR     2025250     60200   19.2000  145.7900       8.4       105       858        73
IR     2025250     60200   19.2100  145.6000       7.7       123       732        90
IR     2025250     60200   19.2100  145.4600       7.6       123       718        91
IR     2025250     60200   19.1700  145.2200       9.6       119       727        87
IR     2025250     60200   19.1300  145.1000      11.1       121       717        79
IR     2025250     60200   19.2100  144.9500      10.0       118       729        73
IR     2025250     60200   19.1500  144.9300      11.1       122       732        68
IR     2025250     60200   19.1300  144.5800      12.0       134       622        73
IR     2025250     60200   19.1600  144.4400      10.8       134       402        64
IR     2025250     60200   19.1800  144.2900       7.8       130       365        69
IR     2025250     60200   19.1200  144.1900       6.4       127       327        75
IR     2025250     60200   19.1400  143.8800       5.8       122       266        69
IR     2025250     60200   19.1600  143.8400       6.1       126       265        70
IR     2025250     60200   19.1600  143.6800       6.7       129       257        98
IR     2025250     60200   19.2000  143.6400       7.4       131       253        98
IR     2025250     60200   19.1200  143.5600       6.5       131       279        79
IR     2025250     60200   19.2000  143.4700       8.3       134       285        80
IR     2025250     60200   19.1400  143.2900       7.5       124       311        84
IR     2025250     60200   19.1500  143.0400       4.8       120       331        76
IR     2025250     60200   19.1100  142.4500      11.9       118       890        78
IR     2025250     60200   19.1100  142.4400      12.5       116       889        85
IR     2025250     60200   19.1700  142.2600      12.6       108       863        96
IR     2025250     60200   19.1500  142.2400      13.1       109       864        97
IR     2025250     60200   19.1300  142.0700      14.6       102       866        95
IR     2025250     60200   19.1500  142.0500      14.4       101       861        94
IR     2025250     60200   19.1500  141.9500      13.7       108       876        98
IR     2025250     60200   19.1100  141.8500      13.1       120       881        76
IR     2025250     60200   19.1100  141.6800      13.6       114       852        85
IR     2025250     60200   19.1100  141.6600      13.2       113       846        86
IR     2025250     60200   19.1900  141.4300      10.6       104       816        86
IR     2025250     60200   19.1300  141.2900       9.6       113       895        77
IR     2025250     60200   19.1400  141.0200      11.4       119       886        86
IR     2025250     60200   19.1000  140.9400      12.0       109       877        94
IR     2025250     60200   19.1800  140.8900      12.7       111       879        96
IR     2025250     60200   19.1000  140.7500      13.3       107       881        93
IR     2025250     60200   19.0800  149.6300       4.6       351       941        80
IR     2025250     60200   19.1000  149.5700       5.0       353       912        71
IR     2025250     60200   19.1500  149.3500       5.5        13       823        69
IR     2025250     60200   19.0700  149.2700       5.8        16       808        72
IR     2025250     60200   19.1100  149.1700       5.8        18       839        84
IR     2025250     60200   19.0800  145.7100       9.1       127       755        84
IR     2025250     60200   19.0400  145.6900       8.7       126       720        89
IR     2025250     60200   19.1100  145.5100       8.3       123       713        93
IR     2025250     60200   19.0300  145.4300       7.5        98       722        96
IR     2025250     60200   19.0300  145.3100       8.4       102       728        96
IR     2025250     60200   19.0300  145.2700       8.9       106       728        94
IR     2025250     60200   19.0700  145.1400      11.1       124       721        80
IR     2025250     60200   19.0700  145.0600      12.3       128       715        70
IR     2025250     60200   19.0900  145.0000      12.6       128       720        72
IR     2025250     60200   19.0300  144.8800      13.9       135       731        65
IR     2025250     60200   19.1100  144.7300      13.1       134       658        81
IR     2025250     60200   19.1100  144.7100      12.8       133       654        79
IR     2025250     60200   19.0700  144.5900      11.6       136       611        72
IR     2025250     60200   19.0600  144.0500       5.6       114       280        60
IR     2025250     60200   19.0800  143.8900       5.6       119       257        90
IR     2025250     60200   19.0400  143.8700       5.7       121       250        98
IR     2025250     60200   19.1000  143.7200       6.3       128       265        88
IR     2025250     60200   19.0800  143.6600       6.1       127       274        77
IR     2025250     60200   19.1000  143.5600       6.3       129       283        77
IR     2025250     60200   19.0200  143.4800       6.7       124       309        88
IR     2025250     60200   19.1000  143.3100       7.5       123       314        83
IR     2025250     60200   19.0100  142.4900      14.0       118       363        95
IR     2025250     60200   19.0100  142.3900      14.3       116       370        92
IR     2025250     60200   19.0100  142.3300      14.5       111       367        89
IR     2025250     60200   19.0100  142.2400      16.2       107       390        87
IR     2025250     60200   19.0100  142.1000      18.0       105       425        90
IR     2025250     60200   19.0100  141.9900      15.6       115       437        98
IR     2025250     60200   19.0100  141.9700      15.5       115       436        98
IR     2025250     60200   19.0100  141.8300      12.4       130       419        90
IR     2025250     60200   19.0100  141.7700      10.6       134       414        87
IR     2025250     60200   19.0900  141.6800      14.0       114       850        83
IR     2025250     60200   19.0100  141.5400      11.5       117       814        74
IR     2025250     60200   19.0900  141.4900      11.8       110       840        74
IR     2025250     60200   19.0500  141.3100      10.4       116       895        71
IR     2025250     60200   19.0300  141.2500       9.6       120       896        75
IR     2025250     60200   19.0100  141.1900       8.8       125       896        72
IR     2025250     60200   19.0300  141.1000       9.8       124       896        89
IR     2025250     60200   19.0200  140.9400       9.3       116       888        92
IR     2025250     60200   19.0200  140.8500      11.4       105       871        93
IR     2025250     60200   19.0000  140.7300      13.2       107       866        84
IR     2025250     60200   19.0000  140.7100      13.3       108       866        82
IR     2025250     60200   19.0400  149.6000       4.9       356       935        71
IR     2025250     60200   18.9800  149.5400       5.4        13       849        74
IR     2025250     60200   19.0600  149.4500       5.7         9       813        78
IR     2025250     60200   19.0500  149.3100       6.0        15       804        77
IR     2025250     60200   19.0200  145.6900       8.5       124       718        90
IR     2025250     60200   18.9300  145.5000       6.9        92       720        87
IR     2025250     60200   18.9500  145.4300       7.8        86       728        93
IR     2025250     60200   18.9300  145.3700       9.0        98       729        83
IR     2025250     60200   18.9300  145.2100      11.9       116       716        63
IR     2025250     60200   18.9900  145.1200      12.8       133       709        77
IR     2025250     60200   19.0100  145.1000      12.4       130       710        72
IR     2025250     60200   19.0100  144.9600      13.8       133       720        62
IR     2025250     60200   18.9700  144.6300      10.4       135       568        65
IR     2025250     60200   18.9700  144.5900      10.2       136       373        75
IR     2025250     60200   18.9200  144.2900       7.3       118       258        88
IR     2025250     60200   19.0000  144.2400       7.1       122       275        75
IR     2025250     60200   18.9800  143.9300       5.6       119       250        97
IR     2025250     60200   19.0000  143.8700       5.7       119       249        95
IR     2025250     60200   18.9200  143.6700       6.2       117       315        68
IR     2025250     60200   19.0000  143.5000       6.3       123       314        88
IR     2025250     60200   18.9500  142.8400       8.0       114       860        65
IR     2025250     60200   18.9100  142.7600      15.2       112       397        79
IR     2025250     60200   18.9100  142.6400      16.5       112       391        90
IR     2025250     60200   18.9100  142.6000      16.5       113       390        92
IR     2025250     60200   18.9100  142.4900      15.4       114       365        98
IR     2025250     60200   18.9100  142.4300      15.4       114       362        98
IR     2025250     60200   18.9100  142.3300      15.7       110       362        95
IR     2025250     60200   18.9300  142.2200      16.5       107       380        91
IR     2025250     60200   18.9500  142.0600      17.9       108       406        91
IR     2025250     60200   18.9700  142.0400      17.4       110       409        93
IR     2025250     60200   18.9900  141.8900      14.3       119       418        96
IR     2025250     60200   18.9900  141.8500      13.1       125       418        91
IR     2025250     60200   18.9500  141.7300       9.9       128       415        84
IR     2025250     60200   18.9300  141.6300       8.1       124       419        85
IR     2025250     60200   18.9700  141.4800      10.8       119       816        66
IR     2025250     60200   18.9100  141.4400       7.0       122       438        88
IR     2025250     60200   18.9900  141.1300       8.7       125       896        71
IR     2025250     60200   18.9100  141.0200       7.2       123       866        89
IR     2025250     60200   18.9700  140.9400       7.8       119       875        87
IR     2025250     60200   18.9300  140.8400      11.1       107       863        88
IR     2025250     60200   18.9200  140.7500      12.9       106       853        73
IR     2025250     60200   18.9400  140.6900      13.6       108       855        67
IR     2025250     60200   18.8800  149.6100       4.2        21       919        90
IR     2025250     60200   18.9400  149.5100       5.1        22       828        73
IR     2025250     60200   18.8800  149.4700       5.2        23       812        74
IR     2025250     60200   18.8800  149.3700       5.7        16       797        84
IR     2025250     60200   18.8600  146.1300      10.8        42       898        78
IR     2025250     60200   18.8800  146.0500       9.4        50       871        69
IR     2025250     60200   18.8400  145.9300       7.1        89       768        94
IR     2025250     60200   18.9200  145.7400       8.5       119       695        95
IR     2025250     60200   18.8400  145.6000       6.5        90       707        71
IR     2025250     60200   18.9100  145.4600       7.3        80       731        87
IR     2025250     60200   18.9100  145.3700       9.3        98       730        84
IR     2025250     60200   18.8900  145.3400       9.9       100       729        84
IR     2025250     60200   18.8300  145.2400      12.2        99       712        81
IR     2025250     60200   18.8300  145.0300      14.6       140       687        80
IR     2025250     60200   18.8300  144.3700       8.1       123       240        69
IR     2025250     60200   18.8500  144.2300       7.3       116       254        94
IR     2025250     60200   18.8600  144.1500       7.2       118       275        92
IR     2025250     60200   18.9000  144.0400       6.9       114       268        87
IR     2025250     60200   18.9000  144.0000       7.0       118       264        82
IR     2025250     60200   18.9000  143.6900       6.3       114       318        77
IR     2025250     60200   18.8900  142.6000      17.0       110       415        92
IR     2025250     60200   18.8500  142.4300      16.4       109       373        96
IR     2025250     60200   18.8500  142.4100      16.3       110       374        96
IR     2025250     60200   18.8100  142.2500      16.6       103       380        95
IR     2025250     60200   18.8100  142.1500      16.9       105       381        95
IR     2025250     60200   18.8700  141.6900       9.1       121       420        88
IR     2025250     60200   18.8500  141.6500       8.6       117       415        85
IR     2025250     60200   18.8100  141.5700       9.4       109       416        92
IR     2025250     60200   18.8700  141.4400       7.4       118       428        88
IR     2025250     60200   18.8700  141.3200       5.9       144       434        81
IR     2025250     60200   18.8300  141.0900       6.3       117       862        78
IR     2025250     60200   18.8700  140.9200       7.7       127       865        88
IR     2025250     60200   18.8100  140.7200      12.0       110       859        76
IR     2025250     60200   18.8200  149.6200       4.1        16       933        89
IR     2025250     60200   18.8400  149.5100       4.7        20       885        79
IR     2025250     60200   18.8400  149.4500       5.1        20       830        81
IR     2025250     60200   18.7800  146.1200      11.3        48       898        89
IR     2025250     60200   18.7600  146.0800      10.6        55       880        82
IR     2025250     60200   18.7600  145.9400       7.3        95       785        84
IR     2025250     60200   18.8000  145.9100       7.3        94       739        93
IR     2025250     60200   18.8000  145.7900       7.6       106       685        83
IR     2025250     60200   18.8000  145.6300       7.3        81       701        78
IR     2025250     60200   18.8200  145.5900       6.6        85       711        70
IR     2025250     60200   18.7600  145.4900       7.8        71       751        78
IR     2025250     60200   18.7900  145.3400      11.1        86       740        91
IR     2025250     60200   18.7900  145.3200      12.2        82       731        66
IR     2025250     60200   18.7500  145.1600      13.1       113       691        79
IR     2025250     60200   18.8100  145.0500      14.5       140       687        82
IR     2025250     60200   18.7300  145.0000       8.4       125       604        61
IR     2025250     60200   18.8100  144.8300       9.8       135       412        69
IR     2025250     60200   18.7300  144.6900       5.8       103       284        84
IR     2025250     60200   18.7700  144.5800       6.3       107       266        73
IR     2025250     60200   18.7900  144.4600       6.8       106       236        72
IR     2025250     60200   18.8100  144.3600       8.1       122       240        71
IR     2025250     60200   18.7500  144.3000       8.8       125       242        83
IR     2025250     60200   18.7900  144.1300       8.4       124       301        69
IR     2025250     60200   18.8000  144.0100       7.7       117       311        67
IR     2025250     60200   18.7200  142.4800      20.1        98       381        90
IR     2025250     60200   18.7900  142.3800      17.4       106       376        94
IR     2025250     60200   18.7700  142.3100      17.3       106       373        94
IR     2025250     60200   18.7700  142.2300      16.6       104       376        94
IR     2025250     60200   18.7700  142.1100      17.3       103       374        92
IR     2025250     60200   18.7300  141.9800      14.8       104       407        97
IR     2025250     60200   18.7300  141.9600      14.7       106       409        97
IR     2025250     60200   18.7300  141.8000      10.7       116       447        85
IR     2025250     60200   18.7100  141.7000      11.4       112       419        86
IR     2025250     60200   18.7900  141.5900       9.7       108       415        91
IR     2025250     60200   18.7900  141.5700       9.8       107       415        93
IR     2025250     60200   18.7700  141.4200       8.4       118       421        89
IR     2025250     60200   18.7500  141.3600       7.5       129       425        88
IR     2025250     60200   18.7300  141.2600       7.3       132       423        85
IR     2025250     60200   18.7900  140.7200       9.9       123       424        79
IR     2025250     60200   18.7000  146.2700      10.6        47       909        96
IR     2025250     60200   18.6600  146.1900      10.9        58       880        98
IR     2025250     60200   18.7200  146.0200       9.0        76       853        70
IR     2025250     60200   18.7000  145.9000       7.7       107       671        90
IR     2025250     60200   18.6800  145.7200       7.1        89       682        93
IR     2025250     60200   18.6400  145.6200       7.6        71       739        93
IR     2025250     60200   18.6600  145.5800       7.8        68       743        93
IR     2025250     60200   18.7200  145.3300      11.9       104       753        83
IR     2025250     60200   18.7000  145.2700      12.2       116       714        86
IR     2025250     60200   18.6800  145.2100      12.2       118       701        87
IR     2025250     60200   18.6300  144.7100       5.8        92       252        90
IR     2025250     60200   18.6700  144.6500       5.6        87       251        78
IR     2025250     60200   18.6700  144.4700       6.7       105       231        92
IR     2025250     60200   18.6900  144.4400       7.2       110       233        90
IR     2025250     60200   18.6900  144.3600       8.8       125       238        87
IR     2025250     60200   18.7100  144.2600       9.4       126       253        75
IR     2025250     60200   18.6200  143.2700      12.3       124       362        89
IR     2025250     60200   18.6200  143.2300      12.6       122       372        94
IR     2025250     60200   18.6200  142.7800      16.2       109       392        87
IR     2025250     60200   18.6200  142.7500      17.4       105       368        92
IR     2025250     60200   18.6600  142.4200      18.2        99       376        95
IR     2025250     60200   18.7000  142.3800      17.9       102       381        97
IR     2025250     60200   18.6700  142.1100      16.6       103       371        95
IR     2025250     60200   18.6700  142.0100      14.0       102       383        94
IR     2025250     60200   18.6100  141.9300      11.9       108       358        95
IR     2025250     60200   18.6900  141.7600      10.1       116       427        76
IR     2025250     60200   18.6700  141.6600      11.4       111       408        90
IR     2025250     60200   18.6100  141.5700      10.2       111       381        95
IR     2025250     60200   18.6100  141.5500      10.0       111       380        95
IR     2025250     60200   18.6700  141.4100      10.0       116       400        93
IR     2025250     60200   18.6700  141.3600       9.4       123       417        92
IR     2025250     60200   18.6500  141.2400       9.6       125       420        94
IR     2025250     60200   18.6500  141.1600       9.5       130       435        93
IR     2025250     60200   18.6900  140.7000       9.6       121       457        89
IR     2025250     60200   18.5800  146.1700      11.2        62       853        93
IR     2025250     60200   18.6000  145.9300       8.7       122       593        60
IR     2025250     60200   18.5400  145.6900       6.7       118       708        88
IR     2025250     60200   18.6000  145.6000       7.3        70       773        98
IR     2025250     60200   18.6200  145.2700      11.6       117       714        90
IR     2025250     60200   18.5800  145.0700       7.4       113       618        60
IR     2025250     60200   18.5400  144.9700       7.0       111       384        64
IR     2025250     60200   18.5900  144.8400       6.6       114       282        74
IR     2025250     60200   18.5900  144.7200       5.9        97       244        86
IR     2025250     60200   18.6100  144.6900       5.8        91       241        86
IR     2025250     60200   18.5300  144.5100       6.8       110       234        97
IR     2025250     60200   18.5700  144.4100       7.4       119       242        76
IR     2025250     60200   18.5300  144.3900       8.0       125       252        66
IR     2025250     60200   18.5200  143.4400      11.9       112       309        78
IR     2025250     60200   18.5800  143.3000      12.6       126       336        83
IR     2025250     60200   18.5200  143.2800      13.5       109       330        97
IR     2025250     60200   18.5800  143.1700      13.3       118       375        96
IR     2025250     60200   18.5800  142.8400      17.0       103       338        86
IR     2025250     60200   18.5200  142.7400      16.9        97       305        92
IR     2025250     60200   18.5200  142.7200      16.9        97       303        92
IR     2025250     60200   18.6000  142.2600      16.5       103       359        97
IR     2025250     60200   18.5200  142.1200      17.8       103       325        90
IR     2025250     60200   18.5800  142.0900      16.7       103       343        92
IR     2025250     60200   18.5700  141.9100      11.3       110       346        94
IR     2025250     60200   18.5900  141.8900      11.2       110       352        94
IR     2025250     60200   18.5500  141.5600       8.5       117       360        89
IR     2025250     60200   18.5900  141.5300       9.8       113       374        94
IR     2025250     60200   18.5300  141.3300      11.4       120       410        80
IR     2025250     60200   18.5900  141.2400      10.6       124       427        95
IR     2025250     60200   18.4800  146.0000       9.1       131       587        65
IR     2025250     60200   18.4800  145.8700       8.7       138       582        62
IR     2025250     60200   18.4400  145.7300       6.8       130       605        78
IR     2025250     60200   18.5000  145.6900       7.3       125       695        84
IR     2025250     60200   18.4400  145.2000       9.4       117       639        79
IR     2025250     60200   18.5000  145.0700       7.6       113       615        60
IR     2025250     60200   18.5000  144.9700       7.0       109       376        63
IR     2025250     60200   18.5100  144.4100       7.9       125       251        66
IR     2025250     60200   18.5100  144.3900       8.2       127       262        66
IR     2025250     60200   18.4500  144.0500       7.5       108       380        65
IR     2025250     60200   18.4300  143.9200       9.4       114       321        81
IR     2025250     60200   18.4500  143.9000       9.2       115       323        85
IR     2025250     60200   18.4300  143.7400      10.9       113       293        76
IR     2025250     60200   18.4800  143.3000      14.1       109       319        87
IR     2025250     60200   18.5000  143.2600      14.1       110       329        95
IR     2025250     60200   18.4200  143.0900      14.2       108       323        95
IR     2025250     60200   18.4200  143.0100      14.9       107       304        94
IR     2025250     60200   18.4400  142.9500      15.7       105       303        93
IR     2025250     60200   18.5000  142.8400      16.0       101       305        95
IR     2025250     60200   18.4600  142.7400      15.0       103       284        91
IR     2025250     60200   18.4400  142.6000      11.1       115       275        97
IR     2025250     60200   18.4400  142.5800      10.8       115       273        97
IR     2025250     60200   18.5000  142.3000      15.2       105       319        96
IR     2025250     60200   18.5000  142.1400      18.0       103       323        89
IR     2025250     60200   18.4200  142.0600      17.0       104       324        92
IR     2025250     60200   18.4600  142.0000      14.6       106       333        95
IR     2025250     60200   18.4900  141.3900       9.6       120       378        89
IR     2025250     60200   18.4700  140.8500       7.9       136       364        70
IR     2025250     60200   18.4500  140.8300       7.1       140       339        69
IR     2025250     60200   18.4100  140.6600       7.4       146       309        77
IR     2025250     60200   18.4100  140.6400       7.9       144       316        76
IR     2025250     60200   18.3900  146.2700       9.1        54       851        96
IR     2025250     60200   18.3700  146.0900       8.3       121       598        89
IR     2025250     60200   18.4200  145.9400       8.2       138       584        64
IR     2025250     60200   18.3400  145.8200       5.5       110       585        87
IR     2025250     60200   18.4200  145.7300       6.8       131       603        78
IR     2025250     60200   18.4200  145.7100       7.0       128       658        81
IR     2025250     60200   18.3600  145.1000       8.6       118       623        65
IR     2025250     60200   18.3800  144.9600       7.0       105       317        66
IR     2025250     60200   18.3600  144.8700       6.6       105       258        75
IR     2025250     60200   18.3400  144.7900       7.4       111       240        92
IR     2025250     60200   18.3600  144.6900       7.8       112       230        83
IR     2025250     60200   18.3700  144.5900       8.1       120       235        87
IR     2025250     60200   18.3300  144.5300       7.9       118       265        61
IR     2025250     60200   18.3300  144.1800       9.3        96       403        75
IR     2025250     60200   18.3700  144.1300       8.6        99       378        69
IR     2025250     60200   18.3300  144.0500       9.6       103       341        83
IR     2025250     60200   18.4100  143.9600       9.4       113       329        76
IR     2025250     60200   18.3500  143.8000      12.2       114       288        81
IR     2025250     60200   18.3300  143.7200      11.9       110       286        90
IR     2025250     60200   18.4100  143.3200      14.7       103       308        91
IR     2025250     60200   18.3300  143.1600      14.3       112       285        84
IR     2025250     60200   18.3400  143.1000      14.0       109       286        92
IR     2025250     60200   18.4000  143.0300      14.6       107       294        93
IR     2025250     60200   18.4000  142.9300      15.6       104       283        92
IR     2025250     60200   18.3400  142.8100      13.8       108       261        91
IR     2025250     60200   18.4000  142.7200      13.4       109       265        95
IR     2025250     60200   18.3400  142.6600      10.3       120       251        89
IR     2025250     60200   18.4000  142.3900       9.2       119       273        91
IR     2025250     60200   18.3600  142.2100      13.5       108       281        87
IR     2025250     60200   18.3800  141.9600      11.5       112       338        92
IR     2025250     60200   18.3800  141.9300       9.9       116       342        87
IR     2025250     60200   18.4000  141.6200       4.9       155       365        76
IR     2025250     60200   18.3200  141.3500       8.4       132       370        90
IR     2025250     60200   18.3200  141.2900       7.9       129       377        84
IR     2025250     60200   18.3300  140.9200       7.9       147       339        83
IR     2025250     60200   18.3500  140.8300       6.7       152       310        77
IR     2025250     60200   18.3300  140.8100       7.0       149       307        79
IR     2025250     60200   18.3700  140.6400       8.6       142       318        88
IR     2025250     60200   18.3100  146.1300       8.8       118       608        90
IR     2025250     60200   18.2500  146.1100       8.5       121       606        87
IR     2025250     60200   18.2500  145.9300       5.3       124       583        83
IR     2025250     60200   18.2500  145.8900       4.3       106       583        68
IR     2025250     60200   18.2800  144.9800       7.0       105       316        66
IR     2025250     60200   18.3200  144.9600       6.8       104       304        62
IR     2025250     60200   18.2400  144.7800       8.2       111       247        92
IR     2025250     60200   18.2800  144.7100       7.8       108       242        87
IR     2025250     60200   18.3200  144.5900       7.9       116       250        70
IR     2025250     60200   18.3200  144.5500       7.8       117       265        62
IR     2025250     60200   18.2700  144.2400       9.8        96       382        78
IR     2025250     60200   18.2500  144.1200      11.0        94       342        96
IR     2025250     60200   18.2700  144.0800      10.7        96       340        95
IR     2025250     60200   18.2900  143.9900      11.6       112       308        87
IR     2025250     60200   18.2300  143.8500      12.1       109       284        80
IR     2025250     60200   18.3100  143.7400      12.0       110       286        88
IR     2025250     60200   18.3100  143.6800      12.2       107       283        90
IR     2025250     60200   18.3100  143.3500      15.5       103       305        87
IR     2025250     60200   18.2700  143.2500      14.8       113       286        89
IR     2025250     60200   18.3100  143.1600      14.3       113       281        91
IR     2025250     60200   18.3100  143.1400      14.3       111       278        93
IR     2025250     60200   18.2200  142.8100      13.1       116       244        88
IR     2025250     60200   18.2200  142.7300      12.1       124       239        92
IR     2025250     60200   18.2800  142.6200       9.8       127       243        86
IR     2025250     60200   18.2600  142.5800       9.2       130       240        85
IR     2025250     60200   18.2800  142.4000       8.0       132       252        86
IR     2025250     60200   18.3000  142.3900       8.2       130       257        85
IR     2025250     60200   18.2800  142.2500       9.9       120       267        94
IR     2025250     60200   18.2600  142.1700       9.8       117       278        91
IR     2025250     60200   18.2200  141.9400       6.7       125       363        82
IR     2025250     60200   18.3000  141.3800       8.8       132       370        92
IR     2025250     60200   18.3000  141.2900       7.9       131       375        85
IR     2025250     60200   18.2800  141.2300       8.3       129       376        77
IR     2025250     60200   18.2200  141.1700       9.4       134       357        83
IR     2025250     60200   18.2200  141.0700       8.2       141       354        76
IR     2025250     60200   18.2700  140.9000       6.9       153       333        84
IR     2025250     60200   18.2300  140.6500      10.2       133       366        93
IR     2025250     60200   18.2100  146.3000       7.6        62       866        95
IR     2025250     60200   18.2100  146.1200       9.2       121       607        86
IR     2025250     60200   18.2300  146.1100       8.6       121       605        87
IR     2025250     60200   18.2100  145.9700       6.5       124       584        84
IR     2025250     60200   18.1700  145.8300       5.8        85       590        82
IR     2025250     60200   18.1800  145.4400       9.1        91       718        94
IR     2025250     60200   18.1400  145.0500       6.6        81       320        69
IR     2025250     60200   18.2000  144.9500       7.1       103       288        70
IR     2025250     60200   18.1400  144.8500       8.5       112       257        89
IR     2025250     60200   18.2200  144.7000       7.9       106       254        73
IR     2025250     60200   18.1400  144.2900       8.3        98       350        66
IR     2025250     60200   18.1700  144.2200      10.3        93       348        83
IR     2025250     60200   18.1700  144.0000      12.0        99       296        82
IR     2025250     60200   18.1300  143.8700      12.6       101       281        88
IR     2025250     60200   18.1500  143.8100      12.1       104       282        86
IR     2025250     60200   18.1900  143.4600      16.5        90       301        94
IR     2025250     60200   18.1300  143.3600      14.3       108       268        92
IR     2025250     60200   18.1700  143.1700      14.7       117       248        87
IR     2025250     60200   18.1300  143.0300      15.0       108       237        87
IR     2025250     60200   18.1600  142.5900       8.3       131       233        80
IR     2025250     60200   18.1400  142.3200       6.4       138       240        69
IR     2025250     60200   18.1200  142.0900       6.7       141       256        76
IR     2025250     60200   18.1600  141.9200       6.2       134       301        77
IR     2025250     60200   18.1200  141.6500       5.8       153       373        84
IR     2025250     60200   18.1800  141.3800       9.4       139       400        79
IR     2025250     60200   18.1400  141.2800       9.2       145       362        76
IR     2025250     60200   18.2000  141.2100       9.3       138       351        88
IR     2025250     60200   18.1200  141.0900       9.4       143       317        85
IR     2025250     60200   18.1200  140.9900       7.2       155       307        80
IR     2025250     60200   18.1200  140.9700       7.0       156       307        81
IR     2025250     60200   18.1600  140.8400       7.1       157       341        88
IR     2025250     60200   18.1600  140.7100      10.0       134       389        94
IR     2025250     60200   18.1600  140.6500      10.6       133       467        92
IR     2025250     60200   18.0500  146.3500       7.0        57       860        97
IR     2025250     60200   18.0700  146.2500       6.4        72       813        85
IR     2025250     60200   18.0500  146.1300       7.2        99       586        94
IR     2025250     60200   18.1100  146.1000       8.1       113       594        88
IR     2025250     60200   18.0700  145.9600       7.1       104       582        86
IR     2025250     60200   18.1300  145.9000       6.0        99       584        86
IR     2025250     60200   18.0700  145.3900       8.4        91       690        99
IR     2025250     60200   18.1200  145.2800       8.8        91       692        96
IR     2025250     60200   18.0400  145.1800       8.1        57       415        67
IR     2025250     60200   18.1000  145.0700       6.9        70       330        68
IR     2025250     60200   18.0400  144.9800       8.0        82       315        94
IR     2025250     60200   18.1200  144.8500       8.5       112       260        87
IR     2025250     60200   18.1200  144.8300       8.7       113       259        82
IR     2025250     60200   18.0400  144.2700       8.3        90       327        69
IR     2025250     60200   18.1000  144.2500       8.8        88       340        68
IR     2025250     60200   18.0600  143.9400      11.4        89       280        94
IR     2025250     60200   18.1100  143.8300      12.4       100       282        86
IR     2025250     60200   18.1100  143.3600      14.2       109       261        90
IR     2025250     60200   18.1100  143.3400      14.0       112       258        89
IR     2025250     60200   18.1100  143.2500      14.4       123       244        87
IR     2025250     60200   18.0900  142.9600      13.6       108       230        87
IR     2025250     60200   18.0300  142.6600       9.1       118       235        93
IR     2025250     60200   18.0500  142.5700       7.5       118       238        89
IR     2025250     60200   18.0300  142.4300       6.4       115       242        74
IR     2025250     60200   18.0400  142.0300       6.9       141       238        65
IR     2025250     60200   18.0600  141.9700       6.9       136       244        77
IR     2025250     60200   18.0200  141.8200       6.1       133       254        82
IR     2025250     60200   18.0200  141.7600       5.5       134       268        83
IR     2025250     60200   18.1000  141.6300       6.2       147       397        84
IR     2025250     60200   18.1000  141.3200       8.4       149       428        61
IR     2025250     60200   18.0200  141.2200       7.8       152       399        70
IR     2025250     60200   18.0400  141.1800       8.6       150       351        82
IR     2025250     60200   18.0800  141.0300       7.7       154       304        69
IR     2025250     60200   18.1000  140.9500       6.8       157       306        80
IR     2025250     60200   18.0600  140.9000       6.8       161       309        73
IR     2025250     60200   18.0200  140.8200       7.8       149       341        83
IR     2025250     60200   18.0000  146.4000       7.2        50       885        92
IR     2025250     60200   18.0300  146.3700       6.9        55       863        96
IR     2025250     60200   18.0300  146.2500       6.0        76       808        86
IR     2025250     60200   18.0100  146.1300       6.6        96       580        94
IR     2025250     60200   17.9500  146.0900       6.5        98       578        93
IR     2025250     60200   18.0300  145.9600       7.2       103       580        86
IR     2025250     60200   17.9500  145.8300       8.0        99       588        80
IR     2025250     60200   18.0300  145.4100       8.3        95       689        99
IR     2025250     60200   18.0100  145.2400       7.6       103       683        65
IR     2025250     60200   18.0200  145.1800       8.4        55       388        68
IR     2025250     60200   18.0000  144.9400       8.6        82       302        94
IR     2025250     60200   18.0200  144.8500       8.2        97       274        76
IR     2025250     60200   17.9800  144.2800       8.4       101       319        71
IR     2025250     60200   17.9400  144.2200       9.0        84       314        82
IR     2025250     60200   18.0000  143.9200      11.8        79       276        91
IR     2025250     60200   17.9400  143.8800      14.9        68       278        84
IR     2025250     60200   18.0100  143.5500      12.4        99       265        95
IR     2025250     60200   18.0100  143.5300      12.5       100       261        93
IR     2025250     60200   17.9300  143.3700      13.6       116       233        83
IR     2025250     60200   18.0100  143.2600      14.6       119       233        85
IR     2025250     60200   18.0100  143.1600      15.2       115       229        85
IR     2025250     60200   17.9300  143.1000      13.8       111       226        86
IR     2025250     60200   17.9300  142.8700      10.8       109       228        90
IR     2025250     60200   17.9300  142.7400       9.1       109       231        96
IR     2025250     60200   18.0100  142.6800       9.6       115       234        95
IR     2025250     60200   18.0100  142.3400       5.9       117       246        75
IR     2025250     60200   18.0100  142.3200       5.7       121       247        71
IR     2025250     60200   17.9300  142.1400       7.5       122       253        86
IR     2025250     60200   17.9300  142.1000       8.0       125       251        85
IR     2025250     60200   18.0000  142.0100       6.6       143       235        72
IR     2025250     60200   17.9700  141.9300       6.2       136       230        71
IR     2025250     60200   17.9600  141.8200       6.0       128       233        80
IR     2025250     60200   18.0000  141.2200       7.2       156       424        66
IR     2025250     60200   17.9200  141.1200       5.9       180       371        70
IR     2025250     60200   17.9200  141.0800       6.3       182       340        79
IR     2025250     60200   17.9600  140.9900       7.4       185       296        83
IR     2025250     60200   17.9600  140.7000       8.7       144       372        86
IR     2025250     60200   17.8600  146.2600       6.9        54       880        90
IR     2025250     60200   17.8600  146.1200       4.6        71       570        82
IR     2025250     60200   17.9100  146.1100       5.6        92       575        91
IR     2025250     60200   17.8600  146.0000       5.6        76       573        76
IR     2025250     60200   17.8700  145.8900       7.0        82       583        68
IR     2025250     60200   17.8500  145.4600       6.6        82       637        76
IR     2025250     60200   17.9100  145.4200       6.6        97       637        85
IR     2025250     60200   17.8900  145.2500       7.4        99       682        60
IR     2025250     60200   17.9300  145.1500       8.6        63       330        78
IR     2025250     60200   17.8900  145.1100       8.5        76       330        84
IR     2025250     60200   17.8700  145.0300       8.2        91       330        97
IR     2025250     60200   17.9000  144.3200       8.4       113       327        73
IR     2025250     60200   17.8800  144.2400       8.7        83       316        90
IR     2025250     60200   17.9200  144.2000       9.1        77       308        87
IR     2025250     60200   17.9200  144.1100      10.9        59       291        93
IR     2025250     60200   17.9000  143.7000      15.3        74       269        81
IR     2025250     60200   17.8600  143.4700      12.5       117       232        79
IR     2025250     60200   17.8900  143.4300      13.0       117       234        79
IR     2025250     60200   17.8600  143.3300      13.2       117       226        84
IR     2025250     60200   17.8700  143.2000      12.5       110       224        87
IR     2025250     60200   17.9100  143.1200      13.5       111       225        86
IR     2025250     60200   17.8500  143.0200      12.0       106       224        89
IR     2025250     60200   17.8900  142.9100      11.6       107       226        90
IR     2025250     60200   17.9100  142.7900       9.2       108       229        92
IR     2025250     60200   17.9100  142.7700       9.0       108       229        93
IR     2025250     60200   17.9100  142.6200       8.0       106       235        93
IR     2025250     60200   17.9100  142.5100       8.8       101       239        86
IR     2025250     60200   17.8700  142.4500       9.6        94       240        84
IR     2025250     60200   17.9100  142.1400       7.6       116       254        87
IR     2025250     60200   17.9100  142.1200       7.9       117       254        86
IR     2025250     60200   17.8500  141.9600       6.7       112       252        89
IR     2025250     60200   17.8500  141.9300       5.8       111       247        87
IR     2025250     60200   17.8300  141.8300       5.6       103       231        85
IR     2025250     60200   17.8500  141.6600       6.9       110       222        84
IR     2025250     60200   17.8300  141.5000       4.3       121       236        82
IR     2025250     60200   17.9000  141.1000       5.9       185       370        75
IR     2025250     60200   17.9000  141.0500       6.4       186       320        84
IR     2025250     60200   17.8800  140.9500       7.5       179       303        83
IR     2025250     60200   17.8200  140.6400       9.4       148       340        86
IR     2025250     60200   17.8400  146.1200       4.3        67       570        78
IR     2025250     60200   17.7600  145.9400       5.7        55       580        77
IR     2025250     60200   17.7600  145.9200       6.2        52       580        85
IR     2025250     60200   17.7500  145.7500      11.4        37       707        67
IR     2025250     60200   17.8100  145.6500       8.2        65       627        87
IR     2025250     60200   17.8300  145.6300       8.1        72       625        93
IR     2025250     60200   17.7900  145.4600       6.4        76       638        78
IR     2025250     60200   17.7900  145.4400       6.3        82       638        89
IR     2025250     60200   17.7500  145.1600       8.9        89       333        86
IR     2025250     60200   17.7900  145.0700       8.6        95       330        89
IR     2025250     60200   17.8100  144.9700       8.2        99       322        84
IR     2025250     60200   17.8300  144.9500       8.2        97       320        81
IR     2025250     60200   17.7700  144.6200       6.4        90       226        75
IR     2025250     60200   17.8200  144.4300       9.7       125       314        64
IR     2025250     60200   17.7400  144.1900       8.5        67       292        93
IR     2025250     60200   17.7400  144.1000       9.7        59       283        95
IR     2025250     60200   17.8000  144.0000       9.8        69       269        79
IR     2025250     60200   17.7400  143.9200      11.7        68       254        87
IR     2025250     60200   17.8000  143.7700      14.9        72       253        68
IR     2025250     60200   17.8200  143.7300      14.4        77       253        66
IR     2025250     60200   17.7600  143.4600      12.7       121       222        81
IR     2025250     60200   17.7400  143.3800      11.7       122       219        74
IR     2025250     60200   17.7800  143.3100      11.8       116       220        78
IR     2025250     60200   17.8200  143.2300      11.6       108       222        86
IR     2025250     60200   17.8100  143.0800      12.0       107       222        88
IR     2025250     60200   17.7700  142.9800      12.3       107       220        85
IR     2025250     60200   17.7900  142.9400      12.5       107       222        86
IR     2025250     60200   17.8100  142.8700      12.0       105       222        88
IR     2025250     60200   17.7900  142.6900       8.5       106       217        88
IR     2025250     60200   17.7500  142.6000       6.1       106       209        71
IR     2025250     60200   17.8100  142.5600       7.6       103       222        82
IR     2025250     60200   17.8100  142.4200       8.6        91       231        89
IR     2025250     60200   17.7500  142.3100       6.5        91       224        88
IR     2025250     60200   17.7500  142.2900       6.3        90       227        86
IR     2025250     60200   17.8100  142.1200       7.1       101       255        82
IR     2025250     60200   17.7900  142.1000       7.1        98       255        80
IR     2025250     60200   17.7500  141.8100       6.3        84       254        85
IR     2025250     60200   17.7700  141.6600       7.2        96       211        85
IR     2025250     60200   17.8100  141.5800       6.0       107       215        86
IR     2025250     60200   17.7900  141.1800       4.3       191       409        76
IR     2025250     60200   17.7500  141.1200       4.9       191       412        76
IR     2025250     60200   17.8000  140.9900       7.2       187       367        81
IR     2025250     60200   17.7800  140.9500       7.8       178       359        80
IR     2025250     60200   17.7800  140.8300       8.2       173       316        82
IR     2025250     60200   17.7400  140.7500       8.6       164       322        84
