type     day        hms     lat       lon         spd        dir       pre        qi
IR     2025250    200200   23.7600  152.1200       4.7       104       967        69
IR     2025250    200200   23.6600  150.1800       6.2        80       955        95
IR     2025250    200200   23.6800  150.1600       6.2        80       948        96
IR     2025250    200200   23.7200  150.0600       6.3        89       921        91
IR     2025250    200200   23.6600  149.9500       8.0       108       894        78
IR     2025250    200200   23.7400  149.7900      11.0       128       866        73
IR     2025250    200200   23.6100  146.4400      10.1       122       917        80
IR     2025250    200200   23.6300  146.4000      10.5       120       915        82
IR     2025250    200200   23.6100  146.2800      10.6       116       913        76
IR     2025250    200200   23.6700  152.0200       4.3       111       959        78
IR     2025250    200200   23.5600  150.2700       6.3        94       961        89
IR     2025250    200200   23.5600  150.2500       6.1        95       956        96
IR     2025250    200200   23.6400  150.0900       6.4        79       936        86
IR     2025250    200200   23.6200  149.9800       7.0        99       904        79
IR     2025250    200200   23.6400  149.9200       8.1       110       883        77
IR     2025250    200200   23.6100  149.8400       8.9       123       875        69
IR     2025250    200200   23.6100  149.6500       8.1       126       808        60
IR     2025250    200200   23.5700  148.0200      11.3       121       935        65
IR     2025250    200200   23.5900  148.0000      11.1       121       933        63
IR     2025250    200200   23.5700  146.4400       9.9       120       918        77
IR     2025250    200200   23.5700  146.3600      10.2       117       918        76
IR     2025250    200200   23.5900  146.3000      10.5       116       915        74
IR     2025250    200200   23.5400  150.2700       6.1        90       961        89
IR     2025250    200200   23.5200  150.2200       5.6        84       954        97
IR     2025250    200200   23.5100  150.0800       6.4        93       948        98
IR     2025250    200200   23.5100  149.9700       6.6       106       908        79
IR     2025250    200200   23.4500  149.8200       6.8       115       875        73
IR     2025250    200200   23.4000  152.0700       4.9        96       984        72
IR     2025250    200200   23.3700  151.4600       6.7       118       943        82
IR     2025250    200200   23.3900  150.1000       6.2        80       941        92
IR     2025250    200200   23.3900  150.0600       6.4        90       928        95
IR     2025250    200200   23.3900  149.9600       6.5       103       886        83
IR     2025250    200200   23.3400  149.7900       5.8       107       874        91
IR     2025250    200200   23.3400  149.7200       5.1       103       870        70
IR     2025250    200200   23.3600  152.1700       4.6        90       988        70
IR     2025250    200200   23.2800  151.9500       4.9       103       959        97
IR     2025250    200200   23.3100  150.1600       6.3        58       941        74
IR     2025250    200200   23.2800  150.0500       6.9        97       891        74
IR     2025250    200200   23.2600  150.0300       6.9        99       879        74
IR     2025250    200200   23.3200  149.9100       6.8       109       880        94
IR     2025250    200200   23.3000  149.7600       5.6       105       873        93
IR     2025250    200200   23.2400  148.6600      11.6       129       930        76
IR     2025250    200200   23.3000  148.1900       9.1       107       902        68
IR     2025250    200200   23.2000  152.1400       4.9        82       929        84
IR     2025250    200200   23.1700  151.9100       4.9       101       943        92
IR     2025250    200200   23.1700  151.6400       5.2       115       976        74
IR     2025250    200200   23.1400  150.0900       7.0       100       930        99
IR     2025250    200200   23.1200  148.5900      10.3       130       889        60
IR     2025250    200200   23.1100  148.2600       9.8       115       880        63
IR     2025250    200200   23.0700  152.1900       5.3        75       917        73
IR     2025250    200200   23.1300  151.8400       4.9       103       965        97
IR     2025250    200200   23.0400  150.2300       9.4       115       932        85
IR     2025250    200200   23.0800  150.1100       8.2       111       923        68
IR     2025250    200200   23.1000  150.0700       7.4       106       903        80
IR     2025250    200200   23.1000  149.9600       6.5       105       879        96
IR     2025250    200200   23.0200  148.7200      10.1       128       900        70
IR     2025250    200200   23.0400  148.6400      10.3       129       891        73
IR     2025250    200200   23.1000  148.6000      10.2       131       890        61
IR     2025250    200200   23.0100  148.4700       9.9       128       883        60
IR     2025250    200200   23.0100  148.3900      10.2       127       883        68
IR     2025250    200200   22.9800  151.7000       4.2        83       975        71
IR     2025250    200200   22.9600  151.6500       4.3        84       973        61
IR     2025250    200200   22.9300  150.2100       7.8       107       903        80
IR     2025250    200200   23.0000  150.1600       8.6       112       902        81
IR     2025250    200200   23.0000  150.1000       8.1       113       891        87
IR     2025250    200200   22.9200  148.9300      12.0       127       930        70
IR     2025250    200200   22.9100  148.8300      10.1       124       889        65
IR     2025250    200200   22.9100  148.7100       9.3       124       883        71
IR     2025250    200200   22.9300  148.6700       9.6       128       884        64
IR     2025250    200200   22.9100  148.5000       9.6       127       882        73
IR     2025250    200200   22.9700  148.4100      10.1       128       884        63
IR     2025250    200200   22.9000  151.6200       4.2        82       955        60
IR     2025250    200200   22.8500  151.4900       4.4        87       953        67
IR     2025250    200200   22.8700  150.2700       7.6       106       908        81
IR     2025250    200200   22.8500  150.1800       7.8       105       879        79
IR     2025250    200200   22.8900  150.0400       7.8       115       871        92
IR     2025250    200200   22.8700  148.7900       9.6       121       889        69
IR     2025250    200200   22.8900  148.7100       9.1       123       882        73
IR     2025250    200200   22.8500  148.5600       9.2       121       883        82
IR     2025250    200200   22.8900  148.4600       9.5       125       882        69
IR     2025250    200200   22.8300  151.5700       4.3        83       952        60
IR     2025250    200200   22.8100  151.5100       4.4        90       952        78
IR     2025250    200200   22.8100  151.4500       4.3        92       956        83
IR     2025250    200200   22.7300  150.3100       6.2        85       908        82
IR     2025250    200200   22.8100  150.2200       7.0        94       883        70
IR     2025250    200200   22.7300  148.8900       9.0       117       888        64
IR     2025250    200200   22.7900  148.7600       9.6       123       885        69
IR     2025250    200200   22.7500  148.6700       9.3       121       881        71
IR     2025250    200200   22.7000  148.6100       9.4       121       882        79
IR     2025250    200200   22.6500  151.5700       6.3       107       962        81
IR     2025250    200200   22.6500  151.5500       6.4       108       961        84
IR     2025250    200200   22.6600  151.3600       5.6       108       951        97
IR     2025250    200200   22.6300  150.5700       8.0       106       983        60
IR     2025250    200200   22.6300  150.4900       6.7       103       975        92
IR     2025250    200200   22.6300  150.3900       6.4        98       948        99
IR     2025250    200200   22.7100  150.2500       6.1        80       887        80
IR     2025250    200200   22.6600  149.9100       7.5       113       894        84
IR     2025250    200200   22.6300  148.8800       8.0        97       888        69
IR     2025250    200200   22.6500  148.8700       8.0       100       885        72
IR     2025250    200200   22.5500  151.7700       5.7       101       960        92
IR     2025250    200200   22.5500  151.6600       5.6       100       952        88
IR     2025250    200200   22.5900  150.6900      11.9       124       991        66
IR     2025250    200200   22.5300  150.5400       7.6       107       956        79
IR     2025250    200200   22.5900  150.4000       6.6       100       950        99
IR     2025250    200200   22.5600  149.9900       7.1       106       887        92
IR     2025250    200200   22.5600  149.9600       7.2       108       889        93
IR     2025250    200200   22.5400  149.7800       6.0       105       974        79
IR     2025250    200200   22.5000  148.9100       8.9        92       887        65
IR     2025250    200200   22.5200  148.8100       8.9        98       884        88
IR     2025250    200200   22.5000  148.7900       8.9        96       885        91
IR     2025250    200200   22.4700  151.8600       5.3       100       961        94
IR     2025250    200200   22.4900  151.8400       5.3        96       962        96
IR     2025250    200200   22.4400  151.7100       5.5       104       948        98
IR     2025250    200200   22.5300  151.6400       5.8       100       949        91
IR     2025250    200200   22.4200  150.5700       7.2        90       927        81
IR     2025250    200200   22.4200  150.5500       6.9        90       929        88
IR     2025250    200200   22.4600  150.3700       6.3       100       902        99
IR     2025250    200200   22.4200  148.9900       9.4        75       909        66
IR     2025250    200200   22.4400  148.9300       9.2        83       893        67
IR     2025250    200200   22.4800  148.8500       8.9        88       885        75
IR     2025250    200200   22.3600  145.6200      12.0       119       935        78
IR     2025250    200200   22.3900  145.0200      10.1        97       924        71
IR     2025250    200200   22.3700  144.8700      11.3       101       929        82
IR     2025250    200200   22.4100  144.7800      12.2        93       942        76
IR     2025250    200200   22.4300  144.4800      11.4       107       949        82
IR     2025250    200200   22.4300  144.3600      11.4       107       939        93
IR     2025250    200200   22.4300  144.3400      11.2       107       938        92
IR     2025250    200200   22.3500  144.1900      11.0       103       925        85
IR     2025250    200200   22.4300  151.8500       5.6       106       960        95
IR     2025250    200200   22.4200  151.5800       5.7        99       932        97
IR     2025250    200200   22.3400  150.5600       7.1        77       913        76
IR     2025250    200200   22.3200  150.5400       6.9        79       908        83
IR     2025250    200200   22.4000  150.4000       6.4        96       889        97
IR     2025250    200200   22.4000  150.2300       6.2       107       887        94
IR     2025250    200200   22.3700  149.8000       5.5       103       974        75
IR     2025250    200200   22.3000  149.0500       8.7        96       934        90
IR     2025250    200200   22.3800  148.9400       9.2        82       901        75
IR     2025250    200200   22.3000  148.8300       8.0        83       890        79
IR     2025250    200200   22.2600  145.7700      12.0       113       935        89
IR     2025250    200200   22.2800  145.7100      11.9       117       933        88
IR     2025250    200200   22.3400  145.6300      11.8       120       934        81
IR     2025250    200200   22.3200  145.5300      11.2       116       929        86
IR     2025250    200200   22.3400  145.4300      10.4       108       924        92
IR     2025250    200200   22.3400  145.2700       7.2        93       922        63
IR     2025250    200200   22.3300  145.0500       9.3        96       923        96
IR     2025250    200200   22.3100  144.9500       9.9       106       921        77
IR     2025250    200200   22.3300  144.8900      10.7       106       921        73
IR     2025250    200200   22.2500  144.5800      10.1        98       920        71
IR     2025250    200200   22.2500  144.5400       9.3       100       922        67
IR     2025250    200200   22.2700  144.3500       8.3       109       923        64
IR     2025250    200200   22.2800  144.1700      10.8       104       930        88
IR     2025250    200200   22.2200  150.7500      11.1       127       981        83
IR     2025250    200200   22.2200  150.6100       7.0        83       938        83
IR     2025250    200200   22.2200  150.4600       6.8        73       894        88
IR     2025250    200200   22.2600  149.3000      10.6       125       939        85
IR     2025250    200200   22.2000  148.9800       7.4        94       921        98
IR     2025250    200200   22.2600  148.8300       7.5        83       894        82
IR     2025250    200200   22.2300  148.7800       7.4        84       891        89
IR     2025250    200200   22.1800  145.9200      11.4       104       958        89
IR     2025250    200200   22.2400  145.7900      11.9       112       936        90
IR     2025250    200200   22.2400  145.7700      12.0       113       935        89
IR     2025250    200200   22.1700  145.5800      10.7       120       876        87
IR     2025250    200200   22.1500  145.4800       9.5       119       807        86
IR     2025250    200200   22.1500  145.4600       8.9       120       792        83
IR     2025250    200200   22.1500  145.3400       6.3       125       851        62
IR     2025250    200200   22.2300  145.1600       6.4       102       920        65
IR     2025250    200200   22.1500  144.9800      11.4       114       898        93
IR     2025250    200200   22.1500  144.9600      11.0       114       877        97
IR     2025250    200200   22.1500  144.7800      10.4       111       844        99
IR     2025250    200200   22.1700  144.7600      10.8       106       874        96
IR     2025250    200200   22.1800  144.0600       7.3       108       933        87
IR     2025250    200200   22.2000  150.7500      10.2       120       977        83
IR     2025250    200200   22.1200  150.6600       7.9        82       949        83
IR     2025250    200200   22.1800  150.5200       7.1        73       921        88
IR     2025250    200200   22.2000  150.4600       6.9        70       900        89
IR     2025250    200200   22.1000  147.6700       8.6       119       878        67
IR     2025250    200200   22.1200  147.6500       8.5       118       880        64
IR     2025250    200200   22.1000  146.6400      10.2        98       910        90
IR     2025250    200200   22.1200  146.5400       9.4        98       918        95
IR     2025250    200200   22.0800  146.1600      11.2       110       969        81
IR     2025250    200200   22.1400  145.9800      11.2       105       959        90
IR     2025250    200200   22.1400  145.9600      11.2       105       958        90
IR     2025250    200200   22.0500  145.7900      12.1       122       578        80
IR     2025250    200200   22.1100  145.5800      10.2       121       763        88
IR     2025250    200200   22.0500  145.3900       9.0       130       649        86
IR     2025250    200200   22.0700  145.3500       8.0       133       686        66
IR     2025250    200200   22.0500  145.1500       9.8       126       835        67
IR     2025250    200200   22.1100  145.0800      10.9       115       903        67
IR     2025250    200200   22.1300  144.9600      11.0       115       841        97
IR     2025250    200200   22.1300  144.8400      10.3       117       698        95
IR     2025250    200200   22.1200  144.6000      10.6       117       575        62
IR     2025250    200200   22.0600  144.4900       9.0       134       575        69
IR     2025250    200200   22.1000  144.4600       7.7       139       577        66
IR     2025250    200200   22.0400  143.9700       4.9       129       922        62
IR     2025250    200200   22.0200  150.7300       8.2        81       962        92
IR     2025250    200200   22.0200  150.6400       8.3        69       944        79
IR     2025250    200200   22.0100  150.5600       8.0        62       942        84
IR     2025250    200200   22.0200  149.5200       9.7       104       945        92
IR     2025250    200200   22.0800  149.3600       9.6       116       921        85
IR     2025250    200200   22.0000  149.3100       8.9       112       906        92
IR     2025250    200200   21.9700  147.5000      11.9       122       846        87
IR     2025250    200200   21.9600  146.7700      10.0       110       912        64
IR     2025250    200200   21.9600  146.6300      10.1       111       887        88
IR     2025250    200200   22.0200  146.6000      10.2       104       906        87
IR     2025250    200200   22.0200  146.3900       9.3       101       940        74
IR     2025250    200200   22.0200  146.2500      10.3       107       961        81
IR     2025250    200200   21.9800  146.1500      11.5       119       969        83
IR     2025250    200200   21.9500  146.0100      12.1       129       629        81
IR     2025250    200200   21.9700  145.9100      12.4       122       619        85
IR     2025250    200200   21.9700  145.6900      10.9       121       564        70
IR     2025250    200200   22.0100  145.5700       9.7       121       563        74
IR     2025250    200200   22.0300  145.5100      10.8       119       582        85
IR     2025250    200200   21.9500  145.3300      10.6       130       570        81
IR     2025250    200200   22.0100  145.2300       9.6       136       684        87
IR     2025250    200200   22.0300  145.1700       9.6       131       782        77
IR     2025250    200200   22.0000  144.3300       5.9       157       745        85
IR     2025250    200200   22.0000  144.2700       4.7       170       831        62
IR     2025250    200200   21.9300  150.6500       9.6        53       951        82
IR     2025250    200200   21.9500  150.6400       9.4        54       949        80
IR     2025250    200200   21.9600  149.5700      10.0       100       948        92
IR     2025250    200200   21.9400  149.4700       9.3        99       921        96
IR     2025250    200200   21.8900  149.3000       7.8       108       883        91
IR     2025250    200200   21.9700  149.2000       7.6       105       912        94
IR     2025250    200200   21.9500  147.5400      11.9       122       827        88
IR     2025250    200200   21.9000  146.9300       9.3        88       939        68
IR     2025250    200200   21.9200  146.8300       9.5       102       919        67
IR     2025250    200200   21.8600  146.5200       8.2       112       800        97
IR     2025250    200200   21.8600  146.4800       8.1       113       832        98
IR     2025250    200200   21.8800  146.3200      10.2       115       939        90
IR     2025250    200200   21.8500  146.2000      10.4       117       944        89
IR     2025250    200200   21.8500  146.1400      10.7       124       900        90
IR     2025250    200200   21.8700  146.0000      12.2       131       632        86
IR     2025250    200200   21.8900  145.9800      12.4       130       624        86
IR     2025250    200200   21.8700  145.8200      13.5       125       561        69
IR     2025250    200200   21.9100  145.7200      11.8       123       562        72
IR     2025250    200200   21.9300  145.6800      11.2       122       563        72
IR     2025250    200200   21.8900  145.5000      10.4       119       561        86
IR     2025250    200200   21.8900  145.4800      10.4       120       562        87
IR     2025250    200200   21.8500  145.3400      10.7       128       570        73
IR     2025250    200200   21.9300  145.2800      10.7       128       570        70
IR     2025250    200200   21.9200  144.2200       6.1       152       747        72
IR     2025250    200200   21.8300  144.1000       7.6       134       816        87
IR     2025250    200200   21.8500  144.0800       6.6       143       850        75
IR     2025250    200200   21.8400  149.6200      10.2        87       960        81
IR     2025250    200200   21.7900  149.5300       9.9       107       921        92
IR     2025250    200200   21.8500  149.3100       8.0       111       890        83
IR     2025250    200200   21.7700  148.0100       9.9       131       873        80
IR     2025250    200200   21.8200  146.9000       9.7        94       954        96
IR     2025250    200200   21.7600  146.8400       9.9        99       844        96
IR     2025250    200200   21.7800  146.7600       9.8       107       768        93
IR     2025250    200200   21.7600  146.5900       7.9       114       742        98
IR     2025250    200200   21.8400  146.5200       7.9       113       794        93
IR     2025250    200200   21.7500  146.3700       9.7       126       823        92
IR     2025250    200200   21.7500  146.3100      10.5       128       860        89
IR     2025250    200200   21.8300  146.1800      10.1       121       912        89
IR     2025250    200200   21.8300  146.1600      10.2       124       901        90
IR     2025250    200200   21.7500  145.8700      12.5       129       567        63
IR     2025250    200200   21.7700  145.7100      11.7       123       562        82
IR     2025250    200200   21.7500  145.6500      11.5       121       566        91
IR     2025250    200200   21.8100  145.5600      12.2       120       655        87
IR     2025250    200200   21.7700  145.4500      10.1       120       575        84
IR     2025250    200200   21.7800  145.3700       9.9       124       575        76
IR     2025250    200200   21.8100  143.7000       8.6       121       920        67
IR     2025250    200200   21.8100  143.6800       8.3       123       920        67
IR     2025250    200200   21.7300  143.4400       4.8       138       929        69
IR     2025250    200200   21.6900  149.6000       8.8        88       939        86
IR     2025250    200200   21.6900  149.5000       9.1       108       916        91
IR     2025250    200200   21.6900  149.4800       9.0       109       916        91
IR     2025250    200200   21.7500  149.3000       8.4       118       906        72
IR     2025250    200200   21.7700  149.2900       8.1       117       908        72
IR     2025250    200200   21.6700  148.0400       8.9       130       872        80
IR     2025250    200200   21.6900  147.9800      10.4       132       869        83
IR     2025250    200200   21.6700  147.8000      12.1       129       833        87
IR     2025250    200200   21.7100  147.6000       8.6       116       750        98
IR     2025250    200200   21.6800  146.9500      11.1        94       959        87
IR     2025250    200200   21.7400  146.8500       9.9        96       844        98
IR     2025250    200200   21.7400  146.8300       9.8        98       835        98
IR     2025250    200200   21.7000  146.6700       8.3       108       743        95
IR     2025250    200200   21.7400  146.5900       7.9       115       739        96
IR     2025250    200200   21.7400  146.5100       8.4       122       752        92
IR     2025250    200200   21.6700  146.3900      10.5       128       795        92
IR     2025250    200200   21.6900  146.3300      10.8       130       844        83
IR     2025250    200200   21.7100  146.2300      10.3       129       914        66
IR     2025250    200200   21.7300  146.0500      11.4       139       764        75
IR     2025250    200200   21.7300  145.9500      12.3       136       697        73
IR     2025250    200200   21.6900  145.9300      11.5       135       737        68
IR     2025250    200200   21.6500  145.7800      13.5       118       813        73
IR     2025250    200200   21.7100  145.5700      12.3       120       715        86
IR     2025250    200200   21.6400  145.5000      10.9       123       731        90
IR     2025250    200200   21.7200  145.4300      10.3       123       580        86
IR     2025250    200200   21.6400  145.3200       9.1       129       567        72
IR     2025250    200200   21.6600  144.8500       7.0       148       434        65
IR     2025250    200200   21.6600  144.8300       6.8       148       434        65
IR     2025250    200200   21.6400  144.7300       8.2       132       443        75
IR     2025250    200200   21.6400  144.6300       8.6       132       499        83
IR     2025250    200200   21.6300  144.4900      10.7       128       451        96
IR     2025250    200200   21.5900  149.6300       7.4        90       966        65
IR     2025250    200200   21.6300  149.5200       8.7       110       917        91
IR     2025250    200200   21.5900  149.4100       8.1       113       927        87
IR     2025250    200200   21.6100  149.3900       8.2       115       923        84
IR     2025250    200200   21.5700  148.1700       7.4       127       917        87
IR     2025250    200200   21.6500  148.0600       8.3       130       874        79
IR     2025250    200200   21.5700  147.9300      10.6       132       822        77
IR     2025250    200200   21.6500  147.8100      12.2       130       834        86
IR     2025250    200200   21.5600  146.9400       9.8        91       925        94
IR     2025250    200200   21.5600  146.9200       9.7        91       890        97
IR     2025250    200200   21.5800  146.8000       8.2        95       836        96
IR     2025250    200200   21.5500  146.6400       7.9       116       726        97
IR     2025250    200200   21.5700  146.6200       8.0       118       723        98
IR     2025250    200200   21.5900  146.4400      10.6       129       755        90
IR     2025250    200200   21.6300  146.4000      10.7       128       788        93
IR     2025250    200200   21.6300  146.3000      11.5       128       914        80
IR     2025250    200200   21.5500  146.1800      10.5       126       915        82
IR     2025250    200200   21.6300  146.0400       9.3       138       878        61
IR     2025250    200200   21.6100  145.9400      10.1       137       849        66
IR     2025250    200200   21.5900  145.8600      11.9       121       873        71
IR     2025250    200200   21.6300  145.8000      12.9       116       838        69
IR     2025250    200200   21.6300  145.7200      14.0       113       867        68
IR     2025250    200200   21.6200  145.5800      12.6       117       796        85
IR     2025250    200200   21.6200  145.5000      11.0       122       741        92
IR     2025250    200200   21.6000  145.3800       9.9       128       715        93
IR     2025250    200200   21.5400  145.2400       9.9       120       543        92
IR     2025250    200200   21.5400  145.1000       8.9       120       423        96
IR     2025250    200200   21.5400  145.0200       8.3       126       384        98
IR     2025250    200200   21.5400  144.8400       7.6       138       387        89
IR     2025250    200200   21.5600  144.7600       8.0       129       395        87
IR     2025250    200200   21.5500  144.6400       8.8       128       421        70
IR     2025250    200200   21.5700  144.5800       9.0       128       452        68
IR     2025250    200200   21.5900  144.5200      10.4       129       451        79
IR     2025250    200200   21.6100  144.4300      10.9       129       485        95
IR     2025250    200200   21.5100  149.5200       7.9        99       913        91
IR     2025250    200200   21.5700  149.4900       8.2       108       922        92
IR     2025250    200200   21.4900  149.4000       7.7       109       920        91
IR     2025250    200200   21.5300  148.1700       7.5       129       919        84
IR     2025250    200200   21.5500  147.8400       9.6       124       787        84
IR     2025250    200200   21.5500  147.8200       9.7       123       793        87
IR     2025250    200200   21.5500  147.6400       6.7       110       765        81
IR     2025250    200200   21.4600  147.6000       6.7       114       745        75
IR     2025250    200200   21.5000  147.2600       7.7       112       967        64
IR     2025250    200200   21.5200  147.2200       7.4       115       960        63
IR     2025250    200200   21.4600  147.0500       8.5       104       846        98
IR     2025250    200200   21.4800  147.0100       8.3       106       835        99
IR     2025250    200200   21.4500  146.8500       8.2       103       841        99
IR     2025250    200200   21.5300  146.6400       7.9       116       730        96
IR     2025250    200200   21.4500  146.4700      11.0       127       866        72
IR     2025250    200200   21.5300  146.4400      11.2       128       796        87
IR     2025250    200200   21.4900  146.3300      12.3       125       918        68
IR     2025250    200200   21.4500  145.9900      10.4       121       907        82
IR     2025250    200200   21.4900  145.9100      10.9       118       892        75
IR     2025250    200200   21.4600  145.8100      13.5       106       888        87
IR     2025250    200200   21.5200  145.7500      14.1       109       887        77
IR     2025250    200200   21.5200  145.6200      13.6       111       885        81
IR     2025250    200200   21.4400  145.5100      12.8       119       857        87
IR     2025250    200200   21.4400  145.4300      13.7       118       546        74
IR     2025250    200200   21.5200  145.2800       9.9       123       543        91
IR     2025250    200200   21.5200  145.2600       9.8       123       538        92
IR     2025250    200200   21.5200  145.1400       9.2       118       435        96
IR     2025250    200200   21.5200  145.0000       8.5       124       379        96
IR     2025250    200200   21.5200  144.9400       8.5       129       383        94
IR     2025250    200200   21.5100  144.6600       9.5       122       410        93
IR     2025250    200200   21.4900  144.5800      10.2       109       864        85
IR     2025250    200200   21.4300  144.4500       9.5       111       872        95
IR     2025250    200200   21.4500  144.3000      13.6       113       573        81
IR     2025250    200200   21.4500  143.9600       6.8       145       847        77
IR     2025250    200200   21.5000  143.0300       8.5       107       944        89
IR     2025250    200200   21.3900  149.5900       7.9        88       934        95
IR     2025250    200200   21.4300  149.4900       7.9        99       927        95
IR     2025250    200200   21.3600  147.7300       6.6       108       765        83
IR     2025250    200200   21.4400  147.6700       5.8       107       746        71
IR     2025250    200200   21.4000  147.4700       6.8       109       768        73
IR     2025250    200200   21.4000  147.3900       7.3       103       892        62
IR     2025250    200200   21.4400  147.0700       8.7       106       890        93
IR     2025250    200200   21.3500  146.7600       8.7       115       832        72
IR     2025250    200200   21.3500  146.7400       8.7       116       835        69
IR     2025250    200200   21.3700  146.6000       8.3       118       840        61
IR     2025250    200200   21.4300  146.4900      10.9       126       864        69
IR     2025250    200200   21.4300  146.4300      11.6       124       883        66
IR     2025250    200200   21.4100  146.3500      12.7       120       902        75
IR     2025250    200200   21.4300  146.0100      11.1       118       912        90
IR     2025250    200200   21.4200  145.8900      13.6       106       897        93
IR     2025250    200200   21.3600  145.8600      15.7       101       895        77
IR     2025250    200200   21.3400  145.6800      17.5       106       563        78
IR     2025250    200200   21.4000  145.5900      14.0       111       884        83
IR     2025250    200200   21.4200  145.5300      13.4       118       865        87
IR     2025250    200200   21.4200  145.4500      14.4       118       546        79
IR     2025250    200200   21.4000  145.3100      10.8       126       423        92
IR     2025250    200200   21.3400  145.1800       9.0       113       390        88
IR     2025250    200200   21.3600  145.0900       8.6       110       389        91
IR     2025250    200200   21.3300  144.9800      10.0       111       401        91
IR     2025250    200200   21.3500  144.9700      10.0       114       406        91
IR     2025250    200200   21.3900  144.5100      10.0       108       868        93
IR     2025250    200200   21.3500  144.3900      12.1       121       561        95
IR     2025250    200200   21.3300  144.3100      12.2       116       569        87
IR     2025250    200200   21.3300  144.1500      12.2       118       566        79
IR     2025250    200200   21.3300  144.0700       7.4       140       827        89
IR     2025250    200200   21.3900  143.9400       6.7       139       846        85
IR     2025250    200200   21.4100  143.8800       7.7       133       853        89
IR     2025250    200200   21.3200  143.7300       9.5       119       824        89
IR     2025250    200200   21.3700  149.6300       7.9        80       948        93
IR     2025250    200200   21.3100  149.5600       8.5        84       934        98
IR     2025250    200200   21.3400  149.4200       8.0       111       920        85
IR     2025250    200200   21.3400  149.4000       7.9       113       910        79
IR     2025250    200200   21.2700  148.1200       7.8       136       904        64
IR     2025250    200200   21.2700  148.1000       7.5       135       888        63
IR     2025250    200200   21.2800  147.9600       7.1       120       837        71
IR     2025250    200200   21.2800  147.9000       7.6       120       810        79
IR     2025250    200200   21.3400  147.6000       7.3       119       720        94
IR     2025250    200200   21.3400  147.4800       7.3       111       756        91
IR     2025250    200200   21.3200  147.1200       9.6       116       935        88
IR     2025250    200200   21.2500  146.9500       9.7       123       852        92
IR     2025250    200200   21.2500  146.9300       9.7       121       848        87
IR     2025250    200200   21.2500  146.8300       9.4       117       859        68
IR     2025250    200200   21.3100  146.4600      11.9       114       886        66
IR     2025250    200200   21.3300  146.3600      12.4       111       891        79
IR     2025250    200200   21.2500  146.3300      13.1       106       886        94
IR     2025250    200200   21.2800  146.1600      13.8       104       897        86
IR     2025250    200200   21.2600  146.1000      13.5       111       909        78
IR     2025250    200200   21.2400  145.9900      14.0       108       910        78
IR     2025250    200200   21.2400  145.8500      16.7        95       888        77
IR     2025250    200200   21.2800  145.7000      17.8       105       556        65
IR     2025250    200200   21.2800  145.6400      17.3       111       546        68
IR     2025250    200200   21.2600  145.5400      16.1       117       480        80
IR     2025250    200200   21.2400  145.3600      12.5       121       390        92
IR     2025250    200200   21.2600  145.3400      11.9       123       390        95
IR     2025250    200200   21.2300  145.1600       8.9       115       387        96
IR     2025250    200200   21.2500  145.1200       9.3       113       388        94
IR     2025250    200200   21.3100  145.0400       9.9       109       391        91
IR     2025250    200200   21.2500  144.8600      13.4       120       503        92
IR     2025250    200200   21.2300  144.8200      14.6       117       501        93
IR     2025250    200200   21.2700  144.3400      11.6       115       562        93
IR     2025250    200200   21.2300  144.1600      12.9       115       577        80
IR     2025250    200200   21.3100  144.0500       7.6       134       826        86
IR     2025250    200200   21.2600  143.9100       7.4       123       827        93
IR     2025250    200200   21.2600  143.8700       7.9       118       824        96
IR     2025250    200200   21.2600  143.7300       8.7       120       796        95
IR     2025250    200200   21.2400  143.6500       6.3       131       781        86
IR     2025250    200200   21.2600  142.8400       9.7       106       954        81
IR     2025250    200200   21.2400  151.8300       4.2        75       952        73
IR     2025250    200200   21.2200  147.9200       7.9       123       852        68
IR     2025250    200200   21.1600  147.5700       8.9       118       729        96
IR     2025250    200200   21.1800  147.5500       9.1       120       734        93
IR     2025250    200200   21.2000  147.4100      10.2       123       908        84
IR     2025250    200200   21.2100  146.9700       9.7       125       872        84
IR     2025250    200200   21.1700  146.8900       9.8       125       877        60
IR     2025250    200200   21.1400  146.3500      12.4       106       886        95
IR     2025250    200200   21.1400  146.2100      12.5       105       888        79
IR     2025250    200200   21.1400  146.1100      14.3       105       883        72
IR     2025250    200200   21.1600  146.0500      14.3       113       881        63
IR     2025250    200200   21.2000  145.6100      15.6       115       484        91
IR     2025250    200200   21.2000  145.5900      15.5       115       430        87
IR     2025250    200200   21.1500  145.0300       9.0       119       410        92
IR     2025250    200200   21.1300  144.9700      11.0       120       424        96
IR     2025250    200200   21.2100  144.8400      14.8       119       483        93
IR     2025250    200200   21.1300  144.7300      16.5       115       462        91
IR     2025250    200200   21.1300  144.7100      16.6       114       476        92
IR     2025250    200200   21.2100  144.1400       7.7       137       816        68
IR     2025250    200200   21.1200  143.9600       7.4       129       798        64
IR     2025250    200200   21.2000  143.8900       7.7       118       817        91
IR     2025250    200200   21.1100  151.6300       4.3       128       967        64
IR     2025250    200200   21.1500  151.4500       4.1       111       962        83
IR     2025250    200200   21.1100  151.4200       4.2       110       956        73
IR     2025250    200200   21.1400  148.0700       8.6       136       877        62
IR     2025250    200200   21.1000  147.5200       9.0       114       751        97
IR     2025250    200200   21.1200  147.4900       9.5       120       774        91
IR     2025250    200200   21.0600  147.3800       9.4       113       916        88
IR     2025250    200200   21.1100  147.0600       8.5       117       870        81
IR     2025250    200200   21.1300  147.0300       8.6       120       871        81
IR     2025250    200200   21.0900  146.6600      10.2       111       890        68
IR     2025250    200200   21.0700  146.5400      11.0       118       884        82
IR     2025250    200200   21.0400  146.4400      10.6       115       881        74
IR     2025250    200200   21.0600  146.4200      11.1       114       882        69
IR     2025250    200200   21.0400  146.3200      11.8       109       884        85
IR     2025250    200200   21.0600  146.1400      13.2       110       869        89
IR     2025250    200200   21.0400  146.1000      13.5       113       826        78
IR     2025250    200200   21.0400  145.9800      15.9       117       570        80
IR     2025250    200200   21.1200  145.9300      17.0       106       570        81
IR     2025250    200200   21.0400  145.5800      11.2       119       367        88
IR     2025250    200200   21.0300  145.4600      13.3       115       348        83
IR     2025250    200200   21.0500  145.3600      13.4       117       370        87
IR     2025250    200200   21.0700  145.1500       9.9       122       407        99
IR     2025250    200200   21.1100  144.9900      10.6       120       427        96
IR     2025250    200200   21.0500  144.9700      11.6       119       422        96
IR     2025250    200200   21.0300  144.8300      14.2       124       418        93
IR     2025250    200200   21.0900  144.6900      16.3       115       505        94
IR     2025250    200200   21.0900  144.6700      16.5       114       511        93
IR     2025250    200200   21.1100  144.5700      15.8       112       549        89
IR     2025250    200200   21.1100  144.4100      12.0       119       563        97
IR     2025250    200200   21.0200  144.2900       9.3       131       561        92
IR     2025250    200200   21.0600  143.5200       5.7       155       406        79
IR     2025250    200200   21.0900  151.6300       4.2       124       967        64
IR     2025250    200200   21.0000  148.1400      11.2       137       882        61
IR     2025250    200200   21.0200  148.0600      10.8       137       868        66
IR     2025250    200200   21.0400  147.5400       8.6        99       751        97
IR     2025250    200200   20.9500  147.4100       8.6       101       830        86
IR     2025250    200200   20.9500  147.3900       8.8       105       842        87
IR     2025250    200200   20.9900  147.0300       7.6       117       858        69
IR     2025250    200200   21.0100  147.0200       7.9       119       868        63
IR     2025250    200200   20.9500  146.6700      10.6       103       892        71
IR     2025250    200200   20.9400  146.5500      10.7       114       892        88
IR     2025250    200200   21.0200  146.4600      10.1       117       881        78
IR     2025250    200200   21.0200  146.3600      11.2       116       884        71
IR     2025250    200200   21.0200  146.3400      11.5       112       886        72
IR     2025250    200200   21.0200  146.1400      12.9       115       866        66
IR     2025250    200200   21.0000  145.6400      11.1       129       334        83
IR     2025250    200200   20.9900  145.5200      11.6       119       329        84
IR     2025250    200200   21.0100  145.4800      12.8       116       334        83
IR     2025250    200200   20.9500  145.3000      13.3       125       315        83
IR     2025250    200200   20.9300  145.0400      10.2       134       378        95
IR     2025250    200200   20.9300  144.9200      12.2       132       394        97
IR     2025250    200200   20.9300  144.8600      13.9       131       388        91
IR     2025250    200200   20.9300  144.8000      14.9       134       388        89
IR     2025250    200200   21.0100  144.6900      16.6       120       449        90
IR     2025250    200200   20.9700  144.5200      14.9       126       436        91
IR     2025250    200200   20.9200  144.4200      11.8       141       401        86
IR     2025250    200200   20.9200  144.3800      11.4       142       401        84
IR     2025250    200200   20.9600  144.2900       9.1       142       542        82
IR     2025250    200200   20.9400  144.1500       9.4       136       507        83
IR     2025250    200200   20.9200  143.4800       7.1       150       474        82
IR     2025250    200200   20.8800  148.2300       9.1       126       882        85
IR     2025250    200200   20.9000  148.1500      10.8       135       864        82
IR     2025250    200200   20.9400  147.6300       9.5        72       756        68
IR     2025250    200200   20.9300  147.4100       8.4        99       819        85
IR     2025250    200200   20.9300  147.2900       9.5       120       826        91
IR     2025250    200200   20.8500  147.1600       7.8       116       795        83
IR     2025250    200200   20.8900  147.1100       7.4       119       814        79
IR     2025250    200200   20.8400  146.6000      11.9       112       899        90
IR     2025250    200200   20.9200  146.4900      12.0       117       898        71
IR     2025250    200200   20.9200  146.4500      12.2       120       903        64
IR     2025250    200200   20.8800  146.2900      12.9       109       912        60
IR     2025250    200200   20.9000  146.1900      12.7       110       896        63
IR     2025250    200200   20.8400  146.0600      14.1       153       320        76
IR     2025250    200200   20.8300  145.6100      13.2       142       266        91
IR     2025250    200200   20.8300  145.5700      13.2       140       269        91
IR     2025250    200200   20.8300  145.4900      13.7       139       274        89
IR     2025250    200200   20.8900  145.3700      13.8       125       281        83
IR     2025250    200200   20.8700  145.2300      13.7       135       309        85
IR     2025250    200200   20.8700  145.1700      12.8       137       315        86
IR     2025250    200200   20.8300  145.0900      13.1       135       312        79
IR     2025250    200200   20.9100  144.9400      12.1       131       390        96
IR     2025250    200200   20.9100  144.9000      13.1       131       391        94
IR     2025250    200200   20.8900  144.7400      15.8       135       390        89
IR     2025250    200200   20.8300  144.6500      17.0       134       287        83
IR     2025250    200200   20.8200  144.5400      15.3       140       273        87
IR     2025250    200200   20.8200  144.4400      12.0       151       283        94
IR     2025250    200200   20.9000  144.4000      11.5       144       361        84
IR     2025250    200200   20.8200  144.2600       9.8       151       286        95
IR     2025250    200200   20.8200  144.1600       9.9       149       288        98
IR     2025250    200200   20.8200  144.1000       8.9       161       295        94
IR     2025250    200200   20.8400  143.5700       8.1       141       395        73
IR     2025250    200200   20.8300  142.7200       6.8       125       762        69
IR     2025250    200200   20.8100  151.8600       4.9        46       968        90
IR     2025250    200200   20.8100  151.8200       4.8        50       976        90
IR     2025250    200200   20.8300  151.7200       4.4        61       972        72
IR     2025250    200200   20.7600  148.2600       5.8       101       871        92
IR     2025250    200200   20.7500  147.4500       7.7        85       729        85
IR     2025250    200200   20.8300  147.4000       7.6        90       748        82
IR     2025250    200200   20.8300  147.3200       8.0       108       752        87
IR     2025250    200200   20.8200  146.6400      11.4       109       898        80
IR     2025250    200200   20.7600  146.5400      13.0       110       926        82
IR     2025250    200200   20.8200  146.4400      13.2       118       927        66
IR     2025250    200200   20.7400  146.3800      14.2       112       934        73
IR     2025250    200200   20.7400  146.2000      15.6       152       337        79
IR     2025250    200200   20.7400  146.1200      14.9       156       260        89
IR     2025250    200200   20.7600  146.0800      14.1       155       263        82
IR     2025250    200200   20.8200  145.9200      12.9       152       277        77
IR     2025250    200200   20.8000  145.8800      12.4       152       272        76
IR     2025250    200200   20.8200  145.7400      13.3       144       261        92
IR     2025250    200200   20.7900  145.5800      14.5       142       290        85
IR     2025250    200200   20.7900  145.4900      14.8       141       289        85
IR     2025250    200200   20.7500  145.3600      15.2       131       267        83
IR     2025250    200200   20.7700  145.2300      15.6       133       267        84
IR     2025250    200200   20.8100  145.1100      13.7       136       305        83
IR     2025250    200200   20.7300  145.0100      15.1       144       251        93
IR     2025250    200200   20.7500  144.9100      14.6       141       255        92
IR     2025250    200200   20.7700  144.8500      15.6       135       256        86
IR     2025250    200200   20.7900  144.7900      15.6       134       261        86
IR     2025250    200200   20.8100  144.6900      16.5       134       263        85
IR     2025250    200200   20.8000  144.5700      16.1       138       263        86
IR     2025250    200200   20.7600  144.4500      12.3       159       258        98
IR     2025250    200200   20.8000  144.3200      10.7       155       268        93
IR     2025250    200200   20.8000  144.2800      10.3       152       267        92
IR     2025250    200200   20.8000  144.2000      10.1       152       273        98
IR     2025250    200200   20.7200  143.9000       8.5       185       298        71
IR     2025250    200200   20.7600  143.7400       6.5       166       342        73
IR     2025250    200200   20.7400  143.7000       6.1       175       350        66
IR     2025250    200200   20.7400  143.6200       6.2       171       389        85
IR     2025250    200200   20.7200  143.4500       8.5       155       493        87
IR     2025250    200200   20.7400  143.4300       8.8       152       518        84
IR     2025250    200200   20.7500  143.2500       6.3       162       547        82
IR     2025250    200200   20.7700  143.2300       5.6       164       558        77
IR     2025250    200200   20.7100  143.0500       5.2       159       567        62
IR     2025250    200200   20.7100  143.0300       5.2       154       585        62
IR     2025250    200200   20.7500  151.8500       4.9        47       968        90
IR     2025250    200200   20.7500  151.8100       4.9        51       976        92
IR     2025250    200200   20.7200  148.2300       6.2       113       868        84
IR     2025250    200200   20.7000  148.0900       9.0       136       815        85
IR     2025250    200200   20.7100  147.4500       7.5        88       728        95
IR     2025250    200200   20.7000  146.4300      13.9       115       942        84
IR     2025250    200200   20.7200  146.4100      14.2       114       939        78
IR     2025250    200200   20.6400  146.2300      15.3       150       257        93
IR     2025250    200200   20.6600  146.2100      15.5       152       257        92
IR     2025250    200200   20.7200  146.0600      13.5       159       253        86
IR     2025250    200200   20.7200  146.0200      12.7       161       257        85
IR     2025250    200200   20.6800  145.9100      11.4       158       253        95
IR     2025250    200200   20.6300  145.7900      12.5       139       270        82
IR     2025250    200200   20.6500  145.6700      16.0       139       303        77
IR     2025250    200200   20.6500  145.5900      16.3       135       306        80
IR     2025250    200200   20.6300  145.4700      16.4       134       274        87
IR     2025250    200200   20.6700  145.2000      16.0       138       243        89
IR     2025250    200200   20.6900  145.1400      15.3       140       245        91
IR     2025250    200200   20.7100  145.0000      15.4       144       244        91
IR     2025250    200200   20.6500  144.9000      15.4       137       238        87
IR     2025250    200200   20.6700  144.7600      14.6       139       239        90
IR     2025250    200200   20.6400  144.6600      14.1       143       241        92
IR     2025250    200200   20.6400  144.5800      13.2       151       245        97
IR     2025250    200200   20.6200  144.5200      12.6       156       250        99
IR     2025250    200200   20.6800  144.4300      11.3       168       247        97
IR     2025250    200200   20.6200  144.2700      10.7       162       258        98
IR     2025250    200200   20.6400  144.2100       9.9       174       256        97
IR     2025250    200200   20.6200  144.1500       9.5       193       265        88
IR     2025250    200200   20.7000  143.9800       9.3       196       280        80
IR     2025250    200200   20.6800  143.8800       8.3       179       298        73
IR     2025250    200200   20.6600  143.8400       8.4       167       301        75
IR     2025250    200200   20.6200  143.7500       7.9       160       301        78
IR     2025250    200200   20.7000  143.5800       6.9       174       388        85
IR     2025250    200200   20.7000  143.5200       7.4       167       407        84
IR     2025250    200200   20.6700  143.4200       8.4       155       491        86
IR     2025250    200200   20.6100  143.2800       7.1       157       367        80
IR     2025250    200200   20.6700  143.1900       6.7       158       382        87
IR     2025250    200200   20.6900  143.1500       6.0       163       391        83
IR     2025250    200200   20.6300  143.0100       5.3       149       437        82
IR     2025250    200200   20.6300  142.9700       4.7       147       578        65
IR     2025250    200200   20.6000  148.1000       8.1       135       828        85
IR     2025250    200200   20.5600  147.8600       6.5        82       719        82
IR     2025250    200200   20.5500  147.3800      10.2       123       752        91
IR     2025250    200200   20.5700  147.3200       9.9       121       752        93
IR     2025250    200200   20.5400  146.3200      14.3       142       263        82
IR     2025250    200200   20.5400  146.2800      14.5       143       235        84
IR     2025250    200200   20.5400  146.0000      10.9       143       250        95
IR     2025250    200200   20.5400  145.9200      10.0       139       261        96
IR     2025250    200200   20.5300  145.7600      13.1       134       280        82
IR     2025250    200200   20.5900  145.6500      16.1       134       293        80
IR     2025250    200200   20.5300  145.5500      16.6       136       270        87
IR     2025250    200200   20.5700  145.4500      15.8       135       253        93
IR     2025250    200200   20.5300  145.4100      15.7       136       248        93
IR     2025250    200200   20.6100  145.2900      16.6       135       244        89
IR     2025250    200200   20.6100  145.2000      15.3       141       241        90
IR     2025250    200200   20.6100  145.0800      14.6       144       239        91
IR     2025250    200200   20.5700  144.9800      14.7       138       238        88
IR     2025250    200200   20.5900  144.9400      14.8       136       238        88
IR     2025250    200200   20.5200  144.7600      14.9       125       254        88
IR     2025250    200200   20.5200  144.6600      13.0       136       261        93
IR     2025250    200200   20.5400  144.6000      12.2       149       256        99
IR     2025250    200200   20.5400  144.4600      11.4       159       259        98
IR     2025250    200200   20.5400  144.3600      10.9       165       259        96
IR     2025250    200200   20.5600  144.2600      10.9       164       265        96
IR     2025250    200200   20.6000  144.1900       9.6       187       267        89
IR     2025250    200200   20.5600  144.1100      10.1       205       273        85
IR     2025250    200200   20.5400  144.0500       9.8       206       274        84
IR     2025250    200200   20.5800  143.8900       8.5       174       277        92
IR     2025250    200200   20.6000  143.8500       8.9       162       283        90
IR     2025250    200200   20.5900  143.1400       6.5       155       376        69
IR     2025250    200200   20.5900  143.0500       5.7       152       405        73
IR     2025250    200200   20.5900  143.0100       5.2       149       429        82
IR     2025250    200200   20.4800  148.2700       9.4       146       878        79
IR     2025250    200200   20.5200  148.2600       8.4       144       872        78
IR     2025250    200200   20.5200  148.0800       6.1       103       827        92
IR     2025250    200200   20.4800  148.0100       6.4        77       801        88
IR     2025250    200200   20.4600  147.9300       7.1        68       750        81
IR     2025250    200200   20.5300  147.6000       7.3        92       738        95
IR     2025250    200200   20.5300  147.5600       7.7       103       737        97
IR     2025250    200200   20.4500  147.4100      11.1       125       795        89
IR     2025250    200200   20.4900  147.3700      11.0       126       783        83
IR     2025250    200200   20.4800  146.5000      11.1        99       939        75
IR     2025250    200200   20.4400  146.3700      14.7       134       304        75
IR     2025250    200200   20.5200  146.3000      14.3       141       237        83
IR     2025250    200200   20.4800  146.0400      11.7       140       262        98
IR     2025250    200200   20.4800  145.9800      10.8       138       272        97
IR     2025250    200200   20.4500  145.8400      11.0       137       282        91
IR     2025250    200200   20.4300  145.7400      14.2       137       276        86
IR     2025250    200200   20.4300  145.6800      15.6       136       271        87
IR     2025250    200200   20.5100  145.5700      16.5       136       269        88
IR     2025250    200200   20.5100  145.4100      15.6       136       249        94
IR     2025250    200200   20.4500  145.3200      15.3       138       254        93
IR     2025250    200200   20.4900  145.2500      14.5       143       253        91
IR     2025250    200200   20.5100  145.1500      13.9       146       249        95
IR     2025250    200200   20.4300  145.0100      13.6       126       266        88
IR     2025250    200200   20.4500  144.9300      15.6       117       264        80
IR     2025250    200200   20.4800  144.8100      16.7       116       259        82
IR     2025250    200200   20.5000  144.7500      15.1       123       265        87
IR     2025250    200200   20.5000  144.6900      13.7       130       273        89
IR     2025250    200200   20.4200  144.5100      11.3       152       277        84
IR     2025250    200200   20.4400  144.4900      11.4       153       275        87
IR     2025250    200200   20.4400  144.3800      11.3       156       278        84
IR     2025250    200200   20.4600  144.3000      10.9       161       272        93
IR     2025250    200200   20.4200  144.2000      10.2       171       275        81
IR     2025250    200200   20.5000  144.0600      10.0       206       271        83
IR     2025250    200200   20.4800  144.0000       9.6       205       272        76
IR     2025250    200200   20.4400  143.9000       9.2       201       268        84
IR     2025250    200200   20.4200  143.7800       8.5       176       273        83
IR     2025250    200200   20.4400  143.6700       7.3       180       277        87
IR     2025250    200200   20.4600  143.6100       7.0       179       282        86
IR     2025250    200200   20.4100  143.1000       5.0       163       364        84
IR     2025250    200200   20.4300  142.9800       5.1       139       409        84
IR     2025250    200200   20.3800  146.4100      15.0       132       336        74
IR     2025250    200200   20.4100  145.7800      13.0       137       279        86
IR     2025250    200200   20.3700  145.7500      14.0       136       277        85
IR     2025250    200200   20.3300  145.5700      16.2       138       262        91
IR     2025250    200200   20.3700  145.5400      16.5       139       256        92
IR     2025250    200200   20.3500  145.3800      15.2       138       256        93
IR     2025250    200200   20.3500  145.3600      14.9       138       257        92
IR     2025250    200200   20.3300  145.2200      12.7       134       267        91
IR     2025250    200200   20.3300  145.0800      12.1       130       268        91
IR     2025250    200200   20.3900  145.0600      12.2       136       268        95
IR     2025250    200200   20.4100  144.9700      14.7       118       267        84
IR     2025250    200200   20.3200  144.8200      17.4       108       274        83
IR     2025250    200200   20.3400  144.7200      15.2       117       274        85
IR     2025250    200200   20.3800  144.6700      14.3       125       277        85
IR     2025250    200200   20.3800  144.5300      11.5       149       271        84
IR     2025250    200200   20.4000  144.4300      11.3       152       277        81
IR     2025250    200200   20.4000  144.2900      10.7       158       276        85
IR     2025250    200200   20.3400  144.1900      10.0       163       269        90
IR     2025250    200200   20.3200  144.1500       9.7       168       265        89
IR     2025250    200200   20.3600  144.0200      10.3       199       263        79
IR     2025250    200200   20.3200  143.9200      10.7       200       253        86
IR     2025250    200200   20.3200  143.8400      10.5       199       252        88
IR     2025250    200200   20.3400  143.7800       9.5       192       261        88
IR     2025250    200200   20.4000  143.6600       7.4       182       277        87
IR     2025250    200200   20.3300  143.5600       7.2       181       278        84
IR     2025250    200200   20.3100  143.4400       6.5       178       287        76
IR     2025250    200200   20.3700  143.2100       4.9       175       349        83
IR     2025250    200200   20.3100  143.0500       4.9       177       346        66
IR     2025250    200200   20.3100  143.0100       5.3       168       348        74
IR     2025250    200200   20.3100  142.9000       6.3       156       369        85
IR     2025250    200200   20.3300  147.4800      12.0       130       829        84
IR     2025250    200200   20.2800  146.7600       9.3        98       926        75
IR     2025250    200200   20.3000  146.7400       9.2       101       927        79
IR     2025250    200200   20.2400  146.5600      13.4       132       373        68
IR     2025250    200200   20.2400  146.5000      14.1       131       348        81
IR     2025250    200200   20.3000  146.2000      13.4       130       319        84
IR     2025250    200200   20.3200  146.1700      13.2       131       318        83
IR     2025250    200200   20.2500  145.9800      13.4       143       292        84
IR     2025250    200200   20.2300  145.8800      14.7       142       280        84
IR     2025250    200200   20.2500  145.8100      14.7       139       277        87
IR     2025250    200200   20.2300  145.7200      15.4       132       272        89
IR     2025250    200200   20.2500  145.6500      15.7       133       265        90
IR     2025250    200200   20.2700  145.4900      15.4       131       259        92
IR     2025250    200200   20.3100  145.4700      15.2       137       259        94
IR     2025250    200200   20.2300  145.3500      14.6       129       261        86
IR     2025250    200200   20.3100  145.2000      12.6       132       268        92
IR     2025250    200200   20.3100  145.1800      12.4       132       268        92
IR     2025250    200200   20.2900  145.0200      13.6       118       268        85
IR     2025250    200200   20.2800  144.9200      15.9       109       269        83
IR     2025250    200200   20.3000  144.8400      17.1       109       273        83
IR     2025250    200200   20.3000  144.7600      15.7       113       272        84
IR     2025250    200200   20.2400  144.6400      11.3       139       257        97
IR     2025250    200200   20.3000  144.5800      11.6       142       258        93
IR     2025250    200200   20.2600  144.4200       9.2       158       254        92
IR     2025250    200200   20.2400  144.3100       8.7       161       254        89
IR     2025250    200200   20.3000  144.2900       9.5       159       258        88
IR     2025250    200200   20.3000  144.1700       9.9       163       261        91
IR     2025250    200200   20.2800  144.0100      10.1       182       255        87
IR     2025250    200200   20.2800  143.9900      10.2       184       255        87
IR     2025250    200200   20.3000  143.8600      10.7       200       250        87
IR     2025250    200200   20.2600  143.7600      10.3       198       248        89
IR     2025250    200200   20.2500  143.6600       9.6       200       258        88
IR     2025250    200200   20.2500  143.5600       8.2       197       271        84
IR     2025250    200200   20.2500  143.5000       7.3       196       278        81
IR     2025250    200200   20.2100  143.3600       6.2       199       295        77
IR     2025250    200200   20.2100  143.2400       5.0       203       324        74
IR     2025250    200200   20.2900  143.0100       5.2       171       346        69
IR     2025250    200200   20.2900  142.8700       6.3       158       373        80
IR     2025250    200200   20.2300  142.8300       6.1       164       373        70
IR     2025250    200200   20.1600  148.1800       7.7       120       868        82
IR     2025250    200200   20.1900  147.7700       7.5        95       747        95
IR     2025250    200200   20.1900  147.6300      10.1       120       781        77
IR     2025250    200200   20.1500  147.6000      10.8       124       801        72
IR     2025250    200200   20.2300  147.4500      12.2       124       891        72
IR     2025250    200200   20.1600  146.7900      11.3        99       936        71
IR     2025250    200200   20.1600  146.7700      11.3        98       948        72
IR     2025250    200200   20.1400  146.6100      13.6       137       349        87
IR     2025250    200200   20.2200  146.5400      13.7       133       352        78
IR     2025250    200200   20.2200  146.4800      14.4       131       343        86
IR     2025250    200200   20.1400  146.1100      12.6       143       303        82
IR     2025250    200200   20.1700  146.0600      13.1       144       292        81
IR     2025250    200200   20.1300  145.9200      14.5       138       273        87
IR     2025250    200200   20.2100  145.7200      15.6       131       271        89
IR     2025250    200200   20.1500  145.6200      15.9       125       261        88
IR     2025250    200200   20.1700  145.4400      15.2       127       259        85
IR     2025250    200200   20.2100  145.3900      15.1       129       259        85
IR     2025250    200200   20.2100  145.3100      13.6       127       262        87
IR     2025250    200200   20.2100  145.1500      11.6       127       265        92
IR     2025250    200200   20.2100  145.1300      11.4       128       265        92
IR     2025250    200200   20.1600  144.9500      13.6       117       259        90
IR     2025250    200200   20.1600  144.9300      13.8       116       258        90
IR     2025250    200200   20.1600  144.7500      14.4       118       260        88
IR     2025250    200200   20.1200  144.7100      12.8       125       261        96
IR     2025250    200200   20.1200  144.5500       9.0       156       255        92
IR     2025250    200200   20.1200  144.4600       7.6       167       247        86
IR     2025250    200200   20.1200  144.4400       7.7       165       245        87
IR     2025250    200200   20.1400  144.2600       7.7       169       244        87
IR     2025250    200200   20.1400  144.2400       7.7       171       244        88
IR     2025250    200200   20.2000  144.0700       8.8       185       252        84
IR     2025250    200200   20.2000  144.0500       8.9       186       252        83
IR     2025250    200200   20.1600  143.9500       8.8       186       245        84
IR     2025250    200200   20.1800  143.8100      10.0       196       241        84
IR     2025250    200200   20.1100  143.7100      10.2       204       248        85
IR     2025250    200200   20.1900  143.5800       9.7       207       256        83
IR     2025250    200200   20.1300  143.5100       9.6       208       253        84
IR     2025250    200200   20.1700  143.4200       7.1       202       281        84
IR     2025250    200200   20.1100  143.3000       6.5       208       296        80
IR     2025250    200200   20.1100  143.2200       5.7       209       312        80
IR     2025250    200200   20.1300  142.7900       5.8       178       367        76
IR     2025250    200200   20.0800  147.9800       6.2       102       810        76
IR     2025250    200200   20.0500  147.8400       7.6        97       748        96
IR     2025250    200200   20.0700  147.7400       9.1       115       749        85
IR     2025250    200200   20.1200  146.9300      11.7       101       932        80
IR     2025250    200200   20.0400  146.8200      12.5       102       948        68
IR     2025250    200200   20.0600  146.6800      12.3       138       344        86
IR     2025250    200200   20.0800  146.6600      12.8       138       344        87
IR     2025250    200200   20.1000  146.5700      14.2       141       342        85
IR     2025250    200200   20.0400  146.3800      14.8       143       333        84
IR     2025250    200200   20.1000  146.1100      12.7       144       294        82
IR     2025250    200200   20.0900  146.0300      13.3       144       275        85
IR     2025250    200200   20.0900  145.9100      14.5       134       267        92
IR     2025250    200200   20.1100  145.8700      15.0       133       267        90
IR     2025250    200200   20.0700  145.7700      16.4       121       255        90
IR     2025250    200200   20.1100  145.6800      16.1       121       260        88
IR     2025250    200200   20.1100  145.5200      15.7       116       258        84
IR     2025250    200200   20.0900  145.4600      15.6       112       258        85
IR     2025250    200200   20.0900  145.3600      15.6       115       258        88
IR     2025250    200200   20.0500  145.2200      16.0       116       260        87
IR     2025250    200200   20.1100  145.1400      13.6       119       260        92
IR     2025250    200200   20.0900  145.1000      14.2       117       258        90
IR     2025250    200200   20.0800  144.9500      15.4       112       258        87
IR     2025250    200200   20.0800  144.8500      15.7       112       261        87
IR     2025250    200200   20.1000  144.7900      15.1       116       262        88
IR     2025250    200200   20.0400  144.7100      14.3       121       258        93
IR     2025250    200200   20.0800  144.5300       8.7       158       251        91
IR     2025250    200200   20.0800  144.4500       7.8       166       245        88
IR     2025250    200200   20.0800  144.4100       8.1       162       242        90
IR     2025250    200200   20.0600  144.2800       8.4       164       240        90
IR     2025250    200200   20.1000  144.1800       7.9       173       241        89
IR     2025250    200200   20.0200  144.0400       7.2       183       237        87
IR     2025250    200200   20.0200  143.9800       6.8       182       236        87
IR     2025250    200200   20.0200  143.8400       7.3       185       247        86
IR     2025250    200200   20.0100  143.6100       9.9       206       257        77
IR     2025250    200200   20.0900  143.4900       9.4       206       252        85
IR     2025250    200200   20.0900  143.4500       8.7       204       261        85
IR     2025250    200200   20.0900  143.2800       6.4       209       298        84
IR     2025250    200200   20.0700  143.2400       6.1       209       305        84
IR     2025250    200200   20.0100  143.0800       5.5       205       308        83
IR     2025250    200200   20.0100  143.0600       5.5       204       306        84
IR     2025250    200200   20.0300  142.8800       5.1       191       308        85
IR     2025250    200200   20.0300  142.8400       5.1       193       316        82
IR     2025250    200200   20.0300  142.7700       5.4       201       336        79
IR     2025250    200200   20.0100  147.7900       8.3       107       747        91
IR     2025250    200200   20.0100  147.6500       9.3       119       816        65
IR     2025250    200200   20.0100  147.5100      10.1       119       946        65
IR     2025250    200200   19.9400  146.7700      11.1       128       345        84
IR     2025250    200200   19.9600  146.7400      11.5       133       341        83
IR     2025250    200200   20.0200  146.6400      12.2       136       339        75
IR     2025250    200200   20.0200  146.1300      13.6       141       288        83
IR     2025250    200200   19.9300  145.9200      14.8       132       257        96
IR     2025250    200200   20.0100  145.8100      16.1       119       248        89
IR     2025250    200200   19.9500  145.6500      16.9       103       248        78
IR     2025250    200200   20.0100  145.5900      16.4       106       254        83
IR     2025250    200200   19.9300  145.4500      16.9       106       256        85
IR     2025250    200200   19.9500  145.3900      16.8       110       256        86
IR     2025250    200200   19.9700  145.3100      16.4       113       257        87
IR     2025250    200200   19.9900  145.1800      18.0       110       256        84
IR     2025250    200200   19.9900  145.1200      18.5       107       253        84
IR     2025250    200200   19.9200  144.9800      20.4       104       245        81
IR     2025250    200200   19.9400  144.9400      19.2       106       247        83
IR     2025250    200200   19.9200  144.7600      18.2       113       245        77
IR     2025250    200200   19.9400  144.7200      18.3       113       247        80
IR     2025250    200200   19.9400  144.6400      15.3       120       246        81
IR     2025250    200200   19.9800  144.5100      10.0       149       243        86
IR     2025250    200200   19.9400  144.3900       9.5       161       233        72
IR     2025250    200200   19.9400  144.2900      10.0       162       233        78
IR     2025250    200200   19.9400  144.2500      10.0       162       233        86
IR     2025250    200200   20.0000  144.1500       8.3       169       237        90
IR     2025250    200200   19.9500  143.6200       9.0       203       284        84
IR     2025250    200200   19.9700  143.5600       9.4       203       266        78
IR     2025250    200200   19.9300  143.5000       8.6       196       259        83
IR     2025250    200200   19.9500  143.3300       7.3       196       265        86
IR     2025250    200200   19.9300  143.2900       7.2       201       268        85
IR     2025250    200200   19.9900  143.1700       6.3       209       304        83
IR     2025250    200200   19.9900  143.0600       5.6       204       301        85
IR     2025250    200200   19.8700  147.8000       8.1       109       750        92
IR     2025250    200200   19.8500  147.6800       8.9       114       839        79
IR     2025250    200200   19.9300  147.6300       9.1       117       927        61
IR     2025250    200200   19.8400  146.8500      11.4       134       352        79
IR     2025250    200200   19.9200  146.7700      11.1       128       341        83
IR     2025250    200200   19.8400  146.4300      11.4       130       329        88
IR     2025250    200200   19.9200  146.3400      13.5       142       327        83
IR     2025250    200200   19.9100  146.0600      15.0       139       275        86
IR     2025250    200200   19.8300  145.9500      15.2       137       247        92
IR     2025250    200200   19.8300  145.9300      15.3       136       243        93
IR     2025250    200200   19.8300  145.7800      15.6       123       236        78
IR     2025250    200200   19.8700  145.7400      16.2       115       238        67
IR     2025250    200200   19.8300  145.6400      15.5       105       243        69
IR     2025250    200200   19.8900  145.5400      16.8       103       254        78
IR     2025250    200200   19.8300  145.3600      17.2       109       252        85
IR     2025250    200200   19.9100  145.2700      18.6       107       254        84
IR     2025250    200200   19.9100  145.2500      19.1       106       253        83
IR     2025250    200200   19.8900  145.0700      22.5       100       243        80
IR     2025250    200200   19.9100  144.9900      21.3       102       244        82
IR     2025250    200200   19.9000  144.9500      20.5       104       244        81
IR     2025250    200200   19.9000  144.8600      18.5       109       243        81
IR     2025250    200200   19.8600  144.6800      17.2       116       231        83
IR     2025250    200200   19.8600  144.6600      16.9       117       230        84
IR     2025250    200200   19.9000  144.5200      11.5       138       232        93
IR     2025250    200200   19.9000  144.3800      10.0       157       231        88
IR     2025250    200200   19.9000  144.3600      10.1       158       231        87
IR     2025250    200200   19.8600  144.1900       9.9       176       229        81
IR     2025250    200200   19.8600  144.1700       9.7       179       229        81
IR     2025250    200200   19.9000  143.9900       7.6       185       234        83
IR     2025250    200200   19.8600  143.9100       7.8       187       238        79
IR     2025250    200200   19.8400  143.8300       8.0       190       244        80
IR     2025250    200200   19.8200  143.7500       8.2       196       248        85
IR     2025250    200200   19.8500  143.6000       8.8       208       284        85
IR     2025250    200200   19.8100  143.5000       8.9       206       278        82
IR     2025250    200200   19.8500  143.4400       8.5       201       266        84
IR     2025250    200200   19.8100  143.3200       8.1       205       276        75
IR     2025250    200200   19.8900  143.0900       6.1       207       291        82
IR     2025250    200200   19.7800  148.0900       6.1        76       859        88
IR     2025250    200200   19.8400  148.0800       6.1        88       849        82
IR     2025250    200200   19.7500  147.7100       8.0        92       866        80
IR     2025250    200200   19.8300  147.6800       8.8       110       864        79
IR     2025250    200200   19.7500  147.5700       9.9       106       934        70
IR     2025250    200200   19.7700  147.1400      11.5        83       934        70
IR     2025250    200200   19.8200  146.8600      11.9       136       361        79
IR     2025250    200200   19.8200  146.8400      11.4       135       349        79
IR     2025250    200200   19.7800  146.7000      11.3       131       333        72
IR     2025250    200200   19.7800  146.6400      11.0       128       334        78
IR     2025250    200200   19.7800  146.4800      10.5       128       331        89
IR     2025250    200200   19.7800  146.4100      10.6       128       320        84
IR     2025250    200200   19.7600  146.3200      12.1       132       292        83
IR     2025250    200200   19.7400  146.2000      14.5       138       264        84
IR     2025250    200200   19.7400  146.1100      14.5       137       259        82
IR     2025250    200200   19.7700  145.9700      14.9       138       240        88
IR     2025250    200200   19.8100  145.9500      15.2       137       243        89
IR     2025250    200200   19.8100  145.8000      15.4       126       235        83
IR     2025250    200200   19.7300  145.6900      14.6       125       230        88
IR     2025250    200200   19.7700  145.6400      14.7       114       238        76
IR     2025250    200200   19.7700  145.4800      15.8       107       249        79
IR     2025250    200200   19.7900  145.4200      16.4       109       250        85
IR     2025250    200200   19.8100  145.3600      16.8       111       250        86
IR     2025250    200200   19.8100  145.1800      19.3       109       243        76
IR     2025250    200200   19.8100  145.1600      19.6       107       242        75
IR     2025250    200200   19.8100  145.0300      19.1       104       236        76
IR     2025250    200200   19.8000  144.8900      16.6       112       233        79
IR     2025250    200200   19.7400  144.8500      16.4       116       231        95
IR     2025250    200200   19.7200  144.7100      17.8       114       227        85
IR     2025250    200200   19.7200  144.6300      18.6       113       226        85
IR     2025250    200200   19.7200  144.5100      15.2       131       229        85
IR     2025250    200200   19.7200  144.4700      14.0       136       230        87
IR     2025250    200200   19.7200  144.3000      11.7       166       231        66
IR     2025250    200200   19.7600  144.2200      10.1       170       230        86
IR     2025250    200200   19.7600  144.1800      10.1       174       230        86
IR     2025250    200200   19.7200  144.0600       9.8       179       229        84
IR     2025250    200200   19.7400  143.9400       9.3       182       233        75
IR     2025250    200200   19.7400  143.8500       8.6       187       237        80
IR     2025250    200200   19.8000  143.7500       8.2       196       246        85
IR     2025250    200200   19.7200  143.6700       7.8       206       243        81
IR     2025250    200200   19.7100  143.5100       8.4       207       256        85
IR     2025250    200200   19.7900  143.4200       8.6       206       271        72
IR     2025250    200200   19.7900  143.3800       8.4       204       271        72
IR     2025250    200200   19.7900  143.2800       8.1       210       291        71
IR     2025250    200200   19.7900  142.8500       5.9       199       273        79
IR     2025250    200200   19.7700  142.7000       4.8       180       289        80
IR     2025250    200200   19.7100  142.6300       4.5       166       303        71
IR     2025250    200200   19.7400  148.0900       6.3        70       861        90
IR     2025250    200200   19.6500  147.8400       6.8        91       817        91
IR     2025250    200200   19.7100  147.7300       8.0        91       855        77
IR     2025250    200200   19.6500  147.6800       8.9        80       911        89
IR     2025250    200200   19.6500  147.1900      10.0        88       940        68
IR     2025250    200200   19.6600  146.8500      10.9       137       330        74
IR     2025250    200200   19.6800  146.8300      10.8       136       329        75
IR     2025250    200200   19.6800  146.7300      11.5       135       329        70
IR     2025250    200200   19.7200  146.6400      11.7       130       331        79
IR     2025250    200200   19.6800  146.4600      11.6       134       318        84
IR     2025250    200200   19.6600  146.3600      11.3       133       281        86
IR     2025250    200200   19.7200  146.1200      14.0       136       257        84
IR     2025250    200200   19.7100  146.0300      13.9       137       243        83
IR     2025250    200200   19.7100  145.9500      14.7       135       226        85
IR     2025250    200200   19.7100  145.8700      15.1       134       225        86
IR     2025250    200200   19.7100  145.6900      14.8       127       228        89
IR     2025250    200200   19.6700  145.6500      14.8       125       229        93
IR     2025250    200200   19.6300  145.4900      15.0       107       231        93
IR     2025250    200200   19.6900  145.4300      15.9       107       238        92
IR     2025250    200200   19.6500  145.3300      16.8       109       231        91
IR     2025250    200200   19.6900  145.2800      17.9       110       232        94
IR     2025250    200200   19.6900  145.1600      19.9       111       232        86
IR     2025250    200200   19.6900  145.0000      19.6       110       234        86
IR     2025250    200200   19.6400  144.9200      18.2       114       233        93
IR     2025250    200200   19.6600  144.8400      17.9       113       232        94
IR     2025250    200200   19.6800  144.7400      16.8       115       229        88
IR     2025250    200200   19.6800  144.6700      17.3       113       229        87
IR     2025250    200200   19.7000  144.5300      15.7       128       229        89
IR     2025250    200200   19.6200  144.4300      16.5       133       236        92
IR     2025250    200200   19.7000  144.3700      13.3       151       231        79
IR     2025250    200200   19.6600  144.2100      11.7       157       231        74
IR     2025250    200200   19.7000  144.1200      10.7       179       227        75
IR     2025250    200200   19.7000  144.0200       9.9       182       229        84
IR     2025250    200200   19.6600  143.9200       9.9       186       229        82
IR     2025250    200200   19.6200  143.8400       9.0       187       231        80
IR     2025250    200200   19.6200  143.6300       7.5       201       240        84
IR     2025250    200200   19.6300  143.3500       8.6       210       312        61
IR     2025250    200200   19.6100  142.9800       6.4       205       297        69
IR     2025250    200200   19.6700  142.6700       4.2       177       293        70
IR     2025250    200200   19.6300  142.6100       4.3       171       310        64
IR     2025250    200200   19.5800  148.1000       8.0        62       891        90
IR     2025250    200200   19.6400  148.0000       6.7        72       855        83
IR     2025250    200200   19.5600  147.9300       7.2        82       881        76
IR     2025250    200200   19.6300  147.8600       6.7        93       822        83
IR     2025250    200200   19.5900  147.7400       8.3        84       896        79
IR     2025250    200200   19.6300  147.6600       9.1        75       917        90
IR     2025250    200200   19.6300  147.1900       9.9        91       940        67
IR     2025250    200200   19.5500  147.0200       9.1       102       881        71
IR     2025250    200200   19.5800  147.0000       9.5        99       892        70
IR     2025250    200200   19.5400  146.8600      11.3       136       330        74
IR     2025250    200200   19.5600  146.8000      11.3       137       328        73
IR     2025250    200200   19.6200  146.6900      11.7       136       331        69
IR     2025250    200200   19.5600  146.5500      12.0       133       327        86
IR     2025250    200200   19.6200  146.4300      11.9       134       299        82
IR     2025250    200200   19.6200  146.3500      11.2       133       275        88
IR     2025250    200200   19.5600  146.2700      10.0       123       258        94
IR     2025250    200200   19.6200  146.2200      11.7       132       255        87
IR     2025250    200200   19.6200  146.1200      11.9       130       239        85
IR     2025250    200200   19.5900  145.9800      14.0       128       218        89
IR     2025250    200200   19.5700  145.8600      15.6       131       213        87
IR     2025250    200200   19.6100  145.8200      15.6       130       215        87
IR     2025250    200200   19.5300  145.6800      15.4       125       214        93
IR     2025250    200200   19.5500  145.5600      15.5       114       222        96
IR     2025250    200200   19.5500  145.4800      15.0       109       224        95
IR     2025250    200200   19.5900  145.4300      15.1       109       229        94
IR     2025250    200200   19.5900  145.2900      18.3       110       229        87
IR     2025250    200200   19.5300  145.2100      23.1       103       229        84
IR     2025250    200200   19.5200  144.8500      15.3       116       228        95
IR     2025250    200200   19.5400  144.8200      14.3       119       228        97
IR     2025250    200200   19.5400  144.7400      14.1       120       230        92
IR     2025250    200200   19.5800  144.5600      17.4       124       236        86
IR     2025250    200200   19.5800  144.4800      16.5       134       236        89
IR     2025250    200200   19.6000  144.4300      16.3       135       235        91
IR     2025250    200200   19.5400  144.2900      14.2       146       232        79
IR     2025250    200200   19.5800  144.1900      11.9       148       231        80
IR     2025250    200200   19.5800  144.1100      10.9       166       229        83
IR     2025250    200200   19.6000  143.8200       8.8       188       231        78
IR     2025250    200200   19.5800  143.7200       7.6       189       234        84
IR     2025250    200200   19.5800  143.6600       7.2       190       238        85
IR     2025250    200200   19.5500  143.5100       7.5       196       247        81
IR     2025250    200200   19.5300  143.4800       7.4       192       250        80
IR     2025250    200200   19.5900  143.3700       8.9       211       290        66
IR     2025250    200200   19.5100  142.9200       5.8       204       311        62
IR     2025250    200200   19.5100  142.8200       5.2       200       307        65
IR     2025250    200200   19.5100  142.7800       4.9       199       302        66
IR     2025250    200200   19.5900  142.6500       4.2       180       301        64
IR     2025250    200200   19.5200  147.9300       7.4        77       894        77
IR     2025250    200200   19.5300  147.8700       6.9        82       888        75
IR     2025250    200200   19.5100  147.7300       7.7        85       902        69
IR     2025250    200200   19.4900  147.2300       9.5        94       929        63
IR     2025250    200200   19.4500  147.1300      10.2       119       919        60
IR     2025250    200200   19.4500  147.0300       9.8       123       882        68
IR     2025250    200200   19.4700  147.0200       9.6       120       893        68
IR     2025250    200200   19.4400  146.9000      10.5       136       316        77
IR     2025250    200200   19.4600  146.8000      10.3       133       326        69
IR     2025250    200200   19.4400  146.6800      10.9       132       330        81
IR     2025250    200200   19.4800  146.5400      12.0       133       317        85
IR     2025250    200200   19.5000  146.3300      10.5       125       259        93
IR     2025250    200200   19.5200  146.2500       9.6       120       253        92
IR     2025250    200200   19.4600  146.1300      10.1       113       228        89
IR     2025250    200200   19.5000  146.0500      11.6       120       217        93
IR     2025250    200200   19.5100  145.9100      15.2       128       213        88
IR     2025250    200200   19.4900  145.8100      15.4       126       213        88
IR     2025250    200200   19.4700  145.6700      14.5       120       213        96
IR     2025250    200200   19.4500  145.5800      14.8       113       214        96
IR     2025250    200200   19.4700  145.5600      14.7       113       215        96
IR     2025250    200200   19.5100  145.4400      15.1       108       222        95
IR     2025250    200200   19.4700  145.3000      20.9        99       221        81
IR     2025250    200200   19.4300  145.1800      27.8        96       216        83
IR     2025250    200200   19.5000  144.7900      11.5       127       227        87
IR     2025250    200200   19.5000  144.7700      11.4       128       227        84
IR     2025250    200200   19.4800  144.6000      13.0       136       227        91
IR     2025250    200200   19.4800  144.5800      13.4       137       228        91
IR     2025250    200200   19.5000  144.4800      15.8       140       234        91
IR     2025250    200200   19.4800  144.3000      14.9       144       226        77
IR     2025250    200200   19.4600  144.2400      13.3       146       221        66
IR     2025250    200200   19.4200  144.0800       9.5       186       222        67
IR     2025250    200200   19.4400  143.9300       9.1       200       232        77
IR     2025250    200200   19.4200  143.7100       8.2       198       242        71
IR     2025250    200200   19.4200  143.6900       8.2       198       243        72
IR     2025250    200200   19.4600  143.5800       6.9       187       247        86
IR     2025250    200200   19.4900  143.4400       7.3       191       255        77
IR     2025250    200200   19.4500  143.4000       7.2       198       264        75
IR     2025250    200200   19.4100  143.3000       6.7       204       284        61
IR     2025250    200200   19.4300  142.7400       4.7       195       319        64
IR     2025250    200200   19.4100  147.5500       7.6        91       891        88
IR     2025250    200200   19.3700  147.4400       8.1        91       888        85
IR     2025250    200200   19.4300  147.3700       8.8        95       909        70
IR     2025250    200200   19.3500  147.2400       9.6       114       881        60
IR     2025250    200200   19.4300  147.0300      10.1       127       878        70
IR     2025250    200200   19.4000  146.9300      10.3       136       312        76
IR     2025250    200200   19.4200  146.9100      10.4       136       314        77
IR     2025250    200200   19.3400  146.7300      10.0       127       328        84
IR     2025250    200200   19.4200  146.7000      10.7       132       329        79
IR     2025250    200200   19.3800  146.5500      10.5       126       304        83
IR     2025250    200200   19.3600  146.3400      12.0       135       255        86
IR     2025250    200200   19.3600  146.1600       9.7       116       220        78
IR     2025250    200200   19.3800  146.1400      10.1       115       220        82
IR     2025250    200200   19.4200  146.0100      13.0       120       213        90
IR     2025250    200200   19.3900  145.8900      14.1       125       213        90
IR     2025250    200200   19.3300  145.8400      12.9       125       212        91
IR     2025250    200200   19.3500  145.6900      14.1       110       211        97
