type     day        hms     lat       lon         spd        dir       pre        qi
IR     2025250    183200   23.7700  151.8700       5.5        90       988        67
IR     2025250    183200   23.6600  149.9300       6.0        83       953        83
IR     2025250    183200   23.6800  149.8300       6.1        81       963        94
IR     2025250    183200   23.6800  149.7800       6.1        82       962        93
IR     2025250    183200   23.7200  149.6800       5.4       106       952        82
IR     2025250    183200   23.6500  149.5500       8.6       134       920        73
IR     2025250    183200   23.6900  149.4100       7.9       132       863        88
IR     2025250    183200   23.6900  149.3900       7.8       131       861        88
IR     2025250    183200   23.6400  147.6500       8.7       111       909        65
IR     2025250    183200   23.6400  147.5500       9.9       107       809        63
IR     2025250    183200   23.6400  147.4700      10.2       100       797        66
IR     2025250    183200   23.6400  147.3500       9.3        93       797        60
IR     2025250    183200   23.6200  147.2400       8.7       103       908        78
IR     2025250    183200   23.6400  147.2200       9.7       112       924        78
IR     2025250    183200   23.6100  146.5300       8.2        89       907        84
IR     2025250    183200   23.6100  146.4200       8.5        81       927        75
IR     2025250    183200   23.6500  146.3700       8.9        85       953        69
IR     2025250    183200   23.6300  146.2200       7.2       113       938        82
IR     2025250    183200   23.6000  146.0800       7.5       129       919        79
IR     2025250    183200   23.6900  145.9600       8.9       121       949        75
IR     2025250    183200   23.6600  145.8400       8.7       111       909        80
IR     2025250    183200   23.6000  145.6700       7.9       101       903        85
IR     2025250    183200   23.6800  145.5900       8.4       102       918        94
IR     2025250    183200   23.6200  151.6600       5.1        78       944        76
IR     2025250    183200   23.6200  149.9600       6.0        83       977        67
IR     2025250    183200   23.6400  149.9500       5.9        84       958        83
IR     2025250    183200   23.5900  149.7900       6.4        69       949        85
IR     2025250    183200   23.6100  149.6700       6.2       100       950        87
IR     2025250    183200   23.5500  149.5600       8.1       122       891        87
IR     2025250    183200   23.5700  149.5000       9.1       131       883        79
IR     2025250    183200   23.5400  149.3700       9.0       134       861        63
IR     2025250    183200   23.5400  149.3100       8.0       132       859        68
IR     2025250    183200   23.5200  147.7900       7.1       112       902        61
IR     2025250    183200   23.5800  147.6700       8.3       108       819        65
IR     2025250    183200   23.5800  147.5500      10.2       106       795        61
IR     2025250    183200   23.6000  147.3800       9.8        99       790        76
IR     2025250    183200   23.6000  147.3000       8.3        90       832        63
IR     2025250    183200   23.5900  146.6500       7.8       104       902        64
IR     2025250    183200   23.5900  146.5200       7.9        85       905        79
IR     2025250    183200   23.5900  146.4200       8.3        78       919        70
IR     2025250    183200   23.5200  146.3800       8.7        81       902        79
IR     2025250    183200   23.5000  146.2100       8.1       119       852        66
IR     2025250    183200   23.5400  145.8100       9.9       113       902        84
IR     2025250    183200   23.5600  145.7100       8.1       101       903        77
IR     2025250    183200   23.5600  151.8200       4.5        94       970        67
IR     2025250    183200   23.4900  149.6800       5.7        86       915        80
IR     2025250    183200   23.4600  149.5900       6.4       110       884        95
IR     2025250    183200   23.4800  149.5100       8.3       127       869        66
IR     2025250    183200   23.5200  149.3300       8.4       134       859        72
IR     2025250    183200   23.5200  149.3100       8.0       133       859        73
IR     2025250    183200   23.4200  147.8800       6.8       101       916        93
IR     2025250    183200   23.4800  147.8000       7.3       108       899        70
IR     2025250    183200   23.5000  147.7600       7.0       106       891        64
IR     2025250    183200   23.4200  146.6700       6.9       107       896        73
IR     2025250    183200   23.4200  146.5300       6.8       101       896        78
IR     2025250    183200   23.4000  146.3200       9.9       105       823        83
IR     2025250    183200   23.4300  145.5100       8.9        97       951        66
IR     2025250    183200   23.4100  149.8400       5.6        75       922        89
IR     2025250    183200   23.3600  149.7700       6.0        73       914        66
IR     2025250    183200   23.3800  149.7100       5.9        80       908        72
IR     2025250    183200   23.4200  149.6100       5.9        97       890        91
IR     2025250    183200   23.3400  149.4100       6.8       121       868        76
IR     2025250    183200   23.3600  149.3900       7.0       123       866        82
IR     2025250    183200   23.4000  147.8800       6.8       102       925        91
IR     2025250    183200   23.3100  147.7900       7.5       110       909        71
IR     2025250    183200   23.3600  146.7700       7.0       101       896        69
IR     2025250    183200   23.3000  146.5400       6.4       123       880        60
IR     2025250    183200   23.3600  146.4200       8.7       108       861        65
IR     2025250    183200   23.3800  146.3400       9.5       105       823        84
IR     2025250    183200   23.3800  146.3000      10.2       109       823        89
IR     2025250    183200   23.3100  146.1100       8.3       119       859        68
IR     2025250    183200   23.3700  145.5300       9.3       102       942        74
IR     2025250    183200   23.3600  151.7900       4.5       109       949        66
IR     2025250    183200   23.3400  151.1400       5.4       115       959        62
IR     2025250    183200   23.2800  150.9200       4.2       105       950        82
IR     2025250    183200   23.3300  149.9900       7.7       101       950        85
IR     2025250    183200   23.2400  149.8800       7.0        82       932        75
IR     2025250    183200   23.2600  149.8000       6.6        76       917        79
IR     2025250    183200   23.2800  149.7200       6.0        76       900        60
IR     2025250    183200   23.2800  149.6300       5.6        88       886        68
IR     2025250    183200   23.2800  149.5100       6.3       113       869        69
IR     2025250    183200   23.2300  149.4000       6.3       123       872        83
IR     2025250    183200   23.2200  148.1900       9.8       117       959        82
IR     2025250    183200   23.2400  148.1500       9.8       117       973        73
IR     2025250    183200   23.2300  148.0700       9.9       119       971        76
IR     2025250    183200   23.2300  147.9200       8.5       110       946        83
IR     2025250    183200   23.2700  147.7200       7.6       110       891        67
IR     2025250    183200   23.2300  146.3700      10.0       124       824        72
IR     2025250    183200   23.1900  146.2700      10.6       126       826        86
IR     2025250    183200   23.1900  146.1900      10.5       123       867        87
IR     2025250    183200   23.2100  146.0600       8.4       113       894        71
IR     2025250    183200   23.2700  145.8500       8.5       105       915        60
IR     2025250    183200   23.2500  145.7400       9.5       102       915        69
IR     2025250    183200   23.2100  151.9600       5.1        95       930        86
IR     2025250    183200   23.1900  151.8900       5.3        96       914        76
IR     2025250    183200   23.1900  151.8300       5.4       101       891        71
IR     2025250    183200   23.1900  151.6200       5.4       110       903        75
IR     2025250    183200   23.2000  151.2900       6.0       120       935        66
IR     2025250    183200   23.1600  151.1100       4.9       109       930        72
IR     2025250    183200   23.1800  151.0500       4.6       105       931        85
IR     2025250    183200   23.1400  150.0100       5.8        72       931        67
IR     2025250    183200   23.1400  149.9100       6.7        78       931        82
IR     2025250    183200   23.2000  149.8700       7.1        81       933        78
IR     2025250    183200   23.1800  149.7500       7.4        69       916        82
IR     2025250    183200   23.1500  149.6400       6.7        70       896        73
IR     2025250    183200   23.1500  149.5000       5.8       100       866        70
IR     2025250    183200   23.1700  149.4800       5.9       108       867        68
IR     2025250    183200   23.1900  149.3800       6.3       123       873        81
IR     2025250    183200   23.2000  148.3100       9.4       120       963        65
IR     2025250    183200   23.1100  148.2600       9.9       120       943        90
IR     2025250    183200   23.1900  148.1200      10.5       119       957        81
IR     2025250    183200   23.1100  146.3600      10.3       134       830        82
IR     2025250    183200   23.1700  146.2600      10.4       127       830        85
IR     2025250    183200   23.1700  146.2000      10.3       125       870        86
IR     2025250    183200   23.1700  146.1000       8.6       115       894        89
IR     2025250    183200   23.0700  151.9600       4.4        86       943        86
IR     2025250    183200   23.1300  151.8600       5.1        92       889        79
IR     2025250    183200   23.0900  151.8200       4.9        91       882        73
IR     2025250    183200   23.1200  151.6300       5.4       108       900        60
IR     2025250    183200   23.1000  151.6100       5.4       106       908        65
IR     2025250    183200   23.0600  151.3300       5.7       111       963        90
IR     2025250    183200   23.0800  151.2100       5.3       109       942        75
IR     2025250    183200   23.1000  151.1900       5.3       109       938        72
IR     2025250    183200   23.1000  150.0100       6.2        77       933        73
IR     2025250    183200   23.1200  149.9900       6.0        77       931        73
IR     2025250    183200   23.1200  149.8800       6.9        78       929        82
IR     2025250    183200   23.1100  149.7800       7.8        72       933        76
IR     2025250    183200   23.0300  149.6100       6.4        76       875        85
IR     2025250    183200   23.1100  149.4900       5.7        99       866        75
IR     2025250    183200   23.1100  149.4700       5.8       105       866        77
IR     2025250    183200   23.0100  148.4100      12.2       134       936        70
IR     2025250    183200   23.0300  148.3500      11.3       130       934        79
IR     2025250    183200   23.0900  148.2100       9.8       118       933        84
IR     2025250    183200   23.0700  148.1100       9.4       113       913        68
IR     2025250    183200   23.0700  148.0900       9.5       112       909        65
IR     2025250    183200   22.9900  146.4700       9.4       139       832        75
IR     2025250    183200   23.0100  146.4500       9.8       138       832        78
IR     2025250    183200   23.0700  146.3000       9.3       126       858        78
IR     2025250    183200   23.0600  145.5900       8.9       101       945        91
IR     2025250    183200   22.9800  151.9300       4.2        84       907        71
IR     2025250    183200   23.0300  151.8700       4.5        88       883        68
IR     2025250    183200   23.0200  151.8100       4.7        89       870        75
IR     2025250    183200   22.9800  151.6500       5.1        87       873        73
IR     2025250    183200   23.0200  151.4100       5.1        94       974        97
IR     2025250    183200   22.9500  151.3000       5.9       114       955        80
IR     2025250    183200   22.9500  151.1900       4.9       113       929        76
IR     2025250    183200   23.0100  151.1200       4.7       105       929        73
IR     2025250    183200   23.0300  151.0600       4.2       100       926        78
IR     2025250    183200   22.9700  150.1200       6.0       106       946        78
IR     2025250    183200   22.9300  150.0300       7.6        73       923        79
IR     2025250    183200   22.9900  149.8900       7.5        85       929        92
IR     2025250    183200   22.9700  149.8700       7.8        88       926        93
IR     2025250    183200   22.9700  149.7200       7.8        88       909        96
IR     2025250    183200   22.9700  149.6400       7.0        87       883        92
IR     2025250    183200   22.9200  149.5300       5.6        87       868        90
IR     2025250    183200   22.9100  148.4800      12.4       136       918        73
IR     2025250    183200   22.9900  148.4100      12.1       133       936        72
IR     2025250    183200   22.9100  148.3600      11.3       129       942        82
IR     2025250    183200   22.9500  148.2600      10.3       120       936        82
IR     2025250    183200   22.9200  148.1400       9.7       115       904        60
IR     2025250    183200   22.9400  151.8000       4.6        86       874        84
IR     2025250    183200   22.9400  151.6500       5.1        90       883        74
IR     2025250    183200   22.8700  151.5200       5.5       104       949        81
IR     2025250    183200   22.8500  151.4700       5.7       109       951        74
IR     2025250    183200   22.9300  151.3600       5.9       104       964        81
IR     2025250    183200   22.9300  151.1900       4.8       113       926        73
IR     2025250    183200   22.8900  150.0000       8.0        78       926        83
IR     2025250    183200   22.8300  149.9100       8.7        98       910        94
IR     2025250    183200   22.8500  149.7900       8.3       101       891        90
IR     2025250    183200   22.8900  149.6900       7.4       101       879        91
IR     2025250    183200   22.9100  149.6700       7.0        97       881        95
IR     2025250    183200   22.8100  148.4900      11.5       133       935        77
IR     2025250    183200   22.8500  148.4200      12.5       133       953        72
IR     2025250    183200   22.8900  148.3800      11.7       130       945        79
IR     2025250    183200   22.8000  148.2100      11.4       123       897        62
IR     2025250    183200   22.7900  146.9600       5.6        99       842        60
IR     2025250    183200   22.7800  146.8800       6.6       104       820        75
IR     2025250    183200   22.8100  146.8400       7.0       113       850        83
IR     2025250    183200   22.7500  151.5800       6.3       118       911        73
IR     2025250    183200   22.7700  151.4600       6.7       117       936        62
IR     2025250    183200   22.7500  151.2700       5.6       110       946        75
IR     2025250    183200   22.8300  151.2400       5.2       113       933        88
IR     2025250    183200   22.7400  151.1500       4.6       112       912        75
IR     2025250    183200   22.7300  150.0300       8.1        99       958        83
IR     2025250    183200   22.8100  149.9100       8.8       100       907        96
IR     2025250    183200   22.7200  149.8200       7.8       105       881        89
IR     2025250    183200   22.8000  149.7500       7.8       104       870        89
IR     2025250    183200   22.7400  148.5300      10.3       126       961        86
IR     2025250    183200   22.7600  148.4500      12.0       130       961        79
IR     2025250    183200   22.7200  148.2800      11.0       118       885        72
IR     2025250    183200   22.7800  148.2000      11.7       124       881        65
IR     2025250    183200   22.7200  146.9200       6.3       109       800        68
IR     2025250    183200   22.7600  146.6600       9.8       133       786        60
IR     2025250    183200   22.7400  146.5500       9.8       130       730        73
IR     2025250    183200   22.6800  151.2800       5.8       108       951        89
IR     2025250    183200   22.6400  151.1500       5.1       114       916        76
IR     2025250    183200   22.6800  151.1400       4.8       114       913        82
IR     2025250    183200   22.6300  150.2600       6.4       106       982        67
IR     2025250    183200   22.6200  149.9500       7.6       104       930        92
IR     2025250    183200   22.6400  149.9300       7.4       101       913        94
IR     2025250    183200   22.6800  149.8300       7.2       103       881        83
IR     2025250    183200   22.7000  149.6700       6.1       108       854        86
IR     2025250    183200   22.6300  149.4400       4.9       106       900        73
IR     2025250    183200   22.6100  149.4200       4.9       106       932        73
IR     2025250    183200   22.6600  148.5600       8.9       115       971        83
IR     2025250    183200   22.6400  148.5400       8.9       115       973        74
IR     2025250    183200   22.6600  148.3400      10.3       109       903        76
IR     2025250    183200   22.6800  148.2400      10.5       115       829        88
IR     2025250    183200   22.5800  146.9700       6.5       127       751        66
IR     2025250    183200   22.6600  146.5700      10.9       125       681        73
IR     2025250    183200   22.5700  146.4200      12.1       113       743        78
IR     2025250    183200   22.5900  146.4000      11.8       113       740        85
IR     2025250    183200   22.6200  151.3000       5.8       110       959        88
IR     2025250    183200   22.6200  151.1500       5.3       115       916        83
IR     2025250    183200   22.5800  150.2600       6.3       106       980        72
IR     2025250    183200   22.5600  150.2300       6.4       107       981        68
IR     2025250    183200   22.6000  149.9100       7.0       102       904        91
IR     2025250    183200   22.5900  149.4300       5.0       105       901        76
IR     2025250    183200   22.5000  149.0300       7.3       112       957        88
IR     2025250    183200   22.5000  149.0100       7.4       113       959        88
IR     2025250    183200   22.5000  148.9100       8.6       120       936        68
IR     2025250    183200   22.5400  148.6100       6.7        87       968        74
IR     2025250    183200   22.5000  148.4400       9.2       113       949        73
IR     2025250    183200   22.4900  148.3400       8.6       104       894        77
IR     2025250    183200   22.5100  148.2600       8.6       101       890        93
IR     2025250    183200   22.4900  148.1600       8.1        99       884        96
IR     2025250    183200   22.4800  147.1000       5.7       139       773        61
IR     2025250    183200   22.4800  147.0200       6.4       136       686        61
IR     2025250    183200   22.5600  146.9800       6.4       130       744        66
IR     2025250    183200   22.4900  146.5300      11.7       118       694        79
IR     2025250    183200   22.5100  146.4900      12.1       117       732        77
IR     2025250    183200   22.4600  143.2000       8.4        72       945        64
IR     2025250    183200   22.4400  143.1000       7.9        88       958        75
IR     2025250    183200   22.4600  142.7800      12.3       124       963        80
IR     2025250    183200   22.4600  151.3800       4.5        94       944        66
IR     2025250    183200   22.4200  150.3000       5.6        79       971        88
IR     2025250    183200   22.4900  149.6300       5.9       103       866        85
IR     2025250    183200   22.4100  149.3900       6.5       103       984        76
IR     2025250    183200   22.4300  149.2700       6.5       104       961        85
IR     2025250    183200   22.4200  149.1900       6.4       103       952        97
IR     2025250    183200   22.4700  149.1500       6.8       105       964        97
IR     2025250    183200   22.4600  149.0500       7.3       113       957        84
IR     2025250    183200   22.4700  148.3400       8.4       105       892        79
IR     2025250    183200   22.3800  147.1300       6.3       131       743        68
IR     2025250    183200   22.4600  147.0400       6.2       138       686        60
IR     2025250    183200   22.4600  147.0200       6.4       136       685        60
IR     2025250    183200   22.3700  146.8300      10.6       122       683        67
IR     2025250    183200   22.3900  146.8100      10.4       122       683        70
IR     2025250    183200   22.4300  146.4500      12.4       113       780        77
IR     2025250    183200   22.4300  146.4300      12.1       110       790        75
IR     2025250    183200   22.3900  144.6500       9.5        92       933        68
IR     2025250    183200   22.3900  144.2100       9.7       109       920        60
IR     2025250    183200   22.3400  143.3700       6.7       121       916        78
IR     2025250    183200   22.4200  143.2400       6.9        82       925        64
IR     2025250    183200   22.4200  143.1600       7.2        81       928        67
IR     2025250    183200   22.3400  143.1100       5.7       114       909        61
IR     2025250    183200   22.3600  142.9300      10.8       124       932        77
IR     2025250    183200   22.3800  142.9200      12.3       125       944        83
IR     2025250    183200   22.4200  142.7400      12.0       126       962        74
IR     2025250    183200   22.4000  151.6000       5.0       104       963        62
IR     2025250    183200   22.3400  151.4500       4.0        88       914        71
IR     2025250    183200   22.3600  150.3500       5.4        92       972        77
IR     2025250    183200   22.4000  150.3200       5.5        80       969        87
IR     2025250    183200   22.3600  150.1500       5.8        70       957        92
IR     2025250    183200   22.3900  149.3300       6.5       100       975        73
IR     2025250    183200   22.3400  149.1600       6.4       102       935        96
IR     2025250    183200   22.3600  149.1400       6.5       105       939        96
IR     2025250    183200   22.3000  148.9900       7.4       115       888        66
IR     2025250    183200   22.3800  148.9200       8.4       119       890        61
IR     2025250    183200   22.3400  148.7100       6.6        94       874        67
IR     2025250    183200   22.3100  148.5000       7.9        74       893        77
IR     2025250    183200   22.3700  148.3900       8.3       102       900        87
IR     2025250    183200   22.3300  148.3200       8.0       101       892        98
IR     2025250    183200   22.3000  147.4100       7.2       116       935        90
IR     2025250    183200   22.2700  147.1600       7.5       128       694        79
IR     2025250    183200   22.3400  147.0900       7.7       133       685        65
IR     2025250    183200   22.2700  146.9200      10.0       123       689        81
IR     2025250    183200   22.2700  146.8200       9.7       117       690        82
IR     2025250    183200   22.2700  146.8000       9.5       116       691        80
IR     2025250    183200   22.2700  146.6600       9.2       111       696        85
IR     2025250    183200   22.2700  146.5500       9.6       117       737        88
IR     2025250    183200   22.2900  146.5000      10.0       119       785        78
IR     2025250    183200   22.3500  146.3800      10.9       111       848        62
IR     2025250    183200   22.3100  146.2800      10.1       103       905        64
IR     2025250    183200   22.3300  144.7100       9.1       100       934        92
IR     2025250    183200   22.2500  144.5600       6.1       107       919        88
IR     2025250    183200   22.2400  144.2800       8.4       116       917        78
IR     2025250    183200   22.3100  144.2700       8.6       115       918        78
IR     2025250    183200   22.2400  144.1600       8.5       127       916        85
IR     2025250    183200   22.2400  143.9800       9.1       131       917        86
IR     2025250    183200   22.2600  143.9100       9.9       126       919        87
IR     2025250    183200   22.2800  143.8700      10.3       124       920        88
IR     2025250    183200   22.2400  143.7300       8.3       138       915        65
IR     2025250    183200   22.2400  143.6300       7.5       145       914        69
IR     2025250    183200   22.2600  143.4900       8.2       141       915        72
IR     2025250    183200   22.3200  143.4500       7.2       129       915        78
IR     2025250    183200   22.2400  143.3100       6.2       150       909        81
IR     2025250    183200   22.2400  143.1900       5.0       151       901        64
IR     2025250    183200   22.3200  143.0900       6.1       123       906        64
IR     2025250    183200   22.2800  143.0500       6.6       132       908        60
IR     2025250    183200   22.2700  142.9100       8.7       130       913        66
IR     2025250    183200   22.2900  142.8700       9.7       127       917        75
IR     2025250    183200   22.3000  151.4600       4.0        90       920        80
IR     2025250    183200   22.2100  149.6400       6.1        87       916        97
IR     2025250    183200   22.2600  149.1700       6.8       107       911        76
IR     2025250    183200   22.2800  149.1500       6.7       106       916        80
IR     2025250    183200   22.2400  149.0100       7.7       116       881        66
IR     2025250    183200   22.2800  148.9500       7.6       113       880        68
IR     2025250    183200   22.2800  148.8500       7.4       107       874        68
IR     2025250    183200   22.1900  148.6600       6.3        87       874        94
IR     2025250    183200   22.2700  148.5600       7.1        70       875        64
IR     2025250    183200   22.2300  148.4600       7.7        69       886        90
IR     2025250    183200   22.2300  148.2900       7.8        81       912        97
IR     2025250    183200   22.2000  147.4600       8.6       119       919        88
IR     2025250    183200   22.2500  147.2000       7.7       128       737        90
IR     2025250    183200   22.1700  147.0300      10.4       128       702        68
IR     2025250    183200   22.1900  146.9100       9.6       119       743        91
IR     2025250    183200   22.1900  146.7700       7.9       108       752        94
IR     2025250    183200   22.2500  146.4300       9.8       115       866        71
IR     2025250    183200   22.1700  145.0800      11.3       102       940        81
IR     2025250    183200   22.1700  145.0400      11.6       102       936        82
IR     2025250    183200   22.1900  144.6800       4.8       119       919        69
IR     2025250    183200   22.1800  144.3800       9.1       121       915        80
IR     2025250    183200   22.1800  144.2800       8.1       125       914        66
IR     2025250    183200   22.1800  143.8600       7.4       137       914        68
IR     2025250    183200   22.1800  143.3600       7.0       163       898        77
IR     2025250    183200   22.2000  143.2400       6.2       164       895        74
IR     2025250    183200   22.2100  143.1300       5.9       151       898        69
IR     2025250    183200   22.2100  143.0700       6.7       146       901        63
IR     2025250    183200   22.1100  149.7900       7.0        88       885        92
IR     2025250    183200   22.1000  149.5200       6.5        89       991        91
IR     2025250    183200   22.1800  149.3900       6.7        94       994        77
IR     2025250    183200   22.1000  149.2200       9.4       119       887        64
IR     2025250    183200   22.1200  149.1600       8.9       116       885        65
IR     2025250    183200   22.1800  149.1000       8.6       119       888        67
IR     2025250    183200   22.1400  147.5500       9.2       121       929        88
IR     2025250    183200   22.0700  147.4900       9.7       127       899        88
IR     2025250    183200   22.0900  147.3500      10.7       129       855        85
IR     2025250    183200   22.1300  147.0500      10.6       128       722        73
IR     2025250    183200   22.1500  146.9500      10.0       122       794        85
IR     2025250    183200   22.0600  146.3400       9.4        97       931        60
IR     2025250    183200   22.0600  146.0800       9.6        86       928        77
IR     2025250    183200   22.1400  145.9200       9.8        95       941        92
IR     2025250    183200   22.1200  145.8800      10.2        91       940        87
IR     2025250    183200   22.0700  145.6900      10.9       107       942        80
IR     2025250    183200   22.1300  145.6400      12.1       103       941        78
IR     2025250    183200   22.0500  145.1300      10.3       112       928        89
IR     2025250    183200   22.0900  145.1100      10.4       109       933        88
IR     2025250    183200   22.0500  144.9300       9.2       112       921        82
IR     2025250    183200   22.0500  144.9100       9.1       113       921        78
IR     2025250    183200   22.1000  144.5400       7.0       142       907        61
IR     2025250    183200   22.1000  144.4400       9.2       136       911        66
IR     2025250    183200   22.0800  144.4100       9.7       134       910        74
IR     2025250    183200   22.0400  144.0300       6.8       148       904        76
IR     2025250    183200   22.0400  144.0100       6.8       149       906        79
IR     2025250    183200   22.0700  150.2400       4.5       109       972        64
IR     2025250    183200   22.0400  149.8700       7.1        94       883        76
IR     2025250    183200   22.0400  149.8300       7.0        96       885        79
IR     2025250    183200   21.9900  149.2500       9.5       122       894        76
IR     2025250    183200   22.0100  149.2300       9.4       123       891        72
IR     2025250    183200   22.0300  149.0700       9.2       114       888        82
IR     2025250    183200   22.0400  147.8500      10.2       121       950        86
IR     2025250    183200   22.0600  147.8300      10.4       122       951        84
IR     2025250    183200   22.0100  147.6600      10.0       123       933        87
IR     2025250    183200   21.9700  147.5400       9.9       129       881        89
IR     2025250    183200   22.0100  147.4400      11.4       133       867        86
IR     2025250    183200   22.0300  147.4200      11.5       132       870        86
IR     2025250    183200   22.0300  147.3200      11.9       130       799        81
IR     2025250    183200   21.9900  147.1400      10.2       126       837        76
IR     2025250    183200   22.0300  147.1200      10.0       126       787        74
IR     2025250    183200   22.0400  146.3600      10.2       100       932        64
IR     2025250    183200   21.9800  146.1900       9.2        96       928        63
IR     2025250    183200   22.0400  146.0900       9.7        90       926        69
IR     2025250    183200   21.9700  145.9700       9.9        95       926        72
IR     2025250    183200   21.9500  145.8500      10.1        94       936        63
IR     2025250    183200   21.9500  145.7100       8.9       110       940        80
IR     2025250    183200   21.9500  145.6300       9.2       117       944        82
IR     2025250    183200   21.9500  145.4500      11.3       108       932        85
IR     2025250    183200   21.9500  145.3700      11.9       108       925        90
IR     2025250    183200   21.9900  145.2700      11.2       110       926        90
IR     2025250    183200   22.0100  145.2300      10.6       115       924        87
IR     2025250    183200   21.9500  145.0800      11.0       124       908        85
IR     2025250    183200   21.9400  144.9600      10.0       128       801        93
IR     2025250    183200   21.9400  144.8800      10.0       130       806        93
IR     2025250    183200   21.9600  144.7700       8.0       126       860        84
IR     2025250    183200   22.0000  144.6900       5.8       132       888        81
IR     2025250    183200   21.9400  144.5700       8.6       128       885        90
IR     2025250    183200   21.9400  144.4500       9.6       133       903        81
IR     2025250    183200   21.9600  144.4300       9.7       133       909        83
IR     2025250    183200   22.0000  144.1100       6.4       146       887        68
IR     2025250    183200   21.9600  144.0300       6.3       155       881        73
IR     2025250    183200   21.9800  143.9300       5.6       160       902        64
IR     2025250    183200   21.9300  143.6100       7.2       162       907        84
IR     2025250    183200   21.9300  143.3900       9.8       139       909        74
IR     2025250    183200   21.9300  143.2900       8.9       141       916        64
IR     2025250    183200   21.9700  143.2300       8.2       155       908        65
IR     2025250    183200   21.9100  150.1800       9.5       117       968        82
IR     2025250    183200   21.9100  150.1200       9.1       119       968        83
IR     2025250    183200   21.8900  149.3000       9.1       125       905        77
IR     2025250    183200   21.9700  149.2700       9.4       123       896        74
IR     2025250    183200   21.8900  149.1300       8.1       102       896        89
IR     2025250    183200   21.9500  149.0600       8.7       109       893        90
IR     2025250    183200   21.8900  147.8600       8.0       112       950        86
IR     2025250    183200   21.9500  147.5600       9.6       128       882        89
IR     2025250    183200   21.9500  147.4800      10.9       133       845        88
IR     2025250    183200   21.9100  147.3100      12.0       128       802        81
IR     2025250    183200   21.9500  147.2700      12.6       130       799        82
IR     2025250    183200   21.9500  147.1700      11.2       126       829        85
IR     2025250    183200   21.8800  146.3600      13.4       126       980        71
IR     2025250    183200   21.8500  146.2400       7.8       119       915        69
IR     2025250    183200   21.8500  146.1600       8.2       117       913        78
IR     2025250    183200   21.8900  145.9800       9.1        98       921        63
IR     2025250    183200   21.9300  145.6800       9.3       118       940        82
IR     2025250    183200   21.9100  145.6000      10.5       123       934        76
IR     2025250    183200   21.9300  145.4600      11.6       110       931        86
IR     2025250    183200   21.9300  145.3800      12.2       107       925        90
IR     2025250    183200   21.8400  145.2400      11.7       114       911        91
IR     2025250    183200   21.9000  145.1400      10.8       121       906        84
IR     2025250    183200   21.9300  145.1000      11.0       123       906        85
IR     2025250    183200   21.8800  144.9600      10.3       131       770        88
IR     2025250    183200   21.9000  144.9200      10.6       131       787        93
IR     2025250    183200   21.8600  144.8200      11.4       119       603        75
IR     2025250    183200   21.9200  144.7000       8.3       130       868        91
IR     2025250    183200   21.8800  144.6000       8.5       124       872        94
IR     2025250    183200   21.8600  144.4400       8.3       153       557        64
IR     2025250    183200   21.8600  144.4200       8.0       156       556        64
IR     2025250    183200   21.9200  144.0900       5.2       161       589        63
IR     2025250    183200   21.8300  143.9600       5.8       144       592        89
IR     2025250    183200   21.8300  143.7000       4.1       130       917        70
IR     2025250    183200   21.8300  143.5400       8.4       121       937        78
IR     2025250    183200   21.9100  143.4900       8.9       143       912        84
IR     2025250    183200   21.9100  143.4300       9.4       137       914        82
IR     2025250    183200   21.9100  143.3100       9.5       134       922        66
IR     2025250    183200   21.8000  150.1100       7.9       102       944        93
IR     2025250    183200   21.8200  150.0900       7.8       103       938        95
IR     2025250    183200   21.8000  149.8800       7.1        86       920        96
IR     2025250    183200   21.8700  149.3200       9.3       127       913        77
IR     2025250    183200   21.8100  149.1500       7.5        99       901        94
IR     2025250    183200   21.8500  149.1100       7.6        98       898        97
IR     2025250    183200   21.7900  147.8700       7.2       107       937        87
IR     2025250    183200   21.7700  147.7200       8.6       129       862        79
IR     2025250    183200   21.8100  147.5200       9.9       126       800        77
IR     2025250    183200   21.8300  147.3400      10.0       121       820        86
IR     2025250    183200   21.7800  147.1600       9.1       115       857        98
IR     2025250    183200   21.7600  146.9600       9.3       119       937        82
IR     2025250    183200   21.7700  145.5700      13.5       121       922        79
IR     2025250    183200   21.7400  145.3900      13.3       115       763        95
IR     2025250    183200   21.7800  145.3100      12.8       114       749        94
IR     2025250    183200   21.8000  145.2800      12.6       112       838        95
IR     2025250    183200   21.8200  145.1800      11.1       120       757        93
IR     2025250    183200   21.8000  145.0600      10.4       120       592        76
IR     2025250    183200   21.8200  144.8800      12.2       117       595        65
IR     2025250    183200   21.8200  144.7200       9.9       122       594        87
IR     2025250    183200   21.7600  144.5900       7.7       120       853        91
IR     2025250    183200   21.7800  144.5000       7.5       140       561        84
IR     2025250    183200   21.7800  144.4800       7.4       144       559        80
IR     2025250    183200   21.8200  144.3800       7.3       158       553        78
IR     2025250    183200   21.8100  144.2000       5.0       163       565        85
IR     2025250    183200   21.7900  144.1600       4.7       158       566        87
IR     2025250    183200   21.8100  144.0000       5.4       151       585        85
IR     2025250    183200   21.7600  149.8800       6.9        88       919        97
IR     2025250    183200   21.6900  149.4200      10.0       125       934        71
IR     2025250    183200   21.6900  149.3200       9.1       121       925        77
IR     2025250    183200   21.6900  149.2200       7.9       109       919        75
IR     2025250    183200   21.7500  149.1400       7.5        92       905        95
IR     2025250    183200   21.7300  147.8800       7.3       109       930        74
IR     2025250    183200   21.6700  147.6100       9.3       133       752        77
IR     2025250    183200   21.7300  147.5800       9.2       128       768        80
IR     2025250    183200   21.6600  147.4500       9.2       112       787        95
IR     2025250    183200   21.7400  147.2200       8.7       114       845        97
IR     2025250    183200   21.7200  147.0900       8.5       116       894        89
IR     2025250    183200   21.6600  147.0500       8.3       114       933        86
IR     2025250    183200   21.7000  146.7100       7.1       103       899        91
IR     2025250    183200   21.7200  146.6900       7.3        96       961        87
IR     2025250    183200   21.6900  146.5100      14.1       131       984        77
IR     2025250    183200   21.6400  145.5000      13.8       121       713        87
IR     2025250    183200   21.6600  145.4500      13.2       119       667        84
IR     2025250    183200   21.7200  145.3300      12.4       117       649        85
IR     2025250    183200   21.7000  145.0100      10.9       112       581        67
IR     2025250    183200   21.7200  144.9900      11.8       113       584        70
IR     2025250    183200   21.6400  144.8200      11.8       111       588        91
IR     2025250    183200   21.6400  144.7100      10.3       118       589        93
IR     2025250    183200   21.6400  144.6900      10.1       117       588        94
IR     2025250    183200   21.6300  144.5100       7.7       126       575        86
IR     2025250    183200   21.6300  144.4300       7.6       131       565        86
IR     2025250    183200   21.6500  144.3300       7.3       149       553        88
IR     2025250    183200   21.6700  144.2300       7.3       127       776        73
IR     2025250    183200   21.6700  144.1100       6.4       107       812        69
IR     2025250    183200   21.6700  144.0900       5.7       143       572        72
IR     2025250    183200   21.7100  143.9900       5.5       150       578        74
IR     2025250    183200   21.6500  151.8200       4.2       103       936        70
IR     2025250    183200   21.6500  147.8300       8.2       130       889        66
IR     2025250    183200   21.6100  147.7100       9.5       139       820        76
IR     2025250    183200   21.5700  147.6800      10.2       139       751        75
IR     2025250    183200   21.6200  147.1300       8.2       111       915        87
IR     2025250    183200   21.6200  147.0000       8.1       108       940        88
IR     2025250    183200   21.6000  146.8400       7.0       101       918        76
IR     2025250    183200   21.5500  146.6400       7.5       116       934        76
IR     2025250    183200   21.6000  145.5600      13.4       121       706        88
IR     2025250    183200   21.6200  145.5200      13.7       122       688        86
IR     2025250    183200   21.5400  144.8600      10.4       108       592        93
IR     2025250    183200   21.5800  144.7800      14.1       112       774        84
IR     2025250    183200   21.6200  144.7200      13.0       116       803        94
IR     2025250    183200   21.6100  144.6000       9.6       115       584        91
IR     2025250    183200   21.5300  144.5000       8.1       107       585        65
IR     2025250    183200   21.5500  144.4400       7.6       112       583        81
IR     2025250    183200   21.5300  144.2600       7.2       120       768        64
IR     2025250    183200   21.5500  144.2400       7.2       117       768        60
IR     2025250    183200   21.5900  144.0900       6.6        98       773        61
IR     2025250    183200   21.5300  143.9600       6.6       108       849        80
IR     2025250    183200   21.6100  143.8900       7.4       109       908        64
IR     2025250    183200   21.5700  149.7100       7.1        88       963        87
IR     2025250    183200   21.5700  149.6700       7.3        94       974        79
IR     2025250    183200   21.4900  149.5000       9.5       105       934        87
IR     2025250    183200   21.5500  149.4100       9.1       108       933        86
IR     2025250    183200   21.4900  149.3600       9.1        96       923        91
IR     2025250    183200   21.5500  147.9500       7.5       121       929        84
IR     2025250    183200   21.5300  147.6600      10.7       137       733        71
IR     2025250    183200   21.5400  147.5400      10.8       128       751        81
IR     2025250    183200   21.5200  147.3200       9.3       119       893        89
IR     2025250    183200   21.4600  147.0100       7.7       109       968        67
IR     2025250    183200   21.5400  146.8800       7.8        99       926        69
IR     2025250    183200   21.5300  146.6800       7.3       104       920        63
IR     2025250    183200   21.5300  146.6600       7.2       109       920        66
IR     2025250    183200   21.4400  145.5900      10.6       124       589        72
IR     2025250    183200   21.5200  145.5600      11.9       122       589        68
IR     2025250    183200   21.4500  144.8900       8.0       111       589        86
IR     2025250    183200   21.5200  144.8400      11.2       106       595        91
IR     2025250    183200   21.5100  144.7000      12.9       111       779        84
IR     2025250    183200   21.5100  144.6800      12.9       110       779        82
IR     2025250    183200   21.5100  144.5400      10.4       111       766        60
IR     2025250    183200   21.5100  144.4000       7.4       122       763        60
IR     2025250    183200   21.4700  144.3200       7.3       132       764        77
IR     2025250    183200   21.5100  144.2600       7.2       123       768        66
IR     2025250    183200   21.4300  144.1800       5.7       116       766        67
IR     2025250    183200   21.4500  144.0000       6.1       109       828        74
IR     2025250    183200   21.4500  149.7000       7.8        99       970        77
IR     2025250    183200   21.4700  149.6800       7.7        99       967        82
IR     2025250    183200   21.4100  149.5300       8.8        98       943        89
IR     2025250    183200   21.4700  149.4000       9.3        97       921        92
IR     2025250    183200   21.4700  149.3800       9.3        95       922        92
IR     2025250    183200   21.4500  147.9400       7.4       131       895        78
IR     2025250    183200   21.4000  147.8100       8.8       140       783        83
IR     2025250    183200   21.4300  147.7900       9.5       142       777        79
IR     2025250    183200   21.3600  147.6900       8.4       128       711        90
IR     2025250    183200   21.4400  147.5100       9.9       124       763        85
IR     2025250    183200   21.3600  147.4500       9.4       122       796        89
IR     2025250    183200   21.3600  147.3700       9.6       123       829        89
IR     2025250    183200   21.3900  146.9300       8.6       105       943        68
IR     2025250    183200   21.4100  146.9100       8.6       102       935        60
IR     2025250    183200   21.4100  146.7300       7.9       110       915        62
IR     2025250    183200   21.4300  146.7100       7.8       109       915        60
IR     2025250    183200   21.3400  145.7400      11.4       116       870        81
IR     2025250    183200   21.4200  145.6300      11.2       125       663        90
IR     2025250    183200   21.4200  145.6100      11.0       127       635        82
IR     2025250    183200   21.3800  145.5100      11.1       126       573        68
IR     2025250    183200   21.4100  144.8700       8.8       111       590        85
IR     2025250    183200   21.3900  144.7300      12.8       114       737        79
IR     2025250    183200   21.4100  144.6700      13.8       113       757        74
IR     2025250    183200   21.4100  144.6100      14.5       110       757        76
IR     2025250    183200   21.4100  144.4300       9.7       119       576        77
IR     2025250    183200   21.3300  144.2300       6.3       153       540        61
IR     2025250    183200   21.3300  144.1700       7.7       139       548        67
IR     2025250    183200   21.3700  143.9300       7.1       124       864        74
IR     2025250    183200   21.3200  151.9000       4.3        66       947        90
IR     2025250    183200   21.3100  149.5400       8.2        91       942        91
IR     2025250    183200   21.3500  149.4500       8.9        91       925        93
IR     2025250    183200   21.3000  149.3400       9.6        81       916        93
IR     2025250    183200   21.3300  148.1100       6.8        97       906        71
IR     2025250    183200   21.3100  148.0900       6.2        98       902        74
IR     2025250    183200   21.2800  147.9000       5.9       124       848        84
IR     2025250    183200   21.3400  147.8500       6.8       130       764        91
IR     2025250    183200   21.2800  147.7000       6.7       117       725        94
IR     2025250    183200   21.2600  147.6000       6.5       109       755        92
IR     2025250    183200   21.2600  147.5600       7.0       114       758        97
IR     2025250    183200   21.3400  147.4800       8.8       122       769        88
IR     2025250    183200   21.3400  147.3600       9.6       123       798        91
IR     2025250    183200   21.3000  147.2000       8.7       122       868        91
IR     2025250    183200   21.2600  147.1800       8.6       120       851        93
IR     2025250    183200   21.2500  146.9900       8.9       122       939        70
IR     2025250    183200   21.3100  146.5400       9.3       118       929        65
IR     2025250    183200   21.3300  146.5200       9.1       117       935        70
IR     2025250    183200   21.3100  146.2800       7.7       110       874        61
IR     2025250    183200   21.2800  146.1400       9.3       118       877        60
IR     2025250    183200   21.3200  145.8800      12.6       114       895        77
IR     2025250    183200   21.3200  145.7600      11.6       113       876        83
IR     2025250    183200   21.2400  145.6300      11.1       120       703        97
IR     2025250    183200   21.2600  145.6200      11.3       120       655        90
IR     2025250    183200   21.3000  145.4400      11.5       120       568        69
IR     2025250    183200   21.2500  144.1700       7.5       143       521        63
IR     2025250    183200   21.3000  151.9400       4.1        64       947        70
IR     2025250    183200   21.2800  151.8100       4.9        65       963        82
IR     2025250    183200   21.3000  151.5900       4.0        77       966        85
IR     2025250    183200   21.2100  151.2500       4.1        83       966        66
IR     2025250    183200   21.2400  149.3700       8.8        76       926        95
IR     2025250    183200   21.1800  147.9900       5.0       118       884        85
IR     2025250    183200   21.1600  147.8700       5.0       123       826        67
IR     2025250    183200   21.1800  147.8300       5.2       122       788        77
IR     2025250    183200   21.2000  147.6700       5.7       107       758        91
IR     2025250    183200   21.1800  147.6300       5.8       108       769        81
IR     2025250    183200   21.1800  147.4900       8.6       128       741        88
IR     2025250    183200   21.1800  147.4500       9.3       131       727        86
IR     2025250    183200   21.1600  147.2700       9.3       126       728        89
IR     2025250    183200   21.2300  147.1700       8.6       120       843        91
IR     2025250    183200   21.1700  147.1300       8.2       116       877        81
IR     2025250    183200   21.1900  147.0300       8.8       119       913        71
IR     2025250    183200   21.2200  145.9900      12.0       103       907        60
IR     2025250    183200   21.1800  145.8500      10.4        93       908        85
IR     2025250    183200   21.1800  145.5300      12.8       115       693        87
IR     2025250    183200   21.2000  145.4300      12.7       112       579        75
IR     2025250    183200   21.2000  145.4100      11.6       112       577        76
IR     2025250    183200   21.1300  144.8300       8.4       129       556        80
IR     2025250    183200   21.1300  144.8100       8.5       129       554        82
IR     2025250    183200   21.1300  144.6500      10.2       137       531        89
IR     2025250    183200   21.1500  144.5400      10.4       147       523        86
IR     2025250    183200   21.1300  144.4900      10.0       159       520        79
IR     2025250    183200   21.1500  144.4200       9.5       169       513        80
IR     2025250    183200   21.2100  144.3000       8.1       170       514        83
IR     2025250    183200   21.1800  144.1400       8.4       132       507        80
IR     2025250    183200   21.1400  151.8800       5.2        66       957        96
IR     2025250    183200   21.1900  151.5500       4.6        73       968        73
IR     2025250    183200   21.1100  151.3600       4.7        76       963        95
IR     2025250    183200   21.1100  151.3400       4.5        77       960        95
IR     2025250    183200   21.1100  151.1300       4.2        93       942        92
IR     2025250    183200   21.1200  147.9900       4.8       115       889        84
IR     2025250    183200   21.1200  147.6900       5.4       109       805        78
IR     2025250    183200   21.1000  147.6600       5.4       110       806        80
IR     2025250    183200   21.0600  147.5200       9.3       131       725        78
IR     2025250    183200   21.1400  147.4700       9.7       131       726        85
IR     2025250    183200   21.0700  147.2800      10.3       130       740        86
IR     2025250    183200   21.0700  147.2600      10.0       128       758        86
IR     2025250    183200   21.1300  147.1300       8.5       118       891        73
IR     2025250    183200   21.1300  147.0100       9.8       122       909        80
IR     2025250    183200   21.0400  145.9800      11.8        86       917        92
IR     2025250    183200   21.0600  145.9600      11.3        88       916        91
IR     2025250    183200   21.0400  145.7800       9.1        90       913        92
IR     2025250    183200   21.1200  145.6900       9.7       120       892        77
IR     2025250    183200   21.1000  145.5900      12.3       116       816        97
IR     2025250    183200   21.1000  145.5300      13.4       114       802        94
IR     2025250    183200   21.0300  145.4400      14.6       116       799        78
IR     2025250    183200   21.0500  144.7500       8.7       144       535        76
IR     2025250    183200   21.0500  144.6900       9.1       143       529        78
IR     2025250    183200   21.0900  144.5700       9.1       152       523        71
IR     2025250    183200   21.0900  144.4900       9.6       162       519        77
IR     2025250    183200   21.0700  144.3900       9.3       172       512        81
IR     2025250    183200   21.0200  144.2500       8.5       148       514        88
IR     2025250    183200   21.0400  144.2100       7.9       144       513        85
IR     2025250    183200   21.0900  151.3800       5.2        73       969        97
IR     2025250    183200   21.0300  151.2500       4.8        79       953        96
IR     2025250    183200   21.0400  151.0200       4.3        98       940        85
IR     2025250    183200   21.0000  147.9200       5.6       128       865        60
IR     2025250    183200   21.0200  147.7800       4.7       118       842        68
IR     2025250    183200   20.9500  147.3300      13.6       143       830        77
IR     2025250    183200   20.9900  147.2900      11.9       140       838        70
IR     2025250    183200   21.0300  147.2000       9.8       123       868        66
IR     2025250    183200   20.9500  146.9500      10.8       118       886        81
IR     2025250    183200   21.0000  146.2800      10.3       104       890        91
IR     2025250    183200   20.9400  146.0300      13.8        93       919        69
IR     2025250    183200   20.9400  145.8900      12.1       100       917        82
IR     2025250    183200   20.9400  145.8500      12.1       100       914        89
IR     2025250    183200   20.9600  145.6000      13.2       122       799        87
IR     2025250    183200   21.0100  145.4200      14.4       119       798        73
IR     2025250    183200   20.9900  144.7400       8.8       142       529        72
IR     2025250    183200   21.0100  144.6300       9.2       149       520        72
IR     2025250    183200   20.9900  144.4700       9.1       157       507        85
IR     2025250    183200   21.0100  144.4500       8.9       162       511        86
IR     2025250    183200   21.0000  144.3100       8.6       155       509        87
IR     2025250    183200   20.9200  144.0100       8.8       126       560        95
IR     2025250    183200   20.9200  143.9100       9.9       129       542        97
IR     2025250    183200   20.9600  143.8300      11.6       126       551        95
IR     2025250    183200   20.9900  151.7600       5.3        63       959        85
IR     2025250    183200   20.9100  151.3400       6.8        61       952        96
IR     2025250    183200   20.9900  151.2800       5.2        71       952        99
IR     2025250    183200   20.9600  150.8300       5.1       102       941        61
IR     2025250    183200   20.9400  147.9500       6.7       128       886        61
IR     2025250    183200   20.8600  147.7600       6.4       129       842        89
IR     2025250    183200   20.9000  147.5700      10.3       138       707        72
IR     2025250    183200   20.9300  147.3500      14.3       144       790        80
IR     2025250    183200   20.8700  147.2000      12.8       136       906        69
IR     2025250    183200   20.9300  147.1700      11.2       128       884        67
IR     2025250    183200   20.9100  147.0700      10.8       126       866        89
IR     2025250    183200   20.8700  146.8800      10.6       114       844        87
IR     2025250    183200   20.8900  146.8700      10.3       112       858        83
IR     2025250    183200   20.8500  146.7400      10.9       115       879        79
IR     2025250    183200   20.8600  146.4600      12.1       129       881        84
IR     2025250    183200   20.8400  146.3000      12.4       113       892        69
IR     2025250    183200   20.8600  146.2300      12.5       102       911        71
IR     2025250    183200   20.8400  146.1000      14.2       103       917        71
IR     2025250    183200   20.8400  146.0800      14.2       103       917        74
IR     2025250    183200   20.8800  145.9700      13.3       105       911        72
IR     2025250    183200   20.8800  145.8700      13.5       115       821        95
IR     2025250    183200   20.8700  145.5900      14.1       123       793        90
IR     2025250    183200   20.9100  144.9800      11.5       136       576        82
IR     2025250    183200   20.8900  144.9600      11.6       138       565        78
IR     2025250    183200   20.9100  144.8600      10.7       139       544        77
IR     2025250    183200   20.8200  144.3800      10.0       130       498        96
IR     2025250    183200   20.9000  143.9300       9.5       129       540        96
IR     2025250    183200   20.8600  143.8300      13.1       130       405        87
IR     2025250    183200   20.8300  151.5300       5.6        55       979        90
IR     2025250    183200   20.7700  147.4200      15.1       143       780        84
IR     2025250    183200   20.7500  147.3100      14.3       143       862        83
IR     2025250    183200   20.8300  147.2200      13.3       139       906        74
IR     2025250    183200   20.7900  147.0400      10.6       124       846        89
IR     2025250    183200   20.7900  146.9800      10.9       122       831        89
IR     2025250    183200   20.7500  146.9100      11.2       119       758        92
IR     2025250    183200   20.8300  146.8200      11.3       113       838        93
IR     2025250    183200   20.7800  146.7000      11.8       113       881        74
IR     2025250    183200   20.7600  146.3600      13.2       122       905        84
IR     2025250    183200   20.7400  146.3000      13.6       115       906        85
IR     2025250    183200   20.7800  146.1800      14.1       104       891        78
IR     2025250    183200   20.8000  146.1400      14.6       105       886        72
IR     2025250    183200   20.7600  146.0000      13.9       116       800        94
IR     2025250    183200   20.8000  145.9400      14.2       121       808        93
IR     2025250    183200   20.7900  144.7700       9.3       144       484        84
IR     2025250    183200   20.7800  144.4900      11.0       124       340        87
IR     2025250    183200   20.7200  144.0800      10.6       124       365        92
IR     2025250    183200   20.8000  143.7300      10.8       137       416        78
IR     2025250    183200   20.7400  151.3000       7.0        56       942        90
IR     2025250    183200   20.6600  147.8500       6.2       132       859        67
IR     2025250    183200   20.7200  147.7700       6.2       126       796        67
IR     2025250    183200   20.6500  147.5300      13.5       126       714        87
IR     2025250    183200   20.6700  147.3900      13.9       130       786        81
IR     2025250    183200   20.6500  147.3100      12.0       126       826        78
IR     2025250    183200   20.6500  147.2100      10.3       117       849        81
IR     2025250    183200   20.7300  147.1100      11.2       125       847        86
IR     2025250    183200   20.7300  146.9900      10.9       119       815        89
IR     2025250    183200   20.6600  146.7300      12.3       119       856        71
IR     2025250    183200   20.6600  146.3900      12.2       123       921        84
IR     2025250    183200   20.7200  146.3100      13.3       118       908        85
IR     2025250    183200   20.7000  146.1900      13.5       107       864        94
IR     2025250    183200   20.7200  146.1600      13.9       106       837        97
IR     2025250    183200   20.7200  146.0400      13.9       112       797        91
IR     2025250    183200   20.6300  145.5500       9.5       146       359        82
IR     2025250    183200   20.6700  145.4400      10.3       150       372        80
IR     2025250    183200   20.6500  145.3200      11.1       146       356        61
IR     2025250    183200   20.6700  145.3000      11.3       143       372        62
IR     2025250    183200   20.7100  145.2000      11.5       138       474        71
IR     2025250    183200   20.6500  145.0600      10.0       141       488        80
IR     2025250    183200   20.7100  144.9200       9.6       146       499        77
IR     2025250    183200   20.6300  144.8400      10.7       141       313        87
IR     2025250    183200   20.7100  144.7500       8.5       148       320        91
IR     2025250    183200   20.6200  144.6400       9.3       132       323        97
IR     2025250    183200   20.6200  144.5200       9.1       123       336        95
IR     2025250    183200   20.7000  144.4300      10.7       125       336        98
IR     2025250    183200   20.6200  144.3300       8.8       131       331        97
IR     2025250    183200   20.6200  144.3100       9.0       131       330        97
IR     2025250    183200   20.6600  143.8400      10.1       135       315        88
IR     2025250    183200   20.6100  143.1300       8.3       144       558        91
IR     2025250    183200   20.6100  143.1100       8.0       144       559        91
IR     2025250    183200   20.6400  147.9700       7.6       130       881        75
IR     2025250    183200   20.5600  147.8200       6.7       133       825        69
IR     2025250    183200   20.6000  147.8000       6.2       128       811        69
IR     2025250    183200   20.6300  147.5200      13.0       123       714        88
IR     2025250    183200   20.6100  147.4200      12.6       124       739        86
IR     2025250    183200   20.6300  147.2800      10.7       122       827        74
IR     2025250    183200   20.5900  147.1600       9.7       103       842        94
IR     2025250    183200   20.5900  147.1200       9.4       101       839        95
IR     2025250    183200   20.6300  147.0000       9.9       109       815        77
IR     2025250    183200   20.5900  146.9000      10.7       109       765        77
IR     2025250    183200   20.5400  146.7400      11.1       108       817        94
IR     2025250    183200   20.5400  146.7000      10.7       107       893        90
IR     2025250    183200   20.5800  146.4400      11.3       116       923        70
IR     2025250    183200   20.5400  146.3000      11.1       118       905        64
IR     2025250    183200   20.6200  146.1700      12.2       117       827        74
IR     2025250    183200   20.5600  146.0800      12.6       118       807        83
IR     2025250    183200   20.5600  146.0400      12.9       120       802        86
IR     2025250    183200   20.5700  145.6500       9.1       143       358        87
IR     2025250    183200   20.6100  145.5700       9.3       147       351        81
IR     2025250    183200   20.6100  145.3900      10.2       157       346        67
IR     2025250    183200   20.6100  145.3300      10.3       153       336        61
IR     2025250    183200   20.6100  145.2700      10.3       149       326        61
IR     2025250    183200   20.6100  145.0000      11.0       138       470        93
IR     2025250    183200   20.5200  144.8100      12.8       130       314        83
IR     2025250    183200   20.5200  144.7900      12.4       130       313        83
IR     2025250    183200   20.5200  144.6600      10.2       128       318        93
IR     2025250    183200   20.5200  144.6000       9.2       130       326        97
IR     2025250    183200   20.5600  144.5000       8.8       126       335        92
IR     2025250    183200   20.6000  144.3300       8.6       131       330        95
IR     2025250    183200   20.6000  144.2700       9.5       133       325        94
IR     2025250    183200   20.5400  143.9500      11.2       134       306        83
IR     2025250    183200   20.5200  143.9300      11.0       137       305        75
IR     2025250    183200   20.5800  143.8300      10.3       136       307        73
IR     2025250    183200   20.6000  143.6600       6.9       150       313        76
IR     2025250    183200   20.5300  143.4000       7.5       169       338        90
IR     2025250    183200   20.5100  143.3600       7.9       164       336        89
IR     2025250    183200   20.5700  143.1800       8.6       154       545        82
IR     2025250    183200   20.5700  143.1600       8.3       155       545        84
IR     2025250    183200   20.5200  147.9800       8.3       132       873        85
IR     2025250    183200   20.4500  147.8100       8.7       128       717        77
IR     2025250    183200   20.5300  147.7800       6.9       126       712        76
IR     2025250    183200   20.5300  147.2400       8.9       101       792        77
IR     2025250    183200   20.5100  147.2100       9.0        96       798        76
IR     2025250    183200   20.5200  146.3200      11.1       120       908        65
IR     2025250    183200   20.4900  145.6600       9.0       155       327        79
IR     2025250    183200   20.5100  145.6400       9.0       156       326        79
IR     2025250    183200   20.5100  145.5500       8.9       168       317        72
IR     2025250    183200   20.4700  145.3600       8.0       165       308        84
IR     2025250    183200   20.4900  145.3300       8.4       162       309        81
IR     2025250    183200   20.5100  145.2300       8.7       153       313        83
IR     2025250    183200   20.4500  145.0700      10.9       130       328        77
IR     2025250    183200   20.4700  145.0100      12.8       130       334        83
IR     2025250    183200   20.4200  144.8700      14.7       122       333        85
IR     2025250    183200   20.4400  144.7900      14.2       123       319        84
IR     2025250    183200   20.4200  144.7500      14.0       119       320        84
IR     2025250    183200   20.4400  144.6500      11.7       123       315        84
IR     2025250    183200   20.4400  144.5100      10.6       125       318        90
IR     2025250    183200   20.4200  144.4300      11.8       117       319        82
IR     2025250    183200   20.4800  144.2800       8.5       134       321        93
IR     2025250    183200   20.4600  144.2600       9.2       132       321        94
IR     2025250    183200   20.5000  144.0800       9.0       138       312        93
IR     2025250    183200   20.5000  144.0000       9.7       134       308        91
IR     2025250    183200   20.5000  143.8900      10.4       139       304        69
IR     2025250    183200   20.4800  143.8700      10.1       141       303        71
IR     2025250    183200   20.4200  143.7600      10.4       140       301        82
IR     2025250    183200   20.5000  143.5900       6.2       148       308        74
IR     2025250    183200   20.4900  143.5500       6.1       156       308        76
IR     2025250    183200   20.4700  143.4700       6.4       162       311        80
IR     2025250    183200   20.4700  143.2000       7.5       167       350        86
IR     2025250    183200   20.4200  148.0500      10.3       125       906        83
IR     2025250    183200   20.4400  148.0100       9.7       126       887        85
IR     2025250    183200   20.3800  147.8600      11.0       132       787        81
IR     2025250    183200   20.4300  147.8100       9.0       127       714        79
IR     2025250    183200   20.3900  145.5600       7.7       158       283        89
IR     2025250    183200   20.3700  145.4600       6.9       146       268        78
IR     2025250    183200   20.3700  145.4000       7.5       139       284        75
IR     2025250    183200   20.4100  145.3000       7.9       143       290        77
IR     2025250    183200   20.3300  145.2000      11.2       123       304        68
IR     2025250    183200   20.3500  145.1200      11.3       124       314        72
IR     2025250    183200   20.3300  144.9600      13.8       117       330        79
IR     2025250    183200   20.3600  144.8800      14.9       117       337        81
IR     2025250    183200   20.4000  144.7900      14.8       118       327        83
IR     2025250    183200   20.3800  144.7300      14.8       114       319        79
IR     2025250    183200   20.3600  144.5500      14.0       112       304        76
IR     2025250    183200   20.3200  144.4500      16.1       114       299        72
IR     2025250    183200   20.3200  144.4100      15.6       115       301        75
IR     2025250    183200   20.3200  144.1500       8.1       139       302        95
IR     2025250    183200   20.3200  144.0500       6.7       154       295        90
IR     2025250    183200   20.3600  143.9600       6.5       154       300        89
IR     2025250    183200   20.3800  143.8200       8.8       147       300        82
IR     2025250    183200   20.4000  143.7600      10.0       141       300        85
IR     2025250    183200   20.3300  143.6000       6.8       143       291        97
IR     2025250    183200   20.3900  143.5500       7.3       140       298        91
IR     2025250    183200   20.3900  143.3900       7.1       150       302        86
IR     2025250    183200   20.3400  150.0700       5.1        70       939        66
IR     2025250    183200   20.2800  148.0900       9.5       117       921        86
IR     2025250    183200   20.2800  147.9500      10.2       128       858        74
IR     2025250    183200   20.3400  147.8800      11.3       132       753        81
IR     2025250    183200   20.3000  146.3200      13.5       130       903        76
IR     2025250    183200   20.3200  146.3100      13.5       131       903        79
IR     2025250    183200   20.3000  146.1800      13.4       136       870        77
IR     2025250    183200   20.2300  145.5900      10.4       114       286        66
IR     2025250    183200   20.2500  145.4500      11.4       101       279        74
IR     2025250    183200   20.2500  145.4300      12.0       101       282        71
IR     2025250    183200   20.2700  145.2700      12.9       113       294        73
IR     2025250    183200   20.2900  145.2300      12.3       116       300        68
IR     2025250    183200   20.2300  145.0900      14.5       111       308        78
IR     2025250    183200   20.2500  145.0300      14.2       109       312        73
IR     2025250    183200   20.3000  144.8600      16.6       105       335        77
IR     2025250    183200   20.2200  144.7600      17.4       107       296        77
IR     2025250    183200   20.2200  144.6800      16.8       112       288        76
IR     2025250    183200   20.2200  144.5600      17.0       115       258        80
IR     2025250    183200   20.2200  144.4800      17.0       118       247        82
IR     2025250    183200   20.2400  144.3800      16.9       115       246        81
IR     2025250    183200   20.2400  143.9100       7.1       164       273        88
IR     2025250    183200   20.2400  143.8900       7.2       165       278        85
IR     2025250    183200   20.2200  143.7900       7.8       158       274        74
IR     2025250    183200   20.2100  143.6600       6.7       169       272        80
IR     2025250    183200   20.2100  143.5800       6.0       166       272        87
IR     2025250    183200   20.2100  143.4600       5.1       164       275        83
IR     2025250    183200   20.2900  143.3500       6.8       150       280        95
IR     2025250    183200   20.2500  143.2800       6.3       155       275        83
IR     2025250    183200   20.2200  147.9500       8.8       123       842        65
IR     2025250    183200   20.1800  147.9300       7.5       114       807        66
IR     2025250    183200   20.1700  147.2300       9.7       116       737        74
IR     2025250    183200   20.1500  147.1300      10.8       119       761        88
IR     2025250    183200   20.2200  146.3400      13.5       132       906        79
IR     2025250    183200   20.2100  145.5300      11.8       101       281        66
IR     2025250    183200   20.1300  145.3800      16.5       101       286        80
IR     2025250    183200   20.1700  145.3100      17.0       105       291        83
IR     2025250    183200   20.2100  145.1900      15.9       111       301        78
IR     2025250    183200   20.1200  144.8900      17.4       110       246        82
IR     2025250    183200   20.1600  144.8100      17.5       111       259        82
IR     2025250    183200   20.2000  144.7000      16.9       113       272        79
IR     2025250    183200   20.2000  144.6000      17.2       114       250        77
IR     2025250    183200   20.2000  144.3800      17.0       117       241        81
IR     2025250    183200   20.1800  144.2600      13.3       129       239        93
IR     2025250    183200   20.1200  144.1200       8.5       177       239        90
IR     2025250    183200   20.1200  143.8500       8.5       158       250        94
IR     2025250    183200   20.2000  143.7700       7.8       156       268        75
IR     2025250    183200   20.1800  143.7100       7.2       159       265        74
IR     2025250    183200   20.1700  143.6100       6.3       169       266        78
IR     2025250    183200   20.1100  143.4300       4.3       174       265        86
IR     2025250    183200   20.1300  143.4000       4.4       178       269        86
IR     2025250    183200   20.0800  148.1000       6.8        96       924        79
IR     2025250    183200   20.1400  147.9400       6.6       107       834        63
IR     2025250    183200   20.1100  147.9000       6.4        95       740        69
IR     2025250    183200   20.0900  147.8200       6.1        82       706        87
IR     2025250    183200   20.0800  146.4700      11.7       120       918        82
IR     2025250    183200   20.0300  146.0100      14.5       134       339        83
IR     2025250    183200   20.0500  145.5300      15.2       106       261        79
IR     2025250    183200   20.0300  145.3400      16.4       111       271        80
IR     2025250    183200   20.0500  145.1600      18.4       108       264        82
IR     2025250    183200   20.1000  144.9100      17.6       109       236        82
IR     2025250    183200   20.0600  144.8100      17.2       123       226        77
IR     2025250    183200   20.0400  144.7700      16.5       130       225        73
IR     2025250    183200   20.1000  144.5900      16.5       126       229        77
IR     2025250    183200   20.0400  144.5500      14.9       140       228        72
IR     2025250    183200   20.0200  144.4300      12.9       149       233        89
IR     2025250    183200   20.0200  144.3500      12.8       140       234        95
IR     2025250    183200   20.0200  144.2700      10.5       151       234        98
IR     2025250    183200   20.0200  144.1000      10.8       216       237        71
IR     2025250    183200   20.0400  144.0800      10.8       217       237        74
IR     2025250    183200   20.0400  143.9000       9.4       159       244        96
IR     2025250    183200   20.0800  143.8400       9.0       157       247        93
IR     2025250    183200   20.0300  143.5900       6.6       153       255        75
IR     2025250    183200   20.0100  143.5100       5.4       154       251        71
IR     2025250    183200   20.0100  143.2300       5.1       197       269        67
IR     2025250    183200   19.9900  150.4400       4.5        71       961        92
IR     2025250    183200   19.9500  147.8500       7.5        56       811        85
IR     2025250    183200   19.9500  147.7500       7.2        61       719        70
IR     2025250    183200   20.0100  147.6500       6.9        68       720        87
IR     2025250    183200   19.9400  146.4800      10.2       118       912        86
IR     2025250    183200   19.9800  146.4400      10.7       120       901        86
IR     2025250    183200   19.9500  146.0800      13.9       136       345        85
IR     2025250    183200   19.9500  146.0600      14.1       136       340        84
IR     2025250    183200   20.0100  145.9300      14.9       129       323        81
IR     2025250    183200   19.9300  145.8000      16.1       116       264        79
IR     2025250    183200   19.9300  145.3300      15.0       125       245        89
IR     2025250    183200   19.9300  145.3100      15.2       123       239        86
IR     2025250    183200   19.9900  145.2200      17.2       112       240        85
IR     2025250    183200   19.9300  145.0700      16.6       118       221        82
IR     2025250    183200   20.0000  144.9400      16.6       118       226        82
IR     2025250    183200   19.9800  144.8400      16.1       134       224        73
IR     2025250    183200   20.0000  144.8200      16.3       133       225        73
IR     2025250    183200   20.0000  144.7200      16.4       137       225        71
IR     2025250    183200   20.0000  144.5900      15.2       140       228        77
IR     2025250    183200   20.0000  144.5100      13.3       149       231        90
IR     2025250    183200   20.0000  144.3500      12.6       141       234        98
IR     2025250    183200   20.0000  144.2900      11.3       148       234        99
IR     2025250    183200   20.0000  144.1700       8.6       185       235        89
IR     2025250    183200   19.9800  144.0900      11.9       222       237        64
IR     2025250    183200   19.9200  143.7800       8.6       165       250        83
IR     2025250    183200   20.0000  143.7400       8.9       147       253        81
IR     2025250    183200   19.9900  143.5900       6.9       149       252        75
IR     2025250    183200   19.9100  143.5400       6.1       156       252        85
IR     2025250    183200   19.9900  143.4300       4.5       168       251        77
IR     2025250    183200   19.9700  150.4200       4.8        71       966        95
IR     2025250    183200   19.9200  148.0200       7.2        84       961        74
IR     2025250    183200   19.8900  147.9400       8.0        66       947        91
IR     2025250    183200   19.8500  147.7000       8.3        53       746        77
IR     2025250    183200   19.8500  147.1800       8.8        99       824        85
IR     2025250    183200   19.9200  146.4900      10.1       117       916        85
IR     2025250    183200   19.9000  146.3900      10.5       126       862        86
IR     2025250    183200   19.9200  146.1200      14.0       138       353        85
IR     2025250    183200   19.8300  145.9300      15.4       129       285        84
IR     2025250    183200   19.8300  145.9000      15.0       125       260        93
IR     2025250    183200   19.8500  145.7400      14.6       112       237        81
IR     2025250    183200   19.8700  145.7000      15.0       110       237        82
IR     2025250    183200   19.8900  145.6000      15.3       117       237        85
IR     2025250    183200   19.8300  145.4400      16.4       131       232        86
IR     2025250    183200   19.8300  145.4200      16.3       132       230        85
IR     2025250    183200   19.9100  145.3300      14.7       126       237        88
IR     2025250    183200   19.8500  145.1700      14.1       127       222        81
IR     2025250    183200   19.8900  145.0500      15.5       126       220        77
IR     2025250    183200   19.9100  145.0300      15.7       125       220        76
IR     2025250    183200   19.8600  144.9300      14.9       135       221        79
IR     2025250    183200   19.9000  144.8000      15.1       139       224        73
IR     2025250    183200   19.8800  144.7400      14.8       137       225        75
IR     2025250    183200   19.8200  144.6000      12.6       133       234        93
IR     2025250    183200   19.8200  144.4800      11.1       139       236        98
IR     2025250    183200   19.8200  144.4000      11.3       142       236        97
IR     2025250    183200   19.8200  144.2600      10.5       155       236        90
IR     2025250    183200   19.8200  144.2400       9.9       162       236        89
IR     2025250    183200   19.8500  143.4600       5.3       167       252        85
IR     2025250    183200   19.8100  143.4000       5.2       177       255        85
IR     2025250    183200   19.8100  143.2800       5.3       190       255        83
IR     2025250    183200   19.8500  143.2300       5.5       202       252        83
IR     2025250    183200   19.7500  147.9500       8.6        62       969        87
IR     2025250    183200   19.8300  147.8000       8.4        55       896        87
IR     2025250    183200   19.7900  147.7500       8.8        54       895        79
IR     2025250    183200   19.8100  147.6000       7.9        61       743        84
IR     2025250    183200   19.7500  147.5500       8.4        59       758        89
IR     2025250    183200   19.7500  147.3700       8.9        66       747        85
IR     2025250    183200   19.7500  147.2700       8.0        81       820        93
IR     2025250    183200   19.7900  147.2000       8.3        89       850        93
IR     2025250    183200   19.7600  146.5400       9.6       117       927        81
IR     2025250    183200   19.7400  146.4600       8.7       115       905        81
IR     2025250    183200   19.7700  145.9700      15.3       135       288        80
IR     2025250    183200   19.7700  145.8700      13.7       122       248        95
IR     2025250    183200   19.7900  145.8500      14.2       120       246        92
IR     2025250    183200   19.7900  145.7200      13.7       115       237        78
IR     2025250    183200   19.7900  145.4800      16.4       130       233        85
IR     2025250    183200   19.7900  145.3000      13.9       133       223        80
IR     2025250    183200   19.7900  145.2800      13.8       132       223        78
IR     2025250    183200   19.8100  145.1500      14.2       129       223        83
IR     2025250    183200   19.8100  145.0900      14.5       128       224        83
IR     2025250    183200   19.7400  144.9100      13.6       124       228        90
IR     2025250    183200   19.7200  144.8100      12.8       128       231        95
IR     2025250    183200   19.7200  144.7300      12.9       128       235        94
IR     2025250    183200   19.7200  144.6900      12.8       127       236        95
IR     2025250    183200   19.8000  144.5600      12.4       131       236        94
IR     2025250    183200   19.8000  144.4800      11.6       134       237        97
IR     2025250    183200   19.7200  144.3900      13.6       121       241        94
IR     2025250    183200   19.7600  144.2200      10.3       156       243        98
IR     2025250    183200   19.7200  143.7700      11.6       226       241        79
IR     2025250    183200   19.7200  143.7500      11.5       226       242        80
IR     2025250    183200   19.7900  143.5800       6.8       197       252        84
IR     2025250    183200   19.7900  143.5600       6.5       196       252        84
IR     2025250    183200   19.7500  143.2000       5.2       195       255        86
IR     2025250    183200   19.7300  142.6200       4.9       154       294        73
IR     2025250    183200   19.7300  147.9500       8.8        61       967        84
IR     2025250    183200   19.7300  147.8500       9.8        53       939        81
IR     2025250    183200   19.7100  147.7900       9.7        54       915        77
IR     2025250    183200   19.6900  147.6900       9.4        51       892        76
IR     2025250    183200   19.6700  147.5700       8.3        58       855        90
IR     2025250    183200   19.6900  147.5300       8.4        60       796        91
IR     2025250    183200   19.7100  147.3900       9.2        66       757        93
IR     2025250    183200   19.6900  147.2500       8.0        89       845        89
IR     2025250    183200   19.6700  147.2100       7.8        90       860        86
IR     2025250    183200   19.6500  147.0700       8.3       104       911        81
IR     2025250    183200   19.6400  146.9900       9.1        92       889        79
IR     2025250    183200   19.6400  146.8900       9.9       110       905        84
IR     2025250    183200   19.7200  146.7600      11.4       118       942        62
IR     2025250    183200   19.6400  146.6700      12.3       127       919        60
IR     2025250    183200   19.6400  146.5100      10.8       127       876        82
IR     2025250    183200   19.6400  146.3600      14.4       128       414        84
IR     2025250    183200   19.7200  146.2800      13.4       131       405        84
IR     2025250    183200   19.7100  145.5100      16.0       135       229        92
IR     2025250    183200   19.7100  145.4100      15.6       132       225        92
IR     2025250    183200   19.6900  145.3100      14.4       125       222        97
IR     2025250    183200   19.6500  145.2100      15.0       110       228        91
IR     2025250    183200   19.6300  145.0900      16.4       104       236        85
IR     2025250    183200   19.6500  145.0400      16.6       105       236        85
IR     2025250    183200   19.6900  144.9400      15.1       113       234        91
IR     2025250    183200   19.7000  144.7900      13.2       125       233        98
IR     2025250    183200   19.6200  144.4900      16.3       110       245        80
IR     2025250    183200   19.6200  144.4500      16.8       110       245        80
IR     2025250    183200   19.6800  144.3700      15.5       116       241        89
IR     2025250    183200   19.6200  144.2300      10.7       141       246        80
IR     2025250    183200   19.7000  144.1000       8.8       189       243        75
IR     2025250    183200   19.6400  143.8600      11.3       222       241        81
IR     2025250    183200   19.7000  143.7300      11.8       226       244        82
IR     2025250    183200   19.6800  143.6900      11.9       225       245        83
IR     2025250    183200   19.6100  143.5900      11.4       223       246        83
IR     2025250    183200   19.6900  143.1000       5.3       198       254        86
IR     2025250    183200   19.6900  143.0400       5.2       193       253        87
IR     2025250    183200   19.6100  142.9400       4.8       193       253        83
IR     2025250    183200   19.6700  142.8100       4.3       172       258        66
IR     2025250    183200   19.6900  142.7700       4.6       164       264        70
IR     2025250    183200   19.5500  147.6000       6.4        82       884        80
IR     2025250    183200   19.5900  147.5200       6.6        86       857        82
IR     2025250    183200   19.5700  147.4000       7.9        88       845        86
IR     2025250    183200   19.5900  147.3000       7.9        89       860        88
IR     2025250    183200   19.5500  147.2400       8.0        90       861        87
IR     2025250    183200   19.6300  147.1700       7.7        94       859        88
IR     2025250    183200   19.5600  147.0000       9.4        93       796        86
IR     2025250    183200   19.5400  146.7200      12.4       130       845        84
IR     2025250    183200   19.6200  146.6900      12.5       127       899        61
IR     2025250    183200   19.5400  146.5500      12.5       132       768        85
IR     2025250    183200   19.6200  146.4300      13.6       128       440        84
IR     2025250    183200   19.6200  146.4100      14.0       128       435        84
IR     2025250    183200   19.6000  146.0600      14.3       141       290        80
IR     2025250    183200   19.5700  145.5000      16.0       133       227        94
IR     2025250    183200   19.5300  145.3200      15.7       115       235        95
IR     2025250    183200   19.5500  145.2500      16.6       105       239        86
IR     2025250    183200   19.5900  145.1300      17.7       101       239        85
IR     2025250    183200   19.5900  145.0300      19.0        99       243        85
IR     2025250    183200   19.6100  145.0200      18.3       101       242        86
IR     2025250    183200   19.5300  144.9100      22.0        96       246        80
IR     2025250    183200   19.5400  144.7800      18.7       103       244        84
IR     2025250    183200   19.5600  144.6600      13.7       114       244        89
IR     2025250    183200   19.5400  144.5400      14.6       111       245        88
IR     2025250    183200   19.5600  144.4400      17.2       110       246        84
IR     2025250    183200   19.5600  144.4200      17.7       109       246        83
IR     2025250    183200   19.5800  144.2900      15.1       120       247        83
IR     2025250    183200   19.5400  144.1700      10.1       151       240        69
IR     2025250    183200   19.5200  144.0500       9.1       173       239        61
IR     2025250    183200   19.5600  143.9500       8.7       209       245        61
IR     2025250    183200   19.5600  143.9400       8.9       209       246        64
IR     2025250    183200   19.6000  143.7600      12.3       229       245        81
IR     2025250    183200   19.6000  143.7400      12.2       228       246        81
IR     2025250    183200   19.5200  143.6400      11.0       222       258        80
IR     2025250    183200   19.5900  143.5500      10.9       219       246        84
IR     2025250    183200   19.5500  142.8800       4.6       197       257        72
IR     2025250    183200   19.5100  142.8200       4.1       189       262        75
IR     2025250    183200   19.5900  142.6500       5.1       160       274        69
IR     2025250    183200   19.5900  142.6100       5.1       161       279        72
IR     2025250    183200   19.4900  147.3500       8.3       102       871        77
IR     2025250    183200   19.5300  147.2600       8.0        92       865        85
IR     2025250    183200   19.4700  147.1900       8.4        90       822        79
IR     2025250    183200   19.5300  147.0600       8.8        93       782        84
IR     2025250    183200   19.5200  146.9400       9.9        98       803        82
IR     2025250    183200   19.4400  146.8600      11.4       121       822        83
IR     2025250    183200   19.4400  146.7800      11.3       120       796        86
IR     2025250    183200   19.5200  146.7200      12.3       128       834        84
IR     2025250    183200   19.5200  146.5600      12.9       132       754        85
IR     2025250    183200   19.5200  146.4500      13.6       133       427        75
IR     2025250    183200   19.5200  146.4300      13.8       133       416        75
IR     2025250    183200   19.4400  146.1400      13.3       138       318        84
IR     2025250    183200   19.5100  145.8200      14.8       139       239        89
IR     2025250    183200   19.5100  145.7600      15.3       136       235        88
IR     2025250    183200   19.4700  145.6200      16.1       136       226        89
IR     2025250    183200   19.4900  145.5800      16.0       138       225        89
IR     2025250    183200   19.4700  145.4000      15.0       125       231        94
IR     2025250    183200   19.4900  145.3600      15.3       119       236        92
IR     2025250    183200   19.4700  145.2600      17.5        98       248        78
IR     2025250    183200   19.5100  145.1900      19.2        93       246        76
IR     2025250    183200   19.5100  145.0100      21.5        93       247        82
IR     2025250    183200   19.4300  144.9100      23.3        99       240        79
IR     2025250    183200   19.4700  144.8500      23.9        99       243        80
IR     2025250    183200   19.4800  144.7900      21.8       101       244        80
IR     2025250    183200   19.5000  144.7000      16.5       106       244        80
IR     2025250    183200   19.4200  144.5100      13.0       113       241        79
IR     2025250    183200   19.4800  144.4600      15.0       114       245        86
IR     2025250    183200   19.4600  144.3200      15.0       122       235        82
IR     2025250    183200   19.4600  144.3000      14.1       126       233        83
IR     2025250    183200   19.5000  144.1300      10.2       158       234        75
IR     2025250    183200   19.5000  144.0700       9.8       167       235        72
IR     2025250    183200   19.5000  143.9700       8.7       188       237        61
IR     2025250    183200   19.5000  143.6400      10.4       222       260        78
IR     2025250    183200   19.4800  143.6200       9.7       220       261        74
IR     2025250    183200   19.4900  143.1300       5.9       165       267        88
IR     2025250    183200   19.4700  142.9900       5.3       194       269        86
IR     2025250    183200   19.4500  142.9700       5.3       197       269        85
IR     2025250    183200   19.4700  142.8200       4.2       196       263        81
IR     2025250    183200   19.4300  142.7800       4.1       186       267        85
IR     2025250    183200   19.3700  147.3600       9.9       125       878        84
IR     2025250    183200   19.3500  147.2400       9.2       109       841        82
IR     2025250    183200   19.4300  147.1700       8.5        95       778        81
IR     2025250    183200   19.4300  147.0900       8.9       103       759        80
IR     2025250    183200   19.3700  146.9700      10.9       122       783        83
IR     2025250    183200   19.4000  146.8700      11.3       123       822        85
IR     2025250    183200   19.3400  146.5900      10.8       110       666        80
IR     2025250    183200   19.4000  146.3600      14.0       129       374        83
IR     2025250    183200   19.4000  146.2600      12.4       131       353        84
IR     2025250    183200   19.3900  145.6900      16.4       135       227        88
IR     2025250    183200   19.3500  145.5700      15.9       134       221        93
IR     2025250    183200   19.3900  145.4500      15.4       126       233        96
IR     2025250    183200   19.4100  145.4200      15.1       121       239        95
IR     2025250    183200   19.3300  145.2900      17.3        97       247        85
IR     2025250    183200   19.3900  145.2200      19.4        90       248        71
IR     2025250    183200   19.3700  145.0800      21.4        94       241        80
IR     2025250    183200   19.4100  144.9400      22.9        98       239        79
IR     2025250    183200   19.4100  144.9200      23.1        98       238        79
IR     2025250    183200   19.3500  144.7600      20.1       106       219        71
IR     2025250    183200   19.3600  144.7100      17.5       105       224        67
IR     2025250    183200   19.4000  144.6100      12.8       111       235        76
IR     2025250    183200   19.3200  144.4500      12.3       133       225        94
IR     2025250    183200   19.3400  144.4300      12.9       133       228        87
IR     2025250    183200   19.3400  144.3300      13.0       140       226        84
IR     2025250    183200   19.4000  144.1600       9.9       168       228        73
IR     2025250    183200   19.3200  144.1000      10.4       162       225        71
IR     2025250    183200   19.3600  143.9800       9.4       175       227        63
IR     2025250    183200   19.3400  143.8900       9.4       192       227        67
IR     2025250    183200   19.4000  143.6700       7.9       210       264        61
IR     2025250    183200   19.3800  143.6500       7.4       210       264        61
IR     2025250    183200   19.4000  143.5600       6.9       205       263        69
IR     2025250    183200   19.3500  143.2800       7.3       167       256        81
IR     2025250    183200   19.3700  143.1300       6.2       172       262        86
IR     2025250    183200   19.3100  143.0500       5.8       193       265        86
IR     2025250    183200   19.3700  142.9300       4.8       197       269        84
IR     2025250    183200   19.2700  147.4000      11.7       129       874        81
IR     2025250    183200   19.3300  147.2600       9.6       113       867        83
IR     2025250    183200   19.3300  147.1200       9.0       110       740        74
IR     2025250    183200   19.2500  147.0200      10.5       110       768        64
IR     2025250    183200   19.2700  147.0000      10.7       112       794        65
IR     2025250    183200   19.2600  146.7000      10.0       105       652        83
IR     2025250    183200   19.3200  146.6100      10.4       107       662        82
IR     2025250    183200   19.2800  146.4700      14.7       140       403        74
IR     2025250    183200   19.2600  146.3500      15.6       140       374        81
IR     2025250    183200   19.2800  146.3300      14.9       139       370        79
IR     2025250    183200   19.2600  146.0500      17.5       164       239        81
IR     2025250    183200   19.3000  145.9000      17.3       157       233        79
IR     2025250    183200   19.2500  145.8200      15.8       147       232        78
IR     2025250    183200   19.2500  145.7600      15.6       138       231        84
IR     2025250    183200   19.3100  145.6100      16.3       133       222        93
IR     2025250    183200   19.2500  145.5600      16.2       129       225        89
IR     2025250    183200   19.2300  145.4000      16.1       116       237        91
IR     2025250    183200   19.2900  144.9400      21.0       105       211        77
IR     2025250    183200   19.3100  144.9200      21.3       104       214        78
IR     2025250    183200   19.2300  144.7800      17.6       119       203        87
IR     2025250    183200   19.2700  144.7000      14.9       119       209        82
IR     2025250    183200   19.2800  144.6200      12.3       123       215        91
IR     2025250    183200   19.3000  144.4700      11.6       133       221        95
IR     2025250    183200   19.3000  144.3900      13.7       137       220        89
IR     2025250    183200   19.2800  144.2500      12.1       154       217        84
IR     2025250    183200   19.2800  144.2100      12.0       151       217        86
IR     2025250    183200   19.2800  144.0800      11.1       161       221        77
IR     2025250    183200   19.2600  143.9800      11.9       165       226        78
IR     2025250    183200   19.2600  143.9000      11.0       182       228        78
IR     2025250    183200   19.3000  143.8000       9.1       200       227        62
IR     2025250    183200   19.2200  143.4500       6.1       199       237        68
IR     2025250    183200   19.2200  143.3500       4.9       178       249        83
IR     2025250    183200   19.2300  143.2400       5.4       179       258        79
IR     2025250    183200   19.2900  143.0800       6.2       189       263        87
IR     2025250    183200   19.2100  142.6300       4.2       188       288        80
IR     2025250    183200   19.1900  147.5700       8.2       104       840        84
IR     2025250    183200   19.2100  147.4100      11.2       124       856        82
IR     2025250    183200   19.1900  147.3900      11.4       124       844        84
IR     2025250    183200   19.1900  147.2900      10.5       115       789        78
IR     2025250    183200   19.1700  147.1900      10.9       110       732        85
IR     2025250    183200   19.2300  147.0200      10.8       109       791        61
IR     2025250    183200   19.1500  146.9900      12.4        92       798        75
IR     2025250    183200   19.1700  146.8400      12.2        97       800        81
IR     2025250    183200   19.1600  146.5000      12.6       133       400        83
IR     2025250    183200   19.1400  146.3400      16.2       139       371        82
IR     2025250    183200   19.1400  146.2600      17.8       151       348        82
IR     2025250    183200   19.2000  146.1500      17.4       158       271        84
IR     2025250    183200   19.2200  146.1300      16.9       158       265        83
IR     2025250    183200   19.1600  145.9500      14.6       152       230        83
IR     2025250    183200   19.1400  145.8700      12.7       139       234        85
IR     2025250    183200   19.1600  145.7900      13.0       131       232        87
IR     2025250    183200   19.2100  145.7400      15.0       132       230        86
IR     2025250    183200   19.2100  145.6000      15.5       124       226        74
IR     2025250    183200   19.1300  145.4800      16.2       126       222        75
IR     2025250    183200   19.1900  145.4200      15.7       117       230        88
IR     2025250    183200   19.1300  145.2800      17.1       106       208        80
IR     2025250    183200   19.1500  145.1800      20.7        90       201        71
IR     2025250    183200   19.1900  145.1500      21.7        91       208        71
IR     2025250    183200   19.1900  145.0500      20.4        98       201        77
IR     2025250    183200   19.1700  144.9500      18.0       111       196        85
IR     2025250    183200   19.1300  144.7900      14.2       129       194        93
IR     2025250    183200   19.1500  144.7300      13.4       135       197        89
IR     2025250    183200   19.1300  144.5800      10.2       153       201        90
IR     2025250    183200   19.1300  144.5600      10.2       154       203        90
IR     2025250    183200   19.1600  144.4600      12.0       146       210        91
IR     2025250    183200   19.1200  144.2800      13.9       153       211        83
IR     2025250    183200   19.1200  144.2600      14.1       153       211        79
IR     2025250    183200   19.2000  144.1700      13.6       151       216        78
IR     2025250    183200   19.1200  143.9900      14.9       154       219        82
IR     2025250    183200   19.1200  143.9300      14.2       156       223        89
IR     2025250    183200   19.1600  143.8200      11.2       166       230        79
IR     2025250    183200   19.1400  143.7800      10.8       163       230        80
IR     2025250    183200   19.2000  143.4900       6.6       206       226        62
IR     2025250    183200   19.1800  143.3900       5.7       199       235        72
IR     2025250    183200   19.1900  142.6700       4.1       187       283        77
IR     2025250    183200   19.1500  142.5900       4.1       189       298        79
IR     2025250    183200   19.0900  147.6800       8.4        67       872        78
IR     2025250    183200   19.0700  147.6600       8.2        74       869        77
IR     2025250    183200   19.0500  147.5200       8.0        98       808        74
IR     2025250    183200   19.0500  147.4400       8.7       108       776        77
IR     2025250    183200   19.1300  147.2900      10.3       108       736        82
IR     2025250    183200   19.1300  147.2700      10.4       108       733        82
IR     2025250    183200   19.0500  147.0800      10.8        85       741        94
IR     2025250    183200   19.0500  147.0600      11.0        87       751        90
IR     2025250    183200   19.0800  146.5500      10.6       111       435        76
IR     2025250    183200   19.0800  146.4600      13.3       131       386        82
IR     2025250    183200   19.1200  146.3400      16.7       142       372        81
IR     2025250    183200   19.0600  146.2200      17.6       153       320        84
IR     2025250    183200   19.0800  146.1800      16.9       156       292        84
IR     2025250    183200   19.1000  146.0600      14.5       158       230        82
IR     2025250    183200   19.1200  145.9500      13.4       147       231        83
IR     2025250    183200   19.1000  145.8900      12.3       135       236        86
IR     2025250    183200   19.0400  145.7600      12.7       126       236        89
IR     2025250    183200   19.0400  145.6500      13.8       120       229        87
IR     2025250    183200   19.0500  145.5300      16.1       131       216        76
IR     2025250    183200   19.1100  145.5000      16.4       127       222        75
IR     2025250    183200   19.0900  145.3400      16.2       121       207        74
IR     2025250    183200   19.1100  145.3000      16.6       111       208        77
IR     2025250    183200   19.1100  145.2200      18.8        96       197        68
IR     2025250    183200   19.0500  145.0600      18.2        98       190        75
IR     2025250    183200   19.0500  144.9400      16.4       114       189        87
IR     2025250    183200   19.0300  144.9200      15.5       116       188        87
IR     2025250    183200   19.0900  144.7700      12.6       137       192        95
IR     2025250    183200   19.0900  144.6500       9.7       164       194        89
IR     2025250    183200   19.0900  144.6300       9.7       166       194        88
IR     2025250    183200   19.0700  144.4800       9.4       173       204        85
IR     2025250    183200   19.0200  144.4100       9.1       184       203        84
IR     2025250    183200   19.1000  144.3000      13.3       154       211        85
IR     2025250    183200   19.0400  144.1600      16.7       152       217        86
IR     2025250    183200   19.0200  144.1200      16.3       155       219        83
IR     2025250    183200   19.1000  143.9900      15.3       153       219        85
IR     2025250    183200   19.1000  143.9500      15.0       153       221        89
IR     2025250    183200   19.1000  143.8300      12.9       157       229        87
IR     2025250    183200   19.1000  143.7600      11.0       157       229        85
IR     2025250    183200   19.0600  143.6600       8.2       170       227        76
IR     2025250    183200   19.0400  143.3100       6.0       205       223        61
IR     2025250    183200   19.0600  143.0500       4.0       193       264        78
IR     2025250    183200   19.0100  147.5200       7.8        90       808        84
IR     2025250    183200   19.0300  147.4400       8.3       102       760        80
IR     2025250    183200   19.0300  147.3800       8.7        97       732        77
IR     2025250    183200   18.9500  147.2100       9.3        75       710        96
IR     2025250    183200   18.9500  147.1000      10.1        80       727        90
IR     2025250    183200   18.9700  147.0400      10.8        90       745        87
IR     2025250    183200   18.9500  146.9000      12.3        87       705        69
IR     2025250    183200   18.9800  146.6100      10.8        98       445        87
IR     2025250    183200   18.9400  146.3300      14.1       131       364        83
IR     2025250    183200   18.9400  146.3100      14.0       133       360        83
IR     2025250    183200   19.0200  146.2200      16.7       151       316        82
IR     2025250    183200   19.0200  146.0800      12.3       146       231        83
IR     2025250    183200   19.0000  145.9600      10.9       130       235        87
IR     2025250    183200   18.9800  145.9000      10.2       119       238        88
IR     2025250    183200   19.0200  145.7600      12.4       125       237        89
IR     2025250    183200   19.0200  145.6500      13.6       120       229        87
IR     2025250    183200   18.9600  145.6000      14.5       118       213        86
IR     2025250    183200   19.0100  145.5300      16.1       133       208        80
IR     2025250    183200   18.9700  145.3700      15.5       133       198        81
IR     2025250    183200   19.0100  145.3300      15.6       127       198        81
IR     2025250    183200   18.9300  145.1900      17.9        99       188        80
IR     2025250    183200   18.9900  145.1000      19.2        93       188        70
IR     2025250    183200   18.9700  145.0000      17.0       102       181        78
IR     2025250    183200   18.9900  144.8600      12.6       125       180        93
IR     2025250    183200   18.9900  144.8400      12.1       127       179        94
IR     2025250    183200   19.0100  144.6900       8.7       160       186        81
IR     2025250    183200   18.9700  144.4100       8.8       211       197        72
IR     2025250    183200   19.0000  144.3400       9.7       185       206        65
IR     2025250    183200   18.9800  144.1200      16.1       158       219        76
IR     2025250    183200   18.9600  144.0000      14.4       159       223        75
IR     2025250    183200   19.0000  143.9500      14.2       157       224        85
IR     2025250    183200   19.0000  143.8700      12.9       154       225        78
IR     2025250    183200   18.9200  143.7700      12.2       153       224        85
IR     2025250    183200   18.9200  143.6300       9.4       166       226        87
IR     2025250    183200   18.9000  147.5700       8.3        77       840        86
IR     2025250    183200   18.8700  147.1100      10.3        67       714        95
IR     2025250    183200   18.9300  147.0400      10.5        88       734        89
IR     2025250    183200   18.8700  146.9100      11.0        92       675        71
IR     2025250    183200   18.8900  146.8900      11.5        88       660        75
IR     2025250    183200   18.9000  146.5800      11.0        92       415        86
IR     2025250    183200   18.9200  146.4600      11.3       108       378        70
IR     2025250    183200   18.9200  146.3300      13.5       129       363        84
IR     2025250    183200   18.9200  146.3100      13.4       131       357        84
IR     2025250    183200   18.9200  146.2100      13.4       141       279        80
IR     2025250    183200   18.9000  146.1100      10.0       131       234        87
IR     2025250    183200   18.8400  145.7900      12.0       123       234        73
IR     2025250    183200   18.8400  145.6700      12.9       119       214        71
IR     2025250    183200   18.9200  145.6200      14.0       117       212        88
IR     2025250    183200   18.8800  145.5200      15.3       131       202        83
IR     2025250    183200   18.8300  145.3600      15.3       133       192        88
IR     2025250    183200   18.8700  145.3200      15.3       131       192        88
IR     2025250    183200   18.9100  145.2100      17.2       104       188        76
IR     2025250    183200   18.8500  145.0700      21.2        96       170        81
IR     2025250    183200   18.8700  145.0100      20.9        95       170        75
IR     2025250    183200   18.9100  144.8800      13.4       113       169        83
IR     2025250    183200   18.8900  144.8400      12.7       114       167        76
IR     2025250    183200   18.9100  144.6800       6.9       149       170        65
IR     2025250    183200   18.9000  144.1000      16.7       159       217        61
IR     2025250    183200   18.8800  144.0600      17.7       158       220        62
IR     2025250    183200   18.9000  143.9400      13.9       161       222        91
IR     2025250    183200   18.8200  143.8600      12.4       161       217        92
IR     2025250    183200   18.9000  143.7900      12.6       155       222        87
IR     2025250    183200   18.8200  143.6100      11.2       166       226        88
IR     2025250    183200   18.8600  143.5300      12.1       173       228        83
IR     2025250    183200   18.9000  143.4200       9.9       190       225        67
IR     2025250    183200   18.8200  143.1200       5.5       185       241        83
IR     2025250    183200   18.8200  143.1000       5.7       182       243        86
IR     2025250    183200   18.8700  142.5800       5.1       156       315        60
IR     2025250    183200   18.7800  147.6600       9.2        58       874        90
IR     2025250    183200   18.7600  147.5900       8.2        66       842        87
IR     2025250    183200   18.8000  147.5200       8.1        64       788        90
IR     2025250    183200   18.7500  147.4200       8.2        65       737        95
IR     2025250    183200   18.7900  147.3200       9.7        55       723        91
IR     2025250    183200   18.7900  147.1600      10.4        62       707        96
IR     2025250    183200   18.8300  147.1100      10.3        67       715        96
IR     2025250    183200   18.7900  146.9700      10.3       102       686        88
IR     2025250    183200   18.7500  146.7100      11.9        65       431        92
IR     2025250    183200   18.7900  146.6100      11.2        71       400        97
IR     2025250    183200   18.7500  146.5500      11.2        63       377        93
IR     2025250    183200   18.7500  146.4300      12.0        59       365        91
IR     2025250    183200   18.7800  146.3800      10.4        84       364        82
IR     2025250    183200   18.7600  146.0400       8.8       100       235        89
IR     2025250    183200   18.8200  145.8100      11.7       119       233        82
IR     2025250    183200   18.8200  145.6900      12.8       117       213        72
IR     2025250    183200   18.8200  145.5900      14.2       121       203        84
IR     2025250    183200   18.7400  145.4500      12.9       125       191        83
IR     2025250    183200   18.8100  145.3800      14.6       132       192        88
IR     2025250    183200   18.8100  145.2800      14.9       130       186        74
IR     2025250    183200   18.8100  145.1800      17.3       106       174        65
IR     2025250    183200   18.7500  145.1400      17.8       107       163        80
IR     2025250    183200   18.8100  145.0500      22.4        95       164        80
IR     2025250    183200   18.7300  144.9100      18.2        98       157        84
IR     2025250    183200   18.7900  144.7700      10.2       114       162        73
IR     2025250    183200   18.7300  143.9900      12.9       176       206        63
IR     2025250    183200   18.7200  143.9100      13.3       172       210        88
IR     2025250    183200   18.8000  143.8600      12.7       163       217        91
IR     2025250    183200   18.8000  143.7000      10.5       161       218        88
IR     2025250    183200   18.7200  143.6000      11.4       168       223        89
IR     2025250    183200   18.7800  143.5700      11.8       167       229        86
IR     2025250    183200   18.7200  143.4300      10.8       180       244        87
IR     2025250    183200   18.8000  143.3100       9.1       192       236        69
IR     2025250    183200   18.7600  143.0800       6.3       185       246        83
IR     2025250    183200   18.7200  143.0200       6.5       188       252        80
IR     2025250    183200   18.8000  142.8500       4.7       180       268        86
IR     2025250    183200   18.6600  147.6700      11.2        39       875        93
IR     2025250    183200   18.7000  147.5900       8.6        57       833        84
IR     2025250    183200   18.7400  147.4500       7.8        65       758        96
IR     2025250    183200   18.6600  147.3700       8.8        45       751        93
IR     2025250    183200   18.6600  147.3300       9.6        41       759        93
IR     2025250    183200   18.6900  147.1600      12.6        42       711        89
IR     2025250    183200   18.6500  147.0500      14.1        40       708        85
IR     2025250    183200   18.7300  147.0000      11.1        56       694        97
IR     2025250    183200   18.7100  146.9400      13.4        64       430        85
IR     2025250    183200   18.6500  146.7600      13.7        61       425        88
IR     2025250    183200   18.7100  146.7000      12.3        62       426        93
IR     2025250    183200   18.7300  146.4100      12.3        54       364        94
IR     2025250    183200   18.6400  146.1900      14.2        31       261        87
IR     2025250    183200   18.6800  145.9200       9.9        98       227        84
IR     2025250    183200   18.6400  145.7800      11.7       101       210        62
IR     2025250    183200   18.7000  145.7200      12.3       100       207        63
IR     2025250    183200   18.6400  145.6200      12.2        99       198        85
IR     2025250    183200   18.7000  145.4900      12.0       121       191        86
IR     2025250    183200   18.6800  145.3500      14.1       148       180        76
IR     2025250    183200   18.7000  145.3300      14.5       147       180        77
IR     2025250    183200   18.6400  145.1700      15.1       126       159        80
IR     2025250    183200   18.6700  145.0600      19.7       103       155        84
IR     2025250    183200   18.6900  144.9800      23.1        95       154        81
IR     2025250    183200   18.7100  144.9200      19.8        97       156        84
IR     2025250    183200   18.6300  144.3600       8.9       141       166        74
IR     2025250    183200   18.7100  144.1300      16.5       153       183        60
IR     2025250    183200   18.7100  144.0300      15.5       165       199        77
IR     2025250    183200   18.7100  144.0100      12.9       174       202        61
IR     2025250    183200   18.6500  143.8500      13.8       172       206        86
IR     2025250    183200   18.6600  143.8100      13.5       169       210        89
IR     2025250    183200   18.7000  143.6400      11.6       168       219        88
IR     2025250    183200   18.7000  143.6200      11.6       169       220        88
IR     2025250    183200   18.6800  143.5000      11.7       178       234        87
IR     2025250    183200   18.6800  143.4300      10.4       184       244        86
IR     2025250    183200   18.6200  143.0000       5.5       189       254        68
IR     2025250    183200   18.7000  142.7900       4.6       166       266        83
IR     2025250    183200   18.6400  147.5100       9.4        41       807        85
IR     2025250    183200   18.5600  147.4400      10.1        37       823        91
IR     2025250    183200   18.6400  147.3300       9.6        41       760        93
IR     2025250    183200   18.5500  147.1700      12.3        36       716        89
IR     2025250    183200   18.5500  147.0700      14.0        36       712        83
IR     2025250    183200   18.6100  146.8400      14.9        58       426        83
IR     2025250    183200   18.6100  146.7400      13.6        60       418        92
IR     2025250    183200   18.6300  146.6000      12.5        57       381        92
IR     2025250    183200   18.5500  146.5600      12.3        56       368        93
IR     2025250    183200   18.5400  146.0500       9.5        47       233        81
IR     2025250    183200   18.5400  145.9900       8.4        68       225        70
IR     2025250    183200   18.6200  145.9000       9.6        97       216        73
IR     2025250    183200   18.5600  145.8100       9.6        87       208        63
IR     2025250    183200   18.5600  145.6600      11.2        93       198        85
IR     2025250    183200   18.5400  145.6400      10.9        88       196        89
IR     2025250    183200   18.5400  145.4600      10.2       136       182        78
IR     2025250    183200   18.6000  145.4300      11.8       142       183        79
IR     2025250    183200   18.6000  145.3500      13.8       152       171        72
IR     2025250    183200   18.6200  145.1700      15.1       126       158        79
IR     2025250    183200   18.6200  145.1100      16.8       111       153        81
IR     2025250    183200   18.5600  145.0500      16.5       104       149        88
IR     2025250    183200   18.5500  144.8800      11.9       125       150        93
IR     2025250    183200   18.5300  144.7600      11.5       162       152        65
IR     2025250    183200   18.5300  144.5800      12.0       183       159        65
IR     2025250    183200   18.5700  144.5300       8.9       186       160        81
IR     2025250    183200   18.6100  144.2600      14.4       138       170        79
IR     2025250    183200   18.5500  144.1400      13.2       150       175        74
IR     2025250    183200   18.5900  144.0200      14.0       169       185        83
IR     2025250    183200   18.5300  143.9800      15.8       174       187        86
IR     2025250    183200   18.6100  143.8700      13.6       176       203        75
IR     2025250    183200   18.5300  143.7300      14.1       179       208        71
IR     2025250    183200   18.5400  143.6300      11.0       185       217        73
IR     2025250    183200   18.5400  143.5700      10.3       193       221        77
IR     2025250    183200   18.6000  143.4600       9.7       195       233        85
IR     2025250    183200   18.5200  143.2200       8.3       190       258        79
IR     2025250    183200   18.5800  142.9800       5.4       178       255        70
IR     2025250    183200   18.5400  142.9500       6.0       166       256        76
IR     2025250    183200   18.5200  147.4600      11.2        35       872        90
IR     2025250    183200   18.4600  147.4100      11.3        35       873        87
IR     2025250    183200   18.4600  147.2800      10.5        33       865        87
IR     2025250    183200   18.4600  147.1600      10.6        45       714        96
IR     2025250    183200   18.5300  147.0700      13.8        36       712        84
IR     2025250    183200   18.5100  146.9700      13.4        49       418        76
IR     2025250    183200   18.4700  146.9400      12.3        48       415        73
IR     2025250    183200   18.5300  146.7700      13.6        59       416        83
IR     2025250    183200   18.5300  146.7300      13.2        60       413        90
IR     2025250    183200   18.5300  146.5700      12.1        61       369        92
IR     2025250    183200   18.5300  146.5600      12.0        58       364        93
IR     2025250    183200   18.5300  146.3800      18.2        27       354        85
IR     2025250    183200   18.4900  146.3000      19.3        20       331        81
IR     2025250    183200   18.5200  146.0100       8.2        62       227        70
IR     2025250    183200   18.5200  145.9900       8.1        67       222        66
IR     2025250    183200   18.4400  145.8100       8.0        73       203        69
IR     2025250    183200   18.4600  145.7100      10.7        76       200        92
IR     2025250    183200   18.4800  145.2200      14.1       146       155        80
IR     2025250    183200   18.4600  145.0500      11.4       114       140        90
IR     2025250    183200   18.4600  145.0300      11.2       116       141        89
IR     2025250    183200   18.4900  144.8700       9.0       144       149        69
IR     2025250    183200   18.4500  144.7500      12.4       171       153        66
IR     2025250    183200   18.4500  144.6600      15.8       168       157        90
IR     2025250    183200   18.4500  144.6400      15.7       171       158        76
IR     2025250    183200   18.4300  144.5400      14.7       191       163        65
IR     2025250    183200   18.4300  144.4400      12.1       192       163        69
IR     2025250    183200   18.4700  144.3100       8.0       156       166        75
IR     2025250    183200   18.4900  144.2100      11.2       145       171        79
IR     2025250    183200   18.4500  144.0700      14.8       168       180        89
IR     2025250    183200   18.5100  143.9800      16.4       174       187        85
IR     2025250    183200   18.5100  143.9600      16.7       176       188        84
IR     2025250    183200   18.4300  143.8600      17.6       180       197        73
IR     2025250    183200   18.5100  143.7100      14.1       181       209        74
IR     2025250    183200   18.4700  143.6100      12.1       189       219        74
IR     2025250    183200   18.4800  143.4900      10.8       202       227        74
IR     2025250    183200   18.4700  143.4700      10.7       200       228        75
IR     2025250    183200   18.5000  143.3000       8.2       194       255        85
IR     2025250    183200   18.4600  143.2800       8.8       185       258        86
IR     2025250    183200   18.4200  143.1800      10.2       175       262        91
IR     2025250    183200   18.4600  143.0700       9.6       178       260        80
IR     2025250    183200   18.5000  142.9500       7.2       163       257        83
IR     2025250    183200   18.4400  147.4100      11.2        37       875        86
IR     2025250    183200   18.4200  147.2700       9.9        41       862        81
IR     2025250    183200   18.4400  147.1600      10.2        49       712        98
IR     2025250    183200   18.4200  147.1200      11.4        47       705        96
IR     2025250    183200   18.3900  146.9600      12.5        37       412        73
IR     2025250    183200   18.4300  146.9400      11.9        41       413        70
IR     2025250    183200   18.3900  146.8400      12.1        46       408        73
IR     2025250    183200   18.4300  146.7100      11.1        60       402        82
IR     2025250    183200   18.4300  146.5900      11.2        64       364        84
IR     2025250    183200   18.3700  146.4700      12.5        43       347        97
IR     2025250    183200   18.3400  145.8000       8.3        62       199        80
IR     2025250    183200   18.3400  145.6200      12.0        78       184        95
IR     2025250    183200   18.4200  145.6100      13.4        70       188        87
IR     2025250    183200   18.4200  145.5100      12.7        81       176        71
IR     2025250    183200   18.4200  145.3800      11.4        90       169        76
IR     2025250    183200   18.3400  145.3100      11.2        99       155        76
IR     2025250    183200   18.4000  145.1800      14.4        94       144        65
IR     2025250    183200   18.4200  145.1200      14.7       101       140        77
IR     2025250    183200   18.3400  144.9800      11.6       117       141        84
IR     2025250    183200   18.3400  144.8600       8.9       150       149        68
IR     2025250    183200   18.3800  144.7500      11.7       174       155        83
IR     2025250    183200   18.3900  144.6700      14.2       179       158        91
IR     2025250    183200   18.3700  144.5600      15.1       194       166        78
IR     2025250    183200   18.3500  144.4800      14.6       193       167        80
IR     2025250    183200   18.3300  144.4400      14.4       191       167        80
IR     2025250    183200   18.3500  144.2800      12.2       169       167        89
IR     2025250    183200   18.4100  144.1700      11.7       157       173        92
IR     2025250    183200   18.3500  144.1300      13.2       166       176        99
IR     2025250    183200   18.3300  144.0300      14.7       173       184        94
IR     2025250    183200   18.3900  143.9200      18.6       178       189        79
IR     2025250    183200   18.3300  143.8400      16.2       181       195        85
IR     2025250    183200   18.4100  143.7200      15.4       181       208        75
IR     2025250    183200   18.3300  143.5800      14.1       177       225        79
IR     2025250    183200   18.3900  143.4900      11.3       190       231        71
IR     2025250    183200   18.3700  143.4300      11.2       183       242        77
IR     2025250    183200   18.3800  143.2000      11.0       170       263        92
IR     2025250    183200   18.3200  143.0200      12.3       163       263        91
IR     2025250    183200   18.3600  143.0100      11.5       163       260        86
IR     2025250    183200   18.3200  142.8500       8.0       158       253        91
IR     2025250    183200   18.3200  142.7900       6.4       162       255        88
IR     2025250    183200   18.2600  147.4400      11.0        42       873        81
IR     2025250    183200   18.2600  147.3400       9.5        46       844        71
IR     2025250    183200   18.3400  147.2900       9.4        49       848        75
IR     2025250    183200   18.2600  147.1600      11.9        37       417        92
IR     2025250    183200   18.2600  147.0900      13.1        34       411        90
IR     2025250    183200   18.3400  146.9500      13.9        30       409        71
IR     2025250    183200   18.3400  146.9300      13.3        31       407        63
IR     2025250    183200   18.3300  146.7800      10.8        47       404        91
IR     2025250    183200   18.2700  146.6600       8.8        52       393        90
IR     2025250    183200   18.3100  146.6200       9.8        54       370        92
IR     2025250    183200   18.2500  146.5400       9.9        50       334        88
IR     2025250    183200   18.2700  146.2600      10.3        37       309        99
IR     2025250    183200   18.3300  145.8200       8.5        58       199        75
IR     2025250    183200   18.3300  145.8000       8.7        60       198        85
IR     2025250    183200   18.2600  145.6600      11.6        73       184        92
IR     2025250    183200   18.3000  145.6000      12.6        77       177        92
IR     2025250    183200   18.3000  145.4300      10.7        89       168        71
IR     2025250    183200   18.3000  145.3300      10.9        92       155        76
IR     2025250    183200   18.3200  145.3100      11.2        95       154        74
IR     2025250    183200   18.2400  145.1300      13.1       106       139        97
IR     2025250    183200   18.2400  145.1100      13.0       109       140        91
IR     2025250    183200   18.2400  144.7400      13.0       159       160        86
IR     2025250    183200   18.2400  144.7200      13.3       162       162        88
IR     2025250    183200   18.2800  144.6300      13.7       179       168        80
IR     2025250    183200   18.2700  144.4500      14.8       187       173        81
IR     2025250    183200   18.2500  144.3900      14.2       184       170        80
IR     2025250    183200   18.2500  144.3400      14.5       177       169        76
IR     2025250    183200   18.2500  144.2400      13.3       168       169        96
IR     2025250    183200   18.2700  144.1200      12.9       166       176        99
IR     2025250    183200   18.2700  144.0100      13.3       173       186        95
IR     2025250    183200   18.2300  143.9100      13.3       180       189        94
IR     2025250    183200   18.2700  143.8100      13.5       184       196        87
IR     2025250    183200   18.2500  143.7200      14.0       181       212        85
IR     2025250    183200   18.3100  143.5800      14.9       176       226        82
IR     2025250    183200   18.2300  143.5200      16.5       171       238        85
IR     2025250    183200   18.2700  143.4500      15.4       172       248        81
IR     2025250    183200   18.3100  143.3700      12.2       170       256        80
IR     2025250    183200   18.2500  143.2500      11.4       162       264        90
IR     2025250    183200   18.2900  143.1000      11.7       164       268        96
IR     2025250    183200   18.2700  143.0200      11.7       165       268        91
IR     2025250    183200   18.2600  142.9200      10.0       162       261        95
IR     2025250    183200   18.2800  142.8300       7.5       160       255        91
IR     2025250    183200   18.2400  142.7300       5.9       164       262        85
IR     2025250    183200   18.3000  142.6400       6.3       178       273        77
IR     2025250    183200   18.2000  147.4400      10.6        37       860        84
IR     2025250    183200   18.1600  147.3700       9.6        40       840        71
IR     2025250    183200   18.2000  147.2600      10.0        43       798        89
IR     2025250    183200   18.1600  146.9600      16.8        21       399        85
IR     2025250    183200   18.1600  146.9000      16.3        23       395        82
IR     2025250    183200   18.2000  146.8500      14.7        27       399        77
IR     2025250    183200   18.1600  146.6900       9.9        50       394        78
IR     2025250    183200   18.1700  146.5900      10.1        49       347        87
IR     2025250    183200   18.2100  146.5100      10.7        43       324        88
IR     2025250    183200   18.2300  146.3800      13.4        35       331        91
IR     2025250    183200   18.2300  146.2800      10.7        38       316        89
IR     2025250    183200   18.2100  146.2600       9.4        43       306        86
IR     2025250    183200   18.2300  146.1200       7.0        58       240        81
IR     2025250    183200   18.2300  146.0700       6.3        69       220        61
IR     2025250    183200   18.1500  145.9600      10.5        39       211        68
IR     2025250    183200   18.1500  145.8500      11.5        42       204        91
IR     2025250    183200   18.1500  145.6900      12.0        60       191        84
IR     2025250    183200   18.1500  145.6700      11.7        64       186        84
IR     2025250    183200   18.2200  145.5400      11.7        78       172        73
IR     2025250    183200   18.1400  145.4400       8.4        86       168        71
IR     2025250    183200   18.2200  145.3100      10.9        80       153        70
IR     2025250    183200   18.1400  145.2000      11.3       114       153        75
IR     2025250    183200   18.1400  145.1800      11.6       115       154        75
IR     2025250    183200   18.1800  145.0300      11.6       119       154        65
IR     2025250    183200   18.1600  144.9100      10.6       129       163        67
IR     2025250    183200   18.1400  144.8900      10.3       136       169        75
IR     2025250    183200   18.1400  144.7200      13.9       157       173        92
IR     2025250    183200   18.1400  144.7000      14.4       159       173        93
IR     2025250    183200   18.1400  144.5800      13.8       174       179        87
IR     2025250    183200   18.1600  144.4700      14.8       180       180        87
IR     2025250    183200   18.1600  144.3500      14.7       178       175        80
IR     2025250    183200   18.2100  144.2600      14.4       168       169        88
IR     2025250    183200   18.1400  144.1400      12.0       160       178        91
IR     2025250    183200   18.1900  144.0600      12.3       163       183        91
IR     2025250    183200   18.2100  144.0200      12.0       169       186        91
IR     2025250    183200   18.1300  143.8700      12.2       185       194        90
IR     2025250    183200   18.1300  143.7500      11.2       191       209        83
IR     2025250    183200   18.1500  143.6700      13.0       180       220        86
IR     2025250    183200   18.1500  143.6300      13.7       176       225        87
IR     2025250    183200   18.1300  143.5200      15.0       169       241        88
IR     2025250    183200   18.2100  143.4400      16.1       169       255        83
IR     2025250    183200   18.2100  143.3100      12.2       167       263        85
IR     2025250    183200   18.1300  143.2300       9.2       175       267        89
IR     2025250    183200   18.2100  143.0800      10.7       169       271        93
IR     2025250    183200   18.1500  143.0000       9.9       176       274        84
IR     2025250    183200   18.1300  142.9000       8.8       174       268        91
IR     2025250    183200   18.1300  142.8600       8.0       172       266        90
IR     2025250    183200   18.1300  142.7100       5.1       156       260        81
IR     2025250    183200   18.1600  142.6300       5.4       169       277        87
IR     2025250    183200   18.1400  147.4500      10.7        31       858        83
IR     2025250    183200   18.1000  147.3700       9.0        40       833        71
IR     2025250    183200   18.1000  147.2300       9.7        43       782        86
IR     2025250    183200   18.0600  147.2100      12.8        31       408        85
IR     2025250    183200   18.0600  147.0900      12.4        32       405        88
IR     2025250    183200   18.0600  146.9500      16.0        18       398        85
IR     2025250    183200   18.1400  146.9000      16.6        23       395        84
IR     2025250    183200   18.0600  146.8200      15.9        22       390        83
IR     2025250    183200   18.0600  146.6400      10.2        50       377        87
IR     2025250    183200   18.0600  146.5600       9.7        50       317        87
IR     2025250    183200   18.1100  146.3500      12.6        38       305        83
IR     2025250    183200   18.0500  146.1700       9.9        37       266        88
IR     2025250    183200   18.1100  146.1600       9.1        45       264        81
IR     2025250    183200   18.0900  146.0600       8.6        44       221        73
IR     2025250    183200   18.1100  145.9400      11.5        37       212        75
IR     2025250    183200   18.0900  145.8200      12.4        42       205        94
IR     2025250    183200   18.1300  145.6900      12.6        57       191        85
IR     2025250    183200   18.1300  145.6700      12.2        60       187        86
IR     2025250    183200   18.0500  145.5700      12.1        52       181        87
IR     2025250    183200   18.0500  145.4100       9.7        54       172        87
IR     2025250    183200   18.1000  145.3600       7.9        76       161        82
IR     2025250    183200   18.1200  145.2000      11.0       113       155        77
IR     2025250    183200   18.0400  145.1200      10.0       123       169        82
IR     2025250    183200   18.0400  145.0000       8.5       138       183        82
IR     2025250    183200   18.0400  144.9800       8.1       142       186        82
IR     2025250    183200   18.0400  144.8900       9.1       161       194        84
IR     2025250    183200   18.0600  144.7700      12.0       168       185        84
IR     2025250    183200   18.0800  144.6800      14.7       165       183        89
IR     2025250    183200   18.0600  144.6000      14.0       176       184        73
IR     2025250    183200   18.0600  144.5000      13.9       181       183        88
IR     2025250    183200   18.1200  144.3300      14.5       177       178        80
IR     2025250    183200   18.0400  144.3100      13.9       175       182        89
IR     2025250    183200   18.0600  144.2100      13.6       170       179        77
IR     2025250    183200   18.1200  144.1200      12.3       160       182        92
IR     2025250    183200   18.0700  143.9600      12.1       176       189        93
IR     2025250    183200   18.1100  143.8600      12.2       186       195        89
IR     2025250    183200   18.1100  143.7500      11.0       192       209        83
IR     2025250    183200   18.0500  143.7100      10.0       192       217        83
IR     2025250    183200   18.0700  143.5500      12.5       171       235        83
IR     2025250    183200   18.1100  143.5200      14.4       169       241        88
IR     2025250    183200   18.0700  143.3600      11.3       175       267        87
IR     2025250    183200   18.0500  143.3200      10.3       180       270        87
IR     2025250    183200   18.0700  143.1700       8.2       190       270        87
IR     2025250    183200   18.0900  143.0900       8.4       183       273        87
IR     2025250    183200   18.1100  142.9800       9.2       180       275        85
IR     2025250    183200   18.0900  142.8800       8.3       175       270        90
IR     2025250    183200   18.1100  142.8600       7.9       173       267        90
IR     2025250    183200   18.0700  142.7000       4.2       148       260        83
IR     2025250    183200   17.9700  147.5000      11.3        31       915        83
IR     2025250    183200   18.0400  147.3300       8.8        42       824        68
IR     2025250    183200   18.0000  147.2200      10.3        37       789        87
IR     2025250    183200   18.0400  147.1900      13.1        30       407        87
IR     2025250    183200   18.0200  147.0700      12.5        30       404        89
IR     2025250    183200   18.0400  146.9500      15.6        18       399        86
IR     2025250    183200   18.0000  146.8300      16.3        17       389        85
IR     2025250    183200   17.9600  146.8100      16.1        17       387        83
IR     2025250    183200   17.9600  146.6900      14.1        22       385        97
IR     2025250    183200   17.9600  146.5400      10.7        37       310        91
IR     2025250    183200   17.9800  146.5200      10.8        38       293        90
IR     2025250    183200   17.9800  146.3400      11.2        40       286        90
IR     2025250    183200   18.0000  146.3100      11.1        39       287        91
IR     2025250    183200   18.0300  146.1700      10.2        35       266        89
IR     2025250    183200   17.9700  146.1100      11.9        32       248        93
IR     2025250    183200   17.9500  145.9900      13.9        30       227        93
IR     2025250    183200   17.9500  145.8900      13.8        35       219        93
IR     2025250    183200   17.9500  145.8000      13.8        41       212        97
IR     2025250    183200   17.9700  145.7200      14.1        43       205        88
IR     2025250    183200   18.0300  145.5900      12.8        51       184        87
IR     2025250    183200   17.9700  145.5400      11.7        44       185        92
IR     2025250    183200   18.0100  145.4100       9.5        50       177        96
IR     2025250    183200   17.9700  145.1700       6.3       116       173        68
IR     2025250    183200   17.9500  145.1200       6.4       129       185        73
IR     2025250    183200   18.0200  145.0000       8.3       140       194        82
IR     2025250    183200   18.0200  144.8900       9.2       163       198        84
IR     2025250    183200   18.0200  144.8700       9.8       162       197        83
IR     2025250    183200   18.0000  144.7100      13.8       174       190        77
IR     2025250    183200   18.0200  144.6500      14.6       172       187        73
IR     2025250    183200   17.9600  144.5700      13.7       188       188        68
IR     2025250    183200   18.0000  144.4000      13.1       186       184        86
IR     2025250    183200   17.9400  144.3000      13.4       177       184        82
IR     2025250    183200   18.0200  144.2900      14.1       174       182        87
IR     2025250    183200   17.9800  144.1500      12.1       172       184        84
IR     2025250    183200   18.0000  144.0100      12.1       174       187        95
IR     2025250    183200   17.9600  143.9200      11.7       183       198        87
IR     2025250    183200   17.9400  143.8900      11.5       185       201        86
IR     2025250    183200   17.9800  143.7200       9.5       194       216        76
IR     2025250    183200   18.0100  143.6900       9.1       191       222        78
IR     2025250    183200   17.9300  143.5300       8.1       175       245        72
IR     2025250    183200   17.9500  143.5100       8.6       171       248        76
IR     2025250    183200   18.0100  143.3800      10.7       177       268        84
IR     2025250    183200   18.0100  143.3000       9.8       185       272        81
IR     2025250    183200   17.9300  143.2200       8.3       199       274        69
IR     2025250    183200   18.0100  143.1100       8.4       193       271        84
IR     2025250    183200   17.9300  142.9500       7.8       179       274        81
IR     2025250    183200   17.9900  142.7000       4.2       154       258        81
IR     2025250    183200   17.9100  147.4100       9.5        37       864        84
IR     2025250    183200   17.8700  147.3300       8.9        40       820        82
IR     2025250    183200   17.9300  147.2800       8.5        43       802        80
IR     2025250    183200   17.9200  147.1600      10.8        31       786        87
IR     2025250    183200   17.8600  147.0800      13.8        27       408        80
IR     2025250    183200   17.8600  147.0000      14.1        27       405        86
IR     2025250    183200   17.9400  146.8300      15.8        17       389        84
IR     2025250    183200   17.9400  146.7900      15.8        18       388        83
IR     2025250    183200   17.9200  146.6300      12.6        26       380        98
IR     2025250    183200   17.9400  146.3800      11.1        41       285        90
IR     2025250    183200   17.9100  146.0900      13.4        30       252        96
IR     2025250    183200   17.9100  146.0700      13.8        30       248        97
IR     2025250    183200   17.8900  145.9100      14.3        35       227        97
IR     2025250    183200   17.8500  145.8700      14.7        38       230        97
IR     2025250    183200   17.9100  145.7200      13.5        42       206        90
IR     2025250    183200   17.9300  145.6000      12.1        44       197        90
IR     2025250    183200   17.8700  145.5800      10.9        42       199        89
IR     2025250    183200   17.9100  145.4200       7.8        40       182        99
IR     2025250    183200   17.9300  145.1300       5.5       126       188        69
IR     2025250    183200   17.9100  145.0900       5.6       137       199        78
IR     2025250    183200   17.9200  144.7300      13.3       180       190        68
IR     2025250    183200   17.9200  144.7100      14.0       180       189        68
IR     2025250    183200   17.8800  144.6100      13.6       191       191        70
IR     2025250    183200   17.8600  144.4300      13.9       194       192        82
IR     2025250    183200   17.8600  144.4100      13.6       194       191        82
IR     2025250    183200   17.9000  144.3200      13.6       181       185        83
IR     2025250    183200   17.8400  144.2000      12.2       185       186        81
IR     2025250    183200   17.8400  144.1000      10.4       177       187        92
IR     2025250    183200   17.8400  143.9500      11.3       181       199        83
IR     2025250    183200   17.8400  143.9300      11.4       181       204        83
IR     2025250    183200   17.8400  143.8300      11.7       189       210        88
IR     2025250    183200   17.9000  143.7000       9.2       193       222        80
IR     2025250    183200   17.8400  143.6200       7.6       187       234        74
IR     2025250    183200   17.8800  143.5100       8.0       180       253        82
IR     2025250    183200   17.8800  143.4500       8.6       183       261        85
IR     2025250    183200   17.9100  143.2800       8.6       191       275        79
IR     2025250    183200   17.8900  143.2600       8.5       194       274        77
IR     2025250    183200   17.8900  143.0800       8.1       188       272        76
IR     2025250    183200   17.8300  142.9800       7.8       180       270        78
IR     2025250    183200   17.8300  142.9600       7.8       177       271        80
IR     2025250    183200   17.9100  142.8300       7.4       175       273        72
IR     2025250    183200   17.9100  142.7700       6.5       170       266        77
IR     2025250    183200   17.7700  147.4000      10.2        29       918        80
IR     2025250    183200   17.8300  147.3700       9.7        34       830        90
IR     2025250    183200   17.8100  147.2900       9.0        38       794        96
IR     2025250    183200   17.8500  147.1700      10.8        31       774        95
IR     2025250    183200   17.7700  147.0700      14.0        28       415        75
IR     2025250    183200   17.7700  146.9500      14.4        28       409        86
IR     2025250    183200   17.7800  146.8200      15.9        18       399        84
IR     2025250    183200   17.8400  146.7200      16.6        14       392        94
IR     2025250    183200   17.7800  146.7000      16.8        14       399        94
IR     2025250    183200   17.8000  146.6100      13.9        27       393        98
IR     2025250    183200   17.7800  146.1000      13.3        37       260        93
IR     2025250    183200   17.8300  145.8300      14.5        38       226        99
IR     2025250    183200   17.7900  145.7700      13.5        39       219        96
IR     2025250    183200   17.8100  144.6800      11.4       192       184        73
IR     2025250    183200   17.7800  144.5800      10.2       201       193        80
IR     2025250    183200   17.7800  144.5600      10.2       203       195        80
IR     2025250    183200   17.7600  144.3900      10.0       194       192        78
IR     2025250    183200   17.7400  144.3500       9.8       186       191        81
IR     2025250    183200   17.7400  144.2300      11.5       181       188        88
IR     2025250    183200   17.7400  144.1400      10.2       178       189        95
IR     2025250    183200   17.7600  144.0000      10.6       185       198        81
IR     2025250    183200   17.8000  143.9500      11.4       180       204        83
IR     2025250    183200   17.7800  143.8700      11.5       183       210        89
IR     2025250    183200   17.7400  143.7700      10.8       187       218        90
IR     2025250    183200   17.7800  143.6900       9.3       190       224        82
IR     2025250    183200   17.7400  143.5600       8.5       186       250        82
IR     2025250    183200   17.8000  143.4300       9.5       191       262        83
IR     2025250    183200   17.7400  143.3800       9.5       196       265        87
IR     2025250    183200   17.8000  143.2900       8.9       192       272        81
IR     2025250    183200   17.8000  143.1700       7.8       190       272        74
IR     2025250    183200   17.8100  143.0400       7.8       180       270        79
IR     2025250    183200   17.8100  142.9800       7.8       179       268        80
IR     2025250    183200   17.7900  142.8500       8.1       174       271        66
IR     2025250    183200   17.7300  142.7500       7.7       178       273        89
IR     2025250    183200   17.7300  142.6500       6.8       173       265        90
IR     2025250    183200   17.7500  142.6000       5.7       168       264        89
IR     2025250    183200   17.7500  147.4000       9.9        30       918        75
IR     2025250    183200   17.7100  147.3800       9.1        34       900        72
IR     2025250    183200   17.7100  147.2800       7.6        39       795        92
IR     2025250    183200   17.6700  147.1400       9.8        38       743        94
IR     2025250    183200   17.7300  147.0300      13.8        33       420        72
IR     2025250    183200   17.6900  146.9900      13.8        37       422        79
IR     2025250    183200   17.6700  146.6900      15.1        27       406        87
IR     2025250    183200   17.6800  146.3600      10.0        36       289        81
IR     2025250    183200   17.7400  146.2900      11.0        35       275        84
IR     2025250    183200   17.7200  146.1700      12.6        37       267        89
IR     2025250    183200   17.7000  146.1100      12.8        37       259        89
IR     2025250    183200   17.6600  145.6600       9.7        33       217        84
IR     2025250    183200   17.6600  145.5600       7.7        28       208        84
IR     2025250    183200   17.7300  144.9300       5.3       204       185        60
IR     2025250    183200   17.7300  144.8100       6.5       198       185        60
IR     2025250    183200   17.6500  144.7100       6.1       204       191        78
IR     2025250    183200   17.6700  144.5600       5.9       221       208        72
IR     2025250    183200   17.6900  144.5400       6.5       217       206        73
IR     2025250    183200   17.6500  144.4200       5.4       213       198        79
IR     2025250    183200   17.6500  144.2700       8.9       180       193        80
IR     2025250    183200   17.6700  144.2500       9.9       179       192        86
IR     2025250    183200   17.6600  144.1300      10.1       182       199        92
IR     2025250    183200   17.6600  143.9800      12.1       185       208        87
IR     2025250    183200   17.7000  143.8800      11.9       179       211        91
IR     2025250    183200   17.6600  143.8400      11.8       182       214        92
IR     2025250    183200   17.7200  143.7700      10.7       186       219        89
IR     2025250    183200   17.6600  143.5900       6.8       186       243        86
IR     2025250    183200   17.6600  143.5700       7.1       185       248        83
IR     2025250    183200   17.6600  143.4400       8.4       194       259        82
IR     2025250    183200   17.6400  143.3200       9.3       196       268        86
IR     2025250    183200   17.6400  143.2800       8.8       196       270        87
IR     2025250    183200   17.6400  143.1100       8.0       182       268        89
IR     2025250    183200   17.6600  143.0200       7.3       183       261        86
IR     2025250    183200   17.7200  142.9600       7.4       181       260        84
IR     2025250    183200   17.7100  142.6500       6.8       173       266        90
IR     2025250    183200   17.6400  142.6100       6.3       168       282        84
IR     2025250    183200   17.5700  147.4100      10.5        32       868        87
IR     2025250    183200   17.6500  147.3200       8.7        34       846        78
IR     2025250    183200   17.5700  147.2100       8.6        36       769        89
IR     2025250    183200   17.6500  146.9900      13.7        38       424        80
IR     2025250    183200   17.5900  146.6300      13.0        34       406        86
IR     2025250    183200   17.5700  146.6100      12.3        34       403        84
IR     2025250    183200   17.6200  146.1500      12.0        37       262        87
IR     2025250    183200   17.5600  146.0300      13.0        39       257        86
IR     2025250    183200   17.5800  145.9300      13.2        39       257        89
IR     2025250    183200   17.6400  145.6400       9.2        32       217        85
IR     2025250    183200   17.6200  145.5400       6.8        24       211        86
IR     2025250    183200   17.5600  145.2700       4.1       307       186        65
IR     2025250    183200   17.6300  145.0800       5.0       257       183        84
IR     2025250    183200   17.6300  145.0400       5.0       250       183        81
IR     2025250    183200   17.5500  144.8800       4.2       240       193        74
IR     2025250    183200   17.5900  144.8400       4.2       226       189        66
IR     2025250    183200   17.6300  144.5800       4.8       225       210        70
IR     2025250    183200   17.6300  144.4400       4.5       222       199        82
IR     2025250    183200   17.5500  144.2400       6.9       185       203        78
IR     2025250    183200   17.5500  144.1500      10.6       190       211        84
IR     2025250    183200   17.6200  144.0900      10.6       186       208        92
IR     2025250    183200   17.5700  143.9400      12.4       180       211        94
IR     2025250    183200   17.6000  143.8600      11.7       178       214        94
IR     2025250    183200   17.5400  143.8000       9.8       179       227        84
IR     2025250    183200   17.5400  143.6300       4.9       180       249        86
IR     2025250    183200   17.5600  143.6100       5.3       182       249        85
IR     2025250    183200   17.5800  143.4500       7.5       192       261        73
IR     2025250    183200   17.5800  143.3400       9.2       197       269        85
IR     2025250    183200   17.5600  143.2600       9.1       197       271        87
IR     2025250    183200   17.5400  143.2200       9.2       194       271        87
IR     2025250    183200   17.6200  143.1100       8.0       184       269        88
IR     2025250    183200   17.5400  142.8600       6.1       192       270        79
IR     2025250    183200   17.5800  142.7400       6.4       184       291        84
IR     2025250    183200   17.6200  142.5900       6.1       167       282        86
IR     2025250    183200   17.4800  147.8100       9.8        30       953        94
IR     2025250    183200   17.5200  147.7000      10.8        25       950        93
IR     2025250    183200   17.5200  147.5600      12.2        28       899        97
IR     2025250    183200   17.4800  147.5000      10.6        27       874        98
IR     2025250    183200   17.5500  147.3900      10.0        34       868        85
IR     2025250    183200   17.4900  147.2900       8.4        32       846        69
IR     2025250    183200   17.5500  147.1900       8.8        35       769        89
IR     2025250    183200   17.4700  147.0900      10.5        40       420        76
IR     2025250    183200   17.5500  147.0200      11.9        41       425        78
IR     2025250    183200   17.5300  146.9200      11.5        38       418        78
IR     2025250    183200   17.4900  146.8400      11.1        37       414        75
IR     2025250    183200   17.5300  146.6700      11.9        33       403        89
IR     2025250    183200   17.5500  146.5900      11.8        33       397        82
IR     2025250    183200   17.4700  146.4700      10.2        30       378        79
IR     2025250    183200   17.5000  146.0600      11.5        33       262        88
IR     2025250    183200   17.5000  145.9600      12.5        35       257        86
IR     2025250    183200   17.5200  145.8700      12.0        35       257        89
IR     2025250    183200   17.5400  145.7300      10.4        33       242        83
IR     2025250    183200   17.5400  145.7100      10.0        32       239        83
IR     2025250    183200   17.4800  145.6100       8.1        37       231        84
IR     2025250    183200   17.4600  145.5000       5.3        15       223        75
IR     2025250    183200   17.5400  145.2300       4.0       301       191        66
IR     2025250    183200   17.4700  144.3000       4.8       191       206        73
IR     2025250    183200   17.4500  144.1600      11.8       194       217        84
IR     2025250    183200   17.4900  144.1100      12.5       191       215        91
IR     2025250    183200   17.4500  143.9500      13.3       182       217        96
IR     2025250    183200   17.4500  143.9300      13.1       181       218        96
IR     2025250    183200   17.5300  143.8000       9.7       179       230        83
IR     2025250    183200   17.4500  143.6600       6.3       180       258        74
IR     2025250    183200   17.4500  143.6400       5.4       177       261        72
IR     2025250    183200   17.5200  143.3400       8.9       195       270        83
IR     2025250    183200   17.5200  143.2200       9.5       193       270        87
IR     2025250    183200   17.4600  143.1600       9.9       192       269        86
IR     2025250    183200   17.4400  143.0500       8.7       193       272        87
IR     2025250    183200   17.4600  142.7800       6.1       183       293        81
IR     2025250    183200   17.5000  142.6400       5.4       164       295        79
IR     2025250    183200   17.4400  147.7900       9.5        31       942        92
IR     2025250    183200   17.3800  147.5300       7.4        27       870        93
IR     2025250    183200   17.4400  147.3600       8.6        32       864        86
IR     2025250    183200   17.4600  147.2700       8.0        32       849        70
IR     2025250    183200   17.4500  147.2300       8.0        33       833        72
IR     2025250    183200   17.3900  147.0900       7.1        34       751        71
IR     2025250    183200   17.3700  147.0500       6.9        35       725        71
IR     2025250    183200   17.4300  146.8700      10.6        39       414        78
IR     2025250    183200   17.4500  146.8400      11.0        38       412        76
IR     2025250    183200   17.4100  146.7600      10.5        41       407        80
IR     2025250    183200   17.4300  146.5800      10.3        38       396        81
IR     2025250    183200   17.4300  146.4800       9.7        30       383        73
IR     2025250    183200   17.3900  146.0900       7.8        20       267        81
IR     2025250    183200   17.4400  145.9600      11.1        29       258        81
IR     2025250    183200   17.3600  145.8400       8.0        10       252        71
IR     2025250    183200   17.3600  145.8200       7.9        12       250        70
IR     2025250    183200   17.4200  145.6700       9.1        35       238        81
IR     2025250    183200   17.4000  145.5500       7.2        36       230        81
IR     2025250    183200   17.4000  145.5300       6.6        31       230        79
IR     2025250    183200   17.3800  145.4300       4.7       349       235        73
IR     2025250    183200   17.3800  145.3400       5.9       308       238        63
IR     2025250    183200   17.3800  145.1600       6.3       281       238        62
IR     2025250    183200   17.3600  144.6600       6.2       289       220        67
IR     2025250    183200   17.3500  144.6000       5.7       288       214        80
IR     2025250    183200   17.4300  144.3100       4.2       195       209        68
IR     2025250    183200   17.3700  144.1400      12.5       188       223        92
IR     2025250    183200   17.4300  143.9500      13.5       181       219        97
IR     2025250    183200   17.4300  143.8500      12.5       181       235        92
IR     2025250    183200   17.3700  143.6800       8.8       187       270        79
IR     2025250    183200   17.4300  143.6600       6.8       181       263        74
IR     2025250    183200   17.3700  143.3100      10.1       188       274        81
IR     2025250    183200   17.4200  143.2900       9.9       191       270        80
IR     2025250    183200   17.4000  142.7700       6.4       180       294        64
IR     2025250    183200   17.4000  142.7400       6.3       177       292        61
IR     2025250    183200   17.3400  147.7300       8.5        31       909        87
IR     2025250    183200   17.3200  147.5300       6.6        30       859        93
IR     2025250    183200   17.3600  147.3600       6.2        38       854        85
IR     2025250    183200   17.3600  147.3400       6.2        39       851        79
IR     2025250    183200   17.3600  147.1600       7.1        35       800        76
IR     2025250    183200   17.3600  147.0600       6.6        34       737        68
IR     2025250    183200   17.3200  147.0200       6.1        36       721        72
IR     2025250    183200   17.2800  146.9400       5.9        47       410        64
IR     2025250    183200   17.2900  146.7700       9.1        44       408        73
IR     2025250    183200   17.3100  146.7300      10.0        45       407        82
IR     2025250    183200   17.3300  146.5800       9.8        40       403        79
IR     2025250    183200   17.3500  146.3800       7.6        16       358        78
IR     2025250    183200   17.2700  146.0100       5.2       354       254        78
IR     2025250    183200   17.3300  145.8900       7.0       359       254        76
IR     2025250    183200   17.3400  145.8000       7.3         9       248        74
IR     2025250    183200   17.3400  145.6800       7.1        26       240        75
IR     2025250    183200   17.3200  145.6200       6.3        29       235        79
IR     2025250    183200   17.2800  145.5100       4.6         3       234        73
IR     2025250    183200   17.2800  145.4300       4.8       328       236        67
IR     2025250    183200   17.2800  144.9600       6.3       273       235        65
IR     2025250    183200   17.2600  144.7700       7.5       286       229        85
IR     2025250    183200   17.3000  144.6700       7.0       291       222        77
IR     2025250    183200   17.3200  144.6400       6.6       291       220        80
IR     2025250    183200   17.3300  143.8900      13.7       183       246        95
IR     2025250    183200   17.2500  143.4600       9.2       187       285        89
IR     2025250    183200   17.3300  143.3100      10.3       188       272        85
IR     2025250    183200   17.3300  143.2100      10.5       182       268        80
IR     2025250    183200   17.3200  142.9100       7.5       188       287        64
IR     2025250    183200   17.2100  147.8000       8.8        37       905        90
IR     2025250    183200   17.2600  147.1200       5.9        42       752        69
IR     2025250    183200   17.2600  146.9600       5.5        49       409        60
IR     2025250    183200   17.2400  146.9200       5.8        47       409        64
IR     2025250    183200   17.1800  146.8400       6.3        46       408        67
IR     2025250    183200   17.2200  146.6700       9.6        46       408        82
IR     2025250    183200   17.2500  146.6500      10.0        45       407        87
IR     2025250    183200   17.2300  146.5500       8.5        41       409        65
IR     2025250    183200   17.1700  146.2700       5.6         5       342        76
IR     2025250    183200   17.1700  146.2400       5.3         1       311        83
IR     2025250    183200   17.2300  146.1600       4.7       357       255        79
IR     2025250    183200   17.2100  146.0400       4.5       339       252        69
IR     2025250    183200   17.1700  145.9100       6.2       320       249        81
IR     2025250    183200   17.1700  145.8100       6.8       313       244        82
IR     2025250    183200   17.1700  145.7700       6.8       313       243        84
IR     2025250    183200   17.1700  145.6300       6.1       320       237        77
IR     2025250    183200   17.1700  145.5600       6.1       323       234        73
IR     2025250    183200   17.1700  145.4600       6.4       315       237        74
IR     2025250    183200   17.2400  145.3100       7.7       293       238        83
IR     2025250    183200   17.2400  145.2900       8.2       290       238        84
IR     2025250    183200   17.2200  145.1500       9.2       281       236        88
IR     2025250    183200   17.2400  145.0600       7.3       273       235        84
IR     2025250    183200   17.2400  144.9200       7.0       273       236        79
IR     2025250    183200   17.2400  144.9000       6.9       273       236        80
IR     2025250    183200   17.2400  144.7700       7.6       285       229        87
IR     2025250    183200   17.2000  144.6300       6.0       294       235        84
IR     2025250    183200   17.2200  144.6100       6.1       294       229        84
IR     2025250    183200   17.1600  143.9700      13.6       187       256        98
IR     2025250    183200   17.2300  143.8200      14.0       189       273        97
IR     2025250    183200   17.1500  143.5700      11.3       187       295        85
IR     2025250    183200   17.2300  143.4600       9.5       187       284        89
IR     2025250    183200   17.1700  143.3400      10.0       182       261        91
IR     2025250    183200   17.1900  143.2800       9.9       180       261        91
IR     2025250    183200   17.2300  143.1700       9.0       178       258        77
IR     2025250    183200   17.1500  142.7800       6.0       166       260        87
IR     2025250    183200   17.2100  142.7100       5.5       161       260        80
IR     2025250    183200   17.1500  142.6500       5.1       150       275        88
IR     2025250    183200   17.0900  147.5700       7.5        33       863        87
IR     2025250    183200   17.0900  147.5100       6.7        31       849        62
IR     2025250    183200   17.1000  147.1400       4.2        55       620        89
IR     2025250    183200   17.0800  147.1200       4.6        55       613        87
IR     2025250    183200   17.1600  146.9500       4.1        54       411        64
IR     2025250    183200   17.1400  146.7800       6.7        48       407        71
IR     2025250    183200   17.1600  146.5800       8.4        46       417        84
IR     2025250    183200   17.0900  145.8000       5.7       313       248        85
IR     2025250    183200   17.0900  145.7800       6.0       312       247        84
IR     2025250    183200   17.0900  145.6900       7.0       310       244        84
IR     2025250    183200   17.1300  145.5200       7.2       312       237        77
IR     2025250    183200   17.1300  145.4200       7.9       305       238        80
IR     2025250    183200   17.1300  145.4000       8.1       303       238        80
IR     2025250    183200   17.0700  145.2400      10.2       286       245        87
IR     2025250    183200   17.0700  145.1800      10.3       284       247        85
IR     2025250    183200   17.0900  145.0700       9.0       277       250        77
IR     2025250    183200   17.1000  145.0100       8.6       269       248        72
IR     2025250    183200   17.0600  144.5300       4.0       273       245        60
IR     2025250    183200   17.0600  144.3400       5.1       198       238        82
IR     2025250    183200   17.1000  144.2000       8.6       182       240        90
IR     2025250    183200   17.1000  143.9700      12.8       190       260        96
IR     2025250    183200   17.0800  143.9100      12.5       195       280        93
IR     2025250    183200   17.1000  143.8000      12.2       192       302        90
IR     2025250    183200   17.0800  143.6400      11.6       182       293        83
IR     2025250    183200   17.0600  143.6200      11.5       182       289        81
IR     2025250    183200   17.1300  143.5300      11.2       186       286        87
IR     2025250    183200   17.0500  143.3900       9.0       172       254        84
IR     2025250    183200   17.1300  142.9200       6.7       182       259        64
IR     2025250    183200   17.1100  142.9000       6.6       181       257        68
IR     2025250    183200   17.0500  142.7600       7.1       169       260        87
IR     2025250    183200   17.0700  142.6500       6.4       157       290        92
IR     2025250    183200   17.0500  147.5700       7.3        35       872        91
IR     2025250    183200   17.0700  147.5100       6.6        32       852        63
IR     2025250    183200   17.0300  147.3100       4.1        38       796        63
IR     2025250    183200   17.0100  147.1800       4.6        55       620        81
IR     2025250    183200   17.0600  147.0800       5.2        54       604        80
IR     2025250    183200   17.0100  145.6600       6.8       310       258        86
IR     2025250    183200   17.0100  145.4300       8.8       299       245        82
IR     2025250    183200   16.9700  145.1600      10.3       283       267        79
IR     2025250    183200   17.0300  145.0900       9.6       279       262        79
IR     2025250    183200   17.0400  144.8200       7.0       271       255        83
IR     2025250    183200   16.9900  144.6800       5.3       291       251        77
IR     2025250    183200   17.0400  144.5500       4.2       280       245        61
IR     2025250    183200   16.9800  144.2600       6.1       190       236        86
IR     2025250    183200   17.0000  144.2400       6.5       189       236        88
IR     2025250    183200   17.0400  144.0700      10.6       191       245        91
IR     2025250    183200   16.9600  144.0000      10.5       196       259        91
IR     2025250    183200   16.9600  143.9500      10.8       194       290        87
IR     2025250    183200   16.9800  143.7900      11.0       189       311        86
IR     2025250    183200   17.0400  143.7000      12.0       186       302        85
IR     2025250    183200   17.0400  143.6200      11.3       181       288        80
IR     2025250    183200   17.0400  143.5100      10.4       178       265        88
IR     2025250    183200   16.9800  143.4100       9.1       161       249        84
IR     2025250    183200   17.0200  143.3000      10.0       162       252        90
IR     2025250    183200   16.9800  143.2000       9.7       159       250        77
IR     2025250    183200   17.0300  142.9300       6.8       180       257        82
IR     2025250    183200   17.0100  142.9100       7.0       179       258        85
IR     2025250    183200   17.0300  142.7800       7.2       170       259        84
IR     2025250    183200   16.9500  142.6600       7.6       164       277        86
IR     2025250    183200   17.0100  142.6100       6.5       156       310        86
IR     2025250    183200   16.8900  147.3800       7.7        35       906        66
IR     2025250    183200   16.8900  147.1300       6.2        47       687        62
IR     2025250    183200   16.9300  147.0500       5.9        51       598        79
IR     2025250    183200   16.8700  145.4200       7.4       292       269        77
IR     2025250    183200   16.9300  145.3500       9.0       294       261        86
IR     2025250    183200   16.8700  145.0200       6.0       281       275        74
IR     2025250    183200   16.8700  144.9400       5.3       289       273        73
IR     2025250    183200   16.9100  144.8700       5.9       287       265        85
IR     2025250    183200   16.8700  144.7100       5.2       283       257        81
IR     2025250    183200   16.8700  144.6700       4.8       281       256        78
IR     2025250    183200   16.9400  144.3900       4.0       204       237        83
IR     2025250    183200   16.9400  144.2700       5.6       192       236        84
IR     2025250    183200   16.9400  144.0000      10.2       197       265        89
IR     2025250    183200   16.9400  143.9300      10.3       194       302        81
IR     2025250    183200   16.8800  143.6000       9.1       178       272        80
IR     2025250    183200   16.8600  143.5000       8.7       168       250        84
IR     2025250    183200   16.9000  143.4600       9.0       164       249        85
IR     2025250    183200   16.9400  143.2000       9.6       159       252        75
IR     2025250    183200   16.9200  143.1200       8.6       168       256        71
IR     2025250    183200   16.8800  142.9500       6.6       179       248        86
IR     2025250    183200   16.9000  142.8900       6.3       176       249        77
IR     2025250    183200   16.9100  142.7600       7.2       169       256        88
IR     2025250    183200   16.9300  142.6600       7.2       164       276        86
IR     2025250    183200   16.9300  142.6400       7.0       163       284        86
IR     2025250    183200   16.8700  147.3800       7.9        34       919        65
IR     2025250    183200   16.8300  147.0700       5.4        39       715        86
IR     2025250    183200   16.8300  147.0500       5.3        40       678        87
IR     2025250    183200   16.8100  146.9100       5.3        36       588        86
IR     2025250    183200   16.8400  145.5600       5.9       293       317        80
IR     2025250    183200   16.8300  145.1900       7.4       276       293        68
IR     2025250    183200   16.8500  145.0800       6.5       278       280        74
IR     2025250    183200   16.7900  144.7300       4.7       280       267        84
IR     2025250    183200   16.8100  144.7100       4.8       279       263        83
IR     2025250    183200   16.8300  144.4600       4.3       230       250        82
IR     2025250    183200   16.7700  144.4200       4.7       221       259        70
IR     2025250    183200   16.8300  144.0900       5.6       197       284        86
IR     2025250    183200   16.7700  144.0000       7.4       198       311        84
IR     2025250    183200   16.8200  143.8800       8.5       193       313        71
IR     2025250    183200   16.8400  143.8600       8.8       193       313        73
IR     2025250    183200   16.8400  143.7300       8.5       183       296        75
IR     2025250    183200   16.8200  143.6300       8.1       178       273        81
IR     2025250    183200   16.8400  143.5200       8.4       169       251        87
IR     2025250    183200   16.7800  143.0600       7.7       178       250        71
IR     2025250    183200   16.7800  143.0400       7.5       177       246        76
IR     2025250    183200   16.7600  142.8700       6.0       167       246        74
IR     2025250    183200   16.7600  142.8100       5.7       163       249        75
IR     2025250    183200   16.8200  142.7000       5.2       165       259        74
IR     2025250    183200   16.7100  147.1800       6.7        32       866        62
IR     2025250    183200   16.7300  146.8900       5.3        35       659        85
IR     2025250    183200   16.7100  146.8500       5.6        38       652        85
IR     2025250    183200   16.6800  145.8000       5.1       299       393        87
IR     2025250    183200   16.7500  144.7800       4.1       284       278        84
IR     2025250    183200   16.6900  144.4500       5.9       216       278        77
IR     2025250    183200   16.7300  144.4200       5.4       215       267        77
IR     2025250    183200   16.7300  144.3200       5.7       199       273        68
IR     2025250    183200   16.7500  144.2400       5.1       196       273        76
IR     2025250    183200   16.6700  144.0700       5.5       204       315        73
IR     2025250    183200   16.7500  144.0100       7.0       199       312        87
IR     2025250    183200   16.6700  143.7600       6.6       181       281        69
IR     2025250    183200   16.6900  143.6700       6.5       174       250        76
IR     2025250    183200   16.6700  143.5100       8.0       158       243        94
IR     2025250    183200   16.7400  143.0800       7.6       178       249        66
IR     2025250    183200   16.7400  142.8300       5.5       162       247        80
IR     2025250    183200   16.7200  142.7700       5.0       161       252        76
IR     2025250    183200   16.6400  147.1500       5.7        20       891        69
IR     2025250    183200   16.6300  146.7100       4.8        39       664        73
IR     2025250    183200   16.6300  146.6900       4.6        37       643        73
IR     2025250    183200   16.6400  145.8600       4.2       297       407        96
IR     2025250    183200   16.6600  145.8000       5.2       297       397        92
IR     2025250    183200   16.6600  145.7000       4.7       296       395        72
IR     2025250    183200   16.5800  145.2700       4.8       269       395        77
IR     2025250    183200   16.5800  145.2600       4.7       270       390        76
IR     2025250    183200   16.5800  144.5600       5.0       229       296        85
IR     2025250    183200   16.5800  144.4500       6.8       213       311        68
IR     2025250    183200   16.6500  144.3700       7.7       208       309        79
IR     2025250    183200   16.5900  144.2400       6.1       208       331        68
IR     2025250    183200   16.5900  144.1400       5.6       204       321        67
IR     2025250    183200   16.6500  144.0500       5.7       202       317        75
IR     2025250    183200   16.6500  144.0100       6.3       197       318        80
IR     2025250    183200   16.6500  143.8600       7.3       189       305        83
IR     2025250    183200   16.6100  143.7800       6.2       172       264        78
IR     2025250    183200   16.6500  143.6500       6.4       167       237        85
IR     2025250    183200   16.5700  143.5700       7.6       152       232        86
IR     2025250    183200   16.5700  143.5100       8.4       154       240        90
IR     2025250    183200   16.6500  143.4400       8.7       155       253        88
IR     2025250    183200   16.5700  143.1600       6.3       165       233        91
IR     2025250    183200   16.6400  143.0700       6.6       169       234        89
IR     2025250    183200   16.6100  142.9200       5.9       157       226        95
IR     2025250    183200   16.6200  142.8600       5.5       160       238        89
IR     2025250    183200   16.6400  142.7700       4.1       162       253        66
IR     2025250    183200   16.5800  147.5200       9.9        31       954        88
IR     2025250    183200   16.5800  147.2900       5.6        13       941        78
IR     2025250    183200   16.5000  147.1800       4.7         7       956        74
IR     2025250    183200   16.5200  147.0300       5.6        19       920        78
IR     2025250    183200   16.5000  147.0100       5.5        20       923        80
IR     2025250    183200   16.5400  145.3300       4.2       267       410        74
IR     2025250    183200   16.5600  145.2900       4.8       267       403        81
IR     2025250    183200   16.5200  145.1400       4.7       265       391        78
IR     2025250    183200   16.4800  144.5600       4.9       224       320        60
IR     2025250    183200   16.5600  144.5200       5.6       223       305        78
IR     2025250    183200   16.5000  144.4100       8.3       207       337        70
IR     2025250    183200   16.5400  144.3500       8.1       209       343        77
IR     2025250    183200   16.5000  144.1800       5.4       221       332        62
IR     2025250    183200   16.4800  143.9100       6.0       183       265        69
IR     2025250    183200   16.5300  143.8100       5.9       171       242        71
IR     2025250    183200   16.5500  143.7600       5.8       163       231        71
IR     2025250    183200   16.5100  143.6600       6.3       153       229        78
IR     2025250    183200   16.5100  143.5400       8.1       153       233        80
IR     2025250    183200   16.5500  143.4900       8.6       155       242        85
IR     2025250    183200   16.5500  143.3400       7.8       164       253        88
IR     2025250    183200   16.4900  143.2600       5.3       170       230        91
IR     2025250    183200   16.4900  143.0300       4.2       140       213        98
IR     2025250    183200   16.4700  142.9100       4.0       140       217        90
IR     2025250    183200   16.4800  147.2000       4.7         6       962        73
IR     2025250    183200   16.4800  146.7400       4.7        10       852        60
IR     2025250    183200   16.4000  146.6500       4.4       351       877        63
IR     2025250    183200   16.4300  146.0400       5.0       273       633        68
IR     2025250    183200   16.3900  145.4200       4.5       290       377        74
IR     2025250    183200   16.3900  145.2800       5.3       278       393        69
IR     2025250    183200   16.4600  145.1900       5.1       265       400        78
IR     2025250    183200   16.4300  145.1500       4.9       264       397        71
IR     2025250    183200   16.4600  144.8100       4.4       274       359        72
IR     2025250    183200   16.4400  144.4000       8.1       212       331        76
IR     2025250    183200   16.4600  144.3800       8.5       212       341        79
IR     2025250    183200   16.3800  144.2100       4.8       231       333        62
IR     2025250    183200   16.4200  143.9600       5.6       187       259        61
IR     2025250    183200   16.4600  143.9200       5.9       183       265        65
IR     2025250    183200   16.4500  143.7300       5.2       158       229        70
IR     2025250    183200   16.3900  143.3900       5.9       172       244        83
IR     2025250    183200   16.3900  143.3700       5.5       173       242        85
IR     2025250    183200   16.3600  146.8500       4.4         7       948        64
IR     2025250    183200   16.3800  146.6300       4.2       346       881        64
IR     2025250    183200   16.3500  146.0700       4.7       276       723        80
IR     2025250    183200   16.3700  145.9600       4.8       275       698        72
IR     2025250    183200   16.3700  145.8600       4.5       281       690        63
IR     2025250    183200   16.3100  145.4900       4.4       286       378        83
IR     2025250    183200   16.3500  145.4500       4.2       292       377        81
IR     2025250    183200   16.3500  145.2600       4.6       277       377        84
IR     2025250    183200   16.3300  144.8400       4.1       261       343        84
IR     2025250    183200   16.3000  143.6300       5.0       166       229        78
IR     2025250    183200   16.2800  143.5400       6.1       169       229        92
IR     2025250    183200   16.3200  143.5200       6.7       168       234        93
IR     2025250    183200   16.2600  146.8200       4.0        12       937        60
IR     2025250    183200   16.2400  146.4500       4.0       324       849        77
IR     2025250    183200   16.2500  145.5300       4.9       282       464        61
IR     2025250    183200   16.2300  144.5700       4.4       225       308        75
IR     2025250    183200   16.2600  143.6300       4.4       170       229        81
IR     2025250    183200   16.2600  143.5300       5.6       170       229        92
IR     2025250    183200   16.1500  146.7200       4.1        11       893        62
IR     2025250    183200   16.1400  146.3900       4.4       316       794        81
IR     2025250    183200   16.1400  146.2900       5.0       311       741        69
IR     2025250    183200   16.1000  146.2700       5.3       313       769        74
IR     2025250    183200   16.1600  145.9100       4.9       292       795        86
IR     2025250    183200   16.1800  145.8900       4.9       289       768        73
IR     2025250    183200   16.1200  145.7300       5.5       293       786        88
IR     2025250    183200   16.1200  145.6900       5.4       292       768        84
IR     2025250    183200   16.0500  148.5100       7.3        37       918        67
IR     2025250    183200   16.0300  146.6700       4.4        12       916        69
IR     2025250    183200   16.0100  146.6300       4.1         6       923        68
IR     2025250    183200   16.0100  146.3000       4.9       314       849        66
IR     2025250    183200   16.0700  146.1900       5.8       315       843        78
IR     2025250    183200   15.9300  148.5300       6.5        24       924        77
IR     2025250    183200   15.9100  146.2600       4.2       317       891        60
IR     2025250    183200   15.9300  146.1100       5.1       317       918        64
IR     2025250    183200   15.9500  146.0700       5.5       316       920        68
IR     2025250    183200   15.9500  145.9900       5.2       316       932        73
IR     2025250    183200   15.9300  145.8600       4.8       303       959        64
IR     2025250    183200   15.8900  142.9700       4.5       103       468        61
IR     2025250    183200   15.9100  148.7000       4.1         7       978        72
IR     2025250    183200   15.8500  148.5800       4.5        16       927        81
IR     2025250    183200   15.8900  148.5400       5.0        18       929        89
IR     2025250    183200   15.8100  146.2200       4.0       325       893        80
IR     2025250    183200   15.8700  146.1200       4.2       320       912        61
IR     2025250    183200   15.8000  148.5700       4.5        15       931        81
IR     2025250    183200   15.8000  148.5600       4.5        15       938        83
IR     2025250    183200   15.8100  148.4000       5.0        30       893        66
IR     2025250    183200   15.7900  148.2800       4.7        25       898        62
IR     2025250    183200   15.7000  148.5100       4.2        15       930        91
IR     2025250    183200   15.6800  148.3900       4.5        23       904        62
IR     2025250    183200   15.7200  148.3600       4.7        25       901        60
IR     2025250    183200   15.6200  148.6600       4.2        12       957        73
IR     2025250    183200   15.6200  148.3900       4.4        22       916        60
IR     2025250    183200   15.5600  148.0300       4.2         8       854        68
IR     2025250    183200   15.4500  148.1400       4.3        15       899        64
IR     2025250    183200   15.4600  147.8900       4.1        18       878        73
IR     2025250    183200   15.4100  143.8600       4.0       132       222        69
IR     2025250    183200   15.4700  143.5600       4.1       120       186        78
IR     2025250    183200   15.2200  143.5500       4.7        78       185        73
IR     2025250    183200   15.2400  143.4200       4.4        86       186        83
IR     2025250    183200   15.2400  143.4000       4.1        88       192        91
IR     2025250    183200   15.2400  143.1300       4.0       167       261        94
IR     2025250    183200   15.1800  148.6700       4.1        22       948        89
IR     2025250    183200   15.2000  143.5300       5.1        74       185        79
IR     2025250    183200   15.2000  143.4600       4.8        76       186        92
IR     2025250    183200   15.1200  150.4600       4.4        35       987        82
IR     2025250    183200   15.0700  148.8700       5.1         5       944        84
IR     2025250    183200   15.1200  148.7800       4.4        17       943        95
IR     2025250    183200   15.1000  148.7400       4.6        18       939        92
IR     2025250    183200   15.1000  148.5900       4.7        23       930        96
IR     2025250    183200   15.0900  143.9100       4.8       135       190        66
IR     2025250    183200   15.0300  143.6000       4.6        58       190        87
IR     2025250    183200   15.0300  143.4500       4.3        77       226        83
IR     2025250    183200   15.0100  148.8500       5.1         7       934        92
IR     2025250    183200   14.9700  148.7700       5.2        14       924        95
IR     2025250    183200   14.9900  143.9200       5.0       125       186        75
IR     2025250    183200   15.0100  143.4700       4.3        70       226        84
IR     2025250    183200   14.9100  148.8100       5.4        17       927        86
IR     2025250    183200   14.9300  148.7100       5.1        16       918        95
IR     2025250    183200   14.8600  148.7800       5.2        18       929        76
IR     2025250    183200   14.8000  148.7000       4.7        10       936        83
IR     2025250    183200   14.6800  142.6400       6.2        70       250        82
IR     2025250    183200   14.6800  142.6100       6.4        67       250        83
WVCT   2025250    183200   20.7800  144.4900       8.7       138       336        81
WVCT   2025250    183200   20.6900  145.1800      10.4       143       326        63
WVCT   2025250    183200   20.7100  144.7500       9.3       144       308        69
WVCT   2025250    183200   20.7000  144.2700       7.7       176       346        71
WVCT   2025250    183200   20.7000  144.1900       7.8       189       345        69
WVCT   2025250    183200   20.6600  144.0900       7.3       175       333        79
WVCT   2025250    183200   20.6600  143.9700       8.0       150       320        91
WVCT   2025250    183200   20.6800  143.9600       8.4       146       336        86
WVCT   2025250    183200   20.7200  143.8000       5.6       153       350        70
WVCT   2025250    183200   20.5700  145.6500       8.0       152       342        70
WVCT   2025250    183200   20.6300  145.5500       8.3       155       344        86
WVCT   2025250    183200   20.5700  145.2100       9.8       153       322        67
WVCT   2025250    183200   20.6300  144.8400       7.9       149       304        63
WVCT   2025250    183200   20.6500  144.8200       8.0       148       301        67
WVCT   2025250    183200   20.6400  144.0300       7.8       159       317        87
WVCT   2025250    183200   20.6000  143.9300       8.7       152       303        71
WVCT   2025250    183200   20.6200  143.9100       8.5       149       304        77
WVCT   2025250    183200   20.6400  143.8200       7.0       149       310        63
WVCT   2025250    183200   20.4900  145.6600       8.7       167       316        72
WVCT   2025250    183200   20.5500  145.6100       8.1       159       316        78
WVCT   2025250    183200   20.5300  145.5100       8.7       169       324        83
WVCT   2025250    183200   20.4900  145.3500       9.2       170       310        65
WVCT   2025250    183200   20.5300  145.2300      10.3       157       318        60
WVCT   2025250    183200   20.5500  145.2100       9.9       153       322        66
WVCT   2025250    183200   20.5300  144.9300       7.7       146       332        81
WVCT   2025250    183200   20.5500  144.9100       7.7       150       325        69
WVCT   2025250    183200   20.3700  145.5800       8.9       166       277        84
WVCT   2025250    183200   20.4500  145.5000       8.2       170       289        74
WVCT   2025250    183200   20.3700  145.4000       6.9       167       262        75
WVCT   2025250    183200   20.3900  145.3000       7.0       171       277        65
WVCT   2025250    183200   20.3700  143.3300       6.6       146       295        63
WVCT   2025250    183200   20.3900  143.2700       6.3       156       292        84
WVCT   2025250    183200   20.3900  143.1100       5.0       195       308        79
WVCT   2025250    183200   20.3700  143.0900       4.8       190       304        79
WVCT   2025250    183200   20.2700  145.7100      12.6       155       301        83
WVCT   2025250    183200   20.3300  145.6300      10.3       162       275        84
WVCT   2025250    183200   20.3100  145.4500       8.6       153       264        97
WVCT   2025250    183200   20.3500  145.4000       7.4       163       263        83
WVCT   2025250    183200   20.2700  145.2700      10.2       154       295        70
WVCT   2025250    183200   20.3500  145.1800       8.7       149       304        63
WVCT   2025250    183200   20.2600  144.4600      18.3       112       283        75
WVCT   2025250    183200   20.2600  144.3700      16.7       116       257        82
WVCT   2025250    183200   20.2600  144.3100      12.7       125       253        84
WVCT   2025250    183200   20.3000  144.2500       9.3       139       292        78
WVCT   2025250    183200   20.3000  144.0900       8.6       215       290        75
WVCT   2025250    183200   20.2800  144.0300      10.0       226       283        68
WVCT   2025250    183200   20.3300  143.2900       6.3       153       277        72
WVCT   2025250    183200   20.2900  143.1500       6.1       157       272        78
WVCT   2025250    183200   20.3300  143.0500       5.0       169       295        88
WVCT   2025250    183200   20.3100  143.0300       5.4       161       293        85
WVCT   2025250    183200   20.1900  145.7800      12.9       148       324        83
WVCT   2025250    183200   20.2100  145.7600      12.9       149       320        81
WVCT   2025250    183200   20.1700  145.6200       9.9       138       286        69
WVCT   2025250    183200   20.1700  145.4800      13.2       131       284        79
WVCT   2025250    183200   20.1700  145.4600      14.2       132       287        77
WVCT   2025250    183200   20.1700  145.3600      14.6       143       296        76
WVCT   2025250    183200   20.1700  145.2500      12.1       146       298        83
WVCT   2025250    183200   20.1600  144.9300      18.4       103       290        62
WVCT   2025250    183200   20.1600  144.8100      19.2       109       253        66
WVCT   2025250    183200   20.2000  144.7000      17.5       111       266        65
WVCT   2025250    183200   20.2000  144.6800      17.4       112       260        70
WVCT   2025250    183200   20.2200  144.5800      18.8       112       264        71
WVCT   2025250    183200   20.2400  144.4400      18.6       113       251        82
WVCT   2025250    183200   20.2400  144.3800      18.0       114       246        85
WVCT   2025250    183200   20.1800  144.2600      10.3       144       239        74
WVCT   2025250    183200   20.2400  144.1700       7.5       165       252        87
WVCT   2025250    183200   20.2400  144.0900       7.7       195       259        75
WVCT   2025250    183200   20.2400  143.9100       8.0       203       266        60
WVCT   2025250    183200   20.1700  143.2000       6.4       148       277        61
WVCT   2025250    183200   20.2100  143.1100       8.0       141       279        64
WVCT   2025250    183200   20.0700  145.8500      13.6       146       323        83
WVCT   2025250    183200   20.1500  145.6800      10.7       142       293        71
WVCT   2025250    183200   20.0700  145.6200      14.5       133       268        89
WVCT   2025250    183200   20.0700  145.5200      14.2       130       260        92
WVCT   2025250    183200   20.1500  145.3800      14.8       142       295        78
WVCT   2025250    183200   20.0900  145.3400      14.1       139       283        78
WVCT   2025250    183200   20.1300  145.2600      12.8       141       293        78
WVCT   2025250    183200   20.0700  145.1000      15.4       115       251        77
WVCT   2025250    183200   20.0900  144.9900      18.5       106       234        70
WVCT   2025250    183200   20.1200  144.8900      19.9       109       241        75
WVCT   2025250    183200   20.1400  144.8500      19.6       110       242        69
WVCT   2025250    183200   20.0600  144.7500      16.9       137       225        77
WVCT   2025250    183200   20.1400  144.6100      16.6       125       235        82
WVCT   2025250    183200   20.1200  144.5100      14.4       134       234        85
WVCT   2025250    183200   20.0600  144.4100      11.7       154       233        88
WVCT   2025250    183200   20.0800  144.3200      11.1       146       234        87
WVCT   2025250    183200   20.1000  144.2400      10.6       146       233        94
WVCT   2025250    183200   20.1000  144.0000       8.9       169       241        78
WVCT   2025250    183200   20.1000  143.9000       9.4       155       243        97
WVCT   2025250    183200   20.0800  143.8400       9.8       151       244        93
WVCT   2025250    183200   20.1000  143.7300       7.4       163       257        65
WVCT   2025250    183200   20.0900  143.6700       6.2       178       257        64
WVCT   2025250    183200   20.0500  143.5100       5.2       169       249        81
WVCT   2025250    183200   20.1300  143.2400       5.1       161       277        72
WVCT   2025250    183200   20.1100  143.1200       6.3       161       281        79
WVCT   2025250    183200   20.1100  143.0800       6.3       161       279        82
WVCT   2025250    183200   20.0500  142.9800       5.1       167       275        75
WVCT   2025250    183200   20.0900  142.8700       4.6       140       314        70
WVCT   2025250    183200   20.0500  146.0500      13.5       148       342        84
WVCT   2025250    183200   19.9700  145.8700      15.2       142       308        79
WVCT   2025250    183200   19.9900  145.8100      15.2       140       294        80
WVCT   2025250    183200   19.9700  145.7100      15.9       143       246        93
WVCT   2025250    183200   20.0300  145.5700      15.1       135       248        95
WVCT   2025250    183200   20.0500  145.5500      14.7       133       252        95
WVCT   2025250    183200   20.0500  145.4400      13.8       136       263        86
WVCT   2025250    183200   19.9700  145.2900      15.1       133       251        94
WVCT   2025250    183200   20.0100  145.2200      15.8       128       240        90
WVCT   2025250    183200   20.0300  145.0800      16.6       117       227        85
WVCT   2025250    183200   19.9700  145.0200      16.3       131       221        84
WVCT   2025250    183200   20.0200  144.9000      16.1       130       222        83
WVCT   2025250    183200   20.0400  144.8300      17.0       137       222        81
WVCT   2025250    183200   20.0400  144.7700      17.4       140       223        76
WVCT   2025250    183200   20.0000  144.5900      14.9       143       224        86
WVCT   2025250    183200   20.0400  144.5500      15.0       141       225        88
WVCT   2025250    183200   19.9600  144.4100      11.5       163       231        92
WVCT   2025250    183200   20.0000  144.3300      12.6       146       231        97
WVCT   2025250    183200   19.9600  144.2100      10.2       174       231        90
WVCT   2025250    183200   20.0400  143.8000       9.7       146       252        71
WVCT   2025250    183200   19.9800  143.7600       8.7       154       257        68
WVCT   2025250    183200   19.9900  143.6100       8.3       149       252        74
WVCT   2025250    183200   19.9900  143.5900       7.9       151       251        79
WVCT   2025250    183200   19.9900  143.2500       5.3       204       259        76
WVCT   2025250    183200   19.9700  143.1900       5.2       199       262        73
WVCT   2025250    183200   19.9700  143.0200       4.7       194       266        77
WVCT   2025250    183200   20.0100  142.9200       4.5       175       281        83
WVCT   2025250    183200   19.9700  142.8600       4.2       181       287        81
WVCT   2025250    183200   19.9100  146.0400      14.6       148       333        82
WVCT   2025250    183200   19.8700  145.9600      14.6       146       310        81
WVCT   2025250    183200   19.8900  145.8800      14.8       142       278        66
WVCT   2025250    183200   19.9500  145.7900      16.0       139       259        92
WVCT   2025250    183200   19.9500  145.6700      16.1       143       241        86
WVCT   2025250    183200   19.9500  145.5500      14.0       148       243        95
WVCT   2025250    183200   19.8700  145.4000      13.9       139       242        95
WVCT   2025250    183200   19.9500  145.3100      14.6       136       249        96
WVCT   2025250    183200   19.8700  145.2100      14.1       138       222        88
WVCT   2025250    183200   19.9300  145.1100      16.6       130       221        84
WVCT   2025250    183200   19.9300  145.0700      16.7       131       220        83
WVCT   2025250    183200   19.9400  144.9600      15.3       137       223        83
WVCT   2025250    183200   19.9400  144.9000      15.4       142       224        82
WVCT   2025250    183200   19.9200  144.7400      16.5       138       224        78
WVCT   2025250    183200   19.9200  144.6200      15.0       138       225        86
WVCT   2025250    183200   19.9400  144.5600      13.8       145       225        89
WVCT   2025250    183200   19.9400  144.4700      11.8       153       227        94
WVCT   2025250    183200   19.9400  144.4100      11.4       163       229        88
WVCT   2025250    183200   19.9400  144.2300      11.1       165       233        88
WVCT   2025250    183200   19.8600  143.9300      11.2       216       234        70
WVCT   2025250    183200   19.9200  143.9100       9.4       200       243        62
WVCT   2025250    183200   19.9200  143.7600       8.5       167       254        82
WVCT   2025250    183200   19.8700  143.6800       8.3       176       255        84
WVCT   2025250    183200   19.9300  143.6200       8.1       159       257        81
WVCT   2025250    183200   19.9300  143.5200       7.0       159       248        77
WVCT   2025250    183200   19.8500  143.4200       6.1       158       252        84
WVCT   2025250    183200   19.9300  143.2900       5.8       203       251        71
WVCT   2025250    183200   19.9100  143.2300       5.5       201       252        80
WVCT   2025250    183200   19.9100  143.0500       4.0       194       257        86
WVCT   2025250    183200   19.9100  143.0300       4.3       196       259        87
WVCT   2025250    183200   19.8900  142.9400       5.0       191       264        85
WVCT   2025250    183200   19.8900  142.8200       4.2       181       285        76
WVCT   2025250    183200   19.7700  146.0300      13.0       152       320        67
WVCT   2025250    183200   19.8500  145.9600      14.3       147       303        80
WVCT   2025250    183200   19.7900  145.9100      11.7       152       245        75
WVCT   2025250    183200   19.8500  145.8000      13.9       141       237        72
WVCT   2025250    183200   19.8300  145.6600      12.2       145       235        82
WVCT   2025250    183200   19.7700  145.5400      13.8       141       236        94
WVCT   2025250    183200   19.8300  145.4400      14.3       138       237        91
WVCT   2025250    183200   19.8500  145.4200      14.3       139       238        92
WVCT   2025250    183200   19.7700  145.3200      12.6       138       221        88
WVCT   2025250    183200   19.8500  145.1700      13.8       137       222        87
WVCT   2025250    183200   19.8300  145.1300      14.0       137       225        86
WVCT   2025250    183200   19.8200  144.9500      13.7       145       222        88
WVCT   2025250    183200   19.7600  144.9100      12.7       145       225        86
WVCT   2025250    183200   19.8200  144.7900      13.4       144       224        76
WVCT   2025250    183200   19.7600  144.6700      12.7       142       233        82
WVCT   2025250    183200   19.8000  144.5600      12.3       143       237        77
WVCT   2025250    183200   19.7800  144.4600      10.0       151       237        76
WVCT   2025250    183200   19.8000  144.4200       9.2       158       237        69
WVCT   2025250    183200   19.8200  144.2600      11.3       149       236        91
WVCT   2025250    183200   19.7600  144.2200       9.7       166       240        86
WVCT   2025250    183200   19.8400  143.9700      12.5       222       228        63
WVCT   2025250    183200   19.8200  143.9500      11.5       216       229        76
WVCT   2025250    183200   19.7600  143.7900      10.7       214       238        66
WVCT   2025250    183200   19.7600  143.7100      10.7       214       248        67
WVCT   2025250    183200   19.8100  143.5800       7.7       194       253        87
WVCT   2025250    183200   19.7900  143.5600       7.6       198       252        86
WVCT   2025250    183200   19.7900  143.3800       6.0       158       256        80
WVCT   2025250    183200   19.7700  143.3400       5.7       172       261        75
WVCT   2025250    183200   19.7500  143.2000       6.7       214       256        73
WVCT   2025250    183200   19.7500  143.0900       5.1       199       248        72
WVCT   2025250    183200   19.7500  142.9900       4.4       175       253        81
WVCT   2025250    183200   19.7700  142.9700       4.5       174       256        85
WVCT   2025250    183200   19.7700  142.7900       4.6       170       265        88
WVCT   2025250    183200   19.7700  142.7700       4.6       169       271        86
WVCT   2025250    183200   19.7000  146.1000      11.2       151       342        67
WVCT   2025250    183200   19.7500  146.0300      12.4       153       311        67
WVCT   2025250    183200   19.7500  145.8900      10.4       155       243        74
WVCT   2025250    183200   19.7100  145.7700      10.4       149       239        87
WVCT   2025250    183200   19.7100  145.7500      10.6       145       237        89
WVCT   2025250    183200   19.7100  145.5700      15.2       142       236        91
WVCT   2025250    183200   19.7500  145.5200      14.6       141       236        92
WVCT   2025250    183200   19.7100  145.4100      14.2       138       228        93
WVCT   2025250    183200   19.7500  145.3400      13.1       139       221        92
WVCT   2025250    183200   19.6700  145.2200      13.3       138       226        95
WVCT   2025250    183200   19.7500  145.1000      13.8       140       228        86
WVCT   2025250    183200   19.7300  145.0600      13.8       140       228        83
WVCT   2025250    183200   19.7400  144.9100      12.4       144       226        75
WVCT   2025250    183200   19.7200  144.8100      11.2       149       228        76
WVCT   2025250    183200   19.7200  144.7300      11.4       148       229        78
WVCT   2025250    183200   19.7400  144.6700      12.3       145       233        76
WVCT   2025250    183200   19.7000  144.4900      12.9       136       242        78
WVCT   2025250    183200   19.6600  144.3900      15.2       125       243        82
WVCT   2025250    183200   19.6600  144.3700      15.1       125       243        81
WVCT   2025250    183200   19.7400  144.2000       9.2       177       241        77
WVCT   2025250    183200   19.7200  144.1000      11.1       218       241        68
WVCT   2025250    183200   19.7400  143.9400      11.9       221       230        68
WVCT   2025250    183200   19.6600  143.8600      13.8       235       233        68
WVCT   2025250    183200   19.7000  143.7100      12.7       228       241        63
WVCT   2025250    183200   19.6700  143.5100       9.7       212       246        78
WVCT   2025250    183200   19.6500  143.4900      10.0       211       246        77
WVCT   2025250    183200   19.7300  143.3400       5.6       171       267        80
WVCT   2025250    183200   19.7100  143.2600       5.6       195       272        76
WVCT   2025250    183200   19.7300  143.1800       6.9       214       254        73
WVCT   2025250    183200   19.6700  143.1000       6.5       204       252        85
WVCT   2025250    183200   19.6500  143.0000       4.9       200       252        82
WVCT   2025250    183200   19.6600  146.1200       9.5       153       347        67
WVCT   2025250    183200   19.6500  146.0000       8.9       155       268        65
WVCT   2025250    183200   19.5700  145.8600      14.1       155       245        86
WVCT   2025250    183200   19.5900  145.8200      13.8       155       244        86
WVCT   2025250    183200   19.6100  145.6600      14.6       140       240        92
WVCT   2025250    183200   19.5700  145.6200      15.5       136       236        94
WVCT   2025250    183200   19.5700  145.5000      15.2       138       228        93
WVCT   2025250    183200   19.6100  145.4100      15.0       134       223        94
WVCT   2025250    183200   19.5700  145.2900      15.6       121       228        96
WVCT   2025250    183200   19.6500  145.2100      14.0       136       228        95
WVCT   2025250    183200   19.6500  145.1000      14.8       137       233        87
WVCT   2025250    183200   19.5700  145.0100      17.6       120       246        83
WVCT   2025250    183200   19.5900  144.9400      15.0       126       247        84
WVCT   2025250    183200   19.6400  144.7800      12.9       133       242        95
WVCT   2025250    183200   19.6400  144.7200      12.5       137       240        90
WVCT   2025250    183200   19.5800  144.6000      11.2       148       245        73
WVCT   2025250    183200   19.5800  144.5400      10.7       156       245        86
WVCT   2025250    183200   19.5800  144.4100      14.4       128       246        81
WVCT   2025250    183200   19.5600  144.1900      10.3       184       242        65
WVCT   2025250    183200   19.5600  144.1500       9.9       187       246        70
WVCT   2025250    183200   19.5600  144.0700       9.4       182       255        81
WVCT   2025250    183200   19.5600  143.9500       9.7       214       258        80
WVCT   2025250    183200   19.6400  143.8400      14.3       237       235        65
WVCT   2025250    183200   19.6300  143.6100      13.2       230       241        62
WVCT   2025250    183200   19.6100  143.5900      13.3       228       242        65
WVCT   2025250    183200   19.6100  143.4500       9.9       209       246        75
WVCT   2025250    183200   19.5500  143.3900       8.9       206       248        72
WVCT   2025250    183200   19.6300  143.2400       5.0       187       278        65
WVCT   2025250    183200   19.6300  143.2000       5.3       193       283        71
WVCT   2025250    183200   19.6300  143.0800       6.1       201       268        80
WVCT   2025250    183200   19.5500  142.9800       6.4       212       258        84
WVCT   2025250    183200   19.6300  142.7300       6.1       159       264        67
WVCT   2025250    183200   19.6300  142.5700       5.2       165       284        60
WVCT   2025250    183200   19.5000  146.1100       7.2       153       303        80
WVCT   2025250    183200   19.5200  146.0700       8.2       152       286        80
WVCT   2025250    183200   19.4700  145.8900      16.1       150       239        87
WVCT   2025250    183200   19.4700  145.8700      16.4       150       237        86
WVCT   2025250    183200   19.4900  145.7500      15.2       148       235        81
WVCT   2025250    183200   19.4900  145.6000      14.4       130       225        97
WVCT   2025250    183200   19.5500  145.5200      15.2       137       227        94
WVCT   2025250    183200   19.5100  145.4800      15.1       138       224        93
WVCT   2025250    183200   19.5300  145.3200      16.4       114       235        93
WVCT   2025250    183200   19.5500  145.2900      15.7       117       237        99
WVCT   2025250    183200   19.5500  145.1900      15.5       123       240        85
WVCT   2025250    183200   19.5300  145.0100      18.7       114       247        86
WVCT   2025250    183200   19.4700  144.9700      19.8       106       248        86
WVCT   2025250    183200   19.5400  144.8200      18.1       113       248        83
WVCT   2025250    183200   19.5200  144.7600      20.6       108       245        88
WVCT   2025250    183200   19.5400  144.6600      14.2       119       246        90
WVCT   2025250    183200   19.4600  144.6000      10.1       116       244        82
WVCT   2025250    183200   19.4800  144.4600       9.2       139       246        89
WVCT   2025250    183200   19.4600  144.3200      10.6       164       235        60
WVCT   2025250    183200   19.5400  144.1700      10.3       187       237        73
WVCT   2025250    183200   19.5200  144.0500       9.7       174       240        81
WVCT   2025250    183200   19.5000  143.9300       8.9       200       241        79
WVCT   2025250    183200   19.4800  143.8900       9.4       206       237        80
WVCT   2025250    183200   19.4800  143.8100      10.5       222       259        83
WVCT   2025250    183200   19.5200  143.5400      12.1       218       250        61
WVCT   2025250    183200   19.4900  143.5000      11.1       213       249        61
WVCT   2025250    183200   19.4500  143.3600       9.3       197       244        81
WVCT   2025250    183200   19.4500  143.2700       8.3       186       251        64
WVCT   2025250    183200   19.5300  143.1900       5.2       167       265        61
WVCT   2025250    183200   19.5300  142.9600       6.6       213       258        84
WVCT   2025250    183200   19.5300  142.9400       6.2       212       256        83
WVCT   2025250    183200   19.5300  142.7200       5.1       165       269        88
WVCT   2025250    183200   19.5300  142.5900       4.8       176       281        85
WVCT   2025250    183200   19.3800  146.1600       9.3       153       312        67
WVCT   2025250    183200   19.3800  146.0200      15.4       147       247        89
WVCT   2025250    183200   19.4000  145.9500      16.5       147       238        87
WVCT   2025250    183200   19.3700  145.8500      17.1       146       232        76
WVCT   2025250    183200   19.4500  145.7700      15.9       148       233        79
WVCT   2025250    183200   19.4300  145.6700      15.1       137       230        87
WVCT   2025250    183200   19.4100  145.5500      14.8       138       218        92
WVCT   2025250    183200   19.4100  145.5100      14.9       139       220        93
WVCT   2025250    183200   19.4100  145.4200      15.4       128       241        98
WVCT   2025250    183200   19.4500  145.3200      15.7       114       249        64
WVCT   2025250    183200   19.3700  145.0800      20.4       102       240        75
WVCT   2025250    183200   19.4100  144.9400      19.4       106       240        89
WVCT   2025250    183200   19.3700  144.8400      20.5       107       225        83
WVCT   2025250    183200   19.3700  144.7700      21.9       106       223        72
WVCT   2025250    183200   19.3600  144.7300      20.8       105       223        71
WVCT   2025250    183200   19.4000  144.6100      12.4       105       235        92
WVCT   2025250    183200   19.4000  144.4900       9.8       116       242        88
WVCT   2025250    183200   19.4200  144.4000      11.0       137       242        75
WVCT   2025250    183200   19.4400  144.3200      10.6       162       233        65
WVCT   2025250    183200   19.4000  144.1600       9.3       176       229        64
WVCT   2025250    183200   19.4200  144.0600      10.3       172       230        68
WVCT   2025250    183200   19.4400  143.9700      10.4       184       228        61
WVCT   2025250    183200   19.4400  143.9100       9.8       196       227        65
WVCT   2025250    183200   19.4200  143.8300      10.2       215       231        72
WVCT   2025250    183200   19.3600  143.7300      10.0       220       235        72
WVCT   2025250    183200   19.3600  143.6300      10.2       220       271        82
WVCT   2025250    183200   19.4400  143.4800       9.5       206       254        65
WVCT   2025250    183200   19.4300  143.4400       9.4       202       248        70
WVCT   2025250    183200   19.3500  143.2800      10.3       167       252        60
WVCT   2025250    183200   19.4100  143.0900       6.8       168       267        61
WVCT   2025250    183200   19.4100  143.0100       6.2       194       274        74
WVCT   2025250    183200   19.3700  142.9300       6.2       206       273        84
WVCT   2025250    183200   19.3700  142.6000       4.5       166       287        78
WVCT   2025250    183200   19.2800  146.1500      13.1       157       285        72
WVCT   2025250    183200   19.3000  146.1000      15.0       154       255        86
WVCT   2025250    183200   19.3200  146.0000      16.6       149       230        86
WVCT   2025250    183200   19.3500  145.8400      16.5       146       232        73
WVCT   2025250    183200   19.2900  145.7400      14.7       138       227        86
WVCT   2025250    183200   19.2900  145.6200      16.0       126       219        93
WVCT   2025250    183200   19.3100  145.6100      15.8       127       219        94
WVCT   2025250    183200   19.3500  145.4900      14.7       133       228        87
WVCT   2025250    183200   19.2700  145.3500      18.1       104       245        94
WVCT   2025250    183200   19.2700  145.2500      20.2        91       227        84
WVCT   2025250    183200   19.2900  145.2100      20.8        88       227        77
WVCT   2025250    183200   19.2900  144.9400      17.4       114       211        77
WVCT   2025250    183200   19.3500  144.8600      19.6       109       222        84
WVCT   2025250    183200   19.3500  144.7600      21.5       107       217        73
WVCT   2025250    183200   19.3400  144.7300      20.3       106       220        73
WVCT   2025250    183200   19.2800  144.6200      10.3       124       216        94
WVCT   2025250    183200   19.3200  144.4500      13.0       132       227        77
WVCT   2025250    183200   19.3400  144.4300      13.6       130       232        77
WVCT   2025250    183200   19.2800  144.2500      11.0       154       216        78
WVCT   2025250    183200   19.2800  144.2100       9.7       155       217        72
WVCT   2025250    183200   19.2800  144.1000      10.2       152       221        75
WVCT   2025250    183200   19.2600  143.9800      11.7       172       224        85
WVCT   2025250    183200   19.2800  143.9200      11.7       189       230        79
WVCT   2025250    183200   19.3400  143.7100      10.1       222       231        69
WVCT   2025250    183200   19.3000  143.6500      10.0       223       230        68
WVCT   2025250    183200   19.2600  143.5500       9.5       217       247        84
WVCT   2025250    183200   19.3400  143.4200       8.2       184       256        84
WVCT   2025250    183200   19.3100  143.3600       8.1       162       254        84
WVCT   2025250    183200   19.3300  143.2400      10.4       168       258        69
WVCT   2025250    183200   19.3300  143.0900       7.5       184       262        70
WVCT   2025250    183200   19.2700  143.0200       5.8       189       270        64
WVCT   2025250    183200   19.3300  142.9100       5.2       203       273        84
WVCT   2025250    183200   19.2900  142.8700       4.1       194       267        83
WVCT   2025250    183200   19.3100  142.6400       4.1       164       293        74
WVCT   2025250    183200   19.2000  146.2100      12.6       151       329        69
WVCT   2025250    183200   19.2200  146.1100      15.2       156       251        84
WVCT   2025250    183200   19.2600  146.0900      15.4       155       249        87
WVCT   2025250    183200   19.1800  145.9100      11.1       128       233        86
WVCT   2025250    183200   19.2000  145.8900      12.1       131       235        83
WVCT   2025250    183200   19.2500  145.7600      14.0       133       232        91
WVCT   2025250    183200   19.1900  145.6400      14.8       112       224        72
WVCT   2025250    183200   19.2500  145.5800      15.6       118       226        95
WVCT   2025250    183200   19.1900  145.4200      15.6       118       233        92
WVCT   2025250    183200   19.2100  145.4000      15.6       115       239        94
WVCT   2025250    183200   19.2500  145.2900      19.5        94       227        86
WVCT   2025250    183200   19.1700  145.1700      22.4        89       204        82
WVCT   2025250    183200   19.2500  145.0700      19.7       100       213        70
WVCT   2025250    183200   19.1900  144.9500      18.8       112       198        84
WVCT   2025250    183200   19.1900  144.9100      17.7       115       198        81
WVCT   2025250    183200   19.2300  144.8000      17.7       122       202        87
WVCT   2025250    183200   19.1900  144.7200      14.7       133       202        83
WVCT   2025250    183200   19.2400  144.6000       9.2       140       211        95
WVCT   2025250    183200   19.1600  144.4600      10.6       163       210        83
WVCT   2025250    183200   19.2000  144.3900      13.5       147       211        72
WVCT   2025250    183200   19.1800  144.3300      13.2       156       210        76
WVCT   2025250    183200   19.2000  144.1700      12.0       148       213        82
WVCT   2025250    183200   19.2000  144.0500      11.8       153       215        72
WVCT   2025250    183200   19.1600  143.9700      13.4       161       218        84
WVCT   2025250    183200   19.1600  143.9300      13.0       167       221        83
WVCT   2025250    183200   19.1600  143.8000      11.1       180       232        64
WVCT   2025250    183200   19.2400  143.5700       9.4       217       222        77
WVCT   2025250    183200   19.2000  143.4900       8.8       208       224        68
WVCT   2025250    183200   19.1600  143.2900       4.8       203       249        76
WVCT   2025250    183200   19.2300  143.1800       9.1       189       262        61
WVCT   2025250    183200   19.1000  146.2000      13.8       148       309        83
WVCT   2025250    183200   19.1000  146.1600      13.8       150       266        85
WVCT   2025250    183200   19.1000  146.0200       9.9       137       225        74
WVCT   2025250    183200   19.1000  145.9600       8.8       123       229        86
WVCT   2025250    183200   19.1000  145.8900       9.5       109       238        88
WVCT   2025250    183200   19.0800  145.7300      13.1       112       229        81
WVCT   2025250    183200   19.1100  145.6100      15.9       107       228        68
WVCT   2025250    183200   19.0700  145.5100      16.4       121       210        69
WVCT   2025250    183200   19.1100  145.5000      16.3       121       220        71
WVCT   2025250    183200   19.0900  145.3400      16.9       136       208        64
WVCT   2025250    183200   19.1300  145.2800      16.8       110       208        93
WVCT   2025250    183200   19.1500  145.1800      22.2        88       201        82
WVCT   2025250    183200   19.1500  145.1100      21.1        92       195        73
WVCT   2025250    183200   19.0700  144.9600      14.5       121       191        73
WVCT   2025250    183200   19.0900  144.8500      14.7       127       192        91
WVCT   2025250    183200   19.1500  144.7300      14.4       138       197        83
WVCT   2025250    183200   19.0900  144.6300      10.5       167       193        77
WVCT   2025250    183200   19.1300  144.5800      10.6       157       202        81
WVCT   2025250    183200   19.1000  144.4600      10.0       160       208        88
WVCT   2025250    183200   19.1200  144.3400      12.7       159       210        80
WVCT   2025250    183200   19.1200  144.2800      13.5       157       211        84
WVCT   2025250    183200   19.0600  144.1600      16.3       162       217        87
WVCT   2025250    183200   19.0800  144.0700      14.8       158       218        73
WVCT   2025250    183200   19.1000  143.9900      15.0       158       219        87
WVCT   2025250    183200   19.1400  143.9300      13.3       165       221        81
WVCT   2025250    183200   19.0800  143.8300      11.7       166       232        64
WVCT   2025250    183200   19.0600  143.6800       7.0       178       229        66
WVCT   2025250    183200   19.0600  143.5800       7.8       196       219        73
WVCT   2025250    183200   19.1400  143.2700       4.7       211       249        75
WVCT   2025250    183200   19.1200  143.2500       4.9       213       249        75
WVCT   2025250    183200   19.0400  146.2400      14.2       149       329        78
WVCT   2025250    183200   19.0600  146.1600      13.6       151       248        80
WVCT   2025250    183200   19.0400  146.0400       8.9       131       226        66
WVCT   2025250    183200   19.0400  146.0200       8.3       125       226        71
WVCT   2025250    183200   19.0000  145.8400       9.9        96       237        90
WVCT   2025250    183200   19.0200  145.7600      12.1       106       237        96
WVCT   2025250    183200   19.0000  145.6800      13.3       121       231        85
WVCT   2025250    183200   19.0100  145.6100      16.3       129       226        83
WVCT   2025250    183200   19.0500  145.5300      16.4       120       210        74
WVCT   2025250    183200   18.9700  145.3700      17.2       150       199        68
WVCT   2025250    183200   19.0100  145.3300      17.2       149       197        69
WVCT   2025250    183200   18.9700  145.1500      18.5        96       189        75
WVCT   2025250    183200   19.0300  145.1400      19.1        95       190        78
WVCT   2025250    183200   19.0500  144.9600      14.4       119       189        73
WVCT   2025250    183200   19.0500  144.9400      14.5       122       189        74
WVCT   2025250    183200   18.9900  144.8400      10.7       136       180        93
WVCT   2025250    183200   19.0100  144.6900       8.5       180       187        76
WVCT   2025250    183200   18.9700  144.5500       8.0       209       188        73
WVCT   2025250    183200   18.9700  144.4100       8.7       218       196        83
WVCT   2025250    183200   19.0000  144.3400       9.5       180       207        84
WVCT   2025250    183200   19.0000  144.1800      16.1       162       217        79
WVCT   2025250    183200   18.9800  144.1200      15.3       165       222        82
WVCT   2025250    183200   18.9600  143.9800      12.7       167       226        86
WVCT   2025250    183200   19.0400  143.9500      13.3       160       223        91
WVCT   2025250    183200   19.0200  143.7700       8.2       159       230        69
WVCT   2025250    183200   19.0400  143.6600       6.8       177       228        67
WVCT   2025250    183200   18.9800  143.5000      10.6       211       219        84
WVCT   2025250    183200   18.9600  143.4800      11.5       210       219        83
WVCT   2025250    183200   19.0200  143.2900       7.5       206       220        75
WVCT   2025250    183200   18.8800  146.2300      11.2       146       292        84
WVCT   2025250    183200   18.9200  146.2100      12.3       146       278        80
WVCT   2025250    183200   18.8800  146.0300       9.0       123       231        77
WVCT   2025250    183200   18.9600  146.0100       8.2       124       231        73
WVCT   2025250    183200   18.9400  145.8600       9.2        99       241        87
WVCT   2025250    183200   18.9000  145.7600      11.8       113       242        91
WVCT   2025250    183200   18.8800  145.6400      15.2       135       215        71
WVCT   2025250    183200   18.9600  145.6000      17.4       136       212        86
WVCT   2025250    183200   18.8800  145.5200      15.3       128       202        66
WVCT   2025250    183200   18.8700  145.3400      14.6       134       193        83
WVCT   2025250    183200   18.8900  145.3100      14.9       137       192        73
WVCT   2025250    183200   18.9100  145.2100      16.3        99       188        82
WVCT   2025250    183200   18.8700  145.0500      22.1        91       173        62
WVCT   2025250    183200   18.8700  145.0100      22.1        94       171        65
WVCT   2025250    183200   18.9300  144.9400      14.1       109       173        61
WVCT   2025250    183200   18.9500  144.7800       8.6       144       172        69
WVCT   2025250    183200   18.9300  144.7000      11.3       142       170        63
WVCT   2025250    183200   18.9500  144.5300       8.5       224       187        83
WVCT   2025250    183200   18.8900  144.3900      12.6       246       185        68
WVCT   2025250    183200   18.9000  144.0800      12.8       179       223        72
WVCT   2025250    183200   18.9400  143.9800      12.6       172       226        82
WVCT   2025250    183200   18.9200  143.8100      11.2       149       221        68
WVCT   2025250    183200   18.8800  143.7700      10.8       148       219        77
WVCT   2025250    183200   18.8800  143.6300       7.3       163       226        91
WVCT   2025250    183200   18.9200  143.5700       8.4       188       227        85
WVCT   2025250    183200   18.9000  143.4000      13.1       199       219        81
WVCT   2025250    183200   18.8600  143.3600      11.7       201       228        82
WVCT   2025250    183200   18.8800  143.2400       5.3       199       225        75
WVCT   2025250    183200   18.9000  142.9500       9.7       206       270        81
WVCT   2025250    183200   18.7800  146.2800       7.4       121       339        80
WVCT   2025250    183200   18.8600  146.2000      10.5       142       274        81
WVCT   2025250    183200   18.8600  146.0500       9.5       127       231        73
WVCT   2025250    183200   18.8200  146.0100      10.2       124       233        86
WVCT   2025250    183200   18.8200  145.8300      10.3       101       233        93
WVCT   2025250    183200   18.8400  145.7900      11.6       107       235        95
WVCT   2025250    183200   18.8600  145.6600      14.0       131       219        76
WVCT   2025250    183200   18.8200  145.5900      14.2       125       203        65
WVCT   2025250    183200   18.8000  145.5000      13.9       116       198        77
WVCT   2025250    183200   18.7800  145.4000      14.1       137       190        86
WVCT   2025250    183200   18.8100  145.2600      14.2       129       181        74
WVCT   2025250    183200   18.8500  145.1500      21.0        93       174        63
WVCT   2025250    183200   18.8500  145.0300      23.3        92       170        64
WVCT   2025250    183200   18.7900  144.8500      16.9       104       162        62
WVCT   2025250    183200   18.7700  144.7500      13.7       114       162        84
WVCT   2025250    183200   18.7700  144.7300      12.7       117       162        77
WVCT   2025250    183200   18.8500  144.4600      10.8       248       172        72
WVCT   2025250    183200   18.8500  144.1900       8.7       225       201        61
WVCT   2025250    183200   18.7700  144.0900      10.0       218       195        60
WVCT   2025250    183200   18.8400  144.0400      17.5       167       222        65
WVCT   2025250    183200   18.8000  143.8800      17.2       163       217        63
WVCT   2025250    183200   18.8000  143.8600      16.3       162       216        73
WVCT   2025250    183200   18.8000  143.6800      10.1       162       219        91
WVCT   2025250    183200   18.8000  143.5900      11.5       166       227        86
WVCT   2025250    183200   18.7800  143.5700      12.8       165       231        84
WVCT   2025250    183200   18.7800  143.3900      12.7       191       244        64
WVCT   2025250    183200   18.8400  143.3400      10.8       203       231        81
WVCT   2025250    183200   18.8200  143.1000       4.1       188       243        82
WVCT   2025250    183200   18.7600  143.0800       4.1       191       246        85
WVCT   2025250    183200   18.8400  142.9300       9.3       203       269        85
WVCT   2025250    183200   18.7200  146.2900       6.7       112       335        68
WVCT   2025250    183200   18.7600  146.0200      10.6       111       233        93
WVCT   2025250    183200   18.6800  145.9200       9.6       110       228        86
WVCT   2025250    183200   18.7200  145.9000      10.5       112       228        85
WVCT   2025250    183200   18.7200  145.8000      12.4        96       214        70
WVCT   2025250    183200   18.7600  145.6900      13.1       106       207        75
WVCT   2025250    183200   18.7400  145.5900      12.7       106       199        65
WVCT   2025250    183200   18.7000  145.4900      11.0       116       189        72
WVCT   2025250    183200   18.6800  145.3500      13.2       150       180        69
WVCT   2025250    183200   18.7200  145.3100      14.3       147       177        79
WVCT   2025250    183200   18.7300  145.2200      14.2       120       166        89
WVCT   2025250    183200   18.7500  144.9100      24.9        96       157        71
WVCT   2025250    183200   18.6700  144.7900      14.5       126       155        68
WVCT   2025250    183200   18.7300  144.3600      14.3       155       168        96
WVCT   2025250    183200   18.7300  144.3400      16.8       152       168        89
WVCT   2025250    183200   18.6800  143.8700      18.9       165       208        83
WVCT   2025250    183200   18.6600  143.8500      17.3       166       207        83
WVCT   2025250    183200   18.6600  143.7200      10.7       160       212        93
WVCT   2025250    183200   18.7200  143.6200      10.8       166       220        75
WVCT   2025250    183200   18.6800  143.5000      11.8       172       238        87
WVCT   2025250    183200   18.6800  143.4300      10.1       183       248        82
WVCT   2025250    183200   18.7000  143.2900       7.5       209       248        68
WVCT   2025250    183200   18.6800  143.2700       6.7       209       249        68
WVCT   2025250    183200   18.6600  146.2900       5.6        85       317        64
WVCT   2025250    183200   18.6600  146.1500       7.4       107       241        72
WVCT   2025250    183200   18.6600  146.0900       7.9       104       236        84
WVCT   2025250    183200   18.6600  145.9200       9.1       108       227        86
WVCT   2025250    183200   18.6400  145.8200      11.9        90       212        64
WVCT   2025250    183200   18.6400  145.7800      13.2        86       209        70
WVCT   2025250    183200   18.5800  145.6400      11.2        88       197        84
WVCT   2025250    183200   18.6400  145.6000      11.3        96       194        74
WVCT   2025250    183200   18.5800  145.5000       8.4       119       186        66
WVCT   2025250    183200   18.6600  145.3700      13.1       155       181        66
WVCT   2025250    183200   18.6600  145.3100      13.6       157       169        68
WVCT   2025250    183200   18.6200  145.1900      11.2       139       159        60
WVCT   2025250    183200   18.6200  145.1100      14.1       113       154        66
WVCT   2025250    183200   18.6300  144.3600       9.5       138       166        78
WVCT   2025250    183200   18.6100  144.3300       9.0       131       166        76
WVCT   2025250    183200   18.6300  144.2400      17.3       138       170        77
WVCT   2025250    183200   18.6300  144.0600       9.1       171       183        73
WVCT   2025250    183200   18.5900  143.9800      13.1       177       190        73
WVCT   2025250    183200   18.6100  143.8700      16.3       173       203        82
WVCT   2025250    183200   18.6300  143.8300      15.1       168       205        81
WVCT   2025250    183200   18.5700  143.7500      10.4       175       205        82
WVCT   2025250    183200   18.5600  143.5900       9.5       190       219        65
WVCT   2025250    183200   18.6000  143.4800       9.2       194       232        85
WVCT   2025250    183200   18.5600  143.3800       7.6       203       246        82
WVCT   2025250    183200   18.5600  143.3600       7.3       201       249        82
WVCT   2025250    183200   18.6400  143.2300       6.2       205       253        79
WVCT   2025250    183200   18.4900  146.3000       8.9        36       336        61
WVCT   2025250    183200   18.5100  146.2600       7.4        33       295        62
WVCT   2025250    183200   18.4800  145.7100      11.3        71       201        84
WVCT   2025250    183200   18.5600  145.6600      11.3        88       199        86
WVCT   2025250    183200   18.5300  144.7800      19.0       142       152        82
WVCT   2025250    183200   18.4700  144.6600      17.9       163       158        65
WVCT   2025250    183200   18.5100  144.2300       8.3       134       170        82
WVCT   2025250    183200   18.4900  144.1000      16.0       163       179        86
WVCT   2025250    183200   18.5300  143.9800      15.4       177       187        72
WVCT   2025250    183200   18.5300  143.7100      11.1       177       209        77
WVCT   2025250    183200   18.5400  143.5700      10.1       194       221        66
WVCT   2025250    183200   18.4700  143.4700      11.2       204       228        65
WVCT   2025250    183200   18.4600  143.4500      11.1       205       229        64
WVCT   2025250    183200   18.5400  143.3600       7.8       201       246        81
WVCT   2025250    183200   18.4600  143.2600       9.1       180       259        75
WVCT   2025250    183200   18.4800  143.1700       9.0       196       262        84
WVCT   2025250    183200   18.3900  146.5500       9.9       127       350        68
WVCT   2025250    183200   18.4700  146.3000       8.8        36       337        61
WVCT   2025250    183200   18.4500  146.2800       8.9        32       318        65
WVCT   2025250    183200   18.4200  145.8800       6.7        64       204        68
WVCT   2025250    183200   18.4600  145.7100      11.8        65       199        85
WVCT   2025250    183200   18.4400  145.3600      12.7       164       169        63
WVCT   2025250    183200   18.4600  145.0700      14.8       102       141        71
WVCT   2025250    183200   18.4000  144.9500       8.2       119       141        65
WVCT   2025250    183200   18.4100  144.4200      11.3       203       163        84
WVCT   2025250    183200   18.4100  144.2500      10.2       159       168        80
WVCT   2025250    183200   18.3900  144.1500      13.7       168       175        78
WVCT   2025250    183200   18.3700  144.1300      14.2       171       177        85
WVCT   2025250    183200   18.4100  144.0300      19.6       171       184        75
WVCT   2025250    183200   18.3700  143.8400      17.8       184       196        72
WVCT   2025250    183200   18.4300  143.4900      11.7       194       230        67
WVCT   2025250    183200   18.4400  143.3800      10.0       183       240        68
WVCT   2025250    183200   18.4000  143.3000      11.0       163       259        76
WVCT   2025250    183200   18.4400  143.2600       9.0       173       260        76
WVCT   2025250    183200   18.4000  143.1600       9.9       186       264        87
WVCT   2025250    183200   18.3600  143.0400       7.7       188       260        83
WVCT   2025250    183200   18.3700  146.5400       9.4       122       348        67
WVCT   2025250    183200   18.3100  146.2900       8.5        35       331        92
WVCT   2025250    183200   18.3700  146.2500       8.2        30       299        69
WVCT   2025250    183200   18.2900  146.1300       6.0        69       249        86
WVCT   2025250    183200   18.3700  146.0400       7.6        44       219        72
WVCT   2025250    183200   18.3300  145.9700       9.3        45       208        70
WVCT   2025250    183200   18.3300  145.8000       9.6        55       198        84
WVCT   2025250    183200   18.3400  145.7000      11.3        69       194        72
WVCT   2025250    183200   18.3000  145.4300      11.5        82       169        88
WVCT   2025250    183200   18.2800  145.1100      14.7       107       136        81
WVCT   2025250    183200   18.3200  145.0200      13.2       110       140        80
WVCT   2025250    183200   18.3000  144.9400      14.6       112       147        67
WVCT   2025250    183200   18.3000  144.8600      11.6       135       149        61
WVCT   2025250    183200   18.2800  144.6300      15.1       174       167        62
WVCT   2025250    183200   18.2700  144.4100      16.0       189       174        82
WVCT   2025250    183200   18.3300  144.3000      13.7       174       167        62
WVCT   2025250    183200   18.2900  144.1400      11.4       169       173        87
WVCT   2025250    183200   18.2700  144.1200      11.4       166       176        96
WVCT   2025250    183200   18.2700  144.0100      12.9       168       187        83
WVCT   2025250    183200   18.3100  143.9300      15.1       176       188        91
WVCT   2025250    183200   18.2700  143.8100      13.1       183       196        73
WVCT   2025250    183200   18.2900  143.7000      15.6       177       214        68
WVCT   2025250    183200   18.2900  143.5600      17.5       169       227        82
WVCT   2025250    183200   18.3500  143.5100      14.1       174       236        70
WVCT   2025250    183200   18.3100  143.4500      14.6       168       247        80
WVCT   2025250    183200   18.2700  143.3500      12.4       157       259        90
WVCT   2025250    183200   18.3500  143.2200      10.5       165       264        87
WVCT   2025250    183200   18.2900  143.1000       9.1       183       269        87
WVCT   2025250    183200   18.2700  143.0600       8.7       184       268        79
WVCT   2025250    183200   18.3400  142.6400       4.2       183       269        70
WVCT   2025250    183200   18.1900  146.4700       7.7        65       307        68
WVCT   2025250    183200   18.2300  146.4200      10.3        48       330        85
WVCT   2025250    183200   18.2700  146.2800       8.1        36       328        94
WVCT   2025250    183200   18.2100  146.1200       6.8       104       234        82
WVCT   2025250    183200   18.1900  146.0400       8.3        72       215        67
WVCT   2025250    183200   18.1900  145.9500      12.5        43       210        88
WVCT   2025250    183200   18.1900  145.7900      12.6        48       197        92
WVCT   2025250    183200   18.2100  145.6900      10.6        72       186        73
WVCT   2025250    183200   18.2600  145.6600      11.1        83       182        68
WVCT   2025250    183200   18.2600  145.4400      11.3        78       169        72
WVCT   2025250    183200   18.1800  145.1500      14.1       115       144        94
WVCT   2025250    183200   18.1800  145.0300      13.5       113       155        76
WVCT   2025250    183200   18.1800  144.9900      12.2       114       158        71
WVCT   2025250    183200   18.2200  144.9000      12.9       123       154        66
WVCT   2025250    183200   18.2400  144.7200      14.9       161       159        77
WVCT   2025250    183200   18.1800  144.6800      14.4       164       170        92
WVCT   2025250    183200   18.1800  144.5600      14.3       176       175        81
WVCT   2025250    183200   18.2600  144.4500      15.1       189       176        85
WVCT   2025250    183200   18.2400  144.3900      16.3       186       174        90
WVCT   2025250    183200   18.2500  144.2400      12.9       172       169        85
WVCT   2025250    183200   18.2300  144.1800      10.6       169       171        82
WVCT   2025250    183200   18.1900  144.0600      12.3       161       183        84
WVCT   2025250    183200   18.2100  144.0200      11.6       161       186        83
WVCT   2025250    183200   18.1700  143.8900      11.2       176       191        90
WVCT   2025250    183200   18.2100  143.7700      12.3       185       203        67
WVCT   2025250    183200   18.2500  143.7200      13.9       179       213        68
WVCT   2025250    183200   18.1900  143.6400      12.4       172       225        88
WVCT   2025250    183200   18.2300  143.5200      17.7       162       238        90
WVCT   2025250    183200   18.2500  143.4300      15.1       162       256        83
WVCT   2025250    183200   18.2100  143.3100      10.7       166       263        89
WVCT   2025250    183200   18.1900  143.2100       8.7       176       265        85
WVCT   2025250    183200   18.2100  143.1300       9.1       179       272        76
WVCT   2025250    183200   18.2300  143.0600       8.6       182       273        75
WVCT   2025250    183200   18.1900  142.8800       5.4       169       265        88
WVCT   2025250    183200   18.1700  142.8600       5.0       168       264        85
WVCT   2025250    183200   18.1700  146.4900       6.8        74       305        67
WVCT   2025250    183200   18.1100  146.4300       9.5        39       289        83
WVCT   2025250    183200   18.1100  146.3500      12.6        31       306        81
WVCT   2025250    183200   18.0900  146.1700       7.6        45       280        79
WVCT   2025250    183200   18.0900  146.1600       7.7        46       257        80
WVCT   2025250    183200   18.1700  146.0400       8.8        69       215        70
WVCT   2025250    183200   18.1100  145.9400      12.2        46       212        95
WVCT   2025250    183200   18.0900  145.8000      13.4        44       204        94
WVCT   2025250    183200   18.1300  145.6900      12.9        54       190        77
WVCT   2025250    183200   18.1300  145.6700      12.7        57       185        79
WVCT   2025250    183200   18.1100  145.5500      10.7        69       174        68
WVCT   2025250    183200   18.1300  145.4400       8.6        65       169        68
WVCT   2025250    183200   18.1200  145.3000       9.3        84       154        90
WVCT   2025250    183200   18.1200  145.2000      11.9       118       154        91
WVCT   2025250    183200   18.0800  145.1000      12.5       121       169        91
WVCT   2025250    183200   18.0800  145.0100       9.5       131       178        87
WVCT   2025250    183200   18.0800  144.9500       7.2       158       178        79
WVCT   2025250    183200   18.0800  144.8700       8.5       179       178        83
WVCT   2025250    183200   18.0800  144.7700      11.6       164       184        84
WVCT   2025250    183200   18.0800  144.6800      14.4       165       185        91
WVCT   2025250    183200   18.0800  144.6000      15.4       175       183        73
WVCT   2025250    183200   18.1600  144.4700      14.1       183       181        89
WVCT   2025250    183200   18.1200  144.3300      16.2       179       175        89
WVCT   2025250    183200   18.0800  144.3100      16.3       180       179        76
WVCT   2025250    183200   18.1000  144.1900      13.9       172       174        68
WVCT   2025250    183200   18.1300  144.1200      12.6       162       179        79
WVCT   2025250    183200   18.1500  144.0200      13.3       161       186        84
WVCT   2025250    183200   18.1500  143.8900      11.2       176       192        87
WVCT   2025250    183200   18.1500  143.7500      11.0       191       209        81
WVCT   2025250    183200   18.1100  143.7300      10.3       193       213        77
WVCT   2025250    183200   18.0700  143.5500       8.1       159       233        83
WVCT   2025250    183200   18.1500  143.5200      14.9       158       241        91
WVCT   2025250    183200   18.1100  143.4200      12.0       159       263        89
WVCT   2025250    183200   18.0900  143.2800       9.1       184       270        86
WVCT   2025250    183200   18.1100  143.1700       8.7       189       266        79
WVCT   2025250    183200   18.1300  143.1500       8.6       186       268        78
WVCT   2025250    183200   18.0700  143.0500       7.9       182       275        88
WVCT   2025250    183200   18.0900  142.9400       6.2       173       276        82
WVCT   2025250    183200   18.1100  142.8600       5.2       171       267        83
WVCT   2025250    183200   18.0900  142.5300       4.3       176       333        61
WVCT   2025250    183200   18.0600  146.5800       5.6        59       342        75
WVCT   2025250    183200   18.0000  146.4800       6.2        55       283        61
WVCT   2025250    183200   18.0000  146.4200       8.5        44       282        77
WVCT   2025250    183200   18.0000  146.3100      11.1        37       291        89
WVCT   2025250    183200   18.0300  146.1700      10.7        29       264        89
WVCT   2025250    183200   18.0700  146.1500       8.8        37       256        85
WVCT   2025250    183200   17.9900  146.0500      14.0        36       226        97
WVCT   2025250    183200   18.0300  145.9000      11.5        42       216        87
WVCT   2025250    183200   18.0700  145.7800      14.0        44       203        92
WVCT   2025250    183200   17.9900  145.7000      14.2        44       203        74
WVCT   2025250    183200   18.0500  145.5900      14.6        49       180        85
WVCT   2025250    183200   17.9900  145.5500      13.0        43       182        85
WVCT   2025250    183200   18.0100  145.4100      10.0        47       178        95
WVCT   2025250    183200   17.9900  145.3700       8.6        49       178        90
WVCT   2025250    183200   17.9900  145.2000       6.5       113       163        76
WVCT   2025250    183200   18.0200  145.1400       9.6       124       171        85
WVCT   2025250    183200   17.9800  145.0400       9.2       137       205        86
WVCT   2025250    183200   18.0400  144.9100       8.9       173       190        82
WVCT   2025250    183200   18.0400  144.8900       9.2       176       193        82
WVCT   2025250    183200   18.0600  144.7700      11.7       166       190        82
WVCT   2025250    183200   18.0200  144.6500      15.5       177       189        83
WVCT   2025250    183200   18.0600  144.6000      15.5       179       184        69
WVCT   2025250    183200   18.0000  144.5000      14.7       185       185        76
WVCT   2025250    183200   18.0600  144.3300      15.9       179       181        78
WVCT   2025250    183200   18.0400  144.3100      15.5       181       181        73
WVCT   2025250    183200   18.0600  144.2100      14.6       179       178        61
WVCT   2025250    183200   18.0200  144.0900      13.1       172       185        87
WVCT   2025250    183200   18.0200  144.0000      11.3       167       187        95
WVCT   2025250    183200   17.9800  143.9200      10.1       182       199        89
WVCT   2025250    183200   18.0100  143.7400      10.7       203       210        71
WVCT   2025250    183200   18.0500  143.7100      10.0       197       217        83
WVCT   2025250    183200   17.9700  143.5700       6.0       179       235        79
WVCT   2025250    183200   17.9700  143.5300       6.3       170       242        85
WVCT   2025250    183200   18.0500  143.3600       8.6       164       273        88
WVCT   2025250    183200   18.0500  143.2600       8.8       192       272        85
WVCT   2025250    183200   18.0300  143.2400       8.7       197       271        85
WVCT   2025250    183200   17.9700  143.0900       8.6       197       267        82
WVCT   2025250    183200   18.0300  143.0100       7.9       176       275        89
WVCT   2025250    183200   18.0500  142.9200       6.3       167       274        89
WVCT   2025250    183200   17.9700  142.8000       4.6       166       266        87
WVCT   2025250    183200   17.9600  146.4800       6.4        53       283        63
WVCT   2025250    183200   17.9400  146.3800       9.0        45       283        84
WVCT   2025250    183200   17.9700  146.2100      11.4        32       274        82
WVCT   2025250    183200   17.9700  146.1100      13.5        32       240        95
WVCT   2025250    183200   17.8900  146.0700      13.0        34       247        95
WVCT   2025250    183200   17.8900  145.9100      13.3        44       230        94
WVCT   2025250    183200   17.9500  145.8900      11.6        43       220        84
WVCT   2025250    183200   17.8900  145.7100      14.4        40       206        84
WVCT   2025250    183200   17.9500  145.6200      13.2        43       200        77
WVCT   2025250    183200   17.9700  145.5400      12.5        41       184        84
WVCT   2025250    183200   17.9300  145.4400       9.2        38       182        96
WVCT   2025250    183200   17.8900  145.4000       7.2        34       183        92
WVCT   2025250    183200   17.8900  145.2700       4.2        49       182        63
WVCT   2025250    183200   17.9100  145.1100       4.4       135       198        84
WVCT   2025250    183200   17.8900  144.9600       7.1       164       235        83
WVCT   2025250    183200   17.8900  144.9200       7.8       172       223        77
WVCT   2025250    183200   17.9200  144.7500      14.1       177       194        73
WVCT   2025250    183200   17.9200  144.7300      14.8       177       191        73
WVCT   2025250    183200   17.8800  144.4500      13.1       193       193        85
WVCT   2025250    183200   17.8800  144.3600      13.5       189       186        88
WVCT   2025250    183200   17.9600  144.3000      13.7       183       183        73
WVCT   2025250    183200   17.9200  144.2000      14.3       188       184        68
WVCT   2025250    183200   17.9600  144.1300      13.3       177       186        75
WVCT   2025250    183200   17.9200  143.9700       7.1       171       189        87
WVCT   2025250    183200   17.8800  143.9100       8.1       184       204        81
WVCT   2025250    183200   17.9400  143.8000      10.1       199       209        60
WVCT   2025250    183200   17.9600  143.6600       6.7       194       226        61
WVCT   2025250    183200   17.9500  143.5100       6.7       167       245        86
WVCT   2025250    183200   17.8800  143.4700       8.5       175       260        71
WVCT   2025250    183200   17.9100  143.3100       6.5       179       273        72
WVCT   2025250    183200   17.8700  143.2600       6.4       193       276        70
WVCT   2025250    183200   17.8900  143.1000       7.1       199       268        71
WVCT   2025250    183200   17.8700  143.0000       7.2       177       272        87
WVCT   2025250    183200   17.8700  142.9900       7.3       175       275        88
WVCT   2025250    183200   17.9300  142.8300       6.1       165       274        89
WVCT   2025250    183200   17.9500  142.7800       4.5       166       263        86
WVCT   2025250    183200   17.8800  146.5100       7.4        46       310        89
WVCT   2025250    183200   17.8800  146.4700       6.8        53       285        69
WVCT   2025250    183200   17.8200  146.3700       8.2        52       278        71
WVCT   2025250    183200   17.8600  146.2800       9.3        46       281        76
WVCT   2025250    183200   17.8000  146.1800      11.4        38       272        92
WVCT   2025250    183200   17.8800  146.0600      13.0        35       251        94
WVCT   2025250    183200   17.8700  145.9100      13.8        43       234        94
WVCT   2025250    183200   17.8300  145.8300      14.5        38       224        98
WVCT   2025250    183200   17.7900  145.7700      14.0        41       218        93
WVCT   2025250    183200   17.7900  145.6500      12.4        39       205        77
WVCT   2025250    183200   17.8700  145.5800      11.1        36       201        83
WVCT   2025250    183200   17.8700  145.5000       9.1        31       188        89
WVCT   2025250    183200   17.8100  145.3800       5.4        21       188        90
WVCT   2025250    183200   17.8700  144.9800       6.4       166       232        84
WVCT   2025250    183200   17.7900  144.8900       6.3       200       197        67
WVCT   2025250    183200   17.8300  144.8200       8.6       187       191        62
WVCT   2025250    183200   17.8100  144.6800      12.6       196       182        73
WVCT   2025250    183200   17.8600  144.4500      13.5       193       195        82
WVCT   2025250    183200   17.7800  144.3700      14.0       193       191        72
WVCT   2025250    183200   17.8600  144.3200      14.5       186       185        85
WVCT   2025250    183200   17.8200  144.2000      12.0       183       185        83
WVCT   2025250    183200   17.7800  144.0800       9.1       168       188        63
WVCT   2025250    183200   17.7800  143.9600       8.4       166       199        78
WVCT   2025250    183200   17.8200  143.9500       7.9       171       199        85
WVCT   2025250    183200   17.8200  143.7900      10.2       192       213        69
WVCT   2025250    183200   17.8600  143.5000       7.9       179       253        70
WVCT   2025250    183200   17.8600  143.4500       8.5       178       261        74
WVCT   2025250    183200   17.8200  143.2900       6.4       179       274        60
WVCT   2025250    183200   17.8500  143.2300       6.3       192       276        65
WVCT   2025250    183200   17.8300  143.0000       6.5       178       269        69
WVCT   2025250    183200   17.8300  142.9800       6.5       177       272        71
WVCT   2025250    183200   17.8500  142.8900       7.2       166       281        72
WVCT   2025250    183200   17.7200  146.4800       7.4        45       341        83
WVCT   2025250    183200   17.7000  146.3800       8.5        51       289        67
WVCT   2025250    183200   17.7600  146.2500      11.5        44       274        90
WVCT   2025250    183200   17.7800  146.1600      12.1        37       270        93
WVCT   2025250    183200   17.7000  146.1100      14.1        37       256        90
WVCT   2025250    183200   17.7400  146.0000      13.1        42       256        89
WVCT   2025250    183200   17.7000  145.9000      13.5        46       252        87
WVCT   2025250    183200   17.7600  145.8200      14.2        44       238        91
WVCT   2025250    183200   17.7700  145.6700      12.4        36       206        80
WVCT   2025250    183200   17.7100  145.6300      10.6        39       205        70
WVCT   2025250    183200   17.6900  145.4700       6.4        23       188        85
WVCT   2025250    183200   17.6900  145.4500       5.8        18       186        86
WVCT   2025250    183200   17.7500  145.0100       5.6       209       189        69
WVCT   2025250    183200   17.7300  144.9700       6.5       213       185        73
WVCT   2025250    183200   17.7700  144.8100       7.0       202       184        67
WVCT   2025250    183200   17.7500  144.7000       9.7       202       182        79
WVCT   2025250    183200   17.7700  144.5600      11.3       204       196        60
WVCT   2025250    183200   17.7400  144.3500      13.7       191       189        67
WVCT   2025250    183200   17.6800  144.1100       8.8       155       197        79
WVCT   2025250    183200   17.6800  144.0400       9.2       161       205        67
WVCT   2025250    183200   17.7400  143.9800       9.3       166       203        77
WVCT   2025250    183200   17.7400  143.8500      10.8       187       212        79
WVCT   2025250    183200   17.7200  143.7700       9.4       186       219        88
WVCT   2025250    183200   17.7600  143.6700       7.4       181       227        66
WVCT   2025250    183200   17.6800  143.6100       6.2       172       237        80
WVCT   2025250    183200   17.7200  143.4800       5.3       189       259        65
WVCT   2025250    183200   17.6800  143.3600       4.5       176       262        62
WVCT   2025250    183200   17.7600  143.3300       6.2       175       267        65
WVCT   2025250    183200   17.7000  143.1500       7.1       175       273        60
WVCT   2025250    183200   17.6800  146.4600       7.3        47       320        82
WVCT   2025250    183200   17.6000  146.3200       9.0        45       289        81
WVCT   2025250    183200   17.6200  146.3000       9.8        45       281        83
WVCT   2025250    183200   17.6400  146.1900      14.3        43       259        88
WVCT   2025250    183200   17.6000  146.1100      15.0        41       251        89
WVCT   2025250    183200   17.6200  145.9900      13.7        40       258        89
WVCT   2025250    183200   17.6800  145.8600      13.6        43       249        88
WVCT   2025250    183200   17.6200  145.8000      14.0        41       247        89
WVCT   2025250    183200   17.6400  145.6400       8.6        30       217        69
WVCT   2025250    183200   17.6100  145.3700       4.0         9       183        68
WVCT   2025250    183200   17.5900  145.1700       5.3       288       182        83
WVCT   2025250    183200   17.6300  145.0800       5.4       257       181        80
WVCT   2025250    183200   17.6300  145.0400       5.6       247       182        78
WVCT   2025250    183200   17.6100  144.8500       5.6       221       186        66
WVCT   2025250    183200   17.6500  144.7300       5.8       200       189        71
WVCT   2025250    183200   17.6300  144.1500       8.6       154       206        67
WVCT   2025250    183200   17.6600  144.0000      10.4       173       209        66
WVCT   2025250    183200   17.6000  143.9000      11.5       181       211        76
WVCT   2025250    183200   17.6000  143.8600      10.6       182       213        72
WVCT   2025250    183200   17.6000  143.7300       6.1       171       229        83
WVCT   2025250    183200   17.5800  143.6100       5.4       170       243        77
WVCT   2025250    183200   17.6600  143.5900       5.9       173       240        80
WVCT   2025250    183200   17.5800  143.3400       4.4       167       265        63
WVCT   2025250    183200   17.5800  143.1500       9.4       174       271        88
WVCT   2025250    183200   17.6200  143.0300       8.7       164       260        84
WVCT   2025250    183200   17.6400  143.0100       8.3       164       257        77
WVCT   2025250    183200   17.5800  142.9200       5.5       160       257        78
WVCT   2025250    183200   17.5500  146.4100       6.5        42       337        73
WVCT   2025250    183200   17.5600  146.4000       7.0        42       320        72
WVCT   2025250    183200   17.5400  146.2800       8.3        41       291        73
WVCT   2025250    183200   17.5400  146.1600      13.0        41       269        87
WVCT   2025250    183200   17.5600  146.0300      14.2        37       252        89
WVCT   2025250    183200   17.5800  145.9300      14.2        42       263        88
WVCT   2025250    183200   17.5200  145.8700      14.1        40       265        88
WVCT   2025250    183200   17.5600  145.7300      12.0        35       243        86
WVCT   2025250    183200   17.5400  145.7100      11.4        35       239        85
WVCT   2025250    183200   17.5500  145.2300       4.5       304       185        62
WVCT   2025250    183200   17.5300  144.0500       9.7       195       211        79
WVCT   2025250    183200   17.4900  143.9300      10.4       183       212        92
WVCT   2025250    183200   17.5500  143.8400       9.7       180       218        70
WVCT   2025250    183200   17.4900  143.7400       6.0       177       242        72
WVCT   2025250    183200   17.5000  143.6400       4.4       164       249        85
WVCT   2025250    183200   17.5600  143.5100       4.2       189       258        67
WVCT   2025250    183200   17.5600  143.3400       4.9       170       266        60
WVCT   2025250    183200   17.4800  143.2800       7.9       167       270        86
WVCT   2025250    183200   17.5400  143.1500      10.1       172       273        92
WVCT   2025250    183200   17.4800  143.0500      10.2       161       271        86
WVCT   2025250    183200   17.5200  142.9500       7.1       153       267        89
WVCT   2025250    183200   17.4100  146.3500       7.5        34       337        62
WVCT   2025250    183200   17.4100  146.2300       6.0        28       304        79
WVCT   2025250    183200   17.4100  146.0900       9.8        34       265        77
WVCT   2025250    183200   17.4800  146.0400      14.4        39       258        87
WVCT   2025250    183200   17.4000  145.9000       9.9        27       255        76
WVCT   2025250    183200   17.4800  145.8300      13.6        38       254        88
WVCT   2025250    183200   17.4400  145.7700      12.6        42       247        87
WVCT   2025250    183200   17.4600  145.6700      12.2        48       241        84
WVCT   2025250    183200   17.4000  145.5300       7.0        32       234        83
WVCT   2025250    183200   17.4500  144.5700       5.7       296       210        63
WVCT   2025250    183200   17.4700  144.5100       5.0       292       202        62
WVCT   2025250    183200   17.4100  144.0400      10.0       190       216        89
WVCT   2025250    183200   17.4100  143.9700       8.8       174       220        86
WVCT   2025250    183200   17.4500  143.9300       9.7       181       216        91
WVCT   2025250    183200   17.4100  143.7600       8.6       192       252        84
WVCT   2025250    183200   17.3900  143.2700       7.3       164       268        73
WVCT   2025250    183200   17.3900  143.2300       8.5       163       265        91
WVCT   2025250    183200   17.3800  143.0800       8.6       157       273        93
WVCT   2025250    183200   17.4400  143.0500      10.1       161       272        88
WVCT   2025250    183200   17.4600  142.9100       7.1       155       274        63
WVCT   2025250    183200   17.3900  146.3300       7.3        34       335        63
WVCT   2025250    183200   17.3300  146.2100       4.7        20       298        63
WVCT   2025250    183200   17.3500  146.1900       5.2        23       282        65
WVCT   2025250    183200   17.3900  146.0900       9.0        31       265        74
WVCT   2025250    183200   17.3700  145.9900       9.1        27       265        86
WVCT   2025250    183200   17.3600  145.7200       9.2        38       242        68
WVCT   2025250    183200   17.3400  145.6800       9.2        45       237        70
WVCT   2025250    183200   17.3800  145.5900       9.5        47       236        81
WVCT   2025250    183200   17.3800  145.4300       4.7       346       236        64
WVCT   2025250    183200   17.3000  145.0800       6.9       288       236        73
WVCT   2025250    183200   17.3200  144.9100       8.2       289       231        62
WVCT   2025250    183200   17.3000  144.6700       8.9       303       220        74
WVCT   2025250    183200   17.3200  144.6400       8.5       303       216        67
WVCT   2025250    183200   17.2900  144.2300       8.8       215       229        69
WVCT   2025250    183200   17.3700  144.1400      12.9       202       223        83
WVCT   2025250    183200   17.3700  143.9800       9.7       167       227        73
WVCT   2025250    183200   17.3700  143.9700       9.5       168       229        74
WVCT   2025250    183200   17.2900  143.8300      12.3       193       255        82
WVCT   2025250    183200   17.2900  143.7100       9.3       197       278        65
WVCT   2025250    183200   17.2900  143.4600       6.3       161       293        75
WVCT   2025250    183200   17.3500  143.3100       7.0       167       270        63
WVCT   2025250    183200   17.3300  143.2100       6.9       161       263        89
WVCT   2025250    183200   17.3300  143.1400       6.8       156       263        89
WVCT   2025250    183200   17.3600  143.1000       7.7       157       272        92
WVCT   2025250    183200   17.3200  142.9300       6.3       155       292        86
WVCT   2025250    183200   17.3600  142.9100       7.0       154       293        85
WVCT   2025250    183200   17.3600  142.8100       6.1       161       289        87
WVCT   2025250    183200   17.2300  146.2600       4.3        11       325        68
WVCT   2025250    183200   17.2300  146.1600       4.0       356       255        63
WVCT   2025250    183200   17.2500  146.1400       4.3         4       253        66
WVCT   2025250    183200   17.2500  145.9500       6.5       350       258        73
WVCT   2025250    183200   17.2100  145.7900       8.7       318       243        83
WVCT   2025250    183200   17.2700  145.7200       6.1       347       238        66
WVCT   2025250    183200   17.2100  145.6600       5.5       326       235        66
WVCT   2025250    183200   17.2800  145.5100       7.0         6       235        60
WVCT   2025250    183200   17.2800  145.4500       6.3       351       238        65
WVCT   2025250    183200   17.2400  145.2900       6.4       303       239        81
WVCT   2025250    183200   17.2600  145.1900       7.2       294       237        65
WVCT   2025250    183200   17.2200  145.1300       8.6       287       233        88
WVCT   2025250    183200   17.2600  145.0400       7.4       284       234        79
WVCT   2025250    183200   17.2200  144.9400       8.4       273       236        79
WVCT   2025250    183200   17.2800  144.8300       9.1       290       229        80
WVCT   2025250    183200   17.2200  144.7100       8.1       299       228        82
WVCT   2025250    183200   17.2000  144.6100       5.3       296       229        60
WVCT   2025250    183200   17.2000  144.2300       7.2       189       238        85
WVCT   2025250    183200   17.2300  144.1300      10.9       179       238        90
WVCT   2025250    183200   17.2300  144.0900      11.5       171       239        83
WVCT   2025250    183200   17.2700  144.0000      11.7       160       240        72
WVCT   2025250    183200   17.2500  143.8400      12.0       189       261        70
WVCT   2025250    183200   17.2100  143.8000      12.0       189       278        81
WVCT   2025250    183200   17.1900  143.7300      10.1       182       302        66
WVCT   2025250    183200   17.2500  143.4600       6.8       158       288        87
WVCT   2025250    183200   17.2300  143.3800       6.7       162       274        83
WVCT   2025250    183200   17.2100  143.2900       4.8       164       263        66
WVCT   2025250    183200   17.2500  142.9800       5.0       151       277        76
WVCT   2025250    183200   17.1900  146.2200       4.0       354       270        69
WVCT   2025250    183200   17.1300  145.9600       5.2       353       246        77
WVCT   2025250    183200   17.1100  145.9200       5.5       346       245        80
WVCT   2025250    183200   17.1100  145.7900       6.8       320       243        78
WVCT   2025250    183200   17.1100  145.7300       6.7       315       243        76
WVCT   2025250    183200   17.1500  145.5600       7.5       314       235        88
WVCT   2025250    183200   17.1300  145.5200       8.1       312       236        84
WVCT   2025250    183200   17.1300  145.4200       7.9       310       238        71
WVCT   2025250    183200   17.1100  145.3000      10.5       296       241        89
WVCT   2025250    183200   17.1600  145.1900      10.6       288       235        90
WVCT   2025250    183200   17.1000  145.0700       8.6       278       242        61
WVCT   2025250    183200   17.1600  144.9600       8.0       265       243        71
WVCT   2025250    183200   17.1200  144.8000       7.7       276       247        86
WVCT   2025250    183200   17.1000  144.7400       6.6       287       248        84
WVCT   2025250    183200   17.1200  144.4000       5.2       224       239        81
WVCT   2025250    183200   17.1000  144.3000       6.5       194       237        81
WVCT   2025250    183200   17.1200  144.2200       6.8       182       241        88
WVCT   2025250    183200   17.1200  144.1300       6.6       180       245        89
WVCT   2025250    183200   17.1600  144.0500       9.6       168       247        85
WVCT   2025250    183200   17.1000  143.9100      11.0       193       281        91
WVCT   2025250    183200   17.1000  143.8200      10.4       187       308        71
WVCT   2025250    183200   17.1700  143.7400      10.6       182       307        72
WVCT   2025250    183200   17.1700  143.7100       9.1       175       310        69
WVCT   2025250    183200   17.1700  143.6100       6.2       164       303        66
WVCT   2025250    183200   17.1300  143.4900       6.7       152       280        87
WVCT   2025250    183200   17.1100  143.3600       5.7       154       255        69
WVCT   2025250    183200   17.0900  143.2800       6.6       154       252        89
WVCT   2025250    183200   17.0300  145.8800       5.2       351       269        67
WVCT   2025250    183200   17.0100  145.7800       5.0       339       266        84
WVCT   2025250    183200   17.0100  145.6100       8.4       310       253        86
WVCT   2025250    183200   17.0300  145.5900       8.8       311       249        86
WVCT   2025250    183200   17.0100  145.4300       9.8       304       244        84
WVCT   2025250    183200   17.0100  145.3200       9.9       297       250        83
WVCT   2025250    183200   17.0100  145.3000      10.2       295       255        83
WVCT   2025250    183200   17.0700  145.1800      11.0       288       246        87
WVCT   2025250    183200   17.0900  145.0900       9.1       280       246        73
WVCT   2025250    183200   17.0800  144.8800       7.9       259       254        76
WVCT   2025250    183200   17.0800  144.7800       6.1       278       252        82
WVCT   2025250    183200   17.0000  144.7200       4.4       287       254        78
WVCT   2025250    183200   17.0600  144.4500       4.7       223       242        61
WVCT   2025250    183200   17.0000  144.4100       5.9       211       237        61
WVCT   2025250    183200   17.0400  144.2600       5.4       195       237        82
WVCT   2025250    183200   17.0400  144.0700       6.6       193       245        63
WVCT   2025250    183200   17.0200  143.9900       9.4       196       256        80
WVCT   2025250    183200   17.0800  143.9100      11.2       194       286        92
WVCT   2025250    183200   17.0800  143.8600      10.9       193       299        84
WVCT   2025250    183200   17.0200  143.6000       7.5       141       284        64
WVCT   2025250    183200   17.0200  143.5700       7.6       140       275        79
WVCT   2025250    183200   17.0400  143.3900       6.6       149       249        73
WVCT   2025250    183200   17.0200  143.3000       8.9       154       248        86
WVCT   2025250    183200   17.0000  143.2000       8.3       155       255        62
WVCT   2025250    183200   17.0100  142.6500       7.6       162       297        69
WVCT   2025250    183200   16.9300  145.7000       4.4       355       298        69
WVCT   2025250    183200   16.9700  145.5800       8.4       304       259        88
WVCT   2025250    183200   16.9300  145.4900       9.1       297       251        85
WVCT   2025250    183200   16.9100  145.3900       7.6       301       256        67
WVCT   2025250    183200   16.9700  145.3500       9.2       303       252        76
WVCT   2025250    183200   16.9300  145.2000       8.7       286       271        78
WVCT   2025250    183200   16.9300  145.1800       8.5       286       272        80
WVCT   2025250    183200   16.9100  145.0200       4.5       287       274        66
WVCT   2025250    183200   16.9100  144.8100       4.9       287       254        76
WVCT   2025250    183200   16.9300  144.7900       5.0       288       258        84
WVCT   2025250    183200   16.9600  144.0400       6.7       199       243        71
WVCT   2025250    183200   16.9600  143.9500      10.2       198       285        90
WVCT   2025250    183200   16.9400  143.9300      10.4       197       294        84
WVCT   2025250    183200   16.9000  143.5600       6.2       137       263        87
WVCT   2025250    183200   16.9200  143.5400       6.5       137       262        87
WVCT   2025250    183200   16.9600  143.4300       6.9       143       247        82
WVCT   2025250    183200   16.9800  143.3100       9.8       153       247        92
WVCT   2025250    183200   16.9800  143.2000       8.4       154       256        63
WVCT   2025250    183200   16.9300  142.6600       7.1       156       269        78
WVCT   2025250    183200   16.9700  142.6400       7.4       158       292        75
WVCT   2025250    183200   16.8400  145.5400       5.1       290       307        76
WVCT   2025250    183200   16.8500  145.4400       6.3       294       268        61
WVCT   2025250    183200   16.8700  145.4200       6.7       297       262        60
WVCT   2025250    183200   16.8700  145.1900       6.6       287       283        71
WVCT   2025250    183200   16.8300  145.1300       5.3       299       294        61
WVCT   2025250    183200   16.8900  144.7900       4.6       287       251        77
WVCT   2025250    183200   16.8100  144.7100       4.3       272       263        78
WVCT   2025250    183200   16.8800  144.0600       5.7       198       251        86
WVCT   2025250    183200   16.8800  143.9400       8.8       198       307        70
WVCT   2025250    183200   16.8200  143.6900       4.0       134       288        71
WVCT   2025250    183200   16.8400  143.5200       5.4       146       248        80
WVCT   2025250    183200   16.8400  143.4800       6.2       148       244        87
WVCT   2025250    183200   16.8400  143.4000       8.9       146       246        91
WVCT   2025250    183200   16.8000  143.2700       9.1       148       259        68
WVCT   2025250    183200   16.8800  142.6800       6.0       153       259        93
WVCT   2025250    183200   16.7900  144.7300       4.3       268       270        74
WVCT   2025250    183200   16.7900  144.7100       4.3       268       270        77
WVCT   2025250    183200   16.7100  143.6700       4.1       141       253        86
WVCT   2025250    183200   16.7800  143.5200       4.6       156       247        73
WVCT   2025250    183200   16.7200  143.3800      10.0       148       255        85
WVCT   2025250    183200   16.7400  143.3600      10.4       147       254        84
WVCT   2025250    183200   16.7800  143.2500       7.8       150       262        66
WVCT   2025250    183200   16.7000  143.1100       4.8       166       259        81
WVCT   2025250    183200   16.7200  142.8600       4.5       145       242        78
WVCT   2025250    183200   16.7200  142.7900       6.2       149       253        93
WVCT   2025250    183200   16.7800  142.6900       4.9       146       258        92
WVCT   2025250    183200   16.6200  145.1400       4.2       259       339        78
WVCT   2025250    183200   16.6300  143.8200       4.5       149       289        85
WVCT   2025250    183200   16.6500  143.7400       4.1       144       260        85
WVCT   2025250    183200   16.6900  143.6700       4.3       142       250        83
WVCT   2025250    183200   16.6100  143.5300       7.2       141       237        93
WVCT   2025250    183200   16.6100  143.4500       8.9       141       254        80
WVCT   2025250    183200   16.6800  143.3200       8.9       146       264        81
WVCT   2025250    183200   16.6100  143.2600       5.7       150       253        66
WVCT   2025250    183200   16.6100  143.1800       4.6       161       240        63
WVCT   2025250    183200   16.6400  143.0500       5.1       154       234        62
WVCT   2025250    183200   16.6200  142.9200       6.8       142       223        98
WVCT   2025250    183200   16.6200  142.8600       7.7       144       233        96
WVCT   2025250    183200   16.6800  142.7300       5.7       144       258        92
WVCT   2025250    183200   16.6000  145.1200       4.0       256       343        74
WVCT   2025250    183200   16.5600  144.5200       4.8       204       307        85
WVCT   2025250    183200   16.5100  143.8700       4.3       147       271        77
WVCT   2025250    183200   16.5100  143.8300       4.4       147       239        87
WVCT   2025250    183200   16.5900  143.7600       4.2       144       231        83
WVCT   2025250    183200   16.5700  143.5900       6.1       140       229        69
WVCT   2025250    183200   16.5300  143.5500       7.9       141       232        68
WVCT   2025250    183200   16.5900  143.4700       8.9       140       249        78
WVCT   2025250    183200   16.5900  143.3800       8.9       141       262        85
WVCT   2025250    183200   16.5100  143.2800       4.5       130       233        72
WVCT   2025250    183200   16.5100  143.1000       4.3       130       224        86
WVCT   2025250    183200   16.5100  143.0300       4.9       122       213        86
WVCT   2025250    183200   16.5500  142.9700       5.5       126       212        93
WVCT   2025250    183200   16.5500  142.9000       5.8       129       218        97
WVCT   2025250    183200   16.4800  143.8900       4.0       144       264        81
WVCT   2025250    183200   16.4900  143.5600       6.9       142       230        61
WVCT   2025250    183200   16.4700  143.4700       5.7       143       246        60
WVCT   2025250    183200   16.4900  143.2800       4.2       127       228        71
WVCT   2025250    183200   16.4900  143.0300       4.5       117       213        85
WVCT   2025250    183200   15.7600  143.5300       4.4       131       208        82
WVCT   2025250    183200   15.7600  143.3800       4.2       122       191        73
WVCT   2025250    183200   15.6600  143.6100       5.9       150       230        69
WVCT   2025250    183200   15.6600  143.5300       6.0       141       204        69
WVCT   2025250    183200   15.7200  143.4200       4.4       130       192        69
WVCT   2025250    183200   15.5500  143.6600       5.6       146       226        91
WVCT   2025250    183200   15.5700  143.6400       6.1       148       226        88
WVCT   2025250    183200   15.5700  143.5300       4.3       118       192        85
WVCT   2025250    183200   15.4500  143.7300       6.6       142       203        76
WVCT   2025250    183200   15.4500  143.7100       6.4       141       203        80
WVCT   2025250    183200   15.3600  144.3600       4.2       140       286        79
WVCT   2025250    183200   15.3600  144.3400       4.6       140       281        79
WVCT   2025250    183200   15.3700  143.7900       6.4       136       225        73
WVCT   2025250    183200   15.3900  143.7100       4.9       129       225        93
WVCT   2025250    183200   15.4300  143.3500       6.3        75       199        65
WVCT   2025250    183200   15.3000  143.8400       6.2       149       222        64
WVCT   2025250    183200   15.3400  143.8200       6.5       142       222        62
WVCT   2025250    183200   15.2200  144.2200       5.2       127       223        85
WVCT   2025250    183200   15.2400  143.9100       5.7       145       222        67
WVCT   2025250    183200   15.0100  143.6600       5.3        78       188        73
WVCT   2025250    183200   15.0300  143.6000       6.9        67       186        65
WVCT   2025250    183200   14.9200  144.1900       4.9        77       169        63
WVCT   2025250    183200   14.9500  143.6200       6.1        76       187        78
WVCT   2025250    183200   14.8000  143.5200       9.3        57       304        67
WVCT   2025250    183200   14.6800  142.6400       6.1        68       250        85
WVCT   2025250    183200   14.6600  142.6600       6.1        67       250        82
WVCT   2025250    183200   14.5800  142.5300       9.2        51       229        80
VIS    2025250    183200   24.1200  152.0700       7.9        98       892        96
VIS    2025250    183200   24.0900  150.2400       9.2       115       939        90
VIS    2025250    183200   24.1100  150.1400       9.3       110       975        90
VIS    2025250    183200   24.0900  150.1200       9.4       107       992        91
VIS    2025250    183200   24.0800  149.8100       8.7       102       982        96
VIS    2025250    183200   24.0800  149.8000       8.6       101       982        97
VIS    2025250    183200   24.0800  149.7000       9.6       115       933        97
VIS    2025250    183200   24.1000  149.7000       9.8       118       916        98
VIS    2025250    183200   24.0900  149.6500       9.1       104       942        96
VIS    2025250    183200   24.1000  149.6400       8.8       108       927        98
VIS    2025250    183200   24.0800  149.6100       8.8       108       885        93
VIS    2025250    183200   24.1000  149.4800       9.2       119       889        94
VIS    2025250    183200   24.0900  149.4000       7.0       106       957        99
VIS    2025250    183200   24.0800  149.3400       8.9       112       896        90
VIS    2025250    183200   24.0900  149.2900       8.7       116       912        91
VIS    2025250    183200   24.0900  149.1300       9.9       127       793        90
VIS    2025250    183200   24.0700  148.9200       6.7       110       925        95
VIS    2025250    183200   24.0900  148.9000       7.1       104       936        96
VIS    2025250    183200   24.0800  148.8700       7.7       106       934        95
VIS    2025250    183200   24.0800  148.8200       7.6       116       809        90
VIS    2025250    183200   24.0400  146.9100       9.1        89       989        98
VIS    2025250    183200   24.0500  146.8700       9.1        88       990        98
VIS    2025250    183200   24.0400  146.8300       9.6        92       985        99
VIS    2025250    183200   24.0400  146.8000       9.7        92       985        97
VIS    2025250    183200   24.0400  146.8000       9.7        92       985        97
VIS    2025250    183200   24.0500  146.7500       9.5        90       981        95
VIS    2025250    183200   24.0500  146.7500       9.4        90       980        95
VIS    2025250    183200   24.0500  146.7000       9.2        93       981        94
VIS    2025250    183200   24.0500  146.6800       9.3        95       981        95
VIS    2025250    183200   24.0600  146.6500       9.5        98       972        99
VIS    2025250    183200   24.0400  146.6300       9.3        99       953        99
VIS    2025250    183200   24.0400  146.6200       9.2       100       954        98
VIS    2025250    183200   24.0600  146.5800       9.4        97       957        99
VIS    2025250    183200   24.0400  146.5600       9.0        97       953        98
VIS    2025250    183200   24.0400  146.5200       9.0        97       947        99
VIS    2025250    183200   24.0300  146.5100       8.9        97       941        99
VIS    2025250    183200   24.0400  146.4800       8.9        96       938        98
VIS    2025250    183200   24.0300  146.4500       8.7        95       909        98
VIS    2025250    183200   24.0400  146.4400       8.5        97       908        98
VIS    2025250    183200   24.0500  146.4000       8.7       103       920        98
VIS    2025250    183200   24.0300  146.3900       8.7       102       920        99
VIS    2025250    183200   24.0300  146.3600       9.1        98       921        98
VIS    2025250    183200   24.0500  146.3300       9.4        97       943        99
VIS    2025250    183200   24.0300  146.3100       9.3        98       947       100
VIS    2025250    183200   24.0300  145.6800      10.4        91       989        98
VIS    2025250    183200   24.0400  145.6400       9.2        95       987        99
VIS    2025250    183200   24.0300  145.6200       9.2        97       977        99
VIS    2025250    183200   24.0300  145.6100       9.2        97       969        99
VIS    2025250    183200   24.0300  145.5600       8.9        97       959        99
VIS    2025250    183200   24.0300  145.5500       8.7        95       959        99
VIS    2025250    183200   24.0200  145.5300       8.6        94       941        99
VIS    2025250    183200   24.0300  145.3500       9.8        92       989        95
VIS    2025250    183200   24.0300  145.3200      10.3        88       984        93
VIS    2025250    183200   24.0400  145.2300      10.6        92       968        98
VIS    2025250    183200   24.0300  145.2000      10.8        98       962        96
VIS    2025250    183200   24.0200  145.1700      10.3        96       909        96
VIS    2025250    183200   24.0200  145.1700      10.3        95       909        97
VIS    2025250    183200   24.0200  145.1200       9.4        95       916        98
VIS    2025250    183200   24.0200  145.1100       9.3        95       916        98
VIS    2025250    183200   24.0200  143.4700      10.3        99       984        91
VIS    2025250    183200   24.1100  152.0700       8.3        95       889        95
VIS    2025250    183200   24.1100  152.0400       6.9       100       892        95
VIS    2025250    183200   24.1000  152.0200       6.0        98       938        97
VIS    2025250    183200   24.0900  152.0100       5.8        96       976        92
VIS    2025250    183200   24.0900  151.9500       7.5        88       989        90
VIS    2025250    183200   24.1100  151.8300       7.9        85       894        95
VIS    2025250    183200   24.1100  151.8300       7.8        85       901        95
VIS    2025250    183200   24.0700  150.5400       8.3       100       987        92
VIS    2025250    183200   24.0800  150.5100       7.5       106       970        94
VIS    2025250    183200   24.0800  150.5100       7.5       106       970        95
VIS    2025250    183200   24.0800  150.2300       9.3       114       939        90
VIS    2025250    183200   24.0800  150.1500       9.0       106       975        91
VIS    2025250    183200   24.0800  150.1100       9.4       108       991        91
VIS    2025250    183200   24.0600  150.0900       9.2       109       965        93
VIS    2025250    183200   24.0600  149.8100       9.0       104       969        94
VIS    2025250    183200   24.0500  149.8100       8.8       101       985        95
VIS    2025250    183200   24.0500  149.7700       8.7       107       966        95
VIS    2025250    183200   24.0500  149.7400       9.2       111       953        94
VIS    2025250    183200   24.0600  149.7200       9.1       113       934        97
VIS    2025250    183200   24.0500  149.7000       8.8       106       934        97
VIS    2025250    183200   24.0600  149.6800       9.1       103       945        95
VIS    2025250    183200   24.0700  149.6400       8.5        98       934        93
VIS    2025250    183200   24.0700  149.6300       8.4       100       929        93
VIS    2025250    183200   24.0600  149.4200       7.3       114       916        93
VIS    2025250    183200   24.0600  149.4000       7.5       113       901        94
VIS    2025250    183200   24.0500  149.3200       8.8       116       928        92
VIS    2025250    183200   24.0500  148.9300       6.9       115       884        95
VIS    2025250    183200   24.0500  148.9100       7.0       109       891        99
VIS    2025250    183200   24.0500  148.8800       8.0       109       850       100
VIS    2025250    183200   24.0200  146.8400       9.6        92       988        99
VIS    2025250    183200   24.0300  146.8200       9.7        93       961        98
VIS    2025250    183200   24.0100  146.7700       9.2        90       973        97
VIS    2025250    183200   24.0200  146.7200       9.3        92       968        95
VIS    2025250    183200   24.0200  146.7100       9.3        93       968        94
VIS    2025250    183200   24.0100  146.6800       9.3        96       968        97
VIS    2025250    183200   24.0100  146.6600       9.4        96       949        98
VIS    2025250    183200   24.0200  146.6200       9.2       100       939        98
VIS    2025250    183200   24.0100  146.6000       9.1       100       929        95
VIS    2025250    183200   24.0300  146.5900       9.2        98       954        95
VIS    2025250    183200   24.0300  146.5700       8.9        97       945        97
VIS    2025250    183200   24.0100  146.5300       8.7        98       941        97
VIS    2025250    183200   24.0100  146.5100       8.8        97       939        98
VIS    2025250    183200   24.0100  146.4900       8.9        97       932        99
VIS    2025250    183200   24.0100  146.4600       8.7        96       917        98
VIS    2025250    183200   24.0100  146.4200       8.5        98       908        99
VIS    2025250    183200   24.0200  146.3900       8.5       101       920        98
VIS    2025250    183200   24.0200  146.3800       8.4       101       934        98
VIS    2025250    183200   24.0200  146.3500       9.0        97       934        97
VIS    2025250    183200   24.0100  146.3100       9.0        96       938        99
VIS    2025250    183200   24.0100  145.6900      12.5        99       998        91
VIS    2025250    183200   24.0000  145.6500      10.0        95       984       100
VIS    2025250    183200   24.0000  145.6400       9.4        95       975       100
VIS    2025250    183200   24.0000  145.6000       8.8        93       931        99
VIS    2025250    183200   24.0000  145.5800       9.1        94       920        98
VIS    2025250    183200   24.0200  145.5500       8.9        95       941        98
VIS    2025250    183200   24.0100  145.5200       8.7        92       927        98
VIS    2025250    183200   24.0000  145.5200       8.7        91       927        98
VIS    2025250    183200   24.0000  145.2800       9.9        90       987        99
VIS    2025250    183200   24.0100  145.2000      10.4        95       961        94
VIS    2025250    183200   24.0100  145.1700      10.3        94       915        97
VIS    2025250    183200   24.0100  145.1600      10.3        95       909        98
VIS    2025250    183200   24.0000  145.1300       9.8        95       914        91
VIS    2025250    183200   24.0000  145.1200       9.5        95       916        93
VIS    2025250    183200   23.9800  142.5900      11.3        95       997        99
VIS    2025250    183200   23.9700  142.5600      11.9        97       992        98
VIS    2025250    183200   23.9900  142.5300      12.5        98       963        96
VIS    2025250    183200   24.0800  152.0700       8.7        93       871        92
VIS    2025250    183200   24.0700  152.0400       7.5        93       871        95
VIS    2025250    183200   24.0700  152.0200       6.8        92       944        90
VIS    2025250    183200   24.0900  151.8800       9.0        82       887        92
VIS    2025250    183200   24.0800  151.8100       7.4        89       831        97
VIS    2025250    183200   24.0700  151.7000       7.2        97       996        98
VIS    2025250    183200   24.0500  150.5400       7.7       104       970        98
VIS    2025250    183200   24.0500  150.5100       7.6       107       915        98
VIS    2025250    183200   24.0600  150.5100       7.7       107       928        98
VIS    2025250    183200   24.0400  150.4800       7.9       115       915        95
VIS    2025250    183200   24.0400  150.4300       8.6       108       982        94
VIS    2025250    183200   24.0400  150.4000       8.8       106       988        93
VIS    2025250    183200   24.0400  150.1200       8.5       103       967        96
VIS    2025250    183200   24.0300  150.1100       8.4       104       963        97
VIS    2025250    183200   24.0300  150.0700       8.8       104       938        95
VIS    2025250    183200   24.0500  149.8100       9.0       103       969        94
VIS    2025250    183200   24.0300  149.7800       8.5       107       966        96
VIS    2025250    183200   24.0300  149.7700       8.6       109       961        95
VIS    2025250    183200   24.0400  149.7400       9.0       110       950        96
VIS    2025250    183200   24.0300  149.7100       8.3       101       916        93
VIS    2025250    183200   24.0500  149.7000       8.7       104       937        96
VIS    2025250    183200   24.0400  149.4600       7.7       110       888        92
VIS    2025250    183200   24.0200  149.3500       8.3       116       919        94
VIS    2025250    183200   24.0300  149.3300       8.5       113       938        94
VIS    2025250    183200   24.0400  149.2700       7.8       122       925        91
VIS    2025250    183200   24.0200  149.1800       8.1       120       865        90
VIS    2025250    183200   24.0200  149.1500       7.7       121       795        95
VIS    2025250    183200   24.0300  148.9700       7.3       118       865        93
VIS    2025250    183200   24.0100  146.8300       9.7        93       961        96
VIS    2025250    183200   24.0000  146.8100       9.6        93       950        93
VIS    2025250    183200   24.0000  146.7700       9.2        91       973        96
VIS    2025250    183200   23.9900  146.7300       9.5        91       965        96
VIS    2025250    183200   23.9900  146.7100       9.4        94       968        96
VIS    2025250    183200   23.9900  146.6800       9.2        96       974        97
VIS    2025250    183200   23.9900  146.6500       9.2        95       949        99
VIS    2025250    183200   24.0000  146.6400       9.4        97       929        99
VIS    2025250    183200   24.0000  146.6100       9.2        99       929        96
VIS    2025250    183200   23.9900  146.5800       9.1        99       939        92
VIS    2025250    183200   24.0000  146.5500       8.5        97       941        93
VIS    2025250    183200   23.9900  146.5300       8.8        97       941        95
VIS    2025250    183200   23.9900  146.5000       9.2        96       939        99
VIS    2025250    183200   24.0000  146.4900       9.1        96       936        99
VIS    2025250    183200   24.0000  146.4600       8.9        96       918        99
VIS    2025250    183200   24.0000  146.3800       7.9        99       952        96
VIS    2025250    183200   24.0000  146.3600       8.3        99       952        95
VIS    2025250    183200   23.9800  146.3400       8.7        96       940        97
VIS    2025250    183200   23.9800  146.3000       8.3        90       931        97
VIS    2025250    183200   23.9800  145.6800      11.0        95       985        98
VIS    2025250    183200   23.9800  145.6700      10.9        95       985        98
VIS    2025250    183200   23.9900  145.6400       9.8        95       977       100
VIS    2025250    183200   23.9800  145.6100       8.8        92       927        99
VIS    2025250    183200   23.9800  145.5700       8.8        94       907        98
VIS    2025250    183200   23.9800  145.5700       8.9        95       907        97
VIS    2025250    183200   23.9800  145.5300       8.6        94       905        90
VIS    2025250    183200   23.9800  145.1800      10.1        90       937        94
VIS    2025250    183200   23.9700  145.1500       9.9        94       937        98
VIS    2025250    183200   23.9900  145.0300       9.9        92       995        95
VIS    2025250    183200   23.9500  143.5400      10.0        91       995        92
VIS    2025250    183200   23.9500  142.6200      12.1        98       995        96
VIS    2025250    183200   23.9600  142.5900      12.0        97       993        95
VIS    2025250    183200   23.9600  142.5800      11.9        97       993        95
VIS    2025250    183200   24.0600  152.0400       7.7        92       871        96
VIS    2025250    183200   24.0500  152.0400       7.5        90       917        91
VIS    2025250    183200   24.0500  151.9600       6.0        89       983        91
VIS    2025250    183200   24.0400  151.8900       9.1        80       903        90
VIS    2025250    183200   24.0400  151.8700       9.1        83       819        96
VIS    2025250    183200   24.0400  151.8300       8.6        82       809        92
VIS    2025250    183200   24.0600  151.8100       7.9        85       809        96
VIS    2025250    183200   24.0500  151.7000       7.1        93       996        98
VIS    2025250    183200   24.0200  150.5300       7.7       108       928        98
VIS    2025250    183200   24.0200  150.5100       7.6       110       876        97
VIS    2025250    183200   24.0300  150.4800       7.6       115       893        95
VIS    2025250    183200   24.0100  150.4600       8.0       117       914        92
VIS    2025250    183200   24.0100  150.4200       8.7       113       962        92
VIS    2025250    183200   24.0100  150.1400       9.2       107       954        93
VIS    2025250    183200   24.0300  150.1000       8.2       104       963        97
VIS    2025250    183200   24.0200  150.0900       8.1       106       949        97
VIS    2025250    183200   24.0100  150.0600       8.3       103       916        96
VIS    2025250    183200   24.0100  150.0300       8.7       112       929        92
VIS    2025250    183200   24.0200  149.8000       8.5       102       985        94
VIS    2025250    183200   24.0200  149.7700       8.7       111       961        94
VIS    2025250    183200   24.0000  149.7600       8.7       113       954        93
VIS    2025250    183200   24.0100  149.7100       8.2        99       920        90
VIS    2025250    183200   24.0100  149.3600       8.1       122       906        92
VIS    2025250    183200   24.0000  149.3000       7.6       110       917        91
VIS    2025250    183200   23.9900  149.2800       7.0       119       916        92
VIS    2025250    183200   24.0100  149.1500       7.6       115       832        95
VIS    2025250    183200   23.9900  149.1100       6.4       105       824        91
VIS    2025250    183200   24.0000  149.0900       7.4       106       797        92
VIS    2025250    183200   23.9700  146.9700       9.1        96       998        99
VIS    2025250    183200   23.9700  146.9600       9.1        96       998        99
VIS    2025250    183200   23.9700  146.9300       9.1        95       986        99
VIS    2025250    183200   23.9700  146.8700       9.2        95       997        99
VIS    2025250    183200   23.9700  146.8600       9.2        95       997       100
VIS    2025250    183200   23.9600  146.8300       9.2        94       992       100
VIS    2025250    183200   23.9600  146.8000       9.4        94       980        98
VIS    2025250    183200   23.9600  146.7700       9.3        93       979        94
VIS    2025250    183200   23.9700  146.7400       9.4        90       965        98
VIS    2025250    183200   23.9800  146.7100       9.4        93       968        96
VIS    2025250    183200   23.9600  146.6900       9.1        93       969        96
VIS    2025250    183200   23.9600  146.6800       9.1        95       969        96
VIS    2025250    183200   23.9700  146.6600       9.1        95       969        98
VIS    2025250    183200   23.9700  146.6100       9.4        98       929        97
VIS    2025250    183200   23.9800  146.6100       9.3        99       929        97
VIS    2025250    183200   23.9600  146.5800       9.0       102       929        95
VIS    2025250    183200   23.9600  146.5500       8.7       103       938        94
VIS    2025250    183200   23.9600  146.5300       9.0        99       941        97
VIS    2025250    183200   23.9700  146.4900       9.4        97       939        98
VIS    2025250    183200   23.9600  146.4700       9.0        98       939        97
VIS    2025250    183200   23.9700  146.4500       8.5        99       928        97
VIS    2025250    183200   23.9800  146.4000       7.9        97       954        90
VIS    2025250    183200   23.9700  146.3600       8.7        99       952        93
VIS    2025250    183200   23.9700  146.3300       8.9        94       938        98
VIS    2025250    183200   23.9700  146.3100       8.5        91       931        97
VIS    2025250    183200   23.9500  146.2900       8.0        89       949        95
VIS    2025250    183200   23.9700  146.2700       7.8        90       950        95
VIS    2025250    183200   23.9500  145.6800      10.1        94       980        98
VIS    2025250    183200   23.9600  145.6600      10.5        94       984        99
VIS    2025250    183200   23.9500  145.6400      10.3        94       952        99
VIS    2025250    183200   23.9500  145.6200      10.0        93       927       100
VIS    2025250    183200   23.9500  145.6000       9.7        93       905       100
VIS    2025250    183200   23.9400  145.5500       9.2        98       901        99
VIS    2025250    183200   23.9500  145.5400       8.7        97       901        95
VIS    2025250    183200   23.9500  145.1300       9.6        94       972        98
VIS    2025250    183200   23.9400  143.5300      10.0        92       995        94
VIS    2025250    183200   23.9500  143.5200      10.0        93       995        94
VIS    2025250    183200   23.9400  142.5900      12.1        97       992        94
VIS    2025250    183200   24.0300  151.8800       9.1        82       843        99
VIS    2025250    183200   24.0300  151.8300       8.6        83       809        91
VIS    2025250    183200   24.0300  151.8000       8.0        85       809        92
VIS    2025250    183200   24.0200  151.7000       7.0        93       969        95
VIS    2025250    183200   24.0200  151.6900       7.1        95       981        95
VIS    2025250    183200   24.0100  150.4600       8.3       117       914        91
VIS    2025250    183200   24.0000  150.4100       8.7       111       962        92
VIS    2025250    183200   23.9900  150.1500       9.6       109       954        91
VIS    2025250    183200   23.9900  150.1500       9.4       109       954        91
VIS    2025250    183200   23.9800  150.1000       8.1       113       949        95
VIS    2025250    183200   24.0000  150.0700       8.1       105       900        96
VIS    2025250    183200   24.0000  150.0600       8.0       104       900        96
VIS    2025250    183200   24.0000  150.0300       8.5       110       929        94
VIS    2025250    183200   24.0000  149.7800       8.4       109       966        93
VIS    2025250    183200   24.0000  149.7500       8.7       111       946        92
VIS    2025250    183200   24.0000  149.7300       8.5       105       920        91
VIS    2025250    183200   23.9800  149.3500       9.2       135       868        92
VIS    2025250    183200   23.9700  149.3200       9.0       129       874        96
VIS    2025250    183200   23.9900  149.2900       7.5       117       915        92
VIS    2025250    183200   23.9900  149.1100       6.1       102       870        92
VIS    2025250    183200   23.9900  149.0700       6.7       100       812        92
VIS    2025250    183200   23.9400  146.9900       9.8        96       994        97
VIS    2025250    183200   23.9400  146.9800       9.6        97       994        99
VIS    2025250    183200   23.9600  146.9400       8.9        95       986        99
VIS    2025250    183200   23.9600  146.9300       8.9        94       986       100
VIS    2025250    183200   23.9300  146.8900       9.0        94       986        99
VIS    2025250    183200   23.9300  146.8500       9.2        94       989       100
VIS    2025250    183200   23.9400  146.8300       9.2        92       992        99
VIS    2025250    183200   23.9500  146.8000       9.4        95       983        99
VIS    2025250    183200   23.9500  146.7900       9.4        95       979        99
VIS    2025250    183200   23.9500  146.7700       9.3        93       979        96
VIS    2025250    183200   23.9300  146.7300       9.1        92       949        98
VIS    2025250    183200   23.9300  146.7200       9.2        93       953        98
VIS    2025250    183200   23.9500  146.6800       9.1        94       968        96
VIS    2025250    183200   23.9500  146.6500       9.2        95       956        95
VIS    2025250    183200   23.9500  146.6500       9.2        96       955        94
VIS    2025250    183200   23.9400  146.6000       9.3       100       909        97
VIS    2025250    183200   23.9400  146.5900       9.2       101       909        97
VIS    2025250    183200   23.9400  146.5700       8.8       103       915        98
VIS    2025250    183200   23.9400  146.5400       8.8       102       938        97
VIS    2025250    183200   23.9500  146.5000       9.4        97       939        98
VIS    2025250    183200   23.9400  146.4800       9.1        98       937        97
VIS    2025250    183200   23.9500  146.4700       8.8        98       940        96
VIS    2025250    183200   23.9500  146.3400       9.3        92       956        96
VIS    2025250    183200   23.9400  146.3200       9.2        90       949        96
VIS    2025250    183200   23.9300  146.3000       8.6        90       949        93
VIS    2025250    183200   23.9300  146.2700       8.2        93       952        94
VIS    2025250    183200   23.9300  146.2600       7.9        95       965        92
VIS    2025250    183200   23.9300  145.6800      10.5        97       985        95
VIS    2025250    183200   23.9200  145.6500      10.6        98       963        98
VIS    2025250    183200   23.9200  145.6500      10.5        97       953        99
VIS    2025250    183200   23.9400  145.6200      10.2        94       914       100
VIS    2025250    183200   23.9200  145.5900       9.9        92       905       100
VIS    2025250    183200   23.9200  145.5700       9.8        93       903       100
VIS    2025250    183200   23.9300  145.5300       9.3        97       909        98
VIS    2025250    183200   23.9300  145.0700       9.9        94       996        94
VIS    2025250    183200   23.9100  143.5500      10.1        91       995        98
VIS    2025250    183200   23.9100  142.6100      12.0        98       995        92
VIS    2025250    183200   23.9900  151.6800       6.8        91       959        98
VIS    2025250    183200   23.9600  150.3000       9.1       111       974        90
VIS    2025250    183200   23.9600  150.1400       9.7       109       949        90
VIS    2025250    183200   23.9700  150.1100       8.3       114       949        93
VIS    2025250    183200   23.9800  150.0900       8.0       113       945        95
VIS    2025250    183200   23.9800  150.0700       7.8       108       888        96
VIS    2025250    183200   23.9700  150.0500       8.2       108       894        95
VIS    2025250    183200   23.9500  149.7800       8.0        96       976        97
VIS    2025250    183200   23.9700  149.7600       8.1       104       969        96
VIS    2025250    183200   23.9500  149.7300       8.2        99       951        91
VIS    2025250    183200   23.9500  149.7200       8.2        98       952        91
VIS    2025250    183200   23.9700  149.5700       9.0       123       948        95
VIS    2025250    183200   23.9500  149.5600       8.8       121       936        98
VIS    2025250    183200   23.9400  149.1500       6.9       111       897        96
VIS    2025250    183200   23.9400  149.1400       6.8       109       897        97
VIS    2025250    183200   23.9400  149.1100       5.4       106       901        95
VIS    2025250    183200   23.9400  149.0600       5.3       102       860        90
VIS    2025250    183200   23.9200  146.9900       9.6        96       994        99
VIS    2025250    183200   23.9300  146.9800       9.6        97       994        99
VIS    2025250    183200   23.9100  146.9400       9.2        96       969       100
VIS    2025250    183200   23.9100  146.9300       9.1        95       967        99
VIS    2025250    183200   23.9300  146.8900       9.0        93       989        99
VIS    2025250    183200   23.9200  146.8700       9.2        95       989       100
VIS    2025250    183200   23.9200  146.8300       9.3        93       974       100
VIS    2025250    183200   23.9100  146.8200       9.2        96       946       100
VIS    2025250    183200   23.9100  146.7800       9.1        95       974        97
VIS    2025250    183200   23.9100  146.7700       9.0        95       968        97
VIS    2025250    183200   23.9300  146.7300       9.1        93       949        98
VIS    2025250    183200   23.9200  146.7100       9.5        96       936        98
VIS    2025250    183200   23.9100  146.6900       9.4        97       932        99
VIS    2025250    183200   23.9100  146.6600       9.1        97       918        97
VIS    2025250    183200   23.9200  146.6400       9.2        97       918        97
VIS    2025250    183200   23.9100  146.6000       9.4       100       903        98
VIS    2025250    183200   23.9000  146.5900       9.2        99       903        99
VIS    2025250    183200   23.9000  146.5700       9.2        99       909        98
VIS    2025250    183200   23.9100  146.5400       8.8        97       932        99
VIS    2025250    183200   23.9200  146.5200       9.0        98       933        99
VIS    2025250    183200   23.9200  146.4700       8.9        97       931        97
VIS    2025250    183200   23.9100  146.4600       8.6        95       931        96
VIS    2025250    183200   23.9100  146.3300       8.8        93       972        91
VIS    2025250    183200   23.9000  146.3100       8.7        94       952        92
VIS    2025250    183200   23.9100  146.2800       8.7        93       941        96
VIS    2025250    183200   23.9200  146.2500       8.2        95       965        96
VIS    2025250    183200   23.9000  146.2300       8.6        90       954        95
VIS    2025250    183200   23.8900  145.6900      11.0        96       986        98
VIS    2025250    183200   23.8900  145.6600      10.8        99       953        98
VIS    2025250    183200   23.8900  145.6400      10.5        99       942        98
VIS    2025250    183200   23.9100  145.6000       9.9        92       907       100
VIS    2025250    183200   23.9100  145.5800       9.6        91       907       100
VIS    2025250    183200   23.9000  145.5700       9.6        92       909       100
VIS    2025250    183200   23.8900  143.6000      10.6        96       995        99
VIS    2025250    183200   23.8800  143.5700      10.6        94       995        99
VIS    2025250    183200   23.8700  143.5600      10.5        94       994        99
VIS    2025250    183200   23.9600  151.7100       5.8        87       964        98
VIS    2025250    183200   23.9600  151.6800       6.5        88       959        98
VIS    2025250    183200   23.9600  151.6700       6.6        88       952        95
VIS    2025250    183200   23.9300  150.2700       9.1       112       967        92
VIS    2025250    183200   23.9300  150.2500       8.9       111       967        92
VIS    2025250    183200   23.9500  150.2200       8.8       105       984        94
VIS    2025250    183200   23.9500  150.2100       8.9       104       987        95
VIS    2025250    183200   23.9300  150.1400      10.1       107       925        90
VIS    2025250    183200   23.9500  150.0700       8.5       112       927        91
VIS    2025250    183200   23.9300  150.0400       8.7       112       896        90
VIS    2025250    183200   23.9500  150.0300       8.7       111       894        92
VIS    2025250    183200   23.9400  149.9900       8.9       113       889        90
VIS    2025250    183200   23.9200  149.5700       9.1       118       936        98
VIS    2025250    183200   23.9200  149.5600       9.1       119       920        99
VIS    2025250    183200   23.9100  149.1200       6.2       108       855        93
VIS    2025250    183200   23.9300  149.1000       5.4       107       897        95
VIS    2025250    183200   23.8900  147.0000       9.1        92       994        97
VIS    2025250    183200   23.8800  147.0000       8.9        93       976        97
VIS    2025250    183200   23.8800  146.9700       9.3        95       960        96
VIS    2025250    183200   23.9000  146.9300       9.2        95       949        99
VIS    2025250    183200   23.8900  146.9200       9.3        96       935        98
VIS    2025250    183200   23.8900  146.9000       9.4        96       949        99
VIS    2025250    183200   23.8800  146.8600       9.3        96       946       100
VIS    2025250    183200   23.9000  146.8300       9.3        97       946       100
VIS    2025250    183200   23.9000  146.8100       9.3        97       946       100
VIS    2025250    183200   23.8900  146.7900       9.3        98       946        99
VIS    2025250    183200   23.8900  146.7700       9.1        97       946        97
VIS    2025250    183200   23.8800  146.7300       9.3        98       915        93
VIS    2025250    183200   23.8900  146.7000       9.6        99       931        97
VIS    2025250    183200   23.9000  146.6800       9.5        99       931        99
VIS    2025250    183200   23.8900  146.6600       9.5       102       905        98
VIS    2025250    183200   23.8800  146.6200       9.0       100       899        98
VIS    2025250    183200   23.8800  146.5900       9.2       100       903        98
VIS    2025250    183200   23.8900  146.5900       9.2        99       903        99
VIS    2025250    183200   23.8800  146.5500       9.0        99       912       100
VIS    2025250    183200   23.8900  146.5400       8.8        97       932        99
VIS    2025250    183200   23.8900  146.5000       9.1        99       931        99
VIS    2025250    183200   23.8800  146.4700       9.3       100       921        98
VIS    2025250    183200   23.8800  146.4600       9.1       101       919        98
VIS    2025250    183200   23.8800  146.3100       8.9        96       972        94
VIS    2025250    183200   23.8800  146.3000       9.1        94       952        98
VIS    2025250    183200   23.8700  146.2700       9.2        90       922        98
VIS    2025250    183200   23.8800  146.2600       9.3        88       922        97
VIS    2025250    183200   23.8700  146.2200       9.2        89       945        98
VIS    2025250    183200   23.8700  145.7200      10.2        89       971        91
VIS    2025250    183200   23.8800  145.6700      10.9        96       982        98
VIS    2025250    183200   23.8700  145.6600      10.9        96       942        99
VIS    2025250    183200   23.8800  145.6400      10.5        98       936        99
VIS    2025250    183200   23.8500  143.6400      10.1        89       997        91
VIS    2025250    183200   23.8500  143.6200      10.4        91       989        96
VIS    2025250    183200   23.8500  143.6000      10.7        92       973        98
VIS    2025250    183200   23.8700  143.5600      10.6        94       982        99
VIS    2025250    183200   23.9400  151.7400       6.1        85       971        95
VIS    2025250    183200   23.9400  151.7200       5.7        89       971        99
VIS    2025250    183200   23.9500  151.7100       5.7        88       964        99
VIS    2025250    183200   23.9100  150.2800       9.5       110       944        92
VIS    2025250    183200   23.9100  150.2600       9.2       110       896        93
VIS    2025250    183200   23.9000  150.2500       8.9       110       927        94
VIS    2025250    183200   23.9000  150.2300       8.9       110       938        92
VIS    2025250    183200   23.9100  150.1600       9.9       106       938        90
VIS    2025250    183200   23.9100  150.1300       9.7       104       914        91
VIS    2025250    183200   23.9100  150.1200       9.9       105       914        90
VIS    2025250    183200   23.9100  149.8700       7.8       108       984        90
VIS    2025250    183200   23.9000  149.5800       9.4       111       942        97
VIS    2025250    183200   23.9100  149.5700       9.1       117       936        98
VIS    2025250    183200   23.8900  149.5300      10.3       119       848        94
VIS    2025250    183200   23.8900  149.2400       8.2       129       867        90
VIS    2025250    183200   23.9100  149.1200       6.0       107       827        90
VIS    2025250    183200   23.8900  148.9900       5.1       111       837        91
VIS    2025250    183200   23.9000  148.6500       6.5        99       957        93
VIS    2025250    183200   23.9000  148.6400       6.9        99       957        95
VIS    2025250    183200   23.8600  147.0100       9.1        97       968        98
VIS    2025250    183200   23.8700  146.9800       9.0        94       974        96
VIS    2025250    183200   23.8800  146.9600       9.3        95       952        96
VIS    2025250    183200   23.8700  146.9500       9.3        97       939        96
VIS    2025250    183200   23.8600  146.9100       9.5        97       925        98
VIS    2025250    183200   23.8800  146.8800       9.3        96       946       100
VIS    2025250    183200   23.8700  146.8500       9.1        97       922       100
VIS    2025250    183200   23.8600  146.8500       9.2        98       917        98
VIS    2025250    183200   23.8600  146.8100       9.5        99       914        96
VIS    2025250    183200   23.8700  146.7900       9.7        99       928        98
VIS    2025250    183200   23.8600  146.7700       9.5        97       915        95
VIS    2025250    183200   23.8700  146.7300       9.5        98       911        96
VIS    2025250    183200   23.8600  146.7100       9.8       100       894        97
VIS    2025250    183200   23.8600  146.6700      10.2       103       897        94
VIS    2025250    183200   23.8600  146.6700      10.1       103       897        95
VIS    2025250    183200   23.8700  146.6400       9.5       102       897        95
VIS    2025250    183200   23.8700  146.6000       9.0        99       901        99
VIS    2025250    183200   23.8700  146.5900       9.0        99       901        99
VIS    2025250    183200   23.8700  146.5500       9.1        99       912       100
VIS    2025250    183200   23.8600  146.5200       8.7        98       919        99
VIS    2025250    183200   23.8700  146.5200       8.8        98       931        99
VIS    2025250    183200   23.8600  146.4900       9.3        99       921        99
VIS    2025250    183200   23.8600  146.4400       9.1        99       919        99
VIS    2025250    183200   23.8500  146.3100       9.6        94       982        95
VIS    2025250    183200   23.8700  146.3000       9.2        94       952        98
VIS    2025250    183200   23.8600  146.2800       9.1        94       948        98
VIS    2025250    183200   23.8700  146.2600       9.0        90       922        98
VIS    2025250    183200   23.8600  146.2100       8.7        92       945        98
VIS    2025250    183200   23.8500  145.7000      10.5        87       971        96
VIS    2025250    183200   23.8400  145.6800      10.4        89       937        98
VIS    2025250    183200   23.8400  145.6700      10.6        90       936        98
VIS    2025250    183200   23.8400  145.6400      10.7        93       919        94
VIS    2025250    183200   23.8400  145.4900       9.7        90       989        99
VIS    2025250    183200   23.8600  145.4700       7.9        76       966        91
VIS    2025250    183200   23.8300  143.6800      10.0        95       991        97
VIS    2025250    183200   23.8400  143.6400      10.0        89       997        91
VIS    2025250    183200   23.8400  143.6200      10.5        91       973        97
VIS    2025250    183200   23.8400  143.6100      10.7        91       973        97
VIS    2025250    183200   23.8200  143.5800      10.6        92       959        98
VIS    2025250    183200   23.9100  151.7200       6.7        89       971        94
VIS    2025250    183200   23.9100  151.7000       6.7        87       971        95
VIS    2025250    183200   23.9200  151.6700       6.8        83       962        96
VIS    2025250    183200   23.9200  151.6600       6.8        84       962        95
VIS    2025250    183200   23.9100  151.6400       6.7        87       964        95
VIS    2025250    183200   23.8900  150.3400       8.1       114       964        93
VIS    2025250    183200   23.8800  150.3400       8.0       113       964        94
VIS    2025250    183200   23.9000  150.3100       8.8       109       964        94
VIS    2025250    183200   23.9000  150.2700       9.1       109       896        93
VIS    2025250    183200   23.8900  150.2400       9.0       108       893        91
VIS    2025250    183200   23.8900  150.2300       9.1       108       896        90
VIS    2025250    183200   23.8800  150.1900       9.4       106       941        91
VIS    2025250    183200   23.8900  150.1800       9.4       106       941        91
VIS    2025250    183200   23.8900  150.1500       9.3       104       919        91
VIS    2025250    183200   23.8800  150.1200       9.0       104       914        93
VIS    2025250    183200   23.8900  149.9500       7.4       110       960        90
VIS    2025250    183200   23.8900  149.9200       6.8       111       968        91
VIS    2025250    183200   23.8800  149.8900       6.9       112       981        96
VIS    2025250    183200   23.8700  149.8500       8.1       112       974        95
VIS    2025250    183200   23.8700  149.8400       8.3       112       984        94
VIS    2025250    183200   23.8700  149.6000       9.3       110       942        96
VIS    2025250    183200   23.8700  149.5700       9.6       112       913        98
VIS    2025250    183200   23.8900  149.5400      10.0       117       855        94
VIS    2025250    183200   23.8900  149.5300      10.2       118       848        95
VIS    2025250    183200   23.8700  149.2300       7.5       125       832        92
VIS    2025250    183200   23.8600  149.2100       7.6       121       863        90
VIS    2025250    183200   23.8700  149.1800       7.4       116       832        91