IR     2025250     60200   17.6600  146.0900       6.7        29       586        83
IR     2025250     60200   17.6600  145.9500       6.7        37       576        80
IR     2025250     60200   17.7400  145.9000       6.8        47       582        84
IR     2025250     60200   17.6800  145.8400       8.8        46       604        84
IR     2025250     60200   17.6600  145.6800      12.9        33       678        84
IR     2025250     60200   17.7300  145.6500      12.1        34       686        75
IR     2025250     60200   17.7100  145.5500      12.0        32       672        72
IR     2025250     60200   17.7300  145.3900       8.1        58       675        70
IR     2025250     60200   17.6500  145.1800       9.3        70       357        87
IR     2025250     60200   17.7100  145.1600       9.0        88       334        85
IR     2025250     60200   17.7300  145.0300       8.9       108       330        85
IR     2025250     60200   17.7300  144.9700       8.6       111       325        80
IR     2025250     60200   17.6500  144.4400       7.6       104       290        87
IR     2025250     60200   17.7100  144.4100       8.1       117       294        79
IR     2025250     60200   17.7000  144.3100       6.6       107       303        81
IR     2025250     60200   17.6500  144.2100       7.1        71       275        90
IR     2025250     60200   17.7200  144.0800       9.4        64       277        96
IR     2025250     60200   17.7000  144.0000       9.3        83       254        70
IR     2025250     60200   17.7200  143.7300      14.1        81       243        76
IR     2025250     60200   17.6800  143.4400      10.7       120       218        83
IR     2025250     60200   17.7200  143.3800      11.3       122       218        77
IR     2025250     60200   17.6600  143.2500       9.1       112       209        86
IR     2025250     60200   17.7000  143.1700      10.1       110       211        87
IR     2025250     60200   17.7200  143.0600      11.5       107       207        90
IR     2025250     60200   17.6600  142.9800      13.3       109       194        94
IR     2025250     60200   17.6800  142.8600      13.5       107       193        94
IR     2025250     60200   17.7100  142.7300       8.8       108       196        81
IR     2025250     60200   17.6900  142.6300       6.2       110       195        67
IR     2025250     60200   17.6700  142.6100       6.0       109       192        67
IR     2025250     60200   17.6300  142.4600       4.0       109       191        66
IR     2025250     60200   17.6900  142.3400       5.8        94       208        77
IR     2025250     60200   17.7100  142.3300       6.2        92       214        79
IR     2025250     60200   17.6900  142.1500       6.0        89       231        83
IR     2025250     60200   17.7100  142.0600       7.8        85       247        78
IR     2025250     60200   17.6900  141.9800       7.9        80       254        83
IR     2025250     60200   17.6300  141.9000       7.2        71       253        80
IR     2025250     60200   17.6700  141.7700       7.2        76       259        86
IR     2025250     60200   17.6900  141.7300       7.0        77       246        84
IR     2025250     60200   17.6300  141.6500       6.3        79       245        82
IR     2025250     60200   17.6500  141.5400       5.6        95       211        83
IR     2025250     60200   17.6900  141.4400       4.9       124       213        74
IR     2025250     60200   17.6300  141.1700       5.1       171       236        84
IR     2025250     60200   17.6500  141.0000       6.6       159       420        76
IR     2025250     60200   17.6500  140.9800       6.9       158       432        76
IR     2025250     60200   17.6300  140.8100       9.1       161       355        90
IR     2025250     60200   17.6300  140.7900       9.3       160       348        91
IR     2025250     60200   17.6500  140.6700       9.3       157       340        94
IR     2025250     60200   17.6000  146.2000       9.5        38       936        93
IR     2025250     60200   17.6400  146.0700       7.2        28       585        83
IR     2025250     60200   17.6400  145.9300       6.8        35       574        81
IR     2025250     60200   17.6400  145.7600      11.7        38       663        84
IR     2025250     60200   17.6000  145.6600      11.8        36       683        75
IR     2025250     60200   17.5600  145.6400      11.3        40       673        81
IR     2025250     60200   17.5600  145.5400       9.6        44       633        70
IR     2025250     60200   17.5800  145.4400      10.1        41       674        75
IR     2025250     60200   17.5700  145.1700       9.8        60       407        90
IR     2025250     60200   17.5500  145.1300       9.7        61       396        90
IR     2025250     60200   17.6300  145.0600       8.6        84       343        94
IR     2025250     60200   17.5500  144.8800      11.4        37       708        68
IR     2025250     60200   17.5700  144.8600      11.3        36       708        72
IR     2025250     60200   17.5500  144.6900       6.0        79       271        66
IR     2025250     60200   17.5500  144.6100       6.2        82       265        72
IR     2025250     60200   17.5700  144.4000       6.9       103       280        84
IR     2025250     60200   17.5500  144.2200       7.0        65       265        89
IR     2025250     60200   17.6300  144.2100       7.1        71       271        90
IR     2025250     60200   17.5500  144.1100       7.8        79       256        71
IR     2025250     60200   17.5500  143.9300       9.4       132       231        72
IR     2025250     60200   17.6200  143.8400      12.0       149       233        65
IR     2025250     60200   17.6200  143.6500      10.9       124       225        81
IR     2025250     60200   17.6200  143.4400       9.2       118       216        82
IR     2025250     60200   17.6200  143.3200       9.1       120       209        77
IR     2025250     60200   17.5600  143.2000       9.6       117       195        89
IR     2025250     60200   17.5600  143.1100      11.3       115       188        92
IR     2025250     60200   17.5400  142.9900      13.8       109       176        93
IR     2025250     60200   17.6200  142.9000      14.3       106       184        97
IR     2025250     60200   17.5800  142.8200      15.7        99       173        88
IR     2025250     60200   17.5800  142.7200      11.9        99       170        75
IR     2025250     60200   17.6200  142.6100       6.2       108       175        65
IR     2025250     60200   17.5700  142.0300       4.7        70       222        62
IR     2025250     60200   17.5300  142.0100       4.2        68       217        64
IR     2025250     60200   17.5500  141.8600       7.1        70       244        81
IR     2025250     60200   17.6100  141.7500       7.0        70       261        82
IR     2025250     60200   17.5700  141.6500       7.1        78       258        84
IR     2025250     60200   17.5300  141.5500       5.9        90       243        77
IR     2025250     60200   17.5300  141.5300       5.9        95       231        72
IR     2025250     60200   17.6100  140.8100       9.4       159       368        89
IR     2025250     60200   17.4800  146.2000      10.2        36       940        99
IR     2025250     60200   17.5400  145.5200       9.1        45       631        72
IR     2025250     60200   17.4600  145.4000       9.3        44       626        88
IR     2025250     60200   17.4600  145.3600       9.8        44       626        87
IR     2025250     60200   17.5400  145.1900       9.9        56       466        82
IR     2025250     60200   17.5300  145.1300       9.7        60       408        88
IR     2025250     60200   17.5300  145.0700       9.5        63       386        91
IR     2025250     60200   17.4500  144.9300      12.1        35       712        85
IR     2025250     60200   17.5100  144.8800      12.2        33       709        70
IR     2025250     60200   17.4700  144.6300       6.5        65       265        70
IR     2025250     60200   17.5100  144.5700       5.9       100       266        73
IR     2025250     60200   17.4500  144.4300       7.1        70       262        91
IR     2025250     60200   17.5300  144.2200       7.1        63       264        90
IR     2025250     60200   17.4900  143.8900       7.2       131       230        80
IR     2025250     60200   17.5300  143.8600       8.4       137       230        78
IR     2025250     60200   17.4500  143.7400      14.8        50       226        94
IR     2025250     60200   17.4800  143.5900      12.4        67       217        68
IR     2025250     60200   17.5000  143.5700      10.8        79       216        62
IR     2025250     60200   17.5200  143.4700       8.7       113       211        80
IR     2025250     60200   17.5000  143.3000       8.9       125       196        82
IR     2025250     60200   17.5200  143.2800       8.9       123       196        82
IR     2025250     60200   17.4400  143.1200      10.5       119       176        88
IR     2025250     60200   17.5000  143.0700      12.0       117       180        92
IR     2025250     60200   17.4400  142.9700      13.4       109       167        89
IR     2025250     60200   17.4600  142.8900      14.3       106       164        89
IR     2025250     60200   17.4800  142.7200      14.3        97       161        79
IR     2025250     60200   17.4800  142.7000      13.8        98       161        78
IR     2025250     60200   17.5000  142.6100      10.4       102       164        63
IR     2025250     60200   17.5000  142.4900       6.6       117       166        65
IR     2025250     60200   17.4600  142.3500       5.9       136       171        78
IR     2025250     60200   17.4400  142.3200       5.9       139       172        78
IR     2025250     60200   17.4500  141.2200       6.5       165       218        65
IR     2025250     60200   17.4300  141.0700       7.9       158       229        82
IR     2025250     60200   17.5100  140.7700       9.8       154       422        80
IR     2025250     60200   17.4200  145.3800       9.9        43       624        87
IR     2025250     60200   17.4400  145.3600       9.8        43       625        87
IR     2025250     60200   17.4000  145.0700       9.8        50       446        75
IR     2025250     60200   17.3600  144.8900      12.3        32       718        85
IR     2025250     60200   17.3800  144.8700      12.8        29       715        85
IR     2025250     60200   17.4100  144.7000       6.9        49       261        73
IR     2025250     60200   17.4300  144.6200       7.0        52       261        72
IR     2025250     60200   17.4300  144.5900       5.7        69       259        69
IR     2025250     60200   17.3900  144.4300       8.5        48       251        87
IR     2025250     60200   17.3700  144.1400       6.4        77       254        83
IR     2025250     60200   17.4300  143.9100       6.1       119       230        77
IR     2025250     60200   17.4300  143.8300       5.8       111       229        81
IR     2025250     60200   17.3700  143.7000      15.9        42       222        79
IR     2025250     60200   17.3500  143.6200      15.6        52       214        74
IR     2025250     60200   17.3500  143.1200       9.8       121       168        86
IR     2025250     60200   17.4200  142.9900      12.9       111       164        88
IR     2025250     60200   17.4000  142.9100      13.0       107       158        87
IR     2025250     60200   17.3600  142.8300      13.2       106       153        87
IR     2025250     60200   17.3400  142.7300      14.7       107       154        82
IR     2025250     60200   17.3400  142.6200      14.6       113       158        83
IR     2025250     60200   17.3400  142.4700      13.0       129       163        84
IR     2025250     60200   17.3600  142.3700      10.0       138       168        75
IR     2025250     60200   17.4200  142.2800       4.9       142       174        76
IR     2025250     60200   17.3800  142.2200       4.6       153       175        84
IR     2025250     60200   17.3400  142.1600       4.5       164       183        82
IR     2025250     60200   17.3600  141.7000       5.5        76       240        72
IR     2025250     60200   17.3400  141.6800       5.4        80       240        75
IR     2025250     60200   17.4000  141.5900       5.4       107       263        84
IR     2025250     60200   17.3400  140.9500       8.2       174       243        71
IR     2025250     60200   17.4100  140.8600       7.6       177       386        75
IR     2025250     60200   17.3300  140.7800       7.9       186       359        84
IR     2025250     60200   17.3900  140.6100       9.0       151       377        86
IR     2025250     60200   17.3200  145.3700      11.3        38       613        86
IR     2025250     60200   17.2800  145.0600      10.3        44       746        83
IR     2025250     60200   17.2600  144.9000      11.0        36       737        84
IR     2025250     60200   17.2600  144.8500      12.4        28       731        73
IR     2025250     60200   17.3400  144.5600       6.6        49       243        75
IR     2025250     60200   17.2600  144.4200      11.3        26       243        73
IR     2025250     60200   17.3100  144.3300      11.2        32       255        84
IR     2025250     60200   17.3300  144.2500      10.3        45       256        81
IR     2025250     60200   17.3100  144.1900       8.9        54       255        88
IR     2025250     60200   17.3300  143.9200       4.1        75       231        61
IR     2025250     60200   17.3100  143.6400      15.6        50       213        69
IR     2025250     60200   17.3300  143.3500       8.9       135       182        85
IR     2025250     60200   17.2500  143.1700       8.3       123       162        85
IR     2025250     60200   17.2500  143.1500       8.4       123       160        85
IR     2025250     60200   17.3300  143.0200      11.1       116       154        86
IR     2025250     60200   17.2900  142.9600      10.6       112       142        86
IR     2025250     60200   17.2500  142.7900      12.8       116       144        75
IR     2025250     60200   17.2700  142.7300      14.6       115       148        78
IR     2025250     60200   17.2500  142.6000      13.4       130       154        87
IR     2025250     60200   17.2600  142.5800      14.0       129       157        86
IR     2025250     60200   17.2800  142.4800      13.8       137       162        82
IR     2025250     60200   17.2600  142.3100       9.5       147       170        69
IR     2025250     60200   17.2400  142.2300       6.1       152       174        73
IR     2025250     60200   17.2800  142.1600       5.0       163       182        81
IR     2025250     60200   17.3200  142.0600       4.3       176       188        84
IR     2025250     60200   17.2400  141.9800       5.4       187       190        83
IR     2025250     60200   17.2400  141.5600       4.1       128       254        69
IR     2025250     60200   17.2400  141.5200       4.2       141       262        80
IR     2025250     60200   17.3000  140.9100       8.3       182       265        76
IR     2025250     60200   17.2800  140.8800       8.2       193       302        74
IR     2025250     60200   17.2400  140.7200       7.0       194       349        83
IR     2025250     60200   17.2400  140.7000       6.7       190       347        85
IR     2025250     60200   17.2400  145.0800      10.3        45       824        89
IR     2025250     60200   17.2400  145.0600      10.5        42       824        91
IR     2025250     60200   17.1800  144.9200      11.2        33       856        96
IR     2025250     60200   17.1600  144.5900      10.6        21       276        82
IR     2025250     60200   17.1600  144.5700      11.4        18       268        85
IR     2025250     60200   17.2000  144.4200      12.5        19       244        76
IR     2025250     60200   17.1600  144.2100       7.3        60       261        81
IR     2025250     60200   17.1700  143.9000       6.2        54       222        85
IR     2025250     60200   17.2300  143.8100      10.8        32       220        89
IR     2025250     60200   17.1700  143.5700       8.1       129       198        76
IR     2025250     60200   17.1500  143.5100       8.9       131       191        79
IR     2025250     60200   17.1500  143.4400       8.2       138       180        82
IR     2025250     60200   17.2100  143.3600       7.7       137       172        84
IR     2025250     60200   17.1900  143.1900       8.2       122       157        85
IR     2025250     60200   17.2300  143.1700       8.4       123       160        85
IR     2025250     60200   17.1900  143.0500       9.4       112       141        76
IR     2025250     60200   17.1900  142.7100      11.7       127       142        74
IR     2025250     60200   17.1700  142.6100      10.1       151       141        87
IR     2025250     60200   17.1700  142.5700      10.4       158       142        88
IR     2025250     60200   17.1900  142.4800      11.3       165       159        74
IR     2025250     60200   17.1500  142.4000      10.6       184       162        64
IR     2025250     60200   17.2200  142.2300       6.1       156       174        74
IR     2025250     60200   17.1800  142.1500       5.0       162       182        75
IR     2025250     60200   17.1800  142.0400       5.9       185       188        83
IR     2025250     60200   17.1400  141.9400       6.8       195       190        85
IR     2025250     60200   17.1400  141.9200       6.9       196       190        85
IR     2025250     60200   17.2000  141.5200       4.3       135       258        77
IR     2025250     60200   17.1400  141.3900       4.3       152       281        79
IR     2025250     60200   17.2200  141.1800       6.7       180       289        80
IR     2025250     60200   17.2200  141.1600       7.1       176       287        78
IR     2025250     60200   17.1400  141.0400       7.5       174       289        79
IR     2025250     60200   17.2200  140.8900       8.3       195       283        80
IR     2025250     60200   17.1600  140.8300       8.2       201       323        82
IR     2025250     60200   17.2000  140.7000       6.7       197       343        85
IR     2025250     60200   17.1800  140.6800       6.5       198       343        86
IR     2025250     60200   17.0700  145.0500      12.5        24       866        94
IR     2025250     60200   17.1200  144.9600      11.1        31       870        98
IR     2025250     60200   17.0600  144.9300      11.8        25       869        97
IR     2025250     60200   17.0600  144.8200       6.3        55       345        71
IR     2025250     60200   17.0800  144.7200       7.4        51       335        72
IR     2025250     60200   17.0800  144.5700      13.8        18       295        84
IR     2025250     60200   17.0600  144.5500      15.0        16       297        85
IR     2025250     60200   17.1400  144.4000      13.1        16       251        79
IR     2025250     60200   17.1000  144.2800       9.7        30       269        89
IR     2025250     60200   17.0800  144.2400       8.3        38       266        90
IR     2025250     60200   17.0800  143.9700       7.3        52       225        86
IR     2025250     60200   17.1200  143.9000       8.4        33       219        96
IR     2025250     60200   17.0600  143.7200      12.6        23       206        84
IR     2025250     60200   17.0800  143.7000       9.7        30       205        77
IR     2025250     60200   17.1100  143.5300       7.4        99       192        71
IR     2025250     60200   17.0500  143.4100       5.0        76       171        74
IR     2025250     60200   17.1300  143.2400       7.3       120       159        84
IR     2025250     60200   17.1300  143.2200       7.4       118       156        84
IR     2025250     60200   17.0700  142.7200       6.4       129       143        67
IR     2025250     60200   17.0500  142.6100       7.3       174       133        82
IR     2025250     60200   17.1300  142.5000      10.9       181       142        77
IR     2025250     60200   17.0900  142.3800      10.4       202       157        84
IR     2025250     60200   17.0900  142.3600       9.8       200       160        84
IR     2025250     60200   17.0900  142.2700       7.3       183       170        84
IR     2025250     60200   17.0500  142.0900       4.8       169       185        68
IR     2025250     60200   17.1300  142.0000       6.5       192       188        85
IR     2025250     60200   17.1100  141.9000       7.5       198       191        85
IR     2025250     60200   17.0900  141.8800       7.9       198       191        85
IR     2025250     60200   17.0500  141.7100       7.0       194       199        79
IR     2025250     60200   17.0500  141.6900       6.7       193       201        76
IR     2025250     60200   17.1200  141.4300       4.1       132       270        76
IR     2025250     60200   17.0800  141.1600       6.7       168       298        66
IR     2025250     60200   17.0600  141.1200       7.3       168       299        68
IR     2025250     60200   17.0600  141.0000       8.0       174       293        82
IR     2025250     60200   17.0600  140.9500       8.7       175       293        85
IR     2025250     60200   17.1000  140.7800       8.4       193       332        85
IR     2025250     60200   17.1000  140.7600       8.2       194       335        86
IR     2025250     60200   17.1200  140.6200       6.1       200       337        80
IR     2025250     60200   16.9900  144.9500      12.7        22       856        89
IR     2025250     60200   16.9700  144.7500       8.2        44       333        92
IR     2025250     60200   16.9700  144.6400      13.5        24       333        85
IR     2025250     60200   17.0200  144.5500      15.5        17       307        84
IR     2025250     60200   17.0000  144.4300      14.8        13       282        84
IR     2025250     60200   17.0400  144.2000       7.6        35       265        89
IR     2025250     60200   17.0000  143.9100      11.2        26       217        88
IR     2025250     60200   17.0000  143.7600      15.0        17       208        80
IR     2025250     60200   17.0400  143.7000      11.4        25       203        79
IR     2025250     60200   17.0400  143.6000       7.4        59       197        81
IR     2025250     60200   17.0400  143.5300       7.5        66       188        83
IR     2025250     60200   17.0300  143.2600       4.4        93       159        74
IR     2025250     60200   16.9500  142.6200       8.4       180       142        72
IR     2025250     60200   17.0300  142.5900       8.1       180       131        82
IR     2025250     60200   16.9500  142.4300      12.7       193       136        80
IR     2025250     60200   16.9700  142.4000      11.9       193       143        84
IR     2025250     60200   16.9500  142.2600      10.4       185       164        84
IR     2025250     60200   16.9700  142.1500       6.0       171       180        85
IR     2025250     60200   17.0100  142.0500       4.9       171       188        74
IR     2025250     60200   17.0300  141.9400       6.6       191       191        84
IR     2025250     60200   17.0100  141.8400       9.2       193       192        86
IR     2025250     60200   17.0100  141.7700       9.2       195       195        85
IR     2025250     60200   16.9700  141.6500       8.4       191       204        79
IR     2025250     60200   16.9500  141.2700       4.7       131       286        77
IR     2025250     60200   16.9700  141.2300       5.7       146       292        70
IR     2025250     60200   17.0200  141.0800       8.5       169       297        69
IR     2025250     60200   16.9900  141.0600       9.5       170       295        64
IR     2025250     60200   17.0200  140.9500       9.9       169       293        84
IR     2025250     60200   16.9600  140.8300      11.5       172       298        83
IR     2025250     60200   16.9800  140.7000       9.8       181       325        86
IR     2025250     60200   16.9600  140.6800       9.6       180       326        86
IR     2025250     60200   16.9500  144.9500       6.9        37       381        72
IR     2025250     60200   16.8700  144.8500       9.6        26       333        86
IR     2025250     60200   16.9500  144.8300       7.8        36       333        88
IR     2025250     60200   16.9300  144.7300       9.1        38       333        93
IR     2025250     60200   16.8700  144.3800      12.0        24       281        77
IR     2025250     60200   16.8800  144.1700      12.0        15       268        88
IR     2025250     60200   16.8600  143.8500      15.6        13       210        81
IR     2025250     60200   16.8600  143.7500      17.8        13       197        83
IR     2025250     60200   16.8800  143.7300      18.7        13       197        84
IR     2025250     60200   16.9000  143.6000      10.8        26       189        85
IR     2025250     60200   16.9200  143.5400       9.3        33       184        84
IR     2025250     60200   16.9400  143.4300       5.5        32       171        67
IR     2025250     60200   16.8800  143.3500       7.1        21       167        83
IR     2025250     60200   16.8600  142.8300       5.8       107       210        63
IR     2025250     60200   16.9300  142.6200       9.1       178       146        71
IR     2025250     60200   16.8600  142.5400      12.7       188       134        85
IR     2025250     60200   16.9300  142.4100      12.7       192       141        81
IR     2025250     60200   16.9300  142.3900      12.4       192       143        83
IR     2025250     60200   16.9300  142.2600      10.7       184       164        84
IR     2025250     60200   16.8500  142.1800      10.7       175       175        83
IR     2025250     60200   16.9100  141.9300       4.8       174       192        84
IR     2025250     60200   16.8500  141.9100       5.9       166       192        85
IR     2025250     60200   16.9300  141.8000      10.3       190       194        85
IR     2025250     60200   16.8700  141.6700       9.5       188       201        84
IR     2025250     60200   16.9300  141.6300       8.5       189       205        81
IR     2025250     60200   16.9100  141.1100       8.5       173       293        71
IR     2025250     60200   16.8500  141.0200      10.3       176       291        73
IR     2025250     60200   16.8900  140.9400      10.8       169       283        87
IR     2025250     60200   16.8900  140.8500      11.4       171       291        86
IR     2025250     60200   16.8500  140.7300      11.1       172       319        88
IR     2025250     60200   16.9300  140.6800      10.0       177       327        87
IR     2025250     60200   16.7700  144.9800      10.6        27       412        80
IR     2025250     60200   16.8100  144.9200      10.1        23       338        81
IR     2025250     60200   16.7700  144.8200      10.9        19       328        85
IR     2025250     60200   16.7700  144.7600      10.8        21       332        85
IR     2025250     60200   16.8300  144.5900      12.8        35       333        91
IR     2025250     60200   16.8500  144.5200      13.6        33       306        86
IR     2025250     60200   16.8300  144.4800      13.4        31       299        85
IR     2025250     60200   16.8500  144.3600      12.0        25       281        77
IR     2025250     60200   16.7700  144.2300      11.1        17       280        88
IR     2025250     60200   16.8300  144.1500      13.7        16       267        89
IR     2025250     60200   16.7700  144.0900      13.7        15       260        89
IR     2025250     60200   16.8400  144.0000      11.5        17       239        90
IR     2025250     60200   16.8000  143.8400      14.9        13       210        83
IR     2025250     60200   16.8000  143.7900      16.4        11       198        83
IR     2025250     60200   16.8200  143.6300      15.1        13       189        84
IR     2025250     60200   16.8400  143.6000      12.7        17       187        84
IR     2025250     60200   16.7600  143.5200      12.1        11       179        82
IR     2025250     60200   16.8400  143.3500       7.8        19       168        83
IR     2025250     60200   16.8000  143.3100       7.3        22       166        76
IR     2025250     60200   16.8000  142.7500       6.7       147       158        60
IR     2025250     60200   16.8400  142.6200      10.6       179       142        73
IR     2025250     60200   16.7800  142.5200      11.4       195       132        82
IR     2025250     60200   16.8000  142.4100      11.6       191       143        82
IR     2025250     60200   16.8400  142.3700      12.3       190       149        84
IR     2025250     60200   16.8300  142.2600      12.0       178       163        83
IR     2025250     60200   16.8300  142.1800      11.0       174       175        85
IR     2025250     60200   16.8300  142.0500       5.7       147       187        77
IR     2025250     60200   16.8300  141.9100       6.6       164       192        86
IR     2025250     60200   16.7600  141.8900       9.6       167       193        87
IR     2025250     60200   16.8100  141.7200      10.3       188       198        84
IR     2025250     60200   16.7700  141.7000       9.9       187       199        85
IR     2025250     60200   16.8300  141.6100       8.2       188       207        85
IR     2025250     60200   16.8300  141.4400       4.3       145       232        81
IR     2025250     60200   16.8300  141.3800       4.3       131       253        70
IR     2025250     60200   16.7700  141.0900       9.6       185       293        71
IR     2025250     60200   16.8300  141.0000      10.3       176       287        77
IR     2025250     60200   16.7900  140.9600      10.5       175       281        84
IR     2025250     60200   16.7700  140.7900       9.9       178       298        85
IR     2025250     60200   16.7900  140.7300      10.2       177       323        88
IR     2025250     60200   16.7700  140.6200       8.7       184       339        88
IR     2025250     60200   16.6800  145.4300       5.3        55       329        85
IR     2025250     60200   16.7400  145.1900       8.6        38       422        99
IR     2025250     60200   16.7500  144.9800      10.9        27       412        79
IR     2025250     60200   16.7500  144.7600      11.1        20       330        85
IR     2025250     60200   16.6700  144.6600      10.9        28       318        94
IR     2025250     60200   16.6700  144.5500      12.0        35       305        97
IR     2025250     60200   16.7100  144.4200      12.0        32       281        97
IR     2025250     60200   16.6700  144.3800      11.5        32       278        97
IR     2025250     60200   16.7500  144.2100      11.3        16       279        94
IR     2025250     60200   16.6900  144.1700      11.9        16       279        94
IR     2025250     60200   16.7100  144.0900      13.7        14       267        96
IR     2025250     60200   16.7300  143.9700      11.9        14       229        97
IR     2025250     60200   16.6700  143.8400      12.6        12       205        83
IR     2025250     60200   16.7500  143.8000      15.3         8       199        85
IR     2025250     60200   16.6900  143.6300      16.6         5       188        85
IR     2025250     60200   16.7100  143.5900      15.5         6       185        86
IR     2025250     60200   16.7400  143.4600      10.0        13       177        80
IR     2025250     60200   16.6900  143.3400       7.7        19       176        84
IR     2025250     60200   16.7000  143.2700       6.7        16       166        65
IR     2025250     60200   16.7400  142.7500       6.6       167       148        72
IR     2025250     60200   16.6800  142.5800       8.7       209       132        72
IR     2025250     60200   16.6800  142.4800       7.8       206       136        79
IR     2025250     60200   16.7200  142.4600       9.0       199       136        78
IR     2025250     60200   16.7400  142.3700      10.1       181       149        84
IR     2025250     60200   16.7000  142.2100      11.8       166       172        83
IR     2025250     60200   16.6600  142.1000      11.7       165       184        63
IR     2025250     60200   16.7000  142.0800      10.3       162       185        61
IR     2025250     60200   16.7400  141.9100      10.0       166       193        85
IR     2025250     60200   16.6800  141.8700      12.0       172       195        84
IR     2025250     60200   16.6800  141.7600       9.2       181       199        80
IR     2025250     60200   16.6600  141.6600       7.8       184       203        89
IR     2025250     60200   16.6600  141.5600       6.4       178       212        83
IR     2025250     60200   16.7100  141.4700       5.6       163       225        83
IR     2025250     60200   16.7300  141.3800       5.3       139       245        77
IR     2025250     60200   16.6600  141.0700      10.0       193       300        69
IR     2025250     60200   16.6600  141.0500      10.1       194       299        70
IR     2025250     60200   16.7100  140.9400       9.5       190       279        85
IR     2025250     60200   16.6500  140.8400       9.2       193       288        82
IR     2025250     60200   16.7300  140.7500       8.9       181       331        88
IR     2025250     60200   16.6900  140.6500       8.1       187       352        90
IR     2025250     60200   16.6100  146.2600       9.9        37       898        64
IR     2025250     60200   16.6200  145.5500       5.7        55       407        94
IR     2025250     60200   16.6600  145.4100       5.1        58       323        84
IR     2025250     60200   16.6400  145.3400       5.8        47       319        81
IR     2025250     60200   16.6200  145.2000      10.4        26       381        85
IR     2025250     60200   16.6400  145.1200      12.0        26       458        81
IR     2025250     60200   16.6000  145.0100      14.0        20       426        85
IR     2025250     60200   16.5800  144.9900      14.1        19       425        84
IR     2025250     60200   16.6500  144.6800      10.8        26       316        94
IR     2025250     60200   16.5800  144.5600       9.3        40       295        95
IR     2025250     60200   16.6300  144.3500      10.9        33       279        97
IR     2025250     60200   16.5700  144.2200       9.2        29       293        90
IR     2025250     60200   16.6100  144.1400      11.6        21       287        92
IR     2025250     60200   16.6300  144.0700      13.9        17       273        95
IR     2025250     60200   16.6100  143.9700      12.8        19       234        92
IR     2025250     60200   16.5700  143.8500      11.0        18       216        92
IR     2025250     60200   16.6100  143.7800      11.4        11       196        91
IR     2025250     60200   16.6100  143.6200      14.0         6       188        84
IR     2025250     60200   16.6300  143.5900      13.7         6       187        86
IR     2025250     60200   16.5900  143.2400       7.3       342       164        76
IR     2025250     60200   16.6300  143.1900       5.9       347       162        63
IR     2025250     60200   16.5900  143.1300       6.0       322       160        69
IR     2025250     60200   16.5700  142.6900       6.9       237       144        79
IR     2025250     60200   16.5600  142.5700       6.4       235       139        82
IR     2025250     60200   16.5800  142.4800       5.1       214       145        83
IR     2025250     60200   16.6000  142.4600       5.4       206       145        82
IR     2025250     60200   16.5600  142.3100       8.6       162       155        86
IR     2025250     60200   16.5800  142.2300      10.8       164       175        75
IR     2025250     60200   16.6400  142.1000      12.4       167       184        65
IR     2025250     60200   16.5600  142.0800      15.2       175       185        70
IR     2025250     60200   16.5800  141.9200      16.6       174       194        84
IR     2025250     60200   16.5600  141.8500      14.2       177       201        86
IR     2025250     60200   16.6000  141.7900      11.1       178       202        85
IR     2025250     60200   16.5600  141.6600       8.1       173       205        89
IR     2025250     60200   16.6400  141.5500       6.1       174       217        82
IR     2025250     60200   16.6400  141.4300       5.7       148       230        84
IR     2025250     60200   16.5800  141.3300       6.1       137       255        68
IR     2025250     60200   16.5600  141.3100       6.3       140       261        65
IR     2025250     60200   16.6400  141.1500       9.4       181       299        73
IR     2025250     60200   16.5800  141.0900      10.5       193       304        68
IR     2025250     60200   16.5600  140.9700      11.3       203       291        83
IR     2025250     60200   16.5800  140.9200      11.1       200       286        81
IR     2025250     60200   16.6300  140.8200       9.2       194       291        79
IR     2025250     60200   16.6300  140.7100       8.2       190       340        85
IR     2025250     60200   16.6300  140.6500       8.0       193       351        87
IR     2025250     60200   16.5500  146.2800       8.4        34       896        68
IR     2025250     60200   16.5500  146.2200      10.1        33       896        61
IR     2025250     60200   16.5200  145.4800       4.9        56       321        91
IR     2025250     60200   16.4800  145.3500       5.5        38       324        88
IR     2025250     60200   16.5600  144.9700      14.1        18       423        83
IR     2025250     60200   16.4800  144.8700      11.0        22       406        83
IR     2025250     60200   16.4800  144.7500       8.6        27       326        96
IR     2025250     60200   16.5200  144.7300       9.0        25       309        94
IR     2025250     60200   16.5600  144.5600       8.8        41       295        95
IR     2025250     60200   16.5600  144.5400       9.0        41       294        96
IR     2025250     60200   16.5000  144.4400       9.1        44       290        94
IR     2025250     60200   16.5400  144.2900       9.0        36       288        95
IR     2025250     60200   16.4800  144.2300      10.2        37       306        91
IR     2025250     60200   16.5200  144.1200      11.3        26       298        92
IR     2025250     60200   16.5000  144.0000      12.4        24       277        97
IR     2025250     60200   16.4800  143.9600      12.1        26       261        98
IR     2025250     60200   16.5500  143.8500      10.7        19       217        92
IR     2025250     60200   16.4900  143.7700       8.6        26       209        74
IR     2025250     60200   16.5500  143.6000      11.4         8       189        80
IR     2025250     60200   16.4700  143.5400       8.0        16       190        64
IR     2025250     60200   16.5500  143.4500       9.1       354       187        79
IR     2025250     60200   16.5300  143.3900       8.7       347       187        80
IR     2025250     60200   16.5100  143.2200       9.8       315       165        67
IR     2025250     60200   16.5500  143.1800       7.4       323       163        71
IR     2025250     60200   16.5100  143.0300      10.3       295       163        80
IR     2025250     60200   16.5100  142.9300      10.2       289       162        78
IR     2025250     60200   16.5100  142.8400       9.7       277       161        70
IR     2025250     60200   16.5100  142.8000       9.2       271       158        73
IR     2025250     60200   16.5300  142.7000       7.2       254       149        76
IR     2025250     60200   16.5500  142.5900       6.6       238       142        83
IR     2025250     60200   16.5400  142.5000       4.7       223       148        82
IR     2025250     60200   16.4700  142.4200       4.0       191       154        83
IR     2025250     60200   16.4700  142.3000       6.5       168       159        80
IR     2025250     60200   16.4900  142.1700      10.6       169       182        77
IR     2025250     60200   16.4900  142.1500      11.1       171       183        76
IR     2025250     60200   16.5000  142.0600      16.0       178       187        69
IR     2025250     60200   16.5400  141.9200      16.7       175       196        78
IR     2025250     60200   16.5000  141.8500      14.0       177       204        83
IR     2025250     60200   16.4600  141.7700      11.0       174       209        84
IR     2025250     60200   16.4600  141.6000       7.1       164       216        87
IR     2025250     60200   16.4800  141.5800       6.9       163       218        83
IR     2025250     60200   16.4600  141.1600       9.1       173       305        68
IR     2025250     60200   16.5400  141.0900      10.6       195       305        68
IR     2025250     60200   16.5400  140.9500      11.4       203       291        84
IR     2025250     60200   16.5000  140.9300      11.3       204       297        84
IR     2025250     60200   16.5000  140.7600       8.7       196       310        85
IR     2025250     60200   16.4600  140.7000       8.0       194       327        86
IR     2025250     60200   16.4600  140.6300       7.9       195       337        86
IR     2025250     60200   16.4100  146.2900       6.5        41       895        63
IR     2025250     60200   16.4700  146.1700       8.4        33       892        65
IR     2025250     60200   16.4700  145.5000       5.8        52       313        87
IR     2025250     60200   16.3900  145.3200       6.4        37       329        76
IR     2025250     60200   16.3900  145.3000       6.8        35       335        74
IR     2025250     60200   16.4600  144.9400      11.4        22       425        88
IR     2025250     60200   16.4400  144.8400       9.7        25       402        90
IR     2025250     60200   16.4600  144.7500       8.3        28       342        95
IR     2025250     60200   16.4400  144.7300       7.6        32       321        94
IR     2025250     60200   16.4400  144.6300       7.8        47       288        93
IR     2025250     60200   16.3800  144.5300       7.7        48       288        89
IR     2025250     60200   16.4200  144.4400       8.9        51       291        92
IR     2025250     60200   16.3800  144.3000      10.5        47       295        98
IR     2025250     60200   16.4600  144.2100      10.8        37       309        93
IR     2025250     60200   16.3800  144.1500      12.2        36       313        95
IR     2025250     60200   16.4600  143.9800      12.8        29       277        98
IR     2025250     60200   16.3800  143.9200      12.9        34       268        98
IR     2025250     60200   16.4400  143.8700      11.3        34       227        81
IR     2025250     60200   16.3800  143.6900       9.0        46       216        76
IR     2025250     60200   16.3800  143.6700       8.9        46       212        75
IR     2025250     60200   16.4100  143.5400       7.0        26       194        64
IR     2025250     60200   16.3900  143.4300       7.0       343       194        69
IR     2025250     60200   16.4100  143.3700       8.9       330       190        74
IR     2025250     60200   16.4100  143.2300      12.8       305       175        82
IR     2025250     60200   16.4500  143.1600      12.5       302       165        80
IR     2025250     60200   16.4500  143.0500      13.1       292       164        78
IR     2025250     60200   16.4500  142.9900      12.5       291       164        73
IR     2025250     60200   16.3900  142.9100      13.5       293       164        81
IR     2025250     60200   16.4300  142.8200      11.5       286       162        77
IR     2025250     60200   16.4500  142.7000       7.7       276       156        78
IR     2025250     60200   16.3900  142.5500       4.7       248       156        64
IR     2025250     60200   16.4300  142.5100       4.1       232       154        75
IR     2025250     60200   16.4100  142.3400       4.3       175       159        71
IR     2025250     60200   16.3700  142.2400       6.4       169       180        75
IR     2025250     60200   16.3900  142.1500      10.9       169       184        82
IR     2025250     60200   16.3700  142.0100      15.4       169       193        73
IR     2025250     60200   16.3700  141.9000      14.3       173       208        76
IR     2025250     60200   16.4500  141.8600      14.6       176       206        80
IR     2025250     60200   16.3900  141.7700      11.4       175       213        77
IR     2025250     60200   16.3900  141.6100       7.3       170       219        81
IR     2025250     60200   16.4400  141.5800       6.6       163       222        86
IR     2025250     60200   16.3700  141.4000       6.0       142       247        84
IR     2025250     60200   16.3900  141.3900       6.4       141       248        84
IR     2025250     60200   16.3800  141.1200       9.8       185       313        61
IR     2025250     60200   16.3600  141.1000      10.1       189       315        64
IR     2025250     60200   16.4400  140.9500      11.2       203       305        84
IR     2025250     60200   16.4200  140.8900      10.5       204       303        84
IR     2025250     60200   16.4400  140.8200       9.5       201       304        85
IR     2025250     60200   16.4200  140.6800       7.7       196       328        86
IR     2025250     60200   16.3300  145.4500       5.9        43       308        78
IR     2025250     60200   16.3500  144.9700       7.0        41       433        97
IR     2025250     60200   16.2900  144.9100       5.9        52       418        81
IR     2025250     60200   16.3600  144.7800       7.2        36       391        97
IR     2025250     60200   16.3200  144.3400       9.8        50       286        94
IR     2025250     60200   16.3200  144.3200      10.1        50       287        95
IR     2025250     60200   16.3600  144.2300      11.6        42       300        94
IR     2025250     60200   16.3600  144.1300      12.2        35       314        95
IR     2025250     60200   16.3600  143.9800      13.4        33       297        97
IR     2025250     60200   16.3600  143.9000      13.0        35       264        96
IR     2025250     60200   16.3000  143.8400      13.2        40       253        82
IR     2025250     60200   16.3600  143.6700       9.0        46       216        76