IR     2025250    200200   19.3900  145.6300      15.2       110       211        96
IR     2025250    200200   19.4100  145.5100      15.7       110       212        94
IR     2025250    200200   19.3300  145.3700      18.2       100       207        81
IR     2025250    200200   19.3500  145.3500      18.3       100       211        83
IR     2025250    200200   19.4100  145.2000      24.7        96       209        73
IR     2025250    200200   19.4100  145.1600      27.6        97       204        82
IR     2025250    200200   19.4100  144.8900       9.1       142       193        75
IR     2025250    200200   19.3800  144.5100      11.3       153       202        67
IR     2025250    200200   19.4000  144.4000      14.1       142       209        81
IR     2025250    200200   19.4000  144.3800      14.2       141       209        82
IR     2025250    200200   19.4000  144.2800      12.5       147       212        82
IR     2025250    200200   19.4000  144.1000       9.5       182       218        66
IR     2025250    200200   19.4000  144.0200       9.4       194       225        65
IR     2025250    200200   19.3600  143.9600       8.4       195       229        67
IR     2025250    200200   19.4000  143.6700       8.1       196       248        68
IR     2025250    200200   19.3400  143.5300       5.6       187       254        64
IR     2025250    200200   19.3200  143.4900       4.8       188       259        64
IR     2025250    200200   19.3700  143.3600       6.4       205       268        77
IR     2025250    200200   19.3700  143.3200       6.3       206       275        70
IR     2025250    200200   19.3300  147.5200       7.6        97       881        88
IR     2025250    200200   19.3300  147.4800       7.8        97       878        88
IR     2025250    200200   19.2900  147.3200       8.4       111       846        61
IR     2025250    200200   19.2900  147.2200       9.2       117       802        65
IR     2025250    200200   19.2700  147.0200       8.5       130       334        65
IR     2025250    200200   19.3100  146.9800       8.6       131       314        69
IR     2025250    200200   19.3200  146.8300       9.4       125       317        61
IR     2025250    200200   19.3200  146.7900       9.5       124       324        66
IR     2025250    200200   19.3200  146.7100       9.7       126       330        86
IR     2025250    200200   19.2800  146.5300      10.6       126       283        86
IR     2025250    200200   19.2600  146.4300      11.7       134       270        82
IR     2025250    200200   19.2600  146.3700      11.4       134       256        81
IR     2025250    200200   19.3000  146.2300      10.7       129       226        73
IR     2025250    200200   19.3200  146.2000       9.5       119       223        72
IR     2025250    200200   19.2800  146.0900      11.6       121       215        91
IR     2025250    200200   19.2400  145.9300      12.2       125       211        88
IR     2025250    200200   19.2400  145.9200      12.4       126       211        88
IR     2025250    200200   19.2300  145.7600      11.9       113       209        92
IR     2025250    200200   19.2300  145.6400      15.7       102       198        96
IR     2025250    200200   19.2300  145.6000      17.0        99       196        98
IR     2025250    200200   19.2900  145.5300      17.4        99       206        85
IR     2025250    200200   19.3100  145.3900      18.5        98       200        79
IR     2025250    200200   19.3100  145.3300      19.9        96       194        76
IR     2025250    200200   19.2300  145.1900      17.7       105       179        65
IR     2025250    200200   19.2300  145.1300      16.4       109       176        76
IR     2025250    200200   19.2300  144.9700      10.8       128       174        87
IR     2025250    200200   19.2300  144.9100       8.1       139       175        82
IR     2025250    200200   19.2500  144.8400       5.4       159       180        65
IR     2025250    200200   19.3000  144.3900      11.1       148       198        63
IR     2025250    200200   19.3000  144.3300      11.4       151       202        63
IR     2025250    200200   19.2800  144.2500      11.7       164       206        65
IR     2025250    200200   19.2400  144.0900      10.3       185       211        65
IR     2025250    200200   19.3000  143.9800       8.7       194       222        61
IR     2025250    200200   19.2800  143.8800       8.3       189       236        77
IR     2025250    200200   19.2600  143.8600       8.1       189       239        78
IR     2025250    200200   19.2200  143.6800       8.3       169       250        86
IR     2025250    200200   19.2200  143.6600       8.1       169       251        81
IR     2025250    200200   19.2800  143.4900       4.6       180       261        62
IR     2025250    200200   19.2400  143.4100       4.4       177       265        66
IR     2025250    200200   19.2200  143.3700       4.4       174       267        72
IR     2025250    200200   19.2200  143.2800       4.4       191       271        73
IR     2025250    200200   19.2500  143.1800       5.9       201       291        65
IR     2025250    200200   19.2900  142.6800       4.1       180       337        62
IR     2025250    200200   19.1800  147.7600      12.0        46       936        99
IR     2025250    200200   19.1700  147.6100       8.3        71       881        74
IR     2025250    200200   19.2100  147.3900       6.8        92       802        61
IR     2025250    200200   19.1900  147.3700       6.8        94       768        65
IR     2025250    200200   19.2300  146.9000       8.5       123       314        63
IR     2025250    200200   19.1400  146.7900       8.2       100       338        68
IR     2025250    200200   19.2200  146.4500      10.9       128       272        82
IR     2025250    200200   19.2000  146.3800      10.2       124       253        78
IR     2025250    200200   19.2000  146.3300      10.7       128       232        80
IR     2025250    200200   19.1400  146.1600      10.7       125       215        86
IR     2025250    200200   19.1800  146.1300      11.3       125       214        82
IR     2025250    200200   19.1400  145.9900      11.5       122       210        89
IR     2025250    200200   19.2200  145.9300      12.1       126       210        88
IR     2025250    200200   19.2100  145.7600      11.9       116       207        90
IR     2025250    200200   19.1700  145.6800      14.6       113       192        93
IR     2025250    200200   19.2100  145.6200      16.6       102       192        96
IR     2025250    200200   19.1300  145.4600      19.0        95       180        85
IR     2025250    200200   19.1300  145.4400      18.8        97       178        82
IR     2025250    200200   19.1300  145.3200      16.8       102       169        83
IR     2025250    200200   19.1500  145.2200      14.8       112       170        73
IR     2025250    200200   19.1300  145.0900      13.7       125       165        93
IR     2025250    200200   19.1500  145.0500      12.4       128       168        93
IR     2025250    200200   19.2100  144.9500       9.4       132       173        85
IR     2025250    200200   19.2100  144.8000       4.6       158       178        66
IR     2025250    200200   19.1300  144.6200       6.9       153       181        65
IR     2025250    200200   19.1200  144.5000       6.7       150       186        66
IR     2025250    200200   19.1200  144.3800       8.3       146       190        86
IR     2025250    200200   19.1200  144.3200       9.5       150       192        88
IR     2025250    200200   19.1800  144.1900      12.0       171       203        86
IR     2025250    200200   19.1200  144.0900      11.1       170       206        73
IR     2025250    200200   19.1400  144.0100       9.8       182       214        65
IR     2025250    200200   19.1400  143.8900       8.8       187       229        82
IR     2025250    200200   19.1200  143.8500       8.7       189       238        83
IR     2025250    200200   19.1600  143.5400       8.1       150       257        74
IR     2025250    200200   19.1200  143.4300       6.6       157       264        68
IR     2025250    200200   19.2000  143.3700       4.7       168       267        75
IR     2025250    200200   19.2000  143.2500       4.7       191       271        70
IR     2025250    200200   19.1400  143.2100       5.1       191       275        73
IR     2025250    200200   19.1200  143.1100       5.1       190       336        76
IR     2025250    200200   19.0800  147.7000      10.1        55       907        95
IR     2025250    200200   19.0500  147.4800       7.0        95       767        79
IR     2025250    200200   19.0500  147.4600       6.9        90       756        81
IR     2025250    200200   19.0500  146.8500       9.0        86       337        81
IR     2025250    200200   19.0400  146.3900       9.8        80       247        93
IR     2025250    200200   19.0400  146.2800       9.8       102       220        82
IR     2025250    200200   19.0400  146.2400       9.7       108       217        80
IR     2025250    200200   19.0400  146.0600      11.2       123       207        90
IR     2025250    200200   19.1200  145.9900      11.6       121       209        90
IR     2025250    200200   19.0400  145.9200      12.2       127       197        87
IR     2025250    200200   19.0800  145.7900      13.6       131       193        80
IR     2025250    200200   19.1000  145.7500      13.5       125       192        89
IR     2025250    200200   19.0300  145.5700      14.9       106       174        89
IR     2025250    200200   19.0300  145.5500      15.1       104       169        86
IR     2025250    200200   19.1100  145.4600      18.1        97       175        83
IR     2025250    200200   19.1100  145.2800      15.8       107       165        83
IR     2025250    200200   19.0700  145.2400      15.1       114       159        76
IR     2025250    200200   19.1100  145.0800      14.0       127       163        93
IR     2025250    200200   19.0900  145.0600      13.3       133       162        95
IR     2025250    200200   19.1100  144.9100      10.4       142       167        93
IR     2025250    200200   19.0900  144.8300       8.2       143       169        88
IR     2025250    200200   19.0700  144.7500       8.5       148       170        89
IR     2025250    200200   19.1100  144.6500       7.8       152       177        78
IR     2025250    200200   19.0900  144.5400       7.7       149       183        76
IR     2025250    200200   19.0200  144.4000       8.5       145       188        92
IR     2025250    200200   19.0600  144.3200       9.4       147       191        94
IR     2025250    200200   19.0400  144.2800      10.2       152       194        95
IR     2025250    200200   19.1000  144.1100      11.4       167       203        77
IR     2025250    200200   19.1000  144.0900      11.1       169       205        76
IR     2025250    200200   19.0400  143.9100       9.4       192       224        63
IR     2025250    200200   19.0200  143.6600      11.7       154       256        97
IR     2025250    200200   19.0200  143.6000      12.4       149       258        99
IR     2025250    200200   19.0400  143.4800       9.3       154       263        89
IR     2025250    200200   19.1000  143.4300       6.8       157       265        68
IR     2025250    200200   19.0200  143.2700       5.4       165       272        73
IR     2025250    200200   19.0800  143.1900       5.2       183       279        74
IR     2025250    200200   19.0200  143.1300       5.1       172       300        73
IR     2025250    200200   19.0400  147.6900       9.7        55       895        94
IR     2025250    200200   19.0100  147.5000       6.1        78       455        93
IR     2025250    200200   19.0100  146.8200       9.5        77       342        89
IR     2025250    200200   18.9500  146.7800      10.7        59       335        85
IR     2025250    200200   18.9700  146.6600       9.8        63       307        96
IR     2025250    200200   19.0000  146.5100      10.3        61       279        98
IR     2025250    200200   18.9400  146.4300      10.7        54       269        90
IR     2025250    200200   18.9600  146.3300      10.0        69       222        82
IR     2025250    200200   18.9600  146.2900       9.7        74       219        78
IR     2025250    200200   18.9400  146.1100      10.4       114       208        83
IR     2025250    200200   18.9600  146.0900      10.5       117       206        83
IR     2025250    200200   18.9600  145.9200      11.8       126       193        68
IR     2025250    200200   18.9800  145.6600      14.2       141       181        88
IR     2025250    200200   19.0100  145.5700      14.3       110       168        86
IR     2025250    200200   18.9300  145.4300      12.8       122       156        85
IR     2025250    200200   18.9500  145.3700      13.7       117       154        81
IR     2025250    200200   18.9900  145.3100      14.4       118       154        84
IR     2025250    200200   18.9300  145.1500      15.2       133       154        93
IR     2025250    200200   18.9900  145.1200      14.3       134       156        92
IR     2025250    200200   18.9900  144.9600      12.7       143       162        95
IR     2025250    200200   18.9300  144.7400      11.6       156       169        97
IR     2025250    200200   19.0000  144.3900       8.5       146       188        92
IR     2025250    200200   19.0000  144.3700       8.6       146       189        92
IR     2025250    200200   18.9200  144.2100       9.4       159       196        97
IR     2025250    200200   18.9600  144.1600      10.7       164       198        93
IR     2025250    200200   18.9800  144.0000      10.6       175       206        72
IR     2025250    200200   18.9800  143.9100       9.8       185       221        64
IR     2025250    200200   19.0000  143.8300       9.5       186       241        78
IR     2025250    200200   18.9600  143.5400      12.7       154       264        97
IR     2025250    200200   18.9800  143.5200      12.2       153       263        96
IR     2025250    200200   18.9400  143.3800       7.9       173       268        82
IR     2025250    200200   19.0000  143.2500       5.5       166       273        79
IR     2025250    200200   19.0000  143.2300       5.4       167       275        85
IR     2025250    200200   18.9600  143.1300       4.7       167       299        71
IR     2025250    200200   18.9000  148.0800      10.4        43       942        99
IR     2025250    200200   18.8600  147.9200      10.4        30       917        94
IR     2025250    200200   18.9000  147.8800      10.2        35       904        94
IR     2025250    200200   18.9400  147.8100      10.4        38       897        94
IR     2025250    200200   18.8800  147.5800       6.8        55       433        80
IR     2025250    200200   18.8900  147.4900       7.0        71       425        84
IR     2025250    200200   18.8700  146.8500      10.8        63       347        92
IR     2025250    200200   18.8900  146.6800      11.0        56       308        87
IR     2025250    200200   18.8700  146.6400      11.0        54       297        87
IR     2025250    200200   18.9200  146.4800      10.4        51       278        90
IR     2025250    200200   18.9000  146.4000      10.5        55       256        89
IR     2025250    200200   18.9200  146.3100      10.1        68       220        80
IR     2025250    200200   18.9000  146.2300       9.6        85       216        90
IR     2025250    200200   18.9200  146.1100      10.4       109       208        85
IR     2025250    200200   18.9000  146.0500      10.5       104       195        96
IR     2025250    200200   18.9200  145.9300      11.7       119       192        63
IR     2025250    200200   18.9200  145.6800      12.9       143       168        81
IR     2025250    200200   18.8800  145.5600      10.2       133       159        78
IR     2025250    200200   18.8300  145.4000      12.9       121       152        86
IR     2025250    200200   18.8300  145.3000      15.3       118       152        91
IR     2025250    200200   18.8300  145.2800      15.8       119       153        91
IR     2025250    200200   18.8700  145.1700      16.4       130       155        92
IR     2025250    200200   18.8700  145.0700      17.4       133       160        93
IR     2025250    200200   18.8900  144.9100      15.1       136       166        97
IR     2025250    200200   18.8700  144.8700      13.4       140       168        95
IR     2025250    200200   18.9100  144.7600      12.0       154       169        94
IR     2025250    200200   18.8300  144.6800      11.7       162       178        97
IR     2025250    200200   18.8900  144.5600      13.6       157       182        99
IR     2025250    200200   18.8900  144.4500      10.9       159       186        95
IR     2025250    200200   18.8900  144.3700       9.4       157       188        91
IR     2025250    200200   18.8900  144.2500       9.0       160       193        91
IR     2025250    200200   18.8300  144.1900       9.9       171       197        92
IR     2025250    200200   18.8600  144.0600      12.7       167       206        91
IR     2025250    200200   18.8200  143.9400      12.4       172       217        85
IR     2025250    200200   18.9000  143.8400      10.2       175       234        82
IR     2025250    200200   18.8600  143.5700      11.8       161       278        88
IR     2025250    200200   18.8600  143.3200       6.7       186       271        70
IR     2025250    200200   18.8800  143.2200       5.6       176       275        72
IR     2025250    200200   18.9000  143.1400       4.7       171       285        72
IR     2025250    200200   18.8200  143.0800       4.5       171       296        71
IR     2025250    200200   18.8400  148.0800      10.2        39       942        97
IR     2025250    200200   18.7600  147.9100       9.5        28       907        87
IR     2025250    200200   18.8200  147.8800       9.8        29       897        89
IR     2025250    200200   18.8000  147.5200       8.1        52       415        86
IR     2025250    200200   18.7700  146.8700      10.2        61       354        95
IR     2025250    200200   18.7900  146.7500      12.0        54       331        93
IR     2025250    200200   18.7500  146.6700      11.4        55       308        87
IR     2025250    200200   18.7500  146.6300      11.6        52       299        84
IR     2025250    200200   18.8300  146.5400      10.9        52       281        93
IR     2025250    200200   18.8200  146.3800      11.3        54       242        71
IR     2025250    200200   18.7600  146.3400      11.9        54       229        75
IR     2025250    200200   18.7600  146.2400      10.4        64       216        82
IR     2025250    200200   18.7400  146.1200      10.8        84       202        84
IR     2025250    200200   18.7600  146.0400      11.2        93       193        94
IR     2025250    200200   18.8200  145.9300      12.2       129       190        76
IR     2025250    200200   18.7400  145.7900      13.3       151       167        76
IR     2025250    200200   18.7800  145.7500      14.7       161       164        80
IR     2025250    200200   18.8000  145.6500      12.6       157       160        79
IR     2025250    200200   18.7600  145.5100      11.7       146       156        85
IR     2025250    200200   18.7800  145.3800      14.4       114       154        84
IR     2025250    200200   18.7800  145.3600      15.2       113       154        84
IR     2025250    200200   18.8100  145.2600      17.1       117       155        90
IR     2025250    200200   18.7300  145.1000      25.4       113       168        82
IR     2025250    200200   18.7900  145.0500      21.3       121       165        81
IR     2025250    200200   18.7900  144.9700      19.2       127       171        90
IR     2025250    200200   18.7300  144.7900      14.4       157       180        93
IR     2025250    200200   18.7300  144.7700      14.1       161       181        91
IR     2025250    200200   18.7500  144.6300      12.3       166       183        94
IR     2025250    200200   18.7300  144.5700      13.4       167       186        91
IR     2025250    200200   18.7300  144.4600      15.1       170       188        88
IR     2025250    200200   18.7900  144.3100      12.7       168       189        93
IR     2025250    200200   18.7900  144.2100      11.2       172       194        89
IR     2025250    200200   18.7500  144.1700      12.2       175       197        90
IR     2025250    200200   18.7800  144.0700      11.6       171       205        89
IR     2025250    200200   18.7800  143.9200      12.0       171       221        88
IR     2025250    200200   18.7200  143.8900      11.8       169       229        89
IR     2025250    200200   18.8000  143.7800      10.8       173       245        89
IR     2025250    200200   18.8000  143.5300      11.0       168       285        83
IR     2025250    200200   18.7800  143.4100       8.5       176       275        79
IR     2025250    200200   18.7600  143.2500       6.5       193       271        81
IR     2025250    200200   18.7600  143.2400       6.3       192       271        80
IR     2025250    200200   18.7200  143.0600       4.5       180       292        73
IR     2025250    200200   18.7200  143.0400       4.3       178       297        72
IR     2025250    200200   18.6800  148.0400      10.9        31       926        97
IR     2025250    200200   18.7400  147.9100       9.5        28       907        87
IR     2025250    200200   18.6800  147.6700      10.5        21       407        87
IR     2025250    200200   18.6500  147.0400       8.3        68       399        91
IR     2025250    200200   18.6500  147.0000       8.1        74       382        90
IR     2025250    200200   18.7100  146.8600      10.0        60       358        90
IR     2025250    200200   18.6700  146.8200      10.3        60       354        91
IR     2025250    200200   18.7300  146.6500      11.8        50       304        83
IR     2025250    200200   18.7100  146.5700      12.3        48       287        85
IR     2025250    200200   18.6900  146.5300      12.3        48       282        83
IR     2025250    200200   18.6500  146.4300      10.5        64       259        90
IR     2025250    200200   18.7000  146.3100      10.8        64       229        96
IR     2025250    200200   18.6400  146.1500      10.4        82       213        82
IR     2025250    200200   18.7000  146.1400      10.8        80       209        86
IR     2025250    200200   18.6600  146.0000      11.7       105       188        75
IR     2025250    200200   18.6600  145.8800      11.1       127       172        78
IR     2025250    200200   18.7200  145.8000      12.6       145       168        76
IR     2025250    200200   18.6800  145.7400      11.8       157       164        83
IR     2025250    200200   18.6800  145.5700      13.3       152       158        84
IR     2025250    200200   18.7000  145.5500      12.5       144       158        86
IR     2025250    200200   18.6600  145.4100      15.3       118       161        91
IR     2025250    200200   18.6800  145.3300      17.5       106       162        97
IR     2025250    200200   18.6400  145.1700      23.3       103       174        79
IR     2025250    200200   18.6300  145.1300      24.3       107       178        71
IR     2025250    200200   18.6300  144.8200      18.5       162       186        90
IR     2025250    200200   18.6700  144.6900      13.6       165       186        95
IR     2025250    200200   18.6500  144.6700      13.2       163       188        95
IR     2025250    200200   18.6900  144.5300      13.7       168       188        91
IR     2025250    200200   18.7100  144.4600      15.1       171       188        89
IR     2025250    200200   18.6300  144.3000      16.9       176       189        91
IR     2025250    200200   18.7100  144.2000      13.5       176       194        92
IR     2025250    200200   18.6500  144.1000      12.4       176       201        93
IR     2025250    200200   18.6500  144.0800      11.8       176       203        91
IR     2025250    200200   18.6700  143.9500      11.6       170       218        93
IR     2025250    200200   18.7000  143.8700      11.7       170       234        89
IR     2025250    200200   18.6200  143.6000       9.6       169       296        87
IR     2025250    200200   18.6800  143.4500       9.6       173       298        75
IR     2025250    200200   18.6600  143.3500       8.2       184       282        72
IR     2025250    200200   18.6400  143.3100       7.9       189       276        75
IR     2025250    200200   18.7000  143.1600       5.2       187       270        82
IR     2025250    200200   18.7000  143.0600       4.8       179       287        75
IR     2025250    200200   18.6600  143.0400       5.4       174       287        76
IR     2025250    200200   18.5600  148.0300      12.7        31       925        99
IR     2025250    200200   18.5600  147.8000       8.5        30       400        83
IR     2025250    200200   18.5500  147.0300       8.8        61       405        94
IR     2025250    200200   18.5500  147.0100       8.6        64       394        93
IR     2025250    200200   18.6300  146.9000       8.6        75       374        83
IR     2025250    200200   18.6100  146.7600      10.7        55       342        91
IR     2025250    200200   18.5500  146.4800      11.1        47       276        85
IR     2025250    200200   18.6300  146.4200      10.3        65       259        88
IR     2025250    200200   18.6100  146.3300       9.9        70       243        86
IR     2025250    200200   18.6000  146.2300       9.3        74       222        82
IR     2025250    200200   18.5600  146.1100      10.2        92       196        81
IR     2025250    200200   18.5800  146.0100      10.8       110       185        73
IR     2025250    200200   18.6200  145.9000      10.9       124       173        77
IR     2025250    200200   18.6200  145.7800      11.5       150       167        83
IR     2025250    200200   18.5800  145.7000      13.0       158       164        85
IR     2025250    200200   18.5800  145.6200      15.0       159       162        84
IR     2025250    200200   18.5800  145.5200      16.3       149       161        81
IR     2025250    200200   18.5400  145.4200      15.9       122       166        85
IR     2025250    200200   18.5400  145.3400      19.0       102       171        83
IR     2025250    200200   18.6000  145.1900      23.7       101       179        74
IR     2025250    200200   18.6000  145.1500      24.0       104       182        77
IR     2025250    200200   18.5900  144.8600      21.0       166       189        69
IR     2025250    200200   18.5500  144.7800      19.7       168       192        78
IR     2025250    200200   18.6100  144.6500      12.9       162       189        95
IR     2025250    200200   18.5700  144.5700      11.4       169       191        91
IR     2025250    200200   18.6100  144.4900      13.1       171       189        91
IR     2025250    200200   18.5300  144.3100      15.4       181       191        89
IR     2025250    200200   18.5300  144.2500      15.5       181       192        89
IR     2025250    200200   18.5300  144.1400      13.9       181       200        93
IR     2025250    200200   18.5900  144.0200      10.6       184       208        83
IR     2025250    200200   18.5500  143.9200      10.8       178       221        87
IR     2025250    200200   18.5300  143.9000      11.1       177       222        88
IR     2025250    200200   18.6000  143.4400       9.6       176       303        81
IR     2025250    200200   18.6000  143.0200       6.3       168       283        80
IR     2025250    200200   18.5400  142.8800       5.1       155       335        67
IR     2025250    200200   18.4600  147.9900      12.2        38       930       100
IR     2025250    200200   18.4600  147.8900       6.5        49       400        88
IR     2025250    200200   18.5400  147.7900       8.6        30       398        83
IR     2025250    200200   18.5400  147.7800       9.4        26       396        82
IR     2025250    200200   18.5400  147.6400      13.1        22       389        85
IR     2025250    200200   18.5200  147.5800      14.5        20       393        84
IR     2025250    200200   18.5300  147.0300       9.0        60       405        94
IR     2025250    200200   18.4500  146.9200       9.1        65       393        89
IR     2025250    200200   18.4500  146.8400      10.2        61       381        95
IR     2025250    200200   18.4900  146.7700      11.3        44       366        96
IR     2025250    200200   18.4500  146.6700      14.6        26       330        88
IR     2025250    200200   18.4900  146.3400       8.7        70       248        82
IR     2025250    200200   18.4700  146.2800       8.8        67       238        95
IR     2025250    200200   18.4900  146.1400      10.0        85       213        80
IR     2025250    200200   18.5300  146.1200      10.1        89       203        80
IR     2025250    200200   18.5000  146.0200       9.8       104       181        68
IR     2025250    200200   18.4800  145.8700       9.3       118       171        78
IR     2025250    200200   18.4600  145.7500       8.8       134       169        87
IR     2025250    200200   18.5200  145.6900      11.1       150       166        85
IR     2025250    200200   18.5000  145.5600      14.4       149       164        83
IR     2025250    200200   18.4400  145.4500      14.9       137       167        87
IR     2025250    200200   18.4400  145.4400      15.1       133       169        88
IR     2025250    200200   18.4400  145.2600      17.6       105       181        92
IR     2025250    200200   18.4400  145.2400      16.8       106       181        79
IR     2025250    200200   18.4700  144.8300      23.5       164       197        88
IR     2025250    200200   18.4300  144.6900      17.0       171       199        91
IR     2025250    200200   18.4900  144.6000      13.3       163       194        76
IR     2025250    200200   18.4300  144.5000      12.0       174       193        90
IR     2025250    200200   18.4300  144.4800      11.3       180       192        89
IR     2025250    200200   18.4500  144.3100      13.7       181       192        89
IR     2025250    200200   18.4500  144.2500      14.1       182       196        95
IR     2025250    200200   18.5100  144.1400      13.7       181       201        93
IR     2025250    200200   18.4700  144.0200      11.3       185       211        85
IR     2025250    200200   18.4700  144.0000      11.0       185       213        82
IR     2025250    200200   18.4500  143.8400      10.6       175       226        84
IR     2025250    200200   18.4300  143.8000      10.1       174       229        81
IR     2025250    200200   18.4300  143.5300      10.4       182       300        88
IR     2025250    200200   18.4400  143.3600       9.4       186       295        87
IR     2025250    200200   18.4600  143.2800       9.0       182       281        82
IR     2025250    200200   18.4200  143.2400       8.8       178       277        86
IR     2025250    200200   18.4800  142.7400       5.9       149       369        89
IR     2025250    200200   18.3700  148.0600      13.0        40       941        98
IR     2025250    200200   18.4400  147.8900       6.8        46       398        89
IR     2025250    200200   18.3600  147.8200       7.4        37       379        93
IR     2025250    200200   18.3800  147.3900      10.7        48       418        79
IR     2025250    200200   18.3600  146.9400      11.2        50       406        99
IR     2025250    200200   18.3500  146.9200      11.5        51       404        99
IR     2025250    200200   18.4100  146.7600      12.0        38       372        97
IR     2025250    200200   18.4100  146.6500      15.1        20       330        87
IR     2025250    200200   18.3500  146.6200      17.1        13       337        87
IR     2025250    200200   18.3500  146.5200      17.6        11       294        84
IR     2025250    200200   18.3500  146.4300      14.7        22       276        84
IR     2025250    200200   18.3900  146.2900      10.6        49       244        95
IR     2025250    200200   18.4300  146.1600       9.8        67       220        84
IR     2025250    200200   18.3900  146.1200      10.5        63       203        83
IR     2025250    200200   18.4300  146.0400       9.1        84       180        74
IR     2025250    200200   18.3700  145.9200      10.3        86       173        72
IR     2025250    200200   18.3800  145.8000       7.7       104       171        76
IR     2025250    200200   18.3800  145.7400       8.0       118       170        85
IR     2025250    200200   18.3400  145.5900       8.6       147       167        75
IR     2025250    200200   18.3400  145.4900      11.9       142       170        82
IR     2025250    200200   18.3600  145.3700      13.5       128       184        87
IR     2025250    200200   18.4200  145.2800      16.9       106       182        90
IR     2025250    200200   18.4200  145.2600      16.3       108       182        90
IR     2025250    200200   18.3400  144.8600      20.6       167       192        78
IR     2025250    200200   18.4100  144.7100      17.9       171       200        91
IR     2025250    200200   18.4100  144.6400      15.1       170       200        84
IR     2025250    200200   18.4100  144.5200      12.5       172       195        89
IR     2025250    200200   18.3500  144.4400      13.4       181       197        87
IR     2025250    200200   18.3700  144.4000      13.1       181       194        89
IR     2025250    200200   18.3900  144.2800      14.0       180       198        88
IR     2025250    200200   18.3500  144.1900      14.6       179       207        92
IR     2025250    200200   18.3300  144.0900      13.0       179       212        90
IR     2025250    200200   18.3300  143.9700      10.8       181       217        83
IR     2025250    200200   18.4100  143.8400      10.0       178       225        79
IR     2025250    200200   18.3500  143.7400       9.0       179       230        83
IR     2025250    200200   18.3300  143.7200       9.2       182       231        85
IR     2025250    200200   18.3300  143.5800      10.4       188       249        86
IR     2025250    200200   18.3300  143.4700      10.2       194       290        86
IR     2025250    200200   18.3500  143.4300       9.6       198       293        86
IR     2025250    200200   18.3700  143.3000       9.9       190       280        86
IR     2025250    200200   18.4000  143.2400       9.0       180       277        85
IR     2025250    200200   18.3200  142.7900       6.1       149       332        78
IR     2025250    200200   18.3500  148.1500      14.5        34       948        92
IR     2025250    200200   18.2700  148.0500      12.3        39       948        98
IR     2025250    200200   18.2900  148.0100      11.6        41       938        95
IR     2025250    200200   18.3300  147.8600       6.9        41       407        96
IR     2025250    200200   18.3000  147.8200       7.1        36       385        85
IR     2025250    200200   18.3200  147.6800       9.4        29       370        91
IR     2025250    200200   18.3000  147.5800      10.9        30       384        89
IR     2025250    200200   18.3000  147.5200      10.9        36       397        88
IR     2025250    200200   18.3000  147.3800      11.0        46       415        79
IR     2025250    200200   18.2600  146.9700      11.0        41       400        98
IR     2025250    200200   18.2600  146.9500      11.3        41       395        99
IR     2025250    200200   18.3100  146.8500      12.8        49       390        97
IR     2025250    200200   18.3300  146.6800      15.8        21       365        90
IR     2025250    200200   18.3100  146.6000      18.2        11       336        86
IR     2025250    200200   18.2700  146.5600      18.7         9       314        85
IR     2025250    200200   18.2900  146.4400      16.9        14       288        84
IR     2025250    200200   18.2700  146.3400      15.5        19       263        78
IR     2025250    200200   18.2500  146.2600      15.1        28       245        83
IR     2025250    200200   18.3300  146.0900      12.0        52       198        79
IR     2025250    200200   18.3100  146.0700      12.3        51       189        80
IR     2025250    200200   18.2500  145.9500      12.9        56       174        85
IR     2025250    200200   18.2500  145.8100      10.5        71       173        81
IR     2025250    200200   18.2900  145.7400       9.0        81       171        88
IR     2025250    200200   18.2400  145.6200       5.0       105       170        66
IR     2025250    200200   18.2800  145.5000       9.1       134       170        72
IR     2025250    200200   18.2400  145.4000       9.8       140       187        91
IR     2025250    200200   18.2400  145.3300       9.2       129       194        96
IR     2025250    200200   18.2600  145.2300       8.8       128       182        77
IR     2025250    200200   18.2400  145.1900       8.0       137       179        78
IR     2025250    200200   18.3200  144.8400      20.2       167       193        88
IR     2025250    200200   18.3000  144.8000      19.6       168       197        93
IR     2025250    200200   18.2600  144.6900      17.7       178       207        86
IR     2025250    200200   18.2400  144.6100      17.5       179       214        96
IR     2025250    200200   18.2700  144.4300      14.7       181       206        86
IR     2025250    200200   18.3100  144.4200      14.1       181       201        87
IR     2025250    200200   18.2900  144.3000      14.7       180       205        88
IR     2025250    200200   18.3100  144.1600      14.4       179       209        91
IR     2025250    200200   18.2300  144.1000      13.1       178       215        95
IR     2025250    200200   18.2700  143.9900      11.3       178       218        88
IR     2025250    200200   18.3100  143.8900       9.5       186       222        80
IR     2025250    200200   18.2900  143.8300       9.4       187       226        80
IR     2025250    200200   18.3100  143.7200       9.3       184       230        83
IR     2025250    200200   18.2300  143.6400      11.1       191       234        84
IR     2025250    200200   18.2300  143.4800       9.8       193       244        82
IR     2025250    200200   18.3100  143.4500       9.8       196       279        86
IR     2025250    200200   18.2500  143.3500       9.0       201       260        85
IR     2025250    200200   18.2300  143.1700      10.0       189       270        87
IR     2025250    200200   18.3000  142.9300       6.9       159       258        77
IR     2025250    200200   18.3000  142.8300       6.1       151       307        74
IR     2025250    200200   18.3000  142.7900       6.3       150       326        82
IR     2025250    200200   18.2800  142.6500       8.4       155       387        84
IR     2025250    200200   18.2100  148.1400      12.7        31       946        89
IR     2025250    200200   18.1900  148.0200      10.4        37       958        89
IR     2025250    200200   18.1700  147.6900       9.2        25       385        91
IR     2025250    200200   18.1800  147.5700      11.8        23       398        85
IR     2025250    200200   18.2400  147.5400      11.3        30       395        86
IR     2025250    200200   18.2400  147.4200      10.9        42       404        75
IR     2025250    200200   18.2400  146.9700      10.7        40       396        97
IR     2025250    200200   18.2200  146.9100      11.6        41       390        96
IR     2025250    200200   18.1600  146.7700      12.8        35       383        95
IR     2025250    200200   18.1600  146.7500      13.1        33       382        91
IR     2025250    200200   18.2300  146.6300      16.2        18       362        98
IR     2025250    200200   18.1500  146.5300      16.3        14       332        98
IR     2025250    200200   18.2300  146.2600      15.4        26       246        90
IR     2025250    200200   18.2300  146.1600      15.2        32       227        93
IR     2025250    200200   18.2100  146.0500      13.7        41       199        92
IR     2025250    200200   18.1700  145.9800      12.7        44       181        94
IR     2025250    200200   18.1700  145.8100      10.0        63       174        74
IR     2025250    200200   18.2300  145.7100       8.8        73       173        85
IR     2025250    200200   18.1700  145.5400       5.0       110       172        68
IR     2025250    200200   18.1500  145.4600       5.2       124       175        75
IR     2025250    200200   18.1800  145.3200       7.5       134       195        87
IR     2025250    200200   18.1600  145.3000       6.7       134       195        88
IR     2025250    200200   18.2200  145.1700       8.0       144       175        85
IR     2025250    200200   18.1800  145.1100       8.9       160       171        85
IR     2025250    200200   18.1400  144.9700      11.9       174       179        87
IR     2025250    200200   18.1400  144.8300      13.3       183       188        87
IR     2025250    200200   18.1400  144.7400      14.7       184       199        90
IR     2025250    200200   18.1600  144.7000      16.4       184       214        88
IR     2025250    200200   18.1800  144.6000      17.4       181       218        93
IR     2025250    200200   18.1600  144.4700      16.5       182       215        93
IR     2025250    200200   18.2000  144.4300      15.8       181       211        93
IR     2025250    200200   18.1400  144.2500      14.5       183       214        93
IR     2025250    200200   18.1400  144.1900      14.9       181       217        94
IR     2025250    200200   18.1300  144.1200      13.1       181       219        93
IR     2025250    200200   18.1900  143.9600      11.0       180       223        90
IR     2025250    200200   18.1300  143.9400      11.0       185       226        88
IR     2025250    200200   18.1700  143.7700      11.4       192       230        82
IR     2025250    200200   18.2100  143.6800      11.4       192       232        85
IR     2025250    200200   18.2100  143.6200      11.1       193       235        84
IR     2025250    200200   18.1500  143.4800       9.3       198       239        83
IR     2025250    200200   18.1300  143.4600       8.8       198       241        82
IR     2025250    200200   18.2100  143.2900      10.1       199       268        86
IR     2025250    200200   18.1300  143.1900      10.9       200       270        81
IR     2025250    200200   18.2100  143.1700      10.2       190       271        85
IR     2025250    200200   18.1500  142.8400       6.6       156       255        83
IR     2025250    200200   18.2000  142.7500       7.1       154       319        87
IR     2025250    200200   18.1300  142.6900       7.6       154       329        94
IR     2025250    200200   18.1600  142.5500       9.6       156       388        89
IR     2025250    200200   18.1500  148.0000       9.8        32       967        71
IR     2025250    200200   18.1300  147.6700       9.8        23       384        90
IR     2025250    200200   18.1400  147.5700      12.0        22       398        86
IR     2025250    200200   18.0900  147.5200      12.4        24       398        83
IR     2025250    200200   18.0600  147.3900      12.0        33       403        81
IR     2025250    200200   18.1400  146.9000      10.9        37       379        95
IR     2025250    200200   18.1400  146.7600      12.6        35       383        95
IR     2025250    200200   18.1400  146.7200      12.9        33       382        91
IR     2025250    200200   18.0800  146.6200      13.0        34       371        92
IR     2025250    200200   18.1100  146.5100      15.2        19       327        99
IR     2025250    200200   18.0700  146.3700      14.8        18       288        98
IR     2025250    200200   18.1100  146.1000      13.7        36       218        91
IR     2025250    200200   18.1300  146.0000      12.4        42       189        88
IR     2025250    200200   18.0900  145.9800      11.7        45       185        85
IR     2025250    200200   18.1100  145.8100      10.3        55       175        76
IR     2025250    200200   18.0500  145.7600      10.0        53       175        82
IR     2025250    200200   18.0900  145.6900       9.0        54       175        76
IR     2025250    200200   18.1000  145.3000       5.7       141       188        60
IR     2025250    200200   18.1200  145.1600       6.7       152       171        66
IR     2025250    200200   18.1200  145.1100       8.4       157       171        79
IR     2025250    200200   18.0600  144.9900      10.9       171       179        87
IR     2025250    200200   18.1200  144.8300      13.2       182       188        88
IR     2025250    200200   18.0400  144.7500      10.9       186       201        84
IR     2025250    200200   18.1200  144.7000      15.6       183       216        89
IR     2025250    200200   18.1000  144.5400      15.9       185       221        92
IR     2025250    200200   18.0400  144.4400      13.1       192       220        88
IR     2025250    200200   18.0400  144.3400      12.9       191       221        88
IR     2025250    200200   18.1000  144.2500      14.0       184       217        92
IR     2025250    200200   18.0400  144.2100      13.9       183       223        92
IR     2025250    200200   18.0400  144.0700      12.8       180       228        91
IR     2025250    200200   18.0400  144.0300      12.0       179       229        89
IR     2025250    200200   18.0700  143.9000      11.0       185       228        89
IR     2025250    200200   18.0300  143.8000      11.3       187       231        89
IR     2025250    200200   18.0300  143.7400      12.2       191       233        85
IR     2025250    200200   18.0700  143.5700      11.3       198       241        83
IR     2025250    200200   18.0300  143.5500      11.1       198       245        82
IR     2025250    200200   18.0500  143.3800       7.0       191       244        85
IR     2025250    200200   18.0300  143.3600       6.9       190       248        85
IR     2025250    200200   18.1100  143.1900      10.6       201       270        82
IR     2025250    200200   18.0900  143.1700      10.1       201       273        83
IR     2025250    200200   18.1100  142.9000       7.1       159       253        78
IR     2025250    200200   18.1100  142.7200       7.0       155       290        89
IR     2025250    200200   18.0500  142.7000       7.3       153       283        92
IR     2025250    200200   18.0300  142.6100       8.6       150       310        87
IR     2025250    200200   18.0300  148.1700      11.8        32       956        94
IR     2025250    200200   17.9900  148.0700      11.8        27       963        94
IR     2025250    200200   17.9900  147.9500      12.1        26       966        80
IR     2025250    200200   17.9900  147.8300      11.1        21       942        60
IR     2025250    200200   18.0500  147.5400      12.5        22       397        82
IR     2025250    200200   17.9700  147.5000      13.8        21       394        85
IR     2025250    200200   17.9700  147.3600      13.0        30       403        81
IR     2025250    200200   17.9700  147.3200      12.8        33       406        84
IR     2025250    200200   17.9800  146.9100       7.5        38       383        90
IR     2025250    200200   18.0400  146.7800      10.2        34       377        96
IR     2025250    200200   17.9600  146.6900       9.3        35       367        88
IR     2025250    200200   17.9800  146.5800      11.8        35       352        91
IR     2025250    200200   18.0400  146.4600      13.9        25       314        99
IR     2025250    200200   17.9600  146.4200      13.0        32       302        97
IR     2025250    200200   18.0100  146.2700      12.7        27       267        93
IR     2025250    200200   18.0100  146.1700      12.4        38       241        87
IR     2025250    200200   17.9900  146.1500      12.0        40       239        88
IR     2025250    200200   18.0300  145.9800      11.3        49       196        86
IR     2025250    200200   18.0100  145.9600      10.6        51       192        88
IR     2025250    200200   17.9500  145.8200       8.7        42       178        73
IR     2025250    200200   17.9500  145.7000       8.4        44       175        66
IR     2025250    200200   17.9500  145.6400       7.2        39       173        68
IR     2025250    200200   17.9500  145.1200       5.4       173       172        60
IR     2025250    200200   18.0000  145.0000       9.6       172       180        86
IR     2025250    200200   17.9400  144.9000       9.1       181       183        82
IR     2025250    200200   17.9400  144.8000       8.1       189       194        82
IR     2025250    200200   18.0000  144.6100      11.5       192       226        76
IR     2025250    200200   17.9600  144.5000      12.6       197       225        88
IR     2025250    200200   17.9400  144.3600       9.8       196       228        81
IR     2025250    200200   17.9400  144.3000      10.9       191       226        85
IR     2025250    200200   18.0200  144.2100      13.7       183       225        91
IR     2025250    200200   18.0200  144.0700      12.9       180       228        91
IR     2025250    200200   17.9600  143.9900      11.8       179       235        87
IR     2025250    200200   17.9800  143.9400      11.0       181       233        84
IR     2025250    200200   17.9400  143.8000      10.3       183       235        84
IR     2025250    200200   17.9900  143.7000      12.5       193       236        82
IR     2025250    200200   18.0100  143.5700      11.8       198       245        83
IR     2025250    200200   18.0100  143.5300      10.8       197       247        82
IR     2025250    200200   17.9300  143.4100       8.3       187       253        87
IR     2025250    200200   17.9300  143.3200       7.1       188       257        87
IR     2025250    200200   17.9500  143.2000       8.2       202       282        85
IR     2025250    200200   17.9300  143.1200       7.9       203       291        79
IR     2025250    200200   17.9500  143.0100       6.6       184       288        87
IR     2025250    200200   17.9300  142.9100       5.9       164       259        72
IR     2025250    200200   17.9300  142.8300       5.6       154       253        78
IR     2025250    200200   17.9300  142.7200       6.0       150       255        91
IR     2025250    200200   17.9300  142.6200       7.2       150       284        87
IR     2025250    200200   17.9500  142.5800       7.8       151       292        87
IR     2025250    200200   17.9500  147.7900      10.9        22       935        62
IR     2025250    200200   17.9300  147.7300      10.0        28       890        61
IR     2025250    200200   17.9500  147.6500      10.2        27       772        67
IR     2025250    200200   17.9500  147.4800      14.3        20       395        85
IR     2025250    200200   17.8900  147.4100      14.4        23       396        81
IR     2025250    200200   17.8900  147.3500      13.7        29       401        81
IR     2025250    200200   17.8600  146.9200       6.7        39       394        86
IR     2025250    200200   17.9000  146.8500       6.7        36       375        92
IR     2025250    200200   17.8600  146.7700       7.1        32       363        94
IR     2025250    200200   17.9400  146.6700       8.9        36       361        88
IR     2025250    200200   17.9200  146.5300      11.0        36       329        91
IR     2025250    200200   17.9000  146.4000      12.6        34       292        97
IR     2025250    200200   17.8600  146.3600      12.5        33       285        98
IR     2025250    200200   17.9400  146.2000      11.7        36       256        82
IR     2025250    200200   17.9200  146.1800      11.4        38       253        84
IR     2025250    200200   17.9100  145.8700       8.2        45       191        81
IR     2025250    200200   17.8900  145.7900       7.4        41       182        79
IR     2025250    200200   17.9100  145.6600       7.1        38       174        67
IR     2025250    200200   17.9300  145.6200       6.4        37       173        68
IR     2025250    200200   17.8500  145.3200       4.2       241       157        73
IR     2025250    200200   17.9100  145.0500       5.5       183       179        74
IR     2025250    200200   17.9300  145.0400       6.4       179       179        73
IR     2025250    200200   17.8900  144.9000       7.4       186       183        81
IR     2025250    200200   17.9200  144.7600       6.8       195       205        79
IR     2025250    200200   17.9200  144.4900      10.9       201       227        84
IR     2025250    200200   17.8400  144.3900       6.5       202       234        74
IR     2025250    200200   17.9000  144.3400       8.4       197       230        81
IR     2025250    200200   17.8800  144.2800       8.5       188       228        83
IR     2025250    200200   17.8800  144.1200      13.2       174       235        93
IR     2025250    200200   17.8800  144.0700      13.3       175       238        91
IR     2025250    200200   17.8800  143.9900      12.4       175       242        87
IR     2025250    200200   17.9200  143.8200      10.1       182       237        81
IR     2025250    200200   17.9200  143.7600      10.8       184       241        87
IR     2025250    200200   17.8400  143.4800       9.4       193       254        85
IR     2025250    200200   17.8600  143.4100       8.2       189       257        86
IR     2025250    200200   17.9100  143.3100       7.1       187       257        86
IR     2025250    200200   17.9100  143.1800       7.5       203       284        84
IR     2025250    200200   17.9100  143.0800       7.3       202       290        86
IR     2025250    200200   17.8900  143.0100       6.0       187       286        82
IR     2025250    200200   17.8300  142.9500       5.7       172       261        79
IR     2025250    200200   17.9100  142.8500       5.6       157       254        75
IR     2025250    200200   17.8300  142.7500       6.1       153       257        75
IR     2025250    200200   17.8500  142.5800       6.6       154       286        85
IR     2025250    200200   17.7700  147.7600      12.6        28       852        89
IR     2025250    200200   17.8500  147.6800       9.9        32       815        78
IR     2025250    200200   17.7700  147.6200       9.6        37       818        82
IR     2025250    200200   17.8500  147.5500       9.0        38       757        81
IR     2025250    200200   17.8200  146.9000       6.3        40       386        88
IR     2025250    200200   17.8400  146.6300       8.1        35       353        88
IR     2025250    200200   17.7800  146.5500       8.9        36       322        89
IR     2025250    200200   17.7600  146.5000       9.3        39       314        89
IR     2025250    200200   17.8400  146.3300      12.1        33       283        98
IR     2025250    200200   17.7600  146.2500      10.1        36       269        94
IR     2025250    200200   17.8400  146.1600       9.9        40       256        83
IR     2025250    200200   17.7600  146.1200       8.2        44       256        84
IR     2025250    200200   17.8400  145.9600       8.4        52       235        83
IR     2025250    200200   17.8000  145.9000       6.9        51       236        79
IR     2025250    200200   17.8100  145.7700       4.2        39       206        72
IR     2025250    200200   17.7500  145.5300       4.0       264       183        81
IR     2025250    200200   17.8100  145.3800       4.3       248       162        76
IR     2025250    200200   17.8100  145.3400       4.5       247       161        73
IR     2025250    200200   17.7500  145.2000       4.5       264       180        69
IR     2025250    200200   17.7500  144.8500       4.1       206       193        86
IR     2025250    200200   17.8300  144.7600       4.9       200       219        61
IR     2025250    200200   17.7700  144.6000       6.8       199       235        73
IR     2025250    200200   17.7500  144.5600       6.8       197       237        84
IR     2025250    200200   17.7400  144.4700       6.2       200       241        84
IR     2025250    200200   17.8000  144.3500       5.8       192       234        83
IR     2025250    200200   17.7400  144.2700       5.2       171       235        81
IR     2025250    200200   17.7600  143.7500      11.2       181       252        87
IR     2025250    200200   17.7400  143.6500      10.4       188       251        85
IR     2025250    200200   17.7400  143.6300      10.1       188       250        82
IR     2025250    200200   17.7800  143.4800       8.6       192       255        86
IR     2025250    200200   17.8000  143.4400       8.6       191       257        84
IR     2025250    200200   17.7400  143.2700       7.4       196       260        82
IR     2025250    200200   17.7400  143.2500       7.4       197       260        81
IR     2025250    200200   17.7900  142.9800       5.4       178       273        69
IR     2025250    200200   17.7700  142.8900       5.8       164       257        66
IR     2025250    200200   17.7900  142.7500       6.4       154       261        73
IR     2025250    200200   17.7300  147.8100      13.3        26       865        91
IR     2025250    200200   17.6900  147.7100      12.3        33       846        91
IR     2025250    200200   17.7500  147.6000       9.4        38       815        83
IR     2025250    200200   17.6700  147.5000       6.9        36       786        80
IR     2025250    200200   17.6900  147.4400       6.6        37       751        81
IR     2025250    200200   17.7300  147.3400       8.0        34       683        79
IR     2025250    200200   17.7300  146.8900       6.6        35       393        86
IR     2025250    200200   17.7400  146.7800       5.8        25       363        87
IR     2025250    200200   17.7400  146.7600       5.9        24       362        87
IR     2025250    200200   17.6600  146.6200       5.8        21       335        84
IR     2025250    200200   17.7400  146.5200       8.4        38       315        81
IR     2025250    200200   17.6800  146.3800       9.4        40       302        82
IR     2025250    200200   17.6800  146.3600       9.6        40       300        81
IR     2025250    200200   17.7400  146.2300       9.5        37       267        82
IR     2025250    200200   17.6800  146.1700       8.0        40       266        79
IR     2025250    200200   17.6600  146.0100       6.8        38       256        85
IR     2025250    200200   17.6800  145.9700       7.1        43       250        84
IR     2025250    200200   17.7300  145.5100       5.3       258       187        87
IR     2025250    200200   17.6700  145.4300       7.3       262       204        83
IR     2025250    200200   17.7100  145.3400       6.1       259       179        89
IR     2025250    200200   17.6700  145.2200       4.9       270       184        72
IR     2025250    200200   17.6500  144.5800       4.1       209       243        74
IR     2025250    200200   17.6700  144.5600       4.4       203       243        80
IR     2025250    200200   17.6500  144.3400       4.4       175       246        79
IR     2025250    200200   17.6400  143.9200      13.5       182       267        95
IR     2025250    200200   17.7200  143.7700      11.3       180       255        92
IR     2025250    200200   17.7200  143.6900      10.8       186       256        90
IR     2025250    200200   17.7200  143.6300       9.9       187       252        83
IR     2025250    200200   17.7200  143.4800       7.7       189       258        86
IR     2025250    200200   17.6400  143.4200       7.4       188       270        71
IR     2025250    200200   17.7200  143.2700       7.3       196       259        77
IR     2025250    200200   17.7200  143.2500       7.3       197       258        77
IR     2025250    200200   17.6400  142.9600       6.0       164       293        67
IR     2025250    200200   17.6400  142.8400       6.8       159       325        77
IR     2025250    200200   17.6900  142.5700       5.4       155       293        86
IR     2025250    200200   17.6200  147.7500      13.0        34       839        92
IR     2025250    200200   17.6500  147.6500      10.4        37       833        88
IR     2025250    200200   17.5800  147.6100       9.0        42       821        81
IR     2025250    200200   17.6100  147.4500       5.1        38       756        76
IR     2025250    200200   17.6100  147.3900       5.1        36       726        92
IR     2025250    200200   17.5700  147.3300       5.6        40       676        96
IR     2025250    200200   17.5900  146.8600       6.1        28       423        70
IR     2025250    200200   17.6400  146.5900       5.6        20       328        82
IR     2025250    200200   17.5900  146.4900       5.6        22       314        82
IR     2025250    200200   17.5700  146.4500       5.7        22       314        82
IR     2025250    200200   17.6200  146.3000       8.5        38       302        83
IR     2025250    200200   17.6200  146.2800       8.5        39       297        84
IR     2025250    200200   17.6400  146.1100       6.7        32       265        79
IR     2025250    200200   17.6400  146.0100       6.4        33       259        84
IR     2025250    200200   17.6400  145.9900       6.4        33       258        84
IR     2025250    200200   17.6000  145.8900       5.1        21       252        68
IR     2025250    200200   17.5800  145.4200       6.1       274       219        87
IR     2025250    200200   17.5500  145.0400       4.2       290       204        80
IR     2025250    200200   17.5500  144.8200       4.9       274       235        72
IR     2025250    200200   17.5500  144.7100       4.5       257       241        62
IR     2025250    200200   17.6100  144.3600       4.1       181       249        78
IR     2025250    200200   17.6000  143.9000      13.4       184       267        94
IR     2025250    200200   17.5600  143.7400      10.3       185       264        91
IR     2025250    200200   17.5400  143.6600       9.1       184       263        89
IR     2025250    200200   17.5800  143.6100       8.7       183       261        86
IR     2025250    200200   17.6000  143.5100       7.7       184       267        84
IR     2025250    200200   17.6000  143.2100       7.7       186       248        68
IR     2025250    200200   17.5400  142.9100       6.8       161       371        79
IR     2025250    200200   17.5400  147.7400      12.7        37       840        92
IR     2025250    200200   17.5000  147.6600      10.6        41       823        82
IR     2025250    200200   17.4800  147.5600       7.2        43       793        82
IR     2025250    200200   17.5200  147.5000       5.6        40       776        75
IR     2025250    200200   17.4800  147.4000       4.0        42       705        94
IR     2025250    200200   17.5500  147.3100       5.8        41       654        93
IR     2025250    200200   17.4900  146.7600       5.6        11       403        67
IR     2025250    200200   17.4900  146.7400       5.6         8       389        62
IR     2025250    200200   17.5100  146.5900       4.8       360       341        64
IR     2025250    200200   17.5500  146.4700       5.2        14       317        79
IR     2025250    200200   17.5300  146.4100       5.5        19       321        84
IR     2025250    200200   17.5200  146.2800       7.3        34       319        83
IR     2025250    200200   17.4600  146.1800       6.9        30       313        84
IR     2025250    200200   17.5400  146.1600       7.1        35       280        84
IR     2025250    200200   17.4600  145.9800       5.5         4       271        86
IR     2025250    200200   17.4800  145.9600       5.4         3       269        85
IR     2025250    200200   17.5400  145.4200       6.3       278       221        86
IR     2025250    200200   17.5000  145.3400       7.6       281       220        90
IR     2025250    200200   17.4800  145.2800       7.8       283       218        90
IR     2025250    200200   17.5000  145.1500       5.7       290       211        77
IR     2025250    200200   17.5300  145.0500       4.6       290       212        77
IR     2025250    200200   17.4600  144.9900       8.3       294       243        72
IR     2025250    200200   17.4500  144.8400       6.6       285       245        72
IR     2025250    200200   17.4500  144.7600       6.0       277       248        70
IR     2025250    200200   17.4900  144.6700       5.3       264       251        60
IR     2025250    200200   17.5300  144.6300       4.4       255       248        69
IR     2025250    200200   17.5100  144.1100      15.3       180       277        94
IR     2025250    200200   17.4900  144.0700      16.1       180       280        96
IR     2025250    200200   17.5100  143.9700      14.6       182       274        95
IR     2025250    200200   17.4900  143.8200       9.9       184       269        89
IR     2025250    200200   17.4500  143.8000       9.1       186       272        89
IR     2025250    200200   17.4900  143.6200       8.3       181       265        90
IR     2025250    200200   17.4600  143.5300       8.2       180       277        81
IR     2025250    200200   17.4500  143.5100       8.3       180       278        83
IR     2025250    200200   17.4600  143.3300       9.4       172       269        73
IR     2025250    200200   17.4600  143.3000       9.2       173       259        74
IR     2025250    200200   17.4400  142.8000       6.8       160       350        89
IR     2025250    200200   17.4200  147.7300      11.2        41       840        91
IR     2025250    200200   17.4000  147.6900      10.5        42       820        87
IR     2025250    200200   17.4600  147.5400       6.5        43       778        83
IR     2025250    200200   17.3800  147.4800       5.0        44       714        85
IR     2025250    200200   17.4200  147.2400       4.7        39       570        86
IR     2025250    200200   17.4500  146.7600       5.4        10       426        68
IR     2025250    200200   17.4300  146.7000       5.4         2       387        76
IR     2025250    200200   17.3900  146.6200       5.3       351       374        71
IR     2025250    200200   17.4500  146.4700       5.3       343       347        62
IR     2025250    200200   17.4100  146.4000       6.5       337       353        74
IR     2025250    200200   17.3700  146.2700       6.5       345       346        73
IR     2025250    200200   17.3900  146.2500       6.3       354       338        77
IR     2025250    200200   17.4200  146.0800       5.8         7       291        84
IR     2025250    200200   17.4200  146.0400       5.7         1       282        85
IR     2025250    200200   17.3800  145.8800       4.9       335       272        85
IR     2025250    200200   17.4000  145.8000       4.4       345       259        82
IR     2025250    200200   17.4200  145.7100       4.2       333       236        74
IR     2025250    200200   17.4200  145.6300       4.9       318       229        63
IR     2025250    200200   17.4200  145.5300       6.1       299       229        77
IR     2025250    200200   17.3600  145.3900       8.5       289       236        83
IR     2025250    200200   17.4400  145.3000       8.7       286       226        91
IR     2025250    200200   17.4400  145.0300       8.3       293       244        69
IR     2025250    200200   17.4400  145.0100       8.5       294       244        69
IR     2025250    200200   17.4100  144.2400      10.5       188       278        75
IR     2025250    200200   17.3500  144.2000      10.7       185       282        86
IR     2025250    200200   17.4100  144.0600      14.1       182       282        93
IR     2025250    200200   17.4300  144.0100      14.1       184       281        94
IR     2025250    200200   17.4300  143.8700      10.7       185       276        90
IR     2025250    200200   17.3900  143.7300       8.4       187       269        88
IR     2025250    200200   17.3500  143.6900       8.5       186       266        90
IR     2025250    200200   17.4200  143.2200       9.2       169       245        83
IR     2025250    200200   17.3800  143.1200       7.3       167       255        80
IR     2025250    200200   17.4200  143.0800       7.1       169       263        72
IR     2025250    200200   17.3400  147.5900       8.5        45       796        81
IR     2025250    200200   17.3600  147.4500       4.7        44       697        90
IR     2025250    200200   17.2800  147.3700       4.1        39       598        69
IR     2025250    200200   17.2900  146.6700       4.3       356       444        84
IR     2025250    200200   17.3300  146.6300       5.0       351       405        72
IR     2025250    200200   17.2700  146.5300       5.8       333       396        83
IR     2025250    200200   17.3500  146.3800       7.2       330       366        78
IR     2025250    200200   17.3500  146.2800       6.8       337       354        73
IR     2025250    200200   17.2700  146.1800       6.3       320       351        73
IR     2025250    200200   17.2700  146.1200       5.3       321       328        78
IR     2025250    200200   17.2700  146.0700       4.9       319       315        84
IR     2025250    200200   17.2900  145.7200       6.5       307       261        71
IR     2025250    200200   17.2800  145.6800       7.4       301       255        72
IR     2025250    200200   17.2800  145.6000       9.2       294       249        79
IR     2025250    200200   17.2600  145.4800      11.3       284       249        86
IR     2025250    200200   17.2800  145.3300      10.2       282       248        89
IR     2025250    200200   17.3000  145.3100      10.0       282       246        89
IR     2025250    200200   17.2800  145.1800      10.1       289       246        82
IR     2025250    200200   17.2600  145.0600       9.6       292       249        74
IR     2025250    200200   17.3200  144.9800       9.2       289       248        72
IR     2025250    200200   17.3200  144.9100       7.8       281       254        76
IR     2025250    200200   17.2800  144.7500       5.1       256       285        80
IR     2025250    200200   17.3300  144.2100      10.2       185       280        86
IR     2025250    200200   17.2500  144.1100       8.3       189       280        87
IR     2025250    200200   17.2500  144.0000       8.2       187       280        82
IR     2025250    200200   17.2500  143.9200       8.9       193       277        82
IR     2025250    200200   17.3300  143.8100       9.2       193       277        85
IR     2025250    200200   17.3300  143.6900       8.6       186       264        90
IR     2025250    200200   17.3100  143.5800       8.2       171       268        81
IR     2025250    200200   17.2900  143.5400       8.5       167       270        80
IR     2025250    200200   17.2700  143.3600       9.9       160       265        91
IR     2025250    200200   17.2500  143.3400       9.7       159       262        96
IR     2025250    200200   17.3100  143.1700       7.7       161       253        83
IR     2025250    200200   17.3300  143.1200       6.9       163       266        82
IR     2025250    200200   17.3300  143.0600       7.4       165       306        84
IR     2025250    200200   17.2500  142.8300       6.9       165       324        89
IR     2025250    200200   17.2800  142.7700       5.1       159       288        88
IR     2025250    200200   17.2600  147.5500       8.2        43       793        80
IR     2025250    200200   17.2000  147.4400       6.0        40       714        73
IR     2025250    200200   17.1800  147.4200       5.7        40       683        74
IR     2025250    200200   17.1800  146.6200       4.3       334       450        76
IR     2025250    200200   17.2500  146.5500       5.6       332       405        84
IR     2025250    200200   17.1900  146.4100       7.1       322       385        94
IR     2025250    200200   17.2500  146.3000       7.2       321       374        80
IR     2025250    200200   17.2500  146.2800       7.2       320       371        81
IR     2025250    200200   17.2500  146.1200       5.7       316       333        78
IR     2025250    200200   17.2300  145.7000       7.0       302       258        72
IR     2025250    200200   17.2100  145.6200       8.4       293       254        87
IR     2025250    200200   17.2200  145.4800      10.5       284       251        89
IR     2025250    200200   17.1700  145.4200       8.2       279       256        88
IR     2025250    200200   17.2200  145.3100       8.9       281       254        88
IR     2025250    200200   17.1600  145.1900       7.4       289       259        78
IR     2025250    200200   17.2400  145.0800       9.3       292       249        76
IR     2025250    200200   17.2000  145.0200       6.8       289       257        70
IR     2025250    200200   17.1600  144.9600       4.7       274       284        62
IR     2025250    200200   17.2400  144.8100       4.7       248       288        82
IR     2025250    200200   17.1900  144.0000       7.4       194       280        83
IR     2025250    200200   17.1600  143.9700       7.3       200       281        87
IR     2025250    200200   17.1500  143.8000       9.8       201       264        90
IR     2025250    200200   17.1500  143.7800       9.6       200       262        89
IR     2025250    200200   17.2100  143.6500       8.5       180       258        82
IR     2025250    200200   17.1700  143.5300      10.1       161       263        86
IR     2025250    200200   17.1500  143.4900      10.7       159       263        89
IR     2025250    200200   17.2300  143.3400       9.7       158       261        95
IR     2025250    200200   17.2100  143.1100       6.8       154       282        81
IR     2025250    200200   17.1500  142.8800       7.5       162       361        88
IR     2025250    200200   17.2100  142.7700       5.0       158       281        88
IR     2025250    200200   17.1500  148.0700       7.7        26       959        84
IR     2025250    200200   17.1500  148.0500       7.3        25       952        80
IR     2025250    200200   17.1100  147.9100       6.4        18       920        80
IR     2025250    200200   17.1500  147.7700       7.2        31       874        94
IR     2025250    200200   17.1700  147.7100       8.4        36       844        88
IR     2025250    200200   17.1500  147.5800       8.7        42       812        75
IR     2025250    200200   17.0900  147.5100       7.3        41       805        74
IR     2025250    200200   17.1600  147.4000       5.5        39       662        75
IR     2025250    200200   17.1600  146.4900       6.5       322       403        96
IR     2025250    200200   17.1000  146.3100       5.4       315       380        95
IR     2025250    200200   17.0800  146.2900       5.3       314       376        92
IR     2025250    200200   17.1100  146.1900       7.5       304       368        83
IR     2025250    200200   17.1300  145.7500       6.8       281       278        86
IR     2025250    200200   17.1300  145.6300       7.5       281       265        87
IR     2025250    200200   17.0700  145.4700       6.9       282       263        85
IR     2025250    200200   17.1500  145.3800       7.5       280       261        88
IR     2025250    200200   17.1500  145.3600       7.3       281       262        90
IR     2025250    200200   17.1500  145.2500       7.0       286       263        77
IR     2025250    200200   17.1400  144.3000       8.4       189       258        86
IR     2025250    200200   17.1400  144.2000       8.4       193       260        84
IR     2025250    200200   17.1200  144.1800       8.3       196       261        86
IR     2025250    200200   17.1000  144.0500       7.1       207       277        85
IR     2025250    200200   17.1400  143.9700       7.2       203       280        87
IR     2025250    200200   17.1200  143.8800       8.6       210       269        83
IR     2025250    200200   17.1300  143.7800       9.2       201       259        86
IR     2025250    200200   17.1300  143.6900       8.7       187       245        80
IR     2025250    200200   17.1300  143.5500      10.1       161       255        85
IR     2025250    200200   17.1300  143.0900       6.6       154       336        83
IR     2025250    200200   17.0500  142.9900       7.7       156       343        82
IR     2025250    200200   17.0500  142.8600       7.8       162       341        90
IR     2025250    200200   17.0700  142.7400       4.8       158       283        86
IR     2025250    200200   17.0700  142.5300       4.8       144       260        88
IR     2025250    200200   17.0700  147.9800       6.6        18       952        84
IR     2025250    200200   16.9900  147.8800       5.3        19       938        90
IR     2025250    200200   16.9900  147.8200       5.0        18       910        91
IR     2025250    200200   17.0300  147.6700       6.7        31       858        92
IR     2025250    200200   17.0100  147.6400       6.5        30       856        92
IR     2025250    200200   16.9900  147.4900       6.2        38       797        82
IR     2025250    200200   17.0700  147.3800       6.0        37       712        80
IR     2025250    200200   17.0600  147.3000       5.3        34       588        90
IR     2025250    200200   17.0300  147.2600       6.2        34       578        80
IR     2025250    200200   17.0400  146.3600       4.4       325       390        76
IR     2025250    200200   17.0200  146.2100       5.9       307       364        78
IR     2025250    200200   17.0200  146.1900       6.3       306       358        81
IR     2025250    200200   17.0300  145.8400       5.6       281       283        85
IR     2025250    200200   16.9900  145.7400       6.7       277       279        82
IR     2025250    200200   17.0100  145.6400       7.0       275       271        84
IR     2025250    200200   17.0300  145.5500       7.4       274       266        87
IR     2025250    200200   16.9700  145.4700       6.3       282       306        74
IR     2025250    200200   17.0300  145.3900       6.6       285       285        68
IR     2025250    200200   16.9700  145.2600       6.0       284       304        65
IR     2025250    200200   16.9800  144.3300       6.1       195       234        86
IR     2025250    200200   16.9600  144.1600       7.8       193       244        86
IR     2025250    200200   17.0400  144.1400       8.1       203       255        89
IR     2025250    200200   17.0400  143.9700       6.5       210       284        81
IR     2025250    200200   16.9600  143.9300       6.8       212       291        81
IR     2025250    200200   16.9600  143.8100       6.5       203       258        63
IR     2025250    200200   17.0400  143.7600       7.8       196       241        65
IR     2025250    200200   17.0000  143.6200       9.0       170       236        81
IR     2025250    200200   16.9700  142.9700       8.1       155       282        89
IR     2025250    200200   16.9500  142.8900       7.6       157       363        87
IR     2025250    200200   17.0300  142.8600       7.9       162       343        90
IR     2025250    200200   17.0300  142.5300       5.2       147       262        90
IR     2025250    200200   16.9000  148.0500       9.0         7       981        73
IR     2025250    200200   16.9300  147.9500       5.5        12       967        80
IR     2025250    200200   16.9700  147.8600       5.2        18       932        91
IR     2025250    200200   16.9500  147.8400       5.1        15       926        90
IR     2025250    200200   16.9100  147.7400       4.7        13       892        87
IR     2025250    200200   16.8900  147.5600       4.7        28       806        77
IR     2025250    200200   16.8900  147.4800       4.4        36       767        90
IR     2025250    200200   16.9300  147.3700       6.5        44       747        90
IR     2025250    200200   16.9100  147.2700       7.1        44       673        77
IR     2025250    200200   16.8900  147.2500       7.1        43       652        73
IR     2025250    200200   16.9000  145.9700       5.3       292       316        73
IR     2025250    200200   16.9000  145.9300       5.0       288       316        73
IR     2025250    200200   16.9300  145.7600       6.2       280       304        80
IR     2025250    200200   16.9200  145.7400       6.1       279       310        84
IR     2025250    200200   16.9500  145.5800       7.0       276       298        83
IR     2025250    200200   16.9500  145.4900       6.3       280       310        77
IR     2025250    200200   16.9300  145.4100       6.5       279       320        65
IR     2025250    200200   16.9500  145.2700       6.1       281       311        66
IR     2025250    200200   16.9500  145.2600       6.1       281       310        69
IR     2025250    200200   16.9500  144.7300       4.0       201       299        62
IR     2025250    200200   16.8700  144.3100       5.8       194       239        83
IR     2025250    200200   16.8800  144.1500       8.1       189       274        89
IR     2025250    200200   16.9200  144.1400       7.8       190       274        86
IR     2025250    200200   16.8800  143.9600       6.5       205       294        82
IR     2025250    200200   16.8600  143.9000       6.1       203       289        86
IR     2025250    200200   16.9400  143.4300      10.1       157       259        95
IR     2025250    200200   16.9000  143.3300       9.4       157       244        90
IR     2025250    200200   16.9200  143.0600       7.0       158       254        90
IR     2025250    200200   16.8800  142.9700       7.4       152       262        89
IR     2025250    200200   16.9400  142.8900       7.4       156       347        86
IR     2025250    200200   16.9300  142.8000       5.2       155       297        75
IR     2025250    200200   16.9300  142.5300       4.8       141       258        86
IR     2025250    200200   16.8700  147.7500       4.9         6       920        83
IR     2025250    200200   16.8700  147.6600       4.7        11       880        87
IR     2025250    200200   16.8100  147.6100       4.2        13       856        77
IR     2025250    200200   16.8700  147.4600       4.1        40       757        91
IR     2025250    200200   16.8300  147.3800       4.9        48       759        86
IR     2025250    200200   16.7900  147.3000       5.6        44       760        89
IR     2025250    200200   16.8700  147.2300       7.0        44       651        74
IR     2025250    200200   16.8100  147.0900       5.9        44       593        75
IR     2025250    200200   16.8600  146.2000       5.1       304       356        81
IR     2025250    200200   16.8600  146.1800       5.3       302       353        81
IR     2025250    200200   16.8600  146.0000       5.3       293       336        82
IR     2025250    200200   16.8200  145.9400       5.4       287       347        79
IR     2025250    200200   16.8600  145.8300       5.5       287       332        76
IR     2025250    200200   16.8600  145.7500       5.8       283       330        79
IR     2025250    200200   16.8000  145.4600       5.1       261       367        65
IR     2025250    200200   16.8500  145.4200       6.0       273       348        60
IR     2025250    200200   16.8100  145.3100       5.1       255       356        68
IR     2025250    200200   16.7700  145.1900       4.5       254       347        85
IR     2025250    200200   16.8500  144.2300       7.1       189       241        90
IR     2025250    200200   16.8100  144.0600       6.6       187       291        84
IR     2025250    200200   16.7800  143.1300       7.3       154       248        92
IR     2025250    200200   16.7800  147.6700       5.0         8       931        65
IR     2025250    200200   16.7800  147.5700       4.1        21       833        65
IR     2025250    200200   16.7600  147.5500       4.0        24       829        64
IR     2025250    200200   16.7500  147.3200       4.8        42       803        77
IR     2025250    200200   16.7300  147.0800       5.3        42       603        83
IR     2025250    200200   16.7100  147.0600       4.8        42       600        84
IR     2025250    200200   16.7400  146.1300       4.3       288       385        80
IR     2025250    200200   16.7200  146.0700       4.1       283       374        76
IR     2025250    200200   16.7600  145.8200       5.7       284       359        76
IR     2025250    200200   16.7600  145.8000       5.8       284       360        78
IR     2025250    200200   16.7000  145.4500       4.5       238       386        83
IR     2025250    200200   16.7200  145.4000       4.4       235       381        82
IR     2025250    200200   16.7600  145.1700       4.0       254       343        84
IR     2025250    200200   16.7300  144.3400       6.0       202       282        89
IR     2025250    200200   16.6700  144.0700       4.8       197       282        72
IR     2025250    200200   16.6700  144.0300       4.4       196       271        73
IR     2025250    200200   16.6700  143.8800       5.7       172       234        78
IR     2025250    200200   16.6900  143.8600       5.9       174       234        82
IR     2025250    200200   16.7300  143.7600       6.7       173       233        89
IR     2025250    200200   16.6900  143.6100       8.0       165       252        82
IR     2025250    200200   16.7400  143.5700       8.2       165       262        86
IR     2025250    200200   16.6700  143.2300       7.2       153       242        91
IR     2025250    200200   16.7200  143.1900       7.7       156       244        94
IR     2025250    200200   16.6400  147.6600       5.9        14       967        60
IR     2025250    200200   16.6000  147.3100       4.4        28       864        60
IR     2025250    200200   16.6000  147.2300       4.4        28       817        61
IR     2025250    200200   16.6600  145.8000       4.3       271       396        90
IR     2025250    200200   16.5800  145.5600       4.6       244       428        84
IR     2025250    200200   16.5800  144.4700       4.8       203       325        80
IR     2025250    200200   16.5800  144.4100       6.4       203       319        81
IR     2025250    200200   16.6500  143.8400       6.2       166       230        80
IR     2025250    200200   16.6500  143.7400       7.6       164       237        87
IR     2025250    200200   16.6500  143.6100       8.0       166       250        80
IR     2025250    200200   16.6500  143.5500       7.9       165       252        77
IR     2025250    200200   16.5700  143.3700       6.7       154       232        88
IR     2025250    200200   16.6500  143.3400       7.6       153       236        86
IR     2025250    200200   16.6500  143.2200       6.8       151       238        94
IR     2025250    200200   16.6100  143.1500       5.3       146       229        88
IR     2025250    200200   16.5400  147.6900       6.9        16       980        82
IR     2025250    200200   16.5000  147.6500       6.7        13       982        83
IR     2025250    200200   16.5600  147.5000       5.6        17       962        65
IR     2025250    200200   16.5400  147.1900       4.1        15       820        61
IR     2025250    200200   16.5100  145.5400       4.5       248       414        86
IR     2025250    200200   16.5400  144.7900       4.8       215       377        77
IR     2025250    200200   16.5600  144.7500       4.7       217       361        76
IR     2025250    200200   16.5600  144.6800       4.1       224       349        84
IR     2025250    200200   16.5400  144.5000       4.2       198       333        85
IR     2025250    200200   16.5600  144.4900       4.4       201       329        84
IR     2025250    200200   16.5500  144.2200       5.8       204       295        75
IR     2025250    200200   16.4900  143.4100       6.3       153       229        86
IR     2025250    200200   16.5100  143.1000       4.2       139       222        84
IR     2025250    200200   16.4800  147.3200       4.9         8       928        67
IR     2025250    200200   16.4000  146.9800       4.0       339       866        72
IR     2025250    200200   16.3900  145.5100       4.4       253       379        83
IR     2025250    200200   16.4100  145.3800       5.1       227       375        77
IR     2025250    200200   16.4100  145.3000       4.9       225       376        67
IR     2025250    200200   16.4500  145.2700       4.3       227       378        69
IR     2025250    200200   16.3800  144.8000       4.2       206       350        83
IR     2025250    200200   16.3800  144.7800       4.4       207       353        84
IR     2025250    200200   16.4000  144.5900       4.0       203       318        75
IR     2025250    200200   16.4200  144.5000       4.1       185       285        66
IR     2025250    200200   16.3800  144.3200       5.6       193       283        62
IR     2025250    200200   16.3800  144.3000       5.6       193       282        62
IR     2025250    200200   16.4400  143.9600       4.2       152       220        66
IR     2025250    200200   16.4400  143.9400       4.8       153       221        67
IR     2025250    200200   16.4000  143.8100       6.9       166       251        81
IR     2025250    200200   16.4100  143.3700       4.8       147       222        84
IR     2025250    200200   16.3900  147.3500       6.0        12       965        68
IR     2025250    200200   16.3800  147.1200       4.5       353       887        62
IR     2025250    200200   16.3600  147.0200       4.3       347       894        79
IR     2025250    200200   16.3800  147.0000       4.2       345       887        77
IR     2025250    200200   16.3000  145.9100       5.4       294       803        95
IR     2025250    200200   16.3500  145.5700       4.2       257       372        86
IR     2025250    200200   16.3500  145.5100       4.5       256       373        85
IR     2025250    200200   16.3500  145.3600       4.9       232       365        71
IR     2025250    200200   16.3300  145.3200       4.6       229       362        65
IR     2025250    200200   16.3400  144.3600       5.2       192       278        75
IR     2025250    200200   16.3600  144.3200       5.4       194       279        63
IR     2025250    200200   16.3200  143.8400       6.1       176       259        77
IR     2025250    200200   16.3000  143.7100       4.9       178       272        85
IR     2025250    200200   16.3000  143.6900       4.5       178       271        80
IR     2025250    200200   16.3600  143.4000       4.4       153       217        80
IR     2025250    200200   16.2100  147.1500       4.4       351       955        72
IR     2025250    200200   16.2800  146.2400       4.0       292       808        63
IR     2025250    200200   16.2000  146.1800       4.5       295       797        82
IR     2025250    200200   16.2800  146.0100       5.0       293       794        94
IR     2025250    200200   16.1800  143.8600       4.9       187       268        78
IR     2025250    200200   16.1300  148.8700       6.5        25       921        65
IR     2025250    200200   16.1700  148.8500       6.3        23       916        65
IR     2025250    200200   16.1800  146.3900       4.7       298       884        66
IR     2025250    200200   16.1800  146.3300       4.5       298       851        70
IR     2025250    200200   16.1000  146.1900       5.2       279       856        93
IR     2025250    200200   16.1200  146.1400       4.9       280       825        96
IR     2025250    200200   16.1200  145.9600       4.0       281       816        75
IR     2025250    200200   16.1100  148.8700       6.5        25       921        65
IR     2025250    200200   16.0900  146.4400       4.0       309       932        62
IR     2025250    200200   16.0900  146.2500       4.7       283       909        85
IR     2025250    200200   16.0800  146.2100       5.2       279       874        93
IR     2025250    200200   16.0700  144.1200       4.0       194       255        76
IR     2025250    200200   15.9900  144.0400       4.0       198       280        85
IR     2025250    200200   15.9300  142.9100       4.8       122       255        76
IR     2025250    200200   15.8400  148.6600       5.5        35       906        66
IR     2025250    200200   15.8400  148.5600       6.8        45       838        69
IR     2025250    200200   15.8200  148.6900       4.6        30       914        64
IR     2025250    200200   15.8200  148.6300       5.7        35       905        67
IR     2025250    200200   15.8000  148.5600       6.7        43       843        70
IR     2025250    200200   15.5100  144.5000       4.6       144       346        72
IR     2025250    200200   15.5500  144.4000       4.4       141       299        79
IR     2025250    200200   15.5100  143.7900       4.8       130       182        82
IR     2025250    200200   15.5100  143.5800       4.5       140       182        85
IR     2025250    200200   15.4700  144.3800       4.4       136       270        66
IR     2025250    200200   15.3700  143.5400       4.2       112       183        77
IR     2025250    200200   15.3200  143.5200       4.3        96       183        91
IR     2025250    200200   15.3000  143.5200       4.3        93       183        94
IR     2025250    200200   15.2100  144.5200       4.4       110       231        81