VIS    2025250    183200   23.8700  148.6400       8.1       100       956        98
VIS    2025250    183200   23.8400  147.0000       9.1        99       950       100
VIS    2025250    183200   23.8300  146.9900       9.2       100       950       100
VIS    2025250    183200   23.8500  146.9600       9.2        97       948        95
VIS    2025250    183200   23.8400  146.9200       9.6        97       914        97
VIS    2025250    183200   23.8400  146.9100       9.6        97       914        96
VIS    2025250    183200   23.8500  146.8800       9.2        98       913        97
VIS    2025250    183200   23.8500  146.8600       9.1        98       908        97
VIS    2025250    183200   23.8400  146.8200       9.5        98       908        93
VIS    2025250    183200   23.8500  146.8100       9.4        99       912        95
VIS    2025250    183200   23.8500  146.7700       9.4        97       914        95
VIS    2025250    183200   23.8500  146.7400       9.7        97       894        96
VIS    2025250    183200   23.8300  146.7200       9.8       101       893        97
VIS    2025250    183200   23.8500  146.6900      10.1       102       894        95
VIS    2025250    183200   23.8500  146.6900      10.2       102       894        94
VIS    2025250    183200   23.8500  146.6600      10.0       102       892        95
VIS    2025250    183200   23.8400  146.6100       8.9        97       892        99
VIS    2025250    183200   23.8300  146.6000       8.9        97       894       100
VIS    2025250    183200   23.8400  146.5800       8.9        97       901        99
VIS    2025250    183200   23.8500  146.5500       9.0        98       905        99
VIS    2025250    183200   23.8300  146.5300       8.7        97       907        97
VIS    2025250    183200   23.8400  146.4900       9.2        99       915        99
VIS    2025250    183200   23.8400  146.4800       9.6        98       918        99
VIS    2025250    183200   23.8400  146.4600       9.6        96       915        99
VIS    2025250    183200   23.8400  146.3200       9.9        96       982        95
VIS    2025250    183200   23.8400  146.2900       9.2        96       976        96
VIS    2025250    183200   23.8400  146.2600       8.0       100       948        96
VIS    2025250    183200   23.8400  145.6800      10.2        88       962        97
VIS    2025250    183200   23.8400  145.6600      10.6        91       934        97
VIS    2025250    183200   23.8300  145.5200       9.7        84       990        98
VIS    2025250    183200   23.8300  145.4900       9.4        84       989        98
VIS    2025250    183200   23.8100  145.4600       9.2        90       971        96
VIS    2025250    183200   23.8100  143.6800      10.3        94       991        99
VIS    2025250    183200   23.8000  143.6500      10.1        91       991        99
VIS    2025250    183200   23.8000  143.6500      10.1        91       991        99
VIS    2025250    183200   23.8000  143.6100      10.5        91       977        96
VIS    2025250    183200   23.8200  143.5800      10.6        92       961        97
VIS    2025250    183200   23.8800  151.7500       7.4        95       996        90
VIS    2025250    183200   23.8900  151.7100       7.2        89       979        93
VIS    2025250    183200   23.8900  151.6700       7.1        86       961        95
VIS    2025250    183200   23.9000  151.6400       6.8        86       960        98
VIS    2025250    183200   23.8600  150.8700       6.5        99       984        90
VIS    2025250    183200   23.8600  150.8400       7.6       104       959        92
VIS    2025250    183200   23.8700  150.1200       9.1       106       914        90
VIS    2025250    183200   23.8700  150.1100       8.8       104       919        94
VIS    2025250    183200   23.8500  150.0900       8.5       104       949        95
VIS    2025250    183200   23.8500  149.9900       9.3       107       982        90
VIS    2025250    183200   23.8600  149.9700       8.2       107       976        95
VIS    2025250    183200   23.8600  149.9600       7.5       106       971        95
VIS    2025250    183200   23.8700  149.9100       6.9       107       970        98
VIS    2025250    183200   23.8500  149.8900       7.8       112       967        95
VIS    2025250    183200   23.8500  149.8800       7.8       111       967        95
VIS    2025250    183200   23.8600  149.8500       8.1       112       966        95
VIS    2025250    183200   23.8500  149.8200       7.8       106       949        96
VIS    2025250    183200   23.8600  149.6300       8.7        97       963        91
VIS    2025250    183200   23.8600  149.6200       8.8       101       954        94
VIS    2025250    183200   23.8600  149.5900       9.4       112       930        96
VIS    2025250    183200   23.8500  149.5600      10.2       117       873        94
VIS    2025250    183200   23.8600  149.5400       9.6       112       858        96
VIS    2025250    183200   23.8500  148.8600       8.2       104       990        95
VIS    2025250    183200   23.8300  148.7700       8.0       100       990        95
VIS    2025250    183200   23.8100  147.0400       9.4       100       929       100
VIS    2025250    183200   23.8200  147.0200       9.4       100       929       100
VIS    2025250    183200   23.8100  147.0100       9.5       100       941        99
VIS    2025250    183200   23.8200  146.9800       9.6       103       948        97
VIS    2025250    183200   23.8200  146.9400       9.4       100       927        95
VIS    2025250    183200   23.8300  146.9300       9.4        97       918        97
VIS    2025250    183200   23.8200  146.9000       9.2        96       908        93
VIS    2025250    183200   23.8000  146.8600       9.6        95       908        96
VIS    2025250    183200   23.8200  146.8400       9.7        97       906        93
VIS    2025250    183200   23.8100  146.8000       8.6        95       906        91
VIS    2025250    183200   23.8200  146.7600       8.5        98       899       100
VIS    2025250    183200   23.8100  146.7500       8.0        99       899        99
VIS    2025250    183200   23.8100  146.7000       9.2       100       886        99
VIS    2025250    183200   23.8100  146.6800       9.3        99       886        99
VIS    2025250    183200   23.8200  146.6500       9.5       100       887        99
VIS    2025250    183200   23.8100  146.6300       9.3       100       886       100
VIS    2025250    183200   23.8200  146.6100       9.1        96       893       100
VIS    2025250    183200   23.8200  146.5800       8.9        95       900       100
VIS    2025250    183200   23.8200  146.5700       8.9        94       901        99
VIS    2025250    183200   23.8100  146.5500       8.7        95       905        99
VIS    2025250    183200   23.8100  146.5000       8.4        98       913        98
VIS    2025250    183200   23.8200  146.4900       9.0        99       915        99
VIS    2025250    183200   23.8100  146.4600       9.3        99       927        99
VIS    2025250    183200   23.8100  146.4200       9.1        97       943        96
VIS    2025250    183200   23.8000  145.6700      10.3        93       937        93
VIS    2025250    183200   23.8100  145.6600      10.5        93       937        94
VIS    2025250    183200   23.7900  145.6000      11.4        93       961        92
VIS    2025250    183200   23.8000  145.5500       9.5        89       986        99
VIS    2025250    183200   23.7900  145.5100       9.7        84       959        98
VIS    2025250    183200   23.7900  145.5100       9.7        82       986        98
VIS    2025250    183200   23.7900  144.9400       9.7        96       988        90
VIS    2025250    183200   23.7800  144.9000       9.9        99       956        92
VIS    2025250    183200   23.7800  143.7100      10.1        94       988       100
VIS    2025250    183200   23.7700  143.7000      10.3        93       988        99
VIS    2025250    183200   23.7800  143.6600      10.1        92       991        99
VIS    2025250    183200   23.7900  143.6500      10.1        91       991        99
VIS    2025250    183200   23.7900  143.6100      10.5        91       981        98
VIS    2025250    183200   23.7900  143.6000      10.4        91       977        97
VIS    2025250    183200   23.8600  151.6500       7.1        84       944        90
VIS    2025250    183200   23.8400  150.8900       6.9       106       975        91
VIS    2025250    183200   23.8400  150.2700       8.1       104       991        92
VIS    2025250    183200   23.8300  150.0900       7.8       107       949        93
VIS    2025250    183200   23.8300  150.0800       7.8       106       960        94
VIS    2025250    183200   23.8400  149.9600       8.2       106       970        91
VIS    2025250    183200   23.8400  149.9400       7.5       106       967        90
VIS    2025250    183200   23.8400  149.9200       7.7       107       967        90
VIS    2025250    183200   23.8400  149.8800       8.0       112       964        93
VIS    2025250    183200   23.8400  149.8700       7.8       111       956        94
VIS    2025250    183200   23.8400  149.8300       7.9       108       949        95
VIS    2025250    183200   23.8300  149.5700      10.5       119       902        94
VIS    2025250    183200   23.8300  149.5400      10.2       117       885        94
VIS    2025250    183200   23.8100  149.5200       9.0       116       885        92
VIS    2025250    183200   23.8200  148.7800       7.9       101       990        95
VIS    2025250    183200   23.7800  147.0600       9.3       101       949        99
VIS    2025250    183200   23.7800  147.0500       9.3       101       949        99
VIS    2025250    183200   23.7900  147.0000       9.6        98       949        99
VIS    2025250    183200   23.7900  146.9400       9.0       100       935        90
VIS    2025250    183200   23.7800  146.9200       8.2        96       935        97
VIS    2025250    183200   23.7800  146.8900       9.0        95       928        97
VIS    2025250    183200   23.7900  146.8700       9.4        94       908        98
VIS    2025250    183200   23.7900  146.8500       9.7        95       914        98
VIS    2025250    183200   23.7900  146.8100       9.1        98       915        94
VIS    2025250    183200   23.8000  146.7800       7.9        95       910        93
VIS    2025250    183200   23.7900  146.7600       7.1       101       914        94
VIS    2025250    183200   23.7800  146.7300       7.7       104       931        94
VIS    2025250    183200   23.7800  146.7100       8.7       101       895       100
VIS    2025250    183200   23.7800  146.6700       9.0        96       887        99
VIS    2025250    183200   23.7900  146.6700       9.0        97       887        99
VIS    2025250    183200   23.7700  146.6200       9.2        96       887        99
VIS    2025250    183200   23.7700  146.5900       9.0        93       892        99
VIS    2025250    183200   23.7800  146.5800       9.0        93       895        99
VIS    2025250    183200   23.7800  146.5400       8.7        97       903        98
VIS    2025250    183200   23.7700  146.5400       8.9        97       913        98
VIS    2025250    183200   23.7900  146.5000       8.9        98       922        99
VIS    2025250    183200   23.7900  146.4800       9.3        99       932        99
VIS    2025250    183200   23.7700  146.4200       8.7        99       974        94
VIS    2025250    183200   23.7800  145.8400      12.3       101       976        91
VIS    2025250    183200   23.7800  145.8200      11.1        95       971        90
VIS    2025250    183200   23.7700  145.8100      10.8        94       971        90
VIS    2025250    183200   23.7600  145.7800      10.7        90       971        91
VIS    2025250    183200   23.7700  145.7100      10.6        92       954        99
VIS    2025250    183200   23.7600  145.6800      10.2        92       968        99
VIS    2025250    183200   23.7600  145.6400      10.2        93       974        99
VIS    2025250    183200   23.7800  145.6300      10.6        92       974        99
VIS    2025250    183200   23.7800  145.6000      10.3        91       959        99
VIS    2025250    183200   23.7600  145.5700       9.8        89       954        99
VIS    2025250    183200   23.7600  145.5500       9.2        89       951        99
VIS    2025250    183200   23.7700  145.5200       9.5        86       951        98
VIS    2025250    183200   23.7600  145.4900      10.4        86       959        98
VIS    2025250    183200   23.7600  145.4600      10.7        89       971        97
VIS    2025250    183200   23.7800  145.0100       9.7        93       998        95
VIS    2025250    183200   23.7800  144.9800       9.7        88       998        91
VIS    2025250    183200   23.7800  144.9400      10.1        92       991        94
VIS    2025250    183200   23.7700  144.9200      10.2        98       966        99
VIS    2025250    183200   23.7600  144.9100      10.2        98       930        98
VIS    2025250    183200   23.7800  144.8900      10.1        96       930        93
VIS    2025250    183200   23.7600  144.8600      10.0        89       903        98
VIS    2025250    183200   23.7500  144.8400       9.7        84       904        99
VIS    2025250    183200   23.7600  144.8100       9.8        86       911        97
VIS    2025250    183200   23.7500  143.7200      10.2        90       995        98
VIS    2025250    183200   23.7400  143.6900      10.3        91       988        99
VIS    2025250    183200   23.7400  143.6700      10.3        91       987        99
VIS    2025250    183200   23.7400  143.6300      10.2        92       978       100
VIS    2025250    183200   23.8400  151.8700       7.1        87       987        91
VIS    2025250    183200   23.8500  151.8400       6.5        96       987        92
VIS    2025250    183200   23.8300  151.7500       5.8        98       988       100
VIS    2025250    183200   23.8400  151.7200       7.2        84       976        94
VIS    2025250    183200   23.8300  151.6700       7.6        87       976        95
VIS    2025250    183200   23.8400  151.6500       7.3        83       957        90
VIS    2025250    183200   23.8100  150.9000       7.6       107       975        92
VIS    2025250    183200   23.8300  150.8700       7.2       107       975        92
VIS    2025250    183200   23.8200  150.8700       7.4       108       926        95
VIS    2025250    183200   23.8100  149.5100       8.8       117       885        94
VIS    2025250    183200   23.8000  149.4900       8.2       115       864        94
VIS    2025250    183200   23.7500  147.0800       9.7        97       978        97
VIS    2025250    183200   23.7500  147.0600       9.4        95       953        98
VIS    2025250    183200   23.7700  147.0400       9.4       100       949        99
VIS    2025250    183200   23.7700  147.0100       9.7        97       952        99
VIS    2025250    183200   23.7700  146.9800       9.9        97       972        97
VIS    2025250    183200   23.7600  146.9700       9.6        93       976        98
VIS    2025250    183200   23.7700  146.9200       8.3        95       954        96
VIS    2025250    183200   23.7600  146.8800       9.4        97       931        97
VIS    2025250    183200   23.7600  146.8700       9.6        97       928        98
VIS    2025250    183200   23.7600  146.8500       9.4        97       922        99
VIS    2025250    183200   23.7700  146.8200       9.3        99       919        96
VIS    2025250    183200   23.7700  146.7700       7.5       105       950        92
VIS    2025250    183200   23.7500  146.7200       8.6       108       943        97
VIS    2025250    183200   23.7700  146.7100       8.8       102       903       100
VIS    2025250    183200   23.7700  146.6800       8.9        97       888        99
VIS    2025250    183200   23.7600  146.6500       8.8        99       888        99
VIS    2025250    183200   23.7600  146.6400       8.8        97       888        99
VIS    2025250    183200   23.7500  146.6100       9.1        96       892        99
VIS    2025250    183200   23.7700  146.5700       8.8        93       898        99
VIS    2025250    183200   23.7600  146.5700       8.9        95       901        97
VIS    2025250    183200   23.7700  146.5400       8.9        97       913        98
VIS    2025250    183200   23.7500  146.4900       9.5        97       954        98
VIS    2025250    183200   23.7500  146.4800       9.6        98       960        99
VIS    2025250    183200   23.7700  146.4300       8.8        98       974        94
VIS    2025250    183200   23.7600  145.9000      11.6       100       995        93
VIS    2025250    183200   23.7400  145.8300       9.5       100       938        96
VIS    2025250    183200   23.7400  145.8200      10.1        96       938        99
VIS    2025250    183200   23.7400  145.7800      11.2        91       955        96
VIS    2025250    183200   23.7400  145.7600      11.9        93       938        93
VIS    2025250    183200   23.7400  145.7000      10.5        92       948        97
VIS    2025250    183200   23.7400  145.6900      10.3        90       948        97
VIS    2025250    183200   23.7400  145.6500      10.3        94       933        91
VIS    2025250    183200   23.7400  145.6400      10.2        95       933        90
VIS    2025250    183200   23.7500  145.6200       9.7        93       955        97
VIS    2025250    183200   23.7500  145.5800       9.8        91       918        99
VIS    2025250    183200   23.7600  145.5600       9.5        90       926        99
VIS    2025250    183200   23.7400  145.5200       9.2        90       916        99
VIS    2025250    183200   23.7400  145.5100       9.0        91       916        99
VIS    2025250    183200   23.7600  145.4900      10.3        86       959        99
VIS    2025250    183200   23.7500  145.4600      10.1        87       971        98
VIS    2025250    183200   23.7300  145.0600      10.2        88      1000        95
VIS    2025250    183200   23.7300  145.0300      10.3        89       978       100
VIS    2025250    183200   23.7300  145.0000      10.3        92       964        99
VIS    2025250    183200   23.7400  144.9900      10.1        91       991        99
VIS    2025250    183200   23.7300  144.9600      10.4        93       953        99
VIS    2025250    183200   23.7300  144.9200      10.4        93       930       100
VIS    2025250    183200   23.7300  144.9100      10.4        92       918        99
VIS    2025250    183200   23.7300  144.8700       9.8        90       904        98
VIS    2025250    183200   23.7300  144.8600       9.7        89       903        98
VIS    2025250    183200   23.7300  144.8400       9.3        87       903        98
VIS    2025250    183200   23.7400  144.7900       9.8        87       913        99
VIS    2025250    183200   23.7300  144.7900       9.6        87       917        99
VIS    2025250    183200   23.7400  143.7000      10.3        90       988        99
VIS    2025250    183200   23.7300  143.6900      10.4        91       988       100
VIS    2025250    183200   23.7200  143.6400      10.2        92       974       100
VIS    2025250    183200   23.8100  151.7400       6.2        91       988       100
VIS    2025250    183200   23.8100  151.7300       6.4        90       988        99
VIS    2025250    183200   23.8000  151.6900       7.1        86       967        97
VIS    2025250    183200   23.8000  151.6700       7.4        86       967        96
VIS    2025250    183200   23.8000  151.6400       7.3        83       904        96
VIS    2025250    183200   23.7900  150.8900       7.3       107       961        94
VIS    2025250    183200   23.7800  150.8600       7.8       108       915        97
VIS    2025250    183200   23.7800  150.8400       8.2       110       915        96
VIS    2025250    183200   23.7600  149.5600       7.5       103       969        95
VIS    2025250    183200   23.7800  149.5300       8.0       113       936        98
VIS    2025250    183200   23.7800  149.5100       7.5       111       926        99
VIS    2025250    183200   23.7700  149.4800       7.3       105       893        93
VIS    2025250    183200   23.7700  149.4700       7.5       102       893        91
VIS    2025250    183200   23.7600  149.4200       8.3       107       897        93
VIS    2025250    183200   23.7300  147.1500       9.0        82       996        90
VIS    2025250    183200   23.7400  147.1300       9.8        95       994        91
VIS    2025250    183200   23.7300  147.1100       9.7        88       988        99
VIS    2025250    183200   23.7400  147.0800       9.5        92       980        99
VIS    2025250    183200   23.7500  147.0600       9.4        93       953        98
VIS    2025250    183200   23.7300  147.0300       9.5        94       936        97
VIS    2025250    183200   23.7400  147.0100       9.5        93       938        97
VIS    2025250    183200   23.7400  146.9700       9.5        91       959        99
VIS    2025250    183200   23.7300  146.9400       9.3        88       982        96
VIS    2025250    183200   23.7300  146.9200       9.1        90       983        96
VIS    2025250    183200   23.7500  146.8900       9.5        96       943        94
VIS    2025250    183200   23.7500  146.8600       9.7        97       924        97
VIS    2025250    183200   23.7200  146.8200      10.3       110       935        91
VIS    2025250    183200   23.7400  146.7200       9.5       111       930        97
VIS    2025250    183200   23.7300  146.6900       9.2       113       906        91
VIS    2025250    183200   23.7300  146.6700       8.8       109       897        96
VIS    2025250    183200   23.7200  146.6600       8.8       109       897        96
VIS    2025250    183200   23.7300  146.6300       9.1        99       896        99
VIS    2025250    183200   23.7400  146.5900       9.3        98       896        98
VIS    2025250    183200   23.7400  146.5900       9.3        98       901        97
VIS    2025250    183200   23.7200  146.5600       9.7        99       929        95
VIS    2025250    183200   23.7400  146.5200       9.2        95       945        95
VIS    2025250    183200   23.7300  146.5000       9.3        97       955        97
VIS    2025250    183200   23.7400  146.4700       9.4        97       969        99
VIS    2025250    183200   23.7300  145.8200       9.9        97       938        99
VIS    2025250    183200   23.7100  145.7900      11.7        90       923        98
VIS    2025250    183200   23.7100  145.7900      11.7        91       923        98
VIS    2025250    183200   23.7200  145.7600      11.8        92       909        97
VIS    2025250    183200   23.7300  145.7400      12.0        92       909        90
VIS    2025250    183200   23.7300  145.6900      10.4        90       948        97
VIS    2025250    183200   23.7300  145.6900      10.3        90       948        97
VIS    2025250    183200   23.7300  145.6600      10.3        92       933        95
VIS    2025250    183200   23.7100  145.5900      10.1        98       908        93
VIS    2025250    183200   23.7200  145.5700       9.2        97       909        97
VIS    2025250    183200   23.7100  145.5400       8.4        99       916        96
VIS    2025250    183200   23.7200  145.5100       8.7        95       929        97
VIS    2025250    183200   23.7100  145.4900       8.3        93       945        96
VIS    2025250    183200   23.7200  145.4800       8.5        90       945        98
VIS    2025250    183200   23.7100  145.1200      10.8        89       983        96
VIS    2025250    183200   23.7200  145.0600      10.1        87       999       100
VIS    2025250    183200   23.7200  145.0600      10.2        88       995       100
VIS    2025250    183200   23.7000  145.0100      10.5        90       960        98
VIS    2025250    183200   23.7200  145.0000      10.4        92       960        99
VIS    2025250    183200   23.7200  144.9600      10.3        93       953        98
VIS    2025250    183200   23.7200  144.9500      10.1        93       938        98
VIS    2025250    183200   23.7200  144.9100      10.4        93       918       100
VIS    2025250    183200   23.7100  144.9000      10.6        92       918        98
VIS    2025250    183200   23.7200  144.8700       9.6        90       911        98
VIS    2025250    183200   23.7100  144.8500       9.0        89       911        97
VIS    2025250    183200   23.7000  144.8200       8.8        89       911        98
VIS    2025250    183200   23.7200  144.7800       9.4        83       917        99
VIS    2025250    183200   23.7000  144.7700       9.6        83       936        99
VIS    2025250    183200   23.7100  144.7400       9.9        81       963        98
VIS    2025250    183200   23.7000  144.0500      10.0        97       993        99
VIS    2025250    183200   23.7100  143.6900      10.1        89       985        95
VIS    2025250    183200   23.7100  143.6800      10.1        90       982        98
VIS    2025250    183200   23.7100  143.6500      10.2        91       974       100
VIS    2025250    183200   23.7900  151.7600       6.6        90       988        94
VIS    2025250    183200   23.7800  151.7300       6.5        89       972        99
VIS    2025250    183200   23.7900  151.7200       6.3        91       978       100
VIS    2025250    183200   23.7800  151.7000       6.8        89       978        98
VIS    2025250    183200   23.7700  151.6500       8.0        81       909        93
VIS    2025250    183200   23.7700  151.6200       7.8        82       883        93
VIS    2025250    183200   23.7700  151.0000       7.4       106       987        93
VIS    2025250    183200   23.7700  150.9500       7.2       105       977        92
VIS    2025250    183200   23.7600  150.9200       7.0        99       964        96
VIS    2025250    183200   23.7700  150.8900       6.9       105       936        97
VIS    2025250    183200   23.7700  150.8600       7.5       106       915        99
VIS    2025250    183200   23.7600  150.8400       7.1       106       914        99
VIS    2025250    183200   23.7400  149.5400       7.5        99       969        95
VIS    2025250    183200   23.7400  149.5200       7.5       100       960        96
VIS    2025250    183200   23.7500  149.5000       7.7       102       958        94
VIS    2025250    183200   23.7600  149.4700       7.5        99       920        91
VIS    2025250    183200   23.7400  149.4400       8.1       106       916        96
VIS    2025250    183200   23.7400  149.4400       8.2       106       899        95
VIS    2025250    183200   23.7500  149.4000       9.1       118       892        91
VIS    2025250    183200   23.7300  149.3100       9.6       125       848        96
VIS    2025250    183200   23.7100  147.5400       9.5        82       994        96
VIS    2025250    183200   23.7100  147.1300       9.7        90       994        96
VIS    2025250    183200   23.7000  147.1000       9.7        89       981        99
VIS    2025250    183200   23.7000  147.0700       9.8        92       952        99
VIS    2025250    183200   23.7200  147.0500       9.4        94       949        98
VIS    2025250    183200   23.7200  147.0200       9.8        95       935        96
VIS    2025250    183200   23.7000  147.0000       9.7        98       923        93
VIS    2025250    183200   23.7200  146.9700       9.2        92       947        95
VIS    2025250    183200   23.7100  146.9500       9.1        92       959        96
VIS    2025250    183200   23.7200  146.9400       9.2        91       978        97
VIS    2025250    183200   23.7000  146.9100       8.9        99       974        94
VIS    2025250    183200   23.7200  146.8900       9.2        96       944        98
VIS    2025250    183200   23.7200  146.8600       9.6        99       924        98
VIS    2025250    183200   23.7000  146.6600       9.1       110       906        92
VIS    2025250    183200   23.7100  146.6300       9.1       101       897        99
VIS    2025250    183200   23.7200  146.5900       9.7       100       903        94
VIS    2025250    183200   23.7200  146.5600       9.7       101       929        95
VIS    2025250    183200   23.7000  146.5500       9.5       100       931        98
VIS    2025250    183200   23.7000  146.5300       9.7        97       931       100
VIS    2025250    183200   23.6900  146.4600       8.9        99       989        96
VIS    2025250    183200   23.6900  145.8300      10.4        93       920        98
VIS    2025250    183200   23.7000  145.8200      11.3        88       920        95
VIS    2025250    183200   23.6900  145.7900      11.9        89       905        96
VIS    2025250    183200   23.6900  145.7600      12.0        91       901        97
VIS    2025250    183200   23.7000  145.7300      11.4        89       900        96
VIS    2025250    183200   23.6900  145.7000      11.2        90       899        98
VIS    2025250    183200   23.6900  145.6700      10.4        88       898       100
VIS    2025250    183200   23.6900  145.6600      10.3        88       898       100
VIS    2025250    183200   23.7000  145.6400      10.4        92       899        97
VIS    2025250    183200   23.7100  145.6000      10.4        98       903        93
VIS    2025250    183200   23.7000  145.5900       9.8        99       903        93
VIS    2025250    183200   23.7000  145.5600       8.5        99       909        95
VIS    2025250    183200   23.7000  145.5400       8.3       101       916        94
VIS    2025250    183200   23.6900  145.5000       8.6        96       940        95
VIS    2025250    183200   23.7000  145.4900       8.1        93       945        94
VIS    2025250    183200   23.6900  145.1500      10.1        89       998        97
VIS    2025250    183200   23.6900  145.1300      10.5        91       983        99
VIS    2025250    183200   23.6800  145.1000      10.7        91       962        97
VIS    2025250    183200   23.6800  145.0900      10.7        91       962        97
VIS    2025250    183200   23.6800  145.0600      10.3        88       970        98
VIS    2025250    183200   23.7000  145.0200      10.3        89       960        98
VIS    2025250    183200   23.6900  145.0100      10.4        90       948        99
VIS    2025250    183200   23.7000  144.9800      10.5        91       938        99
VIS    2025250    183200   23.6800  144.9500       9.7        92       933        96
VIS    2025250    183200   23.6800  144.9300      10.1        93       916        95
VIS    2025250    183200   23.6900  144.9000      10.2        91       915        93
VIS    2025250    183200   23.6900  144.8900      10.1        90       915        93
VIS    2025250    183200   23.7000  144.8600       9.0        90       913        90
VIS    2025250    183200   23.6900  144.8200       9.0        90       910        97
VIS    2025250    183200   23.6800  144.7900       9.5        90       909        99
VIS    2025250    183200   23.6900  144.7700       9.7        85       917        99
VIS    2025250    183200   23.6900  144.7600       9.8        85       928       100
VIS    2025250    183200   23.6800  144.7300      10.1        84       951        99
VIS    2025250    183200   23.6800  144.7100      10.3        84       963        98
VIS    2025250    183200   23.6700  143.6800      10.8        95       976        96
VIS    2025250    183200   23.7600  151.7500       6.8        88       966        94
VIS    2025250    183200   23.7600  151.7300       6.7        87       966        95
VIS    2025250    183200   23.7500  151.7100       6.8        89       972        95
VIS    2025250    183200   23.7500  151.6800       7.2        83       967        93
VIS    2025250    183200   23.7600  151.6400       8.1        81       888        92
VIS    2025250    183200   23.7500  151.6100       8.0        86       883        95
VIS    2025250    183200   23.7600  151.6000       7.6        88       935        90
VIS    2025250    183200   23.7400  151.0100       7.4       103       990        91
VIS    2025250    183200   23.7500  150.9600       7.3       109       974        90
VIS    2025250    183200   23.7300  150.8800       6.9       102       909        99
VIS    2025250    183200   23.7400  150.8700       6.7       104       903        99
VIS    2025250    183200   23.7500  150.8400       6.7       107       901        99
VIS    2025250    183200   23.7300  149.5700       7.7        97       977        93
VIS    2025250    183200   23.7100  149.5500       7.4       104       977        95
VIS    2025250    183200   23.7300  149.5400       7.7       102       969        97
VIS    2025250    183200   23.7200  149.5000       7.8       102       957        90
VIS    2025250    183200   23.7200  149.4900       7.8       103       957        91
VIS    2025250    183200   23.7100  149.4400       7.9       107       916        95
VIS    2025250    183200   23.7300  149.4300       8.2       108       903        94
VIS    2025250    183200   23.7200  149.3100       9.5       126       852        90
VIS    2025250    183200   23.7300  149.2900       9.7       130       851        90
VIS    2025250    183200   23.6900  147.6600      10.0        83       997        90
VIS    2025250    183200   23.6900  147.6300      10.4        81       999        94
VIS    2025250    183200   23.6900  147.5900      10.2        81       974        96
VIS    2025250    183200   23.6800  147.5600       9.1        85       990        98
VIS    2025250    183200   23.6800  147.5300       9.7        83       990        97
VIS    2025250    183200   23.6900  147.5100      10.2        80       994        95
VIS    2025250    183200   23.6900  147.5000      10.3        83       989        97
VIS    2025250    183200   23.6900  147.4800      10.6        89       995        98
VIS    2025250    183200   23.6800  147.4500      10.1        95       983       100
VIS    2025250    183200   23.6900  147.4300       9.2        92       983        99
VIS    2025250    183200   23.6800  147.3800       9.5        86       990        99
VIS    2025250    183200   23.6800  147.3700       9.2        86       990        99
VIS    2025250    183200   23.6800  147.1500       9.8        85       994        93
VIS    2025250    183200   23.6800  147.1300       9.7        91       973        99
VIS    2025250    183200   23.6800  147.1000       9.5        92       953       100
VIS    2025250    183200   23.7000  147.0900       9.7        90       961        99
VIS    2025250    183200   23.7000  147.0600       9.8        94       936        98
VIS    2025250    183200   23.7000  147.0200      10.3        96       915        98
VIS    2025250    183200   23.7000  147.0100      10.2        99       917        96
VIS    2025250    183200   23.6800  146.9700       9.1       102       923        91
VIS    2025250    183200   23.6800  146.9600       8.7        99       923        93
VIS    2025250    183200   23.6700  146.9400       8.6        98       938        96
VIS    2025250    183200   23.6800  146.8900       9.3       107       964        96
VIS    2025250    183200   23.6900  146.8800       9.4       108       945        96
VIS    2025250    183200   23.6900  146.8500      10.1       110       917        94
VIS    2025250    183200   23.6800  146.7900       9.4       113       904        94
VIS    2025250    183200   23.6800  146.7800       8.8       108       901        95
VIS    2025250    183200   23.6900  146.7600      10.2       111       907        91
VIS    2025250    183200   23.6800  146.6400       9.1       107       924        90
VIS    2025250    183200   23.6900  146.6200       9.1       103       924        95
VIS    2025250    183200   23.6900  146.6100       9.1       104       924        94
VIS    2025250    183200   23.6700  146.5700       8.6       108       958        92
VIS    2025250    183200   23.6700  146.5400       8.8       104       949        94
VIS    2025250    183200   23.6700  146.5100      10.0       102       960        95
VIS    2025250    183200   23.6800  146.5000      10.2       102       966        95
VIS    2025250    183200   23.6700  146.4800       9.6       101       986        95
VIS    2025250    183200   23.6800  145.8700       9.1       103       925        91
VIS    2025250    183200   23.6700  145.8500      11.1        87       926        97
VIS    2025250    183200   23.6800  145.8400      11.0        88       925        94
VIS    2025250    183200   23.6600  145.8100      11.5        88       905        93
VIS    2025250    183200   23.6800  145.7900      11.9        90       902        96
VIS    2025250    183200   23.6700  145.7600      12.2        92       900        97
VIS    2025250    183200   23.6600  145.7300      12.0        92       899        98
VIS    2025250    183200   23.6600  145.7000      11.3        90       898        99
VIS    2025250    183200   23.6700  145.6700      10.3        89       898       100
VIS    2025250    183200   23.6600  145.6600      10.1        89       898        97
VIS    2025250    183200   23.6700  145.6200      10.1        95       899        96
VIS    2025250    183200   23.6700  145.6100      10.0        96       899        96
VIS    2025250    183200   23.6600  145.5500       9.5        97       902        95
VIS    2025250    183200   23.6800  145.5300       8.4       101       914        92
VIS    2025250    183200   23.6600  145.4900       9.9        93       924        99
VIS    2025250    183200   23.6600  145.4600      10.0        92       948        99
VIS    2025250    183200   23.6800  145.4400       8.6        97       979        91
VIS    2025250    183200   23.6700  145.4300       8.8        96       979        95
VIS    2025250    183200   23.6600  145.3300      10.2        94       977        99
VIS    2025250    183200   23.6600  145.3200      10.1        93       977        99
VIS    2025250    183200   23.6500  145.2200      10.7        95       982        98
VIS    2025250    183200   23.6500  145.2000      11.0        94       969        98
VIS    2025250    183200   23.6700  145.1100      10.5        92       932        99
VIS    2025250    183200   23.6700  145.0900      10.6        92       962        97
VIS    2025250    183200   23.6700  145.0700      10.8        89       970        96
VIS    2025250    183200   23.6700  145.0600      10.1        87       970        99
VIS    2025250    183200   23.6600  145.0200       9.9        90       945       100
VIS    2025250    183200   23.6500  144.9900       9.8        90       933        99
VIS    2025250    183200   23.6700  144.9600       9.9        90       933        96
VIS    2025250    183200   23.6700  144.9500       9.8        92       932        96
VIS    2025250    183200   23.6500  144.9100      10.2        91       902        92
VIS    2025250    183200   23.6600  144.9000      10.2        91       902        91
VIS    2025250    183200   23.6500  144.8800      10.0        88       902        93
VIS    2025250    183200   23.6600  144.8400      10.1        86       902        98
VIS    2025250    183200   23.6600  144.8100       9.8        91       905        99
VIS    2025250    183200   23.6700  144.7900       9.7        91       909        98
VIS    2025250    183200   23.6700  144.7800       9.7        89       911        98
VIS    2025250    183200   23.6700  144.7500       9.8        86       923        98
VIS    2025250    183200   23.6700  144.7100      10.3        85       977        98
VIS    2025250    183200   23.6600  144.7000      10.2        85       977        97
VIS    2025250    183200   23.6400  144.0900      10.8        95       998        98
VIS    2025250    183200   23.6600  143.7100      10.7        92       997        96
VIS    2025250    183200   23.6500  143.6800      10.9        96       970        98
VIS    2025250    183200   23.6600  143.6600      11.0        95       970        98
VIS    2025250    183200   23.7400  151.6000       7.6        89       935        94
VIS    2025250    183200   23.7300  150.9100       7.5       106       919        95
VIS    2025250    183200   23.7300  150.8900       7.0       102       909        99
VIS    2025250    183200   23.7300  150.8500       6.7       105       890        94
VIS    2025250    183200   23.7000  149.5600       6.9       102       977        93
VIS    2025250    183200   23.7100  149.5400       7.2       105       977        96
VIS    2025250    183200   23.7100  149.5100       7.5       107       958        93
VIS    2025250    183200   23.6800  149.4800       7.5       106       926        98
VIS    2025250    183200   23.6900  149.4500       7.9       106       918        97
VIS    2025250    183200   23.6900  149.4400       8.2       112       916        96
VIS    2025250    183200   23.6800  149.3500       9.9       123       855        93
VIS    2025250    183200   23.6800  149.3200       9.6       117       854        91
VIS    2025250    183200   23.6800  149.3000       9.2       119       851        93
VIS    2025250    183200   23.7000  149.2800       8.5       126       854        95
VIS    2025250    183200   23.7000  149.2600       8.1       123       855        91
VIS    2025250    183200   23.6600  147.6900       9.0        88       989        98
VIS    2025250    183200   23.6600  147.6600       9.8        82       997        92
VIS    2025250    183200   23.6600  147.6400       9.7        82       985        96
VIS    2025250    183200   23.6600  147.6100       9.8        82       972        96
VIS    2025250    183200   23.6600  147.5700       9.1        88       974        99
VIS    2025250    183200   23.6600  147.5700       9.2        88       974        99
VIS    2025250    183200   23.6600  147.5400       9.4        87       978        99
VIS    2025250    183200   23.6600  147.5100       9.3        88       978        99
VIS    2025250    183200   23.6800  147.4800      10.0        96       983        99
VIS    2025250    183200   23.6500  147.4500      10.0        95       972        99
VIS    2025250    183200   23.6600  147.4200       9.1        91       972        99
VIS    2025250    183200   23.6500  147.4000       8.9        86       961        98
VIS    2025250    183200   23.6500  147.3700       9.0        85       961        98
VIS    2025250    183200   23.6600  147.3500       9.1        84       974        90
VIS    2025250    183200   23.6700  147.3200       9.6        71       985        91
VIS    2025250    183200   23.6500  147.2900       9.3        92       987        94
VIS    2025250    183200   23.6600  147.2700      10.0        99       993        97
VIS    2025250    183200   23.6600  147.2600      10.8       102       993        97
VIS    2025250    183200   23.6500  147.2100       9.8        96       978       100
VIS    2025250    183200   23.6500  147.1900       9.3        88       980        99
VIS    2025250    183200   23.6700  147.1600      10.0        85       994        91
VIS    2025250    183200   23.6700  147.1600       9.9        86       994        93
VIS    2025250    183200   23.6700  147.1100       9.5        92       961       100
VIS    2025250    183200   23.6600  147.0900       9.4        93       934        99
VIS    2025250    183200   23.6500  147.0600       9.7        93       933       100
VIS    2025250    183200   23.6500  147.0400      10.0        96       929       100
VIS    2025250    183200   23.6500  147.0100       9.8       107       915        97
VIS    2025250    183200   23.6500  146.9900       9.2       103       911        96
VIS    2025250    183200   23.6500  146.9800       9.0       100       910        95
VIS    2025250    183200   23.6600  146.9500       8.6        97       923        95
VIS    2025250    183200   23.6500  146.9000       9.4       104       956        96
VIS    2025250    183200   23.6500  146.8900       9.4       105       951        96
VIS    2025250    183200   23.6500  146.8600       9.2       111       928        93
VIS    2025250    183200   23.6500  146.8300      10.0       115       910        92
VIS    2025250    183200   23.6500  146.8200      10.1       114       908        93
VIS    2025250    183200   23.6600  146.8000       8.9       111       906        95
VIS    2025250    183200   23.6500  146.7700       7.5        97       900        96
VIS    2025250    183200   23.6500  146.7400       9.4       109       905        95
VIS    2025250    183200   23.6600  146.7100       9.6       112       931        93
VIS    2025250    183200   23.6600  146.6800       9.2       111       938        91
VIS    2025250    183200   23.6400  146.6500       9.6       109       927        90
VIS    2025250    183200   23.6500  146.6000       8.6       107       941        91
VIS    2025250    183200   23.6400  146.5900       8.8       109       943        93
VIS    2025250    183200   23.6400  146.5500       8.4       106       944        95
VIS    2025250    183200   23.6600  146.5300       8.8       104       949        94
VIS    2025250    183200   23.6400  146.5000       8.8       102       955        96
VIS    2025250    183200   23.6600  146.4900       9.7       101       966        96
VIS    2025250    183200   23.6600  146.4700       9.3       100       986        95
VIS    2025250    183200   23.6600  146.4300       8.9        96       982        97
VIS    2025250    183200   23.6400  145.8700      11.4        86       949        92
VIS    2025250    183200   23.6400  145.8600      11.4        86       949        94
VIS    2025250    183200   23.6500  145.8200      11.1        87       914        96
VIS    2025250    183200   23.6400  145.8000      11.6        88       905        96
VIS    2025250    183200   23.6600  145.7700      12.0        90       900        95
VIS    2025250    183200   23.6500  145.7600      12.1        91       900        96
VIS    2025250    183200   23.6500  145.7300      12.0        92       899        98
VIS    2025250    183200   23.6300  145.6900      11.1        90       900        99
VIS    2025250    183200   23.6400  145.6800      10.7        90       899        99
VIS    2025250    183200   23.6500  145.6600      10.1        89       898        96
VIS    2025250    183200   23.6500  145.6300      10.1        93       898        92
VIS    2025250    183200   23.6400  145.5900      10.7        95       899        96
VIS    2025250    183200   23.6400  145.5800      10.9        96       900        97
VIS    2025250    183200   23.6300  145.5400      10.4        94       901        99
VIS    2025250    183200   23.6400  145.5300      10.1        92       903        99
VIS    2025250    183200   23.6400  145.4900      10.5        90       926       100
VIS    2025250    183200   23.6300  145.4800      10.6        89       926       100
VIS    2025250    183200   23.6400  145.4100      10.3        86       996       100
VIS    2025250    183200   23.6300  145.4100      10.4        86       990        99
VIS    2025250    183200   23.6300  145.3600      11.4        90       967        95
VIS    2025250    183200   23.6300  145.3500      11.4        92       958        96
VIS    2025250    183200   23.6500  145.3300      10.3        94       977        99
VIS    2025250    183200   23.6300  145.3000      10.3        95       933        96
VIS    2025250    183200   23.6500  145.1200      10.1        94       932        95
VIS    2025250    183200   23.6300  145.1000      10.5        93       978        98
VIS    2025250    183200   23.6300  145.0600      10.3        88       980        98
VIS    2025250    183200   23.6300  145.0300      10.1        91       957        98
VIS    2025250    183200   23.6300  145.0200      10.1        94       945        98
VIS    2025250    183200   23.6300  144.9800      10.4        97       910        95
VIS    2025250    183200   23.6300  144.9600      10.8       100       904        93
VIS    2025250    183200   23.6300  144.9300      10.6        97       902        91
VIS    2025250    183200   23.6500  144.9000      10.2        90       902        92
VIS    2025250    183200   23.6500  144.9000      10.1        89       902        92
VIS    2025250    183200   23.6500  144.8700      10.0        87       902        96
VIS    2025250    183200   23.6500  144.8400      10.1        86       902        99
VIS    2025250    183200   23.6300  144.8100       9.8        89       903        97
VIS    2025250    183200   23.6400  144.8000       9.4        89       904        96
VIS    2025250    183200   23.6400  144.7600       9.4        85       911        93
VIS    2025250    183200   23.6400  144.7300      10.1        85       923        94
VIS    2025250    183200   23.6400  144.7100       9.5        83       943        92
VIS    2025250    183200   23.6200  144.1200      10.1        90       999        90
VIS    2025250    183200   23.6300  144.0900      10.7        92       998        99
VIS    2025250    183200   23.6200  143.8700       9.9        89       990        99
VIS    2025250    183200   23.6200  143.8500       9.9        90       987       100
VIS    2025250    183200   23.6200  143.8100      10.1        95       993        99
VIS    2025250    183200   23.6200  143.7800      10.9        95       993        97
VIS    2025250    183200   23.6100  143.7500      11.4        91       998        98
VIS    2025250    183200   23.6100  143.7100      10.1        88       994        99
VIS    2025250    183200   23.6100  143.7000       9.9        89       983        99
VIS    2025250    183200   23.7100  151.6000       7.0        89       946        92
VIS    2025250    183200   23.7000  150.8900       7.3       106       917        96
VIS    2025250    183200   23.7000  150.8800       7.2       105       903        98
VIS    2025250    183200   23.6700  149.5500       6.7       106       961        90
VIS    2025250    183200   23.6700  149.5200       7.0       109       956        96
VIS    2025250    183200   23.6700  149.5100       7.2       109       935        97
VIS    2025250    183200   23.6600  149.4800       7.1       102       925        98
VIS    2025250    183200   23.6600  149.4600       7.2       101       918        96
VIS    2025250    183200   23.6600  149.4200      11.2       130       889        90
VIS    2025250    183200   23.6800  149.3600      10.2       125       854        93
VIS    2025250    183200   23.6700  149.3300      10.0       118       854        94
VIS    2025250    183200   23.6800  149.3000       9.2       119       851        91
VIS    2025250    183200   23.6500  147.7100       9.0        88       999        97
VIS    2025250    183200   23.6500  147.6900       8.8        87       989        98
VIS    2025250    183200   23.6500  147.6600       9.4        82       990        95
VIS    2025250    183200   23.6400  147.6300       9.4        83       967        97
VIS    2025250    183200   23.6500  147.6300       9.7        82       972        96
VIS    2025250    183200   23.6400  147.5800       9.4        88       938        98
VIS    2025250    183200   23.6400  147.5600       9.3        89       938        99
VIS    2025250    183200   23.6400  147.5400       9.3        88       948        99
VIS    2025250    183200   23.6400  147.5000       9.3        94       946        99
VIS    2025250    183200   23.6400  147.5000       9.5        95       944        99
VIS    2025250    183200   23.6500  147.4500      10.1        96       948        99
VIS    2025250    183200   23.6400  147.4300       9.4        91       923        97
VIS    2025250    183200   23.6400  147.4200       9.3        90       923        97
VIS    2025250    183200   23.6300  147.3900       9.4        85       912        98
VIS    2025250    183200   23.6300  147.3600       9.7        88       908        99
VIS    2025250    183200   23.6300  147.3200       9.3        89       956        99
VIS    2025250    183200   23.6300  147.3100       9.4        88       956        99
VIS    2025250    183200   23.6500  147.2900       9.4        92       987        97
VIS    2025250    183200   23.6300  147.2500      10.9       104       942        97
VIS    2025250    183200   23.6300  147.2300      10.5       104       942        97
VIS    2025250    183200   23.6300  147.2100       9.5        98       971        99
VIS    2025250    183200   23.6400  147.1700       9.3        89       978        99
VIS    2025250    183200   23.6200  147.1600       9.6        91       974        99
VIS    2025250    183200   23.6300  147.1200       9.6        95       973       100
VIS    2025250    183200   23.6300  147.1100       9.6        95       964       100
VIS    2025250    183200   23.6300  147.0800       9.8        95       938       100
VIS    2025250    183200   23.6400  147.0600       9.8        94       934       100
VIS    2025250    183200   23.6300  147.0200       9.7       106       917        93
VIS    2025250    183200   23.6400  147.0100       9.5       107       915        95
VIS    2025250    183200   23.6400  146.9900       9.0       102       910        96
VIS    2025250    183200   23.6200  146.9500       9.2       101       920        98
VIS    2025250    183200   23.6300  146.9200       9.9       100       940        98
VIS    2025250    183200   23.6400  146.8900       9.4       104       951        97
VIS    2025250    183200   23.6400  146.8800       9.2       105       951        97
VIS    2025250    183200   23.6400  146.8500       9.2       110       922        95
VIS    2025250    183200   23.6400  146.8200       9.9       114       908        93
VIS    2025250    183200   23.6400  146.8000       8.7       107       906        95
VIS    2025250    183200   23.6200  146.7700       7.9        97       904        96
VIS    2025250    183200   23.6200  146.7300       9.5       106       907        96
VIS    2025250    183200   23.6200  146.7200       9.6       107       910        97
VIS    2025250    183200   23.6400  146.6800       9.4       112       927        91
VIS    2025250    183200   23.6400  146.6800       9.4       111       927        92
VIS    2025250    183200   23.6200  146.6400       8.7        98       913        94
VIS    2025250    183200   23.6300  146.6100       8.7       104       923        95
VIS    2025250    183200   23.6300  146.6000       8.9       106       923        94
VIS    2025250    183200   23.6200  146.5700       8.7       109       919        95
VIS    2025250    183200   23.6300  146.5500       8.2       103       931        97
VIS    2025250    183200   23.6300  146.5000       8.2       102       943        96
VIS    2025250    183200   23.6300  146.5000       8.4       102       953        96
VIS    2025250    183200   23.6300  146.4700       8.6        99       953        93
VIS    2025250    183200   23.6200  146.4500       9.2        96       953        97
VIS    2025250    183200   23.6200  145.8800      11.6        89       940        97
VIS    2025250    183200   23.6300  145.8700      11.5        87       949        95
VIS    2025250    183200   23.6100  145.8300      11.4        87       924        98
VIS    2025250    183200   23.6100  145.8000      11.1        88       910        97
VIS    2025250    183200   23.6100  145.7900      11.1        89       909        97
VIS    2025250    183200   23.6300  145.7600      12.1        93       900        95
VIS    2025250    183200   23.6200  145.7500      12.0        94       900        98
VIS    2025250    183200   23.6100  145.7100      11.0        90       901        99
VIS    2025250    183200   23.6200  145.6800      10.8        90       903        99
VIS    2025250    183200   23.6300  145.6700      10.3        90       901        96
VIS    2025250    183200   23.6100  145.6200      10.3        88       900        99
VIS    2025250    183200   23.6100  145.6000      11.2        92       901        99
VIS    2025250    183200   23.6100  145.5700      11.7        95       901        98
VIS    2025250    183200   23.6100  145.5600      11.4        95       902        98
VIS    2025250    183200   23.6300  145.5400      10.4        93       902        99
VIS    2025250    183200   23.6200  145.5100      10.3        90       905        99
VIS    2025250    183200   23.6300  145.4800      10.6        89       927        99
VIS    2025250    183200   23.6300  145.4100      10.4        85       990       100
VIS    2025250    183200   23.6200  145.3800      11.1        87       987        97
VIS    2025250    183200   23.6100  145.3400      11.4        93       958        94
VIS    2025250    183200   23.6200  145.3400      11.3        94       954        94
VIS    2025250    183200   23.6100  145.3000      10.5        93       924        94
VIS    2025250    183200   23.6200  145.2800       9.7        91       929        93
VIS    2025250    183200   23.6000  145.2400       9.9        88       950        99
VIS    2025250    183200   23.6200  145.2100      10.7        92       950        98
VIS    2025250    183200   23.6200  145.1900      10.8        95       948        91
VIS    2025250    183200   23.6200  145.1200      10.2        94       978        98
VIS    2025250    183200   23.6200  145.0900      10.4        92       980        99
VIS    2025250    183200   23.6200  145.0700      10.2        88       980        99
VIS    2025250    183200   23.6100  145.0400      10.3        89       957        98
VIS    2025250    183200   23.6200  145.0200      10.3        93       945        97
VIS    2025250    183200   23.6100  145.0000      10.9        95       920        96
VIS    2025250    183200   23.6200  144.9700      10.9       101       904        92
VIS    2025250    183200   23.6200  144.9600      11.1       101       902        94
VIS    2025250    183200   23.6200  144.9300      10.4        98       901        95
VIS    2025250    183200   23.6000  144.9100       9.9        92       900       100
VIS    2025250    183200   23.6000  144.8600       9.4        90       901        99
VIS    2025250    183200   23.6000  144.8500       9.5        91       901        99
VIS    2025250    183200   23.6200  144.8300       9.9        89       901        99
VIS    2025250    183200   23.6200  144.8000       9.2        87       903        96
VIS    2025250    183200   23.6200  144.7600       8.9        83       905        91
VIS    2025250    183200   23.6200  144.7600       8.9        83       905        91
VIS    2025250    183200   23.6000  144.7300       8.3        80       905        92
VIS    2025250    183200   23.6100  143.9200       9.4        92       995        98
VIS    2025250    183200   23.5900  143.9000      10.1        90       991       100
VIS    2025250    183200   23.5900  143.8600      10.2        91       973       100
VIS    2025250    183200   23.5900  143.8400      10.1        92       971       100
VIS    2025250    183200   23.5900  143.8000      10.3        92       975       100
VIS    2025250    183200   23.6000  143.7600      11.3        94       998        99
VIS    2025250    183200   23.6100  143.7400      10.9        90       998       100
VIS    2025250    183200   23.5900  143.7100      10.4        89       955       100
VIS    2025250    183200   23.6000  143.6900      10.0        90       969        99
VIS    2025250    183200   23.6800  151.6400       7.3        91       997        94
VIS    2025250    183200   23.6700  150.9200       6.8       100       917        97
VIS    2025250    183200   23.6500  150.8900       6.4       104       906        99
VIS    2025250    183200   23.6500  150.8600       6.2       105       938        96
VIS    2025250    183200   23.6300  149.5800       6.6       107       986        94
VIS    2025250    183200   23.6300  149.5600       6.8       109       955        95
VIS    2025250    183200   23.6500  149.5200       6.8       107       939        95
VIS    2025250    183200   23.6500  149.5200       7.0       108       929        92
VIS    2025250    183200   23.6500  149.4300      10.5       126       895        92
VIS    2025250    183200   23.6300  147.7300       9.4        91       999        93
VIS    2025250    183200   23.6100  147.6800       8.9        88       995        98
VIS    2025250    183200   23.6100  147.6700       8.9        87       967        98
VIS    2025250    183200   23.6100  147.6500       9.2        88       964        99
VIS    2025250    183200   23.6100  147.6300       9.4        87       951        99
VIS    2025250    183200   23.6000  147.6000       9.7        90       923        99
VIS    2025250    183200   23.6100  147.5700       9.4        91       909        99
VIS    2025250    183200   23.6100  147.5300       9.6        94       933        99
VIS    2025250    183200   23.6200  147.5200       9.5        94       929        98
VIS    2025250    183200   23.6100  147.5000       9.8        97       912        96
VIS    2025250    183200   23.6200  147.4800       9.7        99       912        98
VIS    2025250    183200   23.6200  147.4500      10.0        94       836        92
VIS    2025250    183200   23.6200  147.4000       9.6        86       911        97
VIS    2025250    183200   23.6100  147.3800       9.9        87       839        92
VIS    2025250    183200   23.6200  147.3600      10.0        89       908        99
VIS    2025250    183200   23.6000  147.3500      10.0        95       832        90
VIS    2025250    183200   23.6200  147.3200       9.4        90       956       100
VIS    2025250    183200   23.6100  147.2900       9.7        91       942       100
VIS    2025250    183200   23.6100  147.2500      10.9       103       940        97
VIS    2025250    183200   23.6200  147.2400      10.7       103       940        97
VIS    2025250    183200   23.6100  147.2000       9.3        94       953        99
VIS    2025250    183200   23.6200  147.1700       9.3        89       974        99
VIS    2025250    183200   23.6200  147.1600       9.5        91       974       100
VIS    2025250    183200   23.6100  147.1300       9.5        95       964       100
VIS    2025250    183200   23.6100  147.1000       9.8        95       949        99
VIS    2025250    183200   23.6100  147.0800       9.9        96       938        99
VIS    2025250    183200   23.6000  147.0600      10.1        97       929        96
VIS    2025250    183200   23.6000  147.0000       9.7       104       911        94
VIS    2025250    183200   23.6100  146.9800       9.4       106       917        95
VIS    2025250    183200   23.6000  146.9400      10.1       106       918        96
VIS    2025250    183200   23.6000  146.9300      10.1       106       918        94
VIS    2025250    183200   23.6000  146.9000      10.2       108       917        91
VIS    2025250    183200   23.6000  146.8700       9.1       111       916        91
VIS    2025250    183200   23.5900  146.8500       9.2       113       914        90
VIS    2025250    183200   23.6000  146.7900       8.8       107       907        95
VIS    2025250    183200   23.5900  146.7700       9.4       101       906        98
VIS    2025250    183200   23.6100  146.7400       9.5       105       907        96
VIS    2025250    183200   23.6100  146.7300       9.6       105       907        97
VIS    2025250    183200   23.6000  146.6900       8.6        96       910        95
VIS    2025250    183200   23.6000  146.6800       8.5        96       910        96
VIS    2025250    183200   23.5900  146.6400       8.5        93       903        93
VIS    2025250    183200   23.6100  146.6300       8.7        95       911        95
VIS    2025250    183200   23.6000  146.6000       9.2       104       905        92
VIS    2025250    183200   23.6100  146.5600       8.5       105       915        97
VIS    2025250    183200   23.6100  146.5500       8.2       101       919        97
VIS    2025250    183200   23.5900  146.5100       8.5        99       917        97
VIS    2025250    183200   23.6100  146.4800       8.7       101       942        93
VIS    2025250    183200   23.6100  146.4700       8.9        98       942        94
VIS    2025250    183200   23.5900  146.4300       9.3        89       943        99
VIS    2025250    183200   23.5800  145.8800      11.9        91       926        98
VIS    2025250    183200   23.5800  145.8700      11.9        92       942        97
VIS    2025250    183200   23.6000  145.8400      11.6        88       942        98
VIS    2025250    183200   23.6000  145.8100      11.2        88       918        98
VIS    2025250    183200   23.6000  145.7900      11.1        91       910        97
VIS    2025250    183200   23.5800  145.7500      10.7        92       899        99
VIS    2025250    183200   23.5800  145.7400      10.9        91       899        98
VIS    2025250    183200   23.5900  145.7000      10.5        90       904        99
VIS    2025250    183200   23.5900  145.6900      10.3        91       909        98
VIS    2025250    183200   23.5900  145.6700      10.3        88       910        94
VIS    2025250    183200   23.6000  145.6200      10.7        86       902        99
VIS    2025250    183200   23.5900  145.6000      11.0        89       903        99
VIS    2025250    183200   23.5900  145.5700      11.7        93       903        98
VIS    2025250    183200   23.5900  145.5600      11.8        93       903        98
VIS    2025250    183200   23.5900  145.5300      11.1        95       906        98
VIS    2025250    183200   23.6000  145.5000      10.3        95       906        93
VIS    2025250    183200   23.6000  145.4900      10.1        93       926        93
VIS    2025250    183200   23.5800  145.4500       9.5        85       961        97
VIS    2025250    183200   23.5900  145.4200       9.8        85       969        97
VIS    2025250    183200   23.6000  145.3900      10.5        84       980        95
VIS    2025250    183200   23.5800  145.3700      11.0        90       977        98
VIS    2025250    183200   23.5800  145.3500      11.3        90       977        96
VIS    2025250    183200   23.5900  145.3200      11.2        94       933        96
VIS    2025250    183200   23.6000  145.3100      11.1        94       924        96
VIS    2025250    183200   23.5800  145.2800      10.2        90       906        98
VIS    2025250    183200   23.5900  145.2300      10.2        87       932        96
VIS    2025250    183200   23.5800  145.1900      10.8        86       981        99
VIS    2025250    183200   23.5800  145.1600      11.2        92       981        97
VIS    2025250    183200   23.5800  145.1400      10.6        95       958        97
VIS    2025250    183200   23.6000  145.1000      10.2        89       978        99
VIS    2025250    183200   23.5700  145.0600      11.3        87       961        98
VIS    2025250    183200   23.5900  145.0400      10.8        87       957        98
VIS    2025250    183200   23.5900  145.0200      11.0        90       923        98
VIS    2025250    183200   23.5900  145.0100      11.3        94       920        96
VIS    2025250    183200   23.5900  144.9800      11.4        99       904        92
VIS    2025250    183200   23.5800  144.9400      11.2        99       901        97
VIS    2025250    183200   23.5900  144.9200      10.5        97       900        99
VIS    2025250    183200   23.5800  144.8900      10.1        96       900        99
VIS    2025250    183200   23.5700  144.8700       9.6        97       901        97
VIS    2025250    183200   23.5800  144.8400       9.3        94       901        94
VIS    2025250    183200   23.5900  144.8100       8.7        92       901        93
VIS    2025250    183200   23.5900  144.8000       8.8        91       901        94
VIS    2025250    183200   23.5900  144.7700       8.1        83       903        92
VIS    2025250    183200   23.5600  143.9200      10.0        88       999        98
VIS    2025250    183200   23.5600  143.9000      10.2        90       983        99
VIS    2025250    183200   23.5800  143.8700      10.4        91       978       100
VIS    2025250    183200   23.5600  143.8300      10.3        92       964        99
VIS    2025250    183200   23.5600  143.7800      10.5        92       971        95
VIS    2025250    183200   23.5700  143.7700      10.5        93       975        98
VIS    2025250    183200   23.5600  143.7200      10.4        91       955       100
VIS    2025250    183200   23.5600  143.7200      10.5        92       955        98
VIS    2025250    183200   23.5700  143.6900      10.4        91       930        97
VIS    2025250    183200   23.5600  143.6500       9.6        95       926        97
VIS    2025250    183200   23.5700  143.6400       9.2        92       963        95
VIS    2025250    183200   23.6600  151.7100       6.9        90       989        93
VIS    2025250    183200   23.6400  151.6900       7.8        87       989        93
VIS    2025250    183200   23.6400  151.6500       8.0        86       958        93
VIS    2025250    183200   23.6500  151.6400       7.8        87       984        94
VIS    2025250    183200   23.6500  151.6000       7.1        91       925        98
VIS    2025250    183200   23.6500  151.5800       7.4        95       962        94
VIS    2025250    183200   23.6400  150.9700       7.9        94       913        94
VIS    2025250    183200   23.6400  150.9500       7.9        94       888        97
VIS    2025250    183200   23.6300  150.9100       7.4        95       859        97
VIS    2025250    183200   23.6500  150.8800       6.4       103       906        99
VIS    2025250    183200   23.6400  150.8500       6.5       100       906        98
VIS    2025250    183200   23.6200  149.5600       7.0       110       950        94
VIS    2025250    183200   23.6200  149.5500       7.5       113       950        91
VIS    2025250    183200   23.6000  149.4400      10.7       129       858        90
VIS    2025250    183200   23.6100  149.4100      10.9       129       858        90
VIS    2025250    183200   23.5800  147.7000       8.7        88       977        99
VIS    2025250    183200   23.5800  147.6800       9.2        88       963        99
VIS    2025250    183200   23.5800  147.6500       9.7        89       942        98
VIS    2025250    183200   23.5800  147.6500       9.8        90       921        98
VIS    2025250    183200   23.6000  147.6000       9.8        90       921        99
VIS    2025250    183200   23.5800  147.5900       9.7        91       913        99
VIS    2025250    183200   23.6000  147.5700       9.5        92       909        99
VIS    2025250    183200   23.5900  147.5300       9.7        97       915        96
VIS    2025250    183200   23.5900  147.5200       9.7        96       909        96
VIS    2025250    183200   23.6000  147.3500      10.2        94       832        90
VIS    2025250    183200   23.6000  147.3200       9.8        95       832        91
VIS    2025250    183200   23.6000  147.3000       9.8        93       830        92
VIS    2025250    183200   23.6000  147.2900       9.9        94       830        92
VIS    2025250    183200   23.5800  147.2200       9.7        92       903        97
VIS    2025250    183200   23.5700  147.2000       9.2        89       903        97
VIS    2025250    183200   23.5800  147.1800       9.0        88       953        94
VIS    2025250    183200   23.5800  147.1400       9.3        93       962        98
VIS    2025250    183200   23.5800  147.1300       9.5        93       962        99
VIS    2025250    183200   23.5900  147.1100       9.7        94       962        97
VIS    2025250    183200   23.5900  147.0700       9.9        96       937        95
VIS    2025250    183200   23.5900  147.0600      10.3        98       923        95
VIS    2025250    183200   23.5900  147.0100      10.2       103       911        92
VIS    2025250    183200   23.5700  147.0000      10.1       102       910        97
VIS    2025250    183200   23.5700  146.9600      10.2       103       918        95
VIS    2025250    183200   23.5700  146.9500      10.2       103       918        94
VIS    2025250    183200   23.5900  146.9300      10.1       105       918        94
VIS    2025250    183200   23.5900  146.9000      10.2       109       917        92
VIS    2025250    183200   23.5800  146.8600       9.3       112       914        90
VIS    2025250    183200   23.5700  146.7800      10.8       101       910        99
VIS    2025250    183200   23.5700  146.7500      10.4       100       910        95
VIS    2025250    183200   23.5700  146.7500      10.3       101       909        94
VIS    2025250    183200   23.5900  146.7300       9.5        99       907        96
VIS    2025250    183200   23.5800  146.6800       8.2        88       903        93
VIS    2025250    183200   23.5800  146.6500       8.2        92       902        93
VIS    2025250    183200   23.5900  146.6300       8.6        96       903        93
VIS    2025250    183200   23.5900  146.6200       8.7        99       903        92
VIS    2025250    183200   23.5900  146.5800       8.9       105       902        93
VIS    2025250    183200   23.5900  146.5700       8.3       103       903        96
VIS    2025250    183200   23.5900  146.5300       8.0        97       906        95
VIS    2025250    183200   23.5700  146.5100       8.6        98       903        97
VIS    2025250    183200   23.5800  146.5000       9.1       100       913        96
VIS    2025250    183200   23.5800  146.4500       8.8        94       917        97
VIS    2025250    183200   23.5800  146.4300       9.1        90       921        99
VIS    2025250    183200   23.5800  146.4100       9.7        86       943        99
VIS    2025250    183200   23.5600  146.3900      10.3        85       969        98
VIS    2025250    183200   23.5700  145.9000      11.7        87       922        97
VIS    2025250    183200   23.5800  145.8800      12.0        90       926        97
VIS    2025250    183200   23.5800  145.8700      11.9        91       942        97
VIS    2025250    183200   23.5800  145.8300      11.4        91       949        95
VIS    2025250    183200   23.5700  145.7700       8.9        97       899        92
VIS    2025250    183200   23.5800  145.7300      10.3        91       899        99
VIS    2025250    183200   23.5800  145.7200      10.3        90       901        99
VIS    2025250    183200   23.5800  145.6900       9.7        92       910        98
VIS    2025250    183200   23.5600  145.6600       9.6        86       923        96
VIS    2025250    183200   23.5800  145.6200      10.6        81       904        98
VIS    2025250    183200   23.5800  145.6000      10.7        87       904        98
VIS    2025250    183200   23.5600  145.5600      11.1        93       907        96
VIS    2025250    183200   23.5600  145.5400      10.8        95       918        95
VIS    2025250    183200   23.5700  145.4500       9.1        81       967        98
VIS    2025250    183200   23.5500  145.4200       9.9        81       967        99
VIS    2025250    183200   23.5600  145.4100       9.8        80       967        99
VIS    2025250    183200   23.5700  145.3700      11.0        90       978        99
VIS    2025250    183200   23.5500  145.3500      10.9        91       977        99
VIS    2025250    183200   23.5600  145.3200      11.0        89       941        99
VIS    2025250    183200   23.5700  145.3100      10.9        90       934        99
VIS    2025250    183200   23.5500  145.2400      10.5        90       970        90
VIS    2025250    183200   23.5600  145.1900      10.9        84       974        98
VIS    2025250    183200   23.5600  145.1900      11.0        84       974        98
VIS    2025250    183200   23.5500  145.1600      11.0        88       958        99
VIS    2025250    183200   23.5500  145.1300      10.4        94       929        95
VIS    2025250    183200   23.5700  145.1100      10.0        92       939        97
VIS    2025250    183200   23.5600  145.0700      11.8        89       961        97
VIS    2025250    183200   23.5500  145.0400      12.0        90       948        95
VIS    2025250    183200   23.5600  145.0200      11.4        89       923        98
VIS    2025250    183200   23.5500  145.0100      11.1        89       920        99
VIS    2025250    183200   23.5600  144.9800      11.1        95       904        99
VIS    2025250    183200   23.5500  144.9400      11.5        97       902        98
VIS    2025250    183200   23.5600  144.9200      11.6        97       902        97
VIS    2025250    183200   23.5500  144.9100      11.2        99       902        95
VIS    2025250    183200   23.5700  144.8700       9.9        98       901        95
VIS    2025250    183200   23.5600  144.8600       9.7        96       901        94
VIS    2025250    183200   23.5700  144.8300       8.9        95       901        93
VIS    2025250    183200   23.5500  144.7900       7.8        93       900        92
VIS    2025250    183200   23.5700  144.6700      10.1        78       953        95
VIS    2025250    183200   23.5400  144.6400      10.4        80       964        97
VIS    2025250    183200   23.5500  143.9200      10.0        87       999        98
VIS    2025250    183200   23.5500  143.8800      10.5        90       978        99
VIS    2025250    183200   23.5400  143.8600      10.7        91       958        99
VIS    2025250    183200   23.5600  143.7800      10.5        92       971        93
VIS    2025250    183200   23.5500  143.7300      10.0        93       966        96
VIS    2025250    183200   23.5600  143.7000      10.5        92       933        98
VIS    2025250    183200   23.5600  143.7000      10.6        92       932        97
VIS    2025250    183200   23.5600  143.6700      10.2        95       917        96
VIS    2025250    183200   23.5600  143.6400       9.5        95       926        98
VIS    2025250    183200   23.6400  151.6500       8.0        85       917        95
VIS    2025250    183200   23.6400  151.6400       7.9        85       917        95
VIS    2025250    183200   23.6400  151.6100       7.1        88       925        97
VIS    2025250    183200   23.6100  150.9800       7.5        91       913        93
VIS    2025250    183200   23.6200  150.9500       7.9        94       870        98
VIS    2025250    183200   23.6100  150.9400       8.0        94       870        98
VIS    2025250    183200   23.6200  150.8900       7.4        96       859        97
VIS    2025250    183200   23.5500  147.7200       9.1        89       943        99
VIS    2025250    183200   23.5600  147.7100       8.9        88       963        99
VIS    2025250    183200   23.5700  147.6800       9.1        88       958        99
VIS    2025250    183200   23.5600  147.6200      10.0        93       841        91
VIS    2025250    183200   23.5600  147.6100       9.9        93       841        92
VIS    2025250    183200   23.5600  147.5800       9.7        94       892        98
VIS    2025250    183200   23.5700  147.5600       9.7        96       909        97
VIS    2025250    183200   23.5500  147.4400       8.9       102       776        91
VIS    2025250    183200   23.5700  147.2400      10.0        97       889       100
VIS    2025250    183200   23.5500  147.2200       9.2       100       890        96
VIS    2025250    183200   23.5700  147.2000       9.1        90       903        97
VIS    2025250    183200   23.5700  147.1700       9.0        88       955        96
VIS    2025250    183200   23.5500  147.1500       9.4        90       962        97
VIS    2025250    183200   23.5600  147.1200       9.5        91       962        98
VIS    2025250    183200   23.5500  147.0900       9.6        92       925        96
VIS    2025250    183200   23.5600  147.0600       9.9        97       915        94
VIS    2025250    183200   23.5600  147.0300       9.9       103       904        94
VIS    2025250    183200   23.5600  147.0000       9.7       101       907        99
VIS    2025250    183200   23.5700  147.0000      10.0       102       910        98
VIS    2025250    183200   23.5600  146.9700      10.1       100       912        98
VIS    2025250    183200   23.5400  146.9400       9.8        96       897        93
VIS    2025250    183200   23.5500  146.9000       9.8       103       898        95
VIS    2025250    183200   23.5500  146.8900      10.0       107       901        93
VIS    2025250    183200   23.5600  146.8500       9.8       108       902        91
VIS    2025250    183200   23.5600  146.8500       9.7       109       906        91
VIS    2025250    183200   23.5400  146.8000      10.5       102       909        97
VIS    2025250    183200   23.5500  146.7700      10.6       100       910        98
VIS    2025250    183200   23.5600  146.7600      10.6       100       911        97
VIS    2025250    183200   23.5500  146.7400      10.0        99       909        92
VIS    2025250    183200   23.5600  146.6700       8.4        90       896        93
VIS    2025250    183200   23.5500  146.6300       9.3        97       898        99
VIS    2025250    183200   23.5400  146.5900       9.5        99       902        99
VIS    2025250    183200   23.5400  146.5900       9.5       100       902        99
VIS    2025250    183200   23.5400  146.5500       9.1       101       900        98
VIS    2025250    183200   23.5400  146.5200       9.1       101       901        97
VIS    2025250    183200   23.5500  146.5000       9.2        99       903        97
VIS    2025250    183200   23.5500  146.4800       9.6        98       905        98
VIS    2025250    183200   23.5500  146.4400       9.3        94       908        99
VIS    2025250    183200   23.5500  146.4400       9.3        93       909        99
VIS    2025250    183200   23.5400  146.4100       9.4        90       920        99
VIS    2025250    183200   23.5400  146.3800       9.6        89       965        99
VIS    2025250    183200   23.5400  145.9200      11.0        83       965        94
VIS    2025250    183200   23.5500  145.8900      11.9        87       959        94
VIS    2025250    183200   23.5500  145.6800       8.0        99       919        93
VIS    2025250    183200   23.5400  145.6700       8.4        94       923        92
VIS    2025250    183200   23.5400  145.6500      10.2        88       926        98
VIS    2025250    183200   23.5400  145.4700       8.4        90       968        98
VIS    2025250    183200   23.5400  145.4600       8.9        88       968        99
VIS    2025250    183200   23.5500  145.4200       9.6        82       967        97
VIS    2025250    183200   23.5500  145.4200      10.0        80       967        99
VIS    2025250    183200   23.5300  145.3700      11.1        90       963        99
VIS    2025250    183200   23.5300  145.3500      10.6        87       959        99
VIS    2025250    183200   23.5400  145.3200      10.7        88       941       100
VIS    2025250    183200   23.5500  145.2900       9.9        90       933        95
VIS    2025250    183200   23.5400  145.1700      10.8        85       971        98
VIS    2025250    183200   23.5300  145.1600      10.8        85       964        95
VIS    2025250    183200   23.5400  145.0700      12.5        90       981        95
VIS    2025250    183200   23.5400  145.0500      12.2        89       957        95
VIS    2025250    183200   23.5200  145.0200      10.9        88       941        99
VIS    2025250    183200   23.5400  145.0000      10.9        88       919        99
VIS    2025250    183200   23.5300  144.9700      10.6        90       905       100
VIS    2025250    183200   23.5200  144.9400      10.9        95       904        99
VIS    2025250    183200   23.5200  144.9400      10.9        96       905        99
VIS    2025250    183200   23.5200  144.8900      10.7        97       903        91
VIS    2025250    183200   23.5200  144.8800      10.6        97       902        90
VIS    2025250    183200   23.5200  144.8600      10.3        96       902        93
VIS    2025250    183200   23.5400  144.8200       9.0        91       901        98
VIS    2025250    183200   23.5200  144.8100       9.6        89       902       100
VIS    2025250    183200   23.5300  144.7800       8.9        89       902        99
VIS    2025250    183200   23.5400  144.7600       7.9        81       903        93
VIS    2025250    183200   23.5200  144.6900       9.1        73       908        90
VIS    2025250    183200   23.5200  144.6700       9.5        79       911        97
VIS    2025250    183200   23.5200  144.6600       9.8        81       918        99
VIS    2025250    183200   23.5200  143.9200      10.3        87       999        95
VIS    2025250    183200   23.5300  143.9100      10.4        88       983        97
VIS    2025250    183200   23.5200  143.8700      11.0        89       966        98
VIS    2025250    183200   23.5100  143.8500      11.1        90       955        99
VIS    2025250    183200   23.5300  143.8400      10.8        92       957        99
VIS    2025250    183200   23.5300  143.8100      10.5        93       961        96
VIS    2025250    183200   23.5100  143.7500       9.9        93       987        97
VIS    2025250    183200   23.5200  143.7300       9.5        92       975        97
VIS    2025250    183200   23.5300  143.7100       9.9        91       932        95
VIS    2025250    183200   23.5300  143.6900      10.2        92       919        97
VIS    2025250    183200   23.6100  151.6700       9.0        84       908        94
VIS    2025250    183200   23.6000  151.6200       8.3        82       860        99
VIS    2025250    183200   23.5700  149.3300       8.5       132       871        91
VIS    2025250    183200   23.5400  147.7800       9.2        89       965        99
VIS    2025250    183200   23.5300  147.7400       9.5        90       934       100
VIS    2025250    183200   23.5400  147.7200       9.3        91       934        99
VIS    2025250    183200   23.5400  147.7000       9.3        92       823        92
VIS    2025250    183200   23.5300  147.4600       9.7       105       777        91
VIS    2025250    183200   23.5500  147.4400       9.1       103       776        92
VIS    2025250    183200   23.5300  147.2300       9.0       104       890        91
VIS    2025250    183200   23.5300  147.2100       9.2       103       893        91
VIS    2025250    183200   23.5400  147.1800       9.4        95       928        97
VIS    2025250    183200   23.5200  147.1500       9.5        92       954        96
VIS    2025250    183200   23.5300  147.1300       9.7        91       962        92
VIS    2025250    183200   23.5300  147.1200       9.8        92       962        91
VIS    2025250    183200   23.5400  147.0700       9.9        96       918        94
VIS    2025250    183200   23.5200  147.0500      10.1       102       903        92
VIS    2025250    183200   23.5200  147.0300       9.9       102       901        94
VIS    2025250    183200   23.5300  147.0000       9.3        97       902        97
VIS    2025250    183200   23.5300  146.9800       9.4        94       901        96
VIS    2025250    183200   23.5200  146.9500       9.5        93       894        95
VIS    2025250    183200   23.5400  146.9300       9.8        96       897        94
VIS    2025250    183200   23.5400  146.9100       9.8        98       897        95
VIS    2025250    183200   23.5200  146.8900       9.6        96       894        98
VIS    2025250    183200   23.5400  146.8400      10.4       107       899        95
VIS    2025250    183200   23.5200  146.8200      10.4       101       905        98
VIS    2025250    183200   23.5300  146.8100      10.4       102       905        98
VIS    2025250    183200   23.5300  146.7900      10.2        98       909        95
VIS    2025250    183200   23.5400  146.7600      10.2        95       910        93
VIS    2025250    183200   23.5200  146.7100       9.6        93       895        95
VIS    2025250    183200   23.5200  146.7000       9.4        94       895        92
VIS    2025250    183200   23.5100  146.6600       9.7        89       895        97
VIS    2025250    183200   23.5400  146.6600       9.3        92       896        98
VIS    2025250    183200   23.5300  146.6300       9.6        94       897       100
VIS    2025250    183200   23.5300  146.5900       9.5        99       902        99
VIS    2025250    183200   23.5200  146.5700       9.5       101       900        97
VIS    2025250    183200   23.5100  146.5600       9.3       102       900        97
VIS    2025250    183200   23.5300  146.5100       9.3       102       900        96
VIS    2025250    183200   23.5300  146.5000       9.4       100       901        96
VIS    2025250    183200   23.5200  146.4600       9.8        95       901        96
VIS    2025250    183200   23.5200  146.4400       9.7        93       905        98
VIS    2025250    183200   23.5200  146.4100       9.2        91       909        98
VIS    2025250    183200   23.5200  146.3800       9.3        88       925        98
VIS    2025250    183200   23.5100  146.3800       9.4        89       925        98
VIS    2025250    183200   23.5000  145.7500       8.7       102       838        92
VIS    2025250    183200   23.5100  145.4900       9.8        89       968       100
VIS    2025250    183200   23.5000  145.4500       9.6        91       961        99
VIS    2025250    183200   23.5000  145.4400       9.5        90       961        99
VIS    2025250    183200   23.5000  145.4100       9.5        87       962        99
VIS    2025250    183200   23.5200  145.3800      10.9        88       963        98
VIS    2025250    183200   23.5200  145.3500      10.6        87       959        98
VIS    2025250    183200   23.5200  145.3300      10.4        86       948        98
VIS    2025250    183200   23.5100  145.1000      10.5        90       999        91
VIS    2025250    183200   23.5000  145.0200      10.4        90       965        98
VIS    2025250    183200   23.5200  144.9900      10.5        87       910       100
VIS    2025250    183200   23.5200  144.9400      10.8        94       908        99
VIS    2025250    183200   23.5100  144.9300      10.8        94       908        98
VIS    2025250    183200   23.5100  144.8900      10.6        93       904        93
VIS    2025250    183200   23.5100  144.8800      10.6        95       904        93
VIS    2025250    183200   23.5000  144.8400      10.2        92       905        99
VIS    2025250    183200   23.5000  144.8100      10.0        89       905       100
VIS    2025250    183200   23.5000  144.8100      10.0        89       904       100
VIS    2025250    183200   23.5000  144.7500       9.9        86       904        99
VIS    2025250    183200   23.5000  143.8900      11.0        89       975        94
VIS    2025250    183200   23.4900  143.8700      11.1        89       966        94
VIS    2025250    183200   23.4900  143.8400      11.1        90       953        99
VIS    2025250    183200   23.5000  143.8300      11.2        91       955        99
VIS    2025250    183200   23.4900  143.8100      11.1        93       958        99
VIS    2025250    183200   23.5000  143.7700      10.5        92       987        99
VIS    2025250    183200   23.4800  143.7400      10.2        93       987        99
VIS    2025250    183200   23.4900  143.7300      10.0        93       980        98
VIS    2025250    183200   23.5000  143.6600      10.4        96       916        98
VIS    2025250    183200   23.5700  151.6400       8.5        85       862        96
VIS    2025250    183200   23.5700  151.6200       8.0        85       882        99
VIS    2025250    183200   23.5700  151.6000       7.3        88       882        98
VIS    2025250    183200   23.5500  150.8300       7.2        97       903        91
VIS    2025250    183200   23.5700  150.8300       7.2       100       920        95
VIS    2025250    183200   23.5300  149.7600       9.2       115       969        90
VIS    2025250    183200   23.5400  149.7400       8.4       109       969        91
VIS    2025250    183200   23.5300  149.7200       8.7       113       969        91
VIS    2025250    183200   23.5400  149.4600      11.5       129       861        90
VIS    2025250    183200   23.5300  149.4300       8.2       120       853        98
VIS    2025250    183200   23.5300  149.4200       7.5       116       853        98
VIS    2025250    183200   23.5200  149.1200       8.0       108       982        92
VIS    2025250    183200   23.5100  147.8700       8.3        80       998        95
VIS    2025250    183200   23.5200  147.8600       8.6        81       998        96
VIS    2025250    183200   23.5100  147.8200       9.3        89       983        99
VIS    2025250    183200   23.5100  147.7900       9.0        91       964        99
VIS    2025250    183200   23.5000  147.7700       9.1        90       943        99
VIS    2025250    183200   23.5000  147.7400       9.6        91       916        99
VIS    2025250    183200   23.5000  147.7300       9.8        93       814        90
VIS    2025250    183200   23.5000  147.2400       9.1        96       892        94
VIS    2025250    183200   23.5100  147.2100       9.3       100       893        92
VIS    2025250    183200   23.5200  147.1800       9.4        97       919        95
VIS    2025250    183200   23.5100  147.1600       9.6        96       936        97
VIS    2025250    183200   23.4900  147.0700      10.3        99       903        96
VIS    2025250    183200   23.5100  147.0500      10.3       101       902        95
VIS    2025250    183200   23.5000  147.0200      10.3       100       900        96
VIS    2025250    183200   23.5100  147.0000       9.6        97       899        96
VIS    2025250    183200   23.5100  146.9800       9.6        94       895        96
VIS    2025250    183200   23.5100  146.9600       9.5        93       894        96
VIS    2025250    183200   23.5100  146.9100       9.4        93       894        98
VIS    2025250    183200   23.5100  146.8900       9.4        92       893        99
VIS    2025250    183200   23.5100  146.8800       9.5        94       894        99
VIS    2025250    183200   23.5000  146.8400       9.9        97       896        98
VIS    2025250    183200   23.4900  146.8300       9.8        96       896        98
VIS    2025250    183200   23.5100  146.7900       9.6        95       905        92
VIS    2025250    183200   23.5000  146.7800       9.4        91       895        92
VIS    2025250    183200   23.5100  146.7400       9.8        90       898        94
VIS    2025250    183200   23.5100  146.7200       9.8        93       896        97
VIS    2025250    183200   23.5100  146.6900       9.5        93       895        98
VIS    2025250    183200   23.4900  146.6000       9.6        95       897        97
VIS    2025250    183200   23.5000  146.5900       9.3        97       899        98
VIS    2025250    183200   23.5000  146.5600       9.2       101       899        98
VIS    2025250    183200   23.5100  146.5500       9.2       102       899        98
VIS    2025250    183200   23.5100  146.4800       9.4        92       900        94
VIS    2025250    183200   23.5000  146.3500      10.2        90       965        90
VIS    2025250    183200   23.4800  146.3000      10.4        87       955        92
VIS    2025250    183200   23.4800  145.6500       9.5        89       929        90
VIS    2025250    183200   23.4900  145.6100      10.3        84       980        93
VIS    2025250    183200   23.4900  145.5800       9.0        75       994        95
VIS    2025250    183200   23.4800  145.5500      10.1        81       984        99
VIS    2025250    183200   23.4800  145.5500      10.2        82       984        99
VIS    2025250    183200   23.4800  145.5200      10.7        87       983        94
VIS    2025250    183200   23.4800  145.4800      10.5        97       961        97
VIS    2025250    183200   23.4700  145.4500       9.8        93       929        97
VIS    2025250    183200   23.4700  145.4400       9.5        92       935        97
VIS    2025250    183200   23.4700  145.2500      11.2        94       994        97
VIS    2025250    183200   23.4800  145.2300      10.8        89       972        99
VIS    2025250    183200   23.4800  145.2200      10.7        89       972        98
VIS    2025250    183200   23.4900  145.0700      10.8        94       999        96
VIS    2025250    183200   23.4700  145.0500      10.6        90       946        97
VIS    2025250    183200   23.4700  145.0200      10.5        89       944        99
VIS    2025250    183200   23.4800  145.0000      10.4        88       944        99
VIS    2025250    183200   23.4900  144.9700      10.7        87       937        99
VIS    2025250    183200   23.4900  144.9600      10.8        87       933        99
VIS    2025250    183200   23.4900  144.9200      10.9        87       910        98
VIS    2025250    183200   23.4800  144.9100      10.9        86       910        98
VIS    2025250    183200   23.4700  143.9000      10.7        92       975        90
VIS    2025250    183200   23.4800  143.8700      11.0        88       966        95
VIS    2025250    183200   23.4800  143.8500      11.1        89       953        99
VIS    2025250    183200   23.4700  143.8400      11.1        91       953        99
VIS    2025250    183200   23.4600  143.8100      11.3        94       953        98
VIS    2025250    183200   23.4700  143.7800      11.0        93       958        98
VIS    2025250    183200   23.4600  143.7600      10.3        93       951        98
VIS    2025250    183200   23.4800  143.7300      10.0        92       980        99
VIS    2025250    183200   23.4600  143.7100      10.0        93       971        98
VIS    2025250    183200   23.4700  143.6800      10.0        94       963        99
VIS    2025250    183200   23.4700  143.6600      10.3        96       960        97
VIS    2025250    183200   23.4500  143.0100      10.5        99       995        98
VIS    2025250    183200   23.5600  151.6500       8.8        85       916        90
VIS    2025250    183200   23.5500  151.6200       7.4        85       912        95
VIS    2025250    183200   23.5400  151.5800       7.5        96       896        97
VIS    2025250    183200   23.5200  149.7400       9.0       113       940        95
VIS    2025250    183200   23.5200  149.7200       9.4       115       955        91
VIS    2025250    183200   23.5100  149.7100       9.8       116       955        90
VIS    2025250    183200   23.5100  149.5100      12.6       124       887        90
VIS    2025250    183200   23.5000  149.4800      11.4       121       865        93
VIS    2025250    183200   23.5000  149.4800      11.2       121       862        93
VIS    2025250    183200   23.5100  149.4500       9.8       124       857        95
VIS    2025250    183200   23.5200  149.4200       7.3       115       855        97
VIS    2025250    183200   23.5100  149.2700       6.4       120       857        90
VIS    2025250    183200   23.5200  149.1200       8.2       106       982        90
VIS    2025250    183200   23.4800  147.8900       8.8        79       995        94
VIS    2025250    183200   23.4800  147.8700       8.4        84       995        97
VIS    2025250    183200   23.4800  147.8500       8.8        87       973        98
VIS    2025250    183200   23.4800  147.8100       9.3        92       943       100
VIS    2025250    183200   23.4800  147.8000       9.2        94       943       100
VIS    2025250    183200   23.4800  147.7600       9.3        93       901        98
VIS    2025250    183200   23.5000  147.7400       9.7        91       901        98
VIS    2025250    183200   23.4900  147.4100       9.5       104       773        90
VIS    2025250    183200   23.4800  147.3000       9.7       101       785        90
VIS    2025250    183200   23.4700  147.2500       9.6        94       892        99
VIS    2025250    183200   23.4900  147.2300       9.4        93       892        98
VIS    2025250    183200   23.4700  147.2200       9.6        93       896        99
VIS    2025250    183200   23.4700  147.1800       9.8        97       909        98
VIS    2025250    183200   23.4900  147.1600       9.7        97       936        95
VIS    2025250    183200   23.4900  147.1400      10.2        94       949        91
VIS    2025250    183200   23.4700  147.0900      10.7        96       907        99
VIS    2025250    183200   23.4900  147.0700      10.3        99       903        96
VIS    2025250    183200   23.4700  147.0500      10.4       100       899        95
VIS    2025250    183200   23.4700  147.0300      10.4       100       899        95
VIS    2025250    183200   23.4900  147.0100      10.2        98       896        96
VIS    2025250    183200   23.4700  146.9700       9.5        91       894        98
VIS    2025250    183200   23.4700  146.9500       9.5        90       894        97
VIS    2025250    183200   23.4700  146.9200       9.5        87       894        98
VIS    2025250    183200   23.4700  146.9100       9.4        87       893        98
VIS    2025250    183200   23.4800  146.8800       9.4        89       893        98
VIS    2025250    183200   23.4800  146.8400       9.6        94       895        98
VIS    2025250    183200   23.4900  146.8300       9.7        95       896        98
VIS    2025250    183200   23.4700  146.8100       9.5        92       892        95
VIS    2025250    183200   23.4700  146.7800       9.3        87       892        92
VIS    2025250    183200   23.4600  146.7600       9.3        85       892        92
VIS    2025250    183200   23.4600  146.7200       9.4        93       895        96
VIS    2025250    183200   23.4700  146.6900       9.5        96       894        97
VIS    2025250    183200   23.4700  146.6600       9.3        97       895        97
VIS    2025250    183200   23.4600  146.6500       9.2        97       895        96
VIS    2025250    183200   23.4600  146.6100       9.4        97       896        97
VIS    2025250    183200   23.4600  146.6000       9.4        98       896        96
VIS    2025250    183200   23.4700  146.4800       9.4        90       897        93
VIS    2025250    183200   23.4700  146.4500       9.6        91       899        91
VIS    2025250    183200   23.4800  146.4000       9.4        90       902        92
VIS    2025250    183200   23.4800  146.3900       9.4        91       905        91
VIS    2025250    183200   23.4600  146.3700       9.4        92       913        91
VIS    2025250    183200   23.4600  146.3300      10.3        93       962        92
VIS    2025250    183200   23.4600  146.3200      10.3        93       962        92
VIS    2025250    183200   23.4700  146.2800      10.0        89       969        96
VIS    2025250    183200   23.4600  146.2700       9.1        94       969        91
VIS    2025250    183200   23.4600  145.6800      10.9        91       912        95
VIS    2025250    183200   23.4600  145.6500       9.9        87       948        94
VIS    2025250    183200   23.4600  145.6200       9.9        80       973        98
VIS    2025250    183200   23.4700  145.6000       9.9        80       988        98
VIS    2025250    183200   23.4500  145.5700      10.1        86       967        99
VIS    2025250    183200   23.4500  145.5600      10.2        86       969        99
VIS    2025250    183200   23.4500  145.5200      10.5        88       969        99
VIS    2025250    183200   23.4500  145.4900      10.6        93       933        99
VIS    2025250    183200   23.4700  145.4800      10.6        97       933        97
VIS    2025250    183200   23.4700  145.4400       9.3        90       935        97
VIS    2025250    183200   23.4700  145.4300       9.2        89       935        96
VIS    2025250    183200   23.4500  145.3000      11.7        92       999        91
VIS    2025250    183200   23.4500  145.2600      11.2        93       983        99
VIS    2025250    183200   23.4500  145.2300      11.6        91       958        97
VIS    2025250    183200   23.4600  145.2300      11.5        92       958        98
VIS    2025250    183200   23.4700  145.2100      11.4        90       958        97
VIS    2025250    183200   23.4500  145.1600      11.6        94       983        94
VIS    2025250    183200   23.4600  145.0600      10.5        90       946        96
VIS    2025250    183200   23.4500  145.0500      10.5        89       946        97
VIS    2025250    183200   23.4700  145.0100      10.6        88       937        99
VIS    2025250    183200   23.4600  144.9800      10.7        86       946        99
VIS    2025250    183200   23.4600  144.9800      10.7        86       946        99
VIS    2025250    183200   23.4500  144.9300      10.6        83       952        99
VIS    2025250    183200   23.4400  144.9000      10.6        84       937        99
VIS    2025250    183200   23.4500  144.8900      10.5        84       911        96
VIS    2025250    183200   23.4500  144.8600      10.7        88       907        97
VIS    2025250    183200   23.4400  144.8300      10.9        92       907        97
VIS    2025250    183200   23.4400  144.8200      11.0        94       909        96
VIS    2025250    183200   23.4400  144.7800      10.4        91       908        97
VIS    2025250    183200   23.4600  144.7700      10.2        89       907        94
VIS    2025250    183200   23.4600  144.7400      10.0        90       906        92
VIS    2025250    183200   23.4600  144.7000      10.0        90       906        92
VIS    2025250    183200   23.4600  144.6800      10.5        90       911        97
VIS    2025250    183200   23.4300  143.9000      11.1        94       975        99
VIS    2025250    183200   23.4300  143.8600      11.2        91       975        99
VIS    2025250    183200   23.4400  143.8300      11.5        93       953        97
VIS    2025250    183200   23.4300  143.8100      11.7        97       933        97
VIS    2025250    183200   23.4400  143.7900      11.5        96       926        97
VIS    2025250    183200   23.4400  143.7700      10.5        95       922        98
VIS    2025250    183200   23.4400  143.7500       9.8        92       926        99
VIS    2025250    183200   23.4500  143.7100       9.9        92       971        98
VIS    2025250    183200   23.4300  143.6800       9.4        90       974        97
VIS    2025250    183200   23.4500  143.6600       9.9        93       969        98
VIS    2025250    183200   23.4300  143.1100      10.2        90       996        99
VIS    2025250    183200   23.4300  143.0600      10.4        87       998        99
VIS    2025250    183200   23.4300  143.0200      10.7        96       995        98
VIS    2025250    183200   23.4300  143.0100      10.6        96       995        98
VIS    2025250    183200   23.4300  142.9900      10.1        97       991        99
VIS    2025250    183200   23.4300  142.9600       9.6        95       991        99
VIS    2025250    183200   23.4300  142.9300       9.5        96       991        99
VIS    2025250    183200   23.4300  142.8800       9.3        97       999        97
VIS    2025250    183200   23.5200  151.6400       8.2        78       937        91
VIS    2025250    183200   23.5200  151.6100       7.7        85       896        98
VIS    2025250    183200   23.5200  151.6100       7.8        85       890        98
VIS    2025250    183200   23.5300  151.5800       7.5        93       896        96
VIS    2025250    183200   23.4900  149.3800       7.7       105       883        90
VIS    2025250    183200   23.4600  147.8800       8.0        85       995        97
VIS    2025250    183200   23.4700  147.8600       8.7        85       973        97
VIS    2025250    183200   23.4600  147.8500       8.6        87       962        98
VIS    2025250    183200   23.4600  147.8100       9.1        94       925        99
VIS    2025250    183200   23.4600  147.7800       9.3        97       901        97
VIS    2025250    183200   23.4600  147.7700       9.2        96       899        98
VIS    2025250    183200   23.4600  147.3400       9.5       109       785        92
VIS    2025250    183200   23.4600  147.3200       8.7       106       830        98
VIS    2025250    183200   23.4500  147.3100       8.5       105       788        94
VIS    2025250    183200   23.4400  147.2700       8.9        99       840        98
VIS    2025250    183200   23.4500  147.2600       9.3        96       850        97
VIS    2025250    183200   23.4500  147.2300       9.7        95       898        99
VIS    2025250    183200   23.4500  147.1900       9.6        95       907        98
VIS    2025250    183200   23.4600  147.1700      10.0        96       912        96
VIS    2025250    183200   23.4400  147.1400       9.9        88       957        93
VIS    2025250    183200   23.4400  147.1200      10.3        87       957        96
VIS    2025250    183200   23.4500  147.1000      10.6        93       909        99
VIS    2025250    183200   23.4600  147.0600      10.3        98       900        97
VIS    2025250    183200   23.4500  147.0400      10.2        97       899        97
VIS    2025250    183200   23.4600  147.0100      10.2        96       895        98
VIS    2025250    183200   23.4600  147.0000      10.0        93       895        99
VIS    2025250    183200   23.4400  146.9600       9.4        85       894        97
VIS    2025250    183200   23.4500  146.9500       9.5        83       894        96
VIS    2025250    183200   23.4500  146.9300       9.6        84       894        96
VIS    2025250    183200   23.4500  146.8800       9.5        89       893        98
VIS    2025250    183200   23.4500  146.8700       9.4        89       893        98
VIS    2025250    183200   23.4600  146.8500       9.4        91       893        97
VIS    2025250    183200   23.4400  146.8200       9.6        92       890        97
VIS    2025250    183200   23.4600  146.7800       9.3        87       892        93
VIS    2025250    183200   23.4600  146.7700       9.3        85       892        94
VIS    2025250    183200   23.4600  146.7500       9.3        85       892        94
VIS    2025250    183200   23.4500  146.7000       9.1        95       895        94
VIS    2025250    183200   23.4600  146.6800       9.2        97       895        94
VIS    2025250    183200   23.4500  146.6500       9.1        97       895        95
VIS    2025250    183200   23.4500  146.6300       9.2        96       896        96
VIS    2025250    183200   23.4600  146.6000       9.4        98       896        96
VIS    2025250    183200   23.4400  146.5800       9.1        99       896        92
VIS    2025250    183200   23.4300  146.4500       9.3        91       898        98
VIS    2025250    183200   23.4500  146.4200       9.5        88       900        92
VIS    2025250    183200   23.4400  146.4000       9.3        85       900        94
VIS    2025250    183200   23.4400  146.3900       9.3        86       900        95
VIS    2025250    183200   23.4300  146.3700       9.1        86       910        95
VIS    2025250    183200   23.4300  146.3400       9.6        90       936        96
VIS    2025250    183200   23.4500  146.3100      10.4        96       962        94
VIS    2025250    183200   23.4400  145.6900      10.4        92       924        98
VIS    2025250    183200   23.4500  145.6800      10.6        91       924        97
VIS    2025250    183200   23.4400  145.6400       9.7        85       956        95
VIS    2025250    183200   23.4200  145.6200      10.9        85       948        99
VIS    2025250    183200   23.4200  145.5800      10.6        91       946       100
VIS    2025250    183200   23.4200  145.5600      10.6        90       945       100
VIS    2025250    183200   23.4200  145.5500      10.5        90       952       100
VIS    2025250    183200   23.4300  145.5200      10.5        88       958       100
VIS    2025250    183200   23.4300  145.5000      10.7        89       935       100
VIS    2025250    183200   23.4200  145.4800      11.1        90       923        99
VIS    2025250    183200   23.4400  145.4300       9.5        89       948        99
VIS    2025250    183200   23.4200  145.2700      11.2        91       958        99
VIS    2025250    183200   23.4400  145.2600      11.2        92       983        99
VIS    2025250    183200   23.4300  145.2300      11.6        91       958        97
VIS    2025250    183200   23.4400  145.2100      12.1        92       958        95
VIS    2025250    183200   23.4300  145.1800      11.9        93       971        96
VIS    2025250    183200   23.4300  145.0700      10.6        87       967        99
VIS    2025250    183200   23.4300  145.0500      10.5        87       946        99
VIS    2025250    183200   23.4200  145.0200      10.5        89       920        99
VIS    2025250    183200   23.4300  145.0000      10.8        88       917        98
VIS    2025250    183200   23.4300  144.9900      10.8        88       917        98
VIS    2025250    183200   23.4300  144.9500      10.7        85       946        99
VIS    2025250    183200   23.4300  144.9200      10.8        84       952        98
VIS    2025250    183200   23.4400  144.9000      10.6        84       937        99
VIS    2025250    183200   23.4200  144.8800      10.6        83       937        96
VIS    2025250    183200   23.4300  144.8500      10.8        86       909        97
VIS    2025250    183200   23.4300  144.8300      10.9        89       909        97
VIS    2025250    183200   23.4300  144.7900      10.6        92       910        97
VIS    2025250    183200   23.4300  144.7700      10.4        93       909        95
VIS    2025250    183200   23.4200  144.7500      10.6        93       910        92
VIS    2025250    183200   23.4300  144.7200      10.5        92       908        97
VIS    2025250    183200   23.4200  144.7000      10.4        92       911        96
VIS    2025250    183200   23.4200  143.8900      11.5        94       992        97
VIS    2025250    183200   23.4300  143.8600      11.2        92       975        99
VIS    2025250    183200   23.4300  143.8600      11.2        92       975        98
VIS    2025250    183200   23.4300  143.8100      11.8        96       933        97
VIS    2025250    183200   23.4100  143.7900      11.0        94       915        98
VIS    2025250    183200   23.4200  143.7800      10.8        97       915        97
VIS    2025250    183200   23.4200  143.7400       9.7        94       918        97
VIS    2025250    183200   23.4100  143.7300       9.7        94       918        97
VIS    2025250    183200   23.4100  143.7100       9.6        93       949        97
VIS    2025250    183200   23.4300  143.6700       9.3        91       977        96
VIS    2025250    183200   23.4100  143.1600       9.8        90       996        97
VIS    2025250    183200   23.4000  143.1200       9.8        90       993        99
VIS    2025250    183200   23.4000  143.1100       9.9        91       993       100
VIS    2025250    183200   23.4100  143.0700      10.3        92       995       100
VIS    2025250    183200   23.4000  143.0500      10.3        92       995       100
VIS    2025250    183200   23.4200  143.0100      10.6        97       995        98
VIS    2025250    183200   23.4100  142.9900      10.2        97       978        99
VIS    2025250    183200   23.4100  142.9800      10.0        96       978        99
VIS    2025250    183200   23.4200  142.9400       9.6        96       991        99
VIS    2025250    183200   23.4000  142.9300       9.6        95       972        99
VIS    2025250    183200   23.4000  142.9000       9.2        95       942        99
VIS    2025250    183200   23.4000  142.8700       8.9        97       961        98
VIS    2025250    183200   23.4000  142.8600       8.7        99       969        97
VIS    2025250    183200   23.4000  142.8300       8.5       102       969        95
VIS    2025250    183200   23.4000  142.7900       8.8        98       995        95
VIS    2025250    183200   23.4900  151.6900       7.8        76       939        90
VIS    2025250    183200   23.4900  151.6600       7.5        80       935        94
VIS    2025250    183200   23.4900  151.6400       8.1        83       908        93
VIS    2025250    183200   23.4800  151.5700       6.5        81       855        94
VIS    2025250    183200   23.4700  149.9000       7.7       102       994        97
VIS    2025250    183200   23.4600  149.8700       8.9       113       961        92
VIS    2025250    183200   23.4600  149.8600       8.9       113       961        92
VIS    2025250    183200   23.4600  149.8400       9.3       114       936        90
VIS    2025250    183200   23.4400  147.8700       8.3        92       973        98
VIS    2025250    183200   23.4500  147.8500       8.6        90       948        98
VIS    2025250    183200   23.4300  147.8200       9.0        96       913        98
VIS    2025250    183200   23.4500  147.8200       9.0        94       921        99
VIS    2025250    183200   23.4300  147.7500       9.7        97       896        94
VIS    2025250    183200   23.4200  147.3400       9.4       103       832        93
VIS    2025250    183200   23.4200  147.3100       9.2       103       850        90
VIS    2025250    183200   23.4400  147.3000       8.7       105       838        97
VIS    2025250    183200   23.4200  147.2600       9.2       100       864        93
VIS    2025250    183200   23.4200  147.2300       9.3        98       900        93
VIS    2025250    183200   23.4400  147.2300       9.7        97       900        97
VIS    2025250    183200   23.4300  147.1800       9.3        96       909        97
VIS    2025250    183200   23.4400  147.1700       9.5        94       941        95
VIS    2025250    183200   23.4200  147.1300       9.7        87       958        98
VIS    2025250    183200   23.4400  147.1200      10.2        87       957        96
VIS    2025250    183200   23.4200  147.0900       9.7        92       909        98
VIS    2025250    183200   23.4300  147.0600       9.8        95       899        97
VIS    2025250    183200   23.4200  147.0400       9.7        91       897        96
VIS    2025250    183200   23.4200  147.0200       9.8        89       896        98
VIS    2025250    183200   23.4300  147.0000       9.9        88       895        98
VIS    2025250    183200   23.4200  146.9700       9.6        84       894        96
VIS    2025250    183200   23.4300  146.9300       9.5        83       893        96
VIS    2025250    183200   23.4300  146.9200       9.5        84       893        96
VIS    2025250    183200   23.4300  146.8900       9.5        88       893        97
VIS    2025250    183200   23.4200  146.8600       9.4        89       894        95
VIS    2025250    183200   23.4300  146.8400       9.4        90       892        97
VIS    2025250    183200   23.4300  146.8200       9.7        91       892        97
VIS    2025250    183200   23.4200  146.7700       9.4        88       892        98
VIS    2025250    183200   23.4200  146.7600       9.4        87       892        98
VIS    2025250    183200   23.4200  146.7200       9.1        92       895        98
VIS    2025250    183200   23.4100  146.6900       9.0        94       896        98
VIS    2025250    183200   23.4200  146.6700       9.0        94       896        97
VIS    2025250    183200   23.4300  146.6600       9.1        95       895        95
VIS    2025250    183200   23.4100  146.6200       9.1        88       894        96
VIS    2025250    183200   23.4200  146.6100       9.2        91       896        98
VIS    2025250    183200   23.4200  146.4500       9.0        91       898        98
VIS    2025250    183200   23.4200  146.4300       9.2        87       898        98
VIS    2025250    183200   23.4100  146.4000       9.4        83       901        94
VIS    2025250    183200   23.4300  146.3600       9.1        85       910        96
VIS    2025250    183200   23.4100  146.3400       9.1        96       915        95
VIS    2025250    183200   23.4100  145.7500      10.7        95       923        90
VIS    2025250    183200   23.4000  145.7000      10.4        92       935        99
VIS    2025250    183200   23.4000  145.6900      10.0        90       940        99
VIS    2025250    183200   23.4000  145.6700       9.9        88       958        98
VIS    2025250    183200   23.4000  145.6300      10.3        86       936        99
VIS    2025250    183200   23.4200  145.6000      11.0        87       948        99
VIS    2025250    183200   23.4100  145.5800      10.5        88       942        98
VIS    2025250    183200   23.4100  145.5600      10.6        89       940        99
VIS    2025250    183200   23.4200  145.5500      10.6        89       940       100
VIS    2025250    183200   23.4000  145.5000      10.7        87       929       100
VIS    2025250    183200   23.4000  145.4800      11.2        89       920        99
VIS    2025250    183200   23.4100  145.4600      11.1        92       919        99
VIS    2025250    183200   23.4000  145.3200      11.9        87       959        95
VIS    2025250    183200   23.4000  145.2900      12.0        90       946        98
VIS    2025250    183200   23.4000  145.2800      11.7        90       946        98
VIS    2025250    183200   23.4100  145.2500      11.3        89       957        98
VIS    2025250    183200   23.4100  145.2300      11.4        90       968        98
VIS    2025250    183200   23.3900  145.1100      10.7        86       985        99
VIS    2025250    183200   23.3900  145.0900      10.9        87       976        99
VIS    2025250    183200   23.4000  145.0600      10.5        91       976        99
VIS    2025250    183200   23.4100  145.0400      10.3        90       967        99
VIS    2025250    183200   23.4100  144.9800      10.7        89       938        99
VIS    2025250    183200   23.3900  144.9600      10.6        88       972        98
VIS    2025250    183200   23.4000  144.9500      10.7        87       970        98
VIS    2025250    183200   23.4100  144.9100      10.8        84       952        96
VIS    2025250    183200   23.4100  144.8900      10.7        85       944        94
VIS    2025250    183200   23.4000  144.8800      10.8        86       946        95
VIS    2025250    183200   23.3900  144.8400      11.2        83       939        96
VIS    2025250    183200   23.4100  144.8200      11.2        86       911        96
VIS    2025250    183200   23.4100  144.7900      10.9        90       911        98
VIS    2025250    183200   23.4100  144.7600      10.6        92       911        94
VIS    2025250    183200   23.4100  144.7500      10.6        93       910        93
VIS    2025250    183200   23.3900  144.7200      10.5        90       911        96
VIS    2025250    183200   23.4100  144.7000      10.3        92       915        97
VIS    2025250    183200   23.3900  143.9000      11.9        95       994        97
VIS    2025250    183200   23.3900  143.8700      11.9        95       985        97
VIS    2025250    183200   23.3900  143.8500      12.0        95       981        98
VIS    2025250    183200   23.3800  143.8400      12.0        94       977        98
VIS    2025250    183200   23.4000  143.8100      11.8        95       933        98
VIS    2025250    183200   23.3800  143.7700      10.2        90       915        99
VIS    2025250    183200   23.3900  143.7700       9.9        92       913        99
VIS    2025250    183200   23.3800  143.7200      10.1        92       912        97
VIS    2025250    183200   23.4000  143.7200       9.6        93       929        97
VIS    2025250    183200   23.4000  143.6700       9.1        91       977        93
VIS    2025250    183200   23.4000  143.6700       9.1        91       978        93
VIS    2025250    183200   23.4000  143.1600       9.8        91       996        98
VIS    2025250    183200   23.4000  143.1200       9.8        90       988        99
VIS    2025250    183200   23.4000  143.1000       9.9        91       988       100
VIS    2025250    183200   23.3800  143.0700      10.2        95       960        99
VIS    2025250    183200   23.3800  143.0400      10.1        95       960        99
VIS    2025250    183200   23.3800  143.0200      10.0        95       970        99
VIS    2025250    183200   23.3900  142.9500      10.0        95       972        99
VIS    2025250    183200   23.4000  142.9300       9.6        95       957        99
VIS    2025250    183200   23.3900  142.9000       9.2        95       942        99
VIS    2025250    183200   23.3900  142.8700       9.0        96       933        98
VIS    2025250    183200   23.3900  142.8600       8.9        97       961        98
VIS    2025250    183200   23.3800  142.8400       8.6        97       928        96
VIS    2025250    183200   23.3700  142.8100       9.0        98       932        97
VIS    2025250    183200   23.3700  142.7900       9.0        96       958        99
VIS    2025250    183200   23.3700  142.7600       9.1        95       963        99
VIS    2025250    183200   23.4700  151.6700       7.1        83       932        93
VIS    2025250    183200   23.4800  151.6500       7.7        84       912        94
VIS    2025250    183200   23.4000  147.8900       9.4        93       990       100
VIS    2025250    183200   23.4200  147.8700       9.1        95       948        99
VIS    2025250    183200   23.4000  147.8400       9.6        99       918        96
VIS    2025250    183200   23.4100  147.8100       9.4        99       891        93
VIS    2025250    183200   23.4000  147.8000       9.6       100       891        90
VIS    2025250    183200   23.4200  147.7700       9.7        99       899        92
VIS    2025250    183200   23.4000  147.7400       9.5        95       841        93
VIS    2025250    183200   23.4200  147.6600       9.3        93       823        93
VIS    2025250    183200   23.4000  147.6500       9.5        96       917        99
VIS    2025250    183200   23.4200  147.4800       9.9       105       790        90
VIS    2025250    183200   23.4100  147.4200      10.1       108       797        91
VIS    2025250    183200   23.4100  147.3900       9.8       108       797        90
VIS    2025250    183200   23.4100  147.3500       9.5       101       801        92
VIS    2025250    183200   23.3900  147.3400       9.2       100       801        91
VIS    2025250    183200   23.3900  147.3100       9.5       102       804        91
VIS    2025250    183200   23.4100  147.2500       9.4        98       892        93
VIS    2025250    183200   23.4100  147.2400       9.3        97       900        93
VIS    2025250    183200   23.4100  147.2000       8.9        99       900        94
VIS    2025250    183200   23.4000  147.1900       8.8       100       900        94
VIS    2025250    183200   23.4100  147.1500       9.6        92       941        99
VIS    2025250    183200   23.3900  147.1400      10.0        92       934        99
VIS    2025250    183200   23.4000  147.1100       9.6        89       934        99
VIS    2025250    183200   23.4100  147.0700       9.7        91       900        97
VIS    2025250    183200   23.4000  147.0600       9.6        89       898        97
VIS    2025250    183200   23.4100  147.0200       9.8        88       896        98
VIS    2025250    183200   23.4000  147.0100       9.7        85       896        97
VIS    2025250    183200   23.4000  146.9800       9.9        84       896        96
VIS    2025250    183200   23.3900  146.9600       9.8        84       896        94
VIS    2025250    183200   23.3900  146.9200       9.4        87       893        97
VIS    2025250    183200   23.3900  146.9000       9.3        88       893        96
VIS    2025250    183200   23.4100  146.8700       9.3        90       894        95
VIS    2025250    183200   23.4100  146.8600       9.3        89       894        95
VIS    2025250    183200   23.4000  146.8300       9.7        89       894        97
VIS    2025250    183200   23.3900  146.8100       9.6        90       892        99
VIS    2025250    183200   23.4000  146.7800       9.4        90       892        99
VIS    2025250    183200   23.4000  146.7600       9.4        90       895        99
VIS    2025250    183200   23.3900  146.7300       9.0        91       896        99
VIS    2025250    183200   23.3900  146.7000       9.0        93       896        98
VIS    2025250    183200   23.3800  146.6800       9.0        92       896        97
VIS    2025250    183200   23.4000  146.6300       8.9        87       894        92
VIS    2025250    183200   23.3900  146.5400       7.8        93       896        90
VIS    2025250    183200   23.4000  146.5300       7.6        91       896        90
VIS    2025250    183200   23.3800  146.4700       7.7        89       900        91
VIS    2025250    183200   23.4000  146.4300       8.9        86       900        93
VIS    2025250    183200   23.3900  146.4100       9.6        86       901        96
VIS    2025250    183200   23.4000  146.3500       8.6        94       903        90
VIS    2025250    183200   23.3700  145.7700      11.4        91       937        98
VIS    2025250    183200   23.3700  145.7600      12.0        91       935        96
VIS    2025250    183200   23.3700  145.7300      11.7        92       907        96
VIS    2025250    183200   23.3900  145.7000      10.2        92       925        98
VIS    2025250    183200   23.3800  145.6800      10.3        89       918        96
VIS    2025250    183200   23.3800  145.6700      10.3        87       918        96
VIS    2025250    183200   23.3800  145.6400      10.5        84       923        98
VIS    2025250    183200   23.3900  145.6000      10.7        84       944        98
VIS    2025250    183200   23.3900  145.5900      11.0        83       944        98
VIS    2025250    183200   23.3900  145.5400      10.9        88       940        95
VIS    2025250    183200   23.3900  145.5200      10.7        86       932        99
VIS    2025250    183200   23.3800  145.4900      11.2        88       924        98
VIS    2025250    183200   23.3800  145.4700      11.4        93       917        94
VIS    2025250    183200   23.3900  145.4600      11.3        93       917        95
VIS    2025250    183200   23.3800  145.3100      12.1        90       939        98
VIS    2025250    183200   23.3700  145.2800      12.0        91       939        98
VIS    2025250    183200   23.3700  145.2500      11.6        91       919        96
VIS    2025250    183200   23.3700  145.2500      11.5        90       925        97
VIS    2025250    183200   23.3800  145.1100      10.6        84       985        99
VIS    2025250    183200   23.3900  145.0900      10.7        88       983        99
VIS    2025250    183200   23.3800  145.0700      10.6        89       983        99
VIS    2025250    183200   23.3700  145.0300      10.2        88       983       100
VIS    2025250    183200   23.3700  145.0200      10.1        87       989       100
VIS    2025250    183200   23.3800  144.8300      11.2        83       939        95
VIS    2025250    183200   23.3700  144.8000      11.0        87       926        96
VIS    2025250    183200   23.3700  144.7800      10.8        87       926        97
VIS    2025250    183200   23.3800  144.7600      10.6        86       912        96
VIS    2025250    183200   23.3700  144.7300      10.8        85       920        98
VIS    2025250    183200   23.3800  144.7200      10.7        89       923        98
VIS    2025250    183200   23.3700  143.8900      11.9        94       994        98
VIS    2025250    183200   23.3800  143.8500      12.1        94       981        98
VIS    2025250    183200   23.3800  143.8200      11.8        94       976        98
VIS    2025250    183200   23.3700  143.7900      10.8        91       922        99
VIS    2025250    183200   23.3800  143.7800      10.3        90       915        99
VIS    2025250    183200   23.3700  143.7600      10.0        90       913       100
VIS    2025250    183200   23.3700  143.7300      10.1        91       911        99
VIS    2025250    183200   23.3700  143.7100       9.9        91       920        98
VIS    2025250    183200   23.3600  143.6700       9.5        87       957        95
VIS    2025250    183200   23.3600  143.6500       9.5        82       980        97
VIS    2025250    183200   23.3600  143.1500       9.9        93       989        98
VIS    2025250    183200   23.3600  143.1200       9.8        91       979       100
VIS    2025250    183200   23.3500  143.0900       9.8        92       942       100
VIS    2025250    183200   23.3600  143.0800      10.0        95       942        99
VIS    2025250    183200   23.3600  143.0600      10.1        95       932        99
VIS    2025250    183200   23.3500  143.0300       9.8        94       927        97
VIS    2025250    183200   23.3700  142.9600      10.0        96       972        95
VIS    2025250    183200   23.3500  142.9300      10.4        90       957        91
VIS    2025250    183200   23.3600  142.9000       9.9        91       940        93
VIS    2025250    183200   23.3700  142.8800       9.3        93       928        92
VIS    2025250    183200   23.3700  142.8600       9.1        94       927        93
VIS    2025250    183200   23.3500  142.8200       9.7        97       925        92
VIS    2025250    183200   23.3600  142.8100       9.3        97       925        93
VIS    2025250    183200   23.3500  142.7700       9.3        94       958        97
VIS    2025250    183200   23.3500  142.7600       9.5        96       963        98
VIS    2025250    183200   23.3500  142.7200       9.4       101       971        96
VIS    2025250    183200   23.3500  142.7100       9.3       101       955        97
VIS    2025250    183200   23.3500  142.6700       9.8       101       952        94
VIS    2025250    183200   23.3500  142.6200      10.2        98       999        99
VIS    2025250    183200   23.3500  142.6100      10.2        98       999        99
VIS    2025250    183200   23.3500  142.5900      10.2        98       978        98
VIS    2025250    183200   23.4600  151.6700       6.6        84       935        93
VIS    2025250    183200   23.4400  151.6400       7.7        84       912        92
VIS    2025250    183200   23.4300  151.5900       7.4        84       859        90
VIS    2025250    183200   23.4500  151.5500       6.5        74       861        90
VIS    2025250    183200   23.4000  149.5000       9.4       104       866        98
VIS    2025250    183200   23.4000  149.4700       8.5       105       866        97
VIS    2025250    183200   23.4100  149.1700       7.6       107       916        91
VIS    2025250    183200   23.4100  149.1700       7.1       108       916        90
VIS    2025250    183200   23.4000  147.8800       9.5        94       988       100
VIS    2025250    183200   23.3800  147.8600       9.8        98       918        96
VIS    2025250    183200   23.3900  147.8400       9.7       100       918        95
VIS    2025250    183200   23.3800  147.7700       9.2        98       892        94
VIS    2025250    183200   23.3900  147.7300       9.4        95       841        94
VIS    2025250    183200   23.3900  147.7100       9.4        96       841        92
VIS    2025250    183200   23.3700  147.6800       9.5        96       917        99
VIS    2025250    183200   23.3900  147.6500       9.6        96       917        99
VIS    2025250    183200   23.3900  147.6500       9.6        96       917        99
VIS    2025250    183200   23.3800  147.4000      10.3       108       786        90
VIS    2025250    183200   23.3900  147.3500       9.2       100       798        90
VIS    2025250    183200   23.3700  147.3400       9.1       102       798        92
VIS    2025250    183200   23.3800  147.3100       9.4       103       804        93
VIS    2025250    183200   23.3800  147.2400       9.1        91       891        93
VIS    2025250    183200   23.3800  147.2000       8.4        96       894        90
VIS    2025250    183200   23.3800  147.1800       8.9        98       895        93
VIS    2025250    183200   23.3900  147.1400      10.1        92       917        99
VIS    2025250    183200   23.3800  147.1400      10.1        91       917        99
VIS    2025250    183200   23.3700  147.0900       9.5        86       905        96
VIS    2025250    183200   23.3800  147.0800       9.4        86       901        96
VIS    2025250    183200   23.3700  147.0400       9.6        81       897        94
VIS    2025250    183200   23.3800  147.0100       9.6        83       897        96
VIS    2025250    183200   23.3800  147.0100       9.6        84       897        96
VIS    2025250    183200   23.3700  146.9700       9.9        86       897        94
VIS    2025250    183200   23.3800  146.9600       9.8        85       896        94
VIS    2025250    183200   23.3800  146.9200       9.4        86       893        96
VIS    2025250    183200   23.3600  146.8800       9.1        88       894        97
VIS    2025250    183200   23.3800  146.8800       9.2        89       894        97
VIS    2025250    183200   23.3800  146.8500       9.5        88       894        97
VIS    2025250    183200   23.3600  146.8100       9.6        87       896        96
VIS    2025250    183200   23.3600  146.8000       9.5        87       898        96
VIS    2025250    183200   23.3600  146.7800       9.2        87       900        97
VIS    2025250    183200   23.3600  146.7500       9.0        87       900        97
VIS    2025250    183200   23.3700  146.7100       8.9        92       896        98
VIS    2025250    183200   23.3700  146.7000       8.9        92       896        98
VIS    2025250    183200   23.3800  146.6800       8.9        91       896        97
VIS    2025250    183200   23.3700  146.5100       6.6        90       897        92
VIS    2025250    183200   23.3600  145.8400      10.1        98       906        90
VIS    2025250    183200   23.3600  145.7900      11.1        91       938        97
VIS    2025250    183200   23.3700  145.7900      10.5        91       937        98
VIS    2025250    183200   23.3700  145.7500      12.0        91       927        94
VIS    2025250    183200   23.3700  145.7400      11.8        92       910        94
VIS    2025250    183200   23.3700  145.7000      10.7        93       912        93
VIS    2025250    183200   23.3700  145.6800      10.3        91       918        93
VIS    2025250    183200   23.3600  145.6600      10.1        87       913        96
VIS    2025250    183200   23.3600  145.6100      11.2        81       923        98
VIS    2025250    183200   23.3600  145.6100      11.3        80       923        98
VIS    2025250    183200   23.3500  145.5700      11.5        83       944        99
VIS    2025250    183200   23.3500  145.5500      11.3        84       963        97
VIS    2025250    183200   23.3700  145.5100      10.8        87       929        92
VIS    2025250    183200   23.3700  145.4900      11.3        88       924        94
VIS    2025250    183200   23.3700  145.4800      11.5        91       917        94
VIS    2025250    183200   23.3400  145.3300      11.4        87       975        96
VIS    2025250    183200   23.3400  145.3000      11.9        89       953        97
VIS    2025250    183200   23.3600  145.2900      12.1        90       939        97
VIS    2025250    183200   23.3500  145.2500      11.6        92       915        94
VIS    2025250    183200   23.3500  145.2300      11.3        94       919        91
VIS    2025250    183200   23.3500  145.1600      10.7        90       974        98
VIS    2025250    183200   23.3600  145.1200      10.5        83       989        95
VIS    2025250    183200   23.3400  145.1000      10.5        86       980        99
VIS    2025250    183200   23.3600  145.0800      10.6        87       976        99
VIS    2025250    183200   23.3400  145.0500      10.4        89       967        99
VIS    2025250    183200   23.3400  145.0200      10.2        87       961        99
VIS    2025250    183200   23.3400  145.0100      10.1        86       961        99
VIS    2025250    183200   23.3600  144.8300      11.1        83       981        96
VIS    2025250    183200   23.3600  144.7900      10.8        86       937        96
VIS    2025250    183200   23.3600  144.7400      10.8        81       926        95
VIS    2025250    183200   23.3500  144.7300      11.1        82       935        96
VIS    2025250    183200   23.3600  144.7100      11.1        88       927        97
VIS    2025250    183200   23.3400  143.8800      11.0        90       977        95
VIS    2025250    183200   23.3300  143.8700      10.9        92       977        95
VIS    2025250    183200   23.3500  143.8400      11.4        94       977        98
VIS    2025250    183200   23.3300  143.8000      10.8        92       936        98
VIS    2025250    183200   23.3400  143.7800      10.3        91       922        98
VIS    2025250    183200   23.3300  143.7600       9.9        91       922        99
VIS    2025250    183200   23.3300  143.7500       9.7        91       918        99
VIS    2025250    183200   23.3500  143.7200      10.0        88       914        99
VIS    2025250    183200   23.3400  143.6800       9.6        85       948        95
VIS    2025250    183200   23.3500  143.6700       9.5        86       949        94
VIS    2025250    183200   23.3300  143.1200      10.0        91       960        98
VIS    2025250    183200   23.3300  143.1000       9.9        91       942        99
VIS    2025250    183200   23.3300  143.0800       9.8        93       926        99
VIS    2025250    183200   23.3200  143.0600      10.0        92       921        98
VIS    2025250    183200   23.3400  143.0300       9.9        94       926        97
VIS    2025250    183200   23.3400  142.8200       9.8        97       925        92
VIS    2025250    183200   23.3400  142.7600       9.5        95       958        93
VIS    2025250    183200   23.3400  142.7600       9.6        96       963        94
VIS    2025250    183200   23.3400  142.7300       9.5        99       958        97
VIS    2025250    183200   23.3200  142.6600       9.5        98       951        94
VIS    2025250    183200   23.3200  142.6600       9.6        98       952        94
VIS    2025250    183200   23.3300  142.6100      10.0        98       983        97
VIS    2025250    183200   23.3300  142.6000       9.6        98       978        95
VIS    2025250    183200   23.3300  142.5800       9.5       100       978        93
VIS    2025250    183200   23.3200  142.5400       9.8       102       995        96
VIS    2025250    183200   23.3200  142.5300       9.8       101       982        94
VIS    2025250    183200   23.3200  142.4900       9.4        97       977        95
VIS    2025250    183200   23.3200  142.4800       9.4        97       978        95
VIS    2025250    183200   23.4100  151.6500       7.4        80       942        93
VIS    2025250    183200   23.4300  151.6200       8.1        84       912        91
VIS    2025250    183200   23.4100  151.5800       7.0        87       862        94
VIS    2025250    183200   23.4100  151.5600       7.0        83       862        90
VIS    2025250    183200   23.3800  149.7500      11.1       120       906        92
VIS    2025250    183200   23.3800  149.7500      11.2       120       917        91
VIS    2025250    183200   23.3900  149.7200      12.0       123       889        90
VIS    2025250    183200   23.3800  149.5100      10.1       103       868        95
VIS    2025250    183200   23.3700  149.4800       9.7        99       868        95
VIS    2025250    183200   23.3800  149.4600       8.5       103       866        94
VIS    2025250    183200   23.3700  149.4200       7.4       106       853        94
VIS    2025250    183200   23.3800  149.3600       8.6       114       859        96
VIS    2025250    183200   23.3700  149.3000       8.2       115       859        97
VIS    2025250    183200   23.3900  149.2800       7.5       118       862        95
VIS    2025250    183200   23.3700  147.9200       9.5        88       997        90
VIS    2025250    183200   23.3600  147.9100       9.7        92       988        91
VIS    2025250    183200   23.3600  147.8800       9.7        95       969        96
VIS    2025250    183200   23.3700  147.8500      10.0       100       916        93
VIS    2025250    183200   23.3600  147.7700       8.8       101       888        91
VIS    2025250    183200   23.3700  147.7600       8.7        98       890        96
VIS    2025250    183200   23.3700  147.7200       9.0        96       846        96
VIS    2025250    183200   23.3500  147.7000       9.1        96       846        96
VIS    2025250    183200   23.3700  147.6700       9.7        96       917        99
VIS    2025250    183200   23.3700  147.6500       9.9        98       912        98
VIS    2025250    183200   23.3400  147.4000      10.0       103       786        90
VIS    2025250    183200   23.3600  147.3300       9.1       102       794        93
VIS    2025250    183200   23.3600  147.3100       9.2       101       794        92
VIS    2025250    183200   23.3500  147.2900       9.2        96       791        90
VIS    2025250    183200   23.3500  147.2100       8.8        93       891        93
VIS    2025250    183200   23.3600  147.2000       8.3        93       894        90
VIS    2025250    183200   23.3400  147.1600       9.6        95       895        98
VIS    2025250    183200   23.3600  147.1300      10.2        93       901        99
VIS    2025250    183200   23.3500  147.1200       9.9        92       905        98
VIS    2025250    183200   23.3400  147.0900       9.3        87       903        96
VIS    2025250    183200   23.3500  147.0500       9.4        83       896        93
VIS    2025250    183200   23.3500  147.0500       9.4        83       896        93
VIS    2025250    183200   23.3600  147.0200       9.7        84       897        95
VIS    2025250    183200   23.3400  146.9700       9.6        87       895        96
VIS    2025250    183200   23.3400  146.9500       9.6        85       894        97
VIS    2025250    183200   23.3400  146.9400       9.6        86       894        97
VIS    2025250    183200   23.3500  146.9000       9.3        87       894        98
VIS    2025250    183200   23.3500  146.8800       8.9        88       894        97
VIS    2025250    183200   23.3400  146.8500       8.4        86       897        95
VIS    2025250    183200   23.3500  146.8300       8.9        86       897        95
VIS    2025250    183200   23.3600  146.8100       9.5        87       898        96
VIS    2025250    183200   23.3600  146.7900       9.2        86       900        96
VIS    2025250    183200   23.3400  146.7500       8.7        86       901        97
VIS    2025250    183200   23.3400  146.7300       8.9        88       900        98
VIS    2025250    183200   23.3300  146.7100       8.9        88       900        97
VIS    2025250    183200   23.3400  146.6800       8.5        93       897        96
VIS    2025250    183200   23.3200  145.7800      11.2        91       928        96
VIS    2025250    183200   23.3200  145.7500      11.8        86       939        91
VIS    2025250    183200   23.3300  145.7500      11.9        86       947        91
VIS    2025250    183200   23.3200  145.7000       9.5        90       955        99
VIS    2025250    183200   23.3200  145.7000       9.4        91       955        99
VIS    2025250    183200   23.3300  145.6600       9.5        88       907        97
VIS    2025250    183200   23.3300  145.6400       9.8        86       905        99
VIS    2025250    183200   23.3200  145.6000      10.5        86       909        99
VIS    2025250    183200   23.3300  145.5700      10.7        84       923        99
VIS    2025250    183200   23.3400  145.5700      11.4        83       943        99
VIS    2025250    183200   23.3400  145.5300      10.8        85       963        96
VIS    2025250    183200   23.3400  145.5100      10.6        85       963        92
VIS    2025250    183200   23.3400  145.3000      11.8        88       953        97
VIS    2025250    183200   23.3300  145.2900      11.8        88       953        98
VIS    2025250    183200   23.3300  145.2700      11.8        89       921        98
VIS    2025250    183200   23.3200  145.2300      11.5        96       929        97
VIS    2025250    183200   23.3200  145.1700      10.7        93       987        98
VIS    2025250    183200   23.3300  145.1500      10.9        92       968        99
VIS    2025250    183200   23.3200  145.1300      10.8        91       965        98
VIS    2025250    183200   23.3300  145.1100      10.6        89       968        99
VIS    2025250    183200   23.3300  145.0600      10.3        88       967        97
VIS    2025250    183200   23.3300  145.0400      10.3        87       964        97
VIS    2025250    183200   23.3400  145.0100      10.1        86       961        99
VIS    2025250    183200   23.3300  143.8900      11.0        90       977        93
VIS    2025250    183200   23.3200  143.8700      10.8        92       977        94
VIS    2025250    183200   23.3200  143.8400      10.8        94       975        99
VIS    2025250    183200   23.3200  143.8100      10.8        92       947        99
VIS    2025250    183200   23.3000  143.8000      10.6        90       929        99
VIS    2025250    183200   23.3100  143.7700      10.2        91       927        98
VIS    2025250    183200   23.3200  143.7600       9.9        91       926        99
VIS    2025250    183200   23.3100  143.7300       9.5        87       926        97
VIS    2025250    183200   23.3200  143.7100       9.4        85       920        98
VIS    2025250    183200   23.3200  143.1200      10.0        90       961        97
VIS    2025250    183200   23.3100  143.0900       9.8        92       932        98
VIS    2025250    183200   23.3000  143.0800       9.8        93       939        94
VIS    2025250    183200   23.3000  143.0500      10.3        88       937        95
VIS    2025250    183200   23.3200  142.7500       9.9        96       958        91
VIS    2025250    183200   23.3000  142.6800       9.6        96       937        97
VIS    2025250    183200   23.3100  142.6500       9.5        97       952        94
VIS    2025250    183200   23.3000  142.6100       9.8        96       978        92
VIS    2025250    183200   23.3100  142.6000       9.5        96       978        96
VIS    2025250    183200   23.2900  142.5800       9.9        99       975        98
VIS    2025250    183200   23.3000  142.5400       9.8       102       959        97
VIS    2025250    183200   23.3000  142.5300       9.6       100       976        96
VIS    2025250    183200   23.3100  142.5000       9.4        98       977        95
VIS    2025250    183200   23.3000  142.4800       9.4        96       970        98
VIS    2025250    183200   23.3800  151.7000       8.1        80       991        90
VIS    2025250    183200   23.3900  151.6500       7.6        81       967        91
VIS    2025250    183200   23.3900  151.6300       7.8        82       942        93
VIS    2025250    183200   23.3900  151.6000       7.3        86       889        98
VIS    2025250    183200   23.3700  149.7400      10.8       120       918        90
VIS    2025250    183200   23.3500  149.7300      10.0       119       918        92
VIS    2025250    183200   23.3600  149.6800      11.1       121       889        91
VIS    2025250    183200   23.3500  149.5100      10.3       109       869        93
VIS    2025250    183200   23.3700  149.4800       9.8        99       868        95
VIS    2025250    183200   23.3700  149.4700       9.4        99       867        95
VIS    2025250    183200   23.3400  149.4300       7.4       106       854        95
VIS    2025250    183200   23.3700  149.4100       7.4       106       854        96
VIS    2025250    183200   23.3500  149.3900       7.3       102       859        91
VIS    2025250    183200   23.3500  149.3500       8.2       114       862        97
VIS    2025250    183200   23.3500  149.3200       9.7       122       861        94
VIS    2025250    183200   23.3600  149.3100       9.1       121       861        95
VIS    2025250    183200   23.3600  149.2900       8.3       113       861        94
VIS    2025250    183200   23.3400  147.8900       9.8        95       986        94
VIS    2025250    183200   23.3300  147.8600       9.4        97       947        95
VIS    2025250    183200   23.3400  147.8300       9.7       101       902        90
VIS    2025250    183200   23.3300  147.7600       8.3       101       879        95
VIS    2025250    183200   23.3200  147.7400       8.4        97       846        95
VIS    2025250    183200   23.3200  147.7100       9.0        96       832        95
VIS    2025250    183200   23.3400  147.6800       9.5        96       836        95
VIS    2025250    183200   23.3300  147.6700       9.6        98       832        93
VIS    2025250    183200   23.3400  147.4000       9.9       102       787        90
VIS    2025250    183200   23.3100  147.2300       9.3        89       889        97
VIS    2025250    183200   23.3200  147.2100       8.9        91       892        94
VIS    2025250    183200   23.3200  147.1700       9.5        92       895        97
VIS    2025250    183200   23.3300  147.1600       9.6        93       895        98
VIS    2025250    183200   23.3100  147.1300       9.6        91       896        93
VIS    2025250    183200   23.3300  147.1100       9.5        90       900        97
VIS    2025250    183200   23.3200  147.0800       9.2        88       899        97
VIS    2025250    183200   23.3200  147.0600       8.9        87       897        97
VIS    2025250    183200   23.3300  147.0200       9.5        86       896        95
VIS    2025250    183200   23.3300  147.0100       9.4        87       896        96
VIS    2025250    183200   23.3300  146.9800       9.5        86       895        97
VIS    2025250    183200   23.3300  146.9400       9.6        85       894        97
VIS    2025250    183200   23.3100  146.9100       9.6        87       895        98
VIS    2025250    183200   23.3100  146.8900       9.1        86       896        97
VIS    2025250    183200   23.3300  146.8600       8.1        86       897        95
VIS    2025250    183200   23.3200  146.8500       7.8        84       898        93
VIS    2025250    183200   23.3100  146.8300       8.3        80       900        91
VIS    2025250    183200   23.3300  146.8000       9.0        84       900        92
VIS    2025250    183200   23.3100  146.7600       8.8        87       901        96
VIS    2025250    183200   23.3100  146.7300       8.7        88       902        95
VIS    2025250    183200   23.3300  146.7100       8.8        87       901        96
VIS    2025250    183200   23.3300  146.7000       8.6        87       901        96
VIS    2025250    183200   23.3100  146.6700       7.0        96       891        91
VIS    2025250    183200   23.3200  146.6300       8.1        97       886        97
VIS    2025250    183200   23.3100  146.5800       9.8        97       896        94
VIS    2025250    183200   23.3100  146.5700       9.9        98       896        94
VIS    2025250    183200   23.3000  145.7200      10.0        89       955        99
VIS    2025250    183200   23.3100  145.7000       9.2        90       949        99
VIS    2025250    183200   23.3000  145.6800       9.0        88       910        96
VIS    2025250    183200   23.3000  145.6500       9.4        85       903        95
VIS    2025250    183200   23.3000  145.6100       9.9        87       908        99
VIS    2025250    183200   23.2900  145.6000       9.6        86       908        99
VIS    2025250    183200   23.2900  145.5800       9.1        84       915        96
VIS    2025250    183200   23.3100  145.3200      11.4        84       975        91
VIS    2025250    183200   23.3100  145.2900      11.7        86       975        97
VIS    2025250    183200   23.2900  145.2700      11.6        88       969        97
VIS    2025250    183200   23.3100  145.2600      11.9        89       929        98
VIS    2025250    183200   23.3100  145.2300      11.5        95       929        97
VIS    2025250    183200   23.2900  145.2100      11.0        92       948        98
VIS    2025250    183200   23.3100  145.1700      10.7        90       974        99
VIS    2025250    183200   23.3100  145.1400      10.8        91       968        98
VIS    2025250    183200   23.2800  143.8700      10.7        91       982        96
VIS    2025250    183200   23.2900  143.8500      11.1        94       982        98
VIS    2025250    183200   23.2800  143.8200      10.9        91       957        99
VIS    2025250    183200   23.2900  143.8000      10.6        90       936       100
VIS    2025250    183200   23.2900  143.7700      10.2        91       929        99
VIS    2025250    183200   23.3000  143.7500      10.0        89       936        97
VIS    2025250    183200   23.2900  143.7200       9.8        88       936        98
VIS    2025250    183200   23.3000  143.7000       9.5        86       922        98
VIS    2025250    183200   23.2900  143.1000       9.9        92       963        90
VIS    2025250    183200   23.2900  143.0700      10.0        92       958        93
VIS    2025250    183200   23.2900  143.0400      10.6        85       956        94
VIS    2025250    183200   23.2800  142.7100       9.9        94       956        96
VIS    2025250    183200   23.2900  142.6900       9.8        95       937        97
VIS    2025250    183200   23.2900  142.6700       9.6        95       937        98
VIS    2025250    183200   23.2700  142.6300      10.3        99       985        98
VIS    2025250    183200   23.2900  142.6000       9.9        97       978        95
VIS    2025250    183200   23.2900  142.6000       9.8        97       975        96
VIS    2025250    183200   23.2700  142.5600      10.0        99       953        97
VIS    2025250    183200   23.2700  142.5400      10.0       100       950        95
VIS    2025250    183200   23.2700  142.5000       9.7        98       958        98
VIS    2025250    183200   23.2700  142.5000       9.6        98       958        98
VIS    2025250    183200   23.3800  151.7000       8.1        80       991        91
VIS    2025250    183200   23.3800  151.6700       7.6        80       970        91
VIS    2025250    183200   23.3600  151.6400       7.8        82       963        90
VIS    2025250    183200   23.3600  151.6400       7.9        81       960        90
VIS    2025250    183200   23.3700  151.5900       7.0        86       881        96
VIS    2025250    183200   23.3400  149.8100       8.6       107       976        93
VIS    2025250    183200   23.3200  149.8000       7.9       103       976        96
VIS    2025250    183200   23.3200  149.7600       9.1       114       941        91
VIS    2025250    183200   23.3300  149.7400       9.7       119       917        92
VIS    2025250    183200   23.3200  149.7100       9.9       119       892        92
VIS    2025250    183200   23.3400  149.6700      10.6       120       899        91
VIS    2025250    183200   23.3300  149.6400      11.6       121       903        90
VIS    2025250    183200   23.3200  149.5100       9.0       112       873        96
VIS    2025250    183200   23.3200  149.5000       8.9       109       870        99
VIS    2025250    183200   23.3300  149.4600       9.0       104       866        97
VIS    2025250    183200   23.3200  149.4400       7.8       103       862        97
VIS    2025250    183200   23.3400  149.3400       7.4       113       866        96
VIS    2025250    183200   23.3400  149.3000       8.5       115       862        96
VIS    2025250    183200   23.3200  149.2700       7.2       107       867        93
VIS    2025250    183200   23.3000  147.9000       9.1       108       982        94
VIS    2025250    183200   23.3000  147.8700       9.1       104       979        93
VIS    2025250    183200   23.3000  147.8500       9.1       102       958        95
VIS    2025250    183200   23.3100  147.8400       9.1        99       940        94
VIS    2025250    183200   23.3100  147.7800       8.7       101       899        94
VIS    2025250    183200   23.3100  147.7600       8.2       103       889        92
VIS    2025250    183200   23.3200  147.7400       8.4        98       846        95
VIS    2025250    183200   23.2900  147.6900       9.8       100       822        91
VIS    2025250    183200   23.3100  147.2300       9.3        88       891        96
VIS    2025250    183200   23.2900  147.2000       9.2        85       892        96
VIS    2025250    183200   23.2900  147.1700       9.4        87       895        97
VIS    2025250    183200   23.3000  147.1300       9.5        90       895        92
VIS    2025250    183200   23.3000  147.1200       9.6        91       895        93
VIS    2025250    183200   23.3100  147.0900       9.4        89       899        97
VIS    2025250    183200   23.3000  147.0800       9.2        89       899        97
VIS    2025250    183200   23.2900  147.0400       9.1        90       898        98
VIS    2025250    183200   23.3000  147.0200       9.1        89       896        98
VIS    2025250    183200   23.3000  146.9800       9.0        85       896        96
VIS    2025250    183200   23.3000  146.9500       9.3        84       896        96
VIS    2025250    183200   23.2800  146.9300       9.8        85       897        96
VIS    2025250    183200   23.2900  146.9100       9.3        86       899        96
VIS    2025250    183200   23.3000  146.8900       9.0        84       899        96
VIS    2025250    183200   23.2800  146.8700       8.6        79       899        92
VIS    2025250    183200   23.3000  146.8300       8.2        79       900        92
VIS    2025250    183200   23.2900  146.8200       8.7        85       900        96
VIS    2025250    183200   23.2900  146.7800       9.2        88       901        98
VIS    2025250    183200   23.3000  146.7600       8.8        88       901        98
VIS    2025250    183200   23.3000  146.7300       8.4        88       902        95
VIS    2025250    183200   23.3000  146.5800       9.7        97       894        93
VIS    2025250    183200   23.3000  146.5700       9.9        98       896        93
VIS    2025250    183200   23.2800  145.7300      10.2        95       949        98
VIS    2025250    183200   23.2700  145.7300      10.2        96       928        98
VIS    2025250    183200   23.2700  145.7000       9.9        91       906        97
VIS    2025250    183200   23.2900  145.6800       9.1        86       903        95
VIS    2025250    183200   23.2900  145.6500       9.3        84       902        92
VIS    2025250    183200   23.2800  145.6100       9.5        86       905        99
VIS    2025250    183200   23.2700  145.6000       9.1        85       908        97
VIS    2025250    183200   23.2700  145.5800       8.7        82       916        92
VIS    2025250    183200   23.2700  145.3400      10.7        81       998        98
VIS    2025250    183200   23.2700  145.3300      10.9        82       998        98
VIS    2025250    183200   23.2800  145.2800      11.5        88       986        95
VIS    2025250    183200   23.2700  145.2600      11.6        88       964        99
VIS    2025250    183200   23.2700  145.2500      11.5        88       964        99
VIS    2025250    183200   23.2900  145.2200      11.3        92       931        98
VIS    2025250    183200   23.2700  145.1900      11.1        91       926        99
VIS    2025250    183200   23.2600  145.1600      10.8        92       939        99
VIS    2025250    183200   23.2600  145.1300      10.4        92       963        97
VIS    2025250    183200   23.2600  145.1200      10.3        91       963        96
VIS    2025250    183200   23.2700  143.9800      10.9        92       991        93
VIS    2025250    183200   23.2500  143.9700      10.9        91       982        97
VIS    2025250    183200   23.2700  143.8700      10.5        91       987        98
VIS    2025250    183200   23.2700  143.8300      10.9        91       982        99
VIS    2025250    183200   23.2500  143.8200      10.9        92       976        99
VIS    2025250    183200   23.2700  143.7900      10.6        91       934        98
VIS    2025250    183200   23.2600  143.7700      10.2        94       934        96
VIS    2025250    183200   23.2700  143.7500       9.9        91       936        96
VIS    2025250    183200   23.2600  143.7200      10.2        94       951        99
VIS    2025250    183200   23.2700  143.7000      10.0        92       931       100
VIS    2025250    183200   23.2600  143.0400      10.7        90       984        90
VIS    2025250    183200   23.2600  143.0100      10.4        86       984        98
VIS    2025250    183200   23.2500  142.7300      10.1        94       987        97
VIS    2025250    183200   23.2500  142.7200      10.2        95       987        97
VIS    2025250    183200   23.2400  142.6800       9.9        96       981        99
VIS    2025250    183200   23.2500  142.6400      10.1        96       969        99
VIS    2025250    183200   23.2500  142.6300      10.4        98       956        99
VIS    2025250    183200   23.2500  142.5900      10.2        99       931        98
VIS    2025250    183200   23.2600  142.5700      10.1        99       927        98
VIS    2025250    183200   23.2600  142.5400      10.2       100       932        95
VIS    2025250    183200   23.2600  142.5300      10.1       100       932        96
VIS    2025250    183200   23.2600  142.4900       9.5        98       950        98
VIS    2025250    183200   23.3500  151.7000       8.0        91       963        92
VIS    2025250    183200   23.3400  151.6600       7.5        84       960        93
VIS    2025250    183200   23.3300  151.6200       8.1        85       898        95
VIS    2025250    183200   23.3300  151.6100       8.0        86       892        95
VIS    2025250    183200   23.3200  150.9100       5.7       104       994        91
VIS    2025250    183200   23.3200  149.8100       7.6       101       976        98
VIS    2025250    183200   23.3000  149.7800       8.1       106       970        95
VIS    2025250    183200   23.3000  149.7500       9.0       114       941        90
VIS    2025250    183200   23.3200  149.7100       9.9       119       887        92
VIS    2025250    183200   23.3200  149.5200       9.3       113       877        90
VIS    2025250    183200   23.3100  149.5000       8.5       110       873        99
VIS    2025250    183200   23.3100  149.4900       8.5       108       870        99
VIS    2025250    183200   23.3100  149.4400       8.0       106       864        98
VIS    2025250    183200   23.3000  149.4400       7.7       107       864        97
VIS    2025250    183200   23.3000  149.2800       7.0       106       870        91
VIS    2025250    183200   23.2900  149.2400       7.0       103       815        99
VIS    2025250    183200   23.2900  149.2100       6.8       107       806        95
VIS    2025250    183200   23.2900  148.1600      10.5        81       998        93
VIS    2025250    183200   23.2700  148.1300       9.9        84       995        96
VIS    2025250    183200   23.2900  148.1200      10.3        83       998        96
VIS    2025250    183200   23.2900  147.9100       8.5       108       982        92
VIS    2025250    183200   23.2800  147.8500       9.4       109       960        91
VIS    2025250    183200   23.2700  147.8100       9.2       103       962        92
VIS    2025250    183200   23.2700  147.7800       8.2       107       964        90
VIS    2025250    183200   23.2700  147.7300       8.2       102       944        97
VIS    2025250    183200   23.2700  147.7200       8.4       101       912        98
VIS    2025250    183200   23.2600  147.2400       8.9        89       892        93
VIS    2025250    183200   23.2700  147.2200       9.3        84       892        92
VIS    2025250    183200   23.2700  147.2100       9.5        83       894        93
VIS    2025250    183200   23.2700  147.1800       9.7        83       896        95
VIS    2025250    183200   23.2600  147.1400       9.1        87       896        96
VIS    2025250    183200   23.2800  147.1200       9.5        91       895        94
VIS    2025250    183200   23.2600  147.0900       9.8        90       897        98
VIS    2025250    183200   23.2700  147.0700       9.5        89       898        98
VIS    2025250    183200   23.2600  147.0600       9.3        88       898        98
VIS    2025250    183200   23.2600  147.0300       9.2        90       902        98
VIS    2025250    183200   23.2700  147.0000       9.1        88       897        97
VIS    2025250    183200   23.2600  146.9800       9.2        86       898        97
VIS    2025250    183200   23.2700  146.9400       9.7        84       898        96
VIS    2025250    183200   23.2600  146.9300       9.6        85       900        96
VIS    2025250    183200   23.2700  146.9000       9.0        81       900        95
VIS    2025250    183200   23.2600  146.8700       8.5        78       900        94
VIS    2025250    183200   23.2600  146.8400       8.8        83       900        95
VIS    2025250    183200   23.2600  146.8200       8.9        89       901        98
VIS    2025250    183200   23.2600  146.7900       9.1        88       901        98
VIS    2025250    183200   23.2600  146.7700       9.1        86       902        97
VIS    2025250    183200   23.2700  146.7500       8.7        88       901        95
VIS    2025250    183200   23.2500  145.8200      10.9        89       931        96
VIS    2025250    183200   23.2500  145.8000      10.3        90       978        99
VIS    2025250    183200   23.2500  145.7800       9.4        96       968        95
VIS    2025250    183200   23.2500  145.7400      10.2        96       923        98
VIS    2025250    183200   23.2400  145.7200      10.3        94       909        99
VIS    2025250    183200   23.2600  145.7100      10.2        92       909        99
VIS    2025250    183200   23.2600  145.6700       9.5        85       903        97
VIS    2025250    183200   23.2500  145.6600       9.7        86       905        99
VIS    2025250    183200   23.2400  145.6200       9.6        87       908        98
VIS    2025250    183200   23.2500  145.5900       9.3        86       908        98
VIS    2025250    183200   23.2500  145.5800       9.2        85       913        98
VIS    2025250    183200   23.2400  145.3300      11.1        85       998        99
VIS    2025250    183200   23.2500  145.3100      11.2        87       994        99
VIS    2025250    183200   23.2500  145.2900      11.6        88       983       100
VIS    2025250    183200   23.2600  145.2700      11.5        88       969        99
VIS    2025250    183200   23.2400  145.2300      11.6        92       944        93
VIS    2025250    183200   23.2400  145.2200      11.7        92       938        91
VIS    2025250    183200   23.2500  145.1800      11.3        93       926        97
VIS    2025250    183200   23.2600  145.1700      11.0        92       930        99
VIS    2025250    183200   23.2500  145.1300      10.4        91       964        97
VIS    2025250    183200   23.2600  145.1200      10.3        91       964        96
VIS    2025250    183200   23.2300  143.9700      11.2        90       982        98
VIS    2025250    183200   23.2300  143.9200      10.0        92       964        96
VIS    2025250    183200   23.2400  143.8400      11.1        94       987        98
VIS    2025250    183200   23.2500  143.8200      10.9        92       976        99
VIS    2025250    183200   23.2300  143.8000      10.8        92       957        98
VIS    2025250    183200   23.2500  143.7800      10.4        95       934        95
VIS    2025250    183200   23.2500  143.7600      10.0        96       936        92
VIS    2025250    183200   23.2500  143.7400       9.5        96       951        95
VIS    2025250    183200   23.2300  142.7200      11.2       100       981        97
VIS    2025250    183200   23.2200  142.7000      10.9        98       969        98
VIS    2025250    183200   23.2200  142.6800      10.6        97       959        98
VIS    2025250    183200   23.2200  142.6100       9.7        94       931        98
VIS    2025250    183200   23.2200  142.5900       9.7        96       923        97
VIS    2025250    183200   23.2300  142.5700      10.0        99       922        95
VIS    2025250    183200   23.2400  142.5400      10.5        99       927        93
VIS    2025250    183200   23.2300  142.5200      10.4        96       918        97
VIS    2025250    183200   23.2200  142.4800       9.5        94       917        99
VIS    2025250    183200   23.3100  151.6500       7.3        88       960        93
VIS    2025250    183200   23.3000  151.6300       7.3        86       935        95
VIS    2025250    183200   23.3200  151.6000       7.7        86       892        97
VIS    2025250    183200   23.2900  149.7200       9.0       115       887        94
VIS    2025250    183200   23.2800  149.6900       9.0       112       886        95
VIS    2025250    183200   23.2800  149.6300      10.0       115       890        94
VIS    2025250    183200   23.2700  149.5600      11.4       118       891        92
VIS    2025250    183200   23.2700  149.5300      10.6       119       903        92
VIS    2025250    183200   23.2700  149.5000       9.4       111       898        95
VIS    2025250    183200   23.2800  149.4900       8.7       108       883        97
VIS    2025250    183200   23.2800  149.4500       8.2       106       864        99
VIS    2025250    183200   23.2700  149.4400       7.9       108       864        98
VIS    2025250    183200   23.2800  149.4100       6.9       113       868        95
VIS    2025250    183200   23.2600  149.2400       6.3        98       828        91
VIS    2025250    183200   23.2500  148.1500       9.7        84       995        98
VIS    2025250    183200   23.2500  148.1400       9.8        84       964        98
VIS    2025250    183200   23.2600  147.8100       9.0       103       966        91
VIS    2025250    183200   23.2600  147.7700       8.1       108       964        90
VIS    2025250    183200   23.2600  147.7200       8.4       102       939        97
VIS    2025250    183200   23.2600  147.6900      10.4       100       909        92
VIS    2025250    183200   23.2600  147.6600      10.5        99       897        91
VIS    2025250    183200   23.2400  147.6200      10.7        99       887        93
VIS    2025250    183200   23.2400  147.6000      10.4       100       888        94
VIS    2025250    183200   23.2600  147.5600      10.1        92       890        98
VIS    2025250    183200   23.2500  147.5500       9.9        90       892        97
VIS    2025250    183200   23.2400  147.4300      10.5        83       894        93
VIS    2025250    183200   23.2400  147.4100       9.9        83       890        93
VIS    2025250    183200   23.2400  147.3700       9.4        83       894        93
VIS    2025250    183200   23.2400  147.3500       9.5        86       894        95
VIS    2025250    183200   23.2400  147.3100       9.6        91       892        97
VIS    2025250    183200   23.2400  147.2500       9.4        85       904        91
VIS    2025250    183200   23.2600  147.2400       8.8        89       895        90
VIS    2025250    183200   23.2500  147.1600       9.3        83       897        94
VIS    2025250    183200   23.2600  147.1400       9.0        86       896        96
VIS    2025250    183200   23.2400  147.1000       9.6        86       897        97
VIS    2025250    183200   23.2500  147.0700       9.7        87       897        97
VIS    2025250    183200   23.2500  147.0500       9.2        89       902        97
VIS    2025250    183200   23.2300  147.0400       9.1        87       902        95
VIS    2025250    183200   23.2500  147.0000       9.2        87       905        96
VIS    2025250    183200   23.2300  146.9800       9.0        86       917        97
VIS    2025250    183200   23.2500  146.9700       9.3        86       901        97
VIS    2025250    183200   23.2500  146.9300       9.5        85       900        97
VIS    2025250    183200   23.2300  146.8700       8.6        85       906        90
VIS    2025250    183200   23.2500  146.8600       8.7        81       900        95
VIS    2025250    183200   23.2300  146.7600       8.6        85       912        90
VIS    2025250    183200   23.2200  145.8200      10.3        91       920        99
VIS    2025250    183200   23.2200  145.8000      10.7        89       920        99
VIS    2025250    183200   23.2200  145.7900      10.7        88       920        98
VIS    2025250    183200   23.2400  145.7200      10.2        95       909        99
VIS    2025250    183200   23.2400  145.7200      10.2        94       905        99
VIS    2025250    183200   23.2200  145.6700       9.6        86       906        98
VIS    2025250    183200   23.2200  145.6700       9.6        87       906        98
VIS    2025250    183200   23.2300  145.6200       9.6        88       908        97
VIS    2025250    183200   23.2400  145.6200       9.6        88       908        98
VIS    2025250    183200   23.2200  145.5700       9.9        84       926        98
VIS    2025250    183200   23.2400  145.3400      11.0        86       998       100
VIS    2025250    183200   23.2100  145.3100      11.4        91       978        99
VIS    2025250    183200   23.2100  145.3000      11.8        92       974        99
VIS    2025250    183200   23.2200  145.2700      11.6        90       951        99
VIS    2025250    183200   23.2300  145.2500      11.5        90       944        97
VIS    2025250    183200   23.2300  145.2300      11.7        92       944        92
VIS    2025250    183200   23.2300  145.1900      11.7        94       924        96
VIS    2025250    183200   23.2300  145.1600      11.1        92       924        93
VIS    2025250    183200   23.2300  145.1500      10.9        91       926        92
VIS    2025250    183200   23.2200  145.1300      10.8        87       964        95
VIS    2025250    183200   23.2200  145.1000      10.6        88       987        98
VIS    2025250    183200   23.2200  143.9200      10.2        91       971        94
VIS    2025250    183200   23.2000  143.8800      10.8        89       994       100
VIS    2025250    183200   23.2000  143.8500      11.5        93       983        99
VIS    2025250    183200   23.2200  143.8300      11.4        94       982        98
VIS    2025250    183200   23.2000  142.6900      11.0        97       948        97
VIS    2025250    183200   23.2100  142.5900       9.6        95       922        98
VIS    2025250    183200   23.2100  142.5600      10.0        98       922        96
VIS    2025250    183200   23.1900  142.5100       9.5        93       919        98
VIS    2025250    183200   23.1900  142.5100       9.5        93       919        99
VIS    2025250    183200   23.1900  142.4800       9.5        93       917        99
VIS    2025250    183200   23.2800  151.6600       7.0        90       978        96
VIS    2025250    183200   23.2900  151.6300       6.9        87       960        95
VIS    2025250    183200   23.2500  149.7200       8.3       107       923        94
VIS    2025250    183200   23.2500  149.6900       8.0       111       903        97
VIS    2025250    183200   23.2600  149.6800       8.7       112       885        97
VIS    2025250    183200   23.2600  149.6200       9.9       114       890        95
VIS    2025250    183200   23.2600  149.5900      10.8       114       895        95
VIS    2025250    183200   23.2600  149.5800      11.2       114       895        93
VIS    2025250    183200   23.2600  149.5400      10.9       120       891        93
VIS    2025250    183200   23.2600  149.5300      10.7       120       902        92
VIS    2025250    183200   23.2600  149.4800       9.3       109       863        99
VIS    2025250    183200   23.2500  149.4700       8.9       107       863        98
VIS    2025250    183200   23.2600  149.4500       8.3       106       864        99
VIS    2025250    183200   23.2300  148.1500       9.4        87       964        99
VIS    2025250    183200   23.2200  148.1300       9.6        87       939        98
VIS    2025250    183200   23.2200  147.7800       8.1       101       975        96
VIS    2025250    183200   23.2400  147.7600       7.7       108       953        91
VIS    2025250    183200   23.2300  147.7400       7.8       106       946        92
VIS    2025250    183200   23.2200  147.7100       8.4        97       911        98
VIS    2025250    183200   23.2200  147.6900       9.0        94       903        98
VIS    2025250    183200   23.2200  147.6700       9.4        92       896        97
VIS    2025250    183200   23.2200  147.6400      10.9        94       893        94
VIS    2025250    183200   23.2400  147.6100      10.7        99       888        94
VIS    2025250    183200   23.2400  147.6000      10.5        99       888        94
VIS    2025250    183200   23.2200  147.5600      10.2        96       891        97
VIS    2025250    183200   23.2300  147.5400       9.8        91       893        96
VIS    2025250    183200   23.2300  147.5200       9.6        91       894        98
VIS    2025250    183200   23.2200  147.4800      10.4        94       895        96
VIS    2025250    183200   23.2300  147.4700      10.5        94       895        95
VIS    2025250    183200   23.2200  147.4400      10.6        87       895        93
VIS    2025250    183200   23.2200  147.4200      10.7        84       895        92
VIS    2025250    183200   23.2300  147.3900      10.1        82       894        93
VIS    2025250    183200   23.2300  147.3700       9.7        81       894        92
VIS    2025250    183200   23.2300  147.3400       9.6        86       896        95
VIS    2025250    183200   23.2200  147.3000       9.9        88       897        95
VIS    2025250    183200   23.2300  147.2700      10.0        86       902        94
VIS    2025250    183200   23.2300  147.2700      10.0        85       904        94
VIS    2025250    183200   23.2100  147.2000       9.0        83       902        92
VIS    2025250    183200   23.2300  147.1600       9.5        80       901        90
VIS    2025250    183200   23.2100  147.1300       9.0        85       900        94
VIS    2025250    183200   23.2300  147.1000       9.6        85       898        96
VIS    2025250    183200   23.2200  147.0900       9.6        84       899        95
VIS    2025250    183200   23.2100  147.0500       8.7        86       912        96
VIS    2025250    183200   23.2300  147.0400       9.1        87       912        96
VIS    2025250    183200   23.2300  146.9900       9.0        86       935        98
VIS    2025250    183200   23.2100  146.9800       9.0        87       935        98
VIS    2025250    183200   23.2100  146.9600       8.9        88       930        95
VIS    2025250    183200   23.2000  145.8500       9.6        85       924        98
VIS    2025250    183200   23.2100  145.8200      10.1        89       920        99
VIS    2025250    183200   23.2100  145.8000      10.7        87       920        99
VIS    2025250    183200   23.2100  145.7800      10.8        89       908        92
VIS    2025250    183200   23.2100  145.7600      10.6        92       902        93
VIS    2025250    183200   23.2000  145.7200       9.8        90       903        95
VIS    2025250    183200   23.2100  145.7100       9.7        87       905        93
VIS    2025250    183200   23.2100  145.6900       9.5        86       911        95
VIS    2025250    183200   23.2000  145.6500       9.3        86       911        95
VIS    2025250    183200   23.2000  145.6400       9.3        85       911        94
VIS    2025250    183200   23.2100  145.6000       9.8        84       918        95
VIS    2025250    183200   23.2100  145.5800      10.0        84       926        98
VIS    2025250    183200   23.2100  145.5700      10.0        83       931        98
VIS    2025250    183200   23.2000  145.3700      10.9        86       988        96
VIS    2025250    183200   23.1900  145.3400      11.3        89       983        98
VIS    2025250    183200   23.2000  145.3100      11.6        93       978        99
VIS    2025250    183200   23.2000  145.3000      11.8        94       974        99
VIS    2025250    183200   23.2100  145.2600      11.4        91       944        94
VIS    2025250    183200   23.2100  145.2600      11.3        92       940        91
VIS    2025250    183200   23.1900  145.2100      10.9        95       915        92
VIS    2025250    183200   23.1900  145.2000      10.7        94       915        96
VIS    2025250    183200   23.1900  145.1600      10.3        85       916        96
VIS    2025250    183200   23.1900  145.1500      10.5        84       916        95
VIS    2025250    183200   23.2000  143.9300      10.7        89       982        92
VIS    2025250    183200   23.2000  143.9000      10.3        89       994        96
VIS    2025250    183200   23.2000  143.8800      10.9        90       994       100
VIS    2025250    183200   23.1700  143.8500      11.0        93       984        98
VIS    2025250    183200   23.1700  143.8400      11.0        93       983        98
VIS    2025250    183200   23.1700  142.7200      10.2        91       985        98
VIS    2025250    183200   23.1700  142.6900      10.4        92       949        99
VIS    2025250    183200   23.1700  142.6800      10.3        93       938        98
VIS    2025250    183200   23.1900  142.6600      10.3        97       925        95
VIS    2025250    183200   23.1700  142.6200      10.0        97       955        92
VIS    2025250    183200   23.1700  142.6100       9.9        95       955        98
VIS    2025250    183200   23.1600  142.5900       9.5        93       951        99
VIS    2025250    183200   23.1700  142.5500       9.1        95       927        98
VIS    2025250    183200   23.1700  142.5200       9.2        94       925        98
VIS    2025250    183200   23.1900  142.5100       9.4        93       924        98
VIS    2025250    183200   23.1800  142.4900       9.5        93       917        98
VIS    2025250    183200   23.2500  151.6900       8.2        86       933        91
VIS    2025250    183200   23.2500  151.6800       8.3        87       914        92
VIS    2025250    183200   23.2600  151.6600       7.1        90       933        98
VIS    2025250    183200   23.2600  151.6200       5.6        89       953       100
VIS    2025250    183200   23.2400  151.0000       5.8       112       993        94
VIS    2025250    183200   23.2400  150.9700       6.3        99       996        90
VIS    2025250    183200   23.2500  150.9400       6.4       101       980        99
VIS    2025250    183200   23.2400  149.7500      10.2       110       914        91
VIS    2025250    183200   23.2400  149.7300       8.9       110       923        93
VIS    2025250    183200   23.2400  149.7000       7.9       110       922        94
VIS    2025250    183200   23.2400  149.6800       8.0       112       903        96
VIS    2025250    183200   23.2300  149.6300       9.5       114       864        96
VIS    2025250    183200   23.2200  149.6100       9.1       115       861        96
VIS    2025250    183200   23.2200  149.5000       9.9       120       858        90
VIS    2025250    183200   23.2300  149.4700       8.3       111       862        95
VIS    2025250    183200   23.2300  149.4400       7.1       106       874        90
VIS    2025250    183200   23.2300  149.2700       7.0       101       874        92
VIS    2025250    183200   23.2100  149.2300       7.2       112       871        96
VIS    2025250    183200   23.2000  148.2000      10.0        81       994        98
VIS    2025250    183200   23.2000  147.9700       9.3        92       974       100
VIS    2025250    183200   23.1900  147.8500       8.7        95       985        99
VIS    2025250    183200   23.1900  147.8100       7.8       102       963        95
VIS    2025250    183200   23.2000  147.7800       8.1       103       935        96
VIS    2025250    183200   23.1900  147.7700       8.2       103       922        94
VIS    2025250    183200   23.1900  147.7500       8.4       101       891        95
VIS    2025250    183200   23.2100  147.7200       8.3        97       905        99
VIS    2025250    183200   23.2100  147.7000       8.8        94       898        99
VIS    2025250    183200   23.2000  147.6700       9.3        93       896        98
VIS    2025250    183200   23.1900  147.6500       9.8        93       894        98
VIS    2025250    183200   23.1900  147.6100      10.4        94       890        97
VIS    2025250    183200   23.1900  147.5800      10.1        95       890        97
VIS    2025250    183200   23.2000  147.5600      10.2        97       891        95
VIS    2025250    183200   23.1900  147.5500      10.3        93       891        96
VIS    2025250    183200   23.1900  147.5200      10.1        90       893        96
VIS    2025250    183200   23.2000  147.4900      10.0        92       895        97
VIS    2025250    183200   23.2000  147.4700      10.5        91       895        96
VIS    2025250    183200   23.2000  147.4400      10.8        90       895        94
VIS    2025250    183200   23.2100  147.4100      10.9        87       896        93
VIS    2025250    183200   23.1900  147.3800      10.8        84       898        92
VIS    2025250    183200   23.2000  147.3600      10.3        83       898        91
VIS    2025250    183200   23.2000  147.3200       9.8        86       900        91
VIS    2025250    183200   23.1900  147.2800       9.6        83       905        92
VIS    2025250    183200   23.2000  147.2500       9.4        82       905        93
VIS    2025250    183200   23.2100  147.2200       8.6        85       903        91
VIS    2025250    183200   23.2000  147.2200       8.6        85       902        91
VIS    2025250    183200   23.2000  147.1800       9.5        85       901        93
VIS    2025250    183200   23.2000  147.1500       9.3        84       900        93
VIS    2025250    183200   23.1800  147.1200       9.2        89       902        91
VIS    2025250    183200   23.1800  147.1100       9.2        89       902        90
VIS    2025250    183200   23.2000  147.0700       8.7        84       902        92
VIS    2025250    183200   23.1700  145.8800      10.1        91       966        99
VIS    2025250    183200   23.1700  145.8600      10.1        85       966        98
VIS    2025250    183200   23.1700  145.8400      10.4        81       924        98
VIS    2025250    183200   23.1700  145.8000      10.4        82       905        98
VIS    2025250    183200   23.1700  145.7800      10.2        85       904        97
VIS    2025250    183200   23.1800  145.7500      10.0        89       903        97
VIS    2025250    183200   23.1700  145.7400       9.7        87       905        94
VIS    2025250    183200   23.1800  145.7200       9.5        87       912        95
VIS    2025250    183200   23.1900  145.6800       9.5        84       935        95
VIS    2025250    183200   23.1800  145.6600       9.4        84       935        94
VIS    2025250    183200   23.1900  145.6300       9.2        84       917        92
VIS    2025250    183200   23.1700  145.6100      10.1        80       943        96
VIS    2025250    183200   23.1900  145.5700       9.8        82       929        94
VIS    2025250    183200   23.1700  145.5600       9.9        84       945        98
VIS    2025250    183200   23.1700  145.3700      11.0        85       988        93
VIS    2025250    183200   23.1800  145.3300      11.6        93       979        97
VIS    2025250    183200   23.1700  145.3000      11.9        93       967        97
VIS    2025250    183200   23.1800  145.2900      11.9        94       954        97
VIS    2025250    183200   23.1700  145.2600      11.3        94       925        91
VIS    2025250    183200   23.1800  145.2100      10.6        95       915        94
VIS    2025250    183200   23.1700  145.1800       9.8        88       914        96
VIS    2025250    183200   23.1600  145.1500       9.7        83       916        97
VIS    2025250    183200   23.1700  145.1400       9.7        84       921        97
VIS    2025250    183200   23.1500  143.9000      10.1        87       995        91
VIS    2025250    183200   23.1700  143.8500      11.0        92       984        97
VIS    2025250    183200   23.1500  142.7200      10.4        90       985        98
VIS    2025250    183200   23.1600  142.6900      10.4        90       949        99
VIS    2025250    183200   23.1400  142.6600      10.1        94       938        98
VIS    2025250    183200   23.1600  142.6600      10.1        95       938        97
VIS    2025250    183200   23.1500  142.6300      10.0        97       951        92
VIS    2025250    183200   23.1400  142.5900       9.7        93       939        98
VIS    2025250    183200   23.1400  142.5800       9.5        92       951        97
VIS    2025250    183200   23.1600  142.5400       8.9        94       949        96
VIS    2025250    183200   23.1500  142.5100       9.1        93       929        96
VIS    2025250    183200   23.1400  142.5000       9.3        91       929        97
VIS    2025250    183200   23.1400  142.4800       9.7        92       920        98
VIS    2025250    183200   23.2300  151.7300       7.3        89       942        96
VIS    2025250    183200   23.2400  151.7000       8.0        87       933        93
VIS    2025250    183200   23.2500  151.6800       8.3        86       889        95
VIS    2025250    183200   23.2400  151.6500       6.7        85       883        96
VIS    2025250    183200   23.2500  151.6400       6.3        90       883        99
VIS    2025250    183200   23.2500  151.6100       5.4        91       953        96
VIS    2025250    183200   23.2100  150.9600       5.9       100       965        98
VIS    2025250    183200   23.2200  150.9500       6.5        97       980        99
VIS    2025250    183200   23.2300  150.9300       6.3        98       980        98
VIS    2025250    183200   23.2000  149.6200       9.2       116       864        93
VIS    2025250    183200   23.2100  149.6000       9.1       116       861        95
VIS    2025250    183200   23.2100  149.4900       9.4       120       852        91
VIS    2025250    183200   23.1900  149.3800       6.4       103       914        94
VIS    2025250    183200   23.1900  149.2500       7.9       112       907        97
VIS    2025250    183200   23.2000  149.2300       7.3       113       885        96
VIS    2025250    183200   23.1900  149.2000       7.9       109       885        90
VIS    2025250    183200   23.1900  149.1900       7.6       108       883        90
VIS    2025250    183200   23.1700  147.9700       9.2        91       988       100
VIS    2025250    183200   23.1700  147.9600       9.3        91       978       100
VIS    2025250    183200   23.1900  147.9000       9.1        96       946        95
VIS    2025250    183200   23.1900  147.8900       9.1        95       946        95
VIS    2025250    183200   23.1900  147.8500       8.3        93       985        99
VIS    2025250    183200   23.1800  147.8400       8.0        97       980        97
VIS    2025250    183200   23.1700  147.8100       8.1       104       923        94
VIS    2025250    183200   23.1900  147.7900       8.1       103       935        95
VIS    2025250    183200   23.1700  147.7500       8.5       103       891        93
VIS    2025250    183200   23.1600  147.7300       8.9       100       887        95
VIS    2025250    183200   23.1700  147.6900       8.9        95       890        99
VIS    2025250    183200   23.1700  147.6700       8.9        94       894        99
VIS    2025250    183200   23.1700  147.6600       9.1        94       894        98
VIS    2025250    183200   23.1700  147.6400       9.6        94       892        98
VIS    2025250    183200   23.1700  147.5900      10.3        95       890        96
VIS    2025250    183200   23.1700  147.5800      10.1        94       890        97
VIS    2025250    183200   23.1600  147.5500      10.3        90       892        97
VIS    2025250    183200   23.1800  147.5200      10.2        90       893        96
VIS    2025250    183200   23.1800  147.4900      10.3        89       896        96
VIS    2025250    183200   23.1700  147.4800      10.5        90       896        96
VIS    2025250    183200   23.1700  147.4400      10.3        93       897        95
VIS    2025250    183200   23.1800  147.4300      10.6        92       896        94
VIS    2025250    183200   23.1700  147.3900      10.3        85       900        90
VIS    2025250    183200   23.1700  147.3800      10.5        85       900        92
VIS    2025250    183200   23.1800  147.3500      10.1        84       900        92
VIS    2025250    183200   23.1800  147.3300      10.0        85       900        90
VIS    2025250    183200   23.1600  147.2800       9.2        84       904        92
VIS    2025250    183200   23.1600  147.2800       9.2        84       904        93
VIS    2025250    183200   23.1600  147.2300       9.3        85       905        94
VIS    2025250    183200   23.1700  147.2100       9.0        86       903        96
VIS    2025250    183200   23.1600  147.2000       9.0        86       906        97
VIS    2025250    183200   23.1600  147.1700       8.9        88       903        97
VIS    2025250    183200   23.1700  147.1500       9.4        90       902        96
VIS    2025250    183200   23.1800  147.1200       9.3        90       902        91
VIS    2025250    183200   23.1800  147.0700       8.8        85       915        91
VIS    2025250    183200   23.1500  145.9200      10.2        89       961        97
VIS    2025250    183200   23.1400  145.8800       9.9        96       955        97
VIS    2025250    183200   23.1400  145.8600      10.0        95       955        98
VIS    2025250    183200   23.1400  145.8300      10.4        85       918        98
VIS    2025250    183200   23.1500  145.8200      10.6        82       922        98
VIS    2025250    183200   23.1500  145.8000      10.6        83       908        98
VIS    2025250    183200   23.1500  145.7600      10.2        85       905        94
VIS    2025250    183200   23.1600  145.7400       9.7        86       905        93
VIS    2025250    183200   23.1600  145.7200       9.5        86       912        94
VIS    2025250    183200   23.1600  145.6800       9.4        83       943        98
VIS    2025250    183200   23.1600  145.6700       9.3        83       943        97
VIS    2025250    183200   23.1400  145.6400       9.7        83       943        95
VIS    2025250    183200   23.1400  145.6100      10.7        79       951        96
VIS    2025250    183200   23.1600  145.6000      10.2        80       945        96
VIS    2025250    183200   23.1400  145.3700      12.0        87       999        99
VIS    2025250    183200   23.1400  145.3500      11.6        89       999        99
VIS    2025250    183200   23.1400  145.3300      11.7        91       982       100
VIS    2025250    183200   23.1400  145.3000      11.8        92       937        99
VIS    2025250    183200   23.1400  145.2800      11.7        93       923        98
VIS    2025250    183200   23.1500  145.2600      11.2        93       916        94
VIS    2025250    183200   23.1500  145.2100      10.5        90       915        96
VIS    2025250    183200   23.1600  145.1700       9.7        85       914        96
VIS    2025250    183200   23.1600  145.1500       9.6        83       916        97
VIS    2025250    183200   23.1200  143.3500       9.8        96       999        92
VIS    2025250    183200   23.1200  143.2900       9.9        96       982        97
VIS    2025250    183200   23.1200  143.2600       9.2        92       968        97
VIS    2025250    183200   23.1300  142.7200      11.3        95       979        97
VIS    2025250    183200   23.1300  142.7000      10.3        91       949        96
VIS    2025250    183200   23.1300  142.6700      10.2        93       935        96
VIS    2025250    183200   23.1200  142.6600      10.0        94       934        95
VIS    2025250    183200   23.1200  142.6300       9.5        96       917        96
VIS    2025250    183200   23.1300  142.5900       9.7        93       919        98
VIS    2025250    183200   23.1300  142.5900       9.7        92       919        98
VIS    2025250    183200   23.1300  142.5600       9.4        92       951        97
VIS    2025250    183200   23.1300  142.5200       9.3        89       948        96
VIS    2025250    183200   23.1200  142.5000       9.4        88       948        97
VIS    2025250    183200   23.1300  142.4700       9.9        93       919        99
VIS    2025250    183200   23.2000  151.9000       7.4        82       970        90
VIS    2025250    183200   23.2000  151.8700       7.4        90       982        96
VIS    2025250    183200   23.2100  151.8600       7.2        90       982        96
VIS    2025250    183200   23.2000  151.8300       7.6        99       982        90
VIS    2025250    183200   23.2000  151.7400       7.8        88       942        93
VIS    2025250    183200   23.2000  151.7300       7.6        88       927        95
VIS    2025250    183200   23.2100  151.7100       7.5        90       914        96
VIS    2025250    183200   23.2000  151.6800       6.7        86       857        99
VIS    2025250    183200   23.2200  151.6500       6.3        78       852        97
VIS    2025250    183200   23.2000  151.6200       5.6        74       866        93
VIS    2025250    183200   23.2200  151.5800       6.2        87       990        91
VIS    2025250    183200   23.2000  151.5500       7.1        93       994        96
VIS    2025250    183200   23.1900  150.9600       5.5       104       956        91
VIS    2025250    183200   23.1900  150.9300       6.0        99       965        96
VIS    2025250    183200   23.1900  150.7700       5.3       100       954        90
VIS    2025250    183200   23.1900  149.6200       9.5       116       875        90
VIS    2025250    183200   23.1700  149.5500       9.5       114       860        92
VIS    2025250    183200   23.1800  149.4900       7.7       113       852        92
VIS    2025250    183200   23.1800  149.3900       6.5       105       912        93
VIS    2025250    183200   23.1800  149.3800       6.5       104       912        95
VIS    2025250    183200   23.1800  149.2600       7.7       112       917        95
VIS    2025250    183200   23.1800  149.2400       8.2       110       917        96
VIS    2025250    183200   23.1800  149.2000       8.1       108       903        94
VIS    2025250    183200   23.1800  149.2000       8.0       108       903        94
VIS    2025250    183200   23.1500  148.2500       9.5        89       961        99
VIS    2025250    183200   23.1400  148.0500       8.9        87       988        99
VIS    2025250    183200   23.1400  148.0000       8.9        88       988       100
VIS    2025250    183200   23.1500  147.9700       9.1        91       978        99
VIS    2025250    183200   23.1600  147.9600       9.3        91       978       100
VIS    2025250    183200   23.1400  147.9200       9.3        90       972        99
VIS    2025250    183200   23.1400  147.9100       9.2        91       972        99
VIS    2025250    183200   23.1500  147.8800       8.6        92       972        98
VIS    2025250    183200   23.1600  147.8400       8.7        98       962        97
VIS    2025250    183200   23.1500  147.8200       8.7       103       914        93
VIS    2025250    183200   23.1600  147.7900       8.1       103       923        94
VIS    2025250    183200   23.1400  147.7800       8.0       101       883        95
VIS    2025250    183200   23.1500  147.7500       8.5       101       900        95
VIS    2025250    183200   23.1500  147.7300       8.8       100       885        94
VIS    2025250    183200   23.1400  147.6900       8.8        96       887        94
VIS    2025250    183200   23.1500  147.6800       8.9        95       887        95
VIS    2025250    183200   23.1500  147.6600       9.1        95       887        97
VIS    2025250    183200   23.1600  147.6300       9.8        96       890        97
VIS    2025250    183200   23.1500  147.5800      10.3        96       890        93
VIS    2025250    183200   23.1500  147.5800      10.3        95       890        94
VIS    2025250    183200   23.1600  147.5400      10.4        89       893        96
VIS    2025250    183200   23.1400  147.5200      10.8        91       896        97
VIS    2025250    183200   23.1500  147.4900      10.8        89       896        96
VIS    2025250    183200   23.1600  147.4600      10.3        89       898        95
VIS    2025250    183200   23.1600  147.4500      10.2        90       898        95
VIS    2025250    183200   23.1500  147.4300       9.3        84       900        92
VIS    2025250    183200   23.1600  147.4000       9.8        85       900        91
VIS    2025250    183200   23.1300  147.3600      10.3        86       901        95
VIS    2025250    183200   23.1500  147.3500      10.3        87       900        94
VIS    2025250    183200   23.1300  147.3100       9.7        89       906        98
VIS    2025250    183200   23.1400  147.2800       9.2        85       907        93
VIS    2025250    183200   23.1500  147.2500       9.4        87       907        91
VIS    2025250    183200   23.1400  147.2500       9.2        88       913        91
VIS    2025250    183200   23.1500  147.2000       8.9        86       906        96
VIS    2025250    183200   23.1500  147.2000       8.9        85       906        96
VIS    2025250    183200   23.1400  147.1700       8.5        85       919        94
VIS    2025250    183200   23.1500  147.1200       9.2        90       916        92
VIS    2025250    183200   23.1400  147.1200       9.4        89       916        93
VIS    2025250    183200   23.1200  146.0900       9.1       100       954        93
VIS    2025250    183200   23.1200  146.0800       9.3        99       936        94
VIS    2025250    183200   23.1300  146.0400       9.1       100       931        95
VIS    2025250    183200   23.1300  146.0200       8.0       106       912        91
VIS    2025250    183200   23.1200  145.9800       9.9        94       906        99
VIS    2025250    183200   23.1300  145.9700       9.5        98       904        97
VIS    2025250    183200   23.1200  145.9400      10.1        89       908        97
VIS    2025250    183200   23.1200  145.9000      10.1        91       935        96
VIS    2025250    183200   23.1200  145.9000      10.1        93       921        94
VIS    2025250    183200   23.1200  145.8500      10.1        95       910        94
VIS    2025250    183200   23.1400  145.8300      10.4        87       912        98
VIS    2025250    183200   23.1300  145.8200      10.6        86       910        97
VIS    2025250    183200   23.1400  145.8000      10.5        83       908        96
VIS    2025250    183200   23.1300  145.7700      10.6        84       905        95
VIS    2025250    183200   23.1300  145.7400      10.7        83       908        93
VIS    2025250    183200   23.1300  145.7200      10.6        83       915        95
VIS    2025250    183200   23.1300  145.7000      10.1        82       916        98
VIS    2025250    183200   23.1300  145.6600       9.3        82       943        95
VIS    2025250    183200   23.1300  145.6400       9.7        83       943        95
VIS    2025250    183200   23.1300  145.6200      10.9        79       949        97
VIS    2025250    183200   23.1100  145.5900      11.0        80       959        99
VIS    2025250    183200   23.1200  145.3800      12.1        87       999        99
VIS    2025250    183200   23.1300  145.3700      12.0        87       999        99
VIS    2025250    183200   23.1100  145.3400      11.4        89       999       100
VIS    2025250    183200   23.1300  145.3100      11.5        92       972        99
VIS    2025250    183200   23.1300  145.3000      11.7        92       937        99
VIS    2025250    183200   23.1200  145.2700      11.4        90       918       100
VIS    2025250    183200   23.1100  145.2400      10.7        89       916        98
VIS    2025250    183200   23.1100  145.2200      10.6        92       916        95
VIS    2025250    183200   23.1200  145.1800       9.6        88       915        98
VIS    2025250    183200   23.0900  143.3700      10.5        96       987        97
VIS    2025250    183200   23.0900  143.3500      10.4        96       947        98
VIS    2025250    183200   23.0900  143.3200      10.1        95       947        99
VIS    2025250    183200   23.0900  143.2900       9.9        96       933        98
VIS    2025250    183200   23.0900  143.2900      10.0        96       933        97
VIS    2025250    183200   23.0900  143.2600       9.6        94       942        96
VIS    2025250    183200   23.1000  143.2400       9.5        92       979        95
VIS    2025250    183200   23.1000  142.7300      12.5        97       983        96
VIS    2025250    183200   23.0900  142.7100      11.8        94       962        98
VIS    2025250    183200   23.1100  142.7000      11.1        94       935        98
VIS    2025250    183200   23.1000  142.6600      10.0        95       917        92
VIS    2025250    183200   23.0900  142.6400       9.9        95       912        93
VIS    2025250    183200   23.0900  142.6200       9.6        95       911        98
VIS    2025250    183200   23.0900  142.5800       9.6        93       911        99
VIS    2025250    183200   23.0900  142.5600       9.6        93       917        99
VIS    2025250    183200   23.1100  142.5400       9.3        91       955        92
VIS    2025250    183200   23.1100  142.5100       9.2        88       955        93
VIS    2025250    183200   23.1000  142.4900       9.5        88       948        96
VIS    2025250    183200   23.1000  142.4600       9.7        91       926        98
VIS    2025250    183200   23.1800  151.9000       7.8        85       959        93
VIS    2025250    183200   23.1900  151.8900       7.5        90       958        94
VIS    2025250    183200   23.1900  151.8600       7.5        95       930        92
VIS    2025250    183200   23.1800  151.8100       7.4       100       972        92
VIS    2025250    183200   23.1800  151.7700       7.7        89       965        92
VIS    2025250    183200   23.1900  151.7500       8.0        86       942        91
VIS    2025250    183200   23.2000  151.7400       7.9        87       942        92
VIS    2025250    183200   23.1800  151.7100       7.8        87       862        96
VIS    2025250    183200   23.1700  151.6800       6.5        85       857        97
VIS    2025250    183200   23.2000  151.6700       6.2        84       857        98
VIS    2025250    183200   23.1700  151.6200       6.1        96       897        97
VIS    2025250    183200   23.1900  151.6100       5.6        77       897        94
VIS    2025250    183200   23.1900  151.5700       6.8        93       994        97
VIS    2025250    183200   23.1700  151.1400       7.8       101       951        95
VIS    2025250    183200   23.1700  151.1300       7.8       101       951        95
VIS    2025250    183200   23.1600  151.0900       5.8        97       922        97
VIS    2025250    183200   23.1600  151.0800       5.8        97       888        96
VIS    2025250    183200   23.1700  150.9500       5.7       100       922        98
VIS    2025250    183200   23.1600  150.9200       4.9        94       922        91
VIS    2025250    183200   23.1600  150.8300       4.5        95       952        96
VIS    2025250    183200   23.1600  150.8200       4.4       102       952        93
VIS    2025250    183200   23.1500  149.9900       6.2       104       969        92
VIS    2025250    183200   23.1500  149.5700       8.8       112       863        95
VIS    2025250    183200   23.1400  149.5300       8.0       105       858        97
VIS    2025250    183200   23.1400  149.5200       7.5       104       851        94
VIS    2025250    183200   23.1500  149.3600       6.5       111       873        91
VIS    2025250    183200   23.1300  149.2400       8.5       108       963        93
VIS    2025250    183200   23.1300  149.2200       8.0       108       962        95
VIS    2025250    183200   23.1400  149.2100       7.8       108       962        92
VIS    2025250    183200   23.1200  148.3000       9.6        85      1000        97
VIS    2025250    183200   23.1200  148.2600       9.2        89       961       100
VIS    2025250    183200   23.1200  148.0700       8.8        92       978        99
VIS    2025250    183200   23.1200  148.0500       8.9        92       978       100
VIS    2025250    183200   23.1200  148.0200       9.0        91       976       100
VIS    2025250    183200   23.1300  148.0000       8.9        89       978       100
VIS    2025250    183200   23.1300  147.9900       9.0        92       968        98
VIS    2025250    183200   23.1200  147.9500       9.1        96       966        96
VIS    2025250    183200   23.1200  147.9200       9.2        95       959        99
VIS    2025250    183200   23.1400  147.9100       9.2        92       971       100
VIS    2025250    183200   23.1200  147.8800       8.9       104       912        90
VIS    2025250    183200   23.1300  147.7800       8.0       100       883        94
VIS    2025250    183200   23.1300  147.7600       8.2        97       886        93
VIS    2025250    183200   23.1200  147.7200       8.9        96       886        95
VIS    2025250    183200   23.1300  147.6800       8.9        95       887        93
VIS    2025250    183200   23.1100  147.6600       9.5        96       890        95
VIS    2025250    183200   23.1300  147.6300       9.6        95       890        97
VIS    2025250    183200   23.1200  147.6200       9.5        93       890        96
VIS    2025250    183200   23.1300  147.5900      10.0        94       890        96
VIS    2025250    183200   23.1300  147.5600      10.3        91       893        96
VIS    2025250    183200   23.1100  147.5300      10.7        94       897        97
VIS    2025250    183200   23.1100  147.5000      10.6        94       899        98
VIS    2025250    183200   23.1200  147.4900      10.4        93       899        97
VIS    2025250    183200   23.1200  147.4500       9.8        85       900        93
VIS    2025250    183200   23.1100  147.4300       9.3        82       900        91
VIS    2025250    183200   23.1100  147.4100       9.8        82       900        91
VIS    2025250    183200   23.1100  147.3800      10.7        81       900        92
VIS    2025250    183200   23.1300  147.3500      10.2        87       901        96
VIS    2025250    183200   23.1200  147.3400      10.0        88       902        97
VIS    2025250    183200   23.1100  147.3100       9.5        82       907        93
VIS    2025250    183200   23.1200  147.2900       9.4        82       918        95
VIS    2025250    183200   23.1200  147.2600       9.4        82       922        94
VIS    2025250    183200   23.1300  147.2400       9.1        84       929        91
VIS    2025250    183200   23.1300  147.2000       8.7        82       929        90
VIS    2025250    183200   23.1200  147.1800       8.5        82       927        91
VIS    2025250    183200   23.1300  147.1600       8.3        85       922        92
VIS    2025250    183200   23.1200  147.1300       8.9        85       927        92
VIS    2025250    183200   23.1000  146.1300       8.4        92       908        92
VIS    2025250    183200   23.1000  146.1300       8.5        90       908        94
VIS    2025250    183200   23.1000  146.1000       9.3        91       928        97
VIS    2025250    183200   23.1100  146.0700      10.0        93       928        97
VIS    2025250    183200   23.1100  146.0400      10.3        93       911        97
VIS    2025250    183200   23.0900  146.0100      11.0        85       907        97
VIS    2025250    183200   23.1100  145.9900      10.3        90       906        98
VIS    2025250    183200   23.1100  145.9700      10.7        88       906        99
VIS    2025250    183200   23.0900  145.9500      10.5        82       908        98
VIS    2025250    183200   23.1100  145.9100       9.8        89       908        98
VIS    2025250    183200   23.0900  145.9000       9.9        91       908        99
VIS    2025250    183200   23.0900  145.8600      10.2        89       906        97
VIS    2025250    183200   23.0900  145.8300      10.1        80       906        94
VIS    2025250    183200   23.1100  145.8100      10.1        84       908        93
VIS    2025250    183200   23.1100  145.8000      10.1        84       907        94
VIS    2025250    183200   23.0900  145.7500      10.5        84       907        97
VIS    2025250    183200   23.1000  145.7400      10.9        84       907        97
VIS    2025250    183200   23.0900  145.7200      11.0        83       908        96
VIS    2025250    183200   23.0900  145.6900      10.8        81       922        97
VIS    2025250    183200   23.1000  145.6700      10.1        80       924        96
VIS    2025250    183200   23.1000  145.6400       9.7        85       929        96
VIS    2025250    183200   23.0900  145.6100      10.2        80       939        98
VIS    2025250    183200   23.1100  145.5800      10.7        81       964        99
VIS    2025250    183200   23.1100  145.5700      10.5        81       964        99
VIS    2025250    183200   23.1000  145.3800      11.8        88       999       100
VIS    2025250    183200   23.1000  145.3400      11.4        89       999        99
VIS    2025250    183200   23.0800  145.3200      11.2        90       967        99
VIS    2025250    183200   23.0900  145.3000      11.1        90       940        99
VIS    2025250    183200   23.0900  145.2800      11.2        87       918       100
VIS    2025250    183200   23.0800  145.2500      10.9        85       918       100
VIS    2025250    183200   23.0800  145.2400      10.5        85       918        98
VIS    2025250    183200   23.1000  145.1700       8.9        87       920        95
VIS    2025250    183200   23.0700  143.3600      10.2        91       962       100
VIS    2025250    183200   23.0800  143.3600      10.3        94       962        99
VIS    2025250    183200   23.0900  143.3200      10.2        95       933        98
VIS    2025250    183200   23.0900  143.3000       9.9        95       933        98
VIS    2025250    183200   23.0900  143.2800      10.0        95       928        97
VIS    2025250    183200   23.0900  143.2600       9.7        94       928        96
VIS    2025250    183200   23.0800  143.2300       9.7        93       968        97
VIS    2025250    183200   23.0700  143.2000       9.1        91       975        96
VIS    2025250    183200   23.0800  143.1600       9.2        83       977        92
VIS    2025250    183200   23.0800  142.7500      10.3        96       983        93
VIS    2025250    183200   23.0800  142.7200      11.1        92       962        98
VIS    2025250    183200   23.0700  142.7000      11.0        90       941        99
VIS    2025250    183200   23.0800  142.6700      10.2        95       914        97
VIS    2025250    183200   23.0800  142.6400      10.0        94       912        95
VIS    2025250    183200   23.0800  142.6100       9.6        94       911        99
VIS    2025250    183200   23.0800  142.6000       9.6        93       911        99
VIS    2025250    183200   23.0800  142.5800       9.4        93       911        99
VIS    2025250    183200   23.0700  142.5500       8.9        97       920        92
VIS    2025250    183200   23.0800  142.4800       9.5        89       964        94
VIS    2025250    183200   23.1500  151.9000       8.2        89       967        90
VIS    2025250    183200   23.1600  151.8800       7.9        92       959        90
VIS    2025250    183200   23.1600  151.8500       7.5        95       914        92
VIS    2025250    183200   23.1600  151.8300       7.3        96       914        92
VIS    2025250    183200   23.1700  151.8100       7.5        99       951        91
VIS    2025250    183200   23.1700  151.7700       7.7        90       965        95
VIS    2025250    183200   23.1500  151.7600       7.8        89       889        95
VIS    2025250    183200   23.1600  151.7200       7.9        87       862        96
VIS    2025250    183200   23.1700  151.7100       7.6        86       862        97
VIS    2025250    183200   23.1700  151.6800       6.6        85       857        98
VIS    2025250    183200   23.1600  151.6600       5.9        85       872        94
VIS    2025250    183200   23.1400  151.1500       7.3        99       951        97
VIS    2025250    183200   23.1400  151.1300       7.4       100       922        98
VIS    2025250    183200   23.1500  151.1100       6.8        95       888        98
VIS    2025250    183200   23.1600  151.0900       6.0        96       888        96
VIS    2025250    183200   23.1600  151.0500       5.6        94       875        94
VIS    2025250    183200   23.1600  151.0400       5.6        93       875        94
VIS    2025250    183200   23.1500  151.0000       4.4        96       877        93
VIS    2025250    183200   23.1400  150.9800       4.6        97       881        94
VIS    2025250    183200   23.1400  150.9600       5.4        99       904        94
VIS    2025250    183200   23.1600  150.9200       4.9        94       917        90
VIS    2025250    183200   23.1200  150.0100       6.1       102       989        95
VIS    2025250    183200   23.1200  149.5800       9.2       111       863        92
VIS    2025250    183200   23.1300  149.5500       8.6       107       860        98
VIS    2025250    183200   23.1300  149.5200       7.7       103       858        96
VIS    2025250    183200   23.1200  149.3600       7.1       112       865        90
VIS    2025250    183200   23.1000  148.3300      10.3        92       986        99
VIS    2025250    183200   23.1200  148.3000       9.5        85      1000        97
VIS    2025250    183200   23.0900  148.2800       9.1        87       987        99
VIS    2025250    183200   23.1000  148.1200      11.0       101       996        94
VIS    2025250    183200   23.0900  148.0900       9.7        97       996        98
VIS    2025250    183200   23.1100  148.0600       9.0        95       978        99
VIS    2025250    183200   23.1100  148.0500       9.0        94       978        99
VIS    2025250    183200   23.0900  148.0200       9.2        97       957        99
VIS    2025250    183200   23.0900  147.9900       9.3       100       939        94
VIS    2025250    183200   23.0900  147.9700       9.4       101       932        93
VIS    2025250    183200   23.0900  147.9300       9.5       102       923        90
VIS    2025250    183200   23.0900  147.9200       9.5       102       878        90
VIS    2025250    183200   23.0900  147.7500       8.9        92       886        97
VIS    2025250    183200   23.1100  147.7200       9.1        95       887        95
VIS    2025250    183200   23.0900  147.6800       9.8        95       889        98
VIS    2025250    183200   23.1000  147.6700       9.7        96       890        96
VIS    2025250    183200   23.1100  147.6300       9.5        94       891        96
VIS    2025250    183200   23.1000  147.6000       9.3        90       897        98
VIS    2025250    183200   23.0900  147.5900       9.3        89       897        98
VIS    2025250    183200   23.1000  147.5700       9.6        92       897        98
VIS    2025250    183200   23.0800  147.5200      10.8        96       902        97
VIS    2025250    183200   23.1000  147.5100      10.7        95       900        97
VIS    2025250    183200   23.0900  147.4800       9.5        92       901        96
VIS    2025250    183200   23.0800  147.4700       9.1        90       901        97
VIS    2025250    183200   23.0900  147.4400       9.3        85       900        92
VIS    2025250    183200   23.0900  147.4100      10.2        85       899        90
VIS    2025250    183200   23.1000  147.3800      10.7        81       900        92
VIS    2025250    183200   23.0900  147.3600      10.2        82       901        94
VIS    2025250    183200   23.1000  147.3200       9.5        82       903        94
VIS    2025250    183200   23.0900  147.3100       9.5        79       906        93
VIS    2025250    183200   23.1000  147.2900       9.5        76       918        92
VIS    2025250    183200   23.1000  147.2600       9.7        76       929        93
VIS    2025250    183200   23.0900  147.2200       9.1        75       936        92
VIS    2025250    183200   23.0800  147.1500       8.6        82       931        91
VIS    2025250    183200   23.0700  146.1100       9.7        90       908        99
VIS    2025250    183200   23.0900  146.0900       9.8        89       911        98
VIS    2025250    183200   23.0700  146.0600      11.6        95       911        98
VIS    2025250    183200   23.0700  146.0500      11.5        95       911        99
VIS    2025250    183200   23.0700  146.0200      10.9        86       907        97
VIS    2025250    183200   23.0900  146.0000      11.2        83       907        96
VIS    2025250    183200   23.0800  145.9700      10.8        81       907        97
VIS    2025250    183200   23.0700  145.9300      10.0        82       908        97
VIS    2025250    183200   23.0700  145.9100      10.3        85       908        99
VIS    2025250    183200   23.0700  145.9000      10.4        87       908        99
VIS    2025250    183200   23.0900  145.8500      10.3        84       906        96
VIS    2025250    183200   23.0900  145.8300      10.2        78       906        94
VIS    2025250    183200   23.0700  145.8100      10.1        80       906        96
VIS    2025250    183200   23.0700  145.7800       9.8        84       906        97
VIS    2025250    183200   23.0800  145.7600      10.4        84       907        97
VIS    2025250    183200   23.0700  145.7300      10.7        83       908        97
VIS    2025250    183200   23.0600  145.7200      10.7        84       917        97
VIS    2025250    183200   23.0600  145.6900      10.7        83       923        96
VIS    2025250    183200   23.0800  145.6700      10.5        82       924        98
VIS    2025250    183200   23.0800  145.6400       9.8        83       929        96
VIS    2025250    183200   23.0800  145.6200       9.9        82       929        97
VIS    2025250    183200   23.0700  145.3100      11.1        90       967        98
VIS    2025250    183200   23.0700  145.2900      11.1        90       943        98
VIS    2025250    183200   23.0600  145.2600      10.9        85       935        99
VIS    2025250    183200   23.0400  143.4000       9.7        87       962        98
VIS    2025250    183200   23.0600  143.3700      10.0        89       962       100
VIS    2025250    183200   23.0600  143.3500      10.4        92       948        97
VIS    2025250    183200   23.0600  143.3200      10.3        93       926        95
VIS    2025250    183200   23.0600  143.3000      10.0        92       928        94
VIS    2025250    183200   23.0600  143.2800      10.0        92       928        94
VIS    2025250    183200   23.0500  143.2500      10.2        92       930        96
VIS    2025250    183200   23.0400  143.2100       9.8        93       958        98
VIS    2025250    183200   23.0500  143.2100       9.6        92       966        98
VIS    2025250    183200   23.0600  143.1700       9.0        85       977        96
VIS    2025250    183200   23.0400  142.7300       9.9        89       976        96
VIS    2025250    183200   23.0400  142.7000      10.3        88       951        99
VIS    2025250    183200   23.0400  142.6800      10.0        91       919        98
VIS    2025250    183200   23.0500  142.6700      10.0        92       915        97
VIS    2025250    183200   23.0400  142.6300      10.0        90       910        99
VIS    2025250    183200   23.0600  142.6200      10.0        92       910        99
VIS    2025250    183200   23.0400  142.5900       9.7        89       910        98
VIS    2025250    183200   23.0600  142.5700       9.0        91       912        97
VIS    2025250    183200   23.0600  142.5100       8.8        94       949        92
VIS    2025250    183200   23.0300  142.4800       9.3        88       963        99
VIS    2025250    183200   23.0300  142.4700       9.3        89       974        99
VIS    2025250    183200   23.1500  151.9000       8.2        90       967        91
VIS    2025250    183200   23.1500  151.8900       8.1        90       967        91
VIS    2025250    183200   23.1400  151.8600       7.6        89       923        93
VIS    2025250    183200   23.1400  151.8200       7.5        89       889        91
VIS    2025250    183200   23.1300  151.8100       7.7        89       889        92
VIS    2025250    183200   23.1400  151.7900       7.8        88       889        95
VIS    2025250    183200   23.1400  151.7500       7.8        89       873        95
VIS    2025250    183200   23.1400  151.7200       7.9        89       856        96
VIS    2025250    183200   23.1400  151.6900       7.3        87       862        97
VIS    2025250    183200   23.1400  151.6600       6.8        87       878        95
VIS    2025250    183200   23.1300  151.6500       6.5        93       878        95
VIS    2025250    183200   23.1200  151.6300       6.5        97       910        93
VIS    2025250    183200   23.1100  151.1800       7.3        82       945        94
VIS    2025250    183200   23.1200  151.1600       7.2        96       870        97
VIS    2025250    183200   23.1300  151.1400       7.3        99       870        94
VIS    2025250    183200   23.1300  151.1100       6.8        93       869        97
VIS    2025250    183200   23.1200  151.0400       6.2        89       863        92
VIS    2025250    183200   23.1300  150.9500       5.8       100       912        93
VIS    2025250    183200   23.1300  150.9500       5.9       101       912        94
VIS    2025250    183200   23.1100  150.8500       4.0        96       941        94
VIS    2025250    183200   23.1100  150.8200       4.5       102       929        94
VIS    2025250    183200   23.1100  149.5600       9.4       106       860        97
VIS    2025250    183200   23.1100  149.5300       8.4       105       860        97
VIS    2025250    183200   23.0900  149.5100       7.7       107       854        96
VIS    2025250    183200   23.0900  149.2700       8.1       116       901        91
VIS    2025250    183200   23.0700  148.3600       9.7        95       986       100
VIS    2025250    183200   23.0700  148.3300      10.0        90       986       100
VIS    2025250    183200   23.0700  148.3100       9.5        87       953        99
VIS    2025250    183200   23.0700  148.2900       9.1        86       951        98
VIS    2025250    183200   23.0900  148.2200       9.4        87       900        93
VIS    2025250    183200   23.0800  148.1900       9.3        94       949        97
VIS    2025250    183200   23.0700  148.1500       9.8        99       995        96
VIS    2025250    183200   23.0800  148.1200      10.3       102       995        96
VIS    2025250    183200   23.0700  148.1100      10.6       102       995        95
VIS    2025250    183200   23.0700  148.0800      10.0       100       915        97
VIS    2025250    183200   23.0700  148.0500       9.7        98       926        98
VIS    2025250    183200   23.0900  148.0200       9.3        98       957        98
VIS    2025250    183200   23.0900  148.0100       9.4        98       954        97
VIS    2025250    183200   23.0900  147.9800       9.4       102       932        92
VIS    2025250    183200   23.0700  147.7100       9.3        93       888        99
VIS    2025250    183200   23.0600  147.7000       9.2        94       888        99
VIS    2025250    183200   23.0800  147.6800       9.7        94       889        98
VIS    2025250    183200   23.0700  147.6400       9.5        97       893        96
VIS    2025250    183200   23.0800  147.6200       9.5        95       897        97
VIS    2025250    183200   23.0800  147.5900       9.2        90       898        98
VIS    2025250    183200   23.0800  147.5800       9.2        91       901        99
VIS    2025250    183200   23.0600  147.5500       9.9        95       911        98
VIS    2025250    183200   23.0700  147.5100      10.6        94       908        97
VIS    2025250    183200   23.0600  147.5000      10.0        93       910        99
VIS    2025250    183200   23.0800  147.4800       9.3        92       903        98
VIS    2025250    183200   23.0600  147.4400       9.1        89       901        97
VIS    2025250    183200   23.0600  147.4200       9.6        91       900        98
VIS    2025250    183200   23.0600  147.3800      10.2        92       900        98
VIS    2025250    183200   23.0600  147.3600       9.8        87       902        97
VIS    2025250    183200   23.0700  147.3500       9.7        84       902        96
VIS    2025250    183200   23.0600  147.3300       9.3        87       903        97
VIS    2025250    183200   23.0600  147.3000       9.6        85       906        96
VIS    2025250    183200   23.0600  147.2700       9.6        84       907        96
VIS    2025250    183200   23.0600  147.2300       8.8        84       934        95
VIS    2025250    183200   23.0400  146.2300       9.0        98       921        97
VIS    2025250    183200   23.0500  146.1000      10.2        90       900        99
VIS    2025250    183200   23.0400  146.1000      10.6        89       900        99
VIS    2025250    183200   23.0600  146.0700      11.7        95       912        97
VIS    2025250    183200   23.0600  146.0500      11.5        95       911        98
VIS    2025250    183200   23.0600  146.0100      10.7        85       907        97
VIS    2025250    183200   23.0600  145.9800      10.6        83       906        96
VIS    2025250    183200   23.0500  145.9500       9.8        84       907        98
VIS    2025250    183200   23.0600  145.9300      10.0        83       908        97
VIS    2025250    183200   23.0500  145.9200      10.2        83       909        98
VIS    2025250    183200   23.0500  145.9000      10.6        84       909        98
VIS    2025250    183200   23.0400  145.8600      10.0        82       908        97
VIS    2025250    183200   23.0400  145.8400       9.8        85       908        98
VIS    2025250    183200   23.0400  145.8200       9.9        84       909        98
VIS    2025250    183200   23.0600  145.7800       9.8        84       909        98
VIS    2025250    183200   23.0400  145.7600      10.4        84       915        98
VIS    2025250    183200   23.0400  145.7300      10.8        83       922        97
VIS    2025250    183200   23.0600  145.7100      10.7        84       922        97
VIS    2025250    183200   23.0500  145.6900      10.4        84       925        96
VIS    2025250    183200   23.0500  145.2800      10.9        88       943        96
VIS    2025250    183200   23.0300  145.2400      11.1        85       962        96
VIS    2025250    183200   23.0200  143.4100       9.5        86       991        92
VIS    2025250    183200   23.0400  143.3900       9.9        88       962        99
VIS    2025250    183200   23.0300  143.3800      10.2        87       962        99
VIS    2025250    183200   23.0300  143.3500      10.5        88       949        96
VIS    2025250    183200   23.0200  143.3200      10.4        88       952        96
VIS    2025250    183200   23.0200  143.3000       9.9        92       949        94
VIS    2025250    183200   23.0200  143.2800       9.8        96       944        94
VIS    2025250    183200   23.0200  143.2600      10.1        97       944        96
VIS    2025250    183200   23.0400  143.2100      10.0        94       954        98
VIS    2025250    183200   23.0100  143.1900      10.8       101       961        96
VIS    2025250    183200   23.0100  143.1600      10.5        98       967        96
VIS    2025250    183200   23.0200  143.1600      10.3        95       968        95
VIS    2025250    183200   23.0300  142.7100      10.7        89       970        94
VIS    2025250    183200   23.0300  142.6900      10.4        89       926        97
VIS    2025250    183200   23.0300  142.6700      10.2        89       926        98
VIS    2025250    183200   23.0200  142.6400       9.9        87       915        99
VIS    2025250    183200   23.0100  142.6000      10.3        87       912       100
VIS    2025250    183200   23.0200  142.5900      10.2        88       912       100
VIS    2025250    183200   23.0100  142.5500       9.7        96       912        99
VIS    2025250    183200   23.0300  142.5300       8.9        96       920        95
VIS    2025250    183200   23.0100  142.5000       9.9        95       925        98
VIS    2025250    183200   23.0200  142.4800       9.4        88       949        99
VIS    2025250    183200   23.0300  142.4700       9.3        88       963        99
VIS    2025250    183200   23.1000  151.8000       7.7        85       889        90
VIS    2025250    183200   23.1200  151.7700       8.0        85       873        94
VIS    2025250    183200   23.1100  151.7500       8.1        86       853        92
VIS    2025250    183200   23.1100  151.7200       7.4        86       853        96
VIS    2025250    183200   23.1100  151.6900       7.2        90       862        97
VIS    2025250    183200   23.1100  151.6600       6.9        91       878        97
VIS    2025250    183200   23.1200  151.6300       6.4        95       905        96
VIS    2025250    183200   23.1100  151.6200       6.5        96       910        94
VIS    2025250    183200   23.0900  151.2100       7.1        84       945        95
VIS    2025250    183200   23.0900  151.1900       7.0        81       871        96
VIS    2025250    183200   23.1000  151.1700       7.1        85       870        97
VIS    2025250    183200   23.1000  151.1300       6.7        92       869        93
VIS    2025250    183200   23.1000  151.1200       6.5        90       869        91
VIS    2025250    183200   23.1100  150.9600       5.3       101       944        91
VIS    2025250    183200   23.0800  150.9400       5.8       102       953        99
VIS    2025250    183200   23.0800  150.9100       5.4        97       953        96
VIS    2025250    183200   23.0600  149.6200      11.5       110       902        91
VIS    2025250    183200   23.0800  149.6000      11.2       113       898        92
VIS    2025250    183200   23.0800  149.5500       9.7       104       861        99
VIS    2025250    183200   23.0800  149.5400       9.1       105       861        99
VIS    2025250    183200   23.0800  149.5100       7.7       105       860        99
VIS    2025250    183200   23.0600  149.4800       7.0       101       860        95
VIS    2025250    183200   23.0800  149.4600       6.5       100       864        93
VIS    2025250    183200   23.0700  149.3700       7.5       111       865        91
VIS    2025250    183200   23.0600  149.3400       8.1       120       867        93
VIS    2025250    183200   23.0600  149.3200       8.6       118       880        92
VIS    2025250    183200   23.0600  149.3100       8.3       118       880        92
VIS    2025250    183200   23.0700  149.2800       8.1       116       884        92
VIS    2025250    183200   23.0700  149.2400       7.0       107       899        92
VIS    2025250    183200   23.0400  148.3800       9.5        92       987        98
VIS    2025250    183200   23.0500  148.3400       9.7        90       970       100
VIS    2025250    183200   23.0500  148.3200       9.8        88       951        99
VIS    2025250    183200   23.0400  148.3000       9.6        87       905        94
VIS    2025250    183200   23.0500  148.1700      10.0       101       995        97
VIS    2025250    183200   23.0400  148.1400       9.7        97       970        99
VIS    2025250    183200   23.0600  148.1200      10.0       100       951        98
VIS    2025250    183200   23.0500  148.1000       9.9       100       915        96
VIS    2025250    183200   23.0400  148.0700       9.9        99       858        92
VIS    2025250    183200   23.0600  148.0500       9.9        99       907        97
VIS    2025250    183200   23.0600  148.0300       9.8        98       907        93
VIS    2025250    183200   23.0500  147.7300       9.6        91       887        98
VIS    2025250    183200   23.0400  147.7100       9.3        93       890        98
VIS    2025250    183200   23.0400  147.6900       9.2        96       890        96
VIS    2025250    183200   23.0600  147.6700       9.4        97       890        96
VIS    2025250    183200   23.0400  147.6200       9.5        93       894        99
VIS    2025250    183200   23.0400  147.6000       9.6        92       907        99
VIS    2025250    183200   23.0400  147.5900       9.6        92       907        99
VIS    2025250    183200   23.0500  147.5300      10.0        94       918        96
VIS    2025250    183200   23.0400  147.5000       9.5        92       922        96
VIS    2025250    183200   23.0400  147.4900       9.2        91       922        97
VIS    2025250    183200   23.0400  147.4500       9.0        89       910        98
VIS    2025250    183200   23.0400  147.4400       9.3        90       906        98
VIS    2025250    183200   23.0400  147.3700       9.9        93       905        97
VIS    2025250    183200   23.0500  147.3600       9.8        91       904        98
VIS    2025250    183200   23.0400  147.3300       9.2        90       916        97
VIS    2025250    183200   23.0500  147.3000       9.6        87       906        97
VIS    2025250    183200   23.0200  146.2200       9.1       103       908        90
VIS    2025250    183200   23.0200  146.1500       9.0       104       882        98
VIS    2025250    183200   23.0200  146.1300       9.2        97       886        97
VIS    2025250    183200   23.0200  146.1200      10.2        87       899        99
VIS    2025250    183200   23.0300  146.0900      10.8        89       907       100
VIS    2025250    183200   23.0200  146.0700      10.7        91       907       100
VIS    2025250    183200   23.0200  146.0300       9.9        87       907        96
VIS    2025250    183200   23.0200  146.0200      10.0        87       907        97
VIS    2025250    183200   23.0100  145.9800      10.2        90       906        99
VIS    2025250    183200   23.0100  145.9500      10.1        87       909        99
VIS    2025250    183200   23.0200  145.9200      10.1        84       911        94
VIS    2025250    183200   23.0200  145.9200      10.2        83       911        93
VIS    2025250    183200   23.0300  145.8900      10.5        82       910        95
VIS    2025250    183200   23.0300  145.8600      10.0        82       908        97
VIS    2025250    183200   23.0100  145.8300       9.8        87       913        97
VIS    2025250    183200   23.0200  145.8100       9.9        86       913        98
VIS    2025250    183200   23.0200  145.7800      10.3        84       925        98
VIS    2025250    183200   23.0300  145.7500      10.5        83       933        98
VIS    2025250    183200   23.0200  145.7300      10.3        80       954        95
VIS    2025250    183200   23.0300  145.6800       9.6        81       938        92
VIS    2025250    183200   23.0300  145.2500      10.9        85       973        97
VIS    2025250    183200   23.0100  143.3900      10.5        90       960        93
VIS    2025250    183200   23.0100  143.3800      10.6        90       958        91
VIS    2025250    183200   23.0100  143.3400      10.4        87       951        92
VIS    2025250    183200   23.0000  143.3300      10.5        89       953        94
VIS    2025250    183200   23.0100  143.2900       9.9        99       955        91
VIS    2025250    183200   23.0000  143.2800      10.2       103       957        92
VIS    2025250    183200   23.0100  143.1600      10.4        98       967        97
VIS    2025250    183200   23.0000  142.6200      10.0        87       915       100
VIS    2025250    183200   23.0000  142.6000      10.5        89       914       100
VIS    2025250    183200   23.0000  142.5300      10.1        98       918        97
VIS    2025250    183200   23.0000  142.4900      10.1        96       929        98
VIS    2025250    183200   22.9800  142.4600       9.6        94       960        99
VIS    2025250    183200   23.0700  151.8300       8.1        86       917        90
VIS    2025250    183200   23.0800  151.8200       7.8        85       907        91
VIS    2025250    183200   23.0900  151.7900       7.8        83       873        91
VIS    2025250    183200   23.0900  151.7700       8.1        82       853        94
VIS    2025250    183200   23.0700  151.7200       7.2        75       853        97
VIS    2025250    183200   23.0800  151.7000       6.3        75       856        97
VIS    2025250    183200   23.0800  151.6900       6.3        79       856        98
VIS    2025250    183200   23.0800  151.6400       6.8        89       860        95
VIS    2025250    183200   23.0800  151.2100       6.9        87       945        94
VIS    2025250    183200   23.0700  151.1900       6.5        85       890        95
VIS    2025250    183200   23.0700  150.9400       4.8        98       930        95
VIS    2025250    183200   23.0700  150.9400       5.0        99       930        96
VIS    2025250    183200   23.0600  150.9000       4.6        93       930        91
VIS    2025250    183200   23.0400  149.6100      10.5       100       903        95
VIS    2025250    183200   23.0400  149.6000      10.2        99       898        97
VIS    2025250    183200   23.0500  149.5600       9.5       105       864        99
VIS    2025250    183200   23.0500  149.5300       9.0       105       863       100
VIS    2025250    183200   23.0500  149.5200       8.4       107       862        99
VIS    2025250    183200   23.0500  149.4900       7.7       105       861        95
VIS    2025250    183200   23.0600  149.4800       7.1       101       861        94
VIS    2025250    183200   23.0300  149.3500       8.0       119       869        91
VIS    2025250    183200   23.0300  149.3000       8.8       117       890        94
VIS    2025250    183200   23.0300  149.2900       8.7       116       890        94
VIS    2025250    183200   23.0300  148.4100       9.5        93       898        93
VIS    2025250    183200   23.0200  148.3800       9.4        90       898        94
VIS    2025250    183200   23.0200  148.3700       9.3        88       898        94
VIS    2025250    183200   23.0300  148.3400       9.3        88       911        97
VIS    2025250    183200   23.0300  148.3300       9.5        88       881        92
VIS    2025250    183200   23.0300  148.2900       9.6        87       905        93
VIS    2025250    183200   23.0400  148.2800       9.2        87       905        93
VIS    2025250    183200   23.0200  148.2500       9.6        87       971        90
VIS    2025250    183200   23.0400  148.2200       9.9        85       971        99
VIS    2025250    183200   23.0200  148.1800      10.0       100       980        98
VIS    2025250    183200   23.0200  148.1600       9.9        99       970        98
VIS    2025250    183200   23.0300  148.1300       9.6        96       931        99
VIS    2025250    183200   23.0100  148.1000       9.4        95       883        98
VIS    2025250    183200   23.0100  148.1000       9.5        95       840        95
VIS    2025250    183200   23.0300  148.0700       9.9        98       829        93
VIS    2025250    183200   23.0300  147.7200       9.6        92       889        97
VIS    2025250    183200   23.0300  147.7100       9.4        92       889        97
VIS    2025250    183200   23.0200  147.6700       9.4        93       890        95
VIS    2025250    183200   23.0100  147.6500       9.6        90       890        97
VIS    2025250    183200   23.0200  147.6200       9.8        91       892        98
VIS    2025250    183200   23.0200  147.6100       9.7        92       897        98
VIS    2025250    183200   23.0200  147.5800       9.2        96       910        98
VIS    2025250    183200   23.0100  147.5400       8.3        93       933        96
VIS    2025250    183200   23.0100  147.5300       8.3        92       934        96
VIS    2025250    183200   23.0300  147.4700       9.1        90       922        95
VIS    2025250    183200   23.0200  147.4500       9.1        89       922        90
VIS    2025250    183200   23.0000  146.1800      10.0        90       872        96
VIS    2025250    183200   23.0000  146.1400       9.9        90       892        99
VIS    2025250    183200   22.9900  146.1300      10.0        87       901        99
VIS    2025250    183200   23.0000  146.0900       9.9        87       907        98
VIS    2025250    183200   22.9900  146.0500       9.1        87       909        95
VIS    2025250    183200   22.9900  146.0500       9.2        86       907        96
VIS    2025250    183200   22.9900  146.0200       9.9        86       909        95
VIS    2025250    183200   22.9900  145.9900      10.2        86       907        98
VIS    2025250    183200   22.9900  145.9600      10.2        85       909        98
VIS    2025250    183200   23.0100  145.9400      10.2        87       909        98
VIS    2025250    183200   23.0100  145.9200      10.2        84       911        94
VIS    2025250    183200   22.9900  145.8900      10.6        87       911        96
VIS    2025250    183200   23.0000  145.8500      10.1        88       914        96
VIS    2025250    183200   23.0000  145.8400       9.8        87       927        93
VIS    2025250    183200   23.0000  145.8200      10.0        86       927        96
VIS    2025250    183200   23.0100  145.7800      10.4        84       928        96
VIS    2025250    183200   22.9900  145.7700      10.7        83       945        92
VIS    2025250    183200   22.9900  145.7400      10.7        81       968        97
VIS    2025250    183200   22.9900  145.2500      11.0        88       961        96
VIS    2025250    183200   22.9600  142.8900       9.9        91       999        99
VIS    2025250    183200   22.9600  142.8700       9.8        90       999        99
VIS    2025250    183200   22.9600  142.8300       9.7        90      1000        99
VIS    2025250    183200   22.9700  142.4600       9.6        95       960        99
VIS    2025250    183200   23.0700  151.8200       8.0        84       916        92
VIS    2025250    183200   23.0700  151.7800       8.0        78       856        96
VIS    2025250    183200   23.0500  151.7700       8.6        78       856        93
VIS    2025250    183200   23.0500  151.7300       7.5        77       855        97
VIS    2025250    183200   23.0700  151.7100       6.5        71       856        96
VIS    2025250    183200   23.0600  151.6900       6.2        74       855        97
VIS    2025250    183200   23.0600  151.6500       6.9        88       860        97
VIS    2025250    183200   23.0500  151.4900       6.5        88       996        98
VIS    2025250    183200   23.0400  151.4800       6.4        88       996        98
VIS    2025250    183200   23.0500  151.4500       5.9        94       989        97
VIS    2025250    183200   23.0500  151.1900       6.5        87       928        90
VIS    2025250    183200   23.0300  151.0200       4.8       101       950        96
VIS    2025250    183200   23.0500  150.8400       4.1        95       937        91
VIS    2025250    183200   23.0200  149.9500      11.5       119       891        91
VIS    2025250    183200   23.0400  149.9300      11.8       116       895        90
VIS    2025250    183200   23.0300  149.6100      10.1        97       903        96
VIS    2025250    183200   23.0300  149.6000       9.8        98       898        98
VIS    2025250    183200   23.0100  149.5800       9.1       102       873       100
VIS    2025250    183200   23.0300  149.5400       9.3       104       864        99
VIS    2025250    183200   23.0200  149.5200       9.2       105       864        98
VIS    2025250    183200   23.0200  149.4800       7.7       107       863        91
VIS    2025250    183200   23.0200  149.4400       6.8       104       863        92
VIS    2025250    183200   23.0100  149.4200       7.0       102       866        96
VIS    2025250    183200   23.0100  149.3900       7.2       102       868        97
VIS    2025250    183200   23.0300  149.3500       7.8       119       870        91
VIS    2025250    183200   23.0100  149.3100       9.0       110       903        97
VIS    2025250    183200   23.0300  149.2900       8.7       115       890        95
VIS    2025250    183200   23.0100  148.4500       9.1        94       998        92
VIS    2025250    183200   22.9900  148.4100       8.9        90       934        96
VIS    2025250    183200   23.0100  148.3800       9.2        89       898        92
VIS    2025250    183200   23.0000  148.3700       9.2        88       898        92
VIS    2025250    183200   23.0000  148.3300       9.2        89       879        90
VIS    2025250    183200   23.0100  148.2900       9.7        87       936        95
VIS    2025250    183200   23.0000  148.2700       9.6        85       966        95
VIS    2025250    183200   23.0000  148.2300       9.5        95       994        99
VIS    2025250    183200   23.0000  148.2200       9.7        96       994        99
VIS    2025250    183200   22.9900  148.1800       9.9        96       926        99
VIS    2025250    183200   23.0000  148.1700      10.0        97       926        98
VIS    2025250    183200   22.9900  148.1300      10.0        95       919        98
VIS    2025250    183200   22.9900  148.1000       9.8        93       887        98
VIS    2025250    183200   23.0000  148.0900       9.7        94       863        96
VIS    2025250    183200   22.9900  147.7300       9.6        95       889        93
VIS    2025250    183200   22.9900  147.7000       9.5        94       889        97
VIS    2025250    183200   23.0000  147.6800       9.4        92       890        97
VIS    2025250    183200   22.9900  147.6600       9.6        89       889        97
VIS    2025250    183200   22.9800  147.6300       9.9        91       890        97
VIS    2025250    183200   22.9800  147.5900       9.5        93       897        98
VIS    2025250    183200   22.9800  147.5800       8.7        93       902        96
VIS    2025250    183200   22.9800  147.5500       8.1        93       910        91
VIS    2025250    183200   23.0000  147.5300       8.2        91       933        97
VIS    2025250    183200   22.9800  147.5100       8.2        88       933        97
VIS    2025250    183200   22.9800  147.4700       8.5        84       962        98
VIS    2025250    183200   22.9800  146.2400       9.3       116       886        91
VIS    2025250    183200   22.9800  146.2000       8.9       100       872        95
VIS    2025250    183200   22.9700  146.1600      10.4        89       885        99
VIS    2025250    183200   22.9900  146.1400      10.1        88       900        99
VIS    2025250    183200   22.9700  146.1100      10.0        87       907        98
VIS    2025250    183200   22.9700  146.1000      10.0        87       907        98
VIS    2025250    183200   22.9700  146.0800       9.6        87       911        95
VIS    2025250    183200   22.9600  146.0300       9.9        87       926        97
VIS    2025250    183200   22.9700  146.0300       9.9        87       914        96
VIS    2025250    183200   22.9600  145.9900      10.0        86       911        95
VIS    2025250    183200   22.9700  145.9600      10.4        84       911        96
VIS    2025250    183200   22.9800  145.9500      10.4        84       911        97
VIS    2025250    183200   22.9700  145.9300      10.6        82       915        95
VIS    2025250    183200   22.9700  145.7500      12.0        81       969        91
VIS    2025250    183200   22.9600  145.7400      11.5        75       968        92
VIS    2025250    183200   22.9600  145.2800      10.7        87       999        90
VIS    2025250    183200   22.9700  145.2500      11.4        89       996        99
VIS    2025250    183200   22.9600  145.2500      11.6        88       996       100
VIS    2025250    183200   22.9400  142.9800       9.9        99       991        97
VIS    2025250    183200   22.9400  142.9600       9.5        98       991        97
VIS    2025250    183200   22.9400  142.9500       9.7        98       981        96
VIS    2025250    183200   22.9300  142.9200      10.4        97       981        98
VIS    2025250    183200   22.9400  142.8800      10.3        93       968        99
VIS    2025250    183200   22.9300  142.8600       9.8        90       955        99
VIS    2025250    183200   22.9500  142.4600       9.5        98       962        97
VIS    2025250    183200   23.0200  151.9200       7.4        80       982        95
VIS    2025250    183200   23.0300  151.8800       7.9        71       956        91
VIS    2025250    183200   23.0300  151.8100       8.9        81       912        91
VIS    2025250    183200   23.0300  151.7700       9.0        77       856        90
VIS    2025250    183200   23.0300  151.7200       6.8        76       855        96
VIS    2025250    183200   23.0400  151.7200       6.8        75       856        97
VIS    2025250    183200   23.0200  151.5100       6.5        85       975        95
VIS    2025250    183200   23.0300  151.4900       6.7        87       996        97
VIS    2025250    183200   23.0300  151.4700       6.2        88       981        95
VIS    2025250    183200   23.0400  151.4600       6.0        91       989        98
VIS    2025250    183200   23.0300  151.4300       6.1        96       980        99
VIS    2025250    183200   23.0100  151.3900       6.3        97       978        99
VIS    2025250    183200   23.0200  151.3800       6.2        97       980        99
VIS    2025250    183200   23.0100  151.1700       7.1        86       971        93
VIS    2025250    183200   23.0200  151.1500       6.6        86       965        91
VIS    2025250    183200   23.0100  151.1100       5.0        90       965        92
VIS    2025250    183200   23.0100  151.1100       4.9        89       948        94
VIS    2025250    183200   23.0200  151.0200       4.7        98       950        96
VIS    2025250    183200   23.0300  150.9900       4.7        94       950        91
VIS    2025250    183200   23.0300  150.9700       4.5        95       883        93
VIS    2025250    183200   23.0100  150.9500       4.6        95       862        94
VIS    2025250    183200   23.0100  149.9400      11.8       119       891        90
VIS    2025250    183200   23.0100  149.6800       9.6       113       919        90
VIS    2025250    183200   22.9900  149.6700       9.1       110       915        91
VIS    2025250    183200   22.9900  149.6400       8.8       102       919        94
VIS    2025250    183200   22.9800  149.5900       8.4       106       941        91
VIS    2025250    183200   22.9800  149.5800       8.6       108       894        99
VIS    2025250    183200   22.9900  149.5600       8.8       105       873       100
VIS    2025250    183200   22.9900  149.5400       9.1       103       867        98
VIS    2025250    183200   22.9800  149.4900       8.2       101       864        97
VIS    2025250    183200   23.0000  149.4700       7.5       105       863        90
VIS    2025250    183200   22.9900  149.4400       7.2       106       866        94
VIS    2025250    183200   23.0000  149.4100       7.2       103       866        97
VIS    2025250    183200   23.0000  149.4000       7.3       103       868        98
VIS    2025250    183200   22.9900  149.3800       7.7       107       872        94
VIS    2025250    183200   22.9800  149.3300       8.4       105       903        98
VIS    2025250    183200   23.0000  149.3200       8.8       109       913        96
VIS    2025250    183200   22.9900  149.2900       8.3       115       902        90
VIS    2025250    183200   22.9900  149.2000       7.9       101       974        92
VIS    2025250    183200   22.9700  148.4400       8.6        89       934        99
VIS    2025250    183200   22.9900  148.4100       8.8        90       934        97
VIS    2025250    183200   22.9800  148.3700       9.3        86       878        90
VIS    2025250    183200   22.9900  148.2800       9.9        86       966        96
VIS    2025250    183200   22.9800  148.2700       9.6        87       996        98
VIS    2025250    183200   22.9600  148.2300       9.7        96       937        98
VIS    2025250    183200   22.9600  148.2000      10.1        97       910        97
VIS    2025250    183200   22.9600  148.1700      10.1        96       907        98
VIS    2025250    183200   22.9600  148.1500      10.0        94       907        98
VIS    2025250    183200   22.9600  148.1300      10.1        92       909        98
VIS    2025250    183200   22.9600  148.1100      10.0        91       909        98
VIS    2025250    183200   22.9600  148.0900       9.7        90       885        95
VIS    2025250    183200   22.9600  147.7900       8.1        88       789        90
VIS    2025250    183200   22.9800  147.7200       9.4        95       889        97
VIS    2025250    183200   22.9800  147.7000       9.4        93       889        98
VIS    2025250    183200   22.9600  147.6700      10.1        91       888        96
VIS    2025250    183200   22.9600  147.6500      10.2        92       889        95
VIS    2025250    183200   22.9600  147.6100       9.7        92       897        97
VIS    2025250    183200   22.9700  147.5900       9.1        91       908        95
VIS    2025250    183200   22.9700  147.5800       8.7        91       908        94
VIS    2025250    183200   22.9800  147.5100       8.3        88       924        97
VIS    2025250    183200   22.9800  147.5000       8.3        86       933        97
VIS    2025250    183200   22.9600  147.4700       9.1        84       923        96
VIS    2025250    183200   22.9400  146.4000       6.7       115       832        90
VIS    2025250    183200   22.9400  146.3100       6.4       101       851        95
VIS    2025250    183200   22.9600  146.2300       9.0        97       898        95
VIS    2025250    183200   22.9400  146.2200       9.5        89       917        96
VIS    2025250    183200   22.9400  146.1800       9.5        90       905        97
VIS    2025250    183200   22.9400  146.1500      10.1        89       906        96
VIS    2025250    183200   22.9500  146.1000      10.1        88       937        90
VIS    2025250    183200   22.9400  146.0100      10.3        88       926        92
VIS    2025250    183200   22.9600  145.9700      10.2        85       928        91
VIS    2025250    183200   22.9500  145.9100      10.9        80       925        90
VIS    2025250    183200   22.9300  145.4100      12.5        88      1000        99
VIS    2025250    183200   22.9400  145.3800      11.9        90       994        99
VIS    2025250    183200   22.9400  145.3700      11.8        91       994       100
VIS    2025250    183200   22.9300  145.3300      11.6        90       972        98
VIS    2025250    183200   22.9400  145.3300      11.4        89       985        97
VIS    2025250    183200   22.9300  145.2800      11.0        82       988        98
VIS    2025250    183200   22.9400  145.2400      11.6        87       996        98
VIS    2025250    183200   22.9100  143.0000      10.7        99       998        97
VIS    2025250    183200   22.9100  142.9900      10.2        98       991        98
VIS    2025250    183200   22.9200  142.9600       9.7        96       980        98
VIS    2025250    183200   22.9100  142.9300       9.9        94       969        99
VIS    2025250    183200   22.9100  142.9100      10.7        95       953        98
VIS    2025250    183200   22.9200  142.8800      10.5        94       953        99
VIS    2025250    183200   22.9100  142.8500       9.9        93       929        98
VIS    2025250    183200   23.0000  151.9500       5.5        86       989        99
VIS    2025250    183200   23.0000  151.9300       6.7        83       984        97
VIS    2025250    183200   23.0000  151.9000       7.3        79       948        95
VIS    2025250    183200   23.0100  151.8800       7.9        74       882        96
VIS    2025250    183200   23.0100  151.8700       8.1        75       882        95
VIS    2025250    183200   23.0100  151.8300       8.9        79       916        90
VIS    2025250    183200   23.0000  151.8100       9.1        78       881        92
VIS    2025250    183200   23.0100  151.6900       5.9        84       862        90
VIS    2025250    183200   22.9900  151.5600       7.0        93       973        97
VIS    2025250    183200   23.0100  151.5300       6.2        86       948        98
VIS    2025250    183200   23.0100  151.5000       6.5        85       981        95
VIS    2025250    183200   23.0000  151.4600       6.3        89       980        95
VIS    2025250    183200   22.9900  151.4500       6.4        92       978        94
VIS    2025250    183200   23.0000  151.4200       6.5        94       968        95
VIS    2025250    183200   23.0100  151.3800       6.2        95       968        99
VIS    2025250    183200   22.9900  151.3600       6.2        89       960        96
VIS    2025250    183200   22.9900  151.3500       6.4        89       960        92
VIS    2025250    183200   22.9800  151.1800       6.8        82       933        95
VIS    2025250    183200   22.9900  151.1600       6.7        83       931        95
VIS    2025250    183200   23.0000  151.1000       4.7        88       947        90
VIS    2025250    183200   22.9800  151.0300       5.5        95       968        93
VIS    2025250    183200   23.0000  150.9100       4.1        96       856        91
VIS    2025250    183200   22.9800  149.6600       9.3       109       884        94
VIS    2025250    183200   22.9800  149.6400       8.9       101       919        95
VIS    2025250    183200   22.9600  149.6000       8.0       103       912        99
VIS    2025250    183200   22.9600  149.5700       8.5       111       890        98
VIS    2025250    183200   22.9700  149.5200       8.7       108       867        90
VIS    2025250    183200   22.9800  149.4900       7.8       101       865        97
VIS    2025250    183200   22.9800  149.4500       7.1       106       867        94
VIS    2025250    183200   22.9600  149.4300       7.7       111       871        97
VIS    2025250    183200   22.9600  149.4000       8.0       113       872        93
VIS    2025250    183200   22.9800  149.3900       8.0       109       872        98
VIS    2025250    183200   22.9600  149.3400       8.1       103       881        94
VIS    2025250    183200   22.9600  149.3200       8.4       108       893        95
VIS    2025250    183200   22.9500  149.3100       7.8       109       881        90
VIS    2025250    183200   22.9700  149.2100       7.0       102       927        93
VIS    2025250    183200   22.9400  148.4700       9.2        85       985        99
VIS    2025250    183200   22.9600  148.4400       8.6        88       931        99
VIS    2025250    183200   22.9500  148.4100       8.8        87       896        94
VIS    2025250    183200   22.9600  148.4100       8.9        87       896        93
VIS    2025250    183200   22.9500  148.3000       9.4        86       989        96
VIS    2025250    183200   22.9400  148.2700       9.5        91       985        99
VIS    2025250    183200   22.9400  148.2400       9.5        92       937       100
VIS    2025250    183200   22.9600  148.2100      10.0        97       909        98
VIS    2025250    183200   22.9600  148.2000      10.1        97       909        97
VIS    2025250    183200   22.9400  148.1800      10.2        98       924        97
VIS    2025250    183200   22.9400  148.1400       9.8        91       925        97
VIS    2025250    183200   22.9600  148.1200      10.0        91       907        98
VIS    2025250    183200   22.9400  148.0800       9.6        90       902        96
VIS    2025250    183200   22.9300  147.8100       8.4        91       796        90
VIS    2025250    183200   22.9300  147.7300       9.6        97       887        92
VIS    2025250    183200   22.9500  147.7200       9.4        95       889        94
VIS    2025250    183200   22.9400  147.6900      10.0        93       886        95
VIS    2025250    183200   22.9400  147.6700      10.5        90       887        93
VIS    2025250    183200   22.9400  147.6300      10.3        92       893        95
VIS    2025250    183200   22.9500  147.6000       9.4        90       899        95
VIS    2025250    183200   22.9500  147.5700       8.9        88       908        91
VIS    2025250    183200   22.9300  147.5500       9.0        89       899        93
VIS    2025250    183200   22.9300  147.5200       9.1        88       905        94
VIS    2025250    183200   22.9400  147.5000       8.9        87       909        95
VIS    2025250    183200   22.9300  147.4900       9.3        87       912        96
VIS    2025250    183200   22.9400  146.3800       6.3       102       831        90
VIS    2025250    183200   22.9400  146.3100       6.0        97       839        91
VIS    2025250    183200   22.9300  146.1400      10.1        88       919        95
VIS    2025250    183200   22.9200  146.1100      10.1        88       950        94
VIS    2025250    183200   22.9300  146.0600      10.7        89       939        97
VIS    2025250    183200   22.9100  145.4600      12.2        87       995        95
VIS    2025250    183200   22.9100  145.4100      11.9        87       991       100
VIS    2025250    183200   22.9100  145.4000      12.0        87       991        99
VIS    2025250    183200   22.9200  145.3600      11.8        90       970        99
VIS    2025250    183200   22.9200  145.3500      11.8        91       970        99
VIS    2025250    183200   22.9000  145.3100      11.4        82       970        96
VIS    2025250    183200   22.9100  145.3000      11.0        82       972        96
VIS    2025250    183200   22.8900  143.7600       9.9        89       996        98
VIS    2025250    183200   22.8900  143.7200      10.6        91       993       100
VIS    2025250    183200   22.8900  143.7200      10.7        92       993       100
VIS    2025250    183200   22.8900  143.6900      10.5        94       993        99
VIS    2025250    183200   22.8800  142.9900      10.4        97       980        98
VIS    2025250    183200   22.8900  142.9700       9.9        94       967        99
VIS    2025250    183200   22.8900  142.9300       9.9        92       953        99
VIS    2025250    183200   22.8900  142.9200      10.1        93       935        99
VIS    2025250    183200   22.8800  142.8900      10.2        91       929        97
VIS    2025250    183200   22.9700  151.9500       6.0        96       989        97
VIS    2025250    183200   22.9700  151.9000       7.3        89       944        92
VIS    2025250    183200   22.9900  151.8700       8.3        80       872        93
VIS    2025250    183200   22.9700  151.8200       8.9        76       865        91
VIS    2025250    183200   22.9900  151.8100       9.1        77       865        92
VIS    2025250    183200   22.9700  151.6100       7.3        89       979        94
VIS    2025250    183200   22.9700  151.5900       7.5        91       973        91
VIS    2025250    183200   22.9800  151.4800       6.7        89       975        94
VIS    2025250    183200   22.9600  151.4600       6.7        92       954        95
VIS    2025250    183200   22.9700  151.4400       6.6        94       953        92
VIS    2025250    183200   22.9700  151.3800       6.5        90       946        93
VIS    2025250    183200   22.9800  151.3600       6.3        89       960        95
VIS    2025250    183200   22.9800  151.3400       6.4        88       960        93
VIS    2025250    183200   22.9600  151.3200       6.8        89       950        95
VIS    2025250    183200   22.9600  151.2000       6.9        80       968        90
VIS    2025250    183200   22.9600  151.1700       6.2        85       906        93
VIS    2025250    183200   22.9700  151.0400       5.3        94       981        90
VIS    2025250    183200   22.9500  149.6700      11.1       119       861        91
VIS    2025250    183200   22.9500  149.6400       9.6       107       884        98
VIS    2025250    183200   22.9300  149.6200       9.3       110       882        98
VIS    2025250    183200   22.9400  149.5900       8.1       107       909        98
VIS    2025250    183200   22.9300  149.5800       8.6       111       890        93
VIS    2025250    183200   22.9300  149.4800       6.5       109       876        93
VIS    2025250    183200   22.9300  149.4700       6.5       109       876        92
VIS    2025250    183200   22.9300  149.4300       7.4       108       888        97
VIS    2025250    183200   22.9500  149.4000       7.8       113       874        91
VIS    2025250    183200   22.9500  149.3600       7.9       106       883        93
VIS    2025250    183200   22.9500  149.3500       7.9       105       881        94
VIS    2025250    183200   22.9300  149.3100       7.6       110       859        92
VIS    2025250    183200   22.9400  149.2200       7.1       106       912        90
VIS    2025250    183200   22.9200  148.4700       9.3        85       977        99
VIS    2025250    183200   22.9200  148.4600       9.1        87       974        99
VIS    2025250    183200   22.9400  148.4300       8.8        88       896        95
VIS    2025250    183200   22.9200  148.3900       9.2        84       870        90
VIS    2025250    183200   22.9200  148.3700       9.3        83       879        90
VIS    2025250    183200   22.9400  148.3600       9.7        84       878        90
VIS    2025250    183200   22.9300  148.2700       9.4        91       938        99
VIS    2025250    183200   22.9100  148.2400       9.6        91       937       100
VIS    2025250    183200   22.9200  148.2400       9.6        91       937       100
VIS    2025250    183200   22.9100  148.2000       9.6        92       936        98
VIS    2025250    183200   22.9300  148.1800      10.0        97       929        96
VIS    2025250    183200   22.9300  148.1400       9.8        92       927        97
VIS    2025250    183200   22.9300  148.1300       9.7        91       925        97
VIS    2025250    183200   22.9200  148.1000       9.7        93       906        97
VIS    2025250    183200   22.9300  148.0800       9.6        91       888        95
VIS    2025250    183200   22.9100  147.8800       9.8        97       798        90
VIS    2025250    183200   22.9100  147.8200       8.8        93       829        93
VIS    2025250    183200   22.9200  147.8000       8.6        92       813        93
VIS    2025250    183200   22.9200  147.7600       9.1        94       805        90
VIS    2025250    183200   22.9100  147.7000      10.0        91       886        94
VIS    2025250    183200   22.9200  147.7000      10.1        92       886        94
VIS    2025250    183200   22.9100  147.6700       9.9        88       886        96
VIS    2025250    183200   22.9100  147.6300      10.0        86       892        95
VIS    2025250    183200   22.9000  147.6100      10.0        85       894        94
VIS    2025250    183200   22.9100  147.6000       9.9        83       894        94
VIS    2025250    183200   22.9200  147.5500       9.1        88       899        93
VIS    2025250    183200   22.9200  147.5400       9.3        89       899        95
VIS    2025250    183200   22.9100  147.5000       9.7        88       906        97
VIS    2025250    183200   22.9100  147.4800       9.8        89       915        97
VIS    2025250    183200   22.9100  147.4700       9.9        89       919        96
VIS    2025250    183200   22.8900  146.3600       6.2       102       834        94
VIS    2025250    183200   22.8900  146.1400      10.9        88       979        99
VIS    2025250    183200   22.8900  145.4900      11.6        88       990       100
VIS    2025250    183200   22.8800  145.4600      11.8        88       966        99
VIS    2025250    183200   22.8800  145.4200      11.8        87       991       100
VIS    2025250    183200   22.9000  145.4000      11.8        87       991        99
VIS    2025250    183200   22.9000  145.4000      11.8        87       989        99
VIS    2025250    183200   22.9000  145.3700      11.9        90       966        96
VIS    2025250    183200   22.8800  145.3200      11.7        89       931        98
VIS    2025250    183200   22.9000  145.3100      11.2        81       956        96
VIS    2025250    183200   22.8600  143.7700      10.7        89       990       100
VIS    2025250    183200   22.8600  143.7500      10.4        88       990       100
VIS    2025250    183200   22.8600  143.7300      10.8        89       959       100
VIS    2025250    183200   22.8600  143.7200      11.0        91       973       100
VIS    2025250    183200   22.8600  143.6700      10.3        90       987        99
VIS    2025250    183200   22.8600  143.6700      10.2        90       987       100
VIS    2025250    183200   22.8600  143.0000      11.3        98       977        97
VIS    2025250    183200   22.8600  142.9900      10.9        96       967        98
VIS    2025250    183200   22.8600  142.9500      10.1        92       948        98
VIS    2025250    183200   22.8700  142.9400       9.9        91       950        98
VIS    2025250    183200   22.8700  142.9200      10.0        89       930       100
VIS    2025250    183200   22.8800  142.8900      10.1        91       929        97
VIS    2025250    183200   22.8700  142.8700       9.8        95       926        93
VIS    2025250    183200   22.9700  151.9500       6.0        97       986        97
VIS    2025250    183200   22.9500  151.9200       6.0        94       979        91
VIS    2025250    183200   22.9600  151.8200       8.9        75       868        91
VIS    2025250    183200   22.9600  151.8100       8.9        75       865        91
VIS    2025250    183200   22.9600  151.6100       7.3        88       979        94
VIS    2025250    183200   22.9600  151.6000       7.5        92       975        93
VIS    2025250    183200   22.9400  151.5000       6.9        95       978        91
VIS    2025250    183200   22.9400  151.4900       7.0        93       973        92
VIS    2025250    183200   22.9600  151.4500       6.8        93       954        94
VIS    2025250    183200   22.9600  151.4400       6.7        93       953        90
VIS    2025250    183200   22.9600  151.4000       6.6        93       946        91
VIS    2025250    183200   22.9600  151.3800       6.6        90       955        97
VIS    2025250    183200   22.9400  151.3500       6.7        94       950        98
VIS    2025250    183200   22.9500  151.3300       6.8        92       942        98
VIS    2025250    183200   22.9300  151.2900       6.5        86       963        96
VIS    2025250    183200   22.9300  151.2900       6.5        86       986        94
VIS    2025250    183200   22.9400  151.2000       6.6        77       968        90
VIS    2025250    183200   22.9300  151.1800       6.1        80       929        95
VIS    2025250    183200   22.9300  151.0300       4.4        99       965        94
VIS    2025250    183200   22.9100  149.6600      10.9       121       863        92
VIS    2025250    183200   22.9300  149.6300      10.0       116       863        96
VIS    2025250    183200   22.9100  149.6200       9.8       115       863        96
VIS    2025250    183200   22.9300  149.5900       8.5       109       890        97
VIS    2025250    183200   22.9200  149.5100       7.8       109       877        96
VIS    2025250    183200   22.9200  149.4800       6.8       107       886        96
VIS    2025250    183200   22.9300  149.4700       6.5       107       877        93
VIS    2025250    183200   22.9300  149.4300       7.3       107       888        95
VIS    2025250    183200   22.9100  149.3500       7.4       103       881        97
VIS    2025250    183200   22.9000  149.3300       8.0       107       860        98
VIS    2025250    183200   22.9000  149.3100       7.6       106       859        95
VIS    2025250    183200   22.9100  149.2400       7.1       110       876        93
VIS    2025250    183200   22.9100  148.5300       9.9        82       994        96
VIS    2025250    183200   22.9000  148.4900       9.5        84       992        97
VIS    2025250    183200   22.8900  148.4600       9.2        86       934        97
VIS    2025250    183200   22.9000  148.4500       9.1        86       907        94
VIS    2025250    183200   22.8900  148.4100       9.1        86       870        90
VIS    2025250    183200   22.9100  148.4000       9.0        85       870        91
VIS    2025250    183200   22.9100  148.3100       9.2        82       989        92
VIS    2025250    183200   22.8900  148.2600       9.8        89       945        95
VIS    2025250    183200   22.9000  148.2300       9.7        91       938       100
VIS    2025250    183200   22.9000  148.2200       9.6        90       936       100
VIS    2025250    183200   22.8900  148.1900       9.7        94       936        98
VIS    2025250    183200   22.9100  148.1600       9.9        97       947        96
VIS    2025250    183200   22.9100  148.1500      10.0        97       957        94
VIS    2025250    183200   22.8900  148.1200      10.2        97       954        95
VIS    2025250    183200   22.9100  148.1000       9.9        95       896        95
VIS    2025250    183200   22.9100  148.0800      10.1        97       876        91
VIS    2025250    183200   22.8800  147.8700      10.3        99       834        90
VIS    2025250    183200   22.8800  147.8200       9.7        99       870        90
VIS    2025250    183200   22.8800  147.8000       9.6        97       866        92
VIS    2025250    183200   22.8900  147.7900       9.6        97       856        92
VIS    2025250    183200   22.8800  147.7600       9.2        90       856        97
VIS    2025250    183200   22.8900  147.7200       9.5        89       885        96
VIS    2025250    183200   22.8900  147.7100       9.7        90       885        96
VIS    2025250    183200   22.8900  147.6700       9.7        91       886        98
VIS    2025250    183200   22.8800  147.6500       9.5        89       887        97
VIS    2025250    183200   22.8800  147.6200       9.5        89       892        95
VIS    2025250    183200   22.9000  147.6000      10.0        84       894        93
VIS    2025250    183200   22.8900  147.5900      10.0        85       894        94
VIS    2025250    183200   22.8900  147.5600      10.1        90       896        96
VIS    2025250    183200   22.8900  147.5200      10.8        94       898        96
VIS    2025250    183200   22.8900  147.5100      11.2        93       901        95
VIS    2025250    183200   22.8900  147.4700      10.8        87       928        96
VIS    2025250    183200   22.8800  146.4500       7.6       120       833        90
VIS    2025250    183200   22.8700  146.3300       7.3        94       834        97
VIS    2025250    183200   22.8800  146.3100       8.7       102       834        93
VIS    2025250    183200   22.8700  146.2700      10.5       109       840        93
VIS    2025250    183200   22.8700  145.4600      11.8        88       966        99
VIS    2025250    183200   22.8700  145.4600      11.8        88       966        99
VIS    2025250    183200   22.8700  145.4200      11.8        88       991       100
VIS    2025250    183200   22.8500  145.4000      11.8        91       991        98
VIS    2025250    183200   22.8500  145.3800      11.8        94       957        98
VIS    2025250    183200   22.8600  145.3400      11.8        93       938        97
VIS    2025250    183200   22.8600  145.3300      11.6        92       938        96
VIS    2025250    183200   22.8400  144.0400      11.8        92       991        98
VIS    2025250    183200   22.8400  144.0300      11.6        92       984        97
VIS    2025250    183200   22.8500  143.7600      10.4        88       990        99
VIS    2025250    183200   22.8500  143.7400      10.7        89       959       100
VIS    2025250    183200   22.8600  143.7300      10.9        90       959       100
VIS    2025250    183200   22.8500  143.6800      10.6        91       981        99
VIS    2025250    183200   22.8400  143.6800      10.6        92       977        98
VIS    2025250    183200   22.8300  143.0200      11.2        96       979        97
VIS    2025250    183200   22.8400  142.9900      11.6        98       966        97
VIS    2025250    183200   22.8400  142.9800      11.5        98       950        97
VIS    2025250    183200   22.8500  142.9400      10.1        91       931        98
VIS    2025250    183200   22.8400  142.9200      10.2        88       924        99
VIS    2025250    183200   22.8500  142.9100      10.1        88       929        99
VIS    2025250    183200   22.8400  142.8900      10.0        90       930        96
VIS    2025250    183200   22.9400  151.9200       6.2        93       979        90
VIS    2025250    183200   22.9400  151.7700       8.8        68       851        90
VIS    2025250    183200   22.9200  151.7200       8.0        76       852        94
VIS    2025250    183200   22.9300  151.7000       6.8        69       853        90
VIS    2025250    183200   22.9100  151.6200       6.7        75       935        94
VIS    2025250    183200   22.9200  151.5900       7.2        89       965        96
VIS    2025250    183200   22.9100  151.5900       7.2        88       952        96
VIS    2025250    183200   22.9200  151.5400       6.5        80       967        95
VIS    2025250    183200   22.9200  151.5300       6.3        79       967        96
VIS    2025250    183200   22.9200  151.4900       6.5        88       973        91
VIS    2025250    183200   22.9300  151.4800       6.9        91       973        93
VIS    2025250    183200   22.9200  151.4100       7.4        85       980        90
VIS    2025250    183200   22.9200  151.4000       7.3        86       981        94
VIS    2025250    183200   22.9300  151.3600       6.9        94       967        97
VIS    2025250    183200   22.9300  151.3500       6.7        94       955        98
VIS    2025250    183200   22.9300  151.3200       6.7        90       940        97
VIS    2025250    183200   22.9300  151.3000       6.5        87       958        96
VIS    2025250    183200   22.9200  151.2700       6.4        86       986        92
VIS    2025250    183200   22.9200  151.2300       7.0        82       992        93
VIS    2025250    183200   22.9100  151.2000       7.0        79       929        94
VIS    2025250    183200   22.9300  151.1900       6.3        80       929        95
VIS    2025250    183200   22.9100  151.1100       4.1        92       913        91
VIS    2025250    183200   22.9100  151.0400       4.2        92       964        95
VIS    2025250    183200   22.9000  151.0300       4.1        92       936        95
VIS    2025250    183200   22.9000  151.0000       4.3        86       926        94
VIS    2025250    183200   22.8800  149.6900      10.7       117       901        91
VIS    2025250    183200   22.8900  149.6600      10.0       116       864        96
VIS    2025250    183200   22.8900  149.6300      10.0       119       863        95
VIS    2025250    183200   22.9000  149.6100       9.7       114       863        95
VIS    2025250    183200   22.9000  149.6000       9.7       115       864        94
VIS    2025250    183200   22.8800  149.5500       9.2       110       876        95
VIS    2025250    183200   22.8800  149.5200       9.5       112       865        96
VIS    2025250    183200   22.8900  149.4900       7.9       108       866        95
VIS    2025250    183200   22.8900  149.3500       7.3        96       865        95
VIS    2025250    183200   22.8800  149.3300       7.6       100       864        97
VIS    2025250    183200   22.9000  149.3200       8.0       107       860        97
VIS    2025250    183200   22.9000  149.2900       7.2       101       860        95
VIS    2025250    183200   22.8900  149.2400       6.8       110       876        92
VIS    2025250    183200   22.8900  149.2100       7.6       107       908        91
VIS    2025250    183200   22.8800  148.5200      10.2        82       994        92
VIS    2025250    183200   22.8900  148.4900       9.5        84       994        94
VIS    2025250    183200   22.8800  148.4700       9.1        85       934        96
VIS    2025250    183200   22.8600  148.4600       9.0        86       896        93
VIS    2025250    183200   22.8800  148.4300       9.3        86       876        91
VIS    2025250    183200   22.8800  148.3000       9.1        86       986        97
VIS    2025250    183200   22.8800  148.2600       9.9        88       945        95
VIS    2025250    183200   22.8800  148.2400      10.0        90       941        98
VIS    2025250    183200   22.8800  148.2300       9.9        90       941        98
VIS    2025250    183200   22.8800  148.2000       9.8        94       939        98
VIS    2025250    183200   22.8800  148.1800       9.8        95       949        98
VIS    2025250    183200   22.8800  148.1500      10.0        98       961        96
VIS    2025250    183200   22.8700  148.1100      10.4       100       896        94
VIS    2025250    183200   22.8700  147.9000       9.3        95       805        90
VIS    2025250    183200   22.8700  147.8500      10.9       103       880        90
VIS    2025250    183200   22.8700  147.8300      10.4       103       880        91
VIS    2025250    183200   22.8600  147.8200       9.9       101       880        93
VIS    2025250    183200   22.8800  147.8000       9.6        97       866        91
VIS    2025250    183200   22.8600  147.7500       9.2        89       883        97
VIS    2025250    183200   22.8600  147.7300       9.1        89       884        96
VIS    2025250    183200   22.8700  147.7200       9.1        88       884        95
VIS    2025250    183200   22.8700  147.6700       9.0        90       886        98
VIS    2025250    183200   22.8500  147.6600       8.7        90       891        96
VIS    2025250    183200   22.8600  147.6400       9.2        91       891        97
VIS    2025250    183200   22.8700  147.6200       9.4        90       892        95
VIS    2025250    183200   22.8600  147.5700      10.4        96       896        97
VIS    2025250    183200   22.8600  147.5500      10.9        96       897        96
VIS    2025250    183200   22.8700  147.5400      11.1        96       898        95
VIS    2025250    183200   22.8700  147.5100      11.5        94       902        93
VIS    2025250    183200   22.8700  147.4900      11.2        89       913        94
VIS    2025250    183200   22.8700  147.4500      10.6        84       950        96
VIS    2025250    183200   22.8500  147.4400       9.9        85       961        96
VIS    2025250    183200   22.8500  146.4500       7.1       115       832        98
VIS    2025250    183200   22.8500  146.4400       7.1       113       833        99
VIS    2025250    183200   22.8400  146.4200       6.4       104       835        95
VIS    2025250    183200   22.8400  146.3100       6.7        93       836        94
VIS    2025250    183200   22.8400  146.2700      10.0       104       848        97
VIS    2025250    183200   22.8400  145.4200      11.7        90       977        94
VIS    2025250    183200   22.8400  145.4100      11.7        91       977        98
VIS    2025250    183200   22.8300  145.3900      11.9        92       972        95
VIS    2025250    183200   22.8500  145.3600      11.7        94       939        97
VIS    2025250    183200   22.8200  144.3200      10.9        77       976        98
VIS    2025250    183200   22.8200  144.1100      11.9        92       987        97
VIS    2025250    183200   22.8200  144.0900      12.2        90       984        98
VIS    2025250    183200   22.8200  144.0600      12.1        90       974        99
VIS    2025250    183200   22.8300  144.0400      11.6        91       984        99
VIS    2025250    183200   22.8200  144.0300      11.3        91       984        98
VIS    2025250    183200   22.8100  143.9900      10.6        95       987        95
VIS    2025250    183200   22.8100  143.9600      11.9        90       987        91
VIS    2025250    183200   22.8300  143.6900      10.6        93       972        97
VIS    2025250    183200   22.8300  143.6700      10.5        92       973        98
VIS    2025250    183200   22.8100  143.0700      11.2       100       988        95
VIS    2025250    183200   22.8100  143.0400      11.1        92       988       100
VIS    2025250    183200   22.8100  143.0200      11.3        90       966       100
VIS    2025250    183200   22.8100  143.0100      11.3        91       966       100
VIS    2025250    183200   22.8100  142.9800      11.3        96       930        97
VIS    2025250    183200   22.8300  142.9500      10.4        91       924        98
VIS    2025250    183200   22.8100  142.9200      10.5        90       916        97
VIS    2025250    183200   22.8100  142.9100      10.5        91       916        97
VIS    2025250    183200   22.8100  142.8800      10.1        96       928        97
VIS    2025250    183200   22.8900  151.9300       6.9        90       943        95
VIS    2025250    183200   22.8900  151.9000       7.3        83       976        96
VIS    2025250    183200   22.9100  151.8300       8.1        68       889        91
VIS    2025250    183200   22.9100  151.7900       8.4        69       854        93
VIS    2025250    183200   22.9100  151.7700       8.3        74       852        96
VIS    2025250    183200   22.8900  151.7400       8.5        76       852        92
VIS    2025250    183200   22.9100  151.7100       8.1        71       853        90
VIS    2025250    183200   22.9000  151.6100       7.4        88       926        92
VIS    2025250    183200   22.9100  151.6000       7.3        89       949        95
VIS    2025250    183200   22.9000  151.5500       6.5        81       933        97
VIS    2025250    183200   22.9100  151.5300       6.2        78       962        96
VIS    2025250    183200   22.9100  151.5100       6.1        83       973        97
VIS    2025250    183200   22.9000  151.4700       6.5        78       979        91
VIS    2025250    183200   22.8900  151.4500       6.3        71       974        91
VIS    2025250    183200   22.9100  151.3900       7.0        85       981        94
VIS    2025250    183200   22.9100  151.3900       7.0        86       981        95
VIS    2025250    183200   22.9000  151.3500       6.7        92       964        96
VIS    2025250    183200   22.8900  151.2400       6.7        82       985        91
VIS    2025250    183200   22.8900  151.2100       7.1        81       924        95
VIS    2025250    183200   22.8900  151.2000       7.1        81       887        96
VIS    2025250    183200   22.9000  151.1800       6.4        83       878        96
VIS    2025250    183200   22.9000  151.1500       4.9        91       878        93
VIS    2025250    183200   22.9000  151.1100       4.2        94       913        94
VIS    2025250    183200   22.8800  151.0800       5.0        95       916        93
VIS    2025250    183200   22.8900  151.0700       4.9        92       935        93
VIS    2025250    183200   22.8800  151.0300       4.0        88       925        94
VIS    2025250    183200   22.9000  151.0000       4.1        85       926        94
VIS    2025250    183200   22.8600  149.9400      10.1       111       903        95
VIS    2025250    183200   22.8600  149.9200      10.3       112       899        94
VIS    2025250    183200   22.8600  149.8600      11.3       116       894        90
VIS    2025250    183200   22.8600  149.7700      10.2       113       918        90
VIS    2025250    183200   22.8700  149.7500       9.6       112       920        93
VIS    2025250    183200   22.8700  149.7300      10.2       116       897        93
VIS    2025250    183200   22.8800  149.6900      10.6       117       890        92
VIS    2025250    183200   22.8700  149.6600       9.5       112       862        97
VIS    2025250    183200   22.8600  149.6400       9.2       114       863        97
VIS    2025250    183200   22.8700  149.6100      10.8       124       863        90
VIS    2025250    183200   22.8600  149.5700      10.2       121       866        91
VIS    2025250    183200   22.8700  149.5500       9.5       113       869        90
VIS    2025250    183200   22.8500  149.5000       8.5       107       859        93
VIS    2025250    183200   22.8600  149.5000       8.5       109       859        94
VIS    2025250    183200   22.8500  149.3500       6.8        94       865        92
VIS    2025250    183200   22.8700  149.3300       7.5       100       864        97
VIS    2025250    183200   22.8700  149.3100       7.5       100       865        94
VIS    2025250    183200   22.8700  149.2900       7.2        96       869        91
VIS    2025250    183200   22.8600  149.2200       7.4       106       936        90
VIS    2025250    183200   22.8600  149.2100       7.6       105       952        91
VIS    2025250    183200   22.8500  148.5300      10.6        81       994        91
VIS    2025250    183200   22.8600  148.5000       9.4        84       994        92
VIS    2025250    183200   22.8600  148.4700       9.0        85       954        96
VIS    2025250    183200   22.8400  148.3300       9.0        90       988        96
VIS    2025250    183200   22.8400  148.3000       9.2        88       988        97
VIS    2025250    183200   22.8400  148.2600       9.8        88       950        98
VIS    2025250    183200   22.8400  148.2400       9.9        90       950        97
VIS    2025250    183200   22.8600  148.2100      10.1        94       932        97
VIS    2025250    183200   22.8400  148.1900      10.5        96       949        95
VIS    2025250    183200   22.8300  148.1600      10.3        97       949        97
VIS    2025250    183200   22.8400  148.1200      10.2        99       896        95
VIS    2025250    183200   22.8500  148.1200      10.4        99       896        94
VIS    2025250    183200   22.8300  147.8900      10.3        99       805        90
VIS    2025250    183200   22.8400  147.8700      10.9       101       884        91
VIS    2025250    183200   22.8500  147.7400       9.2        90       884        96
VIS    2025250    183200   22.8500  147.7300       9.2        90       884        95
VIS    2025250    183200   22.8300  147.7000       8.7        89       890        95
VIS    2025250    183200   22.8500  147.6600       8.5        89       891        96
VIS    2025250    183200   22.8500  147.6600       8.6        89       892        96
VIS    2025250    183200   22.8400  147.6200       9.5        95       894        98
VIS    2025250    183200   22.8400  147.5900       9.8        97       896        98
VIS    2025250    183200   22.8500  147.5700      10.1        96       897        98
VIS    2025250    183200   22.8500  147.5600      10.2        95       898        98
VIS    2025250    183200   22.8300  147.5200       8.9        90       909        95
VIS    2025250    183200   22.8400  147.4400       9.0        88       961        95
VIS    2025250    183200   22.8100  146.2900       7.2       106       841        91
VIS    2025250    183200   22.8200  146.2900       7.3       102       841        90
VIS    2025250    183200   22.8100  144.3500      10.2        69       976        91
VIS    2025250    183200   22.7900  144.3300      11.2        77       976        98
VIS    2025250    183200   22.8000  144.3200      10.9        78       976        98
VIS    2025250    183200   22.7900  144.2900      11.4        85       975        99
VIS    2025250    183200   22.8000  144.2300       9.1        85       993        91
VIS    2025250    183200   22.7900  144.1700      11.6        90       980        99
VIS    2025250    183200   22.7900  144.1600      11.7        91       980        99
VIS    2025250    183200   22.8100  144.1000      12.3        90       984        99
VIS    2025250    183200   22.8000  144.0200      10.9        94       984        94
VIS    2025250    183200   22.7900  143.1100      11.4        98       995        98
VIS    2025250    183200   22.7800  143.0900      11.2       100       995        97
VIS    2025250    183200   22.7900  143.0700      11.3        97       966        96
VIS    2025250    183200   22.8000  143.0300      11.3        88       964       100
VIS    2025250    183200   22.8000  143.0100      11.3        91       964        99
VIS    2025250    183200   22.7900  143.0000      11.3        90       925        99
VIS    2025250    183200   22.7900  142.9600      10.6        89       917        99
VIS    2025250    183200   22.7900  142.9300      10.7        88       915        99
VIS    2025250    183200   22.8000  142.9200      10.6        90       916        98
VIS    2025250    183200   22.8000  142.8900      10.3        94       919        97
VIS    2025250    183200   22.7800  142.5300       9.6        87       985        98
VIS    2025250    183200   22.7800  142.5300       9.5        87       992        98
VIS    2025250    183200   22.7800  142.4800       9.6        89       985       100
VIS    2025250    183200   22.7800  142.4800       9.7        90       979       100
VIS    2025250    183200   22.7800  142.4500      10.0        89       998       100
VIS    2025250    183200   22.8800  151.9200       7.0        90       943        96
VIS    2025250    183200   22.8700  151.8900       6.6        86       940        99
VIS    2025250    183200   22.8700  151.8700       6.4        78       933        98
VIS    2025250    183200   22.8800  151.8400       7.5        69       889        93
VIS    2025250    183200   22.8800  151.8100       8.5        75       854        95
VIS    2025250    183200   22.8700  151.7900       9.0        75       854        90
VIS    2025250    183200   22.8700  151.7500       8.6        72       854        90
VIS    2025250    183200   22.8800  151.7300       8.5        73       853        91
VIS    2025250    183200   22.8600  151.6300       7.0        82       922        94
VIS    2025250    183200   22.8800  151.6000       7.4        88       922        92
VIS    2025250    183200   22.8800  151.5800       7.1        86       925        94
VIS    2025250    183200   22.8800  151.5500       6.5        79       913        93
VIS    2025250    183200   22.8800  151.5400       6.4        78       909        91
VIS    2025250    183200   22.8700  151.4200       6.5        70       972        92
VIS    2025250    183200   22.8800  151.2200       7.0        82       924        93
VIS    2025250    183200   22.8700  151.2000       6.9        83       878        97
VIS    2025250    183200   22.8800  151.1500       5.5        84       881        94
VIS    2025250    183200   22.8600  151.1400       4.6        82       904        94
VIS    2025250    183200   22.8700  151.1000       4.8        96       920        96
VIS    2025250    183200   22.8700  151.0900       4.7        97       920        94
VIS    2025250    183200   22.8500  149.9300      10.1       111       903        95
VIS    2025250    183200   22.8500  149.9300      10.1       111       903        94
VIS    2025250    183200   22.8300  149.8500      11.6       116       888        91
VIS    2025250    183200   22.8400  149.7800      10.9       113       902        93
VIS    2025250    183200   22.8500  149.7600      10.0       112       906        94
VIS    2025250    183200   22.8500  149.7400      10.1       113       897        92
VIS    2025250    183200   22.8500  149.6700       9.6       113       861        94
VIS    2025250    183200   22.8500  149.6300       9.2       114       863        97
VIS    2025250    183200   22.8500  149.5700       9.7       120       869        93
VIS    2025250    183200   22.8400  149.5300       8.9       112       865        97
VIS    2025250    183200   22.8400  149.5200       8.6       109       865        96
VIS    2025250    183200   22.8500  149.3500       6.8        97       865        93
VIS    2025250    183200   22.8400  149.3200       6.9        98       866        95
VIS    2025250    183200   22.8500  149.2900       7.1        96       883        94
VIS    2025250    183200   22.8400  149.2200       7.6       103       938        90
VIS    2025250    183200   22.8300  148.4900       9.2        82       963        97
VIS    2025250    183200   22.8100  148.4700       9.0        84       962        98
VIS    2025250    183200   22.8200  148.3400       9.0        87       988        99
VIS    2025250    183200   22.8200  148.3100       9.0        87       988        99
VIS    2025250    183200   22.8300  148.2400       9.9        90       950        97
VIS    2025250    183200   22.8300  148.2300      10.0        93       950        96
VIS    2025250    183200   22.8300  148.2000      10.6        97       929        94
VIS    2025250    183200   22.8200  148.1300      10.1        98       829        92
VIS    2025250    183200   22.8200  148.1200      10.0        97       799        90
VIS    2025250    183200   22.8200  147.7400       9.3        92       887        95
VIS    2025250    183200   22.8000  147.7000       8.7        90       894        92
VIS    2025250    183200   22.8200  147.6700       8.1        86       894        90
VIS    2025250    183200   22.8100  147.6400       8.6        92       895        94
VIS    2025250    183200   22.8000  147.6300       8.8        94       896        95
VIS    2025250    183200   22.8100  147.6100       9.4        97       896        97
VIS    2025250    183200   22.8200  147.4600       8.5        89       961        95
VIS    2025250    183200   22.8200  147.4300       8.5        86       961        95
VIS    2025250    183200   22.7800  144.2800      11.2        86       972        99
VIS    2025250    183200   22.7800  144.2300      10.0        80       984        97
VIS    2025250    183200   22.7800  144.2300      10.4        82       984        97
VIS    2025250    183200   22.7800  144.2000      12.3        91       983        98
VIS    2025250    183200   22.7900  144.1600      11.9        91       980        99
VIS    2025250    183200   22.7700  144.1400      11.7        92       977        97
VIS    2025250    183200   22.7600  143.1600      11.2        88       992       100
VIS    2025250    183200   22.7600  143.1500      11.1        87       985       100
VIS    2025250    183200   22.7600  143.1300      11.1        88       985        98
VIS    2025250    183200   22.7600  143.0900      11.2        97       966        97
VIS    2025250    183200   22.7700  143.0800      11.2        97       966        97
VIS    2025250    183200   22.7600  143.0500      11.2        92       927        98
VIS    2025250    183200   22.7800  143.0100      11.5        89       922        97
VIS    2025250    183200   22.7800  143.0000      11.4        88       917        98
VIS    2025250    183200   22.7600  142.9800      11.1        89       917        94
VIS    2025250    183200   22.7700  142.9400      10.6        88       917        98
VIS    2025250    183200   22.7700  142.9300      10.7        88       917        99
VIS    2025250    183200   22.7500  142.8600      10.4        98       979        94
VIS    2025250    183200   22.7500  142.5100      10.0        92       985        99
VIS    2025250    183200   22.7600  142.4900      10.0        92       979        99
VIS    2025250    183200   22.7500  142.4600      10.7        94       967        99
VIS    2025250    183200   22.7500  142.4500      10.6        92       967        99
VIS    2025250    183200   22.8600  151.9300       6.8        85       943        90
VIS    2025250    183200   22.8600  151.9300       6.8        86       943        92
VIS    2025250    183200   22.8600  151.8900       6.5        86       940        99
VIS    2025250    183200   22.8500  151.8700       5.9        77       895        99
VIS    2025250    183200   22.8500  151.8300       7.3        71       856        98
VIS    2025250    183200   22.8600  151.8100       8.6        74       855        92
VIS    2025250    183200   22.8400  151.7700       8.9        68       857        92
VIS    2025250    183200   22.8500  151.7700       8.9        70       854        93
VIS    2025250    183200   22.8600  151.7500       8.7        71       857        94
VIS    2025250    183200   22.8600  151.6500       7.6        79       922        90
VIS    2025250    183200   22.8600  151.6000       7.2        84       922        92
VIS    2025250    183200   22.8500  151.5700       7.0        80       907        90
VIS    2025250    183200   22.8600  151.5600       7.1        82       907        91
VIS    2025250    183200   22.8300  151.4100       7.5        81       956        93
VIS    2025250    183200   22.8400  151.2900       7.3        82       983        91
VIS    2025250    183200   22.8300  151.2300       7.4        79       892        92
VIS    2025250    183200   22.8500  151.2100       6.7        83       853        95
VIS    2025250    183200   22.8500  151.1900       6.0        86       853        94
VIS    2025250    183200   22.8300  151.1700       4.3        81       859        91
VIS    2025250    183200   22.8200  149.8700      11.2       115       881        91
VIS    2025250    183200   22.8100  149.8700      11.3       115       882        91
VIS    2025250    183200   22.8200  149.6400       9.2       111       861        94
VIS    2025250    183200   22.8000  149.6300       9.7       112       861        96
VIS    2025250    183200   22.8100  149.6100       9.6       115       862        96
VIS    2025250    183200   22.8100  149.5600       8.0       110       866        96
VIS    2025250    183200   22.8200  149.5500       8.1       111       869        98
VIS    2025250    183200   22.8200  149.4200       7.1       116       890        91
VIS    2025250    183200   22.8100  149.3800       7.7       116       866        92
VIS    2025250    183200   22.8000  149.3700       7.5       113       867        96
VIS    2025250    183200   22.8000  149.3400       7.2       108       867        97
VIS    2025250    183200   22.8000  149.3100       7.3       102       896        97
VIS    2025250    183200   22.7900  148.4800       8.7        83       904        95
VIS    2025250    183200   22.7900  148.4600       8.9        84       901        94
VIS    2025250    183200   22.8000  148.3500       8.8        87       988        97
VIS    2025250    183200   22.8000  148.2200       9.9        92       970        97
VIS    2025250    183200   22.7800  148.2000      10.4        96       955        98
VIS    2025250    183200   22.8000  148.1900      10.7        97       929        95
VIS    2025250    183200   22.7900  147.9400       9.4        96       793        90
VIS    2025250    183200   22.7800  147.9300       9.8       100       793        91
VIS    2025250    183200   22.7800  147.7400       8.7        88       891        96
VIS    2025250    183200   22.7800  147.7300       8.6        88       891        95
VIS    2025250    183200   22.8000  147.7100       8.7        90       894        93
VIS    2025250    183200   22.7900  147.6700       8.5        86       894        90
VIS    2025250    183200   22.8000  147.6600       8.5        89       895        91
VIS    2025250    183200   22.8000  147.6300       8.8        94       900        94
VIS    2025250    183200   22.7800  147.6000       8.4        90       912        92
VIS    2025250    183200   22.8000  147.4900       8.7        93       937        91
VIS    2025250    183200   22.7700  147.4600       8.7        88       966        95
VIS    2025250    183200   22.7800  147.4300       9.2        81       944        95
VIS    2025250    183200   22.7400  144.2600      11.5        83       972       100
VIS    2025250    183200   22.7600  144.2300      10.8        83       984        99
VIS    2025250    183200   22.7400  144.2200      12.3        90       988        99
VIS    2025250    183200   22.7600  144.1900      12.2        93       980        98
VIS    2025250    183200   22.7500  144.1500      12.1        93       960        98
VIS    2025250    183200   22.7600  144.1500      11.8        93       977        98
VIS    2025250    183200   22.7400  144.1100      11.6        89       970        98
VIS    2025250    183200   22.7600  144.0900      11.6        89       978        90
VIS    2025250    183200   22.7600  144.0600      11.9        89       976        91
VIS    2025250    183200   22.7300  143.1900      11.8        90       960        98
VIS    2025250    183200   22.7400  143.1600      11.1        86       965       100
VIS    2025250    183200   22.7300  143.1600      11.1        86       946       100
VIS    2025250    183200   22.7300  143.1200      11.1        89       968       100
VIS    2025250    183200   22.7300  143.0900      11.3        93       963        97
VIS    2025250    183200   22.7400  143.0700      11.5        91       954        93
VIS    2025250    183200   22.7400  143.0600      11.6        89       954        93
VIS    2025250    183200   22.7300  143.0300      11.4        88       926        95
VIS    2025250    183200   22.7400  142.9900      11.4        92       921        95
VIS    2025250    183200   22.7500  142.9800      11.0        89       917        95
VIS    2025250    183200   22.7300  142.5700      10.3        90       995       100
VIS    2025250    183200   22.7300  142.5600      10.3        90       995        99
VIS    2025250    183200   22.7400  142.5300       9.9        91       992        99
VIS    2025250    183200   22.7300  142.5100      10.4        95       979        98
VIS    2025250    183200   22.7400  142.4900      10.3        96       967        98
VIS    2025250    183200   22.7300  142.4400      10.8        93       950        99
VIS    2025250    183200   22.8300  151.8700       6.1        73       893        95
VIS    2025250    183200   22.8200  151.8300       7.1        70       856        95
VIS    2025250    183200   22.8200  151.8000       8.4        68       855        93
VIS    2025250    183200   22.8200  151.7700       8.9        67       858        91
VIS    2025250    183200   22.8300  151.7700       8.9        67       858        90
VIS    2025250    183200   22.8200  151.5600       6.4        68       880        90
VIS    2025250    183200   22.8300  151.5500       6.5        70       860        90
VIS    2025250    183200   22.8100  151.4200       7.6        83       956        91
VIS    2025250    183200   22.8000  151.2500       7.6        76       961        90
VIS    2025250    183200   22.8200  151.2300       7.4        77       912        90
VIS    2025250    183200   22.8100  151.2200       7.0        80       892        93
VIS    2025250    183200   22.8200  151.1700       4.5        84       859        92
VIS    2025250    183200   22.7800  149.7900      10.4       113       877        90
VIS    2025250    183200   22.7900  149.7000      10.7       112       869        90
VIS    2025250    183200   22.7900  149.6900      10.2       112       869        90
VIS    2025250    183200   22.7800  149.6500       9.9       108       864        98
VIS    2025250    183200   22.8000  149.6300       9.8       112       861        96
VIS    2025250    183200   22.7800  149.6100       9.6       112       857        96
VIS    2025250    183200   22.7800  149.5700       7.7       102       855        97
VIS    2025250    183200   22.7900  149.5500       7.4        99       869        97
VIS    2025250    183200   22.8000  149.4000       6.7       114       890        90
VIS    2025250    183200   22.7800  149.3600       7.5       108       877        97
VIS    2025250    183200   22.7800  149.3300       7.5       106       880        98
VIS    2025250    183200   22.7800  149.3000       7.4       104       921        98
VIS    2025250    183200   22.7700  148.5500       9.7        84       994        97
VIS    2025250    183200   22.7600  148.5200       9.0        85       970        98
VIS    2025250    183200   22.7800  148.4900       8.5        82       904        96
VIS    2025250    183200   22.7700  148.3200       9.2        85       984        97
VIS    2025250    183200   22.7700  148.3000       9.3        85       982        96
VIS    2025250    183200   22.7600  148.2600       9.7        97       984        99
VIS    2025250    183200   22.7600  148.2300       9.7        96       979        99
VIS    2025250    183200   22.7700  148.2100      10.2        96       939        99
VIS    2025250    183200   22.7700  148.1900      10.4        95       876        96
VIS    2025250    183200   22.7700  147.9500       9.9        99       791        90
VIS    2025250    183200   22.7600  147.8400       8.7        97       793        92
VIS    2025250    183200   22.7600  147.8000       8.7        95       792        91
VIS    2025250    183200   22.7500  147.7800       8.2        91       795        90
VIS    2025250    183200   22.7700  147.7500       8.5        88       802        90
VIS    2025250    183200   22.7700  147.7400       8.6        87       891        96
VIS    2025250    183200   22.7600  147.7200       8.2        87       894        94
VIS    2025250    183200   22.7600  147.6900       8.2        85       894        91
VIS    2025250    183200   22.7700  147.6300       8.4        87       904        90
VIS    2025250    183200   22.7600  147.6100       7.8        88       912        90
VIS    2025250    183200   22.7500  147.4900       8.4        87       975        95
VIS    2025250    183200   22.7500  147.4800       8.2        87       975        93
VIS    2025250    183200   22.7500  147.4400       8.5        87       945        97
VIS    2025250    183200   22.7400  146.9200       6.1        84       911        91
VIS    2025250    183200   22.7400  146.4700       9.4       132       724        90
VIS    2025250    183200   22.7200  144.4500      10.8        84       996        99
VIS    2025250    183200   22.7200  144.4000      10.6        89       986        99
VIS    2025250    183200   22.7300  144.2600      11.6        82       972       100
VIS    2025250    183200   22.7300  144.2600      11.6        83       972       100
VIS    2025250    183200   22.7300  144.2200      12.3        90       988        99
VIS    2025250    183200   22.7100  144.1900      12.1        93       993        99
VIS    2025250    183200   22.7200  144.1700      12.3        93       956        99
VIS    2025250    183200   22.7300  144.1500      12.4        93       954        99
VIS    2025250    183200   22.7200  144.0400      12.3        91       980        99
VIS    2025250    183200   22.7100  143.2100      12.1        88       964        98
VIS    2025250    183200   22.7300  143.2000      11.9        89       960        98
VIS    2025250    183200   22.7100  143.1700      11.9        87       924        98
VIS    2025250    183200   22.7200  143.1400      11.1        86       933       100
VIS    2025250    183200   22.7000  143.1100      10.9        91       928        98
VIS    2025250    183200   22.7200  143.1100      11.0        91       933        99
VIS    2025250    183200   22.7200  143.0400      11.2        85       949        93
VIS    2025250    183200   22.7200  143.0300      11.0        86       949        97
VIS    2025250    183200   22.7000  143.0000      10.7        92       949        96
VIS    2025250    183200   22.7200  142.9700      10.9        91       927        94
VIS    2025250    183200   22.7100  142.6900      11.0        83       978        99
VIS    2025250    183200   22.7100  142.6600      12.5        82       958        97
VIS    2025250    183200   22.7000  142.6500      13.5        82       982        94
VIS    2025250    183200   22.7100  142.5800      10.4        86       995       100
VIS    2025250    183200   22.7000  142.5800      10.4        87       995       100
VIS    2025250    183200   22.7000  142.5400      10.7        88       972       100
VIS    2025250    183200   22.7000  142.5200      10.7        89       972       100
VIS    2025250    183200   22.7000  142.4900      10.6        92       960        99
VIS    2025250    183200   22.7100  142.4600      10.7        91       950        98
VIS    2025250    183200   22.7200  142.4500      10.8        93       950        98
VIS    2025250    183200   22.8100  151.8400       7.1        69       858        95
VIS    2025250    183200   22.7900  151.7900       7.9        66       860        91
VIS    2025250    183200   22.8000  151.7900       8.1        66       860        91
VIS    2025250    183200   22.7900  151.6900       7.6        76       935        90
VIS    2025250    183200   22.8100  151.6700       6.9        76       935        90
VIS    2025250    183200   22.8000  151.6000       7.3        75       960        91
VIS    2025250    183200   22.7800  151.5700       6.7        65       901        90
VIS    2025250    183200   22.7800  151.5200       6.9        71       854        90
VIS    2025250    183200   22.7800  151.4200       7.4        88       962        95
VIS    2025250    183200   22.8000  151.4000       8.1        87       967        92
VIS    2025250    183200   22.7900  151.3900       7.9        87       967        93
VIS    2025250    183200   22.7900  151.2900       7.4        77       994        91
VIS    2025250    183200   22.7800  151.2800       7.7        79       982        91
VIS    2025250    183200   22.7900  151.2400       7.8        78       924        91
VIS    2025250    183200   22.7900  151.2200       7.3        82       907        95
VIS    2025250    183200   22.7900  151.1900       6.5        82       867        96
VIS    2025250    183200   22.7900  151.1900       6.3        81       867        95
VIS    2025250    183200   22.7600  149.8400       9.6       110       888        98
VIS    2025250    183200   22.7700  149.8300       9.9       111       880        97
VIS    2025250    183200   22.7800  149.7900      10.3       112       865        92
VIS    2025250    183200   22.7800  149.7800      10.3       111       866        92
VIS    2025250    183200   22.7500  149.7100      10.6       115       863        91
VIS    2025250    183200   22.7500  149.7000       9.9       112       863        93
VIS    2025250    183200   22.7500  149.6600       9.0       105       864       100
VIS    2025250    183200   22.7700  149.6500       9.5       107       864        99
VIS    2025250    183200   22.7500  149.6100       8.9       108       855        99
VIS    2025250    183200   22.7600  149.6000       8.5       107       853        97
VIS    2025250    183200   22.7700  149.5700       7.7       102       855        96
VIS    2025250    183200   22.7600  149.5400       7.7        95       865        94
VIS    2025250    183200   22.7700  149.5200       7.7        95       898        91
VIS    2025250    183200   22.7500  149.4600       7.4        89       979        93
VIS    2025250    183200   22.7600  149.3500       7.6       106       881        96
VIS    2025250    183200   22.7500  149.3200       7.0       103       938        97
VIS    2025250    183200   22.7600  149.3000       7.2       104       931        97
VIS    2025250    183200   22.7600  149.2900       7.3       103       931        98
VIS    2025250    183200   22.7400  148.5400       9.0        83       975        99
VIS    2025250    183200   22.7400  148.5200       9.0        84       943        99
VIS    2025250    183200   22.7600  148.4900       8.6        84       904        94
VIS    2025250    183200   22.7400  148.3500       9.1        87       988        95
VIS    2025250    183200   22.7500  148.3200       9.6        88       984        97
VIS    2025250    183200   22.7300  148.2700      10.7        99       976        96
VIS    2025250    183200   22.7300  148.2500      10.3       101       927        95
VIS    2025250    183200   22.7300  148.2400      10.1       100       913        95
VIS    2025250    183200   22.7500  148.2000      10.3        99       876        95
VIS    2025250    183200   22.7400  148.1900      10.4       100       795        90
VIS    2025250    183200   22.7300  148.0800      10.1       100       792        92
VIS    2025250    183200   22.7300  148.0500      10.0        96       798        91
VIS    2025250    183200   22.7400  148.0400       9.9        95       801        91
VIS    2025250    183200   22.7400  147.9900      10.0        94       802        91
VIS    2025250    183200   22.7300  147.9900      10.1        95       802        91
VIS    2025250    183200   22.7300  147.8900       8.7        92       796        92
VIS    2025250    183200   22.7400  147.8500       8.5        94       799        93
VIS    2025250    183200   22.7500  147.8300       8.5        96       792        92
VIS    2025250    183200   22.7400  147.8100       8.2        94       793        95
VIS    2025250    183200   22.7500  147.7700       8.0        90       800        91
VIS    2025250    183200   22.7300  147.7600       7.6        83       814        93
VIS    2025250    183200   22.7300  147.6100       7.7        87       911        91
VIS    2025250    183200   22.7200  147.5900       7.8        87       919        95
VIS    2025250    183200   22.7200  147.5600       8.4        85       953        93
VIS    2025250    183200   22.7300  147.5400       8.4        86       976        94
VIS    2025250    183200   22.7200  147.5100       8.1        84       975        96