IR     2025250     60200   16.3000  143.6300       9.2        48       222        70
IR     2025250     60200   16.2800  143.5500       7.5        43       219        63
IR     2025250     60200   16.2800  143.3100       7.7       308       200        68
IR     2025250     60200   16.3000  143.2100      11.1       297       191        78
IR     2025250     60200   16.3000  143.1700      12.1       299       179        78
IR     2025250     60200   16.3500  143.0800      15.3       297       166        81
IR     2025250     60200   16.3300  142.9800      14.2       296       166        79
IR     2025250     60200   16.2800  142.8300      12.8       285       164        68
IR     2025250     60200   16.3500  142.7700      11.7       294       162        78
IR     2025250     60200   16.2700  142.6200       5.3       296       161        75
IR     2025250     60200   16.3500  142.5600       4.7       262       158        62
IR     2025250     60200   16.2900  142.2200       6.4       168       184        77
IR     2025250     60200   16.2700  142.0500      11.4       160       194        72
IR     2025250     60200   16.3100  142.0300      13.0       164       194        72
IR     2025250     60200   16.2700  141.8600      11.2       169       218        72
IR     2025250     60200   16.2700  141.7800      10.9       173       220        71
IR     2025250     60200   16.2900  141.6700       8.1       176       221        78
IR     2025250     60200   16.2900  141.6300       6.9       176       229        76
IR     2025250     60200   16.3300  141.5200       5.0       154       237        81
IR     2025250     60200   16.2700  141.3800       6.6       152       254        77
IR     2025250     60200   16.3100  141.3500       6.8       149       262        67
IR     2025250     60200   16.3300  141.1900       8.8       171       305        68
IR     2025250     60200   16.3500  141.1000       9.9       188       314        62
IR     2025250     60200   16.3100  141.0000      10.7       196       306        85
IR     2025250     60200   16.2700  140.9800      10.3       195       300        85
IR     2025250     60200   16.2700  140.8500       8.7       197       303        84
IR     2025250     60200   16.2900  140.7400       7.9       182       323        87
IR     2025250     60200   16.3400  140.6600       7.9       186       329        87
IR     2025250     60200   16.1900  145.1600       7.5        43       364        82
IR     2025250     60200   16.1900  144.9900       7.5        42       400        94
IR     2025250     60200   16.2700  144.8900       6.4        49       413        80
IR     2025250     60200   16.2700  144.8700       6.7        48       410        81
IR     2025250     60200   16.2300  144.7400       7.9        42       396        84
IR     2025250     60200   16.1900  144.6000       8.2        47       330        85
IR     2025250     60200   16.2500  144.5100       8.3        46       291        86
IR     2025250     60200   16.1900  144.4700       7.9        51       299        87
IR     2025250     60200   16.2100  144.3400       8.6        47       291        90
IR     2025250     60200   16.1900  144.3000       8.4        46       290        89
IR     2025250     60200   16.2100  144.2000       9.8        42       285        87
IR     2025250     60200   16.2200  144.0500      12.0        35       307        88
IR     2025250     60200   16.1800  143.9300      12.5        38       314        88
IR     2025250     60200   16.1800  143.9100      12.6        39       314        87
IR     2025250     60200   16.1800  143.3600       6.8       306       221        72
IR     2025250     60200   16.1800  143.2800       8.6       294       211        84
IR     2025250     60200   16.1800  143.1900       9.7       291       201        85
IR     2025250     60200   16.2200  143.0700      12.6       291       179        85
IR     2025250     60200   16.2400  142.9200      12.3       289       174        82
IR     2025250     60200   16.2200  142.8300      11.0       288       171        77
IR     2025250     60200   16.2200  142.8100      10.4       290       170        76
IR     2025250     60200   16.1800  142.0800       7.8       157       195        63
IR     2025250     60200   16.1700  141.9700       9.0       155       212        65
IR     2025250     60200   16.1700  141.7000       8.0       180       230        79
IR     2025250     60200   16.2500  141.6300       6.5       179       233        75
IR     2025250     60200   16.1700  141.5900       5.2       179       243        76
IR     2025250     60200   16.1700  141.4800       5.0       157       251        86
IR     2025250     60200   16.2300  141.3400       7.4       156       272        78
IR     2025250     60200   16.1700  141.3000       8.2       167       286        68
IR     2025250     60200   16.2100  141.1300       9.0       184       310        61
IR     2025250     60200   16.2500  141.1000       9.4       188       313        62
IR     2025250     60200   16.2500  140.9600      10.1       195       297        86
IR     2025250     60200   16.1900  140.8500       9.2       197       306        84
IR     2025250     60200   16.2500  140.8300       8.4       196       303        84
IR     2025250     60200   16.1900  140.7200       8.8       178       321        86
IR     2025250     60200   16.1000  145.5800       6.7        48       327        73
IR     2025250     60200   16.1000  145.5600       6.6        49       310        82
IR     2025250     60200   16.1200  145.3900       8.5        46       302        76
IR     2025250     60200   16.1700  145.1400       7.8        43       370        91
IR     2025250     60200   16.1000  145.0400       8.2        42       375        86
IR     2025250     60200   16.1300  144.9400       8.1        44       389        91
IR     2025250     60200   16.1100  144.8700       9.0        43       402        88
IR     2025250     60200   16.0900  144.7300       8.7        44       410        85
IR     2025250     60200   16.1500  144.6400       7.9        47       368        81
IR     2025250     60200   16.1700  144.5800       7.6        49       328        84
IR     2025250     60200   16.1700  144.2800       8.0        46       290        88
IR     2025250     60200   16.1500  144.2600       7.6        45       290        89
IR     2025250     60200   16.1300  144.1200       7.1        36       287        86
IR     2025250     60200   16.1100  143.9900       9.3        36       313        88
IR     2025250     60200   16.1100  143.9700       9.5        36       315        88
IR     2025250     60200   16.1500  143.8200      11.6        44       311        85
IR     2025250     60200   16.0900  143.7000       9.8        49       300        83
IR     2025250     60200   16.0900  143.6800       9.7        49       293        83
IR     2025250     60200   16.1400  143.5700       7.4        39       250        65
IR     2025250     60200   16.1600  143.3800       6.5       311       228        64
IR     2025250     60200   16.1600  143.3000       8.3       296       216        80
IR     2025250     60200   16.1000  143.1800       9.5       282       204        69
IR     2025250     60200   16.1200  143.0300      12.9       278       188        79
IR     2025250     60200   16.1400  143.0100      12.7       281       183        82
IR     2025250     60200   16.0800  142.9000      11.5       276       180        65
IR     2025250     60200   16.1400  141.8900       7.4       162       222        66
IR     2025250     60200   16.1000  141.7400       7.0       177       231        77
IR     2025250     60200   16.1500  141.6600       7.0       181       237        73
IR     2025250     60200   16.0800  141.6100       5.3       179       251        72
IR     2025250     60200   16.1000  141.4900       5.8       159       254        76
IR     2025250     60200   16.1100  141.4000       7.8       162       269        73
IR     2025250     60200   16.1300  141.1700       9.3       185       306        72
IR     2025250     60200   16.0700  141.0000       9.4       196       303        81
IR     2025250     60200   16.1500  140.9400       9.9       196       303        86
IR     2025250     60200   16.1300  140.8500       9.2       195       309        86
IR     2025250     60200   16.1300  140.7200       9.2       176       320        86
IR     2025250     60200   16.0900  140.6600       8.6       174       326        89
IR     2025250     60200   16.0800  145.5900       6.8        46       340        61
IR     2025250     60200   16.0800  145.5800       6.7        48       321        68
IR     2025250     60200   16.0000  145.4400       6.9        51       291        98
IR     2025250     60200   16.0400  145.3200       8.8        46       308        79
IR     2025250     60200   16.0600  145.2900       9.3        45       319        75
IR     2025250     60200   16.0800  145.1100       9.0        43       369        83
IR     2025250     60200   16.0800  145.0200       8.7        42       375        88
IR     2025250     60200   16.0200  144.7700       9.1        40       420        94
IR     2025250     60200   16.0000  144.7300       8.2        41       426        88
IR     2025250     60200   16.0000  144.5700       5.8        53       402        77
IR     2025250     60200   16.0300  144.4600       6.1        52       333        75
IR     2025250     60200   16.0100  144.1900       4.8        34       300        85
IR     2025250     60200   15.9900  144.1500       4.5        31       298        85
IR     2025250     60200   16.0300  144.0400       6.4        38       300        87
IR     2025250     60200   16.0700  143.9500       8.6        39       317        87
IR     2025250     60200   16.0100  143.8300       8.1        43       334        81
IR     2025250     60200   16.0700  143.7600       9.5        47       324        80
IR     2025250     60200   16.0700  143.6800       9.5        49       301        83
IR     2025250     60200   16.0100  143.5800       7.7        38       297        82
IR     2025250     60200   16.0100  143.5100       6.6        24       273        81
IR     2025250     60200   15.9900  143.4100       5.9       352       256        76
IR     2025250     60200   15.9900  143.2900       6.3       315       233        81
IR     2025250     60200   15.9900  143.2200       7.7       293       211        77
IR     2025250     60200   16.0300  143.1100      10.6       278       199        75
IR     2025250     60200   16.0100  142.9900      11.8       273       192        79
IR     2025250     60200   15.9900  142.8800      10.0       277       184        66
IR     2025250     60200   15.9900  142.7600       7.8       270       181        61
IR     2025250     60200   15.9900  142.7400       7.3       269       180        60
IR     2025250     60200   16.0000  141.8900       4.8       174       226        62
IR     2025250     60200   16.0200  141.7600       5.9       182       235        77
IR     2025250     60200   16.0600  141.7200       6.3       180       240        77
IR     2025250     60200   16.0000  141.6000       5.4       183       258        72
IR     2025250     60200   16.0600  141.5100       6.2       162       259        72
IR     2025250     60200   16.0400  141.3800      10.1       168       282        74
IR     2025250     60200   15.9800  141.2800      10.8       180       297        74
IR     2025250     60200   16.0200  141.2200      10.4       185       298        66
IR     2025250     60200   16.0400  141.0900       9.4       195       297        77
IR     2025250     60200   15.9800  141.0700       9.4       200       288        82
IR     2025250     60200   15.9800  140.9400       8.6       197       311        82
IR     2025250     60200   15.9800  140.8800       8.0       194       322        83
IR     2025250     60200   16.0500  140.7100       7.9       177       323        80
IR     2025250     60200   15.9800  140.6700       6.6       173       334        85
IR     2025250     60200   15.9400  147.3000       4.7        13       918        75
IR     2025250     60200   15.9800  145.5700       5.6        64       309        63
IR     2025250     60200   15.9400  145.5500       5.0        74       299        63
IR     2025250     60200   15.9000  145.3900       5.3        63       284        88
IR     2025250     60200   15.9200  145.2800       7.6        46       293        93
IR     2025250     60200   15.9000  145.2400       7.7        46       294        83
IR     2025250     60200   15.9200  145.1600       8.9        44       316        70
IR     2025250     60200   15.9400  144.7200       6.7        37       461        89
IR     2025250     60200   15.9800  144.5500       5.3        53       405        73
IR     2025250     60200   15.9600  144.5300       4.9        52       403        68
IR     2025250     60200   15.9600  144.3600       5.1        41       327        85
IR     2025250     60200   15.9400  144.3400       5.1        39       327        86
IR     2025250     60200   15.9400  144.2300       4.2        26       305        82
IR     2025250     60200   15.9000  144.0000       4.0        28       298        83
IR     2025250     60200   15.9700  143.9200       7.0        43       317        86
IR     2025250     60200   15.8900  143.7900       4.6        32       334        82
IR     2025250     60200   15.8900  143.7500       4.7        31       334        81
IR     2025250     60200   15.9700  143.5400       5.9        30       301        77
IR     2025250     60200   15.9300  143.4500       4.3        10       279        68
IR     2025250     60200   15.9300  143.3700       4.8       350       256        65
IR     2025250     60200   15.8900  143.2700       5.3       320       233        65
IR     2025250     60200   15.9100  143.2000       7.2       297       211        67
IR     2025250     60200   15.9100  143.1000       8.3       285       203        71
IR     2025250     60200   15.9100  142.9500       8.8       276       196        72
IR     2025250     60200   15.9300  142.9100       9.2       276       193        68
IR     2025250     60200   15.8900  142.8200       7.8       266       192        70
IR     2025250     60200   15.9100  142.7200       7.1       260       188        75
IR     2025250     60200   15.9100  142.5900       4.4       237       186        82
IR     2025250     60200   15.9600  141.8100       5.1       184       231        71
IR     2025250     60200   15.8800  141.7900       4.5       186       256        76
IR     2025250     60200   15.9000  141.7000       4.3       192       259        61
IR     2025250     60200   15.8800  141.5600       5.6       188       269        68
IR     2025250     60200   15.8800  141.4300       9.8       184       287        82
IR     2025250     60200   15.9000  141.3500      10.7       184       298        79
IR     2025250     60200   15.9200  141.2800      10.4       186       299        77
IR     2025250     60200   15.9200  141.1700       9.8       197       300        72
IR     2025250     60200   15.8800  141.0500       8.7       203       281        80
IR     2025250     60200   15.9600  140.9600       8.8       199       307        85
IR     2025250     60200   15.8800  140.9200       7.2       195       308        73
IR     2025250     60200   15.9000  140.8400       6.6       187       342        80
IR     2025250     60200   15.9600  140.6700       6.3       172       337        85
IR     2025250     60200   15.9000  140.6300       5.4       175       342        86
IR     2025250     60200   15.8800  147.4300       5.4        23       922        86
IR     2025250     60200   15.9000  147.3200       5.0        17       915        76
IR     2025250     60200   15.8700  145.5500       4.3        92       277        66
IR     2025250     60200   15.8900  145.3700       5.2        67       284        83
IR     2025250     60200   15.8300  145.2700       5.4        60       290        91
IR     2025250     60200   15.8100  145.0100       8.5        54       342        71
IR     2025250     60200   15.8100  144.9900       8.5        53       350        73
IR     2025250     60200   15.8800  144.7000       5.1        23       478        69
IR     2025250     60200   15.8800  144.4400       4.1        44       366        71
IR     2025250     60200   15.8400  144.3400       4.5        37       338        74
IR     2025250     60200   15.8800  144.2100       4.0        18       306        82
IR     2025250     60200   15.8500  143.2700       4.7       316       248        85
IR     2025250     60200   15.7900  143.1500       7.0       290       223        79
IR     2025250     60200   15.7900  143.0800       6.8       284       214        84
IR     2025250     60200   15.8300  142.9700       6.4       277       202        83
IR     2025250     60200   15.8100  142.5700       4.5       239       194        83
IR     2025250     60200   15.7900  142.2000       4.8       173       213        68
IR     2025250     60200   15.8300  141.9400       4.5       183       229        60
IR     2025250     60200   15.8100  141.7500       4.1       204       271        62
IR     2025250     60200   15.7900  141.6000       4.4       210       270        71
IR     2025250     60200   15.8300  141.5400       5.8       195       272        77
IR     2025250     60200   15.8600  141.3700      10.6       185       297        79
IR     2025250     60200   15.7900  141.2900       9.6       187       303        81
IR     2025250     60200   15.8100  141.2000       9.1       193       301        63
IR     2025250     60200   15.8600  141.0900       8.8       202       286        79
IR     2025250     60200   15.8600  141.0100       8.1       204       279        82
IR     2025250     60200   15.8200  140.9200       6.9       193       309        76
IR     2025250     60200   15.7800  140.8400       6.6       184       349        76
IR     2025250     60200   15.7800  140.7800       6.5       180       365        85
IR     2025250     60200   15.7900  145.8700       4.3        73       270        63
IR     2025250     60200   15.7900  145.4500       4.9       110       270        77
IR     2025250     60200   15.7100  145.1200       6.3        43       316        85
IR     2025250     60200   15.7700  145.0200       8.1        55       324        74
IR     2025250     60200   15.7100  144.9400       7.7        48       334        80
IR     2025250     60200   15.7100  144.8900       7.8        43       352        79
IR     2025250     60200   15.7400  143.3400       5.3       294       287        87
IR     2025250     60200   15.7800  143.2100       7.3       292       255        84
IR     2025250     60200   15.7800  143.1700       7.6       290       248        83
IR     2025250     60200   15.7800  143.1000       7.2       285       221        85
IR     2025250     60200   15.7500  142.9200       6.2       278       213        66
IR     2025250     60200   15.7700  141.6200       4.2       213       271        69
IR     2025250     60200   15.7500  141.6000       4.5       209       273        69
IR     2025250     60200   15.7700  141.2900       9.5       186       304        81
IR     2025250     60200   15.7700  141.0900       8.3       204       286        82
IR     2025250     60200   15.7700  141.0500       7.8       204       282        85
IR     2025250     60200   15.7700  140.9500       6.9       193       302        85
IR     2025250     60200   15.6900  140.7800       5.9       181       358        84
IR     2025250     60200   15.6900  140.7400       5.8       183       364        85
IR     2025250     60200   15.6900  140.5900       5.3       179       373        89
IR     2025250     60200   15.6900  140.5700       5.2       177       372        88
IR     2025250     60200   15.6300  147.7700       6.8        39       917        92
IR     2025250     60200   15.6300  147.1300       4.8        22       905        62
IR     2025250     60200   15.6500  147.0900       5.7        23       908        71
IR     2025250     60200   15.6400  145.4000       4.3        81       310        82
IR     2025250     60200   15.6900  145.1900       4.7        40       329        61
IR     2025250     60200   15.6900  145.1000       6.2        43       318        85
IR     2025250     60200   15.6500  145.0600       6.1        43       323        85
IR     2025250     60200   15.6900  144.9200       7.6        46       340        81
IR     2025250     60200   15.6900  144.8700       7.6        42       352        78
IR     2025250     60200   15.6100  144.7100       6.9        42       363        84
IR     2025250     60200   15.6000  143.2600       8.4       284       272        87
IR     2025250     60200   15.6000  143.2000       9.6       281       270        91
IR     2025250     60200   15.6400  143.0300       8.6       275       250        84
IR     2025250     60200   15.6400  143.0200       8.2       275       249        82
IR     2025250     60200   15.6200  142.7100       7.3       286       229        82
IR     2025250     60200   15.6800  142.5800       4.7       245       214        82
IR     2025250     60200   15.6600  142.5600       4.4       243       215        80
IR     2025250     60200   15.5900  141.5700       6.2       178       290        76
IR     2025250     60200   15.6700  141.4800       7.3       181       286        84
IR     2025250     60200   15.6500  141.4600       7.5       178       289        80
IR     2025250     60200   15.5900  141.3100       7.5       183       308        64
IR     2025250     60200   15.5900  141.1200       6.9       202       296        82
IR     2025250     60200   15.6700  141.0300       6.6       200       290        85
IR     2025250     60200   15.6100  140.9900       5.9       192       313        77
IR     2025250     60200   15.6700  140.8600       5.8       182       343        81
IR     2025250     60200   15.6700  140.7800       5.8       182       356        84
IR     2025250     60200   15.5900  140.6800       5.9       184       355        87
IR     2025250     60200   15.6300  140.5700       5.4       177       376        89
IR     2025250     60200   15.5800  147.9400       9.1        43       952        89
IR     2025250     60200   15.5400  147.8600       7.0        45       940        93
IR     2025250     60200   15.5600  147.7600       5.9        44       908        76
IR     2025250     60200   15.6100  147.1500       4.3        23       900        61
IR     2025250     60200   15.5200  145.4500       4.9        50       285        85
IR     2025250     60200   15.6000  145.2100       4.2        41       367        61
IR     2025250     60200   15.5700  144.9200       6.4        53       337        84
IR     2025250     60200   15.5700  144.9000       6.7        53       339        83
IR     2025250     60200   15.5100  144.6100       6.1        44       350        75
IR     2025250     60200   15.5100  143.2800       7.4       287       266        82
IR     2025250     60200   15.5800  143.2200       9.1       283       271        87
IR     2025250     60200   15.5600  143.1100       9.0       277       262        74
IR     2025250     60200   15.5100  142.9700       7.5       279       251        78
IR     2025250     60200   15.5000  142.7100       8.2       289       240        75
IR     2025250     60200   15.5000  142.6900       8.0       287       239        74
IR     2025250     60200   15.5400  142.5200       4.3       250       222        62
IR     2025250     60200   15.5200  141.6700       6.0       166       289        77
IR     2025250     60200   15.5400  141.6500       6.3       169       290        75
IR     2025250     60200   15.5000  141.4800       7.5       177       299        71
IR     2025250     60200   15.5400  141.3800       6.9       185       299        69
IR     2025250     60200   15.5000  141.2900       6.3       196       301        68
IR     2025250     60200   15.5200  141.2100       6.3       199       303        71
IR     2025250     60200   15.5700  141.1000       6.7       204       294        85
IR     2025250     60200   15.5500  141.0800       6.5       205       298        85
IR     2025250     60200   15.5700  140.9900       6.0       191       326        80
IR     2025250     60200   15.5200  140.8200       5.3       186       350        81
IR     2025250     60200   15.5300  140.7200       5.5       185       356        87
IR     2025250     60200   15.5200  140.7000       5.4       183       356        87
IR     2025250     60200   15.4800  147.7800       6.3        44       904        87
IR     2025250     60200   15.4800  147.7400       5.8        43       899        82
IR     2025250     60200   15.5200  147.6400       4.8        47       885        74
IR     2025250     60200   15.5200  147.4900       4.4        43       872        61
IR     2025250     60200   15.5200  147.4500       4.7        46       873        64
IR     2025250     60200   15.4200  144.9700       4.7        59       332        73
IR     2025250     60200   15.4200  144.8700       5.2        63       323        81
IR     2025250     60200   15.4800  144.8000       5.9        59       339        82
IR     2025250     60200   15.4800  144.4900       5.0        44       343        73
IR     2025250     60200   15.4700  144.4700       4.9        45       343        72
IR     2025250     60200   15.4400  144.3800       4.0        36       343        83
IR     2025250     60200   15.4100  143.1400       6.4       283       264        74
IR     2025250     60200   15.4100  143.0500       5.9       283       262        68
IR     2025250     60200   15.4300  142.9300       6.5       286       255        63
IR     2025250     60200   15.4700  142.7400       8.1       291       243        67
IR     2025250     60200   15.4500  142.5700       5.3       277       236        60
IR     2025250     60200   15.4200  141.7000       4.1       162       286        66
IR     2025250     60200   15.4000  141.5900       7.0       165       296        67
IR     2025250     60200   15.4600  141.4800       7.4       178       300        75
IR     2025250     60200   15.4400  141.3400       6.5       197       297        84
IR     2025250     60200   15.4000  141.2500       5.3       201       302        76
IR     2025250     60200   15.4800  141.1500       5.7       206       304        84
IR     2025250     60200   15.4400  141.1000       5.4       208       318        69
IR     2025250     60200   15.4000  141.0400       5.1       203       336        70
IR     2025250     60200   15.4800  140.8900       4.6       194       423        80
IR     2025250     60200   15.4800  140.8000       4.8       188       356        85
IR     2025250     60200   15.4400  140.7000       4.7       182       368        82
IR     2025250     60200   15.4000  140.5900       4.7       175       401        85
IR     2025250     60200   15.4000  140.5700       4.6       177       406        83
IR     2025250     60200   15.3700  147.7900       5.4        38       894        67
IR     2025250     60200   15.3500  147.7300       5.3        36       878        82
IR     2025250     60200   15.3400  147.6300       4.7        35       874        80
IR     2025250     60200   15.3500  145.3500       4.2        74       240        70
IR     2025250     60200   15.3300  145.1600       4.9        68       285        78
IR     2025250     60200   15.3400  144.9800       4.7        69       290        65
IR     2025250     60200   15.3200  144.9500       4.6        73       279        67
IR     2025250     60200   15.4000  144.8700       5.2        65       315        80
IR     2025250     60200   15.3400  144.5500       4.6        43       340        88
IR     2025250     60200   15.3400  144.4500       5.0        48       337        86
IR     2025250     60200   15.3800  144.4100       4.5        42       340        87
IR     2025250     60200   15.3200  144.3200       4.8        46       338        88
IR     2025250     60200   15.3800  144.2200       4.0        39       339        83
IR     2025250     60200   15.3200  143.5200       5.8       290       306        88
IR     2025250     60200   15.3500  143.4000       6.2       281       281        87
IR     2025250     60200   15.3500  143.3900       6.3       281       279        85
IR     2025250     60200   15.3700  143.0400       5.6       288       268        80
IR     2025250     60200   15.3300  142.9700       5.7       295       277        82
IR     2025250     60200   15.3100  142.9100       6.1       298       279        83
IR     2025250     60200   15.3100  142.6600       5.5       286       249        80
IR     2025250     60200   15.3100  141.6200       5.5       158       283        64
IR     2025250     60200   15.3600  141.5700       6.8       166       291        66
IR     2025250     60200   15.3800  141.2300       5.0       202       309        66
IR     2025250     60200   15.3800  141.1500       4.9       205       314        66
IR     2025250     60200   15.3200  141.0400       4.6       200       338        74
IR     2025250     60200   15.3000  141.0200       4.6       200       341        74
IR     2025250     60200   15.3600  140.7600       4.8       179       405        78
IR     2025250     60200   15.3800  140.7200       4.7       178       398        77
IR     2025250     60200   15.3400  140.5700       4.2       174       412        86
IR     2025250     60200   15.2900  147.7500       6.0        37       878        71
IR     2025250     60200   15.2700  147.7300       6.1        38       877        76
IR     2025250     60200   15.2700  147.5500       4.8        42       784        70
IR     2025250     60200   15.2700  147.5300       4.4        43       783        69
IR     2025250     60200   15.2300  145.4600       4.1        73       212        66
IR     2025250     60200   15.2900  145.3300       4.3        78       225        80
IR     2025250     60200   15.2700  145.1100       4.4        64       267        64
IR     2025250     60200   15.3100  144.9600       4.4        74       273        69
IR     2025250     60200   15.3000  144.9300       4.4        75       263        68
IR     2025250     60200   15.2500  144.6200       4.2        49       332        83
IR     2025250     60200   15.2300  144.5400       4.8        34       337        83
IR     2025250     60200   15.3000  144.4500       5.3        47       337        85
IR     2025250     60200   15.3000  144.3100       4.7        44       341        88
IR     2025250     60200   15.2800  144.2800       4.5        42       342        87
IR     2025250     60200   15.2400  143.6300       4.3       315       319        85
IR     2025250     60200   15.2200  143.6100       4.7       317       320        84
IR     2025250     60200   15.2200  143.5100       6.0       303       321        88
IR     2025250     60200   15.3000  143.4200       7.0       282       305        87
IR     2025250     60200   15.2900  143.1000       5.8       292       289        79
IR     2025250     60200   15.2600  142.9800       5.8       297       304        83
IR     2025250     60200   15.2600  142.9500       5.5       298       301        82
IR     2025250     60200   15.2900  142.7000       5.3       290       254        73
IR     2025250     60200   15.2100  141.8700       4.0       182       284        75
IR     2025250     60200   15.2300  141.6800       4.9       166       278        77
IR     2025250     60200   15.2900  141.6000       5.9       159       283        74
IR     2025250     60200   15.2900  141.4300       6.3       186       299        85
IR     2025250     60200   15.2900  141.2400       5.1       204       336        68
IR     2025250     60200   15.2100  141.0900       4.8       195       346        87
IR     2025250     60200   15.2900  141.0000       4.4       200       343        77
IR     2025250     60200   15.2700  140.9600       4.4       199       402        77
IR     2025250     60200   15.1500  147.6800       6.4        45       829        83
IR     2025250     60200   15.1500  147.6200       6.0        45       792        77
IR     2025250     60200   15.2300  147.4900       4.4        50       776        69
IR     2025250     60200   15.2100  145.4600       4.2        72       212        67
IR     2025250     60200   15.2100  145.4000       4.4        81       212        83
IR     2025250     60200   15.1300  144.5900       4.5        41       326        81
IR     2025250     60200   15.1300  144.5400       5.7        33       337        84
IR     2025250     60200   15.1300  144.4800       6.3        35       343        84
IR     2025250     60200   15.1300  144.3300       5.4        39       341        84
IR     2025250     60200   15.1300  144.2900       5.2        42       339        84
IR     2025250     60200   15.1200  143.6000       4.0       340       320        82
IR     2025250     60200   15.2000  143.5300       5.8       308       321        86
IR     2025250     60200   15.1200  143.4000       6.1       301       325        90
IR     2025250     60200   15.1800  142.9400       5.2       286       318        74
IR     2025250     60200   15.1200  142.9000       5.1       275       313        74
IR     2025250     60200   15.1200  142.6200       4.4       265       260        70
IR     2025250     60200   15.1200  141.9800       5.1       163       274        77
IR     2025250     60200   15.1400  141.8600       4.9       178       284        84
IR     2025250     60200   15.1700  141.7900       4.6       180       283        80
IR     2025250     60200   15.1900  141.4900       5.5       177       310        79
IR     2025250     60200   15.1700  141.2800       4.9       195       355        69
IR     2025250     60200   15.1900  141.2600       4.9       197       351        68
IR     2025250     60200   15.0800  147.7500       6.4        46       934        65
IR     2025250     60200   15.1300  147.6600       6.2        45       794        75
IR     2025250     60200   15.0900  147.5400       4.2        42       777        70
IR     2025250     60200   15.0400  145.3500       4.6        75       212        72
IR     2025250     60200   15.0400  145.3300       4.6        76       212        69
IR     2025250     60200   15.1100  144.5200       6.2        34       338        84
IR     2025250     60200   15.1100  144.5000       6.3        35       340        84
IR     2025250     60200   15.0900  144.3300       5.2        37       341        85
IR     2025250     60200   15.0700  144.2900       4.6        35       339        85
IR     2025250     60200   15.0200  142.0700       4.6       170       261        87
IR     2025250     60200   15.0400  142.0500       4.9       171       266        87
IR     2025250     60200   15.0800  141.7100       5.0       182       296        79
IR     2025250     60200   15.0600  141.6900       4.8       183       313        76
IR     2025250     60200   15.0600  141.4700       4.0       185       352        61
IR     2025250     60200   15.1000  141.4100       4.4       190       355        64
IR     2025250     60200   15.0800  141.3100       4.7       189       363        65
IR     2025250     60200   15.0000  145.4300       4.9        55       212        65
IR     2025250     60200   15.0000  145.3900       4.9        62       212        82
IR     2025250     60200   15.0000  145.3100       4.4        74       212        62
IR     2025250     60200   14.9600  144.5700       5.1        36       347        76
IR     2025250     60200   15.0000  142.1100       4.4       170       255        86
IR     2025250     60200   15.0000  141.9900       4.6       174       267        87
IR     2025250     60200   15.0000  141.9000       4.8       167       284        87
IR     2025250     60200   15.0000  141.8000       4.8       174       305        84
IR     2025250     60200   14.9000  144.6600       4.1        51       346        70
IR     2025250     60200   14.9000  144.4900       4.5        35       362        72
IR     2025250     60200   14.8900  141.8600       4.2       162       336        72
IR     2025250     60200   14.8600  141.2000       4.1       186       379        71
IR     2025250     60200   14.7700  147.6200       5.9        41       809        85
IR     2025250     60200   14.8200  144.3100       4.2       322       380        89
IR     2025250     60200   14.8200  144.1800       4.8       320       354        79
IR     2025250     60200   14.7500  147.7300       5.0        28       796        87
IR     2025250     60200   14.5600  145.2200       4.7        93       202        88
IR     2025250     60200   14.5600  147.7200       4.2        40       782        65
IR     2025250     60200   14.5400  145.2300       4.2        89       203        88
IR     2025250     60200   14.4700  142.8400       4.1       262       224        67
IR     2025250     60200   14.2900  141.4800       4.3       200       432        70
IR     2025250     60200   14.2400  141.5200       4.0       196       410        89
IR     2025250     60200   14.0100  142.0000       4.6       170       421        77
IR     2025250     60200   13.8800  142.3400       4.2       206       826        80
IR     2025250     60200   13.9500  142.2100       4.0       210       837        62
IR     2025250     60200   13.8600  142.3600       4.0       202       824        85
IR     2025250     60200   13.8200  142.2600       4.3       208       796        62
IR     2025250     60200   13.7400  144.7600       4.6        55       375        71
IR     2025250     60200   13.5400  142.7600       4.0       219       887        88
IR     2025250     60200   13.5000  142.5100       4.1       122       276        73
IR     2025250     60200   13.4100  144.2600       4.7        54       230        83
IR     2025250     60200   13.4600  140.8100       4.2        44       229        84
IR     2025250     60200   13.4600  140.7000       4.4        46       237        80
IR     2025250     60200   13.3100  141.3900       4.7        94       253        70
IR     2025250     60200   13.3400  141.3700       4.6        88       257        65
IR     2025250     60200   13.2100  141.5000       5.1       114       260        71
IR     2025250     60200   13.2100  141.4800       5.2       113       258        70
IR     2025250     60200   13.2900  141.3900       4.8        94       252        65
IR     2025250     60200   13.2300  140.8600       4.8        43       232        86
IR     2025250     60200   13.1500  141.5500       5.8       117       260        73
IR     2025250     60200   13.1900  141.5000       5.3       113       258        70
IR     2025250     60200   13.1200  141.3500       4.7        95       239        87
IR     2025250     60200   13.1200  141.3300       4.5        92       236        87
IR     2025250     60200   13.1500  140.9400       4.1        49       236        86
IR     2025250     60200   13.1700  140.8200       4.3        47       247        84
IR     2025250     60200   13.0200  141.8300       4.0        79       333        77
IR     2025250     60200   13.0200  141.6800       5.3       112       258        86
IR     2025250     60200   13.0200  141.6200       6.0       119       250        84
IR     2025250     60200   13.0600  141.5300       5.7       117       248        81
IR     2025250     60200   13.0800  141.4000       5.0       100       240        87
IR     2025250     60200   13.1000  141.3300       4.4        92       235        83
IR     2025250     60200   13.0600  141.2900       4.2        86       234        79
IR     2025250     60200   12.9300  141.9000       4.0        98       290        81
IR     2025250     60200   12.9700  141.8500       4.2        94       281        83
IR     2025250     60200   12.9500  141.7900       5.1       104       258        84
IR     2025250     60200   13.0000  141.6400       5.6       117       251        89
IR     2025250     60200   13.0000  141.5700       5.4       118       244        72
IR     2025250     60200   12.8400  142.2400       4.2        54       364        65
IR     2025250     60200   12.8400  142.2200       4.2        54       365        65
IR     2025250     60200   12.8700  141.9900       4.0        96       319        67
IR     2025250     60200   12.8300  141.8600       5.6       110       253        87
IR     2025250     60200   12.8300  141.8200       5.9       111       247        87
IR     2025250     60200   12.9100  141.7300       5.9       113       253        94
IR     2025250     60200   12.8300  141.5800       4.5       102       227        79
IR     2025250     60200   12.8500  141.5600       4.2       104       227        76
IR     2025250     60200   12.7400  142.4000       4.0        63       330        69
IR     2025250     60200   12.7400  142.2500       4.6        53       308        71
IR     2025250     60200   12.8000  142.2200       4.3        54       344        64
IR     2025250     60200   12.7800  142.1400       4.1        70       321        75
IR     2025250     60200   12.7800  142.0500       4.1        93       280        72
IR     2025250     60200   12.7800  141.9200       6.2       113       252        72
IR     2025250     60200   12.8200  141.8200       6.2       111       245        87
IR     2025250     60200   12.7600  141.7500       6.9       107       233        84
IR     2025250     60200   12.8200  141.6000       4.7        99       228        83
IR     2025250     60200   12.7000  142.3600       4.3        62       314        69
IR     2025250     60200   12.6500  142.1400       4.8        70       249        88
IR     2025250     60200   12.7200  141.8200       7.1        99       234        93
IR     2025250     60200   12.6600  141.7300       6.5        84       227        88
IR     2025250     60200   12.7200  141.6200       4.8        87       228        84
IR     2025250     60200   12.7200  141.5800       4.2        90       229        71
IR     2025250     60200   12.5900  142.0400       5.8        79       231        92
IR     2025250     60200   12.5900  141.9900       6.8        78       227        95
IR     2025250     60200   12.5700  141.6300       4.3        72       246        84
SWIR   2025250     60200   21.4100  148.5000       5.5        72       944        60
SWIR   2025250     60200   21.4000  145.9900       4.6        95       918        69
SWIR   2025250     60200   21.3800  145.3900       6.7        79       920        94
SWIR   2025250     60200   21.4400  145.3500       7.7        75       922        79
SWIR   2025250     60200   21.3700  144.7100       8.4       113       936        70
SWIR   2025250     60200   21.4500  144.6100       8.2        81       959        61
SWIR   2025250     60200   21.3700  144.5100       7.8        95       938        60
SWIR   2025250     60200   21.3900  148.5200       5.4        71       958        61
SWIR   2025250     60200   21.3600  146.0000       4.5        91       923        67
SWIR   2025250     60200   21.3000  145.4600       6.0        92       915        93
SWIR   2025250     60200   21.3600  145.3800       6.4        81       918        92
SWIR   2025250     60200   21.3400  145.2000       7.4       109       909        68
SWIR   2025250     60200   21.3100  144.7400       8.5       114       918        69
SWIR   2025250     60200   21.2900  144.6800       8.4       110       921        63
SWIR   2025250     60200   21.3000  148.7700       5.8        62       982        63
SWIR   2025250     60200   21.1800  145.7900       6.4        75       903        70
SWIR   2025250     60200   21.2400  145.6300       8.1        91       909        63
SWIR   2025250     60200   21.2400  145.6000       7.8        89       911        83
SWIR   2025250     60200   21.2400  145.5000       5.7        89       920        75
SWIR   2025250     60200   21.2600  145.4200       5.3        93       913        64
SWIR   2025250     60200   21.2500  144.4600       6.6       114       874        65
SWIR   2025250     60200   21.1700  144.3400       7.8        97       835        60
SWIR   2025250     60200   21.1700  144.3200       7.8        95       835        62
SWIR   2025250     60200   21.0800  145.8400       6.7        65       907        78
SWIR   2025250     60200   21.0800  145.7800       7.6        69       909        77
SWIR   2025250     60200   21.0800  145.6400       7.9        63       926        95
SWIR   2025250     60200   21.1000  145.5900       7.5        67       922        89
SWIR   2025250     60200   21.1300  145.2700       7.0       125       914        60
SWIR   2025250     60200   21.1500  145.2100       7.7       123       912        76
SWIR   2025250     60200   21.0900  144.8100       9.0       129       912        75
SWIR   2025250     60200   21.0600  143.8000       9.2       117       868        74
SWIR   2025250     60200   21.0600  143.7600       9.8       129       868        71
SWIR   2025250     60200   21.0800  143.1100       8.1       106       869        72
SWIR   2025250     60200   21.1200  143.0300       7.5       103       878        60
SWIR   2025250     60200   21.1100  142.1600      10.1       108       888        73
SWIR   2025250     60200   21.0700  141.5900      10.4        95       877        65
SWIR   2025250     60200   21.0600  145.8200       7.2        70       908        80
SWIR   2025250     60200   21.0600  145.7600       7.8        69       911        80
SWIR   2025250     60200   21.0600  145.6200       7.9        62       927        82
SWIR   2025250     60200   20.9700  145.4600       6.3        73       917        65
SWIR   2025250     60200   21.0500  145.2400       5.5        91       920        85
SWIR   2025250     60200   20.9900  145.2000       7.3        70       919        66
SWIR   2025250     60200   20.9700  145.0400       7.1        80       913        64
SWIR   2025250     60200   21.0500  144.8500       8.0       120       912        67
SWIR   2025250     60200   20.9800  143.7900       8.4       116       876        71
SWIR   2025250     60200   20.9600  143.6700       7.9       118       862        91
SWIR   2025250     60200   21.0200  143.4600       6.5       103       859        68
SWIR   2025250     60200   20.9800  143.3400       8.5       120       881        69
SWIR   2025250     60200   21.0200  143.2400       9.3       110       885        95
SWIR   2025250     60200   21.0400  143.2000       8.9       105       871        91
SWIR   2025250     60200   20.9900  142.3800       9.1        98       904        82
SWIR   2025250     60200   21.0300  142.2800       9.6        96       899        65
SWIR   2025250     60200   20.9000  146.2500       5.9        77       952        66
SWIR   2025250     60200   20.8800  146.1700       5.3        75       921        78
SWIR   2025250     60200   20.9600  146.0900       4.0        61       913        72