IR     2025250    200200   15.0500  144.7800       5.3       134       230        69
IR     2025250    200200   15.0000  144.8700       5.6       131       230        66
IR     2025250    200200   15.0100  143.9800       5.6        65       191        89
IR     2025250    200200   14.9700  143.8600       6.1        66       187        90
IR     2025250    200200   14.9500  143.8400       5.8        67       187        91
IR     2025250    200200   14.8400  143.9200       6.2        72       191        87
IR     2025250    200200   14.9100  143.8200       5.3        67       187        92
IR     2025250    200200   14.7500  144.3500       6.3        90       231        65
IR     2025250    200200   14.8200  143.9200       6.1        74       191        88
IR     2025250    200200   14.7800  143.8400       4.3        83       191        93
IR     2025250    200200   14.6500  144.5200       4.5        83       231        61
IR     2025250    200200   14.7300  144.3500       6.6        88       231        62
WVCT   2025250    200200   21.0000  145.6800      13.8       153       343        64
WVCT   2025250    200200   20.9700  145.2800      10.8       145       315        88
WVCT   2025250    200200   20.8800  145.8100      13.6       165       267        85
WVCT   2025250    200200   20.9400  145.6700      14.8       154       262        73
WVCT   2025250    200200   20.8700  145.5300      15.4       139       257        85
WVCT   2025250    200200   20.8900  145.5100      14.8       139       263        86
WVCT   2025250    200200   20.8900  145.3700      13.4       136       256        90
WVCT   2025250    200200   20.9500  145.3000      11.4       143       301        86
WVCT   2025250    200200   20.8700  145.1700      13.8       141       315        85
WVCT   2025250    200200   20.8700  145.0900      12.6       153       328        78
WVCT   2025250    200200   20.8600  144.2200       9.3       194       317        63
WVCT   2025250    200200   20.8400  146.0400      14.9       151       320        61
WVCT   2025250    200200   20.8600  145.8500      13.6       167       273        82
WVCT   2025250    200200   20.8600  145.8100      13.7       166       265        86
WVCT   2025250    200200   20.7700  145.6200      13.2       151       315        81
WVCT   2025250    200200   20.8100  145.5500      15.0       140       310        82
WVCT   2025250    200200   20.8300  145.5100      15.6       138       289        84
WVCT   2025250    200200   20.7700  145.3400      16.1       136       267        81
WVCT   2025250    200200   20.7700  145.2300      17.2       130       277        73
WVCT   2025250    200200   20.7900  145.1300      14.8       145       280        80
WVCT   2025250    200200   20.8100  145.1100      14.0       149       293        74
WVCT   2025250    200200   20.7700  144.9700      13.9       153       273        89
WVCT   2025250    200200   20.7900  144.8300      14.7       142       283        86
WVCT   2025250    200200   20.7900  144.8100      14.8       141       283        86
WVCT   2025250    200200   20.8500  144.6600      13.4       150       321        76
WVCT   2025250    200200   20.8200  144.5400      13.0       167       272        84
WVCT   2025250    200200   20.8200  144.4400      11.3       187       275        86
WVCT   2025250    200200   20.8000  144.3400      10.1       184       263        84
WVCT   2025250    200200   20.8000  144.3200      10.0       184       263        78
WVCT   2025250    200200   20.8000  144.2000       9.8       171       257        94
WVCT   2025250    200200   20.8200  144.1000      12.3       230       288        69
WVCT   2025250    200200   20.7600  143.9800      13.9       236       275        77
WVCT   2025250    200200   20.7600  143.9200      11.0       224       303        62
WVCT   2025250    200200   20.7600  143.8000       8.6       187       326        65
WVCT   2025250    200200   20.6800  146.1900      15.5       148       263        91
WVCT   2025250    200200   20.7200  146.0600      14.1       162       257        79
WVCT   2025250    200200   20.7400  146.0200      13.9       165       258        68
WVCT   2025250    200200   20.7400  145.9000      13.9       170       260        68
WVCT   2025250    200200   20.7400  145.8400      14.6       164       263        86
WVCT   2025250    200200   20.7300  145.7000      13.1       158       282        75
WVCT   2025250    200200   20.6900  145.6200      12.8       152       335        75
WVCT   2025250    200200   20.6700  145.4600      15.4       142       286        76
WVCT   2025250    200200   20.6900  145.3800      16.0       139       257        89
WVCT   2025250    200200   20.6700  145.2800      17.0       135       247        86
WVCT   2025250    200200   20.6700  145.2000      17.4       136       239        83
WVCT   2025250    200200   20.7100  145.1000      15.5       145       244        91
WVCT   2025250    200200   20.7100  145.0000      14.7       152       246        94
WVCT   2025250    200200   20.7500  144.9100      14.9       146       255        93
WVCT   2025250    200200   20.7500  144.8100      14.8       147       245        92
WVCT   2025250    200200   20.6900  144.7500      13.6       159       239        94
WVCT   2025250    200200   20.6800  144.6100      13.5       168       242        77
WVCT   2025250    200200   20.7400  144.5300      13.4       171       250        70
WVCT   2025250    200200   20.7400  144.4500      12.2       184       250        81
WVCT   2025250    200200   20.7400  144.2700       9.9       171       251        92
WVCT   2025250    200200   20.7400  144.2500      10.2       161       251        93
WVCT   2025250    200200   20.7400  144.1200       9.9       186       257        91
WVCT   2025250    200200   20.7400  143.9800      13.2       232       272        81
WVCT   2025250    200200   20.6800  143.9000       9.6       179       283        88
WVCT   2025250    200200   20.6800  143.8200       9.4       167       300        75
WVCT   2025250    200200   20.6600  143.6000       7.9       215       340        70
WVCT   2025250    200200   20.5800  146.2800      15.6       147       320        83
WVCT   2025250    200200   20.5800  146.2600      15.2       148       235        89
WVCT   2025250    200200   20.6000  146.1300      14.9       157       232        87
WVCT   2025250    200200   20.6600  146.0500      14.0       163       239        89
WVCT   2025250    200200   20.5800  145.9700      13.0       156       246        88
WVCT   2025250    200200   20.6100  145.8500      13.0       152       258        84
WVCT   2025250    200200   20.5900  145.6900      14.0       144       294        82
WVCT   2025250    200200   20.5700  145.6100      15.1       136       299        82
WVCT   2025250    200200   20.6100  145.4900      16.0       133       285        74
WVCT   2025250    200200   20.5700  145.4300      16.9       137       244        90
WVCT   2025250    200200   20.6100  145.2900      17.4       138       239        87
WVCT   2025250    200200   20.6300  145.2800      17.2       137       241        86
WVCT   2025250    200200   20.6300  145.1800      16.4       142       235        85
WVCT   2025250    200200   20.6300  145.0800      14.7       149       235        89
WVCT   2025250    200200   20.5700  144.9800      14.4       152       238        93
WVCT   2025250    200200   20.5600  144.8000      14.2       141       237        89
WVCT   2025250    200200   20.5800  144.7800      13.4       148       236        92
WVCT   2025250    200200   20.5600  144.6000      11.3       167       250        95
WVCT   2025250    200200   20.5600  144.5000      10.9       173       257        90
WVCT   2025250    200200   20.6000  144.4800      11.5       171       254        83
WVCT   2025250    200200   20.5600  144.3600      10.6       172       269        74
WVCT   2025250    200200   20.5600  144.2600      10.5       182       271        76
WVCT   2025250    200200   20.5600  144.1100      12.7       232       277        79
WVCT   2025250    200200   20.5600  144.0900      13.0       235       278        80
WVCT   2025250    200200   20.6200  143.9500       8.9       198       274        85
WVCT   2025250    200200   20.6400  143.8200      10.0       156       298        80
WVCT   2025250    200200   20.6400  143.8000       9.8       158       301        78
WVCT   2025250    200200   20.5600  143.6900       7.6       185       296        64
WVCT   2025250    200200   20.5800  143.6000       8.9       215       304        82
WVCT   2025250    200200   20.5900  143.5000       7.4       204       325        82
WVCT   2025250    200200   20.5200  146.3000      16.1       149       235        81
WVCT   2025250    200200   20.5600  146.2600      15.4       148       233        88
WVCT   2025250    200200   20.5600  146.1400      14.7       155       232        86
WVCT   2025250    200200   20.5400  146.0000      12.8       154       248        88
WVCT   2025250    200200   20.5400  145.9200      11.7       153       260        73
WVCT   2025250    200200   20.4900  145.6800      15.4       139       278        62
WVCT   2025250    200200   20.5100  145.5900      15.9       136       276        87
WVCT   2025250    200200   20.5300  145.5500      16.2       136       269        88
WVCT   2025250    200200   20.5300  145.4100      16.6       141       244        90
WVCT   2025250    200200   20.5500  145.3500      17.2       140       241        87
WVCT   2025250    200200   20.5100  145.1500      14.8       165       250        86
WVCT   2025250    200200   20.4700  144.9900      12.9       147       258        84
WVCT   2025250    200200   20.4700  144.9700      13.2       142       254        77
WVCT   2025250    200200   20.5000  144.6900      13.2       136       280        74
WVCT   2025250    200200   20.5000  144.6800      12.2       144       282        68
WVCT   2025250    200200   20.5200  144.5600      11.2       166       259        93
WVCT   2025250    200200   20.5400  144.4000      10.9       164       266        84
WVCT   2025250    200200   20.5400  144.3600      10.6       171       269        80
WVCT   2025250    200200   20.4600  144.2200      10.9       182       275        77
WVCT   2025250    200200   20.5200  144.1200      12.8       230       275        79
WVCT   2025250    200200   20.5200  143.9900      11.7       233       280        66
WVCT   2025250    200200   20.5400  143.8100       9.9       154       278        73
WVCT   2025250    200200   20.5400  143.7300       7.8       169       281        67
WVCT   2025250    200200   20.5400  143.6100       7.4       206       298        76
WVCT   2025250    200200   20.4700  143.4300       7.7       192       300        82
WVCT   2025250    200200   20.3800  146.4100      15.2       152       324        79
WVCT   2025250    200200   20.4200  146.3700      15.0       151       263        60
WVCT   2025250    200200   20.4200  146.0300      10.6       151       315        79
WVCT   2025250    200200   20.3700  145.9100      12.0       145       301        77
WVCT   2025250    200200   20.3700  145.8900      12.2       146       298        77
WVCT   2025250    200200   20.3700  145.7500      14.1       147       280        72
WVCT   2025250    200200   20.4300  145.6800      15.4       142       269        65
WVCT   2025250    200200   20.4100  145.1400      13.1       159       270        88
WVCT   2025250    200200   20.4100  145.0200      11.1       160       271        92
WVCT   2025250    200200   20.4400  144.2200      10.9       176       280        67
WVCT   2025250    200200   20.4200  144.0400      11.0       217       250        77
WVCT   2025250    200200   20.4200  144.0200      11.5       220       252        76
WVCT   2025250    200200   20.3600  143.9200      11.4       205       249        81
WVCT   2025250    200200   20.3800  143.7800      10.2       198       268        74
WVCT   2025250    200200   20.4000  143.6600       7.4       185       277        86
WVCT   2025250    200200   20.4300  143.6100       6.3       181       284        73
WVCT   2025250    200200   20.4100  143.5100       6.7       190       286        84
WVCT   2025250    200200   20.4100  143.4300       7.1       187       295        83
WVCT   2025250    200200   20.3900  143.3300       6.7       187       326        61
WVCT   2025250    200200   20.3500  143.0500       4.2       201       346        75
WVCT   2025250    200200   20.3000  146.4600      14.9       151       336        79
WVCT   2025250    200200   20.3600  146.4300      15.2       151       332        80
WVCT   2025250    200200   20.3600  146.1500      10.0       155       317        65
WVCT   2025250    200200   20.3600  146.0700      10.8       148       321        83
WVCT   2025250    200200   20.2700  145.9700      13.7       147       292        82
WVCT   2025250    200200   20.3500  145.9100      12.1       146       301        75
WVCT   2025250    200200   20.2700  145.7500      14.8       147       272        88
WVCT   2025250    200200   20.2700  145.6500      15.7       139       266        78
WVCT   2025250    200200   20.3100  145.5700      15.6       150       258        61
WVCT   2025250    200200   20.2700  145.4900      15.8       153       257        74
WVCT   2025250    200200   20.3300  145.2600      13.7       142       267        73
WVCT   2025250    200200   20.3300  145.2400      13.4       142       268        75
WVCT   2025250    200200   20.3300  145.0800      11.3       143       271        80
WVCT   2025250    200200   20.2900  145.0200      10.7       139       268        81
WVCT   2025250    200200   20.2800  144.8600      12.7       133       269        67
WVCT   2025250    200200   20.3400  144.6300      12.8       142       264        79
WVCT   2025250    200200   20.3400  144.5500      12.3       146       263        80
WVCT   2025250    200200   20.2800  144.3900      10.0       141       262        80
WVCT   2025250    200200   20.3000  144.2900       9.4       153       265        81
WVCT   2025250    200200   20.3200  144.1700       9.9       163       268        82
WVCT   2025250    200200   20.3200  144.1500       9.9       167       270        81
WVCT   2025250    200200   20.2800  143.9900      11.6       196       256        74
WVCT   2025250    200200   20.3200  143.9200      12.0       203       241        83
WVCT   2025250    200200   20.3400  143.7800      11.0       203       261        83
WVCT   2025250    200200   20.2800  143.7600      11.9       201       243        86
WVCT   2025250    200200   20.2500  143.6600      11.2       206       259        83
WVCT   2025250    200200   20.2500  143.5000       7.4       198       277        70
WVCT   2025250    200200   20.2500  143.4600       6.5       193       281        78
WVCT   2025250    200200   20.3300  143.0900       6.0       208       345        79
WVCT   2025250    200200   20.2700  142.9900       5.5       191       339        80
WVCT   2025250    200200   20.2500  142.9700       5.8       187       339        79
WVCT   2025250    200200   20.2000  146.5300      15.1       147       348        82
WVCT   2025250    200200   20.2200  146.5200      14.6       150       345        78
WVCT   2025250    200200   20.2400  146.2600      11.5       154       328        71
WVCT   2025250    200200   20.2400  146.1600      10.7       148       324        83
WVCT   2025250    200200   20.1700  146.0600      14.0       149       290        81
WVCT   2025250    200200   20.2100  146.0000      14.4       148       284        84
WVCT   2025250    200200   20.1900  145.8400      14.6       135       273        74
WVCT   2025250    200200   20.1900  145.8200      14.8       134       272        74
WVCT   2025250    200200   20.2100  145.7200      15.5       133       275        72
WVCT   2025250    200200   20.1700  145.6200      15.6       126       264        66
WVCT   2025250    200200   20.2500  145.4900      15.5       151       257        70
WVCT   2025250    200200   20.2500  145.3500      15.9       140       258        69
WVCT   2025250    200200   20.2500  145.3300      15.8       138       259        72
WVCT   2025250    200200   20.2500  145.1700      11.5       135       266        60
WVCT   2025250    200200   20.2100  145.1300      10.2       136       265        73
WVCT   2025250    200200   20.2300  144.9900      10.1       140       263        80
WVCT   2025250    200200   20.2000  144.8900      12.2       141       265        73
WVCT   2025250    200200   20.2400  144.8400      12.2       140       267        74
WVCT   2025250    200200   20.2400  144.6200      10.9       155       252        68
WVCT   2025250    200200   20.2400  144.4600       8.6       148       249        90
WVCT   2025250    200200   20.2400  144.3600       9.0       140       252        90
WVCT   2025250    200200   20.1600  144.3000       8.4       151       244        94
WVCT   2025250    200200   20.1800  144.2400       8.2       161       248        91
WVCT   2025250    200200   20.2200  144.1500       8.3       174       258        84
WVCT   2025250    200200   20.2400  143.9700      11.4       196       255        71
WVCT   2025250    200200   20.2400  143.9500      11.5       198       252        72
WVCT   2025250    200200   20.1800  143.8100      11.9       197       240        79
WVCT   2025250    200200   20.2400  143.7400      12.2       200       237        85
WVCT   2025250    200200   20.1900  143.5800      11.0       208       251        76
WVCT   2025250    200200   20.1500  143.5300      10.8       210       253        73
WVCT   2025250    200200   20.1700  143.4200       7.5       203       282        75
WVCT   2025250    200200   20.1900  143.0300       7.8       202       330        63
WVCT   2025250    200200   20.1500  142.9100       5.5       182       343        64
WVCT   2025250    200200   20.1000  146.5700      15.7       150       343        73
WVCT   2025250    200200   20.1200  146.5500      15.0       151       343        73
WVCT   2025250    200200   20.0800  146.3100      13.2       160       332        68
WVCT   2025250    200200   20.0800  146.2300      13.9       150       320        81
WVCT   2025250    200200   20.1000  146.1100      13.6       145       290        82
WVCT   2025250    200200   20.1500  146.0600      14.1       149       284        81
WVCT   2025250    200200   20.0900  145.9100      15.0       137       267        85
WVCT   2025250    200200   20.1500  145.8200      15.3       129       273        72
WVCT   2025250    200200   20.1300  145.6800      16.9       123       263        64
WVCT   2025250    200200   20.1300  145.6600      16.8       122       262        64
WVCT   2025250    200200   20.0700  145.4800      13.8       126       257        83
WVCT   2025250    200200   20.0700  145.4600      13.3       128       257        88
WVCT   2025250    200200   20.0900  145.2800       9.3       148       260        74
WVCT   2025250    200200   20.0700  145.2000      11.5       129       259        96
WVCT   2025250    200200   20.0700  145.1200      15.0       119       252        88
WVCT   2025250    200200   20.0900  145.0600      13.8       122       254        92
WVCT   2025250    200200   20.1000  144.9700      11.2       143       257        83
WVCT   2025250    200200   20.1200  144.8700      11.3       148       261        81
WVCT   2025250    200200   20.0600  144.6900      11.0       142       259        79
WVCT   2025250    200200   20.1200  144.6700       9.9       152       260        90
WVCT   2025250    200200   20.1200  144.5000       8.5       163       250        89
WVCT   2025250    200200   20.1200  144.4600       8.0       161       246        90
WVCT   2025250    200200   20.1400  144.3000       8.8       152       243        94
WVCT   2025250    200200   20.1400  144.2600       8.6       160       243        91
WVCT   2025250    200200   20.1000  144.1600       8.5       177       240        87
WVCT   2025250    200200   20.1000  144.0400       8.2       175       240        89
WVCT   2025250    200200   20.0600  143.9200       7.8       176       239        89
WVCT   2025250    200200   20.0600  143.8400       8.6       183       249        87
WVCT   2025250    200200   20.1100  143.7100      12.7       210       240        82
WVCT   2025250    200200   20.0900  143.6900      12.7       214       248        83
WVCT   2025250    200200   20.1300  143.5100      10.5       211       253        75
WVCT   2025250    200200   20.1100  143.4900      10.2       211       249        78
WVCT   2025250    200200   20.0700  143.3300       7.3       205       291        85
WVCT   2025250    200200   20.0700  143.2400       6.5       203       305        80
WVCT   2025250    200200   20.1100  143.2000       7.0       207       310        79
WVCT   2025250    200200   20.0500  143.0800       7.8       203       312        83
WVCT   2025250    200200   20.1100  142.9800       7.2       194       327        70
WVCT   2025250    200200   20.0500  142.8400       4.8       192       320        64
WVCT   2025250    200200   19.9800  146.7200      17.9       149       349        69
WVCT   2025250    200200   20.0200  146.6200      17.2       151       336        73
WVCT   2025250    200200   20.0000  146.5800      16.0       153       334        72
WVCT   2025250    200200   20.0400  146.4400      12.0       159       339        65
WVCT   2025250    200200   20.0400  146.3200      12.2       157       333        60
WVCT   2025250    200200   20.0200  146.2400      13.3       149       320        81
WVCT   2025250    200200   20.0600  146.1100      14.2       144       277        85
WVCT   2025250    200200   19.9700  146.0000      15.2       145       271        80
WVCT   2025250    200200   19.9700  145.9800      15.0       145       270        77
WVCT   2025250    200200   20.0500  145.8100      16.3       121       255        78
WVCT   2025250    200200   20.0500  145.7700      17.0       118       250        77
WVCT   2025250    200200   19.9700  145.6300      16.5       114       248        74
WVCT   2025250    200200   20.0300  145.5500      16.1       114       256        74
WVCT   2025250    200200   19.9700  145.4700      16.0       124       257        86
WVCT   2025250    200200   19.9700  145.3300      11.2       143       256        89
WVCT   2025250    200200   20.0500  145.2400       9.7       139       258        81
WVCT   2025250    200200   19.9900  145.1400      18.5       107       251        78
WVCT   2025250    200200   19.9900  145.1000      20.4       103       250        76
WVCT   2025250    200200   19.9900  145.0000      18.4       108       249        79
WVCT   2025250    200200   19.9600  144.8200      13.0       131       253        87
WVCT   2025250    200200   19.9600  144.7200      15.5       122       249        83
WVCT   2025250    200200   19.9600  144.6800      16.3       121       249        78
WVCT   2025250    200200   19.9800  144.6100      13.4       131       255        78
WVCT   2025250    200200   19.9800  144.5100      12.6       141       244        84
WVCT   2025250    200200   20.0000  144.3300      11.2       158       235        86
WVCT   2025250    200200   20.0200  144.3100      10.8       159       236        89
WVCT   2025250    200200   19.9600  144.1700      10.0       166       237        93
WVCT   2025250    200200   19.9800  144.0400       8.1       182       232        87
WVCT   2025250    200200   19.9600  143.9400       7.5       179       230        86
WVCT   2025250    200200   19.9800  143.8600       7.6       174       238        79
WVCT   2025250    200200   20.0300  143.6500      11.9       218       257        63
WVCT   2025250    200200   19.9500  143.5400      10.1       210       268        69
WVCT   2025250    200200   19.9500  143.5200       9.9       206       256        74
WVCT   2025250    200200   19.9500  143.3500       8.1       194       255        85
WVCT   2025250    200200   19.9500  143.3300       7.9       197       260        82
WVCT   2025250    200200   20.0100  143.1900       7.2       208       307        83
WVCT   2025250    200200   19.9900  143.0600       7.1       199       297        84
WVCT   2025250    200200   19.9700  143.0400       6.8       196       292        84
WVCT   2025250    200200   20.0300  142.9000       6.0       193       300        72
WVCT   2025250    200200   19.9900  142.8400       5.6       197       275        86
WVCT   2025250    200200   19.9900  142.5900       4.1       170       344        75
WVCT   2025250    200200   19.9000  146.6900      16.1       149       333        79
WVCT   2025250    200200   19.9000  146.6700      16.0       150       333        78
WVCT   2025250    200200   19.8800  146.5100      11.4       154       332        74
WVCT   2025250    200200   19.8800  146.1900      15.3       139       275        83
WVCT   2025250    200200   19.8800  146.1700      15.6       138       274        82
WVCT   2025250    200200   19.9500  146.0200      15.4       144       274        84
WVCT   2025250    200200   19.9500  145.9400      14.8       146       265        74
WVCT   2025250    200200   19.9500  145.8600      14.6       133       248        82
WVCT   2025250    200200   19.8700  145.7400      17.5        95       237        76
WVCT   2025250    200200   19.9500  145.6500      16.7       110       245        65
WVCT   2025250    200200   19.8700  145.5000      15.4       124       258        88
WVCT   2025250    200200   19.8900  145.4900      15.9       124       258        85
WVCT   2025250    200200   19.9100  145.3100      11.9       134       255        88
WVCT   2025250    200200   19.8700  145.2100      15.2       105       253        71
WVCT   2025250    200200   19.8700  145.1100      21.7        92       247        82
WVCT   2025250    200200   19.9100  145.0100      23.1        97       244        77
WVCT   2025250    200200   19.9200  144.9800      19.3       104       247        81
WVCT   2025250    200200   19.9200  144.8200      14.2       127       247        89
WVCT   2025250    200200   19.8600  144.7200      17.3       116       231        62
WVCT   2025250    200200   19.9000  144.5200      13.5       134       230        75
WVCT   2025250    200200   19.9000  144.4800      12.2       143       230        91
WVCT   2025250    200200   19.9400  144.3300      11.7       159       231        78
WVCT   2025250    200200   19.9400  144.2900      11.5       159       232        80
WVCT   2025250    200200   19.8600  144.1700      10.1       174       229        91
WVCT   2025250    200200   19.9200  144.0300       8.4       183       235        87
WVCT   2025250    200200   19.9400  143.9900       8.1       181       231        88
WVCT   2025250    200200   19.8600  143.8300       8.3       186       246        83
WVCT   2025250    200200   19.8800  143.7900       7.6       191       250        62
WVCT   2025250    200200   19.9100  143.6400       9.3       216       292        74
WVCT   2025250    200200   19.9300  143.5400       9.8       208       279        74
WVCT   2025250    200200   19.9300  143.5000       9.5       203       259        82
WVCT   2025250    200200   19.8500  143.4200       8.6       197       264        78
WVCT   2025250    200200   19.9300  143.2900       7.6       203       275        79
WVCT   2025250    200200   19.8500  143.2300       8.2       216       276        81
WVCT   2025250    200200   19.9300  143.1100       7.1       207       296        77
WVCT   2025250    200200   19.8900  142.9700       6.2       194       281        87
WVCT   2025250    200200   19.8500  142.8600       6.4       202       264        69
WVCT   2025250    200200   19.9300  142.8400       6.2       201       261        85
WVCT   2025250    200200   19.7800  146.8200      17.1       160       341        60
WVCT   2025250    200200   19.7800  146.7400      14.0       149       315        77
WVCT   2025250    200200   19.8400  146.5900      12.6       153       330        70
WVCT   2025250    200200   19.8000  146.5300      10.4       151       332        79
WVCT   2025250    200200   19.7800  146.4100       9.8       142       327        66
WVCT   2025250    200200   19.7800  146.3300      11.8       137       292        80
WVCT   2025250    200200   19.8600  146.2100      15.5       139       275        82
WVCT   2025250    200200   19.8600  146.1500      15.9       138       271        82
WVCT   2025250    200200   19.7700  146.0700      13.3       138       271        82
WVCT   2025250    200200   19.7700  145.9700      12.4       141       243        87
WVCT   2025250    200200   19.7900  145.8300      14.7       124       234        89
WVCT   2025250    200200   19.8500  145.7600      17.0        98       237        76
WVCT   2025250    200200   19.7700  145.6700      13.1       111       237        82
WVCT   2025250    200200   19.8500  145.5200      15.1       125       257        87
WVCT   2025250    200200   19.7900  145.4800      14.2       127       254        93
WVCT   2025250    200200   19.8100  145.3600      13.5       126       251        91
WVCT   2025250    200200   19.8500  145.2100      15.2       104       250        73
WVCT   2025250    200200   19.8500  145.1100      21.1        92       244        81
WVCT   2025250    200200   19.8500  145.0300      21.8        95       238        80
WVCT   2025250    200200   19.8300  144.9900      18.2       103       236        80
WVCT   2025250    200200   19.8000  144.8700      12.5       129       232        84
WVCT   2025250    200200   19.8400  144.7700      14.9       120       231        79
WVCT   2025250    200200   19.7600  144.6500      13.4       126       224        64
WVCT   2025250    200200   19.7600  144.5100      11.2       145       225        73
WVCT   2025250    200200   19.7600  144.4200      10.6       149       229        86
WVCT   2025250    200200   19.8400  144.3200      11.0       161       230        73
WVCT   2025250    200200   19.8200  144.2200      10.5       173       227        80
WVCT   2025250    200200   19.8400  144.2000      10.4       173       227        88
WVCT   2025250    200200   19.8000  144.0800       9.3       192       224        83
WVCT   2025250    200200   19.7600  143.9700       9.6       184       233        84
WVCT   2025250    200200   19.8200  143.8500       9.0       184       244        85
WVCT   2025250    200200   19.8200  143.7500       8.4       197       253        74
WVCT   2025250    200200   19.7700  143.6300      10.0       218       258        66
WVCT   2025250    200200   19.7700  143.6100      10.3       220       258        67
WVCT   2025250    200200   19.7900  143.4400       9.5       213       290        67
WVCT   2025250    200200   19.7900  143.3800       9.2       210       272        73
WVCT   2025250    200200   19.8100  143.3200       8.7       208       261        79
WVCT   2025250    200200   19.7900  143.2000       7.7       217       289        73
WVCT   2025250    200200   19.7700  143.1200       6.7       212       294        81
WVCT   2025250    200200   19.7700  143.0300       6.6       201       287        73
WVCT   2025250    200200   19.8300  142.8500       6.4       203       266        66
WVCT   2025250    200200   19.8100  142.7900       6.2       200       264        68
WVCT   2025250    200200   19.7900  142.7000       4.7       176       288        81
WVCT   2025250    200200   19.7600  146.8200      16.8       160       332        61
WVCT   2025250    200200   19.7600  146.7800      15.7       157       321        71
WVCT   2025250    200200   19.7200  146.6800      11.4       144       332        63
WVCT   2025250    200200   19.7000  146.6000      10.9       145       337        78
WVCT   2025250    200200   19.7600  146.4400       9.3       143       329        65
WVCT   2025250    200200   19.7600  146.3200      11.5       137       286        82
WVCT   2025250    200200   19.7200  146.2200      14.2       139       266        83
WVCT   2025250    200200   19.7400  146.2000      15.3       139       264        72
WVCT   2025250    200200   19.7200  146.1000      13.2       138       259        72
WVCT   2025250    200200   19.7300  145.9900      11.1       136       237        68
WVCT   2025250    200200   19.7500  145.8700      14.0       131       227        85
WVCT   2025250    200200   19.7100  145.7500      13.9       129       224        88
WVCT   2025250    200200   19.7500  145.6700      12.5       115       235        78
WVCT   2025250    200200   19.7500  145.5900      12.5       123       244        79
WVCT   2025250    200200   19.6900  145.4300      15.2       109       240        89
WVCT   2025250    200200   19.7100  145.4100      15.3       113       242        89
WVCT   2025250    200200   19.6700  145.2900      15.0       121       231        95
WVCT   2025250    200200   19.6900  145.1600      16.4       124       231        79
WVCT   2025250    200200   19.6900  145.0600      15.4       121       233        94
WVCT   2025250    200200   19.7000  144.9400       9.9       136       232        91
WVCT   2025250    200200   19.7400  144.8500      10.0       138       227        86
WVCT   2025250    200200   19.7200  144.8300       9.6       137       227        80
WVCT   2025250    200200   19.6800  144.6500      11.1       130       230        92
WVCT   2025250    200200   19.6800  144.6300      10.5       135       230        94
WVCT   2025250    200200   19.7200  144.5300       9.9       157       228        73
WVCT   2025250    200200   19.7400  144.4300      10.3       155       229        80
WVCT   2025250    200200   19.6600  144.2500      12.3       168       233        81
WVCT   2025250    200200   19.7400  144.1600      10.1       185       226        74
WVCT   2025250    200200   19.7200  144.0600       8.7       191       225        64
WVCT   2025250    200200   19.7200  144.0400       8.8       189       226        64
WVCT   2025250    200200   19.7400  143.9400       9.7       180       233        81
WVCT   2025250    200200   19.7000  143.8100       9.1       177       236        81
WVCT   2025250    200200   19.7200  143.6700       8.6       205       241        79
WVCT   2025250    200200   19.7000  143.6500       8.2       205       239        82
WVCT   2025250    200200   19.6500  143.0800       5.7       201       300        60
WVCT   2025250    200200   19.6700  143.0400       6.4       202       292        75
WVCT   2025250    200200   19.7100  142.9500       7.2       206       288        79
WVCT   2025250    200200   19.6500  142.8100       5.7       203       288        63
WVCT   2025250    200200   19.6500  142.7100       4.5       187       280        83
WVCT   2025250    200200   19.6700  142.6700       4.4       175       284        83
WVCT   2025250    200200   19.6600  146.8500      15.9       159       318        66
WVCT   2025250    200200   19.6000  146.7500      12.2       145       324        69
WVCT   2025250    200200   19.6000  146.6700      11.4       143       338        70
WVCT   2025250    200200   19.6000  146.5100      10.6       139       322        80
WVCT   2025250    200200   19.6200  146.4300      10.0       135       298        76
WVCT   2025250    200200   19.6600  146.3600       9.0       130       281        85
WVCT   2025250    200200   19.5800  146.2700       9.7       126       259        87
WVCT   2025250    200200   19.6400  146.1200      10.6       132       246        76
WVCT   2025250    200200   19.6000  146.1000       9.3       126       234        80
WVCT   2025250    200200   19.6100  145.9400      11.6       133       216        79
WVCT   2025250    200200   19.5700  145.8600      13.6       135       213        87
WVCT   2025250    200200   19.6300  145.8000      13.8       136       217        86
WVCT   2025250    200200   19.6300  145.6500      12.7       131       224        90
WVCT   2025250    200200   19.5700  145.5600      15.5       117       224        93
WVCT   2025250    200200   19.5700  145.4500      14.0       107       225        91
WVCT   2025250    200200   19.5700  145.3900      14.2       107       225        80
WVCT   2025250    200200   19.6500  145.3100      15.1       116       231        96
WVCT   2025250    200200   19.6100  145.2100      20.6       117       230        80
WVCT   2025250    200200   19.5700  145.1100      23.7       108       231        80
WVCT   2025250    200200   19.5900  144.9900      18.7       113       235        86
WVCT   2025250    200200   19.6000  144.8400       9.5       138       233        67
WVCT   2025250    200200   19.6200  144.7600      11.1       128       233        88
WVCT   2025250    200200   19.6400  144.7200      12.9       123       233        92
WVCT   2025250    200200   19.5800  144.5600      10.2       160       242        80
WVCT   2025250    200200   19.6000  144.4500      12.1       170       238        82
WVCT   2025250    200200   19.5800  144.4300      12.2       174       238        72
WVCT   2025250    200200   19.6400  144.2500      12.6       165       234        78
WVCT   2025250    200200   19.5600  144.1700      13.1       153       231        85
WVCT   2025250    200200   19.5600  144.1300      12.2       155       231        89
WVCT   2025250    200200   19.6000  144.0200       9.6       174       228        75
WVCT   2025250    200200   19.6400  143.8800       9.9       165       228        84
WVCT   2025250    200200   19.6200  143.7800       8.5       162       230        76
WVCT   2025250    200200   19.5800  143.6600       7.1       165       237        86
WVCT   2025250    200200   19.5800  143.6200       6.8       170       239        87
WVCT   2025250    200200   19.5500  143.5100       7.5       186       247        72
WVCT   2025250    200200   19.6300  143.0800       5.7       200       301        63
WVCT   2025250    200200   19.6300  143.0600       5.9       202       296        68
WVCT   2025250    200200   19.5700  142.9600       7.3       208       297        84
WVCT   2025250    200200   19.5500  142.8400       6.4       204       300        77
WVCT   2025250    200200   19.5900  142.6900       4.2       187       287        86
WVCT   2025250    200200   19.5200  146.9000      14.9       148       330        81
WVCT   2025250    200200   19.5600  146.8400      14.0       146       320        83
WVCT   2025250    200200   19.5400  146.7800      12.8       143       321        71
WVCT   2025250    200200   19.5600  146.6900      11.4       142       338        71
WVCT   2025250    200200   19.5000  146.5400       8.9       136       322        85
WVCT   2025250    200200   19.5600  146.4700       9.9       134       301        78
WVCT   2025250    200200   19.5000  146.3300      10.6       126       257        91
WVCT   2025250    200200   19.4800  146.2900      10.5       123       253        93
WVCT   2025250    200200   19.4800  146.1900       8.0       102       238        78
WVCT   2025250    200200   19.5000  146.0500       7.6       106       217        84
WVCT   2025250    200200   19.4800  145.9900      10.2       120       212        96
WVCT   2025250    200200   19.5500  145.8800      13.7       134       212        87
WVCT   2025250    200200   19.4700  145.7100      13.9       123       212        87
WVCT   2025250    200200   19.4700  145.6700      14.5       119       211        89
WVCT   2025250    200200   19.5500  145.5600      15.7       116       223        93
WVCT   2025250    200200   19.5500  145.4800      14.7       112       223        94
WVCT   2025250    200200   19.5500  145.3700      14.3       109       225        83
WVCT   2025250    200200   19.4700  145.2200      27.3        94       225        73
WVCT   2025250    200200   19.4900  145.2000      27.8        97       229        78
WVCT   2025250    200200   19.5300  145.0300      26.4       107       235        83
WVCT   2025250    200200   19.5300  144.9900      21.8       111       235        84
WVCT   2025250    200200   19.5200  144.8300       7.5       170       228        65
WVCT   2025250    200200   19.5200  144.7900       6.9       189       230        74
WVCT   2025250    200200   19.5000  144.6600       8.7       186       234        65
WVCT   2025250    200200   19.4600  144.4600      12.1       183       225        83
WVCT   2025250    200200   19.4600  144.3800      11.7       172       224        82
WVCT   2025250    200200   19.4800  144.3000      11.9       159       229        87
WVCT   2025250    200200   19.5400  144.1500      12.7       153       230        87
WVCT   2025250    200200   19.4600  144.1100      11.5       167       225        86
WVCT   2025250    200200   19.5000  143.9500      10.3       188       229        79
WVCT   2025250    200200   19.4800  143.9100      10.3       190       231        82
WVCT   2025250    200200   19.5400  143.7600       7.6       166       233        88
WVCT   2025250    200200   19.4800  143.6600       7.6       163       240        84
WVCT   2025250    200200   19.5000  143.5800       7.7       163       246        79
WVCT   2025250    200200   19.5300  143.4800       7.6       185       249        72
WVCT   2025250    200200   19.4900  143.4400       7.9       188       256        77
WVCT   2025250    200200   19.5100  142.9200       6.6       201       313        74
WVCT   2025250    200200   19.5100  142.7800       5.4       203       302        77
WVCT   2025250    200200   19.4700  142.7600       5.2       203       311        70
WVCT   2025250    200200   19.3800  146.9300      12.9       140       315        81
WVCT   2025250    200200   19.4400  146.9000      14.2       144       315        83
WVCT   2025250    200200   19.4600  146.8000      11.5       141       321        64
WVCT   2025250    200200   19.4600  146.7000       8.8       139       335        63
WVCT   2025250    200200   19.3800  146.5500       6.4       118       303        71
WVCT   2025250    200200   19.4400  146.4800       8.9       130       280        82
WVCT   2025250    200200   19.3800  146.3400      11.7       135       255        84
WVCT   2025250    200200   19.4600  146.3200      11.3       127       256        91
WVCT   2025250    200200   19.4600  146.1700       8.1       100       234        80
WVCT   2025250    200200   19.4600  146.1300       7.9        94       229        87
WVCT   2025250    200200   19.4600  145.9700      11.5       119       210        97
WVCT   2025250    200200   19.4100  145.8900      12.2       126       211        90
WVCT   2025250    200200   19.4300  145.7500      12.6       118       213        93
WVCT   2025250    200200   19.3900  145.7100      11.9       114       213        95
WVCT   2025250    200200   19.4500  145.5800      14.0       117       212        96
WVCT   2025250    200200   19.4500  145.5400      14.1       118       214        95
WVCT   2025250    200200   19.3700  145.3500      18.4        96       217        83
WVCT   2025250    200200   19.3700  145.3000      21.2        91       212        69
WVCT   2025250    200200   19.4100  145.1800      26.5        93       205        66
WVCT   2025250    200200   19.4300  145.0800      27.4        97       197        73
WVCT   2025250    200200   19.4500  144.9100       9.2       153       205        68
WVCT   2025250    200200   19.4400  144.6300      11.6       216       205        68
WVCT   2025250    200200   19.4400  144.5400      11.6       196       209        75
WVCT   2025250    200200   19.4400  144.4400      11.4       180       217        81
WVCT   2025250    200200   19.4200  144.2800      10.7       157       213        87
WVCT   2025250    200200   19.4400  144.2600      11.1       156       219        90
WVCT   2025250    200200   19.4200  144.0800       9.9       176       222        82
WVCT   2025250    200200   19.4000  144.0400       9.2       186       224        78
WVCT   2025250    200200   19.4000  143.9500       9.0       193       233        79
WVCT   2025250    200200   19.3800  143.7900       8.9       200       239        79
WVCT   2025250    200200   19.3600  143.7500       9.5       194       248        62
WVCT   2025250    200200   19.4000  143.6700       8.8       179       246        72
WVCT   2025250    200200   19.3600  143.5500       6.9       159       252        62
WVCT   2025250    200200   19.4100  143.4000       7.8       191       263        83
WVCT   2025250    200200   19.3700  143.3600       6.9       197       268        78
WVCT   2025250    200200   19.3500  143.2800       6.9       208       273        71
WVCT   2025250    200200   19.4300  142.7400       5.1       200       318        67
WVCT   2025250    200200   19.3300  147.0200      12.3       137       343        83
WVCT   2025250    200200   19.3100  146.9800      11.7       136       312        79
WVCT   2025250    200200   19.3400  146.8700      10.3       137       306        66
WVCT   2025250    200200   19.2800  146.6300       7.2       133       327        66
WVCT   2025250    200200   19.3600  146.5500       6.2       114       299        73
WVCT   2025250    200200   19.3600  146.4500       8.4       131       273        87
WVCT   2025250    200200   19.2800  146.3700      13.6       151       259        84
WVCT   2025250    200200   19.3600  146.3000      12.4       134       250        75
WVCT   2025250    200200   19.3200  146.2000      11.3       121       223        78
WVCT   2025250    200200   19.3200  146.0400      12.1       115       214        97
WVCT   2025250    200200   19.3200  145.9800      13.1       117       212        94
WVCT   2025250    200200   19.3300  145.8400      10.3       120       214        93
WVCT   2025250    200200   19.2900  145.8200       9.0       116       214        90
WVCT   2025250    200200   19.3500  145.6900      11.8       107       212        97
WVCT   2025250    200200   19.2700  145.5400      19.4        97       201        78
WVCT   2025250    200200   19.2900  145.5300      18.7       101       206        78
WVCT   2025250    200200   19.3100  145.3900      18.2        98       206        88
WVCT   2025250    200200   19.3500  145.2900      20.7        90       204        71
WVCT   2025250    200200   19.3500  145.2400      20.6        91       193        67
WVCT   2025250    200200   19.3300  145.1200      18.9       101       185        76
WVCT   2025250    200200   19.3500  144.8600       7.1       180       188        64
WVCT   2025250    200200   19.3300  144.8400       6.3       185       186        68
WVCT   2025250    200200   19.3200  144.4300       8.4       155       197        60
WVCT   2025250    200200   19.2800  144.2500      11.1       163       206        79
WVCT   2025250    200200   19.3200  144.0000       9.2       178       218        66
WVCT   2025250    200200   19.2600  143.9000       6.1       185       233        86
WVCT   2025250    200200   19.3200  143.8400       6.4       190       241        76
WVCT   2025250    200200   19.3200  143.6700       8.3       187       250        61
WVCT   2025250    200200   19.3300  143.3400       6.1       197       268        84
WVCT   2025250    200200   19.2500  143.1800       6.9       210       288        65
WVCT   2025250    200200   19.2500  147.0200      10.1       135       334        82
WVCT   2025250    200200   19.2700  146.9600       9.4       132       307        68
WVCT   2025250    200200   19.2300  146.8600       7.1       131       308        63
WVCT   2025250    200200   19.1800  146.8000       7.2       130       338        84
WVCT   2025250    200200   19.2000  146.6400       7.7       133       329        66
WVCT   2025250    200200   19.2400  146.5300       7.8       122       279        72
WVCT   2025250    200200   19.1800  146.4200      11.0       139       270        77
WVCT   2025250    200200   19.2600  146.3700      14.0       151       254        84
WVCT   2025250    200200   19.1800  146.2700      11.6       129       220        73
WVCT   2025250    200200   19.1800  146.1700      12.4       118       215        86
WVCT   2025250    200200   19.2000  146.1100      13.9       120       214        84
WVCT   2025250    200200   19.2200  145.9300      13.5       127       211        79
WVCT   2025250    200200   19.2400  145.9200      13.0       125       212        81
WVCT   2025250    200200   19.2100  145.7400      11.7       111       205        86
WVCT   2025250    200200   19.1700  145.6800      13.9       110       191        96
WVCT   2025250    200200   19.2300  145.6000      20.6        91       197        87
WVCT   2025250    200200   19.2500  145.4600      21.1        96       192        77
WVCT   2025250    200200   19.1700  145.4000      19.9        92       180        89
WVCT   2025250    200200   19.1700  145.2800      18.1       102       173        68
WVCT   2025250    200200   19.1700  145.1100      12.1       118       170        87
WVCT   2025250    200200   19.2300  144.9700      12.0       121       174        77
WVCT   2025250    200200   19.2300  144.9000       8.5       124       174        85
WVCT   2025250    200200   19.2100  144.8000       7.3       113       178        63
WVCT   2025250    200200   19.1700  144.7400       7.2       120       178        77
WVCT   2025250    200200   19.2200  144.2900       6.9       152       199        82
WVCT   2025250    200200   19.2400  144.2500       9.5       165       203        88
WVCT   2025250    200200   19.1600  144.0300      11.4       182       213        63
WVCT   2025250    200200   19.1600  143.9200       8.4       197       227        84
WVCT   2025250    200200   19.2000  143.8600       5.9       199       238        77
WVCT   2025250    200200   19.2400  143.4900       4.5       147       264        72
WVCT   2025250    200200   19.2400  143.3300       4.1       172       270        67
WVCT   2025250    200200   19.2300  143.2000       6.9       207       276        66
WVCT   2025250    200200   19.2300  143.1800       7.1       208       282        67
WVCT   2025250    200200   19.0900  146.9900       9.8       133       340        81
WVCT   2025250    200200   19.1500  146.8900       7.9       129       313        66
WVCT   2025250    200200   19.1600  146.8000       7.4       130       343        84
WVCT   2025250    200200   19.1200  146.5600       9.0       122       283        75
WVCT   2025250    200200   19.1000  146.4200       8.6       102       266        87
WVCT   2025250    200200   19.1600  146.3800       9.8       130       246        73
WVCT   2025250    200200   19.1200  146.2800      10.3       114       220        88
WVCT   2025250    200200   19.1000  146.1800      12.8       122       215        79
WVCT   2025250    200200   19.0800  146.0200      11.7       120       206        86
WVCT   2025250    200200   19.1200  145.9900      12.4       121       207        88
WVCT   2025250    200200   19.1000  145.8900      12.1       120       202        86
WVCT   2025250    200200   19.0800  145.7900      13.9       137       192        79
WVCT   2025250    200200   19.1500  145.6900      13.2       121       191        83
WVCT   2025250    200200   19.0700  145.5300      15.6       102       174        91
WVCT   2025250    200200   19.1300  145.4400      18.0        95       176        90
WVCT   2025250    200200   19.1500  145.4200      19.0        94       179        90
WVCT   2025250    200200   19.1300  145.3200      17.7       102       169        73
WVCT   2025250    200200   19.1300  145.0900      12.0       120       165        74
WVCT   2025250    200200   19.1500  145.0300      10.9       126       168        77
WVCT   2025250    200200   19.1100  144.8700       7.3       134       168        70
WVCT   2025250    200200   19.1300  144.6500       8.5       131       178        77
WVCT   2025250    200200   19.1300  144.6400       7.9       133       179        84
WVCT   2025250    200200   19.0800  144.4800       6.0       123       186        75
WVCT   2025250    200200   19.0600  144.2000      12.4       158       198        87
WVCT   2025250    200200   19.1200  144.0700      11.6       178       207        66
WVCT   2025250    200200   19.1200  143.8700       8.4       208       234        84
WVCT   2025250    200200   19.0800  143.8100       7.8       210       243        79
WVCT   2025250    200200   19.0600  143.5800      11.2       161       256        83
WVCT   2025250    200200   19.0600  143.5000       8.3       173       262        79
WVCT   2025250    200200   19.0800  143.4600       7.2       173       264        79
WVCT   2025250    200200   19.0600  143.3100       5.0       181       269        83
WVCT   2025250    200200   19.1200  143.2300       4.0       179       272        68
WVCT   2025250    200200   19.0700  146.9900       9.7       132       344        82
WVCT   2025250    200200   19.0700  146.9300       8.0       127       328        79
WVCT   2025250    200200   18.9900  146.8000       7.6       117       340        78
WVCT   2025250    200200   19.0000  146.5100       8.2        74       282        82
WVCT   2025250    200200   18.9800  146.4100       9.3        61       260        86
WVCT   2025250    200200   19.0400  146.2800      10.4        96       220        94
WVCT   2025250    200200   19.0400  146.2400      11.2       113       217        89
WVCT   2025250    200200   18.9800  146.0800      11.7       123       203        90
WVCT   2025250    200200   18.9800  146.0400      10.9       117       195        91
WVCT   2025250    200200   18.9800  145.8600      13.8       137       191        75
WVCT   2025250    200200   19.0600  145.7900      14.4       140       191        81
WVCT   2025250    200200   18.9800  145.6600      13.8       137       179        86
WVCT   2025250    200200   18.9800  145.6400      13.7       132       176        89
WVCT   2025250    200200   19.0300  145.5500      14.4       115       168        95
WVCT   2025250    200200   18.9700  145.3700      11.6       123       155        72
WVCT   2025250    200200   18.9700  145.3500      12.1       122       154        72
WVCT   2025250    200200   18.9700  145.1700      11.7       127       152        60
WVCT   2025250    200200   18.9900  145.1200      12.9       132       155        61
WVCT   2025250    200200   19.0100  145.0600      14.3       133       158        70
WVCT   2025250    200200   18.9900  144.9600      15.0       139       160        97
WVCT   2025250    200200   18.9900  144.8200       9.7       160       165        84
WVCT   2025250    200200   19.0500  144.7300       9.5       143       170        62
WVCT   2025250    200200   18.9900  144.5700      13.6       146       175        61
WVCT   2025250    200200   19.0000  144.3900       8.7       137       188        88
WVCT   2025250    200200   19.0000  144.3600      10.9       139       190        90
WVCT   2025250    200200   19.0400  144.2000      12.6       155       197        93
WVCT   2025250    200200   18.9600  144.1400      13.3       161       199        90
WVCT   2025250    200200   18.9800  144.0000      11.7       173       205        73
WVCT   2025250    200200   18.9800  143.6900      10.5       180       263        83
WVCT   2025250    200200   18.9600  143.5400       7.8       186       262        84
WVCT   2025250    200200   18.9600  143.5000       6.8       197       263        84
WVCT   2025250    200200   19.0400  143.4000       6.5       189       265        85
WVCT   2025250    200200   18.9500  146.9200       7.4       113       337        71
WVCT   2025250    200200   18.9400  146.5400       7.7        78       282        84
WVCT   2025250    200200   18.9400  146.4500       9.6        46       273        85
WVCT   2025250    200200   18.9400  146.4300       9.7        49       270        84
WVCT   2025250    200200   18.9600  146.3300      11.1        56       222        77
WVCT   2025250    200200   18.9000  146.1500       9.8        99       211        94
WVCT   2025250    200200   18.9400  146.1100      10.7       112       209        93
WVCT   2025250    200200   18.9200  145.9500      12.6       123       193        82
WVCT   2025250    200200   18.9600  145.8600      14.0       139       191        68
WVCT   2025250    200200   18.9400  145.8400      15.3       142       189        61
WVCT   2025250    200200   18.9200  145.6800      12.3       136       168        92
WVCT   2025250    200200   18.9600  145.6400      13.4       130       168        94
WVCT   2025250    200200   18.9200  145.5400       9.1       128       160        73
WVCT   2025250    200200   18.9500  145.3700      11.6       124       153        74
WVCT   2025250    200200   18.9500  145.3500      12.2       123       152        73
WVCT   2025250    200200   18.8700  145.1700      14.4       132       155        87
WVCT   2025250    200200   18.8700  145.0700      16.4       130       160        94
WVCT   2025250    200200   18.8900  145.0500      17.8       127       160        92
WVCT   2025250    200200   18.8900  144.9100      15.2       127       166        93
WVCT   2025250    200200   18.9300  144.8000      10.9       162       167        85
WVCT   2025250    200200   18.9100  144.7600      11.8       164       169        77
WVCT   2025250    200200   18.9100  144.6400      14.6       161       174        82
WVCT   2025250    200200   18.8900  144.5600      13.8       156       181        92
WVCT   2025250    200200   18.9100  144.3900      11.5       147       187        91
WVCT   2025250    200200   18.8900  144.3700      11.1       152       188        77
WVCT   2025250    200200   18.8900  144.2500       9.3       155       193        69
WVCT   2025250    200200   18.9400  144.1800      13.6       156       197        89
WVCT   2025250    200200   18.9000  144.0800      14.1       169       204        85
WVCT   2025250    200200   18.8600  143.9200      14.8       165       217        77
WVCT   2025250    200200   18.9000  143.8200      10.8       176       239        81
WVCT   2025250    200200   18.8600  143.7600      10.1       179       261        83
WVCT   2025250    200200   18.9200  143.6300       9.5       186       266        87
WVCT   2025250    200200   18.9200  143.5100       7.3       198       265        85
WVCT   2025250    200200   18.9000  143.4900       7.3       203       268        82
WVCT   2025250    200200   18.8600  143.3900       7.0       203       272        76
WVCT   2025250    200200   18.8300  146.8700       7.5       110       346        78
WVCT   2025250    200200   18.8300  146.7500       8.1       116       339        77
WVCT   2025250    200200   18.7900  146.7100       7.3       100       327        89
WVCT   2025250    200200   18.8300  146.5800       7.9        74       285        94
WVCT   2025250    200200   18.8300  146.5200       8.6        69       281        63
WVCT   2025250    200200   18.8600  146.4000      11.7        43       242        70
WVCT   2025250    200200   18.8000  146.2800      11.0        65       217        81
WVCT   2025250    200200   18.8400  146.1400      10.3        93       209        90
WVCT   2025250    200200   18.8600  146.1100      10.4        97       200        85
WVCT   2025250    200200   18.8600  145.9900      12.5       105       192        79
WVCT   2025250    200200   18.8000  145.8700      14.6       141       188        65
WVCT   2025250    200200   18.7800  145.7700      14.7       160       166        62
WVCT   2025250    200200   18.8600  145.7100      12.8       152       167        82
WVCT   2025250    200200   18.8000  145.5900       8.9       152       158        83
WVCT   2025250    200200   18.7800  145.4900      10.7       157       154        65
WVCT   2025250    200200   18.7900  145.3600      14.6       130       151        92
WVCT   2025250    200200   18.8300  145.3000      15.9       125       151        87
WVCT   2025250    200200   18.8300  145.2400      15.6       129       153        92
WVCT   2025250    200200   18.8500  145.0900      15.5       135       160        96
WVCT   2025250    200200   18.8100  145.0500      18.5       125       165        81
WVCT   2025250    200200   18.8100  144.9500      17.4       126       171        86
WVCT   2025250    200200   18.7700  144.7700      12.8       158       178        77
WVCT   2025250    200200   18.8500  144.6800      12.5       166       175        98
WVCT   2025250    200200   18.8100  144.5800      15.4       161       183        84
WVCT   2025250    200200   18.7900  144.5600      16.2       160       183        84
WVCT   2025250    200200   18.7700  144.4400      20.2       162       187        72
WVCT   2025250    200200   18.8500  144.3300      11.3       160       189        72
WVCT   2025250    200200   18.7900  144.2100      10.2       168       194        95
WVCT   2025250    200200   18.8300  144.1700      11.1       164       201        93
WVCT   2025250    200200   18.7700  144.0500      13.9       163       207        81
WVCT   2025250    200200   18.8400  143.9200      15.2       164       217        80
WVCT   2025250    200200   18.8200  143.8000      11.8       172       240        89
WVCT   2025250    200200   18.7600  143.7600      11.6       172       249        84
WVCT   2025250    200200   18.8400  143.6500       8.8       179       282        86
WVCT   2025250    200200   18.8400  143.5700       8.2       184       280        67
WVCT   2025250    200200   18.8200  143.2400       5.2       187       270        78
WVCT   2025250    200200   18.7100  146.8200       7.4        97       349        85
WVCT   2025250    200200   18.7700  146.7500       7.5       105       339        87
WVCT   2025250    200200   18.6900  146.7000       8.8        58       326        79
WVCT   2025250    200200   18.6900  146.5300      10.0        57       282        75
WVCT   2025250    200200   18.7500  146.4500      10.7        56       270        90
WVCT   2025250    200200   18.7600  146.3700      12.9        47       248        87
WVCT   2025250    200200   18.7000  146.3100      12.0        64       232        88
WVCT   2025250    200200   18.7000  146.1400      11.1        82       209        89
WVCT   2025250    200200   18.7400  146.1200      11.2        83       202        89
WVCT   2025250    200200   18.6800  146.0000      13.3       102       188        77
WVCT   2025250    200200   18.6800  145.8800      13.5       127       180        74
WVCT   2025250    200200   18.7400  145.7900      13.7       155       166        69
WVCT   2025250    200200   18.7400  145.7300      11.9       156       164        73
WVCT   2025250    200200   18.7200  145.5500      11.7       159       156        79
WVCT   2025250    200200   18.7000  145.4700      13.2       142       156        69
WVCT   2025250    200200   18.7600  145.4000      13.5       137       153        72
WVCT   2025250    200200   18.7000  145.3300      18.0       114       162        89
WVCT   2025250    200200   18.6700  145.1600      31.9       102       170        72
WVCT   2025250    200200   18.7500  144.7900      14.3       152       180        78
WVCT   2025250    200200   18.6700  144.6900      13.3       166       186        90
WVCT   2025250    200200   18.7300  144.6500      12.6       165       183        79
WVCT   2025250    200200   18.6900  144.5300      15.7       165       188        94
WVCT   2025250    200200   18.7300  144.4600      20.2       166       188        82
WVCT   2025250    200200   18.6700  144.2800      20.2       174       189        89
WVCT   2025250    200200   18.7500  144.2100      11.4       173       193        88
WVCT   2025250    200200   18.7300  144.1700      11.7       169       196        85
WVCT   2025250    200200   18.7300  143.9900      13.4       161       211        94
WVCT   2025250    200200   18.6700  143.9500      11.2       166       219        93
WVCT   2025250    200200   18.7000  143.8700      13.6       162       235        91
WVCT   2025250    200200   18.6600  143.7000      12.6       166       263        87
WVCT   2025250    200200   18.6600  143.6800      12.0       166       280        92
WVCT   2025250    200200   18.6600  143.3300       8.0       196       275        65
WVCT   2025250    200200   18.7200  143.2300       5.7       190       270        73
WVCT   2025250    200200   18.7200  143.1800       4.2       187       270        67
WVCT   2025250    200200   18.6700  146.6200      10.5        49       301        88
WVCT   2025250    200200   18.6700  146.6000      10.8        48       296        90
WVCT   2025250    200200   18.6300  146.4200       9.7        64       260        92
WVCT   2025250    200200   18.6100  146.4000       9.3        67       253        96
WVCT   2025250    200200   18.6300  146.3100       9.9        73       237        84
WVCT   2025250    200200   18.6200  146.1300       9.9        86       205        87
WVCT   2025250    200200   18.5800  146.0900      10.1        97       192        88
WVCT   2025250    200200   18.5800  146.0100      12.0       114       185        65
WVCT   2025250    200200   18.6400  145.9000      13.5       129       176        70
WVCT   2025250    200200   18.6200  145.7400      11.4       157       165        84
WVCT   2025250    200200   18.5800  145.7000      12.5       162       164        80
WVCT   2025250    200200   18.5800  145.6200      15.7       163       161        83
WVCT   2025250    200200   18.5800  145.5200      16.0       146       160        84
WVCT   2025250    200200   18.6600  145.4100      16.9       108       161        89
WVCT   2025250    200200   18.5800  145.2500      24.8        94       178        68
WVCT   2025250    200200   18.6000  145.1500      27.1       100       183        80
WVCT   2025250    200200   18.6000  145.1300      24.8       104       185        67
WVCT   2025250    200200   18.5900  144.8600      21.9       166       188        75
WVCT   2025250    200200   18.6100  144.8400      22.0       163       187        89
WVCT   2025250    200200   18.6500  144.6900      13.7       164       187        92
WVCT   2025250    200200   18.6300  144.6500      12.6       160       189        82
WVCT   2025250    200200   18.6500  144.5100      14.9       166       189        95
WVCT   2025250    200200   18.5900  144.3900      16.8       179       189        88
WVCT   2025250    200200   18.5700  144.2700      19.1       179       190        89
WVCT   2025250    200200   18.5700  144.2500      18.5       180       191        88
WVCT   2025250    200200   18.6500  144.1000      10.9       173       200        87
WVCT   2025250    200200   18.6500  143.9900      10.6       167       212        85
WVCT   2025250    200200   18.6500  143.9300      10.6       168       224        90
WVCT   2025250    200200   18.6500  143.8500      12.8       163       239        81
WVCT   2025250    200200   18.6400  143.7000      13.0       166       259        89
WVCT   2025250    200200   18.6400  143.6800      12.4       167       277        93
WVCT   2025250    200200   18.5600  143.5600       7.9       167       307        66
WVCT   2025250    200200   18.6400  143.3100       8.2       196       273        71
WVCT   2025250    200200   18.5800  143.2900       8.9       193       274        60
WVCT   2025250    200200   18.6200  143.1500       6.3       169       265        65
WVCT   2025250    200200   18.5100  146.6700      11.8        54       327        91
WVCT   2025250    200200   18.5100  146.5300       9.5        58       284        79
WVCT   2025250    200200   18.4900  146.4500       7.8        75       272        90
WVCT   2025250    200200   18.5100  146.3200       7.5        88       244        79
WVCT   2025250    200200   18.5700  146.2800       8.3        84       234        92
WVCT   2025250    200200   18.4900  146.1400       9.5        97       209        84
WVCT   2025250    200200   18.5600  146.1100       9.8        96       195        84
WVCT   2025250    200200   18.5000  145.8700       9.5       136       171        81
WVCT   2025250    200200   18.5200  145.7300      11.9       156       167        74
WVCT   2025250    200200   18.5200  145.6900      12.1       159       166        81
WVCT   2025250    200200   18.5600  145.5400      16.7       154       161        82
WVCT   2025250    200200   18.4800  145.4400      16.3       133       168        79
WVCT   2025250    200200   18.4800  145.4000      16.2       123       172        81
WVCT   2025250    200200   18.4800  145.2600      21.7        94       182        86
WVCT   2025250    200200   18.5000  145.2200      21.7        95       185        77
WVCT   2025250    200200   18.4700  144.8300      21.1       169       197        78
WVCT   2025250    200200   18.4900  144.5600      10.8       161       193        92
WVCT   2025250    200200   18.4700  144.5400      12.1       159       192        85
WVCT   2025250    200200   18.4700  144.3700      13.4       185       189        87
WVCT   2025250    200200   18.4700  144.2700      14.8       183       192        86
WVCT   2025250    200200   18.5100  144.2500      15.8       182       192        89
WVCT   2025250    200200   18.5300  144.1400      12.9       187       201        89
WVCT   2025250    200200   18.4700  144.0000      11.2       193       213        87
WVCT   2025250    200200   18.5100  143.8800       9.6       181       224        85
WVCT   2025250    200200   18.4900  143.8600       9.2       181       226        86
WVCT   2025250    200200   18.4900  143.7700       8.7       168       238        77
WVCT   2025250    200200   18.5100  143.6100       8.2       161       286        80
WVCT   2025250    200200   18.5000  143.1500      12.1       162       265        90
WVCT   2025250    200200   18.5400  143.0100       7.4       157       270        65
WVCT   2025250    200200   18.4800  142.9700       9.2       163       285        61
WVCT   2025250    200200   18.4500  146.6300      11.8        57       300        92
WVCT   2025250    200200   18.3900  146.5500      12.0        39       291        85
WVCT   2025250    200200   18.4300  146.4300       7.8        61       265        89
WVCT   2025250    200200   18.3900  146.3100       7.9        64       248        97
WVCT   2025250    200200   18.4100  146.2700       7.8        73       242        86
WVCT   2025250    200200   18.3900  146.1200      10.8        68       201        84
WVCT   2025250    200200   18.3900  146.1000      11.0        70       191        84
WVCT   2025250    200200   18.3900  145.9000      10.3        95       172        90
WVCT   2025250    200200   18.3800  145.7400       9.4       121       172        80
WVCT   2025250    200200   18.4400  145.6700      10.1       152       166        84
WVCT   2025250    200200   18.4600  145.5700      14.9       153       164        83
WVCT   2025250    200200   18.4400  145.4400      16.8       145       171        82
WVCT   2025250    200200   18.4000  145.3500      15.7       118       183        90
WVCT   2025250    200200   18.4200  145.2800      19.3       102       182        90
WVCT   2025250    200200   18.4400  145.2200      19.3       101       183        81
WVCT   2025250    200200   18.4000  144.8300      22.9       166       201        78
WVCT   2025250    200200   18.4500  144.5600      13.6       158       194        76
WVCT   2025250    200200   18.3700  144.4800      12.0       178       194        80
WVCT   2025250    200200   18.3700  144.4400      12.4       178       193        87
WVCT   2025250    200200   18.4500  144.3100      14.3       184       191        85
WVCT   2025250    200200   18.4100  144.2100      13.6       185       202        91
WVCT   2025250    200200   18.4500  144.0700      11.9       196       208        82
WVCT   2025250    200200   18.4500  144.0000      11.2       195       212        87
WVCT   2025250    200200   18.4100  143.9600      10.7       194       215        85
WVCT   2025250    200200   18.4300  143.8000       7.6       185       229        82
WVCT   2025250    200200   18.4100  143.6800       6.2       180       242        81
WVCT   2025250    200200   18.3900  143.6600       5.5       183       242        85
WVCT   2025250    200200   18.3900  143.2800       8.3       182       283        64
WVCT   2025250    200200   18.3600  143.1000      13.3       173       265        91
WVCT   2025250    200200   18.3800  143.0800      14.0       170       264        89
WVCT   2025250    200200   18.3800  142.9700      11.3       165       268        76
WVCT   2025250    200200   18.3100  146.6000      13.7        33       332        82
WVCT   2025250    200200   18.3700  146.5300      12.3        35       291        78
WVCT   2025250    200200   18.3300  146.4000      10.8        38       273        88
WVCT   2025250    200200   18.3100  146.3800      11.0        37       270        90
WVCT   2025250    200200   18.3700  146.2900       8.2        63       246        98
WVCT   2025250    200200   18.3300  146.1100      12.6        53       207        88
WVCT   2025250    200200   18.3100  146.0700      13.4        47       191        87
WVCT   2025250    200200   18.2900  145.9900      11.9        47       174        84
WVCT   2025250    200200   18.3100  145.8200      12.5        77       173        89
WVCT   2025250    200200   18.2900  145.7400       9.6        83       174        60
WVCT   2025250    200200   18.2800  145.5200       9.9       142       166        72
WVCT   2025250    200200   18.3000  145.4900      11.9       144       172        80
WVCT   2025250    200200   18.3600  145.3700      14.1       125       186        85
WVCT   2025250    200200   18.2800  145.2300       8.6       119       182        82
WVCT   2025250    200200   18.2800  145.2100       8.4       123       180        80
WVCT   2025250    200200   18.2800  144.9400      13.1       193       182        63
WVCT   2025250    200200   18.3400  144.8600      21.7       166       192        72
WVCT   2025250    200200   18.2800  144.7100      16.7       182       207        87
WVCT   2025250    200200   18.3400  144.6300      19.2       169       210        70
WVCT   2025250    200200   18.3500  144.4800      12.5       179       196        73
WVCT   2025250    200200   18.3500  144.4400      12.7       178       195        82
WVCT   2025250    200200   18.2900  144.3000      15.5       181       203        86
WVCT   2025250    200200   18.3500  144.1900      13.5       181       207        92
WVCT   2025250    200200   18.3300  144.0900      12.7       188       213        89
WVCT   2025250    200200   18.3300  144.0100      11.4       193       213        87
WVCT   2025250    200200   18.3300  143.8900       9.7       184       220        88
WVCT   2025250    200200   18.3500  143.7800       8.1       191       228        82
WVCT   2025250    200200   18.3300  143.7400       8.1       195       230        79
WVCT   2025250    200200   18.2700  143.5800       5.7       201       242        64
WVCT   2025250    200200   18.2700  143.5600       5.5       205       243        61
WVCT   2025250    200200   18.2900  143.4700       5.1       210       263        64
WVCT   2025250    200200   18.2700  143.3100       6.0       175       271        73
WVCT   2025250    200200   18.2700  143.2700       6.9       174       273        70
WVCT   2025250    200200   18.3400  143.1000      13.0       175       265        91
WVCT   2025250    200200   18.3100  143.0800      13.3       178       259        90
WVCT   2025250    200200   18.2600  142.9000       5.7       161       253        60
WVCT   2025250    200200   18.2700  146.5600      15.0        24       313        78
WVCT   2025250    200200   18.1900  146.4400      13.6        23       298        95
WVCT   2025250    200200   18.2700  146.3400      11.3        37       261        91
WVCT   2025250    200200   18.2300  146.2600      11.4        43       246        94
WVCT   2025250    200200   18.2300  146.1600      12.2        46       226        86
WVCT   2025250    200200   18.2100  146.0500      13.8        42       201        93
WVCT   2025250    200200   18.2300  145.9900      13.1        42       176        97
WVCT   2025250    200200   18.1900  145.8100      11.6        71       173        81
WVCT   2025250    200200   18.2700  145.7400       9.4        72       174        70
WVCT   2025250    200200   18.2600  145.5200       9.1       138       167        73
WVCT   2025250    200200   18.2000  145.4600       6.7       129       190        95
WVCT   2025250    200200   18.1800  145.3200       4.5       138       209        71
WVCT   2025250    200200   18.1800  145.3000       4.6       141       205        85
WVCT   2025250    200200   18.2200  145.1700       6.1       155       179        61
WVCT   2025250    200200   18.1800  145.1100       6.8       161       169        86
WVCT   2025250    200200   18.1800  144.9700      13.0       175       178        67
WVCT   2025250    200200   18.1800  144.9100      14.9       181       183        77
WVCT   2025250    200200   18.1800  144.7600      13.7       188       194        84
WVCT   2025250    200200   18.2600  144.6900      16.6       182       210        88
WVCT   2025250    200200   18.1800  144.6000      19.2       177       220        82
WVCT   2025250    200200   18.2600  144.4500      14.2       182       207        77
WVCT   2025250    200200   18.2600  144.4300      14.1       183       207        74
WVCT   2025250    200200   18.2300  144.3200      15.7       182       207        84
WVCT   2025250    200200   18.1700  144.2000      14.6       178       213        95
WVCT   2025250    200200   18.1700  144.1400      13.6       180       217        94
WVCT   2025250    200200   18.1900  143.9800      10.9       188       220        87
WVCT   2025250    200200   18.2500  143.9300      10.7       182       219        80
WVCT   2025250    200200   18.2300  143.8500      11.5       180       226        74
WVCT   2025250    200200   18.2300  143.6800       9.6       192       232        81
WVCT   2025250    200200   18.2100  143.5800       6.7       198       239        71
WVCT   2025250    200200   18.1900  143.5600       6.6       201       239        72
WVCT   2025250    200200   18.1900  143.4200       6.6       211       241        84
WVCT   2025250    200200   18.2500  143.2900       6.2       174       270        72
WVCT   2025250    200200   18.1900  143.2700       6.2       175       259        87
WVCT   2025250    200200   18.1900  143.1300      10.2       186       271        80
WVCT   2025250    200200   18.1900  143.0400      10.4       176       253        91
WVCT   2025250    200200   18.2500  142.9000       5.5       160       253        63
WVCT   2025250    200200   18.1500  146.5300      13.3        24       327        97
WVCT   2025250    200200   18.1500  146.4100      12.2        27       297        96
WVCT   2025250    200200   18.0900  146.3100       9.4        42       274        92
WVCT   2025250    200200   18.1700  146.2400      11.2        42       245        85
WVCT   2025250    200200   18.1100  146.1000      11.0        46       219        83
WVCT   2025250    200200   18.1300  146.0000      11.1        45       189        92
WVCT   2025250    200200   18.0900  145.9800       9.9        43       188        90
WVCT   2025250    200200   18.1700  145.8100      11.7        68       174        80
WVCT   2025250    200200   18.0900  145.7800      11.2        53       175        94
WVCT   2025250    200200   18.1300  145.6300       6.7        40       172        74
WVCT   2025250    200200   18.1000  145.3000       4.6       143       191        71
WVCT   2025250    200200   18.1600  145.1100       7.0       160       170        85
WVCT   2025250    200200   18.0800  144.9900      12.3       172       179        85
WVCT   2025250    200200   18.1200  144.8300      13.9       185       188        86
WVCT   2025250    200200   18.1000  144.8100      13.3       186       190        85
WVCT   2025250    200200   18.1600  144.7000      15.4       181       209        86
WVCT   2025250    200200   18.1600  144.5800      19.7       178       221        86
WVCT   2025250    200200   18.1400  144.4500      15.5       183       215        88
WVCT   2025250    200200   18.1600  144.4300      15.0       182       212        82
WVCT   2025250    200200   18.1000  144.2500      12.6       188       217        88
WVCT   2025250    200200   18.1400  144.1900      13.9       180       216        91
WVCT   2025250    200200   18.1400  144.1400      13.2       182       219        93
WVCT   2025250    200200   18.1100  143.9600      10.8       192       227        75
WVCT   2025250    200200   18.0900  143.8800      10.6       185       229        67
WVCT   2025250    200200   18.0700  143.8200      10.9       183       230        86
WVCT   2025250    200200   18.1500  143.6900      11.3       178       232        63
WVCT   2025250    200200   18.1500  143.6300       9.7       175       233        70
WVCT   2025250    200200   18.0900  143.5200       7.0       192       242        83
WVCT   2025250    200200   18.1100  143.4000       6.6       210       236        84
WVCT   2025250    200200   18.1100  143.3200       6.0       190       232        77
WVCT   2025250    200200   18.1100  143.1900       9.7       184       274        86
WVCT   2025250    200200   18.1100  143.0900      10.3       184       281        87
WVCT   2025250    200200   18.0700  143.0300       8.6       177       277        83
WVCT   2025250    200200   18.1100  142.9400       5.4       166       253        61
WVCT   2025250    200200   18.0200  146.4600       9.5        31       315        91
WVCT   2025250    200200   18.0500  146.3500       9.4        42       284        88
WVCT   2025250    200200   18.0100  146.2700       9.0        45       270        82
WVCT   2025250    200200   18.0100  146.1700       8.8        44       239        86
WVCT   2025250    200200   18.0700  146.0600       9.7        47       214        84
WVCT   2025250    200200   18.0500  145.9600       8.8        44       184        88
WVCT   2025250    200200   17.9900  145.9300       7.8        46       187        88
WVCT   2025250    200200   18.0300  145.7600      10.8        44       176        92
WVCT   2025250    200200   17.9900  145.7400      11.2        39       177        82
WVCT   2025250    200200   17.9900  145.6400       9.5        40       177        80
WVCT   2025250    200200   17.9800  145.1000       6.8       164       169        71
WVCT   2025250    200200   18.0600  144.9900      12.1       173       179        85
WVCT   2025250    200200   18.0400  144.9500      12.4       176       185        82
WVCT   2025250    200200   18.0400  144.7900      11.3       186       194        89
WVCT   2025250    200200   18.0000  144.7500       9.1       188       201        75
WVCT   2025250    200200   18.0600  144.6400      14.3       185       226        69
WVCT   2025250    200200   17.9800  144.5000      11.5       204       223        86
WVCT   2025250    200200   18.0000  144.4800      11.8       201       221        87
WVCT   2025250    200200   17.9800  144.3400      13.0       199       223        85
WVCT   2025250    200200   18.0200  144.2100      12.9       184       222        82
WVCT   2025250    200200   18.0200  144.1300      13.6       177       228        89
WVCT   2025250    200200   18.0600  144.0200      11.8       188       229        85
WVCT   2025250    200200   18.0400  143.9400      10.6       192       229        84
WVCT   2025250    200200   18.0500  143.8600      10.3       186       230        85
WVCT   2025250    200200   18.0500  143.8000      10.7       180       230        81
WVCT   2025250    200200   17.9900  143.7000      11.3       172       235        75
WVCT   2025250    200200   17.9900  143.5500       8.4       165       250        82
WVCT   2025250    200200   17.9700  143.4700       6.2       175       254        79
WVCT   2025250    200200   17.9700  143.1600       7.4       176       292        64
WVCT   2025250    200200   18.0100  143.0900       9.4       181       293        85
WVCT   2025250    200200   18.0500  143.0300       8.5       176       280        82
WVCT   2025250    200200   17.9000  146.5300       6.0        34       329        85
WVCT   2025250    200200   17.9000  146.5100       6.6        32       326        85
WVCT   2025250    200200   17.9600  146.4200       9.9        30       300        91
WVCT   2025250    200200   17.9200  146.2400      10.1        39       262        68
WVCT   2025250    200200   17.9400  146.1800       9.0        40       252        77
WVCT   2025250    200200   17.9300  146.0500       8.3        47       221        86
WVCT   2025250    200200   17.9300  145.9500       7.5        47       207        86
WVCT   2025250    200200   17.9100  145.8700       6.0        43       189        76
WVCT   2025250    200200   17.9100  145.7900       7.2        37       176        75
WVCT   2025250    200200   17.9100  145.6600      10.5        40       171        78
WVCT   2025250    200200   17.9500  145.6400      10.5        40       175        78
WVCT   2025250    200200   17.9700  145.1200       5.7       166       168        65
WVCT   2025250    200200   17.9600  145.0200       8.1       172       179        76
WVCT   2025250    200200   17.8900  144.9000       7.9       189       183        78
WVCT   2025250    200200   17.9000  144.7800       7.0       185       200        66
WVCT   2025250    200200   17.9200  144.4900      10.0       205       227        84
WVCT   2025250    200200   17.9400  144.4000      10.0       205       230        86
WVCT   2025250    200200   17.9000  144.3400       9.7       204       231        82
WVCT   2025250    200200   17.8800  144.2800       8.4       198       228        77
WVCT   2025250    200200   17.8800  144.1400      12.3       173       235        61
WVCT   2025250    200200   17.9600  144.0900      14.7       176       235        85
WVCT   2025250    200200   17.9200  143.9100      10.0       182       237        84
WVCT   2025250    200200   17.9200  143.8900       9.8       179       237        78
WVCT   2025250    200200   17.9200  143.8000      11.0       178       235        87
WVCT   2025250    200200   17.9600  143.6800      11.2       175       241        82
WVCT   2025250    200200   17.9400  143.6000       9.2       166       247        73
WVCT   2025250    200200   17.8800  143.4300       5.9       168       257        85
WVCT   2025250    200200   17.9300  143.4100       5.6       173       257        80
WVCT   2025250    200200   17.9100  143.0800       8.1       176       298        72
WVCT   2025250    200200   17.8700  142.9700       8.2       171       273        92
WVCT   2025250    200200   17.9100  142.9300       9.7       166       263        92
WVCT   2025250    200200   17.8700  142.6200       4.0       149       283        74
WVCT   2025250    200200   17.8700  142.5800       4.8       150       284        66
WVCT   2025250    200200   17.8600  146.5900       4.3        39       335        82
WVCT   2025250    200200   17.8000  146.5300       5.2        35       320        78
WVCT   2025250    200200   17.8000  146.4500       6.8        34       310        81
WVCT   2025250    200200   17.8400  146.3300      10.1        37       280        95
WVCT   2025250    200200   17.8600  146.1800       8.9        43       256        64
WVCT   2025250    200200   17.8800  146.1600       8.6        44       252        67
WVCT   2025250    200200   17.8400  145.9800       6.0        43       241        60
WVCT   2025250    200200   17.8700  144.9200       7.0       193       182        78
WVCT   2025250    200200   17.7900  144.8500       4.2       196       185        84
WVCT   2025250    200200   17.7900  144.6000       5.9       203       234        66
WVCT   2025250    200200   17.7800  144.4300       5.6       211       239        66
WVCT   2025250    200200   17.8400  144.1400      11.1       169       237        65
WVCT   2025250    200200   17.8600  144.1200      12.3       173       239        66
WVCT   2025250    200200   17.8600  144.0100      11.5       184       245        76
WVCT   2025250    200200   17.8600  143.9100       9.5       176       243        88
WVCT   2025250    200200   17.8200  143.7700      11.4       179       250        89
WVCT   2025250    200200   17.8200  143.6800      11.6       183       248        82
WVCT   2025250    200200   17.8000  143.6200       9.7       177       247        75
WVCT   2025250    200200   17.7800  143.4800       6.0       169       252        86
WVCT   2025250    200200   17.8600  143.4100       6.4       170       257        84
WVCT   2025250    200200   17.7800  143.3100       7.6       184       260        73
WVCT   2025250    200200   17.8200  143.2100       6.9       169       268        66
WVCT   2025250    200200   17.7800  143.1000       4.3       166       298        71
WVCT   2025250    200200   17.7700  142.9800       4.5       160       263        81
WVCT   2025250    200200   17.8100  142.9600       6.5       166       260        89
WVCT   2025250    200200   17.7700  142.6000       5.1       157       293        62
WVCT   2025250    200200   17.8500  142.5000       6.1       154       289        70
WVCT   2025250    200200   17.7400  146.5200       4.6        29       313        70
WVCT   2025250    200200   17.7800  146.4300       6.8        33       307        81
WVCT   2025250    200200   17.7000  146.2700       7.6        47       282        81
WVCT   2025250    200200   17.7600  146.2500       8.9        45       269        91
WVCT   2025250    200200   17.7000  146.0700       6.6        45       257        68
WVCT   2025250    200200   17.7000  145.9800       6.3        45       248        72
WVCT   2025250    200200   17.7100  145.3400       4.4       256       179        77
WVCT   2025250    200200   17.7300  145.2600       5.1       265       174        94
WVCT   2025250    200200   17.6900  145.1600       4.7       266       184        69
WVCT   2025250    200200   17.7700  144.6000       5.5       203       235        65
WVCT   2025250    200200   17.7100  144.4600       4.6       210       243        71
WVCT   2025250    200200   17.7600  144.1200       9.8       169       248        64
WVCT   2025250    200200   17.6800  143.9800      11.1       185       259        92
WVCT   2025250    200200   17.6800  143.8800      10.2       183       265        89
WVCT   2025250    200200   17.7600  143.7500      10.5       182       254        88
WVCT   2025250    200200   17.7400  143.6900      10.0       183       251        85
WVCT   2025250    200200   17.7000  143.5800       8.8       169       251        90
WVCT   2025250    200200   17.6800  143.5000       6.9       172       264        88
WVCT   2025250    200200   17.7400  143.4400       5.8       172       255        85
WVCT   2025250    200200   17.7200  143.2900       8.3       192       260        79
WVCT   2025250    200200   17.7200  143.2500       8.1       192       257        83
WVCT   2025250    200200   17.7500  142.9600       4.7       152       260        76
WVCT   2025250    200200   17.6300  146.6300       4.7       335       340        87
WVCT   2025250    200200   17.6200  146.3200       5.0        24       308        85
WVCT   2025250    200200   17.6200  146.2400       6.0        37       288        84
WVCT   2025250    200200   17.6000  146.1100       6.8        44       267        78
WVCT   2025250    200200   17.6600  146.0100       7.2        48       258        66
WVCT   2025250    200200   17.6400  145.9900       7.5        51       258        78
WVCT   2025250    200200   17.6000  145.8900       7.4        50       249        83
WVCT   2025250    200200   17.6000  145.7800       5.0        47       241        65
WVCT   2025250    200200   17.6700  145.4300       4.4       264       204        63
WVCT   2025250    200200   17.6500  145.3700       5.8       267       204        69
WVCT   2025250    200200   17.6700  145.2400       5.0       273       187        87
WVCT   2025250    200200   17.6700  145.2200       4.9       272       186        87
WVCT   2025250    200200   17.6100  144.3600       4.3       175       256        65
WVCT   2025250    200200   17.6300  144.3400       4.4       174       248        74
WVCT   2025250    200200   17.6200  144.0700      11.0       178       268        64
WVCT   2025250    200200   17.6400  144.0500      11.2       179       268        74
WVCT   2025250    200200   17.6000  143.9000      10.9       185       268        88
WVCT   2025250    200200   17.6200  143.8400       9.8       191       265        88
WVCT   2025250    200200   17.5800  143.7100       6.8       180       264        75
WVCT   2025250    200200   17.6400  143.6700       8.5       176       258        89
WVCT   2025250    200200   17.5800  143.4900       6.7       169       284        87
WVCT   2025250    200200   17.6600  143.4800       6.6       170       272        81
WVCT   2025250    200200   17.6400  143.3800       5.6       182       284        60
WVCT   2025250    200200   17.6000  143.2100       7.3       190       243        74
WVCT   2025250    200200   17.6400  143.1900       6.9       189       244        82
WVCT   2025250    200200   17.5400  146.2000       4.6        29       294        84
WVCT   2025250    200200   17.5400  146.1600       5.2        33       278        82
WVCT   2025250    200200   17.5800  146.0700       6.4        41       267        78
WVCT   2025250    200200   17.5800  145.9300       7.1        48       260        83
WVCT   2025250    200200   17.5800  145.8700       7.1        48       250        79
WVCT   2025250    200200   17.5200  145.7500       5.5        36       241        71
WVCT   2025250    200200   17.5000  145.6900       4.5        31       234        65
WVCT   2025250    200200   17.5000  145.5900       4.2        48       228        69
WVCT   2025250    200200   17.4900  144.6700       4.4       283       251        75
WVCT   2025250    200200   17.5700  144.0900      10.6       182       274        69
WVCT   2025250    200200   17.5700  143.9700      11.5       187       271        82
WVCT   2025250    200200   17.5500  143.8800      10.3       187       271        87
WVCT   2025250    200200   17.4900  143.8200       8.4       193       272        87
WVCT   2025250    200200   17.5100  143.7400       7.0       187       268        82
WVCT   2025250    200200   17.5200  143.6100       6.7       173       262        89
WVCT   2025250    200200   17.4800  143.5300       6.0       170       269        84