VIS    2025250    183200   22.7400  147.4800       8.3        87       975        96
VIS    2025250    183200   22.7400  147.4800       8.2        87       975        95
VIS    2025250    183200   22.7200  147.4400       8.5        93       954        95
VIS    2025250    183200   22.7400  146.9700       7.1        76       992        91
VIS    2025250    183200   22.7300  146.8700       5.3       102       810        92
VIS    2025250    183200   22.7100  146.3200      10.2       129       740        91
VIS    2025250    183200   22.6900  144.4600      11.6        86       996        99
VIS    2025250    183200   22.6900  144.4600      11.6        86       996       100
VIS    2025250    183200   22.6900  144.4100      11.2        87       975        97
VIS    2025250    183200   22.7000  144.4100      11.1        87       975        97
VIS    2025250    183200   22.7000  144.2000      11.9        91       993        99
VIS    2025250    183200   22.7100  144.1900      12.0        92       993        98
VIS    2025250    183200   22.7000  144.1700      12.1        92       956        99
VIS    2025250    183200   22.7000  144.0600      12.0        92       979        98
VIS    2025250    183200   22.7000  143.2100      12.0        87       968        96
VIS    2025250    183200   22.6900  143.1800      12.3        88       926        96
VIS    2025250    183200   22.7000  143.1500      11.7        85       920        98
VIS    2025250    183200   22.6900  143.1400      11.5        85       920        96
VIS    2025250    183200   22.7000  143.1000      10.7        91       928        97
VIS    2025250    183200   22.6800  143.0700      10.3        89       922        94
VIS    2025250    183200   22.6800  143.0600      10.3        86       922        95
VIS    2025250    183200   22.6800  143.0300      10.2        81       952        95
VIS    2025250    183200   22.6800  143.0100       9.9        84       952        95
VIS    2025250    183200   22.7000  142.9700      11.0        91       933        95
VIS    2025250    183200   22.7000  142.9600      11.2        89       949        96
VIS    2025250    183200   22.6800  142.7400       9.6        82       982        98
VIS    2025250    183200   22.6800  142.7400       9.8        82       957        98
VIS    2025250    183200   22.7000  142.7100      10.2        82       958        97
VIS    2025250    183200   22.6900  142.6900      11.6        86       955        98
VIS    2025250    183200   22.7000  142.6600      13.1        83       958        96
VIS    2025250    183200   22.6900  142.6100      11.1        85      1000        99
VIS    2025250    183200   22.6800  142.5800      10.6        87       995        99
VIS    2025250    183200   22.6800  142.5500      10.4        89       972        99
VIS    2025250    183200   22.6900  142.5300      10.8        88       970        99
VIS    2025250    183200   22.6700  142.5100      10.4        89       968        98
VIS    2025250    183200   22.6800  142.4700      10.6        90       957        99
VIS    2025250    183200   22.6800  142.4600      10.6        89       957        99
VIS    2025250    183200   22.7700  151.6800       6.9        75       945        92
VIS    2025250    183200   22.7600  151.6800       6.9        75       949        92
VIS    2025250    183200   22.7700  151.6500       7.3        83       960        92
VIS    2025250    183200   22.7800  151.5100       7.3        75       854        93
VIS    2025250    183200   22.7800  151.4900       7.4        74       872        90
VIS    2025250    183200   22.7700  151.4700       7.3        74       882        90
VIS    2025250    183200   22.7600  151.4300       6.7        85       961        93
VIS    2025250    183200   22.7600  151.4200       6.8        87       962        95
VIS    2025250    183200   22.7600  151.3900       7.5        87       962        93
VIS    2025250    183200   22.7600  151.3100       8.2        85       992        92
VIS    2025250    183200   22.7600  151.2600       7.9        77       961        91
VIS    2025250    183200   22.7600  151.2400       7.8        78       924        92
VIS    2025250    183200   22.7500  151.2100       7.7        79       904        94
VIS    2025250    183200   22.7500  151.1900       7.3        80       872        94
VIS    2025250    183200   22.7600  151.1800       6.8        81       867        94
VIS    2025250    183200   22.7300  149.8500       9.2       114       906        96
VIS    2025250    183200   22.7500  149.8300       9.4       110       891        98
VIS    2025250    183200   22.7300  149.8100       9.5       113       864        98
VIS    2025250    183200   22.7500  149.7900      10.2       113       864        95
VIS    2025250    183200   22.7300  149.7500      10.7       119       863        94
VIS    2025250    183200   22.7300  149.7300      10.8       114       830        92
VIS    2025250    183200   22.7500  149.7000       9.9       113       861        94
VIS    2025250    183200   22.7500  149.6100       8.6       107       853        98
VIS    2025250    183200   22.7400  149.5600       7.6       100       853        91
VIS    2025250    183200   22.7300  149.5100       7.4       101       889        94
VIS    2025250    183200   22.7500  149.5000       7.6        93       919        97
VIS    2025250    183200   22.7300  149.4700       7.2        90       973        90
VIS    2025250    183200   22.7400  149.3300       7.1       103       939        95
VIS    2025250    183200   22.7400  149.3100       6.9       103       938        91
VIS    2025250    183200   22.7400  149.2900       7.4       101       942        90
VIS    2025250    183200   22.7200  148.5600       8.8        81       994        98
VIS    2025250    183200   22.7200  148.5500       8.9        82       953        98
VIS    2025250    183200   22.7300  148.5100       9.0        84       925        98
VIS    2025250    183200   22.7300  148.3200      11.4        96       984        92
VIS    2025250    183200   22.7200  148.2700      10.9       101       927        95
VIS    2025250    183200   22.7300  148.2600      10.6       101       927        95
VIS    2025250    183200   22.7100  148.2300      10.2        96       796        91
VIS    2025250    183200   22.7300  148.2000      10.4       101       795        91
VIS    2025250    183200   22.7300  148.1800      10.1        99       789        90
VIS    2025250    183200   22.7100  148.1300       8.3        96       791        92
VIS    2025250    183200   22.7100  148.1200       8.0        96       792        94
VIS    2025250    183200   22.7100  148.1000       8.6        98       792        95
VIS    2025250    183200   22.7000  148.0700       9.5        97       799        92
VIS    2025250    183200   22.7100  148.0400       9.7        94       839        94
VIS    2025250    183200   22.7200  148.0100      10.0        94       822        93
VIS    2025250    183200   22.7200  147.9800      10.1        96       802        91
VIS    2025250    183200   22.7200  147.8800       8.5        91       796        93
VIS    2025250    183200   22.7000  147.8600       8.5        88       801        92
VIS    2025250    183200   22.7000  147.8400       8.3        88       819        95
VIS    2025250    183200   22.7000  147.8100       7.9        87       819        95
VIS    2025250    183200   22.7000  147.8000       7.8        86       822        95
VIS    2025250    183200   22.7200  147.7600       7.6        83       814        92
VIS    2025250    183200   22.7200  147.7500       7.7        82       826        92
VIS    2025250    183200   22.7000  147.6000       7.9        85       909        92
VIS    2025250    183200   22.7100  147.5800       8.0        86       915        94
VIS    2025250    183200   22.7200  147.5700       8.2        85       936        94
VIS    2025250    183200   22.7000  147.5300       8.8        83       964        96
VIS    2025250    183200   22.7100  147.5100       8.4        83       966        96
VIS    2025250    183200   22.7200  147.4900       8.2        86       964        95
VIS    2025250    183200   22.7000  147.4500       8.4        90       954        97
VIS    2025250    183200   22.7200  147.4200       8.8        94       954        96
VIS    2025250    183200   22.7100  147.3900       9.0        93       943        98
VIS    2025250    183200   22.7000  147.3900       9.1        93       943        97
VIS    2025250    183200   22.7000  146.8400       6.5       108       848        97
VIS    2025250    183200   22.6900  146.8000       7.4        99       966        90
VIS    2025250    183200   22.6800  146.3200      10.3       128       778        93
VIS    2025250    183200   22.6800  144.4600      11.7        87       996        99
VIS    2025250    183200   22.6700  144.3700      12.2        89       981        92
VIS    2025250    183200   22.6600  143.2100      11.9        89       993        90
VIS    2025250    183200   22.6600  143.2000      12.2        90       977        94
VIS    2025250    183200   22.6700  143.1700      12.5        87       931        93
VIS    2025250    183200   22.6600  143.1400      11.4        84       923        92
VIS    2025250    183200   22.6700  143.1100      10.6        88       922        94
VIS    2025250    183200   22.6700  143.1000      10.1        90       922        93
VIS    2025250    183200   22.6700  143.0600      10.2        87       920        97
VIS    2025250    183200   22.6700  143.0500      10.2        85       920        98
VIS    2025250    183200   22.6700  143.0200       9.9        82       952        96
VIS    2025250    183200   22.6700  143.0000       9.9        84       952        94
VIS    2025250    183200   22.6500  142.7600      10.7        87       982        99
VIS    2025250    183200   22.6700  142.7400      10.1        82       950        99
VIS    2025250    183200   22.6500  142.7200      11.1        84       925       100
VIS    2025250    183200   22.6600  142.7100      11.1        83       927       100
VIS    2025250    183200   22.6600  142.6700      11.7        85       931       100
VIS    2025250    183200   22.6700  142.6600      12.3        86       956        99
VIS    2025250    183200   22.6500  142.6300      11.8        88       980        99
VIS    2025250    183200   22.6600  142.6000      11.1        88       995        99
VIS    2025250    183200   22.6700  142.5800      10.4        88       995       100
VIS    2025250    183200   22.6600  142.5400      10.3        89       972        99
VIS    2025250    183200   22.6600  142.5100      10.4        89       969        98
VIS    2025250    183200   22.6700  142.5000      10.4        88       968        98
VIS    2025250    183200   22.6700  142.4600      10.6        89       967        98
VIS    2025250    183200   22.6600  142.4400      10.5        88       948        98
VIS    2025250    183200   22.7500  151.5400       6.6        67       852        90
VIS    2025250    183200   22.7500  151.5000       7.3        73       855        93
VIS    2025250    183200   22.7500  151.4900       7.4        71       872        90
VIS    2025250    183200   22.7500  151.3900       7.5        86       961        92
VIS    2025250    183200   22.7400  151.0900       4.4        95       964        95
VIS    2025250    183200   22.7100  149.8600      10.3       116       907        93
VIS    2025250    183200   22.7200  149.8300       9.2       114       903        96
VIS    2025250    183200   22.7100  149.7900       9.6       114       864        96
VIS    2025250    183200   22.7000  149.7600       9.1       114       865        98
VIS    2025250    183200   22.7100  149.7400       9.8       114       864        93
VIS    2025250    183200   22.7100  149.5100       7.5       107       856        96
VIS    2025250    183200   22.7200  149.4800       7.3        95       925        97
VIS    2025250    183200   22.7100  149.4500       7.3        97       925        95
VIS    2025250    183200   22.7100  148.5500       9.0        80       953        96
VIS    2025250    183200   22.7000  148.5400       9.1        81       933        96
VIS    2025250    183200   22.6900  148.3100      12.4        95       935        90
VIS    2025250    183200   22.6900  148.3000      12.2        95       925        90
VIS    2025250    183200   22.7000  148.2700      10.9        96       899        93
VIS    2025250    183200   22.6900  148.1300       8.1        93       791        93
VIS    2025250    183200   22.7000  148.1200       7.9        95       793        93
VIS    2025250    183200   22.7000  148.0800       9.1        96       798        93
VIS    2025250    183200   22.7000  148.0800       9.2        95       799        93
VIS    2025250    183200   22.6900  148.0300       9.4        93       853        93
VIS    2025250    183200   22.6900  148.0100       9.6        92       839        92
VIS    2025250    183200   22.6900  147.8900       8.2        89       799        93
VIS    2025250    183200   22.6900  147.8700       8.4        87       801        91
VIS    2025250    183200   22.6900  147.8400       8.6        86       832        95
VIS    2025250    183200   22.6800  147.8200       8.9        84       834        94
VIS    2025250    183200   22.6800  147.7700       8.2        82       834        92
VIS    2025250    183200   22.6800  147.7700       8.1        83       837        92
VIS    2025250    183200   22.6900  147.6200       8.1        82       880        91
VIS    2025250    183200   22.6900  147.6200       8.0        83       880        91
VIS    2025250    183200   22.6900  147.5800       8.3        83       910        91
VIS    2025250    183200   22.6900  147.5600       8.8        83       921        93
VIS    2025250    183200   22.6800  147.5200       9.7        86       957        98
VIS    2025250    183200   22.6700  147.5100       9.8        87       957        99
VIS    2025250    183200   22.6800  147.4700       8.5        88       977        96
VIS    2025250    183200   22.6800  147.4600       8.4        88       977        96
VIS    2025250    183200   22.6900  147.4200       8.3        91       943        95
VIS    2025250    183200   22.6800  147.4100       8.5        88       929        94
VIS    2025250    183200   22.6700  147.0100       8.5        86       999        93
VIS    2025250    183200   22.6800  146.8600       7.0        99       803        93
VIS    2025250    183200   22.6700  146.8400       7.1        95       813        96
VIS    2025250    183200   22.6600  146.8000       7.1       102       859        99
VIS    2025250    183200   22.6700  146.8000       7.4       101       859        99
VIS    2025250    183200   22.6400  144.2700      11.4        83       984        97
VIS    2025250    183200   22.6400  144.2500      12.6        84       975        96
VIS    2025250    183200   22.6400  144.2400      13.3        86       975        96
VIS    2025250    183200   22.6400  144.2100      13.7        86       975        95
VIS    2025250    183200   22.6300  143.1900      11.7        87       993        96
VIS    2025250    183200   22.6300  143.1700      11.8        87       981        97
VIS    2025250    183200   22.6400  143.1300      10.7        86       925        92
VIS    2025250    183200   22.6400  143.0700       9.7        88       917        94
VIS    2025250    183200   22.6500  143.0400      10.0        86       919        93
VIS    2025250    183200   22.6500  143.0200      10.0        82       927        90
VIS    2025250    183200   22.6400  142.9900      10.5        83       964        91
VIS    2025250    183200   22.6400  142.7800      11.2        89      1000        98
VIS    2025250    183200   22.6500  142.7600      11.0        88       982        99
VIS    2025250    183200   22.6400  142.7400      11.5        87       929       100
VIS    2025250    183200   22.6200  142.7200      11.3        88       929       100
VIS    2025250    183200   22.6200  142.6500      10.8        89       958       100
VIS    2025250    183200   22.6400  142.6300      11.3        90       980       100
VIS    2025250    183200   22.6200  142.5900      10.0        91       997        99
VIS    2025250    183200   22.6400  142.5600      10.1        89       984        98
VIS    2025250    183200   22.6400  142.5500      10.2        89       981        98
VIS    2025250    183200   22.6200  142.5100      10.1        92       970        96
VIS    2025250    183200   22.6200  142.5000      10.0        93       970        96
VIS    2025250    183200   22.6400  142.4600       9.8        90       969        96
VIS    2025250    183200   22.6200  142.4500       9.3        88       957        94
VIS    2025250    183200   22.7100  151.2900       7.9        76       980        90
VIS    2025250    183200   22.7100  151.1300       6.8        85       949        96
VIS    2025250    183200   22.7000  151.1100       6.2        89       940        99
VIS    2025250    183200   22.7000  151.0700       4.4        93       923        98
VIS    2025250    183200   22.7000  151.0700       4.3        94       923        96
VIS    2025250    183200   22.6800  149.8200       9.6       112       872        93
VIS    2025250    183200   22.6900  149.8100       9.3       111       872        94
VIS    2025250    183200   22.6800  149.7900       8.9       110       865       100
VIS    2025250    183200   22.6800  149.7500       9.1       112       867        98
VIS    2025250    183200   22.6800  149.7300       9.6       114       867        93
VIS    2025250    183200   22.6900  149.4900       7.6       104       854        97
VIS    2025250    183200   22.6900  149.4600       7.6       103       901        98
VIS    2025250    183200   22.6800  149.4500       7.6       103       901        94
VIS    2025250    183200   22.6800  148.5800       9.0        80       996        94
VIS    2025250    183200   22.6600  148.5500       9.3        80       961        93
VIS    2025250    183200   22.6700  148.5400       9.5        80       961        95
VIS    2025250    183200   22.6600  148.3600      12.3        90       992        92
VIS    2025250    183200   22.6600  148.3200      12.2        93       935        92
VIS    2025250    183200   22.6700  148.3000      12.0        92       925        91
VIS    2025250    183200   22.6600  148.2700      10.9        84       886        91
VIS    2025250    183200   22.6700  148.2500      10.4        79       877        90
VIS    2025250    183200   22.6700  148.1500       8.2        90       788        91
VIS    2025250    183200   22.6700  148.1300       7.9        91       792        92
VIS    2025250    183200   22.6500  148.1000       8.3        92       799        93
VIS    2025250    183200   22.6500  148.0700       8.9        92       853        97
VIS    2025250    183200   22.6500  148.0600       9.2        92       853        97
VIS    2025250    183200   22.6500  148.0300       9.6        92       827        95
VIS    2025250    183200   22.6700  147.9900       9.5        90       796        90
VIS    2025250    183200   22.6700  147.9900       9.5        89       794        90
VIS    2025250    183200   22.6600  147.8900       8.9        88       807        92
VIS    2025250    183200   22.6700  147.8800       8.7        87       807        92
VIS    2025250    183200   22.6500  147.8500       9.0        81       896        93
VIS    2025250    183200   22.6700  147.8100       9.0        84       855        95
VIS    2025250    183200   22.6600  147.8100       9.0        83       875        95
VIS    2025250    183200   22.6700  147.7800       8.5        83       844        93
VIS    2025250    183200   22.6700  147.6300       8.5        83       883        90
VIS    2025250    183200   22.6500  147.6000       9.4        83       913        95
VIS    2025250    183200   22.6600  147.5800       9.4        84       910        96
VIS    2025250    183200   22.6700  147.5400       9.8        87       933        98
VIS    2025250    183200   22.6700  147.5100      10.1        87       964        99
VIS    2025250    183200   22.6500  147.5000       9.9        90       965        97
VIS    2025250    183200   22.6500  147.4700       8.7        88       952        97
VIS    2025250    183200   22.6600  147.4400       8.1        83       914        94
VIS    2025250    183200   22.6600  147.4300       8.1        78       907        90
VIS    2025250    183200   22.6400  147.3800       8.7        81       923        91
VIS    2025250    183200   22.6400  147.0500       9.0        83       994        96
VIS    2025250    183200   22.6500  147.0400       8.7        82       988        90
VIS    2025250    183200   22.6600  147.0100       8.3        83       984        93
VIS    2025250    183200   22.6400  146.9100       6.0        89       771        90
VIS    2025250    183200   22.6400  146.8600       7.2        95       762        93
VIS    2025250    183200   22.6400  146.8400       7.1       100       744        91
VIS    2025250    183200   22.6500  146.8200       6.7       103       803        97
VIS    2025250    183200   22.6400  146.4000       8.7       132       735        90
VIS    2025250    183200   22.6100  144.2600      11.0        87       982        90
VIS    2025250    183200   22.6100  144.2600      11.3        86       975        91
VIS    2025250    183200   22.6100  144.2300      12.2        87       974        93
VIS    2025250    183200   22.6300  144.2100      13.0        85       975        96
VIS    2025250    183200   22.6300  143.7700       9.8        97       990        95
VIS    2025250    183200   22.6300  143.7100      11.3        96       998        97
VIS    2025250    183200   22.6100  143.6800      10.9        89       995        98
VIS    2025250    183200   22.6100  143.4600       8.9        90       995        96
VIS    2025250    183200   22.6000  143.4200       9.7        91       973        97
VIS    2025250    183200   22.6100  143.4000      10.7        93       976        98
VIS    2025250    183200   22.6100  143.1500      11.8        88       981        95
VIS    2025250    183200   22.6200  143.1400      11.5        89       971        98
VIS    2025250    183200   22.6000  143.1100      11.3        86       945        99
VIS    2025250    183200   22.6000  143.0900      10.7        86       927        99
VIS    2025250    183200   22.6200  143.0600      10.0        87       917        95
VIS    2025250    183200   22.6200  143.0400      10.0        86       919        97
VIS    2025250    183200   22.6100  143.0200      10.5        86       951        98
VIS    2025250    183200   22.6100  142.9900      10.6        85       964        94
VIS    2025250    183200   22.6000  142.7800      12.5        93       999        98
VIS    2025250    183200   22.6100  142.6300      10.8        89       992        99
VIS    2025250    183200   22.6000  142.5900      10.2        90       997        99
VIS    2025250    183200   22.6200  142.5600      10.2        92       981        99
VIS    2025250    183200   22.6200  142.5400      10.3        91       970        97
VIS    2025250    183200   22.6100  142.5100       9.7        90       966        93
VIS    2025250    183200   22.6100  142.5000       9.5        93       966        96
VIS    2025250    183200   22.6100  142.4500       9.2        89       957        94
VIS    2025250    183200   22.6800  151.1600       6.6        76       936        93
VIS    2025250    183200   22.6800  151.1200       6.4        86       921        92
VIS    2025250    183200   22.6900  151.0900       5.6        91       923        98
VIS    2025250    183200   22.6900  151.0700       4.4        92       923        95
VIS    2025250    183200   22.6700  149.8300      10.0       112       872        95
VIS    2025250    183200   22.6600  149.7900       9.3       109       866        99
VIS    2025250    183200   22.6600  149.7700       9.5       111       867        98
VIS    2025250    183200   22.6700  149.7600       9.0       110       867        99
VIS    2025250    183200   22.6500  149.4600       7.9       104       775        90
VIS    2025250    183200   22.6500  149.4500       8.0       104       792        91
VIS    2025250    183200   22.6500  148.5300       9.7        81       970        95
VIS    2025250    183200   22.6500  148.5200       9.9        81       970        96
VIS    2025250    183200   22.6500  148.3600      11.9        89       992        95
VIS    2025250    183200   22.6300  148.3200      11.6        88       923        94
VIS    2025250    183200   22.6400  148.2900      11.4        88       887        90
VIS    2025250    183200   22.6400  148.1400       7.7        88       792        90
VIS    2025250    183200   22.6300  148.0900       8.2        89       801        94
VIS    2025250    183200   22.6400  148.0800       8.7        90       860        97
VIS    2025250    183200   22.6400  148.0600       9.3        91       855        97
VIS    2025250    183200   22.6500  148.0300       9.7        92       827        94
VIS    2025250    183200   22.6400  148.0000       9.7        92       794        91
VIS    2025250    183200   22.6300  147.9000       9.3        89       829        91
VIS    2025250    183200   22.6400  147.8700       9.0        84       875        93
VIS    2025250    183200   22.6500  147.8600       9.0        81       896        93
VIS    2025250    183200   22.6400  147.8300       9.2        78       912        94
VIS    2025250    183200   22.6400  147.8100       9.3        80       878        93
VIS    2025250    183200   22.6400  147.7800       9.1        80       848        92
VIS    2025250    183200   22.6300  147.6800       9.7        87       883        95
VIS    2025250    183200   22.6400  147.6500       9.4        88       883        91
VIS    2025250    183200   22.6400  147.6100       9.3        85       913        95
VIS    2025250    183200   22.6300  147.6000       9.6        84       929        99
VIS    2025250    183200   22.6200  147.5600       9.8        88       931       100
VIS    2025250    183200   22.6300  147.5400       9.9        92       933        99
VIS    2025250    183200   22.6400  147.5100      10.0        90       964        97
VIS    2025250    183200   22.6300  147.4900       9.8        89       957        96
VIS    2025250    183200   22.6400  147.4800       9.5        89       952        94
VIS    2025250    183200   22.6200  147.3700       8.4        89       920        92
VIS    2025250    183200   22.6100  147.0700       8.7        83       994        96
VIS    2025250    183200   22.6200  147.0500       8.6        83       987        94
VIS    2025250    183200   22.6300  147.0000       7.6        72       974        92
VIS    2025250    183200   22.6200  146.9700       7.5        75       914        92
VIS    2025250    183200   22.5900  144.2900      10.3        77       990        93
VIS    2025250    183200   22.6100  144.2400      11.9        87       974        94
VIS    2025250    183200   22.6000  144.2200      11.4        87       953        93
VIS    2025250    183200   22.5800  143.7900      10.0        94       999        98
VIS    2025250    183200   22.5800  143.7800       9.0        95       999        96
VIS    2025250    183200   22.5900  143.7300      10.2        92       989        97
VIS    2025250    183200   22.5800  143.7200      10.7        92       985        99
VIS    2025250    183200   22.5800  143.6900      10.8        90       987        99
VIS    2025250    183200   22.5800  143.6700      11.1        89       995       100
VIS    2025250    183200   22.5900  143.5800      10.7        92       999        91
VIS    2025250    183200   22.5800  143.5500      10.6        92       999        92
VIS    2025250    183200   22.5900  143.4600       9.3        92       995        96
VIS    2025250    183200   22.5800  143.4500       9.8        93       973        97
VIS    2025250    183200   22.5900  143.4300       9.8        91       973        96
VIS    2025250    183200   22.5800  143.3800      11.1        88       966        98
VIS    2025250    183200   22.5900  143.3600      10.8        89       973        98
VIS    2025250    183200   22.5800  143.3300      10.7        89       972        99
VIS    2025250    183200   22.6000  143.1300      11.9        87       984        98
VIS    2025250    183200   22.6000  143.1000      11.2        85       945        99
VIS    2025250    183200   22.6000  143.1000      11.0        85       945        99
VIS    2025250    183200   22.5900  142.7900      12.7        93       999        98
VIS    2025250    183200   22.5800  142.7700      13.0        92       972        97
VIS    2025250    183200   22.5800  142.7300      12.2        91       962        94
VIS    2025250    183200   22.5700  142.7300      12.2        90       959        93
VIS    2025250    183200   22.5900  142.7000      10.9        89       976        93
VIS    2025250    183200   22.5900  142.6700      10.6        87       996        92
VIS    2025250    183200   22.5700  142.5900      10.1        91       978        98
VIS    2025250    183200   22.5800  142.5600       9.9        94       955        98
VIS    2025250    183200   22.5700  142.5300       9.7        88       927        98
VIS    2025250    183200   22.5800  142.5300       9.6        87       938        97
VIS    2025250    183200   22.5700  142.5000      10.0        81       916        93
VIS    2025250    183200   22.5800  142.4600       9.8        89       922        95
VIS    2025250    183200   22.5700  142.4500      10.2        91       922        97
VIS    2025250    183200   22.6500  151.4400       5.9        79       991        93
VIS    2025250    183200   22.6600  151.1500       6.4        79       934        90
VIS    2025250    183200   22.6500  151.0600       6.3        95       862        94
VIS    2025250    183200   22.6500  151.0100       4.9       104       857        95
VIS    2025250    183200   22.6300  149.9000      12.1       117       887        90
VIS    2025250    183200   22.6300  149.8800      12.0       116       880        92
VIS    2025250    183200   22.6300  149.8700      11.9       116       878        92
VIS    2025250    183200   22.6300  149.8300      11.0       114       869        95
VIS    2025250    183200   22.6400  149.8100       9.9       109       868        97
VIS    2025250    183200   22.6300  149.7900      10.2       112       869        93
VIS    2025250    183200   22.6400  149.4600       8.0       104       784        90
VIS    2025250    183200   22.6300  148.5800       9.6        83       996        99
VIS    2025250    183200   22.6200  148.3300      11.2        87       949        96
VIS    2025250    183200   22.6200  148.3200      11.1        87       949        96
VIS    2025250    183200   22.6100  148.3000      11.2        87       889        92
VIS    2025250    183200   22.6000  148.2500       9.7        85       800        90
VIS    2025250    183200   22.6200  148.1500       7.7        88       791        91
VIS    2025250    183200   22.6100  148.1000       8.1        88       827        95
VIS    2025250    183200   22.6100  148.0800       8.6        89       872        96
VIS    2025250    183200   22.6200  148.0600       9.0        90       866        96
VIS    2025250    183200   22.6200  147.9600       9.6        90       795        90
VIS    2025250    183200   22.6200  147.9200       9.4        90       829        92
VIS    2025250    183200   22.6100  147.8300       8.8        80       879        91
VIS    2025250    183200   22.6100  147.7900       9.3        79       856        91
VIS    2025250    183200   22.6100  147.7900       9.3        79       855        91
VIS    2025250    183200   22.6000  147.7100      10.1        81       905        94
VIS    2025250    183200   22.6000  147.6700      10.5        86       927        98
VIS    2025250    183200   22.6000  147.6400      10.3        88       964        98
VIS    2025250    183200   22.6000  147.6100       9.7        87       944        99
VIS    2025250    183200   22.6000  147.6000       9.6        88       935       100
VIS    2025250    183200   22.6000  147.5800       9.9        90       929        99
VIS    2025250    183200   22.6200  147.5500       9.8        90       947        99
VIS    2025250    183200   22.6000  147.5100       9.3        91       913        98
VIS    2025250    183200   22.6200  147.5100       9.5        91       933        96
VIS    2025250    183200   22.6000  147.3600       9.0        87       926        96
VIS    2025250    183200   22.5900  147.0700       8.5        82       974        95
VIS    2025250    183200   22.6000  147.0500       8.8        83       974        95
VIS    2025250    183200   22.6100  147.0200       8.0        80       962        90
VIS    2025250    183200   22.5900  146.9900       7.1        80       953        90
VIS    2025250    183200   22.6000  146.4200       8.5       120       714        93
VIS    2025250    183200   22.5800  146.3300      11.8        91       963        93
VIS    2025250    183200   22.5800  144.2900      10.2        79       990        95
VIS    2025250    183200   22.5600  143.8000      10.8       100       999        93
VIS    2025250    183200   22.5600  143.7900      10.8       100       980        92
VIS    2025250    183200   22.5600  143.7600      10.6        97       979        97
VIS    2025250    183200   22.5800  143.7200      10.7        94       985        97
VIS    2025250    183200   22.5700  143.7000      10.7        92       983        99
VIS    2025250    183200   22.5600  143.6900      10.8        92       980        98
VIS    2025250    183200   22.5500  143.6700      11.2        91       970        99
VIS    2025250    183200   22.5600  143.6300      11.5        87       985       100
VIS    2025250    183200   22.5500  143.5300      10.9        95       999        95
VIS    2025250    183200   22.5500  143.5200      11.1        94       998        97
VIS    2025250    183200   22.5600  143.4700      10.0        97       995        95
VIS    2025250    183200   22.5700  143.4500       9.9        94       972        97
VIS    2025250    183200   22.5600  143.4400      10.6        95       965        97
VIS    2025250    183200   22.5700  143.4000      10.8        91       942        98
VIS    2025250    183200   22.5600  143.3700      10.8        91       953        98
VIS    2025250    183200   22.5700  143.3500      10.6        90       972        98
VIS    2025250    183200   22.5500  143.3300      10.6        89       969        97
VIS    2025250    183200   22.5500  143.3100      10.7        88       967        97
VIS    2025250    183200   22.5500  142.8000      12.0        90       979        99
VIS    2025250    183200   22.5700  142.7800      12.9        93       978        98
VIS    2025250    183200   22.5500  142.7500      12.9        91       965        96
VIS    2025250    183200   22.5700  142.7400      12.5        92       959        92
VIS    2025250    183200   22.5700  142.7100      11.6        88       976        96
VIS    2025250    183200   22.5600  142.6600      11.9        85       996        97
VIS    2025250    183200   22.5700  142.6000      10.2        91       988        97
VIS    2025250    183200   22.5500  142.5800      10.2        92       970        98
VIS    2025250    183200   22.5500  142.5500      10.1        92       927        98
VIS    2025250    183200   22.5600  142.5200      10.2        85       919        99
VIS    2025250    183200   22.5500  142.5200      10.2        85       917        98
VIS    2025250    183200   22.5500  142.4900      10.7        86       916        99
VIS    2025250    183200   22.5700  142.4500      10.4        92       918        97
VIS    2025250    183200   22.5700  142.4400      10.4        92       922        97
VIS    2025250    183200   22.6400  151.4500       6.7        82       991        91
VIS    2025250    183200   22.6300  151.0100       5.1       104       857        92
VIS    2025250    183200   22.6100  149.9100      12.2       116       897        90
VIS    2025250    183200   22.6000  149.8600      11.4       113       889        93
VIS    2025250    183200   22.6100  149.8300      10.8       112       883        95
VIS    2025250    183200   22.6000  149.8200      10.3       109       883        96
VIS    2025250    183200   22.6200  149.7800      10.2       113       869        92
VIS    2025250    183200   22.6000  149.7600      10.0       113       869        91
VIS    2025250    183200   22.6000  149.5700       7.8       117       760        91
VIS    2025250    183200   22.6200  149.4500       8.3       103       862        98
VIS    2025250    183200   22.6100  149.4300       8.3       103       888        97
VIS    2025250    183200   22.5800  148.3300       9.9        85       959        99
VIS    2025250    183200   22.5800  148.3000      10.4        85       919        96
VIS    2025250    183200   22.5900  148.2700      10.1        86       883        94
VIS    2025250    183200   22.6000  148.1400       8.2        89       792        91
VIS    2025250    183200   22.5800  148.1300       8.5        89       793        91
VIS    2025250    183200   22.5800  148.0800       8.8        90       872        97
VIS    2025250    183200   22.5800  148.0600       9.4        93       889        97
VIS    2025250    183200   22.6000  148.0400       9.6        92       804        90
VIS    2025250    183200   22.5800  147.9700       9.2        91       798        92
VIS    2025250    183200   22.5800  147.9400       9.0        92       827        94
VIS    2025250    183200   22.5900  147.9200       9.3        91       829        90
VIS    2025250    183200   22.5700  147.8600      10.2        86       857        93
VIS    2025250    183200   22.5700  147.8400       9.5        85       876        96
VIS    2025250    183200   22.5800  147.8100       9.2        83       888        96
VIS    2025250    183200   22.5800  147.7800       9.7        79       865        92
VIS    2025250    183200   22.5800  147.7700       9.9        78       880        92
VIS    2025250    183200   22.5800  147.7100       9.6        82       911        91
VIS    2025250    183200   22.5900  147.7000      10.1        82       919        95
VIS    2025250    183200   22.5700  147.6600      11.0        82       966        94
VIS    2025250    183200   22.5800  147.6500      11.0        83       969        95
VIS    2025250    183200   22.5700  147.6000      10.0        87       928        99
VIS    2025250    183200   22.5700  147.6000      10.0        88       928        98
VIS    2025250    183200   22.5700  147.5600       9.7        92       922        94
VIS    2025250    183200   22.5800  147.5300       9.3        91       913        96
VIS    2025250    183200   22.5900  147.5200       9.2        91       913        97
VIS    2025250    183200   22.5900  147.4100       8.8        87       835        90
VIS    2025250    183200   22.5700  147.3900       8.8        87       839        90
VIS    2025250    183200   22.5800  147.0700       8.5        82       974        94
VIS    2025250    183200   22.5600  147.0500       9.1        89       974        94
VIS    2025250    183200   22.5700  146.3300      11.0        88       962        92
VIS    2025250    183200   22.5700  146.3000      11.7        83       969       100
VIS    2025250    183200   22.5500  143.8200      10.1       101      1000        92
VIS    2025250    183200   22.5500  143.7900      10.5       100       979        91
VIS    2025250    183200   22.5300  143.7700      10.1        99       979        92
VIS    2025250    183200   22.5400  143.7300      10.6        96       980        94
VIS    2025250    183200   22.5500  143.7100      10.5        93       980        94
VIS    2025250    183200   22.5300  143.6800      11.0        96       955        95
VIS    2025250    183200   22.5300  143.6700      11.1        94       955        97
VIS    2025250    183200   22.5300  143.6300      11.4        96       968        98
VIS    2025250    183200   22.5300  143.6200      11.5        96       975        98
VIS    2025250    183200   22.5400  143.5800      11.5        99       987        96
VIS    2025250    183200   22.5300  143.5600      11.6       100       987        95
VIS    2025250    183200   22.5400  143.5500      11.1        97       998        95
VIS    2025250    183200   22.5500  143.5200      10.7        93       999        94
VIS    2025250    183200   22.5300  143.4800      10.4        90       981        95
VIS    2025250    183200   22.5400  143.4400      10.6        97       965        91
VIS    2025250    183200   22.5400  143.4200      10.4        95       950        92
VIS    2025250    183200   22.5300  143.3900      10.4        91       947        96
VIS    2025250    183200   22.5300  143.3500      10.9        92       967        97
VIS    2025250    183200   22.5300  143.3300      10.7        90       961        96
VIS    2025250    183200   22.5500  143.3200      10.6        89       967        98
VIS    2025250    183200   22.5300  143.2900      11.0        88       965        99
VIS    2025250    183200   22.5300  143.2700      11.6        86       979       100
VIS    2025250    183200   22.5300  143.2400      12.3        86       979        99
VIS    2025250    183200   22.5400  142.8000      11.4        89       979        98
VIS    2025250    183200   22.5400  142.7600      12.9        90       976        96
VIS    2025250    183200   22.5200  142.7400      12.5        92       972        98
VIS    2025250    183200   22.5200  142.7100      11.5        89       957        99
VIS    2025250    183200   22.5200  142.7000      11.3        88       957        99
VIS    2025250    183200   22.5200  142.6700      11.2        85       952       100
VIS    2025250    183200   22.5300  142.6500      11.6        86       984        99
VIS    2025250    183200   22.5200  142.6100      11.0        89       984       100
VIS    2025250    183200   22.5200  142.6000      10.9        90       984       100
VIS    2025250    183200   22.5200  142.5600      10.4        89       935        99
VIS    2025250    183200   22.5300  142.5500      10.3        89       927        99
VIS    2025250    183200   22.5400  142.5200      10.2        85       917        98
VIS    2025250    183200   22.5200  142.4900      10.5        90       916        99
VIS    2025250    183200   22.5400  142.4700      11.2        92       916        98
VIS    2025250    183200   22.6000  151.0700       6.6        83       911        94
VIS    2025250    183200   22.6200  151.0500       6.5        93       862        91
VIS    2025250    183200   22.6000  151.0200       4.9        95       858        90
VIS    2025250    183200   22.6000  149.8600      11.2       113       899        92
VIS    2025250    183200   22.5800  149.8500      10.9       112       899        92
VIS    2025250    183200   22.5900  149.8100      10.0       109       883        97
VIS    2025250    183200   22.5900  149.8000       9.7       107       876        98
VIS    2025250    183200   22.5700  149.7600       9.1       102       870        96
VIS    2025250    183200   22.5900  149.5600       7.4       113       762        92
VIS    2025250    183200   22.5900  149.5300       7.5       108       762        91
VIS    2025250    183200   22.5900  149.5000       7.3       107       770        90
VIS    2025250    183200   22.5900  149.4800       7.9       103       792        91
VIS    2025250    183200   22.5500  148.3600       9.3        82       995        96
VIS    2025250    183200   22.5500  148.3300       9.8        83       972        96
VIS    2025250    183200   22.5600  148.3100      10.2        83       919        96
VIS    2025250    183200   22.5500  148.2700       9.7        84       892        95
VIS    2025250    183200   22.5500  148.2600       9.6        85       892        95
VIS    2025250    183200   22.5500  148.2300       9.5        85       866        96
VIS    2025250    183200   22.5500  148.1900       9.2        87       798        91
VIS    2025250    183200   22.5600  148.1800       9.1        88       795        91
VIS    2025250    183200   22.5500  148.1500       8.9        88       792        91
VIS    2025250    183200   22.5700  148.1200       8.5        89       798        92
VIS    2025250    183200   22.5600  148.0900       8.7        87       844        93
VIS    2025250    183200   22.5600  148.0900       8.8        88       844        94
VIS    2025250    183200   22.5500  148.0600       9.5        92       873        98
VIS    2025250    183200   22.5600  148.0400       9.7        94       807        93
VIS    2025250    183200   22.5600  148.0100       9.3        89       798        90
VIS    2025250    183200   22.5500  147.9700       9.2        91       827        93
VIS    2025250    183200   22.5500  147.9600       9.2        91       827        93
VIS    2025250    183200   22.5700  147.9400       9.1        92       869        93
VIS    2025250    183200   22.5500  147.9000       9.8        89       883        94
VIS    2025250    183200   22.5500  147.8800      10.5        87       883        95
VIS    2025250    183200   22.5500  147.8500      10.6        85       906        94
VIS    2025250    183200   22.5700  147.8300       9.6        84       879        96
VIS    2025250    183200   22.5600  147.8000       9.3        77       921        96
VIS    2025250    183200   22.5700  147.7800       9.8        77       888        92
VIS    2025250    183200   22.5700  147.6600      10.8        81       966        92
VIS    2025250    183200   22.5600  147.6400      10.8        82       969        93
VIS    2025250    183200   22.5500  147.6100      10.1        84       945        97
VIS    2025250    183200   22.5600  147.5900      10.1        88       927        96
VIS    2025250    183200   22.5600  147.5800      10.1        89       911        95
VIS    2025250    183200   22.5500  147.3900       8.8        85       838        91
VIS    2025250    183200   22.5500  147.3600       8.6        82       844        90
VIS    2025250    183200   22.5500  147.3500       8.7        81       910        97
VIS    2025250    183200   22.5300  146.3900       7.0       100       763        91
VIS    2025250    183200   22.5500  146.3700       9.1        95       800        93
VIS    2025250    183200   22.5400  146.3100      11.4        83       906        98
VIS    2025250    183200   22.5500  146.2900      11.2        81       942        99
VIS    2025250    183200   22.5300  146.2700      11.2        76       942        97
VIS    2025250    183200   22.5000  143.7600      10.0       102       979        90
VIS    2025250    183200   22.5000  143.7200      11.5       101       963        95
VIS    2025250    183200   22.5200  143.7100      11.3        98       964        94
VIS    2025250    183200   22.5200  143.6700      11.1        96       955        96
VIS    2025250    183200   22.5100  143.6400      11.1        94       950        98
VIS    2025250    183200   22.5100  143.6300      11.3        96       949        97
VIS    2025250    183200   22.5000  143.6000      12.0        94       964        98
VIS    2025250    183200   22.5100  143.5800      12.3        96       986        97
VIS    2025250    183200   22.5100  143.5500      12.0        97       987        96
VIS    2025250    183200   22.5000  143.5200      10.2        91       975        92
VIS    2025250    183200   22.5000  143.5100      10.0        88       946        91
VIS    2025250    183200   22.5000  143.4800      10.3        88       946        90
VIS    2025250    183200   22.5200  143.4000      10.3        91       946        91
VIS    2025250    183200   22.5200  143.3900      10.4        91       946        95
VIS    2025250    183200   22.5100  143.3500      10.8        90       960        96
VIS    2025250    183200   22.5200  143.3200      10.7        89       959        95
VIS    2025250    183200   22.5000  143.2900      11.2        89       939        99
VIS    2025250    183200   22.5000  143.2700      11.4        89       957       100
VIS    2025250    183200   22.5000  143.2600      11.4        88       957       100
VIS    2025250    183200   22.5000  143.2300      11.0        84       976       100
VIS    2025250    183200   22.5100  142.7800      11.3        90       988        98
VIS    2025250    183200   22.5100  142.7600      11.9        90       988        99
VIS    2025250    183200   22.5000  142.7400      11.8        90       957        99
VIS    2025250    183200   22.5000  142.7100      11.1        85       924        98
VIS    2025250    183200   22.5100  142.7000      11.0        85       924        98
VIS    2025250    183200   22.5100  142.6600      10.9        86       952        99
VIS    2025250    183200   22.5100  142.6300      11.3        89       984        99
VIS    2025250    183200   22.5100  142.6100      11.3        89       984        99
VIS    2025250    183200   22.5200  142.6000      11.0        90       972        99
VIS    2025250    183200   22.5100  142.5700      10.8        86       935        99
VIS    2025250    183200   22.5100  142.5500      10.7        84       924        99
VIS    2025250    183200   22.5100  142.5100      10.4        86       917        99
VIS    2025250    183200   22.4900  142.5000      10.1        89       918        97
VIS    2025250    183200   22.5000  142.4800      10.5        96       916        96
VIS    2025250    183200   22.5800  151.1800       7.7        83       978        93
VIS    2025250    183200   22.5700  151.1700       8.2        83       963        91
VIS    2025250    183200   22.5700  151.1400       7.9        86       947        91
VIS    2025250    183200   22.5700  151.0800       6.9        84       908        93
VIS    2025250    183200   22.5700  151.0700       6.5        83       887        94
VIS    2025250    183200   22.5800  151.0400       4.9        84       857        93
VIS    2025250    183200   22.5700  149.8300      10.2       109       904        94
VIS    2025250    183200   22.5500  149.8100       9.8       111       896        96
VIS    2025250    183200   22.5600  149.7800       9.3       102       872        96
VIS    2025250    183200   22.5500  149.7500       8.9        99       867        97
VIS    2025250    183200   22.5500  149.4900       6.9       101       888        95
VIS    2025250    183200   22.5700  149.4800       7.7       102       855        97
VIS    2025250    183200   22.5500  149.4600       8.2       101       932        91
VIS    2025250    183200   22.5400  148.3600       9.3        83       990        97
VIS    2025250    183200   22.5300  148.3200       9.8        86       957        99
VIS    2025250    183200   22.5400  148.3200      10.1        84       955        98
VIS    2025250    183200   22.5300  148.2900       9.7        86       919        98
VIS    2025250    183200   22.5400  148.2500       9.3        84       901        96
VIS    2025250    183200   22.5400  148.2300       9.4        84       894        97
VIS    2025250    183200   22.5300  148.2000       9.4        83       822        92
VIS    2025250    183200   22.5300  148.1900       9.2        84       804        91
VIS    2025250    183200   22.5500  148.1600       8.9        87       792        91
VIS    2025250    183200   22.5300  148.1200       8.4        85       812        92
VIS    2025250    183200   22.5300  148.1100       8.3        86       841        93
VIS    2025250    183200   22.5200  148.0900       8.9        85       873        93
VIS    2025250    183200   22.5300  148.0400       9.4        90       819        94
VIS    2025250    183200   22.5200  148.0400       9.2        89       819        94
VIS    2025250    183200   22.5200  148.0000       8.9        88       857        90
VIS    2025250    183200   22.5400  147.9500       9.4        91       860        94
VIS    2025250    183200   22.5400  147.9300       9.4        90       878        93
VIS    2025250    183200   22.5300  147.9100       9.6        87       878        95
VIS    2025250    183200   22.5400  147.8800      10.4        86       899        96
VIS    2025250    183200   22.5400  147.8400      10.5        84       907        94
VIS    2025250    183200   22.5400  147.8400      10.5        84       914        95
VIS    2025250    183200   22.5400  147.7900       9.7        77       929        96
VIS    2025250    183200   22.5400  147.7700      10.3        75       931        93
VIS    2025250    183200   22.5400  147.7600      10.4        75       933        92
VIS    2025250    183200   22.5200  147.6900       9.2        79       989        97
VIS    2025250    183200   22.5200  147.6800       9.4        81       989        96
VIS    2025250    183200   22.5200  147.6500      10.1        87       971        97
VIS    2025250    183200   22.5300  147.6100      10.2        88       945        94
VIS    2025250    183200   22.5300  147.5900      10.5        89       919        94
VIS    2025250    183200   22.5100  146.5000       9.6       108       738        93
VIS    2025250    183200   22.5200  146.2700      11.2        75       942        94
VIS    2025250    183200   22.5200  146.2600      11.1        74       942        95
VIS    2025250    183200   22.5000  146.2300      11.4        76       973        92
VIS    2025250    183200   22.5000  146.2000      12.5        80       974        99
VIS    2025250    183200   22.5000  145.6600      10.6        90       994        91
VIS    2025250    183200   22.5000  145.6000      12.0        84       998        99
VIS    2025250    183200   22.5000  145.5800      11.2        82       980        99
VIS    2025250    183200   22.4900  144.0100      14.1        86       995        91
VIS    2025250    183200   22.5000  143.7600      10.3       102       979        91
VIS    2025250    183200   22.4800  143.7300      10.5       101       958        96
VIS    2025250    183200   22.4900  143.6900      10.8        99       950        96
VIS    2025250    183200   22.4900  143.6800      10.9        98       950        96
VIS    2025250    183200   22.5000  143.6600      11.4        95       950        97
VIS    2025250    183200   22.4900  143.6100      12.0        96       924        94
VIS    2025250    183200   22.4900  143.6100      12.0        95       953        96
VIS    2025250    183200   22.4800  143.5800      11.5        93       953        98
VIS    2025250    183200   22.4800  143.5600      11.4        94       955        93
VIS    2025250    183200   22.4900  143.5300      10.8        93       941        91
VIS    2025250    183200   22.4900  143.5100      10.5        89       941        94
VIS    2025250    183200   22.4800  143.4700      10.6        88       918        98
VIS    2025250    183200   22.4800  143.4400      10.1        91       917        94
VIS    2025250    183200   22.4800  143.3600      10.4        92       953        94
VIS    2025250    183200   22.4900  143.3600      10.7        89       958        95
VIS    2025250    183200   22.4800  143.3300      10.8        86       957       100
VIS    2025250    183200   22.4700  143.2900      11.1        89       939        97
VIS    2025250    183200   22.4800  143.2700      11.3        91       943        97
VIS    2025250    183200   22.4800  143.2600      11.1        91       954        98
VIS    2025250    183200   22.4800  143.2300      10.7        89       963        99
VIS    2025250    183200   22.4900  142.8000      11.9        91       988        99
VIS    2025250    183200   22.4800  142.7700      12.2        92       981        99
VIS    2025250    183200   22.4900  142.7700      12.0        91       988        99
VIS    2025250    183200   22.4900  142.7300      11.6        90       949        99
VIS    2025250    183200   22.4900  142.7100      11.0        85       924        97
VIS    2025250    183200   22.4900  142.6600      10.3        83       949        92
VIS    2025250    183200   22.4900  142.6200      11.2        88       972        95
VIS    2025250    183200   22.4900  142.6100      11.3        87       972        96
VIS    2025250    183200   22.4900  142.5900      11.3        86       955        95
VIS    2025250    183200   22.4900  142.5500      11.0        83       922        97
VIS    2025250    183200   22.4700  142.5300      10.6        83       920        98
VIS    2025250    183200   22.4700  142.5200      10.4        83       922        96
VIS    2025250    183200   22.4800  142.4900       9.9        88       920        95
VIS    2025250    183200   22.5700  151.1800       8.3        81       963        90
VIS    2025250    183200   22.5600  151.1500       8.3        83       953        91
VIS    2025250    183200   22.5400  151.1300       7.5        81       947        93
VIS    2025250    183200   22.5500  151.0900       6.8        84       921        94
VIS    2025250    183200   22.5600  151.0700       6.7        84       887        93
VIS    2025250    183200   22.5600  151.0600       5.5        87       869        98
VIS    2025250    183200   22.5300  149.7900       9.5       107       884        96
VIS    2025250    183200   22.5200  149.7900       9.5       106       874        97
VIS    2025250    183200   22.5200  149.7500       8.8       102       866        96
VIS    2025250    183200   22.5100  149.1900       8.6        93       995        98
VIS    2025250    183200   22.5200  148.3800       9.2        89       993        98
VIS    2025250    183200   22.5000  148.3400       9.5        91       957        99
VIS    2025250    183200   22.5000  148.3100       9.6        90       925        99
VIS    2025250    183200   22.5100  148.2800       9.3        88       925        95
VIS    2025250    183200   22.5200  148.2300       9.5        83       914        96
VIS    2025250    183200   22.5100  148.2200       9.7        82       934        97
VIS    2025250    183200   22.5200  148.1900       9.3        83       804        90
VIS    2025250    183200   22.5200  148.1700       9.2        84       802        90
VIS    2025250    183200   22.5200  148.1300       8.8        84       812        91
VIS    2025250    183200   22.5100  148.1200       8.7        84       844        92
VIS    2025250    183200   22.5100  148.0700       9.5        85       866        94
VIS    2025250    183200   22.5000  148.0700       9.6        85       859        94
VIS    2025250    183200   22.5100  148.0200       8.9        87       846        91
VIS    2025250    183200   22.5200  147.9600       9.5        89       860        91
VIS    2025250    183200   22.5200  147.9200       9.4        87       871        95
VIS    2025250    183200   22.5200  147.9100       9.5        86       878        96
VIS    2025250    183200   22.5100  147.8800       9.9        83       883        95
VIS    2025250    183200   22.5100  147.8500      10.6        85       914        96
VIS    2025250    183200   22.5000  147.8400      10.4        87       922        96
VIS    2025250    183200   22.5200  147.8000      11.2        82       933        94
VIS    2025250    183200   22.5100  147.7000       9.4        78       989        94
VIS    2025250    183200   22.5100  147.6900       9.5        82       989        97
VIS    2025250    183200   22.4900  147.6400      10.7        88       970        99
VIS    2025250    183200   22.4900  147.6200      10.8        89       927        99
VIS    2025250    183200   22.5000  147.5900      10.6        92       919        95
VIS    2025250    183200   22.5000  147.5800      10.3        91       902        95
VIS    2025250    183200   22.5000  147.4900       9.0        85       834        91
VIS    2025250    183200   22.5100  147.4800       9.1        85       834        90
VIS    2025250    183200   22.4900  147.4400       8.8        88       837        92
VIS    2025250    183200   22.5000  147.4200       8.5        87       837        92
VIS    2025250    183200   22.4900  147.4100       8.2        84       837        92
VIS    2025250    183200   22.5000  147.3800       8.2        82       840        92
VIS    2025250    183200   22.5100  147.3600       8.5        82       843        91
VIS    2025250    183200   22.4800  146.5200       9.7       110       774        90
VIS    2025250    183200   22.4800  146.5100       9.8       109       774        90
VIS    2025250    183200   22.5000  146.4900       9.7       107       761        92
VIS    2025250    183200   22.4800  146.3200      10.8        86       829        90
VIS    2025250    183200   22.4900  146.2600      11.3        77       913        92
VIS    2025250    183200   22.4900  146.2300      12.1        79       947        97
VIS    2025250    183200   22.4800  146.2100      12.9        80       973        99
VIS    2025250    183200   22.4800  146.1800      13.2        79       974        97
VIS    2025250    183200   22.4800  145.7700      12.0        88       982        98
VIS    2025250    183200   22.4700  145.7400      11.1        93       990        97
VIS    2025250    183200   22.4700  145.7100      10.6        92       990        93
VIS    2025250    183200   22.4800  145.6900      10.0        91       966        91
VIS    2025250    183200   22.4800  145.6800      10.1        91       966        93
VIS    2025250    183200   22.4900  145.6400      11.0        89       966        95
VIS    2025250    183200   22.4900  145.6200      11.8        87       958        98
VIS    2025250    183200   22.4700  145.6000      12.8        85       958        97
VIS    2025250    183200   22.4800  145.5800      12.6        85       980        99
VIS    2025250    183200   22.4800  145.5500      10.6        82       980        95
VIS    2025250    183200   22.4600  144.8500      14.7        88       993        97
VIS    2025250    183200   22.4700  144.8400      14.4        88       998        98
VIS    2025250    183200   22.4600  144.8100      14.0        91       993        98
VIS    2025250    183200   22.4700  144.7800      14.1        94       984        95
VIS    2025250    183200   22.4800  144.0200      13.0        98       998        97
VIS    2025250    183200   22.4600  144.0100      13.0        96       989        96
VIS    2025250    183200   22.4500  143.7700      11.7        93       993        99
VIS    2025250    183200   22.4500  143.7400      10.8        93       958        99
VIS    2025250    183200   22.4500  143.7300      10.3        94       949        99
VIS    2025250    183200   22.4500  143.7000       9.6        97       944        97
VIS    2025250    183200   22.4500  143.6800      10.6        97       921        93
VIS    2025250    183200   22.4500  143.6400      11.8        96       916        97
VIS    2025250    183200   22.4700  143.6200      11.8        97       919        95
VIS    2025250    183200   22.4700  143.5900      11.6        95       924        95
VIS    2025250    183200   22.4500  143.5600      11.5        95       919        97
VIS    2025250    183200   22.4700  143.5600      11.3        94       953        95
VIS    2025250    183200   22.4500  143.5400      11.3        95       915        92
VIS    2025250    183200   22.4700  143.5100      11.0        91       917        97
VIS    2025250    183200   22.4600  143.4700      11.1        91       914        99
VIS    2025250    183200   22.4600  143.4600      11.0        91       914        99
VIS    2025250    183200   22.4700  143.4400      10.3        91       917        96
VIS    2025250    183200   22.4700  143.4100      10.5       100       916        90
VIS    2025250    183200   22.4700  143.3600      10.1        92       953        98
VIS    2025250    183200   22.4600  143.3300      10.6        88       957       100
VIS    2025250    183200   22.4500  143.3100      10.9        90       956        98
VIS    2025250    183200   22.4700  143.2900      11.0        90       943        97
VIS    2025250    183200   22.4500  143.1800      10.7        96       983        90
VIS    2025250    183200   22.4500  143.1500      10.7        88       994        99
VIS    2025250    183200   22.4500  143.1400      10.7        87       988        99
VIS    2025250    183200   22.4700  142.7900      11.9        93       957        94
VIS    2025250    183200   22.4700  142.7800      12.0        93       957        96
VIS    2025250    183200   22.4600  142.7400      11.5        94       919        98
VIS    2025250    183200   22.4600  142.6100      11.2        87       951        92
VIS    2025250    183200   22.4400  142.6000      11.4        85       933        95
VIS    2025250    183200   22.4600  142.5600      10.8        84       921        96
VIS    2025250    183200   22.4600  142.5400      10.4        84       922        96
VIS    2025250    183200   22.4500  142.5100      10.3        82       929        95
VIS    2025250    183200   22.5200  151.1300       7.0        80       947        94
VIS    2025250    183200   22.5300  151.1100       6.9        82       933        93
VIS    2025250    183200   22.5000  149.8000       8.7       102       899        99
VIS    2025250    183200   22.5100  149.7900       9.3       104       884        98
VIS    2025250    183200   22.5200  149.7700       9.3       103       872        97
VIS    2025250    183200   22.5200  149.6000       6.9        86       861        92
VIS    2025250    183200   22.5100  149.2000       8.6        92       995        98
VIS    2025250    183200   22.5100  149.1900       8.7        91       995        98
VIS    2025250    183200   22.4800  148.8300       9.1        85       985        96
VIS    2025250    183200   22.4800  148.8100       9.3        87       985        96
VIS    2025250    183200   22.4800  148.7800       9.0        87       952        97
VIS    2025250    183200   22.4800  148.7500       8.8        83       952        99
VIS    2025250    183200   22.4800  148.7300       8.7        83       959        99
VIS    2025250    183200   22.5000  148.7200       9.0        84       973        98
VIS    2025250    183200   22.4800  148.6500       8.5        86       976        99
VIS    2025250    183200   22.4800  148.3900       9.3        89       998        96
VIS    2025250    183200   22.4900  148.3700       9.5        91       983       100
VIS    2025250    183200   22.4800  148.3400       9.5        91       957        99
VIS    2025250    183200   22.4800  148.3100       9.2        90       908        97
VIS    2025250    183200   22.4900  148.2900       9.2        88       925        96
VIS    2025250    183200   22.5000  148.2800       9.2        88       925        94
VIS    2025250    183200   22.4800  148.2500       8.9        88       970        97
VIS    2025250    183200   22.5000  148.2200       9.8        82       969        97
VIS    2025250    183200   22.4900  148.1400       9.1        84       881        93
VIS    2025250    183200   22.4800  148.1100       9.2        84       929        99
VIS    2025250    183200   22.4700  148.1000       9.3        84       916        99
VIS    2025250    183200   22.4900  148.0600       9.7        85       846        93
VIS    2025250    183200   22.4700  147.9700      10.1        85       933        98
VIS    2025250    183200   22.4700  147.9300       9.4        90       871        98
VIS    2025250    183200   22.4800  147.9200       9.2        89       871        98
VIS    2025250    183200   22.4900  147.8800       9.8        84       878        95
VIS    2025250    183200   22.4900  147.8500      10.2        85       901        95
VIS    2025250    183200   22.4800  147.8300       9.7        86       940        98
VIS    2025250    183200   22.4700  147.6700       9.3        89       970        98
VIS    2025250    183200   22.4800  147.6500      10.4        88       970        99
VIS    2025250    183200   22.4800  147.6200      10.7        87       922        99
VIS    2025250    183200   22.4700  147.6200      10.4        87       922        98
VIS    2025250    183200   22.4800  147.5800      10.1        89       896        92
VIS    2025250    183200   22.4700  147.5400       9.2        86       835        91
VIS    2025250    183200   22.4800  147.5000       8.8        86       838        92
VIS    2025250    183200   22.4700  147.4800       8.5        87       838        93
VIS    2025250    183200   22.4700  147.4600       8.4        86       839        93
VIS    2025250    183200   22.4800  147.4400       8.8        88       838        92
VIS    2025250    183200   22.4800  147.4200       8.6        87       837        93
VIS    2025250    183200   22.4800  147.3700       8.1        82       843        92
VIS    2025250    183200   22.4800  147.3400       8.2        81       902        97
VIS    2025250    183200   22.4500  146.5300       9.5       109       791        93
VIS    2025250    183200   22.4600  146.5200       9.6       109       791        93
VIS    2025250    183200   22.4600  146.4900      10.3       108       791        92
VIS    2025250    183200   22.4700  146.4700      10.2       108       788        91
VIS    2025250    183200   22.4700  146.4400       8.9       117       737        90
VIS    2025250    183200   22.4600  146.3600       9.3       103       812        92
VIS    2025250    183200   22.4600  146.3500       9.7        94       813        94
VIS    2025250    183200   22.4500  146.3000       9.9        89       842        93
VIS    2025250    183200   22.4600  146.2300      12.2        85       896        94
VIS    2025250    183200   22.4500  146.2000      12.3        83       944        97
VIS    2025250    183200   22.4600  146.1900      12.3        82       944        96
VIS    2025250    183200   22.4500  146.1700      11.9        82       953        96
VIS    2025250    183200   22.4500  146.1400      12.0        84       953        99
VIS    2025250    183200   22.4500  145.7700      12.0        92       982        95
VIS    2025250    183200   22.4600  145.7300      11.6        95       982        98
VIS    2025250    183200   22.4600  145.7300      11.5        95       982        97
VIS    2025250    183200   22.4500  145.6900      11.7        90       936        98
VIS    2025250    183200   22.4400  145.6600      12.0        87       924        98
VIS    2025250    183200   22.4500  145.6400      12.2        87       922        98
VIS    2025250    183200   22.4600  145.6300      12.1        86       924        97
VIS    2025250    183200   22.4600  145.5900      13.0        86       935        98
VIS    2025250    183200   22.4400  144.8600      15.3        89       992        95
VIS    2025250    183200   22.4400  144.8300      15.0        91       992        96
VIS    2025250    183200   22.4400  144.8200      14.7        92       987        96
VIS    2025250    183200   22.4500  144.7900      13.8        94       984        96
VIS    2025250    183200   22.4400  144.4600      12.1        93       991        98
VIS    2025250    183200   22.4400  144.1700      13.4        96       977        93
VIS    2025250    183200   22.4300  144.0300      12.3       104       972        93
VIS    2025250    183200   22.4300  144.0100      12.4        99       965        94
VIS    2025250    183200   22.4400  143.9800      12.4        93       972        98
VIS    2025250    183200   22.4500  143.9600      12.0        93       977        99
VIS    2025250    183200   22.4300  143.9400      13.0        94       991        97
VIS    2025250    183200   22.4300  143.8000      14.1        89       993        96
VIS    2025250    183200   22.4300  143.7900      13.7        91       976        97
VIS    2025250    183200   22.4500  143.7500      11.7        92       965        99
VIS    2025250    183200   22.4400  143.7400      11.8        90       949        99
VIS    2025250    183200   22.4400  143.7100      10.4        93       943        98
VIS    2025250    183200   22.4300  143.6700      12.7        90       919        94
VIS    2025250    183200   22.4400  143.6500      12.4        93       918        97
VIS    2025250    183200   22.4400  143.6400      12.2        94       918        97
VIS    2025250    183200   22.4300  143.6000      11.9        95       917        98
VIS    2025250    183200   22.4300  143.5800      11.9        96       918        98
VIS    2025250    183200   22.4400  143.5600      11.6        97       918        96
VIS    2025250    183200   22.4500  143.5400      11.3        96       916        95
VIS    2025250    183200   22.4300  143.5100      11.6        95       915        97
VIS    2025250    183200   22.4400  143.4900      11.4        93       914        99
VIS    2025250    183200   22.4500  143.4500      11.1        92       914        99
VIS    2025250    183200   22.4200  143.4400      11.6        95       914        98
VIS    2025250    183200   22.4300  143.4000      10.8        97       914        98
VIS    2025250    183200   22.4200  143.3800      10.5        96       914        99
VIS    2025250    183200   22.4400  143.3500       9.8        91       921        97
VIS    2025250    183200   22.4400  143.3200      10.6        90       956        99
VIS    2025250    183200   22.4200  143.3000      10.2        93       943        97
VIS    2025250    183200   22.4300  143.2700      10.3        90       943        99
VIS    2025250    183200   22.4300  143.2600       9.8        89       943        97
VIS    2025250    183200   22.4300  143.2400       9.7        89       945        95
VIS    2025250    183200   22.4300  143.1900      10.9        93       983        96
VIS    2025250    183200   22.4200  143.1500      10.9        86       988        99
VIS    2025250    183200   22.4300  143.1300      11.1        85       961        98
VIS    2025250    183200   22.4200  143.1100      11.3        85       958        99
VIS    2025250    183200   22.4400  142.8500      15.9        88       998        90
VIS    2025250    183200   22.4300  142.8100      10.6        95       979        98
VIS    2025250    183200   22.4300  142.7900      10.4        94       966        97
VIS    2025250    183200   22.4200  142.7400      11.0        93       923        94
VIS    2025250    183200   22.4200  142.7200      10.6        92       931        92
VIS    2025250    183200   22.4300  142.6200      11.8        89       933        93
VIS    2025250    183200   22.4400  142.6000      11.4        85       933        95
VIS    2025250    183200   22.4300  142.5800      10.9        87       932        97
VIS    2025250    183200   22.4400  142.5500      10.4        89       922        94
VIS    2025250    183200   22.5000  151.1700       7.7        80       966        92
VIS    2025250    183200   22.5100  151.1400       7.4        83       959        94
VIS    2025250    183200   22.4900  151.1300       6.9        86       946        96
VIS    2025250    183200   22.5100  151.0700       4.7        92       859        91
VIS    2025250    183200   22.4700  149.8100       8.2       104       940        92
VIS    2025250    183200   22.4700  149.7800       8.7        98       887        98
VIS    2025250    183200   22.4900  149.7500       9.3        98       867        96
VIS    2025250    183200   22.4900  149.6800       7.8        99       863        93
VIS    2025250    183200   22.4900  149.6300       7.6        91       915        96
VIS    2025250    183200   22.4600  149.2100       8.5        92       970        98
VIS    2025250    183200   22.4700  149.2100       8.5        93       970        99
VIS    2025250    183200   22.4600  149.1800       8.6        91       970        97
VIS    2025250    183200   22.4600  149.1600       8.7        89       948        98
VIS    2025250    183200   22.4700  148.8700       8.4        83       971        90
VIS    2025250    183200   22.4600  148.8400       8.9        88       971        97
VIS    2025250    183200   22.4600  148.8000       9.3        90       955        96
VIS    2025250    183200   22.4700  148.7900       9.2        89       952        97
VIS    2025250    183200   22.4700  148.7500       8.8        85       952        96
VIS    2025250    183200   22.4800  148.7300       8.6        83       952        99
VIS    2025250    183200   22.4700  148.7100       8.6        85       959        99
VIS    2025250    183200   22.4600  148.6900       8.3        88       943        98
VIS    2025250    183200   22.4700  148.3900       9.2        90       998        93
VIS    2025250    183200   22.4500  148.3600       9.6        90       949        98
VIS    2025250    183200   22.4500  148.3600       9.6        90       949        98
VIS    2025250    183200   22.4500  148.3100       9.1        91       897        94
VIS    2025250    183200   22.4600  148.3100       9.0        91       902        94
VIS    2025250    183200   22.4700  148.2700       8.8        88       949        93
VIS    2025250    183200   22.4600  148.2600       8.8        88       949        97
VIS    2025250    183200   22.4500  148.2300       9.1        87       968        98
VIS    2025250    183200   22.4600  148.2000       9.4        84       969        99
VIS    2025250    183200   22.4700  148.1500       9.1        83       968        93
VIS    2025250    183200   22.4600  148.1200       9.4        84       966        99
VIS    2025250    183200   22.4600  148.0900       9.5        84       907        98
VIS    2025250    183200   22.4600  148.0800       9.6        84       879        96
VIS    2025250    183200   22.4600  148.0300       9.6        88       869        90
VIS    2025250    183200   22.4600  147.9800       9.5        85       941        96
VIS    2025250    183200   22.4500  147.9600       9.5        85       911        97
VIS    2025250    183200   22.4600  147.9500       9.9        87       901        97
VIS    2025250    183200   22.4600  147.9100       9.1        90       878        97
VIS    2025250    183200   22.4500  147.8900       9.1        90       865        97
VIS    2025250    183200   22.4600  147.8700       9.3        89       865        97
VIS    2025250    183200   22.4600  147.8300       9.4        83       929        98
VIS    2025250    183200   22.4400  147.7000       9.3        78       979        99
VIS    2025250    183200   22.4400  147.6800       9.6        82       970        99
VIS    2025250    183200   22.4600  147.6500       9.7        89       937        98
VIS    2025250    183200   22.4400  147.6300       9.8        86       930        97
VIS    2025250    183200   22.4400  147.6100       9.3        84       916        93
VIS    2025250    183200   22.4600  147.6000       9.8        85       899        94
VIS    2025250    183200   22.4500  147.5300       9.1        86       835        91
VIS    2025250    183200   22.4500  147.5200       8.9        86       835        90
VIS    2025250    183200   22.4500  147.4900       8.5        87       839        91
VIS    2025250    183200   22.4600  147.4600       8.3        86       839        93
VIS    2025250    183200   22.4600  147.4300       8.4        88       840        94
VIS    2025250    183200   22.4400  146.5100      10.1       113       791        91
VIS    2025250    183200   22.4500  146.5000      10.6       111       791        91
VIS    2025250    183200   22.4300  146.4400       9.4       112       755        94
VIS    2025250    183200   22.4300  146.4200       9.4       113       762        94
VIS    2025250    183200   22.4300  146.3900       9.5       104       791        97
VIS    2025250    183200   22.4500  146.3500       9.5       100       812        96
VIS    2025250    183200   22.4300  146.3300       9.2        87       840        92
VIS    2025250    183200   22.4300  146.3100       9.5        88       852        93
VIS    2025250    183200   22.4300  146.2800      10.4        91       900        92
VIS    2025250    183200   22.4300  146.2300      12.0        89       908        95
VIS    2025250    183200   22.4300  146.2000      11.9        86       931        97
VIS    2025250    183200   22.4400  146.2000      12.1        85       933        97
VIS    2025250    183200   22.4400  146.1600      11.6        82       953        96
VIS    2025250    183200   22.4400  146.1500      11.6        84       953        99
VIS    2025250    183200   22.4200  145.7600      12.1        91       977        97
VIS    2025250    183200   22.4300  145.7400      12.2        93       959        97
VIS    2025250    183200   22.4200  145.7200      12.6        91       945        98
VIS    2025250    183200   22.4300  145.6800      12.6        87       924        99
VIS    2025250    183200   22.4200  145.6700      12.9        86       920        96
VIS    2025250    183200   22.4400  145.6400      12.8        87       920        99
VIS    2025250    183200   22.4200  145.6200      13.4        86       921        99
VIS    2025250    183200   22.4200  145.6000      12.7        85       923       100
VIS    2025250    183200   22.4400  145.5500      12.2        88       935        96
VIS    2025250    183200   22.4300  145.5300      12.5        88       946        96
VIS    2025250    183200   22.4100  145.2500      13.0        77       983        95
VIS    2025250    183200   22.4200  144.8500      15.4        92       992        95
VIS    2025250    183200   22.4200  144.8300      15.2        93       964        94
VIS    2025250    183200   22.4300  144.7900      13.7        94       960        96
VIS    2025250    183200   22.4200  144.7700      13.2        94       957        97
VIS    2025250    183200   22.4100  144.6500      14.0        85       999        97
VIS    2025250    183200   22.4100  144.6300      14.3        86       994        96
VIS    2025250    183200   22.4100  144.6000      14.5        89       994        95
VIS    2025250    183200   22.4100  144.4900      12.7        92       991        96
VIS    2025250    183200   22.4100  144.4600      11.6        94       987        98
VIS    2025250    183200   22.4100  144.4600      11.6        94       987        98
VIS    2025250    183200   22.4100  144.4300      11.4        92       965        98
VIS    2025250    183200   22.4100  144.4000      12.1        92       957        98
VIS    2025250    183200   22.4100  144.3700      12.2        93       965        95
VIS    2025250    183200   22.4100  144.2900      12.2        88       944        98
VIS    2025250    183200   22.4100  144.2500      10.5        92       971        94
VIS    2025250    183200   22.4100  144.2300      10.7        96       969        92
VIS    2025250    183200   22.4100  144.1900      11.9        95       969        93
VIS    2025250    183200   22.4100  144.1800      11.9        94       969        93
VIS    2025250    183200   22.4100  144.1500      11.6        96       969        95
VIS    2025250    183200   22.4100  144.1300      11.4        96       969        97
VIS    2025250    183200   22.4000  144.0900      12.0        98       977        97
VIS    2025250    183200   22.4000  144.0800      11.7       104       967        94
VIS    2025250    183200   22.4100  144.0400      11.5       109       960        93
VIS    2025250    183200   22.4200  144.0300      12.0       107       960        93
VIS    2025250    183200   22.4000  143.9900      12.2        91       943        99
VIS    2025250    183200   22.4000  143.9800      12.2        93       949        98
VIS    2025250    183200   22.4000  143.9500      12.9        99       960        96
VIS    2025250    183200   22.4000  143.9300      13.0       100       991        94
VIS    2025250    183200   22.4200  143.8900      12.0        98       995        91
VIS    2025250    183200   22.4200  143.8600      12.1        93       995        98
VIS    2025250    183200   22.4000  143.8500      12.7        90       976        97
VIS    2025250    183200   22.4200  143.8200      14.1        88       991        96
VIS    2025250    183200   22.4000  143.7900      13.6        93       952        96
VIS    2025250    183200   22.4200  143.7700      12.9        94       952        97
VIS    2025250    183200   22.4200  143.7500      12.6        93       949        97
VIS    2025250    183200   22.4200  143.7200      11.7        91       921        98
VIS    2025250    183200   22.4200  143.7000      11.9        91       920        97
VIS    2025250    183200   22.4000  143.6700      13.6        90       919        94
VIS    2025250    183200   22.4100  143.6600      13.8        90       918        95
VIS    2025250    183200   22.4000  143.6300      13.8        93       917        96
VIS    2025250    183200   22.4200  143.6000      12.1        95       917        98
VIS    2025250    183200   22.4200  143.5700      12.2        95       917        98
VIS    2025250    183200   22.4100  143.5500      12.4        97       916        96
VIS    2025250    183200   22.4000  143.5100      12.2        98       915        97
VIS    2025250    183200   22.4200  143.5000      12.0        95       915        97
VIS    2025250    183200   22.4200  143.4800      12.1        94       915        97
VIS    2025250    183200   22.4000  143.4400      12.0        96       915        97
VIS    2025250    183200   22.4000  143.4200      11.8        96       915        96
VIS    2025250    183200   22.4100  143.4100      11.8        94       915        95
VIS    2025250    183200   22.4000  143.3800      11.4        93       915        98
VIS    2025250    183200   22.4000  143.3400      10.3        96       920        93
VIS    2025250    183200   22.4000  143.3300      10.2        96       921        91
VIS    2025250    183200   22.4100  143.2900       9.9        94       925        92
VIS    2025250    183200   22.4200  143.2700       9.8        90       928        94
VIS    2025250    183200   22.4100  143.2600       9.7        89       925        91
VIS    2025250    183200   22.4200  143.2300      10.0        86       956        95
VIS    2025250    183200   22.4100  143.1900      10.3        80       969        96
VIS    2025250    183200   22.4100  143.1600      11.0        84       980        99
VIS    2025250    183200   22.4100  143.1600      11.0        84       988        99
VIS    2025250    183200   22.4200  143.1200      11.2        86       955        98
VIS    2025250    183200   22.4200  143.1100      11.1        85       955        99
VIS    2025250    183200   22.4000  142.9000      11.0        84       974        99
VIS    2025250    183200   22.4100  142.8500      12.9        84       988        92
VIS    2025250    183200   22.4000  142.8100      11.6        92       978        99
VIS    2025250    183200   22.4000  142.7800      11.1        90       932       100
VIS    2025250    183200   22.4100  142.7300      10.9        93       931        93
VIS    2025250    183200   22.4000  142.6600      11.6        98       936        95
VIS    2025250    183200   22.4100  142.6600      11.8       102       951        90
VIS    2025250    183200   22.4100  142.6200      12.5        85       928        96
VIS    2025250    183200   22.4000  142.6000      11.6        85       928        95
VIS    2025250    183200   22.4100  142.5700      11.1        86       928        96
VIS    2025250    183200   22.4100  142.5500      10.9        88       922        92
VIS    2025250    183200   22.4800  151.5000       7.3        83       979        90
VIS    2025250    183200   22.4900  151.1700       7.5        80       966        93
VIS    2025250    183200   22.4900  151.1500       7.1        87       955        96
VIS    2025250    183200   22.4800  151.1300       6.9        87       925        95
VIS    2025250    183200   22.4900  151.1000       6.6        87       872        90
VIS    2025250    183200   22.4500  149.7900       8.3       103       903       100
VIS    2025250    183200   22.4500  149.7800       8.3       101       903       100
VIS    2025250    183200   22.4600  149.7600       9.1        94       874        96
VIS    2025250    183200   22.4600  149.6900       7.6        95       863        97
VIS    2025250    183200   22.4400  149.2400       8.4        88       970        98
VIS    2025250    183200   22.4600  149.2100       8.5        91       970        99
VIS    2025250    183200   22.4600  149.2000       8.5        92       970        98
VIS    2025250    183200   22.4400  149.1700       8.5        89       927        98
VIS    2025250    183200   22.4600  149.1500       8.6        88       935        98
VIS    2025250    183200   22.4500  148.9400       9.2        84       946        95
VIS    2025250    183200   22.4300  148.8800       8.9        84       961        92
VIS    2025250    183200   22.4400  148.8700       8.6        85       971        94
VIS    2025250    183200   22.4500  148.8300       9.0        88       971        97
VIS    2025250    183200   22.4500  148.8000       9.3        89       911        95
VIS    2025250    183200   22.4500  148.7900       9.2        89       900        93
VIS    2025250    183200   22.4500  148.7500       8.8        88       887        92
VIS    2025250    183200   22.4500  148.7300       8.3        87       907        95
VIS    2025250    183200   22.4500  148.7100       8.3        88       919        96
VIS    2025250    183200   22.4500  148.6800       8.2        89       943        98
VIS    2025250    183200   22.4500  148.6600       8.4        89       943        99
VIS    2025250    183200   22.4300  148.3700       9.9        92       942        97
VIS    2025250    183200   22.4400  148.3500       9.6        90       926        98
VIS    2025250    183200   22.4300  148.3200       9.2        90       892        94
VIS    2025250    183200   22.4400  148.3200       9.1        91       893        95
VIS    2025250    183200   22.4300  148.2500       9.1        88       886        91
VIS    2025250    183200   22.4400  148.2200       9.1        88       917        96
VIS    2025250    183200   22.4400  148.2000       9.3        84       968        96
VIS    2025250    183200   22.4400  148.1200       9.3        85       968        99
VIS    2025250    183200   22.4400  148.0900       9.5        85       948        99
VIS    2025250    183200   22.4300  148.0700       9.2        86       907        98
VIS    2025250    183200   22.4200  148.0600       9.2        86       907        97
VIS    2025250    183200   22.4300  148.0300       9.7        87       914        95
VIS    2025250    183200   22.4200  148.0000       9.4        87       918        99
VIS    2025250    183200   22.4400  147.9600       9.3        85       927        97
VIS    2025250    183200   22.4400  147.9600       9.4        84       916        97
VIS    2025250    183200   22.4300  147.9100       9.1        85       873        96
VIS    2025250    183200   22.4200  147.9000       9.3        87       873        97
VIS    2025250    183200   22.4200  147.8800       9.3        91       865        97
VIS    2025250    183200   22.4400  147.8500       9.4        89       878        97
VIS    2025250    183200   22.4400  147.8300       9.1        83       929        98
VIS    2025250    183200   22.4400  147.7600       8.2        87       967        94
VIS    2025250    183200   22.4200  147.7100       9.0        79       985        98
VIS    2025250    183200   22.4300  147.6800       9.9        79       960        98
VIS    2025250    183200   22.4200  147.6800      10.1        80       944        99
VIS    2025250    183200   22.4200  147.6400      10.4        81       930        98
VIS    2025250    183200   22.4300  147.6100       9.4        83       916        95
VIS    2025250    183200   22.4200  147.6000       9.3        83       880        93
VIS    2025250    183200   22.4400  147.5000       8.8        86       840        90
VIS    2025250    183200   22.4200  146.4500      10.1       106       762        92
VIS    2025250    183200   22.4200  146.4100       9.2       109       766        94
VIS    2025250    183200   22.4100  146.3800       9.8        90       840        94
VIS    2025250    183200   22.4200  146.3500       9.4        86       840        92
VIS    2025250    183200   22.4000  146.3500      10.0        85       849        91
VIS    2025250    183200   22.4200  146.3000       9.9        89       877        94
VIS    2025250    183200   22.4200  146.2900      10.8        92       900        96
VIS    2025250    183200   22.4200  146.2500      11.3        91       908        93
VIS    2025250    183200   22.4200  146.2400      11.5        90       905        93
VIS    2025250    183200   22.4200  146.2100      11.8        88       912        96
VIS    2025250    183200   22.4200  146.2000      11.4        88       914        96
VIS    2025250    183200   22.4000  146.1600      10.7        90       914        95
VIS    2025250    183200   22.4100  146.1500      10.5        88       946        95
VIS    2025250    183200   22.4200  146.1000      10.4        82       988        98
VIS    2025250    183200   22.4000  146.0800       9.8        88       964        97
VIS    2025250    183200   22.4000  146.0300      10.7        91       999        91
VIS    2025250    183200   22.3900  145.7900      13.0        89       977        99
VIS    2025250    183200   22.4000  145.7800      12.5        90       981        98
VIS    2025250    183200   22.4100  145.7400      12.3        91       953        97
VIS    2025250    183200   22.4100  145.7200      12.6        91       933        99
VIS    2025250    183200   22.4100  145.7100      12.8        90       933        99
VIS    2025250    183200   22.4100  145.6700      13.3        85       920        98
VIS    2025250    183200   22.4100  145.6600      13.5        85       920        98
VIS    2025250    183200   22.4100  145.6100      13.1        86       921        99
VIS    2025250    183200   22.4100  145.5900      12.4        85       923       100
VIS    2025250    183200   22.3900  145.5700      12.8        86       929        99
VIS    2025250    183200   22.4100  145.5600      12.1        88       931        98
VIS    2025250    183200   22.3900  145.5100      13.8        89       955        98
VIS    2025250    183200   22.4000  145.3300      11.0        90       979        94
VIS    2025250    183200   22.4000  145.2300      14.7        77       971        93
VIS    2025250    183200   22.3900  145.2000      16.3        80       962        93
VIS    2025250    183200   22.3900  145.2000      16.4        81       971        93
VIS    2025250    183200   22.3900  144.8800      14.6        91       990        97
VIS    2025250    183200   22.4000  144.8500      15.2        94       980        95
VIS    2025250    183200   22.3900  144.8300      14.7        95       949        95
VIS    2025250    183200   22.3900  144.8000      14.5        95       936        95
VIS    2025250    183200   22.4000  144.7900      13.9        92       939        96
VIS    2025250    183200   22.4100  144.7500      13.4        92       970        98
VIS    2025250    183200   22.4000  144.7200      14.4        95       990        95
VIS    2025250    183200   22.4000  144.7000      14.2        91       990        96
VIS    2025250    183200   22.3900  144.6800      13.5        84       973        98
VIS    2025250    183200   22.3900  144.6500      13.5        84       973        98
VIS    2025250    183200   22.4000  144.6400      13.8        84       993        98
VIS    2025250    183200   22.4000  144.5900      14.2        88       994        96
VIS    2025250    183200   22.3800  144.5700      13.8        87       960        98
VIS    2025250    183200   22.3900  144.5400      11.7        87       978        96
VIS    2025250    183200   22.3900  144.4900      12.5        90       953        96
VIS    2025250    183200   22.3900  144.4900      12.4        91       953        96
VIS    2025250    183200   22.3900  144.4400      11.6        92       957        96
VIS    2025250    183200   22.3900  144.4200      12.0        92       957        97
VIS    2025250    183200   22.4000  144.4000      12.2        92       957        96
VIS    2025250    183200   22.4000  144.3700      12.4        92       965        94
VIS    2025250    183200   22.3900  144.3400      13.0        91       965        90
VIS    2025250    183200   22.4000  144.2900      12.2        88       944        98
VIS    2025250    183200   22.3900  144.2900      11.9        87       939        97
VIS    2025250    183200   22.4000  144.2600      10.6        90       969        96
VIS    2025250    183200   22.3900  144.2200      11.0        96       964        92
VIS    2025250    183200   22.4000  144.1900      11.7        95       969        92
VIS    2025250    183200   22.4000  144.1700      12.0        95       969        94
VIS    2025250    183200   22.3800  144.1600      11.5        94       943        93
VIS    2025250    183200   22.3800  144.1200      11.5        98       961        96
VIS    2025250    183200   22.3900  144.1000      11.9        97       972        98
VIS    2025250    183200   22.4000  144.0800      11.9       101       967        96
VIS    2025250    183200   22.4000  144.0500      11.4       105       960        94
VIS    2025250    183200   22.3800  144.0200      11.1        94       939        96
VIS    2025250    183200   22.3800  144.0100      11.5        93       937        96
VIS    2025250    183200   22.4000  143.9800      12.2        94       943        97
VIS    2025250    183200   22.4000  143.9300      13.0       100       991        94
VIS    2025250    183200   22.4000  143.9000      13.0        96       976        92
VIS    2025250    183200   22.3800  143.8700      13.4        92       952        94
VIS    2025250    183200   22.4000  143.8300      13.5        89       970        94
VIS    2025250    183200   22.4000  143.8000      13.6        90       964        97
VIS    2025250    183200   22.3800  143.7900      13.1        96       920        94
VIS    2025250    183200   22.3900  143.7400      13.7        98       918        94
VIS    2025250    183200   22.3900  143.7200      13.1        95       915        96
VIS    2025250    183200   22.3800  143.7100      12.9        95       914        96
VIS    2025250    183200   22.4000  143.6700      13.5        90       918        94
VIS    2025250    183200   22.3900  143.6500      13.9        91       917        96
VIS    2025250    183200   22.3800  143.6200      14.0        97       916        95
VIS    2025250    183200   22.4000  143.5900      13.8        95       917        94
VIS    2025250    183200   22.3800  143.5800      13.9        96       916        93
VIS    2025250    183200   22.3900  143.5400      12.4        97       915        96
VIS    2025250    183200   22.3900  143.5200      12.2        98       915        97
VIS    2025250    183200   22.3900  143.5100      12.3        97       915        97
VIS    2025250    183200   22.3700  143.4700      12.4        97       915        97
VIS    2025250    183200   22.3700  143.4400      11.4        99       915        97
VIS    2025250    183200   22.3700  143.4300      11.4        99       915        97
VIS    2025250    183200   22.3800  143.4000      11.8        94       916        93
VIS    2025250    183200   22.3800  143.3900      11.8        95       918        92
VIS    2025250    183200   22.3900  143.3600      10.8        94       920        94
VIS    2025250    183200   22.3800  143.3300       9.3        94       928        90
VIS    2025250    183200   22.3800  143.3100       9.5        93       925        92
VIS    2025250    183200   22.3900  143.2800       9.4        90       928        91
VIS    2025250    183200   22.3800  143.2400       9.6        88       928        93
VIS    2025250    183200   22.3800  143.2000       9.2        85       946        97
VIS    2025250    183200   22.3900  143.1800      10.2        81       969        97
VIS    2025250    183200   22.3900  143.1500      11.3        85       968        98
VIS    2025250    183200   22.3800  143.1400      11.1        86       961        97
VIS    2025250    183200   22.3700  142.9900      10.8        83       998        98
VIS    2025250    183200   22.3800  142.9900      10.9        82       998        98
VIS    2025250    183200   22.3800  142.9300       9.6        91       993        92
VIS    2025250    183200   22.3700  142.9000      11.1        87       927        99
VIS    2025250    183200   22.3700  142.8900      11.3        86       927       100
VIS    2025250    183200   22.3700  142.8600      12.6        87       963        98
VIS    2025250    183200   22.3700  142.8200      12.7        89       963        98
VIS    2025250    183200   22.3700  142.8000      12.5        89       948        99
VIS    2025250    183200   22.3700  142.7800      11.8        90       944        98
VIS    2025250    183200   22.3700  142.6700      10.8        99       915        96
VIS    2025250    183200   22.3800  142.6600      11.2        96       928        96
VIS    2025250    183200   22.3700  142.6300      10.6        89       951        97
VIS    2025250    183200   22.3800  142.5900      11.0        85       930        94
VIS    2025250    183200   22.3800  142.5900      11.0        84       930        94
VIS    2025250    183200   22.3800  142.5400      11.0        79       948        90
VIS    2025250    183200   22.4400  151.2200       5.2        90       985        97
VIS    2025250    183200   22.4400  151.2100       5.6        89       985        98
VIS    2025250    183200   22.4400  151.1700       5.6        90       965        96
VIS    2025250    183200   22.4400  151.1500       5.3        89       963        99
VIS    2025250    183200   22.4400  151.1300       5.1        86       888        99
VIS    2025250    183200   22.4600  151.1000       6.3        88       872        94
VIS    2025250    183200   22.4600  151.0800       4.5        89       858        95
VIS    2025250    183200   22.4300  149.9500       6.3       110       966        90
VIS    2025250    183200   22.4400  149.8000       8.4       102       940        91
VIS    2025250    183200   22.4400  149.7900       8.4       100       920        97
VIS    2025250    183200   22.4200  149.7600       8.0        93       899        97
VIS    2025250    183200   22.4200  149.7400       7.8        93       885        99
VIS    2025250    183200   22.4300  149.7000       7.7        91       901        97
VIS    2025250    183200   22.4300  149.6900       7.7        91       901        95
VIS    2025250    183200   22.4200  149.2300       8.2        86       962        97
VIS    2025250    183200   22.4100  149.2200       8.2        85       960        97
VIS    2025250    183200   22.4100  149.1800       8.4        87       895        95
VIS    2025250    183200   22.4100  149.1700       8.6        88       888        96
VIS    2025250    183200   22.4200  149.1400       8.6        88       895        95
VIS    2025250    183200   22.4100  148.9700       9.4        85       957        95
VIS    2025250    183200   22.4100  148.9500       8.6        80       957        95
VIS    2025250    183200   22.4200  148.9200       8.5        80       961        95
VIS    2025250    183200   22.4100  148.9000       9.1        84       961        93
VIS    2025250    183200   22.4100  148.8800       9.3        85       939        91
VIS    2025250    183200   22.4100  148.8600       8.9        85       925        93
VIS    2025250    183200   22.4100  148.8200       8.8        85       900        93
VIS    2025250    183200   22.4200  148.8100       9.3        88       900        91
VIS    2025250    183200   22.4100  148.7400       9.0        85       877        95
VIS    2025250    183200   22.4100  148.7300       8.8        87       877        96
VIS    2025250    183200   22.4200  148.6900       8.2        93       907        95
VIS    2025250    183200   22.4200  148.6800       8.3        92       919        95
VIS    2025250    183200   22.4100  148.6600       9.0        91       939        95
VIS    2025250    183200   22.4100  148.6100      10.1        86       964        98
VIS    2025250    183200   22.4100  148.6100      10.1        85       970        98
VIS    2025250    183200   22.4000  148.5600      10.1        86       968        96
VIS    2025250    183200   22.4000  148.5600      10.0        87       968        96
VIS    2025250    183200   22.4000  148.4600      10.1        82       978        97
VIS    2025250    183200   22.4100  148.4200       9.2        87       996        99
VIS    2025250    183200   22.4000  148.3800      10.0        94       970        99
VIS    2025250    183200   22.4200  148.3600       9.9        91       912        97
VIS    2025250    183200   22.4100  148.3400       9.6        89       896        96
VIS    2025250    183200   22.4200  148.3200       9.3        89       892        95
VIS    2025250    183200   22.4000  148.3000       8.8        88       886        90
VIS    2025250    183200   22.4100  148.2600       9.3        89       886        91
VIS    2025250    183200   22.4200  148.2500       9.3        89       886        91
VIS    2025250    183200   22.4000  148.1800       9.3        83       892        92
VIS    2025250    183200   22.4000  148.1400       9.5        84       934        95
VIS    2025250    183200   22.4000  148.1000       9.4        88       953        99
VIS    2025250    183200   22.4100  148.0600       9.2        86       930        97
VIS    2025250    183200   22.4200  148.0500       9.3        86       908        95
VIS    2025250    183200   22.4000  148.0100       9.8        84       921        97
VIS    2025250    183200   22.4200  147.9900       9.4        86       920        98
VIS    2025250    183200   22.3900  147.9700       9.7        87       914        95
VIS    2025250    183200   22.4100  147.9400       8.9        85       894        96
VIS    2025250    183200   22.4000  147.9000       9.1        84       873        97
VIS    2025250    183200   22.4100  147.8800       9.3        90       873        97
VIS    2025250    183200   22.4100  147.8700       9.1        90       881        97
VIS    2025250    183200   22.4000  147.8300       7.9        85       912        96
VIS    2025250    183200   22.4000  147.8100       8.5        84       947        97
VIS    2025250    183200   22.4000  147.7900       9.1        85       951        97
VIS    2025250    183200   22.3900  147.7500       9.9        82       955        97
VIS    2025250    183200   22.3900  147.7400       9.8        81       953        96
VIS    2025250    183200   22.4000  147.7100       9.2        79       952        95
VIS    2025250    183200   22.4000  147.6800       9.9        79       936        96
VIS    2025250    183200   22.4100  147.6500      10.8        79       930        97
VIS    2025250    183200   22.4100  147.6300      10.3        80       929        96
VIS    2025250    183200   22.4000  147.6000       9.8        81       867        91
VIS    2025250    183200   22.3800  146.4600       9.5       116       787        91
VIS    2025250    183200   22.3900  146.4200       8.7        96       799        94
VIS    2025250    183200   22.3800  146.3900       9.5        89       845        93
VIS    2025250    183200   22.3800  146.3700      10.0        89       852        93
VIS    2025250    183200   22.4000  146.3500      10.2        85       860        93
VIS    2025250    183200   22.3900  146.3400      10.5        86       873        94
VIS    2025250    183200   22.4000  146.3100      10.8        88       866        91
VIS    2025250    183200   22.3900  146.2700      11.2        92       881        96
VIS    2025250    183200   22.3800  146.1900      11.5        91       881        97
VIS    2025250    183200   22.3900  146.1700      11.0        90       905        97
VIS    2025250    183200   22.3900  146.1500      10.5        89       930        93
VIS    2025250    183200   22.3900  146.1200       9.7        83       950        93
VIS    2025250    183200   22.3700  146.0900       9.5        88       947        95
VIS    2025250    183200   22.3900  146.0700       9.9        90       964        97
VIS    2025250    183200   22.3700  146.0500      10.6        95       964        96
VIS    2025250    183200   22.3900  145.8000      13.6        89       981        99
VIS    2025250    183200   22.3700  145.7900      13.5        88       977        99
VIS    2025250    183200   22.3800  145.7500      12.5        89       939        97
VIS    2025250    183200   22.3900  145.7400      12.4        90       939        97
VIS    2025250    183200   22.3800  145.6700      12.8        86       919        94
VIS    2025250    183200   22.3800  145.6600      12.7        84       919        97
VIS    2025250    183200   22.3900  145.6200      12.4        86       921        99
VIS    2025250    183200   22.3900  145.5900      12.2        85       923       100
VIS    2025250    183200   22.3700  145.5700      13.4        90       938        98
VIS    2025250    183200   22.3700  145.5600      13.4        90       940        99
VIS    2025250    183200   22.3900  145.5200      13.7        88       955        99
VIS    2025250    183200   22.3900  145.5100      13.8        87       971        98
VIS    2025250    183200   22.3600  145.3500      11.2        86       971        91
VIS    2025250    183200   22.3600  145.3300      12.4        83       970        93
VIS    2025250    183200   22.3800  145.2600      11.8        75       983        91
VIS    2025250    183200   22.3800  145.2300      15.3        77       962        93
VIS    2025250    183200   22.3600  145.2000      15.4        82       951        95
VIS    2025250    183200   22.3700  145.1800      15.3        85       971        96
VIS    2025250    183200   22.3600  145.0600      13.7        87       981        95
VIS    2025250    183200   22.3600  145.0500      13.8        87       968        97
VIS    2025250    183200   22.3700  145.0300      14.0        89       968        97
VIS    2025250    183200   22.3700  144.9800      14.2        92       975        98
VIS    2025250    183200   22.3700  144.9100      14.3        90       987        96
VIS    2025250    183200   22.3800  144.9100      14.5        88       990        96
VIS    2025250    183200   22.3800  144.8700      14.8        94       976        96
VIS    2025250    183200   22.3600  144.8500      14.8        93       947        96
VIS    2025250    183200   22.3800  144.8300      14.7        94       946        96
VIS    2025250    183200   22.3600  144.7900      14.3        96       932        95
VIS    2025250    183200   22.3700  144.7700      14.0        92       936        98
VIS    2025250    183200   22.3700  144.7400      14.2        91       960        96
VIS    2025250    183200   22.3600  144.7100      14.8        90       961        96
VIS    2025250    183200   22.3600  144.6800      14.1        86       961        97
VIS    2025250    183200   22.3600  144.6800      13.9        86       961        97
VIS    2025250    183200   22.3600  144.6400      13.4        82       935        97
VIS    2025250    183200   22.3600  144.6200      13.3        80       935        96
VIS    2025250    183200   22.3700  144.6000      13.8        82       950        95
VIS    2025250    183200   22.3700  144.5700      13.9        84       952        97
VIS    2025250    183200   22.3600  144.5500      12.7        85       952        99
VIS    2025250    183200   22.3600  144.5300      11.3        84       939        98
VIS    2025250    183200   22.3600  144.4900      12.5        88       931        95
VIS    2025250    183200   22.3800  144.4600      11.7        93       942        97
VIS    2025250    183200   22.3800  144.4500      11.6        93       942        95
VIS    2025250    183200   22.3800  144.4200      11.9        92       942        96
VIS    2025250    183200   22.3800  144.4100      12.2        92       957        96
VIS    2025250    183200   22.3600  144.3600      13.2        90       934        97
VIS    2025250    183200   22.3600  144.3500      13.1        90       936        97
VIS    2025250    183200   22.3800  144.3200      13.1        91       933        96
VIS    2025250    183200   22.3600  144.2800      11.7        88       933        96
VIS    2025250    183200   22.3500  144.2800      11.6        89       933        97
VIS    2025250    183200   22.3700  144.2300      11.3        96       957        95
VIS    2025250    183200   22.3600  144.2200      11.3        95       936        97
VIS    2025250    183200   22.3700  144.2000      11.1        94       933        96
VIS    2025250    183200   22.3700  144.1600      11.4        93       943        93
VIS    2025250    183200   22.3600  144.1400      11.4        94       941        94
VIS    2025250    183200   22.3700  144.1200      11.4        98       955        95
VIS    2025250    183200   22.3700  144.0900      12.0        97       941        98
VIS    2025250    183200   22.3600  144.0700      11.9        94       932        99
VIS    2025250    183200   22.3500  144.0500      11.5        94       932        99
VIS    2025250    183200   22.3700  144.0300      11.1        95       939        96
VIS    2025250    183200   22.3600  143.9800      11.4        97       916        97
VIS    2025250    183200   22.3700  143.9600      11.6       107       943        90
VIS    2025250    183200   22.3600  143.9500      11.7       108       957        92
VIS    2025250    183200   22.3500  143.9100      13.5        91       945        97
VIS    2025250    183200   22.3700  143.8800      13.9        87       952        97
VIS    2025250    183200   22.3600  143.8700      13.8        88       946        92
VIS    2025250    183200   22.3500  143.8200      13.4        90       922        96
VIS    2025250    183200   22.3700  143.8000      12.8        92       920        97
VIS    2025250    183200   22.3600  143.7600      14.7        95       917        91
VIS    2025250    183200   22.3500  143.7500      14.7        95       916        90
VIS    2025250    183200   22.3600  143.7200      13.3        95       914        93
VIS    2025250    183200   22.3500  143.6800      13.2        90       914        97
VIS    2025250    183200   22.3600  143.6800      13.4        90       914        97
VIS    2025250    183200   22.3500  143.6400      13.7        92       915        96
VIS    2025250    183200   22.3600  143.6100      14.0        97       916        95
VIS    2025250    183200   22.3500  143.6000      13.6        95       915        95
VIS    2025250    183200   22.3600  143.5700      13.9        96       915        91
VIS    2025250    183200   22.3500  143.5500      12.8        94       915        93
VIS    2025250    183200   22.3600  143.5100      12.3        94       915        98
VIS    2025250    183200   22.3600  143.4900      12.4        95       915        98
VIS    2025250    183200   22.3500  143.4600      11.7        99       915        97
VIS    2025250    183200   22.3500  143.4500      11.5       100       915        96
VIS    2025250    183200   22.3700  143.4300      11.3        99       915        97
VIS    2025250    183200   22.3700  143.4100      11.4        97       923        95
VIS    2025250    183200   22.3500  143.3600      10.4        91       927        93
VIS    2025250    183200   22.3500  143.3300       9.3        88       927        95
VIS    2025250    183200   22.3700  143.3300       9.0        92       928        92
VIS    2025250    183200   22.3500  143.2800       9.8        89       924        96
VIS    2025250    183200   22.3500  143.2700       9.4        91       925        96
VIS    2025250    183200   22.3600  143.2500       9.3        91       926        97
VIS    2025250    183200   22.3600  143.2300       9.2        91       926        97
VIS    2025250    183200   22.3500  143.2100       8.9        91       920        97
VIS    2025250    183200   22.3600  143.1600       9.8        85       928        97
VIS    2025250    183200   22.3700  143.1400      10.4        86       955        97
VIS    2025250    183200   22.3500  143.0100      10.6        83       998        97
VIS    2025250    183200   22.3600  142.9900      10.8        84       998        99
VIS    2025250    183200   22.3600  142.9800      10.8        84       993        99
VIS    2025250    183200   22.3600  142.9100      10.7        89       951        93
VIS    2025250    183200   22.3500  142.8800      11.5        88       921        95
VIS    2025250    183200   22.3500  142.8500      12.4        92       963        94
VIS    2025250    183200   22.3600  142.8100      12.7        88       963        99
VIS    2025250    183200   22.3500  142.7900      11.9        89       951        98
VIS    2025250    183200   22.3600  142.6400      10.7        90       951        99
VIS    2025250    183200   22.3400  142.4400      11.5        90       983        98
VIS    2025250    183200   22.3400  142.4300      11.2        90       983        98
VIS    2025250    183200   22.4400  151.2200       5.2        88       985        98
VIS    2025250    183200   22.4400  151.2000       5.6        90       985        98
VIS    2025250    183200   22.4200  151.1600       5.0        89       888        98
VIS    2025250    183200   22.4200  151.1600       4.9        90       888        99
VIS    2025250    183200   22.4300  151.1200       4.7        87       885        97
VIS    2025250    183200   22.4300  151.1100       4.6        88       884        97
VIS    2025250    183200   22.4000  149.9200       7.8       114       906        91
VIS    2025250    183200   22.4000  149.7800       8.7        92       920        95
VIS    2025250    183200   22.4100  149.7600       8.0        92       899        97
VIS    2025250    183200   22.4100  149.7500       7.9        93       899        99
VIS    2025250    183200   22.4000  149.7000       7.6        95       901        93
VIS    2025250    183200   22.4000  149.7000       7.7        94       904        93
VIS    2025250    183200   22.4100  149.2400       8.2        87       962        96
VIS    2025250    183200   22.4100  149.2300       8.1        87       960        98
VIS    2025250    183200   22.4000  149.2000       8.1        85       927        94
VIS    2025250    183200   22.4000  149.1800       8.4        87       888        94
VIS    2025250    183200   22.4100  149.1300       8.6        87       895        94
VIS    2025250    183200   22.3800  149.0900       8.1        84       978        96
VIS    2025250    183200   22.3800  149.0800       8.2        85       982        98
VIS    2025250    183200   22.3800  149.0500       8.5        83       977        96
VIS    2025250    183200   22.4000  149.0200       8.5        80       969        95
VIS    2025250    183200   22.3800  149.0000       9.0        83       969        95
VIS    2025250    183200   22.4000  148.9600       9.3        83       960        95
VIS    2025250    183200   22.3900  148.9400       8.4        79       957        94
VIS    2025250    183200   22.3800  148.9000       8.5        82       908        93
VIS    2025250    183200   22.3900  148.8900       9.0        84       908        93
VIS    2025250    183200   22.3900  148.8700       9.2        84       898        90
VIS    2025250    183200   22.4000  148.8300       8.4        83       900        91
VIS    2025250    183200   22.4000  148.8200       8.5        83       900        92
VIS    2025250    183200   22.3800  148.7700       9.0        85       874        92
VIS    2025250    183200   22.3800  148.7600       9.0        85       875        92
VIS    2025250    183200   22.3800  148.7300       9.2        84       877        95
VIS    2025250    183200   22.3800  148.7200       8.8        84       879        95
VIS    2025250    183200   22.3900  148.6700       8.7        90       884        92
VIS    2025250    183200   22.4000  148.6600       9.2        91       886        93
VIS    2025250    183200   22.3900  148.6300       9.7        88       907        94
VIS    2025250    183200   22.3800  148.6000      10.0        85       907        92
VIS    2025250    183200   22.3800  148.5800      10.2        86       911        92
VIS    2025250    183200   22.3900  148.5600      10.2        86       968        95
VIS    2025250    183200   22.3900  148.5100       9.9        83       991        91
VIS    2025250    183200   22.3800  148.4200       9.6        86       978        99
VIS    2025250    183200   22.3800  148.3900       9.8        92       970        98
VIS    2025250    183200   22.3800  148.3700      10.0        90       897        96
VIS    2025250    183200   22.3800  148.3400       9.6        86       892        94
VIS    2025250    183200   22.3800  148.3400       9.5        85       880        92
VIS    2025250    183200   22.3900  148.3100       8.9        87       882        90
VIS    2025250    183200   22.3900  148.2800       9.0        88       884        93
VIS    2025250    183200   22.3800  148.2500       9.0        88       819        92
VIS    2025250    183200   22.3800  148.2200       8.1        84       802        92
VIS    2025250    183200   22.3700  148.2000       8.1        83       802        91
VIS    2025250    183200   22.3700  148.1600       9.3        87       913        98
VIS    2025250    183200   22.3900  148.1400       9.5        86       934        98
VIS    2025250    183200   22.3700  148.1300       9.9        86       975        99
VIS    2025250    183200   22.3900  148.1000       9.5        87       944        99
VIS    2025250    183200   22.3800  148.0800       9.4        86       944        97
VIS    2025250    183200   22.3900  148.0500       9.4        84       939        92
VIS    2025250    183200   22.3700  148.0100       9.5        82       934        95
VIS    2025250    183200   22.3800  148.0000      10.0        83       921        95
VIS    2025250    183200   22.3800  147.9800       9.9        85       915        96
VIS    2025250    183200   22.3700  147.9500       9.5        86       906        98
VIS    2025250    183200   22.3700  147.9200       8.9        86       882        96
VIS    2025250    183200   22.3900  147.9000       9.1        85       875        97
VIS    2025250    183200   22.3700  147.8800       8.6        84       881        96
VIS    2025250    183200   22.3800  147.7800       9.4        84       955        93
VIS    2025250    183200   22.3800  147.7500       9.7        82       955        97
VIS    2025250    183200   22.3900  147.7100       9.3        80       936        94
VIS    2025250    183200   22.3900  147.6800       9.7        79       933        94
VIS    2025250    183200   22.3900  147.6700      10.0        79       926        95
VIS    2025250    183200   22.3600  147.6300       9.8        81       914        96
VIS    2025250    183200   22.3900  147.6000      10.1        81       899        95
VIS    2025250    183200   22.3700  147.5800      10.4        83       899        95
VIS    2025250    183200   22.3700  147.5600      10.1        82       938        96
VIS    2025250    183200   22.3700  147.5400       9.5        81       938        93
VIS    2025250    183200   22.3600  147.3200       7.1        78       985        94
VIS    2025250    183200   22.3700  147.2900       6.7        73       985        91
VIS    2025250    183200   22.3600  147.1500       7.9        86       967        91
VIS    2025250    183200   22.3600  146.4200       8.4        93       830        94
VIS    2025250    183200   22.3600  146.4000       9.0        89       845        93
VIS    2025250    183200   22.3500  146.3700      10.6        92       873        98
VIS    2025250    183200   22.3600  146.3500      11.1        90       891        98
VIS    2025250    183200   22.3600  146.3100      11.7        90       860        93
VIS    2025250    183200   22.3500  146.2800      11.3        90       853        90
VIS    2025250    183200   22.3600  146.2700      11.4        90       853        90
VIS    2025250    183200   22.3500  146.1800      10.9        86       890        97
VIS    2025250    183200   22.3500  146.1800      10.5        86       905        97
VIS    2025250    183200   22.3500  146.1300       9.5        84       914        97
VIS    2025250    183200   22.3700  146.1100       9.2        85       922        94
VIS    2025250    183200   22.3600  146.0800      10.0        93       941        97
VIS    2025250    183200   22.3700  146.0800      10.1        94       947        96
VIS    2025250    183200   22.3700  146.0500      10.8        95       955        96
VIS    2025250    183200   22.3500  145.7900      13.1        87       977        98
VIS    2025250    183200   22.3600  145.7600      13.3        87       943        99
VIS    2025250    183200   22.3600  145.7600      13.2        86       939        98
VIS    2025250    183200   22.3600  145.6800      13.3        88       921        91
VIS    2025250    183200   22.3500  145.6500      12.9        85       920        97
VIS    2025250    183200   22.3600  145.6300      12.0        88       921        98
VIS    2025250    183200   22.3600  145.6100      12.1        87       923        93
VIS    2025250    183200   22.3600  145.5700      12.9        90       942        99
VIS    2025250    183200   22.3600  145.5500      13.1        91       942        99
VIS    2025250    183200   22.3400  145.4000      12.2        88       987        95
VIS    2025250    183200   22.3400  145.3600      11.9        86       971        99
VIS    2025250    183200   22.3400  145.3500      12.2        84       971        96
VIS    2025250    183200   22.3400  145.3200      13.2        81       940        94
VIS    2025250    183200   22.3500  145.3000      13.2        76       940        90
VIS    2025250    183200   22.3400  145.2500      14.6        75       933        91
VIS    2025250    183200   22.3400  145.2300      14.2        79       936        94
VIS    2025250    183200   22.3400  145.2200      14.4        80       936        94
VIS    2025250    183200   22.3400  145.1500      13.3        91       975        97
VIS    2025250    183200   22.3400  145.1400      12.7        90       976        98
VIS    2025250    183200   22.3400  145.1000      12.7        87       973        96
VIS    2025250    183200   22.3400  145.0900      13.1        86       973        97
VIS    2025250    183200   22.3400  145.0500      14.1        88       947        96
VIS    2025250    183200   22.3500  145.0400      14.1        88       947        96
VIS    2025250    183200   22.3500  145.0100      14.3        91       966        97
VIS    2025250    183200   22.3400  144.9800      14.2        94       975        96
VIS    2025250    183200   22.3500  144.9500      13.1        93       999        98
VIS    2025250    183200   22.3300  144.9300      12.9        91       983        99
VIS    2025250    183200   22.3500  144.9100      14.2        90       970        97
VIS    2025250    183200   22.3500  144.8700      15.1        93       959        92
VIS    2025250    183200   22.3500  144.8700      15.1        93       959        93
VIS    2025250    183200   22.3500  144.8300      15.1        94       935        95
VIS    2025250    183200   22.3400  144.8000      14.9        95       934        94
VIS    2025250    183200   22.3300  144.7700      14.4        93       935        96
VIS    2025250    183200   22.3300  144.7600      14.2        92       935        96
VIS    2025250    183200   22.3400  144.7200      14.8        89       947        95
VIS    2025250    183200   22.3500  144.7000      14.7        88       961        96
VIS    2025250    183200   22.3400  144.6800      14.4        90       947        96
VIS    2025250    183200   22.3400  144.6700      13.9        88       942        97
VIS    2025250    183200   22.3300  144.6200      14.0        88       923        98
VIS    2025250    183200   22.3500  144.6100      13.9        82       923        96
VIS    2025250    183200   22.3300  144.5800      14.0        84       922        97
VIS    2025250    183200   22.3400  144.5700      13.9        83       931        97
VIS    2025250    183200   22.3400  144.5400      12.5        84       932        99
VIS    2025250    183200   22.3300  144.5000      12.3        84       925        97
VIS    2025250    183200   22.3300  144.4700      13.3        88       925        98
VIS    2025250    183200   22.3300  144.4700      13.2        88       925        99
VIS    2025250    183200   22.3500  144.4300      12.5        91       925        98
VIS    2025250    183200   22.3400  144.4200      12.4        89       923        99
VIS    2025250    183200   22.3300  144.3900      13.0        89       923        99
VIS    2025250    183200   22.3300  144.3500      12.9        90       922        99
VIS    2025250    183200   22.3400  144.3200      12.7        89       922        97
VIS    2025250    183200   22.3300  144.3200      12.4        89       920        97
VIS    2025250    183200   22.3400  144.2900      11.8        88       925        93
VIS    2025250    183200   22.3300  144.2500      11.7        94       925        95
VIS    2025250    183200   22.3300  144.2300      11.5        93       925        98
VIS    2025250    183200   22.3400  144.2000      10.7        91       919       100
VIS    2025250    183200   22.3400  144.1900      10.7        91       919       100
VIS    2025250    183200   22.3500  144.1500      11.2        92       919        98
VIS    2025250    183200   22.3300  144.1200      11.4        95       918        98
VIS    2025250    183200   22.3300  144.1100      11.3        94       918        98
VIS    2025250    183200   22.3400  144.0800      11.6        94       920        99
VIS    2025250    183200   22.3400  144.0500      11.5        93       921        99
VIS    2025250    183200   22.3500  144.0400      11.4        94       932        99
VIS    2025250    183200   22.3300  144.0000      11.7        90       916        99
VIS    2025250    183200   22.3300  143.9900      11.8        90       918        99
VIS    2025250    183200   22.3400  143.9700      11.3       100       935        95
VIS    2025250    183200   22.3300  143.9200      13.4        93       940        96
VIS    2025250    183200   22.3400  143.9200      13.4        93       940        96
VIS    2025250    183200   22.3400  143.8800      14.2        86       943        96
VIS    2025250    183200   22.3300  143.8700      14.3        87       943        96
VIS    2025250    183200   22.3500  143.8300      13.7        89       946        92
VIS    2025250    183200   22.3300  143.8100      13.6        88       918        97
VIS    2025250    183200   22.3400  143.7900      13.2        90       917        97
VIS    2025250    183200   22.3500  143.7600      14.7        94       916        91
VIS    2025250    183200   22.3500  143.7400      14.3        95       916        90
VIS    2025250    183200   22.3400  143.7100      13.0        93       914        94
VIS    2025250    183200   22.3200  143.6900      13.2        91       914        95
VIS    2025250    183200   22.3200  143.6500      13.3        91       914        96
VIS    2025250    183200   22.3200  143.6200      13.0        93       915        97
VIS    2025250    183200   22.3200  143.6100      12.8        92       915        97
VIS    2025250    183200   22.3400  143.5900      13.5        94       915        93
VIS    2025250    183200   22.3300  143.5600      12.5        90       915        98
VIS    2025250    183200   22.3300  143.5200      12.0        92       915        99
VIS    2025250    183200   22.3200  143.5000      12.0        92       915        99
VIS    2025250    183200   22.3300  143.4900      12.0        93       915        99
VIS    2025250    183200   22.3400  143.4700      12.0        97       915        98
VIS    2025250    183200   22.3400  143.4200      10.4        98       946        91
VIS    2025250    183200   22.3300  143.4000       9.9        95       951        91
VIS    2025250    183200   22.3300  143.3700      11.0        90       927        94
VIS    2025250    183200   22.3400  143.3600      10.2        89       927        93
VIS    2025250    183200   22.3200  143.2800      10.1        86       917        93
VIS    2025250    183200   22.3400  143.2500       9.4        90       918        95
VIS    2025250    183200   22.3300  143.2300       9.2        89       915        96
VIS    2025250    183200   22.3200  143.2000       9.3        88       914        98
VIS    2025250    183200   22.3300  143.1700       9.1        88       918        97
VIS    2025250    183200   22.3200  143.1500       9.2        90       916        98
VIS    2025250    183200   22.3400  143.1400       9.4        87       917        95
VIS    2025250    183200   22.3200  143.1000      10.1        85       916        99
VIS    2025250    183200   22.3300  143.0900      10.0        85       923        99
VIS    2025250    183200   22.3400  143.0000      10.7        86       985        96
VIS    2025250    183200   22.3200  142.9800      10.4        92       973        93
VIS    2025250    183200   22.3200  142.9600      10.7        92       951        96
VIS    2025250    183200   22.3200  142.9400      11.1        91       918        93
VIS    2025250    183200   22.3400  142.8300      12.4        91       963        97
VIS    2025250    183200   22.3200  142.6500      11.5        93       992        98
VIS    2025250    183200   22.3400  142.6300      10.6        92       965        98
VIS    2025250    183200   22.3200  142.4800      11.8        96       981        97
VIS    2025250    183200   22.3200  142.4500      11.7        93       981        98
VIS    2025250    183200   22.3200  142.4400      11.7        92       981        97
VIS    2025250    183200   22.4000  151.3500       6.7        83       982        95
VIS    2025250    183200   22.3900  151.3200       6.0        84       941        92
VIS    2025250    183200   22.3900  151.2000       5.5        85       936        98
VIS    2025250    183200   22.4000  151.1900       5.8        83       936        95
VIS    2025250    183200   22.4100  151.1600       5.0        87       888        97
VIS    2025250    183200   22.3800  149.9100       9.7       116       906        92
VIS    2025250    183200   22.3900  149.8700       8.5       101       891        97
VIS    2025250    183200   22.3800  149.8400       8.1        98       901        98
VIS    2025250    183200   22.3800  149.8200       8.2        97       947        91
VIS    2025250    183200   22.3700  149.7900       8.6        92       917        96
VIS    2025250    183200   22.3800  149.7600       8.4        93       907        97
VIS    2025250    183200   22.3900  149.7400       7.8        96       885        96
VIS    2025250    183200   22.3700  149.7200       8.0       102       878        98
VIS    2025250    183200   22.3800  149.2400       8.4        88       971        97
VIS    2025250    183200   22.3800  149.2300       8.4        87       960        97
VIS    2025250    183200   22.3700  149.2000       8.5        84       914        94
VIS    2025250    183200   22.3800  149.1800       8.5        85       878        92
VIS    2025250    183200   22.3600  149.0900       8.4        85       978        94
VIS    2025250    183200   22.3600  149.0600       8.9        86       977        90
VIS    2025250    183200   22.3600  149.0500       8.9        85       974        90
VIS    2025250    183200   22.3700  149.0100       8.7        82       969        94
VIS    2025250    183200   22.3700  149.0000       9.0        82       969        95
VIS    2025250    183200   22.3600  148.9600       9.1        81       956        92
VIS    2025250    183200   22.3600  148.9500       9.0        80       937        90
VIS    2025250    183200   22.3800  148.9100       8.2        81       908        90
VIS    2025250    183200   22.3800  148.9000       8.4        82       898        91
VIS    2025250    183200   22.3700  148.8700       8.8        82       889        91
VIS    2025250    183200   22.3500  148.8000       8.7        86       857        93
VIS    2025250    183200   22.3500  148.7900       8.8        88       858        93
VIS    2025250    183200   22.3700  148.7600       9.0        85       874        93
VIS    2025250    183200   22.3700  148.7500       9.2        86       876        92
VIS    2025250    183200   22.3700  148.7000       8.8        85       883        93
VIS    2025250    183200   22.3600  148.6900       9.0        89       883        93
VIS    2025250    183200   22.3700  148.6600       9.3        89       883        91
VIS    2025250    183200   22.3700  148.6300       9.9        87       883        92
VIS    2025250    183200   22.3700  148.6000      10.0        86       902        93
VIS    2025250    183200   22.3700  148.5900      10.1        85       907        93
VIS    2025250    183200   22.3700  148.5600      10.3        87       902        91
VIS    2025250    183200   22.3600  148.4200       9.7        88       977        99
VIS    2025250    183200   22.3600  148.4000       9.8        92       970        98
VIS    2025250    183200   22.3500  148.3700       9.4        88       892        96
VIS    2025250    183200   22.3600  148.3500       9.6        85       888        95
VIS    2025250    183200   22.3600  148.3200       9.1        84       880        92
VIS    2025250    183200   22.3700  148.3100       9.0        85       880        90
VIS    2025250    183200   22.3600  148.2800       8.8        88       883        96
VIS    2025250    183200   22.3700  148.2600       9.0        88       883        96
VIS    2025250    183200   22.3600  148.2300       8.2        83       802        92
VIS    2025250    183200   22.3700  148.1600       9.3        87       924        97
VIS    2025250    183200   22.3600  148.1200      10.1        86       975        99
VIS    2025250    183200   22.3600  148.0900      10.1        85       957        99
VIS    2025250    183200   22.3400  148.0600       9.5        84       945        99
VIS    2025250    183200   22.3400  148.0600       9.3        84       945        98
VIS    2025250    183200   22.3600  148.0100       9.4        82       930        94
VIS    2025250    183200   22.3600  148.0100       9.5        83       929        95
VIS    2025250    183200   22.3500  147.9600       9.8        89       889        97
VIS    2025250    183200   22.3600  147.9500       9.6        87       906        98
VIS    2025250    183200   22.3600  147.9300       9.2        87       889        97
VIS    2025250    183200   22.3600  147.8900       8.9        87       876        96
VIS    2025250    183200   22.3400  147.8700       8.1        84       876        95
VIS    2025250    183200   22.3600  147.8500       7.9        79       886        94
VIS    2025250    183200   22.3500  147.7600       8.9        80       960        96
VIS    2025250    183200   22.3600  147.7400       9.3        80       955        95
VIS    2025250    183200   22.3600  147.7300       9.4        80       952        96
VIS    2025250    183200   22.3600  147.6800      10.0        80       921        93
VIS    2025250    183200   22.3600  147.6500      10.0        81       921        96
VIS    2025250    183200   22.3500  147.6100       9.9        84       943        97
VIS    2025250    183200   22.3400  147.5900      10.3        84       962        98
VIS    2025250    183200   22.3600  147.5600      10.4        82       961        97
VIS    2025250    183200   22.3600  147.5400       9.4        82       971        94
VIS    2025250    183200   22.3400  147.4800       9.1        82       974        91
VIS    2025250    183200   22.3500  147.4500      10.8        85       984        94
VIS    2025250    183200   22.3400  147.4500      11.4        86       989        98
VIS    2025250    183200   22.3400  147.3300       7.6        86       982        93
VIS    2025250    183200   22.3500  147.3200       7.3        82       985        94
VIS    2025250    183200   22.3500  147.2900       7.6        87       976        95
VIS    2025250    183200   22.3400  147.2700       8.1        90       976        96
VIS    2025250    183200   22.3300  147.2200       8.3        90       995        91
VIS    2025250    183200   22.3300  147.1700       8.4        95       982        92
VIS    2025250    183200   22.3400  147.1500       8.0        89       978        92
VIS    2025250    183200   22.3400  146.4500       8.5       107       764        91
VIS    2025250    183200   22.3400  146.4400       8.1       103       777        91
VIS    2025250    183200   22.3200  146.3900      10.0        92       848        93
VIS    2025250    183200   22.3300  146.3700      10.6        92       852        94
VIS    2025250    183200   22.3400  146.3500      11.1        92       886        98
VIS    2025250    183200   22.3400  146.3100      11.6        90       851        90
VIS    2025250    183200   22.3400  146.2900      11.4        90       853        90
VIS    2025250    183200   22.3400  146.1900      11.3        87       881        94
VIS    2025250    183200   22.3300  146.1700      10.1        85       890        94
VIS    2025250    183200   22.3200  146.1600      10.1        86       905        96
VIS    2025250    183200   22.3300  146.1200      10.0        90       914        98
VIS    2025250    183200   22.3300  146.0900      11.6        88       916       100
VIS    2025250    183200   22.3300  146.0600      12.6        89       933        93
VIS    2025250    183200   22.3400  146.0400      12.8        92       944        93
VIS    2025250    183200   22.3200  145.8200      12.6        89       973        94
VIS    2025250    183200   22.3300  145.8000      12.7        87       967        97
VIS    2025250    183200   22.3300  145.7800      13.3        87       931        95
VIS    2025250    183200   22.3400  145.7600      13.2        83       931        91
VIS    2025250    183200   22.3200  145.7400      12.8        82       924        90
VIS    2025250    183200   22.3200  145.6700      12.4        87       924        98
VIS    2025250    183200   22.3200  145.6500      12.6        85       924        97
VIS    2025250    183200   22.3200  145.6300      12.3        86       927        99
VIS    2025250    183200   22.3200  145.6100      12.1        84       932        95
VIS    2025250    183200   22.3200  145.5600      12.1        81       961        99
VIS    2025250    183200   22.3100  145.3700      13.1        84       975        99
VIS    2025250    183200   22.3200  145.3600      12.7        85       971        98
VIS    2025250    183200   22.3200  145.3400      12.9        83       946        97
VIS    2025250    183200   22.3200  145.3100      13.4        83       934        96
VIS    2025250    183200   22.3200  145.2800      14.5        78       929        95
VIS    2025250    183200   22.3300  145.2500      14.6        76       931        90
VIS    2025250    183200   22.3300  145.2200      14.2        81       936        95
VIS    2025250    183200   22.3300  145.2100      14.2        81       936        96
VIS    2025250    183200   22.3300  145.1900      13.7        85       939        98
VIS    2025250    183200   22.3300  145.1400      12.7        92       976        97
VIS    2025250    183200   22.3300  145.1400      12.4        90       976        97
VIS    2025250    183200   22.3200  145.1100      12.5        89       980        98
VIS    2025250    183200   22.3300  145.0700      13.9        87       947        95
VIS    2025250    183200   22.3100  145.0400      14.7        91       930        94
VIS    2025250    183200   22.3100  145.0300      14.5        91       929        92
VIS    2025250    183200   22.3100  145.0000      14.3        92       928        91
VIS    2025250    183200   22.3300  144.9700      14.1        95       975        97
VIS    2025250    183200   22.3200  144.9600      13.8        93       975        98
VIS    2025250    183200   22.3200  144.9300      13.1        88       970        99
VIS    2025250    183200   22.3200  144.9100      13.4        90       955        98
VIS    2025250    183200   22.3200  144.8800      14.7        92       946        94
VIS    2025250    183200   22.3300  144.8500      15.0        92       933        92
VIS    2025250    183200   22.3300  144.8200      15.4        92       935        93
VIS    2025250    183200   22.3200  144.8000      15.2        92       935        93
VIS    2025250    183200   22.3200  144.7700      14.6        92       935        94
VIS    2025250    183200   22.3200  144.7500      14.3        89       934        96
VIS    2025250    183200   22.3200  144.7400      14.3        89       934        96
VIS    2025250    183200   22.3100  144.7000      14.9        92       939        95
VIS    2025250    183200   22.3100  144.6700      14.5        93       936        96
VIS    2025250    183200   22.3100  144.6500      14.2        92       928        97
VIS    2025250    183200   22.3300  144.6200      14.0        89       920        98
VIS    2025250    183200   22.3100  144.6100      13.8        88       920        98
VIS    2025250    183200   22.3300  144.5800      14.1        84       922        97
VIS    2025250    183200   22.3200  144.5600      14.0        85       922        97
VIS    2025250    183200   22.3100  144.5200      12.9        89       922        92
VIS    2025250    183200   22.3200  144.5000      12.6        86       925        97
VIS    2025250    183200   22.3200  144.4700      13.1        88       925        98
VIS    2025250    183200   22.3000  144.4400      13.0        89       922        95
VIS    2025250    183200   22.3200  144.4200      12.8        88       922        99
VIS    2025250    183200   22.3200  144.4100      13.0        89       922        99
VIS    2025250    183200   22.3100  144.3800      13.2        91       919        99
VIS    2025250    183200   22.3100  144.3500      12.6        91       919        99
VIS    2025250    183200   22.3200  144.3300      12.6        90       920        98
VIS    2025250    183200   22.3000  144.2900      12.0        93       919        97
VIS    2025250    183200   22.3100  144.2900      12.0        93       919        95
VIS    2025250    183200   22.3000  144.2400      11.0        91       925        92
VIS    2025250    183200   22.3000  144.2200      11.2        88       919        93
VIS    2025250    183200   22.3000  144.2100      11.5        88       917        96
VIS    2025250    183200   22.3000  144.1700      12.0        90       915        99
VIS    2025250    183200   22.3100  144.1400      11.8        91       917       100
VIS    2025250    183200   22.3100  144.1400      11.8        92       917       100
VIS    2025250    183200   22.3200  144.0900      11.5        94       917        99
VIS    2025250    183200   22.3100  144.0800      11.5        95       915        98
VIS    2025250    183200   22.3200  144.0600      11.7        94       916        99
VIS    2025250    183200   22.3000  144.0300      11.7        94       916        98
VIS    2025250    183200   22.3200  143.9900      12.0        90       919        99
VIS    2025250    183200   22.3200  143.9900      12.0        91       922        99
VIS    2025250    183200   22.3200  143.9600      12.2        92       935        96
VIS    2025250    183200   22.3000  143.9300      13.4        91       921        97
VIS    2025250    183200   22.3100  143.9100      14.6        91       940        95
VIS    2025250    183200   22.3000  143.8700      14.4        88       944        96
VIS    2025250    183200   22.3000  143.8500      14.2        88       938        96
VIS    2025250    183200   22.3100  143.8400      14.1        89       921        95
VIS    2025250    183200   22.3100  143.7900      13.2        88       917        97
VIS    2025250    183200   22.3100  143.7900      13.3        88       917        97
VIS    2025250    183200   22.3000  143.7600      13.9        88       917        92
VIS    2025250    183200   22.3000  143.7400      14.0        89       915        91
VIS    2025250    183200   22.3000  143.7000      13.3        89       914        97
VIS    2025250    183200   22.3100  143.6800      13.6        90       914        97
VIS    2025250    183200   22.3000  143.6500      13.0        93       914        97
VIS    2025250    183200   22.3100  143.6200      12.7        93       915        97
VIS    2025250    183200   22.3000  143.6100      12.2        92       915        97
VIS    2025250    183200   22.3100  143.5900      12.3        90       915        99
VIS    2025250    183200   22.3100  143.5400      12.0        88       915        99
VIS    2025250    183200   22.3200  143.5400      11.9        89       915        99
VIS    2025250    183200   22.3000  143.5000      12.7        93       915        97
VIS    2025250    183200   22.3100  143.4700      12.1        94       915        98
VIS    2025250    183200   22.3000  143.4500      10.9        90       940        96
VIS    2025250    183200   22.3200  143.4400      10.6        94       946        96
VIS    2025250    183200   22.3000  143.4000       9.4        85       923        93
VIS    2025250    183200   22.3100  143.3800      10.6        84       923        92
VIS    2025250    183200   22.3000  143.3500      10.2        81       916        94
VIS    2025250    183200   22.3100  143.3100      10.8        79       917        92
VIS    2025250    183200   22.3200  143.2800      10.6        84       916        92
VIS    2025250    183200   22.3100  143.2600      10.3        86       915        96
VIS    2025250    183200   22.2900  143.2200       9.6        89       911        98
VIS    2025250    183200   22.3200  143.2100       9.4        88       914        98
VIS    2025250    183200   22.3100  143.1800       9.5        88       912        98
VIS    2025250    183200   22.2900  143.1500       9.4        92       902        96
VIS    2025250    183200   22.3000  143.1400       9.6        92       901        97
VIS    2025250    183200   22.3100  143.0900      10.3        84       903        99
VIS    2025250    183200   22.2900  143.0800      10.7        83       901        97
VIS    2025250    183200   22.2900  143.0600      10.7        80       946        95
VIS    2025250    183200   22.3100  142.9500      11.2        91       917        90
VIS    2025250    183200   22.2900  142.8900      12.4        91       909        98
VIS    2025250    183200   22.3000  142.7700      10.8        87       962        95
VIS    2025250    183200   22.3000  142.7600      10.8        87       991        92
VIS    2025250    183200   22.2900  142.7200      11.6        89       979        97
VIS    2025250    183200   22.2900  142.6700      11.7        93       968        99
VIS    2025250    183200   22.3000  142.6500      11.2        91       968        99
VIS    2025250    183200   22.3000  142.6200      10.8        90       969       100
VIS    2025250    183200   22.3000  142.6100      10.6        89       969        99
VIS    2025250    183200   22.2900  142.5700      11.4        87       963        96
VIS    2025250    183200   22.2900  142.5000      12.3        97       978        94
VIS    2025250    183200   22.2900  142.4700      11.7        95       978        97
VIS    2025250    183200   22.3000  142.4500      11.8        93       981        96
VIS    2025250    183200   22.2900  142.4300      11.7        90       938        98
VIS    2025250    183200   22.3800  151.3700       7.2        79       982        93
VIS    2025250    183200   22.3800  151.3500       6.2        79       928        95
VIS    2025250    183200   22.3900  151.3400       5.8        78       952        97
VIS    2025250    183200   22.3900  151.3100       6.0        86       931        91
VIS    2025250    183200   22.3800  151.2400       4.6        86       915        90
VIS    2025250    183200   22.3800  151.2100       5.3        84       907        98
VIS    2025250    183200   22.3700  149.9700      11.6       119       896        90
VIS    2025250    183200   22.3500  149.9000      11.1       115       869        93
VIS    2025250    183200   22.3400  149.8700       9.2       104       870        91
VIS    2025250    183200   22.3500  149.8500       8.4        99       887        92
VIS    2025250    183200   22.3600  149.8300       8.1        98       896        97
VIS    2025250    183200   22.3600  149.8100       8.2        96       908        98
VIS    2025250    183200   22.3600  149.7900       8.4        93       908        97
VIS    2025250    183200   22.3600  149.7600       8.6        93       907        97
VIS    2025250    183200   22.3400  149.7200       8.2       105       800        93
VIS    2025250    183200   22.3400  149.6900       8.0       108       797        94
VIS    2025250    183200   22.3400  149.2300       8.6        87       987        96
VIS    2025250    183200   22.3400  149.1900       8.5        81       917        92
VIS    2025250    183200   22.3500  149.1000       8.4        84       978        93
VIS    2025250    183200   22.3400  149.0800       8.6        86       973        91
VIS    2025250    183200   22.3500  149.0600       9.0        87       974        90
VIS    2025250    183200   22.3500  149.0200       9.2        79       964        92
VIS    2025250    183200   22.3300  149.0000       9.0        78       964        93
VIS    2025250    183200   22.3300  148.9700       8.7        79       956        91
VIS    2025250    183200   22.3500  148.9600       9.0        79       937        92
VIS    2025250    183200   22.3300  148.8700       9.4        84       880        92
VIS    2025250    183200   22.3300  148.8400       9.1        83       879        90
VIS    2025250    183200   22.3300  148.8400       9.2        83       871        90
VIS    2025250    183200   22.3500  148.8100       8.9        86       858        91
VIS    2025250    183200   22.3300  148.7700       9.1        93       860        92
VIS    2025250    183200   22.3300  148.7600       9.0        93       866        92
VIS    2025250    183200   22.3500  148.7300       9.2        92       879        92
VIS    2025250    183200   22.3300  148.7000       9.2        94       876        94
VIS    2025250    183200   22.3300  148.6800       9.1        94       876        96
VIS    2025250    183200   22.3400  148.6500       9.2        91       869        94
VIS    2025250    183200   22.3400  148.6200       9.9        89       867        90
VIS    2025250    183200   22.3400  148.6000      10.1        89       867        90
VIS    2025250    183200   22.3500  148.5400       9.7        87       896        95
VIS    2025250    183200   22.3400  148.5200       9.5        87       896        96
VIS    2025250    183200   22.3400  148.4400       9.4        81       977        96
VIS    2025250    183200   22.3300  148.4100       9.3        89       953        97
VIS    2025250    183200   22.3400  148.4000       9.6        92       953        96
VIS    2025250    183200   22.3300  148.3800       9.1        87       890        95
VIS    2025250    183200   22.3200  148.3500       9.0        85       881        95
VIS    2025250    183200   22.3300  148.3300       9.0        86       880        96
VIS    2025250    183200   22.3200  148.2900       8.7        88       883        95
VIS    2025250    183200   22.3300  148.2600       8.5        89       884        96
VIS    2025250    183200   22.3200  148.2500       8.6        90       884        95
VIS    2025250    183200   22.3300  148.2200       8.5        88       804        91
VIS    2025250    183200   22.3200  148.1800       9.0        86       832        94
VIS    2025250    183200   22.3300  148.1600       9.3        86       925        99
VIS    2025250    183200   22.3300  148.1300       9.9        86       969        98
VIS    2025250    183200   22.3400  148.1200      10.3        86       969        98
VIS    2025250    183200   22.3200  148.0900      10.0        85       948        97
VIS    2025250    183200   22.3300  148.0700       9.6        84       939        99
VIS    2025250    183200   22.3200  148.0300       8.7        83       929        96
VIS    2025250    183200   22.3200  148.0100       8.7        84       889        95
VIS    2025250    183200   22.3200  147.9700       9.5        90       857        94
VIS    2025250    183200   22.3300  147.9700       9.6        90       865        95
VIS    2025250    183200   22.3200  147.9400       9.5        89       873        93
VIS    2025250    183200   22.3300  147.9100       9.5        88       866        90
VIS    2025250    183200   22.3400  147.8700       8.4        85       865        94
VIS    2025250    183200   22.3400  147.8700       8.1        84       866        94
VIS    2025250    183200   22.3200  147.8400       7.3        81       909        93
VIS    2025250    183200   22.3200  147.8100       8.5        86       934        97
VIS    2025250    183200   22.3200  147.7900       8.8        86       948        98
VIS    2025250    183200   22.3300  147.7500       8.5        79       948        97
VIS    2025250    183200   22.3100  147.7300       9.1        81       936        93
VIS    2025250    183200   22.3200  147.7200       9.2        79       936        95
VIS    2025250    183200   22.3200  147.6700       9.4        81       936        96
VIS    2025250    183200   22.3200  147.6500       9.6        84       951        97
VIS    2025250    183200   22.3200  147.6400       9.4        86       969        97
VIS    2025250    183200   22.3100  147.5900      10.0        84       945        99
VIS    2025250    183200   22.3300  147.5700      10.4        83       962        99
VIS    2025250    183200   22.3300  147.5600      10.5        83       962        98
VIS    2025250    183200   22.3200  147.5300      10.0        85       964        96
VIS    2025250    183200   22.3200  147.5100       9.4        84       966        96
VIS    2025250    183200   22.3300  147.4900       9.0        82       974        93
VIS    2025250    183200   22.3300  147.4400      11.0        87       985        98
VIS    2025250    183200   22.3300  147.4300      10.6        87       992       100
VIS    2025250    183200   22.3300  147.4100      10.4        86       992        90
VIS    2025250    183200   22.3100  147.3600       8.6        83       969        95
VIS    2025250    183200   22.3200  147.3500       7.9        83       971        95
VIS    2025250    183200   22.3300  147.3400       7.8        86       982        93
VIS    2025250    183200   22.3100  147.2900       9.8       100       967        94
VIS    2025250    183200   22.3200  147.2800       8.9        96       971        96
VIS    2025250    183200   22.3200  147.2600       8.8        96       973        95
VIS    2025250    183200   22.3100  146.4600       8.6       110       757        96
VIS    2025250    183200   22.3000  146.4300       9.4       100       831        93
VIS    2025250    183200   22.3000  146.4100       9.9        95       834        91
VIS    2025250    183200   22.3100  146.4000      10.1        94       842        93
VIS    2025250    183200   22.3100  146.3600      11.1        95       849        92
VIS    2025250    183200   22.3200  146.3400      11.5        94       849        90
VIS    2025250    183200   22.3000  146.2700      11.5        89       866        92
VIS    2025250    183200   22.3000  146.2200      12.6        83       899        94
VIS    2025250    183200   22.3200  146.1700      10.3        85       890        96
VIS    2025250    183200   22.3100  146.1300      10.6        90       907        99
VIS    2025250    183200   22.3200  146.1200      10.6        91       907        99
VIS    2025250    183200   22.3200  146.0900      12.3        89       916       100
VIS    2025250    183200   22.3000  146.0700      12.4        89       930        99
VIS    2025250    183200   22.2900  146.0500      11.7        86       943        97
VIS    2025250    183200   22.3100  145.9900      12.4        81       981        96
VIS    2025250    183200   22.3100  145.9200      14.2        85       977        95
VIS    2025250    183200   22.2900  145.8400      13.3        86       973        93
VIS    2025250    183200   22.3000  145.8300      13.2        87       973        94
VIS    2025250    183200   22.3000  145.7900      13.2        86       922        95
VIS    2025250    183200   22.2900  145.7600      13.6        85       922        96
VIS    2025250    183200   22.3000  145.7500      13.3        83       924        95
VIS    2025250    183200   22.3100  145.7100      11.4        80       927        93
VIS    2025250    183200   22.3000  145.7100      11.2        81       927        95
VIS    2025250    183200   22.3100  145.6700      12.1        87       924        97
VIS    2025250    183200   22.3100  145.6600      12.3        86       924        96
VIS    2025250    183200   22.3100  145.6100      12.2        84       932        97
VIS    2025250    183200   22.3000  145.6000      11.1        89       934        99
VIS    2025250    183200   22.3100  145.5600      12.3        80       961        99
VIS    2025250    183200   22.2900  145.3700      13.7        85       975        97
VIS    2025250    183200   22.2900  145.3500      13.4        86       951        96
VIS    2025250    183200   22.2900  145.3400      13.3        84       940        96
VIS    2025250    183200   22.2900  145.2900      15.0        83       927        96
VIS    2025250    183200   22.3000  145.2700      14.3        81       926        96
VIS    2025250    183200   22.2900  145.2500      13.6        85       931        98
VIS    2025250    183200   22.3000  145.2200      14.0        84       936        97
VIS    2025250    183200   22.2900  145.2000      13.3        83       939        99
VIS    2025250    183200   22.2900  145.1600      12.4        85       966        97
VIS    2025250    183200   22.3100  145.1300      12.6        88       980        98
VIS    2025250    183200   22.3100  145.1100      12.8        88       959        99
VIS    2025250    183200   22.3100  145.0900      13.3        87       951        98
VIS    2025250    183200   22.2800  145.0600      14.2        89       922        96
VIS    2025250    183200   22.2900  145.0300      14.6        91       919        91
VIS    2025250    183200   22.2900  144.9900      14.5        88       918        95
VIS    2025250    183200   22.3000  144.9700      14.3        88       938        97
VIS    2025250    183200   22.2900  144.9600      14.2        84       936        97
VIS    2025250    183200   22.2800  144.9200      14.3        86       935        94
VIS    2025250    183200   22.3000  144.9100      14.1        88       946        97
VIS    2025250    183200   22.2900  144.8700      14.8        91       932        96
VIS    2025250    183200   22.2900  144.8400      14.9        89       932        96
VIS    2025250    183200   22.2800  144.8200      15.4        88       934        95
VIS    2025250    183200   22.2800  144.7900      15.4        91       937        93
VIS    2025250    183200   22.2900  144.7900      15.3        91       938        92
VIS    2025250    183200   22.2900  144.7400      14.4        88       934        95
VIS    2025250    183200   22.3000  144.7400      14.4        89       934        94
VIS    2025250    183200   22.3000  144.6900      14.9        91       937        94
VIS    2025250    183200   22.2900  144.6700      14.5        91       936        95
VIS    2025250    183200   22.2800  144.6400      14.3        90       925        96
VIS    2025250    183200   22.2800  144.6100      14.0        88       920        96
VIS    2025250    183200   22.2800  144.6100      14.0        88       920        96
VIS    2025250    183200   22.2900  144.5900      14.0        87       920        98
VIS    2025250    183200   22.3000  144.5500      13.8        88       922        97
VIS    2025250    183200   22.2800  144.5300      13.3        90       922        97
VIS    2025250    183200   22.2800  144.5000      12.7        90       923        97
VIS    2025250    183200   22.3000  144.4700      12.1        89       925        95
VIS    2025250    183200   22.3000  144.4400      12.7        89       922        95
VIS    2025250    183200   22.2800  144.4200      13.2        90       913        98
VIS    2025250    183200   22.2800  144.4000      13.5        90       913        98
VIS    2025250    183200   22.2800  144.3700      12.4        87       913        99
VIS    2025250    183200   22.3000  144.3400      12.5        89       919        98
VIS    2025250    183200   22.3000  144.3400      12.5        89       919        96
VIS    2025250    183200   22.3000  144.2900      12.1        92       919        97
VIS    2025250    183200   22.3000  144.2800      12.0        93       920        98
VIS    2025250    183200   22.2800  144.2600      11.5        91       920        97
VIS    2025250    183200   22.2800  144.1900      12.7        90       915        96
VIS    2025250    183200   22.2900  144.1800      12.5        89       915        97
VIS    2025250    183200   22.2900  144.1500      12.1        90       914        99
VIS    2025250    183200   22.2900  144.1200      11.9        94       914        99
VIS    2025250    183200   22.2800  144.1100      12.0        94       913        99
VIS    2025250    183200   22.2900  144.0800      11.6        94       914        97
VIS    2025250    183200   22.2900  144.0600      11.7        94       915        95
VIS    2025250    183200   22.3000  144.0400      11.6        94       916        98
VIS    2025250    183200   22.3000  144.0100      12.1        92       918        98
VIS    2025250    183200   22.2900  143.9600      12.3        89       919        98
VIS    2025250    183200   22.2900  143.9400      12.9        92       919        98
VIS    2025250    183200   22.2800  143.9300      12.8        93       920        98
VIS    2025250    183200   22.3000  143.9100      14.2        92       938        95
VIS    2025250    183200   22.2800  143.8700      14.4        91       951        96
VIS    2025250    183200   22.2900  143.8600      14.4        88       944        96
VIS    2025250    183200   22.2800  143.8200      13.9        92       919        96
VIS    2025250    183200   22.2800  143.8000      13.5        91       918        97
VIS    2025250    183200   22.2900  143.7700      13.7        88       917        91
VIS    2025250    183200   22.2900  143.7600      14.0        88       917        90
VIS    2025250    183200   22.2900  143.7400      14.1        88       915        91
VIS    2025250    183200   22.2900  143.7000      13.2        89       915        97
VIS    2025250    183200   22.2900  143.6800      13.7        89       915        96
VIS    2025250    183200   22.2700  143.6400      13.1        92       915        97
VIS    2025250    183200   22.2900  143.6300      12.2        95       915        98
VIS    2025250    183200   22.2700  143.5900      11.7        91       916        99
VIS    2025250    183200   22.2900  143.5700      12.0        87       915        99
VIS    2025250    183200   22.2800  143.5500      12.0        86       915        99
VIS    2025250    183200   22.2900  143.5300      12.2        88       915        98
VIS    2025250    183200   22.2900  143.5000      12.8        94       915        97
VIS    2025250    183200   22.2800  143.4700      11.6        97       918        94
VIS    2025250    183200   22.2900  143.4500      11.2        92       923        96
VIS    2025250    183200   22.2900  143.4400      10.2        91       939        91
VIS    2025250    183200   22.2900  143.4100       9.1        86       924        91
VIS    2025250    183200   22.2700  143.3900      10.0        84       916        95
VIS    2025250    183200   22.2900  143.3600      10.3        81       916        94
VIS    2025250    183200   22.2700  143.3300      10.5        85       914        97
VIS    2025250    183200   22.2800  143.3100      11.5        84       914        96
VIS    2025250    183200   22.2700  143.2700      11.0        86       909        97
VIS    2025250    183200   22.2700  143.2600      10.4        86       909        92
VIS    2025250    183200   22.2800  143.1300       9.7        95       901        95
VIS    2025250    183200   22.2800  143.1000      10.2        88       901        97
VIS    2025250    183200   22.2700  143.0700      11.0        84       919        92
VIS    2025250    183200   22.2700  143.0500      10.7        87       946        92
VIS    2025250    183200   22.2700  143.0400      10.4        93       946        91
VIS    2025250    183200   22.2800  142.7100      11.4        89       983        97
VIS    2025250    183200   22.2800  142.6700      11.4        95       968        98
VIS    2025250    183200   22.2700  142.6400      11.2        93       938        96
VIS    2025250    183200   22.2700  142.6400      11.1        93       928        95
VIS    2025250    183200   22.2600  142.6000      10.4        90       911        93
VIS    2025250    183200   22.2900  142.5700      11.1        87       937        97
VIS    2025250    183200   22.2800  142.5600      11.5        87       937        94
VIS    2025250    183200   22.2600  142.5400      11.7        88       937        92
VIS    2025250    183200   22.2600  142.5000      11.7        89       973        99
VIS    2025250    183200   22.2800  142.4700      11.7        93       978        98
VIS    2025250    183200   22.2700  142.4500      11.9        92       948        98
VIS    2025250    183200   22.2800  142.4300      11.7        90       925        98
VIS    2025250    183200   22.3600  151.3600       6.8        80       935        91
VIS    2025250    183200   22.3400  151.3200       6.0        78       861        93
VIS    2025250    183200   22.3400  151.3100       6.1        77       861        92
VIS    2025250    183200   22.3600  151.2100       5.1        84       896        93
VIS    2025250    183200   22.3600  151.1700       5.2        83       858        90
VIS    2025250    183200   22.3500  151.1600       4.9        81       858        92
VIS    2025250    183200   22.3400  151.0900       4.8        70       858        91
VIS    2025250    183200   22.3300  149.9700      12.0       118       896        90
VIS    2025250    183200   22.3200  149.9500      11.5       119       866        93
VIS    2025250    183200   22.3200  149.9100      12.1       119       866        91
VIS    2025250    183200   22.3400  149.8900      10.4       110       869        94
VIS    2025250    183200   22.3400  149.8200       8.0        98       890        97
VIS    2025250    183200   22.3200  149.8100       7.9        95       896        98
VIS    2025250    183200   22.3200  149.7700       8.0        96       903        99
VIS    2025250    183200   22.3200  149.7600       8.1        97       903        99
VIS    2025250    183200   22.3400  149.7200       8.2       104       800        93
VIS    2025250    183200   22.3300  149.6900       8.1       107       800        93
VIS    2025250    183200   22.3300  149.6800       8.0       108       864        97
VIS    2025250    183200   22.3200  149.1300       8.3        77       979        92
VIS    2025250    183200   22.3300  149.1000       8.6        80       978        90
VIS    2025250    183200   22.3100  149.0400       8.5        81       954        96
VIS    2025250    183200   22.3200  149.0100       8.9        77       964        93
VIS    2025250    183200   22.3100  148.9900       8.3        76       956        90
VIS    2025250    183200   22.3200  148.9200       9.3        80       880        91
VIS    2025250    183200   22.3100  148.8800       9.5        85       878        92
VIS    2025250    183200   22.3100  148.8600       9.3        88       880        93
VIS    2025250    183200   22.3200  148.8500       9.1        84       879        91
VIS    2025250    183200   22.3000  148.8200       9.2        93       870        93
VIS    2025250    183200   22.3200  148.7800       9.2        93       860        92
VIS    2025250    183200   22.3200  148.7700       9.1        94       860        91
VIS    2025250    183200   22.3000  148.7400       8.6        94       866        96
VIS    2025250    183200   22.3000  148.7000       9.3        95       866        93
VIS    2025250    183200   22.3000  148.6900       9.3        96       867        94
VIS    2025250    183200   22.3000  148.6700       8.9        95       867        96
VIS    2025250    183200   22.3200  148.6300       9.3        90       867        95
VIS    2025250    183200   22.3200  148.6100       9.5        92       867        95
VIS    2025250    183200   22.3000  148.5800       9.4        90       867        94
VIS    2025250    183200   22.3000  148.5500       9.5        84       878        95
VIS    2025250    183200   22.3000  148.5300       9.9        84       890        94
VIS    2025250    183200   22.3100  148.5100       9.8        83       896        95
VIS    2025250    183200   22.3000  148.4900       9.8        82       918        97
VIS    2025250    183200   22.3000  148.4600       9.2        81       983        99
VIS    2025250    183200   22.3000  148.4300       9.5        75       963        93
VIS    2025250    183200   22.3000  148.3900       9.0        78       890        93
VIS    2025250    183200   22.3100  148.3800       8.8        83       890        95
VIS    2025250    183200   22.3200  148.3500       8.9        84       881        95
VIS    2025250    183200   22.3200  148.3400       9.0        85       881        96
VIS    2025250    183200   22.3200  148.3100       8.8        87       881        96
VIS    2025250    183200   22.3100  148.2900       8.5        87       884        90
VIS    2025250    183200   22.3200  148.2600       8.6        89       884        94
VIS    2025250    183200   22.3200  148.2300       8.8        91       808        92
VIS    2025250    183200   22.3200  148.2100       9.1        90       807        93
VIS    2025250    183200   22.3100  148.1700       9.0        85       851        95
VIS    2025250    183200   22.3000  148.1600       8.9        84       881        97
VIS    2025250    183200   22.3100  148.1200       9.6        86       969        98
VIS    2025250    183200   22.3100  148.0900      10.0        85       948        97
VIS    2025250    183200   22.3100  148.0700       9.7        85       938        98
VIS    2025250    183200   22.2900  148.0500       9.2        84       903        94
VIS    2025250    183200   22.2900  148.0200       8.7        85       875        93
VIS    2025250    183200   22.3000  148.0100       8.8        87       869        94
VIS    2025250    183200   22.2900  147.9800       9.5        91       855        90
VIS    2025250    183200   22.3100  147.9400       9.4        89       866        94
VIS    2025250    183200   22.3100  147.9300       9.4        89       866        94
VIS    2025250    183200   22.3100  147.9000       9.3        87       865        93
VIS    2025250    183200   22.3100  147.8600       8.0        80       882        94
VIS    2025250    183200   22.3100  147.8600       7.7        81       882        94
VIS    2025250    183200   22.3000  147.8100       8.2        84       934        96
VIS    2025250    183200   22.3000  147.8000       8.5        85       934        97
VIS    2025250    183200   22.2900  147.7600       9.1        86       937        99
VIS    2025250    183200   22.3100  147.7400       8.9        84       929        93
VIS    2025250    183200   22.3100  147.7100       9.5        80       936        98
VIS    2025250    183200   22.3100  147.7000       9.6        80       936        99
VIS    2025250    183200   22.2900  147.6600       9.3        83       977        99
VIS    2025250    183200   22.2900  147.6300       9.7        84       950        97
VIS    2025250    183200   22.3000  147.6100       9.9        85       945        98
VIS    2025250    183200   22.3000  147.5900      10.0        85       935        97
VIS    2025250    183200   22.2900  147.5600      10.4        88       909        91
VIS    2025250    183200   22.3000  147.5500      10.5        87       930        92
VIS    2025250    183200   22.3100  147.4500       9.9        95       972        92
VIS    2025250    183200   22.2900  147.4200      10.0        90       972        99
VIS    2025250    183200   22.2900  147.4000      10.3        88       964        98
VIS    2025250    183200   22.2800  147.3600       9.1        84       964        98
VIS    2025250    183200   22.3000  147.3400       8.2        86       970        96
VIS    2025250    183200   22.3000  147.3100       9.0        92       967        97
VIS    2025250    183200   22.3000  147.3000       9.6        98       967        95
VIS    2025250    183200   22.3000  147.2700       9.2       101       961        93
VIS    2025250    183200   22.2800  147.2400       8.0        97       955        93
VIS    2025250    183200   22.2800  147.2200       7.4        93       985        93
VIS    2025250    183200   22.2900  146.4200       9.8        95       834        90
VIS    2025250    183200   22.2700  146.4100      10.1        93       888        94
VIS    2025250    183200   22.2800  146.3700      10.6        95       849        94
VIS    2025250    183200   22.2900  146.3600      10.9        97       849        91
VIS    2025250    183200   22.2800  146.3400      11.4       102       849        90
VIS    2025250    183200   22.2700  146.3100      11.0        95       866        96
VIS    2025250    183200   22.2800  146.2800      11.7        86       878        95
VIS    2025250    183200   22.2900  146.2500      12.0        85       893        95
VIS    2025250    183200   22.2900  146.2400      12.5        85       899        95
VIS    2025250    183200   22.2800  146.2000      12.7        87       905        98
VIS    2025250    183200   22.2800  146.1700      12.4        89       907        99
VIS    2025250    183200   22.2900  146.1600      11.3        91       905       100
VIS    2025250    183200   22.2700  146.1200      11.2        93       908       100
VIS    2025250    183200   22.2800  146.0900      11.8        92       914       100
VIS    2025250    183200   22.2700  146.0700      11.3        89       927        99
VIS    2025250    183200   22.2800  146.0600      11.8        89       933        99
VIS    2025250    183200   22.2700  145.9900       9.9        83       978        95
VIS    2025250    183200   22.2900  145.9100      13.4        84       977        97
VIS    2025250    183200   22.2700  145.8600      14.0        82       986        98
VIS    2025250    183200   22.2900  145.8500      13.7        84       980        91
VIS    2025250    183200   22.2700  145.8200      13.0        85       928        99
VIS    2025250    183200   22.2800  145.8100      12.9        87       922        99
VIS    2025250    183200   22.2800  145.7700      13.0        85       924        97
VIS    2025250    183200   22.2800  145.7500      13.7        84       933        96
VIS    2025250    183200   22.2700  145.7300      14.4        82       936        94
VIS    2025250    183200   22.2900  145.7100      11.7        81       931        94
VIS    2025250    183200   22.2700  145.6800      12.1        81       935        91
VIS    2025250    183200   22.2700  145.6400      13.1        86       934       100
VIS    2025250    183200   22.2800  145.6100      12.0        89       934        99
VIS    2025250    183200   22.2900  145.6100      11.6        89       934       100
VIS    2025250    183200   22.2800  145.3900      14.3        85       987        94
VIS    2025250    183200   22.2800  145.3500      13.4        85       951        96
VIS    2025250    183200   22.2600  145.3300      13.6        84       948        98
VIS    2025250    183200   22.2700  145.2900      14.7        85       927        97
VIS    2025250    183200   22.2600  145.2800      14.6        86       927        97
VIS    2025250    183200   22.2800  145.2500      13.2        86       931        99
VIS    2025250    183200   22.2800  145.1700      12.3        85       966        98
VIS    2025250    183200   22.2800  145.1600      12.2        86       966        98
VIS    2025250    183200   22.2800  145.1200      13.1        87       959        99
VIS    2025250    183200   22.2800  145.1000      13.3        87       945        98
VIS    2025250    183200   22.2700  145.0800      13.6        87       931        98
VIS    2025250    183200   22.2800  145.0600      14.2        88       922        96
VIS    2025250    183200   22.2600  145.0200      14.6        88       919        95
VIS    2025250    183200   22.2700  144.9900      14.4        87       918        96
VIS    2025250    183200   22.2600  144.9600      14.0        84       935        98
VIS    2025250    183200   22.2600  144.9500      14.0        84       935        98
VIS    2025250    183200   22.2600  144.9100      14.8        88       930        94
VIS    2025250    183200   22.2800  144.9100      14.7        86       934        93
VIS    2025250    183200   22.2700  144.8800      15.2        89       925        94
VIS    2025250    183200   22.2600  144.8400      15.6        90       930        94
VIS    2025250    183200   22.2800  144.8300      15.3        88       933        95
VIS    2025250    183200   22.2800  144.8100      15.5        89       937        93
VIS    2025250    183200   22.2800  144.7800      15.4        92       937        93
VIS    2025250    183200   22.2600  144.7600      14.6        89       934        94
VIS    2025250    183200   22.2600  144.7100      14.8        84       931        95
VIS    2025250    183200   22.2600  144.7100      14.8        84       931        95
VIS    2025250    183200   22.2800  144.6700      14.7        88       932        94
VIS    2025250    183200   22.2800  144.6400      14.5        90       922        95
VIS    2025250    183200   22.2800  144.6100      14.2        88       920        95
VIS    2025250    183200   22.2700  144.6000      14.2        87       920        94
VIS    2025250    183200   22.2500  144.5700      14.2        91       920        95
VIS    2025250    183200   22.2500  144.5600      13.9        92       920        96
VIS    2025250    183200   22.2600  144.5100      12.7        94       919        98
VIS    2025250    183200   22.2600  144.4100      13.8        88       912        98
VIS    2025250    183200   22.2700  144.3900      12.6        86       913       100
VIS    2025250    183200   22.2700  144.3700      12.2        85       913        98
VIS    2025250    183200   22.2700  144.3600      12.7        86       915        99
VIS    2025250    183200   22.2700  144.3300      13.0        85       917        99
VIS    2025250    183200   22.2700  144.3100      12.7        84       917        99
VIS    2025250    183200   22.2700  144.2600      11.7        89       920        99
VIS    2025250    183200   22.2500  144.2500      11.7        88       920        98
VIS    2025250    183200   22.2500  144.2200      12.3        90       916        98
VIS    2025250    183200   22.2600  144.1900      12.7        91       915        98
VIS    2025250    183200   22.2500  144.1800      12.8        91       915        98
VIS    2025250    183200   22.2700  144.1400      12.3        90       913        99
VIS    2025250    183200   22.2700  144.1100      12.0        93       913        99
VIS    2025250    183200   22.2700  144.0900      12.1        93       913        95
VIS    2025250    183200   22.2700  144.0800      12.1        93       913        94
VIS    2025250    183200   22.2500  144.0400      12.6        89       916        99
VIS    2025250    183200   22.2700  144.0200      12.2        90       916        98
VIS    2025250    183200   22.2500  144.0100      12.4        87       915        97
VIS    2025250    183200   22.2500  143.9800      12.0        89       914        91
VIS    2025250    183200   22.2500  143.9500      11.6        93       913        95
VIS    2025250    183200   22.2700  143.9100      12.6        93       945        95
VIS    2025250    183200   22.2600  143.8900      12.9        89       945        97
VIS    2025250    183200   22.2500  143.8700      13.3        92       945        97
VIS    2025250    183200   22.2500  143.8600      13.7        93       944        95
VIS    2025250    183200   22.2600  143.8300      14.0        93       920        95
VIS    2025250    183200   22.2500  143.7900      13.2        91       920        97
VIS    2025250    183200   22.2600  143.7800      13.4        91       918        97
VIS    2025250    183200   22.2500  143.7400      13.1        88       916        98
VIS    2025250    183200   22.2500  143.7200      13.0        89       916        98
VIS    2025250    183200   22.2500  143.7100      13.0        89       916        98
VIS    2025250    183200   22.2600  143.6800      13.6        88       915        95
VIS    2025250    183200   22.2700  143.6400      13.5        91       915        97
VIS    2025250    183200   22.2600  143.6300      13.1        90       916        97
VIS    2025250    183200   22.2600  143.6000      12.0        91       916        99
VIS    2025250    183200   22.2500  143.5600      12.2        89       916        99
VIS    2025250    183200   22.2500  143.5500      12.3        90       917        99
VIS    2025250    183200   22.2600  143.5100      12.9        91       915        98
VIS    2025250    183200   22.2600  143.5000      12.9        93       915        98
VIS    2025250    183200   22.2600  143.4700      11.7        95       918        98
VIS    2025250    183200   22.2600  143.4600      10.7        96       920        92
VIS    2025250    183200   22.2500  143.4200       9.8        89       919        95
VIS    2025250    183200   22.2600  143.3900      10.0        86       918        96
VIS    2025250    183200   22.2600  143.3600      10.6        86       915        98
VIS    2025250    183200   22.2600  143.3600      10.5        86       915        98
VIS    2025250    183200   22.2700  143.3400      10.5        86       914        97
VIS    2025250    183200   22.2500  143.3100      10.8        90       913        98
VIS    2025250    183200   22.2600  143.1100       9.5        94       896        95
VIS    2025250    183200   22.2600  143.0600      11.0        86       944        90
VIS    2025250    183200   22.2600  143.0300      10.2        94       946        91
VIS    2025250    183200   22.2400  142.9700      10.5        90       897       100
VIS    2025250    183200   22.2600  142.9400      11.8        85       897        94
VIS    2025250    183200   22.2600  142.9200      12.9        87       897        97
VIS    2025250    183200   22.2600  142.9100      13.1        88       901        97
VIS    2025250    183200   22.2400  142.8300      13.2        91       981        91
VIS    2025250    183200   22.2600  142.7100      11.5        89       983        98
VIS    2025250    183200   22.2400  142.6700      11.3       101       928        96
VIS    2025250    183200   22.2600  142.6600      11.6        95       928        96
VIS    2025250    183200   22.2600  142.6400      11.1        93       928        93
VIS    2025250    183200   22.2600  142.6000      10.3        90       907        92
VIS    2025250    183200   22.2600  142.5700      10.9        88       932        95
VIS    2025250    183200   22.2500  142.5400      11.4        88       932        92
VIS    2025250    183200   22.2500  142.5300      11.5        87       932        94
VIS    2025250    183200   22.2400  142.5100      11.6        86       953        99
VIS    2025250    183200   22.2500  142.4700      11.7        92       948        98
VIS    2025250    183200   22.2600  142.4500      12.0        92       932        97
VIS    2025250    183200   22.2500  142.4400      12.2        90       925        98
VIS    2025250    183200   22.3200  151.5300       5.6        95       985        97
VIS    2025250    183200   22.3200  151.5200       5.6        95       985        97
VIS    2025250    183200   22.3200  151.4500       5.5        97       980        94
VIS    2025250    183200   22.3200  151.4300       5.5        97       954        97
VIS    2025250    183200   22.3300  151.3500       5.3        78       910        96
VIS    2025250    183200   22.3200  151.3300       5.0        69       898        94
VIS    2025250    183200   22.3300  151.3100       6.2        72       861        92
VIS    2025250    183200   22.3200  151.1500       5.4        66       859        90
VIS    2025250    183200   22.3000  150.1100       9.5        97       928        92
VIS    2025250    183200   22.3100  149.9500      11.3       117       880        92
VIS    2025250    183200   22.2900  149.9400      10.7       116       890        92
VIS    2025250    183200   22.2900  149.9000      10.8       115       869        93
VIS    2025250    183200   22.3100  149.8400       9.2       104       873        90
VIS    2025250    183200   22.3100  149.8200       8.0        97       888        97
VIS    2025250    183200   22.2900  149.8000       7.9       100       890        99
VIS    2025250    183200   22.3100  149.7700       8.0        97       903        99
VIS    2025250    183200   22.2900  149.7500       8.1       102       903        99
VIS    2025250    183200   22.3000  149.7300       8.5       105       869        99
VIS    2025250    183200   22.3000  149.2200       8.5        85       989        90
VIS    2025250    183200   22.3000  149.1900       8.4        82       989        94
VIS    2025250    183200   22.3000  149.1800       8.2        81       984        92
VIS    2025250    183200   22.3000  149.1200       8.6        73       939        91
VIS    2025250    183200   22.3000  149.0600       8.5        81       942        93
VIS    2025250    183200   22.2900  149.0200       7.8        72       942        91
VIS    2025250    183200   22.3000  148.9900       8.2        75       956        91
VIS    2025250    183200   22.3000  148.9600       8.4        79       890        90
VIS    2025250    183200   22.2800  148.9100       9.3        83       876        92
VIS    2025250    183200   22.2800  148.8800       9.4        89       876        93
VIS    2025250    183200   22.2800  148.8700       9.4        91       877        92
VIS    2025250    183200   22.2800  148.8500       9.3        94       876        92
VIS    2025250    183200   22.3000  148.8300       9.2        93       870        93
VIS    2025250    183200   22.2800  148.7800       9.1        98       860        93
VIS    2025250    183200   22.2800  148.7600       8.7        95       861        95
VIS    2025250    183200   22.2800  148.7300       8.9        94       867        97
VIS    2025250    183200   22.2800  148.7200       9.3        95       867        96
VIS    2025250    183200   22.3000  148.7000       9.3        95       867        94
VIS    2025250    183200   22.3000  148.6600       8.9        94       867        96
VIS    2025250    183200   22.2800  148.6400       8.6        94       868        97
VIS    2025250    183200   22.3000  148.6000       9.1        93       867        96
VIS    2025250    183200   22.3000  148.5800       9.3        90       866        94
VIS    2025250    183200   22.3000  148.5700       9.4        89       866        94
VIS    2025250    183200   22.2700  148.5400       9.6        84       885        95
VIS    2025250    183200   22.2800  148.5100      10.0        83       897        94
VIS    2025250    183200   22.2700  148.4900       9.8        82       919        96
VIS    2025250    183200   22.2900  148.4500       9.3        81       988        99
VIS    2025250    183200   22.2900  148.4300       9.7        79       988        97
VIS    2025250    183200   22.2700  148.4000       9.8        78       963        97
VIS    2025250    183200   22.2900  148.3900       9.2        77       890        92
VIS    2025250    183200   22.2900  148.3500       9.1        86       884        96
VIS    2025250    183200   22.2900  148.3400       9.2        88       884        96
VIS    2025250    183200   22.2900  148.3100       8.7        87       886        92
VIS    2025250    183200   22.2800  148.2800       8.7        87       886        91
VIS    2025250    183200   22.2700  148.2600       9.0        88       886        96
VIS    2025250    183200   22.2700  148.2400       9.2        87       847        96
VIS    2025250    183200   22.2800  148.1900       9.2        86       841        94
VIS    2025250    183200   22.2700  148.1900       9.2        85       857        95
VIS    2025250    183200   22.2900  148.1600       8.8        84       892        98
VIS    2025250    183200   22.2800  148.1200       9.2        86       962        99
VIS    2025250    183200   22.2900  148.0900       9.8        85       954        96
VIS    2025250    183200   22.2900  148.0700       9.6        84       936        95
VIS    2025250    183200   22.2800  148.0600       9.3        83       909        93
VIS    2025250    183200   22.2800  148.0200       8.7        85       869        90
VIS    2025250    183200   22.2700  147.9400       9.0        88       866        94
VIS    2025250    183200   22.2800  147.8900       8.9        82       875        92
VIS    2025250    183200   22.2600  147.7900       8.9        85       938        99
VIS    2025250    183200   22.2700  147.7600       9.9        86       937       100
VIS    2025250    183200   22.2600  147.7500      10.8        87       929       100
VIS    2025250    183200   22.2600  147.6900       9.5        87       936        99
VIS    2025250    183200   22.2600  147.6600       9.4        85       950        98
VIS    2025250    183200   22.2600  147.6400      10.0        86       950        93
VIS    2025250    183200   22.2700  147.4100      10.2        89       972        99
VIS    2025250    183200   22.2800  147.4000      10.3        88       964        98
VIS    2025250    183200   22.2800  147.3800       9.9        85       964        98
VIS    2025250    183200   22.2600  147.2900       7.0       114       886        90
VIS    2025250    183200   22.2600  147.2600       8.4       106       926        94
VIS    2025250    183200   22.2700  147.2300       8.0        95       948        94
VIS    2025250    183200   22.2800  147.2200       7.6        93       956        93
VIS    2025250    183200   22.2500  146.8200       8.9       103       749        91
VIS    2025250    183200   22.2500  146.4400      10.5        91       878        94
VIS    2025250    183200   22.2500  146.4200      10.7        92       901        97
VIS    2025250    183200   22.2700  146.4200      10.1        92       901        94
VIS    2025250    183200   22.2500  146.3700      10.5        94       902        96
VIS    2025250    183200   22.2600  146.3400      10.5       100       866        91
VIS    2025250    183200   22.2600  146.3400      10.4       100       866        91
VIS    2025250    183200   22.2500  146.3100      10.7        88       901        99
VIS    2025250    183200   22.2600  146.2800      11.2        85       893        98
VIS    2025250    183200   22.2700  146.2500      11.8        84       897        97
VIS    2025250    183200   22.2500  146.2200      13.0        86       905        97
VIS    2025250    183200   22.2500  146.2000      12.9        88       908        97
VIS    2025250    183200   22.2700  146.1800      13.2        88       907        98
VIS    2025250    183200   22.2500  146.1600      12.2        91       910        99
VIS    2025250    183200   22.2700  146.1200      11.2        93       908       100
VIS    2025250    183200   22.2500  146.0900      10.8        90       918        99
VIS    2025250    183200   22.2400  146.0800      10.3        87       933        97
VIS    2025250    183200   22.2600  146.0600      10.6        86       953        97
VIS    2025250    183200   22.2500  146.0200       9.7        76       978        95
VIS    2025250    183200   22.2500  145.9900       9.8        83       964        95
VIS    2025250    183200   22.2400  145.8700      13.8        82       966        98
VIS    2025250    183200   22.2600  145.8600      14.3        81       986        98
VIS    2025250    183200   22.2600  145.8400      13.8        83       936        98
VIS    2025250    183200   22.2500  145.7900      11.0        85       928        97
VIS    2025250    183200   22.2500  145.7900      10.8        85       933        95
VIS    2025250    183200   22.2600  145.7500      13.8        83       935        94
VIS    2025250    183200   22.2600  145.7300      15.0        82       936        93
VIS    2025250    183200   22.2600  145.6900      13.2        81       935        91
VIS    2025250    183200   22.2400  145.6400      13.7        82       941        98
VIS    2025250    183200   22.2400  145.6300      13.8        82       941        98
VIS    2025250    183200   22.2400  145.6100      14.6        81       949        98
VIS    2025250    183200   22.2400  145.3700      12.6        77       990        90
VIS    2025250    183200   22.2600  145.3400      13.8        83       972        97
VIS    2025250    183200   22.2400  145.3100      14.0        81       935        97
VIS    2025250    183200   22.2500  145.2900      14.5        84       928        97
VIS    2025250    183200   22.2600  145.2800      14.6        85       929        97
VIS    2025250    183200   22.2600  145.1600      12.5        85       966        98
VIS    2025250    183200   22.2500  145.1200      13.5        87       966        99
VIS    2025250    183200   22.2500  145.1000      13.6        87       942        98
VIS    2025250    183200   22.2500  145.0800      13.8        87       928        97
VIS    2025250    183200   22.2500  145.0600      14.2        88       922        96
VIS    2025250    183200   22.2500  145.0200      14.3        87       919        96
VIS    2025250    183200   22.2400  144.9900      13.9        85       931        98
VIS    2025250    183200   22.2500  144.9800      14.0        84       931        98
VIS    2025250    183200   22.2500  144.9400      14.4        86       935        96
VIS    2025250    183200   22.2500  144.9300      14.6        87       935        95
VIS    2025250    183200   22.2500  144.8900      15.0        87       925        94
VIS    2025250    183200   22.2400  144.8600      15.7        88       928        94
VIS    2025250    183200   22.2400  144.8600      15.8        88       928        93
VIS    2025250    183200   22.2400  144.8100      16.0        90       937        93
VIS    2025250    183200   22.2500  144.8000      15.9        90       937        93
VIS    2025250    183200   22.2300  144.7600      14.5        84       936        95
VIS    2025250    183200   22.2400  144.7500      14.2        85       933        96
VIS    2025250    183200   22.2400  144.7300      14.4        83       931        97
VIS    2025250    183200   22.2400  144.6900      15.1        88       923        95
VIS    2025250    183200   22.2500  144.6800      14.9        88       923        94
VIS    2025250    183200   22.2300  144.6500      15.0        88       920        95
VIS    2025250    183200   22.2300  144.6300      15.1        88       919        94
VIS    2025250    183200   22.2300  144.5900      14.2        89       919        93
VIS    2025250    183200   22.2400  144.5600      13.9        92       919        91
VIS    2025250    183200   22.2500  144.5600      13.9        92       919        93
VIS    2025250    183200   22.2400  144.4300      13.5        88       901        95
VIS    2025250    183200   22.2300  144.3900      11.5        85       912        97
VIS    2025250    183200   22.2300  144.3800      11.4        85       912        97
VIS    2025250    183200   22.2400  144.3400      12.9        85       916        97
VIS    2025250    183200   22.2500  144.3200      13.7        85       915        97
VIS    2025250    183200   22.2500  144.3100      13.0        84       917        99
VIS    2025250    183200   22.2400  144.2700      11.8        88       920        99
VIS    2025250    183200   22.2500  144.2600      11.9        88       920        99
VIS    2025250    183200   22.2500  144.2100      12.8        91       916        99
VIS    2025250    183200   22.2400  144.1900      12.8        92       915        98
VIS    2025250    183200   22.2300  144.1800      12.6        92       910        98
VIS    2025250    183200   22.2300  144.1400      11.8        92       914        98
VIS    2025250    183200   22.2400  144.1100      12.3        89       916        98
VIS    2025250    183200   22.2400  144.1000      12.4        89       916        98
VIS    2025250    183200   22.2400  144.0700      12.9        89       917        96
VIS    2025250    183200   22.2400  144.0500      13.0        89       917        99
VIS    2025250    183200   22.2300  144.0200      12.7        88       916        99
VIS    2025250    183200   22.2400  143.9400      11.3        89       909        99
VIS    2025250    183200   22.2300  143.9300      12.1        82       910        92
VIS    2025250    183200   22.2400  143.8900      12.8        87       945        97
VIS    2025250    183200   22.2300  143.8800      12.8        87       971        97
VIS    2025250    183200   22.2200  143.8500      13.3        88       959        97
VIS    2025250    183200   22.2300  143.8100      12.9        89       921        97
VIS    2025250    183200   22.2300  143.8000      12.8        90       921        97
VIS    2025250    183200   22.2300  143.7600      12.9        90       919        98
VIS    2025250    183200   22.2400  143.7400      13.0        88       916        98
VIS    2025250    183200   22.2300  143.7100      13.0        89       916        98
VIS    2025250    183200   22.2400  143.7100      13.0        89       916        98
VIS    2025250    183200   22.2400  143.6700      13.5        88       918        96
VIS    2025250    183200   22.2300  143.6400      13.1        89       915        96
VIS    2025250    183200   22.2200  143.6200      12.1        90       914        95
VIS    2025250    183200   22.2200  143.6100      11.7        90       914        96
VIS    2025250    183200   22.2200  143.5600      12.0        92       918        99
VIS    2025250    183200   22.2300  143.5400      12.0        92       918        99
VIS    2025250    183200   22.2300  143.5300      11.9        93       918        98
VIS    2025250    183200   22.2300  143.4900      11.0        93       919        95
VIS    2025250    183200   22.2400  143.4800      11.1        91       919        97
VIS    2025250    183200   22.2300  143.4400      10.5        87       920        97
VIS    2025250    183200   22.2400  143.4200       9.8        89       919        96
VIS    2025250    183200   22.2300  143.4000      10.0        87       917        93
VIS    2025250    183200   22.2200  143.3800      10.3        87       915        96
VIS    2025250    183200   22.2300  143.3400      10.3        87       914        99
VIS    2025250    183200   22.2300  143.3300      10.1        89       914        99
VIS    2025250    183200   22.2400  143.0900      10.2        85       881        98
VIS    2025250    183200   22.2200  143.0500      10.8        86       892        96
VIS    2025250    183200   22.2200  143.0100       9.3        85       895        96
VIS    2025250    183200   22.2200  142.9900       9.8        90       904        99
VIS    2025250    183200   22.2300  142.9800      10.1        91       897        98
VIS    2025250    183200   22.2300  142.9600      10.8        90       896        99
VIS    2025250    183200   22.2300  142.9200      12.5        87       913        97
VIS    2025250    183200   22.2200  142.9100      12.4        88       933        99
VIS    2025250    183200   22.2200  142.8700      12.2        89       967       100
VIS    2025250    183200   22.2200  142.8500      11.8        89       958        99
VIS    2025250    183200   22.2400  142.8400      12.7        91       979        95
VIS    2025250    183200   22.2300  142.8100      10.5        92       985        94
VIS    2025250    183200   22.2100  142.7700      10.6        91       956        99
VIS    2025250    183200   22.2300  142.7500      10.8        84       956        99
VIS    2025250    183200   22.2100  142.6200       9.3        97       907        96
VIS    2025250    183200   22.2200  142.6000       9.2        96       906        96
VIS    2025250    183200   22.2300  142.5800       9.4        91       906        91
VIS    2025250    183200   22.2300  142.5500      10.8        89       916        93
VIS    2025250    183200   22.2300  142.5200      11.4        86       933        98
VIS    2025250    183200   22.2200  142.5100      11.3        86       933        97
VIS    2025250    183200   22.2100  142.4900      10.9        85       935        98
VIS    2025250    183200   22.2100  142.4400      12.3        88       934        98
VIS    2025250    183200   22.2300  142.4300      12.7        90       924        98
VIS    2025250    183200   22.3000  151.5300       5.4        88       985        93
VIS    2025250    183200   22.3000  151.5200       5.0        88       979        96
VIS    2025250    183200   22.2900  151.4800       5.2        92       963        98
VIS    2025250    183200   22.2900  151.4500       4.8        84       947        98
VIS    2025250    183200   22.3100  151.4400       5.3        96       947        97
VIS    2025250    183200   22.3000  151.3500       4.2        67       923        92
VIS    2025250    183200   22.3100  151.3400       4.5        69       910        94
VIS    2025250    183200   22.3100  151.3100       6.0        69       861        90
VIS    2025250    183200   22.3000  151.0900       5.3        72       857        90
VIS    2025250    183200   22.2900  150.1700       9.1        99       927        93
VIS    2025250    183200   22.2900  150.1500       9.3        98       931        92
VIS    2025250    183200   22.2900  150.1100       9.4        97       926        93
VIS    2025250    183200   22.2700  150.0900       9.5        98       930        91
VIS    2025250    183200   22.2700  150.0700       9.5       103       924        92
VIS    2025250    183200   22.2800  149.9500      10.6       113       900        92
VIS    2025250    183200   22.2800  149.9300      10.4       113       898        93
VIS    2025250    183200   22.2900  149.9100      10.7       115       870        94
VIS    2025250    183200   22.2900  149.9000      10.7       115       869        94
VIS    2025250    183200   22.2700  149.8500      11.0       118       870        95
VIS    2025250    183200   22.2700  149.8300      10.5       117       870        96
VIS    2025250    183200   22.2900  149.8000       7.9        99       890        98
VIS    2025250    183200   22.2900  149.7900       7.8        98       899        98
VIS    2025250    183200   22.2900  149.7500       8.2       104       896        98
VIS    2025250    183200   22.2700  149.7300       8.4       109       918        91
VIS    2025250    183200   22.2800  149.7100       8.5       104       869        98
VIS    2025250    183200   22.2600  149.2100       8.6        73       979        92
VIS    2025250    183200   22.2600  149.1700       8.5        79       947        91
VIS    2025250    183200   22.2600  149.0800       9.1        74       897        90
VIS    2025250    183200   22.2700  149.0400       7.7        70       913        92
VIS    2025250    183200   22.2600  148.9400       8.5        78       876        93
VIS    2025250    183200   22.2600  148.9200       9.0        83       875        93
VIS    2025250    183200   22.2500  148.8900       9.3        87       872        92
VIS    2025250    183200   22.2700  148.8700       9.4        92       876        92
VIS    2025250    183200   22.2700  148.8600       9.4        94       876        92
VIS    2025250    183200   22.2600  148.8100       9.8        99       860        90
VIS    2025250    183200   22.2600  148.7900       9.5        99       859        92
VIS    2025250    183200   22.2500  148.7700       8.9        97       861        94
VIS    2025250    183200   22.2500  148.7500       8.8        94       863        95
VIS    2025250    183200   22.2500  148.7200       9.5        94       869        96
VIS    2025250    183200   22.2700  148.7000       9.2        97       868        95
VIS    2025250    183200   22.2500  148.6600       8.6        96       868        97
VIS    2025250    183200   22.2600  148.6400       8.6        95       868        97
VIS    2025250    183200   22.2500  148.6200       8.7        94       868        97
VIS    2025250    183200   22.2700  148.5800       9.3        92       867        94
VIS    2025250    183200   22.2500  148.5700       9.2        89       868        94
VIS    2025250    183200   22.2500  148.5300       9.1        85       890        96
VIS    2025250    183200   22.2500  148.5200       9.2        85       897        98
VIS    2025250    183200   22.2500  148.5000       9.6        85       919        96
VIS    2025250    183200   22.2600  148.4700       9.8        81       963       100
VIS    2025250    183200   22.2600  148.4300       9.6        81       985        98
VIS    2025250    183200   22.2500  148.4100       9.7        81       985       100
VIS    2025250    183200   22.2700  148.3900       9.9        79       962        97
VIS    2025250    183200   22.2500  148.3200       8.7        91       889        98
VIS    2025250    183200   22.2500  148.3200       8.7        91       889        98
VIS    2025250    183200   22.2500  148.2800       9.2        86       891        97
VIS    2025250    183200   22.2500  148.2600       9.1        85       887        97
VIS    2025250    183200   22.2500  148.2300       9.1        84       857        93
VIS    2025250    183200   22.2500  148.2200       9.1        84       857        95
VIS    2025250    183200   22.2500  148.1700       8.9        85       939        93
VIS    2025250    183200   22.2600  148.1700       8.9        85       939        95
VIS    2025250    183200   22.2500  148.1400       8.8        84       964        96
VIS    2025250    183200   22.2400  148.1000       9.3        83       956        98
VIS    2025250    183200   22.2500  148.0900       9.4        83       956        98
VIS    2025250    183200   22.2600  148.0700       9.2        82       936        94
VIS    2025250    183200   22.2600  148.0300       8.5        82       878        90
VIS    2025250    183200   22.2400  148.0000       9.7        80       868        91
VIS    2025250    183200   22.2500  147.9700      10.1        84       869        92
VIS    2025250    183200   22.2500  147.9500       9.7        83       879        95
VIS    2025250    183200   22.2600  147.7900       8.7        86       938        97
VIS    2025250    183200   22.2600  147.7700      10.3        86       938        99
VIS    2025250    183200   22.2600  147.6800       9.2        86       942        98
VIS    2025250    183200   22.2500  147.6600       9.6        87       950        90
VIS    2025250    183200   22.2500  147.6300      10.4        89       950        92
VIS    2025250    183200   22.2500  147.5600      10.5        88       972        90
VIS    2025250    183200   22.2400  147.5500      10.4        87       972        92
VIS    2025250    183200   22.2400  147.4800       9.4        86       993        95
VIS    2025250    183200   22.2300  147.4800      10.6        87       996        98
VIS    2025250    183200   22.2300  147.4300      11.3        86       977        98
VIS    2025250    183200   22.2300  147.4100       9.9        86       962        91
VIS    2025250    183200   22.2400  147.4000       9.7        86       962        94
VIS    2025250    183200   22.2400  147.3700       8.3        84       949        93
VIS    2025250    183200   22.2300  147.3500       7.2        87       911        95
VIS    2025250    183200   22.2400  147.2700       7.6       104       884        98
VIS    2025250    183200   22.2400  147.2400       7.4        90       915        93
VIS    2025250    183200   22.2500  146.8500       7.7       108       707        91
VIS    2025250    183200   22.2400  146.8300       9.0       101       776        91
VIS    2025250    183200   22.2400  146.5500      11.2        97       778        90
VIS    2025250    183200   22.2300  146.4700      11.5        90       878        95
VIS    2025250    183200   22.2300  146.4700      11.5        90       878        95
VIS    2025250    183200   22.2400  146.4300      11.0        92       901        98
VIS    2025250    183200   22.2200  146.4100      12.1        88       908        97
VIS    2025250    183200   22.2300  146.3800      11.5        87       906        98
VIS    2025250    183200   22.2300  146.3500      10.6        86       906        99
VIS    2025250    183200   22.2300  146.3300      10.9        87       906        99
VIS    2025250    183200   22.2300  146.3000      11.0        88       903        99
VIS    2025250    183200   22.2200  146.2900      11.1        87       903        99
VIS    2025250    183200   22.2200  146.2700      11.9        84       905        98
VIS    2025250    183200   22.2300  146.2400      12.8        85       905        90
VIS    2025250    183200   22.2400  146.2200      13.2        86       908        93
VIS    2025250    183200   22.2300  146.1700      12.1        89       915        99
VIS    2025250    183200   22.2200  146.1500      11.0        88       918        95
VIS    2025250    183200   22.2200  146.1400      11.0        89       918        95
VIS    2025250    183200   22.2200  146.1000      10.3        90       927        98
VIS    2025250    183200   22.2400  146.0900      10.2        88       928        97
VIS    2025250    183200   22.2300  146.0600      10.4        83       953        95
VIS    2025250    183200   22.2400  146.0300      10.1        77       978        96
VIS    2025250    183200   22.2300  146.0100       9.8        79       963        94
VIS    2025250    183200   22.2200  145.8900      12.9        84       971        99
VIS    2025250    183200   22.2200  145.8700      12.9        83       966       100
VIS    2025250    183200   22.2300  145.8600      13.6        81       966       100
VIS    2025250    183200   22.2200  145.8300      12.3        82       934        96
VIS    2025250    183200   22.2200  145.8000      11.7        80       935        97
VIS    2025250    183200   22.2300  145.7900      11.1        81       935        93
VIS    2025250    183200   22.2400  145.7500      13.4        83       933        95
VIS    2025250    183200   22.2300  145.7300      14.4        83       933        97
VIS    2025250    183200   22.2100  145.6900      15.5        87       935        95
VIS    2025250    183200   22.2300  145.6700      14.2        83       941        97
VIS    2025250    183200   22.2200  145.6500      13.3        81       941        99
VIS    2025250    183200   22.2300  145.6300      13.6        80       941        99
VIS    2025250    183200   22.2100  145.4200      11.3        84       994        94
VIS    2025250    183200   22.2300  145.3800      11.8        79       990        91
VIS    2025250    183200   22.2200  145.3400      14.1        77       955        99
VIS    2025250    183200   22.2300  145.3300      13.9        77       948        99
VIS    2025250    183200   22.2100  145.2800      13.2        80       938        99
VIS    2025250    183200   22.2200  145.1500      14.2        88       996        93
VIS    2025250    183200   22.2300  145.1100      14.0        86       957        96
VIS    2025250    183200   22.2100  145.0900      14.2        86       947        96
VIS    2025250    183200   22.2200  145.0500      13.9        88       916        97
VIS    2025250    183200   22.2100  145.0200      13.2        88       926        97
VIS    2025250    183200   22.2200  145.0100      13.3        87       926        99
VIS    2025250    183200   22.2300  144.9900      13.7        87       938        98
VIS    2025250    183200   22.2300  144.9500      14.5        89       940        96
VIS    2025250    183200   22.2100  144.9200      14.7        90       934        96
VIS    2025250    183200   22.2100  144.9100      14.7        88       930        96
VIS    2025250    183200   22.2100  144.8900      14.9        88       930        96
VIS    2025250    183200   22.2300  144.8500      15.9        88       933        93
VIS    2025250    183200   22.2200  144.8400      16.0        88       933        93
VIS    2025250    183200   22.2100  144.8000      15.6        85       945        95
VIS    2025250    183200   22.2300  144.7800      15.0        85       937        95
VIS    2025250    183200   22.2200  144.7600      14.6        83       936        96
VIS    2025250    183200   22.2100  144.7300      15.0        86       930        96
VIS    2025250    183200   22.2000  144.7100      15.2        88       928        96
VIS    2025250    183200   22.2000  144.6700      15.1        92       923        95
VIS    2025250    183200   22.2200  144.6500      15.2        89       920        95
VIS    2025250    183200   22.2100  144.6200      14.9        90       918        95
VIS    2025250    183200   22.2000  144.5900      13.1        96       916        90
VIS    2025250    183200   22.2200  144.5800      14.1        90       919        91
VIS    2025250    183200   22.2200  144.4500      10.4        97       890        95
VIS    2025250    183200   22.2200  144.4200      11.4        86       896        97
VIS    2025250    183200   22.2200  144.4000      11.4        86       908        95
VIS    2025250    183200   22.2100  144.3800      10.6        89       912        95
VIS    2025250    183200   22.2100  144.3400      12.2        89       915        93
VIS    2025250    183200   22.2100  144.2500      13.1        99       901        90
VIS    2025250    183200   22.2100  144.2300      13.1        98       885        93
VIS    2025250    183200   22.2200  144.2000      12.8        93       910        97
VIS    2025250    183200   22.2200  144.1900      12.7        92       910        98
VIS    2025250    183200   22.2100  144.1500      11.5        91       904        95
VIS    2025250    183200   22.2200  144.1400      11.7        92       912        98
VIS    2025250    183200   22.2100  144.1100      12.2        87       914        96
VIS    2025250    183200   22.2100  144.0900      12.5        86       917        98
VIS    2025250    183200   22.2000  144.0400      13.0        88       919        99
VIS    2025250    183200   22.2000  144.0400      13.2        89       919        99
VIS    2025250    183200   22.2000  144.0000      13.2        88       916        90
VIS    2025250    183200   22.2000  143.9900      12.7        89       913        90
VIS    2025250    183200   22.2000  143.9600      12.6        89       916        94
VIS    2025250    183200   22.2100  143.9300      12.7        88       915        99
VIS    2025250    183200   22.2000  143.8900      12.8        85       943       100
VIS    2025250    183200   22.2100  143.8900      12.9        86       964        99
VIS    2025250    183200   22.2000  143.8500      13.4        84       977        95
VIS    2025250    183200   22.2100  143.8000      12.6        89       921        94
VIS    2025250    183200   22.2200  143.7900      12.7        89       921        98
VIS    2025250    183200   22.2000  143.7600      13.1        90       912        96
VIS    2025250    183200   22.2200  143.7200      13.3        89       913        96
VIS    2025250    183200   22.2100  143.7200      13.1        88       908        96
VIS    2025250    183200   22.2200  143.6700      12.4        89       919        98
VIS    2025250    183200   22.2100  143.6500      12.7        90       915        97
VIS    2025250    183200   22.2200  143.6200      12.2        89       914        95
VIS    2025250    183200   22.2100  143.6000      11.6        90       913        96
VIS    2025250    183200   22.2100  143.5900      11.6        90       917        97
VIS    2025250    183200   22.2200  143.5700      12.0        92       917        99
VIS    2025250    183200   22.1900  143.5200      10.4        88       911        95
VIS    2025250    183200   22.2200  143.5000      10.5        94       919        91
VIS    2025250    183200   22.2000  143.4800      10.3        91       916        93
VIS    2025250    183200   22.2000  143.4500      11.0        83       913        96
VIS    2025250    183200   22.2100  143.4300      10.6        84       913        97
VIS    2025250    183200   22.2100  143.4200       9.8        86       913        93
VIS    2025250    183200   22.1900  143.3700       9.2        89       881        95
VIS    2025250    183200   22.2100  143.3500      10.1        88       909        98
VIS    2025250    183200   22.2000  143.3300      10.1        89       909        99
VIS    2025250    183200   22.1900  143.1300      10.5        91       896        97
VIS    2025250    183200   22.1900  143.1200      10.9        95       897        98
VIS    2025250    183200   22.2000  143.0800      10.7        87       892        97
VIS    2025250    183200   22.1900  143.0500      11.4        86       897        96
VIS    2025250    183200   22.2000  143.0200      11.1        88       906        97
VIS    2025250    183200   22.2100  143.0000      10.8        91       906        99
VIS    2025250    183200   22.2000  142.9700      11.4        94       906        99
VIS    2025250    183200   22.2000  142.9600      11.1        94       906        99
VIS    2025250    183200   22.2100  142.9300      12.2        90       911        98
VIS    2025250    183200   22.2100  142.9100      12.3        88       917        98
VIS    2025250    183200   22.2000  142.8800      11.5        88       963        99
VIS    2025250    183200   22.2100  142.8500      11.4        89       958        98
VIS    2025250    183200   22.2000  142.8300       9.9        92       958        92
VIS    2025250    183200   22.2000  142.8200       9.3        92       958        95
VIS    2025250    183200   22.2000  142.7800      10.6        93       917       100
VIS    2025250    183200   22.2100  142.7700      10.6        92       956        99
VIS    2025250    183200   22.1900  142.7300       9.7        92       874        92
VIS    2025250    183200   22.2100  142.7000      10.3       102       914        95
VIS    2025250    183200   22.2100  142.7000      10.5       104       914        93
VIS    2025250    183200   22.1900  142.6300       9.6        98       909        96
VIS    2025250    183200   22.2100  142.6000       9.0        97       909        96
VIS    2025250    183200   22.2000  142.6000       8.9        97       910        97
VIS    2025250    183200   22.1900  142.5700       9.1        96       916        97
VIS    2025250    183200   22.2000  142.5400      10.6        91       917        98
VIS    2025250    183200   22.1900  142.5200       9.9        91       918        96
VIS    2025250    183200   22.2100  142.4800      10.8        86       932        98
VIS    2025250    183200   22.2000  142.4700      11.1        85       932        98
VIS    2025250    183200   22.2100  142.4400      12.1        87       934        98
VIS    2025250    183200   22.2700  151.5600       6.1        77       979        97
VIS    2025250    183200   22.2700  151.5300       5.8        83       942        97
VIS    2025250    183200   22.2700  151.5100       5.4        87       942        99
VIS    2025250    183200   22.2700  151.4900       5.5        87       942        99
VIS    2025250    183200   22.2900  151.4500       4.9        83       904        98
VIS    2025250    183200   22.2800  151.4400       4.6        74       901        90
VIS    2025250    183200   22.2700  151.3500       5.2        85       981        98
VIS    2025250    183200   22.2700  151.3300       5.5        84       923        97
VIS    2025250    183200   22.2700  151.1400       5.4        61       887        90
VIS    2025250    183200   22.2800  151.1100       5.6        72       857        91
VIS    2025250    183200   22.2600  150.1700       9.2       105       907        98
VIS    2025250    183200   22.2500  150.1400       9.1       100       904        98
VIS    2025250    183200   22.2700  150.1200       9.3        96       920        94
VIS    2025250    183200   22.2500  150.1000       9.5        96       911        96
VIS    2025250    183200   22.2500  150.0900       9.4        98       914        96
VIS    2025250    183200   22.2500  149.9600      10.5       101       911        90
VIS    2025250    183200   22.2500  149.9200      10.8       112       898        94
VIS    2025250    183200   22.2400  149.8900      10.7       112       880        96
VIS    2025250    183200   22.2400  149.8700      10.4       113       872        92
VIS    2025250    183200   22.2600  149.8600      11.1       118       870        94
VIS    2025250    183200   22.2600  149.8100       9.1       110       871        98
VIS    2025250    183200   22.2600  149.8100       8.8       107       871        98
VIS    2025250    183200   22.2400  149.7600       8.1       101       928        96
VIS    2025250    183200   22.2600  149.7400       8.3       107       927        90
VIS    2025250    183200   22.2500  149.7100       8.5       107       880        95
VIS    2025250    183200   22.2400  149.2100       8.6        74       975        96
VIS    2025250    183200   22.2400  149.1900       8.8        75       969        94
VIS    2025250    183200   22.2300  149.1500       8.6        80       900        93
VIS    2025250    183200   22.2400  149.1000       8.6        74       891        91
VIS    2025250    183200   22.2400  149.0900       8.8        74       884        90
VIS    2025250    183200   22.2400  149.0600       8.3        73       895        93
VIS    2025250    183200   22.2300  149.0200       7.8        72       913        91
VIS    2025250    183200   22.2300  148.9300       8.7        82       865        94
VIS    2025250    183200   22.2500  148.9000       9.2        87       872        93
VIS    2025250    183200   22.2500  148.8000       9.6       100       860        91
VIS    2025250    183200   22.2400  148.7900       9.5       100       863        92
VIS    2025250    183200   22.2300  148.7600       9.0        97       863        94
VIS    2025250    183200   22.2300  148.7300       9.4        94       873        98
VIS    2025250    183200   22.2300  148.6900       9.1        97       873        98
VIS    2025250    183200   22.2500  148.6700       8.6        97       872        97
VIS    2025250    183200   22.2500  148.6600       8.6        96       868        97
VIS    2025250    183200   22.2400  148.6300       8.6        95       870        96
VIS    2025250    183200   22.2300  148.6000       8.6        92       872        93
VIS    2025250    183200   22.2200  148.5800       8.6        91       872        93
VIS    2025250    183200   22.2400  148.5600       9.1        87       871        94
VIS    2025250    183200   22.2400  148.5300       8.9        86       878        96
VIS    2025250    183200   22.2300  148.5100       9.1        88       897        94
VIS    2025250    183200   22.2300  148.4600       9.9        83       925        97
VIS    2025250    183200   22.2200  148.4600       9.8        83       924        96
VIS    2025250    183200   22.2400  148.4100       9.6        82       985       100
VIS    2025250    183200   22.2400  148.3200       8.8        91       895        98
VIS    2025250    183200   22.2300  148.3100       9.1        88       922        98
VIS    2025250    183200   22.2300  148.2700       9.6        82       895        94
VIS    2025250    183200   22.2200  148.2400       9.3        82       891        96
VIS    2025250    183200   22.2400  148.2300       9.0        83       857        93
VIS    2025250    183200   22.2400  148.2000       8.9        82       880        94
VIS    2025250    183200   22.2400  148.1800       8.7        83       911        93
VIS    2025250    183200   22.2200  148.1400       9.0        81       963        93
VIS    2025250    183200   22.2400  148.1100       9.2        84       956        98
VIS    2025250    183200   22.2400  148.0900       9.2        83       956        97
VIS    2025250    183200   22.2300  148.0800       9.1        83       930        94
VIS    2025250    183200   22.2200  148.0500       9.3        84       865        92
VIS    2025250    183200   22.2200  148.0100       9.7        80       865        92
VIS    2025250    183200   22.2200  147.9800      10.2        81       879        93
VIS    2025250    183200   22.2200  147.9500      10.1        81       905        96
VIS    2025250    183200   22.2200  147.9500      10.0        80       905        96
VIS    2025250    183200   22.2200  147.9200       9.3        77       950        95
VIS    2025250    183200   22.2200  147.8700       9.3        81       992        94
VIS    2025250    183200   22.2100  147.8400      10.3        88       985        98
VIS    2025250    183200   22.2100  147.8100      10.8        88       976        98
VIS    2025250    183200   22.2100  147.8000      10.8        88       966        98
VIS    2025250    183200   22.2200  147.6500      10.2        89       974        94
VIS    2025250    183200   22.2100  147.6300      10.3        91       966        91
VIS    2025250    183200   22.2100  147.6100       9.9        92       943        90
VIS    2025250    183200   22.2200  147.5900       9.8        92       952        92
VIS    2025250    183200   22.2300  147.5500      10.2        89       972        93
VIS    2025250    183200   22.2300  147.5400      10.3        88       972        93
VIS    2025250    183200   22.2100  147.5000      10.5        90       996        98
VIS    2025250    183200   22.2100  147.4700      11.9        88       994        99
VIS    2025250    183200   22.2200  147.4500      11.5        86       982        98
VIS    2025250    183200   22.2200  147.4400      11.2        87       962        97
VIS    2025250    183200   22.2200  147.4100       9.9        86       956        90
VIS    2025250    183200   22.2300  147.3900       9.1        87       949        91
VIS    2025250    183200   22.2300  147.3600       7.7        88       911        95
VIS    2025250    183200   22.2200  147.3300       6.9        94       894        94
VIS    2025250    183200   22.2100  147.3000       7.6        91       897        96
VIS    2025250    183200   22.2200  147.2900       7.9        93       897        96
VIS    2025250    183200   22.2200  147.2600       7.2        92       881        95
VIS    2025250    183200   22.2100  146.8600       7.7       106       785        94
VIS    2025250    183200   22.2200  146.8300       8.9        98       785        90
VIS    2025250    183200   22.2100  146.8100       8.8        95       865        92
VIS    2025250    183200   22.2100  146.6700       8.7        86       737        90
VIS    2025250    183200   22.2200  146.6600       8.7        86       743        90
VIS    2025250    183200   22.2000  146.6100       9.0        98       732        92
VIS    2025250    183200   22.2100  146.4900      11.6        90       813        90
VIS    2025250    183200   22.2100  146.4400      11.8        87       910        99
VIS    2025250    183200   22.2000  146.4300      12.1        87       910        99
VIS    2025250    183200   22.2200  146.3900      11.9        86       908        98
VIS    2025250    183200   22.2000  146.3600      11.3        86       923        96
VIS    2025250    183200   22.2000  146.3600      11.1        87       923        96
VIS    2025250    183200   22.2200  146.3100      11.0        88       905        98
VIS    2025250    183200   22.2000  146.3100      11.3        90       906        97
VIS    2025250    183200   22.1900  146.2600      12.3        81       905        92
VIS    2025250    183200   22.2100  146.1900      11.5        91       910        91
VIS    2025250    183200   22.2100  146.1700      11.1        87       918        94
VIS    2025250    183200   22.2100  146.1500      11.1        87       918        95
VIS    2025250    183200   22.2000  146.1200      11.1        90       923        94
VIS    2025250    183200   22.2100  146.0900      11.1        88       928        98
VIS    2025250    183200   22.2100  146.0600      11.4        82       948        99
VIS    2025250    183200   22.2000  146.0300      10.8        79       951        98
VIS    2025250    183200   22.2000  146.0200      10.5        81       953        97
VIS    2025250    183200   22.2000  145.9900      11.5        86       947        93
VIS    2025250    183200   22.1900  145.9400      13.2        89       964        98
VIS    2025250    183200   22.1900  145.9100      11.5        84       984        98
VIS    2025250    183200   22.1900  145.8800      11.5        86       966        98
VIS    2025250    183200   22.2100  145.8700      12.6        84       966       100
VIS    2025250    183200   22.2100  145.8500      12.6        83       962        98
VIS    2025250    183200   22.2000  145.8300      12.1        83       958        94
VIS    2025250    183200   22.2100  145.8000      11.6        80       940        97
VIS    2025250    183200   22.2000  145.7800      12.3        80       938        95
VIS    2025250    183200   22.2000  145.7400      14.4        83       932        97
VIS    2025250    183200   22.1900  145.7100      14.9        86       934        96
VIS    2025250    183200   22.1900  145.6900      14.9        86       935        97
VIS    2025250    183200   22.2100  145.6600      13.5        82       939        99
VIS    2025250    183200   22.2000  145.6500      13.3        82       940       100
VIS    2025250    183200   22.2100  145.4200      11.5        84       994        95
VIS    2025250    183200   22.2100  145.4100      10.8        84       994        94
VIS    2025250    183200   22.2100  145.3900      11.3        80       989        91
VIS    2025250    183200   22.2000  145.3200      13.8        77       955        99
VIS    2025250    183200   22.1900  145.3000      12.8        81       952        99
VIS    2025250    183200   22.1900  145.1100      14.5        86       989        93
VIS    2025250    183200   22.2000  145.1000      14.3        86       957        95
VIS    2025250    183200   22.1800  145.0700      14.2        89       957        95
VIS    2025250    183200   22.1800  145.0300      12.8        88       944        96
VIS    2025250    183200   22.1900  145.0300      12.8        88       928        96
VIS    2025250    183200   22.2000  145.0000      13.2        89       944        97
VIS    2025250    183200   22.1900  144.9600      14.1        89       944        96
VIS    2025250    183200   22.1800  144.9300      14.5        90       936        96
VIS    2025250    183200   22.1800  144.9200      14.6        89       934        96
VIS    2025250    183200   22.1800  144.9000      14.9        87       931        96
VIS    2025250    183200   22.2000  144.8700      15.4        87       930        95
VIS    2025250    183200   22.1900  144.8400      15.9        90       941        93
VIS    2025250    183200   22.1900  144.8300      15.9        88       941        93
VIS    2025250    183200   22.1800  144.8000      15.3        86       946        95
VIS    2025250    183200   22.2000  144.7800      15.1        85       942        96
VIS    2025250    183200   22.1900  144.7400      15.1        87       934        96
VIS    2025250    183200   22.2000  144.7200      15.1        87       928        96
VIS    2025250    183200   22.1900  144.6900      14.8        92       925        95
VIS    2025250    183200   22.2000  144.6800      15.0        93       923        95
VIS    2025250    183200   22.1800  144.6500      14.5        87       919        95
VIS    2025250    183200   22.1900  144.6100      14.4        87       917        95
VIS    2025250    183200   22.1800  144.4300      10.7        94       880        96
VIS    2025250    183200   22.1800  144.4100      10.2        94       885        96
VIS    2025250    183200   22.2000  144.3900      10.2        90       901        94
VIS    2025250    183200   22.1800  144.3600      10.6       101       894        96
VIS    2025250    183200   22.2000  144.3400      12.3        92       906        94
VIS    2025250    183200   22.1800  144.3300      10.2       103       894        95
VIS    2025250    183200   22.1900  144.2300      12.8       100       878        93
VIS    2025250    183200   22.1900  144.2100      12.9        98       881        93
VIS    2025250    183200   22.2000  144.1900      12.6        95       885        95
VIS    2025250    183200   22.1700  144.1700      12.5        92       895        92
VIS    2025250    183200   22.1900  144.1500      11.7        92       895        91
VIS    2025250    183200   22.1700  144.1200      11.9        86       907        96
VIS    2025250    183200   22.1800  144.0900      12.6        86       918        95
VIS    2025250    183200   22.1900  144.0600      12.7        87       918        98
VIS    2025250    183200   22.1900  144.0500      13.0        88       918        99
VIS    2025250    183200   22.1900  144.0100      13.5        90       916        93
VIS    2025250    183200   22.1800  143.9900      13.0        90       916        94
VIS    2025250    183200   22.1900  143.9800      12.7        89       916        96
VIS    2025250    183200   22.1900  143.9500      12.6        89       919        95
VIS    2025250    183200   22.1900  143.9200      12.9        89       931        99
VIS    2025250    183200   22.1900  143.8800      13.0        84       973        99
VIS    2025250    183200   22.1800  143.8700      13.0        85       937        98
VIS    2025250    183200   22.1900  143.8500      13.5        83       969        95
VIS    2025250    183200   22.1900  143.7700      13.0        88       912        93
VIS    2025250    183200   22.1900  143.7500      13.5        90       901        95
VIS    2025250    183200   22.1800  143.7200      13.9        87       892        91
VIS    2025250    183200   22.1900  143.7000      12.0        90       908        98
VIS    2025250    183200   22.1800  143.6600      12.0        91       915        98
VIS    2025250    183200   22.1800  143.6500      12.2        91       915        98
VIS    2025250    183200   22.1900  143.6100      11.8        92       894        94
VIS    2025250    183200   22.1900  143.6100      11.6        91       895        92
VIS    2025250    183200   22.1800  143.5600      11.7        90       917        99
VIS    2025250    183200   22.1800  143.5400      11.1        88       911        99
VIS    2025250    183200   22.1700  143.5300      10.5        86       911        98
VIS    2025250    183200   22.1800  143.3600       9.0        88       875        96
VIS    2025250    183200   22.1700  143.3400       9.1        88       875        94
VIS    2025250    183200   22.1700  143.1900      11.0        89       884        92
VIS    2025250    183200   22.1700  143.1600      10.5        85       884        91
VIS    2025250    183200   22.1700  143.1500      10.3        85       884        93
VIS    2025250    183200   22.1900  143.1200      11.0        94       898        98
VIS    2025250    183200   22.1700  143.1100      11.1        94       898        98
VIS    2025250    183200   22.1700  143.0800      11.0        92       908        99
VIS    2025250    183200   22.1700  143.0400      11.8        88       908        98
VIS    2025250    183200   22.1800  143.0200      12.4        90       908        96
VIS    2025250    183200   22.1800  143.0000      12.6        92       908        96
VIS    2025250    183200   22.1800  142.9700      11.8        93       908        96
VIS    2025250    183200   22.1900  142.9400      11.3        92       910        94
VIS    2025250    183200   22.1900  142.8900      11.6        88       958        91
VIS    2025250    183200   22.1800  142.8600      10.9        92       958        99
VIS    2025250    183200   22.1800  142.8600      10.2        94       907        98
VIS    2025250    183200   22.1800  142.8100       9.0        94       907        95
VIS    2025250    183200   22.1800  142.7900      10.5        93       915        97
VIS    2025250    183200   22.1800  142.7800      10.6        93       917        97
VIS    2025250    183200   22.1800  142.7400       9.7        91       873        91
VIS    2025250    183200   22.1700  142.6500      10.4       104       898        90
VIS    2025250    183200   22.1700  142.6200      10.2        97       911        94
VIS    2025250    183200   22.1600  142.5900      10.1        97       916        94
VIS    2025250    183200   22.1600  142.5700       9.5        96       917        97
VIS    2025250    183200   22.1700  142.5500       9.1        97       918        96
VIS    2025250    183200   22.1800  142.5300       9.7        94       918        98
VIS    2025250    183200   22.1800  142.5000      10.1        90       919        93
VIS    2025250    183200   22.1700  142.4600      11.2        88       919        97
VIS    2025250    183200   22.1800  142.4400      11.4        85       933        97
VIS    2025250    183200   22.1700  142.4300      11.4        87       933        99
VIS    2025250    183200   22.2600  151.6000       6.0        70       988        95
VIS    2025250    183200   22.2500  151.5600       6.1        75       935        96
VIS    2025250    183200   22.2600  151.5400       6.1        76       942        96
VIS    2025250    183200   22.2600  151.5100       5.4        85       942        97
VIS    2025250    183200   22.2600  151.4900       5.4        84       884        97
VIS    2025250    183200   22.2400  151.4800       6.1        75       863        90
VIS    2025250    183200   22.2600  151.3600       5.8        87       981        97
VIS    2025250    183200   22.2600  151.3300       5.5        83       923        97
VIS    2025250    183200   22.2400  150.4100       8.2        95       969        92
VIS    2025250    183200   22.2200  150.3900       7.5        92       961        94
VIS    2025250    183200   22.2200  150.1500       8.5       104       904        98
VIS    2025250    183200   22.2300  150.1400       9.2       103       900        97
VIS    2025250    183200   22.2300  150.1100       9.5        99       900        96
VIS    2025250    183200   22.2200  150.0700       8.9       102       904        97
VIS    2025250    183200   22.2200  150.0700       8.8       102       904        97
VIS    2025250    183200   22.2400  149.9500      10.4        96       911        91
VIS    2025250    183200   22.2200  149.9300      10.4        93       907        93
VIS    2025250    183200   22.2400  149.9000      11.0       110       894        94
VIS    2025250    183200   22.2300  149.8800      10.6       110       880        92
VIS    2025250    183200   22.2200  149.8600       9.8       109       872        94
VIS    2025250    183200   22.2200  149.8200       8.9       109       870        96
VIS    2025250    183200   22.2200  149.8100       8.8       109       870        96
VIS    2025250    183200   22.2100  149.7700       8.0       105       904        96
VIS    2025250    183200   22.2400  149.7500       8.0       101       928        97
VIS    2025250    183200   22.2300  149.7100       8.0       104       906        94
VIS    2025250    183200   22.2200  149.2200       8.7        76       975        97
VIS    2025250    183200   22.2200  149.2100       8.7        74       969        94
VIS    2025250    183200   22.2200  149.1900       9.0        75       969        94
VIS    2025250    183200   22.2300  149.1500       8.8        79       900        94
VIS    2025250    183200   22.2200  149.1400       8.9        79       904        96
VIS    2025250    183200   22.2300  149.1100       8.6        76       888        92
VIS    2025250    183200   22.2200  149.0200       7.9        72       887        91
VIS    2025250    183200   22.2000  148.9700       8.8        86       865        92
VIS    2025250    183200   22.2200  148.9400       8.6        80       863        94
VIS    2025250    183200   22.2200  148.9300       8.7        83       864        94
VIS    2025250    183200   22.2100  148.9000       9.3        93       864        93
VIS    2025250    183200   22.2200  148.8900       9.6        95       864        91
VIS    2025250    183200   22.2000  148.8500       9.5        97       863        91
VIS    2025250    183200   22.2200  148.8300       9.6        99       874        90
VIS    2025250    183200   22.2000  148.7900       9.5        97       868        93
VIS    2025250    183200   22.2000  148.7700       9.3        97       868        93
VIS    2025250    183200   22.2200  148.7400       9.1        95       873        98
VIS    2025250    183200   22.2000  148.7100       9.1        95       874        97
VIS    2025250    183200   22.2200  148.6900       9.1        96       873        98
VIS    2025250    183200   22.2000  148.6800       9.0        96       874        98
VIS    2025250    183200   22.2100  148.6400       8.9        96       873        94
VIS    2025250    183200   22.2100  148.6300       8.8        95       873        93
VIS    2025250    183200   22.2100  148.6000       8.4        93       873        91
VIS    2025250    183200   22.2200  148.5800       8.6        92       873        91
VIS    2025250    183200   22.2100  148.5500       8.8        93       874        95
VIS    2025250    183200   22.2000  148.5100       8.9        93       873        96
VIS    2025250    183200   22.2000  148.5000       8.9        93       873        96
VIS    2025250    183200   22.2200  148.4600       9.6        84       921        97
VIS    2025250    183200   22.2200  148.4500       9.7        83       924        97
VIS    2025250    183200   22.2200  148.4300       9.5        83       945        99
VIS    2025250    183200   22.2000  148.3900       9.3        82       971        99
VIS    2025250    183200   22.1900  148.3700       9.6        83       979       100
VIS    2025250    183200   22.1900  148.3300       9.5        85       989       100
VIS    2025250    183200   22.2000  148.3100       9.3        85       985        98
VIS    2025250    183200   22.2100  148.2800       9.6        83       935        98
VIS    2025250    183200   22.2000  148.2500       9.4        81       904        97
VIS    2025250    183200   22.2100  148.2300       9.2        81       894        96
VIS    2025250    183200   22.2000  148.2200       9.1        80       904        95
VIS    2025250    183200   22.2100  148.1300       9.2        83       931        95
VIS    2025250    183200   22.2000  148.1100       9.3        85       930        96
VIS    2025250    183200   22.2100  148.1000       9.2        84       924        93
VIS    2025250    183200   22.2000  148.0700       9.7        86       865        90
VIS    2025250    183200   22.2100  148.0300       9.8        86       862        93
VIS    2025250    183200   22.2100  148.0100      10.1        84       865        92
VIS    2025250    183200   22.2000  147.9900      10.1        83       879        93
VIS    2025250    183200   22.2100  147.9500      10.0        81       905        96
VIS    2025250    183200   22.2100  147.9200       9.9        77       957        96
VIS    2025250    183200   22.1900  147.8800      10.2        82       982       100
VIS    2025250    183200   22.1900  147.8400      10.0        84       971        98
VIS    2025250    183200   22.2000  147.8300      10.3        87       971        97
VIS    2025250    183200   22.1900  147.8000      10.8        89       937        94
VIS    2025250    183200   22.2100  147.6400      10.5        91       973        95
VIS    2025250    183200   22.2100  147.6400      10.6        91       966        94
VIS    2025250    183200   22.1800  147.5700       8.9        92       940        93
VIS    2025250    183200   22.1900  147.5400       8.5        91       955        93
VIS    2025250    183200   22.1800  147.5200       9.2        91       960        95
VIS    2025250    183200   22.1800  147.5100       9.5        90       972        96
VIS    2025250    183200   22.2000  147.4800      11.7        87       994        99
VIS    2025250    183200   22.2000  147.4600      11.3        86       956        99
VIS    2025250    183200   22.1800  147.4300       9.2        87       913        96
VIS    2025250    183200   22.1800  147.3600       9.1        95       886        92
VIS    2025250    183200   22.2000  147.3400       8.2        93       886        95
VIS    2025250    183200   22.2000  147.3100       7.8        90       891        95
VIS    2025250    183200   22.1900  147.3000       7.6        88       890        91
VIS    2025250    183200   22.1800  146.9000       9.2       110       852        90
VIS    2025250    183200   22.2000  146.8100       8.7        97       867        95
VIS    2025250    183200   22.1900  146.8000       8.1        98       871        97
VIS    2025250    183200   22.1700  146.6300      10.1       101       738        90
VIS    2025250    183200   22.1900  146.6000       9.0       102       732        91
VIS    2025250    183200   22.1700  146.5000      10.7        86       853        91
VIS    2025250    183200   22.1900  146.4900      11.1        88       853        91
VIS    2025250    183200   22.1900  146.4800      11.2        88       901        98
VIS    2025250    183200   22.1700  146.4300      11.8        89       918        96
VIS    2025250    183200   22.1800  146.4200      12.1        88       915        98
VIS    2025250    183200   22.1800  146.4000      12.8        86       918        97
VIS    2025250    183200   22.1900  146.3500      11.2        87       926        95
VIS    2025250    183200   22.1900  146.3500      11.0        88       923        96
VIS    2025250    183200   22.1800  146.3100      11.5        88       915        96
VIS    2025250    183200   22.1800  146.2800      12.0        86       915        93
VIS    2025250    183200   22.1800  146.2700      11.8        85       910        93
VIS    2025250    183200   22.1900  146.2500      12.1        82       908        92
VIS    2025250    183200   22.1700  146.2000      11.4        86       915        98
VIS    2025250    183200   22.1800  146.1800      11.2        85       918        95
VIS    2025250    183200   22.1700  146.1500      12.0        83       923        97
VIS    2025250    183200   22.1700  146.1300      11.8        84       923        95
VIS    2025250    183200   22.1900  146.1000      11.8        88       926        96
VIS    2025250    183200   22.1800  146.0800      12.2        84       932       100
VIS    2025250    183200   22.1700  146.0600      11.4        82       934        99
VIS    2025250    183200   22.1700  146.0300      10.2        81       939        98
VIS    2025250    183200   22.1900  146.0100      10.5        82       949        96
VIS    2025250    183200   22.1900  145.9800      12.1        87       945        96
VIS    2025250    183200   22.1700  145.9500      12.9        88       935        99
VIS    2025250    183200   22.1700  145.9500      12.9        88       937        99
VIS    2025250    183200   22.1900  145.9000      11.1        86       984        98
VIS    2025250    183200   22.1900  145.8900      11.2        86       984        97
VIS    2025250    183200   22.1800  145.8700      11.3        84       984        96
VIS    2025250    183200   22.1900  145.8500      11.9        83       966        94
VIS    2025250    183200   22.1800  145.8200      12.2        81       966        90
VIS    2025250    183200   22.1700  145.7800      13.0        80       940        90
VIS    2025250    183200   22.1800  145.7700      13.1        79       938        94
VIS    2025250    183200   22.1600  145.7400      15.1        83       933        93
VIS    2025250    183200   22.1700  145.7000      15.1        85       935        96
VIS    2025250    183200   22.1700  145.6900      14.9        84       935        97
VIS    2025250    183200   22.1700  145.3000      13.0        86       960        97
VIS    2025250    183200   22.1700  145.0600      13.6        89       966        96
VIS    2025250    183200   22.1800  145.0400      12.9        88       944        97
VIS    2025250    183200   22.1600  145.0200      13.3        88       960        97
VIS    2025250    183200   22.1700  144.9900      13.6        86       944        97
VIS    2025250    183200   22.1600  144.9600      13.9        87       940        96
VIS    2025250    183200   22.1700  144.9300      14.4        88       936        96
VIS    2025250    183200   22.1800  144.9200      14.7        88       934        96
VIS    2025250    183200   22.1800  144.9000      14.8        88       931        96
VIS    2025250    183200   22.1600  144.8800      15.1        88       928        95
VIS    2025250    183200   22.1600  144.8500      15.8        94       935        92
VIS    2025250    183200   22.1500  144.8200      15.2        91       938        94
VIS    2025250    183200   22.1600  144.7800      15.0        87       934        96
VIS    2025250    183200   22.1600  144.7600      15.5        89       933        95
VIS    2025250    183200   22.1600  144.7400      15.6        87       930        95
VIS    2025250    183200   22.1600  144.7200      15.4        86       928        95
VIS    2025250    183200   22.1600  144.6900      14.2        85       920        93
VIS    2025250    183200   22.1600  144.6700      13.8        84       917        92
VIS    2025250    183200   22.1600  144.6500      13.9        83       912        92
VIS    2025250    183200   22.1600  144.6300      14.3        81       912        92
VIS    2025250    183200   22.1700  144.5900      12.4        83       917        99
VIS    2025250    183200   22.1600  144.5600      10.6        92       905        97
VIS    2025250    183200   22.1700  144.4200      10.3        94       883        94
VIS    2025250    183200   22.1700  144.3600      10.5       102       894        95
VIS    2025250    183200   22.1700  144.3300      10.4       104       894        93
VIS    2025250    183200   22.1700  144.3300      10.1       105       894        90
VIS    2025250    183200   22.1500  144.2100      12.3        94       877        96
VIS    2025250    183200   22.1600  144.1900      12.4        95       885        97
VIS    2025250    183200   22.1700  144.1700      12.7        92       895        94
VIS    2025250    183200   22.1600  144.1300      11.7        85       907        98
VIS    2025250    183200   22.1600  144.1100      11.8        85       918        97
VIS    2025250    183200   22.1500  144.1000      11.9        85       918        96
VIS    2025250    183200   22.1700  144.0500      13.1        88       918        93
VIS    2025250    183200   22.1700  144.0100      13.1        91       913        96
VIS    2025250    183200   22.1500  143.9900      12.3        90       912        98
VIS    2025250    183200   22.1600  143.9600      12.1        89       919        94
VIS    2025250    183200   22.1500  143.9500      11.8        89       914        92
VIS    2025250    183200   22.1600  143.9100      12.8        88       943        97
VIS    2025250    183200   22.1600  143.9000      12.9        88       943        98
VIS    2025250    183200   22.1700  143.8700      12.9        86       937        99
VIS    2025250    183200   22.1500  143.7700      13.7        88       892        93
VIS    2025250    183200   22.1500  143.7500      13.2        88       892        92
VIS    2025250    183200   22.1700  143.7200      13.2        86       889        92
VIS    2025250    183200   22.1500  143.7000      13.1        91       909        97
VIS    2025250    183200   22.1600  143.6600      12.5        92       915        95
VIS    2025250    183200   22.1600  143.6500      12.5        92       915        95
VIS    2025250    183200   22.1500  143.6100       8.4       100       886        97
VIS    2025250    183200   22.1500  143.5900       8.9        95       893        93
VIS    2025250    183200   22.1500  143.5800      10.3        89       894        98
VIS    2025250    183200   22.1600  143.4000       9.4        85       871        92
VIS    2025250    183200   22.1600  143.3600       9.2        84       875        94
VIS    2025250    183200   22.1500  143.3500       9.5        86       875        93
VIS    2025250    183200   22.1600  143.1700      11.0        87       884        93
VIS    2025250    183200   22.1500  143.1400      11.1        87       890        95
VIS    2025250    183200   22.1400  143.1200      11.3        90       890        94
VIS    2025250    183200   22.1600  143.0900      11.1        94       902        98
VIS    2025250    183200   22.1500  143.0700      11.2        91       908        98
VIS    2025250    183200   22.1500  143.0200      12.3        92       908        91
VIS    2025250    183200   22.1600  142.9800      12.3        93       910        94
VIS    2025250    183200   22.1400  142.9500      10.7        99       911        93
VIS    2025250    183200   22.1500  142.6700      12.3       101       894        92
VIS    2025250    183200   22.1400  142.6500      12.4        99       904        95
VIS    2025250    183200   22.1400  142.6200      11.7        96       915        98
VIS    2025250    183200   22.1500  142.5900      10.7        96       916        97
VIS    2025250    183200   22.1600  142.5700       9.7        95       918        98
VIS    2025250    183200   22.1500  142.5500       9.6        94       918        98
VIS    2025250    183200   22.1600  142.5200       9.3        93       918        95
VIS    2025250    183200   22.1500  142.4900      10.4        92       919        97
VIS    2025250    183200   22.1500  142.4800      10.7        90       919        97
VIS    2025250    183200   22.1400  142.4400      11.7        93       921        99
VIS    2025250    183200   22.1400  142.4300      11.8        92       924        99
VIS    2025250    183200   22.2400  151.6200       6.2        85       991        96
VIS    2025250    183200   22.2300  151.6000       6.1        81       988        96
VIS    2025250    183200   22.2400  151.5700       6.3        76       931        98
VIS    2025250    183200   22.2200  151.4000       5.5        62       874        90
VIS    2025250    183200   22.2400  151.3900       5.3        82       918        91
VIS    2025250    183200   22.2200  151.2500       6.7        70       918        90
VIS    2025250    183200   22.2000  150.4200       7.8        98       987        93
VIS    2025250    183200   22.2000  150.3800       7.8        97       956        92
VIS    2025250    183200   22.2200  150.1600       8.3       105       943        91
VIS    2025250    183200   22.2100  150.1400       8.9       105       911        97
VIS    2025250    183200   22.2000  150.1200       9.3       103       904        97
VIS    2025250    183200   22.1900  149.9200      10.0        93       894        95
VIS    2025250    183200   22.1900  149.9100       9.8        95       884        96
VIS    2025250    183200   22.2000  149.8900       9.6       101       874        97
VIS    2025250    183200   22.2100  149.8600       9.7       108       872        94
VIS    2025250    183200   22.1900  149.8100       8.5       111       868        97
VIS    2025250    183200   22.2000  149.8100       8.6       109       868        98
VIS    2025250    183200   22.2100  149.7700       8.0       106       876        97
VIS    2025250    183200   22.2000  149.7600       8.0       106       904        96
VIS    2025250    183200   22.1900  149.7300       7.6       101       941        90
VIS    2025250    183200   22.2000  149.2100       8.9        75       969        95
VIS    2025250    183200   22.2000  149.1800       9.5        76       942        93
VIS    2025250    183200   22.1900  149.1500       9.2        79       921        98
VIS    2025250    183200   22.1800  149.1200       8.4        80       904        98
VIS    2025250    183200   22.1800  149.1000       8.3        80       885        93
VIS    2025250    183200   22.1800  149.0400       9.0        78       876        91
VIS    2025250    183200   22.1900  149.0100       9.0        81       866        91
VIS    2025250    183200   22.1800  148.9800       8.8        88       865        94
VIS    2025250    183200   22.2000  148.9500       8.7        86       865        96
VIS    2025250    183200   22.1800  148.9200       9.7        97       865        92
VIS    2025250    183200   22.1800  148.9100       9.7        98       865        92
VIS    2025250    183200   22.1800  148.8900       9.5        97       864        92
VIS    2025250    183200   22.1800  148.8400       9.4        95       876        94
VIS    2025250    183200   22.1900  148.8400       9.4        95       876        94
VIS    2025250    183200   22.1800  148.7900       9.3        97       876        94
VIS    2025250    183200   22.2000  148.7800       9.3        97       868        93
VIS    2025250    183200   22.1800  148.7500       9.2        95       874        94
VIS    2025250    183200   22.1700  148.7200       9.4        94       874        97
VIS    2025250    183200   22.1900  148.7000       9.1        95       874        97
VIS    2025250    183200   22.1700  148.6600       8.9        96       876        98
VIS    2025250    183200   22.1800  148.6600       9.0        97       875        98
VIS    2025250    183200   22.1800  148.6200       8.7        96       874        98
VIS    2025250    183200   22.1700  148.5900       8.5        95       873        97
VIS    2025250    183200   22.1800  148.5800       8.5        95       873        94
VIS    2025250    183200   22.1700  148.5400       8.4        97       874        97
VIS    2025250    183200   22.1800  148.5300       8.5        95       873        98
VIS    2025250    183200   22.1800  148.5000       8.6        92       873        97
VIS    2025250    183200   22.1800  148.4800       8.3        91       874        96
VIS    2025250    183200   22.1900  148.4300       9.2        82       916        97
VIS    2025250    183200   22.1700  148.4100       9.2        81       916        99
VIS    2025250    183200   22.1900  148.4000       9.4        81       945       100
VIS    2025250    183200   22.1700  148.3700       9.3        82       978        99
VIS    2025250    183200   22.1800  148.3400       9.4        84       979       100
VIS    2025250    183200   22.1900  148.3000       9.3        83       985       100
VIS    2025250    183200   22.1800  148.2600       9.0        82       948        99
VIS    2025250    183200   22.1800  148.2500       9.0        81       948        99
VIS    2025250    183200   22.1800  148.2100       9.3        77       930        95
VIS    2025250    183200   22.1800  148.2000       9.1        77       931        94
VIS    2025250    183200   22.1900  148.1300       9.4        85       931        94
VIS    2025250    183200   22.1800  148.1100       9.7        86       924        98
VIS    2025250    183200   22.1800  148.0900       9.7        85       876        92
VIS    2025250    183200   22.1700  148.0400      10.3        85       862        90
VIS    2025250    183200   22.1900  148.0200      10.1        84       865        91
VIS    2025250    183200   22.1700  147.9900       9.9        77       879        92
VIS    2025250    183200   22.1600  147.9600       9.8        74       919        95
VIS    2025250    183200   22.1700  147.9300       9.7        81       983        95
VIS    2025250    183200   22.1800  147.9200      10.1        81       983        98
VIS    2025250    183200   22.1700  147.8700       9.8        84       982        98
VIS    2025250    183200   22.1800  147.8700       9.8        82       982        99
VIS    2025250    183200   22.1800  147.8400       9.8        83       959        96
VIS    2025250    183200   22.1800  147.8000      10.7        87       931        94
VIS    2025250    183200   22.1800  147.6600      10.6        90       973        97
VIS    2025250    183200   22.1800  147.6200       9.7        89       932        90
VIS    2025250    183200   22.1800  147.5800       9.0        92       935        93
VIS    2025250    183200   22.1600  147.5400       9.2        91       935        95
VIS    2025250    183200   22.1600  147.5400       9.1        91       935        95
VIS    2025250    183200   22.1700  147.4900      10.2        88       955        97
VIS    2025250    183200   22.1800  147.4700      10.7        86       943        97
VIS    2025250    183200   22.1600  147.4600       9.5        86       911        98
VIS    2025250    183200   22.1800  147.4400       9.3        87       913        97
VIS    2025250    183200   22.1600  147.4100       8.5        86       886        97
VIS    2025250    183200   22.1600  147.3700       8.9        90       886        97
VIS    2025250    183200   22.1600  147.3500       8.5        93       886        95
VIS    2025250    183200   22.1600  146.9200       9.8       104       782        94
VIS    2025250    183200   22.1700  146.8900       8.9       106       857        90
VIS    2025250    183200   22.1600  146.8200       8.6        90       885        94
VIS    2025250    183200   22.1500  146.7900       7.8        91       885        92
VIS    2025250    183200   22.1600  146.7800       7.2        97       878        92
VIS    2025250    183200   22.1500  146.7500       8.6        94       868        94
VIS    2025250    183200   22.1600  146.7200      10.0       112       736        91
VIS    2025250    183200   22.1700  146.6300      10.1       102       738        90
VIS    2025250    183200   22.1600  146.5900       9.5       104       745        95
VIS    2025250    183200   22.1700  146.5100      10.7        86       790        90
VIS    2025250    183200   22.1700  146.5000      10.8        86       862        92
VIS    2025250    183200   22.1600  146.4600      11.0        90       918        98
VIS    2025250    183200   22.1600  146.4500      11.0        91       918        96
VIS    2025250    183200   22.1700  146.4300      11.8        89       918        95
VIS    2025250    183200   22.1700  146.3800      12.7        85       920        97
VIS    2025250    183200   22.1700  146.3800      12.5        85       920        97
VIS    2025250    183200   22.1600  146.3400      11.4        86       918        97
VIS    2025250    183200   22.1600  146.3200      11.6        87       918        99
VIS    2025250    183200   22.1400  146.3000      12.4        85       918        95
VIS    2025250    183200   22.1600  146.2100      11.6        84       915        97
VIS    2025250    183200   22.1600  146.2000      11.6        85       915        98
VIS    2025250    183200   22.1500  146.1700      11.4        85       923        94
VIS    2025250    183200   22.1600  146.1500      11.9        83       923        97
VIS    2025250    183200   22.1500  146.1100      12.1        84       926       100
VIS    2025250    183200   22.1500  146.0800      11.5        83       923        99
VIS    2025250    183200   22.1500  146.0500      11.1        83       923        99
VIS    2025250    183200   22.1500  146.0300      10.5        83       934        98
VIS    2025250    183200   22.1400  146.0100      10.7        83       932        97
VIS    2025250    183200   22.1500  145.9900      11.1        83       928        96
VIS    2025250    183200   22.1600  145.9600      12.5        87       935        99
VIS    2025250    183200   22.1600  145.9500      12.9        87       935        99
VIS    2025250    183200   22.1400  145.9100      11.2        88       972        94
VIS    2025250    183200   22.1400  145.8700      11.2        85       982        90
VIS    2025250    183200   22.1400  145.8400      11.7        78       975        94
VIS    2025250    183200   22.1400  145.7700      13.8        81       934        92
VIS    2025250    183200   22.1600  145.7300      15.0        83       933        94
VIS    2025250    183200   22.1400  145.7000      15.3        87       938        95
VIS    2025250    183200   22.1500  145.6800      15.5        85       939        95
VIS    2025250    183200   22.1500  145.6500      14.2        83       947        97
VIS    2025250    183200   22.1300  145.0800      13.9        84       992        93
VIS    2025250    183200   22.1300  145.0700      14.0        83       992        93
VIS    2025250    183200   22.1500  145.0500      13.7        88       977        95
VIS    2025250    183200   22.1300  145.0000      14.6        93       962        94
VIS    2025250    183200   22.1300  144.9800      14.1        91       936        95
VIS    2025250    183200   22.1300  144.9600      14.0        89       936        94
VIS    2025250    183200   22.1500  144.9300      14.5        88       934        96
VIS    2025250    183200   22.1500  144.9200      14.8        88       928        96
VIS    2025250    183200   22.1500  144.8800      15.0        89       928        96
VIS    2025250    183200   22.1300  144.8600      15.3        91       931        94
VIS    2025250    183200   22.1500  144.8500      15.7        93       935        93
VIS    2025250    183200   22.1300  144.8200      15.6        90       930        94
VIS    2025250    183200   22.1300  144.7900      15.3        88       919        95
VIS    2025250    183200   22.1400  144.7700      15.5        87       926        95
VIS    2025250    183200   22.1300  144.7300      15.3        85       921        94
VIS    2025250    183200   22.1300  144.7200      15.0        85       920        94
VIS    2025250    183200   22.1400  144.7000      14.8        85       920        92
VIS    2025250    183200   22.1500  144.6600      13.8        80       913        91
VIS    2025250    183200   22.1500  144.6500      13.8        79       912        90
VIS    2025250    183200   22.1300  144.6200      14.6        82       911        93
VIS    2025250    183200   22.1400  144.5900      11.6        81       904        90
VIS    2025250    183200   22.1400  144.2000      12.5        93       908        98
VIS    2025250    183200   22.1300  144.1700      12.5        90       912        95
VIS    2025250    183200   22.1400  144.1400      11.8        88       912        97
VIS    2025250    183200   22.1400  144.1100      11.4        88       920        95
VIS    2025250    183200   22.1400  144.1000      11.7        87       918        95
VIS    2025250    183200   22.1300  144.0500      12.7        87       909        93
VIS    2025250    183200   22.1200  144.0100      12.1        91       910        99
VIS    2025250    183200   22.1300  143.9900      11.9        91       912        98
VIS    2025250    183200   22.1400  143.9700      11.7        89       912        96
VIS    2025250    183200   22.1400  143.9500      11.6        90       912        93
VIS    2025250    183200   22.1400  143.9100      12.7        88       927        99
VIS    2025250    183200   22.1300  143.8800      13.0        87       910        98
VIS    2025250    183200   22.1400  143.8800      13.0        88       914        99
VIS    2025250    183200   22.1300  143.7900      12.4        87       918        98
VIS    2025250    183200   22.1200  143.7300      11.7        90       901        98
VIS    2025250    183200   22.1200  143.7100      12.8        88       901        96
VIS    2025250    183200   22.1200  143.7000      12.8        87       901        96
VIS    2025250    183200   22.1400  143.6700      12.8        88       909        93
VIS    2025250    183200   22.1200  143.6300      11.3        84       889        95
VIS    2025250    183200   22.1300  143.1900      11.2        94       893        97
VIS    2025250    183200   22.1200  143.1700      10.5        93       894        91
VIS    2025250    183200   22.1300  143.1400      10.8        88       890        95
VIS    2025250    183200   22.1400  143.1200      11.1        89       890        93
VIS    2025250    183200   22.1400  143.0900      11.6        92       910        98
VIS    2025250    183200   22.1100  143.0700      11.8        91       910        98
VIS    2025250    183200   22.1100  142.6900      12.6        94       894        94
VIS    2025250    183200   22.1200  142.6700      12.8        94       898        92
VIS    2025250    183200   22.1100  142.6600      12.9        94       913        96
VIS    2025250    183200   22.1200  142.6200      11.4        92       918        99
VIS    2025250    183200   22.1100  142.5900      10.9        88       919        98
VIS    2025250    183200   22.1100  142.5800      11.0        88       919        99
VIS    2025250    183200   22.1200  142.5500      11.2        88       919        99
VIS    2025250    183200   22.1200  142.5200      11.0        89       919        97
VIS    2025250    183200   22.1200  142.5100      11.6        89       919        96
VIS    2025250    183200   22.1300  142.4700      11.1        92       919        98
VIS    2025250    183200   22.1300  142.4400      11.9        94       921        98
VIS    2025250    183200   22.1300  142.4300      12.1        94       921        98
VIS    2025250    183200   22.2000  151.5900       6.9        89       931        92
VIS    2025250    183200   22.2100  151.5800       6.7        86       931        96
VIS    2025250    183200   22.1900  151.2200       6.9        80       968        94
VIS    2025250    183200   22.1800  150.4100       8.2        94       987        90
VIS    2025250    183200   22.1800  150.3800       8.5        96       971        90
VIS    2025250    183200   22.1800  150.0600       8.9       101       919        95
VIS    2025250    183200   22.1700  149.9500      10.0       102       914        92
VIS    2025250    183200   22.1900  149.9200       9.9        93       891        94
VIS    2025250    183200   22.1700  149.9100       9.4        97       881        97
VIS    2025250    183200   22.1700  149.8800       9.5       100       871        96
VIS    2025250    183200   22.1700  149.8400       8.6       106       868        94
VIS    2025250    183200   22.1600  149.8200       7.9       108       867        98
VIS    2025250    183200   22.1800  149.7900       8.1       112       869        96
VIS    2025250    183200   22.1700  149.7700       8.1       105       876        98
VIS    2025250    183200   22.1700  149.7500       8.1       104       884        99
VIS    2025250    183200   22.1700  149.7300       7.9       102       920        94
VIS    2025250    183200   22.1700  149.2000      10.1        77       978        91
VIS    2025250    183200   22.1800  149.1900      10.3        77       978        94
VIS    2025250    183200   22.1600  149.1400       8.7        84       932        99
VIS    2025250    183200   22.1700  149.1200       8.3        82       897        95
VIS    2025250    183200   22.1700  149.1100       8.2        81       888        94
VIS    2025250    183200   22.1700  149.0800       8.8        79       876        90
VIS    2025250    183200   22.1500  149.0100       9.7        88       865        93
VIS    2025250    183200   22.1500  149.0000       9.7        90       865        93
VIS    2025250    183200   22.1700  148.9800       8.9        89       865        95
VIS    2025250    183200   22.1700  148.9400       9.4        96       866        93
VIS    2025250    183200   22.1700  148.9200       9.8        98       865        92
VIS    2025250    183200   22.1700  148.9000       9.7        98       864        91
VIS    2025250    183200   22.1600  148.8700       9.4        96       863        93
VIS    2025250    183200   22.1600  148.8400       9.4        95       865        93
VIS    2025250    183200   22.1700  148.8100       9.5        97       880        93
VIS    2025250    183200   22.1600  148.8000       9.5        97       885        94
VIS    2025250    183200   22.1500  148.7700       9.0        95       876        95
VIS    2025250    183200   22.1600  148.7400       9.2        93       874        98
VIS    2025250    183200   22.1500  148.7200       9.3        92       874        97
VIS    2025250    183200   22.1700  148.7000       9.1        93       874        98
VIS    2025250    183200   22.1700  148.6600       8.9        94       876        98
VIS    2025250    183200   22.1500  148.6400       8.9        91       876        99
VIS    2025250    183200   22.1500  148.6200       8.6        92       874        99
VIS    2025250    183200   22.1600  148.6000       8.5        94       872        99
VIS    2025250    183200   22.1700  148.5700       8.5        97       873        97
VIS    2025250    183200   22.1500  148.5300       7.9        96       874        98
VIS    2025250    183200   22.1500  148.5200       7.9        96       874        98
VIS    2025250    183200   22.1500  148.4900       7.7        95       874        97
VIS    2025250    183200   22.1600  148.4700       7.6        92       874        97
VIS    2025250    183200   22.1500  148.4300       8.3        81       876        95
VIS    2025250    183200   22.1600  148.4100       9.3        81       916        99
VIS    2025250    183200   22.1500  148.3900       9.2        81       916        98
VIS    2025250    183200   22.1600  148.3700       9.3        82       971        99
VIS    2025250    183200   22.1600  148.3500       9.1        82       962        99
VIS    2025250    183200   22.1500  148.2900       8.9        81       985        98
VIS    2025250    183200   22.1600  148.2600       8.8        82       969       100
VIS    2025250    183200   22.1500  148.2200       9.6        78       954        98
VIS    2025250    183200   22.1500  148.2100       9.8        78       942        98
VIS    2025250    183200   22.1400  148.1800       9.8        84       927        95
VIS    2025250    183200   22.1500  148.1600       9.7        87       924        93
VIS    2025250    183200   22.1600  148.1300       9.7        88       915        94
VIS    2025250    183200   22.1400  148.1000      10.3        82       870        92
VIS    2025250    183200   22.1600  148.0800      10.1        84       870        90
VIS    2025250    183200   22.1400  148.0600      10.7        82       871        90
VIS    2025250    183200   22.1500  148.0300      10.0        82       868        92
VIS    2025250    183200   22.1400  148.0000       9.6        70       882        91
VIS    2025250    183200   22.1600  147.9900       9.9        70       882        91
VIS    2025250    183200   22.1600  147.9600       9.9        74       931        96
VIS    2025250    183200   22.1400  147.9300       9.6        84       985        97
VIS    2025250    183200   22.1600  147.8900       9.6        84       982        98
VIS    2025250    183200   22.1600  147.8800       9.5        83       982        97
VIS    2025250    183200   22.1400  147.8500       7.6        79       900        96
VIS    2025250    183200   22.1400  147.8200       9.1        82       900        97
VIS    2025250    183200   22.1600  147.8100      10.2        85       911        91
VIS    2025250    183200   22.1400  147.7100      10.5        90       984        95
VIS    2025250    183200   22.1600  147.6900      10.4        90       970        90
VIS    2025250    183200   22.1500  147.6800      10.3        90       970        92
VIS    2025250    183200   22.1500  147.6400      10.3        90       934        97
VIS    2025250    183200   22.1500  147.6300      10.3        90       927        97
VIS    2025250    183200   22.1300  147.6000      10.4        90       907        98
VIS    2025250    183200   22.1500  147.5800       9.8        92       919        94
VIS    2025250    183200   22.1500  147.5500       9.6        91       935        96
VIS    2025250    183200   22.1300  147.5100       9.6        93       899        98
VIS    2025250    183200   22.1300  147.5100       9.5        93       899        98
VIS    2025250    183200   22.1400  147.4800       9.7        90       899        96
VIS    2025250    183200   22.1300  147.4500       9.3        88       894        96
VIS    2025250    183200   22.1500  147.4200       8.6        86       886        97
VIS    2025250    183200   22.1300  147.3800       8.7        87       877        96
VIS    2025250    183200   22.1400  147.3800       9.0        88       883        98
VIS    2025250    183200   22.1300  147.0200       9.7       113       743        90
VIS    2025250    183200   22.1500  146.9900       9.0       105       728        90
VIS    2025250    183200   22.1300  146.9300      11.2        95       875        98
VIS    2025250    183200   22.1500  146.9100      10.3        96       875        98
VIS    2025250    183200   22.1300  146.9000      10.7        89       889        97
VIS    2025250    183200   22.1200  146.8600       9.9        88       889        95
VIS    2025250    183200   22.1500  146.8400       9.5        90       886        93
VIS    2025250    183200   22.1200  146.8100       9.2        90       888        93
VIS    2025250    183200   22.1300  146.7900       8.4        89       886        92
VIS    2025250    183200   22.1400  146.7500       8.7        92       878        95
VIS    2025250    183200   22.1300  146.7300       9.2        93       878        97
VIS    2025250    183200   22.1300  146.7200       9.2        96       878        98
VIS    2025250    183200   22.1300  146.6900       8.7       116       771        92
VIS    2025250    183200   22.1300  146.6000      10.3       103       911        90
VIS    2025250    183200   22.1300  146.6000      10.1       102       911        93
VIS    2025250    183200   22.1300  146.5300      11.3        88       875        94
VIS    2025250    183200   22.1300  146.5100      12.1        86       910        99
VIS    2025250    183200   22.1200  146.4700      12.3        90       925        98
VIS    2025250    183200   22.1400  146.4700      11.5        90       913        99
VIS    2025250    183200   22.1300  146.4200      11.2        87       915        99
VIS    2025250    183200   22.1400  146.4200      11.5        87       913        97
VIS    2025250    183200   22.1300  146.3800      12.1        83       915        99
VIS    2025250    183200   22.1300  146.3500      13.0        84       918        97
VIS    2025250    183200   22.1200  146.3200      13.3        86       933        97
VIS    2025250    183200   22.1200  146.3000      13.0        85       933        95
VIS    2025250    183200   22.1300  146.2900      12.7        84       921        94
VIS    2025250    183200   22.1200  146.2100      12.6        79       926        94
VIS    2025250    183200   22.1300  146.1900      12.6        82       926        97
VIS    2025250    183200   22.1200  146.1500      11.9        84       923        95
VIS    2025250    183200   22.1200  146.1400      12.2        85       923       100
VIS    2025250    183200   22.1200  146.1000      12.2        84       923        99
VIS    2025250    183200   22.1200  146.0800      11.0        82       923        99
VIS    2025250    183200   22.1200  146.0600      11.2        82       923        99
VIS    2025250    183200   22.1400  146.0300      10.9        83       932        98
VIS    2025250    183200   22.1300  146.0000      11.0        84       926        95
VIS    2025250    183200   22.1400  145.9700      12.1        85       923        98
VIS    2025250    183200   22.1400  145.9500      12.6        87       935        99
VIS    2025250    183200   22.1300  145.9200      11.8        88       949        97
VIS    2025250    183200   22.1300  145.9200      11.4        88       972        95
VIS    2025250    183200   22.1300  145.8500      11.8        80       975        95
VIS    2025250    183200   22.1300  145.8400      11.9        77       971        96
VIS    2025250    183200   22.1200  145.8100      12.6        79       945        95
VIS    2025250    183200   22.1300  145.7900      13.4        80       936        92
VIS    2025250    183200   22.1100  145.7600      14.7        84       936        96
VIS    2025250    183200   22.1100  145.7400      14.6        85       939        96
VIS    2025250    183200   22.1200  145.7000      14.9        86       948        95
VIS    2025250    183200   22.1100  145.0800      14.0        85       978        97
VIS    2025250    183200   22.1200  145.0500      14.8        84       982        96
VIS    2025250    183200   22.1100  145.0400      15.1        86       975        96
VIS    2025250    183200   22.1100  145.0000      15.4        92       962        93
VIS    2025250    183200   22.1300  144.9800      14.4        90       936        95
VIS    2025250    183200   22.1100  144.9700      15.0        88       932        96
VIS    2025250    183200   22.1100  144.9300      14.9        88       928        96
VIS    2025250    183200   22.1000  144.9000      14.9        90       924        96
VIS    2025250    183200   22.1100  144.8800      15.0        91       928        95
VIS    2025250    183200   22.1000  144.8600      15.3        90       931        94
VIS    2025250    183200   22.1200  144.8200      15.7        90       930        94
VIS    2025250    183200   22.1000  144.8100      15.7        91       919        93
VIS    2025250    183200   22.1100  144.7700      15.5        86       911        93
VIS    2025250    183200   22.1200  144.7600      15.4        84       919        95
VIS    2025250    183200   22.1200  144.7300      15.1        84       920        95
VIS    2025250    183200   22.1200  144.7100      14.5        85       920        92
VIS    2025250    183200   22.1200  144.6900      14.0        86       917        93
VIS    2025250    183200   22.1200  144.6700      13.5        86       914        90
VIS    2025250    183200   22.1000  144.1800      12.7        88       910        97
VIS    2025250    183200   22.1100  144.1600      12.9        86       912        95
VIS    2025250    183200   22.1000  144.1300      13.7        90       909        95
VIS    2025250    183200   22.1100  144.1100      13.4        89       912        95
VIS    2025250    183200   22.1200  144.0900      12.5        87       912        95
VIS    2025250    183200   22.1000  144.0600      11.9        88       911        96
VIS    2025250    183200   22.1000  144.0200      11.9        91       910        91
VIS    2025250    183200   22.1000  143.9700      11.4        90       914        98
VIS    2025250    183200   22.1000  143.9600      12.2        90       906        98
VIS    2025250    183200   22.1200  143.9300      11.7        90       907        92
VIS    2025250    183200   22.1000  143.9200      12.4        88       906        93
VIS    2025250    183200   22.1200  143.8900      13.1        87       909        97
VIS    2025250    183200   22.1000  143.8600      12.4        88       900        96
VIS    2025250    183200   22.1000  143.7400       9.5        93       897        91
VIS    2025250    183200   22.1100  143.7000      12.6        87       901        96
VIS    2025250    183200   22.1100  143.6900      12.6        86       899        95
VIS    2025250    183200   22.0900  143.2600      12.5        85       876        91
VIS    2025250    183200   22.1000  143.2400      13.2        87       879        90
VIS    2025250    183200   22.1000  143.1800      10.1        93       893        90
VIS    2025250    183200   22.1000  143.1200      11.1        88       901        92
VIS    2025250    183200   22.1000  143.1000      13.0        89       906        96
VIS    2025250    183200   22.1000  143.0600      12.1        91       910        98
VIS    2025250    183200   22.1000  142.9000      11.6        98       901        92
VIS    2025250    183200   22.0900  142.7500      13.0        98       902        93
VIS    2025250    183200   22.1100  142.6900      12.6        94       898        95
VIS    2025250    183200   22.1100  142.6600      13.0        93       914        96
VIS    2025250    183200   22.0900  142.6300      11.9        90       918        97
VIS    2025250    183200   22.1000  142.6200      11.3        89       918        99
VIS    2025250    183200   22.1100  142.5900      11.0        88       919        98
VIS    2025250    183200   22.1100  142.5800      11.2        87       919        99
VIS    2025250    183200   22.1000  142.5400      11.8        89       919        94
VIS    2025250    183200   22.1100  142.4800      11.5        90       919        90
VIS    2025250    183200   22.1100  142.4600      11.7        92       919        98
VIS    2025250    183200   22.1000  142.4500      12.0        93       919        98
VIS    2025250    183200   22.1900  151.5600       7.1        88       912        91
VIS    2025250    183200   22.1800  151.5500       7.1        85       912        92
VIS    2025250    183200   22.1700  151.5200       7.2        77       869        92
VIS    2025250    183200   22.1700  151.5000       7.4        74       862        90
VIS    2025250    183200   22.1800  151.2200       6.8        82       968        95
VIS    2025250    183200   22.1800  151.2100       6.8        83       968        95
VIS    2025250    183200   22.1600  150.0700       8.9       100       938        90
VIS    2025250    183200   22.1500  149.9500       9.9       108       914        92
VIS    2025250    183200   22.1600  149.9100       9.3        98       881        98
VIS    2025250    183200   22.1600  149.9100       9.3        98       874        98
VIS    2025250    183200   22.1400  149.8700       9.7        97       871        96
VIS    2025250    183200   22.1500  149.8300       8.1       102       867       100
VIS    2025250    183200   22.1600  149.8100       7.8       106       867        99
VIS    2025250    183200   22.1600  149.7300       8.0       102       916        94
VIS    2025250    183200   22.1600  149.7200       7.9       101       938        91
VIS    2025250    183200   22.1300  149.1900       8.5        86       988        99
VIS    2025250    183200   22.1300  149.1600       8.9        88       932        98
VIS    2025250    183200   22.1300  149.1500       8.9        89       924        95
VIS    2025250    183200   22.1300  149.0800       9.5        83       864        93
VIS    2025250    183200   22.1400  149.0600       9.5        82       864        91
VIS    2025250    183200   22.1500  149.0200       9.7        88       865        93
VIS    2025250    183200   22.1400  148.9900       9.6        92       865        93
VIS    2025250    183200   22.1300  148.9700       9.6        93       867        93
VIS    2025250    183200   22.1300  148.9300       9.6        97       884        93
VIS    2025250    183200   22.1400  148.9200       9.8       100       879        91
VIS    2025250    183200   22.1400  148.9000       9.6        99       866        91
VIS    2025250    183200   22.1300  148.8600       9.4        96       865        93
VIS    2025250    183200   22.1300  148.8500       9.5        96       866        93
VIS    2025250    183200   22.1200  148.8100       9.8        96       897        94
VIS    2025250    183200   22.1200  148.7800       9.3        93       889        96
VIS    2025250    183200   22.1400  148.7700       9.0        94       876        96
VIS    2025250    183200   22.1300  148.7300       9.1        90       874        98
VIS    2025250    183200   22.1300  148.7000       9.0        87       874        98
VIS    2025250    183200   22.1200  148.6800       8.8        84       874        97
VIS    2025250    183200   22.1200  148.6500       8.2        82       875        95
VIS    2025250    183200   22.1300  148.6400       8.3        84       875        95
VIS    2025250    183200   22.1300  148.6200       8.2        88       872        95
VIS    2025250    183200   22.1300  148.5800       8.1        94       872        99
VIS    2025250    183200   22.1300  148.5600       8.0        96       872        99
VIS    2025250    183200   22.1300  148.5300       8.0        95       874        99
VIS    2025250    183200   22.1300  148.5000       7.8        94       874        99
VIS    2025250    183200   22.1200  148.4900       7.7        92       874        99
VIS    2025250    183200   22.1300  148.4600       7.5        93       874       100
VIS    2025250    183200   22.1300  148.4400       7.5        89       874        99
VIS    2025250    183200   22.1400  148.4000       8.7        83       884        96
VIS    2025250    183200   22.1400  148.3800       9.2        83       928        99
VIS    2025250    183200   22.1200  148.3600       9.3        86       928        97
VIS    2025250    183200   22.1200  148.3400       9.3        84       941        98
VIS    2025250    183200   22.1200  148.3100       9.3        82       956        99
VIS    2025250    183200   22.1300  148.2900       9.1        83       975        99
VIS    2025250    183200   22.1300  148.2000      10.0        80       965        97
VIS    2025250    183200   22.1400  148.1900      10.0        81       942        96
VIS    2025250    183200   22.1200  148.1600      10.0        81       932        95
VIS    2025250    183200   22.1300  148.1400      10.0        82       873        92
VIS    2025250    183200   22.1400  148.1000      10.2        81       870        92
VIS    2025250    183200   22.1300  148.0800      10.5        81       871        90
VIS    2025250    183200   22.1300  148.0500      10.6        79       873        90
VIS    2025250    183200   22.1300  148.0400      10.4        80       873        91
VIS    2025250    183200   22.1200  147.9500      10.2        83       981        97
VIS    2025250    183200   22.1200  147.9300      10.0        87       985        95
VIS    2025250    183200   22.1300  147.9000       8.9        83       963        92
VIS    2025250    183200   22.1300  147.8800       8.0        80       909        96
VIS    2025250    183200   22.1100  147.8400       8.0        80       883        97
VIS    2025250    183200   22.1100  147.8200       9.1        84       888        96
VIS    2025250    183200   22.1100  147.7400      10.7        88       986        97
VIS    2025250    183200   22.1200  147.7100      10.6        89       980        97
VIS    2025250    183200   22.1200  147.7000      10.5        89       970        97
VIS    2025250    183200   22.1300  147.6600      10.4        88       937        95
VIS    2025250    183200   22.1200  147.6400      10.5        87       923        99
VIS    2025250    183200   22.1100  147.6100      10.7        85       919        99
VIS    2025250    183200   22.1300  147.6100      10.5        89       917        99
VIS    2025250    183200   22.1100  147.5600       9.3        89       907        99
VIS    2025250    183200   22.1100  147.5500       9.1        88       899        98
VIS    2025250    183200   22.1100  147.5200       9.0        88       899        93
VIS    2025250    183200   22.1200  147.4800       9.5        92       884        90
VIS    2025250    183200   22.1200  147.4400       9.1        89       894        96
VIS    2025250    183200   22.1200  147.4200       8.7        88       883        96
VIS    2025250    183200   22.1300  147.3900       8.4        86       877        96
VIS    2025250    183200   22.1100  147.3700       8.0        89       873        96
VIS    2025250    183200   22.1100  147.0100       9.9       106       794        90
VIS    2025250    183200   22.1100  146.9900      10.3        95       794        91
VIS    2025250    183200   22.1000  146.9500      11.0        92       882        99
VIS    2025250    183200   22.1000  146.9400      11.1        92       882        98
VIS    2025250    183200   22.1200  146.9200      11.3        91       889        99
VIS    2025250    183200   22.1100  146.8900      10.2        88       895        97
VIS    2025250    183200   22.1200  146.8600       9.8        89       889        97
VIS    2025250    183200   22.1100  146.8300       9.7        91       889        95
VIS    2025250    183200   22.1200  146.8200       9.5        90       888        93
VIS    2025250    183200   22.1000  146.7800       9.4        82       889        93
VIS    2025250    183200   22.1000  146.7600      10.2        84       889        91
VIS    2025250    183200   22.1100  146.7300       9.8        88       906        93
VIS    2025250    183200   22.1200  146.7100       8.8        98       905        94
VIS    2025250    183200   22.1200  146.6100      10.6       103       911        92
VIS    2025250    183200   22.1100  146.6000      11.1        94       907        99
VIS    2025250    183200   22.1100  146.5700      11.1        87       891        97
VIS    2025250    183200   22.1200  146.5400      11.7        85       903        94
VIS    2025250    183200   22.1100  146.5000      12.7        88       931        98
VIS    2025250    183200   22.1000  146.4800      12.9        90       931        98
VIS    2025250    183200   22.1200  146.4700      12.4        89       923        98
VIS    2025250    183200   22.1100  146.4400      11.8        90       918        98
VIS    2025250    183200   22.0900  146.4100      10.7        85       925        95
VIS    2025250    183200   22.0900  146.3900      10.7        83       926        95
VIS    2025250    183200   22.0900  146.3700      11.8        83       930        99
VIS    2025250    183200   22.1100  146.3300      13.9        86       933        98
VIS    2025250    183200   22.1100  146.3000      13.5        84       951        94
VIS    2025250    183200   22.0900  146.2900      13.3        82       964        95
VIS    2025250    183200   22.0900  146.2600      13.2        82       933        97
VIS    2025250    183200   22.1000  146.2200      12.9        86       932        97
VIS    2025250    183200   22.0900  146.2000      12.6        87       932       100
VIS    2025250    183200   22.1000  146.1900      12.6        85       931        99
VIS    2025250    183200   22.1000  146.1700      12.4        84       928        94
VIS    2025250    183200   22.1000  146.1200      11.6        83       926       100
VIS    2025250    183200   22.1100  146.1000      11.7        84       926        99
VIS    2025250    183200   22.1100  146.0800      10.9        82       923        99
VIS    2025250    183200   22.1000  146.0600      10.6        80       926        94
VIS    2025250    183200   22.1100  146.0400      11.6        81       931        97
VIS    2025250    183200   22.1100  146.0000      12.3        84       921        93
VIS    2025250    183200   22.0900  145.9800      11.7        85       918        98
VIS    2025250    183200   22.1000  145.9500      12.4        83       913        95
VIS    2025250    183200   22.0900  145.9200      12.2        85       926        93
VIS    2025250    183200   22.1000  145.9000      11.6        86       946        93
VIS    2025250    183200   22.1100  145.8900      11.3        88       949        91
VIS    2025250    183200   22.0900  145.8600      12.1        85       978        99
VIS    2025250    183200   22.1100  145.8200      12.7        80       953        98
VIS    2025250    183200   22.0900  145.8100      13.2        82       953        99
VIS    2025250    183200   22.1000  145.7800      13.9        83       944        97
VIS    2025250    183200   22.0900  145.7600      15.0        84       947        96
VIS    2025250    183200   22.1100  145.7300      14.7        85       939        96
VIS    2025250    183200   22.1000  145.0900      14.1        86       978        97
VIS    2025250    183200   22.0900  145.0500      14.8        86       964        96
VIS    2025250    183200   22.1000  145.0300      15.0        86       965        96
VIS    2025250    183200   22.1000  145.0000      15.3        92       955        93
VIS    2025250    183200   22.0900  144.9900      15.2        89       942        95
VIS    2025250    183200   22.0900  144.9400      15.2        87       928        95
VIS    2025250    183200   22.0800  144.9200      15.4        90       923        94
VIS    2025250    183200   22.0800  144.8900      15.0        91       923        95
VIS    2025250    183200   22.0800  144.8900      15.0        91       921        95
VIS    2025250    183200   22.0900  144.8400      15.7        91       930        93
VIS    2025250    183200   22.0800  144.8200      15.7        93       914        93
VIS    2025250    183200   22.1000  144.8100      15.6        92       919        93
VIS    2025250    183200   22.0800  144.7800      15.2        89       907        94
VIS    2025250    183200   22.0900  144.6900      13.2        96       907        97
VIS    2025250    183200   22.0900  144.6700      12.3       102       887        90
VIS    2025250    183200   22.1000  144.6500      13.2       102       887        92
VIS    2025250    183200   22.0800  144.5800      13.9        82       900        92
VIS    2025250    183200   22.0700  144.3100      12.1        90       919        96
VIS    2025250    183200   22.0900  144.1900      12.5        90       904        95
VIS    2025250    183200   22.0900  144.1800      12.8        88       907        97
VIS    2025250    183200   22.0700  144.1500      13.6        86       881        92
VIS    2025250    183200   22.0700  144.1300      14.3        89       887        91
VIS    2025250    183200   22.0900  144.1100      14.3        90       905        95
VIS    2025250    183200   22.0800  144.0800      13.1        88       905        97
VIS    2025250    183200   22.0700  144.0400      12.2        90       910        93
VIS    2025250    183200   22.0900  143.9600      12.5        90       899        98
VIS    2025250    183200   22.0800  143.9300      13.0        86       897        95
VIS    2025250    183200   22.0700  143.8700      11.1        91       871        91
VIS    2025250    183200   22.0800  143.7300       9.1        97       897        91
VIS    2025250    183200   22.0700  143.7100      10.1        78       902        95
VIS    2025250    183200   22.0900  143.6900      11.8        85       899        96
VIS    2025250    183200   22.0700  143.6400      11.4        87       884        95
VIS    2025250    183200   22.0900  143.6400      10.6        86       884        90
VIS    2025250    183200   22.0800  143.2500      12.0        84       876        91
VIS    2025250    183200   22.0600  143.1300      12.2        92       890        94
VIS    2025250    183200   22.0700  143.1200      12.7        90       891        94
VIS    2025250    183200   22.0800  143.0400      11.2        89       895        97
VIS    2025250    183200   22.0700  142.9000      10.4        81       922        98
VIS    2025250    183200   22.0600  142.8800      10.6        79       923        97
VIS    2025250    183200   22.0700  142.7900      13.1        87       924        97
VIS    2025250    183200   22.0700  142.7600      12.7        91       922        96
VIS    2025250    183200   22.0700  142.7200      11.1        96       918        98
VIS    2025250    183200   22.0600  142.7100      10.6        93       919        99
VIS    2025250    183200   22.0800  142.6800      11.2        90       917        98
VIS    2025250    183200   22.0800  142.6500      11.6        89       918        98
VIS    2025250    183200   22.0800  142.6400      11.3        88       919        90
VIS    2025250    183200   22.0800  142.6200      11.6        86       919        96
VIS    2025250    183200   22.0700  142.5900      12.3        91       919        99
VIS    2025250    183200   22.0600  142.5500      12.4        90       919        99
VIS    2025250    183200   22.0600  142.5400      12.4        90       919        98
VIS    2025250    183200   22.0600  142.4700      11.6        94       919        98
VIS    2025250    183200   22.0600  142.4400      12.0        96       919        98
VIS    2025250    183200   22.0600  142.4200      12.5        95       920        97
VIS    2025250    183200   22.1500  151.5400       7.9        76       919        94
VIS    2025250    183200   22.1600  151.5300       7.4        75       885        94
VIS    2025250    183200   22.1400  151.2400       5.7        73       946        94
VIS    2025250    183200   22.1400  151.2300       5.9        76       946        95
VIS    2025250    183200   22.1500  151.2000       6.7        81       964        92
VIS    2025250    183200   22.1400  149.9400       9.5       106       914        94
VIS    2025250    183200   22.1200  149.9200       8.9       102       899        98
VIS    2025250    183200   22.1200  149.8800       9.3        97       873        98
VIS    2025250    183200   22.1200  149.8700       9.3        96       873        97
VIS    2025250    183200   22.1200  149.8300       8.0        96       870        99
VIS    2025250    183200   22.1000  149.2200      10.1        91       964        97
VIS    2025250    183200   22.1000  149.1900       9.1        89       964        99
VIS    2025250    183200   22.1000  149.1700       8.6        87       924        99
VIS    2025250    183200   22.1000  149.1500       8.6        86       894        95
VIS    2025250    183200   22.1200  149.1300       9.0        89       876        91
VIS    2025250    183200   22.1000  149.1100       9.1        90       866        91
VIS    2025250    183200   22.1000  149.0700       9.3        90       865        94
VIS    2025250    183200   22.1100  149.0500       9.3        89       865        94
VIS    2025250    183200   22.1000  149.0100       9.5        94       866        93
VIS    2025250    183200   22.1100  148.9900       9.5        94       867        93
VIS    2025250    183200   22.1000  148.9700       9.4        93       878        94
VIS    2025250    183200   22.1200  148.9400       9.6        96       884        93
VIS    2025250    183200   22.1000  148.9300       9.7        96       889        93
VIS    2025250    183200   22.1200  148.8900       9.4        99       866        92
VIS    2025250    183200   22.1100  148.8700       9.4        98       866        93
VIS    2025250    183200   22.1100  148.8500       9.3        95       866        94
VIS    2025250    183200   22.1000  148.8200       9.5        93       886        95
VIS    2025250    183200   22.1000  148.7900       9.6        91       900        96
VIS    2025250    183200   22.1200  148.7700       9.3        92       879        95
VIS    2025250    183200   22.1000  148.7500       9.2        88       876        97
VIS    2025250    183200   22.1000  148.7000       8.8        89       876        99
VIS    2025250    183200   22.1000  148.6900       8.5        86       875        98
VIS    2025250    183200   22.1200  148.6700       8.5        82       875        96
VIS    2025250    183200   22.1200  148.6400       7.9        84       875        95
VIS    2025250    183200   22.1000  148.6200       7.4        89       875        94
VIS    2025250    183200   22.1000  148.6000       7.8        92       873        99
VIS    2025250    183200   22.1100  148.5500       8.2        90       873        99
VIS    2025250    183200   22.1200  148.5500       8.0        93       872        98
VIS    2025250    183200   22.1000  148.5100       8.0        87       875        99
VIS    2025250    183200   22.0900  148.4800       8.0        86       875        98
VIS    2025250    183200   22.0900  148.4700       8.0        85       875        98
VIS    2025250    183200   22.0900  148.4200       7.6        82       877        97
VIS    2025250    183200   22.0900  148.4100       7.5        86       877        99
VIS    2025250    183200   22.1100  148.3900       8.3        90       884        98
VIS    2025250    183200   22.1100  148.3600       9.3        86       905        97
VIS    2025250    183200   22.1100  148.3500       9.4        84       941        98
VIS    2025250    183200   22.1000  148.3200       9.3        84       919        98
VIS    2025250    183200   22.1100  148.1800      10.1        82       965        94
VIS    2025250    183200   22.0900  148.1600      10.2        79       932        96
VIS    2025250    183200   22.0900  148.1200      10.2        78       877        91
VIS    2025250    183200   22.0900  148.1100      10.1        79       873        92
VIS    2025250    183200   22.0900  148.0700      10.3        77       866        90
VIS    2025250    183200   22.1100  148.0600      10.3        77       871        91
VIS    2025250    183200   22.1000  148.0200       9.3        76       889        95
VIS    2025250    183200   22.1000  148.0100       9.1        77       909        97
VIS    2025250    183200   22.1000  147.9800       9.3        79       942        97
VIS    2025250    183200   22.0900  147.9500      10.2        87       968        96
VIS    2025250    183200   22.1100  147.9200       9.8        90       965        92
VIS    2025250    183200   22.1000  147.8900       8.5        85       882        93
VIS    2025250    183200   22.0900  147.8700       8.4        84       870        95
VIS    2025250    183200   22.0900  147.8400       8.7        85       870        93
VIS    2025250    183200   22.1000  147.8200       9.3        85       888        95
VIS    2025250    183200   22.1100  147.8100       9.8        86       897        96
VIS    2025250    183200   22.0900  147.7400      10.2        84       984        98
VIS    2025250    183200   22.0800  147.7200      10.0        85       978        98
VIS    2025250    183200   22.0800  147.7000      10.4        86       948        99
VIS    2025250    183200   22.0800  147.6700      10.7        86       905        99
VIS    2025250    183200   22.1000  147.6400      10.6        82       916        99
VIS    2025250    183200   22.1000  147.6100      10.6        83       919        99
VIS    2025250    183200   22.0800  147.5900      10.0        84       907        98
VIS    2025250    183200   22.0900  147.5600       9.1        87       907        97
VIS    2025250    183200   22.0900  147.5500       9.0        87       900        93
VIS    2025250    183200   22.0800  147.4700       9.3        91       902        97
VIS    2025250    183200   22.1000  147.4400       9.0        91       894        98
VIS    2025250    183200   22.0900  147.4100       8.3        92       877        97
VIS    2025250    183200   22.0800  147.4000       8.0        92       873        97
VIS    2025250    183200   22.0800  147.0300      10.2        98       872        93
VIS    2025250    183200   22.0900  147.0100      10.3       102       865        91
VIS    2025250    183200   22.1000  146.9800      10.7        93       848        93
VIS    2025250    183200   22.0900  146.9600      10.8        91       882        95
VIS    2025250    183200   22.1000  146.9400      11.0        92       889        98
VIS    2025250    183200   22.0900  146.9200      10.8        89       892        98
VIS    2025250    183200   22.0900  146.8900       9.9        88       896        97
VIS    2025250    183200   22.0700  146.8500       9.4        85       896        95
VIS    2025250    183200   22.0800  146.8400       9.3        87       895        95
VIS    2025250    183200   22.0800  146.8000       9.1        85       894        95
VIS    2025250    183200   22.0900  146.8000       9.1        84       892        96
VIS    2025250    183200   22.0700  146.7500       9.1        83       896        96
VIS    2025250    183200   22.0700  146.6300      10.4       103       903        91
VIS    2025250    183200   22.0900  146.6100      11.5        98       891        98
VIS    2025250    183200   22.0800  146.5900      12.4        85       891        96
VIS    2025250    183200   22.0900  146.5500      11.3        85       933        97
VIS    2025250    183200   22.0900  146.5400      11.1        86       933        98
VIS    2025250    183200   22.0900  146.5000      11.8        88       933        98
VIS    2025250    183200   22.0800  146.4800      12.2        90       935        96
VIS    2025250    183200   22.0700  146.4600      11.9        90       936        91
VIS    2025250    183200   22.0900  146.4400      11.3        89       925        93
VIS    2025250    183200   22.0900  146.4100      10.3        84       926        94
VIS    2025250    183200   22.0900  146.3900      10.4        82       926        94
VIS    2025250    183200   22.0800  146.3500      13.2        85       939        99
VIS    2025250    183200   22.0800  146.3000      13.9        84       967        94
VIS    2025250    183200   22.0800  146.3000      13.7        83       967        94
VIS    2025250    183200   22.0700  146.2600      13.7        84       944        97
VIS    2025250    183200   22.0700  146.2400      13.4        86       942        98
VIS    2025250    183200   22.0700  146.2000      12.3        84       932        96
VIS    2025250    183200   22.0900  146.1900      12.3        85       932        99
VIS    2025250    183200   22.0800  146.1600      12.0        81       932        94
VIS    2025250    183200   22.0800  146.1200      10.2        78       928        96
VIS    2025250    183200   22.0700  146.0900       8.9        79       932        90
VIS    2025250    183200   22.0900  146.0500      10.3        81       926        93
VIS    2025250    183200   22.0900  146.0400      10.4        81       926        93
VIS    2025250    183200   22.0600  146.0000      12.2        81       918        97
VIS    2025250    183200   22.0600  145.9800      12.0        84       918        99
VIS    2025250    183200   22.0600  145.9500      11.8        87       918        95
VIS    2025250    183200   22.0800  145.9200      12.4        85       921        91
VIS    2025250    183200   22.0800  145.9100      12.4        85       926        95
VIS    2025250    183200   22.0800  145.8900      12.3        85       941        96
VIS    2025250    183200   22.0600  145.8500      12.5        86       959        98
VIS    2025250    183200   22.0700  145.8400      12.6        86       971        98
VIS    2025250    183200   22.0800  145.8000      14.0        84       953        98
VIS    2025250    183200   22.0700  145.7900      14.4        83       954        97
VIS    2025250    183200   22.0800  145.7500      15.2        84       948        95
VIS    2025250    183200   22.0700  145.7400      14.4        83       960        98
VIS    2025250    183200   22.0600  145.7000      11.7        84       972        95
VIS    2025250    183200   22.0600  145.0900      13.9        86       969        97
VIS    2025250    183200   22.0600  145.0900      14.1        86       969        97
VIS    2025250    183200   22.0500  145.0600      15.0        87       954        96
VIS    2025250    183200   22.0600  145.0300      15.1        86       943        96
VIS    2025250    183200   22.0500  145.0000      15.1        86       942        95
VIS    2025250    183200   22.0700  144.9800      15.3        85       939        95
VIS    2025250    183200   22.0700  144.9600      15.6        85       933        95
VIS    2025250    183200   22.0600  144.9400      15.2        87       926        95
VIS    2025250    183200   22.0500  144.8000      15.5        93       907        93
VIS    2025250    183200   22.0700  144.7900      15.3        92       907        94
VIS    2025250    183200   22.0500  144.6500       9.5       108       887        97
VIS    2025250    183200   22.0600  144.6300      11.6       100       891        93
VIS    2025250    183200   22.0700  144.6100      12.8        94       898        93
VIS    2025250    183200   22.0700  144.5700      14.1        81       905        93
VIS    2025250    183200   22.0500  144.5400      13.4        82       913        96
VIS    2025250    183200   22.0700  144.5400      14.1        78       903        91
VIS    2025250    183200   22.0500  144.4500      12.9        88       917        98
VIS    2025250    183200   22.0600  144.4400      12.3        87       921       100
VIS    2025250    183200   22.0600  144.4100      12.3        86       922        99
VIS    2025250    183200   22.0500  144.3700      12.8        88       921        96
VIS    2025250    183200   22.0500  144.3400      12.3        88       919        99
VIS    2025250    183200   22.0500  144.3400      12.0        89       919        99
VIS    2025250    183200   22.0600  144.3000      11.4        93       919        95
VIS    2025250    183200   22.0700  144.2900      11.6        93       917        91
VIS    2025250    183200   22.0700  144.2600      12.0        91       886        91
VIS    2025250    183200   22.0500  144.1800      11.6        91       862        94
VIS    2025250    183200   22.0600  144.1200      13.7        90       890        92
VIS    2025250    183200   22.0600  144.1000      13.1        94       890        92
VIS    2025250    183200   22.0500  144.0800      11.9        96       862        94
VIS    2025250    183200   22.0700  144.0400      12.3        89       910        96
VIS    2025250    183200   22.0500  144.0100      11.4        94       892        92
VIS    2025250    183200   22.0700  143.9400      13.1        87       870        90
VIS    2025250    183200   22.0500  143.7700      12.1        99       874        90
VIS    2025250    183200   22.0600  143.7600       9.0       101       906        91
VIS    2025250    183200   22.0500  143.6400      12.2        88       884        93
VIS    2025250    183200   22.0500  143.5800      10.8        80       896        92
VIS    2025250    183200   22.0500  143.5500      10.0        83       884        93
VIS    2025250    183200   22.0500  143.3800       8.3        76       884        91
VIS    2025250    183200   22.0600  143.3600       8.2        75       884        90
VIS    2025250    183200   22.0400  143.2600      10.0        83       892        96
VIS    2025250    183200   22.0600  143.2300      11.4        86       876        92
VIS    2025250    183200   22.0400  143.1700       9.6        95       894        90
VIS    2025250    183200   22.0500  143.1500      10.2        95       890        95
VIS    2025250    183200   22.0400  143.1400      10.2        93       894        98
VIS    2025250    183200   22.0500  143.1100      13.0        90       891        93
VIS    2025250    183200   22.0400  143.0400      12.0        89       900        97
VIS    2025250    183200   22.0400  142.9500       9.7        89       908        99
VIS    2025250    183200   22.0400  142.9400       9.8        90       913        99
VIS    2025250    183200   22.0400  142.9200      10.0        79       923        97
VIS    2025250    183200   22.0500  142.8900      10.3        79       923        97
VIS    2025250    183200   22.0400  142.8700      10.6        81       923        98
VIS    2025250    183200   22.0400  142.8400      10.8        81       923        98
VIS    2025250    183200   22.0400  142.8200      11.7        83       925        98
VIS    2025250    183200   22.0500  142.7900      12.5        88       925        93
VIS    2025250    183200   22.0400  142.7500      11.9        88       924        98
VIS    2025250    183200   22.0400  142.7300      11.8        93       922        98
VIS    2025250    183200   22.0500  142.7200      11.3        93       921        98
VIS    2025250    183200   22.0400  142.6900      10.9        89       921       100
VIS    2025250    183200   22.0500  142.6600      10.8        89       920       100
VIS    2025250    183200   22.0600  142.6400      11.1        92       920        98
VIS    2025250    183200   22.0600  142.6200      11.6        92       920        98
VIS    2025250    183200   22.0500  142.5900      12.1        95       920        98
VIS    2025250    183200   22.0300  142.5600      11.9        90       920        99
VIS    2025250    183200   22.0500  142.5300      12.2        90       920        93
VIS    2025250    183200   22.0300  142.4800      11.4        95       921        99
VIS    2025250    183200   22.0300  142.4600      11.6        97       920        98
VIS    2025250    183200   22.0400  142.4500      11.8        96       920        98
VIS    2025250    183200   22.0400  142.4200      12.2        95       921        97
VIS    2025250    183200   22.1200  151.6200       6.9        80       987        94
VIS    2025250    183200   22.1200  151.5900       6.2        83       986        97
VIS    2025250    183200   22.1100  151.2800       6.3        76       945        91
VIS    2025250    183200   22.1300  151.2500       5.7        72       946        93
VIS    2025250    183200   22.0900  149.9100       8.9        96       902        94
VIS    2025250    183200   22.1000  149.9000       8.9        98       881        98
VIS    2025250    183200   22.0900  149.8500       8.7        93       875        98
VIS    2025250    183200   22.1000  149.8500       8.8        95       874        98
VIS    2025250    183200   22.0800  149.2200      10.0        89       963        98
VIS    2025250    183200   22.0900  149.2000       9.5        90       963        99
VIS    2025250    183200   22.1000  149.1700       8.7        87       924        99
VIS    2025250    183200   22.1000  149.1600       8.7        87       921        99
VIS    2025250    183200   22.1000  149.1300       8.9        88       867        92
VIS    2025250    183200   22.0800  149.1000       9.5        95       866        91
VIS    2025250    183200   22.0900  149.0800       9.5        94       866        92
VIS    2025250    183200   22.0800  149.0400       9.6        93       867        93
VIS    2025250    183200   22.0800  149.0300       9.6        93       876        94
VIS    2025250    183200   22.0900  149.0100       9.6        93       867        92
VIS    2025250    183200   22.1000  148.9700       9.4        92       878        95
VIS    2025250    183200   22.0900  148.9600       9.3        93       888        95
VIS    2025250    183200   22.0800  148.9200       9.9        96       892        93
VIS    2025250    183200   22.0700  148.9000       9.9        97       896        94
VIS    2025250    183200   22.0900  148.8700       9.4        96       877        94
VIS    2025250    183200   22.0700  148.8500       9.2        92       877        95
VIS    2025250    183200   22.0900  148.8200       9.4        92       886        95
VIS    2025250    183200   22.0800  148.8000       9.4        90       891        96
VIS    2025250    183200   22.0800  148.7800       9.4        89       879        95
VIS    2025250    183200   22.0900  148.7400       9.0        87       876        98
VIS    2025250    183200   22.0700  148.7100       8.5        89       878        99
VIS    2025250    183200   22.0800  148.6900       8.2        89       877        99
VIS    2025250    183200   22.0700  148.6800       7.9        89       884        98
VIS    2025250    183200   22.0900  148.6300       7.3        87       883        96
VIS    2025250    183200   22.0900  148.6200       7.4        90       876        97
VIS    2025250    183200   22.0800  148.5900       8.1        90       879       100
VIS    2025250    183200   22.0700  148.5600       8.5        87       879        99
VIS    2025250    183200   22.0700  148.5500       8.4        83       875        98
VIS    2025250    183200   22.0800  148.5200       8.1        84       875        97
VIS    2025250    183200   22.0700  148.4900       8.2        85       878        98
VIS    2025250    183200   22.0900  148.4700       8.0        84       876        98
VIS    2025250    183200   22.0700  148.4400       7.7        81       878        97
VIS    2025250    183200   22.0700  148.4100       7.5        82       880        96
VIS    2025250    183200   22.0900  148.3900       7.6        89       880        99
VIS    2025250    183200   22.0800  148.3700       7.8        86       886        95
VIS    2025250    183200   22.0900  148.3500       8.8        84       887        92
VIS    2025250    183200   22.0900  148.3100       9.3        83       919        97
VIS    2025250    183200   22.0800  148.2900       9.4        84       962        99
VIS    2025250    183200   22.0800  148.2700       9.5        84       988        99
VIS    2025250    183200   22.0800  148.1600      10.2        79       931        95
VIS    2025250    183200   22.0600  148.1300      10.3        78       889        93
VIS    2025250    183200   22.0700  148.1200      10.3        79       880        90
VIS    2025250    183200   22.0600  148.0800       9.8        77       879        93
VIS    2025250    183200   22.0700  148.0500       9.5        72       879        92
VIS    2025250    183200   22.0800  148.0400       9.7        73       879        92
VIS    2025250    183200   22.0600  148.0200       9.6        77       915        98
VIS    2025250    183200   22.0700  147.9800       9.3        83       941        98
VIS    2025250    183200   22.0600  147.9500       9.3        86       941        97
VIS    2025250    183200   22.0600  147.9400       9.5        88       926        98
VIS    2025250    183200   22.0800  147.9100       9.3        91       879        94
VIS    2025250    183200   22.0700  147.8700       8.6        86       863        95
VIS    2025250    183200   22.0800  147.8600       8.6        86       863        94
VIS    2025250    183200   22.0800  147.7400       9.9        83       979        99
VIS    2025250    183200   22.0600  147.7200       9.9        85       939        99
VIS    2025250    183200   22.0600  147.7100      10.1        85       931        99
VIS    2025250    183200   22.0600  147.6700      10.3        88       905        99
VIS    2025250    183200   22.0700  147.6600      10.6        86       905        99
VIS    2025250    183200   22.0800  147.6200      10.4        80       915        98
VIS    2025250    183200   22.0600  147.5900       9.9        81       907        96
VIS    2025250    183200   22.0600  147.5600       9.1        87       909        90
VIS    2025250    183200   22.0800  147.4700       9.1        91       941        95
VIS    2025250    183200   22.0600  147.4400      10.2        96       941        96
VIS    2025250    183200   22.0700  147.4100       8.5        93       873        99
VIS    2025250    183200   22.0600  147.3900       7.7       101       782        90
VIS    2025250    183200   22.0600  147.3800       7.6       101       812        93
VIS    2025250    183200   22.0700  147.2400       9.3       121       776        93
VIS    2025250    183200   22.0700  147.0500       9.4        93       862        91
VIS    2025250    183200   22.0600  147.0200      10.4        92       877        96
VIS    2025250    183200   22.0500  146.9900      10.8        89       885        98
VIS    2025250    183200   22.0600  146.9700      10.5        90       885        93
VIS    2025250    183200   22.0500  146.9300      10.0        86       896        97
VIS    2025250    183200   22.0600  146.9300      10.2        88       896        97
VIS    2025250    183200   22.0700  146.9000      10.2        86       899        98
VIS    2025250    183200   22.0700  146.8700       9.6        84       899        96
VIS    2025250    183200   22.0700  146.8400       9.4        84       896        94
VIS    2025250    183200   22.0600  146.8200       9.3        81       896        91
VIS    2025250    183200   22.0600  146.7800       8.7        82       894        97
VIS    2025250    183200   22.0600  146.7600       8.9        84       896        97
VIS    2025250    183200   22.0500  146.7300       9.9        83       937        98
VIS    2025250    183200   22.0500  146.6100      11.0        92       944        97
VIS    2025250    183200   22.0500  146.6000      11.4        90       944        98
VIS    2025250    183200   22.0600  146.5600      12.1        85       944        97
VIS    2025250    183200   22.0600  146.5400      11.1        85       940        98
VIS    2025250    183200   22.0600  146.4700      11.8        89       936        92
VIS    2025250    183200   22.0600  146.4000      10.0        84       959        91