SWIR   2025250     60200   20.9600  145.8100       6.3        75       905        74
SWIR   2025250     60200   20.9600  145.7500       6.7        63       911        64
SWIR   2025250     60200   20.9200  145.6100       6.9        59       922        82
SWIR   2025250     60200   20.9300  145.5700       7.6        61       922        82
SWIR   2025250     60200   20.8700  145.4500       6.5        67       922        96
SWIR   2025250     60200   20.8900  145.0400       7.7        84       915        60
SWIR   2025250     60200   20.9100  145.0000       8.3        77       913        66
SWIR   2025250     60200   20.8700  144.9000       8.8        70       916        65
SWIR   2025250     60200   20.9300  144.7200       7.6       120       909        69
SWIR   2025250     60200   20.9400  143.6900       8.1       114       863        96
SWIR   2025250     60200   20.9200  143.6100       6.3       108       853        67
SWIR   2025250     60200   20.8800  143.3700       7.5       117       872        61
SWIR   2025250     60200   20.8800  143.3200       8.8       117       872        83
SWIR   2025250     60200   20.8500  142.7000       9.4       104       875        70
SWIR   2025250     60200   20.8900  142.4300       8.2       106       895        93
SWIR   2025250     60200   20.8700  142.3700       8.0       108       886        67
SWIR   2025250     60200   20.9100  141.6300      10.6        93       875        63
SWIR   2025250     60200   20.9200  141.1200      10.0        92       944        64
SWIR   2025250     60200   20.7800  146.3200       8.6        90       950        75
SWIR   2025250     60200   20.8200  146.2000       5.6        84       915        66
SWIR   2025250     60200   20.8200  146.0800       5.0        72       908        89
SWIR   2025250     60200   20.7700  144.8900       7.1        87       918        68
SWIR   2025250     60200   20.8300  144.7900       7.1        94       914        64
SWIR   2025250     60200   20.7600  144.0800       9.1       107       868        66
SWIR   2025250     60200   20.7600  143.9000      13.1       117       770        84
SWIR   2025250     60200   20.7800  143.8600      12.2       118       779        85
SWIR   2025250     60200   20.8000  143.7800      10.9       116       790        81
SWIR   2025250     60200   20.7800  143.6600      10.2       119       793        72
SWIR   2025250     60200   20.7800  143.5900       9.5       121       846        79
SWIR   2025250     60200   20.7700  143.3100      10.1       113       875        95
SWIR   2025250     60200   20.7900  143.2900      10.5       111       875        91
SWIR   2025250     60200   20.8100  143.1900       8.5       109       864        68
SWIR   2025250     60200   20.7900  142.9600       8.7        91       870        60
SWIR   2025250     60200   20.7700  142.6800       9.4       111       890        95
SWIR   2025250     60200   20.7900  142.6600       9.1       109       890        93
SWIR   2025250     60200   20.7400  146.3200       9.0        79       950        77
SWIR   2025250     60200   20.6800  146.2300       8.2        60       927        86
SWIR   2025250     60200   20.6800  146.1300       6.2        64       916        88
SWIR   2025250     60200   20.6800  146.0700       4.9        73       917        74
SWIR   2025250     60200   20.6700  145.5200       7.3       104       928        66
SWIR   2025250     60200   20.6900  145.5000       7.1       104       928        60
SWIR   2025250     60200   20.7300  145.0600       9.2        76       947        95
SWIR   2025250     60200   20.6600  144.5100      12.7       117       867        75
SWIR   2025250     60200   20.6600  144.3300      11.1       114       843        79
SWIR   2025250     60200   20.6600  144.2300       8.5       115       798        88
SWIR   2025250     60200   20.6800  144.1700       8.0       114       802        84
SWIR   2025250     60200   20.7000  144.0400      11.3       116       772        77
SWIR   2025250     60200   20.7400  143.9400      13.2       114       767        65
SWIR   2025250     60200   20.7400  143.9200      13.1       115       758        67
SWIR   2025250     60200   20.6800  143.8000      12.5       122       744        86
SWIR   2025250     60200   20.6800  143.7200      12.8       128       763        77
SWIR   2025250     60200   20.7200  143.6200      10.8       128       815        81
SWIR   2025250     60200   20.6700  143.3800      11.6       129       876        81
SWIR   2025250     60200   20.7300  143.3300      10.4       121       873        91
SWIR   2025250     60200   20.7100  142.8700       9.3       109       865        83
SWIR   2025250     60200   20.6700  142.8300       9.2       108       861        67
SWIR   2025250     60200   20.7300  142.7200       9.5       113       890        91
SWIR   2025250     60200   20.6900  142.6600      10.9       117       890        88
SWIR   2025250     60200   20.6500  142.4000      12.5       123       844        77
SWIR   2025250     60200   20.6700  142.3200       9.9       128       846        83
SWIR   2025250     60200   20.6500  141.9500       9.5       118       899        60
SWIR   2025250     60200   20.6700  141.9100       9.7       109       903        64
SWIR   2025250     60200   20.5800  146.3800       9.3        56       959        90
SWIR   2025250     60200   20.6600  146.2300       8.5        58       932        92
SWIR   2025250     60200   20.6600  146.1300       6.5        62       920        83
SWIR   2025250     60200   20.5800  146.0700       6.7        72       945        93
SWIR   2025250     60200   20.5700  145.8100       5.8        83       948        83
SWIR   2025250     60200   20.5700  145.7500       6.0        71       950        84
SWIR   2025250     60200   20.5900  145.6700       7.2        62       953        81
SWIR   2025250     60200   20.6300  144.8000       6.9       128       862        68
SWIR   2025250     60200   20.5600  144.5200      14.4       132       855        66
SWIR   2025250     60200   20.5600  144.5000      15.0       130       834        62
SWIR   2025250     60200   20.6400  144.3500      12.8       115       834        80
SWIR   2025250     60200   20.6400  144.2700      10.5       117       787        85
SWIR   2025250     60200   20.5600  144.2100      12.4       131       737        82
SWIR   2025250     60200   20.6000  144.1100       9.5       124       765        84
SWIR   2025250     60200   20.6000  143.9300      11.2       108       742        86
SWIR   2025250     60200   20.5600  143.8900      10.9       113       759        83
SWIR   2025250     60200   20.6100  143.4800      11.2       131       875        73
SWIR   2025250     60200   20.6300  143.4200      11.8       129       878        80
SWIR   2025250     60200   20.5900  143.3400      14.6       131       826        68
SWIR   2025250     60200   20.6300  143.2400      12.3       124       794        78
SWIR   2025250     60200   20.6300  142.8300       9.6       114       837        77
SWIR   2025250     60200   20.6300  142.8100       9.6       111       841        69
SWIR   2025250     60200   20.6300  142.7100      11.4       112       877        85
SWIR   2025250     60200   20.5700  142.5500      13.6       116       829        91
SWIR   2025250     60200   20.5900  142.0300       8.4       120       886        63
SWIR   2025250     60200   20.5900  141.9500       9.6       119       893        85
SWIR   2025250     60200   20.6300  141.9100       9.2       111       900        83
SWIR   2025250     60200   20.5600  146.4200       9.5        53       963        72
SWIR   2025250     60200   20.5600  146.1400       8.3        58       946        97
SWIR   2025250     60200   20.5100  145.9200       6.3        99       949        76
SWIR   2025250     60200   20.4700  145.7600       6.0        84       955        64
SWIR   2025250     60200   20.5100  145.5300       5.3       100       905        79
SWIR   2025250     60200   20.5300  145.5100       5.2        91       918        82
SWIR   2025250     60200   20.5400  144.5200      14.2       131       840        70
SWIR   2025250     60200   20.5200  144.4000      15.3       118       736        82
SWIR   2025250     60200   20.4600  144.3000      12.0       116       733        78
SWIR   2025250     60200   20.4600  144.2000      10.4       128       754        67
SWIR   2025250     60200   20.4800  144.1800      10.7       132       755        68
SWIR   2025250     60200   20.5200  144.0800       8.7       124       783        89
SWIR   2025250     60200   20.5200  143.6100      10.6       124       858        77
SWIR   2025250     60200   20.5300  143.4800      13.0       141       874        74
SWIR   2025250     60200   20.5100  143.4200      14.1       135       868        73
SWIR   2025250     60200   20.5100  143.3200      15.6       123       776        69
SWIR   2025250     60200   20.4500  143.1400      10.6       111       763        82
SWIR   2025250     60200   20.4500  143.0000       8.6       117       779        60
SWIR   2025250     60200   20.5100  142.6100      13.5       113       822        91
SWIR   2025250     60200   20.5100  142.5900      13.8       113       817        90
SWIR   2025250     60200   20.4500  142.3100      11.6       120       790        75
SWIR   2025250     60200   20.4500  142.2700      10.7       118       789        84
SWIR   2025250     60200   20.5100  142.2000       7.1       123       794        85
SWIR   2025250     60200   20.5300  142.0200      10.0       123       855        75
SWIR   2025250     60200   20.5300  142.0000      10.6       122       856        79
SWIR   2025250     60200   20.4600  146.1000       8.0        64       960        79
SWIR   2025250     60200   20.3900  145.8500       6.1       113       948        60
SWIR   2025250     60200   20.4100  145.6600       5.8        98       920        67
SWIR   2025250     60200   20.4300  145.4800       5.5        92       905        68
SWIR   2025250     60200   20.4400  144.4900      11.3       121       746        85
SWIR   2025250     60200   20.4400  144.1600       7.8       127       781        64
SWIR   2025250     60200   20.3700  143.2300      16.8       102       760        66
SWIR   2025250     60200   20.3900  143.0000      11.7       111       802        66
SWIR   2025250     60200   20.4300  142.3100      11.8       122       793        71
SWIR   2025250     60200   20.4300  142.2900      11.5       121       792        77
SWIR   2025250     60200   20.3400  146.1500       8.3        58       968        81
SWIR   2025250     60200   20.2700  146.0200       5.8        86       958        69
SWIR   2025250     60200   20.2700  146.0000       5.8        88       956        68
SWIR   2025250     60200   20.2900  145.7500       6.3       106       951        69
SWIR   2025250     60200   20.2600  144.4400      10.6       116       756        75
SWIR   2025250     60200   20.2900  143.6200      10.5       118       845        60
SWIR   2025250     60200   20.3300  142.2900      11.4       125       817        88
SWIR   2025250     60200   20.2900  142.1900       8.3       124       808        70
SWIR   2025250     60200   20.1700  145.9400       5.5        75       952        81
SWIR   2025250     60200   20.2300  145.8800       5.9        99       949        78
SWIR   2025250     60200   20.2100  145.7600       6.0       100       946        83
SWIR   2025250     60200   20.2300  145.6900       6.0       103       929        64
SWIR   2025250     60200   20.1700  145.4200       6.7        88       877        70
SWIR   2025250     60200   20.1700  145.3500       7.5        72       901        63
SWIR   2025250     60200   20.2400  144.5400      10.6       115       740        65
SWIR   2025250     60200   20.1600  144.4400      10.8       116       787        88
SWIR   2025250     60200   20.1500  143.1600      13.7       108       839        81
SWIR   2025250     60200   20.1500  143.0300      12.9       115       862        80
SWIR   2025250     60200   20.1900  142.3600      10.7       115       873        60
SWIR   2025250     60200   20.2300  142.2100       8.3       122       831        60
SWIR   2025250     60200   20.1000  148.3600       5.9        52       979        70
SWIR   2025250     60200   20.1600  146.3700       6.5        63       967        73
SWIR   2025250     60200   20.1100  145.8900       5.7        72       952        83
SWIR   2025250     60200   20.0900  145.7900       5.7        96       948        82
SWIR   2025250     60200   20.1100  145.7400       6.2        99       936        75
SWIR   2025250     60200   20.1300  145.5600       7.5       116       894        61
SWIR   2025250     60200   20.1500  145.5400       7.7       116       884        63
SWIR   2025250     60200   20.0600  144.8100      12.8       137       788        72
SWIR   2025250     60200   20.0600  144.6300      11.5       131       743        75
SWIR   2025250     60200   20.0800  148.3800       5.8        53       984        67
SWIR   2025250     60200   20.0100  145.9100       5.4        66       954        64
SWIR   2025250     60200   20.0500  145.7500       6.3       101       929        74
SWIR   2025250     60200   19.9700  145.5700       6.1        86       901        82
SWIR   2025250     60200   19.9600  144.8400      13.1       135       766        71
SWIR   2025250     60200   19.9800  144.8200      12.9       134       765        71
SWIR   2025250     60200   20.0000  144.6500      12.4       136       735        80
SWIR   2025250     60200   20.0200  144.5500      10.7       131       763        84
SWIR   2025250     60200   19.9600  144.4900      13.0       130       768        81
SWIR   2025250     60200   20.0000  144.3900      13.4       120       784        86
SWIR   2025250     60200   20.0400  144.2700      15.0       122       783        77
SWIR   2025250     60200   20.0200  144.2300      14.2       122       767        76
SWIR   2025250     60200   20.0000  144.0600      12.4       110       784        88
SWIR   2025250     60200   19.9600  143.9000       9.9       110       785        82
SWIR   2025250     60200   19.9700  142.7600       8.7       115       846        61
SWIR   2025250     60200   19.9200  148.4600       6.4        55       987        82
SWIR   2025250     60200   19.9600  148.1700       7.8        40       970        87
SWIR   2025250     60200   19.8800  146.2500       5.7        64       959        71
SWIR   2025250     60200   19.8800  146.1600       5.0        72       957        68
SWIR   2025250     60200   19.9100  145.8600       5.4        64       951        68
SWIR   2025250     60200   19.9100  145.7600       8.3        40       924        74
SWIR   2025250     60200   19.8700  145.7400       9.5        38       902        71
SWIR   2025250     60200   19.9100  145.6000       8.3        69       899        93
SWIR   2025250     60200   19.8700  145.5400       9.5        70       899        66
SWIR   2025250     60200   19.8700  145.0100      13.8       134       790        65
SWIR   2025250     60200   19.8800  144.8900      13.4       131       758        82
SWIR   2025250     60200   19.9400  144.8400      13.2       136       756        81
SWIR   2025250     60200   19.8800  144.7000      14.5       149       724        84
SWIR   2025250     60200   19.9200  144.5000      12.6       134       763        82
SWIR   2025250     60200   19.8800  144.4200      12.9       124       739        72
SWIR   2025250     60200   19.9000  144.3100      14.9       127       728        72
SWIR   2025250     60200   19.9200  144.1900      15.0       109       739        88
SWIR   2025250     60200   19.9400  143.9200       9.4       105       763        72
SWIR   2025250     60200   19.8500  143.7000       9.5       118       826        78
SWIR   2025250     60200   19.8600  140.8900       8.1       136       909        73
SWIR   2025250     60200   19.8000  148.5500       4.9        51       955        62
SWIR   2025250     60200   19.8400  146.2700       5.9        66       957        66
SWIR   2025250     60200   19.8600  146.1700       5.1        73       954        78
SWIR   2025250     60200   19.8500  145.8600       6.1        57       944        87
SWIR   2025250     60200   19.8500  145.7400       9.7        37       901        64
SWIR   2025250     60200   19.8500  145.6200       9.3        55       896        66
SWIR   2025250     60200   19.7700  145.4000       7.1       107       845        64
SWIR   2025250     60200   19.7700  145.3600       7.5       110       808        76
SWIR   2025250     60200   19.7700  145.2600       9.0       115       817        62
SWIR   2025250     60200   19.7700  145.1200      12.4       124       793        74
SWIR   2025250     60200   19.7700  145.0200      11.2       120       753        83
SWIR   2025250     60200   19.8400  144.9300      12.8       128       756        84
SWIR   2025250     60200   19.8400  144.8700      12.6       127       733        84
SWIR   2025250     60200   19.8400  144.7100      14.1       144       724        83
SWIR   2025250     60200   19.7600  144.4700       9.9       106       749        92
SWIR   2025250     60200   19.8400  144.4400      12.0       120       748        69
SWIR   2025250     60200   19.7800  144.3400      13.5       123       735        66
SWIR   2025250     60200   19.7500  143.6500      10.5       112       821        93
SWIR   2025250     60200   19.7000  148.5400       5.3        45       959        73
SWIR   2025250     60200   19.7400  148.4700       6.2        46       964        98
SWIR   2025250     60200   19.7000  148.2000       6.8        51       970        79
SWIR   2025250     60200   19.7200  148.0500       4.6        79       965        75
SWIR   2025250     60200   19.6800  146.5600       7.1       105       952        61
SWIR   2025250     60200   19.7200  146.3200       7.4        90       933        61
SWIR   2025250     60200   19.7100  145.8100       9.5        60       970        82
SWIR   2025250     60200   19.6900  145.7100       8.9        67       897        74
SWIR   2025250     60200   19.7500  145.6900      10.9        42       902        63
SWIR   2025250     60200   19.6700  145.5700       7.7        75       874        92
SWIR   2025250     60200   19.6700  145.4500       7.4        97       772        74
SWIR   2025250     60200   19.7500  145.4000       7.4       105       812        63
SWIR   2025250     60200   19.6700  145.2500       8.7        89       763        97
SWIR   2025250     60200   19.7300  145.1600      10.1       111       784        90
SWIR   2025250     60200   19.7500  145.0200      10.3       114       751        85
SWIR   2025250     60200   19.6800  144.9200       9.5       114       729        93
SWIR   2025250     60200   19.6600  144.8800      10.4       125       727        83
SWIR   2025250     60200   19.7000  144.8100      12.7       129       720        80
SWIR   2025250     60200   19.7400  144.4900       9.6       110       748        86
SWIR   2025250     60200   19.7400  144.4700       9.9       106       748        91
SWIR   2025250     60200   19.6800  144.3500      12.1       119       742        76
SWIR   2025250     60200   19.6600  144.1900      10.9       128       733        62
SWIR   2025250     60200   19.6600  144.1000       8.2       111       724        68
SWIR   2025250     60200   19.6800  144.0800       9.0       115       728        63
SWIR   2025250     60200   19.6800  143.6900      11.8       110       795        92
SWIR   2025250     60200   19.6000  148.7400       7.8        43       980        86
SWIR   2025250     60200   19.6800  148.1800       5.9        52       971        73
SWIR   2025250     60200   19.6800  148.1600       4.7        59       974        66
SWIR   2025250     60200   19.6000  146.4700       9.6       122       930        70
SWIR   2025250     60200   19.6200  146.4500       9.3       121       930        70
SWIR   2025250     60200   19.5700  145.7800       7.3        87       888        86
SWIR   2025250     60200   19.5700  145.7600       7.5        82       882        92
SWIR   2025250     60200   19.6300  145.6700       8.0        74       876        86
SWIR   2025250     60200   19.5700  145.5600       7.6        84       794        94
SWIR   2025250     60200   19.6500  145.4700       7.3        92       786        75
SWIR   2025250     60200   19.5700  145.3500       9.1        88       749        83
SWIR   2025250     60200   19.6500  145.2300       9.2        89       761        96
SWIR   2025250     60200   19.5900  145.0900       8.1        90       746        99
SWIR   2025250     60200   19.5700  145.0700       8.0        89       745        98
SWIR   2025250     60200   19.6400  144.9000      10.1       122       728        88
SWIR   2025250     60200   19.6400  144.8800      10.8       128       727        82
SWIR   2025250     60200   19.6000  144.7600      13.1       131       717        65
SWIR   2025250     60200   19.6200  144.3500      12.3       124       739        83
SWIR   2025250     60200   19.6200  144.2300      12.5       123       733        78
SWIR   2025250     60200   19.6200  144.1300       9.7       113       727        93
SWIR   2025250     60200   19.6400  144.0800       7.6       114       725        70
SWIR   2025250     60200   19.6000  143.9600      11.1       127       737        77
SWIR   2025250     60200   19.5800  141.7900      10.3       101       707        77
SWIR   2025250     60200   19.5400  141.6600      10.0       104       706        74
SWIR   2025250     60200   19.5400  141.5800       8.9       104       724        70
SWIR   2025250     60200   19.5400  141.4000       9.4       123       847        71
SWIR   2025250     60200   19.5400  141.3800       9.4       125       855        73
SWIR   2025250     60200   19.6200  141.2700       8.7       128       880        67
SWIR   2025250     60200   19.5400  140.8200       6.5       113       880        75
SWIR   2025250     60200   19.5400  140.8000       6.2       115       891        62
SWIR   2025250     60200   19.5400  146.6600       9.4        66       958        91
SWIR   2025250     60200   19.4800  146.5800      10.5        75       938        74
SWIR   2025250     60200   19.5600  146.4900       9.6       115       925        67
SWIR   2025250     60200   19.5500  145.7600       7.3        84       876        93
SWIR   2025250     60200   19.4900  145.7400       7.2        79       828        97
SWIR   2025250     60200   19.4700  145.5800       6.9        71       776        96
SWIR   2025250     60200   19.5100  145.5000       6.8        88       776        98
SWIR   2025250     60200   19.5500  145.3800       8.8        92       755        92
SWIR   2025250     60200   19.5100  145.2600      10.1       100       748        78
SWIR   2025250     60200   19.5300  145.2500      10.1        94       748        85
SWIR   2025250     60200   19.4700  145.1400       8.8        95       730        99
SWIR   2025250     60200   19.5500  145.0500       7.9        91       742        97
SWIR   2025250     60200   19.5500  144.9300      10.0       118       733        81
SWIR   2025250     60200   19.5400  144.8400      12.6       126       726        68
SWIR   2025250     60200   19.5000  144.3200      12.3       118       734        77
SWIR   2025250     60200   19.4600  144.2400      13.6       109       728        85
SWIR   2025250     60200   19.4800  144.1100      12.0       109       727        80
SWIR   2025250     60200   19.4500  141.8300       9.7       107       709        89
SWIR   2025250     60200   19.5000  141.5400       8.7       110       711        68
SWIR   2025250     60200   19.5200  141.5200       8.1       107       726        61
SWIR   2025250     60200   19.4800  141.3800       8.7       121       821        77
SWIR   2025250     60200   19.4600  141.3000       9.8       123       851        86
SWIR   2025250     60200   19.5200  141.2300       9.8       122       879        72
SWIR   2025250     60200   19.4400  140.8200       8.5       113       839        82
SWIR   2025250     60200   19.4100  149.0800       7.9         1       947        61
SWIR   2025250     60200   19.4100  149.0400       7.7         6       947        62
SWIR   2025250     60200   19.4200  146.5600      11.7        50       931        87
SWIR   2025250     60200   19.3800  146.5400      12.3        36       928        75
SWIR   2025250     60200   19.4000  146.4200       9.9        53       922        79
SWIR   2025250     60200   19.3800  145.9400       6.3        57       868        66
SWIR   2025250     60200   19.4500  145.8100       6.2        88       919        88
SWIR   2025250     60200   19.4500  145.7700       7.1        73       880        98
SWIR   2025250     60200   19.4500  145.6100       7.8        60       782        91
SWIR   2025250     60200   19.4100  145.5300       6.1        85       771        96
SWIR   2025250     60200   19.3900  145.4300       8.3       120       760        73
SWIR   2025250     60200   19.4300  145.3400      10.2       118       744        82
SWIR   2025250     60200   19.3900  145.2000       8.8       105       726       100
SWIR   2025250     60200   19.4500  145.1800       9.5       101       733        96
SWIR   2025250     60200   19.4500  145.0800       8.6       102       727        99
SWIR   2025250     60200   19.4100  144.9600       8.6       100       730        81
SWIR   2025250     60200   19.4300  144.8300       9.9       100       736        75
SWIR   2025250     60200   19.4000  144.7900       9.8       102       733        90
SWIR   2025250     60200   19.4000  144.4000      11.3       107       728        84
SWIR   2025250     60200   19.3800  144.1200      13.7       105       727        76
SWIR   2025250     60200   19.3500  142.2700      11.3       106       703        82
SWIR   2025250     60200   19.3700  141.9800      11.6       111       796        68
SWIR   2025250     60200   19.4300  141.8300       9.9       109       718        93
SWIR   2025250     60200   19.4100  141.7900       9.5       112       707        94
SWIR   2025250     60200   19.3600  141.6300       9.4       112       719        74
SWIR   2025250     60200   19.3800  141.3600       9.2       111       796        87
SWIR   2025250     60200   19.3800  140.8700      11.2       112       839        94
SWIR   2025250     60200   19.4200  140.8200       9.0       113       845        87
SWIR   2025250     60200   19.3100  149.3100       6.1        16       944        80
SWIR   2025250     60200   19.3100  149.2500       6.8         9       941        83
SWIR   2025250     60200   19.3300  149.1300       7.9         0       909        85
SWIR   2025250     60200   19.3900  149.0200       7.5         5       938        72
SWIR   2025250     60200   19.3300  148.9700       6.4         7       851        74
SWIR   2025250     60200   19.3400  146.5100      11.3        35       927        62
SWIR   2025250     60200   19.3200  145.9000       7.1        50       877        61
SWIR   2025250     60200   19.3100  145.8600       8.1        48       896        79
SWIR   2025250     60200   19.3100  145.7800       8.4        57       924        98
SWIR   2025250     60200   19.2700  145.6000       6.2        90       766        91
SWIR   2025250     60200   19.2700  145.5800       6.3        95       756        87
SWIR   2025250     60200   19.2900  145.4300       7.9       126       732        78
SWIR   2025250     60200   19.2700  145.3700       7.9       122       720        89
SWIR   2025250     60200   19.2900  145.2500       8.1       103       726        99
SWIR   2025250     60200   19.3100  145.1500       9.8       122       722        92
SWIR   2025250     60200   19.3500  145.0800      10.3       128       717        87
SWIR   2025250     60200   19.3300  144.9600       8.1        97       731        83
SWIR   2025250     60200   19.3300  144.9000       7.8        83       739        88
SWIR   2025250     60200   19.3400  144.4900       9.9        97       723        97
SWIR   2025250     60200   19.3400  144.4300      11.0       102       724        93
SWIR   2025250     60200   19.3300  142.3500      10.2       108       751        67
SWIR   2025250     60200   19.3300  142.3100      10.7       107       745        72
SWIR   2025250     60200   19.3100  142.1700      11.9       102       730        74
SWIR   2025250     60200   19.2900  142.0900      13.2       101       785        73
SWIR   2025250     60200   19.2900  142.0200      13.7       104       857        91
SWIR   2025250     60200   19.3300  141.8400      12.0       114       846        71
SWIR   2025250     60200   19.3300  141.8000      11.4       116       804        78
SWIR   2025250     60200   19.3300  141.7300      10.8       112       788        81
SWIR   2025250     60200   19.3200  141.5900       9.5       101       748        66
SWIR   2025250     60200   19.3200  141.5100       9.7       100       743        76
SWIR   2025250     60200   19.2400  141.4300      10.0       105       770        81
SWIR   2025250     60200   19.3200  141.3400       8.9       111       818        85
SWIR   2025250     60200   19.2400  141.2200      12.2       122       891        65
SWIR   2025250     60200   19.2300  149.3800       5.2         7       949        65
SWIR   2025250     60200   19.2300  149.2800       6.0        19       915        91
SWIR   2025250     60200   19.2900  149.2700       6.4        13       936        85
SWIR   2025250     60200   19.2300  149.1200       7.8        13       876        87
SWIR   2025250     60200   19.2500  149.0600       8.2         7       840        81
SWIR   2025250     60200   19.2100  148.8400       4.3        15       970        63
SWIR   2025250     60200   19.2500  147.6500       6.4        44       976        63
SWIR   2025250     60200   19.2100  147.5700       5.5        62       967        82
SWIR   2025250     60200   19.1900  147.5300       5.6        65       958        82
SWIR   2025250     60200   19.1800  146.4000       8.8        60       923        61
SWIR   2025250     60200   19.1800  145.8900       7.7        73       858        90
SWIR   2025250     60200   19.2600  145.8600       8.3        54       882        87
SWIR   2025250     60200   19.1700  145.7700       8.4        81       849        90
SWIR   2025250     60200   19.2300  145.6000       7.0       113       741        76
SWIR   2025250     60200   19.2300  145.5800       7.2       115       732        77
SWIR   2025250     60200   19.2300  145.4600       7.7       118       716        93
SWIR   2025250     60200   19.2500  145.3700       7.9       120       722        91
SWIR   2025250     60200   19.2500  145.2900       7.9       110       727        96
SWIR   2025250     60200   19.1700  145.1500      10.9       126       726        81
SWIR   2025250     60200   19.1900  145.0100      10.0       132       714        76
SWIR   2025250     60200   19.2300  144.9500       8.8       115       728        89
SWIR   2025250     60200   19.2300  144.8200      10.7       109       740        67
SWIR   2025250     60200   19.2400  144.5800      11.0       108       722        90
SWIR   2025250     60200   19.2300  142.3400      13.0       112       861        71
SWIR   2025250     60200   19.1500  141.9500      16.4       105       883        75
SWIR   2025250     60200   19.1500  141.8400      15.9       105       884        73
SWIR   2025250     60200   19.1500  141.7200      14.1       112       869        80
SWIR   2025250     60200   19.2300  141.6300      10.9        97       838        77
SWIR   2025250     60200   19.2300  141.5100      10.5        96       783        70
SWIR   2025250     60200   19.2200  141.4100      10.2       109       798        75
SWIR   2025250     60200   19.2000  141.0200      13.1       108       885        72
SWIR   2025250     60200   19.1600  140.9300      13.5       103       878        91
SWIR   2025250     60200   19.1400  140.7500      13.8       103       917        95
SWIR   2025250     60200   19.1700  149.3200       5.9        18       837        75
SWIR   2025250     60200   19.1300  149.2900       6.2        22       816        66
SWIR   2025250     60200   19.1100  149.1700       6.4        21       831        86
SWIR   2025250     60200   19.1900  148.8400       4.4        15       968        64
SWIR   2025250     60200   19.0900  147.5400       4.4        65       952        76
SWIR   2025250     60200   19.1700  147.5100       5.7        63       953        86
SWIR   2025250     60200   19.1400  146.3600       9.2        60       922        66
SWIR   2025250     60200   19.1400  145.8700       8.4        76       838        99
SWIR   2025250     60200   19.1600  145.8500       8.4        77       844        99
SWIR   2025250     60200   19.0700  145.6700      10.2       132       742        79
SWIR   2025250     60200   19.1500  145.6200       9.9       128       717        89
SWIR   2025250     60200   19.1300  145.5000       9.3       116       709        96
SWIR   2025250     60200   19.1100  145.4000       8.9       110       721        97
SWIR   2025250     60200   19.0700  145.3600       9.2       107       729        96
SWIR   2025250     60200   19.0700  145.1800      10.3       119       725        82
SWIR   2025250     60200   19.0700  145.0800      11.8       128       713        61
SWIR   2025250     60200   19.0700  145.0600      11.9       132       713        62
SWIR   2025250     60200   19.0700  144.8900      13.9       147       735        76
SWIR   2025250     60200   19.0500  142.4300      17.4       101       884        63
SWIR   2025250     60200   19.0700  142.3400      15.9       106       876        70
SWIR   2025250     60200   19.1300  142.0700      17.3        99       875        78
SWIR   2025250     60200   19.0500  141.7000      15.5       122       830        68
SWIR   2025250     60200   19.0900  141.6800      14.3       117       841        75
SWIR   2025250     60200   19.1100  141.5200      11.6       105       838        78
SWIR   2025250     60200   19.0500  141.3100      14.6       104       900        82
SWIR   2025250     60200   19.0500  141.2700      15.3       108       900        89
SWIR   2025250     60200   19.0600  140.9800      10.3       114       878        87
SWIR   2025250     60200   19.0400  140.9200      10.3       106       877        91
SWIR   2025250     60200   19.0400  140.8600      11.8       101       854        90
SWIR   2025250     60200   19.0800  140.7500      15.9        97       891        83
SWIR   2025250     60200   19.0200  149.5400       6.0         1       853        60
SWIR   2025250     60200   19.0800  149.4900       5.5         0       823        64
SWIR   2025250     60200   19.0900  149.3500       6.5        21       814        60
SWIR   2025250     60200   19.0700  149.2700       6.9        20       807        73
SWIR   2025250     60200   19.0900  149.1500       6.0        19       836        87
SWIR   2025250     60200   18.9800  146.0400      10.9        28       862        61
SWIR   2025250     60200   19.0600  145.9000       8.3        68       799        96
SWIR   2025250     60200   19.0400  145.7500       8.1       109       756        80
SWIR   2025250     60200   19.0000  145.7000       8.2       116       714        94
SWIR   2025250     60200   18.9700  145.4500       8.5       100       731        89
SWIR   2025250     60200   18.9700  145.3700       9.2        94       738        98
SWIR   2025250     60200   19.0500  145.3200       9.4       107       729        95
SWIR   2025250     60200   19.0500  145.2000      10.5       119       727        83
SWIR   2025250     60200   19.0500  145.0800      12.2       132       713        68
SWIR   2025250     60200   19.0300  145.0400      14.8       148       713        78
SWIR   2025250     60200   18.9900  141.5800      13.7       119       773        68
SWIR   2025250     60200   19.0300  141.2500      14.4       107       898        79
SWIR   2025250     60200   18.9900  141.0800       9.4       116       895        88
SWIR   2025250     60200   19.0200  140.9400      10.0       109       877        88
SWIR   2025250     60200   18.9600  140.8800      10.6       106       867        87
SWIR   2025250     60200   18.9800  140.7100      15.8       103       864        78
SWIR   2025250     60200   18.9400  140.6900      15.2       106       853        63
SWIR   2025250     60200   18.9700  149.3000       7.5        20       800        74
SWIR   2025250     60200   18.8800  146.3000       8.7        39       919        68
SWIR   2025250     60200   18.8800  146.2300      10.7        31       914        65
SWIR   2025250     60200   18.9000  146.1100      12.9        26       887        73
SWIR   2025250     60200   18.8800  146.0500      10.6        41       887        69
SWIR   2025250     60200   18.9200  145.9100       6.8        71       754        87
SWIR   2025250     60200   18.9000  145.8500       8.0        94       724        88
SWIR   2025250     60200   18.8800  145.6000       6.7       100       704        75
SWIR   2025250     60200   18.9500  145.4500       8.3        98       736        88
SWIR   2025250     60200   18.9300  145.3700       9.4        86       748        95
SWIR   2025250     60200   18.8700  145.2900      10.8       120       727        82
SWIR   2025250     60200   18.9100  145.2100      12.4       131       712        80
SWIR   2025250     60200   18.8700  144.9300      14.7       155       710        63
SWIR   2025250     60200   18.8600  142.8700      15.1       106       861        64
SWIR   2025250     60200   18.8500  141.1100       7.6       101       846        76
SWIR   2025250     60200   18.8700  140.9400       7.7       121       877        65
SWIR   2025250     60200   18.9300  140.8400      12.4       106       863        93
SWIR   2025250     60200   18.9200  140.7500      15.3       104       852        74
SWIR   2025250     60200   18.9200  140.7300      15.6       104       852        67
SWIR   2025250     60200   18.8200  149.7000       4.0         8       927        71
SWIR   2025250     60200   18.8400  149.5300       4.5        31       907        83
SWIR   2025250     60200   18.8600  149.3900       6.3        24       797        62
SWIR   2025250     60200   18.8400  148.2900       5.8        46       982        66
SWIR   2025250     60200   18.8100  146.5700       9.0        36       923        66
SWIR   2025250     60200   18.7800  146.4400       8.8        36       923        68
SWIR   2025250     60200   18.8600  146.2600      10.3        27       918        63
SWIR   2025250     60200   18.8600  146.2200      11.3        30       914        70
SWIR   2025250     60200   18.7800  146.1000      14.5        36       882        85
SWIR   2025250     60200   18.8000  146.0200      10.4        56       899        87
SWIR   2025250     60200   18.7800  145.9300       8.0        96       751        90
SWIR   2025250     60200   18.8400  145.6000       7.0        85       708        71
SWIR   2025250     60200   18.8000  145.5300       8.2        71       733        63
SWIR   2025250     60200   18.8500  145.4400       7.8        96       755        80
SWIR   2025250     60200   18.7700  145.2800      12.5       122       728        83
SWIR   2025250     60200   18.8100  145.2600      12.2       125       714        83
SWIR   2025250     60200   18.7800  142.9800      11.0       111       840        61
SWIR   2025250     60200   18.7700  140.9900       7.2       111       860        76
SWIR   2025250     60200   18.7000  148.2600       6.6        38       973        84
SWIR   2025250     60200   18.7400  148.2500       6.3        40       972        75
SWIR   2025250     60200   18.7400  147.8700       6.5        35       964        64
SWIR   2025250     60200   18.6900  146.5300      16.7        15       922        83
SWIR   2025250     60200   18.7300  146.4700      13.1        23       922        78
SWIR   2025250     60200   18.6900  146.3500      10.5        44       918        96
SWIR   2025250     60200   18.6800  146.2900      12.3        42       918        97
SWIR   2025250     60200   18.6800  146.1900      14.3        32       889        87
SWIR   2025250     60200   18.7400  146.0600      12.7        41       871        84
SWIR   2025250     60200   18.7600  145.9400       8.0        87       798        86
SWIR   2025250     60200   18.7600  145.9000       8.3        94       712        98
SWIR   2025250     60200   18.6800  145.6300      11.2        47       730        77
SWIR   2025250     60200   18.6800  145.6100      10.8        48       737        78
SWIR   2025250     60200   18.7000  145.2700      14.5       135       728        81
SWIR   2025250     60200   18.7300  140.9900       8.3       112       862        77
SWIR   2025250     60200   18.6700  146.5300      16.6        15       921        84
SWIR   2025250     60200   18.6700  146.4100      11.5        38       906        95
SWIR   2025250     60200   18.6700  146.3300      11.5        45       905        98
SWIR   2025250     60200   18.5900  146.2500      13.9        42       869        86
SWIR   2025250     60200   18.6400  146.1700      14.2        34       882        83
SWIR   2025250     60200   18.5800  145.7000       8.9       104       722        89
SWIR   2025250     60200   18.6400  145.6200      10.0        50       743        79
SWIR   2025250     60200   18.6600  145.5800      10.5        49       743        78
SWIR   2025250     60200   18.5500  146.5000      14.1        18       905        82
SWIR   2025250     60200   18.4900  146.4700      12.9        23       879        85
SWIR   2025250     60200   18.5100  146.3000      12.5        44       839        87
SWIR   2025250     60200   18.4900  146.2800      12.1        47       846        89
SWIR   2025250     60200   18.5200  145.7100       9.1       120       707        94
SWIR   2025250     60200   18.5200  145.6900       8.3       113       738        90
SWIR   2025250     60200   18.5400  145.6000       7.7        63       818        79
SWIR   2025250     60200   18.4700  146.4900      12.4        22       905        83
SWIR   2025250     60200   18.4700  146.4700      12.0        24       901        88
SWIR   2025250     60200   18.4500  146.3500      10.6        43       839        89
SWIR   2025250     60200   18.4700  146.2600      11.5        49       848        91
SWIR   2025250     60200   18.4600  145.6900       8.4       121       758        85
SWIR   2025250     60200   18.3300  148.3500       6.0        42       972        95
SWIR   2025250     60200   18.3500  148.3300       5.4        48       974        95
SWIR   2025250     60200   18.3000  147.8000       5.7        31       974        91
SWIR   2025250     60200   18.3300  146.4600       7.1        69       907        90
SWIR   2025250     60200   18.2900  146.3600       9.2        49       879        98
SWIR   2025250     60200   18.3700  146.2700      10.9        48       886        97
SWIR   2025250     60200   18.2900  146.1900      11.4        49       894        93
SWIR   2025250     60200   18.2400  147.6900       5.2        29       976        86
SWIR   2025250     60200   18.2300  146.5000       9.5        51       909        78
SWIR   2025250     60200   18.1900  146.4700      11.4        41       902        89
SWIR   2025250     60200   18.2100  146.3000      13.2        35       851        85
SWIR   2025250     60200   18.2100  146.2200      11.9        43       841        89
SWIR   2025250     60200   18.1700  147.6500       5.1        33       974        62
SWIR   2025250     60200   18.1100  146.4300      12.7        36       898        88
SWIR   2025250     60200   18.1700  146.3200      13.0        35       847        86
SWIR   2025250     60200   18.1700  146.2800      12.9        35       831        84
SWIR   2025250     60200   18.1400  145.4000      10.6        88       712        74
SWIR   2025250     60200   18.0100  147.6400       6.3        27       974        77
SWIR   2025250     60200   18.0100  147.6200       7.3        34       974        87
SWIR   2025250     60200   18.0100  147.4600      11.7        44       942        96
SWIR   2025250     60200   18.0000  146.4000       9.3        48       904        97
SWIR   2025250     60200   18.0300  146.3300      10.1        43       842        88
SWIR   2025250     60200   18.0300  145.4500      11.0        96       718        63
SWIR   2025250     60200   17.9300  147.8500       6.0        39       981        67
SWIR   2025250     60200   17.9300  147.6700       6.7        34       975        89
SWIR   2025250     60200   17.9100  147.6500       7.6        39       971        87
SWIR   2025250     60200   17.9700  147.4800      11.6        44       954        95
SWIR   2025250     60200   17.9100  147.3700      10.6        42       940        99
SWIR   2025250     60200   17.9400  146.4400       9.2        54       921        93
SWIR   2025250     60200   17.9800  146.4000       9.0        51       911        96
SWIR   2025250     60200   17.9800  146.3200       9.2        49       856        89
SWIR   2025250     60200   17.8900  147.6700       6.4        35       973        84
SWIR   2025250     60200   17.8300  147.4700      10.8        44       954        95
SWIR   2025250     60200   17.8600  146.4700       9.6        48       944        87
SWIR   2025250     60200   17.8000  146.3700      11.7        45       902        98
SWIR   2025250     60200   17.8200  146.2400      11.5        41       876        93
SWIR   2025250     60200   17.8100  145.6500       9.1        79       730        74
SWIR   2025250     60200   17.7100  147.6000       5.7        45       965        64
SWIR   2025250     60200   17.7500  147.4800       9.4        44       964        97
SWIR   2025250     60200   17.7200  146.5400       7.0        40       963        79
SWIR   2025250     60200   17.7200  146.4800       8.8        36       960        95
SWIR   2025250     60200   17.7000  146.4000      12.3        37       938        96
SWIR   2025250     60200   17.7200  146.2700      11.8        38       912        97
SWIR   2025250     60200   17.7200  145.7400      10.9        46       730        83
SWIR   2025250     60200   17.7000  145.7200      11.6        39       721        78
SWIR   2025250     60200   17.7700  145.6300       9.5        62       742        63
SWIR   2025250     60200   17.6500  147.4200       8.9        45       965        86
SWIR   2025250     60200   17.6300  147.2600       7.6        37       968        94
SWIR   2025250     60200   17.6400  146.5000       7.9        38       963        95
SWIR   2025250     60200   17.6400  146.2400      10.5        39       934        97