WVCT   2025250    200200   17.5600  143.4700       6.4       166       293        80
WVCT   2025250    200200   17.5600  143.3800       5.6       169       284        67
WVCT   2025250    200200   17.5400  143.2000       7.1       180       239        80
WVCT   2025250    200200   17.5000  143.1800       6.6       175       236        85
WVCT   2025250    200200   17.5000  142.7400       4.4       152       290        64
WVCT   2025250    200200   17.4400  146.1000       4.4        12       294        84
WVCT   2025250    200200   17.4200  146.0600       4.1        10       289        82
WVCT   2025250    200200   17.4000  145.8000       4.2       339       257        82
WVCT   2025250    200200   17.4200  145.7100       4.3       334       238        73
WVCT   2025250    200200   17.4000  145.3200       7.6       299       231        79
WVCT   2025250    200200   17.4200  145.2600       6.8       297       227        74
WVCT   2025250    200200   17.4400  145.0100       9.9       286       247        68
WVCT   2025250    200200   17.4000  144.8900      10.2       292       248        73
WVCT   2025250    200200   17.4100  144.8000       7.4       289       251        74
WVCT   2025250    200200   17.4700  144.6800       4.8       284       251        75
WVCT   2025250    200200   17.4100  144.6000       4.6       279       266        73
WVCT   2025250    200200   17.4100  144.0600       6.5       189       282        80
WVCT   2025250    200200   17.4700  143.9900       8.9       186       280        76
WVCT   2025250    200200   17.4300  143.8700       8.1       189       277        85
WVCT   2025250    200200   17.4500  143.8000       7.2       195       270        85
WVCT   2025250    200200   17.3900  143.7000       5.4       193       268        86
WVCT   2025250    200200   17.4100  143.6600       5.4       188       266        87
WVCT   2025250    200200   17.3900  143.5400       5.3       170       278        78
WVCT   2025250    200200   17.4300  143.4700       5.6       160       294        70
WVCT   2025250    200200   17.4100  143.3100       7.6       158       262        91
WVCT   2025250    200200   17.4200  143.2200       6.9       169       241        88
WVCT   2025250    200200   17.3800  143.1200       6.5       168       247        79
WVCT   2025250    200200   17.4200  142.8100       7.5       166       341        73
WVCT   2025250    200200   17.4200  142.7900       6.8       165       341        70
WVCT   2025250    200200   17.3900  146.2900       5.5       285       348        79
WVCT   2025250    200200   17.3100  146.1900       4.8       288       335        60
WVCT   2025250    200200   17.3900  146.1100       4.3       355       308        65
WVCT   2025250    200200   17.3300  145.8900       4.0       330       279        70
WVCT   2025250    200200   17.3600  145.8400       4.2       345       266        81
WVCT   2025250    200200   17.3100  145.7600       6.2       318       254        61
WVCT   2025250    200200   17.3600  145.6500       8.9       296       234        77
WVCT   2025250    200200   17.3000  145.5400      13.7       286       238        85
WVCT   2025250    200200   17.3000  145.4300      13.5       283       240        83
WVCT   2025250    200200   17.3600  145.3900       8.0       292       234        78
WVCT   2025250    200200   17.3800  145.3000       8.4       296       234        79
WVCT   2025250    200200   17.3000  145.1800      11.3       289       246        83
WVCT   2025250    200200   17.3600  145.0400      11.9       287       246        81
WVCT   2025250    200200   17.3200  144.9300       7.2       284       250        86
WVCT   2025250    200200   17.3800  144.8300       7.8       289       254        79
WVCT   2025250    200200   17.3800  144.8100       7.3       285       255        79
WVCT   2025250    200200   17.3700  144.6400       5.5       265       271        76
WVCT   2025250    200200   17.3000  144.6200       4.5       247       280        66
WVCT   2025250    200200   17.2900  144.3300       4.4       164       270        66
WVCT   2025250    200200   17.3500  144.2100       6.0       173       281        85
WVCT   2025250    200200   17.2900  144.1200       4.3       201       283        72
WVCT   2025250    200200   17.3300  143.9600       6.7       193       284        74
WVCT   2025250    200200   17.3500  143.8700       6.8       194       284        86
WVCT   2025250    200200   17.3100  143.8300       5.1       201       285        84
WVCT   2025250    200200   17.3700  143.7000       5.3       192       266        86
WVCT   2025250    200200   17.3100  143.5800       5.4       167       272        75
WVCT   2025250    200200   17.3700  143.5600       5.2       171       275        77
WVCT   2025250    200200   17.3700  143.4600       6.2       159       289        71
WVCT   2025250    200200   17.2900  143.3700       9.0       154       268        86
WVCT   2025250    200200   17.3300  143.2100       5.5       161       243        89
WVCT   2025250    200200   17.3700  143.1400       6.1       167       246        88
WVCT   2025250    200200   17.2100  146.1200       6.6       282       344        85
WVCT   2025250    200200   17.2500  145.9700       5.4       307       304        65
WVCT   2025250    200200   17.2300  145.9100       6.2       301       298        79
WVCT   2025250    200200   17.2900  145.7600       6.3       319       262        64
WVCT   2025250    200200   17.2900  145.7200       8.2       307       253        66
WVCT   2025250    200200   17.2800  145.6400      11.1       295       247        79
WVCT   2025250    200200   17.2200  145.4800      12.8       285       254        93
WVCT   2025250    200200   17.2800  145.4500      13.8       284       247        85
WVCT   2025250    200200   17.2800  145.3500      11.9       286       247        89
WVCT   2025250    200200   17.2800  145.1800      11.1       290       246        86
WVCT   2025250    200200   17.2400  145.1200       9.4       297       245        84
WVCT   2025250    200200   17.2000  145.0400       5.6       293       250        70
WVCT   2025250    200200   17.2400  144.8100       4.6       183       302        70
WVCT   2025250    200200   17.2200  144.3000       5.3       181       266        62
WVCT   2025250    200200   17.2700  143.6000       5.6       166       264        78
WVCT   2025250    200200   17.2500  143.4600       8.5       150       276        72
WVCT   2025250    200200   17.2700  143.3600       8.9       152       267        86
WVCT   2025250    200200   17.2300  143.2700       5.3       150       242        74
WVCT   2025250    200200   17.2100  143.1900       4.1       147       250        85
WVCT   2025250    200200   17.2700  143.1300       5.1       150       269        69
WVCT   2025250    200200   17.1100  146.0600       9.5       302       326        74
WVCT   2025250    200200   17.1300  146.0400       9.4       300       314        70
WVCT   2025250    200200   17.1300  145.8800       8.4       286       283        81
WVCT   2025250    200200   17.1300  145.8100       8.2       293       278        90
WVCT   2025250    200200   17.1100  145.7100       8.9       292       265        88
WVCT   2025250    200200   17.1900  145.6500      10.2       299       271        73
WVCT   2025250    200200   17.1900  145.5400      12.2       286       255        95
WVCT   2025250    200200   17.1500  145.3800       7.3       284       262        90
WVCT   2025250    200200   17.1500  145.3600       6.9       285       262        89
WVCT   2025250    200200   17.1500  145.2500       5.7       288       269        78
WVCT   2025250    200200   17.1800  145.1700       6.6       298       258        81
WVCT   2025250    200200   17.1800  145.0600       5.3       298       252        70
WVCT   2025250    200200   17.1000  144.8400       4.9       165       310        83
WVCT   2025250    200200   17.1200  144.7800       4.9       171       309        84
WVCT   2025250    200200   17.1600  144.2200       7.7       217       261        78
WVCT   2025250    200200   17.1400  144.2000       8.1       221       261        81
WVCT   2025250    200200   17.1000  144.0500       4.0       198       277        85
WVCT   2025250    200200   17.1700  143.6700       4.4       169       247        65
WVCT   2025250    200200   17.1500  143.5500       7.7       151       256        69
WVCT   2025250    200200   17.1700  143.5300       8.1       151       264        70
WVCT   2025250    200200   17.1100  143.4300       8.0       146       263        61
WVCT   2025250    200200   17.1700  143.3000       4.6       145       249        85
WVCT   2025250    200200   17.1300  142.9000       8.4       163       339        79
WVCT   2025250    200200   17.0900  142.8400       7.6       157       338        89
WVCT   2025250    200200   17.1100  142.7600       4.2       144       293        71
WVCT   2025250    200200   17.0500  146.0700       9.6       303       318        76
WVCT   2025250    200200   17.0700  146.0400       9.5       302       306        72
WVCT   2025250    200200   17.0500  145.8600       6.0       285       282        90
WVCT   2025250    200200   17.0500  145.8400       6.2       285       281        91
WVCT   2025250    200200   17.0700  145.7100       8.6       285       265        88
WVCT   2025250    200200   17.0100  145.5700       7.1       275       267        74
WVCT   2025250    200200   17.0300  145.5500       7.2       276       260        76
WVCT   2025250    200200   17.0300  145.3900       5.8       268       277        83
WVCT   2025250    200200   17.0700  145.3400       5.1       274       275        85
WVCT   2025250    200200   17.0800  144.8600       4.0       165       310        81
WVCT   2025250    200200   17.0800  144.7800       4.4       179       307        83
WVCT   2025250    200200   17.0800  144.6600       4.2       229       290        65
WVCT   2025250    200200   17.0200  144.4100       4.0       235       262        83
WVCT   2025250    200200   17.0600  144.3200       6.6       215       234        71
WVCT   2025250    200200   17.0800  144.3000       6.4       215       234        87
WVCT   2025250    200200   17.0400  144.1400       7.3       218       250        77
WVCT   2025250    200200   17.0800  144.0700       4.8       204       275        86
WVCT   2025250    200200   17.0000  143.6400       6.1       157       227        92
WVCT   2025250    200200   17.0200  143.6200       6.4       156       229        91
WVCT   2025250    200200   17.0600  143.5100       8.0       149       259        73
WVCT   2025250    200200   17.0000  143.4300       7.6       153       264        72
WVCT   2025250    200200   17.0300  143.2600       5.4       157       238        83
WVCT   2025250    200200   17.0300  143.2400       5.1       158       238        84
WVCT   2025250    200200   16.9900  142.9700       8.5       161       269        74
WVCT   2025250    200200   17.0500  142.8600       8.6       158       343        90
WVCT   2025250    200200   16.9200  146.1200       4.6       293       323        75
WVCT   2025250    200200   16.9200  146.0100       4.2       281       305        80
WVCT   2025250    200200   16.9200  145.9300       4.1       282       305        74
WVCT   2025250    200200   16.9200  145.8100       4.7       289       314        62
WVCT   2025250    200200   16.9900  145.7400       6.7       282       282        76
WVCT   2025250    200200   16.9900  145.4100       5.9       270       298        68
WVCT   2025250    200200   16.9300  145.1400       4.5       278       297        81
WVCT   2025250    200200   16.9900  144.6800       4.4       233       289        77
WVCT   2025250    200200   16.9600  144.3900       4.3       234       245        77
WVCT   2025250    200200   16.9800  144.3300       6.3       219       233        67
WVCT   2025250    200200   16.9600  144.1800       6.4       196       225        91
WVCT   2025250    200200   16.9200  144.1400       5.7       183       263        85
WVCT   2025250    200200   16.9000  143.7100       5.5       156       223        80
WVCT   2025250    200200   16.9800  143.6400       6.5       157       226        93
WVCT   2025250    200200   16.9400  143.5400       8.2       151       262        92
WVCT   2025250    200200   16.9000  143.4100       8.8       152       272        91
WVCT   2025250    200200   16.9000  143.3300      10.0       156       234        94
WVCT   2025250    200200   16.9200  143.2500       9.2       161       237        85
WVCT   2025250    200200   16.9200  143.0400       7.3       162       251        89
WVCT   2025250    200200   16.9000  142.9300       8.4       154       291        89
WVCT   2025250    200200   16.9500  142.8900       8.9       155       337        88
WVCT   2025250    200200   16.9100  142.5500       4.6       136       253        68
WVCT   2025250    200200   16.8100  144.3400       4.2       188       241        75
WVCT   2025250    200200   16.8300  144.2700       5.3       176       237        65
WVCT   2025250    200200   16.8800  144.1500       6.0       173       274        66
WVCT   2025250    200200   16.8100  144.0000       4.0       164       299        84
WVCT   2025250    200200   16.8400  143.7700       4.2       155       227        80
WVCT   2025250    200200   16.8200  143.6300       7.1       152       241        69
WVCT   2025250    200200   16.8800  143.5800       8.2       153       259        80
WVCT   2025250    200200   16.8400  143.5000       8.3       150       289        88
WVCT   2025250    200200   16.8200  143.3800       9.0       151       243        91
WVCT   2025250    200200   16.8800  143.2700      10.5       159       238        84
WVCT   2025250    200200   16.8000  143.1300      10.3       162       255        90
WVCT   2025250    200200   16.8400  143.0600       8.5       161       249        85
WVCT   2025250    200200   16.8400  142.9500       7.6       148       283        73
WVCT   2025250    200200   16.8800  142.9300       7.9       152       297        86
WVCT   2025250    200200   16.8800  142.5800       4.4       136       245        74
WVCT   2025250    200200   16.8800  142.5400       4.2       135       250        90
WVCT   2025250    200200   16.7100  143.8200       4.5       140       237        60
WVCT   2025250    200200   16.7700  143.7500       4.4       145       230        75
WVCT   2025250    200200   16.7300  143.6100       7.4       150       260        65
WVCT   2025250    200200   16.7400  143.5900       7.9       151       266        67
WVCT   2025250    200200   16.7600  143.4200       8.7       152       254        86
WVCT   2025250    200200   16.7800  143.4000       8.6       151       245        89
WVCT   2025250    200200   16.7400  143.2700      11.1       158       247        84
WVCT   2025250    200200   16.7800  143.1300      10.3       162       251        93
WVCT   2025250    200200   16.7800  142.9800       7.0       145       249        69
WVCT   2025250    200200   16.6100  143.7200       7.3       152       235        87
WVCT   2025250    200200   16.6900  143.6900       6.2       147       239        66
WVCT   2025250    200200   16.6500  143.6100       8.5       154       252        78
WVCT   2025250    200200   16.6900  143.4600       9.4       153       253        87
WVCT   2025250    200200   16.6900  143.4200       8.9       154       239        93
WVCT   2025250    200200   16.6300  143.2400       9.9       152       242        93
WVCT   2025250    200200   16.6800  143.2300      11.6       160       249        91
WVCT   2025250    200200   16.5900  143.7400       7.6       153       236        84
WVCT   2025250    200200   16.5500  143.6200       8.7       162       248        98
WVCT   2025250    200200   16.5500  143.5300       9.7       156       249        98
WVCT   2025250    200200   16.5500  143.3900      10.8       148       231        74
WVCT   2025250    200200   16.5700  143.3700      10.5       149       231        77
WVCT   2025250    200200   16.4900  143.6400       7.5       168       250        83
WVCT   2025250    200200   16.4900  143.6200       7.5       165       251        85
WVCT   2025250    200200   16.4100  143.4800       8.4       153       231        97
WVCT   2025250    200200   16.4300  143.3700       7.8       149       223        92
WVCT   2025250    200200   16.3300  145.0900       7.2       118       338        69
WVCT   2025250    200200   16.3300  145.0300       6.7       119       303        69
WVCT   2025250    200200   16.3600  143.9200       5.7       144       224        68
WVCT   2025250    200200   16.3200  143.7500       7.4       157       276        88
WVCT   2025250    200200   16.3200  143.6900       5.8       156       274        89
WVCT   2025250    200200   16.3600  143.6000       4.4       146       255        66
WVCT   2025250    200200   16.4000  143.4800       7.7       153       229        93
WVCT   2025250    200200   16.3900  143.3900       6.9       155       222        76
WVCT   2025250    200200   16.3200  143.0400       5.3       137       210        94
WVCT   2025250    200200   16.3200  143.0200       5.7       137       213        98
WVCT   2025250    200200   16.3900  142.8700       4.7       131       236        91
WVCT   2025250    200200   16.3900  142.4500       4.9        64       247        84
WVCT   2025250    200200   16.2900  145.1100       6.4       118       300        72
WVCT   2025250    200200   16.3100  145.0500       6.8       118       274        74
WVCT   2025250    200200   16.3100  144.9700       4.9       126       225        75
WVCT   2025250    200200   16.2400  143.7600       6.3       144       278        74
WVCT   2025250    200200   16.2800  143.7100       6.0       149       278        80
WVCT   2025250    200200   16.2200  143.6300       4.1       129       241        60
WVCT   2025250    200200   16.2600  143.0200       4.5       130       212        70
WVCT   2025250    200200   16.2400  142.9400       4.8       128       261        70
WVCT   2025250    200200   16.1400  145.2100       4.1        97       191        83
WVCT   2025250    200200   16.1400  145.1800       4.3       102       191        82
WVCT   2025250    200200   16.1600  143.7800       4.5       138       271        78
WVCT   2025250    200200   16.1000  145.1500       5.1       106       190        60
WVCT   2025250    200200   16.0900  143.3900       4.8       148       219        67
WVCT   2025250    200200   16.0200  145.0900       5.0       111       198        70
WVCT   2025250    200200   16.0200  145.0200       4.2       100       199        85
WVCT   2025250    200200   16.0000  142.5500       4.0        80       255        70
WVCT   2025250    200200   16.0000  142.4400       4.2        86       264        61
WVCT   2025250    200200   15.8400  144.1500       4.0       130       326        83
WVCT   2025250    200200   15.9100  143.8300       4.9       132       228        84
WVCT   2025250    200200   15.8800  143.7700       4.2       142       209        73
WVCT   2025250    200200   15.8000  144.2800       4.0       106       315        79
WVCT   2025250    200200   15.7400  144.1000       4.6       135       340        83
WVCT   2025250    200200   15.7600  144.0900       4.7       138       335        84
WVCT   2025250    200200   15.7800  143.9200       4.2       144       225        70
WVCT   2025250    200200   15.6500  144.3500       4.9       138       303        70
WVCT   2025250    200200   15.6600  143.7600       5.0       131       193        89
WVCT   2025250    200200   15.7200  143.5100       4.5        86       189        63
WVCT   2025250    200200   15.7200  143.4900       4.7        87       192        64
WVCT   2025250    200200   15.5500  144.4200       4.5       134       287        85
WVCT   2025250    200200   15.6100  144.3300       4.5       141       285        71
WVCT   2025250    200200   15.5900  144.2900       4.5       139       291        60
WVCT   2025250    200200   15.5500  144.2100       4.2       133       276        61
WVCT   2025250    200200   15.5700  143.7900       5.4       133       193        96
WVCT   2025250    200200   15.5500  143.5400       8.2       130       187        81
WVCT   2025250    200200   15.5700  143.5300       8.0       128       195        74
WVCT   2025250    200200   15.4600  144.4000       5.3       134       272        67
WVCT   2025250    200200   15.5300  143.7900       5.4       132       182        75
WVCT   2025250    200200   15.5300  143.5600       8.1       130       184        77
WVCT   2025250    200200   15.4400  142.4400       7.1        55       218        62
WVCT   2025250    200200   15.3800  143.9900       4.4       113       191        81
WVCT   2025250    200200   15.3500  143.5600       8.4        69       182        63
WVCT   2025250    200200   15.4300  142.4200       6.9        57       218        75
WVCT   2025250    200200   15.3400  143.9900       4.4       116       191        74
WVCT   2025250    200200   15.3400  143.5600       8.9        67       182        66
WVCT   2025250    200200   15.2400  144.0300       4.2        97       191        62
WVCT   2025250    200200   15.2000  143.6600       8.2       118       183        80
WVCT   2025250    200200   15.2200  143.5300       8.7        86       183        79
WVCT   2025250    200200   15.0700  143.7000       7.0        98       183        72
WVCT   2025250    200200   15.1100  143.6200       8.1       113       183        80
WVCT   2025250    200200   15.0300  144.3600       5.6       105       231        84
WVCT   2025250    200200   15.0100  144.0700       4.9        76       191        82
WVCT   2025250    200200   15.0500  143.7200       6.9        91       183        65
WVCT   2025250    200200   14.9300  143.7700       8.1        82       183        77
WVCT   2025250    200200   14.8200  144.0700       7.2        56       189        73
WVCT   2025250    200200   14.8400  143.9200       7.6        95       191        79
WVCT   2025250    200200   14.7800  143.8800       7.9        92       191        73
WVCT   2025250    200200   14.8000  143.8000       8.1       100       191        81
WVCT   2025250    200200   14.7600  143.8200       7.7        92       196        77
VIS    2025250    200200   24.1500  152.3400       9.0        92       879        95
VIS    2025250    200200   24.1300  152.2100       6.6       104       912        99
VIS    2025250    200200   24.1300  152.2000       6.5       102       949        97
VIS    2025250    200200   24.1400  152.1700       7.1        92       951        95
VIS    2025250    200200   24.1300  152.1500       7.2        86       840        95
VIS    2025250    200200   24.1100  150.1900       9.9       110       952        90
VIS    2025250    200200   24.1100  150.1800       9.7       109       859        98
VIS    2025250    200200   24.1000  150.1300       8.0       106       921        97
VIS    2025250    200200   24.1000  150.1000       8.0       103       925        92
VIS    2025250    200200   24.1100  150.0300       9.7       119       877        90
VIS    2025250    200200   24.0800  149.9500       9.5       121       845        98
VIS    2025250    200200   24.0800  149.9400       8.9       117       830        99
VIS    2025250    200200   24.0900  149.9000       8.4       112       787        93
VIS    2025250    200200   24.0900  149.8800       8.3       115       784        95
VIS    2025250    200200   24.0900  149.8500       8.4       122       789        96
VIS    2025250    200200   24.0900  149.8400       8.6       123       795        97
VIS    2025250    200200   24.0900  149.8100       9.8       129       795        95
VIS    2025250    200200   24.0800  149.7800      10.0       126       782        92
VIS    2025250    200200   24.0900  149.7400       9.2       122       793        98
VIS    2025250    200200   24.0800  149.7300       9.3       122       793        98
VIS    2025250    200200   24.0900  149.6900       9.7       129       808        90
VIS    2025250    200200   24.0900  149.6800       9.3       129       808        92
VIS    2025250    200200   24.1000  149.6400       9.1       120       811        90
VIS    2025250    200200   24.1000  149.6300       8.5       118       811        91
VIS    2025250    200200   24.1000  149.5900       8.6       130       810        91
VIS    2025250    200200   24.0900  149.3800       8.4       112       906       100
VIS    2025250    200200   24.0700  149.3600       8.2       114       855        99
VIS    2025250    200200   24.0900  149.3300       8.5       112       827        94
VIS    2025250    200200   24.0700  149.3100       8.1       113       815        94
VIS    2025250    200200   24.0900  149.2900       7.9       112       865        99
VIS    2025250    200200   24.0800  149.2700       7.5       115       794        92
VIS    2025250    200200   24.0900  149.2400       6.4       112       823        95
VIS    2025250    200200   24.0800  149.2100       6.3       109       878        95
VIS    2025250    200200   24.0800  149.1900       6.2       108       888        92
VIS    2025250    200200   24.0800  148.8700       7.3       100       977        97
VIS    2025250    200200   24.0900  148.8500       7.5       100       988        97
VIS    2025250    200200   24.0600  148.6000       8.6        99       981        98
VIS    2025250    200200   24.0600  147.2300       9.0        91       979        97
VIS    2025250    200200   24.0600  147.2100       9.2        94       979        91
VIS    2025250    200200   24.0300  146.1100       9.2        83       990        94
VIS    2025250    200200   24.0300  146.0800       9.9        80       990        95
VIS    2025250    200200   24.0300  146.0500      10.3        83       994        95
VIS    2025250    200200   24.0500  145.7700       9.6        91       958        97
VIS    2025250    200200   24.0400  145.7600       9.7        91       934        99
VIS    2025250    200200   24.0200  145.7400       9.7        93       932        99
VIS    2025250    200200   24.0400  145.7000       9.6        94       927        99
VIS    2025250    200200   24.0200  145.6900       9.3        90       955        94
VIS    2025250    200200   24.1000  152.3100       8.2        91       879        98
VIS    2025250    200200   24.1000  152.2900       8.0        89       817        90
VIS    2025250    200200   24.1200  152.2200       6.5       102       879        96
VIS    2025250    200200   24.1100  152.2000       6.0       100       908        99
VIS    2025250    200200   24.0900  152.0500       6.9        90       962        95
VIS    2025250    200200   24.1000  152.0400       6.8        93       963        96
VIS    2025250    200200   24.0600  150.3000       9.1       118       955        91
VIS    2025250    200200   24.0800  150.1500       8.7       114       814        97
VIS    2025250    200200   24.0800  149.9500       9.5       121       859        96
VIS    2025250    200200   24.0600  149.9400       8.5       104       905        98
VIS    2025250    200200   24.0600  149.9100       7.9        98       859        95
VIS    2025250    200200   24.0600  149.8900       7.6       100       850        96
VIS    2025250    200200   24.0600  149.8700       7.4       104       850        96
VIS    2025250    200200   24.0700  149.8400       7.8       116       802        95
VIS    2025250    200200   24.0600  149.8100      10.0       129       795        95
VIS    2025250    200200   24.0800  149.7800      10.0       125       782        92
VIS    2025250    200200   24.0700  149.7500       9.4       122       793        97
VIS    2025250    200200   24.0700  149.7300       9.4       123       793        90
VIS    2025250    200200   24.0500  149.7000       9.9       126       815        91
VIS    2025250    200200   24.0600  149.6800       9.1       129       811        93
VIS    2025250    200200   24.0500  149.6400       8.0       143       815        90
VIS    2025250    200200   24.0600  149.6200       8.3       137       815        94
VIS    2025250    200200   24.0600  149.5900       8.5       126       817        92
VIS    2025250    200200   24.0700  149.5700       8.0       125       817        93
VIS    2025250    200200   24.0500  149.3700       8.0       112       906        99
VIS    2025250    200200   24.0500  149.3400       7.6       111       865        99
VIS    2025250    200200   24.0600  149.3400       7.8       112       855        99
VIS    2025250    200200   24.0500  149.3000       7.7       110       865        96
VIS    2025250    200200   24.0500  149.2600       7.3       112       869        93
VIS    2025250    200200   24.0500  149.2500       7.3       111       875        94
VIS    2025250    200200   24.0600  149.2200       6.8       109       875        96
VIS    2025250    200200   24.0600  148.8900       7.1       100       970        94
VIS    2025250    200200   24.0400  148.6400       9.1        97       992        96
VIS    2025250    200200   24.0500  148.5800       8.8        98       982        98
VIS    2025250    200200   24.0100  146.1800      10.6        95       994        97
VIS    2025250    200200   24.0000  146.1600      10.1        93       994        94
VIS    2025250    200200   24.0000  146.1300       9.6        90       994        96
VIS    2025250    200200   24.0000  146.0900      10.0        83       973        96
VIS    2025250    200200   24.0100  146.0800      10.0        83       982        96
VIS    2025250    200200   24.0000  145.8200      10.1        87       981        91
VIS    2025250    200200   24.0000  145.8000       9.9        89       967        96
VIS    2025250    200200   24.0100  145.7700       9.8        90       964        98
VIS    2025250    200200   24.0100  145.7700       9.8        92       959        99
VIS    2025250    200200   24.0100  145.7200       9.8        95       932       100
VIS    2025250    200200   24.0900  152.3000       8.2        89       847        95
VIS    2025250    200200   24.0800  152.0600       7.0        85       951        94
VIS    2025250    200200   24.0700  152.0400       7.0        89       944        94
VIS    2025250    200200   24.0500  150.3100       9.8       124       911        91
VIS    2025250    200200   24.0400  150.2900       9.8       124       925        90
VIS    2025250    200200   24.0400  150.2800       9.5       122       938        90
VIS    2025250    200200   24.0600  150.1600       8.9       114       882        90
VIS    2025250    200200   24.0500  150.1300       8.1       105       837        95
VIS    2025250    200200   24.0500  149.9500       8.5        99       946        95
VIS    2025250    200200   24.0500  149.9400       8.4       101       946        96
VIS    2025250    200200   24.0500  149.9100       7.9        98       888        94
VIS    2025250    200200   24.0500  149.8900       7.6       101       878        98
VIS    2025250    200200   24.0400  149.8400       8.5       118       851        97
VIS    2025250    200200   24.0500  149.8200       9.6       129       821        97
VIS    2025250    200200   24.0500  149.8000      10.1       130       797        96
VIS    2025250    200200   24.0300  149.7800       9.2       124       793        98
VIS    2025250    200200   24.0400  149.6600       8.0       135       817        96
VIS    2025250    200200   24.0400  149.5800       8.7       126       863        96
VIS    2025250    200200   24.0300  149.4000       8.3       106       978        97
VIS    2025250    200200   24.0400  149.3700       7.9       107       978        96
VIS    2025250    200200   24.0400  149.3500       7.5       107       928        96
VIS    2025250    200200   24.0400  149.3300       7.5       109       865        98
VIS    2025250    200200   24.0400  149.3000       7.4       109       873        95
VIS    2025250    200200   24.0000  146.1800      10.7        93       994        96
VIS    2025250    200200   23.9800  146.1500      10.0        92       987        96
VIS    2025250    200200   23.9800  146.1300       9.6        91       967        98
VIS    2025250    200200   24.0000  146.1000       9.9        85       955        97
VIS    2025250    200200   23.9800  146.0800      10.1        89       944        98
VIS    2025250    200200   23.9900  145.7900       9.9        89       967        96
VIS    2025250    200200   23.9700  145.7700      10.1        91       981        99
VIS    2025250    200200   23.9900  145.7600       9.9        91       961        99
VIS    2025250    200200   23.9700  145.7300      10.1        94       957        99
VIS    2025250    200200   23.9600  144.1500      10.1        93       995        99
VIS    2025250    200200   24.0700  152.3000       8.5        87       817        91
VIS    2025250    200200   24.0600  152.2500       7.2        85       817        95
VIS    2025250    200200   24.0500  152.2200       6.7        90       905        96
VIS    2025250    200200   24.0500  152.0500       7.4        87       908        97
VIS    2025250    200200   24.0500  152.0500       7.3        88       917        96
VIS    2025250    200200   24.0500  152.0200       6.9        93       944        92
VIS    2025250    200200   24.0300  150.3100       9.8       125       938        90
VIS    2025250    200200   24.0100  150.2900       9.1       124       934        92
VIS    2025250    200200   24.0200  150.2700       8.6       118       934        95
VIS    2025250    200200   24.0200  150.2500       8.6       113       973        91
VIS    2025250    200200   24.0300  150.2100       8.1       100       997        91
VIS    2025250    200200   24.0200  150.1800       8.2       104       991        91
VIS    2025250    200200   24.0200  150.1500       8.2       105       922        97
VIS    2025250    200200   24.0200  150.1500       8.1       105       882        99
VIS    2025250    200200   24.0200  149.8500       8.5       117       855        95
VIS    2025250    200200   24.0000  149.8200       9.2       108       854        97
VIS    2025250    200200   24.0000  149.7900       8.9       108       847        97
VIS    2025250    200200   24.0100  149.7700       9.4       117       804        97
VIS    2025250    200200   24.0000  149.7600       9.5       115       814        97
VIS    2025250    200200   24.0100  149.7200       9.9       122       818        90
VIS    2025250    200200   24.0100  149.6800       9.8       123       819        91
VIS    2025250    200200   24.0100  149.6500       8.7       126       836        96
VIS    2025250    200200   24.0000  149.4000       6.9       109       997        92
VIS    2025250    200200   24.0000  149.3700       7.6       104       977        90
VIS    2025250    200200   23.9900  149.3500       7.6       102       965        96
VIS    2025250    200200   23.9900  149.3200       7.7       102       934        97
VIS    2025250    200200   24.0100  149.3100       7.5       105       928        93
VIS    2025250    200200   23.9600  146.4900       9.5        84       999        97
VIS    2025250    200200   23.9500  146.4400      10.0        86       991        97
VIS    2025250    200200   23.9600  146.2000       9.9        92       978        91
VIS    2025250    200200   23.9600  146.2000      10.1        92       978        91
VIS    2025250    200200   23.9500  146.1600      10.4        93       931        97
VIS    2025250    200200   23.9600  146.1400      10.0        94       955        99
VIS    2025250    200200   23.9600  146.1200       9.5        94       918        99
VIS    2025250    200200   23.9700  146.0900       9.7        91       934        99
VIS    2025250    200200   23.9600  146.0500      10.3        89       944        98
VIS    2025250    200200   23.9700  145.7700      10.1        90       981        98
VIS    2025250    200200   23.9600  145.7400      10.0        92       962        99
VIS    2025250    200200   23.9600  145.7300      10.0        93       962        99
VIS    2025250    200200   23.9300  144.1900      10.4        90       989        95
VIS    2025250    200200   23.9300  144.1700      10.2        91       989        98
VIS    2025250    200200   23.9500  144.1300      10.0        94       995        99
VIS    2025250    200200   24.0400  152.3100       8.8        86       894        95
VIS    2025250    200200   24.0400  152.3000       8.6        86       864        99
VIS    2025250    200200   24.0300  152.2700       7.8        84       842        98
VIS    2025250    200200   24.0400  152.2500       7.1        86       856        95
VIS    2025250    200200   24.0400  152.2100       6.5        91       910        95
VIS    2025250    200200   24.0400  152.2000       6.4        92       936        92
VIS    2025250    200200   24.0200  152.0500       7.5        89       944        92
VIS    2025250    200200   24.0200  152.0400       7.5        89       944        92
VIS    2025250    200200   24.0200  152.0100       6.8        90       931        96
VIS    2025250    200200   24.0100  150.2900       9.2       125       934        90
VIS    2025250    200200   24.0000  150.2600       8.1       114       938        97
VIS    2025250    200200   23.9800  150.2300       8.2       106       981        95
VIS    2025250    200200   23.9900  150.2100       8.8       103       982        93
VIS    2025250    200200   24.0000  150.1600       8.2       102       956        95
VIS    2025250    200200   23.9800  149.8700       8.8       116       928        91
VIS    2025250    200200   24.0000  149.8200       9.3       107       855        98
VIS    2025250    200200   24.0000  149.8200       9.2       106       854        97
VIS    2025250    200200   23.9900  149.7800       9.1       105       842        97
VIS    2025250    200200   24.0000  149.7600       9.4       113       814        97
VIS    2025250    200200   23.9800  149.7100       8.9       116       819        92
VIS    2025250    200200   23.9900  149.6700       9.9       118       817        91
VIS    2025250    200200   23.9900  149.6500       9.3       121       817        93
VIS    2025250    200200   23.9800  149.6100       7.9       133       802        94
VIS    2025250    200200   23.9700  149.5900       8.8       137       785        92
VIS    2025250    200200   23.9800  149.4800       6.5       117       965        96
VIS    2025250    200200   23.9900  149.3500       7.6       102       965        97
VIS    2025250    200200   23.9700  149.3200       7.6       100       938        94
VIS    2025250    200200   23.9600  147.4300       8.9        95       996        98
VIS    2025250    200200   23.9400  147.4100       9.4        98       995        97
VIS    2025250    200200   23.9400  147.3700       8.8       101       982        99
VIS    2025250    200200   23.9400  147.2900       8.2       112       986        96
VIS    2025250    200200   23.9400  147.2700       9.3       108       979        98
VIS    2025250    200200   23.9400  147.2400      11.0       106       964        97
VIS    2025250    200200   23.9500  146.5600       9.4        87       982        97
VIS    2025250    200200   23.9400  146.5400      10.2        86       982        95
VIS    2025250    200200   23.9400  146.4500       9.8        86       991        98
VIS    2025250    200200   23.9400  146.4200      10.0        86       978        95
VIS    2025250    200200   23.9400  146.4100       9.9        87       978        97
VIS    2025250    200200   23.9300  146.2400      10.1        90       986        98
VIS    2025250    200200   23.9500  146.2100      10.1        92       978        96
VIS    2025250    200200   23.9300  146.2000      10.3        91       969        97
VIS    2025250    200200   23.9400  146.1700      10.4        92       931        98
VIS    2025250    200200   23.9200  146.1300       9.8        94       907       100
VIS    2025250    200200   23.9200  146.1300       9.7        94       907       100
VIS    2025250    200200   23.9400  146.0800       9.8        93       918       100
VIS    2025250    200200   23.9300  146.0700      10.0        91       936        99
VIS    2025250    200200   23.9200  146.0500      10.0        89       942        98
VIS    2025250    200200   23.9200  145.8500       9.7        88       998        96
VIS    2025250    200200   23.9000  144.2000      10.6        89       989        95
VIS    2025250    200200   23.9100  144.1700      10.3        91       973        99
VIS    2025250    200200   23.9100  144.1400      10.1        93       973        99
VIS    2025250    200200   24.0000  152.2500       6.8        86       936        93
VIS    2025250    200200   24.0000  152.2200       6.6        87       928        96
VIS    2025250    200200   23.9900  152.2100       6.5        86       934        96
VIS    2025250    200200   24.0100  152.0400       7.5        89       945        92
VIS    2025250    200200   23.9900  152.0100       7.3        85       931        94
VIS    2025250    200200   23.9800  150.2700       6.9       109       938        92
VIS    2025250    200200   23.9800  150.2700       7.0       107       964        94
VIS    2025250    200200   23.9700  150.2200       8.3       107       979        94
VIS    2025250    200200   23.9700  150.2000       8.5       105       982        94
VIS    2025250    200200   23.9600  150.1700       8.9       105       952        92
VIS    2025250    200200   23.9600  150.1400       8.1        98       919        98
VIS    2025250    200200   23.9700  149.8600       9.0       114       918        92
VIS    2025250    200200   23.9600  149.8200       9.0       111       884        97
VIS    2025250    200200   23.9600  149.8200       9.0       110       884        97
VIS    2025250    200200   23.9500  149.7900       9.0       110       856        99
VIS    2025250    200200   23.9600  149.7500       8.9       110       826        96
VIS    2025250    200200   23.9600  149.7300       8.9       113       825        91
VIS    2025250    200200   23.9500  149.6900       9.4       119       814        91
VIS    2025250    200200   23.9700  149.6300       8.6       121       794        91
VIS    2025250    200200   23.9500  149.5600       8.9       125       785        92
VIS    2025250    200200   23.9500  149.5300       7.3       127       880        94
VIS    2025250    200200   23.9600  149.5000       6.3       118       910        92
VIS    2025250    200200   23.9600  149.4600       6.7       109       889        94
VIS    2025250    200200   23.9600  149.3300       7.7       102       965        96
VIS    2025250    200200   23.9600  149.3300       7.7       102       965        96
VIS    2025250    200200   23.9200  147.4500       9.2        97       988       100
VIS    2025250    200200   23.9100  147.4200       9.6        96       985       100
VIS    2025250    200200   23.9100  147.4000       9.3        95       979       100
VIS    2025250    200200   23.9200  147.3800       8.7        94       980        99
VIS    2025250    200200   23.9300  147.3600       8.0        95       980        93
VIS    2025250    200200   23.9200  147.3100       8.8       110       986        96
VIS    2025250    200200   23.9200  147.2900       8.4       115       979        92
VIS    2025250    200200   23.9200  147.2600       9.9       110       977        96
VIS    2025250    200200   23.9100  146.4700       9.6        85       991        97
VIS    2025250    200200   23.9200  146.4200      10.1        86       978        97
VIS    2025250    200200   23.9200  146.3500       9.9        86       975        97
VIS    2025250    200200   23.9000  146.2900       9.7        90       974        98
VIS    2025250    200200   23.9000  146.2700       9.8        91       974        96
VIS    2025250    200200   23.9100  146.2300      10.3        92       978        98
VIS    2025250    200200   23.9200  146.2000      10.3        91       957        98
VIS    2025250    200200   23.9200  146.1800      10.4        91       931        99
VIS    2025250    200200   23.9100  146.1500      10.1        91       909        99
VIS    2025250    200200   23.9100  146.1400      10.0        91       907        99
VIS    2025250    200200   23.9000  146.1100      10.0        94       907       100
VIS    2025250    200200   23.9000  146.0400       9.9        88       955        98
VIS    2025250    200200   23.9000  145.8500       9.4        88       990        98
VIS    2025250    200200   23.8900  144.1900      10.6        89       987        96
VIS    2025250    200200   23.8900  144.1900      10.6        89       978        97
VIS    2025250    200200   23.9700  152.2200       6.8        82       934        94
VIS    2025250    200200   23.9700  152.1900       6.5        90       934        94
VIS    2025250    200200   23.9800  152.1800       6.4        91       934        94
VIS    2025250    200200   23.9700  152.0200       7.2        80       945        91
VIS    2025250    200200   23.9700  152.0100       7.2        79       858        96
VIS    2025250    200200   23.9600  151.9800       6.7        75       852        94
VIS    2025250    200200   23.9500  150.2400       7.3       108       979        97
VIS    2025250    200200   23.9400  150.2100       7.8       108       960        96
VIS    2025250    200200   23.9300  150.1900       8.2       106       904        98
VIS    2025250    200200   23.9300  150.1600       8.7       110       883        98
VIS    2025250    200200   23.9400  150.1300       7.6        95       883        98
VIS    2025250    200200   23.9400  150.1100       7.3        84       919        96
VIS    2025250    200200   23.9500  149.8400       9.3       115       918        91
VIS    2025250    200200   23.9500  149.8200       9.0       114       910        93
VIS    2025250    200200   23.9200  149.7800       9.6       109       858        97
VIS    2025250    200200   23.9200  149.7700       9.6       108       856        97
VIS    2025250    200200   23.9300  149.7400       8.8       107       842        98
VIS    2025250    200200   23.9200  149.7100       9.1       115       844        95
VIS    2025250    200200   23.9400  149.5500       8.1       123       787        94
VIS    2025250    200200   23.9200  149.5400       7.1       121       789        96
VIS    2025250    200200   23.9300  149.5100       6.1       117       880        95
VIS    2025250    200200   23.9200  149.4900       6.2       112       862        95
VIS    2025250    200200   23.9300  149.4600       7.7       104       877        91
VIS    2025250    200200   23.8900  147.4400       8.7        90       988        98
VIS    2025250    200200   23.8900  147.4200       9.3        93       979        99
VIS    2025250    200200   23.9000  147.3900       9.1        94       956        99
VIS    2025250    200200   23.9100  147.3800       9.0        93       979        99
VIS    2025250    200200   23.8900  147.3400       9.3        92       982        98
VIS    2025250    200200   23.8900  147.3100       9.4       105       983        98
VIS    2025250    200200   23.9000  147.3100       9.2       108       983        96
VIS    2025250    200200   23.8800  146.4600      10.2        80       985        95
VIS    2025250    200200   23.8800  146.4300      10.2        82       971        96
VIS    2025250    200200   23.8800  146.4200      10.2        83       971        96
VIS    2025250    200200   23.8800  146.3800      10.1        84       977        97
VIS    2025250    200200   23.8800  146.3600      10.1        84       978        96
VIS    2025250    200200   23.8800  146.3300      10.1        83       981        95
VIS    2025250    200200   23.9000  146.2500       9.9        90       973        98
VIS    2025250    200200   23.8800  146.2100      10.0        89       966        96
VIS    2025250    200200   23.8900  146.2000      10.4        90       922        99
VIS    2025250    200200   23.8900  146.1600      10.4        89       910        98
VIS    2025250    200200   23.8800  146.1400      10.5        89       916        96
VIS    2025250    200200   23.8700  145.8500       9.4        87       985        98
VIS    2025250    200200   23.8700  144.1900      10.4        91       978        98
VIS    2025250    200200   23.9400  152.2800       6.6        89       989        92
VIS    2025250    200200   23.9400  152.2700       6.3        86       989        92
VIS    2025250    200200   23.9500  152.2300       6.8        78       944        92
VIS    2025250    200200   23.9500  152.2000       6.8        84       914        93
VIS    2025250    200200   23.9500  152.2000       6.8        86       914        92
VIS    2025250    200200   23.9500  152.0100       7.1        74       852        96
VIS    2025250    200200   23.9500  151.9900       7.2        69       850        93
VIS    2025250    200200   23.9400  151.9700       7.2        66       852        91
VIS    2025250    200200   23.9100  150.2300       8.2       107       904        97
VIS    2025250    200200   23.9100  150.2100       8.3       106       893        99
VIS    2025250    200200   23.9000  150.1800       8.2       107       862       100
VIS    2025250    200200   23.9200  150.1500       8.2       107       881       100
VIS    2025250    200200   23.9200  150.1200       7.5        94       934        98
VIS    2025250    200200   23.9200  150.1200       7.4        92       934        98
VIS    2025250    200200   23.9200  149.8700       7.0       110       975        94
VIS    2025250    200200   23.9200  149.8200       9.3       115       910        90
VIS    2025250    200200   23.9200  149.8200       9.4       115       910        91
VIS    2025250    200200   23.9000  149.7800       9.8       109       864        96
VIS    2025250    200200   23.9000  149.7400       9.2       110       858        97
VIS    2025250    200200   23.9100  149.7200       9.2       113       844        95
VIS    2025250    200200   23.9200  149.7100       9.2       116       856        94
VIS    2025250    200200   23.9100  149.6800       9.6       118       833        90
VIS    2025250    200200   23.9100  149.5600       6.8       121       753        91
VIS    2025250    200200   23.8900  149.5300       5.4       122       808        94
VIS    2025250    200200   23.9100  149.5300       6.1       123       808        99
VIS    2025250    200200   23.9000  149.4900       6.7       112       862        90
VIS    2025250    200200   23.8900  148.6500       9.0        98       994        98
VIS    2025250    200200   23.8600  147.4300       8.4        91       974        97
VIS    2025250    200200   23.8600  147.4200       8.8        92       968        98
VIS    2025250    200200   23.8600  147.3800       8.7        95       967        99
VIS    2025250    200200   23.8600  147.3500       8.8        92       975        97
VIS    2025250    200200   23.8800  147.3300       9.7        96       982        99
VIS    2025250    200200   23.8800  147.3200       9.7        98       982       100
VIS    2025250    200200   23.8600  147.2800      10.1       111       970        90
VIS    2025250    200200   23.8600  146.6400       8.9        93       963        95
VIS    2025250    200200   23.8600  146.4600      10.3        80       985        95
VIS    2025250    200200   23.8700  146.4400      10.2        82       977        96
VIS    2025250    200200   23.8500  146.4000      10.0        82       977        96
VIS    2025250    200200   23.8500  146.3900      10.0        83       977        96
VIS    2025250    200200   23.8500  146.3500      10.2        83       975        96
VIS    2025250    200200   23.8500  146.3300      10.2        84       975        96
VIS    2025250    200200   23.8700  146.2200      10.0        88       969        92
VIS    2025250    200200   23.8700  146.1800      10.7        92       922        94
VIS    2025250    200200   23.8400  144.1900      10.2        91       992        99
VIS    2025250    200200   23.9300  152.2300       7.0        81       922        94
VIS    2025250    200200   23.9400  152.2200       7.0        80       914        94
VIS    2025250    200200   23.9100  152.1900       6.7        85       908        93
VIS    2025250    200200   23.9200  152.1800       6.6        87       910        91
VIS    2025250    200200   23.9300  152.0200       6.7        79       931        93
VIS    2025250    200200   23.9200  152.0000       6.7        76       921        92
VIS    2025250    200200   23.9300  151.9700       7.2        66       852        91
VIS    2025250    200200   23.8900  150.2200       8.6       108       893        97
VIS    2025250    200200   23.8900  150.2000       8.4       108       862       100
VIS    2025250    200200   23.8900  150.1800       8.1       107       862       100
VIS    2025250    200200   23.8800  150.1600       7.4       100       856        98
VIS    2025250    200200   23.8800  150.1200       7.5       101       923        97
VIS    2025250    200200   23.9000  150.1100       7.3        98       934        95
VIS    2025250    200200   23.8900  149.8600       6.5       102       965        98
VIS    2025250    200200   23.8700  149.8400       6.9       104       933        96
VIS    2025250    200200   23.8800  149.8200       8.4       106       933        96
VIS    2025250    200200   23.8900  149.8000       9.7       110       890        95
VIS    2025250    200200   23.8800  149.7800      10.0       110       885        94
VIS    2025250    200200   23.8700  149.7300       9.0       120       858        98
VIS    2025250    200200   23.8800  149.7300       9.2       118       862        98
VIS    2025250    200200   23.8900  149.7000       9.5       120       833        93
VIS    2025250    200200   23.8700  149.6700       8.3       116       803        93
VIS    2025250    200200   23.8700  149.6400       7.6       116       790        94
VIS    2025250    200200   23.8700  149.5800       7.2       108       812        94
VIS    2025250    200200   23.8700  149.5700       6.8       106       817        94
VIS    2025250    200200   23.8900  149.5400       5.5       114       808        94
VIS    2025250    200200   23.8900  149.5000       6.1       119       818        90
VIS    2025250    200200   23.8800  148.6800       8.9        96       995        98
VIS    2025250    200200   23.8700  148.6500       8.9        97       995        98
VIS    2025250    200200   23.8600  147.4400       8.3        90       983        97
VIS    2025250    200200   23.8500  147.4000       9.1        93       968        99
VIS    2025250    200200   23.8400  147.3700       8.5        92       967        96
VIS    2025250    200200   23.8400  147.3500       8.8        95       934        99
VIS    2025250    200200   23.8400  147.3200       9.3       101       926        99
VIS    2025250    200200   23.8400  147.2900       9.6       104       958        97
VIS    2025250    200200   23.8300  147.2300       9.3       100       987       100
VIS    2025250    200200   23.8400  147.1900       8.9       101       969        99
VIS    2025250    200200   23.8400  147.1800       9.1       102       976        98
VIS    2025250    200200   23.8400  146.4000      10.0        82       977        96
VIS    2025250    200200   23.8400  146.3500      10.2        83       975        96
VIS    2025250    200200   23.8200  146.3400      10.2        85       957        97
VIS    2025250    200200   23.8300  146.2000      10.2        89       992        93
VIS    2025250    200200   23.8200  146.1700      10.4        87       991        96
VIS    2025250    200200   23.8200  146.1600      10.3        87       992        95
VIS    2025250    200200   23.8000  144.3500      10.3        88       989        94
VIS    2025250    200200   23.8100  144.2700      10.2        89       994        98
VIS    2025250    200200   23.8100  144.2600      10.2        89       994        96
VIS    2025250    200200   23.8100  144.2200      10.5        87       994        96
VIS    2025250    200200   23.8200  144.2200      10.6        87       997        96
VIS    2025250    200200   23.9100  152.2300       7.2        86       908        94
VIS    2025250    200200   23.9100  152.2100       6.9        86       895        97
VIS    2025250    200200   23.9100  152.1900       6.7        85       895        96
VIS    2025250    200200   23.8900  152.0100       6.6        94       961        97
VIS    2025250    200200   23.8800  151.9900       6.3        90       961        94
VIS    2025250    200200   23.9000  151.9800       6.5        79       956        90
VIS    2025250    200200   23.8700  150.2000       8.3       109       890        97
VIS    2025250    200200   23.8500  150.1800       7.8       108       841        98
VIS    2025250    200200   23.8700  150.1500       7.3       102       865        98
VIS    2025250    200200   23.8600  150.1400       7.4       105       923        97
VIS    2025250    200200   23.8600  150.1000       7.1       102       918        97
VIS    2025250    200200   23.8700  150.0900       7.1       105       905        95
VIS    2025250    200200   23.8700  149.8600       6.5       102       965        99
VIS    2025250    200200   23.8600  149.8300       6.6       105       933        98
VIS    2025250    200200   23.8600  149.8200       7.1       107       933        98
VIS    2025250    200200   23.8600  149.7900       8.6       110       890        97
VIS    2025250    200200   23.8500  149.7700       9.5       111       885        95
VIS    2025250    200200   23.8400  149.7400       9.2       113       883        98
VIS    2025250    200200   23.8500  149.7100       7.6       125       765        91
VIS    2025250    200200   23.8500  149.6600       6.4       115       790        93
VIS    2025250    200200   23.8500  149.6300       6.8       110       803        95
VIS    2025250    200200   23.8400  149.6200       7.1       110       803        93
VIS    2025250    200200   23.8500  149.5800       7.2       107       818        94
VIS    2025250    200200   23.8500  149.5700       6.8       104       823        92
VIS    2025250    200200   23.8300  148.7000       9.6        94       984        97
VIS    2025250    200200   23.8500  148.6800       8.7        97       984        97
VIS    2025250    200200   23.8500  148.6600       8.7        97       981        98
VIS    2025250    200200   23.8100  147.5000       9.1        92       998        93
VIS    2025250    200200   23.8300  147.4600       8.7        93       991        99
VIS    2025250    200200   23.8200  147.4400       8.7        96       982        99
VIS    2025250    200200   23.8100  147.4100       8.6        94       973        99
VIS    2025250    200200   23.8100  147.4100       8.5        93       968        98
VIS    2025250    200200   23.8100  147.3600       9.0        95       917       100
VIS    2025250    200200   23.8100  147.3400       9.3        98       913       100
VIS    2025250    200200   23.8200  147.3300       9.3        99       913        99
VIS    2025250    200200   23.8100  147.3000       9.2        98       955        97
VIS    2025250    200200   23.8200  147.2800       9.2        99       989        96
VIS    2025250    200200   23.8100  147.2500       9.1        93       984        99
VIS    2025250    200200   23.8100  147.2100       8.5        96       963        99
VIS    2025250    200200   23.8100  147.1900       8.7        97       957        99
VIS    2025250    200200   23.8200  147.1800       9.1        99       963        95
VIS    2025250    200200   23.8100  147.1300       9.2        94       980        92
VIS    2025250    200200   23.8200  147.0100       8.1        92       990        93
VIS    2025250    200200   23.8200  146.3800      10.2        83       978        94
VIS    2025250    200200   23.8100  146.3600      10.3        85       975        96
VIS    2025250    200200   23.8100  146.3000      10.1        90       964        98
VIS    2025250    200200   23.8000  146.2000      10.5        88       998        96
VIS    2025250    200200   23.8200  146.1800      10.2        86       991        96
VIS    2025250    200200   23.8200  146.1600      10.1        86       992        96
VIS    2025250    200200   23.8100  146.1400       9.6        87       992        95
VIS    2025250    200200   23.7800  144.3700      10.2        89       988        96
VIS    2025250    200200   23.7800  144.3200      10.4        86       990        96
VIS    2025250    200200   23.7900  144.2800      10.7        88       993        97
VIS    2025250    200200   23.7900  144.2500      10.7        90       993        98
VIS    2025250    200200   23.7900  144.2500      10.7        90       993        98
VIS    2025250    200200   23.8700  152.1800       6.6        87       956        95
VIS    2025250    200200   23.8700  152.1800       6.6        87       956        95
VIS    2025250    200200   23.8800  152.0300       6.5        98       984        97
VIS    2025250    200200   23.8800  152.0000       6.4        95       961        97
VIS    2025250    200200   23.8800  151.9900       6.3        93       978        96
VIS    2025250    200200   23.8800  151.9600       6.3        89       979        93
VIS    2025250    200200   23.8400  150.1900       8.1       110       890        98
VIS    2025250    200200   23.8500  150.1800       7.8       109       841        99
VIS    2025250    200200   23.8300  150.1300       7.0       105       920        98
VIS    2025250    200200   23.8500  150.1100       7.0        99       924        98
VIS    2025250    200200   23.8500  150.1000       7.0        98       918        98
VIS    2025250    200200   23.8400  150.0800       7.1       103       905        94
VIS    2025250    200200   23.8300  150.0500       7.7       116       960        91
VIS    2025250    200200   23.8300  149.8200       8.6       114       941        91
VIS    2025250    200200   23.8200  149.8100       9.0       112       941        91
VIS    2025250    200200   23.8300  149.7700       9.0       111       919        93
VIS    2025250    200200   23.8200  149.7600       9.1       110       885        97
VIS    2025250    200200   23.8400  149.7400       8.7       114       858        97
VIS    2025250    200200   23.8400  149.7100       7.3       122       765        90
VIS    2025250    200200   23.8400  149.6100       7.3       110       817        95
VIS    2025250    200200   23.8200  149.6000       7.2       108       818        94
VIS    2025250    200200   23.8300  149.5800       7.1       106       823        91
VIS    2025250    200200   23.8100  149.4900       7.7       109       936        94
VIS    2025250    200200   23.8200  149.4600       8.5       106       987        95
VIS    2025250    200200   23.8200  149.4300       8.5       105       987        96
VIS    2025250    200200   23.8100  148.7400       9.5        94       985        98
VIS    2025250    200200   23.8200  148.7200       9.7        94       985        97
VIS    2025250    200200   23.7900  147.6000      10.6        99       992        99
VIS    2025250    200200   23.7900  147.5700       9.8        96       977        98
VIS    2025250    200200   23.8000  147.5600       9.3        95       978        96
VIS    2025250    200200   23.8100  147.5400       9.0        97       998        99
VIS    2025250    200200   23.8000  147.5000       9.5        96       998        99
VIS    2025250    200200   23.7900  147.4700       9.3        91       984        99
VIS    2025250    200200   23.7900  147.4500       9.1        92       984        99
VIS    2025250    200200   23.8100  147.4400       8.9        94       982        99
VIS    2025250    200200   23.7800  147.4000       8.7        95       951        99
VIS    2025250    200200   23.7800  147.3800       9.1        99       920       100
VIS    2025250    200200   23.8000  147.3500       9.4        99       913        99
VIS    2025250    200200   23.7800  147.3200       9.4        97       950        98
VIS    2025250    200200   23.8000  147.3000       9.2        97       952        97
VIS    2025250    200200   23.7900  147.2700       9.2        90       994        98
VIS    2025250    200200   23.7800  147.2600       9.1        89       984        98
VIS    2025250    200200   23.7900  147.2100       8.4        95       948       100
VIS    2025250    200200   23.7800  147.2000       8.4        94       920        99
VIS    2025250    200200   23.8000  147.1800       8.8        96       957        97
VIS    2025250    200200   23.7800  147.1500       9.4        95       957        97
VIS    2025250    200200   23.7800  147.1300       9.2        96       970        98
VIS    2025250    200200   23.7900  146.9800       8.1        96       968        99
VIS    2025250    200200   23.7900  146.9800       8.3        94       968        99
VIS    2025250    200200   23.7800  146.4300      10.4        88       993        97
VIS    2025250    200200   23.7700  146.4100      10.6        92       988        98
VIS    2025250    200200   23.7800  146.3700      11.1        94       974        96
VIS    2025250    200200   23.7800  146.3600      11.0        95       974        95
VIS    2025250    200200   23.7700  146.3200      10.7        95       974        98
VIS    2025250    200200   23.7700  146.3000      10.1        92       946        99
VIS    2025250    200200   23.7700  146.2700       9.5        90       946        99
VIS    2025250    200200   23.7700  146.2600       9.3        92       946       100
VIS    2025250    200200   23.7700  146.1700      10.8        96       953        98
VIS    2025250    200200   23.7800  146.1400       9.5        93       990        99
VIS    2025250    200200   23.7700  146.1100       9.4        90       948        99
VIS    2025250    200200   23.7700  146.1100       9.4        90       948        98
VIS    2025250    200200   23.7700  144.3700      10.1        89       988        98
VIS    2025250    200200   23.7600  144.3600      10.2        89       988        95
VIS    2025250    200200   23.7700  144.3100      10.4        86       993        93
VIS    2025250    200200   23.7500  144.2600      11.1        92       989        97
VIS    2025250    200200   23.7500  144.2400      11.2        92       980        98
VIS    2025250    200200   23.7600  144.2100      10.8        91       979        98
VIS    2025250    200200   23.8300  152.0100       6.3        86       978        96
VIS    2025250    200200   23.8300  151.9900       6.4        87       978        96
VIS    2025250    200200   23.8300  151.9600       6.3        87       973        96
VIS    2025250    200200   23.8300  151.9600       6.3        87       973        96
VIS    2025250    200200   23.8200  150.1900       8.3       112       917        91
VIS    2025250    200200   23.8000  150.1600       7.8       111       908        97
VIS    2025250    200200   23.8100  150.1400       7.0       101       908        99
VIS    2025250    200200   23.8100  150.1300       7.0       101       908        99
VIS    2025250    200200   23.8000  150.0900       7.0        98       891        94
VIS    2025250    200200   23.8200  150.0500       7.1       111       960        90
VIS    2025250    200200   23.8000  149.7900       9.6       114       919        91
VIS    2025250    200200   23.8100  149.7600       9.0       110       900        95
VIS    2025250    200200   23.8100  149.6200       5.7       114       788        90
VIS    2025250    200200   23.8100  149.5900       7.1       110       818        92
VIS    2025250    200200   23.8000  149.5100       7.0       111       905        90
VIS    2025250    200200   23.7900  149.4800       6.5       107       936        95
VIS    2025250    200200   23.8000  149.4400       8.1       104       986        96
VIS    2025250    200200   23.7900  149.4200       8.0       102       986        95
VIS    2025250    200200   23.7900  149.4000       7.9       102       985        95
VIS    2025250    200200   23.7700  147.6700       9.9       101       982        99
VIS    2025250    200200   23.7600  147.6400       9.9        98       982       100
VIS    2025250    200200   23.7600  147.6200      10.7        99       982        99
VIS    2025250    200200   23.7600  147.5800      10.6        98       970        99
VIS    2025250    200200   23.7800  147.5700      10.0        97       974        99
VIS    2025250    200200   23.7700  147.5400       9.6        97       970       100
VIS    2025250    200200   23.7600  147.5200      10.5       104       962        98
VIS    2025250    200200   23.7800  147.5000      10.3       101       964        99
VIS    2025250    200200   23.7800  147.4600       9.0        92       984        99
VIS    2025250    200200   23.7700  147.4300       8.7        93       975        99
VIS    2025250    200200   23.7600  147.4200       8.8        93       971        98
VIS    2025250    200200   23.7700  147.3900       9.2        98       926       100
VIS    2025250    200200   23.7800  147.3500       9.6       101       919        99
VIS    2025250    200200   23.7600  147.3200       9.6        97       950        97
VIS    2025250    200200   23.7700  147.3100       9.6        95       960        96
VIS    2025250    200200   23.7800  147.2900       9.2        91       978        97
VIS    2025250    200200   23.7600  147.2500       8.7        91       951        98
VIS    2025250    200200   23.7600  147.2400       8.7        91       942        98
VIS    2025250    200200   23.7600  147.2000       8.7        93       906        99
VIS    2025250    200200   23.7600  147.1900       8.7        95       920        99
VIS    2025250    200200   23.7600  147.1600       9.1        96       935        99
VIS    2025250    200200   23.7600  147.1200       8.6        98       935       100
VIS    2025250    200200   23.7700  147.1100       8.3       101       944        99
VIS    2025250    200200   23.7700  147.0800       7.4       107       980        90
VIS    2025250    200200   23.7600  146.9900       8.0       105       976        93
VIS    2025250    200200   23.7600  146.9800       8.2       104       968        96
VIS    2025250    200200   23.7600  146.4300      10.8        89       993        97
VIS    2025250    200200   23.7500  146.4300      10.8        91       993        98
VIS    2025250    200200   23.7500  146.3800      10.9        97       962        98
VIS    2025250    200200   23.7500  146.3800      10.8        97       954        98
VIS    2025250    200200   23.7400  146.3300      10.4        94       927        97
VIS    2025250    200200   23.7600  146.3100      10.0        93       946        99
VIS    2025250    200200   23.7700  146.3000      10.0        92       946        99
VIS    2025250    200200   23.7600  146.2800       9.5        90       946        99
VIS    2025250    200200   23.7600  146.2300      10.1        96       956        97
VIS    2025250    200200   23.7500  146.2200       9.9        96       956        98
VIS    2025250    200200   23.7500  146.1900      10.4        96       953        98
VIS    2025250    200200   23.7500  146.1700      10.8        96       900        99
VIS    2025250    200200   23.7600  146.1500      10.2        94       931        99
VIS    2025250    200200   23.7600  146.1100       9.5        91       931        99
VIS    2025250    200200   23.7600  146.1000       9.6        89       931        96
VIS    2025250    200200   23.7400  145.5800      10.6        89       987        97
VIS    2025250    200200   23.7400  145.5600      10.8        90       989        98
VIS    2025250    200200   23.7400  145.5500      10.8        91       989        99
VIS    2025250    200200   23.7400  145.5100      10.2        93       989        98
VIS    2025250    200200   23.7400  145.4900       9.8        93       975        97
VIS    2025250    200200   23.7400  144.3300      10.4        90       990        97
VIS    2025250    200200   23.7400  144.3200      10.4        91       990        98
VIS    2025250    200200   23.7400  144.2800      10.8        93       997        98
VIS    2025250    200200   23.7400  144.2700      11.0        92       994        97
VIS    2025250    200200   23.7400  144.2300      11.1        92       968        98
VIS    2025250    200200   23.7200  143.7500      10.1        98       992        99
VIS    2025250    200200   23.7300  143.5600      10.4        97       994        98
VIS    2025250    200200   23.8200  152.4300       6.7        91       995        92
VIS    2025250    200200   23.8300  152.0400       6.5        82       999        93
VIS    2025250    200200   23.8100  152.0200       6.9        83       942        90
VIS    2025250    200200   23.8300  152.0000       6.4        86       975        96
VIS    2025250    200200   23.8200  151.9700       6.7        86       951        95
VIS    2025250    200200   23.8300  151.9500       6.5        87       967        96
VIS    2025250    200200   23.8000  151.9300       6.6        89       940        97
VIS    2025250    200200   23.8000  151.2700       7.3        98       999        98
VIS    2025250    200200   23.8000  151.2500       7.9        96       941        97
VIS    2025250    200200   23.8000  151.2200       7.6        99       954        94
VIS    2025250    200200   23.7900  150.1600       8.3       112       917        94
VIS    2025250    200200   23.7700  150.1400       8.1       107       934        94
VIS    2025250    200200   23.7900  150.1300       7.1       100       908       100
VIS    2025250    200200   23.7900  150.0900       7.1       100       891        97
VIS    2025250    200200   23.7800  150.0600       8.6       116       872        95
VIS    2025250    200200   23.7700  150.0400      10.1       124       856        93
VIS    2025250    200200   23.7700  149.9300      10.6       108       908        90
VIS    2025250    200200   23.7700  149.9200      10.7       106       908        91
VIS    2025250    200200   23.7700  149.8100      10.2       112       865        96
VIS    2025250    200200   23.7700  149.7700       9.5       111       865        98
VIS    2025250    200200   23.7800  149.7500       9.0       112       833        96
VIS    2025250    200200   23.7900  149.7400       8.8       112       817        92
VIS    2025250    200200   23.7900  149.6200       5.9       126       774        93
VIS    2025250    200200   23.7800  149.6100       6.7       122       776        94
VIS    2025250    200200   23.7700  149.5600       7.5       118       808        90
VIS    2025250    200200   23.7700  149.5600       7.3       118       808        90
VIS    2025250    200200   23.7600  149.5300       6.1       113       869        97
VIS    2025250    200200   23.7700  149.4900       5.2       104       905        92
VIS    2025250    200200   23.7800  149.4800       6.0       106       936        94
VIS    2025250    200200   23.7600  149.4500       5.8       111       948        95
VIS    2025250    200200   23.7700  149.4200       7.6       100       974        96
VIS    2025250    200200   23.7800  149.4000       7.8       101       985        96
VIS    2025250    200200   23.7400  147.6900       9.5        94       989        99
VIS    2025250    200200   23.7400  147.6700       9.3        97       977       100
VIS    2025250    200200   23.7500  147.6400       9.6        98       982       100
VIS    2025250    200200   23.7300  147.6200      10.3        99       951        98
VIS    2025250    200200   23.7600  147.5900      11.2        96       967        93
VIS    2025250    200200   23.7400  147.5700      10.8        98       963        96
VIS    2025250    200200   23.7300  147.5300      10.2       103       947        98
VIS    2025250    200200   23.7400  147.5300      10.4       104       957        97
VIS    2025250    200200   23.7500  147.5000      11.2       106       962        94
VIS    2025250    200200   23.7300  147.4600       9.4        97       969        99
VIS    2025250    200200   23.7300  147.4500       9.3        96       969        98
VIS    2025250    200200   23.7500  147.4200       8.8        93       971        98
VIS    2025250    200200   23.7300  147.3800       9.1        94       926        99
VIS    2025250    200200   23.7500  147.3700       9.4       100       925       100
VIS    2025250    200200   23.7400  147.3400       9.3        95       941        95
VIS    2025250    200200   23.7500  147.3200       9.5        95       960        96
VIS    2025250    200200   23.7300  147.2800       8.5        90       955        98
VIS    2025250    200200   23.7500  147.2600       8.7        92       951        99
VIS    2025250    200200   23.7300  147.2300       8.5        95       902        98
VIS    2025250    200200   23.7400  147.2200       8.7        95       902        98
VIS    2025250    200200   23.7300  147.1900       9.0        97       901        99
VIS    2025250    200200   23.7400  147.1700       8.9        97       906        98
VIS    2025250    200200   23.7400  147.1400       9.0        98       916        97
VIS    2025250    200200   23.7400  147.1100       8.6        98       914        98
VIS    2025250    200200   23.7300  147.0800       7.9        97       914        97
VIS    2025250    200200   23.7300  147.0600       7.9        96       921        98
VIS    2025250    200200   23.7300  147.0300       7.9        92       964        97
VIS    2025250    200200   23.7400  146.9900       8.0       104       972        96
VIS    2025250    200200   23.7400  146.4600      10.9        90       993        99
VIS    2025250    200200   23.7300  146.4300      10.9        93       980        99
VIS    2025250    200200   23.7300  146.4000      10.6        94       955        99
VIS    2025250    200200   23.7200  146.3600      10.2        94       924        98
VIS    2025250    200200   23.7200  146.3400       9.9        93       913        94
VIS    2025250    200200   23.7200  146.3200       9.5        93       904        97
VIS    2025250    200200   23.7300  146.2900       9.0        91       902        98
VIS    2025250    200200   23.7400  146.2600       9.8        94       887        97
VIS    2025250    200200   23.7400  146.2500      10.3        96       887        96
VIS    2025250    200200   23.7300  146.2100      10.0        98       898        99
VIS    2025250    200200   23.7400  146.1900      10.2        97       898       100
VIS    2025250    200200   23.7400  146.1700      10.7        96       895        99
VIS    2025250    200200   23.7200  146.1300      10.0        96       886       100
VIS    2025250    200200   23.7200  146.1200      10.0        97       894       100
VIS    2025250    200200   23.7300  146.0900      10.0        94       923        98
VIS    2025250    200200   23.7300  145.5500      10.7        90       989        99
VIS    2025250    200200   23.7100  145.5200      10.3        91       977       100
VIS    2025250    200200   23.7300  145.5000      10.1        93       977        98
VIS    2025250    200200   23.7100  145.4600       9.3        93       975        96
VIS    2025250    200200   23.7100  145.4500       9.3        93       975        96
VIS    2025250    200200   23.7000  144.3600      10.8        93       995        99
VIS    2025250    200200   23.7000  144.3500      11.0        93       995        99
VIS    2025250    200200   23.7100  144.3100      10.6        94       995       100
VIS    2025250    200200   23.7100  144.2800      10.5        92       989       100
VIS    2025250    200200   23.7000  144.2500      10.5        91       971       100
VIS    2025250    200200   23.7100  143.7600      10.3        96       969        91
VIS    2025250    200200   23.7000  143.6300      10.1        96       992       100
VIS    2025250    200200   23.8100  152.4300       5.1        87       997        93
VIS    2025250    200200   23.7900  152.1600       5.7        94       998        94
VIS    2025250    200200   23.7900  152.1500       5.6        94       998        92
VIS    2025250    200200   23.7800  152.1200       6.2        95       998        92
VIS    2025250    200200   23.7800  152.0100       6.8        85       939        93
VIS    2025250    200200   23.7800  151.9800       6.8        87       893        96
VIS    2025250    200200   23.7800  151.9500       6.9        88       916        96
VIS    2025250    200200   23.8000  151.9300       6.8        89       938        96
VIS    2025250    200200   23.7700  151.2400       7.6       108       941        98
VIS    2025250    200200   23.7800  151.2200       8.0       102       941        95
VIS    2025250    200200   23.7500  150.2200       7.5        95       988        95
VIS    2025250    200200   23.7500  150.2000       8.3        97       964        95
VIS    2025250    200200   23.7500  150.1800       8.7       103       964        93
VIS    2025250    200200   23.7500  150.1400       8.9       113       952        91
VIS    2025250    200200   23.7700  150.1400       8.4       109       946        93
VIS    2025250    200200   23.7500  150.1000       7.5       104       942        97
VIS    2025250    200200   23.7600  150.0800       7.6       110       899        98
VIS    2025250    200200   23.7700  150.0600       9.1       118       872        95
VIS    2025250    200200   23.7700  150.0400      10.4       125       856        91
VIS    2025250    200200   23.7400  149.9300      11.3       108       877        91
VIS    2025250    200200   23.7400  149.8300      11.3       114       876        92
VIS    2025250    200200   23.7600  149.7900      10.0       110       855        97
VIS    2025250    200200   23.7600  149.7700       9.6       111       833        96
VIS    2025250    200200   23.7600  149.6500       6.3       120       744        92
VIS    2025250    200200   23.7600  149.5600       7.7       118       807        93
VIS    2025250    200200   23.7600  149.5300       6.5       114       838        98
VIS    2025250    200200   23.7400  149.5100       5.4       113       838        95
VIS    2025250    200200   23.7600  149.4900       5.4       104       878        91
VIS    2025250    200200   23.7400  149.4400       4.4       125       883        90
VIS    2025250    200200   23.7600  149.4000       6.9       102       941        94
VIS    2025250    200200   23.7300  147.6900       9.4        95       989        99
VIS    2025250    200200   23.7300  147.6700       9.2        96       977       100
VIS    2025250    200200   23.7100  147.6400       8.6        95       941        99
VIS    2025250    200200   23.7100  147.6200       9.4        99       933       100
VIS    2025250    200200   23.7100  147.6000      10.3       100       950        97
VIS    2025250    200200   23.7100  147.5600      10.4       102       947        98
VIS    2025250    200200   23.7100  147.5400      10.2       103       929        97
VIS    2025250    200200   23.7100  147.5200       9.9       103       922        96
VIS    2025250    200200   23.7100  147.4900      10.2        98       922        99
VIS    2025250    200200   23.7200  147.4600      10.0        97       949        99
VIS    2025250    200200   23.7200  147.4400       9.5        95       949        99
VIS    2025250    200200   23.7200  147.4000       9.0        92       940       100
VIS    2025250    200200   23.7200  147.3900       8.9        92       931        99
VIS    2025250    200200   23.7200  147.3500       8.7        91       958        91
VIS    2025250    200200   23.7300  147.3500       8.8        91       958        90
VIS    2025250    200200   23.7100  147.3000       8.1        84       956        97
VIS    2025250    200200   23.7100  147.2900       8.2        86       956        97
VIS    2025250    200200   23.7000  147.2600       8.4        90       900        97
VIS    2025250    200200   23.7200  147.2300       8.4        94       900        97
VIS    2025250    200200   23.7200  147.2100       8.8        96       899        99
VIS    2025250    200200   23.7200  147.1900       9.0        97       900        99
VIS    2025250    200200   23.7200  147.1600       9.1        97       905        97
VIS    2025250    200200   23.7000  147.1300       8.7        92       902        91
VIS    2025250    200200   23.7000  147.0900       8.8        92       903        97
VIS    2025250    200200   23.7200  147.0700       8.0        95       914        98
VIS    2025250    200200   23.7100  147.0600       8.3        93       911        98
VIS    2025250    200200   23.7200  147.0200       7.9        93       964        97
VIS    2025250    200200   23.7200  147.0100       7.9        94       964        97
VIS    2025250    200200   23.7000  146.9900       8.1        95       964        92
VIS    2025250    200200   23.7000  146.4400      11.3        94       993        98
VIS    2025250    200200   23.7100  146.4100      10.9        94       955        99
VIS    2025250    200200   23.7000  146.3800      10.4        90       924        99
VIS    2025250    200200   23.7100  146.3600      10.1        92       924        98
VIS    2025250    200200   23.7100  146.3400       9.6        91       904        94
VIS    2025250    200200   23.7000  146.3100       9.8        91       855        95
VIS    2025250    200200   23.7000  146.2100      10.2        97       863        98
VIS    2025250    200200   23.7000  146.1800       9.7        95       863        98
VIS    2025250    200200   23.6900  146.1600       9.9        96       873        98
VIS    2025250    200200   23.7000  146.1400      10.1        96       883        99
VIS    2025250    200200   23.7100  146.1200      10.0        96       894       100
VIS    2025250    200200   23.7000  146.1000      10.2        95       926        99
VIS    2025250    200200   23.7000  145.5500      10.6        90       987        95
VIS    2025250    200200   23.6800  145.5300       9.9        92       962        98
VIS    2025250    200200   23.7000  145.5200      10.1        91       951       100
VIS    2025250    200200   23.7000  145.4900       9.8        91       948        99
VIS    2025250    200200   23.7000  145.4700       9.6        92       959        98
VIS    2025250    200200   23.6900  145.4300       9.1        93       985        93
VIS    2025250    200200   23.6800  145.4100       9.2        92       981        97
VIS    2025250    200200   23.6700  144.5300      10.0        90      1000       100
VIS    2025250    200200   23.6900  144.4900       9.9        89       991        97
VIS    2025250    200200   23.6700  144.4500      10.2        88       992        99
VIS    2025250    200200   23.6700  144.4400      10.3        89       992       100
VIS    2025250    200200   23.6700  144.3900      10.2        91       992        98
VIS    2025250    200200   23.6900  144.3400      10.9        94       995       100
VIS    2025250    200200   23.6700  144.3000      10.8        91       989        99
VIS    2025250    200200   23.6700  144.2700      10.4        91       989        99
VIS    2025250    200200   23.6700  144.2700      10.4        91       990        99
VIS    2025250    200200   23.6700  143.7600      10.3        95       988       100
VIS    2025250    200200   23.6700  143.5900      10.4        96       992        93
VIS    2025250    200200   23.6600  142.5700      10.5        91       996        99
VIS    2025250    200200   23.7700  152.3900       7.1       103       996        91
VIS    2025250    200200   23.7600  152.1700       6.3        99       989        96
VIS    2025250    200200   23.7700  152.0900       6.4        98       978        97
VIS    2025250    200200   23.7600  152.0800       6.5        98       978        97
VIS    2025250    200200   23.7600  152.0600       5.8        95       998        99
VIS    2025250    200200   23.7500  152.0100       6.7        81       945        94
VIS    2025250    200200   23.7700  152.0100       6.7        84       939        93
VIS    2025250    200200   23.7500  151.9700       6.2        83       931        95
VIS    2025250    200200   23.7700  151.9500       6.7        87       916        98
VIS    2025250    200200   23.7700  151.9200       6.9        89       938        95
VIS    2025250    200200   23.7400  150.2000       7.8        98       964        97
VIS    2025250    200200   23.7400  150.1100       7.7       106       946        95
VIS    2025250    200200   23.7400  150.0900       7.6       103       946        96
VIS    2025250    200200   23.7200  150.0600       7.9       102       910        99
VIS    2025250    200200   23.7200  150.0400       8.7       108       884        99
VIS    2025250    200200   23.7300  149.9500      10.6       113       877        92
VIS    2025250    200200   23.7400  149.9300      11.3       107       877        91
VIS    2025250    200200   23.7200  149.8700      12.0       108       882        90
VIS    2025250    200200   23.7400  149.8400      11.9       111       877        90
VIS    2025250    200200   23.7200  149.8100      10.0       113       874        96
VIS    2025250    200200   23.7300  149.8000       9.7       111       870        97
VIS    2025250    200200   23.7100  149.7700       8.8       100       862        94
VIS    2025250    200200   23.7200  149.5600       6.8       114       804        94
VIS    2025250    200200   23.7300  149.5300       5.5       115       807        98
VIS    2025250    200200   23.7200  149.5100       5.2       117       806        97
VIS    2025250    200200   23.7300  149.4900       6.1       112       877        92
VIS    2025250    200200   23.7100  149.4600       5.4       115       800        90
VIS    2025250    200200   23.7200  148.7500       9.2        93       988        98
VIS    2025250    200200   23.6800  147.6900       8.8       101       985        98
VIS    2025250    200200   23.6800  147.6800       8.7        99       977        98
VIS    2025250    200200   23.7000  147.6500       8.3        94       941        99
VIS    2025250    200200   23.7000  147.6200       9.3       100       931        99
VIS    2025250    200200   23.6800  147.5900      10.2       101       924        98
VIS    2025250    200200   23.6900  147.5700      10.6       102       933        98
VIS    2025250    200200   23.6900  147.5400      10.5       105       924        96
VIS    2025250    200200   23.7000  147.5200       9.9       103       922        97
VIS    2025250    200200   23.6900  147.4900       9.7        97       898        98
VIS    2025250    200200   23.6900  147.4600      10.2        95       913        99
VIS    2025250    200200   23.6900  147.4500      10.2        95       913        99
VIS    2025250    200200   23.6800  147.4200       9.9        91       940        99
VIS    2025250    200200   23.7000  147.4000       9.0        90       932        98
VIS    2025250    200200   23.6800  147.3700       8.8        90       923        95
VIS    2025250    200200   23.6900  147.3300       8.2        82       958        96
VIS    2025250    200200   23.6800  147.3100       8.3        85       928        96
VIS    2025250    200200   23.6900  147.3000       8.0        84       928        96
VIS    2025250    200200   23.7000  147.2600       8.4        90       899        96
VIS    2025250    200200   23.6900  147.2300       8.8        96       896        98
VIS    2025250    200200   23.6800  147.2000       9.2       101       897       100
VIS    2025250    200200   23.6800  147.1900       9.4       101       897       100
VIS    2025250    200200   23.6900  147.1500       9.3        93       899        97
VIS    2025250    200200   23.7000  147.1400       9.1        93       902        95
VIS    2025250    200200   23.6800  147.1200       8.9        88       899        91
VIS    2025250    200200   23.6800  147.0800       8.9        95       900        97
VIS    2025250    200200   23.7000  147.0600       8.7        94       903        97
VIS    2025250    200200   23.7000  147.0200       8.2        91       910        97
VIS    2025250    200200   23.7000  147.0200       8.1        92       921        97
VIS    2025250    200200   23.6700  146.9800       8.4        91       928        96
VIS    2025250    200200   23.6800  146.9500       9.1        88       984        97
VIS    2025250    200200   23.6900  146.4200      11.2        93       964        98
VIS    2025250    200200   23.6900  146.4000      11.2        91       955        99
VIS    2025250    200200   23.6800  146.3800      10.6        87       918        97
VIS    2025250    200200   23.6700  146.2100      10.7        91       877        97
VIS    2025250    200200   23.6700  146.2000      10.6        92       885        98
VIS    2025250    200200   23.6900  146.1600       9.9        96       879        98
VIS    2025250    200200   23.6900  146.1500      10.0        96       880        98
VIS    2025250    200200   23.6600  146.1100      10.7        96       910        99
VIS    2025250    200200   23.6700  146.0900      10.7        93       924        99
VIS    2025250    200200   23.6600  145.5600      11.7        93       972        98
VIS    2025250    200200   23.6600  145.5400      11.0        94       972        99
VIS    2025250    200200   23.6700  145.5300      10.1        94       972        99
VIS    2025250    200200   23.6600  145.4900      10.7        97       945        97
VIS    2025250    200200   23.6800  145.4700      10.2        93       935        99
VIS    2025250    200200   23.6700  145.4400       9.4        92       959        98
VIS    2025250    200200   23.6600  145.4200       9.3        91       950        99
VIS    2025250    200200   23.6600  145.3900       9.3        88       972        98
VIS    2025250    200200   23.6700  144.5300      10.0        90      1000       100
VIS    2025250    200200   23.6600  144.5000      10.1        90       991       100
VIS    2025250    200200   23.6600  144.4900      10.1        89       991       100
VIS    2025250    200200   23.6600  144.4500      10.3        88       991       100
VIS    2025250    200200   23.6700  144.4400      10.3        89       992       100
VIS    2025250    200200   23.6600  144.3500      10.7        93       995        99