VIS    2025250    183200   22.0600  146.3000      13.7        84       967        92
VIS    2025250    183200   22.0600  146.2800      13.7        83       958        95
VIS    2025250    183200   22.0600  146.2700      13.9        85       958        95
VIS    2025250    183200   22.0500  146.2300      13.2        86       944        94
VIS    2025250    183200   22.0500  146.2200      13.2        85       944        91
VIS    2025250    183200   22.0500  146.1800      12.1        79       934        94
VIS    2025250    183200   22.0500  146.1700      11.4        76       935        94
VIS    2025250    183200   22.0600  146.1500      10.8        76       933        90
VIS    2025250    183200   22.0500  146.0400       9.8        80       918        96
VIS    2025250    183200   22.0500  146.0100      10.6        81       918        92
VIS    2025250    183200   22.0600  145.9800      12.1        83       918        99
VIS    2025250    183200   22.0600  145.9600      11.8        87       921        97
VIS    2025250    183200   22.0400  145.9300      12.7        82       923        96
VIS    2025250    183200   22.0600  145.9200      13.1        84       921        92
VIS    2025250    183200   22.0400  145.8800      13.0        88       932        99
VIS    2025250    183200   22.0500  145.8600      12.4        87       942        98
VIS    2025250    183200   22.0500  145.8300      13.1        86       956        99
VIS    2025250    183200   22.0500  145.8200      13.3        86       956        98
VIS    2025250    183200   22.0500  145.7900      14.1        83       956        98
VIS    2025250    183200   22.0500  145.7700      14.3        82       956        97
VIS    2025250    183200   22.0600  145.7400      13.7        83       961       100
VIS    2025250    183200   22.0400  145.7100      12.7        85       965        97
VIS    2025250    183200   22.0300  145.2000      11.7        88       966        92
VIS    2025250    183200   22.0300  145.1800      12.8        88       968        96
VIS    2025250    183200   22.0400  145.1400      13.7        85       970        95
VIS    2025250    183200   22.0500  145.1300      13.4        85       970        95
VIS    2025250    183200   22.0500  145.1000      13.7        86       969        98
VIS    2025250    183200   22.0300  145.0800      14.1        85       911        96
VIS    2025250    183200   22.0400  145.0400      15.4        87       942        95
VIS    2025250    183200   22.0400  145.0300      15.3        87       940        95
VIS    2025250    183200   22.0400  145.0000      15.0        85       940        96
VIS    2025250    183200   22.0400  144.9700      15.2        84       924        95
VIS    2025250    183200   22.0500  144.7900      15.4        92       909        93
VIS    2025250    183200   22.0300  144.7600      15.3        87       913        93
VIS    2025250    183200   22.0300  144.7500      15.2        86       905        92
VIS    2025250    183200   22.0500  144.6700       8.8       113       894        92
VIS    2025250    183200   22.0300  144.6400       8.8       106       876        94
VIS    2025250    183200   22.0300  144.6000      10.7        92       886        93
VIS    2025250    183200   22.0300  144.5600      13.1        84       910        95
VIS    2025250    183200   22.0200  144.5500      12.5        87       914        97
VIS    2025250    183200   22.0200  144.5300      12.7        87       916        97
VIS    2025250    183200   22.0300  144.5000      13.3        89       916        97
VIS    2025250    183200   22.0400  144.4600      13.3        89       917        98
VIS    2025250    183200   22.0400  144.4500      13.3        87       919        98
VIS    2025250    183200   22.0200  144.4100      12.9        88       921        97
VIS    2025250    183200   22.0300  144.4000      12.6        90       922        95
VIS    2025250    183200   22.0400  144.3800      12.9        89       921        93
VIS    2025250    183200   22.0400  144.3400      11.7        90       918        99
VIS    2025250    183200   22.0400  144.3300      11.4        90       918        99
VIS    2025250    183200   22.0300  144.3000       9.8        98       905        95
VIS    2025250    183200   22.0200  144.2400      10.9        98       887        95
VIS    2025250    183200   22.0400  144.2300      11.9        95       886        95
VIS    2025250    183200   22.0400  144.1700      11.0        89       862        94
VIS    2025250    183200   22.0300  144.1400      12.1        90       881        96
VIS    2025250    183200   22.0300  144.1300      12.8        91       884        95
VIS    2025250    183200   22.0400  144.0900      11.3        98       862        92
VIS    2025250    183200   22.0400  144.0900      11.5        97       862        95
VIS    2025250    183200   22.0400  143.7600      10.0       100       886       100
VIS    2025250    183200   22.0300  143.7400       8.8        96       874        99
VIS    2025250    183200   22.0200  143.7100       9.3        88       884        97
VIS    2025250    183200   22.0200  143.6700      12.4        86       905        95
VIS    2025250    183200   22.0400  143.6500      12.9        85       892        92
VIS    2025250    183200   22.0300  143.6300      11.6        84       892        95
VIS    2025250    183200   22.0400  143.5900      10.8        78       896        92
VIS    2025250    183200   22.0300  143.5700      10.6        80       897        90
VIS    2025250    183200   22.0300  143.3900      12.5        80       892        91
VIS    2025250    183200   22.0100  143.3100      11.6        85       897        94
VIS    2025250    183200   22.0200  143.2700      12.1        84       894        95
VIS    2025250    183200   22.0100  143.2400      12.2        85       895        94
VIS    2025250    183200   22.0300  143.1900      10.2        93       895        90
VIS    2025250    183200   22.0300  143.1900       9.6        94       895        93
VIS    2025250    183200   22.0200  143.1600       8.5        96       895        90
VIS    2025250    183200   22.0100  143.1400       9.7        90       902        92
VIS    2025250    183200   22.0200  143.0800      13.1        92       913        94
VIS    2025250    183200   22.0100  143.0500      12.4        92       916        98
VIS    2025250    183200   22.0300  143.0200      12.3        88       905        94
VIS    2025250    183200   22.0200  143.0100      11.9        86       903        93
VIS    2025250    183200   22.0100  142.9500      10.5        85       923        90
VIS    2025250    183200   22.0300  142.9200      10.2        80       922        95
VIS    2025250    183200   22.0300  142.9000      10.3        79       923        96
VIS    2025250    183200   22.0300  142.8800      10.3        80       923        97
VIS    2025250    183200   22.0100  142.8500      10.8        84       925        99
VIS    2025250    183200   22.0300  142.8200      11.6        82       925        98
VIS    2025250    183200   22.0300  142.8200      11.8        84       926        98
VIS    2025250    183200   22.0200  142.7700      11.9        88       926        99
VIS    2025250    183200   22.0200  142.7500      12.0        90       924        98
VIS    2025250    183200   22.0300  142.7400      11.9        91       924        98
VIS    2025250    183200   22.0200  142.7000      11.8        90       923       100
VIS    2025250    183200   22.0300  142.6800      11.1        90       922       100
VIS    2025250    183200   22.0100  142.6500      10.7        92       921        96
VIS    2025250    183200   22.0100  142.6200      10.7        92       921        96
VIS    2025250    183200   22.0300  142.6100      11.1        94       920        99
VIS    2025250    183200   22.0100  142.5700      11.3        90       921       100
VIS    2025250    183200   22.0100  142.5500      11.6        87       921        99
VIS    2025250    183200   22.0100  142.5400      11.8        87       921        99
VIS    2025250    183200   22.0200  142.5200      11.7        89       920        98
VIS    2025250    183200   22.0200  142.4700      11.4        94       922        98
VIS    2025250    183200   22.0300  142.4500      11.6        96       921        98
VIS    2025250    183200   22.0200  142.4300      11.8        96       922        96
VIS    2025250    183200   22.0200  142.4200      11.7        94       922        98
VIS    2025250    183200   22.1100  151.6200       7.1        82       987        94
VIS    2025250    183200   22.1000  151.5900       6.5        83       970        96
VIS    2025250    183200   22.0700  149.8800       8.3        94       890        98
VIS    2025250    183200   22.0800  149.8700       8.4        93       875        99
VIS    2025250    183200   22.0600  149.2100       9.9        88       934        98
VIS    2025250    183200   22.0600  149.2000       9.6        88       928        98
VIS    2025250    183200   22.0600  149.1700       9.1        89       897        97
VIS    2025250    183200   22.0600  149.1500       9.0        89       882        96
VIS    2025250    183200   22.0600  149.1100       9.4        92       868        94
VIS    2025250    183200   22.0500  149.1000       9.5        94       876        93
VIS    2025250    183200   22.0500  149.0600       9.8        96       877        91
VIS    2025250    183200   22.0700  149.0400       9.7        93       877        94
VIS    2025250    183200   22.0700  149.0300       9.6        92       877        94
VIS    2025250    183200   22.0600  149.0000       9.6        91       892        95
VIS    2025250    183200   22.0500  148.9700       9.9        92       888        94
VIS    2025250    183200   22.0500  148.9300      10.1        96       901        93
VIS    2025250    183200   22.0600  148.9200      10.0        97       903        93
VIS    2025250    183200   22.0500  148.8900       9.7        94       896        95
VIS    2025250    183200   22.0600  148.8700       9.5        94       886        95
VIS    2025250    183200   22.0500  148.8300       9.1        90       877        95
VIS    2025250    183200   22.0600  148.8000       9.2        89       874        94
VIS    2025250    183200   22.0700  148.7800       9.3        87       875        95
VIS    2025250    183200   22.0500  148.7600       8.8        86       875        95
VIS    2025250    183200   22.0500  148.7500       8.7        86       877        97
VIS    2025250    183200   22.0700  148.7100       8.5        88       879        98
VIS    2025250    183200   22.0500  148.6700       8.3        85       890        94
VIS    2025250    183200   22.0500  148.6500       8.0        83       890        98
VIS    2025250    183200   22.0500  148.6200       8.3        82       888        97
VIS    2025250    183200   22.0400  148.6200       8.5        81       890        96
VIS    2025250    183200   22.0500  148.5900       8.4        84       882        98
VIS    2025250    183200   22.0600  148.5500       8.4        84       876        98
VIS    2025250    183200   22.0600  148.5300       8.5        82       875        97
VIS    2025250    183200   22.0600  148.5100       8.5        83       878        97
VIS    2025250    183200   22.0500  148.4700       8.2        85       879        99
VIS    2025250    183200   22.0500  148.4600       7.9        85       879        99
VIS    2025250    183200   22.0600  148.4200       7.6        82       880        96
VIS    2025250    183200   22.0600  148.4200       7.5        82       880        96
VIS    2025250    183200   22.0600  148.3900       7.4        82       887        93
VIS    2025250    183200   22.0500  148.3600       7.8        81       886        93
VIS    2025250    183200   22.0600  148.3400       8.6        82       885        95
VIS    2025250    183200   22.0500  148.3000       9.1        85       897        98
VIS    2025250    183200   22.0600  148.2800       9.3        84       940        98
VIS    2025250    183200   22.0400  148.1600      10.0        73       931        97
VIS    2025250    183200   22.0400  148.1500       9.8        75       945        98
VIS    2025250    183200   22.0600  148.1200      10.2        78       888        94
VIS    2025250    183200   22.0600  148.0800       9.8        77       880        94
VIS    2025250    183200   22.0400  148.0400       9.1        74       915        95
VIS    2025250    183200   22.0600  148.0300       9.7        75       915        97
VIS    2025250    183200   22.0400  147.9800      10.0        86       941        97
VIS    2025250    183200   22.0600  147.9600       9.2        85       941        96
VIS    2025250    183200   22.0400  147.9400       9.1        85       911        99
VIS    2025250    183200   22.0400  147.9200       9.1        85       879        98
VIS    2025250    183200   22.0600  147.8800       8.8        88       863        95
VIS    2025250    183200   22.0300  147.7700       9.9        85       972        95
VIS    2025250    183200   22.0300  147.7600      10.5        85       972        98
VIS    2025250    183200   22.0500  147.7300       9.9        85       966        98
VIS    2025250    183200   22.0500  147.7000      10.0        87       931        99
VIS    2025250    183200   22.0300  147.6700       9.8        90       911        97
VIS    2025250    183200   22.0400  147.6600       9.9        89       911        96
VIS    2025250    183200   22.0400  147.6300      10.1        83       913        93
VIS    2025250    183200   22.0500  147.6000      10.0        81       907        96
VIS    2025250    183200   22.0500  147.5900       9.9        82       907        96
VIS    2025250    183200   22.0400  147.5700       8.7        86       934        90
VIS    2025250    183200   22.0300  147.5000       7.3        91       925        92
VIS    2025250    183200   22.0500  147.4800       8.4        88       935        95
VIS    2025250    183200   22.0300  147.4700       9.6        91       929        98
VIS    2025250    183200   22.0400  147.2400       9.2       111       845        97
VIS    2025250    183200   22.0400  147.0200      10.2        88       878        96
VIS    2025250    183200   22.0200  147.0100      10.8        84       894        97
VIS    2025250    183200   22.0300  146.9800      10.3        85       891        97
VIS    2025250    183200   22.0300  146.9600       9.9        84       891        97
VIS    2025250    183200   22.0300  146.9400       9.8        83       896        97
VIS    2025250    183200   22.0200  146.9100       9.9        87       898        97
VIS    2025250    183200   22.0200  146.8800       9.7        87       901        99
VIS    2025250    183200   22.0300  146.8600       9.6        82       901        98
VIS    2025250    183200   22.0300  146.8300       9.7        82       899        98
VIS    2025250    183200   22.0200  146.7900       9.1        86       899        96
VIS    2025250    183200   22.0200  146.7700       9.2        86       921        96
VIS    2025250    183200   22.0200  146.7400      10.6        84       957        97
VIS    2025250    183200   22.0200  146.7300      10.8        84       957        98
VIS    2025250    183200   22.0200  146.6200      12.4        89       978        98
VIS    2025250    183200   22.0400  146.6000      11.3        90       950        98
VIS    2025250    183200   22.0200  146.5800      12.2        86       950        99
VIS    2025250    183200   22.0400  146.5500      11.5        84       944        98
VIS    2025250    183200   22.0400  146.2400      13.5        86       958        93
VIS    2025250    183200   22.0300  146.1800      11.8        77       945        94
VIS    2025250    183200   22.0400  146.1400      10.3        70       939        91
VIS    2025250    183200   22.0300  146.0500      10.3        79       918        94
VIS    2025250    183200   22.0100  146.0100      13.1        80       935        94
VIS    2025250    183200   22.0300  146.0000      13.8        78       936        94
VIS    2025250    183200   22.0100  145.9700      13.7        82       948        96
VIS    2025250    183200   22.0100  145.9500      13.5        83       931        97
VIS    2025250    183200   22.0200  145.9200      13.1        78       926        98
VIS    2025250    183200   22.0300  145.8900      13.2        85       931       100
VIS    2025250    183200   22.0200  145.8600      13.7        85       934        98
VIS    2025250    183200   22.0200  145.8500      14.1        81       934        96
VIS    2025250    183200   22.0300  145.8100      13.7        83       940        96
VIS    2025250    183200   22.0200  145.8000      13.9        82       940        97
VIS    2025250    183200   22.0200  145.7700      13.3        83       940        98
VIS    2025250    183200   22.0300  145.7500      13.3        82       945        99
VIS    2025250    183200   22.0100  145.7100      14.0        80       942        97
VIS    2025250    183200   22.0300  145.7000      13.2        84       966        96
VIS    2025250    183200   22.0300  145.1900      12.3        88       966        95
VIS    2025250    183200   22.0100  145.1700      13.6        87       966        97
VIS    2025250    183200   22.0200  145.1500      14.1        86       968        97
VIS    2025250    183200   22.0000  145.1200      14.3        84       913        95
VIS    2025250    183200   22.0100  145.0900      14.5        84       906        95
VIS    2025250    183200   22.0000  145.0800      14.6        86       911        95
VIS    2025250    183200   22.0200  145.0500      15.3        88       928        95
VIS    2025250    183200   22.0200  145.0200      15.3        88       928        95
VIS    2025250    183200   22.0100  145.0000      15.0        89       911        94
VIS    2025250    183200   22.0200  144.7900      15.5        90       909        93
VIS    2025250    183200   22.0100  144.7600      15.2        89       901        90
VIS    2025250    183200   22.0100  144.7500      15.1        88       901        91
VIS    2025250    183200   22.0200  144.6900       9.5       107       903        92
VIS    2025250    183200   22.0200  144.6600      10.2       105       875        96
VIS    2025250    183200   22.0200  144.6500       9.1       106       876        96
VIS    2025250    183200   22.0000  144.5900      11.8        84       883        90
VIS    2025250    183200   22.0200  144.5600      12.5        86       913        96
VIS    2025250    183200   22.0200  144.5400      12.4        88       916        97
VIS    2025250    183200   22.0100  144.5100      13.3        89       916        97
VIS    2025250    183200   22.0000  144.4900      13.9        86       916        95
VIS    2025250    183200   22.0100  144.4600      14.3        87       915        94
VIS    2025250    183200   22.0000  144.4400      14.5        85       915        95
VIS    2025250    183200   22.0000  144.4200      13.4        89       915        98
VIS    2025250    183200   22.0000  144.3900      11.1       100       914        96
VIS    2025250    183200   22.0000  144.3200       9.3       109       869        95
VIS    2025250    183200   22.0200  144.2900      10.0       100       893        92
VIS    2025250    183200   22.0100  143.7100       8.9        90       860        95
VIS    2025250    183200   22.0100  143.6800      11.3        85       905        97
VIS    2025250    183200   22.0000  143.6700      11.7        84       905        94
VIS    2025250    183200   22.0000  143.6500      11.9        88       912        99
VIS    2025250    183200   21.9900  143.6200      10.7        91       912        99
VIS    2025250    183200   22.0000  143.5400       9.4        83       897        90
VIS    2025250    183200   22.0000  143.4100      11.3        83       895        92
VIS    2025250    183200   22.0100  143.4100      11.8        83       895        91
VIS    2025250    183200   21.9900  143.3800      12.3        82       890        92
VIS    2025250    183200   22.0000  143.3300      11.9        83       895        91
VIS    2025250    183200   22.0000  143.3000      11.9        85       895        92
VIS    2025250    183200   22.0100  143.2600      12.1        84       895        94
VIS    2025250    183200   21.9900  143.2500      11.8        84       895        96
VIS    2025250    183200   22.0100  143.2300      12.3        85       903        95
VIS    2025250    183200   22.0100  143.1900      10.8        89       907        95
VIS    2025250    183200   22.0000  143.1300      11.0        90       912        94
VIS    2025250    183200   22.0000  143.0900      13.1        93       918        95
VIS    2025250    183200   22.0000  143.0700      13.1        91       918        97
VIS    2025250    183200   21.9900  143.0500      12.4        89       918        99
VIS    2025250    183200   21.9900  143.0200      12.3        89       922        99
VIS    2025250    183200   22.0000  143.0100      12.2        88       919        97
VIS    2025250    183200   22.0000  142.9600      11.8        87       923        91
VIS    2025250    183200   21.9900  142.9600      12.1        88       923        94
VIS    2025250    183200   22.0100  142.9200      11.1        89       924        99
VIS    2025250    183200   21.9900  142.8900      11.2        88       925       100
VIS    2025250    183200   21.9900  142.8800      10.8        89       925       100
VIS    2025250    183200   21.9900  142.8400      10.9        89       927        99
VIS    2025250    183200   22.0000  142.8300      10.9        88       927        99
VIS    2025250    183200   21.9900  142.7900      11.0        91       927        97
VIS    2025250    183200   21.9900  142.7600      12.1        89       927        97
VIS    2025250    183200   22.0000  142.7400      12.6        88       924        97
VIS    2025250    183200   21.9900  142.7300      12.5        88       924        98
VIS    2025250    183200   21.9800  142.7100      12.0        89       924        99
VIS    2025250    183200   22.0000  142.6800      11.2        89       923        99
VIS    2025250    183200   22.0000  142.6400      10.3        92       922        95
VIS    2025250    183200   22.0000  142.6300      10.4        92       921        95
VIS    2025250    183200   22.0000  142.6000      10.8        93       921        98
VIS    2025250    183200   21.9800  142.5700      11.5        91       921        99
VIS    2025250    183200   22.0000  142.5500      11.6        86       921       100
VIS    2025250    183200   21.9800  142.5200      12.7        89       923        97
VIS    2025250    183200   21.9900  142.4900      12.2        92       923        91
VIS    2025250    183200   22.0000  142.4600      11.5        95       923        92
VIS    2025250    183200   21.9900  142.4200      11.0        94       924        99
VIS    2025250    183200   21.9900  142.4100      11.0        91       924        99
VIS    2025250    183200   22.0900  151.6200       6.9        86       970        96
VIS    2025250    183200   22.0600  151.2800       6.6        78       991        91
VIS    2025250    183200   22.0400  149.8600       8.4        93       915        95
VIS    2025250    183200   22.0300  149.2200       9.6        87       934        98
VIS    2025250    183200   22.0500  149.2000       9.6        88       907        96
VIS    2025250    183200   22.0300  149.1900       9.7        87       897        95
VIS    2025250    183200   22.0400  149.1500       9.2        92       879        96
VIS    2025250    183200   22.0400  149.1400       9.3        92       876        95
VIS    2025250    183200   22.0300  149.1000       9.4        94       876        94
VIS    2025250    183200   22.0400  149.0900       9.4        94       876        94
VIS    2025250    183200   22.0400  149.0500      10.0        95       891        92
VIS    2025250    183200   22.0300  149.0200       9.9        95       893        92
VIS    2025250    183200   22.0300  148.9900       9.6        91       897        95
VIS    2025250    183200   22.0300  148.9700       9.9        91       897        94
VIS    2025250    183200   22.0400  148.9600       9.9        92       894        94
VIS    2025250    183200   22.0400  148.9300      10.1        96       903        93
VIS    2025250    183200   22.0400  148.8900       9.8        95       896        94
VIS    2025250    183200   22.0200  148.8700       9.4        91       877        95
VIS    2025250    183200   22.0400  148.8600       9.2        90       877        95
VIS    2025250    183200   22.0400  148.8400       9.0        89       877        95
VIS    2025250    183200   22.0400  148.7900       8.7        87       868        94
VIS    2025250    183200   22.0400  148.7700       8.7        86       866        94
VIS    2025250    183200   22.0400  148.7500       8.7        86       879        96
VIS    2025250    183200   22.0400  148.7300       8.7        86       884        94
VIS    2025250    183200   22.0400  148.6900       8.4        84       891        91
VIS    2025250    183200   22.0300  148.6700       8.7        82       890        91
VIS    2025250    183200   22.0200  148.6400       8.5        79       888        91
VIS    2025250    183200   22.0300  148.6200       8.5        80       890        93
VIS    2025250    183200   22.0300  148.6100       8.7        81       891        93
VIS    2025250    183200   22.0300  148.5600       8.4        80       882        95
VIS    2025250    183200   22.0400  148.5400       8.2        81       882        95
VIS    2025250    183200   22.0300  148.5100       8.7        82       881        97
VIS    2025250    183200   22.0200  148.5000       8.7        83       886        97
VIS    2025250    183200   22.0200  148.4600       7.8        82       895        96
VIS    2025250    183200   22.0400  148.4400       7.6        85       884        98
VIS    2025250    183200   22.0400  148.4100       7.5        86       887        92
VIS    2025250    183200   22.0300  148.3800       7.4        83       889        92
VIS    2025250    183200   22.0300  148.3600       7.7        82       887        96
VIS    2025250    183200   22.0200  148.3300       7.9        86       887        99
VIS    2025250    183200   22.0200  148.3200       8.1        86       888        99
VIS    2025250    183200   22.0300  148.2900       9.1        85       901        97
VIS    2025250    183200   22.0300  148.1500       9.9        76       959        98
VIS    2025250    183200   22.0300  148.0300       9.8        79       958        96
VIS    2025250    183200   22.0200  148.0100      10.5        85       970        99
VIS    2025250    183200   22.0300  147.9300       9.1        83       911        98
VIS    2025250    183200   22.0100  147.7400      11.0        85       970        99
VIS    2025250    183200   22.0100  147.7100      10.1        87       950        98
VIS    2025250    183200   22.0100  147.7100       9.9        88       939        98
VIS    2025250    183200   22.0300  147.6800       9.7        90       911        98
VIS    2025250    183200   22.0300  147.6600      10.0        89       911        93
VIS    2025250    183200   22.0300  147.5900       8.4        85       938        91
VIS    2025250    183200   22.0300  147.5800       8.3        84       938        91
VIS    2025250    183200   22.0000  147.5100       7.0        96       925        90
VIS    2025250    183200   22.0100  147.5000       6.9        96       925        91
VIS    2025250    183200   22.0000  147.4700       8.3        84       903        97
VIS    2025250    183200   22.0200  147.2600       9.4        95       863        96
VIS    2025250    183200   22.0000  147.2400       9.1        92       810        94
VIS    2025250    183200   22.0200  147.2200       8.8       100       793        92
VIS    2025250    183200   22.0200  147.0600       7.1        93       791        90
VIS    2025250    183200   22.0000  147.0300       9.6        87       888        95
VIS    2025250    183200   22.0200  147.0100      10.9        84       894        97
VIS    2025250    183200   22.0000  146.9900      11.5        82       899        97
VIS    2025250    183200   22.0000  146.9500      10.1        80       901        98
VIS    2025250    183200   22.0200  146.9300       9.7        83       896        96
VIS    2025250    183200   22.0200  146.9100       9.9        86       898        94
VIS    2025250    183200   22.0000  146.8900       9.9        92       902        94
VIS    2025250    183200   22.0000  146.8500       9.5        89       901        91
VIS    2025250    183200   22.0000  146.8300       9.4        89       901        90
VIS    2025250    183200   22.0000  146.8200       9.3        90       901        90
VIS    2025250    183200   22.0200  146.7800       9.4        87       921        96
VIS    2025250    183200   22.0000  146.7700      11.2        87       957        95
VIS    2025250    183200   22.0100  146.7300      11.3        85       959        98
VIS    2025250    183200   22.0100  146.7200      11.5        85       959        98
VIS    2025250    183200   21.9900  146.1700      10.9        74       978        92
VIS    2025250    183200   22.0100  146.0400      11.3        80       915        90
VIS    2025250    183200   21.9900  146.0300      12.3        85       918        95
VIS    2025250    183200   22.0000  145.9900      13.5        84       947        96
VIS    2025250    183200   22.0000  145.9800      13.9        83       948        96
VIS    2025250    183200   21.9900  145.9400      14.5        81       931        97
VIS    2025250    183200   21.9900  145.9200      13.9        81       931        98
VIS    2025250    183200   21.9900  145.9000      13.8        80       931        98
VIS    2025250    183200   22.0000  145.8800      14.2        80       931        96
VIS    2025250    183200   21.9900  145.8500      14.3        74       928        95
VIS    2025250    183200   22.0000  145.8100      15.0        76       931        91
VIS    2025250    183200   22.0000  145.7900      13.7        82       937        99
VIS    2025250    183200   22.0100  145.7800      13.5        82       940        98
VIS    2025250    183200   22.0000  145.7600      13.5        79       937        95
VIS    2025250    183200   21.9800  145.3000      11.6        84       988        96
VIS    2025250    183200   21.9800  145.2100      13.2        82       921        98
VIS    2025250    183200   21.9900  145.1800      13.8        87       924        97
VIS    2025250    183200   21.9800  145.1600      14.6        88       914        96
VIS    2025250    183200   21.9800  145.1200      15.0        86       913        95
VIS    2025250    183200   21.9800  145.1100      14.9        86       909        94
VIS    2025250    183200   22.0000  145.0800      14.7        87       911        95
VIS    2025250    183200   21.9800  145.0700      14.8        87       906        94
VIS    2025250    183200   21.9900  145.0300      15.0        89       911        94
VIS    2025250    183200   21.9900  145.0100      15.4        92       901        92
VIS    2025250    183200   22.0000  144.7800      15.5        90       901        90
VIS    2025250    183200   22.0000  144.7700      15.7        91       901        90
VIS    2025250    183200   22.0000  144.7200      11.0       101       898        92
VIS    2025250    183200   21.9800  144.6800      11.1       113       856        91
VIS    2025250    183200   21.9900  144.6600      10.1       108       862        92
VIS    2025250    183200   21.9900  144.6400       8.1       110       862        94
VIS    2025250    183200   21.9800  144.5500      12.2        87       910        98
VIS    2025250    183200   21.9800  144.5000      13.6        86       916        96
VIS    2025250    183200   21.9900  144.4800      14.3        84       915        95
VIS    2025250    183200   21.9900  144.4600      13.9        85       915        96
VIS    2025250    183200   21.9900  144.4300      13.1        90       915        98
VIS    2025250    183200   21.9900  144.4000      10.7       100       914        96
VIS    2025250    183200   21.9900  144.4000      10.3       103       914        93
VIS    2025250    183200   21.9900  144.2000      11.4        91       861        92
VIS    2025250    183200   21.9700  143.9400      11.4        95       852        92
VIS    2025250    183200   21.9700  143.9200      12.1        91       877        94
VIS    2025250    183200   21.9700  143.6600      11.6        88       907        99
VIS    2025250    183200   21.9900  143.6300      11.1        91       915        99
VIS    2025250    183200   21.9900  143.6200      10.1        91       912       100
VIS    2025250    183200   21.9700  143.4000      11.6        83       890        91
VIS    2025250    183200   21.9800  143.4000      11.8        83       890        92
VIS    2025250    183200   21.9600  143.3500      11.9        81       899        91
VIS    2025250    183200   21.9700  143.3500      11.7        81       899        91
VIS    2025250    183200   21.9700  143.2900      12.7        84       893        91
VIS    2025250    183200   21.9800  143.2500      11.4        83       895        95
VIS    2025250    183200   21.9700  143.2200      12.8        86       910        95
VIS    2025250    183200   21.9600  143.1900      13.8        89       913        95
VIS    2025250    183200   21.9600  143.1600      13.7        88       913        95
VIS    2025250    183200   21.9800  143.1300      12.3        88       914        97
VIS    2025250    183200   21.9700  143.1100      12.9        88       919        98
VIS    2025250    183200   21.9800  143.0900      12.9        89       919        98
VIS    2025250    183200   21.9800  143.0700      12.8        89       919        98
VIS    2025250    183200   21.9600  143.0300      12.6        86       923        97
VIS    2025250    183200   21.9600  143.0300      12.8        86       923        97
VIS    2025250    183200   21.9700  142.9800      12.7        89       924        98
VIS    2025250    183200   21.9700  142.9800      12.3        89       924        98
VIS    2025250    183200   21.9800  142.9300      12.8        87       924        96
VIS    2025250    183200   21.9600  142.9100      12.5        87       925        98
VIS    2025250    183200   21.9800  142.8800      11.3        88       925       100
VIS    2025250    183200   21.9700  142.8600      11.0        89       927       100
VIS    2025250    183200   21.9700  142.8300      10.9        94       933        98
VIS    2025250    183200   21.9600  142.8100      11.0        97       929        97
VIS    2025250    183200   21.9600  142.7900      11.1        97       929        97
VIS    2025250    183200   21.9600  142.7700      11.9        92       928        97
VIS    2025250    183200   21.9700  142.7300      12.5        87       924        97
VIS    2025250    183200   21.9700  142.7300      12.2        88       924        97
VIS    2025250    183200   21.9600  142.6800      11.4        88       923        97
VIS    2025250    183200   21.9600  142.6700      11.4        89       923        97
VIS    2025250    183200   21.9600  142.6300      11.1        92       923        99
VIS    2025250    183200   21.9700  142.6200      10.4        94       923        97
VIS    2025250    183200   21.9700  142.6000      11.0        96       922        98
VIS    2025250    183200   21.9800  142.5600      11.8        92       921        97
VIS    2025250    183200   21.9600  142.5300      12.5        90       923        98
VIS    2025250    183200   21.9600  142.5300      12.5        89       923        98
VIS    2025250    183200   21.9700  142.5100      12.8        90       923        95
VIS    2025250    183200   21.9800  142.4700      11.8        94       924        92
VIS    2025250    183200   21.9800  142.4500      11.5        94       924        97
VIS    2025250    183200   21.9700  142.4100      11.0        92       924        99
VIS    2025250    183200   22.0100  149.5300       9.0        80       989        91
VIS    2025250    183200   22.0100  149.3700       9.5        80       978        90
VIS    2025250    183200   22.0000  149.2400       9.1        87       930        99
VIS    2025250    183200   22.0100  149.2200       9.6        87       891        95
VIS    2025250    183200   22.0100  149.2100       9.7        87       891        95
VIS    2025250    183200   22.0000  149.1700       9.7        90       883        94
VIS    2025250    183200   22.0200  149.1500       9.3        91       878        95
VIS    2025250    183200   22.0100  149.1200       9.4        91       877        95
VIS    2025250    183200   22.0200  149.1100       9.3        93       876        95
VIS    2025250    183200   22.0100  149.0800       9.7        92       887        94
VIS    2025250    183200   22.0000  149.0600      10.0        93       897        94
VIS    2025250    183200   22.0100  149.0200       9.8        93       900        95
VIS    2025250    183200   22.0100  148.9900       9.7        88       899        96
VIS    2025250    183200   22.0000  148.9700       9.9        86       899        95
VIS    2025250    183200   22.0200  148.9400      10.4        93       903        94
VIS    2025250    183200   22.0100  148.9100      10.2        93       901        94
VIS    2025250    183200   22.0100  148.8800       9.7        92       879        94
VIS    2025250    183200   22.0000  148.8600       8.9        85       868        96
VIS    2025250    183200   22.0100  148.8300       8.4        85       866        97
VIS    2025250    183200   22.0100  148.8200       8.0        86       866        97
VIS    2025250    183200   22.0100  148.8000       7.9        89       869        98
VIS    2025250    183200   22.0000  148.7700       7.8        90       877        98
VIS    2025250    183200   22.0000  148.7400       8.0        87       887        97
VIS    2025250    183200   22.0000  148.7100       8.8        81       896        93
VIS    2025250    183200   22.0000  148.6900       8.9        79       896        91
VIS    2025250    183200   22.0100  148.6700       8.9        80       891        91
VIS    2025250    183200   22.0100  148.5800       8.3        81       899        94
VIS    2025250    183200   21.9900  148.5600       8.9        81       904        97
VIS    2025250    183200   22.0100  148.5400       8.3        80       904        95
VIS    2025250    183200   22.0100  148.5100       8.8        83       898        96
VIS    2025250    183200   22.0100  148.5000       8.7        83       886        97
VIS    2025250    183200   22.0100  148.4700       7.9        82       895        97
VIS    2025250    183200   22.0000  148.4400       7.3        82       913        90
VIS    2025250    183200   22.0100  148.4200       7.3        84       893        93
VIS    2025250    183200   21.9900  148.3800       7.0        83       891        94
VIS    2025250    183200   22.0100  148.3700       7.4        84       890        96
VIS    2025250    183200   22.0000  148.3300       7.7        86       890        95
VIS    2025250    183200   22.0100  148.3200       7.9        85       889        97
VIS    2025250    183200   22.0100  148.2900       8.4        86       896        96
VIS    2025250    183200   22.0100  148.0100      10.5        86       976        98
VIS    2025250    183200   21.9800  147.7700      10.6        84       977        92
VIS    2025250    183200   22.0000  147.7100      10.1        87       950        97
VIS    2025250    183200   22.0000  147.6900       9.7        88       950        94
VIS    2025250    183200   21.9800  147.6600      10.1        88       961        92
VIS    2025250    183200   21.9800  147.6500      10.1        88       961        92
VIS    2025250    183200   21.9800  147.5600       7.8        89       944        94
VIS    2025250    183200   21.9900  147.4900       7.9        89       903        97
VIS    2025250    183200   22.0000  147.3300      10.3       110       815        91
VIS    2025250    183200   21.9800  147.3000      11.0       104       870        95
VIS    2025250    183200   21.9900  147.2500       9.5        89       819        91
VIS    2025250    183200   21.9700  147.1200       9.9       119       801        97
VIS    2025250    183200   21.9900  147.0900       7.1       121       808        92
VIS    2025250    183200   21.9800  147.0500       8.8        89       882        97
VIS    2025250    183200   21.9900  147.0400       9.3        88       882        96
VIS    2025250    183200   21.9900  147.0000      11.3        82       901        96
VIS    2025250    183200   21.9800  146.9700      11.0        80       904        96
VIS    2025250    183200   21.9700  146.9700      10.6        80       907        94
VIS    2025250    183200   21.9700  146.9300       9.0        84       904        95
VIS    2025250    183200   21.9700  146.9100      10.0        90       908        96
VIS    2025250    183200   21.9700  146.8800      10.3        89       920        91
VIS    2025250    183200   21.9900  146.8200       9.4        90       908        90
VIS    2025250    183200   21.9900  146.7700      12.1        87       963        96
VIS    2025250    183200   21.9900  146.7500      12.6        86       978        96
VIS    2025250    183200   21.9700  146.6900      13.5        87       989        97
VIS    2025250    183200   21.9700  146.2100      10.3        86       999        92
VIS    2025250    183200   21.9800  146.1900      11.0        81       978        96
VIS    2025250    183200   21.9800  146.1800      10.8        77       978        93
VIS    2025250    183200   21.9800  146.0900      12.8        82       913        93
VIS    2025250    183200   21.9800  146.0700      13.1        83       913        93
VIS    2025250    183200   21.9600  146.0500      14.8        86       915        92
VIS    2025250    183200   21.9800  146.0100      13.5        85       942        98
VIS    2025250    183200   21.9600  145.9900      14.4        86       947        98
VIS    2025250    183200   21.9700  145.9700      15.2        85       969        97
VIS    2025250    183200   21.9800  145.9500      15.2        83       936        96
VIS    2025250    183200   21.9800  145.9300      14.6        81       931        97
VIS    2025250    183200   21.9600  145.9000      14.6        82       931        97
VIS    2025250    183200   21.9600  145.8600      12.6        80       926        98
VIS    2025250    183200   21.9700  145.8300      13.8        79       926        98
VIS    2025250    183200   21.9600  145.8200      13.2        84       923        96
VIS    2025250    183200   21.9600  145.7900      11.8        90       881        90
VIS    2025250    183200   21.9800  145.6800      12.9        87       942        90
VIS    2025250    183200   21.9600  145.4400      13.6        80       985        94
VIS    2025250    183200   21.9600  145.3900      14.8        78       985        97
VIS    2025250    183200   21.9600  145.3600      14.3        82       978        96
VIS    2025250    183200   21.9600  145.3500      13.2        81       971        95
VIS    2025250    183200   21.9700  145.3100      13.3        78       975        99
VIS    2025250    183200   21.9700  145.2800      13.1        79       960        99
VIS    2025250    183200   21.9500  145.2700      14.2        78       933        95
VIS    2025250    183200   21.9600  145.2400      14.3        82       921        94
VIS    2025250    183200   21.9500  145.2100      14.1        80       918        96
VIS    2025250    183200   21.9600  145.1800      14.4        85       919        97
VIS    2025250    183200   21.9700  145.1600      14.7        87       918        96
VIS    2025250    183200   21.9600  145.1500      14.9        87       914        95
VIS    2025250    183200   21.9500  145.1100      14.6        88       909        94
VIS    2025250    183200   21.9500  144.6600      11.3       105       831        95
VIS    2025250    183200   21.9500  144.5600      11.7        88       865        91
VIS    2025250    183200   21.9500  144.5500      12.0        88       865        91
VIS    2025250    183200   21.9500  144.5300      13.0        86       910        97
VIS    2025250    183200   21.9500  144.4900      13.4        86       915        95
VIS    2025250    183200   21.9500  144.4600      12.3        92       910        96
VIS    2025250    183200   21.9600  144.4500      12.3        91       910        97
VIS    2025250    183200   21.9600  144.2500      11.4        99       898        98
VIS    2025250    183200   21.9400  144.0300      11.9        96       870        96
VIS    2025250    183200   21.9500  143.9800      10.0        97       863        92
VIS    2025250    183200   21.9400  143.9500      12.4        86       894        90
VIS    2025250    183200   21.9400  143.9100      12.7        87       902        96
VIS    2025250    183200   21.9400  143.8900      11.9        86       877        93
VIS    2025250    183200   21.9400  143.7000      11.8        90       886        96
VIS    2025250    183200   21.9600  143.6800      11.4        85       891        92
VIS    2025250    183200   21.9600  143.3600      12.2        82       899        93
VIS    2025250    183200   21.9600  143.3600      12.1        82       899        92
VIS    2025250    183200   21.9600  143.3100      12.9        83       896        93
VIS    2025250    183200   21.9400  143.2900      12.7        83       896        93
VIS    2025250    183200   21.9400  143.2800      12.4        82       896        93
VIS    2025250    183200   21.9500  143.2300      12.0        85       912        90
VIS    2025250    183200   21.9400  143.1900      13.9        89       917        94
VIS    2025250    183200   21.9400  143.1800      14.0        89       917        94
VIS    2025250    183200   21.9400  143.1400      14.0        90       917        95
VIS    2025250    183200   21.9400  143.1200      13.3        89       919        97
VIS    2025250    183200   21.9500  143.0900      12.7        87       920        98
VIS    2025250    183200   21.9400  143.0600      12.2        86       922        98
VIS    2025250    183200   21.9400  143.0600      12.1        86       923        98
VIS    2025250    183200   21.9500  143.0200      13.1        86       926        94
VIS    2025250    183200   21.9500  143.0100      13.6        87       934        94
VIS    2025250    183200   21.9400  142.9700      14.3        89       934        95
VIS    2025250    183200   21.9400  142.9400      14.2        88       934        96
VIS    2025250    183200   21.9400  142.9200      13.7        88       934        97
VIS    2025250    183200   21.9400  142.9100      13.2        88       934        98
VIS    2025250    183200   21.9300  142.8800      12.1        87       935       100
VIS    2025250    183200   21.9300  142.8600      11.4        87       935       100
VIS    2025250    183200   21.9400  142.8200      11.1        96       934        97
VIS    2025250    183200   21.9500  142.8100      11.1        97       934        97
VIS    2025250    183200   21.9300  142.7800      11.1        95       935        96
VIS    2025250    183200   21.9500  142.7400      11.9        89       927        96
VIS    2025250    183200   21.9500  142.7300      12.1        88       924        95
VIS    2025250    183200   21.9500  142.7100      11.4        89       923        97
VIS    2025250    183200   21.9500  142.6700      11.6        90       923        97
VIS    2025250    183200   21.9300  142.6400      12.7        91       925        98
VIS    2025250    183200   21.9300  142.6400      12.8        91       925        98
VIS    2025250    183200   21.9400  142.6000      12.4        93       925        97
VIS    2025250    183200   21.9300  142.5700      12.4        97       925        97
VIS    2025250    183200   21.9300  142.5400      12.5        93       928        98
VIS    2025250    183200   21.9400  142.5400      12.5        91       928        98
VIS    2025250    183200   21.9300  142.5100      11.8        85       933        98
VIS    2025250    183200   21.9300  142.4800      11.9        88       925        98
VIS    2025250    183200   21.9300  142.4600      11.8        90       924       100
VIS    2025250    183200   21.9400  142.4200      11.8        93       924        99
VIS    2025250    183200   21.9300  142.4100      11.8        92       924        98
VIS    2025250    183200   22.0000  149.5400       8.7        81       991        90
VIS    2025250    183200   21.9800  149.2500       9.2        89       913        98
VIS    2025250    183200   21.9800  149.2400       9.3        88       894        97
VIS    2025250    183200   21.9800  149.2100       9.7        87       884        94
VIS    2025250    183200   21.9900  149.1800       9.9        90       883        94
VIS    2025250    183200   22.0000  149.1600       9.8        91       883        94
VIS    2025250    183200   21.9900  149.1400       9.5        91       877        94
VIS    2025250    183200   21.9900  149.1100       9.5        90       879        95
VIS    2025250    183200   21.9900  149.0800       9.9        91       887        94
VIS    2025250    183200   21.9800  149.0600      10.0        90       898        95
VIS    2025250    183200   21.9800  149.0300       9.9        88       901        95
VIS    2025250    183200   21.9900  148.9900      10.0        88       899        95
VIS    2025250    183200   21.9900  148.9900       9.9        87       899        95
VIS    2025250    183200   21.9800  148.9500      10.1        87       901        95
VIS    2025250    183200   21.9700  148.9200      10.0        89       893        94
VIS    2025250    183200   21.9700  148.9000       9.9        88       877        94
VIS    2025250    183200   21.9700  148.8700       8.9        83       867        94
VIS    2025250    183200   21.9800  148.8600       8.9        84       867        95
VIS    2025250    183200   21.9800  148.8300       7.5        86       866        98
VIS    2025250    183200   21.9700  148.8000       6.9        88       883        99
VIS    2025250    183200   21.9800  148.7600       7.3        90       886       100
VIS    2025250    183200   21.9700  148.7600       7.3        88       886        99
VIS    2025250    183200   21.9900  148.7400       8.0        86       887        98
VIS    2025250    183200   21.9800  148.7000       8.4        79       896        95
VIS    2025250    183200   21.9800  148.6600       8.5        78       898        93
VIS    2025250    183200   21.9800  148.6600       8.3        79       898        93
VIS    2025250    183200   21.9700  148.5900       9.1        81       906        95
VIS    2025250    183200   21.9900  148.5600       9.0        81       904        97
VIS    2025250    183200   21.9800  148.5500       9.0        82       916        97
VIS    2025250    183200   21.9800  148.5100       8.7        83       932        93
VIS    2025250    183200   21.9700  148.5000       8.6        83       941        93
VIS    2025250    183200   21.9900  148.4600       7.5        81       914        90
VIS    2025250    183200   21.9900  148.4600       7.4        81       914        90
VIS    2025250    183200   21.9700  148.4100       7.1        80       910        92
VIS    2025250    183200   21.9800  148.4000       7.0        81       902        91
VIS    2025250    183200   21.9900  148.3600       7.2        84       897        95
VIS    2025250    183200   21.9600  148.3500       7.3        80       898        96
VIS    2025250    183200   21.9800  148.3300       7.5        81       897        91
VIS    2025250    183200   21.9700  148.2800       8.5        78       895        95
VIS    2025250    183200   21.9600  148.2600       9.1        77       897        95
VIS    2025250    183200   21.9600  148.0600      11.2        79       998        98
VIS    2025250    183200   21.9600  148.0300      11.0        79       983        98
VIS    2025250    183200   21.9800  147.7800      10.8        83       977        90
VIS    2025250    183200   21.9700  147.6500      10.2        87       961        92
VIS    2025250    183200   21.9800  147.6500      10.1        87       961        93
VIS    2025250    183200   21.9600  147.5900       9.1        92       936        96
VIS    2025250    183200   21.9600  147.5600       9.3        96       866        97
VIS    2025250    183200   21.9700  147.5500       8.4        91       943        93
VIS    2025250    183200   21.9500  147.5100       9.2        94       805        91
VIS    2025250    183200   21.9700  147.3400      10.0       102       845        93
VIS    2025250    183200   21.9700  147.3100      10.7       103       870        96
VIS    2025250    183200   21.9700  147.2300       9.3        92       810        92
VIS    2025250    183200   21.9700  147.2100       8.5        91       777        90
VIS    2025250    183200   21.9500  147.1800       8.3        99       754        95
VIS    2025250    183200   21.9500  147.1600       9.1       102       751        94
VIS    2025250    183200   21.9500  147.1200       9.2       103       801        96
VIS    2025250    183200   21.9600  147.1200       9.1       108       801        97
VIS    2025250    183200   21.9500  147.0900       8.2       103       878        93
VIS    2025250    183200   21.9600  147.0700       7.9        96       882        92
VIS    2025250    183200   21.9500  147.0400       8.7        90       896        96
VIS    2025250    183200   21.9700  147.0100       9.6        82       902        92
VIS    2025250    183200   21.9700  146.9900      10.6        80       907        91
VIS    2025250    183200   21.9600  146.9500       9.8        81       907        94
VIS    2025250    183200   21.9700  146.9100       9.7        89       908        95
VIS    2025250    183200   21.9700  146.8900      10.4        89       920        91
VIS    2025250    183200   21.9500  146.8000      10.9        82       981        97
VIS    2025250    183200   21.9600  146.2500      12.9        78       978        99
VIS    2025250    183200   21.9400  146.2200      10.7        82       999        93
VIS    2025250    183200   21.9500  146.0400      14.7        85       915        95
VIS    2025250    183200   21.9400  146.0100      13.3        82       933        99
VIS    2025250    183200   21.9400  145.9900      13.8        82       941        99
VIS    2025250    183200   21.9400  145.9500      15.8        82       969        96
VIS    2025250    183200   21.9500  145.9300      16.5        82       933        91
VIS    2025250    183200   21.9500  145.9000      15.4        82       931        96
VIS    2025250    183200   21.9400  145.8900      14.8        84       923        96
VIS    2025250    183200   21.9400  145.8600      12.1        84       923        99
VIS    2025250    183200   21.9500  145.8500      12.0        85       923        99
VIS    2025250    183200   21.9600  145.8200      12.3        89       921        96
VIS    2025250    183200   21.9300  145.5700      13.6        77       979        92
VIS    2025250    183200   21.9300  145.5500      13.5        81       979        99
VIS    2025250    183200   21.9500  145.5200      14.2        80       988        91
VIS    2025250    183200   21.9400  145.4800      14.6        80       989        97
VIS    2025250    183200   21.9500  145.4500      14.6        78       985        95
VIS    2025250    183200   21.9500  145.4500      14.3        78       985        97
VIS    2025250    183200   21.9300  145.4200      14.9        76       972        93
VIS    2025250    183200   21.9400  145.3900      14.9        79       970        96
VIS    2025250    183200   21.9500  145.3700      15.1        80       971        97
VIS    2025250    183200   21.9500  145.3500      13.4        79       971        97
VIS    2025250    183200   21.9300  145.3000      14.1        75       925        96
VIS    2025250    183200   21.9300  145.3000      14.3        75       925        95
VIS    2025250    183200   21.9300  145.2600      14.7        79       917        93
VIS    2025250    183200   21.9500  145.2300      14.4        81       916        95
VIS    2025250    183200   21.9500  145.2100      14.1        80       918        96
VIS    2025250    183200   21.9500  145.1800      14.6        83       923        97
VIS    2025250    183200   21.9300  145.1600      14.4        82       914        96
VIS    2025250    183200   21.9300  145.1400      13.5        87       911        97
VIS    2025250    183200   21.9500  145.1200      14.3        88       909        95
VIS    2025250    183200   21.9300  144.5400      12.2        89       882        94
VIS    2025250    183200   21.9300  144.5200      13.0        87       904        94
VIS    2025250    183200   21.9400  144.4800      12.6        89       910        93
VIS    2025250    183200   21.9400  144.4700      12.4        90       910        94
VIS    2025250    183200   21.9400  144.4500      11.2        98       887        97
VIS    2025250    183200   21.9400  144.2400      12.4        92       898        95
VIS    2025250    183200   21.9300  144.0500      12.8        94       845        90
VIS    2025250    183200   21.9200  144.0300      13.0        89       884        94
VIS    2025250    183200   21.9300  144.0000      11.9        86       899        95
VIS    2025250    183200   21.9300  144.0000      11.1        88       899        94
VIS    2025250    183200   21.9300  143.9700      12.0        84       907        91
VIS    2025250    183200   21.9400  143.9400      12.7        85       902        90
VIS    2025250    183200   21.9400  143.9100      12.6        86       903        94
VIS    2025250    183200   21.9200  143.8800      11.5        86       914        97
VIS    2025250    183200   21.9200  143.8700      11.1        86       914        96
VIS    2025250    183200   21.9200  143.8000      11.3        82       912        95
VIS    2025250    183200   21.9200  143.8000      11.4        81       912        95
VIS    2025250    183200   21.9200  143.7500      11.0        90       900        99
VIS    2025250    183200   21.9200  143.7300      10.6        91       900        98
VIS    2025250    183200   21.9300  143.7000      11.5        90       888        96
VIS    2025250    183200   21.9300  143.7000      12.0        90       888        95
VIS    2025250    183200   21.9200  143.6100      10.7        81       914        93
VIS    2025250    183200   21.9100  143.5900      10.8        82       906        90
VIS    2025250    183200   21.9200  143.4800      13.4        86       891        92
VIS    2025250    183200   21.9200  143.4800      13.1        86       878        91
VIS    2025250    183200   21.9300  143.3600      12.2        84       908        94
VIS    2025250    183200   21.9200  143.3300      12.4        82       937        96
VIS    2025250    183200   21.9100  143.2900      12.9        82       944        98
VIS    2025250    183200   21.9300  143.2700      11.8        80       925        92
VIS    2025250    183200   21.9100  143.2400      11.6        81       923        92
VIS    2025250    183200   21.9300  143.2200      12.6        85       920        94
VIS    2025250    183200   21.9300  143.1800      13.8        89       917        93
VIS    2025250    183200   21.9300  143.1700      14.3        91       917        91
VIS    2025250    183200   21.9300  143.1300      13.6        90       917        96
VIS    2025250    183200   21.9300  143.1300      13.4        90       917        96
VIS    2025250    183200   21.9300  143.0800      12.5        87       920        98
VIS    2025250    183200   21.9200  143.0600      12.0        86       925        94
VIS    2025250    183200   21.9300  143.0500      12.1        86       925        96
VIS    2025250    183200   21.9200  143.0100      13.2        88       934        95
VIS    2025250    183200   21.9300  142.9900      14.4        88       934        94
VIS    2025250    183200   21.9300  142.9700      14.5        89       934        94
VIS    2025250    183200   21.9200  142.9500      14.6        88       936        94
VIS    2025250    183200   21.9300  142.9300      13.8        88       934        96
VIS    2025250    183200   21.9300  142.9100      12.8        88       944        99
VIS    2025250    183200   21.9300  142.8800      11.8        87       935       100
VIS    2025250    183200   21.9100  142.8500      11.0        90       938        99
VIS    2025250    183200   21.9100  142.8100      11.0        93       936        99
VIS    2025250    183200   21.9100  142.8000      10.9        93       936        98
VIS    2025250    183200   21.9200  142.7800      11.1        94       936        96
VIS    2025250    183200   21.9200  142.7500      11.7        94       934        95
VIS    2025250    183200   21.9200  142.7300      11.9        92       928        96
VIS    2025250    183200   21.9100  142.7100      11.9        90       927        99
VIS    2025250    183200   21.9100  142.6800      12.4        90       927        98
VIS    2025250    183200   21.9100  142.6500      12.7        92       928        97
VIS    2025250    183200   21.9300  142.6200      12.6        91       925        98
VIS    2025250    183200   21.9100  142.5900      12.3        93       926        97
VIS    2025250    183200   21.9200  142.5600      12.4        94       928        98
VIS    2025250    183200   21.9300  142.5400      12.4        93       932        98
VIS    2025250    183200   21.9200  142.5300      11.6        87       933        98
VIS    2025250    183200   21.9100  142.5100      11.2        88       928        96
VIS    2025250    183200   21.9200  142.4700      11.8        91       925        99
VIS    2025250    183200   21.9100  142.4400      11.5        91       925        98
VIS    2025250    183200   21.9100  142.4300      11.5        91       925        98
VIS    2025250    183200   21.9700  149.5700       8.2        82       991        92
VIS    2025250    183200   21.9600  149.5400       8.7        79       966        93
VIS    2025250    183200   21.9700  149.3200       9.0        85       947        90
VIS    2025250    183200   21.9600  149.2700       9.1        88       947        90
VIS    2025250    183200   21.9600  149.2700       9.2        88       943        90
VIS    2025250    183200   21.9600  149.2200       9.9        87       880        94
VIS    2025250    183200   21.9700  149.2100       9.8        89       881        94
VIS    2025250    183200   21.9700  149.1700       9.9        92       883        93
VIS    2025250    183200   21.9500  149.1400       9.9        91       886        93
VIS    2025250    183200   21.9500  149.1300       9.8        90       886        93
VIS    2025250    183200   21.9500  149.1000       9.8        89       885        93
VIS    2025250    183200   21.9600  149.0700       9.8        89       892        95
VIS    2025250    183200   21.9500  149.0400       9.7        88       898        94
VIS    2025250    183200   21.9600  149.0400       9.8        87       905        95
VIS    2025250    183200   21.9500  148.9900      10.2        91       905        94
VIS    2025250    183200   21.9700  148.9700      10.1        87       901        94
VIS    2025250    183200   21.9700  148.9400      10.1        88       901        95
VIS    2025250    183200   21.9500  148.9300       9.8        90       893        94
VIS    2025250    183200   21.9600  148.8900       9.4        85       870        94
VIS    2025250    183200   21.9500  148.8800       9.1        82       867        94
VIS    2025250    183200   21.9500  148.8400       7.9        81       869        96
VIS    2025250    183200   21.9500  148.8100       7.2        83       883        95
VIS    2025250    183200   21.9500  148.8000       7.0        80       893        91
VIS    2025250    183200   21.9500  148.7800       6.7        85       887        96
VIS    2025250    183200   21.9500  148.7500       7.0        85       887        98
VIS    2025250    183200   21.9500  148.7300       7.1        82       903        97
VIS    2025250    183200   21.9500  148.7000       7.6        79       903        97
VIS    2025250    183200   21.9500  148.6800       8.0        81       901        97
VIS    2025250    183200   21.9600  148.6500       8.1        81       898        96
VIS    2025250    183200   21.9600  148.6100       8.5        80       905        96
VIS    2025250    183200   21.9600  148.5800       9.1        82       916        95
VIS    2025250    183200   21.9600  148.5600       9.1        82       929        94
VIS    2025250    183200   21.9500  148.5300       8.5        81       949        90
VIS    2025250    183200   21.9600  148.5300       8.6        82       949        90
VIS    2025250    183200   21.9400  148.4900       7.5        80       956        96
VIS    2025250    183200   21.9500  148.4700       7.5        80       932        96
VIS    2025250    183200   21.9600  148.3700       7.4        83       899        95
VIS    2025250    183200   21.9500  148.3400       7.5        77       899        97
VIS    2025250    183200   21.9400  148.3200       7.7        74       899        96
VIS    2025250    183200   21.9400  148.2800       8.7        79       897        98
VIS    2025250    183200   21.9600  148.2600       9.2        77       897        96
VIS    2025250    183200   21.9400  148.2200       9.6        78       960        98
VIS    2025250    183200   21.9400  148.0200      11.4        80       989        95
VIS    2025250    183200   21.9400  147.9900      10.7        79       969        99
VIS    2025250    183200   21.9300  147.9900      10.6        80       969        99
VIS    2025250    183200   21.9500  147.9200       8.6        86       985        97
VIS    2025250    183200   21.9400  147.9100       7.9        84       985        96
VIS    2025250    183200   21.9500  147.8700       8.7        81       963        95
VIS    2025250    183200   21.9400  147.8600       8.8        80       963        95
VIS    2025250    183200   21.9400  147.7300      11.0        82       988        93
VIS    2025250    183200   21.9300  147.6800       9.4        89       970        90
VIS    2025250    183200   21.9400  147.6600       9.4        86       968        94
VIS    2025250    183200   21.9400  147.6100       8.1        92       902        94
VIS    2025250    183200   21.9300  147.5800       8.2        95       800        94
VIS    2025250    183200   21.9400  147.5600       8.8        99       800        92
VIS    2025250    183200   21.9300  147.5300       9.4        97       782        90
VIS    2025250    183200   21.9300  147.3800      10.7        99       839        90
VIS    2025250    183200   21.9300  147.3700      10.6        98       867        93
VIS    2025250    183200   21.9400  147.3300      10.6        96       878        96
VIS    2025250    183200   21.9400  147.3200      10.8        98       878        95
VIS    2025250    183200   21.9500  147.2800      11.2       104       867        93
VIS    2025250    183200   21.9300  147.2000       8.1        94       872        90
VIS    2025250    183200   21.9300  147.2000       7.9        98       868        93
VIS    2025250    183200   21.9300  147.1600       8.4        98       824        98
VIS    2025250    183200   21.9400  147.1400       9.1        97       801        96
VIS    2025250    183200   21.9400  147.1200       9.2        96       869        97
VIS    2025250    183200   21.9400  147.0800       9.0        97       892        94
VIS    2025250    183200   21.9400  147.0500       8.9        93       896        95
VIS    2025250    183200   21.9300  147.0300       8.6        90       896        92
VIS    2025250    183200   21.9200  146.2300      11.4        79       978        95
VIS    2025250    183200   21.9300  146.2200      11.1        80       978        90
VIS    2025250    183200   21.9200  146.1500      12.9        75       918        91
VIS    2025250    183200   21.9300  146.0800      15.8        86       910        90
VIS    2025250    183200   21.9100  146.0500      14.0        87       910        96
VIS    2025250    183200   21.9300  146.0300      13.5        84       918        98
VIS    2025250    183200   21.9200  146.0000      11.9        83       933       100
VIS    2025250    183200   21.9300  145.9800      13.3        82       941        99
VIS    2025250    183200   21.9300  145.8800      13.6        85       923        97
VIS    2025250    183200   21.9200  145.8700      12.5        85       898        92
VIS    2025250    183200   21.9100  145.5400      13.2        81       968        99
VIS    2025250    183200   21.9200  145.5000      13.3        85       983        98
VIS    2025250    183200   21.9200  145.4900      13.3        85       983        98
VIS    2025250    183200   21.9100  145.4600      14.7        77       954        97
VIS    2025250    183200   21.9100  145.4300      15.7        74       944        90
VIS    2025250    183200   21.9300  145.4000      14.8        77       947        95
VIS    2025250    183200   21.9300  145.4000      14.7        78       947        97
VIS    2025250    183200   21.9200  145.3500      13.7        77       934        97
VIS    2025250    183200   21.9000  145.3200      13.6        82       920        97
VIS    2025250    183200   21.9100  145.3200      13.7        81       920        97
VIS    2025250    183200   21.9100  145.2700      14.4        78       917        95
VIS    2025250    183200   21.9200  145.2600      14.7        78       917        94
VIS    2025250    183200   21.9000  145.2300      14.1        79       917        96
VIS    2025250    183200   21.9000  145.2100      13.6        81       916        98
VIS    2025250    183200   21.9200  145.1500      13.7        85       911        97
VIS    2025250    183200   21.9200  145.1400      13.2        88       909        98
VIS    2025250    183200   21.9100  144.6700      14.0        91       885        92
VIS    2025250    183200   21.9100  144.6500      11.2        90       877        94
VIS    2025250    183200   21.9200  144.5400      12.6        89       884        92
VIS    2025250    183200   21.9200  144.5200      13.0        88       899        92
VIS    2025250    183200   21.9200  144.5000      12.2        85       905        92
VIS    2025250    183200   21.9200  144.4500       9.5       103       840        93
VIS    2025250    183200   21.9000  144.0800      10.6       108       819        96
VIS    2025250    183200   21.9100  144.0500      12.5        95       859        93
VIS    2025250    183200   21.9100  144.0300      13.0        90       870        92
VIS    2025250    183200   21.9100  144.0100      13.1        85       896        93
VIS    2025250    183200   21.9100  144.0000      12.7        84       906        92
VIS    2025250    183200   21.9000  143.9300      12.3        83       911        92
VIS    2025250    183200   21.9000  143.9200      12.4        82       907        94
VIS    2025250    183200   21.9100  143.8800      12.4        85       914        93
VIS    2025250    183200   21.9000  143.8600      11.7        85       917        90
VIS    2025250    183200   21.9000  143.8500      11.6        86       917        94
VIS    2025250    183200   21.9100  143.7400      11.8        87       901        95
VIS    2025250    183200   21.9100  143.7000      11.7        91       900        95
VIS    2025250    183200   21.9100  143.7000      11.8        91       900        94
VIS    2025250    183200   21.8900  143.5500      10.9        83       914        98
VIS    2025250    183200   21.8900  143.5200      12.4        86       906        93
VIS    2025250    183200   21.8900  143.5000      13.4        86       906        93
VIS    2025250    183200   21.8900  143.4500      13.0        85       923        98
VIS    2025250    183200   21.9100  143.4400      13.0        86       922        96
VIS    2025250    183200   21.9000  143.4000      13.2        84       974        98
VIS    2025250    183200   21.9100  143.3600      12.3        84       957        99
VIS    2025250    183200   21.9000  143.3300      12.6        83       957       100
VIS    2025250    183200   21.9100  143.2900      13.0        82       958        99
VIS    2025250    183200   21.8900  143.2600      10.7        89       982        94
VIS    2025250    183200   21.9100  143.2300      11.7        83       923        94
VIS    2025250    183200   21.8900  143.2100      12.5        89       922        97
VIS    2025250    183200   21.8900  143.2000      12.4        90       923        96
VIS    2025250    183200   21.9000  143.1600      12.3        88       920        97
VIS    2025250    183200   21.9100  143.1300      12.7        89       919        96
VIS    2025250    183200   21.8900  143.1100      11.5        91       919        99
VIS    2025250    183200   21.9000  143.0800      12.0        90       919        97
VIS    2025250    183200   21.9000  143.0800      11.9        90       923        97
VIS    2025250    183200   21.9100  143.0500      11.6        89       925        93
VIS    2025250    183200   21.9000  143.0200      12.0        92       925        96
VIS    2025250    183200   21.8900  142.9900      13.4        88       926        97
VIS    2025250    183200   21.8800  142.9600      13.1        87       935        98
VIS    2025250    183200   21.8900  142.9300      13.6        87       943        97
VIS    2025250    183200   21.8900  142.9200      13.1        88       949        97
VIS    2025250    183200   21.9000  142.8800      10.1        91       958        96
VIS    2025250    183200   21.9000  142.8700      10.6        89       944        99
VIS    2025250    183200   21.9000  142.8500      10.9        90       938        99
VIS    2025250    183200   21.8900  142.8200      11.2        93       940        99
VIS    2025250    183200   21.8900  142.7900      11.3        90       940        97
VIS    2025250    183200   21.8900  142.7600      11.4        94       940        95
VIS    2025250    183200   21.8900  142.7500      11.7        95       940        94
VIS    2025250    183200   21.8800  142.7100      11.5        91       932        99
VIS    2025250    183200   21.8800  142.7000      11.4        90       932        99
VIS    2025250    183200   21.9000  142.6500      12.4        91       931        97
VIS    2025250    183200   21.8900  142.6300      12.3        92       931        98
VIS    2025250    183200   21.8800  142.6100      11.4        93       957        99
VIS    2025250    183200   21.8800  142.5800      11.1        94       936        98
VIS    2025250    183200   21.9000  142.5600      11.5        94       932        96
VIS    2025250    183200   21.8900  142.5200      10.5        91       930        93
VIS    2025250    183200   21.9000  142.5100      11.1        89       928        96
VIS    2025250    183200   21.8900  142.4700      11.6        91       926        94
VIS    2025250    183200   21.9000  142.4500      11.5        91       926        93
VIS    2025250    183200   21.8900  142.4200      10.8        92       926        94
VIS    2025250    183200   21.9300  149.5700       8.4        80       984        90
VIS    2025250    183200   21.9300  149.4600       9.4        82       970        90
VIS    2025250    183200   21.9300  149.3700       9.2        79       967        90
VIS    2025250    183200   21.9400  149.3500       9.0        77       962        92
VIS    2025250    183200   21.9300  149.3300       8.9        77       960        93
VIS    2025250    183200   21.9300  149.2900       8.6        84       961        92
VIS    2025250    183200   21.9300  149.2700       8.7        86       914        96
VIS    2025250    183200   21.9500  149.2300       9.7        87       880        93
VIS    2025250    183200   21.9300  149.2100      10.1        89       880        93
VIS    2025250    183200   21.9400  149.2000      10.0        89       882        93
VIS    2025250    183200   21.9300  149.1700       9.9        91       886        94
VIS    2025250    183200   21.9400  149.1500       9.9        91       886        93
VIS    2025250    183200   21.9400  149.1100       9.9        89       890        92
VIS    2025250    183200   21.9400  149.1000       9.8        89       889        92
VIS    2025250    183200   21.9300  149.0500       9.9        89       899        93
VIS    2025250    183200   21.9400  149.0400       9.8        88       899        94
VIS    2025250    183200   21.9400  149.0300       9.8        88       909        96
VIS    2025250    183200   21.9400  148.9900      10.1        91       909        95
VIS    2025250    183200   21.9200  148.9600       9.9        90       900        94
VIS    2025250    183200   21.9400  148.9400       9.8        90       893        94
VIS    2025250    183200   21.9300  148.9200       9.2        86       872        95
VIS    2025250    183200   21.9200  148.8800       8.2        80       867        96
VIS    2025250    183200   21.9400  148.8700       8.4        80       867        95
VIS    2025250    183200   21.9300  148.8500       8.0        81       877        96
VIS    2025250    183200   21.9300  148.8100       7.2        80       893        94
VIS    2025250    183200   21.9400  148.7800       6.7        83       890        94
VIS    2025250    183200   21.9400  148.7700       6.8        84       890        94
VIS    2025250    183200   21.9400  148.7400       6.9        86       895        96
VIS    2025250    183200   21.9300  148.7000       7.0        79       907        96
VIS    2025250    183200   21.9400  148.6900       7.4        79       905        97
VIS    2025250    183200   21.9300  148.6600       7.8        81       909        94
VIS    2025250    183200   21.9300  148.6200       8.5        82       913        98
VIS    2025250    183200   21.9300  148.6100       8.6        83       929        99
VIS    2025250    183200   21.9300  148.5900       8.5        82       953        98
VIS    2025250    183200   21.9400  148.5700       8.4        81       951        93
VIS    2025250    183200   21.9200  148.5200       7.5        79       957        96
VIS    2025250    183200   21.9200  148.4900       7.3        78       934        94
VIS    2025250    183200   21.9200  148.4800       7.2        77       912        90
VIS    2025250    183200   21.9100  148.3700       7.8        77       894        97
VIS    2025250    183200   21.9300  148.3400       7.9        75       899        96
VIS    2025250    183200   21.9300  148.3300       7.9        75       899        96
VIS    2025250    183200   21.9300  148.2900       8.5        80       898        98
VIS    2025250    183200   21.9100  148.2800       9.0        82       904        98
VIS    2025250    183200   21.9200  148.2600       9.0        82       901        98
VIS    2025250    183200   21.9200  148.2300       9.1        81       906        99
VIS    2025250    183200   21.9100  148.2000       9.4        82       960        98
VIS    2025250    183200   21.9300  148.0200      11.3        80       989        97
VIS    2025250    183200   21.9200  148.0000      10.6        80       970        99
VIS    2025250    183200   21.9300  147.9800      10.4        80       969       100
VIS    2025250    183200   21.9100  147.9400       8.1        83       937        93
VIS    2025250    183200   21.9100  147.9200       7.7        81       948        91
VIS    2025250    183200   21.9100  147.9000       7.7        79       953        93
VIS    2025250    183200   21.9200  147.8800       8.1        77       956        93
VIS    2025250    183200   21.9100  147.7600      10.8        87       971        98
VIS    2025250    183200   21.9100  147.7400      10.9        88       990        98
VIS    2025250    183200   21.9100  147.7100       9.8        90       990        95
VIS    2025250    183200   21.9200  147.6500       8.1        90       968        94
VIS    2025250    183200   21.9200  147.6200       7.4        93       902        91
VIS    2025250    183200   21.9200  147.5900       7.5        93       815        91
VIS    2025250    183200   21.9200  147.3900      10.4       103       839        92
VIS    2025250    183200   21.9000  147.3500      10.2        84       907        97
VIS    2025250    183200   21.9100  147.3300      10.5        89       907        97
VIS    2025250    183200   21.9000  147.3100      11.1        98       874        93
VIS    2025250    183200   21.9200  147.2900      11.2       103       878        94
VIS    2025250    183200   21.9000  147.2000       8.7        89       886        97
VIS    2025250    183200   21.9000  147.1900       8.6        89       886        97
VIS    2025250    183200   21.9000  147.1500       9.2        84       895        97
VIS    2025250    183200   21.9000  147.1300       9.5        86       902        97
VIS    2025250    183200   21.9100  147.1100       9.4        88       902        97
VIS    2025250    183200   21.9100  147.0700       9.0        93       905        94
VIS    2025250    183200   21.9100  147.0700       9.1        94       904        94
VIS    2025250    183200   21.9000  146.9900       9.1        98       915        90
VIS    2025250    183200   21.9100  146.9500      10.8        93       948        92
VIS    2025250    183200   21.8900  146.2400      11.8        76       978        92
VIS    2025250    183200   21.9000  146.2100      12.5        79       937        90
VIS    2025250    183200   21.9000  146.2000      13.2        81       926        94
VIS    2025250    183200   21.8900  146.1500      12.9        78       921        91
VIS    2025250    183200   21.9100  146.0900      14.3        83       910        93
VIS    2025250    183200   21.8900  146.0400      10.9        91       849        90
VIS    2025250    183200   21.9000  146.0000      11.3        86       905        96
VIS    2025250    183200   21.9100  146.0000      11.7        85       932        97
VIS    2025250    183200   21.8800  145.5500      14.3        74       947        93
VIS    2025250    183200   21.9000  145.5400      13.2        81       968        99
VIS    2025250    183200   21.8900  145.5200      12.6        86       962        98
VIS    2025250    183200   21.8800  145.4700      14.3        77       938        98
VIS    2025250    183200   21.8800  145.4700      14.5        77       934        97
VIS    2025250    183200   21.8900  145.4400      14.7        75       934        96
VIS    2025250    183200   21.8800  145.4100      14.7        77       933        97
VIS    2025250    183200   21.8900  145.3800      13.7        79       932        98
VIS    2025250    183200   21.8800  145.3600      13.7        81       922        97
VIS    2025250    183200   21.8800  145.3200      14.4        85       918        96
VIS    2025250    183200   21.8900  145.3000      13.9        83       918        96
VIS    2025250    183200   21.8800  145.2800      14.8        78       922        95
VIS    2025250    183200   21.8900  145.2600      14.5        77       922        95
VIS    2025250    183200   21.8800  145.2200      12.9        85       879        92
VIS    2025250    183200   21.8900  144.6500      12.8        89       887        95
VIS    2025250    183200   21.8900  144.6400      12.3        89       885        95
VIS    2025250    183200   21.8800  144.5700      12.1        89       899        93
VIS    2025250    183200   21.8700  144.5600      11.5        90       897        93
VIS    2025250    183200   21.8800  144.5100      10.8        92       872        90
VIS    2025250    183200   21.8900  144.0500      11.4       100       838        93
VIS    2025250    183200   21.8700  144.0000      13.1        85       889        91
VIS    2025250    183200   21.8700  143.9500      11.4        85       900        97
VIS    2025250    183200   21.8700  143.9500      11.5        85       900        97
VIS    2025250    183200   21.8900  143.9200      12.6        83       907        96
VIS    2025250    183200   21.8700  143.8900      12.6        85       907        97
VIS    2025250    183200   21.8600  143.7300      13.5        80       910        92
VIS    2025250    183200   21.8600  143.6900      12.1        86       909        94
VIS    2025250    183200   21.8700  143.6700      12.5        85       908        94
VIS    2025250    183200   21.8700  143.6400      12.1        85       906        91
VIS    2025250    183200   21.8800  143.5500      11.2        83       912        97
VIS    2025250    183200   21.8700  143.5100      12.8        86       906        96
VIS    2025250    183200   21.8800  143.4900      13.5        85       910        95
VIS    2025250    183200   21.8800  143.4500      13.1        85       923        98
VIS    2025250    183200   21.8800  143.4500      13.0        84       927        98
VIS    2025250    183200   21.8700  143.4000      13.4        86       997        98
VIS    2025250    183200   21.8700  143.4000      13.5        86       997        97
VIS    2025250    183200   21.8800  143.3300      12.8        83       999        98
VIS    2025250    183200   21.8700  143.3200      12.7        84       999        97
VIS    2025250    183200   21.8800  143.3000      12.0        86       999        97
VIS    2025250    183200   21.8800  143.2400      11.0        90       925        96
VIS    2025250    183200   21.8800  143.2100      12.6        89       923        96
VIS    2025250    183200   21.8800  143.2000      12.5        90       923        96
VIS    2025250    183200   21.8700  143.1600      11.6        88       923        97
VIS    2025250    183200   21.8800  143.1400      11.2        87       922        99
VIS    2025250    183200   21.8600  143.1200      11.0        89       922        97
VIS    2025250    183200   21.8700  143.0900      11.7        92       922        98
VIS    2025250    183200   21.8700  143.0600      11.3        93       924        98
VIS    2025250    183200   21.8600  143.0500      11.0        94       924        96
VIS    2025250    183200   21.8800  143.0200      11.4        93       925        94
VIS    2025250    183200   21.8700  143.0000      12.3        91       926        96
VIS    2025250    183200   21.8800  142.9600      12.8        87       933        98
VIS    2025250    183200   21.8700  142.9400      12.6        87       936        98
VIS    2025250    183200   21.8600  142.9200      11.8        90       951        94
VIS    2025250    183200   21.8800  142.8900       8.8        89       960        94
VIS    2025250    183200   21.8800  142.8600       9.2        88       947        94
VIS    2025250    183200   21.8700  142.8300      10.5        89       946        97
VIS    2025250    183200   21.8600  142.8100      11.5        88       945        96
VIS    2025250    183200   21.8600  142.8000      11.4        88       945        95
VIS    2025250    183200   21.8600  142.7700      11.1        89       944        93
VIS    2025250    183200   21.8600  142.7300      11.5        93       942        95
VIS    2025250    183200   21.8800  142.7100      11.4        91       933        99
VIS    2025250    183200   21.8800  142.7000      11.3        90       934        99
VIS    2025250    183200   21.8700  142.6700      11.3        88       945        97
VIS    2025250    183200   21.8800  142.6400      11.9        91       957        98
VIS    2025250    183200   21.8800  142.6200      11.7        92       957        99
VIS    2025250    183200   21.8700  142.5800      11.0        95       959        96
VIS    2025250    183200   21.8800  142.5800      11.0        94       952        98
VIS    2025250    183200   21.8600  142.5500      11.0        96       952        97
VIS    2025250    183200   21.8800  142.5200       9.9        92       930        91
VIS    2025250    183200   21.8600  142.5000       9.4        93       930        91
VIS    2025250    183200   21.8800  142.4800      11.1        91       927        94
VIS    2025250    183200   21.8800  142.4400      10.6        92       927        96
VIS    2025250    183200   21.8700  142.4300      10.3        92       927        97
VIS    2025250    183200   21.9100  149.6400       8.3        74       997        94
VIS    2025250    183200   21.9100  149.6200       8.3        81       997        92
VIS    2025250    183200   21.9100  149.6000       8.5        78       987        92
VIS    2025250    183200   21.9300  149.5700       8.4        79       984        91
VIS    2025250    183200   21.9200  149.4500       9.6        81       970        90
VIS    2025250    183200   21.9200  149.3600       9.0        77       962        91
VIS    2025250    183200   21.9200  149.3500       8.9        74       962        91
VIS    2025250    183200   21.9200  149.3200       8.7        75       960        93
VIS    2025250    183200   21.9100  149.2800       8.4        83       943        94
VIS    2025250    183200   21.9100  149.2800       8.4        83       914        97
VIS    2025250    183200   21.9100  149.2400       9.2        88       880        95
VIS    2025250    183200   21.9100  149.2100      10.1        90       885        93
VIS    2025250    183200   21.9100  149.2000      10.0        90       885        93
VIS    2025250    183200   21.9100  149.1600       9.9        92       896        94
VIS    2025250    183200   21.9100  149.1400      10.0        92       896        94
VIS    2025250    183200   21.9000  149.1200      10.3        92       904        94
VIS    2025250    183200   21.9100  149.0900      10.4        91       912        94
VIS    2025250    183200   21.9100  149.0600      10.2        88       900        94
VIS    2025250    183200   21.9000  149.0500      10.4        87       903        94
VIS    2025250    183200   21.9100  149.0000      10.5        91       902        93
VIS    2025250    183200   21.9000  148.9900      10.5        92       899        93
VIS    2025250    183200   21.9000  148.9600       9.9        89       892        94
VIS    2025250    183200   21.9100  148.9400       9.3        87       885        95
VIS    2025250    183200   21.9100  148.9000       8.3        83       866        96
VIS    2025250    183200   21.9200  148.8800       8.0        81       867        97
VIS    2025250    183200   21.9100  148.8600       7.6        80       874        97
VIS    2025250    183200   21.9000  148.8400       7.3        81       887        95
VIS    2025250    183200   21.8900  148.7900       6.2        78       898        94
VIS    2025250    183200   21.9000  148.7600       7.3        84       890        99
VIS    2025250    183200   21.9100  148.7400       7.2        85       895        99
VIS    2025250    183200   21.9000  148.7000       6.5        76       903        93
VIS    2025250    183200   21.9100  148.6900       6.9        78       907        95
VIS    2025250    183200   21.9100  148.6700       7.9        80       909        94
VIS    2025250    183200   21.9100  148.6200       8.4        82       917        98
VIS    2025250    183200   21.9000  148.5900       8.1        81       943        97
VIS    2025250    183200   21.9000  148.5900       8.1        80       943        97
VIS    2025250    183200   21.9000  148.5600       7.6        80       963        95
VIS    2025250    183200   21.8900  148.5200       7.7        80       909        96
VIS    2025250    183200   21.8900  148.5100       7.7        80       912        95
VIS    2025250    183200   21.9000  148.4700       7.2        77       907        90
VIS    2025250    183200   21.8900  148.3900       7.3        74       897        93
VIS    2025250    183200   21.9100  148.3700       7.9        77       897        97
VIS    2025250    183200   21.9100  148.3600       7.9        77       897        97
VIS    2025250    183200   21.9000  148.3400       8.3        78       901        95
VIS    2025250    183200   21.9000  148.2900       8.9        82       911        93
VIS    2025250    183200   21.9100  148.2700       9.0        82       906        97
VIS    2025250    183200   21.9000  148.2400       8.6        84       918        99
VIS    2025250    183200   21.9100  148.2300       8.9        82       906        99
VIS    2025250    183200   21.8900  148.1900       9.4        83       977        99
VIS    2025250    183200   21.8900  148.0400      11.4        84       989        96
VIS    2025250    183200   21.8900  148.0200      10.7        81       989        97
VIS    2025250    183200   21.9000  148.0000      10.2        80       969        98
VIS    2025250    183200   21.8800  147.9600       8.8        81       944        95
VIS    2025250    183200   21.9000  147.9500       8.2        83       937        93
VIS    2025250    183200   21.9000  147.8900       7.7        79       948        93
VIS    2025250    183200   21.9000  147.7600      11.1        90       975        97
VIS    2025250    183200   21.9000  147.7400      11.0        91       990        97
VIS    2025250    183200   21.8800  147.7200       9.7        92       949        95
VIS    2025250    183200   21.8800  147.4100       9.6        99       866        94
VIS    2025250    183200   21.8800  147.3900      10.3        92       882        94
VIS    2025250    183200   21.9000  147.3500      10.2        83       907        95
VIS    2025250    183200   21.8900  147.3500      10.4        84       907        95
VIS    2025250    183200   21.9000  147.3100      11.2        96       874        92
VIS    2025250    183200   21.8700  147.2500      10.1        95       771        90
VIS    2025250    183200   21.8800  147.2300       9.6        90       857        91
VIS    2025250    183200   21.8800  147.2200       9.1        86       881        93
VIS    2025250    183200   21.8700  147.1800       8.9        82       892        97
VIS    2025250    183200   21.8900  147.1500       9.2        84       895        97
VIS    2025250    183200   21.8900  147.1400       9.4        84       902        97
VIS    2025250    183200   21.8900  146.9800       9.2        97       926        91
VIS    2025250    183200   21.8800  146.9600      10.5        90       933        95
VIS    2025250    183200   21.8700  146.1400      11.9        78       913        90
VIS    2025250    183200   21.8600  146.1000      10.1        82       905        92
VIS    2025250    183200   21.8700  145.5300      12.7        82       952        95
VIS    2025250    183200   21.8800  145.5200      12.5        84       952        97
VIS    2025250    183200   21.8600  145.4800      14.7        79       927        97
VIS    2025250    183200   21.8800  145.4700      14.7        77       934        97
VIS    2025250    183200   21.8600  145.4300      14.5        78       932        97
VIS    2025250    183200   21.8700  145.4200      14.9        77       932        96
VIS    2025250    183200   21.8600  145.3800      13.4        79       927        99
VIS    2025250    183200   21.8500  145.3700      13.8        80       918        97
VIS    2025250    183200   21.8700  145.3300      14.7        83       918        95
VIS    2025250    183200   21.8700  145.3200      14.8        84       918        95
VIS    2025250    183200   21.8700  145.2900      15.2        78       927        94
VIS    2025250    183200   21.8600  145.2600      14.4        78       924        95
VIS    2025250    183200   21.8700  145.2300      13.0        84       879        92
VIS    2025250    183200   21.8700  145.2200      12.7        86       879        92
VIS    2025250    183200   21.8500  144.6900      14.6        95       864        90
VIS    2025250    183200   21.8500  144.6000      14.8        88       885        90
VIS    2025250    183200   21.8600  144.5900      14.5        88       889        91
VIS    2025250    183200   21.8600  144.5500      10.9        89       897        97
VIS    2025250    183200   21.8600  144.5500      10.7        89       897        95
VIS    2025250    183200   21.8500  144.5200      10.4        93       884        94
VIS    2025250    183200   21.8600  144.4900       9.5        93       859        93
VIS    2025250    183200   21.8600  144.0300       9.8        98       838        95
VIS    2025250    183200   21.8500  143.9800      12.3        92       876        94
VIS    2025250    183200   21.8500  143.9700      11.9        91       889        97
VIS    2025250    183200   21.8500  143.9300      12.0        87       879        91
VIS    2025250    183200   21.8500  143.9100      13.2        85       879        90
VIS    2025250    183200   21.8400  143.8800      12.5        82       881        90
VIS    2025250    183200   21.8500  143.8600      12.0        82       906        90
VIS    2025250    183200   21.8500  143.8300      12.9        81       911        92
VIS    2025250    183200   21.8600  143.8200      13.0        81       916        90
VIS    2025250    183200   21.8400  143.7300      13.4        86       919        96
VIS    2025250    183200   21.8400  143.7100      12.5        86       913        94
VIS    2025250    183200   21.8400  143.6800      12.3        84       912        97
VIS    2025250    183200   21.8400  143.6800      12.4        84       912        97
VIS    2025250    183200   21.8500  143.6500      12.6        84       908        96
VIS    2025250    183200   21.8400  143.6200      12.7        83       911        95
VIS    2025250    183200   21.8400  143.5600      12.1        87       912        99
VIS    2025250    183200   21.8400  143.5500      12.0        87       914        99
VIS    2025250    183200   21.8500  143.5100      12.2        85       906        97
VIS    2025250    183200   21.8600  143.4800      12.8        85       917        97
VIS    2025250    183200   21.8500  143.4600      12.6        85       951        99
VIS    2025250    183200   21.8600  143.3100      12.0        86       999        94
VIS    2025250    183200   21.8400  143.2800      10.8       100       986        95
VIS    2025250    183200   21.8500  143.2400      11.2        94       930        92
VIS    2025250    183200   21.8400  143.2300      11.8        88       924        98
VIS    2025250    183200   21.8400  143.1800      12.8        88       925        98
VIS    2025250    183200   21.8500  143.1600      12.0        88       925        97
VIS    2025250    183200   21.8400  143.1500      11.8        89       933        96
VIS    2025250    183200   21.8500  143.1300      11.0        89       926        96
VIS    2025250    183200   21.8400  143.0800      12.2        92       926        94
VIS    2025250    183200   21.8500  143.0800      12.0        92       924        96
VIS    2025250    183200   21.8500  143.0500      11.5        94       926        98
VIS    2025250    183200   21.8300  143.0100      11.8        92       927        99
VIS    2025250    183200   21.8300  143.0000      11.9        92       927        99
VIS    2025250    183200   21.8300  142.9800      12.2        93       935        99
VIS    2025250    183200   21.8300  142.9600      11.8        93       942        99
VIS    2025250    183200   21.8500  142.9300      11.8        92       949        94
VIS    2025250    183200   21.8300  142.8900      12.2        92       953        94
VIS    2025250    183200   21.8400  142.8600      10.4        88       948        99
VIS    2025250    183200   21.8400  142.8400      10.4        86       946        98
VIS    2025250    183200   21.8500  142.8100      11.5        86       945        93
VIS    2025250    183200   21.8500  142.8100      11.4        86       945        93
VIS    2025250    183200   21.8400  142.7400      10.8        91       933        93
VIS    2025250    183200   21.8500  142.7300      11.4        92       942        95
VIS    2025250    183200   21.8500  142.6900      11.0        87       947        95
VIS    2025250    183200   21.8500  142.6600      11.2        89       952        94
VIS    2025250    183200   21.8500  142.6500      11.5        90       957        94
VIS    2025250    183200   21.8500  142.6300      11.6        90       971        94
VIS    2025250    183200   21.8500  142.5600      11.2        97       959        96
VIS    2025250    183200   21.8500  142.5500      11.2        96       952        97
VIS    2025250    183200   21.8300  142.5300      10.9        95       934        96
VIS    2025250    183200   21.8400  142.5100       9.5        94       933        96
VIS    2025250    183200   21.8300  142.4600       8.9        96       933        96
VIS    2025250    183200   21.8500  142.4400       9.5        93       933        98
VIS    2025250    183200   21.8300  142.4100       8.9        97       933        96
VIS    2025250    183200   21.8300  142.4100       8.6       102       933        93
VIS    2025250    183200   21.8900  149.6600       7.1        65       978        98
VIS    2025250    183200   21.8900  149.6400       8.2        75       978        95
VIS    2025250    183200   21.8800  149.6100       8.5        80       977        93
VIS    2025250    183200   21.8800  149.6000       8.8        78       968        92
VIS    2025250    183200   21.8800  149.3300       8.1        77       983        90
VIS    2025250    183200   21.8900  149.3100       8.1        76       963        94
VIS    2025250    183200   21.9000  149.2900       8.4        79       924        97
VIS    2025250    183200   21.8700  149.2500       9.1        90       880        99
VIS    2025250    183200   21.8700  149.2300       9.2        91       881        96
VIS    2025250    183200   21.8800  149.2100       9.4        91       882        95
VIS    2025250    183200   21.8800  149.1800       9.7        90       897        95
VIS    2025250    183200   21.8900  149.1700       9.8        92       897        94
VIS    2025250    183200   21.8900  149.1300      10.0        92       908        95
VIS    2025250    183200   21.8800  149.1100      10.2        90       908        95
VIS    2025250    183200   21.8700  149.0700      10.4        89       902        93
VIS    2025250    183200   21.8800  149.0500      10.5        89       903        94
VIS    2025250    183200   21.8800  149.0200      10.6        90       900        93
VIS    2025250    183200   21.8800  149.0000      10.7        92       899        92
VIS    2025250    183200   21.8800  148.9700      10.4        91       893        93
VIS    2025250    183200   21.8800  148.9500       9.5        88       885        95
VIS    2025250    183200   21.8800  148.9300       8.8        83       881        96
VIS    2025250    183200   21.8700  148.9000       7.0        80       874        93
VIS    2025250    183200   21.8800  148.8800       6.9        81       874        94
VIS    2025250    183200   21.8900  148.8500       6.7        81       887        97
VIS    2025250    183200   21.8800  148.8300       6.1        77       893        93
VIS    2025250    183200   21.8900  148.7900       6.0        77       898        95
VIS    2025250    183200   21.8700  148.7800       6.6        77       898        97
VIS    2025250    183200   21.8900  148.7600       7.4        82       895        99
VIS    2025250    183200   21.8900  148.7200       7.0        80       921        96
VIS    2025250    183200   21.8800  148.6900       7.4        78       893        97
VIS    2025250    183200   21.8700  148.6800       8.1        80       893        98
VIS    2025250    183200   21.8700  148.6600       8.3        82       899        99
VIS    2025250    183200   21.8700  148.6300       8.0        82       915        98
VIS    2025250    183200   21.8800  148.6000       7.8        80       917        94
VIS    2025250    183200   21.8800  148.5800       7.9        80       921        94
VIS    2025250    183200   21.8800  148.5500       7.9        79       912        94
VIS    2025250    183200   21.8800  148.5300       7.9        79       909        96
VIS    2025250    183200   21.8600  148.4900       8.2        80       902        94
VIS    2025250    183200   21.8800  148.3900       7.5        76       897        90
VIS    2025250    183200   21.8800  148.3600       8.3        82       899        95
VIS    2025250    183200   21.8700  148.3500       8.4        83       899        96
VIS    2025250    183200   21.8800  148.3200       8.5        79       904        91
VIS    2025250    183200   21.8600  148.2800       9.0        81       932        99
VIS    2025250    183200   21.8800  148.2700       8.8        84       925        97
VIS    2025250    183200   21.8600  148.2500       9.0        84       932       100
VIS    2025250    183200   21.8600  148.2100       9.1        81       917       100
VIS    2025250    183200   21.8800  148.2000       9.1        82       929        99
VIS    2025250    183200   21.8600  147.9700       9.2        80       944        93
VIS    2025250    183200   21.8800  147.9600       8.9        81       944        94
VIS    2025250    183200   21.8600  147.8100       8.8        83       972        96
VIS    2025250    183200   21.8600  147.7800       9.9        87       960        96
VIS    2025250    183200   21.8600  147.7400      10.3        93       945        95
VIS    2025250    183200   21.8700  147.7300       9.9        92       949        95
VIS    2025250    183200   21.8700  147.6900       8.2        90       931        90
VIS    2025250    183200   21.8700  147.6800       7.8        91       935        91
VIS    2025250    183200   21.8700  147.6400       7.2        99       830        92
VIS    2025250    183200   21.8600  147.5100       5.9        91       784        95
VIS    2025250    183200   21.8500  147.4400       9.0       102       807        92
VIS    2025250    183200   21.8600  147.4200       9.5        94       862        93
VIS    2025250    183200   21.8700  147.4100       9.7        96       872        94
VIS    2025250    183200   21.8500  147.3700       9.8        90       942        93
VIS    2025250    183200   21.8500  147.3400       9.9        93       863        94
VIS    2025250    183200   21.8600  147.2100       9.0        81       881        94
VIS    2025250    183200   21.8700  147.2000       8.9        81       884        95
VIS    2025250    183200   21.8700  147.0200       8.3        96       899        90
VIS    2025250    183200   21.8600  146.9900       8.3        94       904        90
VIS    2025250    183200   21.8400  145.6100      13.4        75       909        90
VIS    2025250    183200   21.8300  145.5400      14.7        72       933        90
VIS    2025250    183200   21.8500  145.5400      14.2        73       933        92
VIS    2025250    183200   21.8300  145.4900      14.4        81       924        96
VIS    2025250    183200   21.8300  145.4800      14.7        81       924        96
VIS    2025250    183200   21.8300  145.4400      14.8        81       925        96
VIS    2025250    183200   21.8500  145.4200      14.4        79       932        97
VIS    2025250    183200   21.8300  145.3900      14.1        81       920        96
VIS    2025250    183200   21.8500  145.3700      13.9        80       918        97
VIS    2025250    183200   21.8300  145.3500      14.0        83       915        96
VIS    2025250    183200   21.8500  145.3300      14.7        81       917        95
VIS    2025250    183200   21.8300  145.3000      15.2        79       917        93
VIS    2025250    183200   21.8500  145.2900      15.5        76       929        90
VIS    2025250    183200   21.8300  144.6000      13.2        88       889        94
VIS    2025250    183200   21.8300  144.5700      11.7        87       890        96
VIS    2025250    183200   21.8300  144.5500      11.1        87       890        97
VIS    2025250    183200   21.8400  144.5300      10.7        89       885        95
VIS    2025250    183200   21.8400  144.5000      10.2        92       867        96
VIS    2025250    183200   21.8300  144.4800      10.7        91       867        94
VIS    2025250    183200   21.8400  144.4600      10.5        92       859        91
VIS    2025250    183200   21.8100  143.8500      12.7        83       890        91
VIS    2025250    183200   21.8200  143.7800      11.6        85       917        92
VIS    2025250    183200   21.8200  143.7600      13.7        86       918        95
VIS    2025250    183200   21.8100  143.7200      12.9        89       931        98
VIS    2025250    183200   21.8100  143.7100      12.5        89       931        98
VIS    2025250    183200   21.8300  143.6700      12.6        84       913        96
VIS    2025250    183200   21.8200  143.6600      13.0        84       929        98
VIS    2025250    183200   21.8200  143.6300      13.0        84       929        99
VIS    2025250    183200   21.8100  143.5900      11.9        87       923        98
VIS    2025250    183200   21.8200  143.5700      11.6        89       923        98
VIS    2025250    183200   21.8200  143.5400      11.7        87       916        99
VIS    2025250    183200   21.8300  143.5300      12.1        87       916        99
VIS    2025250    183200   21.8300  143.5100      12.4        87       936        98
VIS    2025250    183200   21.8200  143.4900      12.3        89       951        98
VIS    2025250    183200   21.8200  143.3000      11.7        96       986        94
VIS    2025250    183200   21.8300  143.2800      11.3        96       986        96
VIS    2025250    183200   21.8200  143.2500      11.6        90       934        99
VIS    2025250    183200   21.8200  143.2300      11.9        89       926        98
VIS    2025250    183200   21.8100  143.2000      12.5        89       934        94
VIS    2025250    183200   21.8200  143.1800      13.1        89       934        96
VIS    2025250    183200   21.8100  143.1600      12.9        90       942        95
VIS    2025250    183200   21.8100  143.1200      12.5        92       942        94
VIS    2025250    183200   21.8100  143.1000      12.5        93       956        95
VIS    2025250    183200   21.8100  143.0900      12.5        93       937        95
VIS    2025250    183200   21.8100  143.0500      12.0        93       936        98
VIS    2025250    183200   21.8100  143.0300      12.1        91       935        99
VIS    2025250    183200   21.8300  143.0000      12.0        92       933        99
VIS    2025250    183200   21.8200  142.9800      12.3        92       937        99
VIS    2025250    183200   21.8100  142.9600      12.3        90       944        98
VIS    2025250    183200   21.8100  142.9300      11.3        90       944        96
VIS    2025250    183200   21.8200  142.9000      11.6        93       945        94
VIS    2025250    183200   21.8300  142.9000      12.3        93       949        95
VIS    2025250    183200   21.8200  142.8600      11.2        94       944        98
VIS    2025250    183200   21.8100  142.8400      10.9        97       944        97
VIS    2025250    183200   21.8100  142.8100      11.5        90       944        98
VIS    2025250    183200   21.8200  142.7900      11.9        89       945        93
VIS    2025250    183200   21.8300  142.7300      10.2        90       933        95
VIS    2025250    183200   21.8300  142.7000      10.5        86       942        98
VIS    2025250    183200   21.8100  142.7000      12.3        90       935        95
VIS    2025250    183200   21.8100  142.6600      12.5        96       948        93
VIS    2025250    183200   21.8300  142.6400      11.7        92       962        95
VIS    2025250    183200   21.8200  142.5500      11.6        98       957        94
VIS    2025250    183200   21.8200  142.5300      11.0        96       942        95
VIS    2025250    183200   21.8300  142.5200      10.6        95       934        96
VIS    2025250    183200   21.8100  142.4800       9.1        96       933        95
VIS    2025250    183200   21.8300  142.4600       8.9        97       933        96
VIS    2025250    183200   21.8000  142.4400       9.5       102       934        95
VIS    2025250    183200   21.8600  149.7500       8.2        76       980        93
VIS    2025250    183200   21.8600  149.7300       8.5        75       980        92
VIS    2025250    183200   21.8600  149.6800       7.9        77       980        95
VIS    2025250    183200   21.8600  149.6600       7.7        72       978        97
VIS    2025250    183200   21.8600  149.6400       8.3        74       949        96
VIS    2025250    183200   21.8600  149.6100       8.8        79       971        91
VIS    2025250    183200   21.8600  149.3700       8.0        77       997        92
VIS    2025250    183200   21.8500  149.3500       8.3        82       983        92
VIS    2025250    183200   21.8600  149.3300       8.3        84       932        94
VIS    2025250    183200   21.8700  149.3200       8.1        82       963        91
VIS    2025250    183200   21.8700  149.2900       8.6        85       891        97
VIS    2025250    183200   21.8500  149.2600       9.3        91       882        99
VIS    2025250    183200   21.8500  149.2400       9.3        93       882        95
VIS    2025250    183200   21.8500  149.2100       9.2        92       888        96
VIS    2025250    183200   21.8600  149.1900       9.4        90       897        96
VIS    2025250    183200   21.8600  149.1500       9.6        88       945        98
VIS    2025250    183200   21.8500  149.1200       9.2        88       945        99
VIS    2025250    183200   21.8600  149.1100       9.3        88       927        98
VIS    2025250    183200   21.8500  149.0700      10.4        89       899        92
VIS    2025250    183200   21.8700  149.0500      10.5        89       902        93
VIS    2025250    183200   21.8600  149.0400      10.6        89       902        93
VIS    2025250    183200   21.8500  148.9900      10.4        89       902        93
VIS    2025250    183200   21.8500  148.9600       9.8        87       881        94
VIS    2025250    183200   21.8500  148.9600       9.7        88       881        94
VIS    2025250    183200   21.8600  148.9200       7.9        80       866        95
VIS    2025250    183200   21.8600  148.9000       7.1        78       874        92
VIS    2025250    183200   21.8400  148.8700       5.9        81       907        91
VIS    2025250    183200   21.8500  148.8600       5.9        82       903        91
VIS    2025250    183200   21.8600  148.8100       6.2        76       893        94
VIS    2025250    183200   21.8600  148.7900       6.4        74       896        95
VIS    2025250    183200   21.8400  148.7600       7.2        76       896        96
VIS    2025250    183200   21.8600  148.7400       7.8        80       921        97
VIS    2025250    183200   21.8400  148.7200       7.8        80       899        97
VIS    2025250    183200   21.8400  148.6800       8.3        83       887        99
VIS    2025250    183200   21.8400  148.6600       8.3        83       895        99
VIS    2025250    183200   21.8500  148.6500       8.1        82       899        98
VIS    2025250    183200   21.8600  148.6200       7.9        81       912        96
VIS    2025250    183200   21.8500  148.5900       7.8        80       904        93
VIS    2025250    183200   21.8400  148.5600       8.0        79       903        93
VIS    2025250    183200   21.8600  148.5500       7.9        77       910        91
VIS    2025250    183200   21.8400  148.5100       8.2        80       901        97
VIS    2025250    183200   21.8500  148.5000       8.4        80       901        95
VIS    2025250    183200   21.8600  148.4600       7.8        77       900        90
VIS    2025250    183200   21.8500  148.3600       8.7        84       899        95
VIS    2025250    183200   21.8600  148.3500       8.6        85       899        95
VIS    2025250    183200   21.8500  148.3200       8.4        83       908        97
VIS    2025250    183200   21.8600  148.2900       8.9        80       930        99
VIS    2025250    183200   21.8400  148.2600       9.6        81       940        99
VIS    2025250    183200   21.8400  148.2300       9.1        80       917        98
VIS    2025250    183200   21.8400  148.2200       9.1        80       917        97
VIS    2025250    183200   21.8500  148.1900       9.1        81       888        96
VIS    2025250    183200   21.8300  148.1600       9.0        82       926        98
VIS    2025250    183200   21.8400  148.1500       9.0        84       955        96
VIS    2025250    183200   21.8500  147.9700       9.3        79       944        94
VIS    2025250    183200   21.8300  147.9500       9.0        79       925        95
VIS    2025250    183200   21.8400  147.9200       8.2        81       871        90
VIS    2025250    183200   21.8500  147.8900       8.1        83       870        92
VIS    2025250    183200   21.8300  147.8100       8.6        84       960        94
VIS    2025250    183200   21.8400  147.8100       8.7        84       960        96
VIS    2025250    183200   21.8500  147.7800       9.8        88       960        96
VIS    2025250    183200   21.8400  147.7400       9.6        92       898        94
VIS    2025250    183200   21.8300  147.7200       9.2        98       897        91
VIS    2025250    183200   21.8500  147.7100       8.8        91       921        90
VIS    2025250    183200   21.8400  147.6700       7.9       101       830        98
VIS    2025250    183200   21.8500  147.6600       8.0        98       821        91
VIS    2025250    183200   21.8500  147.4600       8.6       109       782        95
VIS    2025250    183200   21.8400  147.4400       8.8        99       807        92
VIS    2025250    183200   21.8400  147.4200       9.5        91       880        95
VIS    2025250    183200   21.8400  147.4000       9.8        91       940        92
VIS    2025250    183200   21.8200  147.3700       9.2        90       890        97
VIS    2025250    183200   21.8300  147.3500       9.2        94       863        96
VIS    2025250    183200   21.8300  147.1900       8.1        81       907        90
VIS    2025250    183200   21.8400  147.1800       8.4        82       907        92
VIS    2025250    183200   21.8400  147.0200       7.1        96       901        90
VIS    2025250    183200   21.8100  145.6200      13.1        79       909        94
VIS    2025250    183200   21.8200  145.5300      15.0        72       931        92
VIS    2025250    183200   21.8200  145.4900      14.5        81       924        96
VIS    2025250    183200   21.8200  145.4700      14.7        82       924        97
VIS    2025250    183200   21.8000  145.4600      14.4        83       929        97
VIS    2025250    183200   21.8200  145.4200      14.4        83       924        97
VIS    2025250    183200   21.8000  145.3900      14.3        83       917        94
VIS    2025250    183200   21.8100  145.3600      13.7        84       913        90
VIS    2025250    183200   21.8200  145.3500      14.0        84       913        96
VIS    2025250    183200   21.8100  145.3200      13.1        89       913        98
VIS    2025250    183200   21.8200  145.3000      14.1        83       915        95
VIS    2025250    183200   21.8000  144.5700      11.5       107       880        97
VIS    2025250    183200   21.8200  144.5500      11.3        93       890        99
VIS    2025250    183200   21.8100  144.5200      12.1        89       880        95
VIS    2025250    183200   21.8000  144.5100      12.1        89       874        93
VIS    2025250    183200   21.8100  143.7700      12.2        85       918        94
VIS    2025250    183200   21.8100  143.7500      13.8        87       931        94
VIS    2025250    183200   21.7900  143.7200      12.3        89       962        99
VIS    2025250    183200   21.8100  143.6800      12.7        86       929        98
VIS    2025250    183200   21.7900  143.6300      12.6        84       964        92
VIS    2025250    183200   21.7900  143.6100      12.0        86       964        91
VIS    2025250    183200   21.8100  143.5600      10.9        88       932        97
VIS    2025250    183200   21.8100  143.5200      11.6        84       964        98
VIS    2025250    183200   21.8000  143.5100      12.0        84       964        98
VIS    2025250    183200   21.8000  143.4200      14.9        91       992        95
VIS    2025250    183200   21.7900  143.4100      13.9        92       992        95
VIS    2025250    183200   21.8100  143.2800      11.8        93       973        95
VIS    2025250    183200   21.7900  143.2500      11.3        90       943        95
VIS    2025250    183200   21.7900  143.2300      11.0        90       941        93
VIS    2025250    183200   21.7900  143.2100      11.1        90       938        93
VIS    2025250    183200   21.8000  143.1800      12.0        91       944        98
VIS    2025250    183200   21.8000  143.1500      12.7        91       944        97
VIS    2025250    183200   21.8000  143.1400      12.6        92       949        96
VIS    2025250    183200   21.8000  143.1100      12.6        93       956        95
VIS    2025250    183200   21.7900  143.0700      12.2        91       956        97
VIS    2025250    183200   21.7900  143.0700      12.2        91       949        97
VIS    2025250    183200   21.8000  143.0300      12.0        91       939        99
VIS    2025250    183200   21.7900  143.0000      12.0        91       944        98
VIS    2025250    183200   21.7800  142.9900      11.9        91       945        98
VIS    2025250    183200   21.7900  142.9500      11.4        92       944        93
VIS    2025250    183200   21.8000  142.9400      11.4        89       944        96
VIS    2025250    183200   21.8000  142.9100      10.9        90       940        95
VIS    2025250    183200   21.7900  142.8800      11.4        90       939        97
VIS    2025250    183200   21.8000  142.8600      11.1        94       940        96
VIS    2025250    183200   21.8000  142.8400      11.0        97       943        94
VIS    2025250    183200   21.8000  142.8000      11.8        93       943        97
VIS    2025250    183200   21.7900  142.7800      12.2        90       943        99
VIS    2025250    183200   21.7800  142.7500      10.8        90       937        99
VIS    2025250    183200   21.7900  142.6900      13.1        96       945        92
VIS    2025250    183200   21.7900  142.6700      12.8        98       947        93
VIS    2025250    183200   21.7900  142.6500      11.8        97       953        94
VIS    2025250    183200   21.7800  142.6100      10.4        93       959        92
VIS    2025250    183200   21.8000  142.5900       9.4       101       963        91
VIS    2025250    183200   21.7900  142.5100       9.8        98       933        92
VIS    2025250    183200   21.7900  142.4800       9.2        97       934        94
VIS    2025250    183200   21.7900  142.4700       9.2        96       934        94
VIS    2025250    183200   21.8000  142.4400       9.6       102       934        94
VIS    2025250    183200   21.7900  142.4100       8.7       118       934        90
VIS    2025250    183200   21.8500  149.7400       8.2        77       980        93
VIS    2025250    183200   21.8500  149.7000       8.6        76       980        92
VIS    2025250    183200   21.8400  149.6900       8.4        77       936        96
VIS    2025250    183200   21.8400  149.6600       8.0        76       944        97
VIS    2025250    183200   21.8400  149.6400       8.4        77       940        97
VIS    2025250    183200   21.8400  149.5200       9.5        75       988        90
VIS    2025250    183200   21.8300  149.3700       8.9        86       983        90
VIS    2025250    183200   21.8300  149.3700       8.9        86       957        92
VIS    2025250    183200   21.8200  149.3200       9.0        89       906        98
VIS    2025250    183200   21.8300  149.2900       9.0        91       886        99
VIS    2025250    183200   21.8200  149.2700       9.3        93       883        98
VIS    2025250    183200   21.8400  149.2600       9.5        93       883        98
VIS    2025250    183200   21.8400  149.2200       9.3        93       888        95
VIS    2025250    183200   21.8300  149.2100       9.4        91       898        96
VIS    2025250    183200   21.8300  149.1800       9.5        88       909        97
VIS    2025250    183200   21.8200  149.1600       9.6        85       928        99
VIS    2025250    183200   21.8200  149.1300       9.4        84       946       100
VIS    2025250    183200   21.8200  149.0900       9.6        85       912        97
VIS    2025250    183200   21.8200  149.0600      10.7        88       900        92
VIS    2025250    183200   21.8400  149.0500      10.8        90       898        90
VIS    2025250    183200   21.8200  149.0200      10.9        86       896        92
VIS    2025250    183200   21.8200  149.0000      10.5        83       891        92
VIS    2025250    183200   21.8200  148.9600       9.3        82       870        94
VIS    2025250    183200   21.8400  148.9500       9.0        85       866        95
VIS    2025250    183200   21.8300  148.9200       7.5        80       869        95
VIS    2025250    183200   21.8400  148.9000       6.8        78       884        92
VIS    2025250    183200   21.8400  148.8800       6.2        79       904        90
VIS    2025250    183200   21.8400  148.8600       5.9        82       903        91
VIS    2025250    183200   21.8300  148.8200       6.7        82       895        94
VIS    2025250    183200   21.8300  148.8100       6.8        81       895        94
VIS    2025250    183200   21.8200  148.7700       6.8        74       897        91
VIS    2025250    183200   21.8200  148.7300       7.1        79       902        90
VIS    2025250    183200   21.8300  148.7300       7.3        79       899        95
VIS    2025250    183200   21.8300  148.6800       8.4        85       887        99
VIS    2025250    183200   21.8200  148.6600       8.4        84       895        96
VIS    2025250    183200   21.8400  148.6500       8.3        83       895        98
VIS    2025250    183200   21.8200  148.6200       7.9        80       902        93
VIS    2025250    183200   21.8200  148.6000       7.9        81       902        95
VIS    2025250    183200   21.8300  148.5700       8.1        80       903        93
VIS    2025250    183200   21.8200  148.5300       8.0        77       903        94
VIS    2025250    183200   21.8100  148.5200       7.9        77       904        92
VIS    2025250    183200   21.8100  148.4900       8.0        78       902        92
VIS    2025250    183200   21.8300  148.4700       8.1        77       900        90
VIS    2025250    183200   21.8300  148.4200       7.9        76       896        91
VIS    2025250    183200   21.8200  148.3900       8.3        78       895        94
VIS    2025250    183200   21.8200  148.3600       8.6        83       895        95
VIS    2025250    183200   21.8100  148.3300       7.7        82       903        98
VIS    2025250    183200   21.8100  148.3200       7.3        82       904        98
VIS    2025250    183200   21.8100  148.2900       8.6        80       950        99
VIS    2025250    183200   21.8200  148.2600       9.8        77       951        96
VIS    2025250    183200   21.8300  148.2300       9.2        79       917        97
VIS    2025250    183200   21.8300  148.2200       9.1        79       917        97
VIS    2025250    183200   21.8300  148.2000       9.0        78       866        90
VIS    2025250    183200   21.8300  148.1500       8.9        82       926        98
VIS    2025250    183200   21.8200  148.1500       8.9        81       955        96
VIS    2025250    183200   21.8300  147.9700       9.8        79       958        92
VIS    2025250    183200   21.8200  147.9400       9.0        79       930        95
VIS    2025250    183200   21.8200  147.9300       8.6        79       930        91
VIS    2025250    183200   21.8200  147.8100       8.6        85       960        93
VIS    2025250    183200   21.8000  147.7700       9.7        94       898        98
VIS    2025250    183200   21.8100  147.7400       9.3        95       876        95
VIS    2025250    183200   21.8200  147.7300       9.2        99       894        91
VIS    2025250    183200   21.8200  147.6600       6.8       114       743        98
VIS    2025250    183200   21.8200  147.4400       8.2        91       820        94
VIS    2025250    183200   21.8000  147.4200       8.8        87       895        92
VIS    2025250    183200   21.8200  147.4000       9.3        89       923        96
VIS    2025250    183200   21.8100  147.3800       9.0        88       907        95
VIS    2025250    183200   21.8200  147.3500       8.8        96       863        97
VIS    2025250    183200   21.8000  147.3300       8.4       100       743        91
VIS    2025250    183200   21.8200  147.0900       8.4        97       955        90
VIS    2025250    183200   21.8000  147.0800       8.5        99       865        98
VIS    2025250    183200   21.7900  146.9800       8.0        84       943        91
VIS    2025250    183200   21.7800  145.6500      13.8        79       909        92
VIS    2025250    183200   21.7900  145.6200      13.4        80       909        93
VIS    2025250    183200   21.7900  145.6200      13.8        79       909        92
VIS    2025250    183200   21.7800  145.5600      16.2        70       925        90
VIS    2025250    183200   21.7800  145.5200      15.2        79       932        96
VIS    2025250    183200   21.7800  145.5100      15.1        80       932        96
VIS    2025250    183200   21.7900  145.4700      14.4        81       934        98
VIS    2025250    183200   21.7900  145.4600      14.2        83       934        98
VIS    2025250    183200   21.7800  145.4400      13.3        86       922        96
VIS    2025250    183200   21.7900  145.4100      14.1        87       920        97
VIS    2025250    183200   21.8000  145.3800      14.2        84       915        92
VIS    2025250    183200   21.7800  144.6000      10.5       106       836        96
VIS    2025250    183200   21.7800  144.5900      10.3       111       838        98
VIS    2025250    183200   21.7900  144.5500      12.9       108       880        95
VIS    2025250    183200   21.7800  144.5400      13.1       105       880        94
VIS    2025250    183200   21.7700  144.5100      12.0       109       816        94
VIS    2025250    183200   21.7600  143.7300      13.6        88       982        98
VIS    2025250    183200   21.7600  143.7100      13.1        88       978        98
VIS    2025250    183200   21.7700  143.7000      12.7        87       962        99
VIS    2025250    183200   21.7800  143.6600      12.6        84       964        93
VIS    2025250    183200   21.7800  143.6300      12.6        84       964        91
VIS    2025250    183200   21.7600  143.5700      10.7        85       980        92
VIS    2025250    183200   21.7600  143.5400      11.2        82       980        95
VIS    2025250    183200   21.7800  143.5100      12.1        82       983        95
VIS    2025250    183200   21.7800  143.4900      13.3        85       983        96
VIS    2025250    183200   21.7800  143.4700      14.2        88       984        96
VIS    2025250    183200   21.7800  143.4300      13.7        90       992        97
VIS    2025250    183200   21.7600  143.2500      10.2        92       958        96
VIS    2025250    183200   21.7800  143.2300      10.7        90       943        91
VIS    2025250    183200   21.7700  143.2200      10.6        88       943        90
VIS    2025250    183200   21.7800  143.1900      11.1        91       944        96
VIS    2025250    183200   21.7700  143.1600      10.9        95       951        95
VIS    2025250    183200   21.7700  143.1400      11.0        95       958        96
VIS    2025250    183200   21.7800  143.1300      11.5        95       958        97
VIS    2025250    183200   21.7800  143.1000      12.4        92       965        98
VIS    2025250    183200   21.7700  143.0800      12.3        90       961        99
VIS    2025250    183200   21.7600  143.0300      12.1        89       952        97
VIS    2025250    183200   21.7600  143.0200      11.9        90       953        97
VIS    2025250    183200   21.7800  142.9900      11.8        91       947        97
VIS    2025250    183200   21.7800  142.9700      11.3        93       944        95
VIS    2025250    183200   21.7800  142.9500      10.9        94       941        91
VIS    2025250    183200   21.7600  142.9100      10.7        89       939        96
VIS    2025250    183200   21.7600  142.8900      11.4        89       937        97
VIS    2025250    183200   21.7700  142.8800      11.5        88       939        96
VIS    2025250    183200   21.7600  142.8500      11.2        89       939        95
VIS    2025250    183200   21.7600  142.8300      10.3        92       939        93
VIS    2025250    183200   21.7700  142.8000      11.1        94       942        98
VIS    2025250    183200   21.7600  142.7600      11.3        89       939       100
VIS    2025250    183200   21.7700  142.7400      10.7        90       937        97
VIS    2025250    183200   21.7700  142.6700      12.2        99       947        94
VIS    2025250    183200   21.7800  142.6500      12.0        99       953        94
VIS    2025250    183200   21.7700  142.6100      10.3        94       955        95
VIS    2025250    183200   21.7700  142.5900      10.1        96       950        96
VIS    2025250    183200   21.7700  142.5600      10.5        96       942        91
VIS    2025250    183200   21.7500  142.5500       9.9        92       937        93
VIS    2025250    183200   21.7700  142.5200       9.8        99       933        94
VIS    2025250    183200   21.7500  142.4900       9.5       107       934        92
VIS    2025250    183200   21.8100  149.9400       8.9        98       918        95
VIS    2025250    183200   21.8200  149.9400       8.6        98       926        97
VIS    2025250    183200   21.8300  149.7000       9.0        76       963        90
VIS    2025250    183200   21.8100  149.6800       8.9        76       934        92
VIS    2025250    183200   21.8100  149.6600       8.7        76       929        93
VIS    2025250    183200   21.8100  149.6300       8.4        79       925        97
VIS    2025250    183200   21.8000  149.6100       8.8        80       940        92
VIS    2025250    183200   21.8100  149.3600       9.2        88       957        90
VIS    2025250    183200   21.8200  149.3200       9.2        90       906        98
VIS    2025250    183200   21.8100  149.3100       9.3        92       886        99
VIS    2025250    183200   21.8100  149.2800       9.3        93       883        99
VIS    2025250    183200   21.8100  149.2400       9.8        93       891        94
VIS    2025250    183200   21.8100  149.2200       9.9        92       901        95
VIS    2025250    183200   21.8000  149.2000       9.8        89       901        96
VIS    2025250    183200   21.8000  149.1600       9.4        85       901        97
VIS    2025250    183200   21.8000  149.1500       9.4        84       901        97
VIS    2025250    183200   21.8000  149.1200       9.4        83       909        98
VIS    2025250    183200   21.8000  149.1100       9.6        84       912        97
VIS    2025250    183200   21.8000  149.0600      10.8        87       900        92
VIS    2025250    183200   21.8000  149.0400      11.0        88       896        92
VIS    2025250    183200   21.8000  149.0100      10.9        85       891        91
VIS    2025250    183200   21.8000  149.0000      10.6        83       891        92
VIS    2025250    183200   21.8000  148.9800      10.1        81       879        92
VIS    2025250    183200   21.8100  148.9400       8.1        81       869        96
VIS    2025250    183200   21.8100  148.9300       7.8        81       869        96
VIS    2025250    183200   21.8100  148.9100       7.2        82       885        96
VIS    2025250    183200   21.8100  148.8800       6.8        82       898        92
VIS    2025250    183200   21.8100  148.8300       6.5        87       903        94
VIS    2025250    183200   21.8000  148.8300       6.4        86       909        91
VIS    2025250    183200   21.8000  148.7900       7.1        76       897        95
VIS    2025250    183200   21.8000  148.7600       6.9        75       902        93
VIS    2025250    183200   21.8100  148.7500       7.1        76       909        92
VIS    2025250    183200   21.8100  148.7100       7.9        83       887        95
VIS    2025250    183200   21.7900  148.6800       8.4        84       887        96
VIS    2025250    183200   21.8100  148.6800       8.5        85       887        96
VIS    2025250    183200   21.8100  148.6500       8.2        80       895        93
VIS    2025250    183200   21.7900  148.6000       8.1        81       907        96
VIS    2025250    183200   21.8000  148.5800       8.3        84       904        98
VIS    2025250    183200   21.7900  148.5700       8.4        83       908        99
VIS    2025250    183200   21.8000  148.5300       8.0        77       910        94
VIS    2025250    183200   21.8000  148.5100       7.8        77       905        90
VIS    2025250    183200   21.8000  148.5000       7.9        79       904        91
VIS    2025250    183200   21.7900  148.4500       8.1        80       900        95
VIS    2025250    183200   21.7900  148.4500       8.0        79       900        95
VIS    2025250    183200   21.7900  148.4100       8.0        82       896        94
VIS    2025250    183200   21.7900  148.3900       8.4        83       895        93
VIS    2025250    183200   21.8100  148.3500       8.5        83       895        98
VIS    2025250    183200   21.7900  148.3200       7.7        81       913        98
VIS    2025250    183200   21.7900  148.3000       8.3        81       925        98
VIS    2025250    183200   21.7900  148.2700       9.2        80       951        98
VIS    2025250    183200   21.8000  148.2600       9.7        77       953        95
VIS    2025250    183200   21.8000  148.2300       9.4        75       951        93
VIS    2025250    183200   21.8000  148.2200       9.2        73       925        90
VIS    2025250    183200   21.8000  147.9700      10.4        74       967        97
VIS    2025250    183200   21.7900  147.9300       9.2        79       965        93
VIS    2025250    183200   21.7900  147.9300       9.0        79       961        92
VIS    2025250    183200   21.7800  147.8100       8.8        86       924        97
VIS    2025250    183200   21.7800  147.7900       9.3        88       901        99
VIS    2025250    183200   21.7900  147.7600       9.4        93       882        98
VIS    2025250    183200   21.7800  147.7500       8.8        92       882        92
VIS    2025250    183200   21.7900  147.7300       8.8       100       872        90
VIS    2025250    183200   21.7900  147.7000       7.8       106       812        90
VIS    2025250    183200   21.7900  147.6600       6.4       120       734        96
VIS    2025250    183200   21.7900  147.4300       8.8        84       880        90
VIS    2025250    183200   21.7900  147.3900       9.2        93       888        95
VIS    2025250    183200   21.7800  147.3700      10.2       102       870        95
VIS    2025250    183200   21.7900  147.3400       8.3       101       794        94
VIS    2025250    183200   21.7700  147.3200       7.7        93       746        91
VIS    2025250    183200   21.7800  147.0900       8.7       103       865        96
VIS    2025250    183200   21.7700  147.0600       8.2        96       865        93
VIS    2025250    183200   21.7700  147.0200       7.9        87       918        91
VIS    2025250    183200   21.7700  147.0200       7.7        84       918        91
VIS    2025250    183200   21.7800  146.9800       8.3        84       943        92
VIS    2025250    183200   21.7600  145.5700      15.7        70       920        91
VIS    2025250    183200   21.7600  145.5500      15.8        72       938        93
VIS    2025250    183200   21.7600  145.5100      15.3        82       932        95
VIS    2025250    183200   21.7600  145.5000      14.9        81       933        96
VIS    2025250    183200   21.7600  145.4600      12.7        86       905        96
VIS    2025250    183200   21.7700  145.4600      13.2        86       929        99
VIS    2025250    183200   21.7700  145.4300      12.5        89       897        96
VIS    2025250    183200   21.7600  145.3500       9.2       101       713        91
VIS    2025250    183200   21.7600  144.5900      10.0       114       814        97
VIS    2025250    183200   21.7600  144.5200      11.3       116       809        92
VIS    2025250    183200   21.7500  143.7600      15.8        84       900        90
VIS    2025250    183200   21.7600  143.7200      13.6        87       982        98
VIS    2025250    183200   21.7600  143.7200      13.4        87       982        98
VIS    2025250    183200   21.7500  143.6800      12.5        83       979        94
VIS    2025250    183200   21.7400  143.6600      14.0        79       981        92
VIS    2025250    183200   21.7400  143.6200      10.9        83       977        92
VIS    2025250    183200   21.7400  143.6100      10.5        87       967        91
VIS    2025250    183200   21.7600  143.5500      11.7        82       975        98
VIS    2025250    183200   21.7600  143.5400      11.6        82       975        96
VIS    2025250    183200   21.7600  143.5100      13.1        83       980        95
VIS    2025250    183200   21.7500  143.4900      14.0        88       983        96
VIS    2025250    183200   21.7500  143.4500      13.6        90       992        97
VIS    2025250    183200   21.7400  143.4300      12.3        86       988        96
VIS    2025250    183200   21.7400  143.2800      11.0        95       961        94
VIS    2025250    183200   21.7300  143.2600      11.1        94       958        95
VIS    2025250    183200   21.7300  143.2300      10.9        95       941        92
VIS    2025250    183200   21.7300  143.2000      10.8        93       938        95
VIS    2025250    183200   21.7300  143.1900      10.8        93       938        96
VIS    2025250    183200   21.7400  143.1500      10.4        95       941        93
VIS    2025250    183200   21.7400  143.1400      10.4        95       941        93
VIS    2025250    183200   21.7500  143.1200      10.8        94       958        96
VIS    2025250    183200   21.7300  143.0800      11.8        91       960        98
VIS    2025250    183200   21.7300  143.0500      11.6        89       962        98
VIS    2025250    183200   21.7300  143.0400      11.2        87       959        98
VIS    2025250    183200   21.7500  143.0200      11.8        89       955        98
VIS    2025250    183200   21.7500  142.9900      10.9        92       949        95
VIS    2025250    183200   21.7300  142.9500       9.9        94       938        95
VIS    2025250    183200   21.7400  142.9400      10.2        93       937        96
VIS    2025250    183200   21.7400  142.9000      11.4        89       936        99
VIS    2025250    183200   21.7300  142.9000      11.5        90       936        99
VIS    2025250    183200   21.7500  142.8600      11.4        91       936        96
VIS    2025250    183200   21.7300  142.8500      11.1        96       935        95
VIS    2025250    183200   21.7300  142.8000      10.9        91       938        95
VIS    2025250    183200   21.7300  142.7800      11.1        92       939        92
VIS    2025250    183200   21.7400  142.7600      11.0        90       939        98
VIS    2025250    183200   21.7400  142.7500      10.6        90       939        97
VIS    2025250    183200   21.7300  142.6900       6.7        98       956        90
VIS    2025250    183200   21.7300  142.6700       7.9       106       956        91
VIS    2025250    183200   21.7300  142.6300      10.8       102       946        93
VIS    2025250    183200   21.7300  142.6200      11.1       100       946        95
VIS    2025250    183200   21.7300  142.5800      10.2        93       944        97
VIS    2025250    183200   21.7300  142.5700      10.1        93       940        97
VIS    2025250    183200   21.7400  142.5400       9.7        91       937        94
VIS    2025250    183200   21.7400  142.5200       9.6        94       937        96
VIS    2025250    183200   21.7500  142.4900       9.6       108       934        92
VIS    2025250    183200   21.7300  142.4600       9.9       101       936        91
VIS    2025250    183200   21.7900  150.1100       9.3        92       941        90
VIS    2025250    183200   21.7800  149.9700       9.0        98       937        91
VIS    2025250    183200   21.7900  149.9500       9.0        97       913        95
VIS    2025250    183200   21.8000  149.9300       8.9        97       916        96
VIS    2025250    183200   21.7800  149.9000       8.8        96       916        97
VIS    2025250    183200   21.7900  149.7100       8.6        74       980        93
VIS    2025250    183200   21.7800  149.6700       8.9        74       929        93
VIS    2025250    183200   21.8000  149.6500       8.2        78       925        97
VIS    2025250    183200   21.8000  149.6300       8.2        79       925        97
VIS    2025250    183200   21.7800  149.4000       8.9        84       981        91
VIS    2025250    183200   21.7700  149.3500       9.9        90       932        91
VIS    2025250    183200   21.7800  149.3400       9.9        90       932        90
VIS    2025250    183200   21.7700  149.3000       9.8        91       892        98
VIS    2025250    183200   21.7800  149.2800       9.5        92       890        98
VIS    2025250    183200   21.7900  149.2500       9.8        93       891        93
VIS    2025250    183200   21.7800  149.2300      10.0        91       911        95
VIS    2025250    183200   21.7900  149.2000       9.9        88       901        95
VIS    2025250    183200   21.7800  149.1700       9.6        86       901        95
VIS    2025250    183200   21.7900  149.1500       9.4        84       901        97
VIS    2025250    183200   21.7900  149.1200       9.3        84       893        95
VIS    2025250    183200   21.7800  149.1200       9.4        84       893        94
VIS    2025250    183200   21.7700  149.0800      10.4        86       893        92
VIS    2025250    183200   21.7700  149.0500      10.8        86       901        92
VIS    2025250    183200   21.7900  149.0400      10.9        87       896        92
VIS    2025250    183200   21.7800  148.9900      10.3        83       886        92
VIS    2025250    183200   21.7900  148.9900      10.3        82       886        93
VIS    2025250    183200   21.7700  148.9600       9.2        84       873        94
VIS    2025250    183200   21.7800  148.9300       8.4        85       877        96
VIS    2025250    183200   21.7800  148.9100       7.5        83       886        94
VIS    2025250    183200   21.7700  148.7900       7.2        73       916        93
VIS    2025250    183200   21.7700  148.7700       7.2        76       897        94
VIS    2025250    183200   21.7700  148.7600       7.5        84       889        97
VIS    2025250    183200   21.7800  148.7300       8.2        86       887        97
VIS    2025250    183200   21.7700  148.7100       8.5        84       887        98
VIS    2025250    183200   21.7900  148.6800       8.5        83       887        96
VIS    2025250    183200   21.7600  148.6500       8.1        77       890        91
VIS    2025250    183200   21.7800  148.6300       8.2        78       897        92
VIS    2025250    183200   21.7800  148.6100       8.2        80       902        94
VIS    2025250    183200   21.7800  148.5800       8.3        82       911        98
VIS    2025250    183200   21.7600  148.5300       7.9        73       920        95
VIS    2025250    183200   21.7800  148.5200       7.9        76       911        91
VIS    2025250    183200   21.7700  148.4600       8.3        81       900        96
VIS    2025250    183200   21.7800  148.4500       8.1        80       900        95
VIS    2025250    183200   21.7600  148.4200       8.3        81       897        94
VIS    2025250    183200   21.7700  148.4000       8.3        85       895        91
VIS    2025250    183200   21.7800  148.3800       8.6        84       894        94
VIS    2025250    183200   21.7600  148.3400       8.5        83       903        98
VIS    2025250    183200   21.7600  148.3300       8.5        83       910        97
VIS    2025250    183200   21.7800  148.3000       8.2        81       925        96
VIS    2025250    183200   21.7600  148.2800       8.5        77       905        93
VIS    2025250    183200   21.7800  148.2400       9.3        75       947        94
VIS    2025250    183200   21.7800  148.1600       9.1        81       950        92
VIS    2025250    183200   21.7600  148.1500       9.4        82       979        94
VIS    2025250    183200   21.7600  147.9500       9.9        75       968        94
VIS    2025250    183200   21.7800  147.9300       9.6        80       973        96
VIS    2025250    183200   21.7600  147.9000       9.0        81       967        98
VIS    2025250    183200   21.7500  147.8700       7.8        81       902        91
VIS    2025250    183200   21.7700  147.8200       8.6        85       902        96
VIS    2025250    183200   21.7600  147.7900       9.1        86       909        97
VIS    2025250    183200   21.7600  147.7700       9.1        89       901        93
VIS    2025250    183200   21.7700  147.7600       9.0        89       900        93
VIS    2025250    183200   21.7600  147.6000       8.6        82       843        90
VIS    2025250    183200   21.7600  147.5600       6.6        87       795        90
VIS    2025250    183200   21.7700  147.5000       8.1       104       741        91
VIS    2025250    183200   21.7600  147.3900      10.1       102       876        95
VIS    2025250    183200   21.7500  147.3800      10.3       102       876        95
VIS    2025250    183200   21.7500  147.3600      10.4       103       863        98
VIS    2025250    183200   21.7700  147.3100       7.6        92       742        90
VIS    2025250    183200   21.7500  147.3000       8.1       101       746        94
VIS    2025250    183200   21.7600  147.0900       9.1       103       853        98
VIS    2025250    183200   21.7600  147.0800       8.4       101       853        96
VIS    2025250    183200   21.7600  147.0500       8.2        95       865        93
VIS    2025250    183200   21.7600  146.9900       8.6        84       935        91
VIS    2025250    183200   21.7600  146.9800       8.7        83       943        90
VIS    2025250    183200   21.7400  145.5400      15.6        81       932        96
VIS    2025250    183200   21.7300  145.5100      15.3        81       913        93
VIS    2025250    183200   21.7300  145.5000      15.1        81       916        93
VIS    2025250    183200   21.7500  145.4800      13.1        85       913        97
VIS    2025250    183200   21.7400  145.4500      11.3        91       897        98
VIS    2025250    183200   21.7400  145.3500       9.4       107       702        93
VIS    2025250    183200   21.7300  145.0100      12.0       101       753        91
VIS    2025250    183200   21.7100  143.7700      13.2        86       907        98
VIS    2025250    183200   21.7300  143.7400      13.5        83       934        99
VIS    2025250    183200   21.7200  143.7300      12.6        80       956        97
VIS    2025250    183200   21.7300  143.6900      13.2        80       979        92
VIS    2025250    183200   21.7300  143.6800      13.4        78       979        92
VIS    2025250    183200   21.7200  143.6600      14.6        78       979        92
VIS    2025250    183200   21.7200  143.6300      12.7        81       967        97
VIS    2025250    183200   21.7200  143.5900      11.2        86       966        92
VIS    2025250    183200   21.7300  143.5700      12.6        84       961        95
VIS    2025250    183200   21.7300  143.5500      12.5        83       961        97
VIS    2025250    183200   21.7200  143.5300      12.0        81       958        96
VIS    2025250    183200   21.7100  143.5000      13.0        86       954        98
VIS    2025250    183200   21.7200  143.4700      13.8        89       967        98
VIS    2025250    183200   21.7100  143.4400      13.0        87       983        97
VIS    2025250    183200   21.7100  143.4300      12.7        86       987        96
VIS    2025250    183200   21.7200  143.4100      12.6        87       981        93
VIS    2025250    183200   21.7200  143.3600      11.9        90       981        90
VIS    2025250    183200   21.7200  143.3200      11.2        95       988        93
VIS    2025250    183200   21.7200  143.3000      11.5        93       977        95
VIS    2025250    183200   21.7100  143.2800      11.9        90       962        98
VIS    2025250    183200   21.7300  143.2600      11.2        94       958        95
VIS    2025250    183200   21.7100  143.2200      11.7        93       941        96
VIS    2025250    183200   21.7200  143.2100      11.1        94       939        96
VIS    2025250    183200   21.7100  143.1800      11.7        93       939        97
VIS    2025250    183200   21.7100  143.1400      11.3        92       941        96
VIS    2025250    183200   21.7100  143.1400      11.5        91       941        96
VIS    2025250    183200   21.7200  143.0900      11.8        89       958        98
VIS    2025250    183200   21.7300  143.0800      11.7        91       960        97
VIS    2025250    183200   21.7300  143.0500      11.2        88       960        97
VIS    2025250    183200   21.7100  143.0200      11.1        81       955        99
VIS    2025250    183200   21.7100  143.0100      11.0        81       947        98
VIS    2025250    183200   21.7200  142.9800       9.2        95       947        93
VIS    2025250    183200   21.7200  142.9500      10.0        94       938        97
VIS    2025250    183200   21.7100  142.9200      11.8        92       937        99
VIS    2025250    183200   21.7100  142.8900      11.7        91       937        99
VIS    2025250    183200   21.7100  142.8700      11.5        93       937        99
VIS    2025250    183200   21.7200  142.8500      11.4        97       935        96
VIS    2025250    183200   21.7200  142.8400      11.2        98       935        96
VIS    2025250    183200   21.7300  142.8000      11.3        93       938        93
VIS    2025250    183200   21.7300  142.7900      11.4        93       939        91
VIS    2025250    183200   21.7200  142.7600      11.1        94       939        93
VIS    2025250    183200   21.7100  142.7300      10.1        96       936        96
VIS    2025250    183200   21.7200  142.7100       8.9        95       938        96
VIS    2025250    183200   21.7100  142.6800       9.4        97       946        95
VIS    2025250    183200   21.7100  142.6500      10.8       100       946        93
VIS    2025250    183200   21.7200  142.6400      10.6       103       946        92
VIS    2025250    183200   21.7200  142.6000      11.0        95       944        98
VIS    2025250    183200   21.7200  142.5900      10.6        94       944        98
VIS    2025250    183200   21.7100  142.5600       9.8        89       936        95
VIS    2025250    183200   21.7100  142.5300       9.7        93       937        96
VIS    2025250    183200   21.7000  142.5000       9.7        96       937        91
VIS    2025250    183200   21.7000  142.4900       9.7        94       937        92
VIS    2025250    183200   21.7800  150.1000       9.2        92       938        91
VIS    2025250    183200   21.7600  150.0700       9.2        93       929        94
VIS    2025250    183200   21.7600  150.0500       9.4        94       938        90
VIS    2025250    183200   21.7600  149.9700       9.0        95       937        90
VIS    2025250    183200   21.7600  149.9400       9.2        97       907        93
VIS    2025250    183200   21.7600  149.9300       9.2        98       907        94
VIS    2025250    183200   21.7700  149.8800       8.9        96       914        97
VIS    2025250    183200   21.7600  149.8800       8.8        97       914        98
VIS    2025250    183200   21.7600  149.7000       8.4        79       980        93
VIS    2025250    183200   21.7600  149.6800       8.6        80       977        92
VIS    2025250    183200   21.7500  149.6600       9.0        80       958        91
VIS    2025250    183200   21.7600  149.6200       8.9        80       940        90
VIS    2025250    183200   21.7600  149.4000       9.0        86       981        90
VIS    2025250    183200   21.7600  149.3900       9.2        85       977        90
VIS    2025250    183200   21.7600  149.3600       9.7        88       935        92
VIS    2025250    183200   21.7500  149.3300      10.0        89       899        97
VIS    2025250    183200   21.7500  149.3200      10.0        89       899        97
VIS    2025250    183200   21.7500  149.2800       9.8        89       899        97
VIS    2025250    183200   21.7500  149.2700       9.9        89       904        96
VIS    2025250    183200   21.7700  149.2300       9.9        92       919        96
VIS    2025250    183200   21.7700  149.2200      10.0        92       919        96
VIS    2025250    183200   21.7700  149.1800       9.5        87       901        95
VIS    2025250    183200   21.7600  149.1500       9.2        85       893        93
VIS    2025250    183200   21.7700  149.1400       9.2        84       893        94
VIS    2025250    183200   21.7600  149.1000      10.0        85       892        91
VIS    2025250    183200   21.7500  149.0500      10.8        85       904        93
VIS    2025250    183200   21.7500  149.0400      10.8        84       909        93
VIS    2025250    183200   21.7400  149.0000      10.3        82       885        92
VIS    2025250    183200   21.7500  148.9700       9.3        83       873        92
VIS    2025250    183200   21.7500  148.9400       8.4        84       873        96
VIS    2025250    183200   21.7600  148.9400       8.5        85       877        97
VIS    2025250    183200   21.7500  148.9100       7.4        81       880        96
VIS    2025250    183200   21.7400  148.8900       7.0        80       924        90
VIS    2025250    183200   21.7600  148.7900       7.3        73       909        92
VIS    2025250    183200   21.7400  148.7600       7.7        88       887        94
VIS    2025250    183200   21.7400  148.7400       7.9        88       889        96
VIS    2025250    183200   21.7500  148.7000       8.5        83       890        97
VIS    2025250    183200   21.7500  148.6900       8.4        80       892        96
VIS    2025250    183200   21.7400  148.6500       7.6        76       894        91
VIS    2025250    183200   21.7500  148.5900       8.1        76       935        91
VIS    2025250    183200   21.7500  148.5700       8.0        74       935        93
VIS    2025250    183200   21.7400  148.5600       7.8        72       933        93
VIS    2025250    183200   21.7600  148.5300       7.9        73       927        96
VIS    2025250    183200   21.7400  148.5000       8.2        80       902        99
VIS    2025250    183200   21.7400  148.4800       8.5        80       900        98
VIS    2025250    183200   21.7500  148.4400       8.5        80       900        97
VIS    2025250    183200   21.7400  148.4300       8.8        81       896        99
VIS    2025250    183200   21.7400  148.3900       8.5        82       895        97
VIS    2025250    183200   21.7400  148.3700       8.4        81       900        99
VIS    2025250    183200   21.7400  148.3500       8.7        83       908        97
VIS    2025250    183200   21.7400  148.3300       8.8        83       910        95
VIS    2025250    183200   21.7500  148.2800       8.2        75       905        90
VIS    2025250    183200   21.7400  148.2400       8.1        70       908        93
VIS    2025250    183200   21.7500  148.2300       8.5        71       926        94
VIS    2025250    183200   21.7300  148.1600       9.6        80       992        98
VIS    2025250    183200   21.7500  148.0300       9.8        77       967        95
VIS    2025250    183200   21.7300  147.9400      10.8        81       984        95
VIS    2025250    183200   21.7400  147.9400      10.1        81       979        98
VIS    2025250    183200   21.7300  147.8900       9.2        82       959        98
VIS    2025250    183200   21.7300  147.8800       8.7        83       923        98
VIS    2025250    183200   21.7500  147.8700       7.9        81       880        90
VIS    2025250    183200   21.7300  147.8200       8.8        85       880        96
VIS    2025250    183200   21.7400  147.8100       8.8        85       881        95
VIS    2025250    183200   21.7300  147.7800       9.3        88       929        90
VIS    2025250    183200   21.7300  147.6300       8.3        96       860        99
VIS    2025250    183200   21.7300  147.5900       8.5        75       858        91
VIS    2025250    183200   21.7400  147.5200       8.1       115       717        90
VIS    2025250    183200   21.7200  147.4500       8.7        86       788        91
VIS    2025250    183200   21.7400  147.4400       8.8        89       837        94
VIS    2025250    183200   21.7300  147.4000       9.6        94       878        97
VIS    2025250    183200   21.7300  147.3800       9.8        96       881        96
VIS    2025250    183200   21.7400  147.3600      10.4       101       870        97
VIS    2025250    183200   21.7300  147.3100       9.6       106       774        90
VIS    2025250    183200   21.7200  147.2900       8.9       107       777        97
VIS    2025250    183200   21.7200  147.2800       9.3       111       777        95
VIS    2025250    183200   21.7200  147.1900       9.4       116       748        90
VIS    2025250    183200   21.7200  147.1800       9.7       117       747        90
VIS    2025250    183200   21.7300  147.1000       9.8       101       827        95
VIS    2025250    183200   21.7200  147.0100       8.7        80       963        92
VIS    2025250    183200   21.7200  145.5500      15.7        84       901        92
VIS    2025250    183200   21.7100  145.5200      15.7        81       918        93
VIS    2025250    183200   21.7200  145.5100      15.2        81       916        94
VIS    2025250    183200   21.7000  143.7900      12.2        89       882        95
VIS    2025250    183200   21.7000  143.7800      12.4        88       893        97
VIS    2025250    183200   21.7000  143.7500      12.4        84       933        99
VIS    2025250    183200   21.7000  143.6500      14.5        80       956        96
VIS    2025250    183200   21.7000  143.6200      12.6        82       966        97
VIS    2025250    183200   21.7000  143.6100      12.2        83       966        97
VIS    2025250    183200   21.7000  143.5700      11.0        81       961        94
VIS    2025250    183200   21.6900  143.5500      10.5        78       945        90
VIS    2025250    183200   21.6800  143.5300      11.0        79       940        90
VIS    2025250    183200   21.6900  143.5100      11.9        82       940        94
VIS    2025250    183200   21.6800  143.4700      14.4        87       941        98
VIS    2025250    183200   21.6900  143.4500      13.7        87       947        98
VIS    2025250    183200   21.7000  143.4200      12.0        86       957        94
VIS    2025250    183200   21.7000  143.4000      12.2        87       957        95
VIS    2025250    183200   21.6900  143.3900      12.1        86       950        97
VIS    2025250    183200   21.6800  143.3600      10.6        86       945        94
VIS    2025250    183200   21.7000  143.3400      10.3        92       970        94
VIS    2025250    183200   21.6800  143.3100      10.7        90       962        94
VIS    2025250    183200   21.6800  143.2700      12.4        86       943        98
VIS    2025250    183200   21.6800  143.2600      12.5        86       943        97
VIS    2025250    183200   21.6900  143.2400      12.0        88       941        97
VIS    2025250    183200   21.6800  143.2000      13.0        89       939        96
VIS    2025250    183200   21.6900  143.1900      12.6        91       939        97
VIS    2025250    183200   21.7000  143.1500      11.2        93       941        96
VIS    2025250    183200   21.7000  143.1400      11.4        92       941        97
VIS    2025250    183200   21.6800  143.1000      12.5        86       937        96
VIS    2025250    183200   21.6800  143.0900      11.7        86       937        99
VIS    2025250    183200   21.7000  143.0500      10.7        86       948        97
VIS    2025250    183200   21.7000  143.0400      11.0        84       947        99
VIS    2025250    183200   21.6900  143.0100      12.0        80       947        97
VIS    2025250    183200   21.7000  142.9800      10.1        88       941        93
VIS    2025250    183200   21.7000  142.9700       9.4        91       940        92
VIS    2025250    183200   21.7000  142.9200      11.4        93       937        98
VIS    2025250    183200   21.7000  142.9200      11.6        93       937        98
VIS    2025250    183200   21.7000  142.8700      11.3        91       937        99
VIS    2025250    183200   21.7000  142.8700      11.4        93       937        99
VIS    2025250    183200   21.6900  142.8400      11.3        91       936        97
VIS    2025250    183200   21.6800  142.8000      12.0        94       936        94
VIS    2025250    183200   21.7000  142.7700      11.8        95       939        91
VIS    2025250    183200   21.6900  142.7300      11.2        94       935        99
VIS    2025250    183200   21.6800  142.7000      12.7        90       935        97
VIS    2025250    183200   21.6800  142.6900      12.7        89       935        98
VIS    2025250    183200   21.6900  142.6700      11.8        89       936        97
VIS    2025250    183200   21.6900  142.6500      12.1        91       935        95
VIS    2025250    183200   21.6900  142.6000      11.2        92       935        97
VIS    2025250    183200   21.6900  142.6000      11.2        91       935        99
VIS    2025250    183200   21.6900  142.5600       9.5        89       936        97
VIS    2025250    183200   21.6800  142.5300       9.3        96       935        96
VIS    2025250    183200   21.6800  142.5200       9.3        97       935        96
VIS    2025250    183200   21.6900  142.4900       9.5        95       936        90
VIS    2025250    183200   21.7500  150.1100       9.4        91       938        92
VIS    2025250    183200   21.7500  150.1000       9.4        91       938        90
VIS    2025250    183200   21.7400  150.0600       9.4        92       926        95
VIS    2025250    183200   21.7400  150.0400       9.5        92       926        94
VIS    2025250    183200   21.7400  150.0300       9.2        90       919        97
VIS    2025250    183200   21.7400  149.9600       9.1        95       893        94
VIS    2025250    183200   21.7500  149.9300       9.3        99       895        94
VIS    2025250    183200   21.7500  149.9300       9.3       100       893        95
VIS    2025250    183200   21.7400  149.8900       9.2       101       912        94
VIS    2025250    183200   21.7300  149.8500       8.1        99       930        93
VIS    2025250    183200   21.7400  149.6600       9.2        81       943        91
VIS    2025250    183200   21.7400  149.6400       9.6        82       921        92
VIS    2025250    183200   21.7300  149.3900       9.6        88       940        91
VIS    2025250    183200   21.7300  149.3800       9.7        87       938        90
VIS    2025250    183200   21.7400  149.3300       9.9        88       901        97
VIS    2025250    183200   21.7300  149.3100      10.0        88       901        94
VIS    2025250    183200   21.7300  149.2900      10.1        89       919        92
VIS    2025250    183200   21.7400  149.2600       9.9        88       912        94
VIS    2025250    183200   21.7200  149.2300       9.9        87       934        96
VIS    2025250    183200   21.7300  149.2000       9.8        88       925        95
VIS    2025250    183200   21.7200  149.1800      10.1        87       919        94
VIS    2025250    183200   21.7200  149.1700      10.1        86       921        94
VIS    2025250    183200   21.7400  149.1400       9.8        85       897        90
VIS    2025250    183200   21.7200  149.1100      10.3        82       904        92
VIS    2025250    183200   21.7200  149.0200      10.9        82       904        90
VIS    2025250    183200   21.7300  149.0200      10.9        82       904        91
VIS    2025250    183200   21.7200  148.9900      10.4        81       887        92
VIS    2025250    183200   21.7300  148.9700       9.3        82       873        95
VIS    2025250    183200   21.7200  148.9400       7.6        81       875        97
VIS    2025250    183200   21.7300  148.9000       6.9        78       910        94
VIS    2025250    183200   21.7400  148.8900       6.9        79       911        93
VIS    2025250    183200   21.7200  148.8700       7.4        77       938        96
VIS    2025250    183200   21.7200  148.8200       7.4        68       947        94
VIS    2025250    183200   21.7300  148.8100       7.6        70       932        90
VIS    2025250    183200   21.7300  148.7800       7.8        81       893        93
VIS    2025250    183200   21.7100  148.7600       8.2        88       889        95
VIS    2025250    183200   21.7300  148.7400       7.9        88       889        95
VIS    2025250    183200   21.7300  148.7000       8.1        82       893        96
VIS    2025250    183200   21.7300  148.6900       8.0        79       893        97
VIS    2025250    183200   21.7200  148.5900       7.7        71       957        93
VIS    2025250    183200   21.7100  148.5700       7.9        71       929        93
VIS    2025250    183200   21.7200  148.5600       7.8        71       933        92
VIS    2025250    183200   21.7100  148.5200       8.3        79       910        98
VIS    2025250    183200   21.7100  148.5100       8.3        81       909        99
VIS    2025250    183200   21.7300  148.4900       8.4        80       900        99
VIS    2025250    183200   21.7200  148.4500       8.7        80       900        98
VIS    2025250    183200   21.7300  148.4300       8.8        80       898        99
VIS    2025250    183200   21.7100  148.3900       8.4        76       899        99
VIS    2025250    183200   21.7200  148.3700       8.4        80       901        99
VIS    2025250    183200   21.7100  148.3500       8.7        82       908        97
VIS    2025250    183200   21.7300  148.3300       8.6        83       909        95
VIS    2025250    183200   21.7200  148.3000       7.7        81       909        93
VIS    2025250    183200   21.7200  148.2800       7.5        79       907        90
VIS    2025250    183200   21.7200  148.2500       7.8        73       911        92
VIS    2025250    183200   21.7100  148.2300       7.7        71       914        92
VIS    2025250    183200   21.7100  148.1900       8.7        78       995        97
VIS    2025250    183200   21.7200  148.1800       9.4        80       997        98
VIS    2025250    183200   21.7300  148.1500       9.5        79       992        98
VIS    2025250    183200   21.7200  147.9200      10.9        80       980        95
VIS    2025250    183200   21.7100  147.9100      10.3        80       968        95
VIS    2025250    183200   21.7100  147.8700       9.3        84       923        97
VIS    2025250    183200   21.7000  147.8500       9.4        86       898        98
VIS    2025250    183200   21.7100  147.8400       9.4        86       889        97
VIS    2025250    183200   21.7000  147.8200       9.4        85       884        96
VIS    2025250    183200   21.7100  147.7900       9.3        88       881        94
VIS    2025250    183200   21.7000  147.7700       9.3        93       832        91
VIS    2025250    183200   21.7000  147.6400       7.3        84       860        95
VIS    2025250    183200   21.7000  147.6200       7.4        83       860        95
VIS    2025250    183200   21.7100  147.5900       7.6        79       858        94
VIS    2025250    183200   21.7200  147.5900       7.9        77       854        93
VIS    2025250    183200   21.7000  147.5000       8.5       107       737        92
VIS    2025250    183200   21.7200  147.4300       8.3        92       854        96
VIS    2025250    183200   21.7100  147.3900       9.8        89       881        96
VIS    2025250    183200   21.7200  147.3800       9.6        89       883        95
VIS    2025250    183200   21.7000  147.3600       9.8        89       887        93
VIS    2025250    183200   21.7200  147.3300       9.7       101       831        92
VIS    2025250    183200   21.7200  147.3100       9.7       105       792        94
VIS    2025250    183200   21.7000  147.2800       9.4       105       826        99
VIS    2025250    183200   21.7100  147.2500      10.2       114       843        91
VIS    2025250    183200   21.7100  147.2200       9.3       114       850        97
VIS    2025250    183200   21.7100  147.2000       8.9       117       810        94
VIS    2025250    183200   21.7100  147.1100       9.6       103       752        90
VIS    2025250    183200   21.7100  147.0200       8.7        80       963        91
VIS    2025250    183200   21.6900  146.9900       8.4        80       973        92
VIS    2025250    183200   21.6800  145.6500      15.3        85       916        95
VIS    2025250    183200   21.6900  145.5200      15.8        80       932        93
VIS    2025250    183200   21.6900  145.5200      15.8        80       932        93
VIS    2025250    183200   21.6700  144.0800       9.5       116       727        95
VIS    2025250    183200   21.6700  144.0100      10.4       106       786        92
VIS    2025250    183200   21.6800  143.7800      11.5        91       893        97
VIS    2025250    183200   21.6700  143.7600      11.5        87       929        99
VIS    2025250    183200   21.6600  143.7300      12.6        85       925        98
VIS    2025250    183200   21.6600  143.7200      13.2        84       926        98
VIS    2025250    183200   21.6700  143.6800      13.3        85       932        98
VIS    2025250    183200   21.6700  143.6600      13.0        89       934        94
VIS    2025250    183200   21.6700  143.6300      13.1        87       956        94
VIS    2025250    183200   21.6800  143.6300      13.1        86       956        95
VIS    2025250    183200   21.6600  143.5600      10.5        82       935        95
VIS    2025250    183200   21.6800  143.5500      10.2        77       944        90
VIS    2025250    183200   21.6700  143.5200      12.2        81       938        97
VIS    2025250    183200   21.6600  143.4800      13.6        85       938        99
VIS    2025250    183200   21.6600  143.4800      13.6        85       941        99
VIS    2025250    183200   21.6600  143.4300      12.2        87       951        95
VIS    2025250    183200   21.6700  143.4200      11.0        86       951        93
VIS    2025250    183200   21.6600  143.3900      10.4        87       941        95
VIS    2025250    183200   21.6600  143.3300      10.4        85       944        93
VIS    2025250    183200   21.6600  143.3300      10.2        87       944        92
VIS    2025250    183200   21.6800  143.2800      12.0        88       948        98
VIS    2025250    183200   21.6800  143.2700      12.8        84       943       100
VIS    2025250    183200   21.6600  143.2500      12.7        85       937        98
VIS    2025250    183200   21.6700  143.2100      12.7        89       937        95
VIS    2025250    183200   21.6800  143.2000      13.0        89       939        96
VIS    2025250    183200   21.6700  143.1800      13.0        91       937        96
VIS    2025250    183200   21.6600  143.1500      12.0        93       935        95
VIS    2025250    183200   21.6700  143.1100      12.2        90       936        94
VIS    2025250    183200   21.6600  143.0900      11.5        89       935        98
VIS    2025250    183200   21.6700  143.0800      11.5        88       936        99
VIS    2025250    183200   21.6700  143.0500      11.5        89       936        99
VIS    2025250    183200   21.6700  143.0300      11.9        87       937        97
VIS    2025250    183200   21.6800  143.0100      12.5        82       940        95
VIS    2025250    183200   21.6700  142.9600      10.3        93       938        96
VIS    2025250    183200   21.6600  142.9500      10.2        97       938        96
VIS    2025250    183200   21.6700  142.9100       9.9        94       939        94
VIS    2025250    183200   21.6700  142.9000      10.0        94       939        95
VIS    2025250    183200   21.6500  142.8800      10.4        90       939        96
VIS    2025250    183200   21.6500  142.8600      10.9        88       937        95
VIS    2025250    183200   21.6600  142.8200      11.2        91       936        95
VIS    2025250    183200   21.6600  142.7900      11.4        93       936        95
VIS    2025250    183200   21.6600  142.7800      11.4        92       937        97
VIS    2025250    183200   21.6600  142.7500      11.1        92       937        97
VIS    2025250    183200   21.6600  142.7100      12.2        92       934        97
VIS    2025250    183200   21.6700  142.6900      12.9        91       935        97
VIS    2025250    183200   21.6700  142.6800      12.8        90       935        97
VIS    2025250    183200   21.6600  142.6400      10.7        91       934        97
VIS    2025250    183200   21.6600  142.6300      10.7        90       934        97
VIS    2025250    183200   21.6600  142.6100      10.8        91       934        99
VIS    2025250    183200   21.6600  142.5800       9.0        81       934        96
VIS    2025250    183200   21.6700  142.5500       9.3        86       934        94
VIS    2025250    183200   21.6600  142.5200      10.3        95       932        98
VIS    2025250    183200   21.6600  142.5100       9.5        96       932        96
VIS    2025250    183200   21.6500  142.4700       8.1        95       932        92
VIS    2025250    183200   21.6500  142.4400       8.9        97       932        92
VIS    2025250    183200   21.7300  150.1000       9.4        89       938        91
VIS    2025250    183200   21.7200  150.0600       9.3        91       914        96
VIS    2025250    183200   21.7300  150.0500       9.4        91       914        97
VIS    2025250    183200   21.7100  150.0200       9.2        89       861        96
VIS    2025250    183200   21.7200  149.9800       9.0        92       854        96
VIS    2025250    183200   21.7100  149.8900       9.5       101       854        94
VIS    2025250    183200   21.7100  149.8600       8.7        99       905        96
VIS    2025250    183200   21.7000  149.8500       8.3        97       914        95
VIS    2025250    183200   21.7000  149.3500       9.7        87       901        94
VIS    2025250    183200   21.7000  149.3400       9.8        88       901        94
VIS    2025250    183200   21.7100  149.3100      10.1        89       919        90
VIS    2025250    183200   21.7100  149.2600      10.3        88       933        90
VIS    2025250    183200   21.7200  149.2400      10.0        87       934        96
VIS    2025250    183200   21.7100  149.2100       9.9        87       926        95
VIS    2025250    183200   21.7200  149.1700      10.1        87       919        94
VIS    2025250    183200   21.7200  149.1600      10.2        86       922        94
VIS    2025250    183200   21.7100  149.1300      10.2        86       922        94
VIS    2025250    183200   21.7000  149.0900      10.3        81       917        94
VIS    2025250    183200   21.6900  149.0600      10.6        81       912        93
VIS    2025250    183200   21.6900  149.0400      10.5        82       901        91
VIS    2025250    183200   21.7100  149.0200      11.0        82       897        90
VIS    2025250    183200   21.6900  149.0000      10.6        81       887        91
VIS    2025250    183200   21.7100  148.9600       8.7        80       877        97
VIS    2025250    183200   21.6900  148.9400       7.6        81       881        97
VIS    2025250    183200   21.7100  148.9300       7.3        79       880        97
VIS    2025250    183200   21.7100  148.8800       7.1        76       924        96
VIS    2025250    183200   21.7100  148.8800       7.2        77       931        95
VIS    2025250    183200   21.6900  148.8300       7.3        71       940        95
VIS    2025250    183200   21.6900  148.8300       7.3        72       931        96
VIS    2025250    183200   21.6900  148.7800       8.2        87       893        96
VIS    2025250    183200   21.6900  148.7800       8.4        87       893        96
VIS    2025250    183200   21.7000  148.7300       8.1        84       894        97
VIS    2025250    183200   21.7000  148.7300       8.0        82       894        96
VIS    2025250    183200   21.7100  148.7000       7.8        76       893        94
VIS    2025250    183200   21.6900  148.6000       7.6        76       962        97
VIS    2025250    183200   21.6900  148.6000       7.6        75       957        97
VIS    2025250    183200   21.7100  148.5700       7.9        72       933        94
VIS    2025250    183200   21.7100  148.5300       8.3        77       911        95
VIS    2025250    183200   21.7000  148.5000       8.5        81       905        98
VIS    2025250    183200   21.7000  148.4900       8.5        81       905        97
VIS    2025250    183200   21.7000  148.4700       8.5        80       900        93
VIS    2025250    183200   21.6900  148.4400       8.7        79       899        94
VIS    2025250    183200   21.7000  148.4000       8.4        76       899        99
VIS    2025250    183200   21.7000  148.4000       8.4        76       899        99
VIS    2025250    183200   21.6900  148.3500       8.9        83       904        97
VIS    2025250    183200   21.7000  148.3400       8.8        83       904        97
VIS    2025250    183200   21.6900  148.3200       8.7        84       897        93
VIS    2025250    183200   21.7000  148.2800       7.7        86       911        90
VIS    2025250    183200   21.7000  148.2700       7.7        84       911        91
VIS    2025250    183200   21.7000  148.2200       8.0        75       928        93
VIS    2025250    183200   21.6800  148.2000       8.8        77       960        94
VIS    2025250    183200   21.6900  148.1700       8.7        78       992        94
VIS    2025250    183200   21.6900  148.1700       8.8        78       992        96
VIS    2025250    183200   21.7000  148.1300       9.2        76       984        92
VIS    2025250    183200   21.6800  148.0000       8.7        81       968        97
VIS    2025250    183200   21.6800  147.9800       9.3        81       974        97
VIS    2025250    183200   21.6800  147.9700       9.1        78       974        95
VIS    2025250    183200   21.7000  147.9400       9.9        75       989        96
VIS    2025250    183200   21.7000  147.9000      10.1        79       968        93
VIS    2025250    183200   21.7000  147.8900       9.9        81       946        94
VIS    2025250    183200   21.7000  147.8500       9.6        85       898        97
VIS    2025250    183200   21.6800  147.8400      10.4        84       898        94
VIS    2025250    183200   21.6800  147.8100       9.5        82       885        93
VIS    2025250    183200   21.6900  147.6400       6.7        80       860        91
VIS    2025250    183200   21.6900  147.4200       9.1        92       854        93
VIS    2025250    183200   21.6800  147.4000      10.3        91       885        97
VIS    2025250    183200   21.6900  147.3700       9.8        86       887        91
VIS    2025250    183200   21.6800  147.3600       9.6        87       892        94
VIS    2025250    183200   21.6800  147.3300       9.1        93       887        92
VIS    2025250    183200   21.6800  147.2900       9.4        99       870        98
VIS    2025250    183200   21.6800  147.2800       9.4       100       870        98
VIS    2025250    183200   21.6900  147.2500       9.9       111       852        95
VIS    2025250    183200   21.6900  147.2300       9.3       114       850        97
VIS    2025250    183200   21.6700  147.2000       9.3       118       777        90
VIS    2025250    183200   21.6800  147.1500      10.4       116       738        90
VIS    2025250    183200   21.6800  147.0900       9.1       101       802        92
VIS    2025250    183200   21.6700  147.0700       7.4        91       848        92
VIS    2025250    183200   21.6600  146.3300      10.2        75       977        96
VIS    2025250    183200   21.6600  146.3100      10.8        76       977        96
VIS    2025250    183200   21.6600  145.6600      15.4        84       941        96
VIS    2025250    183200   21.6600  145.6300      15.4        82       899        92
VIS    2025250    183200   21.6600  145.5600      14.4        85       907        93
VIS    2025250    183200   21.6700  145.5400      15.1        83       932        96
VIS    2025250    183200   21.6700  145.5200      15.7        80       960        96
VIS    2025250    183200   21.6700  145.4800      15.9        74       942        97
VIS    2025250    183200   21.6600  144.2000       9.2       122       719        92
VIS    2025250    183200   21.6600  144.2000       9.0       120       719        91
VIS    2025250    183200   21.6500  144.1300      11.4        90       826        90
VIS    2025250    183200   21.6600  144.0600       9.4       108       838        98
VIS    2025250    183200   21.6600  144.0300       9.0       110       838        91
VIS    2025250    183200   21.6400  144.0000       8.7       104       806        90
VIS    2025250    183200   21.6400  143.8300      11.7        93       873        97
VIS    2025250    183200   21.6400  143.8000      13.2        84       922        96
VIS    2025250    183200   21.6400  143.7800      12.5        85       928        98
VIS    2025250    183200   21.6400  143.7600      11.4        89       928        97
VIS    2025250    183200   21.6500  143.7500      11.4        88       925        97
VIS    2025250    183200   21.6400  143.7200      12.3        92       925        98
VIS    2025250    183200   21.6600  143.6800      13.3        88       932        99
VIS    2025250    183200   21.6600  143.6800      13.3        87       934        99
VIS    2025250    183200   21.6600  143.6300      12.2        88       948        92
VIS    2025250    183200   21.6400  143.5900      11.5        88       934        91
VIS    2025250    183200   21.6500  143.5800      10.9        85       934        95
VIS    2025250    183200   21.6400  143.5400      12.0        84       935        97
VIS    2025250    183200   21.6500  143.5100      12.9        86       937        98
VIS    2025250    183200   21.6500  143.4800      13.2        85       938       100
VIS    2025250    183200   21.6500  143.4700      13.2        85       941        99
VIS    2025250    183200   21.6300  143.4400      12.6        84       948        95
VIS    2025250    183200   21.6400  143.4100      10.9        86       948        95
VIS    2025250    183200   21.6400  143.3800      10.7        88       941        93
VIS    2025250    183200   21.6400  143.3700      10.8        88       939        94
VIS    2025250    183200   21.6400  143.3400      11.0        86       937        94
VIS    2025250    183200   21.6400  143.3200      11.7        89       936        98
VIS    2025250    183200   21.6400  143.2800      12.3        88       936        94
VIS    2025250    183200   21.6500  143.2800      12.2        87       937        94
VIS    2025250    183200   21.6400  143.2500      13.0        84       935        96
VIS    2025250    183200   21.6300  143.1600      10.7        95       934        96
VIS    2025250    183200   21.6500  143.1400      11.7        94       934        93
VIS    2025250    183200   21.6500  143.1200      11.5        96       934        95
VIS    2025250    183200   21.6500  143.0800      11.3        90       935        98
VIS    2025250    183200   21.6500  143.0600      11.5        87       935        98
VIS    2025250    183200   21.6500  143.0400      11.5        87       935        98
VIS    2025250    183200   21.6400  143.0100      11.0        88       935        96
VIS    2025250    183200   21.6300  142.9800      11.3        93       935        98
VIS    2025250    183200   21.6300  142.9800      11.4        94       936        98
VIS    2025250    183200   21.6300  142.9500      10.9        99       937        95
VIS    2025250    183200   21.6400  142.9200       9.9       100       937        92
VIS    2025250    183200   21.6300  142.9000      10.3        99       937        94
VIS    2025250    183200   21.6300  142.8600      11.1        89       936        94
VIS    2025250    183200   21.6400  142.8400      11.8        85       936        95
VIS    2025250    183200   21.6500  142.8100      11.5        90       936        97
VIS    2025250    183200   21.6300  142.7900      11.3        94       936        95
VIS    2025250    183200   21.6400  142.7700      10.7        92       937        94
VIS    2025250    183200   21.6500  142.7500      10.7        91       937        96
VIS    2025250    183200   21.6400  142.7300      10.8        91       934        96
VIS    2025250    183200   21.6300  142.6900      10.7       100       931        96
VIS    2025250    183200   21.6300  142.6800      10.8       100       931        94
VIS    2025250    183200   21.6400  142.6500      10.1        94       933        96
VIS    2025250    183200   21.6400  142.6200      10.5        93       934        99
VIS    2025250    183200   21.6300  142.6100      10.6        94       933        99
VIS    2025250    183200   21.6300  142.5600      11.1        94       932        99
VIS    2025250    183200   21.6300  142.5400      11.8        96       932        99
VIS    2025250    183200   21.6300  142.5300      11.8        94       931        98
VIS    2025250    183200   21.6300  142.5100       9.8        87       931        96
VIS    2025250    183200   21.6400  142.4600       8.1        95       931        90
VIS    2025250    183200   21.7000  150.0600       9.2        90       944        91
VIS    2025250    183200   21.6800  150.0300       9.4        90       861        94
VIS    2025250    183200   21.7000  150.0200       9.2        89       861        95
VIS    2025250    183200   21.6800  150.0000       9.6        91       858        93
VIS    2025250    183200   21.7000  149.9700       9.0        91       845        94
VIS    2025250    183200   21.6900  149.9000       9.6        98       854        92
VIS    2025250    183200   21.6800  149.8900       9.6        99       850        92
VIS    2025250    183200   21.6800  149.8500       8.6        96       838        95
VIS    2025250    183200   21.6800  149.8400       8.5        95       838        95
VIS    2025250    183200   21.6900  149.3900       9.6        89       939        90
VIS    2025250    183200   21.6700  149.3700       9.7        90       931        91
VIS    2025250    183200   21.6900  149.3400       9.8        87       901        95
VIS    2025250    183200   21.6900  149.3300       9.9        87       901        94
VIS    2025250    183200   21.6900  149.1300      10.3        86       917        94
VIS    2025250    183200   21.6800  149.1200      10.0        84       911        94
VIS    2025250    183200   21.6900  149.0800      10.3        81       917        94
VIS    2025250    183200   21.6700  149.0600      10.4        81       917        94
VIS    2025250    183200   21.6700  149.0400      10.3        81       897        93
VIS    2025250    183200   21.6700  149.0200      10.4        81       895        91
VIS    2025250    183200   21.6900  149.0000      10.6        81       887        90
VIS    2025250    183200   21.6700  148.9500       8.3        85       884        97
VIS    2025250    183200   21.6900  148.9400       7.7        82       886        98
VIS    2025250    183200   21.6900  148.9200       7.2        81       895        96
VIS    2025250    183200   21.6800  148.8900       7.3        78       910        93
VIS    2025250    183200   21.6800  148.8700       7.3        77       924        93
VIS    2025250    183200   21.6900  148.8300       7.2        74       931        97
VIS    2025250    183200   21.6800  148.8100       7.6        80       904        99
VIS    2025250    183200   21.6800  148.7800       8.5        87       893        96
VIS    2025250    183200   21.6800  148.7700       8.7        86       894        96
VIS    2025250    183200   21.6600  148.7300       8.5        81       899        97
VIS    2025250    183200   21.6800  148.7100       7.9        75       894        96
VIS    2025250    183200   21.6700  148.6900       7.8        70       896        92
VIS    2025250    183200   21.6700  148.6200       7.9        76       977        96
VIS    2025250    183200   21.6800  148.6100       7.6        76       962        98
VIS    2025250    183200   21.6700  148.5800       7.9        79       914        96
VIS    2025250    183200   21.6700  148.5500       8.6        80       908        96
VIS    2025250    183200   21.6800  148.5400       8.8        80       910        95
VIS    2025250    183200   21.6600  148.4900       8.6        80       904        91
VIS    2025250    183200   21.6600  148.4400       9.2        78       901        94
VIS    2025250    183200   21.6600  148.4200       9.3        79       901        99
VIS    2025250    183200   21.6700  148.3900       9.1        81       913        98
VIS    2025250    183200   21.6600  148.3700       9.2        84       912        96
VIS    2025250    183200   21.6700  148.3600       9.0        85       909        94
VIS    2025250    183200   21.6800  148.3300       8.9        84       897        93
VIS    2025250    183200   21.6600  148.3000       8.8        85       897        97
VIS    2025250    183200   21.6700  148.2700       8.1        88       903        96
VIS    2025250    183200   21.6600  148.2500       8.1        84       903        94
VIS    2025250    183200   21.6800  148.2300       8.3        78       936        92
VIS    2025250    183200   21.6700  148.2000       8.7        77       960        95
VIS    2025250    183200   21.6700  148.1900       8.8        78       960        94
VIS    2025250    183200   21.6800  148.1500       8.8        77       964        95
VIS    2025250    183200   21.6600  148.1300       9.2        75       943        95
VIS    2025250    183200   21.6600  148.1100       9.4        77       976        98
VIS    2025250    183200   21.6500  148.0600       8.4        80       963        97
VIS    2025250    183200   21.6500  148.0500       8.3        79       934        97
VIS    2025250    183200   21.6600  148.0200       8.2        81       943        96
VIS    2025250    183200   21.6700  148.0100       8.4        80       943        97
VIS    2025250    183200   21.6700  147.9400       8.4        74       980        91
VIS    2025250    183200   21.6500  147.8900       8.5        86       973        90
VIS    2025250    183200   21.6700  147.8700       9.8        81       985        91
VIS    2025250    183200   21.6700  147.8400      10.4        84       929        96
VIS    2025250    183200   21.6700  147.8300      10.3        83       929        97
VIS    2025250    183200   21.6600  147.7400       6.8        94       855        91
VIS    2025250    183200   21.6700  147.6900       7.0       107       842        91
VIS    2025250    183200   21.6700  147.6700       6.4        94       855        93
VIS    2025250    183200   21.6600  147.4600       7.8       104       744        90
VIS    2025250    183200   21.6600  147.4400       8.8       100       831        99
VIS    2025250    183200   21.6500  147.4100      10.2        95       886        98
VIS    2025250    183200   21.6500  147.3900      10.5        94       887        99
VIS    2025250    183200   21.6500  147.3700      10.0        93       900        97
VIS    2025250    183200   21.6500  147.3500       8.9        92       906        94
VIS    2025250    183200   21.6500  147.3200       8.3        99       910        90
VIS    2025250    183200   21.6700  147.2900       9.2       100       872        97
VIS    2025250    183200   21.6700  147.2600       8.5       100       873        91
VIS    2025250    183200   21.6400  147.2200       8.9        97       849        94
VIS    2025250    183200   21.6400  147.1700       9.7       115       775        95
VIS    2025250    183200   21.6600  147.1300       9.8       110       758        97
VIS    2025250    183200   21.6600  147.1100       9.3       107       770        97
VIS    2025250    183200   21.6600  147.1000       9.3       105       802        95
VIS    2025250    183200   21.6600  147.0600       7.3        93       842        92
VIS    2025250    183200   21.6400  146.9700       9.3        95       924        92
VIS    2025250    183200   21.6300  146.3100      12.1        75       969        91
VIS    2025250    183200   21.6400  145.6600      15.3        85       944        95
VIS    2025250    183200   21.6500  145.6300      15.0        82       899        91
VIS    2025250    183200   21.6400  145.5300      12.2       101       867        98
VIS    2025250    183200   21.6200  144.6600      12.9        88       917        97
VIS    2025250    183200   21.6400  144.6200      11.0        93       838        91
VIS    2025250    183200   21.6100  144.2300      10.0        97       868        97
VIS    2025250    183200   21.6100  144.2000      10.3       115       801        99
VIS    2025250    183200   21.6200  144.1700       9.4       109       813        91
VIS    2025250    183200   21.6100  144.0700      11.9        86       888        92
VIS    2025250    183200   21.6100  144.0700      12.1        86       886        91
VIS    2025250    183200   21.6100  144.0300      10.8        83       856        90
VIS    2025250    183200   21.6200  144.0200      10.1        86       845        90
VIS    2025250    183200   21.6200  143.8500      12.1        95       873        97
VIS    2025250    183200   21.6300  143.8400      11.8        94       873        97
VIS    2025250    183200   21.6300  143.8100      13.5        83       924        97
VIS    2025250    183200   21.6300  143.7800      12.8        83       928        96
VIS    2025250    183200   21.6300  143.7600      11.8        88       928        97
VIS    2025250    183200   21.6300  143.7500      11.5        91       928        97
VIS    2025250    183200   21.6300  143.7000      12.1        94       928        99
VIS    2025250    183200   21.6300  143.7000      12.5        91       929        99
VIS    2025250    183200   21.6100  143.6700      12.8        89       937        99
VIS    2025250    183200   21.6200  143.6400      13.0        89       935        97
VIS    2025250    183200   21.6100  143.6000      12.5        91       934        96
VIS    2025250    183200   21.6200  143.6000      12.3        91       934        95
VIS    2025250    183200   21.6100  143.5700      11.9        89       933        99
VIS    2025250    183200   21.6300  143.5300      12.5        84       935        97
VIS    2025250    183200   21.6100  143.5100      12.6        85       933        98
VIS    2025250    183200   21.6200  143.4800      12.0        86       936        99
VIS    2025250    183200   21.6100  143.4700      12.1        85       936        99
VIS    2025250    183200   21.6300  143.4500      12.7        82       944        95
VIS    2025250    183200   21.6200  143.4100      12.5        85       944        96
VIS    2025250    183200   21.6100  143.4000      12.5        87       937        98
VIS    2025250    183200   21.6200  143.3600      11.2        90       936        95
VIS    2025250    183200   21.6200  143.3500      11.2        89       936        95
VIS    2025250    183200   21.6100  143.3100      12.5        89       936        99
VIS    2025250    183200   21.6200  143.2900      12.5        89       936        96
VIS    2025250    183200   21.6300  143.2700      12.3        89       936        94
VIS    2025250    183200   21.6200  143.2400      12.8        85       934        93
VIS    2025250    183200   21.6300  143.2300      13.1        84       934        90
VIS    2025250    183200   21.6100  143.2000      11.7        88       934        92
VIS    2025250    183200   21.6300  143.1600      10.6        94       934        96
VIS    2025250    183200   21.6100  143.1400      12.2        91       933       100
VIS    2025250    183200   21.6200  143.1100      12.0        93       934        98
VIS    2025250    183200   21.6100  143.0700      11.7        91       933        92
VIS    2025250    183200   21.6100  143.0400      10.9        91       934        94
VIS    2025250    183200   21.6200  143.0200      10.6        92       934        96
VIS    2025250    183200   21.6300  142.9800      11.4        94       935        98
VIS    2025250    183200   21.6300  142.9800      11.5        94       935        98
VIS    2025250    183200   21.6200  142.9400      10.9       103       937        94
VIS    2025250    183200   21.6000  142.9300      10.7       106       935        92
VIS    2025250    183200   21.6200  142.9000      10.6        99       937        94
VIS    2025250    183200   21.6200  142.8600      11.0        89       936        94
VIS    2025250    183200   21.6000  142.8300      12.4        87       934        99
VIS    2025250    183200   21.6000  142.8200      13.0        87       935        99
VIS    2025250    183200   21.6200  142.7900      11.7        94       936        96
VIS    2025250    183200   21.6100  142.7800      10.3        95       935        91
VIS    2025250    183200   21.6000  142.7400      10.3        92       931        95
VIS    2025250    183200   21.6100  142.7100      11.6        94       930        95
VIS    2025250    183200   21.6100  142.7100      11.5        96       930        96
VIS    2025250    183200   21.6000  142.6800      11.0        95       928        97
VIS    2025250    183200   21.6000  142.6400       9.1        98       930        96
VIS    2025250    183200   21.6200  142.6200      10.2        96       933        98
VIS    2025250    183200   21.6200  142.5900      11.2        94       933        99
VIS    2025250    183200   21.6100  142.5600      11.9        96       932        98
VIS    2025250    183200   21.6200  142.5600      11.6        96       932        98
VIS    2025250    183200   21.6100  142.5300      11.4        93       931        96
VIS    2025250    183200   21.6100  142.4900       8.9        93       930        91
VIS    2025250    183200   21.6000  142.4200       8.3       104       930        92
VIS    2025250    183200   21.6100  142.4100       8.6       102       930        92
VIS    2025250    183200   21.6900  151.9100       5.4        74       963        91
VIS    2025250    183200   21.6600  150.0400       9.2        91       922        93
VIS    2025250    183200   21.6700  150.0300       9.5        90       881        96
VIS    2025250    183200   21.6700  149.9900       9.6        91       884        95
VIS    2025250    183200   21.6700  149.9900       9.5        91       905        96
VIS    2025250    183200   21.6700  149.9600       9.0        88       896        98
VIS    2025250    183200   21.6700  149.9300       8.9        89       896        97
VIS    2025250    183200   21.6600  149.9000       9.3        94       866        92
VIS    2025250    183200   21.6700  149.8400       8.4        94       838        95
VIS    2025250    183200   21.6600  149.8200       8.2        95       906        98
VIS    2025250    183200   21.6500  149.8100       8.2        94       949        92
VIS    2025250    183200   21.6500  149.3600      10.3        90       908        92
VIS    2025250    183200   21.6700  149.3400      10.0        89       908        93
VIS    2025250    183200   21.6600  149.1100      10.1        84       909        93
VIS    2025250    183200   21.6600  149.0800      10.2        82       917        94
VIS    2025250    183200   21.6500  149.0400      10.9        80       897        90
VIS    2025250    183200   21.6500  149.0100      10.4        80       878        92
VIS    2025250    183200   21.6500  148.9900       9.5        81       876        95
VIS    2025250    183200   21.6600  148.9600       8.7        84       881        96
VIS    2025250    183200   21.6500  148.9500       8.2        84       886        96
VIS    2025250    183200   21.6400  148.9200       8.0        82       904        92
VIS    2025250    183200   21.6600  148.8900       7.7        76       908        90
VIS    2025250    183200   21.6400  148.8500       7.3        78       943        97
VIS    2025250    183200   21.6500  148.8300       7.1        83       916        96
VIS    2025250    183200   21.6500  148.8100       7.5        86       893        94
VIS    2025250    183200   21.6400  148.7900       7.8        84       889        94
VIS    2025250    183200   21.6500  148.7600       8.9        82       899        96
VIS    2025250    183200   21.6400  148.7300       8.8        78       910        98
VIS    2025250    183200   21.6500  148.7200       8.4        76       906        98
VIS    2025250    183200   21.6500  148.6700       8.0        72       915        93
VIS    2025250    183200   21.6400  148.6200       7.8        81       942        93
VIS    2025250    183200   21.6500  148.6000       7.6        79       926        94
VIS    2025250    183200   21.6600  148.5800       8.0        80       910        96
VIS    2025250    183200   21.6600  148.5500       8.7        81       905        96
VIS    2025250    183200   21.6500  148.5200       8.7        77       906        97
VIS    2025250    183200   21.6500  148.4900       8.5        76       904        91
VIS    2025250    183200   21.6300  148.4500       9.3        74       904        94
VIS    2025250    183200   21.6300  148.4400       9.4        76       905        98
VIS    2025250    183200   21.6300  148.4000       9.3        81       924        98
VIS    2025250    183200   21.6400  148.3700       9.5        82       924        97
VIS    2025250    183200   21.6400  148.3600       9.4        82       904        97
VIS    2025250    183200   21.6300  148.3300       9.1        84       895        98
VIS    2025250    183200   21.6300  148.2900       8.6        85       897        99
VIS    2025250    183200   21.6500  148.2700       8.4        85       899        99
VIS    2025250    183200   21.6500  148.2600       8.2        84       903        96
VIS    2025250    183200   21.6300  148.2300       7.8        78       936        93
VIS    2025250    183200   21.6500  148.1900       8.4        77       929        95
VIS    2025250    183200   21.6500  148.1900       8.7        77       929        93
VIS    2025250    183200   21.6500  148.1400       9.2        75       929        95
VIS    2025250    183200   21.6500  148.1100       9.4        78       943        99
VIS    2025250    183200   21.6300  148.0900       8.7        80       906        99
VIS    2025250    183200   21.6400  148.0700       8.4        79       934        98
VIS    2025250    183200   21.6300  148.0400       8.4        78       893        90
VIS    2025250    183200   21.6300  147.9100       8.4        99       978        90
VIS    2025250    183200   21.6300  147.8900       8.8        98       973        92
VIS    2025250    183200   21.6300  147.8600       8.7        85       968        93
VIS    2025250    183200   21.6300  147.8500       9.2        84       955        94
VIS    2025250    183200   21.6400  147.8200       9.9        84       928        96
VIS    2025250    183200   21.6300  147.8000       9.2        83       883        91
VIS    2025250    183200   21.6300  147.7400       6.7        97       869        94
VIS    2025250    183200   21.6400  147.7300       7.0        97       854        94
VIS    2025250    183200   21.6200  147.7000       7.2        96       837        93
VIS    2025250    183200   21.6200  147.4600       8.3        98       747        95
VIS    2025250    183200   21.6200  147.4400       9.3        95       873        95
VIS    2025250    183200   21.6300  147.4100      10.1        94       886        98
VIS    2025250    183200   21.6400  147.4000      10.3        94       887        98
VIS    2025250    183200   21.6400  147.3600       9.1        94       908        95
VIS    2025250    183200   21.6400  147.3500       8.7        95       911        93
VIS    2025250    183200   21.6300  147.2900       8.2        95       922        94
VIS    2025250    183200   21.6200  147.2200       9.5        92       890        96
VIS    2025250    183200   21.6200  147.1900      10.3       102       875        98
VIS    2025250    183200   21.6200  147.1700       8.7       108       842        96
VIS    2025250    183200   21.6200  147.0900       9.3       108       824        94
VIS    2025250    183200   21.6200  147.0600       8.0        99       858        90
VIS    2025250    183200   21.6200  147.0000       8.9        97       933        91
VIS    2025250    183200   21.6200  147.0000       9.0        97       894        95
VIS    2025250    183200   21.6200  146.9500       9.4        88       894        96
VIS    2025250    183200   21.6200  146.9400       9.5        85       935        94
VIS    2025250    183200   21.6200  146.9200      10.1        88       974        95
VIS    2025250    183200   21.6200  146.9000      10.8        92       980        92
VIS    2025250    183200   21.6100  146.8600       8.7        96       980        91
VIS    2025250    183200   21.6200  146.8000       9.3        84       971        90
VIS    2025250    183200   21.6100  146.3300      12.9        76       963        90
VIS    2025250    183200   21.6200  146.3100      12.1        77       958        94
VIS    2025250    183200   21.6300  146.3000      12.1        77       958        95
VIS    2025250    183200   21.5900  144.7100      15.4        81       916        96
VIS    2025250    183200   21.5900  144.6800      14.4        81       921        97
VIS    2025250    183200   21.6100  144.6600      13.2        85       918        97
VIS    2025250    183200   21.6000  144.6400      10.9        89       916        97
VIS    2025250    183200   21.6000  144.6300      11.2        89       914        99
VIS    2025250    183200   21.6100  144.6000      10.8        98       864        97
VIS    2025250    183200   21.5900  144.4400       9.9       108       786        94
VIS    2025250    183200   21.6000  144.4300       9.3       114       786        95
VIS    2025250    183200   21.6100  144.4000       8.3       118       765        95
VIS    2025250    183200   21.5900  144.3300       9.6       109       780        94
VIS    2025250    183200   21.5900  144.2600      10.8       101       870        96
VIS    2025250    183200   21.6000  144.2400      10.7        94       870        93
VIS    2025250    183200   21.6000  144.2300      10.9        98       868        98
VIS    2025250    183200   21.6100  144.2000      10.1       113       824        99
VIS    2025250    183200   21.6100  144.0700      11.5        87       886        91
VIS    2025250    183200   21.6100  144.0300      11.1        84       872        91
VIS    2025250    183200   21.5900  143.9900      12.3        90       843        90
VIS    2025250    183200   21.5900  143.9700      11.3        91       841        91
VIS    2025250    183200   21.5900  143.8700      12.8        88       867        92
VIS    2025250    183200   21.6000  143.8500      13.2        86       913        99
VIS    2025250    183200   21.6000  143.8200      14.0        82       928        98
VIS    2025250    183200   21.6000  143.8100      14.2        81       928        98
VIS    2025250    183200   21.5900  143.7700      12.1        90       930        96
VIS    2025250    183200   21.5800  143.7400      11.4        95       930        94
VIS    2025250    183200   21.6000  143.7100      11.7        98       930        96
VIS    2025250    183200   21.5900  143.6900      12.0        97       932        97
VIS    2025250    183200   21.6000  143.6800      12.3        95       933        97
VIS    2025250    183200   21.5900  143.6600      12.6        92       931        98
VIS    2025250    183200   21.5900  143.6200      12.9        91       932        97
VIS    2025250    183200   21.6000  143.6100      12.7        92       932        98
VIS    2025250    183200   21.5800  143.5700      11.2        94       933        96
VIS    2025250    183200   21.5800  143.5500      11.6        89       933        99
VIS    2025250    183200   21.6000  143.5200      12.7        83       933        99
VIS    2025250    183200   21.5900  143.4900      12.6        85       933        99
VIS    2025250    183200   21.5900  143.4800      12.5        85       933        99
VIS    2025250    183200   21.5800  143.4500      12.1        85       929        97
VIS    2025250    183200   21.5900  143.4100      12.6        87       935        99
VIS    2025250    183200   21.5800  143.4000      12.7        90       935        99
VIS    2025250    183200   21.5800  143.3700      12.6        89       939        96
VIS    2025250    183200   21.5800  143.3500      12.2        90       939        91
VIS    2025250    183200   21.5900  143.3100      12.5        88       938        99
VIS    2025250    183200   21.5900  143.2700      11.6        91       936        96
VIS    2025250    183200   21.5900  143.2600      11.1        93       935        96
VIS    2025250    183200   21.5800  143.2200      10.9        94       934        98
VIS    2025250    183200   21.6000  143.1900      11.8        87       934        99
VIS    2025250    183200   21.5800  143.1700      12.8        84       933        99
VIS    2025250    183200   21.6000  143.1500      11.5        95       933        92
VIS    2025250    183200   21.5800  143.1400      12.8        89       934        99
VIS    2025250    183200   21.5800  143.0700      11.6        91       935        92
VIS    2025250    183200   21.5800  143.0600      11.5        92       934        92
VIS    2025250    183200   21.5800  143.0200      11.4       100       936        92
VIS    2025250    183200   21.5800  143.0100      11.8       101       936        92
VIS    2025250    183200   21.5800  142.9700      11.2       105       935        95
VIS    2025250    183200   21.5800  142.9600      10.9       104       935        95
VIS    2025250    183200   21.5800  142.9300      10.2       104       934        91
VIS    2025250    183200   21.5800  142.9100      10.2       101       934        92
VIS    2025250    183200   21.5800  142.8700      10.4       103       934        90
VIS    2025250    183200   21.6000  142.8400      11.6        89       934        99
VIS    2025250    183200   21.5900  142.8400      11.1        93       934        96
VIS    2025250    183200   21.5900  142.8000      11.5        95       933        98
VIS    2025250    183200   21.6000  142.7900      11.3        96       933        96
VIS    2025250    183200   21.5900  142.7500      10.2        93       932        91
VIS    2025250    183200   21.5800  142.7300      11.7        91       929        99
VIS    2025250    183200   21.6000  142.7200      11.7        93       928        96
VIS    2025250    183200   21.6000  142.6900      11.8        94       928        96
VIS    2025250    183200   21.6000  142.6500       9.6        96       929        98
VIS    2025250    183200   21.6000  142.6400       9.0        98       929        96
VIS    2025250    183200   21.5900  142.6100      10.1        96       929        97
VIS    2025250    183200   21.6000  142.5800      12.6        94       932        97
VIS    2025250    183200   21.6000  142.5500      12.0        97       931        95
VIS    2025250    183200   21.6000  142.5400      11.9        97       931        95
VIS    2025250    183200   21.5900  142.5000      10.0        98       930        95
VIS    2025250    183200   21.5900  142.4800       9.0        99       930        93
VIS    2025250    183200   21.5800  142.4500       8.2       100       931        91
VIS    2025250    183200   21.5800  142.4400       8.2        99       931        91
VIS    2025250    183200   21.5800  142.4000       8.6       104       930        92
VIS    2025250    183200   21.5900  142.3900       8.9        99       930        93
VIS    2025250    183200   21.6700  151.9300       4.7        79       986        96
VIS    2025250    183200   21.6600  151.9000       5.0        76       963        98
VIS    2025250    183200   21.6700  151.8900       5.3        75       963        96
VIS    2025250    183200   21.6500  150.0200       9.5        92       919        93
VIS    2025250    183200   21.6400  149.9700       8.9        88       923        97
VIS    2025250    183200   21.6500  149.9500       8.9        87       914        98
VIS    2025250    183200   21.6300  149.9300       8.8        86       914        98
VIS    2025250    183200   21.6300  149.8900       9.0        89       913        96
VIS    2025250    183200   21.6300  149.0800      10.8        85       918        91
VIS    2025250    183200   21.6200  149.0600      11.1        83       918        91
VIS    2025250    183200   21.6200  149.0000      10.4        79       888        92
VIS    2025250    183200   21.6300  148.9700       8.8        80       881        96
VIS    2025250    183200   21.6200  148.9300       8.3        81       890        94
VIS    2025250    183200   21.6400  148.9200       8.0        82       904        92
VIS    2025250    183200   21.6200  148.8900       8.3        74       942        95
VIS    2025250    183200   21.6300  148.8500       7.5        76       943        97
VIS    2025250    183200   21.6300  148.8400       7.5        79       942        97
VIS    2025250    183200   21.6200  148.8200       7.3        81       910        90
VIS    2025250    183200   21.6300  148.7800       8.4        83       889        95
VIS    2025250    183200   21.6300  148.7500       9.1        81       899        96
VIS    2025250    183200   21.6200  148.7400       9.2        81       910       100
VIS    2025250    183200   21.6200  148.7000       8.9        77       916        99
VIS    2025250    183200   21.6100  148.6800       8.4        78       916        99
VIS    2025250    183200   21.6100  148.6600       7.9        79       917        96
VIS    2025250    183200   21.6300  148.6200       7.9        82       931        91
VIS    2025250    183200   21.6300  148.5800       7.8        81       902        95
VIS    2025250    183200   21.6300  148.5700       8.2        81       901        98
VIS    2025250    183200   21.6100  148.5200       8.4        73       910        94
VIS    2025250    183200   21.6200  148.5000       8.4        72       910        92
VIS    2025250    183200   21.6300  148.4900       8.4        73       909        90
VIS    2025250    183200   21.6300  148.4500       9.2        73       905        95
VIS    2025250    183200   21.6100  148.4300       8.4        75       918        96
VIS    2025250    183200   21.6300  148.4000       9.3        81       932        98
VIS    2025250    183200   21.6100  148.3700       9.5        87       933        97
VIS    2025250    183200   21.6200  148.3600       9.5        84       905        98
VIS    2025250    183200   21.6200  148.3400       9.3        84       897        99
VIS    2025250    183200   21.6100  148.2900       8.8        82       896        97
VIS    2025250    183200   21.6100  148.2700       9.1        79       897        98
VIS    2025250    183200   21.6200  148.2500       8.6        80       909        98
VIS    2025250    183200   21.6100  148.2400       8.7        79       914        97
VIS    2025250    183200   21.6100  148.2000       8.4        79       902        99
VIS    2025250    183200   21.6100  148.1700       8.0        77       895        97
VIS    2025250    183200   21.6000  148.1400       7.9        76       889        96
VIS    2025250    183200   21.6000  148.1400       8.0        76       889        96
VIS    2025250    183200   21.6100  148.0900       9.1        79       892        95
VIS    2025250    183200   21.6100  148.0900       9.1        79       892        96
VIS    2025250    183200   21.6000  147.8900       9.1        98       960        92
VIS    2025250    183200   21.6000  147.8700       9.1        84       959        97
VIS    2025250    183200   21.6200  147.8400       9.3        84       942        96
VIS    2025250    183200   21.6200  147.8200       9.5        84       901        94
VIS    2025250    183200   21.6200  147.8100       9.5        83       883        93
VIS    2025250    183200   21.6200  147.7800       8.2        84       883        93
VIS    2025250    183200   21.6100  147.7400       7.0        95       839        93
VIS    2025250    183200   21.6000  147.5000       7.5       115       703        92
VIS    2025250    183200   21.6000  147.4600       8.6       101       768        96
VIS    2025250    183200   21.6100  147.4500       8.8        99       782        96
VIS    2025250    183200   21.6000  147.4300       9.4       101       872        90
VIS    2025250    183200   21.6100  147.3900       9.6        94       886        98
VIS    2025250    183200   21.6100  147.3600       9.1        96       906        95
VIS    2025250    183200   21.6100  147.3500       8.9        97       911        94
VIS    2025250    183200   21.5900  147.3200       7.8       100       870        97
VIS    2025250    183200   21.6000  147.2800       8.1        88       887        95
VIS    2025250    183200   21.6100  147.2700       8.4        87       915        91
VIS    2025250    183200   21.6100  147.2300       9.7        93       915        92
VIS    2025250    183200   21.5900  147.2300      10.3        95       931        90
VIS    2025250    183200   21.6100  147.2000      10.4       100       875        99
VIS    2025250    183200   21.6000  147.0200       8.8        87       894        96
VIS    2025250    183200   21.6100  147.0000       8.9        95       894        95
VIS    2025250    183200   21.6100  146.9600       9.6        88       894        97
VIS    2025250    183200   21.6100  146.9500       9.4        86       894        97
VIS    2025250    183200   21.6000  146.9100       9.2        89       973        93
VIS    2025250    183200   21.6100  146.9000       9.1        90       980        93
VIS    2025250    183200   21.6100  146.8600       8.8        96       980        90
VIS    2025250    183200   21.5900  146.8300       9.2        96       913        94
VIS    2025250    183200   21.5900  146.8200       9.1        94       913        94
VIS    2025250    183200   21.5900  146.7800       8.5        91       892        94
VIS    2025250    183200   21.5900  146.7700       8.5        92       892        95
VIS    2025250    183200   21.5800  144.7200      14.9        82       905        96
VIS    2025250    183200   21.5700  144.6900      15.0        83       921        98
VIS    2025250    183200   21.5800  144.6800      15.0        82       921        97
VIS    2025250    183200   21.5800  144.6600      13.1        84       917        97
VIS    2025250    183200   21.5700  144.6200      11.3        86       912        98
VIS    2025250    183200   21.5900  144.6100      11.8        90       911        98
VIS    2025250    183200   21.5900  144.5100      10.1        93       770        90
VIS    2025250    183200   21.5900  144.4600      10.3       100       779        90
VIS    2025250    183200   21.5900  144.4400       9.5       114       781        97
VIS    2025250    183200   21.5700  144.3400       9.4       106       776        95
VIS    2025250    183200   21.5800  144.3200      10.8       102       781        92
VIS    2025250    183200   21.5600  144.2900      12.0        91       855        92
VIS    2025250    183200   21.5600  144.2800      11.2        98       875        98
VIS    2025250    183200   21.5700  144.2500      10.5       106       879        93
VIS    2025250    183200   21.5800  144.2200      10.7       104       849        96
VIS    2025250    183200   21.5800  144.2100      10.2       105       849        98
VIS    2025250    183200   21.5800  144.0400      10.9        94       838        90
VIS    2025250    183200   21.5600  143.9900      12.2        92       841        90
VIS    2025250    183200   21.5600  143.9500      11.8        86       870        93
VIS    2025250    183200   21.5700  143.9200      10.9        94       865        95
VIS    2025250    183200   21.5600  143.9000      12.4        93       865        93
VIS    2025250    183200   21.5700  143.8800      12.8        91       867        90
VIS    2025250    183200   21.5700  143.8600      13.2        86       913        97
VIS    2025250    183200   21.5700  143.8300      13.7        82       928        99
VIS    2025250    183200   21.5700  143.8000      12.7        85       929        96
VIS    2025250    183200   21.5800  143.7700      12.3        90       931        96
VIS    2025250    183200   21.5800  143.7500      11.4        95       930        94
VIS    2025250    183200   21.5700  143.7300      11.5        95       929        96
VIS    2025250    183200   21.5600  143.6900      12.1        94       928        97
VIS    2025250    183200   21.5600  143.6700      12.5        91       929        99
VIS    2025250    183200   21.5700  143.6600      12.9        89       929        99
VIS    2025250    183200   21.5700  143.6400      13.2        88       928        98
VIS    2025250    183200   21.5600  143.6000      11.4        99       930        97
VIS    2025250    183200   21.5600  143.5900      11.3        99       930        96
VIS    2025250    183200   21.5600  143.5500      12.0        93       931        98
VIS    2025250    183200   21.5700  143.5200      13.2        84       932        99
VIS    2025250    183200   21.5700  143.5200      13.3        83       933        99
VIS    2025250    183200   21.5700  143.4800      12.3        87       927        96
VIS    2025250    183200   21.5600  143.4600      11.8        90       925        96
VIS    2025250    183200   21.5600  143.4400      11.6        92       926        98
VIS    2025250    183200   21.5700  143.4000      12.2        92       932        98
VIS    2025250    183200   21.5700  143.3800      12.7        89       939        97
VIS    2025250    183200   21.5800  143.3600      12.3        90       945        94
VIS    2025250    183200   21.5800  143.3200      12.3        88       943        95
VIS    2025250    183200   21.5800  143.3200      12.4        87       941        97
VIS    2025250    183200   21.5600  143.2900      12.4        86       937        98
VIS    2025250    183200   21.5800  143.2700      11.3        91       936        95
VIS    2025250    183200   21.5600  143.2200      11.6        93       935        98
VIS    2025250    183200   21.5600  143.2000      11.8        92       934        99
VIS    2025250    183200   21.5600  143.1800      12.5        90       934        99
VIS    2025250    183200   21.5700  143.1600      13.1        88       933        99
VIS    2025250    183200   21.5600  143.1300      12.0        94       935        97
VIS    2025250    183200   21.5700  143.1200      12.2        90       934        98
VIS    2025250    183200   21.5500  143.0800      11.5        90       935        97
VIS    2025250    183200   21.5600  143.0600      11.0        92       936        95
VIS    2025250    183200   21.5700  143.0500      10.9        92       936        94
VIS    2025250    183200   21.5700  143.0200      11.3       100       936        92
VIS    2025250    183200   21.5700  142.9800      11.3       105       935        95
VIS    2025250    183200   21.5600  142.9600      10.6       103       933        95
VIS    2025250    183200   21.5500  142.9500      10.2        99       933        95
VIS    2025250    183200   21.5500  142.9200       9.7        94       934        97
VIS    2025250    183200   21.5600  142.8900      10.1       105       934        93
VIS    2025250    183200   21.5500  142.8400      10.9        98       934        92
VIS    2025250    183200   21.5700  142.8100      11.5        96       933        97
VIS    2025250    183200   21.5600  142.8000      10.9       101       932        95
VIS    2025250    183200   21.5500  142.7500      11.7        93       932        96
VIS    2025250    183200   21.5500  142.7300      12.8        90       927        97
VIS    2025250    183200   21.5600  142.7100      12.4        92       927        98
VIS    2025250    183200   21.5600  142.7000      12.5        92       927        99
VIS    2025250    183200   21.5600  142.6600      11.0        94       925        99
VIS    2025250    183200   21.5600  142.6300      10.2       100       926        93
VIS    2025250    183200   21.5700  142.6100       9.9        98       928        93
VIS    2025250    183200   21.5700  142.6000      10.5        97       928        93
VIS    2025250    183200   21.5600  142.5800      11.4        97       928        95
VIS    2025250    183200   21.5700  142.5300      10.8        96       931        97
VIS    2025250    183200   21.5500  142.5100       9.8        97       930        98
VIS    2025250    183200   21.5500  142.5000       9.5        99       930        97
VIS    2025250    183200   21.5600  142.4700       8.7       103       930        94
VIS    2025250    183200   21.5700  142.4300       8.4       102       931        94
VIS    2025250    183200   21.5600  142.4300       8.5       102       932        93
VIS    2025250    183200   21.5700  142.4000       8.5       103       930        92
VIS    2025250    183200   21.6400  151.9500       4.9        79       986        99
VIS    2025250    183200   21.6500  151.9200       5.1        79       963        99
VIS    2025250    183200   21.6500  151.9200       5.1        81       963        98
VIS    2025250    183200   21.6300  151.8700       5.4        81       920        95
VIS    2025250    183200   21.6100  149.9800       8.8        89       944        92
VIS    2025250    183200   21.6200  149.9600       8.8        86       923        98
VIS    2025250    183200   21.6200  149.9200       8.7        84       913        98
VIS    2025250    183200   21.6000  149.8900       8.9        84       872        94
VIS    2025250    183200   21.5900  149.2500      10.2        87       907        93
VIS    2025250    183200   21.6000  149.0900      10.7        88       915        92
VIS    2025250    183200   21.5900  149.0700      10.6        84       919        93
VIS    2025250    183200   21.5900  149.0600      10.5        84       919        93
VIS    2025250    183200   21.6000  149.0200      10.8        81       936        94
VIS    2025250    183200   21.6000  149.0100      10.4        81       920        93
VIS    2025250    183200   21.5900  148.9600       8.2        84       884        97
VIS    2025250    183200   21.6000  148.9600       8.1        84       884        98
VIS    2025250    183200   21.6100  148.9200       8.6        79       904        97
VIS    2025250    183200   21.6000  148.9100       8.5        79       908        98
VIS    2025250    183200   21.6000  148.8600       8.4        76       941        97
VIS    2025250    183200   21.6000  148.8500       8.2        77       937        94
VIS    2025250    183200   21.5900  148.8100       7.3        80       910        90
VIS    2025250    183200   21.6000  148.7700       8.4        84       890        95
VIS    2025250    183200   21.5900  148.7400       9.4        82       907        97
VIS    2025250    183200   21.5900  148.7200       9.2        81       908        99
VIS    2025250    183200   21.6100  148.6900       8.7        79       916       100
VIS    2025250    183200   21.6100  148.6800       8.4        79       916        99
VIS    2025250    183200   21.5900  148.6500       7.6        78       917        93
VIS    2025250    183200   21.5900  148.5800       8.1        81       901        97
VIS    2025250    183200   21.5900  148.5600       8.1        77       905        99
VIS    2025250    183200   21.5900  148.5500       8.2        77       905        98
VIS    2025250    183200   21.5900  148.5100       8.4        71       918        93
VIS    2025250    183200   21.6000  148.5000       8.4        71       917        93
VIS    2025250    183200   21.5900  148.4600       8.4        72       918        95
VIS    2025250    183200   21.6000  148.4300       8.3        74       918        96
VIS    2025250    183200   21.6000  148.4300       8.4        75       918        96
VIS    2025250    183200   21.5900  148.3800       9.6        91       930        93
VIS    2025250    183200   21.6000  148.3800       9.5        88       933        96
VIS    2025250    183200   21.5900  148.3300       9.2        85       897        99
VIS    2025250    183200   21.5800  148.3200       9.1        86       897        99
VIS    2025250    183200   21.6000  148.3000       8.9        82       896        97
VIS    2025250    183200   21.5900  148.2600       8.9        81       897        98
VIS    2025250    183200   21.6000  148.2500       9.0        79       909        98
VIS    2025250    183200   21.6000  148.2100       8.6        79       902        99
VIS    2025250    183200   21.6000  148.2000       8.6        79       897        98
VIS    2025250    183200   21.5900  148.1600       8.0        79       889        97
VIS    2025250    183200   21.5900  148.1300       7.9        78       889        97
VIS    2025250    183200   21.5800  148.1000       8.7        79       889        97
VIS    2025250    183200   21.5900  148.0800       9.3        78       892        94
VIS    2025250    183200   21.5900  147.8800       9.1        84       953        97
VIS    2025250    183200   21.6000  147.8700       9.1        84       958        97
VIS    2025250    183200   21.5800  147.7500       6.8        93       862        94
VIS    2025250    183200   21.5700  147.7400       6.9        84       837        91
VIS    2025250    183200   21.5800  147.5300       7.5       114       745        91
VIS    2025250    183200   21.5800  147.5000       8.1       110       768        93
VIS    2025250    183200   21.5700  147.4900       8.3       109       780        90
VIS    2025250    183200   21.5800  147.4100       9.1       104       777        94
VIS    2025250    183200   21.5700  147.3900       9.3        97       777        95
VIS    2025250    183200   21.5700  147.3500       8.2        94       792        97
VIS    2025250    183200   21.5700  147.3300       8.4        99       823       100
VIS    2025250    183200   21.5700  147.3000       8.6        99       823        99
VIS    2025250    183200   21.5900  147.2800       8.5        92       821        96
VIS    2025250    183200   21.5700  147.2500      10.4        95       915        91
VIS    2025250    183200   21.5900  147.2400      10.3        94       915        91
VIS    2025250    183200   21.5700  147.0700       9.5        86       999        94
VIS    2025250    183200   21.5700  147.0500       9.6        82       995        96
VIS    2025250    183200   21.5700  147.0300       9.6        81       962        96
VIS    2025250    183200   21.5800  146.9900      10.1        87       911        97
VIS    2025250    183200   21.5800  146.9900      10.2        87       894        97
VIS    2025250    183200   21.5600  146.9500      10.3        81       940        95
VIS    2025250    183200   21.5600  146.9300       9.8        80       961        93
VIS    2025250    183200   21.5800  146.8700       8.8        96       937        92
VIS    2025250    183200   21.5700  146.8600       8.9        97       897        94
VIS    2025250    183200   21.5800  146.8300       9.2        96       852        97
VIS    2025250    183200   21.5800  146.8000       8.7        92       841        92
VIS    2025250    183200   21.5600  146.7900       8.2        95       835        93
VIS    2025250    183200   21.5600  146.7500       7.7       102       892        92
VIS    2025250    183200   21.5600  146.7400       7.1       100       899        92
VIS    2025250    183200   21.5600  146.4300       8.9        99       976        90
VIS    2025250    183200   21.5600  144.7400      12.7        87       900        95
VIS    2025250    183200   21.5600  144.7300      13.0        87       905        97
VIS    2025250    183200   21.5500  144.6900      14.9        84       919        97
VIS    2025250    183200   21.5600  144.6600      13.4        84       915        96
VIS    2025250    183200   21.5600  144.6600      13.0        84       914        96
VIS    2025250    183200   21.5600  144.6300      11.5        84       912        96
VIS    2025250    183200   21.5400  144.5800      10.7       126       787        97
VIS    2025250    183200   21.5400  144.3600      10.1       110       771        96
VIS    2025250    183200   21.5400  144.3600      10.4       109       772        96
VIS    2025250    183200   21.5600  144.2900      12.0        91       855        92
VIS    2025250    183200   21.5500  144.2700      11.1        99       875        95
VIS    2025250    183200   21.5500  144.2500      10.3       109       879        93
VIS    2025250    183200   21.5600  144.2400      10.3       112       870        91
VIS    2025250    183200   21.5400  144.1000       9.3       111       769        91
VIS    2025250    183200   21.5400  144.0800       9.9       114       769        94
VIS    2025250    183200   21.5400  144.0500      11.0       111       771        94
VIS    2025250    183200   21.5400  144.0200      10.5       106       771        91
VIS    2025250    183200   21.5500  143.9500      12.2        87       870        91
VIS    2025250    183200   21.5600  143.9400      11.2        90       872        95
VIS    2025250    183200   21.5400  143.9100      13.0        88       887        93
VIS    2025250    183200   21.5400  143.8800      12.5        87       917        95
VIS    2025250    183200   21.5400  143.8400      11.7        86       929        98
VIS    2025250    183200   21.5500  143.8300      12.5        84       929        99
VIS    2025250    183200   21.5500  143.8100      12.4        86       929        96
VIS    2025250    183200   21.5400  143.7900      11.9        92       929        93
VIS    2025250    183200   21.5500  143.7500      12.2        92       930        96
VIS    2025250    183200   21.5300  143.7200      12.7        88       926       100
VIS    2025250    183200   21.5300  143.7100      12.7        88       926       100
VIS    2025250    183200   21.5400  143.6700      12.8        87       927        99
VIS    2025250    183200   21.5500  143.6600      12.8        90       928        99
VIS    2025250    183200   21.5400  143.6200      12.1        94       927        99
VIS    2025250    183200   21.5500  143.6000      11.4       100       930        96
VIS    2025250    183200   21.5500  143.5900      11.3       100       930        96
VIS    2025250    183200   21.5500  143.5500      12.4        92       930        98
VIS    2025250    183200   21.5400  143.5400      12.9        89       930        98
VIS    2025250    183200   21.5300  143.5100      13.5        89       925        97
VIS    2025250    183200   21.5400  143.4900      12.6        89       920        98
VIS    2025250    183200   21.5500  143.4600      11.7        91       922        96
VIS    2025250    183200   21.5300  143.4200      11.7        93       924        95
VIS    2025250    183200   21.5400  143.4100      11.8        92       932        96
VIS    2025250    183200   21.5400  143.3800      12.6        90       945        94
VIS    2025250    183200   21.5400  143.3600      13.0        88       950        98
VIS    2025250    183200   21.5500  143.3300      12.6        85       939        99
VIS    2025250    183200   21.5500  143.3000      12.6        85       937        99
VIS    2025250    183200   21.5500  143.2900      12.4        85       937        99
VIS    2025250    183200   21.5500  143.2500      11.3        92       936        98
VIS    2025250    183200   21.5500  143.2200      11.7        91       935        99
VIS    2025250    183200   21.5500  143.2000      11.8        93       934        98
VIS    2025250    183200   21.5300  143.1700      12.3        93       936        96
VIS    2025250    183200   21.5500  143.1500      12.7        91       936        97
VIS    2025250    183200   21.5300  143.1400      11.9        92       935        97
VIS    2025250    183200   21.5500  143.1100      10.9        95       935        98
VIS    2025250    183200   21.5400  143.0900      10.4        95       935        98
VIS    2025250    183200   21.5300  143.0700      10.9        90       936        98
VIS    2025250    183200   21.5500  143.0400      10.8        92       936        96
VIS    2025250    183200   21.5300  143.0000      10.3        99       934        91
VIS    2025250    183200   21.5300  142.9900      10.6        99       934        94
VIS    2025250    183200   21.5500  142.9700      10.5       100       933        95
VIS    2025250    183200   21.5500  142.9500      10.2        98       933        96
VIS    2025250    183200   21.5300  142.9100      10.1        96       933        97
VIS    2025250    183200   21.5400  142.8900      10.1        98       934        96
VIS    2025250    183200   21.5400  142.8700      10.4       104       933        90
VIS    2025250    183200   21.5300  142.8400      10.8       100       934        92
VIS    2025250    183200   21.5300  142.8000      10.3       100       933        93
VIS    2025250    183200   21.5300  142.7800      10.0       102       932        95
VIS    2025250    183200   21.5500  142.7600      11.4        95       932        97
VIS    2025250    183200   21.5500  142.7300      12.7        90       927        97
VIS    2025250    183200   21.5400  142.7200      12.0        92       927        96
VIS    2025250    183200   21.5500  142.7000      11.7        93       926        98
VIS    2025250    183200   21.5300  142.6500      10.2        95       925        99
VIS    2025250    183200   21.5400  142.6400      10.6        95       925        99
VIS    2025250    183200   21.5400  142.6200      10.9        97       925        97
VIS    2025250    183200   21.5300  142.6000      10.4        98       927        95
VIS    2025250    183200   21.5400  142.5600       9.9        94       928        94
VIS    2025250    183200   21.5400  142.5400       9.5        93       929        97
VIS    2025250    183200   21.5400  142.5300       9.3        95       929        97
VIS    2025250    183200   21.5500  142.5000       9.5        99       930        97
VIS    2025250    183200   21.5300  142.4600       9.3       102       930        95
VIS    2025250    183200   21.5300  142.4100       7.8        91       932        94
VIS    2025250    183200   21.6300  151.9500       4.9        74       963        99
VIS    2025250    183200   21.6200  151.9300       5.6        71       929        98
VIS    2025250    183200   21.6200  151.8800       5.3        79       917        90
VIS    2025250    183200   21.6000  149.9500       8.6        86       925        97
VIS    2025250    183200   21.5800  149.9300       8.4        83       924        94
VIS    2025250    183200   21.6000  149.8900       8.9        84       872        92
VIS    2025250    183200   21.5700  149.3100      10.5        87       923        91
VIS    2025250    183200   21.5700  149.2900      10.3        87       927        91
VIS    2025250    183200   21.5900  149.2600      10.2        88       927        91
VIS    2025250    183200   21.5800  149.2400      10.1        87       919        94
VIS    2025250    183200   21.5700  149.2300      10.0        85       907        93
VIS    2025250    183200   21.5800  149.1100      10.5        87       915        93
VIS    2025250    183200   21.5700  149.0800      10.4        84       919        94
VIS    2025250    183200   21.5800  149.0600      10.4        83       927        95
VIS    2025250    183200   21.5700  149.0300       9.9        83       931        96
VIS    2025250    183200   21.5700  149.0200       9.9        82       931        97
VIS    2025250    183200   21.5600  148.9800       8.8        81       884        95
VIS    2025250    183200   21.5800  148.9500       7.8        88       884        97
VIS    2025250    183200   21.5600  148.9400       7.7        90       884        98
VIS    2025250    183200   21.5600  148.9100       7.7        86       902        97
VIS    2025250    183200   21.5700  148.8900       8.6        78       927        97
VIS    2025250    183200   21.5600  148.8600       8.4        78       935        95
VIS    2025250    183200   21.5800  148.8400       7.8        81       932        95
VIS    2025250    183200   21.5600  148.8000       7.8        85       910        94
VIS    2025250    183200   21.5600  148.7900       8.2        86       906        95
VIS    2025250    183200   21.5800  148.7700       8.5        86       893        94
VIS    2025250    183200   21.5700  148.7200       9.2        83       906        98
VIS    2025250    183200   21.5800  148.7200       9.2        81       908        99
VIS    2025250    183200   21.5800  148.6700       8.0        81       906        96
VIS    2025250    183200   21.5600  148.6700       7.8        80       903        97
VIS    2025250    183200   21.5700  148.6000       8.2        81       902        93
VIS    2025250    183200   21.5700  148.5800       8.2        80       904        99
VIS    2025250    183200   21.5600  148.5700       8.3        79       905        99
VIS    2025250    183200   21.5600  148.5200       8.7        75       927        98
VIS    2025250    183200   21.5600  148.5200       8.8        75       925        98
VIS    2025250    183200   21.5600  148.4700       9.0        77       917        92
VIS    2025250    183200   21.5700  148.4700       8.9        75       918        93
VIS    2025250    183200   21.5600  148.4200       9.2        76       919        99
VIS    2025250    183200   21.5700  148.3900       9.6        85       919        97
VIS    2025250    183200   21.5800  148.3900       9.6        90       919        92
VIS    2025250    183200   21.5800  148.3500       9.3        88       901        95
VIS    2025250    183200   21.5800  148.3200       9.0        86       897        99
VIS    2025250    183200   21.5600  148.3100       8.4        85       897        98
VIS    2025250    183200   21.5600  148.2800       7.9        84       898        95
VIS    2025250    183200   21.5600  148.2600       8.4        84       898        98
VIS    2025250    183200   21.5700  148.2200       8.9        81       882        97
VIS    2025250    183200   21.5500  148.2100       8.6        80       884        97
VIS    2025250    183200   21.5700  148.1800       8.7        79       885        97
VIS    2025250    183200   21.5500  148.1400       8.6        78       882        96
VIS    2025250    183200   21.5500  148.1000       8.5        80       888        96
VIS    2025250    183200   21.5600  148.0700       9.2        78       902        91
VIS    2025250    183200   21.5600  147.8900       8.5        85       937        96
VIS    2025250    183200   21.5700  147.8700       8.5        79       946        92
VIS    2025250    183200   21.5500  147.7600       6.2        90       862        95
VIS    2025250    183200   21.5500  147.7400       6.4        83       774        91
VIS    2025250    183200   21.5500  147.7300       6.7        82       774        91
VIS    2025250    183200   21.5500  147.5400       7.1       101       745        92
VIS    2025250    183200   21.5500  147.4300       8.9       104       758        90
VIS    2025250    183200   21.5700  147.4000       9.1        98       777        95
VIS    2025250    183200   21.5500  147.3600       8.6        91       763        91
VIS    2025250    183200   21.5500  147.3500       8.5        91       763        91
VIS    2025250    183200   21.5500  147.3100       9.5        96       823        98
VIS    2025250    183200   21.5600  147.3000       9.2        97       823        99
VIS    2025250    183200   21.5600  147.2600      10.0        94       860        98
VIS    2025250    183200   21.5600  147.2500      10.4        95       915        91
VIS    2025250    183200   21.5600  147.0500       9.9        80       995        93
VIS    2025250    183200   21.5600  147.0300      10.1        78       960        95
VIS    2025250    183200   21.5400  146.9800      10.8        83       959        95
VIS    2025250    183200   21.5600  146.9100       8.2        88       961        90
VIS    2025250    183200   21.5500  146.9000       8.1        94       955        90
VIS    2025250    183200   21.5500  146.8800       8.1       100       897        90
VIS    2025250    183200   21.5500  146.8300       8.4        95       748        95
VIS    2025250    183200   21.5400  146.8200       8.3        91       756        93
VIS    2025250    183200   21.5400  146.7800       8.1        90       823        92
VIS    2025250    183200   21.5500  146.7600       8.2       100       841        95
VIS    2025250    183200   21.5600  146.7500       8.0       101       849        96
VIS    2025250    183200   21.5500  146.4300       8.5        95       976        91
VIS    2025250    183200   21.5200  144.7300      13.4        87       914        99
VIS    2025250    183200   21.5300  144.7000      14.9        85       916        97
VIS    2025250    183200   21.5200  144.5800      10.2       119       768       100
VIS    2025250    183200   21.5100  144.3700      11.0       102       770        92
VIS    2025250    183200   21.5100  144.3400      11.6        97       770        91
VIS    2025250    183200   21.5300  144.3200      11.7        97       776        90
VIS    2025250    183200   21.5300  144.2600      10.7       102       834        94
VIS    2025250    183200   21.5200  144.2100       9.2       119       761        93
VIS    2025250    183200   21.5200  144.1700       9.9       116       767        93
VIS    2025250    183200   21.5100  144.1000      10.5       113       767        92
VIS    2025250    183200   21.5200  144.0600      10.0       121       771        96
VIS    2025250    183200   21.5200  144.0500       9.9       120       771        98
VIS    2025250    183200   21.5200  144.0200      10.3       112       771        90
VIS    2025250    183200   21.5300  143.9200      12.9        89       887        95
VIS    2025250    183200   21.5300  143.9100      12.9        88       896        96
VIS    2025250    183200   21.5100  143.8800      10.9        90       918        91
VIS    2025250    183200   21.5300  143.8400      11.5        86       927        95
VIS    2025250    183200   21.5300  143.8100      12.5        88       927        94
VIS    2025250    183200   21.5300  143.7700      12.8        89       928        96
VIS    2025250    183200   21.5200  143.7500      13.6        86       926        99
VIS    2025250    183200   21.5300  143.7200      13.0        87       926        99
VIS    2025250    183200   21.5300  143.7100      13.0        87       926       100
VIS    2025250    183200   21.5100  143.6600      12.7        87       926       100
VIS    2025250    183200   21.5100  143.6200      12.0        96       927        98
VIS    2025250    183200   21.5100  143.5900      11.7        98       929        97
VIS    2025250    183200   21.5100  143.5900      11.8        98       929        97
VIS    2025250    183200   21.5200  143.5400      13.1        89       927        97
VIS    2025250    183200   21.5100  143.5300      13.3        86       923        97
VIS    2025250    183200   21.5200  143.5100      13.5        88       919        95
VIS    2025250    183200   21.5200  143.4700      11.8        93       919        98
VIS    2025250    183200   21.5200  143.4500      11.3        97       920        98
VIS    2025250    183200   21.5300  143.4200      11.9        93       924        95
VIS    2025250    183200   21.5300  143.4200      11.9        92       924        94
VIS    2025250    183200   21.5200  143.3800      13.1        88       941        93
VIS    2025250    183200   21.5300  143.3600      13.2        88       946        97
VIS    2025250    183200   21.5200  143.3300      12.2        90       932        97
VIS    2025250    183200   21.5200  143.3000      12.0        93       935        97
VIS    2025250    183200   21.5300  143.2900      12.3        91       936        98
VIS    2025250    183200   21.5200  143.2500      10.9        90       935        98
VIS    2025250    183200   21.5100  143.2300      11.1        90       934        99
VIS    2025250    183200   21.5200  143.2000      12.0        93       936        99
VIS    2025250    183200   21.5100  143.1800      12.5        92       936        98
VIS    2025250    183200   21.5000  143.1500      11.8        92       935        96
VIS    2025250    183200   21.5200  143.1400      11.9        91       935        99
VIS    2025250    183200   21.5200  143.1000      10.0        94       935        96
VIS    2025250    183200   21.5100  143.0800      10.8        92       935        99
VIS    2025250    183200   21.5200  143.0600      10.8        94       936        97
VIS    2025250    183200   21.5100  143.0300      10.2       100       935        90
VIS    2025250    183200   21.5200  143.0000      10.1        99       934        91
VIS    2025250    183200   21.5200  142.9800      10.6        94       932        96
VIS    2025250    183200   21.5200  142.9600      10.8        92       932        98
VIS    2025250    183200   21.5200  142.9400      10.7        93       933        97
VIS    2025250    183200   21.5100  142.9100      10.4        96       933        96
VIS    2025250    183200   21.5100  142.8900      10.3       101       933        95
VIS    2025250    183200   21.5200  142.8500      10.2       103       933        92
VIS    2025250    183200   21.5200  142.8500      10.3       102       933        93
VIS    2025250    183200   21.5200  142.8100      10.0       100       933        93
VIS    2025250    183200   21.5100  142.7900       9.7       101       933        95
VIS    2025250    183200   21.5100  142.7500      10.0        95       931        96
VIS    2025250    183200   21.5200  142.7400      11.3        91       927       100
VIS    2025250    183200   21.5000  142.7200      10.5        90       927        99
VIS    2025250    183200   21.5100  142.6800       9.8        97       925        95
VIS    2025250    183200   21.5200  142.6700       9.7        98       925        93
VIS    2025250    183200   21.5100  142.6300      12.1        95       925        99
VIS    2025250    183200   21.5000  142.6000      11.6        90       926        99
VIS    2025250    183200   21.5000  142.6000      11.4        90       926        98
VIS    2025250    183200   21.5200  142.5600      10.0        87       928        94
VIS    2025250    183200   21.5100  142.5400       9.7        86       928        90
VIS    2025250    183200   21.5200  142.5100       9.1       101       929        95
VIS    2025250    183200   21.5200  142.4800       9.7       104       929        94
VIS    2025250    183200   21.5000  142.4600      11.1        99       929        98
VIS    2025250    183200   21.5000  142.4300       9.8       100       929        96
VIS    2025250    183200   21.5000  142.4100       8.9       100       931        91
VIS    2025250    183200   21.5500  149.3300      10.6        86       922        91
VIS    2025250    183200   21.5600  149.3000      10.4        87       921        91
VIS    2025250    183200   21.5600  149.2900      10.4        87       921        92
VIS    2025250    183200   21.5600  149.2500      10.1        87       923        94
VIS    2025250    183200   21.5600  149.2500      10.1        88       923        93
VIS    2025250    183200   21.5600  149.2200      10.0        85       905        93
VIS    2025250    183200   21.5400  149.1000      10.0        82       923        95
VIS    2025250    183200   21.5500  149.0800      10.1        83       920        94
VIS    2025250    183200   21.5400  149.0500       9.9        83       918        95
VIS    2025250    183200   21.5600  149.0200       9.9        83       931        96
VIS    2025250    183200   21.5600  149.0000       9.7        80       893        93
VIS    2025250    183200   21.5500  148.9800       9.1        80       884        94
VIS    2025250    183200   21.5400  148.9500       8.2        84       884        96
VIS    2025250    183200   21.5600  148.9400       7.7        90       884        98
VIS    2025250    183200   21.5600  148.9100       7.7        86       902        97
VIS    2025250    183200   21.5400  148.8700       8.6        79       932        95
VIS    2025250    183200   21.5400  148.8400       8.5        80       935        95
VIS    2025250    183200   21.5500  148.8200       7.9        84       933        94
VIS    2025250    183200   21.5400  148.8000       8.2        85       908        97
VIS    2025250    183200   21.5400  148.7700       8.6        83       905        96
VIS    2025250    183200   21.5400  148.7600       8.6        82       899        94
VIS    2025250    183200   21.5600  148.7200       8.9        84       901        97
VIS    2025250    183200   21.5400  148.7000       8.6        83       901        96
VIS    2025250    183200   21.5500  148.6700       8.0        79       903        97
VIS    2025250    183200   21.5500  148.6000       8.2        81       903        94
VIS    2025250    183200   21.5500  148.5700       8.7        79       909        99
VIS    2025250    183200   21.5400  148.5600       8.8        79       909        99
VIS    2025250    183200   21.5400  148.5300       9.0        78       915        99
VIS    2025250    183200   21.5400  148.4900       9.3        77       915        92
VIS    2025250    183200   21.5300  148.4800       9.4        81       915        91
VIS    2025250    183200   21.5500  148.4500       9.2        79       919        95
VIS    2025250    183200   21.5300  148.4300       9.5        79       919        99
VIS    2025250    183200   21.5300  148.4000      10.2        77       912        96
VIS    2025250    183200   21.5300  148.3800      10.3        79       908        97
VIS    2025250    183200   21.5300  148.3400       7.7        80       906        98
VIS    2025250    183200   21.5300  148.3100       7.5        82       908        96
VIS    2025250    183200   21.5400  148.3100       7.6        83       903        96
VIS    2025250    183200   21.5500  148.2800       7.9        84       901        94
VIS    2025250    183200   21.5300  148.2300       9.0        81       884        97
VIS    2025250    183200   21.5300  148.2100       8.6        80       884        97
VIS    2025250    183200   21.5400  148.1900       8.3        79       885        96
VIS    2025250    183200   21.5300  148.1700       8.2        78       882        94
VIS    2025250    183200   21.5400  148.1500       8.5        78       882        95
VIS    2025250    183200   21.5300  147.9800       8.4        92       968        92
VIS    2025250    183200   21.5400  147.9100       8.7        88       909        97
VIS    2025250    183200   21.5400  147.9000       8.6        86       909        96
VIS    2025250    183200   21.5400  147.7600       6.1        86       859        94
VIS    2025250    183200   21.5400  147.4400       9.0       106       758        91
VIS    2025250    183200   21.5200  147.4000       9.2        90       859        99
VIS    2025250    183200   21.5200  147.3900       9.3        89       859        99
VIS    2025250    183200   21.5200  147.3600       9.2        91       797        92
VIS    2025250    183200   21.5300  147.3300       9.4        90       761        90
VIS    2025250    183200   21.5200  147.3000      10.8        81       878        96
VIS    2025250    183200   21.5200  147.2900      10.7        84       899        99
VIS    2025250    183200   21.5200  147.2600      10.9        81       926        99
VIS    2025250    183200   21.5200  147.2500      10.8        83       962        95
VIS    2025250    183200   21.5200  147.0100      10.2        81       957        90
VIS    2025250    183200   21.5100  146.9900      10.6        84       951        95
VIS    2025250    183200   21.5300  146.9700      11.5        78       959        96
VIS    2025250    183200   21.5300  146.9200      10.3        70       985        93
VIS    2025250    183200   21.5300  146.8800       7.7       102       883        92
VIS    2025250    183200   21.5200  146.8600       7.7        98       816        95
VIS    2025250    183200   21.5100  146.8300       8.1        91       797        91
VIS    2025250    183200   21.5200  146.8000       7.8        89       819        92
VIS    2025250    183200   21.5300  146.7800       8.0        88       819        93
VIS    2025250    183200   21.5200  146.7500       8.6        88       779        92
VIS    2025250    183200   21.5300  146.7300       8.0        89       779        90
VIS    2025250    183200   21.5200  146.4900      13.1        70       958        95
VIS    2025250    183200   21.5200  146.4800      12.5        72       958        95
VIS    2025250    183200   21.5100  144.7300      13.7        88       879        94
VIS    2025250    183200   21.5000  144.7100      13.2        89       879        95
VIS    2025250    183200   21.5100  144.6400      10.5        98       785        90
VIS    2025250    183200   21.5000  144.6200      10.1       115       773        92
VIS    2025250    183200   21.5000  144.5900      10.0       115       766        91
VIS    2025250    183200   21.5100  144.3400      11.5        97       770        91
VIS    2025250    183200   21.5100  144.3400      11.7        96       770        90
VIS    2025250    183200   21.4900  144.2400      10.3       113       761        94
VIS    2025250    183200   21.4900  144.1900      10.4       116       767        93
VIS    2025250    183200   21.4900  144.1900      10.2       116       767        91
VIS    2025250    183200   21.4900  144.1400      11.0       121       766        95
VIS    2025250    183200   21.5100  144.1000      10.8       114       767        92
VIS    2025250    183200   21.5000  144.0800      10.4       117       767        94
VIS    2025250    183200   21.4800  143.9500       9.3       108       795        95
VIS    2025250    183200   21.4800  143.9200      10.8       115       856        95
VIS    2025250    183200   21.5000  143.8900      10.8       102       905        95
VIS    2025250    183200   21.5000  143.8800      10.6        95       917        92
VIS    2025250    183200   21.5000  143.8500      11.2        91       918        91
VIS    2025250    183200   21.4900  143.8200      11.9        91       915        98
VIS    2025250    183200   21.5000  143.8000      13.0        87       923        97
VIS    2025250    183200   21.4800  143.7700      10.7        89       923        95
VIS    2025250    183200   21.4800  143.7400      11.2        93       924        98
VIS    2025250    183200   21.4800  143.7400      11.7        91       925        98
VIS    2025250    183200   21.5000  143.7100      13.0        84       925        92
VIS    2025250    183200   21.5000  143.6800      12.6        85       925        90
VIS    2025250    183200   21.4800  143.6500      12.1        93       924        99
VIS    2025250    183200   21.5000  143.6200      12.1        94       927        98
VIS    2025250    183200   21.5000  143.6000      11.8        97       929        97
VIS    2025250    183200   21.5000  143.5900      11.7        97       929        97
VIS    2025250    183200   21.5000  143.5700      11.9        91       924        99
VIS    2025250    183200   21.5000  143.5300      13.1        87       920        97
VIS    2025250    183200   21.5000  143.5000      12.3        92       914        98
VIS    2025250    183200   21.4900  143.4700      11.2       100       914        98
VIS    2025250    183200   21.4900  143.4700      11.3       100       914        98
VIS    2025250    183200   21.5000  143.4400      11.2       102       918        96
VIS    2025250    183200   21.5000  143.4000      12.5        91       923        98
VIS    2025250    183200   21.4900  143.3900      13.0        90       928        99
VIS    2025250    183200   21.4800  143.3700      12.1        95       923        98
VIS    2025250    183200   21.4900  143.3200      11.5       101       920        96
VIS    2025250    183200   21.4900  143.3200      11.5       100       929        95
VIS    2025250    183200   21.5000  143.2900      11.1       100       929        95
VIS    2025250    183200   21.4900  143.2700      10.4        96       932        95
VIS    2025250    183200   21.4800  143.2400      11.4        91       925        99
VIS    2025250    183200   21.4900  143.2000      12.5        89       934        99
VIS    2025250    183200   21.4900  143.2000      12.7        89       934        98
VIS    2025250    183200   21.5000  143.1500      12.1        90       935        98
VIS    2025250    183200   21.4900  143.1400      11.4        91       934        97
VIS    2025250    183200   21.4900  143.1100      10.6        91       934        97
VIS    2025250    183200   21.4800  143.0800      11.0        98       933        97
VIS    2025250    183200   21.4900  143.0500      11.1       102       934        96
VIS    2025250    183200   21.4900  143.0500      11.0       101       934        96
VIS    2025250    183200   21.4800  143.0200      10.5        94       932        98
VIS    2025250    183200   21.4900  143.0000      10.2        93       932        95
VIS    2025250    183200   21.5000  142.9700      10.5        90       931        97
VIS    2025250    183200   21.4900  142.9400      10.7        94       933        94
VIS    2025250    183200   21.4800  142.9200      10.9        98       933        95
VIS    2025250    183200   21.4800  142.8900      10.9       102       933        93
VIS    2025250    183200   21.4800  142.8600       9.7       101       933        92
VIS    2025250    183200   21.5000  142.7900       9.6       101       933        92
VIS    2025250    183200   21.5000  142.7700       9.7        98       931        95
VIS    2025250    183200   21.4800  142.7500       9.6        95       931        93
VIS    2025250    183200   21.4900  142.7100      10.7        99       927        98
VIS    2025250    183200   21.4900  142.6900      10.5       100       927        98
VIS    2025250    183200   21.4800  142.6600      12.5       101       927        97
VIS    2025250    183200   21.4800  142.6400      13.1        97       927        97
VIS    2025250    183200   21.4900  142.6200      12.6        94       927        99
VIS    2025250    183200   21.4900  142.6000      11.6        90       927        99
VIS    2025250    183200   21.4900  142.5800      11.2        86       928        98
VIS    2025250    183200   21.4800  142.5300       9.1        92       928        96
VIS    2025250    183200   21.4700  142.5100       8.7        95       930        94
VIS    2025250    183200   21.4700  142.4800       9.1        95       929        96
VIS    2025250    183200   21.4700  142.4700       9.7        97       929        96
VIS    2025250    183200   21.4700  142.4500      10.2       101       929        94
VIS    2025250    183200   21.4900  142.4200       8.8       104       930        94
VIS    2025250    183200   21.5300  149.3200      10.8        86       917        91
VIS    2025250    183200   21.5300  149.2900      10.9        88       909        91
VIS    2025250    183200   21.5300  149.2900      10.8        88       909        91
VIS    2025250    183200   21.5400  149.2600      10.6        90       917        90
VIS    2025250    183200   21.5300  149.1200      10.0        82       926        94
VIS    2025250    183200   21.5400  149.0900       9.9        82       923        95
VIS    2025250    183200   21.5400  149.0800       9.9        82       920        95
VIS    2025250    183200   21.5100  149.0400       9.4        84       902        95
VIS    2025250    183200   21.5100  149.0300       9.5        84       902        94
VIS    2025250    183200   21.5200  149.0100       9.6        81       884        93
VIS    2025250    183200   21.5200  148.9600       8.9        81       884        95
VIS    2025250    183200   21.5100  148.9100       8.0        81       916        94
VIS    2025250    183200   21.5200  148.9100       8.0        82       916        94
VIS    2025250    183200   21.5200  148.8600       8.8        82       938        93
VIS    2025250    183200   21.5300  148.8400       8.7        80       935        93
VIS    2025250    183200   21.5200  148.8100       8.7        77       933        93
VIS    2025250    183200   21.5200  148.8100       8.7        78       933        94
VIS    2025250    183200   21.5300  148.7700       8.5        82       901        96
VIS    2025250    183200   21.5300  148.7600       8.5        81       899        96
VIS    2025250    183200   21.5200  148.7200       8.3        84       899        95
VIS    2025250    183200   21.5100  148.6800       8.5        83       902        97
VIS    2025250    183200   21.5300  148.6800       8.2        80       903        96
VIS    2025250    183200   21.5300  148.5900       8.5        81       905        92
VIS    2025250    183200   21.5300  148.5600       9.0        82       909        96
VIS    2025250    183200   21.5300  148.5500       9.0        82       911        97
VIS    2025250    183200   21.5200  148.5300       9.1        82       911        97
VIS    2025250    183200   21.5300  148.4800       9.4        81       911        91
VIS    2025250    183200   21.5300  148.4800       9.4        82       915        93
VIS    2025250    183200   21.5300  148.4300       9.4        80       919        99
VIS    2025250    183200   21.5300  148.4200       9.4        77       919        98
VIS    2025250    183200   21.5300  148.4000      10.0        77       919        96
VIS    2025250    183200   21.5200  148.3600       9.7        77       924        98
VIS    2025250    183200   21.5300  148.3300       7.4        79       907        96
VIS    2025250    183200   21.5300  148.3100       7.4        81       908        97
VIS    2025250    183200   21.5100  148.2900       8.6        83       911        95
VIS    2025250    183200   21.5100  148.2500       8.8        80       899        96
VIS    2025250    183200   21.5200  148.2400       8.9        80       884        96
VIS    2025250    183200   21.5200  148.2200       8.8        79       884        96
VIS    2025250    183200   21.5200  148.1800       8.3        79       883        94
VIS    2025250    183200   21.5100  148.1700       8.1        78       882        93
VIS    2025250    183200   21.5000  147.9700       7.3        93       968        90
VIS    2025250    183200   21.5200  147.9700       8.3        94       966        90
VIS    2025250    183200   21.5000  147.9200       8.9        88       909        98
VIS    2025250    183200   21.5100  147.9000       8.4        78       905        92
VIS    2025250    183200   21.5000  147.4700       8.5       106       780        90
VIS    2025250    183200   21.5100  147.4400       8.5       107       814        93
VIS    2025250    183200   21.5000  147.4000       9.8        86       877        99
VIS    2025250    183200   21.5000  147.3800      10.6        83       875        98
VIS    2025250    183200   21.5100  147.3600       9.9        88       792        90
VIS    2025250    183200   21.5000  147.3100      11.3        83       878        96
VIS    2025250    183200   21.5000  147.2900      11.1        81       903        98
VIS    2025250    183200   21.5100  147.2600      11.0        79       940        99
VIS    2025250    183200   21.5000  147.2400      10.9        78       966        97
VIS    2025250    183200   21.5100  147.0000      10.6        84       951        95
VIS    2025250    183200   21.4900  146.9800      10.8        80       936        92
VIS    2025250    183200   21.5100  146.8800       7.9        97       883        95
VIS    2025250    183200   21.4900  146.8500       9.2        88       883        97
VIS    2025250    183200   21.5100  146.8200       7.9        89       819        90
VIS    2025250    183200   21.5000  146.8100       7.7        85       819        90
VIS    2025250    183200   21.4900  146.7800       8.5        79       809        90
VIS    2025250    183200   21.5000  146.7600       8.6        85       750        91
VIS    2025250    183200   21.4900  146.6600       8.3        90       976        90
VIS    2025250    183200   21.4800  146.6200       8.6        90       982        91
VIS    2025250    183200   21.4800  146.5300      14.6        73       978        93
VIS    2025250    183200   21.4900  146.5100      15.5        70       978        94
VIS    2025250    183200   21.4800  144.8400      11.8       102       774        93
VIS    2025250    183200   21.4700  144.8300      11.6       107       774        95
VIS    2025250    183200   21.4800  144.6600      10.2       101       779        90
VIS    2025250    183200   21.4900  144.6400      10.2       106       777        91
VIS    2025250    183200   21.4600  144.5900      10.2       118       766        92
VIS    2025250    183200   21.4600  144.5900      10.2       116       762        95
VIS    2025250    183200   21.4700  144.2300      11.0       120       764        98
VIS    2025250    183200   21.4700  144.2100      11.1       120       766        96
VIS    2025250    183200   21.4800  144.1800      10.2       116       767        92
VIS    2025250    183200   21.4700  144.1500      10.5       119       766        99
VIS    2025250    183200   21.4600  144.1400      10.7       117       766        99
VIS    2025250    183200   21.4800  144.1000      10.6       118       765        94
VIS    2025250    183200   21.4800  143.9700       8.9       111       784        90
VIS    2025250    183200   21.4600  143.9500       8.4       111       841        90
VIS    2025250    183200   21.4600  143.9300       9.9       112       849        92
VIS    2025250    183200   21.4700  143.9200      10.6       117       856        96
VIS    2025250    183200   21.4700  143.8900      11.4       114       881        90
VIS    2025250    183200   21.4700  143.8500      12.1        97       905        98
VIS    2025250    183200   21.4600  143.8300      11.1        93       905        99
VIS    2025250    183200   21.4600  143.8000      11.2        88       916        98
VIS    2025250    183200   21.4700  143.7700      10.6        92       923        96
VIS    2025250    183200   21.4800  143.7700      10.5        92       923        95
VIS    2025250    183200   21.4800  143.7400      10.8        97       924        96
VIS    2025250    183200   21.4600  143.7100      11.9        91       924        99
VIS    2025250    183200   21.4700  143.6900      12.8        86       924        98
VIS    2025250    183200   21.4800  143.6600      12.3        92       924       100
VIS    2025250    183200   21.4600  143.6200      11.6        99       927        93
VIS    2025250    183200   21.4700  143.6200      11.8        97       927        95
VIS    2025250    183200   21.4800  143.5800      11.3        92       918        98
VIS    2025250    183200   21.4800  143.5700      11.3        92       918        98
VIS    2025250    183200   21.4600  143.5400      11.1       103       913        93
VIS    2025250    183200   21.4700  143.5200      10.7       102       914        92
VIS    2025250    183200   21.4700  143.4500      10.8       107       905        93
VIS    2025250    183200   21.4600  143.4400      11.0       106       910        92
VIS    2025250    183200   21.4800  143.3900      12.3        94       922        98
VIS    2025250    183200   21.4700  143.3700      11.4        98       922        97
VIS    2025250    183200   21.4800  143.3300      11.5       103       919        96
VIS    2025250    183200   21.4800  143.3100      11.2       103       922        95
VIS    2025250    183200   21.4500  143.2900      11.5        99       917        98
VIS    2025250    183200   21.4700  143.2700      11.1        96       925        97
VIS    2025250    183200   21.4700  143.2300      12.0        91       923        99
VIS    2025250    183200   21.4700  143.2200      11.9        92       924        99
VIS    2025250    183200   21.4700  143.1900      11.8        94       928        96
VIS    2025250    183200   21.4600  143.1500      11.3        98       924        96
VIS    2025250    183200   21.4600  143.1500      11.2        98       929        96
VIS    2025250    183200   21.4700  143.1300      10.8        93       932        96
VIS    2025250    183200   21.4700  143.0900      11.0        99       933        97
VIS    2025250    183200   21.4600  143.0600      11.7        99       927        98
VIS    2025250    183200   21.4600  143.0300      11.3        93       927        99
VIS    2025250    183200   21.4600  143.0100      10.7        91       930        98
VIS    2025250    183200   21.4700  143.0000      10.2        93       931        97
VIS    2025250    183200   21.4600  142.9600      10.0        95       931        95
VIS    2025250    183200   21.4700  142.9400      10.6        97       932        94
VIS    2025250    183200   21.4700  142.9100      11.0        98       933        95
VIS    2025250    183200   21.4700  142.8900      11.0       101       933        93
VIS    2025250    183200   21.4700  142.8600       9.9       101       933        91
VIS    2025250    183200   21.4700  142.8500       9.5        99       933        91
VIS    2025250    183200   21.4700  142.7800       9.5        97       933        91
VIS    2025250    183200   21.4500  142.7600       9.8        89       934        98
VIS    2025250    183200   21.4500  142.7500      10.6        87       934        99
VIS    2025250    183200   21.4500  142.7300      14.1        90       931        96
VIS    2025250    183200   21.4600  142.6900      12.7       104       929        95
VIS    2025250    183200   21.4500  142.6600      11.3       110       929        93
VIS    2025250    183200   21.4600  142.6400      11.0        96       928        98
VIS    2025250    183200   21.4500  142.6300      10.6        96       929        98
VIS    2025250    183200   21.4500  142.6000      11.0        98       930        95
VIS    2025250    183200   21.4500  142.5600      10.6        98       930        97
VIS    2025250    183200   21.4500  142.5400      10.1        96       931        98
VIS    2025250    183200   21.4700  142.5100       9.1        93       930        96
VIS    2025250    183200   21.4700  142.5100       9.0        93       930        95
VIS    2025250    183200   21.5300  151.8500       5.2        76       953        99
VIS    2025250    183200   21.5500  151.8300       4.6        79       964        95
VIS    2025250    183200   21.5000  149.3500      10.5        87       914        91
VIS    2025250    183200   21.5100  149.3400      10.7        86       916        91
VIS    2025250    183200   21.5100  149.3100      10.8        87       909        91
VIS    2025250    183200   21.4900  149.2700      10.5        88       920        91
VIS    2025250    183200   21.4900  149.2500      10.5        88       921        91
VIS    2025250    183200   21.4900  149.2300      10.4        88       929        94
VIS    2025250    183200   21.5000  149.1200      10.1        84       931        94
VIS    2025250    183200   21.4900  149.0900       9.8        82       916        95
VIS    2025250    183200   21.5100  149.0700       9.2        85       906        96
VIS    2025250    183200   21.4900  149.0600       9.1        84       895        95
VIS    2025250    183200   21.5000  149.0400       9.2        83       895        95
VIS    2025250    183200   21.4900  149.0000       9.0        80       890        90
VIS    2025250    183200   21.4900  148.9500       9.1        80       887        94
VIS    2025250    183200   21.4900  148.9300       8.6        82       889        95
VIS    2025250    183200   21.5000  148.9100       8.1        81       918        94
VIS    2025250    183200   21.5000  148.8600       8.7        84       943        90
VIS    2025250    183200   21.4900  148.8500       8.8        81       942        97
VIS    2025250    183200   21.5000  148.8300       9.2        79       940        94
VIS    2025250    183200   21.5000  148.8100       9.3        69       933        93
VIS    2025250    183200   21.4900  148.7600       8.0        82       905        99
VIS    2025250    183200   21.5100  148.7600       8.1        80       905        98
VIS    2025250    183200   21.5100  148.7300       8.0        83       899        95
VIS    2025250    183200   21.4800  148.7000       8.5        86       904        97
VIS    2025250    183200   21.5100  148.6800       8.5        84       902        97
VIS    2025250    183200   21.5000  148.6600       8.7        80       908        93
VIS    2025250    183200   21.5000  148.6200       8.3        81       907        93
VIS    2025250    183200   21.4800  148.5800       8.2        84       901        99
VIS    2025250    183200   21.4800  148.5600       8.5        87       901        99
VIS    2025250    183200   21.4900  148.5300       9.0        88       904        97
VIS    2025250    183200   21.5000  148.5200       9.0        86       908        97
VIS    2025250    183200   21.4800  148.4800       8.8        82       909        92
VIS    2025250    183200   21.4900  148.4800       8.9        82       911        94
VIS    2025250    183200   21.4900  148.4500       9.3        79       922        95
VIS    2025250    183200   21.4900  148.4100       9.4        76       922        92
VIS    2025250    183200   21.4900  148.3900       9.9        76       931        92
VIS    2025250    183200   21.5000  148.3700       9.5        76       950        92
VIS    2025250    183200   21.5000  148.3300       7.8        77       950        95
VIS    2025250    183200   21.4800  148.3100       8.9        81       936        99
VIS    2025250    183200   21.4900  148.2800       9.4        81       907        97
VIS    2025250    183200   21.4800  148.2800       9.4        79       907        97
VIS    2025250    183200   21.4900  148.2400       8.7        77       889        91
VIS    2025250    183200   21.4800  148.2000       8.0        79       886        92
VIS    2025250    183200   21.4800  148.2000       8.2        79       886        93
VIS    2025250    183200   21.4900  148.1700       8.4        81       885        92
VIS    2025250    183200   21.4800  148.0400       9.7        74       999        96
VIS    2025250    183200   21.4800  147.9800       7.5        95       985        90
VIS    2025250    183200   21.4800  147.9600       7.4        93       966        92
VIS    2025250    183200   21.4700  147.9300       8.0        88       940        93
VIS    2025250    183200   21.5000  147.9100       8.7        81       909        97
VIS    2025250    183200   21.4700  147.8400       8.8       100       870        90
VIS    2025250    183200   21.4800  147.8000       8.1       103       875        99
VIS    2025250    183200   21.4800  147.7800       6.4       115       875        92
VIS    2025250    183200   21.4700  147.7400       6.1       119       705        91
VIS    2025250    183200   21.4900  147.5200       8.3       106       755        91
VIS    2025250    183200   21.4900  147.5200       8.3       106       755        90
VIS    2025250    183200   21.4700  147.4800       8.5        93       883        93
VIS    2025250    183200   21.4900  147.4300       8.4        93       894        92
VIS    2025250    183200   21.4800  147.4100       9.0        86       885        98
VIS    2025250    183200   21.4700  147.3800      10.7        80       863        91
VIS    2025250    183200   21.4700  147.3700      10.9        79       864        90
VIS    2025250    183200   21.4900  147.3300      10.8        81       864        91
VIS    2025250    183200   21.4900  147.3000      11.5        83       899        93
VIS    2025250    183200   21.4700  147.2900      11.0        81       906        97
VIS    2025250    183200   21.4700  147.2500      10.1        78       940        93
VIS    2025250    183200   21.4600  147.0100      10.2        79       916        93
VIS    2025250    183200   21.4800  146.9900      10.7        80       923        91
VIS    2025250    183200   21.4800  146.8700       9.2        88       979        91
VIS    2025250    183200   21.4800  146.8500       9.3        87       942        95
VIS    2025250    183200   21.4600  146.8200       9.3        78       964        94
VIS    2025250    183200   21.4700  146.7900       9.9        67       892        92
VIS    2025250    183200   21.4600  146.6900       8.8        81       847        90
VIS    2025250    183200   21.4700  146.6600       8.4        85       967        91
VIS    2025250    183200   21.4600  146.5900      10.9        83       982        96
VIS    2025250    183200   21.4600  146.5900      11.7        81       982        97
VIS    2025250    183200   21.4800  146.5300      14.4        74       978        97
VIS    2025250    183200   21.4700  146.5100      13.6        73       968        98
VIS    2025250    183200   21.4500  144.7000       9.7       111       823        97
VIS    2025250    183200   21.4400  144.6900      10.4       112       824        99
VIS    2025250    183200   21.4600  144.6600      10.0       110       785        93
VIS    2025250    183200   21.4500  144.6400      10.1       111       777        95
VIS    2025250    183200   21.4600  144.6100      10.2       116       769        95
VIS    2025250    183200   21.4400  144.3200      10.4       116       765        94
VIS    2025250    183200   21.4400  144.2800       9.8       118       762        90
VIS    2025250    183200   21.4500  144.2600      10.0       116       763        93
VIS    2025250    183200   21.4400  144.2300      10.7       120       763        96
VIS    2025250    183200   21.4400  144.2000       9.9       117       764        90
VIS    2025250    183200   21.4400  144.1900       9.8       118       765        91
VIS    2025250    183200   21.4400  144.1500      10.1       114       766        94
VIS    2025250    183200   21.4400  144.1400      10.8       113       766        97
VIS    2025250    183200   21.4500  144.1100      11.7       114       765        95
VIS    2025250    183200   21.4300  143.9900      10.0       104       821        93
VIS    2025250    183200   21.4500  143.9600       8.8       107       841        92
VIS    2025250    183200   21.4300  143.9400      10.7        96       883        93
VIS    2025250    183200   21.4400  143.9200      10.8       103       875        94
VIS    2025250    183200   21.4400  143.8900      11.7       107       881        91
VIS    2025250    183200   21.4400  143.8600      11.9       102       900        92
VIS    2025250    183200   21.4500  143.8300      11.3        94       905        98
VIS    2025250    183200   21.4400  143.8100      12.0        86       905        98
VIS    2025250    183200   21.4500  143.7800      11.8        92       919        99
VIS    2025250    183200   21.4500  143.7600      11.0        99       923        95
VIS    2025250    183200   21.4300  143.7400      11.6        97       923        98
VIS    2025250    183200   21.4400  143.7200      12.5        89       922        99
VIS    2025250    183200   21.4500  143.6800      13.4        89       922        99
VIS    2025250    183200   21.4500  143.6700      13.3        91       922        99
VIS    2025250    183200   21.4300  143.6500      12.1        99       919        93
VIS    2025250    183200   21.4300  143.5900      10.4       100       912        92
VIS    2025250    183200   21.4500  143.5700      10.8        96       912        98
VIS    2025250    183200   21.4500  143.5400      11.1       104       908        95
VIS    2025250    183200   21.4400  143.4300      11.0       108       907        94
VIS    2025250    183200   21.4300  143.4000      10.8       105       916        93
VIS    2025250    183200   21.4500  143.3700      11.1       101       922        95
VIS    2025250    183200   21.4300  143.3500      10.8       102       914        95
VIS    2025250    183200   21.4400  143.1700      11.5        99       923        95
VIS    2025250    183200   21.4500  143.1400      10.8       100       924        96
VIS    2025250    183200   21.4400  143.1300       9.8       101       930        95
VIS    2025250    183200   21.4300  143.0900       9.9        95       930        97
VIS    2025250    183200   21.4400  143.0600      11.6        95       918       100
VIS    2025250    183200   21.4300  143.0400      12.9        89       913        98
VIS    2025250    183200   21.4500  143.0200      11.0        90       925        99
VIS    2025250    183200   21.4300  143.0000      10.6        87       924        98
VIS    2025250    183200   21.4400  142.9700       9.5        94       930        97
VIS    2025250    183200   21.4400  142.9400      10.3        99       931        96
VIS    2025250    183200   21.4500  142.9200      10.9        99       931        96
VIS    2025250    183200   21.4300  142.8900      10.6       103       932        93
VIS    2025250    183200   21.4500  142.8500       9.7        99       933        91
VIS    2025250    183200   21.4400  142.8000       9.8       100       931        93
VIS    2025250    183200   21.4300  142.7700      10.2        92       933        98
VIS    2025250    183200   21.4500  142.7500      10.3        88       934        99
VIS    2025250    183200   21.4300  142.7100      14.4        92       935        95
VIS    2025250    183200   21.4300  142.7100      14.7        92       935        94
VIS    2025250    183200   21.4400  142.6700      11.8       110       930        93
VIS    2025250    183200   21.4200  142.6400      10.5        99       934        93
VIS    2025250    183200   21.4200  142.6300      10.3        98       934        92
VIS    2025250    183200   21.4300  142.5900      10.6        97       932        96
VIS    2025250    183200   21.4300  142.5700      10.5        97       932        98
VIS    2025250    183200   21.4200  142.5500      10.3        94       935        96
VIS    2025250    183200   21.4300  142.5200      10.7        95       934        97
VIS    2025250    183200   21.4400  142.5000      10.3        93       934        91
VIS    2025250    183200   21.4400  142.4700       9.7        99       934        91
VIS    2025250    183200   21.4400  142.4600       9.3       101       933        90
VIS    2025250    183200   21.5100  151.8700       6.1        75       953        92
VIS    2025250    183200   21.5200  151.8500       5.5        76       953        94
VIS    2025250    183200   21.4800  149.3600      10.2        88       916        90
VIS    2025250    183200   21.4800  149.3200      10.2        86       914        92
VIS    2025250    183200   21.4700  149.2900       9.4        87       920        94
VIS    2025250    183200   21.4900  149.2800      10.2        87       920        92
VIS    2025250    183200   21.4700  149.2400       9.5        86       920        96
VIS    2025250    183200   21.4900  149.2300      10.2        87       929        94
VIS    2025250    183200   21.4700  149.1900       9.5        91       940        96
VIS    2025250    183200   21.4700  149.1800       9.6        92       940        95
VIS    2025250    183200   21.4800  149.1400      10.4        89       921        93
VIS    2025250    183200   21.4800  149.1100      10.3        84       920        94
VIS    2025250    183200   21.4600  149.0800       9.9        81       903        94
VIS    2025250    183200   21.4700  149.0800       9.7        81       899        94
VIS    2025250    183200   21.4800  149.0600       9.1        82       894        95
VIS    2025250    183200   21.4600  149.0200       9.3        78       891        92
VIS    2025250    183200   21.4800  149.0000       9.0        80       891        90
VIS    2025250    183200   21.4700  148.9800       9.1        79       898        93
VIS    2025250    183200   21.4600  148.9300       8.8        81       893        94
VIS    2025250    183200   21.4800  148.8700       8.5        81       960        92
VIS    2025250    183200   21.4800  148.8400       8.9        78       942        97
VIS    2025250    183200   21.4600  148.8300       9.4        74       930        95
VIS    2025250    183200   21.4700  148.8000       9.5        70       916        93
VIS    2025250    183200   21.4600  148.7700       8.7        83       909        97
VIS    2025250    183200   21.4600  148.7300       8.5        80       906        93
VIS    2025250    183200   21.4600  148.7200       8.3        80       906        93
VIS    2025250    183200   21.4600  148.6800       9.0        82       908        97
VIS    2025250    183200   21.4800  148.6600       8.9        83       908        96
VIS    2025250    183200   21.4700  148.6400       8.9        84       907        98
VIS    2025250    183200   21.4600  148.6000       8.8        85       904        99
VIS    2025250    183200   21.4700  148.5800       8.4        84       901       100
VIS    2025250    183200   21.4800  148.5600       8.6        87       900        99
VIS    2025250    183200   21.4800  148.5300       9.1        87       901        98
VIS    2025250    183200   21.4700  148.5100       9.1        84       905        99
VIS    2025250    183200   21.4700  148.5000       9.0        82       908        96
VIS    2025250    183200   21.4800  148.4700       9.0        81       909        93
VIS    2025250    183200   21.4800  148.4400       9.3        79       915        95
VIS    2025250    183200   21.4600  148.4200       9.1        79       906        98
VIS    2025250    183200   21.4700  148.4000       9.4        77       915        96
VIS    2025250    183200   21.4700  148.3500       9.1        76       950        96
VIS    2025250    183200   21.4500  148.3300       9.0        78       935        96
VIS    2025250    183200   21.4500  148.3200       8.6        80       934        97
VIS    2025250    183200   21.4500  148.2900       9.0        79       930        97
VIS    2025250    183200   21.4500  148.2700       9.6        77       912        95
VIS    2025250    183200   21.4500  148.2300       8.5        76       895        90
VIS    2025250    183200   21.4600  148.2100       8.0        78       895        90
VIS    2025250    183200   21.4500  148.1900       8.2        82       939        91
VIS    2025250    183200   21.4600  148.1500       8.7        85       938        93
VIS    2025250    183200   21.4700  148.0700       8.1        79       992        93
VIS    2025250    183200   21.4600  148.0700       6.8        77       986        92
VIS    2025250    183200   21.4500  148.0300       8.2        78       975        90
VIS    2025250    183200   21.4500  148.0000       8.3        77       985        95
VIS    2025250    183200   21.4700  147.9700       7.5        90       985        93
VIS    2025250    183200   21.4500  147.9400       7.6        83       958        90
VIS    2025250    183200   21.4600  147.9300       7.5        85       958        90
VIS    2025250    183200   21.4500  147.8500       7.9        97       874        95
VIS    2025250    183200   21.4700  147.8400       8.8       102       870        91
VIS    2025250    183200   21.4600  147.8100       9.2       101       880        96
VIS    2025250    183200   21.4500  147.7600       4.8       109       781        90
VIS    2025250    183200   21.4500  147.4800       8.3        89       911        91
VIS    2025250    183200   21.4600  147.4500       9.5        88       946        92
VIS    2025250    183200   21.4600  147.4200       9.3        84       870        95
VIS    2025250    183200   21.4400  147.3800       9.7        83       802        90
VIS    2025250    183200   21.4400  147.3400       9.7        76       889        95
VIS    2025250    183200   21.4500  147.3400      10.0        75       886        91
VIS    2025250    183200   21.4400  147.2900      10.1        75       917        92
VIS    2025250    183200   21.4600  147.2500       9.7        76       937        90
VIS    2025250    183200   21.4400  147.1300      11.3        77       993        92
VIS    2025250    183200   21.4400  147.0600      12.4        73       997        95
VIS    2025250    183200   21.4600  147.0400       9.8        86       984        94
VIS    2025250    183200   21.4400  147.0300       9.8        87       975        95
VIS    2025250    183200   21.4400  147.0000      10.3        86       923        97
VIS    2025250    183200   21.4400  146.9800      10.5        87       915        93
VIS    2025250    183200   21.4400  146.8700      11.1        88       979        95
VIS    2025250    183200   21.4500  146.8400       9.9        82       978        96
VIS    2025250    183200   21.4400  146.8100       9.6        72       933        94
VIS    2025250    183200   21.4500  146.8000      10.4        64       926        93
VIS    2025250    183200   21.4600  146.6900       9.1        80       864        92
VIS    2025250    183200   21.4400  146.5900      11.9        77       972        97
VIS    2025250    183200   21.4400  146.5800      12.6        76       969        98
VIS    2025250    183200   21.4500  146.5400      13.4        73       976        99
VIS    2025250    183200   21.4500  146.5300      14.1        70       976        99
VIS    2025250    183200   21.4200  145.6600      13.9        83       876        91
VIS    2025250    183200   21.4200  145.6600      13.6        84       876        92
VIS    2025250    183200   21.4300  144.6900      11.0       109       826        98
VIS    2025250    183200   21.4100  144.6700      11.6       110       818        97
VIS    2025250    183200   21.4100  144.6400      10.7       113       769        97
VIS    2025250    183200   21.4200  144.6300      10.6       112       769        97
VIS    2025250    183200   21.4100  144.4000      10.3       111       751        95
VIS    2025250    183200   21.4300  144.3200      10.3       116       765        95
VIS    2025250    183200   21.4300  144.3100      10.2       116       765        93
VIS    2025250    183200   21.4300  144.2800       9.6       118       762        90
VIS    2025250    183200   21.4100  144.2500      10.8       122       761        94
VIS    2025250    183200   21.4300  144.2300      10.8       120       763        94
VIS    2025250    183200   21.4300  144.1500       9.8       115       766        93
VIS    2025250    183200   21.4200  144.1200      11.6       117       769        92
VIS    2025250    183200   21.4100  144.1100      11.1       116       771        92
VIS    2025250    183200   21.4100  144.0900      10.7        99       772        92
VIS    2025250    183200   21.4200  143.9900      10.2       103       780        92
VIS    2025250    183200   21.4200  143.9700      10.2        99       838        95
VIS    2025250    183200   21.4300  143.9600      10.1        96       883        97
VIS    2025250    183200   21.4300  143.9400      10.7        94       883        94
VIS    2025250    183200   21.4200  143.9100      11.5       100       896        94
VIS    2025250    183200   21.4200  143.8800      11.4       106       895        92
VIS    2025250    183200   21.4200  143.8500      11.7       100       893        93
VIS    2025250    183200   21.4200  143.8300      12.1        93       900        98
VIS    2025250    183200   21.4200  143.8000      13.1        86       905        95
VIS    2025250    183200   21.4300  143.7900      12.8        88       913        98
VIS    2025250    183200   21.4300  143.7500      11.5        96       918        99
VIS    2025250    183200   21.4300  143.7200      12.4        89       911        98
VIS    2025250    183200   21.4100  143.7000      12.7        94       898        93
VIS    2025250    183200   21.4200  143.6900      12.6        95       900        92
VIS    2025250    183200   21.4300  143.6500      12.1        99       912        93
VIS    2025250    183200   21.4300  143.6300      11.5       104       912        90
VIS    2025250    183200   21.4300  143.6000      10.5       102       907        94
VIS    2025250    183200   21.4300  143.5800      10.8        95       907        98
VIS    2025250    183200   21.4300  143.5500      11.1        98       901        98
VIS    2025250    183200   21.4100  143.5200      10.1       109       888        99
VIS    2025250    183200   21.4200  143.3800      11.1       104       918        91
VIS    2025250    183200   21.4200  143.3600      11.2       100       917        93
VIS    2025250    183200   21.4100  143.1400      10.5        97       923        98
VIS    2025250    183200   21.4200  143.1000      10.1        91       929        98
VIS    2025250    183200   21.4100  143.0900      11.2        89       925        99
VIS    2025250    183200   21.4100  143.0200      11.8        89       913        98
VIS    2025250    183200   21.4000  142.9900      10.2        91       922        98
VIS    2025250    183200   21.4100  142.9500      10.1        94       929        98
VIS    2025250    183200   21.4100  142.9400      10.7        97       929        97
VIS    2025250    183200   21.4000  142.9200      10.9        99       930        96
VIS    2025250    183200   21.4200  142.8800       9.9       102       932        95
VIS    2025250    183200   21.4100  142.8800       9.7       103       932        95
VIS    2025250    183200   21.4000  142.7900      10.9       106       933        91
VIS    2025250    183200   21.4200  142.7700      10.6        96       933        98
VIS    2025250    183200   21.4000  142.7500      11.6        95       935        99
VIS    2025250    183200   21.4100  142.7300      13.7        91       935        96
VIS    2025250    183200   21.4000  142.6800      12.8        94       948        95
VIS    2025250    183200   21.4000  142.6800      12.5        93       948        96
VIS    2025250    183200   21.4200  142.6400      10.4       100       934        91
VIS    2025250    183200   21.4200  142.5600      10.0        94       935        93
VIS    2025250    183200   21.4200  142.5500      10.2        94       935        95
VIS    2025250    183200   21.4200  142.5200      11.1        96       934        98
VIS    2025250    183200   21.4100  142.5000      11.5       103       935        94
VIS    2025250    183200   21.4000  142.4000       7.2       108       938        90
VIS    2025250    183200   21.4800  151.8200       5.6        77       976        96
VIS    2025250    183200   21.5000  151.8100       4.0        74       975        91
VIS    2025250    183200   21.4500  149.4700       9.6        83       944        90
VIS    2025250    183200   21.4600  149.4500       9.5        83       948        90
VIS    2025250    183200   21.4400  149.3600      10.0        84       892        94
VIS    2025250    183200   21.4600  149.3400      10.0        87       912        92
VIS    2025250    183200   21.4400  149.3100       9.4        87       941        91
VIS    2025250    183200   21.4500  149.2900       8.9        87       914        96
VIS    2025250    183200   21.4400  149.2800       8.8        87       912        97
VIS    2025250    183200   21.4600  149.2500       9.1        88       911        97
VIS    2025250    183200   21.4400  149.2100       8.6        86       927        98
VIS    2025250    183200   21.4400  149.1900       8.6        86       928        98
VIS    2025250    183200   21.4500  149.1600       9.3        89       936        97
VIS    2025250    183200   21.4400  149.1300       9.8        83       921        96
VIS    2025250    183200   21.4500  149.1100      10.2        83       908        92
VIS    2025250    183200   21.4600  149.0900      10.2        81       906        93
VIS    2025250    183200   21.4500  149.0600       9.9        78       900        92
VIS    2025250    183200   21.4500  149.0500       9.8        78       898        93
VIS    2025250    183200   21.4600  149.0200       9.4        78       891        93
VIS    2025250    183200   21.4500  148.9900       9.3        79       898        95
VIS    2025250    183200   21.4400  148.9600       8.9        80       897        95
VIS    2025250    183200   21.4600  148.9400       8.7        81       893        96
VIS    2025250    183200   21.4400  148.8600       9.0        78       959        96
VIS    2025250    183200   21.4400  148.8400       9.1        74       932        95
VIS    2025250    183200   21.4500  148.8100       9.3        74       925        95
VIS    2025250    183200   21.4500  148.7800       9.3        83       912        95
VIS    2025250    183200   21.4300  148.7500       9.3        81       904        94
VIS    2025250    183200   21.4400  148.7400       9.0        79       904        94
VIS    2025250    183200   21.4400  148.7000       9.0        77       907        91
VIS    2025250    183200   21.4400  148.7000       9.0        77       908        90
VIS    2025250    183200   21.4300  148.6600       9.6        84       904        98
VIS    2025250    183200   21.4300  148.6400       9.7        86       904        99
VIS    2025250    183200   21.4400  148.6100       9.3        85       903        99
VIS    2025250    183200   21.4400  148.5800       9.5        82       899        99
VIS    2025250    183200   21.4400  148.5700       9.7        80       899        99
VIS    2025250    183200   21.4300  148.5200       9.1        79       907        97
VIS    2025250    183200   21.4300  148.5200       9.0        79       907        97
VIS    2025250    183200   21.4300  148.4900       9.0        78       907        94
VIS    2025250    183200   21.4500  148.4700       8.7        81       906        91
VIS    2025250    183200   21.4300  148.4300       8.5        81       905        94
VIS    2025250    183200   21.4400  148.4000       8.9        79       908        97
VIS    2025250    183200   21.4500  148.3800       9.4        77       915        96
VIS    2025250    183200   21.4400  148.3500       9.4        76       932        95
VIS    2025250    183200   21.4400  148.3300       8.9        77       935        95
VIS    2025250    183200   21.4500  148.3000       8.9        78       934        93
VIS    2025250    183200   21.4500  148.2900       9.1        77       930        93
VIS    2025250    183200   21.4400  148.2500       9.4        76       912        97
VIS    2025250    183200   21.4300  148.2200       8.7        77       939        94
VIS    2025250    183200   21.4500  148.2000       8.1        81       939        91
VIS    2025250    183200   21.4400  148.1900       8.2        82       939        92
VIS    2025250    183200   21.4300  148.1500       8.4        85       955        91
VIS    2025250    183200   21.4300  148.1200       8.7        85       993        91
VIS    2025250    183200   21.4400  148.1100       9.0        83       992        92
VIS    2025250    183200   21.4300  148.0800       7.9        83       980        90
VIS    2025250    183200   21.4400  148.0100       8.0        80       966        91
VIS    2025250    183200   21.4300  147.9700       7.5        80       966        91
VIS    2025250    183200   21.4300  147.8500       7.8        95       876        95
VIS    2025250    183200   21.4400  147.8300       8.2       100       876        94
VIS    2025250    183200   21.4200  147.6100       8.1       102       721        90
VIS    2025250    183200   21.4300  147.5700       9.3       103       763        92
VIS    2025250    183200   21.4300  147.4400       9.7        84       948        90
VIS    2025250    183200   21.4400  147.4300       9.5        81       870        93
VIS    2025250    183200   21.4400  147.4000       9.4        82       802        90
VIS    2025250    183200   21.4200  147.3800       8.7        89       814        96
VIS    2025250    183200   21.4400  147.3500       9.4        79       878        95
VIS    2025250    183200   21.4200  147.3200      10.1        79       910        98
VIS    2025250    183200   21.4400  147.3000      10.3        74       917        94
VIS    2025250    183200   21.4400  147.2700       9.5        76       917        91
VIS    2025250    183200   21.4300  147.1300      11.2        77       993        93
VIS    2025250    183200   21.4100  147.0800      11.8        75       993        95
VIS    2025250    183200   21.4200  146.9200       8.9        91       918        90
VIS    2025250    183200   21.4300  146.9000       9.3        81       910        97
VIS    2025250    183200   21.4100  146.8700      10.6        87       979        93
VIS    2025250    183200   21.4300  146.8500      10.4        82       978        96
VIS    2025250    183200   21.4300  146.8200       9.7        77       935        92
VIS    2025250    183200   21.4100  146.7900       9.7        82       918        91
VIS    2025250    183200   21.4200  146.7700      10.4        78       905        90
VIS    2025250    183200   21.4100  146.7400      10.9        80       905        97
VIS    2025250    183200   21.4200  146.7100      10.5        79       915        97
VIS    2025250    183200   21.4200  146.6900      10.1        77       942        91
VIS    2025250    183200   21.4200  146.6800      10.0        76       942        90
VIS    2025250    183200   21.4100  146.5800      12.4        75       960        96
VIS    2025250    183200   21.4100  146.5600      13.1        78       969        99
VIS    2025250    183200   21.4100  146.5500      13.2        79       964        98
VIS    2025250    183200   21.4200  145.6700      13.6        84       873        91
VIS    2025250    183200   21.4000  144.7000      12.1       104       791        93
VIS    2025250    183200   21.4000  144.6800      11.9       108       808        95
VIS    2025250    183200   21.4100  144.6400      10.9       113       769        97
VIS    2025250    183200   21.4000  144.5800      10.1       115       756        93
VIS    2025250    183200   21.4000  144.4200       9.9       109       751        90
VIS    2025250    183200   21.4000  144.3900       9.7       114       751        96
VIS    2025250    183200   21.4000  144.3800       9.7       115       759        97
VIS    2025250    183200   21.3900  144.3500       9.5       112       759        95
VIS    2025250    183200   21.3900  144.3200       9.6       114       759        93
VIS    2025250    183200   21.4000  144.3000       9.6       116       761        90
VIS    2025250    183200   21.4100  144.2400      11.0       121       763        96
VIS    2025250    183200   21.4000  144.2400      11.0       120       763        96
VIS    2025250    183200   21.4100  144.1900      10.1       115       766        91
VIS    2025250    183200   21.3900  144.1500      10.6       125       768        94
VIS    2025250    183200   21.4000  144.1200      10.7       121       769        96
VIS    2025250    183200   21.3900  144.1100      10.0       116       771        96
VIS    2025250    183200   21.3800  144.0700       9.7        94       772        91
VIS    2025250    183200   21.4000  144.0000      11.0        96       780        91
VIS    2025250    183200   21.3800  143.9700      10.7        99       852        95
VIS    2025250    183200   21.4000  143.9600      11.1        97       883        98
VIS    2025250    183200   21.4000  143.9300      11.4        96       899        94
VIS    2025250    183200   21.3900  143.9000      11.2        98       895        95
VIS    2025250    183200   21.4000  143.8700      11.1       102       893        98
VIS    2025250    183200   21.3900  143.8600      11.7        94       883        94
VIS    2025250    183200   21.3800  143.8300      13.4        89       879        93
VIS    2025250    183200   21.3800  143.7900      12.9        91       888        92
VIS    2025250    183200   21.3800  143.7900      12.7        91       888        92
VIS    2025250    183200   21.4000  143.7500      12.2        91       886        95
VIS    2025250    183200   21.3800  143.7200      12.9        99       877        91
VIS    2025250    183200   21.3900  143.7100      13.2        95       885        91
VIS    2025250    183200   21.4000  143.6300      10.6       107       900        95
VIS    2025250    183200   21.3800  143.6100      12.2        90       894        96
VIS    2025250    183200   21.4000  143.5800      12.6        97       894        97
VIS    2025250    183200   21.3800  143.5500      14.4       106       887        92
VIS    2025250    183200   21.4000  143.5200      10.3       109       887        99
VIS    2025250    183200   21.4000  143.3800      11.8       103       902        97
VIS    2025250    183200   21.4000  143.1200      10.4        94       921        98
VIS    2025250    183200   21.4000  143.0000      11.1        91       919        99
VIS    2025250    183200   21.3900  142.9800      11.1        91       928       100
VIS    2025250    183200   21.3900  142.9500      11.0        90       930        99
VIS    2025250    183200   21.3900  142.9500      10.9        90       930        97
VIS    2025250    183200   21.3800  142.9100      10.4        98       930        95
VIS    2025250    183200   21.3800  142.8800       9.8        99       931        95
VIS    2025250    183200   21.3800  142.8700       9.7        98       931        95
VIS    2025250    183200   21.4000  142.8400       9.5       104       933        90
VIS    2025250    183200   21.4000  142.7600      11.4        98       935        96
VIS    2025250    183200   21.4000  142.7500      11.7        95       935        98
VIS    2025250    183200   21.3800  142.7300      12.3        96       946        92
VIS    2025250    183200   21.3800  142.6900      12.2        96       948        95
VIS    2025250    183200   21.3800  142.6700      11.3        94       936        94
VIS    2025250    183200   21.3700  142.6300      10.0       101       933        93
VIS    2025250    183200   21.3800  142.5800       9.3        98       936        91
VIS    2025250    183200   21.3900  142.5700       9.4        98       936        90
VIS    2025250    183200   21.3800  142.4900      11.6       110       940        91
VIS    2025250    183200   21.4700  151.8200       6.0        76       976        96
VIS    2025250    183200   21.4600  151.7900       6.7        74       917        92
VIS    2025250    183200   21.4500  151.7600       7.1        78       964        91
VIS    2025250    183200   21.4600  151.6300       5.5        85       969        98
VIS    2025250    183200   21.4200  149.4700       9.6        82       936        92
VIS    2025250    183200   21.4300  149.4400       9.7        87       934        91
VIS    2025250    183200   21.4200  149.3600      10.2        83       884        96
VIS    2025250    183200   21.4200  149.3600      10.2        84       886        96
VIS    2025250    183200   21.4400  149.3100       9.4        87       941        91
VIS    2025250    183200   21.4300  149.2900       8.9        88       912        97
VIS    2025250    183200   21.4400  149.2700       8.8        88       911        97
VIS    2025250    183200   21.4300  149.2400       8.7        89       911        94
VIS    2025250    183200   21.4200  149.2200       8.7        85       927        96
VIS    2025250    183200   21.4400  149.1900       8.6        85       927        98
VIS    2025250    183200   21.4200  149.1600       8.6        82       927        99
VIS    2025250    183200   21.4100  149.1600       8.7        81       917        99
VIS    2025250    183200   21.4200  149.1200       9.4        78       920        96
VIS    2025250    183200   21.4200  149.1000       9.5        78       920        93
VIS    2025250    183200   21.4300  149.0700       9.9        80       906        91
VIS    2025250    183200   21.4200  149.0400      10.0        77       904        92
VIS    2025250    183200   21.4200  149.0100      10.0        76       899        93
VIS    2025250    183200   21.4300  148.9800       9.4        79       895        95
VIS    2025250    183200   21.4300  148.9800       9.3        79       895        95
VIS    2025250    183200   21.4100  148.9500       8.9        80       897        93
VIS    2025250    183200   21.4100  148.8600       9.3        87       941        94
VIS    2025250    183200   21.4200  148.8400       9.3        80       921        92
VIS    2025250    183200   21.4300  148.8200       9.2        77       922        92
VIS    2025250    183200   21.4300  148.7800       9.5        82       912        95
VIS    2025250    183200   21.4200  148.7600       9.5        78       904        93
VIS    2025250    183200   21.4100  148.7500       9.4        76       903        94
VIS    2025250    183200   21.4200  148.7100       9.2        76       903        91
VIS    2025250    183200   21.4300  148.6800       9.2        80       907        95
VIS    2025250    183200   21.4100  148.6600       9.1        84       902        99
VIS    2025250    183200   21.4300  148.6500       9.7        85       903        99
VIS    2025250    183200   21.4300  148.6100       9.6        87       901        99
VIS    2025250    183200   21.4100  148.5800       9.7        82       906        98
VIS    2025250    183200   21.4100  148.5700       9.8        81       906        97
VIS    2025250    183200   21.4200  148.5300       9.1        79       907        97
VIS    2025250    183200   21.4300  148.5200       9.0        78       907        97
VIS    2025250    183200   21.4100  148.4800       8.8        77       913        90
VIS    2025250    183200   21.4200  148.4500       8.6        80       905        93
VIS    2025250    183200   21.4200  148.4500       8.5        80       905        93
VIS    2025250    183200   21.4200  148.4200       8.4        80       906        93
VIS    2025250    183200   21.4200  148.3800       8.5        77       920        91
VIS    2025250    183200   21.4200  148.3700       8.4        79       923        90
VIS    2025250    183200   21.4200  148.3300       9.1        78       940        94
VIS    2025250    183200   21.4200  148.3200       9.1        78       946        92
VIS    2025250    183200   21.4200  148.2700      10.0        75       946        93
VIS    2025250    183200   21.4200  148.2500       9.8        76       947        96
VIS    2025250    183200   21.4100  148.2400       9.8        77       948        97
VIS    2025250    183200   21.4100  148.2000       8.3        81       951        91
VIS    2025250    183200   21.4200  148.1900       8.3        81       951        91
VIS    2025250    183200   21.4100  148.1600       8.5        84       936        91
VIS    2025250    183200   21.4100  148.1400       8.5        84       941        91
VIS    2025250    183200   21.4200  148.1000       8.3        83       959        92
VIS    2025250    183200   21.4100  148.0800       8.1        85       943        92
VIS    2025250    183200   21.4000  148.0200       8.4        86       947        91
VIS    2025250    183200   21.4100  147.9900       7.8        83       960        91
VIS    2025250    183200   21.4000  147.9100       7.0        90       882        94
VIS    2025250    183200   21.4000  147.8700       8.5       102       875        96
VIS    2025250    183200   21.4100  147.8500       8.1        96       876        95
VIS    2025250    183200   21.4200  147.6200       7.3       100       714        92
VIS    2025250    183200   21.3900  147.6000       6.8       103       763        95
VIS    2025250    183200   21.4100  147.5800       8.7       107       769        91
VIS    2025250    183200   21.3900  147.4800       9.1        91       972        90
VIS    2025250    183200   21.3900  147.4400       9.0        91       977        94
VIS    2025250    183200   21.4100  147.4200       8.7        87       842        94
VIS    2025250    183200   21.4000  147.4000       7.7        95       802        97
VIS    2025250    183200   21.4000  147.3900       7.9        93       786        96
VIS    2025250    183200   21.4000  147.3600       8.7        90       862        99
VIS    2025250    183200   21.4000  147.3200      11.1        85       917       100
VIS    2025250    183200   21.3900  147.3100      11.5        84       920       100
VIS    2025250    183200   21.4100  147.2900      11.0        82       945        99
VIS    2025250    183200   21.4000  147.2500       9.6        89       949        93
VIS    2025250    183200   21.3900  147.2200      10.5        95       961        93
VIS    2025250    183200   21.3900  147.1900      11.3        90       959        95
VIS    2025250    183200   21.3900  147.1800      10.4        91       938        95
VIS    2025250    183200   21.4100  147.1000      11.0        75       992        90
VIS    2025250    183200   21.4100  147.0700      11.9        75       993        97
VIS    2025250    183200   21.4000  146.9000       9.3        82       954        95
VIS    2025250    183200   21.3900  146.8800      10.6        82       979        94
VIS    2025250    183200   21.4000  146.8500      10.1        80       950        94
VIS    2025250    183200   21.4100  146.8300      10.1        77       935        93
VIS    2025250    183200   21.4100  146.8000       9.6        82       918        91
VIS    2025250    183200   21.3800  146.7600      10.1        80       918        93
VIS    2025250    183200   21.3900  146.7400      11.1        78       915        98
VIS    2025250    183200   21.3800  146.7300      11.1        77       922        97
VIS    2025250    183200   21.4000  146.7000       9.4        81       938        94
VIS    2025250    183200   21.3800  146.6600       9.9        82       923        91
VIS    2025250    183200   21.4000  146.5900      12.4        75       960        94
VIS    2025250    183200   21.4000  146.5700      12.6        77       960        99
VIS    2025250    183200   21.4000  146.5600      13.1        80       963        99
VIS    2025250    183200   21.3800  145.7900      15.9        81       897        92
VIS    2025250    183200   21.3700  145.7700      15.7        82       897        92
VIS    2025250    183200   21.3800  145.7400      15.4        81       893        91
VIS    2025250    183200   21.3800  145.7300      14.4        83       888        92
VIS    2025250    183200   21.3600  144.6900      11.1       118       755        93
VIS    2025250    183200   21.3600  144.6000      10.5       120       757        95
VIS    2025250    183200   21.3600  144.5900      10.5       120       757        95
VIS    2025250    183200   21.3700  144.5600      10.5       120       752        96
VIS    2025250    183200   21.3800  144.4900      10.2       115       749        91
VIS    2025250    183200   21.3800  144.4900      10.3       113       749        92
VIS    2025250    183200   21.3700  144.4200      10.2       117       750        99
VIS    2025250    183200   21.3700  144.4100       9.7       113       750        98
VIS    2025250    183200   21.3800  144.3700       9.3       112       759        93
VIS    2025250    183200   21.3800  144.3600       9.3       112       759        93
VIS    2025250    183200   21.3800  144.3200       9.7       114       759        93
VIS    2025250    183200   21.3700  144.2400      10.7       116       763        97
VIS    2025250    183200   21.3700  144.2000      11.3       113       766        97
VIS    2025250    183200   21.3600  144.1700      11.3       106       766        94
VIS    2025250    183200   21.3800  144.1500      10.6       122       768        98
VIS    2025250    183200   21.3800  143.9800      10.7        98       849        93
VIS    2025250    183200   21.3600  143.9500      11.3        99       862        96
VIS    2025250    183200   21.3600  143.9300      11.3        98       862        96
VIS    2025250    183200   21.3600  143.9000      11.7        95       879        94
VIS    2025250    183200   21.3600  143.8900      11.6        94       879        93
VIS    2025250    183200   21.3700  143.8200      13.5        87       878        92
VIS    2025250    183200   21.3700  143.8200      13.7        87       879        92
VIS    2025250    183200   21.3800  143.7900      12.9        91       886        92
VIS    2025250    183200   21.3600  143.7500      13.2        96       875        93
VIS    2025250    183200   21.3700  143.7300      13.1       100       876        90
VIS    2025250    183200   21.3800  143.7200      12.7       103       877        91
VIS    2025250    183200   21.3800  143.6200      12.0        86       894        95
VIS    2025250    183200   21.3700  143.5800      13.4        96       891        93
VIS    2025250    183200   21.3600  143.5700      13.0        99       891        95
VIS    2025250    183200   21.3600  143.4000      13.5        85       900        92
VIS    2025250    183200   21.3600  143.3900      13.6        90       902        95
VIS    2025250    183200   21.3600  143.3700      13.8        94       900        94
VIS    2025250    183200   21.3500  142.9900      14.6        85       931        96
VIS    2025250    183200   21.3600  142.9700      13.2        85       933        98
VIS    2025250    183200   21.3700  142.9400      11.0        89       931        91
VIS    2025250    183200   21.3500  142.9200      10.9        93       931        96
VIS    2025250    183200   21.3600  142.8900      10.5        97       930        96
VIS    2025250    183200   21.3700  142.8700      10.1        96       930        96
VIS    2025250    183200   21.3700  142.8300       9.6        99       933        94
VIS    2025250    183200   21.3600  142.8200      10.1       102       930        95
VIS    2025250    183200   21.3500  142.7500      10.4       105       940        93
VIS    2025250    183200   21.3700  142.7200      11.9        98       958        95
VIS    2025250    183200   21.3700  142.6900      11.7        98       939        96
VIS    2025250    183200   21.3700  142.6800      11.5        98       936        96
VIS    2025250    183200   21.3500  142.6500      10.7       101       933        97
VIS    2025250    183200   21.3600  142.6300      10.1       101       934        96
VIS    2025250    183200   21.3500  142.5900       9.6        99       939        94
VIS    2025250    183200   21.3500  142.5800       9.5        99       939        93