SWIR   2025250     60200   17.6000  146.2000       9.7        36       937        89
SWIR   2025250     60200   17.5800  146.2000       9.7        36       937        89
SWIR   2025250     60200   17.5300  144.9200      15.7        20       712        62
SWIR   2025250     60200   17.5700  144.8600      14.3        25       708        66
SWIR   2025250     60200   17.4700  146.7000       6.0        33       977        72
SWIR   2025250     60200   17.4500  146.4100      14.9        29       950        88
SWIR   2025250     60200   17.4800  146.2000      10.8        34       941        93
SWIR   2025250     60200   17.3600  147.7700       9.6        41       968        98
SWIR   2025250     60200   17.3500  146.8900       5.0        32       971        60
SWIR   2025250     60200   17.3000  144.9600      14.1        29       735        81
SWIR   2025250     60200   17.3200  144.8100      15.9        17       715        78
SWIR   2025250     60200   17.3800  144.7600      17.9        13       704        81
SWIR   2025250     60200   17.2800  144.9400      13.0        32       744        81
SWIR   2025250     60200   17.2200  144.8300      11.6        25       775        83
SWIR   2025250     60200   17.2200  144.8100      11.4        25       779        83
SWIR   2025250     60200   17.1300  148.3000       6.4        42       970        93
SWIR   2025250     60200   17.1900  148.2400       6.2        34       970        76
SWIR   2025250     60200   17.1300  147.7100       8.5        43       962        83
SWIR   2025250     60200   17.1200  144.9600      11.7        29       872        96
SWIR   2025250     60200   17.1800  144.9200      11.8        30       869        89
SWIR   2025250     60200   17.1100  148.2800       6.9        41       969        92
SWIR   2025250     60200   17.0300  148.0400       7.3        34       961        77
SWIR   2025250     60200   17.1100  147.6900       8.3        44       966        86
SWIR   2025250     60200   17.0500  147.5500       7.9        39       966        89
SWIR   2025250     60200   17.0400  146.9700       5.7        54       928        64
SWIR   2025250     60200   17.0100  145.0700      13.4        15       856        97
SWIR   2025250     60200   17.0100  144.9500      13.7        17       862        95
SWIR   2025250     60200   16.9600  148.5000       5.4        42       970        64
SWIR   2025250     60200   16.9900  148.0700       7.3        37       954        79
SWIR   2025250     60200   17.0100  148.0600       7.4        35       951        80
SWIR   2025250     60200   16.9500  147.6800       6.8        37       966        76
SWIR   2025250     60200   16.9900  147.6000       7.1        37       964        91
SWIR   2025250     60200   16.9900  147.5700       8.2        37       965        92
SWIR   2025250     60200   16.9500  147.4300       9.1        36       963        88
SWIR   2025250     60200   16.9800  146.9800       6.7        48       926        73
SWIR   2025250     60200   16.9200  146.8800       5.9        45       920        74
SWIR   2025250     60200   16.9900  145.0600      13.6        15       857        94
SWIR   2025250     60200   16.9900  144.9500      14.0        17       862        92
SWIR   2025250     60200   16.9200  148.5000       5.5        41       970        71
SWIR   2025250     60200   16.8600  148.3600       7.1        40       965        97
SWIR   2025250     60200   16.8400  148.0600       7.2        46       971        84
SWIR   2025250     60200   16.8300  147.6100       8.0        43       962        89
SWIR   2025250     60200   16.9100  147.4600       8.4        37       961        97
SWIR   2025250     60200   16.9100  147.0000       8.8        40       932        79
SWIR   2025250     60200   16.9100  146.9000       6.3        47       926        87
SWIR   2025250     60200   16.8600  146.7000       7.3        26       910        62
SWIR   2025250     60200   16.8700  144.9800      13.4        22       850        91
SWIR   2025250     60200   16.7700  148.5700       4.6        39       976        70
SWIR   2025250     60200   16.8200  148.4500       6.6        40       970        83
SWIR   2025250     60200   16.8000  148.2900       7.2        43       966        97
SWIR   2025250     60200   16.8000  148.0800       7.9        47       973        81
SWIR   2025250     60200   16.8000  148.0600       7.3        46       972        84
SWIR   2025250     60200   16.7600  147.7100      13.5        53       980        65
SWIR   2025250     60200   16.8100  147.5900       8.9        46       965        81
SWIR   2025250     60200   16.7900  146.8900       7.1        41       925        63
SWIR   2025250     60200   16.7800  146.4600       6.8        36       906        60
SWIR   2025250     60200   16.7300  146.3600      13.4        42       905        72
SWIR   2025250     60200   16.7300  146.2900      14.6        37       910        69
SWIR   2025250     60200   16.6700  148.7700       8.7        36       972        69
SWIR   2025250     60200   16.6500  148.2400       8.4        45       963        94
SWIR   2025250     60200   16.6400  147.9700      11.7        37       945        96
SWIR   2025250     60200   16.7000  147.9200      10.6        36       940        97
SWIR   2025250     60200   16.6600  147.8200       7.9        37       946        91
SWIR   2025250     60200   16.7200  147.6600      12.0        52       976        89
SWIR   2025250     60200   16.6600  147.4500       7.5        41       952        97
SWIR   2025250     60200   16.6300  146.9400       4.5        19       946        72
SWIR   2025250     60200   16.6300  146.9000       4.8        18       929        83
SWIR   2025250     60200   16.7100  146.5000       7.1        28       904        68
SWIR   2025250     60200   16.7100  146.3400      13.7        41       906        73
SWIR   2025250     60200   16.6300  146.2800      12.7        37       903        61
SWIR   2025250     60200   16.5600  147.8300       7.9        34       946        95
SWIR   2025250     60200   16.5400  147.7500       6.3        31       952        88
SWIR   2025250     60200   16.5800  147.6400       7.8        41       958        95
SWIR   2025250     60200   16.5600  147.6000       8.6        43       952        98
SWIR   2025250     60200   16.5600  147.5000       8.7        45       956        95
SWIR   2025250     60200   16.5600  147.3200       7.4        46       961        89
SWIR   2025250     60200   16.5400  147.3000       7.6        45       961        96
SWIR   2025250     60200   16.6100  146.9400       4.4        19       944        75
SWIR   2025250     60200   16.5900  146.8400       6.0        24       917        64
SWIR   2025250     60200   16.5500  146.8200       8.3        24       916        67
SWIR   2025250     60200   16.5700  146.7200       8.8        36       912        73
SWIR   2025250     60200   16.5500  146.4500       6.5        26       901        76
SWIR   2025250     60200   16.6100  146.3400      10.6        38       900        67
SWIR   2025250     60200   16.5200  149.3700       6.0        47       965        78
SWIR   2025250     60200   16.4600  149.2900       7.3        42       971        87
SWIR   2025250     60200   16.4600  149.2100       6.2        44       979        75
SWIR   2025250     60200   16.4600  148.9700       6.5        38       980        92
SWIR   2025250     60200   16.5400  148.8400       7.0        41       970        78
SWIR   2025250     60200   16.4900  148.6600      11.5        29       968        91
SWIR   2025250     60200   16.4500  148.0200       9.1        51       973        94
SWIR   2025250     60200   16.5300  147.8800       8.9        30       951        83
SWIR   2025250     60200   16.5200  147.7900       6.5        32       951        92
SWIR   2025250     60200   16.5200  147.7700       6.3        31       955        92
SWIR   2025250     60200   16.5200  147.6100       8.7        42       949        98
SWIR   2025250     60200   16.5200  147.5000       8.4        43       952        95
SWIR   2025250     60200   16.5200  147.4800       8.2        43       952        93
SWIR   2025250     60200   16.4400  147.3700       5.9        44       953        92
SWIR   2025250     60200   16.4400  147.2400       6.0        30       958        86
SWIR   2025250     60200   16.4600  147.1200       5.9        16       957        89
SWIR   2025250     60200   16.4400  147.0000       5.4        22       961        78
SWIR   2025250     60200   16.4400  146.9900       5.2        23       962        86
SWIR   2025250     60200   16.5200  146.8200      10.1        22       917        65
SWIR   2025250     60200   16.4400  146.7900      12.4        17       915        61
SWIR   2025250     60200   16.5200  146.7000      10.2        32       911        69
SWIR   2025250     60200   16.4300  146.3100       9.5        26       893        63
SWIR   2025250     60200   16.4400  149.4000       7.9        41       966        71
SWIR   2025250     60200   16.3600  149.1800       6.5        42       965        81
SWIR   2025250     60200   16.4200  148.9900       6.2        36       970        87
SWIR   2025250     60200   16.4400  148.9500       6.5        37       978        98
SWIR   2025250     60200   16.4400  148.8400       7.2        41       971        91
SWIR   2025250     60200   16.4400  148.6200      11.3        34       968        93
SWIR   2025250     60200   16.4300  147.9000       9.5        48       968        97
SWIR   2025250     60200   16.3900  147.8200      10.4        51       959        92
SWIR   2025250     60200   16.4100  147.7000       9.9        44       954        97
SWIR   2025250     60200   16.4100  147.6200       9.7        41       939        98
SWIR   2025250     60200   16.4100  147.4900       7.3        35       921        96
SWIR   2025250     60200   16.4100  147.4300       6.7        38       936        92
SWIR   2025250     60200   16.3500  147.3700       5.0        34       920        69
SWIR   2025250     60200   16.4200  147.2600       5.9        37       956        83
SWIR   2025250     60200   16.4000  147.0600       5.3        17       951        79
SWIR   2025250     60200   16.3600  146.9000       6.3        25       944        86
SWIR   2025250     60200   16.3800  146.8300      11.5        12       926        80
SWIR   2025250     60200   16.3800  146.7700      11.5        17       913        60
SWIR   2025250     60200   16.4100  146.2900       9.7        27       892        67
SWIR   2025250     60200   16.3300  149.2400       6.5        42       968        72
SWIR   2025250     60200   16.3100  149.1600       6.4        41       963        82
SWIR   2025250     60200   16.3000  149.0400       7.3        34       972        99
SWIR   2025250     60200   16.2700  149.0200       8.0        31       959        98
SWIR   2025250     60200   16.3000  148.9200       9.8        24       960        90
SWIR   2025250     60200   16.3200  148.6300       7.9        46       957        91
SWIR   2025250     60200   16.2900  147.8900      11.7        51       962        95
SWIR   2025250     60200   16.3100  147.7700      10.3        47       958        98
SWIR   2025250     60200   16.2500  147.7100       9.3        43       955        95
SWIR   2025250     60200   16.2500  147.5600       8.3        38       926        83
SWIR   2025250     60200   16.2700  147.4600       6.1        31       914        73
SWIR   2025250     60200   16.2900  147.4400       6.0        31       915        73
SWIR   2025250     60200   16.3300  147.2700       4.7        31       932        79
SWIR   2025250     60200   16.3000  146.9000       6.6        26       930        92
SWIR   2025250     60200   16.2600  146.8000      10.5        14       923        81
SWIR   2025250     60200   16.2400  146.5900       7.4        29       910        96
SWIR   2025250     60200   16.2500  149.2300       6.6        42       966        73
SWIR   2025250     60200   16.2500  149.1900       6.2        44       967        78
SWIR   2025250     60200   16.2300  148.9000      11.0        23       940        84
SWIR   2025250     60200   16.1700  148.7600       7.4        38       935        98
SWIR   2025250     60200   16.2200  148.6600       6.4        43       955        90
SWIR   2025250     60200   16.2100  147.7900      10.2        44       955        99
SWIR   2025250     60200   16.1700  147.6100       8.5        42       935        97
SWIR   2025250     60200   16.2300  147.4800       6.4        32       918        66
SWIR   2025250     60200   16.2300  147.3800       5.6        24       926        76
SWIR   2025250     60200   16.2300  147.3600       5.4        23       921        75
SWIR   2025250     60200   16.1900  146.9100       8.2        27       922       100
SWIR   2025250     60200   16.1900  146.8500       8.0        27       930        99
SWIR   2025250     60200   16.1500  146.7400      11.8        25       917        70
SWIR   2025250     60200   16.1500  146.6800      11.3        28       912        68
SWIR   2025250     60200   16.2200  146.5500       7.4        27       910        83
SWIR   2025250     60200   16.1400  146.2100       7.4        44       795        86
SWIR   2025250     60200   16.1500  149.0900       7.1        47       943        75
SWIR   2025250     60200   16.1300  148.9700       8.3        33       945        84
SWIR   2025250     60200   16.1500  148.8500       9.4        27       929        90
SWIR   2025250     60200   16.1300  147.5300       8.1        54       949        91
SWIR   2025250     60200   16.1000  147.4500       5.6        41       946        86
SWIR   2025250     60200   16.1100  147.3300       4.9         5       922        82
SWIR   2025250     60200   16.1300  146.9700      10.4        37       937        93
SWIR   2025250     60200   16.0900  146.8500       7.5       323       953        76
SWIR   2025250     60200   16.1100  146.6800       9.8        32       911        73
SWIR   2025250     60200   16.0500  146.5900      10.7        50       908        85
SWIR   2025250     60200   16.0500  146.3600       4.7        22       907        86
SWIR   2025250     60200   15.9800  149.1700       9.2        58       968        63
SWIR   2025250     60200   16.0000  149.0800       7.7        55       947        65
SWIR   2025250     60200   15.9900  148.7200       7.8        42       954        92
SWIR   2025250     60200   16.0400  147.6000       9.9        57       940        83
SWIR   2025250     60200   16.0400  147.4800       7.2        57       943        81
SWIR   2025250     60200   16.0000  147.3600       4.6        15       939        78
SWIR   2025250     60200   16.0000  147.3500       4.8        10       934        82
SWIR   2025250     60200   15.9700  146.4900       8.6        35       911        91
SWIR   2025250     60200   15.9500  146.4700       8.3        33       912        93
SWIR   2025250     60200   16.0100  146.3800       5.5        24       908        81
SWIR   2025250     60200   15.9000  149.1900       8.7        54       965        68
SWIR   2025250     60200   15.8800  149.1100       7.5        52       936        81
SWIR   2025250     60200   15.8800  149.0500       6.2        52       924        87
SWIR   2025250     60200   15.9000  148.9300       5.2        49       927        88
SWIR   2025250     60200   15.9000  147.4900       5.5        43       959        64
SWIR   2025250     60200   15.8800  147.4300       4.9        26       950        78
SWIR   2025250     60200   15.9000  147.3200       5.0        11       917        69
SWIR   2025250     60200   15.8600  147.2200       5.4        15       899        81
SWIR   2025250     60200   15.9000  147.1700       4.8        18       902        84
SWIR   2025250     60200   15.9400  146.9200       4.2       356       927        89
SWIR   2025250     60200   15.9300  146.6100       7.8        43       906        70
SWIR   2025250     60200   15.9300  146.4500       8.0        31       912        95
SWIR   2025250     60200   15.9300  146.2400       7.8        38       893        66
SWIR   2025250     60200   15.8700  146.1200       7.8        32       791        84
SWIR   2025250     60200   15.8000  149.1600       6.2        41       952        84
SWIR   2025250     60200   15.7800  149.1400       5.0        38       954        92
SWIR   2025250     60200   15.8600  148.9500       4.8        49       941        92
SWIR   2025250     60200   15.8200  148.8500       6.3        42       979        96
SWIR   2025250     60200   15.8100  147.4100       5.1        21       906        76
SWIR   2025250     60200   15.8200  147.2400       5.2        11       897        68
SWIR   2025250     60200   15.7800  147.1600       5.5        20       924        87
SWIR   2025250     60200   15.7800  146.9800       5.4        27       966        61
SWIR   2025250     60200   15.8400  146.8700       4.0        25       930        84
SWIR   2025250     60200   15.8400  146.4900       6.4        28       919        81
SWIR   2025250     60200   15.8200  146.3500       6.5        34       904        66
SWIR   2025250     60200   15.8300  146.1600       6.6        31       795        63
SWIR   2025250     60200   15.7600  149.1200       4.4        38       953        93
SWIR   2025250     60200   15.7600  148.6300       5.0        55       967        81
SWIR   2025250     60200   15.7400  148.5900       4.8        59       969        77
SWIR   2025250     60200   15.7100  147.2900       6.1        12       903        88
SWIR   2025250     60200   15.7500  147.2100       5.3         8       908        77
SWIR   2025250     60200   15.7100  147.0800       6.7        28       940        95
SWIR   2025250     60200   15.6700  147.0500       6.7        29       921        80
SWIR   2025250     60200   15.6700  146.8600       6.4        32       939        87
SWIR   2025250     60200   15.6600  146.5700       5.2        18       935        91
SWIR   2025250     60200   15.5800  147.9000       9.4        45       947        98
SWIR   2025250     60200   15.5800  147.8400       7.9        45       940        97
SWIR   2025250     60200   15.5700  147.4200       6.2        29       895        81
SWIR   2025250     60200   15.5700  147.4000       5.9        23       896        80
SWIR   2025250     60200   15.6300  147.1100       4.8        11       901        67
SWIR   2025250     60200   15.6300  147.0100       7.4        31       912        78
SWIR   2025250     60200   15.6500  146.9200       8.9        38       934        91
SWIR   2025250     60200   15.6200  146.6100       5.9        19       935        89
SWIR   2025250     60200   15.6200  146.4500       4.1        16       953        81
SWIR   2025250     60200   15.6200  146.4400       4.6        22       950        83
SWIR   2025250     60200   15.5600  147.9400       9.6        42       954        92
SWIR   2025250     60200   15.5400  147.8600       8.0        46       950        94
SWIR   2025250     60200   15.5600  147.7600       7.0        46       909        91
SWIR   2025250     60200   15.5600  147.6700       6.2        47       896        61
SWIR   2025250     60200   15.5500  147.4300       6.3        33       884        76
SWIR   2025250     60200   15.5500  147.2800       5.3        18       884        68
SWIR   2025250     60200   15.5500  147.2200       4.2        10       889        62
SWIR   2025250     60200   15.5500  147.0700       5.3        22       901        76
SWIR   2025250     60200   15.5100  146.9700       8.3        41       903        79
SWIR   2025250     60200   15.5500  146.9100       8.9        41       908        68
SWIR   2025250     60200   15.4400  148.0500       6.5        38       978        77
SWIR   2025250     60200   15.4600  147.7200       6.7        48       889        66
SWIR   2025250     60200   15.3800  147.6600       6.7        44       877        73
SWIR   2025250     60200   15.4600  147.4100       4.4        20       870        66
SWIR   2025250     60200   15.4600  147.1800       5.0        22       888        62
SWIR   2025250     60200   15.3800  147.0800       8.6        51       898        69
SWIR   2025250     60200   15.4000  147.0400       9.0        53       903        88
SWIR   2025250     60200   15.4000  146.9000       7.3        39       904        83
SWIR   2025250     60200   15.3800  146.7900       5.9        15       910        67
SWIR   2025250     60200   15.3300  147.7700       6.4        41       891        68
SWIR   2025250     60200   15.2900  147.7500       7.0        39       886        64
SWIR   2025250     60200   15.3100  147.6500       7.5        41       875        73
SWIR   2025250     60200   15.3600  147.0700       8.7        50       897        70
SWIR   2025250     60200   15.3600  147.0600       9.1        54       898        79
SWIR   2025250     60200   15.3400  146.9600       8.3        52       900        74
SWIR   2025250     60200   15.2800  146.7800       7.4        37       905        66
SWIR   2025250     60200   15.2800  146.7600       7.6        39       908        68
SWIR   2025250     60200   15.2000  148.2000       5.9        36       962        63
SWIR   2025250     60200   15.2000  148.1700       5.7        36       964        64
SWIR   2025250     60200   15.2700  147.5500       6.9        48       783        93
SWIR   2025250     60200   15.2600  146.7800       7.6        38       901        64
SWIR   2025250     60200   15.2200  146.6100       6.5        32       910        63
SWIR   2025250     60200   15.2600  146.5100       4.3       359       910        61
SWIR   2025250     60200   15.2600  146.4700       4.2       349       908        60
SWIR   2025250     60200   15.1000  148.3500       5.2        26       954        71
SWIR   2025250     60200   15.1000  148.3100       5.3        26       957        80
SWIR   2025250     60200   15.1400  148.2200       5.5        31       960        71
SWIR   2025250     60200   15.1000  148.0000       6.2        33       943        98
SWIR   2025250     60200   15.1100  146.7900       5.1        29       893        66
SWIR   2025250     60200   15.1600  146.7800       6.6        37       895        60
SWIR   2025250     60200   15.1600  146.6400       7.4        39       902        63
SWIR   2025250     60200   15.0300  149.4000       4.5        64       971        72
SWIR   2025250     60200   15.0100  149.3000       4.5        58       973        66
SWIR   2025250     60200   15.0200  148.4100       4.8        24       943        96
SWIR   2025250     60200   15.0200  148.3500       4.8        21       938        97
SWIR   2025250     60200   15.0600  148.2200       5.8        29       953        80
SWIR   2025250     60200   15.0800  148.1200       6.0        35       955        91
SWIR   2025250     60200   15.0200  148.0600       6.7        34       945        95
SWIR   2025250     60200   15.0800  147.9800       6.4        33       943        98
SWIR   2025250     60200   15.0800  147.7500       8.3        48       961        92
SWIR   2025250     60200   15.0200  147.6100       4.8        37       899        96
SWIR   2025250     60200   15.0700  147.5000       5.2        36       777        65
SWIR   2025250     60200   14.9900  147.0500       4.5        31       883        63
SWIR   2025250     60200   15.0000  149.3200       4.9        55       970        68
SWIR   2025250     60200   14.9700  148.4000       4.1        25       864        96
SWIR   2025250     60200   14.9900  148.3100       4.3        23       933        93
SWIR   2025250     60200   14.9600  148.1300       6.3        29       940        90
SWIR   2025250     60200   14.9500  148.0500       6.7        27       918        93
SWIR   2025250     60200   14.9300  147.9900       6.3        29       879        98
SWIR   2025250     60200   14.9000  147.6100       4.0        11       801        77
SWIR   2025250     60200   14.9000  147.1600       4.9        42       888        83
SWIR   2025250     60200   14.9200  147.0900       5.3        41       885        65
SWIR   2025250     60200   14.9500  146.5900       4.0        26       904        65
SWIR   2025250     60200   14.9300  146.5300       4.2        29       906        70
SWIR   2025250     60200   14.9100  146.4200       5.1        33       911        79
SWIR   2025250     60200   14.8100  148.3500       4.0        35       838        93
SWIR   2025250     60200   14.8500  148.2400       4.2        29       840        90
SWIR   2025250     60200   14.8500  148.2000       4.5        26       844        97
SWIR   2025250     60200   14.8100  148.0300       4.5        53       837        90
SWIR   2025250     60200   14.8800  147.6400       5.1        25       821        87
SWIR   2025250     60200   14.8800  147.6100       4.6        21       805        83
SWIR   2025250     60200   14.8000  146.9700       5.1        42       886        67
SWIR   2025250     60200   14.8600  146.4900       4.1        47       911        76
SWIR   2025250     60200   14.8600  146.4700       4.4        45       909        82
SWIR   2025250     60200   14.7400  149.0900       4.2        37       970        72
SWIR   2025250     60200   14.7400  148.4500       4.1        32       906        95
SWIR   2025250     60200   14.7900  148.2400       4.2        27       833        92
SWIR   2025250     60200   14.7300  147.8300       4.0        20       793        86
SWIR   2025250     60200   14.7900  147.5400       5.3        36       819        66
SWIR   2025250     60200   14.7000  148.4400       4.1        30       906        87
SWIR   2025250     60200   14.7000  148.4200       4.4        32       899        80
SWIR   2025250     60200   14.7000  148.3100       5.0        37       887        92
SWIR   2025250     60200   14.5800  148.0500       4.8        43       826        89
SWIR   2025250     60200   14.6000  147.9900       4.8        34       836        92
SWIR   2025250     60200   14.5600  147.8900       5.3        17       799        80
SWIR   2025250     60200   14.4800  141.2800       5.3       199       931        86
SWIR   2025250     60200   14.3900  141.3200       5.5       196       945        70
SWIR   2025250     60200   14.3700  148.0200       4.8        37       806        90
SWIR   2025250     60200   14.3000  141.9900       4.1       224       921        81
SWIR   2025250     60200   14.3000  141.9700       4.1       225       917        80
SWIR   2025250     60200   14.3100  141.7500       5.3       216       798        64
SWIR   2025250     60200   14.2400  148.1600       4.9        29       796        72
SWIR   2025250     60200   14.2400  148.1300       5.5        34       798        76
SWIR   2025250     60200   14.2600  147.9700       4.8        36       801        62
SWIR   2025250     60200   14.2400  147.8900       4.5        31       792        67
SWIR   2025250     60200   14.2000  142.0100       5.2       216       862        70
SWIR   2025250     60200   14.2600  141.9500       5.0       223       898        76
SWIR   2025250     60200   14.2000  141.8600       6.2       213       837        65
SWIR   2025250     60200   14.2200  148.1100       5.7        37       798        75
SWIR   2025250     60200   14.1800  148.0100       5.3        36       801        75
SWIR   2025250     60200   14.2000  147.9100       4.6        33       799        65
SWIR   2025250     60200   14.1800  142.0300       5.0       213       846        66
SWIR   2025250     60200   14.0600  149.1000       5.8        39       960        94
SWIR   2025250     60200   14.0700  148.9800       6.9        34       957        85
SWIR   2025250     60200   14.1300  148.9500       4.5        37       959        68
SWIR   2025250     60200   14.0700  148.6700       4.2        35       931        84
SWIR   2025250     60200   14.1100  148.6400       4.3        32       917        77
SWIR   2025250     60200   14.0500  148.5400       5.6        34       851        91
SWIR   2025250     60200   14.0700  148.4200       4.9        24       792        77
SWIR   2025250     60200   14.0900  148.3700       4.4        12       787        78
SWIR   2025250     60200   14.0900  148.1700       4.1        51       791        60
SWIR   2025250     60200   14.1000  148.0400       5.8        37       804        74
SWIR   2025250     60200   14.0800  147.9100       4.6        30       824        91
SWIR   2025250     60200   14.1200  147.8700       4.2        30       809        90
SWIR   2025250     60200   14.0300  142.2300       4.7       224       859        67
SWIR   2025250     60200   14.0100  142.1000       4.4       201       829        68
SWIR   2025250     60200   13.9800  149.3100       5.0        95       922        83
SWIR   2025250     60200   13.9800  149.2100       5.8        86       929        68
SWIR   2025250     60200   14.0400  149.0800       7.7        38       960        94
SWIR   2025250     60200   14.0000  148.8400       4.1        28       933        80
SWIR   2025250     60200   13.9600  148.7400       4.3        32       926        90
SWIR   2025250     60200   13.9700  148.6100       5.7        33       911        89
SWIR   2025250     60200   14.0300  148.5400       6.0        33       867        89
SWIR   2025250     60200   13.9900  148.4600       5.4        16       796        78
SWIR   2025250     60200   13.9500  147.9900       4.8        18       822        69
SWIR   2025250     60200   13.9500  147.9000       4.9        30       852        87
SWIR   2025250     60200   14.0300  147.8100       4.2        29       840        96
SWIR   2025250     60200   14.0200  147.7700       4.0        30       833        95
SWIR   2025250     60200   13.9200  142.2400       6.2       210       840        79
SWIR   2025250     60200   13.9200  142.1900       5.5       204       827        66
SWIR   2025250     60200   13.9200  148.7600       4.6        30       926        87
SWIR   2025250     60200   13.9200  148.4500       4.0         2       795        66
SWIR   2025250     60200   13.8600  148.2000       4.0        20       805        74
SWIR   2025250     60200   13.8700  147.9900       4.8        31       821        97
SWIR   2025250     60200   13.8900  147.9500       4.6        30       835        85
SWIR   2025250     60200   13.9300  147.8400       4.9        39       861        72
SWIR   2025250     60200   13.8500  144.3100       4.3       297       881        77
SWIR   2025250     60200   13.8800  142.3600       5.8       223       815        88
SWIR   2025250     60200   13.8400  142.3000       6.1       217       796        78
SWIR   2025250     60200   13.8400  142.2400       5.7       212       802        61
SWIR   2025250     60200   13.8400  148.1600       4.6        25       807        84
SWIR   2025250     60200   13.8400  148.0400       4.8        24       809        99
SWIR   2025250     60200   13.8400  147.9500       4.9        44       818        90
SWIR   2025250     60200   13.7900  144.3500       4.3       299       886        74
SWIR   2025250     60200   13.8000  142.4100       4.9       209       797        88
SWIR   2025250     60200   13.7600  142.2800       5.2       211       784        80
SWIR   2025250     60200   13.7200  148.1000       4.9        37       799        71
SWIR   2025250     60200   13.6800  147.9800       5.2        44       792        92
SWIR   2025250     60200   13.6300  142.5900       4.6       227       862        64
SWIR   2025250     60200   13.6500  142.5800       4.6       227       872        62
SWIR   2025250     60200   13.5600  142.6700       4.4       220       865        64
SWIR   2025250     60200   13.5500  147.8400       4.2        19       917        92
SWIR   2025250     60200   13.5200  142.7600       5.6       218       911        89
SWIR   2025250     60200   13.5200  142.7400       5.6       218       906        92
SWIR   2025250     60200   13.1900  148.0800       4.1        25       943        95
SWIR   2025250     60200   13.2000  143.1100       4.0       234       868        66
SWIR   2025250     60200   13.1800  143.0100       4.3       229       866        73
SWIR   2025250     60200   13.1500  148.0800       4.1        25       947       100
SWIR   2025250     60200   13.1400  143.1200       4.1       233       879        71
SWIR   2025250     60200   13.1200  143.0100       4.3       230       863        72
SWIR   2025250     60200   12.7100  147.4300       4.4        32       815        62
SWIR   2025250     60200   12.7700  147.3800       4.6        43       861        67
WVCT   2025250     60200   19.6500  143.2800       4.7       137       326        67
WVCT   2025250     60200   19.6700  142.8300       5.4       135       278        66
WVCT   2025250     60200   19.6500  142.7300       5.2       138       261        86
WVCT   2025250     60200   19.6500  142.6900       5.2       141       275        93
WVCT   2025250     60200   19.7100  142.5200       4.2       143       336        76
WVCT   2025250     60200   19.7300  142.5000       4.1       141       336        71
WVCT   2025250     60200   19.7100  142.2100       4.9       152       280        82
WVCT   2025250     60200   19.5900  143.3500       5.9       145       286        63
WVCT   2025250     60200   19.5900  143.3100       5.6       141       282        65
WVCT   2025250     60200   19.5900  143.1400       6.2       135       259        71
WVCT   2025250     60200   19.6100  143.1000       5.7       140       255        69
WVCT   2025250     60200   19.5700  143.0200       6.0       132       245        97
WVCT   2025250     60200   19.5900  142.9000       4.9       138       263        78
WVCT   2025250     60200   19.5900  142.7300       5.2       137       276        71
WVCT   2025250     60200   19.6300  142.6300       5.3       144       330        60
WVCT   2025250     60200   19.5900  142.2200       6.9       137       280        82
WVCT   2025250     60200   19.5900  142.1200       8.3       134       333        74
WVCT   2025250     60200   19.4700  143.2100       8.4       133       257        71
WVCT   2025250     60200   19.4500  143.1500       9.8       134       259        65
WVCT   2025250     60200   19.5100  143.0200       7.3       131       252        75
WVCT   2025250     60200   19.5100  143.0000       7.2       130       259        74
WVCT   2025250     60200   19.3600  143.6100       7.8       134       251        62
WVCT   2025250     60200   19.3600  143.5500       7.7       138       241        85
WVCT   2025250     60200   19.4400  143.5000       6.6       138       250        61
WVCT   2025250     60200   19.3700  143.3600       6.8       132       252        69
WVCT   2025250     60200   19.3700  143.2400       8.4       131       267        69
WVCT   2025250     60200   19.2600  143.6500       7.9       133       240        86
WVCT   2025250     60200   19.3400  143.5700       8.0       136       240        84
WVCT   2025250     60200   19.3400  143.5100       7.5       138       237        73
WVCT   2025250     60200   19.3100  142.9700       5.0       133       327        63
WVCT   2025250     60200   19.1600  143.8400       5.9       124       263        68
WVCT   2025250     60200   19.1800  143.6800       6.7       131       247        93
WVCT   2025250     60200   19.2200  143.6300       7.3       132       240        82
WVCT   2025250     60200   19.2200  143.5700       6.8       132       244        67
WVCT   2025250     60200   19.0800  144.3200       6.9       123       290        77
WVCT   2025250     60200   19.0800  144.2600       6.0       116       297        81
WVCT   2025250     60200   19.1000  144.1900       4.7       104       340        64
WVCT   2025250     60200   19.0600  143.9100       6.4       122       247        93
WVCT   2025250     60200   19.0800  143.8900       6.3       121       249        91
WVCT   2025250     60200   19.1400  143.7000       5.6       128       249        75
WVCT   2025250     60200   19.0800  143.4200       5.2       122       302        68
WVCT   2025250     60200   19.1000  143.4100       5.2       118       302        63
WVCT   2025250     60200   18.9700  144.5300       9.3       140       330        64
WVCT   2025250     60200   19.0000  144.3600       7.1       126       273        87
WVCT   2025250     60200   19.0400  144.2400       5.9       110       282        93
WVCT   2025250     60200   18.9600  144.2200       6.3       111       266        98
WVCT   2025250     60200   18.9600  144.0600       5.5       111       266        78
WVCT   2025250     60200   18.9800  143.9800       6.0       124       250        94
WVCT   2025250     60200   19.0400  143.9300       6.4       122       247        91
WVCT   2025250     60200   18.9600  143.8100       4.9       117       265        64
WVCT   2025250     60200   18.9800  143.5900       4.3       116       309        69
WVCT   2025250     60200   19.0200  143.4800       5.4       121       308        89
WVCT   2025250     60200   18.9800  143.4000       9.1       133       326        87
WVCT   2025250     60200   18.8900  144.7000       9.4       139       340        67
WVCT   2025250     60200   18.8700  144.5800       8.7       134       312        60
WVCT   2025250     60200   18.8700  144.3900       7.5       115       239        83
WVCT   2025250     60200   18.9200  144.2900       6.8       116       252        91
WVCT   2025250     60200   18.9400  144.2400       6.5       112       259        98
WVCT   2025250     60200   18.9400  144.0800       5.5       107       267        95
WVCT   2025250     60200   18.9000  144.0000       6.0       117       257        83
WVCT   2025250     60200   18.9400  143.9600       5.8       123       247        82
WVCT   2025250     60200   18.8100  144.7000       7.1       129       304        75
WVCT   2025250     60200   18.8300  144.6800       7.8       132       304        71
WVCT   2025250     60200   18.7700  144.5800       6.2       107       260        84
WVCT   2025250     60200   18.7900  144.4600       7.4       113       230        84
WVCT   2025250     60200   18.8300  144.3700       7.4       111       234        87
WVCT   2025250     60200   18.8500  144.2300       6.9       116       253        84
WVCT   2025250     60200   18.8400  144.1500       5.9       114       270        60
WVCT   2025250     60200   18.8400  143.9000       6.1       111       282        63
WVCT   2025250     60200   18.6900  144.8600       7.0       125       315        75
WVCT   2025250     60200   18.6900  144.7700       5.6       112       295        85
WVCT   2025250     60200   18.6900  144.6700       5.1        85       271        76
WVCT   2025250     60200   18.7100  144.5200       6.0        95       230        87
WVCT   2025250     60200   18.6900  144.4400       6.8       108       229        96
WVCT   2025250     60200   18.7100  144.4000       7.5       112       229        92
WVCT   2025250     60200   18.7500  144.3000       8.0       119       240        83
WVCT   2025250     60200   18.6300  144.9000       7.4       127       317        70
WVCT   2025250     60200   18.5900  144.8400       7.2       125       274        79
WVCT   2025250     60200   18.6300  144.7100       5.1        76       259        89
WVCT   2025250     60200   18.6100  144.6900       5.4        80       240        85
WVCT   2025250     60200   18.5700  144.5900       6.1        88       229        93
WVCT   2025250     60200   18.6300  144.4700       6.1        97       230        97
WVCT   2025250     60200   18.6300  144.3900       7.2       117       234        81
WVCT   2025250     60200   18.6300  144.3000       8.6       125       252        65
WVCT   2025250     60200   18.5700  143.8500       9.6       120       339        78
WVCT   2025250     60200   18.6000  143.7300       7.5       106       343        60
WVCT   2025250     60200   18.6000  143.3400      11.0       122       327        63
WVCT   2025250     60200   18.5600  143.2700      13.1       128       336        83
WVCT   2025250     60200   18.5600  142.1400       9.2       120       343        65
WVCT   2025250     60200   18.5600  142.0100      10.5       114       340        71
WVCT   2025250     60200   18.4800  144.9100       5.7       110       285        66
WVCT   2025250     60200   18.4900  144.8500       6.1       112       264        71
WVCT   2025250     60200   18.4900  144.7200       6.8       110       222        94
WVCT   2025250     60200   18.5100  144.6000       6.8       100       222        94
WVCT   2025250     60200   18.5300  144.5100       6.4       104       234        88
WVCT   2025250     60200   18.4700  143.9000       9.3       119       329        89
WVCT   2025250     60200   18.5500  143.8500       9.9       120       336        85
WVCT   2025250     60200   18.5100  143.7100       8.5       101       305        90
WVCT   2025250     60200   18.5100  143.6500       8.2        88       299        89
WVCT   2025250     60200   18.5200  143.5000       7.7       102       300        92
WVCT   2025250     60200   18.5400  143.4400       8.8       110       307        84
WVCT   2025250     60200   18.5000  143.2800      13.6       126       319        82
WVCT   2025250     60200   18.5400  143.2600      13.2       127       331        85
WVCT   2025250     60200   18.4600  142.9100      11.4       111       304        68
WVCT   2025250     60200   18.5000  142.8400      10.2       116       303        77
WVCT   2025250     60200   18.5200  142.7400       7.1       114       305        79
WVCT   2025250     60200   18.4800  142.6200       4.9       123       288        73
WVCT   2025250     60200   18.4800  142.3100       5.4       158       301        64
WVCT   2025250     60200   18.4600  142.1200      12.8       112       310        91
WVCT   2025250     60200   18.4800  142.0800      12.2       115       310        96
WVCT   2025250     60200   18.5000  142.0100      10.0       121       323        69
WVCT   2025250     60200   18.5000  141.8300       6.3       128       340        83
WVCT   2025250     60200   18.5000  141.8100       5.8       130       346        84
WVCT   2025250     60200   18.4500  140.8300       6.0       147       334        60
WVCT   2025250     60200   18.3800  144.9600       6.0       105       317        65
WVCT   2025250     60200   18.4400  144.8700       5.5        91       264        77
WVCT   2025250     60200   18.3800  144.7700       7.0       114       230        90
WVCT   2025250     60200   18.4000  144.7300       7.9       119       223        87
WVCT   2025250     60200   18.4300  144.6000       7.4       108       224        90
WVCT   2025250     60200   18.3700  144.5600       6.8       109       246        77
WVCT   2025250     60200   18.3700  143.9900       9.7       132       322        72
WVCT   2025250     60200   18.4500  143.9000       9.2       118       321        90
WVCT   2025250     60200   18.4500  143.8800       9.0       117       316        90
WVCT   2025250     60200   18.3700  143.7000       9.1       106       281        80
WVCT   2025250     60200   18.4500  143.6100       8.5        90       283        89
WVCT   2025250     60200   18.4100  143.5700       9.1       101       278        83
WVCT   2025250     60200   18.3700  143.4900      12.5       124       289        78
WVCT   2025250     60200   18.4400  143.4000      12.5       123       297        84
WVCT   2025250     60200   18.3700  143.2400      11.0       116       309        62
WVCT   2025250     60200   18.4000  143.0300      12.1       110       302        70
WVCT   2025250     60200   18.4200  143.0100      11.5       111       309        68
WVCT   2025250     60200   18.3600  142.9100      12.6       111       274        92
WVCT   2025250     60200   18.3600  142.7900       9.1       118       263        94
WVCT   2025250     60200   18.3800  142.6800       8.8       136       257        81
WVCT   2025250     60200   18.4400  142.6000       6.2       135       273        78
WVCT   2025250     60200   18.3600  142.3100       8.9       144       271        88
WVCT   2025250     60200   18.3600  142.1800      12.5       117       289        99
WVCT   2025250     60200   18.4400  142.0600      13.9       111       310        92
WVCT   2025250     60200   18.3800  141.9600       9.1       129       332        63
WVCT   2025250     60200   18.4400  141.9500       9.3       125       327        76
WVCT   2025250     60200   18.3500  140.8300       5.8       154       304        61
WVCT   2025250     60200   18.3700  140.6400       6.7       156       302        64
WVCT   2025250     60200   18.2800  145.0000       6.5       116       317        61
WVCT   2025250     60200   18.3600  144.9600       5.9       103       317        65
WVCT   2025250     60200   18.3400  144.8100       6.2       100       235        98
WVCT   2025250     60200   18.3400  144.7900       6.7       108       231        98
WVCT   2025250     60200   18.3600  144.6900       8.2       117       227        90
WVCT   2025250     60200   18.3500  144.5000       5.7       110       283        60
WVCT   2025250     60200   18.3500  144.0300       9.1       129       333        61
WVCT   2025250     60200   18.3500  144.0100       9.3       131       323        67
WVCT   2025250     60200   18.2900  143.8900       6.6       121       288        78
WVCT   2025250     60200   18.3100  143.7400       9.1       108       287        68
WVCT   2025250     60200   18.3300  143.7200       9.3       107       285        72
WVCT   2025250     60200   18.3100  143.5400      12.2       120       289        89
WVCT   2025250     60200   18.3300  143.5300      12.2       122       288        87
WVCT   2025250     60200   18.3500  143.3700      13.1       124       313        87
WVCT   2025250     60200   18.3100  143.1600      10.9       113       282        75
WVCT   2025250     60200   18.3300  143.1200      11.6       110       282        84
WVCT   2025250     60200   18.3000  142.9800      12.8       113       264        92
WVCT   2025250     60200   18.3000  142.8900      11.6       118       256        78
WVCT   2025250     60200   18.3400  142.8100       9.5       120       261        88
WVCT   2025250     60200   18.2600  142.7500       9.1       138       246        72
WVCT   2025250     60200   18.2800  142.6200       9.7       144       241        75
WVCT   2025250     60200   18.2600  142.4800       8.3       141       247        83
WVCT   2025250     60200   18.2600  142.4600       8.2       140       249        83
WVCT   2025250     60200   18.2600  142.3300       8.3       138       261        67
WVCT   2025250     60200   18.3200  142.2100      10.8       123       276        96
WVCT   2025250     60200   18.2600  142.1700      10.0       121       279        85
WVCT   2025250     60200   18.2900  140.9400       7.4       156       342        63
WVCT   2025250     60200   18.3300  140.8500       6.1       157       307        62