VIS    2025250    200200   23.6500  144.3200      10.8        93       989        98
VIS    2025250    200200   23.6500  144.3100      11.0        93       989        99
VIS    2025250    200200   23.6700  144.2700      10.5        92       989       100
VIS    2025250    200200   23.6400  143.7500      10.4        96       989        98
VIS    2025250    200200   23.6600  143.7200      10.0        96       986        99
VIS    2025250    200200   23.6600  143.5900      10.6        97       992        92
VIS    2025250    200200   23.6500  143.5700      11.0       100       992        96
VIS    2025250    200200   23.6500  142.5700      10.4        92       983       100
VIS    2025250    200200   23.6400  142.5400      10.2        94       976        98
VIS    2025250    200200   23.7500  152.0800       6.7        98       978        97
VIS    2025250    200200   23.7400  152.0800       6.8        97       978        96
VIS    2025250    200200   23.7300  152.0300       7.4        82       947        92
VIS    2025250    200200   23.7500  152.0000       6.7        81       901        96
VIS    2025250    200200   23.7300  151.9800       6.3        81       946        93
VIS    2025250    200200   23.7500  151.9700       6.1        82       946        93
VIS    2025250    200200   23.7400  151.9300       6.4        83       938        95
VIS    2025250    200200   23.7000  150.2100       7.6        98       990        97
VIS    2025250    200200   23.6900  150.0900       7.4       106       953        90
VIS    2025250    200200   23.7100  150.0600       8.1       100       910        98
VIS    2025250    200200   23.7100  150.0500       8.5       104       907        98
VIS    2025250    200200   23.6900  150.0000       9.0       113       888        96
VIS    2025250    200200   23.6900  149.9800       8.9       111       877        96
VIS    2025250    200200   23.7100  149.9700      10.3       120       875        92
VIS    2025250    200200   23.7100  149.9300      10.2        99       884        94
VIS    2025250    200200   23.6900  149.9000      10.8       101       886        92
VIS    2025250    200200   23.7100  149.8800      11.9       107       882        90
VIS    2025250    200200   23.6900  149.8500       9.9       110       876        95
VIS    2025250    200200   23.7100  149.8200       9.9       113       875        96
VIS    2025250    200200   23.7100  149.8100       9.6       111       874        98
VIS    2025250    200200   23.7000  149.7700       8.1        94       863        92
VIS    2025250    200200   23.6900  149.7600       8.6        95       860        92
VIS    2025250    200200   23.7100  149.5500       6.2       117       800        97
VIS    2025250    200200   23.6900  149.5000       5.1       116       801        90
VIS    2025250    200200   23.6600  147.8000       8.1        90       990        97
VIS    2025250    200200   23.6700  147.7700       8.6        85       996        97
VIS    2025250    200200   23.6600  147.7400       8.4        90       996        98
VIS    2025250    200200   23.6600  147.7300       8.6        91       986        99
VIS    2025250    200200   23.6800  147.6800       8.9       100       963        98
VIS    2025250    200200   23.6600  147.6700       8.6       103       963        98
VIS    2025250    200200   23.6700  147.6400       8.2        97       912        99
VIS    2025250    200200   23.6600  147.6100       9.8       101       904        99
VIS    2025250    200200   23.6600  147.5800      10.6        99       917        98
VIS    2025250    200200   23.6800  147.5700      10.7       100       924        98
VIS    2025250    200200   23.6800  147.5400      10.5       105       917        97
VIS    2025250    200200   23.6600  147.5000       9.8       102       897        96
VIS    2025250    200200   23.6800  147.5000       9.7        98       898        96
VIS    2025250    200200   23.6500  147.4500      10.0        96       903        97
VIS    2025250    200200   23.6800  147.4400      10.1        94       913        99
VIS    2025250    200200   23.6700  147.4100       9.8        91       940        99
VIS    2025250    200200   23.6600  147.3900       9.7        92       914        99
VIS    2025250    200200   23.6700  147.3700       9.0        89       914        96
VIS    2025250    200200   23.6600  147.3300       8.9        88       919        98
VIS    2025250    200200   23.6700  147.3100       8.4        86       923        96
VIS    2025250    200200   23.6700  147.2700       8.7        89       898        95
VIS    2025250    200200   23.6700  147.2600       8.6        89       898        95
VIS    2025250    200200   23.6700  147.2400       9.1        94       896        99
VIS    2025250    200200   23.6700  147.1900       9.4       101       897       100
VIS    2025250    200200   23.6600  147.1800       9.9       100       898        99
VIS    2025250    200200   23.6500  147.1500       9.7        94       898        99
VIS    2025250    200200   23.6700  147.1400       9.3        88       899        95
VIS    2025250    200200   23.6500  147.1000       9.1        93       899        90
VIS    2025250    200200   23.6500  147.0800       8.7        97       900        96
VIS    2025250    200200   23.6500  147.0400       9.1        96       900        99
VIS    2025250    200200   23.6500  147.0200       9.0        91       901        97
VIS    2025250    200200   23.6500  146.9900       8.4        89       906        97
VIS    2025250    200200   23.6500  146.9700       8.5        90       928        98
VIS    2025250    200200   23.6600  146.9600       9.1        90       967        99
VIS    2025250    200200   23.6500  146.9200      10.0        86       981        99
VIS    2025250    200200   23.6600  146.4100      11.1        95       964        92
VIS    2025250    200200   23.6600  146.3800      10.9        86       918        95
VIS    2025250    200200   23.6600  146.3100      10.3        92       855        92
VIS    2025250    200200   23.6400  146.3000       9.9        96       865        95
VIS    2025250    200200   23.6400  146.2400      10.7        88       891        95
VIS    2025250    200200   23.6400  146.2200      10.8        88       904        98
VIS    2025250    200200   23.6500  146.2000      10.7        91       886        98
VIS    2025250    200200   23.6400  146.1600      10.8        96       899        99
VIS    2025250    200200   23.6400  146.1500      10.8        96       899        99
VIS    2025250    200200   23.6400  146.1100      10.6        94       908       100
VIS    2025250    200200   23.6500  146.0800      10.6        91       923        99
VIS    2025250    200200   23.6600  146.0500      10.1        88       994        98
VIS    2025250    200200   23.6400  145.9500      10.9        92       973        99
VIS    2025250    200200   23.6400  145.9300      10.8        93       951        99
VIS    2025250    200200   23.6400  145.9200      10.7        93       951        99
VIS    2025250    200200   23.6500  145.8300      10.6        91       990        99
VIS    2025250    200200   23.6500  145.5900      12.4        94       993        97
VIS    2025250    200200   23.6300  145.5700      12.1        96       967        97
VIS    2025250    200200   23.6300  145.5500      11.6        96       967        98
VIS    2025250    200200   23.6300  145.5400      11.3        96       951        98
VIS    2025250    200200   23.6500  145.5100      11.0        96       951        97
VIS    2025250    200200   23.6400  145.4900      11.0        97       945        97
VIS    2025250    200200   23.6300  145.4500       9.9        94       922        99
VIS    2025250    200200   23.6400  145.4400       9.6        92       923        99
VIS    2025250    200200   23.6500  145.4100       9.3        90       951        99
VIS    2025250    200200   23.6300  145.3800       9.3        88       956        98
VIS    2025250    200200   23.6400  144.5200      10.4        89      1000       100
VIS    2025250    200200   23.6200  144.4900      10.6        90       991       100
VIS    2025250    200200   23.6200  144.4800      10.6        91       991       100
VIS    2025250    200200   23.6200  144.4400      10.6        89       990        99
VIS    2025250    200200   23.6400  144.4000      10.1        89       990        99
VIS    2025250    200200   23.6400  144.3600      10.4        91       990        99
VIS    2025250    200200   23.6300  144.3200      11.0        94       989        99
VIS    2025250    200200   23.6300  144.3000      11.0        94       989        99
VIS    2025250    200200   23.6200  144.2700      10.9        96       969        99
VIS    2025250    200200   23.6200  142.5600      10.2        97       976        99
VIS    2025250    200200   23.6200  142.5600      10.2        97       976       100
VIS    2025250    200200   23.7200  152.0400       7.4        85       948        92
VIS    2025250    200200   23.7200  152.0200       7.4        83       945        91
VIS    2025250    200200   23.7200  151.9900       6.8        82       946        92
VIS    2025250    200200   23.7200  151.9800       6.5        81       947        93
VIS    2025250    200200   23.7100  151.9400       6.5        77       952        91
VIS    2025250    200200   23.6700  150.2100       8.7        92       991        90
VIS    2025250    200200   23.6800  150.1000       7.9       112       931        90
VIS    2025250    200200   23.6900  150.0900       7.4       107       953        92
VIS    2025250    200200   23.6800  150.0200       8.3       107       907        97
VIS    2025250    200200   23.6700  149.9900       7.6       101       904        99
VIS    2025250    200200   23.6700  149.9800       7.6        95       904        96
VIS    2025250    200200   23.6800  149.9600       7.9        99       883        94
VIS    2025250    200200   23.6700  149.9300       9.2       102       885        97
VIS    2025250    200200   23.6700  149.8800       9.9       101       878        95
VIS    2025250    200200   23.6600  149.8700       9.2       105       878        91
VIS    2025250    200200   23.6800  149.8400       9.1       105       875        96
VIS    2025250    200200   23.6600  149.8200       9.1       105       875        99
VIS    2025250    200200   23.6700  149.7800       7.4        94       865        92
VIS    2025250    200200   23.6800  149.7700       8.1        93       860        93
VIS    2025250    200200   23.6700  149.5400       7.4       116       794        90
VIS    2025250    200200   23.6800  149.5200       5.7       116       801        90
VIS    2025250    200200   23.6600  148.9900       9.8        98       999        99
VIS    2025250    200200   23.6500  148.9600       9.4        95       999        99
VIS    2025250    200200   23.6300  147.8900      10.2       114       991        93
VIS    2025250    200200   23.6500  147.8100       8.1        91       986        97
VIS    2025250    200200   23.6400  147.7800       8.4        93       993        99
VIS    2025250    200200   23.6500  147.7500       8.3        92       993        98
VIS    2025250    200200   23.6500  147.7500       8.3        91       993        99
VIS    2025250    200200   23.6400  147.7000       9.6       101       966        99
VIS    2025250    200200   23.6400  147.7000       9.7       103       966        98
VIS    2025250    200200   23.6400  147.6700       8.9       105       963        98
VIS    2025250    200200   23.6400  147.6400       9.1       100       906       100
VIS    2025250    200200   23.6300  147.6100       9.5        96       904        99
VIS    2025250    200200   23.6500  147.5700      10.6        99       915        99
VIS    2025250    200200   23.6300  147.5600      10.3       100       915        99
VIS    2025250    200200   23.6500  147.5400      10.7       104       909        97
VIS    2025250    200200   23.6500  147.5000       9.8       101       897        97
VIS    2025250    200200   23.6300  147.4900       9.5        96       896        98
VIS    2025250    200200   23.6300  147.4600       9.5        94       896        97
VIS    2025250    200200   23.6400  147.4300       9.7        95       903        97
VIS    2025250    200200   23.6300  147.4000       9.8        94       899        98
VIS    2025250    200200   23.6400  147.3900      10.0        93       901        98
VIS    2025250    200200   23.6300  147.3500       9.8        93       901        99
VIS    2025250    200200   23.6300  147.3300       9.2        96       910        99
VIS    2025250    200200   23.6400  147.3100       8.9        95       910        97
VIS    2025250    200200   23.6400  147.2900       9.1        94       899        93
VIS    2025250    200200   23.6300  147.2500       9.6        92       896        98
VIS    2025250    200200   23.6400  147.2200       9.5        93       896        99
VIS    2025250    200200   23.6400  147.2100       9.7        95       897        99
VIS    2025250    200200   23.6500  147.1800      10.0        98       899        99
VIS    2025250    200200   23.6500  147.1400       9.5        92       898        97
VIS    2025250    200200   23.6400  147.1300       9.6        94       899        98
VIS    2025250    200200   23.6400  147.1000       9.2        94       899        90
VIS    2025250    200200   23.6400  147.0800       8.7        96       900        99
VIS    2025250    200200   23.6400  147.0400       9.1        96       900        99
VIS    2025250    200200   23.6200  147.0200       9.4        93       903        99
VIS    2025250    200200   23.6200  146.9900       8.9        89       903        97
VIS    2025250    200200   23.6400  146.9600       8.7        91       939        99
VIS    2025250    200200   23.6200  146.9400       9.2        92       940       100
VIS    2025250    200200   23.6400  146.9200       9.7        87       978       100
VIS    2025250    200200   23.6200  146.9000       9.7        86       978        99
VIS    2025250    200200   23.6200  146.4300       9.7        94       968        93
VIS    2025250    200200   23.6300  146.3000       9.6        98       867        98
VIS    2025250    200200   23.6300  146.2700      10.1        93       892        97
VIS    2025250    200200   23.6300  146.2400      10.7        89       892        95
VIS    2025250    200200   23.6300  146.2200      10.8        88       904        99
VIS    2025250    200200   23.6300  146.2100      10.8        88       904        99
VIS    2025250    200200   23.6200  146.1700      10.9        92       908        99
VIS    2025250    200200   23.6100  146.1400      10.6        92       908        99
VIS    2025250    200200   23.6300  146.1200      10.5        92       908        99
VIS    2025250    200200   23.6100  146.1100      10.5        90       915        98
VIS    2025250    200200   23.6100  146.0500      10.5        86       990        98
VIS    2025250    200200   23.6100  146.0200      10.3        90       994       100
VIS    2025250    200200   23.6300  145.9900      10.2        91       991       100
VIS    2025250    200200   23.6100  145.9800      10.4        91       991        99
VIS    2025250    200200   23.6200  145.9400      11.0        93       973        98
VIS    2025250    200200   23.6200  145.9300      10.9        93       963        99
VIS    2025250    200200   23.6100  145.5900      12.2       100       967        95
VIS    2025250    200200   23.6200  145.5800      12.4       101       967        95
VIS    2025250    200200   23.6300  145.5600      11.8        98       952        97
VIS    2025250    200200   23.6200  145.5200      11.6        94       929        98
VIS    2025250    200200   23.6200  145.4900      10.8        96       929        97
VIS    2025250    200200   23.6100  145.4800      10.4        96       915        99
VIS    2025250    200200   23.6000  145.4400       9.5        94       915        99
VIS    2025250    200200   23.6200  145.4200       9.1        91       922        99
VIS    2025250    200200   23.6100  145.4100       9.2        92       926        99
VIS    2025250    200200   23.6200  145.3800       9.4        88       957        97
VIS    2025250    200200   23.6100  144.4900      10.9        90       991       100
VIS    2025250    200200   23.6100  144.4700      10.7        91       981        99
VIS    2025250    200200   23.6100  144.4600      10.7        91       981       100
VIS    2025250    200200   23.5900  144.4100      10.5        89       988        99
VIS    2025250    200200   23.5900  144.3400      11.1        94       980        98
VIS    2025250    200200   23.5900  144.3100      11.1        96       966        99
VIS    2025250    200200   23.5900  144.3100      11.1        96       966        99
VIS    2025250    200200   23.5900  144.2700      10.7        93       957        99
VIS    2025250    200200   23.6100  144.2500      10.5        94       966        98
VIS    2025250    200200   23.6900  152.0600       7.7        87       986        90
VIS    2025250    200200   23.6700  151.9900       6.4        84       955        94
VIS    2025250    200200   23.6700  151.9800       6.1        84       955        94
VIS    2025250    200200   23.6600  150.1000       8.1       108       918        93
VIS    2025250    200200   23.6600  149.9900       7.3        97       916       100
VIS    2025250    200200   23.6600  149.9800       7.4        94       916        97
VIS    2025250    200200   23.6600  149.9600       7.9        94       904        94
VIS    2025250    200200   23.6400  149.9300       8.7       103       904        97
VIS    2025250    200200   23.6500  149.8900       9.3        99       879        94
VIS    2025250    200200   23.6500  149.8400       9.6       109       881        94
VIS    2025250    200200   23.6600  149.8300       9.4       107       876        98
VIS    2025250    200200   23.6400  149.7900       8.0       113       863        96
VIS    2025250    200200   23.6500  149.7700       8.0       110       860        96
VIS    2025250    200200   23.6500  149.5600       8.3       111       782        90
VIS    2025250    200200   23.6300  149.5200       7.3       107       801        92
VIS    2025250    200200   23.6500  149.5200       7.3       110       801        91
VIS    2025250    200200   23.6100  147.9700      10.5       111       972        93
VIS    2025250    200200   23.6100  147.9300       9.3       115       951        94
VIS    2025250    200200   23.6200  147.8900      10.0       115       976        94
VIS    2025250    200200   23.6200  147.8500       9.4       111       959        96
VIS    2025250    200200   23.6100  147.8200       8.7       104       952        99
VIS    2025250    200200   23.6100  147.8000       8.8       106       966        99
VIS    2025250    200200   23.6100  147.7900       8.9       106       970        99
VIS    2025250    200200   23.6200  147.7600       8.6       104       952        99
VIS    2025250    200200   23.6100  147.7200       9.8       106       942        98
VIS    2025250    200200   23.6200  147.7100       9.9       107       944        97
VIS    2025250    200200   23.6100  147.6700       8.6       106       977        97
VIS    2025250    200200   23.6300  147.6600       8.7       105       963        98
VIS    2025250    200200   23.6000  147.6200       9.5        97       904       100
VIS    2025250    200200   23.6100  147.5900       9.4        94       906        98
VIS    2025250    200200   23.6100  147.5900       9.4        94       910        99
VIS    2025250    200200   23.6000  147.5600      10.0       102       913        99
VIS    2025250    200200   23.6100  147.5300      10.1       100       897        96
VIS    2025250    200200   23.6200  147.5000       9.4        95       896        97
VIS    2025250    200200   23.6200  147.4700       9.5        93       896        98
VIS    2025250    200200   23.6200  147.4600       9.5        93       896        97
VIS    2025250    200200   23.6100  147.4200       9.3        92       893        96
VIS    2025250    200200   23.6200  147.4100       9.6        93       893        96
VIS    2025250    200200   23.6100  147.3800      10.0        92       893        98
VIS    2025250    200200   23.6000  147.3500       9.5        96       899        99
VIS    2025250    200200   23.6000  147.3200       9.5        97       899        97
VIS    2025250    200200   23.6000  147.2900       9.9        98       895        94
VIS    2025250    200200   23.6200  147.2600       9.7        94       896        96
VIS    2025250    200200   23.6200  147.2500       9.7        93       896        97
VIS    2025250    200200   23.6000  147.2200       9.5        91       897        98
VIS    2025250    200200   23.6100  147.1900      10.0        94       898        99
VIS    2025250    200200   23.6100  147.1800      10.0        94       898        99
VIS    2025250    200200   23.6200  147.1300       9.6        94       899        98
VIS    2025250    200200   23.6200  147.1300       9.6        94       899        98
VIS    2025250    200200   23.6000  147.0800       9.4        94       899        99
VIS    2025250    200200   23.6000  147.0500       9.9        97       901       100
VIS    2025250    200200   23.6200  147.0400       9.7        97       901       100
VIS    2025250    200200   23.6200  147.0200       9.5        94       901        99
VIS    2025250    200200   23.6200  146.9800       9.0        91       902        98
VIS    2025250    200200   23.6200  146.9600       8.9        93       907        99
VIS    2025250    200200   23.6100  146.9400       9.3        91       913        99
VIS    2025250    200200   23.6100  146.9200       9.4        90       940        99
VIS    2025250    200200   23.6200  146.9000       9.6        87       978        99
VIS    2025250    200200   23.6100  146.4600      10.3        87       999        99
VIS    2025250    200200   23.5900  146.4300      10.2        86       947        98
VIS    2025250    200200   23.5900  146.4200      10.1        88       912        94
VIS    2025250    200200   23.6000  146.2600      10.1        97       956        98
VIS    2025250    200200   23.6000  146.2200      10.5        90       944        99
VIS    2025250    200200   23.6000  146.2000      10.9        87       927        99
VIS    2025250    200200   23.6000  146.1900      11.0        88       921        99
VIS    2025250    200200   23.6000  146.1700      10.9        88       916        99
VIS    2025250    200200   23.6100  146.1400      10.6        91       915        98
VIS    2025250    200200   23.6100  146.1000      10.5        89       917        98
VIS    2025250    200200   23.6000  146.0200      10.3        89       993       100
VIS    2025250    200200   23.5800  145.9600      11.1        92       997        97
VIS    2025250    200200   23.5900  145.9200      10.9        91       963        98
VIS    2025250    200200   23.5800  145.6300      10.8        92       987        94
VIS    2025250    200200   23.6000  145.6100      12.1        99       987        91
VIS    2025250    200200   23.5800  145.5800      12.0        98       949        96
VIS    2025250    200200   23.5800  145.5500      11.8       100       919        96
VIS    2025250    200200   23.6000  145.5300      11.9        98       916        96
VIS    2025250    200200   23.6000  145.5200      11.9        96       916        97
VIS    2025250    200200   23.6000  145.4900      10.6        96       915        98
VIS    2025250    200200   23.5800  145.4700      10.2        98       913        98
VIS    2025250    200200   23.6000  145.4400       9.5        94       915        99
VIS    2025250    200200   23.5900  145.4100       9.7        94       918        97
VIS    2025250    200200   23.5800  145.3800      10.4        92       931       100
VIS    2025250    200200   23.5900  145.3700      10.3        89       940        99
VIS    2025250    200200   23.5800  144.4800      11.1        90       977        99
VIS    2025250    200200   23.5800  144.4700      11.1        90       975        99
VIS    2025250    200200   23.5700  144.4300      11.1        91       968        99
VIS    2025250    200200   23.5700  144.3500      11.1        92       994        99
VIS    2025250    200200   23.5900  144.3300      11.0        96       966        99
VIS    2025250    200200   23.5900  144.3200      11.1        96       966        99
VIS    2025250    200200   23.5800  144.2900      11.2        94       951        99
VIS    2025250    200200   23.5900  144.2700      10.6        92       957        99
VIS    2025250    200200   23.5500  142.5900       9.3        93       984        93
VIS    2025250    200200   23.5600  142.5700      10.0        96       980        99
VIS    2025250    200200   23.5600  142.5500      10.1        97       977        99
VIS    2025250    200200   23.5600  142.5300      10.3        98       977        99
VIS    2025250    200200   23.5500  142.5100      10.2        96       980        97
VIS    2025250    200200   23.6600  152.3100       4.6       101       996        98
VIS    2025250    200200   23.6600  152.0000       6.4        86       958        94
VIS    2025250    200200   23.6700  152.0000       6.4        85       958        94
VIS    2025250    200200   23.6100  149.9500       8.9       106       959        91
VIS    2025250    200200   23.6200  149.9100       8.5       102       904        98
VIS    2025250    200200   23.6100  149.9000       8.4       103       880        99
VIS    2025250    200200   23.6200  149.8700       9.1       107       879        95
VIS    2025250    200200   23.6200  149.8400      10.2       116       891        90
VIS    2025250    200200   23.6200  149.8100       9.2       121       872        93
VIS    2025250    200200   23.6300  149.7900       8.3       119       865        93
VIS    2025250    200200   23.6300  149.7600       8.6       119       858        97
VIS    2025250    200200   23.6300  149.6300       8.3       116       772        90
VIS    2025250    200200   23.6300  149.6100       8.1       115       777        91
VIS    2025250    200200   23.6100  149.5400       7.3       109       815        95
VIS    2025250    200200   23.6200  149.5200       7.0       107       805        93
VIS    2025250    200200   23.5800  147.9900      11.4       108       975        94
VIS    2025250    200200   23.5900  147.9600      10.4       110       933        95
VIS    2025250    200200   23.5900  147.9500      10.2       109       933        96
VIS    2025250    200200   23.5800  147.9100      10.0       109       935        96
VIS    2025250    200200   23.5900  147.8800      10.2       111       940        94
VIS    2025250    200200   23.5900  147.8800      10.1       111       941        95
VIS    2025250    200200   23.5800  147.8400       9.1       102       919        99
VIS    2025250    200200   23.6000  147.8100       8.8       102       952        99
VIS    2025250    200200   23.6000  147.8000       8.8       104       956        99
VIS    2025250    200200   23.5900  147.7700       9.1       104       936        99
VIS    2025250    200200   23.6000  147.7400       9.1       105       941        99
VIS    2025250    200200   23.5800  147.7200       9.2       105       941        98
VIS    2025250    200200   23.5800  147.6800       9.1       106       966        97
VIS    2025250    200200   23.5800  147.6700       8.9       106       966        97
VIS    2025250    200200   23.5900  147.6400       8.7       100       927        99
VIS    2025250    200200   23.5800  147.6100      10.1       102       919        99
VIS    2025250    200200   23.5900  147.5900      10.1        99       928        98
VIS    2025250    200200   23.6000  147.5500      10.0       102       913        99
VIS    2025250    200200   23.5900  147.5300      10.2       101       898        97
VIS    2025250    200200   23.6000  147.5200      10.0        99       896        97
VIS    2025250    200200   23.5900  147.4900       9.5        90       895        97
VIS    2025250    200200   23.5900  147.4500       9.5        90       894        97
VIS    2025250    200200   23.5900  147.4300       9.2        91       893        94
VIS    2025250    200200   23.5800  147.4000       9.3        91       893        92
VIS    2025250    200200   23.6000  147.3800       9.7        92       895        98
VIS    2025250    200200   23.5900  147.3400       9.5        95       898        99
VIS    2025250    200200   23.5900  147.3400       9.5        97       898        99
VIS    2025250    200200   23.5900  147.3100       9.9        97       897        96
VIS    2025250    200200   23.5800  147.2800      10.2        98       895        95
VIS    2025250    200200   23.5700  147.2600       9.9        95       895        98
VIS    2025250    200200   23.5700  147.2200       9.5        92       898        98
VIS    2025250    200200   23.5800  147.2100       9.5        92       898        99
VIS    2025250    200200   23.5900  147.1700       9.8        91       898        98
VIS    2025250    200200   23.5900  147.1600       9.8        90       899        97
VIS    2025250    200200   23.5800  147.1100       9.3        91       899        99
VIS    2025250    200200   23.5800  147.1100       9.3        91       899        99
VIS    2025250    200200   23.5900  147.0800       9.7        94       899        99
VIS    2025250    200200   23.5800  147.0400      10.2        96       901       100
VIS    2025250    200200   23.5900  147.0200      10.1        96       902        99
VIS    2025250    200200   23.5900  147.0000      10.1        93       901        98
VIS    2025250    200200   23.5800  146.9600      10.2        90       901        97
VIS    2025250    200200   23.5800  146.9500      10.1        89       901        97
VIS    2025250    200200   23.5700  146.9100       9.7        94       908       100
VIS    2025250    200200   23.5700  146.9000       9.2        97       913       100
VIS    2025250    200200   23.5700  146.8800       8.6       100       922        98
VIS    2025250    200200   23.5600  146.5000       9.4        83       994        97
VIS    2025250    200200   23.5900  146.4800       9.3        86       999        96
VIS    2025250    200200   23.5800  146.4500      10.2        87       960        99
VIS    2025250    200200   23.5800  146.4300      10.3        87       947        98
VIS    2025250    200200   23.5600  146.2800      11.3        91       942        94
VIS    2025250    200200   23.5600  146.2500      11.3        93       954        97
VIS    2025250    200200   23.5800  146.2300      10.9        94       956        98
VIS    2025250    200200   23.5700  146.2100      10.6        88       928        99
VIS    2025250    200200   23.5800  146.1800      10.7        87       924        99
VIS    2025250    200200   23.5800  146.1400      10.4        89       917        97
VIS    2025250    200200   23.5600  146.1200       9.6        88       925        93
VIS    2025250    200200   23.5600  145.5900      11.8        90       958        93
VIS    2025250    200200   23.5700  145.5800      12.0        96       949        96
VIS    2025250    200200   23.5700  145.5600      11.8        98       919        96
VIS    2025250    200200   23.5700  145.5400      11.9       100       916        96
VIS    2025250    200200   23.5500  145.5000      11.8        99       913        96
VIS    2025250    200200   23.5600  145.4800      10.9        98       913        97
VIS    2025250    200200   23.5700  145.4400       9.9       100       912        93
VIS    2025250    200200   23.5700  145.4200       9.6        98       914        96
VIS    2025250    200200   23.5700  145.4000      10.1        96       916        98
VIS    2025250    200200   23.5700  145.3800      10.7        92       918        99
VIS    2025250    200200   23.5600  144.5100      11.3        88       990        97
VIS    2025250    200200   23.5400  144.4800      11.3        91       984        99
VIS    2025250    200200   23.5600  144.4600      11.2        91       969        99
VIS    2025250    200200   23.5500  144.4400      11.1        90       966        99
VIS    2025250    200200   23.5500  144.4300      10.9        91       968        99
VIS    2025250    200200   23.5600  144.4000      10.6        91       975        98
VIS    2025250    200200   23.5600  144.3600      11.1        91       994        99
VIS    2025250    200200   23.5400  144.3100      11.0        90       964        99
VIS    2025250    200200   23.5600  144.3000      11.2        91       951        99
VIS    2025250    200200   23.5500  144.2600      10.9        91       923        99
VIS    2025250    200200   23.5500  144.2300      10.3        91       948       100
VIS    2025250    200200   23.5500  142.5900       9.3        93       984        94
VIS    2025250    200200   23.5500  142.5700       9.7        95       982        95
VIS    2025250    200200   23.5500  142.5400      10.0        97       968        99
VIS    2025250    200200   23.5500  142.5300      10.1        97       968        99
VIS    2025250    200200   23.6100  150.1700       8.7       106       958        91
VIS    2025250    200200   23.6100  150.1600       8.5       106       958        92
VIS    2025250    200200   23.5900  149.9400       8.3       109       905        97
VIS    2025250    200200   23.5900  149.9200       8.0       107       894        99
VIS    2025250    200200   23.5900  149.9100       7.9       105       886       100
VIS    2025250    200200   23.6000  149.8800       8.8       109       879        98
VIS    2025250    200200   23.6000  149.8400       9.3       116       878        96
VIS    2025250    200200   23.5900  149.8100       7.0       101       876        95
VIS    2025250    200200   23.6100  149.7900       7.8       113       871        96
VIS    2025250    200200   23.6000  149.7700       8.2       115       869        99
VIS    2025250    200200   23.5900  149.5600       8.6       112       817        91
VIS    2025250    200200   23.5900  149.5200       7.0       112       824        96
VIS    2025250    200200   23.6000  149.5000       6.7       113       836        90
VIS    2025250    200200   23.5600  148.0200      11.7       108       975        95
VIS    2025250    200200   23.5800  148.0000      12.0       106       975        95
VIS    2025250    200200   23.5800  147.9900      11.7       107       975        95
VIS    2025250    200200   23.5800  147.9700      10.8       111       933        96
VIS    2025250    200200   23.5700  147.9300      10.1       108       935        95
VIS    2025250    200200   23.5600  147.9100      10.3       109       939        96
VIS    2025250    200200   23.5600  147.8700      10.7       112       935        94
VIS    2025250    200200   23.5700  147.8500      10.2       108       919        93
VIS    2025250    200200   23.5600  147.8200      10.0       101       908        95
VIS    2025250    200200   23.5700  147.8100       9.3       100       912        98
VIS    2025250    200200   23.5700  147.7700       9.5       103       911        98
VIS    2025250    200200   23.5600  147.7600       9.4       101       911        99
VIS    2025250    200200   23.5600  147.7200       9.6       102       908        99
VIS    2025250    200200   23.5600  147.6900       9.5       106       912        99
VIS    2025250    200200   23.5700  147.6900       9.3       106       965        97
VIS    2025250    200200   23.5600  147.6600       8.7       102       955        99
VIS    2025250    200200   23.5600  147.6200       9.4       101       943        99
VIS    2025250    200200   23.5700  147.6100      10.3       103       919        99
VIS    2025250    200200   23.5600  147.5800      10.6       103       928        98
VIS    2025250    200200   23.5600  147.5400       9.9        99       907        98
VIS    2025250    200200   23.5700  147.5300      10.0       101       907        98
VIS    2025250    200200   23.5500  147.5000       9.7        92       893        97
VIS    2025250    200200   23.5500  147.4700       9.5        92       891        98
VIS    2025250    200200   23.5600  147.4500       9.3        91       892        95
VIS    2025250    200200   23.5500  147.4000       9.9        94       893        97
VIS    2025250    200200   23.5600  147.3600       9.6        94       894        98
VIS    2025250    200200   23.5500  147.3300       9.8        96       894        99
VIS    2025250    200200   23.5600  147.3300       9.9        96       894        98
VIS    2025250    200200   23.5500  147.3000       9.7        93       894        98
VIS    2025250    200200   23.5500  147.2500      10.0        89       894        96
VIS    2025250    200200   23.5600  147.2300       9.7        90       898        98
VIS    2025250    200200   23.5600  147.2200       9.6        91       898        98
VIS    2025250    200200   23.5500  147.1900       9.6        92       898        95
VIS    2025250    200200   23.5500  147.1700       9.3        90       898        94
VIS    2025250    200200   23.5600  147.1400       9.2        89       898        95
VIS    2025250    200200   23.5600  147.1200       9.1        90       898        95
VIS    2025250    200200   23.5500  147.0900       9.8        90       898        97
VIS    2025250    200200   23.5600  147.0500      10.3        95       900        99
VIS    2025250    200200   23.5600  147.0400      10.1        94       901        99
VIS    2025250    200200   23.5600  147.0000      10.1        92       902        97
VIS    2025250    200200   23.5600  146.9900      10.2        92       901        97
VIS    2025250    200200   23.5600  146.9500      10.2        90       902        98
VIS    2025250    200200   23.5400  146.9200       9.3        95       907       100
VIS    2025250    200200   23.5600  146.9000       9.2        98       909       100
VIS    2025250    200200   23.5600  146.8700       8.4       101       922        98
VIS    2025250    200200   23.5600  146.4900       9.2        84       994        99
VIS    2025250    200200   23.5400  146.4000       7.1       109       881        93
VIS    2025250    200200   23.5400  146.3700       8.8       105       907        96
VIS    2025250    200200   23.5400  146.3600      10.3        98       926        99
VIS    2025250    200200   23.5400  146.3300      10.8        93       925        99
VIS    2025250    200200   23.5400  146.3000      10.8        93       918        99
VIS    2025250    200200   23.5500  146.2700      11.5        92       927        96
VIS    2025250    200200   23.5500  146.2500      11.4        91       917        96
VIS    2025250    200200   23.5400  146.2200      10.4        89       922        98
VIS    2025250    200200   23.5400  146.2000      10.4        89       927        97
VIS    2025250    200200   23.5600  146.1700      10.6        88       922        99
VIS    2025250    200200   23.5600  146.1600      10.6        89       922        99
VIS    2025250    200200   23.5500  145.5900      11.6        89       958        97
VIS    2025250    200200   23.5400  145.5700      11.6        90       952        99
VIS    2025250    200200   23.5300  145.5500      11.6        92       931        98
VIS    2025250    200200   23.5300  145.5200      11.9        97       917        96
VIS    2025250    200200   23.5300  145.4800      11.7        98       914        95
VIS    2025250    200200   23.5300  145.4800      11.6        97       914        96
VIS    2025250    200200   23.5300  145.4400      10.5        99       914        97
VIS    2025250    200200   23.5300  145.4200      10.3       100       914        97
VIS    2025250    200200   23.5400  145.3800      10.2        96       916        99
VIS    2025250    200200   23.5400  145.3700      10.4        94       918        99
VIS    2025250    200200   23.5300  145.3300      10.6        87       971        95
VIS    2025250    200200   23.5300  144.4900      11.2        91       988        99
VIS    2025250    200200   23.5200  144.4600      11.2        89       980        99
VIS    2025250    200200   23.5400  144.4400      11.0        89       972        99
VIS    2025250    200200   23.5300  144.4100      10.7        92       972        99
VIS    2025250    200200   23.5200  144.4000      10.9        95       971        99
VIS    2025250    200200   23.5200  144.3700      10.6        90       968        99
VIS    2025250    200200   23.5200  144.3500      10.4        82       968        96
VIS    2025250    200200   23.5400  144.3100      10.9        89       966        99
VIS    2025250    200200   23.5300  144.2900      11.2        88       952        99
VIS    2025250    200200   23.5200  144.2600      10.8        89       924        99
VIS    2025250    200200   23.5100  143.5500      10.5       100       992        96
VIS    2025250    200200   23.5300  143.4400      10.4        95       990        99
VIS    2025250    200200   23.5600  150.1800       8.4       105       990        91
VIS    2025250    200200   23.5900  150.1500       7.5       101       970        96
VIS    2025250    200200   23.5600  150.1200       7.1        95       965        98
VIS    2025250    200200   23.5600  150.1100       7.2        98       965        96
VIS    2025250    200200   23.5600  149.9500       8.9       113       886        97
VIS    2025250    200200   23.5700  149.9500       8.6       113       886        98
VIS    2025250    200200   23.5800  149.9200       7.9       108       886       100
VIS    2025250    200200   23.5600  149.8800       7.2       106       879        93
VIS    2025250    200200   23.5800  149.8700       8.6       111       878        96
VIS    2025250    200200   23.5700  149.8400       8.1       112       878        94
VIS    2025250    200200   23.5800  149.8000       7.2        97       872        90
VIS    2025250    200200   23.5700  149.7500       9.5       113       868        98
VIS    2025250    200200   23.5700  149.5400       7.9       113       821        96
VIS    2025250    200200   23.5700  149.5400       7.7       113       824        97
VIS    2025250    200200   23.5700  149.5100       7.7       115       828        96
VIS    2025250    200200   23.5400  148.0600      10.2        92       986        99
VIS    2025250    200200   23.5400  148.0300      10.8       106       947        97
VIS    2025250    200200   23.5400  148.0100      11.6       110       932        94
VIS    2025250    200200   23.5500  147.9900      11.4       109       930        95
VIS    2025250    200200   23.5500  147.9700      10.6       112       923        94
VIS    2025250    200200   23.5500  147.9400      10.4       112       930        91
VIS    2025250    200200   23.5500  147.9200      10.5       111       939        93
VIS    2025250    200200   23.5500  147.8900      10.4       110       939        96
VIS    2025250    200200   23.5300  147.8700       9.9       110       917        96
VIS    2025250    200200   23.5300  147.8400      10.1       104       908        96
VIS    2025250    200200   23.5500  147.8200      10.1       101       908        96
VIS    2025250    200200   23.5300  147.7900      10.2       101       896        98
VIS    2025250    200200   23.5400  147.7600       9.6       100       896        99
VIS    2025250    200200   23.5500  147.7200       9.9       101       903        99
VIS    2025250    200200   23.5300  147.7000      10.3       103       895        99
VIS    2025250    200200   23.5300  147.6700       9.8       103       903        99
VIS    2025250    200200   23.5300  147.6700       9.6       102       902       100
VIS    2025250    200200   23.5300  147.6400       9.1       101       922       100
VIS    2025250    200200   23.5300  147.5900       9.4        96       905        99
VIS    2025250    200200   23.5400  147.5700       9.8        97       907        97
VIS    2025250    200200   23.5400  147.5400       9.7        97       907        93
VIS    2025250    200200   23.5500  147.5400       9.8        98       907        96
VIS    2025250    200200   23.5500  147.5000       9.8        93       893        97
VIS    2025250    200200   23.5500  147.4700       9.6        93       891        98
VIS    2025250    200200   23.5500  147.4500       9.4        94       892        96
VIS    2025250    200200   23.5300  147.4300       9.6        97       893        96
VIS    2025250    200200   23.5300  147.4100      10.1        95       893        97
VIS    2025250    200200   23.5200  147.3800      10.1        93       893        98
VIS    2025250    200200   23.5200  147.3400      10.0        98       894        98
VIS    2025250    200200   23.5300  147.3300       9.9        97       894        98
VIS    2025250    200200   23.5400  147.2900       9.7        91       893        97
VIS    2025250    200200   23.5400  147.2600      10.0        88       893        95
VIS    2025250    200200   23.5400  147.2400       9.9        87       896        95
VIS    2025250    200200   23.5400  147.2300       9.7        88       898        95
VIS    2025250    200200   23.5300  147.1900       9.7        91       898        94
VIS    2025250    200200   23.5300  147.1700       9.7        89       898        93
VIS    2025250    200200   23.5400  147.1300       9.2        91       897        97
VIS    2025250    200200   23.5300  147.1100       9.4        93       898        95
VIS    2025250    200200   23.5300  147.0900       9.8        92       898        96
VIS    2025250    200200   23.5300  147.0700      10.0        92       899        98
VIS    2025250    200200   23.5400  147.0300      10.0        92       902        99
VIS    2025250    200200   23.5400  147.0300       9.9        91       902        99
VIS    2025250    200200   23.5200  146.9800       9.3        96       904        99
VIS    2025250    200200   23.5200  146.9700       9.3        96       904        99
VIS    2025250    200200   23.5300  146.9400       9.2        93       907        99
VIS    2025250    200200   23.5400  146.9000       8.5        97       908        99
VIS    2025250    200200   23.5200  146.8800       8.1        97       914        98
VIS    2025250    200200   23.5200  146.8700       8.2        97       914        98
VIS    2025250    200200   23.5300  146.8500       8.8        93       921        98
VIS    2025250    200200   23.5200  146.5200      11.0        86       994        98
VIS    2025250    200200   23.5200  146.4300       8.5       104       904        90
VIS    2025250    200200   23.5300  146.3800      10.1        93       926       100
VIS    2025250    200200   23.5100  146.3500      11.0        91       925        99
VIS    2025250    200200   23.5200  146.3400      11.0        92       925        99
VIS    2025250    200200   23.5300  146.3000      10.9        92       914        99
VIS    2025250    200200   23.5100  146.2900      11.0        92       909        98
VIS    2025250    200200   23.5300  146.2500      11.2        89       915        98
VIS    2025250    200200   23.5300  146.2400      11.1        89       915        98
VIS    2025250    200200   23.5200  146.2000      10.5        89       927        97
VIS    2025250    200200   23.5300  146.1900      10.5        89       927        97
VIS    2025250    200200   23.5200  146.1600      10.6        89       946        98
VIS    2025250    200200   23.5200  145.5800      11.2        89       976       100
VIS    2025250    200200   23.5200  145.5500      11.6        94       952        99
VIS    2025250    200200   23.5000  145.5400      11.7        96       934        97
VIS    2025250    200200   23.5200  145.5100      12.0        96       917        96
VIS    2025250    200200   23.5100  145.4900      11.8        96       917        96
VIS    2025250    200200   23.5200  145.4500      10.9        96       914        98
VIS    2025250    200200   23.5000  145.4200      10.3        96       919        99
VIS    2025250    200200   23.5000  145.4000       9.9        95       922        99
VIS    2025250    200200   23.5100  145.3700       9.9        95       922        99
VIS    2025250    200200   23.5100  145.3400       9.8        91       948        99
VIS    2025250    200200   23.5100  145.3100      10.1        86       971        97
VIS    2025250    200200   23.5100  144.4800      11.1        90       988        99
VIS    2025250    200200   23.5100  144.4800      11.0        89       986        99
VIS    2025250    200200   23.4900  144.4500      11.0        88       979        95
VIS    2025250    200200   23.5100  144.4100      11.2        94       971        99
VIS    2025250    200200   23.5100  144.3800      11.2        94       949        99
VIS    2025250    200200   23.5100  144.3800      11.1        93       949        99
VIS    2025250    200200   23.5000  144.3500      10.7        82       934        97
VIS    2025250    200200   23.5000  144.2600      10.6        89       930        99
VIS    2025250    200200   23.5000  144.2400      10.4        90       943        99
VIS    2025250    200200   23.4800  143.5600      10.5        98       979        98
VIS    2025250    200200   23.4800  143.5400      10.3        96       973        97
VIS    2025250    200200   23.4900  143.4500      10.1        95      1000        99
VIS    2025250    200200   23.4900  143.4300      10.1        95       992        99
VIS    2025250    200200   23.5000  143.4100      10.1        96       990        99
VIS    2025250    200200   23.4900  143.3700       9.8       101       989        92
VIS    2025250    200200   23.5900  151.9400       5.3        96       979        95
VIS    2025250    200200   23.5800  151.9300       5.4       102       979        99
VIS    2025250    200200   23.5400  150.1500       7.2        90       983        97
VIS    2025250    200200   23.5400  150.1300       7.2        92       970        97
VIS    2025250    200200   23.5400  149.9800       9.6       108       915        92
VIS    2025250    200200   23.5500  149.9600       9.4       110       894        96
VIS    2025250    200200   23.5400  149.9200       7.5       107       884        98
VIS    2025250    200200   23.5400  149.8700       6.6       108       880        91
VIS    2025250    200200   23.5500  149.8500       7.1       113       879        90
VIS    2025250    200200   23.5300  149.8200       7.8       111       876        97
VIS    2025250    200200   23.5500  149.8100       7.5        95       876        94
VIS    2025250    200200   23.5400  149.7600       9.3       107       868        98
VIS    2025250    200200   23.5400  149.7600       9.2       108       867        99
VIS    2025250    200200   23.5100  148.0900       9.7        95       989       100
VIS    2025250    200200   23.5100  148.0800       9.7        94       986       100
VIS    2025250    200200   23.5100  148.0400      10.1        97       947        99
VIS    2025250    200200   23.5100  148.0200      10.5       106       936        98
VIS    2025250    200200   23.5100  148.0000      10.6       111       922        95
VIS    2025250    200200   23.5200  147.9800      10.8       111       915        94
VIS    2025250    200200   23.5200  147.9500      10.7       116       922        92
VIS    2025250    200200   23.5000  147.9300      10.2       112       936        95
VIS    2025250    200200   23.5100  147.9000       9.4       104       941        99
VIS    2025250    200200   23.5100  147.8700       9.3       108       923        98
VIS    2025250    200200   23.5000  147.8500       9.8       105       901        96
VIS    2025250    200200   23.5000  147.8100      10.2        99       895        98
VIS    2025250    200200   23.5000  147.8000      10.3        98       894        98
VIS    2025250    200200   23.5100  147.7700       9.8        99       894        98
VIS    2025250    200200   23.5100  147.7600       9.8        98       891        99
VIS    2025250    200200   23.5100  147.7100      10.1       100       894        99
VIS    2025250    200200   23.5000  147.6900      10.2        97       894        98
VIS    2025250    200200   23.5000  147.6800      10.2        97       894        98
VIS    2025250    200200   23.5100  147.6400       9.2        99       901       100
VIS    2025250    200200   23.5100  147.6200       9.0        97       911       100
VIS    2025250    200200   23.5200  147.6000       9.2        95       909        99
VIS    2025250    200200   23.5100  147.5700       9.2        92       896        93
VIS    2025250    200200   23.5100  147.4900       9.9        96       893        98
VIS    2025250    200200   23.5200  147.4600       9.7        97       893        97
VIS    2025250    200200   23.5100  147.4400       9.4        97       893        97
VIS    2025250    200200   23.5200  147.4000      10.0        94       893        98
VIS    2025250    200200   23.5100  147.3900      10.1        92       893        97
VIS    2025250    200200   23.5200  147.3700      10.1        94       893        98
VIS    2025250    200200   23.5200  147.3400      10.1        98       894        99
VIS    2025250    200200   23.5200  147.3100       9.7        97       894        97
VIS    2025250    200200   23.5000  147.2900       9.6        95       893        97
VIS    2025250    200200   23.5200  147.2200       9.7        90       896        95
VIS    2025250    200200   23.5200  147.2200       9.7        90       896        95
VIS    2025250    200200   23.5200  147.1900       9.7        92       898        96
VIS    2025250    200200   23.5000  147.1200       9.4        93       898        98
VIS    2025250    200200   23.5100  147.1200       9.3        94       898        97
VIS    2025250    200200   23.5000  147.0700       9.2        93       900        98
VIS    2025250    200200   23.5000  147.0400       9.7        94       902        98
VIS    2025250    200200   23.5100  147.0000       9.6        97       904        99
VIS    2025250    200200   23.5000  146.9800       8.3        98       904        98
VIS    2025250    200200   23.5100  146.9400       9.1        93       907        98
VIS    2025250    200200   23.5000  146.9300       9.0        95       908        99
VIS    2025250    200200   23.5000  146.8900       7.9        97       909        98
VIS    2025250    200200   23.4900  146.8600       8.3        96       914        96
VIS    2025250    200200   23.4900  146.8600       8.4        95       922        95
VIS    2025250    200200   23.4900  146.8200       9.1        92       944        99
VIS    2025250    200200   23.5100  146.4400       8.5       110       917        92
VIS    2025250    200200   23.5100  146.4300       7.7       107       911        93
VIS    2025250    200200   23.4900  146.3700      11.7        84       930        90
VIS    2025250    200200   23.5000  146.3500      11.0        89       918        99
VIS    2025250    200200   23.4800  146.3100      10.7        91       910        98
VIS    2025250    200200   23.4900  146.2600      11.2        89       924        97
VIS    2025250    200200   23.4800  146.2100      11.1        89       961        94
VIS    2025250    200200   23.4800  146.2000      11.1        90       975        95
VIS    2025250    200200   23.4900  146.1400      10.4        90       974        98
VIS    2025250    200200   23.4900  146.1200      10.5        89       977        97
VIS    2025250    200200   23.4800  146.0800      10.4        89       990        91
VIS    2025250    200200   23.4900  145.3500       9.6        94       946        91
VIS    2025250    200200   23.4700  145.3300       9.9        90       948        93
VIS    2025250    200200   23.4700  144.4700      10.8        91       995        97
VIS    2025250    200200   23.4900  144.4500      10.9        88       972        94
VIS    2025250    200200   23.4700  144.4100      11.3        91       952        98
VIS    2025250    200200   23.4900  144.4000      11.3        94       949        99
VIS    2025250    200200   23.4600  144.3800      11.2        94       918        98
VIS    2025250    200200   23.4800  144.3400      11.2        85       934        94
VIS    2025250    200200   23.4700  144.3300      11.3        86       934        98
VIS    2025250    200200   23.4700  144.3000      10.3        88       983        99
VIS    2025250    200200   23.4600  143.6200      10.4        91       981        99
VIS    2025250    200200   23.4600  143.6100      10.5        91       997        99
VIS    2025250    200200   23.4800  143.5600      10.6        98       979        99
VIS    2025250    200200   23.4800  143.5600      10.5        98       979        99
VIS    2025250    200200   23.4600  143.5200      10.2        94       972        99
VIS    2025250    200200   23.4600  143.5100      10.2        91       959        99
VIS    2025250    200200   23.4600  143.4800      10.2        94       973        99
VIS    2025250    200200   23.4600  143.4500      10.1        96       978        99
VIS    2025250    200200   23.4600  143.4200       9.9        97       982        99
VIS    2025250    200200   23.4600  143.4000       9.6        99       982        98
VIS    2025250    200200   23.4600  143.3800       9.3       100       989        94
VIS    2025250    200200   23.4800  143.3600       9.8       102       994        91
VIS    2025250    200200   23.4500  143.2300       9.8        94       993        90
VIS    2025250    200200   23.4700  143.0700      10.2       102       991        96
VIS    2025250    200200   23.4700  143.0400      10.1       100       992        95
VIS    2025250    200200   23.4500  143.0300       9.8        99       992        97
VIS    2025250    200200   23.5500  151.9600       5.7       104       970        99
VIS    2025250    200200   23.5400  151.9300       6.2       108       973       100
VIS    2025250    200200   23.5500  151.9200       6.0       108       981       100
VIS    2025250    200200   23.5400  151.8300       6.0       101       994        99
VIS    2025250    200200   23.5200  150.1500       7.5       100       973        94
VIS    2025250    200200   23.5300  150.1200       7.4        96       967        95
VIS    2025250    200200   23.5100  150.1000       7.6       101       946        97
VIS    2025250    200200   23.5200  150.0800       7.6       105       950        95
VIS    2025250    200200   23.5100  149.9600       8.4       104       915        97
VIS    2025250    200200   23.5100  149.9600       8.2       104       911        98
VIS    2025250    200200   23.5200  149.9200       7.5       102       884        95
VIS    2025250    200200   23.5100  149.8400       6.6       117       876        94
VIS    2025250    200200   23.5300  149.8200       7.9       113       876        97
VIS    2025250    200200   23.5300  149.7900       9.1       104       875        97
VIS    2025250    200200   23.5100  149.7600       7.9       102       872        99
VIS    2025250    200200   23.5100  149.7400       7.4       109       813        93
VIS    2025250    200200   23.5200  149.6300       9.6       117       834        91
VIS    2025250    200200   23.5200  149.6000      10.1       115       824        90
VIS    2025250    200200   23.5000  149.5800       9.1       115       829        94
VIS    2025250    200200   23.5000  149.5500       7.8       114       829        92
VIS    2025250    200200   23.4800  148.1400      10.7        96       989        99
VIS    2025250    200200   23.4800  148.1100      10.0        92       989        99
VIS    2025250    200200   23.5000  148.0900       9.8        96       989       100
VIS    2025250    200200   23.5000  148.0700       9.8        95       986        99
VIS    2025250    200200   23.5000  148.0400      10.0        99       947        99
VIS    2025250    200200   23.5000  148.0100      10.5       108       924        97
VIS    2025250    200200   23.4900  147.9200       9.9       106       930        94
VIS    2025250    200200   23.4800  147.8900       9.3        96       912        99
VIS    2025250    200200   23.4900  147.8600       9.7       105       901        90
VIS    2025250    200200   23.4800  147.7800      10.3        98       889        97
VIS    2025250    200200   23.4800  147.7700      10.4        97       889        96
VIS    2025250    200200   23.4900  147.7500       9.9        94       891        98
VIS    2025250    200200   23.4800  147.7100       9.6        91       893        98
VIS    2025250    200200   23.5000  147.6900      10.2        95       894        98
VIS    2025250    200200   23.4800  147.6700       9.8        93       893        98
VIS    2025250    200200   23.4800  147.6500       9.2        96       894        99
VIS    2025250    200200   23.4900  147.6200       8.8        95       901        99
VIS    2025250    200200   23.4800  147.5800       9.2        92       892        92
VIS    2025250    200200   23.4700  147.5500       9.5        94       890        91
VIS    2025250    200200   23.4800  147.5400       9.5        95       891        91
VIS    2025250    200200   23.4800  147.5100       9.5        95       891        95
VIS    2025250    200200   23.4700  147.4900       9.5        94       893        97
VIS    2025250    200200   23.4900  147.4700       9.6        95       893        96
VIS    2025250    200200   23.4900  147.4300       9.2        92       894        97
VIS    2025250    200200   23.4800  147.4000       9.6        91       894        98
VIS    2025250    200200   23.4800  147.3700      10.3        96       894        98
VIS    2025250    200200   23.4800  147.3600      10.4        97       894        98
VIS    2025250    200200   23.4900  147.3200      10.7       101       894        93
VIS    2025250    200200   23.4800  147.3100      10.4        99       894        96
VIS    2025250    200200   23.4900  147.2700       9.7        94       895        96
VIS    2025250    200200   23.4900  147.2600       9.7        94       895        95
VIS    2025250    200200   23.4700  147.2300       9.5        92       896        98
VIS    2025250    200200   23.4800  147.2100       9.6        92       897        97
VIS    2025250    200200   23.4700  147.1700      10.4        93       899        96
VIS    2025250    200200   23.4700  147.1500      10.4        93       899        95
VIS    2025250    200200   23.4800  147.1300       9.7        91       899        96
VIS    2025250    200200   23.4700  147.0900       8.5        89       900        97
VIS    2025250    200200   23.4700  147.0700       8.3        87       901        94
VIS    2025250    200200   23.4700  147.0500       8.6        89       902        94
VIS    2025250    200200   23.4900  147.0200       9.3        98       903        99
VIS    2025250    200200   23.4800  146.9900       7.9       102       904        91
VIS    2025250    200200   23.4800  146.9600       7.9        97       906        91
VIS    2025250    200200   23.4700  146.9300       9.1        99       907        97
VIS    2025250    200200   23.4700  146.9300       9.1        99       907        98
VIS    2025250    200200   23.4900  146.8800       7.9        99       909        93
VIS    2025250    200200   23.4900  146.8600       8.4        95       922        95
VIS    2025250    200200   23.4600  146.8500       8.7        94       922        98
VIS    2025250    200200   23.4700  146.8200       9.0        95       937        98
VIS    2025250    200200   23.4600  146.4400       9.8        88       961       100
VIS    2025250    200200   23.4800  146.4300       8.7        91       954        99
VIS    2025250    200200   23.4600  146.3900      11.7        84       945        96
VIS    2025250    200200   23.4600  146.3400      11.1        88       926        98
VIS    2025250    200200   23.4600  146.3400      11.0        89       923        97
VIS    2025250    200200   23.4800  146.3100      10.6        91       915        99
VIS    2025250    200200   23.4800  146.2700      11.0        87       928        97
VIS    2025250    200200   23.4800  146.2600      11.1        88       928        97
VIS    2025250    200200   23.4700  146.2400      10.8        90       957        99
VIS    2025250    200200   23.4700  146.2000      11.1        90       981        99
VIS    2025250    200200   23.4600  146.1800      10.5        93       981        99
VIS    2025250    200200   23.4800  146.1600      10.8        91       975        98
VIS    2025250    200200   23.4800  146.1300      10.6        91       975        97
VIS    2025250    200200   23.4600  146.0900      10.6        91       974        99
VIS    2025250    200200   23.4700  146.0800      10.7        91       990        98
VIS    2025250    200200   23.4500  145.4300      10.7        94       927        95
VIS    2025250    200200   23.4500  145.4300      10.7        94       927        97
VIS    2025250    200200   23.4500  145.3900      10.7        93       929        97
VIS    2025250    200200   23.4500  145.3700      10.3        93       944        95
VIS    2025250    200200   23.4600  145.3500       9.9        92       945        93
VIS    2025250    200200   23.4500  145.3100      10.4        89       931        94
VIS    2025250    200200   23.4500  145.3000      10.4        88       952        97
VIS    2025250    200200   23.4600  144.4800      10.9        91       995        91
VIS    2025250    200200   23.4500  144.4500      10.7        88       972        95
VIS    2025250    200200   23.4600  144.4300      10.8        89       964        98
VIS    2025250    200200   23.4500  144.3900      10.5        92       927        99
VIS    2025250    200200   23.4500  144.3800      10.9        93       918        99
VIS    2025250    200200   23.4400  144.3500      11.6        91       918        94
VIS    2025250    200200   23.4600  144.3400      11.6        89       932        98
VIS    2025250    200200   23.4400  143.7100      10.5        94       993        99
VIS    2025250    200200   23.4300  143.7000      10.5        93       993       100
VIS    2025250    200200   23.4400  143.6600      10.4        92       992        99
VIS    2025250    200200   23.4400  143.6300      10.4        90       981        99
VIS    2025250    200200   23.4400  143.6300      10.4        90       981        99
VIS    2025250    200200   23.4500  143.5800      10.7        92       997        99
VIS    2025250    200200   23.4400  143.5600      10.5        95       995       100
VIS    2025250    200200   23.4400  143.5400      10.3        95       972        99
VIS    2025250    200200   23.4400  143.5200      10.2        92       940       100
VIS    2025250    200200   23.4300  143.4900      10.1        91       944       100
VIS    2025250    200200   23.4500  143.4600      10.0        95       970        99
VIS    2025250    200200   23.4400  143.4500      10.1        96       960        99
VIS    2025250    200200   23.4500  143.4100       9.7        98       960        99
VIS    2025250    200200   23.4300  143.3900       9.4        98       958        97
VIS    2025250    200200   23.4300  143.3500       9.9       100       986        95
VIS    2025250    200200   23.4300  143.3400      10.0        98       994        97
VIS    2025250    200200   23.4300  143.2700       9.8        97       993        99
VIS    2025250    200200   23.4300  143.2400       9.9        96       993       100
VIS    2025250    200200   23.4300  143.2000       9.6        97       991        96
VIS    2025250    200200   23.4300  143.0400       9.9        99       995        99
VIS    2025250    200200   23.4300  143.0200       9.8        98       992        99
VIS    2025250    200200   23.5400  151.9400       6.2       108       963        99
VIS    2025250    200200   23.5400  151.9200       6.2       106       980       100
VIS    2025250    200200   23.5200  151.8300       5.6        98       977        90
VIS    2025250    200200   23.4900  150.1200       7.5       100       960        93
VIS    2025250    200200   23.5100  150.1000       7.5       101       946        97
VIS    2025250    200200   23.5100  150.0900       7.6       101       946        97
VIS    2025250    200200   23.5000  149.9700       8.3       104       915        97
VIS    2025250    200200   23.4800  149.9600       7.4       102       915        99
VIS    2025250    200200   23.5000  149.9300       7.1        98       905        95
VIS    2025250    200200   23.4900  149.8900       6.7       101       896        93
VIS    2025250    200200   23.4900  149.8700       6.9       106       878        91
VIS    2025250    200200   23.4800  149.7900       9.2       109       872        98
VIS    2025250    200200   23.5000  149.7600       8.1       101       875        99
VIS    2025250    200200   23.4800  149.6000       9.2       123       840        91
VIS    2025250    200200   23.4800  149.6000       9.1       121       840        92
VIS    2025250    200200   23.4900  149.5500       8.3       110       865        98
VIS    2025250    200200   23.4600  148.1300       9.8        93       989        99
VIS    2025250    200200   23.4600  148.1000      10.3        98       966        99
VIS    2025250    200200   23.4800  148.0900      10.2        97       989        99
VIS    2025250    200200   23.4700  148.0700      10.8       101       949        98
VIS    2025250    200200   23.4600  147.9200       9.9        99       912        98
VIS    2025250    200200   23.4700  147.9000       9.3        95       912        99
VIS    2025250    200200   23.4600  147.8700       9.0        96       897        99
VIS    2025250    200200   23.4700  147.8700       9.2        99       897        98
VIS    2025250    200200   23.4700  147.8300       9.8        99       889        97
VIS    2025250    200200   23.4500  147.8100       9.7        97       887        97
VIS    2025250    200200   23.4700  147.7900      10.2        97       889        97
VIS    2025250    200200   23.4600  147.7600      10.0        95       888        98
VIS    2025250    200200   23.4500  147.7200       9.5        87       892        96
VIS    2025250    200200   23.4600  147.6900       9.9        90       893        96
VIS    2025250    200200   23.4600  147.6700       9.6        94       892        98
VIS    2025250    200200   23.4500  147.6400       9.2        97       892        99
VIS    2025250    200200   23.4600  147.6300       9.0        95       892        98
VIS    2025250    200200   23.4600  147.5900       9.6        93       890        95
VIS    2025250    200200   23.4500  147.5600       9.8        94       890        94
VIS    2025250    200200   23.4700  147.5500       9.6        94       890        93
VIS    2025250    200200   23.4700  147.5100       9.6        94       891        96
VIS    2025250    200200   23.4700  147.4900       9.5        94       893        97
VIS    2025250    200200   23.4500  147.4800       9.3        93       893        98
VIS    2025250    200200   23.4500  147.4400       9.7        90       896        96
VIS    2025250    200200   23.4500  147.4200      10.0        88       896        96
VIS    2025250    200200   23.4700  147.3800       9.9        94       894        98
VIS    2025250    200200   23.4500  147.3800      10.0        91       895        97
VIS    2025250    200200   23.4600  147.3300      10.7        99       894        98
VIS    2025250    200200   23.4700  147.3300      10.7        99       894        97
VIS    2025250    200200   23.4600  147.2900       9.9        95       893        98
VIS    2025250    200200   23.4600  147.2600       9.3        92       896        98
VIS    2025250    200200   23.4600  147.2500       9.4        92       896        98
VIS    2025250    200200   23.4400  147.2100       9.0        92       897        98
VIS    2025250    200200   23.4600  147.1900       9.4        91       897        98
VIS    2025250    200200   23.4600  147.1700      10.1        92       899        98
VIS    2025250    200200   23.4400  147.1300       9.1        86       902        97
VIS    2025250    200200   23.4400  147.1200       9.2        85       902        97
VIS    2025250    200200   23.4600  147.0900       8.7        88       901        97
VIS    2025250    200200   23.4600  147.0700       8.8        87       902        95
VIS    2025250    200200   23.4600  147.0300       9.3        95       903        99
VIS    2025250    200200   23.4400  147.0000       9.7       100       904        96
VIS    2025250    200200   23.4600  146.9900       8.7       102       904        97
VIS    2025250    200200   23.4600  146.9700       7.9       100       905        93
VIS    2025250    200200   23.4400  146.9300       9.2        94       906        99
VIS    2025250    200200   23.4600  146.9000       8.9        96       908        99
VIS    2025250    200200   23.4400  146.8900       9.0        94       908        99
VIS    2025250    200200   23.4500  146.8500       8.9        94       911        99
VIS    2025250    200200   23.4500  146.8400       9.0        94       911        99
VIS    2025250    200200   23.4400  146.8100       9.2        96       931        96
VIS    2025250    200200   23.4600  146.7900       9.6        99       965        96
VIS    2025250    200200   23.4400  146.4400      11.5        84       961        95
VIS    2025250    200200   23.4400  146.4200      11.7        84       957        95
VIS    2025250    200200   23.4400  146.4000      12.2        88       951        95
VIS    2025250    200200   23.4300  146.3900      12.4        89       946        96
VIS    2025250    200200   23.4300  146.3500      11.9        93       927        97
VIS    2025250    200200   23.4500  146.3300      10.7        90       923        98
VIS    2025250    200200   23.4400  146.3100      10.6        92       923        99
VIS    2025250    200200   23.4500  146.2700      10.7        92       939        99
VIS    2025250    200200   23.4500  146.2500      10.7        93       947        99
VIS    2025250    200200   23.4400  146.2300      10.6        94       961        99
VIS    2025250    200200   23.4300  146.2100      10.5        93       963        99
VIS    2025250    200200   23.4400  146.1800      10.5        93       976        99
VIS    2025250    200200   23.4400  146.1400      10.8        93       968        98
VIS    2025250    200200   23.4400  146.1100      10.6        92       941        98
VIS    2025250    200200   23.4400  146.1100      10.6        91       939        99
VIS    2025250    200200   23.4500  146.0800      10.8        90       941        99
VIS    2025250    200200   23.4300  145.5700      10.7        91       982        90
VIS    2025250    200200   23.4400  145.4300      10.9        93       930        96
VIS    2025250    200200   23.4200  145.4000      11.1        91       934        98
VIS    2025250    200200   23.4400  145.3800      10.5        93       940        97
VIS    2025250    200200   23.4400  145.3600      10.3        93       940        96
VIS    2025250    200200   23.4200  145.3200      10.6        92       923        94
VIS    2025250    200200   23.4200  145.3000      10.4        90       930        93
VIS    2025250    200200   23.4100  144.4500      10.5        91       984        98
VIS    2025250    200200   23.4100  144.4500      10.5        91       983        98
VIS    2025250    200200   23.4200  144.4100      10.5        90       963       100
VIS    2025250    200200   23.4300  144.3900      10.6        91       927        99
VIS    2025250    200200   23.4300  144.3500      11.5        90       919        94
VIS    2025250    200200   23.4300  144.3500      11.4        90       919        93
VIS    2025250    200200   23.4200  143.7200      10.4        92       986       100
VIS    2025250    200200   23.4200  143.7000      10.4        92       986       100
VIS    2025250    200200   23.4200  143.6700      10.3        91       986       100
VIS    2025250    200200   23.4200  143.6500      10.3        91       986       100
VIS    2025250    200200   23.4100  143.6200      10.3        92       979       100
VIS    2025250    200200   23.4100  143.6100      10.2        91       975       100
VIS    2025250    200200   23.4100  143.5700      10.6        92       967       100
VIS    2025250    200200   23.4200  143.5100      10.1        91       972        96
VIS    2025250    200200   23.4200  143.5000      10.1        89       944        98
VIS    2025250    200200   23.4100  143.4200       9.9        95       939       100
VIS    2025250    200200   23.4000  143.3700      10.0        97       959        98
VIS    2025250    200200   23.4000  143.3500      10.1        96       960        99
VIS    2025250    200200   23.4100  143.2700       9.7        96       979       100
VIS    2025250    200200   23.4200  143.2400       9.8        96       985       100
VIS    2025250    200200   23.4000  143.2200       9.6        96       985        99
VIS    2025250    200200   23.4000  143.2000       9.5        96       980        98
VIS    2025250    200200   23.4000  143.0300       9.8        99       989        99
VIS    2025250    200200   23.4100  143.0200       9.7        99       992        99
VIS    2025250    200200   23.4900  151.9100       6.3        89       980        92
VIS    2025250    200200   23.5000  151.9000       6.0        88       975        96
VIS    2025250    200200   23.4800  150.1200       7.4       101       960        95
VIS    2025250    200200   23.4800  150.1000       7.2        99       946        96
VIS    2025250    200200   23.4600  150.0700       6.9       101       954        96
VIS    2025250    200200   23.4700  149.9700       8.4       101       953        93
VIS    2025250    200200   23.4800  149.9500       7.4       100       920        98
VIS    2025250    200200   23.4800  149.8700       7.2       109       875        92
VIS    2025250    200200   23.4500  149.8100       8.0       108       872        99
VIS    2025250    200200   23.4500  149.7800       9.3       103       873        98
VIS    2025250    200200   23.4500  149.7700       9.3       102       873        98
VIS    2025250    200200   23.4500  149.7400       8.9       101       870        96
VIS    2025250    200200   23.4600  149.5700       8.2       113       904        98
VIS    2025250    200200   23.4700  149.5500       8.2       109       904        98
VIS    2025250    200200   23.4700  149.5400       8.1       108       919        98
VIS    2025250    200200   23.4700  149.5100       7.7       105       952        96
VIS    2025250    200200   23.4500  148.1500       9.4        86       989        96
VIS    2025250    200200   23.4300  148.1200       9.5        91       966        99
VIS    2025250    200200   23.4400  148.1100       9.7        94       962        99
VIS    2025250    200200   23.4400  148.0800      11.5       106       947        92
VIS    2025250    200200   23.4300  147.9900      10.5       108       931        91
VIS    2025250    200200   23.4300  147.9700      10.3       106       924        95
VIS    2025250    200200   23.4400  147.9500       9.9       101       909        98
VIS    2025250    200200   23.4400  147.9300       9.8        98       905        97
VIS    2025250    200200   23.4400  147.8900       8.7        89       894        98
VIS    2025250    200200   23.4400  147.8700       8.5        88       893        98
VIS    2025250    200200   23.4500  147.8500       9.1        94       888        99
VIS    2025250    200200   23.4300  147.8300       9.4        95       886        98
VIS    2025250    200200   23.4500  147.8100       9.7        97       886        98
VIS    2025250    200200   23.4300  147.7600       9.7        98       886        99
VIS    2025250    200200   23.4300  147.7500       9.6        97       886        99
VIS    2025250    200200   23.4400  147.7200       9.2        90       890        97
VIS    2025250    200200   23.4400  147.7000       9.4        88       890        96
VIS    2025250    200200   23.4200  147.6700       9.9        95       889        98
VIS    2025250    200200   23.4400  147.6400       9.3        98       889        99
VIS    2025250    200200   23.4400  147.6300       9.2        94       888        98
VIS    2025250    200200   23.4200  147.5800       9.4        94       891        99
VIS    2025250    200200   23.4400  147.5800       9.8        95       890        98
VIS    2025250    200200   23.4400  147.5300       9.6        91       890        94
VIS    2025250    200200   23.4200  147.5000       9.7        92       895        98
VIS    2025250    200200   23.4200  147.4900       9.3        92       895        98
VIS    2025250    200200   23.4300  147.4600       9.5        90       898        97
VIS    2025250    200200   23.4400  147.4500       9.6        90       897        97
VIS    2025250    200200   23.4300  147.4200      10.4        88       897        95
VIS    2025250    200200   23.4200  147.3700       9.9        88       897        94
VIS    2025250    200200   23.4200  147.3700       9.8        89       896        95
VIS    2025250    200200   23.4400  147.3500       9.8        97       894        98
VIS    2025250    200200   23.4400  147.3200      10.4        97       894        97
VIS    2025250    200200   23.4200  147.2800       9.3        96       896        99
VIS    2025250    200200   23.4300  147.2500       9.0        94       896        99
VIS    2025250    200200   23.4300  147.2300       9.0        93       897        98
VIS    2025250    200200   23.4300  147.2200       8.7        92       897        98
VIS    2025250    200200   23.4300  147.1700       8.1        86       901        95
VIS    2025250    200200   23.4200  147.1600       8.1        83       902        95
VIS    2025250    200200   23.4300  147.1200       8.6        82       902        95
VIS    2025250    200200   23.4300  147.1000       9.2        82       904        95
VIS    2025250    200200   23.4200  147.0700      10.4        86       905        97
VIS    2025250    200200   23.4300  147.0500      10.2        91       905        97
VIS    2025250    200200   23.4300  147.0200      10.1        97       904       100
VIS    2025250    200200   23.4100  147.0000      10.3        94       905        99
VIS    2025250    200200   23.4300  146.9800       9.5        95       905        98
VIS    2025250    200200   23.4100  146.9400       9.8        90       906        98
VIS    2025250    200200   23.4100  146.9200      10.0        92       906        99
VIS    2025250    200200   23.4200  146.8900      10.0        93       906        99
VIS    2025250    200200   23.4200  146.8700       9.8        93       905        99
VIS    2025250    200200   23.4300  146.8500       9.2        92       908        99
VIS    2025250    200200   23.4300  146.8100       9.3        93       937        95
VIS    2025250    200200   23.4200  146.7800       9.0        95       963        91
VIS    2025250    200200   23.4200  146.4400      11.6        87       969        98
VIS    2025250    200200   23.4100  146.4100      11.9        91       951        97
VIS    2025250    200200   23.4300  146.4000      12.3        89       946        96
VIS    2025250    200200   23.4100  146.3600      12.5        97       929        93
VIS    2025250    200200   23.4100  146.3500      12.2        97       917        94
VIS    2025250    200200   23.4100  146.3200      11.7        97       911        96
VIS    2025250    200200   23.4100  146.2800      11.5        98       911        96
VIS    2025250    200200   23.4300  146.2700      11.1        97       923        98
VIS    2025250    200200   23.4300  146.2400      10.8        96       945        99
VIS    2025250    200200   23.4100  146.2100      10.7        92       944        99
VIS    2025250    200200   23.4200  146.1800      10.6        92       949        99
VIS    2025250    200200   23.4100  146.1700      10.8        92       949        99
VIS    2025250    200200   23.4300  146.1400      10.8        92       944        98
VIS    2025250    200200   23.4200  146.1200      10.5        90       923        96
VIS    2025250    200200   23.4000  146.1000      10.6        89       920        95
VIS    2025250    200200   23.4200  145.4900      11.8        94       955        95
VIS    2025250    200200   23.4000  145.4600      11.6        89       949        97
VIS    2025250    200200   23.4100  145.4400      11.4        90       945        98
VIS    2025250    200200   23.4000  145.4200      11.4        88       934        98
VIS    2025250    200200   23.4000  145.3900      11.4        88       935        98
VIS    2025250    200200   23.4100  145.3700      10.6        91       935        96
VIS    2025250    200200   23.4100  145.3300      10.7        90       923        95
VIS    2025250    200200   23.4100  145.3200      10.8        90       927        96
VIS    2025250    200200   23.4000  145.3000      10.6        89       941        94
VIS    2025250    200200   23.4000  145.2800      10.6        90       960        96
VIS    2025250    200200   23.4100  144.4500      10.6        91       984        99
VIS    2025250    200200   23.4100  144.4200      10.6        90       971       100
VIS    2025250    200200   23.3900  144.4100      11.2        91       973        99
VIS    2025250    200200   23.4000  144.3900      10.7        90       930        99
VIS    2025250    200200   23.4000  144.3500      10.0        91       923        97
VIS    2025250    200200   23.4000  143.7000      10.3        91       986       100
VIS    2025250    200200   23.3800  143.6700      10.1        91       978       100
VIS    2025250    200200   23.3800  143.6300      10.3        93       979        99
VIS    2025250    200200   23.3900  143.6100      10.3        93       975        99
VIS    2025250    200200   23.4000  143.5700      10.6        93       966       100
VIS    2025250    200200   23.3900  143.3800      10.1        96       953        98
VIS    2025250    200200   23.4000  143.3700      10.0        96       959        98
VIS    2025250    200200   23.4000  143.3400      10.1        94       963        99
VIS    2025250    200200   23.3800  143.3100       9.9        90       988       100
VIS    2025250    200200   23.3900  143.2800       9.7        93       979       100
VIS    2025250    200200   23.3900  143.2700       9.5        94       979       100
VIS    2025250    200200   23.4000  143.2200       9.5        95       985        99
VIS    2025250    200200   23.3900  143.2200       9.5        95       980        99
VIS    2025250    200200   23.3800  143.0500      10.3        98       989        99
VIS    2025250    200200   23.3800  143.0300      10.2        99       975        99
VIS    2025250    200200   23.4700  151.9100       6.8        91       975        92
VIS    2025250    200200   23.4700  151.8900       6.5        87       963        96
VIS    2025250    200200   23.4400  150.1100       8.0       108       949        92
VIS    2025250    200200   23.4400  150.1100       7.7       106       949        93
VIS    2025250    200200   23.4400  150.0600       7.2       101       935        97
VIS    2025250    200200   23.4500  149.9600       8.1        97       940        95
VIS    2025250    200200   23.4400  149.9400       8.0       101       903        99
VIS    2025250    200200   23.4500  149.9300       6.9       105       903        95
VIS    2025250    200200   23.4300  149.8400       6.9       112       873        91
VIS    2025250    200200   23.4400  149.8200       6.8       111       873        91
VIS    2025250    200200   23.4300  149.7700       7.6       104       875        98
VIS    2025250    200200   23.4500  149.7700       9.1       103       873        98
VIS    2025250    200200   23.4400  149.5700       7.2       120       903        91
VIS    2025250    200200   23.4300  149.5500       7.0       110       919        91
VIS    2025250    200200   23.4300  149.5300       7.0       105       964        92
VIS    2025250    200200   23.4100  148.1200      10.0        93       963        99
VIS    2025250    200200   23.4200  148.0900      10.3       103       955        97
VIS    2025250    200200   23.4200  148.0900      11.0       106       949        94
VIS    2025250    200200   23.4100  148.0200      10.8       107       945        92
VIS    2025250    200200   23.4200  147.9900      10.1       106       930        95
VIS    2025250    200200   23.4200  147.9700       9.7       102       909        99
VIS    2025250    200200   23.4100  147.9400       8.6        86       892        93
VIS    2025250    200200   23.4000  147.9300       8.5        84       892        93
VIS    2025250    200200   23.4200  147.9000       8.7        89       892        97
VIS    2025250    200200   23.4100  147.8600       9.0        89       885        98
VIS    2025250    200200   23.4000  147.8300       9.5        92       886        98
VIS    2025250    200200   23.4000  147.8200       9.5        94       886        98
VIS    2025250    200200   23.4000  147.7900       9.2        95       883        99
VIS    2025250    200200   23.4000  147.7700       9.6        97       883        99
VIS    2025250    200200   23.4000  147.7400       9.4        99       887        99
VIS    2025250    200200   23.4000  147.7000       9.1        92       889        98
VIS    2025250    200200   23.4000  147.6900       9.5        91       888        97
VIS    2025250    200200   23.4100  147.6700       9.9        95       888        98
VIS    2025250    200200   23.4100  147.6300       9.0        93       888        98
VIS    2025250    200200   23.4000  147.6100       9.0        90       891        97
VIS    2025250    200200   23.4200  147.5800       9.3        94       891        98
VIS    2025250    200200   23.4200  147.5500       9.8        93       891        95
VIS    2025250    200200   23.4200  147.5400      10.1        91       892        97
VIS    2025250    200200   23.4200  147.5200      10.1        92       894        97
VIS    2025250    200200   23.4100  147.4800       9.0        93       899        97
VIS    2025250    200200   23.4000  147.4500       9.5        91       899        96
VIS    2025250    200200   23.4000  147.4400       9.9        89       899        95
VIS    2025250    200200   23.4000  147.4100      10.2        89       900        95
VIS    2025250    200200   23.4000  147.3900       9.9        88       899        93
VIS    2025250    200200   23.3900  147.3600       9.6        90       896        96
VIS    2025250    200200   23.4100  147.3300       9.6        94       893        97
VIS    2025250    200200   23.4000  147.3200       9.4        94       896        98
VIS    2025250    200200   23.4000  147.2700       9.2        95       897        99
VIS    2025250    200200   23.3900  147.2500       9.1        93       898        99
VIS    2025250    200200   23.4000  147.2300       8.7        90       898        98
VIS    2025250    200200   23.3900  147.2000       8.4        88       903        97
VIS    2025250    200200   23.4000  147.1700       8.0        81       902        94
VIS    2025250    200200   23.3900  147.1500       8.1        78       906        92
VIS    2025250    200200   23.4100  147.1300       8.3        79       904        93
VIS    2025250    200200   23.4100  147.0900       9.9        83       905        96
VIS    2025250    200200   23.4100  147.0700      10.6        86       906        97
VIS    2025250    200200   23.4000  147.0500      10.5        86       906        97
VIS    2025250    200200   23.3900  147.0300      10.1        85       908        97
VIS    2025250    200200   23.4000  146.9900      10.0        91       907        98
VIS    2025250    200200   23.3900  146.9800       9.8        90       907        98
VIS    2025250    200200   23.3900  146.9500      10.1        92       907        99
VIS    2025250    200200   23.4100  146.9100      10.1        92       906        98
VIS    2025250    200200   23.3900  146.8900      10.1        91       906        99
VIS    2025250    200200   23.4000  146.8800      10.0        91       906        99
VIS    2025250    200200   23.4000  146.8600       9.5        91       905        98
VIS    2025250    200200   23.4000  146.4700      10.5        88       981       100
VIS    2025250    200200   23.4000  146.4400      11.2        87       969        99
VIS    2025250    200200   23.4000  146.4200      11.5        89       958        99
VIS    2025250    200200   23.4000  146.4100      11.7        91       958        98
VIS    2025250    200200   23.3800  146.3800      12.1        94       942        97
VIS    2025250    200200   23.4000  146.3500      12.4        97       917        93
VIS    2025250    200200   23.4000  146.3300      12.0        96       910        93
VIS    2025250    200200   23.3900  146.2900      11.6        96       911        97
VIS    2025250    200200   23.3800  146.2600      10.7        93       912        99
VIS    2025250    200200   23.3900  146.2500      10.6        92       912        99
VIS    2025250    200200   23.3900  146.2300      10.5        92       918        99
VIS    2025250    200200   23.4000  146.1900      10.7        92       949        98
VIS    2025250    200200   23.4000  146.1700      10.8        92       949        99
VIS    2025250    200200   23.3900  146.1500      11.0        91       944        98
VIS    2025250    200200   23.3900  146.1300      11.2        90       922        97
VIS    2025250    200200   23.3700  145.6500       9.9        89       982        96
VIS    2025250    200200   23.3900  145.5100      11.2        96       983        92
VIS    2025250    200200   23.3900  145.4900      11.6        94       976        95
VIS    2025250    200200   23.3700  145.4500      11.4        87       958        99
VIS    2025250    200200   23.3800  145.4400      11.5        87       945        98
VIS    2025250    200200   23.3700  145.4200      11.4        87       934        98
VIS    2025250    200200   23.3900  145.3900      11.5        88       934        98
VIS    2025250    200200   23.3900  145.3500      11.0        87       948        98