VIS    2025250    183200   21.3500  142.5100      10.2        94       957        95
VIS    2025250    183200   21.3500  142.5100      10.3        96       961        94
VIS    2025250    183200   21.3700  142.3800       8.2        99       936        92
VIS    2025250    183200   21.4300  151.8400       6.3        67       950        95
VIS    2025250    183200   21.4400  151.8300       6.5        64       950        94
VIS    2025250    183200   21.4500  151.8000       6.9        68       917        93
VIS    2025250    183200   21.4300  151.7100       6.7        88       917        92
VIS    2025250    183200   21.4300  151.7100       6.7        90       929        92
VIS    2025250    183200   21.4300  151.6700       6.8        92       979        93
VIS    2025250    183200   21.4500  151.5100       4.5        86       971        94
VIS    2025250    183200   21.4000  149.3900      11.4        87       886        91
VIS    2025250    183200   21.4000  149.3700      10.9        86       886        93
VIS    2025250    183200   21.4100  149.3500      10.1        85       896        96
VIS    2025250    183200   21.4000  149.3200       9.2        88       907        97
VIS    2025250    183200   21.4100  149.3000       8.7        89       912        97
VIS    2025250    183200   21.3900  149.2700       8.8        87       906        94
VIS    2025250    183200   21.3900  149.2500       9.2        87       920        90
VIS    2025250    183200   21.4100  149.2200       9.0        83       927        96
VIS    2025250    183200   21.4100  149.2100       9.0        82       927        97
VIS    2025250    183200   21.4000  149.1600       9.0        80       903        96
VIS    2025250    183200   21.4000  149.1400       9.2        79       917        97
VIS    2025250    183200   21.4000  149.1300       9.2        78       917        97
VIS    2025250    183200   21.4000  149.1000       9.0        76       922        92
VIS    2025250    183200   21.3900  149.0600       9.9        78       928        95
VIS    2025250    183200   21.3900  149.0400      10.3        80       913        93
VIS    2025250    183200   21.4100  149.0100      10.1        76       899        92
VIS    2025250    183200   21.4000  149.0000      10.2        76       899        91
VIS    2025250    183200   21.4000  148.9600       9.5        77       895        90
VIS    2025250    183200   21.4100  148.9500       9.1        79       897        92
VIS    2025250    183200   21.3900  148.9200       8.4        81       918        90
VIS    2025250    183200   21.3900  148.8800       8.7        86       941        91
VIS    2025250    183200   21.4000  148.8700       9.1        87       941        92
VIS    2025250    183200   21.4100  148.8500       9.4        87       932        90
VIS    2025250    183200   21.3800  148.8100       9.1        79       904        94
VIS    2025250    183200   21.3900  148.7900       9.0        76       904        94
VIS    2025250    183200   21.3800  148.7600       9.0        80       901        92
VIS    2025250    183200   21.4000  148.7400       9.1        78       902        94
VIS    2025250    183200   21.3800  148.7200       9.2        85       901        97
VIS    2025250    183200   21.4000  148.6800       8.8        85       902        98
VIS    2025250    183200   21.3900  148.6600       9.2        91       900        98
VIS    2025250    183200   21.3800  148.6400       9.4        92       901        98
VIS    2025250    183200   21.3800  148.6100       9.6        89       902        98
VIS    2025250    183200   21.4000  148.5900       9.6        85       904        99
VIS    2025250    183200   21.4000  148.5700       9.7        83       907        97
VIS    2025250    183200   21.4000  148.5300       9.0        81       912        93
VIS    2025250    183200   21.3900  148.5100       8.6        78       926        92
VIS    2025250    183200   21.4000  148.4400       8.6        79       907        91
VIS    2025250    183200   21.3800  148.4200       8.8        79       908        91
VIS    2025250    183200   21.4000  148.3700       8.3        79       919        91
VIS    2025250    183200   21.4000  148.3700       8.3        80       922        91
VIS    2025250    183200   21.3900  148.3400       9.6        78       931        98
VIS    2025250    183200   21.3900  148.2700      10.2        79       948        97
VIS    2025250    183200   21.3800  148.2500      10.6        79       954        94
VIS    2025250    183200   21.3900  148.2400      10.0        77       953        98
VIS    2025250    183200   21.3800  148.2200       9.6        79       929        98
VIS    2025250    183200   21.3800  148.1800       8.5        82       892        94
VIS    2025250    183200   21.3800  148.1400       8.6        85       891        91
VIS    2025250    183200   21.3900  148.1400       8.5        85       906        90
VIS    2025250    183200   21.4000  148.1200       8.4        84       941        90
VIS    2025250    183200   21.3800  148.0700       8.1        83       908        96
VIS    2025250    183200   21.3800  148.0600       8.1        85       908        94
VIS    2025250    183200   21.3900  148.0200       8.6        87       937        91
VIS    2025250    183200   21.3700  148.0000       8.3        80       936        97
VIS    2025250    183200   21.3700  147.9800       8.3        81       922        96
VIS    2025250    183200   21.3700  147.9200       8.2        90       882        97
VIS    2025250    183200   21.3800  147.9100       8.1        91       882        98
VIS    2025250    183200   21.3700  147.8700       9.2       103       876        96
VIS    2025250    183200   21.3800  147.8400       8.4        94       882        92
VIS    2025250    183200   21.3700  147.6700       8.2       114       714        91
VIS    2025250    183200   21.3700  147.6500       6.7       103       714        94
VIS    2025250    183200   21.3800  147.6300       6.0       103       721        95
VIS    2025250    183200   21.3900  147.6000       6.3       104       761        97
VIS    2025250    183200   21.3700  147.5700       8.0       103       814        91
VIS    2025250    183200   21.3900  147.4800       9.0        92       966        91
VIS    2025250    183200   21.3700  147.4400       8.2        92       975        91
VIS    2025250    183200   21.3700  147.4100       7.8        96       786        94
VIS    2025250    183200   21.3800  147.4000       7.5        97       772        96
VIS    2025250    183200   21.3800  147.3800       7.7        94       772        93
VIS    2025250    183200   21.3700  147.3600       8.6        85       793        90
VIS    2025250    183200   21.3700  147.3100      11.0        83       941        99
VIS    2025250    183200   21.3700  147.3000      10.9        82       936        99
VIS    2025250    183200   21.3800  147.2800      10.2        81       920        97
VIS    2025250    183200   21.3800  147.2400       9.8        96       924        95
VIS    2025250    183200   21.3600  147.2200      10.2        93       906        98
VIS    2025250    183200   21.3700  147.2000      11.0        89       924        97
VIS    2025250    183200   21.3800  147.1800      10.9        89       938        97
VIS    2025250    183200   21.3600  146.9100       9.4        84       987        94
VIS    2025250    183200   21.3800  146.8900      10.6        82       987        97
VIS    2025250    183200   21.3800  146.8800      10.6        81       979        95
VIS    2025250    183200   21.3700  146.8500      10.1        77       937        91
VIS    2025250    183200   21.3700  146.7900       9.4        85       913        91
VIS    2025250    183200   21.3800  146.7800       9.4        85       913        91
VIS    2025250    183200   21.3800  146.7400      11.1        76       922        96
VIS    2025250    183200   21.3800  146.7300      11.1        77       938        97
VIS    2025250    183200   21.3600  146.7000      10.5        82       937        94
VIS    2025250    183200   21.3700  146.6700       9.8        85       923        93
VIS    2025250    183200   21.3600  146.6400      10.5        81       914        92
VIS    2025250    183200   21.3600  146.6300      10.5        81       914        93
VIS    2025250    183200   21.3800  146.5900      12.6        78       920        90
VIS    2025250    183200   21.3600  145.7900      15.9        79       897        91
VIS    2025250    183200   21.3700  145.7800      15.8        81       897        92
VIS    2025250    183200   21.3500  145.7500      14.9        86       893        90
VIS    2025250    183200   21.3700  145.7300      15.3        86       888        91
VIS    2025250    183200   21.3600  144.6700      10.8       120       757        96
VIS    2025250    183200   21.3500  144.6500      10.5       120       759        96
VIS    2025250    183200   21.3500  144.6300      10.4       120       758        92
VIS    2025250    183200   21.3600  144.6000      10.4       120       757        94
VIS    2025250    183200   21.3600  144.5700      10.7       120       753        94
VIS    2025250    183200   21.3600  144.5500      10.8       119       751        93
VIS    2025250    183200   21.3500  144.2200      11.3       111       763        94
VIS    2025250    183200   21.3600  144.2100      11.3       110       764        96
VIS    2025250    183200   21.3500  144.0000      10.5        99       843        90
VIS    2025250    183200   21.3500  143.9900      10.6        98       843        90
VIS    2025250    183200   21.3400  143.9600      11.3        94       849        90
VIS    2025250    183200   21.3500  143.9200      11.3        96       862        96
VIS    2025250    183200   21.3500  143.9200      11.3        97       862        96
VIS    2025250    183200   21.3500  143.8600      11.7        86       873        90
VIS    2025250    183200   21.3500  143.8300      12.7        86       872        90
VIS    2025250    183200   21.3500  143.8100      14.3        87       875        90
VIS    2025250    183200   21.3500  143.7800      13.8        92       870        91
VIS    2025250    183200   21.3500  143.7700      13.2        94       875        94
VIS    2025250    183200   21.3500  143.5800      11.1        92       894        93
VIS    2025250    183200   21.3500  143.5700      11.9        97       893        97
VIS    2025250    183200   21.3300  143.3800      14.0        87       911        92
VIS    2025250    183200   21.3300  143.3600      12.6        89       909        94
VIS    2025250    183200   21.3300  143.0000      14.6        85       921        93
VIS    2025250    183200   21.3500  142.9700      13.7        84       933        96
VIS    2025250    183200   21.3300  142.9400      12.7        85       933        96
VIS    2025250    183200   21.3500  142.9200      10.9        92       931        96
VIS    2025250    183200   21.3300  142.9000      11.8        91       926        99
VIS    2025250    183200   21.3200  142.8600      12.3        93       926        98
VIS    2025250    183200   21.3300  142.8400      11.4        97       928        98
VIS    2025250    183200   21.3200  142.8200      11.5        99       930        96
VIS    2025250    183200   21.3400  142.7800      10.6       105       933        93
VIS    2025250    183200   21.3400  142.7700      10.2       107       934        90
VIS    2025250    183200   21.3300  142.7500      11.3        98       935        97
VIS    2025250    183200   21.3300  142.7100      12.2        93       935        99
VIS    2025250    183200   21.3400  142.6900      11.1        98       936        98
VIS    2025250    183200   21.3300  142.6800      10.9        99       936        98
VIS    2025250    183200   21.3200  142.6500      10.7        99       934        96
VIS    2025250    183200   21.3300  142.6200      10.2       101       934        94
VIS    2025250    183200   21.3400  142.6000       9.8       100       937        94
VIS    2025250    183200   21.3400  142.5700       8.8        99       948        90
VIS    2025250    183200   21.3300  142.5400       9.0        95       950        95
VIS    2025250    183200   21.3200  142.5300       9.0        94       952        94
VIS    2025250    183200   21.3200  142.3800       9.1       104       931        94
VIS    2025250    183200   21.4200  151.8500       5.7        70       950        97
VIS    2025250    183200   21.4300  151.8400       6.4        67       950        94
VIS    2025250    183200   21.4200  151.7000       6.5        89       917        90
VIS    2025250    183200   21.4000  151.5000       4.7        65       941        97
VIS    2025250    183200   21.3800  149.4200      11.9        89       891        90
VIS    2025250    183200   21.3900  149.3200       9.9        87       895        96
VIS    2025250    183200   21.3800  149.2800       9.1        85       906        91
VIS    2025250    183200   21.3800  149.2700       9.0        86       906        94
VIS    2025250    183200   21.3900  149.2500       9.5        87       920        91
VIS    2025250    183200   21.3800  149.1800      10.1        83       902        90
VIS    2025250    183200   21.3800  149.1500      10.0        81       901        90
VIS    2025250    183200   21.3800  149.1000       9.2        78       906        91
VIS    2025250    183200   21.3800  149.0600      10.2        78       924        95
VIS    2025250    183200   21.3700  149.0300      10.6        80       903        91
VIS    2025250    183200   21.3800  149.0000      10.5        78       902        91
VIS    2025250    183200   21.3700  148.9900      10.2        77       900        91
VIS    2025250    183200   21.3600  148.9600      10.0        75       894        91
VIS    2025250    183200   21.3700  148.9400       9.5        76       894        92
VIS    2025250    183200   21.3700  148.9200       8.5        76       911        92
VIS    2025250    183200   21.3600  148.8900       8.4        73       906        90
VIS    2025250    183200   21.3600  148.8500       8.9        84       894        95
VIS    2025250    183200   21.3600  148.8400       8.7        85       894        96
VIS    2025250    183200   21.3700  148.8100       8.9        81       901        95
VIS    2025250    183200   21.3800  148.7700       8.9        78       901        92
VIS    2025250    183200   21.3800  148.7700       8.9        79       901        92
VIS    2025250    183200   21.3700  148.7400       8.9        83       899        93
VIS    2025250    183200   21.3700  148.7000       9.5        87       901        99
VIS    2025250    183200   21.3600  148.6700       9.9        90       900        98
VIS    2025250    183200   21.3600  148.6500       9.7        91       897        97
VIS    2025250    183200   21.3700  148.6300       9.5        91       901        97
VIS    2025250    183200   21.3700  148.5900       9.5        86       905        97
VIS    2025250    183200   21.3600  148.5900       9.4        85       906        97
VIS    2025250    183200   21.3700  148.5600       9.0        85       911        97
VIS    2025250    183200   21.3700  148.5200       8.8        80       926        95
VIS    2025250    183200   21.3700  148.4400       8.9        79       906        94
VIS    2025250    183200   21.3700  148.4300       8.9        79       906        94
VIS    2025250    183200   21.3700  148.4100       9.1        76       909        93
VIS    2025250    183200   21.3500  148.3700      10.6        81       913        97
VIS    2025250    183200   21.3700  148.3500      10.6        80       919        98
VIS    2025250    183200   21.3700  148.3200      11.4        76       931        96
VIS    2025250    183200   21.3700  148.2700      10.5        81       953        95
VIS    2025250    183200   21.3700  148.2500      10.5        79       954        93
VIS    2025250    183200   21.3700  148.2200       9.9        80       949        97
VIS    2025250    183200   21.3600  148.1900       8.8        81       895        96
VIS    2025250    183200   21.3600  148.1800       8.5        83       892        94
VIS    2025250    183200   21.3700  148.1500       8.6        84       891        93
VIS    2025250    183200   21.3500  148.1300       8.5        85       892        97
VIS    2025250    183200   21.3500  148.0900       7.4        78       901        95
VIS    2025250    183200   21.3600  148.0600       7.7        80       926        91
VIS    2025250    183200   21.3700  148.0600       7.9        83       926        92
VIS    2025250    183200   21.3500  148.0300       7.9        80       905        93
VIS    2025250    183200   21.3600  147.9900       8.2        84       895        96
VIS    2025250    183200   21.3500  147.9700       8.2        89       895        95
VIS    2025250    183200   21.3600  147.9400       8.3        94       898        96
VIS    2025250    183200   21.3700  147.9200       8.4        92       883        98
VIS    2025250    183200   21.3600  147.8900       9.1       103       879        96
VIS    2025250    183200   21.3500  147.8800       8.6       104       878        96
VIS    2025250    183200   21.3400  147.6600       8.4       116       742        95
VIS    2025250    183200   21.3400  147.6500       8.1       111       746        98
VIS    2025250    183200   21.3400  147.6100       6.6        93       758        96
VIS    2025250    183200   21.3600  147.5900       6.4       100       777        95
VIS    2025250    183200   21.3500  147.5600       8.3       103       796        99
VIS    2025250    183200   21.3400  147.5500       8.2       102       796        99
VIS    2025250    183200   21.3500  147.5200       8.9        94       862        98
VIS    2025250    183200   21.3600  147.4900       8.9        95       933        93
VIS    2025250    183200   21.3500  147.4600       7.8        97       875        97
VIS    2025250    183200   21.3400  147.4500       7.6        97       867        97
VIS    2025250    183200   21.3600  147.4200       7.6        95       786        96
VIS    2025250    183200   21.3600  147.4000       7.3        95       749        93
VIS    2025250    183200   21.3500  147.3300      10.6        76       908        94
VIS    2025250    183200   21.3500  147.3300      10.8        77       923        97
VIS    2025250    183200   21.3600  147.3000      10.6        81       923        99
VIS    2025250    183200   21.3400  147.2700       8.9        94       797        92
VIS    2025250    183200   21.3400  147.2400       9.1        97       786        95
VIS    2025250    183200   21.3600  147.2200       9.8        92       850        98
VIS    2025250    183200   21.3400  147.1800       9.4        85       833        90
VIS    2025250    183200   21.3500  146.9100       9.9        88       991        95
VIS    2025250    183200   21.3400  146.8800      10.3        82       954        93
VIS    2025250    183200   21.3400  146.8700      10.6        79       949        94
VIS    2025250    183200   21.3400  146.8000      11.1        79       913        92
VIS    2025250    183200   21.3400  146.8000      11.1        79       913        94
VIS    2025250    183200   21.3400  146.7500      10.7        84       921        97
VIS    2025250    183200   21.3400  146.7500      10.8        83       927        96
VIS    2025250    183200   21.3300  146.7200      11.1        81       934        91
VIS    2025250    183200   21.3500  146.6900      10.6        82       928        94
VIS    2025250    183200   21.3300  146.6700      11.5        79       911        93
VIS    2025250    183200   21.3400  146.6300      11.5        81       917        94
VIS    2025250    183200   21.3400  146.6200      11.2        81       917        93
VIS    2025250    183200   21.3500  146.5800      12.2        79       912        91
VIS    2025250    183200   21.3300  146.1500      12.6        87       863        91
VIS    2025250    183200   21.3200  145.8300      16.0        80       901        91
VIS    2025250    183200   21.3400  145.8100      16.1        78       909        92
VIS    2025250    183200   21.3300  145.7900      14.1        79       901        96
VIS    2025250    183200   21.3200  145.7600      11.5        93       851        90
VIS    2025250    183200   21.3200  144.7200      10.5       117       770        93
VIS    2025250    183200   21.3200  144.6800      10.4       111       764        93
VIS    2025250    183200   21.3200  144.6800      10.3       111       764        93
VIS    2025250    183200   21.3300  144.6500      10.3       112       762        90
VIS    2025250    183200   21.3300  144.0000      11.5       102       843        94
VIS    2025250    183200   21.3100  143.9800      12.2        95       841        90
VIS    2025250    183200   21.3300  143.8400      11.3        87       869        90
VIS    2025250    183200   21.3300  143.8000      13.8        91       870        91
VIS    2025250    183200   21.3100  143.4100      14.6        84       906        92
VIS    2025250    183200   21.3100  143.3700      13.2        89       916        96
VIS    2025250    183200   21.3200  143.3600      13.0        88       916        96
VIS    2025250    183200   21.3100  143.1700      10.7        96       916        99
VIS    2025250    183200   21.3200  143.1600      11.3        93       915       100
VIS    2025250    183200   21.3100  142.9900      14.1        84       931        95
VIS    2025250    183200   21.3200  142.9500      13.8        86       934        98
VIS    2025250    183200   21.3200  142.9300      13.2        87       932        97
VIS    2025250    183200   21.3200  142.9200      12.7        88       922        98
VIS    2025250    183200   21.3200  142.8900      12.0        91       926        99
VIS    2025250    183200   21.3200  142.8600      12.6        93       926        99
VIS    2025250    183200   21.3100  142.8300      12.0        95       936        97
VIS    2025250    183200   21.3000  142.8200      12.1        92       941        96
VIS    2025250    183200   21.3100  142.8000      12.2        96       938        98
VIS    2025250    183200   21.3000  142.7500      11.7        92       939        98
VIS    2025250    183200   21.3000  142.7500      11.7        92       938        98
VIS    2025250    183200   21.3200  142.7100      12.6        90       935        99
VIS    2025250    183200   21.3100  142.6800      11.6        95       936        99
VIS    2025250    183200   21.3100  142.6600      11.2        97       935        98
VIS    2025250    183200   21.3200  142.6400      10.4       102       934        93
VIS    2025250    183200   21.3000  142.6200       9.1       108       934        90
VIS    2025250    183200   21.3000  142.5800       9.2       101       947        92
VIS    2025250    183200   21.3100  142.5600       9.0       100       948        93
VIS    2025250    183200   21.3000  142.5300       8.9       102       949        92
VIS    2025250    183200   21.3000  142.4500       8.7       113       932        90
VIS    2025250    183200   21.3000  142.3800       8.0       110       931        91
VIS    2025250    183200   21.4000  151.8200       5.6        77       966        97
VIS    2025250    183200   21.3800  151.8000       6.5        84       969        92
VIS    2025250    183200   21.3800  151.5800       7.0        79       960        94
VIS    2025250    183200   21.3800  151.5600       6.8        85       965        91
VIS    2025250    183200   21.3700  151.5500       6.7        83       968        92
VIS    2025250    183200   21.3700  151.5100       6.1        68       935        96
VIS    2025250    183200   21.3800  151.4900       5.2        67       930        92
VIS    2025250    183200   21.3500  149.5400      10.6        81       924        90
VIS    2025250    183200   21.3500  149.0000      10.1        78       903        91
VIS    2025250    183200   21.3500  148.9900      10.0        77       903        91
VIS    2025250    183200   21.3600  148.9700      10.0        76       899        90
VIS    2025250    183200   21.3400  148.9300       8.9        75       899        94
VIS    2025250    183200   21.3400  148.8900       9.1        73       906        95
VIS    2025250    183200   21.3300  148.8800       9.2        75       906        96
VIS    2025250    183200   21.3500  148.8500       8.9        84       894        96
VIS    2025250    183200   21.3400  148.8300       8.6        81       892        98
VIS    2025250    183200   21.3500  148.8000       8.8        80       898        95
VIS    2025250    183200   21.3500  148.7800       8.8        79       898        91
VIS    2025250    183200   21.3300  148.7600       9.1        81       897        92
VIS    2025250    183200   21.3400  148.7300       9.2        87       899        96
VIS    2025250    183200   21.3300  148.7000       9.8        91       904        93
VIS    2025250    183200   21.3400  148.6900       9.9        90       904        96
VIS    2025250    183200   21.3400  148.6600      10.4        90       902        96
VIS    2025250    183200   21.3300  148.6300      10.2        84       901        98
VIS    2025250    183200   21.3500  148.5900       9.4        84       907        98
VIS    2025250    183200   21.3500  148.5900       9.4        83       907        98
VIS    2025250    183200   21.3500  148.5500       8.7        82       912        98
VIS    2025250    183200   21.3500  148.5400       8.9        81       912        99
VIS    2025250    183200   21.3400  148.4900       9.0        81       914        92
VIS    2025250    183200   21.3500  148.4900       8.7        79       914        92
VIS    2025250    183200   21.3400  148.4500       8.5        77       909        95
VIS    2025250    183200   21.3500  148.4300       9.0        75       908        96
VIS    2025250    183200   21.3500  148.4100       9.8        73       909        94
VIS    2025250    183200   21.3400  148.3600      10.9        80       913        96
VIS    2025250    183200   21.3300  148.3400       9.8        77       921        96
VIS    2025250    183200   21.3300  148.3300       9.6        77       924        95
VIS    2025250    183200   21.3300  148.3000       9.7        78       933        94
VIS    2025250    183200   21.3500  148.2800      10.2        82       941        97
VIS    2025250    183200   21.3300  148.2400       9.9        80       953        97
VIS    2025250    183200   21.3300  148.2300       9.9        80       953        96
VIS    2025250    183200   21.3300  148.2100       9.1        79       914        96
VIS    2025250    183200   21.3400  148.1700       8.5        81       891        94
VIS    2025250    183200   21.3400  148.1500       8.8        82       892        96
VIS    2025250    183200   21.3300  148.1100       8.1        84       905        96
VIS    2025250    183200   21.3300  148.1100       7.8        82       905        96
VIS    2025250    183200   21.3400  148.0400       7.9        80       899        94
VIS    2025250    183200   21.3200  148.0100       8.8        94       887        92
VIS    2025250    183200   21.3200  148.0000       8.8        96       886        92
VIS    2025250    183200   21.3300  147.9600       8.8        98       892        97
VIS    2025250    183200   21.3200  147.9400       8.7        99       905        96
VIS    2025250    183200   21.3300  147.9200       8.4       101       905        95
VIS    2025250    183200   21.3300  147.8900       8.4       105       879        95
VIS    2025250    183200   21.3400  147.8800       8.3       104       876        96
VIS    2025250    183200   21.3400  147.6700       9.2       123       725        90
VIS    2025250    183200   21.3300  147.6500       7.6       112       758        99
VIS    2025250    183200   21.3200  147.6200       7.2        97       742        96
VIS    2025250    183200   21.3200  147.6000       7.7       104       740        95
VIS    2025250    183200   21.3200  147.5600       7.7       107       758        99
VIS    2025250    183200   21.3200  147.5300       7.7       105       755        99
VIS    2025250    183200   21.3200  147.5200       7.8       106       755        99
VIS    2025250    183200   21.3200  147.4900       7.7       107       817        99
VIS    2025250    183200   21.3300  147.4700       7.5       103       817        99
VIS    2025250    183200   21.3300  147.4500       7.4        98       765        98
VIS    2025250    183200   21.3300  147.2500       8.9        97       786        93
VIS    2025250    183200   21.3300  147.2500       8.9        96       786        92
VIS    2025250    183200   21.3200  147.0500      14.5        76       982        96
VIS    2025250    183200   21.3200  147.0400      14.4        76       982        95
VIS    2025250    183200   21.3300  146.8900      10.3        89       979        94
VIS    2025250    183200   21.3300  146.8900      10.3        86       979        94
VIS    2025250    183200   21.3200  146.8000      12.1        79       915        96
VIS    2025250    183200   21.3100  146.7800      11.5        83       918        99
VIS    2025250    183200   21.3200  146.7400      10.8        86       923        97
VIS    2025250    183200   21.3300  146.7400      10.8        84       927        96
VIS    2025250    183200   21.3300  146.6900      11.6        79       920        92
VIS    2025250    183200   21.3300  146.6700      11.8        79       910        91
VIS    2025250    183200   21.3200  146.6400      11.8        81       909        96
VIS    2025250    183200   21.3100  146.6300      12.4        81       911        96
VIS    2025250    183200   21.3100  146.3800      11.0        78       889        93
VIS    2025250    183200   21.3100  146.3400      11.5        74       884        93
VIS    2025250    183200   21.3100  146.3400      11.5        74       884        93
VIS    2025250    183200   21.3000  146.3100      12.4        74       884        92
VIS    2025250    183200   21.3000  146.2800      13.6        76       894        92
VIS    2025250    183200   21.3100  146.2600      13.8        80       917        94
VIS    2025250    183200   21.3000  146.1500      11.7        91       863        95
VIS    2025250    183200   21.3200  146.1400      12.3        87       863        92
VIS    2025250    183200   21.3100  145.9200      15.2        79       897        90
VIS    2025250    183200   21.3000  145.9000      15.5        81       905        92
VIS    2025250    183200   21.3100  145.8700      16.6        79       905        91
VIS    2025250    183200   21.3100  145.8500      16.8        80       901        90
VIS    2025250    183200   21.3100  145.8200      15.1        80       901        94
VIS    2025250    183200   21.3200  145.7900      13.1        81       901        97
VIS    2025250    183200   21.3200  145.7700      11.8        89       883        97
VIS    2025250    183200   21.3200  145.7600      11.6        91       851        91
VIS    2025250    183200   21.2900  144.7200      10.5       112       759        95
VIS    2025250    183200   21.2900  144.7000      10.4       111       759        95
VIS    2025250    183200   21.3100  144.6800      10.2       108       762        94
VIS    2025250    183200   21.3100  144.6700      10.2       107       762        92
VIS    2025250    183200   21.2900  144.6100      10.8       116       742        93
VIS    2025250    183200   21.3000  143.5900      12.8        89       896        91
VIS    2025250    183200   21.2900  143.3900      14.1        87       909        95
VIS    2025250    183200   21.2800  143.3700      15.4        82       905        90
VIS    2025250    183200   21.2800  143.2900      13.7        83       913        94
VIS    2025250    183200   21.2800  143.2800      14.3        80       912        93
VIS    2025250    183200   21.2800  143.2100      10.3        96       911        97
VIS    2025250    183200   21.3000  143.2000      10.1       100       916        97
VIS    2025250    183200   21.3000  143.1800      10.8        99       918        98
VIS    2025250    183200   21.3000  143.1500      11.5        97       918        99
VIS    2025250    183200   21.2800  142.9900      13.6        86       921        95
VIS    2025250    183200   21.2800  142.9800      13.6        87       906        93
VIS    2025250    183200   21.2800  142.8200      11.2        96       941        93
VIS    2025250    183200   21.2900  142.8100      12.6        90       952        96
VIS    2025250    183200   21.2900  142.7700      12.3        92       949        97
VIS    2025250    183200   21.2900  142.7600      12.0        92       949        97
VIS    2025250    183200   21.2800  142.7300       9.8        91       946        97
VIS    2025250    183200   21.2800  142.7000      11.1        95       935        99
VIS    2025250    183200   21.2700  142.6700      11.4       100       933        94
VIS    2025250    183200   21.2900  142.6600      11.1       100       935        97
VIS    2025250    183200   21.2800  142.6200       8.9       109       932        92
VIS    2025250    183200   21.2700  142.6000       8.9       104       930        91
VIS    2025250    183200   21.2900  142.5700       9.3        99       940        93
VIS    2025250    183200   21.2900  142.5600       9.4        99       940        93
VIS    2025250    183200   21.2900  142.4600       9.4       112       932        91
VIS    2025250    183200   21.2700  142.4100       9.1       107       931        90
VIS    2025250    183200   21.2900  142.3800       7.9       110       931        91
VIS    2025250    183200   21.3500  151.8400       6.2        74       982        96
VIS    2025250    183200   21.3600  151.8200       5.9        78       984        96
VIS    2025250    183200   21.3600  151.7900       6.4        85       947        92
VIS    2025250    183200   21.3500  151.7700       6.2        84       920        94
VIS    2025250    183200   21.3600  151.5500       6.9        80       968        93
VIS    2025250    183200   21.3700  151.5200       6.3        70       935        96
VIS    2025250    183200   21.3700  151.5000       6.1        69       930        93
VIS    2025250    183200   21.3200  149.4700      10.8        82       916        92
VIS    2025250    183200   21.3300  149.4600      11.1        82       926        90
VIS    2025250    183200   21.3200  149.0200      11.5        80       918        90
VIS    2025250    183200   21.3100  148.9800      10.0        77       918        91
VIS    2025250    183200   21.3200  148.9400       9.2        78       909        90
VIS    2025250    183200   21.3200  148.9100       9.3        75       909        94
VIS    2025250    183200   21.3100  148.8900       9.8        78       906        94
VIS    2025250    183200   21.3100  148.8700       9.5        79       898        94
VIS    2025250    183200   21.3100  148.8500       9.2        80       893        95
VIS    2025250    183200   21.3200  148.8300       8.7        78       892        97
VIS    2025250    183200   21.3200  148.8000       8.7        79       895        96
VIS    2025250    183200   21.3300  148.7600       9.1        81       897        92
VIS    2025250    183200   21.3200  148.7500       9.5        86       896        92
VIS    2025250    183200   21.3200  148.7300       9.8        88       903        95
VIS    2025250    183200   21.3300  148.7000       9.8        93       904        90
VIS    2025250    183200   21.3300  148.6600      10.7        94       904        94
VIS    2025250    183200   21.3300  148.6300      10.3        85       901        98
VIS    2025250    183200   21.3100  148.6100      10.0        81       905        97
VIS    2025250    183200   21.3100  148.5800       9.4        81       908        97
VIS    2025250    183200   21.3200  148.5700       9.2        80       909        97
VIS    2025250    183200   21.3200  148.5300       9.0        82       911        99
VIS    2025250    183200   21.3000  148.5200       9.3        85       911        98
VIS    2025250    183200   21.3100  148.4800       9.2        83       912        91
VIS    2025250    183200   21.3100  148.4700       8.9        80       912        91
VIS    2025250    183200   21.3100  148.4400       8.8        72       911        92
VIS    2025250    183200   21.3100  148.4100       9.8        76       911        96
VIS    2025250    183200   21.3100  148.4000      10.3        76       911        95
VIS    2025250    183200   21.3100  148.3500       9.8        75       919        95
VIS    2025250    183200   21.3000  148.3300       9.1        78       930        96
VIS    2025250    183200   21.3100  148.3200       9.0        78       937        95
VIS    2025250    183200   21.3000  148.2700       9.5        79       964        99
VIS    2025250    183200   21.3100  148.2700       9.8        81       979        99
VIS    2025250    183200   21.3100  148.2200       9.7        79       953        98
VIS    2025250    183200   21.3100  148.2100       9.4        78       933        96
VIS    2025250    183200   21.3200  148.1900       8.7        79       897        94
VIS    2025250    183200   21.3000  148.1500       8.7        80       899        94
VIS    2025250    183200   21.3200  148.1400       8.7        82       899        97
VIS    2025250    183200   21.3200  148.1200       8.5        85       905        97
VIS    2025250    183200   21.3200  148.0800       7.7        76       926        90
VIS    2025250    183200   21.3000  148.0600       7.8        76       899        91
VIS    2025250    183200   21.3100  148.0300       8.5        88       886        95
VIS    2025250    183200   21.3100  148.0100       9.2        96       885        93
VIS    2025250    183200   21.3100  147.9900       9.0        97       883        95
VIS    2025250    183200   21.3100  147.9600       8.8        96       886        99
VIS    2025250    183200   21.3200  147.9400       8.7        99       893        98
VIS    2025250    183200   21.3100  147.9000       8.2       102       882        91
VIS    2025250    183200   21.3200  147.8900       8.1       102       880        93
VIS    2025250    183200   21.3000  147.6800       7.5       113       725        97
VIS    2025250    183200   21.2900  147.6500       5.7       105       763        95
VIS    2025250    183200   21.3000  147.6300       7.1       109       740        97
VIS    2025250    183200   21.3000  147.6100       7.4       107       726        94
VIS    2025250    183200   21.3000  147.5700       7.6       108       726        93
VIS    2025250    183200   21.3100  147.5400       7.5       107       735        97
VIS    2025250    183200   21.3100  147.5200       7.5       106       745        98
VIS    2025250    183200   21.3000  147.5100       7.5       107       745        97
VIS    2025250    183200   21.3100  147.4900       7.7       108       745        98
VIS    2025250    183200   21.3000  147.4600       7.5       105       720        92
VIS    2025250    183200   21.3100  147.2700       9.4        93       797        90
VIS    2025250    183200   21.3100  147.2600       9.2        94       797        91
VIS    2025250    183200   21.3000  147.0900      13.4        76       988        97
VIS    2025250    183200   21.3000  147.0700      13.6        76       986        96
VIS    2025250    183200   21.3100  147.0600      13.6        76       982        98
VIS    2025250    183200   21.2900  147.0300       9.4        75       998        94
VIS    2025250    183200   21.2900  146.9900       9.5        83       957        95
VIS    2025250    183200   21.3000  146.9200      10.5        93       963        92
VIS    2025250    183200   21.3100  146.9100      10.6        92       963        93
VIS    2025250    183200   21.3100  146.8900      10.7        88       949        91
VIS    2025250    183200   21.3000  146.7700      11.4        85       918        97
VIS    2025250    183200   21.3000  146.7500      11.4        86       921        98
VIS    2025250    183200   21.2900  146.7300      11.2        88       909        97
VIS    2025250    183200   21.2900  146.6900      12.9        81       901        97
VIS    2025250    183200   21.3000  146.6800      13.0        80       904        96
VIS    2025250    183200   21.3000  146.6500      12.5        86       897        97
VIS    2025250    183200   21.3000  146.6300      12.8        82       914        97
VIS    2025250    183200   21.3000  146.6000      13.4        76       949        94
VIS    2025250    183200   21.2900  146.3700      11.7        79       931        95
VIS    2025250    183200   21.2900  146.3500      12.1        78       892        91
VIS    2025250    183200   21.2800  146.3100      12.7        76       884        92
VIS    2025250    183200   21.2900  146.3100      12.7        75       884        92
VIS    2025250    183200   21.3000  146.2900      13.4        75       894        91
VIS    2025250    183200   21.2800  146.1600      12.4        89       855        90
VIS    2025250    183200   21.2900  146.1500      11.9        90       856        90
VIS    2025250    183200   21.2800  145.9900      15.3        77       890        90
VIS    2025250    183200   21.2900  145.9800      15.0        78       886        90
VIS    2025250    183200   21.2900  145.9600      15.3        77       888        90
VIS    2025250    183200   21.2900  145.9400      15.7        79       903        91
VIS    2025250    183200   21.2900  145.9000      15.6        81       909        93
VIS    2025250    183200   21.2900  145.8800      16.0        81       905        92
VIS    2025250    183200   21.2800  145.8600      16.6        82       899        90
VIS    2025250    183200   21.2700  145.8200      14.1        86       895        95
VIS    2025250    183200   21.2800  145.7900      12.0        90       895        96
VIS    2025250    183200   21.2900  145.7900      11.3        90       886        97
VIS    2025250    183200   21.2700  143.2800      14.3        82       911        92
VIS    2025250    183200   21.2600  143.2400      13.3        85       905        92
VIS    2025250    183200   21.2700  143.2300      12.1        88       911        95
VIS    2025250    183200   21.2600  143.1900      11.6        91       919        99
VIS    2025250    183200   21.2500  143.1700      12.4        92       918        97
VIS    2025250    183200   21.2700  143.1400      12.5        94       918        94
VIS    2025250    183200   21.2500  142.9900      13.0        94       906        92
VIS    2025250    183200   21.2500  142.8100      10.5        89       960        98
VIS    2025250    183200   21.2600  142.7600      10.7        89       977        95
VIS    2025250    183200   21.2600  142.7500      10.0        91       963        95
VIS    2025250    183200   21.2600  142.7300       9.6        92       946        95
VIS    2025250    183200   21.2500  142.7000       9.9        94       931        96
VIS    2025250    183200   21.2700  142.6700      11.3        99       932        94
VIS    2025250    183200   21.2700  142.6600      10.9       100       932        94
VIS    2025250    183200   21.2700  142.6300       8.7       104       930        94
VIS    2025250    183200   21.2500  142.6100       8.6       101       928        90
VIS    2025250    183200   21.2500  142.5700      10.2       106       926        92
VIS    2025250    183200   21.2600  142.5400       9.8       108       929        91
VIS    2025250    183200   21.2600  142.5300      10.0       107       931        93
VIS    2025250    183200   21.2700  142.5100      10.2       108       932        90
VIS    2025250    183200   21.2600  142.4200       9.0       106       932        91
VIS    2025250    183200   21.2600  142.4000       9.2       107       931        92
VIS    2025250    183200   21.2600  142.3900       8.5       107       931        91
VIS    2025250    183200   21.3300  151.8500       6.4        73       982        95
VIS    2025250    183200   21.3400  151.8200       5.8        73       953        98
VIS    2025250    183200   21.3400  151.8100       5.7        76       912        98
VIS    2025250    183200   21.3500  151.7700       6.0        85       917        95
VIS    2025250    183200   21.3500  151.7700       6.0        85       920        94
VIS    2025250    183200   21.3300  151.6400       5.8        80       973        94
VIS    2025250    183200   21.3300  151.6300       6.1        79       973        92
VIS    2025250    183200   21.2900  149.4800      10.2        80       943        90
VIS    2025250    183200   21.2900  149.4700      10.6        80       931        91
VIS    2025250    183200   21.2900  149.1000      11.0        87       935        90
VIS    2025250    183200   21.2900  149.0800      10.8        86       920        90
VIS    2025250    183200   21.3000  149.0500      11.1        81       920        90
VIS    2025250    183200   21.3100  149.0200      11.2        80       919        90
VIS    2025250    183200   21.3000  148.9900      10.5        77       919        91
VIS    2025250    183200   21.3100  148.9800      10.0        77       924        91
VIS    2025250    183200   21.2900  148.9500       9.4        76       939        91
VIS    2025250    183200   21.2900  148.9300       9.6        77       930        93
VIS    2025250    183200   21.2900  148.9000       9.8        75       908        93
VIS    2025250    183200   21.3000  148.8800       9.8        79       904        93
VIS    2025250    183200   21.3000  148.8600       9.4        81       895        94
VIS    2025250    183200   21.3000  148.8200       8.7        79       893        97
VIS    2025250    183200   21.3000  148.7900       8.5        80       895        97
VIS    2025250    183200   21.3000  148.7800       8.6        84       895        96
VIS    2025250    183200   21.3000  148.7400       9.7        86       899        92
VIS    2025250    183200   21.2900  148.7300       9.5        82       902        94
VIS    2025250    183200   21.3000  148.7000       9.9        92       909        94
VIS    2025250    183200   21.2800  148.6600      10.8        94       910        94
VIS    2025250    183200   21.2800  148.6500      10.7        93       906        95
VIS    2025250    183200   21.2900  148.6200      10.2        83       905        98
VIS    2025250    183200   21.2900  148.6100      10.0        82       905        98
VIS    2025250    183200   21.3000  148.5800       9.4        81       908        97
VIS    2025250    183200   21.3000  148.5500       9.0        83       910        99
VIS    2025250    183200   21.2800  148.5300       8.8        84       912        99
VIS    2025250    183200   21.2800  148.4900       9.0        74       913        94
VIS    2025250    183200   21.3000  148.4800       9.4        82       913        94
VIS    2025250    183200   21.2900  148.4500       8.8        71       912        93
VIS    2025250    183200   21.3000  148.4300       8.9        74       911        95
VIS    2025250    183200   21.2900  148.3800       9.9        79       912        97
VIS    2025250    183200   21.2800  148.3600       9.8        77       916        96
VIS    2025250    183200   21.3000  148.3300       9.4        76       930        97
VIS    2025250    183200   21.2800  148.3000       9.2        79       946       100
VIS    2025250    183200   21.2900  148.2600      10.1        75       957        97
VIS    2025250    183200   21.2800  148.2500      10.3        73       959        95
VIS    2025250    183200   21.2800  148.2100       9.8        76       938        95
VIS    2025250    183200   21.2900  148.2000       9.1        77       916        93
VIS    2025250    183200   21.2900  148.1600       8.9        79       906        94
VIS    2025250    183200   21.2900  148.1500       8.7        79       906        95
VIS    2025250    183200   21.2700  148.1200       8.9        82       934        98
VIS    2025250    183200   21.2700  148.0800       8.0        86       901        97
VIS    2025250    183200   21.2900  148.0700       7.8        77       899        93
VIS    2025250    183200   21.2800  148.0300       8.8        79       881        95
VIS    2025250    183200   21.2800  148.0100       8.9        89       881        98
VIS    2025250    183200   21.2900  147.9900       8.7        92       883        98
VIS    2025250    183200   21.2800  147.9600       8.3        93       885        97
VIS    2025250    183200   21.2700  147.9400       8.1        98       885        92
VIS    2025250    183200   21.2700  147.6800       7.1       115       752        94
VIS    2025250    183200   21.2700  147.6700       7.0       115       761        94
VIS    2025250    183200   21.2800  147.6300       6.9       113       732        96
VIS    2025250    183200   21.2700  147.6100       7.4       109       732        93
VIS    2025250    183200   21.2700  147.5900       7.4       108       740        93
VIS    2025250    183200   21.2800  147.5700       7.3       108       730        95
VIS    2025250    183200   21.2800  147.5300       7.2       104       728        92
VIS    2025250    183200   21.2900  147.5100       7.3       104       745        95
VIS    2025250    183200   21.2800  147.4900       7.3       100       745        94
VIS    2025250    183200   21.2700  147.4500       7.5       101       727        91
VIS    2025250    183200   21.2700  147.4500       7.7       100       727        90
VIS    2025250    183200   21.2700  147.2000       7.9        95       730        92
VIS    2025250    183200   21.2800  147.0300      10.3        73       998        92
VIS    2025250    183200   21.2800  147.0100       8.7        76       945        91
VIS    2025250    183200   21.2600  146.9500       9.8        92       976        94
VIS    2025250    183200   21.2600  146.9300       9.9        88       950        92
VIS    2025250    183200   21.2800  146.9200      10.0        89       963        93
VIS    2025250    183200   21.2600  146.8700       9.3        89       916        91
VIS    2025250    183200   21.2600  146.8700       9.2        88       916        90
VIS    2025250    183200   21.2600  146.8200      10.8        77       913        96
VIS    2025250    183200   21.2600  146.8100      11.4        77       916        96
VIS    2025250    183200   21.2600  146.7900      11.5        81       915        96
VIS    2025250    183200   21.2800  146.7600      11.5        87       915        96
VIS    2025250    183200   21.2700  146.7300      11.2        89       909        96
VIS    2025250    183200   21.2700  146.7100      11.8        86       904        96
VIS    2025250    183200   21.2800  146.6900      12.7        83       901        98
VIS    2025250    183200   21.2700  146.6100      12.5        78       949        91
VIS    2025250    183200   21.2700  146.3000      13.8        79       894        91
VIS    2025250    183200   21.2600  145.9800      15.5        73       903        90
VIS    2025250    183200   21.2500  145.9700      15.9        72       920        90
VIS    2025250    183200   21.2600  145.9400      16.0        79       917        92
VIS    2025250    183200   21.2700  145.9100      15.7        82       910        90
VIS    2025250    183200   21.2500  145.8500      16.0        84       895        91
VIS    2025250    183200   21.2600  145.8400      15.6        83       895        92
VIS    2025250    183200   21.2700  145.8100      13.9        86       895        95
VIS    2025250    183200   21.2700  145.7900      12.7        89       890        94
VIS    2025250    183200   21.2200  143.0300      11.2        98       842        91
VIS    2025250    183200   21.2300  143.0100      11.3       103       846        93
VIS    2025250    183200   21.2200  142.7700      11.3        80       946        94
VIS    2025250    183200   21.2300  142.7600      10.7        86       960        95
VIS    2025250    183200   21.2400  142.7400       9.8        92       945        95
VIS    2025250    183200   21.2400  142.7100       9.8        93       885        95
VIS    2025250    183200   21.2400  142.6900       9.8        94       929        95
VIS    2025250    183200   21.2300  142.6000       9.3       102       844        92
VIS    2025250    183200   21.2400  142.5800       9.9       105       925        91
VIS    2025250    183200   21.2400  142.5500      10.0       110       926        90
VIS    2025250    183200   21.2300  142.4700       9.0       112       849        93
VIS    2025250    183200   21.2300  142.4200       9.2       108       850        93
VIS    2025250    183200   21.3000  151.8200       6.1        77       899        93
VIS    2025250    183200   21.3200  151.8100       5.7        80       899        96
VIS    2025250    183200   21.3200  151.6400       5.8        79       973        94
VIS    2025250    183200   21.3200  151.6300       6.0        80       973        94
VIS    2025250    183200   21.3200  151.6000       6.8        70       965        90
VIS    2025250    183200   21.2800  148.9700       9.7        76       939        90
VIS    2025250    183200   21.2700  148.9500       9.6        76       943        93
VIS    2025250    183200   21.2800  148.9200       9.8        75       916        93
VIS    2025250    183200   21.2600  148.9100      10.3        76       910        91
VIS    2025250    183200   21.2600  148.8400       9.1        84       891        91
VIS    2025250    183200   21.2700  148.8300       8.6        83       891        93
VIS    2025250    183200   21.2700  148.8100       8.8        82       891        95
VIS    2025250    183200   21.2700  148.7700       8.8        84       894        92
VIS    2025250    183200   21.2700  148.7500       8.4        83       895        94
VIS    2025250    183200   21.2800  148.7100       9.6        75       913        97
VIS    2025250    183200   21.2700  148.6600      10.7        89       910        96
VIS    2025250    183200   21.2600  148.6400      10.6        87       906        97
VIS    2025250    183200   21.2600  148.6300      10.5        87       904        97
VIS    2025250    183200   21.2700  148.6000       9.8        86       904        98
VIS    2025250    183200   21.2500  148.5700       9.2        85       904       100
VIS    2025250    183200   21.2600  148.5400       8.7        82       910        99
VIS    2025250    183200   21.2500  148.5300       8.7        80       911        99
VIS    2025250    183200   21.2600  148.5100       8.9        76       913        95
VIS    2025250    183200   21.2600  148.4800       9.5        68       913        92
VIS    2025250    183200   21.2600  148.4500       9.7        70       912        95
VIS    2025250    183200   21.2500  148.4300       9.6        76       910        96
VIS    2025250    183200   21.2700  148.3900       9.4        81       912        96
VIS    2025250    183200   21.2600  148.3800       9.5        80       912        95
VIS    2025250    183200   21.2700  148.2900       9.0        78       953        99
VIS    2025250    183200   21.2500  148.2600      10.1        70       957        90
VIS    2025250    183200   21.2700  148.2400      10.4        71       959        93
VIS    2025250    183200   21.2700  148.2200      10.0        74       955        94
VIS    2025250    183200   21.2600  148.2000      10.1        73       938        95
VIS    2025250    183200   21.2500  148.1800       9.9        75       930        96
VIS    2025250    183200   21.2500  148.1500       9.7        79       918        97
VIS    2025250    183200   21.2600  148.1300       9.2        80       931        97
VIS    2025250    183200   21.2700  148.0800       7.9        87       901        95
VIS    2025250    183200   21.2700  148.0800       7.9        86       901        95
VIS    2025250    183200   21.2500  148.0400       8.7        71       882        94
VIS    2025250    183200   21.2500  148.0100       8.8        80       882        98
VIS    2025250    183200   21.2600  148.0000       8.8        83       882        97
VIS    2025250    183200   21.2500  147.9800       8.6        91       880        98
VIS    2025250    183200   21.2700  147.9400       8.1        99       883        92
VIS    2025250    183200   21.2500  147.8800       7.2       115       715        90
VIS    2025250    183200   21.2500  147.6400       7.3       113       761        97
VIS    2025250    183200   21.2600  147.6200       7.3       112       740        94
VIS    2025250    183200   21.2600  147.5900       7.5       107       745        93
VIS    2025250    183200   21.2600  147.5700       7.3       105       749        96
VIS    2025250    183200   21.2600  147.5300       7.0       105       736        93
VIS    2025250    183200   21.2500  147.5000       7.7        94       754        93
VIS    2025250    183200   21.2500  147.5000       7.9        91       796        94
VIS    2025250    183200   21.2500  147.4500       7.8        94       796        93
VIS    2025250    183200   21.2600  147.4400       7.8        98       758        93
VIS    2025250    183200   21.2600  147.2000       7.7        99       730        96
VIS    2025250    183200   21.2400  147.1800       8.4       102       842        97
VIS    2025250    183200   21.2500  146.9900       8.9        95       932        91
VIS    2025250    183200   21.2400  146.9600       9.8        92       965        93
VIS    2025250    183200   21.2600  146.9300       9.9        88       950        92
VIS    2025250    183200   21.2400  146.9100      10.6        83       916        92
VIS    2025250    183200   21.2500  146.8800       9.2        88       916        91
VIS    2025250    183200   21.2300  146.8500       9.4        85       916        93
VIS    2025250    183200   21.2400  146.8300      10.7        78       913        96
VIS    2025250    183200   21.2400  146.8100      11.4        79       913        93
VIS    2025250    183200   21.2500  146.8000      11.6        80       915        97
VIS    2025250    183200   21.2400  146.7700      11.9        83       914        94
VIS    2025250    183200   21.2400  146.7500      11.5        86       909        95
VIS    2025250    183200   21.2500  146.7100      11.7        87       906        94
VIS    2025250    183200   21.2300  146.7000      11.9        86       905        91
VIS    2025250    183200   21.2500  146.6100      12.4        75       957        92
VIS    2025250    183200   21.2400  146.2000      14.6        75       880        92
VIS    2025250    183200   21.2300  146.1900      13.7        75       880        91
VIS    2025250    183200   21.2400  146.0500      15.6        84       885        92
VIS    2025250    183200   21.2400  146.0400      15.5        82       888        93
VIS    2025250    183200   21.2200  146.0000      16.0        76       907        92
VIS    2025250    183200   21.2300  145.9900      15.8        74       907        93
VIS    2025250    183200   21.2400  145.9600      15.9        74       920        90
VIS    2025250    183200   21.2400  145.9300      16.1        79       917        90
VIS    2025250    183200   21.2300  145.8900      16.0        83       905        94
VIS    2025250    183200   21.2400  145.8600      16.2        84       895        93
VIS    2025250    183200   21.2300  145.8300      15.9        82       900        93
VIS    2025250    183200   21.2400  145.8100      15.1        84       895        94
VIS    2025250    183200   21.2200  145.7800      13.6        87       895        93
VIS    2025250    183200   21.2300  145.7700      14.0        87       895        94
VIS    2025250    183200   21.2000  143.2700      10.4        94       791        90
VIS    2025250    183200   21.2000  143.1600      11.5        97       806        90
VIS    2025250    183200   21.2000  143.0000       9.9        95       808        90
VIS    2025250    183200   21.2200  142.7800      11.2        79       946        91
VIS    2025250    183200   21.2100  142.7700      11.3        82       927        92
VIS    2025250    183200   21.2200  142.7400      10.4        90       885        92
VIS    2025250    183200   21.2000  142.6400       9.3       103       838        92
VIS    2025250    183200   21.2200  142.5800      10.7       106       841        93
VIS    2025250    183200   21.2200  142.5700      10.9       106       841        93
VIS    2025250    183200   21.2000  142.5400       9.8       105       844        94
VIS    2025250    183200   21.2000  142.5200       9.0       109       844        97
VIS    2025250    183200   21.2000  142.4900       8.8       107       844        97
VIS    2025250    183200   21.2000  142.4700       8.9       105       845        95
VIS    2025250    183200   21.2100  142.4400       8.8       106       849        94
VIS    2025250    183200   21.2000  142.4200       8.6       103       850        93
VIS    2025250    183200   21.2000  142.3900       7.8       104       845        92
VIS    2025250    183200   21.3000  151.7900       5.5        76       889        94
VIS    2025250    183200   21.2900  151.7700       5.2        75       927        91
VIS    2025250    183200   21.2700  151.6200       6.1        83       973        96
VIS    2025250    183200   21.2600  149.4200      10.2        76       936        91
VIS    2025250    183200   21.2400  149.4100       9.4        74       935        95
VIS    2025250    183200   21.2400  149.3900       8.9        76       935        95
VIS    2025250    183200   21.2600  149.3600      10.3        82       924        91
VIS    2025250    183200   21.2400  149.2800      12.0        83       911        90
VIS    2025250    183200   21.2300  148.9600      11.1        83       932        93
VIS    2025250    183200   21.2400  148.9600      10.9        82       932        93
VIS    2025250    183200   21.2500  148.9200      10.1        77       910        93
VIS    2025250    183200   21.2500  148.8400       9.5        83       891        90
VIS    2025250    183200   21.2400  148.8100       9.5        82       883        93
VIS    2025250    183200   21.2500  148.7800       9.3        84       889        93
VIS    2025250    183200   21.2400  148.6800      10.2        78       915        98
VIS    2025250    183200   21.2500  148.6600      10.7        84       910        97
VIS    2025250    183200   21.2500  148.6400      10.7        86       903        97
VIS    2025250    183200   21.2400  148.6300      10.4        85       902        97
VIS    2025250    183200   21.2500  148.6000       9.8        86       903        97
VIS    2025250    183200   21.2300  148.5700       9.1        84       876        99
VIS    2025250    183200   21.2500  148.5400       8.8        82       906       100
VIS    2025250    183200   21.2500  148.5300       8.7        79       910        99
VIS    2025250    183200   21.2300  148.5000       9.2        74       894        95
VIS    2025250    183200   21.2300  148.4700      10.1        75       894        96
VIS    2025250    183200   21.2300  148.4400      10.0        77       895        95
VIS    2025250    183200   21.2500  148.4200       9.4        77       910        95
VIS    2025250    183200   21.2300  148.3300       9.5        72       927        91
VIS    2025250    183200   21.2400  148.2800       9.7        74       950        94
VIS    2025250    183200   21.2400  148.2400      10.7        67       972        90
VIS    2025250    183200   21.2400  148.2000      10.4        72       938        91
VIS    2025250    183200   21.2400  148.1900      10.2        74       935        94
VIS    2025250    183200   21.2200  148.1500       9.5        82       906        95
VIS    2025250    183200   21.2400  148.1400       9.5        80       918        96
VIS    2025250    183200   21.2300  148.1100       9.4        82       903        94
VIS    2025250    183200   21.2200  148.0800       8.0        89       904        94
VIS    2025250    183200   21.2300  148.0700       7.8        91       903        93
VIS    2025250    183200   21.2200  148.0400       7.9        86       892        98
VIS    2025250    183200   21.2300  148.0000       8.9        83       877        97
VIS    2025250    183200   21.2400  148.0000       8.9        84       880        98
VIS    2025250    183200   21.2400  147.9600       8.5        99       855        99
VIS    2025250    183200   21.2300  147.9300       7.8       103       848        97
VIS    2025250    183200   21.2400  147.9200       7.3       109       796        91
VIS    2025250    183200   21.2200  147.8800       7.3       119       728        97
VIS    2025250    183200   21.2300  147.6800       8.2       115       701        93
VIS    2025250    183200   21.2400  147.6600       8.0       113       734        96
VIS    2025250    183200   21.2200  147.6400       7.9       109       761        92
VIS    2025250    183200   21.2200  147.5100       8.2        96       880        92
VIS    2025250    183200   21.2200  147.4900       9.3        90       880        97
VIS    2025250    183200   21.2200  147.4500       8.4        88       873        94
VIS    2025250    183200   21.2200  147.4400       8.0        88       836        95
VIS    2025250    183200   21.2200  147.2500       8.4        94       702        92
VIS    2025250    183200   21.2100  147.2200       8.4        96       711        95
VIS    2025250    183200   21.2200  147.2000       8.2       103       735        97
VIS    2025250    183200   21.2300  147.1900       8.3       104       735        98
VIS    2025250    183200   21.2100  147.1400       8.5       102       866        92
VIS    2025250    183200   21.2200  147.0100       7.9        94       893        94
VIS    2025250    183200   21.2100  146.9700       9.8        92       926        93
VIS    2025250    183200   21.2100  146.8900      10.9        88       919        93
VIS    2025250    183200   21.2100  146.8700      10.3        86       922        91
VIS    2025250    183200   21.2300  146.8600       9.3        87       916        90
VIS    2025250    183200   21.2100  146.8400       9.9        87       916        92
VIS    2025250    183200   21.2100  146.7800      13.3        74       916        92
VIS    2025250    183200   21.2100  146.7500      12.3        79       914        92
VIS    2025250    183200   21.2300  146.6900      12.0        85       906        91
VIS    2025250    183200   21.2300  146.6900      12.3        84       906        90
VIS    2025250    183200   21.2100  146.6500      14.5        77       934        93
VIS    2025250    183200   21.2200  146.6000      12.8        74       957        94
VIS    2025250    183200   21.2200  146.5700      12.8        80       957        96
VIS    2025250    183200   21.2100  146.5600      12.2        81       956        94
VIS    2025250    183200   21.2100  146.5400      11.5        80       926        90
VIS    2025250    183200   21.2000  146.5100       9.7        78       928        93
VIS    2025250    183200   21.2100  146.4800       9.9        91       910        95
VIS    2025250    183200   21.2000  146.4600       9.7        90       892        97
VIS    2025250    183200   21.2000  146.4200       9.9        83       892        91
VIS    2025250    183200   21.2100  146.4100      10.2        82       892        90
VIS    2025250    183200   21.2100  146.2000      13.2        78       877        90
VIS    2025250    183200   21.2000  146.0400      15.4        70       892        90
VIS    2025250    183200   21.2200  146.0000      15.8        76       903        92
VIS    2025250    183200   21.2100  145.9800      15.8        77       914        94
VIS    2025250    183200   21.2000  145.9600      15.8        81       913        95
VIS    2025250    183200   21.2000  145.9200      16.2        86       910        94
VIS    2025250    183200   21.2200  145.9100      15.8        83       908        95
VIS    2025250    183200   21.2000  145.8700      15.1        82       908        96
VIS    2025250    183200   21.2200  145.8500      15.9        80       900        93
VIS    2025250    183200   21.2000  145.8200      15.0        81       903        93
VIS    2025250    183200   21.2000  145.8100      14.1        81       903        94
VIS    2025250    183200   21.1800  143.2400      10.6        97       790        91
VIS    2025250    183200   21.1800  143.1600      11.8        99       781        91
VIS    2025250    183200   21.1900  142.7700      11.8        90       885        94
VIS    2025250    183200   21.1700  142.7600      11.6        93       893        97
VIS    2025250    183200   21.1800  142.6700      10.2       104       838        94
VIS    2025250    183200   21.1800  142.6600      10.2       104       838        94
VIS    2025250    183200   21.1900  142.6100      10.3        97       841        90
VIS    2025250    183200   21.1700  142.5800      10.0        97       841        91
VIS    2025250    183200   21.1900  142.5600      10.1       101       841        93
VIS    2025250    183200   21.1800  142.5400       9.5       100       844        92
VIS    2025250    183200   21.1900  142.5000       9.1       107       844        96
VIS    2025250    183200   21.1800  142.4900       9.5       104       845        95
VIS    2025250    183200   21.1900  142.4600       9.2       104       845        95
VIS    2025250    183200   21.1900  142.4200       8.5       101       850        92
VIS    2025250    183200   21.1800  142.4000       8.3       105       846        91
VIS    2025250    183200   21.2500  151.6400       6.5        82       979        96
VIS    2025250    183200   21.2400  150.7600       7.2        83       995        92
VIS    2025250    183200   21.2400  150.7400       6.3        72       995        96
VIS    2025250    183200   21.2200  149.4100       9.0        73       927        92
VIS    2025250    183200   21.2400  149.4000       9.0        74       935        94
VIS    2025250    183200   21.2400  149.3900       8.9        75       935        94
VIS    2025250    183200   21.2200  149.3500       9.9        77       900        96
VIS    2025250    183200   21.2100  149.3100      10.9        80       901        94
VIS    2025250    183200   21.2200  149.3100      11.0        79       901        94
VIS    2025250    183200   21.2200  149.2600      10.6        78       917        94
VIS    2025250    183200   21.2100  149.2600      10.5        77       917        94
VIS    2025250    183200   21.2200  148.9700      11.5        83       922        90
VIS    2025250    183200   21.2300  148.9500      11.1        83       922        92
VIS    2025250    183200   21.2300  148.9200       9.7        80       874        90
VIS    2025250    183200   21.2100  148.7400       8.4        95       840        93
VIS    2025250    183200   21.2300  148.7100       8.5        93       899        93
VIS    2025250    183200   21.2200  148.6800       9.9        78       899        99
VIS    2025250    183200   21.2300  148.6600      10.6        78       885        97
VIS    2025250    183200   21.2300  148.6500      10.7        79       885        97
VIS    2025250    183200   21.2000  148.6200      10.3        81       876        98
VIS    2025250    183200   21.2000  148.5900       9.4        83       868        99
VIS    2025250    183200   21.2200  148.5500       9.2        84       884        97
VIS    2025250    183200   21.2100  148.5400       9.2        82       884        93
VIS    2025250    183200   21.2200  148.5000       9.5        75       894        95
VIS    2025250    183200   21.2000  148.5000      10.2        76       893        96
VIS    2025250    183200   21.2000  148.4600       9.9        75       893        96
VIS    2025250    183200   21.2000  148.4500       9.8        74       892        95
VIS    2025250    183200   21.2000  148.4100      10.2        77       887        93
VIS    2025250    183200   21.2000  148.3800      10.4        75       887        92
VIS    2025250    183200   21.2200  148.3500      10.1        72       894        92
VIS    2025250    183200   21.2200  148.3400       9.7        72       905        94
VIS    2025250    183200   21.2000  148.2500      10.6        70       987        90
VIS    2025250    183200   21.2200  148.2100      10.1        74       953        90
VIS    2025250    183200   21.2000  148.1800       9.3        81       908        97
VIS    2025250    183200   21.2100  148.1600       9.2        83       906        94
VIS    2025250    183200   21.2200  148.1400       9.6        81       897        92
VIS    2025250    183200   21.2000  148.1100       9.2        80       897        97
VIS    2025250    183200   21.2200  148.0700       7.9        89       904        96
VIS    2025250    183200   21.2100  148.0700       7.9        88       904        97
VIS    2025250    183200   21.2100  148.0200       8.5        88       882       100
VIS    2025250    183200   21.2200  148.0000       8.8        85       875        96
VIS    2025250    183200   21.2100  147.9900       8.8        85       871        96
VIS    2025250    183200   21.2000  147.9600       8.1        93       849        92
VIS    2025250    183200   21.2000  147.9300       6.4       103       830        91
VIS    2025250    183200   21.2100  147.9100       6.2       106       782        94
VIS    2025250    183200   21.2000  147.7000       8.1       117       723        91
VIS    2025250    183200   21.1900  147.6600       7.8       108       755        90
VIS    2025250    183200   21.1900  147.6400       7.8       106       755        91
VIS    2025250    183200   21.2000  147.6200       7.6       110       790        90
VIS    2025250    183200   21.1900  147.5800       7.6       100       751        93
VIS    2025250    183200   21.2100  147.5700       7.6        93       869        90
VIS    2025250    183200   21.1900  147.5300       7.4        93       819        95
VIS    2025250    183200   21.2000  147.5000       8.3        88       878        93
VIS    2025250    183200   21.2100  147.4900       9.2        88       880        97
VIS    2025250    183200   21.2100  147.4400       8.1        85       841        95
VIS    2025250    183200   21.2100  147.4400       7.9        87       836        95
VIS    2025250    183200   21.1900  147.3100       8.2        92       701        91
VIS    2025250    183200   21.2100  147.2800       8.7        95       718        92
VIS    2025250    183200   21.2000  147.2600       8.6        99       704        93
VIS    2025250    183200   21.2000  147.2200       8.4        94       711        94
VIS    2025250    183200   21.2100  147.1900       8.1       102       735        96
VIS    2025250    183200   21.2000  147.1700       8.1       109       815        90
VIS    2025250    183200   21.2100  147.1400       8.6       102       866        92
VIS    2025250    183200   21.1900  147.0000       8.2        92       926        91
VIS    2025250    183200   21.2000  146.9700       9.7        91       926        93
VIS    2025250    183200   21.2000  146.9600      10.0        91       919        90
VIS    2025250    183200   21.1900  146.9100      10.9        94       919        91
VIS    2025250    183200   21.2000  146.8800      10.6        88       919        93
VIS    2025250    183200   21.2000  146.7400      11.7        81       914        91
VIS    2025250    183200   21.1900  146.7000      12.5        80       909        92
VIS    2025250    183200   21.1800  146.6700      12.9        81       921        91
VIS    2025250    183200   21.2000  146.5700      12.4        83       967        93
VIS    2025250    183200   21.2000  146.5600      12.3        83       957        95
VIS    2025250    183200   21.1900  146.5200       9.9        76       928        92
VIS    2025250    183200   21.1800  146.4900      10.1        81       910        94
VIS    2025250    183200   21.2000  146.4700      10.1        90       895        95
VIS    2025250    183200   21.1800  146.4400       9.7        86       864        91
VIS    2025250    183200   21.2000  146.4200      10.2        81       892        95
VIS    2025250    183200   21.1800  146.3600      13.3        82       850        90
VIS    2025250    183200   21.2000  146.3300      13.6        78       852        90
VIS    2025250    183200   21.2000  146.2100      13.5        79       874        91
VIS    2025250    183200   21.1800  146.1900      14.7        83       874        93
VIS    2025250    183200   21.2000  146.1500      15.7        85       876        90
VIS    2025250    183200   21.1900  146.1300      15.7        85       871        91
VIS    2025250    183200   21.1900  146.1000      13.8        82       871        94
VIS    2025250    183200   21.1900  146.0900      13.4        81       871        94
VIS    2025250    183200   21.1700  146.0400      15.6        65       897        91
VIS    2025250    183200   21.1800  145.9900      15.2        74       908        94
VIS    2025250    183200   21.1900  145.9700      15.6        80       914        95
VIS    2025250    183200   21.1700  145.9600      15.7        85       916        95
VIS    2025250    183200   21.1900  145.9200      16.2        86       910        94
VIS    2025250    183200   21.1900  145.9100      16.1        85       910        95
VIS    2025250    183200   21.1900  145.8700      14.8        80       910        95
VIS    2025250    183200   21.1800  145.8500      13.7        76       910        93
VIS    2025250    183200   21.1900  145.8300      14.5        79       903        95
VIS    2025250    183200   21.1700  145.8100      10.6        91       895        98
VIS    2025250    183200   21.1900  145.7700       9.1        97       854        93
VIS    2025250    183200   21.1700  145.4000      14.4        81       842        90
VIS    2025250    183200   21.1700  145.3800      13.8        81       830        90
VIS    2025250    183200   21.1800  145.2600      10.2       102       819        95
VIS    2025250    183200   21.1700  145.2200      11.5        93       811        91
VIS    2025250    183200   21.1700  145.2100      11.8        93       811        91
VIS    2025250    183200   21.1800  145.1700      13.9        91       789        91
VIS    2025250    183200   21.1600  143.2700      10.4       104       789        92
VIS    2025250    183200   21.1700  143.2500      10.7       100       790        93
VIS    2025250    183200   21.1700  143.2300      11.0        96       790        90
VIS    2025250    183200   21.1600  142.8000      13.8        87       897        91
VIS    2025250    183200   21.1600  142.7800      14.0        89       907        93
VIS    2025250    183200   21.1500  142.7500      13.2        92       917        94
VIS    2025250    183200   21.1700  142.6500      10.9       101       841        91
VIS    2025250    183200   21.1500  142.5200      10.4        97       846        90
VIS    2025250    183200   21.1500  142.3900       9.0       112       846        93
VIS    2025250    183200   21.1500  142.3700       9.7       117       842        96
VIS    2025250    183200   21.2300  151.7700       6.8        77       955        95
VIS    2025250    183200   21.2300  151.7700       6.9        78       955        95
VIS    2025250    183200   21.2200  151.6300       6.4        80       979        91
VIS    2025250    183200   21.2100  150.8100       5.4        87       986        96
VIS    2025250    183200   21.2100  150.7900       5.6        87       986        95
VIS    2025250    183200   21.2100  150.7700       5.6        85       987        94
VIS    2025250    183200   21.2100  150.7300       6.0        74       987        99
VIS    2025250    183200   21.2100  150.7200       5.3        72       983        99
VIS    2025250    183200   21.2000  149.4300       9.1        73       952        92
VIS    2025250    183200   21.2100  149.4100       9.0        73       926        93
VIS    2025250    183200   21.2100  149.4000       9.0        73       916        91
VIS    2025250    183200   21.1900  149.3700       9.2        76       916        97
VIS    2025250    183200   21.2000  149.3500       9.5        79       902        96
VIS    2025250    183200   21.2100  149.3100      10.9        80       901        94
VIS    2025250    183200   21.2000  149.2800      10.4        76       913        94
VIS    2025250    183200   21.2000  149.2800      10.3        76       911        95
VIS    2025250    183200   21.1900  149.2300      10.4        78       909        94
VIS    2025250    183200   21.1900  149.2100      11.0        80       923        93
VIS    2025250    183200   21.1800  148.7600       9.4        88       804        92
VIS    2025250    183200   21.1800  148.7300       9.3        93       855        96
VIS    2025250    183200   21.1800  148.7200       9.3        93       866        95
VIS    2025250    183200   21.1900  148.6900       9.2        82       875        98
VIS    2025250    183200   21.2000  148.6500      10.4        76       878        97
VIS    2025250    183200   21.2000  148.6200      10.3        80       875        98
VIS    2025250    183200   21.1800  148.6100      10.7        82       870        97
VIS    2025250    183200   21.1800  148.5900       9.6        83       869        99
VIS    2025250    183200   21.1900  148.5500       9.5        84       882        92
VIS    2025250    183200   21.1900  148.5400       9.8        82       890        94
VIS    2025250    183200   21.1800  148.5100      10.9        78       893        94
VIS    2025250    183200   21.2000  148.4900      10.4        77       893        97
VIS    2025250    183200   21.1900  148.4600      10.0        73       893        94
VIS    2025250    183200   21.1900  148.4300      10.1        74       892        92
VIS    2025250    183200   21.2000  148.4100      10.2        77       887        94
VIS    2025250    183200   21.2000  148.3800      10.4        76       887        94
VIS    2025250    183200   21.1800  148.3600      10.4        77       893        96
VIS    2025250    183200   21.1900  148.3300      10.1        78       905        93
VIS    2025250    183200   21.1900  148.3000      10.4        78       936        92
VIS    2025250    183200   21.1900  148.2800      10.7        75       954        96
VIS    2025250    183200   21.1900  148.2500      10.5        73       987        96
VIS    2025250    183200   21.1700  148.2200      10.4        74       969        99
VIS    2025250    183200   21.1800  148.2000      10.1        75       928        99
VIS    2025250    183200   21.1900  148.1700       9.2        81       906        97
VIS    2025250    183200   21.1900  148.1500       9.2        81       890        96
VIS    2025250    183200   21.1700  148.1300       9.2        79       889        97
VIS    2025250    183200   21.1900  148.1100       9.3        78       895        96
VIS    2025250    183200   21.1800  148.0700       8.4        74       910        96
VIS    2025250    183200   21.1700  148.0400       8.3        76       908        96
VIS    2025250    183200   21.1700  148.0200       8.2        82       871        95
VIS    2025250    183200   21.1700  148.0100       8.1        83       871        95
VIS    2025250    183200   21.1900  147.9700       8.3        91       852        93
VIS    2025250    183200   21.1900  147.9600       8.5        94       848        92
VIS    2025250    183200   21.1700  147.9100       5.4       108       742        98
VIS    2025250    183200   21.1700  147.9000       4.7       102       736        93
VIS    2025250    183200   21.1800  147.8500       9.2       125       709        90
VIS    2025250    183200   21.1700  147.8100       8.4       122       729        92
VIS    2025250    183200   21.1700  147.8100       8.2       120       748        94
VIS    2025250    183200   21.1700  147.7700       7.7       101       759        96
VIS    2025250    183200   21.1900  147.7500       7.9       109       748        90
VIS    2025250    183200   21.1700  147.7300       8.4       113       748        92
VIS    2025250    183200   21.1900  147.6800       8.1       112       739        90
VIS    2025250    183200   21.1700  147.6100       7.9       105       755        98
VIS    2025250    183200   21.1700  147.6000       7.8       106       755        98
VIS    2025250    183200   21.1700  147.5800       7.5       103       751        99
VIS    2025250    183200   21.1700  147.5400       7.5        89       748        94
VIS    2025250    183200   21.1900  147.5300       7.4        92       819        94
VIS    2025250    183200   21.1700  147.4900       9.3        76       832        94
VIS    2025250    183200   21.1700  147.4800       9.5        77       841        95
VIS    2025250    183200   21.1700  147.3000       8.1        95       703        90
VIS    2025250    183200   21.1700  147.2400       7.9        91       712        92
VIS    2025250    183200   21.1700  147.2200       8.2        90       743        92
VIS    2025250    183200   21.1700  147.2000       7.6        91       754        92
VIS    2025250    183200   21.1700  147.1800       7.6        98       752        93
VIS    2025250    183200   21.1600  147.1400       9.0        99       767        94
VIS    2025250    183200   21.1600  147.1200       9.1        91       816        94
VIS    2025250    183200   21.1800  147.1000       9.4        95       905        92
VIS    2025250    183200   21.1600  147.0300       9.3        94       955        91
VIS    2025250    183200   21.1700  146.9900       9.8        93       919        90
VIS    2025250    183200   21.1700  146.9800       9.6        93       919        90
VIS    2025250    183200   21.1600  146.9200      11.1        88       910        91
VIS    2025250    183200   21.1600  146.9000      10.7        86       931        91
VIS    2025250    183200   21.1800  146.8200      11.2        81       899        91
VIS    2025250    183200   21.1800  146.7800      12.9        72       936        94
VIS    2025250    183200   21.1800  146.7100      12.2        81       909        97
VIS    2025250    183200   21.1600  146.7000      11.6        86       913        95
VIS    2025250    183200   21.1800  146.6700      12.5        82       940        90
VIS    2025250    183200   21.1600  146.6400      10.4        82       960        91
VIS    2025250    183200   21.1600  146.6100      11.0        83       960        91
VIS    2025250    183200   21.1500  146.5700      11.7        78       918        94
VIS    2025250    183200   21.1500  146.5500      11.6        76       910        97
VIS    2025250    183200   21.1500  146.5100      10.3        79       910        92
VIS    2025250    183200   21.1500  146.5000       9.7        82       907        94
VIS    2025250    183200   21.1500  146.4700      10.9        86       854        90
VIS    2025250    183200   21.1700  146.4500       9.9        87       864        93
VIS    2025250    183200   21.1500  146.4000      12.9        83       850        90
VIS    2025250    183200   21.1700  146.3700      13.5        83       850        90
VIS    2025250    183200   21.1600  146.3500      13.4        81       849        90
VIS    2025250    183200   21.1600  146.2400      14.7        83       874        93
VIS    2025250    183200   21.1600  146.2100      15.5        83       874        92
VIS    2025250    183200   21.1500  146.1800      15.1        82       880        93
VIS    2025250    183200   21.1700  146.1600      15.7        84       882        91
VIS    2025250    183200   21.1700  146.1600      16.0        85       880        91
VIS    2025250    183200   21.1600  146.1300      15.8        82       877        91
VIS    2025250    183200   21.1500  146.0900      14.7        80       877        93
VIS    2025250    183200   21.1500  146.0800      14.3        80       877        93
VIS    2025250    183200   21.1600  146.0400      15.4        68       897        91
VIS    2025250    183200   21.1500  146.0300      15.4        68       903        91
VIS    2025250    183200   21.1500  145.9800      14.6        76       911        95
VIS    2025250    183200   21.1600  145.9700      15.2        84       916        97
VIS    2025250    183200   21.1500  145.9300      15.8        84       917        95
VIS    2025250    183200   21.1600  145.9100      15.8        83       916        95
VIS    2025250    183200   21.1600  145.9100      15.7        82       914        95
VIS    2025250    183200   21.1500  145.8800      15.7        77       916        96
VIS    2025250    183200   21.1500  145.8400      11.7        84       905        99
VIS    2025250    183200   21.1700  145.8100      10.8        91       895        98
VIS    2025250    183200   21.1500  145.7900      14.6        88       877        94
VIS    2025250    183200   21.1400  145.5600      13.4        89       719        90
VIS    2025250    183200   21.1500  145.5600      13.0        90       719        91
VIS    2025250    183200   21.1500  145.2900      11.7        82       847        91
VIS    2025250    183200   21.1600  145.2600      11.0        93       842        94
VIS    2025250    183200   21.1600  145.2500      11.1        91       842        95
VIS    2025250    183200   21.1600  145.2300      11.6        92       817        93
VIS    2025250    183200   21.1600  145.2100      12.0        90       811        90
VIS    2025250    183200   21.1400  143.2600      10.9       102       782        94
VIS    2025250    183200   21.1400  143.2500      11.3       101       782        93
VIS    2025250    183200   21.1400  142.8000      14.0        86       897        90
VIS    2025250    183200   21.1400  142.7800      14.6        89       917        93
VIS    2025250    183200   21.1400  142.7600      13.8        91       927        94
VIS    2025250    183200   21.1400  142.5700      10.3        99       841        90
VIS    2025250    183200   21.1400  142.5600      10.1        99       841        90
VIS    2025250    183200   21.1200  142.4200       9.4       117       837        92
VIS    2025250    183200   21.1200  142.3900       8.8       110       841        96
VIS    2025250    183200   21.1200  142.3900       8.6       109       842        96
VIS    2025250    183200   21.2100  151.7900       6.7        80       941        92
VIS    2025250    183200   21.2100  150.8000       5.1        87       986        96
VIS    2025250    183200   21.2000  150.7300       5.1        73       983        99
VIS    2025250    183200   21.1900  150.7200       4.8        79       977        96
VIS    2025250    183200   21.1900  150.6600       6.7        84       980        91
VIS    2025250    183200   21.1800  149.4500       9.5        74       952        91
VIS    2025250    183200   21.1700  149.4200       9.1        74       952        91
VIS    2025250    183200   21.1600  149.4100       9.2        75       948        91
VIS    2025250    183200   21.1600  149.3700       9.6        77       926        95
VIS    2025250    183200   21.1700  149.3400       9.2        79       918        96
VIS    2025250    183200   21.1700  149.3300       8.9        79       935        94
VIS    2025250    183200   21.1700  149.2900       9.6        78       937        93
VIS    2025250    183200   21.1600  149.2800       9.9        76       926        94
VIS    2025250    183200   21.1700  149.2400      10.6        77       902        93
VIS    2025250    183200   21.1700  149.2200      11.0        77       876        92
VIS    2025250    183200   21.1800  149.2000      10.9        80       923        94
VIS    2025250    183200   21.1700  149.1900      10.6        79       937        95
VIS    2025250    183200   21.1700  149.1600      11.2        85       949        92
VIS    2025250    183200   21.1800  148.9600      10.5        87       851        90
VIS    2025250    183200   21.1600  148.7700       9.8        83       832        93
VIS    2025250    183200   21.1600  148.7400       9.4        88       854        96
VIS    2025250    183200   21.1600  148.7100       9.3        90       867        95
VIS    2025250    183200   21.1700  148.7000       9.2        89       867        94
VIS    2025250    183200   21.1700  148.6800       9.4        81       867        97
VIS    2025250    183200   21.1700  148.6500      10.6        80       870        96
VIS    2025250    183200   21.1700  148.6100      11.0        83       870        96
VIS    2025250    183200   21.1600  148.5900      10.1        78       871        97
VIS    2025250    183200   21.1600  148.5800       9.8        81       871        97
VIS    2025250    183200   21.1500  148.5500      10.0        80       890        93
VIS    2025250    183200   21.1600  148.5300      10.8        81       891        94
VIS    2025250    183200   21.1500  148.5000      10.5        78       893        97
VIS    2025250    183200   21.1500  148.4700      10.3        73       895        94
VIS    2025250    183200   21.1600  148.4500      10.1        72       892        94
VIS    2025250    183200   21.1600  148.4200       9.7        73       891        98
VIS    2025250    183200   21.1500  148.4000      10.3        73       892        98
VIS    2025250    183200   21.1500  148.3600      12.2        76       907        90
VIS    2025250    183200   21.1500  148.3300      11.7        80       925        90
VIS    2025250    183200   21.1500  148.3300      11.5        81       926        92
VIS    2025250    183200   21.1500  148.2900       8.5        84       946        97
VIS    2025250    183200   21.1600  148.2700       8.2        85       959        96
VIS    2025250    183200   21.1500  148.2300       9.5        74       964        98
VIS    2025250    183200   21.1600  148.2100      10.7        70       964        98
VIS    2025250    183200   21.1700  148.1900      10.4        71       912        96
VIS    2025250    183200   21.1500  148.1700      10.4        69       910        94
VIS    2025250    183200   21.1500  148.1300       9.8        75       892        97
VIS    2025250    183200   21.1600  148.1200       9.1        77       892        98
VIS    2025250    183200   21.1500  148.0900       8.8        71       910        97
VIS    2025250    183200   21.1700  148.0500       8.6        73       920        98
VIS    2025250    183200   21.1500  148.0400       8.5        74       914        97
VIS    2025250    183200   21.1500  148.0200       8.7        77       914        96
VIS    2025250    183200   21.1600  147.9200       5.9       109       742        90
VIS    2025250    183200   21.1600  147.8000       7.9       114       759        94
VIS    2025250    183200   21.1500  147.8000       7.8       109       759        95
VIS    2025250    183200   21.1600  147.7700       7.9       100       788        96
VIS    2025250    183200   21.1600  147.7300       8.3       114       765        95
VIS    2025250    183200   21.1500  147.7100       7.2       111       816        90
VIS    2025250    183200   21.1600  147.6900       8.1       109       816        90
VIS    2025250    183200   21.1500  147.6600       7.9        85       857        95
VIS    2025250    183200   21.1400  147.6400       8.5        78       865        94
VIS    2025250    183200   21.1500  147.6100       7.8        95       806        94
VIS    2025250    183200   21.1500  147.5800       7.2       101       751        98
VIS    2025250    183200   21.1500  147.5600       7.1        99       748        97
VIS    2025250    183200   21.1500  147.5500       7.2        95       748        97
VIS    2025250    183200   21.1500  147.5000       8.9        76       814        92
VIS    2025250    183200   21.1500  147.4900       9.3        75       821        93
VIS    2025250    183200   21.1500  147.4700       9.5        82       832        95
VIS    2025250    183200   21.1600  147.2800       7.4        87       704        90
VIS    2025250    183200   21.1500  147.2200       8.2        86       835        94
VIS    2025250    183200   21.1400  147.2000       8.3        90       835        95
VIS    2025250    183200   21.1500  147.1700       7.9        96       752        93
VIS    2025250    183200   21.1500  147.1700       8.0        99       752        94
VIS    2025250    183200   21.1600  147.0900       9.1        91       895        92
VIS    2025250    183200   21.1400  147.0200      10.9        86       951        95
VIS    2025250    183200   21.1500  147.0000      10.9        83       948        93
VIS    2025250    183200   21.1400  146.9900      11.0        81       912        93
VIS    2025250    183200   21.1300  146.9600      11.8        82       905        98
VIS    2025250    183200   21.1400  146.9400      10.6        87       905        91
VIS    2025250    183200   21.1500  146.8000      12.2        75       921        93
VIS    2025250    183200   21.1400  146.7700      12.0        73       931        94
VIS    2025250    183200   21.1400  146.7600      11.5        74       931        96
VIS    2025250    183200   21.1400  146.7400       9.9        83       920        95
VIS    2025250    183200   21.1500  146.6100      10.9        83       960        90
VIS    2025250    183200   21.1300  146.5800      11.0        84       890        97
VIS    2025250    183200   21.1500  146.5500      11.5        77       900        98
VIS    2025250    183200   21.1300  146.5200      11.5        75       890        94
VIS    2025250    183200   21.1500  146.5100      10.6        78       910        93
VIS    2025250    183200   21.1500  146.4100      12.4        85       850        91
VIS    2025250    183200   21.1400  146.3700      13.3        84       850        91
VIS    2025250    183200   21.1500  146.2300      14.6        83       874        93
VIS    2025250    183200   21.1400  146.2100      15.2        80       880        91
VIS    2025250    183200   21.1500  146.1800      15.1        82       882        92
VIS    2025250    183200   21.1300  146.1700      15.0        81       882        90
VIS    2025250    183200   21.1200  146.1200      16.0        81       880        90
VIS    2025250    183200   21.1400  146.1000      15.0        80       877        92
VIS    2025250    183200   21.1400  146.0900      14.9        80       877        92
VIS    2025250    183200   21.1400  146.0500      15.2        76       905        96
VIS    2025250    183200   21.1400  146.0400      15.2        75       905        95
VIS    2025250    183200   21.1400  146.0000      14.8        76       908        95
VIS    2025250    183200   21.1200  145.9700      15.0        78       917        97
VIS    2025250    183200   21.1300  145.9500      15.5        81       917        96
VIS    2025250    183200   21.1300  145.9400      15.6        80       920        95
VIS    2025250    183200   21.1200  145.9200      15.7        84       920        95
VIS    2025250    183200   21.1300  145.8900      15.7        83       916        96
VIS    2025250    183200   21.1400  145.8700      15.8        78       913        96
VIS    2025250    183200   21.1300  145.8300      12.8        85       908        99
VIS    2025250    183200   21.1200  145.8000      15.2        81       908        97
VIS    2025250    183200   21.1200  145.7800      15.7        80       894        94
VIS    2025250    183200   21.1400  145.5600      13.4        89       719        90
VIS    2025250    183200   21.1400  145.5400      12.4        89       724        90
VIS    2025250    183200   21.1300  145.4500      15.0        80       916        96
VIS    2025250    183200   21.1300  145.4500      15.3        80       917        96
VIS    2025250    183200   21.1200  145.4000      15.7        80       874        91
VIS    2025250    183200   21.1400  145.3800      15.0        78       899        95
VIS    2025250    183200   21.1400  145.3700      14.8        78       894        95
VIS    2025250    183200   21.1400  145.2700      11.3        86       827        90
VIS    2025250    183200   21.1100  142.7700      15.1        89       907        92
VIS    2025250    183200   21.1000  142.5600      12.0       104       881        93
VIS    2025250    183200   21.1000  142.5500      11.1       109       848        90
VIS    2025250    183200   21.1000  142.4400       9.6       113       837        93
VIS    2025250    183200   21.1100  142.4100       9.1       114       837        94
VIS    2025250    183200   21.1100  142.4000       8.9       112       837        95
VIS    2025250    183200   21.1600  150.7300       4.5        91       934        92
VIS    2025250    183200   21.1600  150.7300       4.7        90       934        93
VIS    2025250    183200   21.1700  150.6800       6.8        86       980        92
VIS    2025250    183200   21.1400  149.4400       9.1        73       950        92
VIS    2025250    183200   21.1600  149.4100       9.2        75       948        91
VIS    2025250    183200   21.1400  149.3900       9.7        74       938        91
VIS    2025250    183200   21.1600  149.3600       9.5        77       926        95
VIS    2025250    183200   21.1400  149.3400       9.0        76       926        94
VIS    2025250    183200   21.1600  149.3300       8.8        77       943        93
VIS    2025250    183200   21.1600  149.2900       9.3        75       938        93
VIS    2025250    183200   21.1600  149.2800       9.6        75       937        92
VIS    2025250    183200   21.1500  149.2500      10.8        76       920        91
VIS    2025250    183200   21.1400  149.1600      10.1        81       949        95
VIS    2025250    183200   21.1500  149.1500      10.2        82       949        95
VIS    2025250    183200   21.1400  149.1200      10.8        84       950        93
VIS    2025250    183200   21.1600  149.1000      11.1        81       907        90
VIS    2025250    183200   21.1400  148.9300       9.5        83       801        90
VIS    2025250    183200   21.1500  148.7900      10.2        79       839        93
VIS    2025250    183200   21.1300  148.7700       9.4        79       837        95
VIS    2025250    183200   21.1300  148.7400       9.2        83       866        96
VIS    2025250    183200   21.1500  148.7100       9.2        89       867        95
VIS    2025250    183200   21.1300  148.7000       8.8        87       866        96
VIS    2025250    183200   21.1400  148.6700       9.0        84       862        97
VIS    2025250    183200   21.1500  148.6400      10.2        78       862        97
VIS    2025250    183200   21.1300  148.6000      10.0        72       871        92
VIS    2025250    183200   21.1400  148.5800       9.8        77       874        94
VIS    2025250    183200   21.1300  148.5700       9.8        79       876        95
VIS    2025250    183200   21.1500  148.5400      10.1        81       890        94
VIS    2025250    183200   21.1300  148.5100       9.5        79       883        96
VIS    2025250    183200   21.1400  148.4800       9.9        74       893        95
VIS    2025250    183200   21.1300  148.4600      10.2        73       894        94
VIS    2025250    183200   21.1300  148.4300      10.6        77       895        96
VIS    2025250    183200   21.1500  148.4000      10.1        74       892        98
VIS    2025250    183200   21.1300  148.3900      11.0        78       898        95
VIS    2025250    183200   21.1300  148.3300      11.5        79       929        91
VIS    2025250    183200   21.1400  148.3100      10.3        82       932        96
VIS    2025250    183200   21.1300  148.2700       7.2        88       946        94
VIS    2025250    183200   21.1400  148.2500       7.9        83       959        97
VIS    2025250    183200   21.1400  148.2200       9.9        73       970        99
VIS    2025250    183200   21.1300  148.2100      10.9        71       964        96
VIS    2025250    183200   21.1300  148.1800      10.8        68       912        92
VIS    2025250    183200   21.1200  148.1700      10.5        70       899        93
VIS    2025250    183200   21.1400  148.1300       9.8        75       896        97
VIS    2025250    183200   21.1300  148.1000       8.9        73       908        96
VIS    2025250    183200   21.1300  148.0900       8.3        72       941        94
VIS    2025250    183200   21.1200  148.0700       8.6        73       964        91
VIS    2025250    183200   21.1300  148.0300       9.0        75       924        95
VIS    2025250    183200   21.1200  148.0100       9.2        72       918        91
VIS    2025250    183200   21.1400  147.7900       7.8       103       820        90
VIS    2025250    183200   21.1300  147.7600       8.8        97       848        98
VIS    2025250    183200   21.1200  147.7000       7.1       100       841        94
VIS    2025250    183200   21.1200  147.6700       7.3        97       823        91
VIS    2025250    183200   21.1200  147.6600       7.4        94       823        91
VIS    2025250    183200   21.1200  147.6300       9.1        74       872        95
VIS    2025250    183200   21.1200  147.5900       7.3        83       831        92
VIS    2025250    183200   21.1400  147.5800       6.9        98       803        92
VIS    2025250    183200   21.1300  147.5400       7.1        96       750        97
VIS    2025250    183200   21.1400  147.5400       7.4        95       750        96
VIS    2025250    183200   21.1400  147.5100       8.3        84       814        94
VIS    2025250    183200   21.1100  147.2700       7.8        90       730        94
VIS    2025250    183200   21.1100  147.2400       8.1        80       796        93
VIS    2025250    183200   21.1300  147.2200       8.9        87       852        97
VIS    2025250    183200   21.1200  147.2100       8.7        87       852        97
VIS    2025250    183200   21.1300  147.1800       8.3        95       752        94
VIS    2025250    183200   21.1200  147.1600       8.1        98       738        96
VIS    2025250    183200   21.1200  147.1300       8.3        94       752        93
VIS    2025250    183200   21.1100  147.0600       9.8        98       960        90
VIS    2025250    183200   21.1200  147.0300      12.1        82       948        98
VIS    2025250    183200   21.1200  147.0100      11.9        77       948        96
VIS    2025250    183200   21.1300  146.9700      11.9        81       905        96
VIS    2025250    183200   21.1100  146.9400      11.2        81       907        91
VIS    2025250    183200   21.1100  146.8200      12.1        84       906        98
VIS    2025250    183200   21.1300  146.6500       9.1        82       953        90
VIS    2025250    183200   21.1100  146.6200      11.0        80       895        94
VIS    2025250    183200   21.1200  146.6100      11.3        79       904        96
VIS    2025250    183200   21.1100  146.5700      11.3        90       866        97
VIS    2025250    183200   21.1200  146.5600      11.2        86       866        98
VIS    2025250    183200   21.1200  146.5300      12.1        76       866        91
VIS    2025250    183200   21.1200  146.3500      12.8        84       850        92
VIS    2025250    183200   21.1100  146.2500      13.5        74       871        90
VIS    2025250    183200   21.1200  146.2200      13.9        77       880        95
VIS    2025250    183200   21.1100  146.2000      14.3        79       887        95
VIS    2025250    183200   21.1000  146.1800      14.6        80       889        95
VIS    2025250    183200   21.1000  146.1400      15.1        80       892        92
VIS    2025250    183200   21.1200  146.0900      15.9        80       913        91
VIS    2025250    183200   21.1200  146.0700      15.4        78       914        92
VIS    2025250    183200   21.1100  146.0400      15.9        78       913        91
VIS    2025250    183200   21.1000  146.0200      15.9        77       913        93
VIS    2025250    183200   21.1000  146.0100      15.7        76       913        94
VIS    2025250    183200   21.1100  145.9800      14.9        75       925        96
VIS    2025250    183200   21.1100  145.9600      14.9        75       925        95
VIS    2025250    183200   21.1000  145.9200      15.8        83       934        95
VIS    2025250    183200   21.1000  145.9100      15.8        82       934        95
VIS    2025250    183200   21.1200  145.8900      15.8        84       914        95
VIS    2025250    183200   21.1100  145.8400      15.6        79       911        96
VIS    2025250    183200   21.1000  145.8300      16.2        74       908        91
VIS    2025250    183200   21.1000  145.8000      16.3        74       917        94
VIS    2025250    183200   21.1100  145.4700      14.8        82       861        91
VIS    2025250    183200   21.1100  145.4400      15.7        81       916        96
VIS    2025250    183200   21.1100  145.4400      15.7        80       916        96
VIS    2025250    183200   21.0900  142.5800      13.9        96       910        95
VIS    2025250    183200   21.0900  142.5700      12.6       100       910        97
VIS    2025250    183200   21.0800  142.5300      11.1       105       881        92
VIS    2025250    183200   21.0700  142.4500       9.6       100       848        90
VIS    2025250    183200   21.0800  142.4500       9.4       102       842        90
VIS    2025250    183200   21.0700  142.3800       9.0        99       833        91
VIS    2025250    183200   21.0900  142.3700       8.0        96       832        90
VIS    2025250    183200   21.1500  151.7800       8.3        83       964        90
VIS    2025250    183200   21.1600  151.7600       7.4        82       973        93
VIS    2025250    183200   21.1700  151.7600       6.9        77       978        91
VIS    2025250    183200   21.1500  150.7500       4.2        95       934        91
VIS    2025250    183200   21.1500  150.7400       4.4        93       934        93
VIS    2025250    183200   21.1400  150.7100       6.5        89       971        92
VIS    2025250    183200   21.1500  150.6800       7.0        85       989        91
VIS    2025250    183200   21.1200  150.1400       7.8        79       948        94
VIS    2025250    183200   21.1300  149.4300       9.1        72       948        93
VIS    2025250    183200   21.1300  149.4000       9.2        71       943        93
VIS    2025250    183200   21.1200  149.3900       9.3        70       943        93
VIS    2025250    183200   21.1100  149.3700       9.0        70       943        92
VIS    2025250    183200   21.1300  149.3500       9.2        76       926        94
VIS    2025250    183200   21.1300  149.1500      10.0        81       951        94
VIS    2025250    183200   21.1300  149.1400      10.1        82       950        95
VIS    2025250    183200   21.1200  148.7800       9.9        77       826        90
VIS    2025250    183200   21.1300  148.7600       9.4        79       854        96
VIS    2025250    183200   21.1100  148.7400       9.1        79       866        98
VIS    2025250    183200   21.1100  148.6900       8.8        85       866        99
VIS    2025250    183200   21.1000  148.6600       9.0        85       866        99
VIS    2025250    183200   21.1200  148.6500       9.1        82       860        97
VIS    2025250    183200   21.1100  148.6100       9.0        71       868        95
VIS    2025250    183200   21.1100  148.6000       9.4        71       869        95
VIS    2025250    183200   21.1000  148.5700       9.7        79       878        99
VIS    2025250    183200   21.1100  148.5500       9.3        83       880        97
VIS    2025250    183200   21.1100  148.5100       9.0        82       880        98
VIS    2025250    183200   21.1200  148.5000       9.4        79       883        97
VIS    2025250    183200   21.1100  148.4700      10.3        74       888        96
VIS    2025250    183200   21.1200  148.4500      10.8        73       895        95
VIS    2025250    183200   21.1100  148.4200      10.9        79       905        94
VIS    2025250    183200   21.1200  148.3900      11.5        79       909        94
VIS    2025250    183200   21.1200  148.3700      12.0        78       918        90
VIS    2025250    183200   21.1200  148.3300      10.8        79       930        91
VIS    2025250    183200   21.1100  148.2900       7.7        91       930        94
VIS    2025250    183200   21.1200  148.2700       7.0        91       935        93
VIS    2025250    183200   21.1000  148.2500       8.6        99       939        91
VIS    2025250    183200   21.1000  148.2100      10.4        85       975        92
VIS    2025250    183200   21.1200  148.2000      10.9        70       964        97
VIS    2025250    183200   21.1000  148.1600      10.3        75       922        96
VIS    2025250    183200   21.1000  148.1300      10.0        74       902        96
VIS    2025250    183200   21.1000  148.1100       9.0        73       914        92
VIS    2025250    183200   21.1200  148.0900       8.4        72       941        92
VIS    2025250    183200   21.1200  148.0200       9.0        73       924        91
VIS    2025250    183200   21.1100  147.9800       8.8        72       902        95
VIS    2025250    183200   21.1000  147.9500       7.4        84       820        90
VIS    2025250    183200   21.1100  147.8700       7.8       107       740        94
VIS    2025250    183200   21.1000  147.8500       7.7        97       755        97
VIS    2025250    183200   21.1000  147.7600       8.2        94       853        93
VIS    2025250    183200   21.0900  147.7300       6.7        98       850        93
VIS    2025250    183200   21.0900  147.7300       6.6       100       850        93
VIS    2025250    183200   21.1100  147.7000       7.2       101       849        93
VIS    2025250    183200   21.1100  147.6600       7.4        96       823        91
VIS    2025250    183200   21.1100  147.6300       9.0        75       857        94
VIS    2025250    183200   21.0900  147.6000       8.5        81       831        95
VIS    2025250    183200   21.1100  147.5600       7.0        97       775        94
VIS    2025250    183200   21.1100  147.5500       7.0        97       775        95
VIS    2025250    183200   21.1000  147.5100       7.9        99       814        92
VIS    2025250    183200   21.1000  147.4800       8.4        96       790        92
VIS    2025250    183200   21.0900  147.3100       7.6       101       703        95
VIS    2025250    183200   21.1000  147.3000       7.6        98       707        96
VIS    2025250    183200   21.1100  147.2700       7.7        91       730        95
VIS    2025250    183200   21.0900  147.2300       9.1        81       842        92
VIS    2025250    183200   21.1000  147.2300       9.6        84       878        97
VIS    2025250    183200   21.1000  147.1800       9.4       103       752        96
VIS    2025250    183200   21.0900  147.1600       9.0       103       752        96
VIS    2025250    183200   21.1100  147.1400       8.6        96       743        95
VIS    2025250    183200   21.0900  147.1200       8.9        96       840        98
VIS    2025250    183200   21.0800  147.0900       9.3        91       921        93
VIS    2025250    183200   21.1000  147.0700       9.6        91       960        90
VIS    2025250    183200   21.0800  147.0300      11.7        79       951        97
VIS    2025250    183200   21.0900  147.0200      12.0        78       916       100
VIS    2025250    183200   21.1000  146.9900      11.4        84       901        98
VIS    2025250    183200   21.0900  146.9600      11.9        82       903        99
VIS    2025250    183200   21.1000  146.9300      11.3        77       909        91
VIS    2025250    183200   21.0800  146.9100      12.4        74       903        96
VIS    2025250    183200   21.1000  146.8800      11.0        89       895        93
VIS    2025250    183200   21.0900  146.6700       9.2        80       957        90
VIS    2025250    183200   21.1000  146.6300      10.7        82       895        96
VIS    2025250    183200   21.1000  146.6100      11.3        80       878        95
VIS    2025250    183200   21.1000  146.5800      11.6        90       866        97
VIS    2025250    183200   21.0800  146.5700      12.1        90       859        94
VIS    2025250    183200   21.0900  146.5500      11.7        89       859        95
VIS    2025250    183200   21.0900  146.3600      13.6        83       851        92
VIS    2025250    183200   21.0900  146.3500      13.1        83       851        93
VIS    2025250    183200   21.0800  146.2400      13.8        72       885        94
VIS    2025250    183200   21.0900  146.2000      14.0        85       903        98
VIS    2025250    183200   21.0800  146.2000      14.4        85       903        98
VIS    2025250    183200   21.0800  146.1600      15.1        81       900        96
VIS    2025250    183200   21.0900  146.1300      15.2        80       905        93
VIS    2025250    183200   21.0900  146.1200      15.4        80       907        92
VIS    2025250    183200   21.0900  146.0800      15.9        79       913        95
VIS    2025250    183200   21.0800  146.0700      16.0        80       913        95
VIS    2025250    183200   21.0800  146.0300      16.2        79       914        93
VIS    2025250    183200   21.0800  146.0000      15.8        76       917        94
VIS    2025250    183200   21.0900  145.9800      14.9        75       925        95
VIS    2025250    183200   21.0900  145.9800      14.8        74       925        95
VIS    2025250    183200   21.0900  145.9400      15.3        76       951        92
VIS    2025250    183200   21.0700  145.9100      16.1        79       945        95
VIS    2025250    183200   21.0900  145.9000      15.9        83       937        96
VIS    2025250    183200   21.0800  145.8700      16.0        76       916        94
VIS    2025250    183200   21.0900  145.8100      16.3        73       917        94
VIS    2025250    183200   21.0900  145.8000      16.3        74       917        94
VIS    2025250    183200   21.0900  145.7100      16.2        79       917        94
VIS    2025250    183200   21.0900  145.7000      16.2        80       919        94
VIS    2025250    183200   21.0800  145.6800      15.5        83       914        94
VIS    2025250    183200   21.0800  145.4900      13.3        83       866        95
VIS    2025250    183200   21.0800  145.4700      13.6        82       887        97
VIS    2025250    183200   21.0900  145.4500      14.5        81       882        93
VIS    2025250    183200   21.0500  142.5700      11.9        99       899        92
VIS    2025250    183200   21.0600  142.3800       9.3       100       836        93
VIS    2025250    183200   21.1300  151.7600       7.9        77       951        93
VIS    2025250    183200   21.1200  151.7500       7.6        74       930        94
VIS    2025250    183200   21.1200  151.7200       6.7        64       941        97
VIS    2025250    183200   21.1300  151.6900       5.4        66       971        99
VIS    2025250    183200   21.1100  150.9000       5.8        85       971        94
VIS    2025250    183200   21.1100  150.8900       5.9        85       971        93
VIS    2025250    183200   21.1100  150.8700       6.2        85       969        91
VIS    2025250    183200   21.1100  150.8300       6.9        98       934        90
VIS    2025250    183200   21.1100  150.8100       6.7       100       933        90
VIS    2025250    183200   21.1200  150.7800       5.2        95       933        94
VIS    2025250    183200   21.1100  150.7600       4.8        90       904        96
VIS    2025250    183200   21.1200  150.7400       4.5        87       909        96
VIS    2025250    183200   21.1200  150.7100       5.1        85       957        96
VIS    2025250    183200   21.1200  150.6800       5.2        91       975        93
VIS    2025250    183200   21.0900  149.8400       7.7        76       955        92
VIS    2025250    183200   21.0900  149.8200       7.4        80       940        99
VIS    2025250    183200   21.1000  149.8000       7.1        82       924        97
VIS    2025250    183200   21.1000  149.4000       9.0        66       943        92
VIS    2025250    183200   21.1100  149.3700       9.1        68       943        93
VIS    2025250    183200   21.0900  149.2400       8.7        75       975        96
VIS    2025250    183200   21.0900  149.2200       8.5        75       961        97
VIS    2025250    183200   21.0900  149.1900       8.4        77       958        98
VIS    2025250    183200   21.0800  149.0600      10.7        79       927        94
VIS    2025250    183200   21.0900  149.0500      10.4        77       880        93
VIS    2025250    183200   21.0800  148.7600       9.9        76       837        91
VIS    2025250    183200   21.0800  148.7300       9.3        78       865        98
VIS    2025250    183200   21.0800  148.7200       9.1        81       865        98
VIS    2025250    183200   21.0800  148.6800       9.1        86       867        99
VIS    2025250    183200   21.0900  148.6600       9.0        85       866        99
VIS    2025250    183200   21.0900  148.6400       9.0        83       868        99
VIS    2025250    183200   21.0800  148.6200       9.0        79       868        98
VIS    2025250    183200   21.0800  148.5800       9.8        77       876        99
VIS    2025250    183200   21.0800  148.5500       9.5        80       880       100
VIS    2025250    183200   21.0800  148.5300       9.0        82       880        99
VIS    2025250    183200   21.1000  148.5000       9.2        81       880        99
VIS    2025250    183200   21.0900  148.5000       9.5        80       880        99
VIS    2025250    183200   21.0900  148.4500      10.8        77       898        97
VIS    2025250    183200   21.0800  148.4300      10.7        79       908        95
VIS    2025250    183200   21.0800  148.3800      11.1        80       925        93
VIS    2025250    183200   21.1000  148.3700      11.2        81       925        93
VIS    2025250    183200   21.0900  148.3300       9.8        78       938        92
VIS    2025250    183200   21.0900  148.3000       8.8        82       929        96
VIS    2025250    183200   21.0800  148.2800       8.2        92       925        94
VIS    2025250    183200   21.0800  148.2000      10.4        82       980        90
VIS    2025250    183200   21.0900  148.1700      10.1        77       957        93
VIS    2025250    183200   21.0900  148.1700      10.2        76       949        93
VIS    2025250    183200   21.0900  148.1400      10.2        75       922        96
VIS    2025250    183200   21.0900  148.1100       9.3        74       932        93
VIS    2025250    183200   21.0900  148.0000       8.8        70       930        92
VIS    2025250    183200   21.0900  147.9900       8.5        71       926        96
VIS    2025250    183200   21.0700  147.9600       7.9        76       926        92
VIS    2025250    183200   21.0900  147.9400       7.4        99       858        95
VIS    2025250    183200   21.0700  147.9000       8.0       104       814        94
VIS    2025250    183200   21.0700  147.8900       7.9       103       814        92
VIS    2025250    183200   21.0700  147.8600       7.5        99       810        99
VIS    2025250    183200   21.0700  147.8400       8.4       100       833       100
VIS    2025250    183200   21.0800  147.7500       6.9        97       850        90
VIS    2025250    183200   21.0900  147.7200       7.0       103       849        93
VIS    2025250    183200   21.0700  147.7100       7.6       109       836        93
VIS    2025250    183200   21.0700  147.6600       8.3       101       872        91
VIS    2025250    183200   21.0700  147.6400       8.7        95       856        95
VIS    2025250    183200   21.0700  147.6100       8.8        91       819        97
VIS    2025250    183200   21.0800  147.5700       7.5        93       814        95
VIS    2025250    183200   21.0800  147.5500       7.4        98       793        96
VIS    2025250    183200   21.0600  147.5200       8.3       101       790        96
VIS    2025250    183200   21.0600  147.5100       8.4       102       790        96
VIS    2025250    183200   21.0700  147.3500       9.0       104       701        90
VIS    2025250    183200   21.0800  147.3300       8.2       104       702        94
VIS    2025250    183200   21.0800  147.3000       7.5        99       710        96
VIS    2025250    183200   21.0600  147.2700       8.2        92       827        91
VIS    2025250    183200   21.0800  147.2400       8.4        81       842        92
VIS    2025250    183200   21.0700  147.2300       9.5        88       878        93
VIS    2025250    183200   21.0800  147.2100       9.8        91       842        97
VIS    2025250    183200   21.0700  147.1800       9.8       104       776        99
VIS    2025250    183200   21.0800  147.1600       8.9       103       753        96
VIS    2025250    183200   21.0600  147.1200       9.7        78       822        90
VIS    2025250    183200   21.0700  147.1000       9.2        91       882        98
VIS    2025250    183200   21.0600  147.0800       9.5        91       959        92
VIS    2025250    183200   21.0600  147.0400      10.3        85       964        93
VIS    2025250    183200   21.0800  147.0100      11.3        83       905        99
VIS    2025250    183200   21.0800  146.9800      11.5        88       891        98
VIS    2025250    183200   21.0700  146.9200      13.4        68       903        90
VIS    2025250    183200   21.0700  146.8900      12.5        81       901        92
VIS    2025250    183200   21.0800  146.8900      11.8        87       897        92
VIS    2025250    183200   21.0700  146.7900      13.3        71       980        91
VIS    2025250    183200   21.0600  146.7500      11.2        72       994        98
VIS    2025250    183200   21.0600  146.7300      11.5        66       978        98
VIS    2025250    183200   21.0500  146.6900      10.8        64       934        95
VIS    2025250    183200   21.0500  146.6900      10.8        67       934        96
VIS    2025250    183200   21.0600  146.6600      10.1        79       904        99
VIS    2025250    183200   21.0500  146.6300      10.0        94       883        98
VIS    2025250    183200   21.0500  146.6100      10.9        92       875        96
VIS    2025250    183200   21.0700  146.5800      12.1        90       864        95
VIS    2025250    183200   21.0500  146.5600      13.6        81       855        91
VIS    2025250    183200   21.0600  146.5200      12.4        84       846        92
VIS    2025250    183200   21.0500  146.5000      12.7        81       845        90
VIS    2025250    183200   21.0600  146.4200      14.7        83       859        90
VIS    2025250    183200   21.0600  146.4100      14.5        82       859        90
VIS    2025250    183200   21.0700  146.3800      14.7        85       855        90
VIS    2025250    183200   21.0500  146.3600      14.6        83       851        90
VIS    2025250    183200   21.0700  146.2400      14.0        72       897        96
VIS    2025250    183200   21.0500  146.2100      15.1        86       919        97
VIS    2025250    183200   21.0600  146.1800      15.5        84       908        96
VIS    2025250    183200   21.0500  146.1500      15.5        79       905        96
VIS    2025250    183200   21.0600  146.1300      15.3        78       905        95
VIS    2025250    183200   21.0600  146.0900      15.9        80       910        94
VIS    2025250    183200   21.0700  146.0900      15.9        80       911        94
VIS    2025250    183200   21.0600  146.0600      16.3        81       914        94
VIS    2025250    183200   21.0600  146.0300      16.2        80       917        95
VIS    2025250    183200   21.0500  145.9900      15.8        80       920        94
VIS    2025250    183200   21.0600  145.9700      15.2        76       931        94
VIS    2025250    183200   21.0500  145.9600      15.2        76       951        93
VIS    2025250    183200   21.0700  145.9400      15.4        77       959        94
VIS    2025250    183200   21.0700  145.9000      16.3        78       945        96
VIS    2025250    183200   21.0700  145.8900      16.2        76       937        96
VIS    2025250    183200   21.0500  145.8400      15.9        76       916        94
VIS    2025250    183200   21.0500  145.8200      15.5        76       907        93
VIS    2025250    183200   21.0600  145.8000      15.7        74       885        90
VIS    2025250    183200   21.0400  145.7100      15.4        78       894        94
VIS    2025250    183200   21.0400  145.6700      15.1        77       897        96
VIS    2025250    183200   21.0400  145.5800      16.6        75       902        94
VIS    2025250    183200   21.0400  145.5600      16.4        74       899        93
VIS    2025250    183200   21.0600  145.4900      13.8        81       866        93
VIS    2025250    183200   21.0600  144.9800      11.6       105       718        94
VIS    2025250    183200   21.1100  151.8500       8.5        79       959        90
VIS    2025250    183200   21.1000  151.7500       7.5        71       908        90
VIS    2025250    183200   21.1000  151.7400       7.3        69       914        92
VIS    2025250    183200   21.1200  151.7200       6.6        63       941        98
VIS    2025250    183200   21.1000  151.6900       6.0        67       941        94
VIS    2025250    183200   21.1100  151.6700       5.1        60       946        90
VIS    2025250    183200   21.1000  151.3600       7.2        78       961        93
VIS    2025250    183200   21.0900  151.1100       7.7        89       943        90
VIS    2025250    183200   21.0900  151.0000       7.5        74       959        94
VIS    2025250    183200   21.0900  150.9800       6.8        71       943        96
VIS    2025250    183200   21.0900  150.9600       6.7        75       943        96
VIS    2025250    183200   21.0900  150.9400       6.7        79       960        95
VIS    2025250    183200   21.0900  150.9000       6.3        80       971        91
VIS    2025250    183200   21.0800  150.8800       6.0        82       942        91
VIS    2025250    183200   21.0900  150.8500       6.3        89       938        91
VIS    2025250    183200   21.0800  150.8400       6.3        95       934        90
VIS    2025250    183200   21.0900  150.8000       5.8        88       888        98
VIS    2025250    183200   21.0800  150.7900       5.7        84       884        97
VIS    2025250    183200   21.1000  150.7700       4.8        85       893        97
VIS    2025250    183200   21.0900  150.7300       4.1        81       850        94
VIS    2025250    183200   21.0700  149.8200       7.7        79       935       100
VIS    2025250    183200   21.0700  149.8100       7.7        80       935        99
VIS    2025250    183200   21.0800  149.3700       8.8        65       942        91
VIS    2025250    183200   21.0800  149.2400       8.8        75       978        97
VIS    2025250    183200   21.0600  149.2100       9.0        76       927        98
VIS    2025250    183200   21.0700  149.0700      10.7        78       949        91
VIS    2025250    183200   21.0700  149.0500      10.2        75       904        95
VIS    2025250    183200   21.0600  149.0300      10.0        76       880        94
VIS    2025250    183200   21.0800  149.0000      10.3        81       828        90
VIS    2025250    183200   21.0700  148.7700      10.2        76       852        91
VIS    2025250    183200   21.0700  148.7500       9.6        78       865        98
VIS    2025250    183200   21.0600  148.7200       9.2        81       863        99
VIS    2025250    183200   21.0600  148.7100       9.2        82       862        98
VIS    2025250    183200   21.0500  148.6800       9.1        84       862        98
VIS    2025250    183200   21.0500  148.6600       9.1        82       868       100
VIS    2025250    183200   21.0700  148.6400       9.0        81       868        99
VIS    2025250    183200   21.0600  148.5900      10.0        77       874        98
VIS    2025250    183200   21.0700  148.5700      10.1        76       880        98
VIS    2025250    183200   21.0500  148.5400       9.4        77       884       100
VIS    2025250    183200   21.0500  148.5300       9.0        78       885        99
VIS    2025250    183200   21.0500  148.4900       8.7        80       896        94
VIS    2025250    183200   21.0600  148.4700       9.5        83       904        94
VIS    2025250    183200   21.0600  148.4400      10.2        81       919        92
VIS    2025250    183200   21.0700  148.4300      10.6        79       919        92
VIS    2025250    183200   21.0500  148.4100      10.3        79       944        90
VIS    2025250    183200   21.0500  148.3800      10.1        76       944        96
VIS    2025250    183200   21.0700  148.3500      10.5        77       943        97
VIS    2025250    183200   21.0500  148.3100       8.6        79       946        92
VIS    2025250    183200   21.0500  148.3000       8.0        85       940        94
VIS    2025250    183200   21.0500  148.2500       9.2       100       925        92
VIS    2025250    183200   21.0400  148.0000       9.3        71       976        93
VIS    2025250    183200   21.0500  147.9500       7.5        83       948        90
VIS    2025250    183200   21.0600  147.9200       7.4       100       894        93
VIS    2025250    183200   21.0600  147.9000       7.7       102       830        96
VIS    2025250    183200   21.0600  147.8700       7.5        96       822        97
VIS    2025250    183200   21.0400  147.8500       8.4        90       835        98
VIS    2025250    183200   21.0600  147.8200       9.1        96       859        99
VIS    2025250    183200   21.0500  147.7800       7.4        93       859        93
VIS    2025250    183200   21.0500  147.7600       6.8       100       854        91
VIS    2025250    183200   21.0400  147.7500       6.8       104       840        92
VIS    2025250    183200   21.0400  147.7100       7.8       108       810        96
VIS    2025250    183200   21.0400  147.6900       7.8       110       823        90
VIS    2025250    183200   21.0600  147.6600       8.2       102       856        91
VIS    2025250    183200   21.0500  147.6400       8.3        98       835        93
VIS    2025250    183200   21.0500  147.6200       8.4        96       832        93
VIS    2025250    183200   21.0400  147.5800       7.3        99       802        94
VIS    2025250    183200   21.0400  147.5600       7.5        96       802        93
VIS    2025250    183200   21.0400  147.5500       7.6        96       802        93
VIS    2025250    183200   21.0600  147.5200       8.4       100       790        95
VIS    2025250    183200   21.0600  147.3400       8.6       102       706        90
VIS    2025250    183200   21.0400  147.3300       8.2       100       726        90
VIS    2025250    183200   21.0500  147.2600       9.1        90       837        90
VIS    2025250    183200   21.0500  147.2500       9.5        87       847        91
VIS    2025250    183200   21.0600  147.1600       8.7        92       813        93
VIS    2025250    183200   21.0500  147.0300      10.4        84       912        91
VIS    2025250    183200   21.0500  146.9900      10.6        88       905        91
VIS    2025250    183200   21.0300  146.9500      11.9        72       899        98
VIS    2025250    183200   21.0300  146.9400      12.5        70       895        95
VIS    2025250    183200   21.0400  146.9100      12.9        70       895        92
VIS    2025250    183200   21.0500  146.8000      12.8        74       980        90
VIS    2025250    183200   21.0500  146.7600      10.4        72       984        95
VIS    2025250    183200   21.0500  146.7500      10.8        71       984        98
VIS    2025250    183200   21.0400  146.7200      11.4        62       965        97
VIS    2025250    183200   21.0400  146.7000      11.7        61       934        93
VIS    2025250    183200   21.0300  146.6600      12.4        72       886        95
VIS    2025250    183200   21.0300  146.6400      11.5        86       886        99
VIS    2025250    183200   21.0300  146.6200      10.1        97       883        95
VIS    2025250    183200   21.0400  146.5800      13.2        80       864        92
VIS    2025250    183200   21.0300  146.5300       9.8        85       836        91
VIS    2025250    183200   21.0500  146.5200      11.8        85       846        93
VIS    2025250    183200   21.0400  146.4900      13.1        82       846        90
VIS    2025250    183200   21.0400  146.3400      13.6        79       857        91
VIS    2025250    183200   21.0200  146.2500      11.6        90       913        97
VIS    2025250    183200   21.0300  146.2500      11.9        87       913        98
VIS    2025250    183200   21.0200  146.2200      13.8        84       934        97
VIS    2025250    183200   21.0300  146.2000      15.9        83       926        96
VIS    2025250    183200   21.0200  146.1800      16.0        83       910        95
VIS    2025250    183200   21.0300  146.1500      16.0        77       905        95
VIS    2025250    183200   21.0200  146.1300      16.3        73       907        93
VIS    2025250    183200   21.0300  146.1000      16.1        76       908        92
VIS    2025250    183200   21.0300  146.0600      16.2        82       913        94
VIS    2025250    183200   21.0300  146.0300      16.1        80       917        95
VIS    2025250    183200   21.0300  146.0300      16.1        80       917        95
VIS    2025250    183200   21.0300  145.9800      15.9        81       931        95
VIS    2025250    183200   21.0400  145.9700      15.4        79       935        96
VIS    2025250    183200   21.0300  145.9400      15.8        81       968        94
VIS    2025250    183200   21.0400  145.9100      16.6        79       950        96
VIS    2025250    183200   21.0300  145.9000      16.8        79       945        95
VIS    2025250    183200   21.0200  145.8600      16.3        80       923        95
VIS    2025250    183200   21.0400  145.8400      16.0        77       916        94
VIS    2025250    183200   21.0200  145.8200      15.4        77       897        94
VIS    2025250    183200   21.0400  145.5600      16.4        74       905        94
VIS    2025250    183200   21.0400  145.5500      16.4        75       899        94
VIS    2025250    183200   21.0200  145.4200      12.1        94       818        91
VIS    2025250    183200   21.0000  142.7400      12.2        96       836        91
VIS    2025250    183200   21.0900  151.7200       6.6        67       914        91
VIS    2025250    183200   21.0800  151.7100       6.3        68       914        92
VIS    2025250    183200   21.0600  151.1500       7.9        87       911        90
VIS    2025250    183200   21.0600  151.1300       8.0        87       911        90
VIS    2025250    183200   21.0700  151.1000       8.0        85       926        92
VIS    2025250    183200   21.0700  151.0700       7.5        83       926        94
VIS    2025250    183200   21.0700  151.0600       7.2        82       926        95
VIS    2025250    183200   21.0600  151.0100       7.4        74       924        95
VIS    2025250    183200   21.0800  150.9600       6.5        74       943        96
VIS    2025250    183200   21.0800  150.9400       6.7        81       960        94
VIS    2025250    183200   21.0800  150.9300       6.9        81       971        91
VIS    2025250    183200   21.0800  150.8900       6.1        81       958        91
VIS    2025250    183200   21.0600  150.8200       5.5        91       888        96
VIS    2025250    183200   21.0600  150.8000       5.7        82       873        99
VIS    2025250    183200   21.0600  150.7700       5.2        80       869        90
VIS    2025250    183200   21.0500  149.3800       9.2        67       944        90
VIS    2025250    183200   21.0400  149.3700       8.8        68       944        94
VIS    2025250    183200   21.0400  149.0700      10.1        80       952        95
VIS    2025250    183200   21.0300  149.0700      10.2        81       949        95
VIS    2025250    183200   21.0500  149.0200      10.0        78       904        94
VIS    2025250    183200   21.0300  149.0100       9.6        84       904        93
VIS    2025250    183200   21.0300  148.9900       9.8        86       873        91
VIS    2025250    183200   21.0300  148.8000      10.9        77       844        91
VIS    2025250    183200   21.0500  148.7700      10.1        81       878        92
VIS    2025250    183200   21.0300  148.7500       9.6        80       877        98
VIS    2025250    183200   21.0300  148.7200       9.3        77       863        96
VIS    2025250    183200   21.0500  148.7100       9.2        79       862        96
VIS    2025250    183200   21.0400  148.6900       9.2        82       862        98
VIS    2025250    183200   21.0300  148.6600       8.9        82       865        99
VIS    2025250    183200   21.0400  148.6300       9.0        81       866        99
VIS    2025250    183200   21.0500  148.6100       9.3        80       869        99
VIS    2025250    183200   21.0300  148.5700      10.1        74       880        98
VIS    2025250    183200   21.0500  148.5400       9.4        76       892        99
VIS    2025250    183200   21.0500  148.5400       9.2        76       892        99
VIS    2025250    183200   21.0500  148.5000       8.4        80       896        93
VIS    2025250    183200   21.0500  148.4800       8.7        82       908        93
VIS    2025250    183200   21.0200  148.3900      10.2        77       953        97
VIS    2025250    183200   21.0200  148.3800       9.9        78       944        97
VIS    2025250    183200   21.0400  148.3600       9.5        77       943        97
VIS    2025250    183200   21.0300  148.3200       8.8        77       948        94
VIS    2025250    183200   21.0200  148.3000       8.1        84       946        90
VIS    2025250    183200   21.0200  148.2600       8.6        97       927        92
VIS    2025250    183200   21.0400  148.2500       9.1        99       925        91
VIS    2025250    183200   21.0200  148.1100       7.2        77       975        90
VIS    2025250    183200   21.0200  147.9900       9.1        72       978        94
VIS    2025250    183200   21.0200  147.9800       8.8        73       978        96
VIS    2025250    183200   21.0300  147.9400       7.7        86       948        91
VIS    2025250    183200   21.0200  147.9100       6.8        89       892        94
VIS    2025250    183200   21.0200  147.8800       7.3        90       853        94
VIS    2025250    183200   21.0200  147.8500       9.9        81       851        93
VIS    2025250    183200   21.0200  147.8300      10.2        85       856        95
VIS    2025250    183200   21.0200  147.7900       7.1       104       858        96
VIS    2025250    183200   21.0200  147.7700       6.6       106       857        94
VIS    2025250    183200   21.0300  147.7400       7.0       107       821        94
VIS    2025250    183200   21.0300  147.7200       7.2       105       810        95
VIS    2025250    183200   21.0100  147.6100       7.5       103       721        96
VIS    2025250    183200   21.0200  147.5900       7.2        99       736        96
VIS    2025250    183200   21.0300  147.5700       7.2        97       750        94
VIS    2025250    183200   21.0300  147.5600       7.5        95       772        93
VIS    2025250    183200   21.0200  147.3800       9.1        98       702        91
VIS    2025250    183200   21.0200  147.2900       9.2       100       830        90
VIS    2025250    183200   21.0200  147.1700       9.0        78       897        91
VIS    2025250    183200   21.0100  147.1500      10.2        72       897        96
VIS    2025250    183200   21.0100  147.1200      11.3        69       862        90
VIS    2025250    183200   21.0300  147.0900      12.2        75       931        91
VIS    2025250    183200   21.0100  146.9700      11.1        77       905        99
VIS    2025250    183200   21.0200  146.9300      12.6        71       895        96
VIS    2025250    183200   21.0100  146.9200      12.1        75       893        97
VIS    2025250    183200   21.0100  146.8200      12.7        68       991        93
VIS    2025250    183200   21.0300  146.8000      12.6        71       982        92
VIS    2025250    183200   21.0200  146.7800      10.8        58       984        95
VIS    2025250    183200   21.0300  146.7300      11.0        62       965        94
VIS    2025250    183200   21.0000  146.7300      10.3        66       918        93
VIS    2025250    183200   21.0000  146.6900      11.8        76       888        94
VIS    2025250    183200   21.0000  146.6700      12.4        76       879        94
VIS    2025250    183200   21.0200  146.6300      11.5        87       892        97
VIS    2025250    183200   21.0200  146.6100      10.4        93       888        93
VIS    2025250    183200   21.0200  146.6000      10.7        93       888        92
VIS    2025250    183200   21.0100  146.5700      10.5        79       855        93
VIS    2025250    183200   21.0200  146.5300       9.5        84       824        90
VIS    2025250    183200   21.0100  146.3500      14.1        72       879        91
VIS    2025250    183200   21.0100  146.3300      13.8        74       890        93
VIS    2025250    183200   21.0100  146.2900      12.6        79       874        92
VIS    2025250    183200   21.0000  146.2700      12.2        81       886        97
VIS    2025250    183200   21.0200  146.2500      11.6        89       913        97
VIS    2025250    183200   21.0100  146.2300      13.9        82       926        97
VIS    2025250    183200   21.0200  146.1900      15.9        82       923        96
VIS    2025250    183200   21.0100  146.1600      16.0        81       910        95
VIS    2025250    183200   21.0100  146.1400      16.3        76       907        94
VIS    2025250    183200   21.0100  146.1300      16.3        75       908        93
VIS    2025250    183200   21.0000  146.0900      16.1        75       911        91
VIS    2025250    183200   21.0100  146.0800      15.9        76       911        92
VIS    2025250    183200   21.0000  146.0400      16.0        79       917        96
VIS    2025250    183200   21.0000  146.0300      16.0        78       922        96
VIS    2025250    183200   21.0100  146.0000      16.3        77       923        95
VIS    2025250    183200   21.0200  145.9700      16.1        82       967        94
VIS    2025250    183200   21.0100  145.9500      16.0        83       967        94
VIS    2025250    183200   21.0000  145.9200      16.4        82       957        95
VIS    2025250    183200   21.0000  145.8900      16.5        79       937        95
VIS    2025250    183200   21.0000  145.8700      16.3        77       922        94
VIS    2025250    183200   21.0000  145.8200      15.7        76       897        94
VIS    2025250    183200   20.9900  145.6400      16.1        73       944        96
VIS    2025250    183200   21.0000  145.6200      16.1        75       932        95
VIS    2025250    183200   21.0000  145.6000      15.7        77       923        95
VIS    2025250    183200   21.0100  145.5800      15.8        77       919        96
VIS    2025250    183200   20.9900  145.5600      15.6        79       874        91
VIS    2025250    183200   21.0000  145.4000      12.4        94       798        95
VIS    2025250    183200   21.0100  145.3800      12.4        91       802        93
VIS    2025250    183200   21.0100  145.3600      12.9        85       801        90
VIS    2025250    183200   21.0000  145.3100      12.9        88       746        90
VIS    2025250    183200   21.0000  145.3100      13.2        88       746        91
VIS    2025250    183200   21.0500  151.7100       5.8        72       939        99
VIS    2025250    183200   21.0500  151.6700       5.5        74       919        95
VIS    2025250    183200   21.0400  151.2100       8.6        80       940        90
VIS    2025250    183200   21.0500  151.1900       8.2        79       920        92
VIS    2025250    183200   21.0400  151.1600       7.8        81       900        90
VIS    2025250    183200   21.0400  151.1000       8.1        75       887        92
VIS    2025250    183200   21.0500  151.0900       8.2        78       888        92
VIS    2025250    183200   21.0300  150.9000       7.0        86       972        92
VIS    2025250    183200   21.0300  150.8700       6.5        88       953        94
VIS    2025250    183200   21.0500  150.8200       5.3        96       884        92
VIS    2025250    183200   21.0500  150.7900       5.6        85       873        98
VIS    2025250    183200   21.0500  150.7700       5.4        82       873        92
VIS    2025250    183200   21.0100  149.4100       9.1        70       959        91
VIS    2025250    183200   21.0100  149.3900       9.3        70       943        92
VIS    2025250    183200   21.0100  149.3600       8.8        68       944        94
VIS    2025250    183200   21.0300  149.0700      10.1        81       949        95
VIS    2025250    183200   21.0100  149.0400       9.9        84       956        94
VIS    2025250    183200   21.0200  149.0400      10.0        83       944        95
VIS    2025250    183200   21.0300  149.0100       9.5        85       904        92
VIS    2025250    183200   21.0200  148.9700       9.2        84       886        91
VIS    2025250    183200   21.0200  148.7900      10.5        79       864        93
VIS    2025250    183200   21.0000  148.7800      10.8        80       844        91
VIS    2025250    183200   21.0200  148.7500       9.9        80       878        93
VIS    2025250    183200   21.0100  148.7300       9.7        78       864        98
VIS    2025250    183200   21.0000  148.6800       9.1        83       860       100
VIS    2025250    183200   21.0200  148.6600       9.0        84       863        99
VIS    2025250    183200   21.0100  148.6600       8.9        84       863        99
VIS    2025250    183200   21.0000  148.6300       9.2        82       863        98
VIS    2025250    183200   21.0200  148.5900       9.9        77       880        98
VIS    2025250    183200   21.0100  148.5800       9.7        76       880        98
VIS    2025250    183200   21.0000  148.5400       9.1        75       914        95
VIS    2025250    183200   21.0100  148.5200       8.8        72       914        91
VIS    2025250    183200   21.0100  148.4800       9.5        76       933        90
VIS    2025250    183200   21.0000  148.4100      10.2        77       957        97
VIS    2025250    183200   21.0200  148.3900      10.2        77       953        97
VIS    2025250    183200   21.0100  148.3800       9.9        80       940        95
VIS    2025250    183200   21.0000  148.2600       8.8        96       934        91
VIS    2025250    183200   21.0200  148.2500       8.9        94       930        94
VIS    2025250    183200   21.0000  148.1900       9.2        91       977        92
VIS    2025250    183200   21.0000  148.1700       8.7        88       978        92
VIS    2025250    183200   21.0100  148.1200       7.0        77       969        90
VIS    2025250    183200   20.9900  148.0500       8.6        77       926        98
VIS    2025250    183200   21.0000  148.0400       8.9        75       938        98
VIS    2025250    183200   21.0100  148.0100       9.6        70       978        91
VIS    2025250    183200   20.9900  147.9900      10.0        73       972        99
VIS    2025250    183200   21.0000  147.9600       8.4        78       971        96
VIS    2025250    183200   20.9900  147.9400       7.6        81       961        94
VIS    2025250    183200   21.0100  147.9100       6.9        87       896        95
VIS    2025250    183200   20.9900  147.8800       7.9        87       851        92
VIS    2025250    183200   20.9900  147.8700       8.3        86       851        93
VIS    2025250    183200   21.0100  147.8400      10.3        84       856        95
VIS    2025250    183200   21.0000  147.8100       9.4        99       858        97
VIS    2025250    183200   21.0100  147.7800       7.0       105       858        96
VIS    2025250    183200   21.0100  147.7600       6.8       106       857        95
VIS    2025250    183200   21.0100  147.7300       7.4       104       810        94
VIS    2025250    183200   21.0000  147.7200       7.6       101       810        94
VIS    2025250    183200   21.0100  147.6900       7.7       107       758        96
VIS    2025250    183200   21.0100  147.6700       7.8       114       747        91
VIS    2025250    183200   20.9900  147.6300       7.5       113       717        97
VIS    2025250    183200   20.9900  147.6200       7.3       109       714        96
VIS    2025250    183200   21.0100  147.5900       7.1        99       736        94
VIS    2025250    183200   21.0000  147.5200       8.0       104       700        93
VIS    2025250    183200   20.9900  147.4000       9.3        94       702        90
VIS    2025250    183200   20.9900  147.3900       8.9        93       702        90
VIS    2025250    183200   21.0100  147.3600       8.6        98       706        91
VIS    2025250    183200   21.0000  147.3000      10.2       103       851        95
VIS    2025250    183200   21.0000  147.1500      10.1        74       897        94
VIS    2025250    183200   20.9900  147.1300      11.6        72       893        95
VIS    2025250    183200   20.9900  147.1000      13.0        68       893        94
VIS    2025250    183200   20.9900  147.1000      13.1        67       931        98
VIS    2025250    183200   20.9900  147.0000      11.1        76       905        96
VIS    2025250    183200   20.9800  146.9700      11.7        79       907       100
VIS    2025250    183200   21.0000  146.9400      12.2        77       895        99
VIS    2025250    183200   20.9900  146.9100      11.0        85       891        92
VIS    2025250    183200   20.9900  146.8400      12.5        70       977        95
VIS    2025250    183200   21.0000  146.8200      12.5        67       988        93
VIS    2025250    183200   20.9800  146.7900       7.7        54       978        90
VIS    2025250    183200   20.9800  146.7400       9.6        79       899        96
VIS    2025250    183200   20.9800  146.7100      11.3        89       888        99
VIS    2025250    183200   20.9900  146.6800      12.1        81       886        99
VIS    2025250    183200   21.0000  146.6700      12.4        78       879        96
VIS    2025250    183200   20.9800  146.6500      12.4        76       874        92
VIS    2025250    183200   20.9800  146.5900      10.0        87       855        91
VIS    2025250    183200   20.9900  146.5200      10.4        80       817        90
VIS    2025250    183200   20.9900  146.4300      12.9        80       862        92
VIS    2025250    183200   20.9800  146.4100      13.5        80       869        92
VIS    2025250    183200   20.9900  146.3500      13.9        72       890        91
VIS    2025250    183200   20.9900  146.2800      13.2        78       881        92
VIS    2025250    183200   20.9900  146.2700      12.8        78       886        95
VIS    2025250    183200   20.9900  146.2400      12.7        82       913        92
VIS    2025250    183200   20.9900  146.2000      15.6        80       926        95
VIS    2025250    183200   20.9700  146.1800      15.6        80       926        94
VIS    2025250    183200   20.9700  146.1600      15.7        79       926        95
VIS    2025250    183200   20.9900  146.1300      16.0        78       911        93
VIS    2025250    183200   20.9800  146.1200      15.6        79       914        94
VIS    2025250    183200   20.9800  146.0900      16.2        75       911        92
VIS    2025250    183200   20.9800  146.0500      16.2        75       923        94
VIS    2025250    183200   20.9800  146.0300      16.3        78       928        96
VIS    2025250    183200   20.9700  146.0200      16.4        79       928        95
VIS    2025250    183200   20.9700  145.9800      16.2        77       926        95
VIS    2025250    183200   20.9700  145.9700      16.1        77       926        94
VIS    2025250    183200   20.9800  145.9300      16.0        82       941        95
VIS    2025250    183200   20.9900  145.9000      16.2        79       941        96
VIS    2025250    183200   20.9800  145.9000      16.2        78       935        96
VIS    2025250    183200   20.9800  145.8600      15.8        76       917        93
VIS    2025250    183200   20.9900  145.8300      16.2        76       913        93
VIS    2025250    183200   20.9900  145.8200      16.1        75       905        93
VIS    2025250    183200   20.9700  145.6500      15.1        74       930        96
VIS    2025250    183200   20.9700  145.6000      14.9        79       932        99
VIS    2025250    183200   20.9800  145.6000      14.9        79       932        99
VIS    2025250    183200   20.9900  145.5600      15.5        78       874        91
VIS    2025250    183200   20.9900  145.4000      13.0        91       793        93
VIS    2025250    183200   20.9900  145.3700      11.8        92       787        93
VIS    2025250    183200   20.9800  145.3400      11.5        92       746        93
VIS    2025250    183200   20.9800  145.3300      12.1        88       746        91
VIS    2025250    183200   21.0300  151.7500       7.6        69       957        93
VIS    2025250    183200   21.0300  151.7300       6.4        70       931        98
VIS    2025250    183200   21.0300  151.6900       6.1        66       950        96
VIS    2025250    183200   21.0300  151.6800       6.3        63       953        96
VIS    2025250    183200   21.0200  151.2200       8.5        80       928        91
VIS    2025250    183200   21.0300  151.1000       7.9        72       887        90
VIS    2025250    183200   21.0300  151.0700       7.9        73       888        91
VIS    2025250    183200   21.0100  150.9800       8.1        84       976        90
VIS    2025250    183200   21.0200  150.9400       7.6        86       976        90
VIS    2025250    183200   21.0200  150.9200       7.3        87       969        91
VIS    2025250    183200   21.0100  150.9000       6.9        88       953        92
VIS    2025250    183200   21.0100  150.8800       6.8        87       924        95
VIS    2025250    183200   21.0100  150.8500       6.6        85       868        93
VIS    2025250    183200   21.0200  150.8100       5.3        91       865        97
VIS    2025250    183200   21.0100  150.7900       5.4        96       880        95
VIS    2025250    183200   21.0100  149.4100       9.2        71       962        90
VIS    2025250    183200   21.0100  149.3900       9.3        69       943        92
VIS    2025250    183200   21.0000  149.3600       8.9        68       943        94
VIS    2025250    183200   21.0100  149.3400       8.7        70       959        92
VIS    2025250    183200   20.9900  149.3200       8.7        70       963        92
VIS    2025250    183200   20.9800  149.0500       9.7        86       961        92
VIS    2025250    183200   21.0000  149.0300       9.9        84       956        94
VIS    2025250    183200   20.9800  149.0100       9.5        80       937        95
VIS    2025250    183200   20.9800  148.9900       9.0        75       927        97
VIS    2025250    183200   21.0000  148.7900      11.1        80       844        90
VIS    2025250    183200   21.0000  148.7700      10.6        80       864        92
VIS    2025250    183200   20.9800  148.7200      10.2        82       865        98
VIS    2025250    183200   20.9800  148.7000      10.0        81       865        99
VIS    2025250    183200   21.0000  148.6800       9.2        82       860       100
VIS    2025250    183200   20.9900  148.6500       9.1        83       860        99
VIS    2025250    183200   20.9900  148.6200       9.2        81       860        99
VIS    2025250    183200   20.9800  148.6100       9.4        78       866        98
VIS    2025250    183200   20.9900  148.5700       9.3        78       889        97
VIS    2025250    183200   20.9800  148.5500       8.8        83       914        91
VIS    2025250    183200   20.9800  148.5200       9.3        76       927        94
VIS    2025250    183200   20.9800  148.5000      10.2        74       947        93
VIS    2025250    183200   20.9900  148.4200      10.1        77       962        97
VIS    2025250    183200   20.9900  148.3600       9.4        85       928        93
VIS    2025250    183200   20.9800  148.3100       8.4        97       933        90
VIS    2025250    183200   20.9800  148.2700       9.0        96       940        90
VIS    2025250    183200   20.9800  148.2500       8.8        92       965        90
VIS    2025250    183200   20.9900  148.1900       9.3        89       974        94
VIS    2025250    183200   20.9800  148.1600       8.4        82       960        95
VIS    2025250    183200   20.9800  148.1500       7.8        80       957        94
VIS    2025250    183200   20.9700  148.1300       8.1        80       954        96
VIS    2025250    183200   20.9900  148.0900       8.2        73       939        96
VIS    2025250    183200   20.9700  148.0600       9.3        72       918        98
VIS    2025250    183200   20.9700  148.0400       9.7        75       924       100
VIS    2025250    183200   20.9700  148.0100       9.9        74       967        98
VIS    2025250    183200   20.9700  148.0100       9.7        73       967        97
VIS    2025250    183200   20.9700  147.9800       9.4        73       967        93
VIS    2025250    183200   20.9700  147.9600       8.6        76       964        92
VIS    2025250    183200   20.9800  147.9100       6.6        91       896        95
VIS    2025250    183200   20.9900  147.9100       6.7        92       886        96
VIS    2025250    183200   20.9900  147.8800       8.0        87       851        93
VIS    2025250    183200   20.9700  147.8400      10.2        86       857        94
VIS    2025250    183200   20.9700  147.8300      10.1        90       858        97
VIS    2025250    183200   20.9900  147.8000       8.8       107       858        97
VIS    2025250    183200   20.9900  147.7800       7.2       106       859        96
VIS    2025250    183200   20.9700  147.7500       8.0        95       849        96
VIS    2025250    183200   20.9600  147.6600       7.3       105       725        93
VIS    2025250    183200   20.9600  147.6400       7.0       102       725        96
VIS    2025250    183200   20.9800  147.6100       7.2       104       721        95
VIS    2025250    183200   20.9600  147.5800       7.7        97       737        92
VIS    2025250    183200   20.9600  147.4100       9.3       102       705        91
VIS    2025250    183200   20.9700  147.4100       9.3        99       705        91
VIS    2025250    183200   20.9800  147.3600       8.8        99       705        91
VIS    2025250    183200   20.9700  147.3500       9.4       103       709        91
VIS    2025250    183200   20.9700  147.3200      10.3       105       740        91
VIS    2025250    183200   20.9600  147.3000      10.4        96       894        95
VIS    2025250    183200   20.9700  147.2700      10.1        89       969        93
VIS    2025250    183200   20.9800  147.2600       9.5        86       979        91
VIS    2025250    183200   20.9700  147.1400      11.4        78       899        91
VIS    2025250    183200   20.9600  147.1100      12.9        70       874        90
VIS    2025250    183200   20.9700  147.1000      13.3        68       893        92
VIS    2025250    183200   20.9700  147.0600      13.3        66       929        91
VIS    2025250    183200   20.9800  147.0100      11.9        76       882        92
VIS    2025250    183200   20.9600  146.9700      11.9        83       903        95
VIS    2025250    183200   20.9800  146.9400      11.9        79       891        98
VIS    2025250    183200   20.9800  146.8300      12.6        71       988        99
VIS    2025250    183200   20.9700  146.7500       9.1        80       899        93
VIS    2025250    183200   20.9600  146.7100      12.4        89       888        96
VIS    2025250    183200   20.9700  146.6900      12.1        83       888        99
VIS    2025250    183200   20.9500  146.6700      13.5        69       886        93
VIS    2025250    183200   20.9700  146.6500      12.5        74       874        91
VIS    2025250    183200   20.9600  146.6000      10.4        84       869        91
VIS    2025250    183200   20.9600  146.4900      12.4        78       862        90
VIS    2025250    183200   20.9600  146.4400      12.5        77       862        90
VIS    2025250    183200   20.9500  146.4100      13.2        80       872        92
VIS    2025250    183200   20.9500  146.4000      13.2        81       876        91
VIS    2025250    183200   20.9500  146.3600      13.4        75       886        90
VIS    2025250    183200   20.9500  146.3100      13.8        77       890        94
VIS    2025250    183200   20.9500  146.3000      13.7        77       890        93
VIS    2025250    183200   20.9600  146.2300      13.8        82       917        94
VIS    2025250    183200   20.9500  146.1900      14.6        80       932        97
VIS    2025250    183200   20.9500  146.1600      15.7        77       941        94
VIS    2025250    183200   20.9500  146.1400      15.5        77       926        95
VIS    2025250    183200   20.9700  146.1300      15.5        80       917        94
VIS    2025250    183200   20.9600  146.0900      16.2        76       917        93
VIS    2025250    183200   20.9600  146.0800      16.0        76       917        94
VIS    2025250    183200   20.9500  146.0400      15.9        79       932        95
VIS    2025250    183200   20.9700  146.0300      16.4        78       929        95
VIS    2025250    183200   20.9600  145.9900      16.1        77       926        96
VIS    2025250    183200   20.9600  145.9800      16.0        77       926        96
VIS    2025250    183200   20.9700  145.9500      15.7        79       925        95
VIS    2025250    183200   20.9700  145.9300      15.8        80       938        96
VIS    2025250    183200   20.9500  145.9000      15.2        78       929        97
VIS    2025250    183200   20.9600  145.8800      15.0        78       917        97
VIS    2025250    183200   20.9600  145.8500      15.2        78       907        95
VIS    2025250    183200   20.9700  145.8300      16.0        78       892        90
VIS    2025250    183200   20.9600  145.6500      14.9        74       930        95
VIS    2025250    183200   20.9500  145.6300      13.4        83       930        98
VIS    2025250    183200   20.9600  145.6000      14.3        82       919       100
VIS    2025250    183200   20.9600  145.4000      13.1        91       758        90
VIS    2025250    183200   20.9600  145.3800      12.0        96       754        92
VIS    2025250    183200   20.9300  142.3900      11.0       100       815        91
VIS    2025250    183200   21.0200  151.7300       6.9        72       902        94
VIS    2025250    183200   21.0100  151.7000       6.7        69       898        91
VIS    2025250    183200   21.0200  151.6800       6.1        59       939        95
VIS    2025250    183200   20.9900  151.0100       7.5        81       950        93
VIS    2025250    183200   20.9900  150.9900       7.8        82       955        91
VIS    2025250    183200   21.0000  150.9600       7.9        82       969        91
VIS    2025250    183200   20.9900  150.9400       7.1        81       939        93
VIS    2025250    183200   21.0000  150.9200       7.0        84       941        91
VIS    2025250    183200   20.9800  150.8800       7.7        85       899        91
VIS    2025250    183200   21.0000  150.8700       7.1        87       882        93
VIS    2025250    183200   20.9900  150.8400       7.2        83       866        92
VIS    2025250    183200   20.9900  150.8200       6.6        85       868        94
VIS    2025250    183200   20.9900  150.7900       6.1        91       876        95
VIS    2025250    183200   20.9600  149.3700       9.1        69       955        92
VIS    2025250    183200   20.9800  149.3500       8.9        70       945        94
VIS    2025250    183200   20.9700  149.3300       9.0        71       945        94
VIS    2025250    183200   20.9800  149.0400       9.7        85       961        93
VIS    2025250    183200   20.9600  149.0300       9.8        82       961        94
VIS    2025250    183200   20.9600  149.0100      10.0        77       937        95
VIS    2025250    183200   20.9800  148.9700       8.9        73       906        94
VIS    2025250    183200   20.9600  148.9000      10.5        86       853        90
VIS    2025250    183200   20.9500  148.8800      10.5        88       844        92
VIS    2025250    183200   20.9600  148.7400      10.9        82       868        96
VIS    2025250    183200   20.9600  148.7100      10.7        82       868        97
VIS    2025250    183200   20.9700  148.6900      10.0        80       863        98
VIS    2025250    183200   20.9600  148.6800      10.3        80       863        98
VIS    2025250    183200   20.9600  148.6600       9.5        79       857        99
VIS    2025250    183200   20.9500  148.6300       9.1        78       857        99
VIS    2025250    183200   20.9600  148.5800       9.2        83       871        98
VIS    2025250    183200   20.9500  148.5700       9.2        85       889        96
VIS    2025250    183200   20.9500  148.5300       9.0        77       951        94
VIS    2025250    183200   20.9600  148.5300       9.1        77       947        95
VIS    2025250    183200   20.9500  148.5000      10.0        73       947        94
VIS    2025250    183200   20.9600  148.4700      10.1        74       964        92
VIS    2025250    183200   20.9600  148.4400       9.1        82       965        96
VIS    2025250    183200   20.9500  148.4100       9.2        85       967        95
VIS    2025250    183200   20.9600  148.3900       9.4        80       967        96
VIS    2025250    183200   20.9600  148.3500       8.2        85       936        95
VIS    2025250    183200   20.9700  148.2700       8.7        95       955        90
VIS    2025250    183200   20.9700  148.2500       8.6        92       965        90
VIS    2025250    183200   20.9500  148.2200       8.5        88       960        91
VIS    2025250    183200   20.9500  148.1800       8.7        86       959        93
VIS    2025250    183200   20.9500  148.1800       8.7        84       959        93
VIS    2025250    183200   20.9600  148.1300       8.5        81       952        96
VIS    2025250    183200   20.9600  148.1100       9.0        75       939        98
VIS    2025250    183200   20.9400  148.1000       9.2        70       918        98
VIS    2025250    183200   20.9400  148.0800       9.6        67       906        96
VIS    2025250    183200   20.9500  148.0500       9.4        73       916        98
VIS    2025250    183200   20.9500  148.0300       9.2        74       924        96
VIS    2025250    183200   20.9600  147.9900       9.4        73       968        92
VIS    2025250    183200   20.9600  147.9500       8.0        81       928        93
VIS    2025250    183200   20.9600  147.9200       6.8        86       880        95
VIS    2025250    183200   20.9600  147.8800       7.8        89       853        96
VIS    2025250    183200   20.9500  147.8600       8.9        85       856        96
VIS    2025250    183200   20.9400  147.8400       9.3        86       859        95
VIS    2025250    183200   20.9600  147.8300       9.7        93       858        98
VIS    2025250    183200   20.9400  147.7800       7.9        83       859        96
VIS    2025250    183200   20.9400  147.7500       8.1        86       859        96
VIS    2025250    183200   20.9500  147.7500       7.8        90       859        97
VIS    2025250    183200   20.9400  147.7000       7.1       104       738        98
VIS    2025250    183200   20.9400  147.6800       6.9       105       724        97
VIS    2025250    183200   20.9500  147.6600       7.1       104       725        93
VIS    2025250    183200   20.9400  147.6300       6.6        96       737        94
VIS    2025250    183200   20.9400  147.6100       7.0        95       747        91
VIS    2025250    183200   20.9600  147.5800       7.8        98       717        91
VIS    2025250    183200   20.9600  147.5700       8.0       100       717        91
VIS    2025250    183200   20.9400  147.4400       9.2       103       701        91
VIS    2025250    183200   20.9500  147.4000       9.5       105       706        90
VIS    2025250    183200   20.9500  147.3500      10.3       107       747        95
VIS    2025250    183200   20.9600  147.3500      10.0       105       747        95
VIS    2025250    183200   20.9600  147.3100      10.5        95       894        96
VIS    2025250    183200   20.9500  147.2900      10.2        84       970        95
VIS    2025250    183200   20.9400  147.2600      10.0        86       964        94
VIS    2025250    183200   20.9500  147.2300       9.3        92       965        91
VIS    2025250    183200   20.9500  147.2000       9.0        80       946        92
VIS    2025250    183200   20.9400  147.1600      11.2        76       895        98
VIS    2025250    183200   20.9400  147.1500      11.5        80       874        94
VIS    2025250    183200   20.9500  147.0800      13.8        66       901        93
VIS    2025250    183200   20.9500  146.9500      12.1        80       893        90
VIS    2025250    183200   20.9300  146.8800      10.7       103       870        94
VIS    2025250    183200   20.9300  146.8000       9.2        78       936        93
VIS    2025250    183200   20.9300  146.7700      10.1        77       893        98
VIS    2025250    183200   20.9400  146.7500      10.6        81       887        98
VIS    2025250    183200   20.9300  146.7200      13.5        73       879        91
VIS    2025250    183200   20.9500  146.6700      13.6        69       886        91
VIS    2025250    183200   20.9300  146.6300      10.8        84       879        97
VIS    2025250    183200   20.9500  146.6000       9.9        88       869        92
VIS    2025250    183200   20.9400  146.5900       9.8        89       846        93
VIS    2025250    183200   20.9300  146.5600      10.6        80       813        90
VIS    2025250    183200   20.9400  146.5500      10.5        82       813        91
VIS    2025250    183200   20.9400  146.4300      12.8        79       872        93
VIS    2025250    183200   20.9500  146.3800      13.6        76       883        92
VIS    2025250    183200   20.9400  146.3100      13.7        75       890        96
VIS    2025250    183200   20.9300  146.3000      13.3        76       888        92
VIS    2025250    183200   20.9400  146.2600      13.9        77       888        91
VIS    2025250    183200   20.9200  146.2300      14.6        76       907        96
VIS    2025250    183200   20.9300  146.2000      14.4        77       928        97
VIS    2025250    183200   20.9200  146.1900      14.7        77       951        93
VIS    2025250    183200   20.9200  146.1500      15.7        78       962        95
VIS    2025250    183200   20.9400  146.1500      15.5        77       951        96
VIS    2025250    183200   20.9300  146.1100      15.8        80       923        95
VIS    2025250    183200   20.9400  146.0900      15.7        79       920        95
VIS    2025250    183200   20.9200  146.0700      15.4        80       922        94
VIS    2025250    183200   20.9400  146.0500      15.5        80       928        92
VIS    2025250    183200   20.9200  146.0000      16.1        76       922        95
VIS    2025250    183200   20.9200  146.0000      16.3        75       922        94
VIS    2025250    183200   20.9300  145.9600      16.3        74       919        93
VIS    2025250    183200   20.9400  145.9300      15.7        76       925        96
VIS    2025250    183200   20.9300  145.9100      15.4        79       925        94
VIS    2025250    183200   20.9400  145.9000      15.0        79       925        96
VIS    2025250    183200   20.9400  145.8600      13.7        84       848        90
VIS    2025250    183200   20.9400  145.6500      13.4        81       874        94
VIS    2025250    183200   20.9400  145.6100      12.8        90       823        93
VIS    2025250    183200   20.9300  145.5900      12.4        91       787        90
VIS    2025250    183200   20.9200  145.4100      13.7        91       735        90
VIS    2025250    183200   20.9300  145.4000      13.1        92       735        91
VIS    2025250    183200   20.9100  142.5700      10.3        94       801        90
VIS    2025250    183200   20.9100  142.5600      10.2        95       802        90
VIS    2025250    183200   20.8900  142.4000       9.8       105       826        95
VIS    2025250    183200   20.9000  142.3900      10.0       113       823        98
VIS    2025250    183200   20.9000  142.3600      10.1       123       832        95
VIS    2025250    183200   20.9900  151.7500       7.6        74       948        91
VIS    2025250    183200   20.9900  151.7000       7.2        75       937        93
VIS    2025250    183200   20.9800  151.6700       6.3        78       968        98
VIS    2025250    183200   20.9600  151.1000       7.9        78       959        92
VIS    2025250    183200   20.9600  151.0600       6.9        82       958        95
VIS    2025250    183200   20.9600  151.0300       6.9        81       921        96
VIS    2025250    183200   20.9700  151.0200       7.0        78       921        95
VIS    2025250    183200   20.9800  150.9500       7.3        80       953        93
VIS    2025250    183200   20.9700  150.8600       7.8        84       882        90
VIS    2025250    183200   20.9600  149.3700       9.1        70       955        92
VIS    2025250    183200   20.9400  149.3400       9.1        71       944        94
VIS    2025250    183200   20.9500  149.3200       9.0        71       946        94
VIS    2025250    183200   20.9500  149.0500      10.2        82       968        92
VIS    2025250    183200   20.9500  149.0200       9.8        80       965        94
VIS    2025250    183200   20.9400  149.0000      10.2        78       926        95
VIS    2025250    183200   20.9500  148.9800       9.9        75       909        94
VIS    2025250    183200   20.9500  148.9600      10.0        81       898        91
VIS    2025250    183200   20.9500  148.9000      10.4        87       853        91
VIS    2025250    183200   20.9300  148.8700      11.1        87       850        90
VIS    2025250    183200   20.9400  148.8700      11.2        88       844        90
VIS    2025250    183200   20.9300  148.7700      11.2        80       857        90
VIS    2025250    183200   20.9300  148.7300      11.0        77       875        95
VIS    2025250    183200   20.9300  148.7000      11.1        77       873        96
VIS    2025250    183200   20.9300  148.6700      10.6        77       870        97
VIS    2025250    183200   20.9400  148.6500       9.6        79       857        98
VIS    2025250    183200   20.9500  148.6300       9.2        78       857        99
VIS    2025250    183200   20.9500  148.6100       8.9        82       865       100
VIS    2025250    183200   20.9300  148.5700       9.1        83       897        99
VIS    2025250    183200   20.9400  148.5500       9.3        81       951        94
VIS    2025250    183200   20.9300  148.5300       9.5        74       955        96
VIS    2025250    183200   20.9400  148.5000      10.1        72       947        95
VIS    2025250    183200   20.9200  148.4800      10.1        73       937        95
VIS    2025250    183200   20.9400  148.4400       9.0        80       965        96
VIS    2025250    183200   20.9400  148.4400       9.0        82       958        96
VIS    2025250    183200   20.9300  148.3900       8.4        81       943        96
VIS    2025250    183200   20.9300  148.3900       8.5        81       946        96
VIS    2025250    183200   20.9300  148.3600       8.6        76       956        94
VIS    2025250    183200   20.9400  148.2800       8.3        89       940        94
VIS    2025250    183200   20.9300  148.2600       7.5        80       955        94
VIS    2025250    183200   20.9400  148.2200       8.7        90       960        90
VIS    2025250    183200   20.9200  148.1400       8.6        74       886        90
VIS    2025250    183200   20.9400  148.1200       9.1        76       908        98
VIS    2025250    183200   20.9400  148.0900       9.3        69       908        96
VIS    2025250    183200   20.9200  147.9800       9.2        78       964        90
VIS    2025250    183200   20.9200  147.9500       9.5        83       873        95
VIS    2025250    183200   20.9300  147.9300       7.9        86       871        94
VIS    2025250    183200   20.9400  147.9000       6.6        85       858        91
VIS    2025250    183200   20.9300  147.8700       8.3        82       857        93
VIS    2025250    183200   20.9300  147.8400       9.0        86       860        95
VIS    2025250    183200   20.9300  147.8300       8.9        88       860        94
VIS    2025250    183200   20.9200  147.8000       8.0        89       857        94
VIS    2025250    183200   20.9400  147.7700       8.2        82       859        96
VIS    2025250    183200   20.9200  147.7400       8.3        92       826        93
VIS    2025250    183200   20.9300  147.7300       7.9       100       825        95
VIS    2025250    183200   20.9300  147.7000       6.9       104       724        98
VIS    2025250    183200   20.9200  147.6600       6.1       104       724        98
VIS    2025250    183200   20.9300  147.6400       6.5        99       731        97
VIS    2025250    183200   20.9200  147.6300       6.5       100       737        97
VIS    2025250    183200   20.9200  147.5900       8.1       104       717        94
VIS    2025250    183200   20.9200  147.5600       8.5       108       704        92
VIS    2025250    183200   20.9200  147.4700       8.1       107       702        95
VIS    2025250    183200   20.9300  147.4500       8.7       101       701        93
VIS    2025250    183200   20.9300  147.4000       9.8       102       712        90
VIS    2025250    183200   20.9300  147.3800      10.1       105       713        90
VIS    2025250    183200   20.9100  147.3500      10.7       101       889        95
VIS    2025250    183200   20.9100  147.3100       9.8        91       975        92
VIS    2025250    183200   20.9200  147.3000      10.0        87       975        93
VIS    2025250    183200   20.9100  147.2700      10.5        88       947        94
VIS    2025250    183200   20.9100  147.2400      10.1        93       951        91
VIS    2025250    183200   20.9100  147.2300       9.9        93       951        91
VIS    2025250    183200   20.9100  147.1900       9.6        85       921        96
VIS    2025250    183200   20.9200  147.1700      10.5        83       895        92
VIS    2025250    183200   20.9200  147.1500      10.3        93       862        91
VIS    2025250    183200   20.9100  147.1200       9.8        95       866        97
VIS    2025250    183200   20.9200  147.1000      11.4        81       884        91
VIS    2025250    183200   20.9200  147.0700      12.8        77       868        93
VIS    2025250    183200   20.9200  147.0000      11.8        84       868        91
VIS    2025250    183200   20.9200  146.8900      10.4       107       844        95
VIS    2025250    183200   20.9300  146.8800      10.7       108       870        93
VIS    2025250    183200   20.9100  146.7900       9.6        79       887        93
VIS    2025250    183200   20.9200  146.7600      11.8        71       871        93
VIS    2025250    183200   20.9100  146.6900      12.9        77       886        94
VIS    2025250    183200   20.9100  146.6500      13.3        77       886        95
VIS    2025250    183200   20.9000  146.6100      10.4        87       879        98
VIS    2025250    183200   20.9000  146.6000       9.9        88       876        99
VIS    2025250    183200   20.9200  146.5600      10.7        79       814        90
VIS    2025250    183200   20.9100  146.3300      14.4        73       890        92
VIS    2025250    183200   20.9100  146.2500      14.2        73       888        92
VIS    2025250    183200   20.9000  146.2300      14.9        75       913        93
VIS    2025250    183200   20.9200  146.1800      14.9        78       962        94
VIS    2025250    183200   20.9100  146.1400      15.9        78       934        96
VIS    2025250    183200   20.9000  146.1300      16.0        78       934        96
VIS    2025250    183200   20.9000  146.1100      16.0        78       926        96
VIS    2025250    183200   20.9100  146.0600      15.3        80       920        93
VIS    2025250    183200   20.9000  146.0600      15.2        77       919        96
VIS    2025250    183200   20.9000  146.0100      14.7        76       893        94
VIS    2025250    183200   20.9200  145.9400      15.9        76       919        92
VIS    2025250    183200   20.9200  145.9300      15.9        77       919        93
VIS    2025250    183200   20.8900  145.6500      13.4        88       781        91
VIS    2025250    183200   20.9000  145.6300      12.9        91       770        92
VIS    2025250    183200   20.9100  145.6000      12.1        94       760        94
VIS    2025250    183200   20.8900  145.5100      12.3        91       761        91
VIS    2025250    183200   20.9000  145.4600      13.1        89       747        91
VIS    2025250    183200   20.8900  145.4600      13.4        90       740        91
VIS    2025250    183200   20.8900  142.8200      11.4       116       810        96
VIS    2025250    183200   20.8800  142.8000      12.5       121       799        93
VIS    2025250    183200   20.8700  142.6900      11.8       104       799        90
VIS    2025250    183200   20.8800  142.6600      10.3        98       807        91
VIS    2025250    183200   20.8700  142.5000      13.1        86       938        97
VIS    2025250    183200   20.8700  142.4800      14.7        82       938        96
VIS    2025250    183200   20.8700  142.3600       9.6       119       874        95
VIS    2025250    183200   20.9700  151.6500       6.0        74       968        97
VIS    2025250    183200   20.9400  151.1600       8.2        79       974        90
VIS    2025250    183200   20.9400  151.1300       8.3        77       970        90
VIS    2025250    183200   20.9400  151.1000       7.6        75       934        94
VIS    2025250    183200   20.9400  151.0900       7.6        74       934        94
VIS    2025250    183200   20.9500  151.0500       6.8        80       919        97
VIS    2025250    183200   20.9500  151.0400       6.9        78       890        96
VIS    2025250    183200   20.9200  149.3500       9.3        71       946        90
VIS    2025250    183200   20.9300  149.0000      10.5        79       926        94
VIS    2025250    183200   20.9200  148.9700      10.4        78       902        92
VIS    2025250    183200   20.9300  148.9500       9.7        80       873        91
VIS    2025250    183200   20.9200  148.9100      10.2        84       854        92
VIS    2025250    183200   20.9100  148.8900      10.2        81       854        93
VIS    2025250    183200   20.9000  148.7400      10.8        74       875        90
VIS    2025250    183200   20.9200  148.7200      11.1        76       875        94
VIS    2025250    183200   20.9100  148.6800      10.7        75       872        95
VIS    2025250    183200   20.9200  148.6600      10.1        78       863        97
VIS    2025250    183200   20.9100  148.6500      10.0        79       863        98
VIS    2025250    183200   20.9100  148.6100       8.7        86       881        98
VIS    2025250    183200   20.9100  148.5800       8.7        85       898        96
VIS    2025250    183200   20.9200  148.5700       9.0        83       911        99
VIS    2025250    183200   20.9200  148.5300       9.6        73       958        97
VIS    2025250    183200   20.9000  148.4900       9.4        74       936        93
VIS    2025250    183200   20.9200  148.4800       9.8        74       937        94
VIS    2025250    183200   20.9000  148.4300       9.6        74       926        96
VIS    2025250    183200   20.9000  148.4200       9.5        74       926        96
VIS    2025250    183200   20.9100  148.3900       8.3        78       934        96
VIS    2025250    183200   20.9000  148.2900       8.5        80       968        92
VIS    2025250    183200   20.9100  148.2600       7.6        72       955        95
VIS    2025250    183200   20.9000  148.2300       8.6        75       959        94
VIS    2025250    183200   20.9000  148.2200       8.8        73       959        92
VIS    2025250    183200   20.9000  148.1800       8.3        71       933        95
VIS    2025250    183200   20.9000  148.1700       8.5        72       895        94
VIS    2025250    183200   20.9200  148.1400       8.8        73       886        91
VIS    2025250    183200   20.9100  148.1000       9.5        69       900        92
VIS    2025250    183200   20.9100  148.0800      10.1        68       908        93
VIS    2025250    183200   20.9100  148.0500       9.2        75       916        91
VIS    2025250    183200   20.9000  147.9900       9.6        74       969        92
VIS    2025250    183200   20.9100  147.9500       9.6        83       873        96
VIS    2025250    183200   20.9000  147.9300       8.5        87       866        97
VIS    2025250    183200   20.9000  147.9200       7.9        88       862        94
VIS    2025250    183200   20.8900  147.8900       7.0        87       861        92
VIS    2025250    183200   20.9100  147.8600       8.8        80       860        93
VIS    2025250    183200   20.9100  147.8300       8.8        82       865        95
VIS    2025250    183200   20.9100  147.8000       8.0        86       857        93
VIS    2025250    183200   20.9100  147.8000       7.9        85       857        93
VIS    2025250    183200   20.9100  147.7500       8.9        86       857        95
VIS    2025250    183200   20.8900  147.7200       8.1        92       806        91
VIS    2025250    183200   20.8900  147.7000       6.5        87       752        94
VIS    2025250    183200   20.8900  147.6800       5.6        93       752        93
VIS    2025250    183200   20.8900  147.6500       5.6       107       730        95
VIS    2025250    183200   20.9000  147.6300       6.3       110       731        98
VIS    2025250    183200   20.8900  147.6100       7.1       108       730        98
VIS    2025250    183200   20.9000  147.5500       8.4       107       700        90
VIS    2025250    183200   20.8900  147.4700       7.7       111       702        94
VIS    2025250    183200   20.8900  147.4600       7.4       107       704        97
VIS    2025250    183200   20.9000  147.4300       8.8        96       705        91
VIS    2025250    183200   20.9000  147.3600      11.0        93       831        99
VIS    2025250    183200   20.9000  147.3100       9.5        92       971        91
VIS    2025250    183200   20.9000  147.2400      10.2        91       947        93
VIS    2025250    183200   20.8800  147.2000       9.2        82       916        95
VIS    2025250    183200   20.9000  147.1800       9.8        85       895        96
VIS    2025250    183200   20.8900  147.1400      10.4        98       851        98
VIS    2025250    183200   20.9000  147.1000      11.2        84       884        99
VIS    2025250    183200   20.9000  147.0800      11.6        84       884        98
VIS    2025250    183200   20.9000  147.0700      12.2        82       868        96
VIS    2025250    183200   20.8900  147.0400      11.2        81       858        91
VIS    2025250    183200   20.8900  147.0000      10.1        86       858        94
VIS    2025250    183200   20.9000  146.9900      10.5        87       858        96
VIS    2025250    183200   20.9000  146.9700      10.4        95       858        99
VIS    2025250    183200   20.8800  146.9400      10.2        94       849        97
VIS    2025250    183200   20.8900  146.9000      11.4        95       812        97
VIS    2025250    183200   20.8800  146.8700      11.8        91       812        93
VIS    2025250    183200   20.8800  146.8300       8.8        84       899        95
VIS    2025250    183200   20.8800  146.8000       8.5        81       851        94
VIS    2025250    183200   20.9000  146.7100      13.1        74       882        92
VIS    2025250    183200   20.9000  146.6800      13.0        79       888        97
VIS    2025250    183200   20.9000  146.6700      13.3        80       888        96
VIS    2025250    183200   20.8800  146.6400      12.4        79       902       100
VIS    2025250    183200   20.9000  146.6000      10.1        87       876        99
VIS    2025250    183200   20.8800  146.5900      10.8        86       876        97
VIS    2025250    183200   20.8800  146.2500      14.1        78       890        96
VIS    2025250    183200   20.8900  146.2300      14.8        76       913        93
VIS    2025250    183200   20.8700  146.1500      16.2        77       938        91
VIS    2025250    183200   20.8900  146.1400      16.4        80       934        95
VIS    2025250    183200   20.8700  146.1000      15.4        79       926        97
VIS    2025250    183200   20.8700  146.0800      14.7        79       923        99
VIS    2025250    183200   20.8800  146.0700      15.1        76       913        97
VIS    2025250    183200   20.8800  146.0400      14.7        76       911        97
VIS    2025250    183200   20.8700  145.6500      13.6        87       768        90
VIS    2025250    183200   20.8800  145.6500      13.4        88       770        91
VIS    2025250    183200   20.8800  145.6000      13.3        88       756        90
VIS    2025250    183200   20.8900  145.5300      12.4        89       775        90
VIS    2025250    183200   20.8900  145.5100      12.5        90       767        90
VIS    2025250    183200   20.8900  145.4600      13.7        89       735        90
VIS    2025250    183200   20.8400  142.8100      11.6       103       787        92
VIS    2025250    183200   20.8400  142.8000      11.9       104       791        92
VIS    2025250    183200   20.8500  142.5300      12.3        89       938        99
VIS    2025250    183200   20.8400  142.4900      14.4        88       959        97
VIS    2025250    183200   20.8500  142.4800      15.0        86       939        95
VIS    2025250    183200   20.8600  142.3900      10.4       110       938        91
VIS    2025250    183200   20.9300  151.2400       7.9        73       963        90
VIS    2025250    183200   20.9100  151.1700       7.9        75       974        92
VIS    2025250    183200   20.9100  151.1500       7.9        77       970        91
VIS    2025250    183200   20.9100  151.1400       8.1        77       967        91
VIS    2025250    183200   20.9300  151.1000       7.7        74       934        94
VIS    2025250    183200   20.9200  151.0700       7.6        74       874        91
VIS    2025250    183200   20.9300  151.0400       7.4        73       869        90
VIS    2025250    183200   20.9200  150.9200       6.2        81       944        95
VIS    2025250    183200   20.9100  149.4200       8.5        68       955        91
VIS    2025250    183200   20.9000  149.3300       8.7        69       946        93
VIS    2025250    183200   20.9100  149.3300       8.7        69       946        93
VIS    2025250    183200   20.9000  148.9900      10.8        78       961        91
VIS    2025250    183200   20.8900  148.9600      10.4        73       904        95
VIS    2025250    183200   20.8800  148.9500      10.3        73       904        95
VIS    2025250    183200   20.8900  148.9200       9.2        73       855        96
VIS    2025250    183200   20.8800  148.8900      10.3        76       855        93
VIS    2025250    183200   20.8900  148.7200      10.3        69       875        92
VIS    2025250    183200   20.8800  148.6800       9.8        72       875        91
VIS    2025250    183200   20.9000  148.6600       9.9        77       864        96
VIS    2025250    183200   20.8900  148.6500       9.6        80       864        98
VIS    2025250    183200   20.8900  148.6200       9.1        83       875        99
VIS    2025250    183200   20.8800  148.5900       8.9        81       891        93
VIS    2025250    183200   20.9000  148.5500       8.8        81       926        95
VIS    2025250    183200   20.8900  148.5000       9.1        76       936        95
VIS    2025250    183200   20.8900  148.5000       9.1        76       936        95
VIS    2025250    183200   20.8800  148.4700       9.3        75       940        92
VIS    2025250    183200   20.8800  148.4500       9.7        74       926        92
VIS    2025250    183200   20.8800  148.4000       9.1        70       927        92
VIS    2025250    183200   20.8900  148.3800       8.5        67       931        92
VIS    2025250    183200   20.8900  148.2700       8.1        72       959        95
VIS    2025250    183200   20.8800  148.2300       8.7        67       957        94
VIS    2025250    183200   20.8900  148.1800       8.3        71       933        94
VIS    2025250    183200   20.8700  148.1700       8.5        74       896        94
VIS    2025250    183200   20.8700  148.1300       9.5        75       885        92
VIS    2025250    183200   20.8700  148.1200      10.9        71       885        91
VIS    2025250    183200   20.8900  147.9700       9.2        73       937        93
VIS    2025250    183200   20.8900  147.9700       9.1        75       914        96
VIS    2025250    183200   20.8800  147.9400       8.5        87       870        97
VIS    2025250    183200   20.8700  147.9200       7.4        86       866        94
VIS    2025250    183200   20.8900  147.8800       7.4        92       862        93
VIS    2025250    183200   20.8700  147.8500       8.3        89       865        99
VIS    2025250    183200   20.8800  147.8200       8.8        79       865        96
VIS    2025250    183200   20.8800  147.8100       8.9        78       867        95
VIS    2025250    183200   20.8800  147.7900       8.6        80       867        93
VIS    2025250    183200   20.8900  147.7600       8.3        94       867        91
VIS    2025250    183200   20.8700  147.7000       6.2        84       809        91
VIS    2025250    183200   20.8700  147.6900       6.0        87       806        91
VIS    2025250    183200   20.8800  147.6600       5.5       105       730        94
VIS    2025250    183200   20.8600  147.6200       7.3       107       713        90
VIS    2025250    183200   20.8600  147.6200       7.4       106       713        90
VIS    2025250    183200   20.8600  147.4900       8.2       109       700        90
VIS    2025250    183200   20.8800  147.4500       7.4       103       705        97
VIS    2025250    183200   20.8700  147.3500      10.9        85       946        96
VIS    2025250    183200   20.8700  147.3200       9.8        89       971        91
VIS    2025250    183200   20.8600  147.2200       9.7        81       959        92
VIS    2025250    183200   20.8600  147.2000       9.3        81       916        94
VIS    2025250    183200   20.8800  147.1900       9.4        84       914        93
VIS    2025250    183200   20.8700  147.1500       9.9        97       845        95
VIS    2025250    183200   20.8800  147.1400      10.2        98       849        98
VIS    2025250    183200   20.8600  147.0800      10.6        82       864        92
VIS    2025250    183200   20.8600  147.0700      10.8        82       864        91
VIS    2025250    183200   20.8600  147.0200      10.6        91       852        98
VIS    2025250    183200   20.8700  147.0100      10.1        91       854        94
VIS    2025250    183200   20.8800  146.9900       9.7        87       854        94
VIS    2025250    183200   20.8600  146.9700       9.1        92       849        94
VIS    2025250    183200   20.8800  146.9400      10.4        95       849        98
VIS    2025250    183200   20.8600  146.9200      12.8        87       829        91
VIS    2025250    183200   20.8700  146.8400      10.2        77       899        94
VIS    2025250    183200   20.8500  146.8000      10.4        77       839        90
VIS    2025250    183200   20.8500  146.7000      12.3        84       895        94
VIS    2025250    183200   20.8600  146.6700      12.4        84       907        97
VIS    2025250    183200   20.8600  146.6600      12.4        82       912        99
VIS    2025250    183200   20.8600  146.6400      11.9        84       912        99
VIS    2025250    183200   20.8600  146.6100      10.8        84       892        98
VIS    2025250    183200   20.8700  146.5900      11.3        82       869        94
VIS    2025250    183200   20.8500  146.5600      11.7        75       864        90
VIS    2025250    183200   20.8500  146.3900      13.2        75       904        92
VIS    2025250    183200   20.8600  146.3600      13.6        74       892        93
VIS    2025250    183200   20.8600  146.3200      14.4        74       902        93
VIS    2025250    183200   20.8500  146.3100      14.3        73       912        95
VIS    2025250    183200   20.8600  146.2900      14.3        73       909        93
VIS    2025250    183200   20.8500  146.2500      14.2        78       886        93
VIS    2025250    183200   20.8600  146.2200      14.6        81       922        95
VIS    2025250    183200   20.8700  146.2000      15.3        76       942        91
VIS    2025250    183200   20.8700  146.1900      15.5        76       947        92
VIS    2025250    183200   20.8500  146.1600      15.8        74       940        95
VIS    2025250    183200   20.8500  146.1200      15.5        81       931        96
VIS    2025250    183200   20.8600  146.1000      15.0        82       925        98
VIS    2025250    183200   20.8500  146.0900      14.7        87       911        97
VIS    2025250    183200   20.8400  145.6500      13.1        89       765        91
VIS    2025250    183200   20.8600  145.6300      12.6        89       768        92
VIS    2025250    183200   20.8600  145.6200      12.4        90       768        90
VIS    2025250    183200   20.8400  142.8100      11.7       102       787        91
VIS    2025250    183200   20.8200  142.5100      13.9        93       958        97
VIS    2025250    183200   20.8300  142.4400      13.5        87       933        94
VIS    2025250    183200   20.8300  142.4300      12.9        88       936        98
VIS    2025250    183200   20.8300  142.3900      12.7        88       946       100
VIS    2025250    183200   20.8300  142.3700      12.3        91       946        99
VIS    2025250    183200   20.9100  151.6100       6.6        87       979        91
VIS    2025250    183200   20.9000  151.2500       8.3        73       935        90
VIS    2025250    183200   20.8900  151.2300       8.0        74       948        92
VIS    2025250    183200   20.8900  151.1900       7.9        67       965        90
VIS    2025250    183200   20.9100  151.1400       8.0        77       948        91
VIS    2025250    183200   20.9100  151.1300       8.1        76       908        93
VIS    2025250    183200   20.9000  151.1100       8.1        71       894        92
VIS    2025250    183200   20.8700  149.3000       8.3        74       972        91
VIS    2025250    183200   20.8700  148.9600      10.6        73       905        94
VIS    2025250    183200   20.8600  148.9300      10.0        75       905        95
VIS    2025250    183200   20.8500  148.9200      10.2        75       904        95
VIS    2025250    183200   20.8600  148.8800      10.6        77       859        92
VIS    2025250    183200   20.8500  148.8700      11.0        78       876        91
VIS    2025250    183200   20.8500  148.7200      10.7        73       880        95
VIS    2025250    183200   20.8700  148.6900       9.9        73       877        94
VIS    2025250    183200   20.8600  148.6600       9.7        74       875        94
VIS    2025250    183200   20.8700  148.6300       9.3        78       875        99
VIS    2025250    183200   20.8600  148.6200       9.3        76       875        98
VIS    2025250    183200   20.8700  148.5900       8.9        80       898        93
VIS    2025250    183200   20.8600  148.5000       9.4        80       975        94
VIS    2025250    183200   20.8500  148.4800       9.5        80       972        94
VIS    2025250    183200   20.8500  148.4600       9.0        79       935        96
VIS    2025250    183200   20.8700  148.4300       9.2        74       924        94
VIS    2025250    183200   20.8700  148.4200       9.2        74       924        93
VIS    2025250    183200   20.8500  148.3900       8.6        70       924        94
VIS    2025250    183200   20.8500  148.3400       7.8        73       942        93
VIS    2025250    183200   20.8500  148.2700       8.1        78       928        94
VIS    2025250    183200   20.8600  148.2700       8.2        75       939        91
VIS    2025250    183200   20.8700  148.2300       8.6        69       954        95
VIS    2025250    183200   20.8700  148.2200       8.6        68       954        91
VIS    2025250    183200   20.8700  148.1800       8.3        73       922        94
VIS    2025250    183200   20.8600  148.1600       8.7        76       895        95
VIS    2025250    183200   20.8600  148.1400       9.3        79       887        94
VIS    2025250    183200   20.8400  148.1000      11.8        74       891        92
VIS    2025250    183200   20.8400  147.9500       7.3        75       878        92
VIS    2025250    183200   20.8400  147.9300       7.6        78       870        93
VIS    2025250    183200   20.8400  147.9100       8.1        86       868        96
VIS    2025250    183200   20.8500  147.8900       8.5        93       868        98
VIS    2025250    183200   20.8400  147.8500       7.5        79       868        96
VIS    2025250    183200   20.8400  147.8300       7.5        74       865        93
VIS    2025250    183200   20.8400  147.8200       8.0        76       862        93
VIS    2025250    183200   20.8400  147.7700       8.2        93       865        95
VIS    2025250    183200   20.8500  147.7400       7.5        97       813        92
VIS    2025250    183200   20.8600  147.7100       6.7        84       809        92
VIS    2025250    183200   20.8500  147.6700       6.2        99       739        90
VIS    2025250    183200   20.8600  147.6500       6.6       106       711        95
VIS    2025250    183200   20.8400  147.6400       7.4       107       711        93
VIS    2025250    183200   20.8500  147.6200       7.6       106       713        91
VIS    2025250    183200   20.8600  147.4900       8.2       109       700        90
VIS    2025250    183200   20.8400  147.4600       7.4       105       706        90
VIS    2025250    183200   20.8500  147.3700      10.8        86       921        97
VIS    2025250    183200   20.8400  147.3400      11.6        87       956        95
VIS    2025250    183200   20.8400  147.2200       9.9        80       959        90
VIS    2025250    183200   20.8400  147.2000      10.0        81       909        95
VIS    2025250    183200   20.8500  147.1500      10.7        82       844        92
VIS    2025250    183200   20.8500  147.0800      10.5        82       864        91
VIS    2025250    183200   20.8300  147.0600      10.5        84       866        91
VIS    2025250    183200   20.8500  147.0200      10.7        92       852        98
VIS    2025250    183200   20.8400  146.9900       9.8        98       847        92
VIS    2025250    183200   20.8500  146.9900       9.7        93       852        91
VIS    2025250    183200   20.8400  146.9400      10.9        98       832        98
VIS    2025250    183200   20.8300  146.9300      12.0        93       830        93
VIS    2025250    183200   20.8300  146.8200       9.8        79       812        90
VIS    2025250    183200   20.8400  146.8000      10.3        79       826        92
VIS    2025250    183200   20.8500  146.7900      11.1        78       839        91
VIS    2025250    183200   20.8400  146.7300      12.8        78       872        92
VIS    2025250    183200   20.8500  146.7100      12.5        83       888        95
VIS    2025250    183200   20.8500  146.6700      12.1        84       912        97
VIS    2025250    183200   20.8500  146.6500      12.0        86       912        98
VIS    2025250    183200   20.8500  146.6100      10.6        85       897        97
VIS    2025250    183200   20.8300  146.5700      10.6        75       867        94
VIS    2025250    183200   20.8500  146.5700      11.4        76       864        92
VIS    2025250    183200   20.8200  146.4400      14.0        72       957        99
VIS    2025250    183200   20.8400  146.3900      12.9        79       892        96
VIS    2025250    183200   20.8400  146.3700      12.8        80       892        99
VIS    2025250    183200   20.8400  146.3200      14.2        72       912        92
VIS    2025250    183200   20.8400  146.3100      14.2        70       917        93
VIS    2025250    183200   20.8300  146.2700      14.3        71       890        93
VIS    2025250    183200   20.8300  146.2700      14.2        72       890        93
VIS    2025250    183200   20.8300  146.2200      14.8        79       925        98
VIS    2025250    183200   20.8200  146.2200      14.9        78       925        98
VIS    2025250    183200   20.8300  146.1800      15.5        77       941        98
VIS    2025250    183200   20.8200  146.1600      15.8        79       938        97
VIS    2025250    183200   20.8300  146.1200      15.5        87       919        95
VIS    2025250    183200   20.8400  146.1100      15.6        87       885        93
VIS    2025250    183200   20.8400  146.0600      14.6        89       822        90
VIS    2025250    183200   20.8200  145.7600      13.0        85       806        92
VIS    2025250    183200   20.8300  145.7100      13.1        92       792        91
VIS    2025250    183200   20.8300  145.6900      13.3        96       784        92
VIS    2025250    183200   20.8400  145.6500      13.1        89       765        91
VIS    2025250    183200   20.8200  145.6400      12.8        87       782        91
VIS    2025250    183200   20.8300  145.6200      12.1        83       795        90
VIS    2025250    183200   20.8000  142.9000      11.4       101       746        91
VIS    2025250    183200   20.8000  142.8400      10.9       107       747        93
VIS    2025250    183200   20.8100  142.8200      11.0       103       755        93
VIS    2025250    183200   20.7900  142.7600      11.4        97       785        90
VIS    2025250    183200   20.8000  142.4200      12.1        89       924        95
VIS    2025250    183200   20.7900  142.4100      11.6        91       924        91
VIS    2025250    183200   20.8800  152.0400       5.3        72       996        94
VIS    2025250    183200   20.8800  151.5900       6.3        82       981        94
VIS    2025250    183200   20.8700  151.5600       6.6        81       981        96
VIS    2025250    183200   20.8600  151.2400       8.2        73       923        91
VIS    2025250    183200   20.8600  151.2100       8.3        70       933        91
VIS    2025250    183200   20.8800  151.1800       8.1        69       911        90
VIS    2025250    183200   20.8400  148.9200      10.7        74       905        93
VIS    2025250    183200   20.8300  148.9100      11.1        75       874        92
VIS    2025250    183200   20.8500  148.8600      11.0        79       890        91
VIS    2025250    183200   20.8400  148.8500      10.8        80       904        92
VIS    2025250    183200   20.8500  148.7100      10.8        75       880        95
VIS    2025250    183200   20.8400  148.7000      10.8        77       880        96
VIS    2025250    183200   20.8300  148.6600      10.5        72       881        92
VIS    2025250    183200   20.8300  148.6400      10.2        71       877        93
VIS    2025250    183200   20.8400  148.6100       9.6        74       878        96
VIS    2025250    183200   20.8500  148.6000       9.4        76       880        94
VIS    2025250    183200   20.8300  148.5700       9.1        85       908        90
VIS    2025250    183200   20.8300  148.4800       9.2        78       972        93
VIS    2025250    183200   20.8400  148.4600       8.8        79       935        96
VIS    2025250    183200   20.8300  148.4500       8.5        78       935        96
VIS    2025250    183200   20.8200  148.4100       8.0        72       925        96
VIS    2025250    183200   20.8300  148.4000       8.1        74       924        94
VIS    2025250    183200   20.8300  148.3800       7.7        77       927        92
VIS    2025250    183200   20.8300  148.3300       7.8        82       959        93
VIS    2025250    183200   20.8200  148.3000       7.7        86       970        95
VIS    2025250    183200   20.8400  148.2700       8.2        79       928        96
VIS    2025250    183200   20.8200  148.2400       8.1        85       939        95
VIS    2025250    183200   20.8200  148.2100       7.6        80       939        94
VIS    2025250    183200   20.8200  148.1900       8.0        78       904        97
VIS    2025250    183200   20.8300  148.1600       8.6        78       898        98
VIS    2025250    183200   20.8300  148.1500       8.7        80       897        97
VIS    2025250    183200   20.8300  148.1300       9.2        85       888        95
VIS    2025250    183200   20.8200  148.0900      10.8        71       896        94
VIS    2025250    183200   20.8300  147.9800       7.3        69       971        92
VIS    2025250    183200   20.8400  147.9700       7.1        73       937        92
VIS    2025250    183200   20.8300  147.9400       7.5        72       878        93
VIS    2025250    183200   20.8400  147.9300       7.7        78       868        94
VIS    2025250    183200   20.8200  147.8900       8.9        91       870        99
VIS    2025250    183200   20.8300  147.8700       8.2        82       870        98
VIS    2025250    183200   20.8200  147.8400       8.0        67       866        90
VIS    2025250    183200   20.8300  147.8200       7.7        71       862        91
VIS    2025250    183200   20.8300  147.7900       8.1        83       865        97
VIS    2025250    183200   20.8200  147.7700       8.3        95       865        99
VIS    2025250    183200   20.8100  147.7300       7.2        86       813        92
VIS    2025250    183200   20.8200  147.7100       7.0        82       796        92
VIS    2025250    183200   20.8100  147.6900       6.9        90       719        90
VIS    2025250    183200   20.8300  147.6600       7.1       104       714        93
VIS    2025250    183200   20.8100  147.6400       7.8       107       714        91
VIS    2025250    183200   20.8300  147.4700       7.6       110       706        91
VIS    2025250    183200   20.8300  147.4300       8.9        95       721        90
VIS    2025250    183200   20.8300  147.4200       9.2        95       721        91
VIS    2025250    183200   20.8300  147.3800      11.1        88       893        97
VIS    2025250    183200   20.8100  147.3500      12.0        87       947        93
VIS    2025250    183200   20.8300  147.3400      11.8        87       956        94
VIS    2025250    183200   20.8200  147.3200      11.4        89       962        91
VIS    2025250    183200   20.8100  147.2000      10.7        81       868        92
VIS    2025250    183200   20.8100  147.1900      10.6        83       854        90
VIS    2025250    183200   20.8100  147.0800      11.7        78       889        96
VIS    2025250    183200   20.8100  147.0700      11.5        81       889        97
VIS    2025250    183200   20.8200  147.0400      10.3        93       847        96
VIS    2025250    183200   20.8200  147.0000      10.0       109       841        94
VIS    2025250    183200   20.8300  147.0000       9.9       105       841        94
VIS    2025250    183200   20.8300  146.9700       9.8       108       841        90
VIS    2025250    183200   20.8100  146.9400      10.6       104       761        95
VIS    2025250    183200   20.8200  146.9000      12.1        81       825        90
VIS    2025250    183200   20.8200  146.8000      11.1        79       826        90
VIS    2025250    183200   20.8100  146.7300      11.1        85       838        91
VIS    2025250    183200   20.8200  146.6800      12.1        80       897        93
VIS    2025250    183200   20.8200  146.6600      11.8        85       936        94
VIS    2025250    183200   20.8000  146.6100      10.4        76       878        95
VIS    2025250    183200   20.8100  146.5900      10.8        74       874        96
VIS    2025250    183200   20.8100  146.5500      10.1        79       874        94
VIS    2025250    183200   20.8100  146.4500      13.5        75       957        96
VIS    2025250    183200   20.8000  146.4300      14.5        76       918        95
VIS    2025250    183200   20.8000  146.4200      14.3        76       918        96
VIS    2025250    183200   20.8000  146.3300      14.7        76       906        94
VIS    2025250    183200   20.8000  146.3200      14.9        76       917        95
VIS    2025250    183200   20.8100  146.2800      15.1        69       923        94
VIS    2025250    183200   20.8000  146.2700      14.5        75       923        97
VIS    2025250    183200   20.8000  146.2300      13.8        81       905        98
VIS    2025250    183200   20.8100  146.2100      14.2        80       913        99
VIS    2025250    183200   20.8200  146.1800      15.2        80       940        98
VIS    2025250    183200   20.8200  146.1700      15.5        80       940        97
VIS    2025250    183200   20.8100  145.7700      13.1        87       806        91
VIS    2025250    183200   20.8100  145.7500      13.3        87       794        91
VIS    2025250    183200   20.8100  145.7100      13.4        93       794        90
VIS    2025250    183200   20.8100  145.7000      13.5        94       794        91
VIS    2025250    183200   20.8100  145.6700      14.3        93       774        92
VIS    2025250    183200   20.7900  142.9200      11.0       106       740        90
VIS    2025250    183200   20.7800  142.9000       9.3       109       734        91
VIS    2025250    183200   20.7800  142.8700      10.3       113       732        96
VIS    2025250    183200   20.7700  142.8400      11.1       114       744        92
VIS    2025250    183200   20.7700  142.8300      11.3       113       746        91
VIS    2025250    183200   20.7700  142.7600      10.8       116       767        92
VIS    2025250    183200   20.7700  142.6900      10.6       123       767        94
VIS    2025250    183200   20.7900  142.6700       9.8       113       773        92
VIS    2025250    183200   20.7900  142.6500       9.1       112       767        93
VIS    2025250    183200   20.8500  151.2300       8.3        74       910        91
VIS    2025250    183200   20.8100  148.8900      11.4        77       874        91
VIS    2025250    183200   20.8200  148.8400      10.2        80       912        94
VIS    2025250    183200   20.8100  148.8200       9.8        79       912        96
VIS    2025250    183200   20.8000  148.8100       9.7        78       929        97
VIS    2025250    183200   20.8000  148.7600      11.7        85       927        90
VIS    2025250    183200   20.8000  148.7100      11.6        82       897        94
VIS    2025250    183200   20.8200  148.6900      11.2        79       885        96
VIS    2025250    183200   20.8200  148.6800      11.2        78       887        96
VIS    2025250    183200   20.8200  148.6400      10.6        71       881        94
VIS    2025250    183200   20.8200  148.6200      10.0        72       880        95
VIS    2025250    183200   20.8000  148.6100       9.7        78       884        96
VIS    2025250    183200   20.8000  148.4900       8.2        70       972        93
VIS    2025250    183200   20.8100  148.4800       8.3        72       972        92
VIS    2025250    183200   20.8100  148.4400       8.1        67       928        91
VIS    2025250    183200   20.8200  148.4100       8.1        70       925        96
VIS    2025250    183200   20.8100  148.4100       8.2        71       927        96
VIS    2025250    183200   20.8000  148.3800       7.9        75       928        97
VIS    2025250    183200   20.8100  148.2800       7.9        88       944        94
VIS    2025250    183200   20.8000  148.2800       8.1        90       944        93
VIS    2025250    183200   20.8200  148.2300       8.0        85       951        94
VIS    2025250    183200   20.8100  148.2200       7.7        83       951        93
VIS    2025250    183200   20.8100  148.2000       7.5        80       922        93
VIS    2025250    183200   20.8000  148.1600       8.5        77       901        97
VIS    2025250    183200   20.8000  148.1400       8.3        77       902        97
VIS    2025250    183200   20.7900  148.1200       8.7        74       910        94
VIS    2025250    183200   20.8100  148.0400       9.5        67       991        93
VIS    2025250    183200   20.8000  148.0100       8.3        78       967        95
VIS    2025250    183200   20.8000  148.0000       8.0        74       967        94
VIS    2025250    183200   20.8000  147.9200       9.0        87       868        94
VIS    2025250    183200   20.7900  147.8900       9.0        83       868        96
VIS    2025250    183200   20.8000  147.8600       8.8        72       869        92
VIS    2025250    183200   20.7900  147.7900       8.2        84       868        95
VIS    2025250    183200   20.8000  147.7600       7.9        95       842        98
VIS    2025250    183200   20.8100  147.7100       7.2        84       796        90
VIS    2025250    183200   20.8000  147.6800       7.1        99       718        90
VIS    2025250    183200   20.8100  147.6700       7.2       102       718        91
VIS    2025250    183200   20.8100  147.4300       8.9        98       721        92
VIS    2025250    183200   20.8100  147.4200       9.6        96       738        93
VIS    2025250    183200   20.7900  147.4000      10.8        89       859        95
VIS    2025250    183200   20.8000  147.3600      11.7        86       938        95
VIS    2025250    183200   20.8000  147.3500      11.8        87       947        93
VIS    2025250    183200   20.7900  147.3300      10.7        86       975        91
VIS    2025250    183200   20.7800  147.2800      10.4        70       948        94
VIS    2025250    183200   20.7800  147.2300      10.4        78       901        98
VIS    2025250    183200   20.8000  147.2100      11.0        79       868        91
VIS    2025250    183200   20.8000  147.0800      11.8        78       889        94
VIS    2025250    183200   20.8000  147.0800      11.7        80       889        95
VIS    2025250    183200   20.7900  147.0300      10.1       108       840        93
VIS    2025250    183200   20.7900  146.9300      10.4       107       744        95
VIS    2025250    183200   20.7900  146.9200      10.4       103       744        94
VIS    2025250    183200   20.8000  146.7400      12.6        82       827        90
VIS    2025250    183200   20.7800  146.7100      12.6        88       902        97
VIS    2025250    183200   20.7900  146.6900      12.5        86       927        97
VIS    2025250    183200   20.7900  146.6600      12.1        85       929        95
VIS    2025250    183200   20.7900  146.6300      10.2        85       899        95
VIS    2025250    183200   20.7900  146.6300      10.5        81       899        95
VIS    2025250    183200   20.7800  146.5800      12.1        74       879        95
VIS    2025250    183200   20.7900  146.5700      11.4        76       888        96
VIS    2025250    183200   20.7900  146.5100       9.6        88       906        92
VIS    2025250    183200   20.8000  146.5000       9.7        89       906        90
VIS    2025250    183200   20.7700  146.4600      13.9        72       918        93
VIS    2025250    183200   20.7800  146.3300      15.0        73       921        93
VIS    2025250    183200   20.7800  146.3300      15.0        75       921        94
VIS    2025250    183200   20.7900  146.3000      15.7        76       924        95
VIS    2025250    183200   20.7900  146.2800      15.1        73       923        94
VIS    2025250    183200   20.7800  146.2400      13.7        83       902        95
VIS    2025250    183200   20.7900  146.2300      13.7        82       905        97
VIS    2025250    183200   20.7500  142.8200      11.2       110       747        93
VIS    2025250    183200   20.7600  142.8000      11.5       112       751        93
VIS    2025250    183200   20.7600  142.7800      11.1       115       754        93
VIS    2025250    183200   20.7600  142.7600      11.0       119       767        94
VIS    2025250    183200   20.7500  142.7400      11.5       127       759        93
VIS    2025250    183200   20.7500  142.7000      11.4       125       760        94
VIS    2025250    183200   20.7600  142.6800      11.2       125       767        95
VIS    2025250    183200   20.7500  142.6600      12.2       128       768        93
VIS    2025250    183200   20.7500  142.6300      11.6       129       745        92
VIS    2025250    183200   20.7500  142.5000      11.0       126       799        95
VIS    2025250    183200   20.7500  142.5000      10.9       127       883        92
VIS    2025250    183200   20.7400  142.4000      10.8       129       901        93
VIS    2025250    183200   20.8100  151.1500       6.9        76       914        95
VIS    2025250    183200   20.7900  148.8300      10.1        79       912        94
VIS    2025250    183200   20.8000  148.7500      11.6        83       927        92
VIS    2025250    183200   20.7800  148.7100      11.6        81       915        94
VIS    2025250    183200   20.7900  148.6800      11.5        82       894        95
VIS    2025250    183200   20.7800  148.6500      10.9        82       893        95
VIS    2025250    183200   20.7800  148.6500      10.7        82       893        96
VIS    2025250    183200   20.7900  148.6100       9.6        79       886        96
VIS    2025250    183200   20.7900  148.6000       9.5        81       890        96
VIS    2025250    183200   20.7900  148.5200       8.3        79       966        95
VIS    2025250    183200   20.7700  148.5000       7.4        73       970        98
VIS    2025250    183200   20.7800  148.4500       8.1        65       947        92
VIS    2025250    183200   20.7800  148.4000       8.7        70       939        97
VIS    2025250    183200   20.7800  148.2800       8.1        86       944        93
VIS    2025250    183200   20.7700  148.2500       8.2        80       970        94
VIS    2025250    183200   20.7700  148.2300       7.9        86       965        92
VIS    2025250    183200   20.7900  148.1900       8.0        88       908        95
VIS    2025250    183200   20.7900  148.1500       8.6        78       910        98
VIS    2025250    183200   20.7900  148.1300       8.8        72       912        95
VIS    2025250    183200   20.7900  148.1100       8.9        70       912        91
VIS    2025250    183200   20.7700  148.0600      10.5        63       994        96
VIS    2025250    183200   20.7800  148.0400       8.5        74       994        96
VIS    2025250    183200   20.7700  148.0000       8.5        82       954        95
VIS    2025250    183200   20.7700  147.9900       8.0        84       947        94
VIS    2025250    183200   20.7700  147.9400       7.3        88       870        91
VIS    2025250    183200   20.7800  147.9100       9.4        88       868        96
VIS    2025250    183200   20.7900  147.8900       9.0        82       868        95
VIS    2025250    183200   20.7700  147.8700       8.8        81       868        91
VIS    2025250    183200   20.7900  147.8300       9.3        75       869        90
VIS    2025250    183200   20.7800  147.8000       8.3        83       868        94
VIS    2025250    183200   20.7700  147.7900       8.1        89       860        94
VIS    2025250    183200   20.7600  147.7600       7.5        96       768        96
VIS    2025250    183200   20.7600  147.7300       7.2       105       719        96
VIS    2025250    183200   20.7700  147.7000       7.9       108       719        90
VIS    2025250    183200   20.7800  147.6700       7.7       104       711        90
VIS    2025250    183200   20.7800  147.6700       7.8       105       709        91
VIS    2025250    183200   20.7600  147.6400       8.0       108       703        95
VIS    2025250    183200   20.7700  147.4200      11.7        90       807        95
VIS    2025250    183200   20.7600  147.3700      10.8        91       938        90
VIS    2025250    183200   20.7600  147.3200       9.9        82       975        90
VIS    2025250    183200   20.7600  147.2800      10.9        69       947        91
VIS    2025250    183200   20.7600  147.2700      10.9        71       946        93
VIS    2025250    183200   20.7600  147.2400      11.0        73       901        91
VIS    2025250    183200   20.7800  147.2100      11.2        76       868        93
VIS    2025250    183200   20.7700  147.0900      12.7        77       893        96
VIS    2025250    183200   20.7600  147.0600      11.0        93       901        94
VIS    2025250    183200   20.7700  147.0200      10.7       114       835        91
VIS    2025250    183200   20.7700  147.0200      10.7       117       807        91
VIS    2025250    183200   20.7800  146.9700      10.8       123       727        90
VIS    2025250    183200   20.7600  146.8300      10.8        96       736        93
VIS    2025250    183200   20.7500  146.7000      13.0        85       932        96
VIS    2025250    183200   20.7600  146.6700      13.0        85       929        97
VIS    2025250    183200   20.7700  146.6700      13.2        84       929        97
VIS    2025250    183200   20.7600  146.6300      10.7        88       876        94
VIS    2025250    183200   20.7700  146.6100      10.9        79       872        92
VIS    2025250    183200   20.7700  146.5800      12.2        73       888        95
VIS    2025250    183200   20.7600  146.5500      13.0        72       906        96
VIS    2025250    183200   20.7600  146.5400      13.4        72       906        91
VIS    2025250    183200   20.7500  146.4900      12.4        74       973        92
VIS    2025250    183200   20.7500  146.4600      12.5        71       895        92
VIS    2025250    183200   20.7600  146.3200      15.3        74       950        94
VIS    2025250    183200   20.7400  145.8600      13.1        85       804        91
VIS    2025250    183200   20.7500  145.8300      12.8        88       791        93
VIS    2025250    183200   20.7500  145.8200      13.2        87       784        92
VIS    2025250    183200   20.7300  142.8100      11.1       114       746        94
VIS    2025250    183200   20.7400  142.7400      11.5       129       734        92
VIS    2025250    183200   20.7300  142.7300      11.9       125       736        94
VIS    2025250    183200   20.7200  142.6900      12.1       123       856        94
VIS    2025250    183200   20.7300  142.6900      12.2       124       857        95
VIS    2025250    183200   20.7300  142.6400      12.3       130       773        92
VIS    2025250    183200   20.7300  142.6400      12.3       130       855        93
VIS    2025250    183200   20.7400  142.5000      11.1       127       883        92
VIS    2025250    183200   20.7400  142.4900      11.0       129       889        91
VIS    2025250    183200   20.7200  142.4400      10.7       129       894        90
VIS    2025250    183200   20.7200  142.4000      10.0       131       902        91
VIS    2025250    183200   20.7200  142.3700       9.8       122       907        93
VIS    2025250    183200   20.7200  142.3700       9.8       119       907        95
VIS    2025250    183200   20.7900  151.5600       7.0        80       965        90
VIS    2025250    183200   20.8000  151.1600       7.2        69       918        90
VIS    2025250    183200   20.8000  151.0500       7.5        66       918        90
VIS    2025250    183200   20.7500  148.7400      10.2        74       986        96
VIS    2025250    183200   20.7600  148.7000      11.5        82       915        93
VIS    2025250    183200   20.7600  148.6500      10.4        83       893        94
VIS    2025250    183200   20.7500  148.6200       9.9        80       890        96
VIS    2025250    183200   20.7600  148.6000       9.7        82       890        96
VIS    2025250    183200   20.7700  148.5900       9.6        84       892        96
VIS    2025250    183200   20.7500  148.5600       9.9        82       927        90
VIS    2025250    183200   20.7700  148.5000       7.3        75       970        98
VIS    2025250    183200   20.7500  148.3000       8.5        75       983        96
VIS    2025250    183200   20.7500  148.2700       8.4        75       972        92
VIS    2025250    183200   20.7500  148.2500       8.5        77       970        93
VIS    2025250    183200   20.7500  148.2400       8.4        78       970        93
VIS    2025250    183200   20.7500  148.1900       8.3        78       933        96
VIS    2025250    183200   20.7600  148.1700       9.1        79       926        92
VIS    2025250    183200   20.7600  148.1600       9.2        81       916        92
VIS    2025250    183200   20.7600  148.1200      10.1        69       943        93
VIS    2025250    183200   20.7500  148.0900      11.6        63       965        92
VIS    2025250    183200   20.7500  148.0900      11.6        62       965        91
VIS    2025250    183200   20.7500  148.0500      10.7        61       985        96
VIS    2025250    183200   20.7400  148.0200       8.8        78       975        94
VIS    2025250    183200   20.7400  148.0100       8.8        78       975        95
VIS    2025250    183200   20.7400  147.9900       8.2        83       947        94
VIS    2025250    183200   20.7500  147.9400       7.2        88       875        94
VIS    2025250    183200   20.7500  147.9400       7.4        87       875        94
VIS    2025250    183200   20.7400  147.9100       9.1        87       870        99
VIS    2025250    183200   20.7500  147.8700       8.7        87       870        96
VIS    2025250    183200   20.7600  147.8600       8.8        82       869        94
VIS    2025250    183200   20.7400  147.8400       8.4        84       872        97
VIS    2025250    183200   20.7400  147.8000       7.5        83       858        96
VIS    2025250    183200   20.7400  147.7700       7.5        97       774        98
VIS    2025250    183200   20.7500  147.7500       7.4        99       721        94
VIS    2025250    183200   20.7400  147.7200       7.4       105       713        91
VIS    2025250    183200   20.7500  147.7100       7.9       107       713        91
VIS    2025250    183200   20.7400  147.5400       8.5       104       702        92
VIS    2025250    183200   20.7400  147.5200       8.3       103       706        93
VIS    2025250    183200   20.7400  147.5000       8.6       103       706        98
VIS    2025250    183200   20.7400  147.4100      12.5        91       840        94
VIS    2025250    183200   20.7500  147.3600      11.1        92       962        91
VIS    2025250    183200   20.7500  147.3200       9.9        82       965        91
VIS    2025250    183200   20.7400  147.3000      10.7        76       939        93
VIS    2025250    183200   20.7500  147.2700      11.1        71       928        92
VIS    2025250    183200   20.7300  147.2500      10.4        75       910        91
VIS    2025250    183200   20.7400  147.1700      10.7        71       849        95
VIS    2025250    183200   20.7300  147.1600      10.8        71       851        95
VIS    2025250    183200   20.7300  147.1200      11.0        80       893        95
VIS    2025250    183200   20.7300  147.1100      11.0        82       893        92
VIS    2025250    183200   20.7500  147.0800      11.2        89       910        93
VIS    2025250    183200   20.7500  147.0200      10.8       113       804        90
VIS    2025250    183200   20.7500  147.0000      11.1       116       761        92
VIS    2025250    183200   20.7500  146.8400      10.7        98       728        94
VIS    2025250    183200   20.7400  146.8300      11.4        97       736        97
VIS    2025250    183200   20.7400  146.7900      10.9        90       753        95
VIS    2025250    183200   20.7500  146.7900      10.8        90       753        90
VIS    2025250    183200   20.7500  146.7600      11.3        89       793        93
VIS    2025250    183200   20.7400  146.7300      11.7        87       902        97
VIS    2025250    183200   20.7500  146.7000      12.6        86       932        97
VIS    2025250    183200   20.7400  146.6800      12.7        83       919        98
VIS    2025250    183200   20.7400  146.6200      11.1        79       896        93
VIS    2025250    183200   20.7500  146.6100      11.1        77       890        90
VIS    2025250    183200   20.7300  146.5800      13.2        67       913        91
VIS    2025250    183200   20.7300  146.5400      15.0        70       923        98
VIS    2025250    183200   20.7200  146.4900      12.6        72       986        90
VIS    2025250    183200   20.7300  146.3900      15.7        73       868        93
VIS    2025250    183200   20.7300  146.3900      15.6        73       877        94
VIS    2025250    183200   20.7200  146.3600      15.7        74       950        96
VIS    2025250    183200   20.7200  146.3400      15.2        79       950        95
VIS    2025250    183200   20.7400  146.2900      13.4        86       842        97
VIS    2025250    183200   20.7400  146.2900      13.7        87       842        90
VIS    2025250    183200   20.7200  146.0800      12.5        93       708        97
VIS    2025250    183200   20.7200  146.0400      13.8        84       708        93
VIS    2025250    183200   20.7200  146.0300      14.0        82       708        92
VIS    2025250    183200   20.7300  145.9700      13.8        74       825        90
VIS    2025250    183200   20.7400  145.9400      13.1        78       804        90
VIS    2025250    183200   20.7200  145.8900      13.8        82       832        92
VIS    2025250    183200   20.7200  145.8900      13.9        81       834        92
VIS    2025250    183200   20.7300  145.8600      12.9        85       814        95
VIS    2025250    183200   20.7400  145.8300      12.2        91       791        94
VIS    2025250    183200   20.7200  145.8000      13.3        87       776        94
VIS    2025250    183200   20.7100  142.7100      12.3       125       851        94
VIS    2025250    183200   20.7100  142.6900      12.2       123       857        93
VIS    2025250    183200   20.7100  142.6600      12.4       127       856        93
VIS    2025250    183200   20.7100  142.6600      12.4       128       856        93
VIS    2025250    183200   20.6900  142.5000      10.7       128       883        90
VIS    2025250    183200   20.7000  142.4700      10.9       130       889        90
VIS    2025250    183200   20.6900  142.4200       9.9       126       896        90
VIS    2025250    183200   20.7100  142.4100       9.9       128       900        91
VIS    2025250    183200   20.7100  142.3900       9.6       130       903        91
VIS    2025250    183200   20.7700  151.6000       6.7        75       990        96
VIS    2025250    183200   20.7800  151.5600       6.9        77       980        92
VIS    2025250    183200   20.7600  151.0400       6.0        73       973        98
VIS    2025250    183200   20.7400  148.6800      11.2        82       904        90
VIS    2025250    183200   20.7300  148.6500      10.4        80       897        95
VIS    2025250    183200   20.7200  148.6300       9.9        75       893        98
VIS    2025250    183200   20.7300  148.5900      10.0        75       890        99
VIS    2025250    183200   20.7200  148.5700       9.8        78       909        98
VIS    2025250    183200   20.7300  148.5500       9.6        78       927        95
VIS    2025250    183200   20.7400  148.4100       8.7        74       973        94
VIS    2025250    183200   20.7400  148.3800       8.5        76       977        94
VIS    2025250    183200   20.7300  148.3600       8.7        75       977        93
VIS    2025250    183200   20.7200  148.3500       8.7        76       977        94
VIS    2025250    183200   20.7300  148.2300       8.3        79       973        93
VIS    2025250    183200   20.7200  148.2200       8.6        74       979        95
VIS    2025250    183200   20.7200  148.1900       9.5        65       950        97
VIS    2025250    183200   20.7300  148.1700       9.6        66       942        92
VIS    2025250    183200   20.7300  148.1500       9.8        69       943        91
VIS    2025250    183200   20.7300  148.1200      10.6        71       959        96
VIS    2025250    183200   20.7400  148.1000      10.9        67       965        96
VIS    2025250    183200   20.7300  148.0700       9.8        60       971        95
VIS    2025250    183200   20.7300  148.0400       8.5        81       975        92
VIS    2025250    183200   20.7300  148.0200       8.6        79       968        90
VIS    2025250    183200   20.7200  147.9700       7.7        83       927        91
VIS    2025250    183200   20.7400  147.9100       9.1        87       871        99
VIS    2025250    183200   20.7200  147.8800       9.4        96       872        93
VIS    2025250    183200   20.7100  147.8700       9.2        96       872        93
VIS    2025250    183200   20.7200  147.8500       8.0        91       870        96
VIS    2025250    183200   20.7100  147.8200       7.4        87       860        96
VIS    2025250    183200   20.7300  147.8000       7.4        83       858        96
VIS    2025250    183200   20.7300  147.7600       7.3       100       721        99
VIS    2025250    183200   20.7100  147.7300       7.3       101       717        93
VIS    2025250    183200   20.7100  147.7200       7.6       103       713        90
VIS    2025250    183200   20.7100  147.6800       8.6       108       701        96
VIS    2025250    183200   20.7200  147.5600       8.9       101       702        98
VIS    2025250    183200   20.7300  147.5300       8.3       102       707        98
VIS    2025250    183200   20.7100  147.5000       8.9       103       712        98
VIS    2025250    183200   20.7300  147.4900       8.7       102       707        97
VIS    2025250    183200   20.7300  147.4600       9.5        98       714        92
VIS    2025250    183200   20.7100  147.4200      12.9        82       789        91
VIS    2025250    183200   20.7200  147.3900      12.3        88       903        94
VIS    2025250    183200   20.7100  147.3400      10.0        88       984        91
VIS    2025250    183200   20.7100  147.3100      11.1        74       939        97
VIS    2025250    183200   20.7300  147.2800      11.4        69       927        91
VIS    2025250    183200   20.7200  147.2600      10.6        72       910        90
VIS    2025250    183200   20.7200  147.1500      10.9        68       870        96
VIS    2025250    183200   20.7100  147.1300      10.3        75       889        94
VIS    2025250    183200   20.7300  147.1100      10.8        82       903        91
VIS    2025250    183200   20.7100  147.0800      10.7        86       931        93
VIS    2025250    183200   20.7200  147.0600      10.5        98       926        90
VIS    2025250    183200   20.7200  147.0200      10.1       106       778        95
VIS    2025250    183200   20.7100  147.0000      10.2       107       761        98
VIS    2025250    183200   20.7000  146.8400      12.3        96       735        95
VIS    2025250    183200   20.7200  146.8200      11.6        93       741        95
VIS    2025250    183200   20.7100  146.8000      11.8        92       756        95
VIS    2025250    183200   20.7200  146.7700      11.5        91       803        97
VIS    2025250    183200   20.7000  146.7300      11.2        90       849        99
VIS    2025250    183200   20.7100  146.7000      10.8        83       916        96
VIS    2025250    183200   20.7100  146.6800      11.8        79       916        98
VIS    2025250    183200   20.7200  146.6800      11.8        79       916        97
VIS    2025250    183200   20.7100  146.6300      11.3        81       896        96
VIS    2025250    183200   20.7200  146.5600      13.9        69       915        95
VIS    2025250    183200   20.7200  146.3900      15.6        73       913        97
VIS    2025250    183200   20.7000  146.3700      15.7        77       947        95
VIS    2025250    183200   20.7200  146.3400      15.2        80       947        96
VIS    2025250    183200   20.7000  146.3300      14.5        83       873        94
VIS    2025250    183200   20.7100  146.0800      12.3        90       744        95
VIS    2025250    183200   20.7100  146.0800      12.1        92       708        97
VIS    2025250    183200   20.7100  146.0400      13.7        84       708        93
VIS    2025250    183200   20.6900  146.0000      12.7        84       843        95
VIS    2025250    183200   20.7000  145.9700      12.7        77       825        91
VIS    2025250    183200   20.7000  145.9500      13.1        79       808        92
VIS    2025250    183200   20.6900  145.9100      13.1        86       803        96
VIS    2025250    183200   20.7100  145.8900      14.0        81       832        93
VIS    2025250    183200   20.6900  145.8800      14.3        80       832        93
VIS    2025250    183200   20.7000  145.8500      13.2        82       821        92
VIS    2025250    183200   20.6900  142.4900      10.8       128       883        91
VIS    2025250    183200   20.6800  142.4100      10.1       122       898        91
VIS    2025250    183200   20.6700  142.3900      10.2       120       901        95
VIS    2025250    183200   20.6700  142.3700      10.1       124       902        94
VIS    2025250    183200   20.6700  142.3500      10.1       130       907        91
VIS    2025250    183200   20.7600  151.5900       6.3        71       990        99
VIS    2025250    183200   20.7400  151.5800       6.1        71       984        96
VIS    2025250    183200   20.7400  151.5300       6.1        74       955        98
VIS    2025250    183200   20.7400  151.0600       6.3        76       956        97
VIS    2025250    183200   20.7400  151.0400       6.0        77       956        98
VIS    2025250    183200   20.7000  148.7100      10.3        78       999        94
VIS    2025250    183200   20.7000  148.6700       9.7        82       926        93
VIS    2025250    183200   20.7100  148.6400       9.6        77       897        94
VIS    2025250    183200   20.7000  148.6300       9.4        73       894        94
VIS    2025250    183200   20.7200  148.5900      10.0        74       890       100
VIS    2025250    183200   20.7000  148.5700       9.5        76       897        99
VIS    2025250    183200   20.7100  148.5600       9.5        77       916        97
VIS    2025250    183200   20.7000  148.2200       8.8        77       983        92
VIS    2025250    183200   20.7000  148.1900       9.4        70       964        94
VIS    2025250    183200   20.7100  148.1800       9.5        65       950        96
VIS    2025250    183200   20.7100  148.1400       9.6        69       959        93
VIS    2025250    183200   20.7000  148.1100       9.2        70       973        92
VIS    2025250    183200   20.7000  148.0800       8.8        65       971        94
VIS    2025250    183200   20.6900  147.9900       8.9        73       962        93
VIS    2025250    183200   20.7000  147.9600       7.4        70       927        95
VIS    2025250    183200   20.7000  147.9400       7.8        70       875        94
VIS    2025250    183200   20.6900  147.9200       8.5        83       867        95
VIS    2025250    183200   20.6900  147.8900       9.3        99       872        94
VIS    2025250    183200   20.7100  147.8800       9.4        98       872        93
VIS    2025250    183200   20.7000  147.8500       8.5        98       869        92
VIS    2025250    183200   20.7100  147.8200       7.4        89       858        95
VIS    2025250    183200   20.7000  147.8000       6.9        88       827        92
VIS    2025250    183200   20.6900  147.7700       7.0       100       809        92
VIS    2025250    183200   20.6900  147.7500       7.3       102       727        95
VIS    2025250    183200   20.7100  147.7200       7.5       103       713        91
VIS    2025250    183200   20.6900  147.6900       8.3       109       701        96
VIS    2025250    183200   20.6900  147.6600       8.4       111       700        98
VIS    2025250    183200   20.7000  147.5900       8.7       101       700        95
VIS    2025250    183200   20.7000  147.5600       8.8       100       702        97
VIS    2025250    183200   20.6900  147.5300       8.5       101       710        99
VIS    2025250    183200   20.6900  147.5100       8.8       103       716        98
VIS    2025250    183200   20.6900  147.5000       9.2       103       717        98
VIS    2025250    183200   20.6900  147.4600       9.9        90       724        93
VIS    2025250    183200   20.6800  147.4100      11.7        63       834        90
VIS    2025250    183200   20.6800  147.4000      11.5        64       836        90
VIS    2025250    183200   20.6900  147.3700      10.1        78       918        94
VIS    2025250    183200   20.7000  147.3500       9.9        88       975        91
VIS    2025250    183200   20.6900  147.3200      11.3        78       937        93
VIS    2025250    183200   20.6900  147.2900      11.8        63       920        96
VIS    2025250    183200   20.6900  147.2700      10.6        66       910        93
VIS    2025250    183200   20.6800  147.2400      10.2        77       830        91
VIS    2025250    183200   20.6800  147.1800      12.5        62       878        93
VIS    2025250    183200   20.6900  147.1600      12.3        63       895        92
VIS    2025250    183200   20.7000  147.1300      10.5        77       897        92
VIS    2025250    183200   20.7000  147.1300      10.1        78       903        91
VIS    2025250    183200   20.6900  147.1000      10.4        82       903        94
VIS    2025250    183200   20.7000  147.0700      10.9        88       895        96
VIS    2025250    183200   20.7000  147.0500      10.5        95       846        96
VIS    2025250    183200   20.7000  147.0100      10.0       102       764        99
VIS    2025250    183200   20.6900  146.9800      10.1       105       702        97
VIS    2025250    183200   20.6900  146.9800      10.2       107       702        97
VIS    2025250    183200   20.7000  146.8300      12.3        96       740        96
VIS    2025250    183200   20.7000  146.8100      12.1        95       747        96
VIS    2025250    183200   20.6800  146.7800      12.2        93       756        95
VIS    2025250    183200   20.6800  146.7800      12.2        92       764        95
VIS    2025250    183200   20.6800  146.7300      11.0        84       849        99
VIS    2025250    183200   20.6800  146.7100      11.5        77       912        98
VIS    2025250    183200   20.6900  146.7000      11.5        79       915        98
VIS    2025250    183200   20.6800  146.6600      13.6        75       902        97
VIS    2025250    183200   20.6900  146.6400      12.6        77       896        94
VIS    2025250    183200   20.6800  146.4700      11.8        77       965        95
VIS    2025250    183200   20.6800  146.4300      13.3        76       870        91
VIS    2025250    183200   20.6900  146.4100      15.5        71       913        91
VIS    2025250    183200   20.6800  146.4000      15.9        75       930        94
VIS    2025250    183200   20.6800  146.3700      15.6        78       905        93
VIS    2025250    183200   20.6800  146.3300      15.1        78       873        90
VIS    2025250    183200   20.6900  146.3300      15.0        80       873        91
VIS    2025250    183200   20.6700  146.3000      15.6        78       933        97
VIS    2025250    183200   20.6800  146.2800      14.9        81       781        91
VIS    2025250    183200   20.6800  146.1600      13.2        88       799        95
VIS    2025250    183200   20.6800  146.1600      13.1        87       799        94
VIS    2025250    183200   20.6800  146.0900      13.1        85       758        93
VIS    2025250    183200   20.6700  146.0600      12.1        89       759        92
VIS    2025250    183200   20.6700  146.0300      13.5        81       799        91
VIS    2025250    183200   20.6900  146.0000      12.6        86       837        94
VIS    2025250    183200   20.6700  145.9600      12.4        83       800        94
VIS    2025250    183200   20.6700  145.9400      12.4        87       797        95
VIS    2025250    183200   20.6800  145.9200      12.8        91       797        97
VIS    2025250    183200   20.6700  145.8900      13.1        89       803        96
VIS    2025250    183200   20.6700  145.8800      13.3        87       796        94
VIS    2025250    183200   20.6500  142.5100      10.7       126       877        92
VIS    2025250    183200   20.6400  142.5000      10.8       126       876        95
VIS    2025250    183200   20.6500  142.4800      11.2       127       882        93
VIS    2025250    183200   20.6600  142.3800      10.8       121       902        97
VIS    2025250    183200   20.6400  142.3600      11.6       121       906        96
VIS    2025250    183200   20.6400  142.3500      11.4       121       912        95
VIS    2025250    183200   20.7400  151.5900       5.5        67      1000        94
VIS    2025250    183200   20.7300  151.5600       6.0        76       977        94
VIS    2025250    183200   20.6700  148.6800       9.3        76       970        97
VIS    2025250    183200   20.6800  148.6500       9.2        80       922        93
VIS    2025250    183200   20.6900  148.6200       9.3        72       894        94
VIS    2025250    183200   20.6700  148.5900       9.5        75       886       100
VIS    2025250    183200   20.6800  148.5800       9.5        75       886       100
VIS    2025250    183200   20.6900  148.5600       9.4        76       916        98
VIS    2025250    183200   20.6900  148.2200       8.9        80       988        92
VIS    2025250    183200   20.6800  148.1800       9.5        71       975        93
VIS    2025250    183200   20.6800  148.0400       9.8        70       971        90
VIS    2025250    183200   20.6800  148.0200      10.0        70       967        90
VIS    2025250    183200   20.6900  147.9900       9.0        72       962        95
VIS    2025250    183200   20.6800  147.9600       7.5        70       934        96
VIS    2025250    183200   20.6700  147.9500       7.5        73       881        95
VIS    2025250    183200   20.6800  147.9200       8.3        81       865        96
VIS    2025250    183200   20.6700  147.9000       8.8        94       867        95
VIS    2025250    183200   20.6700  147.8600       8.4        99       872        93
VIS    2025250    183200   20.6700  147.8400       8.2       101       854        93
VIS    2025250    183200   20.6600  147.8200       7.8        99       824        94
VIS    2025250    183200   20.6800  147.7600       7.3       103       761        94
VIS    2025250    183200   20.6800  147.7400       7.6       105       717        95
VIS    2025250    183200   20.6800  147.7300       7.7       105       713        95
VIS    2025250    183200   20.6800  147.6800       8.3       110       701        97
VIS    2025250    183200   20.6700  147.6600       8.2       111       701        98
VIS    2025250    183200   20.6800  147.5600       8.7       101       705        97
VIS    2025250    183200   20.6800  147.5400       8.6       102       710        99
VIS    2025250    183200   20.6800  147.5100       9.1       103       717        98
VIS    2025250    183200   20.6700  147.5000       9.5       103       722        98
VIS    2025250    183200   20.6800  147.4600       9.9        91       734        93
VIS    2025250    183200   20.6700  147.4400      10.1        76       803        91
VIS    2025250    183200   20.6800  147.4000      11.3        63       836        91
VIS    2025250    183200   20.6600  147.3700      10.2        75       855        94
VIS    2025250    183200   20.6700  147.3400      10.0        97       923        91
VIS    2025250    183200   20.6600  147.2900      11.0        73       896        99
VIS    2025250    183200   20.6600  147.2300      10.8        80       828        94
VIS    2025250    183200   20.6600  147.2200      10.9        80       828        94
VIS    2025250    183200   20.6800  147.1800      12.5        62       878        92
VIS    2025250    183200   20.6700  147.1800      12.6        62       895        91
VIS    2025250    183200   20.6600  147.1100      11.0        74       885        92
VIS    2025250    183200   20.6700  147.1000      10.7        80       872        95
VIS    2025250    183200   20.6600  147.0700      11.0        83       846        98
VIS    2025250    183200   20.6800  147.0400      10.0        93       831        98
VIS    2025250    183200   20.6700  147.0100      10.5        95       801        96
VIS    2025250    183200   20.6700  147.0000      10.5        95       778        96
VIS    2025250    183200   20.6600  146.9700      11.3       100       732        97
VIS    2025250    183200   20.6700  146.9400      11.0       105       721        98
VIS    2025250    183200   20.6700  146.9200      11.3       103       721        96
VIS    2025250    183200   20.6500  146.8900      13.0        97       727        92
VIS    2025250    183200   20.6600  146.8700      14.3        97       729        91
VIS    2025250    183200   20.6600  146.8300      12.9        96       745        94
VIS    2025250    183200   20.6700  146.8300      12.5        96       745        95
VIS    2025250    183200   20.6600  146.7800      11.2        89       756        96
VIS    2025250    183200   20.6600  146.7800      11.2        88       756        95
VIS    2025250    183200   20.6600  146.7300      11.1        76       849        98
VIS    2025250    183200   20.6600  146.7200      11.1        74       896        98
VIS    2025250    183200   20.6500  146.6900      12.1        72       912        97
VIS    2025250    183200   20.6700  146.6600      13.5        76       903        98
VIS    2025250    183200   20.6700  146.6400      13.4        77       896        97
VIS    2025250    183200   20.6600  146.6100      12.5        74       912        98
VIS    2025250    183200   20.6700  146.6000      12.5        75       912        99
VIS    2025250    183200   20.6500  146.5200      14.5        70       941        98
VIS    2025250    183200   20.6500  146.4900      13.8        75       944        99
VIS    2025250    183200   20.6700  146.4600      12.2        78       877        99
VIS    2025250    183200   20.6600  146.4300      14.0        77       915        99
VIS    2025250    183200   20.6600  146.4300      14.4        77       877        96
VIS    2025250    183200   20.6500  146.3900      16.0        77       946        96
VIS    2025250    183200   20.6700  146.3700      15.6        77       905        93
VIS    2025250    183200   20.6500  146.3500      15.1        70       905        90
VIS    2025250    183200   20.6500  146.3100      15.8        74       947        98
VIS    2025250    183200   20.6500  146.3000      15.8        75       941        97
VIS    2025250    183200   20.6500  146.2600      15.0        78       877        95
VIS    2025250    183200   20.6500  146.2400      14.5        79       857        96
VIS    2025250    183200   20.6500  146.2200      13.9        82       887        99
VIS    2025250    183200   20.6500  146.2000      13.7        86       891        99
VIS    2025250    183200   20.6700  146.1700      13.2        90       856        99
VIS    2025250    183200   20.6700  146.1500      13.2        89       799        92
VIS    2025250    183200   20.6500  146.1100      14.2        84       759        91
VIS    2025250    183200   20.6500  146.0800      13.0        87       758        94
VIS    2025250    183200   20.6600  146.0600      12.1        91       760        93
VIS    2025250    183200   20.6500  146.0200      13.5        85       828        93
VIS    2025250    183200   20.6600  145.9800      12.2        91       823        98
VIS    2025250    183200   20.6600  145.9600      12.3        84       797        94
VIS    2025250    183200   20.6500  145.9400      12.4        89       797        96
VIS    2025250    183200   20.6600  145.9300      12.4        94       797        98
VIS    2025250    183200   20.6400  145.8800      12.2        93       790        97
VIS    2025250    183200   20.6600  145.8800      12.7        90       790        96
VIS    2025250    183200   20.6200  142.4600      10.8       124       881        94
VIS    2025250    183200   20.6400  142.4500      11.4       127       884        92
VIS    2025250    183200   20.6200  142.4100      11.1       122       890        94
VIS    2025250    183200   20.6200  142.4000      11.6       122       893        95
VIS    2025250    183200   20.6400  142.3600      11.7       120       907        96
VIS    2025250    183200   20.7100  151.5600       6.1        80       977        90
VIS    2025250    183200   20.6600  148.6800       8.8        73       970        98
VIS    2025250    183200   20.6500  148.6600       9.3        76       952        96
VIS    2025250    183200   20.6600  148.6200       9.8        76       900        98
VIS    2025250    183200   20.6700  148.5900       9.6        75       886       100
VIS    2025250    183200   20.6500  148.5700       9.5        73       886        98
VIS    2025250    183200   20.6600  148.2300       9.6        77       994        91
VIS    2025250    183200   20.6500  148.2000       9.7        71       994        96
VIS    2025250    183200   20.6500  148.1800       9.7        70       994        94
VIS    2025250    183200   20.6500  148.1600       9.7        68       993        94
VIS    2025250    183200   20.6600  148.1000       7.8        67       976        94
VIS    2025250    183200   20.6400  148.0700       9.5        67       997        97
VIS    2025250    183200   20.6600  148.0700       8.5        66       979        94
VIS    2025250    183200   20.6400  148.0200      10.6        75       968        93
VIS    2025250    183200   20.6500  148.0000      10.5        69       961        96
VIS    2025250    183200   20.6400  147.9900       9.2        73       956        93
VIS    2025250    183200   20.6500  147.9500       7.8        80       881        92
VIS    2025250    183200   20.6600  147.9200       8.4        86       865        93
VIS    2025250    183200   20.6500  147.9100       8.6        89       867        96
VIS    2025250    183200   20.6500  147.8800       8.0        92       873        95
VIS    2025250    183200   20.6500  147.8500       8.0       100       863        92
VIS    2025250    183200   20.6400  147.8300       7.5       100       841        93
VIS    2025250    183200   20.6400  147.7900       7.1       103       809        90
VIS    2025250    183200   20.6500  147.7900       7.2       105       809        91
VIS    2025250    183200   20.6400  147.7500       7.9       109       712        92
VIS    2025250    183200   20.6500  147.7400       7.7       109       712        93
VIS    2025250    183200   20.6500  147.5800       9.2       103       700        96
VIS    2025250    183200   20.6500  147.5600       9.1       101       702        97
VIS    2025250    183200   20.6400  147.5300       9.4        92       722        96
VIS    2025250    183200   20.6400  147.5100       9.3        87       747        94
VIS    2025250    183200   20.6500  147.4700       9.6        95       752        95
VIS    2025250    183200   20.6400  147.4400       9.9        89       830        97
VIS    2025250    183200   20.6300  147.4400      10.2        90       830        98
VIS    2025250    183200   20.6500  147.3800      10.2        79       834        97
VIS    2025250    183200   20.6500  147.3600       9.3        82       855        98
VIS    2025250    183200   20.6500  147.3200       9.3        90       864        96
VIS    2025250    183200   20.6500  147.3000      10.2        83       896        92
VIS    2025250    183200   20.6400  147.2200      11.1        81       836        95
VIS    2025250    183200   20.6400  147.2100      11.1        83       836        95
VIS    2025250    183200   20.6500  147.1300      12.2        64       895        92
VIS    2025250    183200   20.6300  147.1100      11.1        78       844        97
VIS    2025250    183200   20.6500  147.0700      10.8        86       843       100
VIS    2025250    183200   20.6400  147.0400      10.9        91       838        96
VIS    2025250    183200   20.6300  147.0300      11.4        95       832        96
VIS    2025250    183200   20.6400  147.0000      11.0        94       801        95
VIS    2025250    183200   20.6500  146.9700      11.7        97       744        96
VIS    2025250    183200   20.6400  146.9400      11.1        96       732        96
VIS    2025250    183200   20.6500  146.9400      10.9        98       732        96
VIS    2025250    183200   20.6400  146.9100      11.4        96       732        94
VIS    2025250    183200   20.6400  146.8800      14.2        95       729        90
VIS    2025250    183200   20.6400  146.8400      13.7        94       742        91
VIS    2025250    183200   20.6300  146.8200      11.8        90       756        95
VIS    2025250    183200   20.6300  146.7900       9.0        82       773        94
VIS    2025250    183200   20.6300  146.7800       9.1        78       781        91
VIS    2025250    183200   20.6400  146.7500      10.8        76       813        91
VIS    2025250    183200   20.6400  146.7300      11.2        73       870        96
VIS    2025250    183200   20.6400  146.7000      11.5        71       903        96
VIS    2025250    183200   20.6500  146.6800      11.9        72       912        97
VIS    2025250    183200   20.6400  146.6500      11.7        74       912        95
VIS    2025250    183200   20.6300  146.6300      11.9        74       912        96
VIS    2025250    183200   20.6400  146.5700      11.9        80       918        94
VIS    2025250    183200   20.6400  146.5700      12.3        78       918        96
VIS    2025250    183200   20.6200  146.5200      12.1        74       941        97
VIS    2025250    183200   20.6200  146.5100      11.9        75       941        97
VIS    2025250    183200   20.6200  146.4700      13.2        69       929        91
VIS    2025250    183200   20.6300  146.4500      13.7        68       915        95
VIS    2025250    183200   20.6200  146.4300      14.1        70       915        95
VIS    2025250    183200   20.6400  146.4000      16.3        79       946        96
VIS    2025250    183200   20.6400  146.3800      15.7        76       923        95
VIS    2025250    183200   20.6400  146.3500      14.4        70       915        93
VIS    2025250    183200   20.6400  146.3300      14.4        69       933        93
VIS    2025250    183200   20.6400  146.3000      14.9        76       933        96
VIS    2025250    183200   20.6200  146.2700      13.8        77       918        98
VIS    2025250    183200   20.6400  146.2700      14.9        77       908        95
VIS    2025250    183200   20.6300  146.2300      14.0        81       908        94
VIS    2025250    183200   20.6400  146.2000      13.8        85       893        99
VIS    2025250    183200   20.6400  146.1800      13.9        85       891        95
VIS    2025250    183200   20.6400  146.1700      13.8        89       839        93
VIS    2025250    183200   20.6200  146.1400      12.8        90       779        91
VIS    2025250    183200   20.6200  146.1000      12.9        94       756        95
VIS    2025250    183200   20.6300  146.0700      11.9        96       756        94
VIS    2025250    183200   20.6200  146.0200      12.9        88       813        96
VIS    2025250    183200   20.6200  146.0200      12.9        88       813        96
VIS    2025250    183200   20.6200  145.9900      12.7        90       813        98
VIS    2025250    183200   20.6300  145.9600      12.7        91       797        97
VIS    2025250    183200   20.6200  145.9400      12.9        91       797        97
VIS    2025250    183200   20.6200  145.9100      12.4        92       797        97
VIS    2025250    183200   20.6000  142.4300      10.7       121       885        90
VIS    2025250    183200   20.6000  142.4200      10.7       122       887        91
VIS    2025250    183200   20.6000  142.3700      11.6       121       897        95
VIS    2025250    183200   20.6100  142.3700      12.2       119       904        95
VIS    2025250    183200   20.6300  149.0800       8.2        72       978        96
VIS    2025250    183200   20.6400  149.0600       8.2        71       978        97
VIS    2025250    183200   20.6400  148.6700       9.3        71       970        97
VIS    2025250    183200   20.6400  148.6700       9.4        72       970        95
VIS    2025250    183200   20.6400  148.6200      10.2        76       909        97
VIS    2025250    183200   20.6400  148.6000      10.0        73       896        99
VIS    2025250    183200   20.6400  148.5800       9.6        72       890        98
VIS    2025250    183200   20.6400  148.5500       9.1        69       934        95
VIS    2025250    183200   20.6300  148.2300       8.6        75      1000        95
VIS    2025250    183200   20.6300  148.2000       9.4        70       996        98
VIS    2025250    183200   20.6300  148.1500       9.2        68       994        91
VIS    2025250    183200   20.6200  148.1200       8.6        65       993        90
VIS    2025250    183200   20.6200  148.0600       9.7        72       985        97
VIS    2025250    183200   20.6300  148.0500      10.2        76       984        97
VIS    2025250    183200   20.6200  148.0200       9.9        78       961        91
VIS    2025250    183200   20.6200  148.0000       9.5        76       948        91
VIS    2025250    183200   20.6400  147.9800       8.7        75       950        90
VIS    2025250    183200   20.6400  147.9600       7.9        80       898        92
VIS    2025250    183200   20.6300  147.9300       8.7        89       867        93
VIS    2025250    183200   20.6100  147.8900       8.1        91       866        95
VIS    2025250    183200   20.6200  147.8700       7.7        95       865        92
VIS    2025250    183200   20.6300  147.8600       7.4        98       865        90
VIS    2025250    183200   20.6300  147.8200       7.0        96       819        93
VIS    2025250    183200   20.6300  147.7900       7.3       101       755        94
VIS    2025250    183200   20.6200  147.7700       7.9       100       712        94
VIS    2025250    183200   20.6300  147.7600       7.9       107       712        92
VIS    2025250    183200   20.6200  147.6000      10.6       106       705        91
VIS    2025250    183200   20.6200  147.5700      10.9       105       706        93
VIS    2025250    183200   20.6200  147.5400       9.6        97       720        98
VIS    2025250    183200   20.6200  147.5100       9.1        80       748        92
VIS    2025250    183200   20.6100  147.5000       9.3        70       806        91
VIS    2025250    183200   20.6200  147.4800       8.9        77       806        93
VIS    2025250    183200   20.6100  147.4500       9.3        84       780        96
VIS    2025250    183200   20.6200  147.4300      11.3        97       824        94
VIS    2025250    183200   20.6300  147.4000      11.7        98       786        90
VIS    2025250    183200   20.6100  147.3700       8.7        92       786        97
VIS    2025250    183200   20.6200  147.3400       9.7        93       826        98
VIS    2025250    183200   20.6200  147.3200       9.6        79       826        94
VIS    2025250    183200   20.6200  147.1600      11.8        65       905        98
VIS    2025250    183200   20.6100  147.1600      12.0        64       905        98
VIS    2025250    183200   20.6300  147.1300      11.6        70       895        99
VIS    2025250    183200   20.6300  147.1100      11.1        80       844        97
VIS    2025250    183200   20.6000  147.0700      11.8        87       843        99
VIS    2025250    183200   20.6000  147.0400      11.8        93       834        99
VIS    2025250    183200   20.6200  147.0300      11.6        95       832        97
VIS    2025250    183200   20.6100  147.0000      10.8        93       798        99
VIS    2025250    183200   20.6200  146.9700      10.8        91       740        96
VIS    2025250    183200   20.6100  146.9400      10.0        89       742        94
VIS    2025250    183200   20.6000  146.9300       9.8        87       742        92
VIS    2025250    183200   20.6100  146.8900      12.5        91       729        91
VIS    2025250    183200   20.6200  146.8400      13.7        90       745        91
VIS    2025250    183200   20.6100  146.8100      10.8        84       773        94
VIS    2025250    183200   20.6100  146.8000       9.2        77       782        90
VIS    2025250    183200   20.6100  146.7200      11.3        72       886        90
VIS    2025250    183200   20.6100  146.6900      12.1        68       913        92
VIS    2025250    183200   20.6100  146.6700      11.7        68       918        94
VIS    2025250    183200   20.6000  146.6000      12.5        74       923        96
VIS    2025250    183200   20.6100  146.5600      13.8        68       933        95
VIS    2025250    183200   20.6000  146.5500      12.8        72       943        98
VIS    2025250    183200   20.6000  146.5300      11.6        78       943        95
VIS    2025250    183200   20.6100  146.5000      11.5        76       933        93
VIS    2025250    183200   20.6100  146.4400      13.8        68       915        90
VIS    2025250    183200   20.6200  146.4300      14.0        69       915        94
VIS    2025250    183200   20.6000  146.3900      15.0        72       949        98
VIS    2025250    183200   20.6100  146.3800      14.6        74       935        94
VIS    2025250    183200   20.6000  146.2900      12.7        77       918        99
VIS    2025250    183200   20.6000  146.2600      12.8        77       901        97
VIS    2025250    183200   20.6200  146.2500      13.6        79       904        96
VIS    2025250    183200   20.6000  146.2100      13.4        83       912        99
VIS    2025250    183200   20.6100  146.1900      14.4        79       908        97
VIS    2025250    183200   20.6100  146.1800      13.6        78       906        92
VIS    2025250    183200   20.6100  146.1400      12.0        88       773        92
VIS    2025250    183200   20.6100  146.1000      13.1        91       756        93
VIS    2025250    183200   20.6100  146.0700      11.7        96       756        92
VIS    2025250    183200   20.6000  146.0200      12.7        85       807        91
VIS    2025250    183200   20.5900  145.9900      12.7        89       807        97
VIS    2025250    183200   20.6000  145.9700      12.5        93       796        97
VIS    2025250    183200   20.6100  145.9600      13.0        91       796        95
VIS    2025250    183200   20.5900  142.4300      10.9       124       885        90
VIS    2025250    183200   20.5700  142.3900      10.9       127       887        93
VIS    2025250    183200   20.5700  142.3800      10.9       126       888        94
VIS    2025250    183200   20.5700  142.3600      10.5       124       892        94
VIS    2025250    183200   20.6200  150.5200       6.9        82       993        90
VIS    2025250    183200   20.6200  149.0900       8.3        72       978        91
VIS    2025250    183200   20.6000  148.6200      10.3        70       972        93
VIS    2025250    183200   20.6000  148.5800      10.1        71       898        98
VIS    2025250    183200   20.6200  148.5600       9.4        70       897        97
VIS    2025250    183200   20.5900  148.2100       9.1        61       989        97
VIS    2025250    183200   20.6000  148.0900       8.9        70       985        93
VIS    2025250    183200   20.6000  148.0600       9.4        73       967        93
VIS    2025250    183200   20.6100  148.0500       9.8        75       967        94
VIS    2025250    183200   20.6100  148.0200       9.6        78       961        91
VIS    2025250    183200   20.6000  148.0000       8.9        75       948        92
VIS    2025250    183200   20.6100  147.9700       8.1        79       909        94
VIS    2025250    183200   20.6100  147.9400       7.9        86       867        95
VIS    2025250    183200   20.5900  147.9100       8.0        83       864        90
VIS    2025250    183200   20.6000  147.9000       8.1        88       864        97
VIS    2025250    183200   20.6100  147.8700       8.1        94       863        95
VIS    2025250    183200   20.6100  147.8500       7.3        94       863        90
VIS    2025250    183200   20.6100  147.7900       7.5        98       718        97
VIS    2025250    183200   20.6100  147.7600       8.4       100       701        90
VIS    2025250    183200   20.6000  147.6100      10.1       103       705        92
VIS    2025250    183200   20.5900  147.6000      10.9       104       709        91
VIS    2025250    183200   20.5900  147.5700      11.7       105       722        95
VIS    2025250    183200   20.6000  147.5500       9.7       102       723        97
VIS    2025250    183200   20.6000  147.5300       9.1        95       747        98
VIS    2025250    183200   20.6000  147.4400       9.4        87       780        97
VIS    2025250    183200   20.5900  147.4200      10.4       104       748        98
VIS    2025250    183200   20.6000  147.3300      11.2        90       816        92
VIS    2025250    183200   20.6000  147.1700      11.1        63       891        96
VIS    2025250    183200   20.6000  147.1500      12.0        64       905        98
VIS    2025250    183200   20.5900  147.1300      12.0        79       885        98
VIS    2025250    183200   20.5800  147.0800      11.5        86       843       100
VIS    2025250    183200   20.5800  147.0800      11.5        87       843       100
VIS    2025250    183200   20.5800  147.0400      12.6        90       834        97
VIS    2025250    183200   20.5800  147.0200      12.0        90       820        99
VIS    2025250    183200   20.6000  146.9900      10.5        90       756        97
VIS    2025250    183200   20.5900  146.9800      10.3        88       756        96
VIS    2025250    183200   20.5800  146.9500      10.0        86       761        92
VIS    2025250    183200   20.6000  146.9300       9.5        86       743        92
VIS    2025250    183200   20.5800  146.8100      11.4        78       764        90
VIS    2025250    183200   20.6000  146.8000       9.3        76       793        92
VIS    2025250    183200   20.5800  146.7500       9.3        76       817        90
VIS    2025250    183200   20.5900  146.6300      11.9        66       923        92
VIS    2025250    183200   20.5800  146.6000      11.6        71       929        97
VIS    2025250    183200   20.5700  146.5700      12.6        72       943        99
VIS    2025250    183200   20.5900  146.5500      12.6        74       943        98
VIS    2025250    183200   20.5900  146.5300      11.5        79       947        94
VIS    2025250    183200   20.5700  146.4200      13.3        78       932        97
VIS    2025250    183200   20.5700  146.4000      14.2        73       940        97
VIS    2025250    183200   20.5800  146.3800      14.1        72       930        94
VIS    2025250    183200   20.5700  146.2800      13.5        74       916        91
VIS    2025250    183200   20.5800  146.1900      12.2        84       908        96
VIS    2025250    183200   20.5800  146.1800      12.1        82       906        96
VIS    2025250    183200   20.5700  146.1600      12.4        75       846        94
VIS    2025250    183200   20.5800  146.1100      12.6        93       766        95
VIS    2025250    183200   20.5700  146.0700      12.1        97       799        99
VIS    2025250    183200   20.5700  146.0400      12.2        97       824        98
VIS    2025250    183200   20.5900  146.0200      12.8        85       813        92
VIS    2025250    183200   20.5900  145.9900      12.8        88       807        97
VIS    2025250    183200   20.5800  145.9800      12.8        91       796        97
VIS    2025250    183200   20.5600  142.4000      11.4       130       886        92
VIS    2025250    183200   20.5400  142.3600      10.3       127       892        94
VIS    2025250    183200   20.5500  142.3600      10.2       126       892        94
VIS    2025250    183200   20.5800  149.5300       8.2        74       953        96
VIS    2025250    183200   20.5900  148.6200      10.5        71       972        95
VIS    2025250    183200   20.5700  148.5800      10.2        69       966        98
VIS    2025250    183200   20.5800  148.5700      10.1        69       904        99
VIS    2025250    183200   20.5700  148.5300       9.5        67       927        96
VIS    2025250    183200   20.5900  148.2100       9.3        59       989        97
VIS    2025250    183200   20.5700  148.1000       8.7        67       987        94
VIS    2025250    183200   20.5800  148.0700       9.1        70       964        94
VIS    2025250    183200   20.5900  148.0400       9.7        69       963        94
VIS    2025250    183200   20.5700  148.0300      10.1        65       963        92
VIS    2025250    183200   20.5900  148.0100       9.2        70       948        95
VIS    2025250    183200   20.5800  147.8900       8.1        90       862        96
VIS    2025250    183200   20.5700  147.8800       8.4        92       860        96
VIS    2025250    183200   20.5700  147.8500       8.0        87       860        93
VIS    2025250    183200   20.5800  147.7900       7.3        98       749        96
VIS    2025250    183200   20.5800  147.6100      10.2       102       704        91
VIS    2025250    183200   20.5800  147.5900      10.8       102       717        94
VIS    2025250    183200   20.5700  147.5800      10.7       101       717        96
VIS    2025250    183200   20.5600  147.5500       8.5        84       747        93
VIS    2025250    183200   20.5600  147.5300       8.1        81       748        92
VIS    2025250    183200   20.5600  147.4400       9.8        90       754        93
VIS    2025250    183200   20.5800  147.4300       9.0        93       741        96
VIS    2025250    183200   20.5600  147.3000      10.6        94       729        92
VIS    2025250    183200   20.5600  147.2800      10.6        96       723        92
VIS    2025250    183200   20.5600  147.2300      11.6        90       737        94
VIS    2025250    183200   20.5700  147.1700      11.4        70       851        91
VIS    2025250    183200   20.5700  147.1400      11.7        73       885        99
VIS    2025250    183200   20.5700  147.1200      11.6        80       864        97
VIS    2025250    183200   20.5800  147.1000      11.5        85       844        99
VIS    2025250    183200   20.5600  147.0600      11.8        89       843        99
VIS    2025250    183200   20.5700  147.0600      12.0        89       843        99
VIS    2025250    183200   20.5500  147.0300      12.4        84       843        98
VIS    2025250    183200   20.5500  146.9900      11.5        87       798        96
VIS    2025250    183200   20.5600  146.9100      10.2        86       776        94
VIS    2025250    183200   20.5700  146.9000      10.0        87       765        92
VIS    2025250    183200   20.5700  146.7900      10.9        75       793        91
VIS    2025250    183200   20.5700  146.7700       9.9        78       805        91
VIS    2025250    183200   20.5500  146.7400       9.4        80       840        90
VIS    2025250    183200   20.5700  146.5400      13.1        72       953        96
VIS    2025250    183200   20.5600  146.5100      12.0        76       950        90
VIS    2025250    183200   20.5700  146.4800      11.5        82       853        92
VIS    2025250    183200   20.5500  146.4400      12.2        85       858        92
VIS    2025250    183200   20.5500  146.4100      12.3        78       918        92
VIS    2025250    183200   20.5500  146.4100      12.7        76       932        93
VIS    2025250    183200   20.5500  146.3700      12.9        77       923        98
VIS    2025250    183200   20.5500  146.3400      12.9        74       929        93
VIS    2025250    183200   20.5600  146.3200      14.0        70       928        91
VIS    2025250    183200   20.5600  146.2600      14.0        74       908        90
VIS    2025250    183200   20.5700  146.2200      12.5        81       903        90
VIS    2025250    183200   20.5700  146.2000      11.3        86       903        96
VIS    2025250    183200   20.5500  146.1700      12.1        79       827        94
VIS    2025250    183200   20.5500  146.1600      12.7        77       838        94
VIS    2025250    183200   20.5500  146.0800      11.5       100       799        93
VIS    2025250    183200   20.5400  146.0500      11.5        98       824        97
VIS    2025250    183200   20.5500  146.0400      12.2        98       827        98
VIS    2025250    183200   20.5600  146.0000      13.9        82       807        90
VIS    2025250    183200   20.5300  142.3900      11.1       130       886        90
VIS    2025250    183200   20.5200  142.3800      11.6       130       892        90
VIS    2025250    183200   20.5200  142.3600      10.7       129       894        93
VIS    2025250    183200   20.5800  151.0900       6.5        64       962        96
VIS    2025250    183200   20.5700  150.5200       7.4        79       973        90
VIS    2025250    183200   20.5600  149.5300       8.3        74       953        95
VIS    2025250    183200   20.5700  149.5300       8.2        75       953        96
VIS    2025250    183200   20.5800  149.5000       8.3        76       929        99
VIS    2025250    183200   20.5700  148.5800      10.0        67       945        99
VIS    2025250    183200   20.5500  148.5600       9.9        67       945        99
VIS    2025250    183200   20.5600  148.1100       8.7        67       987        94
VIS    2025250    183200   20.5400  148.0900       8.9        66       987        97
VIS    2025250    183200   20.5400  148.0700       9.0        65       963        97
VIS    2025250    183200   20.5500  148.0400      10.3        65       963        95
VIS    2025250    183200   20.5400  147.9200       8.8        84       862        92
VIS    2025250    183200   20.5600  147.8800       8.2        92       860        95
VIS    2025250    183200   20.5400  147.8600       7.8        87       859        90
VIS    2025250    183200   20.5400  147.8300       7.7        87       855        93
VIS    2025250    183200   20.5400  147.8200       7.7        87       844        93
VIS    2025250    183200   20.5500  147.7900       7.3        99       736        96
VIS    2025250    183200   20.5500  147.7700       7.9       103       702        95
VIS    2025250    183200   20.5400  147.6800       9.3       103       701        98
VIS    2025250    183200   20.5400  147.6000       9.9       101       709        97
VIS    2025250    183200   20.5600  147.6000      10.1       102       711        97
VIS    2025250    183200   20.5500  147.5600       8.5        91       721        95
VIS    2025250    183200   20.5400  147.5400       8.7        80       740        91
VIS    2025250    183200   20.5400  147.4400       9.7        88       741        93
VIS    2025250    183200   20.5300  147.4100       8.5        98       734        96
VIS    2025250    183200   20.5300  147.3400      10.2        85       746        94
VIS    2025250    183200   20.5400  147.3000      10.4        93       724        95
VIS    2025250    183200   20.5500  147.2800      10.6        97       721        94
VIS    2025250    183200   20.5500  147.2800      10.7        97       721        93
VIS    2025250    183200   20.5300  147.2300      11.9        84       737        91
VIS    2025250    183200   20.5400  147.2200      11.7        85       737        92
VIS    2025250    183200   20.5400  147.1500      10.4        76       822        93
VIS    2025250    183200   20.5500  147.1300      11.2        78       840        98
VIS    2025250    183200   20.5500  147.1300      11.3        79       856        99
VIS    2025250    183200   20.5300  147.1000      11.4        86       840        92
VIS    2025250    183200   20.5400  147.0400      12.7        81       843        94
VIS    2025250    183200   20.5400  147.0300      12.4        81       843        97
VIS    2025250    183200   20.5400  146.9900      11.4        88       822        98
VIS    2025250    183200   20.5300  146.9100      10.5        78       762        92
VIS    2025250    183200   20.5300  146.8900       9.8        80       753        91
VIS    2025250    183200   20.5300  146.7900      11.0        79       787        91
VIS    2025250    183200   20.5300  146.7600      10.8        85       805        96
VIS    2025250    183200   20.5400  146.5600      13.2        68       971        96
VIS    2025250    183200   20.5400  146.5500      13.4        68       971        97
VIS    2025250    183200   20.5400  146.5100      11.5        86       918        94
VIS    2025250    183200   20.5200  146.5000      11.1        95       872        96
VIS    2025250    183200   20.5300  146.4800      11.4        99       825        98
VIS    2025250    183200   20.5400  146.4200      11.9        80       910        91
VIS    2025250    183200   20.5200  146.3900      12.1        78       924        98
VIS    2025250    183200   20.5400  146.3700      12.1        84       923        96
VIS    2025250    183200   20.5200  146.3100      12.0        81       910        94
VIS    2025250    183200   20.5200  146.3000      12.1        81       910        96
VIS    2025250    183200   20.5300  146.2600      13.6        79       903        98
VIS    2025250    183200   20.5300  146.2500      13.4        80       901        99
VIS    2025250    183200   20.5400  146.2100      11.3        86       865        94
VIS    2025250    183200   20.5300  146.1900      11.0        88       824        97
VIS    2025250    183200   20.5400  146.1600      12.4        78       821        93
VIS    2025250    183200   20.5200  146.1100      12.7        79       807        90
VIS    2025250    183200   20.5400  146.0600      11.7        93       841        97
VIS    2025250    183200   20.5300  146.0300      12.4        88       822        97
VIS    2025250    183200   20.5100  142.3800      11.8       130       892        92
VIS    2025250    183200   20.5000  142.3600      11.3       129       904        91
VIS    2025250    183200   20.5700  151.1000       6.9        64       971        96
VIS    2025250    183200   20.5700  150.5300       7.4        79       973        90
VIS    2025250    183200   20.5400  149.6000       8.4        75       960        95
VIS    2025250    183200   20.5400  149.5600       8.4        74       965        90
VIS    2025250    183200   20.5500  149.5300       8.3        74       953        94
VIS    2025250    183200   20.5200  148.1300       9.1        82       997        91
VIS    2025250    183200   20.5400  148.0900       8.9        65       987        97
VIS    2025250    183200   20.5200  148.0800       8.8        63       964        93
VIS    2025250    183200   20.5300  148.0400       9.9        60       960        96
VIS    2025250    183200   20.5200  148.0100      10.6        56       961        93
VIS    2025250    183200   20.5200  148.0100      10.4        57       960        91
VIS    2025250    183200   20.5200  147.9600       9.2        80       868        91
VIS    2025250    183200   20.5300  147.9100       8.9        83       862        95
VIS    2025250    183200   20.5200  147.9000       9.0        79       862        97
VIS    2025250    183200   20.5200  147.8700       8.0        80       858        95
VIS    2025250    183200   20.5300  147.8200       7.8        85       844        94
VIS    2025250    183200   20.5300  147.8000       7.6        94       817        92
VIS    2025250    183200   20.5200  147.7700       7.8       104       708        96
VIS    2025250    183200   20.5100  147.6700       9.1       100       707        99
VIS    2025250    183200   20.5300  147.6500       8.6       103       702        98
VIS    2025250    183200   20.5200  147.6300       8.9       100       706        98
VIS    2025250    183200   20.5200  147.5900       9.6        99       710        95
VIS    2025250    183200   20.5300  147.5600       8.5        90       716        92
VIS    2025250    183200   20.5300  147.5500       8.6        85       721        91
VIS    2025250    183200   20.5100  147.4100       9.2        91       715        93
VIS    2025250    183200   20.5100  147.4000       9.8        94       716        94
VIS    2025250    183200   20.5200  147.3700       9.7        93       737        97
VIS    2025250    183200   20.5200  147.3500      10.0        88       744        96
VIS    2025250    183200   20.5100  147.3200      10.0        93       716        95
VIS    2025250    183200   20.5200  147.3100      10.3        94       715        95
VIS    2025250    183200   20.5200  147.2800      10.6        96       716        94
VIS    2025250    183200   20.5100  147.1700      10.6        76       818        94
VIS    2025250    183200   20.5300  147.1500      10.4        77       818        93
VIS    2025250    183200   20.5200  147.1100      11.2        79       839        94
VIS    2025250    183200   20.5000  147.0200      11.1        70       849        92
VIS    2025250    183200   20.5100  146.9900      11.0        82       831        97
VIS    2025250    183200   20.5100  146.9800      10.9        81       831        97
VIS    2025250    183200   20.5000  146.9600      10.7        78       821        96
VIS    2025250    183200   20.5100  146.8900      10.2        77       753        91
VIS    2025250    183200   20.5100  146.8800      10.3        81       753        92
VIS    2025250    183200   20.5000  146.8300      10.0        86       753        95
VIS    2025250    183200   20.5200  146.7900      10.8        80       782        92
VIS    2025250    183200   20.5000  146.7800      10.4        91       787        96
VIS    2025250    183200   20.5100  146.7500      10.8        89       858        96
VIS    2025250    183200   20.5200  146.7300      10.3        82       872        91
VIS    2025250    183200   20.5000  146.6900      12.7        66       964        99
VIS    2025250    183200   20.5000  146.6800      13.2        66       964        99
VIS    2025250    183200   20.5000  146.6500      14.7        65       965        95
VIS    2025250    183200   20.5000  146.6200      15.7        62       976        96
VIS    2025250    183200   20.5000  146.5400      12.2        75       930        95
VIS    2025250    183200   20.5000  146.5200      11.6        80       919        98
VIS    2025250    183200   20.5200  146.5000      11.2        94       915        94
VIS    2025250    183200   20.5200  146.4700      11.5        96       814        99
VIS    2025250    183200   20.5000  146.4400      14.1        70       903        93
VIS    2025250    183200   20.5100  146.4400      13.1        72       903        95
VIS    2025250    183200   20.5200  146.4000      12.5        75       924        97
VIS    2025250    183200   20.5000  146.3800      13.2        74       912       100
VIS    2025250    183200   20.5100  146.3400      11.9        82       921        96
VIS    2025250    183200   20.5200  146.3400      11.8        83       923        97
VIS    2025250    183200   20.5200  146.3100      12.1        80       910        96
VIS    2025250    183200   20.5100  146.2900      12.9        79       903        99
VIS    2025250    183200   20.5000  146.2600      13.3        77       903        96
VIS    2025250    183200   20.5100  146.2400      12.7        77       887        95
VIS    2025250    183200   20.5000  146.1900      12.0        92       814        97
VIS    2025250    183200   20.4900  146.1800      12.3        96       788        97
VIS    2025250    183200   20.5000  146.1600      12.0        93       809        97
VIS    2025250    183200   20.5000  146.0600      12.6        83       849        95
VIS    2025250    183200   20.5100  146.0200      13.2        82       795        91
VIS    2025250    183200   20.5100  146.0100      13.5        82       773        90
VIS    2025250    183200   20.4700  142.3500      11.5       122       909        93
VIS    2025250    183200   20.4800  142.3400      10.9       124       909        92
VIS    2025250    183200   20.5200  149.5500       8.6        76       945        94
VIS    2025250    183200   20.5200  149.5300       8.4        74       934        92
VIS    2025250    183200   20.5200  149.5200       8.4        75       934        91
VIS    2025250    183200   20.5100  148.5500      10.0        73       999        92
VIS    2025250    183200   20.5100  148.1400       9.3        84       992        90
VIS    2025250    183200   20.5100  148.1200       9.0        77       997        94
VIS    2025250    183200   20.5100  148.0900       9.2        60       977        92
VIS    2025250    183200   20.5000  148.0600       9.5        57       944        92
VIS    2025250    183200   20.4900  148.0400       9.7        55       944        92
VIS    2025250    183200   20.5000  148.0200      10.2        54       959        93
VIS    2025250    183200   20.5100  148.0000      10.0        62       954        90
VIS    2025250    183200   20.5000  147.9400       9.5        82       868        99
VIS    2025250    183200   20.5100  147.9100       9.5        82       868        99
VIS    2025250    183200   20.4900  147.9100       9.7        79       868        99
VIS    2025250    183200   20.4900  147.8700       8.2        81       854        95
VIS    2025250    183200   20.4900  147.7700       8.3       102       703        91
VIS    2025250    183200   20.4900  147.7500       8.3       102       703        96
VIS    2025250    183200   20.4900  147.7200       9.0       100       703        98
VIS    2025250    183200   20.5100  147.6700       9.0       100       710        99
VIS    2025250    183200   20.5100  147.6500       8.4       100       710        99
VIS    2025250    183200   20.5000  147.6300       8.5        99       710        97
VIS    2025250    183200   20.5100  147.6000       9.3        97       709        93
VIS    2025250    183200   20.4800  147.5600       9.3        96       714        95
VIS    2025250    183200   20.4900  147.5500       9.3        89       714        94
VIS    2025250    183200   20.4900  147.5200       9.8        82       722        92
VIS    2025250    183200   20.4800  147.5000      10.0        82       742        93
VIS    2025250    183200   20.4900  147.4600      11.0        86       798        95
VIS    2025250    183200   20.4900  147.4500      10.6        86       746        91
VIS    2025250    183200   20.4800  147.4200      10.1        89       716        93
VIS    2025250    183200   20.4900  147.4100       9.6        92       715        95
VIS    2025250    183200   20.4800  147.3600       9.9        93       715        96
VIS    2025250    183200   20.4900  147.3500       9.9        93       717        96
VIS    2025250    183200   20.5000  147.3200       9.8        93       713        95
VIS    2025250    183200   20.5000  147.3000       9.6        94       712        96
VIS    2025250    183200   20.5000  147.2700      10.9        93       718        94
VIS    2025250    183200   20.5000  147.2600      12.0        92       720        92
VIS    2025250    183200   20.5000  147.1700      10.7        75       818        94
VIS    2025250    183200   20.4800  147.1400      12.1        68       835        90
VIS    2025250    183200   20.4800  147.1100      12.5        63       839        90
VIS    2025250    183200   20.4800  147.0800      12.4        65       851        91
VIS    2025250    183200   20.5000  147.0200      11.0        69       849        93
VIS    2025250    183200   20.4800  146.9900      10.6        72       834        95
VIS    2025250    183200   20.4800  146.9700      10.3        75       827        95
VIS    2025250    183200   20.4800  146.9600      10.5        76       827        94
VIS    2025250    183200   20.4900  146.9300      10.9        75       798        92
VIS    2025250    183200   20.5000  146.9000      10.8        78       762        92
VIS    2025250    183200   20.4900  146.8800      10.8        84       753        92
VIS    2025250    183200   20.5000  146.8400      10.1        87       751        95
VIS    2025250    183200   20.4800  146.8100      10.6        89       752        95
VIS    2025250    183200   20.5000  146.7900      10.1        91       771        96
VIS    2025250    183200   20.5000  146.7800      10.3        92       782        97
VIS    2025250    183200   20.4800  146.7400      10.3        86       837        98
VIS    2025250    183200   20.4800  146.7200      11.8        74       857        91
VIS    2025250    183200   20.5000  146.6800      13.4        65       964        99
VIS    2025250    183200   20.4800  146.6500      14.7        66       963        94
VIS    2025250    183200   20.4900  146.6200      15.8        63       976        97
VIS    2025250    183200   20.4800  146.5900      13.4        68       977        91
VIS    2025250    183200   20.4900  146.5200      11.5        82       915        98
VIS    2025250    183200   20.4900  146.5100      11.4        85       898        98
VIS    2025250    183200   20.4800  146.4800      12.1        85       806        95
VIS    2025250    183200   20.4900  146.4400      14.5        69       918        90
VIS    2025250    183200   20.4800  146.4300      14.6        68       924        92
VIS    2025250    183200   20.4800  146.4000      14.2        70       919        97
VIS    2025250    183200   20.4800  146.3800      13.8        71       918        98
VIS    2025250    183200   20.4900  146.3400      12.3        80       923        96
VIS    2025250    183200   20.4800  146.3100      13.0        76       898        98
VIS    2025250    183200   20.4800  146.3100      13.3        75       898        98
VIS    2025250    183200   20.4800  146.2700      13.4        76       889        91
VIS    2025250    183200   20.4900  146.2100      12.7        87       814        97
VIS    2025250    183200   20.4800  146.1700      12.6        93       772        97
VIS    2025250    183200   20.4900  146.1600      12.4        93       779        97
VIS    2025250    183200   20.4700  146.1400      13.1        82       792        91
VIS    2025250    183200   20.4700  146.1000      13.5        87       838        98
VIS    2025250    183200   20.4700  146.0700      13.2        90       838        98
VIS    2025250    183200   20.4800  146.0600      12.8        86       838        98
VIS    2025250    183200   20.4800  146.0200      13.1        87       773        91
VIS    2025250    183200   20.4700  145.9900      14.1        88       751        93
VIS    2025250    183200   20.4400  142.3500      11.4       117       904        96
VIS    2025250    183200   20.5300  151.1400       8.0        56       974        91
VIS    2025250    183200   20.5100  149.5900       8.7        77       945        97
VIS    2025250    183200   20.5000  149.5400       8.9        77       937        92
VIS    2025250    183200   20.4700  148.4600       9.5        68       989        97
VIS    2025250    183200   20.4700  148.1400       8.7        77       974        92
VIS    2025250    183200   20.4700  148.1000       9.0        72       972        94
VIS    2025250    183200   20.4800  148.0900       9.3        63       972        94
VIS    2025250    183200   20.4700  148.0500       9.7        58       937        93
VIS    2025250    183200   20.4600  148.0200       9.0        71       933        93
VIS    2025250    183200   20.4800  148.0000       9.6        69       928        91
VIS    2025250    183200   20.4800  147.9900       9.4        75       899        90
VIS    2025250    183200   20.4700  147.9600       9.6        81       859        92
VIS    2025250    183200   20.4700  147.9400      10.2        76       859        94
VIS    2025250    183200   20.4800  147.9000       9.6        75       868        94
VIS    2025250    183200   20.4600  147.7200       9.3        98       703        95
VIS    2025250    183200   20.4700  147.6800       8.8       100       708        98
VIS    2025250    183200   20.4600  147.6500       8.7       101       708        98
VIS    2025250    183200   20.4700  147.6200       9.3       101       705        97
VIS    2025250    183200   20.4600  147.6100       9.7       102       705        96
VIS    2025250    183200   20.4700  147.5900       9.7       101       708        96
VIS    2025250    183200   20.4700  147.5500       9.8        92       713        94
VIS    2025250    183200   20.4700  147.5400       9.5        90       714        94
VIS    2025250    183200   20.4600  147.5100      10.7        84       742        93
VIS    2025250    183200   20.4600  147.4900      10.2        83       752        93
VIS    2025250    183200   20.4700  147.4600      11.0        90       801        96
VIS    2025250    183200   20.4800  147.4300      10.5        89       716        92
VIS    2025250    183200   20.4600  147.4200      10.6        89       711        93
VIS    2025250    183200   20.4600  147.3800       9.5        87       711        94
VIS    2025250    183200   20.4600  147.3500       9.1        85       711        93
VIS    2025250    183200   20.4800  147.3400       9.7        89       713        93
VIS    2025250    183200   20.4600  147.2900       8.5        87       717        91
VIS    2025250    183200   20.4600  147.2600       9.4        87       721        94
VIS    2025250    183200   20.4700  147.2300      10.7        88       733        93
VIS    2025250    183200   20.4600  147.2000      10.5        84       748        91
VIS    2025250    183200   20.4700  147.1800      10.4        77       812        93
VIS    2025250    183200   20.4600  147.1500      11.7        73       834        91
VIS    2025250    183200   20.4500  147.1400      12.8        71       839        90
VIS    2025250    183200   20.4500  147.0900      11.8        64       839        91
VIS    2025250    183200   20.4500  147.0700      11.1        75       839        96
VIS    2025250    183200   20.4700  147.0200      11.2        74       853        97
VIS    2025250    183200   20.4600  147.0000      10.4        74       843        96
VIS    2025250    183200   20.4600  146.9800      11.1        75       827        95
VIS    2025250    183200   20.4500  146.9600      11.6        73       827        91
VIS    2025250    183200   20.4600  146.9200      12.1        79       820        92
VIS    2025250    183200   20.4500  146.8800      10.8        84       751        93
VIS    2025250    183200   20.4600  146.8700      10.8        88       750        94
VIS    2025250    183200   20.4600  146.8300      11.4        92       750        95
VIS    2025250    183200   20.4700  146.8200      10.9        90       752        95
VIS    2025250    183200   20.4500  146.7800      10.5        88       768        95
VIS    2025250    183200   20.4600  146.7600      10.1        92       779        98
VIS    2025250    183200   20.4500  146.7200      11.4        86       817        92
VIS    2025250    183200   20.4500  146.5900      13.4        68       941        93
VIS    2025250    183200   20.4600  146.5500      11.7        71       905        91
VIS    2025250    183200   20.4600  146.5500      11.6        72       903        91
VIS    2025250    183200   20.4500  146.5100      10.8        85       843        97
VIS    2025250    183200   20.4500  146.5000      11.5        85       841        97
VIS    2025250    183200   20.4600  146.4700      12.9        80       840        94
VIS    2025250    183200   20.4500  146.4500      14.2        76       903        96
VIS    2025250    183200   20.4500  146.4100      14.7        73       926        92
VIS    2025250    183200   20.4600  146.3800      14.8        67       926        95
VIS    2025250    183200   20.4500  146.3700      15.2        66       926        95
VIS    2025250    183200   20.4700  146.3300      12.9        77       905       100
VIS    2025250    183200   20.4700  146.3100      13.3        76       903       100
VIS    2025250    183200   20.4500  146.2800      14.5        71       903        95
VIS    2025250    183200   20.4500  146.2600      13.7        75       898        92
VIS    2025250    183200   20.4500  146.2400      13.0        81       826        91
VIS    2025250    183200   20.4400  146.2100      14.0        79       814        91
VIS    2025250    183200   20.4400  146.1900      13.6        84       809        94
VIS    2025250    183200   20.4400  146.1600      12.5        89       792        96
VIS    2025250    183200   20.4400  146.1300      13.3        84       805        95
VIS    2025250    183200   20.4400  146.1200      13.4        85       805        95
VIS    2025250    183200   20.4500  146.0800      13.9        95       838        99
VIS    2025250    183200   20.4500  146.0700      14.0        94       838        98
VIS    2025250    183200   20.4400  146.0400      13.0        92       799        96
VIS    2025250    183200   20.4500  146.0100      13.1        92       773        96
VIS    2025250    183200   20.4200  142.3400      11.7       115       880        93
VIS    2025250    183200   20.4700  150.5100       7.3        79       950        92
VIS    2025250    183200   20.4700  150.5000       7.0        78       950        93
VIS    2025250    183200   20.4500  148.4900       9.7        70       978        96
VIS    2025250    183200   20.4700  148.4700       9.5        70       989        97
VIS    2025250    183200   20.4400  148.1400       8.0        77       976        93
VIS    2025250    183200   20.4400  148.1200       8.2        81       959        90
VIS    2025250    183200   20.4500  148.0900       8.9        72       967        94
VIS    2025250    183200   20.4600  148.0600       9.6        62       937        95
VIS    2025250    183200   20.4400  148.0300       8.8        75       930        94
VIS    2025250    183200   20.4600  148.0200       8.9        74       930        93
VIS    2025250    183200   20.4400  147.9800       9.0        82       857        95
VIS    2025250    183200   20.4500  147.9700       9.4        81       852        96
VIS    2025250    183200   20.4500  147.9300      10.9        70       866        91
VIS    2025250    183200   20.4400  147.7100       9.4        96       705        97
VIS    2025250    183200   20.4400  147.6800       8.7        95       713        97
VIS    2025250    183200   20.4400  147.6600       8.6        97       704        98
VIS    2025250    183200   20.4500  147.6500       8.8       101       704        99
VIS    2025250    183200   20.4500  147.6200       9.7       102       704        97
VIS    2025250    183200   20.4400  147.5900       9.7        99       708        97
VIS    2025250    183200   20.4500  147.5600       9.9        93       713        95
VIS    2025250    183200   20.4500  147.5300      10.7        85       715        91
VIS    2025250    183200   20.4500  147.5100      10.7        83       742        92
VIS    2025250    183200   20.4500  147.4900      10.2        81       750        92
VIS    2025250    183200   20.4400  147.4700      10.1        81       746        92
VIS    2025250    183200   20.4400  147.4300      10.5        92       711        94
VIS    2025250    183200   20.4400  147.4200      10.3        90       710        93
VIS    2025250    183200   20.4300  147.3900       9.7        87       707        93
VIS    2025250    183200   20.4400  147.3600       8.9        84       710        92
VIS    2025250    183200   20.4500  147.3500       8.8        82       711        91
VIS    2025250    183200   20.4400  147.3100       8.5        84       713        90
VIS    2025250    183200   20.4500  147.2900       8.8        86       720        91
VIS    2025250    183200   20.4500  147.2700       9.0        87       720        93
VIS    2025250    183200   20.4400  147.2300       9.7        88       733        94
VIS    2025250    183200   20.4300  147.2000      10.0        85       754        91
VIS    2025250    183200   20.4400  147.1900       9.8        84       789        92
VIS    2025250    183200   20.4500  147.1400      12.7        72       847        92
VIS    2025250    183200   20.4300  147.1000      11.7        77       842        98
VIS    2025250    183200   20.4500  147.0900      11.7        67       839        92
VIS    2025250    183200   20.4500  147.0700      10.9        75       839        97
VIS    2025250    183200   20.4300  147.0500      11.0        72       860        97
VIS    2025250    183200   20.4300  147.0100      10.6        75       862        96
VIS    2025250    183200   20.4500  146.9800      10.5        80       827        91
VIS    2025250    183200   20.4300  146.9100      11.1        80       810        91
VIS    2025250    183200   20.4300  146.8900      11.3        80       776        90
VIS    2025250    183200   20.4400  146.8300      11.8        93       761        91
VIS    2025250    183200   20.4400  146.8200      11.6        93       761        92
VIS    2025250    183200   20.4400  146.7900      10.5        89       768        95
VIS    2025250    183200   20.4500  146.7700      10.3        89       776        97
VIS    2025250    183200   20.4400  146.7300      11.6        87       813        95
VIS    2025250    183200   20.4400  146.7200      11.7        86       817        92
VIS    2025250    183200   20.4400  146.6000      13.4        68       943        95
VIS    2025250    183200   20.4400  146.5600      12.3        70       905        91
VIS    2025250    183200   20.4400  146.5500      11.7        73       903        93
VIS    2025250    183200   20.4400  146.5100      10.9        86       843        97
VIS    2025250    183200   20.4400  146.5000      11.1        88       841        94
VIS    2025250    183200   20.4200  146.4500      13.7        75       853        95
VIS    2025250    183200   20.4200  146.4500      13.9        75       880        97
VIS    2025250    183200   20.4400  146.4100      14.4        74       930        95
VIS    2025250    183200   20.4400  146.4000      14.4        72       930        97
VIS    2025250    183200   20.4400  146.3600      14.9        66       924        97
VIS    2025250    183200   20.4400  146.3500      14.2        69       923        98
VIS    2025250    183200   20.4300  146.3300      14.3        74       903        96
VIS    2025250    183200   20.4400  146.2800      14.8        70       903        96
VIS    2025250    183200   20.4400  146.2800      14.6        71       903        96
VIS    2025250    183200   20.4400  146.2400      13.3        81       817        91
VIS    2025250    183200   20.4400  146.2100      13.8        78       814        91
VIS    2025250    183200   20.4400  146.2000      13.6        80       814        93
VIS    2025250    183200   20.4200  146.1700      12.9        83       801        93
VIS    2025250    183200   20.4200  146.1300      12.5        89       805        96
VIS    2025250    183200   20.4400  146.1300      13.1        85       805        95
VIS    2025250    183200   20.4400  146.1000      13.7        92       833        98
VIS    2025250    183200   20.4400  146.0800      13.9        95       834        98
VIS    2025250    183200   20.4200  146.0400      12.7        92       795        96
VIS    2025250    183200   20.4600  150.5100       7.2        80       938        92
VIS    2025250    183200   20.4400  148.5100       9.8        69       978        95
VIS    2025250    183200   20.4400  148.4800       9.5        68       978        96
VIS    2025250    183200   20.4200  148.4800       9.3        65       978        96
VIS    2025250    183200   20.4200  148.1500       8.4        82       979        92
VIS    2025250    183200   20.4400  148.1400       8.2        79       959        93
VIS    2025250    183200   20.4400  148.1100       8.4        83       952        92
VIS    2025250    183200   20.4300  148.0800       8.4        80       964        94
VIS    2025250    183200   20.4400  148.0700       8.7        71       964        97
VIS    2025250    183200   20.4300  148.0400       8.5        77       928        94
VIS    2025250    183200   20.4300  148.0300       8.6        81       928        93
VIS    2025250    183200   20.4200  147.9900       8.9        84       857        96
VIS    2025250    183200   20.4200  147.9700       9.1        79       854        96
VIS    2025250    183200   20.4300  147.9400      10.4        73       852        90
VIS    2025250    183200   20.4200  147.9200       9.7        75       864        94
VIS    2025250    183200   20.4300  147.8800       9.2        71       860        91
VIS    2025250    183200   20.4300  147.8700       8.9        73       860        92
VIS    2025250    183200   20.4200  147.7100       9.8        97       702        96
VIS    2025250    183200   20.4100  147.6800       8.9        94       705        96
VIS    2025250    183200   20.4300  147.6700       8.4        96       708        97
VIS    2025250    183200   20.4300  147.6500       8.6        94       703        97
VIS    2025250    183200   20.4100  147.6000       9.6        96       712        95
VIS    2025250    183200   20.4100  147.5800       9.3        94       713        95
VIS    2025250    183200   20.4200  147.5700       9.3        92       713        95
VIS    2025250    183200   20.4200  147.5400      10.3        86       726        93
VIS    2025250    183200   20.4300  147.4300      10.2        91       710        94
VIS    2025250    183200   20.4100  147.4100      10.1        91       708        93
VIS    2025250    183200   20.4100  147.3900      10.3        87       707        91
VIS    2025250    183200   20.4100  147.3600       9.9        84       709        91
VIS    2025250    183200   20.4100  147.3400       9.4        83       712        92
VIS    2025250    183200   20.4100  147.3200       8.9        83       712        92
VIS    2025250    183200   20.4100  147.3000       8.7        78       719        91
VIS    2025250    183200   20.4100  147.2700       9.7        81       722        91
VIS    2025250    183200   20.4200  147.2400      10.4        86       737        93
VIS    2025250    183200   20.4100  147.2100      10.1        86       754        91
VIS    2025250    183200   20.4200  147.1800       9.7        86       770        91
VIS    2025250    183200   20.4100  147.1700      10.0        86       790        95
VIS    2025250    183200   20.4000  147.1400      10.5        82       809        97
VIS    2025250    183200   20.4000  147.1200      11.1        82       830        98
VIS    2025250    183200   20.4200  147.1000      10.9        81       842        99
VIS    2025250    183200   20.4100  147.0500      10.4        71       864        96
VIS    2025250    183200   20.4200  147.0400      11.0        68       885        97
VIS    2025250    183200   20.4200  147.0100      10.7        74       866        95
VIS    2025250    183200   20.4200  146.9800      12.2        75       847        90
VIS    2025250    183200   20.4000  146.9100      10.1        88       801        91
VIS    2025250    183200   20.4000  146.8900      10.8        88       782        90
VIS    2025250    183200   20.4100  146.8200      11.4        88       801        93
VIS    2025250    183200   20.4200  146.7800       9.9        85       789        90
VIS    2025250    183200   20.4200  146.7400      10.9        81       811        91
VIS    2025250    183200   20.4100  146.7300      11.4        74       839        93
VIS    2025250    183200   20.4100  146.6700      12.1        78       849        91
VIS    2025250    183200   20.4000  146.6300      11.1        79       902        97
VIS    2025250    183200   20.4000  146.5800      11.7        77       853        95
VIS    2025250    183200   20.4000  146.5600      11.4        79       837        95
VIS    2025250    183200   20.4000  146.5300      11.4        81       819        93
VIS    2025250    183200   20.4200  146.5200      10.9        83       843        94
VIS    2025250    183200   20.4000  146.4800      11.2        89       820        91
VIS    2025250    183200   20.4100  146.4500      13.1        77       853        96
VIS    2025250    183200   20.4000  146.4200      11.9        87       923        91
VIS    2025250    183200   20.4000  146.4000      12.2        87       924        96
VIS    2025250    183200   20.4000  146.3700      13.4        80       902        95
VIS    2025250    183200   20.4200  146.3500      13.7        76       903        99
VIS    2025250    183200   20.4200  146.3100      15.1        75       905        99
VIS    2025250    183200   20.4100  146.3000      15.5        71       908        97
VIS    2025250    183200   20.4200  146.2700      15.0        70       908        95
VIS    2025250    183200   20.4000  146.2500      13.7        77       865        92
VIS    2025250    183200   20.4100  146.2200      14.0        82       816        93
VIS    2025250    183200   20.4000  146.1900      14.9        74       849        90
VIS    2025250    183200   20.4100  146.1400      12.3        91       805        94
VIS    2025250    183200   20.3900  146.1200      12.9        93       817        97
VIS    2025250    183200   20.4100  146.1000      13.0        96       827        99
VIS    2025250    183200   20.3900  146.0700      12.4        88       800        95
VIS    2025250    183200   20.4000  146.0600      12.6        89       800        93
VIS    2025250    183200   20.4100  146.0300      12.0        94       771        95
VIS    2025250    183200   20.4200  150.5100       7.3        79       956        90
VIS    2025250    183200   20.4300  150.4900       6.9        81       938        91
VIS    2025250    183200   20.4400  150.4800       6.9        80       938        91
VIS    2025250    183200   20.4200  148.4900       9.4        65       978        95
VIS    2025250    183200   20.4000  148.4700       9.2        64       978        96
VIS    2025250    183200   20.4000  148.4500       9.2        62       977        96
VIS    2025250    183200   20.4000  148.1200       8.7        87       940        92
VIS    2025250    183200   20.4000  148.1100       8.8        86       940        95
VIS    2025250    183200   20.4000  148.0800       8.6        80       948        96
VIS    2025250    183200   20.4100  148.0400       8.5        73       925        96
VIS    2025250    183200   20.4000  148.0300       8.6        74       925        96
VIS    2025250    183200   20.3900  147.9900       9.2        83       860        99
VIS    2025250    183200   20.3900  147.9800       9.3        81       857        99
VIS    2025250    183200   20.3900  147.9500       9.3        73       854        96
VIS    2025250    183200   20.3900  147.9300       8.9        72       862        95
VIS    2025250    183200   20.4100  147.8900       8.7        78       860        97
VIS    2025250    183200   20.3900  147.7300       9.7        99       703        97
VIS    2025250    183200   20.4000  147.7000       9.3        97       705        96
VIS    2025250    183200   20.3900  147.6800       8.7        97       705        96
VIS    2025250    183200   20.3900  147.6400       9.1        91       705        94
VIS    2025250    183200   20.4000  147.6300       9.2        91       705        95
VIS    2025250    183200   20.3900  147.6000       9.6        92       724        94
VIS    2025250    183200   20.3900  147.5700       9.3        90       737        95
VIS    2025250    183200   20.3800  147.5400       9.3        91       737        95
VIS    2025250    183200   20.3800  147.5300       9.7        90       731        95
VIS    2025250    183200   20.3800  147.5100      10.4        87       730        92
VIS    2025250    183200   20.3900  147.4800      10.5        79       725        90
VIS    2025250    183200   20.3800  147.4400       9.9        91       718        95
VIS    2025250    183200   20.4000  147.4200      10.0        92       708        95
VIS    2025250    183200   20.3800  147.4100      10.0        92       708        94
VIS    2025250    183200   20.4000  147.3800      10.5        87       707        92
VIS    2025250    183200   20.4000  147.3400       9.7        84       712        92
VIS    2025250    183200   20.4000  147.3300       9.4        84       712        92
VIS    2025250    183200   20.3800  147.2900       8.9        80       719        91
VIS    2025250    183200   20.3900  147.2800       8.9        82       721        92
VIS    2025250    183200   20.4000  147.2400      10.8        84       741        92
VIS    2025250    183200   20.4000  147.2200      10.6        84       742        92
VIS    2025250    183200   20.3800  147.2100      10.5        85       753        94
VIS    2025250    183200   20.4000  147.1700      10.1        89       756        93
VIS    2025250    183200   20.3800  147.1400      11.0        81       778        91
VIS    2025250    183200   20.3800  147.1300      11.0        80       806        94