WVCT   2025250     60200   18.3300  140.8100       6.2       154       304        60
WVCT   2025250     60200   18.3300  140.6700       7.6       147       302        62
WVCT   2025250     60200   18.2000  144.9500       5.7       112       285        76
WVCT   2025250     60200   18.2000  144.9300       6.0       115       273        80
WVCT   2025250     60200   18.1800  144.8200       7.8       114       245        62
WVCT   2025250     60200   18.2300  144.0800       6.2       122       335        68
WVCT   2025250     60200   18.2500  144.0600       6.5       128       328        71
WVCT   2025250     60200   18.1900  143.9600       6.1       128       284        68
WVCT   2025250     60200   18.1700  143.8100       9.2       115       283        79
WVCT   2025250     60200   18.1700  143.7300      11.8       115       285        91
WVCT   2025250     60200   18.2100  143.6400      12.9       118       285        90
WVCT   2025250     60200   18.2500  143.5600      12.2       122       301        90
WVCT   2025250     60200   18.1700  143.4600       9.5       117       311        63
WVCT   2025250     60200   18.1700  143.3100      10.8       125       273        64
WVCT   2025250     60200   18.1900  143.2900      10.9       124       276        63
WVCT   2025250     60200   18.2300  143.1700      10.6       115       264        92
WVCT   2025250     60200   18.1900  143.0200      13.4       115       243        88
WVCT   2025250     60200   18.2300  142.9200      12.3       121       247        69
WVCT   2025250     60200   18.2100  142.8300      10.2       135       244        61
WVCT   2025250     60200   18.2000  142.7300       9.0       142       237        65
WVCT   2025250     60200   18.1700  142.7100       8.5       143       232        76
WVCT   2025250     60200   18.1600  142.5300       7.4       145       230        75
WVCT   2025250     60200   18.1600  142.4800       7.7       143       229        71
WVCT   2025250     60200   18.2200  142.4200       7.8       139       243        75
WVCT   2025250     60200   18.1800  142.2500       6.9       135       249        73
WVCT   2025250     60200   18.1600  142.1500       6.3       130       262        69
WVCT   2025250     60200   18.1600  142.1300       6.1       129       263        66
WVCT   2025250     60200   18.2400  140.8000       7.8       168       310        66
WVCT   2025250     60200   18.2300  140.6500       9.5       141       343        74
WVCT   2025250     60200   18.1200  145.0300       6.3        75       317        81
WVCT   2025250     60200   18.1200  144.8500       7.7       116       251        63
WVCT   2025250     60200   18.0800  144.1100       6.3        85       313        79
WVCT   2025250     60200   18.0800  144.0400       7.7        88       289        95
WVCT   2025250     60200   18.0900  143.9800       6.9        98       278        93
WVCT   2025250     60200   18.1500  143.8100       9.5       114       283        81
WVCT   2025250     60200   18.1100  143.7300      11.8       116       289        91
WVCT   2025250     60200   18.1300  143.6900      11.9       116       291        91
WVCT   2025250     60200   18.0700  143.4200       8.3       122       261        76
WVCT   2025250     60200   18.1100  143.3600       9.5       125       264        85
WVCT   2025250     60200   18.1300  143.2900      10.8       126       254        82
WVCT   2025250     60200   18.0700  143.1500      11.0       123       233        77
WVCT   2025250     60200   18.1300  143.0300      13.2       118       235        86
WVCT   2025250     60200   18.0700  142.9500      12.0       128       228        79
WVCT   2025250     60200   18.0900  142.9000      11.5       130       228        75
WVCT   2025250     60200   18.1300  142.8000      10.3       140       230        70
WVCT   2025250     60200   18.0900  142.6900       7.7       141       231        86
WVCT   2025250     60200   18.1500  142.6100       7.5       145       229        70
WVCT   2025250     60200   18.1200  142.4900       7.0       142       229        69
WVCT   2025250     60200   18.1400  142.4200       7.4       141       227        72
WVCT   2025250     60200   18.1000  142.3000       7.4       138       234        70
WVCT   2025250     60200   18.0800  142.2200       7.1       136       239        90
WVCT   2025250     60200   18.1000  142.1500       6.7       131       250        88
WVCT   2025250     60200   18.0600  142.0300       6.4       127       236        74
WVCT   2025250     60200   18.0600  141.9500       5.5       122       240        67
WVCT   2025250     60200   18.1000  141.1500      10.4       141       335        84
WVCT   2025250     60200   18.1400  141.0500       6.4       144       316        67
WVCT   2025250     60200   18.0600  140.9000       5.3       169       305        75
WVCT   2025250     60200   17.9800  145.0800       9.6        53       330        81
WVCT   2025250     60200   18.0200  144.9600       7.4        74       309       100
WVCT   2025250     60200   18.0200  144.8900       6.5       101       281        61
WVCT   2025250     60200   18.0000  144.1500       7.7        75       300        83
WVCT   2025250     60200   17.9800  144.1100       8.4        75       292        89
WVCT   2025250     60200   18.0600  144.0400       8.3        85       288        97
WVCT   2025250     60200   18.0000  143.8800      11.6       104       277        85
WVCT   2025250     60200   18.0000  143.8400      10.8       108       282        75
WVCT   2025250     60200   17.9700  143.6600       7.6       118       280        65
WVCT   2025250     60200   17.9700  143.6500       7.1       118       271        65
WVCT   2025250     60200   18.0500  143.4200       8.1       120       256        76
WVCT   2025250     60200   18.0500  143.2800       9.7       126       239        69
WVCT   2025250     60200   18.0300  143.1800       9.6       122       231        81
WVCT   2025250     60200   18.0300  143.0900      11.2       126       228        85
WVCT   2025250     60200   18.0300  143.0500      11.9       126       227        84
WVCT   2025250     60200   18.0500  142.9700      11.9       129       227        79
WVCT   2025250     60200   18.0100  142.8400       8.2       137       228        77
WVCT   2025250     60200   18.0500  142.7000       7.7       140       231        85
WVCT   2025250     60200   18.0100  142.6800       6.1       133       235        80
WVCT   2025250     60200   18.0500  142.5500       5.4       135       234        71
WVCT   2025250     60200   18.0300  142.2800       7.0       131       244        64
WVCT   2025250     60200   18.0400  142.2000       7.1       132       241        91
WVCT   2025250     60200   18.0000  142.0700       7.5       132       232        89
WVCT   2025250     60200   18.0200  141.9900       6.5       127       228        78
WVCT   2025250     60200   17.9600  141.8300       5.8       123       234        72
WVCT   2025250     60200   17.9600  141.8200       5.7       123       240        69
WVCT   2025250     60200   17.9600  141.7200       4.8       125       259        66
WVCT   2025250     60200   17.9600  141.0700       7.0       178       302        81
WVCT   2025250     60200   18.0200  140.9500       6.4       168       286        79
WVCT   2025250     60200   18.0400  140.8600       5.8       154       314        80
WVCT   2025250     60200   18.0400  140.8400       6.2       151       334        83
WVCT   2025250     60200   17.8900  145.1100       8.1        73       330        79
WVCT   2025250     60200   17.8900  145.0500       8.6        72       323        89
WVCT   2025250     60200   17.8900  144.9000       7.1       128       319        63
WVCT   2025250     60200   17.9600  144.2400       7.2        83       315        70
WVCT   2025250     60200   17.9400  144.2200       8.0        77       309        92
WVCT   2025250     60200   17.9600  144.1100       8.9        72       290        91
WVCT   2025250     60200   17.9200  144.0300       9.7        73       280        88
WVCT   2025250     60200   17.8800  143.7200      10.3       135       259        74
WVCT   2025250     60200   17.9600  143.6600       7.4       122       272        62
WVCT   2025250     60200   17.9400  143.6000       6.2       117       252        71
WVCT   2025250     60200   17.9000  143.4700       6.7       108       239        64
WVCT   2025250     60200   17.9300  143.4100       8.3       118       239        73
WVCT   2025250     60200   17.8700  143.2000       5.9       104       223        65
WVCT   2025250     60200   17.9300  143.1000       6.9       109       224        81
WVCT   2025250     60200   17.9500  143.0300       8.9       122       225        78
WVCT   2025250     60200   17.8700  142.9100       9.2       120       228        72
WVCT   2025250     60200   17.8700  142.1800       7.0       110       259        79
WVCT   2025250     60200   17.9500  142.1200       7.9       127       247        90
WVCT   2025250     60200   17.9100  141.9900       7.6       123       231        90
WVCT   2025250     60200   17.8700  141.9500       6.8       122       242        83
WVCT   2025250     60200   17.8700  141.7900       5.4       119       211        67
WVCT   2025250     60200   17.9400  141.7400       5.1       124       244        70
WVCT   2025250     60200   17.8800  140.9500       8.5       183       299        78
WVCT   2025250     60200   17.8800  140.9300       8.7       182       297        75
WVCT   2025250     60200   17.9000  140.8000       7.8       159       310        76
WVCT   2025250     60200   17.8500  145.0900       8.2        85       330        85
WVCT   2025250     60200   17.7900  145.0700       8.8       110       319        78
WVCT   2025250     60200   17.8100  144.9700       8.8       131       319        81
WVCT   2025250     60200   17.7800  144.2700       7.8        87       308        87
WVCT   2025250     60200   17.8400  144.1800       9.9        62       305        83
WVCT   2025250     60200   17.7800  143.7700      11.6       140       251        85
WVCT   2025250     60200   17.8200  143.7500      11.6       138       254        80
WVCT   2025250     60200   17.7800  143.3900       6.6       103       219        73
WVCT   2025250     60200   17.7800  143.3100       7.1       118       220        63
WVCT   2025250     60200   17.8300  143.1600       6.1        99       223        64
WVCT   2025250     60200   17.7700  143.0000       8.3       110       220        64
WVCT   2025250     60200   17.7900  142.9400       8.7       111       222        66
WVCT   2025250     60200   17.7900  142.6900       6.1       106       215        60
WVCT   2025250     60200   17.8100  142.4200       7.1        88       229        66
WVCT   2025250     60200   17.8500  142.4100       7.0        92       239        60
WVCT   2025250     60200   17.7700  142.3100       5.7        88       234        65
WVCT   2025250     60200   17.8500  142.2000       6.4       104       258        71
WVCT   2025250     60200   17.7900  142.0800       6.4       102       261        72
WVCT   2025250     60200   17.7700  141.9400       5.7       109       267        79
WVCT   2025250     60200   17.7900  141.8500       6.4       118       239        73
WVCT   2025250     60200   17.8300  141.8300       6.2       120       212        73
WVCT   2025250     60200   17.8400  140.8900       8.4       189       307        78
WVCT   2025250     60200   17.7800  140.8300       8.6       181       315        79
WVCT   2025250     60200   17.7600  140.6800       8.1       166       326        71
WVCT   2025250     60200   17.7100  145.1600       9.1       118       339        60
WVCT   2025250     60200   17.7700  145.0700       9.4       117       324        83
WVCT   2025250     60200   17.7700  144.9700      10.1       141       327        77
WVCT   2025250     60200   17.7000  144.3100       7.2        99       283        77
WVCT   2025250     60200   17.7600  144.2700       7.9        81       305        92
WVCT   2025250     60200   17.7400  144.1900      10.0        55       301        89
WVCT   2025250     60200   17.6800  143.8300       8.8       131       241        71
WVCT   2025250     60200   17.7600  143.7900      11.2       141       250        84
WVCT   2025250     60200   17.6800  143.6500       4.2       107       233        61
WVCT   2025250     60200   17.7200  143.3800       5.5        91       218        73
WVCT   2025250     60200   17.6800  143.2500       6.8       110       212        84
WVCT   2025250     60200   17.7000  143.1700       6.9       103       211        71
WVCT   2025250     60200   17.7000  143.1100       8.1       104       206        67
WVCT   2025250     60200   17.7400  143.0400       8.9       108       212        63
WVCT   2025250     60200   17.6800  142.8600      11.1       103       192        67
WVCT   2025250     60200   17.7300  142.8300      10.7       105       201        74
WVCT   2025250     60200   17.6900  142.7100       8.2       105       193        82
WVCT   2025250     60200   17.7500  142.3800       6.9        83       217        70
WVCT   2025250     60200   17.7500  142.2900       5.0        86       230        63
WVCT   2025250     60200   17.7500  142.2700       4.8        86       234        64
WVCT   2025250     60200   17.7500  141.9600       5.5       105       267        76
WVCT   2025250     60200   17.6900  141.8100       6.3       110       269        69
WVCT   2025250     60200   17.6700  141.7500       6.4       109       265        75
WVCT   2025250     60200   17.7500  141.5600       4.9       112       206        67
WVCT   2025250     60200   17.6700  140.7500       8.2       173       318        86
WVCT   2025250     60200   17.7200  140.6800       8.2       167       317        74
WVCT   2025250     60200   17.6700  140.6200       9.3       154       335        91
WVCT   2025250     60200   17.6700  145.0400      10.1       126       318        73
WVCT   2025250     60200   17.6300  144.3400       8.0       131       275        60
WVCT   2025250     60200   17.6500  144.3300       7.3       121       272        75
WVCT   2025250     60200   17.6500  144.2100       7.5        62       277        91
WVCT   2025250     60200   17.5800  143.9600       5.2       127       229        75
WVCT   2025250     60200   17.6600  143.8200       7.7       128       239        74
WVCT   2025250     60200   17.6000  143.3400       6.3       104       209        83
WVCT   2025250     60200   17.6600  143.2500       7.2       111       209        84
WVCT   2025250     60200   17.5800  143.1100       8.4       111       191        71
WVCT   2025250     60200   17.6000  142.9900      10.9       113       185        66
WVCT   2025250     60200   17.6200  142.9000      11.8       107       185        66
WVCT   2025250     60200   17.6600  142.6500       6.0       107       188        82
WVCT   2025250     60200   17.6200  142.4600       4.8        99       187        68
WVCT   2025250     60200   17.5700  141.9000       4.5        84       240        66
WVCT   2025250     60200   17.6100  141.7500       6.4       105       266        82
WVCT   2025250     60200   17.6300  141.7300       6.4       108       265        84
WVCT   2025250     60200   17.5700  141.5500       5.4       110       217        72
WVCT   2025250     60200   17.5900  141.5300       5.4       113       211        68
WVCT   2025250     60200   17.5900  141.4200       4.9       119       211        61
WVCT   2025250     60200   17.5700  141.2500       4.1       144       219        62
WVCT   2025250     60200   17.6300  140.8100       8.7       165       340        80
WVCT   2025250     60200   17.6300  140.7900       8.8       168       339        81
WVCT   2025250     60200   17.6100  140.6500       8.6       164       332        86
WVCT   2025250     60200   17.4900  144.6300       4.2        59       259        74
WVCT   2025250     60200   17.4900  144.3600       6.6        88       262        77
WVCT   2025250     60200   17.4900  144.2400       4.9        70       264        73
WVCT   2025250     60200   17.5700  144.0900       7.2       131       251        63
WVCT   2025250     60200   17.5700  144.0100       6.5       135       232        63
WVCT   2025250     60200   17.4800  143.3400       8.0       121       196        84
WVCT   2025250     60200   17.5000  143.2200       7.8       120       188        88
WVCT   2025250     60200   17.5600  143.1300       8.0       112       188        74
WVCT   2025250     60200   17.4800  143.1000       9.4       113       180        62
WVCT   2025250     60200   17.5400  142.9900      11.9       110       175        63
WVCT   2025250     60200   17.4800  142.8500      13.9       100       165        60
WVCT   2025250     60200   17.5000  142.6100      12.2        93       163        63
WVCT   2025250     60200   17.4800  142.5100      10.1       106       163        65
WVCT   2025250     60200   17.4800  142.3700       5.1       133       169        79
WVCT   2025250     60200   17.4800  141.8200       5.1        75       236        71
WVCT   2025250     60200   17.4900  141.5900       5.6        98       268        80
WVCT   2025250     60200   17.5100  141.5700       5.5       101       260        75
WVCT   2025250     60200   17.5500  141.4200       5.5       114       211        60
WVCT   2025250     60200   17.4700  141.3400       5.0       123       212        66
WVCT   2025250     60200   17.4500  144.6200       5.0        47       251        84
WVCT   2025250     60200   17.4100  144.4700       7.0        59       264        85
WVCT   2025250     60200   17.3900  144.4300       8.4        50       260        69
WVCT   2025250     60200   17.3900  144.2900      10.8        31       251        82
WVCT   2025250     60200   17.3900  144.2400       8.0        44       261        75
WVCT   2025250     60200   17.4700  144.1200       6.0       121       261        84
WVCT   2025250     60200   17.4100  143.7900       8.7        10       229        73
WVCT   2025250     60200   17.3900  143.6200       9.9       153       216        69
WVCT   2025250     60200   17.4500  143.5600       5.6       126       213        67
WVCT   2025250     60200   17.3900  143.4100       9.9       131       196        84
WVCT   2025250     60200   17.3900  143.3500       9.1       131       189        85
WVCT   2025250     60200   17.4400  143.2800       7.3       124       187        82
WVCT   2025250     60200   17.4000  143.1600       8.1       120       174        87
WVCT   2025250     60200   17.3800  143.0600      12.1       118       165        86
WVCT   2025250     60200   17.4200  142.9900      12.8       108       165        65
WVCT   2025250     60200   17.4600  142.8500      13.3       100       163        61
WVCT   2025250     60200   17.4600  142.5700      13.4       100       160        85
WVCT   2025250     60200   17.4600  142.5300      11.8       106       162        74
WVCT   2025250     60200   17.4600  142.3500       5.2       140       169        84
WVCT   2025250     60200   17.4400  142.3200       4.6       150       171        75
WVCT   2025250     60200   17.3800  141.8300       4.1        63       217        83
WVCT   2025250     60200   17.3800  141.7000       4.8        83       242        77
WVCT   2025250     60200   17.4600  141.6500       5.5        91       266        70
WVCT   2025250     60200   17.3800  141.4900       6.1       113       272        84
WVCT   2025250     60200   17.3800  141.4100       6.2       121       274        80
WVCT   2025250     60200   17.4300  141.3400       5.3       122       216        85
WVCT   2025250     60200   17.3900  141.2800       5.1       121       228        73
WVCT   2025250     60200   17.3900  140.6100       9.5       155       334        72
WVCT   2025250     60200   17.3500  144.5800       5.2        46       228        62
WVCT   2025250     60200   17.3700  144.4700       7.2        47       251        80
WVCT   2025250     60200   17.3700  144.4100       9.5        42       256        68
WVCT   2025250     60200   17.3500  144.2700      10.3        32       251        71
WVCT   2025250     60200   17.3700  144.2300       8.3        44       261        79
WVCT   2025250     60200   17.3700  144.1200       6.3       116       257        86
WVCT   2025250     60200   17.3100  144.0000       6.7       103       239        61
WVCT   2025250     60200   17.3700  143.9700       7.3        68       232        65
WVCT   2025250     60200   17.3500  143.6200      11.2       153       213        65
WVCT   2025250     60200   17.3100  143.4800      12.5       147       196        72
WVCT   2025250     60200   17.3500  143.3900      10.3       136       189        84
WVCT   2025250     60200   17.3500  143.2700       6.1       127       176        78
WVCT   2025250     60200   17.3300  143.1400       9.4       121       167        86
WVCT   2025250     60200   17.3300  143.0200      10.7       112       155        82
WVCT   2025250     60200   17.3300  143.0000      10.4       109       153        83
WVCT   2025250     60200   17.2800  142.7300      15.9       108       150        77
WVCT   2025250     60200   17.3000  142.6600      18.3       103       156        70
WVCT   2025250     60200   17.3200  142.6200      20.4       103       158        67
WVCT   2025250     60200   17.2800  142.4800      15.2       140       163        76
WVCT   2025250     60200   17.3000  141.7000       4.4        78       229        78
WVCT   2025250     60200   17.3000  141.6400       4.6        92       241        78
WVCT   2025250     60200   17.3200  141.5300       5.9       110       270        77
WVCT   2025250     60200   17.3600  141.4300       6.2       120       280        81
WVCT   2025250     60200   17.2800  141.3000       4.5       105       288        73
WVCT   2025250     60200   17.3000  141.2600       4.6       107       283        63
WVCT   2025250     60200   17.2800  141.1800       4.7       115       252        76
WVCT   2025250     60200   17.2000  144.4200      11.2        24       246        83
WVCT   2025250     60200   17.2600  144.3300      12.0        26       250        79
WVCT   2025250     60200   17.2200  144.2700       9.2        36       254        78
WVCT   2025250     60200   17.2300  144.0200       9.3       128       243        81
WVCT   2025250     60200   17.1900  143.1900       7.2       119       156        76
WVCT   2025250     60200   17.2700  143.1300       8.8       120       160        83
WVCT   2025250     60200   17.2500  143.0400       8.7       109       137        83
WVCT   2025250     60200   17.1900  142.8600      10.9       107       137        61
WVCT   2025250     60200   17.2300  142.7900      13.0       115       142        86
WVCT   2025250     60200   17.1900  142.6900      12.7       128       142        76
WVCT   2025250     60200   17.1900  142.5700      10.3       148       147        60
WVCT   2025250     60200   17.1900  142.5400      11.0       162       151        80
WVCT   2025250     60200   17.1900  142.4600      13.8       181       160        85
WVCT   2025250     60200   17.2600  142.3100      10.6       153       171        82
WVCT   2025250     60200   17.2600  141.5100       5.5       110       268        66
WVCT   2025250     60200   17.2400  141.3300       5.0       101       292        80
WVCT   2025250     60200   17.2000  141.2400       5.2       110       298        86
WVCT   2025250     60200   17.2200  141.2000       5.1       114       295        82
WVCT   2025250     60200   17.1800  141.1200       5.0       115       294        83
WVCT   2025250     60200   17.1800  140.6800       7.3       200       349        80
WVCT   2025250     60200   17.1800  140.6600       7.2       201       343        73
WVCT   2025250     60200   17.1200  144.8000       7.2       129       348        74
WVCT   2025250     60200   17.1400  144.6700       5.0        90       337        74
WVCT   2025250     60200   17.1600  144.5100       7.1        30       239        60
WVCT   2025250     60200   17.1800  144.4000      11.4        25       249        87
WVCT   2025250     60200   17.1800  144.3800      11.4        25       251        85
WVCT   2025250     60200   17.1000  144.2800      10.0        26       266        81
WVCT   2025250     60200   17.1800  144.0100      10.3       131       242        73
WVCT   2025250     60200   17.1000  143.9500      10.6        58       221        70
WVCT   2025250     60200   17.1200  143.9000      12.2        34       218        90
WVCT   2025250     60200   17.1000  143.7600      11.9         2       212        69
WVCT   2025250     60200   17.1100  143.5300       7.0       108       192        60
WVCT   2025250     60200   17.1300  143.2400       7.2       107       159        76
WVCT   2025250     60200   17.1500  143.2300       7.3       108       157        78
WVCT   2025250     60200   17.1700  142.6700      10.8       134       137        66
WVCT   2025250     60200   17.1700  142.5700       9.0       162       142        71
WVCT   2025250     60200   17.1700  142.5600       8.8       171       142        74
WVCT   2025250     60200   17.0900  142.3600      11.2       201       156        78
WVCT   2025250     60200   17.0900  142.2700       7.6       183       170        70
WVCT   2025250     60200   17.0900  141.9600       7.0       198       189        78
WVCT   2025250     60200   17.0900  141.8800       6.2       195       189        83
WVCT   2025250     60200   17.1400  141.7900       5.0       172       195        76
WVCT   2025250     60200   17.1600  141.3300       5.2        92       288        84
WVCT   2025250     60200   17.1600  141.3100       5.2        95       290        84
WVCT   2025250     60200   17.0800  141.1400       6.1       117       303        73
WVCT   2025250     60200   17.0800  141.1200       6.3       118       302        77
WVCT   2025250     60200   17.1000  140.9700       4.5       140       288        66
WVCT   2025250     60200   17.1200  140.7000       6.6       200       349        84
WVCT   2025250     60200   17.1200  140.6400       6.7       201       342        67
WVCT   2025250     60200   17.0200  144.6000       5.6        67       337        81
WVCT   2025250     60200   17.0000  144.4500       8.4        33       286        74
WVCT   2025250     60200   17.0800  144.3600      10.4        18       273        86
WVCT   2025250     60200   17.0600  144.3400       9.1        18       277        86
WVCT   2025250     60200   17.0400  144.2000       6.7        46       266        65
WVCT   2025250     60200   17.0600  144.1400       6.9        57       263        66
WVCT   2025250     60200   17.0400  143.9700      12.2        41       226        71
WVCT   2025250     60200   17.0000  143.9500      14.5        31       219        73
WVCT   2025250     60200   17.0400  143.7800      16.8         9       211        78
WVCT   2025250     60200   17.0800  143.7000       9.4        26       203        65
WVCT   2025250     60200   17.0600  143.6100       8.5        73       198        71
WVCT   2025250     60200   17.0700  143.5300       7.2        84       191        75
WVCT   2025250     60200   17.0500  143.4100       7.6        44       171        77
WVCT   2025250     60200   17.0500  143.3700       6.5        51       168        78
WVCT   2025250     60200   17.0700  143.2800       6.2       105       160        61
WVCT   2025250     60200   16.9900  143.0100      10.3       109       168        66
WVCT   2025250     60200   17.0100  142.9300      11.0       103       186        78
WVCT   2025250     60200   17.0100  142.8900      10.0        97       190        81
WVCT   2025250     60200   16.9900  142.8000       5.3        73       182        84
WVCT   2025250     60200   17.0300  142.5900       8.9       198       127        81
WVCT   2025250     60200   17.0500  142.4400      12.4       200       135        79
WVCT   2025250     60200   17.0700  142.3400      11.1       198       160        79
WVCT   2025250     60200   17.0100  142.3200      11.7       192       155        76
WVCT   2025250     60200   16.9900  142.1900       8.6       179       177        80
WVCT   2025250     60200   17.0100  142.0500       7.3       183       189        73
WVCT   2025250     60200   17.0700  141.9600       7.3       201       190        80
WVCT   2025250     60200   17.0500  141.9400       7.0       205       190        79
WVCT   2025250     60200   17.0300  141.8400       8.0       195       190        81
WVCT   2025250     60200   17.0100  141.2900       4.7        95       287        69
WVCT   2025250     60200   17.0100  141.2700       4.6        96       291        77
WVCT   2025250     60200   17.0600  141.1200       6.1       115       301        73
WVCT   2025250     60200   17.0200  141.0800       5.9       114       296        75
WVCT   2025250     60200   17.0600  140.9700       5.0       130       294        75
WVCT   2025250     60200   17.0600  140.6600       6.0       199       343        81
WVCT   2025250     60200   17.0200  140.6000       5.9       185       336        78
WVCT   2025250     60200   16.9100  144.8500       5.2        88       333        61
WVCT   2025250     60200   16.9100  144.8300       5.2        81       333        72
WVCT   2025250     60200   16.9100  144.6600       7.2        50       342        75
WVCT   2025250     60200   16.9100  144.6200       7.7        52       341        76
WVCT   2025250     60200   16.9500  144.5400       8.9        50       309        74
WVCT   2025250     60200   16.9800  144.2000       9.4        23       267        73
WVCT   2025250     60200   16.9000  144.1200      13.0        20       260        78
WVCT   2025250     60200   16.9200  143.9800      10.8        29       235        88
WVCT   2025250     60200   16.9800  143.9500      14.9        28       219        78
WVCT   2025250     60200   16.9600  143.8500      21.1        15       211        83
WVCT   2025250     60200   16.9000  143.7300      23.3        11       197        75
WVCT   2025250     60200   16.9000  143.6000      13.1        29       190        83
WVCT   2025250     60200   16.9200  143.5400       9.8        34       185        81
WVCT   2025250     60200   16.9600  143.4300       8.5        18       171        75
WVCT   2025250     60200   16.9600  143.3900       9.0        13       167        84
WVCT   2025250     60200   16.9600  143.0100       8.9       110       183        77
WVCT   2025250     60200   16.9700  142.9100       9.8       100       224        83
WVCT   2025250     60200   16.9300  142.7800       4.5        97       195        68
WVCT   2025250     60200   16.9000  142.7200       7.3       153       176        67
WVCT   2025250     60200   16.9500  142.6200      10.0       183       147        75
WVCT   2025250     60200   16.8900  142.4700      13.7       192       131        79
WVCT   2025250     60200   16.9300  142.3900      13.9       188       143        85
WVCT   2025250     60200   16.9300  142.2600      12.0       183       163        81
WVCT   2025250     60200   16.9100  142.2400      12.1       182       165        83
WVCT   2025250     60200   16.9700  142.0700       7.8       177       186        81
WVCT   2025250     60200   16.9300  142.0500       6.9       180       187        83
WVCT   2025250     60200   16.9700  141.8800       8.1       205       190        83
WVCT   2025250     60200   16.9100  141.7600       9.4       189       194        81
WVCT   2025250     60200   16.9700  141.1900       4.0        86       299        81
WVCT   2025250     60200   16.8200  145.4200       5.8        48       341        75
WVCT   2025250     60200   16.8700  144.8500       5.4        65       329        79
WVCT   2025250     60200   16.8700  144.7900       7.0        48       331        75
WVCT   2025250     60200   16.8100  144.6900       8.9        39       345        63
WVCT   2025250     60200   16.8300  144.5400      12.3        36       309        91
WVCT   2025250     60200   16.8500  144.5000      12.7        37       295        89
WVCT   2025250     60200   16.8800  144.1700      13.5        14       267        74
WVCT   2025250     60200   16.8800  144.1200      13.2        19       260        71
WVCT   2025250     60200   16.8800  143.9400      10.8        32       222        91
WVCT   2025250     60200   16.8000  143.8400      20.2        12       207        83
WVCT   2025250     60200   16.8000  143.7900      21.9         9       198        83
WVCT   2025250     60200   16.8800  143.7300      23.6        10       196        77
WVCT   2025250     60200   16.8600  143.6200      14.5        22       188        83
WVCT   2025250     60200   16.8800  143.5400      11.2        26       182        81
WVCT   2025250     60200   16.8000  143.3600       8.7        22       170        83
WVCT   2025250     60200   16.8800  143.3500       9.3        10       165        78
WVCT   2025250     60200   16.8000  142.7900       8.6       140       180        84
WVCT   2025250     60200   16.8000  142.7700       9.1       146       172        79
WVCT   2025250     60200   16.8400  142.6200      14.5       180       146        79
WVCT   2025250     60200   16.8600  142.5400      15.1       188       133        82
WVCT   2025250     60200   16.8000  142.4100      11.4       193       140        81
WVCT   2025250     60200   16.8200  142.3900      12.5       191       143        83
WVCT   2025250     60200   16.8700  142.2200      12.5       180       169        80
WVCT   2025250     60200   16.8500  142.1800      11.7       176       175        69
WVCT   2025250     60200   16.8700  142.0500       5.3       174       186        69
WVCT   2025250     60200   16.8300  141.7400       8.3       186       197        86
WVCT   2025250     60200   16.8100  141.7200       7.4       184       198        87
WVCT   2025250     60200   16.8300  141.6100       4.7       171       208        86
WVCT   2025250     60200   16.7900  141.2600       5.2        83       275        65
WVCT   2025250     60200   16.7900  141.2400       5.2        85       280        74
WVCT   2025250     60200   16.7900  140.9800       6.8       161       281        62
WVCT   2025250     60200   16.8700  140.6200       8.0       187       326        62
WVCT   2025250     60200   16.7800  145.4400       5.7        46       332        86
WVCT   2025250     60200   16.7600  145.3600       6.8        62       313        93
WVCT   2025250     60200   16.7200  145.3000       6.8        63       321        61
WVCT   2025250     60200   16.7700  144.8200       9.8        26       319        87
WVCT   2025250     60200   16.7300  144.8000      10.1        24       316        91
WVCT   2025250     60200   16.7900  144.6900       9.1        37       345        62
WVCT   2025250     60200   16.7900  144.5300      12.3        33       304        90
WVCT   2025250     60200   16.7300  144.4400      12.9        32       279        97
WVCT   2025250     60200   16.7100  144.4200      12.1        34       277        96
WVCT   2025250     60200   16.7900  144.2800       8.5        30       284        73
WVCT   2025250     60200   16.7300  144.1900      13.0        18       280        76
WVCT   2025250     60200   16.7100  144.0700      18.7         9       260        87
WVCT   2025250     60200   16.7100  143.9700      18.9        12       233        85
WVCT   2025250     60200   16.7700  143.8600      19.4        12       210        83
WVCT   2025250     60200   16.7900  143.8400      20.4        12       206        83
WVCT   2025250     60200   16.7800  143.6900      21.0         8       190        82
WVCT   2025250     60200   16.7300  143.6100      17.0         3       187        86
WVCT   2025250     60200   16.7100  143.5500      15.2         4       182        84
WVCT   2025250     60200   16.7400  143.4600      10.1        14       175        71
WVCT   2025250     60200   16.7200  143.2900       6.8        31       169        68
WVCT   2025250     60200   16.7600  142.7900       8.5       150       156        62
WVCT   2025250     60200   16.7800  142.6600      13.3       179       142        69
WVCT   2025250     60200   16.7800  142.5200      13.8       197       129        63
WVCT   2025250     60200   16.7200  142.4600       9.8       204       132        74
WVCT   2025250     60200   16.7400  142.3900       9.7       186       145        79
WVCT   2025250     60200   16.7000  142.3100      11.2       167       153        88
WVCT   2025250     60200   16.7200  142.2100      13.8       165       170        83
WVCT   2025250     60200   16.7800  142.0300       6.7       165       187        62
WVCT   2025250     60200   16.7200  141.8500      14.8       178       195        88
WVCT   2025250     60200   16.7200  141.8100      12.2       180       196        81
WVCT   2025250     60200   16.7000  141.7200       6.4       183       198        80
WVCT   2025250     60200   16.7700  141.2800       4.8        87       269        61
WVCT   2025250     60200   16.7100  141.2400       5.0       103       281        62
WVCT   2025250     60200   16.7300  140.9800       8.7       174       282        75
WVCT   2025250     60200   16.7700  140.6900       7.9       177       342        75
WVCT   2025250     60200   16.7500  140.5800       9.0       195       346        69
WVCT   2025250     60200   16.7000  145.3200       6.2        63       313        61
WVCT   2025250     60200   16.6400  144.7800       8.0        28       315        92
WVCT   2025250     60200   16.6200  144.5800       6.9        48       308        63
WVCT   2025250     60200   16.6700  144.4300      10.9        36       281        98
WVCT   2025250     60200   16.6900  144.4000      11.0        37       274        93
WVCT   2025250     60200   16.6700  144.3200       9.5        42       278        89
WVCT   2025250     60200   16.6300  144.1400      13.6        16       288        85
WVCT   2025250     60200   16.6500  144.0700      19.6         8       272        88
WVCT   2025250     60200   16.6300  144.0300      21.4         7       257        84
WVCT   2025250     60200   16.6900  143.9300      18.8        12       222        82
WVCT   2025250     60200   16.6700  143.8400      16.9        11       201        82
WVCT   2025250     60200   16.6900  143.6700      20.9         2       189        85
WVCT   2025250     60200   16.6100  143.6200      16.8         3       188        87
WVCT   2025250     60200   16.6700  143.5500      14.4         2       183        79
WVCT   2025250     60200   16.6500  143.3800       6.3         7       181        69
WVCT   2025250     60200   16.6700  143.3200       6.1        19       178        61
WVCT   2025250     60200   16.6000  142.7300       7.1       226       140        76
WVCT   2025250     60200   16.6200  142.6300       8.6       227       133        73
WVCT   2025250     60200   16.6800  142.5800       9.3       215       129        67
WVCT   2025250     60200   16.6800  142.4800       8.8       210       131        82
WVCT   2025250     60200   16.6800  142.3700       9.1       173       150        72
WVCT   2025250     60200   16.6000  142.2300      12.1       160       173        86
WVCT   2025250     60200   16.6800  142.2100      13.4       164       172        85
WVCT   2025250     60200   16.6200  141.9600      12.6       165       190        65
WVCT   2025250     60200   16.6000  141.8700      16.6       176       199        84
WVCT   2025250     60200   16.6200  141.7900      11.9       180       201        87
WVCT   2025250     60200   16.6000  141.6600       7.1       167       203        85
WVCT   2025250     60200   16.6600  141.3700       4.1       109       244        84
WVCT   2025250     60200   16.6000  141.3300       4.6       109       254        77
WVCT   2025250     60200   16.6000  141.1800       4.4       103       300        75
WVCT   2025250     60200   16.6000  140.9900      10.8       201       284        82
WVCT   2025250     60200   16.6000  140.9400      12.1       199       276        76
WVCT   2025250     60200   16.5200  145.3500       4.7        48       309        62
WVCT   2025250     60200   16.6000  144.7800       6.8        31       311        80
WVCT   2025250     60200   16.5200  144.7500       5.7        38       307        73
WVCT   2025250     60200   16.5200  144.4800       5.4        72       292        77
WVCT   2025250     60200   16.5600  144.4100       6.8        55       281        88
WVCT   2025250     60200   16.5700  144.2900       8.3        46       281        90
WVCT   2025250     60200   16.5500  144.2700       8.1        45       288        90
WVCT   2025250     60200   16.5700  144.1400      11.9        20       293        87
WVCT   2025250     60200   16.5700  144.0100      20.4         7       254        85
WVCT   2025250     60200   16.5300  143.9900      18.6         8       247        84
WVCT   2025250     60200   16.5500  143.8500      10.5        20       215        94
WVCT   2025250     60200   16.5100  143.7500       7.3        27       201        83
WVCT   2025250     60200   16.5900  143.6200      15.3         5       188        87
WVCT   2025250     60200   16.5500  143.6000      11.2         9       188        84
WVCT   2025250     60200   16.5500  143.4300       8.0       338       187        77
WVCT   2025250     60200   16.5300  143.3900       8.9       334       187        78
WVCT   2025250     60200   16.5500  143.1800       5.1       327       162        71
WVCT   2025250     60200   16.5900  143.1300       4.6       333       159        75
WVCT   2025250     60200   16.5300  143.0300       6.9       306       162        61
WVCT   2025250     60200   16.5100  142.9300       9.5       284       162        73
WVCT   2025250     60200   16.5100  142.8000       9.2       258       159        60
WVCT   2025250     60200   16.5500  142.7100       8.6       234       145        74
WVCT   2025250     60200   16.5500  142.5900       7.0       234       138        81
WVCT   2025250     60200   16.5800  142.4800       5.1       221       144        62
WVCT   2025250     60200   16.5600  142.4400       5.3       193       150        78
WVCT   2025250     60200   16.5800  142.3200      10.7       156       153        90
WVCT   2025250     60200   16.5800  142.2500      11.7       159       166        86
WVCT   2025250     60200   16.5400  141.9200      17.1       172       199        79
WVCT   2025250     60200   16.5400  141.8700      18.1       178       202        64
WVCT   2025250     60200   16.5800  141.7900      12.9       181       203        70
WVCT   2025250     60200   16.5400  141.6600       9.6       167       205        87
WVCT   2025250     60200   16.5000  141.6000       8.5       158       211        89
WVCT   2025250     60200   16.5200  141.3100       4.5       107       264        61
WVCT   2025250     60200   16.5400  141.2200       5.6        94       295        67
WVCT   2025250     60200   16.5400  140.9500      12.6       213       291        79
WVCT   2025250     60200   16.5800  140.9200      12.2       204       276        75
WVCT   2025250     60200   16.5000  140.7600       9.8       198       305        72
WVCT   2025250     60200   16.5000  140.7400       9.1       196       312        63
WVCT   2025250     60200   16.4800  145.3500       5.6        44       313        67
WVCT   2025250     60200   16.5000  145.3100       6.5        41       341        75
WVCT   2025250     60200   16.5000  144.7500       5.5        40       315        68
WVCT   2025250     60200   16.5000  144.5400       4.9        79       292        71
WVCT   2025250     60200   16.4400  144.4000       4.0        67       296        62
WVCT   2025250     60200   16.4800  144.2300       6.6        42       310        83
WVCT   2025250     60200   16.4200  144.1700       6.5        39       326        83
WVCT   2025250     60200   16.5000  144.0000      17.6        11       270        82
WVCT   2025250     60200   16.4800  143.9600      15.8        12       249        83
WVCT   2025250     60200   16.4900  143.8900      10.5        15       224        92
WVCT   2025250     60200   16.4900  143.7200       7.5        35       196        79
WVCT   2025250     60200   16.4200  143.6900       8.0        41       205        87
WVCT   2025250     60200   16.4700  143.5400       6.7        18       189        77
WVCT   2025250     60200   16.4100  143.4400       7.7       342       192        83
WVCT   2025250     60200   16.4100  143.3900       9.5       331       192        81
WVCT   2025250     60200   16.4100  143.2300      13.5       299       168        78
WVCT   2025250     60200   16.4500  143.1600      12.9       295       163        71
WVCT   2025250     60200   16.4900  143.0800       9.1       308       163        64
WVCT   2025250     60200   16.4900  142.9900       9.6       293       163        73
WVCT   2025250     60200   16.4900  142.9100      10.7       280       163        71
WVCT   2025250     60200   16.4900  142.6500       8.1       240       150        72
WVCT   2025250     60200   16.4700  142.4200       4.8       193       153        79
WVCT   2025250     60200   16.4900  142.2100      11.7       170       180        86
WVCT   2025250     60200   16.4500  142.0900      18.8       174       185        90
WVCT   2025250     60200   16.4300  142.0000      22.5       172       194        78
WVCT   2025250     60200   16.4500  141.9000      20.5       175       206        70
WVCT   2025250     60200   16.4800  141.8600      19.7       178       205        62
WVCT   2025250     60200   16.4400  141.6200       9.0       166       214        90
WVCT   2025250     60200   16.4600  141.6000       8.2       160       215        84
WVCT   2025250     60200   16.4400  141.3100       5.1       106       267        69
WVCT   2025250     60200   16.4400  141.1600       5.8        89       307        84
WVCT   2025250     60200   16.4400  141.1200       5.1       103       314        72
WVCT   2025250     60200   16.4000  140.9500      10.1       210       311        67
WVCT   2025250     60200   16.4200  140.8900      11.8       210       298        82
WVCT   2025250     60200   16.4600  140.8000      10.5       199       298        81
WVCT   2025250     60200   16.4200  140.6800       8.7       178       327        72
WVCT   2025250     60200   16.3700  145.3200       8.2        60       331        63
WVCT   2025250     60200   16.3500  145.3000       9.1        59       333        64
WVCT   2025250     60200   16.4000  144.5400       4.6        78       291        62
WVCT   2025250     60200   16.3200  144.4700       4.2        76       293        77
WVCT   2025250     60200   16.4000  144.0600      11.3        32       326        67
WVCT   2025250     60200   16.3600  143.9800      14.9        29       309        74