VIS    2025250    200200   23.3900  145.3400      11.0        87       948        98
VIS    2025250    200200   23.3900  145.3100      10.9        89       949        97
VIS    2025250    200200   23.3900  145.2900      10.7        90       960        97
VIS    2025250    200200   23.3800  144.5000      10.4        87       996        99
VIS    2025250    200200   23.3800  144.4700      10.9        92       983       100
VIS    2025250    200200   23.3700  144.4700      10.9        92       983        99
VIS    2025250    200200   23.3700  144.3800      10.5        92       953        96
VIS    2025250    200200   23.3800  144.3500       9.7        92       924        97
VIS    2025250    200200   23.3700  143.3400       9.8        92       980        99
VIS    2025250    200200   23.3700  143.3100       9.9        91       988       100
VIS    2025250    200200   23.3500  143.1300      10.0        95       999        96
VIS    2025250    200200   23.3500  143.1000       9.7        97       987        91
VIS    2025250    200200   23.3500  143.0800      10.0        97       972        95
VIS    2025250    200200   23.3500  143.0500      10.4        97       958        99
VIS    2025250    200200   23.3500  143.0300      10.4        98       952        95
VIS    2025250    200200   23.4500  151.9000       7.1        85       963        92
VIS    2025250    200200   23.4500  151.8800       6.7        87       924        96
VIS    2025250    200200   23.4500  151.8600       6.4        88       924        93
VIS    2025250    200200   23.4300  150.0700       7.8       103       935        96
VIS    2025250    200200   23.4100  150.0200       8.3       111       945        91
VIS    2025250    200200   23.4200  149.9500       8.5       101       903        98
VIS    2025250    200200   23.4300  149.9400       8.3       100       903        98
VIS    2025250    200200   23.4100  149.8500       6.8       105       877        93
VIS    2025250    200200   23.4100  149.8400       6.6       105       877        92
VIS    2025250    200200   23.4000  148.1400      10.5        93       969        99
VIS    2025250    200200   23.3800  148.1200      11.0        95       965        98
VIS    2025250    200200   23.3900  148.1000      10.6        97       963        98
VIS    2025250    200200   23.3900  148.0600      11.2       105       955        95
VIS    2025250    200200   23.3800  148.0400      10.5        98       949        99
VIS    2025250    200200   23.3800  148.0200       9.4        91       937        99
VIS    2025250    200200   23.3800  147.9800       8.7        85       897        95
VIS    2025250    200200   23.3800  147.9600       8.8        87       893        96
VIS    2025250    200200   23.3900  147.9300       8.7        86       890        96
VIS    2025250    200200   23.4000  147.9200       8.5        85       887        95
VIS    2025250    200200   23.3800  147.8800       9.2        89       884        96
VIS    2025250    200200   23.3800  147.8700       9.2        88       883        97
VIS    2025250    200200   23.3700  147.8400       9.3        93       883        98
VIS    2025250    200200   23.3700  147.8200       9.2        95       883        99
VIS    2025250    200200   23.3900  147.7900       9.1        94       885        99
VIS    2025250    200200   23.3800  147.7500       9.3        97       886       100
VIS    2025250    200200   23.3800  147.7400       9.4        98       886        99
VIS    2025250    200200   23.3800  147.7100       9.3        92       889        97
VIS    2025250    200200   23.3900  147.6900       9.5        91       888        97
VIS    2025250    200200   23.3700  147.6600       8.9        91       888        95
VIS    2025250    200200   23.3800  147.6300       8.8        90       888        96
VIS    2025250    200200   23.3900  147.6100       8.9        89       891        96
VIS    2025250    200200   23.3800  147.5800       9.1        88       893        95
VIS    2025250    200200   23.3800  147.5500       9.6        89       892        95
VIS    2025250    200200   23.3700  147.5300       9.8        88       895        96
VIS    2025250    200200   23.3900  147.5100       9.7        89       896        97
VIS    2025250    200200   23.3900  147.4800       9.2        92       899        98
VIS    2025250    200200   23.3700  147.4500       9.5        89       899        97
VIS    2025250    200200   23.3800  147.4200      10.1        88       899        96
VIS    2025250    200200   23.3900  147.4000      10.0        90       900        95
VIS    2025250    200200   23.3700  147.3600       9.6        88       898        97
VIS    2025250    200200   23.3700  147.3400       9.6        88       897        97
VIS    2025250    200200   23.3700  147.3300       9.5        89       898        97
VIS    2025250    200200   23.3700  147.2900       9.5        90       898        96
VIS    2025250    200200   23.3900  147.2700       9.2        94       898        99
VIS    2025250    200200   23.3700  147.2600       9.2        91       898        98
VIS    2025250    200200   23.3800  147.2200       8.7        89       903        98
VIS    2025250    200200   23.3800  147.2000       8.6        88       904        97
VIS    2025250    200200   23.3800  147.1700       8.3        84       906        95
VIS    2025250    200200   23.3800  147.1600       8.5        83       907        95
VIS    2025250    200200   23.3600  147.1100       9.7        91       907        98
VIS    2025250    200200   23.3600  147.1000       9.8        91       907        99
VIS    2025250    200200   23.3600  147.0700       9.2        87       909        97
VIS    2025250    200200   23.3800  147.0300      10.0        85       909        96
VIS    2025250    200200   23.3800  147.0300      10.1        85       909        97
VIS    2025250    200200   23.3700  146.9800       9.6        89       908        97
VIS    2025250    200200   23.3600  146.9700       9.4        91       908        99
VIS    2025250    200200   23.3700  146.9300      10.0        93       907        99
VIS    2025250    200200   23.3700  146.9300      10.1        93       907        99
VIS    2025250    200200   23.3600  146.8800      10.0        87       909        98
VIS    2025250    200200   23.3700  146.8700       9.9        88       909        98
VIS    2025250    200200   23.3800  146.4700      10.3        87       991        99
VIS    2025250    200200   23.3600  146.4300      11.1        83       978        97
VIS    2025250    200200   23.3600  146.4200      11.3        86       977        98
VIS    2025250    200200   23.3600  146.3700      12.0        92       931        97
VIS    2025250    200200   23.3600  146.3700      12.0        91       931        96
VIS    2025250    200200   23.3600  146.3400      11.7        90       916        92
VIS    2025250    200200   23.3600  146.3000      11.2        90       916        97
VIS    2025250    200200   23.3700  146.2700      10.7        93       912        99
VIS    2025250    200200   23.3600  146.2600      10.0        89       917        96
VIS    2025250    200200   23.3600  146.2400       9.9        90       932        97
VIS    2025250    200200   23.3700  146.2100      10.3        90       962        95
VIS    2025250    200200   23.3600  146.1800      11.0        89       969        98
VIS    2025250    200200   23.3600  146.1500      11.3        88       949        99
VIS    2025250    200200   23.3600  146.1400      11.3        88       931        99
VIS    2025250    200200   23.3500  145.7200      10.4        94       980        95
VIS    2025250    200200   23.3600  145.6400      10.3        91       978        97
VIS    2025250    200200   23.3500  145.4500      11.2        89       962        98
VIS    2025250    200200   23.3500  145.4400      11.2        89       962        99
VIS    2025250    200200   23.3500  145.4100      11.0        86       947        97
VIS    2025250    200200   23.3500  145.3800      11.3        85       947        96
VIS    2025250    200200   23.3500  145.3700      11.3        83       948        96
VIS    2025250    200200   23.3500  145.3400      11.4        86       954        98
VIS    2025250    200200   23.3400  145.3000      11.1        92       980        99
VIS    2025250    200200   23.3500  145.2700      11.0        91       960        99
VIS    2025250    200200   23.3600  145.2600      10.8        89       970       100
VIS    2025250    200200   23.3600  144.4700      11.1        91       988        99
VIS    2025250    200200   23.3500  144.3600       9.8        91       956        94
VIS    2025250    200200   23.3500  144.3500       9.5        90       956        96
VIS    2025250    200200   23.3200  143.1100       9.5        95       987        98
VIS    2025250    200200   23.3200  143.0700      10.0        95       958       100
VIS    2025250    200200   23.3300  143.0200      10.5       100       952        92
VIS    2025250    200200   23.4200  151.9000       7.1        81       928        92
VIS    2025250    200200   23.4300  151.8900       6.7        84       917        95
VIS    2025250    200200   23.4200  151.8100       6.5       101       940        91
VIS    2025250    200200   23.4300  151.8100       6.4        99       958        91
VIS    2025250    200200   23.3800  150.0600       9.4       111       909        93
VIS    2025250    200200   23.3800  149.9600       8.8       108       905        96
VIS    2025250    200200   23.3800  149.9600       8.4       107       900        97
VIS    2025250    200200   23.3900  149.8300       7.2       108       879        95
VIS    2025250    200200   23.3800  149.7400       7.3       103       887        95
VIS    2025250    200200   23.3600  148.1500      10.9        86       991        92
VIS    2025250    200200   23.3700  148.1100      10.7        96       967        99
VIS    2025250    200200   23.3600  148.0700      10.4       100       958        98
VIS    2025250    200200   23.3700  148.0500      10.3        97       943        99
VIS    2025250    200200   23.3600  148.0300       9.1        89       904        98
VIS    2025250    200200   23.3500  148.0000       8.8        82       894        92
VIS    2025250    200200   23.3700  147.9700       8.8        85       894        95
VIS    2025250    200200   23.3700  147.9700       8.9        86       894        96
VIS    2025250    200200   23.3500  147.9300       9.3        93       886        99
VIS    2025250    200200   23.3700  147.9000       9.2        89       885        97
VIS    2025250    200200   23.3700  147.8700       9.3        88       883        97
VIS    2025250    200200   23.3700  147.8500       9.3        92       883        98
VIS    2025250    200200   23.3700  147.8400       9.3        93       883        99
VIS    2025250    200200   23.3500  147.8000       8.6        94       886        99
VIS    2025250    200200   23.3500  147.7700       8.6        93       886        99
VIS    2025250    200200   23.3700  147.7500       9.1        94       886       100
VIS    2025250    200200   23.3500  147.7400       9.1        92       890        98
VIS    2025250    200200   23.3700  147.6900       9.3        91       889        96
VIS    2025250    200200   23.3600  147.6600       8.8        91       888        94
VIS    2025250    200200   23.3700  147.6600       8.8        91       888        95
VIS    2025250    200200   23.3700  147.6100       8.7        87       889        96
VIS    2025250    200200   23.3600  147.6100       8.8        85       889        95
VIS    2025250    200200   23.3600  147.5700       9.4        85       892        93
VIS    2025250    200200   23.3500  147.5600       9.8        85       892        93
VIS    2025250    200200   23.3500  147.5300       9.7        86       895        94
VIS    2025250    200200   23.3500  147.4900       9.2        89       899        98
VIS    2025250    200200   23.3500  147.4600       9.2        88       899        97
VIS    2025250    200200   23.3400  147.4400       9.5        85       899        96
VIS    2025250    200200   23.3400  147.4100       9.8        85       899        95
VIS    2025250    200200   23.3400  147.3900       9.7        86       899        95
VIS    2025250    200200   23.3400  147.3700       9.7        88       899        96
VIS    2025250    200200   23.3500  147.3300       9.4        90       899        98
VIS    2025250    200200   23.3400  147.3200       9.1        90       899        98
VIS    2025250    200200   23.3400  147.2900       9.4        86       900        95
VIS    2025250    200200   23.3500  147.2700       9.5        87       900        95
VIS    2025250    200200   23.3400  147.2500       9.3        88       902        96
VIS    2025250    200200   23.3400  147.2200       8.7        88       904        96
VIS    2025250    200200   23.3600  147.2000       8.6        88       905        97
VIS    2025250    200200   23.3500  147.1700       8.3        87       907        97
VIS    2025250    200200   23.3400  147.1300       9.0        90       908        96
VIS    2025250    200200   23.3400  147.1200       9.2        91       908        97
VIS    2025250    200200   23.3600  147.0800       9.5        89       909        98
VIS    2025250    200200   23.3500  147.0600       8.9        86       911        96
VIS    2025250    200200   23.3400  147.0200       9.4        87       912        98
VIS    2025250    200200   23.3400  147.0100       9.6        87       912        98
VIS    2025250    200200   23.3600  146.9900       9.3        88       909        98
VIS    2025250    200200   23.3500  146.9700       9.2        90       909        98
VIS    2025250    200200   23.3400  146.9300       9.6        91       912        98
VIS    2025250    200200   23.3400  146.9000       9.8        87       912        97
VIS    2025250    200200   23.3500  146.8800       9.9        86       911        98
VIS    2025250    200200   23.3500  146.8600       9.7        87       913        98
VIS    2025250    200200   23.3500  146.3700      12.0        89       931        95
VIS    2025250    200200   23.3500  146.3500      11.8        89       917        92
VIS    2025250    200200   23.3500  146.2900      10.4        88       917        97
VIS    2025250    200200   23.3500  146.2800      10.1        89       917        96
VIS    2025250    200200   23.3300  146.2300      10.0        89       982       100
VIS    2025250    200200   23.3300  146.2000      10.8        88       973        99
VIS    2025250    200200   23.3300  146.1900      11.0        87       972        99
VIS    2025250    200200   23.3300  146.1600      11.1        85       973        99
VIS    2025250    200200   23.3200  145.8200      11.6        90       966        96
VIS    2025250    200200   23.3200  145.7300      11.1        96       980        97
VIS    2025250    200200   23.3200  145.7100      10.6        95       966        99
VIS    2025250    200200   23.3400  145.6800      10.4        93       980        98
VIS    2025250    200200   23.3400  145.4500      10.9        90       962        97
VIS    2025250    200200   23.3400  145.4400      10.8        89       962        97
VIS    2025250    200200   23.3200  145.4100      10.5        87       960        95
VIS    2025250    200200   23.3400  145.3800      10.9        86       949        96
VIS    2025250    200200   23.3300  145.3600      11.1        84       965        97
VIS    2025250    200200   23.3300  145.3400      11.4        87       966        99
VIS    2025250    200200   23.3300  145.3100      11.2        91       980        99
VIS    2025250    200200   23.3200  144.4500      11.7        93       987        98
VIS    2025250    200200   23.3200  143.1400       9.9        95       987       100
VIS    2025250    200200   23.3100  143.0800       9.7        94       968        98
VIS    2025250    200200   23.3200  143.0700      10.0        94       967        99
VIS    2025250    200200   23.3200  143.0400      10.4        97       952        94
VIS    2025250    200200   23.3200  143.0200      10.5       101       952        92
VIS    2025250    200200   23.3000  142.9700      10.1        99       982        99
VIS    2025250    200200   23.3100  142.9600       9.4       100       982        94
VIS    2025250    200200   23.3100  142.9300       9.9        97       988        94
VIS    2025250    200200   23.3900  152.1400       5.9       105       979        92
VIS    2025250    200200   23.4000  152.1400       5.8       104       988        90
VIS    2025250    200200   23.3900  152.0900       6.5        99       998        98
VIS    2025250    200200   23.3900  152.0600       6.3        97       992        97
VIS    2025250    200200   23.3900  151.9200       7.3        89       924        92
VIS    2025250    200200   23.4000  151.9000       7.0        85       900        96
VIS    2025250    200200   23.3900  151.8700       6.1        85       888        94
VIS    2025250    200200   23.3800  150.0500       9.3       111       909        94
VIS    2025250    200200   23.3700  150.0500       9.2       110       903        95
VIS    2025250    200200   23.3700  149.9600       8.2       108       888        97
VIS    2025250    200200   23.3500  149.8200       7.8       100       880        94
VIS    2025250    200200   23.3500  149.8100       7.7        99       880        92
VIS    2025250    200200   23.3600  149.7800       6.7       102       881        91
VIS    2025250    200200   23.3500  149.7500       6.9        95       906        91
VIS    2025250    200200   23.3500  149.7100       7.0       103       890        95
VIS    2025250    200200   23.3500  149.7000       7.4       107       864        98
VIS    2025250    200200   23.3300  148.4400       9.2       101       993        94
VIS    2025250    200200   23.3300  148.4100       8.7        97       992        92
VIS    2025250    200200   23.3300  148.3700       9.4        95       992        94
VIS    2025250    200200   23.3300  148.3600       9.5        95       992        94
VIS    2025250    200200   23.3300  148.1500       9.1        85      1000        96
VIS    2025250    200200   23.3400  148.1100      10.4        91       986        98
VIS    2025250    200200   23.3400  148.1100      10.5        93       986        97
VIS    2025250    200200   23.3400  148.0600       9.5       103       914        98
VIS    2025250    200200   23.3400  148.0600       9.4       103       914        98
VIS    2025250    200200   23.3300  148.0200       8.1        87       887        93
VIS    2025250    200200   23.3400  148.0000       8.8        82       894        92
VIS    2025250    200200   23.3200  147.9600       9.1        87       885        97
VIS    2025250    200200   23.3300  147.9400       9.0        92       884        98
VIS    2025250    200200   23.3300  147.9300       9.1        93       884        98
VIS    2025250    200200   23.3400  147.8900       9.3        88       884        97
VIS    2025250    200200   23.3300  147.8700       9.5        86       883        97
VIS    2025250    200200   23.3300  147.8400       9.4        89       884        98
VIS    2025250    200200   23.3300  147.8200       9.2        92       886        99
VIS    2025250    200200   23.3300  147.8000       8.7        89       886        98
VIS    2025250    200200   23.3400  147.7600       8.5        88       887        98
VIS    2025250    200200   23.3400  147.7300       9.0        90       890        97
VIS    2025250    200200   23.3200  147.7200       9.0        92       888        97
VIS    2025250    200200   23.3400  147.7000       9.3        94       888        97
VIS    2025250    200200   23.3400  147.6600       8.5        93       888        94
VIS    2025250    200200   23.3300  147.6300       8.0        87       889        96
VIS    2025250    200200   23.3400  147.6000       9.0        82       890        94
VIS    2025250    200200   23.3400  147.5900       9.3        83       890        94
VIS    2025250    200200   23.3200  147.5700       9.4        89       891        96
VIS    2025250    200200   23.3400  147.5300       9.8        87       895        94
VIS    2025250    200200   23.3300  147.5100       9.4        87       898        96
VIS    2025250    200200   23.3300  147.4700       9.3        89       900        97
VIS    2025250    200200   23.3200  147.4500       9.4        89       899        97
VIS    2025250    200200   23.3300  147.4400       9.5        88       899        97
VIS    2025250    200200   23.3400  147.4000       9.7        85       898        95
VIS    2025250    200200   23.3400  147.3900       9.8        86       899        95
VIS    2025250    200200   23.3300  147.3700       9.8        87       899        96
VIS    2025250    200200   23.3300  147.3400       9.5        90       899        97
VIS    2025250    200200   23.3200  147.3100       8.9        89       899        97
VIS    2025250    200200   23.3200  147.2700       9.1        87       900        96
VIS    2025250    200200   23.3100  147.2600       9.0        88       902        97
VIS    2025250    200200   23.3200  147.2300       8.6        89       905        96
VIS    2025250    200200   23.3300  147.2100       8.4        87       905        97
VIS    2025250    200200   23.3100  147.1700       8.1        83       908        95
VIS    2025250    200200   23.3100  147.1500       8.3        85       909        95
VIS    2025250    200200   23.3100  147.1300       8.8        88       912        97
VIS    2025250    200200   23.3300  147.1100       9.3        91       910        98
VIS    2025250    200200   23.3300  147.0900       9.3        88       912        98
VIS    2025250    200200   23.3200  147.0500       9.2        86       914        98
VIS    2025250    200200   23.3300  147.0100       9.6        87       912        98
VIS    2025250    200200   23.3300  147.0100       9.7        87       914        98
VIS    2025250    200200   23.3300  146.9700       9.2        87       917        93
VIS    2025250    200200   23.3300  146.9500       9.1        90       912        96
VIS    2025250    200200   23.3300  146.9300       9.4        90       912        97
VIS    2025250    200200   23.3300  146.8900       9.6        86       913        97
VIS    2025250    200200   23.3300  146.8700       9.5        86       913        97
VIS    2025250    200200   23.3100  146.3700      11.3        84       969        93
VIS    2025250    200200   23.3200  146.3000      10.7        89       948        92
VIS    2025250    200200   23.3100  146.2700      10.2        90       989       100
VIS    2025250    200200   23.3000  146.2600      10.3        90       989       100
VIS    2025250    200200   23.3100  146.2200      10.3        90       968       100
VIS    2025250    200200   23.3100  146.2100      10.4        90       968       100
VIS    2025250    200200   23.3000  146.1800      10.6        88       927       100
VIS    2025250    200200   23.3200  146.1600      10.8        85       973        99
VIS    2025250    200200   23.3200  145.9000      11.7        92       997        91
VIS    2025250    200200   23.3000  145.8800      11.3        89       984        97
VIS    2025250    200200   23.3000  145.8600      11.1        88       984        99
VIS    2025250    200200   23.3100  145.8300      11.4        89       962        98
VIS    2025250    200200   23.3200  145.8200      11.5        89       966        97
VIS    2025250    200200   23.3000  145.7900      11.9        91       964        97
VIS    2025250    200200   23.3000  145.7500      11.6        93       960        99
VIS    2025250    200200   23.3000  145.7200      11.1        94       924        99
VIS    2025250    200200   23.3000  145.6900      10.6        96       942        96
VIS    2025250    200200   23.3000  145.6900      10.5        95       942        95
VIS    2025250    200200   23.3100  145.4300      10.6        88       974        96
VIS    2025250    200200   23.3100  145.4000      10.4        86       967        98
VIS    2025250    200200   23.2900  145.3800      10.7        88       971        99
VIS    2025250    200200   23.3100  145.3000      11.1        90       975        98
VIS    2025250    200200   23.2800  144.3500       9.9        90       971        95
VIS    2025250    200200   23.2900  143.2800      10.5        94       992        93
VIS    2025250    200200   23.2700  143.2500      11.3        99       992        98
VIS    2025250    200200   23.2700  143.2300      10.8        95       970        98
VIS    2025250    200200   23.2700  143.2200      10.8        94       970        98
VIS    2025250    200200   23.2900  143.0500      10.6        98       969        97
VIS    2025250    200200   23.2800  143.0300      10.4        98       991        99
VIS    2025250    200200   23.2700  143.0200      10.3        98       971       100
VIS    2025250    200200   23.2700  142.9700      10.4        99       971        98
VIS    2025250    200200   23.2700  142.9600      10.1        99       977        98
VIS    2025250    200200   23.2900  142.9300       9.9        98       988        97
VIS    2025250    200200   23.2800  142.8400       9.2        96       984        93
VIS    2025250    200200   23.2700  142.5200       9.9       101       994        98
VIS    2025250    200200   23.2700  142.5100      10.1       100       990        95
VIS    2025250    200200   23.2700  142.4900      10.0       101       990        93
VIS    2025250    200200   23.3800  152.1500       6.1       105       979        91
VIS    2025250    200200   23.3900  152.1400       5.8       104       979        90
VIS    2025250    200200   23.3800  152.0700       6.3        97       992        98
VIS    2025250    200200   23.3800  152.0500       6.1        96       977        95
VIS    2025250    200200   23.3800  151.9200       7.3        92       924        94
VIS    2025250    200200   23.3800  151.9000       7.0        91       924        97
VIS    2025250    200200   23.3800  151.8700       6.3        87       900        95
VIS    2025250    200200   23.3400  150.0400      10.1       112       898        93
VIS    2025250    200200   23.3300  150.0200       9.5       108       892        93
VIS    2025250    200200   23.3300  150.0000       9.3       108       892        92
VIS    2025250    200200   23.3500  149.9500       7.3       110       863        93
VIS    2025250    200200   23.3500  149.8600       6.7       101       865        90
VIS    2025250    200200   23.3400  149.8200       7.5        96       878        91
VIS    2025250    200200   23.3500  149.8000       7.7        99       882        92
VIS    2025250    200200   23.3500  149.7800       7.4       100       900        93
VIS    2025250    200200   23.3300  149.7300       7.1        99       909        95
VIS    2025250    200200   23.3400  149.7200       6.9        99       908        94
VIS    2025250    200200   23.3200  149.6900       7.5       107       876        98
VIS    2025250    200200   23.3300  148.4400       8.5       104       973        93
VIS    2025250    200200   23.3000  148.4100       8.8       106       966        97
VIS    2025250    200200   23.3100  148.4000       8.3       104       973        96
VIS    2025250    200200   23.3000  148.3800      10.0       107       968        92
VIS    2025250    200200   23.3000  148.3400       9.7       109       947        92
VIS    2025250    200200   23.3000  148.3100       8.9       104       934        91
VIS    2025250    200200   23.3100  148.3100       8.9       104       943        90
VIS    2025250    200200   23.3100  148.2600       9.4       104       943        98
VIS    2025250    200200   23.3100  148.2500       9.7       105       948        98
VIS    2025250    200200   23.3100  148.2200       9.4       102       965        99
VIS    2025250    200200   23.3000  148.1900       9.4        97       965       100
VIS    2025250    200200   23.3200  148.1600       8.9        88      1000        98
VIS    2025250    200200   23.3200  148.1300       9.5        85       996        97
VIS    2025250    200200   23.3000  148.1100       9.6        86       986        97
VIS    2025250    200200   23.3100  148.0900      10.1        96       952        99
VIS    2025250    200200   23.3000  148.0500       9.0       101       904        99
VIS    2025250    200200   23.3000  148.0300       8.2        97       892        96
VIS    2025250    200200   23.3000  148.0000       8.8        88       886        94
VIS    2025250    200200   23.3000  147.9800       9.6        86       885        96
VIS    2025250    200200   23.3200  147.9600       9.2        87       885        97
VIS    2025250    200200   23.3000  147.9300       9.0        89       883        98
VIS    2025250    200200   23.3100  147.9200       9.4        92       884        98
VIS    2025250    200200   23.3000  147.8800       9.6        86       884        96
VIS    2025250    200200   23.3200  147.8700       9.7        85       883        96
VIS    2025250    200200   23.3100  147.8400       9.9        86       884        96
VIS    2025250    200200   23.3000  147.8100       9.4        84       888        94
VIS    2025250    200200   23.3000  147.7800       9.1        81       888        94
VIS    2025250    200200   23.2900  147.7600       8.9        85       890        96
VIS    2025250    200200   23.3200  147.7200       9.0        91       890        97
VIS    2025250    200200   23.3100  147.7200       9.0        91       889        97
VIS    2025250    200200   23.3100  147.6900       9.0        95       888        98
VIS    2025250    200200   23.3000  147.6500       7.9        94       890        97
VIS    2025250    200200   23.3000  147.6200       8.3        87       890        94
VIS    2025250    200200   23.3000  147.6100       8.5        86       890        95
VIS    2025250    200200   23.3000  147.5700       9.0        92       891        97
VIS    2025250    200200   23.3000  147.5400       8.3        93       891        98
VIS    2025250    200200   23.2900  147.5200       8.4        91       892        98
VIS    2025250    200200   23.2900  147.5100       8.8        88       893        97
VIS    2025250    200200   23.2900  147.4700       9.0        88       899        97
VIS    2025250    200200   23.3100  147.4500       9.3        90       899        96
VIS    2025250    200200   23.3000  147.4200       9.4        88       898        95
VIS    2025250    200200   23.3100  147.4000       9.6        86       898        96
VIS    2025250    200200   23.2900  147.3700       9.8        84       899        94
VIS    2025250    200200   23.2900  147.3500       9.8        84       899        94
VIS    2025250    200200   23.3000  147.3200       8.9        89       899        97
VIS    2025250    200200   23.2900  147.3000       8.8        88       900        97
VIS    2025250    200200   23.3000  147.2800       8.6        89       901        97
VIS    2025250    200200   23.3000  147.2500       8.7        90       904        98
VIS    2025250    200200   23.2900  147.2200       8.6        90       906        98
VIS    2025250    200200   23.2900  147.1800       8.2        87       909        97
VIS    2025250    200200   23.2900  147.1700       8.2        86       911        96
VIS    2025250    200200   23.3100  147.1500       8.3        84       910        95
VIS    2025250    200200   23.2900  147.1100       9.5        87       934        99
VIS    2025250    200200   23.2900  147.1000       9.7        87       924        99
VIS    2025250    200200   23.2900  147.0600       9.4        86       920        97
VIS    2025250    200200   23.2900  147.0500       9.3        87       920        97
VIS    2025250    200200   23.3100  146.9800       9.9        87       936        94
VIS    2025250    200200   23.2800  146.9700       9.4        85       943        97
VIS    2025250    200200   23.2900  146.9500       8.9        87       947        97
VIS    2025250    200200   23.2800  146.9000       8.0        88       962        97
VIS    2025250    200200   23.2900  146.8900       8.1        87       951        96
VIS    2025250    200200   23.3000  146.4400      11.4        87       982        99
VIS    2025250    200200   23.2800  146.4200      11.1        87       982        98
VIS    2025250    200200   23.2900  146.3900      11.0        86       986        99
VIS    2025250    200200   23.2900  146.3700      10.5        89       986        98
VIS    2025250    200200   23.2900  146.3300      11.0        94       989        97
VIS    2025250    200200   23.2800  146.3000      11.4       100       965        95
VIS    2025250    200200   23.2800  146.2800      10.9        93       980        99
VIS    2025250    200200   23.3000  146.2700      10.6        91       989       100
VIS    2025250    200200   23.2800  146.2300      10.2        90       944       100
VIS    2025250    200200   23.2900  146.2200      10.1        90       962       100
VIS    2025250    200200   23.2800  146.1700      10.3        89       927       100
VIS    2025250    200200   23.2800  146.1600      10.4        89       957       100
VIS    2025250    200200   23.2900  145.9300      12.1        88      1000        92
VIS    2025250    200200   23.2800  145.9300      12.2        89       988        94
VIS    2025250    200200   23.2700  145.8800      11.8        90       956        98
VIS    2025250    200200   23.2900  145.8700      11.3        88       984        99
VIS    2025250    200200   23.2800  145.8500      11.2        88       929        99
VIS    2025250    200200   23.2900  145.8000      11.7        89       948        97
VIS    2025250    200200   23.2700  145.7800      11.4        91       960        98
VIS    2025250    200200   23.2900  145.7600      11.4        91       960        98
VIS    2025250    200200   23.2700  145.7400      11.0        90       924        99
VIS    2025250    200200   23.2700  145.4000      10.7        93       978        99
VIS    2025250    200200   23.2800  145.3800      10.8        88       976       100
VIS    2025250    200200   23.2500  143.2600      11.1        94       982       100
VIS    2025250    200200   23.2500  143.2300      10.9        94       957       100
VIS    2025250    200200   23.2700  143.2300      10.9        96       970        99
VIS    2025250    200200   23.2500  143.2000      10.5        92       937        97
VIS    2025250    200200   23.2600  143.0500      10.3        96       991        98
VIS    2025250    200200   23.2700  143.0300      10.2        97       977       100
VIS    2025250    200200   23.2500  143.0000      10.3        98       961        96
VIS    2025250    200200   23.2600  142.9900      10.4        98       966        99
VIS    2025250    200200   23.2700  142.9700      10.4        98       971        97
VIS    2025250    200200   23.2700  142.9300       9.8        97       984        97
VIS    2025250    200200   23.2500  142.8200       9.7        94       987        96
VIS    2025250    200200   23.2600  142.8000       9.4        96       990        99
VIS    2025250    200200   23.2500  142.5500       9.7       102       981        97
VIS    2025250    200200   23.2500  142.5400       9.7       103       981        97
VIS    2025250    200200   23.2600  142.5000      10.3       104       990        96
VIS    2025250    200200   23.2600  142.4900      10.2       105       990        95
VIS    2025250    200200   23.3500  151.9100       7.0        98       963        96
VIS    2025250    200200   23.3500  151.9000       6.8        95       955        98
VIS    2025250    200200   23.3500  151.8800       6.5        92       955        98
VIS    2025250    200200   23.3000  150.0500       9.1       109       920        92
VIS    2025250    200200   23.3200  150.0200       9.5       108       893        95
VIS    2025250    200200   23.3100  150.0000       8.7       106       877        98
VIS    2025250    200200   23.3100  149.9700       7.9       108       874        93
VIS    2025250    200200   23.3000  149.7600       6.4       106       912        93
VIS    2025250    200200   23.3100  149.7300       7.1       107       912        96
VIS    2025250    200200   23.3100  149.7200       7.3       108       890        97
VIS    2025250    200200   23.3200  149.6900       7.7       109       876        98
VIS    2025250    200200   23.3000  149.6500       7.9       115       834        96
VIS    2025250    200200   23.2800  148.4700       9.2        89       995        96
VIS    2025250    200200   23.2900  148.4500       9.0       102       971        99
VIS    2025250    200200   23.2800  148.4300       8.8       104       958        97
VIS    2025250    200200   23.2900  148.4200       9.0       106       965        98
VIS    2025250    200200   23.2900  148.3900       9.8       106       965        94
VIS    2025250    200200   23.2900  148.3200       9.4       103       917        99
VIS    2025250    200200   23.3000  148.3100       9.1       104       934        94
VIS    2025250    200200   23.3000  148.2900       8.7       101       917        97
VIS    2025250    200200   23.2800  148.2500       9.6       103       907        98
VIS    2025250    200200   23.2800  148.2300       9.7       101       907        99
VIS    2025250    200200   23.2900  148.2000       9.5        97       942       100
VIS    2025250    200200   23.3000  148.1800       9.4        94       965        99
VIS    2025250    200200   23.2700  148.1600       9.4        87       965        96
VIS    2025250    200200   23.2800  148.1100       9.1        80       965        95
VIS    2025250    200200   23.2800  148.1000       9.0        82       953        96
VIS    2025250    200200   23.2800  148.0700       9.3        92       910        99
VIS    2025250    200200   23.2800  148.0500       9.2        92       893        98
VIS    2025250    200200   23.2800  148.0300       8.9        93       887        97
VIS    2025250    200200   23.2900  148.0000       9.1        87       886        95
VIS    2025250    200200   23.2900  147.9800       9.4        84       885        94
VIS    2025250    200200   23.2900  147.9600       9.3        80       883        94
VIS    2025250    200200   23.2800  147.9200       8.9        83       884        96
VIS    2025250    200200   23.2700  147.8900       9.6        83       893        96
VIS    2025250    200200   23.2800  147.8700      10.0        84       893        96
VIS    2025250    200200   23.2900  147.8500      10.1        85       888        94
VIS    2025250    200200   23.2900  147.8100       9.4        83       891        93
VIS    2025250    200200   23.2900  147.7800       9.1        81       891        95
VIS    2025250    200200   23.2800  147.7800       9.2        82       890        95
VIS    2025250    200200   23.2900  147.7500       8.8        87       890        96
VIS    2025250    200200   23.2700  147.7000       9.0        85       889        95
VIS    2025250    200200   23.2700  147.6800       8.6        90       889        97
VIS    2025250    200200   23.2800  147.6600       8.2        95       890        98
VIS    2025250    200200   23.2700  147.6300       8.1        90       895        95
VIS    2025250    200200   23.2900  147.6100       8.6        87       890        93
VIS    2025250    200200   23.2800  147.5900       9.1        86       891        92
VIS    2025250    200200   23.2700  147.5500       8.4        89       891        96
VIS    2025250    200200   23.2800  147.5300       8.1        94       892        98
VIS    2025250    200200   23.2700  147.5100       8.4        90       894        97
VIS    2025250    200200   23.2800  147.4900       8.8        87       899        96
VIS    2025250    200200   23.2700  147.4600       8.5        85       899        96
VIS    2025250    200200   23.2700  147.4400       8.9        88       899        96
VIS    2025250    200200   23.2600  147.4100       9.6        89       899        97
VIS    2025250    200200   23.2800  147.3800       9.7        84       900        95
VIS    2025250    200200   23.2700  147.3500       9.8        84       900        94
VIS    2025250    200200   23.2800  147.3400       9.8        84       900        95
VIS    2025250    200200   23.2800  147.2900       8.9        88       901        97
VIS    2025250    200200   23.2600  147.2700       8.8        89       903        98
VIS    2025250    200200   23.2800  147.2600       8.6        89       903        98
VIS    2025250    200200   23.2800  147.2200       8.6        89       907        98
VIS    2025250    200200   23.2700  147.2100       8.7        88       908        97
VIS    2025250    200200   23.2700  147.1800       8.8        88       916        97
VIS    2025250    200200   23.2800  147.1600       8.4        87       917        95
VIS    2025250    200200   23.2800  147.1000      10.0        86       940        98
VIS    2025250    200200   23.2800  147.0900      10.0        86       940        98
VIS    2025250    200200   23.2800  147.0400       9.3        87       921        96
VIS    2025250    200200   23.2800  147.0200       9.5        89       923        93
VIS    2025250    200200   23.2800  146.9800       9.6        86       943        96
VIS    2025250    200200   23.2700  146.9400       8.8        86       962        99
VIS    2025250    200200   23.2700  146.9300       8.6        87       962        98
VIS    2025250    200200   23.2800  146.9100       8.0        89       962        97
VIS    2025250    200200   23.2600  146.7800      10.3        84       994        90
VIS    2025250    200200   23.2700  146.4700      10.8        83       982        99
VIS    2025250    200200   23.2600  146.4500       9.9        89       982        99
VIS    2025250    200200   23.2700  146.4300      10.8        88       971        98
VIS    2025250    200200   23.2700  146.4100      10.8        88       973        99
VIS    2025250    200200   23.2700  146.3900      10.8        89       978        99
VIS    2025250    200200   23.2500  146.3500      11.1        98       976        98
VIS    2025250    200200   23.2500  146.3100      11.7        98       963        96
VIS    2025250    200200   23.2600  146.3000      11.4        99       961        96
VIS    2025250    200200   23.2600  146.2600      10.6        92       923       100
VIS    2025250    200200   23.2500  146.2600      10.6        91       923        99
VIS    2025250    200200   23.2500  146.2300      10.6        88       916        99
VIS    2025250    200200   23.2600  146.2000      10.2        89       922       100
VIS    2025250    200200   23.2500  146.1800      10.8        89       926        98
VIS    2025250    200200   23.2600  145.9200      12.2        93       986        96
VIS    2025250    200200   23.2600  145.9100      12.3        92       984        96
VIS    2025250    200200   23.2500  145.8700      12.1        91       926        99
VIS    2025250    200200   23.2500  145.8600      11.9        91       925        98
VIS    2025250    200200   23.2500  145.8300      11.6        95       925        99
VIS    2025250    200200   23.2700  145.8100      11.5        91       944        98
VIS    2025250    200200   23.2700  145.7700      11.2        91       960        99
VIS    2025250    200200   23.2700  145.7600      11.0        89       960        99
VIS    2025250    200200   23.2600  145.7300      10.7        88       922        99
VIS    2025250    200200   23.2700  145.7100      10.9        91       922        96
VIS    2025250    200200   23.2400  143.2600      11.0        94       982        99
VIS    2025250    200200   23.2300  143.2400      10.8        93       957       100
VIS    2025250    200200   23.2400  143.0100      10.1        96       961        96
VIS    2025250    200200   23.2400  142.9800      10.5        97       971        93
VIS    2025250    200200   23.2300  142.9700      10.5        97       973        94
VIS    2025250    200200   23.2200  142.5900      10.3       103       972        97
VIS    2025250    200200   23.2200  142.5900      10.2       101       972        98
VIS    2025250    200200   23.2200  142.5400       9.6       101       976        98
VIS    2025250    200200   23.2400  142.5200      10.1       105       976        97
VIS    2025250    200200   23.2200  142.4900      10.6       108       971        94
VIS    2025250    200200   23.2300  142.4900      10.5       108       971        94
VIS    2025250    200200   23.3200  151.9900       6.8       101       982        90
VIS    2025250    200200   23.3300  151.9500       6.5        97       987        91
VIS    2025250    200200   23.3100  151.9300       6.7        99       978        99
VIS    2025250    200200   23.3200  151.9100       6.5        95       963        98
VIS    2025250    200200   23.3100  151.8700       6.5        92       955        95
VIS    2025250    200200   23.3000  151.2900       5.9       103       951        97
VIS    2025250    200200   23.3000  151.2800       5.8       105       951        94
VIS    2025250    200200   23.3000  150.0500       9.0       108       920        92
VIS    2025250    200200   23.2800  150.0300       8.5        99       890        98
VIS    2025250    200200   23.2800  150.0200       8.5        96       890        97
VIS    2025250    200200   23.3000  150.0000       8.3       103       877        99
VIS    2025250    200200   23.2900  149.7500       6.6       107       890        95
VIS    2025250    200200   23.2900  149.7300       7.6       109       875        99
VIS    2025250    200200   23.2900  149.6900       7.7       115       876        97
VIS    2025250    200200   23.2700  149.6800       8.0       118       877        98
VIS    2025250    200200   23.2800  149.6400       8.0       115       834        95
VIS    2025250    200200   23.2600  148.5000       9.4        87       995        94
VIS    2025250    200200   23.2500  148.4800       9.7        92       995        98
VIS    2025250    200200   23.2600  148.4500       9.5        99       958        98
VIS    2025250    200200   23.2700  148.4300       8.9       104       902        94
VIS    2025250    200200   23.2600  148.3500       8.7       105       874        91
VIS    2025250    200200   23.2600  148.3200       8.7       101       880        98
VIS    2025250    200200   23.2500  148.3000       9.3        98       880        96
VIS    2025250    200200   23.2700  148.2900       9.1       100       866        93
VIS    2025250    200200   23.2700  148.2600       9.7       103       866        90
VIS    2025250    200200   23.2500  148.2300      10.0        98       832        93
VIS    2025250    200200   23.2700  148.2000       9.7        96       902       100
VIS    2025250    200200   23.2600  148.1900       9.7        96       898       100
VIS    2025250    200200   23.2500  148.1400       9.3        84       951        96
VIS    2025250    200200   23.2500  148.1400       9.2        83       951        96
VIS    2025250    200200   23.2500  148.1100       9.1        81       942        95
VIS    2025250    200200   23.2500  148.0700       9.2        88       893        98
VIS    2025250    200200   23.2600  148.0400       9.6        91       889        97
VIS    2025250    200200   23.2600  148.0300       9.7        92       886        96
VIS    2025250    200200   23.2500  148.0100       9.5        89       886        96
VIS    2025250    200200   23.2600  147.9600       9.1        76       883        90
VIS    2025250    200200   23.2600  147.9200       8.5        74       884        90
VIS    2025250    200200   23.2600  147.9000       9.2        82       894        96
VIS    2025250    200200   23.2400  147.8800       9.5        86       894        96
VIS    2025250    200200   23.2500  147.8400      10.1        82       895        93
VIS    2025250    200200   23.2400  147.8300      10.0        80       894        94
VIS    2025250    200200   23.2500  147.7800       9.1        81       887        95
VIS    2025250    200200   23.2500  147.7800       9.0        81       887        95
VIS    2025250    200200   23.2400  147.7500       8.4        79       892        95
VIS    2025250    200200   23.2600  147.7100       9.1        83       889        95
VIS    2025250    200200   23.2500  147.7000       9.4        81       889        94
VIS    2025250    200200   23.2600  147.6800       8.8        87       889        96
VIS    2025250    200200   23.2600  147.6500       8.1        91       892        97
VIS    2025250    200200   23.2600  147.6300       8.1        90       896        95
VIS    2025250    200200   23.2600  147.5800       8.9        87       891        93
VIS    2025250    200200   23.2600  147.5700       8.8        87       891        94
VIS    2025250    200200   23.2500  147.5300       8.1        91       895        98
VIS    2025250    200200   23.2500  147.5000       8.5        88       897        97
VIS    2025250    200200   23.2600  147.4900       8.5        86       899        96
VIS    2025250    200200   23.2500  147.4600       8.4        84       904        96
VIS    2025250    200200   23.2400  147.4400       8.7        85       904        97
VIS    2025250    200200   23.2600  147.4000       9.5        88       901        97
VIS    2025250    200200   23.2600  147.3900       9.4        87       901        96
VIS    2025250    200200   23.2600  147.3500       9.6        84       901        95
VIS    2025250    200200   23.2500  147.3200       9.6        85       906        96
VIS    2025250    200200   23.2400  147.3200       9.5        85       907        96
VIS    2025250    200200   23.2400  147.2900       9.5        86       908        98
VIS    2025250    200200   23.2400  147.2600       9.3        89       910        99
VIS    2025250    200200   23.2400  147.2400       9.1        88       916        98
VIS    2025250    200200   23.2500  147.2100       9.0        87       917        96
VIS    2025250    200200   23.2600  147.1900       9.1        88       917        98
VIS    2025250    200200   23.2400  147.1600       9.2        89       933        98
VIS    2025250    200200   23.2500  147.0700       9.2        86       951        94
VIS    2025250    200200   23.2500  147.0600       9.2        87       944        95
VIS    2025250    200200   23.2400  146.9700       9.3        83       962        98
VIS    2025250    200200   23.2500  146.9400       9.2        84       956        98
VIS    2025250    200200   23.2500  146.9100       9.1        86       946        98
VIS    2025250    200200   23.2500  146.9000       8.8        88       929        98
VIS    2025250    200200   23.2400  146.8300       9.2        86       989        97
VIS    2025250    200200   23.2400  146.7700      10.4        86       987        99
VIS    2025250    200200   23.2400  146.7100      10.9        80       988        95
VIS    2025250    200200   23.2300  146.6800      10.5        82       992        99
VIS    2025250    200200   23.2300  146.6700      10.7        84       992        99
VIS    2025250    200200   23.2300  146.6500      10.8        85       992       100
VIS    2025250    200200   23.2300  146.6300      10.9        85       994        98
VIS    2025250    200200   23.2300  146.4700      10.5        92       970        99
VIS    2025250    200200   23.2300  146.4400      10.0        92       968        99
VIS    2025250    200200   23.2300  146.4400      10.0        92       968        99
VIS    2025250    200200   23.2300  146.4100       9.7        93       963        98
VIS    2025250    200200   23.2400  146.3800      10.1        93       968        99
VIS    2025250    200200   23.2400  146.3600      10.2        95       964        98
VIS    2025250    200200   23.2300  146.3200      10.7        94       937        99
VIS    2025250    200200   23.2200  146.2900      10.4        95       923        99
VIS    2025250    200200   23.2300  146.2900      10.3        95       923        99
VIS    2025250    200200   23.2300  146.2500      10.5        89       919       100
VIS    2025250    200200   23.2300  146.2300      10.4        88       916        99
VIS    2025250    200200   23.2300  146.1900      11.1        90       925        95
VIS    2025250    200200   23.2400  146.1900      10.9        89       925        97
VIS    2025250    200200   23.2400  145.9100      12.0        93       973        99
VIS    2025250    200200   23.2300  145.9000      11.7        94       948        99
VIS    2025250    200200   23.2400  145.8800      12.0        91       926        99
VIS    2025250    200200   23.2300  145.8600      11.8        95       927        99
VIS    2025250    200200   23.2200  145.8100      11.2        98       939        98
VIS    2025250    200200   23.2200  145.8000      11.2        98       939        98
VIS    2025250    200200   23.2300  145.7600      10.7        89       929       100
VIS    2025250    200200   23.2200  145.7400      10.6        86       925        98
VIS    2025250    200200   23.2300  145.7100      10.7        89       925        93
VIS    2025250    200200   23.2400  145.7000      10.9        91       954        90
VIS    2025250    200200   23.2100  143.2800      10.2        93       982        98
VIS    2025250    200200   23.2200  143.2500      10.6        92       963       100
VIS    2025250    200200   23.1900  143.0500      10.2        92       995        99
VIS    2025250    200200   23.1900  143.0300      10.6        93       995       100
VIS    2025250    200200   23.2000  143.0000      10.6        94       995        98
VIS    2025250    200200   23.2000  142.9200      10.7        99       982        98
VIS    2025250    200200   23.1900  142.6500      10.9       107       999        93
VIS    2025250    200200   23.1900  142.6400      10.8       109       992        90
VIS    2025250    200200   23.1900  142.6100      11.0       106       971        95
VIS    2025250    200200   23.1900  142.5900      10.3       103       938        97
VIS    2025250    200200   23.2100  142.5600       9.6        99       953        98
VIS    2025250    200200   23.2000  142.5300      10.1       105       969        96
VIS    2025250    200200   23.2100  142.5000      10.4       107       969        95
VIS    2025250    200200   23.1900  142.4900       9.8       105       937        96
VIS    2025250    200200   23.2900  151.9400       6.9        96       978        94
VIS    2025250    200200   23.3000  151.9300       6.8        99       978        98
VIS    2025250    200200   23.2800  151.9000       6.6        99       942        99
VIS    2025250    200200   23.2700  151.3200       5.8        97       955        91
VIS    2025250    200200   23.2700  151.2900       5.6       101       915        99
VIS    2025250    200200   23.2700  151.2600       4.6        98       915        91
VIS    2025250    200200   23.2500  150.0600       8.0       102       941        91
VIS    2025250    200200   23.2700  150.0200       8.6        97       890        98
VIS    2025250    200200   23.2600  150.0000       8.4        94       886        97
VIS    2025250    200200   23.2500  149.9900       8.2        94       886        97
VIS    2025250    200200   23.2500  149.9500       6.6        87       871        90
VIS    2025250    200200   23.2500  149.8800       6.8        92       875        91
VIS    2025250    200200   23.2700  149.6700       8.0       118       844        98
VIS    2025250    200200   23.2600  149.6400       7.5       115       834        94
VIS    2025250    200200   23.2400  148.4900      10.0        96       995        99
VIS    2025250    200200   23.2300  148.4600       9.8        99       944        97
VIS    2025250    200200   23.2400  148.4500       9.3        99       944        95
VIS    2025250    200200   23.2300  148.4200       8.2       102       892        97
VIS    2025250    200200   23.2300  148.4100       7.9       103       892        99
VIS    2025250    200200   23.2300  148.3600       8.7       100       886        98
VIS    2025250    200200   23.2300  148.3500       9.1       103       886        97
VIS    2025250    200200   23.2300  148.3100       9.5       103       881        95
VIS    2025250    200200   23.2500  148.3000       9.5        99       880        96
VIS    2025250    200200   23.2400  148.2600       9.8       100       861        91
VIS    2025250    200200   23.2300  148.2500      10.0        97       828        93
VIS    2025250    200200   23.2200  148.2100       9.9        94       829        94
VIS    2025250    200200   23.2400  148.1900       9.8        98       887        99
VIS    2025250    200200   23.2400  148.1700       9.5        95       912        99
VIS    2025250    200200   23.2300  148.1400       9.4        91       942        98
VIS    2025250    200200   23.2400  148.1000       9.2        86       923        97
VIS    2025250    200200   23.2300  148.0900       9.3        90       908        99
VIS    2025250    200200   23.2200  148.0700       9.4        93       854        97
VIS    2025250    200200   23.2200  148.0400       9.4        93       829        92
VIS    2025250    200200   23.2300  148.0200       9.5        91       829        92
VIS    2025250    200200   23.2400  147.9800       8.9        82       831        91
VIS    2025250    200200   23.2200  147.9500       8.7        85       826        92
VIS    2025250    200200   23.2400  147.9000       8.8        80       884        95
VIS    2025250    200200   23.2400  147.8800       9.3        85       893        97
VIS    2025250    200200   23.2300  147.8700       9.6        89       865        95
VIS    2025250    200200   23.2300  147.8200      10.0        80       842        90
VIS    2025250    200200   23.2200  147.8000       8.9        76       847        91
VIS    2025250    200200   23.2300  147.7900       8.9        76       847        91
VIS    2025250    200200   23.2300  147.7500       8.2        77       892        95
VIS    2025250    200200   23.2200  147.7400       8.2        76       892        93
VIS    2025250    200200   23.2300  147.6900       9.7        83       896        96
VIS    2025250    200200   23.2200  147.6900       9.7        84       896        96
VIS    2025250    200200   23.2300  147.6600       8.6        86       896        93
VIS    2025250    200200   23.2400  147.6400       8.4        87       896        96
VIS    2025250    200200   23.2200  147.6100       8.7        90       896        98
VIS    2025250    200200   23.2300  147.5800       8.6        93       896        98
VIS    2025250    200200   23.2200  147.5400       8.5        91       895        98
VIS    2025250    200200   23.2200  147.5300       8.5        90       896        98
VIS    2025250    200200   23.2300  147.4900       8.7        87       903        97
VIS    2025250    200200   23.2200  147.4600       8.8        85       910        97
VIS    2025250    200200   23.2100  147.4600       8.8        85       910        97
VIS    2025250    200200   23.2100  147.4200       9.7        84       909        96
VIS    2025250    200200   23.2300  147.4000       9.8        85       907        98
VIS    2025250    200200   23.2100  147.3800      10.2        84       911        97
VIS    2025250    200200   23.2100  147.3400       9.5        87       913        99
VIS    2025250    200200   23.2200  147.3100       9.5        86       914        98
VIS    2025250    200200   23.2300  147.2800       9.6        87       910        99
VIS    2025250    200200   23.2300  147.2800       9.6        88       910        99
VIS    2025250    200200   23.2300  147.2500       9.4        90       916        99
VIS    2025250    200200   23.2300  147.2100       9.4        85       943        98
VIS    2025250    200200   23.2300  147.2000       9.6        84       943        99
VIS    2025250    200200   23.2300  146.9500      10.0        83       974        98
VIS    2025250    200200   23.2200  146.9400      10.1        83       974        99
VIS    2025250    200200   23.2100  146.8200      10.6        88       993        97
VIS    2025250    200200   23.2200  146.8000      10.7        88       993        96
VIS    2025250    200200   23.2000  146.7900      10.3        89       987        99
VIS    2025250    200200   23.2000  146.7500      10.9        84       975        99
VIS    2025250    200200   23.2000  146.7400      11.0        83       975        99
VIS    2025250    200200   23.2000  146.7200      11.0        82       976        99
VIS    2025250    200200   23.2200  146.6700      10.6        85       992        99
VIS    2025250    200200   23.2000  146.6500      10.7        88       975        99
VIS    2025250    200200   23.2000  146.6400      10.7        87       977        99
VIS    2025250    200200   23.2000  146.6000      10.3        91       998        95
VIS    2025250    200200   23.2100  146.5900      10.2        92       998        95
VIS    2025250    200200   23.2100  146.5400      10.5        93       986        99
VIS    2025250    200200   23.2100  146.5200      10.7        95       962        97
VIS    2025250    200200   23.2000  146.4900      10.6        97       963        98
VIS    2025250    200200   23.2000  146.4700      10.3        94       952        99
VIS    2025250    200200   23.2200  146.4500      10.1        92       963        99
VIS    2025250    200200   23.2100  146.4300       9.9        93       937        98
VIS    2025250    200200   23.2100  146.4100       9.5        94       941        98
VIS    2025250    200200   23.2100  146.3800       9.5        94       941        98
VIS    2025250    200200   23.2200  146.3400      10.1        91       936        99
VIS    2025250    200200   23.2100  146.3400      10.0        90       925        99
VIS    2025250    200200   23.2000  146.3100      10.2        92       920        99
VIS    2025250    200200   23.2100  146.2900      10.4        94       920        99
VIS    2025250    200200   23.2000  146.2500      10.5        92       919       100
VIS    2025250    200200   23.2000  146.2300      10.5        94       922        99
VIS    2025250    200200   23.1900  145.9200      12.1        95       961        98
VIS    2025250    200200   23.1900  145.9000      11.8        94       948        99
VIS    2025250    200200   23.2000  145.8900      11.6        95       941        99
VIS    2025250    200200   23.1900  145.8600      10.7        95       934        96
VIS    2025250    200200   23.2000  145.8300      10.7        96       927        98
VIS    2025250    200200   23.2100  145.7900      10.6        94       930        98
VIS    2025250    200200   23.2100  145.7800      10.7        93       929        99
VIS    2025250    200200   23.2100  145.7400      10.8        87       925        98
VIS    2025250    200200   23.2100  145.7400      10.7        86       925        98
VIS    2025250    200200   23.1900  145.7100      10.4        86       936        95
VIS    2025250    200200   23.2100  145.6700      10.8        89       997        93
VIS    2025250    200200   23.2000  145.6600      10.9        88       997        98
VIS    2025250    200200   23.1800  143.2700       9.9        93       973        95
VIS    2025250    200200   23.1900  143.2400      10.3        94       964        99
VIS    2025250    200200   23.1900  143.2200      10.4        94       957        99
VIS    2025250    200200   23.1900  143.0500      10.1        92       995        99
VIS    2025250    200200   23.1700  143.0100      10.8        94       990       100
VIS    2025250    200200   23.1700  142.7300      12.7       100      1000        94
VIS    2025250    200200   23.1700  142.6800      10.7        97       986        99
VIS    2025250    200200   23.1900  142.6500      10.5       104       999        95
VIS    2025250    200200   23.1800  142.6300      10.8       108       972        95
VIS    2025250    200200   23.1800  142.6200      11.0       107       971        95
VIS    2025250    200200   23.1600  142.5800      10.2       102       938        97
VIS    2025250    200200   23.1800  142.5600       9.7       101       942        98
VIS    2025250    200200   23.1700  142.5500       9.8       104       952        96
VIS    2025250    200200   23.1700  142.5100      10.3       105       966        96
VIS    2025250    200200   23.1800  142.5000      10.1       105       937        97
VIS    2025250    200200   23.2600  152.0900       7.7       102       988        95
VIS    2025250    200200   23.2600  152.0100       6.1        92       996        91
VIS    2025250    200200   23.2600  151.9900       6.6        93       986        96
VIS    2025250    200200   23.2700  151.9600       6.9        96       984        95
VIS    2025250    200200   23.2600  151.9300       6.8        99       950        99
VIS    2025250    200200   23.2600  151.9000       6.7        98       942        98
VIS    2025250    200200   23.2500  151.4200       7.8       108       930        91
VIS    2025250    200200   23.2500  151.3800       7.8       101       936        95
VIS    2025250    200200   23.2500  151.3300       6.1        81       902        96
VIS    2025250    200200   23.2600  151.3000       5.3        92       890        96
VIS    2025250    200200   23.2700  151.2900       5.3       100       890        97
VIS    2025250    200200   23.2500  151.2500       4.1        95       890        92
VIS    2025250    200200   23.2400  150.0600       7.7        96       977        95
VIS    2025250    200200   23.2300  150.0500       7.6        93       977        95
VIS    2025250    200200   23.2400  150.0200       8.2        96       929        97
VIS    2025250    200200   23.2400  149.9800       7.9        93       890        97
VIS    2025250    200200   23.2300  149.9700       7.7        94       881        97
VIS    2025250    200200   23.2400  149.8800       6.8        93       875        92
VIS    2025250    200200   23.2400  149.8400       6.9        91       877        90
VIS    2025250    200200   23.2300  149.8100       7.4        95       882        93
VIS    2025250    200200   23.2300  149.7700       6.9       106       908        98
VIS    2025250    200200   23.2300  149.7600       7.0       107       908        99
VIS    2025250    200200   23.2400  149.7200       6.9       112       821        94
VIS    2025250    200200   23.2000  148.5000       9.5       100       963        99
VIS    2025250    200200   23.2000  148.4600       9.7       105       898        96
VIS    2025250    200200   23.2100  148.4600       9.5       105       898        96
VIS    2025250    200200   23.2100  148.4300       8.1       102       892        98
VIS    2025250    200200   23.2000  148.4100       8.3       100       889       100
VIS    2025250    200200   23.2200  148.3700       9.0       100       886        98
VIS    2025250    200200   23.2100  148.3500       9.3       103       886        96
VIS    2025250    200200   23.2200  148.3000      10.0       104       882        94
VIS    2025250    200200   23.2100  148.2700       9.9        98       882        94
VIS    2025250    200200   23.2100  148.2400       9.9        93       833        94
VIS    2025250    200200   23.2200  148.2100       9.9        93       829        94
VIS    2025250    200200   23.2000  148.1900      10.5        99       829        94
VIS    2025250    200200   23.2000  148.1700      10.5       101       829        94
VIS    2025250    200200   23.2100  148.1500       9.9        98       918        97
VIS    2025250    200200   23.2100  148.1100       9.5        94       919        99
VIS    2025250    200200   23.2000  148.0800       9.3        95       908       100
VIS    2025250    200200   23.2200  148.0700       9.3        95       854        97
VIS    2025250    200200   23.2200  148.0500       9.2        95       836        95
VIS    2025250    200200   23.1900  148.0200       8.8        88       828        92
VIS    2025250    200200   23.1900  147.9900       8.7        84       826        92
VIS    2025250    200200   23.2100  147.9700       8.7        86       826        93
VIS    2025250    200200   23.2000  147.9400       9.0        88       826        93
VIS    2025250    200200   23.1900  147.9000       9.5        80       827        90
VIS    2025250    200200   23.1900  147.8200       9.0        80       838        91
VIS    2025250    200200   23.1900  147.8100       8.5        80       838        91
VIS    2025250    200200   23.2100  147.7700       7.5        74       847        90
VIS    2025250    200200   23.2100  147.7700       7.5        74       849        91
VIS    2025250    200200   23.2000  147.7300       8.5        75       898        93
VIS    2025250    200200   23.2100  147.7000       9.7        84       898        96
VIS    2025250    200200   23.2000  147.6900       9.8        87       898        97
VIS    2025250    200200   23.2100  147.6700       9.1        87       896        92
VIS    2025250    200200   23.2100  147.6300       8.8        88       896        96
VIS    2025250    200200   23.2000  147.6000       8.9        89       895        98
VIS    2025250    200200   23.1900  147.5700       8.9        91       895        99
VIS    2025250    200200   23.1900  147.5600       8.7        92       896        99
VIS    2025250    200200   23.1900  147.5300       8.7        91       896        99
VIS    2025250    200200   23.2000  147.5000       8.7        90       899        98
VIS    2025250    200200   23.2100  147.4000      10.2        83       926        97
VIS    2025250    200200   23.2100  147.3800      10.3        83       913        97
VIS    2025250    200200   23.2000  147.3400       9.8        88       917        99
VIS    2025250    200200   23.2100  147.3300       9.5        87       917        99
VIS    2025250    200200   23.1900  146.7900      10.2        89       993        99
VIS    2025250    200200   23.1900  146.7500      10.9        85       975        99
VIS    2025250    200200   23.1800  146.7400      11.2        83       975       100
VIS    2025250    200200   23.1900  146.7200      11.1        83       975        99
VIS    2025250    200200   23.1900  146.7000      10.7        86       976        99
VIS    2025250    200200   23.1800  146.6600      10.6        89       960       100
VIS    2025250    200200   23.1800  146.6300      10.5        88       958       100
VIS    2025250    200200   23.1800  146.6100      10.5        88       958        99
VIS    2025250    200200   23.1800  146.5800      10.3        92       958        99
VIS    2025250    200200   23.1800  146.5700      10.4        94       958        98
VIS    2025250    200200   23.1800  146.5400      10.7        96       930        97
VIS    2025250    200200   23.2000  146.5000      10.7        97       952        98
VIS    2025250    200200   23.2000  146.4900      10.6        97       927        99
VIS    2025250    200200   23.1800  146.4600      10.5        95       916        99
VIS    2025250    200200   23.1900  146.4400      10.5        93       919        99
VIS    2025250    200200   23.1800  146.4200      10.3        95       918        99
VIS    2025250    200200   23.1800  146.3700       9.3        94       915        98
VIS    2025250    200200   23.1800  146.3600       9.3        92       915        98
VIS    2025250    200200   23.1900  146.3400       9.8        89       919        98
VIS    2025250    200200   23.1900  146.3100      10.1        91       920        99
VIS    2025250    200200   23.1900  146.2700      10.5        93       919       100
VIS    2025250    200200   23.1800  146.2600      10.4        92       921       100
VIS    2025250    200200   23.1700  145.9400      12.0        94       988        99
VIS    2025250    200200   23.1900  145.9100      12.0        95       954        99
VIS    2025250    200200   23.1800  145.8900      11.4        96       944        99
VIS    2025250    200200   23.1900  145.8800      11.2        95       941        98
VIS    2025250    200200   23.1900  145.8600      10.6        95       934        96
VIS    2025250    200200   23.1700  145.8200       9.3        88       919        92
VIS    2025250    200200   23.1900  145.7900      10.0        89       919        95
VIS    2025250    200200   23.1800  145.7700      10.3        89       919        98
VIS    2025250    200200   23.1700  145.7500      10.6        88       919        99
VIS    2025250    200200   23.1900  145.7200      10.6        84       936        96
VIS    2025250    200200   23.1800  145.7100      10.3        84       944        96
VIS    2025250    200200   23.1800  145.6600      10.1        88       971        98
VIS    2025250    200200   23.1800  145.6500      10.4        86       977        99
VIS    2025250    200200   23.1600  143.0500       9.9        97       990        99
VIS    2025250    200200   23.1400  142.7400      11.6       107       994        91
VIS    2025250    200200   23.1500  142.7100      11.6       103       975        96
VIS    2025250    200200   23.1500  142.6900      11.3        99       972        98
VIS    2025250    200200   23.1400  142.6800      11.2        99       972        98
VIS    2025250    200200   23.1600  142.6400      10.6       104       979        96
VIS    2025250    200200   23.1400  142.6200      10.6       100       971        98
VIS    2025250    200200   23.1600  142.6000      10.7       103       942        97
VIS    2025250    200200   23.1500  142.5600      10.0       102       961        97
VIS    2025250    200200   23.1500  142.5600      10.0       102       961        96
VIS    2025250    200200   23.1500  142.5200      10.6       105       941        96
VIS    2025250    200200   23.1400  142.4900      10.1       100       926        98
VIS    2025250    200200   23.1400  142.4800      10.1       100       926        97
VIS    2025250    200200   23.2500  152.1000       8.1       100       988        92
VIS    2025250    200200   23.2300  152.0700       7.9        91       987        94
VIS    2025250    200200   23.2400  152.0600       7.5        94       987        93
VIS    2025250    200200   23.2500  152.0300       6.9       100       991        98
VIS    2025250    200200   23.2500  151.9900       6.7        95       986        98
VIS    2025250    200200   23.2300  151.9800       7.1        98       979        93
VIS    2025250    200200   23.2500  151.9400       7.0        98       976        98
VIS    2025250    200200   23.2500  151.9300       6.9        99       958        99
VIS    2025250    200200   23.2500  151.9000       6.7        97       942        99
VIS    2025250    200200   23.2500  151.8800       6.7        96       955        97
VIS    2025250    200200   23.2200  151.4500       7.6       110       899        94
VIS    2025250    200200   23.2200  151.4200       7.4       110       883        90
VIS    2025250    200200   23.2200  151.3800       6.5        98       885        94
VIS    2025250    200200   23.2300  151.3500       6.3        78       885        92
VIS    2025250    200200   23.2400  151.3300       6.2        77       890        95
VIS    2025250    200200   23.2400  151.2900       4.7        94       866        94
VIS    2025250    200200   23.2400  151.2800       4.4        91       866        92
VIS    2025250    200200   23.2100  150.0100       7.4       105       969        92
VIS    2025250    200200   23.2100  149.9900       7.5       103       937        97
VIS    2025250    200200   23.2100  149.9700       7.8        99       912       100
VIS    2025250    200200   23.2000  149.9500       7.4        94       884        94
VIS    2025250    200200   23.2100  149.8800       6.7        90       874        91
VIS    2025250    200200   23.2200  149.8400       7.7        87       872        94
VIS    2025250    200200   23.2000  149.8100       8.2        83       876        92
VIS    2025250    200200   23.2200  149.8000       7.5        94       889        97
VIS    2025250    200200   23.2000  149.7700       8.0       102       913        93
VIS    2025250    200200   23.2100  149.7300       6.9       102       906        94
VIS    2025250    200200   23.1900  149.7000       7.3       103       861        98
VIS    2025250    200200   23.2000  149.5600       6.4       103       875        95
VIS    2025250    200200   23.1800  148.5200       8.8        93       971        99
VIS    2025250    200200   23.1800  148.5200       8.8        94       963        99
VIS    2025250    200200   23.2000  148.4900       9.6       102       909        98
VIS    2025250    200200   23.2000  148.4700       9.8       106       898        96
VIS    2025250    200200   23.1700  148.4400       9.2       101       882        98
VIS    2025250    200200   23.1900  148.4100       8.3       100       889       100
VIS    2025250    200200   23.1700  148.3700       9.6       104       881        96
VIS    2025250    200200   23.1800  148.3600       9.7       105       880        96
VIS    2025250    200200   23.1900  148.2800      10.0       100       881        95
VIS    2025250    200200   23.1700  148.2400      10.0        95       837        95
VIS    2025250    200200   23.1900  148.2200      10.1        94       832        94
VIS    2025250    200200   23.1700  148.2000      10.5       100       834        95
VIS    2025250    200200   23.1800  148.1800      10.6       101       832        94
VIS    2025250    200200   23.1900  148.1400       9.7        96       918        99
VIS    2025250    200200   23.1700  148.1200       9.5        93       919       100
VIS    2025250    200200   23.1900  148.0900       9.2        94       915       100
VIS    2025250    200200   23.1700  148.0700       9.0        90       915        97
VIS    2025250    200200   23.1700  148.0600       9.1        90       874        94
VIS    2025250    200200   23.1900  148.0100       8.7        87       828        93
VIS    2025250    200200   23.1900  148.0000       8.7        86       826        93
VIS    2025250    200200   23.1700  147.9700       9.5        89       843        95
VIS    2025250    200200   23.1700  147.9500       9.3        94       843        97
VIS    2025250    200200   23.1700  147.9100       9.3        89       813        92
VIS    2025250    200200   23.1800  147.8100       8.6        79       840        92
VIS    2025250    200200   23.1900  147.7900       8.0        79       845        92
VIS    2025250    200200   23.1700  147.7700       8.3        80       849        93
VIS    2025250    200200   23.1700  147.7400       8.9        77       902        94
VIS    2025250    200200   23.1700  147.7000      10.0        80       903        94
VIS    2025250    200200   23.1700  147.6800      10.3        82       902        95
VIS    2025250    200200   23.1800  147.6700       9.7        86       897        95
VIS    2025250    200200   23.1800  147.6300       8.9        87       896        95
VIS    2025250    200200   23.1800  147.6200       9.2        85       895        97
VIS    2025250    200200   23.1600  147.5900       9.4        85       895        97
VIS    2025250    200200   23.1600  147.5500       8.9        91       898        99
VIS    2025250    200200   23.1800  147.3800      10.7        82       941        95
VIS    2025250    200200   23.1700  147.3500      10.2        86       946        97
VIS    2025250    200200   23.1700  147.3200       9.6        88       954        99
VIS    2025250    200200   23.1700  146.7500      10.7        86       979       100
VIS    2025250    200200   23.1700  146.7300      11.1        84       975       100
VIS    2025250    200200   23.1700  146.7100      11.0        86       959        98
VIS    2025250    200200   23.1700  146.6700      10.9        91       959       100
VIS    2025250    200200   23.1700  146.6700      10.8        91       959       100
VIS    2025250    200200   23.1700  146.6300      10.4        89       954       100
VIS    2025250    200200   23.1700  146.6200      10.3        88       958        99
VIS    2025250    200200   23.1700  146.5800      10.4        92       953        98
VIS    2025250    200200   23.1600  146.5700      10.5        93       939        98
VIS    2025250    200200   23.1700  146.5300      10.8        97       925        95
VIS    2025250    200200   23.1500  146.5000      10.8        99       916        97
VIS    2025250    200200   23.1600  146.4700      10.6        96       916        99
VIS    2025250    200200   23.1600  146.4500      10.6        95       916        99
VIS    2025250    200200   23.1500  146.4400      11.0        96       915        98
VIS    2025250    200200   23.1500  146.4000      11.1        95       915        99
VIS    2025250    200200   23.1500  146.3700       9.8        89       914        99
VIS    2025250    200200   23.1500  146.3600       9.8        87       914        99
VIS    2025250    200200   23.1700  146.3200      10.2        87       916        98
VIS    2025250    200200   23.1600  146.3000      10.1        89       919        99
VIS    2025250    200200   23.1500  146.2700      10.1        88       926        95
VIS    2025250    200200   23.1600  146.2500      10.4        89       929        97
VIS    2025250    200200   23.1400  145.9800      13.2        92       996        96
VIS    2025250    200200   23.1600  145.9400      12.2        92       979        99
VIS    2025250    200200   23.1500  145.9200      12.2        90       934        98
VIS    2025250    200200   23.1500  145.9000      11.4        91       933        98
VIS    2025250    200200   23.1600  145.8800      10.7        93       934        97
VIS    2025250    200200   23.1600  145.8500       9.6        92       920        94
VIS    2025250    200200   23.1400  145.8100       9.7        87       918        98
VIS    2025250    200200   23.1400  145.7800      10.1        89       919        99
VIS    2025250    200200   23.1500  145.7600      10.4        90       919        99
VIS    2025250    200200   23.1500  145.7400      10.4        87       919        99
VIS    2025250    200200   23.1400  145.7200      10.4        84       925        98
VIS    2025250    200200   23.1400  145.7000      10.7        83       936        98
VIS    2025250    200200   23.1500  145.6800      10.6        87       961        97
VIS    2025250    200200   23.1100  142.7500      10.8       104       981        94
VIS    2025250    200200   23.1200  142.7200      11.8       103       975        96
VIS    2025250    200200   23.1100  142.6900      11.5       101       940        97
VIS    2025250    200200   23.1200  142.6700      10.9        99       940        98
VIS    2025250    200200   23.1300  142.6200      10.6        99       972        98
VIS    2025250    200200   23.1300  142.6100      10.6       100       971        97
VIS    2025250    200200   23.1300  142.5900      10.4       100       964        96
VIS    2025250    200200   23.1100  142.5400      10.0        96       961        99
VIS    2025250    200200   23.1200  142.5200      10.5       101       941        98
VIS    2025250    200200   23.1200  142.5100      10.5       101       935        98
VIS    2025250    200200   23.1200  142.4800      10.4       101       926        97
VIS    2025250    200200   23.2100  152.0800       8.4        90       983        92
VIS    2025250    200200   23.2300  152.0600       8.0        91       987        93
VIS    2025250    200200   23.2200  152.0500       7.9        92       986        94
VIS    2025250    200200   23.2300  152.0000       7.2        97       979        98
VIS    2025250    200200   23.2300  151.9700       7.2        98       979        91
VIS    2025250    200200   23.2100  151.9400       6.7        97       976        98
VIS    2025250    200200   23.2000  151.9200       6.7        99       959        99
VIS    2025250    200200   23.2000  151.9100       6.5        97       958        99
VIS    2025250    200200   23.2100  151.8600       6.8        93       956        94
VIS    2025250    200200   23.2000  151.5300       6.9        98       976        96
VIS    2025250    200200   23.2000  151.5000       6.5        97       976        97
VIS    2025250    200200   23.2100  151.4800       6.7       103       940        99
VIS    2025250    200200   23.2200  151.4600       7.3       109       899        94
VIS    2025250    200200   23.2000  151.4300       7.1       107       860        93
VIS    2025250    200200   23.2100  151.3700       5.9        95       882        92
VIS    2025250    200200   23.1900  151.3300       5.5        94       867        97
VIS    2025250    200200   23.2000  151.3000       5.7        94       865        97
VIS    2025250    200200   23.2000  151.2800       5.3        93       865        96
VIS    2025250    200200   23.2100  151.2500       4.7        95       901        92
VIS    2025250    200200   23.1900  150.0300       7.4       103       986        90
VIS    2025250    200200   23.1900  150.0000       7.4       105       969        92
VIS    2025250    200200   23.1900  150.0000       7.3       104       963        93
VIS    2025250    200200   23.1800  149.9500       6.7        92       884        90
VIS    2025250    200200   23.1800  149.9400       6.8        91       878        92
VIS    2025250    200200   23.1800  149.9000       7.0        89       873        91
VIS    2025250    200200   23.1900  149.8900       6.7        87       873        90
VIS    2025250    200200   23.1700  149.8300       6.9        92       873        95
VIS    2025250    200200   23.1900  149.8100       8.2        83       883        92
VIS    2025250    200200   23.1900  149.7800       7.8        96       905        90
VIS    2025250    200200   23.1700  149.7300       7.6       102       872        94
VIS    2025250    200200   23.1900  149.7000       7.4       104       857        99
VIS    2025250    200200   23.1900  149.6800       7.2       108       855        99
VIS    2025250    200200   23.1900  149.6500       6.1       109       837        91
VIS    2025250    200200   23.1800  149.5500       6.2       104       878        92
VIS    2025250    200200   23.1900  149.5300       7.6       104       960        90
VIS    2025250    200200   23.1600  148.5600       9.4        91       988        99
VIS    2025250    200200   23.1600  148.5400       9.1        95       971        98
VIS    2025250    200200   23.1700  148.5200       8.8        95       934        98
VIS    2025250    200200   23.1500  148.4800       9.3        97       885        97
VIS    2025250    200200   23.1500  148.4600       9.6        97       883        97
VIS    2025250    200200   23.1600  148.4400       9.4        98       880        97
VIS    2025250    200200   23.1700  148.4000       9.2       100       880        97
VIS    2025250    200200   23.1600  148.3700       9.4       102       881        97
VIS    2025250    200200   23.1700  148.3700       9.6       104       881        96
VIS    2025250    200200   23.1700  148.3300      10.8       105       880        91
VIS    2025250    200200   23.1600  148.3000      10.4        94       881        93
VIS    2025250    200200   23.1500  148.2900      10.3        92       882        93
VIS    2025250    200200   23.1500  148.2500       9.8        93       881        95
VIS    2025250    200200   23.1500  148.2200      10.0        95       836        95
VIS    2025250    200200   23.1600  148.2100      10.3       100       834        95
VIS    2025250    200200   23.1600  148.1900      10.3       102       834        96
VIS    2025250    200200   23.1400  148.1400      10.1       100       893        98
VIS    2025250    200200   23.1600  148.1200       9.4        92       919       100
VIS    2025250    200200   23.1500  148.1000       9.4        86       931        99
VIS    2025250    200200   23.1600  148.0700       9.1        88       915        97
VIS    2025250    200200   23.1600  148.0500       9.3        89       863        93
VIS    2025250    200200   23.1600  148.0100       9.5        88       824        92
VIS    2025250    200200   23.1600  148.0000       9.4        88       824        93
VIS    2025250    200200   23.1500  147.9700       9.8        89       861        95
VIS    2025250    200200   23.1500  147.9500       9.5        90       861        96
VIS    2025250    200200   23.1600  147.9300       9.2        96       845        97
VIS    2025250    200200   23.1600  147.8900       9.6        83       840        92
VIS    2025250    200200   23.1600  147.8800       9.7        81       840        91
VIS    2025250    200200   23.1500  147.8300      11.0        82       856        90
VIS    2025250    200200   23.1500  147.8300      10.9        83       856        91
VIS    2025250    200200   23.1500  147.8000       9.6        83       856        93
VIS    2025250    200200   23.1400  147.7600       9.9        82       876        94
VIS    2025250    200200   23.1400  147.7500      10.1        83       902        96
VIS    2025250    200200   23.1500  147.7100      10.1        81       903        95
VIS    2025250    200200   23.1600  147.6800      10.5        80       904        94
VIS    2025250    200200   23.1600  147.6800      10.5        80       903        94
VIS    2025250    200200   23.1400  147.6500      10.6        78       906        93
VIS    2025250    200200   23.1500  147.6200       9.8        82       897        94
VIS    2025250    200200   23.1600  147.5800       9.4        86       897        97
VIS    2025250    200200   23.1400  147.5600       8.9        89       902        98
VIS    2025250    200200   23.1400  146.7500      10.6        86       985       100
VIS    2025250    200200   23.1400  146.7200      10.8        87       960        99
VIS    2025250    200200   23.1500  146.7200      10.8        87       958        99
VIS    2025250    200200   23.1300  146.6800      10.8        90       943        99
VIS    2025250    200200   23.1300  146.6600      10.7        90       934        98
VIS    2025250    200200   23.1400  146.6400      10.6        88       938        97
VIS    2025250    200200   23.1500  146.6100      10.5        89       939        99
VIS    2025250    200200   23.1300  146.5700      10.3        89       930        98
VIS    2025250    200200   23.1300  146.5600      10.3        91       930        99
VIS    2025250    200200   23.1200  146.5300      10.4        94       922        98
VIS    2025250    200200   23.1400  146.5100      10.8        98       916        97
VIS    2025250    200200   23.1400  146.4800      10.7        97       916        99
VIS    2025250    200200   23.1400  146.4600      10.6        95       916        99
VIS    2025250    200200   23.1200  146.4300      10.7        91       916        99
VIS    2025250    200200   23.1200  146.4000      10.9        89       916       100
VIS    2025250    200200   23.1300  146.3700      10.5        86       916        99
VIS    2025250    200200   23.1400  146.3500      10.3        86       916        99
VIS    2025250    200200   23.1200  146.3300      10.2        84       921        97
VIS    2025250    200200   23.1400  146.2900       9.6        87       924        97
VIS    2025250    200200   23.1400  146.2600      10.0        87       938        94
VIS    2025250    200200   23.1400  146.2600      10.1        88       938        95
VIS    2025250    200200   23.1300  145.9500      13.1        90       988        97
VIS    2025250    200200   23.1400  145.9500      12.9        90       988        98
VIS    2025250    200200   23.1400  145.9100      12.1        91       933        99
VIS    2025250    200200   23.1400  145.8900      11.4        91       925        99
VIS    2025250    200200   23.1400  145.8700      10.4        93       918        96
VIS    2025250    200200   23.1300  145.8400      10.3        94       918        96
VIS    2025250    200200   23.1200  145.8000      10.1        88       918        99
VIS    2025250    200200   23.1200  145.7800      10.2        88       918        99
VIS    2025250    200200   23.1200  145.7500      10.3        89       919        99
VIS    2025250    200200   23.1300  145.7300      10.2        87       925        98
VIS    2025250    200200   23.1300  145.7000      10.8        85       948        98
VIS    2025250    200200   23.0900  142.7200      10.8        96       975        99
VIS    2025250    200200   23.0900  142.7000      10.7        95       935        99
VIS    2025250    200200   23.0900  142.6800      10.8        98       934        99
VIS    2025250    200200   23.0900  142.6500      10.4        98       936        98
VIS    2025250    200200   23.1100  142.5700      10.0        97       985        96
VIS    2025250    200200   23.0900  142.5500       9.7        95       980        99
VIS    2025250    200200   23.1100  142.5400       9.9        95       968        99
VIS    2025250    200200   23.1100  142.5100      10.2       100       935        98
VIS    2025250    200200   23.0900  142.4700      10.0       100       924        98
VIS    2025250    200200   23.0900  142.4700       9.9       100       924        98
VIS    2025250    200200   23.1900  152.0700       8.1        90       946        93
VIS    2025250    200200   23.1800  152.0700       7.9        90       937        95
VIS    2025250    200200   23.1900  152.0200       7.7        95       943        96
VIS    2025250    200200   23.1800  152.0100       7.5        96       935        97
VIS    2025250    200200   23.1800  151.9900       7.2        97       935        96
VIS    2025250    200200   23.1800  151.9500       6.1        94       940        99
VIS    2025250    200200   23.1900  151.9000       6.7        97       958        97
VIS    2025250    200200   23.1900  151.8800       6.8        98       958        96
VIS    2025250    200200   23.1800  151.8500       6.7        97       958        97
VIS    2025250    200200   23.1800  151.5400       6.9        99       976        96
VIS    2025250    200200   23.1700  151.5100       6.6        98       911       100
VIS    2025250    200200   23.1800  151.4900       6.3        96       905        99
VIS    2025250    200200   23.1900  151.4500       6.9       105       860        95