VIS    2025250    183200   20.3800  147.1000      10.0        77       830        97
VIS    2025250    183200   20.3900  147.0700      10.4        75       862        97
VIS    2025250    183200   20.3800  147.0400       9.7        76       901        91
VIS    2025250    183200   20.3900  147.0100       9.6        72       881        93
VIS    2025250    183200   20.3800  147.0000       9.6        74       854        90
VIS    2025250    183200   20.3900  146.8700      11.4        89       782        90
VIS    2025250    183200   20.3800  146.8100      11.2        91       797        97
VIS    2025250    183200   20.3800  146.8100      11.1        90       797        98
VIS    2025250    183200   20.3900  146.7200      11.5        72       839        92
VIS    2025250    183200   20.3800  146.7100      11.4        75       826        93
VIS    2025250    183200   20.3800  146.6400      12.1        79       831        95
VIS    2025250    183200   20.3800  146.6300      12.5        77       831        94
VIS    2025250    183200   20.3700  146.6100      12.7        75       902        95
VIS    2025250    183200   20.3800  146.5700      11.9        83       827        97
VIS    2025250    183200   20.3700  146.5500      11.9        83       813        96
VIS    2025250    183200   20.3800  146.5300      11.7        81       803        94
VIS    2025250    183200   20.3900  146.5000      11.4        82       819        93
VIS    2025250    183200   20.3900  146.4200      11.4        88       916        91
VIS    2025250    183200   20.3900  146.3800      12.7        84       896        94
VIS    2025250    183200   20.3700  146.3400      13.8        87       893        93
VIS    2025250    183200   20.3900  146.3200      14.6        81       912        99
VIS    2025250    183200   20.3800  146.3100      14.2        80       915        99
VIS    2025250    183200   20.3700  146.2800      14.2        70       908        93
VIS    2025250    183200   20.3900  146.1900      15.2        74       860        90
VIS    2025250    183200   20.3800  146.1200      13.3        93       817        97
VIS    2025250    183200   20.3900  146.1100      12.9        94       817        97
VIS    2025250    183200   20.3700  146.0700      12.8        87       775        95
VIS    2025250    183200   20.4100  150.5500       7.8        76       968        90
VIS    2025250    183200   20.4000  150.5300       7.6        75       961        92
VIS    2025250    183200   20.3900  148.4800       9.4        64       978        96
VIS    2025250    183200   20.3800  148.4700       9.4        64       978        95
VIS    2025250    183200   20.3800  148.1500       8.9        87       976        90
VIS    2025250    183200   20.3900  148.1100       8.8        85       940        95
VIS    2025250    183200   20.3700  148.0700       9.0        69       941        99
VIS    2025250    183200   20.3800  148.0600       8.7        70       941        98
VIS    2025250    183200   20.3700  148.0500       8.7        71       938        97
VIS    2025250    183200   20.3800  148.0200       8.7        78       887        98
VIS    2025250    183200   20.3600  147.9700       9.7        82       862        99
VIS    2025250    183200   20.3700  147.9700       9.7        82       862        99
VIS    2025250    183200   20.3700  147.9300       9.2        73       862        96
VIS    2025250    183200   20.3600  147.9200       9.2        73       874        96
VIS    2025250    183200   20.3800  147.7300       9.5        98       703        97
VIS    2025250    183200   20.3800  147.7200       9.2        97       705        98
VIS    2025250    183200   20.3600  147.6900       8.7        98       709        99
VIS    2025250    183200   20.3700  147.6600       8.6        97       707        97
VIS    2025250    183200   20.3700  147.6400       9.1        92       707        93
VIS    2025250    183200   20.3600  147.6200       9.2        90       715        92
VIS    2025250    183200   20.3600  147.5800       9.5        91       737        95
VIS    2025250    183200   20.3600  147.5600       9.3        91       739        94
VIS    2025250    183200   20.3700  147.5500       9.0        92       740        92
VIS    2025250    183200   20.3600  147.5000       9.8        88       725        90
VIS    2025250    183200   20.3600  147.4600       9.4        89       718        92
VIS    2025250    183200   20.3700  147.4400       9.8        90       718        95
VIS    2025250    183200   20.3600  147.4200       9.7        90       718        95
VIS    2025250    183200   20.3600  147.3900      10.0        91       711        95
VIS    2025250    183200   20.3700  147.3600      10.1        92       715        93
VIS    2025250    183200   20.3800  147.3000       9.0        79       719        91
VIS    2025250    183200   20.3600  147.2600      10.0        91       725        93
VIS    2025250    183200   20.3600  147.2300      10.0        85       735        91
VIS    2025250    183200   20.3700  147.2200      10.3        82       741        91
VIS    2025250    183200   20.3500  147.1800      10.6        86       748        93
VIS    2025250    183200   20.3600  147.1700      10.9        87       750        93
VIS    2025250    183200   20.3500  147.1100      10.9        80       809        96
VIS    2025250    183200   20.3700  147.0800       9.9        73       846        95
VIS    2025250    183200   20.3600  147.0500       9.9        78       889        97
VIS    2025250    183200   20.3500  147.0400       9.7        79       883        97
VIS    2025250    183200   20.3700  147.0100       9.1        74       856        93
VIS    2025250    183200   20.3700  147.0000      10.0        72       847        91
VIS    2025250    183200   20.3500  146.9600      10.8        79       781        91
VIS    2025250    183200   20.3600  146.8800      10.6        90       764        97
VIS    2025250    183200   20.3500  146.8600      11.4        90       776        97
VIS    2025250    183200   20.3700  146.8300      11.6        89       797        96
VIS    2025250    183200   20.3500  146.8100      11.5        93       810        96
VIS    2025250    183200   20.3700  146.7900      11.3        88       795        98
VIS    2025250    183200   20.3500  146.7200      11.6        78       848        96
VIS    2025250    183200   20.3500  146.6800      11.4        86       805        95
VIS    2025250    183200   20.3500  146.6700      11.7        83       806        95
VIS    2025250    183200   20.3500  146.6100      12.9        74       902        91
VIS    2025250    183200   20.3500  146.5800      11.9        87       867        99
VIS    2025250    183200   20.3500  146.5500      12.0        88       827        99
VIS    2025250    183200   20.3500  146.5300      11.9        84       805        95
VIS    2025250    183200   20.3500  146.5100      11.9        82       803        95
VIS    2025250    183200   20.3500  146.4900      11.7        85       811        96
VIS    2025250    183200   20.3500  146.4700      11.8        90       830        99
VIS    2025250    183200   20.3600  146.4400      10.4        99       856        91
VIS    2025250    183200   20.3500  146.3500      13.7        86       907        92
VIS    2025250    183200   20.3700  146.3100      14.1        81       927        99
VIS    2025250    183200   20.3500  146.2800      15.2        68       882        94
VIS    2025250    183200   20.3700  146.2800      14.2        69       893        92
VIS    2025250    183200   20.3600  146.2500      14.7        72       891        92
VIS    2025250    183200   20.3600  146.2100      14.7        83       870        98
VIS    2025250    183200   20.3600  146.1900      15.7        77       863        92
VIS    2025250    183200   20.3900  150.5400       7.5        77       969        91
VIS    2025250    183200   20.3700  150.5100       7.3        82       969        90
VIS    2025250    183200   20.3700  148.4900       9.4        63       993        90
VIS    2025250    183200   20.3600  148.4600       9.2        64       968        94
VIS    2025250    183200   20.3600  148.4500       9.1        64       968        94
VIS    2025250    183200   20.3400  148.2000       9.7        53       996        97
VIS    2025250    183200   20.3500  148.1800       9.8        53       996        96
VIS    2025250    183200   20.3500  148.1300       8.3        87       954        93
VIS    2025250    183200   20.3600  148.0900       8.9        77       945        97
VIS    2025250    183200   20.3500  148.0700       9.1        71       941        99
VIS    2025250    183200   20.3600  148.0500       8.8        70       938        97
VIS    2025250    183200   20.3600  148.0100       9.1        82       894        99
VIS    2025250    183200   20.3500  147.9800       9.8        79       866        98
VIS    2025250    183200   20.3400  147.9700      10.0        77       864        96
VIS    2025250    183200   20.3400  147.9300       9.7        79       866        96
VIS    2025250    183200   20.3500  147.9300       9.7        77       867        94
VIS    2025250    183200   20.3400  147.9000       8.3        84       867        95
VIS    2025250    183200   20.3500  147.7400       9.0        98       703        98
VIS    2025250    183200   20.3400  147.7100       9.1        96       709        98
VIS    2025250    183200   20.3500  147.6900       8.8        97       710        98
VIS    2025250    183200   20.3400  147.6600       8.3        97       714        98
VIS    2025250    183200   20.3400  147.6500       8.3        97       714        98
VIS    2025250    183200   20.3400  147.6100       9.3        90       728        95
VIS    2025250    183200   20.3500  147.6000       9.4        90       728        95
VIS    2025250    183200   20.3500  147.5700       9.5        91       739        96
VIS    2025250    183200   20.3500  147.5500       9.5        91       739        93
VIS    2025250    183200   20.3300  147.5200      10.4        85       737        93
VIS    2025250    183200   20.3500  147.4900       9.7        89       722        92
VIS    2025250    183200   20.3500  147.4600       9.4        90       718        93
VIS    2025250    183200   20.3500  147.4500       9.3        90       718        94
VIS    2025250    183200   20.3500  147.4100       9.3        89       720        96
VIS    2025250    183200   20.3500  147.4000       9.2        90       718        96
VIS    2025250    183200   20.3400  147.3800       9.4        92       718        95
VIS    2025250    183200   20.3400  147.2600       9.5        83       726        92
VIS    2025250    183200   20.3300  147.2500       9.7        81       728        91
VIS    2025250    183200   20.3300  147.1800       9.9        82       747        91
VIS    2025250    183200   20.3400  147.1700      10.1        84       748        93
VIS    2025250    183200   20.3400  147.1500      10.9        87       758        91
VIS    2025250    183200   20.3400  147.1100      11.5        81       778        93
VIS    2025250    183200   20.3300  147.1000      11.9        77       814        93
VIS    2025250    183200   20.3500  147.0800      10.6        77       881        99
VIS    2025250    183200   20.3500  147.0400       9.8        78       883        98
VIS    2025250    183200   20.3300  147.0200      10.0        70       862        96
VIS    2025250    183200   20.3400  147.0000      10.0        71       847        94
VIS    2025250    183200   20.3300  146.9600      10.4        83       781        95
VIS    2025250    183200   20.3300  146.9500      10.1        85       778        94
VIS    2025250    183200   20.3300  146.8800      10.4        88       752        92
VIS    2025250    183200   20.3300  146.8600      11.2        85       776        90
VIS    2025250    183200   20.3400  146.8600      11.2        88       785        91
VIS    2025250    183200   20.3500  146.8200      11.2        95       810        96
VIS    2025250    183200   20.3400  146.7900      11.8        90       817        94
VIS    2025250    183200   20.3300  146.7800      11.6        90       817        92
VIS    2025250    183200   20.3400  146.7300      11.7        82       844        94
VIS    2025250    183200   20.3300  146.6900      10.8        88       804        94
VIS    2025250    183200   20.3400  146.6700      11.6        83       806        95
VIS    2025250    183200   20.3200  146.5900      12.3        84       867        92
VIS    2025250    183200   20.3400  146.5800      11.8        87       867        99
VIS    2025250    183200   20.3400  146.5500      11.5        90       827        98
VIS    2025250    183200   20.3400  146.5200      11.5        84       771        93
VIS    2025250    183200   20.3300  146.4900      11.5        89       771        96
VIS    2025250    183200   20.3400  146.4800      11.6        90       811        98
VIS    2025250    183200   20.3300  146.4500      12.4        93       834       100
VIS    2025250    183200   20.3200  146.4100      11.9        98       872        95
VIS    2025250    183200   20.3300  146.4100      11.6        98       872        92
VIS    2025250    183200   20.3400  146.3800      12.6        88       882        91
VIS    2025250    183200   20.3400  146.3600      13.5        86       907        94
VIS    2025250    183200   20.3300  146.3200      13.0        86       956        93
VIS    2025250    183200   20.3200  146.2900      14.4        72       887        97
VIS    2025250    183200   20.3300  146.2600      16.1        67       882        90
VIS    2025250    183200   20.3200  146.2600      16.3        69       893        93
VIS    2025250    183200   20.3200  146.2300      16.0        81       922        96
VIS    2025250    183200   20.3300  146.1900      15.0        87       896        91
VIS    2025250    183200   20.3200  146.1800      14.1        83       864        90
VIS    2025250    183200   20.3400  146.0400      13.6        80       763        90
VIS    2025250    183200   20.3500  150.5200       7.4        85       925        91
VIS    2025250    183200   20.3300  148.4600       9.0        61       983        92
VIS    2025250    183200   20.3400  148.2000       9.7        54       996        97
VIS    2025250    183200   20.3200  148.1800       9.6        54       983        97
VIS    2025250    183200   20.3300  148.1200       8.8        88       954        93
VIS    2025250    183200   20.3300  148.0900       9.5        80       953        97
VIS    2025250    183200   20.3300  148.0600       9.5        74       938        99
VIS    2025250    183200   20.3300  148.0500       9.2        77       938        98
VIS    2025250    183200   20.3200  148.0100       9.4        84       900        99
VIS    2025250    183200   20.3100  147.9900       9.5        77       877        99
VIS    2025250    183200   20.3300  147.9700       9.7        77       866        98
VIS    2025250    183200   20.3200  147.9400       8.9        87       862        98
VIS    2025250    183200   20.3300  147.9200       8.6        88       864        98
VIS    2025250    183200   20.3300  147.9000       7.9        89       837        96
VIS    2025250    183200   20.3300  147.8700       7.1        92       729        93
VIS    2025250    183200   20.3200  147.7400       8.9        94       704        97
VIS    2025250    183200   20.3100  147.7300       9.2        94       704        97
VIS    2025250    183200   20.3300  147.7000       9.0        95       714        98
VIS    2025250    183200   20.3200  147.6600       8.5        94       716        96
VIS    2025250    183200   20.3100  147.6400       8.7        93       723        97
VIS    2025250    183200   20.3200  147.6300       8.8        92       724        97
VIS    2025250    183200   20.3200  147.6000       9.3        91       728        96
VIS    2025250    183200   20.3100  147.5800       9.4        91       724        94
VIS    2025250    183200   20.3200  147.5600       9.7        91       720        95
VIS    2025250    183200   20.3100  147.5100      11.4        82       725        90
VIS    2025250    183200   20.3200  147.5000      10.9        85       723        91
VIS    2025250    183200   20.3100  147.4600      10.4        92       717        95
VIS    2025250    183200   20.3100  147.4400       9.5        92       720        96
VIS    2025250    183200   20.3200  147.4300       9.3        92       720        96
VIS    2025250    183200   20.3300  147.4100       8.8        89       720        94
VIS    2025250    183200   20.3200  147.3800       8.6        88       721        93
VIS    2025250    183200   20.3200  147.1600      10.1        86       750        94
VIS    2025250    183200   20.3200  147.1600      10.4        86       753        94
VIS    2025250    183200   20.3200  147.1000      12.0        75       811        92
VIS    2025250    183200   20.3100  147.0700      11.2        71       889        99
VIS    2025250    183200   20.3100  147.0500      10.5        73       889        98
VIS    2025250    183200   20.3200  147.0200      10.1        69       879        96
VIS    2025250    183200   20.3100  147.0100      10.8        68       818        90
VIS    2025250    183200   20.3000  146.9600      10.3        88       782        96
VIS    2025250    183200   20.3000  146.9600      10.2        91       782        96
VIS    2025250    183200   20.3100  146.9300      10.1        87       743        92
VIS    2025250    183200   20.3200  146.8300      10.9        88       839        94
VIS    2025250    183200   20.3200  146.7900      11.2        94       839        90
VIS    2025250    183200   20.3200  146.7800      11.0        92       830        92
VIS    2025250    183200   20.3200  146.7500      10.6        92       844        97
VIS    2025250    183200   20.3000  146.7200      10.9        85       815        96
VIS    2025250    183200   20.3100  146.7000      11.1        87       806        94
VIS    2025250    183200   20.3100  146.6600      11.3        82       849        98
VIS    2025250    183200   20.3000  146.6500      11.5        82       863        99
VIS    2025250    183200   20.3000  146.6300      12.4        84       863        99
VIS    2025250    183200   20.3200  146.6100      12.9        81       867        90
VIS    2025250    183200   20.3200  146.5700      11.2        87       830        93
VIS    2025250    183200   20.3000  146.5100      10.5        94       749        96
VIS    2025250    183200   20.3000  146.5100      10.7        95       749        97
VIS    2025250    183200   20.3100  146.4900      11.8        93       767        98
VIS    2025250    183200   20.3100  146.4500      13.1        91       834        99
VIS    2025250    183200   20.3200  146.4300      12.0        99       843        97
VIS    2025250    183200   20.3200  146.4000      12.0        97       880        94
VIS    2025250    183200   20.3000  146.3200      11.8        86       926        95
VIS    2025250    183200   20.3100  146.3100      12.5        84       926        95
VIS    2025250    183200   20.3100  146.2900      14.1        74       887        98
VIS    2025250    183200   20.3100  146.2400      16.0        76       913        98
VIS    2025250    183200   20.3000  146.2400      16.1        78       917        95
VIS    2025250    183200   20.3100  146.2100      15.2        86       917        97
VIS    2025250    183200   20.3000  146.0700      12.9        82       748        91
VIS    2025250    183200   20.3400  150.5100       7.1        82       925        92
VIS    2025250    183200   20.3000  148.2500       9.6        65       988        94
VIS    2025250    183200   20.2900  148.2300       9.5        64       975        97
VIS    2025250    183200   20.3000  148.2000       9.8        59       975        96
VIS    2025250    183200   20.3000  148.1800       9.9        56       975        98
VIS    2025250    183200   20.3100  148.1700       9.7        55       983        97
VIS    2025250    183200   20.3100  148.1400       8.8        84       986        91
VIS    2025250    183200   20.3100  148.1200       9.4        90       983        91
VIS    2025250    183200   20.3000  148.0900      10.0        86       945        91
VIS    2025250    183200   20.2900  148.0700       9.6        81       934        95
VIS    2025250    183200   20.3000  148.0300       9.2        88       896        98
VIS    2025250    183200   20.3000  148.0100       9.3        86       893        98
VIS    2025250    183200   20.3100  147.9800       9.3        78       871        98
VIS    2025250    183200   20.2900  147.9600       8.2        88       865        98
VIS    2025250    183200   20.3000  147.9500       8.0        91       858        97
VIS    2025250    183200   20.3100  147.9200       8.0        94       858        95
VIS    2025250    183200   20.3100  147.7300       9.3        95       704        97
VIS    2025250    183200   20.3000  147.7100       9.2        95       721        98
VIS    2025250    183200   20.2900  147.6900       8.7        94       728        96
VIS    2025250    183200   20.3000  147.6500       8.8        92       726        96
VIS    2025250    183200   20.2900  147.6500       8.8        92       733        96
VIS    2025250    183200   20.2900  147.6100       9.2        92       724        96
VIS    2025250    183200   20.3000  147.6000       9.5        92       724        95
VIS    2025250    183200   20.2800  147.5700       9.5        88       717        93
VIS    2025250    183200   20.2900  147.5400       9.5        89       718        95
VIS    2025250    183200   20.2900  147.5200      10.1        84       725        92
VIS    2025250    183200   20.2800  147.4900      10.8        80       723        90
VIS    2025250    183200   20.3000  147.4500      10.9        90       717        93
VIS    2025250    183200   20.2900  147.4400      10.7        88       717        92
VIS    2025250    183200   20.3000  147.4200       9.4        89       718        95
VIS    2025250    183200   20.2900  147.4000       8.3        88       721        93
VIS    2025250    183200   20.2800  147.2400      11.1        83       732        91
VIS    2025250    183200   20.2900  147.2200      10.4        80       735        91
VIS    2025250    183200   20.2800  147.1800      10.0        86       734        94
VIS    2025250    183200   20.2800  147.1600      10.2        87       740        95
VIS    2025250    183200   20.2800  147.1300      11.3        86       755        92
VIS    2025250    183200   20.2900  147.0800      12.5        64       854        93
VIS    2025250    183200   20.2800  147.0700      12.6        64       862        93
VIS    2025250    183200   20.2900  147.0300      12.4        60       881        93
VIS    2025250    183200   20.2800  147.0200      12.8        61       885        91
VIS    2025250    183200   20.2900  146.9800      11.2        80       818        90
VIS    2025250    183200   20.3000  146.9300      10.1        88       742        92
VIS    2025250    183200   20.2800  146.8900       9.7        90       787        93
VIS    2025250    183200   20.3000  146.8700      10.5        87       811        90
VIS    2025250    183200   20.2900  146.8300      11.1        91       897        93
VIS    2025250    183200   20.2900  146.8100      10.5        93       850        94
VIS    2025250    183200   20.2900  146.7800      10.4        87       840        95
VIS    2025250    183200   20.2700  146.7600      10.8        81       850        97
VIS    2025250    183200   20.2700  146.7400      10.7        81       827        92
VIS    2025250    183200   20.2900  146.7300      10.8        85       821        97
VIS    2025250    183200   20.2700  146.6900      13.0        75       893        99
VIS    2025250    183200   20.2800  146.6600      11.5        85       884        99
VIS    2025250    183200   20.2900  146.6400      11.9        88       869        98
VIS    2025250    183200   20.2900  146.6200      12.7        88       863        99
VIS    2025250    183200   20.2900  146.6000      13.1        87       833        96
VIS    2025250    183200   20.2700  146.5700      11.8        85       752        93
VIS    2025250    183200   20.2700  146.5500      11.3        84       748        93
VIS    2025250    183200   20.2800  146.5100      11.5        96       752        98
VIS    2025250    183200   20.2900  146.5000      11.6        99       752        99
VIS    2025250    183200   20.2700  146.4600      12.7        93       863        97
VIS    2025250    183200   20.2900  146.4500      13.5        91       834        99
VIS    2025250    183200   20.2700  146.4200      13.2        83       948        93
VIS    2025250    183200   20.2800  146.3900      13.0        79       956        93
VIS    2025250    183200   20.2900  146.3200      11.8        84       926        95
VIS    2025250    183200   20.2800  146.2900      14.2        72       873        95
VIS    2025250    183200   20.2700  146.2600      15.2        70       895        96
VIS    2025250    183200   20.2800  146.2400      15.7        73       908        96
VIS    2025250    183200   20.2700  146.2100      15.3        74       899        98
VIS    2025250    183200   20.2700  146.2000      15.0        71       889        96
VIS    2025250    183200   20.2700  148.2600       9.4        67       954        94
VIS    2025250    183200   20.2700  148.2400       9.2        65       954        94
VIS    2025250    183200   20.2800  148.2000       9.8        58       975        98
VIS    2025250    183200   20.2700  148.1900      10.1        55       975        96
VIS    2025250    183200   20.2900  148.1500       9.4        67       990        92
VIS    2025250    183200   20.2600  148.1000       8.7        76       975        95
VIS    2025250    183200   20.2600  148.1000       8.8        75       975        94
VIS    2025250    183200   20.2700  148.0600       9.2        74       906        97
VIS    2025250    183200   20.2600  148.0300       9.4        80       882        99
VIS    2025250    183200   20.2600  148.0200       9.2        85       877       100
VIS    2025250    183200   20.2800  148.0000       9.1        82       871        99
VIS    2025250    183200   20.2800  147.9500       7.9        92       841        98
VIS    2025250    183200   20.2800  147.9500       7.9        93       841        96
VIS    2025250    183200   20.2700  147.7300       9.2       100       711        98
VIS    2025250    183200   20.2700  147.7100       8.7        97       721        97
VIS    2025250    183200   20.2800  147.7000       8.7        94       726        97
VIS    2025250    183200   20.2800  147.6700       8.4        92       740        95
VIS    2025250    183200   20.2800  147.6300       8.8        91       737        97
VIS    2025250    183200   20.2600  147.6100       8.5        93       731        95
VIS    2025250    183200   20.2600  147.5800       9.2        87       728        94
VIS    2025250    183200   20.2600  147.5600       9.3        83       728        93
VIS    2025250    183200   20.2700  147.5400       8.8        87       728        95
VIS    2025250    183200   20.2600  147.5200       8.3        86       730        95
VIS    2025250    183200   20.2800  147.4800      10.9        81       723        90
VIS    2025250    183200   20.2800  147.4300      10.3        85       717        92
VIS    2025250    183200   20.2700  147.4200       9.5        81       717        91
VIS    2025250    183200   20.2600  147.3100      10.1        84       722        90
VIS    2025250    183200   20.2800  147.3000       8.8        78       722        91
VIS    2025250    183200   20.2600  147.2600       9.9        87       724        94
VIS    2025250    183200   20.2600  147.2300      12.0        87       733        92
VIS    2025250    183200   20.2600  147.2100      11.1        87       735        93
VIS    2025250    183200   20.2600  147.1900      10.5        86       737        93
VIS    2025250    183200   20.2500  147.1500      10.6        81       741        91
VIS    2025250    183200   20.2500  147.1300      10.8        81       761        91
VIS    2025250    183200   20.2500  147.1200      10.8        80       761        93
VIS    2025250    183200   20.2500  147.0800      12.2        59       862        91
VIS    2025250    183200   20.2500  147.0700      12.6        58       872        91
VIS    2025250    183200   20.2600  147.0300      12.8        59       906        94
VIS    2025250    183200   20.2600  147.0200      12.4        61       920        95
VIS    2025250    183200   20.2500  146.9900      11.5        73       920        93
VIS    2025250    183200   20.2500  146.8300      11.7        89       878        98
VIS    2025250    183200   20.2500  146.8000      10.6        88       850        98
VIS    2025250    183200   20.2700  146.8000      10.4        88       850        97
VIS    2025250    183200   20.2700  146.7600      10.9        80       881        97
VIS    2025250    183200   20.2700  146.7400      10.7        80       840        94
VIS    2025250    183200   20.2700  146.7100      12.3        75       893        97
VIS    2025250    183200   20.2500  146.6800      14.9        69       943        99
VIS    2025250    183200   20.2500  146.6800      14.6        73       943       100
VIS    2025250    183200   20.2500  146.6400      13.1        84       862        98
VIS    2025250    183200   20.2700  146.6100      12.4        89       788        96
VIS    2025250    183200   20.2600  146.6000      12.4        88       785        96
VIS    2025250    183200   20.2500  146.5600      11.7        90       756        96
VIS    2025250    183200   20.2600  146.5500      11.6        88       752        95
VIS    2025250    183200   20.2600  146.5200      12.7        91       752        96
VIS    2025250    183200   20.2600  146.5000      12.9        94       761        98
VIS    2025250    183200   20.2700  146.4700      12.6        94       863        97
VIS    2025250    183200   20.2500  146.4500      12.0        91       903        95
VIS    2025250    183200   20.2600  146.4000      13.6        74       963        94
VIS    2025250    183200   20.2500  146.3500      15.0        64       974        99
VIS    2025250    183200   20.2600  146.3200      13.7        72       926        96
VIS    2025250    183200   20.2500  146.2800      15.3        69       890        94
VIS    2025250    183200   20.2500  146.2800      15.2        69       890        94
VIS    2025250    183200   20.2400  146.2500      15.4        67       906        95
VIS    2025250    183200   20.2400  146.2100      15.8        66       889        90
VIS    2025250    183200   20.2600  146.2000      15.2        69       889        95
VIS    2025250    183200   20.2400  148.2600       9.8        65       960        91
VIS    2025250    183200   20.2500  148.2300       9.6        61       954        91
VIS    2025250    183200   20.2600  148.2100       9.8        57       975        96
VIS    2025250    183200   20.2600  148.2000       9.8        56       975        96
VIS    2025250    183200   20.2500  148.1400       9.1        64       986        97
VIS    2025250    183200   20.2600  148.1000       8.5        73       975        94
VIS    2025250    183200   20.2500  148.0600       8.7        70       906        95
VIS    2025250    183200   20.2600  148.0300       9.4        80       883        99
VIS    2025250    183200   20.2600  148.0100       9.0        85       877       100
VIS    2025250    183200   20.2400  147.9900       8.6        86       866        99
VIS    2025250    183200   20.2400  147.9500      10.1        96       855        95
VIS    2025250    183200   20.2400  147.9400       9.7        95       840        99
VIS    2025250    183200   20.2600  147.9200       8.7        89       753        93
VIS    2025250    183200   20.2500  147.7100       8.5        98       711        95
VIS    2025250    183200   20.2400  147.6900       8.1        95       715        94
VIS    2025250    183200   20.2400  147.6600       7.9        91       748        94
VIS    2025250    183200   20.2500  147.6300       8.1        93       749        92
VIS    2025250    183200   20.2500  147.6200       8.2        93       744        93
VIS    2025250    183200   20.2400  147.6000       8.2        92       731        94
VIS    2025250    183200   20.2300  147.5500       8.9        80       745        96
VIS    2025250    183200   20.2500  147.5500       9.1        82       729        93
VIS    2025250    183200   20.2300  147.5200       8.3        79       750        90
VIS    2025250    183200   20.2500  147.5000       8.4        82       725        92
VIS    2025250    183200   20.2500  147.4000       9.3        83       717        92
VIS    2025250    183200   20.2500  147.3700       8.5        86       719        90
VIS    2025250    183200   20.2400  147.3100      10.5        89       722        96
VIS    2025250    183200   20.2400  147.2900      10.2        95       722        99
VIS    2025250    183200   20.2400  147.2600      10.0        89       725        98
VIS    2025250    183200   20.2300  147.2400      11.5        88       733        98
VIS    2025250    183200   20.2300  147.2100      12.0        87       750        97
VIS    2025250    183200   20.2300  147.1900      10.1        80       744        93
VIS    2025250    183200   20.2300  147.1600      10.0        80       745        95
VIS    2025250    183200   20.2500  147.1500      10.6        80       745        91
VIS    2025250    183200   20.2400  147.1200      10.5        77       761        92
VIS    2025250    183200   20.2500  147.0800      11.7        61       847        94
VIS    2025250    183200   20.2300  147.0500      13.0        54       906        95
VIS    2025250    183200   20.2500  147.0300      12.6        58       920        96
VIS    2025250    183200   20.2300  146.8900       9.9        72       833        90
VIS    2025250    183200   20.2300  146.8600      11.3        80       964        92
VIS    2025250    183200   20.2300  146.8300      11.6        87       885        95
VIS    2025250    183200   20.2400  146.8000      10.5        86       851        94
VIS    2025250    183200   20.2400  146.6800      15.0        69       943        97
VIS    2025250    183200   20.2200  146.6500      13.1        78       879        92
VIS    2025250    183200   20.2200  146.6100      12.7        80       815        95
VIS    2025250    183200   20.2300  146.6000      12.6        84       788        97
VIS    2025250    183200   20.2200  146.5700      11.8        88       770        99
VIS    2025250    183200   20.2400  146.5400      12.5        90       752        95
VIS    2025250    183200   20.2200  146.5100      14.9        88       796        96
VIS    2025250    183200   20.2400  146.4900      13.3        93       872        95
VIS    2025250    183200   20.2400  146.4800      12.5        94       913        93
VIS    2025250    183200   20.2400  146.4600      11.9        92       943        91
VIS    2025250    183200   20.2300  146.4300      12.7        79       946        92
VIS    2025250    183200   20.2200  146.3600      16.9        55       981        96
VIS    2025250    183200   20.2300  146.3400      17.2        58       966        94
VIS    2025250    183200   20.2300  146.3300      15.6        65       923        96
VIS    2025250    183200   20.2200  146.2900      15.3        69       901        94
VIS    2025250    183200   20.2200  146.2600      16.1        70       911        94
VIS    2025250    183200   20.2300  146.2500      15.6        66       912        97
VIS    2025250    183200   20.2300  146.2100      15.9        64       889        93
VIS    2025250    183200   20.2400  146.2100      15.8        65       889        90
VIS    2025250    183200   20.2500  150.3300       6.7        81       972        90
VIS    2025250    183200   20.2500  150.3300       6.7        82       972        91
VIS    2025250    183200   20.2400  150.0200       6.8        78       961        91
VIS    2025250    183200   20.2200  148.8000       9.6        65       997        92
VIS    2025250    183200   20.2400  148.1800      10.3        52       986        90
VIS    2025250    183200   20.2200  148.1600       9.5        68       981        93
VIS    2025250    183200   20.2300  148.1400       9.1        67       986        94
VIS    2025250    183200   20.2100  148.0400       8.7        85       919        92
VIS    2025250    183200   20.2100  148.0000       8.8        87       883        96
VIS    2025250    183200   20.2300  147.9900       8.7        89       865        97
VIS    2025250    183200   20.2300  147.9500      10.2        99       840        95
VIS    2025250    183200   20.2100  147.9500       9.8        96       840        97
VIS    2025250    183200   20.2200  147.9100       9.0        92       715        99
VIS    2025250    183200   20.2300  147.7500       9.2        99       700        96
VIS    2025250    183200   20.2100  147.6800       8.0        91       709        95
VIS    2025250    183200   20.2100  147.6600       8.0        89       724        96
VIS    2025250    183200   20.2100  147.6300       8.2        89       744        96
VIS    2025250    183200   20.2100  147.6100       8.2        90       735        93
VIS    2025250    183200   20.2300  147.5900       8.3        90       729        93
VIS    2025250    183200   20.2200  147.5600       8.7        81       745        96
VIS    2025250    183200   20.2100  147.5400       8.2        80       745        90
VIS    2025250    183200   20.2200  147.5200       8.4        78       750        92
VIS    2025250    183200   20.2300  147.3900       9.5        89       717        93
VIS    2025250    183200   20.2200  147.3500       8.6        94       719        96
VIS    2025250    183200   20.2100  147.3400       9.3        93       720        96
VIS    2025250    183200   20.2100  147.3000      10.9        92       720        97
VIS    2025250    183200   20.2200  147.2900      10.5        94       722        99
VIS    2025250    183200   20.2100  147.2600       9.5        89       729        98
VIS    2025250    183200   20.2000  147.2300      10.0        85       740        96
VIS    2025250    183200   20.2100  147.2100      10.7        82       745        96
VIS    2025250    183200   20.2100  147.1900      10.7        83       746        96
VIS    2025250    183200   20.2200  147.1600       9.8        83       745        96
VIS    2025250    183200   20.2000  147.1400       9.9        80       750        95
VIS    2025250    183200   20.2200  147.1200      10.0        73       761        90
VIS    2025250    183200   20.2000  147.0900      10.6        65       828        91
VIS    2025250    183200   20.2100  147.0700      12.5        58       890        95
VIS    2025250    183200   20.2200  147.0500      13.2        53       906        94
VIS    2025250    183200   20.2000  147.0000      10.9        69       947        91
VIS    2025250    183200   20.2100  146.9900      10.6        72       918        90
VIS    2025250    183200   20.2000  146.8900       9.9        77       837        92
VIS    2025250    183200   20.2000  146.8700      10.9        80       890        94
VIS    2025250    183200   20.2200  146.8400      11.8        87       892        96
VIS    2025250    183200   20.2100  146.6500      12.6        78       879        93
VIS    2025250    183200   20.2000  146.6100      13.5        72       873        93
VIS    2025250    183200   20.2100  146.6000      13.4        77       839        93
VIS    2025250    183200   20.2100  146.5600      12.2        92       788        98
VIS    2025250    183200   20.2000  146.5300      13.8        88       796        97
VIS    2025250    183200   20.2100  146.5200      14.5        88       796        96
VIS    2025250    183200   20.2100  146.4300      12.9        78       948        93
VIS    2025250    183200   20.2000  146.4200      14.5        67       951        95
VIS    2025250    183200   20.2000  146.4000      15.4        61       967        91
VIS    2025250    183200   20.2000  146.3600      15.6        56       960        97
VIS    2025250    183200   20.2000  146.3300      16.1        62       904        93
VIS    2025250    183200   20.2000  146.3300      15.8        63       901        94
VIS    2025250    183200   20.2100  146.3000      15.4        67       899        94
VIS    2025250    183200   20.1900  146.2600      16.2        68       897        96
VIS    2025250    183200   20.2100  146.2600      15.9        69       911        96
VIS    2025250    183200   20.2100  146.2300      15.9        70       899        95
VIS    2025250    183200   20.2300  150.0800       7.0        74       929        97
VIS    2025250    183200   20.2300  150.0600       6.9        75       929        98
VIS    2025250    183200   20.2200  150.0300       6.6        75       956        94
VIS    2025250    183200   20.2100  150.0000       6.9        80       921        97
VIS    2025250    183200   20.1900  148.1700       9.5        73       980        90
VIS    2025250    183200   20.1900  148.1500       9.7        72       956        95
VIS    2025250    183200   20.1900  148.1400       9.6        73       956        95
VIS    2025250    183200   20.1900  148.1100       9.2        76       921        93
VIS    2025250    183200   20.1900  148.0500       8.8        85       919        93
VIS    2025250    183200   20.2100  148.0500       8.6        85       919        91
VIS    2025250    183200   20.2100  148.0000       8.8        86       883        96
VIS    2025250    183200   20.2100  147.9900       9.1        89       873        96
VIS    2025250    183200   20.2000  147.9500       9.4        90       812        99
VIS    2025250    183200   20.1900  147.9400       9.1        89       812        98
VIS    2025250    183200   20.1900  147.9200       7.7        87       714        98
VIS    2025250    183200   20.2000  147.6900       8.4        93       705        97
VIS    2025250    183200   20.2000  147.6700       8.1        90       717        96
VIS    2025250    183200   20.1900  147.6300       8.6        85       731        96
VIS    2025250    183200   20.1900  147.6100       8.3        89       730        94
VIS    2025250    183200   20.1800  147.5700       7.8        87       730        95
VIS    2025250    183200   20.1900  147.5700       7.7        86       730        94
VIS    2025250    183200   20.2000  147.5400       8.1        80       745        90
VIS    2025250    183200   20.1800  147.5100       7.7        81       739        90
VIS    2025250    183200   20.2000  147.4300      11.9        84       724        90
VIS    2025250    183200   20.1900  147.4200      11.8        86       724        93
VIS    2025250    183200   20.1900  147.3800       9.9        93       718        99
VIS    2025250    183200   20.1800  147.3700      10.0        93       718        99
VIS    2025250    183200   20.2000  147.3500       9.5        95       720        98
VIS    2025250    183200   20.1900  147.3100      10.9        88       722        96
VIS    2025250    183200   20.1900  147.2800      10.5        90       728        98
VIS    2025250    183200   20.1900  147.2500       9.8        87       732        98
VIS    2025250    183200   20.1800  147.2500       9.8        86       734        97
VIS    2025250    183200   20.1900  147.2000      10.1        83       744        93
VIS    2025250    183200   20.1800  147.1900      10.4        90       743        99
VIS    2025250    183200   20.1800  147.1700      10.3        89       746        99
VIS    2025250    183200   20.2000  147.1300       9.8        78       753        94
VIS    2025250    183200   20.1800  147.0700      11.2        67       893        90
VIS    2025250    183200   20.1800  147.0500      12.3        65       957        96
VIS    2025250    183200   20.1800  147.0100      10.1        76       947        90
VIS    2025250    183200   20.1800  146.9500      10.3        88       873        94
VIS    2025250    183200   20.1800  146.9200      10.4        93       853        93
VIS    2025250    183200   20.2000  146.8900      10.0        79       843        92
VIS    2025250    183200   20.1800  146.8300      11.1        80       890        96
VIS    2025250    183200   20.1800  146.8100      11.0        78       908        92
VIS    2025250    183200   20.1700  146.7200      13.9        73       990        97
VIS    2025250    183200   20.1800  146.6300      13.5        69       925        92
VIS    2025250    183200   20.1800  146.6100      14.7        66       915        96
VIS    2025250    183200   20.1800  146.5900      15.2        69       913        93
VIS    2025250    183200   20.1700  146.4700      14.4        63       991        98
VIS    2025250    183200   20.1800  146.4500      17.7        54       950        94
VIS    2025250    183200   20.1700  146.4300      15.5        62       931        97
VIS    2025250    183200   20.1700  146.3900      14.6        65       931        96
VIS    2025250    183200   20.1800  146.3800      14.9        61       931        97
VIS    2025250    183200   20.1900  146.3300      15.9        63       902        94
VIS    2025250    183200   20.1900  146.3300      15.6        65       899        94
VIS    2025250    183200   20.1700  146.2900      15.1        72       889        97
VIS    2025250    183200   20.1900  146.2600      15.8        70       889        97
VIS    2025250    183200   20.2000  150.5500       7.3        79       998        90
VIS    2025250    183200   20.2100  150.1000       7.3        71       939        90
VIS    2025250    183200   20.2000  150.0600       6.5        68       922        95
VIS    2025250    183200   20.2000  150.0300       6.8        74       922        93
VIS    2025250    183200   20.2100  150.0000       7.1        81       925        96
VIS    2025250    183200   20.2000  149.9700       7.1        81       946        90
VIS    2025250    183200   20.1700  148.1800       9.3        83       988        90
VIS    2025250    183200   20.1900  148.1600       9.6        73       956        94
VIS    2025250    183200   20.1800  148.1500       9.5        76       964        94
VIS    2025250    183200   20.1800  148.1100       9.3        77       915        94
VIS    2025250    183200   20.1700  148.0900       9.6        81       909        92
VIS    2025250    183200   20.1800  148.0500       8.9        83       912        95
VIS    2025250    183200   20.1700  148.0400       9.4        82       909        96
VIS    2025250    183200   20.1600  148.0000       9.3        81       882        98
VIS    2025250    183200   20.1800  147.9900       8.8        83       882        97
VIS    2025250    183200   20.1800  147.9600       9.2        86       842        98
VIS    2025250    183200   20.1800  147.9400       8.7        89       807        98
VIS    2025250    183200   20.1700  147.9100       7.5        95       711        91
VIS    2025250    183200   20.1600  147.6900       9.2        94       708        98
VIS    2025250    183200   20.1600  147.6700       9.0        93       711        97
VIS    2025250    183200   20.1700  147.6400       8.8        86       719        93
VIS    2025250    183200   20.1700  147.6100       8.2        87       729        94
VIS    2025250    183200   20.1700  147.5800       7.9        85       730        94
VIS    2025250    183200   20.1600  147.5600       7.9        83       730        92
VIS    2025250    183200   20.1700  147.5500       7.7        85       730        93
VIS    2025250    183200   20.1800  147.5200       7.6        85       730        92
VIS    2025250    183200   20.1600  147.4800       7.8        73       745        90
VIS    2025250    183200   20.1600  147.4700       8.4        78       745        94
VIS    2025250    183200   20.1600  147.4400       9.6        85       735        97
VIS    2025250    183200   20.1600  147.4100      10.6        88       724        97
VIS    2025250    183200   20.1600  147.3900      10.4        87       721        97
VIS    2025250    183200   20.1800  147.3700      10.1        91       718        98
VIS    2025250    183200   20.1700  147.3300      10.0        86       720        95
VIS    2025250    183200   20.1600  147.3100       9.4        84       723        95
VIS    2025250    183200   20.1600  147.2900      10.0        84       728        94
VIS    2025250    183200   20.1600  147.2500      10.6        83       737        92
VIS    2025250    183200   20.1600  147.2400      10.3        81       742        94
VIS    2025250    183200   20.1700  147.2200       9.8        85       743        96
VIS    2025250    183200   20.1700  147.1900      10.3        91       743        99
VIS    2025250    183200   20.1600  147.1800      10.1        92       743        99
VIS    2025250    183200   20.1500  147.1400      10.1        82       748        94
VIS    2025250    183200   20.1700  147.1000      10.1        75       782        91
VIS    2025250    183200   20.1700  147.0500      12.2        66       957        93
VIS    2025250    183200   20.1600  147.0200      10.8        76       952        92
VIS    2025250    183200   20.1700  146.9200      10.4        95       869        92
VIS    2025250    183200   20.1500  146.7900      13.1        70       985        95
VIS    2025250    183200   20.1500  146.7500      13.7        68       996        95
VIS    2025250    183200   20.1500  146.7100      12.7        76       970        92
VIS    2025250    183200   20.1600  146.6900      12.8        75       953        95
VIS    2025250    183200   20.1500  146.6700      11.9        77       934        94
VIS    2025250    183200   20.1600  146.6300      14.4        65       936        97
VIS    2025250    183200   20.1700  146.6200      14.6        65       931        95
VIS    2025250    183200   20.1500  146.6000      16.6        64       927        95
VIS    2025250    183200   20.1500  146.4900      14.4        62       977       100
VIS    2025250    183200   20.1500  146.4500      16.1        58       918        95
VIS    2025250    183200   20.1700  146.4300      16.0        62       931        96
VIS    2025250    183200   20.1600  146.4000      15.6        63       929        90
VIS    2025250    183200   20.1700  146.3800      14.7        65       929        96
VIS    2025250    183200   20.1500  146.3500      14.9        70       895        97
VIS    2025250    183200   20.1400  146.3200      14.7        74       856        98
VIS    2025250    183200   20.1500  146.3000      14.9        71       856        97
VIS    2025250    183200   20.1600  146.2700      15.2        66       879        96
VIS    2025250    183200   20.1800  150.5700       8.1        69       974        90
VIS    2025250    183200   20.1600  148.1700       9.3        80       988        91
VIS    2025250    183200   20.1600  148.1700       9.3        78       984        91
VIS    2025250    183200   20.1400  148.1300       9.7        78       949        91
VIS    2025250    183200   20.1400  148.0200       9.6        83       874        98
VIS    2025250    183200   20.1400  148.0200       9.7        83       874        98
VIS    2025250    183200   20.1500  147.9900       9.3        83       874        98
VIS    2025250    183200   20.1400  147.9600       9.0        91       834        96
VIS    2025250    183200   20.1500  147.9300       8.6        94       746        98
VIS    2025250    183200   20.1600  147.9100       7.6        94       730        91
VIS    2025250    183200   20.1400  147.8900       8.5       102       709        91
VIS    2025250    183200   20.1400  147.8000       9.4        97       702        93
VIS    2025250    183200   20.1400  147.7900       9.0        95       702        95
VIS    2025250    183200   20.1400  147.7100       9.2        93       706        97
VIS    2025250    183200   20.1300  147.6800       9.5        94       706        98
VIS    2025250    183200   20.1400  147.6700       9.3        94       710        98
VIS    2025250    183200   20.1300  147.6300       8.9        93       719        98
VIS    2025250    183200   20.1300  147.6000       8.1        87       729        96
VIS    2025250    183200   20.1400  147.5800       8.1        83       730        94
VIS    2025250    183200   20.1500  147.5600       7.9        84       730        93
VIS    2025250    183200   20.1500  147.5300       7.2        88       731        93
VIS    2025250    183200   20.1400  147.4800       8.5        84       782        98
VIS    2025250    183200   20.1500  147.4700       8.6        80       745        96
VIS    2025250    183200   20.1500  147.4400       9.4        85       735        96
VIS    2025250    183200   20.1500  147.4100      10.1        85       724        96
VIS    2025250    183200   20.1300  147.3800      10.0        86       722        96
VIS    2025250    183200   20.1500  147.3700      10.0        88       718        97
VIS    2025250    183200   20.1500  147.3300       9.2        85       723        96
VIS    2025250    183200   20.1500  147.3100       9.3        83       725        95
VIS    2025250    183200   20.1500  147.2700      10.8        79       730        91
VIS    2025250    183200   20.1400  147.2600      10.9        77       735        90
VIS    2025250    183200   20.1300  147.2200      10.6        74       744        93
VIS    2025250    183200   20.1400  147.2000      10.1        81       745        96
VIS    2025250    183200   20.1400  147.1800       9.8        90       743        98
VIS    2025250    183200   20.1400  147.1600       9.8        89       745        97
VIS    2025250    183200   20.1300  147.1300      10.7        77       791        94
VIS    2025250    183200   20.1400  147.1100      10.8        75       804        92
VIS    2025250    183200   20.1300  147.0900      11.3        74       865        93
VIS    2025250    183200   20.1300  147.0600      12.0        76       897        91
VIS    2025250    183200   20.1300  146.9900      11.0        78       933        91
VIS    2025250    183200   20.1500  146.8700      11.9        68       921        90
VIS    2025250    183200   20.1400  146.8000      13.2        69       926        97
VIS    2025250    183200   20.1200  146.7900      14.2        67       994        96
VIS    2025250    183200   20.1400  146.7500      13.0        70       988        97
VIS    2025250    183200   20.1400  146.7400      12.8        70       988        96
VIS    2025250    183200   20.1200  146.7200      11.9        79       972        90
VIS    2025250    183200   20.1200  146.6900      11.5        84       882        97
VIS    2025250    183200   20.1200  146.6600      10.9        84       916        91
VIS    2025250    183200   20.1400  146.6100      15.7        63       936        97
VIS    2025250    183200   20.1400  146.5100      13.9        67       986        98
VIS    2025250    183200   20.1400  146.4500      16.0        59       918        95
VIS    2025250    183200   20.1200  146.4200      15.6        67       918        94
VIS    2025250    183200   20.1300  146.4000      16.0        64       915        91
VIS    2025250    183200   20.1300  146.3500      15.4        68       895        96
VIS    2025250    183200   20.1400  146.3500      15.1        70       895        97
VIS    2025250    183200   20.1200  146.3100      15.1        65       856        93
VIS    2025250    183200   20.1300  146.2800      15.3        63       852        92
VIS    2025250    183200   20.1300  146.2700      15.5        63       841        91
VIS    2025250    183200   20.1700  152.1200       5.1        74       979        96
VIS    2025250    183200   20.1700  152.0500       5.7        78       977        94
VIS    2025250    183200   20.1400  148.8100       9.0        66       979        93
VIS    2025250    183200   20.1400  148.1700       9.4        79       988        92
VIS    2025250    183200   20.1400  148.1600       9.0        79       988        90
VIS    2025250    183200   20.1300  148.1300       9.2        78       956        90
VIS    2025250    183200   20.1200  148.0900       9.8        79       924        93
VIS    2025250    183200   20.1100  148.0400       9.4        83       871        98
VIS    2025250    183200   20.1300  148.0100       9.8        82       871        98
VIS    2025250    183200   20.1200  147.9700       9.5        88       863        96
VIS    2025250    183200   20.1100  147.9600       9.4        89       845        97
VIS    2025250    183200   20.1200  147.9300       8.8        93       815        97
VIS    2025250    183200   20.1100  147.9100       8.6        92       803        97
VIS    2025250    183200   20.1100  147.8900       9.2        89       715        95
VIS    2025250    183200   20.1200  147.8600      10.2        93       708        91
VIS    2025250    183200   20.1200  147.7900       9.2        97       706        95
VIS    2025250    183200   20.1200  147.7500       9.0        92       705        96
VIS    2025250    183200   20.1100  147.7200       9.0        90       701        94
VIS    2025250    183200   20.1300  147.7100       9.1        92       704        97
VIS    2025250    183200   20.1300  147.6800       9.5        94       706        98
VIS    2025250    183200   20.1100  147.6600       9.5        93       706        98
VIS    2025250    183200   20.1100  147.6400       9.2        95       715        99
VIS    2025250    183200   20.1200  147.6000       8.6        90       725        97
VIS    2025250    183200   20.1200  147.5900       8.3        88       730        96
VIS    2025250    183200   20.1200  147.5600       8.1        87       732        96
VIS    2025250    183200   20.1100  147.5300       7.8        77       737        93
VIS    2025250    183200   20.1100  147.4600       9.0        87       784        98
VIS    2025250    183200   20.1100  147.4300       9.4        86       734        96
VIS    2025250    183200   20.1200  147.4000       9.8        81       726        94
VIS    2025250    183200   20.1100  147.3900      10.0        81       722        93
VIS    2025250    183200   20.1100  147.3600       9.9        85       719        95
VIS    2025250    183200   20.1100  147.3300      10.0        85       723        95
VIS    2025250    183200   20.1100  147.3000      10.5        84       723        95
VIS    2025250    183200   20.1100  147.2800      10.6        84       723        95
VIS    2025250    183200   20.1200  147.2500      10.6        73       738        92
VIS    2025250    183200   20.1200  147.2200      10.7        71       744        92
VIS    2025250    183200   20.1100  147.1900      10.1        73       745        91
VIS    2025250    183200   20.1200  147.1700       9.6        83       744        91
VIS    2025250    183200   20.1100  147.1300      10.7        80       826        96
VIS    2025250    183200   20.1200  147.1100      10.9        75       845        97
VIS    2025250    183200   20.1100  147.0900      11.7        73       883        98
VIS    2025250    183200   20.1000  147.0500      11.1        78       897        97
VIS    2025250    183200   20.1000  147.0400      11.0        80       897        97
VIS    2025250    183200   20.1000  146.9800      11.2        77       923        96
VIS    2025250    183200   20.1100  146.7600      13.3        70       988        97
VIS    2025250    183200   20.1200  146.7400      12.4        71       988        95
VIS    2025250    183200   20.1000  146.7000      10.9        93       835        96
VIS    2025250    183200   20.1000  146.6800      11.3        99       779        97
VIS    2025250    183200   20.1200  146.6600      11.8        81       916        94
VIS    2025250    183200   20.1000  146.6100      14.3        61       953        95
VIS    2025250    183200   20.1000  146.5900      15.5        62       938        97
VIS    2025250    183200   20.1000  146.5500      14.4        64       941        97
VIS    2025250    183200   20.1000  146.5300      14.4        64       950        99
VIS    2025250    183200   20.1000  146.5200      14.8        66       986        99
VIS    2025250    183200   20.1200  146.4500      15.3        63       922        90
VIS    2025250    183200   20.1200  146.4200      15.5        67       918        93
VIS    2025250    183200   20.1000  146.3900      15.7        68       907        94
VIS    2025250    183200   20.1000  146.3500      15.5        72       871        97
VIS    2025250    183200   20.1100  146.3300      15.5        66       856        93
VIS    2025250    183200   20.1100  146.3200      15.4        65       852        92
VIS    2025250    183200   20.1100  146.2800      14.8        61       838        90
VIS    2025250    183200   20.1700  152.1300       5.0        73       979        97
VIS    2025250    183200   20.1600  152.0500       5.6        79       977        93
VIS    2025250    183200   20.1000  148.8100       9.9        57       966        92
VIS    2025250    183200   20.1000  148.1400       8.4        66       956        96
VIS    2025250    183200   20.1000  148.1300       8.7        68       956        96
VIS    2025250    183200   20.0900  148.0900       8.8        72       924        97
VIS    2025250    183200   20.1100  148.0600       9.1        81       924        93
VIS    2025250    183200   20.1100  148.0400       9.3        82       869        98
VIS    2025250    183200   20.0900  148.0200       9.4        85       869        96
VIS    2025250    183200   20.1000  147.9800       9.8        88       863        96
VIS    2025250    183200   20.0900  147.9700       9.5        86       851        97
VIS    2025250    183200   20.1100  147.9500       8.8        91       837        97
VIS    2025250    183200   20.1000  147.9100       8.7        93       820        97
VIS    2025250    183200   20.0900  147.9000       9.0        92       803        97
VIS    2025250    183200   20.0900  147.8800      10.1        83       715        93
VIS    2025250    183200   20.1100  147.8500      10.3        90       708        92
VIS    2025250    183200   20.1000  147.8100       9.4        99       708        95
VIS    2025250    183200   20.0900  147.8000       9.4        99       708        95
VIS    2025250    183200   20.1000  147.7600       9.2        94       706        96
VIS    2025250    183200   20.1100  147.7500       9.1        92       705        97
VIS    2025250    183200   20.1000  147.7200       9.1        89       701        94
VIS    2025250    183200   20.1000  147.6900       9.5        91       701        94
VIS    2025250    183200   20.1000  147.6700       9.4        92       705        96
VIS    2025250    183200   20.1000  147.6400       9.1        94       712        98
VIS    2025250    183200   20.1000  147.6300       9.0        93       716        98
VIS    2025250    183200   20.0800  147.6000       8.9        84       725        96
VIS    2025250    183200   20.0900  147.5700       8.3        82       732        95
VIS    2025250    183200   20.0900  147.5500       7.8        80       732        91
VIS    2025250    183200   20.0800  147.4700       9.0        79       782        96
VIS    2025250    183200   20.0800  147.4500       9.5        82       749        94
VIS    2025250    183200   20.1000  147.4300       9.4        85       734        96
VIS    2025250    183200   20.1000  147.3800      10.1        81       720        93
VIS    2025250    183200   20.1000  147.3800      10.1        82       720        92
VIS    2025250    183200   20.1000  147.3300      10.1        86       723        95
VIS    2025250    183200   20.0900  147.3200      10.4        85       723        93
VIS    2025250    183200   20.0900  147.3000      10.4        85       723        94
VIS    2025250    183200   20.0800  147.2600      10.2        81       723        94
VIS    2025250    183200   20.0800  147.2500      10.0        77       728        93
VIS    2025250    183200   20.0900  147.1500      10.5        79       765        91
VIS    2025250    183200   20.0900  147.1100      11.2        77       828        97
VIS    2025250    183200   20.0800  147.1000      11.9        70       828        96
VIS    2025250    183200   20.0900  147.0700      13.0        63       821        92
VIS    2025250    183200   20.0800  147.0500      12.4        67       903        98
VIS    2025250    183200   20.0900  147.0200      11.2        82       919        91
VIS    2025250    183200   20.0800  146.9600      10.7        78       919        92
VIS    2025250    183200   20.1000  146.9600      10.2        78       924        90
VIS    2025250    183200   20.0700  146.8100      13.5        62       994        95
VIS    2025250    183200   20.0900  146.7600      13.7        69       988        90
VIS    2025250    183200   20.0900  146.7600      13.5        70       986        92
VIS    2025250    183200   20.0800  146.7200      11.4        88       799        98
VIS    2025250    183200   20.0800  146.7000      11.0        99       779        97
VIS    2025250    183200   20.0800  146.6200      14.1        62       965        96
VIS    2025250    183200   20.0900  146.5900      15.2        62       938        96
VIS    2025250    183200   20.0800  146.5800      14.7        62       939        95
VIS    2025250    183200   20.0900  146.5400      14.3        62       941        93
VIS    2025250    183200   20.0900  146.5100      14.9        67       972        99
VIS    2025250    183200   20.0900  146.5100      15.3        67       986        98
VIS    2025250    183200   20.0900  146.4700      15.4        59       936        94
VIS    2025250    183200   20.0700  146.4500      15.1        60       923        94
VIS    2025250    183200   20.0700  146.4100      15.4        64       913        95
VIS    2025250    183200   20.0700  146.4000      15.5        66       906        95
VIS    2025250    183200   20.0900  146.3900      15.5        69       906        96
VIS    2025250    183200   20.0800  146.3500      14.9        73       854        90
VIS    2025250    183200   20.0700  146.3000      14.7        67       826        91
VIS    2025250    183200   20.1100  150.9800       6.2        69       997        94
VIS    2025250    183200   20.1100  150.9500       6.4        75       998        91
VIS    2025250    183200   20.0800  149.0700       9.3        57       991        94
VIS    2025250    183200   20.0900  149.0400       9.1        63       989        94
VIS    2025250    183200   20.0700  148.8300       9.7        56       966        92
VIS    2025250    183200   20.0900  148.8000       9.6        55       966        94
VIS    2025250    183200   20.0800  148.8000       9.7        55       965        94
VIS    2025250    183200   20.0700  148.2500       9.4        59       984        92
VIS    2025250    183200   20.0900  148.2400      10.1        53       988        93
VIS    2025250    183200   20.0700  148.2200       9.4        62       988        92
VIS    2025250    183200   20.0600  148.1500       8.6        68       956        93
VIS    2025250    183200   20.0600  148.1100       8.7        53       910        96
VIS    2025250    183200   20.0800  148.1000       8.4        68       914        97
VIS    2025250    183200   20.0800  148.0700       8.4        81       961        90
VIS    2025250    183200   20.0800  148.0200       9.3        87       869        95
VIS    2025250    183200   20.0700  147.9900      10.0        85       886        92
VIS    2025250    183200   20.0800  147.9600       9.5        83       843        99
VIS    2025250    183200   20.0600  147.9500       9.7        81       843       100
VIS    2025250    183200   20.0600  147.9200       8.7        86       837        98
VIS    2025250    183200   20.0800  147.8900       9.2        88       740        98
VIS    2025250    183200   20.0600  147.8500       9.9        84       709        93
VIS    2025250    183200   20.0600  147.8400       9.6        86       709        95
VIS    2025250    183200   20.0600  147.8200       9.2        88       710        96
VIS    2025250    183200   20.0700  147.7900       9.1        95       710        97
VIS    2025250    183200   20.0700  147.7700       9.1        95       706        97
VIS    2025250    183200   20.0800  147.7400       9.0        91       705        97
VIS    2025250    183200   20.0700  147.6800       9.6        87       701        93
VIS    2025250    183200   20.0800  147.6700       9.4        90       704        93
VIS    2025250    183200   20.0800  147.6300       8.9        91       712        96
VIS    2025250    183200   20.0700  147.6200       8.7        87       725        96
VIS    2025250    183200   20.0700  147.6000       8.9        81       728        95
VIS    2025250    183200   20.0800  147.5600       8.4        75       734        93
VIS    2025250    183200   20.0800  147.5500       8.0        73       734        92
VIS    2025250    183200   20.0700  147.4800       9.0        72       752        91
VIS    2025250    183200   20.0800  147.4700       9.3        77       777        95
VIS    2025250    183200   20.0800  147.4500       9.4        80       747        92
VIS    2025250    183200   20.0800  147.4300       9.5        83       729        91
VIS    2025250    183200   20.0600  147.3900       9.9        86       716        95
VIS    2025250    183200   20.0600  147.3700      10.1        85       719        93
VIS    2025250    183200   20.0600  147.3300      10.3        86       725        94
VIS    2025250    183200   20.0600  147.3100      10.3        81       721        92
VIS    2025250    183200   20.0800  147.2900      10.2        84       722        93
VIS    2025250    183200   20.0700  147.2600       9.8        76       728        93
VIS    2025250    183200   20.0500  147.2300       9.4        73       745        92
VIS    2025250    183200   20.0600  147.2300       9.5        70       745        91
VIS    2025250    183200   20.0600  147.1700      10.0        79       747        92
VIS    2025250    183200   20.0500  147.1500      10.4        78       747        95
VIS    2025250    183200   20.0700  147.1100      12.0        69       827        96
VIS    2025250    183200   20.0600  147.0500      13.0        60       909        96
VIS    2025250    183200   20.0500  147.0300      12.9        65       919        97
VIS    2025250    183200   20.0700  146.9800      11.5        77       919        96
VIS    2025250    183200   20.0700  146.9600      10.9        77       928        92
VIS    2025250    183200   20.0700  146.9400      10.7        70       943        92
VIS    2025250    183200   20.0700  146.9100      10.3        71       943        95
VIS    2025250    183200   20.0500  146.7900      14.2        64       979        90
VIS    2025250    183200   20.0700  146.6400      14.4        66       974        92
VIS    2025250    183200   20.0600  146.6300      14.9        63       974        94
VIS    2025250    183200   20.0600  146.5400      15.0        65       923        93
VIS    2025250    183200   20.0500  146.5100      15.1        62       958        97
VIS    2025250    183200   20.0600  146.5000      15.4        63       958        99
VIS    2025250    183200   20.0500  146.4800      15.7        61       948        98
VIS    2025250    183200   20.0700  146.4500      14.9        61       923        94
VIS    2025250    183200   20.0600  146.4200      14.7        65       906        95
VIS    2025250    183200   20.0500  146.4100      15.6        67       897        96
VIS    2025250    183200   20.0500  146.3800      16.1        65       876        91
VIS    2025250    183200   20.0600  146.3500      14.9        69       849        91
VIS    2025250    183200   20.0700  150.4200       7.2        84       920        91
VIS    2025250    183200   20.0700  150.4200       7.3        84       920        91
VIS    2025250    183200   20.0700  149.0700       9.1        56       992        92
VIS    2025250    183200   20.0600  149.0300       8.9        57       977        93
VIS    2025250    183200   20.0600  149.0100       8.9        58       989        90
VIS    2025250    183200   20.0600  148.8100       9.4        54       965        95
VIS    2025250    183200   20.0400  148.2600       9.2        65       967        92
VIS    2025250    183200   20.0400  148.2600       9.2        65       967        93
VIS    2025250    183200   20.0600  148.2300       9.3        62       984        93
VIS    2025250    183200   20.0400  148.2100       9.5        64       988        90
VIS    2025250    183200   20.0400  148.1600       9.2        70       978        94
VIS    2025250    183200   20.0500  148.1600       9.2        68       978        94
VIS    2025250    183200   20.0500  147.9600      10.0        79       874        98
VIS    2025250    183200   20.0500  147.9600      10.0        80       874        99
VIS    2025250    183200   20.0600  147.9200       8.5        86       825        96
VIS    2025250    183200   20.0500  147.8800       9.2        86       734        95
VIS    2025250    183200   20.0500  147.8500       9.6        84       709        93
VIS    2025250    183200   20.0400  147.8100       9.2        82       710        94
VIS    2025250    183200   20.0600  147.8000       9.0        90       712        98
VIS    2025250    183200   20.0600  147.7600       9.1        92       705        96
VIS    2025250    183200   20.0500  147.7600       9.2        92       703        95
VIS    2025250    183200   20.0500  147.7200       9.4        92       701        96
VIS    2025250    183200   20.0400  147.6600      10.0        86       702        95
VIS    2025250    183200   20.0300  147.6600      10.2        87       702        95
VIS    2025250    183200   20.0400  147.6300       9.5        88       710        95
VIS    2025250    183200   20.0500  147.5900       8.7        76       730        92
VIS    2025250    183200   20.0300  147.5100       9.7        72       750        91
VIS    2025250    183200   20.0300  147.5100       9.8        72       751        92
VIS    2025250    183200   20.0500  147.4200       9.0        81       722        91
VIS    2025250    183200   20.0500  147.3900       9.9        87       716        96
VIS    2025250    183200   20.0400  147.3700      10.6        88       718        97
VIS    2025250    183200   20.0300  147.3500      10.7        89       718        97
VIS    2025250    183200   20.0300  147.3200      10.4        84       721        95
VIS    2025250    183200   20.0500  147.3000      10.3        77       721        91
VIS    2025250    183200   20.0500  147.2500       9.4        72       730        92
VIS    2025250    183200   20.0500  147.2300       9.3        75       745        93
VIS    2025250    183200   20.0300  147.1900      10.2        75       749        90
VIS    2025250    183200   20.0300  147.1700      10.0        76       748        90
VIS    2025250    183200   20.0400  147.1400      10.4        80       757        95
VIS    2025250    183200   20.0300  147.1100      11.6        73       779        92
VIS    2025250    183200   20.0300  147.1100      11.9        70       746        91
VIS    2025250    183200   20.0300  147.0300      12.1        70       909        96
VIS    2025250    183200   20.0300  147.0100      12.5        63       913        96
VIS    2025250    183200   20.0300  146.9800      11.4        65       941        96
VIS    2025250    183200   20.0300  146.9500      10.1        74       962        91
VIS    2025250    183200   20.0200  146.6200      11.9        68       984        97
VIS    2025250    183200   20.0300  146.5400      14.1        69       915        95
VIS    2025250    183200   20.0400  146.4700      15.2        65       929        98
VIS    2025250    183200   20.0200  146.4600      15.0        67       923        99
VIS    2025250    183200   20.0200  146.4200      15.3        68       885        96
VIS    2025250    183200   20.0400  146.4100      15.8        67       885        95
VIS    2025250    183200   20.0500  150.4200       7.3        85       920        91
VIS    2025250    183200   20.0400  150.3900       6.9        82       920        92
VIS    2025250    183200   20.0500  150.3700       7.2        81       943        91
VIS    2025250    183200   20.0500  149.0300       8.8        55       970        93
VIS    2025250    183200   20.0500  149.0200       8.8        56       977        93
VIS    2025250    183200   20.0500  148.9800       9.0        58       997        96
VIS    2025250    183200   20.0400  148.2600       9.2        66       967        92
VIS    2025250    183200   20.0200  148.2300       9.2        67       967        92
VIS    2025250    183200   20.0200  148.2100       9.3        63       975        93
VIS    2025250    183200   20.0400  148.1900       9.6        65       999        93
VIS    2025250    183200   20.0200  148.1600       9.1        75       960        92
VIS    2025250    183200   20.0200  147.9700      10.9        83       891        93
VIS    2025250    183200   20.0300  147.9700      10.7        82       890        95
VIS    2025250    183200   20.0100  147.9200       9.0        87       847        91
VIS    2025250    183200   20.0300  147.9200       8.5        86       829        91
VIS    2025250    183200   20.0300  147.8900       9.2        91       750        96
VIS    2025250    183200   20.0200  147.8600       9.4        90       709        94
VIS    2025250    183200   20.0300  147.8400       9.4        84       706        94
VIS    2025250    183200   20.0300  147.8100       9.4        81       710        94
VIS    2025250    183200   20.0200  147.7900       9.6        83       710        94
VIS    2025250    183200   20.0300  147.7500       9.6        88       701        93
VIS    2025250    183200   20.0200  147.7300       9.8        87       700        96
VIS    2025250    183200   20.0200  147.6600      10.0        88       702        95
VIS    2025250    183200   20.0100  147.4700       9.9        69       739        90
VIS    2025250    183200   20.0200  147.4500       9.3        73       727        90
VIS    2025250    183200   20.0100  147.4400       9.4        81       724        92
VIS    2025250    183200   20.0100  147.4100      10.3        92       721        97
VIS    2025250    183200   20.0100  147.3700      11.6        89       722        96
VIS    2025250    183200   20.0200  147.3500      11.1        87       718        96
VIS    2025250    183200   20.0100  147.3300      10.5        80       720        92
VIS    2025250    183200   20.0300  147.3100      10.2        82       721        94
VIS    2025250    183200   20.0100  147.2900      10.2        77       722        90
VIS    2025250    183200   20.0200  147.2500       9.6        76       730        90
VIS    2025250    183200   20.0200  147.2300       9.5        81       747        90
VIS    2025250    183200   20.0200  147.1500      10.0        85       751        93
VIS    2025250    183200   20.0200  147.1400      10.1        84       748        92
VIS    2025250    183200   20.0200  147.0300      11.8        73       901        92
VIS    2025250    183200   20.0100  146.7200      12.9        87       848        95
VIS    2025250    183200   20.0000  146.5400      15.1        66       969        96
VIS    2025250    183200   20.0100  146.5000      15.1        67       945        96
VIS    2025250    183200   20.0100  146.5000      15.3        67       945        96
VIS    2025250    183200   20.0200  146.4600      15.2        67       922        99
VIS    2025250    183200   20.0100  146.4300      15.5        68       901        98
VIS    2025250    183200   20.0200  146.4100      15.8        69       864        95
VIS    2025250    183200   20.0300  150.8800       6.0        72       986        95
VIS    2025250    183200   20.0300  150.4600       6.6        80       972        91
VIS    2025250    183200   20.0300  150.4400       6.7        82       920        93
VIS    2025250    183200   20.0200  149.0100       8.9        55       991        91
VIS    2025250    183200   20.0100  148.9800       9.1        59       991        96
VIS    2025250    183200   20.0000  148.7900       9.8        52       952        93
VIS    2025250    183200   19.9900  148.2500       9.2        65       968        92
VIS    2025250    183200   20.0100  148.2400       9.2        67       967        92
VIS    2025250    183200   20.0000  148.2100       9.2        64       975        92
VIS    2025250    183200   20.0000  148.1500       8.5        80       977        90
VIS    2025250    183200   19.9900  148.0000       9.7        69       924        93
VIS    2025250    183200   20.0000  147.9900      10.1        78       909        90
VIS    2025250    183200   19.9900  147.9600      10.6        82       886        95
VIS    2025250    183200   20.0000  147.9400       9.8        83       860        95
VIS    2025250    183200   20.0000  147.9200       9.5        90       847        94
VIS    2025250    183200   20.0100  147.8900       9.5        97       760        92
VIS    2025250    183200   20.0000  147.8500       9.2        91       726        95
VIS    2025250    183200   20.0000  147.8400       9.3        87       707        91
VIS    2025250    183200   19.9900  147.8000       9.5        87       710        95
VIS    2025250    183200   20.0100  147.7900       9.7        85       709        94
VIS    2025250    183200   19.9900  147.7600       9.6        89       706        95
VIS    2025250    183200   19.9900  147.7300       9.5        83       700        93
VIS    2025250    183200   19.9800  147.4400       9.4        80       722        93
VIS    2025250    183200   19.9900  147.4100      10.7        94       722        96
VIS    2025250    183200   19.9900  147.3800      11.9        89       722        95
VIS    2025250    183200   19.9800  147.3500      11.2        76       721        91
VIS    2025250    183200   20.0000  147.3300      10.4        77       721        91
VIS    2025250    183200   20.0000  147.3200      10.3        78       721        91
VIS    2025250    183200   19.9900  147.2900      10.2        79       726        93
VIS    2025250    183200   19.9800  147.2600      10.2        83       726        92
VIS    2025250    183200   19.9800  147.2300       9.8        81       751        90
VIS    2025250    183200   19.9800  147.2000       9.8        81       761        92
VIS    2025250    183200   20.0000  147.1500      10.0        91       750        92
VIS    2025250    183200   19.9800  147.0900      12.7        67       865        95
VIS    2025250    183200   19.9900  147.0600      12.1        73       874        92
VIS    2025250    183200   19.9900  146.8800      13.4        73       981        94
VIS    2025250    183200   19.9800  146.6100      15.0        58       977        96
VIS    2025250    183200   19.9700  146.5300      14.7        63       972       100
VIS    2025250    183200   19.9900  146.5100      14.7        70       950        99
VIS    2025250    183200   19.9900  146.4800      15.4        68       929        99
VIS    2025250    183200   19.9700  146.4600      15.5        67       909        95
VIS    2025250    183200   19.9800  146.4500      15.5        68       889        96
VIS    2025250    183200   19.9800  146.4300      15.5        71       814        92
VIS    2025250    183200   20.0200  150.9000       5.7        77       986        94
VIS    2025250    183200   20.0100  150.8800       5.0        70       998        98
VIS    2025250    183200   20.0000  150.8600       4.4        64       965        96
VIS    2025250    183200   19.9900  149.0000       9.3        58       984        94
VIS    2025250    183200   19.9800  148.8100       9.4        51       972        91
VIS    2025250    183200   19.9700  148.8100       9.4        52       952        91
VIS    2025250    183200   19.9900  148.7800       9.9        54       952        92
VIS    2025250    183200   19.9800  148.2400       9.3        64       968        93
VIS    2025250    183200   19.9900  148.2200       9.2        64       968        92
VIS    2025250    183200   19.9800  148.0300      10.2        67       985        92
VIS    2025250    183200   19.9800  148.0100       9.7        67       938        91
VIS    2025250    183200   19.9600  147.9700       9.6        77       904        91
VIS    2025250    183200   19.9800  147.9400      10.4        81       870        97
VIS    2025250    183200   19.9800  147.8600       9.3        98       791        95
VIS    2025250    183200   19.9700  147.8300       8.7        92       726        96
VIS    2025250    183200   19.9600  147.8200       8.6        91       715        96
VIS    2025250    183200   19.9600  147.7900       9.4        90       713        97
VIS    2025250    183200   19.9600  147.7800       9.5        89       712        97
VIS    2025250    183200   19.9600  147.7500       9.2        89       706        97
VIS    2025250    183200   19.9600  147.7300       8.9        85       703        95
VIS    2025250    183200   19.9600  147.5200       9.1        73       736        91
VIS    2025250    183200   19.9700  147.4400       9.6        82       721        91
VIS    2025250    183200   19.9600  147.4100      11.4        83       727        94
VIS    2025250    183200   19.9600  147.3900      12.3        82       727        92
VIS    2025250    183200   19.9800  147.3000      10.6        72       726        90
VIS    2025250    183200   19.9700  147.2600      10.3        80       726        91
VIS    2025250    183200   19.9700  147.2500      10.2        81       726        92
VIS    2025250    183200   19.9600  147.2100       9.7        79       788        95
VIS    2025250    183200   19.9600  147.2000       9.8        79       805        95
VIS    2025250    183200   19.9500  147.1700      10.1        78       787        94
VIS    2025250    183200   19.9600  147.1100      11.3        64       842        95
VIS    2025250    183200   19.9700  147.1100      12.1        64       857        96
VIS    2025250    183200   19.9700  147.0800      11.8        70       869        94
VIS    2025250    183200   19.9700  146.9900      12.4        62       989        97
VIS    2025250    183200   19.9700  146.9800      12.3        59       989       100
VIS    2025250    183200   19.9500  146.8600      16.6        63       993        94
VIS    2025250    183200   19.9500  146.6400      14.5        55       986        99
VIS    2025250    183200   19.9500  146.6300      15.0        55       986        99
VIS    2025250    183200   19.9500  146.5900      15.6        57       970        97
VIS    2025250    183200   19.9600  146.5700      15.2        61       961        97
VIS    2025250    183200   19.9600  146.5500      15.8        63       969        93
VIS    2025250    183200   19.9700  146.5200      14.6        62       972        97
VIS    2025250    183200   19.9700  146.5100      14.4        63       962       100
VIS    2025250    183200   19.9600  146.4800      14.8        66       922        95
VIS    2025250    183200   19.9500  146.4600      14.3        71       859        95
VIS    2025250    183200   19.9600  146.4200      15.1        73       797        92
VIS    2025250    183200   19.9500  146.4100      14.7        74       796        93
VIS    2025250    183200   19.9800  150.9000       4.6        69       998        93
VIS    2025250    183200   19.9800  150.8900       4.7        66       987        94
VIS    2025250    183200   19.9700  150.3000       6.7        75       971        91
VIS    2025250    183200   19.9600  149.0000       9.4        59       987        94
VIS    2025250    183200   19.9600  148.9800       9.2        57       984        95
VIS    2025250    183200   19.9700  148.8000       9.5        52       952        91
VIS    2025250    183200   19.9700  148.7900       9.6        52       948        90
VIS    2025250    183200   19.9400  148.2300       9.6        58       952        94
VIS    2025250    183200   19.9600  148.0300      10.3        67       991        93
VIS    2025250    183200   19.9500  148.0000       9.8        65       938        90
VIS    2025250    183200   19.9400  147.9600       9.0        68       912        94
VIS    2025250    183200   19.9600  147.9600       9.6        76       893        94
VIS    2025250    183200   19.9500  147.9300      10.1        75       893        97
VIS    2025250    183200   19.9500  147.8400       8.2        96       811        93
VIS    2025250    183200   19.9400  147.8200       8.2        94       747        97
VIS    2025250    183200   19.9600  147.8000       9.1        91       715        97
VIS    2025250    183200   19.9600  147.7800       9.5        90       713        97
VIS    2025250    183200   19.9600  147.7500       9.1        89       706        96
VIS    2025250    183200   19.9400  147.7300       8.6        87       706        95
VIS    2025250    183200   19.9300  147.5700       9.5        73       735        91
VIS    2025250    183200   19.9300  147.5500       9.5        75       734        93
VIS    2025250    183200   19.9400  147.5300       9.1        75       734        92
VIS    2025250    183200   19.9300  147.4900       9.4        77       734        94
VIS    2025250    183200   19.9500  147.4900       9.6        76       728        90
VIS    2025250    183200   19.9400  147.4500       9.4        86       720        95
VIS    2025250    183200   19.9500  147.4400       9.5        84       721        93
VIS    2025250    183200   19.9300  147.4000      11.7        75       727        90
VIS    2025250    183200   19.9300  147.2200       9.8        71       805        93
VIS    2025250    183200   19.9300  147.2000       9.8        69       831        95
VIS    2025250    183200   19.9400  147.1800      10.0        71       823        95
VIS    2025250    183200   19.9300  147.1400      10.5        69       826        95
VIS    2025250    183200   19.9300  147.1300      10.3        66       837        95
VIS    2025250    183200   19.9500  147.1100      10.7        65       847        96
VIS    2025250    183200   19.9300  147.0800       9.7        87       804        97
VIS    2025250    183200   19.9500  146.9800      11.5        63       995        93
VIS    2025250    183200   19.9400  146.9600      10.4        74       986        92
VIS    2025250    183200   19.9300  146.8200      17.2        61       989        90
VIS    2025250    183200   19.9200  146.8100      17.5        61       989        90
VIS    2025250    183200   19.9300  146.6800      10.2        78       981        92
VIS    2025250    183200   19.9300  146.6100      15.5        57       970        99
VIS    2025250    183200   19.9300  146.6000      15.6        57       967        98
VIS    2025250    183200   19.9300  146.5600      15.6        55       961        98
VIS    2025250    183200   19.9200  146.5600      15.5        56       961        98
VIS    2025250    183200   19.9200  146.5200      13.0        69       949        92
VIS    2025250    183200   19.9200  146.4900      13.1        72       913        99
VIS    2025250    183200   19.9300  146.4800      13.6        71       901        97
VIS    2025250    183200   19.9400  146.4500      14.1        74       803        94
VIS    2025250    183200   19.9200  146.4200      14.2        72       785        93
VIS    2025250    183200   19.9300  148.8000      10.4        46       948        93
VIS    2025250    183200   19.9200  148.8000      10.3        46       955        93
VIS    2025250    183200   19.9400  148.2300       9.6        59       967        94
VIS    2025250    183200   19.9200  148.2200       9.3        61       983        94
VIS    2025250    183200   19.9100  148.0300      10.5        65       987        97
VIS    2025250    183200   19.9300  148.0000       9.9        63       952        94
VIS    2025250    183200   19.9300  147.9800       9.4        63       934        93
VIS    2025250    183200   19.9300  147.9600       9.0        66       914        94
VIS    2025250    183200   19.9300  147.9400       9.8        72       914        96
VIS    2025250    183200   19.9300  147.9200      10.2        72       902        96
VIS    2025250    183200   19.9300  147.8200       8.2        95       811        94
VIS    2025250    183200   19.9200  147.8200       8.2        94       747        97
VIS    2025250    183200   19.9300  147.7700       9.1        93       713        98
VIS    2025250    183200   19.9100  147.7600       8.9        90       711        97
VIS    2025250    183200   19.9100  147.7400       9.0        91       711        96
VIS    2025250    183200   19.9300  147.7200       8.9        83       707        94
VIS    2025250    183200   19.9200  147.5800       9.2        74       735        90
VIS    2025250    183200   19.9300  147.5700       9.5        74       735        92
VIS    2025250    183200   19.9100  147.5200       9.0        72       749        93
VIS    2025250    183200   19.9200  147.5100       9.1        75       748        94
VIS    2025250    183200   19.9200  147.4900       9.1        76       736        94
VIS    2025250    183200   19.9100  147.4500      10.0        78       722        93
VIS    2025250    183200   19.9200  147.4400       9.7        82       720        95
VIS    2025250    183200   19.9200  147.1900      10.2        65       842        94
VIS    2025250    183200   19.9000  147.1500      10.6        64       893        97
VIS    2025250    183200   19.9100  147.1500      10.8        67       864        97
VIS    2025250    183200   19.9200  147.1000      10.0        79       842        96
VIS    2025250    183200   19.9100  147.0900      10.3        83       824        97
VIS    2025250    183200   19.9000  147.0500      10.8        73       835        95
VIS    2025250    183200   19.9200  147.0200      11.5        64       933        94
VIS    2025250    183200   19.9100  146.8900      10.8        65       996        93
VIS    2025250    183200   19.9100  146.6700      12.3        73       980        96
VIS    2025250    183200   19.9000  146.6300      16.6        56       971        98
VIS    2025250    183200   19.9200  146.6100      15.8        57       970        99
VIS    2025250    183200   19.9100  146.5900      15.5        57       966        98
VIS    2025250    183200   19.9100  146.5500      15.3        56       960        97
VIS    2025250    183200   19.9000  146.5400      14.5        60       936        97
VIS    2025250    183200   19.9100  146.5000      12.8        74       913        99
VIS    2025250    183200   19.9200  146.5000      12.9        73       913        99
VIS    2025250    183200   19.9000  146.4700      14.1        63       824        91
VIS    2025250    183200   19.9000  146.4300      14.8        64       800        90
VIS    2025250    183200   19.9200  148.7900      10.3        46       977        94
VIS    2025250    183200   19.9200  148.7800      10.0        47       955        95
VIS    2025250    183200   19.9000  148.2500       9.2        60       997        90
VIS    2025250    183200   19.9100  148.2200       9.3        61       983        90
VIS    2025250    183200   19.9000  148.0300      10.6        67       987        96
VIS    2025250    183200   19.9100  148.0000      10.5        63       952        96
VIS    2025250    183200   19.9000  147.9800      10.8        61       952        95
VIS    2025250    183200   19.8900  147.9600      11.2        59       960        94
VIS    2025250    183200   19.8900  147.9300      10.8        66       967        96
VIS    2025250    183200   19.8900  147.9200      10.5        70       961        94
VIS    2025250    183200   19.9100  147.8900      10.3        74       961        90
VIS    2025250    183200   19.9000  147.8600       9.8        77       991        90
VIS    2025250    183200   19.8900  147.8000       7.8        83       818        95
VIS    2025250    183200   19.8900  147.7900       7.7        85       818        96
VIS    2025250    183200   19.9000  147.7600       8.7        87       710        97
VIS    2025250    183200   19.9000  147.7300       9.1        87       711        91
VIS    2025250    183200   19.9000  147.5500      10.5        68       738        90
VIS    2025250    183200   19.8800  147.5400      10.8        70       753        92
VIS    2025250    183200   19.8900  147.5000       8.8        70       758        93
VIS    2025250    183200   19.8900  147.4900       8.8        73       752        93
VIS    2025250    183200   19.8800  147.4700       9.3        74       740        92
VIS    2025250    183200   19.8900  147.4500      10.0        74       726        91
VIS    2025250    183200   19.8800  147.2800      10.2        78       732        93
VIS    2025250    183200   19.8800  147.2600      10.6        83       739        95
VIS    2025250    183200   19.9000  147.1900      10.5        62       865        94
VIS    2025250    183200   19.8900  147.1500      11.1        63       902        96
VIS    2025250    183200   19.9000  147.1400      11.4        65       893        97
VIS    2025250    183200   19.8800  147.1200      12.9        65       879        96
VIS    2025250    183200   19.9000  147.0600      10.7        75       819        94
VIS    2025250    183200   19.8900  146.9000      11.0        64       961        94
VIS    2025250    183200   19.8800  146.7800      16.4        60       995        94
VIS    2025250    183200   19.8800  146.6600      16.8        54       981        97
VIS    2025250    183200   19.8800  146.6500      16.7        54       981        97
VIS    2025250    183200   19.8700  146.6200      16.2        59       969        99
VIS    2025250    183200   19.8700  146.6000      15.9        62       969        99
VIS    2025250    183200   19.8900  146.5700      15.4        61       955        99
VIS    2025250    183200   19.8900  146.5400      15.0        59       936        97
VIS    2025250    183200   19.8700  146.5100      14.8        65       887        95
VIS    2025250    183200   19.8900  146.4900      13.5        70       852        97
VIS    2025250    183200   19.8900  146.4700      14.8        64       845        93
VIS    2025250    183200   19.8900  146.4300      15.1        62       824        90
VIS    2025250    183200   19.8800  146.4100      15.0        63       819        90
VIS    2025250    183200   19.9200  152.1000       5.5        86       958        91
VIS    2025250    183200   19.9000  150.7800       6.2        64       985        93
VIS    2025250    183200   19.8900  149.0400       8.9        51       983        93
VIS    2025250    183200   19.9000  149.0300       9.0        53       983        90
VIS    2025250    183200   19.8800  148.2300       9.1        63       975        90
VIS    2025250    183200   19.8900  148.2300       9.1        62       983        92
VIS    2025250    183200   19.8600  148.1600      10.9        43       994        96
VIS    2025250    183200   19.8700  148.1500      11.0        44       994        96
VIS    2025250    183200   19.8800  148.0400      10.1        66       995        93
VIS    2025250    183200   19.8700  148.0200      10.4        63       963        96
VIS    2025250    183200   19.8800  147.9900      10.8        63       960        95
VIS    2025250    183200   19.8800  147.9200      10.7        67       974        95
VIS    2025250    183200   19.8700  147.8500      10.7        70       990        90
VIS    2025250    183200   19.8600  147.8200       8.8        68       991        93
VIS    2025250    183200   19.8700  147.7800       7.9        82       721        97
VIS    2025250    183200   19.8600  147.7800       8.2        81       721        97
VIS    2025250    183200   19.8600  147.7400       9.4        79       710        90
VIS    2025250    183200   19.8600  147.6700       9.6        70       799        93
VIS    2025250    183200   19.8800  147.5400      10.9        70       753        91
VIS    2025250    183200   19.8600  147.5100       9.2        74       749        93
VIS    2025250    183200   19.8600  147.5000       9.1        78       745        94
VIS    2025250    183200   19.8700  147.4700       9.5        74       740        93
VIS    2025250    183200   19.8600  147.3800       9.8        71       729        91
VIS    2025250    183200   19.8700  147.3400       9.8        73       727        90
VIS    2025250    183200   19.8700  147.3300       9.9        73       727        90
VIS    2025250    183200   19.8500  147.3000       9.9        76       726        90
VIS    2025250    183200   19.8700  147.2500      11.0        83       739        92
VIS    2025250    183200   19.8500  147.1900      11.6        60       899        93
VIS    2025250    183200   19.8600  147.1600      11.4        59       924        91
VIS    2025250    183200   19.8700  147.1400      12.4        62       924        93
VIS    2025250    183200   19.8600  147.1300      12.9        61       924        96
VIS    2025250    183200   19.8700  147.0500      11.4        59       871        93
VIS    2025250    183200   19.8500  147.0300      11.9        55       947        96
VIS    2025250    183200   19.8700  146.8000      16.2        60       981        91
VIS    2025250    183200   19.8700  146.7800      16.0        60       995        95
VIS    2025250    183200   19.8500  146.6600      16.5        57       990        96
VIS    2025250    183200   19.8600  146.6500      16.5        56       981        97
VIS    2025250    183200   19.8600  146.6300      16.4        58       975        97
VIS    2025250    183200   19.8600  146.6000      16.0        62       969        99
VIS    2025250    183200   19.8600  146.5800      15.5        63       967        97
VIS    2025250    183200   19.8600  146.5500      15.3        60       937        93
VIS    2025250    183200   19.8600  146.5300      15.6        60       916        94
VIS    2025250    183200   19.8500  146.5100      16.1        61       905        95
VIS    2025250    183200   19.8600  146.4700      16.0        64       889        93
VIS    2025250    183200   19.9000  152.0900       4.9        79       933        95
VIS    2025250    183200   19.9000  152.0700       4.5        73       933        90
VIS    2025250    183200   19.8700  149.0300       9.0        51       980        93
VIS    2025250    183200   19.8500  148.7600       9.5        52       964        93
VIS    2025250    183200   19.8500  148.2100       9.1        61       922        90
VIS    2025250    183200   19.8600  148.2000       9.2        57       987        93
VIS    2025250    183200   19.8600  148.1600      11.0        40       994        96
VIS    2025250    183200   19.8600  148.0300       9.7        64       963        92
VIS    2025250    183200   19.8400  148.0200       9.4        65       956        94
VIS    2025250    183200   19.8400  147.9900       9.7        65       960        96
VIS    2025250    183200   19.8400  147.9600      10.6        54       967        99
VIS    2025250    183200   19.8500  147.9300      10.8        62       975        96
VIS    2025250    183200   19.8500  147.9200      10.8        63       986        95
VIS    2025250    183200   19.8500  147.9000       9.9        72       990        90
VIS    2025250    183200   19.8400  147.8600      10.4        73       973        92
VIS    2025250    183200   19.8600  147.8300       9.7        63       991        97
VIS    2025250    183200   19.8500  147.8200       9.1        66       994        94
VIS    2025250    183200   19.8500  147.7900       8.0        80       743        96
VIS    2025250    183200   19.8500  147.7700       8.6        81       721        96
VIS    2025250    183200   19.8300  147.7000      10.2        67       812        95
VIS    2025250    183200   19.8400  147.6800       9.6        73       812        97
VIS    2025250    183200   19.8300  147.6700       9.7        76       817        99
VIS    2025250    183200   19.8400  147.6300       9.1        74       787        94
VIS    2025250    183200   19.8300  147.5300       9.7        74       730        91
VIS    2025250    183200   19.8400  147.5000       9.4        82       739        96
VIS    2025250    183200   19.8500  147.5000       9.2        80       742        95
VIS    2025250    183200   19.8400  147.4600       9.8        81       739        95
VIS    2025250    183200   19.8400  147.4500       9.6        79       738        92
VIS    2025250    183200   19.8300  147.4000       9.5        75       737        93
VIS    2025250    183200   19.8300  147.3800       9.2        71       732        92
VIS    2025250    183200   19.8300  147.3600       9.5        68       729        90
VIS    2025250    183200   19.8500  147.2100      11.6        63       831        91
VIS    2025250    183200   19.8300  147.1800      12.0        61       919        96
VIS    2025250    183200   19.8300  147.1700      12.2        59       940        97
VIS    2025250    183200   19.8400  147.1400      12.2        60       963        97
VIS    2025250    183200   19.8300  147.0700      11.3        65       844        96
VIS    2025250    183200   19.8300  147.0500      11.4        61       924        96
VIS    2025250    183200   19.8400  147.0300      11.7        57       963        97
VIS    2025250    183200   19.8400  146.9900      10.8        77       964        94
VIS    2025250    183200   19.8300  146.9700      11.3        70       918        96
VIS    2025250    183200   19.8200  146.7600      15.4        59       996        93
VIS    2025250    183200   19.8300  146.6600      15.6        60       969        98
VIS    2025250    183200   19.8400  146.6500      16.1        59       981        98
VIS    2025250    183200   19.8400  146.6100      16.2        59       969        98
VIS    2025250    183200   19.8300  146.5900      15.8        59       967        96
VIS    2025250    183200   19.8400  146.5800      15.4        59       966        93
VIS    2025250    183200   19.8300  146.5400      15.7        60       925        94
VIS    2025250    183200   19.8200  146.5200      16.0        62       918        96
VIS    2025250    183200   19.8400  146.5100      16.3        62       905        95
VIS    2025250    183200   19.8200  146.4700      16.2        64       902        92
VIS    2025250    183200   19.8300  149.1900       8.9        64       993        91
VIS    2025250    183200   19.8300  149.1900       8.9        62       993        94
VIS    2025250    183200   19.8400  149.1600       9.0        54       996        97
VIS    2025250    183200   19.8400  149.0200       8.9        50       977        93
VIS    2025250    183200   19.8400  148.9900       8.9        50       970        91
VIS    2025250    183200   19.8300  148.9600       9.0        52       978        95
VIS    2025250    183200   19.8200  148.2900       9.5        66       955        95
VIS    2025250    183200   19.8300  148.2600       9.2        62       932        92
VIS    2025250    183200   19.8300  148.2400       8.9        62       895        93
VIS    2025250    183200   19.8300  148.2100       8.9        63       909        90
VIS    2025250    183200   19.8200  148.2000       9.1        53       912        94
VIS    2025250    183200   19.8200  148.1800      10.2        44       999        96
VIS    2025250    183200   19.8200  148.1400       9.5        48       974        99
VIS    2025250    183200   19.8100  148.1300       9.1        58       974        99
VIS    2025250    183200   19.8300  148.0500       9.0        72       981        90
VIS    2025250    183200   19.8300  148.0300       9.0        70       963        93
VIS    2025250    183200   19.8200  148.0100       9.5        71       954        94
VIS    2025250    183200   19.8200  147.9700       9.7        60       967        96
VIS    2025250    183200   19.8200  147.9400      10.9        61       973        97
VIS    2025250    183200   19.8300  147.9200      11.2        65       990        96
VIS    2025250    183200   19.8100  147.9000       9.8        74       990        93
VIS    2025250    183200   19.8200  147.8700      10.1        76       980        91
VIS    2025250    183200   19.8300  147.8500      10.7        72       973        92
VIS    2025250    183200   19.8200  147.8300      10.9        61       975        96
VIS    2025250    183200   19.8200  147.7900       9.2        75       882        99
VIS    2025250    183200   19.8300  147.7800       8.7        81       743        97
VIS    2025250    183200   19.8100  147.7600      10.4        78       745        96
VIS    2025250    183200   19.8300  147.7000      10.3        67       812        95
VIS    2025250    183200   19.8300  147.6700      10.0        74       817        98
VIS    2025250    183200   19.8100  147.6500      10.9        73       844        98
VIS    2025250    183200   19.8200  147.6200       8.7        71       802        92
VIS    2025250    183200   19.8100  147.6100       8.5        66       787        91
VIS    2025250    183200   19.8100  147.5200       9.8        81       729        91
VIS    2025250    183200   19.8300  147.5100       9.4        80       729        94
VIS    2025250    183200   19.8200  147.4700      10.2        82       738        96
VIS    2025250    183200   19.8300  147.4600      10.0        81       739        96
VIS    2025250    183200   19.8100  147.4300      10.1        79       737        93
VIS    2025250    183200   19.8200  147.4000       9.5        72       737        91
VIS    2025250    183200   19.8200  147.3700       9.5        69       732        90
VIS    2025250    183200   19.8300  147.3600       9.5        68       730        90
VIS    2025250    183200   19.8100  147.2200      11.5        70       775        93
VIS    2025250    183200   19.8200  147.1900      12.3        62       831        93
VIS    2025250    183200   19.8200  147.1700      12.6        56       940        97
VIS    2025250    183200   19.8200  147.1600      12.5        56       963        98
VIS    2025250    183200   19.8100  147.1200      12.2        65       952        94
VIS    2025250    183200   19.8000  147.1100      12.0        66       911        95
VIS    2025250    183200   19.8000  147.0800      11.2        65       883        97
VIS    2025250    183200   19.8200  147.0500      11.2        63       924        96
VIS    2025250    183200   19.8200  147.0300      10.7        66       957        91
VIS    2025250    183200   19.8100  146.9700      12.2        65       955        98
VIS    2025250    183200   19.8000  146.9600      12.4        62       948        97
VIS    2025250    183200   19.8100  146.9400      11.9        62       965        98
VIS    2025250    183200   19.8100  146.8400      13.4        59       981       100
VIS    2025250    183200   19.8200  146.7500      15.4        59       996        93
VIS    2025250    183200   19.8200  146.7300      15.4        60       996        95
VIS    2025250    183200   19.8000  146.6700      13.4        68       966        92
VIS    2025250    183200   19.8000  146.6700      13.8        67       966        94
VIS    2025250    183200   19.8000  146.6400      15.3        65       966       100
VIS    2025250    183200   19.8000  146.6000      15.3        64       949        97
VIS    2025250    183200   19.8000  146.5900      15.3        62       949        94
VIS    2025250    183200   19.8000  146.5500      15.2        62       930        91
VIS    2025250    183200   19.8000  146.5200      16.1        63       928        97
VIS    2025250    183200   19.8000  146.5100      16.5        64       929        97
VIS    2025250    183200   19.8200  146.4700      16.3        65       907        93
VIS    2025250    183200   19.8200  146.4700      16.2        65       907        93
VIS    2025250    183200   19.8000  146.4400      15.1        70       826        91
VIS    2025250    183200   19.8500  151.9600       4.3        75       978        92
VIS    2025250    183200   19.8200  150.3000       6.0        68       983        97
VIS    2025250    183200   19.8200  150.2600       6.4        71       957        95
VIS    2025250    183200   19.8200  150.2400       6.7        72       951        94
VIS    2025250    183200   19.8000  148.9700       8.7        52       976        96
VIS    2025250    183200   19.8000  148.9500       8.6        52       964        99
VIS    2025250    183200   19.8200  148.7600       9.8        56       985        92
VIS    2025250    183200   19.8100  148.2900       9.6        67       971        95
VIS    2025250    183200   19.8000  148.2700       9.0        64       877        98
VIS    2025250    183200   19.7900  148.2400       8.8        55       874        94
VIS    2025250    183200   19.8000  148.2300       9.0        52       884        94
VIS    2025250    183200   19.8100  148.2000       9.1        52       912        95
VIS    2025250    183200   19.7900  148.1800       9.9        52       963        96
VIS    2025250    183200   19.8000  148.1500       9.6        51       960        98
VIS    2025250    183200   19.8100  148.1300       9.0        56       967        98
VIS    2025250    183200   19.7900  147.9600       9.8        58       972        94
VIS    2025250    183200   19.7900  147.9400      11.5        47       972        96
VIS    2025250    183200   19.8000  147.8300      10.8        62       949        97
VIS    2025250    183200   19.7900  147.8000       9.9        66       921        99
VIS    2025250    183200   19.8100  147.7700       9.7        78       828        98
VIS    2025250    183200   19.8000  147.7500      10.5        74       828        97
VIS    2025250    183200   19.7800  147.7300      10.6        69       825        97
VIS    2025250    183200   19.8000  147.6900      11.3        70       830        97
VIS    2025250    183200   19.8000  147.6700      11.6        72       844        99
VIS    2025250    183200   19.7800  147.6600      12.0        63       871        96
VIS    2025250    183200   19.7900  147.6300      11.0        54       879        91
VIS    2025250    183200   19.7800  147.6000       9.9        51       840        91
VIS    2025250    183200   19.7900  147.4900      10.2        81       728        93
VIS    2025250    183200   19.8000  147.4800      10.3        81       726        94
VIS    2025250    183200   19.7900  147.4600      10.2        79       730        94
VIS    2025250    183200   19.7800  147.4100      10.0        68       741        90
VIS    2025250    183200   19.8000  147.3700       9.4        69       734        90
VIS    2025250    183200   19.7800  147.3400       9.4        73       815        97
VIS    2025250    183200   19.8000  147.3300      10.1        70       751        90
VIS    2025250    183200   19.7900  147.2200      10.8        74       780        95
VIS    2025250    183200   19.7800  147.2000      10.6        63       823        92
VIS    2025250    183200   19.7800  147.1300      12.9        57       973        99
VIS    2025250    183200   19.7900  147.1100      11.8        65       952        99
VIS    2025250    183200   19.7900  146.9900      11.6        65       955        95
VIS    2025250    183200   19.8000  146.9500      12.4        60       965        97
VIS    2025250    183200   19.7900  146.9400      12.0        60       965        98
VIS    2025250    183200   19.7800  146.8900      11.7        62       982        95
VIS    2025250    183200   19.7800  146.8600      12.2        60       981        99
VIS    2025250    183200   19.7800  146.8400      13.2        61       981        98
VIS    2025250    183200   19.7700  146.7400      15.3        68       987        92
VIS    2025250    183200   19.7900  146.7300      15.3        60       998        96
VIS    2025250    183200   19.7900  146.7000      13.6        63       967        90
VIS    2025250    183200   19.7900  146.6700      13.5        68       966        92
VIS    2025250    183200   19.7900  146.6700      13.8        67       937        94
VIS    2025250    183200   19.7900  146.6300      15.3        63       942        98
VIS    2025250    183200   19.7900  146.6000      15.2        65       949        97
VIS    2025250    183200   19.7900  146.5900      15.3        64       949        97
VIS    2025250    183200   19.7800  146.5500      15.9        62       932        94
VIS    2025250    183200   19.7900  146.5200      16.2        62       930        96
VIS    2025250    183200   19.7700  146.5200      16.4        63       930        96
VIS    2025250    183200   19.7900  146.4700      15.6        72       916        96
VIS    2025250    183200   19.7800  146.4500      14.3        75       820        94
VIS    2025250    183200   19.7800  146.4400      14.4        73       809        92
VIS    2025250    183200   19.8100  150.2700       6.1        69       957        96
VIS    2025250    183200   19.8100  150.2400       6.5        72       951        92
VIS    2025250    183200   19.7800  149.1200       9.0        55       965        90
VIS    2025250    183200   19.7800  148.9800       8.9        53       977        91
VIS    2025250    183200   19.7700  148.9200       8.7        54       964        92
VIS    2025250    183200   19.7700  148.7800       8.9        58       961        93
VIS    2025250    183200   19.7700  148.3000      10.6        55       998        92
VIS    2025250    183200   19.7700  148.2600       8.6        64       947        98
VIS    2025250    183200   19.7800  148.2400       8.7        57       884        96
VIS    2025250    183200   19.7900  148.2300       8.9        52       879        93
VIS    2025250    183200   19.7900  148.1900       9.7        52       963        97
VIS    2025250    183200   19.7800  148.1700       9.8        55       963        96
VIS    2025250    183200   19.7700  148.1500       9.7        58       959        99
VIS    2025250    183200   19.7600  148.1100       8.5        66       966        90
VIS    2025250    183200   19.7600  147.9600       9.3        59       959        98
VIS    2025250    183200   19.7600  147.9400      10.9        47       947        97
VIS    2025250    183200   19.7800  147.9300      11.4        47       966        97
VIS    2025250    183200   19.7800  147.9100      10.9        56       990        98
VIS    2025250    183200   19.7800  147.8200      10.7        58       916        97
VIS    2025250    183200   19.7600  147.7900      10.3        59       912        97
VIS    2025250    183200   19.7600  147.7700      10.4        55       921        94
VIS    2025250    183200   19.7600  147.7500      10.9        56       972        92
VIS    2025250    183200   19.7600  147.7200      10.8        61       930        91
VIS    2025250    183200   19.7600  147.6900      11.2        72       861        95
VIS    2025250    183200   19.7600  147.6700      11.2        65       879        95
VIS    2025250    183200   19.7700  147.6600      11.4        63       879        96
VIS    2025250    183200   19.7600  147.6200      11.0        46       899        92
VIS    2025250    183200   19.7600  147.6100      11.0        46       899        92
VIS    2025250    183200   19.7700  147.5000      10.1        79       735        90
VIS    2025250    183200   19.7800  147.4800       9.9        79       729        91
VIS    2025250    183200   19.7800  147.4500      10.1        76       730        92
VIS    2025250    183200   19.7700  147.4300      10.2        72       738        91
VIS    2025250    183200   19.7800  147.3400       9.4        71       815        97
VIS    2025250    183200   19.7800  147.3400       9.4        70       819        96
VIS    2025250    183200   19.7600  147.3100       9.5        60       856        94
VIS    2025250    183200   19.7600  147.2200       9.6        70       787        92
VIS    2025250    183200   19.7700  147.2100       9.8        68       789        91
VIS    2025250    183200   19.7600  147.1700      11.7        51       950        96
VIS    2025250    183200   19.7700  147.1600      11.9        52       954        96
VIS    2025250    183200   19.7700  147.1300      12.7        58       972       100
VIS    2025250    183200   19.7600  147.1100      11.4        69       950        94
VIS    2025250    183200   19.7600  146.9700      13.2        58       963        93
VIS    2025250    183200   19.7600  146.9500      12.3        57       965        97
VIS    2025250    183200   19.7700  146.8800      12.3        60       982        97
VIS    2025250    183200   19.7700  146.8600      12.2        59       982        99
VIS    2025250    183200   19.7700  146.7400      15.4        67       987        97
VIS    2025250    183200   19.7600  146.7100      15.3        64       960        98
VIS    2025250    183200   19.7600  146.6800      15.4        61       956        97
VIS    2025250    183200   19.7500  146.6500      15.6        55       960        96
VIS    2025250    183200   19.7500  146.6300      15.6        56       955        97
VIS    2025250    183200   19.7500  146.6000      15.7        60       950        98
VIS    2025250    183200   19.7600  146.5800      16.2        61       954        97
VIS    2025250    183200   19.7500  146.5500      17.9        54       945        93
VIS    2025250    183200   19.7500  146.5400      17.6        55       945        93
VIS    2025250    183200   19.7500  146.5100      16.3        64       928        98
VIS    2025250    183200   19.7700  146.4900      15.5        72       928        99
VIS    2025250    183200   19.7600  146.4600      13.6        79       820        99
VIS    2025250    183200   19.7500  148.9400       8.7        53       969        96
VIS    2025250    183200   19.7600  148.9300       8.7        56       964        90
VIS    2025250    183200   19.7500  148.9000       8.9        53       980        95
VIS    2025250    183200   19.7500  148.8600       8.9        52       996        92
VIS    2025250    183200   19.7500  148.8300       9.2        59       978        93
VIS    2025250    183200   19.7600  148.8100       9.1        62       961        95
VIS    2025250    183200   19.7700  148.7800       8.9        59       961        93
VIS    2025250    183200   19.7400  148.2900       9.3        54       962        99
VIS    2025250    183200   19.7400  148.2700       8.6        57       962        99
VIS    2025250    183200   19.7400  148.2200       9.2        51       912        98
VIS    2025250    183200   19.7500  148.2100      10.1        55       970        94
VIS    2025250    183200   19.7600  148.1900      10.3        56       970        94
VIS    2025250    183200   19.7400  148.1500      10.1        59       956        96
VIS    2025250    183200   19.7500  148.1400      10.0        61       959        99
VIS    2025250    183200   19.7400  148.0500      11.2        47       986        91
VIS    2025250    183200   19.7500  148.0400      11.1        48       982        93
VIS    2025250    183200   19.7600  147.9600       9.5        53       959        99
VIS    2025250    183200   19.7400  147.9400      10.5        51       967       100
VIS    2025250    183200   19.7600  147.9200      11.5        48       967        97
VIS    2025250    183200   19.7400  147.8800      10.3        56       977        96
VIS    2025250    183200   19.7400  147.8200      11.0        60       903        98
VIS    2025250    183200   19.7400  147.8100      10.9        61       903        98
VIS    2025250    183200   19.7600  147.7900      10.2        57       912        97
VIS    2025250    183200   19.7600  147.7600      10.8        53       938        91
VIS    2025250    183200   19.7500  147.7200      10.9        60       944        92
VIS    2025250    183200   19.7400  147.7200      11.0        62       944        96
VIS    2025250    183200   19.7500  147.6800      11.4        72       879        96
VIS    2025250    183200   19.7400  147.6500      10.7        51       888        93
VIS    2025250    183200   19.7500  147.6300      11.0        50       892        93
VIS    2025250    183200   19.7500  147.6100      10.9        46       899        92
VIS    2025250    183200   19.7300  147.5900      10.9        51       889        93
VIS    2025250    183200   19.7400  147.5700      10.5        56       881        91
VIS    2025250    183200   19.7300  147.4900       9.3        67       742        91
VIS    2025250    183200   19.7500  147.4600       9.5        76       736        97
VIS    2025250    183200   19.7500  147.4300      10.0        73       736        94
VIS    2025250    183200   19.7400  147.4200      10.0        72       736        93
VIS    2025250    183200   19.7400  147.3800      10.6        59       773        92
VIS    2025250    183200   19.7400  147.3700      10.8        58       805        93
VIS    2025250    183200   19.7500  147.3500      10.7        58       842        97
VIS    2025250    183200   19.7300  147.3100      11.1        57       878        97
VIS    2025250    183200   19.7300  147.2900      11.0        55       878        96
VIS    2025250    183200   19.7400  147.2700       9.7        69       820        93
VIS    2025250    183200   19.7500  147.2500       9.5        72       787        91
VIS    2025250    183200   19.7300  147.2000      10.9        52       815        91
VIS    2025250    183200   19.7300  147.1900      11.6        51       897        95
VIS    2025250    183200   19.7300  147.1600      12.6        53       965        99
VIS    2025250    183200   19.7500  147.1400      12.2        57       969        99
VIS    2025250    183200   19.7500  146.9600      13.1        60       989        91
VIS    2025250    183200   19.7400  146.7500      14.2        72       978        97
VIS    2025250    183200   19.7200  146.7300      13.4        71       876        97
VIS    2025250    183200   19.7300  146.6900      15.3        60       947        97
VIS    2025250    183200   19.7300  146.6700      15.3        56       956        96
VIS    2025250    183200   19.7200  146.6400      15.4        57       972        99
VIS    2025250    183200   19.7200  146.6200      15.4        59       955        98
VIS    2025250    183200   19.7200  146.5900      16.1        58       955        99
VIS    2025250    183200   19.7200  146.5600      17.2        56       990        98
VIS    2025250    183200   19.7200  146.5500      17.2        56       950        98
VIS    2025250    183200   19.7200  146.5100      16.0        62       928        98
VIS    2025250    183200   19.7300  146.5000      15.2        66       907        99
VIS    2025250    183200   19.7300  146.4600      13.2        73       820       100
VIS    2025250    183200   19.7400  146.4400      14.0        74       758        92
VIS    2025250    183200   19.7300  146.4300      14.2        72       751        97
VIS    2025250    183200   19.7700  152.0200       4.7        79       991        92
VIS    2025250    183200   19.7300  149.0000       9.0        47       990        92
VIS    2025250    183200   19.7200  148.9400       9.3        55       976        91
VIS    2025250    183200   19.7200  148.9100       9.2        50       976        95
VIS    2025250    183200   19.7300  148.8700       9.1        49       978        90
VIS    2025250    183200   19.7400  148.8600       9.0        52       978        91
VIS    2025250    183200   19.7200  148.8200       9.1        61       952        90
VIS    2025250    183200   19.7400  148.8000       9.2        63       952        90
VIS    2025250    183200   19.7200  148.2800       9.5        54       985        99
VIS    2025250    183200   19.7300  148.2700       8.9        52       962        99
VIS    2025250    183200   19.7300  148.2100      10.4        52       970        96
VIS    2025250    183200   19.7200  148.1800      10.8        54       971        97
VIS    2025250    183200   19.7300  148.1400      10.0        75       948        90
VIS    2025250    183200   19.7200  148.1000       9.6        64       954        91
VIS    2025250    183200   19.7200  148.0600      10.5        44       993        98
VIS    2025250    183200   19.7200  148.0500      10.2        43       993        98
VIS    2025250    183200   19.7100  148.0300      10.4        50       968        99
VIS    2025250    183200   19.7100  147.9600      10.2        54       996        97
VIS    2025250    183200   19.7300  147.9400      10.5        52       967        99
VIS    2025250    183200   19.7100  147.9200      11.1        47       975        99
VIS    2025250    183200   19.7100  147.9000      10.8        47       967        99
VIS    2025250    183200   19.7300  147.8600      10.5        56       959        94
VIS    2025250    183200   19.7200  147.8400      10.5        59       932        97
VIS    2025250    183200   19.7200  147.8200      10.1        62       903        95
VIS    2025250    183200   19.7100  147.8000      10.3        56       897        92
VIS    2025250    183200   19.7100  147.7700      11.5        47       912        96
VIS    2025250    183200   19.7300  147.7400      11.6        51       972        96
VIS    2025250    183200   19.7200  147.7300      11.2        57       972        94
VIS    2025250    183200   19.7200  147.7000      10.8        65       959        92
VIS    2025250    183200   19.7200  147.6700      11.7        59       915        97
VIS    2025250    183200   19.7100  147.6500      11.3        51       901        94
VIS    2025250    183200   19.7300  147.6100      10.9        48       899        95
VIS    2025250    183200   19.7300  147.6000      11.0        49       899        93
VIS    2025250    183200   19.7200  147.5700      10.7        54       881        94
VIS    2025250    183200   19.7100  147.4700      10.0        68       739        93
VIS    2025250    183200   19.7100  147.4400      10.0        77       732        98
VIS    2025250    183200   19.7100  147.4200       9.9        76       732        96
VIS    2025250    183200   19.7200  147.4000      10.2        70       736        90
VIS    2025250    183200   19.7300  147.3600      10.9        58       829        96
VIS    2025250    183200   19.7200  147.3600      10.8        59       836        97
VIS    2025250    183200   19.7200  147.3300      11.2        62       861        99
VIS    2025250    183200   19.7300  147.3000      11.3        58       878        98
VIS    2025250    183200   19.7100  147.2600      10.4        67       874        96
VIS    2025250    183200   19.7200  147.2600      10.1        69       856        96
VIS    2025250    183200   19.7100  147.2100      10.8        57       807        92
VIS    2025250    183200   19.7200  147.2000      11.6        52       865        94
VIS    2025250    183200   19.7100  147.1700      12.6        54       960        99
VIS    2025250    183200   19.7200  147.1600      12.7        54       965        99
VIS    2025250    183200   19.7200  147.1200      11.4        67       966        91
VIS    2025250    183200   19.7200  147.1100      11.1        68       966        90
VIS    2025250    183200   19.7100  147.0200      14.6        58       990        97
VIS    2025250    183200   19.7100  146.8300      14.2        56       996        99
VIS    2025250    183200   19.7200  146.7200      13.4        70       876        97
VIS    2025250    183200   19.7100  146.7100      13.4        69       868        97
VIS    2025250    183200   19.7000  146.6700      14.9        57       963        99
VIS    2025250    183200   19.7000  146.6400      15.4        58       983       100
VIS    2025250    183200   19.7200  146.6400      15.4        59       963        99
VIS    2025250    183200   19.7000  146.6100      15.5        62       955        99
VIS    2025250    183200   19.7200  146.5900      16.1        58       955        99
VIS    2025250    183200   19.7100  146.5500      16.8        57       945        98
VIS    2025250    183200   19.7000  146.5300      15.5        60       941        97
VIS    2025250    183200   19.7200  146.5200      16.1        61       928        97
VIS    2025250    183200   19.7200  146.4900      14.8        66       891        98
VIS    2025250    183200   19.7200  146.4500      13.5        74       753        98
VIS    2025250    183200   19.7000  146.4300      14.3        73       747        97
VIS    2025250    183200   19.7400  152.0400       5.4        53       979        98
VIS    2025250    183200   19.7500  152.0100       4.8        69       933        96
VIS    2025250    183200   19.7200  148.9900       9.1        48       996        92
VIS    2025250    183200   19.7100  148.9600       9.6        55       996        91
VIS    2025250    183200   19.7200  148.9400       9.4        55       980        91
VIS    2025250    183200   19.7100  148.9100       9.2        51       975        94
VIS    2025250    183200   19.7100  148.9000       9.2        50       969        94
VIS    2025250    183200   19.7000  148.8200       9.1        58       945        91
VIS    2025250    183200   19.7100  148.2900       9.7        53       985        98
VIS    2025250    183200   19.7100  148.2800       9.6        55       985        98
VIS    2025250    183200   19.7000  148.1900      11.1        47       997        98
VIS    2025250    183200   19.7000  148.1700      10.6        53       971        98
VIS    2025250    183200   19.6900  148.1600       9.8        60       959        96
VIS    2025250    183200   19.7100  148.0600      10.1        48       993        98
VIS    2025250    183200   19.7100  148.0500       9.6        44       981        99
VIS    2025250    183200   19.6900  148.0300       8.5        68       975        92
VIS    2025250    183200   19.7000  148.0100      10.4        62       968        94
VIS    2025250    183200   19.7000  147.9800      11.2        60       978        93
VIS    2025250    183200   19.7000  147.9400      10.7        48       977        98
VIS    2025250    183200   19.7100  147.9100      11.0        46       975        99
VIS    2025250    183200   19.7000  147.9100      11.2        46       960        99
VIS    2025250    183200   19.6900  147.8700      10.8        49       952        96
VIS    2025250    183200   19.7000  147.8600      10.5        53       944        97
VIS    2025250    183200   19.7000  147.7800      10.8        49       897        94
VIS    2025250    183200   19.7000  147.7400      10.4        57       940        97
VIS    2025250    183200   19.6900  147.7300      10.5        61       958        94
VIS    2025250    183200   19.6800  147.7000      10.9        54       977        96
VIS    2025250    183200   19.6900  147.6700      11.8        47       917        96
VIS    2025250    183200   19.7000  147.6500      11.4        50       904        96
VIS    2025250    183200   19.7000  147.6300      11.0        52       895        97
VIS    2025250    183200   19.6900  147.5900      11.1        64       886        91
VIS    2025250    183200   19.6800  147.5300       9.9        73       751        93
VIS    2025250    183200   19.7000  147.4700      10.1        67       739        93
VIS    2025250    183200   19.7000  147.4600      10.2        71       739        95
VIS    2025250    183200   19.6900  147.4200      10.3        76       732        97
VIS    2025250    183200   19.6800  147.3900      10.3        74       758        97
VIS    2025250    183200   19.6900  147.3700      10.2        69       816        98
VIS    2025250    183200   19.6800  147.3500      10.2        66       848        99
VIS    2025250    183200   19.6800  147.3300      10.4        72       852        98
VIS    2025250    183200   19.7000  147.3000      11.3        69       856        98
VIS    2025250    183200   19.6800  147.2700      11.4        63       856        97
VIS    2025250    183200   19.6900  147.2600      11.0        64       856        98
VIS    2025250    183200   19.6900  147.2300      11.3        59       816        91
VIS    2025250    183200   19.6800  147.1900      12.5        54       911        95
VIS    2025250    183200   19.6800  147.1900      12.7        54       950        97
VIS    2025250    183200   19.6800  147.1400      13.0        59       965        98
VIS    2025250    183200   19.6800  147.1400      12.8        61       965        98
VIS    2025250    183200   19.7000  147.0400      12.9        60       990        93
VIS    2025250    183200   19.6800  146.8600      14.1        57       989        95
VIS    2025250    183200   19.7000  146.8300      13.7        58       996        99
VIS    2025250    183200   19.6800  146.8000      14.7        56       988        99
VIS    2025250    183200   19.6800  146.7700      15.2        54       885        96
VIS    2025250    183200   19.6700  146.7600      15.1        56       857        94
VIS    2025250    183200   19.6900  146.7400      13.0        64       854        95
VIS    2025250    183200   19.6700  146.7200      13.9        65       848        94
VIS    2025250    183200   19.6700  146.6700      15.5        57       943        97
VIS    2025250    183200   19.6900  146.6600      15.4        57       963        99
VIS    2025250    183200   19.6700  146.6400      15.8        59       880        97
VIS    2025250    183200   19.6700  146.5800      15.8        57       977       100
VIS    2025250    183200   19.6700  146.5500      15.4        58       976       100
VIS    2025250    183200   19.6900  146.5400      15.1        61       959        99
VIS    2025250    183200   19.6900  146.5200      14.9        62       941        94
VIS    2025250    183200   19.6900  146.4800      14.2        69       802        92
VIS    2025250    183200   19.6700  146.4500      15.2        75       747        96
VIS    2025250    183200   19.6700  146.4400      15.3        73       746        95
VIS    2025250    183200   19.6700  148.9800       9.8        51       996        91
VIS    2025250    183200   19.6800  148.9500       9.8        56       976        90
VIS    2025250    183200   19.6700  148.9400       9.6        55       972        93
VIS    2025250    183200   19.6700  148.9200       9.0        51       971        96
VIS    2025250    183200   19.6700  148.8900       8.5        50       954        94
VIS    2025250    183200   19.6900  148.1900      10.8        49       997        98
VIS    2025250    183200   19.6800  148.1700       8.9        60       981        92
VIS    2025250    183200   19.6700  148.1500       9.3        67       948        93
VIS    2025250    183200   19.6800  148.0700      10.2        59       993        94
VIS    2025250    183200   19.6700  148.0500       8.9        58       996        96
VIS    2025250    183200   19.6700  148.0200       9.0        66       978        93
VIS    2025250    183200   19.6700  148.0000      10.2        60       975        95
VIS    2025250    183200   19.6600  147.9800      10.6        53       975        97
VIS    2025250    183200   19.6600  147.9400      10.9        51       960        97
VIS    2025250    183200   19.6800  147.9100      11.4        46       960        99
VIS    2025250    183200   19.6800  147.8900      11.2        46       952        98
VIS    2025250    183200   19.6600  147.8700      11.1        47       946        97
VIS    2025250    183200   19.6800  147.8500      10.4        51       923        98
VIS    2025250    183200   19.6700  147.8200       8.7        59       897        96
VIS    2025250    183200   19.6800  147.8100       8.5        62       896        91
VIS    2025250    183200   19.6700  147.7700      10.0        61       893        95
VIS    2025250    183200   19.6700  147.7400      11.1        53       932        94
VIS    2025250    183200   19.6800  147.7300      10.8        56       940        95
VIS    2025250    183200   19.6600  147.7100      11.7        46       976        99
VIS    2025250    183200   19.6600  147.6600      11.8        42       904        94
VIS    2025250    183200   19.6700  147.6400      11.4        50       895        97
VIS    2025250    183200   19.6600  147.6200      10.9        57       892        99
VIS    2025250    183200   19.6800  147.5200       9.8        74       744        94
VIS    2025250    183200   19.6600  147.5000       8.9        70       741        90
VIS    2025250    183200   19.6600  147.4800       9.3        66       744        93
VIS    2025250    183200   19.6700  147.4400      10.2        72       739        97
VIS    2025250    183200   19.6600  147.4300      10.3        71       742        96
VIS    2025250    183200   19.6700  147.3900      10.4        72       763        97
VIS    2025250    183200   19.6600  147.3800      10.4        70       776        96
VIS    2025250    183200   19.6800  147.3500      10.3        65       848        99
VIS    2025250    183200   19.6800  147.3300      10.3        71       848        98
VIS    2025250    183200   19.6800  147.3000      10.9        72       845        95
VIS    2025250    183200   19.6700  147.2300      12.2        55       816        90
VIS    2025250    183200   19.6700  147.1900      12.5        54       950        96
VIS    2025250    183200   19.6600  147.1700      13.0        55       965        98
VIS    2025250    183200   19.6700  147.1600      13.5        56       965        99
VIS    2025250    183200   19.6700  147.1400      12.6        61       957        97
VIS    2025250    183200   19.6600  147.0700      12.0        58       905        92
VIS    2025250    183200   19.6500  147.0400      12.2        57       932        93
VIS    2025250    183200   19.6600  147.0400      12.4        56       944        94
VIS    2025250    183200   19.6700  146.9300      12.4        73       991        90
VIS    2025250    183200   19.6600  146.9100      10.9        70       977        91
VIS    2025250    183200   19.6700  146.8400      14.4        58       989        91
VIS    2025250    183200   19.6600  146.8300      13.4        63       988        95
VIS    2025250    183200   19.6700  146.8000      13.8        60       953        98
VIS    2025250    183200   19.6600  146.7700      14.6        57       887        97
VIS    2025250    183200   19.6700  146.7600      15.0        56       884        97
VIS    2025250    183200   19.6500  146.7300      15.2        57       884        96
VIS    2025250    183200   19.6700  146.7200      14.0        64       857        96
VIS    2025250    183200   19.6600  146.6800      15.8        57       943        96
VIS    2025250    183200   19.6700  146.6700      15.8        56       883        95
VIS    2025250    183200   19.6500  146.6300      15.6        58       943        95
VIS    2025250    183200   19.6700  146.6000      15.8        60       980       100
VIS    2025250    183200   19.6600  146.5800      16.0        56       980       100
VIS    2025250    183200   19.6600  146.5500      15.7        56       976        98
VIS    2025250    183200   19.6700  146.5300      14.8        58       959        96
VIS    2025250    183200   19.6700  146.5000      13.8        76       823        92
VIS    2025250    183200   19.6700  146.4900      13.9        79       802        94
VIS    2025250    183200   19.6600  149.0100       9.5        43       998        97
VIS    2025250    183200   19.6500  148.9900       9.8        46       991        96
VIS    2025250    183200   19.6600  148.9800       9.7        49       996        93
VIS    2025250    183200   19.6500  148.9400       9.0        52       958        97
VIS    2025250    183200   19.6500  148.9200       8.7        52       954        93
VIS    2025250    183200   19.6500  148.9000       8.5        51       952        90
VIS    2025250    183200   19.6600  148.8800       8.3        50       942        94
VIS    2025250    183200   19.6500  148.8500       9.2        53       923        96
VIS    2025250    183200   19.6600  148.1900      10.1        61       983        90
VIS    2025250    183200   19.6400  148.1700       8.2        63       983        90
VIS    2025250    183200   19.6500  148.0300       8.7        62       996        94
VIS    2025250    183200   19.6400  147.9900       9.9        51       972        98
VIS    2025250    183200   19.6400  147.9800      10.0        49       972        99
VIS    2025250    183200   19.6400  147.9500      10.3        51       950        98
VIS    2025250    183200   19.6500  147.9200      10.9        48       952        97
VIS    2025250    183200   19.6500  147.9000      11.2        44       950        97
VIS    2025250    183200   19.6500  147.8900      11.3        45       950        97
VIS    2025250    183200   19.6400  147.8500      10.3        61       908        97
VIS    2025250    183200   19.6400  147.8300       9.8        61       897        98
VIS    2025250    183200   19.6400  147.8000      10.5        53       875        97
VIS    2025250    183200   19.6400  147.7700      11.1        54       876        95
VIS    2025250    183200   19.6400  147.7600      11.1        55       900        96
VIS    2025250    183200   19.6400  147.7200      12.4        43       939        96
VIS    2025250    183200   19.6400  147.7100      12.4        43       939        96
VIS    2025250    183200   19.6500  147.6800      11.9        41       922        93
VIS    2025250    183200   19.6400  147.6500      11.5        49       895        97
VIS    2025250    183200   19.6400  147.6300      10.9        57       892        98
VIS    2025250    183200   19.6300  147.6100      10.9        62       889        98
VIS    2025250    183200   19.6500  147.5800      11.0        73       858        91
VIS    2025250    183200   19.6500  147.5400       9.4        80       751        98
VIS    2025250    183200   19.6400  147.5200       8.8        83       748        97
VIS    2025250    183200   19.6500  147.5100       8.9        78       744        93
VIS    2025250    183200   19.6500  147.4700       9.5        64       746        92
VIS    2025250    183200   19.6500  147.4600       9.8        64       751        93
VIS    2025250    183200   19.6300  147.4300      10.8        69       767        96
VIS    2025250    183200   19.6400  147.4000      10.8        71       776        97
VIS    2025250    183200   19.6500  147.3700      10.6        66       791        92
VIS    2025250    183200   19.6400  147.3500      10.6        63       832        91
VIS    2025250    183200   19.6400  147.3200      10.1        66       832        96
VIS    2025250    183200   19.6400  147.3100      10.0        68       819        95
VIS    2025250    183200   19.6300  147.1900      12.6        53       937        98
VIS    2025250    183200   19.6400  147.1700      12.6        56       973        98
VIS    2025250    183200   19.6400  147.1600      12.3        59       957        97
VIS    2025250    183200   19.6400  147.0400      11.7        58       859        90
VIS    2025250    183200   19.6300  146.9000      10.6        77       902        92
VIS    2025250    183200   19.6300  146.8600      12.4        68       905        94
VIS    2025250    183200   19.6400  146.8300      12.8        66       937        97
VIS    2025250    183200   19.6300  146.8000      11.9        70       860        96
VIS    2025250    183200   19.6400  146.7700      13.4        60       885        97
VIS    2025250    183200   19.6300  146.7500      15.0        56       895        97
VIS    2025250    183200   19.6300  146.7200      16.1        56       915        95
VIS    2025250    183200   19.6300  146.7200      16.3        56       915        95
VIS    2025250    183200   19.6300  146.6800      16.7        55       837        91
VIS    2025250    183200   19.6400  146.6300      15.7        54       943        92
VIS    2025250    183200   19.6400  146.6000      16.2        54       980        96
VIS    2025250    183200   19.6400  146.6000      16.2        55       980        97
VIS    2025250    183200   19.6300  146.5600      16.8        55       967        98
VIS    2025250    183200   19.6200  146.5300      15.6        60       926        96
VIS    2025250    183200   19.6200  146.5100      14.9        68       825        95
VIS    2025250    183200   19.6300  146.4800      15.0        78       779        96
VIS    2025250    183200   19.6300  146.4700      15.0        78       779        96
VIS    2025250    183200   19.6500  149.0300       9.4        43       998        97
VIS    2025250    183200   19.6400  149.0100       9.7        45       991        96
VIS    2025250    183200   19.6400  148.9800       9.6        46       989        96
VIS    2025250    183200   19.6300  148.9500       8.4        48       956        99
VIS    2025250    183200   19.6200  148.9400       8.3        48       956        99
VIS    2025250    183200   19.6400  148.9000       8.5        53       927        91
VIS    2025250    183200   19.6300  148.8900       8.4        54       924        92
VIS    2025250    183200   19.6400  148.8500       9.3        51       923        98
VIS    2025250    183200   19.6300  148.1700       9.0        60       982        93
VIS    2025250    183200   19.6200  148.1200       9.0        69       934        90
VIS    2025250    183200   19.6200  148.0300       9.1        56       982        95
VIS    2025250    183200   19.6300  148.0000       9.8        49       972        99
VIS    2025250    183200   19.6200  147.9800       9.7        48       965        99
VIS    2025250    183200   19.6100  147.9500      10.2        48       917        98
VIS    2025250    183200   19.6100  147.9400      10.4        48       917        98
VIS    2025250    183200   19.6200  147.9100      10.4        44       946        96
VIS    2025250    183200   19.6200  147.8700      10.1        58       932        98
VIS    2025250    183200   19.6300  147.8400      10.0        64       903        98
VIS    2025250    183200   19.6200  147.8400       9.7        71       899        96
VIS    2025250    183200   19.6200  147.8000      11.0        51       879        97
VIS    2025250    183200   19.6200  147.7700      12.5        46       876        92
VIS    2025250    183200   19.6300  147.7600      11.5        53       900        95
VIS    2025250    183200   19.6100  147.7300      11.9        47       920        94
VIS    2025250    183200   19.6300  147.7000      12.1        42       939        96
VIS    2025250    183200   19.6200  147.6800      11.7        44       923        95
VIS    2025250    183200   19.6300  147.6500      11.5        50       904        97
VIS    2025250    183200   19.6200  147.6200      11.1        54       892        97
VIS    2025250    183200   19.6200  147.6100      11.0        55       891        97
VIS    2025250    183200   19.6100  147.5800      10.7        60       885        96
VIS    2025250    183200   19.6100  147.5500      10.6        61       857        98
VIS    2025250    183200   19.6200  147.5300       8.8        79       774        97
VIS    2025250    183200   19.6100  147.5000       8.7        70       748        93
VIS    2025250    183200   19.6100  147.4400      11.3        60       816        93
VIS    2025250    183200   19.6200  147.4200      11.2        71       802        98
VIS    2025250    183200   19.6200  147.4100      11.1        73       788        97
VIS    2025250    183200   19.6200  147.3900      11.2        72       780        92
VIS    2025250    183200   19.6100  147.3400      10.7        67       854        92
VIS    2025250    183200   19.6100  147.3100      10.3        65       819        97
VIS    2025250    183200   19.6200  147.2900      10.3        64       811        90
VIS    2025250    183200   19.6100  147.2400      10.7        61       902        90
VIS    2025250    183200   19.6100  147.2000      12.6        55       984        99
VIS    2025250    183200   19.6000  147.1800      12.7        56       984        99
VIS    2025250    183200   19.6000  147.1700      12.4        58       930        98
VIS    2025250    183200   19.6000  147.1300      10.8        67       845        92
VIS    2025250    183200   19.6100  147.0500      11.2        67       770        95
VIS    2025250    183200   19.6000  147.0300      11.1        71       758        96
VIS    2025250    183200   19.6200  146.8500      11.6        70       902        94
VIS    2025250    183200   19.6100  146.8200      10.6        74       844        96
VIS    2025250    183200   19.6200  146.7900      11.7        66       860        95
VIS    2025250    183200   19.6100  146.7500      14.6        55       921        92
VIS    2025250    183200   19.6200  146.7300      16.1        55       915        95
VIS    2025250    183200   19.6000  146.7000      16.1        57       882        92
VIS    2025250    183200   19.6100  146.7000      16.6        56       882        93
VIS    2025250    183200   19.6200  146.6300      16.2        51       943        94
VIS    2025250    183200   19.6000  146.6200      16.2        53       961        97
VIS    2025250    183200   19.6000  146.5800      15.8        57       961        97
VIS    2025250    183200   19.6200  146.5500      16.6        55       964        98
VIS    2025250    183200   19.6100  146.5300      15.3        57       903        95
VIS    2025250    183200   19.6200  146.5100      15.2        65       825        95
VIS    2025250    183200   19.6100  146.5000      14.8        69       781        93
VIS    2025250    183200   19.6100  149.0400      10.0        50      1000        94
VIS    2025250    183200   19.6100  149.0000      10.0        48       989        93
VIS    2025250    183200   19.6000  148.9700       9.5        48       973        96
VIS    2025250    183200   19.6000  148.9400       8.6        47       929        98
VIS    2025250    183200   19.6000  148.9300       8.4        47       924        98
VIS    2025250    183200   19.6000  148.8900       8.2        50       924        98
VIS    2025250    183200   19.6000  148.8700       8.4        53       914        97
VIS    2025250    183200   19.6100  148.8400       8.8        50       923        97
VIS    2025250    183200   19.6000  148.1600      10.3        62       982        94
VIS    2025250    183200   19.6100  148.1500       9.7        62       975        93
VIS    2025250    183200   19.5900  148.1300       9.8        58       959        96
VIS    2025250    183200   19.5900  148.0400      10.2        60       990        93
VIS    2025250    183200   19.5900  148.0300      10.3        57       982        95
VIS    2025250    183200   19.6100  147.9900       9.7        51       969        98
VIS    2025250    183200   19.5900  147.9700      10.2        50       910        96
VIS    2025250    183200   19.5900  147.9400      11.1        44       903        94
VIS    2025250    183200   19.5900  147.9300      11.3        45       903        94
VIS    2025250    183200   19.6000  147.8900      11.0        48       921        99
VIS    2025250    183200   19.6000  147.8900      10.8        50       932        99
VIS    2025250    183200   19.5900  147.8500      10.2        62       928        95
VIS    2025250    183200   19.6000  147.8400       9.7        74       899        95
VIS    2025250    183200   19.6000  147.8000      10.9        55       879        98
VIS    2025250    183200   19.6100  147.7700      13.0        44       886        91
VIS    2025250    183200   19.6100  147.7600      13.0        46       887        91
VIS    2025250    183200   19.5900  147.7200      12.3        47       918        96
VIS    2025250    183200   19.5800  147.7000      11.7        44       927        94
VIS    2025250    183200   19.5900  147.6800      11.0        47       923        93
VIS    2025250    183200   19.5800  147.6500      11.4        49       904        94
VIS    2025250    183200   19.5900  147.6400      11.7        48       898        95
VIS    2025250    183200   19.5800  147.6100      10.9        53       885        97
VIS    2025250    183200   19.6000  147.5800      10.7        59       875        97
VIS    2025250    183200   19.5900  147.5400      11.4        58       857        98
VIS    2025250    183200   19.5900  147.5400      11.5        54       857        96
VIS    2025250    183200   19.6000  147.5100       9.4        64       776        93
VIS    2025250    183200   19.5900  147.4500      11.1        58       818        90
VIS    2025250    183200   19.5900  147.4300      11.3        64       822        96
VIS    2025250    183200   19.5800  147.4100      10.8        75       806        98
VIS    2025250    183200   19.6000  147.3800      11.2        75       780        96
VIS    2025250    183200   19.5800  147.3400      11.0        66       866        99
VIS    2025250    183200   19.5800  147.3300      10.8        66       867        98
VIS    2025250    183200   19.6000  147.3000      10.6        65       801        96
VIS    2025250    183200   19.5800  147.2700      10.7        68       789        92
VIS    2025250    183200   19.5800  147.2300      10.5        72       902        90
VIS    2025250    183200   19.5900  147.2000      12.5        55       984        99
VIS    2025250    183200   19.5800  147.1900      12.7        54       984        98
VIS    2025250    183200   19.5900  147.1500      11.8        60       870        96
VIS    2025250    183200   19.6000  147.1300      10.9        66       845        93
VIS    2025250    183200   19.5800  147.0600      11.7        78       747        99
VIS    2025250    183200   19.6000  147.0300      11.1        73       758        98
VIS    2025250    183200   19.5800  147.0200      11.3        75       743        97
VIS    2025250    183200   19.6000  146.9500      11.2        63       969        93
VIS    2025250    183200   19.5800  146.8300      10.3        75       833        90
VIS    2025250    183200   19.6000  146.8100      10.4        73       844        95
VIS    2025250    183200   19.5800  146.7800      13.1        56       951        97
VIS    2025250    183200   19.5700  146.7500      13.3        57       971        94
VIS    2025250    183200   19.5700  146.7400      13.0        59       971        92
VIS    2025250    183200   19.5900  146.7100      15.2        60       882        93
VIS    2025250    183200   19.5800  146.6300      16.4        53       955        97
VIS    2025250    183200   19.5900  146.6100      16.6        55       961        98
VIS    2025250    183200   19.5800  146.5900      16.3        58       959        97
VIS    2025250    183200   19.5800  146.5700      15.4        61       898        92
VIS    2025250    183200   19.5700  146.5500      14.8        63       851        93
VIS    2025250    183200   19.5700  146.5000      14.8        77       728        98
VIS    2025250    183200   19.6400  152.0000       5.3        60       952        92
VIS    2025250    183200   19.6300  151.9900       5.3        62       952        95
VIS    2025250    183200   19.5900  149.0500      10.1        47      1000        92
VIS    2025250    183200   19.5800  149.0200       9.9        48      1000        93
VIS    2025250    183200   19.5800  149.0200       9.8        48      1000        94
VIS    2025250    183200   19.5800  148.9800       9.5        51       951        94
VIS    2025250    183200   19.5900  148.9600       9.1        49       950        98
VIS    2025250    183200   19.5800  148.9200       8.6        47       920        97
VIS    2025250    183200   19.5800  148.9200       8.8        48       920        98
VIS    2025250    183200   19.5900  148.8800       8.3        51       924        99
VIS    2025250    183200   19.5700  148.8600       8.5        53       940        94
VIS    2025250    183200   19.5900  148.1600      10.4        60       990        95
VIS    2025250    183200   19.5800  148.1400      10.1        57       975        96
VIS    2025250    183200   19.5700  148.0400      10.0        55       990        96
VIS    2025250    183200   19.5600  148.0100       9.8        54       940        97
VIS    2025250    183200   19.5700  147.9800      10.2        53       915        97
VIS    2025250    183200   19.5700  147.9500      10.9        48       903        95
VIS    2025250    183200   19.5800  147.9400      11.1        46       903        94
VIS    2025250    183200   19.5700  147.9000      11.3        53       889        97
VIS    2025250    183200   19.5800  147.8900      11.4        51       900        97
VIS    2025250    183200   19.5600  147.8600      11.1        54       914        95
VIS    2025250    183200   19.5800  147.8500      10.3        59       925        95
VIS    2025250    183200   19.5700  147.8000       9.7        65       889        97
VIS    2025250    183200   19.5800  147.8000       9.9        65       879        96
VIS    2025250    183200   19.5700  147.7700      11.6        55       879        93
VIS    2025250    183200   19.5800  147.7400      12.8        51       887        93
VIS    2025250    183200   19.5800  147.7200      12.1        48       915        96
VIS    2025250    183200   19.5800  147.7000      11.7        44       927        94
VIS    2025250    183200   19.5600  147.6600      11.3        51       907        94
VIS    2025250    183200   19.5600  147.6400      11.6        51       905        96
VIS    2025250    183200   19.5600  147.6200      11.8        52       904        97
VIS    2025250    183200   19.5600  147.5900      10.3        58       881        98
VIS    2025250    183200   19.5800  147.5600      11.0        57       861        97
VIS    2025250    183200   19.5800  147.5300      11.9        50       861        94
VIS    2025250    183200   19.5600  147.5100      11.4        56       841        97
VIS    2025250    183200   19.5700  147.5000      10.5        58       787        92
VIS    2025250    183200   19.5600  147.4700      10.3        61       827        96
VIS    2025250    183200   19.5600  147.4400      11.0        53       865        96
VIS    2025250    183200   19.5700  147.4200      11.0        61       860        98
VIS    2025250    183200   19.5600  147.3900      10.8        69       806        98
VIS    2025250    183200   19.5700  147.3700      10.9        68       806        98
VIS    2025250    183200   19.5600  147.3400      11.4        62       869        99
VIS    2025250    183200   19.5700  147.3200      11.0        64       867        99
VIS    2025250    183200   19.5700  147.2800      10.8        67       801        94
VIS    2025250    183200   19.5800  147.2800      10.8        68       789        93
VIS    2025250    183200   19.5700  147.2400      10.6        75       829        94
VIS    2025250    183200   19.5700  147.2100      11.4        60       979        93
VIS    2025250    183200   19.5700  147.2000      11.8        57       979        94
VIS    2025250    183200   19.5700  147.1800      12.5        53       968        98
VIS    2025250    183200   19.5600  147.1500      12.2        55       870        95
VIS    2025250    183200   19.5600  147.1200      11.1        68       809        92
VIS    2025250    183200   19.5700  147.0700      11.3        75       758        97
VIS    2025250    183200   19.5600  147.0300      11.4        79       735        96
VIS    2025250    183200   19.5600  147.0200      11.2        78       735        96
VIS    2025250    183200   19.5500  146.9800      12.6        60       911        97
VIS    2025250    183200   19.5600  146.9800      13.0        57       916        98
VIS    2025250    183200   19.5500  146.9400      10.6        80       856        90
VIS    2025250    183200   19.5700  146.9200      10.8        73       825        93
VIS    2025250    183200   19.5700  146.8100      11.1        67       856        93
VIS    2025250    183200   19.5500  146.7900      13.7        55       951        98
VIS    2025250    183200   19.5500  146.7700      14.2        52       962        97
VIS    2025250    183200   19.5700  146.7400      12.6        61       974        92
VIS    2025250    183200   19.5500  146.7100      12.6        70       897        97
VIS    2025250    183200   19.5500  146.7100      12.7        69       776        98
VIS    2025250    183200   19.5500  146.6500      16.2        57       779        90
VIS    2025250    183200   19.5500  146.6100      16.9        61       955        99
VIS    2025250    183200   19.5500  146.6000      16.9        63       936        98
VIS    2025250    183200   19.5600  146.5800      16.5        65       860        94
VIS    2025250    183200   19.5700  146.5600      15.2        64       851        94
VIS    2025250    183200   19.5600  146.5200      14.4        73       733        95
VIS    2025250    183200   19.6000  152.0000       4.5        75       949        92
VIS    2025250    183200   19.6100  152.0000       4.9        66       949        95
VIS    2025250    183200   19.5500  149.0400       9.3        47      1000        93
VIS    2025250    183200   19.5700  149.0100       9.6        49       989        95
VIS    2025250    183200   19.5600  148.9100       9.2        51       919        97
VIS    2025250    183200   19.5600  148.8700       8.9        50       948        96
VIS    2025250    183200   19.5500  148.8700       9.1        49       949        91
VIS    2025250    183200   19.5700  148.8400       8.7        53       935        93
VIS    2025250    183200   19.5500  148.1400      10.4        61       991        93
VIS    2025250    183200   19.5600  148.1400      10.4        59       975        91
VIS    2025250    183200   19.5500  148.0800       9.4        60       970        93
VIS    2025250    183200   19.5500  148.0600      10.2        49       997        97
VIS    2025250    183200   19.5600  148.0300       9.9        51       948        98
VIS    2025250    183200   19.5600  148.0100       9.8        54       940        96
VIS    2025250    183200   19.5500  147.9700      10.6        50       902        92
VIS    2025250    183200   19.5600  147.9600      11.0        48       903        94
VIS    2025250    183200   19.5400  147.9300      10.9        51       886        93
VIS    2025250    183200   19.5500  147.9100      10.7        58       884        95
VIS    2025250    183200   19.5500  147.8800      10.9        60       871        92
VIS    2025250    183200   19.5600  147.8600      11.2        54       908        95
VIS    2025250    183200   19.5500  147.8400      10.8        54       919        98
VIS    2025250    183200   19.5600  147.8100       9.6        60       902        98
VIS    2025250    183200   19.5400  147.7900       9.9        52       873        96
VIS    2025250    183200   19.5400  147.7500      11.5        52       886        96
VIS    2025250    183200   19.5500  147.7200      11.7        48       901        95
VIS    2025250    183200   19.5500  147.6900      11.7        47       918        95
VIS    2025250    183200   19.5400  147.6900      11.6        48       915        95
VIS    2025250    183200   19.5500  147.6400      11.7        51       907        96
VIS    2025250    183200   19.5500  147.6400      11.7        51       907        96
VIS    2025250    183200   19.5400  147.5900      10.3        56       901        97
VIS    2025250    183200   19.5400  147.5900      10.1        59       882        97
VIS    2025250    183200   19.5400  147.5600      10.1        62       845        95
VIS    2025250    183200   19.5500  147.5400      11.9        56       861        97
VIS    2025250    183200   19.5500  147.5000      11.5        57       856        98
VIS    2025250    183200   19.5500  147.4700      10.3        62       825        97
VIS    2025250    183200   19.5500  147.4500      10.9        54       860        95
VIS    2025250    183200   19.5500  147.4300      11.0        54       867        97
VIS    2025250    183200   19.5500  147.4100      10.7        60       860        98
VIS    2025250    183200   19.5500  147.3900      10.9        64       848        99
VIS    2025250    183200   19.5300  147.3600      11.8        56       861        96
VIS    2025250    183200   19.5500  147.3400      11.7        61       874        99
VIS    2025250    183200   19.5500  147.3200      11.6        62       877        98
VIS    2025250    183200   19.5500  147.2800      11.1        67       824        92
VIS    2025250    183200   19.5400  147.2500      11.8        61       844        92
VIS    2025250    183200   19.5400  147.2000      11.9        54       975        95
VIS    2025250    183200   19.5300  147.1800      12.1        52       905        94
VIS    2025250    183200   19.5300  147.1700      11.8        53       898        94
VIS    2025250    183200   19.5300  147.1100      10.4        70       819        91
VIS    2025250    183200   19.5300  147.0800      10.8        71       800        95
VIS    2025250    183200   19.5300  147.0500      11.6        74       771        97
VIS    2025250    183200   19.5400  147.0400      11.7        78       740        98
VIS    2025250    183200   19.5400  147.0100      12.2        71       771        93
VIS    2025250    183200   19.5400  146.9700      12.2        62       911        97
VIS    2025250    183200   19.5400  146.9700      12.1        64       911        97
VIS    2025250    183200   19.5500  146.8300      11.3        63       846        91
VIS    2025250    183200   19.5300  146.8000      13.3        51       856        90
VIS    2025250    183200   19.5500  146.7900      13.4        56       940        95
VIS    2025250    183200   19.5400  146.7500      13.4        59       974        94
VIS    2025250    183200   19.5200  146.7000      15.0        67       755        94
VIS    2025250    183200   19.5300  146.6900      15.8        62       745        91
VIS    2025250    183200   19.5200  146.6500      16.9        56       924        96
VIS    2025250    183200   19.5300  146.6400      16.8        58       924        97
VIS    2025250    183200   19.5300  146.6200      16.7        62       936        99
VIS    2025250    183200   19.5400  146.5800      16.4        72       823        95
VIS    2025250    183200   19.5300  146.5600      15.1        78       754        97
VIS    2025250    183200   19.5400  146.5400      14.7        72       728        92
VIS    2025250    183200   19.5200  148.8400       9.1        47       956        94
VIS    2025250    183200   19.5300  148.0800      10.2        44       988        99
VIS    2025250    183200   19.5300  148.0700      10.4        40       988        99
VIS    2025250    183200   19.5100  148.0300      10.7        42       955       100
VIS    2025250    183200   19.5200  148.0000       9.5        57       940        97
VIS    2025250    183200   19.5200  147.9800       9.3        63       906        97
VIS    2025250    183200   19.5100  147.9500      10.0        54       899        96
VIS    2025250    183200   19.5300  147.9300      10.8        51       886        93
VIS    2025250    183200   19.5300  147.9200      10.5        55       884        94
VIS    2025250    183200   19.5100  147.8800      10.4        64       860        96
VIS    2025250    183200   19.5300  147.8700      11.2        61       871        95
VIS    2025250    183200   19.5300  147.8500      10.9        58       886        97
VIS    2025250    183200   19.5100  147.8100       9.6        52       902        90
VIS    2025250    183200   19.5300  147.7800      10.1        51       877        95
VIS    2025250    183200   19.5200  147.7700      10.4        48       886        94
VIS    2025250    183200   19.5200  147.7400      11.6        47       895        95
VIS    2025250    183200   19.5300  147.7100      11.6        47       901        95
VIS    2025250    183200   19.5300  147.6900      11.5        50       913        96
VIS    2025250    183200   19.5200  147.6600      11.5        52       910        96
VIS    2025250    183200   19.5200  147.6300      11.4        47       913        95
VIS    2025250    183200   19.5200  147.6300      11.3        46       915        95
VIS    2025250    183200   19.5300  147.5900      10.4        54       902        96
VIS    2025250    183200   19.5200  147.5600       9.8        60       845        91
VIS    2025250    183200   19.5200  147.5500      10.1        62       845        93
VIS    2025250    183200   19.5300  147.5200      11.9        59       827        96
VIS    2025250    183200   19.5300  147.5000      11.9        63       827        98
VIS    2025250    183200   19.5100  147.4600      11.7        52       871        96
VIS    2025250    183200   19.5100  147.4400      11.6        52       870        96
VIS    2025250    183200   19.5200  147.4200      11.6        52       866        95
VIS    2025250    183200   19.5200  147.4000      11.8        53       862        95
VIS    2025250    183200   19.5200  147.3600      11.6        56       858        97
VIS    2025250    183200   19.5300  147.3300      12.5        55       875        96
VIS    2025250    183200   19.5300  147.3300      12.5        56       877        96
VIS    2025250    183200   19.5300  147.2500      11.7        58       876        91
VIS    2025250    183200   19.5100  147.2100      12.2        52       958        97
VIS    2025250    183200   19.5200  147.2000      12.1        53       958        96
VIS    2025250    183200   19.5200  147.1800      12.0        53       905        90
VIS    2025250    183200   19.5100  147.0700      11.4        66       805        93
VIS    2025250    183200   19.5200  147.0500      11.8        70       775        96
VIS    2025250    183200   19.5200  147.0100      12.3        72       779        95
VIS    2025250    183200   19.5200  146.9900      12.8        65       836        96
VIS    2025250    183200   19.5200  146.9800      12.4        65       911        97
VIS    2025250    183200   19.5200  146.8900      11.0        56       749        90
VIS    2025250    183200   19.5100  146.8100      13.7        49       846        91
VIS    2025250    183200   19.5100  146.8100      13.9        49       850        91
VIS    2025250    183200   19.5000  146.7800      15.0        50       908        90
VIS    2025250    183200   19.5200  146.7400      14.0        66       919        96
VIS    2025250    183200   19.5100  146.7300      14.2        70       903        98
VIS    2025250    183200   19.5200  146.6900      15.9        62       746        91
VIS    2025250    183200   19.5100  146.6700      16.5        57       909        95
VIS    2025250    183200   19.5100  146.6500      16.8        58       924        96
VIS    2025250    183200   19.5200  146.6300      16.4        59       924        96
VIS    2025250    183200   19.5000  146.5900      15.8        80       790        95
VIS    2025250    183200   19.5200  149.0000       8.7        46       967        94
VIS    2025250    183200   19.5200  148.9700       8.9        51       964        91
VIS    2025250    183200   19.5100  148.9300       9.8        59       920        92
VIS    2025250    183200   19.5000  148.8900      10.1        56       918        96
VIS    2025250    183200   19.5200  148.8800       9.9        47       941        93
VIS    2025250    183200   19.5200  148.8400       9.1        47       956        95
VIS    2025250    183200   19.5000  148.8300       9.3        48       956        97
VIS    2025250    183200   19.5000  148.0900      10.2        44       994        95
VIS    2025250    183200   19.4900  148.0500      10.7        40       979        98
VIS    2025250    183200   19.4900  148.0300      11.0        41       955        99
VIS    2025250    183200   19.4900  147.9900      10.5        55       921       100
VIS    2025250    183200   19.4900  147.9700       9.7        58       906        99
VIS    2025250    183200   19.5000  147.9600       9.7        58       899        98
VIS    2025250    183200   19.5000  147.9200      10.6        54       868        92
VIS    2025250    183200   19.5100  147.9000      10.7        58       858        93
VIS    2025250    183200   19.5000  147.8700      10.8        65       863        97
VIS    2025250    183200   19.5100  147.8400      10.6        59       887        97
VIS    2025250    183200   19.5100  147.8300      10.5        58       887        97
VIS    2025250    183200   19.5100  147.8000       9.6        51       902        91
VIS    2025250    183200   19.5100  147.7600      10.8        44       900        94
VIS    2025250    183200   19.5100  147.7200      12.1        45       898        94
VIS    2025250    183200   19.4900  147.6900      12.0        50       898        95
VIS    2025250    183200   19.4900  147.6600      11.3        55       908        95
VIS    2025250    183200   19.4900  147.6500      11.2        53       908        92
VIS    2025250    183200   19.4800  147.6100      11.6        46       902        95
VIS    2025250    183200   19.4900  147.6100      11.5        46       901        95
VIS    2025250    183200   19.4800  147.5800      11.0        55       894        98
VIS    2025250    183200   19.5000  147.5200      10.7        63       776        92
VIS    2025250    183200   19.5000  147.5000      11.5        65       776        94
VIS    2025250    183200   19.4900  147.4700      11.7        58       870        99
VIS    2025250    183200   19.4900  147.4500      12.0        51       871        96
VIS    2025250    183200   19.5000  147.4400      11.6        52       870        95
VIS    2025250    183200   19.4900  147.4000      11.7        51       864        94
VIS    2025250    183200   19.5000  147.3700      12.0        55       860        97
VIS    2025250    183200   19.4900  147.3500      12.8        57       875        98
VIS    2025250    183200   19.4900  147.3200      12.5        58       889        98
VIS    2025250    183200   19.4900  147.2900      10.9        62       895        92
VIS    2025250    183200   19.4900  147.2900      10.7        62       895        91
VIS    2025250    183200   19.4900  147.2400      11.4        54       897        96
VIS    2025250    183200   19.4900  147.2300      11.9        51       917        93
VIS    2025250    183200   19.4800  147.1300      10.6        65       761        90
VIS    2025250    183200   19.4900  147.0600      11.6        65       800        91
VIS    2025250    183200   19.4800  147.0200      12.7        78       771        97
VIS    2025250    183200   19.5000  147.0000      13.0        72       805        97
VIS    2025250    183200   19.4800  146.8000      15.0        49       873        92
VIS    2025250    183200   19.5000  146.7800      15.0        51       908        94
VIS    2025250    183200   19.4900  146.7700      13.9        58       908        99
VIS    2025250    183200   19.4900  146.7000      14.4        73       796        90
VIS    2025250    183200   19.4900  146.6700      15.5        60       907        95
VIS    2025250    183200   19.4800  146.6500      13.5        63       909        96
VIS    2025250    183200   19.4900  146.6400      13.9        64       909        97
VIS    2025250    183200   19.4900  146.6200      13.5        71       900        92
VIS    2025250    183200   19.4800  149.0000      10.0        57       969        91
VIS    2025250    183200   19.4900  148.9700      10.4        60       959        90
VIS    2025250    183200   19.4700  148.9500      10.1        61       926        94
VIS    2025250    183200   19.4900  148.9300       9.8        65       922        97
VIS    2025250    183200   19.4900  148.9000      10.1        61       910        98
VIS    2025250    183200   19.4900  148.8600      10.0        54       952        91
VIS    2025250    183200   19.4700  148.8400       9.5        50       949        96
VIS    2025250    183200   19.4900  148.8200       9.3        48       956        97
VIS    2025250    183200   19.4700  148.8000       9.3        44       940        98
VIS    2025250    183200   19.4700  148.0500      10.0        45       981        98
VIS    2025250    183200   19.4700  148.0200      10.9        44       936        98
VIS    2025250    183200   19.4600  147.9800      11.2        46       932        98
VIS    2025250    183200   19.4600  147.9800      11.0        47       944        99
VIS    2025250    183200   19.4600  147.9400      10.0        53       902        99
VIS    2025250    183200   19.4600  147.9200      10.0        58       868        99
VIS    2025250    183200   19.4600  147.8900      10.5        69       859        95
VIS    2025250    183200   19.4800  147.8700      11.2        69       863        96
VIS    2025250    183200   19.4600  147.8300      10.3        59       876        99
VIS    2025250    183200   19.4700  147.8200      10.8        51       919        99
VIS    2025250    183200   19.4700  147.8000      11.1        48       925        98
VIS    2025250    183200   19.4600  147.7800      11.4        45       934        97
VIS    2025250    183200   19.4800  147.7200      13.0        46       910        92
VIS    2025250    183200   19.4800  147.7000      12.4        50       898        95
VIS    2025250    183200   19.4600  147.6600      11.3        54       898        94
VIS    2025250    183200   19.4700  147.6500      11.4        53       904        93
VIS    2025250    183200   19.4700  147.6100      11.8        46       901        95
VIS    2025250    183200   19.4700  147.6100      11.8        47       901        95
VIS    2025250    183200   19.4800  147.5800      11.3        54       895        98
VIS    2025250    183200   19.4600  147.5500       9.6        63       793        92
VIS    2025250    183200   19.4600  147.5200       9.8        63       757        90
VIS    2025250    183200   19.4600  147.5000      10.3        67       801        94
VIS    2025250    183200   19.4700  147.4600      11.7        59       871        99
VIS    2025250    183200   19.4600  147.4400      12.0        54       870        96
VIS    2025250    183200   19.4800  147.4300      11.8        49       867        94
VIS    2025250    183200   19.4700  147.3900      11.9        49       867        93
VIS    2025250    183200   19.4700  147.3800      11.9        49       869        94
VIS    2025250    183200   19.4600  147.3400      12.3        50       896        95
VIS    2025250    183200   19.4800  147.3300      12.5        56       895        99
VIS    2025250    183200   19.4700  147.3000      11.6        53       896        95
VIS    2025250    183200   19.4600  147.2500      11.0        54       868        91
VIS    2025250    183200   19.4800  147.2300      11.7        51       917        93
VIS    2025250    183200   19.4500  147.1900      10.2        62       887        90
VIS    2025250    183200   19.4700  147.1700      10.1        67       762        90
VIS    2025250    183200   19.4500  147.1400      10.2        64       744        90
VIS    2025250    183200   19.4600  147.0400      11.4        70       752        94
VIS    2025250    183200   19.4700  147.0200      12.6        78       771        97
VIS    2025250    183200   19.4600  146.8300      12.2        53       841        92
VIS    2025250    183200   19.4500  146.8100      13.6        50       905        95
VIS    2025250    183200   19.4500  146.7700      14.1        63       895        94
VIS    2025250    183200   19.4700  146.7500      13.2        80       870        90
VIS    2025250    183200   19.4700  146.7300      12.8        90       749        91
VIS    2025250    183200   19.4700  146.6500      11.5        67       907        94
VIS    2025250    183200   19.4600  146.6400      11.4        72       823        98
VIS    2025250    183200   19.4500  146.6200      13.3        82       743        98
VIS    2025250    183200   19.4600  149.0100      10.1        55       969        92
VIS    2025250    183200   19.4600  148.9900      10.0        55       940        95
VIS    2025250    183200   19.4700  148.9700      10.3        57       940        93
VIS    2025250    183200   19.4700  148.9500      10.2        61       926        94
VIS    2025250    183200   19.4700  148.9000      10.3        62       919        98
VIS    2025250    183200   19.4600  148.9000      10.3        60       919        99
VIS    2025250    183200   19.4600  148.8600       9.9        54       950        91
VIS    2025250    183200   19.4700  148.8300       9.4        47       947        97
VIS    2025250    183200   19.4600  148.8100       9.1        43       942        97
VIS    2025250    183200   19.4700  148.7900       9.3        44       942        98
VIS    2025250    183200   19.4400  148.0800       9.9        52       981        96
VIS    2025250    183200   19.4400  148.0500       9.5        51       964        98
VIS    2025250    183200   19.4400  148.0400       9.5        50       957        98
VIS    2025250    183200   19.4400  148.0100      10.4        47       928        98
VIS    2025250    183200   19.4500  147.9700      11.0        45       932        98
VIS    2025250    183200   19.4600  147.9700      10.7        47       944        99
VIS    2025250    183200   19.4400  147.9400      10.5        48       902        98
VIS    2025250    183200   19.4500  147.9200       9.8        57       868        97
VIS    2025250    183200   19.4400  147.8700      10.4        71       868        92
VIS    2025250    183200   19.4500  147.8700      10.8        73       868        92
VIS    2025250    183200   19.4600  147.8300      10.4        55       876        97
VIS    2025250    183200   19.4600  147.8200      10.7        51       892        98
VIS    2025250    183200   19.4400  147.7800      11.3        45       925        97
VIS    2025250    183200   19.4500  147.7500      11.1        48       937        96
VIS    2025250    183200   19.4400  147.7200      11.2        55       930        97
VIS    2025250    183200   19.4600  147.7100      11.9        52       922        97
VIS    2025250    183200   19.4500  147.6800      10.9        53       907        96
VIS    2025250    183200   19.4400  147.6600      11.0        54       899        94
VIS    2025250    183200   19.4500  147.6300      11.8        49       901        93
VIS    2025250    183200   19.4300  147.6100      11.5        49       895        93
VIS    2025250    183200   19.4500  147.6000      11.4        52       888        96
VIS    2025250    183200   19.4500  147.5700      10.2        60       843        96
VIS    2025250    183200   19.4300  147.5400       9.5        69       754        93
VIS    2025250    183200   19.4500  147.5000      10.0        66       801        94
VIS    2025250    183200   19.4500  147.5000      10.2        66       801        94
VIS    2025250    183200   19.4300  147.4500      11.6        55       874        96
VIS    2025250    183200   19.4500  147.4400      12.0        53       869        96
VIS    2025250    183200   19.4400  147.4000      11.7        49       869        94
VIS    2025250    183200   19.4400  147.4000      11.6        48       869        94
VIS    2025250    183200   19.4400  147.3500      11.5        49       896        93
VIS    2025250    183200   19.4500  147.3400      12.1        49       901        94
VIS    2025250    183200   19.4500  147.3200      12.0        49       905        95
VIS    2025250    183200   19.4500  147.2800      11.1        48       908        93
VIS    2025250    183200   19.4500  147.2500      11.0        54       868        90
VIS    2025250    183200   19.4500  147.2200      11.1        55       873        91
VIS    2025250    183200   19.4500  147.1800      10.0        64       863        90
VIS    2025250    183200   19.4400  147.1100      11.1        64       754        91
VIS    2025250    183200   19.4300  146.9600      11.9        65       759        92
VIS    2025250    183200   19.4500  146.8400      11.5        56       844        90
VIS    2025250    183200   19.4500  146.8300      12.4        53       873        93
VIS    2025250    183200   19.4500  146.8000      13.8        51       905        95
VIS    2025250    183200   19.4500  146.7800      14.3        60       905        92
VIS    2025250    183200   19.4400  146.7200      11.9        85       724        97
VIS    2025250    183200   19.4300  146.6400      12.1        76       743        96
VIS    2025250    183200   19.4400  146.6200      13.2        81       743        99
VIS    2025250    183200   19.4300  146.6000      13.4        80       732        99
VIS    2025250    183200   19.4400  149.3400       8.7        58       972        91
VIS    2025250    183200   19.4300  149.3200       8.9        60       966        90
VIS    2025250    183200   19.4300  149.0300      10.7        53       969        92
VIS    2025250    183200   19.4300  149.0200      10.5        52       940        96
VIS    2025250    183200   19.4300  148.9900      10.1        50       939        97
VIS    2025250    183200   19.4400  148.9700      10.2        51       928        98
VIS    2025250    183200   19.4200  148.9400      10.4        49       919        95
VIS    2025250    183200   19.4400  148.9100      10.1        52       919        98
VIS    2025250    183200   19.4400  148.9000      10.2        51       919        95
VIS    2025250    183200   19.4400  148.8300       9.6        46       950        92
VIS    2025250    183200   19.4400  148.8300       9.5        44       966        92
VIS    2025250    183200   19.4200  148.1300       9.7        58       976        91
VIS    2025250    183200   19.4100  148.0800       9.9        47       959        97
VIS    2025250    183200   19.4300  148.0400       9.4        50       957        98
VIS    2025250    183200   19.4300  148.0300       9.5        49       954        99
VIS    2025250    183200   19.4200  148.0000       9.9        46       900        97
VIS    2025250    183200   19.4300  147.9800      10.7        44       902        93
VIS    2025250    183200   19.4100  147.9400      10.7        43       906        97
VIS    2025250    183200   19.4300  147.9300      10.4        48       895        98
VIS    2025250    183200   19.4200  147.8900      10.2        58       871        92
VIS    2025250    183200   19.4200  147.8700      10.0        57       872        94
VIS    2025250    183200   19.4100  147.8400      10.8        49       873        95
VIS    2025250    183200   19.4100  147.8300      11.3        45       892        95
VIS    2025250    183200   19.4100  147.8000      11.3        45       921        98
VIS    2025250    183200   19.4100  147.7800      10.8        49       928        98
VIS    2025250    183200   19.4200  147.7600      10.6        51       937        97
VIS    2025250    183200   19.4100  147.7400      10.7        54       933        96
VIS    2025250    183200   19.4200  147.7000      10.4        53       922        95
VIS    2025250    183200   19.4300  147.6700      10.5        54       899        94
VIS    2025250    183200   19.4200  147.6600      10.5        53       899        95
VIS    2025250    183200   19.4100  147.6400      11.0        49       895        96
VIS    2025250    183200   19.4100  147.6100      11.1        51       895        96
VIS    2025250    183200   19.4100  147.5900      10.3        60       861        95
VIS    2025250    183200   19.4200  147.5600       9.3        73       794        90
VIS    2025250    183200   19.4300  147.5300       9.6        69       754        93
VIS    2025250    183200   19.4200  147.5000      10.8        60       801        94
VIS    2025250    183200   19.4100  147.4700      11.9        52       879        96
VIS    2025250    183200   19.4200  147.4600      11.8        51       878        96
VIS    2025250    183200   19.4200  147.4300      11.6        53       871        93
VIS    2025250    183200   19.4100  147.4100      11.2        54       871        94
VIS    2025250    183200   19.4200  147.3100      11.1        45       918        94
VIS    2025250    183200   19.4100  147.2900      11.5        50       918        98
VIS    2025250    183200   19.4300  147.2600      10.9        55       898        95
VIS    2025250    183200   19.4300  147.2200      10.8        57       846        92
VIS    2025250    183200   19.4100  147.2200      10.3        60       836        92
VIS    2025250    183200   19.4100  147.1900       9.8        64       836        93
VIS    2025250    183200   19.4100  147.1700       9.9        64       757        91
VIS    2025250    183200   19.4000  146.9500      12.1        63       771        93
VIS    2025250    183200   19.4000  146.8000      13.9        54       977        99
VIS    2025250    183200   19.4100  146.7900      13.9        54       895        94
VIS    2025250    183200   19.4300  149.3400       8.7        57       972        91
VIS    2025250    183200   19.4100  149.0600      10.4        57       993        91
VIS    2025250    183200   19.4100  149.0400      10.5        53       965        93
VIS    2025250    183200   19.4200  149.0200      10.5        52       939        96
VIS    2025250    183200   19.4100  148.9900      10.3        48       926        97
VIS    2025250    183200   19.4200  148.9700      10.4        48       928        97
VIS    2025250    183200   19.4000  148.9500      10.4        48       919        95
VIS    2025250    183200   19.4100  148.9300      10.4        47       919        95
VIS    2025250    183200   19.4100  148.8900      10.5        50       920        93
VIS    2025250    183200   19.4000  148.8700      10.7        51       958        90
VIS    2025250    183200   19.4000  148.8100      10.6        46       983        94
VIS    2025250    183200   19.3900  148.2100       8.9        57       997        93
VIS    2025250    183200   19.4100  148.1300      10.2        57       965        91
VIS    2025250    183200   19.4000  148.0900      10.0        48       970        99
VIS    2025250    183200   19.4000  148.0600       9.7        43       957        99
VIS    2025250    183200   19.3900  148.0400      10.0        43       950        99
VIS    2025250    183200   19.3900  148.0300      10.1        42       950        99
VIS    2025250    183200   19.3900  148.0100       9.8        43       928        98
VIS    2025250    183200   19.4000  147.9800      10.1        44       883        94
VIS    2025250    183200   19.4000  147.9500      11.0        42       899        95
VIS    2025250    183200   19.3900  147.9300      10.7        47       906        95
VIS    2025250    183200   19.4000  147.8900      10.4        56       873        94
VIS    2025250    183200   19.4000  147.8800      10.5        56       872        96
VIS    2025250    183200   19.4100  147.8500      10.8        49       873        95
VIS    2025250    183200   19.4000  147.8200      11.5        44       903        96
VIS    2025250    183200   19.3900  147.8100      12.1        42       912        95
VIS    2025250    183200   19.4100  147.7800      10.8        49       940        98
VIS    2025250    183200   19.3900  147.7400      10.9        50       949        97
VIS    2025250    183200   19.4000  147.7300      10.6        52       930        97
VIS    2025250    183200   19.3900  147.6900      10.6        48       908        95
VIS    2025250    183200   19.4000  147.6800      10.2        49       899        94
VIS    2025250    183200   19.3900  147.6500      11.1        47       895        96
VIS    2025250    183200   19.4000  147.6200      11.3        50       895        97
VIS    2025250    183200   19.3900  147.6000      10.7        54       875        95
VIS    2025250    183200   19.3900  147.5900      10.1        60       861        94
VIS    2025250    183200   19.4000  147.5600       9.4        76       771        94
VIS    2025250    183200   19.3800  147.5200      11.6        67       784        96
VIS    2025250    183200   19.3900  147.4900      12.9        54       865        96
VIS    2025250    183200   19.3800  147.4700      12.4        54       879        97
VIS    2025250    183200   19.3800  147.4600      12.3        54       879        98
VIS    2025250    183200   19.3900  147.4200      10.8        58       879        96
VIS    2025250    183200   19.4000  147.3900      10.5        57       879        96
VIS    2025250    183200   19.3900  147.3200      11.4        45       921        94
VIS    2025250    183200   19.3800  147.3000      12.3        47       918        97
VIS    2025250    183200   19.3800  147.2800      12.3        54       913        99
VIS    2025250    183200   19.3900  147.2600      12.1        57       908        99
VIS    2025250    183200   19.3800  147.2200      10.6        57       809        91
VIS    2025250    183200   19.4000  147.2000       9.9        64       809        92
VIS    2025250    183200   19.3900  147.1900       9.9        64       779        92
VIS    2025250    183200   19.3800  147.1600      10.5        61       747        90
VIS    2025250    183200   19.3900  146.9900      10.8        58       737        90
VIS    2025250    183200   19.3900  146.9500      11.9        59       783        91
VIS    2025250    183200   19.3800  146.9400      11.8        58       809        91
VIS    2025250    183200   19.3800  146.8400      12.8        60       935        96
VIS    2025250    183200   19.3900  146.8000      14.1        54       977       100
VIS    2025250    183200   19.3900  146.7900      13.8        54       838        93
VIS    2025250    183200   19.3900  149.3400       8.0        37       981        94
VIS    2025250    183200   19.3800  149.1000      10.2        50       980        92
VIS    2025250    183200   19.3900  149.0800       9.2        59       980        90
VIS    2025250    183200   19.4000  149.0300      10.1        52       951        95
VIS    2025250    183200   19.3900  149.0100       9.9        50       916        97
VIS    2025250    183200   19.3900  148.9800      10.1        48       909        96
VIS    2025250    183200   19.4000  148.9500      10.3        47       919        95
VIS    2025250    183200   19.4000  148.9300      10.5        47       919        95
VIS    2025250    183200   19.3800  148.9100      10.5        48       919        94
VIS    2025250    183200   19.3900  148.8700      10.6        50       958        92
VIS    2025250    183200   19.3900  148.8700      10.5        50       974        93
VIS    2025250    183200   19.3800  148.8400      10.0        46       983        95
VIS    2025250    183200   19.3700  148.8100      10.3        45       983        93
VIS    2025250    183200   19.3700  148.7800      10.0        44       950        95
VIS    2025250    183200   19.3900  148.2100       9.3        52       997        96
VIS    2025250    183200   19.3700  148.1000      10.5        54       955        95
VIS    2025250    183200   19.3800  148.0800      10.1        47       955        99
VIS    2025250    183200   19.3600  148.0600      10.2        47       936        98
VIS    2025250    183200   19.3600  148.0300      10.0        44       936        98
VIS    2025250    183200   19.3800  148.0200      10.0        43       936        99
VIS    2025250    183200   19.3800  148.0000       9.6        46       900        97
VIS    2025250    183200   19.3800  147.9500      10.6        50       887        94
VIS    2025250    183200   19.3800  147.9400      10.7        48       906        92
VIS    2025250    183200   19.3600  147.9200       9.6        61       938        91
VIS    2025250    183200   19.3800  147.8900       9.9        61       871        96
VIS    2025250    183200   19.3700  147.8600      10.0        60       872        97
VIS    2025250    183200   19.3800  147.8400      10.9        48       883        94
VIS    2025250    183200   19.3800  147.8100      12.0        42       915        95
VIS    2025250    183200   19.3600  147.7900      11.9        42       925        97
VIS    2025250    183200   19.3800  147.7600      11.3        47       962        98
VIS    2025250    183200   19.3800  147.7300      11.0        49       949        98
VIS    2025250    183200   19.3800  147.7200      10.9        49       949        98
VIS    2025250    183200   19.3800  147.6800      10.6        46       899        95
VIS    2025250    183200   19.3600  147.6700      10.8        45       894        93
VIS    2025250    183200   19.3800  147.6400      11.3        48       895        96
VIS    2025250    183200   19.3600  147.6200      11.4        54       875        97
VIS    2025250    183200   19.3600  147.5800       9.6        63       838        94
VIS    2025250    183200   19.3600  147.5500      10.1        69       781        96
VIS    2025250    183200   19.3600  147.5300      11.0        68       781        97
VIS    2025250    183200   19.3800  147.5300      11.4        70       781        97
VIS    2025250    183200   19.3600  147.4800      12.4        54       864        96
VIS    2025250    183200   19.3800  147.4700      12.7        54       879        98
VIS    2025250    183200   19.3600  147.4300      10.9        55       888        95
VIS    2025250    183200   19.3600  147.4200      10.7        57       888        96
VIS    2025250    183200   19.3800  147.3900      10.6        60       888        97
VIS    2025250    183200   19.3600  147.3600      11.3        58       919        94
VIS    2025250    183200   19.3600  147.3400      11.4        51       921        96
VIS    2025250    183200   19.3700  147.3300      11.6        47       921        96
VIS    2025250    183200   19.3800  147.2800      12.3        53       915        99
VIS    2025250    183200   19.3700  147.2600      12.0        57       908        99
VIS    2025250    183200   19.3700  147.2400      11.6        56       890        97
VIS    2025250    183200   19.3500  147.1600      11.0        63       758        92
VIS    2025250    183200   19.3600  147.1500      10.8        62       749        91
VIS    2025250    183200   19.3500  146.9600      11.7        58       809        90
VIS    2025250    183200   19.3700  146.9600      11.6        59       783        91
VIS    2025250    183200   19.3600  146.9100      11.4        52       860        92
VIS    2025250    183200   19.3700  146.8400      12.5        59       935        97
VIS    2025250    183200   19.3600  146.8100      15.2        55       977        99
VIS    2025250    183200   19.3700  146.8000      14.6        54       838        92
VIS    2025250    183200   19.3600  149.1200      10.7        46       980        94
VIS    2025250    183200   19.3500  149.1000      10.5        47       980        94
VIS    2025250    183200   19.3500  149.0900      10.3        49       972        95
VIS    2025250    183200   19.3600  149.0500       9.7        52       957        96
VIS    2025250    183200   19.3700  149.0200       9.5        52       930        98
VIS    2025250    183200   19.3700  149.0000       9.6        50       914        97
VIS    2025250    183200   19.3600  148.9800       9.8        51       902        97
VIS    2025250    183200   19.3500  148.9600       9.9        50       900        96
VIS    2025250    183200   19.3600  148.9200      10.7        50       927        95
VIS    2025250    183200   19.3700  148.9100      10.8        50       929        94
VIS    2025250    183200   19.3600  148.8900      10.8        50       971        92
VIS    2025250    183200   19.3500  148.8500      10.6        49       966        94
VIS    2025250    183200   19.3500  148.8300      10.3        48       965        94
VIS    2025250    183200   19.3500  148.8000      10.0        43       951        93
VIS    2025250    183200   19.3500  148.2100       8.8        33       980        96
VIS    2025250    183200   19.3500  148.1100       9.7        58       965        95
VIS    2025250    183200   19.3600  148.1000      10.4        55       955        96
VIS    2025250    183200   19.3600  148.0600      10.3        49       938        99
VIS    2025250    183200   19.3400  148.0400      10.4        45       938        96
VIS    2025250    183200   19.3600  148.0300       9.9        45       936        99
VIS    2025250    183200   19.3600  148.0100       9.6        48       926        97
VIS    2025250    183200   19.3400  147.9800      10.2        61       892        97
VIS    2025250    183200   19.3600  147.9600      10.5        62       887        98
VIS    2025250    183200   19.3600  147.9200       9.6        62       938        91
VIS    2025250    183200   19.3600  147.9100       9.5        63       936        91
VIS    2025250    183200   19.3600  147.8800       9.6        70       863        97
VIS    2025250    183200   19.3500  147.8600       9.8        65       863        98
VIS    2025250    183200   19.3600  147.8200      11.1        45       906        96
VIS    2025250    183200   19.3400  147.7900      11.3        43       925        97
VIS    2025250    183200   19.3600  147.7800      11.8        42       925        97
VIS    2025250    183200   19.3400  147.7600      11.8        41       934        97
VIS    2025250    183200   19.3400  147.7400      11.2        42       932        95
VIS    2025250    183200   19.3500  147.7000      10.8        45       910        92
VIS    2025250    183200   19.3600  147.6700      10.9        45       894        93
VIS    2025250    183200   19.3400  147.6500      11.1        49       873        94
VIS    2025250    183200   19.3400  147.6300      11.5        53       864        96
VIS    2025250    183200   19.3500  147.5900      10.4        58       862        96
VIS    2025250    183200   19.3500  147.5900      10.1        60       862        96
VIS    2025250    183200   19.3500  147.5500      10.3        67       781        95
VIS    2025250    183200   19.3300  147.5200      12.1        54       826        94
VIS    2025250    183200   19.3500  147.5100      11.9        58       826        96
VIS    2025250    183200   19.3500  147.4800      12.2        55       864        97
VIS    2025250    183200   19.3300  147.4600      10.7        60       874        98
VIS    2025250    183200   19.3500  147.4300      10.9        55       888        96
VIS    2025250    183200   19.3400  147.4000      11.0        58       888        95
VIS    2025250    183200   19.3500  147.3900      11.2        60       888        94
VIS    2025250    183200   19.3500  147.3500      11.3        56       936        93
VIS    2025250    183200   19.3500  147.3400      11.4        54       936        95
VIS    2025250    183200   19.3500  147.3000      11.8        54       915        99
VIS    2025250    183200   19.3400  147.2800      11.0        60       908        96
VIS    2025250    183200   19.3400  147.2700      10.9        60       907        95
VIS    2025250    183200   19.3500  147.2400      11.2        59       809        90
VIS    2025250    183200   19.3500  147.1600      11.1        63       758        92
VIS    2025250    183200   19.3300  146.9400      12.3        50       868        92
VIS    2025250    183200   19.3400  146.9200      12.0        48       880        91
VIS    2025250    183200   19.3400  146.8300      12.5        61       965        96
VIS    2025250    183200   19.3300  146.8000      14.8        56       884        96
VIS    2025250    183200   19.3400  146.7900      13.9        59       838        95
VIS    2025250    183200   19.3500  146.7600      13.1        62       730        90
VIS    2025250    183200   19.3300  146.7000      14.3        59       739        91
VIS    2025250    183200   19.3300  146.7000      14.4        57       751        90
VIS    2025250    183200   19.3700  151.3900       6.2        69       973        94
VIS    2025250    183200   19.3600  151.3800       5.5        65       973        95
VIS    2025250    183200   19.3300  149.0900      10.1        48       972        96
VIS    2025250    183200   19.3300  149.0800      10.0        49       969        96
VIS    2025250    183200   19.3500  149.0600      10.2        49       960        96
VIS    2025250    183200   19.3300  149.0400      10.2        48       952        94
VIS    2025250    183200   19.3400  148.9900       9.8        51       912        97
VIS    2025250    183200   19.3400  148.9900      10.0        52       912        98
VIS    2025250    183200   19.3400  148.9400      10.2        50       909        96
VIS    2025250    183200   19.3500  148.9400      10.4        50       909        96
VIS    2025250    183200   19.3300  148.9100      10.4        51       943        96
VIS    2025250    183200   19.3200  148.8800      10.3        49       951        96
VIS    2025250    183200   19.3300  148.8400      10.5        49       965        93
VIS    2025250    183200   19.3300  148.8400      10.4        49       964        94
VIS    2025250    183200   19.3200  148.8000       9.5        46       927        96
VIS    2025250    183200   19.3400  148.2200       8.9        23       980        93
VIS    2025250    183200   19.3400  148.2000       8.0        37       965        96
VIS    2025250    183200   19.3300  148.1400       9.1        62       972        93
VIS    2025250    183200   19.3400  148.1000       9.9        54       955        97
VIS    2025250    183200   19.3200  148.0700      11.0        49       946        99
VIS    2025250    183200   19.3300  148.0400      10.5        45       944        97
VIS    2025250    183200   19.3300  148.0300      10.3        45       946        97
VIS    2025250    183200   19.3200  148.0000      10.9        48       897        96
VIS    2025250    183200   19.3100  147.9700      11.6        47       902        95
VIS    2025250    183200   19.3300  147.9400      10.3        64       954        91
VIS    2025250    183200   19.3300  147.9400      10.2        63       954        93
VIS    2025250    183200   19.3300  147.9100       9.4        67       906        93
VIS    2025250    183200   19.3100  147.8800       9.7        71       860        97
VIS    2025250    183200   19.3200  147.8500      10.2        66       863        99
VIS    2025250    183200   19.3200  147.8400      10.3        61       884        98
VIS    2025250    183200   19.3300  147.7900      11.0        44       915        95
VIS    2025250    183200   19.3200  147.7800      11.4        43       925        94
VIS    2025250    183200   19.3300  147.7500      11.6        40       925        96
VIS    2025250    183200   19.3300  147.7400      11.1        42       925        94
VIS    2025250    183200   19.3200  147.6900      10.0        46       899        90
VIS    2025250    183200   19.3300  147.6800      10.3        45       894        90
VIS    2025250    183200   19.3300  147.6500      11.3        49       868        94
VIS    2025250    183200   19.3300  147.6200      11.4        51       862        96
VIS    2025250    183200   19.3100  147.6100      11.6        48       856        93
VIS    2025250    183200   19.3100  147.5900      11.2        52       856        94
VIS    2025250    183200   19.3300  147.5600      10.8        59       826        94
VIS    2025250    183200   19.3200  147.5400      11.4        52       826        92
VIS    2025250    183200   19.3300  147.5200      12.2        51       841        94
VIS    2025250    183200   19.3100  147.4800      10.1        63       860        97
VIS    2025250    183200   19.3100  147.4600      10.0        62       864        98
VIS    2025250    183200   19.3100  147.4200      11.3        59       881        96
VIS    2025250    183200   19.3100  147.4200      11.6        59       882        96
VIS    2025250    183200   19.3100  147.3900      11.3        65       925        92
VIS    2025250    183200   19.3100  147.3300      11.3        56       940        99
VIS    2025250    183200   19.3200  147.3000      10.9        58       910        97
VIS    2025250    183200   19.3100  147.2900      10.6        59       907        94
VIS    2025250    183200   19.3100  146.9400      13.0        48       877        93
VIS    2025250    183200   19.3000  146.9000      12.1        52       870        94
VIS    2025250    183200   19.3100  146.8900      11.8        53       870        94
VIS    2025250    183200   19.3200  146.8000      14.5        56       957        98
VIS    2025250    183200   19.3200  146.8000      13.8        59       902        98
VIS    2025250    183200   19.3000  146.7600      11.9        85       722        98
VIS    2025250    183200   19.3200  146.7500      12.4        76       713        97
VIS    2025250    183200   19.3200  146.7100      14.4        63       702        91
VIS    2025250    183200   19.3200  146.7000      14.4        61       739        92
VIS    2025250    183200   19.3400  151.3800       5.9        67       973        97
VIS    2025250    183200   19.3400  151.3700       5.4        63       973        97
VIS    2025250    183200   19.3100  149.1100       9.3        46       993        97
VIS    2025250    183200   19.3000  149.0900       9.2        49       969        95
VIS    2025250    183200   19.3100  149.0500      10.2        51       952        93
VIS    2025250    183200   19.3200  149.0500      10.2        50       952        94
VIS    2025250    183200   19.3000  149.0000       9.7        48       927        98
VIS    2025250    183200   19.3100  149.0000       9.8        49       924        98
VIS    2025250    183200   19.3100  148.9700      10.0        52       939        97
VIS    2025250    183200   19.3100  148.9400       9.7        52       927        98
VIS    2025250    183200   19.3200  148.9100      10.3        51       938        97
VIS    2025250    183200   19.3000  148.8900      10.2        50       934        98
VIS    2025250    183200   19.3000  148.8500       9.9        48       928        97
VIS    2025250    183200   19.3000  148.8300       9.7        48       925        97
VIS    2025250    183200   19.3000  148.8100       8.9        45       925        95
VIS    2025250    183200   19.3100  148.8000       9.2        46       925        96
VIS    2025250    183200   19.3000  148.7600       9.2        46       983        93
VIS    2025250    183200   19.3000  148.1800       8.1        55       950        91
VIS    2025250    183200   19.3100  148.1400       9.3        55       979        92
VIS    2025250    183200   19.2900  148.1000      10.2        46       946       100
VIS    2025250    183200   19.3100  148.0800      11.1        47       946        99
VIS    2025250    183200   19.2900  148.0500      11.5        46       950        99
VIS    2025250    183200   19.3000  148.0300      11.0        47       946        98
VIS    2025250    183200   19.3000  148.0100      11.4        46       897        94
VIS    2025250    183200   19.3000  148.0000      11.5        45       889        93
VIS    2025250    183200   19.3000  147.9700      11.8        45       908        94
VIS    2025250    183200   19.3000  147.9500      10.6        52       928        94
VIS    2025250    183200   19.2900  147.9000       9.4        70       906        90
VIS    2025250    183200   19.3000  147.9000       9.6        69       871        94
VIS    2025250    183200   19.2900  147.8700      10.2        75       866        94
VIS    2025250    183200   19.2900  147.8300      10.6        70       894        93
VIS    2025250    183200   19.3100  147.8000      11.2        48       915        95
VIS    2025250    183200   19.3100  147.7800      11.8        42       932        92
VIS    2025250    183200   19.3000  147.7500      11.6        41       923        94
VIS    2025250    183200   19.2900  147.7400      11.3        42       915        94
VIS    2025250    183200   19.3000  147.7200      10.6        46       913        93
VIS    2025250    183200   19.2900  147.6800      10.6        47       881        94
VIS    2025250    183200   19.2900  147.6600      11.1        45       870        93
VIS    2025250    183200   19.2900  147.6400      11.4        46       868        93
VIS    2025250    183200   19.3100  147.6100      11.9        47       856        92
VIS    2025250    183200   19.3000  147.5800      11.2        52       856        93
VIS    2025250    183200   19.2800  147.5600      10.8        50       845        91
VIS    2025250    183200   19.3000  147.5400      11.2        49       841        92
VIS    2025250    183200   19.3000  147.5200      11.6        47       856        94
VIS    2025250    183200   19.2900  147.4900      10.3        54       856        96
VIS    2025250    183200   19.3000  147.4600       9.9        63       861        98
VIS    2025250    183200   19.3000  147.4500      10.2        62       861        98
VIS    2025250    183200   19.2900  147.4300      11.0        58       868        93
VIS    2025250    183200   19.3000  147.3800      11.3        65       948        93
VIS    2025250    183200   19.3000  147.3800      11.3        64       955        95
VIS    2025250    183200   19.2800  147.3300      11.2        58       962        97
VIS    2025250    183200   19.3000  147.3300      11.2        58       943        98
VIS    2025250    183200   19.2800  146.9400      13.2        49       877        93
VIS    2025250    183200   19.2800  146.9300      12.8        50       877        93
VIS    2025250    183200   19.3000  146.8700      12.0        58       884        92
VIS    2025250    183200   19.2900  146.8600      12.6        58       921        92
VIS    2025250    183200   19.2800  146.8100      13.1        50       950        97
VIS    2025250    183200   19.2800  146.8000      13.2        50       938        96
VIS    2025250    183200   19.3000  146.7600      11.6        81       722        97
VIS    2025250    183200   19.2800  146.7600      11.9        78       722        96
VIS    2025250    183200   19.2900  146.7200      12.4        82       759       100
VIS    2025250    183200   19.3000  146.7000      13.5        70       739        96
VIS    2025250    183200   19.2800  149.1700       9.9        43       996        96
VIS    2025250    183200   19.2800  149.1300       8.8        41       996        92
VIS    2025250    183200   19.3000  149.1100       9.0        48       991        94
VIS    2025250    183200   19.3000  149.0900       9.2        49       969        94
VIS    2025250    183200   19.2800  149.0500       9.7        45       948        96
VIS    2025250    183200   19.2900  149.0300       9.9        47       927        96
VIS    2025250    183200   19.3000  149.0000       9.7        48       927        98
VIS    2025250    183200   19.2800  148.9800       9.8        46       940        98
VIS    2025250    183200   19.2900  148.9600       9.8        51       940        97
VIS    2025250    183200   19.3000  148.9300       9.5        54       934        97
VIS    2025250    183200   19.2800  148.9000      10.2        51       934        97
VIS    2025250    183200   19.2900  148.8800      10.2        50       934        97
VIS    2025250    183200   19.2900  148.8500      10.0        47       940        97
VIS    2025250    183200   19.2700  148.2100       8.6        50       905        92
VIS    2025250    183200   19.2900  148.1700       9.2        58       950        91
VIS    2025250    183200   19.2700  148.1700       9.6        58       950        94
VIS    2025250    183200   19.2700  148.1400       9.8        51       974        92
VIS    2025250    183200   19.2800  148.1000      10.3        45       940        99
VIS    2025250    183200   19.2800  148.0900      10.6        45       940        99
VIS    2025250    183200   19.2700  148.0500      11.2        47       919        98
VIS    2025250    183200   19.2700  148.0400      10.9        47       919        98
VIS    2025250    183200   19.2800  148.0200      11.2        47       919        98
VIS    2025250    183200   19.2700  147.9800      10.9        46       879        92
VIS    2025250    183200   19.2800  147.9300       9.2        59       910        92
VIS    2025250    183200   19.2800  147.9000       9.4        71       906        90
VIS    2025250    183200   19.2800  147.8800      10.1        76       866        97
VIS    2025250    183200   19.2600  147.8600      10.6        75       866        98
VIS    2025250    183200   19.2600  147.8400      10.6        70       896        97
VIS    2025250    183200   19.2700  147.8000      11.5        53       915        98
VIS    2025250    183200   19.2700  147.7700      11.7        47       928        96
VIS    2025250    183200   19.2700  147.7500      11.3        46       910        94
VIS    2025250    183200   19.2800  147.7400      11.0        44       910        92
VIS    2025250    183200   19.2800  147.6900      10.0        49       877        91
VIS    2025250    183200   19.2800  147.6500      11.3        45       866        93
VIS    2025250    183200   19.2800  147.6100      11.2        48       856        92
VIS    2025250    183200   19.2800  147.5600      10.8        49       848        90
VIS    2025250    183200   19.2600  147.5300      11.3        58       856        92
VIS    2025250    183200   19.2600  147.5000      10.3        57       862        90
VIS    2025250    183200   19.2700  147.5000      10.1        56       856        92
VIS    2025250    183200   19.2700  147.4700      10.2        62       853        95
VIS    2025250    183200   19.2600  147.4400      10.7        62       815        91
VIS    2025250    183200   19.2600  147.4100      10.8        57       857        95
VIS    2025250    183200   19.2600  147.3900      10.9        56       948        96
VIS    2025250    183200   19.2800  147.3600      11.1        58       968        98
VIS    2025250    183200   19.2700  147.3300      11.2        56       943        96
VIS    2025250    183200   19.2500  147.1100      11.5        58       725        90
VIS    2025250    183200   19.2700  146.9400      13.1        50       876        93
VIS    2025250    183200   19.2600  146.8700      13.3        51       950        96
VIS    2025250    183200   19.2600  146.8400      14.2        44       976        98
VIS    2025250    183200   19.2700  146.8100      13.4        48       938        96
VIS    2025250    183200   19.2700  146.7300      11.8        81       739        95
VIS    2025250    183200   19.2700  146.7000      11.3        76       739        97
VIS    2025250    183200   19.2700  149.1800      10.1        43       996        92
VIS    2025250    183200   19.2700  149.1300       9.4        41       996        92
VIS    2025250    183200   19.2500  149.0800       8.8        37       995        99
VIS    2025250    183200   19.2500  149.0800       8.9        38       995        99
VIS    2025250    183200   19.2600  149.0400       9.5        43       948        98
VIS    2025250    183200   19.2700  149.0200       9.6        45       927        97
VIS    2025250    183200   19.2700  148.9800       9.8        46       935        98
VIS    2025250    183200   19.2700  148.9800       9.8        46       935        97
VIS    2025250    183200   19.2500  148.9500       9.9        49       950        94
VIS    2025250    183200   19.2600  148.9200      10.1        50       954        92
VIS    2025250    183200   19.2700  148.9000      10.2        50       948        94
VIS    2025250    183200   19.2500  148.8700      10.4        46       942        96
VIS    2025250    183200   19.2600  148.8500      10.3        46       942        96
VIS    2025250    183200   19.2700  148.7600       9.3        44       989        90
VIS    2025250    183200   19.2400  148.2100      10.3        42       905        98
VIS    2025250    183200   19.2600  148.2100       9.3        48       905        95
VIS    2025250    183200   19.2400  148.1600       9.1        60       928        97
VIS    2025250    183200   19.2400  148.1400       9.3        57       942        92
VIS    2025250    183200   19.2600  148.1300       9.4        54       964        92
VIS    2025250    183200   19.2400  148.0900      10.8        42       919       100
VIS    2025250    183200   19.2600  148.0700      11.1        47       928        99
VIS    2025250    183200   19.2600  148.0400      10.7        49       919        98
VIS    2025250    183200   19.2500  148.0300      10.6        49       910        98
VIS    2025250    183200   19.2500  147.9900      10.5        51       875        96
VIS    2025250    183200   19.2400  147.9700      10.2        53       876        99
VIS    2025250    183200   19.2500  147.9500       9.7        55       880        93
VIS    2025250    183200   19.2400  147.9100       9.5        64       903        97
VIS    2025250    183200   19.2400  147.8900      10.2        68       902        94
VIS    2025250    183200   19.2600  147.8600      10.6        73       867        98
VIS    2025250    183200   19.2500  147.8600      10.7        67       896        98
VIS    2025250    183200   19.2500  147.8100      11.2        53       914       100
VIS    2025250    183200   19.2400  147.7900      11.5        49       915        99
VIS    2025250    183200   19.2400  147.7700      11.0        51       913        99
VIS    2025250    183200   19.2600  147.7400      11.0        48       910        96
VIS    2025250    183200   19.2500  147.6600      10.2        51       844        90
VIS    2025250    183200   19.2500  147.6100       9.7        55       841        91
VIS    2025250    183200   19.2500  147.5900       9.7        53       838        90
VIS    2025250    183200   19.2600  147.5800      10.0        53       842        90
VIS    2025250    183200   19.2400  147.5400      10.8        63       856        91
VIS    2025250    183200   19.2500  147.5300      11.4        58       862        93
VIS    2025250    183200   19.2400  147.5100      11.5        62       881        96
VIS    2025250    183200   19.2400  147.4700      10.3        71       832        95
VIS    2025250    183200   19.2500  147.4200      10.8        58       848        95
VIS    2025250    183200   19.2400  147.4100      11.1        56       848        98
VIS    2025250    183200   19.2300  147.3900      11.1        55       952        98
VIS    2025250    183200   19.2400  147.3500      11.5        49       952        98
VIS    2025250    183200   19.2400  147.3200      11.0        52       917        95
VIS    2025250    183200   19.2300  147.2300      10.8        53       725        93
VIS    2025250    183200   19.2400  147.1900      11.0        50       725        93
VIS    2025250    183200   19.2300  147.1900      11.0        51       725        93
VIS    2025250    183200   19.2400  147.1200      11.7        61       727        93
VIS    2025250    183200   19.2400  147.1100      11.5        58       727        90
VIS    2025250    183200   19.2500  147.0200      11.7        54       753        93
VIS    2025250    183200   19.2500  147.0200      11.9        53       788        93
VIS    2025250    183200   19.2300  146.9700      14.4        47       898        97
VIS    2025250    183200   19.2400  146.9700      14.5        48       893        97
VIS    2025250    183200   19.2300  146.9400      12.6        48       873        97
VIS    2025250    183200   19.2300  146.8500      14.5        44       950        94
VIS    2025250    183200   19.2500  146.8200      14.4        42       938        90
VIS    2025250    183200   19.2500  146.8100      14.7        42       938        94
VIS    2025250    183200   19.2500  149.0800       8.9        38       995        99
VIS    2025250    183200   19.2300  149.0400       9.2        45       983        96
VIS    2025250    183200   19.2400  149.0200       9.1        44       965        98
VIS    2025250    183200   19.2300  148.9900       9.3        47       952        98
VIS    2025250    183200   19.2400  148.9700       9.9        49       929        98
VIS    2025250    183200   19.2500  148.9500      10.0        50       950        93
VIS    2025250    183200   19.2300  148.9200      10.3        45       951        94
VIS    2025250    183200   19.2400  148.9000      10.6        46       953        94
VIS    2025250    183200   19.2400  148.8700      10.5        46       938        96
VIS    2025250    183200   19.2300  148.8400      10.2        49       952        93
VIS    2025250    183200   19.2400  148.8300      10.3        50       953        92
VIS    2025250    183200   19.2300  148.8000       9.4        49       976        94
VIS    2025250    183200   19.2200  148.5500       9.2        50       980        91
VIS    2025250    183200   19.2300  148.1800       9.3        52       905        98
VIS    2025250    183200   19.2400  148.1500       9.1        60       926        94
VIS    2025250    183200   19.2300  148.1400       9.0        57       926        93
VIS    2025250    183200   19.2200  148.1000      10.1        44       918        99
VIS    2025250    183200   19.2400  148.0900      10.8        39       919        99
VIS    2025250    183200   19.2400  148.0700      10.5        46       916        99
VIS    2025250    183200   19.2300  148.0400      10.2        50       895        97
VIS    2025250    183200   19.2100  148.0000      10.1        50       883        97
VIS    2025250    183200   19.2300  147.9900      10.3        51       873        99
VIS    2025250    183200   19.2200  147.9700      10.3        54       873        98
VIS    2025250    183200   19.2200  147.9300      11.2        54       874        98
VIS    2025250    183200   19.2200  147.9200      11.0        53       883        99
VIS    2025250    183200   19.2200  147.8800      11.0        58       902        96
VIS    2025250    183200   19.2300  147.8600      10.8        62       902        94
VIS    2025250    183200   19.2100  147.8300      11.2        43       929        99
VIS    2025250    183200   19.2300  147.8300      11.3        45       929        99
VIS    2025250    183200   19.2300  147.8000      11.4        46       915       100
VIS    2025250    183200   19.2200  147.7700      10.6        49       894        99
VIS    2025250    183200   19.2300  147.7400      10.9        50       890        94
VIS    2025250    183200   19.2300  147.7200      10.0        50       882        92
VIS    2025250    183200   19.2200  147.6800       8.8        69       832        92
VIS    2025250    183200   19.2300  147.6600       9.2        67       828        92
VIS    2025250    183200   19.2200  147.6500       9.2        70       816        93
VIS    2025250    183200   19.2300  147.6200       8.4        66       795        91
VIS    2025250    183200   19.2200  147.5800       9.7        59       807        91
VIS    2025250    183200   19.2100  147.5600      10.4        59       838        91
VIS    2025250    183200   19.2200  147.5500      10.6        62       866        92
VIS    2025250    183200   19.2300  147.5200      11.2        62       884        93
VIS    2025250    183200   19.2100  147.4900      10.2        65       850        95
VIS    2025250    183200   19.2200  147.4700      10.3        67       832        94
VIS    2025250    183200   19.2200  147.4300      11.2        55       796        92
VIS    2025250    183200   19.2100  147.4100      12.0        46       834        94
VIS    2025250    183200   19.2200  147.4000      11.5        53       857        99
VIS    2025250    183200   19.2300  147.3800      11.2        55       952        95
VIS    2025250    183200   19.2200  147.3400      11.6        49       928        98
VIS    2025250    183200   19.2100  147.3100      11.5        49       911        98
VIS    2025250    183200   19.2200  147.3000      10.6        56       844        92
VIS    2025250    183200   19.2100  147.2100      10.9        53       723        94
VIS    2025250    183200   19.2100  147.1900      11.0        54       724        94
VIS    2025250    183200   19.2100  147.1800      11.0        56       724        94
VIS    2025250    183200   19.2200  147.1300      11.2        62       733        90
VIS    2025250    183200   19.2000  147.0500      11.7        61       735        92
VIS    2025250    183200   19.2100  147.0200      12.6        54       755        92
VIS    2025250    183200   19.2200  147.0000      13.4        51       867        97
VIS    2025250    183200   19.2100  146.9700      14.0        49       901        97
VIS    2025250    183200   19.2100  146.9500      13.7        48       894        97
VIS    2025250    183200   19.2100  146.9100      11.5        50       864        96
VIS    2025250    183200   19.2100  146.9100      11.1        51       865        93
VIS    2025250    183200   19.2100  146.8400      14.7        47       948        96
VIS    2025250    183200   19.2100  146.8400      15.2        47       948        95
VIS    2025250    183200   19.2300  151.3500       6.5        80       994        90
VIS    2025250    183200   19.2100  149.0400       9.8        45       985        95
VIS    2025250    183200   19.2100  149.0200       9.5        44       976        95
VIS    2025250    183200   19.2000  148.9900       9.3        47       962        97
VIS    2025250    183200   19.2000  148.9700       9.9        51       962        93
VIS    2025250    183200   19.2100  148.9300      10.3        48       955        93
VIS    2025250    183200   19.2200  148.9100      10.2        43       950        95
VIS    2025250    183200   19.2200  148.8500      10.0        46       943        97
VIS    2025250    183200   19.2000  148.8300       9.5        47       964        96
VIS    2025250    183200   19.2000  148.8000       9.0        47       976        96
VIS    2025250    183200   19.2100  148.8000       8.9        48       976        96
VIS    2025250    183200   19.2100  148.5900       9.4        53       980        90
VIS    2025250    183200   19.2200  148.5400       8.8        47       971        96
VIS    2025250    183200   19.1900  148.1800       9.0        52       892        99
VIS    2025250    183200   19.1900  148.1700       9.0        52       913        98
VIS    2025250    183200   19.2000  148.1300       8.9        53       923        96
VIS    2025250    183200   19.2100  148.1000      10.1        44       918        99
VIS    2025250    183200   19.2000  148.1000      10.3        43       918        99
VIS    2025250    183200   19.2100  148.0500       9.8        52       892        97
VIS    2025250    183200   19.2000  148.0400       9.9        49       890        98
VIS    2025250    183200   19.2100  148.0100      10.2        49       884        97
VIS    2025250    183200   19.1900  147.9900       9.5        54       890        94
VIS    2025250    183200   19.1900  147.9700       9.6        54       874        95
VIS    2025250    183200   19.1900  147.9300      11.5        48       874        97
VIS    2025250    183200   19.1900  147.9200      11.4        47       874        98
VIS    2025250    183200   19.2100  147.9000      10.7        49       887        99
VIS    2025250    183200   19.2000  147.8600      11.0        52       902        97
VIS    2025250    183200   19.2100  147.8500      11.2        52       904        97
VIS    2025250    183200   19.1900  147.8200      10.8        38       929        99
VIS    2025250    183200   19.1900  147.7800      11.1        43       896        99
VIS    2025250    183200   19.1900  147.7700      11.1        43       890        98
VIS    2025250    183200   19.1900  147.7500      11.0        45       882        93
VIS    2025250    183200   19.1900  147.7100      10.3        54       868        97
VIS    2025250    183200   19.2000  147.6900       9.4        66       848        96
VIS    2025250    183200   19.1900  147.6600       9.6        70       832        96
VIS    2025250    183200   19.2000  147.6400       8.7        75       793        94
VIS    2025250    183200   19.1900  147.6000       8.9        67       762        92
VIS    2025250    183200   19.1900  147.5900       9.2        64       760        92
VIS    2025250    183200   19.1900  147.5600      10.8        55       808        93
VIS    2025250    183200   19.1900  147.5300      10.6        60       870        96
VIS    2025250    183200   19.1900  147.5100      10.1        65       869        95
VIS    2025250    183200   19.2000  147.4800      10.0        66       832        95
VIS    2025250    183200   19.1800  147.4800       9.6        67       773        96
VIS    2025250    183200   19.1900  147.4400      11.1        52       774        90
VIS    2025250    183200   19.2000  147.4100      12.2        45       836        93
VIS    2025250    183200   19.2000  147.4000      12.4        45       846        94
VIS    2025250    183200   19.1800  147.3700      12.0        48       933        99
VIS    2025250    183200   19.2000  147.3300      11.8        50       917        98
VIS    2025250    183200   19.2000  147.3100      11.4        50       898        98
VIS    2025250    183200   19.1900  147.3000      11.3        53       890        98
VIS    2025250    183200   19.1800  147.2500      10.1        63       735        92
VIS    2025250    183200   19.2000  147.2100      10.8        54       721        93
VIS    2025250    183200   19.2000  147.1900      11.1        56       723        92
VIS    2025250    183200   19.1900  147.1800      11.3        57       723        92
VIS    2025250    183200   19.1900  147.1100      10.6        58       736        92
VIS    2025250    183200   19.1900  147.1000      10.5        60       736        94
VIS    2025250    183200   19.1900  147.0700      10.9        59       737        93
VIS    2025250    183200   19.2000  147.0500      12.0        59       735        93
VIS    2025250    183200   19.1800  147.0200      13.4        52       833        96
VIS    2025250    183200   19.1900  146.9900      13.7        49       901        96
VIS    2025250    183200   19.2000  146.9800      13.7        49       902        96
VIS    2025250    183200   19.2000  146.9500      13.3        47       881        97
VIS    2025250    183200   19.1800  146.9100      11.9        52       851        97
VIS    2025250    183200   19.1900  146.9100      11.2        53       864        95
VIS    2025250    183200   19.1800  146.8300      15.7        57       846        94
VIS    2025250    183200   19.2000  149.0200       9.7        45       976        93
VIS    2025250    183200   19.2000  149.0000       9.4        46       962        97
VIS    2025250    183200   19.1800  148.9400       9.8        48       978        91
VIS    2025250    183200   19.1800  148.9200       9.2        45       948        97
VIS    2025250    183200   19.1800  148.8900       9.4        41       939        98
VIS    2025250    183200   19.1800  148.8800       9.4        40       942        99
VIS    2025250    183200   19.1900  148.8500       9.4        41       961        99
VIS    2025250    183200   19.1700  148.8200       9.4        48       963        95
VIS    2025250    183200   19.1700  148.8100       9.2        47       963        95
VIS    2025250    183200   19.1800  148.5800       8.9        53       958        90
VIS    2025250    183200   19.1700  148.5600       8.9        54       952        92
VIS    2025250    183200   19.1700  148.2300      10.9        26       981        98
VIS    2025250    183200   19.1700  148.1600       8.8        53       906        98
VIS    2025250    183200   19.1700  148.1500       8.8        51       913        98
VIS    2025250    183200   19.1700  148.1200       9.3        44       918        99
VIS    2025250    183200   19.1900  148.0900      10.6        44       918       100
VIS    2025250    183200   19.1700  148.0600      10.6        45       890        99
VIS    2025250    183200   19.1700  148.0500      10.7        45       888        98
VIS    2025250    183200   19.1700  148.0100      10.0        52       923        96
VIS    2025250    183200   19.1800  147.9900       9.0        59       890        92
VIS    2025250    183200   19.1600  147.9600       9.1        63       874        95
VIS    2025250    183200   19.1800  147.9500       9.8        55       872        99
VIS    2025250    183200   19.1700  147.9200      10.9        45       881        98
VIS    2025250    183200   19.1600  147.9100      10.9        45       883        98
VIS    2025250    183200   19.1600  147.8600      11.1        45       884        98
VIS    2025250    183200   19.1600  147.8400      10.7        42       898        99
VIS    2025250    183200   19.1600  147.8300      10.8        40       906        98
VIS    2025250    183200   19.1600  147.8100      11.1        39       918        99
VIS    2025250    183200   19.1800  147.7700      11.2        43       890        98
VIS    2025250    183200   19.1800  147.7400      11.0        46       882        94
VIS    2025250    183200   19.1800  147.7300      10.8        47       882        95
VIS    2025250    183200   19.1800  147.6900      10.1        59       848        98
VIS    2025250    183200   19.1600  147.6600       9.8        61       831        91
VIS    2025250    183200   19.1700  147.6300       9.2        66       799        90
VIS    2025250    183200   19.1700  147.6100       9.4        62       799        91
VIS    2025250    183200   19.1700  147.5800      10.1        58       778        92
VIS    2025250    183200   19.1800  147.5500      11.4        53       808        94
VIS    2025250    183200   19.1700  147.5200      10.9        63       865        96
VIS    2025250    183200   19.1800  147.5000       9.6        69       824        93
VIS    2025250    183200   19.1800  147.4700       9.7        66       756        96
VIS    2025250    183200   19.1600  147.4500      10.6        58       764        96
VIS    2025250    183200   19.1600  147.4300      11.9        49       795        92
VIS    2025250    183200   19.1600  147.4000      12.3        45       884        95
VIS    2025250    183200   19.1700  147.3800      11.9        45       910        97
VIS    2025250    183200   19.1600  147.3600      11.8        47       896        96
VIS    2025250    183200   19.1600  147.3400      11.6        47       896        96
VIS    2025250    183200   19.1700  147.3100      11.1        51       888        97
VIS    2025250    183200   19.1700  147.2800      10.8        59       801        93
VIS    2025250    183200   19.1600  147.2500       9.9        57       722        95
VIS    2025250    183200   19.1700  147.2300      10.2        57       716        94
VIS    2025250    183200   19.1600  147.2000      11.3        53       715        91
VIS    2025250    183200   19.1700  147.1800      11.5        54       722        91
VIS    2025250    183200   19.1700  147.1400      11.7        53       736        90
VIS    2025250    183200   19.1700  147.1000      10.9        58       736        92
VIS    2025250    183200   19.1800  147.0900      10.9        60       736        95
VIS    2025250    183200   19.1600  147.0500      12.4        50       751        90
VIS    2025250    183200   19.1600  147.0300      13.4        50       802        92
VIS    2025250    183200   19.1600  147.0100      13.9        50       895        97
VIS    2025250    183200   19.1600  146.9900      14.0        49       937        96
VIS    2025250    183200   19.1600  146.9500      12.7        46       851        92
VIS    2025250    183200   19.1700  146.9200      12.1        51       851        96
VIS    2025250    183200   19.1700  146.9100      12.6        52       851        97
VIS    2025250    183200   19.1500  146.8900      14.2        53       940        97
VIS    2025250    183200   19.1600  146.8500      14.5        66       846        96
VIS    2025250    183200   19.1500  149.0400       9.5        42       991        96
VIS    2025250    183200   19.1600  149.0300       9.8        44       991        95
VIS    2025250    183200   19.1600  149.0000       9.6        44       977        95
VIS    2025250    183200   19.1700  148.9200       9.2        46       972        96
VIS    2025250    183200   19.1700  148.9100       9.1        45       948        98
VIS    2025250    183200   19.1700  148.8700       9.4        40       942        99
VIS    2025250    183200   19.1500  148.8600       9.8        44       963        95
VIS    2025250    183200   19.1600  148.8200       9.5        47       963        95
VIS    2025250    183200   19.1700  148.8000       9.3        47       963        95
VIS    2025250    183200   19.1500  148.7700       8.8        47       967        90
VIS    2025250    183200   19.1700  148.5800       9.1        50       970        90
VIS    2025250    183200   19.1500  148.1800       7.9        56       857        94
VIS    2025250    183200   19.1600  148.1500       8.9        50       913        98
VIS    2025250    183200   19.1400  148.1300       9.7        42       863        96
VIS    2025250    183200   19.1500  148.1000      10.2        41       910        99
VIS    2025250    183200   19.1600  148.0800      10.9        42       908        95
VIS    2025250    183200   19.1600  148.0500      10.7        44       887        97
VIS    2025250    183200   19.1500  148.0200      11.4        44       895        96
VIS    2025250    183200   19.1600  148.0000      10.1        57       923        94
VIS    2025250    183200   19.1500  147.9900       9.8        60       923        90
VIS    2025250    183200   19.1600  147.9600       9.1        64       874        94
VIS    2025250    183200   19.1400  147.9200      10.3        49       884        94
VIS    2025250    183200   19.1600  147.8900      11.0        44       884        98
VIS    2025250    183200   19.1500  147.8800      11.3        40       891        95
VIS    2025250    183200   19.1500  147.8500      11.2        40       884        96
VIS    2025250    183200   19.1600  147.8200      10.9        39       906        98
VIS    2025250    183200   19.1500  147.8000      11.1        40       906        98
VIS    2025250    183200   19.1400  147.7900      11.1        42       900        96
VIS    2025250    183200   19.1500  147.7600      11.3        47       882        96
VIS    2025250    183200   19.1600  147.7400      11.3        48       877        95
VIS    2025250    183200   19.1500  147.7100      10.4        56       857        97
VIS    2025250    183200   19.1400  147.6800       9.5        62       822        92
VIS    2025250    183200   19.1400  147.5900      10.1        53       818        90
VIS    2025250    183200   19.1500  147.5500      11.9        53       861        97
VIS    2025250    183200   19.1600  147.5300      11.7        58       861        98
VIS    2025250    183200   19.1500  147.5000      10.1        70       787        95
VIS    2025250    183200   19.1400  147.4700       9.2        60       746        94
VIS    2025250    183200   19.1400  147.4500      10.0        54       746        93
VIS    2025250    183200   19.1500  147.4200      12.0        47       802        92
VIS    2025250    183200   19.1300  147.4000      12.1        46       891        97
VIS    2025250    183200   19.1500  147.3800      11.6        45       891        96
VIS    2025250    183200   19.1400  147.3500      11.7        46       885        96
VIS    2025250    183200   19.1400  147.3400      11.7        46       882        95
VIS    2025250    183200   19.1500  147.3100      11.0        50       855        96
VIS    2025250    183200   19.1400  147.2800      10.7        56       792        93
VIS    2025250    183200   19.1400  147.2600      10.5        56       735        95
VIS    2025250    183200   19.1500  147.2400       9.9        56       716        92
VIS    2025250    183200   19.1400  147.2000      11.4        49       715        91
VIS    2025250    183200   19.1400  147.1900      11.7        50       716        90
VIS    2025250    183200   19.1400  147.0000      14.0        48       894        97
VIS    2025250    183200   19.1500  146.9900      14.0        48       895        97
VIS    2025250    183200   19.1300  146.9700      13.5        49       823        91
VIS    2025250    183200   19.1300  146.9300      13.2        51       866        95
VIS    2025250    183200   19.1400  146.9100      13.8        51       866        97
VIS    2025250    183200   19.1300  146.8900      15.5        50       898        96
VIS    2025250    183200   19.1400  146.8600      14.3        71       846        96
VIS    2025250    183200   19.1200  145.0000      12.6       109       193        92
VIS    2025250    183200   19.1200  144.9800      12.3       122       193        97
VIS    2025250    183200   19.1400  149.0400       9.4        39       991        97
VIS    2025250    183200   19.1400  149.0300       9.5        40       991        96
VIS    2025250    183200   19.1400  149.0000       9.2        42       978        96
VIS    2025250    183200   19.1400  148.9000       9.2        48       974        91
VIS    2025250    183200   19.1500  148.8700       9.6        45       966        94
VIS    2025250    183200   19.1300  148.8500       9.7        48       963        92
VIS    2025250    183200   19.1300  148.8200       9.6        47       927        95
VIS    2025250    183200   19.1400  148.8000       9.2        46       954        96
VIS    2025250    183200   19.1400  148.7700       8.7        48       967        90
VIS    2025250    183200   19.1400  148.5500       9.5        49       966        90
VIS    2025250    183200   19.1300  148.5100      10.1        46       965        91
VIS    2025250    183200   19.1300  148.1700       8.6        49       853        92
VIS    2025250    183200   19.1200  148.1600       9.1        47       853        92
VIS    2025250    183200   19.1400  148.1300      10.0        42       856        95
VIS    2025250    183200   19.1300  148.1100      10.0        45       855        94
VIS    2025250    183200   19.1300  148.0800       9.8        47       853        92
VIS    2025250    183200   19.1400  148.0400      11.5        43       879        92
VIS    2025250    183200   19.1300  148.0200      13.1        41       890        92
VIS    2025250    183200   19.1200  148.0000      13.0        45       913        96
VIS    2025250    183200   19.1200  147.9900      12.3        47       919        96
VIS    2025250    183200   19.1200  147.9600      10.8        55       904        93
VIS    2025250    183200   19.1200  147.9300      10.2        54       900        91
VIS    2025250    183200   19.1300  147.9000      10.5        45       908        95
VIS    2025250    183200   19.1300  147.8700      11.4        39       891        94
VIS    2025250    183200   19.1100  147.8500      11.6        42       902        90
VIS    2025250    183200   19.1300  147.7900      10.8        43       900        94
VIS    2025250    183200   19.1300  147.7900      10.6        44       900        95
VIS    2025250    183200   19.1200  147.7400      11.1        46       865        94
VIS    2025250    183200   19.1300  147.7200      11.2        49       860        96
VIS    2025250    183200   19.1200  147.7000      10.2        54       844        96
VIS    2025250    183200   19.1100  147.6700       8.8        60       810        91
VIS    2025250    183200   19.1100  147.5900      10.3        60       824        91
VIS    2025250    183200   19.1300  147.5500      11.6        54       861        94
VIS    2025250    183200   19.1200  147.5300      11.0        56       852        92
VIS    2025250    183200   19.1200  147.5100      10.4        59       797        92
VIS    2025250    183200   19.1100  147.4800       9.8        51       780        90
VIS    2025250    183200   19.1300  147.4500      10.5        50       768        92
VIS    2025250    183200   19.1200  147.4400      11.0        49       802        93
VIS    2025250    183200   19.1100  147.4100      12.1        47       885        95
VIS    2025250    183200   19.1300  147.3900      12.2        45       891        95
VIS    2025250    183200   19.1200  147.3500      12.1        47       881        96
VIS    2025250    183200   19.1300  147.3400      11.9        46       881        95
VIS    2025250    183200   19.1300  147.3100      11.4        49       855        94
VIS    2025250    183200   19.1300  147.2800      10.8        55       792        93
VIS    2025250    183200   19.1100  147.2600      10.6        54       732        90
VIS    2025250    183200   19.1300  147.2200      10.5        50       712        91
VIS    2025250    183200   19.1300  147.2000      11.3        49       715        90
VIS    2025250    183200   19.1200  147.1900      11.4        49       715        90
VIS    2025250    183200   19.1300  147.1500      11.3        56       730        92
VIS    2025250    183200   19.1100  147.1400      11.2        59       730        94
VIS    2025250    183200   19.1200  147.0200      13.5        50       838        90
VIS    2025250    183200   19.1100  146.9800      13.4        50       803        91
VIS    2025250    183200   19.1100  146.9700      13.4        50       807        91
VIS    2025250    183200   19.1000  146.9100      13.3        50       916        90
VIS    2025250    183200   19.1100  146.9000      13.9        49       916        91
VIS    2025250    183200   19.0900  144.9900      13.3       116       192        93
VIS    2025250    183200   19.1100  144.9600      13.8       124       193        90
VIS    2025250    183200   19.1000  149.0300       9.2        42       994        96
VIS    2025250    183200   19.1000  149.0200       9.1        42       994        97
VIS    2025250    183200   19.1200  148.8600       9.6        48       966        93
VIS    2025250    183200   19.1000  148.8300       9.0        46       916        97
VIS    2025250    183200   19.1100  148.8000       9.0        47       917        98
VIS    2025250    183200   19.1100  148.7800       8.8        52       926        93
VIS    2025250    183200   19.1000  148.7700       8.9        49       919        97
VIS    2025250    183200   19.1000  148.7300       8.5        50       966        91
VIS    2025250    183200   19.1000  148.7100       8.5        49       969        93
VIS    2025250    183200   19.1200  148.5400       9.6        49       966        92
VIS    2025250    183200   19.1100  148.2400       8.1        57       982        91
VIS    2025250    183200   19.0900  148.2300       8.6        51       982        91
VIS    2025250    183200   19.1100  148.1400      10.0        43       854        92
VIS    2025250    183200   19.1100  148.1300      10.2        42       855        93
VIS    2025250    183200   19.1100  148.0900       9.5        47       854        92
VIS    2025250    183200   19.1000  148.0600      10.0        50       845        94
VIS    2025250    183200   19.0900  148.0600      10.4        50       845        95
VIS    2025250    183200   19.0900  147.9900      13.0        44       896        95
VIS    2025250    183200   19.0900  147.9800      12.6        45       899        96
VIS    2025250    183200   19.1100  147.9600      11.0        53       904        94
VIS    2025250    183200   19.0900  147.9100      10.5        54       924        92
VIS    2025250    183200   19.0900  147.9000      10.5        51       924        94
VIS    2025250    183200   19.1000  147.8900      10.8        45       914        96
VIS    2025250    183200   19.1100  147.8400      11.5        43       911        90
VIS    2025250    183200   19.1000  147.8300      11.1        46       916        90
VIS    2025250    183200   19.0900  147.7900       9.9        51       898        90
VIS    2025250    183200   19.0900  147.7600      10.1        50       870        96
VIS    2025250    183200   19.0900  147.7300      11.2        50       865        96
VIS    2025250    183200   19.1000  147.7000       9.9        50       857        90
VIS    2025250    183200   19.0900  147.6500       9.6        52       791        90
VIS    2025250    183200   19.0900  147.6400       9.7        54       790        91
VIS    2025250    183200   19.1000  147.6000      10.4        66       828        90
VIS    2025250    183200   19.1100  147.5900      10.4        62       824        91
VIS    2025250    183200   19.1000  147.5500      10.6        52       860        90
VIS    2025250    183200   19.0900  147.5200      10.2        56       834        91
VIS    2025250    183200   19.1000  147.4200      12.0        48       877        92
VIS    2025250    183200   19.1000  147.4100      12.1        48       880        92
VIS    2025250    183200   19.1000  147.3900      12.3        47       881        92
VIS    2025250    183200   19.0900  147.3700      12.0        52       852        92
VIS    2025250    183200   19.1000  147.3300      11.6        51       851        95
VIS    2025250    183200   19.0900  147.3000      10.3        55       747        90
VIS    2025250    183200   19.1000  147.2900      10.3        55       747        90
VIS    2025250    183200   19.0900  147.2600      10.0        57       732        92
VIS    2025250    183200   19.0800  147.1800      11.2        52       721        92
VIS    2025250    183200   19.0900  147.1500      11.2        58       725        93
VIS    2025250    183200   19.0900  147.1300      11.4        59       730        94
VIS    2025250    183200   19.0800  147.1100      12.1        53       739        93
VIS    2025250    183200   19.0900  147.0900      13.1        48       745        90
VIS    2025250    183200   19.0800  147.0000      13.5        55       797        93
VIS    2025250    183200   19.0900  146.9800      13.5        51       803        91
VIS    2025250    183200   19.1000  146.9700      13.5        51       803        92
VIS    2025250    183200   19.1000  146.9300      12.7        54       897        93
VIS    2025250    183200   19.1000  146.9200      12.9        53       916        94
VIS    2025250    183200   19.0800  146.8800      14.3        55       937        95
VIS    2025250    183200   19.0800  146.8500      14.3        61       800        90
VIS    2025250    183200   19.1000  146.8500      13.0        68       703        96
VIS    2025250    183200   19.1000  149.0300       9.1        43       994        95
VIS    2025250    183200   19.0900  149.0100       8.7        42       978        97
VIS    2025250    183200   19.0800  148.9700       8.6        37       980        99
VIS    2025250    183200   19.0900  148.9300       8.9        38       990        96
VIS    2025250    183200   19.0900  148.8900       9.8        42       982        97
VIS    2025250    183200   19.0800  148.8700       9.4        42       966        98
VIS    2025250    183200   19.0900  148.8400       9.1        46       921        98
VIS    2025250    183200   19.0800  148.8100       9.2        42       916        95
VIS    2025250    183200   19.0800  148.7900       9.3        40       919        94
VIS    2025250    183200   19.0800  148.7800       9.4        40       919        95
VIS    2025250    183200   19.0900  148.7400       8.7        50       954        92
VIS    2025250    183200   19.0800  148.7100       8.5        46       969        95
VIS    2025250    183200   19.0900  148.7100       8.4        49       969        94
VIS    2025250    183200   19.0700  148.2300       9.7        46       999        92
VIS    2025250    183200   19.0700  148.1500      10.7        46       852        91
VIS    2025250    183200   19.0900  148.1100       9.9        44       854        90
VIS    2025250    183200   19.0700  148.0900       9.8        51       850        91
VIS    2025250    183200   19.0900  148.0600      10.4        51       847        96
VIS    2025250    183200   19.0900  148.0500      10.8        49       847        95
VIS    2025250    183200   19.0700  148.0100      11.9        43       891        96
VIS    2025250    183200   19.0900  147.9800      12.4        46       896        97
VIS    2025250    183200   19.0800  147.9800      11.9        48       896        98
VIS    2025250    183200   19.0800  147.9300      10.4        60       892        92
VIS    2025250    183200   19.0800  147.9200      10.4        56       924        92
VIS    2025250    183200   19.0700  147.8900      11.0        50       924        95
VIS    2025250    183200   19.0700  147.8700      11.1        48       916        95
VIS    2025250    183200   19.0600  147.8400      11.0        48       929        95
VIS    2025250    183200   19.0600  147.8300      10.9        50       940        92
VIS    2025250    183200   19.0800  147.7400      10.8        54       868        97
VIS    2025250    183200   19.0800  147.7200      11.3        51       865        96
VIS    2025250    183200   19.0700  147.6900      11.6        43       873        92
VIS    2025250    183200   19.0800  147.6800      10.1        45       859        91
VIS    2025250    183200   19.0800  147.6400      10.0        52       791        91
VIS    2025250    183200   19.0700  147.6300      10.6        55       828        93
VIS    2025250    183200   19.0700  147.6100      10.9        64       847        92
VIS    2025250    183200   19.0800  147.5700      10.8        56       865        91
VIS    2025250    183200   19.0600  147.5400      11.2        59       865        91
VIS    2025250    183200   19.0600  147.5300      11.0        61       848        90
VIS    2025250    183200   19.0600  147.4400      11.7        54       819        91
VIS    2025250    183200   19.0600  147.4100      11.9        52       851        93
VIS    2025250    183200   19.0600  147.4100      11.9        52       851        93
VIS    2025250    183200   19.0600  147.3800      11.1        54       827        91
VIS    2025250    183200   19.0700  147.3400      11.6        56       759        91
VIS    2025250    183200   19.0700  147.3300      11.6        56       759        91
VIS    2025250    183200   19.0800  147.2900       9.7        53       736        90
VIS    2025250    183200   19.0700  147.2800       9.5        52       732        90
VIS    2025250    183200   19.0600  147.1700      10.6        52       722        93
VIS    2025250    183200   19.0700  147.1600      11.0        52       725        93
VIS    2025250    183200   19.0700  147.1300      11.0        62       733        97
VIS    2025250    183200   19.0800  147.1000      12.1        53       740        93
VIS    2025250    183200   19.0600  147.0400      13.1        49       795        90
VIS    2025250    183200   19.0700  147.0200      13.6        52       795        91
VIS    2025250    183200   19.0600  147.0100      13.6        51       808        91
VIS    2025250    183200   19.0700  146.9800      13.9        54       798        93
VIS    2025250    183200   19.0700  146.9600      14.4        56       849        98
VIS    2025250    183200   19.0500  146.9300      14.1        51       886        98
VIS    2025250    183200   19.0600  146.9000      13.6        52       937        98
VIS    2025250    183200   19.0500  146.8700      14.1        63       800        94
VIS    2025250    183200   19.0600  146.8600      14.2        66       800        90
VIS    2025250    183200   19.0400  145.3200      17.5       116       198        90
VIS    2025250    183200   19.0500  145.2800      18.9       113       196        90
VIS    2025250    183200   19.0500  149.0500       9.1        40       997        96
VIS    2025250    183200   19.0700  149.0000       8.7        41       971        94
VIS    2025250    183200   19.0700  148.9700       8.6        37       971        98
VIS    2025250    183200   19.0600  148.9500       9.1        40       971        95
VIS    2025250    183200   19.0500  148.9200       9.3        40       974        96
VIS    2025250    183200   19.0700  148.8900       9.6        38       986        98
VIS    2025250    183200   19.0600  148.8800       9.7        38       986        97
VIS    2025250    183200   19.0700  148.8400       9.0        42       959        97
VIS    2025250    183200   19.0600  148.8100       9.1        37       968        95
VIS    2025250    183200   19.0600  148.7600       9.5        37       965        96
VIS    2025250    183200   19.0600  148.2400      10.0        45       999        94
VIS    2025250    183200   19.0500  148.1400      10.4        55       850        96
VIS    2025250    183200   19.0600  148.1300      10.7        48       850        92
VIS    2025250    183200   19.0600  148.0900       9.7        53       850        94
VIS    2025250    183200   19.0400  148.0600       9.5        59       850        93
VIS    2025250    183200   19.0500  148.0300      10.6        48       851        92
VIS    2025250    183200   19.0400  148.0000      11.3        41       891        95
VIS    2025250    183200   19.0600  148.0000      11.7        44       891        96
VIS    2025250    183200   19.0500  147.9700      10.5        50       892        98
VIS    2025250    183200   19.0500  147.9400      10.2        59       892        95
VIS    2025250    183200   19.0500  147.9200      10.4        53       916        98
VIS    2025250    183200   19.0600  147.8900      11.0        49       924        95
VIS    2025250    183200   19.0500  147.8700      11.0        48       913        95
VIS    2025250    183200   19.0600  147.8500      11.0        47       928        95
VIS    2025250    183200   19.0600  147.8300      11.0        50       931        93
VIS    2025250    183200   19.0600  147.7300      10.9        57       876        95
VIS    2025250    183200   19.0600  147.7200      11.5        53       876        97
VIS    2025250    183200   19.0600  147.6800      11.5        39       877        92
VIS    2025250    183200   19.0600  147.6200      10.7        56       847        94
VIS    2025250    183200   19.0400  147.6000      10.6        53       868        93
VIS    2025250    183200   19.0400  147.5800      10.8        54       870        96
VIS    2025250    183200   19.0600  147.5400      11.3        61       865        90
VIS    2025250    183200   19.0500  147.4600      10.1        70       740        90
VIS    2025250    183200   19.0400  147.3600      12.0        52       754        90
VIS    2025250    183200   19.0500  147.1600      10.5        52       725        93
VIS    2025250    183200   19.0500  147.1400      10.3        56       730        93
VIS    2025250    183200   19.0400  147.1200      10.1        67       733        94
VIS    2025250    183200   19.0400  147.1100      10.6        64       733        93
VIS    2025250    183200   19.0400  146.9900      14.0        52       842        92
VIS    2025250    183200   19.0300  146.9600      13.1        52       841        96
VIS    2025250    183200   19.0300  146.9200      13.4        48       875        97
VIS    2025250    183200   19.0300  146.9100      13.4        49       875        97
VIS    2025250    183200   19.0300  146.8800      13.9        64       745        92
VIS    2025250    183200   19.0100  145.3200      18.2       110       196        93
VIS    2025250    183200   19.0300  149.0700       8.8        38       993        99
VIS    2025250    183200   19.0400  149.0300       9.2        40       982        94
VIS    2025250    183200   19.0300  149.0200       9.2        41       982        95
VIS    2025250    183200   19.0200  148.2100      10.0        31       960        95
VIS    2025250    183200   19.0300  148.1500       9.9        66       850        97
VIS    2025250    183200   19.0200  148.1200      11.0        57       848        97
VIS    2025250    183200   19.0200  148.0900      10.2        59       852        93
VIS    2025250    183200   19.0300  148.0200      10.6        45       851        91
VIS    2025250    183200   19.0300  148.0000      11.6        38       891        94
VIS    2025250    183200   19.0200  147.9800      11.3        38       900        97
VIS    2025250    183200   19.0400  147.9600      10.5        48       892        99
VIS    2025250    183200   19.0200  147.9200      10.7        44       911       100
VIS    2025250    183200   19.0300  147.9000      10.9        46       916        99
VIS    2025250    183200   19.0100  147.8600      10.7        50       900        98
VIS    2025250    183200   19.0200  147.8600      10.8        50       896        98
VIS    2025250    183200   19.0300  147.8300      11.0        51       911        95
VIS    2025250    183200   19.0300  147.8000      11.7        54       906        92
VIS    2025250    183200   19.0200  147.7700      11.6        55       895        92
VIS    2025250    183200   19.0100  147.7600      11.8        54       900        93
VIS    2025250    183200   19.0200  147.7300      11.0        55       890        96
VIS    2025250    183200   19.0300  147.6900      11.8        44       881        95
VIS    2025250    183200   19.0200  147.6200      10.9        46       881        93
VIS    2025250    183200   19.0300  147.6100      10.7        49       874        93
VIS    2025250    183200   19.0300  147.5800      11.0        53       872        96
VIS    2025250    183200   19.0300  147.5400      11.6        59       870        91
VIS    2025250    183200   19.0200  147.5300      10.4        65       842        93
VIS    2025250    183200   19.0300  147.4800       9.5        72       735        90
VIS    2025250    183200   19.0200  147.4500       9.9        74       701        90
VIS    2025250    183200   19.0200  146.9600      12.8        52       798        90
VIS    2025250    183200   19.0100  146.9400      12.0        47       816        91
VIS    2025250    183200   19.0200  146.9200      12.7        48       829        94
VIS    2025250    183200   19.0000  145.3300      17.4       107       197        95
VIS    2025250    183200   19.0100  145.3200      17.9       109       197        94
VIS    2025250    183200   19.0100  144.8400      15.6       134       186        90
VIS    2025250    183200   19.0000  149.0700       8.9        42       983        97
VIS    2025250    183200   19.0200  149.0500       9.1        42       982        97
VIS    2025250    183200   19.0100  149.0300       9.3        41       977        95
VIS    2025250    183200   19.0200  149.0000       9.2        41       980        98
VIS    2025250    183200   19.0100  148.2100      10.3        28       959        93
VIS    2025250    183200   18.9900  148.1300      10.3        48       849        96
VIS    2025250    183200   19.0000  148.1100      10.4        51       848        96
VIS    2025250    183200   19.0100  148.0100      11.6        37       894        95
VIS    2025250    183200   19.0000  148.0000      11.5        35       900        95
VIS    2025250    183200   18.9900  147.9600      10.9        39       900        97
VIS    2025250    183200   19.0000  147.9500      10.8        41       887        98
VIS    2025250    183200   19.0000  147.9300      11.1        39       879        95
VIS    2025250    183200   18.9900  147.8900      10.9        44       900        98
VIS    2025250    183200   19.0000  147.8600      10.4        50       900        97
VIS    2025250    183200   18.9900  147.8400      10.6        47       902        99
VIS    2025250    183200   19.0000  147.8100      11.0        48       911        98
VIS    2025250    183200   18.9900  147.8000      11.3        49       913        95
VIS    2025250    183200   19.0000  147.7600      12.0        51       903        95
VIS    2025250    183200   18.9900  147.7400      11.6        49       900        97
VIS    2025250    183200   18.9900  147.7200      11.0        50       900        95
VIS    2025250    183200   18.9900  147.7000      11.1        49       898        95
VIS    2025250    183200   19.0100  147.6700      11.9        42       888        90
VIS    2025250    183200   19.0000  147.6100      12.0        41       887        92
VIS    2025250    183200   19.0100  147.6100      11.6        43       882        93
VIS    2025250    183200   18.9900  147.5600      11.9        49       869        97
VIS    2025250    183200   18.9900  147.5400      10.2        63       842        94
VIS    2025250    183200   19.0100  147.5100       9.3        71       785        91
VIS    2025250    183200   19.0100  147.4200       9.7        61       701        90
VIS    2025250    183200   18.9800  147.0000      12.6        54       827        91
VIS    2025250    183200   19.0000  146.9700      12.4        58       783        91
VIS    2025250    183200   19.0000  146.9600      12.2        58       783        90
VIS    2025250    183200   18.9600  145.2500      18.9       115       189        90
VIS    2025250    183200   18.9800  149.0700       9.1        42       979        95
VIS    2025250    183200   19.0000  149.0300       9.3        42       960        95
VIS    2025250    183200   18.9800  149.0100       9.8        44       959        92
VIS    2025250    183200   18.9900  148.9200       9.8        39       981        94
VIS    2025250    183200   18.9700  148.2800      11.7        35      1000        93
VIS    2025250    183200   18.9800  148.2300      10.1        42       996        99
VIS    2025250    183200   18.9700  148.2000      10.5        38       956       100
VIS    2025250    183200   18.9700  148.1800      10.1        30       947        98
VIS    2025250    183200   18.9700  148.1300       9.4        47       853        97
VIS    2025250    183200   18.9700  148.1000       9.6        43       855        95
VIS    2025250    183200   18.9700  148.0200       9.9        54       892        92
VIS    2025250    183200   18.9900  148.0000      11.1        36       913        95
VIS    2025250    183200   18.9800  147.9800      10.4        38       913        94
VIS    2025250    183200   18.9900  147.9600      10.8        39       900        96
VIS    2025250    183200   18.9700  147.9300      11.0        37       874        94
VIS    2025250    183200   18.9700  147.8900      10.8        42       894        98
VIS    2025250    183200   18.9700  147.8800      10.6        44       894        98
VIS    2025250    183200   18.9800  147.8500      10.4        48       902        99
VIS    2025250    183200   18.9600  147.8200      11.2        46       933        99
VIS    2025250    183200   18.9700  147.7900      11.5        48       929        96
VIS    2025250    183200   18.9700  147.7700      11.5        50       916        96
VIS    2025250    183200   18.9800  147.7600      11.5        52       903        97
VIS    2025250    183200   18.9700  147.7300      11.1        47       900        96
VIS    2025250    183200   18.9800  147.6900      11.4        45       900        96
VIS    2025250    183200   18.9700  147.6900      11.6        42       901        95
VIS    2025250    183200   18.9700  147.6500      12.4        41       898        93
VIS    2025250    183200   18.9800  147.6400      12.7        41       894        92
VIS    2025250    183200   18.9800  147.6100      13.8        40       887        92
VIS    2025250    183200   18.9800  147.5700      12.6        44       872        94
VIS    2025250    183200   18.9800  147.5400      10.9        57       842        93
VIS    2025250    183200   18.9800  147.5300      10.3        62       832        92
VIS    2025250    183200   18.9600  147.4500      10.8        55       701        90
VIS    2025250    183200   18.9600  147.2300      10.1        51       702        92
VIS    2025250    183200   18.9600  147.2100      10.4        52       702        91
VIS    2025250    183200   18.9800  147.1800      11.1        54       711        90
VIS    2025250    183200   18.9700  147.1500      11.7        54       743        93
VIS    2025250    183200   18.9600  147.1400      12.8        51       745        90
VIS    2025250    183200   18.9800  147.1200      12.1        53       743        91
VIS    2025250    183200   18.9700  146.9800      13.1        49       836        95
VIS    2025250    183200   18.9700  146.9700      13.3        46       845        94
VIS    2025250    183200   18.9600  146.9400      12.7        50       862        94
VIS    2025250    183200   18.9400  145.2700      19.1       112       190        90
VIS    2025250    183200   18.9800  151.0100       7.2        59       970        92
VIS    2025250    183200   18.9700  149.0800       9.2        40       979        90
VIS    2025250    183200   18.9600  149.0500       9.6        43       974        90
VIS    2025250    183200   18.9500  149.0500       9.7        43       970        93
VIS    2025250    183200   18.9600  148.8400      10.1        38       997        94
VIS    2025250    183200   18.9500  148.4800       9.0        52       983        90
VIS    2025250    183200   18.9500  148.2300      10.7        37       971       100
VIS    2025250    183200   18.9600  148.2000      10.3        39       956       100
VIS    2025250    183200   18.9500  148.1700       9.0        35       953        97
VIS    2025250    183200   18.9500  148.1500       8.5        37       855        92
VIS    2025250    183200   18.9400  148.1200       9.9        44       853        94
VIS    2025250    183200   18.9600  148.1000       9.7        42       855        94
VIS    2025250    183200   18.9500  148.0800       9.9        43       854        91
VIS    2025250    183200   18.9600  148.0400       9.8        51       851        91
VIS    2025250    183200   18.9500  148.0400      10.1        53       874        92
VIS    2025250    183200   18.9500  147.9900       9.6        47       928        94
VIS    2025250    183200   18.9400  147.9700       9.5        41       908        98
VIS    2025250    183200   18.9500  147.9500      10.1        42       877        97
VIS    2025250    183200   18.9600  147.9200      11.0        38       874        95
VIS    2025250    183200   18.9400  147.9000      11.3        42       874        94
VIS    2025250    183200   18.9400  147.8700      10.6        44       902        98
VIS    2025250    183200   18.9400  147.8600      10.4        45       902        98
VIS    2025250    183200   18.9600  147.8200      11.0        49       924        99
VIS    2025250    183200   18.9600  147.8100      11.1        47       933        99
VIS    2025250    183200   18.9500  147.7800      11.1        49       938        96
VIS    2025250    183200   18.9500  147.7500      10.6        53       909        94
VIS    2025250    183200   18.9400  147.7300      11.1        47       908        96
VIS    2025250    183200   18.9500  147.7200      11.5        44       908        97
VIS    2025250    183200   18.9400  147.6900      11.9        43       906        97
VIS    2025250    183200   18.9500  147.6600      11.8        42       901        96
VIS    2025250    183200   18.9400  147.6200      13.0        40       903        96
VIS    2025250    183200   18.9400  147.6000      13.3        39       896        94
VIS    2025250    183200   18.9400  147.5800      12.5        40       882        94
VIS    2025250    183200   18.9400  147.5500      10.9        44       839        92
VIS    2025250    183200   18.9400  147.5400      10.5        47       822        92
VIS    2025250    183200   18.9500  147.4500      11.2        52       721        90
VIS    2025250    183200   18.9500  147.4400      10.7        55       705        90
VIS    2025250    183200   18.9500  147.3700      10.7        58       702        90
VIS    2025250    183200   18.9300  147.2300       9.8        56       704        90
VIS    2025250    183200   18.9400  147.2100      10.0        53       702        90
VIS    2025250    183200   18.9300  147.2000      10.2        52       702        90
VIS    2025250    183200   18.9500  147.1100      12.2        52       733        92
VIS    2025250    183200   18.9300  147.0800      12.3        51       710        90
VIS    2025250    183200   18.9400  147.0100      13.3        48       786        91
VIS    2025250    183200   18.9400  146.9900      13.2        47       845        95
VIS    2025250    183200   18.9500  146.9700      13.9        44       852        94
VIS    2025250    183200   18.9400  146.9400      13.4        46       852        95
VIS    2025250    183200   18.9200  144.8900      15.0       146       170        92
VIS    2025250    183200   18.9600  150.9800       7.1        69       939        90
VIS    2025250    183200   18.9500  150.9600       6.8        66       970        92
VIS    2025250    183200   18.9500  149.0400       9.8        42       970        95
VIS    2025250    183200   18.9300  149.0300       9.9        41       970        96
VIS    2025250    183200   18.9400  148.8400      10.4        37       994        95
VIS    2025250    183200   18.9400  148.5200       8.6        55       977        91
VIS    2025250    183200   18.9400  148.4800       8.9        51       977        93
VIS    2025250    183200   18.9300  148.4800       8.7        50       961        96
VIS    2025250    183200   18.9200  148.2600       9.0        46       968        91
VIS    2025250    183200   18.9400  148.2300      10.4        38       968        99
VIS    2025250    183200   18.9400  148.2200      10.3        38       968       100
VIS    2025250    183200   18.9200  148.2000       9.2        44       966        95
VIS    2025250    183200   18.9200  148.1600       8.7        40       956        95
VIS    2025250    183200   18.9400  148.1400       9.0        34       855        92
VIS    2025250    183200   18.9200  148.1200       9.9        42       854        91
VIS    2025250    183200   18.9200  148.0800      10.0        44       851        93
VIS    2025250    183200   18.9400  148.0700      10.0        42       851        92
VIS    2025250    183200   18.9300  148.0300      11.0        48       874        96
VIS    2025250    183200   18.9200  148.0100      10.8        49       891        98
VIS    2025250    183200   18.9200  147.9800       9.8        43       929        97
VIS    2025250    183200   18.9400  147.9700       9.5        41       908        98
VIS    2025250    183200   18.9200  147.9500      10.0        44       896        98
VIS    2025250    183200   18.9300  147.9100      11.4        44       875        95
VIS    2025250    183200   18.9300  147.9000      11.4        44       880        95
VIS    2025250    183200   18.9400  147.8600      10.5        45       902        96
VIS    2025250    183200   18.9300  147.8500      10.5        48       903        95
VIS    2025250    183200   18.9200  147.8200      11.1        51       916        99
VIS    2025250    183200   18.9200  147.7900      11.1        44       940        99
VIS    2025250    183200   18.9100  147.7600      11.0        44       962        97
VIS    2025250    183200   18.9300  147.7400      10.8        48       922        96
VIS    2025250    183200   18.9300  147.7200      11.4        45       915        97
VIS    2025250    183200   18.9300  147.6900      11.8        43       906        97
VIS    2025250    183200   18.9300  147.6600      11.6        43       898        97
VIS    2025250    183200   18.9300  147.6400      11.9        42       901        96
VIS    2025250    183200   18.9200  147.6100      12.3        40       903        96
VIS    2025250    183200   18.9100  147.6000      11.9        40       903        94
VIS    2025250    183200   18.9200  147.5600      11.2        45       874        94
VIS    2025250    183200   18.9200  147.5400      10.2        51       842        94
VIS    2025250    183200   18.9200  147.4000       9.9        52       702        91
VIS    2025250    183200   18.9200  147.3400      10.2        70       702        90
VIS    2025250    183200   18.9300  147.2200       9.8        56       704        90
VIS    2025250    183200   18.9100  147.0900      11.8        51       710        92
VIS    2025250    183200   18.9100  147.0100      14.6        48       814        91
VIS    2025250    183200   18.9100  146.9800      14.4        49       830        94
VIS    2025250    183200   18.9100  146.9600      13.9        47       827        93
VIS    2025250    183200   18.9300  146.9400      13.4        46       849        95
VIS    2025250    183200   18.9000  145.3000      17.4       105       192        91
VIS    2025250    183200   18.9000  145.2900      17.1       105       192        92
VIS    2025250    183200   18.9100  145.2600      17.3       109       192        92
VIS    2025250    183200   18.9300  150.9300       6.4        60       992        98
VIS    2025250    183200   18.9200  149.0400       9.7        42       990        97
VIS    2025250    183200   18.9200  149.0200      10.2        42       983        95
VIS    2025250    183200   18.9200  148.8600       9.3        36       994        97
VIS    2025250    183200   18.9000  148.8400       9.3        40       986        96
VIS    2025250    183200   18.9200  148.8200       9.6        39       978        98
VIS    2025250    183200   18.9100  148.5000       8.8        54       977        93
VIS    2025250    183200   18.9100  148.4900       8.9        53       983        93
VIS    2025250    183200   18.9100  148.4700       8.8        53       961        94
VIS    2025250    183200   18.9200  148.2600       8.9        47       968        91
VIS    2025250    183200   18.9000  148.2400       9.2        46       964        94
VIS    2025250    183200   18.9000  148.2100       9.3        43       960        95
VIS    2025250    183200   18.9000  148.1800       9.6        44       968        94
VIS    2025250    183200   18.9000  148.1500       9.4        46       956        92
VIS    2025250    183200   18.8900  148.1400       9.3        48       953        91
VIS    2025250    183200   18.9100  148.1100       9.8        43       852        90
VIS    2025250    183200   18.8900  148.0800       9.1        41       850        94
VIS    2025250    183200   18.9000  148.0600       9.7        41       847        95
VIS    2025250    183200   18.9000  148.0200      11.0        45       872        97
VIS    2025250    183200   18.9000  148.0100      10.9        46       890        98
VIS    2025250    183200   18.9000  147.9800      10.3        42       940        96
VIS    2025250    183200   18.9100  147.9700      10.0        42       926        97
VIS    2025250    183200   18.9000  147.9400      10.8        41       874        94
VIS    2025250    183200   18.9100  147.9100      11.3        47       869        97
VIS    2025250    183200   18.9000  147.8800      11.6        45       879        93
VIS    2025250    183200   18.9000  147.8500      11.1        48       902        96
VIS    2025250    183200   18.9100  147.8500      11.0        49       906        97
VIS    2025250    183200   18.8900  147.8000      11.2        41       913        96
VIS    2025250    183200   18.8900  147.7900      11.1        41       914        96
VIS    2025250    183200   18.8900  147.7500      11.4        43       965        97
VIS    2025250    183200   18.9000  147.7300      11.3        44       922        96
VIS    2025250    183200   18.8900  147.7100      11.2        44       905        96
VIS    2025250    183200   18.9000  147.6900      11.6        43       904        96
VIS    2025250    183200   18.8900  147.6600      11.7        42       896        96
VIS    2025250    183200   18.9000  147.6400      12.0        39       893        95
VIS    2025250    183200   18.8900  147.6200      11.8        38       893        93
VIS    2025250    183200   18.9000  147.5900      11.5        41       903        93
VIS    2025250    183200   18.9000  147.5600      10.6        49       873        91
VIS    2025250    183200   18.8900  147.4500      10.2        56       735        91
VIS    2025250    183200   18.8900  147.4200      10.6        55       735        92
VIS    2025250    183200   18.8900  147.4000      10.1        61       730        96
VIS    2025250    183200   18.8900  147.3600       9.6        73       705        98
VIS    2025250    183200   18.8900  147.3500       9.9        75       705        95
VIS    2025250    183200   18.9000  147.0100      14.6        48       814        91
VIS    2025250    183200   18.9000  146.9800      14.4        48       825        93
VIS    2025250    183200   18.9000  146.9600      13.9        47       825        93
VIS    2025250    183200   18.8700  145.3800      19.7       110       194        90
VIS    2025250    183200   18.8700  144.5500      13.1       137       173        90
VIS    2025250    183200   18.9200  150.9600       6.8        56       975        91
VIS    2025250    183200   18.8900  148.8300       9.2        39       985        93
VIS    2025250    183200   18.8800  148.2600      10.2        39       979        97
VIS    2025250    183200   18.8900  148.2300       9.5        43       964        94
VIS    2025250    183200   18.8800  148.2300       9.5        43       964        94
VIS    2025250    183200   18.8900  148.2000       9.7        42       958        95
VIS    2025250    183200   18.8800  148.1600      10.2        45       960        96
VIS    2025250    183200   18.8800  148.0900       8.6        42       851        92
VIS    2025250    183200   18.8800  148.0700       8.9        42       850        94
VIS    2025250    183200   18.8800  148.0400      10.3        46       848        96
VIS    2025250    183200   18.8700  148.0200      10.4        47       877        98
VIS    2025250    183200   18.8900  148.0000      10.5        46       921        99
VIS    2025250    183200   18.8700  147.9600      11.3        37       903        96
VIS    2025250    183200   18.8800  147.9600      11.2        38       899        95
VIS    2025250    183200   18.8900  147.9100      11.3        43       842        90
VIS    2025250    183200   18.8700  147.8600      11.2        50       876        98
VIS    2025250    183200   18.8700  147.8400      11.1        49       895        99
VIS    2025250    183200   18.8700  147.8300      11.1        49       906       100
VIS    2025250    183200   18.8900  147.7900      11.1        40       916        96
VIS    2025250    183200   18.8800  147.7800      11.0        40       913        96
VIS    2025250    183200   18.8600  147.7400      11.3        45       904        96
VIS    2025250    183200   18.8600  147.7300      11.2        46       904        96
VIS    2025250    183200   18.8800  147.7100      11.1        44       904        96
VIS    2025250    183200   18.8700  147.6800      11.4        42       900        95
VIS    2025250    183200   18.8800  147.6600      11.8        41       896        96
VIS    2025250    183200   18.8800  147.6200      11.8        38       893        93
VIS    2025250    183200   18.8800  147.6000      11.3        39       890        91
VIS    2025250    183200   18.8600  147.4400      12.0        53       740        91
VIS    2025250    183200   18.8600  147.4400      11.9        53       746        92
VIS    2025250    183200   18.8800  147.3900      10.0        64       730        97
VIS    2025250    183200   18.8800  147.3700       9.3        65       708        96
VIS    2025250    183200   18.8700  147.3500       9.3        63       705        90
VIS    2025250    183200   18.8600  147.3300      10.8        58       701        90
VIS    2025250    183200   18.8600  147.2400      10.4        54       708        91
VIS    2025250    183200   18.8500  145.4900      15.9        90       198        99
VIS    2025250    183200   18.8600  145.3900      19.6       112       194        90
VIS    2025250    183200   18.8600  145.3200      19.0       101       191        91
VIS    2025250    183200   18.8400  144.9600      12.8       130       160        90
VIS    2025250    183200   18.8700  148.4600       9.2        57       940        92
VIS    2025250    183200   18.8500  148.3300      11.8        39       999        90
VIS    2025250    183200   18.8500  148.2900      11.5        39       987        92
VIS    2025250    183200   18.8600  148.2800      11.6        38       977        93
VIS    2025250    183200   18.8600  148.2400      10.2        39       977        96
VIS    2025250    183200   18.8500  148.2300       9.8        40       977        95
VIS    2025250    183200   18.8500  148.2100       9.3        44       953        95
VIS    2025250    183200   18.8400  148.1700       9.3        48       949        96
VIS    2025250    183200   18.8600  148.1500      10.0        46       958        95
VIS    2025250    183200   18.8600  148.1300       9.6        49       947        94
VIS    2025250    183200   18.8500  148.1000       9.5        44       900        97
VIS    2025250    183200   18.8600  148.0800       9.0        40       880        95
VIS    2025250    183200   18.8500  148.0600       9.5        43       872        93
VIS    2025250    183200   18.8400  148.0200      10.7        47       849        96
VIS    2025250    183200   18.8600  148.0100      10.5        46       884        99
VIS    2025250    183200   18.8600  147.9700      11.7        36       903        96
VIS    2025250    183200   18.8600  147.9600      11.7        36       899        95
VIS    2025250    183200   18.8500  147.8900      11.1        48       860        90
VIS    2025250    183200   18.8500  147.8800      10.7        50       861        96
VIS    2025250    183200   18.8500  147.8400      11.2        47       895        99
VIS    2025250    183200   18.8400  147.8400      11.1        46       918        99
VIS    2025250    183200   18.8400  147.7900      10.9        41       908        98
VIS    2025250    183200   18.8400  147.7800      11.4        40       908        97
VIS    2025250    183200   18.8500  147.7500      11.4        41       893        96
VIS    2025250    183200   18.8400  147.7200      10.8        45       891        95
VIS    2025250    183200   18.8500  147.6900      11.4        43       897        95
VIS    2025250    183200   18.8500  147.6800      11.9        40       897        95
VIS    2025250    183200   18.8500  147.6500      12.0        41       893        96
VIS    2025250    183200   18.8500  147.6200      11.4        42       887        95
VIS    2025250    183200   18.8600  147.5900      10.9        43       885        92
VIS    2025250    183200   18.8400  147.5700       9.6        57       844        91
VIS    2025250    183200   18.8500  147.4100      11.2        58       746        91
VIS    2025250    183200   18.8600  147.3800       9.5        59       725        91
VIS    2025250    183200   18.8600  147.3600       9.1        60       708        91
VIS    2025250    183200   18.8300  147.2500      10.9        52       702        92
VIS    2025250    183200   18.8500  147.2200      10.3        56       714        92
VIS    2025250    183200   18.8300  147.1700      10.9        51       701        91
VIS    2025250    183200   18.8400  147.0400      12.0        53       716        91
VIS    2025250    183200   18.8400  146.9700      12.5        58       737        90
VIS    2025250    183200   18.8300  146.9400      13.0        65       727        94
VIS    2025250    183200   18.8200  145.4900      16.5        98       198        99
VIS    2025250    183200   18.8400  145.4800      15.8        97       198        99
VIS    2025250    183200   18.8300  145.4000      19.5       106       194        91
VIS    2025250    183200   18.8400  145.3600      20.0       101       194        90
VIS    2025250    183200   18.8300  144.9600      13.2       131       160        92
VIS    2025250    183200   18.8300  144.9400      12.2       133       160        96
VIS    2025250    183200   18.8500  150.8400       6.6        52       990        96
VIS    2025250    183200   18.8600  150.8300       6.8        48       984        91
VIS    2025250    183200   18.8500  150.7900       6.7        46       983        96
VIS    2025250    183200   18.8500  150.7800       6.6        50       982        97
VIS    2025250    183200   18.8600  150.7600       6.7        57       982        98
VIS    2025250    183200   18.8400  148.8200       9.4        38       987        94
VIS    2025250    183200   18.8300  148.8000       9.3        39       987        95
VIS    2025250    183200   18.8300  148.7800       9.1        39       987        96
VIS    2025250    183200   18.8400  148.5200       9.5        48       996        91
VIS    2025250    183200   18.8300  148.4900      10.1        54       961        92
VIS    2025250    183200   18.8300  148.4700       9.8        49       918        95
VIS    2025250    183200   18.8300  148.4500       9.4        47       918        95
VIS    2025250    183200   18.8400  148.3300      11.7        40       999        91
VIS    2025250    183200   18.8200  148.3100      11.5        41       987        94
VIS    2025250    183200   18.8200  148.3000      11.4        41       987        92
VIS    2025250    183200   18.8400  148.2800      11.3        39       977        92
VIS    2025250    183200   18.8400  148.2600      10.6        39       977        93
VIS    2025250    183200   18.8400  148.2200       9.5        43       977        94
VIS    2025250    183200   18.8200  148.1900       9.0        48       958        96
VIS    2025250    183200   18.8200  148.1700       9.0        52       959        93
VIS    2025250    183200   18.8200  148.1400       9.7        49       959        94
VIS    2025250    183200   18.8400  148.1200       9.7        49       947        95
VIS    2025250    183200   18.8400  148.0900       9.6        44       903        97
VIS    2025250    183200   18.8200  148.0800      10.0        43       903        97
VIS    2025250    183200   18.8200  148.0600       9.6        46       880        97
VIS    2025250    183200   18.8300  148.0100      11.0        46       849        94
VIS    2025250    183200   18.8200  147.9900      11.6        42       875        94
VIS    2025250    183200   18.8200  147.9800      11.7        39       887        93
VIS    2025250    183200   18.8200  147.8900      11.6        50       861        96
VIS    2025250    183200   18.8200  147.8700      11.3        50       861        97
VIS    2025250    183200   18.8400  147.8500      11.3        48       887        98
VIS    2025250    183200   18.8400  147.8300      11.1        45       918        99
VIS    2025250    183200   18.8300  147.8100      11.0        43       919        99
VIS    2025250    183200   18.8400  147.7900      11.1        40       908        98
VIS    2025250    183200   18.8200  147.7400      12.2        43       878        94
VIS    2025250    183200   18.8300  147.7300      12.0        43       877        95
VIS    2025250    183200   18.8100  147.6900      12.6        40       872        94
VIS    2025250    183200   18.8200  147.6700      12.5        41       873        92
VIS    2025250    183200   18.8300  147.6400      11.8        42       887        95
VIS    2025250    183200   18.8300  147.6400      11.6        41       887        95
VIS    2025250    183200   18.8300  147.6100      11.2        44       878        95
VIS    2025250    183200   18.8200  147.5700       9.7        57       817        95
VIS    2025250    183200   18.8200  147.5600       9.5        60       818        95
VIS    2025250    183200   18.8100  147.5300       9.9        63       803        94
VIS    2025250    183200   18.8100  147.5100      10.3        62       783        91
VIS    2025250    183200   18.8300  147.2500      11.0        51       702        92
VIS    2025250    183200   18.8100  147.2300      11.2        50       724        92
VIS    2025250    183200   18.8200  147.1700      10.9        51       701        91
VIS    2025250    183200   18.8300  146.9700      11.7        57       737        91
VIS    2025250    183200   18.8300  146.9500      12.5        63       705        95
VIS    2025250    183200   18.7900  145.4800      16.5       100       197        97
VIS    2025250    183200   18.8000  145.4700      17.2        98       197        96
VIS    2025250    183200   18.8100  145.3900      18.7       106       193        93
VIS    2025250    183200   18.7900  145.3600      19.1       114       190        91
VIS    2025250    183200   18.8000  144.9600      14.2       134       159        94
VIS    2025250    183200   18.8500  150.8400       6.7        52       990        95
VIS    2025250    183200   18.8300  150.8100       6.7        51       952        91
VIS    2025250    183200   18.8300  150.7900       6.8        51       950        92
VIS    2025250    183200   18.8400  150.7700       6.5        55       963        92
VIS    2025250    183200   18.8200  148.8100       9.4        41       987        94
VIS    2025250    183200   18.8100  148.8100       9.5        41       987        95
VIS    2025250    183200   18.8000  148.7600       8.4        33       978        97
VIS    2025250    183200   18.8000  148.7500       8.3        24       978        95
VIS    2025250    183200   18.8000  148.7300       8.5        20       987        91
VIS    2025250    183200   18.8100  148.5200       9.8        49       983        90
VIS    2025250    183200   18.8000  148.5000      10.0        50       957        91
VIS    2025250    183200   18.8000  148.4700       9.9        49       916        93
VIS    2025250    183200   18.8000  148.3100      11.6        40       980        94
VIS    2025250    183200   18.8100  148.3000      11.3        41       980        93
VIS    2025250    183200   18.8000  148.2600       9.8        44       930        92
VIS    2025250    183200   18.8000  148.2500       9.7        45       930        93
VIS    2025250    183200   18.8000  148.2200      10.4        39       975        96
VIS    2025250    183200   18.8100  148.1800       9.4        45       960        97
VIS    2025250    183200   18.8100  148.1600       9.3        50       959        95
VIS    2025250    183200   18.8100  148.1500       9.5        48       959        96
VIS    2025250    183200   18.8000  148.1200      10.3        44       968        95
VIS    2025250    183200   18.8100  148.1000      10.6        41       953        97
VIS    2025250    183200   18.8000  148.0600      10.2        41       903        96
VIS    2025250    183200   18.8000  148.0500      10.0        42       880        96
VIS    2025250    183200   18.8100  148.0300      10.7        46       874        95
VIS    2025250    183200   18.8000  147.9900      11.5        42       875        93
VIS    2025250    183200   18.8000  147.9600      11.6        36       887        92
VIS    2025250    183200   18.8000  147.9600      11.6        36       887        91
VIS    2025250    183200   18.8100  147.8900      11.6        50       861        96
VIS    2025250    183200   18.8000  147.8700      11.4        50       863        97
VIS    2025250    183200   18.8100  147.8600      11.4        49       879        97
VIS    2025250    183200   18.8100  147.8300      11.2        46       918        96
VIS    2025250    183200   18.8000  147.8000      10.9        44       916        97
VIS    2025250    183200   18.7900  147.7600      11.2        47       892        92
VIS    2025250    183200   18.8000  147.7600      11.6        45       892        93
VIS    2025250    183200   18.7900  147.7100      12.6        40       870        94
VIS    2025250    183200   18.8000  147.7100      12.7        39       870        93
VIS    2025250    183200   18.7900  147.6600      12.4        39       868        93
VIS    2025250    183200   18.7900  147.6600      12.3        40       873        93
VIS    2025250    183200   18.8000  147.6300      11.6        40       878        94
VIS    2025250    183200   18.8100  147.5900      11.3        46       844        94
VIS    2025250    183200   18.8000  147.5800      10.8        49       817        91
VIS    2025250    183200   18.8100  147.5600       9.8        55       817        93
VIS    2025250    183200   18.8100  147.5200       9.6        63       790        93
VIS    2025250    183200   18.7900  147.5000       9.4        61       716        90
VIS    2025250    183200   18.7900  147.3800       9.9        59       701        90
VIS    2025250    183200   18.8000  147.2300      11.4        50       713        92
VIS    2025250    183200   18.7900  147.2100      11.1        52       745        92
VIS    2025250    183200   18.7900  145.4700      17.2        98       197        95
VIS    2025250    183200   18.7700  145.4100      19.7        96       192        91
VIS    2025250    183200   18.7800  145.4000      19.8        99       191        91
VIS    2025250    183200   18.7900  145.3700      19.2       111       191        91
VIS    2025250    183200   18.7800  145.3500      19.0       114       190        90
VIS    2025250    183200   18.7800  144.9800      15.9       135       159        91
VIS    2025250    183200   18.8100  150.2100       8.0        49       996        90
VIS    2025250    183200   18.7800  148.8100       9.3        43       997        94
VIS    2025250    183200   18.8000  148.7700       8.8        40       981        98
VIS    2025250    183200   18.7800  148.7100       9.2        30       987        90
VIS    2025250    183200   18.7900  148.5300      10.1        42       983        96
VIS    2025250    183200   18.7800  148.5000      10.3        45       956        94
VIS    2025250    183200   18.7900  148.4800      10.0        49       921        95
VIS    2025250    183200   18.7700  148.3500      10.3        38       996        93
VIS    2025250    183200   18.7700  148.3300      10.0        41       974        97
VIS    2025250    183200   18.7800  148.3100      11.0        40       974        97
VIS    2025250    183200   18.7900  148.2800      10.5        42       925        93
VIS    2025250    183200   18.7900  148.2500       9.8        45       930        95
VIS    2025250    183200   18.7900  148.2500       9.9        44       935        95
VIS    2025250    183200   18.7900  148.2100      10.3        38       975        97
VIS    2025250    183200   18.7700  148.1800       9.7        45       963        93
VIS    2025250    183200   18.7700  148.1600       9.3        45       963        94
VIS    2025250    183200   18.7800  148.1300       9.7        43       971        94
VIS    2025250    183200   18.7800  148.1200       9.4        41       971        95
VIS    2025250    183200   18.7800  148.0900       9.9        44       936        98
VIS    2025250    183200   18.7900  148.0600       9.7        41       899        97
VIS    2025250    183200   18.7700  148.0500       9.3        38       880        95
VIS    2025250    183200   18.7700  148.0200      10.0        42       847        95
VIS    2025250    183200   18.7900  147.9800      11.1        42       874        94
VIS    2025250    183200   18.7700  147.9600      11.4        37       885        94
VIS    2025250    183200   18.7900  147.9400      11.5        38       902        90
VIS    2025250    183200   18.7700  147.9200      12.2        42       898        95
VIS    2025250    183200   18.7900  147.8800      11.6        48       870        96
VIS    2025250    183200   18.7700  147.8500      11.0        47       874        97
VIS    2025250    183200   18.7900  147.8400      11.1        48       914        97
VIS    2025250    183200   18.7700  147.8100      10.7        48       918        99
VIS    2025250    183200   18.7700  147.7900      11.0        46       918        97
VIS    2025250    183200   18.7700  147.7800      11.3        47       898        94
VIS    2025250    183200   18.7800  147.7500      11.3        46       879        90
VIS    2025250    183200   18.7900  147.7200      12.4        41       870        94
VIS    2025250    183200   18.7700  147.7000      12.3        39       864        92
VIS    2025250    183200   18.7800  147.6600      12.2        40       873        94
VIS    2025250    183200   18.7700  147.6300      11.6        40       874        93
VIS    2025250    183200   18.7800  147.6300      11.6        39       874        93
VIS    2025250    183200   18.7800  147.5000       9.4        58       716        90
VIS    2025250    183200   18.7700  147.3900      10.7        53       725        90
VIS    2025250    183200   18.7700  147.3600       9.9        67       721        97
VIS    2025250    183200   18.7800  147.2400      10.9        52       713        92
VIS    2025250    183200   18.7700  147.2200      11.0        52       740        90
VIS    2025250    183200   18.7800  147.2100      11.0        52       745        92
VIS    2025250    183200   18.7600  147.0900      11.1        50       731        91
VIS    2025250    183200   18.7800  150.2000       7.6        47       996        94
VIS    2025250    183200   18.7700  148.8000       9.0        44       987        95
VIS    2025250    183200   18.7700  148.7800       9.0        41       979        96
VIS    2025250    183200   18.7700  148.7100       9.2        32       987        90
VIS    2025250    183200   18.7600  148.5400      10.4        40       983        97
VIS    2025250    183200   18.7500  148.4900      10.4        46       956        93
VIS    2025250    183200   18.7500  148.4800       9.9        47       942        90
VIS    2025250    183200   18.7500  148.3900       8.5        43       984        96
VIS    2025250    183200   18.7500  148.3500      10.0        39       989        95
VIS    2025250    183200   18.7500  148.3400       9.7        40       972        95
VIS    2025250    183200   18.7500  148.3000       9.9        39       925        96
VIS    2025250    183200   18.7600  148.2800      10.0        40       925        96
VIS    2025250    183200   18.7600  148.2500      11.2        42       929        96
VIS    2025250    183200   18.7700  148.2000       9.8        44       969        90
VIS    2025250    183200   18.7600  148.1800       9.4        50       963        90
VIS    2025250    183200   18.7700  148.1600       9.2        45       963        93
VIS    2025250    183200   18.7700  148.1200       8.6        37       971        92
VIS    2025250    183200   18.7600  148.1000       8.9        39       951        97
VIS    2025250    183200   18.7400  148.0800       9.7        39       937        98
VIS    2025250    183200   18.7500  148.0600       9.2        36       899        97
VIS    2025250    183200   18.7400  148.0300       9.1        42       851        98
VIS    2025250    183200   18.7400  148.0000      11.5        37       841        91
VIS    2025250    183200   18.7600  147.9600      12.2        35       889        90
VIS    2025250    183200   18.7400  147.9200      11.7        43       889        96
VIS    2025250    183200   18.7600  147.9100      12.0        43       888        96
VIS    2025250    183200   18.7400  147.8900      10.9        43       880        96
VIS    2025250    183200   18.7500  147.8500      11.1        46       874        97
VIS    2025250    183200   18.7500  147.8400      11.3        46       883        98
VIS    2025250    183200   18.7600  147.8000      10.9        47       918        99
VIS    2025250    183200   18.7600  147.7900      11.1        46       918        97
VIS    2025250    183200   18.7400  147.7600      11.6        46       892        98
VIS    2025250    183200   18.7500  147.7400      11.1        45       866        96
VIS    2025250    183200   18.7600  147.7000      11.9        41       864        92
VIS    2025250    183200   18.7500  147.6800      12.2        39       868        93
VIS    2025250    183200   18.7400  147.6500      11.9        38       877        93
VIS    2025250    183200   18.7400  147.6300      11.4        40       881        97
VIS    2025250    183200   18.7500  147.6200      11.4        42       874        91
VIS    2025250    183200   18.7400  147.5600       9.8        62       776        90
VIS    2025250    183200   18.7400  147.5300      10.1        67       787        91
VIS    2025250    183200   18.7400  147.5000       9.9        70       763        92
VIS    2025250    183200   18.7400  147.5000       9.8        68       748        92
VIS    2025250    183200   18.7400  147.4200      11.7        36       827        93
VIS    2025250    183200   18.7400  147.1300      11.4        47       718        93
VIS    2025250    183200   18.7400  147.1000      11.2        49       724        90
VIS    2025250    183200   18.7200  145.4800      16.0        95       193        90
VIS    2025250    183200   18.7200  144.4900      18.2       154       166        95
VIS    2025250    183200   18.7200  144.4700      18.2       154       166        95
VIS    2025250    183200   18.7300  144.4600      18.2       154       166        95
VIS    2025250    183200   18.7400  148.7300       9.5        35       980        92
VIS    2025250    183200   18.7300  148.5500       9.4        47       989        93
VIS    2025250    183200   18.7300  148.5100      10.4        44       975        90
VIS    2025250    183200   18.7200  148.4400       9.0        48       897        97
VIS    2025250    183200   18.7200  148.3600       9.1        41       956        96
VIS    2025250    183200   18.7400  148.3400       9.7        38       956        94
VIS    2025250    183200   18.7400  148.2900      10.4        37       921        93
VIS    2025250    183200   18.7300  148.1700       9.0        54       932        90
VIS    2025250    183200   18.7300  148.1600       8.7        52       935        90
VIS    2025250    183200   18.7300  148.1300       8.8        42       947        94
VIS    2025250    183200   18.7200  148.1000      10.4        34       957        99
VIS    2025250    183200   18.7400  148.0700       9.8        38       936        98
VIS    2025250    183200   18.7200  148.0400       9.6        39       903        97
VIS    2025250    183200   18.7200  148.0300       9.1        44       856        95
VIS    2025250    183200   18.7400  147.9700      13.2        30       886        91
VIS    2025250    183200   18.7400  147.9700      13.1        31       889        91
VIS    2025250    183200   18.7200  147.9200      11.5        41       882        96
VIS    2025250    183200   18.7400  147.9000      11.2        42       881        98
VIS    2025250    183200   18.7200  147.8800      10.9        42       867        97
VIS    2025250    183200   18.7200  147.8600      11.3        43       871        96
VIS    2025250    183200   18.7200  147.8400      11.8        44       882        98
VIS    2025250    183200   18.7400  147.8100      11.6        45       931        96
VIS    2025250    183200   18.7300  147.7900      11.7        45       931        96
VIS    2025250    183200   18.7300  147.7500      11.5        46       885        98
VIS    2025250    183200   18.7300  147.7300      11.1        45       866        98
VIS    2025250    183200   18.7200  147.7000      11.0        43       857        97
VIS    2025250    183200   18.7400  147.6900      11.8        42       860        97
VIS    2025250    183200   18.7400  147.6600      11.8        38       876        97
VIS    2025250    183200   18.7300  147.6400      11.5        38       885        97
VIS    2025250    183200   18.7100  147.6000      10.3        49       850        95
VIS    2025250    183200   18.7300  147.5900      10.3        52       776        91
VIS    2025250    183200   18.7200  147.5500       9.7        64       776        90
VIS    2025250    183200   18.7300  147.5000       9.9        69       748        90
VIS    2025250    183200   18.7100  147.4500      10.2        53       774        95
VIS    2025250    183200   18.7300  147.4300      11.4        38       827        90
VIS    2025250    183200   18.7300  147.4200      11.4        37       827        94
VIS    2025250    183200   18.7200  147.3300      11.2        43       734        91
VIS    2025250    183200   18.7200  147.2500      11.1        47       709        97
VIS    2025250    183200   18.7200  147.2200      11.6        45       750        96
VIS    2025250    183200   18.7300  147.1800      10.7        50       728        95
VIS    2025250    183200   18.7200  147.1600      10.5        51       715        97
VIS    2025250    183200   18.7100  147.1400      10.5        50       708        96
VIS    2025250    183200   18.7300  147.1300      11.5        47       708        95
VIS    2025250    183200   18.7300  147.1000      12.1        46       718        94
VIS    2025250    183200   18.7100  147.0800      12.6        48       708        92
VIS    2025250    183200   18.7200  145.5500      16.9        79       192        91
VIS    2025250    183200   18.7000  144.9300      14.0       129       155        91
VIS    2025250    183200   18.7000  144.9100      14.7       130       155        90
VIS    2025250    183200   18.6900  144.7000      16.4       143       158        90
VIS    2025250    183200   18.6900  144.6500      14.3       147       161        94
VIS    2025250    183200   18.7000  148.6500       8.7        33       993        90
VIS    2025250    183200   18.7000  148.5500       8.5        45       990        92
VIS    2025250    183200   18.7200  148.4600       9.6        47       918        90
VIS    2025250    183200   18.7200  148.4400       9.1        47       897        97
VIS    2025250    183200   18.7100  148.4300       9.2        45       916        96
VIS    2025250    183200   18.7100  148.3600       9.1        43       980        91
VIS    2025250    183200   18.7000  148.3500       9.4        40       954        96
VIS    2025250    183200   18.7000  148.3300       9.7        38       939        97
VIS    2025250    183200   18.7200  148.3100      10.3        38       921        96
VIS    2025250    183200   18.7000  148.2300      11.3        49       889        94
VIS    2025250    183200   18.7100  148.0900      10.7        37       957        91
VIS    2025250    183200   18.7100  148.0900      11.1        35       960        98
VIS    2025250    183200   18.7100  148.0500      10.3        36       930        98
VIS    2025250    183200   18.7000  148.0200       8.5        45       901        97
VIS    2025250    183200   18.7100  147.9900      10.1        42       840        97
VIS    2025250    183200   18.7100  147.9700      12.9        31       871        92
VIS    2025250    183200   18.7100  147.9600      12.5        33       871        94
VIS    2025250    183200   18.6900  147.9200      11.6        39       867        95
VIS    2025250    183200   18.6900  147.9100      11.6        39       859        94
VIS    2025250    183200   18.7100  147.8700      11.3        42       859        95
VIS    2025250    183200   18.7000  147.8400      11.2        44       874        98
VIS    2025250    183200   18.7000  147.8400      11.1        44       874        98
VIS    2025250    183200   18.7000  147.8100      11.2        43       930        97
VIS    2025250    183200   18.6900  147.7700      11.4        45       900        97
VIS    2025250    183200   18.7100  147.7500      11.5        45       885        97
VIS    2025250    183200   18.7000  147.7200      11.0        43       863        97
VIS    2025250    183200   18.7000  147.7200      10.8        43       863        97
VIS    2025250    183200   18.7000  147.6800      11.1        40       867        97
VIS    2025250    183200   18.7000  147.6500      10.9        38       882        97
VIS    2025250    183200   18.6900  147.6200      11.3        39       885        97
VIS    2025250    183200   18.6900  147.6200      11.3        40       885        97
VIS    2025250    183200   18.7000  147.5900      10.2        49       758        93
VIS    2025250    183200   18.7000  147.5700       9.3        59       757        92
VIS    2025250    183200   18.7000  147.5300      10.1        67       790        95
VIS    2025250    183200   18.6900  147.4500      10.2        54       756        95
VIS    2025250    183200   18.7100  147.4500      10.2        51       784        95
VIS    2025250    183200   18.6900  147.4200      11.6        39       798        94
VIS    2025250    183200   18.6900  147.3900      11.6        40       797        92
VIS    2025250    183200   18.6900  147.3700      11.6        39       752        90
VIS    2025250    183200   18.7100  147.3500      11.7        40       739        90
VIS    2025250    183200   18.6900  147.3200      10.6        44       737        92
VIS    2025250    183200   18.7000  147.2600      11.0        47       707        90
VIS    2025250    183200   18.7100  147.2400      11.3        46       712        90
VIS    2025250    183200   18.6900  147.2000      11.6        43       778        94
VIS    2025250    183200   18.6900  147.1900      11.9        44       780        94
VIS    2025250    183200   18.6900  147.1700      12.0        45       781        96
VIS    2025250    183200   18.7000  147.1400      10.7        47       721        93
VIS    2025250    183200   18.7000  147.1200      11.3        44       701        91
VIS    2025250    183200   18.6700  145.5200      17.1        89       192        91
VIS    2025250    183200   18.6800  145.2400      16.6       119       164        99
VIS    2025250    183200   18.6800  144.9200      13.9       133       155        95
VIS    2025250    183200   18.6800  144.8900      14.0       133       155        95
VIS    2025250    183200   18.6600  144.8600      13.7       137       154        92
VIS    2025250    183200   18.6700  144.8300      14.3       139       154        90
VIS    2025250    183200   18.6700  144.1700      15.4       177       174        94
VIS    2025250    183200   18.6900  148.7600      10.0        30       999        91
VIS    2025250    183200   18.6900  148.7600      10.2        29       999        92
VIS    2025250    183200   18.6900  148.6800       8.0        36       980        91
VIS    2025250    183200   18.6800  148.6400       9.9        39       980        92
VIS    2025250    183200   18.6800  148.6200      10.0        43       976        93
VIS    2025250    183200   18.7000  148.6100       9.5        42       989        95
VIS    2025250    183200   18.6900  148.5600       8.6        46       990        92
VIS    2025250    183200   18.6800  148.4300       9.6        41       927        94
VIS    2025250    183200   18.6700  148.4100       9.7        37       947        96
VIS    2025250    183200   18.6700  148.3700      10.6        32       981        97
VIS    2025250    183200   18.6900  148.3400       9.7        37       944        96
VIS    2025250    183200   18.6900  148.3300       9.7        37       939        96
VIS    2025250    183200   18.6800  148.3100       9.8        38       938        93
VIS    2025250    183200   18.6900  148.2800      12.2        39       900        90
VIS    2025250    183200   18.6700  148.2600      12.2        42       900        91
VIS    2025250    183200   18.6800  148.2200      10.8        46       924        93
VIS    2025250    183200   18.6800  148.1700       8.6        37       957        90
VIS    2025250    183200   18.6800  148.1500       9.1        36       944        90
VIS    2025250    183200   18.6900  148.1300       9.7        41       947        94
VIS    2025250    183200   18.6700  148.1100       9.9        39       974        95
VIS    2025250    183200   18.6800  148.0700      10.5        40       968        94
VIS    2025250    183200   18.6800  148.0500      10.4        34       963        97
VIS    2025250    183200   18.6900  148.0400      10.3        32       930        98
VIS    2025250    183200   18.6700  148.0100      10.3        32       901        96
VIS    2025250    183200   18.6900  147.9800      10.0        40       849        98
VIS    2025250    183200   18.6900  147.9600      11.3        37       849        95
VIS    2025250    183200   18.6800  147.9400      11.4        39       871        96
VIS    2025250    183200   18.6800  147.9100      11.5        39       839        93
VIS    2025250    183200   18.6700  147.8700      10.9        39       838        92
VIS    2025250    183200   18.6700  147.8500      10.6        42       858        96
VIS    2025250    183200   18.6900  147.8200      10.9        43       900        99
VIS    2025250    183200   18.6800  147.8100      11.1        43       924        98
VIS    2025250    183200   18.6800  147.7900      11.3        44       916        98
VIS    2025250    183200   18.6800  147.7500      11.6        45       882        93
VIS    2025250    183200   18.6700  147.7300      11.3        43       882        93
VIS    2025250    183200   18.6900  147.7000      10.7        41       863        96
VIS    2025250    183200   18.6700  147.6700      10.4        39       882        95
VIS    2025250    183200   18.6800  147.6500      10.6        37       885        95
VIS    2025250    183200   18.6700  147.6300      10.7        34       888        94
VIS    2025250    183200   18.6900  147.6200      11.3        39       888        97
VIS    2025250    183200   18.6700  147.5900      11.1        44       860        95
VIS    2025250    183200   18.6600  147.5600      10.5        53       761        96
VIS    2025250    183200   18.6800  147.5300      10.4        64       807        97
VIS    2025250    183200   18.6800  147.5000       9.9        65       807        93
VIS    2025250    183200   18.6700  147.5000       9.6        62       807        92
VIS    2025250    183200   18.6800  147.4600       9.9        54       756        96
VIS    2025250    183200   18.6700  147.4300      11.5        41       797        93
VIS    2025250    183200   18.6700  147.4100      11.9        40       798        93
VIS    2025250    183200   18.6800  147.3800      11.5        42       790        92
VIS    2025250    183200   18.6800  147.3500      10.8        44       763        93
VIS    2025250    183200   18.6700  147.3400      10.3        46       763        94
VIS    2025250    183200   18.6700  147.3100      10.1        49       709        92
VIS    2025250    183200   18.6600  147.2300      10.6        46       730        97
VIS    2025250    183200   18.6600  147.2200      10.7        45       744        96
VIS    2025250    183200   18.6800  147.1900      12.0        44       780        93
VIS    2025250    183200   18.6800  147.1700      12.1        44       781        95
VIS    2025250    183200   18.6600  147.1400      11.8        43       746        93
VIS    2025250    183200   18.6800  147.1300      10.8        45       731        94
VIS    2025250    183200   18.6500  145.6000      16.9        78       192        91
VIS    2025250    183200   18.6500  145.5300      16.2        81       189        93
VIS    2025250    183200   18.6500  144.8600      13.4       139       154        92
VIS    2025250    183200   18.6500  144.8400      13.7       139       154        92
VIS    2025250    183200   18.6500  144.8200      14.2       140       154        90
VIS    2025250    183200   18.6500  144.7300      14.6       141       154        94
VIS    2025250    183200   18.6800  150.7100       6.3        48       954       100
VIS    2025250    183200   18.6800  150.6900       5.3        49       947        95
VIS    2025250    183200   18.6700  148.7700       9.4        27       999        94
VIS    2025250    183200   18.6700  148.7300       9.8        31       999        93
VIS    2025250    183200   18.6500  148.7000       8.8        39       954        96
VIS    2025250    183200   18.6600  148.6700       9.0        40       954        96
VIS    2025250    183200   18.6600  148.6600       9.2        38       960        95
VIS    2025250    183200   18.6700  148.6200      10.0        43       976        93
VIS    2025250    183200   18.6700  148.6100       9.8        45       967        93
VIS    2025250    183200   18.6500  148.5400       9.5        41       986        93
VIS    2025250    183200   18.6500  148.5000      11.3        34       952        97
VIS    2025250    183200   18.6500  148.4900      11.4        35       952        97
VIS    2025250    183200   18.6600  148.4500      11.0        44       944        91
VIS    2025250    183200   18.6600  148.4200       9.8        43       947        90
VIS    2025250    183200   18.6700  148.4000       9.7        37       955        95
VIS    2025250    183200   18.6500  148.3800       9.7        36       958        96
VIS    2025250    183200   18.6500  148.3700      10.2        32       971        97
VIS    2025250    183200   18.6700  148.3300       9.9        34       944        92
VIS    2025250    183200   18.6700  148.3100       9.7        36       938        92
VIS    2025250    183200   18.6700  148.2900      10.5        38       916        96
VIS    2025250    183200   18.6600  148.2700      11.5        39       898        92
VIS    2025250    183200   18.6500  148.2300      11.4        41       930        98
VIS    2025250    183200   18.6500  148.2200      11.3        41       939        97
VIS    2025250    183200   18.6600  148.1900       9.7        38       959        96