WVCT   2025250     60200   16.3600  143.9000      14.0        28       249        94
WVCT   2025250     60200   16.3200  143.8400      12.7        31       234        89
WVCT   2025250     60200   16.3600  143.6700       8.2        41       214        85
WVCT   2025250     60200   16.3200  143.6500       8.3        44       219        86
WVCT   2025250     60200   16.3600  143.5400       5.9        40       201        68
WVCT   2025250     60200   16.3400  143.4400       5.7       327       200        84
WVCT   2025250     60200   16.3200  143.3500       8.1       307       200        82
WVCT   2025250     60200   16.3700  143.2100      14.0       297       170        82
WVCT   2025250     60200   16.3200  143.1700      15.3       295       173        74
WVCT   2025250     60200   16.3500  143.0800      16.1       304       166        81
WVCT   2025250     60200   16.3500  142.1800      11.8       171       184        61
WVCT   2025250     60200   16.3900  142.1100      16.6       176       185        60
WVCT   2025250     60200   16.3500  141.9000      13.6       174       215        86
WVCT   2025250     60200   16.3100  141.7800       9.6       180       219        80
WVCT   2025250     60200   16.3900  141.6700      11.3       177       213        93
WVCT   2025250     60200   16.3100  141.6300       7.5       177       224        69
WVCT   2025250     60200   16.3500  141.3100       5.1       101       272        83
WVCT   2025250     60200   16.3400  140.9700       9.1       202       300        60
WVCT   2025250     60200   16.3300  140.8700       9.7       194       300        67
WVCT   2025250     60200   16.3800  140.7800       9.7       179       311        63
WVCT   2025250     60200   16.3800  140.6800       9.4       167       331        77
WVCT   2025250     60200   16.2700  145.5300       6.0       139       311        64
WVCT   2025250     60200   16.2300  145.2800      10.6        63       332        77
WVCT   2025250     60200   16.3100  144.6700       5.3        46       314        70
WVCT   2025250     60200   16.2300  144.6200       4.8        58       310        83
WVCT   2025250     60200   16.2800  143.9900      11.1        36       324        74
WVCT   2025250     60200   16.2600  143.9000      14.5        40       313        88
WVCT   2025250     60200   16.3000  143.8200      12.7        34       234        89
WVCT   2025250     60200   16.2200  143.7600      11.9        43       240        80
WVCT   2025250     60200   16.3000  143.6300       8.0        46       222        86
WVCT   2025250     60200   16.3000  143.5900       7.0        48       217        84
WVCT   2025250     60200   16.2200  143.4900       4.5       349       231        74
WVCT   2025250     60200   16.2600  143.3200       6.2       307       206        62
WVCT   2025250     60200   16.3000  143.2300      11.6       295       193        78
WVCT   2025250     60200   16.3000  143.2100      12.5       294       191        76
WVCT   2025250     60200   16.3000  143.1200      15.0       301       170        81
WVCT   2025250     60200   16.2200  142.9600      11.1       301       177        81
WVCT   2025250     60200   16.2400  142.9200      11.2       297       176        80
WVCT   2025250     60200   16.2200  142.8100       8.5       294       172        79
WVCT   2025250     60200   16.2800  142.7300       9.5       302       161        67
WVCT   2025250     60200   16.2900  142.6000       5.0       293       159        65
WVCT   2025250     60200   16.2500  141.9300       6.5       164       215        78
WVCT   2025250     60200   16.2900  141.8000       7.4       177       220        85
WVCT   2025250     60200   16.2500  141.7400       7.4       178       220        71
WVCT   2025250     60200   16.2900  141.6300       6.9       177       227        65
WVCT   2025250     60200   16.2300  141.3600       4.8       113       266        81
WVCT   2025250     60200   16.2900  141.3100       5.0       112       280        82
WVCT   2025250     60200   16.2700  140.8700       9.9       190       294        67
WVCT   2025250     60200   16.1400  145.6000       6.0       155       344        65
WVCT   2025250     60200   16.1400  145.4200       5.9        82       298        69
WVCT   2025250     60200   16.1400  145.3300       8.6        62       314        69
WVCT   2025250     60200   16.2100  144.6200       4.5        61       316        79
WVCT   2025250     60200   16.2100  144.2000       4.3        48       253        61
WVCT   2025250     60200   16.1300  144.1400       4.9        47       284        65
WVCT   2025250     60200   16.1500  143.9900       6.1        35       314        74
WVCT   2025250     60200   16.1800  143.9300       9.6        43       320        70
WVCT   2025250     60200   16.1600  143.8000      14.2        41       296        84
WVCT   2025250     60200   16.1500  143.7600      14.5        52       290        84
WVCT   2025250     60200   16.1300  143.6800      13.2        55       264        82
WVCT   2025250     60200   16.1400  143.5700       7.7        35       251        75
WVCT   2025250     60200   16.2000  143.4700       5.9       324       236        79
WVCT   2025250     60200   16.1600  143.3800       8.2       318       231        86
WVCT   2025250     60200   16.1200  143.0500      12.5       274       192        83
WVCT   2025250     60200   16.1400  143.0100      12.3       279       185        85
WVCT   2025250     60200   16.1400  142.8800      11.1       286       179        84
WVCT   2025250     60200   16.1200  142.7700       7.3       296       174        64
WVCT   2025250     60200   16.1200  142.0800       6.0       150       201        83
WVCT   2025250     60200   16.1200  141.9900       6.1       154       214        79
WVCT   2025250     60200   16.1900  141.9500       5.0       152       215        80
WVCT   2025250     60200   16.1200  141.7400       6.8       159       230        60
WVCT   2025250     60200   16.1900  141.6500       6.1       167       238        61
WVCT   2025250     60200   16.1900  141.3800       4.9       116       262        79
WVCT   2025250     60200   16.1300  141.2800       7.3       127       296        73
WVCT   2025250     60200   16.1900  141.1900       5.6       135       311        64
WVCT   2025250     60200   16.1900  140.9400      10.4       203       294        64
WVCT   2025250     60200   16.1300  140.8500      10.7       201       309        84
WVCT   2025250     60200   16.1100  140.7500       8.7       196       311        72
WVCT   2025250     60200   16.0800  145.5900       5.1       148       349        62
WVCT   2025250     60200   16.1000  145.5600       5.9       142       308        83
WVCT   2025250     60200   16.1200  145.4000       6.2        71       301        85
WVCT   2025250     60200   16.0600  145.3400       6.7        61       308        88
WVCT   2025250     60200   16.0600  145.2900       7.6        57       320        71
WVCT   2025250     60200   16.0300  144.4400       4.0        62       333        74
WVCT   2025250     60200   16.0500  144.0800       5.6        43       289        71
WVCT   2025250     60200   16.0300  144.0600       5.6        39       290        64
WVCT   2025250     60200   16.1100  143.8000      12.5        39       325        83
WVCT   2025250     60200   16.1100  143.7000      13.2        53       287        79
WVCT   2025250     60200   16.1100  143.6600      12.9        52       271        81
WVCT   2025250     60200   16.0300  143.5300      10.2        37       271        82
WVCT   2025250     60200   16.0300  143.4700       9.0        13       257        83
WVCT   2025250     60200   16.0300  143.3900       9.2       346       243        76
WVCT   2025250     60200   16.0700  143.2400      10.4       316       212        65
WVCT   2025250     60200   16.0300  143.1200      12.4       286       201        65
WVCT   2025250     60200   16.0300  143.1100      12.8       282       199        65
WVCT   2025250     60200   16.1000  143.0100      13.2       275       188        83
WVCT   2025250     60200   16.0200  142.9000      11.9       290       182        76
WVCT   2025250     60200   16.1000  142.7800       8.3       296       176        72
WVCT   2025250     60200   16.0600  142.7300       7.9       291       175        61
WVCT   2025250     60200   16.0200  142.4600       4.1       151       182        69
WVCT   2025250     60200   16.0800  142.2900       4.7       304       187        84
WVCT   2025250     60200   16.0600  142.2100       4.3       305       191        61
WVCT   2025250     60200   16.0200  141.8700       5.2       157       226        64
WVCT   2025250     60200   16.0200  141.7200       7.8       152       251        79
WVCT   2025250     60200   16.0600  141.3200       7.5       135       293        85
WVCT   2025250     60200   16.0800  141.3000       7.3       131       296        84
WVCT   2025250     60200   16.0800  141.2100       5.9       143       303        63
WVCT   2025250     60200   16.0200  140.9600       8.9       203       310        66
WVCT   2025250     60200   16.0900  140.8700      10.6       202       318        78
WVCT   2025250     60200   16.0900  140.7500       8.5       195       314        68
WVCT   2025250     60200   16.0700  140.7300       7.8       196       318        60
WVCT   2025250     60200   16.0700  140.6400       7.3       193       327        60
WVCT   2025250     60200   15.9400  145.5500       4.1       114       281        85
WVCT   2025250     60200   15.9400  145.4500       4.7        84       264        90
WVCT   2025250     60200   16.0000  145.3400       5.9        73       305        67
WVCT   2025250     60200   15.9400  145.2600       5.5        71       294        71
WVCT   2025250     60200   15.9400  144.3400       4.6        38       325        68
WVCT   2025250     60200   15.9400  144.3200       4.6        34       322        61
WVCT   2025250     60200   15.9900  144.1300       4.1        36       296        83
WVCT   2025250     60200   15.9500  144.0000       5.9        24       302        68
WVCT   2025250     60200   16.0100  143.5800      11.6        46       298        65
WVCT   2025250     60200   16.0100  143.4900       9.5        27       268        81
WVCT   2025250     60200   16.0100  143.4700       9.2        21       261        84
WVCT   2025250     60200   15.9700  143.3100       8.8         1       237        80
WVCT   2025250     60200   15.9300  143.2400       6.7       359       218        81
WVCT   2025250     60200   16.0100  143.1400      11.4       293       203        67
WVCT   2025250     60200   15.9300  143.0800       7.2       298       199        74
WVCT   2025250     60200   15.9300  142.9100       7.2       295       191        74
WVCT   2025250     60200   15.9300  142.8900       7.2       294       189        75
WVCT   2025250     60200   15.9900  142.7400       9.3       278       180        68
WVCT   2025250     60200   15.9300  142.6300       7.3       245       183        81
WVCT   2025250     60200   15.9300  142.5900       5.9       226       183        77
WVCT   2025250     60200   15.9800  142.5100       5.0       167       182        84
WVCT   2025250     60200   16.0000  141.8900       4.8       161       226        60
WVCT   2025250     60200   15.9400  141.7700       8.8       150       245        82
WVCT   2025250     60200   16.0000  141.7400       8.4       152       251        81
WVCT   2025250     60200   15.9200  141.3700       7.5       175       296        71
WVCT   2025250     60200   16.0000  141.2100       5.4       164       297        65
WVCT   2025250     60200   15.9800  140.9400       8.6       201       309        73
WVCT   2025250     60200   15.9200  140.9000       7.6       200       311        76
WVCT   2025250     60200   15.9600  140.7500       6.5       193       342        68
WVCT   2025250     60200   15.9400  140.5600       6.1       188       349        82
WVCT   2025250     60200   15.8700  145.4100       5.7       117       266        62
WVCT   2025250     60200   15.8400  144.3400       4.5        46       336        77
WVCT   2025250     60200   15.8400  144.2800       4.5        39       320        74
WVCT   2025250     60200   15.9200  144.0400       4.9        29       297        84
WVCT   2025250     60200   15.9100  143.9600       6.3        32       312        72
WVCT   2025250     60200   15.8400  143.9000       6.8        41       311        80
WVCT   2025250     60200   15.9100  143.7900       5.3        25       341        64
WVCT   2025250     60200   15.9100  143.3500       7.8        25       261        71
WVCT   2025250     60200   15.9100  143.2500       6.4        11       227        84
WVCT   2025250     60200   15.9100  143.2200       5.7       359       212        76
WVCT   2025250     60200   15.9100  143.1000       5.5       311       201        65
WVCT   2025250     60200   15.8900  142.9700       4.8       299       198        60
WVCT   2025250     60200   15.9100  142.9500       6.0       299       196        74
WVCT   2025250     60200   15.8900  142.8200       6.3       271       193        82
WVCT   2025250     60200   15.9100  142.7000       9.1       258       187        86
WVCT   2025250     60200   15.9100  142.5900       6.1       226       186        67
WVCT   2025250     60200   15.8300  141.8500       7.2       147       252        75
WVCT   2025250     60200   15.9000  141.7900       8.6       149       252        83
WVCT   2025250     60200   15.9000  141.3500       7.7       180       298        61
WVCT   2025250     60200   15.8400  141.0100       7.2       205       276        63
WVCT   2025250     60200   15.8200  140.9200       6.4       203       290        71
WVCT   2025250     60200   15.8200  140.6000       5.9       184       348        84
WVCT   2025250     60200   15.8300  145.4300       6.9       128       259        77
WVCT   2025250     60200   15.7900  145.2300       4.3        65       284        61
WVCT   2025250     60200   15.7700  145.2100       4.6        59       286        61
WVCT   2025250     60200   15.7500  145.1000       5.9        75       285        62
WVCT   2025250     60200   15.7900  145.0000       7.5        76       331        67
WVCT   2025250     60200   15.8200  144.3400       4.1        49       341        65
WVCT   2025250     60200   15.8000  143.8600       7.1        44       306        84
WVCT   2025250     60200   15.7400  143.7600       5.8        53       305        83
WVCT   2025250     60200   15.7400  143.7400       6.0        55       307        80
WVCT   2025250     60200   15.7700  142.7400       6.4       259       203        73
WVCT   2025250     60200   15.7900  142.6200       7.0       249       197        72
WVCT   2025250     60200   15.8100  142.6000       6.5       244       195        68
WVCT   2025250     60200   15.7900  141.8800       6.4       146       247        65
WVCT   2025250     60200   15.8100  141.8400       6.9       147       260        77
WVCT   2025250     60200   15.7300  141.4800       5.9       180       282        80
WVCT   2025250     60200   15.7300  141.4300       7.7       177       293        85
WVCT   2025250     60200   15.7700  141.2900       7.5       179       310        81
WVCT   2025250     60200   15.7300  141.2400       7.0       182       317        68
WVCT   2025250     60200   15.7700  140.9500       5.8       200       290        83
WVCT   2025250     60200   15.8000  140.9000       6.1       203       315        79
WVCT   2025250     60200   15.8000  140.5400       6.3       194       329        70
WVCT   2025250     60200   15.7100  145.1200       5.1        73       301        69
WVCT   2025250     60200   15.6900  145.0200       6.5        73       318        67
WVCT   2025250     60200   15.6500  144.9200       7.0        75       332        78
WVCT   2025250     60200   15.7200  143.7600       5.7        52       294        80
WVCT   2025250     60200   15.6800  143.7200       6.5        58       288        81
WVCT   2025250     60200   15.6800  143.6400       8.4        64       292        62
WVCT   2025250     60200   15.6600  143.5500       8.9        63       297        64
WVCT   2025250     60200   15.6800  142.9000       4.1       261       233        73
WVCT   2025250     60200   15.6400  142.8100       7.3       258       230        75
WVCT   2025250     60200   15.6800  142.7500       7.9       258       225        61
WVCT   2025250     60200   15.7100  142.6200       8.1       250       209        73
WVCT   2025250     60200   15.6800  142.5400       6.2       225       211        80
WVCT   2025250     60200   15.6600  142.4800       6.2       208       212        68
WVCT   2025250     60200   15.7100  141.9200       5.8       143       259        63
WVCT   2025250     60200   15.6700  141.4800       6.3       185       282        67
WVCT   2025250     60200   15.6500  141.4600       6.8       186       286        71
WVCT   2025250     60200   15.7100  141.2200       7.4       188       321        66
WVCT   2025250     60200   15.6300  141.1600       8.4       206       304        69
WVCT   2025250     60200   15.6900  140.7800       7.3       200       349        88
WVCT   2025250     60200   15.5600  145.4300       5.1        51       298        62
WVCT   2025250     60200   15.5700  144.9200       4.9        87       337        68
WVCT   2025250     60200   15.5500  144.8800       4.6        86       339        61
WVCT   2025250     60200   15.5700  143.9100       4.5       338       308        60
WVCT   2025250     60200   15.5900  143.6600       6.5        56       277        62
WVCT   2025250     60200   15.6000  143.5800       9.4        64       277        70
WVCT   2025250     60200   15.5700  143.4900       8.4        65       272        79
WVCT   2025250     60200   15.5500  143.4500       7.3        63       271        72
WVCT   2025250     60200   15.6000  143.1100       4.4       304       264        82
WVCT   2025250     60200   15.6200  143.0700       4.1       302       257        85
WVCT   2025250     60200   15.5600  142.6900       8.7       265       235        73
WVCT   2025250     60200   15.5400  142.5200       5.9       264       224        83
WVCT   2025250     60200   15.5600  142.4800       5.9       251       220        85
WVCT   2025250     60200   15.5900  141.1400       8.2       206       291        69
WVCT   2025250     60200   15.5000  145.4500       4.8        49       273        65
WVCT   2025250     60200   15.4600  144.8900       4.5       102       333        65
WVCT   2025250     60200   15.5100  144.4400       5.3        46       350        73
WVCT   2025250     60200   15.4700  144.3800       5.2        49       343        69
WVCT   2025250     60200   15.4700  144.2800       5.1        52       348        86
WVCT   2025250     60200   15.5300  143.3900       4.9        44       268        82
WVCT   2025250     60200   15.4900  143.1600       4.7       301       260        84
WVCT   2025250     60200   15.4900  143.0500       5.7       287       256        78
WVCT   2025250     60200   15.4900  142.9900       6.0       283       252        61
WVCT   2025250     60200   15.4500  142.9000       6.6       279       252        61
WVCT   2025250     60200   15.4500  142.7600       7.1       282       245        66
WVCT   2025250     60200   15.4500  142.6700       6.4       291       242        62
WVCT   2025250     60200   15.4500  142.6500       6.0       293       241        61
WVCT   2025250     60200   15.4600  142.5000       4.4       282       227        74
WVCT   2025250     60200   15.5000  141.3400       6.6       202       294        78
WVCT   2025250     60200   15.5000  141.2900       6.4       206       300        63
WVCT   2025250     60200   15.4400  141.2300       6.3       205       304        81
WVCT   2025250     60200   15.3900  145.4300       4.1        69       229        94
WVCT   2025250     60200   15.3700  145.3900       4.2        72       236        62
WVCT   2025250     60200   15.4000  144.4700       4.8        51       336        60
WVCT   2025250     60200   15.3800  144.4100       4.8        54       333        74
WVCT   2025250     60200   15.3600  144.3400       5.0        53       332        73
WVCT   2025250     60200   15.4000  144.1900       4.1        50       333        73
WVCT   2025250     60200   15.3600  144.0100       4.6        46       286        81
WVCT   2025250     60200   15.3600  143.9700       5.9        42       283        67
WVCT   2025250     60200   15.4100  143.0100       5.2       294       262        60
WVCT   2025250     60200   15.4300  142.9300       6.0       285       255        60
WVCT   2025250     60200   15.3900  142.7200       6.5       292       245        65
WVCT   2025250     60200   15.4100  142.6500       5.9       293       241        76
WVCT   2025250     60200   15.3500  142.5300       4.3       279       239        68
WVCT   2025250     60200   15.3700  142.5100       4.2       277       237        68
WVCT   2025250     60200   15.3600  141.3200       6.1       199       302        72
WVCT   2025250     60200   15.3300  145.4000       4.1        78       224        88
WVCT   2025250     60200   15.3100  145.2500       4.5        70       249        76
WVCT   2025250     60200   15.2800  144.8100       5.2        64       273        62
WVCT   2025250     60200   15.2700  144.7500       5.5        63       282        62
WVCT   2025250     60200   15.2800  144.6600       4.8        59       330        61
WVCT   2025250     60200   15.3400  144.4500       4.1        59       334        74
WVCT   2025250     60200   15.3000  144.3300       4.4        57       342        80
WVCT   2025250     60200   15.2600  143.9900       4.5        52       289        79
WVCT   2025250     60200   15.3000  143.8600       7.6        38       294        65
WVCT   2025250     60200   15.2900  142.8100       4.2       295       277        81
WVCT   2025250     60200   15.2900  142.7200       5.1       296       255        77
WVCT   2025250     60200   15.2900  141.4300       6.8       192       288        86
WVCT   2025250     60200   15.3100  141.3800       6.6       198       303        83
WVCT   2025250     60200   15.1900  145.4700       4.6        83       216        70
WVCT   2025250     60200   15.2100  145.4600       4.5        88       212        82
WVCT   2025250     60200   15.2500  144.8100       4.8        69       248        63
WVCT   2025250     60200   15.2000  143.8200       6.3        50       310        61
WVCT   2025250     60200   15.1600  142.2000       4.0       148       293        78
WVCT   2025250     60200   15.1600  142.1100       5.1       156       269        77
WVCT   2025250     60200   15.1700  142.0500       5.3       157       278        80
WVCT   2025250     60200   15.1500  141.9600       5.8       166       280        62
WVCT   2025250     60200   15.2100  141.5400       5.4       169       268        84
WVCT   2025250     60200   15.2100  141.4700       5.9       174       313        61
WVCT   2025250     60200   15.1600  145.4900       4.6        77       218        60
WVCT   2025250     60200   15.0800  145.3900       4.9        80       212        69
WVCT   2025250     60200   15.1100  143.7900       4.2        54       305        75
WVCT   2025250     60200   15.1100  143.7700       4.5        55       308        78
WVCT   2025250     60200   15.1400  142.1300       5.1       156       259        71
WVCT   2025250     60200   15.0800  142.0100       5.9       170       267        85
WVCT   2025250     60200   15.0800  141.9000       5.4       176       273        74
WVCT   2025250     60200   15.0800  141.7100       4.9       200       300        73
WVCT   2025250     60200   15.1000  141.6200       4.7       196       298        82
WVCT   2025250     60200   15.1200  141.5800       4.6       182       299        75
WVCT   2025250     60200   15.0200  145.4100       4.6        71       212        70
WVCT   2025250     60200   15.0400  145.1800       4.1        84       207        65
WVCT   2025250     60200   15.0100  144.3600       4.2        64       345        61
WVCT   2025250     60200   14.9600  142.2000       4.5       164       242        80
WVCT   2025250     60200   14.9800  142.1200       5.5       166       252        80
WVCT   2025250     60200   15.0000  142.0100       6.2       172       272        78
WVCT   2025250     60200   15.0000  141.9000       5.4       180       279        76
WVCT   2025250     60200   15.0000  141.8000       4.7       182       298        76
WVCT   2025250     60200   14.9800  141.7800       4.4       185       339        66
WVCT   2025250     60200   15.0400  141.6500       4.6       203       339        61
WVCT   2025250     60200   14.9600  145.3700       4.6        67       212        86
WVCT   2025250     60200   14.9600  145.3100       4.9        71       212        67
WVCT   2025250     60200   14.9000  145.2300       5.1        89       221        80
WVCT   2025250     60200   14.9000  143.7900       4.3        90       245        72
WVCT   2025250     60200   14.9300  142.2400       4.5       159       241        70
WVCT   2025250     60200   14.9500  142.2200       4.6       162       240        78
WVCT   2025250     60200   14.9400  142.0500       5.9       167       268        87
WVCT   2025250     60200   14.9400  142.0300       5.9       168       274        82
WVCT   2025250     60200   14.9100  141.8600       4.8       164       328        80
WVCT   2025250     60200   14.9200  141.8400       4.6       168       328        79
WVCT   2025250     60200   14.7900  145.3600       4.8        77       199        65
WVCT   2025250     60200   14.8100  145.0700       5.4       103       283        66
WVCT   2025250     60200   14.7900  142.1900       4.6       147       248        67
WVCT   2025250     60200   14.8100  142.0200       4.6       149       320        64
WVCT   2025250     60200   14.7700  145.2200       5.8        95       206        89
WVCT   2025250     60200   14.7700  145.0500       5.2       103       276        79
WVCT   2025250     60200   14.7700  144.9200       5.0       103       317        69
WVCT   2025250     60200   14.7500  142.1400       4.0       152       276        84
WVCT   2025250     60200   14.7500  141.7600       4.3       176       346        68
WVCT   2025250     60200   14.6000  145.2400       5.4        97       196        81
WVCT   2025250     60200   14.6500  145.1400       6.0        96       199        77
WVCT   2025250     60200   14.5800  142.1500       8.6       123       330        70
WVCT   2025250     60200   14.5800  142.1100       9.0       126       339        65
WVCT   2025250     60200   14.6000  141.8700       6.5       182       346        66
WVCT   2025250     60200   14.4900  142.3900       4.3       134       276        74
WVCT   2025250     60200   14.5100  142.3400       4.8       134       288        83
WVCT   2025250     60200   14.5400  142.2800       5.6       129       298        78
WVCT   2025250     60200   14.5600  142.1500       8.7       123       338        68
WVCT   2025250     60200   14.4900  142.0700       7.3       131       347        67
WVCT   2025250     60200   14.5600  141.6800       4.3       150       343        61
WVCT   2025250     60200   14.4100  142.7900       4.2       179       246        77
WVCT   2025250     60200   14.4700  142.3700       4.8       133       280        83
WVCT   2025250     60200   14.4700  142.3200       5.0       131       315        84
WVCT   2025250     60200   14.4700  142.0700       6.8       130       347        67
WVCT   2025250     60200   14.3700  142.8200       4.5       175       242        84
WVCT   2025250     60200   14.3000  142.6900       4.0       183       274        69
WVCT   2025250     60200   14.2800  142.7400       4.6       186       271        80
WVCT   2025250     60200   13.4600  140.8100       4.2        48       233        73
WVCT   2025250     60200   13.4600  140.7000       4.7        46       234        77
WVCT   2025250     60200   13.3900  144.2200       4.9        53       230        81
WVCT   2025250     60200   13.4000  140.7500       4.9        43       225        71
WVCT   2025250     60200   13.2500  141.4800       6.0       110       261        69
WVCT   2025250     60200   13.3100  141.3900       5.6        88       252        68
WVCT   2025250     60200   13.2900  141.3700       5.6        91       252        73
WVCT   2025250     60200   13.1500  141.5500       6.5       116       260        70
WVCT   2025250     60200   13.1900  141.5000       6.5       113       258        86
WVCT   2025250     60200   13.2300  141.4400       6.1       108       253        85
WVCT   2025250     60200   13.1500  141.2500       4.5        92       236        63
WVCT   2025250     60200   13.1700  140.9900       4.3        47       225        77
WVCT   2025250     60200   13.1700  140.8200       5.1        48       241        86
WVCT   2025250     60200   13.1500  140.7900       4.8        51       256        76
WVCT   2025250     60200   13.1500  144.2700       4.8       124       330        85
WVCT   2025250     60200   13.1500  144.2500       4.8       126       288        86
WVCT   2025250     60200   13.0600  141.6100       4.7       105       258        61
WVCT   2025250     60200   13.0600  141.4200       5.4        91       238        65
WVCT   2025250     60200   13.1000  141.3300       5.0        89       236        77
WVCT   2025250     60200   13.0600  141.2900       4.8        86       232        79
WVCT   2025250     60200   13.0600  141.1600       4.0        90       235        83
WVCT   2025250     60200   13.1300  141.0700       4.0        55       231        73
WVCT   2025250     60200   13.1000  140.9000       4.4        50       247        78
WVCT   2025250     60200   13.1000  140.8400       4.3        52       266        60
WVCT   2025250     60200   13.0300  144.2700       5.6       140       286        83
WVCT   2025250     60200   12.9800  144.2100       4.7       137       327        79
WVCT   2025250     60200   13.0200  141.8300       4.7        58       335        66
WVCT   2025250     60200   12.9700  141.4000       4.1        74       220        61
WVCT   2025250     60200   12.9700  141.3200       4.6        68       221        89
WVCT   2025250     60200   13.0000  141.1800       4.0        93       248        89
WVCT   2025250     60200   12.9500  141.8300       4.8        88       268        83
WVCT   2025250     60200   12.9500  141.7700       4.9        85       258        84
WVCT   2025250     60200   12.8900  141.6200       5.4       105       235        82
WVCT   2025250     60200   12.9500  141.3200       4.5        67       219        87
WVCT   2025250     60200   12.9100  141.3000       4.2        67       221        82
WVCT   2025250     60200   12.9300  141.0200       4.0        62       253        86
WVCT   2025250     60200   12.7800  142.2900       4.4        58       334        62
WVCT   2025250     60200   12.8000  141.9200       5.9       113       256        62
WVCT   2025250     60200   12.8300  141.8200       5.3       105       254        67
WVCT   2025250     60200   12.7800  141.7500       6.0       106       234        76
WVCT   2025250     60200   12.8000  141.6000       5.0        84       224        76
WVCT   2025250     60200   12.8300  141.5800       4.5        93       225        72
WVCT   2025250     60200   12.8300  141.3000       4.4        65       257        74
WVCT   2025250     60200   12.6800  141.9100       7.8        98       236        92
WVCT   2025250     60200   12.6800  141.9000       7.8        98       235        94
WVCT   2025250     60200   12.7600  141.7500       6.0       104       233        70
WVCT   2025250     60200   12.7200  141.6400       5.4        79       224        83
WVCT   2025250     60200   12.7200  141.5800       4.7        70       223        79
WVCT   2025250     60200   12.6800  141.3400       5.0        67       272        83
WVCT   2025250     60200   12.7600  141.1700       4.4        79       274        81
WVCT   2025250     60200   12.7400  141.1000       4.8        72       274        71
WVCT   2025250     60200   12.6400  145.6100       4.6       104       278        63
WVCT   2025250     60200   12.5900  142.4700       4.0        84       312        75
WVCT   2025250     60200   12.5900  142.1400       5.3        61       234        81
WVCT   2025250     60200   12.5900  142.0400       6.5        71       233        67
WVCT   2025250     60200   12.5900  141.9900       7.8        75       228        82
WVCT   2025250     60200   12.6100  141.8900       8.7        82       223        91
WVCT   2025250     60200   12.6300  141.7800       7.7        79       223        95
WVCT   2025250     60200   12.6500  141.6500       5.0        69       230        84
WVCT   2025250     60200   12.6600  141.3500       4.7        72       268        84
WVCT   2025250     60200   12.5300  142.2700       4.7        62       241        87
WVCT   2025250     60200   12.5700  142.1700       4.7        64       232        79
WVCT   2025250     60200   12.5000  142.0600       6.6        82       223        83
WVCT   2025250     60200   12.5700  141.9100       8.4        72       219        91
WVCT   2025250     60200   12.5100  141.8200       8.0        59       221        80
WVCT   2025250     60200   12.5700  141.7600       6.9        69       221        91
WVCT   2025250     60200   12.5700  141.6900       5.4        66       231        86
OIR    2025250     60200   17.4000  142.7200      12.2       108       140        60
OIR    2025250     60200   17.4000  142.7000      12.3       108       132        60
OIR    2025250     60200   17.4000  142.6400      12.8       113       140        60
OIR    2025250     60200   17.4000  142.5400      12.9       121       136        60
OIR    2025250     60200   17.3800  142.5400      13.1       122       140        60
OIR    2025250     60200   17.0400  142.9800      11.1        85       136        60
OIR    2025250     60200   16.9600  143.1400       8.2        49       136        60
OIR    2025250     60200   17.4000  142.7600      12.2       108       136        60
OIR    2025250     60200   17.4000  142.7400      12.2       108       140        60
OIR    2025250     60200   17.4000  142.6800      12.4       110       132        60
OIR    2025250     60200   17.3800  142.8000      12.2       108       136        60
OIR    2025250     60200   17.3800  142.7800      12.3       108       136        60
OIR    2025250     60200   17.3800  142.7400      12.3       108       140        60
OIR    2025250     60200   17.3800  142.7200      12.3       109       132        60
OIR    2025250     60200   17.3800  142.7000      12.5       110       136        60
OIR    2025250     60200   17.3800  142.6800      12.7       111       136        60
OIR    2025250     60200   17.3600  142.8600      12.1       105       136        60
OIR    2025250     60200   17.3600  142.8400      12.2       107       136        60
OIR    2025250     60200   17.3600  142.8200      12.2       108       132        60
OIR    2025250     60200   17.3600  142.8000      12.3       108       132        60
OIR    2025250     60200   17.3600  142.7800      12.3       108       136        60
OIR    2025250     60200   17.3600  142.7600      12.4       109       136        60
OIR    2025250     60200   17.3600  142.7400      12.5       110       136        60
OIR    2025250     60200   17.3600  142.7200      12.6       111       132        60
OIR    2025250     60200   17.3600  142.6800      13.0       113       132        60
OIR    2025250     60200   17.3600  142.6600      13.2       115       128        60
OIR    2025250     60200   17.3600  142.6400      13.3       116       132        60
OIR    2025250     60200   17.3400  142.8400      12.3       108       132        60
OIR    2025250     60200   17.3400  142.8200      12.5       109       140        60
OIR    2025250     60200   17.3400  142.8000      12.6       110       136        60
OIR    2025250     60200   17.3400  142.7800      12.7       110       132        60
OIR    2025250     60200   17.3400  142.7600      12.8       111       128        60
OIR    2025250     60200   17.3400  142.7400      12.9       112       136        60
OIR    2025250     60200   17.3400  142.7200      13.1       113       132        60
OIR    2025250     60200   17.3400  142.7000      13.3       114       132        60
OIR    2025250     60200   17.3400  142.6800      13.4       116       132        60
OIR    2025250     60200   17.3400  142.6600      13.6       117       128        60
OIR    2025250     60200   17.3400  142.6400      13.7       119       132        60
OIR    2025250     60200   17.3400  142.6000      13.8       121       132        60
OIR    2025250     60200   17.3400  142.5800      13.7       122       132        60
OIR    2025250     60200   17.3200  142.9000      11.9       101       136        60
OIR    2025250     60200   17.3200  142.8800      12.1       104       136        60
OIR    2025250     60200   17.3200  142.8600      12.4       107       136        60
OIR    2025250     60200   17.3200  142.8400      12.6       109       136        60
OIR    2025250     60200   17.3200  142.8200      12.8       110       132        60
OIR    2025250     60200   17.3200  142.8000      13.0       111       132        60
OIR    2025250     60200   17.3200  142.7800      13.1       112       128        60
OIR    2025250     60200   17.3200  142.7600      13.2       112       123        60
OIR    2025250     60200   17.3200  142.7400      13.4       114       123        60
OIR    2025250     60200   17.3200  142.7200      13.5       115       132        60
OIR    2025250     60200   17.3200  142.7000      13.7       116       123        60
OIR    2025250     60200   17.3200  142.6800      13.8       117       132        60
OIR    2025250     60200   17.3200  142.6600      13.9       119       132        60
OIR    2025250     60200   17.3200  142.6400      14.0       120       136        60
OIR    2025250     60200   17.3200  142.6200      14.0       121       132        60
OIR    2025250     60200   17.3200  142.6000      14.0       121       136        60
OIR    2025250     60200   17.3000  142.9600      11.4        96       136        60
OIR    2025250     60200   17.3000  142.9400      11.8        99       136        60
OIR    2025250     60200   17.3000  142.9200      11.9       100       132        60
OIR    2025250     60200   17.3000  142.9000      12.0       102       132        60
OIR    2025250     60200   17.3000  142.8800      12.3       105       128        60
OIR    2025250     60200   17.3000  142.8600      12.6       108       132        60
OIR    2025250     60200   17.3000  142.8400      12.9       110       128        60
OIR    2025250     60200   17.3000  142.8200      13.1       111       132        60
OIR    2025250     60200   17.3000  142.8000      13.2       112       123        60
OIR    2025250     60200   17.3000  142.7800      13.3       112       128        60
OIR    2025250     60200   17.3000  142.7600      13.5       113       132        60
OIR    2025250     60200   17.3000  142.7400      13.6       114       136        60
OIR    2025250     60200   17.3000  142.7200      13.7       115       132        60
OIR    2025250     60200   17.3000  142.7000      13.8       117       128        60
OIR    2025250     60200   17.3000  142.6800      13.9       118       132        60
OIR    2025250     60200   17.3000  142.6600      14.1       120       132        60
OIR    2025250     60200   17.3000  142.6400      14.1       120       136        60
OIR    2025250     60200   17.2800  142.9800      11.1        90       136        60
OIR    2025250     60200   17.2800  142.9600      11.6        97       136        60
OIR    2025250     60200   17.2800  142.9400      11.8       100       128        60
OIR    2025250     60200   17.2800  142.9200      11.9       101       136        60
OIR    2025250     60200   17.2800  142.9000      12.2       103       132        60
OIR    2025250     60200   17.2800  142.8800      12.6       107       128        60
OIR    2025250     60200   17.2800  142.8600      12.9       110       128        60
OIR    2025250     60200   17.2800  142.8400      13.2       111       128        60
OIR    2025250     60200   17.2800  142.8200      13.3       111       132        60
OIR    2025250     60200   17.2800  142.8000      13.4       112       132        60
OIR    2025250     60200   17.2800  142.7800      13.5       113       132        60
OIR    2025250     60200   17.2800  142.7600      13.6       114       128        60
OIR    2025250     60200   17.2800  142.7400      13.6       115       132        60
OIR    2025250     60200   17.2800  142.7200      13.8       116       128        60
OIR    2025250     60200   17.2800  142.7000      13.9       117       132        60
OIR    2025250     60200   17.2800  142.6800      14.0       118       132        60
OIR    2025250     60200   17.2800  142.6600      14.1       120       136        60
OIR    2025250     60200   17.2600  143.0400      11.1        88       136        60
OIR    2025250     60200   17.2600  143.0000      11.0        89       136        60
OIR    2025250     60200   17.2600  142.9800      11.1        90       128        60
OIR    2025250     60200   17.2600  142.9600      11.6        97       128        60
OIR    2025250     60200   17.2600  142.9400      11.9       100       123        60
OIR    2025250     60200   17.2600  142.9200      12.1       101       123        60
OIR    2025250     60200   17.2600  142.9000      12.4       104       123        60
OIR    2025250     60200   17.2600  142.8800      12.9       108       128        60
OIR    2025250     60200   17.2600  142.8600      13.2       111       132        60
OIR    2025250     60200   17.2600  142.8400      13.3       111       132        60
OIR    2025250     60200   17.2600  142.8200      13.4       112       128        60
OIR    2025250     60200   17.2600  142.8000      13.4       112       128        60
OIR    2025250     60200   17.2600  142.7800      13.5       113       128        60
OIR    2025250     60200   17.2600  142.7600      13.6       114       128        60
OIR    2025250     60200   17.2600  142.7400      13.7       116       128        60
OIR    2025250     60200   17.2600  142.7200      13.8       116       136        60
OIR    2025250     60200   17.2600  142.7000      13.9       117       136        60
OIR    2025250     60200   17.2400  143.0600      11.0        87       132        60
OIR    2025250     60200   17.2400  143.0400      11.0        88       136        60
OIR    2025250     60200   17.2400  143.0200      11.0        89       132        60
OIR    2025250     60200   17.2400  143.0000      11.0        89       132        60
OIR    2025250     60200   17.2400  142.9800      11.2        91       128        60
OIR    2025250     60200   17.2400  142.9600      11.7        96       128        60
OIR    2025250     60200   17.2400  142.9400      11.9        99       123        60
OIR    2025250     60200   17.2400  142.9200      12.2       102       128        60
OIR    2025250     60200   17.2400  142.9000      12.6       106       119        60
OIR    2025250     60200   17.2400  142.8800      13.1       110       123        60
OIR    2025250     60200   17.2400  142.8600      13.4       111       132        60
OIR    2025250     60200   17.2400  142.8400      13.4       112       128        60
OIR    2025250     60200   17.2400  142.8200      13.4       112       119        60
OIR    2025250     60200   17.2400  142.8000      13.5       112       123        60
OIR    2025250     60200   17.2400  142.7800      13.5       114       123        60
OIR    2025250     60200   17.2400  142.7600      13.6       115       128        60
OIR    2025250     60200   17.2400  142.7400      13.7       116       136        60
OIR    2025250     60200   17.2400  142.7200      13.7       116       132        60
OIR    2025250     60200   17.2200  143.0800      10.8        85       132        60
OIR    2025250     60200   17.2200  143.0600      10.7        86       136        60
OIR    2025250     60200   17.2200  143.0400      10.8        87       132        60
OIR    2025250     60200   17.2200  143.0200      10.9        88       132        60
OIR    2025250     60200   17.2200  143.0000      11.0        90       128        60
OIR    2025250     60200   17.2200  142.9800      11.3        93       128        60
OIR    2025250     60200   17.2200  142.9600      11.7        96       115        60
OIR    2025250     60200   17.2200  142.9400      11.9        99       115        60
OIR    2025250     60200   17.2200  142.9200      12.4       103       115        60
OIR    2025250     60200   17.2200  142.9000      12.9       107       123        60
OIR    2025250     60200   17.2200  142.8800      13.2       110       123        60
OIR    2025250     60200   17.2200  142.8600      13.4       111       132        60
OIR    2025250     60200   17.2200  142.8400      13.4       111       115        60
OIR    2025250     60200   17.2200  142.8200      13.5       112       123        60
OIR    2025250     60200   17.2200  142.8000      13.5       113       123        60
OIR    2025250     60200   17.2200  142.7800      13.5       114       119        60
OIR    2025250     60200   17.2200  142.7600      13.6       115       132        60
OIR    2025250     60200   17.2200  142.7400      13.6       116       132        60
OIR    2025250     60200   17.2000  143.1000      10.7        83       132        60
OIR    2025250     60200   17.2000  143.0800      10.6        83       132        60
OIR    2025250     60200   17.2000  143.0600      10.6        84       119        60
OIR    2025250     60200   17.2000  143.0400      10.7        85       128        60
OIR    2025250     60200   17.2000  143.0200      10.9        88       119        60
OIR    2025250     60200   17.2000  143.0000      11.1        90       119        60
OIR    2025250     60200   17.2000  142.9800      11.5        94       115        60
OIR    2025250     60200   17.2000  142.9600      11.8        96       115        60
OIR    2025250     60200   17.2000  142.9400      12.0        98       107        60
OIR    2025250     60200   17.2000  142.9200      12.5       103       119        60
OIR    2025250     60200   17.2000  142.9000      13.0       107       119        60
OIR    2025250     60200   17.2000  142.8800      13.3       109       123        60
OIR    2025250     60200   17.2000  142.8600      13.4       111       123        60
OIR    2025250     60200   17.2000  142.8400      13.5       111       115        60
OIR    2025250     60200   17.2000  142.8200      13.5       112       115        60