VIS    2025250    200200   23.1900  151.4300       7.0       105       859        95
VIS    2025250    200200   23.1700  151.4000       6.1        92       855        98
VIS    2025250    200200   23.1700  151.3700       6.1        92       857        96
VIS    2025250    200200   23.1800  151.3600       5.9        98       862        92
VIS    2025250    200200   23.1900  151.3200       5.5        97       865        96
VIS    2025250    200200   23.1900  151.3100       5.5        98       865        96
VIS    2025250    200200   23.1800  151.2900       5.4        98       866        95
VIS    2025250    200200   23.1600  149.9900       8.1        99       963        92
VIS    2025250    200200   23.1700  149.9700       7.3        96       910        96
VIS    2025250    200200   23.1600  149.9400       6.7        93       881        92
VIS    2025250    200200   23.1400  149.9100       7.7        93       875        94
VIS    2025250    200200   23.1500  149.8200       7.7       100       874        99
VIS    2025250    200200   23.1500  149.8000       8.4       100       886        99
VIS    2025250    200200   23.1400  149.7800       7.9        95       890        96
VIS    2025250    200200   23.1600  149.7400       7.3       102       872        95
VIS    2025250    200200   23.1600  149.7100       7.6       107       855       100
VIS    2025250    200200   23.1400  149.6700       8.2       107       844        98
VIS    2025250    200200   23.1500  149.6600       8.1       107       844        99
VIS    2025250    200200   23.1200  148.5700       9.6       100       930        98
VIS    2025250    200200   23.1200  148.5400       9.3       108       909        97
VIS    2025250    200200   23.1400  148.5200       8.8       102       898        98
VIS    2025250    200200   23.1300  148.4800       8.8        93       883        95
VIS    2025250    200200   23.1300  148.4700       9.0        91       882        93
VIS    2025250    200200   23.1400  148.4400       9.5        95       880        93
VIS    2025250    200200   23.1400  148.4000       9.7        98       880        96
VIS    2025250    200200   23.1300  148.3700       9.7        98       880        96
VIS    2025250    200200   23.1300  148.3500      10.0        95       880        95
VIS    2025250    200200   23.1400  148.3200      10.7        91       881        93
VIS    2025250    200200   23.1200  148.3100      10.0        88       882        92
VIS    2025250    200200   23.1400  148.2800      10.0        90       882        93
VIS    2025250    200200   23.1300  148.2500       9.7        92       881        94
VIS    2025250    200200   23.1300  148.2400       9.5        93       837        94
VIS    2025250    200200   23.1400  148.2100       9.7        94       836        95
VIS    2025250    200200   23.1400  148.1800       9.8       100       837        97
VIS    2025250    200200   23.1200  148.1500      10.0       101       906        98
VIS    2025250    200200   23.1300  148.1100       9.9        92       920        99
VIS    2025250    200200   23.1300  148.1000       9.6        88       931        99
VIS    2025250    200200   23.1200  148.0800       9.4        86       922        98
VIS    2025250    200200   23.1200  148.0500       9.5        88       865        95
VIS    2025250    200200   23.1200  148.0300       9.7        89       833        93
VIS    2025250    200200   23.1300  148.0000      10.0        89       833        93
VIS    2025250    200200   23.1300  147.9600       9.8        89       865        95
VIS    2025250    200200   23.1300  147.9400       9.6        93       861        96
VIS    2025250    200200   23.1200  147.9300       9.9        93       856        94
VIS    2025250    200200   23.1200  147.9000       9.7        93       856        95
VIS    2025250    200200   23.1300  147.8700       9.5        83       858        92
VIS    2025250    200200   23.1300  147.8400      10.4        84       876        92
VIS    2025250    200200   23.1300  147.8200      10.4        85       863        92
VIS    2025250    200200   23.1200  147.7800       9.3        84       863        95
VIS    2025250    200200   23.1200  147.7700       9.4        84       876        95
VIS    2025250    200200   23.1200  147.7400      10.0        83       902        96
VIS    2025250    200200   23.1300  147.7200      10.2        82       903        96
VIS    2025250    200200   23.1100  147.6800      10.0        81       909        96
VIS    2025250    200200   23.1200  147.6500      10.8        78       909        94
VIS    2025250    200200   23.1200  147.6500      10.8        79       909        94
VIS    2025250    200200   23.1200  147.6100      10.1        81       902        94
VIS    2025250    200200   23.1100  147.5800       9.3        85       904        97
VIS    2025250    200200   23.1200  147.5500       8.9        88       904        98
VIS    2025250    200200   23.1100  147.5400       9.0        87       920        99
VIS    2025250    200200   23.1000  146.8000      11.3        94       998        95
VIS    2025250    200200   23.1000  146.7900      11.4        94       991        95
VIS    2025250    200200   23.1000  146.7600      11.2        91       991        98
VIS    2025250    200200   23.1100  146.7300      10.9        90       960        99
VIS    2025250    200200   23.1200  146.7000      10.8        92       948        99
VIS    2025250    200200   23.1200  146.7000      10.8        92       943        99
VIS    2025250    200200   23.1200  146.6600      10.6        90       920        98
VIS    2025250    200200   23.1000  146.6300      10.2        91       916        98
VIS    2025250    200200   23.1100  146.6100      10.2        90       919        96
VIS    2025250    200200   23.1200  146.6000      10.2        90       922        97
VIS    2025250    200200   23.1200  146.5600      10.3        91       922        99
VIS    2025250    200200   23.1200  146.5300      10.3        94       919        99
VIS    2025250    200200   23.1000  146.5200      10.5        94       916        98
VIS    2025250    200200   23.1000  146.4700      10.2        90       916        98
VIS    2025250    200200   23.1000  146.4600      10.2        88       916        98
VIS    2025250    200200   23.1100  146.4400      10.1        87       917        97
VIS    2025250    200200   23.1100  146.4000      10.6        87       917        99
VIS    2025250    200200   23.1000  146.3700      10.4        87       917        98
VIS    2025250    200200   23.1000  146.3700      10.4        87       918        98
VIS    2025250    200200   23.1200  146.3400      10.2        84       921        97
VIS    2025250    200200   23.1100  146.3100       9.6        86       935        96
VIS    2025250    200200   23.0900  145.9700      12.2        89       973        99
VIS    2025250    200200   23.1000  145.9600      12.4        89       973        98
VIS    2025250    200200   23.1000  145.9300      12.6        91       935        98
VIS    2025250    200200   23.1100  145.9000      11.6        92       918        99
VIS    2025250    200200   23.1000  145.8800      10.9        93       918        99
VIS    2025250    200200   23.0900  145.8600      10.5        96       917        99
VIS    2025250    200200   23.0900  145.8100      10.2        92       918        99
VIS    2025250    200200   23.0900  145.7900      10.2        90       919        99
VIS    2025250    200200   23.1000  145.7600      10.4        90       919       100
VIS    2025250    200200   23.1000  145.7600      10.4        90       919       100
VIS    2025250    200200   23.0900  145.7200      10.5        88       929        99
VIS    2025250    200200   23.0900  145.6900      10.9        84       963        97
VIS    2025250    200200   23.0800  142.7500      10.9       104       981        93
VIS    2025250    200200   23.0700  142.7100      10.4        93       932       100
VIS    2025250    200200   23.0800  142.7000      10.5        93       932       100
VIS    2025250    200200   23.0700  142.6700      10.7        97       923        99
VIS    2025250    200200   23.0600  142.6400      10.5        97       925        95
VIS    2025250    200200   23.0600  142.6300      10.4        97       928        95
VIS    2025250    200200   23.0600  142.5900      10.6        98       971        99
VIS    2025250    200200   23.0600  142.5800      10.6        99       971        99
VIS    2025250    200200   23.0600  142.5600       9.7        96       971        99
VIS    2025250    200200   23.0800  142.5300       9.7        94       937        99
VIS    2025250    200200   23.0600  142.5000       9.6        96       928        99
VIS    2025250    200200   23.0800  142.4700       9.8        99       924        98
VIS    2025250    200200   23.1600  152.1700       8.6        93       980        90
VIS    2025250    200200   23.1600  152.1300       8.6        96       943        92
VIS    2025250    200200   23.1700  152.1100       8.4        97       943        94
VIS    2025250    200200   23.1700  152.0800       7.8        94       926        97
VIS    2025250    200200   23.1700  152.0600       7.5        92       926        97
VIS    2025250    200200   23.1800  152.0300       7.3        96       911        98
VIS    2025250    200200   23.1600  152.0200       6.9        98       878        99
VIS    2025250    200200   23.1800  151.9900       7.3        96       878        96
VIS    2025250    200200   23.1700  151.9500       6.0        92       880        99
VIS    2025250    200200   23.1600  151.8400       6.3        96       970        98
VIS    2025250    200200   23.1700  151.8400       6.7        98       970        96
VIS    2025250    200200   23.1500  151.5200       6.7        97       930        98
VIS    2025250    200200   23.1700  151.5100       6.7        97       930       100
VIS    2025250    200200   23.1600  151.4900       6.5       103       861        96
VIS    2025250    200200   23.1500  151.4400       6.4        96       855        98
VIS    2025250    200200   23.1500  151.4100       6.2        91       854        96
VIS    2025250    200200   23.1400  151.4000       6.0        91       854        96
VIS    2025250    200200   23.1600  151.3700       6.1        89       856        97
VIS    2025250    200200   23.1400  151.3300       5.5        93       875        90
VIS    2025250    200200   23.1400  151.3200       5.3        95       900        90
VIS    2025250    200200   23.1300  149.9900       8.9        99       923        95
VIS    2025250    200200   23.1300  149.9900       8.7        99       911        97
VIS    2025250    200200   23.1200  149.9400       8.0       103       877        99
VIS    2025250    200200   23.1200  149.9300       8.3       104       876       100
VIS    2025250    200200   23.1300  149.8900       7.2        96       875        95
VIS    2025250    200200   23.1300  149.8700       6.1        99       873        90
VIS    2025250    200200   23.1300  149.8400       6.8       106       874        98
VIS    2025250    200200   23.1300  149.8300       7.5       107       874        99
VIS    2025250    200200   23.1300  149.8000       8.1       103       889       100
VIS    2025250    200200   23.1400  149.7800       7.9        97       890        98
VIS    2025250    200200   23.1300  149.7500       7.0        97       886        96
VIS    2025250    200200   23.1300  149.7100       7.4       103       869        99
VIS    2025250    200200   23.1300  149.6800       8.1       109       855        99
VIS    2025250    200200   23.1100  149.6500       8.1       110       844        95
VIS    2025250    200200   23.1300  149.6500       8.1       108       823        92
VIS    2025250    200200   23.1000  148.6000       9.3        99       969        99
VIS    2025250    200200   23.1200  148.5800      10.0        96       930        98
VIS    2025250    200200   23.1000  148.5500       9.6       103       895        97
VIS    2025250    200200   23.1200  148.5300       9.1       108       895        96
VIS    2025250    200200   23.1000  148.5100       8.9       103       887        96
VIS    2025250    200200   23.1000  148.5000       8.5        97       882        95
VIS    2025250    200200   23.1200  148.4700       8.6        90       882        91
VIS    2025250    200200   23.1000  148.4300       9.3        94       880        97
VIS    2025250    200200   23.1100  148.4000      10.1        98       879        95
VIS    2025250    200200   23.1000  148.3800      10.2        97       879        94
VIS    2025250    200200   23.1000  148.3600      10.4        99       880        94
VIS    2025250    200200   23.1100  148.3300      10.4        95       880        93
VIS    2025250    200200   23.1100  148.3200      10.1        94       881        93
VIS    2025250    200200   23.1000  148.2700      10.3        97       883        94
VIS    2025250    200200   23.1200  148.2500       9.9        94       881        94
VIS    2025250    200200   23.1000  148.2300       9.2        94       850        96
VIS    2025250    200200   23.0900  148.1900       8.8        98       872       100
VIS    2025250    200200   23.1000  148.1900       9.0        98       872        99
VIS    2025250    200200   23.1100  148.1500      10.0       100       906        98
VIS    2025250    200200   23.0900  148.1300       9.4        94       906       100
VIS    2025250    200200   23.0900  148.1100       9.0        89       858        96
VIS    2025250    200200   23.1000  148.0700       9.2        88       874        94
VIS    2025250    200200   23.1000  148.0400       9.0        89       874        97
VIS    2025250    200200   23.0900  148.0300       9.0        90       870        98
VIS    2025250    200200   23.0900  148.0000       9.3        89       867        96
VIS    2025250    200200   23.1000  147.9600       9.3        89       856        96
VIS    2025250    200200   23.1100  147.9400       9.7        89       856        94
VIS    2025250    200200   23.1100  147.9300       9.9        92       856        94
VIS    2025250    200200   23.0900  147.8900       9.7        93       856        95
VIS    2025250    200200   23.0900  147.8800       9.3        91       858        95
VIS    2025250    200200   23.0900  147.8500       9.1        88       845        93
VIS    2025250    200200   23.0900  147.8100       8.9        89       833        93
VIS    2025250    200200   23.1100  147.7900       9.3        85       856        95
VIS    2025250    200200   23.0900  147.7800       8.7        87       833        93
VIS    2025250    200200   23.1000  147.7400       9.3        85       899        96
VIS    2025250    200200   23.1000  147.7100       9.3        84       902        95
VIS    2025250    200200   23.0900  147.6800      10.0        86       903        96
VIS    2025250    200200   23.0900  147.6800      10.1        85       906        96
VIS    2025250    200200   23.1100  147.6400      10.9        79       909        94
VIS    2025250    200200   23.1000  147.6000      10.4        81       906        95
VIS    2025250    200200   23.1100  147.5500       9.1        87       919        99
VIS    2025250    200200   23.1000  146.8000      11.2        94       991        96
VIS    2025250    200200   23.1000  146.8000      11.3        94       991        96
VIS    2025250    200200   23.1000  146.7600      11.2        92       991        98
VIS    2025250    200200   23.0900  146.7300      11.0        90       947       100
VIS    2025250    200200   23.0700  146.7000      10.8        89       919       100
VIS    2025250    200200   23.0700  146.6900      10.6        90       918        99
VIS    2025250    200200   23.0800  146.6600      10.4        93       916        99
VIS    2025250    200200   23.0800  146.6400      10.4        93       915        99
VIS    2025250    200200   23.0700  146.6100      10.6        91       915        99
VIS    2025250    200200   23.0700  146.5900      10.5        92       915        99
VIS    2025250    200200   23.0900  146.5500      10.3        94       916        98
VIS    2025250    200200   23.0900  146.5200      10.5        93       916        98
VIS    2025250    200200   23.0900  146.5200      10.5        93       916        98
VIS    2025250    200200   23.0700  146.4800      10.2        93       917        96
VIS    2025250    200200   23.0800  146.4600      10.1        90       916        98
VIS    2025250    200200   23.0700  146.4300       9.8        89       919        99
VIS    2025250    200200   23.0900  146.4000      10.1        86       918        98
VIS    2025250    200200   23.0900  146.3700      10.4        86       918        97
VIS    2025250    200200   23.0900  146.3600      10.5        86       919        97
VIS    2025250    200200   23.0800  145.9800      11.9        90       996        99
VIS    2025250    200200   23.0900  145.9600      12.0        88       973        99
VIS    2025250    200200   23.0900  145.9500      12.0        88       938        98
VIS    2025250    200200   23.0800  145.9000      11.4        91       919        99
VIS    2025250    200200   23.0700  145.9000      11.3        92       919       100
VIS    2025250    200200   23.0800  145.8700      10.7        95       918        99
VIS    2025250    200200   23.0700  145.8400      10.6        94       917        99
VIS    2025250    200200   23.0700  145.8200      10.3        93       918        99
VIS    2025250    200200   23.0700  145.7800      10.5        94       922        99
VIS    2025250    200200   23.0700  145.7700      10.7        94       925        99
VIS    2025250    200200   23.0800  145.7400      10.7        90       929        99
VIS    2025250    200200   23.0600  145.7200      10.9        87       956       100
VIS    2025250    200200   23.0400  142.7300      10.7        91       964       100
VIS    2025250    200200   23.0600  142.7100      10.5        93       932       100
VIS    2025250    200200   23.0600  142.6800      10.6        93       922        99
VIS    2025250    200200   23.0500  142.6800      10.7        95       922        99
VIS    2025250    200200   23.0400  142.6500      10.9        98       920        96
VIS    2025250    200200   23.0400  142.6300      10.6        98       924        96
VIS    2025250    200200   23.0500  142.5900      10.8       100       971        98
VIS    2025250    200200   23.0600  142.5800      10.6        99       971        98
VIS    2025250    200200   23.0500  142.5500       9.8        96       953        99
VIS    2025250    200200   23.0400  142.5100      10.0        95       928        99
VIS    2025250    200200   23.0600  142.4900       9.6        96       924        99
VIS    2025250    200200   23.0400  142.4600       9.6        96       918        99
VIS    2025250    200200   23.1300  152.1500       8.0        93       968        94
VIS    2025250    200200   23.1500  152.1400       8.3        94       943        94
VIS    2025250    200200   23.1300  152.1100       7.4        93       922        97
VIS    2025250    200200   23.1500  152.0700       7.3        93       920        98
VIS    2025250    200200   23.1300  152.0700       7.1        92       917        98
VIS    2025250    200200   23.1400  152.0300       6.6        95       878        99
VIS    2025250    200200   23.1300  152.0100       6.5        87       864        96
VIS    2025250    200200   23.1500  151.9700       6.3        88       864        97
VIS    2025250    200200   23.1300  151.9600       5.9        84       862        93
VIS    2025250    200200   23.1500  151.8400       6.3        96       970        97
VIS    2025250    200200   23.1500  151.8300       6.4        96       971        95
VIS    2025250    200200   23.1200  151.8000       6.9        98       986        96
VIS    2025250    200200   23.1300  151.5300       6.5        96       981        95
VIS    2025250    200200   23.1400  151.5100       6.5       102       926       100
VIS    2025250    200200   23.1300  151.4800       6.6       104       861        96
VIS    2025250    200200   23.1200  151.4700       6.5       100       855        98
VIS    2025250    200200   23.1200  151.4300       5.6        90       854        94
VIS    2025250    200200   23.1300  151.4100       5.8        92       854        91
VIS    2025250    200200   23.1200  151.3700       5.9        87       855        90
VIS    2025250    200200   23.1300  151.3600       5.9        86       855        93
VIS    2025250    200200   23.1200  151.3300       5.8        89       891        93
VIS    2025250    200200   23.1200  151.3200       5.4        91       900        91
VIS    2025250    200200   23.0900  150.0100       8.2       102       973        92
VIS    2025250    200200   23.0900  149.9700       8.4       103       904        98
VIS    2025250    200200   23.1000  149.9400       8.1       107       877       100
VIS    2025250    200200   23.1000  149.9200       8.4       109       876       100
VIS    2025250    200200   23.1100  149.8900       7.2       102       875        94
VIS    2025250    200200   23.1000  149.8800       7.0       101       875        94
VIS    2025250    200200   23.1100  149.8300       7.4       103       875        99
VIS    2025250    200200   23.1000  149.8200       7.7       106       875        99
VIS    2025250    200200   23.0900  149.7900       7.0       106       886        96
VIS    2025250    200200   23.0900  149.7700       7.0       105       893        95
VIS    2025250    200200   23.1000  149.7400       7.2        98       894        95
VIS    2025250    200200   23.0900  149.7000       8.3       102       934       100
VIS    2025250    200200   23.1100  149.6900       8.1       108       902        99
VIS    2025250    200200   23.1100  149.6500       8.1       110       874        94
VIS    2025250    200200   23.1100  149.6500       8.0       110       844        94
VIS    2025250    200200   23.0900  148.6200       9.0       104       977        96
VIS    2025250    200200   23.0900  148.6000       9.2       104       912        98
VIS    2025250    200200   23.0900  148.5900       9.5       103       902        96
VIS    2025250    200200   23.0800  148.5400       9.6       103       888        97
VIS    2025250    200200   23.0800  148.5200       9.3       104       887        97
VIS    2025250    200200   23.0800  148.4900       8.5        98       882        96
VIS    2025250    200200   23.0900  148.4600       8.7        91       880        96
VIS    2025250    200200   23.0800  148.4400       9.2        94       881        97
VIS    2025250    200200   23.0700  148.4100       9.1        87       881        94
VIS    2025250    200200   23.0900  148.3900       9.7        92       879        95
VIS    2025250    200200   23.0900  148.3800      10.0        95       879        95
VIS    2025250    200200   23.0800  148.3500      10.1        99       882        92
VIS    2025250    200200   23.0700  148.2800      10.6       102       883        92
VIS    2025250    200200   23.0800  148.2600      10.5        99       883        93
VIS    2025250    200200   23.0800  148.2400       9.5        95       882        96
VIS    2025250    200200   23.0700  148.2000       8.1        91       866        98
VIS    2025250    200200   23.0700  148.1900       8.2        95       867        99
VIS    2025250    200200   23.0800  148.1800       9.1       100       885        99
VIS    2025250    200200   23.0700  148.1300       9.0        95       842        97
VIS    2025250    200200   23.0900  148.1100       8.8        89       838        95
VIS    2025250    200200   23.0800  148.1000       8.6        89       822        92
VIS    2025250    200200   23.0900  148.0700       9.0        91       856        96
VIS    2025250    200200   23.0700  148.0400       8.4        97       874        98
VIS    2025250    200200   23.0900  148.0000       9.2        90       867        97
VIS    2025250    200200   23.0900  148.0000       9.2        90       867        97
VIS    2025250    200200   23.0600  147.9600       8.5        89       867        98
VIS    2025250    200200   23.0700  147.9300       9.3        90       842        95
VIS    2025250    200200   23.0800  147.9000       9.7        93       856        95
VIS    2025250    200200   23.0800  147.8800       9.4        92       858        96
VIS    2025250    200200   23.0600  147.8600       9.3        90       867        97
VIS    2025250    200200   23.0800  147.8300       9.1        89       840        95
VIS    2025250    200200   23.0800  147.8100       8.9        89       831        94
VIS    2025250    200200   23.0800  147.7900       8.6        87       833        93
VIS    2025250    200200   23.0800  147.7700       8.7        87       833        93
VIS    2025250    200200   23.0800  147.7400       8.9        87       895        97
VIS    2025250    200200   23.0700  147.7000       9.5        86       900        97
VIS    2025250    200200   23.0800  147.6900       9.8        87       903        97
VIS    2025250    200200   23.0800  147.6500      10.2        84       909        97
VIS    2025250    200200   23.0700  147.6300       9.7        82       920        97
VIS    2025250    200200   23.0800  147.6100      10.2        81       920        95
VIS    2025250    200200   23.0800  147.5600       9.5        85       949        97
VIS    2025250    200200   23.0700  146.8300      12.2        94       991        95
VIS    2025250    200200   23.0600  146.8200      11.7        91       970        93
VIS    2025250    200200   23.0500  146.7900      10.7        89       948        96
VIS    2025250    200200   23.0600  146.7600      11.0        92       930       100
VIS    2025250    200200   23.0700  146.7300      11.1        90       928       100
VIS    2025250    200200   23.0500  146.7100      11.1        89       919       100
VIS    2025250    200200   23.0600  146.6900      10.7        88       917       100
VIS    2025250    200200   23.0600  146.6700      10.5        91       916        99
VIS    2025250    200200   23.0500  146.6300      10.5        92       916        99
VIS    2025250    200200   23.0600  146.6100      10.7        91       915       100
VIS    2025250    200200   23.0700  146.5900      10.6        93       915        99
VIS    2025250    200200   23.0500  146.5600      10.8        94       916       100
VIS    2025250    200200   23.0500  146.5400      10.5        92       916        99
VIS    2025250    200200   23.0500  146.5200      10.3        91       918        97
VIS    2025250    200200   23.0600  146.4800      10.4        95       918        96
VIS    2025250    200200   23.0600  146.4600      10.5        95       919        99
VIS    2025250    200200   23.0500  146.4500      10.4        94       919        99
VIS    2025250    200200   23.0600  146.4000       9.2        85       919        97
VIS    2025250    200200   23.0700  146.3800       9.9        83       918        93
VIS    2025250    200200   23.0400  146.0000      11.4        90       996       100
VIS    2025250    200200   23.0400  145.9700      11.7        91       970       100
VIS    2025250    200200   23.0600  145.9500      11.7        90       938        99
VIS    2025250    200200   23.0400  145.9400      11.7        92       935        99
VIS    2025250    200200   23.0400  145.9200      11.5        93       921        99
VIS    2025250    200200   23.0400  145.8800      11.4        92       920       100
VIS    2025250    200200   23.0400  145.8500      11.0        92       919        99
VIS    2025250    200200   23.0400  145.8400      10.9        92       919        99
VIS    2025250    200200   23.0500  145.7900      10.4        94       925        97
VIS    2025250    200200   23.0600  145.7200      11.0        86       959        99
VIS    2025250    200200   23.0200  142.7700      11.0        92       977       100
VIS    2025250    200200   23.0100  142.7500      10.8        87       964       100
VIS    2025250    200200   23.0300  142.7200      10.7        89       964       100
VIS    2025250    200200   23.0200  142.7000      10.8        92       923        99
VIS    2025250    200200   23.0200  142.6800      10.9        96       919        98
VIS    2025250    200200   23.0100  142.6400      10.9        97       919        98
VIS    2025250    200200   23.0100  142.6400      10.8        97       919        98
VIS    2025250    200200   23.0100  142.6000      10.8        99       932        98
VIS    2025250    200200   23.0100  142.5700      10.4       100       965        98
VIS    2025250    200200   23.0100  142.5500      10.1        97       963        98
VIS    2025250    200200   23.0100  142.5400      10.0        95       957        99
VIS    2025250    200200   23.0200  142.5100      10.2        94       928       100
VIS    2025250    200200   23.0100  142.4800      10.1        94       918       100
VIS    2025250    200200   23.0100  142.4600       9.8        95       918       100
VIS    2025250    200200   23.1200  152.1700       8.0        94       969        91
VIS    2025250    200200   23.1200  152.1700       7.8        93       969        92
VIS    2025250    200200   23.1300  152.1300       7.6        93       941        96
VIS    2025250    200200   23.1100  152.0900       7.1        92       906        98
VIS    2025250    200200   23.1100  152.0900       7.1        91       906        97
VIS    2025250    200200   23.1100  152.0400       7.3        87       913        95
VIS    2025250    200200   23.1200  152.0200       6.8        85       874        95
VIS    2025250    200200   23.1200  152.0100       6.6        85       864        94
VIS    2025250    200200   23.1200  151.9700       6.0        78       862        90
VIS    2025250    200200   23.1200  151.9600       5.8        83       868        92
VIS    2025250    200200   23.1200  151.7900       7.1        99       986        98
VIS    2025250    200200   23.1000  151.7500       6.8       101       995        99
VIS    2025250    200200   23.1000  151.7400       6.8       102       995        99
VIS    2025250    200200   23.1000  151.5500       7.3       102       981        91
VIS    2025250    200200   23.0900  151.5300       6.7       100       964       100
VIS    2025250    200200   23.0900  151.5000       6.7        96       926       100
VIS    2025250    200200   23.1000  151.4800       6.5        95       880        99
VIS    2025250    200200   23.1000  151.4500       6.0        93       854        96
VIS    2025250    200200   23.1000  151.3800       6.0        91       855        90
VIS    2025250    200200   23.1000  151.3400       6.1        87       870        97
VIS    2025250    200200   23.1000  151.3200       5.5        82       900        92
VIS    2025250    200200   23.1000  151.3100       5.4        83       906        90
VIS    2025250    200200   23.0900  150.0600       9.3       104       942        91
VIS    2025250    200200   23.0900  150.0000       8.3       103       966        90
VIS    2025250    200200   23.0800  149.9900       8.3       103       938        94
VIS    2025250    200200   23.0900  149.9700       8.3       103       911        98
VIS    2025250    200200   23.0800  149.9300       8.3       109       886        99
VIS    2025250    200200   23.0700  149.9100       8.4       110       878        98
VIS    2025250    200200   23.0800  149.8700       7.2       104       875        97
VIS    2025250    200200   23.0700  149.8600       7.5       103       875        98
VIS    2025250    200200   23.0800  149.8400       8.1       105       875        99
VIS    2025250    200200   23.0800  149.8100       7.5       102       870        98
VIS    2025250    200200   23.0900  149.7600       6.8       104       893        94
VIS    2025250    200200   23.0900  149.7600       6.8       105       893        93
VIS    2025250    200200   23.0600  149.7100       8.1       104       950       100
VIS    2025250    200200   23.0600  149.7100       8.2       103       950       100
VIS    2025250    200200   23.0800  149.6800       8.3       108       911        99
VIS    2025250    200200   23.0600  149.6400       7.7       109       848        99
VIS    2025250    200200   23.0800  149.6300       7.0       110       871        97
VIS    2025250    200200   23.0500  148.6300       9.1       102       957        95
VIS    2025250    200200   23.0500  148.6100       9.6       104       912        98
VIS    2025250    200200   23.0600  148.6000       9.5       104       902        98
VIS    2025250    200200   23.0500  148.5700      10.1        98       881        95
VIS    2025250    200200   23.0500  148.5400       9.7        99       881        96
VIS    2025250    200200   23.0500  148.5100       8.9       100       880        97
VIS    2025250    200200   23.0500  148.4800       8.3        97       881        99
VIS    2025250    200200   23.0600  148.4500       8.9        95       881        98
VIS    2025250    200200   23.0500  148.4300       8.6        89       882        96
VIS    2025250    200200   23.0700  148.4100       8.9        86       881        94
VIS    2025250    200200   23.0700  148.3800       9.6        87       881        93
VIS    2025250    200200   23.0600  148.3600       9.9        94       882        94
VIS    2025250    200200   23.0600  148.3400      10.1       101       887        91
VIS    2025250    200200   23.0600  148.3200      10.2       104       884        91
VIS    2025250    200200   23.0500  148.2700      10.2        98       889        94
VIS    2025250    200200   23.0500  148.2500       9.8        95       882        95
VIS    2025250    200200   23.0500  148.2400       9.5        94       882        96
VIS    2025250    200200   23.0600  148.2000       8.2        90       867        98
VIS    2025250    200200   23.0600  148.1900       8.5        94       867        99
VIS    2025250    200200   23.0400  148.1700       9.5        96       840        94
VIS    2025250    200200   23.0500  148.1300       8.8        94       814        93
VIS    2025250    200200   23.0500  148.1200       8.4        92       812        93
VIS    2025250    200200   23.0600  148.0900       8.2        91       812        92
VIS    2025250    200200   23.0400  148.0400       8.2        98       849        99
VIS    2025250    200200   23.0400  148.0400       8.2        98       849        99
VIS    2025250    200200   23.0400  148.0100       7.6        96       879        96
VIS    2025250    200200   23.0500  147.9700       8.0        89       885        97
VIS    2025250    200200   23.0500  147.9500       8.3        91       849        96
VIS    2025250    200200   23.0400  147.9200       8.7        92       842        97
VIS    2025250    200200   23.0500  147.8900       9.0        92       856        96
VIS    2025250    200200   23.0600  147.8900       9.1        92       858        96
VIS    2025250    200200   23.0500  147.8400       9.3        90       861        97
VIS    2025250    200200   23.0400  147.8100       9.2        87       842        94
VIS    2025250    200200   23.0400  147.8100       9.2        86       856        95
VIS    2025250    200200   23.0400  147.7700       8.5        86       829        92
VIS    2025250    200200   23.0400  147.7500       8.5        87       856        96
VIS    2025250    200200   23.0400  147.7200       9.2        87       900        98
VIS    2025250    200200   23.0400  147.7000       9.3        85       903        97
VIS    2025250    200200   23.0300  147.6600       9.3        85       925        99
VIS    2025250    200200   23.0200  146.8100      11.8        90       979        99
VIS    2025250    200200   23.0400  146.7700      10.6        91       931        98
VIS    2025250    200200   23.0200  146.7500      11.2        92       930        99
VIS    2025250    200200   23.0300  146.7300      11.0        92       923       100
VIS    2025250    200200   23.0300  146.7000      10.8        89       918       100
VIS    2025250    200200   23.0200  146.6900      10.8        89       917        99
VIS    2025250    200200   23.0300  146.6600      10.5        91       915        98
VIS    2025250    200200   23.0400  146.6300      10.4        90       916        98
VIS    2025250    200200   23.0400  146.6000      10.6        91       916        99
VIS    2025250    200200   23.0400  146.5900      10.7        92       916        99
VIS    2025250    200200   23.0300  146.5400      10.6        90       916       100
VIS    2025250    200200   23.0300  146.5300      10.3        89       918        98
VIS    2025250    200200   23.0300  146.5000      10.6        89       918        97
VIS    2025250    200200   23.0200  146.4700      11.8        91       919       100
VIS    2025250    200200   23.0400  146.4600      11.2        95       919       100
VIS    2025250    200200   23.0300  146.4200      10.0        91       920        99
VIS    2025250    200200   23.0200  146.3900      10.4        91       919        99
VIS    2025250    200200   23.0200  146.3900      10.4        93       919        99
VIS    2025250    200200   23.0100  146.0200      11.8        91      1000       100
VIS    2025250    200200   23.0100  146.0000      11.6        91       990       100
VIS    2025250    200200   23.0400  145.9800      11.7        91       990       100
VIS    2025250    200200   23.0300  145.9300      11.9        94       930        98
VIS    2025250    200200   23.0300  145.8900      11.7        92       923        99
VIS    2025250    200200   23.0300  145.8700      11.4        92       920       100
VIS    2025250    200200   23.0300  145.8400      10.9        92       922        99
VIS    2025250    200200   23.0000  142.7800      10.9        91       993       100
VIS    2025250    200200   22.9900  142.7500      10.8        88       961       100
VIS    2025250    200200   23.0000  142.7300      10.7        86       959        99
VIS    2025250    200200   22.9900  142.7100      10.6        90       933       100
VIS    2025250    200200   22.9800  142.6900      10.8        93       932       100
VIS    2025250    200200   22.9900  142.6500      10.8        96       921        98
VIS    2025250    200200   22.9900  142.6500      10.9        96       920        98
VIS    2025250    200200   22.9800  142.6100      10.9        96       931        98
VIS    2025250    200200   23.0000  142.5500      10.1        97       965        98
VIS    2025250    200200   23.0000  142.5500      10.1        96       963        98
VIS    2025250    200200   22.9900  142.5000      10.4        90       938       100
VIS    2025250    200200   22.9900  142.5000      10.4        90       935       100
VIS    2025250    200200   23.0000  142.4600      10.0        94       918        99
VIS    2025250    200200   23.0900  152.2200       9.0        90       988        91
VIS    2025250    200200   23.0900  152.2200       9.0        90       988        91
VIS    2025250    200200   23.0900  152.1700       8.8        88       951        90
VIS    2025250    200200   23.0900  152.1400       8.3        92       944        94
VIS    2025250    200200   23.0800  152.1300       8.3        91       944        94
VIS    2025250    200200   23.0800  152.1000       7.7        89       886        94
VIS    2025250    200200   23.0800  152.0600       7.7        88       874        95
VIS    2025250    200200   23.0900  152.0600       7.6        88       882        95
VIS    2025250    200200   23.0900  152.0200       7.3        80       862        92
VIS    2025250    200200   23.1000  152.0100       7.1        75       860        91
VIS    2025250    200200   23.0900  151.8000       7.3       106       986        92
VIS    2025250    200200   23.0900  151.7700       7.1        99       996        95
VIS    2025250    200200   23.0900  151.7500       6.9       101       995        98
VIS    2025250    200200   23.0700  151.5700       6.9        95       984        92
VIS    2025250    200200   23.0700  151.5500       7.0       100       984        99
VIS    2025250    200200   23.0900  151.5300       6.8        99       964        99
VIS    2025250    200200   23.0900  151.4900       6.6        93       926        99
VIS    2025250    200200   23.0900  151.4700       6.5        88       871        98
VIS    2025250    200200   23.0900  151.4600       6.1        90       869        96
VIS    2025250    200200   23.0700  151.4200       5.5        89       856        90
VIS    2025250    200200   23.0900  151.3400       6.2        88       900        95
VIS    2025250    200200   23.0400  149.9900       8.2        96       938        96
VIS    2025250    200200   23.0500  149.9500       8.3       104       907       100
VIS    2025250    200200   23.0500  149.9400       8.3       104       907        99
VIS    2025250    200200   23.0400  149.9000       8.0       108       879        97
VIS    2025250    200200   23.0400  149.8800       7.3       106       879        96
VIS    2025250    200200   23.0600  149.8500       7.6       105       875        96
VIS    2025250    200200   23.0600  149.8200       7.7       104       884        96
VIS    2025250    200200   23.0600  149.8100       7.6       103       884        98
VIS    2025250    200200   23.0600  149.7800       6.8        98       893        96
VIS    2025250    200200   23.0400  149.7400       7.6       112       950        98
VIS    2025250    200200   23.0500  149.7100       7.6       109       950        99
VIS    2025250    200200   23.0500  149.7100       7.7       107       948       100
VIS    2025250    200200   23.0500  149.6600       7.8       108       838        99
VIS    2025250    200200   23.0500  149.6400       7.6       109       849        99
VIS    2025250    200200   23.0400  149.6200       7.6       112       890        98
VIS    2025250    200200   23.0200  148.6500      10.2        98       957        97
VIS    2025250    200200   23.0400  148.6200       9.5       103       912        98
VIS    2025250    200200   23.0400  148.6100       9.6       103       912        98
VIS    2025250    200200   23.0400  148.5700      10.1        98       881        95
VIS    2025250    200200   23.0400  148.5400       9.6        98       878        96
VIS    2025250    200200   23.0300  148.5300       9.2        97       878        96
VIS    2025250    200200   23.0200  148.4900       8.0        95       880        99
VIS    2025250    200200   23.0200  148.4800       7.9        96       880       100
VIS    2025250    200200   23.0200  148.4400       8.5        96       882        99
VIS    2025250    200200   23.0300  148.4300       8.5        91       882        97
VIS    2025250    200200   23.0300  148.4000       8.9        86       882        93
VIS    2025250    200200   23.0300  148.3800       9.1        90       882        95
VIS    2025250    200200   23.0200  148.3400       9.4        99       891        97
VIS    2025250    200200   23.0200  148.3300       9.3        98       891        97
VIS    2025250    200200   23.0200  148.2900       8.6        91       892        96
VIS    2025250    200200   23.0200  148.2800       8.7        90       890        95
VIS    2025250    200200   23.0300  148.2400       9.0        95       872        96
VIS    2025250    200200   23.0300  148.2300       8.8        94       857        97
VIS    2025250    200200   23.0300  148.1800       9.1        92       839        93
VIS    2025250    200200   23.0300  148.1700       9.3        94       839        92
VIS    2025250    200200   23.0300  148.1400       9.5        93       812        91
VIS    2025250    200200   23.0200  148.0800       8.1        86       801        91
VIS    2025250    200200   23.0300  148.0600       8.3        93       803        93
VIS    2025250    200200   23.0200  148.0300       8.1        97       847        99
VIS    2025250    200200   23.0100  148.0200       8.1        96       847        97
VIS    2025250    200200   23.0100  147.9900       7.8        94       833        90
VIS    2025250    200200   23.0300  147.9600       7.6        90       840        94
VIS    2025250    200200   23.0300  147.9300       8.4        92       840        96
VIS    2025250    200200   23.0100  147.9000       8.2        91       872        98
VIS    2025250    200200   23.0200  147.8900       8.5        92       872        98
VIS    2025250    200200   23.0200  147.8500       9.2        89       944        99
VIS    2025250    200200   23.0300  147.8300       9.3        87       908        98
VIS    2025250    200200   23.0300  147.8200       9.3        86       908        98
VIS    2025250    200200   23.0300  147.7700       8.5        84       831        92
VIS    2025250    200200   23.0300  147.7700       8.5        85       829        92
VIS    2025250    200200   23.0300  147.7100       9.2        84       903        97
VIS    2025250    200200   23.0300  147.6700       9.4        83       922        98
VIS    2025250    200200   23.0200  146.8400      12.2        87       999        98
VIS    2025250    200200   23.0200  146.8100      11.7        89       962        99
VIS    2025250    200200   23.0000  146.7900      11.6        89       979        97
VIS    2025250    200200   23.0000  146.7700      11.4        88       957        99
VIS    2025250    200200   23.0200  146.7500      11.2        91       930        99
VIS    2025250    200200   23.0000  146.7100      11.0        87       921        99
VIS    2025250    200200   23.0100  146.6800      10.9        88       915        98
VIS    2025250    200200   23.0000  146.6600      11.0        90       915        99
VIS    2025250    200200   23.0100  146.6500      10.8        91       915        99
VIS    2025250    200200   23.0100  146.6200      10.6        88       916        99
VIS    2025250    200200   23.0000  146.5800      10.6        91       916       100
VIS    2025250    200200   23.0000  146.5700      10.6        91       916       100
VIS    2025250    200200   23.0000  146.5300      10.4        88       918        98
VIS    2025250    200200   23.0000  146.5200      10.4        87       918        97
VIS    2025250    200200   23.0000  146.4800      11.3        87       919        99
VIS    2025250    200200   22.9900  146.4600      11.5        89       919        99
VIS    2025250    200200   22.9900  146.4400      11.0        90       920        98
VIS    2025250    200200   23.0100  146.4000      10.3        92       920        99
VIS    2025250    200200   23.0000  146.0300      11.8        89      1000        98
VIS    2025250    200200   23.0000  146.0000      11.7        91      1000       100
VIS    2025250    200200   23.0000  145.9800      11.7        90       971       100
VIS    2025250    200200   22.9900  145.9600      11.7        91       970       100
VIS    2025250    200200   22.9900  145.9300      11.9        90       959        97
VIS    2025250    200200   23.0100  145.9200      11.9        94       945        97
VIS    2025250    200200   23.0000  145.8800      11.7        91       941        99
VIS    2025250    200200   22.9700  143.5900      10.5        95       989        97
VIS    2025250    200200   22.9700  143.5800      10.5        94       989        96
VIS    2025250    200200   22.9700  143.5600      10.3        93       992        96
VIS    2025250    200200   22.9700  143.5300       9.0        90       985        98
VIS    2025250    200200   22.9600  143.4400      10.7        94       998        92
VIS    2025250    200200   22.9600  143.4400      10.3        93       998        93
VIS    2025250    200200   22.9600  142.8200      10.5        87       994        98
VIS    2025250    200200   22.9600  142.7900      10.5        87       997        99
VIS    2025250    200200   22.9600  142.7800      10.5        88       994        99
VIS    2025250    200200   22.9700  142.7400      10.6        87       961       100
VIS    2025250    200200   22.9600  142.7200      10.4        91       960       100
VIS    2025250    200200   22.9600  142.7100      10.5        92       960       100
VIS    2025250    200200   22.9700  142.6800      10.8        95       936        99
VIS    2025250    200200   22.9600  142.6400      10.6        95       930        98
VIS    2025250    200200   22.9600  142.6300      10.5        95       930        98
VIS    2025250    200200   22.9700  142.6100      10.9        96       932        98
VIS    2025250    200200   22.9600  142.5600      10.2        96       960        97
VIS    2025250    200200   22.9600  142.5600      10.1        96       960        97
VIS    2025250    200200   22.9600  142.5300       9.7        92       977        98
VIS    2025250    200200   22.9800  142.5100      10.2        90       967       100
VIS    2025250    200200   22.9800  142.4600      10.2        93       922        99
VIS    2025250    200200   22.9800  142.4600      10.2        92       922        99
VIS    2025250    200200   23.0800  152.2000       8.9        86       969        90
VIS    2025250    200200   23.0700  152.0800       7.9        87       882        93
VIS    2025250    200200   23.0600  152.0400       8.0        84       862        90
VIS    2025250    200200   23.0500  152.0300       7.8        83       862        91
VIS    2025250    200200   23.0600  151.9900       6.3        73       861        94
VIS    2025250    200200   23.0700  151.9600       5.2        67       864        90
VIS    2025250    200200   23.0600  151.7900       7.7        99       996        95
VIS    2025250    200200   23.0500  151.7700       7.3        98       990        96
VIS    2025250    200200   23.0600  151.5600       6.9       100       984        99
VIS    2025250    200200   23.0500  151.5300       6.8        97       984        99
VIS    2025250    200200   23.0500  151.5000       6.4        93       964        98
VIS    2025250    200200   23.0400  151.5000       6.3        89       954        97
VIS    2025250    200200   23.0600  151.4500       5.6        85       871        95
VIS    2025250    200200   23.0400  151.4300       5.8        82       869        94
VIS    2025250    200200   23.0500  151.4200       5.6        84       861        94
VIS    2025250    200200   23.0200  150.0100       9.2        98       925        95
VIS    2025250    200200   23.0200  149.9900       8.4        93       898        96
VIS    2025250    200200   23.0200  149.9600       7.9        97       891        98
VIS    2025250    200200   23.0300  149.9500       8.3       103       891        99
VIS    2025250    200200   23.0300  149.9200       8.8       112       869        99
VIS    2025250    200200   23.0400  149.9000       8.3       111       878        99
VIS    2025250    200200   23.0400  149.8800       7.4       108       879        97
VIS    2025250    200200   23.0100  149.8500       7.1       107       925        91
VIS    2025250    200200   23.0300  149.7800       7.0        98       918        97
VIS    2025250    200200   23.0300  149.7600       7.4       106       957        91
VIS    2025250    200200   23.0300  149.7400       7.6       112       950        91
VIS    2025250    200200   23.0100  149.7000       6.4       109       896        93
VIS    2025250    200200   23.0100  149.6900       6.6       106       896        93
VIS    2025250    200200   23.0200  149.6600       7.6       106       849        98
VIS    2025250    200200   23.0100  149.6400       7.8       107       867        99
VIS    2025250    200200   23.0000  148.6800       9.0        99       975        94
VIS    2025250    200200   23.0200  148.6500      10.1        98       957        96
VIS    2025250    200200   23.0100  148.6200      10.5       104       890        94
VIS    2025250    200200   23.0000  148.6100      10.7       105       888        92
VIS    2025250    200200   23.0100  148.5700      10.4       100       878        94
VIS    2025250    200200   23.0100  148.5500       9.8        96       878        96
VIS    2025250    200200   23.0000  148.5400       9.6        96       878        96
VIS    2025250    200200   23.0100  148.5000       8.3        93       879        99
VIS    2025250    200200   23.0100  148.4800       7.8        96       880       100
VIS    2025250    200200   23.0100  148.4600       8.0        98       882        99
VIS    2025250    200200   23.0100  148.4100       8.9        95       883        97
VIS    2025250    200200   23.0000  148.4000       9.7        98       894        95
VIS    2025250    200200   23.0100  148.3600       9.3        99       896        98
VIS    2025250    200200   23.0100  148.3500       9.5        99       893        97
VIS    2025250    200200   23.0100  148.3100       9.3        98       893        97
VIS    2025250    200200   23.0100  148.2900       8.9        95       892        98
VIS    2025250    200200   23.0100  148.2800       8.7        91       892        96
VIS    2025250    200200   23.0000  148.2500       8.5        90       879        94
VIS    2025250    200200   23.0100  148.2200       8.7        91       839        95
VIS    2025250    200200   22.9900  148.1800       9.2        90       812        91
VIS    2025250    200200   23.0000  148.1800       9.1        90       812        90
VIS    2025250    200200   22.9900  148.0400       8.5        87       806        91
VIS    2025250    200200   23.0100  148.0200       8.2        95       833        97
VIS    2025250    200200   23.0100  147.9900       8.0        95       833        90
VIS    2025250    200200   22.9900  147.9600       7.7        91       831        94
VIS    2025250    200200   22.9900  147.9300       7.5        87       856        96
VIS    2025250    200200   23.0000  147.9200       7.7        90       856        96
VIS    2025250    200200   23.0100  147.8800       8.4        89       920        98
VIS    2025250    200200   23.0000  147.8700       8.4        88       944        97
VIS    2025250    200200   23.0100  147.8300       9.4        85       952        98
VIS    2025250    200200   23.0100  147.8200       9.4        85       952        98
VIS    2025250    200200   22.9900  147.7800       8.7        84       919        92
VIS    2025250    200200   23.0000  147.7500       8.7        86       919        97
VIS    2025250    200200   22.9900  146.7800      11.5        89       979        97
VIS    2025250    200200   22.9900  146.7800      11.5        88       979        97
VIS    2025250    200200   22.9900  146.7500      11.1        88       936        98
VIS    2025250    200200   22.9900  146.7100      11.2        85       921        99
VIS    2025250    200200   22.9700  146.6900      11.2        85       918        99
VIS    2025250    200200   22.9800  146.6600      10.9        91       915        99
VIS    2025250    200200   22.9800  146.6300      10.6        90       915       100
VIS    2025250    200200   22.9700  146.6000      10.2        89       915        99
VIS    2025250    200200   22.9700  146.6000      10.2        89       915        99
VIS    2025250    200200   22.9800  146.5500      10.4        91       916       100
VIS    2025250    200200   22.9800  146.5300      10.3        90       918        99
VIS    2025250    200200   22.9700  146.5100      10.3        90       918        97
VIS    2025250    200200   22.9700  146.4900      10.2        90       919        98
VIS    2025250    200200   22.9700  146.4600      10.1        88       920        99
VIS    2025250    200200   22.9700  146.4400       9.3        86       920        98
VIS    2025250    200200   22.9700  146.0000      11.4        91       996        98
VIS    2025250    200200   22.9800  145.9700      11.7        90       973        99
VIS    2025250    200200   22.9700  145.9500      12.1        90       973        99
VIS    2025250    200200   22.9600  145.9300      11.8        88       973        99
VIS    2025250    200200   22.9500  143.6400      11.2        98       996        94
VIS    2025250    200200   22.9500  143.6100      10.6        97       989        97
VIS    2025250    200200   22.9600  143.6000      10.7        97       989        97
VIS    2025250    200200   22.9500  143.5700       9.6        91       984        96
VIS    2025250    200200   22.9600  143.5500       9.7        91       984        98
VIS    2025250    200200   22.9600  143.5100       8.4        90       984        90
VIS    2025250    200200   22.9400  143.4900      10.4        95       984       100
VIS    2025250    200200   22.9400  143.4600      11.0        96       973        99
VIS    2025250    200200   22.9300  142.8200      10.5        89       994       100
VIS    2025250    200200   22.9300  142.8000      10.4        89       994       100
VIS    2025250    200200   22.9300  142.7700      10.4        89       965       100
VIS    2025250    200200   22.9300  142.7600      10.2        89       965       100
VIS    2025250    200200   22.9400  142.7300      10.2        89       960       100
VIS    2025250    200200   22.9500  142.7100      10.3        91       960       100
VIS    2025250    200200   22.9400  142.6700      11.0        94       941        99
VIS    2025250    200200   22.9300  142.6600      11.1        93       936        99
VIS    2025250    200200   22.9500  142.6300      10.4        94       930        98
VIS    2025250    200200   22.9300  142.6100      10.3        93       930        98
VIS    2025250    200200   22.9400  142.5800      10.2        94       941        99
VIS    2025250    200200   22.9500  142.5600       9.9        94       960        98
VIS    2025250    200200   22.9500  142.5300       9.4        93       977        99
VIS    2025250    200200   22.9400  142.4900       9.5        94       977        99
VIS    2025250    200200   22.9500  142.4900       9.8        94       969       100
VIS    2025250    200200   23.0300  152.0300       7.8        83       862        92
VIS    2025250    200200   23.0500  152.0200       7.6        82       862        93
VIS    2025250    200200   23.0200  151.9900       6.4        85       863        99
VIS    2025250    200200   23.0400  151.9700       5.6        83       863        97
VIS    2025250    200200   23.0400  151.7800       7.5        98       990        96
VIS    2025250    200200   23.0200  151.5300       6.2        85       950        96
VIS    2025250    200200   23.0300  151.5100       6.4        87       950        97
VIS    2025250    200200   23.0300  151.4900       6.0        84       935        92
VIS    2025250    200200   23.0400  151.4300       5.8        83       871        93
VIS    2025250    200200   22.9900  150.1500      10.3       116       923        90
VIS    2025250    200200   23.0000  150.1400      10.5       114       923        90
VIS    2025250    200200   23.0000  150.0600       9.8       104       934        91
VIS    2025250    200200   22.9900  150.0600       9.4       102       891        99
VIS    2025250    200200   23.0000  150.0200       9.6        97       891        97
VIS    2025250    200200   23.0100  149.9900       8.5        92       898        95
VIS    2025250    200200   23.0100  149.9800       8.0        93       891        94
VIS    2025250    200200   22.9900  149.9500       7.9       100       865        94
VIS    2025250    200200   23.0000  149.9100       8.9       115       865        98
VIS    2025250    200200   22.9900  149.8900       8.4       115       868        99
VIS    2025250    200200   22.9900  149.8700       8.0       113       895        97
VIS    2025250    200200   23.0100  149.8400       7.2       108       926        92
VIS    2025250    200200   23.0000  149.7300       6.8       107       941        90
VIS    2025250    200200   23.0100  149.6900       6.5       106       899        92
VIS    2025250    200200   22.9900  149.6600       6.9       104       902        94
VIS    2025250    200200   23.0000  149.6400       7.7       107       881        98
VIS    2025250    200200   22.9800  149.6200       7.8       106       887        97
VIS    2025250    200200   22.9900  148.7000       8.4       101       982        92
VIS    2025250    200200   22.9700  148.6700       8.8       101       945        96
VIS    2025250    200200   22.9900  148.6500       9.9       101       914        98
VIS    2025250    200200   22.9900  148.6300      10.5       103       898        95
VIS    2025250    200200   22.9900  148.6100      10.8       105       888        91
VIS    2025250    200200   22.9800  148.5700      10.3       100       878        94
VIS    2025250    200200   22.9700  148.5600      10.0        98       878        95
VIS    2025250    200200   22.9900  148.5300       9.7        96       878        96
VIS    2025250    200200   22.9700  148.5100       8.8        93       879        98
VIS    2025250    200200   22.9800  148.4900       8.2        93       881        98
VIS    2025250    200200   22.9800  148.4600       8.2        99       893        91
VIS    2025250    200200   22.9900  148.4400       8.8       102       893        95
VIS    2025250    200200   22.9800  148.4100       9.9       103       906        94
VIS    2025250    200200   22.9700  148.3700       9.4       100       936        99
VIS    2025250    200200   22.9700  148.3400       9.5       101       896        95
VIS    2025250    200200   22.9900  148.3300       9.4       103       896        96
VIS    2025250    200200   22.9800  148.2900       9.0        95       885        97
VIS    2025250    200200   22.9800  148.2800       8.8        94       885        97
VIS    2025250    200200   22.9800  148.2500       8.5        92       875        97
VIS    2025250    200200   22.9900  148.2100       9.1        91       814        93
VIS    2025250    200200   22.9800  148.2000       9.3        90       812        92
VIS    2025250    200200   22.9800  148.1600       9.5        89       806        90
VIS    2025250    200200   22.9600  148.1300       9.1        89       804        91
VIS    2025250    200200   22.9800  148.1300       9.0        86       804        90
VIS    2025250    200200   22.9600  148.0600       8.9        90       806        93
VIS    2025250    200200   22.9700  148.0300       8.7        89       806        92
VIS    2025250    200200   22.9700  148.0100       8.9        96       815        94
VIS    2025250    200200   22.9800  148.0000       8.7        97       820        94
VIS    2025250    200200   22.9700  147.9600       8.0        95       831        97
VIS    2025250    200200   22.9700  147.9500       7.6        92       845        97
VIS    2025250    200200   22.9800  147.9300       7.5        86       872        97
VIS    2025250    200200   22.9700  147.9000       7.7        83       921        97
VIS    2025250    200200   22.9500  146.7700      11.0        93       983        99
VIS    2025250    200200   22.9600  146.7500      11.2        89       974        99
VIS    2025250    200200   22.9600  146.7200      11.4        86       930        99
VIS    2025250    200200   22.9700  146.6900      11.1        85       918        99
VIS    2025250    200200   22.9600  146.6700      10.9        89       915        99
VIS    2025250    200200   22.9600  146.6500      10.6        93       915        99
VIS    2025250    200200   22.9700  146.6300      10.4        91       915        99
VIS    2025250    200200   22.9400  146.5800       9.5        89       915        99
VIS    2025250    200200   22.9500  146.5600       9.4        89       915        99
VIS    2025250    200200   22.9500  146.5400       9.5        88       916        99
VIS    2025250    200200   22.9600  146.5300      10.0        91       916        98
VIS    2025250    200200   22.9500  146.4800       9.9        91       919        99
VIS    2025250    200200   22.9500  146.4800       9.8        91       919        99
VIS    2025250    200200   22.9400  146.0300       9.3        85       991        95
VIS    2025250    200200   22.9400  146.0200       9.6        86       991        95
VIS    2025250    200200   22.9600  145.9800      11.9        90       996        97
VIS    2025250    200200   22.9600  145.9600      12.1        89       974        98
VIS    2025250    200200   22.9500  145.9500      11.9        88       974        99
VIS    2025250    200200   22.9400  145.9000      11.1        93       975        99
VIS    2025250    200200   22.9500  145.8800      11.1        94       966        99
VIS    2025250    200200   22.9300  144.7300      10.4        87       992        98
VIS    2025250    200200   22.9200  143.6800      10.4        89       993        96
VIS    2025250    200200   22.9100  143.6600      10.3        90       993        96
VIS    2025250    200200   22.9100  143.6200      10.7        93       976        99
VIS    2025250    200200   22.9100  143.6100      10.6        93       976        99
VIS    2025250    200200   22.9100  143.5900       9.8        94       965        99
VIS    2025250    200200   22.9300  143.5500       9.1        90       982        98
VIS    2025250    200200   22.9300  143.5200       9.2        90       984        97
VIS    2025250    200200   22.9300  143.4900      10.2        95       973        99
VIS    2025250    200200   22.9300  143.4700      11.0        96       973       100
VIS    2025250    200200   22.9200  142.8300      10.8        86       994        93
VIS    2025250    200200   22.9100  142.8000      10.9        90       994        99
VIS    2025250    200200   22.9200  142.7900      10.7        90       978       100
VIS    2025250    200200   22.9100  142.7600      10.7        90       963        99
VIS    2025250    200200   22.9200  142.7300      10.3        91       936       100
VIS    2025250    200200   22.9100  142.7100      10.4        93       959        99
VIS    2025250    200200   22.9200  142.6900      10.8        93       941        99
VIS    2025250    200200   22.9300  142.6700      11.1        93       936        99
VIS    2025250    200200   22.9200  142.6400      10.7        93       928        99
VIS    2025250    200200   22.9300  142.6200      10.3        93       928        99
VIS    2025250    200200   22.9300  142.6000      10.1        94       926        99
VIS    2025250    200200   22.9200  142.5700       9.7        92       934       100
VIS    2025250    200200   22.9100  142.5400       9.1        89       940        99
VIS    2025250    200200   22.9100  142.5000       9.2        92       978        99
VIS    2025250    200200   22.9100  142.4900       9.4        93       978        99
VIS    2025250    200200   22.9200  142.4700       9.9        94       962       100
VIS    2025250    200200   23.0200  152.1800       8.5        86       901        90
VIS    2025250    200200   23.0100  152.0300       7.4        83       862        95
VIS    2025250    200200   23.0100  152.0000       6.6        88       862        99
VIS    2025250    200200   23.0100  152.0000       6.1        87       860        94
VIS    2025250    200200   23.0100  151.7800       7.8        99       990        95
VIS    2025250    200200   23.0200  151.7800       7.7        98       990        96
VIS    2025250    200200   23.0000  151.5500       6.2        99       992        99
VIS    2025250    200200   22.9900  151.5400       6.1        94       992        97
VIS    2025250    200200   23.0100  151.5100       6.4        83       916        97
VIS    2025250    200200   22.9700  150.1600       9.9       116       926        90
VIS    2025250    200200   22.9900  150.1400      10.5       114       899        95
VIS    2025250    200200   22.9700  150.1200      11.7       117       884        90
VIS    2025250    200200   22.9900  150.0800       9.8       104       933        91
VIS    2025250    200200   22.9900  150.0700       9.4       102       891        99
VIS    2025250    200200   22.9800  150.0300       9.3        91       871        95
VIS    2025250    200200   22.9800  149.9600       7.8        99       864        91
VIS    2025250    200200   22.9800  149.9400       7.9       103       864        97
VIS    2025250    200200   22.9800  149.9100       8.5       115       866        98
VIS    2025250    200200   22.9800  149.8800       8.2       112       870        98
VIS    2025250    200200   22.9800  149.8700       8.0       112       881        97
VIS    2025250    200200   22.9700  149.8200       7.4       107       926        92
VIS    2025250    200200   22.9800  149.6900       6.6       102       917        96
VIS    2025250    200200   22.9600  149.6700       7.2       104       930        99
VIS    2025250    200200   22.9600  149.6500       7.0       108       881        98
VIS    2025250    200200   22.9700  149.6300       7.3       108       881        97
VIS    2025250    200200   22.9500  148.7700       9.8        92       995        98
VIS    2025250    200200   22.9500  148.7500       9.7        96       993        98
VIS    2025250    200200   22.9500  148.7400       9.7        98       993        99
VIS    2025250    200200   22.9500  148.6700       9.3        99       928        99
VIS    2025250    200200   22.9700  148.6700       8.9       101       928        98
VIS    2025250    200200   22.9700  148.6200      10.3       100       890        95
VIS    2025250    200200   22.9400  148.5900      10.1        95       878        93
VIS    2025250    200200   22.9500  148.5900      10.0        94       878        94
VIS    2025250    200200   22.9500  148.5500       9.4        96       878        96
VIS    2025250    200200   22.9600  148.5400       9.4        97       878        97
VIS    2025250    200200   22.9600  148.5100       8.7        93       879        98
VIS    2025250    200200   22.9500  148.4800       8.7        95       888        94
VIS    2025250    200200   22.9600  148.4600       8.8        99       906        91
VIS    2025250    200200   22.9400  148.4100       9.3       105       938        97
VIS    2025250    200200   22.9400  148.3900       8.7       100       936        99
VIS    2025250    200200   22.9400  148.3800       8.7        98       916       100
VIS    2025250    200200   22.9600  148.3500       9.2        98       908        97
VIS    2025250    200200   22.9600  148.3300       9.6       100       893        94
VIS    2025250    200200   22.9400  148.2900       9.2        93       885        97
VIS    2025250    200200   22.9400  148.2700       9.0        91       876        95
VIS    2025250    200200   22.9500  148.2300       8.9        96       801        94
VIS    2025250    200200   22.9500  148.2100       8.5        94       796        93
VIS    2025250    200200   22.9400  148.1300       9.0        90       801        92
VIS    2025250    200200   22.9400  148.0800       8.9        92       801        93
VIS    2025250    200200   22.9400  148.0500       8.8        94       806        94
VIS    2025250    200200   22.9500  148.0300       8.8        91       806        93
VIS    2025250    200200   22.9500  148.0100       9.0        95       806        94
VIS    2025250    200200   22.9600  147.9900       8.9        99       818        96
VIS    2025250    200200   22.9400  147.9600       8.5        97       820        97
VIS    2025250    200200   22.9500  147.9500       8.0        94       840        98
VIS    2025250    200200   22.9300  147.9200       8.2        89       893        97
VIS    2025250    200200   22.9500  147.8800       8.1        81       926        93
VIS    2025250    200200   22.9200  146.8900      10.5        86       985        99
VIS    2025250    200200   22.9200  146.8700      10.4        89       994       100
VIS    2025250    200200   22.9400  146.7500      11.2        93       980        99
VIS    2025250    200200   22.9300  146.7300      11.0        93       974        99
VIS    2025250    200200   22.9400  146.7000      10.9        89       930       100
VIS    2025250    200200   22.9200  146.6800      10.2        90       930        99
VIS    2025250    200200   22.9300  146.6600      10.5        92       924        98
VIS    2025250    200200   22.9400  146.6400      10.4        93       916        99
VIS    2025250    200200   22.9200  146.5800       9.2        90       918        97
VIS    2025250    200200   22.9300  146.5500       9.1        86       916        98
VIS    2025250    200200   22.9300  146.5400       9.2        85       919        98
VIS    2025250    200200   22.9200  146.0200      10.3        88       961        99
VIS    2025250    200200   22.9100  145.9800      11.3        84       968        98
VIS    2025250    200200   22.9200  145.9300      11.2        88       975        99
VIS    2025250    200200   22.9300  145.9000      11.1        92       976        99
VIS    2025250    200200   22.9300  145.8700      11.0        90       966        95
VIS    2025250    200200   22.9000  143.6600      10.2        90       993        97
VIS    2025250    200200   22.8900  143.6300      10.8        91       973        99
VIS    2025250    200200   22.9100  143.6100      10.7        92       973        99
VIS    2025250    200200   22.9100  143.5900      10.1        93       965        99
VIS    2025250    200200   22.9000  143.5500       9.5        92       936        99
VIS    2025250    200200   22.8900  143.5200      10.4        93       936        98
VIS    2025250    200200   22.8900  143.5000      10.9        94       936        99
VIS    2025250    200200   22.9000  142.7200      10.4        94       959        98
VIS    2025250    200200   22.9000  142.6900      10.6        92       941        99
VIS    2025250    200200   22.9000  142.6800      10.6        92       941        99
VIS    2025250    200200   22.8900  142.6500      10.9        93       922        99
VIS    2025250    200200   22.8800  142.6100      10.0        96       921        98
VIS    2025250    200200   22.8900  142.5900       9.7        94       919        99
VIS    2025250    200200   22.8900  142.5700       9.5        93       918       100
VIS    2025250    200200   22.8900  142.5600       9.4        93       918       100
VIS    2025250    200200   22.8800  142.5200       9.3        92       926        99
VIS    2025250    200200   22.9000  142.4900       9.4        93       978        99
VIS    2025250    200200   22.9000  142.4800       9.4        93       978        99
VIS    2025250    200200   22.8900  142.4500       9.7        93       954        99
VIS    2025250    200200   23.0000  152.2100       8.3        86       931        90
VIS    2025250    200200   22.9900  152.1800       7.8        89       924        93
VIS    2025250    200200   22.9900  152.1700       8.0        89       911        91
VIS    2025250    200200   22.9900  152.0400       7.9        83       863        91
VIS    2025250    200200   22.9800  152.0100       6.6        82       860        97
VIS    2025250    200200   22.9900  151.9800       5.8        86       858        94
VIS    2025250    200200   22.9800  151.9400       5.5        82       864        91
VIS    2025250    200200   22.9800  151.7700       7.8        97       983        95
VIS    2025250    200200   22.9800  151.7600       7.7        96       983        96
VIS    2025250    200200   22.9700  151.7300       6.9        88       983        95
VIS    2025250    200200   22.9700  151.6700       6.0        76       961        92
VIS    2025250    200200   22.9700  151.6600       6.0        80       959        93
VIS    2025250    200200   22.9600  150.1600       9.7       115       926        91
VIS    2025250    200200   22.9600  150.1600       9.7       114       911        95
VIS    2025250    200200   22.9600  150.1200      11.9       118       884        90
VIS    2025250    200200   22.9600  150.1000      11.4       115       883        93
VIS    2025250    200200   22.9600  150.0800      10.4       112       879        95
VIS    2025250    200200   22.9400  150.0300       9.3       101       868        96
VIS    2025250    200200   22.9600  150.0300       9.2        95       871        94
VIS    2025250    200200   22.9400  150.0000       8.3       100       864        94
VIS    2025250    200200   22.9500  149.9600       8.3       101       864        93
VIS    2025250    200200   22.9400  149.9300       8.3       104       865        99
VIS    2025250    200200   22.9400  149.9100       8.1       103       866        99
VIS    2025250    200200   22.9500  149.8800       8.0       113       868        99
VIS    2025250    200200   22.9500  149.8700       8.0       115       868        99
VIS    2025250    200200   22.9400  149.8300       7.5       115       904        96
VIS    2025250    200200   22.9600  149.8200       7.4       112       926        95
VIS    2025250    200200   22.9400  149.6800       8.2       103       930       100
VIS    2025250    200200   22.9500  149.6700       7.4       104       930        99
VIS    2025250    200200   22.9500  149.6400       7.5       111       866        98
VIS    2025250    200200   22.9500  149.6200       7.2       108       887        92
VIS    2025250    200200   22.9200  148.7700       9.9        95       972        99
VIS    2025250    200200   22.9300  148.7600       9.9        94       984        99
VIS    2025250    200200   22.9200  148.7200       9.6        99       958        99
VIS    2025250    200200   22.9200  148.7100       9.5        99       954        99
VIS    2025250    200200   22.9200  148.6800      10.0        98       916        98
VIS    2025250    200200   22.9200  148.6400      10.7        97       892        94
VIS    2025250    200200   22.9300  148.6300      10.6        98       892        94
VIS    2025250    200200   22.9300  148.6100      10.6        96       880        92
VIS    2025250    200200   22.9400  148.5900       9.8        94       878        94
VIS    2025250    200200   22.9300  148.5400       9.0        94       877        97
VIS    2025250    200200   22.9300  148.5100       8.6        91       878        97
VIS    2025250    200200   22.9400  148.5100       8.7        92       878        97
VIS    2025250    200200   22.9300  148.4600       9.4       101       915        94
VIS    2025250    200200   22.9200  148.4200       8.6       104       941        98
VIS    2025250    200200   22.9400  148.3900       8.5       100       916       100
VIS    2025250    200200   22.9200  148.3600       8.6        91       892        98
VIS    2025250    200200   22.9400  148.3600       9.1        96       903        98
VIS    2025250    200200   22.9200  148.3200      10.0        98       886        95
VIS    2025250    200200   22.9100  148.2800       9.2        93       876        95
VIS    2025250    200200   22.9200  148.2800       9.2        92       876        95
VIS    2025250    200200   22.9200  148.2500       8.8        94       872        96
VIS    2025250    200200   22.9200  148.2100       8.3        95       795        94
VIS    2025250    200200   22.9200  148.1100       8.9        90       800        91
VIS    2025250    200200   22.9100  148.0800       9.1        94       809        94
VIS    2025250    200200   22.9100  148.0700       9.1        95       815        94
VIS    2025250    200200   22.9200  148.0400       8.8        95       812        95
VIS    2025250    200200   22.9200  148.0100       8.8        96       811        95
VIS    2025250    200200   22.9200  147.9800       8.8        96       810        95
VIS    2025250    200200   22.9300  147.9600       8.6        97       821        97
VIS    2025250    200200   22.9200  147.9400       8.3        95       840        97
VIS    2025250    200200   22.9200  147.9100       8.2        90       903        97
VIS    2025250    200200   22.9300  147.8900       8.3        87       936        95
VIS    2025250    200200   22.9000  146.9300       9.7        88       987        99
VIS    2025250    200200   22.9000  146.9200       9.7        86       974       100
VIS    2025250    200200   22.9200  146.9000      10.3        84       974        98
VIS    2025250    200200   22.9000  146.8700       9.8        86       940        99
VIS    2025250    200200   22.9000  146.8400      10.6        86       957        99
VIS    2025250    200200   22.9000  146.8300      11.0        85       957        99
VIS    2025250    200200   22.8900  146.8000      11.2        86       998        96
VIS    2025250    200200   22.9000  146.7600      11.1        95       984        98
VIS    2025250    200200   22.9000  146.7300      10.8        93       980        99
VIS    2025250    200200   22.9000  146.7100      10.5        90       967       100
VIS    2025250    200200   22.9100  146.6800      10.1        90       934        99
VIS    2025250    200200   22.9100  146.6800      10.2        90       934        99
VIS    2025250    200200   22.9100  146.5700       9.1        88       924        93
VIS    2025250    200200   22.8900  146.0100      10.8        87       968        99
VIS    2025250    200200   22.9100  146.0000      10.9        85       961        98
VIS    2025250    200200   22.9100  145.9700      11.2        84       968        99
VIS    2025250    200200   22.8600  143.7300      11.3        97       988        99
VIS    2025250    200200   22.8700  143.7000      11.3        95       984        96
VIS    2025250    200200   22.8700  143.6600      10.9        96       975        99
VIS    2025250    200200   22.8700  143.6400      11.2        94       963       100
VIS    2025250    200200   22.8700  143.6100      11.0        92       937       100
VIS    2025250    200200   22.8700  143.5900      10.4        92       935       100
VIS    2025250    200200   22.8800  143.5600       9.9        93       935        99
VIS    2025250    200200   22.8700  143.5400      10.4        91       932       100
VIS    2025250    200200   22.8700  143.5200      10.6        92       932       100
VIS    2025250    200200   22.8800  143.4800      11.5        95       931        99
VIS    2025250    200200   22.8800  142.7200      10.3        95       960        91
VIS    2025250    200200   22.8800  142.6900      10.6        90       959        99
VIS    2025250    200200   22.8700  142.6600      10.6        90       933       100
VIS    2025250    200200   22.8600  142.6300      10.2        94       923        99
VIS    2025250    200200   22.8600  142.6300      10.1        94       922        99
VIS    2025250    200200   22.8600  142.5900       9.5        96       918        96
VIS    2025250    200200   22.8700  142.5600       9.6        96       918        98
VIS    2025250    200200   22.8700  142.5500       9.6        95       918        99
VIS    2025250    200200   22.8800  142.5100       9.3        93       928        99
VIS    2025250    200200   22.8500  142.5000       9.5        93       929        99
VIS    2025250    200200   22.8700  142.4700       9.6        93       978        98
VIS    2025250    200200   22.8700  142.4500       9.7        92       959        97
VIS    2025250    200200   22.9600  152.2000       7.4        90       967        93
VIS    2025250    200200   22.9500  152.1800       8.2        90       973        91
VIS    2025250    200200   22.9600  152.1500       8.1        87       951        92
VIS    2025250    200200   22.9500  152.1200       7.9        82       915        92
VIS    2025250    200200   22.9500  152.0400       7.2        78       885        93
VIS    2025250    200200   22.9500  152.0300       7.1        77       885        93
VIS    2025250    200200   22.9600  152.0000       6.5        75       860        95
VIS    2025250    200200   22.9600  151.7500       7.6        92       983        94
VIS    2025250    200200   22.9600  151.7400       7.2        92       983        92
VIS    2025250    200200   22.9500  151.6600       6.0        76       908        92
VIS    2025250    200200   22.9600  151.6600       6.0        77       909        93
VIS    2025250    200200   22.9300  150.1700       9.6       112       907        96
VIS    2025250    200200   22.9400  150.1500       9.9       113       894        97
VIS    2025250    200200   22.9300  150.1000      11.4       114       876        92
VIS    2025250    200200   22.9300  150.1000      11.0       112       876        94
VIS    2025250    200200   22.9400  150.0700       9.9       107       878        98
VIS    2025250    200200   22.9100  150.0300       9.6       107       868        99
VIS    2025250    200200   22.9300  150.0100       9.3       105       867        97
VIS    2025250    200200   22.9200  149.9900       8.9       105       863        99
VIS    2025250    200200   22.9200  149.9500       8.6       104       860        97
VIS    2025250    200200   22.9200  149.9400       8.6       104       861        98
VIS    2025250    200200   22.9300  149.9100       8.3       103       866        99
VIS    2025250    200200   22.9300  149.8800       8.3       108       865       100
VIS    2025250    200200   22.9200  149.8600       8.1       107       866       100
VIS    2025250    200200   22.9100  149.8300       7.8       115       904        97
VIS    2025250    200200   22.9200  149.8000       8.2       116       910        96
VIS    2025250    200200   22.9100  149.7400       8.2       110       996        98
VIS    2025250    200200   22.9100  149.7200       8.2       107       991        99
VIS    2025250    200200   22.8900  148.7700       9.7        97       972       100
VIS    2025250    200200   22.9100  148.7500       9.7        96       972        99
VIS    2025250    200200   22.9100  148.7200       9.6        99       954        99
VIS    2025250    200200   22.9000  148.7000       9.9       100       916        98
VIS    2025250    200200   22.9000  148.6600      10.5        97       891        94
VIS    2025250    200200   22.9100  148.6600      10.4        96       892        95
VIS    2025250    200200   22.9000  148.6100      10.7        95       877        92
VIS    2025250    200200   22.9100  148.6100      10.6        96       877        92
VIS    2025250    200200   22.8900  148.5600       9.0        91       878        97
VIS    2025250    200200   22.8900  148.5600       8.8        91       880        97
VIS    2025250    200200   22.9100  148.5200       8.3        90       880        95
VIS    2025250    200200   22.9100  148.5000       7.9        95       899        91
VIS    2025250    200200   22.9000  148.4700       9.1       109       916        93
VIS    2025250    200200   22.9000  148.4400       9.3       104       942        98
VIS    2025250    200200   22.9000  148.4100       8.2       100       916        99
VIS    2025250    200200   22.8900  148.3800       7.9        89       897        98
VIS    2025250    200200   22.9000  148.3600       8.5        89       891        98
VIS    2025250    200200   22.8900  148.3400       9.2        93       882        97
VIS    2025250    200200   22.8900  148.3000       9.1        93       876        96
VIS    2025250    200200   22.9100  148.2900       9.1        93       876        95
VIS    2025250    200200   22.8900  148.2700       9.1        92       873        93
VIS    2025250    200200   22.8900  148.2500       8.7        90       872        95
VIS    2025250    200200   22.8900  148.2100       8.7        94       795        92
VIS    2025250    200200   22.8900  148.1900       9.0        96       795        93
VIS    2025250    200200   22.8900  148.1700       8.7        94       795        92
VIS    2025250    200200   22.9000  148.1300       8.9        87       794        90
VIS    2025250    200200   22.9000  148.1100       8.9        90       800        92
VIS    2025250    200200   22.9100  148.0800       9.0        95       815        94
VIS    2025250    200200   22.8900  148.0500       8.8        98       815        94
VIS    2025250    200200   22.8900  148.0300       8.7        98       815        95
VIS    2025250    200200   22.9100  148.0200       8.5        97       812        94
VIS    2025250    200200   22.9000  147.9800       8.6        93       812        94
VIS    2025250    200200   22.9000  147.9500       8.3        90       831        95
VIS    2025250    200200   22.9000  147.9400       8.2        90       833        96
VIS    2025250    200200   22.9000  147.9100       8.1        88       903        97
VIS    2025250    200200   22.9000  147.8900       8.4        88       936        96
VIS    2025250    200200   22.8900  147.8500       9.2        84       971        99
VIS    2025250    200200   22.8700  146.9800       8.9        89       993        98
VIS    2025250    200200   22.8700  146.9700       9.2        89       987        99
VIS    2025250    200200   22.8700  146.9300       9.7        90       972        99
VIS    2025250    200200   22.8700  146.9100       9.7        88       943        99
VIS    2025250    200200   22.8700  146.9000       9.8        87       939        99
VIS    2025250    200200   22.8700  146.8800       9.7        87       939        98
VIS    2025250    200200   22.8900  146.8400      10.5        86       957        99
VIS    2025250    200200   22.8800  146.8100      10.9        85       996        98
VIS    2025250    200200   22.8700  146.7000      10.7        88       966       100
VIS    2025250    200200   22.8900  146.6800      10.3        89       938        99
VIS    2025250    200200   22.8700  146.0800      11.7        88       999        99
VIS    2025250    200200   22.8600  146.0500      11.5        88       996        99
VIS    2025250    200200   22.8700  146.0200      11.2        91       992        99
VIS    2025250    200200   22.8600  146.0100      11.1        91       992        99
VIS    2025250    200200   22.8600  145.9700      10.5        90       965        99
VIS    2025250    200200   22.8600  143.7300      11.3        96       988        99
VIS    2025250    200200   22.8400  143.6800      11.7        97       979        99
VIS    2025250    200200   22.8600  143.6700      11.0        97       975        99
VIS    2025250    200200   22.8400  143.6300      11.6        95       951        99
VIS    2025250    200200   22.8400  143.6200      11.7        94       931        99
VIS    2025250    200200   22.8400  143.5900      10.8        92       929       100
VIS    2025250    200200   22.8400  143.5800      10.7        92       930       100
VIS    2025250    200200   22.8500  143.5500      10.6        89       930       100
VIS    2025250    200200   22.8600  143.5100      11.1        90       927        98
VIS    2025250    200200   22.8600  143.5000      11.2        91       928        98
VIS    2025250    200200   22.8300  143.0000      11.1        94       995        99
VIS    2025250    200200   22.8400  142.9500      10.9        90       996        98
VIS    2025250    200200   22.8300  142.9100      10.8        91       996        99
VIS    2025250    200200   22.8500  142.7100      10.5        90       989       100
VIS    2025250    200200   22.8300  142.6800      10.6        95       953       100
VIS    2025250    200200   22.8300  142.6700      10.4        94       937       100
VIS    2025250    200200   22.8300  142.6400       9.7        93       924        99
VIS    2025250    200200   22.8500  142.6100       9.7        95       921        98
VIS    2025250    200200   22.8400  142.5900       9.5        96       920        97
VIS    2025250    200200   22.8300  142.5700      10.2        98       918        96
VIS    2025250    200200   22.8500  142.5400      10.4        95       920        98
VIS    2025250    200200   22.8300  142.5200      10.3        93       926        99
VIS    2025250    200200   22.9200  152.1500       8.3        87       937        92
VIS    2025250    200200   22.9200  152.1100       7.7        83       909        94
VIS    2025250    200200   22.9300  152.1100       7.8        82       907        93
VIS    2025250    200200   22.9400  152.0600       7.6        82       887        93
VIS    2025250    200200   22.9400  152.0500       7.3        80       885        94
VIS    2025250    200200   22.9200  152.0100       6.7        74       871        90
VIS    2025250    200200   22.9400  152.0000       6.5        71       867        92
VIS    2025250    200200   22.9300  151.6900       6.3        69       909        90
VIS    2025250    200200   22.9200  151.6700       6.2        75       880        91
VIS    2025250    200200   22.9100  150.1700       9.4       109       903        97
VIS    2025250    200200   22.8900  150.1300       9.1       103       879        98
VIS    2025250    200200   22.8900  150.1100       9.3       104       876        99
VIS    2025250    200200   22.9000  150.0900       9.6       104       874        98
VIS    2025250    200200   22.8900  150.0700       9.3       103       874        98
VIS    2025250    200200   22.9100  150.0300       9.6       107       867        98
VIS    2025250    200200   22.8900  150.0200       9.9       107       864        98
VIS    2025250    200200   22.9000  149.9800       8.8       105       859        99
VIS    2025250    200200   22.9000  149.9700       8.6       106       859        99
VIS    2025250    200200   22.9100  149.9400       8.6       104       859        98
VIS    2025250    200200   22.8900  149.9100       8.3       100       862        98
VIS    2025250    200200   22.8900  149.8700       8.2        95       869        91
VIS    2025250    200200   22.9000  149.8500       7.8       108       879        96
VIS    2025250    200200   22.9100  149.8000       8.3       114       921        95
VIS    2025250    200200   22.8800  148.8600      11.7       104       979        93
VIS    2025250    200200   22.8900  148.8400       9.5        98       986        93
VIS    2025250    200200   22.8800  148.8100       9.1        95       986        97
VIS    2025250    200200   22.8700  148.7900       9.4        98       946       100
VIS    2025250    200200   22.8700  148.7600       9.7        99       906        98
VIS    2025250    200200   22.8700  148.7300       9.7        97       906        98
VIS    2025250    200200   22.8700  148.7200       9.7        96       894        97
VIS    2025250    200200   22.8800  148.6800      10.4       100       885        94
VIS    2025250    200200   22.8700  148.6600      10.5        96       877        94