VIS    2025250    183200   18.6600  148.1600       9.5        35       959        96
VIS    2025250    183200   18.6500  148.1300       9.8        39       957        95
VIS    2025250    183200   18.6600  148.1100       9.6        41       967        94
VIS    2025250    183200   18.6500  148.1000       9.5        44       981        93
VIS    2025250    183200   18.6700  148.0700      10.1        39       968        96
VIS    2025250    183200   18.6500  148.0300       9.6        33       903        98
VIS    2025250    183200   18.6500  148.0000      10.3        34       900        97
VIS    2025250    183200   18.6500  147.9900      10.8        36       900        98
VIS    2025250    183200   18.6500  147.9700      10.8        38       882        97
VIS    2025250    183200   18.6400  147.9400      10.8        39       874        95
VIS    2025250    183200   18.6600  147.9200      11.0        38       870        95
VIS    2025250    183200   18.6400  147.8800      10.2        37       836        93
VIS    2025250    183200   18.6400  147.8700      10.2        39       833        93
VIS    2025250    183200   18.6600  147.8500      10.4        43       865        98
VIS    2025250    183200   18.6600  147.8100      11.1        43       900        98
VIS    2025250    183200   18.6500  147.8000      11.2        43       886        98
VIS    2025250    183200   18.6500  147.7800      11.5        44       879        97
VIS    2025250    183200   18.6500  147.7300      11.1        44       882        94
VIS    2025250    183200   18.6500  147.7300      11.0        45       883        95
VIS    2025250    183200   18.6500  147.7000      10.8        42       889        96
VIS    2025250    183200   18.6600  147.6700      10.4        40       885        96
VIS    2025250    183200   18.6600  147.6500      10.6        37       889        95
VIS    2025250    183200   18.6600  147.6100      11.6        37       882        94
VIS    2025250    183200   18.6600  147.5900      11.4        43       860        95
VIS    2025250    183200   18.6500  147.5700      11.0        50       761        93
VIS    2025250    183200   18.6400  147.5400      11.3        46       782        93
VIS    2025250    183200   18.6400  147.5100      10.7        48       785        93
VIS    2025250    183200   18.6600  147.5000       9.6        59       785        91
VIS    2025250    183200   18.6400  147.4700       8.8        58       726        94
VIS    2025250    183200   18.6400  147.4400      10.1        44       780        93
VIS    2025250    183200   18.6500  147.4300      10.9        41       798        92
VIS    2025250    183200   18.6600  147.4000      11.6        44       804        95
VIS    2025250    183200   18.6500  147.3700      10.8        48       861        97
VIS    2025250    183200   18.6600  147.3400       9.8        49       763        94
VIS    2025250    183200   18.6400  147.3200       9.4        51       763        95
VIS    2025250    183200   18.6400  147.3000       9.8        50       716        93
VIS    2025250    183200   18.6400  147.2600      10.5        46       713        90
VIS    2025250    183200   18.6500  147.2600      10.4        47       711        91
VIS    2025250    183200   18.6400  147.2300      10.8        45       744        96
VIS    2025250    183200   18.6600  147.2100      11.0        43       747        93
VIS    2025250    183200   18.6600  147.1700      12.3        43       781        94
VIS    2025250    183200   18.6500  147.1500      12.1        43       744        94
VIS    2025250    183200   18.6600  147.1400      11.5        43       746        93
VIS    2025250    183200   18.6400  145.6100      17.0        77       192        91
VIS    2025250    183200   18.6400  145.5800      17.1        82       191        91
VIS    2025250    183200   18.6300  145.5300      15.5        73       188        90
VIS    2025250    183200   18.6400  145.5100      15.6        77       188        93
VIS    2025250    183200   18.6300  145.4600      15.0        82       186        95
VIS    2025250    183200   18.6200  144.7600      14.4       141       152        91
VIS    2025250    183200   18.6200  144.7400      13.7       141       152        94
VIS    2025250    183200   18.6200  144.5100      16.8       163       163        91
VIS    2025250    183200   18.6600  150.7900       7.6        52       991        96
VIS    2025250    183200   18.6500  150.7300       6.4        50       960        95
VIS    2025250    183200   18.6700  150.7100       5.9        49       947        99
VIS    2025250    183200   18.6400  148.7700       9.4        29       980        98
VIS    2025250    183200   18.6300  148.7500       9.6        30       980        98
VIS    2025250    183200   18.6400  148.7200       9.4        34       971        96
VIS    2025250    183200   18.6500  148.6900       8.7        39       947        94
VIS    2025250    183200   18.6300  148.6700       9.4        40       919        95
VIS    2025250    183200   18.6300  148.6500       9.9        39       924        96
VIS    2025250    183200   18.6300  148.6100      10.1        40       941        95
VIS    2025250    183200   18.6300  148.6000      10.0        43       941        93
VIS    2025250    183200   18.6400  148.5500       9.2        44       977        91
VIS    2025250    183200   18.6300  148.5100       9.8        34       950        93
VIS    2025250    183200   18.6300  148.4900      10.4        37       944        96
VIS    2025250    183200   18.6300  148.4800      10.4        40       912        96
VIS    2025250    183200   18.6300  148.4400      11.0        43       954        94
VIS    2025250    183200   18.6400  148.4100       9.5        41       958        92
VIS    2025250    183200   18.6400  148.4100       9.4        41       958        93
VIS    2025250    183200   18.6400  148.3800       9.9        34       958        96
VIS    2025250    183200   18.6400  148.3600      10.4        31       971        96
VIS    2025250    183200   18.6300  148.3300      10.4        33       963        94
VIS    2025250    183200   18.6300  148.2900      10.5        34       898        94
VIS    2025250    183200   18.6200  148.2700      10.8        36       892        93
VIS    2025250    183200   18.6200  148.2400      11.2        40       894        93
VIS    2025250    183200   18.6200  148.2100      11.1        40       945        97
VIS    2025250    183200   18.6300  148.2100      10.9        40       950        97
VIS    2025250    183200   18.6300  148.1800      10.3        35       962        98
VIS    2025250    183200   18.6400  148.1400       9.9        39       957        96
VIS    2025250    183200   18.6200  148.1200       9.1        47       927        92
VIS    2025250    183200   18.6400  148.1000       9.5        44       967        91
VIS    2025250    183200   18.6200  148.0700      11.2        38       970        97
VIS    2025250    183200   18.6200  148.0600      11.2        38       970        97
VIS    2025250    183200   18.6300  148.0300       9.4        36       924        98
VIS    2025250    183200   18.6200  148.0000       9.6        36       912        97
VIS    2025250    183200   18.6200  147.9700      10.4        41       900        96
VIS    2025250    183200   18.6200  147.9600      10.6        41       878        95
VIS    2025250    183200   18.6300  147.9300      10.3        38       871        94
VIS    2025250    183200   18.6400  147.8900       9.8        37       836        92
VIS    2025250    183200   18.6400  147.8800      10.1        39       835        92
VIS    2025250    183200   18.6300  147.8400      10.9        40       861        95
VIS    2025250    183200   18.6200  147.8400      11.1        41       861        95
VIS    2025250    183200   18.6200  147.8100      10.8        41       879        98
VIS    2025250    183200   18.6400  147.7900      11.2        42       886        99
VIS    2025250    183200   18.6300  147.7500      11.5        43       882        97
VIS    2025250    183200   18.6400  147.7200      11.1        45       883        96
VIS    2025250    183200   18.6300  147.7200      11.3        44       885        97
VIS    2025250    183200   18.6300  147.6900      11.1        43       892        96
VIS    2025250    183200   18.6200  147.6600      11.4        41       910        96
VIS    2025250    183200   18.6200  147.6300      11.3        40       903        97
VIS    2025250    183200   18.6400  147.6200      11.3        40       901        95
VIS    2025250    183200   18.6300  147.5900      11.4        45       861        93
VIS    2025250    183200   18.6200  147.5600      11.1        44       783        91
VIS    2025250    183200   18.6400  147.5400      11.5        44       782        92
VIS    2025250    183200   18.6300  147.5100      10.5        46       783        93
VIS    2025250    183200   18.6200  147.4800       9.6        53       731        90
VIS    2025250    183200   18.6100  147.4700       9.3        61       726        93
VIS    2025250    183200   18.6100  147.4200      11.0        44       818        95
VIS    2025250    183200   18.6200  147.4100      11.7        40       823        94
VIS    2025250    183200   18.6200  147.3900      11.9        39       852        97
VIS    2025250    183200   18.6200  147.3600      11.4        40       911        98
VIS    2025250    183200   18.6300  147.3300       9.6        50       797        95
VIS    2025250    183200   18.6300  147.3200       9.5        52       763        95
VIS    2025250    183200   18.6200  147.2900       9.9        49       716        93
VIS    2025250    183200   18.6300  147.2600      10.7        45       725        91
VIS    2025250    183200   18.6300  147.2400      11.0        44       744        91
VIS    2025250    183200   18.6200  147.2200      11.7        41       758        94
VIS    2025250    183200   18.6200  147.1900      13.0        39       760        92
VIS    2025250    183200   18.6200  147.1600      12.4        42       754        93
VIS    2025250    183200   18.6300  147.1500      12.0        44       744        94
VIS    2025250    183200   18.6200  147.1100      10.9        45       705        95
VIS    2025250    183200   18.6200  145.4600      15.2        83       186        93
VIS    2025250    183200   18.6000  144.7400      13.3       139       152        94
VIS    2025250    183200   18.5900  144.7200      12.0       135       152        92
VIS    2025250    183200   18.5900  144.6200      13.0       147       152        96
VIS    2025250    183200   18.5900  144.5300      16.9       159       158        93
VIS    2025250    183200   18.5900  144.3300      20.4       154       165        92
VIS    2025250    183200   18.6300  150.7600       6.8        56       985        92
VIS    2025250    183200   18.6200  148.7900       9.3        22       980        90
VIS    2025250    183200   18.6200  148.7700       9.3        27       979        99
VIS    2025250    183200   18.6000  148.7500       9.5        28       970        99
VIS    2025250    183200   18.6200  148.7100       9.3        37       947        97
VIS    2025250    183200   18.6000  148.6900       9.0        39       925        95
VIS    2025250    183200   18.6200  148.6700       9.7        39       919        97
VIS    2025250    183200   18.6100  148.6500      10.5        38       918        97
VIS    2025250    183200   18.6100  148.6200      10.6        37       921        97
VIS    2025250    183200   18.6200  148.5800      10.0        45       941        92
VIS    2025250    183200   18.6100  148.5600       9.4        46       941        94
VIS    2025250    183200   18.6000  148.5500       9.4        45       941        94
VIS    2025250    183200   18.6100  148.5200       9.3        39       941        92
VIS    2025250    183200   18.6100  148.4800       9.1        41       896        95
VIS    2025250    183200   18.6200  148.4700      10.3        42       910        96
VIS    2025250    183200   18.6000  148.4500      10.6        42       910        96
VIS    2025250    183200   18.6200  148.4200      10.2        39       958        95
VIS    2025250    183200   18.6100  148.4100       9.7        39       946        95
VIS    2025250    183200   18.6000  148.3800      10.1        37       910        92
VIS    2025250    183200   18.6200  148.3600      10.3        34       952        91
VIS    2025250    183200   18.6200  148.3300      10.4        34       952        94
VIS    2025250    183200   18.6000  148.3000      10.6        37       907        94
VIS    2025250    183200   18.6100  148.2800      11.0        36       895        92
VIS    2025250    183200   18.6200  148.2600      11.2        38       892        91
VIS    2025250    183200   18.6200  148.2100      11.2        40       950        96
VIS    2025250    183200   18.6200  148.1900      10.8        39       964        96
VIS    2025250    183200   18.6100  148.1800      10.7        38       964        97
VIS    2025250    183200   18.6200  148.1400       9.5        42       930        97
VIS    2025250    183200   18.6100  148.1100       9.4        47       918        94
VIS    2025250    183200   18.6000  148.1100      10.1        46       919        96
VIS    2025250    183200   18.6200  148.0600      11.4        38       957        97
VIS    2025250    183200   18.6000  148.0400      11.2        35       960        98
VIS    2025250    183200   18.6000  148.0300      11.2        35       960        98
VIS    2025250    183200   18.6000  148.0100      10.3        33       939        97
VIS    2025250    183200   18.6000  147.9700       9.6        47       904        91
VIS    2025250    183200   18.6100  147.9600      10.2        45       891        94
VIS    2025250    183200   18.6100  147.9400      10.4        43       874        91
VIS    2025250    183200   18.5900  147.9000       8.7        49       843        91
VIS    2025250    183200   18.6100  147.8700      10.2        46       835        91
VIS    2025250    183200   18.6100  147.8500      11.6        42       846        94
VIS    2025250    183200   18.6100  147.8200      11.1        41       867        97
VIS    2025250    183200   18.5900  147.7900      10.6        42       875        99
VIS    2025250    183200   18.6100  147.7800      10.6        43       883        98
VIS    2025250    183200   18.5900  147.7500      11.3        40       875        95
VIS    2025250    183200   18.6100  147.7200      11.6        42       883        96
VIS    2025250    183200   18.6000  147.6900      11.6        42       906        97
VIS    2025250    183200   18.6000  147.6900      11.5        42       906        97
VIS    2025250    183200   18.6100  147.6500      11.5        41       915        98
VIS    2025250    183200   18.6100  147.6400      11.4        41       910        98
VIS    2025250    183200   18.6100  147.6100      10.6        45       888        95
VIS    2025250    183200   18.6000  147.5700       9.6        55       818        93
VIS    2025250    183200   18.6100  147.5700      10.3        49       789        93
VIS    2025250    183200   18.6000  147.5100      10.2        44       783        91
VIS    2025250    183200   18.6100  147.4800       9.6        56       731        94
VIS    2025250    183200   18.5900  147.4600      10.2        55       748        97
VIS    2025250    183200   18.6100  147.4200      11.1        45       823        94
VIS    2025250    183200   18.6000  147.4100      12.1        39       852        93
VIS    2025250    183200   18.5900  147.3700      11.8        35       911        95
VIS    2025250    183200   18.5900  147.3700      11.7        34       911        95
VIS    2025250    183200   18.6000  147.3300      10.4        43       913        93
VIS    2025250    183200   18.5900  147.3000       9.5        48       745        90
VIS    2025250    183200   18.6100  147.2500      11.3        40       736        91
VIS    2025250    183200   18.5900  147.2400      11.3        40       767        90
VIS    2025250    183200   18.6000  147.2100      12.6        40       760        92
VIS    2025250    183200   18.5900  147.1800      13.3        40       789        92
VIS    2025250    183200   18.5900  147.1600      12.9        41       799        93
VIS    2025250    183200   18.6000  147.1500      12.3        42       758        93
VIS    2025250    183200   18.6000  147.1200      11.0        45       743        95
VIS    2025250    183200   18.6000  147.0300      11.2        42       702        95
VIS    2025250    183200   18.5900  147.0200      11.3        42       708        95
VIS    2025250    183200   18.5900  145.5200      14.8        67       188        93
VIS    2025250    183200   18.5800  145.4100      15.4        82       177        95
VIS    2025250    183200   18.5700  145.2400      16.6       126       161        90
VIS    2025250    183200   18.5800  145.0400      15.7       135       147        94
VIS    2025250    183200   18.5700  144.6200      11.7       146       152        90
VIS    2025250    183200   18.5800  144.5300      16.9       158       158        93
VIS    2025250    183200   18.5600  144.3000      17.6       149       167        93
VIS    2025250    183200   18.6200  150.7700       7.0        58       985        93
VIS    2025250    183200   18.6200  150.7600       6.9        56       985        93
VIS    2025250    183200   18.5800  148.7900      10.1        29       987        91
VIS    2025250    183200   18.5800  148.7800      10.0        29       980        93
VIS    2025250    183200   18.5900  148.7600       9.6        28       963        98
VIS    2025250    183200   18.5800  148.7200       8.8        38       937        96
VIS    2025250    183200   18.5800  148.7000       8.7        42       925        94
VIS    2025250    183200   18.5900  148.6700      10.0        40       900        97
VIS    2025250    183200   18.5900  148.6400      10.3        38       912        97
VIS    2025250    183200   18.5800  148.6300      10.0        40       904        97
VIS    2025250    183200   18.5900  148.6100      10.0        38       912        96
VIS    2025250    183200   18.6000  148.5700       9.6        45       925        95
VIS    2025250    183200   18.5800  148.5400       9.8        43       921        94
VIS    2025250    183200   18.5800  148.5400       9.9        42       913        93
VIS    2025250    183200   18.5800  148.5000       9.0        44       895        95
VIS    2025250    183200   18.5800  148.4800       9.3        45       892        95
VIS    2025250    183200   18.6000  148.4500      10.6        41       912        96
VIS    2025250    183200   18.5800  148.4200      10.3        39       931        94
VIS    2025250    183200   18.6000  148.4100      10.2        38       931        96
VIS    2025250    183200   18.5900  148.3800      10.1        39       910        92
VIS    2025250    183200   18.5900  148.3400      10.3        40       948        92
VIS    2025250    183200   18.5800  148.3300      10.2        41       941        95
VIS    2025250    183200   18.5900  148.3000      10.7        38       907        93
VIS    2025250    183200   18.5900  148.2900      10.9        38       903        93
VIS    2025250    183200   18.5800  148.2600      11.5        41       893        91
VIS    2025250    183200   18.5700  148.2200      11.6        41       937        97
VIS    2025250    183200   18.5700  148.2000      11.4        40       960        95
VIS    2025250    183200   18.5800  148.1800      10.7        36       975        98
VIS    2025250    183200   18.5700  148.1500      10.6        31       970        99
VIS    2025250    183200   18.5800  148.1400      10.4        32       970        99
VIS    2025250    183200   18.5800  148.1000      10.8        42       930        97
VIS    2025250    183200   18.5700  148.0900      11.2        40       932        98
VIS    2025250    183200   18.5900  148.0500      11.7        37       937        98
VIS    2025250    183200   18.5900  148.0300      11.4        35       960        98
VIS    2025250    183200   18.5900  148.0200      10.9        33       960        98
VIS    2025250    183200   18.5900  147.9900       9.7        39       935        91
VIS    2025250    183200   18.5700  147.9400       9.1        46       901        94
VIS    2025250    183200   18.5700  147.9200       9.4        50       882        96
VIS    2025250    183200   18.5700  147.8800       9.7        46       845        99
VIS    2025250    183200   18.5800  147.8500      12.3        40       840        93
VIS    2025250    183200   18.5700  147.8200      12.3        38       848        93
VIS    2025250    183200   18.5800  147.8100      11.6        38       866        96
VIS    2025250    183200   18.5700  147.7900      10.4        41       870        99
VIS    2025250    183200   18.5700  147.7500      10.2        42       871        98
VIS    2025250    183200   18.5900  147.7500      11.2        40       868        95
VIS    2025250    183200   18.5900  147.7000      12.0        40       901        97
VIS    2025250    183200   18.5700  147.6900      11.9        38       906        97
VIS    2025250    183200   18.5800  147.6700      11.3        38       913        96
VIS    2025250    183200   18.5700  147.6300      11.4        36       910        98
VIS    2025250    183200   18.5700  147.6200      11.3        37       903        98
VIS    2025250    183200   18.5800  147.5800       9.6        50       863        95
VIS    2025250    183200   18.5700  147.5500       9.5        45       794        93
VIS    2025250    183200   18.5800  147.4800      11.6        46       752        92
VIS    2025250    183200   18.5700  147.4700      11.6        46       760        92
VIS    2025250    183200   18.5700  147.4500      11.4        41       767        93
VIS    2025250    183200   18.5600  147.4100      11.9        38       888        98
VIS    2025250    183200   18.5700  147.3800      12.1        36       911        95
VIS    2025250    183200   18.5800  147.3800      12.0        36       911        95
VIS    2025250    183200   18.5600  147.3500      11.2        36       911        95
VIS    2025250    183200   18.5700  147.3100       9.8        43       875        94
VIS    2025250    183200   18.5700  147.2900       9.6        46       745        91
VIS    2025250    183200   18.5600  147.2400      10.6        44       747        93
VIS    2025250    183200   18.5600  147.2200      11.3        44       784        94
VIS    2025250    183200   18.5800  147.1800      13.1        40       789        92
VIS    2025250    183200   18.5800  147.1600      12.9        40       813        93
VIS    2025250    183200   18.5700  147.1500      12.3        41       813        92
VIS    2025250    183200   18.5700  147.1300      11.8        44       743        91
VIS    2025250    183200   18.5600  147.0900      11.4        46       718        94
VIS    2025250    183200   18.5600  147.0200      10.9        45       702        95
VIS    2025250    183200   18.5600  147.0000      11.5        45       702        96
VIS    2025250    183200   18.5700  145.5400      15.5        71       188        93
VIS    2025250    183200   18.5500  145.4200      16.0        92       174        91
VIS    2025250    183200   18.5700  145.4000      14.8        85       174        91
VIS    2025250    183200   18.5600  145.3700      16.0       104       169        94
VIS    2025250    183200   18.5600  144.6100      11.7       146       152        91
VIS    2025250    183200   18.5500  144.3000      16.6       153       166        95
VIS    2025250    183200   18.5400  144.2600      13.8       148       170        99
VIS    2025250    183200   18.5400  144.2300      13.6       150       171        91
VIS    2025250    183200   18.5400  144.2100      13.1       151       174        93
VIS    2025250    183200   18.5700  148.7800      10.1        29       980        93
VIS    2025250    183200   18.5700  148.7800      10.0        29       975        94
VIS    2025250    183200   18.5500  148.7500       9.8        30       947        94
VIS    2025250    183200   18.5600  148.7100       8.7        40       919        94
VIS    2025250    183200   18.5700  148.7000       8.7        41       925        93
VIS    2025250    183200   18.5700  148.6700       9.5        43       900        98
VIS    2025250    183200   18.5500  148.6500       9.5        42       898        97
VIS    2025250    183200   18.5600  148.6200       9.8        41       901        96
VIS    2025250    183200   18.5600  148.5900       9.5        40       904        98
VIS    2025250    183200   18.5600  148.5600       9.7        42       901        98
VIS    2025250    183200   18.5700  148.5400       9.9        43       909        93
VIS    2025250    183200   18.5500  148.5100      10.0        43       893        95
VIS    2025250    183200   18.5600  148.5100       9.7        43       895        96
VIS    2025250    183200   18.5700  148.4700       9.7        44       889        94
VIS    2025250    183200   18.5700  148.4400      10.9        43       897        90
VIS    2025250    183200   18.5700  148.4200      10.4        40       931        93
VIS    2025250    183200   18.5700  148.4000       9.9        39       931        92
VIS    2025250    183200   18.5500  148.3800      10.2        40       927        96
VIS    2025250    183200   18.5600  148.3500      10.3        44       910        96
VIS    2025250    183200   18.5500  148.3300      10.0        42       909        98
VIS    2025250    183200   18.5600  148.3000      10.0        41       921        96
VIS    2025250    183200   18.5500  148.2600      10.5        45       909        95
VIS    2025250    183200   18.5500  148.2600      10.6        45       909        98
VIS    2025250    183200   18.5700  148.2300      11.6        41       932        97
VIS    2025250    183200   18.5600  148.2000      11.1        38       960        97
VIS    2025250    183200   18.5500  148.1600      10.7        32       981        98
VIS    2025250    183200   18.5500  148.1400      10.7        31       970        98
VIS    2025250    183200   18.5500  148.1300      10.7        33       962        98
VIS    2025250    183200   18.5700  148.0900      11.3        39       937        97
VIS    2025250    183200   18.5600  148.0800      11.5        38       939        96
VIS    2025250    183200   18.5600  148.0400      11.8        35       945        97
VIS    2025250    183200   18.5500  148.0300      12.0        32       950        97
VIS    2025250    183200   18.5500  148.0000      11.6        29       950        99
VIS    2025250    183200   18.5500  147.9900      11.1        33       939        99
VIS    2025250    183200   18.5700  147.9500       9.2        44       930        90
VIS    2025250    183200   18.5600  147.9200       9.2        48       896        96
VIS    2025250    183200   18.5500  147.9100       8.9        48       883        97
VIS    2025250    183200   18.5400  147.8800       9.6        42       845        98
VIS    2025250    183200   18.5400  147.8600      10.7        39       844        96
VIS    2025250    183200   18.5500  147.8400      12.0        36       844        92
VIS    2025250    183200   18.5500  147.8000      11.9        34       857        94
VIS    2025250    183200   18.5500  147.7800      10.9        39       870        98
VIS    2025250    183200   18.5600  147.7500      10.1        40       871        95
VIS    2025250    183200   18.5400  147.7400       9.9        37       879        91
VIS    2025250    183200   18.5500  147.6800      11.7        36       906        95
VIS    2025250    183200   18.5500  147.6500      11.4        33       922        93
VIS    2025250    183200   18.5500  147.6300      11.6        34       917        94
VIS    2025250    183200   18.5600  147.6100      11.5        37       903        98
VIS    2025250    183200   18.5400  147.5800      11.0        39       894        97
VIS    2025250    183200   18.5500  147.5600      10.4        42       827        95
VIS    2025250    183200   18.5400  147.5300       9.9        43       807        93
VIS    2025250    183200   18.5400  147.5000      10.7        45       767        90
VIS    2025250    183200   18.5500  147.4900      11.6        43       766        90
VIS    2025250    183200   18.5600  147.4500      11.7        38       772        91
VIS    2025250    183200   18.5500  147.4300      12.0        35       867        95
VIS    2025250    183200   18.5600  147.4100      12.1        37       888        98
VIS    2025250    183200   18.5400  147.3800      12.4        38       922        99
VIS    2025250    183200   18.5500  147.3700      12.1        36       911        97
VIS    2025250    183200   18.5500  147.3400      11.1        37       906        96
VIS    2025250    183200   18.5400  147.3100       9.6        43       771        91
VIS    2025250    183200   18.5400  147.2900       9.3        47       769        93
VIS    2025250    183200   18.5400  147.2700       9.4        48       709        93
VIS    2025250    183200   18.5500  147.2400      10.3        48       733        94
VIS    2025250    183200   18.5600  147.2100      11.4        45       792        94
VIS    2025250    183200   18.5400  147.1900      11.7        45       809        92
VIS    2025250    183200   18.5400  147.1100      12.4        43       708        91
VIS    2025250    183200   18.5600  147.0100      11.3        45       702        95
VIS    2025250    183200   18.5600  147.0000      11.8        46       701        96
VIS    2025250    183200   18.5200  145.3900      18.0        98       170        90
VIS    2025250    183200   18.5300  145.3600      16.4       106       169        92
VIS    2025250    183200   18.5300  145.3600      16.2       105       169        94
VIS    2025250    183200   18.5400  145.1800      14.0       134       152        93
VIS    2025250    183200   18.5400  145.1500      12.7       129       152        95
VIS    2025250    183200   18.5400  144.9100      13.6       130       149        90
VIS    2025250    183200   18.5300  144.7400      16.5       145       155        95
VIS    2025250    183200   18.5200  144.6700      18.7       151       152        92
VIS    2025250    183200   18.5200  144.5700      14.6       140       156        92
VIS    2025250    183200   18.5300  144.2600      14.5       147       170        97
VIS    2025250    183200   18.5100  144.2400      14.4       148       171        93
VIS    2025250    183200   18.5300  148.7800       9.0        35       971        92
VIS    2025250    183200   18.5400  148.7600       9.8        29       958        95
VIS    2025250    183200   18.5400  148.7100       9.1        37       915        97
VIS    2025250    183200   18.5400  148.7000       9.0        44       901        96
VIS    2025250    183200   18.5400  148.6700       9.2        49       899        96
VIS    2025250    183200   18.5400  148.6400       9.4        44       898        96
VIS    2025250    183200   18.5300  148.6200       9.7        45       907        95
VIS    2025250    183200   18.5400  148.5900       9.5        40       910        98
VIS    2025250    183200   18.5400  148.5800       9.5        39       910        98
VIS    2025250    183200   18.5300  148.5400      10.0        45       893        96
VIS    2025250    183200   18.5400  148.5300      10.0        45       893        96
VIS    2025250    183200   18.5400  148.5000      10.2        41       892        95
VIS    2025250    183200   18.5300  148.4800      10.5        41       888        94
VIS    2025250    183200   18.5300  148.4100      10.6        42       912        94
VIS    2025250    183200   18.5300  148.4100      10.5        41       912        94
VIS    2025250    183200   18.5400  148.3600      10.1        40       919        97
VIS    2025250    183200   18.5300  148.3400      10.0        41       901        97
VIS    2025250    183200   18.5300  148.3200       9.7        41       899        98
VIS    2025250    183200   18.5200  148.3000       9.5        41       899        98
VIS    2025250    183200   18.5400  148.2800      10.3        43       921        96
VIS    2025250    183200   18.5200  148.2500       9.8        40       947        97
VIS    2025250    183200   18.5400  148.2200      10.7        41       952        97
VIS    2025250    183200   18.5200  148.2000      11.0        37       959        98
VIS    2025250    183200   18.5300  148.1800      10.9        35       960        99
VIS    2025250    183200   18.5400  148.1600      10.8        31       970        99
VIS    2025250    183200   18.5400  148.1200      10.8        35       961        98
VIS    2025250    183200   18.5400  148.1100      10.8        35       957        98
VIS    2025250    183200   18.5200  148.0700      10.9        39       945        94
VIS    2025250    183200   18.5400  148.0400      12.2        35       945        96
VIS    2025250    183200   18.5400  148.0300      12.2        32       950        97
VIS    2025250    183200   18.5200  147.9900      11.7        28       934        99
VIS    2025250    183200   18.5400  147.9900      11.4        30       935        99
VIS    2025250    183200   18.5200  147.9500      11.3        36       947        98
VIS    2025250    183200   18.5300  147.9300      10.7        38       947        98
VIS    2025250    183200   18.5200  147.9100       9.9        41       945        96
VIS    2025250    183200   18.5200  147.8800       9.0        45       882        95
VIS    2025250    183200   18.5400  147.8500      10.9        38       848        95
VIS    2025250    183200   18.5400  147.8200      11.5        35       856        94
VIS    2025250    183200   18.5400  147.8200      11.5        35       856        94
VIS    2025250    183200   18.5300  147.7700      11.0        41       871        98
VIS    2025250    183200   18.5300  147.7700      11.1        41       880        98
VIS    2025250    183200   18.5400  147.6800      11.2        36       906        91
VIS    2025250    183200   18.5400  147.6600      11.1        33       913        91
VIS    2025250    183200   18.5400  147.6300      11.9        35       919        92
VIS    2025250    183200   18.5200  147.6200      11.8        36       917        93
VIS    2025250    183200   18.5300  147.5700      10.9        39       872        95
VIS    2025250    183200   18.5300  147.5500      10.6        42       827        92
VIS    2025250    183200   18.5200  147.5200      10.3        41       822        92
VIS    2025250    183200   18.5300  147.5200      10.2        41       807        91
VIS    2025250    183200   18.5200  147.4100      12.2        37       949        99
VIS    2025250    183200   18.5200  147.3800      12.4        38       939        97
VIS    2025250    183200   18.5200  147.3600      11.8        39       920        93
VIS    2025250    183200   18.5200  147.3400      11.1        40       904        94
VIS    2025250    183200   18.5100  147.3200       9.7        44       875        91
VIS    2025250    183200   18.5300  147.2900       9.2        49       770        92
VIS    2025250    183200   18.5300  147.2600       9.6        48       709        93
VIS    2025250    183200   18.5300  147.2500       9.8        48       713        93
VIS    2025250    183200   18.5300  147.2300      10.7        48       750        94
VIS    2025250    183200   18.5300  147.1900      11.6        45       789        91
VIS    2025250    183200   18.5200  147.0100      12.2        45       711        95
VIS    2025250    183200   18.5200  147.0000      12.4        45       711        95
VIS    2025250    183200   18.5200  145.5300      12.2        94       187        91
VIS    2025250    183200   18.5100  145.4300      14.8        99       174        92
VIS    2025250    183200   18.5100  145.3900      18.0        97       171        90
VIS    2025250    183200   18.5200  145.3600      16.8       101       169        93
VIS    2025250    183200   18.5000  145.3200      15.8        83       168        94
VIS    2025250    183200   18.5000  145.1700      13.0       133       147        93
VIS    2025250    183200   18.5000  145.1600      12.2       132       147        92
VIS    2025250    183200   18.5100  145.0600      16.8       138       148        90
VIS    2025250    183200   18.5000  144.9800      15.4       132       146        94
VIS    2025250    183200   18.5100  144.9700      15.5       133       146        94
VIS    2025250    183200   18.5000  144.9100      13.8       140       146        91
VIS    2025250    183200   18.5000  144.8800      14.9       138       154        90
VIS    2025250    183200   18.4900  144.5400      14.9       141       161        96
VIS    2025250    183200   18.5100  144.5300      14.9       146       161        92
VIS    2025250    183200   18.5000  144.2800      14.0       178       165        91
VIS    2025250    183200   18.5100  148.7500       9.5        32       960        97
VIS    2025250    183200   18.5200  148.7500       9.7        30       960        97
VIS    2025250    183200   18.5100  148.7200       9.7        32       915        97
VIS    2025250    183200   18.5100  148.6800       9.7        50       902        95
VIS    2025250    183200   18.5100  148.6600       9.3        49       903        96
VIS    2025250    183200   18.5000  148.6300       9.5        48       910        95
VIS    2025250    183200   18.5000  148.6200       9.5        48       928        93
VIS    2025250    183200   18.5200  148.5800       9.6        41       910        96
VIS    2025250    183200   18.5200  148.5800       9.7        41       901        96
VIS    2025250    183200   18.5200  148.5400      10.1        45       893        96
VIS    2025250    183200   18.5200  148.5300      10.4        43       892        94
VIS    2025250    183200   18.5100  148.4900      11.1        41       888        92
VIS    2025250    183200   18.5000  148.4800      10.8        42       885        93
VIS    2025250    183200   18.5100  148.4400      10.4        41       883        94
VIS    2025250    183200   18.5200  148.4100      10.4        42       895        95
VIS    2025250    183200   18.5000  148.3900       9.6        45       922        95
VIS    2025250    183200   18.5200  148.3600       9.8        40       925        96
VIS    2025250    183200   18.5100  148.3500       9.6        40       927        96
VIS    2025250    183200   18.5000  148.3200       9.7        39       901        96
VIS    2025250    183200   18.5100  148.2900       9.8        40       909        98
VIS    2025250    183200   18.5000  148.2700       9.9        36       934        99
VIS    2025250    183200   18.5100  148.2500       9.5        38       947        97
VIS    2025250    183200   18.5100  148.2100      10.2        38       959        97
VIS    2025250    183200   18.5100  148.2100      10.7        38       959        98
VIS    2025250    183200   18.5100  148.1600      10.8        35       959        96
VIS    2025250    183200   18.5000  148.1500      10.6        35       955        96
VIS    2025250    183200   18.5200  148.1200      10.6        34       949        97
VIS    2025250    183200   18.5000  148.1000      10.0        38       939        95
VIS    2025250    183200   18.5200  148.0700      10.8        39       945        94
VIS    2025250    183200   18.5000  148.0400      11.7        34       930        97
VIS    2025250    183200   18.5100  148.0200      11.9        30       934        97
VIS    2025250    183200   18.5200  147.9900      11.7        28       934        98
VIS    2025250    183200   18.5100  147.9800      11.3        28       930        99
VIS    2025250    183200   18.5100  147.9400      10.9        34       942        99
VIS    2025250    183200   18.5000  147.9200      11.2        33       945        98
VIS    2025250    183200   18.5000  147.9000      10.4        39       949        93
VIS    2025250    183200   18.5000  147.8800       9.4        44       915        91
VIS    2025250    183200   18.5000  147.8400      10.3        42       867        98
VIS    2025250    183200   18.5000  147.8300      10.5        41       865        98
VIS    2025250    183200   18.5100  147.7900      12.0        41       865        94
VIS    2025250    183200   18.4900  147.7700      11.9        42       868        96
VIS    2025250    183200   18.5100  147.7400      10.1        40       883        94
VIS    2025250    183200   18.5000  147.7300       9.6        42       887        93
VIS    2025250    183200   18.5000  147.6900      10.5        41       895        96
VIS    2025250    183200   18.4900  147.6800      10.7        41       898        97
VIS    2025250    183200   18.4900  147.6600      10.0        40       898        96
VIS    2025250    183200   18.4900  147.6400      10.2        41       913        96
VIS    2025250    183200   18.5100  147.6100      11.7        38       915        96
VIS    2025250    183200   18.5100  147.5700      10.8        41       872        91
VIS    2025250    183200   18.5100  147.5500      11.0        42       848        91
VIS    2025250    183200   18.5100  147.5300      10.6        40       832        92
VIS    2025250    183200   18.5100  147.5100      10.7        39       807        91
VIS    2025250    183200   18.5100  147.3900      12.4        38       955        98
VIS    2025250    183200   18.5000  147.3600      11.6        38       920        91
VIS    2025250    183200   18.5000  147.3400      10.6        40       911        92
VIS    2025250    183200   18.4900  147.3100       9.4        46       841        92
VIS    2025250    183200   18.5000  147.2500      10.0        49       709        90
VIS    2025250    183200   18.5000  147.2400      10.3        48       709        96
VIS    2025250    183200   18.5100  147.2000      11.6        45       756        94
VIS    2025250    183200   18.5100  147.1900      11.7        44       787        95
VIS    2025250    183200   18.4700  145.4800      14.7        86       176        91
VIS    2025250    183200   18.4800  145.4300      16.3        86       174        90
VIS    2025250    183200   18.4800  145.4000      16.4        90       171        90
VIS    2025250    183200   18.4900  145.3700      16.9       100       171        91
VIS    2025250    183200   18.4900  145.3500      16.0        96       169        95
VIS    2025250    183200   18.4800  145.3300      16.1        88       169        96
VIS    2025250    183200   18.4700  145.1600      14.2       129       147        91
VIS    2025250    183200   18.4900  145.0600      16.7       136       146        92
VIS    2025250    183200   18.4800  145.0400      15.0       134       140        94
VIS    2025250    183200   18.4700  145.0100      13.6       132       132        92
VIS    2025250    183200   18.4700  144.9900      14.1       132       138        96
VIS    2025250    183200   18.4700  144.9700      14.3       138       138        90
VIS    2025250    183200   18.4700  144.6000      16.0       170       163        93
VIS    2025250    183200   18.4700  144.5700      15.0       156       162        94
VIS    2025250    183200   18.4700  144.5500      15.4       143       162        97
VIS    2025250    183200   18.4800  148.7600       8.5        46       976        91
VIS    2025250    183200   18.5000  148.7400       9.1        36       960        94
VIS    2025250    183200   18.4800  148.7000       9.4        43       909        97
VIS    2025250    183200   18.4900  148.6800       9.1        46       906        98
VIS    2025250    183200   18.5000  148.6600       9.2        47       906        97
VIS    2025250    183200   18.4800  148.6400       9.4        43       927        96
VIS    2025250    183200   18.5000  148.6200       9.5        48       928        93
VIS    2025250    183200   18.4800  148.5900       9.2        46       944        93
VIS    2025250    183200   18.4900  148.5700       9.3        44       897        94
VIS    2025250    183200   18.4800  148.5300      10.2        43       885        93
VIS    2025250    183200   18.4900  148.5100      10.9        42       885        90
VIS    2025250    183200   18.4800  148.4900      11.2        43       881        90
VIS    2025250    183200   18.4800  148.4500      11.1        40       881        90
VIS    2025250    183200   18.4800  148.4300      10.6        39       881        90
VIS    2025250    183200   18.4800  148.4200      10.2        41       881        91
VIS    2025250    183200   18.4800  148.4000       9.5        45       890        95
VIS    2025250    183200   18.4900  148.3600       9.4        43       939        95
VIS    2025250    183200   18.5000  148.3500       9.3        41       941        95
VIS    2025250    183200   18.4900  148.3200       9.5        38       909        95
VIS    2025250    183200   18.4900  148.2700      10.3        34       938        95
VIS    2025250    183200   18.4700  148.2300      10.4        36       982        96
VIS    2025250    183200   18.4900  148.1900       9.9        37       967        97
VIS    2025250    183200   18.4800  148.1600      10.1        38       963        94
VIS    2025250    183200   18.4800  148.1400      10.4        36       952        94
VIS    2025250    183200   18.4900  148.1200      10.6        34       947        97
VIS    2025250    183200   18.4900  148.0800       9.6        39       937        93
VIS    2025250    183200   18.4900  148.0800       9.4        40       937        92
VIS    2025250    183200   18.4800  148.0500       9.7        39       923        90
VIS    2025250    183200   18.4800  148.0100      11.6        33       928        96
VIS    2025250    183200   18.4800  147.9800      10.9        27       935       100
VIS    2025250    183200   18.4700  147.9500      10.2        25       949        99
VIS    2025250    183200   18.4900  147.9200      11.4        32       945        98
VIS    2025250    183200   18.4800  147.9000      11.6        32       949        97
VIS    2025250    183200   18.4900  147.8700       9.3        44       905        93
VIS    2025250    183200   18.4800  147.8400       9.5        44       875        99
VIS    2025250    183200   18.4800  147.8300       9.9        42       865        98
VIS    2025250    183200   18.4900  147.7900      11.6        42       865        95
VIS    2025250    183200   18.4800  147.7600      11.5        42       871        96
VIS    2025250    183200   18.4700  147.7500      11.1        42       885        97
VIS    2025250    183200   18.4700  147.7100      10.1        38       886        95
VIS    2025250    183200   18.4800  147.7000      10.0        40       891        96
VIS    2025250    183200   18.4700  147.6700      10.9        39       895        97
VIS    2025250    183200   18.4700  147.6500      10.5        39       896        96
VIS    2025250    183200   18.4700  147.6300       9.9        43       915        96
VIS    2025250    183200   18.4900  147.6100      10.9        40       917        98
VIS    2025250    183200   18.4700  147.5700      12.2        40       891        94
VIS    2025250    183200   18.4700  147.5600      12.5        39       873        94
VIS    2025250    183200   18.4800  147.5200      11.1        38       861        93
VIS    2025250    183200   18.4700  147.5100      10.6        38       864        93
VIS    2025250    183200   18.4800  147.4300      10.8        41       820        92
VIS    2025250    183200   18.4700  147.3700      12.2        33       965        97
VIS    2025250    183200   18.4700  147.3400      12.2        31       950        98
VIS    2025250    183200   18.4700  147.3400      11.8        32       946        97
VIS    2025250    183200   18.4800  147.3100       9.9        42       841        91
VIS    2025250    183200   18.4600  145.5800      14.2        86       189        97
VIS    2025250    183200   18.4500  145.5300      17.7        88       180        90
VIS    2025250    183200   18.4500  145.5000      16.0        80       177        93
VIS    2025250    183200   18.4600  145.4600      15.7        87       174        96
VIS    2025250    183200   18.4500  145.4300      16.5        87       172        90
VIS    2025250    183200   18.4700  145.4100      16.2        89       171        93
VIS    2025250    183200   18.4600  145.3300      16.2        86       168        95
VIS    2025250    183200   18.4400  145.1000      15.0       121       136        96
VIS    2025250    183200   18.4500  145.0700      13.9       127       136        97
VIS    2025250    183200   18.4400  145.0400      13.0       133       133        95
VIS    2025250    183200   18.4400  145.0300      13.0       134       133        95
VIS    2025250    183200   18.4600  145.0100      13.1       135       132        90
VIS    2025250    183200   18.4600  144.9900      13.6       134       132        93
VIS    2025250    183200   18.4500  144.9600      13.4       135       138        90
VIS    2025250    183200   18.4400  144.9300      14.0       135       138        93
VIS    2025250    183200   18.4500  144.9100      13.5       136       138        96
VIS    2025250    183200   18.4600  144.6000      15.2       169       163        94
VIS    2025250    183200   18.4600  144.1500      15.1       161       176        92
VIS    2025250    183200   18.4700  148.7000       9.4        44       909        97
VIS    2025250    183200   18.4600  148.6800       9.1        46       930        95
VIS    2025250    183200   18.4600  148.6600       9.0        45       930        95
VIS    2025250    183200   18.4700  148.6500       9.1        43       930        95
VIS    2025250    183200   18.4500  148.6000       9.1        45       944        95
VIS    2025250    183200   18.4600  148.5900       9.1        44       944        94
VIS    2025250    183200   18.4600  148.5700       8.9        45       904        98
VIS    2025250    183200   18.4500  148.5500       9.2        44       891        99
VIS    2025250    183200   18.4700  148.5200      10.4        43       881        95
VIS    2025250    183200   18.4700  148.4800      11.1        42       878        90
VIS    2025250    183200   18.4700  148.4200      10.0        41       879        91
VIS    2025250    183200   18.4700  148.4000       9.5        43       885        95
VIS    2025250    183200   18.4600  148.3700       9.9        44       906        96
VIS    2025250    183200   18.4500  148.2000      10.6        35       995        97
VIS    2025250    183200   18.4500  148.1900      10.2        34       988        97
VIS    2025250    183200   18.4600  148.1700       9.8        38       975        93
VIS    2025250    183200   18.4500  148.1300      10.3        39       961        94
VIS    2025250    183200   18.4700  148.1100      10.6        36       947        95
VIS    2025250    183200   18.4700  148.1000      10.6        36       947        95
VIS    2025250    183200   18.4600  148.0600       9.7        37       935        93
VIS    2025250    183200   18.4600  148.0500      10.2        37       927        95
VIS    2025250    183200   18.4500  147.9800      10.7        30       972        99
VIS    2025250    183200   18.4700  147.9500      10.1        24       957        99
VIS    2025250    183200   18.4600  147.9100      12.6        28       960        97
VIS    2025250    183200   18.4700  147.9100      12.5        29       960        97
VIS    2025250    183200   18.4500  147.8600       9.8        40       934        96
VIS    2025250    183200   18.4600  147.8400       9.4        43       882        99
VIS    2025250    183200   18.4500  147.8200       9.7        42       872        99
VIS    2025250    183200   18.4500  147.8100      10.3        43       863        99
VIS    2025250    183200   18.4500  147.7800      10.8        43       861        98
VIS    2025250    183200   18.4600  147.7400      10.6        40       886        94
VIS    2025250    183200   18.4500  147.7300      10.3        39       886        94
VIS    2025250    183200   18.4500  147.6900      10.1        38       894        94
VIS    2025250    183200   18.4600  147.6700      11.0        38       894        96
VIS    2025250    183200   18.4600  147.6400      10.1        42       897        96
VIS    2025250    183200   18.4600  147.6300      10.0        43       898        96
VIS    2025250    183200   18.4600  147.6100      10.6        43       915        97
VIS    2025250    183200   18.4600  147.5800      11.7        41       897        97
VIS    2025250    183200   18.4600  147.5500      12.5        39       873        93
VIS    2025250    183200   18.4500  147.5300      11.8        39       873        92
VIS    2025250    183200   18.4500  147.4900      10.3        38       873        94
VIS    2025250    183200   18.4400  147.4700      10.6        38       845        95
VIS    2025250    183200   18.4400  147.4600      11.4        35       831        94
VIS    2025250    183200   18.4500  147.4100      11.3        36       924        97
VIS    2025250    183200   18.4600  147.3700      12.2        33       969        98
VIS    2025250    183200   18.4600  147.3500      12.4        31       961        98
VIS    2025250    183200   18.4600  147.3400      12.6        30       961        98
VIS    2025250    183200   18.4600  147.3000      10.9        41       841        93
VIS    2025250    183200   18.4400  147.0000      12.6        46       704        94
VIS    2025250    183200   18.4300  145.6000      14.7        86       188        92
VIS    2025250    183200   18.4300  145.5100      16.8        84       177        93
VIS    2025250    183200   18.4300  145.5000      16.7        83       176        92
VIS    2025250    183200   18.4400  145.4700      16.1        80       172        90
VIS    2025250    183200   18.4400  145.4400      16.3        86       172        90
VIS    2025250    183200   18.4400  145.4200      16.5        90       172        95
VIS    2025250    183200   18.4200  145.4000      16.7        92       174        94
VIS    2025250    183200   18.4300  145.3800      15.9        95       173        92
VIS    2025250    183200   18.4300  145.1900      15.7       128       149        97
VIS    2025250    183200   18.4200  145.1700      14.0       117       141        97
VIS    2025250    183200   18.4200  145.0900      12.7       120       129        93
VIS    2025250    183200   18.4200  145.0800      12.8       122       133        95
VIS    2025250    183200   18.4300  145.0400      12.2       133       129        94
VIS    2025250    183200   18.4400  145.0400      12.8       133       133        94
VIS    2025250    183200   18.4200  144.9900      12.3       130       132        91
VIS    2025250    183200   18.4300  144.9700      13.5       133       132        92
VIS    2025250    183200   18.4300  144.9200      12.8       139       138        95
VIS    2025250    183200   18.4300  144.9200      13.0       139       138        95
VIS    2025250    183200   18.4300  144.5600      16.6       167       170        91
VIS    2025250    183200   18.4100  144.3600      12.2       174       161        90
VIS    2025250    183200   18.4100  144.0700      16.4       158       181        92
VIS    2025250    183200   18.4200  143.8900      15.3       160       188        92
VIS    2025250    183200   18.4300  148.9800       9.0        17       996        98
VIS    2025250    183200   18.4400  148.9800       8.9        17       996        98
VIS    2025250    183200   18.4300  148.7000       9.3        49       901        92
VIS    2025250    183200   18.4400  148.6600       9.4        51       934        90
VIS    2025250    183200   18.4500  148.6100       9.0        45       933        95
VIS    2025250    183200   18.4300  148.5800       8.9        47       916        96
VIS    2025250    183200   18.4300  148.5600       9.2        45       910        98
VIS    2025250    183200   18.4300  148.5500       9.2        45       904        98
VIS    2025250    183200   18.4300  148.5300       9.3        46       887        98
VIS    2025250    183200   18.4300  148.4900      10.0        44       876        95
VIS    2025250    183200   18.4400  148.4000       9.6        35       882        91
VIS    2025250    183200   18.4400  148.3800      10.0        37       899        95
VIS    2025250    183200   18.4400  148.2100      10.8        35       995        97
VIS    2025250    183200   18.4300  148.2000      10.7        34       998        96
VIS    2025250    183200   18.4400  148.1800      10.4        33       992        96
VIS    2025250    183200   18.4200  148.1400      10.6        31       965        92
VIS    2025250    183200   18.4200  148.1200      11.3        32       961        95
VIS    2025250    183200   18.4200  148.1000      11.6        34       952        97
VIS    2025250    183200   18.4400  148.0700      11.1        34       940        99
VIS    2025250    183200   18.4400  148.0600      10.9        34       935        98
VIS    2025250    183200   18.4300  147.9700      10.8        26       972        99
VIS    2025250    183200   18.4300  147.9400      10.8        21       973        96
VIS    2025250    183200   18.4300  147.9200      11.2        26       970        96
VIS    2025250    183200   18.4200  147.9000      11.7        27       970        97
VIS    2025250    183200   18.4200  147.8700      11.3        32       957        97
VIS    2025250    183200   18.4300  147.8600      10.6        36       944        97
VIS    2025250    183200   18.4400  147.8200       9.7        41       890        98
VIS    2025250    183200   18.4400  147.8100      10.0        42       863        99
VIS    2025250    183200   18.4400  147.7700      10.8        43       861        98
VIS    2025250    183200   18.4200  147.7400      10.9        39       886        97
VIS    2025250    183200   18.4300  147.7200      10.2        39       891        93
VIS    2025250    183200   18.4400  147.7200      10.1        38       891        93
VIS    2025250    183200   18.4300  147.6900       9.7        39       904        93
VIS    2025250    183200   18.4300  147.6500      10.5        40       898        96
VIS    2025250    183200   18.4200  147.6200      10.5        40       910        96
VIS    2025250    183200   18.4200  147.6000      10.6        42       903        96
VIS    2025250    183200   18.4300  147.5900      11.0        43       897        97
VIS    2025250    183200   18.4300  147.5700      11.1        43       885        96
VIS    2025250    183200   18.4200  147.5300      10.7        40       873        96
VIS    2025250    183200   18.4300  147.5000      10.2        38       880        95
VIS    2025250    183200   18.4400  147.4800      10.4        39       873        95
VIS    2025250    183200   18.4400  147.4500      11.5        35       831        94
VIS    2025250    183200   18.4200  147.4300      12.2        32       873        93
VIS    2025250    183200   18.4200  147.4100      12.6        31       897        96
VIS    2025250    183200   18.4200  147.3900      12.6        33       946        99
VIS    2025250    183200   18.4300  147.3600      12.9        33       969        99
VIS    2025250    183200   18.4300  147.3500      13.2        32       969        98
VIS    2025250    183200   18.4300  147.3000      11.4        42       911        97
VIS    2025250    183200   18.4300  147.2800       9.9        57       707        90
VIS    2025250    183200   18.4300  147.0000      12.8        47       704        93
VIS    2025250    183200   18.4200  146.9700      13.4        59       731        95
VIS    2025250    183200   18.4000  145.5200      16.6        92       176        93
VIS    2025250    183200   18.4200  145.5100      16.9        88       176        94
VIS    2025250    183200   18.4100  145.4200      16.3        91       173        96
VIS    2025250    183200   18.4200  145.4000      16.7        92       173        95
VIS    2025250    183200   18.4000  145.3900      16.2        89       173        95
VIS    2025250    183200   18.4000  145.2300      15.8       104       142        91
VIS    2025250    183200   18.4100  145.1200      13.7       116       129        92
VIS    2025250    183200   18.4200  145.1000      12.7       120       129        91
VIS    2025250    183200   18.4100  145.0700      11.2       122       128        93
VIS    2025250    183200   18.4000  144.9100      11.2       141       133        93
VIS    2025250    183200   18.4100  144.6500      13.9       145       168        99
VIS    2025250    183200   18.4100  144.6200      13.8       149       170        98
VIS    2025250    183200   18.3900  144.1000      10.8       162       180        91
VIS    2025250    183200   18.4000  144.0700      16.2       159       180        91
VIS    2025250    183200   18.4100  148.7000       8.7        47       904        95
VIS    2025250    183200   18.4100  148.7000       8.7        44       901        95
VIS    2025250    183200   18.4300  148.6500       9.4        55       948        90
VIS    2025250    183200   18.4100  148.5800       9.0        48       916        95
VIS    2025250    183200   18.4200  148.5500       9.3        46       915        97
VIS    2025250    183200   18.4100  148.5500       9.3        46       912        97
VIS    2025250    183200   18.4000  148.5200       9.4        46       894        98
VIS    2025250    183200   18.4200  148.4900       9.8        45       876        96
VIS    2025250    183200   18.4200  148.4600      10.4        41       870        91
VIS    2025250    183200   18.4100  148.3500       9.4        45       933        94
VIS    2025250    183200   18.4000  148.3500       9.1        45       937        93
VIS    2025250    183200   18.4100  148.1600      10.2        27       992        94
VIS    2025250    183200   18.4200  148.1400      10.8        29       965        91
VIS    2025250    183200   18.4100  148.1200      11.5        28       965        91
VIS    2025250    183200   18.4100  148.1000      11.5        32       952        97
VIS    2025250    183200   18.4000  148.0700      11.0        33       940        99
VIS    2025250    183200   18.4000  148.0400      11.3        33       945        99
VIS    2025250    183200   18.4200  148.0300      11.2        34       945        99
VIS    2025250    183200   18.4200  147.9400      10.5        27       983        91
VIS    2025250    183200   18.4200  147.9300      10.7        27       975        94
VIS    2025250    183200   18.4100  147.8900      11.5        26       970        96
VIS    2025250    183200   18.4000  147.8800      11.5        29       970        92
VIS    2025250    183200   18.4100  147.8600      10.9        32       945        94
VIS    2025250    183200   18.4200  147.8300      10.0        37       915        95
VIS    2025250    183200   18.4000  147.8000      10.1        39       874        97
VIS    2025250    183200   18.4100  147.7800      10.7        41       872        99
VIS    2025250    183200   18.4000  147.7600      11.3        39       874        97
VIS    2025250    183200   18.4200  147.7400      10.9        39       889        94
VIS    2025250    183200   18.3900  147.7000      10.4        32       924        95
VIS    2025250    183200   18.4000  147.6700      10.3        37       926        96
VIS    2025250    183200   18.4100  147.6500      10.2        41       913        96
VIS    2025250    183200   18.3900  147.6400      10.5        39       913        96
VIS    2025250    183200   18.4100  147.6000      10.5        41       903        96
VIS    2025250    183200   18.4000  147.5800      10.3        41       885        96
VIS    2025250    183200   18.3900  147.5500      10.1        42       873        97
VIS    2025250    183200   18.4100  147.5300      10.5        41       875        96
VIS    2025250    183200   18.4100  147.5000      10.5        39       888        95
VIS    2025250    183200   18.4100  147.4900      10.6        39       891        95
VIS    2025250    183200   18.3900  147.4600      11.3        37       882        95
VIS    2025250    183200   18.3900  147.4300      12.2        32       879        93
VIS    2025250    183200   18.4100  147.4200      12.6        30       879        93
VIS    2025250    183200   18.3900  147.3700      12.6        35       946        99
VIS    2025250    183200   18.3900  147.3600      12.4        37       963        99
VIS    2025250    183200   18.3900  147.3400      12.5        40       966        98
VIS    2025250    183200   18.3900  147.3100      11.3        50       917        92
VIS    2025250    183200   18.4100  147.2800       9.3        60       728        92
VIS    2025250    183200   18.4000  147.2600       9.2        64       707        92
VIS    2025250    183200   18.3800  145.6600      16.6        95       188        91
VIS    2025250    183200   18.3700  145.5400      15.1        98       172        92
VIS    2025250    183200   18.3700  145.5300      14.9        98       172        94
VIS    2025250    183200   18.3700  145.5100      14.0        91       173        95
VIS    2025250    183200   18.3800  145.4700      14.7        82       173        91
VIS    2025250    183200   18.3800  145.4300      16.6        87       173        94
VIS    2025250    183200   18.3800  145.4100      16.2        80       173        93
VIS    2025250    183200   18.3800  145.3900      16.2        79       173        93
VIS    2025250    183200   18.3800  145.0900      11.4       118       126        91
VIS    2025250    183200   18.3700  144.8000      11.8       134       150        90
VIS    2025250    183200   18.3700  144.7700      12.6       136       151        93
VIS    2025250    183200   18.3800  144.7200      20.3       154       155        90
VIS    2025250    183200   18.3800  144.6600      13.6       146       167        98
VIS    2025250    183200   18.3900  144.6500      13.9       143       167        99
VIS    2025250    183200   18.3700  144.6200      14.6       143       169        90
VIS    2025250    183200   18.3800  144.3400      13.1       173       164        90
VIS    2025250    183200   18.3800  144.1000      10.5       162       180        91
VIS    2025250    183200   18.4000  148.6900       9.0        42       904        98
VIS    2025250    183200   18.3900  148.6800       9.1        42       904        96
VIS    2025250    183200   18.3900  148.5900       9.3        50       922        92
VIS    2025250    183200   18.3900  148.5600       9.6        46       918        96
VIS    2025250    183200   18.3900  148.5500       9.7        46       918        96
VIS    2025250    183200   18.4000  148.5200       9.5        46       894        98
VIS    2025250    183200   18.3800  148.5000       9.3        45       885        99
VIS    2025250    183200   18.3800  148.4700       9.5        46       871        96
VIS    2025250    183200   18.4000  148.3600       9.3        42       922        91
VIS    2025250    183200   18.4000  148.3500       9.0        46       934        91
VIS    2025250    183200   18.3900  148.1500      11.1        22       980        91
VIS    2025250    183200   18.3900  148.1400      11.2        23       980        92
VIS    2025250    183200   18.3700  148.1200      11.4        32       967        94
VIS    2025250    183200   18.3800  148.0800      11.2        33       942        98
VIS    2025250    183200   18.3800  148.0500      11.2        33       939        99
VIS    2025250    183200   18.3900  148.0400      11.3        33       947        99
VIS    2025250    183200   18.3700  148.0000      11.7        31       967        97
VIS    2025250    183200   18.3800  147.9300      10.7        33       998        91
VIS    2025250    183200   18.3900  147.9000      10.7        30       998        94
VIS    2025250    183200   18.3900  147.8700      11.3        31       970        91
VIS    2025250    183200   18.3900  147.8300      10.1        37       915        92
VIS    2025250    183200   18.3800  147.8000      10.1        38       879        94
VIS    2025250    183200   18.3900  147.8000      10.0        38       876        96
VIS    2025250    183200   18.3700  147.7700      10.3        35       878        97
VIS    2025250    183200   18.3700  147.7400      11.1        33       897        94
VIS    2025250    183200   18.3800  147.7200      11.3        31       924        95
VIS    2025250    183200   18.3800  147.6900      11.2        31       965        96
VIS    2025250    183200   18.3800  147.6700      11.0        35       949        97
VIS    2025250    183200   18.3700  147.6300      10.4        34       920        95
VIS    2025250    183200   18.3900  147.6100      10.5        34       910        96
VIS    2025250    183200   18.3900  147.5800      10.7        36       894        96
VIS    2025250    183200   18.3900  147.5700      10.6        38       873        96
VIS    2025250    183200   18.3800  147.5300      10.8        41       876        98
VIS    2025250    183200   18.3700  147.5200      11.1        42       894        98
VIS    2025250    183200   18.3700  147.4900      11.3        42       906        97
VIS    2025250    183200   18.3900  147.4600      11.3        38       888        96
VIS    2025250    183200   18.3900  147.4400      12.0        33       879        94
VIS    2025250    183200   18.3900  147.4100      12.7        32       897        95
VIS    2025250    183200   18.3800  147.3800      12.5        35       899        97
VIS    2025250    183200   18.3800  147.3800      12.3        35       913        97
VIS    2025250    183200   18.3700  147.3500      11.6        40       963        97
VIS    2025250    183200   18.3900  147.3100      11.1        51       917        90
VIS    2025250    183200   18.3700  147.2900       9.7        60       728        93
VIS    2025250    183200   18.3700  147.0600      11.2        41       715        94
VIS    2025250    183200   18.3700  147.0600      11.1        40       733        94
VIS    2025250    183200   18.3700  147.0300      11.9        40       713        92
VIS    2025250    183200   18.3700  145.6800      16.0        92       188        92
VIS    2025250    183200   18.3700  145.5700      17.2        97       172        92
VIS    2025250    183200   18.3700  145.5600      16.4        97       172        95
VIS    2025250    183200   18.3700  145.5400      14.8        98       172        91
VIS    2025250    183200   18.3600  145.5200      13.4        91       171        90
VIS    2025250    183200   18.3500  145.4600      16.3        79       173        92
VIS    2025250    183200   18.3500  145.2800      17.6       117       152        92
VIS    2025250    183200   18.3600  145.1000      11.9       115       126        90
VIS    2025250    183200   18.3700  145.0600      10.6       121       130        91
VIS    2025250    183200   18.3600  144.9700      11.3       130       137        94
VIS    2025250    183200   18.3400  144.8900      12.9       130       143        96
VIS    2025250    183200   18.3500  144.8700       9.9       132       144        90
VIS    2025250    183200   18.3400  144.8200      11.4       140       146        90
VIS    2025250    183200   18.3500  144.7800      13.1       134       148        91
VIS    2025250    183200   18.3400  144.0700      14.3       159       185        93
VIS    2025250    183200   18.3700  148.5800       9.8        47       922        92
VIS    2025250    183200   18.3700  148.5700      10.1        44       919        95
VIS    2025250    183200   18.3700  148.5200      10.4        41       918        96
VIS    2025250    183200   18.3700  148.5200       9.9        43       907        97
VIS    2025250    183200   18.3600  148.4800       9.7        46       888        98
VIS    2025250    183200   18.3600  148.4600      10.1        46       876        95
VIS    2025250    183200   18.3600  148.4400      10.2        44       870        90
VIS    2025250    183200   18.3700  148.3300       8.7        49       941        90
VIS    2025250    183200   18.3600  148.3200       8.7        45       941        93
VIS    2025250    183200   18.3500  148.3000       9.1        39       964        97
VIS    2025250    183200   18.3700  148.2700       9.3        41       976        90
VIS    2025250    183200   18.3700  148.1200      11.3        32       977        94
VIS    2025250    183200   18.3600  148.0900      11.5        36       966        92
VIS    2025250    183200   18.3600  148.0700      11.7        34       950        97
VIS    2025250    183200   18.3500  148.0500      12.0        32       954        95
VIS    2025250    183200   18.3500  148.0200      11.7        30       964        96
VIS    2025250    183200   18.3600  148.0200      11.7        30       964        97
VIS    2025250    183200   18.3500  147.9900      12.8        28       984        90
VIS    2025250    183200   18.3500  147.9500      12.8        31       986        95
VIS    2025250    183200   18.3500  147.9400      12.6        33       986        96
VIS    2025250    183200   18.3500  147.8900      11.3        33       993        97
VIS    2025250    183200   18.3600  147.8500      10.5        36       981        95
VIS    2025250    183200   18.3500  147.8300      10.5        32       963        99
VIS    2025250    183200   18.3700  147.8100      10.3        36       907        96
VIS    2025250    183200   18.3500  147.7700       9.9        34       879        97
VIS    2025250    183200   18.3700  147.7500      10.5        34       879        93
VIS    2025250    183200   18.3500  147.7300      10.3        33       898        91
VIS    2025250    183200   18.3700  147.7200      11.1        31       924        94
VIS    2025250    183200   18.3700  147.6900      11.5        31       967        94
VIS    2025250    183200   18.3500  147.6300      10.4        32       929        94
VIS    2025250    183200   18.3500  147.6100      10.7        32       926        95
VIS    2025250    183200   18.3500  147.6000      11.1        31       920        96
VIS    2025250    183200   18.3500  147.5700      12.0        32       894        96
VIS    2025250    183200   18.3400  147.5300      11.9        37       868        95
VIS    2025250    183200   18.3500  147.5200      12.1        39       876        98
VIS    2025250    183200   18.3600  147.4900      11.4        41       906        97
VIS    2025250    183200   18.3500  147.4500      11.4        38       897        92
VIS    2025250    183200   18.3600  147.4400      11.7        36       897        92
VIS    2025250    183200   18.3600  147.4100      12.3        34       898        96
VIS    2025250    183200   18.3500  147.4000      12.0        35       898        96
VIS    2025250    183200   18.3500  147.3600      10.7        41       897        97
VIS    2025250    183200   18.3600  147.3400      10.6        43       917        96
VIS    2025250    183200   18.3400  147.3200       9.9        54       868        96
VIS    2025250    183200   18.3600  147.2900       9.7        60       728        93
VIS    2025250    183200   18.3400  147.0700      10.8        43       702        94
VIS    2025250    183200   18.3500  147.0400      11.0        37       720        93
VIS    2025250    183200   18.3400  147.0300      11.1        37       717        93
VIS    2025250    183200   18.3300  145.5700      17.7        90       171        92
VIS    2025250    183200   18.3300  145.5600      17.4        88       171        93
VIS    2025250    183200   18.3300  145.4700      16.5        76       174        92
VIS    2025250    183200   18.3200  145.3300      17.9        82       162        91
VIS    2025250    183200   18.3300  145.2900      16.7       103       150        91
VIS    2025250    183200   18.3200  145.2300      11.8       134       128        99
VIS    2025250    183200   18.3300  145.2200      11.5       133       128        99
VIS    2025250    183200   18.3400  145.1400      11.4       118       126        93
VIS    2025250    183200   18.3400  145.1100      11.6       119       127        91
VIS    2025250    183200   18.3300  145.0900      11.7       116       131        97
VIS    2025250    183200   18.3300  144.9400      11.5       130       137        92
VIS    2025250    183200   18.3300  144.9000      12.3       131       143        93
VIS    2025250    183200   18.3400  144.8800      13.1       131       144        97
VIS    2025250    183200   18.3400  144.8200      11.5       140       146        91
VIS    2025250    183200   18.3200  144.6500      16.9       167       159        91
VIS    2025250    183200   18.3400  144.3300      15.7       169       163        91
VIS    2025250    183200   18.3300  144.3000      15.3       166       163        93
VIS    2025250    183200   18.3100  144.0900      11.0       146       179        91
VIS    2025250    183200   18.3800  151.8900       6.6        49       987        90
VIS    2025250    183200   18.3500  148.7100       8.0        35       962        92
VIS    2025250    183200   18.3300  148.7000       8.9        31       980        90
VIS    2025250    183200   18.3500  148.5600      10.1        45       918        95
VIS    2025250    183200   18.3400  148.5200      10.4        44       904        93
VIS    2025250    183200   18.3300  148.4900      10.5        43       900        93
VIS    2025250    183200   18.3400  148.4800      10.5        44       888        94
VIS    2025250    183200   18.3300  148.4400      10.5        41       880        93
VIS    2025250    183200   18.3300  148.4300      10.7        40       874        91
VIS    2025250    183200   18.3300  148.3600      10.7        43       909        94
VIS    2025250    183200   18.3300  148.3400      10.3        42       931        96
VIS    2025250    183200   18.3500  148.3300       9.4        40       937        96
VIS    2025250    183200   18.3400  148.3000       9.3        36       942        98
VIS    2025250    183200   18.3300  148.2600      10.1        27       969        99
VIS    2025250    183200   18.3300  148.2600      10.1        26       969        99
VIS    2025250    183200   18.3400  148.0700      12.2        33       966        92
VIS    2025250    183200   18.3400  148.0500      11.9        32       966        95
VIS    2025250    183200   18.3400  148.0300      11.8        30       964        95
VIS    2025250    183200   18.3400  148.0000      12.2        28       978        92
VIS    2025250    183200   18.3400  147.9900      12.8        28       984        90
VIS    2025250    183200   18.3300  147.9600      12.7        25       974        93
VIS    2025250    183200   18.3400  147.9300      12.5        33       986        95
VIS    2025250    183200   18.3200  147.8900      12.1        33       986        97
VIS    2025250    183200   18.3200  147.8900      12.0        32       986        98
VIS    2025250    183200   18.3200  147.8400      11.3        24       963        99
VIS    2025250    183200   18.3200  147.8300      11.2        24       957       100
VIS    2025250    183200   18.3300  147.8000      10.4        29       929       100
VIS    2025250    183200   18.3200  147.7900      10.3        28       927        99
VIS    2025250    183200   18.3400  147.7600       9.9        34       879        97
VIS    2025250    183200   18.3400  147.7300      10.3        32       897        92
VIS    2025250    183200   18.3400  147.7100      11.0        31       924        93
VIS    2025250    183200   18.3300  147.6100      10.2        36       929        94
VIS    2025250    183200   18.3300  147.5700      11.8        35       897        97
VIS    2025250    183200   18.3300  147.5600      11.4        37       869        95
VIS    2025250    183200   18.3300  147.5400      11.8        37       860        96
VIS    2025250    183200   18.3200  147.5000      13.1        35       875        97
VIS    2025250    183200   18.3200  147.5000      13.1        34       875        96
VIS    2025250    183200   18.3200  147.4700      12.2        36       885        97
VIS    2025250    183200   18.3300  147.4300      12.0        34       908        95
VIS    2025250    183200   18.3400  147.4100      12.3        34       908        97
VIS    2025250    183200   18.3400  147.3800      11.2        38       886        96
VIS    2025250    183200   18.3200  147.3600      10.8        39       882        95
VIS    2025250    183200   18.3300  147.3500      10.0        43       886        95
VIS    2025250    183200   18.3200  147.3200      10.2        50       863        97
VIS    2025250    183200   18.3300  147.2400      10.4        44       722        96
VIS    2025250    183200   18.3200  147.2100      11.6        43       722        95
VIS    2025250    183200   18.3200  147.2000      11.7        43       722        95
VIS    2025250    183200   18.3100  147.0400      10.5        37       717        93
VIS    2025250    183200   18.3300  147.0200      10.8        38       706        94
VIS    2025250    183200   18.3100  145.6600      15.7        87       187        95
VIS    2025250    183200   18.3100  145.6500      15.9        91       185        94
VIS    2025250    183200   18.3000  145.6100      17.1        93       180        93
VIS    2025250    183200   18.3200  145.6100      17.5        93       175        92
VIS    2025250    183200   18.3100  145.5900      17.9        90       173        92
VIS    2025250    183200   18.3200  145.5600      17.3        86       171        93
VIS    2025250    183200   18.3000  145.4700      16.9        77       175        91
VIS    2025250    183200   18.3000  145.4600      16.9        76       175        90
VIS    2025250    183200   18.3100  145.3400      17.6        78       164        90
VIS    2025250    183200   18.3100  145.2400      11.5       133       128        99
VIS    2025250    183200   18.3000  145.2200      11.2       132       128        98
VIS    2025250    183200   18.3100  145.1200      11.7       107       128        92
VIS    2025250    183200   18.3200  145.0900      11.2       116       131        98
VIS    2025250    183200   18.3000  144.9500      11.5       132       144        96
VIS    2025250    183200   18.3100  144.9200      11.9       132       140        95
VIS    2025250    183200   18.3100  144.8800      15.4       126       144        98
VIS    2025250    183200   18.3100  144.8700      15.3       132       144        91
VIS    2025250    183200   18.3000  144.8500      11.8       134       149        93
VIS    2025250    183200   18.3100  144.6800      18.0       160       158        95
VIS    2025250    183200   18.2900  144.6500      16.5       166       159        92
VIS    2025250    183200   18.3100  144.3500      14.4       179       163        90
VIS    2025250    183200   18.3000  144.3300      13.3       176       165        90
VIS    2025250    183200   18.3100  144.3000      10.7       168       165        91
VIS    2025250    183200   18.3000  144.2200      12.8       183       169        98
VIS    2025250    183200   18.3000  144.2000      11.8       183       169        90
VIS    2025250    183200   18.2900  144.0800       8.6       144       182        91
VIS    2025250    183200   18.3000  144.0500      16.5       151       185        91
VIS    2025250    183200   18.2900  143.9100      11.5       177       187        93
VIS    2025250    183200   18.3100  148.7100       9.9        32       980        95
VIS    2025250    183200   18.3300  148.7000       8.9        30       980        91
VIS    2025250    183200   18.3200  148.5400       8.8        51       894        92
VIS    2025250    183200   18.3200  148.5300       8.6        50       893        94
VIS    2025250    183200   18.3200  148.4900      10.2        42       889        94
VIS    2025250    183200   18.3100  148.4800      10.2        42       889        93
VIS    2025250    183200   18.3000  148.4400      10.3        42       881        94
VIS    2025250    183200   18.3100  148.4300      10.5        42       880        93
VIS    2025250    183200   18.3100  148.3900      10.9        39       881        92
VIS    2025250    183200   18.3200  148.3600      11.0        42       887        93
VIS    2025250    183200   18.3100  148.3500      11.1        41       910        95
VIS    2025250    183200   18.3200  148.3200      10.0        38       941        97
VIS    2025250    183200   18.3000  148.3000       9.9        34       950        98
VIS    2025250    183200   18.3200  148.2700      10.3        29       969        99
VIS    2025250    183200   18.3100  148.2600      10.4        28       969        98
VIS    2025250    183200   18.3000  148.1500      12.1        37       988        96
VIS    2025250    183200   18.3100  148.1300      11.8        39       992        96
VIS    2025250    183200   18.3100  148.0800      10.8        36       999        91
VIS    2025250    183200   18.3100  148.0600      11.0        36       985        91
VIS    2025250    183200   18.3100  148.0200      11.9        35       977        95
VIS    2025250    183200   18.3000  148.0000      11.8        32       979        98
VIS    2025250    183200   18.3000  147.9900      11.7        31       979        98
VIS    2025250    183200   18.3200  147.9500      12.4        27       972        95
VIS    2025250    183200   18.3000  147.9200      12.1        32       967        97
VIS    2025250    183200   18.3000  147.9100      12.3        33       967        97
VIS    2025250    183200   18.3000  147.8700      11.6        26       967        99
VIS    2025250    183200   18.3100  147.8500      11.4        23       963        99
VIS    2025250    183200   18.3200  147.8300      11.2        24       957       100
VIS    2025250    183200   18.3000  147.7900      10.0        24       940        95
VIS    2025250    183200   18.3000  147.7900       9.9        23       930        96
VIS    2025250    183200   18.3000  147.7500      10.2        24       894        95
VIS    2025250    183200   18.3200  147.7400      10.4        28       886        90
VIS    2025250    183200   18.3200  147.7000      11.0        30       911        93
VIS    2025250    183200   18.3000  147.6800      12.0        28       911        94
VIS    2025250    183200   18.3200  147.6700      11.3        28       961        95
VIS    2025250    183200   18.3200  147.6200       9.6        34       955        93
VIS    2025250    183200   18.3200  147.6000      10.2        37       920        96
VIS    2025250    183200   18.3000  147.5700      11.6        38       885        97
VIS    2025250    183200   18.3000  147.5600      12.0        37       868        95
VIS    2025250    183200   18.2900  147.5400      12.3        34       856        91
VIS    2025250    183200   18.3100  147.5000      13.0        33       873        96
VIS    2025250    183200   18.3100  147.4900      13.0        33       875        96
VIS    2025250    183200   18.3100  147.4700      12.2        35       885        97
VIS    2025250    183200   18.3000  147.4400      11.9        34       915        98
VIS    2025250    183200   18.3100  147.4000      12.3        35       913        97
VIS    2025250    183200   18.2900  147.3800      12.1        34       888        97
VIS    2025250    183200   18.3000  147.3700      11.7        34       888        96
VIS    2025250    183200   18.3100  147.3500      10.8        38       868        92
VIS    2025250    183200   18.3100  147.3200      10.6        45       863        96
VIS    2025250    183200   18.3100  147.2800      10.2        57       708        93
VIS    2025250    183200   18.3100  147.2600      10.2        45       706        91
VIS    2025250    183200   18.2900  147.2300      12.1        31       763        90
VIS    2025250    183200   18.2900  147.2100      12.4        34       763        90
VIS    2025250    183200   18.2900  147.2000      12.3        38       752        91
VIS    2025250    183200   18.3000  147.0800      11.5        42       703        93
VIS    2025250    183200   18.2900  147.0400      11.2        38       705        92
VIS    2025250    183200   18.2900  147.0300      11.1        39       706        93
VIS    2025250    183200   18.2800  145.6800      16.1        90       190        92
VIS    2025250    183200   18.2900  145.6500      16.3        88       187        93
VIS    2025250    183200   18.3000  145.6100      17.2        93       180        92
VIS    2025250    183200   18.3000  145.5900      18.2        91       173        91
VIS    2025250    183200   18.3000  145.5900      18.3        90       172        91
VIS    2025250    183200   18.3000  145.5400      16.0        76       170        91
VIS    2025250    183200   18.3000  145.4700      16.7        77       175        90
VIS    2025250    183200   18.3000  145.4600      16.7        77       175        90
VIS    2025250    183200   18.2900  145.2100      10.9       131       128        95
VIS    2025250    183200   18.2900  144.9600      11.8       131       144        94
VIS    2025250    183200   18.2900  144.9500      11.6       133       147        94
VIS    2025250    183200   18.2800  144.9300      11.4       130       147        93
VIS    2025250    183200   18.2800  144.8800      14.4       123       151        98
VIS    2025250    183200   18.2900  144.8700      12.5       124       150        96
VIS    2025250    183200   18.2900  144.8500      11.1       126       150        94
VIS    2025250    183200   18.2700  144.6900      15.9       157       156        96
VIS    2025250    183200   18.2900  144.6600      17.3       165       158        92
VIS    2025250    183200   18.2800  144.2400      12.1       183       169        95
VIS    2025250    183200   18.2800  144.2100      12.3       183       169        98
VIS    2025250    183200   18.2900  144.2000      12.2       183       169        91
VIS    2025250    183200   18.2700  143.9000      12.7       177       187        94
VIS    2025250    183200   18.3000  148.7100      10.4        32       980        92
VIS    2025250    183200   18.3000  148.6800       9.6        34       980        98
VIS    2025250    183200   18.2800  148.6600       9.5        33       992        99
VIS    2025250    183200   18.2900  148.5300       8.5        44       909        97
VIS    2025250    183200   18.3000  148.5000       8.5        42       887        96
VIS    2025250    183200   18.2900  148.5000       8.4        41       887        95
VIS    2025250    183200   18.3000  148.4600       9.7        42       889        91
VIS    2025250    183200   18.2800  148.4400       9.4        45       893        96
VIS    2025250    183200   18.2800  148.4100       9.8        45       895        97
VIS    2025250    183200   18.2900  148.3900      10.1        43       882        96
VIS    2025250    183200   18.2900  148.3800      10.7        40       887        94
VIS    2025250    183200   18.3000  148.3500      10.9        40       893        95
VIS    2025250    183200   18.2900  148.3200       9.9        37       914        96
VIS    2025250    183200   18.3000  148.2900      10.1        34       962        97
VIS    2025250    183200   18.2800  148.2800      10.2        37       963        97
VIS    2025250    183200   18.2900  148.2500      10.7        33       976        96
VIS    2025250    183200   18.2900  148.1800      10.5        29       997        99
VIS    2025250    183200   18.2800  148.1800      10.4        31       978        99
VIS    2025250    183200   18.3000  148.1500      11.6        39       988        96
VIS    2025250    183200   18.2800  148.1200      11.1        41       988        94
VIS    2025250    183200   18.2900  148.0900      10.7        40       999        95
VIS    2025250    183200   18.3000  148.0400      11.0        34       973        97
VIS    2025250    183200   18.2900  147.9600      11.5        31       979        97
VIS    2025250    183200   18.2800  147.9500      11.2        33       979        97
VIS    2025250    183200   18.2800  147.9200      11.5        31       966        99
VIS    2025250    183200   18.2800  147.9000      11.6        29       964        99
VIS    2025250    183200   18.2700  147.8600      11.4        28       949        95
VIS    2025250    183200   18.2800  147.8600      11.4        27       949        94
VIS    2025250    183200   18.2900  147.8100      10.6        25       957        95
VIS    2025250    183200   18.2900  147.7900      10.1        24       949        93
VIS    2025250    183200   18.2900  147.7600      10.0        22       916        91
VIS    2025250    183200   18.2800  147.7400      10.0        23       886        90
VIS    2025250    183200   18.2700  147.7100      11.3        27       880        94
VIS    2025250    183200   18.2800  147.6700      12.7        26       903        93
VIS    2025250    183200   18.2800  147.6400      10.8        27       958        95
VIS    2025250    183200   18.2800  147.6400      10.6        28       957        95
VIS    2025250    183200   18.2800  147.5900      10.5        40       904        97
VIS    2025250    183200   18.2900  147.5800      11.6        40       880        98
VIS    2025250    183200   18.2900  147.5500      12.4        36       860        93
VIS    2025250    183200   18.2900  147.5200      11.7        31       854        91
VIS    2025250    183200   18.2900  147.5000      12.0        31       856        91
VIS    2025250    183200   18.2800  147.4700      12.3        34       873        96
VIS    2025250    183200   18.2900  147.4600      12.3        34       873        95
VIS    2025250    183200   18.2700  147.4200      11.1        34       946        98
VIS    2025250    183200   18.2800  147.3900      11.4        34       915        97
VIS    2025250    183200   18.2900  147.3800      12.0        34       888        96
VIS    2025250    183200   18.2800  147.3600      11.9        35       876        95
VIS    2025250    183200   18.2700  147.3400      11.2        39       844        93
VIS    2025250    183200   18.2700  147.3000      10.0        53       797        95
VIS    2025250    183200   18.2900  147.2800      10.3        56       710        94
VIS    2025250    183200   18.2900  147.2600       9.9        44       706        92
VIS    2025250    183200   18.2900  147.2300      11.9        29       763        90
VIS    2025250    183200   18.2900  147.2100      12.4        34       763        90
VIS    2025250    183200   18.2800  147.0300      11.2        39       706        93
VIS    2025250    183200   18.2700  145.6800      16.3        90       189        92
VIS    2025250    183200   18.2700  145.6800      16.4        90       189        92
VIS    2025250    183200   18.2600  145.6400      16.2        82       181        91
VIS    2025250    183200   18.2600  145.6300      16.5        82       179        90
VIS    2025250    183200   18.2500  145.5900      18.4        86       168        92
VIS    2025250    183200   18.2500  145.5700      17.4        79       165        91
VIS    2025250    183200   18.2500  145.0000      11.7       117       144        94
VIS    2025250    183200   18.2500  144.9900      11.3       114       147        91
VIS    2025250    183200   18.2500  144.9500      11.0       114       148        95
VIS    2025250    183200   18.2500  144.9300      11.9       122       148        96
VIS    2025250    183200   18.2500  144.9200      12.1       121       147        90
VIS    2025250    183200   18.2500  144.9000      13.5       127       151        97
VIS    2025250    183200   18.2600  144.8700      14.1       129       151        96
VIS    2025250    183200   18.2600  144.8200      11.4       137       151        91
VIS    2025250    183200   18.2500  144.7500      13.0       145       157        95
VIS    2025250    183200   18.2500  144.7100      14.7       153       156        98
VIS    2025250    183200   18.2600  144.6400      17.4       165       163        92
VIS    2025250    183200   18.2400  144.6200      17.1       166       165        97
VIS    2025250    183200   18.2500  144.5700      16.0       178       172        90
VIS    2025250    183200   18.2400  144.4100      15.6       187       185        91
VIS    2025250    183200   18.2600  144.1900      11.2       185       167        98
VIS    2025250    183200   18.2500  144.1100       8.3       170       177        93
VIS    2025250    183200   18.2500  143.9000      13.4       177       187        93
VIS    2025250    183200   18.2600  148.6700       9.4        30       989        99
VIS    2025250    183200   18.2700  148.5500       9.3        43       969        93
VIS    2025250    183200   18.2800  148.5200       8.7        41       959        91
VIS    2025250    183200   18.2800  148.4900       8.2        41       887        95
VIS    2025250    183200   18.2600  148.4800       8.7        40       889        93
VIS    2025250    183200   18.2700  148.4400       9.3        44       889        96
VIS    2025250    183200   18.2500  148.4200       8.6        46       896        99
VIS    2025250    183200   18.2500  148.4100       8.6        46       896        99
VIS    2025250    183200   18.2500  148.3800       9.0        45       893        99
VIS    2025250    183200   18.2700  148.3500      10.7        37       887        94
VIS    2025250    183200   18.2600  148.3400      10.7        37       887        94
VIS    2025250    183200   18.2700  148.3100      10.0        36       897        95
VIS    2025250    183200   18.2500  148.2900       9.5        38       897        97
VIS    2025250    183200   18.2500  148.2600       9.6        39       947        97
VIS    2025250    183200   18.2500  148.2200      10.1        35       996        98
VIS    2025250    183200   18.2700  148.2000       9.4        31       999        98
VIS    2025250    183200   18.2700  148.1900       9.3        30       997        98
VIS    2025250    183200   18.2600  148.1600       9.8        36       962        94
VIS    2025250    183200   18.2600  148.1100      10.6        40       970        94
VIS    2025250    183200   18.2600  148.0900      10.5        41       977        93
VIS    2025250    183200   18.2600  148.0500      10.5        32       977        99
VIS    2025250    183200   18.2600  148.0300      10.5        30       963        98
VIS    2025250    183200   18.2500  148.0100      10.5        34       944        98
VIS    2025250    183200   18.2700  147.9500      10.8        36       979        92
VIS    2025250    183200   18.2500  147.8800      11.7        25       965        96
VIS    2025250    183200   18.2600  147.8500      11.1        29       954        93
VIS    2025250    183200   18.2700  147.8200      10.4        32       961        91
VIS    2025250    183200   18.2700  147.7900      10.0        24       961        99
VIS    2025250    183200   18.2500  147.7700      10.6        34       961        99
VIS    2025250    183200   18.2500  147.7300      10.5        34       908        92
VIS    2025250    183200   18.2600  147.7200      10.5        32       882        91
VIS    2025250    183200   18.2600  147.6800      14.1        27       903        92
VIS    2025250    183200   18.2700  147.6700      13.5        26       907        93
VIS    2025250    183200   18.2500  147.6300      10.4        28       960        97
VIS    2025250    183200   18.2500  147.6100      10.2        33       957        97
VIS    2025250    183200   18.2600  147.5800      11.5        39       895        98
VIS    2025250    183200   18.2700  147.5700      12.5        38       876        97
VIS    2025250    183200   18.2700  147.5400      12.3        33       858        91
VIS    2025250    183200   18.2500  147.5100      10.6        37       858        94
VIS    2025250    183200   18.2400  147.4800      11.4        37       857        96
VIS    2025250    183200   18.2400  147.4700      12.0        34       860        99
VIS    2025250    183200   18.2400  147.4400      11.9        32       931        97
VIS    2025250    183200   18.2600  147.4100      11.1        33       946        98
VIS    2025250    183200   18.2600  147.4000      11.0        33       946        98
VIS    2025250    183200   18.2600  147.3500      11.1        39       858        94
VIS    2025250    183200   18.2600  147.2900      10.0        53       757        95
VIS    2025250    183200   18.2500  147.2100      11.5        36       759        92
VIS    2025250    183200   18.2400  147.1800      10.7        40       744        93
VIS    2025250    183200   18.2500  145.7200      13.2        87       186        97
VIS    2025250    183200   18.2400  145.6800      16.1        84       181        95
VIS    2025250    183200   18.2500  145.5700      17.1        78       165        91
VIS    2025250    183200   18.2300  144.9900      12.0       107       148        90
VIS    2025250    183200   18.2300  144.9700      12.1       104       148        94
VIS    2025250    183200   18.2300  144.9400      11.9       106       148        94
VIS    2025250    183200   18.2200  144.9300      12.5       111       148        91
VIS    2025250    183200   18.2400  144.9000      13.0       125       151        90
VIS    2025250    183200   18.2300  144.7400      13.7       146       157        94
VIS    2025250    183200   18.2400  144.7400      14.0       148       157        94
VIS    2025250    183200   18.2200  144.6400      16.4       158       165        97
VIS    2025250    183200   18.2200  144.6000      15.9       167       170        95
VIS    2025250    183200   18.2200  144.5900      15.6       171       170        93
VIS    2025250    183200   18.2200  144.5700      15.6       174       172        93
VIS    2025250    183200   18.2300  144.4800      12.6       169       176        90
VIS    2025250    183200   18.2300  144.4300      15.8       186       181        91
VIS    2025250    183200   18.2300  144.4100      15.2       188       184        90
VIS    2025250    183200   18.2200  144.4000      17.1       183       181        91
VIS    2025250    183200   18.2200  143.9600      21.5       168       191        91
VIS    2025250    183200   18.2200  143.8600      13.6       162       185        93
VIS    2025250    183200   18.2200  143.8400      16.9       157       187        97
VIS    2025250    183200   18.2500  148.6700       9.4        29       992        99
VIS    2025250    183200   18.2500  148.6700       9.5        30       989        99
VIS    2025250    183200   18.2300  148.6200       9.7        31       989        93
VIS    2025250    183200   18.2500  148.5600      10.0        43      1000        94
VIS    2025250    183200   18.2500  148.5000       9.0        38       937        94
VIS    2025250    183200   18.2500  148.4800       8.8        40       899        95
VIS    2025250    183200   18.2500  148.4500       8.9        39       892        93
VIS    2025250    183200   18.2400  148.4200       8.7        42       892        95
VIS    2025250    183200   18.2400  148.4100       8.5        44       893        98
VIS    2025250    183200   18.2400  148.3900       8.8        45       893        98
VIS    2025250    183200   18.2300  148.3600      10.4        40       884        92
VIS    2025250    183200   18.2400  148.3500      10.6        38       881        90
VIS    2025250    183200   18.2300  148.2800       9.0        38       892        97
VIS    2025250    183200   18.2300  148.2700       8.9        40       892        97
VIS    2025250    183200   18.2300  148.2400       9.6        36       947        95
VIS    2025250    183200   18.2300  148.2100      10.2        32       979        98
VIS    2025250    183200   18.2300  148.1900      10.0        32       996        97
VIS    2025250    183200   18.2500  148.1500       9.6        35       962        95
VIS    2025250    183200   18.2500  148.1200      10.2        39       968        90
VIS    2025250    183200   18.2300  148.0900      10.0        38       970        91
VIS    2025250    183200   18.2500  148.0600      10.2        35       972        98
VIS    2025250    183200   18.2300  148.0400       9.6        35       956        94
VIS    2025250    183200   18.2500  148.0100      10.6        35       944        98
VIS    2025250    183200   18.2300  147.9100      11.1        32       978        91
VIS    2025250    183200   18.2400  147.8900      11.6        26       975        96
VIS    2025250    183200   18.2400  147.8800      11.7        25       965        96
VIS    2025250    183200   18.2400  147.8500      11.5        30       961        92
VIS    2025250    183200   18.2300  147.8200      10.6        40       969        93
VIS    2025250    183200   18.2300  147.7900      10.1        39       961        93
VIS    2025250    183200   18.2400  147.7700      11.0        33       960        97
VIS    2025250    183200   18.2400  147.7400      10.4        39       928        94
VIS    2025250    183200   18.2400  147.7300      10.4        38       908        95
VIS    2025250    183200   18.2400  147.7000      12.3        28       882        97
VIS    2025250    183200   18.2200  147.6700      12.7        29       912        99
VIS    2025250    183200   18.2200  147.6400      12.3        28       934        99
VIS    2025250    183200   18.2300  147.6200      11.0        26       954        96
VIS    2025250    183200   18.2400  147.6000      10.1        35       946        95
VIS    2025250    183200   18.2300  147.5400      12.3        35       874        97
VIS    2025250    183200   18.2200  147.5300      11.9        35       874        96
VIS    2025250    183200   18.2400  147.4900      10.8        39       855        99
VIS    2025250    183200   18.2400  147.4600      11.9        34       860        99
VIS    2025250    183200   18.2300  147.4600      12.0        32       869        99
VIS    2025250    183200   18.2400  147.4400      11.9        32       931        97
VIS    2025250    183200   18.2400  147.4000      10.7        36       933        95
VIS    2025250    183200   18.2400  147.3800      10.4        37       888        95
VIS    2025250    183200   18.2400  147.3600      10.1        45       815        91
VIS    2025250    183200   18.2200  144.9700      12.5       100       148        94
VIS    2025250    183200   18.2000  144.7400      14.4       149       164        91
VIS    2025250    183200   18.2100  144.7100      15.3       150       163        94
VIS    2025250    183200   18.2100  144.6700      17.3       155       163        92
VIS    2025250    183200   18.2100  144.6400      15.9       161       165        96
VIS    2025250    183200   18.2000  144.6200      15.9       164       170        96
VIS    2025250    183200   18.2000  144.6000      16.4       170       170        95
VIS    2025250    183200   18.2100  144.5700      15.8       174       172        93
VIS    2025250    183200   18.1900  144.4800      16.1       182       177        91
VIS    2025250    183200   18.1900  144.3900      19.3       180       184        95
VIS    2025250    183200   18.1900  144.3800      18.9       180       184        95
VIS    2025250    183200   18.2000  144.2400      13.2       192       169        90
VIS    2025250    183200   18.1900  143.9700      20.6       169       190        93
VIS    2025250    183200   18.1900  143.9300      19.8       170       192        91
VIS    2025250    183200   18.2000  143.8500      17.8       159       187        90
VIS    2025250    183200   18.1900  143.8000      20.5       157       193        91
VIS    2025250    183200   18.2300  148.7300       9.8        22      1000        93
VIS    2025250    183200   18.2200  148.7100       9.8        22      1000        97
VIS    2025250    183200   18.2200  148.6800       9.8        28       976        97
VIS    2025250    183200   18.2100  148.6700       9.8        29       976        97
VIS    2025250    183200   18.2200  148.6300       9.6        31       989        91
VIS    2025250    183200   18.2300  148.6200       9.6        31       989        93
VIS    2025250    183200   18.2100  148.5800       8.8        29       962        97
VIS    2025250    183200   18.2100  148.5700       8.8        29       983        97
VIS    2025250    183200   18.2100  148.5200       9.8        31       991        96
VIS    2025250    183200   18.2300  148.4400       9.3        38       892        93
VIS    2025250    183200   18.2300  148.4200       9.0        41       892        95
VIS    2025250    183200   18.2200  148.3900       9.2        41       891        94
VIS    2025250    183200   18.2200  148.3600      10.4        42       888        95
VIS    2025250    183200   18.2000  148.3500      10.8        42       884        95
VIS    2025250    183200   18.2200  148.3100       9.9        36       876        95
VIS    2025250    183200   18.2100  148.2900       9.4        38       874        95
VIS    2025250    183200   18.2100  148.2700       8.8        40       881        99
VIS    2025250    183200   18.2200  148.2300       9.5        34       947        96
VIS    2025250    183200   18.2200  148.1300       9.5        37       980        90
VIS    2025250    183200   18.2100  148.1200       9.9        36       987        91
VIS    2025250    183200   18.2000  148.0700       9.7        37       968        91
VIS    2025250    183200   18.2200  148.0300       9.3        36       944        95
VIS    2025250    183200   18.2200  148.0100       9.9        35       930        95
VIS    2025250    183200   18.2100  148.0000      10.2        33       930        96
VIS    2025250    183200   18.2000  147.9600      11.2        28       982        98
VIS    2025250    183200   18.2000  147.9500      11.2        28       992        98
VIS    2025250    183200   18.2200  147.9000      11.4        29       978        93
VIS    2025250    183200   18.2000  147.8600      10.6        29       986        97
VIS    2025250    183200   18.2000  147.8300      10.3        34       970        90
VIS    2025250    183200   18.2100  147.8100      10.3        38       961        93
VIS    2025250    183200   18.2100  147.7700      11.0        39       934        94
VIS    2025250    183200   18.2000  147.7400      11.4        39       934        96
VIS    2025250    183200   18.2100  147.7200      10.9        37       934        92
VIS    2025250    183200   18.2100  147.7000      10.8        33       934        94
VIS    2025250    183200   18.2000  147.6600      11.9        30       912        99
VIS    2025250    183200   18.2100  147.6600      12.4        29       912        99
VIS    2025250    183200   18.2000  147.6200      12.8        25       934        95
VIS    2025250    183200   18.2200  147.5500      11.4        37       874        96
VIS    2025250    183200   18.2200  147.5300      11.8        36       874        96
VIS    2025250    183200   18.2200  147.4900      10.4        40       852        98
VIS    2025250    183200   18.2200  147.4900      10.3        40       852        97
VIS    2025250    183200   18.2200  147.4600      11.2        34       853        97
VIS    2025250    183200   18.2000  147.4200      10.4        41       880        93
VIS    2025250    183200   18.1900  147.4000       9.8        45       917        91
VIS    2025250    183200   18.2100  147.3700      10.3        42       917        94
VIS    2025250    183200   18.2100  147.3500      10.2        44       813        98
VIS    2025250    183200   18.2100  147.3200       9.6        50       768        95
VIS    2025250    183200   18.1900  147.2900       9.6        53       766        97
VIS    2025250    183200   18.2000  147.2900       9.4        55       750        95
VIS    2025250    183200   18.1900  144.7300      14.6       144       166        91
VIS    2025250    183200   18.1900  144.6900      16.3       154       163        96
VIS    2025250    183200   18.1800  144.6600      14.8       155       168        94
VIS    2025250    183200   18.1900  144.6500      15.3       156       168        94
VIS    2025250    183200   18.1900  144.6100      16.4       167       170        96
VIS    2025250    183200   18.1800  144.6100      17.1       171       170        96
VIS    2025250    183200   18.1800  144.5800      17.0       175       172        95
VIS    2025250    183200   18.1700  144.5500      17.4       180       173        92
VIS    2025250    183200   18.1800  144.5200      16.0       179       177        92
VIS    2025250    183200   18.1800  144.5000      15.5       178       178        91
VIS    2025250    183200   18.1700  144.4700      17.3       186       178        91
VIS    2025250    183200   18.1700  144.4600      18.0       191       180        90
VIS    2025250    183200   18.1900  144.3900      20.2       180       184        95
VIS    2025250    183200   18.1900  144.3800      19.4       179       184        95
VIS    2025250    183200   18.1700  144.3600      22.4       177       184        94
VIS    2025250    183200   18.1800  144.1700      13.5       194       170        90
VIS    2025250    183200   18.1700  143.9800      20.2       169       189        94
VIS    2025250    183200   18.1800  143.9600      20.4       170       190        92
VIS    2025250    183200   18.1800  143.9500      20.6       171       190        90
VIS    2025250    183200   18.1700  143.9300      22.4       170       193        90
VIS    2025250    183200   18.1600  143.8400      16.5       160       189        97
VIS    2025250    183200   18.1700  143.8200      19.0       157       189        94
VIS    2025250    183200   18.1700  143.8100      19.8       156       189        93
VIS    2025250    183200   18.2000  148.7300       9.5        25      1000        90
VIS    2025250    183200   18.1800  148.7100       8.9        33       976        93
VIS    2025250    183200   18.2000  148.6700       9.7        29       971        95
VIS    2025250    183200   18.1900  148.6600       9.6        30       971        96
VIS    2025250    183200   18.1800  148.6300       8.6        31       975        96
VIS    2025250    183200   18.1900  148.6000       8.6        30       979        95
VIS    2025250    183200   18.1900  148.5900       8.6        29       962        95
VIS    2025250    183200   18.1900  148.5500       8.8        29       973        96
VIS    2025250    183200   18.2000  148.5300       9.5        31       991        96
VIS    2025250    183200   18.2000  148.5200       9.6        30       991        96
VIS    2025250    183200   18.1900  148.4500       9.6        40       936        91
VIS    2025250    183200   18.2000  148.4200       9.5        40       891        95
VIS    2025250    183200   18.2000  148.4100       9.5        41       886        95
VIS    2025250    183200   18.1800  148.3800      10.2        41       879        95
VIS    2025250    183200   18.2000  148.3500      10.7        42       884        95
VIS    2025250    183200   18.1900  148.3400      10.5        41       883        96
VIS    2025250    183200   18.1900  148.3100      10.0        38       881        98
VIS    2025250    183200   18.1800  148.2700       9.0        39       880        98
VIS    2025250    183200   18.1900  148.2600       8.7        37       880       100
VIS    2025250    183200   18.1800  148.2300       8.8        33       931        94
VIS    2025250    183200   18.1800  148.2200       9.0        33       936        95
VIS    2025250    183200   18.1800  148.0300       9.9        31       957        96
VIS    2025250    183200   18.1900  148.0100      10.2        30       933        98
VIS    2025250    183200   18.2000  147.9800      11.1        29       947        98
VIS    2025250    183200   18.2000  147.9600      11.5        28       982        98
VIS    2025250    183200   18.1800  147.9500      11.7        25       992        96
VIS    2025250    183200   18.1800  147.9200      11.7        25       996        98
VIS    2025250    183200   18.1800  147.8900      10.7        30       997        97
VIS    2025250    183200   18.1700  147.7800      11.6        32       933        97
VIS    2025250    183200   18.1700  147.7700      11.7        33       933        97
VIS    2025250    183200   18.1700  147.7400      11.4        34       947        97
VIS    2025250    183200   18.1900  147.7100      11.0        36       949        95
VIS    2025250    183200   18.1900  147.6800      10.7        35       933        95
VIS    2025250    183200   18.1800  147.6700      10.6        33       933        96
VIS    2025250    183200   18.1900  147.6300      12.7        26       933        98
VIS    2025250    183200   18.1700  147.6100      12.3        27       934        97
VIS    2025250    183200   18.1800  147.6000      12.2        27       934        97
VIS    2025250    183200   18.1800  147.5600      10.9        34       889        98
VIS    2025250    183200   18.1900  147.5400      10.8        38       874        96
VIS    2025250    183200   18.1800  147.5100      11.3        36       874        97
VIS    2025250    183200   18.1900  147.5000      10.5        39       867        98
VIS    2025250    183200   18.1900  147.4700       9.5        41       841        95
VIS    2025250    183200   18.1800  147.4500       9.5        41       840        90
VIS    2025250    183200   18.1800  147.4200       9.9        41       876        90
VIS    2025250    183200   18.1800  147.4000       9.6        45       885        92
VIS    2025250    183200   18.1800  147.3600      10.6        39       814        98
VIS    2025250    183200   18.1800  147.3600      10.7        39       814        98
VIS    2025250    183200   18.1700  147.3200      11.2        37       807        98
VIS    2025250    183200   18.1800  147.3000      10.1        46       775        99
VIS    2025250    183200   18.1500  145.3600      11.5        79       152        91
VIS    2025250    183200   18.1500  145.0400      13.0        96       163        91
VIS    2025250    183200   18.1500  144.6900      15.6       164       176        93
VIS    2025250    183200   18.1500  144.6700      14.8       166       175        93
VIS    2025250    183200   18.1500  144.6000      15.6       171       173        90
VIS    2025250    183200   18.1500  144.6000      15.9       173       173        91
VIS    2025250    183200   18.1500  144.5700      16.5       177       177        93
VIS    2025250    183200   18.1500  144.5500      17.1       179       182        94
VIS    2025250    183200   18.1500  144.5100      17.3       183       182        92
VIS    2025250    183200   18.1500  144.4800      16.2       181       182        92
VIS    2025250    183200   18.1600  144.4600      17.2       188       180        90
VIS    2025250    183200   18.1600  144.4500      18.5       192       181        90
VIS    2025250    183200   18.1500  144.3900      25.1       180       183        94
VIS    2025250    183200   18.1400  144.3800      25.1       178       182        95
VIS    2025250    183200   18.1500  144.3400      22.6       178       181        96
VIS    2025250    183200   18.1400  144.3200      20.4       181       166        92
VIS    2025250    183200   18.1600  144.1700      12.7       191       170        95
VIS    2025250    183200   18.1500  144.1600      11.3       193       171        92
VIS    2025250    183200   18.1500  144.0500      13.2       171       182        95
VIS    2025250    183200   18.1600  143.9800      20.3       168       189        93
VIS    2025250    183200   18.1600  143.9500      20.4       171       190        92
VIS    2025250    183200   18.1500  143.9300      20.0       174       193        92
VIS    2025250    183200   18.1600  143.8400      16.0       164       189        92
VIS    2025250    183200   18.1600  143.8100      19.8       158       190        94
VIS    2025250    183200   18.1400  143.8000      18.4       166       194        97
VIS    2025250    183200   18.1600  148.7300       9.2        34       979        95
VIS    2025250    183200   18.1800  148.7000       8.9        35       974        93
VIS    2025250    183200   18.1800  148.6800       9.2        35       951        91
VIS    2025250    183200   18.1600  148.6600       9.0        34       927        94
VIS    2025250    183200   18.1700  148.6200       8.6        29       975        96
VIS    2025250    183200   18.1600  148.6100       8.6        29       967        96
VIS    2025250    183200   18.1600  148.5900       8.4        30       962        96
VIS    2025250    183200   18.1600  148.5600       8.2        36       949        94
VIS    2025250    183200   18.1700  148.5200       9.2        26       973        98
VIS    2025250    183200   18.1600  148.5100       9.7        22       969        99
VIS    2025250    183200   18.1700  148.4900      10.2        32       962        96
VIS    2025250    183200   18.1700  148.4500      10.0        39       936        93
VIS    2025250    183200   18.1700  148.4400      10.0        39       936        93
VIS    2025250    183200   18.1800  148.4200       9.9        39       886        97
VIS    2025250    183200   18.1800  148.3900      10.2        41       879        97
VIS    2025250    183200   18.1600  148.3600      10.6        40       874        92
VIS    2025250    183200   18.1800  148.3400      10.4        41       882        95
VIS    2025250    183200   18.1700  148.3200      10.3        38       881        95
VIS    2025250    183200   18.1700  148.3000      10.1        37       879        97
VIS    2025250    183200   18.1600  148.2300       9.2        36       931        94
VIS    2025250    183200   18.1600  148.2200       9.0        36       936        94
VIS    2025250    183200   18.1600  148.1600       9.9        40       992        92
VIS    2025250    183200   18.1700  148.0600      10.0        35       965        93
VIS    2025250    183200   18.1700  148.0400      10.2        31       962        96
VIS    2025250    183200   18.1700  148.0300      10.1        31       957        96
VIS    2025250    183200   18.1600  147.9800      10.8        31       949        96
VIS    2025250    183200   18.1700  147.9700      11.5        29       975        95
VIS    2025250    183200   18.1700  147.9400      11.8        26       992        96
VIS    2025250    183200   18.1700  147.8600      10.0        30       981        94
VIS    2025250    183200   18.1500  147.7800      10.5        35       947        96
VIS    2025250    183200   18.1500  147.7800      10.5        35       947        96
VIS    2025250    183200   18.1600  147.7300      11.2        33       947        97
VIS    2025250    183200   18.1600  147.7300      10.9        32       947        97
VIS    2025250    183200   18.1500  147.6900      10.5        32       960        94
VIS    2025250    183200   18.1700  147.6600      10.5        32       933        96
VIS    2025250    183200   18.1700  147.6400      11.4        29       933        97
VIS    2025250    183200   18.1700  147.6100      12.3        27       934        98
VIS    2025250    183200   18.1700  147.6100      12.1        28       934        98
VIS    2025250    183200   18.1600  147.5800      11.1        33       915        97
VIS    2025250    183200   18.1500  147.5500      10.6        33       889        98
VIS    2025250    183200   18.1700  147.5200      11.6        34       874        97
VIS    2025250    183200   18.1700  147.5100      11.7        34       869        96
VIS    2025250    183200   18.1500  147.4700      11.2        33       846        97
VIS    2025250    183200   18.1500  147.4500       9.7        31       842        95
VIS    2025250    183200   18.1600  147.4200      10.2        33       844        95
VIS    2025250    183200   18.1700  147.4100      10.0        38       876        92
VIS    2025250    183200   18.1500  147.3800      10.2        40       844        90
VIS    2025250    183200   18.1400  147.3400      10.5        34       807        96
VIS    2025250    183200   18.1600  147.3200      11.1        37       807        98
VIS    2025250    183200   18.1600  147.3100      11.0        36       807        98
VIS    2025250    183200   18.1500  147.2700       9.4        50       742        99
VIS    2025250    183200   18.1600  147.2600       9.0        59       729        93
VIS    2025250    183200   18.1400  145.5000      12.7        55       172        90
VIS    2025250    183200   18.1300  145.3600      11.6        75       154        90
VIS    2025250    183200   18.1400  145.3600      11.7        77       153        91
VIS    2025250    183200   18.1300  145.0500      12.9       100       170        95
VIS    2025250    183200   18.1200  145.0200      15.9       103       170        90
VIS    2025250    183200   18.1200  144.9800      16.5       114       173        92
VIS    2025250    183200   18.1200  144.9700      16.4       117       176        92
VIS    2025250    183200   18.1300  144.9400      15.3       122       173        91
VIS    2025250    183200   18.1300  144.7100      15.2       167       177        93
VIS    2025250    183200   18.1200  144.6100      16.2       171       175        94
VIS    2025250    183200   18.1200  144.6000      16.6       173       175        95
VIS    2025250    183200   18.1200  144.5700      16.4       178       180        93
VIS    2025250    183200   18.1300  144.5500      16.2       179       183        93
VIS    2025250    183200   18.1400  144.5200      16.9       181       182        92
VIS    2025250    183200   18.1400  144.4900      16.6       185       182        92
VIS    2025250    183200   18.1300  144.4600      14.8       180       182        90
VIS    2025250    183200   18.1200  144.3700      25.7       178       182        93
VIS    2025250    183200   18.1200  144.3600      26.1       178       182        93
VIS    2025250    183200   18.1200  144.2400      11.3       191       170        94
VIS    2025250    183200   18.1300  144.0600      14.2       170       182        98
VIS    2025250    183200   18.1200  144.0400      14.8       173       184        97
VIS    2025250    183200   18.1200  144.0200      15.4       176       184       100
VIS    2025250    183200   18.1300  143.9800      18.9       171       189        96
VIS    2025250    183200   18.1200  143.9700      20.0       172       189        94
VIS    2025250    183200   18.1300  143.9400      20.5       173       191        92
VIS    2025250    183200   18.1200  143.8700      15.5       173       191        98
VIS    2025250    183200   18.1200  143.8400      15.8       171       190        95
VIS    2025250    183200   18.1300  143.8200      16.4       166       190        98
VIS    2025250    183200   18.1300  143.8000      18.0       168       192        97
VIS    2025250    183200   18.1800  151.8600       7.2        72       986        90
VIS    2025250    183200   18.1500  148.7300       9.6        32       979        97
VIS    2025250    183200   18.1300  148.6800       9.2        41       939        92
VIS    2025250    183200   18.1300  148.6600       8.9        42       926        90
VIS    2025250    183200   18.1500  148.5900       8.5        31       934        97
VIS    2025250    183200   18.1300  148.5800       8.6        35       923        96
VIS    2025250    183200   18.1500  148.5100       9.1        26       962        97
VIS    2025250    183200   18.1500  148.5100       9.4        24       969        98
VIS    2025250    183200   18.1400  148.4700      10.0        34       951        95
VIS    2025250    183200   18.1500  148.4100       9.9        36       888        96
VIS    2025250    183200   18.1500  148.4000      10.0        36       884        96
VIS    2025250    183200   18.1400  148.3800       9.8        41       880        94
VIS    2025250    183200   18.1500  148.3500      10.5        40       873        91
VIS    2025250    183200   18.1300  148.3300      10.5        39       873        94
VIS    2025250    183200   18.1300  148.2900      10.5        35       875        93
VIS    2025250    183200   18.1300  148.2600      10.5        35       889        90
VIS    2025250    183200   18.1300  148.2100       9.6        32       956        92
VIS    2025250    183200   18.1300  148.1800       9.2        35       970        95
VIS    2025250    183200   18.1300  148.1600       9.4        38       984        94
VIS    2025250    183200   18.1300  148.1400      10.2        35       990        91
VIS    2025250    183200   18.1500  148.0000      10.6        30       949        96
VIS    2025250    183200   18.1400  147.9800      10.6        29       975        97
VIS    2025250    183200   18.1400  147.9600      10.9        28       975        96
VIS    2025250    183200   18.1500  147.8500      10.2        29       981        91
VIS    2025250    183200   18.1500  147.8300      10.3        29       991        93
VIS    2025250    183200   18.1400  147.8100      10.3        30       979        95
VIS    2025250    183200   18.1400  147.7800      10.1        34       947        95
VIS    2025250    183200   18.1200  147.7700       9.8        34       903        97
VIS    2025250    183200   18.1400  147.7200      10.8        32       942        94
VIS    2025250    183200   18.1400  147.7200      10.6        32       947        95
VIS    2025250    183200   18.1400  147.6900      10.5        30       961        94
VIS    2025250    183200   18.1200  147.6300      10.8        26       961        90
VIS    2025250    183200   18.1300  147.6000      11.5        28       944        98
VIS    2025250    183200   18.1300  147.5900      11.6        28       941        98
VIS    2025250    183200   18.1200  147.5700      11.1        29       919        97
VIS    2025250    183200   18.1200  147.5300      10.1        32       874        96
VIS    2025250    183200   18.1400  147.5100      11.7        33       867        97
VIS    2025250    183200   18.1400  147.4800      11.6        32       846        97
VIS    2025250    183200   18.1300  147.4500      10.0        26       844        93
VIS    2025250    183200   18.1300  147.4500       9.9        23       842        90
VIS    2025250    183200   18.1300  147.4000      10.0        35       844        97
VIS    2025250    183200   18.1200  147.3800       9.9        43       833        92
VIS    2025250    183200   18.1400  147.3400      10.4        34       807        95
VIS    2025250    183200   18.1300  147.3100      10.8        34       837        99
VIS    2025250    183200   18.1300  147.3000      10.5        34       834        97
VIS    2025250    183200   18.1400  147.2600       9.4        49       742        98
VIS    2025250    183200   18.1000  145.5600      11.9        53       169        91
VIS    2025250    183200   18.1000  145.3400      12.1        74       156        91
VIS    2025250    183200   18.1100  145.2800      10.3        44       155        92
VIS    2025250    183200   18.1000  145.2600       9.5        53       152        91
VIS    2025250    183200   18.1000  145.1100      10.3        99       175        92
VIS    2025250    183200   18.1200  145.1000       9.9       104       173        90
VIS    2025250    183200   18.1000  145.0700      11.2       113       183        92
VIS    2025250    183200   18.1100  145.0500      12.8       103       181        96
VIS    2025250    183200   18.1100  145.0100      16.0       104       175        92
VIS    2025250    183200   18.1100  144.9900      16.0       111       175        93
VIS    2025250    183200   18.1200  144.9700      16.3       116       173        93
VIS    2025250    183200   18.1000  144.9500      15.0       121       173        92
VIS    2025250    183200   18.1100  144.6900      16.4       172       185        91
VIS    2025250    183200   18.1100  144.6600      17.1       163       181        92
VIS    2025250    183200   18.1100  144.6400      17.5       163       178        96
VIS    2025250    183200   18.1200  144.6100      16.2       172       175        94
VIS    2025250    183200   18.1100  144.5700      16.5       179       177        93
VIS    2025250    183200   18.1100  144.5600      16.3       181       182        93
VIS    2025250    183200   18.1100  144.5300      16.2       180       183        91
VIS    2025250    183200   18.1100  144.5200      16.4       180       183        91
VIS    2025250    183200   18.1000  144.4900      18.5       185       182        93
VIS    2025250    183200   18.1100  144.3600      26.6       178       182        92
VIS    2025250    183200   18.1000  144.3500      26.6       179       182        93
VIS    2025250    183200   18.0900  144.3000      18.2       181       167        92
VIS    2025250    183200   18.1000  144.1600      12.2       202       173        93
VIS    2025250    183200   18.1000  144.1200      11.3       203       172        90
VIS    2025250    183200   18.0900  144.0400      16.5       173       185        90
VIS    2025250    183200   18.1000  144.0300      16.0       176       184        99
VIS    2025250    183200   18.1100  143.9600      20.4       174       190        92
VIS    2025250    183200   18.1100  143.9400      19.2       177       194        92
VIS    2025250    183200   18.1100  143.8600      15.9       174       191        96
VIS    2025250    183200   18.1000  143.8300      16.7       176       191        93
VIS    2025250    183200   18.1100  143.8000      16.7       173       192        96
VIS    2025250    183200   18.1000  143.7900      16.7       175       194        95
VIS    2025250    183200   18.1300  148.6800       9.1        41       939        91
VIS    2025250    183200   18.1200  148.6100       8.8        34       903        94
VIS    2025250    183200   18.1300  148.6100       8.9        32       907        98
VIS    2025250    183200   18.1300  148.5700       8.6        37       923        94
VIS    2025250    183200   18.1300  148.5000       9.7        26       969        98
VIS    2025250    183200   18.1100  148.4800       9.3        31       974        94
VIS    2025250    183200   18.1300  148.4100       9.2        41       888        92
VIS    2025250    183200   18.1100  148.3800       9.1        46       881        96
VIS    2025250    183200   18.1100  148.3500       9.3        44       877        98
VIS    2025250    183200   18.1200  148.3200      10.0        37       874        94
VIS    2025250    183200   18.1200  148.3100      10.2        36       874        94
VIS    2025250    183200   18.1300  148.2800       9.9        37       877        94
VIS    2025250    183200   18.1200  148.2600       9.5        40       880        97
VIS    2025250    183200   18.1100  148.2200       9.7        34       956        92
VIS    2025250    183200   18.1000  148.1900       9.1        33       956        91
VIS    2025250    183200   18.1000  148.1900       9.0        33       960        92
VIS    2025250    183200   18.1100  148.1400       9.9        35       990        92
VIS    2025250    183200   18.1000  148.0900      11.1        38       990        93
VIS    2025250    183200   18.1000  147.8100      10.4        25       976        97
VIS    2025250    183200   18.1200  147.7800       9.4        33       918        97
VIS    2025250    183200   18.1200  147.7700       9.6        34       903        97
VIS    2025250    183200   18.1000  147.7200      11.2        38       924        96
VIS    2025250    183200   18.1000  147.7100      11.2        34       941        94
VIS    2025250    183200   18.1200  147.6300      10.9        25       960        91
VIS    2025250    183200   18.1200  147.6100      11.5        26       944        97
VIS    2025250    183200   18.1000  147.6000      11.6        25       936        97
VIS    2025250    183200   18.1200  147.5700      11.5        28       922        97
VIS    2025250    183200   18.1200  147.5300      10.2        32       874        96
VIS    2025250    183200   18.1200  147.5200      10.3        32       869        95
VIS    2025250    183200   18.1000  147.4900      10.6        27       856        90
VIS    2025250    183200   18.1000  147.4100       9.9        30       833        94
VIS    2025250    183200   18.1100  147.3900       9.7        40       830        96
VIS    2025250    183200   18.1100  147.3100      11.3        38       837        99
VIS    2025250    183200   18.1100  147.2800      10.6        38       837        99
VIS    2025250    183200   18.1100  147.2600      10.0        40       811        98
VIS    2025250    183200   18.1000  147.2500      10.4        38       811        98
VIS    2025250    183200   18.0900  147.2200      10.1        45       706        95
VIS    2025250    183200   18.0900  145.6000      12.6        51       175        90
VIS    2025250    183200   18.1000  145.5800      12.2        55       168        92
VIS    2025250    183200   18.0900  145.5500      12.0        54       171        90
VIS    2025250    183200   18.0800  145.5400      12.0        55       171        91
VIS    2025250    183200   18.0800  145.3600      10.1        73       162        92
VIS    2025250    183200   18.0800  145.3400      10.8        71       160        93
VIS    2025250    183200   18.0900  145.2800       9.4        49       155        94
VIS    2025250    183200   18.0800  145.1100      11.4        97       176        92
VIS    2025250    183200   18.0900  145.0800      12.3       115       183        92
VIS    2025250    183200   18.0900  145.0100      15.3       102       177        92
VIS    2025250    183200   18.0800  144.9900      15.6       114       175        92
VIS    2025250    183200   18.0800  144.9800      15.5       118       175        92
VIS    2025250    183200   18.0800  144.9400      14.0       123       175        90
VIS    2025250    183200   18.0800  144.6500      19.0       167       186        98
VIS    2025250    183200   18.0800  144.6400      18.9       165       185        97
VIS    2025250    183200   18.0900  144.6000      17.0       176       173        95
VIS    2025250    183200   18.0900  144.5800      17.1       182       177        92
VIS    2025250    183200   18.0900  144.5700      17.2       184       180        92
VIS    2025250    183200   18.0800  144.5500      17.0       185       184        92
VIS    2025250    183200   18.0900  144.5200      16.2       181       183        90
VIS    2025250    183200   18.0900  144.3600      27.1       179       183        91
VIS    2025250    183200   18.0900  144.3500      27.1       179       183        93
VIS    2025250    183200   18.0700  144.3100      22.0       179       176        95
VIS    2025250    183200   18.0700  144.3100      19.8       180       176        95
VIS    2025250    183200   18.0700  144.2300      14.0       202       171        90
VIS    2025250    183200   18.0700  144.0200      16.7       177       184        92
VIS    2025250    183200   18.0700  144.0100      17.0       178       185        95
VIS    2025250    183200   18.0800  143.9900      20.4       178       187        93
VIS    2025250    183200   18.0700  143.8300      17.8       179       193        91
VIS    2025250    183200   18.0700  143.8200      17.8       179       193        91
VIS    2025250    183200   18.1100  148.7300       9.5        31       991        94
VIS    2025250    183200   18.1000  148.7100       9.3        35       971        90
VIS    2025250    183200   18.0800  148.6300       8.6        44       905        95
VIS    2025250    183200   18.1000  148.5900       9.1        38       898        92
VIS    2025250    183200   18.0900  148.5600       9.0        40       908        95
VIS    2025250    183200   18.1000  148.4900       9.3        32       974        95
VIS    2025250    183200   18.1000  148.4800       9.2        33       974        94
VIS    2025250    183200   18.0800  148.4400       8.9        36       959        93
VIS    2025250    183200   18.0900  148.4200       8.6        44       937        92
VIS    2025250    183200   18.0800  148.4100       8.8        45       935        91
VIS    2025250    183200   18.0900  148.3600       9.0        46       882        96
VIS    2025250    183200   18.0800  148.3600       8.9        45       880        97
VIS    2025250    183200   18.0800  148.3200       9.0        42       878        94
VIS    2025250    183200   18.1000  148.3000       9.0        40       873        91
VIS    2025250    183200   18.0900  148.2700       8.4        44       873        96
VIS    2025250    183200   18.0900  148.2500       9.1        42       880        99
VIS    2025250    183200   18.0900  148.2200       9.4        37       931        94
VIS    2025250    183200   18.1000  148.1900       9.0        34       956        91
VIS    2025250    183200   18.0900  148.1800       9.1        28       970        95
VIS    2025250    183200   18.0800  148.1400       9.7        28       987        94
VIS    2025250    183200   18.1000  148.1000      10.8        38       981        93
VIS    2025250    183200   18.0800  148.0800      12.1        16       979        99
VIS    2025250    183200   18.0800  148.0600      10.1        30       996        97
VIS    2025250    183200   18.0800  147.8000      10.4        17       954        95
VIS    2025250    183200   18.1000  147.7900      10.2        23       972        97
VIS    2025250    183200   18.0900  147.7500      10.0        33       917        99
VIS    2025250    183200   18.0900  147.7400      10.7        37       917        97
VIS    2025250    183200   18.0900  147.7100      11.2        37       941        96
VIS    2025250    183200   18.0700  147.6900      10.6        36       951        90
VIS    2025250    183200   18.0800  147.6500      11.3        25       951        90
VIS    2025250    183200   18.0800  147.6500      11.3        24       951        91
VIS    2025250    183200   18.0800  147.6100      11.7        24       951        94
VIS    2025250    183200   18.0700  147.5900      11.5        25       931        97
VIS    2025250    183200   18.0800  147.5600      10.7        27       924        96
VIS    2025250    183200   18.0800  147.5500      10.8        28       917        96
VIS    2025250    183200   18.0800  147.5000      11.3        23       857        92
VIS    2025250    183200   18.0700  147.4800      10.7        24       852        92
VIS    2025250    183200   18.0800  147.4600      10.5        32       844        94
VIS    2025250    183200   18.0900  147.4300      10.3        32       838        93
VIS    2025250    183200   18.0800  147.4100      10.4        32       830        96
VIS    2025250    183200   18.0800  147.3800      10.4        39       817        99
VIS    2025250    183200   18.0900  147.3200      12.1        41       837        99
VIS    2025250    183200   18.0700  147.3000      11.8        37       846        99
VIS    2025250    183200   18.0700  147.2700      10.9        32       841        99
VIS    2025250    183200   18.0800  147.2500      10.9        32       833        98
VIS    2025250    183200   18.0700  147.2200      10.5        40       706        93
VIS    2025250    183200   18.0600  145.5800      12.0        51       182        91
VIS    2025250    183200   18.0700  145.5500      12.1        54       171        91
VIS    2025250    183200   18.0500  145.5200      11.0        55       174        94
VIS    2025250    183200   18.0500  145.5000      10.1        50       176        97
VIS    2025250    183200   18.0500  145.4800      11.8        44       178        92
VIS    2025250    183200   18.0600  145.3500      10.4        67       162        95
VIS    2025250    183200   18.0700  145.3400      11.3        65       161        94
VIS    2025250    183200   18.0600  145.3100      12.3        56       161        92
VIS    2025250    183200   18.0500  145.1200      10.9        90       168        90
VIS    2025250    183200   18.0700  144.9800      15.2       121       175        91
VIS    2025250    183200   18.0500  144.6200      19.0       178       187        93
VIS    2025250    183200   18.0500  144.6200      19.0       180       187        93
VIS    2025250    183200   18.0600  144.5800      18.9       189       184        91
VIS    2025250    183200   18.0700  144.5600      18.9       188       184        92
VIS    2025250    183200   18.0600  144.5300      17.3       184       184        92
VIS    2025250    183200   18.0700  144.3100      22.2       179       176        94
VIS    2025250    183200   18.0500  144.0000      18.0       178       185        95
VIS    2025250    183200   18.0600  143.9800      20.9       179       187        92
VIS    2025250    183200   18.0600  143.8200      18.8       180       194        90
VIS    2025250    183200   18.0600  143.7900      17.5       179       193        93
VIS    2025250    183200   18.0700  148.7300       9.8        37       977        92
VIS    2025250    183200   18.0700  148.7100       9.7        39       977        91
VIS    2025250    183200   18.0600  148.6700       8.9        44       962        90
VIS    2025250    183200   18.0700  148.6100       8.5        41       901        97
VIS    2025250    183200   18.0800  148.5800       8.9        39       903        94
VIS    2025250    183200   18.0800  148.4400       9.1        36       959        94
VIS    2025250    183200   18.0700  148.4200       8.9        40       956        93
VIS    2025250    183200   18.0800  148.4000       8.9        44       904        95
VIS    2025250    183200   18.0600  148.3700       8.9        44       886        98
VIS    2025250    183200   18.0700  148.3400       9.1        44       880        96
VIS    2025250    183200   18.0600  148.3200       9.3        43       883        93
VIS    2025250    183200   18.0600  148.2600       9.0        41       880        91
VIS    2025250    183200   18.0600  148.2300       9.4        39       867        98
VIS    2025250    183200   18.0600  148.2100       9.5        36       927        96
VIS    2025250    183200   18.0700  148.2000       9.1        37       933        93
VIS    2025250    183200   18.0600  148.1500       9.1        25       975        97
VIS    2025250    183200   18.0700  148.1300       9.8        24       992        99
VIS    2025250    183200   18.0700  148.0800      11.9        16       979        99
VIS    2025250    183200   18.0700  148.0800      11.6        17       979        98
VIS    2025250    183200   18.0700  147.7600       9.8        27       917        95
VIS    2025250    183200   18.0700  147.7500      10.0        31       917        95
VIS    2025250    183200   18.0700  147.6900      10.7        37       969        90
VIS    2025250    183200   18.0500  147.6600      11.5        34       951        94
VIS    2025250    183200   18.0500  147.6500      11.8        31       951        94
VIS    2025250    183200   18.0600  147.6200      12.0        23       960        98
VIS    2025250    183200   18.0600  147.6000      11.6        23       951        98
VIS    2025250    183200   18.0600  147.5700      11.0        23       933        97
VIS    2025250    183200   18.0600  147.5500      11.0        26       931        97
VIS    2025250    183200   18.0600  147.5300      11.2        25       903        96
VIS    2025250    183200   18.0500  147.4900      11.4        27       856        96
VIS    2025250    183200   18.0600  147.4800      11.1        29       853        96
VIS    2025250    183200   18.0600  147.4400      10.9        38       840        99
VIS    2025250    183200   18.0500  147.4200      10.7        37       833        93
VIS    2025250    183200   18.0700  147.4000      10.6        33       830        98
VIS    2025250    183200   18.0600  147.3700      11.5        37       744        93
VIS    2025250    183200   18.0500  147.3300      12.1        32       782        94
VIS    2025250    183200   18.0500  147.2900      11.5        31       864        99
VIS    2025250    183200   18.0500  147.2900      11.5        32       850        99
VIS    2025250    183200   18.0600  147.2500      11.2        30       841        98
VIS    2025250    183200   18.0500  147.2400      11.0        33       787        95
VIS    2025250    183200   18.0300  145.5900      12.2        48       183        90
VIS    2025250    183200   18.0300  145.5600      12.2        50       182        91
VIS    2025250    183200   18.0500  145.5400      11.9        55       174        92
VIS    2025250    183200   18.0300  145.5200      11.5        46       176        92
VIS    2025250    183200   18.0500  145.5000      10.1        47       176        97
VIS    2025250    183200   18.0300  145.4800      10.8        40       180        94
VIS    2025250    183200   18.0300  145.4500      11.2        44       181        94
VIS    2025250    183200   18.0300  145.4200      10.1        49       179        97
VIS    2025250    183200   18.0300  145.4100       9.1        50       177        98
VIS    2025250    183200   18.0300  145.3700       9.6        56       166        94
VIS    2025250    183200   18.0300  145.3600      10.1        55       166        94
VIS    2025250    183200   18.0300  145.2500       8.4        67       160        93
VIS    2025250    183200   18.0300  145.1200      13.8        87       164        95
VIS    2025250    183200   18.0400  145.0900      15.8        97       180       100
VIS    2025250    183200   18.0400  144.6200      18.9       180       187        92
VIS    2025250    183200   18.0400  144.6000      18.6       185       185        91
VIS    2025250    183200   18.0200  144.5500      17.7       187       186        91
VIS    2025250    183200   18.0400  144.5400      17.8       187       185        91
VIS    2025250    183200   18.0200  144.0200      17.7       177       185        97
VIS    2025250    183200   18.0400  143.9900      19.2       179       185        95
VIS    2025250    183200   18.0400  143.7800      17.9       181       193        92
VIS    2025250    183200   18.0600  148.7200       9.9        39       977        92
VIS    2025250    183200   18.0500  148.7000       9.6        40       965        91
VIS    2025250    183200   18.0500  148.6900       9.4        41       965        91
VIS    2025250    183200   18.0400  148.6700       8.9        41       933        92
VIS    2025250    183200   18.0500  148.6300       8.4        38       939        94
VIS    2025250    183200   18.0400  148.6000       8.9        36       924        96
VIS    2025250    183200   18.0400  148.5700       9.7        33       945        91
VIS    2025250    183200   18.0400  148.5700       9.7        33       942        91
VIS    2025250    183200   18.0500  148.4500       9.6        29       959        93
VIS    2025250    183200   18.0300  148.3900       9.6        41       915        92
VIS    2025250    183200   18.0300  148.3700       9.5        38       895        97
VIS    2025250    183200   18.0400  148.3300       9.6        42       886        93
VIS    2025250    183200   18.0500  148.3200       9.4        43       885        92
VIS    2025250    183200   18.0400  148.2900       9.5        41       885        94
VIS    2025250    183200   18.0400  148.2600       9.4        39       882        94
VIS    2025250    183200   18.0300  148.2300      10.4        33       867        97
VIS    2025250    183200   18.0400  148.2000      10.1        30       933        97
VIS    2025250    183200   18.0500  148.1900       9.4        32       942        96
VIS    2025250    183200   18.0300  148.1500       9.4        28       969        94
VIS    2025250    183200   18.0300  148.1400       9.3        27       969        95
VIS    2025250    183200   18.0400  148.0800      11.1        19       982        97
VIS    2025250    183200   18.0300  147.8300      10.6        23       995        91
VIS    2025250    183200   18.0500  147.7800       9.6        19       920        91
VIS    2025250    183200   18.0300  147.7700       8.9        34       907        90
VIS    2025250    183200   18.0400  147.7300      10.4        40       874        94
VIS    2025250    183200   18.0400  147.7200      10.9        36       955        93
VIS    2025250    183200   18.0300  147.6900      10.7        25       970        95
VIS    2025250    183200   18.0300  147.6800      10.6        25       976        95
VIS    2025250    183200   18.0300  147.6400      12.0        23       952        97
VIS    2025250    183200   18.0400  147.6200      12.4        22       964        96
VIS    2025250    183200   18.0400  147.5800      11.2        24       952        90
VIS    2025250    183200   18.0300  147.5400      11.4        26       939        96
VIS    2025250    183200   18.0300  147.5300      11.4        26       939        97
VIS    2025250    183200   18.0200  147.4900      10.9        33       867        98
VIS    2025250    183200   18.0300  147.4700      11.1        36       857        99
VIS    2025250    183200   18.0200  147.4500      11.5        37       856        99
VIS    2025250    183200   18.0300  147.4400      11.3        38       837        97
VIS    2025250    183200   18.0400  147.3900      10.8        38       827        94
VIS    2025250    183200   18.0400  147.3800      11.3        37       817        96
VIS    2025250    183200   18.0400  147.3300      11.9        30       807        95
VIS    2025250    183200   18.0400  147.2900      11.5        31       864        99
VIS    2025250    183200   18.0400  147.2900      11.6        30       864        98
VIS    2025250    183200   18.0400  147.2500      11.6        32       833        97
VIS    2025250    183200   18.0400  147.2200      10.8        35       752        92
VIS    2025250    183200   18.0300  145.5800      11.9        49       182        92
VIS    2025250    183200   18.0300  145.5000      10.2        40       177        94
VIS    2025250    183200   18.0200  145.4800      10.6        39       180        93
VIS    2025250    183200   18.0100  145.4400       9.8        48       181        96
VIS    2025250    183200   18.0200  145.4100      10.1        46       179        97
VIS    2025250    183200   18.0200  145.4000       9.5        47       177        99
VIS    2025250    183200   18.0100  145.3800      10.6        48       172        96
VIS    2025250    183200   18.0000  144.6200      16.5       183       183        91
VIS    2025250    183200   18.0200  144.5500      17.4       189       186        90
VIS    2025250    183200   18.0200  144.4000      13.8       180       183        90
VIS    2025250    183200   18.0000  144.3700      18.2       186       185        91
VIS    2025250    183200   18.0000  144.3600      18.7       186       186        91
VIS    2025250    183200   18.0100  144.3200      21.8       185       185        91
VIS    2025250    183200   18.0200  144.2700      18.8       186       177        92
VIS    2025250    183200   18.0000  144.2600      18.2       181       181        94
VIS    2025250    183200   18.0100  144.0100      17.8       177       185        96
VIS    2025250    183200   17.9900  143.9900      19.0       177       191        91
VIS    2025250    183200   18.0200  148.6600       8.8        39       916        90
VIS    2025250    183200   18.0200  148.6400       8.9        39       919        94
VIS    2025250    183200   18.0100  148.6300       9.1        37       901        97
VIS    2025250    183200   18.0200  148.6000       9.3        35       933        91
VIS    2025250    183200   18.0100  148.4300       9.6        45       951        91
VIS    2025250    183200   18.0100  148.3800       9.3        43       915        91
VIS    2025250    183200   18.0100  148.3600       9.2        36       895        98
VIS    2025250    183200   18.0100  148.3200      10.1        37       886        95
VIS    2025250    183200   18.0200  148.3000      10.1        41       886        94
VIS    2025250    183200   18.0100  148.2700      10.1        40       885        96
VIS    2025250    183200   18.0100  148.2600      10.3        38       885        96
VIS    2025250    183200   18.0100  148.2400      10.8        36       868        97
VIS    2025250    183200   18.0100  148.2000      10.2        30       959        96
VIS    2025250    183200   18.0300  148.1700       9.8        28       969        95
VIS    2025250    183200   18.0200  148.0700      11.6        23       982        91
VIS    2025250    183200   18.0000  148.0200      10.9        17       967        96
VIS    2025250    183200   18.0000  147.9700       9.6        36       986        90
VIS    2025250    183200   18.0000  147.9500       9.3        31       990        93
VIS    2025250    183200   18.0000  147.8300      10.1        35       997        95
VIS    2025250    183200   18.0000  147.8100       9.2        32       993        94
VIS    2025250    183200   18.0000  147.7900       8.9        35       992        94
VIS    2025250    183200   18.0200  147.7700       8.8        34       907        94
VIS    2025250    183200   18.0100  147.7300      10.8        38       891        96
VIS    2025250    183200   18.0100  147.7000      10.7        27       955        96
VIS    2025250    183200   18.0200  147.6800      10.4        22       976        95
VIS    2025250    183200   18.0100  147.6500      11.6        22       964        93
VIS    2025250    183200   18.0100  147.6500      11.7        22       964        92
VIS    2025250    183200   18.0000  147.6100      11.0        25       952        96
VIS    2025250    183200   18.0000  147.5800      11.3        25       940        95
VIS    2025250    183200   18.0200  147.5800      11.7        26       947        93
VIS    2025250    183200   18.0200  147.5300      11.3        27       939        96
VIS    2025250    183200   18.0200  147.5100      10.5        31       889        97
VIS    2025250    183200   18.0100  147.4900      10.3        36       867        98
VIS    2025250    183200   18.0000  147.4800      10.2        35       867        98
VIS    2025250    183200   18.0000  147.4500      11.5        36       853       100
VIS    2025250    183200   18.0000  147.4100      11.0        38       836        99
VIS    2025250    183200   18.0200  147.3800      11.1        31       819        90
VIS    2025250    183200   18.0200  147.3200      12.0        26       822        90
VIS    2025250    183200   18.0200  147.2900      11.4        31       878        94
VIS    2025250    183200   18.0000  147.2600      11.6        28       782        90
VIS    2025250    183200   18.0000  147.2500      11.5        27       761        91
VIS    2025250    183200   18.0100  147.2200      10.2        41       702        91
VIS    2025250    183200   17.9900  145.5200      12.3        39       179        90
VIS    2025250    183200   18.0000  145.4100      10.6        44       181        94
VIS    2025250    183200   17.9800  145.3900      11.1        43       178        94
VIS    2025250    183200   17.9800  145.3700      10.8        49       177        94
VIS    2025250    183200   17.9900  144.6300      15.9       181       186        92
VIS    2025250    183200   17.9900  144.6200      16.1       183       184        91
VIS    2025250    183200   17.9700  144.6000      17.1       190       185        90
VIS    2025250    183200   17.9900  144.4000      15.8       182       184        92
VIS    2025250    183200   17.9900  144.3600      18.5       187       186        91
VIS    2025250    183200   17.9900  144.2700      19.0       180       181        95
VIS    2025250    183200   17.9800  144.2600      18.4       178       181        95
VIS    2025250    183200   17.9900  144.2400      17.0       176       181        90
VIS    2025250    183200   17.9900  144.0100      17.0       176       185        98
VIS    2025250    183200   17.9800  143.9800      18.3       177       191        94
VIS    2025250    183200   17.9900  148.6600       8.7        39       905        96
VIS    2025250    183200   18.0100  148.6300       9.2        36       901        98
VIS    2025250    183200   18.0000  148.6200       9.4        34       901        98
VIS    2025250    183200   18.0000  148.5800       9.3        35       945        90
VIS    2025250    183200   17.9900  148.5700       9.1        34       933        94
VIS    2025250    183200   17.9900  148.3700       8.9        39       935        91
VIS    2025250    183200   17.9900  148.3700       8.8        37       915        94
VIS    2025250    183200   17.9800  148.3400       9.0        37       888        99
VIS    2025250    183200   17.9900  148.3100      10.0        38       886        94
VIS    2025250    183200   17.9800  148.2900      10.2        39       886        95
VIS    2025250    183200   17.9900  148.2500      10.5        39       885        95
VIS    2025250    183200   18.0000  148.2400      10.7        37       868        97
VIS    2025250    183200   18.0000  148.2100      10.2        30       947        96
VIS    2025250    183200   18.0000  148.1900      10.1        29       959        96
VIS    2025250    183200   17.9900  148.0600       9.8        25       988        97
VIS    2025250    183200   17.9800  148.0300      10.1        17       977        98
VIS    2025250    183200   18.0000  148.0100      10.7        20       966        96
VIS    2025250    183200   17.9800  148.0000      10.5        27       966        94
VIS    2025250    183200   17.9900  147.9600       9.7        35       982        92
VIS    2025250    183200   17.9800  147.9300       9.6        27       983        95
VIS    2025250    183200   17.9800  147.9100       9.9        21       988        95
VIS    2025250    183200   17.9800  147.8900      10.2        16       991        94
VIS    2025250    183200   17.9800  147.8500      12.1        22       985        96
VIS    2025250    183200   17.9800  147.8300      12.0        21       988        97
VIS    2025250    183200   17.9800  147.8100      11.0        19       986        98
VIS    2025250    183200   18.0000  147.7900       8.9        36       978        94
VIS    2025250    183200   17.9800  147.7700       9.7        32       967        96
VIS    2025250    183200   17.9900  147.7400      10.8        39       899        95
VIS    2025250    183200   17.9900  147.7100      11.3        28       931        96
VIS    2025250    183200   17.9900  147.6800      10.6        23       970        95
VIS    2025250    183200   17.9900  147.6600      10.9        27       964        91
VIS    2025250    183200   18.0000  147.6400      11.6        25       958        96
VIS    2025250    183200   18.0000  147.6100      11.0        26       947        97
VIS    2025250    183200   17.9800  147.6000      11.6        25       947        99
VIS    2025250    183200   17.9900  147.5400      10.8        28       947        91
VIS    2025250    183200   17.9900  147.4400      11.5        35       844       100
VIS    2025250    183200   17.9800  147.4200      10.6        37       840        99
VIS    2025250    183200   17.9900  147.4000      10.6        35       834        94
VIS    2025250    183200   17.9700  147.3500      11.5        33       822        95
VIS    2025250    183200   17.9900  147.3300      11.4        30       828        94
VIS    2025250    183200   17.9900  147.3000      10.6        30       868        92
VIS    2025250    183200   17.9900  147.2800      10.8        26       812        90
VIS    2025250    183200   17.9700  147.2300      10.3        31       761        92
VIS    2025250    183200   17.9800  147.2100      10.1        45       702        92
VIS    2025250    183200   17.9600  145.5300      11.9        40       182        91
VIS    2025250    183200   17.9600  145.5300      11.8        39       182        90
VIS    2025250    183200   17.9600  145.5000      10.4        36       180        91
VIS    2025250    183200   17.9600  145.4700      10.0        43       180        92
VIS    2025250    183200   17.9700  145.3900      11.0        45       178        95
VIS    2025250    183200   17.9700  145.3700      10.7        52       177        94
VIS    2025250    183200   17.9600  145.3400       8.2        48       175        98
VIS    2025250    183200   17.9500  145.3300       7.5        50       175        91
VIS    2025250    183200   17.9700  144.6100      17.0       187       186        91
VIS    2025250    183200   17.9600  144.5900      18.1       192       185        90
VIS    2025250    183200   17.9600  144.3400      18.0       194       188        90
VIS    2025250    183200   17.9600  143.9900      18.2       176       189        92
VIS    2025250    183200   17.9500  143.9700      19.3       176       191        93
VIS    2025250    183200   17.9700  148.7000       8.5        46       990        90
VIS    2025250    183200   17.9800  148.6500       8.7        39       917        94
VIS    2025250    183200   17.9700  148.6400       8.8        38       900        96
VIS    2025250    183200   17.9600  148.6200       9.0        31       896       100
VIS    2025250    183200   17.9800  148.5900       9.2        32       898        96
VIS    2025250    183200   17.9800  148.5600       9.1        31       933        97
VIS    2025250    183200   17.9600  148.5400       9.0        30       933        92
VIS    2025250    183200   17.9600  148.3700       9.5        37       962        93
VIS    2025250    183200   17.9800  148.3500       8.7        35       910        97
VIS    2025250    183200   17.9700  148.3300       9.1        31       888        96
VIS    2025250    183200   17.9700  148.3200       9.4        29       887        93
VIS    2025250    183200   17.9800  148.2900      10.2        37       886        96
VIS    2025250    183200   17.9700  148.2500      10.4        39       884        95
VIS    2025250    183200   17.9600  148.2400      10.2        38       884        96
VIS    2025250    183200   17.9700  148.2000       9.5        27       882        99
VIS    2025250    183200   17.9600  148.1900       9.5        22       947        98
VIS    2025250    183200   17.9600  148.1400      10.2        20       988        91
VIS    2025250    183200   17.9700  148.0500       9.5        26       994        98
VIS    2025250    183200   17.9700  148.0400       9.2        23       991        98
VIS    2025250    183200   17.9600  148.0100       9.2        26       966        95
VIS    2025250    183200   17.9500  147.9600      10.2        31       972        97
VIS    2025250    183200   17.9700  147.9300       9.9        25       984        96
VIS    2025250    183200   17.9600  147.9200       9.9        22       986        96
VIS    2025250    183200   17.9600  147.8900      10.2        17       986        96
VIS    2025250    183200   17.9600  147.8700      10.9        23       979        99
VIS    2025250    183200   17.9500  147.8300      12.2        17       977        99
VIS    2025250    183200   17.9700  147.8000      11.0        18       973        98
VIS    2025250    183200   17.9700  147.8000      10.6        21       973        98
VIS    2025250    183200   17.9700  147.7700       9.9        31       963        97
VIS    2025250    183200   17.9700  147.7300      10.9        36       899        98
VIS    2025250    183200   17.9500  147.7000      11.0        23       921        94
VIS    2025250    183200   17.9700  147.6900      11.6        24       954        96
VIS    2025250    183200   17.9600  147.6600      11.4        34       958        96
VIS    2025250    183200   17.9600  147.6500      11.4        34       959        96
VIS    2025250    183200   17.9700  147.6100      11.7        26       958        97
VIS    2025250    183200   17.9700  147.6000      11.8        24       947        98
VIS    2025250    183200   17.9700  147.5700      11.3        20       943        96
VIS    2025250    183200   17.9500  147.5300      10.8        23       953        96
VIS    2025250    183200   17.9500  147.5200      10.9        22       951        97
VIS    2025250    183200   17.9500  147.4800      10.9        16       904        94
VIS    2025250    183200   17.9500  147.4600      10.6        22       863        95
VIS    2025250    183200   17.9600  147.4500      10.9        29       853        98
VIS    2025250    183200   17.9500  147.4100      10.7        30       840        97
VIS    2025250    183200   17.9600  147.4100      10.4        33       834        94
VIS    2025250    183200   17.9600  147.3400      11.3        33       815        95
VIS    2025250    183200   17.9600  147.3200      10.4        35       825        95
VIS    2025250    183200   17.9500  147.3000      10.1        23       823        94
VIS    2025250    183200   17.9500  147.2800      10.4        19       823        92
VIS    2025250    183200   17.9700  147.2400      10.7        28       764        92
VIS    2025250    183200   17.9700  147.2300      10.2        34       761        94
VIS    2025250    183200   17.9500  147.1900       9.3        43       747        94
VIS    2025250    183200   17.9500  145.5300      11.7        40       182        90
VIS    2025250    183200   17.9500  145.5300      11.7        39       182        90
VIS    2025250    183200   17.9300  145.5000      10.3        36       180        91
VIS    2025250    183200   17.9300  145.3800       8.2        53       182        98
VIS    2025250    183200   17.9500  145.3700       9.3        57       178        97
VIS    2025250    183200   17.9500  145.3400       7.4        51       178        94
VIS    2025250    183200   17.9400  144.6700      17.2       179       187        92
VIS    2025250    183200   17.9300  144.6400      17.6       186       187        91
VIS    2025250    183200   17.9400  143.9800      18.8       175       188        95
VIS    2025250    183200   17.9300  143.9500      18.0       178       193        93
VIS    2025250    183200   17.9300  143.9500      17.7       180       193        92
VIS    2025250    183200   17.9600  150.2200       7.8        33       969        96
VIS    2025250    183200   17.9400  148.6000       8.9        32       900        98
VIS    2025250    183200   17.9500  148.5900       9.3        26       896        98
VIS    2025250    183200   17.9400  148.5600       9.3        26       895        97
VIS    2025250    183200   17.9600  148.5300       8.8        31       931        90
VIS    2025250    183200   17.9400  148.5100       8.7        35       933        94
VIS    2025250    183200   17.9400  148.4900       8.6        34       979        93
VIS    2025250    183200   17.9500  148.3700       9.6        36       972        93
VIS    2025250    183200   17.9400  148.3500       9.5        24       949        90
VIS    2025250    183200   17.9400  148.2900       9.1        35       885        98
VIS    2025250    183200   17.9500  148.2800       9.4        34       885        97
VIS    2025250    183200   17.9300  148.2500       9.6        36       884        97
VIS    2025250    183200   17.9500  148.2300       9.6        31       870        96
VIS    2025250    183200   17.9300  148.2000       9.2        22       947        95
VIS    2025250    183200   17.9500  148.1800       9.3        21       960        97
VIS    2025250    183200   17.9300  148.0800      10.3        31       987        96
VIS    2025250    183200   17.9300  148.0500       9.6        23       987        98
VIS    2025250    183200   17.9300  148.0400       8.9        21       987        97
VIS    2025250    183200   17.9500  148.0000       9.3        25       966        94
VIS    2025250    183200   17.9500  147.9800      10.5        24       966        96
VIS    2025250    183200   17.9500  147.9600      10.3        28       972        98
VIS    2025250    183200   17.9300  147.9200      10.5        20       983        98
VIS    2025250    183200   17.9300  147.9000      10.6        21       971        98
VIS    2025250    183200   17.9300  147.8900      10.6        22       968        98
VIS    2025250    183200   17.9300  147.8400      11.1        24       961        97
VIS    2025250    183200   17.9300  147.8400      11.3        20       964        99
VIS    2025250    183200   17.9300  147.8100      11.5        14       974        99
VIS    2025250    183200   17.9400  147.7900      11.4        16       970        99
VIS    2025250    183200   17.9300  147.7500      11.3        15       962        99
VIS    2025250    183200   17.9400  147.7400      10.8        20       947       100
VIS    2025250    183200   17.9400  147.7100      10.6        22       929        92
VIS    2025250    183200   17.9300  147.6600      12.0        26       956        95
VIS    2025250    183200   17.9300  147.6400      11.4        25       963        97
VIS    2025250    183200   17.9500  147.6000      12.4        25       959        96
VIS    2025250    183200   17.9400  147.5800      12.0        23       959        90
VIS    2025250    183200   17.9300  147.5500      10.7        26       962        90
VIS    2025250    183200   17.9500  147.5300      10.9        23       951        97
VIS    2025250    183200   17.9300  147.5200      10.4        24       948        96
VIS    2025250    183200   17.9300  147.4900      10.5        21       918        95
VIS    2025250    183200   17.9300  147.4500      10.6        24       864        93
VIS    2025250    183200   17.9400  147.4400      10.7        27       853        96
VIS    2025250    183200   17.9400  147.4100      10.9        28       829        95
VIS    2025250    183200   17.9200  147.3900      10.7        30       813        92
VIS    2025250    183200   17.9300  147.2800       9.2        35       823        93
VIS    2025250    183200   17.9200  147.2700       9.5        35       823        95
VIS    2025250    183200   17.9300  147.2400       9.8        31       818        96
VIS    2025250    183200   17.9200  147.2200      10.0        29       802        95
VIS    2025250    183200   17.9400  147.1900       9.3        42       747        94
VIS    2025250    183200   17.9400  147.1800       9.2        44       702        96
VIS    2025250    183200   17.9100  145.5300      10.2        39       186        96
VIS    2025250    183200   17.9200  145.5100       9.9        39       180        96
VIS    2025250    183200   17.9200  145.5000       9.9        37       180        94
VIS    2025250    183200   17.9300  145.4000       7.7        46       188        90
VIS    2025250    183200   17.9300  145.3500       7.8        55       181        93
VIS    2025250    183200   17.9300  145.3400       7.6        48       180        94
VIS    2025250    183200   17.9100  144.7000      17.3       183       185        93
VIS    2025250    183200   17.9200  144.6900      17.4       182       184        93
VIS    2025250    183200   17.9000  144.1200      17.3       175       184        91
VIS    2025250    183200   17.9200  143.9700      18.8       174       188        93
VIS    2025250    183200   17.9100  143.9500      17.4       179       193        92
VIS    2025250    183200   17.9500  150.3200       8.8        35       997        90
VIS    2025250    183200   17.9300  148.6300       9.6        40       971        90
VIS    2025250    183200   17.9300  148.6200       9.5        40       920        91
VIS    2025250    183200   17.9300  148.5800       9.2        29       895        97
VIS    2025250    183200   17.9300  148.5500       9.3        27       895        96
VIS    2025250    183200   17.9200  148.5300       8.9        34       901        97
VIS    2025250    183200   17.9300  148.5100       8.8        33       928        97
VIS    2025250    183200   17.9100  148.4900       8.8        31       939        95
VIS    2025250    183200   17.9100  148.2900       8.9        31       889        93
VIS    2025250    183200   17.9100  148.2600       9.2        36       889        97
VIS    2025250    183200   17.9100  148.2400       9.6        32       889        97
VIS    2025250    183200   17.9200  148.2200       9.4        26       870        94
VIS    2025250    183200   17.9300  148.2100       9.2        23       947        91
VIS    2025250    183200   17.9100  148.0900      10.1        31       987        92
VIS    2025250    183200   17.9300  148.0800      10.3        30       987        97
VIS    2025250    183200   17.9300  148.0400       9.4        21       987        98
VIS    2025250    183200   17.9300  148.0400       9.1        21       985        98
VIS    2025250    183200   17.9100  148.0000      10.0        19       973        99
VIS    2025250    183200   17.9100  147.9700      11.9        11       973        92
VIS    2025250    183200   17.9100  147.9600      11.8        11       973        91
VIS    2025250    183200   17.9200  147.9200      10.2        22       984        98
VIS    2025250    183200   17.9000  147.9000      10.8        22       971        99
VIS    2025250    183200   17.9000  147.8800      10.8        24       957        97
VIS    2025250    183200   17.9200  147.8500      10.9        26       944        97
VIS    2025250    183200   17.9200  147.8100      11.2        16       974        99
VIS    2025250    183200   17.9100  147.7800      11.2        17       970        99
VIS    2025250    183200   17.9100  147.7500      11.8        10       968        96
VIS    2025250    183200   17.9200  147.7400      11.3        12       962        97
VIS    2025250    183200   17.9000  147.7100      11.2        14       932        93
VIS    2025250    183200   17.9200  147.6500      11.4        23       958        96
VIS    2025250    183200   17.9100  147.6300      11.4        24       963        95
VIS    2025250    183200   17.9000  147.6200      11.6        24       958        90
VIS    2025250    183200   17.9200  147.5300      10.2        27       951        93
VIS    2025250    183200   17.9200  147.5100      10.3        24       937        94
VIS    2025250    183200   17.9100  147.4900      10.3        22       935        92
VIS    2025250    183200   17.9200  147.4600      10.5        25       918        92
VIS    2025250    183200   17.9100  147.4300      10.8        26       846        93
VIS    2025250    183200   17.9200  147.4200      10.9        26       829        91
VIS    2025250    183200   17.9000  147.3900      10.4        27       820        93
VIS    2025250    183200   17.9000  147.3700      10.1        35       765        92
VIS    2025250    183200   17.9000  147.3200       9.4        34       791        90
VIS    2025250    183200   17.9100  147.2800       9.1        38       804        95
VIS    2025250    183200   17.9200  147.2700       9.4        36       823        95
VIS    2025250    183200   17.9200  147.2500       9.4        33       823        94
VIS    2025250    183200   17.9100  147.2100       9.8        34       782        95
VIS    2025250    183200   17.9100  147.2000       9.7        38       758        94
VIS    2025250    183200   17.9100  147.1600       9.4        44       735        95
VIS    2025250    183200   17.9000  145.5300       9.8        39       185        97
VIS    2025250    183200   17.9000  145.5000       9.8        35       180        95
VIS    2025250    183200   17.8900  144.7000      16.1       188       184        90
VIS    2025250    183200   17.8800  144.1200      19.5       177       182        91
VIS    2025250    183200   17.8800  143.9700      18.0       173       188        96
VIS    2025250    183200   17.8800  143.9500      17.7       176       191        95
VIS    2025250    183200   17.8700  143.9400      19.2       179       193        91
VIS    2025250    183200   17.9000  148.6600       9.3        42       985        91
VIS    2025250    183200   17.9000  148.5900       9.8        39       893        94
VIS    2025250    183200   17.9000  148.5600       9.8        37       892        96
VIS    2025250    183200   17.9100  148.5500       9.7        34       894        96
VIS    2025250    183200   17.9100  148.5100       9.2        35       905        95
VIS    2025250    183200   17.9000  148.4900       9.1        31       939        97
VIS    2025250    183200   17.9000  148.2800       8.8        33       892        96
VIS    2025250    183200   17.8800  148.2400       9.7        28       891        96
VIS    2025250    183200   17.8800  148.2200      10.6        30       872        98
VIS    2025250    183200   17.9000  148.2200      10.0        29       889        96
VIS    2025250    183200   17.8800  148.1400       9.9        19       992        97
VIS    2025250    183200   17.8800  148.0900      10.4        36       990        92
VIS    2025250    183200   17.9000  148.0400      10.2        25       983        93
VIS    2025250    183200   17.9000  148.0000      10.1        20       976        99
VIS    2025250    183200   17.9000  147.9900      10.5        18       973        99
VIS    2025250    183200   17.8900  147.9600      11.5        11       973        90
VIS    2025250    183200   17.8800  147.9000      10.0        24       980        98
VIS    2025250    183200   17.8800  147.8900      10.2        23       972        97
VIS    2025250    183200   17.8900  147.7800      11.0        19       974       100
VIS    2025250    183200   17.8900  147.7700      11.5        14       974        99
VIS    2025250    183200   17.8900  147.7400      11.7        10       968        95
VIS    2025250    183200   17.8900  147.7200      11.7        10       955        93
VIS    2025250    183200   17.8900  147.7000      11.3        14       904        91
VIS    2025250    183200   17.8900  147.6800      11.0        19       889        93
VIS    2025250    183200   17.8800  147.5900      10.9        35       932        91
VIS    2025250    183200   17.8800  147.5500       9.7        36       955        93
VIS    2025250    183200   17.8800  147.5200       9.6        24       935        95
VIS    2025250    183200   17.8800  147.4400      10.7        22       959        98
VIS    2025250    183200   17.8800  147.4100      10.4        16       892        94
VIS    2025250    183200   17.8900  147.4000      10.4        24       824        92
VIS    2025250    183200   17.8900  147.3200       9.5        34       792        92
VIS    2025250    183200   17.8700  147.2900       9.7        36       822        97
VIS    2025250    183200   17.8800  147.2800       9.6        38       808        98
VIS    2025250    183200   17.8800  147.2500      10.3        34       771        96
VIS    2025250    183200   17.8800  147.2100      10.0        40       771        99
VIS    2025250    183200   17.8700  147.2100       9.9        39       771        99
VIS    2025250    183200   17.8800  147.1700       9.9        48       756        96
VIS    2025250    183200   17.8900  147.1600       9.8        46       735        93
VIS    2025250    183200   17.8600  145.5000      10.2        25       188        93
VIS    2025250    183200   17.8700  144.1300      20.0       178       182        93
VIS    2025250    183200   17.8500  144.0000      20.9       179       188        91
VIS    2025250    183200   17.8500  143.9900      20.9       179       188        91
VIS    2025250    183200   17.8500  143.9800      21.7       179       188        90
VIS    2025250    183200   17.8700  143.9300      19.6       179       193        91
VIS    2025250    183200   17.8800  148.6600       9.2        43       982        91
VIS    2025250    183200   17.8700  148.6400       9.2        44       928        91
VIS    2025250    183200   17.8600  148.6300       9.2        44       916        93
VIS    2025250    183200   17.8700  148.6000       9.9        41       893        97
VIS    2025250    183200   17.8600  148.5600       9.6        39       890        99
VIS    2025250    183200   17.8600  148.5500       9.6        37       891        99
VIS    2025250    183200   17.8800  148.5100       9.7        38       896        94
VIS    2025250    183200   17.8800  148.4900       9.7        39       917        92
VIS    2025250    183200   17.8600  148.4500       9.6        39       936        93
VIS    2025250    183200   17.8800  148.3500       8.5        10       965        96
VIS    2025250    183200   17.8800  148.3100       8.6        21       933        93
VIS    2025250    183200   17.8600  148.2700       9.1        29       903        98
VIS    2025250    183200   17.8600  148.2400       9.8        24       892        94
VIS    2025250    183200   17.8700  148.2200      10.2        29       871        98
VIS    2025250    183200   17.8600  148.2000      12.1        31       872        94
VIS    2025250    183200   17.8600  148.1600      11.0        34       978        96
VIS    2025250    183200   17.8600  148.1400       9.2        27       986        96
VIS    2025250    183200   17.8800  148.1400       9.8        21       992        99
VIS    2025250    183200   17.8800  148.0900      10.2        39       990        90
VIS    2025250    183200   17.8600  148.0200      10.4        20       986        98
VIS    2025250    183200   17.8700  147.9900      10.4        17       979        99
VIS    2025250    183200   17.8700  147.8900      10.0        21       986        98
VIS    2025250    183200   17.8600  147.8900      10.1        20       986        98
VIS    2025250    183200   17.8700  147.7700      11.2        16       986        97
VIS    2025250    183200   17.8700  147.7600      11.4        13       986        96
VIS    2025250    183200   17.8500  147.7100      10.9        12       968        92
VIS    2025250    183200   17.8700  147.6900      11.1        12       910        90
VIS    2025250    183200   17.8600  147.6500      11.6        18       878        93
VIS    2025250    183200   17.8500  147.6400      12.0        16       877        93
VIS    2025250    183200   17.8500  147.6000      11.7        30       880        96
VIS    2025250    183200   17.8500  147.5800      10.9        34       910        97
VIS    2025250    183200   17.8700  147.5600      10.2        36       953        94
VIS    2025250    183200   17.8500  147.5400      10.2        29       943        97
VIS    2025250    183200   17.8600  147.5100       9.6        23       937        95
VIS    2025250    183200   17.8600  147.4900      10.0        20       948        93
VIS    2025250    183200   17.8600  147.4700      10.6        20       970        97
VIS    2025250    183200   17.8500  147.4300      10.4        18       960        96
VIS    2025250    183200   17.8700  147.4000       9.7        20       838        90
VIS    2025250    183200   17.8700  147.3800       9.1        37       815        91
VIS    2025250    183200   17.8700  147.2900       9.7        37       822        97
VIS    2025250    183200   17.8500  147.2700      10.0        33       807        96
VIS    2025250    183200   17.8500  147.2500      11.0        29       800        95
VIS    2025250    183200   17.8500  147.2100      10.1        30       793        97
VIS    2025250    183200   17.8500  147.2000       9.8        33       786        98
VIS    2025250    183200   17.8600  147.1600       9.9        45       718        98
VIS    2025250    183200   17.8500  145.4900      10.2        19       186        90
VIS    2025250    183200   17.8400  144.1900      16.6       180       186        96
VIS    2025250    183200   17.8400  144.1100      22.8       177       183        90
VIS    2025250    183200   17.8300  144.0500      14.3       179       185        95
VIS    2025250    183200   17.8400  144.0000      20.4       179       188        92
VIS    2025250    183200   17.8400  143.9900      20.1       180       188        92
VIS    2025250    183200   17.8600  148.6500       9.0        45       982        90
VIS    2025250    183200   17.8400  148.6300       8.7        46       934        90
VIS    2025250    183200   17.8400  148.6100       9.1        44       898        97
VIS    2025250    183200   17.8600  148.5900       9.4        40       891        99
VIS    2025250    183200   17.8400  148.5600       9.1        37       891        98
VIS    2025250    183200   17.8500  148.5300       9.4        36       892        97
VIS    2025250    183200   17.8400  148.5200       9.3        37       892        96
VIS    2025250    183200   17.8600  148.4800      10.0        42       908        93
VIS    2025250    183200   17.8500  148.4700      10.0        42       903        93
VIS    2025250    183200   17.8500  148.4400       9.5        35       936        94
VIS    2025250    183200   17.8400  148.4000       9.3        21       967        91
VIS    2025250    183200   17.8400  148.4000       9.4        21       967        92
VIS    2025250    183200   17.8500  148.3300       9.6        20       976        99
VIS    2025250    183200   17.8500  148.3300       9.4        21       976        93
VIS    2025250    183200   17.8500  148.2900       9.0        29       946        94
VIS    2025250    183200   17.8400  148.2700       9.2        26       924        99
VIS    2025250    183200   17.8500  148.2300       9.9        24       872        98
VIS    2025250    183200   17.8500  148.2100      11.0        30       871        97
VIS    2025250    183200   17.8500  148.2000      12.0        31       872        95
VIS    2025250    183200   17.8500  148.1700      11.1        35       967        95
VIS    2025250    183200   17.8400  148.1500       9.1        36       967        92
VIS    2025250    183200   17.8500  147.9200      10.0        19       995        90
VIS    2025250    183200   17.8300  147.8900      11.0        12       986        96
VIS    2025250    183200   17.8300  147.8700      10.5        13       970        96
VIS    2025250    183200   17.8300  147.8500      10.5        11       971        94
VIS    2025250    183200   17.8400  147.6300      11.6        19       877        94
VIS    2025250    183200   17.8300  147.6100      11.0        27       877        97
VIS    2025250    183200   17.8500  147.5800      10.7        33       924        97
VIS    2025250    183200   17.8400  147.5400      10.3        29       939        97
VIS    2025250    183200   17.8400  147.5400      10.4        28       939        97
VIS    2025250    183200   17.8500  147.5000      10.1        19       937        94
VIS    2025250    183200   17.8500  147.4900      10.3        20       929        93
VIS    2025250    183200   17.8300  147.4600      11.1        23       948        95
VIS    2025250    183200   17.8400  147.4400      10.9        21       970        98
VIS    2025250    183200   17.8500  147.4000       9.1        28       910        94
VIS    2025250    183200   17.8400  147.2500      10.9        28       807        94
VIS    2025250    183200   17.8300  147.2400      10.6        26       807        95
VIS    2025250    183200   17.8200  147.2100      10.1        23       807        92
VIS    2025250    183200   17.8300  147.1900      10.0        24       807        93
VIS    2025250    183200   17.8200  147.1600      10.8        31       718        95
VIS    2025250    183200   17.8200  144.0900      21.5       178       183        92
VIS    2025250    183200   17.8200  144.0700      17.5       181       183        94
VIS    2025250    183200   17.8100  144.0400      14.3       181       183        92
VIS    2025250    183200   17.8100  143.9900      20.7       177       187        92
VIS    2025250    183200   17.8300  150.1700       7.9        37       981        95
VIS    2025250    183200   17.8300  148.6200       8.7        46       916        92
VIS    2025250    183200   17.8300  148.6100       9.1        44       898        97
VIS    2025250    183200   17.8100  148.5800       9.2        40       895        97
VIS    2025250    183200   17.8300  148.5400       9.2        37       891        93
VIS    2025250    183200   17.8300  148.5200       9.2        40       892        95
VIS    2025250    183200   17.8300  148.5000       9.4        42       892        96
VIS    2025250    183200   17.8100  148.4700       9.4        37       899        95
VIS    2025250    183200   17.8300  148.4600       9.7        38       901        96
VIS    2025250    183200   17.8100  148.4200       8.9        34       936        96
VIS    2025250    183200   17.8300  148.3400       9.2        17       955        98
VIS    2025250    183200   17.8200  148.3300       9.4        17       961        99
VIS    2025250    183200   17.8300  148.3000       9.7        30       976        94
VIS    2025250    183200   17.8300  148.2700       9.3        25       924        99
VIS    2025250    183200   17.8200  148.2500       9.1        27       924        97
VIS    2025250    183200   17.8100  148.2300       9.1        28       924        95
VIS    2025250    183200   17.8100  148.1900      10.4        34       867        99
VIS    2025250    183200   17.8200  148.1800      10.3        37       870        99
VIS    2025250    183200   17.8200  148.1400       8.4        45       878        95
VIS    2025250    183200   17.8200  148.1400       8.2        46       939        91
VIS    2025250    183200   17.8100  148.0200      10.5        41       988        93
VIS    2025250    183200   17.8300  147.8700      10.6        12       970        95
VIS    2025250    183200   17.8200  147.8500      10.6        11       970        95
VIS    2025250    183200   17.8100  147.7900      10.1        26       985        96
VIS    2025250    183200   17.8100  147.6600      12.3         8       908        92
VIS    2025250    183200   17.8200  147.6500      11.2        13       894        90
VIS    2025250    183200   17.8200  147.6100      10.9        27       877        97
VIS    2025250    183200   17.8000  147.5800      11.2        18       891        92
VIS    2025250    183200   17.8000  147.5500      10.8        16       924        92
VIS    2025250    183200   17.8000  147.5400      10.6        17       927        94
VIS    2025250    183200   17.8100  147.5100      10.9        19       939        95
VIS    2025250    183200   17.8000  147.5000      11.1        18       925        92
VIS    2025250    183200   17.8100  147.4700      11.2        21       915        90
VIS    2025250    183200   17.8200  147.4300      10.9        25       960        96
VIS    2025250    183200   17.8100  147.4200      10.8        30       959        95
VIS    2025250    183200   17.8200  147.2700      10.5        36       807        92
VIS    2025250    183200   17.8100  147.2400      10.4        28       807        90
VIS    2025250    183200   17.8100  147.2200       9.7        27       807        93
VIS    2025250    183200   17.7800  144.2600      22.3       190       180        90
VIS    2025250    183200   17.7900  144.1000      21.3       179       183        92
VIS    2025250    183200   17.7800  144.0800      19.9       180       186        93
VIS    2025250    183200   17.7900  144.0700      19.3       179       183        95
VIS    2025250    183200   17.7900  144.0400      17.8       178       184        94
VIS    2025250    183200   17.7900  143.9900      21.1       176       187        90
VIS    2025250    183200   17.8100  148.5800       9.4        41       896        97
VIS    2025250    183200   17.7900  148.5500       9.6        44       892        91
VIS    2025250    183200   17.8100  148.5400       9.4        44       891        91
VIS    2025250    183200   17.8000  148.5200       9.2        46       891        91
VIS    2025250    183200   17.8000  148.4700       9.2        38       892        95
VIS    2025250    183200   17.8100  148.4600       9.4        36       903        95
VIS    2025250    183200   17.8100  148.4300       9.0        36       915        96
VIS    2025250    183200   17.8000  148.4200       8.9        36       915        97
VIS    2025250    183200   17.7900  148.3800       9.2        22       952        99
VIS    2025250    183200   17.8000  148.3500       9.1        16       955        98
VIS    2025250    183200   17.7900  148.3100      10.4        27       972        94
VIS    2025250    183200   17.7900  148.2900      10.8        30       960        93
VIS    2025250    183200   17.7900  148.2500       9.5        32       931        91
VIS    2025250    183200   17.8000  148.2300       8.9        27       931        93
VIS    2025250    183200   17.7900  148.2100       9.4        25       877        97
VIS    2025250    183200   17.8000  148.1900      10.3        33       866        99
VIS    2025250    183200   17.8000  148.1500       9.0        39       868        99
VIS    2025250    183200   17.7900  148.1400       8.4        38       868        99
VIS    2025250    183200   17.7800  148.1000       9.3        38       954        93
VIS    2025250    183200   17.7900  147.8700      10.3        12       990        91
VIS    2025250    183200   17.7900  147.8400      10.7        11       973        92
VIS    2025250    183200   17.7900  147.8200      11.5         9       986        93
VIS    2025250    183200   17.7800  147.6700      11.2        12       911        93
VIS    2025250    183200   17.8000  147.6400      10.7        16       877        93
VIS    2025250    183200   17.7900  147.6300      10.6        18       877        94
VIS    2025250    183200   17.7900  147.6100      10.7        23       877        96
VIS    2025250    183200   17.8000  147.5800      11.2        18       891        92
VIS    2025250    183200   17.7800  147.5400      11.3        15       922        92
VIS    2025250    183200   17.7900  147.5300      11.0        16       925        94
VIS    2025250    183200   17.8000  147.5100      11.2        17       927        93
VIS    2025250    183200   17.7800  147.4900      11.2        16       913        91
VIS    2025250    183200   17.8000  147.4300      11.1        27       939        93
VIS    2025250    183200   17.7900  147.3900       9.5        37       771        95
VIS    2025250    183200   17.8000  147.2700      10.7        35       814        94
VIS    2025250    183200   17.7900  147.2500      11.0        29       814        90
VIS    2025250    183200   17.7900  147.2400      10.8        29       814        90
VIS    2025250    183200   17.7900  147.2000      10.3        21       817        90
VIS    2025250    183200   17.7900  147.1900      10.4        21       817        90
VIS    2025250    183200   17.7700  147.1500       9.9        26       784        93
VIS    2025250    183200   17.7900  147.1300       9.2        32       737        93
VIS    2025250    183200   17.7600  144.3500      17.9       204       186        91
VIS    2025250    183200   17.7500  144.0100      16.6       174       190        96
VIS    2025250    183200   17.7800  148.6400       9.4        43       939        90
VIS    2025250    183200   17.7700  148.5900      10.2        35       900        91
VIS    2025250    183200   17.7700  148.5500      10.2        37       894        94
VIS    2025250    183200   17.7700  148.5200       9.6        42       892        95
VIS    2025250    183200   17.7600  148.5100       9.6        42       892        96
VIS    2025250    183200   17.7700  148.4800       9.2        42       892        96
VIS    2025250    183200   17.7700  148.4600       9.2        41       894        95
VIS    2025250    183200   17.7700  148.4400       8.9        38       905        96
VIS    2025250    183200   17.7800  148.4000       9.1        26       930        97
VIS    2025250    183200   17.7800  148.3900       9.2        26       949        97
VIS    2025250    183200   17.7800  148.3600       9.0        18       961        96
VIS    2025250    183200   17.7800  148.3400       8.9        14       974        94
VIS    2025250    183200   17.7800  148.3200       8.6        21       979        98
VIS    2025250    183200   17.7700  148.2900      10.0        27       931        90
VIS    2025250    183200   17.7800  148.2500       9.5        33       931        92
VIS    2025250    183200   17.7800  148.2400       9.0        32       931        94
VIS    2025250    183200   17.7600  148.2000       9.1        31       952        95
VIS    2025250    183200   17.7600  148.1800       9.5        36       944        93
VIS    2025250    183200   17.7800  148.1600       9.4        32       868        99
VIS    2025250    183200   17.7800  148.1300       9.2        25       868        99
VIS    2025250    183200   17.7700  148.1200       9.3        25       868        99
VIS    2025250    183200   17.7600  148.0900      10.1        36       976        95
VIS    2025250    183200   17.7600  147.8600      10.3        11       986        92
VIS    2025250    183200   17.7700  147.8400      11.0        11       983        93
VIS    2025250    183200   17.7700  147.8300      11.6        10       983        92
VIS    2025250    183200   17.7700  147.6600      10.1        17       960        96
VIS    2025250    183200   17.7600  147.6600       9.8        18       960        95
VIS    2025250    183200   17.7600  147.6200      10.1        21       874        95
VIS    2025250    183200   17.7700  147.5900      10.6        25       877        97
VIS    2025250    183200   17.7700  147.5600      11.2        19       917        90
VIS    2025250    183200   17.7600  147.5200      11.3        16       925        94
VIS    2025250    183200   17.7700  147.5100      11.5        14       925        93
VIS    2025250    183200   17.7600  147.4700      11.0        14       911        93
VIS    2025250    183200   17.7700  147.2800       9.5        47       712        91
VIS    2025250    183200   17.7500  147.2200      10.3        35       811        95
VIS    2025250    183200   17.7700  147.2100      10.1        32       817        97
VIS    2025250    183200   17.7600  147.1900      10.4        30       817        99
VIS    2025250    183200   17.7500  147.1500      10.2        28       786       100
VIS    2025250    183200   17.7700  147.1200       8.5        45       737        90
VIS    2025250    183200   17.7500  147.1000       8.6        51       714        97
VIS    2025250    183200   17.7600  147.0800       8.9        49       704        97
VIS    2025250    183200   17.7400  144.7300      11.7       212       179        90
VIS    2025250    183200   17.7400  144.7100      11.4       208       179        91
VIS    2025250    183200   17.7400  144.6200      12.5       199       175        91
VIS    2025250    183200   17.7400  144.5600      12.3       221       188        90
VIS    2025250    183200   17.7300  144.2000      16.6       192       190        92
VIS    2025250    183200   17.7200  144.0300      16.3       181       194        98
VIS    2025250    183200   17.7600  148.5100       9.6        42       892        96
VIS    2025250    183200   17.7600  148.5000       9.6        42       892        96
VIS    2025250    183200   17.7500  148.4600       9.1        43       893        97
VIS    2025250    183200   17.7500  148.4400       8.9        37       900        98
VIS    2025250    183200   17.7400  148.4100       9.3        27       924        97
VIS    2025250    183200   17.7500  148.3900       9.6        20       938        97
VIS    2025250    183200   17.7500  148.2400       9.0        37       931        91
VIS    2025250    183200   17.7400  148.2200       9.3        37       957        90
VIS    2025250    183200   17.7600  148.2000       9.3        33       952        95
VIS    2025250    183200   17.7600  148.1800       9.7        34       944        93
VIS    2025250    183200   17.7500  148.1400      10.1        21       933        99
VIS    2025250    183200   17.7600  148.1300      10.0        19       885        98
VIS    2025250    183200   17.7500  148.0900      10.1        35       970        95
VIS    2025250    183200   17.7500  148.0800       9.9        39       976        93
VIS    2025250    183200   17.7500  147.8200      11.0         9       981        91
VIS    2025250    183200   17.7300  147.6700       9.9        17       982        96
VIS    2025250    183200   17.7400  147.6400       9.7        23       912        94
VIS    2025250    183200   17.7300  147.6100      10.5        24       876        97
VIS    2025250    183200   17.7300  147.6000      10.9        25       870        97
VIS    2025250    183200   17.7500  147.5400      11.3        21       924        95
VIS    2025250    183200   17.7500  147.5100      11.2        17       937        96
VIS    2025250    183200   17.7300  147.5000      10.6        16       942        97
VIS    2025250    183200   17.7300  147.4700      10.6        15       927        94
VIS    2025250    183200   17.7400  147.2700      10.0        45       727        90
VIS    2025250    183200   17.7300  147.2600      10.4        43       766        97
VIS    2025250    183200   17.7500  147.2200      10.2        35       807        96
VIS    2025250    183200   17.7500  147.2000      10.1        34       817        98
VIS    2025250    183200   17.7300  147.1700      10.2        30       793        99
VIS    2025250    183200   17.7300  147.1500      10.2        26       788        99
VIS    2025250    183200   17.7300  147.1300       9.5        24       767        99
VIS    2025250    183200   17.7300  147.1200       9.8        21       714        92
VIS    2025250    183200   17.7100  145.3400       6.0       332       173        92
VIS    2025250    183200   17.7100  145.3300       5.7       331       173        90
VIS    2025250    183200   17.7100  145.1500       7.0       251       186        93
VIS    2025250    183200   17.7100  145.1400       7.1       252       186        93
VIS    2025250    183200   17.7200  145.0600       9.5       227       183        91
VIS    2025250    183200   17.7200  145.0500      10.0       228       183        91
VIS    2025250    183200   17.7100  145.0100      10.6       231       167        93
VIS    2025250    183200   17.7100  145.0000      10.4       232       166        93
VIS    2025250    183200   17.7200  144.7300      11.7       210       183        92
VIS    2025250    183200   17.7100  144.6900      11.9       200       179        91
VIS    2025250    183200   17.7100  144.6800      11.8       200       179        90
VIS    2025250    183200   17.7200  144.3400      18.4       205       188        94
VIS    2025250    183200   17.7200  144.3100      18.6       202       183        94
VIS    2025250    183200   17.7100  144.1500      14.5       194       192        95
VIS    2025250    183200   17.7200  148.5600       8.6        39       885        93
VIS    2025250    183200   17.7400  148.5300      10.1        38       883        96
VIS    2025250    183200   17.7200  148.5000       9.9        42       884        95
VIS    2025250    183200   17.7300  148.4800       9.8        42       886        94
VIS    2025250    183200   17.7100  148.4500       9.3        38       893        95
VIS    2025250    183200   17.7100  148.4400       9.3        36       899        96
VIS    2025250    183200   17.7300  148.4100       9.4        25       926        95
VIS    2025250    183200   17.7300  148.2100      10.0        34       959        94
VIS    2025250    183200   17.7200  148.1900      10.0        28       952        96
VIS    2025250    183200   17.7200  148.1600      10.0        28       947        94
VIS    2025250    183200   17.7300  148.1300       9.8        25       956        96
VIS    2025250    183200   17.7300  148.1200       9.7        22       956        96
VIS    2025250    183200   17.7300  148.0900      10.6        29       959        91
VIS    2025250    183200   17.7200  148.0700      10.9        32       972        90
VIS    2025250    183200   17.7200  147.6900      10.5        15       989        95
VIS    2025250    183200   17.7300  147.6700       9.6        21       967        95
VIS    2025250    183200   17.7300  147.6500       9.5        26       960        94
VIS    2025250    183200   17.7200  147.6100      10.9        26       877        98
VIS    2025250    183200   17.7100  147.6000      10.8        31       877        96
VIS    2025250    183200   17.7300  147.5800      10.6        30       891        95
VIS    2025250    183200   17.7200  147.5600      10.8        24       912        96
VIS    2025250    183200   17.7200  147.5200      10.7        18       953        96
VIS    2025250    183200   17.7000  147.4900      10.8        15       953        96
VIS    2025250    183200   17.7000  147.2400      11.7        33       769        94
VIS    2025250    183200   17.7100  147.2200      10.9        29       769        94
VIS    2025250    183200   17.7200  147.2100      10.6        27       777        95
VIS    2025250    183200   17.7000  147.1700      10.2        21       777        96
VIS    2025250    183200   17.7100  147.1600      10.2        21       777        96
VIS    2025250    183200   17.7200  147.1100      10.4        19       714        90
VIS    2025250    183200   17.7000  145.3400       5.8       336       168        94
VIS    2025250    183200   17.7000  145.3400       5.7       332       168        93
VIS    2025250    183200   17.6900  145.1500       6.5       256       182        92
VIS    2025250    183200   17.6900  145.1400       6.6       254       182        92
VIS    2025250    183200   17.6900  145.0700       8.8       233       181        93
VIS    2025250    183200   17.6900  145.0600       8.6       237       181        95
VIS    2025250    183200   17.6800  145.0500       8.4       242       180        94
VIS    2025250    183200   17.7000  145.0000      10.2       233       166        94
VIS    2025250    183200   17.6900  144.9900       9.7       233       164        94
VIS    2025250    183200   17.7000  144.9600       9.6       231       178        94
VIS    2025250    183200   17.6900  144.9300      10.4       221       179        90
VIS    2025250    183200   17.7000  144.7300      10.7       210       182        91
VIS    2025250    183200   17.6800  144.3200      19.3       212       187        95
VIS    2025250    183200   17.6800  144.2800      22.1       200       183        90
VIS    2025250    183200   17.6900  148.6600       9.5        34       959        91
VIS    2025250    183200   17.7000  148.6400       8.9        41       948        90
VIS    2025250    183200   17.7000  148.6300       8.8        42       939        91
VIS    2025250    183200   17.7000  148.5800       8.6        45       896        95
VIS    2025250    183200   17.7000  148.5800       8.4        46       890        95
VIS    2025250    183200   17.6900  148.5500       8.8        40       885        97
VIS    2025250    183200   17.7100  148.5100       9.6        44       882        97
VIS    2025250    183200   17.7100  148.5000       9.7        44       883        96
VIS    2025250    183200   17.7000  148.4600       9.5        42       884        95
VIS    2025250    183200   17.7100  148.4600       9.6        41       886        95
VIS    2025250    183200   17.6900  148.4300       8.9        31       894        98
VIS    2025250    183200   17.6900  148.3900       9.3        19       923        99
VIS    2025250    183200   17.7000  148.2000       9.7        35       947        93
VIS    2025250    183200   17.7100  148.1500       9.7        31       956        91
VIS    2025250    183200   17.7000  148.0900      10.5        28       948        93
VIS    2025250    183200   17.6900  147.6800      10.5        21       967        93
VIS    2025250    183200   17.6800  147.6700      10.1        24       965        95
VIS    2025250    183200   17.6800  147.6400       9.8        28       915        96
VIS    2025250    183200   17.6800  147.6200      10.5        28       877        99
VIS    2025250    183200   17.7000  147.5700      10.9        27       891        96
VIS    2025250    183200   17.7000  147.5500      11.3        20       908        95
VIS    2025250    183200   17.6800  147.5300      11.9        19       947        97
VIS    2025250    183200   17.6900  147.5000      10.6        16       956        94
VIS    2025250    183200   17.7000  147.4900      10.9        15       953        95
VIS    2025250    183200   17.6800  147.2600      11.0        32       769        93
VIS    2025250    183200   17.7000  147.2400      11.5        31       769        93
VIS    2025250    183200   17.6800  145.1700       6.0       258       182        91
VIS    2025250    183200   17.6600  145.1500       6.2       257       169        94
VIS    2025250    183200   17.6600  145.1200       6.7       255       178        94
VIS    2025250    183200   17.6700  145.1000       7.4       247       178        96
VIS    2025250    183200   17.6700  145.0600       7.9       247       168        98
VIS    2025250    183200   17.6800  145.0500       8.3       245       173        96
VIS    2025250    183200   17.6600  145.0300       7.9       244       180        91
VIS    2025250    183200   17.6600  145.0000       8.9       230       167        94
VIS    2025250    183200   17.6800  144.9800       9.8       231       167        94
VIS    2025250    183200   17.6600  144.9600      10.4       228       170        93
VIS    2025250    183200   17.6700  144.9200      10.7       221       179        90
VIS    2025250    183200   17.6500  144.3300      14.3       218       187        93
VIS    2025250    183200   17.6500  144.3000      18.8       205       185        97
VIS    2025250    183200   17.6500  144.2700      20.6       200       188        92
VIS    2025250    183200   17.6700  148.6600       8.9        27       948        92
VIS    2025250    183200   17.6800  148.6400       8.5        41       948        91
VIS    2025250    183200   17.6800  148.6200       8.3        49       922        91
VIS    2025250    183200   17.6800  148.6100       8.4        48       920        91
VIS    2025250    183200   17.6700  148.5600       8.9        37       890        99
VIS    2025250    183200   17.6900  148.5400       9.0        40       885        97
VIS    2025250    183200   17.6800  148.5300       9.0        42       885        97
VIS    2025250    183200   17.6800  148.5000       9.0        44       882        96
VIS    2025250    183200   17.6700  148.4800       8.8        42       882        98
VIS    2025250    183200   17.6700  148.4400       8.9        40       885        93
VIS    2025250    183200   17.6800  148.4200       8.7        28       904        98
VIS    2025250    183200   17.6800  148.4100       8.8        24       909        98
VIS    2025250    183200   17.6600  148.3800       9.3        16       909        94
VIS    2025250    183200   17.6700  148.3000       8.4        40       950        91
VIS    2025250    183200   17.6800  148.2800       8.3        45       931        90
VIS    2025250    183200   17.6600  148.2600       9.4        38       928        90
VIS    2025250    183200   17.6600  148.2300       8.8        41       931        90
VIS    2025250    183200   17.6600  148.1500       9.6        30       962        91
VIS    2025250    183200   17.6600  148.1200      10.0        25       959        97
VIS    2025250    183200   17.6600  148.1100      10.3        26       938        97
VIS    2025250    183200   17.6600  148.0800       9.5        39       936        92
VIS    2025250    183200   17.6800  147.7200      12.3         8       987        93
VIS    2025250    183200   17.6600  147.6900      11.8        11       975        98
VIS    2025250    183200   17.6600  147.6600      10.6        15       968        94
VIS    2025250    183200   17.6700  147.6500       9.9        22       960        93
VIS    2025250    183200   17.6700  147.6200       9.9        26       877        99
VIS    2025250    183200   17.6600  147.6000      10.1        25       873       100
VIS    2025250    183200   17.6700  147.5700      11.8        24       868        97
VIS    2025250    183200   17.6700  147.5400      12.1        25       908        97
VIS    2025250    183200   17.6600  147.5300      11.8        23       912        97
VIS    2025250    183200   17.6700  147.4900      10.8        15       947        92
VIS    2025250    183200   17.6700  147.4700      11.5        12       944        90
VIS    2025250    183200   17.6600  147.4400      11.4        12       942        95
VIS    2025250    183200   17.6700  147.2300      10.8        24       769        92
VIS    2025250    183200   17.6500  145.3100       5.5       338       163        91
VIS    2025250    183200   17.6300  145.1500       6.2       268       168        90
VIS    2025250    183200   17.6400  145.1100       6.9       263       179        93
VIS    2025250    183200   17.6400  145.1000       6.9       264       178        93
VIS    2025250    183200   17.6400  145.0600       7.3       254       168        94
VIS    2025250    183200   17.6300  145.0300       8.1       243       173        95
VIS    2025250    183200   17.6300  145.0300       8.2       241       173        95
VIS    2025250    183200   17.6400  145.0000       8.3       237       167        96
VIS    2025250    183200   17.6500  144.9700      10.0       230       167        94
VIS    2025250    183200   17.6300  144.9400       9.6       232       180        90
VIS    2025250    183200   17.6400  144.9300      10.5       226       180        90
VIS    2025250    183200   17.6300  144.8900      10.6       221       179        90
VIS    2025250    183200   17.6300  144.3800      15.1       225       188        93
VIS    2025250    183200   17.6400  144.3300      14.3       215       187        94
VIS    2025250    183200   17.6300  144.3100      17.4       207       187        98
VIS    2025250    183200   17.6500  144.2900      19.4       203       186        96
VIS    2025250    183200   17.6600  148.5700       8.9        36       894        98
VIS    2025250    183200   17.6500  148.5400       9.4        37       885        95
VIS    2025250    183200   17.6400  148.5400       9.3        37       885        96
VIS    2025250    183200   17.6500  148.5100       9.2        41       884        98
VIS    2025250    183200   17.6500  148.4900       8.8        42       884        98
VIS    2025250    183200   17.6400  148.4500       8.7        43       881        95
VIS    2025250    183200   17.6600  148.4300       8.9        40       884        91
VIS    2025250    183200   17.6600  148.3900       8.9        23       894        94
VIS    2025250    183200   17.6400  148.3800       8.9        18       909        93
VIS    2025250    183200   17.6400  148.2800       8.9        38       931        92
VIS    2025250    183200   17.6600  148.2600       9.3        39       928        92
VIS    2025250    183200   17.6400  148.2300       9.3        39       931        92
VIS    2025250    183200   17.6500  148.1800       8.8        39       951        90
VIS    2025250    183200   17.6400  148.1500       9.7        30       962        95
VIS    2025250    183200   17.6500  148.1200       9.7        27       959        91
VIS    2025250    183200   17.6600  148.1000      10.1        27       938        97
VIS    2025250    183200   17.6400  148.0900       9.3        30       938        93
VIS    2025250    183200   17.6300  147.8600      11.0        14       991        99
VIS    2025250    183200   17.6500  147.7700      10.8         6       987        96
VIS    2025250    183200   17.6500  147.6800      11.3        12       993        99
VIS    2025250    183200   17.6500  147.6600      10.5        15       968        94
VIS    2025250    183200   17.6500  147.6400       9.9        20       960        95
VIS    2025250    183200   17.6300  147.6000      10.5        18       926        98
VIS    2025250    183200   17.6500  147.6000      10.3        19       866        98
VIS    2025250    183200   17.6400  147.5500      11.6        25       854        94
VIS    2025250    183200   17.6400  147.5300      11.8        27       873        92
VIS    2025250    183200   17.6500  147.4400      10.7        13       944        90
VIS    2025250    183200   17.6400  147.4000       9.4         7       969        90
VIS    2025250    183200   17.6300  147.2400      11.1        15       742        93
VIS    2025250    183200   17.6400  147.2300      11.6        15       741        91
VIS    2025250    183200   17.6100  145.5000       8.7       344       185        95
VIS    2025250    183200   17.6200  145.2900       5.6       336       160        92
VIS    2025250    183200   17.6200  145.2700       6.0       329       155        93
VIS    2025250    183200   17.6200  145.1100       6.6       269       183        90
VIS    2025250    183200   17.6100  145.0800       6.5       271       184        90
VIS    2025250    183200   17.6200  145.0600       7.2       254       166        94
VIS    2025250    183200   17.6300  145.0300       8.3       242       173        95
VIS    2025250    183200   17.6100  145.0100       8.2       250       173        93
VIS    2025250    183200   17.6200  144.9900       8.1       246       166        93
VIS    2025250    183200   17.6200  144.9500       8.2       247       180        95
VIS    2025250    183200   17.6300  144.9500       9.0       236       180        92
VIS    2025250    183200   17.6200  144.9200       9.0       229       180        93
VIS    2025250    183200   17.6200  144.8900       9.6       225       179        91
VIS    2025250    183200   17.6300  144.8000      10.6       227       186        90
VIS    2025250    183200   17.6100  144.7700      10.6       225       186        90
VIS    2025250    183200   17.6200  144.3800      16.2       224       186        97
VIS    2025250    183200   17.6200  144.3500      12.7       221       186        94
VIS    2025250    183200   17.6200  144.3400      13.3       217       187        95
VIS    2025250    183200   17.6200  144.3100      17.4       208       187        97
VIS    2025250    183200   17.6200  148.5900       8.5        32       910        91
VIS    2025250    183200   17.6400  148.5600       8.8        33       891        97
VIS    2025250    183200   17.6400  148.5400       9.1        37       889        97
VIS    2025250    183200   17.6300  148.5200       9.0        40       885        98
VIS    2025250    183200   17.6300  148.4800       8.6        41       883        99
VIS    2025250    183200   17.6300  148.4700       8.5        40       883        99
VIS    2025250    183200   17.6200  148.4500       8.7        38       880       100
VIS    2025250    183200   17.6300  148.4100       8.8        35       877        93
VIS    2025250    183200   17.6300  148.3800       8.7        23       909        92
VIS    2025250    183200   17.6200  148.3700       8.7        27       889        90
VIS    2025250    183200   17.6200  148.2100       8.7        37       947        90
VIS    2025250    183200   17.6200  148.1600       8.8        41       962        90
VIS    2025250    183200   17.6100  148.1400       8.9        34       961        93
VIS    2025250    183200   17.6100  148.1200       9.1        30       961        94
VIS    2025250    183200   17.6300  148.0900       8.5        38       938        92
VIS    2025250    183200   17.6100  148.0300       8.4        41       959        90
VIS    2025250    183200   17.6300  147.8800      11.2        14       991        99
VIS    2025250    183200   17.6200  147.8600      11.1        10       991        97
VIS    2025250    183200   17.6100  147.8300      11.1        12       987        98
VIS    2025250    183200   17.6100  147.8200      11.0        12       962        98
VIS    2025250    183200   17.6100  147.7900      10.4        12       972        99
VIS    2025250    183200   17.6100  147.7700      10.4        14       972        99
VIS    2025250    183200   17.6300  147.7300      10.7        22       990        96
VIS    2025250    183200   17.6100  147.6800      11.1        12       989        98
VIS    2025250    183200   17.6100  147.6700      11.1        10       989        99
VIS    2025250    183200   17.6200  147.6500      10.7        14       984        98
VIS    2025250    183200   17.6100  147.6200      10.1        22       939        96
VIS    2025250    183200   17.6300  147.5900      11.0        15       865        98
VIS    2025250    183200   17.6200  147.5800      11.4        16       865        98
VIS    2025250    183200   17.6300  147.5400      11.4        25       848        93
VIS    2025250    183200   17.6100  147.3900       9.6        18       942        95
VIS    2025250    183200   17.6100  147.3800       9.2        25       920        94
VIS    2025250    183200   17.6000  147.2800      10.1        16       868        97
VIS    2025250    183200   17.6000  147.2300      10.3        19       747        93
VIS    2025250    183200   17.6000  145.4700       8.2       341       185        92
VIS    2025250    183200   17.5900  145.2700       5.9       332       160        94
VIS    2025250    183200   17.5900  145.2500       6.1       320       160        97
VIS    2025250    183200   17.5900  145.2400       5.6       312       160        96
VIS    2025250    183200   17.5900  145.0600       6.5       268       183        90
VIS    2025250    183200   17.6000  145.0400       7.2       253       171        95
VIS    2025250    183200   17.6000  145.0200       7.9       254       179        91
VIS    2025250    183200   17.6000  144.9600       7.6       255       180        90
VIS    2025250    183200   17.5800  144.9400       6.7       254       184        90
VIS    2025250    183200   17.6000  144.9100       7.3       242       182        93
VIS    2025250    183200   17.6000  144.8800       9.0       236       180        93
VIS    2025250    183200   17.5900  144.8800       8.9       242       182        94
VIS    2025250    183200   17.6000  148.7600       9.4        25       972        97
VIS    2025250    183200   17.6000  148.7500       9.8        26       970        95
VIS    2025250    183200   17.5900  148.7100      11.4        31       955        92
VIS    2025250    183200   17.6100  148.5800       9.1        19       909        95
VIS    2025250    183200   17.5900  148.5400       8.8        29       890        97
VIS    2025250    183200   17.6000  148.5200       8.7        33       889        99
VIS    2025250    183200   17.6100  148.5000       8.8        38       885        99
VIS    2025250    183200   17.6100  148.4700       8.6        38       884        99
VIS    2025250    183200   17.5900  148.4600       9.1        36       891        99
VIS    2025250    183200   17.6000  148.4300       8.9        33       880        99
VIS    2025250    183200   17.6000  148.3900       9.0        31       878        99
VIS    2025250    183200   17.6100  148.3700       9.1        28       881        93
VIS    2025250    183200   17.6000  148.3600       9.3        29       892        95
VIS    2025250    183200   17.5900  148.3200       8.1        34       948        90
VIS    2025250    183200   17.5900  148.2800       7.8        48       910        92
VIS    2025250    183200   17.6100  148.1500       8.8        38       962        91
VIS    2025250    183200   17.6100  148.1200       8.9        32       961        93
VIS    2025250    183200   17.6100  148.0300       8.4        40       955        91
VIS    2025250    183200   17.6100  148.0000       9.2        16       983        97
VIS    2025250    183200   17.6100  147.8700      11.5        10       991        98
VIS    2025250    183200   17.5900  147.8400      11.3        12       962        98
VIS    2025250    183200   17.6100  147.8300      11.3        11       962        96
VIS    2025250    183200   17.6000  147.8100      10.9        14       962        97
VIS    2025250    183200   17.5900  147.7900      11.0        13       952        99
VIS    2025250    183200   17.6000  147.7100      10.8        16       981        96
VIS    2025250    183200   17.5900  147.6700      11.2        12       981        97
VIS    2025250    183200   17.5900  147.6500      10.8        13       984        98
VIS    2025250    183200   17.5900  147.6200      10.3        18       965        97
VIS    2025250    183200   17.5900  147.6100      10.3        17       955        97
VIS    2025250    183200   17.5800  147.5900      10.7        19       918        97
VIS    2025250    183200   17.5900  147.5500      11.0        20       852        98
VIS    2025250    183200   17.5800  147.5200      10.9        21       845        97
VIS    2025250    183200   17.5800  147.5200      10.9        22       845        96
VIS    2025250    183200   17.5900  147.4800      11.0        29       854        91
VIS    2025250    183200   17.5900  147.3600       9.9        25       905        97
VIS    2025250    183200   17.6000  147.3500      10.2        28       900        97
VIS    2025250    183200   17.5800  147.3200      10.5        28       869        98
VIS    2025250    183200   17.6000  147.2900      10.2        17       884        98
VIS    2025250    183200   17.5800  147.2600      10.9        14       884        95
VIS    2025250    183200   17.6000  147.2500      10.5        17       816        90
VIS    2025250    183200   17.5800  145.2800       6.1       343       166        92
VIS    2025250    183200   17.5800  144.9800       7.6       265       181        92
VIS    2025250    183200   17.5800  144.9500       6.7       257       184        90
VIS    2025250    183200   17.5700  144.4000      15.3       222       188        93
VIS    2025250    183200   17.5900  150.1700       7.5        25       977        95
VIS    2025250    183200   17.5800  148.7600       9.1        25       972        99
VIS    2025250    183200   17.5700  148.7300       9.3        23       967        96
VIS    2025250    183200   17.5900  148.7100      11.1        31       955        92
VIS    2025250    183200   17.5700  148.5600       9.0        22       916       100
VIS    2025250    183200   17.5700  148.5400       8.4        36       895        99
VIS    2025250    183200   17.5800  148.5200       8.7        35       890        99
VIS    2025250    183200   17.5800  148.5100       8.7        36       890        99
VIS    2025250    183200   17.5700  148.4800       9.4        37       898        99
VIS    2025250    183200   17.5900  148.4500       9.2        35       891       100
VIS    2025250    183200   17.5700  148.4200       9.0        29       894        96
VIS    2025250    183200   17.5700  148.4100       9.1        27       886        93
VIS    2025250    183200   17.5800  148.3400       8.8        32       908        99
VIS    2025250    183200   17.5800  148.3400       8.7        27       908        97
VIS    2025250    183200   17.5700  148.3000       7.7        24       923        98
VIS    2025250    183200   17.5700  148.2800       7.9        34       913        96
VIS    2025250    183200   17.5700  148.2600       8.6        46       910        91
VIS    2025250    183200   17.5800  147.9700       9.4         8       982        92
VIS    2025250    183200   17.5800  147.8800      10.9         9       991        95
VIS    2025250    183200   17.5800  147.8500      11.1        11       986        96
VIS    2025250    183200   17.5800  147.8400      11.1        12       959        96
VIS    2025250    183200   17.5700  147.8000      10.9        15       932       100
VIS    2025250    183200   17.5800  147.7800      11.2        14       948       100
VIS    2025250    183200   17.5600  147.7500      11.1        17       948        98
VIS    2025250    183200   17.5600  147.7500      11.0        17       972        98
VIS    2025250    183200   17.5700  147.6800      11.1        17       975        93
VIS    2025250    183200   17.5800  147.6500      10.7        13       977        97
VIS    2025250    183200   17.5800  147.5900      10.6        17       918        96
VIS    2025250    183200   17.5700  147.5700      11.0        19       866        97
VIS    2025250    183200   17.5600  147.5500      10.5        21       859        96
VIS    2025250    183200   17.5600  147.5100      10.9        21       849        97
VIS    2025250    183200   17.5600  147.5000      11.1        21       845        97
VIS    2025250    183200   17.5800  147.4600      11.4        25       854        93
VIS    2025250    183200   17.5700  147.4600      11.8        22       854        94
VIS    2025250    183200   17.5600  147.4100      12.7        18       849        93
VIS    2025250    183200   17.5800  147.3600       9.8        26       905        96
VIS    2025250    183200   17.5700  147.3600       9.7        25       905        96
VIS    2025250    183200   17.5700  147.3200      10.2        25       888        99
VIS    2025250    183200   17.5700  147.2900      10.7        14       888        98
VIS    2025250    183200   17.5800  147.2700      10.9        13       884        94
VIS    2025250    183200   17.5700  147.2600      10.9        13       884        91
VIS    2025250    183200   17.5500  145.0100       6.3       267       183        90
VIS    2025250    183200   17.5600  144.9900       6.4       267       181        91
VIS    2025250    183200   17.5400  144.9600       6.3       250       175        94
VIS    2025250    183200   17.5600  150.2000       7.7        28       977        91
VIS    2025250    183200   17.5700  148.7700       9.2        23       972        99
VIS    2025250    183200   17.5600  148.6000       9.5        21       975        95
VIS    2025250    183200   17.5600  148.5700       9.1        22       918       100
VIS    2025250    183200   17.5600  148.5600       9.0        23       916       100
VIS    2025250    183200   17.5500  148.5200       8.7        35       898       100
VIS    2025250    183200   17.5600  148.5000       8.9        37       895        99
VIS    2025250    183200   17.5600  148.4700       9.7        38       901        98
VIS    2025250    183200   17.5600  148.4600       9.8        40       903        96
VIS    2025250    183200   17.5400  148.4200       9.6        34       928        94
VIS    2025250    183200   17.5600  148.4000       9.3        26       913        95
VIS    2025250    183200   17.5600  148.3800       9.1        23       908        90
VIS    2025250    183200   17.5600  148.3700       9.2        21       908        91
VIS    2025250    183200   17.5600  148.3400       9.1        17       909        98
VIS    2025250    183200   17.5400  148.3200       9.1        12       917        97
VIS    2025250    183200   17.5600  148.2800       8.0        32       912        97
VIS    2025250    183200   17.5600  148.2500       8.5        44       912        92
VIS    2025250    183200   17.5400  147.9400       9.2         7       982        96
VIS    2025250    183200   17.5400  147.9000       8.2       358       979        94
VIS    2025250    183200   17.5600  147.8600      10.9        11       993        94
VIS    2025250    183200   17.5500  147.8300      10.8        14       946        98
VIS    2025250    183200   17.5400  147.8100      11.1        14       936        99
VIS    2025250    183200   17.5500  147.8000      11.0        16       929        99
VIS    2025250    183200   17.5400  147.7700      11.2        17       929       100
VIS    2025250    183200   17.5400  147.7000      11.2        16       964        97
VIS    2025250    183200   17.5300  147.6000      11.6        10       983        96
VIS    2025250    183200   17.5300  147.5800      11.4        12       949        95
VIS    2025250    183200   17.5500  147.5500      10.4        22       859        96
VIS    2025250    183200   17.5500  147.5300      10.5        21       856        95
VIS    2025250    183200   17.5300  147.5100      10.9        17       856        96
VIS    2025250    183200   17.5300  147.4600      11.5        15       863        97
VIS    2025250    183200   17.5400  147.4600      11.5        15       863        97
VIS    2025250    183200   17.5300  147.4300      11.2        18       854        98
VIS    2025250    183200   17.5500  147.3400       9.2        22       870        97
VIS    2025250    183200   17.5400  147.2900      10.1        10       870        96
VIS    2025250    183200   17.5500  147.2700       9.8        10       880        94
VIS    2025250    183200   17.5300  147.2500       9.9        12       867        94
VIS    2025250    183200   17.5300  147.2400       9.9        16       859        95
VIS    2025250    183200   17.5400  147.2100       9.3        27       810        96
VIS    2025250    183200   17.5200  145.0500       6.7       254       184        90
VIS    2025250    183200   17.5300  145.0100       6.4       271       182        91
VIS    2025250    183200   17.5300  144.9500       6.3       247       175        93
VIS    2025250    183200   17.5200  148.6100       8.9        11       993        98
VIS    2025250    183200   17.5200  148.5800       8.9        15       949        97
VIS    2025250    183200   17.5300  148.5500       8.7        23       924        99
VIS    2025250    183200   17.5400  148.5100       8.9        32       899       100
VIS    2025250    183200   17.5300  148.5000       9.1        29       899       100
VIS    2025250    183200   17.5200  148.4600       9.9        36       901        98
VIS    2025250    183200   17.5400  148.4500      10.1        39       922        93
VIS    2025250    183200   17.5400  148.4200       9.6        32       928        96
VIS    2025250    183200   17.5300  148.4000       9.7        28       928        96
VIS    2025250    183200   17.5300  148.3700       9.2        19       913        92
VIS    2025250    183200   17.5200  148.3400       9.4        14       917        93
VIS    2025250    183200   17.5200  148.3300       9.7        12       917        95
VIS    2025250    183200   17.5400  148.3100       9.2        12       917        97
VIS    2025250    183200   17.5200  148.2800       9.3        22       912        97
VIS    2025250    183200   17.5200  148.2600       8.9        27       912        95
VIS    2025250    183200   17.5200  148.1500       8.5        46       927        90
VIS    2025250    183200   17.5100  148.0200       9.4        39       966        91
VIS    2025250    183200   17.5300  147.9500       9.3         9       979        94
VIS    2025250    183200   17.5300  147.9400       9.0         7       989        97
VIS    2025250    183200   17.5100  147.9100       8.7         3       979        96
VIS    2025250    183200   17.5200  147.8900       7.8       360       989        94
VIS    2025250    183200   17.5300  147.8500      10.8        11       993        94
VIS    2025250    183200   17.5200  147.8300      11.3        10       981        96
VIS    2025250    183200   17.5300  147.8000      11.2        14       935        99
VIS    2025250    183200   17.5300  147.7900      11.1        16       929       100
VIS    2025250    183200   17.5300  147.7500      11.1        16       930        99
VIS    2025250    183200   17.5100  147.7300      11.0        15       953        97
VIS    2025250    183200   17.5200  147.7100      11.4        15       964        97
VIS    2025250    183200   17.5100  147.6800      11.2        22       983        91
VIS    2025250    183200   17.5100  147.6700      11.3        28       983        91
VIS    2025250    183200   17.5100  147.5800      12.1         9       976        97
VIS    2025250    183200   17.5200  147.5600      11.1        13       918        94
VIS    2025250    183200   17.5100  147.5500      10.8        15       893        95
VIS    2025250    183200   17.5300  147.5100      10.7        17       856        96
VIS    2025250    183200   17.5200  147.4800      11.7        11       863        94
VIS    2025250    183200   17.5200  147.4600      11.5        15       874        96
VIS    2025250    183200   17.5200  147.4500      11.4        15       874        97
VIS    2025250    183200   17.5300  147.4300      11.1        18       854        98
VIS    2025250    183200   17.5100  147.4000      11.5        16       854        91
VIS    2025250    183200   17.5100  147.3600      10.9        16       854        91
VIS    2025250    183200   17.5200  147.3400      10.8        12       868        97
VIS    2025250    183200   17.5300  147.2900      10.1         8       869        94
VIS    2025250    183200   17.5100  147.2600       9.8        11       867        94
VIS    2025250    183200   17.5300  147.2400       9.9        16       859        96
VIS    2025250    183200   17.5200  147.2300      10.0        16       853        97
VIS    2025250    183200   17.5100  147.2100      10.4        14       806        96
VIS    2025250    183200   17.5100  145.0500       6.3       247       185        90
VIS    2025250    183200   17.4900  145.0400       5.9       267       185        90
VIS    2025250    183200   17.5000  148.6500      10.0        19       993        95
VIS    2025250    183200   17.5000  148.6200       9.5        13       993        97
VIS    2025250    183200   17.5100  148.5700       9.1        12       984        98
VIS    2025250    183200   17.5000  148.5700       9.2        11       971        99
VIS    2025250    183200   17.5000  148.5400       9.2        15       942        99
VIS    2025250    183200   17.5000  148.5200       9.2        22       915       100
VIS    2025250    183200   17.5100  148.5000       9.4        24       901        98
VIS    2025250    183200   17.5100  148.4500       9.9        34       904        97
VIS    2025250    183200   17.5100  148.4400      10.0        34       910        96
VIS    2025250    183200   17.5000  148.4000       9.5        22       922        99
VIS    2025250    183200   17.4900  148.3900       9.5        21       909        98
VIS    2025250    183200   17.5100  148.3500       9.3        17       909        94
VIS    2025250    183200   17.5100  148.3400       9.3        16       909        92
VIS    2025250    183200   17.5100  148.3200       9.8        12       917        95
VIS    2025250    183200   17.5000  148.2600       9.4        17       912        93
VIS    2025250    183200   17.5100  148.0300       9.1        37       951        91
VIS    2025250    183200   17.5000  148.0300       9.2        34       945        93
VIS    2025250    183200   17.4900  148.0000      10.1        27       953        96
VIS    2025250    183200   17.5100  147.9100       8.8         4       981        97
VIS    2025250    183200   17.4900  147.9000       8.9         5       981        96
VIS    2025250    183200   17.5000  147.8400      10.9         7       989        97
VIS    2025250    183200   17.5100  147.8100      12.0        10       940        95
VIS    2025250    183200   17.4900  147.7900      11.6        13       940        97
VIS    2025250    183200   17.5000  147.7800      11.3        14       933        99
VIS    2025250    183200   17.5000  147.7400      10.9        17       947        98
VIS    2025250    183200   17.5100  147.7400      10.9        16       953        98
VIS    2025250    183200   17.5000  147.7000      10.9        18       965        95
VIS    2025250    183200   17.5000  147.6800      11.1        19       965        96
VIS    2025250    183200   17.4900  147.6400      11.1        16       974        98
VIS    2025250    183200   17.4900  147.6400      11.2        15       974        98
VIS    2025250    183200   17.5000  147.6000      12.4         8       983        97
VIS    2025250    183200   17.5000  147.5800      12.3         8       976        98
VIS    2025250    183200   17.5000  147.5400      11.3        11       894        95
VIS    2025250    183200   17.4800  147.5300      11.3        10       891        96
VIS    2025250    183200   17.5000  147.5100      10.3        15       874        98
VIS    2025250    183200   17.4800  147.4800      10.1        11       874        93
VIS    2025250    183200   17.4800  147.4500      10.6        15       874        92
VIS    2025250    183200   17.4800  147.4400      10.9        14       860        91
VIS    2025250    183200   17.4900  147.4200      11.0        16       860        91
VIS    2025250    183200   17.4800  147.3700      10.7        14       854        96
VIS    2025250    183200   17.4900  147.3600      10.9        13       854        96
VIS    2025250    183200   17.4800  147.3200      11.1         9       810        90
VIS    2025250    183200   17.5000  147.3000      11.3         8       851        92
VIS    2025250    183200   17.5000  147.2500      10.2        10       867        93
VIS    2025250    183200   17.5000  147.2300      10.8        11       852        97
VIS    2025250    183200   17.4900  147.2200      11.0         9       816        93
VIS    2025250    183200   17.4800  147.1800       9.8        13       756        96
VIS    2025250    183200   17.4800  147.1700       9.5        15       740        97
VIS    2025250    183200   17.4700  145.0100       6.2       271       185        90
VIS    2025250    183200   17.4900  148.6400      10.0        18       993        96
VIS    2025250    183200   17.4900  148.6200       9.6        14       993        97
VIS    2025250    183200   17.4700  148.5900      10.5         9       984        97
VIS    2025250    183200   17.4900  148.5700       9.5         8       984        98
VIS    2025250    183200   17.4800  148.5600       9.7         9       984        97
VIS    2025250    183200   17.4800  148.5400       9.4        13       949        97
VIS    2025250    183200   17.4900  148.5100       8.9        22       924        99
VIS    2025250    183200   17.4700  148.4700       8.8        25       911        97
VIS    2025250    183200   17.4700  148.4600       8.8        25       911        97
VIS    2025250    183200   17.4700  148.4200       9.0        28       892        98
VIS    2025250    183200   17.4900  148.4100       9.4        24       907        99
VIS    2025250    183200   17.4900  148.3900       9.4        21       908        98
VIS    2025250    183200   17.4700  148.3700       9.1        25       908        99
VIS    2025250    183200   17.4700  148.0600       8.5        41       956        91
VIS    2025250    183200   17.4700  148.0300       9.9        24       949        95
VIS    2025250    183200   17.4600  147.9900      10.0        25       959        94
VIS    2025250    183200   17.4600  147.9600      10.1        19       975        98
VIS    2025250    183200   17.4600  147.9500      10.0        16       975        98
VIS    2025250    183200   17.4600  147.9100       9.2        11       981        92
VIS    2025250    183200   17.4800  147.8900       8.4         6       981        94
VIS    2025250    183200   17.4600  147.8700       8.4         5       975        93
VIS    2025250    183200   17.4700  147.8500       8.4         0       981        92
VIS    2025250    183200   17.4700  147.8200      11.9         7       987        94
VIS    2025250    183200   17.4800  147.7900      11.4        13       940        98
VIS    2025250    183200   17.4800  147.7600      10.6        16       932        98
VIS    2025250    183200   17.4700  147.7500      10.5        15       944        96
VIS    2025250    183200   17.4800  147.7100      10.5        17       949        95
VIS    2025250    183200   17.4700  147.7000      10.6        17       947        95
VIS    2025250    183200   17.4700  147.6700      10.8        18       960        97
VIS    2025250    183200   17.4700  147.6400      11.1        14       964        97
VIS    2025250    183200   17.4600  147.6200      11.5         8       965        96
VIS    2025250    183200   17.4800  147.6000      12.0         7       974        99
VIS    2025250    183200   17.4700  147.5600      12.1         6       920        94
VIS    2025250    183200   17.4700  147.5500      12.0         6       914        92
VIS    2025250    183200   17.4600  147.5200      11.4         7       887        93
VIS    2025250    183200   17.4600  147.4900      10.5        10       876        94
VIS    2025250    183200   17.4800  147.4800      10.1         9       874        92
VIS    2025250    183200   17.4800  147.4500      10.7        13       860        90
VIS    2025250    183200   17.4800  147.4300      10.9        13       860        91
VIS    2025250    183200   17.4700  147.4000      10.2        13       857        91
VIS    2025250    183200   17.4800  147.3700      10.7        13       846        95
VIS    2025250    183200   17.4600  147.3600       9.9        14       845        95
VIS    2025250    183200   17.4600  147.3400      10.8         9       817        91
VIS    2025250    183200   17.4800  147.2400      11.2         7       867        91
VIS    2025250    183200   17.4700  147.2300      11.6         7       852        94
VIS    2025250    183200   17.4800  147.2000      10.9        10       782        93
VIS    2025250    183200   17.4700  147.1700       9.0        19       740        95
VIS    2025250    183200   17.4500  148.6800      10.2        23       932        99
VIS    2025250    183200   17.4500  148.6700      10.4        19       932        98
VIS    2025250    183200   17.4600  148.6300      10.4        18       973        98
VIS    2025250    183200   17.4600  148.6100      10.8        13       973        99
VIS    2025250    183200   17.4600  148.5800      10.7         9       984        98
VIS    2025250    183200   17.4600  148.5800      10.6        10       984        98
VIS    2025250    183200   17.4700  148.5300       9.9         9       971        96
VIS    2025250    183200   17.4700  148.5200       9.5        12       942        99
VIS    2025250    183200   17.4500  148.5000       9.5        11       969        99
VIS    2025250    183200   17.4600  148.4600       9.0        23       912        98
VIS    2025250    183200   17.4500  148.4300       8.8        30       911        97
VIS    2025250    183200   17.4500  148.4300       8.7        31       898        96
VIS    2025250    183200   17.4500  148.3800       9.3        25       890        92
VIS    2025250    183200   17.4600  148.3600       8.8        29       910        99
VIS    2025250    183200   17.4400  148.2400      10.4        12       909        90
VIS    2025250    183200   17.4400  148.2300      10.8        10       907        97
VIS    2025250    183200   17.4600  148.0600       8.4        41       956        90
VIS    2025250    183200   17.4500  147.8700       8.6         8       968        92
VIS    2025250    183200   17.4500  147.8600       8.6         6       960        92
VIS    2025250    183200   17.4500  147.8300       9.2         1       974        95
VIS    2025250    183200   17.4400  147.7900       9.2         0       961        96
VIS    2025250    183200   17.4400  147.7800       9.6         8       945        98
VIS    2025250    183200   17.4400  147.7500      10.2        13       935        96
VIS    2025250    183200   17.4500  147.7200      10.5        16       935        96
VIS    2025250    183200   17.4500  147.7200      10.5        17       935        97
VIS    2025250    183200   17.4500  147.6800      10.7        18       946        98
VIS    2025250    183200   17.4400  147.6600      10.7        12       953        96
VIS    2025250    183200   17.4600  147.6400      11.1        11       960        97
VIS    2025250    183200   17.4400  147.6000      11.4         8       962        96
VIS    2025250    183200   17.4400  147.5900      11.6         8       962        96
VIS    2025250    183200   17.4400  147.5700      11.5         7       962        96
VIS    2025250    183200   17.4500  147.5500      11.6         7       914        94
VIS    2025250    183200   17.4600  147.5100      11.0         9       887        91
VIS    2025250    183200   17.4500  147.5000      10.7        12       876        93
VIS    2025250    183200   17.4400  147.3300      11.1         5       830        90
VIS    2025250    183200   17.4500  147.2300      11.4         6       893        94
VIS    2025250    183200   17.4400  147.2100      10.9         7       797        91
VIS    2025250    183200   17.4400  147.1800      10.4        10       779        91
VIS    2025250    183200   17.4400  148.6700       9.6        17       931        97
VIS    2025250    183200   17.4300  148.6200       9.3        16       926        90
VIS    2025250    183200   17.4300  148.6000       9.5        16       953        93
VIS    2025250    183200   17.4200  148.5500       9.9        16       970        96
VIS    2025250    183200   17.4200  148.4800      10.1        10       969        99
VIS    2025250    183200   17.4200  148.4600      10.2        15       943       100
VIS    2025250    183200   17.4400  148.4300       9.1        30       914        97
VIS    2025250    183200   17.4300  148.4100       9.4        27       895        96
VIS    2025250    183200   17.4300  148.3800       9.1        25       890        97
VIS    2025250    183200   17.4400  148.3400       8.6        30       910        93
VIS    2025250    183200   17.4300  148.3000       8.7        35       926        94
VIS    2025250    183200   17.4200  148.2700       8.5        32       918        98
VIS    2025250    183200   17.4400  148.2500      10.6        12       909        93
VIS    2025250    183200   17.4400  148.2400      10.6        11       907        94
VIS    2025250    183200   17.4200  148.2100      10.1        13       905        95
VIS    2025250    183200   17.4400  148.1400       8.6        50       859        90
VIS    2025250    183200   17.4400  147.9500       9.3        21       983        91
VIS    2025250    183200   17.4300  147.8800       8.8         9       960        90
VIS    2025250    183200   17.4300  147.8700       8.8         9       953        90
VIS    2025250    183200   17.4300  147.8300       9.1         0       961        95
VIS    2025250    183200   17.4300  147.8200       9.1       359       961        95
VIS    2025250    183200   17.4100  147.7800       9.1       360       938        93
VIS    2025250    183200   17.4100  147.7700       9.2         2       935        94
VIS    2025250    183200   17.4300  147.7400      10.4        11       935        94
VIS    2025250    183200   17.4200  147.7200      10.4        11       951        95
VIS    2025250    183200   17.4300  147.7000      10.8         9       926        95
VIS    2025250    183200   17.4200  147.6600      10.9         6       937        95
VIS    2025250    183200   17.4300  147.6500      10.8         8       939        95
VIS    2025250    183200   17.4300  147.6100      11.2         9       939        92
VIS    2025250    183200   17.4300  147.6000      11.2         8       953        94
VIS    2025250    183200   17.4300  147.5700      11.1         5       958        94
VIS    2025250    183200   17.4200  147.5500      10.9         4       962        95
VIS    2025250    183200   17.4300  147.5100      10.5        15       888        92
VIS    2025250    183200   17.4300  147.4900      11.2        13       864        93
VIS    2025250    183200   17.4100  147.4700      11.9        10       844        92
VIS    2025250    183200   17.4200  147.4500      12.1        11       833        91
VIS    2025250    183200   17.4100  147.4300      10.9        13       836        94
VIS    2025250    183200   17.4300  147.3200      10.9         2       849        90
VIS    2025250    183200   17.4100  147.2500      10.2       360       833        90
VIS    2025250    183200   17.4100  147.2300      10.2         1       878        91
VIS    2025250    183200   17.4100  147.1400       9.2        16       727        97
VIS    2025250    183200   17.4200  147.1400       8.6        22       726        92
VIS    2025250    183200   17.4100  148.5700       9.3        19       960        97
VIS    2025250    183200   17.4200  148.4800      10.2        11       969       100
VIS    2025250    183200   17.4100  148.4400      10.3        17       953        99
VIS    2025250    183200   17.4000  148.4200       9.7        18       932        98
VIS    2025250    183200   17.4100  148.4100       9.2        23       914        99
VIS    2025250    183200   17.4100  148.3800       8.7        25       891        99
VIS    2025250    183200   17.4100  148.3500       8.9        24       885        95
VIS    2025250    183200   17.3900  148.3000       8.9        30       913       100
VIS    2025250    183200   17.4100  148.2700       8.5        34       922        96
VIS    2025250    183200   17.4000  148.2500       8.2        29       922        98
VIS    2025250    183200   17.4100  148.2300       9.3        16       909        95
VIS    2025250    183200   17.4000  148.2100       9.0        12       908        98
VIS    2025250    183200   17.3900  148.1700       8.6        29       858        99
VIS    2025250    183200   17.4000  148.1600       8.6        30       858        99
VIS    2025250    183200   17.4100  148.1200       8.9        41       859        94
VIS    2025250    183200   17.4100  148.1100       8.8        42       861        90
VIS    2025250    183200   17.3900  147.9600       9.0        31       964        94
VIS    2025250    183200   17.4000  147.9200       9.8        26       964        96
VIS    2025250    183200   17.3900  147.9200      10.0        22       964        98
VIS    2025250    183200   17.4100  147.8900       9.2        11       983        96
VIS    2025250    183200   17.4100  147.8700       9.3         9       963        91
VIS    2025250    183200   17.4100  147.8500       9.8         8       955        91
VIS    2025250    183200   17.3900  147.8100      10.2         3       946        93
VIS    2025250    183200   17.4100  147.7900       9.1       357       942        93
VIS    2025250    183200   17.4000  147.7700       9.3         3       935        94
VIS    2025250    183200   17.3900  147.7400       9.6         7       935        94
VIS    2025250    183200   17.4000  147.7100      10.1         5       951        93
VIS    2025250    183200   17.3900  147.6200       8.5        17       899        92
VIS    2025250    183200   17.3900  147.5800      10.1        11       918        92
VIS    2025250    183200   17.3900  147.5400      10.3         6       935        95
VIS    2025250    183200   17.3900  147.5100      10.3        11       928        96
VIS    2025250    183200   17.3900  147.5000      10.4        12       916        97
VIS    2025250    183200   17.4100  147.4700      11.9        10       844        92
VIS    2025250    183200   17.3900  147.4400      11.4         6       844        91
VIS    2025250    183200   17.4100  147.4300      11.0        12       840        94
VIS    2025250    183200   17.3900  147.4000      10.7        10       840        92
VIS    2025250    183200   17.3900  147.2300      10.1       359       853        91
VIS    2025250    183200   17.4000  147.2100      10.2         6       884        91
VIS    2025250    183200   17.4000  147.1800      10.7        10       829        95
VIS    2025250    183200   17.3800  147.1600      10.5        11       810        95
VIS    2025250    183200   17.3800  147.1200       9.1        15       720        90
VIS    2025250    183200   17.3900  148.5700       8.5        19       967        91
VIS    2025250    183200   17.3800  148.5400       9.2        13       980        95
VIS    2025250    183200   17.3900  148.4100       9.4        20       932        97
VIS    2025250    183200   17.3900  148.3900       8.9        24       914        96
VIS    2025250    183200   17.3800  148.3700       8.8        23       923        91
VIS    2025250    183200   17.3800  148.3400       9.7        15       902        92
VIS    2025250    183200   17.3900  148.3200       9.7        19       902        93
VIS    2025250    183200   17.3900  148.2900       8.9        28       909        99
VIS    2025250    183200   17.3800  148.2700       8.9        21       914        98
VIS    2025250    183200   17.3700  148.2600       8.5        19       916        99
VIS    2025250    183200   17.3800  148.2400       7.5        15       922        93
VIS    2025250    183200   17.3800  148.1900       8.3        22       908        96
VIS    2025250    183200   17.3900  148.1800       8.8        25       898        96
VIS    2025250    183200   17.3700  148.1500       8.3        29       895        97
VIS    2025250    183200   17.3700  148.1300       8.3        28       895        97
VIS    2025250    183200   17.3700  148.0900       9.2        38       895        93
VIS    2025250    183200   17.3800  148.0900       9.3        40       914        91
VIS    2025250    183200   17.3700  147.9500       9.9        21       923        99
VIS    2025250    183200   17.3700  147.9300      10.5        16       923       100
VIS    2025250    183200   17.3800  147.9100       9.9        18       956        99
VIS    2025250    183200   17.3800  147.8800       9.3        14       961        98
VIS    2025250    183200   17.3800  147.8600      10.0        10       961        99
VIS    2025250    183200   17.3800  147.8400      10.3        12       955        99
VIS    2025250    183200   17.3700  147.8000      10.7         5       939        92
VIS    2025250    183200   17.3700  147.7900      11.0         5       939        93
VIS    2025250    183200   17.3800  147.7600       9.7         5       935        90
VIS    2025250    183200   17.3800  147.7100      10.0         6       946        93
VIS    2025250    183200   17.3600  147.6900      10.3         8       876        95
VIS    2025250    183200   17.3700  147.6000       8.0        33       899        93
VIS    2025250    183200   17.3600  147.5500      10.6        10       876        95
VIS    2025250    183200   17.3800  147.5400      10.4         6       928        95
VIS    2025250    183200   17.3800  147.5100      10.3        10       928        96
VIS    2025250    183200   17.3800  147.5000      10.4        12       916        97
VIS    2025250    183200   17.3800  147.4800      11.2        11       873        96
VIS    2025250    183200   17.3700  147.4300      10.0         3       864        91
VIS    2025250    183200   17.3700  147.4300      10.1         4       860        92
VIS    2025250    183200   17.3700  147.4000      10.5         8       851        93
VIS    2025250    183200   17.3600  147.3600      10.9         8       830        91
VIS    2025250    183200   17.3700  147.3100      10.4         7       887        92
VIS    2025250    183200   17.3600  147.2600      10.4         1       878        92
VIS    2025250    183200   17.3800  147.2400       9.9       358       871        90
VIS    2025250    183200   17.3600  147.2200      10.6         7       878        95
VIS    2025250    183200   17.3600  147.1900      11.0        11       918        95
VIS    2025250    183200   17.3600  147.1600       9.9        12       862        96
VIS    2025250    183200   17.3700  147.1600      10.1        12       829        97
VIS    2025250    183200   17.3700  147.1200       9.3         8       724        94
VIS    2025250    183200   17.3700  147.1100       9.1         7       720        91
VIS    2025250    183200   17.3600  148.5800       9.7         9       998        99
VIS    2025250    183200   17.3500  148.5500       9.1         9       989        96
VIS    2025250    183200   17.3500  148.5400       9.3        11       972        98
VIS    2025250    183200   17.3500  148.3800       8.7        27       963        92
VIS    2025250    183200   17.3500  148.3800       8.6        26       961        92
VIS    2025250    183200   17.3600  148.3300       9.4        15       902        92
VIS    2025250    183200   17.3400  148.2200       8.0        13       966        91
VIS    2025250    183200   17.3400  148.2000       8.1        24       945        93
VIS    2025250    183200   17.3600  148.1800       8.5        32       907        94
VIS    2025250    183200   17.3400  148.1500       8.3        42       899        91
VIS    2025250    183200   17.3500  148.1200       8.3        31       891        96
VIS    2025250    183200   17.3600  148.0900       9.2        37       895        94
VIS    2025250    183200   17.3500  148.0800       9.2        42       911        91
VIS    2025250    183200   17.3500  148.0400       8.7        42       956        90
VIS    2025250    183200   17.3600  147.9400      10.3        16       923        99
VIS    2025250    183200   17.3600  147.9300      10.7        13       912        99
VIS    2025250    183200   17.3400  147.9000      10.5         7       890        93
VIS    2025250    183200   17.3500  147.8900       9.9        11       894        95
VIS    2025250    183200   17.3500  147.8400      10.2        14       928       100
VIS    2025250    183200   17.3500  147.8200      10.4         8       928        99
VIS    2025250    183200   17.3400  147.8100      10.3         8       928        98
VIS    2025250    183200   17.3600  147.7900      11.1         6       938        97
VIS    2025250    183200   17.3400  147.7300       9.9         1       946        91
VIS    2025250    183200   17.3400  147.7000      10.6         8       855        94
VIS    2025250    183200   17.3400  147.6700      10.5        10       828        91
VIS    2025250    183200   17.3400  147.6700      10.3        10       828        90
VIS    2025250    183200   17.3500  147.5900       7.9        41       899        91
VIS    2025250    183200   17.3600  147.5500      10.4        10       868        95
VIS    2025250    183200   17.3600  147.5400      10.4         9       868        94
VIS    2025250    183200   17.3600  147.5100      10.3        10       891        91
VIS    2025250    183200   17.3500  147.4900      10.2        12       885        92
VIS    2025250    183200   17.3600  147.4500      10.3         8       873        91
VIS    2025250    183200   17.3500  147.4000       9.9         7       860        93
VIS    2025250    183200   17.3500  147.3900      10.5         8       860        94
VIS    2025250    183200   17.3400  147.3500      11.2        11       859        95
VIS    2025250    183200   17.3400  147.3400      10.8        10       864        96
VIS    2025250    183200   17.3400  147.3200      11.0         9       887        96
VIS    2025250    183200   17.3400  147.2900      11.2         8       887        96
VIS    2025250    183200   17.3400  147.2500      11.0         4       873        93
VIS    2025250    183200   17.3400  147.2400      10.9         4       871        94
VIS    2025250    183200   17.3300  147.2100      10.7         4       871        94
VIS    2025250    183200   17.3400  147.2000      10.7         7       890        95
VIS    2025250    183200   17.3500  147.1600       9.8        12       862        96
VIS    2025250    183200   17.3300  147.1300       9.7         6       821        94
VIS    2025250    183200   17.3400  147.1200       9.6         0       771        90
VIS    2025250    183200   17.3300  148.6100       8.9        23       995        94
VIS    2025250    183200   17.3300  148.6000       9.2        20       995        95
VIS    2025250    183200   17.3400  148.5600       9.3         9       989        96
VIS    2025250    183200   17.3300  148.5400       9.6         8       969        95
VIS    2025250    183200   17.3200  148.4800       9.2         8       979        96
VIS    2025250    183200   17.3400  148.3800       8.7        26       975        90
VIS    2025250    183200   17.3400  148.3500       8.7        18       948        92
VIS    2025250    183200   17.3400  148.3300       9.0        12       948        95
VIS    2025250    183200   17.3200  148.2300       9.0        11       989        90
VIS    2025250    183200   17.3300  148.2200       8.8        13       989        94
VIS    2025250    183200   17.3400  148.1900       8.6        25       945        95
VIS    2025250    183200   17.3300  148.1600       8.3        38       940        91
VIS    2025250    183200   17.3300  148.1200       7.9        37       895        93
VIS    2025250    183200   17.3200  148.0900       8.4        35       894        93
VIS    2025250    183200   17.3200  148.0700       8.7        38       894        94
VIS    2025250    183200   17.3200  148.0500       9.0        35       908        95
VIS    2025250    183200   17.3300  148.0100       8.4        41       960        90
VIS    2025250    183200   17.3400  147.9700       8.7        35       965        90
VIS    2025250    183200   17.3200  147.9400       9.3        26       958        93
VIS    2025250    183200   17.3300  147.9100      10.2        13       894        97
VIS    2025250    183200   17.3200  147.8900      10.3        14       890        98
VIS    2025250    183200   17.3200  147.8700      10.5        13       890        96
VIS    2025250    183200   17.3400  147.8600      10.2        14       894        96
VIS    2025250    183200   17.3200  147.8100      10.2         8       904        95
VIS    2025250    183200   17.3300  147.8000      10.4         7       917        98
VIS    2025250    183200   17.3400  147.7700      10.7         7       932        97
VIS    2025250    183200   17.3200  147.7400       9.8         7       937        94
VIS    2025250    183200   17.3300  147.7200       9.8         0       937        93
VIS    2025250    183200   17.3300  147.7100      10.0         1       894        93
VIS    2025250    183200   17.3300  147.6700      11.0         9       828        91
VIS    2025250    183200   17.3200  147.6500      11.3         8       828        91
VIS    2025250    183200   17.3100  147.6000       7.5        33       823        92
VIS    2025250    183200   17.3300  147.5300      10.0        12       891        93
VIS    2025250    183200   17.3100  147.5000       9.1         7       885        92
VIS    2025250    183200   17.3300  147.4800       8.9        13       870        93
VIS    2025250    183200   17.3200  147.4500       8.8        12       864        90
VIS    2025250    183200   17.3300  147.3800      10.9        10       860        90
VIS    2025250    183200   17.3200  147.3200      10.7         6       890        94
VIS    2025250    183200   17.3300  147.3200      11.0         8       888        96
VIS    2025250    183200   17.3100  147.2900      10.5         7       888        92
VIS    2025250    183200   17.3300  147.2500      10.9         3       873        93
VIS    2025250    183200   17.3300  147.2000      10.2         4       871        92
VIS    2025250    183200   17.3200  147.1700       9.6        11       857        95
VIS    2025250    183200   17.3200  147.1300      10.3         7       821        94
VIS    2025250    183200   17.3200  147.1200      10.1         3       810        91
VIS    2025250    183200   17.3300  147.1000       9.4       356       740        90
VIS    2025250    183200   17.3100  147.0700       8.3        10       751        96
VIS    2025250    183200   17.3000  148.6100       8.9        18       999        93
VIS    2025250    183200   17.3000  148.5800       9.7        16       968        98
VIS    2025250    183200   17.3100  148.5700       9.9        14       968        98
VIS    2025250    183200   17.3200  148.5500       9.7         8       968        96
VIS    2025250    183200   17.3100  148.5100       9.5         8       974        97
VIS    2025250    183200   17.3200  148.4900       9.3         9       979        98
VIS    2025250    183200   17.3100  148.4600       9.5        10       999        98
VIS    2025250    183200   17.3000  148.4300       9.7         7       998        99
VIS    2025250    183200   17.3200  148.2000       9.7        16       995        96
VIS    2025250    183200   17.3100  148.1100       7.9        38       901        90
VIS    2025250    183200   17.2900  148.0700       8.0        34       898        91
VIS    2025250    183200   17.3000  148.0500       8.9        33       901        96
VIS    2025250    183200   17.3000  148.0200       9.0        29       908        97
VIS    2025250    183200   17.2900  147.9800       8.6        37       930        91
VIS    2025250    183200   17.2900  147.9500       8.9        31       968        94
VIS    2025250    183200   17.3100  147.9200       9.4        23       910        97
VIS    2025250    183200   17.3100  147.8900      10.1        16       890        99
VIS    2025250    183200   17.3100  147.8700      10.3        13       890        97
VIS    2025250    183200   17.3100  147.8400       9.8        14       891        94
VIS    2025250    183200   17.3100  147.8300       9.9        13       891        93
VIS    2025250    183200   17.3100  147.8100      10.2         9       904        96
VIS    2025250    183200   17.2900  147.7800      10.3        12       895        97
VIS    2025250    183200   17.2900  147.7600      10.6        12       905        98
VIS    2025250    183200   17.3100  147.7400       9.9         7       937        95
VIS    2025250    183200   17.3000  147.7100       9.6       360       926        92
VIS    2025250    183200   17.3100  147.6900       9.9         4       854        92
VIS    2025250    183200   17.3000  147.6500      10.9         6       840        91
VIS    2025250    183200   17.3100  147.6000       7.6        33       823        95
VIS    2025250    183200   17.2900  147.5400       9.7        17       946        96
VIS    2025250    183200   17.2900  147.5100       9.3        10       905        94
VIS    2025250    183200   17.2900  147.4800       7.4        15       859        94
VIS    2025250    183200   17.2900  147.4700       7.2        20       859        93
VIS    2025250    183200   17.3100  147.2900      10.4         6       890        90
VIS    2025250    183200   17.3100  147.2800      10.6         8       880        91
VIS    2025250    183200   17.3000  147.1400       9.8        16       800        96
VIS    2025250    183200   17.2900  147.1300       9.2        23       800        98
VIS    2025250    183200   17.2900  147.1100       9.9         6       800        90
VIS    2025250    183200   17.2900  147.0700       8.7         8       789        94
VIS    2025250    183200   17.3000  147.0600       8.9        19       751        99
VIS    2025250    183200   17.2900  148.6300       9.3         9       999        91
VIS    2025250    183200   17.2800  148.6000       9.8        13       959        98
VIS    2025250    183200   17.2800  148.5700      10.1        16       926        98
VIS    2025250    183200   17.2900  148.5600      10.1        15       926        98
VIS    2025250    183200   17.2900  148.5300       9.2        13       968        95
VIS    2025250    183200   17.2700  148.5100       9.3        17       945        98
VIS    2025250    183200   17.2800  148.4700       9.8        16       956       100
VIS    2025250    183200   17.2800  148.4600      10.0        14       987        98
VIS    2025250    183200   17.2900  148.4300       9.9         7       998        99
VIS    2025250    183200   17.2900  148.1700       9.8        21       995        94
VIS    2025250    183200   17.2800  148.1600       9.9        19       992        92
VIS    2025250    183200   17.2900  148.0400       9.3        33       901        95
VIS    2025250    183200   17.2800  148.0400       9.5        31       901        95
VIS    2025250    183200   17.2700  147.9900       9.6        30       903        96
VIS    2025250    183200   17.2700  147.9800       9.2        33       917        95
VIS    2025250    183200   17.2700  147.9600       9.5        29       945        96
VIS    2025250    183200   17.2700  147.9300       8.9        20       932        98
VIS    2025250    183200   17.2900  147.9200       8.9        27       927        96
VIS    2025250    183200   17.2900  147.8700       9.5        22       898        98
VIS    2025250    183200   17.2800  147.8700       9.4        23       898        98
VIS    2025250    183200   17.2700  147.8100       9.6        17       881        90
VIS    2025250    183200   17.2700  147.7900       9.8        13       881        94
VIS    2025250    183200   17.2700  147.7500      10.6         5       905        95
VIS    2025250    183200   17.2700  147.7200      10.1         3       905        91
VIS    2025250    183200   17.2700  147.7000       9.2         2       897        91
VIS    2025250    183200   17.2700  147.6900       8.8         3       877        90
VIS    2025250    183200   17.2700  147.6200       8.5        11       835        94
VIS    2025250    183200   17.2700  147.5800       8.2        25       836        97
VIS    2025250    183200   17.2700  147.5700       8.4        27       836        98
VIS    2025250    183200   17.2800  147.5500       9.4        24       881        95
VIS    2025250    183200   17.2600  147.5100       8.6        16       891        95
VIS    2025250    183200   17.2600  147.4800       7.1         7       859        90
VIS    2025250    183200   17.2600  147.4500       7.5        15       816        93
VIS    2025250    183200   17.2700  147.4500       7.6        17       816        94
VIS    2025250    183200   17.2800  147.4300       9.2        10       842        94
VIS    2025250    183200   17.2800  147.3900      11.3         8       842        91
VIS    2025250    183200   17.2700  147.3200      10.2         7       859        93
VIS    2025250    183200   17.2800  147.3000      10.0         7       888        90
VIS    2025250    183200   17.2600  147.2700      10.0        15       897        98
VIS    2025250    183200   17.2700  147.2600      10.0        13       897        96
VIS    2025250    183200   17.2600  147.2300      10.1         7       865        93
VIS    2025250    183200   17.2800  147.1200       9.8        20       800        96
VIS    2025250    183200   17.2800  147.1000      10.0         8       793        91
VIS    2025250    183200   17.2600  147.0800      10.2         9       784        92
VIS    2025250    183200   17.2700  147.0600       9.7        15       784        97
VIS    2025250    183200   17.2600  148.6200      10.0         6       986        93
VIS    2025250    183200   17.2500  148.6000      10.3        10       939        97
VIS    2025250    183200   17.2600  148.5900       9.7        16       929        99
VIS    2025250    183200   17.2700  148.5600      10.1        16       920        98
VIS    2025250    183200   17.2600  148.5300       9.7        19       905        97
VIS    2025250    183200   17.2700  148.5100       9.4        17       945        99
VIS    2025250    183200   17.2500  148.4800       9.7        18       920        97
VIS    2025250    183200   17.2500  148.4500       9.9        13       950       100
VIS    2025250    183200   17.2500  148.1800       8.7        29       991        91
VIS    2025250    183200   17.2600  148.1600       9.4        24       992        94
VIS    2025250    183200   17.2500  148.0300       9.8        18       925        95
VIS    2025250    183200   17.2500  148.0100       9.9        20       925        96
VIS    2025250    183200   17.2500  148.0000      10.0        21       925        95
VIS    2025250    183200   17.2600  147.9600       9.6        27       945        96
VIS    2025250    183200   17.2500  147.9400       9.3        16       931        98
VIS    2025250    183200   17.2600  147.9200       9.0        17       930        98
VIS    2025250    183200   17.2500  147.7900       9.8        11       906        94
VIS    2025250    183200   17.2600  147.7700      10.2         9       881        92
VIS    2025250    183200   17.2500  147.7400      10.2         4       904        92
VIS    2025250    183200   17.2600  147.7300      10.2         3       905        92
VIS    2025250    183200   17.2400  147.6800       8.6         2       872        93
VIS    2025250    183200   17.2500  147.6300       8.8         3       810        91
VIS    2025250    183200   17.2500  147.5900       7.8        21       835        90
VIS    2025250    183200   17.2600  147.5400      10.1        21       881        99
VIS    2025250    183200   17.2400  147.5300       9.8        20       888        99
VIS    2025250    183200   17.2400  147.5000       8.3         8       889        92
VIS    2025250    183200   17.2500  147.3000      10.6        13       843        95
VIS    2025250    183200   17.2400  147.2700      10.7        15       863       100
VIS    2025250    183200   17.2400  147.2700      10.7        16       863        98
VIS    2025250    183200   17.2500  147.2400      10.1        12       880        97
VIS    2025250    183200   17.2400  147.2100       9.6        14       865        94
VIS    2025250    183200   17.2400  147.1900       8.3        24       838        94
VIS    2025250    183200   17.2500  147.0900       9.9         9       764        93
VIS    2025250    183200   17.2400  147.0700       9.6         7       757        92
VIS    2025250    183200   17.2600  147.0400       8.2        16       763        97
VIS    2025250    183200   17.2400  148.5700       9.8        17       916        98
VIS    2025250    183200   17.2300  148.5200       9.2        26       900       100
VIS    2025250    183200   17.2300  148.5000       9.2        27       892        96
VIS    2025250    183200   17.2500  148.4800       9.6        19       912        96
VIS    2025250    183200   17.2400  148.1800       8.5        32       989        90
VIS    2025250    183200   17.2300  148.1400       8.4        31       953        90
VIS    2025250    183200   17.2400  148.0400       9.7        16       928        92
VIS    2025250    183200   17.2400  148.0400       9.8        15       928        93
VIS    2025250    183200   17.2300  148.0000       9.5        18       934        95
VIS    2025250    183200   17.2200  147.9800       9.7        17       934        95
VIS    2025250    183200   17.2400  147.9500       9.7        16       930        98
VIS    2025250    183200   17.2300  147.9400       9.6        13       930        99
VIS    2025250    183200   17.2400  147.9200       8.7        10       926        92
VIS    2025250    183200   17.2300  147.7900       9.2        12       906        95
VIS    2025250    183200   17.2300  147.7500       9.7         6       905        96
VIS    2025250    183200   17.2200  147.7300       9.9         8       878        97
VIS    2025250    183200   17.2200  147.7100      10.0         8       874        97
VIS    2025250    183200   17.2400  147.6800       8.8         2       872        92
VIS    2025250    183200   17.2200  147.6700       9.4         3       869        94
VIS    2025250    183200   17.2300  147.6400       9.2         3       839        94
VIS    2025250    183200   17.2200  147.6100       9.3         5       810        92
VIS    2025250    183200   17.2400  147.5600       8.8        25       836        98
VIS    2025250    183200   17.2400  147.5500       9.0        24       859        98
VIS    2025250    183200   17.2200  147.5100      10.1         9       881        99
VIS    2025250    183200   17.2300  147.5000       9.7         8       888        98
VIS    2025250    183200   17.2300  147.3100       9.6        12       780        90
VIS    2025250    183200   17.2300  147.2900      11.0        11       825        93
VIS    2025250    183200   17.2100  147.2700      10.9         8       825        93
VIS    2025250    183200   17.2300  147.2500      10.6        12       865        99
VIS    2025250    183200   17.2100  147.2300      10.1        17       853        97
VIS    2025250    183200   17.2200  147.1900       9.0        25       866        94
VIS    2025250    183200   17.2200  147.1600       8.0        30       818        93
VIS    2025250    183200   17.2300  147.0900       8.7         7       748        90
VIS    2025250    183200   17.2100  147.0700       9.1         3       752        91
VIS    2025250    183200   17.2200  147.0600       9.1         5       752        91
VIS    2025250    183200   17.2100  148.5700       9.4        21       916        97
VIS    2025250    183200   17.2100  148.5600       9.3        23       916        98
VIS    2025250    183200   17.2100  148.5300       9.0        28       916        99
VIS    2025250    183200   17.2000  148.5000       9.1        26       912        99
VIS    2025250    183200   17.2000  148.4700       9.3        25       917        99
VIS    2025250    183200   17.2200  148.4500       9.4        20       933        96
VIS    2025250    183200   17.2200  148.4400       9.3        19       946        96
VIS    2025250    183200   17.2000  148.4100       9.9        11       953        99
VIS    2025250    183200   17.2100  148.1300       9.3        23       949        93
VIS    2025250    183200   17.2000  148.1100      10.0        19       949        96
VIS    2025250    183200   17.2100  148.0400      10.6        18       950        94
VIS    2025250    183200   17.2200  148.0200       9.7        17       947        96
VIS    2025250    183200   17.2000  148.0000       9.3        26       947        91
VIS    2025250    183200   17.2200  147.9700       9.9        13       935        96
VIS    2025250    183200   17.2100  147.9600      10.0        10       935        96
VIS    2025250    183200   17.2000  147.9300       9.9         5       937        98
VIS    2025250    183200   17.2000  147.8900       8.2         8       925        94
VIS    2025250    183200   17.1900  147.8300       9.7        33       911        90
VIS    2025250    183200   17.2100  147.8000       8.7        17       907        96
VIS    2025250    183200   17.1900  147.7700       7.8         9       908        97
VIS    2025250    183200   17.2000  147.7700       8.1         7       908        95
VIS    2025250    183200   17.2100  147.7300       9.8        10       878        97
VIS    2025250    183200   17.2100  147.7000       9.9         9       872        97
VIS    2025250    183200   17.2100  147.6900      10.1         7       872        96
VIS    2025250    183200   17.2000  147.6500      10.9         5       874        96
VIS    2025250    183200   17.1900  147.6400      11.4         4       874        96
VIS    2025250    183200   17.2000  147.6200      10.4         5       829        93
VIS    2025250    183200   17.2000  147.6000       9.6         4       809        91
VIS    2025250    183200   17.2000  147.5300      10.0        12       859        97
VIS    2025250    183200   17.2100  147.5100      10.4         8       881        99
VIS    2025250    183200   17.1900  147.4800       9.8         8       869        97
VIS    2025250    183200   17.1900  147.4700       9.6         7       869        96
VIS    2025250    183200   17.2100  147.2700      10.8         8       825        93
VIS    2025250    183200   17.1900  147.2200      10.3        19       853        97
VIS    2025250    183200   17.1900  147.2100      10.8        17       908        95
VIS    2025250    183200   17.1900  147.1700      11.0        11       880        98
VIS    2025250    183200   17.2100  147.1500       7.6        27       764        94
VIS    2025250    183200   17.2100  147.0700       9.1         3       752        91
VIS    2025250    183200   17.2000  148.5600       9.7        23       945        96
VIS    2025250    183200   17.1900  148.5400       9.8        22       938        91
VIS    2025250    183200   17.1900  148.5200       9.7        22       938        94
VIS    2025250    183200   17.2000  148.4800       9.3        26       930        98
VIS    2025250    183200   17.2000  148.4800       9.4        25       930        99
VIS    2025250    183200   17.1900  148.4400       9.8        19       950        98
VIS    2025250    183200   17.1800  148.2400       9.6        20       985        91
VIS    2025250    183200   17.1700  148.1500      10.2        16       956        92
VIS    2025250    183200   17.1800  148.1100      10.3        16       946        97
VIS    2025250    183200   17.1900  148.0900      10.1        21       945        95
VIS    2025250    183200   17.1700  148.0600      10.5        22       944        91
VIS    2025250    183200   17.1800  148.0500      10.7        23       947        90
VIS    2025250    183200   17.1700  148.0100       9.4        26       940        92
VIS    2025250    183200   17.1700  147.9800       9.4        23       947        94
VIS    2025250    183200   17.1800  147.9600      10.2         9       951        95
VIS    2025250    183200   17.1700  147.9300      10.2         8       947        99
VIS    2025250    183200   17.1900  147.9300      10.3         7       943        99
VIS    2025250    183200   17.1900  147.8900       8.0         9       925        93
VIS    2025250    183200   17.1800  147.8100       8.8        26       908        95
VIS    2025250    183200   17.1900  147.7800       7.9        12       908        98
VIS    2025250    183200   17.1900  147.7500       7.7         9       905        94
VIS    2025250    183200   17.1900  147.7200       8.8        16       866        90
VIS    2025250    183200   17.1800  147.6600      10.9         5       876        92
VIS    2025250    183200   17.1700  147.6400      11.3         2       884        95
VIS    2025250    183200   17.1800  147.6300      11.3         3       882        96
VIS    2025250    183200   17.1700  147.6000      10.2         4       819        92
VIS    2025250    183200   17.1700  147.5800       9.8         4       817        93
VIS    2025250    183200   17.1900  147.5500      10.0         8       805        92
VIS    2025250    183200   17.1800  147.5300       9.6         7       825        94
VIS    2025250    183200   17.1700  147.5100       8.5         4       819        94
VIS    2025250    183200   17.1800  147.4700       9.5        11       847        97
VIS    2025250    183200   17.1800  147.4400       8.7         9       831        94
VIS    2025250    183200   17.1700  147.4400       9.0         9       831        96
VIS    2025250    183200   17.1800  147.4100       6.4        12       783        92
VIS    2025250    183200   17.1700  147.2100      10.8        15       806        95
VIS    2025250    183200   17.1600  147.1900      10.4         9       806        94
VIS    2025250    183200   17.1700  147.1700      11.1         7       855       100
VIS    2025250    183200   17.1600  148.5200      10.3        13       938        91
VIS    2025250    183200   17.1600  148.4800       9.7        20       927        97
VIS    2025250    183200   17.1700  148.4600       9.9        20       942        98
VIS    2025250    183200   17.1600  148.4400       9.7        18       930        99
VIS    2025250    183200   17.1600  148.4100      10.0        11       930        95
VIS    2025250    183200   17.1600  148.2400       9.0        15       977        93
VIS    2025250    183200   17.1700  148.1500      10.9        13       956        97
VIS    2025250    183200   17.1600  148.1300      10.4        14       952        96
VIS    2025250    183200   17.1500  148.1100       9.8        19       952        96
VIS    2025250    183200   17.1700  148.1000       9.9        17       945        97
VIS    2025250    183200   17.1700  148.0700      10.0        21       944        93
VIS    2025250    183200   17.1500  148.0400       9.5        26       939        91
VIS    2025250    183200   17.1500  148.0000       9.5        21       938        94
VIS    2025250    183200   17.1500  147.9800       9.5        22       944        95
VIS    2025250    183200   17.1500  147.9700       9.3        22       944        95
VIS    2025250    183200   17.1700  147.9300      10.1         9       947        99
VIS    2025250    183200   17.1700  147.9000       8.7        17       947        95
VIS    2025250    183200   17.1500  147.7700       8.6        21       905        94
VIS    2025250    183200   17.1500  147.7500       8.6        19       900        98
VIS    2025250    183200   17.1600  147.7100       8.0        18       855        94
VIS    2025250    183200   17.1500  147.6600      10.4         8       896        94
VIS    2025250    183200   17.1500  147.6500      10.5         4       900        95
VIS    2025250    183200   17.1600  147.6100      10.1         3       884        97
VIS    2025250    183200   17.1600  147.6100      10.0         3       884        97
VIS    2025250    183200   17.1400  147.5600       9.2         3       835        94
VIS    2025250    183200   17.1600  147.5500       9.9         5       827        93
VIS    2025250    183200   17.1500  147.5300       9.2         4       827        92
VIS    2025250    183200   17.1600  147.5100       8.2         1       816        93
VIS    2025250    183200   17.1600  147.4700       9.2        10       842        98
VIS    2025250    183200   17.1400  147.4400      10.6        10       835        95
VIS    2025250    183200   17.1500  147.4400       9.9         9       835        96
VIS    2025250    183200   17.1400  147.4100       7.1        25       831        97
VIS    2025250    183200   17.1500  147.1800       9.1         5       806        92
VIS    2025250    183200   17.1600  147.1600       9.8         5       809        98
VIS    2025250    183200   17.1600  147.1500       7.4        12       795        97
VIS    2025250    183200   17.1300  148.5600       9.6        16       956        98
VIS    2025250    183200   17.1300  148.5300      10.0        12       935        98
VIS    2025250    183200   17.1300  148.4800       9.1        23       898        97
VIS    2025250    183200   17.1500  148.4500       9.5        25       902        99
VIS    2025250    183200   17.1400  148.4100       9.5        14       928        97
VIS    2025250    183200   17.1400  148.2300       8.8         7       990        92
VIS    2025250    183200   17.1200  148.1900       9.8         6       987        96
VIS    2025250    183200   17.1200  148.1400      10.5        14       981        97
VIS    2025250    183200   17.1300  148.1100       9.8        21       964        94
VIS    2025250    183200   17.1400  148.0800       9.4        19       942        91
VIS    2025250    183200   17.1200  148.0600       9.1        16       939        95
VIS    2025250    183200   17.1200  148.0200       9.3        19       938        96
VIS    2025250    183200   17.1400  147.9900       9.4        19       938        95
VIS    2025250    183200   17.1400  147.9700       8.9        25       945        93
VIS    2025250    183200   17.1400  147.7700       8.0        17       905        90
VIS    2025250    183200   17.1300  147.7200       9.4        13       847        94
VIS    2025250    183200   17.1200  147.7000       9.3        14       845        98
VIS    2025250    183200   17.1400  147.6800       9.5        12       856        91
VIS    2025250    183200   17.1300  147.6700       9.7        14       856        96
VIS    2025250    183200   17.1300  147.6300       9.7         1       900        92
VIS    2025250    183200   17.1300  147.6100       9.3       360       893        93
VIS    2025250    183200   17.1300  147.6000       9.2         1       872        93
VIS    2025250    183200   17.1300  147.5600       8.9         2       845        93
VIS    2025250    183200   17.1300  147.5000       8.5         1       798        91
VIS    2025250    183200   17.1400  147.4900       7.9         0       805        92
VIS    2025250    183200   17.1200  147.4700       9.2         4       803        91
VIS    2025250    183200   17.1400  147.4400      10.7        10       835        94
VIS    2025250    183200   17.1300  147.1600       8.3         3       795        93
VIS    2025250    183200   17.1300  147.1500       9.1         2       795        97
VIS    2025250    183200   17.1000  148.5700       9.5        21       970        96
VIS    2025250    183200   17.1000  148.5500       9.6        21       941        99
VIS    2025250    183200   17.1000  148.5200       9.7        16       935        99
VIS    2025250    183200   17.1100  148.1300      10.4        16       981        94
VIS    2025250    183200   17.1200  148.1200      10.1        19       981        91
VIS    2025250    183200   17.1100  148.0800       9.6        12       945        95
VIS    2025250    183200   17.1000  148.0700       9.6         9       945        99
VIS    2025250    183200   17.1000  148.0300       9.0        11       938        99
VIS    2025250    183200   17.1100  148.0100       9.2        19       938        96
VIS    2025250    183200   17.1000  147.9800       8.4        16       944        90
VIS    2025250    183200   17.1000  147.7500       9.3         4       882        94
VIS    2025250    183200   17.1000  147.7300       9.1         7       849        97
VIS    2025250    183200   17.1200  147.7000       9.1        17       845        98
VIS    2025250    183200   17.1100  147.6700       9.7        24       847        96
VIS    2025250    183200   17.1100  147.6400       9.9         8       893        94
VIS    2025250    183200   17.1000  147.5900       9.3       360       884        91
VIS    2025250    183200   17.1000  147.5900       9.2       360       872        93
VIS    2025250    183200   17.1000  147.5400       8.1         7       835        91
VIS    2025250    183200   17.1100  147.5000       8.8         5       798        90
VIS    2025250    183200   17.1000  147.4500      10.4         8       803        90
VIS    2025250    183200   17.1100  147.4200      10.8         8       843        95
VIS    2025250    183200   17.0900  147.4000       9.3         3       842        96
VIS    2025250    183200   17.1000  147.1200       6.0        14       748        99
VIS    2025250    183200   17.1000  148.5500       9.5        22       941        99
VIS    2025250    183200   17.0900  148.1200      10.2        12       981        91
VIS    2025250    183200   17.0900  148.1000      10.4        12       967        95
VIS    2025250    183200   17.0800  148.0800       9.9        12       962        98
VIS    2025250    183200   17.0700  148.0500       8.6        12       946        93
VIS    2025250    183200   17.0800  148.0200       9.1        16       940        97
VIS    2025250    183200   17.0700  148.0100       9.1        19       943        92
VIS    2025250    183200   17.0800  147.8700      11.3         6       965        95
VIS    2025250    183200   17.0900  147.7400       9.0         3       852        93
VIS    2025250    183200   17.0800  147.7200       8.4         6       846        96
VIS    2025250    183200   17.0700  147.6900       8.7        11       845        98
VIS    2025250    183200   17.0900  147.6600      10.1        24       847        96
VIS    2025250    183200   17.0900  147.6400      10.1        16       875        95
VIS    2025250    183200   17.0900  147.6000       9.5         2       900        91
VIS    2025250    183200   17.0800  147.5900       9.3         2       904        93
VIS    2025250    183200   17.0700  147.5500       9.2         2       882        94
VIS    2025250    183200   17.0900  147.5500       8.6         5       852        94
VIS    2025250    183200   17.0700  147.5100       9.5         2       865        94
VIS    2025250    183200   17.0800  147.4900       9.5         8       793        90
VIS    2025250    183200   17.0800  147.4300      11.3         7       834        92
VIS    2025250    183200   17.0700  147.4100      10.6         3       839        93
VIS    2025250    183200   17.0900  147.3900       9.3         2       840        95
VIS    2025250    183200   17.0800  147.3800       8.5         2       839        92
VIS    2025250    183200   17.0900  151.7500       7.6        70       999        92
VIS    2025250    183200   17.0900  151.7400       7.9        72       999        94
VIS    2025250    183200   17.0600  148.1200       9.9         7       992        94
VIS    2025250    183200   17.0600  148.1100       9.8         7       989        96
VIS    2025250    183200   17.0700  148.0700       9.3        10       955        98
VIS    2025250    183200   17.0600  148.0500       9.0        13       950        95
VIS    2025250    183200   17.0500  148.0200       9.9        14       947        93
VIS    2025250    183200   17.0500  147.9800       9.9        18       954        97
VIS    2025250    183200   17.0500  147.9600       9.6        18       960        95
VIS    2025250    183200   17.0600  147.8900       9.9         7       963        97
VIS    2025250    183200   17.0700  147.7200       8.7         2       856        91
VIS    2025250    183200   17.0600  147.7200       8.7         3       855        92
VIS    2025250    183200   17.0500  147.6800       9.4        12       853        96
VIS    2025250    183200   17.0500  147.6700       9.9        13       853        99
VIS    2025250    183200   17.0600  147.6400      11.2        28       858        94
VIS    2025250    183200   17.0600  147.6100      10.3        16       898        96
VIS    2025250    183200   17.0500  147.5800       9.8         6       919        93
VIS    2025250    183200   17.0500  147.5700       9.6         2       919        92
VIS    2025250    183200   17.0600  147.5500       9.4         2       882        95
VIS    2025250    183200   17.0600  147.5200       9.5         1       882        94
VIS    2025250    183200   17.0600  147.4100      11.2         5       834        92
VIS    2025250    183200   17.0600  147.4000      10.6         3       839        93
VIS    2025250    183200   17.0400  147.3700       9.6         5       818        92
VIS    2025250    183200   17.0700  151.7700       7.0        67       985        91
VIS    2025250    183200   17.0700  151.7600       7.0        69       985        92
VIS    2025250    183200   17.0500  148.1200       9.7        11       992        96
VIS    2025250    183200   17.0500  148.1000       9.6         8       989        94
VIS    2025250    183200   17.0400  148.0700       9.8         8       972        95
VIS    2025250    183200   17.0300  148.0700       9.8         8       961        96
VIS    2025250    183200   17.0400  147.9600       9.4        16       964        96
VIS    2025250    183200   17.0400  147.8800       9.9         3       965        90
VIS    2025250    183200   17.0300  147.8700      10.0         4       965        91
VIS    2025250    183200   17.0300  147.7900       9.0        11       948        95
VIS    2025250    183200   17.0400  147.7600       8.3         3       921        90
VIS    2025250    183200   17.0200  147.7200       8.5         1       874        90
VIS    2025250    183200   17.0400  147.6900       9.5         2       855        94
VIS    2025250    183200   17.0300  147.6700       9.5         5       858        95
VIS    2025250    183200   17.0300  147.6500       9.9         8       860        97
VIS    2025250    183200   17.0300  147.6200      10.9        15       869        97
VIS    2025250    183200   17.0300  147.5900      10.5        11       898        96
VIS    2025250    183200   17.0400  147.5800       9.9         4       924        93
VIS    2025250    183200   17.0200  147.5600       9.9         3       910        95
VIS    2025250    183200   17.0400  147.5100       9.5         1       893        94
VIS    2025250    183200   17.0300  147.5100       9.6         2       893        94
VIS    2025250    183200   17.0200  147.4700      10.7         8       807        90
VIS    2025250    183200   17.0200  147.4600      10.9         7       805        90
VIS    2025250    183200   17.0400  147.4000      11.2         7       834        93
VIS    2025250    183200   17.0300  147.3900      11.1         8       818        91
VIS    2025250    183200   17.0200  147.3500      10.0         3       818        91
VIS    2025250    183200   17.0500  151.7900       7.5        65       975        90
VIS    2025250    183200   17.0100  148.4600      10.4        22       968        93
VIS    2025250    183200   17.0100  148.4400      10.8        23       971        93
VIS    2025250    183200   17.0100  148.4100      10.2        21       975        94
VIS    2025250    183200   17.0200  148.0600      10.0         7       964        96
VIS    2025250    183200   17.0100  148.0500      10.1         5       964        97
VIS    2025250    183200   17.0100  147.9900       9.8        13       962        98
VIS    2025250    183200   17.0200  147.9800       9.6        14       962        97
VIS    2025250    183200   17.0200  147.8600      10.3         6       964        96
VIS    2025250    183200   17.0000  147.8400      11.6         5       959        92
VIS    2025250    183200   17.0100  147.7700       7.8         6       949        96
VIS    2025250    183200   17.0100  147.7400       8.0         3       921        90
VIS    2025250    183200   17.0100  147.7200       8.4         1       900        90
VIS    2025250    183200   17.0000  147.7100       8.4       359       900        90
VIS    2025250    183200   17.0000  147.6900       8.8         0       872        91
VIS    2025250    183200   17.0000  147.6500       9.0         1       869        93
VIS    2025250    183200   17.0000  147.6400       8.1         5       876        90
VIS    2025250    183200   17.0000  147.6000       7.0        13       885        90
VIS    2025250    183200   17.0200  147.5900       9.9        10       898        97
VIS    2025250    183200   17.0000  147.5500      10.0         2       919        98
VIS    2025250    183200   17.0100  147.5300       9.5         1       902        96
VIS    2025250    183200   17.0000  147.5100       9.2         1       914        96
VIS    2025250    183200   17.0100  147.4900      10.1         6       868        98
VIS    2025250    183200   17.0000  147.4000       9.9         8       818        91
VIS    2025250    183200   17.0000  147.3800      10.8         9       820        91
VIS    2025250    183200   17.0100  147.3700      10.8         7       829        92
VIS    2025250    183200   17.0000  147.3400      10.5         6       832        92
VIS    2025250    183200   16.9900  147.3100       6.2        22       812        90
VIS    2025250    183200   17.0200  151.8100       7.5        60       975        91
VIS    2025250    183200   16.9900  148.4700      10.7        11       951        91
VIS    2025250    183200   17.0000  148.4500      10.6        17       968        93
VIS    2025250    183200   16.9800  148.4200      10.4        22       935        98
VIS    2025250    183200   16.9800  148.4100      10.2        24       935        97
VIS    2025250    183200   16.9800  148.3800      10.0        19       935        98
VIS    2025250    183200   17.0000  148.0500      10.2         1       964        95
VIS    2025250    183200   16.9800  148.0200      10.2       356       973        94
VIS    2025250    183200   16.9900  148.0000      10.3         4       966        97
VIS    2025250    183200   16.9800  147.9900      10.1         6       968        99
VIS    2025250    183200   16.9900  147.9600       9.0        12       974        98
VIS    2025250    183200   16.9800  147.8500      12.4         2       981        93
VIS    2025250    183200   16.9800  147.7600       7.8         3       951        95
VIS    2025250    183200   16.9900  147.7000       8.4       358       900        90
VIS    2025250    183200   16.9900  147.6600       8.7         3       873        90
VIS    2025250    183200   16.9900  147.5600      10.2         1       919        98
VIS    2025250    183200   16.9900  147.5500      10.0         0       919        97
VIS    2025250    183200   16.9800  147.5100       9.3       359       923        95
VIS    2025250    183200   16.9800  147.5000       9.4         1       923        95
VIS    2025250    183200   16.9900  147.4800       9.7         5       873        97
VIS    2025250    183200   16.9800  147.4400       9.1         0       811        90
VIS    2025250    183200   16.9900  147.4200       8.9         3       813        90
VIS    2025250    183200   16.9700  147.3900       9.4         7       818        93
VIS    2025250    183200   16.9700  147.3700      10.0        10       827        95
VIS    2025250    183200   16.9900  147.3600      10.4        10       841        97
VIS    2025250    183200   16.9800  147.3300       9.1        15       841        99
VIS    2025250    183200   16.9700  148.5000      10.0        16       955        99
VIS    2025250    183200   16.9800  148.4700      10.4        11       959        93
VIS    2025250    183200   16.9600  148.4400       9.9        18       934        99
VIS    2025250    183200   16.9600  148.4300       9.9        19       934        99
VIS    2025250    183200   16.9600  148.3900       9.4        25       932        96
VIS    2025250    183200   16.9600  148.0200       9.9       353       980        91
VIS    2025250    183200   16.9600  148.0100       9.8       356       980        92
VIS    2025250    183200   16.9600  147.9600      10.0        12       977        97
VIS    2025250    183200   16.9700  147.8400      10.6         6       981        97
VIS    2025250    183200   16.9500  147.7000       7.7         0       935        91
VIS    2025250    183200   16.9500  147.6700       8.1         3       893        93
VIS    2025250    183200   16.9700  147.6600       8.5         5       876        93
VIS    2025250    183200   16.9600  147.5300       8.9       352       926        91
VIS    2025250    183200   16.9600  147.5200       8.7       351       926        90
VIS    2025250    183200   16.9600  147.4800       9.3         3       919        96
VIS    2025250    183200   16.9500  147.4700       9.4         3       917        96
VIS    2025250    183200   16.9500  147.4300       9.1         2       836        95
VIS    2025250    183200   16.9600  147.4200       8.7         3       811        91
VIS    2025250    183200   16.9700  147.3800       9.7         8       818        93
VIS    2025250    183200   16.9600  147.3800       9.6         9       818        94
VIS    2025250    183200   16.9500  147.3400       9.3         9       839        97
VIS    2025250    183200   16.9500  147.3100       9.4         7       867        96
VIS    2025250    183200   16.9500  147.3000       9.4         7       867        97
VIS    2025250    183200   16.9500  147.2600       9.0        13       806        91
VIS    2025250    183200   16.9500  147.2500       9.0         9       806        93
VIS    2025250    183200   16.9400  148.4000       9.2        23       932        91
VIS    2025250    183200   16.9400  148.3800       9.2        23       932        98
VIS    2025250    183200   16.9500  148.0000       9.6       358       980        95
VIS    2025250    183200   16.9300  147.9800      10.3         2       964        97
VIS    2025250    183200   16.9400  147.9700      10.3         7       964        99
VIS    2025250    183200   16.9300  147.9300      10.2        15       974        93
VIS    2025250    183200   16.9300  147.8300       9.1         6       970       100
VIS    2025250    183200   16.9500  147.8300       9.1         4       970        99
VIS    2025250    183200   16.9300  147.7900       9.3        10       970        98
VIS    2025250    183200   16.9500  147.7800      10.2         5       970        98
VIS    2025250    183200   16.9400  147.7500       9.6         5       980        95
VIS    2025250    183200   16.9300  147.7200       8.4         5       977        93
VIS    2025250    183200   16.9200  147.6900       7.9         4       928        94
VIS    2025250    183200   16.9300  147.6800       8.0         6       893        95
VIS    2025250    183200   16.9200  147.6600       7.9         8       881        94
VIS    2025250    183200   16.9300  147.6200       8.4        14       881        93
VIS    2025250    183200   16.9200  147.5000       8.9       354       926        92
VIS    2025250    183200   16.9200  147.4800       9.4       358       923        95
VIS    2025250    183200   16.9400  147.4600       9.4         2       917        96
VIS    2025250    183200   16.9400  147.4200       9.3         2       836        94
VIS    2025250    183200   16.9300  147.3900       9.3         7       807        92
VIS    2025250    183200   16.9400  147.3700       9.2         8       807        93
VIS    2025250    183200   16.9400  147.3600       9.3         9       820        96
VIS    2025250    183200   16.9400  147.3300       9.3         7       839        96
VIS    2025250    183200   16.9300  147.3100       9.7         2       885        96
VIS    2025250    183200   16.9400  147.2700       9.5         8       831        92
VIS    2025250    183200   16.9400  147.2700       9.4         7       831        92
VIS    2025250    183200   16.9200  147.2400       8.9         2       806        93
VIS    2025250    183200   16.9300  148.4300       9.1        19       932        96
VIS    2025250    183200   16.9100  148.4000       9.3        16       950        95
VIS    2025250    183200   16.9100  147.9800      10.6         2       964        98
VIS    2025250    183200   16.9100  147.9600      10.5         5       964        99
VIS    2025250    183200   16.9100  147.9300      10.3        13       966        96
VIS    2025250    183200   16.9200  147.9200      10.3        14       974        93
VIS    2025250    183200   16.9000  147.8900      10.7        11       968        97
VIS    2025250    183200   16.9200  147.8800      10.7        10       982        91
VIS    2025250    183200   16.9100  147.8300      10.0         8       970        99
VIS    2025250    183200   16.9000  147.8100       8.9        10       962        98
VIS    2025250    183200   16.9000  147.8000       8.8        11       962        97
VIS    2025250    183200   16.9100  147.7700       8.9        13       962        94
VIS    2025250    183200   16.9100  147.7500       8.9        13       964        95
VIS    2025250    183200   16.9200  147.7100       8.6         3       965        94
VIS    2025250    183200   16.9200  147.6900       8.1         3       935        93
VIS    2025250    183200   16.9200  147.6700       7.6         4       898        91
VIS    2025250    183200   16.9100  147.6100       8.2        10       926        91
VIS    2025250    183200   16.9000  147.5500       9.6         6       954        95
VIS    2025250    183200   16.9000  147.5000       8.9       350       936        90
VIS    2025250    183200   16.9200  147.4800       9.6       358       923        95
VIS    2025250    183200   16.9000  147.4500       9.6       355       923        93
VIS    2025250    183200   16.9200  147.4400       9.5       358       872        94
VIS    2025250    183200   16.9100  147.4000       9.5         4       820        93
VIS    2025250    183200   16.9200  147.3700       8.9         7       820        95
VIS    2025250    183200   16.9000  147.3400       9.1         0       841        94
VIS    2025250    183200   16.9000  147.3400       9.2       359       841        93
VIS    2025250    183200   16.9100  147.3100       9.5         0       880        96
VIS    2025250    183200   16.9200  147.2900       9.8       359       924        95
VIS    2025250    183200   16.9100  147.2700       9.1       360       954        92
VIS    2025250    183200   16.9200  147.2300       9.0         3       806        94
VIS    2025250    183200   16.9100  147.2100       9.5         5       798        95
VIS    2025250    183200   16.9000  147.1900       9.4         5       794        97
VIS    2025250    183200   16.9000  148.4100       9.4        15       952        95
VIS    2025250    183200   16.9000  148.3900       9.6        12       950        97
VIS    2025250    183200   16.9000  147.9800      10.5         3       970        98
VIS    2025250    183200   16.8800  147.9700       9.8         5       970        97
VIS    2025250    183200   16.8800  147.9400      10.2         6       970        98
VIS    2025250    183200   16.8900  147.9100      10.8         8       964        98
VIS    2025250    183200   16.8800  147.8900      10.5         8       967        97
VIS    2025250    183200   16.8800  147.8500      10.4         6       973        96
VIS    2025250    183200   16.8800  147.8300      10.3         4       973        96
VIS    2025250    183200   16.9000  147.8000       8.7        11       962        97
VIS    2025250    183200   16.8800  147.7700       8.2        15       956        92
VIS    2025250    183200   16.8800  147.7400       8.4        17       961        90
VIS    2025250    183200   16.8800  147.6900       7.9         9       980        93
VIS    2025250    183200   16.8900  147.6100       7.7         6       930        92
VIS    2025250    183200   16.8800  147.5700       8.9         3       961        93
VIS    2025250    183200   16.8900  147.5500       9.7         3       954        96
VIS    2025250    183200   16.8800  147.5300       8.8       354       941        91
VIS    2025250    183200   16.8900  147.4900       9.0       351       936        90
VIS    2025250    183200   16.8800  147.4500       9.5       354       936        92
VIS    2025250    183200   16.8700  147.4200       9.6       356       944        95
VIS    2025250    183200   16.8700  147.4000       9.5       357       896        94
VIS    2025250    183200   16.8700  147.3800       9.5       354       875        90
VIS    2025250    183200   16.8700  147.3600       9.6       354       875        90
VIS    2025250    183200   16.8800  147.3300       9.4       357       875        94
VIS    2025250    183200   16.8800  147.3200       9.3       357       875        93
VIS    2025250    183200   16.8800  147.2900       8.8       360       875        94
VIS    2025250    183200   16.8800  147.2600       8.6         1       895        93
VIS    2025250    183200   16.8800  147.2300       9.0       358       972        94
VIS    2025250    183200   16.8900  147.2000       9.7         4       835        98
VIS    2025250    183200   16.8800  147.1800       9.4         2       817        99
VIS    2025250    183200   16.8700  147.1600       9.0       357       819        96
VIS    2025250    183200   16.8800  148.3900       9.5        11       953        96
VIS    2025250    183200   16.8700  148.3100       8.3        11       980        98
VIS    2025250    183200   16.8600  148.3100       8.8        11       965       100
VIS    2025250    183200   16.8700  147.9600       9.8         5       970        97
VIS    2025250    183200   16.8600  147.9300      10.1         5       972        99
VIS    2025250    183200   16.8700  147.9000      10.6         6       965        96
VIS    2025250    183200   16.8700  147.8700      10.2         6       968        96
VIS    2025250    183200   16.8700  147.8400      10.2         4       969        95
VIS    2025250    183200   16.8700  147.8200      10.0         4       973        96
VIS    2025250    183200   16.8500  147.8000       9.2         6       968        98
VIS    2025250    183200   16.8500  147.7900       9.1         8       961        99
VIS    2025250    183200   16.8600  147.7600       8.9        12       955        98
VIS    2025250    183200   16.8700  147.7200       8.5        19       965        90
VIS    2025250    183200   16.8700  147.7100       8.3        17       972        90
VIS    2025250    183200   16.8600  147.5600       8.4         1       968        90
VIS    2025250    183200   16.8500  147.4600       9.6       354       951        92
VIS    2025250    183200   16.8600  147.4300       9.8       355       948        93
VIS    2025250    183200   16.8700  147.4000       9.7       356       944        94
VIS    2025250    183200   16.8600  147.3800       9.7       353       946        91
VIS    2025250    183200   16.8600  147.3600       9.8       352       946        91
VIS    2025250    183200   16.8600  147.3300       9.6       354       938        92
VIS    2025250    183200   16.8500  147.3100       9.2       355       933        91
VIS    2025250    183200   16.8500  147.3000       8.8       356       880        91
VIS    2025250    183200   16.8700  147.2600       8.6         1       885        95
VIS    2025250    183200   16.8500  147.2400       8.6       358       895        92
VIS    2025250    183200   16.8600  147.2200       8.7       357       895        92
VIS    2025250    183200   16.8500  147.1900       8.6       355       873        91
VIS    2025250    183200   16.8700  147.1600       9.1       357       856        96
VIS    2025250    183200   16.8700  147.1500       8.9       356       835        96
VIS    2025250    183200   16.8700  151.5300       7.4        62      1000        90
VIS    2025250    183200   16.8300  148.3400      10.0         8       970        98
VIS    2025250    183200   16.8400  148.3000       8.7        14       965        99
VIS    2025250    183200   16.8300  148.2900       8.7        14       965        99
VIS    2025250    183200   16.8500  147.9500       9.9         3       988        97
VIS    2025250    183200   16.8300  147.8800       9.7         7       953        98
VIS    2025250    183200   16.8300  147.8400       9.1         5       957        91
VIS    2025250    183200   16.8500  147.8400       9.6         3       968        90
VIS    2025250    183200   16.8300  147.7900       9.6         5       955        98
VIS    2025250    183200   16.8300  147.7700       9.6         4       941        99
VIS    2025250    183200   16.8300  147.7600       9.5         5       941        99
VIS    2025250    183200   16.8400  147.7400       9.1        11       956        95
VIS    2025250    183200   16.8500  147.7100       8.2        16       961        92
VIS    2025250    183200   16.8400  147.6700       8.1         6       994        95
VIS    2025250    183200   16.8400  147.4500       9.7       354       951        92
VIS    2025250    183200   16.8400  147.4400      10.2       355       956        91
VIS    2025250    183200   16.8400  147.4100      10.5       355       963        92
VIS    2025250    183200   16.8200  147.3900      10.5       356       979        96
VIS    2025250    183200   16.8300  147.3600      10.0       353       990        96
VIS    2025250    183200   16.8300  147.3400       9.9       354       987        95
VIS    2025250    183200   16.8400  147.3200       9.5       354       962        92
VIS    2025250    183200   16.8200  147.3000       9.3       356       953        93
VIS    2025250    183200   16.8400  147.2600       8.5         0       851        94
VIS    2025250    183200   16.8300  147.2500       8.4         0       895        93
VIS    2025250    183200   16.8300  147.2100       8.1       353       846        92
VIS    2025250    183200   16.8300  147.1500       9.1       357       856        94
VIS    2025250    183200   16.8200  147.1200      10.1         2       856        98
VIS    2025250    183200   16.8300  149.8600       9.0        19       990        90
VIS    2025250    183200   16.8300  148.3700      10.1         5       975        96
VIS    2025250    183200   16.8100  148.3400       9.2        11       970        99
VIS    2025250    183200   16.8200  148.3000       8.2        16       959        99
VIS    2025250    183200   16.8100  148.2800       9.6        13       926        97
VIS    2025250    183200   16.8100  148.2600      10.2        10       926        96
VIS    2025250    183200   16.8200  147.8700       9.5         7       953        97
VIS    2025250    183200   16.8100  147.8500       9.4         8       958        92
VIS    2025250    183200   16.8000  147.8300       9.9         9       963        94
VIS    2025250    183200   16.8200  147.7900       9.7         3       946        96
VIS    2025250    183200   16.8200  147.7600       9.5         3       941        96
VIS    2025250    183200   16.8200  147.7600       9.3         3       937        95
VIS    2025250    183200   16.8000  147.7100       9.0         7       946        95
VIS    2025250    183200   16.8200  147.6900       8.8         8       976        94
VIS    2025250    183200   16.8000  147.4200       9.2       355       943        91
VIS    2025250    183200   16.8200  147.4100      10.5       354       963        94
VIS    2025250    183200   16.8200  147.3800      10.5       357       975        98
VIS    2025250    183200   16.8100  147.3600      10.1       358       975        98
VIS    2025250    183200   16.8000  147.3200       9.8       358       975        97
VIS    2025250    183200   16.8200  147.3000       9.5       356       961        94
VIS    2025250    183200   16.8000  147.2700       9.4         2       919        94
VIS    2025250    183200   16.8100  147.2700       9.1         2       919        92
VIS    2025250    183200   16.8100  147.2200       8.3       356       851        91
VIS    2025250    183200   16.8000  147.1900       8.2       354       809        93
VIS    2025250    183200   16.8100  147.1500       8.7       355       790        91
VIS    2025250    183200   16.8100  147.1400       9.3       359       790        93
VIS    2025250    183200   16.8200  147.1100      10.1         2       856        97
VIS    2025250    183200   16.7900  148.4000       8.9         2       971        95
VIS    2025250    183200   16.8100  148.3600      10.6         6       970        98
VIS    2025250    183200   16.7900  148.3200       8.7        12       953        99
VIS    2025250    183200   16.7900  148.3200       8.4        14       953       100
VIS    2025250    183200   16.8000  148.2800       9.1        14       925        98
VIS    2025250    183200   16.7900  147.8100      10.0         6       963        95
VIS    2025250    183200   16.7900  147.7800      10.3         1       962        93
VIS    2025250    183200   16.8000  147.7700       9.7         0       946        94
VIS    2025250    183200   16.7800  147.7300       8.9         1       940        95
VIS    2025250    183200   16.8000  147.7100       9.1         7       946        95
VIS    2025250    183200   16.7900  147.7000       9.3         7       960        96
VIS    2025250    183200   16.7900  147.6600       9.7         7       984        95
VIS    2025250    183200   16.8000  147.5100       9.2         2       988        98
VIS    2025250    183200   16.7900  147.5100       9.3         1       988        98
VIS    2025250    183200   16.7800  147.4700       9.6       359       990        96
VIS    2025250    183200   16.7900  147.4200       9.3       356       944        93
VIS    2025250    183200   16.7800  147.4000      10.4       355       941        95
VIS    2025250    183200   16.7900  147.3700      10.1       358       940        94
VIS    2025250    183200   16.7900  147.3400       9.7       359       940        96
VIS    2025250    183200   16.7800  147.3200       9.5       357       940        96
VIS    2025250    183200   16.7900  147.3100       9.6       358       961        97
VIS    2025250    183200   16.7900  147.2700       9.5         3       919        94
VIS    2025250    183200   16.7900  147.2500       9.3         2       889        92
VIS    2025250    183200   16.7900  147.2200       8.7       358       864        92
VIS    2025250    183200   16.7900  147.1900       8.6       356       834        95
VIS    2025250    183200   16.7900  147.1800       8.3       354       809        94
VIS    2025250    183200   16.7700  147.1600       8.2       352       787        94
VIS    2025250    183200   16.7800  147.1200       8.3       358       782        95
VIS    2025250    183200   16.7900  147.1000       8.6         1       790        92
VIS    2025250    183200   16.7900  147.0800       8.4         2       797        90
VIS    2025250    183200   16.7900  147.0400       6.5         1       767        91
VIS    2025250    183200   16.7700  148.3300       9.4         7       953        93
VIS    2025250    183200   16.7800  148.3100       8.9        10       947        97
VIS    2025250    183200   16.7800  148.2800       9.3         9       910        92
VIS    2025250    183200   16.7800  148.2600       9.9         6       918        92
VIS    2025250    183200   16.7700  148.2500       9.9         5       918        92
VIS    2025250    183200   16.7700  147.8200       9.5         4       963        97
VIS    2025250    183200   16.7600  147.7900      10.4       359       962        97
VIS    2025250    183200   16.7700  147.7600      10.1         1       956        95
VIS    2025250    183200   16.7600  147.7300       8.9       360       940        95
VIS    2025250    183200   16.7700  147.7100       8.8         3       940        94
VIS    2025250    183200   16.7700  147.6900       9.2         5       967        96
VIS    2025250    183200   16.7600  147.6700      10.1         3       985        99
VIS    2025250    183200   16.7500  147.6500      10.4         3       985        99
VIS    2025250    183200   16.7700  147.5400       8.7       355       986        96
VIS    2025250    183200   16.7600  147.5200       8.8       352       980        94
VIS    2025250    183200   16.7600  147.4800      10.0         0       979        96
VIS    2025250    183200   16.7600  147.4800      10.1         1       979        96