OIR    2025250     60200   17.2000  142.8000      13.5       113       115        60
OIR    2025250     60200   17.2000  142.7800      13.5       114       119        60
OIR    2025250     60200   17.2000  142.7600      13.6       116       132        60
OIR    2025250     60200   17.2000  142.7400      13.6       116       128        60
OIR    2025250     60200   17.2000  142.7200      13.6       116       140        60
OIR    2025250     60200   17.2000  142.6400      13.6       119       136        60
OIR    2025250     60200   17.1800  143.1000      10.6        82       136        60
OIR    2025250     60200   17.1800  143.0800      10.6        82       123        60
OIR    2025250     60200   17.1800  143.0600      10.6        83       128        60
OIR    2025250     60200   17.1800  143.0400      10.7        84       119        60
OIR    2025250     60200   17.1800  143.0200      11.0        88       123        60
OIR    2025250     60200   17.1800  143.0000      11.3        91       115        60
OIR    2025250     60200   17.1800  142.9800      11.6        95       115        60
OIR    2025250     60200   17.1800  142.9600      11.9        96       115        60
OIR    2025250     60200   17.1800  142.9400      12.1        97       115        60
OIR    2025250     60200   17.1800  142.9200      12.5       101       115        60
OIR    2025250     60200   17.1800  142.9000      13.0       106       123        60
OIR    2025250     60200   17.1800  142.8800      13.3       108       128        60
OIR    2025250     60200   17.1800  142.8600      13.4       110       128        60
OIR    2025250     60200   17.1800  142.8400      13.5       111       119        60
OIR    2025250     60200   17.1800  142.8200      13.5       112       115        60
OIR    2025250     60200   17.1800  142.8000      13.5       113       119        60
OIR    2025250     60200   17.1800  142.7800      13.6       115       123        60
OIR    2025250     60200   17.1800  142.7600      13.7       116       119        60
OIR    2025250     60200   17.1800  142.7400      13.7       116       140        60
OIR    2025250     60200   17.1800  142.7000      13.6       116       136        60
OIR    2025250     60200   17.1800  142.6600      13.4       117       136        60
OIR    2025250     60200   17.1800  142.6400      13.3       119       136        60
OIR    2025250     60200   17.1600  143.1400      10.4        81       132        60
OIR    2025250     60200   17.1600  143.1200      10.5        81       132        60
OIR    2025250     60200   17.1600  143.1000      10.5        82       132        60
OIR    2025250     60200   17.1600  143.0800      10.6        82       123        60
OIR    2025250     60200   17.1600  143.0600      10.6        82       119        60
OIR    2025250     60200   17.1600  143.0400      10.7        83       128        60
OIR    2025250     60200   17.1600  143.0200      11.1        89       119        60
OIR    2025250     60200   17.1600  143.0000      11.4        92       115        60
OIR    2025250     60200   17.1600  142.9800      11.8        94       115        60
OIR    2025250     60200   17.1600  142.9600      12.0        96       119        60
OIR    2025250     60200   17.1600  142.9400      12.2        97       119        60
OIR    2025250     60200   17.1600  142.9200      12.5       101       115        60
OIR    2025250     60200   17.1600  142.9000      12.9       104       115        60
OIR    2025250     60200   17.1600  142.8800      13.3       108       119        60
OIR    2025250     60200   17.1600  142.8600      13.4       109       119        60
OIR    2025250     60200   17.1600  142.8400      13.5       110       128        60
OIR    2025250     60200   17.1600  142.8200      13.5       112       115        60
OIR    2025250     60200   17.1600  142.8000      13.6       114       128        60
OIR    2025250     60200   17.1600  142.7800      13.6       116       119        60
OIR    2025250     60200   17.1600  142.7600      13.8       118       136        60
OIR    2025250     60200   17.1600  142.7400      13.9       119       136        60
OIR    2025250     60200   17.1600  142.7000      13.6       117       132        60
OIR    2025250     60200   17.1600  142.6600      13.2       117       140        60
OIR    2025250     60200   17.1600  142.6400      12.9       119       136        60
OIR    2025250     60200   17.1400  143.1400      10.4        80       128        60
OIR    2025250     60200   17.1400  143.1200      10.4        81       128        60
OIR    2025250     60200   17.1400  143.1000      10.5        81       132        60
OIR    2025250     60200   17.1400  143.0800      10.6        82       132        60
OIR    2025250     60200   17.1400  143.0600      10.7        82       119        60
OIR    2025250     60200   17.1400  143.0400      10.8        83       115        60
OIR    2025250     60200   17.1400  143.0200      11.2        87       111        60
OIR    2025250     60200   17.1400  143.0000      11.5        90       119        60
OIR    2025250     60200   17.1400  142.9800      11.8        93       115        60
OIR    2025250     60200   17.1400  142.9600      12.1        95       115        60
OIR    2025250     60200   17.1400  142.9400      12.3        96       119        60
OIR    2025250     60200   17.1400  142.9200      12.5       100       119        60
OIR    2025250     60200   17.1400  142.9000      12.9       103       123        60
OIR    2025250     60200   17.1400  142.8800      13.3       107       128        60
OIR    2025250     60200   17.1400  142.8600      13.4       110       119        60
OIR    2025250     60200   17.1400  142.8400      13.5       112       119        60
OIR    2025250     60200   17.1400  142.8200      13.6       115       128        60
OIR    2025250     60200   17.1400  142.8000      13.7       119       128        60
OIR    2025250     60200   17.1400  142.7800      13.9       122       123        60
OIR    2025250     60200   17.1400  142.7600      14.0       124       132        60
OIR    2025250     60200   17.1400  142.7200      14.0       124       132        60
OIR    2025250     60200   17.1400  142.7000      13.9       123       132        60
OIR    2025250     60200   17.1400  142.5800      11.2       120       136        60
OIR    2025250     60200   17.1200  143.1200      10.4        80       119        60
OIR    2025250     60200   17.1200  143.1000      10.5        81       123        60
OIR    2025250     60200   17.1200  143.0800      10.7        81       123        60
OIR    2025250     60200   17.1200  143.0600      10.8        82       123        60
OIR    2025250     60200   17.1200  143.0400      11.0        83       115        60
OIR    2025250     60200   17.1200  143.0200      11.3        85       111        60
OIR    2025250     60200   17.1200  143.0000      11.6        87       119        60
OIR    2025250     60200   17.1200  142.9800      11.7        89       115        60
OIR    2025250     60200   17.1200  142.9600      12.1        92       111        60
OIR    2025250     60200   17.1200  142.9400      12.4        94       115        60
OIR    2025250     60200   17.1200  142.9200      12.6        97       111        60
OIR    2025250     60200   17.1200  142.9000      13.0       104       123        60
OIR    2025250     60200   17.1200  142.8800      13.3       111       128        60
OIR    2025250     60200   17.1200  142.8600      13.7       116       119        60
OIR    2025250     60200   17.1200  142.8400      14.0       119       123        60
OIR    2025250     60200   17.1200  142.8200      14.0       121       136        60
OIR    2025250     60200   17.1200  142.8000      13.9       122       136        60
OIR    2025250     60200   17.1200  142.7800      14.0       124       132        60
OIR    2025250     60200   17.1200  142.7600      14.0       124       132        60
OIR    2025250     60200   17.1200  142.7400      14.0       125       140        60
OIR    2025250     60200   17.1200  142.7200      14.0       126       132        60
OIR    2025250     60200   17.1200  142.7000      13.9       126       136        60
OIR    2025250     60200   17.1200  142.6800      13.4       125       132        60
OIR    2025250     60200   17.1200  142.6600      12.9       122       136        60
OIR    2025250     60200   17.1000  143.1400      10.3        80       132        60
OIR    2025250     60200   17.1000  143.1200      10.5        80       123        60
OIR    2025250     60200   17.1000  143.1000      10.6        80       128        60
OIR    2025250     60200   17.1000  143.0800      10.8        81       119        60
OIR    2025250     60200   17.1000  143.0600      11.0        82       115        60
OIR    2025250     60200   17.1000  143.0400      11.1        82       119        60
OIR    2025250     60200   17.1000  143.0200      11.4        84       115        60
OIR    2025250     60200   17.1000  143.0000      11.5        85       119        60
OIR    2025250     60200   17.1000  142.9800      11.6        86       119        60
OIR    2025250     60200   17.1000  142.9600      12.0        88       119        60
OIR    2025250     60200   17.1000  142.9400      12.4        91       128        60
OIR    2025250     60200   17.1000  142.9200      12.7        96       123        60
OIR    2025250     60200   17.1000  142.9000      13.3       109       119        60
OIR    2025250     60200   17.1000  142.8800      13.8       116       123        60
OIR    2025250     60200   17.1000  142.8600      14.2       121       128        60
OIR    2025250     60200   17.1000  142.8400      14.1       122       128        60
OIR    2025250     60200   17.1000  142.8200      14.0       122       132        60
OIR    2025250     60200   17.1000  142.8000      14.0       122       128        60
OIR    2025250     60200   17.1000  142.7800      13.9       123       132        60
OIR    2025250     60200   17.1000  142.7600      14.0       124       128        60
OIR    2025250     60200   17.1000  142.7400      14.0       125       132        60
OIR    2025250     60200   17.1000  142.7200      14.0       126       128        60
OIR    2025250     60200   17.1000  142.7000      13.8       128       136        60
OIR    2025250     60200   17.1000  142.6800      13.5       128       119        60
OIR    2025250     60200   17.1000  142.6600      13.0       129       128        60
OIR    2025250     60200   17.1000  142.6400      12.4       130       128        60
OIR    2025250     60200   17.1000  142.6200      11.7       132       140        60
OIR    2025250     60200   17.1000  142.6000      11.2       134       132        60
OIR    2025250     60200   17.1000  142.5800      11.0       139       132        60
OIR    2025250     60200   17.1000  142.5600      11.4       146       132        60
OIR    2025250     60200   17.1000  142.5400      12.1       153       128        60
OIR    2025250     60200   17.1000  142.5200      12.8       156       132        60
OIR    2025250     60200   17.1000  142.5000      13.1       158       132        60
OIR    2025250     60200   17.1000  142.4800      13.1       158       132        60
OIR    2025250     60200   17.1000  142.4600      13.0       159       140        60
OIR    2025250     60200   17.0800  143.1400      10.4        79       128        60
OIR    2025250     60200   17.0800  143.1200      10.5        80       132        60
OIR    2025250     60200   17.0800  143.1000      10.6        80       119        60
OIR    2025250     60200   17.0800  143.0800      10.8        81       115        60
OIR    2025250     60200   17.0800  143.0600      11.0        81       123        60
OIR    2025250     60200   17.0800  143.0400      11.1        82       119        60
OIR    2025250     60200   17.0800  143.0200      11.3        83       119        60
OIR    2025250     60200   17.0800  143.0000      11.4        84       128        60
OIR    2025250     60200   17.0800  142.9800      11.5        83       128        60
OIR    2025250     60200   17.0800  142.9600      11.7        83       123        60
OIR    2025250     60200   17.0800  142.9400      12.5        92       128        60
OIR    2025250     60200   17.0800  142.9200      13.0       101       132        60
OIR    2025250     60200   17.0800  142.9000      13.6       110       111        60
OIR    2025250     60200   17.0800  142.8800      13.8       116       132        60
OIR    2025250     60200   17.0800  142.8600      13.9       118       136        60
OIR    2025250     60200   17.0800  142.8400      14.0       120       136        60
OIR    2025250     60200   17.0800  142.8200      14.0       122       132        60
OIR    2025250     60200   17.0800  142.8000      14.0       122       136        60
OIR    2025250     60200   17.0800  142.7800      13.9       123       136        60
OIR    2025250     60200   17.0800  142.7600      13.9       124       140        60
OIR    2025250     60200   17.0800  142.7400      13.9       125       132        60
OIR    2025250     60200   17.0800  142.7200      13.9       126       132        60
OIR    2025250     60200   17.0800  142.7000      13.6       129       119        60
OIR    2025250     60200   17.0800  142.6800      13.4       130       128        60
OIR    2025250     60200   17.0800  142.6600      12.9       131       128        60
OIR    2025250     60200   17.0800  142.6400      12.4       134       128        60
OIR    2025250     60200   17.0800  142.6200      11.8       140       123        60
OIR    2025250     60200   17.0800  142.6000      11.5       145       123        60
OIR    2025250     60200   17.0800  142.5800      11.6       149       123        60
OIR    2025250     60200   17.0800  142.5600      12.1       155       123        60
OIR    2025250     60200   17.0800  142.5400      12.6       158       119        60
OIR    2025250     60200   17.0800  142.5200      12.9       160       123        60
OIR    2025250     60200   17.0800  142.5000      13.2       162       128        60
OIR    2025250     60200   17.0800  142.4800      13.3       163       128        60
OIR    2025250     60200   17.0800  142.4600      13.4       163       140        60
OIR    2025250     60200   17.0800  142.4400      13.4       163       136        60
OIR    2025250     60200   17.0800  142.4200      13.2       161       140        60
OIR    2025250     60200   17.0600  143.1400      10.3        79       136        60
OIR    2025250     60200   17.0600  143.1200      10.5        80       132        60
OIR    2025250     60200   17.0600  143.1000      10.6        80       128        60
OIR    2025250     60200   17.0600  143.0800      10.8        80       115        60
OIR    2025250     60200   17.0600  143.0600      11.0        81       128        60
OIR    2025250     60200   17.0600  143.0400      11.1        81       115        60
OIR    2025250     60200   17.0600  143.0200      11.3        83       123        60
OIR    2025250     60200   17.0600  143.0000      11.3        83       132        60
OIR    2025250     60200   17.0600  142.9800      11.3        83       128        60
OIR    2025250     60200   17.0600  142.8000      13.8       123       136        60
OIR    2025250     60200   17.0600  142.7800      13.9       124       132        60
OIR    2025250     60200   17.0600  142.7600      13.9       124       111        60
OIR    2025250     60200   17.0600  142.7400      13.9       124       119        60
OIR    2025250     60200   17.0600  142.7200      13.8       126       136        60
OIR    2025250     60200   17.0600  142.7000      13.6       130       123        60
OIR    2025250     60200   17.0600  142.6800      13.2       132       115        60
OIR    2025250     60200   17.0600  142.6600      12.8       133       119        60
OIR    2025250     60200   17.0600  142.6400      12.4       137       115        60
OIR    2025250     60200   17.0600  142.6200      11.9       146       123        60
OIR    2025250     60200   17.0600  142.6000      11.9       153       115        60
OIR    2025250     60200   17.0600  142.5800      12.2       158       115        60
OIR    2025250     60200   17.0600  142.5600      12.7       161       115        60
OIR    2025250     60200   17.0600  142.5400      12.9       162       115        60
OIR    2025250     60200   17.0600  142.5200      13.1       163       115        60
OIR    2025250     60200   17.0600  142.5000      13.3       163       115        60
OIR    2025250     60200   17.0600  142.4800      13.4       164       119        60
OIR    2025250     60200   17.0600  142.4600      13.5       164       119        60
OIR    2025250     60200   17.0600  142.4400      13.5       164       136        60
OIR    2025250     60200   17.0400  143.1600       9.5        75       132        60
OIR    2025250     60200   17.0400  143.1400      10.0        77       119        60
OIR    2025250     60200   17.0400  143.1200      10.1        77       115        60
OIR    2025250     60200   17.0400  143.1000      10.2        76       115        60
OIR    2025250     60200   17.0400  143.0800      10.3        75       123        60
OIR    2025250     60200   17.0400  143.0600      10.3        74       119        60
OIR    2025250     60200   17.0400  143.0400      10.9        81       123        60
OIR    2025250     60200   17.0400  143.0200      10.8        81       128        60
OIR    2025250     60200   17.0400  143.0000      11.0        83       123        60
OIR    2025250     60200   17.0400  142.9600      11.2        87       128        60
OIR    2025250     60200   17.0400  142.7800      13.9       124       136        60
OIR    2025250     60200   17.0400  142.7600      13.9       124       132        60
OIR    2025250     60200   17.0400  142.7400      13.9       124       128        60
OIR    2025250     60200   17.0400  142.7200      13.5       126       123        60
OIR    2025250     60200   17.0400  142.7000      13.2       132       123        60
OIR    2025250     60200   17.0400  142.6800      12.9       136       115        60
OIR    2025250     60200   17.0400  142.6600      12.5       139       115        60
OIR    2025250     60200   17.0400  142.6400      12.3       143       115        60
OIR    2025250     60200   17.0400  142.6200      12.2       153       119        60
OIR    2025250     60200   17.0400  142.6000      12.5       159       115        60
OIR    2025250     60200   17.0400  142.5800      12.8       163       115        60
OIR    2025250     60200   17.0400  142.5600      13.0       164       119        60
OIR    2025250     60200   17.0400  142.5400      13.1       164       115        60
OIR    2025250     60200   17.0400  142.5200      13.2       164       123        60
OIR    2025250     60200   17.0400  142.5000      13.3       164       123        60
OIR    2025250     60200   17.0400  142.4800      13.4       165       123        60
OIR    2025250     60200   17.0400  142.4600      13.5       165       128        60
OIR    2025250     60200   17.0400  142.4400      13.6       165       119        60
OIR    2025250     60200   17.0400  142.4200      13.6       165       132        60
OIR    2025250     60200   17.0400  142.4000      13.5       165       132        60
OIR    2025250     60200   17.0400  142.3800      13.4       164       136        60
OIR    2025250     60200   17.0200  143.1600       8.8        69       132        60
OIR    2025250     60200   17.0200  143.1400       9.2        71       123        60
OIR    2025250     60200   17.0200  143.1200       9.3        69       123        60
OIR    2025250     60200   17.0200  143.1000       9.6        68       132        60
OIR    2025250     60200   17.0200  143.0800       9.7        66       123        60
OIR    2025250     60200   17.0200  143.0200      10.5        85       136        60
OIR    2025250     60200   17.0200  142.7400      13.8       124       136        60
OIR    2025250     60200   17.0200  142.7200      13.3       129       132        60
OIR    2025250     60200   17.0200  142.7000      13.0       136       140        60
OIR    2025250     60200   17.0200  142.6800      12.9       140       132        60
OIR    2025250     60200   17.0200  142.6600      12.6       145       128        60
OIR    2025250     60200   17.0200  142.6400      12.7       151       123        60
OIR    2025250     60200   17.0200  142.6200      12.8       159       128        60
OIR    2025250     60200   17.0200  142.6000      13.0       163       119        60
OIR    2025250     60200   17.0200  142.5800      13.0       164       123        60
OIR    2025250     60200   17.0200  142.5600      13.1       165       115        60
OIR    2025250     60200   17.0200  142.5400      13.1       165       123        60
OIR    2025250     60200   17.0200  142.5200      13.2       165       119        60
OIR    2025250     60200   17.0200  142.5000      13.3       166       115        60
OIR    2025250     60200   17.0200  142.4800      13.5       167       128        60
OIR    2025250     60200   17.0200  142.4600      13.6       167       128        60
OIR    2025250     60200   17.0200  142.4400      13.6       168       123        60
OIR    2025250     60200   17.0200  142.4200      13.7       168       136        60
OIR    2025250     60200   17.0200  142.4000      13.7       168       140        60
OIR    2025250     60200   17.0200  142.3800      13.6       167       136        60
OIR    2025250     60200   17.0200  142.3600      13.4       166       140        60
OIR    2025250     60200   17.0000  143.1600       7.9        60       132        60
OIR    2025250     60200   17.0000  143.1400       8.5        62       123        60
OIR    2025250     60200   17.0000  143.1200       9.0        64       128        60
OIR    2025250     60200   17.0000  143.1000       9.5        65       123        60
OIR    2025250     60200   17.0000  143.0800       9.6        65       132        60
OIR    2025250     60200   17.0000  142.7000      13.0       137       140        60
OIR    2025250     60200   17.0000  142.6800      12.9       142       136        60
OIR    2025250     60200   17.0000  142.6600      12.7       152       132        60
OIR    2025250     60200   17.0000  142.6400      13.0       159       140        60
OIR    2025250     60200   17.0000  142.6200      13.1       162       136        60
OIR    2025250     60200   17.0000  142.6000      13.1       164       123        60
OIR    2025250     60200   17.0000  142.5800      13.1       165       115        60
OIR    2025250     60200   17.0000  142.5600      13.1       165       123        60
OIR    2025250     60200   17.0000  142.5400      13.2       166       115        60
OIR    2025250     60200   17.0000  142.5200      13.3       166       119        60
OIR    2025250     60200   17.0000  142.5000      13.4       167       123        60
OIR    2025250     60200   17.0000  142.4800      13.5       167       115        60
OIR    2025250     60200   17.0000  142.4600      13.5       168       123        60
OIR    2025250     60200   17.0000  142.4400      13.6       170       128        60
OIR    2025250     60200   17.0000  142.4200      13.7       171       132        60
OIR    2025250     60200   17.0000  142.4000      13.8       172       140        60
OIR    2025250     60200   17.0000  142.3600      13.4       170       140        60
OIR    2025250     60200   17.0000  142.3400      13.2       169       144        60
OIR    2025250     60200   16.9800  143.1400       8.0        53       132        60
OIR    2025250     60200   16.9800  143.1200       8.7        57       136        60
OIR    2025250     60200   16.9800  143.1000       9.4        62       136        60
OIR    2025250     60200   16.9800  142.6600      12.8       160       136        60
OIR    2025250     60200   16.9800  142.6400      13.1       163       140        60
OIR    2025250     60200   16.9800  142.6200      13.1       164       132        60
OIR    2025250     60200   16.9800  142.6000      13.1       164       132        60
OIR    2025250     60200   16.9800  142.5800      13.2       165       119        60
OIR    2025250     60200   16.9800  142.5600      13.1       166       119        60
OIR    2025250     60200   16.9800  142.5400      13.2       166       128        60
OIR    2025250     60200   16.9800  142.5200      13.2       167       123        60
OIR    2025250     60200   16.9800  142.5000      13.5       169       119        60
OIR    2025250     60200   16.9800  142.4800      13.6       171       123        60
OIR    2025250     60200   16.9800  142.4600      13.8       174       119        60
OIR    2025250     60200   16.9800  142.4400      13.9       176       115        60
OIR    2025250     60200   16.9800  142.4200      13.9       176       128        60
OIR    2025250     60200   16.9800  142.4000      13.7       174       140        60
OIR    2025250     60200   16.9800  142.3800      13.6       173       140        60
OIR    2025250     60200   16.9800  142.3600      13.4       172       136        60
OIR    2025250     60200   16.9800  142.3400      13.3       171       140        60
OIR    2025250     60200   16.9600  143.1000       9.3        57       132        60
OIR    2025250     60200   16.9600  142.6200      13.1       164       140        60
OIR    2025250     60200   16.9600  142.5800      13.2       166       140        60
OIR    2025250     60200   16.9600  142.5600      13.2       166       123        60
OIR    2025250     60200   16.9600  142.5400      13.2       167       128        60
OIR    2025250     60200   16.9600  142.5200      13.2       169       123        60
OIR    2025250     60200   16.9600  142.5000      13.4       171       119        60
OIR    2025250     60200   16.9600  142.4800      13.7       176       115        60
OIR    2025250     60200   16.9600  142.4600      14.1       181       128        60
OIR    2025250     60200   16.9600  142.4400      14.3       184       132        60
OIR    2025250     60200   16.9600  142.4200      14.6       185       132        60
OIR    2025250     60200   16.9600  142.4000      14.2       183       132        60
OIR    2025250     60200   16.9600  142.3800      13.7       178       140        60
OIR    2025250     60200   16.9600  142.3400      13.4       174       136        60
OIR    2025250     60200   16.9400  142.6000      13.1       165       140        60
OIR    2025250     60200   16.9400  142.5800      13.1       166       132        60
OIR    2025250     60200   16.9400  142.5600      13.2       167       128        60
OIR    2025250     60200   16.9400  142.5400      13.2       168       123        60
OIR    2025250     60200   16.9400  142.5200      13.3       172       123        60
OIR    2025250     60200   16.9400  142.5000      13.4       176       119        60
OIR    2025250     60200   16.9400  142.4800      13.6       181       119        60
OIR    2025250     60200   16.9400  142.4600      14.0       185       123        60
OIR    2025250     60200   16.9400  142.4400      14.4       188       115        60
OIR    2025250     60200   16.9400  142.4200      14.5       188       115        60
OIR    2025250     60200   16.9400  142.4000      14.6       189       119        60
OIR    2025250     60200   16.9400  142.3800      14.2       185       115        60
OIR    2025250     60200   16.9400  142.3600      13.5       177       132        60
OIR    2025250     60200   16.9400  142.3400      13.5       176       128        60
OIR    2025250     60200   16.9400  142.3200      13.5       175       132        60
OIR    2025250     60200   16.9200  142.5600      13.2       169       136        60
OIR    2025250     60200   16.9200  142.5400      13.3       172       140        60
OIR    2025250     60200   16.9200  142.5200      13.4       177       128        60
OIR    2025250     60200   16.9200  142.5000      13.4       182       128        60
OIR    2025250     60200   16.9200  142.4800      13.6       185       136        60
OIR    2025250     60200   16.9200  142.4600      14.0       188       128        60
OIR    2025250     60200   16.9200  142.4400      14.3       191       132        60
OIR    2025250     60200   16.9200  142.4200      14.4       192       123        60
OIR    2025250     60200   16.9200  142.4000      14.5       192       136        60
OIR    2025250     60200   16.9200  142.3800      14.5       191       132        60
OIR    2025250     60200   16.9200  142.3600      14.0       184       132        60
OIR    2025250     60200   16.9200  142.3200      13.5       175       140        60
OIR    2025250     60200   16.9000  142.6000      13.3       169       136        60
OIR    2025250     60200   16.9000  142.5600      13.5       177       144        60
OIR    2025250     60200   16.9000  142.5400      13.5       178       132        60
OIR    2025250     60200   16.9000  142.5200      13.5       182       128        60
OIR    2025250     60200   16.9000  142.5000      13.6       186       132        60
OIR    2025250     60200   16.9000  142.4800      13.8       189       140        60
OIR    2025250     60200   16.9000  142.4600      14.0       192       132        60
OIR    2025250     60200   16.9000  142.4400      14.2       193       136        60
OIR    2025250     60200   16.9000  142.4200      14.4       193       136        60
OIR    2025250     60200   16.9000  142.4000      14.4       193       140        60
OIR    2025250     60200   16.9000  142.3800      14.5       192       136        60
OIR    2025250     60200   16.9000  142.3600      14.4       189       140        60
OIR    2025250     60200   16.8800  142.5800      13.5       179       119        60
OIR    2025250     60200   16.8800  142.5600      13.7       182       140        60
OIR    2025250     60200   16.8800  142.5400      13.8       184       132        60
OIR    2025250     60200   16.8800  142.5200      13.8       186       136        60
OIR    2025250     60200   16.8800  142.5000      13.9       189       136        60
OIR    2025250     60200   16.8800  142.4800      13.9       192       132        60
OIR    2025250     60200   16.8800  142.4600      14.1       194       136        60
OIR    2025250     60200   16.8800  142.4400      14.2       194       132        60
OIR    2025250     60200   16.8800  142.4200      14.3       194       132        60
OIR    2025250     60200   16.8800  142.4000      14.3       194       140        60
OIR    2025250     60200   16.8800  142.3400      13.7       182       136        60
OIR    2025250     60200   16.8600  142.5800      13.8       184       140        60
OIR    2025250     60200   16.8600  142.5600      13.9       187       136        60
OIR    2025250     60200   16.8600  142.5400      14.0       188       136        60
OIR    2025250     60200   16.8600  142.5200      14.0       190       128        60
OIR    2025250     60200   16.8600  142.5000      14.0       192       132        60
OIR    2025250     60200   16.8600  142.4800      14.1       194       136        60
OIR    2025250     60200   16.8600  142.4600      14.1       195       136        60
OIR    2025250     60200   16.8600  142.4400      14.2       195       136        60
OIR    2025250     60200   16.8600  142.4200      14.2       195       132        60
OIR    2025250     60200   16.8600  142.4000      14.2       194       136        60
OIR    2025250     60200   16.8600  142.3400      13.7       184       140        60
OIR    2025250     60200   16.8600  142.3000      13.4       179       144        60
OIR    2025250     60200   16.8400  142.5600      14.1       192       140        60
OIR    2025250     60200   16.8400  142.5400      14.0       193       136        60
OIR    2025250     60200   16.8400  142.5200      14.0       194       119        60
OIR    2025250     60200   16.8400  142.5000      14.0       194       132        60
OIR    2025250     60200   16.8400  142.4800      14.1       195       128        60
OIR    2025250     60200   16.8400  142.4600      14.1       196       140        60
OIR    2025250     60200   16.8400  142.4400      14.1       196       132        60
OIR    2025250     60200   16.8400  142.4200      14.1       195       136        60
OIR    2025250     60200   16.8400  142.4000      14.1       195       128        60
OIR    2025250     60200   16.8400  142.3800      14.0       194       140        60
OIR    2025250     60200   16.8200  142.5200      14.0       195       119        60
OIR    2025250     60200   16.8200  142.5000      14.0       195       119        60
OIR    2025250     60200   16.8200  142.4800      14.1       196       136        60
OIR    2025250     60200   16.8200  142.4600      14.1       196       136        60
OIR    2025250     60200   16.8200  142.4400      14.1       196       128        60
OIR    2025250     60200   16.8200  142.4200      14.1       196       136        60
OIR    2025250     60200   16.8200  142.4000      14.0       195       140        60
OIR    2025250     60200   16.8000  142.5200      13.1       197       132        60
OIR    2025250     60200   16.8000  142.5000      14.0       197       132        60
OIR    2025250     60200   16.8000  142.4800      14.1       196       132        60
OIR    2025250     60200   16.8000  142.4600      14.1       196       123        60
OIR    2025250     60200   16.8000  142.4400      14.1       197       128        60
OIR    2025250     60200   16.8000  142.4200      13.9       196       123        60
OIR    2025250     60200   16.8000  142.4000      13.8       196       128        60
OIR    2025250     60200   16.8000  142.3800      13.7       194       136        60
OIR    2025250     60200   16.7800  142.5200      12.3       201       136        60
OIR    2025250     60200   16.7800  142.5000      13.7       199       119        60
OIR    2025250     60200   16.7800  142.4800      14.0       198       115        60
OIR    2025250     60200   16.7800  142.4600      14.0       197       128        60
OIR    2025250     60200   16.7800  142.4400      14.0       197       132        60
OIR    2025250     60200   16.7800  142.4200      13.8       196       128        60
OIR    2025250     60200   16.7800  142.4000      13.6       195       144        60
OIR    2025250     60200   16.7800  142.3800      13.5       194       140        60
OIR    2025250     60200   16.7800  142.3600      13.3       191       140        60
OIR    2025250     60200   16.7600  142.6000      11.5       206       140        60
OIR    2025250     60200   16.7600  142.5800      11.6       207       140        60
OIR    2025250     60200   16.7600  142.5200      11.7       208       136        60
OIR    2025250     60200   16.7600  142.5000      11.9       206       123        60
OIR    2025250     60200   16.7600  142.4800      13.3       205       132        60
OIR    2025250     60200   16.7600  142.4600      13.4       201       132        60
OIR    2025250     60200   16.7600  142.4400      13.6       200       128        60
OIR    2025250     60200   16.7600  142.4200      13.5       197       132        60
OIR    2025250     60200   16.7600  142.4000      13.3       195       132        60
OIR    2025250     60200   16.7600  142.3800      13.2       194       136        60
OIR    2025250     60200   16.7400  142.6400      11.1       205       123        60
OIR    2025250     60200   16.7400  142.6000      11.3       208       136        60
OIR    2025250     60200   16.7400  142.5800      11.3       209       136        60
OIR    2025250     60200   16.7400  142.5600      11.3       209       128        60
OIR    2025250     60200   16.7400  142.5400      11.3       209       132        60
OIR    2025250     60200   16.7400  142.5200      11.4       210       140        60
OIR    2025250     60200   16.7400  142.5000      11.4       210       136        60
OIR    2025250     60200   16.7400  142.4800      12.1       210       144        60
OIR    2025250     60200   16.7400  142.4600      12.6       206       119        60
OIR    2025250     60200   16.7400  142.4400      12.5       202       119        60
OIR    2025250     60200   16.7400  142.4200      12.7       198       128        60
OIR    2025250     60200   16.7400  142.4000      12.9       195       132        60
OIR    2025250     60200   16.7200  142.6000      11.3       209       136        60
OIR    2025250     60200   16.7200  142.5800      11.3       209       136        60
OIR    2025250     60200   16.7200  142.5600      11.3       209       132        60
OIR    2025250     60200   16.7200  142.5400      11.3       209       132        60
OIR    2025250     60200   16.7200  142.5200      11.3       210       128        60
OIR    2025250     60200   16.7200  142.5000      11.3       210       128        60
OIR    2025250     60200   16.7200  142.4800      11.4       210       132        60
OIR    2025250     60200   16.7200  142.4600      11.8       209       136        60
OIR    2025250     60200   16.7200  142.4400      11.8       205       140        60
OIR    2025250     60200   16.7200  142.4200      11.7       200       132        60
OIR    2025250     60200   16.7200  142.4000      11.8       197       136        60
OIR    2025250     60200   16.7000  142.6200      11.0       211       140        60
OIR    2025250     60200   16.7000  142.6000      11.1       210       136        60
OIR    2025250     60200   16.7000  142.5800      11.3       209       132        60
OIR    2025250     60200   16.7000  142.5600      11.2       209       132        60
OIR    2025250     60200   16.7000  142.5400      11.2       209       136        60
OIR    2025250     60200   16.7000  142.5200      11.3       210       128        60
OIR    2025250     60200   16.7000  142.5000      11.3       210       123        60
OIR    2025250     60200   16.7000  142.4800      11.3       210       128        60
OIR    2025250     60200   16.7000  142.4600      11.3       209       123        60
OIR    2025250     60200   16.7000  142.4400      11.4       206       140        60
OIR    2025250     60200   16.7000  142.4200      11.3       203       136        60
OIR    2025250     60200   16.7000  142.4000      11.4       199       128        60
OIR    2025250     60200   16.7000  142.3800      11.8       194       132        60
OIR    2025250     60200   16.6800  142.6800      10.5       216       140        60
OIR    2025250     60200   16.6800  142.6600      10.6       215       140        60
OIR    2025250     60200   16.6800  142.6000      11.0       212       128        60
OIR    2025250     60200   16.6800  142.5800      11.0       210       140        60
OIR    2025250     60200   16.6800  142.5600      11.1       209       140        60
OIR    2025250     60200   16.6800  142.5400      11.1       209       132        60
OIR    2025250     60200   16.6800  142.5200      11.1       209       132        60
OIR    2025250     60200   16.6800  142.5000      11.1       210       123        60
OIR    2025250     60200   16.6800  142.4800      11.1       209       111        60
OIR    2025250     60200   16.6800  142.4600      11.1       208       128        60
OIR    2025250     60200   16.6800  142.4200      11.1       205       144        60
OIR    2025250     60200   16.6800  142.4000      11.2       200       128        60
OIR    2025250     60200   16.6800  142.3800      11.6       195       144        60
OIR    2025250     60200   16.6600  142.6800      10.6       218       144        60
OIR    2025250     60200   16.6600  142.6200      10.8       216       144        60
OIR    2025250     60200   16.6600  142.5600      11.0       210       140        60
OIR    2025250     60200   16.6600  142.5400      11.1       209       136        60
OIR    2025250     60200   16.6600  142.5200      11.0       209       132        60
OIR    2025250     60200   16.6600  142.5000      11.0       209       111        60
OIR    2025250     60200   16.6600  142.4800      11.0       208       119        60
OIR    2025250     60200   16.6600  142.4600      11.0       208       123        60
OIR    2025250     60200   16.6600  142.4400      11.0       207       140        60
OIR    2025250     60200   16.6400  142.7000      10.6       222       144        60
OIR    2025250     60200   16.6400  142.6600      10.8       218       140        60
OIR    2025250     60200   16.6400  142.6400      10.8       217       140        60
OIR    2025250     60200   16.6400  142.6200      10.8       217       140        60
OIR    2025250     60200   16.6400  142.6000      10.6       219       132        60
OIR    2025250     60200   16.6400  142.5600      10.6       215       140        60
OIR    2025250     60200   16.6400  142.5400      10.8       211       128        60
OIR    2025250     60200   16.6400  142.5200      11.0       209       132        60
OIR    2025250     60200   16.6400  142.5000      11.0       209       128        60
OIR    2025250     60200   16.6400  142.4800      11.0       208       123        60
OIR    2025250     60200   16.6400  142.4600      11.0       208       136        60
OIR    2025250     60200   16.6200  142.6800      11.1       221       140        60
OIR    2025250     60200   16.6200  142.6600      11.1       218       140        60
OIR    2025250     60200   16.6200  142.6400      11.0       218       140        60
OIR    2025250     60200   16.6200  142.6200      10.9       218       144        60
OIR    2025250     60200   16.6200  142.6000      10.4       222       132        60
OIR    2025250     60200   16.6200  142.5800      10.2       224       128        60
OIR    2025250     60200   16.6200  142.5600      10.3       222       136        60
OIR    2025250     60200   16.6200  142.5400      10.5       218       144        60
OIR    2025250     60200   16.6200  142.5200      11.0       215       136        60
OIR    2025250     60200   16.6200  142.5000      11.0       213       128        60
OIR    2025250     60200   16.6200  142.4800      11.0       210       128        60
OIR    2025250     60200   16.6000  142.6800      11.7       224       140        60
OIR    2025250     60200   16.6000  142.6400      11.3       218       140        60
OIR    2025250     60200   16.6000  142.6200      11.1       221       140        60
OIR    2025250     60200   16.6000  142.6000      10.4       225       136        60
OIR    2025250     60200   16.6000  142.5800      10.2       225       128        60
OIR    2025250     60200   16.6000  142.5600      10.3       226       128        60
OIR    2025250     60200   16.6000  142.5400      10.4       223       115        60
OIR    2025250     60200   16.6000  142.5200      11.1       221       132        60
OIR    2025250     60200   16.6000  142.5000      11.0       217       132        60
OIR    2025250     60200   16.6000  142.4800      10.9       212       132        60
OIR    2025250     60200   16.6000  142.4600      10.9       208       144        60
OIR    2025250     60200   16.5800  142.6600      11.8       221       144        60
OIR    2025250     60200   16.5800  142.6400      11.4       220       140        60
OIR    2025250     60200   16.5800  142.6200      10.9       230       136        60
OIR    2025250     60200   16.5800  142.6000      10.5       229       128        60
OIR    2025250     60200   16.5800  142.5800      10.2       227       123        60
OIR    2025250     60200   16.5800  142.5600      10.4       229       136        60
OIR    2025250     60200   16.5800  142.5400      10.5       226       128        60
OIR    2025250     60200   16.5800  142.5200      11.0       226       128        60
OIR    2025250     60200   16.5800  142.5000      11.1       222       128        60
OIR    2025250     60200   16.5600  142.7000      11.6       241       140        60
OIR    2025250     60200   16.5600  142.6600      11.1       236       140        60
OIR    2025250     60200   16.5600  142.6400      11.1       236       140        60
OIR    2025250     60200   16.5600  142.6200      11.0       234       132        60
OIR    2025250     60200   16.5600  142.6000      10.7       233       128        60
OIR    2025250     60200   16.5600  142.5800      10.8       237       123        60
OIR    2025250     60200   16.5600  142.5600      10.7       234       136        60
OIR    2025250     60200   16.5600  142.5400      10.8       230       144        60
OIR    2025250     60200   16.5600  142.5200      11.0       228       132        60
OIR    2025250     60200   16.5600  142.5000      11.1       226       136        60
OIR    2025250     60200   16.5400  142.6600      10.9       239       144        60
OIR    2025250     60200   16.5400  142.6400      11.0       237       132        60
OIR    2025250     60200   16.5400  142.6200      10.9       237       132        60
OIR    2025250     60200   16.5400  142.6000      10.9       238       123        60
OIR    2025250     60200   16.5400  142.5800      10.9       237       128        60
OIR    2025250     60200   16.5400  142.5600      10.8       237       132        60
OIR    2025250     60200   16.5400  142.5400      10.9       236       144        60
OIR    2025250     60200   16.5400  142.5200      10.8       233       136        60
OIR    2025250     60200   16.5400  142.5000      10.8       230       119        60
OIR    2025250     60200   16.5400  142.4800      10.8       221       144        60
OIR    2025250     60200   16.5200  142.6600      10.5       242       136        60
OIR    2025250     60200   16.5200  142.6400      10.7       238       128        60
OIR    2025250     60200   16.5200  142.6200      10.8       238       132        60
OIR    2025250     60200   16.5200  142.6000      10.9       238       132        60
OIR    2025250     60200   16.5200  142.5800      10.9       237       132        60
OIR    2025250     60200   16.5200  142.5200      10.7       235       136        60
OIR    2025250     60200   16.5200  142.5000      10.6       232       132        60
OIR    2025250     60200   16.5200  142.4800      10.6       224       144        60
OIR    2025250     60200   16.5000  142.6400      10.4       240       132        60
OIR    2025250     60200   16.5000  142.6200      10.7       238       144        60
OIR    2025250     60200   16.5000  142.6000      10.8       237       140        60
OIR    2025250     60200   16.5000  142.5800      10.8       237       136        60
OIR    2025250     60200   16.5000  142.5000      10.6       235       140        60
OIR    2025250     60200   16.4800  142.6600       9.9       247       140        60