VIS    2025250    183200   16.7500  147.4400       9.4       355       976        93
VIS    2025250    183200   16.7600  147.4300       9.5       354       976        92
VIS    2025250    183200   16.7600  147.4000      10.4       354       944        94
VIS    2025250    183200   16.7600  147.3700      10.0       356       930        94
VIS    2025250    183200   16.7600  147.3400       9.2       356       915        92
VIS    2025250    183200   16.7600  147.3300       9.1       356       900        92
VIS    2025250    183200   16.7500  147.3000       9.2       356       900        94
VIS    2025250    183200   16.7500  147.2800       9.6       359       913        96
VIS    2025250    183200   16.7600  147.2500       9.5         0       873        95
VIS    2025250    183200   16.7500  147.2300       8.9       358       869        95
VIS    2025250    183200   16.7700  147.2100       9.0       360       846        93
VIS    2025250    183200   16.7600  147.1700       8.8       357       790        94
VIS    2025250    183200   16.7500  147.1600       8.7       357       787        95
VIS    2025250    183200   16.7600  147.1200       7.9       355       787        95
VIS    2025250    183200   16.7600  147.1200       7.8       356       787        93
VIS    2025250    183200   16.7500  147.0000       4.6       360       739        90
VIS    2025250    183200   16.7700  149.7900       8.2        24       950        90
VIS    2025250    183200   16.7400  148.4700       8.6         3       978       100
VIS    2025250    183200   16.7400  148.3700       9.2         5       968        91
VIS    2025250    183200   16.7500  148.3000       9.6         3       934        91
VIS    2025250    183200   16.7400  148.3000       9.7         3       934        90
VIS    2025250    183200   16.7400  148.2500       9.2         8       918        93
VIS    2025250    183200   16.7500  148.2300       9.4         8       932        94
VIS    2025250    183200   16.7500  148.2200       9.5         8       938        95
VIS    2025250    183200   16.7500  148.2000       9.8        11       978        99
VIS    2025250    183200   16.7500  147.7800      10.5       359       962        98
VIS    2025250    183200   16.7300  147.7700      10.6       358       954        94
VIS    2025250    183200   16.7400  147.7300       9.2       356       935        94
VIS    2025250    183200   16.7500  147.7200       9.1       358       917        93
VIS    2025250    183200   16.7300  147.6800      10.5         1       918        98
VIS    2025250    183200   16.7400  147.6600      10.8         2       976       100
VIS    2025250    183200   16.7300  147.6500      10.7         3       976        97
VIS    2025250    183200   16.7400  147.5200       8.3       350       978        93
VIS    2025250    183200   16.7400  147.5000       8.9       357       972        97
VIS    2025250    183200   16.7500  147.4700       9.9         1       973        96
VIS    2025250    183200   16.7400  147.4600       9.6         1       973        95
VIS    2025250    183200   16.7400  147.4200       9.6       352       963        90
VIS    2025250    183200   16.7300  147.3800      10.0       353       930        94
VIS    2025250    183200   16.7400  147.3700       9.7       354       930        92
VIS    2025250    183200   16.7500  147.3300       8.9       355       900        95
VIS    2025250    183200   16.7500  147.3000       9.1       355       900        93
VIS    2025250    183200   16.7400  147.3000       9.1       355       899        97
VIS    2025250    183200   16.7400  147.2500       9.4       359       910        96
VIS    2025250    183200   16.7300  147.2500       9.3       358       905        99
VIS    2025250    183200   16.7300  147.2000       8.8       357       869        99
VIS    2025250    183200   16.7300  147.2000       8.6       357       825        99
VIS    2025250    183200   16.7400  147.1100       8.3       356       787        94
VIS    2025250    183200   16.7200  148.3300       9.3       360       966        94
VIS    2025250    183200   16.7200  148.2800      10.1         3       927        90
VIS    2025250    183200   16.7100  148.2600       9.4         7       932        92
VIS    2025250    183200   16.7300  148.2500       9.2         8       918        93
VIS    2025250    183200   16.7300  148.2000      10.1         9       944        91
VIS    2025250    183200   16.7300  147.7700      10.6       358       954        94
VIS    2025250    183200   16.7300  147.7700      10.5       358       954        94
VIS    2025250    183200   16.7200  147.7300       8.7       356       953        96
VIS    2025250    183200   16.7100  147.7100       9.0       355       935        93
VIS    2025250    183200   16.7300  147.6800      10.9         1       932        98
VIS    2025250    183200   16.7100  147.6700      10.7         2       933        99
VIS    2025250    183200   16.7200  147.6500      11.2         3       970        97
VIS    2025250    183200   16.7100  147.6200      10.8         2       976        98
VIS    2025250    183200   16.7100  147.6000       9.5       359       980        99
VIS    2025250    183200   16.7200  147.5100       8.5       356       972        96
VIS    2025250    183200   16.7200  147.5000       8.6       357       972        96
VIS    2025250    183200   16.7200  147.4800       9.0       360       965        96
VIS    2025250    183200   16.7000  147.4300       9.0       359       956        95
VIS    2025250    183200   16.7000  147.4300       9.0       359       954        94
VIS    2025250    183200   16.7200  147.3900       9.6       352       935        93
VIS    2025250    183200   16.7000  147.3600       9.5       351       929        94
VIS    2025250    183200   16.7200  147.3400       9.5       354       915        96
VIS    2025250    183200   16.7100  147.3200       9.3       355       904        96
VIS    2025250    183200   16.7000  147.2900       9.4       354       896        95
VIS    2025250    183200   16.7200  147.2700       9.3       356       899        97
VIS    2025250    183200   16.7200  147.2400       9.3       357       899        98
VIS    2025250    183200   16.7000  147.2200       9.6       357       894        99
VIS    2025250    183200   16.7100  147.2000       9.2       357       880        99
VIS    2025250    183200   16.7100  147.1700       8.5       355       821        96
VIS    2025250    183200   16.7000  147.0200       8.4       353       806        91
VIS    2025250    183200   16.7000  147.0100       8.4       353       807        92
VIS    2025250    183200   16.7000  148.4300       9.3         3       978        99
VIS    2025250    183200   16.6900  148.3900       9.0         2       965        94
VIS    2025250    183200   16.6900  148.3800       9.1         0       965        96
VIS    2025250    183200   16.6900  148.3400       9.3         2       966        96
VIS    2025250    183200   16.6900  148.3300       9.5         1       953        96
VIS    2025250    183200   16.7000  148.2400       9.3         7       936        96
VIS    2025250    183200   16.7000  148.2400       9.5         7       938        96
VIS    2025250    183200   16.6900  148.2000       9.8         7       937        94
VIS    2025250    183200   16.6900  148.1700       9.4         5       957        92
VIS    2025250    183200   16.7000  147.7700       9.6       358       962        91
VIS    2025250    183200   16.7000  147.7400       8.9       359       962        94
VIS    2025250    183200   16.7000  147.7300       8.5       358       967        93
VIS    2025250    183200   16.6800  147.7000       8.1       359       938        92
VIS    2025250    183200   16.7000  147.6600      10.2         1       933        97
VIS    2025250    183200   16.6900  147.6600       9.7         1       879        96
VIS    2025250    183200   16.6900  147.6300      10.9         2       944        98
VIS    2025250    183200   16.6900  147.6100       9.9         0       956        99
VIS    2025250    183200   16.6900  147.5800       8.8       358       980        98
VIS    2025250    183200   16.6800  147.5400       9.7         2       991        96
VIS    2025250    183200   16.6800  147.4400       8.7       355       964        93
VIS    2025250    183200   16.7000  147.4300       8.9       358       954        95
VIS    2025250    183200   16.6900  147.4100       8.7       354       956        91
VIS    2025250    183200   16.6900  147.3800       8.7       350       937        90
VIS    2025250    183200   16.6900  147.3600       8.9       351       930        93
VIS    2025250    183200   16.6800  147.3200       9.2       354       923        94
VIS    2025250    183200   16.6800  147.3100       9.5       355       923        96
VIS    2025250    183200   16.7000  147.2900       9.5       354       896        96
VIS    2025250    183200   16.6800  147.2600       9.8       353       891        95
VIS    2025250    183200   16.6800  147.2500       9.7       354       877        96
VIS    2025250    183200   16.7000  147.2100       9.6       357       881        99
VIS    2025250    183200   16.6800  147.1800       9.0       356       845        95
VIS    2025250    183200   16.7000  147.1700       8.3       353       825        96
VIS    2025250    183200   16.6800  147.0400       9.0       354       810        93
VIS    2025250    183200   16.6900  147.0200       9.0       354       807        93
VIS    2025250    183200   16.6800  147.0000       9.2       356       821        93
VIS    2025250    183200   16.6700  148.4000       9.0         2       965        90
VIS    2025250    183200   16.6800  148.3800       9.3       359       965        95
VIS    2025250    183200   16.6700  148.3600       9.5         2       953        95
VIS    2025250    183200   16.6600  148.3200       9.3         2       950        96
VIS    2025250    183200   16.6800  148.3000       9.8       359       934        92
VIS    2025250    183200   16.6600  148.2700       9.2       360       927        92
VIS    2025250    183200   16.6800  148.2400       9.3         5       938        95
VIS    2025250    183200   16.6600  148.1900       9.5         4       958        94
VIS    2025250    183200   16.6700  148.1900       9.7         4       957        94
VIS    2025250    183200   16.6600  147.7200       8.8         4       980        94
VIS    2025250    183200   16.6800  147.7000       8.1       360       938        93
VIS    2025250    183200   16.6600  147.6900       8.2         3       873        97
VIS    2025250    183200   16.6700  147.6400       9.6         1       879        95
VIS    2025250    183200   16.6800  147.6200      10.7         2       937        98
VIS    2025250    183200   16.6700  147.6000      10.1         3       939        98
VIS    2025250    183200   16.6600  147.5800       9.3         3       944        97
VIS    2025250    183200   16.6700  147.5700       9.2         2       979        97
VIS    2025250    183200   16.6700  147.5400       9.9         3       985        98
VIS    2025250    183200   16.6700  147.4500       8.7       356       966        93
VIS    2025250    183200   16.6700  147.4000       8.6       348       956        93
VIS    2025250    183200   16.6600  147.3800       8.6       351       949        92
VIS    2025250    183200   16.6600  147.3600       8.5       351       930        90
VIS    2025250    183200   16.6700  147.3200       9.2       353       923        90
VIS    2025250    183200   16.6600  147.3000       9.5       354       924        90
VIS    2025250    183200   16.6600  147.2600      10.0       353       913        95
VIS    2025250    183200   16.6700  147.2500       9.7       354       877        95
VIS    2025250    183200   16.6500  147.2100       9.8       354       918        98
VIS    2025250    183200   16.6600  147.2000       9.4       355       881        98
VIS    2025250    183200   16.6700  147.1800       8.9       355       845        95
VIS    2025250    183200   16.6600  147.1500       8.2       351       835        97
VIS    2025250    183200   16.6500  147.0600       7.5       359       850        93
VIS    2025250    183200   16.6700  147.0400       9.1       355       821        93
VIS    2025250    183200   16.6700  147.0300       9.2       355       821        93
VIS    2025250    183200   16.6700  147.0000       9.1       356       810        92
VIS    2025250    183200   16.6600  146.9800       8.5       356       800        93
VIS    2025250    183200   16.6500  146.8300       7.0       351       802        91
VIS    2025250    183200   16.6400  148.4000       9.2         5       978        96
VIS    2025250    183200   16.6400  148.3800       9.2         4       978        98
VIS    2025250    183200   16.6600  148.3600       9.3         4       953        97
VIS    2025250    183200   16.6400  148.3400       9.2         4       950        97
VIS    2025250    183200   16.6500  148.2900       9.4         3       937        95
VIS    2025250    183200   16.6500  148.2600       8.9         4       931        94
VIS    2025250    183200   16.6400  148.2400       8.6         7       975        94
VIS    2025250    183200   16.6600  148.2000       9.4         5       971        92
VIS    2025250    183200   16.6600  148.1900       9.6         3       978        90
VIS    2025250    183200   16.6600  148.1300       9.8         5       983        90
VIS    2025250    183200   16.6300  147.7300       9.3         4       986        96
VIS    2025250    183200   16.6500  147.7100       9.0         5       972        96
VIS    2025250    183200   16.6400  147.6800       8.5         2       896        97
VIS    2025250    183200   16.6500  147.6700       8.1         0       876        96
VIS    2025250    183200   16.6500  147.6400       9.3       359       876        95
VIS    2025250    183200   16.6300  147.6000       9.5         3       874        98
VIS    2025250    183200   16.6500  147.5700       9.1         4       939        97
VIS    2025250    183200   16.6300  147.5600       9.2         5       939        98
VIS    2025250    183200   16.6300  147.5400       9.5         5       965        97
VIS    2025250    183200   16.6400  147.4000       9.6       351       972        94
VIS    2025250    183200   16.6300  147.3900       9.6       354       972        97
VIS    2025250    183200   16.6400  147.2700       9.9       352       950        90
VIS    2025250    183200   16.6300  147.2300      10.3       351       959        93
VIS    2025250    183200   16.6500  147.2100       9.9       355       918        98
VIS    2025250    183200   16.6500  147.2000       9.4       356       892        97
VIS    2025250    183200   16.6400  147.1700       9.3       355       891        97
VIS    2025250    183200   16.6500  147.1500       8.7       352       844        98
VIS    2025250    183200   16.6300  147.0600       7.9       360       850        95
VIS    2025250    183200   16.6300  147.0600       8.3       359       850        95
VIS    2025250    183200   16.6500  147.0300       9.4       356       852        96
VIS    2025250    183200   16.6300  147.0000       9.4       355       815        95
VIS    2025250    183200   16.6300  146.9700       8.6       354       819        94
VIS    2025250    183200   16.6400  148.4300       9.4         1       978        98
VIS    2025250    183200   16.6400  148.4100       9.3         4       978        94
VIS    2025250    183200   16.6300  148.3700       9.3         4       978        98
VIS    2025250    183200   16.6300  148.3500       9.2         4       950        97
VIS    2025250    183200   16.6200  148.3400       9.1         4       942        96
VIS    2025250    183200   16.6300  148.2600       9.3         6       936        93
VIS    2025250    183200   16.6300  148.2100       9.2         6       978        90
VIS    2025250    183200   16.6300  148.2000       9.6         4       978        90
VIS    2025250    183200   16.6200  148.1700       9.9         1       986        92
VIS    2025250    183200   16.6200  148.1400       9.1       358       964        98
VIS    2025250    183200   16.6300  147.7300       9.2         4       986        95
VIS    2025250    183200   16.6300  147.7200       9.6         4       986        96
VIS    2025250    183200   16.6300  147.6900       9.5         3       957        96
VIS    2025250    183200   16.6100  147.6600       9.7         1       961        99
VIS    2025250    183200   16.6100  147.6400       9.9         2       889       100
VIS    2025250    183200   16.6100  147.6200       9.9         1       883        98
VIS    2025250    183200   16.6100  147.6100       9.4         0       877        95
VIS    2025250    183200   16.6100  147.5700       9.0         2       883        98
VIS    2025250    183200   16.6300  147.5400       9.5         6       965        98
VIS    2025250    183200   16.6100  147.5100       9.4         4       976        98
VIS    2025250    183200   16.6300  147.3600       8.6       356       882        94
VIS    2025250    183200   16.6200  147.2300      10.2       349       963        92
VIS    2025250    183200   16.6200  147.2000       9.9       353       956        94
VIS    2025250    183200   16.6100  147.1800       9.9       353       956        97
VIS    2025250    183200   16.6100  147.1600       9.8       353       928        99
VIS    2025250    183200   16.6000  147.1300       8.5       349       928        95
VIS    2025250    183200   16.6200  147.0600       8.3       360       850        95
VIS    2025250    183200   16.6000  147.0400       9.1       355       909        96
VIS    2025250    183200   16.6200  147.0000       9.2       353       912        98
VIS    2025250    183200   16.6200  147.0000       9.3       354       819        96
VIS    2025250    183200   16.6200  146.9700       8.8       353       819        95
VIS    2025250    183200   16.6200  146.9400       8.2       352       819        90
VIS    2025250    183200   16.6100  146.9100       8.7       348       819        93
VIS    2025250    183200   16.6100  146.9000       8.7       347       811        93
VIS    2025250    183200   16.6200  146.8300       7.9       350       803        90
VIS    2025250    183200   16.6200  146.8100       8.3       351       807        93
VIS    2025250    183200   16.6100  146.7300       6.5       351       786        92
VIS    2025250    183200   16.6000  148.4100       9.4         3       978        94
VIS    2025250    183200   16.6100  148.4000       9.4         3       978        96
VIS    2025250    183200   16.5900  148.3600       9.1         3       955        94
VIS    2025250    183200   16.6000  148.3400       9.1         3       942        94
VIS    2025250    183200   16.6100  148.3200       9.2         4       940        95
VIS    2025250    183200   16.6000  148.3100       9.5         4       927        90
VIS    2025250    183200   16.5900  148.2800       9.9         6       926        90
VIS    2025250    183200   16.6000  148.2400       9.5        10       974        95
VIS    2025250    183200   16.6000  148.2300       9.8        10       974        90
VIS    2025250    183200   16.6000  148.2100       9.4         7       950        93
VIS    2025250    183200   16.6100  148.1900       9.7         4       950        95
VIS    2025250    183200   16.5900  148.1400       9.0         1       950        99
VIS    2025250    183200   16.5900  148.1300       8.6         2       950        99
VIS    2025250    183200   16.6000  147.7300       9.8         2       986        92
VIS    2025250    183200   16.5800  147.7000       9.9         3       983        92
VIS    2025250    183200   16.5800  147.6900       9.8         2       983        92
VIS    2025250    183200   16.6000  147.6500       9.9         1       962        99
VIS    2025250    183200   16.5900  147.6400      10.3         2       967        98
VIS    2025250    183200   16.6000  147.6100       9.7         0       883        97
VIS    2025250    183200   16.6000  147.5900       9.2       359       877        95
VIS    2025250    183200   16.5900  147.5700       9.4       360       883        98
VIS    2025250    183200   16.5900  147.5400       9.2         4       939        98
VIS    2025250    183200   16.5800  147.5200       9.5         4       951        98
VIS    2025250    183200   16.6000  147.5000       9.3         3       976        98
VIS    2025250    183200   16.5800  147.4500       8.9       360       984        97
VIS    2025250    183200   16.6000  147.3800       8.5       358       893        96
VIS    2025250    183200   16.6000  147.3600       7.5       355       875        94
VIS    2025250    183200   16.5900  147.3300       7.0         1       875        90
VIS    2025250    183200   16.6000  147.2800       7.6       359       939        90
VIS    2025250    183200   16.5800  147.2300      10.2       355       993        97
VIS    2025250    183200   16.6000  147.2100       9.9       350       983        90
VIS    2025250    183200   16.5900  147.1900       9.9       351       970        94
VIS    2025250    183200   16.5900  147.1700       9.8       352       961        95
VIS    2025250    183200   16.6000  147.1400       8.9       350       933        96
VIS    2025250    183200   16.5900  147.1300       8.4       347       941        94
VIS    2025250    183200   16.5900  147.0900       7.8       350       936        92
VIS    2025250    183200   16.5800  147.0800       8.1       350       946        94
VIS    2025250    183200   16.5800  147.0600       9.2       353       870        96
VIS    2025250    183200   16.5800  147.0200       9.1       349       909        92
VIS    2025250    183200   16.5900  147.0000       8.5       350       915        93
VIS    2025250    183200   16.5900  146.9900       8.2       349       915        92
VIS    2025250    183200   16.5800  146.9600       8.3       349       922        94
VIS    2025250    183200   16.5800  146.9300       8.9       348       922        93
VIS    2025250    183200   16.5800  146.9100       8.9       348       920        95
VIS    2025250    183200   16.5800  146.8900       9.0       348       920        91
VIS    2025250    183200   16.5900  146.8100       9.0       352       819        92
VIS    2025250    183200   16.5800  146.7700       9.0       353       820        91
VIS    2025250    183200   16.5800  146.7700       9.0       352       828        92
VIS    2025250    183200   16.5800  146.7300       8.5       346       828        97
VIS    2025250    183200   16.5800  146.7100       8.0       347       838       100
VIS    2025250    183200   16.5800  146.6900       7.3       346       824        99
VIS    2025250    183200   16.6100  151.4900       5.9        55       995        92
VIS    2025250    183200   16.5900  148.3900       9.4         3       978        94
VIS    2025250    183200   16.5800  148.3700       9.1         2       960        92
VIS    2025250    183200   16.5700  148.2600      10.8         8       908        90
VIS    2025250    183200   16.5800  148.2200      10.1         7       951        93
VIS    2025250    183200   16.5700  148.2000       9.5         6       934        94
VIS    2025250    183200   16.5700  148.1900       9.5         6       931        94
VIS    2025250    183200   16.5600  148.1700       9.4         6       930        96
VIS    2025250    183200   16.5700  148.1400       9.3         5       936        98
VIS    2025250    183200   16.5700  148.1000       8.4         6       959        96
VIS    2025250    183200   16.5600  148.0900       8.5         5       961        94
VIS    2025250    183200   16.5800  147.6900       9.8         2       986        93
VIS    2025250    183200   16.5600  147.6500       9.6         0       974        95
VIS    2025250    183200   16.5600  147.6300       9.9         0       967        94
VIS    2025250    183200   16.5600  147.6000       9.9       360       884        96
VIS    2025250    183200   16.5700  147.5900       9.9       360       880        96
VIS    2025250    183200   16.5700  147.5600       9.6       359       873        97
VIS    2025250    183200   16.5600  147.5200       9.7         1       926        98
VIS    2025250    183200   16.5800  147.5200       9.8         3       960        98
VIS    2025250    183200   16.5700  147.5000       9.9         3       975        98
VIS    2025250    183200   16.5700  147.4700       9.8         2       983        99
VIS    2025250    183200   16.5800  147.4400       9.2       358       984        97
VIS    2025250    183200   16.5800  147.4000       9.1       353       979        96
VIS    2025250    183200   16.5700  147.3500       8.9       354       965        96
VIS    2025250    183200   16.5700  147.3500       8.8       355       965        97
VIS    2025250    183200   16.5700  147.3100       7.4         3       934        90
VIS    2025250    183200   16.5600  147.2700       8.3       359       939        98
VIS    2025250    183200   16.5600  147.2400       9.7       357       986        97
VIS    2025250    183200   16.5600  147.2100      10.2       354       972        98
VIS    2025250    183200   16.5800  147.1900      10.2       350       965        95
VIS    2025250    183200   16.5600  147.1800      10.0       350       961        94
VIS    2025250    183200   16.5700  147.1500       9.4       350       943        94
VIS    2025250    183200   16.5600  147.1300       9.0       348       943        97
VIS    2025250    183200   16.5600  147.1100       8.8       349       971        98
VIS    2025250    183200   16.5700  147.0800       8.5       351       951        97
VIS    2025250    183200   16.5700  147.0600       9.0       351       891        97
VIS    2025250    183200   16.5700  147.0200       9.2       349       880        92
VIS    2025250    183200   16.5600  147.0000       8.5       350       875        93
VIS    2025250    183200   16.5700  146.9700       8.4       349       915        93
VIS    2025250    183200   16.5700  146.9500       8.6       350       920        95
VIS    2025250    183200   16.5700  146.9200       8.9       347       927        96
VIS    2025250    183200   16.5700  146.9000       9.1       348       927        95
VIS    2025250    183200   16.5700  146.7800       9.0       354       820        90
VIS    2025250    183200   16.5600  146.7600       8.3       351       820        91
VIS    2025250    183200   16.5600  146.7300       8.3       346       808        90
VIS    2025250    183200   16.5500  146.6700       8.2       348       816        90
VIS    2025250    183200   16.5800  151.4900       5.6        54       971        94
VIS    2025250    183200   16.5400  148.2400      10.7         8       907        90
VIS    2025250    183200   16.5600  148.2100       9.7         7       938        96
VIS    2025250    183200   16.5600  148.1800       9.4         7       929        96
VIS    2025250    183200   16.5500  148.1600       9.7         6       927        96
VIS    2025250    183200   16.5400  148.1300       9.5         5       933        97
VIS    2025250    183200   16.5600  148.1200       9.0         4       941        98
VIS    2025250    183200   16.5400  148.0800       9.3         3       960        96
VIS    2025250    183200   16.5500  148.0700       9.2         5       961        96
VIS    2025250    183200   16.5400  148.0400      10.1         4       966        93
VIS    2025250    183200   16.5400  147.6500       9.5       360       997        98
VIS    2025250    183200   16.5400  147.6300       9.6       359       977        97
VIS    2025250    183200   16.5500  147.6100       9.9         0       955        95
VIS    2025250    183200   16.5400  147.5800       9.8         0       877        92
VIS    2025250    183200   16.5400  147.5500       9.4       359       870        96
VIS    2025250    183200   16.5400  147.5300       9.3       359       871        96
VIS    2025250    183200   16.5500  147.5200       9.6         0       876        97
VIS    2025250    183200   16.5500  147.4900       9.9         2       949        98
VIS    2025250    183200   16.5300  147.4600      10.1       358       953        99
VIS    2025250    183200   16.5300  147.4200       9.6       359       961        98
VIS    2025250    183200   16.5500  147.4000       8.9       354       981        97
VIS    2025250    183200   16.5400  147.3600       9.7       354       980        93
VIS    2025250    183200   16.5400  147.3300       9.3       357       962        97
VIS    2025250    183200   16.5300  147.3200       9.2       357       962        97
VIS    2025250    183200   16.5500  147.2900       8.0       360       924        95
VIS    2025250    183200   16.5300  147.2600       9.1       356       939        99
VIS    2025250    183200   16.5300  147.2400       8.9       355       951        97
VIS    2025250    183200   16.5500  147.2100      10.0       352       962        99
VIS    2025250    183200   16.5500  147.1800       9.7       350       938        95
VIS    2025250    183200   16.5500  147.1600       9.1       350       933        95
VIS    2025250    183200   16.5400  147.1500       9.0       349       938        94
VIS    2025250    183200   16.5500  147.1200       9.1       349       949        98
VIS    2025250    183200   16.5400  147.0800       9.3       347       965        98
VIS    2025250    183200   16.5300  147.0500       8.7       344       957        91
VIS    2025250    183200   16.5300  147.0300       8.5       344       870        91
VIS    2025250    183200   16.5500  146.9900       8.6       351       875        94
VIS    2025250    183200   16.5300  146.9800       8.9       352       875        97
VIS    2025250    183200   16.5300  146.9400       9.7       347       920        97
VIS    2025250    183200   16.5300  146.9200       9.4       345       920        92
VIS    2025250    183200   16.5300  146.9100       9.0       346       927        91
VIS    2025250    183200   16.5400  146.7700       8.1       352       798        94
VIS    2025250    183200   16.5300  146.7600       7.7       349       798        94
VIS    2025250    183200   16.5500  146.6800       8.2       349       792        91
VIS    2025250    183200   16.5300  146.6700       8.4       352       795        92
VIS    2025250    183200   16.5300  146.6300       8.5       347       953        94
VIS    2025250    183200   16.5300  146.6000       7.6       342       910        93
VIS    2025250    183200   16.5500  146.5900       6.3       342       784        97
VIS    2025250    183200   16.5600  151.4500       6.6        61       995        93
VIS    2025250    183200   16.5300  149.7500       7.1        18       998        90
VIS    2025250    183200   16.5300  149.7500       7.3        19       998        93
VIS    2025250    183200   16.5400  149.7200       8.3        22       996        94
VIS    2025250    183200   16.5200  148.4300      10.2        30       931        91
VIS    2025250    183200   16.5200  148.4100      10.1        27       928        90
VIS    2025250    183200   16.5200  148.3700       8.9        25       950        96
VIS    2025250    183200   16.5300  148.3700       8.6        19       969        90
VIS    2025250    183200   16.5400  148.3300       8.9         9       943        90
VIS    2025250    183200   16.5200  148.3100       8.9         5       908        93
VIS    2025250    183200   16.5400  148.2300      10.7         8       932        92
VIS    2025250    183200   16.5400  148.2200      10.5         9       932        93
VIS    2025250    183200   16.5200  148.1700       9.7         8       924        96
VIS    2025250    183200   16.5200  148.1700       9.7         8       924        95
VIS    2025250    183200   16.5400  148.1300       9.6         5       933        97
VIS    2025250    183200   16.5400  148.1200       9.6         4       941        97
VIS    2025250    183200   16.5200  148.1000       9.7         5       952        97
VIS    2025250    183200   16.5200  148.0600      10.1         4       949        96
VIS    2025250    183200   16.5200  148.0300      10.9         3       954        94
VIS    2025250    183200   16.5100  148.0200      11.0         5       965        92
VIS    2025250    183200   16.5100  147.9900      10.5         6       978        91
VIS    2025250    183200   16.5300  147.6300       9.5       359       987        98
VIS    2025250    183200   16.5300  147.6000       9.9         1       955        94
VIS    2025250    183200   16.5300  147.5700       9.7         0       877        93
VIS    2025250    183200   16.5300  147.5600       9.5       360       873        93
VIS    2025250    183200   16.5200  147.5300       9.1       358       876        96
VIS    2025250    183200   16.5100  147.5000       9.4       355       950        95
VIS    2025250    183200   16.5100  147.4900       9.5       354       951        94
VIS    2025250    183200   16.5200  147.4600      10.0       356       951        99
VIS    2025250    183200   16.5200  147.4200       9.8       358       953        99
VIS    2025250    183200   16.5200  147.4200       9.7       358       953        98
VIS    2025250    183200   16.5100  147.3900       9.7       358       938        98
VIS    2025250    183200   16.5100  147.3700       9.2       354       969       100
VIS    2025250    183200   16.5200  147.2800       9.2       356       962        98
VIS    2025250    183200   16.5200  147.2700       9.2       356       963        99
VIS    2025250    183200   16.5200  147.2400       8.5       354       955        95
VIS    2025250    183200   16.5100  147.2100       7.0         0       889        93
VIS    2025250    183200   16.5200  147.1800       7.6       357       889        92
VIS    2025250    183200   16.5300  147.1700       8.8       352       933        91
VIS    2025250    183200   16.5300  147.1300       9.3       349       938        95
VIS    2025250    183200   16.5300  147.1200       9.4       348       943        96
VIS    2025250    183200   16.5300  147.0600       8.9       345       965        90
VIS    2025250    183200   16.5300  147.0300       8.4       345       852        91
VIS    2025250    183200   16.5100  147.0000       8.5       348       840        94
VIS    2025250    183200   16.5200  146.9700       9.0       352       863        97
VIS    2025250    183200   16.5200  146.9400       9.3       348       904        91
VIS    2025250    183200   16.5200  146.9300       9.4       345       920        92
VIS    2025250    183200   16.5200  146.8900       8.0       348       943        91
VIS    2025250    183200   16.5100  146.8900       7.7       349       960        91
VIS    2025250    183200   16.5100  146.7700       7.2       345       837        93
VIS    2025250    183200   16.5000  146.7600       7.1       344       837        93
VIS    2025250    183200   16.5000  146.7400       7.3       343       827        99
VIS    2025250    183200   16.5000  146.7000       8.1       347       810        97
VIS    2025250    183200   16.5000  146.6800       8.5       349       848        98
VIS    2025250    183200   16.5100  146.6600       9.0       349       882        98
VIS    2025250    183200   16.5000  146.6400       9.3       346       887        99
VIS    2025250    183200   16.5000  146.6100       9.1       342       910        96
VIS    2025250    183200   16.5000  146.5800       8.9       342       891        97
VIS    2025250    183200   16.5200  146.5300       7.8       339       841        93
VIS    2025250    183200   16.5000  146.5100       8.1       338       841        99
VIS    2025250    183200   16.5000  146.5000       7.5       338       772        93
VIS    2025250    183200   16.5100  149.7800       8.7        13       998        92
VIS    2025250    183200   16.5300  149.7500       6.6        18       998        90
VIS    2025250    183200   16.5100  149.7300       7.4        20       996        98
VIS    2025250    183200   16.5100  149.7100       7.3        23       995        97
VIS    2025250    183200   16.5000  148.4800       6.6        15       948        93
VIS    2025250    183200   16.5100  148.4700       9.1        31       948        92
VIS    2025250    183200   16.5100  148.4300      10.0        29       928        93
VIS    2025250    183200   16.5100  148.4000      10.1        27       928        90
VIS    2025250    183200   16.4900  148.3800       9.6        28       921        96
VIS    2025250    183200   16.4900  148.3700       9.2        30       921        97
VIS    2025250    183200   16.5100  148.3300       7.4        18       921        92
VIS    2025250    183200   16.5000  148.3100       7.8         5       907        93
VIS    2025250    183200   16.5100  148.2800       9.5         2       901        90
VIS    2025250    183200   16.4900  148.2600       9.6         2       904        91
VIS    2025250    183200   16.4900  148.2500       9.8         4       904        92
VIS    2025250    183200   16.5000  148.2300      10.1         6       924        93
VIS    2025250    183200   16.5100  148.1800       9.9         6       925        94
VIS    2025250    183200   16.5100  148.1600       9.7         7       924        95
VIS    2025250    183200   16.5100  148.1400       9.6         5       926        95
VIS    2025250    183200   16.5000  148.1200       9.5         4       927        95
VIS    2025250    183200   16.5100  148.0900       9.8         5       949        97
VIS    2025250    183200   16.5100  148.0800       9.9         5       933        96
VIS    2025250    183200   16.5000  148.0500      10.6         3       933        94
VIS    2025250    183200   16.5000  148.0300      10.8         4       938        93
VIS    2025250    183200   16.4900  148.0000      10.3         4       938        95
VIS    2025250    183200   16.5000  147.9800      10.1         4       970        94
VIS    2025250    183200   16.5100  147.6100       9.8         0       977        98
VIS    2025250    183200   16.4900  147.5600       9.5       360       981        98
VIS    2025250    183200   16.4900  147.5400       9.1       358       958        98
VIS    2025250    183200   16.4900  147.5300       9.1       357       953        98
VIS    2025250    183200   16.5100  147.5000       9.4       354       951        95
VIS    2025250    183200   16.4900  147.4900       9.9       355       953        96
VIS    2025250    183200   16.4900  147.4500       9.6       354       938        99
VIS    2025250    183200   16.4900  147.4300       9.5       355       915        98
VIS    2025250    183200   16.4900  147.4000       9.6       356       912        97
VIS    2025250    183200   16.5000  147.2900       9.5       357       968        96
VIS    2025250    183200   16.4900  147.2600       9.0       354       970        96
VIS    2025250    183200   16.4800  147.2400       8.6       354       970        93
VIS    2025250    183200   16.5000  147.2100       6.9         1       894        92
VIS    2025250    183200   16.5000  147.2000       7.0       360       894        92
VIS    2025250    183200   16.4900  147.1500       9.9       349       977        98
VIS    2025250    183200   16.4900  147.1300       9.9       348       970        97
VIS    2025250    183200   16.4900  147.1100       9.3       347       940        94
VIS    2025250    183200   16.5000  147.0900       9.4       349       963        90
VIS    2025250    183200   16.4800  147.0300       9.5       346       970        94
VIS    2025250    183200   16.4800  147.0200       9.3       347       968        94
VIS    2025250    183200   16.5000  147.0000       8.5       348       843        94
VIS    2025250    183200   16.4800  146.9600       8.7       351       852        98
VIS    2025250    183200   16.4900  146.8900       7.1       351       878        91
VIS    2025250    183200   16.5000  146.8700       7.3       350       965        90
VIS    2025250    183200   16.5000  146.8400       7.5       345       971        93
VIS    2025250    183200   16.5000  146.7600       7.0       344       842        91
VIS    2025250    183200   16.5000  146.7400       7.4       343       827        98
VIS    2025250    183200   16.4900  146.7300       7.6       343       852        98
VIS    2025250    183200   16.4800  146.6900       8.7       347       848        99
VIS    2025250    183200   16.4800  146.6900       8.8       346       857        99
VIS    2025250    183200   16.4900  146.6400       9.2       346       887        97
VIS    2025250    183200   16.4900  146.6400       9.3       346       906        96
VIS    2025250    183200   16.4800  146.5900       8.7       343       822        94
VIS    2025250    183200   16.5000  146.5700       8.8       342       822        94
VIS    2025250    183200   16.5000  146.5600       9.0       344       891        93
VIS    2025250    183200   16.4800  146.5300       9.2       338       919        95
VIS    2025250    183200   16.5000  146.5000       7.9       337       841        97
VIS    2025250    183200   16.4900  146.4900       7.6       336       796        91
VIS    2025250    183200   16.4800  146.4600       7.1       333       780        91
VIS    2025250    183200   16.4800  149.7600       8.3        16       988        97
VIS    2025250    183200   16.5000  149.7300       7.5        19       988        96
VIS    2025250    183200   16.4900  149.7100       7.6        17       976        96
VIS    2025250    183200   16.4800  149.6800       8.2        17       977        95
VIS    2025250    183200   16.4800  149.6700       8.1        18       988        94
VIS    2025250    183200   16.4900  148.5000       7.1         1       959        93
VIS    2025250    183200   16.4900  148.4600       6.4        21       917        97
VIS    2025250    183200   16.4900  148.4400       8.5        21       913        91
VIS    2025250    183200   16.4900  148.4100      10.0        24       910        94
VIS    2025250    183200   16.4900  148.3800       9.3        30       921        96
VIS    2025250    183200   16.4700  148.3600       8.7        29       909        98
VIS    2025250    183200   16.4700  148.3400       8.6        28       917        99
VIS    2025250    183200   16.4700  148.3100       8.8        12       909        97
VIS    2025250    183200   16.4700  148.2800       9.2         3       905        93
VIS    2025250    183200   16.4700  148.2700       9.3         3       905        92
VIS    2025250    183200   16.4800  148.2400       9.5         6       904        96
VIS    2025250    183200   16.4800  148.2100       9.9         8       933        94
VIS    2025250    183200   16.4900  148.1900       9.7         6       932        95
VIS    2025250    183200   16.4900  148.1700       9.5         6       926        94
VIS    2025250    183200   16.4700  148.1400       9.2         7       927        96
VIS    2025250    183200   16.4900  148.1200       9.3         4       927        95
VIS    2025250    183200   16.4700  148.0900       9.6         4       927        95
VIS    2025250    183200   16.4900  148.0600       9.9         4       927        94
VIS    2025250    183200   16.4700  148.0400       9.9         4       926        94
VIS    2025250    183200   16.4900  148.0300      10.5         3       936        94
VIS    2025250    183200   16.4700  147.9900      10.0         2       933        95
VIS    2025250    183200   16.4900  147.9800      10.0         3       958        95
VIS    2025250    183200   16.4700  147.9400       9.3       359       970        97
VIS    2025250    183200   16.4600  147.5300       9.1       357       981        96
VIS    2025250    183200   16.4700  147.5000       9.7       356       960        95
VIS    2025250    183200   16.4700  147.4700       9.6       355       953        96
VIS    2025250    183200   16.4600  147.4600       9.4       355       950        97
VIS    2025250    183200   16.4800  147.4200       9.5       355       912        98
VIS    2025250    183200   16.4700  147.4100       9.7       354       912        97
VIS    2025250    183200   16.4600  147.3700      10.0       351       933        90
VIS    2025250    183200   16.4800  147.2500       9.2       354       975        97
VIS    2025250    183200   16.4700  147.2400       8.7       354       975        94
VIS    2025250    183200   16.4700  147.2200       8.2       356       970        92
VIS    2025250    183200   16.4600  147.1900       9.2       350       967        97
VIS    2025250    183200   16.4700  147.1500       9.3       348       977        98
VIS    2025250    183200   16.4700  147.1300       9.0       347       932        94
VIS    2025250    183200   16.4700  147.1000       8.7       346       932        94
VIS    2025250    183200   16.4600  147.0900       8.6       348       964        96
VIS    2025250    183200   16.4800  147.0200       9.5       347       970        93
VIS    2025250    183200   16.4600  146.9900       9.0       347       978        96
VIS    2025250    183200   16.4700  146.9700       8.6       350       900        98
VIS    2025250    183200   16.4800  146.9500       8.7       351       852        98
VIS    2025250    183200   16.4600  146.8800       8.1       348       948        90
VIS    2025250    183200   16.4700  146.7800       8.1       344       964        90
VIS    2025250    183200   16.4600  146.7000       8.8       344       880        96
VIS    2025250    183200   16.4500  146.6800       9.1       343       880        92
VIS    2025250    183200   16.4600  146.6300       8.9       345       863        90
VIS    2025250    183200   16.4500  146.5600       7.1       339       803        91
VIS    2025250    183200   16.4600  146.5200       9.4       337       904        96
VIS    2025250    183200   16.4600  146.5100       9.1       337       904        95
VIS    2025250    183200   16.4700  146.4800       8.2       338       854        95
VIS    2025250    183200   16.4700  146.4600       8.0       336       796        91
VIS    2025250    183200   16.4500  146.4300       6.7       338       765        97
VIS    2025250    183200   16.4600  146.4200       5.6       328       746        98
VIS    2025250    183200   16.4800  151.4700       6.5        66       972        91
VIS    2025250    183200   16.4800  149.7600       8.1        15       988        95
VIS    2025250    183200   16.4800  149.7500       7.8        15       988        95
VIS    2025250    183200   16.4600  149.7000       8.2        14       961        95
VIS    2025250    183200   16.4700  149.7000       8.2        15       961        95
VIS    2025250    183200   16.4700  149.6700       8.3        16       976        94
VIS    2025250    183200   16.4500  148.4900       9.4        13       950        97
VIS    2025250    183200   16.4500  148.4800       8.9        13       931        96
VIS    2025250    183200   16.4700  148.4000       9.7        21       886        90
VIS    2025250    183200   16.4500  148.3600       8.8        30       886        94
VIS    2025250    183200   16.4600  148.3500       8.6        29       909        99
VIS    2025250    183200   16.4500  148.3300       8.9        26       917        97
VIS    2025250    183200   16.4500  148.3000       9.5        15       915        95
VIS    2025250    183200   16.4600  148.2800       9.6         4       907        93
VIS    2025250    183200   16.4600  148.2600       9.3         3       907        93
VIS    2025250    183200   16.4400  148.2400       9.9         7       933        96
VIS    2025250    183200   16.4600  148.1900       9.3        11       934        93
VIS    2025250    183200   16.4600  148.1900       9.3         9       933        94
VIS    2025250    183200   16.4600  148.1500       9.1         7       930        95
VIS    2025250    183200   16.4600  148.1300       9.1         6       929        96
VIS    2025250    183200   16.4600  148.1100       9.3         4       929        97
VIS    2025250    183200   16.4600  148.0900       9.6         4       926        96
VIS    2025250    183200   16.4600  148.0600       9.6         5       926        96
VIS    2025250    183200   16.4600  148.0400       9.9         4       927        94
VIS    2025250    183200   16.4500  148.0100       9.8         3       928        94
VIS    2025250    183200   16.4400  147.9800       9.8         1       933        94
VIS    2025250    183200   16.4600  147.5100       9.5       357       964        96
VIS    2025250    183200   16.4600  147.4600       9.4       355       950        97
VIS    2025250    183200   16.4400  147.4100       9.9       352       943        91
VIS    2025250    183200   16.4300  147.2300       9.8       352       987        96
VIS    2025250    183200   16.4400  147.2300       9.8       353       979        96
VIS    2025250    183200   16.4500  147.1900       9.4       350       967        98
VIS    2025250    183200   16.4500  147.1800       9.5       349       965        98
VIS    2025250    183200   16.4400  147.1600       8.8       348       964        95
VIS    2025250    183200   16.4300  147.1300       8.3       348       940        92
VIS    2025250    183200   16.4500  147.0900       8.6       348       964        94
VIS    2025250    183200   16.4500  147.0900       8.6       348       964        94
VIS    2025250    183200   16.4300  147.0600       8.3       350       964        93
VIS    2025250    183200   16.4500  146.9900       9.1       347       978        95
VIS    2025250    183200   16.4400  146.9700       9.2       348       978        95
VIS    2025250    183200   16.4400  146.9600       9.2       348       978        96
VIS    2025250    183200   16.4500  146.9400       9.1       350       933        97
VIS    2025250    183200   16.4500  146.6300       8.5       346       829        90
VIS    2025250    183200   16.4400  146.5300       8.9       335       892        93
VIS    2025250    183200   16.4400  146.5200       9.0       335       892        93
VIS    2025250    183200   16.4500  146.5000       8.7       336       904        91
VIS    2025250    183200   16.4300  146.4400       9.0       341       879        98
VIS    2025250    183200   16.4500  146.4200       7.2       334       751        93
VIS    2025250    183200   16.4400  146.3300       7.2       333       765        91
VIS    2025250    183200   16.4500  149.7500       8.9        10       988        90
VIS    2025250    183200   16.4400  149.7300       8.8         9       976        95
VIS    2025250    183200   16.4500  149.7000       8.1        13       961        94
VIS    2025250    183200   16.4400  149.6900       7.6        14       956        93
VIS    2025250    183200   16.4400  149.6700       7.8        16       950        96
VIS    2025250    183200   16.4200  148.5300       9.2         8       973        98
VIS    2025250    183200   16.4200  148.5000       9.7         8       950        96
VIS    2025250    183200   16.4400  148.4800       9.1        16       932        97
VIS    2025250    183200   16.4300  148.4600       8.4        20       907        91
VIS    2025250    183200   16.4400  148.3900       9.3        23       878        90
VIS    2025250    183200   16.4400  148.3600       8.9        26       878        92
VIS    2025250    183200   16.4400  148.3400       8.8        27       901        95
VIS    2025250    183200   16.4400  148.3200       9.2        21       915        95
VIS    2025250    183200   16.4400  148.2900       9.3        12       910        95
VIS    2025250    183200   16.4300  148.2900       9.3        11       910        94
VIS    2025250    183200   16.4200  148.2600       9.6         6       914        93
VIS    2025250    183200   16.4200  148.2300       9.9         7       936        95
VIS    2025250    183200   16.4300  148.2000       9.1        10       936        93
VIS    2025250    183200   16.4300  148.1900       8.9         8       936        94
VIS    2025250    183200   16.4200  148.1400       9.2         3       938        93
VIS    2025250    183200   16.4300  148.1200       9.3         2       951        95
VIS    2025250    183200   16.4300  148.1100       9.2         2       951        96
VIS    2025250    183200   16.4300  148.0900       9.3         3       927        94
VIS    2025250    183200   16.4300  148.0600       9.4         4       926        91
VIS    2025250    183200   16.4300  148.0200       9.7         2       928        91
VIS    2025250    183200   16.4400  147.9800       9.7         1       933        95
VIS    2025250    183200   16.4200  147.9600       9.2         1       954        98
VIS    2025250    183200   16.4200  147.7800       8.5       358       988        96
VIS    2025250    183200   16.4300  147.5100       9.3       356       984        96
VIS    2025250    183200   16.4300  147.4500       9.4       355       971        93
VIS    2025250    183200   16.4300  147.3600       9.9       351       982        91
VIS    2025250    183200   16.4300  147.3200       9.8       352       997        99
VIS    2025250    183200   16.4300  147.2800       9.5       350       994        99
VIS    2025250    183200   16.4300  147.2600       9.8       351       993        98
VIS    2025250    183200   16.4300  147.2300       9.9       352       987        96
VIS    2025250    183200   16.4100  147.2000       9.9       351       967        97
VIS    2025250    183200   16.4100  147.1800       9.7       349       964        97
VIS    2025250    183200   16.4200  147.1600       8.9       349       962        95
VIS    2025250    183200   16.4200  147.1500       8.6       349       949        93
VIS    2025250    183200   16.4100  147.1000       7.8       359       904        92
VIS    2025250    183200   16.4300  147.0800       8.3       351       956        94
VIS    2025250    183200   16.4100  147.0600       7.3       355       900        93
VIS    2025250    183200   16.4100  147.0400       7.6       354       910        95
VIS    2025250    183200   16.4100  147.0100       8.1       348       983        95
VIS    2025250    183200   16.4300  146.9600       9.3       347       978        94
VIS    2025250    183200   16.4100  146.9100       8.9       347       967        96
VIS    2025250    183200   16.4100  146.5700       7.0       340       765        90
VIS    2025250    183200   16.4100  146.5400       7.6       334       808        93
VIS    2025250    183200   16.4000  146.5200       7.2       336       815        95
VIS    2025250    183200   16.4200  146.5100       8.1       336       882        94
VIS    2025250    183200   16.4200  146.4700       8.5       341       919        93
VIS    2025250    183200   16.4000  146.4400       9.3       340       887        97
VIS    2025250    183200   16.4000  146.4300       9.4       340       887        97
VIS    2025250    183200   16.4100  146.3100       7.8       335       767        91
VIS    2025250    183200   16.4100  146.2300       7.7       317       758        97
VIS    2025250    183200   16.4000  146.2200       8.0       314       748        94
VIS    2025250    183200   16.4100  149.7900       6.7        18       987        92
VIS    2025250    183200   16.4200  149.7600       7.6        17       945        93
VIS    2025250    183200   16.4200  149.7500       8.2        14       956        92
VIS    2025250    183200   16.4300  149.7200       8.8         9       956        93
VIS    2025250    183200   16.4300  149.6700       7.9        17       950        96
VIS    2025250    183200   16.4300  149.6600       8.2        18       961        95
VIS    2025250    183200   16.4000  148.5400       8.9       360       992        97
VIS    2025250    183200   16.4200  148.5300       9.3         6       973        97
VIS    2025250    183200   16.4200  148.5000       9.7         7       950        95
VIS    2025250    183200   16.4000  148.4800       9.3         6       939        94
VIS    2025250    183200   16.4100  148.4300       8.8        17       893        92
VIS    2025250    183200   16.4100  148.4100       8.7        19       887        98
VIS    2025250    183200   16.4000  148.3700       7.8        31       878        99
VIS    2025250    183200   16.4100  148.3600       8.2        29       878        98
VIS    2025250    183200   16.4000  148.3400       8.5        22       878        97
VIS    2025250    183200   16.4000  148.3100       8.8        21       875        93
VIS    2025250    183200   16.4000  148.2500       9.2         9       914        92
VIS    2025250    183200   16.4200  148.2200       9.6         8       936        95
VIS    2025250    183200   16.4100  148.2100       9.5         9       936        95
VIS    2025250    183200   16.4100  148.1700       9.1         5       934        95
VIS    2025250    183200   16.4100  148.1700       9.2         5       934        94
VIS    2025250    183200   16.3900  148.1200       9.4         5       938        96
VIS    2025250    183200   16.4000  148.1000       9.5         3       939        96
VIS    2025250    183200   16.4100  148.0900       9.4         3       943        95
VIS    2025250    183200   16.4000  148.0600       9.8         3       925        92
VIS    2025250    183200   16.4000  148.0300       9.4         2       924        94
VIS    2025250    183200   16.4100  148.0100       9.4         2       928        94
VIS    2025250    183200   16.4100  147.9900       9.3         1       932        95
VIS    2025250    183200   16.4000  147.9600       8.8         2       937        99
VIS    2025250    183200   16.4000  147.9300       8.3         3       963        94
VIS    2025250    183200   16.4000  147.9200       8.2         4       963        95
VIS    2025250    183200   16.3900  147.8800       7.5       359       970        91
VIS    2025250    183200   16.4000  147.8500       8.4       358       974        94
VIS    2025250    183200   16.3900  147.8500       8.7       359       974        91
VIS    2025250    183200   16.3900  147.8100       9.2       358       988        95
VIS    2025250    183200   16.3900  147.7800       8.7       357       988        96
VIS    2025250    183200   16.4000  147.7600       8.7       356       956        98
VIS    2025250    183200   16.4000  147.7500       8.6       355       956        98
VIS    2025250    183200   16.4100  147.4700       9.1       356       990        98
VIS    2025250    183200   16.4100  147.4300       9.6       353       979        92
VIS    2025250    183200   16.4000  147.4100       9.5       354       971        98
VIS    2025250    183200   16.4000  147.3900       9.4       354       977        93
VIS    2025250    183200   16.4000  147.3700       9.1       354       979        98
VIS    2025250    183200   16.3900  147.3300       9.3       353       991        99
VIS    2025250    183200   16.3900  147.3100       9.5       352       991        97
VIS    2025250    183200   16.3900  147.2900       9.4       349       997        97
VIS    2025250    183200   16.3900  147.2700       9.3       350       997        98
VIS    2025250    183200   16.4100  147.2400       9.7       349       997        96
VIS    2025250    183200   16.4000  147.2300       9.8       349       987        97
VIS    2025250    183200   16.4100  147.1700       9.7       349       964        97
VIS    2025250    183200   16.4100  147.1600       9.3       351       963        96
VIS    2025250    183200   16.3900  147.1100       7.5         1       904        90
VIS    2025250    183200   16.3900  147.0800       7.2       359       851        92
VIS    2025250    183200   16.4000  147.0600       7.4       356       900        94
VIS    2025250    183200   16.3900  147.0300       8.1       353       904        97
VIS    2025250    183200   16.4000  147.0100       7.9       349       976        96
VIS    2025250    183200   16.4000  146.9600       9.2       346       996        93
VIS    2025250    183200   16.4000  146.9100       9.0       346       969        96
VIS    2025250    183200   16.3900  146.8700       8.6       345       964        93
VIS    2025250    183200   16.3900  146.5500       6.8       340       789        94
VIS    2025250    183200   16.3900  146.5200       6.5       341       815        94
VIS    2025250    183200   16.4000  146.5200       7.2       337       815        96
VIS    2025250    183200   16.3800  146.4500       8.6       337       906        91
VIS    2025250    183200   16.3900  146.4300       9.4       339       897        95
VIS    2025250    183200   16.3900  146.2300       7.9       318       774        97
VIS    2025250    183200   16.4300  151.7500       5.9        78       991        90
VIS    2025250    183200   16.4100  149.7900       6.9        17       974        92
VIS    2025250    183200   16.3900  148.5300       9.0         2       992        94
VIS    2025250    183200   16.3800  148.4900       9.2         7       939        96
VIS    2025250    183200   16.3700  148.4800       8.8         8       939        97
VIS    2025250    183200   16.3800  148.4500       9.0        14       939        94
VIS    2025250    183200   16.3700  148.4300       9.5        15       927        97
VIS    2025250    183200   16.3900  148.4100       9.1        19       897        97
VIS    2025250    183200   16.3700  148.3700       7.9        26       888        97
VIS    2025250    183200   16.3800  148.3500       7.7        22       881        95
VIS    2025250    183200   16.3800  148.3400       7.8        20       881        95
VIS    2025250    183200   16.3900  148.3100       8.7        24       875        96
VIS    2025250    183200   16.3800  148.2800       8.4        15       876        94
VIS    2025250    183200   16.3800  148.2500       8.2         5       917        96
VIS    2025250    183200   16.3900  148.2400       8.7         6       918        93
VIS    2025250    183200   16.3800  148.2000       9.1         9       918        96
VIS    2025250    183200   16.3700  148.1800       9.4         9       917        97
VIS    2025250    183200   16.3800  148.1600       9.2        12       917        96
VIS    2025250    183200   16.3700  148.1200       8.7        11       918        95
VIS    2025250    183200   16.3800  148.1000       9.2         7       934        96
VIS    2025250    183200   16.3700  148.1000       9.1         7       928        95
VIS    2025250    183200   16.3700  148.0600      10.0         5       925        95
VIS    2025250    183200   16.3700  148.0500      10.0         6       924        95
VIS    2025250    183200   16.3800  148.0100       9.2         2       925        97
VIS    2025250    183200   16.3700  147.9900       9.0         3       925        96
VIS    2025250    183200   16.3800  147.9700       8.9         1       933        96
VIS    2025250    183200   16.3800  147.9300       8.5       358       949        99
VIS    2025250    183200   16.3700  147.9200       8.4       358       936        98
VIS    2025250    183200   16.3800  147.9000       7.9       358       964        97
VIS    2025250    183200   16.3700  147.8800       8.1       359       939        94
VIS    2025250    183200   16.3800  147.8400       8.9         2       952        93
VIS    2025250    183200   16.3700  147.8300       9.3         3       952        93
VIS    2025250    183200   16.3900  147.7900       8.8       357       977        96
VIS    2025250    183200   16.3800  147.7600       8.7       356       956        97
VIS    2025250    183200   16.3800  147.4300       9.8       353       989       100
VIS    2025250    183200   16.3800  147.4100       9.6       353       966       100
VIS    2025250    183200   16.3600  147.3900       9.3       355       966        99
VIS    2025250    183200   16.3600  147.3200       8.8       353       987        91
VIS    2025250    183200   16.3600  147.2900       8.8       350       991        90
VIS    2025250    183200   16.3700  147.2700       8.6       349       995        92
VIS    2025250    183200   16.3800  147.1500       9.6       351       964        93
VIS    2025250    183200   16.3700  147.1300       7.9       356       935        90
VIS    2025250    183200   16.3800  147.0700       7.4       358       831        91
VIS    2025250    183200   16.3700  147.0500       8.1       354       851        96
VIS    2025250    183200   16.3700  147.0200       7.8       349       884        92
VIS    2025250    183200   16.3600  147.0000       7.9       344       904        93
VIS    2025250    183200   16.3600  146.9800       8.3       343       932        95
VIS    2025250    183200   16.3600  146.9600       8.3       343       991        97
VIS    2025250    183200   16.3800  146.9000       8.8       346       977        92
VIS    2025250    183200   16.3600  146.8300       6.7       346       940        91
VIS    2025250    183200   16.3700  146.5400       6.7       343       822        91
VIS    2025250    183200   16.3500  146.2500       7.0       309       827        90
VIS    2025250    183200   16.3600  146.2100       8.1       315       821        96
VIS    2025250    183200   16.3600  146.2000       8.1       316       796        96
VIS    2025250    183200   16.3500  146.1800       8.0       322       796        94
VIS    2025250    183200   16.3600  146.1400       7.3       316       756        90
VIS    2025250    183200   16.3600  148.5000       8.7         7       973        99
VIS    2025250    183200   16.3600  148.4800       8.4         8       947        98
VIS    2025250    183200   16.3600  148.4600       8.3        11       947        97
VIS    2025250    183200   16.3500  148.4400       8.7        10       948        95
VIS    2025250    183200   16.3600  148.4100       9.4        15       924        96
VIS    2025250    183200   16.3500  148.4000       9.5        17       920        97
VIS    2025250    183200   16.3500  148.3700       9.3        20       898        97
VIS    2025250    183200   16.3600  148.3500       8.3        18       888        92
VIS    2025250    183200   16.3700  148.3200       8.1        18       883        97
VIS    2025250    183200   16.3600  148.3000       8.2        22       881        94
VIS    2025250    183200   16.3600  148.2600       8.3         6       879        94
VIS    2025250    183200   16.3700  148.2300       8.1         5       918        98
VIS    2025250    183200   16.3700  148.2300       8.1         6       918        99
VIS    2025250    183200   16.3700  148.1800       9.3        10       917        97
VIS    2025250    183200   16.3600  148.1600       9.2        14       916        95
VIS    2025250    183200   16.3600  148.1300       8.8        12       917        96
VIS    2025250    183200   16.3700  148.1300       8.7        11       917        95
VIS    2025250    183200   16.3700  148.0900       9.2         7       928        95
VIS    2025250    183200   16.3600  148.0600       9.8         6       925        95
VIS    2025250    183200   16.3600  148.0600       9.9         6       925        95
VIS    2025250    183200   16.3500  148.0200       9.5         7       919        92
VIS    2025250    183200   16.3500  148.0000       9.2         5       919        91
VIS    2025250    183200   16.3600  147.9600       8.7         1       929        91
VIS    2025250    183200   16.3600  147.9400       8.6       358       930        92
VIS    2025250    183200   16.3600  147.9100       8.7       357       930        93
VIS    2025250    183200   16.3600  147.9100       8.5       358       935        97
VIS    2025250    183200   16.3400  147.8800       9.1       359       931        94
VIS    2025250    183200   16.3400  147.8500       8.6         2       936        96
VIS    2025250    183200   16.3400  147.8400       8.7         2       936        96
VIS    2025250    183200   16.3600  147.7700       8.5       357       951        93
VIS    2025250    183200   16.3400  147.4000       9.3       354       977        98
VIS    2025250    183200   16.3400  147.3700       9.1       356       975        99
VIS    2025250    183200   16.3600  147.3400       8.8       355       987        97
VIS    2025250    183200   16.3600  147.2700       8.2       350       991        91
VIS    2025250    183200   16.3500  147.2600       8.1       350       991        91
VIS    2025250    183200   16.3400  147.2300       7.9       353       971        96
VIS    2025250    183200   16.3400  147.0900       7.0       346       831        92
VIS    2025250    183200   16.3400  146.9200       7.9       343       990        93
VIS    2025250    183200   16.3400  146.8300       7.2       346       904        91
VIS    2025250    183200   16.3300  146.8300       7.2       345       891        91
VIS    2025250    183200   16.3400  146.2300       6.4       300       821        90
VIS    2025250    183200   16.3500  146.2200       7.3       310       821        94
VIS    2025250    183200   16.3400  146.1800       7.5       323       811        99
VIS    2025250    183200   16.3400  146.1600       7.6       324       801        98
VIS    2025250    183200   16.3400  146.1300       8.3       319       783        91
VIS    2025250    183200   16.3400  146.1300       8.3       318       783        90
VIS    2025250    183200   16.3400  149.3800       8.0        14       996        97
VIS    2025250    183200   16.3400  148.4600       8.1         9       948        98
VIS    2025250    183200   16.3400  148.4400       8.3         8       948        96
VIS    2025250    183200   16.3400  148.4100       9.1        13       942        94
VIS    2025250    183200   16.3400  148.4100       9.3        15       942        96
VIS    2025250    183200   16.3400  148.3700       9.5        20       898        96
VIS    2025250    183200   16.3200  148.3500       9.6        20       892        97
VIS    2025250    183200   16.3300  148.3100       9.1        25       887        95
VIS    2025250    183200   16.3300  148.3100       9.0        26       887        95
VIS    2025250    183200   16.3200  148.2300       8.6        13       920        98
VIS    2025250    183200   16.3300  148.1900       8.7        17       920        97
VIS    2025250    183200   16.3300  148.1800       8.8        15       920        97
VIS    2025250    183200   16.3300  148.1400       9.7        12       919        94
VIS    2025250    183200   16.3200  148.1300       9.7        12       920        95
VIS    2025250    183200   16.3200  148.1100       9.1        10       919        97
VIS    2025250    183200   16.3200  148.0800       8.8         5       918        97
VIS    2025250    183200   16.3400  148.0500       9.5         6       918        93
VIS    2025250    183200   16.3400  148.0300       9.6         7       918        93
VIS    2025250    183200   16.3400  148.0000       9.2         4       918        91
VIS    2025250    183200   16.3300  147.9900       9.0         3       918        91
VIS    2025250    183200   16.3300  147.9500       9.0       358       923        90
VIS    2025250    183200   16.3200  147.9200       9.2       356       923        94
VIS    2025250    183200   16.3400  147.9000       9.3       358       928        93
VIS    2025250    183200   16.3200  147.8900       9.2       357       927        95
VIS    2025250    183200   16.3300  147.8600       8.4       359       928        99
VIS    2025250    183200   16.3300  147.8300       8.5         1       928        97
VIS    2025250    183200   16.3200  147.8200       8.4         0       927        97
VIS    2025250    183200   16.3200  147.7900       8.3         2       940        96
VIS    2025250    183200   16.3400  147.7600       8.4       357       959        96
VIS    2025250    183200   16.3300  147.4100       9.4       353       984        98
VIS    2025250    183200   16.3200  147.3800       9.3       355       984        98
VIS    2025250    183200   16.3100  147.3500       9.0       355       984        97
VIS    2025250    183200   16.3200  147.3300       8.8       355       987        96
VIS    2025250    183200   16.3100  147.3200       8.8       355       987        99
VIS    2025250    183200   16.3100  147.3000       8.7       354       982        98
VIS    2025250    183200   16.3300  147.2400       8.0       352       973        95
VIS    2025250    183200   16.3100  147.2200       8.3       356       962        94
VIS    2025250    183200   16.3300  147.1800       5.5       351       969        90
VIS    2025250    183200   16.3300  147.0800       7.0       347       854        92
VIS    2025250    183200   16.3300  146.9300       7.8       343       975        91
VIS    2025250    183200   16.3200  146.8900       8.1       344       990        95
VIS    2025250    183200   16.3100  146.8800       8.0       345       987        93
VIS    2025250    183200   16.3300  146.7500       7.6       337       947        90
VIS    2025250    183200   16.3100  146.7200       8.7       337       947        93
VIS    2025250    183200   16.3300  146.7100       8.4       340       995        96
VIS    2025250    183200   16.3100  146.6500       8.0       342       971        94
VIS    2025250    183200   16.3100  146.6400       8.1       341       971        95
VIS    2025250    183200   16.3200  146.5700       7.2       338       884        91
VIS    2025250    183200   16.3200  146.1700       6.4       324       805        91
VIS    2025250    183200   16.3200  146.1000       7.8       322       800        90
VIS    2025250    183200   16.3100  145.8400       8.0       293       727        92
VIS    2025250    183200   16.3100  149.4000       8.2        11       986        92
VIS    2025250    183200   16.3100  149.3700       8.7        10       986        94
VIS    2025250    183200   16.3100  149.3200       8.7         7       995        96
VIS    2025250    183200   16.3100  148.4900       8.0         0       995        97
VIS    2025250    183200   16.3000  148.4600       7.8        17       995        94
VIS    2025250    183200   16.3200  148.4400       8.4        11       972        93
VIS    2025250    183200   16.3200  148.4100       9.1        15       942        92
VIS    2025250    183200   16.3200  148.4000       9.1        16       922        92
VIS    2025250    183200   16.3200  148.3700       9.5        23       906        96
VIS    2025250    183200   16.3100  148.3500       9.6        20       890        96
VIS    2025250    183200   16.3000  148.3200       9.4        27       886        96
VIS    2025250    183200   16.3000  148.3000       9.4        30       889        95
VIS    2025250    183200   16.3200  148.2600       8.6        15       887        90
VIS    2025250    183200   16.3200  148.2300       8.7        15       920        97
VIS    2025250    183200   16.3200  148.1900       9.0        24       920        94
VIS    2025250    183200   16.3000  148.1700       9.2        21       920        92
VIS    2025250    183200   16.3000  148.1500       9.7        13       920        93
VIS    2025250    183200   16.3100  148.1400       9.8        11       920        95
VIS    2025250    183200   16.3200  148.1100       9.0         9       919        98
VIS    2025250    183200   16.3200  148.0800       8.9         5       918        98
VIS    2025250    183200   16.3100  148.0600       9.1         5       918        97
VIS    2025250    183200   16.3000  148.0200       9.3         5       920        97
VIS    2025250    183200   16.3000  147.9900       9.1         1       920        97
VIS    2025250    183200   16.3000  147.9800       9.1       360       918        96
VIS    2025250    183200   16.3100  147.9600       9.0       358       918        96
VIS    2025250    183200   16.3100  147.9200       9.1       356       923        95
VIS    2025250    183200   16.3100  147.9100       9.1       356       924        95
VIS    2025250    183200   16.3000  147.8800       8.3       355       927        97
VIS    2025250    183200   16.3000  147.8600       7.8       352       926        96
VIS    2025250    183200   16.3000  147.8300       7.9       354       926        97
VIS    2025250    183200   16.3100  147.8000       8.1         1       927        96
VIS    2025250    183200   16.3100  147.7800       8.3         2       940        97
VIS    2025250    183200   16.3100  147.7700       8.4         2       945        96
VIS    2025250    183200   16.2900  147.7400       8.5       359       959        95
VIS    2025250    183200   16.3100  147.4100       9.3       353       996        99
VIS    2025250    183200   16.2900  147.3900       9.5       354       972        95
VIS    2025250    183200   16.3100  147.3600       9.1       355       984        97
VIS    2025250    183200   16.3100  147.3500       9.1       355       982        96
VIS    2025250    183200   16.2900  147.3200       8.9       354       965        94
VIS    2025250    183200   16.3000  147.2800       8.6       352       976        98
VIS    2025250    183200   16.2900  147.2800       8.5       352       965        98
VIS    2025250    183200   16.2900  147.2400       8.7       347       982        98
VIS    2025250    183200   16.3100  147.2100       8.4       356       962        95
VIS    2025250    183200   16.2900  147.1900       8.9       350       961        97
VIS    2025250    183200   16.2900  147.1300       8.8       345       999        98
VIS    2025250    183200   16.2900  147.0700       7.4       343       974        94
VIS    2025250    183200   16.2900  147.0600       7.3       342       972        93
VIS    2025250    183200   16.2900  147.0200       7.9       341       952        94
VIS    2025250    183200   16.2900  147.0000       8.5       342       954        94
VIS    2025250    183200   16.3000  146.9400       8.0       342       962        90
VIS    2025250    183200   16.2900  146.9000       8.2       342       959        94
VIS    2025250    183200   16.3100  146.8700       8.0       345       984        93
VIS    2025250    183200   16.3000  146.8700       7.9       344       983        93
VIS    2025250    183200   16.2900  146.7800       7.5       341       899        91
VIS    2025250    183200   16.2900  146.7500       8.4       337       899        94
VIS    2025250    183200   16.3000  146.7300       8.3       337       927        94
VIS    2025250    183200   16.2800  146.7100       7.0       338       897        93
VIS    2025250    183200   16.3000  146.1200       8.1       319       805        90
VIS    2025250    183200   16.2900  145.8500       7.7       291       720        90
VIS    2025250    183200   16.3100  149.4000       8.3        11       986        92
VIS    2025250    183200   16.2900  149.3200       8.4         7       994        90
VIS    2025250    183200   16.2900  149.1800       8.0         9       978        98
VIS    2025250    183200   16.2900  148.5200       8.2         7       996        96
VIS    2025250    183200   16.2800  148.4900       8.5        11       996        96
VIS    2025250    183200   16.2800  148.4500       8.7        16       961        94
VIS    2025250    183200   16.2900  148.4100       8.4        12       915        92
VIS    2025250    183200   16.2800  148.3600       8.4         8       883        93
VIS    2025250    183200   16.3000  148.3500       9.5        17       883        95
VIS    2025250    183200   16.2900  148.3100       9.4        28       884        96
VIS    2025250    183200   16.2800  148.2900       9.4        27       884        95
VIS    2025250    183200   16.2800  148.2800       9.6        28       888        94
VIS    2025250    183200   16.2700  148.2500       9.3        27       892        93
VIS    2025250    183200   16.2700  148.2400       9.2        26       922        90
VIS    2025250    183200   16.2900  148.2000       8.9        28       921        91
VIS    2025250    183200   16.2900  148.1900       9.1        27       921        92
VIS    2025250    183200   16.2900  148.1500       9.6        11       920        95
VIS    2025250    183200   16.2800  148.1400       9.5         8       922        96
VIS    2025250    183200   16.2800  148.1100       9.4         7       922        95
VIS    2025250    183200   16.2700  148.0700       9.2         8       920        97
VIS    2025250    183200   16.2900  148.0700       9.2         5       920        96
VIS    2025250    183200   16.2800  148.0400       9.5         8       920        96
VIS    2025250    183200   16.2900  148.0000       9.4         3       921        96
VIS    2025250    183200   16.2800  147.9900       9.4         2       921        96
VIS    2025250    183200   16.2800  147.9700       9.3         0       921        96
VIS    2025250    183200   16.2900  147.9400       9.0       359       920        92
VIS    2025250    183200   16.2800  147.9100       8.6       358       920        92
VIS    2025250    183200   16.2900  147.8900       8.3       356       923        94
VIS    2025250    183200   16.2900  147.8600       7.8       352       923        96
VIS    2025250    183200   16.2800  147.8300       8.0       352       924        93
VIS    2025250    183200   16.2700  147.8200       8.3       353       923        92
VIS    2025250    183200   16.2700  147.7800       8.6       357       925        90
VIS    2025250    183200   16.2700  147.7600       8.2       357       927        90
VIS    2025250    183200   16.2800  147.7400       8.4       357       959        94
VIS    2025250    183200   16.2800  147.4300       8.9       354       986        98
VIS    2025250    183200   16.2800  147.4000       9.4       355       972        97
VIS    2025250    183200   16.2700  147.3600       9.3       354       963        97
VIS    2025250    183200   16.2800  147.3200       9.0       354       965        93
VIS    2025250    183200   16.2700  147.3000       8.8       353       951        95
VIS    2025250    183200   16.2900  147.2700       8.5       351       965        98
VIS    2025250    183200   16.2700  147.2700       8.7       351       958        98
VIS    2025250    183200   16.2700  147.2200       8.7       347       981        97
VIS    2025250    183200   16.2700  147.2200       8.6       347       979        96
VIS    2025250    183200   16.2800  147.1800       9.1       350       961        97
VIS    2025250    183200   16.2800  147.1300       9.0       347       996        98
VIS    2025250    183200   16.2800  147.0800       8.0       348       996        96
VIS    2025250    183200   16.2600  147.0600       8.3       344       976        96
VIS    2025250    183200   16.2700  147.0300       8.2       343       972        95
VIS    2025250    183200   16.2700  147.0300       8.3       343       972        96
VIS    2025250    183200   16.2600  147.0000       8.9       344       967        97
VIS    2025250    183200   16.2800  146.9600       8.1       344       944        90
VIS    2025250    183200   16.2800  146.9500       8.3       345       944        94
VIS    2025250    183200   16.2800  146.9200       8.1       344       940        94
VIS    2025250    183200   16.2800  146.9000       8.3       342       952        93
VIS    2025250    183200   16.2700  146.8700       8.4       342       952        94
VIS    2025250    183200   16.2600  146.8400       7.8       345       974        95
VIS    2025250    183200   16.2600  146.8100       7.4       350       920        93
VIS    2025250    183200   16.2700  146.8100       7.6       350       920        93
VIS    2025250    183200   16.2600  146.7600       8.7       341       920        94
VIS    2025250    183200   16.2600  146.7500       8.0       340       911        91
VIS    2025250    183200   16.2800  146.7400       7.5       340       897        93
VIS    2025250    183200   16.2800  146.6900       5.9       339       860        91
VIS    2025250    183200   16.2800  146.5800       6.9       338       844        90
VIS    2025250    183200   16.2600  146.5500       7.3       333       884        90
VIS    2025250    183200   16.2600  146.5400       7.5       333       899        90
VIS    2025250    183200   16.2600  146.1400       8.3       317       776        96
VIS    2025250    183200   16.2700  146.1100       8.2       314       794        91
VIS    2025250    183200   16.2800  149.3800       8.4        11       984        92
VIS    2025250    183200   16.2600  149.1800       7.8         9       978        91
VIS    2025250    183200   16.2800  149.1500       7.4         8       987        94
VIS    2025250    183200   16.2500  148.4800       8.4        10       961        98
VIS    2025250    183200   16.2500  148.4700       8.7        11       961        98
VIS    2025250    183200   16.2600  148.4500       8.6        12       943        95
VIS    2025250    183200   16.2600  148.4200       8.2        11       909        94
VIS    2025250    183200   16.2500  148.4000       7.6         9       891        93
VIS    2025250    183200   16.2600  148.3600       8.0         8       878        92
VIS    2025250    183200   16.2600  148.3300       8.6         9       876        93
VIS    2025250    183200   16.2600  148.3100       9.1        20       876        95
VIS    2025250    183200   16.2600  148.3000       9.2        21       876        96
VIS    2025250    183200   16.2700  148.2600       9.5        28       888        93
VIS    2025250    183200   16.2600  148.2300       9.3        23       922        90
VIS    2025250    183200   16.2600  148.2200       9.4        17       928        91
VIS    2025250    183200   16.2500  148.2000       9.6        12       923        94
VIS    2025250    183200   16.2500  148.1800       9.4        11       923        96
VIS    2025250    183200   16.2700  148.1500       9.1         8       922        96
VIS    2025250    183200   16.2500  148.1100       9.0         7       920        96
VIS    2025250    183200   16.2500  148.1100       9.0         8       919        95
VIS    2025250    183200   16.2700  148.0800       9.3         8       920        97
VIS    2025250    183200   16.2500  148.0400       8.9        10       919        95
VIS    2025250    183200   16.2500  148.0200       9.4         8       919        93
VIS    2025250    183200   16.2600  148.0100       9.8         7       920        92
VIS    2025250    183200   16.2600  147.9800       9.7         3       920        93
VIS    2025250    183200   16.2700  147.9400       9.1         2       918        94
VIS    2025250    183200   16.2500  147.9200       9.1         4       917        94
VIS    2025250    183200   16.2600  147.8900       8.6       359       917        94
VIS    2025250    183200   16.2700  147.8900       8.4       358       918        94
VIS    2025250    183200   16.2500  147.8600       8.5       357       918        92
VIS    2025250    183200   16.2600  147.8300       8.7       354       921        92
VIS    2025250    183200   16.2600  147.8200       9.0       355       921        92
VIS    2025250    183200   16.2600  147.7900       8.8       356       923        90
VIS    2025250    183200   16.2700  147.7500       8.2       356       927        91
VIS    2025250    183200   16.2500  147.7400       8.5       355       922        92
VIS    2025250    183200   16.2500  147.7200       8.6       356       945        96
VIS    2025250    183200   16.2400  147.6100       8.8       359       970        98
VIS    2025250    183200   16.2500  147.4500       8.6       352       991        94
VIS    2025250    183200   16.2400  147.4300       8.7       352       967        95
VIS    2025250    183200   16.2600  147.4000       9.3       354       962        96
VIS    2025250    183200   16.2400  147.3800       9.0       354       926        90
VIS    2025250    183200   16.2600  147.3600       9.3       354       963        97
VIS    2025250    183200   16.2500  147.3400       8.9       353       935        94
VIS    2025250    183200   16.2600  147.3000       8.8       353       943        94
VIS    2025250    183200   16.2500  147.2800       8.9       351       910        92
VIS    2025250    183200   16.2600  147.2700       8.8       351       958        97
VIS    2025250    183200   16.2500  147.2500       8.7       349       981        97
VIS    2025250    183200   16.2400  147.2100       8.4       349       966        91
VIS    2025250    183200   16.2600  147.1500       9.2       350       974        92
VIS    2025250    183200   16.2600  147.1300       8.9       349       987        93
VIS    2025250    183200   16.2500  147.0800       8.9       347       996        96
VIS    2025250    183200   16.2500  147.0800       8.8       346       988        96
VIS    2025250    183200   16.2400  147.0400       8.5       343       975        94
VIS    2025250    183200   16.2400  147.0300       8.6       343       968        94
VIS    2025250    183200   16.2600  146.9900       9.0       343       956        96
VIS    2025250    183200   16.2400  146.9800       8.7       344       949        98
VIS    2025250    183200   16.2500  146.9400       8.5       347       938        95
VIS    2025250    183200   16.2500  146.9100       8.6       345       938        91
VIS    2025250    183200   16.2600  146.9100       8.4       344       936        91
VIS    2025250    183200   16.2400  146.8600       8.2       341       923        92
VIS    2025250    183200   16.2600  146.8400       7.6       345       967        94
VIS    2025250    183200   16.2500  146.7800       8.7       344       914        93
VIS    2025250    183200   16.2500  146.7400       8.4       342       923        92
VIS    2025250    183200   16.2400  146.7400       8.9       342       938        90
VIS    2025250    183200   16.2500  146.1500       8.2       317       776        91
VIS    2025250    183200   16.2400  145.9700       8.5       300       757        90
VIS    2025250    183200   16.2400  145.8500       8.1       294       733        90
VIS    2025250    183200   16.2400  145.8100       7.3       287       727        93
VIS    2025250    183200   16.2400  148.4800       8.4         9       961        97
VIS    2025250    183200   16.2400  148.4600       8.6        10       943        94
VIS    2025250    183200   16.2500  148.4400       8.7        10       919        94
VIS    2025250    183200   16.2400  148.4000       7.9        15       886        96
VIS    2025250    183200   16.2300  148.3700       7.3        13       838        93
VIS    2025250    183200   16.2500  148.3600       7.7         8       878        93
VIS    2025250    183200   16.2500  148.3000       8.9        17       874        96
VIS    2025250    183200   16.2400  148.2800       8.9        17       830        91
VIS    2025250    183200   16.2500  148.1900       9.7        12       923        93
VIS    2025250    183200   16.2300  148.1300       8.6         7       918        93
VIS    2025250    183200   16.2300  148.1300       8.6         7       915        93
VIS    2025250    183200   16.2200  148.0900       8.7         6       912        93
VIS    2025250    183200   16.2400  148.0800       8.9         8       918        93
VIS    2025250    183200   16.2300  148.0400       8.5         9       913        92
VIS    2025250    183200   16.2400  148.0200       9.0         8       918        93
VIS    2025250    183200   16.2300  147.9200       9.3         4       912        90
VIS    2025250    183200   16.2300  147.9100       9.1         3       910        91
VIS    2025250    183200   16.2300  147.8800       8.7       359       909        91
VIS    2025250    183200   16.2400  147.7500       8.4       357       910        91
VIS    2025250    183200   16.2200  147.7100       8.5       359       909        93
VIS    2025250    183200   16.2400  147.6900       7.8       358       949        97
VIS    2025250    183200   16.2400  147.6400       8.0       359       931        95
VIS    2025250    183200   16.2400  147.6300       8.2       359       960        96
VIS    2025250    183200   16.2200  147.6000       8.6       357       970        97
VIS    2025250    183200   16.2300  147.4400       8.5       351       976        96
VIS    2025250    183200   16.2300  147.4300       8.6       352       952        96
VIS    2025250    183200   16.2400  147.3900       9.0       355       922        90
VIS    2025250    183200   16.2400  147.3700       8.8       354       922        91
VIS    2025250    183200   16.2200  147.3500       8.5       351       903        92
VIS    2025250    183200   16.2200  147.3300       8.5       350       909        93
VIS    2025250    183200   16.2300  147.2900       8.8       352       909        93
VIS    2025250    183200   16.2200  147.2800       8.8       352       887        90
VIS    2025250    183200   16.2400  147.2200       8.5       349       971        94
VIS    2025250    183200   16.2400  147.2100       8.4       349       966        92
VIS    2025250    183200   16.2400  147.1700       8.6       351       964        90
VIS    2025250    183200   16.2200  147.1600       8.4       351       964        94
VIS    2025250    183200   16.2300  147.1200       8.4       350       964        93
VIS    2025250    183200   16.2400  147.1100       8.4       347       972        92
VIS    2025250    183200   16.2300  147.0100       8.6       345       956        94
VIS    2025250    183200   16.2200  146.9800       8.5       344       938        96
VIS    2025250    183200   16.2200  146.9700       8.2       344       935        97
VIS    2025250    183200   16.2100  146.9400       8.1       341       938        93
VIS    2025250    183200   16.2300  146.9100       8.4       344       933        93
VIS    2025250    183200   16.2200  146.9000       8.1       342       922        90
VIS    2025250    183200   16.2200  146.8700       7.6       340       906        90
VIS    2025250    183200   16.2200  146.7900       8.4       340       941        97
VIS    2025250    183200   16.2200  146.7800       8.8       340       941        97
VIS    2025250    183200   16.2200  146.7500       9.5       342       948        92
VIS    2025250    183200   16.2200  149.3300       8.5         8       995        90
VIS    2025250    183200   16.2100  149.3000       8.2        11       995        95
VIS    2025250    183200   16.2100  149.2700       7.9        10       975        94
VIS    2025250    183200   16.2100  149.2200       8.2         5       983        94
VIS    2025250    183200   16.2100  149.1800       8.3         8       992        97
VIS    2025250    183200   16.2100  149.0800       7.2        17       994        96
VIS    2025250    183200   16.2100  149.0700       7.1        16       994        97
VIS    2025250    183200   16.2100  149.0500       7.0        14       980        99
VIS    2025250    183200   16.2200  148.5200       7.8        12       991        93
VIS    2025250    183200   16.2000  148.4700       8.4        10       946        95
VIS    2025250    183200   16.2000  148.4500       8.4        15       946        95
VIS    2025250    183200   16.2200  148.4400       8.7        14       919        96
VIS    2025250    183200   16.2100  148.4000       7.7        20       841        96
VIS    2025250    183200   16.2100  148.3800       7.2        16       829        91
VIS    2025250    183200   16.2000  148.3300       8.5        14       827        90
VIS    2025250    183200   16.2100  148.3000       8.1        16       825        91
VIS    2025250    183200   16.2100  148.2700       8.5        17       825        91
VIS    2025250    183200   16.2200  148.2600       8.9        14       830        90
VIS    2025250    183200   16.2000  148.2200       9.2        22       908        90
VIS    2025250    183200   16.2100  148.1500       8.9        15       913        91
VIS    2025250    183200   16.2000  148.1500       8.8        14       911        92
VIS    2025250    183200   16.2200  148.1200       8.4         8       913        94
VIS    2025250    183200   16.2100  148.0800       8.8         8       911        93
VIS    2025250    183200   16.2100  148.0700       8.8         8       911        91
VIS    2025250    183200   16.2200  148.0400       8.6         9       913        91
VIS    2025250    183200   16.2000  148.0200       8.7        10       915        94
VIS    2025250    183200   16.2200  147.9800       9.3         4       913        91
VIS    2025250    183200   16.2000  147.9700       9.0         4       913        92
VIS    2025250    183200   16.2200  147.9400       9.5         6       912        90
VIS    2025250    183200   16.2100  147.9200       9.2         4       912        91
VIS    2025250    183200   16.2100  147.9000       8.8         1       910        92
VIS    2025250    183200   16.2100  147.8800       8.5       360       909        92
VIS    2025250    183200   16.2000  147.6900       8.6       357       906        91
VIS    2025250    183200   16.2000  147.6600       8.1       357       909        93
VIS    2025250    183200   16.2000  147.6200       8.1       356       905        94
VIS    2025250    183200   16.2000  147.6100       8.3       354       931        97
VIS    2025250    183200   16.2100  147.4600       8.4       352       962        97
VIS    2025250    183200   16.2100  147.4400       8.6       352       952        97
VIS    2025250    183200   16.2000  147.4000       8.6       354       940        92
VIS    2025250    183200   16.2000  147.3900       8.6       354       926        92
VIS    2025250    183200   16.2000  147.3500       8.3       349       895        92
VIS    2025250    183200   16.2100  147.3300       8.4       349       903        92
VIS    2025250    183200   16.2000  147.2600       8.7       351       885        90
VIS    2025250    183200   16.2100  147.2400       8.3       350       934        94
VIS    2025250    183200   16.2000  147.2200       8.1       351       934        93
VIS    2025250    183200   16.2000  147.1800       8.0       349       952        97
VIS    2025250    183200   16.1900  147.1700       8.0       347       952        98
VIS    2025250    183200   16.2000  147.1400       8.5       349       961        97
VIS    2025250    183200   16.2000  147.1200       8.4       350       950        96
VIS    2025250    183200   16.1900  147.1000       8.3       349       950        96
VIS    2025250    183200   16.1900  147.0700       7.9       346       935        93
VIS    2025250    183200   16.2100  147.0500       7.7       344       957        90
VIS    2025250    183200   16.2100  147.0300       7.8       341       952        91
VIS    2025250    183200   16.2000  147.0000       8.4       343       918        94
VIS    2025250    183200   16.2100  146.9800       8.2       344       925        96
VIS    2025250    183200   16.2100  146.9400       7.9       341       938        93
VIS    2025250    183200   16.2000  146.9300       7.9       339       938        94
VIS    2025250    183200   16.2000  146.9100       8.2       340       934        92
VIS    2025250    183200   16.2000  146.8700       7.6       342       906        93
VIS    2025250    183200   16.2000  146.8200       8.1       344       938        97
VIS    2025250    183200   16.1900  146.7900       7.9       339       941        97
VIS    2025250    183200   16.2100  146.7700       8.8       339       948        98
VIS    2025250    183200   16.2100  146.7500       9.4       342       961        95
VIS    2025250    183200   16.1900  146.7000       8.7       340       975        93
VIS    2025250    183200   16.1900  146.6900       8.4       340       965        94
VIS    2025250    183200   16.1900  146.6500       7.9       340       843        91
VIS    2025250    183200   16.1900  146.4700       8.0       333       885        96
VIS    2025250    183200   16.1900  146.4500       6.9       331       847        91
VIS    2025250    183200   16.1800  146.0900       8.9       305       959        96
VIS    2025250    183200   16.2100  151.3500       6.9        62       998        91
VIS    2025250    183200   16.2000  149.2000       8.5         8       992        98
VIS    2025250    183200   16.2000  149.1800       8.3        10       978        98
VIS    2025250    183200   16.1900  149.1600       7.9        12       973        98
VIS    2025250    183200   16.1900  149.1400       7.7        12       973        96
VIS    2025250    183200   16.1900  149.1000       8.1        15       973        98
VIS    2025250    183200   16.1900  149.0800       7.7        14       945        98
VIS    2025250    183200   16.2000  149.0500       7.3        14       977        97
VIS    2025250    183200   16.1900  149.0100       7.3         9       975        93
VIS    2025250    183200   16.1900  148.5500       7.6       358       992       100
VIS    2025250    183200   16.1900  148.5500       7.8       360       992        99
VIS    2025250    183200   16.1800  148.5200       7.6         2       992        94
VIS    2025250    183200   16.1900  148.4800       8.3        20       974        91
VIS    2025250    183200   16.2000  148.4500       8.3        15       946        97
VIS    2025250    183200   16.2000  148.4400       8.3        16       938        97
VIS    2025250    183200   16.1800  148.4200       8.4        16       897        98
VIS    2025250    183200   16.1800  148.3900       8.0        15       829        91
VIS    2025250    183200   16.1900  148.3600       7.7        11       826        90
VIS    2025250    183200   16.2000  148.2900       8.3        18       824        91
VIS    2025250    183200   16.1900  148.2200       9.0        23       907        90
VIS    2025250    183200   16.1900  148.2000       8.6        20       908        91
VIS    2025250    183200   16.1800  148.1800       8.5        19       908        91
VIS    2025250    183200   16.1900  148.1300       8.8        16       911        93
VIS    2025250    183200   16.1800  148.0900       9.0        12       910        92
VIS    2025250    183200   16.1800  148.0600       8.8        13       912        90
VIS    2025250    183200   16.1800  148.0600       8.7        14       912        90
VIS    2025250    183200   16.1900  148.0100       8.8        19       915        93
VIS    2025250    183200   16.1900  148.0000       8.7        14       916        94
VIS    2025250    183200   16.1900  147.9900       8.8        10       917        94
VIS    2025250    183200   16.1800  147.9500       9.0         4       917        93
VIS    2025250    183200   16.1700  147.9200       8.5         2       917        92
VIS    2025250    183200   16.1800  147.8900       8.2       359       914        93
VIS    2025250    183200   16.1900  147.8900       8.0       359       914        93
VIS    2025250    183200   16.1900  147.8500       7.5         1       912        94
VIS    2025250    183200   16.1900  147.8300       8.0         2       912        91
VIS    2025250    183200   16.1800  147.7800       8.5       356       912        91
VIS    2025250    183200   16.1800  147.6100       8.1       354       888        91
VIS    2025250    183200   16.1800  147.4600       8.6       352       963        90
VIS    2025250    183200   16.1800  147.4300       8.6       351       960        91
VIS    2025250    183200   16.1900  147.4100       8.6       353       940        93
VIS    2025250    183200   16.1900  147.4000       8.6       353       927        92
VIS    2025250    183200   16.1700  147.3600       8.0       350       895        94
VIS    2025250    183200   16.1900  147.3500       8.2       349       895        94
VIS    2025250    183200   16.1700  147.3200       7.9       347       887        91
VIS    2025250    183200   16.1900  147.2400       8.3       350       910        97
VIS    2025250    183200   16.1900  147.2300       8.1       351       918        96
VIS    2025250    183200   16.1700  147.1900       7.8       350       914        97
VIS    2025250    183200   16.1800  147.1800       7.9       349       914        97
VIS    2025250    183200   16.1800  147.1600       8.1       346       928        96
VIS    2025250    183200   16.1700  147.1300       8.5       348       918        93
VIS    2025250    183200   16.1800  147.1000       8.4       350       928        96
VIS    2025250    183200   16.1700  147.0700       8.0       348       903        98
VIS    2025250    183200   16.1700  147.0600       8.0       348       898        97
VIS    2025250    183200   16.1700  147.0400       8.0       345       894        92
VIS    2025250    183200   16.1800  147.0100       8.3       341       896        94
VIS    2025250    183200   16.1700  146.9800       7.2       342       906        90
VIS    2025250    183200   16.1700  146.9500       6.9       341       922        91
VIS    2025250    183200   16.1800  146.9400       7.3       339       925        90
VIS    2025250    183200   16.1900  146.9200       8.1       335       942        93
VIS    2025250    183200   16.1700  146.8700       7.8       343       935        98
VIS    2025250    183200   16.1800  146.8600       7.9       344       917        98
VIS    2025250    183200   16.1600  146.8300       7.8       341       896        93
VIS    2025250    183200   16.1600  146.8100       7.7       338       896        93
VIS    2025250    183200   16.1800  146.7900       7.9       338       941        97
VIS    2025250    183200   16.1800  146.7600       8.1       338       950        94
VIS    2025250    183200   16.1800  146.7400       8.4       339       961        92
VIS    2025250    183200   16.1800  146.7300       9.0       339       973        91
VIS    2025250    183200   16.1700  146.6500       8.5       338       868        91
VIS    2025250    183200   16.1800  146.4600       7.8       332       905        96
VIS    2025250    183200   16.1600  146.4400       6.8       333       869        91
VIS    2025250    183200   16.1900  151.3400       7.7        73       993        90
VIS    2025250    183200   16.1600  149.2100       8.5         7       990        93
VIS    2025250    183200   16.1600  149.1900       8.4        10       973        95
VIS    2025250    183200   16.1800  149.1600       7.9        13       963        97
VIS    2025250    183200   16.1800  149.1500       7.6        14       963        97
VIS    2025250    183200   16.1600  149.1200       7.8        12       950        98
VIS    2025250    183200   16.1800  149.0900       7.8        15       945        98
VIS    2025250    183200   16.1600  148.5800       8.2       359       990        93
VIS    2025250    183200   16.1600  148.5600       7.8         3       990        98
VIS    2025250    183200   16.1600  148.5400       7.6         5       983        99
VIS    2025250    183200   16.1600  148.5100       7.5         9       992        98
VIS    2025250    183200   16.1600  148.4800       7.6        22       947        97
VIS    2025250    183200   16.1600  148.4600       7.5        19       918       100
VIS    2025250    183200   16.1700  148.4400       7.9        15       918       100
VIS    2025250    183200   16.1600  148.4000       8.2        20       841        90
VIS    2025250    183200   16.1700  148.2300       8.9        20       904        90
VIS    2025250    183200   16.1700  148.2000       8.3        18       907        91
VIS    2025250    183200   16.1700  148.1700       8.5        20       908        90
VIS    2025250    183200   16.1700  148.1500       8.3        19       910        91
VIS    2025250    183200   16.1500  148.1300       8.4        19       910        93
VIS    2025250    183200   16.1600  148.0900       9.0        12       912        92
VIS    2025250    183200   16.1700  148.0600       8.6        13       912        92
VIS    2025250    183200   16.1700  148.0500       8.4        15       912        93
VIS    2025250    183200   16.1700  148.0300       8.0        18       912        94
VIS    2025250    183200   16.1600  147.9900       8.5        17       918        93
VIS    2025250    183200   16.1600  147.9800       8.7        16       921        93
VIS    2025250    183200   16.1600  147.9400       9.0         7       919        91
VIS    2025250    183200   16.1600  147.8400       7.8         1       914        93
VIS    2025250    183200   16.1600  147.8400       7.8         2       914        93
VIS    2025250    183200   16.1500  147.8100       8.2       360       914        93
VIS    2025250    183200   16.1500  147.7700       8.2       356       912        93
VIS    2025250    183200   16.1500  147.7700       8.3       357       910        92
VIS    2025250    183200   16.1500  147.6100       8.2       355       882        90
VIS    2025250    183200   16.1500  147.4400       8.5       350       963        99
VIS    2025250    183200   16.1500  147.4000       8.0       352       940        96
VIS    2025250    183200   16.1500  147.3700       7.8       352       896        92
VIS    2025250    183200   16.1600  147.3600       7.9       350       895        94
VIS    2025250    183200   16.1500  147.3400       7.7       347       894        96
VIS    2025250    183200   16.1500  147.3000       7.8       348       889        93
VIS    2025250    183200   16.1600  147.2600       8.3       350       886        92
VIS    2025250    183200   16.1500  147.2300       7.8       350       920        96
VIS    2025250    183200   16.1400  147.2200       7.7       349       920        95
VIS    2025250    183200   16.1600  147.1900       7.8       349       914        96
VIS    2025250    183200   16.1600  147.1700       8.0       346       912        96
VIS    2025250    183200   16.1600  147.1300       8.4       347       912        93
VIS    2025250    183200   16.1500  147.1200       8.3       348       902        94
VIS    2025250    183200   16.1400  147.0800       8.4       348       882        94
VIS    2025250    183200   16.1400  147.0700       8.4       348       884        94
VIS    2025250    183200   16.1600  147.0500       8.0       347       893        94
VIS    2025250    183200   16.1500  147.0100       7.5       340       894        94
VIS    2025250    183200   16.1600  146.8800       7.6       342       935        97
VIS    2025250    183200   16.1600  146.8400       7.7       342       904        94
VIS    2025250    183200   16.1600  146.8200       7.7       340       890        93
VIS    2025250    183200   16.1500  146.7900       7.5       338       890        93
VIS    2025250    183200   16.1500  146.7900       7.4       339       890        93
VIS    2025250    183200   16.1500  146.7600       7.6       338       904        94
VIS    2025250    183200   16.1400  146.7200       8.0       338       923        96
VIS    2025250    183200   16.1400  146.7100       7.8       338       923        96
VIS    2025250    183200   16.1400  146.6800       7.7       335       954        94
VIS    2025250    183200   16.1400  146.6200       7.3       331       864        97
VIS    2025250    183200   16.1400  146.6100       6.9       330       864        98
VIS    2025250    183200   16.1400  146.5700       6.2       331       885        94
VIS    2025250    183200   16.1400  146.5700       6.1       331       885        93
VIS    2025250    183200   16.1500  146.4600       7.3       336       905        90
VIS    2025250    183200   16.1800  151.3400       7.8        73       988        90
VIS    2025250    183200   16.1600  149.2100       8.6         8       990        92
VIS    2025250    183200   16.1600  149.2000       8.4        10       978        93
VIS    2025250    183200   16.1600  149.1500       7.9        13       950        94
VIS    2025250    183200   16.1400  149.1400       7.6        11       950        95
VIS    2025250    183200   16.1600  149.1300       7.7        12       950        97
VIS    2025250    183200   16.1300  148.5400       8.1         8       981        93
VIS    2025250    183200   16.1400  148.5200       7.6         8       969        99
VIS    2025250    183200   16.1400  148.5100       7.6        10       963        98
VIS    2025250    183200   16.1400  148.4900       7.5        14       936        99
VIS    2025250    183200   16.1400  148.4500       7.4        15       913        96
VIS    2025250    183200   16.1400  148.4300       7.6        13       881        95
VIS    2025250    183200   16.1400  148.4200       7.7        14       847        93
VIS    2025250    183200   16.1400  148.2400       8.5        11       903        93
VIS    2025250    183200   16.1400  148.2000       8.4        15       906        93
VIS    2025250    183200   16.1400  148.1800       8.3        17       906        92
VIS    2025250    183200   16.1400  148.1700       8.3        17       907        92
VIS    2025250    183200   16.1500  148.1300       8.4        18       910        93
VIS    2025250    183200   16.1300  148.1100       8.4        13       914        94
VIS    2025250    183200   16.1300  148.0900       8.9        11       917        91
VIS    2025250    183200   16.1300  148.0600       8.4        11       916        92
VIS    2025250    183200   16.1300  148.0400       7.8         7       916        94
VIS    2025250    183200   16.1400  148.0100       7.8        12       916        95
VIS    2025250    183200   16.1500  147.9900       8.4        16       922        93
VIS    2025250    183200   16.1500  147.8500       8.5       359       919        90
VIS    2025250    183200   16.1400  147.8300       8.3       358       918        90
VIS    2025250    183200   16.1400  147.8100       8.3       359       915        92
VIS    2025250    183200   16.1400  147.6300       8.4       357       882        90
VIS    2025250    183200   16.1400  147.5200       8.3       352       973        99
VIS    2025250    183200   16.1200  147.5000       8.3       350       973        98
VIS    2025250    183200   16.1400  147.4700       8.0       348       973        99
VIS    2025250    183200   16.1400  147.4600       8.0       348       973        99
VIS    2025250    183200   16.1400  147.4300       8.2       350       963        99
VIS    2025250    183200   16.1200  147.4100       8.0       351       954        98
VIS    2025250    183200   16.1200  147.3900       7.6       352       892        95
VIS    2025250    183200   16.1300  147.3700       7.6       351       892        94
VIS    2025250    183200   16.1400  147.3400       7.7       349       898        94
VIS    2025250    183200   16.1200  147.3100       7.7       350       904        92
VIS    2025250    183200   16.1300  147.2800       7.7       350       898        92
VIS    2025250    183200   16.1400  147.2600       7.8       350       890        93
VIS    2025250    183200   16.1400  147.2300       7.6       349       920        94
VIS    2025250    183200   16.1400  147.2100       7.7       348       934        94
VIS    2025250    183200   16.1400  147.2000       7.7       348       934        94
VIS    2025250    183200   16.1200  147.1800       7.0       342       933        91
VIS    2025250    183200   16.1200  147.1500       6.7       339       896        91
VIS    2025250    183200   16.1400  147.1100       8.2       348       896        93
VIS    2025250    183200   16.1400  147.0900       8.4       348       882        94
VIS    2025250    183200   16.1400  147.0800       8.5       348       882        94
VIS    2025250    183200   16.1400  147.0600       8.4       348       892        91
VIS    2025250    183200   16.1200  147.0300       7.8       344       892        97
VIS    2025250    183200   16.1400  147.0100       7.4       340       893        94
VIS    2025250    183200   16.1300  146.8300       7.4       342       874        92
VIS    2025250    183200   16.1200  146.8100       7.7       337       874        93
VIS    2025250    183200   16.1400  146.7800       7.4       340       885        96
VIS    2025250    183200   16.1400  146.7600       7.4       341       885        95
VIS    2025250    183200   16.1400  146.7200       7.8       339       921        96
VIS    2025250    183200   16.1300  146.7100       7.8       338       923        96
VIS    2025250    183200   16.1300  146.6900       7.1       337       923        94
VIS    2025250    183200   16.1200  146.6700       6.9       336       954        93
VIS    2025250    183200   16.1100  146.6300       8.7       337       974        96
VIS    2025250    183200   16.1300  146.6000       7.0       331       864        98
VIS    2025250    183200   16.1300  146.5900       6.3       332       885        94
VIS    2025250    183200   16.1300  146.5700       6.2       332       885        94
VIS    2025250    183200   16.1200  146.5400       6.7       332       934        95
VIS    2025250    183200   16.1100  146.5200       6.9       335       938        95
VIS    2025250    183200   16.1100  146.1400       7.6       314       873        90
VIS    2025250    183200   16.1100  145.9100      10.2       305       990        96
VIS    2025250    183200   16.1100  145.9000       9.8       299       982        93
VIS    2025250    183200   16.1100  145.7300       7.4       294       840        91
VIS    2025250    183200   16.1000  142.2200       8.8       179       856        91
VIS    2025250    183200   16.0900  142.2200       8.8       180       888        91
VIS    2025250    183200   16.0900  142.1900       8.5       180       917        92
VIS    2025250    183200   16.1300  149.7100       7.6        15       995        99
VIS    2025250    183200   16.1200  149.7000       8.0        12       988        98
VIS    2025250    183200   16.1100  149.1800       8.2        10       987        95
VIS    2025250    183200   16.1300  149.1500       8.0        10       950        93
VIS    2025250    183200   16.1200  149.1400       7.4        10       950        95
VIS    2025250    183200   16.1300  148.5700       8.5         8       983        91
VIS    2025250    183200   16.1200  148.5000       7.8        14       927        91
VIS    2025250    183200   16.1200  148.4800       7.8        14       922        94
VIS    2025250    183200   16.1300  148.4200       7.5        13       847        91
VIS    2025250    183200   16.1100  148.2200       7.9         5       903        92
VIS    2025250    183200   16.1000  148.1900       8.1         6       904        92
VIS    2025250    183200   16.1000  148.1900       8.2         6       904        92
VIS    2025250    183200   16.1100  148.1500       9.0         9       908        91
VIS    2025250    183200   16.1100  148.1300       9.5         7       910        90
VIS    2025250    183200   16.1000  148.1200       9.5         8       917        91
VIS    2025250    183200   16.1000  148.0800       8.5         8       920        94
VIS    2025250    183200   16.1000  147.8700       8.2       357       930        90
VIS    2025250    183200   16.1100  147.8000       7.7       358       920        90
VIS    2025250    183200   16.1100  147.7500       8.6       353       893        91
VIS    2025250    183200   16.1000  147.5100       8.1       348       963        98
VIS    2025250    183200   16.1000  147.4900       8.1       349       969        96
VIS    2025250    183200   16.1200  147.4900       8.3       350       973        96
VIS    2025250    183200   16.1000  147.4600       8.3       350       969        96
VIS    2025250    183200   16.1000  147.4200       8.5       351       954        90
VIS    2025250    183200   16.1200  147.4000       8.0       351       920        96
VIS    2025250    183200   16.1200  147.3900       7.7       352       892        94
VIS    2025250    183200   16.1200  147.3200       7.7       350       904        91
VIS    2025250    183200   16.1100  147.3100       7.7       350       909        91
VIS    2025250    183200   16.1000  147.2900       7.7       350       900        90
VIS    2025250    183200   16.1100  147.2500       7.2       348       902        95
VIS    2025250    183200   16.1000  147.1200       7.5       343       893        92
VIS    2025250    183200   16.1000  147.0800       7.7       344       891        94
VIS    2025250    183200   16.0900  147.0500       7.3       340       890        96
VIS    2025250    183200   16.1000  147.0300       7.6       340       892        98
VIS    2025250    183200   16.0900  147.0200       7.6       339       892        98
VIS    2025250    183200   16.1100  146.9900       8.1       342       892        92
VIS    2025250    183200   16.0900  146.9600       7.4       340       902        95
VIS    2025250    183200   16.0900  146.8400       6.8       348       878        91
VIS    2025250    183200   16.0900  146.8200       7.2       338       874        91
VIS    2025250    183200   16.1100  146.8000       7.9       335       874        92
VIS    2025250    183200   16.0900  146.7700       8.3       336       880        96
VIS    2025250    183200   16.1000  146.7500       8.3       338       879        94
VIS    2025250    183200   16.1000  146.7300       8.3       339       877        98
VIS    2025250    183200   16.0900  146.7000       8.3       340       888        95
VIS    2025250    183200   16.1000  146.6700       7.5       335       937        95
VIS    2025250    183200   16.0900  146.6500       8.5       335       944        98
VIS    2025250    183200   16.0900  146.6200       8.9       336       949        95
VIS    2025250    183200   16.1000  146.5900       7.8       334       951        95
VIS    2025250    183200   16.0900  146.5500       7.1       333       934        95
VIS    2025250    183200   16.0900  146.5400       7.7       332       934        98
VIS    2025250    183200   16.1000  146.5100       6.9       337       934        93
VIS    2025250    183200   16.1000  146.4800       7.0       340       918        90
VIS    2025250    183200   16.0900  146.4700       7.8       335       918        96
VIS    2025250    183200   16.1000  146.4300       6.4       335       888        90
VIS    2025250    183200   16.1000  146.1300       7.4       308       893        91
VIS    2025250    183200   16.1000  146.1100       7.0       299       876        90
VIS    2025250    183200   16.1000  145.9300      10.8       310       992        97
VIS    2025250    183200   16.1000  145.9100       9.6       302       990        93
VIS    2025250    183200   16.0900  145.7500       7.4       291       852        90
VIS    2025250    183200   16.0800  142.3000       7.9       173       736        94
VIS    2025250    183200   16.0600  142.2900       8.1       172       783        93
VIS    2025250    183200   16.0700  142.2500       8.1       175       741        91
VIS    2025250    183200   16.0700  142.2500       8.1       176       753        90
VIS    2025250    183200   16.1000  149.7600       8.3        18       991        94
VIS    2025250    183200   16.1200  149.7400       8.0        20       993        97
VIS    2025250    183200   16.1000  149.7000       7.5        12       958        98
VIS    2025250    183200   16.1000  149.6600       7.3         9       958        96
VIS    2025250    183200   16.0900  149.1500       8.1         6       991        98
VIS    2025250    183200   16.0900  148.5000       8.9        19       930        92
VIS    2025250    183200   16.1000  148.2500       8.2         6       901        92
VIS    2025250    183200   16.1000  148.2200       7.9         5       903        93
VIS    2025250    183200   16.1000  148.1900       8.0         5       903        93
VIS    2025250    183200   16.1000  148.1800       8.1         6       903        93
VIS    2025250    183200   16.0800  148.1500       8.7         7       904        94
VIS    2025250    183200   16.0800  148.1300       9.2         8       911        92
VIS    2025250    183200   16.1000  148.1100       9.3         8       917        92
VIS    2025250    183200   16.0800  148.0800       8.2         7       920        94
VIS    2025250    183200   16.1000  147.7900       7.5       355       922        90
VIS    2025250    183200   16.0800  147.7600       7.9       353       925        93
VIS    2025250    183200   16.0900  147.5300       8.3       347       955        98
VIS    2025250    183200   16.0800  147.5200       8.3       348       955        97
VIS    2025250    183200   16.0900  147.4800       8.0       350       963        96
VIS    2025250    183200   16.0800  147.4700       7.9       348       947        96
VIS    2025250    183200   16.0800  147.3100       7.9       345       911        91
VIS    2025250    183200   16.0900  147.3000       7.8       346       911        90
VIS    2025250    183200   16.0900  147.2700       7.6       348       898        91
VIS    2025250    183200   16.0900  147.2500       7.2       349       902        94
VIS    2025250    183200   16.0800  147.2300       7.3       350       931        90
VIS    2025250    183200   16.0700  147.1000       7.2       344       892        95
VIS    2025250    183200   16.0700  147.0800       7.1       342       890        96
VIS    2025250    183200   16.0900  147.0500       7.1       338       865        96
VIS    2025250    183200   16.0700  147.0300       7.4       337       896        96
VIS    2025250    183200   16.0700  147.0200       7.6       336       902        97
VIS    2025250    183200   16.0900  146.9900       7.9       341       902        98
VIS    2025250    183200   16.0700  146.9600       6.2       336       910        92
VIS    2025250    183200   16.0700  146.9300       6.2       340       898        93
VIS    2025250    183200   16.0800  146.9100       6.7       347       888        96
VIS    2025250    183200   16.0700  146.8800       6.7       350       881        96
VIS    2025250    183200   16.0700  146.8700       6.6       349       880        93
VIS    2025250    183200   16.0900  146.8100       7.2       337       876        93
VIS    2025250    183200   16.0700  146.8000       7.2       338       879        92
VIS    2025250    183200   16.0900  146.7600       8.3       336       880        96
VIS    2025250    183200   16.0800  146.7300       8.0       337       880        98
VIS    2025250    183200   16.0800  146.7100       8.8       339       886        97
VIS    2025250    183200   16.0800  146.7000       8.5       339       888        96
VIS    2025250    183200   16.0900  146.6700       8.1       335       925        97
VIS    2025250    183200   16.0900  146.6400       8.9       334       944        97
VIS    2025250    183200   16.0900  146.6100       8.8       336       949        91
VIS    2025250    183200   16.0900  146.5500       7.6       332       941        95
VIS    2025250    183200   16.0800  146.5300       8.5       331       941        98
VIS    2025250    183200   16.0700  146.5000       8.8       332       928        97
VIS    2025250    183200   16.0700  146.4900       8.7       332       918        98
VIS    2025250    183200   16.0700  146.4400       8.0       329       907        99
VIS    2025250    183200   16.0600  146.4300       7.2       330       907        97
VIS    2025250    183200   16.0600  146.4000       5.3       328       828        92
VIS    2025250    183200   16.0700  145.8200       8.2       304       922        93
VIS    2025250    183200   16.0700  145.7000       6.7       285       858        95
VIS    2025250    183200   16.0600  145.6800       7.1       287       801        90
VIS    2025250    183200   16.0600  142.2900       8.0       172       817        92
VIS    2025250    183200   16.0500  142.2700       7.7       172       817        95
VIS    2025250    183200   16.0500  142.2400       7.7       176       828        92
VIS    2025250    183200   16.0400  142.2200       7.5       177       851        90
VIS    2025250    183200   16.0700  149.9300       8.0        15       951        93
VIS    2025250    183200   16.0800  149.9200       7.9        14       959        91
VIS    2025250    183200   16.0700  149.9000       7.5        17       959        96
VIS    2025250    183200   16.0900  149.7900       9.1        16       991        90
VIS    2025250    183200   16.0900  149.7600       8.2        19       991        94
VIS    2025250    183200   16.0700  149.7300       6.7        21       985        99
VIS    2025250    183200   16.0700  149.7100       6.8        13       958        99
VIS    2025250    183200   16.0900  149.7000       7.1        11       958        97
VIS    2025250    183200   16.0800  149.6600       7.4         8       958        94
VIS    2025250    183200   16.0900  149.6500       7.3         9       977        95
VIS    2025250    183200   16.0900  149.1500       8.0         7       987        98
VIS    2025250    183200   16.0600  148.5200       9.6        27       957        90
VIS    2025250    183200   16.0600  148.2300       8.4        11       900        94
VIS    2025250    183200   16.0700  148.2300       8.2         9       901        91
VIS    2025250    183200   16.0700  148.2000       7.8         7       901        95
VIS    2025250    183200   16.0600  148.1600       7.9         9       902        96
VIS    2025250    183200   16.0600  148.1400       8.6        11       904        94
VIS    2025250    183200   16.0800  148.1300       9.1         9       908        92
VIS    2025250    183200   16.0600  148.0900       8.1         7       918        96
VIS    2025250    183200   16.0600  147.7900       7.4       349       952        91
VIS    2025250    183200   16.0700  147.7600       7.8       353       929        94
VIS    2025250    183200   16.0700  147.7600       8.0       354       929        94
VIS    2025250    183200   16.0500  147.7300       7.7       360       905        92
VIS    2025250    183200   16.0600  147.6000       7.9       360       888        90
VIS    2025250    183200   16.0500  147.5700       8.2       353       896        93
VIS    2025250    183200   16.0500  147.5600       8.4       352       896        93
VIS    2025250    183200   16.0500  147.4800       7.6       349       876        90
VIS    2025250    183200   16.0600  147.4600       7.6       347       947        95
VIS    2025250    183200   16.0500  147.4200       7.5       346       944        97
VIS    2025250    183200   16.0600  147.3000       7.4       343       911        93
VIS    2025250    183200   16.0500  147.2800       7.1       344       894        90
VIS    2025250    183200   16.0500  147.2400       7.3       348       906        94
VIS    2025250    183200   16.0500  147.2300       7.0       345       931        94
VIS    2025250    183200   16.0600  147.1400       7.1       347       923        92
VIS    2025250    183200   16.0500  147.1100       6.7       344       912        92
VIS    2025250    183200   16.0700  147.0900       7.0       343       892        95
VIS    2025250    183200   16.0500  147.0700       7.2       339       907        94
VIS    2025250    183200   16.0700  147.0400       7.1       338       872        93
VIS    2025250    183200   16.0700  147.0200       7.5       338       902        95
VIS    2025250    183200   16.0500  147.0100       7.4       340       910        91
VIS    2025250    183200   16.0500  146.8900       6.6       343       887        91
VIS    2025250    183200   16.0500  146.8900       6.6       343       896        90
VIS    2025250    183200   16.0500  146.8000       7.1       343       874        93
VIS    2025250    183200   16.0500  146.7900       7.0       345       874        94
VIS    2025250    183200   16.0400  146.7700       6.9       347       886        93
VIS    2025250    183200   16.0500  146.7200       7.3       339       895        96
VIS    2025250    183200   16.0500  146.7000       8.0       338       895        98
VIS    2025250    183200   16.0400  146.6900       7.6       340       895        97
VIS    2025250    183200   16.0400  146.6600       7.6       331       895        94
VIS    2025250    183200   16.0500  146.5600       8.3       329       957        95
VIS    2025250    183200   16.0500  146.5500       8.6       328       957        96
VIS    2025250    183200   16.0600  146.5100       9.2       331       928        98
VIS    2025250    183200   16.0600  146.4800       9.5       329       916        97
VIS    2025250    183200   16.0600  146.4800       9.4       329       914        99
VIS    2025250    183200   16.0400  146.4300       7.7       331       898        95
VIS    2025250    183200   16.0500  146.4100       7.3       331       850        98
VIS    2025250    183200   16.0400  146.4000       7.3       331       837        96
VIS    2025250    183200   16.0500  145.7200       6.8       285       858        96
VIS    2025250    183200   16.0100  142.3000       8.3       177       931        90
VIS    2025250    183200   16.0300  142.2800       7.7       172       890        92
VIS    2025250    183200   16.0100  142.2600       7.8       175       902        94
VIS    2025250    183200   16.0300  142.2300       7.5       176       851        90
VIS    2025250    183200   16.0700  149.9300       7.9        17       951        93
VIS    2025250    183200   16.0600  149.9300       7.7        17       951        95
VIS    2025250    183200   16.0700  149.9000       7.1        18       959        97
VIS    2025250    183200   16.0500  149.8600       6.8        17       989        92
VIS    2025250    183200   16.0500  149.8500       7.7        15       992        94
VIS    2025250    183200   16.0500  149.8100       8.4        14       976        92
VIS    2025250    183200   16.0500  149.8000       8.2        14       976        94
VIS    2025250    183200   16.0500  149.7800       7.8        14       976        96
VIS    2025250    183200   16.0600  149.7300       7.0        17       943        99
VIS    2025250    183200   16.0700  149.7300       6.7        18       944        99
VIS    2025250    183200   16.0700  149.7100       6.7        13       958        98
VIS    2025250    183200   16.0500  149.6800       6.9        10       958        94
VIS    2025250    183200   16.0500  149.6400       7.4        12       991        98
VIS    2025250    183200   16.0600  149.1800       7.2         6       992        97
VIS    2025250    183200   16.0600  149.1400       7.5         6       987        95
VIS    2025250    183200   16.0300  148.3500       8.7        12       832        91
VIS    2025250    183200   16.0400  148.2400       8.5        13       898        93
VIS    2025250    183200   16.0400  148.2100       8.2        14       901        95
VIS    2025250    183200   16.0500  148.2000       7.9        13       901        96
VIS    2025250    183200   16.0400  148.1800       7.9        12       902        96
VIS    2025250    183200   16.0500  148.1400       7.9        13       904        95
VIS    2025250    183200   16.0500  148.1400       8.1        13       904        95
VIS    2025250    183200   16.0500  148.1000       8.2         9       915        95
VIS    2025250    183200   16.0400  148.0700       7.8        11       932        92
VIS    2025250    183200   16.0400  148.0600       8.0        11       948        90
VIS    2025250    183200   16.0500  147.8000       7.4       350       962        94
VIS    2025250    183200   16.0500  147.7700       7.6       351       938        94
VIS    2025250    183200   16.0300  147.7400       7.4       353       938        93
VIS    2025250    183200   16.0300  147.7300       7.3       357       911        94
VIS    2025250    183200   16.0500  147.7000       7.6       357       890        94
VIS    2025250    183200   16.0300  147.6700       7.6       354       885        97
VIS    2025250    183200   16.0500  147.5600       8.4       352       896        93
VIS    2025250    183200   16.0500  147.5600       8.5       352       896        92
VIS    2025250    183200   16.0300  147.5300       8.2       353       882        92
VIS    2025250    183200   16.0300  147.5000       7.8       355       867        94
VIS    2025250    183200   16.0400  147.4800       7.5       351       873        95
VIS    2025250    183200   16.0400  147.4600       7.3       349       877        95
VIS    2025250    183200   16.0400  147.4200       7.2       347       922        99
VIS    2025250    183200   16.0200  147.4100       7.1       348       905        99
VIS    2025250    183200   16.0200  147.3700       7.6       350       955        94
VIS    2025250    183200   16.0200  147.3600       7.6       352       955        95
VIS    2025250    183200   16.0200  147.3200       7.3       354       942        96
VIS    2025250    183200   16.0200  147.3200       7.3       354       931        95
VIS    2025250    183200   16.0300  147.2900       6.7       349       894        90
VIS    2025250    183200   16.0400  147.2500       7.1       347       894        91
VIS    2025250    183200   16.0200  147.2300       7.1       342       906        96
VIS    2025250    183200   16.0300  147.0800       6.4       337       937        93
VIS    2025250    183200   16.0200  147.0500       7.1       339       928        93
VIS    2025250    183200   16.0300  146.8900       6.8       343       931        91
VIS    2025250    183200   16.0200  146.8600       7.0       342       887        90
VIS    2025250    183200   16.0400  146.7700       6.8       347       886        93
VIS    2025250    183200   16.0400  146.7600       6.8       346       886        92
VIS    2025250    183200   16.0300  146.6900       7.1       341       895        96
VIS    2025250    183200   16.0300  146.6700       6.7       335       893        93
VIS    2025250    183200   16.0400  146.4300       7.4       331       882        91
VIS    2025250    183200   16.0100  146.1200      10.1       316       959        97
VIS    2025250    183200   16.0200  145.7300       7.8       293       943        96
VIS    2025250    183200   15.9900  142.3900       7.0       184       903        98
VIS    2025250    183200   16.0100  142.2800       8.2       176       902        93
VIS    2025250    183200   16.0100  142.2600       7.9       176       902        95
VIS    2025250    183200   16.0000  142.2400       7.7       178       902        92
VIS    2025250    183200   16.0000  142.1900       7.1       179       925        92
VIS    2025250    183200   16.0300  149.9400       8.1        16       988        92
VIS    2025250    183200   16.0300  149.9200       7.2        19       961        98
VIS    2025250    183200   16.0400  149.8600       7.2        16       992        90
VIS    2025250    183200   16.0400  149.8400       7.9        13       994        93
VIS    2025250    183200   16.0300  149.8000       8.6        11       972        91
VIS    2025250    183200   16.0400  149.7900       8.2        12       962        93
VIS    2025250    183200   16.0300  149.7500       7.9         9       933        92
VIS    2025250    183200   16.0300  149.7200       7.2        10       923        91
VIS    2025250    183200   16.0300  149.7000       7.0        12       911        92
VIS    2025250    183200   16.0300  149.6700       7.3        11       941        95
VIS    2025250    183200   16.0300  149.6600       7.5        11       941        95
VIS    2025250    183200   16.0200  149.1900       7.2         6       956        91
VIS    2025250    183200   16.0300  149.1600       7.0         6       987        97
VIS    2025250    183200   16.0200  149.1500       7.0         6       977        97
VIS    2025250    183200   16.0300  148.3700       8.4         6       838        90
VIS    2025250    183200   16.0300  148.3500       8.7        14       834        91
VIS    2025250    183200   16.0100  148.3200       8.3        22       831        92
VIS    2025250    183200   16.0200  148.3100       8.0        15       830        92
VIS    2025250    183200   16.0100  148.2300       8.9        15       903        90
VIS    2025250    183200   16.0200  148.2100       8.5        14       903        92
VIS    2025250    183200   16.0200  148.1800       8.1        10       902        94
VIS    2025250    183200   16.0200  148.1700       7.9         9       902        93
VIS    2025250    183200   16.0200  148.1500       7.8         9       902        92
VIS    2025250    183200   16.0200  148.1100       8.8         8       906        92
VIS    2025250    183200   16.0200  148.1000       8.7         9       906        93
VIS    2025250    183200   16.0100  148.0700       8.4        10       916        92
VIS    2025250    183200   16.0100  148.0500       8.4         8       926        93
VIS    2025250    183200   16.0100  148.0300       8.9         6       945        93
VIS    2025250    183200   16.0100  147.9100       8.4       357       975        96
VIS    2025250    183200   16.0000  147.8300       7.8       352       994        94
VIS    2025250    183200   16.0000  147.8200       8.5       356       986        95
VIS    2025250    183200   16.0100  147.7800       7.9       353       963        90
VIS    2025250    183200   16.0200  147.7800       7.8       352       963        90
VIS    2025250    183200   16.0000  147.7300       7.6       351       952        94
VIS    2025250    183200   16.0200  147.7200       7.1       359       909        95
VIS    2025250    183200   16.0100  147.6900       7.3       355       890        97
VIS    2025250    183200   16.0000  147.6700       7.5       356       887        96
VIS    2025250    183200   16.0000  147.6400       7.8       359       883        95
VIS    2025250    183200   16.0200  147.6100       7.4       353       867        95
VIS    2025250    183200   16.0100  147.6000       7.3       353       873        96
VIS    2025250    183200   16.0000  147.5600       7.8       356       882        93
VIS    2025250    183200   16.0200  147.5400       8.0       354       883        92
VIS    2025250    183200   16.0000  147.5200       7.7       353       883        94
VIS    2025250    183200   16.0000  147.5000       7.6       354       877        95
VIS    2025250    183200   16.0000  147.4700       7.5       354       874        96
VIS    2025250    183200   16.0000  147.4500       7.7       352       877        95
VIS    2025250    183200   16.0100  147.4200       7.6       351       896        96
VIS    2025250    183200   16.0000  147.4000       7.4       350       904        93
VIS    2025250    183200   16.0200  147.3800       7.5       349       927        96
VIS    2025250    183200   16.0100  147.3600       7.7       352       927        94
VIS    2025250    183200   16.0100  147.3200       7.1       354       912        91
VIS    2025250    183200   16.0200  147.2600       6.8       344       880        94
VIS    2025250    183200   16.0200  147.2300       7.1       342       906        97
VIS    2025250    183200   16.0100  147.2200       7.3       344       906        97
VIS    2025250    183200   16.0100  147.1900       7.0       341       957        92
VIS    2025250    183200   16.0000  147.0200       7.1       342       877        95
VIS    2025250    183200   16.0000  146.9200       6.6       338       955        92
VIS    2025250    183200   16.0000  146.8800       7.2       338       934        94
VIS    2025250    183200   16.0200  146.8700       7.0       340       920        94
VIS    2025250    183200   16.0000  146.6500       5.6       330       826        91
VIS    2025250    183200   15.9900  146.5800       7.0       330       965        91
VIS    2025250    183200   16.0100  146.1100      10.0       316       959        95
VIS    2025250    183200   16.0000  146.1100       9.9       316       959        91
VIS    2025250    183200   15.9900  146.0400       9.5       311       966        92
VIS    2025250    183200   16.0000  146.0400      11.4       314       988        96
VIS    2025250    183200   15.9900  146.0000      10.0       310       972        90
VIS    2025250    183200   15.9900  145.7300       8.2       299       943        92
VIS    2025250    183200   15.9900  145.7300       8.2       297       937        94
VIS    2025250    183200   16.0000  145.6900       7.8       288       826        92
VIS    2025250    183200   15.9800  142.4000       6.9       185       884        96
VIS    2025250    183200   15.9700  142.2900       8.8       180       917        92
VIS    2025250    183200   15.9900  142.2700       8.5       178       902        94
VIS    2025250    183200   15.9700  142.2600       8.1       179       902        95
VIS    2025250    183200   15.9800  142.2300       7.6       179       888        91
VIS    2025250    183200   16.0200  149.9400       7.9        16       983        94
VIS    2025250    183200   16.0200  149.9100       6.8        19       961        99
VIS    2025250    183200   16.0200  149.9100       6.4        20       961        98
VIS    2025250    183200   16.0100  149.8600       8.7         8       984        92
VIS    2025250    183200   16.0100  149.8600       8.9         8       984        91
VIS    2025250    183200   16.0100  149.8100       8.2        10       972        91
VIS    2025250    183200   16.0100  149.8100       8.4         9       972        91
VIS    2025250    183200   16.0000  149.7700       7.7        13       940        91
VIS    2025250    183200   16.0200  149.7500       7.8         9       926        90
VIS    2025250    183200   16.0000  149.6700       8.4         9       941        91
VIS    2025250    183200   16.0000  149.6600       8.3         9       950        93
VIS    2025250    183200   15.9900  149.1900       7.0         7       975        97
VIS    2025250    183200   16.0000  149.1600       6.9         9       970        97
VIS    2025250    183200   16.0000  149.1500       6.9         8       970        96
VIS    2025250    183200   15.9900  148.4500       9.9         4       978        91
VIS    2025250    183200   15.9900  148.4100       9.1        13       870        94
VIS    2025250    183200   15.9900  148.3900       8.0        16       847        95
VIS    2025250    183200   15.9900  148.3500       8.4        20       838        93
VIS    2025250    183200   16.0000  148.3200       8.6        24       831        90
VIS    2025250    183200   16.0000  148.2200       8.9        14       903        91
VIS    2025250    183200   16.0000  148.2100       8.8        13       903        91
VIS    2025250    183200   15.9900  148.1700       8.3         8       903        90
VIS    2025250    183200   16.0000  148.1500       8.1         7       902        90
VIS    2025250    183200   16.0000  148.1400       8.1         7       902        92
VIS    2025250    183200   15.9900  148.1000       8.5         9       905        93
VIS    2025250    183200   15.9900  148.0800       8.6         9       907        91
VIS    2025250    183200   16.0000  148.0700       8.4        10       916        91
VIS    2025250    183200   15.9900  148.0000       9.6        11       945        91
VIS    2025250    183200   15.9800  147.9700       8.5        17       934        93
VIS    2025250    183200   15.9800  147.9400       7.7         9       969        94
VIS    2025250    183200   15.9800  147.9000       7.8       358       962        96
VIS    2025250    183200   15.9800  147.8900       7.7       358       962        96
VIS    2025250    183200   15.9800  147.8700       7.2       357       963        99
VIS    2025250    183200   16.0000  147.8300       7.8       352       994        97
VIS    2025250    183200   15.9900  147.8200       8.8       354       986        97
VIS    2025250    183200   15.9800  147.7800       8.1       357       974        96
VIS    2025250    183200   15.9800  147.7800       8.1       357       974        97
VIS    2025250    183200   15.9900  147.7500       7.9       354       963        98
VIS    2025250    183200   15.9900  147.7200       7.8       351       952        98
VIS    2025250    183200   15.9900  147.6900       7.4       353       890        95
VIS    2025250    183200   15.9900  147.6800       7.4       354       890        96
VIS    2025250    183200   15.9900  147.6500       7.8       359       887        94
VIS    2025250    183200   15.9900  147.6200       7.5       356       882        96
VIS    2025250    183200   15.9800  147.5900       7.5       352       879        92
VIS    2025250    183200   15.9800  147.5600       7.6       355       885        91
VIS    2025250    183200   15.9900  147.5500       7.6       355       885        92
VIS    2025250    183200   16.0000  147.5200       7.7       353       885        94
VIS    2025250    183200   15.9900  147.5000       7.5       354       887        94
VIS    2025250    183200   16.0000  147.4800       7.5       354       875        96
VIS    2025250    183200   15.9900  147.4200       7.6       352       898        90
VIS    2025250    183200   15.9800  147.3800       7.5       346       889        93
VIS    2025250    183200   16.0000  147.3500       7.4       350       889        91
VIS    2025250    183200   15.9900  147.3400       7.1       349       887        90
VIS    2025250    183200   15.9800  147.2500       7.1       351       880        96
VIS    2025250    183200   15.9800  147.2300       7.5       347       895        94
VIS    2025250    183200   15.9900  147.2100       7.3       347       920        91
VIS    2025250    183200   15.9800  147.1700       6.5       337       999        91
VIS    2025250    183200   15.9800  147.0300       6.8       337       931        92
VIS    2025250    183200   15.9700  147.0100       6.9       340       880        93
VIS    2025250    183200   15.9700  147.0000       7.0       339       880        93
VIS    2025250    183200   15.9700  146.9300       7.1       338       949        94
VIS    2025250    183200   15.9800  146.8900       7.6       337       955        97
VIS    2025250    183200   15.9900  146.8800       7.5       336       934        93
VIS    2025250    183200   15.9700  146.6600       6.6       332       867        96
VIS    2025250    183200   15.9700  146.2700       9.0       326       909        94
VIS    2025250    183200   15.9700  146.2500       9.0       326       912        95
VIS    2025250    183200   15.9700  146.2300       9.6       322       922        98
VIS    2025250    183200   15.9700  146.2000       8.8       318       920        91
VIS    2025250    183200   15.9700  146.1600       9.1       316       911        92
VIS    2025250    183200   15.9800  146.1600       9.2       316       934        94
VIS    2025250    183200   15.9800  146.0500       9.1       309       959        92
VIS    2025250    183200   15.9800  146.0400       8.8       309       960        90
VIS    2025250    183200   15.9800  145.7900      10.7       308       971        97
VIS    2025250    183200   15.9600  142.3400       7.4       181       924        90
VIS    2025250    183200   15.9400  142.2800       7.7       178       934        94
VIS    2025250    183200   15.9600  142.2600       7.9       179       910        96
VIS    2025250    183200   15.9500  142.2400       7.7       176       874        92
VIS    2025250    183200   16.0000  150.3100       8.4        30       996        90
VIS    2025250    183200   16.0000  150.3000       8.5        29       996        93
VIS    2025250    183200   15.9800  150.2400       8.8        30       977        91
VIS    2025250    183200   16.0000  150.2300       7.9        26       992        93
VIS    2025250    183200   15.9900  150.1400       7.8        16      1000        95
VIS    2025250    183200   15.9800  149.9200       8.4        21       979        91
VIS    2025250    183200   15.9800  149.9100       8.2        20       961        94
VIS    2025250    183200   15.9900  149.8700       8.7         8       962        91
VIS    2025250    183200   16.0000  149.8200       7.9        10       972        91
VIS    2025250    183200   15.9900  149.7800       7.7        13       970        91
VIS    2025250    183200   15.9800  149.7500       6.6        15       957        92
VIS    2025250    183200   15.9900  149.7400       6.4        15       940        92
VIS    2025250    183200   15.9800  149.7100       7.5        10       943        92
VIS    2025250    183200   15.9800  149.1900       7.0         6       975        94
VIS    2025250    183200   15.9800  149.1800       7.0         7       975        94
VIS    2025250    183200   15.9600  148.4700       7.2         3       980        97
VIS    2025250    183200   15.9600  148.4500       7.0         6       978        98
VIS    2025250    183200   15.9600  148.4400       6.2         9       970        96
VIS    2025250    183200   15.9600  148.4100       6.3        17       916        92
VIS    2025250    183200   15.9800  148.3900       8.0        16       847        95
VIS    2025250    183200   15.9600  148.3600       7.8        18       837        93
VIS    2025250    183200   15.9700  148.3200       8.8        20       830        90
VIS    2025250    183200   15.9800  148.3200       9.1        22       830        90
VIS    2025250    183200   15.9800  148.2200       8.8        15       905        91
VIS    2025250    183200   15.9800  148.2100       8.8        15       905        92
VIS    2025250    183200   15.9700  148.1900       8.5        14       904        94
VIS    2025250    183200   15.9700  148.1600       8.2        10       903        92
VIS    2025250    183200   15.9700  148.1300       8.0        10       903        94
VIS    2025250    183200   15.9700  148.1100       8.0        11       903        94
VIS    2025250    183200   15.9800  148.0900       8.3        10       905        93
VIS    2025250    183200   15.9600  148.0700       8.6         9       905        92
VIS    2025250    183200   15.9600  148.0000       9.0        12       908        91
VIS    2025250    183200   15.9700  147.9600       7.7        16       918        96
VIS    2025250    183200   15.9600  147.9500       7.6        16       918        95
VIS    2025250    183200   15.9800  147.9100       7.8         0       962        95
VIS    2025250    183200   15.9800  147.8900       7.6       359       962        96
VIS    2025250    183200   15.9700  147.8700       7.3       359       962        98
VIS    2025250    183200   15.9800  147.8600       7.3       357       964        98
VIS    2025250    183200   15.9700  147.8100       8.0       354       972        94
VIS    2025250    183200   15.9800  147.7900       8.0       357       974        96
VIS    2025250    183200   15.9700  147.7700       8.0       356       960        98
VIS    2025250    183200   15.9600  147.7400       7.9       354       949        97
VIS    2025250    183200   15.9600  147.7200       7.9       353       932        97
VIS    2025250    183200   15.9700  147.7000       7.6       349       926        97
VIS    2025250    183200   15.9500  147.6700       7.4       351       925        97
VIS    2025250    183200   15.9700  147.6600       7.7       355       891        93
VIS    2025250    183200   15.9600  147.6200       7.9       354       887        91
VIS    2025250    183200   15.9600  147.6100       7.9       354       887        91
VIS    2025250    183200   15.9600  147.5200       7.5       356       893        90
VIS    2025250    183200   15.9500  147.5100       7.5       357       894        90
VIS    2025250    183200   15.9600  147.4700       7.5       353       892        91
VIS    2025250    183200   15.9600  147.4000       7.1       350       902        92
VIS    2025250    183200   15.9600  147.3900       7.2       348       900        95
VIS    2025250    183200   15.9700  147.3500       7.4       345       876        91
VIS    2025250    183200   15.9700  147.2500       7.0       352       880        94
VIS    2025250    183200   15.9500  147.2500       7.0       353       886        91
VIS    2025250    183200   15.9600  146.9900       6.9       340       880        92
VIS    2025250    183200   15.9600  146.9800       6.9       341       880        90
VIS    2025250    183200   15.9500  146.5600       7.7       323       938        96
VIS    2025250    183200   15.9500  146.5300       9.0       324       921        99
VIS    2025250    183200   15.9500  146.5200       8.6       324       921        96
VIS    2025250    183200   15.9400  146.3600       7.8       324       850        90
VIS    2025250    183200   15.9600  146.2400       9.4       323       912        98
VIS    2025250    183200   15.9500  146.2200       8.7       320       920        92
VIS    2025250    183200   15.9600  146.2000       8.7       318       920        93
VIS    2025250    183200   15.9400  146.1800       8.9       316       891        95
VIS    2025250    183200   15.9400  146.1500       9.0       315       899        97
VIS    2025250    183200   15.9400  146.1200       7.9       313       906        92
VIS    2025250    183200   15.9400  146.1100       7.6       314       862        91
VIS    2025250    183200   15.9600  146.0400       9.5       308       953        96
VIS    2025250    183200   15.9400  146.0000       9.7       308       942        94
VIS    2025250    183200   15.9400  145.9800      10.7       309       943        97
VIS    2025250    183200   15.9600  145.8900       9.9       316       992        91
VIS    2025250    183200   15.9200  142.3300       7.6       182       927        99
VIS    2025250    183200   15.9400  142.2500       7.7       177       917        93
VIS    2025250    183200   15.9300  142.2000       7.5       179       911        94
VIS    2025250    183200   15.9600  150.2100       8.4        32       995        93
VIS    2025250    183200   15.9600  150.1800       8.4        28       981        95
VIS    2025250    183200   15.9800  150.1800       8.4        28       991        95
VIS    2025250    183200   15.9600  150.1400       8.4        22       960        95
VIS    2025250    183200   15.9600  149.8100       7.3        13       979        91
VIS    2025250    183200   15.9600  149.8000       7.3        13       980        91
VIS    2025250    183200   15.9500  149.7700       7.2        14       971        95
VIS    2025250    183200   15.9700  149.7400       6.5        16       957        95
VIS    2025250    183200   15.9700  149.7100       7.5         9       967        95
VIS    2025250    183200   15.9400  148.5100       6.2       358       989        98
VIS    2025250    183200   15.9600  148.4800       7.4       360       980        92
VIS    2025250    183200   15.9400  148.4600       7.2         2       980        91
VIS    2025250    183200   15.9500  148.4400       5.7         8       970        90
VIS    2025250    183200   15.9600  148.3600       7.6        18       837        92
VIS    2025250    183200   15.9400  148.3400       7.3        18       835        92
VIS    2025250    183200   15.9500  148.2600       8.5        20       824        90
VIS    2025250    183200   15.9500  148.2400       8.4        18       830        92
VIS    2025250    183200   15.9400  148.2100       8.5        20       906        92
VIS    2025250    183200   15.9400  148.1900       8.6        19       904        92
VIS    2025250    183200   15.9500  148.1600       8.3        14       903        93
VIS    2025250    183200   15.9400  148.1500       8.2        15       903        95
VIS    2025250    183200   15.9300  148.1200       7.8        17       903        93
VIS    2025250    183200   15.9400  148.1100       8.0        13       903        94
VIS    2025250    183200   15.9500  148.0600       8.7         9       905        93
VIS    2025250    183200   15.9400  148.0400       8.5        12       904        93
VIS    2025250    183200   15.9400  148.0300       8.4        12       904        94
VIS    2025250    183200   15.9400  147.9900       8.0        16       903        93
VIS    2025250    183200   15.9300  147.9600       7.7        18       899        91
VIS    2025250    183200   15.9400  147.9500       7.8        20       901        90
VIS    2025250    183200   15.9500  147.8600       7.9         3       935        90
VIS    2025250    183200   15.9400  147.8200       7.8       357       964        97
VIS    2025250    183200   15.9400  147.7800       7.6       351       949        91
VIS    2025250    183200   15.9400  147.7700       7.6       351       949        90
VIS    2025250    183200   15.9400  147.7200       7.9       356       933        90
VIS    2025250    183200   15.9400  147.6700       7.5       351       926        94
VIS    2025250    183200   15.9300  147.6600       7.5       350       926        92
VIS    2025250    183200   15.9300  147.6400       7.8       351       918        92
VIS    2025250    183200   15.9300  147.6000       8.0       352       886        92
VIS    2025250    183200   15.9300  147.5900       7.9       353       886        92
VIS    2025250    183200   15.9300  147.5300       7.4       359       890        90
VIS    2025250    183200   15.9400  147.5100       7.4       358       892        92
VIS    2025250    183200   15.9300  147.4900       7.3       355       900        92
VIS    2025250    183200   15.9400  147.4000       7.3       349       906        90
VIS    2025250    183200   15.9500  147.2600       6.6       352       883        91
VIS    2025250    183200   15.9400  147.2400       7.0       352       883        94
VIS    2025250    183200   15.9400  147.2300       7.2       350       880        94
VIS    2025250    183200   15.9400  147.0800       7.0       342       982        90
VIS    2025250    183200   15.9400  146.9800       6.7       341       880        93
VIS    2025250    183200   15.9400  146.9600       6.7       339       872        91
VIS    2025250    183200   15.9300  146.9400       6.9       340       871        90
VIS    2025250    183200   15.9200  146.5500       7.3       331       877        90
VIS    2025250    183200   15.9400  146.5200       8.4       328       905        94
VIS    2025250    183200   15.9300  146.3900       8.2       314       919        91
VIS    2025250    183200   15.9400  146.3700       7.6       319       892        90
VIS    2025250    183200   15.9200  146.1800       9.3       313       891        90
VIS    2025250    183200   15.9200  146.1600       8.9       313       891        94
VIS    2025250    183200   15.9300  146.1500       8.6       315       906        97
VIS    2025250    183200   15.9400  146.1100       7.8       314       862        93
VIS    2025250    183200   15.9300  146.1000       7.7       314       862        93
VIS    2025250    183200   15.9300  146.0700       8.8       311       904        92
VIS    2025250    183200   15.9200  146.0500       8.9       308       904        92
VIS    2025250    183200   15.9200  146.0300       9.2       308       923        95
VIS    2025250    183200   15.9000  142.3400       7.5       182       913        97
VIS    2025250    183200   15.8900  142.3400       7.3       183       913        94
VIS    2025250    183200   15.9100  142.2200       7.7       179       923        91
VIS    2025250    183200   15.9500  150.2100       8.4        32       992        93
VIS    2025250    183200   15.9500  150.2000       8.3        32       990        92
VIS    2025250    183200   15.9400  150.1800       8.4        27       973        94
VIS    2025250    183200   15.9500  150.1400       8.3        23       955        95
VIS    2025250    183200   15.9400  150.1300       8.4        21       960        95
VIS    2025250    183200   15.9300  149.8300       7.1        12       986        95
VIS    2025250    183200   15.9400  149.7900       6.9        14       980        94
VIS    2025250    183200   15.9300  149.7800       7.0        14       980        95
VIS    2025250    183200   15.9300  149.7500       7.0        13       964        95
VIS    2025250    183200   15.9300  149.7300       7.3        11       959        96
VIS    2025250    183200   15.9100  148.5300       6.3         8       987        96
VIS    2025250    183200   15.9300  148.5100       5.8         1       991        97
VIS    2025250    183200   15.9300  148.4800       6.4         0       993        91
VIS    2025250    183200   15.9300  148.4600       7.0       359       993        91
VIS    2025250    183200   15.9100  148.3500       6.5        15       837        93
VIS    2025250    183200   15.9100  148.3300       7.2        20       835        91
VIS    2025250    183200   15.9200  148.3000       8.1        21       828        93
VIS    2025250    183200   15.9100  148.3000       8.4        22       829        92
VIS    2025250    183200   15.9300  148.2700       8.7        19       829        91
VIS    2025250    183200   15.9200  148.2500       7.8        23       831        91
VIS    2025250    183200   15.9200  148.2000       7.6        18       906        91
VIS    2025250    183200   15.9300  148.1600       8.0        16       903        95
VIS    2025250    183200   15.9200  148.1500       7.8        18       903        95
VIS    2025250    183200   15.9300  148.1200       7.8        17       903        94
VIS    2025250    183200   15.9100  148.1000       7.7        14       903        92
VIS    2025250    183200   15.9200  148.0600       7.9         6       902        94
VIS    2025250    183200   15.9200  148.0500       7.8         8       902        95
VIS    2025250    183200   15.9100  148.0300       7.8        13       902        93
VIS    2025250    183200   15.9100  147.9900       7.9        13       900        91
VIS    2025250    183200   15.9100  147.9800       7.9        13       900        92
VIS    2025250    183200   15.9200  147.9500       7.6        17       899        93
VIS    2025250    183200   15.9100  147.9300       7.6         9       899        97
VIS    2025250    183200   15.9100  147.9100       7.8         4       905        96
VIS    2025250    183200   15.9200  147.8700       8.3         3       914        95
VIS    2025250    183200   15.9100  147.8600       8.0         3       916        96
VIS    2025250    183200   15.9100  147.8300       7.1         1       925        98
VIS    2025250    183200   15.9200  147.7800       7.9       349       947        91
VIS    2025250    183200   15.9200  147.7500       7.9       350       951        90
VIS    2025250    183200   15.9300  147.6500       7.6       350       925        93
VIS    2025250    183200   15.9200  147.6300       7.8       352       908        92
VIS    2025250    183200   15.9200  147.6000       7.8       353       900        93
VIS    2025250    183200   15.9300  147.6000       7.9       353       886        93
VIS    2025250    183200   15.9100  147.5500       7.1       359       886        90
VIS    2025250    183200   15.9200  147.5200       7.4       358       891        90
VIS    2025250    183200   15.9200  147.4300       7.3       348       935        90
VIS    2025250    183200   15.9000  147.3300       7.3       346       918        95
VIS    2025250    183200   15.9100  147.3100       7.8       342       898        94
VIS    2025250    183200   15.9100  147.3000       7.8       341       898        95
VIS    2025250    183200   15.9100  147.2700       7.5       346       882        94
VIS    2025250    183200   15.9000  147.2400       8.4       349       878        92
VIS    2025250    183200   15.9200  147.2200       7.7       349       878        91
VIS    2025250    183200   15.9200  147.1700       7.0       349       870        92
VIS    2025250    183200   15.9200  147.1500       6.9       351       874        91
VIS    2025250    183200   15.9000  147.1100       6.5       353       874        90
VIS    2025250    183200   15.9100  147.0700       7.1       342       975        91
VIS    2025250    183200   15.9100  146.9900       7.1       343       957        92
VIS    2025250    183200   15.9100  146.9900       7.0       343       938        92
VIS    2025250    183200   15.9000  146.9500       6.4       339       868        91
VIS    2025250    183200   15.9000  146.9400       6.4       338       868        91
VIS    2025250    183200   15.9000  146.9100       6.8       341       861        96
VIS    2025250    183200   15.9000  146.8900       6.9       344       861        97
VIS    2025250    183200   15.9000  146.8600       6.5       347       858        94
VIS    2025250    183200   15.8900  146.2600       7.3       321       895        91
VIS    2025250    183200   15.8900  146.1800       9.6       315       893        94
VIS    2025250    183200   15.8900  146.1500       9.0       314       891        90
VIS    2025250    183200   15.8900  146.1400       8.7       316       870        94
VIS    2025250    183200   15.9100  146.1000       9.1       314       870        94
VIS    2025250    183200   15.8900  146.0900       9.2       311       890        95
VIS    2025250    183200   15.9100  146.0400       8.7       308       904        91
VIS    2025250    183200   15.9100  146.0000       9.2       309       911        93
VIS    2025250    183200   15.8900  145.8900       9.9       306       969        93
VIS    2025250    183200   15.8900  142.3300       7.2       183       913        91
VIS    2025250    183200   15.8700  142.2300       7.5       178       968        93
VIS    2025250    183200   15.8700  142.2200       7.5       177       968        94
VIS    2025250    183200   15.9200  150.2200       8.0        30       995        95
VIS    2025250    183200   15.9000  149.8600       7.9        12       991        91
VIS    2025250    183200   15.9200  149.8300       7.2        11       991        95
VIS    2025250    183200   15.9200  149.8100       7.2        13       986        95
VIS    2025250    183200   15.9000  149.7800       6.7        15       964        94
VIS    2025250    183200   15.9200  149.7500       7.0        13       964        94
VIS    2025250    183200   15.9200  149.7400       7.1        12       964        93
VIS    2025250    183200   15.8900  148.5900       6.0         8       986        94
VIS    2025250    183200   15.9100  148.5600       6.2         7       987        97
VIS    2025250    183200   15.9000  148.5300       6.2        12       969        95
VIS    2025250    183200   15.9000  148.4500       6.8       358       992        99
VIS    2025250    183200   15.8900  148.4500       6.6       360       963        98
VIS    2025250    183200   15.8900  148.3800       6.9        10       843        93
VIS    2025250    183200   15.9100  148.3500       6.5        16       837        93
VIS    2025250    183200   15.8900  148.3100       8.7        27       836        93
VIS    2025250    183200   15.9000  148.3000       8.6        27       832        91
VIS    2025250    183200   15.9100  148.1600       7.9        12       905        96
VIS    2025250    183200   15.9100  148.1600       7.9        14       905        95
VIS    2025250    183200   15.8900  148.1200       7.6        14       904        96
VIS    2025250    183200   15.9100  148.0900       7.8         9       903        94
VIS    2025250    183200   15.9000  148.0800       7.6         6       903        94
VIS    2025250    183200   15.9000  148.0500       7.5         7       901        93
VIS    2025250    183200   15.9000  148.0200       7.9        13       901        90
VIS    2025250    183200   15.9000  147.9800       8.1        11       900        92
VIS    2025250    183200   15.8800  147.9600       8.0         6       898        91
VIS    2025250    183200   15.9000  147.9200       7.6         5       900        97
VIS    2025250    183200   15.8900  147.9000       7.4         4       905        97
VIS    2025250    183200   15.8900  147.8700       7.5       358       912        93
VIS    2025250    183200   15.8800  147.8500       7.1       356       916        94
VIS    2025250    183200   15.8800  147.8400       6.9       356       921        96
VIS    2025250    183200   15.8900  147.7800       7.7       348       929        93
VIS    2025250    183200   15.8900  147.7600       7.6       349       931        91
VIS    2025250    183200   15.8900  147.7300       7.7       352       970        92
VIS    2025250    183200   15.8900  147.7200       7.6       353       970        92
VIS    2025250    183200   15.8900  147.6500       7.2       346       926        90
VIS    2025250    183200   15.8900  147.6500       7.3       346       918        95
VIS    2025250    183200   15.9000  147.6200       7.8       350       908        90
VIS    2025250    183200   15.9000  147.5900       7.5       353       900        90
VIS    2025250    183200   15.8900  147.5300       7.1       357       891        90
VIS    2025250    183200   15.8900  147.5200       7.2       355       891        91
VIS    2025250    183200   15.8800  147.4700       7.1       347       898        91
VIS    2025250    183200   15.8900  147.4500       7.1       345       959        94
VIS    2025250    183200   15.8800  147.4200       7.0       345       954        95
VIS    2025250    183200   15.8800  147.3400       7.0       348       931        94
VIS    2025250    183200   15.8900  147.3200       7.7       341       918        97
VIS    2025250    183200   15.9000  147.2400       8.5       349       888        91
VIS    2025250    183200   15.9000  147.1200       6.3       352       872        91
VIS    2025250    183200   15.9000  147.1100       6.4       352       872        91
VIS    2025250    183200   15.8900  147.0800       6.8       343       869        93
VIS    2025250    183200   15.8900  147.0700       6.8       341       871        92
VIS    2025250    183200   15.8800  146.8800       6.9       343       869        91
VIS    2025250    183200   15.8900  146.8700       6.8       343       861        97
VIS    2025250    183200   15.8800  146.8300       6.2       344       858        92
VIS    2025250    183200   15.8900  146.8200       6.0       345       858        92
VIS    2025250    183200   15.8700  146.7800       7.6       340       935        90
VIS    2025250    183200   15.8700  146.4200       7.2       323       870        92
VIS    2025250    183200   15.8700  146.3400       9.4       318       892        90
VIS    2025250    183200   15.8700  146.3200       9.5       318       899        95
VIS    2025250    183200   15.8700  146.2900       9.6       318       905        95
VIS    2025250    183200   15.8700  146.2500       8.8       318       902        99
VIS    2025250    183200   15.8700  146.2300       8.9       317       901        99
VIS    2025250    183200   15.8700  146.2100       9.2       320       901        98
VIS    2025250    183200   15.8700  146.1800       9.4       315       893        98
VIS    2025250    183200   15.8900  146.1600       9.1       314       891        91
VIS    2025250    183200   15.8900  146.1500       8.9       314       870        91
VIS    2025250    183200   15.8900  146.0900       9.2       310       890        90
VIS    2025250    183200   15.8700  145.9800       8.4       315       932        92
VIS    2025250    183200   15.8600  142.2200       7.3       177       968        95
VIS    2025250    183200   15.8500  142.1700       6.6       180       966        90
VIS    2025250    183200   15.9100  151.6300       7.5        73       981        90
VIS    2025250    183200   15.8900  149.8300       7.4        14       991        95
VIS    2025250    183200   15.8900  149.7800       6.8        14       962        95
VIS    2025250    183200   15.8900  148.5900       6.3         7       986        98
VIS    2025250    183200   15.8900  148.5800       5.9        11       986        94
VIS    2025250    183200   15.8800  148.5500       5.9        16       938        93
VIS    2025250    183200   15.8800  148.5300       6.1        16       926        91
VIS    2025250    183200   15.8800  148.4400       6.6         1       963        97
VIS    2025250    183200   15.8700  148.4300       7.2         2       962        95
VIS    2025250    183200   15.8800  148.4100       7.2         6       950        98
VIS    2025250    183200   15.8800  148.3700       6.6        11       841        94
VIS    2025250    183200   15.8800  148.3600       6.5        13       841        93
VIS    2025250    183200   15.8800  148.3200       8.4        26       840        91
VIS    2025250    183200   15.8700  148.2900       8.2        21       833        90
VIS    2025250    183200   15.8800  148.2500       7.7        27       832        92
VIS    2025250    183200   15.8600  148.2300       7.5        21       908        94
VIS    2025250    183200   15.8800  148.2100       7.0        20       908        92
VIS    2025250    183200   15.8800  148.1800       7.0         7       906        96
VIS    2025250    183200   15.8800  148.1600       7.2       358       905        92
VIS    2025250    183200   15.8600  148.1300       7.2         5       904        96
VIS    2025250    183200   15.8600  148.1000       7.5         6       904        96
VIS    2025250    183200   15.8600  148.1000       7.5         6       903        95
VIS    2025250    183200   15.8700  148.0700       7.4         7       901        95
VIS    2025250    183200   15.8600  148.0400       7.2        10       899        97
VIS    2025250    183200   15.8600  148.0100       7.3        11       898        98
VIS    2025250    183200   15.8800  147.9600       7.7         7       898        92
VIS    2025250    183200   15.8700  147.9300       7.1         9       895        93
VIS    2025250    183200   15.8700  147.9100       6.9         8       895        90
VIS    2025250    183200   15.8700  147.8900       7.1         3       899        93
VIS    2025250    183200   15.8800  147.8600       7.2       356       913        93
VIS    2025250    183200   15.8800  147.8300       6.9       354       921        94
VIS    2025250    183200   15.8700  147.8300       7.1       352       921        94
VIS    2025250    183200   15.8600  147.8000       7.1       350       927        95
VIS    2025250    183200   15.8600  147.7700       7.2       350       925        92
VIS    2025250    183200   15.8600  147.7500       7.4       348       923        98
VIS    2025250    183200   15.8600  147.7100       7.2       350       927        97
VIS    2025250    183200   15.8600  147.7100       7.0       350       926        96
VIS    2025250    183200   15.8700  147.6700       6.8       347       926        99
VIS    2025250    183200   15.8600  147.6500       7.2       344       909        99
VIS    2025250    183200   15.8800  147.6200       7.9       344       905        95
VIS    2025250    183200   15.8600  147.5600       7.0       350       898        90
VIS    2025250    183200   15.8700  147.5200       7.2       354       894        90
VIS    2025250    183200   15.8600  147.4900       7.0       350       886        94
VIS    2025250    183200   15.8800  147.4700       7.0       346       898        93
VIS    2025250    183200   15.8700  147.4400       7.1       343       909        97
VIS    2025250    183200   15.8700  147.3500       6.9       353       933        92
VIS    2025250    183200   15.8700  147.3300       7.2       343       952        95
VIS    2025250    183200   15.8700  147.1500       6.1       341       866        94
VIS    2025250    183200   15.8700  146.8500       7.0       345       862        92
VIS    2025250    183200   15.8700  146.8200       7.2       345       862        93
VIS    2025250    183200   15.8700  146.8000       7.6       342       907        90
VIS    2025250    183200   15.8600  146.4400       8.4       321       912        90
VIS    2025250    183200   15.8600  146.4100       8.8       320       908        91
VIS    2025250    183200   15.8700  146.3100       9.8       318       905        95
VIS    2025250    183200   15.8500  146.3000      10.4       317       912        94
VIS    2025250    183200   15.8600  146.2700       9.6       317       905        94
VIS    2025250    183200   15.8600  146.2500       8.8       318       905        93
VIS    2025250    183200   15.8600  146.2200       9.0       315       901        91
VIS    2025250    183200   15.8600  146.2100       8.8       314       893        94
VIS    2025250    183200   15.8700  149.7900       7.1        15       977        91
VIS    2025250    183200   15.8600  148.6100       7.0       359       991        97
VIS    2025250    183200   15.8500  148.5700       6.4        11       969        96
VIS    2025250    183200   15.8600  148.5600       6.3        11       969        96
VIS    2025250    183200   15.8500  148.3900       6.3        12       916        92
VIS    2025250    183200   15.8500  148.3500       6.8        15       841        97
VIS    2025250    183200   15.8500  148.3300       7.5        16       841        94
VIS    2025250    183200   15.8500  148.2800       7.4        10       831        91
VIS    2025250    183200   15.8500  148.2500       7.1         6       833        91
VIS    2025250    183200   15.8400  148.2100       6.8         8       908        92
VIS    2025250    183200   15.8400  148.1900       6.6         8       907        96
VIS    2025250    183200   15.8400  148.1600       6.8         1       905        96
VIS    2025250    183200   15.8400  148.1300       7.4         2       903        95
VIS    2025250    183200   15.8400  148.1200       7.5         3       903        94
VIS    2025250    183200   15.8600  148.1000       7.5         5       903        95
VIS    2025250    183200   15.8500  148.0700       7.3         8       901        97
VIS    2025250    183200   15.8500  148.0400       7.2         9       899        98
VIS    2025250    183200   15.8500  148.0100       7.2        12       898        99
VIS    2025250    183200   15.8400  147.9800       7.2        10       896        99
VIS    2025250    183200   15.8400  147.9600       7.0        10       894        98
VIS    2025250    183200   15.8400  147.9500       6.9        11       894        97
VIS    2025250    183200   15.8600  147.9200       6.9         8       895        90
VIS    2025250    183200   15.8500  147.7700       7.2       350       925        93
VIS    2025250    183200   15.8400  147.7400       7.5       348       923        93
VIS    2025250    183200   15.8300  147.7300       7.5       349       923        98
VIS    2025250    183200   15.8300  147.6600       7.3       340       924        99
VIS    2025250    183200   15.8500  147.6300       7.7       339       909        96
VIS    2025250    183200   15.8500  147.5700       7.4       343       898        90
VIS    2025250    183200   15.8500  147.5200       6.9       353       890        93
VIS    2025250    183200   15.8500  147.5000       6.8       352       881        94
VIS    2025250    183200   15.8300  147.4900       6.5       351       878        96
VIS    2025250    183200   15.8300  147.4500       6.5       347       885        96
VIS    2025250    183200   15.8300  147.4400       6.6       348       893        97
VIS    2025250    183200   15.8300  147.4100       6.7       350       906        92
VIS    2025250    183200   15.8300  147.3900       6.7       349       914        94
VIS    2025250    183200   15.8500  147.3600       7.1       353       931        91
VIS    2025250    183200   15.8300  147.1600       7.2       350       894        90
VIS    2025250    183200   15.8400  146.3000       8.8       320       908        92
VIS    2025250    183200   15.8500  149.8300       7.3        15       987        90
VIS    2025250    183200   15.8200  148.6100       7.2       359       991        98
VIS    2025250    183200   15.8200  148.5800       6.7         6       985        95
VIS    2025250    183200   15.8400  148.5600       6.6        11       925        94
VIS    2025250    183200   15.8200  148.4600       6.3         8       849        90
VIS    2025250    183200   15.8200  148.3400       6.9        11       844        90
VIS    2025250    183200   15.8200  148.3100       7.4         7       837        91
VIS    2025250    183200   15.8300  148.2100       6.7         7       907        93
VIS    2025250    183200   15.8300  148.1800       6.6         7       906        94
VIS    2025250    183200   15.8100  148.1600       7.1         7       905        96
VIS    2025250    183200   15.8300  148.1200       7.6         4       902        93
VIS    2025250    183200   15.8300  148.0900       7.7         5       901        93
VIS    2025250    183200   15.8300  148.0800       7.7         6       901        93
VIS    2025250    183200   15.8100  148.0600       7.5         9       900        96
VIS    2025250    183200   15.8300  148.0200       7.5        14       898        97
VIS    2025250    183200   15.8100  148.0000       7.1        16       896        97
VIS    2025250    183200   15.8100  147.9700       6.9         4       894        97
VIS    2025250    183200   15.8200  147.9500       6.9         7       894        98
VIS    2025250    183200   15.8100  147.9300       6.9         7       896        96
VIS    2025250    183200   15.8300  147.9100       6.9        10       892        97
VIS    2025250    183200   15.8100  147.8700       6.9         6       893        95
VIS    2025250    183200   15.8300  147.7300       7.4       349       920        98
VIS    2025250    183200   15.8100  147.6800       6.5       347       920        94
VIS    2025250    183200   15.8200  147.6600       7.1       340       924        99
VIS    2025250    183200   15.8100  147.6500       7.0       342       924        99
VIS    2025250    183200   15.8200  147.6100       7.5       340       910        96
VIS    2025250    183200   15.8200  147.5800       7.8       336       908        94
VIS    2025250    183200   15.8100  147.5700       7.6       337       908        96
VIS    2025250    183200   15.8100  147.5300       7.0       348       897        95
VIS    2025250    183200   15.8100  147.5200       6.9       350       897        95
VIS    2025250    183200   15.8100  147.4900       6.2       353       873        96
VIS    2025250    183200   15.8100  147.4800       6.0       352       872        96
VIS    2025250    183200   15.8300  147.4400       6.4       349       885        96
VIS    2025250    183200   15.8200  147.4200       6.6       353       893        94
VIS    2025250    183200   15.8200  147.4000       7.1       351       904        95
VIS    2025250    183200   15.8100  147.3700       7.4       348       925        97
VIS    2025250    183200   15.8200  147.1700       7.5       354       894        97
VIS    2025250    183200   15.8200  146.8700       7.3       338       945        91
VIS    2025250    183200   15.8200  146.8100       6.6       337       856        90
VIS    2025250    183200   15.8000  146.8000       7.0       329       859        93
VIS    2025250    183200   15.8000  146.7300       5.9       341       868        95
VIS    2025250    183200   15.8100  146.7200       6.2       340       869        94
VIS    2025250    183200   15.8000  146.6900       6.3       336       867        96
VIS    2025250    183200   15.8000  146.6600       7.6       333       979        95
VIS    2025250    183200   15.8100  146.2200       8.1       319       865        96
VIS    2025250    183200   15.7700  142.2600       6.5       184       921        94
VIS    2025250    183200   15.7700  142.2500       6.5       184       921        91
VIS    2025250    183200   15.8100  148.5800       6.7         5       985        90
VIS    2025250    183200   15.7900  148.5300       7.4        11       884        90
VIS    2025250    183200   15.8100  148.5000       7.3         8       844        91
VIS    2025250    183200   15.8000  148.4700       6.4        10       847        92
VIS    2025250    183200   15.8100  148.3300       7.2         6       844        90
VIS    2025250    183200   15.8100  148.1700       7.0         7       906        94
VIS    2025250    183200   15.8000  148.1500       6.9        14       906        91
VIS    2025250    183200   15.7900  148.1400       6.9        16       906        95
VIS    2025250    183200   15.8000  148.1000       7.4        11       901        93
VIS    2025250    183200   15.7900  148.0700       7.5        13       901        94
VIS    2025250    183200   15.8000  148.0500       7.3        12       898        96
VIS    2025250    183200   15.8000  148.0400       7.1        14       898        94
VIS    2025250    183200   15.8100  148.0000       7.1        13       895        97
VIS    2025250    183200   15.8000  147.9900       7.0         5       894        95
VIS    2025250    183200   15.7900  147.9500       7.0         1       897        93
VIS    2025250    183200   15.8000  147.9500       7.0         4       896        96
VIS    2025250    183200   15.7900  147.9100       7.0       360       897        95
VIS    2025250    183200   15.8100  147.8800       7.0         4       894        96
VIS    2025250    183200   15.8100  147.8700       6.7         4       893        95
VIS    2025250    183200   15.8100  147.7600       7.1       356       906        91
VIS    2025250    183200   15.8100  147.6600       6.1       349       924        92
VIS    2025250    183200   15.8000  147.5400       7.3       344       903        94
VIS    2025250    183200   15.8000  147.5100       6.9       353       882        96
VIS    2025250    183200   15.8000  147.5100       6.8       354       880        96
VIS    2025250    183200   15.7800  147.4700       6.0       352       870        93
VIS    2025250    183200   15.7900  147.4600       5.7       351       870        92
VIS    2025250    183200   15.7800  147.4000       7.3       349       882        97
VIS    2025250    183200   15.7900  147.3700       7.5       348       905        96
VIS    2025250    183200   15.7900  147.3500       7.1       348       939        96
VIS    2025250    183200   15.8000  147.3400       7.1       350       960        91
VIS    2025250    183200   15.7800  147.1800       6.8       357       912        93
VIS    2025250    183200   15.7800  147.1700       6.6       360       907        94
VIS    2025250    183200   15.8000  147.1400       6.8         2       909        94
VIS    2025250    183200   15.7900  147.1200       6.3       360       941        92
VIS    2025250    183200   15.7900  146.7800       6.8       333       863        93
VIS    2025250    183200   15.7800  146.7600       6.8       333       868        90
VIS    2025250    183200   15.7800  146.7200       6.3       341       862        93
VIS    2025250    183200   15.7700  146.2900       8.8       314       879        90
VIS    2025250    183200   15.7800  146.2100       9.0       316       856        90
VIS    2025250    183200   15.7500  142.2700       6.6       181       903        90
VIS    2025250    183200   15.7500  142.1700       7.0       175       944        98
VIS    2025250    183200   15.8000  150.6300       7.7        36       996        91
VIS    2025250    183200   15.7800  149.3800       9.0         9       995        95
VIS    2025250    183200   15.7900  148.6000       7.2         4       989        90
VIS    2025250    183200   15.7800  148.5300       7.6        10       884        91
VIS    2025250    183200   15.7700  148.5000       7.5        12       862        96
VIS    2025250    183200   15.7700  148.4900       7.4        12       852        96
VIS    2025250    183200   15.7800  148.4700       6.9        11       849        94
VIS    2025250    183200   15.7700  148.3800       6.1        17       858        94
VIS    2025250    183200   15.7800  148.2400       7.6        10       906        90
VIS    2025250    183200   15.7900  148.1500       7.1        16       907        90
VIS    2025250    183200   15.7800  148.1200       6.9        21       906        93
VIS    2025250    183200   15.7800  148.0600       7.4        15       900        94
VIS    2025250    183200   15.7800  147.9700       6.7         0       896        91
VIS    2025250    183200   15.7800  147.9500       6.8         1       897        92
VIS    2025250    183200   15.7700  147.9000       7.2       355       905        90
VIS    2025250    183200   15.7600  147.8700       6.9       351       899        90
VIS    2025250    183200   15.7600  147.7800       6.8         2       903        90
VIS    2025250    183200   15.7800  147.7500       6.8       354       900        91
VIS    2025250    183200   15.7800  147.7200       7.1       352       880        94
VIS    2025250    183200   15.7600  147.6800       6.9       355       937        94
VIS    2025250    183200   15.7600  147.6700       6.7       356       937        93
VIS    2025250    183200   15.7700  147.5300       6.8       342       922        91
VIS    2025250    183200   15.7800  147.5100       6.5       351       900        93
VIS    2025250    183200   15.7700  147.4800       6.3       353       882        94
VIS    2025250    183200   15.7800  147.4700       6.0       352       872        91
VIS    2025250    183200   15.7700  147.3900       7.4       348       882        97
VIS    2025250    183200   15.7800  147.3700       7.4       348       902        98
VIS    2025250    183200   15.7600  147.3500       6.8       343       902        97
VIS    2025250    183200   15.7600  147.3200       7.2       336       965        98
VIS    2025250    183200   15.7600  147.3100       7.3       335       965        97
VIS    2025250    183200   15.7600  147.2500       6.9       337       945        96
VIS    2025250    183200   15.7800  147.1700       6.4       359       912        93
VIS    2025250    183200   15.7800  147.1600       6.4       359       907        95
VIS    2025250    183200   15.7600  146.2300       8.9       315       865        92
VIS    2025250    183200   15.7400  142.2700       6.6       181       903        90
VIS    2025250    183200   15.7300  142.1700       7.2       179       936        98
VIS    2025250    183200   15.7200  142.1700       7.2       179       930        97
VIS    2025250    183200   15.7500  149.3700       8.5         7       991        91
VIS    2025250    183200   15.7600  149.3500       8.8         8       991        94
VIS    2025250    183200   15.7700  148.5600       7.3        18       944        90
VIS    2025250    183200   15.7600  148.5300       7.5        12       901        94
VIS    2025250    183200   15.7600  148.5100       7.5        10       885        96
VIS    2025250    183200   15.7600  148.4800       7.1        10       880        96
VIS    2025250    183200   15.7500  148.4600       7.2         2       916        91
VIS    2025250    183200   15.7500  148.4500       7.4         1       930        92
VIS    2025250    183200   15.7600  148.3900       6.1        12       894        92
VIS    2025250    183200   15.7500  148.3600       5.9        20       855        94
VIS    2025250    183200   15.7500  148.3300       7.1        12       851        93
VIS    2025250    183200   15.7400  148.3200       7.7        12       855        95
VIS    2025250    183200   15.7400  148.2800       8.0        13       851        95
VIS    2025250    183200   15.7500  148.1800       7.7        17       907        91
VIS    2025250    183200   15.7400  148.1800       8.0        16       907        94
VIS    2025250    183200   15.7600  148.1100       6.8        23       906        90
VIS    2025250    183200   15.7500  147.9900       8.8         7       898        93
VIS    2025250    183200   15.7400  147.9400       7.1         6       897        94
VIS    2025250    183200   15.7400  147.8400       6.7       349       896        91
VIS    2025250    183200   15.7500  147.8100       6.5         2       898        91
VIS    2025250    183200   15.7500  147.7800       7.0         0       903        90
VIS    2025250    183200   15.7400  147.7700       7.1       357       903        91
VIS    2025250    183200   15.7600  147.6700       6.9       354       937        94
VIS    2025250    183200   15.7600  147.4900       6.7       353       900        91
VIS    2025250    183200   15.7400  147.3800       7.0       345       895        94
VIS    2025250    183200   15.7500  147.3400       6.7       340       912        98
VIS    2025250    183200   15.7500  147.3300       6.7       339       912        95
VIS    2025250    183200   15.7400  147.2900       7.3       335       912        92
VIS    2025250    183200   15.7300  147.2800       7.2       334       912        92
VIS    2025250    183200   15.7300  147.2600       6.7       335       930        95
VIS    2025250    183200   15.7500  149.3700       8.5         7       991        91
VIS    2025250    183200   15.7400  149.3500       8.4         7       959        91
VIS    2025250    183200   15.7400  148.5800       7.7        17       958        96
VIS    2025250    183200   15.7300  148.5700       7.1        22       952        91
VIS    2025250    183200   15.7300  148.5300       6.8        17       941        90
VIS    2025250    183200   15.7300  148.4800       7.0         2       916        93
VIS    2025250    183200   15.7200  148.4200       7.3         3       955        98
VIS    2025250    183200   15.7200  148.3400       6.6        17       900        95
VIS    2025250    183200   15.7300  148.3200       7.7        12       898        98
VIS    2025250    183200   15.7200  148.2900       7.7        13       899        99
VIS    2025250    183200   15.7200  148.2800       7.7        13       898        99
VIS    2025250    183200   15.7200  148.2400       7.7        10       849        91
VIS    2025250    183200   15.7300  148.1000       6.5        23       847        90
VIS    2025250    183200   15.7100  147.6600       6.6       353       927        96
VIS    2025250    183200   15.7100  147.6500       6.5       354       927        97
VIS    2025250    183200   15.7100  147.3400       7.2       335       906        91
VIS    2025250    183200   15.7300  147.2800       6.9       334       901        92
VIS    2025250    183200   15.7300  147.2500       6.2       338       908        92
VIS    2025250    183200   15.7200  147.2300       5.7       344       906        92
VIS    2025250    183200   15.7100  146.9600       7.2       337       954        99
VIS    2025250    183200   15.7300  146.7800       6.6       336       953        90
VIS    2025250    183200   15.7100  146.7400       6.3       345       926        91
VIS    2025250    183200   15.7000  146.6700       6.0       336       979        91
VIS    2025250    183200   15.7100  146.6400       7.7       335       979        97
VIS    2025250    183200   15.7100  149.4100       7.7         8       992        93
VIS    2025250    183200   15.7100  149.3900       7.5         7       991        90
VIS    2025250    183200   15.7100  149.3400       7.8         6       941        93
VIS    2025250    183200   15.7100  149.3300       7.9         5       941        93
VIS    2025250    183200   15.7000  148.4900       7.1         2       923        91
VIS    2025250    183200   15.7100  148.3300       7.4        16       900        91
VIS    2025250    183200   15.7000  148.3000       7.6        12       900        96
VIS    2025250    183200   15.7000  148.2800       7.6        12       900        95
VIS    2025250    183200   15.7100  148.2600       7.5        14       898        96
VIS    2025250    183200   15.7000  148.2400       7.6        12       852        90
VIS    2025250    183200   15.6900  148.2200       7.5        17       845        91
VIS    2025250    183200   15.7100  148.2000       7.8        17       840        90
VIS    2025250    183200   15.6900  147.6900       6.9       349       906        96
VIS    2025250    183200   15.6900  147.6800       6.9       347       907        95
VIS    2025250    183200   15.7000  147.6500       6.6       351       927        97
VIS    2025250    183200   15.6900  147.6300       6.9       350       957        98
VIS    2025250    183200   15.7100  147.3300       7.2       334       906        91
VIS    2025250    183200   15.6800  147.1500       5.8       339       921        94
VIS    2025250    183200   15.6800  147.1400       5.8       338       926        95
VIS    2025250    183200   15.6800  146.9600       6.4       341       948        96
VIS    2025250    183200   15.6900  146.9500       7.0       335       954        98
VIS    2025250    183200   15.7000  146.7500       6.4       339       926        94
VIS    2025250    183200   15.6900  146.7300       6.9       337       926        97
VIS    2025250    183200   15.6800  146.6600       7.6       330       973        93
VIS    2025250    183200   15.6900  146.6200       6.7       337       948        91
VIS    2025250    183200   15.6800  146.5600       7.4       329       975        98
VIS    2025250    183200   15.6800  146.5400       7.8       327       961        99
VIS    2025250    183200   15.6800  146.5000       6.0       342       924        90
VIS    2025250    183200   15.6900  146.4800       8.7       318       961        95
VIS    2025250    183200   15.6600  142.2100       6.5       173       917        95
VIS    2025250    183200   15.6900  149.4200       7.4        11       999        92
VIS    2025250    183200   15.6900  149.4000       7.5        10       993        91
VIS    2025250    183200   15.6700  148.5500       7.4         5       980        91
VIS    2025250    183200   15.6900  148.4900       7.2         2       926        94
VIS    2025250    183200   15.6800  148.3400       6.6        13       902        91
VIS    2025250    183200   15.6900  148.3000       7.1        16       900        92
VIS    2025250    183200   15.6900  148.2800       7.2        13       900        92
VIS    2025250    183200   15.6900  148.2200       7.3        17       852        92
VIS    2025250    183200   15.6800  148.1900       7.5        19       845        93
VIS    2025250    183200   15.6700  147.7900       6.8         1       877        92
VIS    2025250    183200   15.6800  147.7200       6.6       359       900        93
VIS    2025250    183200   15.6700  147.6900       6.8       354       905        95
VIS    2025250    183200   15.6800  147.6700       7.2       346       913        95
VIS    2025250    183200   15.6800  147.6300       7.1       349       938        97
VIS    2025250    183200   15.6800  147.6300       7.2       349       938        96
VIS    2025250    183200   15.6600  147.6000       7.3       354       953        93
VIS    2025250    183200   15.6600  147.5600       8.6       351       961        91
VIS    2025250    183200   15.6800  147.1300       5.8       339       935        91
VIS    2025250    183200   15.6600  146.9600       6.0       341       933        91
VIS    2025250    183200   15.6600  146.9500       6.0       339       931        91
VIS    2025250    183200   15.6600  146.9100       6.7       336       949        98
VIS    2025250    183200   15.6600  146.8900       6.8       331       949        97
VIS    2025250    183200   15.6600  146.8700       7.0       324       958        96
VIS    2025250    183200   15.6600  146.8300       7.9       321       952        92
VIS    2025250    183200   15.6600  146.8300       7.8       322       952        90
VIS    2025250    183200   15.6700  146.7200       6.5       335       913        96
VIS    2025250    183200   15.6600  146.6800       7.2       331       940        90
VIS    2025250    183200   15.6600  146.5700       6.8       329       966        93
VIS    2025250    183200   15.6600  146.5600       6.9       329       961        96
VIS    2025250    183200   15.6600  146.5300       6.1       330       924        97
VIS    2025250    183200   15.6700  146.5100       5.8       337       924        95
VIS    2025250    183200   15.6600  146.4500       8.5       320       940        97
VIS    2025250    183200   15.6500  146.4400       8.8       319       899        92
VIS    2025250    183200   15.6500  146.4200       8.4       317       932        94
VIS    2025250    183200   15.6500  146.3800       8.0       308       943        95
VIS    2025250    183200   15.6500  146.3500       8.1       311       958        93
VIS    2025250    183200   15.6500  146.3500       8.0       312       952        92
VIS    2025250    183200   15.6300  142.2400       7.1       171       917        91
VIS    2025250    183200   15.6300  142.2100       6.5       176       909        95
VIS    2025250    183200   15.6300  142.1800       6.4       185       909        96
VIS    2025250    183200   15.6300  142.1700       6.4       184       909        91
VIS    2025250    183200   15.6800  149.4200       7.4        10       999        93
VIS    2025250    183200   15.6600  149.4000       7.5         8       994        96
VIS    2025250    183200   15.6600  149.3900       7.6         8       994        96
VIS    2025250    183200   15.6500  148.5400       7.5         3       980        91
VIS    2025250    183200   15.6600  148.5200       7.0         5       980        97
VIS    2025250    183200   15.6600  148.3500       6.7         7       904        93
VIS    2025250    183200   15.6700  148.3400       6.6        11       902        92
VIS    2025250    183200   15.6500  148.1500       7.2        10       839        91
VIS    2025250    183200   15.6600  147.7800       6.7         0       848        90
VIS    2025250    183200   15.6600  147.6700       6.9       345       907        93
VIS    2025250    183200   15.6600  147.6600       6.8       345       907        93
VIS    2025250    183200   15.6400  147.6400       6.7       350       908        92
VIS    2025250    183200   15.6500  147.6200       7.0       354       927        93
VIS    2025250    183200   15.6500  147.5900       7.9       358       947        90
VIS    2025250    183200   15.6400  147.5500       7.8       347       947        95
VIS    2025250    183200   15.6500  147.5300       7.8       344       950        92
VIS    2025250    183200   15.6400  147.5000       7.3       354       952        90
VIS    2025250    183200   15.6400  147.4900       7.5       359       952        90
VIS    2025250    183200   15.6400  147.3000       6.9       347       961        90
VIS    2025250    183200   15.6400  147.1300       6.6       348       957        90
VIS    2025250    183200   15.6400  147.1000       6.7       347       964        93
VIS    2025250    183200   15.6300  146.9100       5.6       336       928        91
VIS    2025250    183200   15.6300  146.8700       7.3       323       944        96
VIS    2025250    183200   15.6300  146.8600       7.4       321       944        97
VIS    2025250    183200   15.6400  146.8400       6.9       321       939        95
VIS    2025250    183200   15.6400  146.5300       6.3       327       910        98
VIS    2025250    183200   15.6400  146.4600       8.0       321       899        93
VIS    2025250    183200   15.6400  146.3900       8.1       312       930        93
VIS    2025250    183200   15.6300  146.3600       8.2       309       927        93
VIS    2025250    183200   15.6200  142.5000       7.1       189       837        95
VIS    2025250    183200   15.6100  142.4900       6.9       190       889        95
VIS    2025250    183200   15.6200  142.2400       7.2       170       917        90
VIS    2025250    183200   15.6300  149.4300       7.3         8       998        98
VIS    2025250    183200   15.6500  149.4100       7.3         9       993        97
VIS    2025250    183200   15.6500  149.4000       7.4         7       993        97
VIS    2025250    183200   15.6400  149.3700       7.8         4       993        94
VIS    2025250    183200   15.6400  149.3500       8.3         5       982        93
VIS    2025250    183200   15.6400  149.3100       8.0         8       948        94
VIS    2025250    183200   15.6500  149.3000       8.2         9       948        94
VIS    2025250    183200   15.6200  148.2300       7.3        21       872        93
VIS    2025250    183200   15.6200  148.2100       7.0        24       867        92
VIS    2025250    183200   15.6300  148.1800       6.9        21       856        96
VIS    2025250    183200   15.6300  148.1500       6.8        15       845        93
VIS    2025250    183200   15.6300  148.1000       6.6        16       839        92
VIS    2025250    183200   15.6200  148.0800       6.5        11       836        94
VIS    2025250    183200   15.6300  148.0700       6.5        11       831        91
VIS    2025250    183200   15.6400  147.6800       6.6       354       907        94
VIS    2025250    183200   15.6300  147.6400       6.3       353       908        92
VIS    2025250    183200   15.6300  147.6100       7.2       353       939        90
VIS    2025250    183200   15.6200  147.5800       8.0       356       948        91
VIS    2025250    183200   15.6200  147.5500       7.6       347       942        94
VIS    2025250    183200   15.6400  147.5400       7.4       344       944        94
VIS    2025250    183200   15.6300  147.5000       7.4       358       952        93
VIS    2025250    183200   15.6300  147.4900       7.6         2       952        92
VIS    2025250    183200   15.6200  147.4500       7.6       352       952        96
VIS    2025250    183200   15.6200  147.1300       6.8       345       941        90
VIS    2025250    183200   15.6300  146.8600       7.4       322       938        97
VIS    2025250    183200   15.6200  146.8500       7.6       325       930        93
VIS    2025250    183200   15.6000  142.5100       6.9       188       832        91
VIS    2025250    183200   15.5900  142.2700       6.1       178       882        94
VIS    2025250    183200   15.6200  149.4800       8.3         9       998        95
VIS    2025250    183200   15.6100  149.4600       7.6        11       997        96
VIS    2025250    183200   15.6300  149.4400       7.5         9       998        98
VIS    2025250    183200   15.6300  149.4200       7.3         9       998        98
VIS    2025250    183200   15.6200  149.3800       7.7         3       982        93
VIS    2025250    183200   15.6200  149.3300       7.5         8       968        96
VIS    2025250    183200   15.6200  149.3200       7.5         8       948        95
VIS    2025250    183200   15.6200  149.2900       7.7         7       948        94
VIS    2025250    183200   15.6000  148.2300       6.4        21       885        90
VIS    2025250    183200   15.6000  148.1100       7.2        12       843        91
VIS    2025250    183200   15.6200  148.0800       6.8        10       839        93
VIS    2025250    183200   15.6100  148.0600       7.0         8       836        91
VIS    2025250    183200   15.6000  147.6800       6.4       353       912        91
VIS    2025250    183200   15.5900  147.6800       6.5       353       917        91
VIS    2025250    183200   15.5900  147.6500       6.4       350       929        91
VIS    2025250    183200   15.6100  147.5600       7.6       351       942        95
VIS    2025250    183200   15.6100  147.5600       7.5       349       939        95
VIS    2025250    183200   15.6000  147.5100       6.8       355       932        92
VIS    2025250    183200   15.5900  147.4900       6.8       359       936        95
VIS    2025250    183200   15.6000  147.4600       7.1       351       944        97
VIS    2025250    183200   15.5900  147.4600       7.0       351       944        97
VIS    2025250    183200   15.6000  147.4300       7.2       349       947        94
VIS    2025250    183200   15.5900  147.4100       7.3       353       952        94
VIS    2025250    183200   15.6100  146.8600       7.8       332       930        91
VIS    2025250    183200   15.5600  142.2200       6.8       184       988        95
VIS    2025250    183200   15.6000  149.4300       7.7         8       997        94
VIS    2025250    183200   15.6000  149.4200       7.7         7       997        94
VIS    2025250    183200   15.5900  149.3600       7.5        10       987        94
VIS    2025250    183200   15.5800  149.3300       6.9        13       956        97
VIS    2025250    183200   15.5900  149.3000       7.2        11       943        95
VIS    2025250    183200   15.5700  148.3000       6.8        16       937        97
VIS    2025250    183200   15.5700  148.1100       7.3        17       849        92
VIS    2025250    183200   15.5900  148.1000       7.2        11       841        91
VIS    2025250    183200   15.5800  148.0600       7.3        12       841        91
VIS    2025250    183200   15.5700  147.7400       7.4         6       896        91
VIS    2025250    183200   15.5800  147.7200       6.9         1       897        90
VIS    2025250    183200   15.5900  147.6800       6.5       352       909        90
VIS    2025250    183200   15.5900  147.6500       6.4       350       929        92
VIS    2025250    183200   15.5900  147.6400       6.3       350       929        91
VIS    2025250    183200   15.5800  147.5900       6.4       353       918        92
VIS    2025250    183200   15.5800  147.5700       6.7       350       924        94
VIS    2025250    183200   15.5700  147.5300       6.3       353       917        94
VIS    2025250    183200   15.5700  147.5000       6.3       358       920        94
VIS    2025250    183200   15.5700  147.4800       6.1       355       929        95
VIS    2025250    183200   15.5900  147.4500       6.9       351       944        97
VIS    2025250    183200   15.5800  147.4500       6.7       350       947        96
VIS    2025250    183200   15.5700  147.4100       7.2       355       947        93
VIS    2025250    183200   15.5800  147.3800       7.2       345       952        98
VIS    2025250    183200   15.5800  147.3700       7.1       344       955        97
VIS    2025250    183200   15.5700  147.3100       6.8       341       966        99
VIS    2025250    183200   15.5700  147.2100       7.1       345       941        93
VIS    2025250    183200   15.5600  146.7000       7.9       331       947        98
VIS    2025250    183200   15.5700  146.6700       7.4       341       949        92
VIS    2025250    183200   15.5600  146.5700      10.3       328       962        96
VIS    2025250    183200   15.5700  146.4600       7.6       315       967        96
VIS    2025250    183200   15.5800  149.4900       8.0         8       994        90
VIS    2025250    183200   15.5800  149.4800       7.6        11       985        90
VIS    2025250    183200   15.5800  149.4300       7.7         9       997        90
VIS    2025250    183200   15.5800  149.3600       7.6        11       987        94
VIS    2025250    183200   15.5800  149.3600       7.5        11       987        93
VIS    2025250    183200   15.5700  149.3200       7.1        14       948        97
VIS    2025250    183200   15.5700  149.2800       7.1        10       934        90
VIS    2025250    183200   15.5700  148.3400       6.3        12       950        93
VIS    2025250    183200   15.5500  148.3100       6.9         9       950        99
VIS    2025250    183200   15.5600  148.2900       6.6        13       917        95
VIS    2025250    183200   15.5600  148.2800       6.6        11       917        97
VIS    2025250    183200   15.5700  148.1200       7.2        19       854        91
VIS    2025250    183200   15.5600  148.1000       7.3        18       849        94
VIS    2025250    183200   15.5500  148.0700       7.4        16       848        91
VIS    2025250    183200   15.5500  147.9200       7.9        15       877        92
VIS    2025250    183200   15.5500  147.8900       8.0        21       859        90
VIS    2025250    183200   15.5500  147.8700       7.8        21       865        91
VIS    2025250    183200   15.5600  147.7600       7.7        10       850        92
VIS    2025250    183200   15.5500  147.5000       6.0       360       921        93
VIS    2025250    183200   15.5600  147.4100       7.2       356       947        92
VIS    2025250    183200   15.5400  147.3800       6.7       352       925        97
VIS    2025250    183200   15.5400  147.3600       6.8       349       930        97
VIS    2025250    183200   15.5500  147.3200       7.0       345       942        98
VIS    2025250    183200   15.5600  147.3000       6.4       344       945        97
VIS    2025250    183200   15.5500  147.2800       6.2       358       944        92
VIS    2025250    183200   15.5400  147.0300       9.0       324       964        90
VIS    2025250    183200   15.5400  147.0300       9.2       330       964        97
VIS    2025250    183200   15.5400  147.0000       8.6       333       981        97
VIS    2025250    183200   15.5400  146.9800       7.5       337       978        98
VIS    2025250    183200   15.5400  146.6900       8.6       329       928        99
VIS    2025250    183200   15.5500  146.6800       8.3       332       934        99
VIS    2025250    183200   15.5500  146.6600       7.0       339       941        95
VIS    2025250    183200   15.5400  146.5700      10.1       322       941        90
VIS    2025250    183200   15.5400  146.5300       8.0       322       953        98
VIS    2025250    183200   15.5400  146.5200       7.6       323       949        92
VIS    2025250    183200   15.5300  146.2600       5.8       312       940        92
VIS    2025250    183200   15.5400  146.2200       6.5       288       968        92
VIS    2025250    183200   15.5400  146.1900       7.4       297       941        95
VIS    2025250    183200   15.5100  142.5500       8.0       180       964        91
VIS    2025250    183200   15.5300  142.4400       8.6       177       963        91
VIS    2025250    183200   15.5100  142.1700       5.7       186       994        94
VIS    2025250    183200   15.5500  150.9900       7.4        44       990        94
VIS    2025250    183200   15.5400  149.3400       8.1        13       983        95
VIS    2025250    183200   15.5400  149.3300       8.0        14       963        95
VIS    2025250    183200   15.5500  149.3000       7.1        12       938        93
VIS    2025250    183200   15.5500  148.2800       6.3        16       917        91
VIS    2025250    183200   15.5300  148.1600       7.5        19       880        92
VIS    2025250    183200   15.5300  148.1300       7.3        21       875        94
VIS    2025250    183200   15.5400  148.1200       7.2        22       870        94
VIS    2025250    183200   15.5400  148.0900       7.5        21       856        92
VIS    2025250    183200   15.5400  148.0700       7.6        19       855        90
VIS    2025250    183200   15.5400  148.0100       7.2        26       846        90
VIS    2025250    183200   15.5200  147.9500       7.2        22       863        90
VIS    2025250    183200   15.5400  147.9200       8.0        19       886        92
VIS    2025250    183200   15.5300  147.8700       8.2        23       906        92
VIS    2025250    183200   15.5300  147.8600       8.2        22       906        92
VIS    2025250    183200   15.5200  147.8200       8.1        14       909        94
VIS    2025250    183200   15.5400  147.8000       8.3        14       907        92
VIS    2025250    183200   15.5200  147.7700       8.0        14       907        93
VIS    2025250    183200   15.5200  147.7600       7.9        13       912        93
VIS    2025250    183200   15.5300  147.3900       6.1       353       920        95
VIS    2025250    183200   15.5300  147.3800       6.2       352       920        96
VIS    2025250    183200   15.5300  147.3500       6.5       347       927        95
VIS    2025250    183200   15.5200  147.0600       6.7       344       964        93
VIS    2025250    183200   15.5300  147.0300       8.7       326       964        98
VIS    2025250    183200   15.5100  146.9900       7.7       332       947        99
VIS    2025250    183200   15.5100  146.9700       7.4       335       957        99
VIS    2025250    183200   15.5100  146.9700       7.5       337       957        99
VIS    2025250    183200   15.5200  146.7100       7.3       326       924        94
VIS    2025250    183200   15.5200  146.6800       6.7       329       909        97
VIS    2025250    183200   15.5200  146.6700       6.7       333       914        94
VIS    2025250    183200   15.5300  146.5600       9.8       321       941        91
VIS    2025250    183200   15.5300  146.5600       9.5       321       940        92
VIS    2025250    183200   15.5100  146.2200       7.2       289       958        92
VIS    2025250    183200   15.5000  142.7000       7.3       184       931        91
VIS    2025250    183200   15.5000  142.6800       7.5       180       931        93
VIS    2025250    183200   15.5100  142.5700       7.9       181       964        91
VIS    2025250    183200   15.5300  149.3500       8.1        13       983        94
VIS    2025250    183200   15.5300  149.3200       7.9        15       971        96
VIS    2025250    183200   15.5300  149.3100       7.5        15       963        95
VIS    2025250    183200   15.5200  149.2700       7.5        12       971        96
VIS    2025250    183200   15.5100  149.2600       7.7        10       971        94
VIS    2025250    183200   15.5200  149.2400       7.7         7       988        92
VIS    2025250    183200   15.5200  148.5300       7.4         5       983        94
VIS    2025250    183200   15.5200  148.3200       7.0        13       954        93
VIS    2025250    183200   15.5200  148.3100       6.6        14       954        90
VIS    2025250    183200   15.5200  148.1800       7.9        25       894        90
VIS    2025250    183200   15.5200  148.1600       7.6        21       887        91
VIS    2025250    183200   15.5200  148.1200       8.0        24       878        91
VIS    2025250    183200   15.5100  147.9800       6.5        24       877        91
VIS    2025250    183200   15.5200  147.9300       8.1        26       877        90
VIS    2025250    183200   15.5100  147.8800       8.9        23       905        90
VIS    2025250    183200   15.5100  147.8500       8.1        17       906        90
VIS    2025250    183200   15.5100  147.8400       7.9        15       906        93
VIS    2025250    183200   15.5000  147.8100       8.0        14       907        92
VIS    2025250    183200   15.5000  147.8000       8.1        15       909        91
VIS    2025250    183200   15.5200  147.7600       7.9        12       912        94
VIS    2025250    183200   15.5200  147.7500       7.8        11       912        94
VIS    2025250    183200   15.4900  147.0300       7.2       325       943        97
VIS    2025250    183200   15.5000  147.0300       7.5       326       946        98
VIS    2025250    183200   15.4900  146.9900       7.1       333       947        98
VIS    2025250    183200   15.4600  142.7900       7.0       189       858        94
VIS    2025250    183200   15.4600  142.7600       6.9       187       870        95
VIS    2025250    183200   15.4600  142.7500       6.9       185       888        96
VIS    2025250    183200   15.4600  142.7100       6.9       188       935        98
VIS    2025250    183200   15.4700  142.6900       6.8       183       931        95
VIS    2025250    183200   15.4600  142.6700       6.9       190       880        94
VIS    2025250    183200   15.5100  149.3100       7.6        19       968        93
VIS    2025250    183200   15.5000  149.3000       7.6        18       968        95
VIS    2025250    183200   15.4900  149.2800       7.6        13       960        95
VIS    2025250    183200   15.4900  149.2500       7.8         9       970        95
VIS    2025250    183200   15.4900  148.5500       6.7         8       987        96
VIS    2025250    183200   15.4900  148.5200       7.2         6       981        98
VIS    2025250    183200   15.4900  148.5200       7.2         6       981        98
VIS    2025250    183200   15.4800  148.4900       7.8         5       979        98
VIS    2025250    183200   15.4800  148.2500       8.1        24       939        90
VIS    2025250    183200   15.4800  148.0700       8.7        16       909        91
VIS    2025250    183200   15.4900  148.0600       8.4        22       873        90
VIS    2025250    183200   15.4800  148.0200       7.8        24       909        90
VIS    2025250    183200   15.4800  147.9900       8.0        23       915        90
VIS    2025250    183200   15.4800  147.9600       8.2        25       892        91
VIS    2025250    183200   15.4900  147.8000       8.0        16       890        90
VIS    2025250    183200   15.4900  147.7800       8.1        14       900        92
VIS    2025250    183200   15.4900  147.7700       8.1        14       912        92
VIS    2025250    183200   15.4900  147.0300       7.0       326       943        97
VIS    2025250    183200   15.4400  142.7900       7.0       186       902        92
VIS    2025250    183200   15.4600  142.7700       6.9       187       858        95
VIS    2025250    183200   15.4500  142.7400       7.1       185       888        97
VIS    2025250    183200   15.4500  142.7400       7.1       185       888        96
VIS    2025250    183200   15.4400  142.7000       7.2       188       907        94
VIS    2025250    183200   15.4600  142.6600       7.0       192       880        92
VIS    2025250    183200   15.4400  142.3400       7.5       186       910        96
VIS    2025250    183200   15.4400  142.3200       7.2       184       941        97
VIS    2025250    183200   15.4800  149.3100       7.6        15       979        91
VIS    2025250    183200   15.4700  149.2700       7.9        10       950        93
VIS    2025250    183200   15.4600  149.2500       8.0         9       950        93
VIS    2025250    183200   15.4600  149.1700       7.0        17       976        97
VIS    2025250    183200   15.4600  149.1400       7.0        15       976        96
VIS    2025250    183200   15.4600  148.6000       7.9         2       986        97
VIS    2025250    183200   15.4800  148.5800       7.6         3       983        97
VIS    2025250    183200   15.4700  148.5500       7.0         9       987        96
VIS    2025250    183200   15.4800  148.5300       7.3         8       979        98
VIS    2025250    183200   15.4600  148.5100       7.5         8       935        98
VIS    2025250    183200   15.4700  148.4800       7.9         5       957        98
VIS    2025250    183200   15.4500  148.0400       8.8        14       916        90
VIS    2025250    183200   15.4600  147.6000       7.4         6       947        91
VIS    2025250    183200   15.4200  142.8000       7.0       185       915        96
VIS    2025250    183200   15.4200  142.7800       6.7       187       883        95
VIS    2025250    183200   15.4200  142.7600       6.8       187       866        91
VIS    2025250    183200   15.4200  142.7200       7.1       188       888        95
VIS    2025250    183200   15.4400  149.2900       8.6        12       975        93
VIS    2025250    183200   15.4400  149.2800       8.3        11       975        94
VIS    2025250    183200   15.4600  149.2500       8.0         9       950        94
VIS    2025250    183200   15.4500  149.1700       7.1        18       976        96
VIS    2025250    183200   15.4600  149.1400       7.0        17       976        95
VIS    2025250    183200   15.4400  149.1100       6.4        17       967        99
VIS    2025250    183200   15.4500  149.1000       6.1        20       967        98
VIS    2025250    183200   15.4400  148.6100       7.7         1       986        92
VIS    2025250    183200   15.4500  148.5900       7.6         5       983        97
VIS    2025250    183200   15.4300  148.5700       7.8         8       953        98
VIS    2025250    183200   15.4500  148.5400       7.5        11       957        98
VIS    2025250    183200   15.4500  148.5100       7.6         8       917        98
VIS    2025250    183200   15.4300  148.4800       7.9         3       909        94
VIS    2025250    183200   15.4500  148.4800       7.9         3       932        95
VIS    2025250    183200   15.4500  148.0300       8.5        14       912        91
VIS    2025250    183200   15.4400  148.0300       8.4        16       903        92
VIS    2025250    183200   15.4400  147.7800       6.9        22       850        90
VIS    2025250    183200   15.4200  146.6000       7.9       334      1000        93
VIS    2025250    183200   15.4100  146.5300       8.4       325       974        97
VIS    2025250    183200   15.4100  142.8300       6.6       185       855        93
VIS    2025250    183200   15.3900  142.8200       6.2       191       855        92
VIS    2025250    183200   15.4100  142.7900       6.6       188       883        97
VIS    2025250    183200   15.4100  142.7600       6.7       187       866        91
VIS    2025250    183200   15.4000  142.3900       6.9       186       915        90
VIS    2025250    183200   15.4300  149.2900       8.7        13       975        93
VIS    2025250    183200   15.4300  149.2600       8.3        14       948        92
VIS    2025250    183200   15.4200  149.2600       8.2        14       943        92
VIS    2025250    183200   15.4300  149.2100       7.4        11       967        96
VIS    2025250    183200   15.4300  149.2000       7.5        11       967        97
VIS    2025250    183200   15.4200  149.1600       7.8        14       970        95
VIS    2025250    183200   15.4200  149.1500       7.6        15       970        94
VIS    2025250    183200   15.4200  149.1200       6.9        17       967        98
VIS    2025250    183200   15.4300  149.1100       6.6        17       967        99
VIS    2025250    183200   15.4100  149.0700       6.7        10       935        98
VIS    2025250    183200   15.4100  149.0600       6.8         9       944        99
VIS    2025250    183200   15.4100  149.0400       6.9         7       964        99
VIS    2025250    183200   15.4100  148.6300       7.2        11       980        97
VIS    2025250    183200   15.4100  148.6000       7.5         8       958        98
VIS    2025250    183200   15.4200  148.5900       7.7         5       955        98
VIS    2025250    183200   15.4200  148.5600       7.8         7       934        98
VIS    2025250    183200   15.4100  148.5500       7.7         7       918        97
VIS    2025250    183200   15.4200  148.5200       7.7        10       906        97
VIS    2025250    183200   15.4200  148.1100       7.9         9       910        91
VIS    2025250    183200   15.4100  147.9300       6.8        15       934        91
VIS    2025250    183200   15.4200  147.6500       6.2         9       935        90
VIS    2025250    183200   15.4000  147.3500       6.7       344       937        95
VIS    2025250    183200   15.4100  146.5300       7.9       327       982        96
VIS    2025250    183200   15.3900  146.3700       6.3       315       975        90
VIS    2025250    183200   15.3900  146.3300       9.8       326       972        97
VIS    2025250    183200   15.4000  146.3000      11.4       323      1000        93
VIS    2025250    183200   15.3700  142.7600       7.1       187       855        92
VIS    2025250    183200   15.3700  142.3400       6.8       187       929        99
VIS    2025250    183200   15.3700  142.3400       6.9       187       922        98
VIS    2025250    183200   15.4100  149.2200       7.5         9       967        94
VIS    2025250    183200   15.4000  149.1700       8.0        10       973        95
VIS    2025250    183200   15.3900  149.1500       7.5        14       962        95
VIS    2025250    183200   15.4000  149.1300       7.1        15       962        96
VIS    2025250    183200   15.4000  149.1000       6.8        16       929        99
VIS    2025250    183200   15.4000  149.0800       6.9        13       929        98
VIS    2025250    183200   15.4000  149.0700       6.9        11       926        97
VIS    2025250    183200   15.4000  149.0400       7.0         5       939        96
VIS    2025250    183200   15.3800  148.6000       7.4        15       953        94
VIS    2025250    183200   15.3800  148.5800       7.9        12       923        97
VIS    2025250    183200   15.4000  148.5600       7.8         7       903        96
VIS    2025250    183200   15.4000  148.5300       7.8         9       903        96
VIS    2025250    183200   15.3900  148.5000       7.9         7       907        90
VIS    2025250    183200   15.4000  147.9500       6.6        13       937        94
VIS    2025250    183200   15.3900  147.9200       5.6        13       907        92
VIS    2025250    183200   15.3800  147.3900       5.8       350       979        96
VIS    2025250    183200   15.3800  147.3600       6.0       346       953        96
VIS    2025250    183200   15.3700  147.3500       5.8       347       937        93
VIS    2025250    183200   15.3700  147.2200       6.5       348       952        93
VIS    2025250    183200   15.3800  147.2100       6.6       348       964        93
VIS    2025250    183200   15.3700  146.3400       8.1       321       958        97
VIS    2025250    183200   15.3800  146.3200       9.1       327       972        99
VIS    2025250    183200   15.3600  142.8600       6.7       182       887        91
VIS    2025250    183200   15.3500  142.7600       7.9       183       880        91
VIS    2025250    183200   15.3600  142.3400       6.9       187       922        98
VIS    2025250    183200   15.3800  149.2000       7.9         7       992        97
VIS    2025250    183200   15.3800  149.1700       7.6         9       977        93
VIS    2025250    183200   15.3800  149.1100       7.4        17       923        94
VIS    2025250    183200   15.3700  149.0900       7.4        12       903        94
VIS    2025250    183200   15.3800  149.0700       7.3        11       908        95
VIS    2025250    183200   15.3800  149.0400       7.0         7       908        94
VIS    2025250    183200   15.3700  149.0300       6.9         9       944        96
VIS    2025250    183200   15.3800  149.0100       7.4         9       992        96
VIS    2025250    183200   15.3800  148.5900       7.7        15       926        96
VIS    2025250    183200   15.3800  148.5800       8.0        11       923        97
VIS    2025250    183200   15.3600  148.5400       8.0         7       903        96
VIS    2025250    183200   15.3700  148.5100       7.7         7       912        95
VIS    2025250    183200   15.3600  148.5000       7.9         5       922        97
VIS    2025250    183200   15.3600  147.9900       5.5         5       947        93
VIS    2025250    183200   15.3700  147.9800       6.1         6       947        92
VIS    2025250    183200   15.3600  146.3200       6.7       321       958        90
VIS    2025250    183200   15.3200  142.8900       7.4       184       863        95
VIS    2025250    183200   15.3300  142.8700       6.5       184       872        91
VIS    2025250    183200   15.3300  142.8500       6.6       185       888        92
VIS    2025250    183200   15.3500  149.0700       7.5         7       923        91
VIS    2025250    183200   15.3500  149.0400       7.0         9       923        94
VIS    2025250    183200   15.3600  149.0300       7.0        12       934        97
VIS    2025250    183200   15.3400  149.0100       6.9        15       968        99
VIS    2025250    183200   15.3600  148.5700       8.1        12       923        94
VIS    2025250    183200   15.3500  148.5500       8.0         7       905        96
VIS    2025250    183200   15.3400  148.5200       8.1         4       928        93
VIS    2025250    183200   15.3500  148.5000       7.9         5       922        97
VIS    2025250    183200   15.3500  148.0000       5.7         3       947        95
VIS    2025250    183200   15.3500  147.9900       4.8         8       947        92
VIS    2025250    183200   15.3000  142.9200       7.3       187       899        94
VIS    2025250    183200   15.3000  142.9000       7.2       186       875        96
VIS    2025250    183200   15.3100  142.8700       6.9       185       872        94
VIS    2025250    183200   15.3400  149.0700       7.5         6       925        92
VIS    2025250    183200   15.3400  149.0500       7.4         7       934        94
VIS    2025250    183200   15.3200  149.0300       7.6         8       946        96
VIS    2025250    183200   15.3300  148.9900       7.3        12       958        99
VIS    2025250    183200   15.2900  142.8700       6.9       185       863        92
VIS    2025250    183200   15.2700  142.3000       7.7       184       962        95
VIS    2025250    183200   15.2900  142.2800       7.8       184       962        93
VIS    2025250    183200   15.3000  149.7500       7.2        16       980        97
VIS    2025250    183200   15.3000  149.7200       6.0        22       967        93
VIS    2025250    183200   15.3000  149.7100       5.6        25       955        90
VIS    2025250    183200   15.3000  149.4400       7.7        17       959        95
VIS    2025250    183200   15.3000  149.2900       8.7        14       998        91
VIS    2025250    183200   15.3100  149.1100       7.2         7       974        97
VIS    2025250    183200   15.2900  149.0800       7.3        12       961        98
VIS    2025250    183200   15.3000  149.0800       7.3        11       961        97
VIS    2025250    183200   15.3100  149.0500       7.3         6       935        93
VIS    2025250    183200   15.3100  149.0200       7.7         7       946        94
VIS    2025250    183200   15.3100  149.0000       7.9         9       946        95
VIS    2025250    183200   15.2600  142.3000       7.6       186       968        95
VIS    2025250    183200   15.2400  142.2200       6.9       185       988        96
VIS    2025250    183200   15.2400  142.2000       6.8       184       988        97
VIS    2025250    183200   15.2600  142.1800       5.2       184       988        94
VIS    2025250    183200   15.3000  149.7600       8.0        16       980        95
VIS    2025250    183200   15.2800  149.7200       6.2        26       955        91
VIS    2025250    183200   15.2900  149.7100       5.8        27       954        91
VIS    2025250    183200   15.2800  149.2900       8.9        20       993        90
VIS    2025250    183200   15.2700  149.1500       7.9        11       998        97
VIS    2025250    183200   15.2800  149.1200       7.4        11       990        98
VIS    2025250    183200   15.2800  149.1100       7.6        11       975        99
VIS    2025250    183200   15.2900  149.0900       7.3        12       961        98
VIS    2025250    183200   15.2700  149.0600       7.2         9       958        96
VIS    2025250    183200   15.2700  149.0300       6.8         8       928        91
VIS    2025250    183200   15.2700  148.6000       7.9         4       976        97
VIS    2025250    183200   15.2400  142.9400       6.7       187       927        93
VIS    2025250    183200   15.2300  142.3400       6.3       178       961        93
VIS    2025250    183200   15.2200  142.3300       6.3       178       961        93
VIS    2025250    183200   15.2500  149.8600       7.1        23       981        93
VIS    2025250    183200   15.2500  149.7600       6.6        21       982        93
VIS    2025250    183200   15.2700  149.7400       6.4        24       966        95
VIS    2025250    183200   15.2600  149.6600       7.0        18       956        94
VIS    2025250    183200   15.2600  149.6500       7.2        18       956        95
VIS    2025250    183200   15.2600  149.1400       8.0        11       990        96
VIS    2025250    183200   15.2600  149.1100       7.9        12       974        96
VIS    2025250    183200   15.2500  149.0900       7.6        12       961        97
VIS    2025250    183200   15.2500  149.0700       7.3        10       941        94
VIS    2025250    183200   15.2600  148.5900       7.9         4       973        95
VIS    2025250    183200   15.2600  148.5800       7.9         5       973        95
VIS    2025250    183200   15.2300  147.8100       6.2       352       970        93
VIS    2025250    183200   15.2000  142.8700       6.8       189       951        92
VIS    2025250    183200   15.2200  142.3400       6.3       178       961        93
VIS    2025250    183200   15.2200  142.2100       7.5       183       902        91
VIS    2025250    183200   15.2300  149.9200       6.4        26       966        95
VIS    2025250    183200   15.2400  149.9000       6.1        25       969        92
VIS    2025250    183200   15.2500  149.8800       6.5        23       969        91
VIS    2025250    183200   15.2500  149.8700       7.1        22       981        90
VIS    2025250    183200   15.2300  149.7800       7.1        15       994        98
VIS    2025250    183200   15.2300  149.7500       7.2        20       982        96
VIS    2025250    183200   15.2400  149.7400       6.7        22       955        93
VIS    2025250    183200   15.2400  149.6400       7.6        11       950        91
VIS    2025250    183200   15.2500  149.6200       8.4         9       969        93
VIS    2025250    183200   15.2200  149.1700       7.6        10       983        97
VIS    2025250    183200   15.2200  149.1500       7.7        11       983        96
VIS    2025250    183200   15.2400  149.1100       7.9        11       990        96
VIS    2025250    183200   15.2400  149.0700       7.6         9       941        93
VIS    2025250    183200   15.2300  149.0400       7.3        11       917        93
VIS    2025250    183200   15.2200  149.0200       7.6         8       948        93
VIS    2025250    183200   15.2200  149.0100       7.7         7       948        93
VIS    2025250    183200   15.2400  148.9900       7.3         6       967        92
VIS    2025250    183200   15.2300  147.8100       6.3       353       963        93
VIS    2025250    183200   15.2100  147.6000       7.4       358       922        91
VIS    2025250    183200   15.2000  142.9200       6.3       193       931        90
VIS    2025250    183200   15.1900  142.8700       6.7       187       940        91
VIS    2025250    183200   15.1900  142.8500       6.1       193       956        92
VIS    2025250    183200   15.2200  149.9200       6.6        25       966        96
VIS    2025250    183200   15.2200  149.9100       6.5        25       966        95
VIS    2025250    183200   15.2100  149.8700       6.6        20       993        93
VIS    2025250    183200   15.2000  149.8600       6.9        18       985        94
VIS    2025250    183200   15.2200  149.8100       7.3        21       938        97
VIS    2025250    183200   15.2200  149.7900       7.2        15       994        97
VIS    2025250    183200   15.2200  149.7500       7.3        19       982        97
VIS    2025250    183200   15.2200  149.7300       7.0        17       923        95
VIS    2025250    183200   15.2100  149.1400       7.4        10       983        98
VIS    2025250    183200   15.2000  149.1100       7.8         4       994        95
VIS    2025250    183200   15.2100  149.0900       8.1         6       978        93
VIS    2025250    183200   15.2000  149.0600       7.8         8       970        95
VIS    2025250    183200   15.2000  149.0300       7.8         8       925        95
VIS    2025250    183200   15.2000  149.0300       7.9         7       947        94
VIS    2025250    183200   15.2000  148.9900       7.7         7       959        96
VIS    2025250    183200   15.1600  142.9400       6.3       196       904        91
VIS    2025250    183200   15.2000  150.8100       9.1        44       989        90
VIS    2025250    183200   15.1800  149.9600       7.9        21       978        93
VIS    2025250    183200   15.1800  149.9500       8.0        19       978        93
VIS    2025250    183200   15.1800  149.9100       7.9        22       994        95
VIS    2025250    183200   15.2000  149.8400       7.2        17       971        92
VIS    2025250    183200   15.1900  149.8300       7.2        16       971        90
VIS    2025250    183200   15.1900  149.8100       7.2        19       938        93
VIS    2025250    183200   15.1700  149.0400       8.1         2       977        91
VIS    2025250    183200   15.1900  149.0300       7.9         6       947        93
VIS    2025250    183200   15.1900  148.9900       7.6         8       954        95
VIS    2025250    183200   15.1300  142.7600       6.4       189       913        92
VIS    2025250    183200   15.1200  142.2400       6.2       190       952        98
VIS    2025250    183200   15.1800  150.9000       7.9        47       999        90
VIS    2025250    183200   15.1700  150.8700       7.9        48       972        92
VIS    2025250    183200   15.1600  149.9500       8.0        22       973        93
VIS    2025250    183200   15.1600  149.9300       7.8        23       973        96
VIS    2025250    183200   15.1700  149.9200       7.8        22       973        96
VIS    2025250    183200   15.1700  149.1300       7.8         2       992        90
VIS    2025250    183200   15.1500  148.6200       4.2        12       993        94
VIS    2025250    183200   15.1600  148.5500       8.5         5       976        90
VIS    2025250    183200   15.1400  147.9100       6.9       351       992        93
VIS    2025250    183200   15.1400  147.8900       6.8       353       987        94
VIS    2025250    183200   15.1200  142.7900       6.6       188       929        90
VIS    2025250    183200   15.1000  142.1800       6.8       191       961        91
VIS    2025250    183200   15.1500  151.0400       8.4        50       995        91
VIS    2025250    183200   15.1500  151.0200       9.1        46       995        91
VIS    2025250    183200   15.1500  149.9500       7.8        23       973        93
VIS    2025250    183200   15.1400  149.9200       6.9        23       961        93
VIS    2025250    183200   15.1400  149.9100       6.7        24       957        90
VIS    2025250    183200   15.1400  149.2100       6.8        10       991        94
VIS    2025250    183200   15.1300  149.0600       8.0         1       981        91
VIS    2025250    183200   15.1200  148.5800       6.4       359       978        99
VIS    2025250    183200   15.1200  148.5600       7.3         1       978        97
VIS    2025250    183200   15.1100  147.9800       6.0        12       972        91
VIS    2025250    183200   15.1100  147.8800       6.4       355       970        95
VIS    2025250    183200   15.0800  142.2800       5.5       184       972        92
VIS    2025250    183200   15.1300  149.9500       7.9        18       947        92
VIS    2025250    183200   15.1100  149.0900       7.7         3       986        96
VIS    2025250    183200   15.1000  149.0500       8.0         4       976        96
VIS    2025250    183200   15.1100  149.0300       8.2         5       976        95
VIS    2025250    183200   15.1000  148.5900       5.8         3       970        99
VIS    2025250    183200   15.1100  148.5700       6.3         3       970        99
VIS    2025250    183200   15.1000  148.5600       6.6         4       957        98
VIS    2025250    183200   15.0900  148.0200       6.4       344       989        98
VIS    2025250    183200   15.0900  147.9800       5.5         4       972        93
VIS    2025250    183200   15.0700  142.3900       6.6       189       989        91
VIS    2025250    183200   15.0600  142.3800       6.6       189       989        91
VIS    2025250    183200   15.0500  142.3200       7.2       184       972        90
VIS    2025250    183200   15.0500  142.3000       7.3       182       972        90
VIS    2025250    183200   15.0600  142.2200       5.0       181       909        96
VIS    2025250    183200   15.0900  150.1700       6.6        28       986        98
VIS    2025250    183200   15.0900  150.1600       6.8        28       986        97
VIS    2025250    183200   15.1000  149.0900       7.4         4       986        97
VIS    2025250    183200   15.0900  149.0400       7.9         6       923        94
VIS    2025250    183200   15.0700  148.7300       5.7        15       933        93
VIS    2025250    183200   15.0700  148.6000       6.3         4       907        97
VIS    2025250    183200   15.0800  148.5900       6.4         4       907        98
VIS    2025250    183200   15.0700  148.5500       6.5         7       904        94
VIS    2025250    183200   15.0800  148.5400       6.5         4       921        95
VIS    2025250    183200   15.0800  148.0200       6.6       341       989        97
VIS    2025250    183200   15.0500  142.3900       6.6       189       989        90
VIS    2025250    183200   15.0300  142.2400       5.3       180       947        95
VIS    2025250    183200   15.0700  150.3600       8.5        38       980        90
VIS    2025250    183200   15.0800  150.1700       6.6        28       973        93
VIS    2025250    183200   15.0600  150.1500       7.0        26       962        98
VIS    2025250    183200   15.0800  150.1300       6.9        27       986        94
VIS    2025250    183200   15.0700  150.1000       7.8        30       988        94
VIS    2025250    183200   15.0700  150.0800       8.9        30       974        91
VIS    2025250    183200   15.0700  148.8500       8.2         6       986        91
VIS    2025250    183200   15.0500  148.8100       7.3         1       974        96
VIS    2025250    183200   15.0500  148.6500       5.4         6       923        92
VIS    2025250    183200   15.0600  148.6000       6.3         4       904        96
VIS    2025250    183200   15.0700  148.5900       6.6         5       904        97
VIS    2025250    183200   15.0700  148.5600       6.6         6       903        94
VIS    2025250    183200   15.0100  142.2200       5.3       182       918        92
VIS    2025250    183200   15.0200  142.1500       6.4       181       874        92
VIS    2025250    183200   15.0400  150.2400       7.5        31       935        91
VIS    2025250    183200   15.0400  150.1400       7.4        26       941        93
VIS    2025250    183200   15.0500  150.1100       7.9        25       961        95
VIS    2025250    183200   15.0400  150.1100       8.1        24       918        92
VIS    2025250    183200   15.0400  150.0800       8.3        27       932        93
VIS    2025250    183200   15.0500  150.0600       8.8        30       974        91
VIS    2025250    183200   15.0500  148.8800       8.1         4       986        91
VIS    2025250    183200   15.0300  148.8500       8.1         3       974        94
VIS    2025250    183200   15.0300  148.8300       8.1       358       974        93
VIS    2025250    183200   15.0400  148.7900       6.8         4       959        96
VIS    2025250    183200   15.0400  148.7800       6.5         6       941        96
VIS    2025250    183200   15.0300  148.7000       7.2         8       941        91
VIS    2025250    183200   15.0400  148.6700       7.1         3       938        91
VIS    2025250    183200   15.0200  148.6400       6.8         2       916        92
VIS    2025250    183200   15.0200  148.6400       6.8         1       916        93
VIS    2025250    183200   15.0400  148.5900       7.3         2       896        92
VIS    2025250    183200   15.0300  148.5800       7.5         1       896        90
VIS    2025250    183200   15.0200  148.5200       6.4       352       925        90
VIS    2025250    183200   15.0200  147.9900       7.0       349       981        93
VIS    2025250    183200   15.0300  151.1600       8.1        57      1000        90
VIS    2025250    183200   15.0200  150.2400       7.8        32       921        93
VIS    2025250    183200   15.0300  150.2400       7.7        30       927        93
VIS    2025250    183200   15.0400  150.2100       7.4        30       921        92
VIS    2025250    183200   15.0200  150.0800       8.3        25       932        90
VIS    2025250    183200   15.0200  150.0600       8.3        30       932        90
VIS    2025250    183200   15.0000  148.8600       7.9         6       981        93
VIS    2025250    183200   15.0200  148.8500       8.1         4       981        94
VIS    2025250    183200   15.0200  148.8100       7.9       359       948        93
VIS    2025250    183200   15.0100  148.8000       7.6         0       941        94
VIS    2025250    183200   15.0100  148.7600       7.1         8       902        96
VIS    2025250    183200   15.0200  148.7400       7.3        11       908        95
VIS    2025250    183200   15.0000  148.7300       7.7         4       908        95
VIS    2025250    183200   15.0000  148.7100       7.6         4       918        95
VIS    2025250    183200   15.0000  148.6800       7.4         2       923        95
VIS    2025250    183200   15.0000  148.6500       7.2         3       934        92
VIS    2025250    183200   15.0200  148.6400       7.1         1       923        93
VIS    2025250    183200   15.0000  148.6100       7.2         0       900        94
VIS    2025250    183200   15.0000  148.5800       7.0       359       897        94
VIS    2025250    183200   15.0000  148.5500       6.6       353       896        90
VIS    2025250    183200   15.0100  148.4900       6.1       353       938        90
VIS    2025250    183200   15.0200  148.4900       6.2       354       938        91
VIS    2025250    183200   15.0000  148.4300       7.1       353       961        96
VIS    2025250    183200   15.0000  148.4200       7.2       350       968        95
VIS    2025250    183200   15.0000  148.8800       7.8         6       990        91
VIS    2025250    183200   14.9900  148.8600       7.7         7       974        92
VIS    2025250    183200   14.9800  148.8300       7.8         7       921        92
VIS    2025250    183200   14.9900  148.8100       7.9         4       914        92
VIS    2025250    183200   14.9800  148.8000       7.8         5       914        93
VIS    2025250    183200   14.9800  148.7700       7.0         9       912        93
VIS    2025250    183200   15.0000  148.7400       7.1         7       907        94
VIS    2025250    183200   15.0000  148.7200       7.5         4       913        96
VIS    2025250    183200   15.0000  148.7100       7.5         4       915        95
VIS    2025250    183200   14.9900  148.6800       7.1         2       915        94
VIS    2025250    183200   14.9900  148.6500       6.6         6       934        90
VIS    2025250    183200   14.9800  148.6100       7.2         5       935        95
VIS    2025250    183200   15.0000  148.6000       7.0         1       898        94
VIS    2025250    183200   14.9800  148.5700       6.8       359       896        93
VIS    2025250    183200   14.9800  148.5500       6.4       359       896        93
VIS    2025250    183200   14.9900  148.4700       6.3       354       945        92
VIS    2025250    183200   14.9800  148.4400       6.8       357       953        95
VIS    2025250    183200   14.9800  148.4400       6.9       358       950        95
VIS    2025250    183200   14.9500  142.1500       5.9       187       965        90
VIS    2025250    183200   14.9600  148.8400       7.5         6       929        92
VIS    2025250    183200   14.9500  148.8200       7.6         4       921        90
VIS    2025250    183200   14.9700  148.8000       7.7         6       914        93
VIS    2025250    183200   14.9700  148.7700       7.1        10       914        92
VIS    2025250    183200   14.9700  148.7400       7.1         7       902        91
VIS    2025250    183200   14.9500  148.7100       6.7         9       899        93
VIS    2025250    183200   14.9600  148.7000       6.5         7       907        91
VIS    2025250    183200   14.9700  148.6200       7.1         8       920        96
VIS    2025250    183200   14.9500  148.6100       7.7         6       898        95
VIS    2025250    183200   14.9700  148.5800       7.2         3       898        93
VIS    2025250    183200   14.9700  148.5500       6.5       359       896        92
VIS    2025250    183200   14.9500  148.4600       6.6       359       927        93
VIS    2025250    183200   14.9700  148.4400       6.8       359       932        94
VIS    2025250    183200   14.9400  149.6200       8.3         7       991        90
VIS    2025250    183200   14.9400  149.5700       7.9        19       991        98
VIS    2025250    183200   14.9400  148.8000       7.7         7       921        91
VIS    2025250    183200   14.9400  148.7600       7.7        10       892        92
VIS    2025250    183200   14.9500  148.7500       7.5         9       890        92
VIS    2025250    183200   14.9500  148.6800       6.1         9       932        91
VIS    2025250    183200   14.9300  148.6300       7.4         7       905        94
VIS    2025250    183200   14.9400  148.6000       8.0         5       896        94
VIS    2025250    183200   14.9300  148.5600       7.1        10       901        92
VIS    2025250    183200   14.9500  148.4700       6.6       358       927        91
VIS    2025250    183200   14.9500  148.4500       6.7       359       927        90
VIS    2025250    183200   14.9300  151.5300       7.5        54       971        94
VIS    2025250    183200   14.9200  149.6100       8.3         7       991        90
VIS    2025250    183200   14.9100  149.5100       8.5         8       985        90
VIS    2025250    183200   14.9100  148.8000       8.2         9       935        93
VIS    2025250    183200   14.9100  148.7700       8.1        10       895        93
VIS    2025250    183200   14.9200  148.7600       7.9        10       891        92
VIS    2025250    183200   14.9100  148.7400       7.7        10       892        93
VIS    2025250    183200   14.9200  148.7000       7.2         7       901        90
VIS    2025250    183200   14.9100  148.6800       7.4         5       944        92
VIS    2025250    183200   14.9000  148.6600       7.8         4       946        93
VIS    2025250    183200   14.9100  148.6300       7.4         4       912        94
VIS    2025250    183200   14.9200  148.6100       7.5         3       900        94
VIS    2025250    183200   14.9200  148.5900       7.1         6       900        94
VIS    2025250    183200   14.9100  148.5700       6.7         9       904        90
VIS    2025250    183200   14.9100  148.5100       7.1         0       948        93
VIS    2025250    183200   14.9200  148.5000       6.9       359       948        95
VIS    2025250    183200   14.9200  148.4800       6.8       355       941        90
VIS    2025250    183200   14.8700  142.1700       6.3       197       907        96
VIS    2025250    183200   14.9200  151.5400       7.2        53       969        90
VIS    2025250    183200   14.8900  149.5800       7.9        11       971        90
VIS    2025250    183200   14.8900  149.5800       7.8        12       978        92
VIS    2025250    183200   14.8900  149.5000       8.4         5       985        94
VIS    2025250    183200   14.8900  149.4800       8.2         7       990        93
VIS    2025250    183200   14.9000  148.8800       8.3        15       992        96
VIS    2025250    183200   14.8900  148.8700       8.6        25       970        93
VIS    2025250    183200   14.8800  148.8500       8.5        17       984        95
VIS    2025250    183200   14.8900  148.8100       8.5        10       953        95
VIS    2025250    183200   14.9000  148.7900       8.6         9       917        93
VIS    2025250    183200   14.8900  148.7700       8.6        11       895        92
VIS    2025250    183200   14.9000  148.7500       8.1        10       892        93
VIS    2025250    183200   14.9000  148.7100       7.7         7       901        95
VIS    2025250    183200   14.9000  148.7100       7.7         6       914        95
VIS    2025250    183200   14.9000  148.6600       8.1         3       940        93
VIS    2025250    183200   14.9000  148.6600       8.0         4       940        93
VIS    2025250    183200   14.8900  148.6300       7.9         1       923        92
VIS    2025250    183200   14.8900  148.6100       7.6       359       907        93
VIS    2025250    183200   14.8800  148.5200       7.3       359       948        96
VIS    2025250    183200   14.8800  148.4900       6.6       356       931        96
VIS    2025250    183200   14.8800  149.5500       8.4        11       969        92
VIS    2025250    183200   14.8700  149.5100       9.3         7       982        92
VIS    2025250    183200   14.8800  149.4900       8.3         7       990        90
VIS    2025250    183200   14.8700  149.4600       8.2        10       991        94
VIS    2025250    183200   14.8700  148.8400       8.6        22       981        94
VIS    2025250    183200   14.8800  148.8200       8.5        13       969        95
VIS    2025250    183200   14.8600  148.7700       9.1        13       917        90
VIS    2025250    183200   14.8600  148.7400       8.8        12       901        90
VIS    2025250    183200   14.8700  148.7200       8.2         8       901        94
VIS    2025250    183200   14.8600  148.7100       8.3         7       901        93
VIS    2025250    183200   14.8600  148.6700       8.2         1       914        92
VIS    2025250    183200   14.8700  148.6500       8.1         3       923        90
VIS    2025250    183200   14.8700  148.6000       7.3       358       927        96
VIS    2025250    183200   14.8700  148.5700       6.2       360       942        96
VIS    2025250    183200   14.8600  148.5200       7.1       359       955        96
VIS    2025250    183200   14.8600  148.5100       6.8       359       948        95
VIS    2025250    183200   14.8600  148.4900       6.4       356       924        95
VIS    2025250    183200   14.8600  148.4600       6.5       359       931        93
VIS    2025250    183200   14.8500  148.4400       6.7         2       968        90
VIS    2025250    183200   14.8600  148.4200       6.4         4       981        93
VIS    2025250    183200   14.8400  149.6400       7.7         7       997        93
VIS    2025250    183200   14.8600  149.5200       9.3         8       982        92
VIS    2025250    183200   14.8500  149.4500       8.2        10       992        93
VIS    2025250    183200   14.8500  149.4300       8.5        11       984        96
VIS    2025250    183200   14.8500  148.7200       8.4         8       901        92
VIS    2025250    183200   14.8500  148.7000       8.3         4       904        93
VIS    2025250    183200   14.8500  148.6700       8.2         1       907        92
VIS    2025250    183200   14.8500  148.6400       7.8         5       909        91
VIS    2025250    183200   14.8500  148.6300       7.5         7       909        94
VIS    2025250    183200   14.8500  148.5200       6.8         1       948        92
VIS    2025250    183200   14.8400  148.5100       6.7         1       955        90
VIS    2025250    183200   14.8300  148.4800       6.4         1       933        91
VIS    2025250    183200   14.8400  148.4600       6.5       359       933        94
VIS    2025250    183200   14.8300  148.4300       7.0         4       968        91
VIS    2025250    183200   14.8400  151.5200       6.9        50       982        90
VIS    2025250    183200   14.8200  149.6200       8.2         9       991        96
VIS    2025250    183200   14.8200  149.6100       8.3         9       985        96
VIS    2025250    183200   14.8200  149.5900       8.8         4       976        93
VIS    2025250    183200   14.8400  149.4500       8.2        10       992        94
VIS    2025250    183200   14.8400  149.4300       8.4        11       975        96
VIS    2025250    183200   14.8200  149.4000       8.0        10       973        95
VIS    2025250    183200   14.8200  149.3900       7.7        12       973        95
VIS    2025250    183200   14.8200  148.8200       9.0        22       989        90
VIS    2025250    183200   14.8200  148.6800       8.3         6       902        91
VIS    2025250    183200   14.8200  148.6500       7.8         6       902        93
VIS    2025250    183200   14.8100  148.6400       7.7        10       907        94
VIS    2025250    183200   14.8100  148.6000       7.0        13       946        93
VIS    2025250    183200   14.8200  148.5700       7.0         3       949        92
VIS    2025250    183200   14.8200  148.5700       7.1         4       949        91
VIS    2025250    183200   14.8200  148.4900       7.0         1       933        92
VIS    2025250    183200   14.8300  148.4700       6.7         1       931        92
VIS    2025250    183200   14.8200  151.4800       6.0        51       982        93
VIS    2025250    183200   14.8000  149.6300       8.0        11       976        94
VIS    2025250    183200   14.8000  149.6100       8.3         9       976        95
VIS    2025250    183200   14.8000  149.5900       8.5         6       964        93
VIS    2025250    183200   14.8000  149.4600       7.9         6       981        90
VIS    2025250    183200   14.8100  149.4400       8.3         7       981        92
VIS    2025250    183200   14.8100  149.4300       8.3         7       975        93
VIS    2025250    183200   14.8100  149.3900       7.8        11       973        96
VIS    2025250    183200   14.8100  149.3800       7.8        12       975        96
VIS    2025250    183200   14.7900  148.6900       8.4         8       933        90
VIS    2025250    183200   14.7900  148.6600       8.3         8       905        90
VIS    2025250    183200   14.8000  148.6400       8.0         9       907        91
VIS    2025250    183200   14.8000  148.6300       7.7        10       914        94
VIS    2025250    183200   14.7900  148.6100       7.2        12       932        91
VIS    2025250    183200   14.8000  148.5000       7.5         2       964        94
VIS    2025250    183200   14.7900  148.4900       7.5         2       961        95
VIS    2025250    183200   14.7700  146.8000       4.0       353       975        91
VIS    2025250    183200   14.7900  151.5300       7.0        46       966        95
VIS    2025250    183200   14.7900  149.6300       7.9        11       976        91
VIS    2025250    183200   14.7700  149.5900       8.2         7       964        90
VIS    2025250    183200   14.7900  149.4600       7.9         6       981        91
VIS    2025250    183200   14.7900  149.4500       7.9         7       981        91
VIS    2025250    183200   14.7700  149.4200       8.1         6       990        94
VIS    2025250    183200   14.7900  149.4000       8.1         7       990        94
VIS    2025250    183200   14.7700  149.3600       7.9        16       976        98
VIS    2025250    183200   14.7800  149.3500       7.9        18       976        98
VIS    2025250    183200   14.7700  149.3100       8.1        22       976        94
VIS    2025250    183200   14.7800  148.7000       8.2         7       959        93
VIS    2025250    183200   14.7600  148.6800       8.1         5       959        92
VIS    2025250    183200   14.7800  148.6500       8.3         6       929        91
VIS    2025250    183200   14.7800  148.6400       8.2         7       914        91
VIS    2025250    183200   14.7800  148.6000       7.3        15       923        90
VIS    2025250    183200   14.7800  148.5900       7.2        15       923        91
VIS    2025250    183200   14.7700  148.5700       7.0        10       938        92
VIS    2025250    183200   14.7800  148.5400       7.2         2       969        93
VIS    2025250    183200   14.7700  148.5000       7.5       359       961        96
VIS    2025250    183200   14.7700  148.5000       7.3         1       961        97
VIS    2025250    183200   14.7600  148.4600       7.0         0       958        92
VIS    2025250    183200   14.7800  151.5300       6.6        47       966        98
VIS    2025250    183200   14.7800  151.5200       7.6        46       952        96
VIS    2025250    183200   14.7600  149.5900       7.9         8       964        90
VIS    2025250    183200   14.7600  149.5700       8.1         8       971        92
VIS    2025250    183200   14.7600  149.5300       8.4        10       975        90
VIS    2025250    183200   14.7600  149.5200       8.2         7       975        92
VIS    2025250    183200   14.7500  149.4500       7.7        11       965        94
VIS    2025250    183200   14.7500  149.4100       8.1         8       990        95
VIS    2025250    183200   14.7500  149.4000       7.9         8       993        95
VIS    2025250    183200   14.7500  149.3700       7.7        13       990        97
VIS    2025250    183200   14.7600  149.3500       8.0        18       970        98
VIS    2025250    183200   14.7500  148.6800       7.9         3       966        93
VIS    2025250    183200   14.7400  148.6400       7.9         6       937        93
VIS    2025250    183200   14.7400  148.6400       7.8         8       965        92
VIS    2025250    183200   14.7500  148.5900       7.7        10       966        92
VIS    2025250    183200   14.7400  148.5700       7.7         6       965        92
VIS    2025250    183200   14.7400  148.5500       7.6         5       965        92
VIS    2025250    183200   14.7400  148.5300       7.4         1       922        94
VIS    2025250    183200   14.7400  148.5000       6.9         0       922        92
VIS    2025250    183200   14.7500  148.4900       6.9         1       953        94
VIS    2025250    183200   14.7500  148.4600       6.9         0       958        94
VIS    2025250    183200   14.7200  147.2500       4.9       347       943        93
VIS    2025250    183200   14.7000  143.3500       5.0       201       903        94
VIS    2025250    183200   14.7400  151.5500       5.5        54       958        96
VIS    2025250    183200   14.7400  151.5400       5.7        54       958        94
VIS    2025250    183200   14.7600  151.5000       7.5        47       950        91
VIS    2025250    183200   14.7300  149.3800       8.0        11       970        92
VIS    2025250    183200   14.7300  149.3700       8.1        12       970        92
VIS    2025250    183200   14.7300  149.3300       8.5        20       954        93
VIS    2025250    183200   14.7200  149.3200       8.2        22       934        93
VIS    2025250    183200   14.7100  148.7100       7.5         3       990        95
VIS    2025250    183200   14.7200  148.6700       7.5         0       978        94
VIS    2025250    183200   14.7100  148.6600       7.6         5       969        93
VIS    2025250    183200   14.7300  148.6300       7.8        10       965        90
VIS    2025250    183200   14.7300  148.6100       7.9        10       968        91
VIS    2025250    183200   14.7100  148.5800       8.4         7       956        90
VIS    2025250    183200   14.7300  148.5600       7.8         6       933        91
VIS    2025250    183200   14.7100  148.5300       7.7         2       903        91
VIS    2025250    183200   14.7200  148.5200       7.3         1       909        90
VIS    2025250    183200   14.7300  148.5000       6.9       360       921        90
VIS    2025250    183200   14.7300  148.4500       7.4       359       933        94
VIS    2025250    183200   14.7200  147.2600       4.8       350       943        91
VIS    2025250    183200   14.6700  142.4100       8.2        80       188        90
VIS    2025250    183200   14.7400  151.5500       6.0        54       958        96
VIS    2025250    183200   14.7400  151.5400       6.1        55       958        96
VIS    2025250    183200   14.7000  149.3300       8.3        16       954        93
VIS    2025250    183200   14.7000  149.3000       7.4        14       965        96
VIS    2025250    183200   14.7000  149.2900       7.4        13       965        97
VIS    2025250    183200   14.6900  149.2600       7.4        14       965        97
VIS    2025250    183200   14.7100  148.6700       7.6         3       978        91
VIS    2025250    183200   14.7100  148.6400       7.8        12       972        91
VIS    2025250    183200   14.7100  148.5800       8.4         7       933        90
VIS    2025250    183200   14.7000  148.5600       8.1         7       912        91
VIS    2025250    183200   14.7100  148.5200       7.6         2       909        90
VIS    2025250    183200   14.6600  142.4000       8.0        80       198        90
VIS    2025250    183200   14.7000  151.5400       7.6        55       962        90
VIS    2025250    183200   14.7100  151.5300       7.1        53       958        91
VIS    2025250    183200   14.7000  151.4700       5.0        65       938        90
VIS    2025250    183200   14.6800  149.8000       7.0        24       955        92
VIS    2025250    183200   14.6700  149.3200       7.7        15       968        91
VIS    2025250    183200   14.6900  149.2900       7.5        14       965        96
VIS    2025250    183200   14.6900  149.2900       7.4        13       965        96
VIS    2025250    183200   14.6700  148.6800       8.1         4       986        92
VIS    2025250    183200   14.6700  148.6700       8.1         4       986        93
VIS    2025250    183200   14.6700  148.6400       8.0         2       983        92
VIS    2025250    183200   14.6700  148.6300       8.2         5       974        91
VIS    2025250    183200   14.6800  148.5600       8.0         8       912        92
VIS    2025250    183200   14.6600  148.5500       7.6        10       915        92
VIS    2025250    183200   14.6800  148.5300       7.7         5       912        90
VIS    2025250    183200   14.6800  151.5900       6.6        57       935        91
VIS    2025250    183200   14.6900  151.5300       7.5        58       941        91
VIS    2025250    183200   14.6800  151.5000       6.4        67       929        92
VIS    2025250    183200   14.6800  151.4800       5.3        67       923        91
VIS    2025250    183200   14.6900  151.4200       5.1        63       948        94
VIS    2025250    183200   14.6700  151.3900       6.2        61       980        96
VIS    2025250    183200   14.6700  149.8000       7.1        23       955        92
VIS    2025250    183200   14.6600  149.7900       7.3        19       955        93
VIS    2025250    183200   14.6600  148.6400       8.0         1       983        91
VIS    2025250    183200   14.6600  148.6400       7.9         1       983        90
VIS    2025250    183200   14.6600  148.5800       7.8        10       920        93
VIS    2025250    183200   14.6600  148.5600       7.5        11       915        93
VIS    2025250    183200   14.6400  148.5400       7.2         9       916        93
VIS    2025250    183200   14.6400  148.5000       7.5         6       929        90
VIS    2025250    183200   14.6600  148.4000       7.3         1       983        90
VIS    2025250    183200   14.6300  147.1600       4.7       345       921        91
VIS    2025250    183200   14.6700  151.5200       7.1        64       929        91
VIS    2025250    183200   14.6500  151.4700       7.1        56       927        94
VIS    2025250    183200   14.6500  151.4600       6.8        56       916        94
VIS    2025250    183200   14.6500  151.4300       6.4        58       938        96
VIS    2025250    183200   14.6500  151.4000       6.1        58       957        97
VIS    2025250    183200   14.6400  151.3700       6.9        58       960        92
VIS    2025250    183200   14.6200  148.9900       8.7        13      1000        94
VIS    2025250    183200   14.6300  148.5500       7.3        11       922        90
VIS    2025250    183200   14.6200  148.5500       7.4        11       940        90
VIS    2025250    183200   14.6200  148.5200       7.3         8       916        90
VIS    2025250    183200   14.6400  148.5000       7.5         7       929        90
VIS    2025250    183200   14.6300  151.4500       7.4        53       936        92
VIS    2025250    183200   14.6300  151.4200       6.8        54       937        93
VIS    2025250    183200   14.6300  151.4100       6.7        52       937        92
VIS    2025250    183200   14.6100  150.2900       8.3        32       958        94
VIS    2025250    183200   14.6200  149.0000       8.5         8      1000        94
VIS    2025250    183200   14.6000  148.9800       8.1        13       990        92
VIS    2025250    183200   14.6000  148.5300       7.8         8       944        90
VIS    2025250    183200   14.6100  148.5000       7.5         9       929        90
VIS    2025250    183200   14.6000  148.3700       7.2         3       990        90
VIS    2025250    183200   14.5900  149.0000       8.5         5       994        93
VIS    2025250    183200   14.5700  148.5500       8.5        10       942        90
VIS    2025250    183200   14.5800  148.5300       8.0        10       944        93
VIS    2025250    183200   14.5900  148.4500       7.5        16       967        90
VIS    2025250    183200   14.5700  148.3900       7.3         8       940        93
VIS    2025250    183200   14.5700  148.3700       7.1         6       931        91
VIS    2025250    183200   14.5400  145.5200       4.6       265       932        91
VIS    2025250    183200   14.5400  145.5200       4.4       266       932        94
VIS    2025250    183200   14.5400  145.4900       4.2       268       932        95
VIS    2025250    183200   14.5600  150.1400       8.0        24       977        93
VIS    2025250    183200   14.5500  148.6000       8.3         9       972        90
VIS    2025250    183200   14.5500  148.5800       8.3         8       952        91
VIS    2025250    183200   14.5600  148.5700       8.3         8       944        91
VIS    2025250    183200   14.5500  148.5400       8.1        11       939        93
VIS    2025250    183200   14.5400  148.5100       7.3        19       926        94
VIS    2025250    183200   14.5600  148.4900       6.9        17       930        92
VIS    2025250    183200   14.5400  148.4600       7.5        12       979        94
VIS    2025250    183200   14.5500  148.4300       7.7        14       979        93
VIS    2025250    183200   14.5600  148.4100       7.6         8       949        95
VIS    2025250    183200   14.5500  148.3800       7.6         5       927        93
VIS    2025250    183200   14.5500  148.3800       7.5         5       927        93
VIS    2025250    183200   14.5500  146.4200       4.1       329       875        93
VIS    2025250    183200   14.5300  145.5200       4.2       265       932        90
VIS    2025250    183200   14.5600  150.1600       7.9        25       977        91
VIS    2025250    183200   14.5400  150.1300       8.1        27       983        95
VIS    2025250    183200   14.5300  148.5800       8.1         7       962        91
VIS    2025250    183200   14.5300  148.5500       7.9        10       940        90
VIS    2025250    183200   14.5300  148.5200       7.7        20       928        92
VIS    2025250    183200   14.5400  148.5100       7.4        19       927        93
VIS    2025250    183200   14.5200  148.4700       7.7         7       965        94
VIS    2025250    183200   14.5300  148.4500       7.8         8       948        94
VIS    2025250    183200   14.5200  148.4200       7.7         5       938        95
VIS    2025250    183200   14.5300  148.4100       7.5         6       938        95
VIS    2025250    183200   14.5300  148.3800       7.4         6       915        92
VIS    2025250    183200   14.4900  142.5800       8.8        56       199        90
VIS    2025250    183200   14.5300  150.1300       8.0        28       983        95
VIS    2025250    183200   14.5200  150.1100       8.0        28       983        93
VIS    2025250    183200   14.5100  150.0900       8.2        25       973        90
VIS    2025250    183200   14.5000  149.0500       7.3        15       968        99
VIS    2025250    183200   14.5100  149.0300       7.5        11       985        98
VIS    2025250    183200   14.5100  148.5900       8.0        12       977        90
VIS    2025250    183200   14.5100  148.5500       8.1        19       946        90
VIS    2025250    183200   14.5100  148.4900       7.7        11       946        93
VIS    2025250    183200   14.5100  148.4900       7.7         9       946        93
VIS    2025250    183200   14.5000  148.4400       8.0         6       936        93
VIS    2025250    183200   14.5000  148.4300       7.9         6       926        94
VIS    2025250    183200   14.5000  148.4100       7.6         7       926        94
VIS    2025250    183200   14.5000  151.4400       6.5        48       979        94
VIS    2025250    183200   14.4800  149.0600       7.1         7       974        95
VIS    2025250    183200   14.4900  149.0300       7.6        11       968        97
VIS    2025250    183200   14.4800  148.4400       7.8         7       926        91
VIS    2025250    183200   14.4700  149.0700       7.0         6       980        95
VIS    2025250    183200   14.4700  149.0400       7.4         7       968        93
VIS    2025250    183200   14.3600  149.5100       7.8         5       982        94
VIS    2025250    183200   14.3600  149.6100       8.8         9       971        90
VIS    2025250    183200   14.3500  149.5700       7.6        10       979        97
VIS    2025250    183200   14.3500  149.5600       7.5        10       979        97
VIS    2025250    183200   14.3400  149.5300       7.8        11       977        96
VIS    2025250    183200   14.3400  149.5000       7.9         7       975        95
VIS    2025250    183200   14.3400  149.4900       7.7         9       966        94
VIS    2025250    183200   14.3400  149.4400       6.2        12       968        92
VIS    2025250    183200   14.3500  149.4400       6.2        13       940        91
OIR    2025250    183200   18.5800  144.6400      14.0       147       140        60
OIR    2025250    183200   18.5600  144.6600      14.1       147       136        60
OIR    2025250    183200   18.5400  144.6400      14.0       148       140        60
OIR    2025250    183200   18.5400  144.6200      14.0       149       140        60
OIR    2025250    183200   18.5200  144.6400      14.1       150       140        60
OIR    2025250    183200   18.5000  144.6400      14.2       152       140        60
OIR    2025250    183200   18.5000  144.5800      14.7       158       140        60
OIR    2025250    183200   18.5000  144.5600      14.9       160       140        60
OIR    2025250    183200   18.4800  144.7000      14.3       151       136        60
OIR    2025250    183200   18.4800  144.6800      14.4       152       140        60
OIR    2025250    183200   18.4800  144.5800      15.1       161       140        60
OIR    2025250    183200   18.4600  144.7200      14.2       151       144        60
OIR    2025250    183200   18.4600  144.7000      14.3       152       144        60
OIR    2025250    183200   18.4600  144.6200      14.9       160       140        60
OIR    2025250    183200   18.4600  144.6000      15.0       162       140        60
OIR    2025250    183200   18.1800  145.0600       8.6        98       136        60
OIR    2025250    183200   18.1800  145.0200       8.7       101       140        60
OIR    2025250    183200   18.1800  144.9800       9.4       112       140        60
OIR    2025250    183200   18.1400  145.2000       9.8        87       140        60
OIR    2025250    183200   18.1200  145.1600       9.3        88       140        60
OIR    2025250    183200   18.1000  145.2000       9.6        85       140        60
OIR    2025250    183200   18.6400  144.8800      14.0       134       136        60
OIR    2025250    183200   18.6400  144.8600      14.0       134       136        60
OIR    2025250    183200   18.6400  144.8200      14.0       135       140        60
OIR    2025250    183200   18.6200  144.9400      13.8       133       136        60
OIR    2025250    183200   18.6200  144.9200      13.9       134       136        60
OIR    2025250    183200   18.6200  144.9000      13.9       134       136        60
OIR    2025250    183200   18.6200  144.8800      13.9       134       136        60
OIR    2025250    183200   18.6200  144.8600      14.0       134       136        60
OIR    2025250    183200   18.6200  144.8400      14.0       135       140        60
OIR    2025250    183200   18.6200  144.8200      14.0       135       136        60
OIR    2025250    183200   18.6000  145.0000      12.7       129       132        60
OIR    2025250    183200   18.6000  144.9800      13.1       131       136        60
OIR    2025250    183200   18.6000  144.9600      13.3       132       136        60
OIR    2025250    183200   18.6000  144.9400      13.6       133       128        60
OIR    2025250    183200   18.6000  144.9200      13.7       134       132        60
OIR    2025250    183200   18.6000  144.9000      13.8       134       132        60
OIR    2025250    183200   18.6000  144.8800      13.9       134       132        60
OIR    2025250    183200   18.6000  144.8600      13.9       135       136        60
OIR    2025250    183200   18.6000  144.8400      13.9       135       136        60
OIR    2025250    183200   18.6000  144.8200      13.9       135       140        60
OIR    2025250    183200   18.6000  144.7800      14.0       136       136        60
OIR    2025250    183200   18.6000  144.7600      14.0       137       140        60
OIR    2025250    183200   18.5800  145.0600      11.3       121       132        60
OIR    2025250    183200   18.5800  145.0400      11.4       122       136        60
OIR    2025250    183200   18.5800  145.0200      11.7       125       136        60
OIR    2025250    183200   18.5800  145.0000      12.2       128       132        60
OIR    2025250    183200   18.5800  144.9800      12.7       130       132        60
OIR    2025250    183200   18.5800  144.9600      13.0       131       136        60
OIR    2025250    183200   18.5800  144.9400      13.3       133       136        60
OIR    2025250    183200   18.5800  144.9200      13.5       134       132        60
OIR    2025250    183200   18.5800  144.9000      13.6       134       136        60
OIR    2025250    183200   18.5800  144.8800      13.7       134       132        60
OIR    2025250    183200   18.5800  144.8600      13.7       135       132        60
OIR    2025250    183200   18.5800  144.8400      13.8       135       136        60
OIR    2025250    183200   18.5800  144.8200      13.8       136       136        60
OIR    2025250    183200   18.5800  144.8000      13.9       136       136        60
OIR    2025250    183200   18.5800  144.7800      13.9       137       132        60
OIR    2025250    183200   18.5800  144.7600      14.0       138       136        60
OIR    2025250    183200   18.5800  144.7400      14.1       142       140        60
OIR    2025250    183200   18.5600  145.1000      11.1       119       132        60
OIR    2025250    183200   18.5600  145.0800      11.1       120       136        60
OIR    2025250    183200   18.5600  145.0600      11.2       121       132        60
OIR    2025250    183200   18.5600  145.0400      11.2       122       132        60
OIR    2025250    183200   18.5600  145.0200      11.4       124       128        60
OIR    2025250    183200   18.5600  145.0000      11.9       127       132        60
OIR    2025250    183200   18.5600  144.9800      12.4       129       132        60
OIR    2025250    183200   18.5600  144.9600      12.8       131       128        60
OIR    2025250    183200   18.5600  144.9400      13.1       132       132        60
OIR    2025250    183200   18.5600  144.9200      13.2       133       132        60
OIR    2025250    183200   18.5600  144.9000      13.4       134       136        60
OIR    2025250    183200   18.5600  144.8800      13.5       135       132        60
OIR    2025250    183200   18.5600  144.8600      13.5       135       136        60
OIR    2025250    183200   18.5600  144.8400      13.6       136       132        60
OIR    2025250    183200   18.5600  144.8200      13.7       136       136        60
OIR    2025250    183200   18.5600  144.8000      13.8       137       132        60
OIR    2025250    183200   18.5600  144.7800      13.9       138       136        60
OIR    2025250    183200   18.5600  144.7600      13.9       140       128        60
OIR    2025250    183200   18.5600  144.7400      14.2       143       140        60
OIR    2025250    183200   18.5600  144.6800      14.1       147       132        60
OIR    2025250    183200   18.5400  145.1000      10.9       118       136        60
OIR    2025250    183200   18.5400  145.0800      11.0       120       132        60
OIR    2025250    183200   18.5400  145.0600      11.0       121       132        60
OIR    2025250    183200   18.5400  145.0400      11.1       122       132        60
OIR    2025250    183200   18.5400  145.0200      11.2       123       132        60
OIR    2025250    183200   18.5400  145.0000      11.7       127       132        60
OIR    2025250    183200   18.5400  144.9800      12.1       129       132        60
OIR    2025250    183200   18.5400  144.9600      12.5       130       132        60
OIR    2025250    183200   18.5400  144.9400      12.8       132       128        60
OIR    2025250    183200   18.5400  144.9200      13.0       133       128        60
OIR    2025250    183200   18.5400  144.9000      13.2       134       132        60
OIR    2025250    183200   18.5400  144.8800      13.3       135       132        60
OIR    2025250    183200   18.5400  144.8600      13.4       135       128        60
OIR    2025250    183200   18.5400  144.8400      13.5       136       136        60
OIR    2025250    183200   18.5400  144.8200      13.6       137       132        60
OIR    2025250    183200   18.5400  144.8000      13.7       138       132        60
OIR    2025250    183200   18.5400  144.7800      13.9       139       128        60
OIR    2025250    183200   18.5400  144.7600      14.0       141       132        60
OIR    2025250    183200   18.5400  144.7400      14.2       145       128        60
OIR    2025250    183200   18.5400  144.7200      14.2       146       132        60
OIR    2025250    183200   18.5400  144.7000      14.2       147       132        60
OIR    2025250    183200   18.5400  144.6800      14.2       148       136        60
OIR    2025250    183200   18.5400  144.6600      14.1       148       132        60
OIR    2025250    183200   18.5200  145.1200      10.8       116       140        60
OIR    2025250    183200   18.5200  145.1000      10.8       118       136        60
OIR    2025250    183200   18.5200  145.0800      10.9       119       132        60
OIR    2025250    183200   18.5200  145.0600      10.9       120       132        60
OIR    2025250    183200   18.5200  145.0400      11.0       122       132        60
OIR    2025250    183200   18.5200  145.0200      11.0       123       136        60
OIR    2025250    183200   18.5200  145.0000      11.5       126       132        60
OIR    2025250    183200   18.5200  144.9800      11.9       128       132        60
OIR    2025250    183200   18.5200  144.9600      12.2       130       132        60
OIR    2025250    183200   18.5200  144.9400      12.4       131       132        60
OIR    2025250    183200   18.5200  144.9200      12.6       133       136        60
OIR    2025250    183200   18.5200  144.9000      12.9       134       136        60
OIR    2025250    183200   18.5200  144.8800      13.1       135       132        60
OIR    2025250    183200   18.5200  144.8600      13.2       135       132        60
OIR    2025250    183200   18.5200  144.8400      13.4       136       132        60
OIR    2025250    183200   18.5200  144.8200      13.5       137       136        60
OIR    2025250    183200   18.5200  144.8000      13.7       138       136        60
OIR    2025250    183200   18.5200  144.7800      13.8       139       136        60
OIR    2025250    183200   18.5200  144.7600      13.9       142       132        60
OIR    2025250    183200   18.5200  144.7400      14.1       145       132        60
OIR    2025250    183200   18.5200  144.7200      14.3       147       132        60
OIR    2025250    183200   18.5200  144.7000      14.3       148       132        60
OIR    2025250    183200   18.5200  144.6800      14.2       149       136        60
OIR    2025250    183200   18.5200  144.6600      14.1       149       140        60
OIR    2025250    183200   18.5000  145.1200      10.6       116       136        60
OIR    2025250    183200   18.5000  145.1000      10.7       117       128        60
OIR    2025250    183200   18.5000  145.0800      10.8       119       136        60
OIR    2025250    183200   18.5000  145.0600      10.8       120       132        60
OIR    2025250    183200   18.5000  145.0400      10.9       121       128        60
OIR    2025250    183200   18.5000  145.0200      11.0       123       132        60
OIR    2025250    183200   18.5000  145.0000      11.4       126       132        60
OIR    2025250    183200   18.5000  144.9800      11.7       128       132        60
OIR    2025250    183200   18.5000  144.9600      11.9       130       132        60
OIR    2025250    183200   18.5000  144.9400      12.1       131       128        60
OIR    2025250    183200   18.5000  144.9200      12.3       132       132        60
OIR    2025250    183200   18.5000  144.9000      12.6       133       128        60
OIR    2025250    183200   18.5000  144.8800      12.8       134       128        60
OIR    2025250    183200   18.5000  144.8600      13.1       135       136        60
OIR    2025250    183200   18.5000  144.8400      13.3       136       136        60
OIR    2025250    183200   18.5000  144.8200      13.4       137       136        60
OIR    2025250    183200   18.5000  144.8000      13.5       138       132        60
OIR    2025250    183200   18.5000  144.7800      13.6       139       132        60
OIR    2025250    183200   18.5000  144.7600      13.8       141       136        60
OIR    2025250    183200   18.5000  144.7400      14.0       146       132        60
OIR    2025250    183200   18.5000  144.7200      14.2       148       132        60
OIR    2025250    183200   18.5000  144.7000      14.3       149       136        60
OIR    2025250    183200   18.5000  144.6800      14.3       150       132        60
OIR    2025250    183200   18.5000  144.6600      14.2       151       136        60
OIR    2025250    183200   18.5000  144.6000      14.5       156       132        60
OIR    2025250    183200   18.4800  145.1600      10.5       112       140        60
OIR    2025250    183200   18.4800  145.1400      10.4       113       132        60
OIR    2025250    183200   18.4800  145.1200      10.5       115       136        60
OIR    2025250    183200   18.4800  145.1000      10.6       117       136        60
OIR    2025250    183200   18.4800  145.0800      10.7       119       132        60
OIR    2025250    183200   18.4800  145.0600      10.8       120       132        60
OIR    2025250    183200   18.4800  145.0400      10.8       121       136        60
OIR    2025250    183200   18.4800  145.0200      11.0       123       136        60
OIR    2025250    183200   18.4800  145.0000      11.4       127       132        60
OIR    2025250    183200   18.4800  144.9800      11.6       128       132        60
OIR    2025250    183200   18.4800  144.9600      11.8       130       128        60
OIR    2025250    183200   18.4800  144.9400      11.9       131       136        60
OIR    2025250    183200   18.4800  144.9200      12.0       132       132        60
OIR    2025250    183200   18.4800  144.9000      12.2       133       132        60
OIR    2025250    183200   18.4800  144.8800      12.5       134       132        60
OIR    2025250    183200   18.4800  144.8600      12.9       135       140        60
OIR    2025250    183200   18.4800  144.8400      13.1       136       136        60
OIR    2025250    183200   18.4800  144.8200      13.2       137       140        60
OIR    2025250    183200   18.4800  144.8000      13.3       138       136        60
OIR    2025250    183200   18.4800  144.7800      13.4       139       136        60
OIR    2025250    183200   18.4800  144.7600      13.5       141       132        60
OIR    2025250    183200   18.4800  144.7400      13.9       147       136        60
OIR    2025250    183200   18.4600  145.1600      10.2       110       136        60
OIR    2025250    183200   18.4600  145.1400      10.2       112       132        60
OIR    2025250    183200   18.4600  145.1200      10.3       114       136        60
OIR    2025250    183200   18.4600  145.1000      10.5       116       136        60
OIR    2025250    183200   18.4600  145.0800      10.6       118       136        60
OIR    2025250    183200   18.4600  145.0600      10.7       120       136        60
OIR    2025250    183200   18.4600  145.0400      10.8       121       140        60
OIR    2025250    183200   18.4600  145.0200      11.0       123       132        60
OIR    2025250    183200   18.4600  145.0000      11.4       128       136        60
OIR    2025250    183200   18.4600  144.9800      11.5       128       132        60
OIR    2025250    183200   18.4600  144.9600      11.6       129       132        60
OIR    2025250    183200   18.4600  144.9400      11.7       130       132        60
OIR    2025250    183200   18.4600  144.9200      11.9       131       136        60
OIR    2025250    183200   18.4600  144.9000      12.0       132       132        60
OIR    2025250    183200   18.4600  144.8800      12.2       133       132        60
OIR    2025250    183200   18.4600  144.8600      12.5       135       136        60
OIR    2025250    183200   18.4600  144.8400      12.8       136       140        60
OIR    2025250    183200   18.4600  144.8200      13.0       137       144        60
OIR    2025250    183200   18.4600  144.7400      13.7       146       136        60
OIR    2025250    183200   18.4400  145.1800      10.1       107       140        60
OIR    2025250    183200   18.4400  145.1600      10.0       109       136        60
OIR    2025250    183200   18.4400  145.1400      10.0       110       136        60
OIR    2025250    183200   18.4400  145.1200      10.1       112       132        60
OIR    2025250    183200   18.4400  145.1000      10.3       114       136        60
OIR    2025250    183200   18.4400  145.0800      10.5       117       136        60
OIR    2025250    183200   18.4400  145.0600      10.6       119       136        60
OIR    2025250    183200   18.4400  145.0400      10.7       121       132        60
OIR    2025250    183200   18.4400  145.0200      10.9       123       136        60
OIR    2025250    183200   18.4400  145.0000      11.3       128       136        60
OIR    2025250    183200   18.4400  144.9800      11.4       129       132        60
OIR    2025250    183200   18.4400  144.9600      11.5       130       132        60
OIR    2025250    183200   18.4400  144.9400      11.6       131       136        60
OIR    2025250    183200   18.4400  144.9200      11.7       131       136        60
OIR    2025250    183200   18.4400  144.9000      11.8       132       136        60
OIR    2025250    183200   18.4400  144.8800      12.0       133       132        60
OIR    2025250    183200   18.4400  144.8600      12.2       134       140        60
OIR    2025250    183200   18.4400  144.8400      12.4       135       140        60
OIR    2025250    183200   18.4400  144.8200      12.6       137       144        60
OIR    2025250    183200   18.4200  145.1800       9.9       105       136        60
OIR    2025250    183200   18.4200  145.1600       9.9       107       132        60
OIR    2025250    183200   18.4200  145.1400       9.8       108       136        60
OIR    2025250    183200   18.4200  145.1200       9.9       110       132        60
OIR    2025250    183200   18.4200  145.1000      10.1       112       136        60
OIR    2025250    183200   18.4200  145.0800      10.2       115       136        60
OIR    2025250    183200   18.4200  145.0600      10.4       118       132        60
OIR    2025250    183200   18.4200  145.0400      10.6       120       136        60
OIR    2025250    183200   18.4200  145.0200      10.8       123       132        60
OIR    2025250    183200   18.4200  145.0000      11.3       128       136        60
OIR    2025250    183200   18.4200  144.9800      11.4       129       128        60
OIR    2025250    183200   18.4200  144.9600      11.5       130       128        60
OIR    2025250    183200   18.4200  144.9400      11.6       131       128        60
OIR    2025250    183200   18.4200  144.9200      11.6       131       128        60
OIR    2025250    183200   18.4200  144.9000      11.7       132       128        60
OIR    2025250    183200   18.4200  144.8800      11.8       133       132        60
OIR    2025250    183200   18.4200  144.8600      11.9       134       132        60
OIR    2025250    183200   18.4200  144.8400      12.1       135       136        60
OIR    2025250    183200   18.4200  144.8200      12.3       136       136        60
OIR    2025250    183200   18.4200  144.8000      12.4       138       136        60
OIR    2025250    183200   18.4200  144.7800      12.5       139       140        60
OIR    2025250    183200   18.4200  144.7600      12.6       141       140        60
OIR    2025250    183200   18.4000  145.2000      10.0       102       140        60
OIR    2025250    183200   18.4000  145.1800       9.9       104       136        60
OIR    2025250    183200   18.4000  145.1600       9.8       106       136        60
OIR    2025250    183200   18.4000  145.1400       9.7       107       132        60
OIR    2025250    183200   18.4000  145.1200       9.8       109       128        60
OIR    2025250    183200   18.4000  145.1000       9.8       110       132        60
OIR    2025250    183200   18.4000  145.0800      10.0       113       128        60
OIR    2025250    183200   18.4000  145.0600      10.2       116       132        60
OIR    2025250    183200   18.4000  145.0400      10.4       119       128        60
OIR    2025250    183200   18.4000  145.0200      10.7       122       128        60
OIR    2025250    183200   18.4000  145.0000      11.2       127       128        60
OIR    2025250    183200   18.4000  144.9800      11.4       129       132        60
OIR    2025250    183200   18.4000  144.9600      11.5       130       128        60
OIR    2025250    183200   18.4000  144.9400      11.5       131       128        60
OIR    2025250    183200   18.4000  144.9200      11.6       132       123        60
OIR    2025250    183200   18.4000  144.9000      11.6       132       132        60
OIR    2025250    183200   18.4000  144.8800      11.6       133       128        60
OIR    2025250    183200   18.4000  144.8600      11.7       134       132        60
OIR    2025250    183200   18.4000  144.8400      11.8       135       128        60
OIR    2025250    183200   18.4000  144.8200      12.0       136       132        60
OIR    2025250    183200   18.4000  144.8000      12.1       138       132        60
OIR    2025250    183200   18.4000  144.7800      12.2       140       132        60
OIR    2025250    183200   18.4000  144.7600      12.3       142       140        60
OIR    2025250    183200   18.3800  145.2200      10.1        98       136        60
OIR    2025250    183200   18.3800  145.2000       9.9       101       136        60
OIR    2025250    183200   18.3800  145.1800       9.7       103       136        60
OIR    2025250    183200   18.3800  145.1600       9.6       104       136        60
OIR    2025250    183200   18.3800  145.1400       9.6       106       128        60
OIR    2025250    183200   18.3800  145.1200       9.6       108       128        60
OIR    2025250    183200   18.3800  145.1000       9.6       108       128        60
OIR    2025250    183200   18.3800  145.0800       9.7       110       132        60
OIR    2025250    183200   18.3800  145.0600       9.7       113       128        60
OIR    2025250    183200   18.3800  145.0400       9.9       116       128        60
OIR    2025250    183200   18.3800  145.0200      10.3       121       123        60
OIR    2025250    183200   18.3800  145.0000      10.9       126       115        60
OIR    2025250    183200   18.3800  144.9800      11.3       129       128        60
OIR    2025250    183200   18.3800  144.9600      11.4       130       128        60
OIR    2025250    183200   18.3800  144.9400      11.5       131       123        60
OIR    2025250    183200   18.3800  144.9200      11.5       132       128        60
OIR    2025250    183200   18.3800  144.9000      11.5       132       123        60
OIR    2025250    183200   18.3800  144.8800      11.6       133       132        60
OIR    2025250    183200   18.3800  144.8600      11.6       134       128        60
OIR    2025250    183200   18.3800  144.8400      11.7       135       136        60
OIR    2025250    183200   18.3800  144.8200      11.8       136       132        60
OIR    2025250    183200   18.3800  144.8000      11.9       138       132        60
OIR    2025250    183200   18.3800  144.7800      12.0       141       140        60
OIR    2025250    183200   18.3800  144.7600      12.2       143       140        60
OIR    2025250    183200   18.3800  144.7400      12.4       147       144        60
OIR    2025250    183200   18.3600  145.2200      10.1        96       136        60
OIR    2025250    183200   18.3600  145.2000       9.6        99       132        60
OIR    2025250    183200   18.3600  145.1800       9.4       101       132        60
OIR    2025250    183200   18.3600  145.1600       9.4       103       136        60
OIR    2025250    183200   18.3600  145.1400       9.4       104       132        60
OIR    2025250    183200   18.3600  145.1200       9.5       106       128        60
OIR    2025250    183200   18.3600  145.1000       9.5       107       128        60
OIR    2025250    183200   18.3600  145.0800       9.4       107       128        60
OIR    2025250    183200   18.3600  145.0600       9.3       109       123        60
OIR    2025250    183200   18.3600  145.0400       9.3       111       123        60
OIR    2025250    183200   18.3600  145.0200       9.7       117       119        60
OIR    2025250    183200   18.3600  145.0000      10.3       122       119        60
OIR    2025250    183200   18.3600  144.9800      11.0       128       123        60
OIR    2025250    183200   18.3600  144.9600      11.3       130       128        60
OIR    2025250    183200   18.3600  144.9400      11.4       131       123        60
OIR    2025250    183200   18.3600  144.9200      11.4       132       132        60
OIR    2025250    183200   18.3600  144.9000      11.4       132       132        60
OIR    2025250    183200   18.3600  144.8800      11.5       133       128        60
OIR    2025250    183200   18.3600  144.8600      11.5       134       132        60
OIR    2025250    183200   18.3600  144.8400      11.6       135       132        60
OIR    2025250    183200   18.3600  144.8200      11.7       137       140        60
OIR    2025250    183200   18.3600  144.8000      11.8       139       140        60
OIR    2025250    183200   18.3600  144.7800      11.9       142       136        60
OIR    2025250    183200   18.3600  144.7600      12.1       145       136        60
OIR    2025250    183200   18.3600  144.7400      12.3       149       144        60
OIR    2025250    183200   18.3400  145.2200       9.8        95       136        60
OIR    2025250    183200   18.3400  145.2000       9.4        97       128        60
OIR    2025250    183200   18.3400  145.1800       9.3        99       128        60
OIR    2025250    183200   18.3400  145.1600       9.2       101       132        60
OIR    2025250    183200   18.3400  145.1400       9.2       103       128        60
OIR    2025250    183200   18.3400  145.1200       9.3       104       123        60
OIR    2025250    183200   18.3400  145.1000       9.3       105       119        60
OIR    2025250    183200   18.3400  145.0800       9.2       105       123        60
OIR    2025250    183200   18.3400  145.0600       9.1       106       123        60
OIR    2025250    183200   18.3400  145.0400       9.0       107       123        60
OIR    2025250    183200   18.3400  145.0200       9.0       110       119        60
OIR    2025250    183200   18.3400  145.0000       9.3       116       128        60
OIR    2025250    183200   18.3400  144.9800      10.0       123       128        60
OIR    2025250    183200   18.3400  144.9600      10.7       128       132        60
OIR    2025250    183200   18.3400  144.9400      11.1       130       132        60
OIR    2025250    183200   18.3400  144.9200      11.2       132       132        60
OIR    2025250    183200   18.3400  144.9000      11.3       133       128        60
OIR    2025250    183200   18.3400  144.8800      11.3       133       128        60
OIR    2025250    183200   18.3400  144.8600      11.4       135       132        60
OIR    2025250    183200   18.3400  144.8400      11.4       136       132        60
OIR    2025250    183200   18.3400  144.8200      11.5       138       136        60
OIR    2025250    183200   18.3400  144.8000      11.7       141       140        60
OIR    2025250    183200   18.3400  144.7800      11.8       143       140        60
OIR    2025250    183200   18.3400  144.7600      12.0       147       140        60
OIR    2025250    183200   18.3200  145.2200       9.7        93       132        60
OIR    2025250    183200   18.3200  145.2000       9.4        96       132        60
OIR    2025250    183200   18.3200  145.1800       9.2        98       123        60
OIR    2025250    183200   18.3200  145.1600       9.2       100       119        60
OIR    2025250    183200   18.3200  145.1400       9.1       101       123        60
OIR    2025250    183200   18.3200  145.1200       9.1       102       115        60
OIR    2025250    183200   18.3200  145.1000       9.1       102       119        60
OIR    2025250    183200   18.3200  145.0800       9.1       103       123        60
OIR    2025250    183200   18.3200  145.0600       9.0       104       115        60
OIR    2025250    183200   18.3200  145.0400       9.0       106       128        60
OIR    2025250    183200   18.3200  145.0200       8.9       108       128        60
OIR    2025250    183200   18.3200  145.0000       9.1       114       119        60
OIR    2025250    183200   18.3200  144.9800       9.6       122       128        60
OIR    2025250    183200   18.3200  144.9600      10.2       126       128        60
OIR    2025250    183200   18.3200  144.9400      10.7       129       132        60
OIR    2025250    183200   18.3200  144.9200      10.9       131       123        60
OIR    2025250    183200   18.3200  144.9000      11.0       133       132        60
OIR    2025250    183200   18.3200  144.8800      11.0       134       132        60
OIR    2025250    183200   18.3200  144.8600      11.2       135       128        60
OIR    2025250    183200   18.3200  144.8400      11.3       137       132        60
OIR    2025250    183200   18.3200  144.8200      11.4       139       136        60
OIR    2025250    183200   18.3200  144.8000      11.6       142       132        60
OIR    2025250    183200   18.3200  144.7800      11.8       144       136        60
OIR    2025250    183200   18.3200  144.7600      12.0       148       140        60
OIR    2025250    183200   18.3200  144.7400      12.4       152       136        60
OIR    2025250    183200   18.3000  145.2400      10.0        90       136        60
OIR    2025250    183200   18.3000  145.2200       9.7        92       132        60
OIR    2025250    183200   18.3000  145.2000       9.4        95       128        60
OIR    2025250    183200   18.3000  145.1800       9.2        97       123        60
OIR    2025250    183200   18.3000  145.1600       9.2        98       123        60
OIR    2025250    183200   18.3000  145.1400       9.1        99       119        60
OIR    2025250    183200   18.3000  145.1200       9.1       100       119        60
OIR    2025250    183200   18.3000  145.1000       9.1       101       111        60
OIR    2025250    183200   18.3000  145.0800       9.0       102       123        60
OIR    2025250    183200   18.3000  145.0600       9.0       103       115        60
OIR    2025250    183200   18.3000  145.0400       9.0       105       123        60
OIR    2025250    183200   18.3000  145.0200       8.9       108       123        60
OIR    2025250    183200   18.3000  145.0000       9.1       113       123        60
OIR    2025250    183200   18.3000  144.9800       9.5       120       123        60
OIR    2025250    183200   18.3000  144.9600       9.9       124       123        60
OIR    2025250    183200   18.3000  144.9400      10.3       128       128        60
OIR    2025250    183200   18.3000  144.9200      10.6       131       128        60
OIR    2025250    183200   18.3000  144.9000      10.8       133       128        60
OIR    2025250    183200   18.3000  144.8800      10.9       134       136        60
OIR    2025250    183200   18.3000  144.8600      11.0       135       128        60
OIR    2025250    183200   18.3000  144.8400      11.2       137       132        60
OIR    2025250    183200   18.3000  144.8200      11.4       140       136        60
OIR    2025250    183200   18.3000  144.8000      11.7       143       136        60
OIR    2025250    183200   18.3000  144.7800      12.0       146       136        60
OIR    2025250    183200   18.3000  144.7600      12.2       150       136        60
OIR    2025250    183200   18.3000  144.7400      12.6       153       132        60
OIR    2025250    183200   18.2800  145.2400      10.0        88       132        60
OIR    2025250    183200   18.2800  145.2200       9.7        91       132        60
OIR    2025250    183200   18.2800  145.2000       9.4        93       132        60
OIR    2025250    183200   18.2800  145.1800       9.3        96       123        60
OIR    2025250    183200   18.2800  145.1600       9.2        97       119        60
OIR    2025250    183200   18.2800  145.1400       9.2        99       123        60
OIR    2025250    183200   18.2800  145.1200       9.1        99       119        60
OIR    2025250    183200   18.2800  145.1000       9.0       100       119        60
OIR    2025250    183200   18.2800  145.0800       9.0       101       123        60
OIR    2025250    183200   18.2800  145.0600       9.0       102       119        60
OIR    2025250    183200   18.2800  145.0400       9.0       104       128        60
OIR    2025250    183200   18.2800  145.0200       8.9       106       132        60
OIR    2025250    183200   18.2800  145.0000       9.0       112       128        60
OIR    2025250    183200   18.2800  144.9800       9.4       120       128        60
OIR    2025250    183200   18.2800  144.9600       9.7       123       123        60
OIR    2025250    183200   18.2800  144.9400      10.0       127       119        60
OIR    2025250    183200   18.2800  144.9200      10.4       130       132        60
OIR    2025250    183200   18.2800  144.9000      10.6       132       123        60
OIR    2025250    183200   18.2800  144.8800      10.8       134       132        60
OIR    2025250    183200   18.2800  144.8600      11.0       135       128        60
OIR    2025250    183200   18.2800  144.8400      11.2       138       140        60
OIR    2025250    183200   18.2800  144.8200      11.5       141       140        60
OIR    2025250    183200   18.2800  144.8000      11.8       145       136        60
OIR    2025250    183200   18.2800  144.7800      12.2       148       132        60
OIR    2025250    183200   18.2800  144.7600      12.5       152       136        60
OIR    2025250    183200   18.2800  144.7400      12.9       156       140        60
OIR    2025250    183200   18.2600  145.2800      10.4        86       136        60
OIR    2025250    183200   18.2600  145.2600      10.2        87       132        60
OIR    2025250    183200   18.2600  145.2400      10.0        88       128        60
OIR    2025250    183200   18.2600  145.2200       9.8        89       123        60
OIR    2025250    183200   18.2600  145.2000       9.6        92       123        60
OIR    2025250    183200   18.2600  145.1800       9.4        94       119        60
OIR    2025250    183200   18.2600  145.1600       9.3        96       119        60
OIR    2025250    183200   18.2600  145.1400       9.2        98       119        60
OIR    2025250    183200   18.2600  145.1200       9.1        99       119        60
OIR    2025250    183200   18.2600  145.1000       9.0        99       115        60
OIR    2025250    183200   18.2600  145.0800       9.0       100       119        60
OIR    2025250    183200   18.2600  145.0600       9.0       101       128        60
OIR    2025250    183200   18.2600  145.0400       8.9       102       123        60
OIR    2025250    183200   18.2600  145.0200       8.9       105       132        60
OIR    2025250    183200   18.2600  145.0000       9.0       111       119        60
OIR    2025250    183200   18.2600  144.9800       9.4       119       128        60
OIR    2025250    183200   18.2600  144.9600       9.7       122       128        60
OIR    2025250    183200   18.2600  144.9400       9.9       126       132        60
OIR    2025250    183200   18.2600  144.9200      10.4       130       128        60
OIR    2025250    183200   18.2600  144.9000      10.6       132       128        60
OIR    2025250    183200   18.2600  144.8800      10.8       134       136        60
OIR    2025250    183200   18.2600  144.8600      10.9       135       132        60
OIR    2025250    183200   18.2600  144.8400      11.1       138       132        60
OIR    2025250    183200   18.2600  144.8200      11.5       142       136        60
OIR    2025250    183200   18.2600  144.8000      11.9       146       140        60
OIR    2025250    183200   18.2600  144.7800      12.4       150       136        60
OIR    2025250    183200   18.2600  144.7600      12.9       154       136        60
OIR    2025250    183200   18.2400  145.2800      10.3        86       136        60
OIR    2025250    183200   18.2400  145.2600      10.2        86       128        60
OIR    2025250    183200   18.2400  145.2400      10.1        87       128        60
OIR    2025250    183200   18.2400  145.2200       9.9        89       123        60
OIR    2025250    183200   18.2400  145.2000       9.8        91       123        60
OIR    2025250    183200   18.2400  145.1800       9.6        93       119        60
OIR    2025250    183200   18.2400  145.1600       9.4        95       123        60
OIR    2025250    183200   18.2400  145.1400       9.2        96       123        60
OIR    2025250    183200   18.2400  145.1200       9.1        98       123        60
OIR    2025250    183200   18.2400  145.1000       9.0        99       119        60
OIR    2025250    183200   18.2400  145.0800       9.0       100       119        60
OIR    2025250    183200   18.2400  145.0600       8.9       100       128        60
OIR    2025250    183200   18.2400  145.0400       8.8       101       123        60
OIR    2025250    183200   18.2400  145.0200       8.8       103       128        60
OIR    2025250    183200   18.2400  145.0000       8.9       110       132        60
OIR    2025250    183200   18.2400  144.9800       9.5       119       136        60
OIR    2025250    183200   18.2400  144.9600       9.7       122       132        60
OIR    2025250    183200   18.2400  144.9400      10.1       126       128        60
OIR    2025250    183200   18.2400  144.9200      10.5       130       132        60
OIR    2025250    183200   18.2400  144.9000      10.7       132       128        60
OIR    2025250    183200   18.2400  144.8800      10.8       133       136        60
OIR    2025250    183200   18.2400  144.8600      11.0       135       132        60
OIR    2025250    183200   18.2400  144.8400      11.1       138       132        60
OIR    2025250    183200   18.2400  144.8200      11.6       142       136        60
OIR    2025250    183200   18.2400  144.8000      12.1       147       136        60
OIR    2025250    183200   18.2400  144.7800      12.7       152       136        60
OIR    2025250    183200   18.2400  144.7600      13.2       156       136        60
OIR    2025250    183200   18.2400  144.7400      13.6       159       132        60
OIR    2025250    183200   18.2200  145.3000      10.4        85       136        60
OIR    2025250    183200   18.2200  145.2800      10.3        85       136        60
OIR    2025250    183200   18.2200  145.2600      10.2        86       132        60
OIR    2025250    183200   18.2200  145.2400      10.2        87       132        60
OIR    2025250    183200   18.2200  145.2200      10.1        89       128        60
OIR    2025250    183200   18.2200  145.2000      10.0        90       123        60
OIR    2025250    183200   18.2200  145.1800       9.8        92       119        60
OIR    2025250    183200   18.2200  145.1600       9.5        94       115        60
OIR    2025250    183200   18.2200  145.1400       9.2        95       119        60
OIR    2025250    183200   18.2200  145.1200       9.1        97       123        60
OIR    2025250    183200   18.2200  145.1000       9.0        98       119        60
OIR    2025250    183200   18.2200  145.0800       8.9        99       123        60
OIR    2025250    183200   18.2200  145.0600       8.8       100       132        60
OIR    2025250    183200   18.2200  145.0400       8.8       100       128        60
OIR    2025250    183200   18.2200  145.0200       8.7       102       128        60
OIR    2025250    183200   18.2200  145.0000       8.9       108       132        60
OIR    2025250    183200   18.2200  144.9800       9.3       115       132        60
OIR    2025250    183200   18.2200  144.9600       9.9       122       128        60
OIR    2025250    183200   18.2200  144.9400      10.3       126       132        60
OIR    2025250    183200   18.2200  144.9200      10.6       129       132        60
OIR    2025250    183200   18.2200  144.9000      10.8       131       136        60
OIR    2025250    183200   18.2200  144.8800      10.9       133       132        60
OIR    2025250    183200   18.2200  144.8600      11.0       134       132        60
OIR    2025250    183200   18.2200  144.8400      11.2       137       132        60
OIR    2025250    183200   18.2200  144.8200      11.7       142       140        60
OIR    2025250    183200   18.2200  144.8000      12.4       148       136        60
OIR    2025250    183200   18.2200  144.7800      13.1       153       136        60
OIR    2025250    183200   18.2200  144.7600      13.6       157       132        60
OIR    2025250    183200   18.2200  144.7400      13.9       160       136        60
OIR    2025250    183200   18.2000  145.3000      10.3        84       132        60
OIR    2025250    183200   18.2000  145.2800      10.3        85       136        60
OIR    2025250    183200   18.2000  145.2600      10.3        86       132        60
OIR    2025250    183200   18.2000  145.2400      10.2        87       123        60
OIR    2025250    183200   18.2000  145.2200      10.1        88       123        60
OIR    2025250    183200   18.2000  145.2000      10.0        90       128        60
OIR    2025250    183200   18.2000  145.1800       9.9        91       115        60
OIR    2025250    183200   18.2000  145.1600       9.5        92       123        60
OIR    2025250    183200   18.2000  145.1400       9.3        94       123        60
OIR    2025250    183200   18.2000  145.1200       9.1        95       119        60
OIR    2025250    183200   18.2000  145.1000       9.0        97       128        60
OIR    2025250    183200   18.2000  145.0800       8.9        98       123        60
OIR    2025250    183200   18.2000  145.0600       8.7        99       132        60
OIR    2025250    183200   18.2000  145.0400       8.7       100       132        60
OIR    2025250    183200   18.2000  145.0200       8.7       101       128        60
OIR    2025250    183200   18.2000  145.0000       8.8       105       132        60
OIR    2025250    183200   18.2000  144.9800       9.4       113       140        60
OIR    2025250    183200   18.2000  144.9600      10.1       122       140        60
OIR    2025250    183200   18.2000  144.9400      10.5       126       140        60
OIR    2025250    183200   18.2000  144.9200      10.9       129       140        60
OIR    2025250    183200   18.2000  144.9000      11.0       131       136        60
OIR    2025250    183200   18.2000  144.8800      11.1       132       140        60
OIR    2025250    183200   18.2000  144.8600      11.1       133       136        60
OIR    2025250    183200   18.2000  144.8400      11.3       135       140        60
OIR    2025250    183200   18.2000  144.8200      11.7       139       140        60
OIR    2025250    183200   18.2000  144.7400      14.1       160       140        60
OIR    2025250    183200   18.1800  145.3000      10.3        84       136        60
OIR    2025250    183200   18.1800  145.2800      10.2        85       136        60
OIR    2025250    183200   18.1800  145.2600      10.3        85       128        60
OIR    2025250    183200   18.1800  145.2400      10.2        86       123        60
OIR    2025250    183200   18.1800  145.2200      10.1        88       128        60
OIR    2025250    183200   18.1800  145.2000      10.0        89       128        60
OIR    2025250    183200   18.1800  145.1800       9.7        90       128        60
OIR    2025250    183200   18.1800  145.1600       9.4        90       132        60
OIR    2025250    183200   18.1800  145.1400       9.2        91       123        60
OIR    2025250    183200   18.1800  145.1200       9.1        93       123        60
OIR    2025250    183200   18.1800  145.1000       8.9        95       123        60
OIR    2025250    183200   18.1800  145.0800       8.7        97       123        60
OIR    2025250    183200   18.1600  145.3000      10.2        84       136        60
OIR    2025250    183200   18.1600  145.2800      10.2        84       136        60
OIR    2025250    183200   18.1600  145.2600      10.2        85       132        60
OIR    2025250    183200   18.1600  145.2400      10.2        86       128        60
OIR    2025250    183200   18.1600  145.2200      10.1        87       128        60
OIR    2025250    183200   18.1600  145.2000       9.9        88       136        60
OIR    2025250    183200   18.1600  145.1800       9.6        89       136        60
OIR    2025250    183200   18.1600  145.1600       9.4        89       136        60
OIR    2025250    183200   18.1600  145.1400       9.2        90       132        60
OIR    2025250    183200   18.1600  145.1200       9.0        92       132        60
OIR    2025250    183200   18.1600  145.1000       8.8        94       132        60
OIR    2025250    183200   18.1400  145.2800      10.1        84       132        60
OIR    2025250    183200   18.1400  145.2600      10.1        84       132        60
OIR    2025250    183200   18.1400  145.2400      10.1        85       115        60
OIR    2025250    183200   18.1400  145.2200      10.0        86       136        60
OIR    2025250    183200   18.1400  145.1800       9.5        88       132        60
OIR    2025250    183200   18.1400  145.1600       9.4        89       132        60
OIR    2025250    183200   18.1400  145.1400       9.2        89       136        60
OIR    2025250    183200   18.1200  145.3000      10.0        83       136        60
OIR    2025250    183200   18.1200  145.2800      10.0        83       136        60
OIR    2025250    183200   18.1200  145.2600      10.0        83       136        60
OIR    2025250    183200   18.1200  145.2400      10.0        84       140        60
OIR    2025250    183200   18.1200  145.2000       9.7        86       132        60
OIR    2025250    183200   18.1200  145.1800       9.5        87       132        60
OIR    2025250    183200   18.1000  145.2800      10.0        82       140        60
OIR    2025250    183200   18.1000  145.2400       9.9        83       140        60
OIR    2025250    183200   15.9600  144.6000       5.0       257       136        60