VIS    2025250    200200   22.8900  148.6300      10.6        93       877        93
VIS    2025250    200200   22.8900  148.6100      10.2        94       877        94
VIS    2025250    200200   22.8900  148.5900       9.7        95       877        96
VIS    2025250    200200   22.8800  148.5600       8.7        91       878        97
VIS    2025250    200200   22.8800  148.5400       8.1        88       899        97
VIS    2025250    200200   22.8700  148.5100       9.5       101       913        91
VIS    2025250    200200   22.8700  148.4900       9.8       106       904        90
VIS    2025250    200200   22.8700  148.4500       9.0       100       916        99
VIS    2025250    200200   22.8600  148.4300       9.0        96       905        99
VIS    2025250    200200   22.8800  148.4100       8.4        92       907        99
VIS    2025250    200200   22.8800  148.3800       8.0        87       891        97
VIS    2025250    200200   22.8700  148.3400       8.9        89       877        96
VIS    2025250    200200   22.8600  148.3300       8.5        89       875        97
VIS    2025250    200200   22.8700  148.3100       8.7        90       875        96
VIS    2025250    200200   22.8700  148.2700       9.3        87       873        93
VIS    2025250    200200   22.8700  148.2600       9.3        87       873        93
VIS    2025250    200200   22.8700  148.2300       9.3        91       796        90
VIS    2025250    200200   22.8800  148.2100       8.7        94       794        92
VIS    2025250    200200   22.8600  148.1700       8.4        95       795        94
VIS    2025250    200200   22.8600  148.1600       8.1        90       796        92
VIS    2025250    200200   22.8800  148.1200       8.5        83       796        90
VIS    2025250    200200   22.8600  148.0900       8.8        88       803        92
VIS    2025250    200200   22.8600  148.0600       8.8        90       821        94
VIS    2025250    200200   22.8700  148.0600       8.9        95       815        93
VIS    2025250    200200   22.8800  148.0100       8.3        95       821        96
VIS    2025250    200200   22.8600  147.9900       8.2        89       836        95
VIS    2025250    200200   22.8600  147.9700       8.1        89       840        93
VIS    2025250    200200   22.8700  147.9400       8.3        85       840        91
VIS    2025250    200200   22.8700  147.9300       8.2        84       840        92
VIS    2025250    200200   22.8700  147.8900       8.3        85       889        96
VIS    2025250    200200   22.8800  147.8600       8.8        83       958        98
VIS    2025250    200200   22.8600  146.9700       9.3        89       988        99
VIS    2025250    200200   22.8600  146.9700       9.3        89       987        99
VIS    2025250    200200   22.8700  146.9300       9.8        90       972        99
VIS    2025250    200200   22.8700  146.9100       9.7        88       943        99
VIS    2025250    200200   22.8500  146.8800       9.9        90       943        98
VIS    2025250    200200   22.8600  146.8400       9.4        89       940        98
VIS    2025250    200200   22.8600  146.7500      11.0        88       983       100
VIS    2025250    200200   22.8600  146.6900      10.6        86       946        98
VIS    2025250    200200   22.8400  146.1500      11.4        82       979        97
VIS    2025250    200200   22.8400  146.1400      11.3        86       979       100
VIS    2025250    200200   22.8400  146.1000      11.2        92       980        97
VIS    2025250    200200   22.8400  146.0700      11.3        90       996        99
VIS    2025250    200200   22.8500  146.0600      11.4        89       996        99
VIS    2025250    200200   22.8300  146.0300      11.4        90       990       100
VIS    2025250    200200   22.8400  146.0100      11.2        92       989        99
VIS    2025250    200200   22.8500  145.9700      10.5        91       965        99
VIS    2025250    200200   22.8200  143.7600      10.6        98       999        98
VIS    2025250    200200   22.8300  143.7400      11.0        97       982        98
VIS    2025250    200200   22.8100  143.7100      11.8        96       976        96
VIS    2025250    200200   22.8200  143.7000      12.1        98       983        97
VIS    2025250    200200   22.8100  143.6700      11.8        96       971        98
VIS    2025250    200200   22.8200  143.6400      11.8        96       938        99
VIS    2025250    200200   22.8100  143.6300      11.7        96       929        99
VIS    2025250    200200   22.8200  143.5900      11.2        93       920       100
VIS    2025250    200200   22.8200  143.5800      11.0        92       920       100
VIS    2025250    200200   22.8100  143.5400      11.0        90       921        99
VIS    2025250    200200   22.8100  143.5300      11.1        90       921        98
VIS    2025250    200200   22.8200  143.5100      11.5        89       927        95
VIS    2025250    200200   22.8200  143.0100      11.3        95       980        99
VIS    2025250    200200   22.8200  142.9800      11.0        92       994       100
VIS    2025250    200200   22.8100  142.9700      11.0        91       980       100
VIS    2025250    200200   22.8200  142.9300      10.9        91       996        99
VIS    2025250    200200   22.8100  142.8500      10.9        85       998        99
VIS    2025250    200200   22.8100  142.8300      11.1        86       998        98
VIS    2025250    200200   22.8100  142.7900      10.1        90       986       100
VIS    2025250    200200   22.8200  142.7500      10.4        91       991        97
VIS    2025250    200200   22.8000  142.7200      10.4        93       991        99
VIS    2025250    200200   22.8100  142.7000      10.5        95       974       100
VIS    2025250    200200   22.8000  142.6900      10.4        94       957       100
VIS    2025250    200200   22.8200  142.6500       9.9        93       925        99
VIS    2025250    200200   22.8200  142.6300       9.6        93       923        99
VIS    2025250    200200   22.8000  142.6100       9.6        92       922        99
VIS    2025250    200200   22.8200  142.6000       9.6        95       920        98
VIS    2025250    200200   22.8100  142.5700      10.3        99       921        96
VIS    2025250    200200   22.8100  142.5500      10.5        99       921        98
VIS    2025250    200200   22.8000  142.5100      10.2        93       929       100
VIS    2025250    200200   22.9200  152.1600       8.6        89       951        91
VIS    2025250    200200   22.9100  152.1500       8.4        88       937        91
VIS    2025250    200200   22.9200  152.1100       7.6        84       909        94
VIS    2025250    200200   22.9200  152.1000       7.7        84       907        94
VIS    2025250    200200   22.9000  152.0600       7.4        85       887        95
VIS    2025250    200200   22.9200  152.0300       6.8        77       881        92
VIS    2025250    200200   22.9100  151.6700       6.9        78       889        95
VIS    2025250    200200   22.8800  150.2000      10.5       116       917        91
VIS    2025250    200200   22.8600  150.1700       9.3       106       898        98
VIS    2025250    200200   22.8800  150.1300       9.2       103       876        98
VIS    2025250    200200   22.8800  150.1200       9.2       102       876        99
VIS    2025250    200200   22.8700  150.1000       9.1       102       874        99
VIS    2025250    200200   22.8600  150.0600       9.2       104       870        99
VIS    2025250    200200   22.8700  150.0400       9.5       105       869        99
VIS    2025250    200200   22.8600  150.0200       9.5       104       864        98
VIS    2025250    200200   22.8700  149.9700       8.0       100       863        98
VIS    2025250    200200   22.8600  149.9500       7.4        97       862        97
VIS    2025250    200200   22.8600  149.9400       7.3        97       862        97
VIS    2025250    200200   22.8600  149.8900       7.5        95       870        96
VIS    2025250    200200   22.8800  149.8700       8.2        93       869        90
VIS    2025250    200200   22.8600  148.8800       9.7        95       985        91
VIS    2025250    200200   22.8500  148.8500      10.1       100       977        97
VIS    2025250    200200   22.8500  148.8200       9.6        97       965        99
VIS    2025250    200200   22.8500  148.8100       9.4        96       946       100
VIS    2025250    200200   22.8600  148.7900       9.3        97       946       100
VIS    2025250    200200   22.8600  148.7600       9.8        99       889        95
VIS    2025250    200200   22.8400  148.7200       9.8        96       885        96
VIS    2025250    200200   22.8500  148.7100       9.8        96       885        96
VIS    2025250    200200   22.8600  148.6800      10.3        98       879        94
VIS    2025250    200200   22.8400  148.6500      10.1        95       876        94
VIS    2025250    200200   22.8500  148.6300      10.0        94       876        94
VIS    2025250    200200   22.8400  148.6100       9.5        96       875        96
VIS    2025250    200200   22.8400  148.5700       7.8        94       878        98
VIS    2025250    200200   22.8600  148.5400       7.8        85       904        95
VIS    2025250    200200   22.8600  148.5300       8.8        92       915        93
VIS    2025250    200200   22.8600  148.5100       9.6        99       913        90
VIS    2025250    200200   22.8400  148.4800      10.6       106       896        91
VIS    2025250    200200   22.8400  148.4400       8.9        96       894        99
VIS    2025250    200200   22.8400  148.4300       8.9        94       896        99
VIS    2025250    200200   22.8500  148.4100       8.9        92       893        97
VIS    2025250    200200   22.8500  148.3600       8.7        85       875        94
VIS    2025250    200200   22.8600  148.3400       8.5        88       875        97
VIS    2025250    200200   22.8600  148.3300       8.4        88       875        97
VIS    2025250    200200   22.8500  148.3100       8.4        88       875        96
VIS    2025250    200200   22.8500  148.2600       9.4        86       873        93
VIS    2025250    200200   22.8500  148.2500       9.8        89       872        93
VIS    2025250    200200   22.8500  148.2300       9.9        93       794        90
VIS    2025250    200200   22.8500  148.1800       8.8        97       796        94
VIS    2025250    200200   22.8500  148.1700       8.7        96       797        94
VIS    2025250    200200   22.8300  148.1400       9.1        85       810        91
VIS    2025250    200200   22.8400  148.1100       8.7        82       821        91
VIS    2025250    200200   22.8500  148.0800       8.7        87       821        93
VIS    2025250    200200   22.8500  148.0600       8.7        87       827        93
VIS    2025250    200200   22.8400  148.0300       8.8        85       840        94
VIS    2025250    200200   22.8300  148.0000       8.5        86       847        94
VIS    2025250    200200   22.8300  148.0000       8.4        86       847        93
VIS    2025250    200200   22.8400  147.9700       8.1        88       842        91
VIS    2025250    200200   22.8300  147.9300       9.0        87       840        94
VIS    2025250    200200   22.8300  147.9200       9.0        87       840        94
VIS    2025250    200200   22.8500  147.8900       8.6        82       863        95
VIS    2025250    200200   22.8300  147.8600       8.8        84       923        98
VIS    2025250    200200   22.8400  147.8400       9.2        84       967        98
VIS    2025250    200200   22.8300  146.9700      10.1        88       974       100
VIS    2025250    200200   22.8100  146.1500      11.8        85       995        97
VIS    2025250    200200   22.8200  146.1300      11.5        88       979        98
VIS    2025250    200200   22.8200  146.0800      11.2        91       981        97
VIS    2025250    200200   22.8100  146.0600      11.1        88       985        98
VIS    2025250    200200   22.8300  146.0300      11.4        89       990       100
VIS    2025250    200200   22.8300  146.0100      11.4        90       982        99
VIS    2025250    200200   22.8100  145.9800      11.5        89       931        98
VIS    2025250    200200   22.8000  144.8200      12.4        90       992        99
VIS    2025250    200200   22.7900  143.7500      12.2        96       989        97
VIS    2025250    200200   22.7900  143.7200      11.7        94       976        99
VIS    2025250    200200   22.7900  143.7000      11.4        93       967        99
VIS    2025250    200200   22.8100  143.6800      11.7        94       971        98
VIS    2025250    200200   22.7900  143.6600      11.5        94       938        99
VIS    2025250    200200   22.8100  143.6300      11.7        96       926        99
VIS    2025250    200200   22.8100  143.6200      11.6        95       920        99
VIS    2025250    200200   22.8100  143.5800      11.1        92       920       100
VIS    2025250    200200   22.8100  143.5500      10.8        91       921        99
VIS    2025250    200200   22.8100  143.5300      11.0        91       921        99
VIS    2025250    200200   22.8000  143.5200      11.0        94       927        99
VIS    2025250    200200   22.7800  143.0500      11.3        93       996        99
VIS    2025250    200200   22.8000  143.0200      11.4        94       982        99
VIS    2025250    200200   22.7800  143.0100      11.3        94       957        99
VIS    2025250    200200   22.7800  142.9700      10.9        92       956       100
VIS    2025250    200200   22.7800  142.9500      10.8        91       963        99
VIS    2025250    200200   22.7900  142.9400      10.8        91       964        99
VIS    2025250    200200   22.7900  142.9000      10.6        92       982       100
VIS    2025250    200200   22.7900  142.8800      10.6        90       966       100
VIS    2025250    200200   22.7800  142.8700      10.7        89       986       100
VIS    2025250    200200   22.7900  142.8200      10.8        88       993        99
VIS    2025250    200200   22.8000  142.8100      10.7        89       986       100
VIS    2025250    200200   22.7800  142.7900      10.5        92       986       100
VIS    2025250    200200   22.7900  142.7500      10.6        91       991        98
VIS    2025250    200200   22.7800  142.7200      10.3        92       967       100
VIS    2025250    200200   22.7900  142.7000      10.1        94       957       100
VIS    2025250    200200   22.8000  142.6900      10.3        94       957       100
VIS    2025250    200200   22.7800  142.6600       9.9        90       926        99
VIS    2025250    200200   22.7800  142.6400       9.9        91       926        99
VIS    2025250    200200   22.7800  142.6000       9.7        93       928        93
VIS    2025250    200200   22.7800  142.5900       9.8        94       928        91
VIS    2025250    200200   22.8000  142.5700      10.3        99       922        96
VIS    2025250    200200   22.7800  142.5300      10.1        96       934        97
VIS    2025250    200200   22.7900  142.5100      10.1        93       933       100
VIS    2025250    200200   22.8800  152.1100       7.7        92       928        95
VIS    2025250    200200   22.8700  152.0800       7.5        96       917        97
VIS    2025250    200200   22.8800  152.0600       7.4        87       889        96
VIS    2025250    200200   22.8800  152.0500       7.5        84       885        93
VIS    2025250    200200   22.8600  150.2100      10.9       118       911        90
VIS    2025250    200200   22.8500  150.1800       9.3       107       891        98
VIS    2025250    200200   22.8500  150.1700       9.1       106       891        98
VIS    2025250    200200   22.8400  150.1400       9.8       106       871        97
VIS    2025250    200200   22.8500  150.1000       9.7       102       871        97
VIS    2025250    200200   22.8500  150.0900       9.2       102       871        99
VIS    2025250    200200   22.8500  150.0600       9.0       103       869        99
VIS    2025250    200200   22.8500  150.0200       9.1       102       866        98
VIS    2025250    200200   22.8600  150.0100       9.1       102       864        98
VIS    2025250    200200   22.8600  149.9700       7.9        99       863        97
VIS    2025250    200200   22.8400  149.9500       7.6        98       868        98
VIS    2025250    200200   22.8300  149.9100       7.1       100       873        98
VIS    2025250    200200   22.8500  149.8900       7.2        97       870        95
VIS    2025250    200200   22.8300  148.9100       9.3        95       985        98
VIS    2025250    200200   22.8300  148.8900       9.2        95       977        98
VIS    2025250    200200   22.8200  148.8600       9.8        98       961        98
VIS    2025250    200200   22.8200  148.8500       9.9        99       961        98
VIS    2025250    200200   22.8300  148.8200       9.9        99       936        99
VIS    2025250    200200   22.8400  148.8000       9.7        97       924        98
VIS    2025250    200200   22.8300  148.7600      10.0        99       885        94
VIS    2025250    200200   22.8300  148.7300       9.6        97       885        96
VIS    2025250    200200   22.8400  148.7100       9.8        97       879        95
VIS    2025250    200200   22.8200  148.6800       9.7        94       876        95
VIS    2025250    200200   22.8200  148.6600       9.9        94       876        95
VIS    2025250    200200   22.8400  148.6400      10.0        95       875        95
VIS    2025250    200200   22.8400  148.6200       9.6        96       875        95
VIS    2025250    200200   22.8100  148.5800       9.0       104       878        98
VIS    2025250    200200   22.8100  148.5500       8.9       107       897        98
VIS    2025250    200200   22.8300  148.5300       8.9        98       915        99
VIS    2025250    200200   22.8200  148.5000      10.8       106       897        94
VIS    2025250    200200   22.8100  148.4800       9.8       107       886        95
VIS    2025250    200200   22.8300  148.4600       9.0       101       893        98
VIS    2025250    200200   22.8200  148.4400       9.1        99       892        98
VIS    2025250    200200   22.8300  148.4200       9.0        97       893        98
VIS    2025250    200200   22.8200  148.3900       9.0        97       876        97
VIS    2025250    200200   22.8300  148.3400       8.4        85       874        94
VIS    2025250    200200   22.8300  148.3400       8.3        86       874        95
VIS    2025250    200200   22.8300  148.3100       8.2        88       873        96
VIS    2025250    200200   22.8300  148.2800       8.0        87       875        97
VIS    2025250    200200   22.8200  148.2600       8.2        91       875        98
VIS    2025250    200200   22.8100  148.2300       8.7        96       793        94
VIS    2025250    200200   22.8300  148.2100       9.3        92       794        92
VIS    2025250    200200   22.8100  148.1800       9.2        91       806        93
VIS    2025250    200200   22.8200  148.1400       9.5        89       824        93
VIS    2025250    200200   22.8100  148.1300       9.6        87       840        93
VIS    2025250    200200   22.8200  148.1000       8.8        86       836        93
VIS    2025250    200200   22.8200  148.0800       8.5        84       840        93
VIS    2025250    200200   22.8200  148.0600       8.5        85       895        96
VIS    2025250    200200   22.8200  148.0300       9.0        86       887        97
VIS    2025250    200200   22.8100  148.0100       9.0        86       861        94
VIS    2025250    200200   22.8100  147.9600       8.4        86       840        93
VIS    2025250    200200   22.8100  147.9500       8.5        87       840        94
VIS    2025250    200200   22.8200  147.9100       9.0        89       840        95
VIS    2025250    200200   22.8300  147.9100       9.0        88       840        94
VIS    2025250    200200   22.8100  147.8700       8.8        85       877        97
VIS    2025250    200200   22.8000  147.8300       9.5        86       956        99
VIS    2025250    200200   22.8300  147.8100       9.9        86       975        99
VIS    2025250    200200   22.8000  147.1300      10.6        86       992       100
VIS    2025250    200200   22.8000  147.1200      10.5        87       995        99
VIS    2025250    200200   22.8000  147.1000       9.0        84       992        96
VIS    2025250    200200   22.8000  146.1500      11.7        85       995        98
VIS    2025250    200200   22.8000  146.0600      11.2        88       985        98
VIS    2025250    200200   22.8000  146.0400      11.6        88       992        97
VIS    2025250    200200   22.8000  145.9800      11.6        86       932        99
VIS    2025250    200200   22.7600  143.8600      12.5        95       999        98
VIS    2025250    200200   22.7600  143.7800      12.0        96       983        98
VIS    2025250    200200   22.7700  143.7800      12.1        96       983        98
VIS    2025250    200200   22.7800  143.7400      12.1        93       973        98
VIS    2025250    200200   22.7700  143.7100      11.2        91       954       100
VIS    2025250    200200   22.7800  143.6900      11.1        92       967       100
VIS    2025250    200200   22.7800  143.6600      11.4        93       926        99
VIS    2025250    200200   22.7700  143.6500      11.5        93       925        98
VIS    2025250    200200   22.7800  143.6100      11.5        92       919        98
VIS    2025250    200200   22.7700  143.5800      11.4        89       918        99
VIS    2025250    200200   22.7700  143.5800      11.4        90       918        99
VIS    2025250    200200   22.7600  143.5500      10.9        90       922       100
VIS    2025250    200200   22.7700  143.5100      10.9        95       930        98
VIS    2025250    200200   22.7600  143.0300      11.2        94       996        99
VIS    2025250    200200   22.7700  143.0000      11.0        94       956        99
VIS    2025250    200200   22.7700  142.9900      10.9        93       955        99
VIS    2025250    200200   22.7700  142.9600      10.8        90       962        99
VIS    2025250    200200   22.7600  142.9400      10.9        91       963        99
VIS    2025250    200200   22.7500  142.9200      10.6        91       967       100
VIS    2025250    200200   22.7500  142.8800      10.5        90       973       100
VIS    2025250    200200   22.7700  142.8700      10.6        90       966       100
VIS    2025250    200200   22.7700  142.8500      11.0        88       994       100
VIS    2025250    200200   22.7600  142.8100      10.9        92       992       100
VIS    2025250    200200   22.7500  142.7800      10.9        93       975       100
VIS    2025250    200200   22.7500  142.7500      10.5        90       948        99
VIS    2025250    200200   22.7600  142.7300      10.3        90       960        99
VIS    2025250    200200   22.7700  142.7100      10.2        92       960        99
VIS    2025250    200200   22.7700  142.6900       9.8        92       953        98
VIS    2025250    200200   22.7500  142.6600      10.0        88       968        97
VIS    2025250    200200   22.7700  142.6500      10.0        89       934        99
VIS    2025250    200200   22.7700  142.6200       9.8        92       928        97
VIS    2025250    200200   22.7700  142.5500      10.0        99       934        92
VIS    2025250    200200   22.7700  142.5300      10.0        97       934        96
VIS    2025250    200200   22.8700  152.0800       7.6        96       922        97
VIS    2025250    200200   22.8400  151.5700       7.5        89       943        95
VIS    2025250    200200   22.8400  151.5600       7.5        90       943        95
VIS    2025250    200200   22.8200  150.2000       9.3       114       878        98
VIS    2025250    200200   22.8300  150.1700       8.9       109       878        99
VIS    2025250    200200   22.8300  150.1700       8.8       108       878        99
VIS    2025250    200200   22.8200  150.1300       9.7       106       870        95
VIS    2025250    200200   22.8300  150.1000       9.9       105       867        96
VIS    2025250    200200   22.8100  150.0800       9.5       104       867        98
VIS    2025250    200200   22.8200  150.0600       9.1       102       866        98
VIS    2025250    200200   22.8300  150.0200       8.6       100       866        98
VIS    2025250    200200   22.8100  150.0100       7.8        99       866        98
VIS    2025250    200200   22.8100  149.9700       8.0        99       870        98
VIS    2025250    200200   22.8100  149.9500       7.9       101       874        98
VIS    2025250    200200   22.8200  149.9100       7.5       102       874        98
VIS    2025250    200200   22.8100  149.9100       7.3       104       892        96
VIS    2025250    200200   22.8000  148.9200       9.3        96       988        99
VIS    2025250    200200   22.7900  148.8900       9.7        97       961       100
VIS    2025250    200200   22.8100  148.8700       9.8        97       961        99
VIS    2025250    200200   22.7900  148.8500       9.9        99       936        99
VIS    2025250    200200   22.8000  148.8200      10.2        99       889        94
VIS    2025250    200200   22.8000  148.8000      10.3        96       885        93
VIS    2025250    200200   22.7900  148.7600       9.9        96       884        95
VIS    2025250    200200   22.8100  148.7600       9.8        96       885        94
VIS    2025250    200200   22.8100  148.7200       9.5        95       882        97
VIS    2025250    200200   22.7900  148.6900       9.7        95       876        96
VIS    2025250    200200   22.7900  148.6700       9.9        95       876        95
VIS    2025250    200200   22.8000  148.6500       9.8        95       876        95
VIS    2025250    200200   22.8000  148.6200       9.5        97       876        96
VIS    2025250    200200   22.7900  148.5800       9.7       102       878        96
VIS    2025250    200200   22.7900  148.5800       9.8       103       879        96
VIS    2025250    200200   22.8000  148.5400       9.5       109       897        97
VIS    2025250    200200   22.8000  148.5100       9.6       109       886        93
VIS    2025250    200200   22.7900  148.4900       8.8       107       880        97
VIS    2025250    200200   22.7900  148.4600       8.4       102       886        99
VIS    2025250    200200   22.8100  148.4500       8.8       102       886        98
VIS    2025250    200200   22.8100  148.4100       9.5       101       878        97
VIS    2025250    200200   22.8000  148.3900       8.6        96       876        98
VIS    2025250    200200   22.8100  148.3500       8.3        87       874        92
VIS    2025250    200200   22.8100  148.3500       8.3        87       874        92
VIS    2025250    200200   22.7900  148.3000       9.6        95       873        95
VIS    2025250    200200   22.7900  148.2900      10.0        98       873        94
VIS    2025250    200200   22.7800  148.2700       9.4       105       874        96
VIS    2025250    200200   22.7800  148.2200       8.5        98       801        94
VIS    2025250    200200   22.7800  148.2000       9.0        93       806        93
VIS    2025250    200200   22.7800  148.1900       9.2        91       818        93
VIS    2025250    200200   22.7800  148.1500       9.6        89       847        94
VIS    2025250    200200   22.7800  148.1400       9.5        89       847        95
VIS    2025250    200200   22.7900  148.1000       9.1        88       840        94
VIS    2025250    200200   22.8000  148.0700       8.8        86       842        90
VIS    2025250    200200   22.8000  148.0300       9.3        87       895        96
VIS    2025250    200200   22.8000  148.0100       9.2        87       861        94
VIS    2025250    200200   22.8000  147.9700       8.4        86       840        92
VIS    2025250    200200   22.8000  147.9600       8.4        86       840        93
VIS    2025250    200200   22.7800  147.9300       9.3        88       841        94
VIS    2025250    200200   22.7800  147.9100       9.1        89       844        95
VIS    2025250    200200   22.7900  147.8700       8.7        87       877        97
VIS    2025250    200200   22.8000  147.8600       8.9        85       936        99
VIS    2025250    200200   22.8000  147.8400       9.4        86       956        99
VIS    2025250    200200   22.7900  147.1400      10.9        86       992       100
VIS    2025250    200200   22.7800  147.1300       9.9        85       992        99
VIS    2025250    200200   22.7900  147.1100       9.4        85       992        96
VIS    2025250    200200   22.7400  143.8300      12.8        94       998        97
VIS    2025250    200200   22.7500  143.8100      12.3        94       984        98
VIS    2025250    200200   22.7500  143.7800      11.9        95       965        99
VIS    2025250    200200   22.7500  143.7500      12.1        94       954        99
VIS    2025250    200200   22.7400  143.7200      11.5        90       932        99
VIS    2025250    200200   22.7500  143.6900      10.9        90       926        98
VIS    2025250    200200   22.7500  143.6900      10.9        90       926        99
VIS    2025250    200200   22.7600  143.6400      11.8        92       924        93
VIS    2025250    200200   22.7500  143.6400      11.8        91       924        95
VIS    2025250    200200   22.7300  143.6000      11.6        85       930        99
VIS    2025250    200200   22.7500  143.5800      11.3        89       918        99
VIS    2025250    200200   22.7400  143.5600      11.3        89       919        97
VIS    2025250    200200   22.7400  143.5400      10.6        89       928        98
VIS    2025250    200200   22.7500  143.0500      11.2        94       997       100
VIS    2025250    200200   22.7500  143.0300      11.2        94       996        99
VIS    2025250    200200   22.7500  143.0000      10.7        93       957        99
VIS    2025250    200200   22.7400  142.9800      10.5        91       962       100
VIS    2025250    200200   22.7500  142.9500      10.9        90       966        99
VIS    2025250    200200   22.7400  142.9200      10.6        90       973       100
VIS    2025250    200200   22.7500  142.9100      10.5        91       967       100
VIS    2025250    200200   22.7500  142.8800      10.6        90       973       100
VIS    2025250    200200   22.7300  142.8400      10.7        91       997       100
VIS    2025250    200200   22.7300  142.8000      10.9        92       981        99
VIS    2025250    200200   22.7400  142.7900      10.9        92       978       100
VIS    2025250    200200   22.7500  142.7500      10.4        90       937        99
VIS    2025250    200200   22.7500  142.7400      10.2        90       937        98
VIS    2025250    200200   22.7400  142.6600      10.2        87       973        97
VIS    2025250    200200   22.7500  142.6400      10.2        88       965        96
VIS    2025250    200200   22.8100  151.5900       6.5        86       966        94
VIS    2025250    200200   22.8200  151.5800       6.7        86       958        96
VIS    2025250    200200   22.8300  151.5500       7.4        89       943        96
VIS    2025250    200200   22.8100  151.5000       6.7        80       923        92
VIS    2025250    200200   22.8100  151.5000       6.7        80       923        91
VIS    2025250    200200   22.8200  151.4700       7.4        84       914        90
VIS    2025250    200200   22.8100  151.4500       7.5        81       914        90
VIS    2025250    200200   22.8000  150.2200       9.6       114       907        95
VIS    2025250    200200   22.8000  150.2000       9.3       113       878        99
VIS    2025250    200200   22.8000  150.1600       9.0       107       871        99
VIS    2025250    200200   22.7900  150.1400       9.7       106       870        98
VIS    2025250    200200   22.7900  150.1300      10.0       106       871        97
VIS    2025250    200200   22.8000  150.0900       9.8       106       867        98
VIS    2025250    200200   22.7900  150.0800       9.5       103       869        99
VIS    2025250    200200   22.7900  150.0300       7.8       103       865        99
VIS    2025250    200200   22.7800  150.0200       7.7       101       868        99
VIS    2025250    200200   22.7800  149.9800       7.8        93       875        95
VIS    2025250    200200   22.8000  149.9500       7.8        99       875        96
VIS    2025250    200200   22.8000  149.9400       7.9       102       875        98
VIS    2025250    200200   22.7800  149.9000       7.0       103       897        98
VIS    2025250    200200   22.7800  149.8900       6.9       103       897        98
VIS    2025250    200200   22.7800  149.8500       7.3       106       960        91
VIS    2025250    200200   22.7800  149.8200       7.9       108       969        90
VIS    2025250    200200   22.7900  149.8000       7.8       106       969        91
VIS    2025250    200200   22.7700  148.9200      10.8        99       984        97
VIS    2025250    200200   22.7700  148.8900      10.3        97       947        99
VIS    2025250    200200   22.7700  148.8600       9.9        98       920        98
VIS    2025250    200200   22.7700  148.8600       9.9        98       904        97
VIS    2025250    200200   22.7700  148.8100       9.5        96       879        95
VIS    2025250    200200   22.7700  148.8000       9.5        95       879        95
VIS    2025250    200200   22.7700  148.7800       9.6        93       878        94
VIS    2025250    200200   22.7800  148.7400       9.6        95       883        97
VIS    2025250    200200   22.7800  148.7100       9.6        93       882        96
VIS    2025250    200200   22.7600  148.6800      10.1        96       876        94
VIS    2025250    200200   22.7600  148.6600      10.0        97       878        94
VIS    2025250    200200   22.7600  148.6500      10.0        97       888        94
VIS    2025250    200200   22.7600  148.6000       9.3        96       878        97
VIS    2025250    200200   22.7800  148.5800       9.6       101       878        96
VIS    2025250    200200   22.7800  148.5500       9.8       101       879        96
VIS    2025250    200200   22.7800  148.5500       9.8       101       879        96
VIS    2025250    200200   22.7600  148.5200       9.0        97       878        97
VIS    2025250    200200   22.7600  148.5000       8.4       100       875        98
VIS    2025250    200200   22.7800  148.4500       8.5        96       886        98
VIS    2025250    200200   22.7800  148.4300       8.8        91       886        97
VIS    2025250    200200   22.7700  148.4000       8.1        89       879        97
VIS    2025250    200200   22.7600  148.3900       7.9        89       879        97
VIS    2025250    200200   22.7700  148.3500       7.8        89       872        93
VIS    2025250    200200   22.7600  148.3300       7.5        88       872        97
VIS    2025250    200200   22.7700  148.3100       9.1        91       873        96
VIS    2025250    200200   22.7800  148.2900      10.3       101       874        94
VIS    2025250    200200   22.7700  148.2700       9.9       105       873        95
VIS    2025250    200200   22.7800  148.2400       8.0       105       806        97
VIS    2025250    200200   22.7600  148.2100       8.6        93       813        93
VIS    2025250    200200   22.7700  148.1800       9.2        89       842        95
VIS    2025250    200200   22.7800  148.1500       9.6        89       849        94
VIS    2025250    200200   22.7600  148.1200       9.3        89       845        95
VIS    2025250    200200   22.7600  148.1100       9.2        90       842        95
VIS    2025250    200200   22.7600  148.0800       9.4        88       831        91
VIS    2025250    200200   22.7700  148.0400       8.8        89       842        92
VIS    2025250    200200   22.7800  147.9900       8.8        87       840        94
VIS    2025250    200200   22.7600  147.9900       9.0        87       838        93
VIS    2025250    200200   22.7600  147.9400       9.4        87       839        93
VIS    2025250    200200   22.7500  147.9200       9.3        87       841        93
VIS    2025250    200200   22.7700  147.9100       9.2        89       841        95
VIS    2025250    200200   22.7500  147.8700       9.1        87       902        98
VIS    2025250    200200   22.7600  147.8400       9.7        85       936        98
VIS    2025250    200200   22.7600  147.8300      10.0        85       946        98
VIS    2025250    200200   22.7600  147.8000       9.6        86       946        99
VIS    2025250    200200   22.7600  147.1800       9.1        88       996        95
VIS    2025250    200200   22.7500  147.1500       8.6        87       989        93
VIS    2025250    200200   22.7200  143.8600      12.9        93       999        99
VIS    2025250    200200   22.7100  143.8300      12.7        91       979        99
VIS    2025250    200200   22.7300  143.8200      12.6        92       979        99
VIS    2025250    200200   22.7200  143.7900      11.9        92       965        98
VIS    2025250    200200   22.7100  143.7500      11.6        93       951        97
VIS    2025250    200200   22.7100  143.7300      11.6        91       933        99
VIS    2025250    200200   22.7300  143.7200      11.4        90       932        98
VIS    2025250    200200   22.7300  143.6300      11.9        89       946        95
VIS    2025250    200200   22.7300  143.6200      11.7        88       946        97
VIS    2025250    200200   22.7300  143.5900      11.6        86       930        98
VIS    2025250    200200   22.7300  143.5600      11.3        89       929        98
VIS    2025250    200200   22.7300  143.5500      11.0        89       929        97
VIS    2025250    200200   22.7100  143.3400      10.8        94       981        99
VIS    2025250    200200   22.7100  143.0000      10.2        91       962        98
VIS    2025250    200200   22.7200  142.8600      10.7        90       999        98
VIS    2025250    200200   22.7000  142.8200      10.7        90       992        94
VIS    2025250    200200   22.7200  142.7800      10.6        89       948        97
VIS    2025250    200200   22.7200  142.7800      10.5        89       948        97
VIS    2025250    200200   22.8100  151.5900       6.6        86       966        92
VIS    2025250    200200   22.8000  151.5700       6.6        87       958        93
VIS    2025250    200200   22.7800  151.5300       6.7        88       943        93
VIS    2025250    200200   22.8000  151.5100       6.7        81       923        94
VIS    2025250    200200   22.7800  151.5000       7.0        87       909        91
VIS    2025250    200200   22.7900  151.4400       6.8        76       906        90
VIS    2025250    200200   22.7600  150.2200      10.3       109       901        97
VIS    2025250    200200   22.7600  150.2200      10.2       109       892        97
VIS    2025250    200200   22.7800  150.1800       9.5       110       872        98
VIS    2025250    200200   22.7800  150.1600       9.3       107       871        98
VIS    2025250    200200   22.7700  150.1300      10.0       104       871        98
VIS    2025250    200200   22.7700  150.1100      10.4       104       871        97
VIS    2025250    200200   22.7600  150.0700       9.6       101       870        98
VIS    2025250    200200   22.7700  150.0500       8.7       101       870        99
VIS    2025250    200200   22.7600  150.0200       7.9        98       872        98
VIS    2025250    200200   22.7600  150.0000       7.9        96       875        98
VIS    2025250    200200   22.7700  149.9900       7.8        94       875        96
VIS    2025250    200200   22.7600  149.9400       7.6       103       896        99
VIS    2025250    200200   22.7600  149.9200       7.5       105       896        99
VIS    2025250    200200   22.7800  149.8900       7.1       102       897        98
VIS    2025250    200200   22.7700  149.8700       7.6       105       907        99
VIS    2025250    200200   22.7700  149.8500       8.0       110       945        91
VIS    2025250    200200   22.7700  149.8100       7.6       107       953        90
VIS    2025250    200200   22.7500  148.9000      10.6        91       966        97
VIS    2025250    200200   22.7400  148.8900      10.4        90       936        97
VIS    2025250    200200   22.7500  148.8500       9.5        98       904        98
VIS    2025250    200200   22.7500  148.8300       9.3        98       888        98
VIS    2025250    200200   22.7500  148.8100       9.3        96       888        97
VIS    2025250    200200   22.7500  148.7700       9.5        91       878        95
VIS    2025250    200200   22.7600  148.7500       9.5        95       878        95
VIS    2025250    200200   22.7600  148.7400       9.5        95       878        95
VIS    2025250    200200   22.7500  148.7000      10.1        94       879        94
VIS    2025250    200200   22.7500  148.6700      10.1        96       882        96
VIS    2025250    200200   22.7500  148.6600      10.1        97       882        94
VIS    2025250    200200   22.7600  148.6400       9.8        97       888        95
VIS    2025250    200200   22.7600  148.6000       9.3        95       881        97
VIS    2025250    200200   22.7500  148.5900       9.5        92       881        96
VIS    2025250    200200   22.7400  148.5600      10.1        93       879        95
VIS    2025250    200200   22.7600  148.5200       9.1        96       878        97
VIS    2025250    200200   22.7600  148.5100       8.9        97       875        97
VIS    2025250    200200   22.7500  148.4700       8.5        94       880        95
VIS    2025250    200200   22.7600  148.4500       8.4        89       883        94
VIS    2025250    200200   22.7400  148.4100       8.8        88       883        97
VIS    2025250    200200   22.7600  148.3900       7.8        89       878        97
VIS    2025250    200200   22.7400  148.3800       8.0        92       878        99
VIS    2025250    200200   22.7300  148.3500       6.6        88       877        96
VIS    2025250    200200   22.7400  148.3100       7.7        89       877        98
VIS    2025250    200200   22.7300  148.3000       7.8        90       877        98
VIS    2025250    200200   22.7400  148.2600       9.1        92       877        98
VIS    2025250    200200   22.7500  148.2500       8.7        95       872        98
VIS    2025250    200200   22.7400  148.2100       7.9        87       814        92
VIS    2025250    200200   22.7300  148.1900       8.4        87       836        92
VIS    2025250    200200   22.7500  148.1600       9.6        87       849        92
VIS    2025250    200200   22.7500  148.1300       9.5        88       849        95
VIS    2025250    200200   22.7300  148.1100       9.3        90       834        93
VIS    2025250    200200   22.7400  148.1000       9.3        90       831        92
VIS    2025250    200200   22.7400  148.0800       9.5        87       831        90
VIS    2025250    200200   22.7500  148.0400       8.9        88       840        93
VIS    2025250    200200   22.7300  148.0100       8.9        87       834        91
VIS    2025250    200200   22.7300  147.9900       9.2        86       834        91
VIS    2025250    200200   22.7400  147.9700       9.1        87       837        94
VIS    2025250    200200   22.7500  147.9300       9.2        87       841        94
VIS    2025250    200200   22.7400  147.9200       9.0        87       841        94
VIS    2025250    200200   22.7300  147.8800       9.1        86       846        92
VIS    2025250    200200   22.7500  147.8700       9.1        88       880        97
VIS    2025250    200200   22.7300  147.8200      10.1        86       946        98
VIS    2025250    200200   22.7100  146.3300      12.3        85       996        98
VIS    2025250    200200   22.7100  146.3100      11.8        85       996        96
VIS    2025250    200200   22.7100  146.2700      11.4        86       963       100
VIS    2025250    200200   22.7000  143.8300      12.5        89       979        99
VIS    2025250    200200   22.6900  143.8100      12.2        90       965        99
VIS    2025250    200200   22.7000  143.7800      11.8        93       956        98
VIS    2025250    200200   22.7000  143.7500      11.5        93       953        96
VIS    2025250    200200   22.7000  143.7300      11.6        91       933        99
VIS    2025250    200200   22.7000  143.7200      11.7        91       930        97
VIS    2025250    200200   22.7000  143.6100      11.3        90       971        95
VIS    2025250    200200   22.6900  143.5700      10.8        89       968        98
VIS    2025250    200200   22.6800  143.4100      10.8        92       996        99
VIS    2025250    200200   22.6800  143.4000      11.0        93       975        99
VIS    2025250    200200   22.6800  143.3600      10.7        95       975        99
VIS    2025250    200200   22.6900  142.9000      11.2        91       978        93
VIS    2025250    200200   22.7700  151.5900       6.7        91       999        92
VIS    2025250    200200   22.7800  151.5400       6.8        89       944        90
VIS    2025250    200200   22.7700  151.5300       6.7        91       939        92
VIS    2025250    200200   22.7800  151.5100       7.1        88       918        92
VIS    2025250    200200   22.7700  151.4600       6.6        88       888        91
VIS    2025250    200200   22.7800  151.4400       6.4        79       906        92
VIS    2025250    200200   22.7600  150.2200      10.3       108       892        97
VIS    2025250    200200   22.7600  150.2100      10.2       108       892        97
VIS    2025250    200200   22.7400  150.1800       9.6       105       877        98
VIS    2025250    200200   22.7600  150.1600       9.3       106       871        99
VIS    2025250    200200   22.7500  150.1300       9.9       103       871        99
VIS    2025250    200200   22.7400  150.0900      10.3       102       868        98
VIS    2025250    200200   22.7500  150.0700       9.3       100       870        99
VIS    2025250    200200   22.7400  150.0500       8.6        98       870        97
VIS    2025250    200200   22.7500  150.0100       8.0        97       872        97
VIS    2025250    200200   22.7500  150.0000       7.9        96       875        98
VIS    2025250    200200   22.7300  149.9600       7.8       100       894        98
VIS    2025250    200200   22.7400  149.9400       7.4       103       894        97
VIS    2025250    200200   22.7500  149.9300       7.3       105       896        99
VIS    2025250    200200   22.7300  149.8800       7.4       105       892        96
VIS    2025250    200200   22.7500  149.8600       7.9       110       907        98
VIS    2025250    200200   22.7500  149.8400       8.0       113       907        95
VIS    2025250    200200   22.7500  149.7900       7.8       110       915        95
VIS    2025250    200200   22.7300  149.7700       8.6       114       915        94
VIS    2025250    200200   22.7300  148.9100      10.3        84       984        97
VIS    2025250    200200   22.7400  148.8900      10.2        89       951        98
VIS    2025250    200200   22.7200  148.8800       9.9        89       951        98
VIS    2025250    200200   22.7400  148.8600       9.6        96       909        98
VIS    2025250    200200   22.7100  148.8100       8.8        93       888        98
VIS    2025250    200200   22.7200  148.8000       9.0        93       888        98
VIS    2025250    200200   22.7100  148.7600       9.9        96       878        93
VIS    2025250    200200   22.7300  148.7500       9.5        95       878        95
VIS    2025250    200200   22.7100  148.7300       9.9        94       879        96
VIS    2025250    200200   22.7100  148.7000      10.0        92       881        97
VIS    2025250    200200   22.7300  148.6700       9.9        93       883        97
VIS    2025250    200200   22.7200  148.6500       9.5        94       896        98
VIS    2025250    200200   22.7300  148.6200       9.3        95       888        99
VIS    2025250    200200   22.7200  148.5800       9.5        90       884        98
VIS    2025250    200200   22.7300  148.5700       9.8        91       882        97
VIS    2025250    200200   22.7200  148.5300       9.6        91       879        98
VIS    2025250    200200   22.7300  148.5100       8.9        94       879        97
VIS    2025250    200200   22.7300  148.5000       8.6        96       880        97
VIS    2025250    200200   22.7300  148.4600       8.5        88       881        96
VIS    2025250    200200   22.7300  148.4300       8.6        81       882        94
VIS    2025250    200200   22.7200  148.4100       9.0        89       881        97
VIS    2025250    200200   22.7200  148.3900       8.6        96       879        99
VIS    2025250    200200   22.7100  148.3700       7.3        96       878        97
VIS    2025250    200200   22.7100  148.3200       7.6        88       877        98
VIS    2025250    200200   22.7100  148.3100       7.6        91       877        99
VIS    2025250    200200   22.7100  148.2900       8.0        90       879        99
VIS    2025250    200200   22.7200  148.2600       7.9        84       877        97
VIS    2025250    200200   22.7100  148.2100       7.6        82       829        91
VIS    2025250    200200   22.7100  148.1900       7.9        83       857        92
VIS    2025250    200200   22.7200  148.1400       9.5        84       855        91
VIS    2025250    200200   22.7200  148.1200       9.4        87       849        92
VIS    2025250    200200   22.7300  148.1100       9.3        89       843        93
VIS    2025250    200200   22.7100  148.0800       9.4        87       831        91
VIS    2025250    200200   22.7200  148.0500       9.4        86       834        91
VIS    2025250    200200   22.7200  148.0300       9.1        87       834        91
VIS    2025250    200200   22.7200  148.0100       8.9        87       834        91
VIS    2025250    200200   22.7200  147.9900       9.2        85       834        91
VIS    2025250    200200   22.7100  147.9400       8.7        87       839        91
VIS    2025250    200200   22.7100  147.9400       8.5        87       839        91
VIS    2025250    200200   22.7200  147.8900       8.8        85       844        92
VIS    2025250    200200   22.7200  147.8700       9.4        86       850        92
VIS    2025250    200200   22.7000  147.8500      10.2        84       929        98
VIS    2025250    200200   22.7000  147.8300      10.3        85       950        98
VIS    2025250    200200   22.7000  146.3300      12.2        85       996        99
VIS    2025250    200200   22.6800  143.7900      11.8        93       956        95
VIS    2025250    200200   22.6800  143.7500      11.5        91       962        95
VIS    2025250    200200   22.6700  143.7300      11.7        91       954        98
VIS    2025250    200200   22.6700  143.7100      12.3        93       954        98
VIS    2025250    200200   22.6800  143.4100      10.8        92       996        99
VIS    2025250    200200   22.6800  143.4000      11.0        93       978        99
VIS    2025250    200200   22.6800  143.3600      10.9        95       971        99
VIS    2025250    200200   22.6600  143.3500      11.4        95       971        99
VIS    2025250    200200   22.6700  143.3200      11.5        95       971        95
VIS    2025250    200200   22.7300  151.4800       5.7        97       952        99
VIS    2025250    200200   22.7300  151.4600       5.4        98       947        90
VIS    2025250    200200   22.7300  151.3900       5.9       100       971        98
VIS    2025250    200200   22.7300  151.3400       6.0        97       985        94
VIS    2025250    200200   22.7200  150.2400      11.0       109       895        97
VIS    2025250    200200   22.7300  150.2200      10.4       108       892        98
VIS    2025250    200200   22.7300  150.2100      10.0       106       879        99
VIS    2025250    200200   22.7300  150.1800       9.7       103       877        98
VIS    2025250    200200   22.7300  150.1500       9.3       101       871        99
VIS    2025250    200200   22.7200  150.1200       9.8       103       871        99
VIS    2025250    200200   22.7300  150.0800      10.3       102       868        98
VIS    2025250    200200   22.7200  150.0600       9.2       100       868        98
VIS    2025250    200200   22.7100  150.0500       8.6        97       872        96
VIS    2025250    200200   22.7100  150.0200       8.3        95       890        93
VIS    2025250    200200   22.7200  149.9800       7.9        99       898        97
VIS    2025250    200200   22.7100  149.9500       7.7       102       880        97
VIS    2025250    200200   22.7100  149.9500       7.7       103       881        97
VIS    2025250    200200   22.7200  149.9100       7.5       103       891        92
VIS    2025250    200200   22.7300  149.8900       7.5       104       891        93
VIS    2025250    200200   22.7200  149.8600       7.2       109       892        95
VIS    2025250    200200   22.7000  149.8300       7.0       108       892        94
VIS    2025250    200200   22.7100  149.8200       7.2       109       888        91
VIS    2025250    200200   22.7200  149.7800       8.4       114       901        97
VIS    2025250    200200   22.7000  149.7700       8.9       113       914        97
VIS    2025250    200200   22.7100  148.8900       9.8        87       951        98
VIS    2025250    200200   22.6900  148.8600       9.4        92       923        99
VIS    2025250    200200   22.7000  148.8400       9.0        94       909        99
VIS    2025250    200200   22.7000  148.8100       8.7        94       888        99
VIS    2025250    200200   22.7100  148.8000       8.9        94       888        98
VIS    2025250    200200   22.6900  148.7600      10.2        96       878        94
VIS    2025250    200200   22.7100  148.7500      10.0        96       879        93
VIS    2025250    200200   22.6900  148.7000       9.7        91       881        97
VIS    2025250    200200   22.6900  148.7000       9.8        91       883        97
VIS    2025250    200200   22.7100  148.6600       9.4        90       884        97
VIS    2025250    200200   22.6900  148.6300       9.7        96       888        97
VIS    2025250    200200   22.6900  148.6200       9.7        96       893        98
VIS    2025250    200200   22.7100  148.6000       9.5        94       893        99
VIS    2025250    200200   22.6900  148.5500       9.7        95       893        97
VIS    2025250    200200   22.6900  148.5300       9.2        92       882        96
VIS    2025250    200200   22.7000  148.5200       9.0        91       881        98
VIS    2025250    200200   22.6800  148.4900       8.9        94       882        96
VIS    2025250    200200   22.7000  148.4600       8.6        94       881        94
VIS    2025250    200200   22.7000  148.4300       8.0        90       881        97
VIS    2025250    200200   22.6900  148.4000       8.4        97       881        93
VIS    2025250    200200   22.6900  148.3900       8.0        96       881        92
VIS    2025250    200200   22.7000  148.3700       7.1        96       878        96
VIS    2025250    200200   22.6800  148.3400       7.7        92       882        98
VIS    2025250    200200   22.6800  148.2900       8.3        91       888        99
VIS    2025250    200200   22.7000  148.2900       8.0        91       880        99
VIS    2025250    200200   22.7000  148.2600       7.7        83       879        96
VIS    2025250    200200   22.7000  148.1900       7.9        82       863        92
VIS    2025250    200200   22.6900  148.1500       9.1        86       863        93
VIS    2025250    200200   22.7000  148.1200       9.5        87       845        91
VIS    2025250    200200   22.6800  148.1000       9.3        87       839        90
VIS    2025250    200200   22.6900  148.0900       9.4        87       833        91
VIS    2025250    200200   22.6900  148.0600       8.9        86       833        91
VIS    2025250    200200   22.6900  148.0300       8.5        86       834        91
VIS    2025250    200200   22.6900  148.0000       8.9        84       837        91
VIS    2025250    200200   22.6800  147.9700       9.3        85       847        91
VIS    2025250    200200   22.6800  147.9500       9.4        87       847        92
VIS    2025250    200200   22.6800  147.9200       9.7        87       849        91
VIS    2025250    200200   22.6800  147.9100       9.7        86       849        91
VIS    2025250    200200   22.7000  147.8700       9.7        85       856        91
VIS    2025250    200200   22.7000  147.8400      10.4        84       950        98
VIS    2025250    200200   22.7000  147.8300      10.4        84       950        97
VIS    2025250    200200   22.6500  143.7600      11.9        91       977        95
VIS    2025250    200200   22.6500  143.3900      11.3        92       994        97
VIS    2025250    200200   22.6500  143.3700      11.4        93       978        97
VIS    2025250    200200   22.6300  143.3300      11.8        94       995        99
VIS    2025250    200200   22.6300  143.3200      11.7        93       988        99
VIS    2025250    200200   22.6300  143.2500      11.2        91       995       100
VIS    2025250    200200   22.6300  143.2000      11.3        94       983        98
VIS    2025250    200200   22.6300  143.1100      10.4        95       996        97
VIS    2025250    200200   22.6300  143.0900      10.9        92       980        99
VIS    2025250    200200   22.6300  143.0700      11.1        89       981        98
VIS    2025250    200200   22.7200  151.4900       5.3        96       952        98
VIS    2025250    200200   22.7200  151.4700       5.5        98       951        93
VIS    2025250    200200   22.7000  151.4000       5.8        98       968        94
VIS    2025250    200200   22.7200  151.3600       5.9        95       971        99
VIS    2025250    200200   22.7000  151.3500       6.3        96       912        97
VIS    2025250    200200   22.7000  150.2400      10.8       108       889        92
VIS    2025250    200200   22.6900  150.2200      10.5       108       870        98
VIS    2025250    200200   22.6900  150.1700      10.1       104       870        98
VIS    2025250    200200   22.6900  150.1700      10.2       103       870        98
VIS    2025250    200200   22.6900  150.1300       9.6       103       874        98
VIS    2025250    200200   22.7000  150.1000       9.8       103       871        99
VIS    2025250    200200   22.7000  150.0800       9.6       101       867        98
VIS    2025250    200200   22.6900  150.0500       8.8        97       870        98
VIS    2025250    200200   22.6900  150.0200       8.1        95       871        95
VIS    2025250    200200   22.7000  150.0000       8.1        97       881        95
VIS    2025250    200200   22.7000  149.9700       7.8       101       880        96
VIS    2025250    200200   22.7000  149.9500       7.6       102       880        96
VIS    2025250    200200   22.7000  149.8400       6.9       107       896        91
VIS    2025250    200200   22.6900  149.8100       7.8       106       882        97
VIS    2025250    200200   22.6800  149.8000       8.3       105       896        97
VIS    2025250    200200   22.7000  149.7600       8.8       111       946        91
VIS    2025250    200200   22.6800  148.9000       9.4        88       987        99
VIS    2025250    200200   22.6700  148.9000       9.4        90       979        99
VIS    2025250    200200   22.6600  148.8500       9.3        93       912        99
VIS    2025250    200200   22.6800  148.8400       9.1        93       905        99
VIS    2025250    200200   22.6700  148.8100       9.3        93       884        96
VIS    2025250    200200   22.6600  148.7900       9.7        94       873        95
VIS    2025250    200200   22.6800  148.7700      10.2        98       872        93
VIS    2025250    200200   22.6700  148.7400       9.8        91       880        96
VIS    2025250    200200   22.6700  148.7000       9.3        88       881        97
VIS    2025250    200200   22.6600  148.6700       9.5        89       886        97
VIS    2025250    200200   22.6600  148.6600       9.6        90       886        97
VIS    2025250    200200   22.6600  148.6300       9.7        95       892        97
VIS    2025250    200200   22.6700  148.5900      10.4       101       907        96
VIS    2025250    200200   22.6600  148.5700      10.2       100       886        96
VIS    2025250    200200   22.6800  148.5500       9.8        96       892        97
VIS    2025250    200200   22.6600  148.5200       8.5        92       883        96
VIS    2025250    200200   22.6700  148.5000       8.5        91       881        97
VIS    2025250    200200   22.6600  148.4700       8.7        94       882       100
VIS    2025250    200200   22.6600  148.4400       8.4       101       882        99
VIS    2025250    200200   22.6600  148.4100       7.0       100       881        98
VIS    2025250    200200   22.6800  148.3900       7.5        90       881        90
VIS    2025250    200200   22.6600  148.3400       8.6        88       884        99
VIS    2025250    200200   22.6600  148.3100       9.0        92       892        99
VIS    2025250    200200   22.6600  148.3000       8.9        90       892        99
VIS    2025250    200200   22.6800  148.2800       8.3        87       891        98
VIS    2025250    200200   22.6700  148.2600       8.0        84       891        97
VIS    2025250    200200   22.6600  148.2200       7.7        82       883        92
VIS    2025250    200200   22.6700  148.2000       7.8        80       883        92
VIS    2025250    200200   22.6800  148.1700       8.7        85       892        96
VIS    2025250    200200   22.6500  148.1500       9.2        89       862        94
VIS    2025250    200200   22.6700  148.1200       9.4        88       852        92
VIS    2025250    200200   22.6500  148.1000       9.1        87       845        92
VIS    2025250    200200   22.6700  148.0600       8.6        85       834        91
VIS    2025250    200200   22.6600  148.0500       8.4        84       834        91
VIS    2025250    200200   22.6700  147.9800       9.3        84       847        90
VIS    2025250    200200   22.6600  147.9400      10.3        90       858        92
VIS    2025250    200200   22.6700  147.9100      10.1        87       854        91
VIS    2025250    200200   22.6700  147.9000      10.1        87       854        91
VIS    2025250    200200   22.6700  147.8500      10.0        87       952        99
VIS    2025250    200200   22.6700  147.8400      10.1        86       961        97
VIS    2025250    200200   22.6100  143.3400      11.7        94       999        99
VIS    2025250    200200   22.6200  143.3200      11.8        93       988        99
VIS    2025250    200200   22.6200  143.3100      11.7        92       988       100
VIS    2025250    200200   22.6000  143.2300      11.6        95       975        99
VIS    2025250    200200   22.6100  143.2100      11.3        93       965        99
VIS    2025250    200200   22.6000  143.1900      11.2        93       965        98
VIS    2025250    200200   22.6000  143.1300      10.3        96       975        98
VIS    2025250    200200   22.6000  143.1000      10.2        94       969        99
VIS    2025250    200200   22.6000  143.0700      10.8        91       969       100
VIS    2025250    200200   22.6100  143.0400      11.0        92       980        99
VIS    2025250    200200   22.6100  143.0400      11.0        92       978        99
VIS    2025250    200200   22.7000  151.4900       5.0        94       952        95
VIS    2025250    200200   22.7000  151.4600       5.3        96       952        91
VIS    2025250    200200   22.7000  151.4100       5.6        99       968        90
VIS    2025250    200200   22.6900  151.4000       5.9        98       968        96
VIS    2025250    200200   22.7000  151.3600       5.8        93       912        99
VIS    2025250    200200   22.7000  151.3400       6.2        95       906        97
VIS    2025250    200200   22.6600  150.2300      10.7       107       870        97
VIS    2025250    200200   22.6700  150.2200      10.7       108       869        97
VIS    2025250    200200   22.6600  150.1800      10.2       104       868        98
VIS    2025250    200200   22.6700  150.1600      10.2       101       871        97
VIS    2025250    200200   22.6700  150.1400      10.0       101       874        97
VIS    2025250    200200   22.6700  150.1000       9.5       103       873        99
VIS    2025250    200200   22.6700  150.0900       9.5       102       871        99
VIS    2025250    200200   22.6600  150.0600       9.2        99       871        98
VIS    2025250    200200   22.6600  150.0300       8.2        96       870        95
VIS    2025250    200200   22.6600  149.9900       7.5        95       873        93
VIS    2025250    200200   22.6600  149.9800       7.3        94       875        92
VIS    2025250    200200   22.6600  149.9500       7.3       100       884        92
VIS    2025250    200200   22.6800  149.9400       7.3       101       884        92
VIS    2025250    200200   22.6700  149.7900       8.3       104       896        96
VIS    2025250    200200   22.6700  149.7800       8.3       102       953        91
VIS    2025250    200200   22.6400  148.9000      10.7        96       979        96
VIS    2025250    200200   22.6400  148.8800      10.1        96       970        98
VIS    2025250    200200   22.6400  148.8700      10.0        95       946        98
VIS    2025250    200200   22.6400  148.8500       9.3        95       896        98
VIS    2025250    200200   22.6500  148.8100       9.5        92       883        95
VIS    2025250    200200   22.6400  148.7900       9.8        91       873        92
VIS    2025250    200200   22.6600  148.7700       9.9        92       873        94
VIS    2025250    200200   22.6400  148.7300       9.5        87       882        97
VIS    2025250    200200   22.6400  148.7000       9.4        91       883        98
VIS    2025250    200200   22.6500  148.6800       9.6        90       884        97
VIS    2025250    200200   22.6600  148.6600       9.7        90       886        97
VIS    2025250    200200   22.6600  148.6400       9.8        94       892        97
VIS    2025250    200200   22.6300  148.6000      10.0        99       907        97
VIS    2025250    200200   22.6500  148.5700      10.1       100       886        96
VIS    2025250    200200   22.6500  148.5500       9.5        95       880        97
VIS    2025250    200200   22.6400  148.5300       8.7        94       879        97
VIS    2025250    200200   22.6500  148.5000       8.4        90       881        98
VIS    2025250    200200   22.6300  148.4800       8.3        90       880        99
VIS    2025250    200200   22.6400  148.4600       8.6        91       880        99
VIS    2025250    200200   22.6300  148.4300       7.4        88       882        98
VIS    2025250    200200   22.6300  148.4000       6.5        87       881        95
VIS    2025250    200200   22.6500  148.3700       7.1        78       880        90
VIS    2025250    200200   22.6500  148.3600       7.8        78       881        93
VIS    2025250    200200   22.6500  148.3400       8.8        86       888        98
VIS    2025250    200200   22.6300  148.3000       8.9        86       902        98
VIS    2025250    200200   22.6400  148.2800       8.9        88       899        99
VIS    2025250    200200   22.6500  148.2400       8.1        84       893        94
VIS    2025250    200200   22.6500  148.2300       7.9        83       891        92
VIS    2025250    200200   22.6300  148.2000       8.4        86       892        95
VIS    2025250    200200   22.6300  148.1800       8.9        87       883        95
VIS    2025250    200200   22.6400  148.1600       9.2        89       862        94
VIS    2025250    200200   22.6400  148.1300       9.1        90       854        94
VIS    2025250    200200   22.6500  148.1000       9.0        87       845        92
VIS    2025250    200200   22.6500  148.0600       8.4        83       837        90
VIS    2025250    200200   22.6400  148.0600       8.3        83       837        91
VIS    2025250    200200   22.6300  147.9600      10.4        90       883        93
VIS    2025250    200200   22.6400  147.9500      10.5        91       883        93
VIS    2025250    200200   22.6400  147.9100       9.9        88       866        93
VIS    2025250    200200   22.6300  147.9000       9.6        88       868        93
VIS    2025250    200200   22.6400  147.8800       9.5        88       907        97
VIS    2025250    200200   22.6300  147.8500       9.3        88       919        97
VIS    2025250    200200   22.6200  147.8200       8.8        88       962        91
VIS    2025250    200200   22.6200  147.4800       7.5        87       999        95
VIS    2025250    200200   22.6300  147.4600       8.1        83       999        94
VIS    2025250    200200   22.6300  146.3100      10.8        92       998        97
VIS    2025250    200200   22.5800  143.3400      11.8        93       999        99
VIS    2025250    200200   22.5800  143.3400      11.9        94       985        99
VIS    2025250    200200   22.6000  143.3100      12.2        93       985        97
VIS    2025250    200200   22.5800  143.2600      11.7        93       991        99
VIS    2025250    200200   22.5800  143.2300      11.4        94       972       100
VIS    2025250    200200   22.5900  143.2000      11.2        93       963        99
VIS    2025250    200200   22.5800  143.1700      11.1        92       947        99
VIS    2025250    200200   22.5800  143.1600      11.1        92       947        99
VIS    2025250    200200   22.5800  143.1200      10.3        91       935       100
VIS    2025250    200200   22.5900  143.1000      10.1        92       951       100
VIS    2025250    200200   22.6000  143.0700      10.6        91       965       100
VIS    2025250    200200   22.5900  143.0600      10.7        91       951       100
VIS    2025250    200200   22.6600  151.4800       4.9        98       961        96
VIS    2025250    200200   22.6500  151.4500       5.3        98       968       100
VIS    2025250    200200   22.6700  151.4200       5.7        96       971        99
VIS    2025250    200200   22.6700  151.4100       6.4        97       973        97
VIS    2025250    200200   22.6700  151.3700       5.9        87       919        97
VIS    2025250    200200   22.6500  151.3500       5.5        85       882        96
VIS    2025250    200200   22.6600  151.3100       4.4        86       869        94
VIS    2025250    200200   22.6400  150.2600       9.9       106       901        93
VIS    2025250    200200   22.6300  150.2300       9.7       104       878        99
VIS    2025250    200200   22.6300  150.2000       9.6       101       870        97
VIS    2025250    200200   22.6400  150.1900       9.8       101       870        97
VIS    2025250    200200   22.6400  150.1500      10.4       100       871        96
VIS    2025250    200200   22.6400  150.1300       9.8        99       874        98
VIS    2025250    200200   22.6300  150.1100       9.2        99       874        98
VIS    2025250    200200   22.6400  150.0900       9.1       101       874        99
VIS    2025250    200200   22.6500  150.0500       8.8        98       871        97
VIS    2025250    200200   22.6500  150.0200       7.8        95       871        96
VIS    2025250    200200   22.6300  150.0000       7.1        93       875        91
VIS    2025250    200200   22.6400  149.9900       7.1        93       875        91
VIS    2025250    200200   22.6300  148.8900      10.6        96       970        97
VIS    2025250    200200   22.6300  148.8800      10.1        96       959        97
VIS    2025250    200200   22.6200  148.8500       9.7        96       896        97
VIS    2025250    200200   22.6200  148.8200       9.6        94       883        96
VIS    2025250    200200   22.6100  148.8000       9.8        94       874        93
VIS    2025250    200200   22.6300  148.7700       9.9        91       873        92
VIS    2025250    200200   22.6300  148.7400       9.7        87       882        96
VIS    2025250    200200   22.6300  148.7300       9.6        88       884        97
VIS    2025250    200200   22.6100  148.7000      10.2        94       884        96
VIS    2025250    200200   22.6300  148.6800       9.9        94       884        97
VIS    2025250    200200   22.6300  148.6600      10.1        96       892        96
VIS    2025250    200200   22.6200  148.6100      10.0        99       913        97
VIS    2025250    200200   22.6300  148.6100      10.0        99       913        97
VIS    2025250    200200   22.6200  148.5800       9.4        94       879        98
VIS    2025250    200200   22.6100  148.5400       8.8        91       878        99
VIS    2025250    200200   22.6100  148.5300       8.4        93       879        99
VIS    2025250    200200   22.6200  148.5000       8.1        94       879        98
VIS    2025250    200200   22.6100  148.4700       8.3        94       880        99
VIS    2025250    200200   22.6100  148.4400       7.9        90       879        98
VIS    2025250    200200   22.6100  148.4000       7.5        91       880        98
VIS    2025250    200200   22.6300  148.4000       6.5        88       880        96
VIS    2025250    200200   22.6100  148.3700       7.4        86       881        98
VIS    2025250    200200   22.6100  148.3400       7.9        74       892        94
VIS    2025250    200200   22.6100  148.3200       8.4        76       900        95
VIS    2025250    200200   22.6300  148.2900       9.0        86       902        98
VIS    2025250    200200   22.6000  148.2500       9.1        85       894        95
VIS    2025250    200200   22.6000  148.2500       9.0        85       894        95
VIS    2025250    200200   22.6200  148.2100       8.5        85       898        95
VIS    2025250    200200   22.6100  148.1900       9.3        89       896        95
VIS    2025250    200200   22.6100  148.1500       9.4        91       860        93
VIS    2025250    200200   22.6100  148.1400       9.4        91       860        93
VIS    2025250    200200   22.6100  148.1100       9.1        91       845        94
VIS    2025250    200200   22.6100  148.0700       9.1        88       833        93
VIS    2025250    200200   22.6100  148.0500       8.8        87       845        92
VIS    2025250    200200   22.6100  148.0300       8.5        90       877        95
VIS    2025250    200200   22.6000  148.0000       9.5        90       877        95
VIS    2025250    200200   22.6000  147.9900       9.6        90       877        95
VIS    2025250    200200   22.6000  147.9600       9.4        89       844        93
VIS    2025250    200200   22.6100  147.9400       9.0        90       844        94
VIS    2025250    200200   22.6200  147.9000       9.2        87       854        91
VIS    2025250    200200   22.6100  147.8900       8.8        84       860        90
VIS    2025250    200200   22.6100  147.8400       8.8        85       907        95
VIS    2025250    200200   22.6000  147.8400       8.9        85       891        92
VIS    2025250    200200   22.6000  147.8000       9.5        87       941        93
VIS    2025250    200200   22.6100  147.4800       7.4        86       999        94
VIS    2025250    200200   22.6100  147.4700       7.5        85       999        94
VIS    2025250    200200   22.5600  144.3200      12.6        95       997        97
VIS    2025250    200200   22.5600  144.3200      12.7        96       997        97
VIS    2025250    200200   22.5600  144.2700      11.4        93       965        98
VIS    2025250    200200   22.5600  144.2700      11.2        93       969        98
VIS    2025250    200200   22.5600  144.1000      12.6       101       979        95
VIS    2025250    200200   22.5600  144.0900      12.3       101       979        94
VIS    2025250    200200   22.5500  143.3100      11.9        94       985        99
VIS    2025250    200200   22.5700  143.2700      11.7        92       991        99
VIS    2025250    200200   22.5600  143.2400      11.2        93       967       100
VIS    2025250    200200   22.5500  143.2300      11.1        92       956        99
VIS    2025250    200200   22.5700  143.1900      11.2        91       947        99
VIS    2025250    200200   22.5700  143.1700      11.1        90       932        99
VIS    2025250    200200   22.5600  143.1500      10.9        90       929        99
VIS    2025250    200200   22.5700  143.1300      10.6        90       931        99
VIS    2025250    200200   22.5700  143.0900      10.3        89       934        99
VIS    2025250    200200   22.5700  143.0800      10.4        88       934        99
VIS    2025250    200200   22.6400  151.4500       5.5        98       968        99
VIS    2025250    200200   22.6500  151.4400       5.6        97       968       100
VIS    2025250    200200   22.6300  151.3900       6.5        93       963        98
VIS    2025250    200200   22.6300  151.3900       6.4        91       963        98
VIS    2025250    200200   22.6300  151.3500       5.6        84       882        96
VIS    2025250    200200   22.6300  151.3400       5.2        85       863        95
VIS    2025250    200200   22.6300  150.2600       9.6       105       908        92
VIS    2025250    200200   22.6300  150.2300       9.5       103       878        99
VIS    2025250    200200   22.6200  150.2100       9.3       100       873        98
VIS    2025250    200200   22.6100  150.1900       9.3        99       873        97
VIS    2025250    200200   22.6300  150.1500      10.1        99       870        97
VIS    2025250    200200   22.6200  150.1400       9.8        99       872        98
VIS    2025250    200200   22.6100  150.1000       8.5        98       872        98
VIS    2025250    200200   22.6100  150.0900       8.5        97       872        97
VIS    2025250    200200   22.6100  150.0500       8.6        99       869        97
VIS    2025250    200200   22.6000  150.0300       8.0        98       873        98
VIS    2025250    200200   22.6200  150.0100       7.2        95       875        94
VIS    2025250    200200   22.6200  149.9900       6.9        93       883        90
VIS    2025250    200200   22.6100  149.9600       6.7        92       915        92
VIS    2025250    200200   22.6100  148.9000      10.7        97       977        95
VIS    2025250    200200   22.6000  148.8600      10.0        98       910        96
VIS    2025250    200200   22.5900  148.8300       9.9        95       895        96
VIS    2025250    200200   22.5900  148.8300       9.9        95       888        96
VIS    2025250    200200   22.6100  148.8000       9.9        94       874        93
VIS    2025250    200200   22.5900  148.7500       9.9        90       876        93
VIS    2025250    200200   22.6100  148.7400       9.9        89       883        97
VIS    2025250    200200   22.5900  148.7100      10.2        93       886        97
VIS    2025250    200200   22.5800  148.6800      10.1        91       888        97
VIS    2025250    200200   22.6000  148.6700      10.2        95       889        96
VIS    2025250    200200   22.5800  148.6400       9.8        92       896        97
VIS    2025250    200200   22.5800  148.6000       9.8        89       880        96
VIS    2025250    200200   22.5900  148.5900       9.7        89       880        97
VIS    2025250    200200   22.5900  148.5700       9.3        88       878        97
VIS    2025250    200200   22.5900  148.5300       8.2        92       879       100
VIS    2025250    200200   22.5800  148.5000       7.9        91       882        99
VIS    2025250    200200   22.5800  148.4900       7.9        91       882        99
VIS    2025250    200200   22.6000  148.4600       8.2        93       879        99
VIS    2025250    200200   22.6000  148.4400       8.0        90       878        98
VIS    2025250    200200   22.6000  148.4000       7.7        90       880        99
VIS    2025250    200200   22.5800  148.3700       8.4        84       889        97
VIS    2025250    200200   22.5800  148.3600       8.2        79       896        96
VIS    2025250    200200   22.6000  148.3400       7.8        74       900        92
VIS    2025250    200200   22.5900  148.3100       8.5        77       906        95
VIS    2025250    200200   22.5900  148.2800       9.3        87       899        98
VIS    2025250    200200   22.5900  148.2700       9.2        87       897        98
VIS    2025250    200200   22.6000  148.2400       9.1        85       881        94
VIS    2025250    200200   22.5800  148.2000       9.9        91       896        95
VIS    2025250    200200   22.5800  148.1800       9.9        93       854        92
VIS    2025250    200200   22.5800  148.1400       9.7        90       821        90
VIS    2025250    200200   22.6000  148.1200       9.3        91       828        93
VIS    2025250    200200   22.5900  148.1000       9.6        89       825        92
VIS    2025250    200200   22.5800  148.0800       9.7        88       825        90
VIS    2025250    200200   22.5800  148.0500       9.4        88       829        91
VIS    2025250    200200   22.5900  148.0100       9.1        91       845        93
VIS    2025250    200200   22.6000  148.0100       9.2        91       847        93
VIS    2025250    200200   22.6000  147.9600       9.3        88       842        92
VIS    2025250    200200   22.6000  147.9600       9.1        88       842        93
VIS    2025250    200200   22.5800  147.9300       7.6        82       844        90
VIS    2025250    200200   22.5900  147.8500       8.6        81       866        90
VIS    2025250    200200   22.5900  147.8000       9.8        88       941        96
VIS    2025250    200200   22.5700  147.5700       8.2        82       989        94
VIS    2025250    200200   22.5700  147.5600       8.1        83       989        91
VIS    2025250    200200   22.5800  147.3600       7.7        88       999        95
VIS    2025250    200200   22.5400  144.3600      12.1        92       995        92
VIS    2025250    200200   22.5500  144.3200      12.7        95       979        97
VIS    2025250    200200   22.5300  144.3200      12.8        97       963        96
VIS    2025250    200200   22.5300  144.2900      12.1        95       960        98
VIS    2025250    200200   22.5400  144.2700      11.5        96       965        97
VIS    2025250    200200   22.5400  144.2300      11.9        99       993        92
VIS    2025250    200200   22.5300  144.2000      11.9        99       993        91
VIS    2025250    200200   22.5500  144.1900      12.3        96       996        97
VIS    2025250    200200   22.5300  144.1200      12.8        99       985        94
VIS    2025250    200200   22.5300  144.1100      12.8        99       979        95
VIS    2025250    200200   22.5400  144.0800      12.2        99       967        97
VIS    2025250    200200   22.5400  144.0600      11.8        98       975        97
VIS    2025250    200200   22.5400  144.0400      12.9        96      1000        96
VIS    2025250    200200   22.5300  143.9600      11.5        93       997        95
VIS    2025250    200200   22.5500  143.3100      11.9        94       985        99
VIS    2025250    200200   22.5500  143.3000      11.5        93       981       100
VIS    2025250    200200   22.5300  143.2700      11.2        94       954        99
VIS    2025250    200200   22.5500  143.2500      11.2        92       971       100
VIS    2025250    200200   22.5500  143.2300      11.0        91       951        99
VIS    2025250    200200   22.5500  143.1900      11.2        90       929        97
VIS    2025250    200200   22.5400  143.1800      11.1        89       929        96
VIS    2025250    200200   22.5300  143.1500      10.9        89       925        97
VIS    2025250    200200   22.5500  143.1200      10.7        88       928        96
VIS    2025250    200200   22.5200  143.1000      10.5        86       924        98
VIS    2025250    200200   22.5400  143.0700      10.4        89       934        98
VIS    2025250    200200   22.6100  151.4800       5.5        91       958        98
VIS    2025250    200200   22.6100  151.4700       5.7        92       968        97
VIS    2025250    200200   22.6200  151.4500       5.5        97       968        90
VIS    2025250    200200   22.6100  151.4100       6.2        96       962        99
VIS    2025250    200200   22.6200  151.3800       6.1        89       916        98
VIS    2025250    200200   22.6100  151.3600       5.6        93       882        97
VIS    2025250    200200   22.6200  151.3300       5.2        87       860        96
VIS    2025250    200200   22.5800  150.2800       9.3        97       945        90
VIS    2025250    200200   22.5900  150.2500       9.2       100       934        91
VIS    2025250    200200   22.6000  150.2400       9.2       101       901        95
VIS    2025250    200200   22.5900  150.2200       9.3       100       887        99
VIS    2025250    200200   22.5900  150.1900       8.9        98       874        97
VIS    2025250    200200   22.5900  150.1700       8.7        98       876        98
VIS    2025250    200200   22.5800  150.1300       8.4        98       877        98
VIS    2025250    200200   22.6000  150.1100       8.5        99       872        98
VIS    2025250    200200   22.5900  150.0900       8.3        98       871        96
VIS    2025250    200200   22.5900  150.0400       8.1        96       869        97
VIS    2025250    200200   22.5900  150.0400       8.0        96       872        97
VIS    2025250    200200   22.5800  150.0100       7.3        91       876        94
VIS    2025250    200200   22.5700  149.7900       8.0        91       985        90
VIS    2025250    200200   22.5700  149.7600       8.1        94       983        91
VIS    2025250    200200   22.5700  149.7600       8.1        95       983        91
VIS    2025250    200200   22.5900  149.7300       8.4        99       983        95
VIS    2025250    200200   22.5600  148.8700      10.0        97       959        97
VIS    2025250    200200   22.5800  148.8500      10.0        97       910        97
VIS    2025250    200200   22.5800  148.8200       9.9        94       895        96
VIS    2025250    200200   22.5700  148.7900      10.0        90       888        95
VIS    2025250    200200   22.5600  148.7900      10.0        90       879        94
VIS    2025250    200200   22.5800  148.7600       9.9        89       876        93
VIS    2025250    200200   22.5600  148.7200       9.8        90       886        97
VIS    2025250    200200   22.5700  148.7100      10.0        92       887        97
VIS    2025250    200200   22.5600  148.6800       9.8        86       888        96
VIS    2025250    200200   22.5800  148.6500       9.8        91       896        97
VIS    2025250    200200   22.5800  148.6400       9.8        91       894        97
VIS    2025250    200200   22.5800  148.6000       9.9        89       880        96
VIS    2025250    200200   22.5800  148.5800       9.7        88       880        97
VIS    2025250    200200   22.5600  148.5600       9.2        89       879        97
VIS    2025250    200200   22.5700  148.5300       8.3        89       882        99
VIS    2025250    200200   22.5700  148.4900       7.8        90       883        99
VIS    2025250    200200   22.5700  148.4800       7.9        89       883        99
VIS    2025250    200200   22.5700  148.4600       8.0        89       878        98
VIS    2025250    200200   22.5500  148.4100       8.4        88       881        99
VIS    2025250    200200   22.5600  148.3800       8.6        87       891        99
VIS    2025250    200200   22.5600  148.3600       8.5        82       896        97
VIS    2025250    200200   22.5700  148.3500       8.3        79       896        95
VIS    2025250    200200   22.5600  148.3100       8.5        80       903        96
VIS    2025250    200200   22.5600  148.2900       9.1        86       900        97
VIS    2025250    200200   22.5600  148.2600       9.4        90       898        98
VIS    2025250    200200   22.5600  148.2500       9.5        90       898        98
VIS    2025250    200200   22.5500  148.2200       9.8        92       887        95
VIS    2025250    200200   22.5700  148.1800      10.0        95       847        91
VIS    2025250    200200   22.5700  148.1500       9.8        92       819        90
VIS    2025250    200200   22.5500  147.9200       8.5        81       852        91
VIS    2025250    200200   22.5600  147.9200       7.8        80       850        91
VIS    2025250    200200   22.5500  147.8800       8.7        85       870        92
VIS    2025250    200200   22.5600  147.8300       8.7        82       890        90
VIS    2025250    200200   22.5500  147.8100       8.8        84       920        97
VIS    2025250    200200   22.5500  147.5700       8.2        86       989        96
VIS    2025250    200200   22.5400  147.5300       8.0        88       935        91
VIS    2025250    200200   22.5600  147.5000       6.9        85       932        90
VIS    2025250    200200   22.5500  147.4500       6.9        91       964        93
VIS    2025250    200200   22.5600  147.4300       7.4        86       964        95
VIS    2025250    200200   22.5600  147.4000       8.4        94       983        95
VIS    2025250    200200   22.5400  147.3700       9.7       101       974        94
VIS    2025250    200200   22.5500  147.3500       9.0        97       968        96
VIS    2025250    200200   22.5400  147.3100       9.0        96       968        94
VIS    2025250    200200   22.5400  147.3000       9.0        95       968        94
VIS    2025250    200200   22.5400  147.2700       8.5        87       974        96
VIS    2025250    200200   22.5400  147.2400       9.2        85       970        94
VIS    2025250    200200   22.5400  147.1900      10.0        95       976        96
VIS    2025250    200200   22.5400  147.0300       8.6        92       974        93
VIS    2025250    200200   22.5100  144.4800      11.8        94       994        98
VIS    2025250    200200   22.5100  144.4500      11.7        95       987        98
VIS    2025250    200200   22.5100  144.4400      11.4        95       985        98
VIS    2025250    200200   22.5100  144.4200      11.7        95       985        96
VIS    2025250    200200   22.5100  144.3900      12.4        96       985        91
VIS    2025250    200200   22.5300  144.3100      12.9        97       963        96
VIS    2025250    200200   22.5300  144.2900      12.4        97       960        97
VIS    2025250    200200   22.5200  144.2600      11.5        98       965        96
VIS    2025250    200200   22.5100  144.2300      11.8       101       981        91
VIS    2025250    200200   22.5100  144.2200      11.9       100       981        91
VIS    2025250    200200   22.5200  144.1900      11.3        98       993        95
VIS    2025250    200200   22.5100  144.1300      12.8        98       981        96
VIS    2025250    200200   22.5100  144.1100      12.6        99       979        96
VIS    2025250    200200   22.5200  144.0800      12.2        98       955        97
VIS    2025250    200200   22.5100  144.0700      12.1        98       950        97
VIS    2025250    200200   22.5200  144.0400      12.3        97       956        97
VIS    2025250    200200   22.5100  144.0200      12.9        96       960        97
VIS    2025250    200200   22.5100  144.0000      12.7        94       960        98
VIS    2025250    200200   22.5200  143.9700      11.7        94       997        97
VIS    2025250    200200   22.5100  143.9400      12.2        97       976        96
VIS    2025250    200200   22.5100  143.9100      10.6       101       979        95
VIS    2025250    200200   22.5000  143.4100      11.7        97       989        96
VIS    2025250    200200   22.5200  143.3600      12.2        96       983        98
VIS    2025250    200200   22.5200  143.3500      12.0        96       981        98
VIS    2025250    200200   22.5200  143.3100      12.0        95       977        99
VIS    2025250    200200   22.5200  143.2700      11.0        94       954        98
VIS    2025250    200200   22.5200  143.2300      10.8        89       928        98
VIS    2025250    200200   22.5100  143.2200      10.6        85       926        98
VIS    2025250    200200   22.5000  143.1800      11.1        89       921        97
VIS    2025250    200200   22.5000  143.1700      11.2        90       921        97
VIS    2025250    200200   22.5200  143.1300      10.8        88       922        99
VIS    2025250    200200   22.5100  143.1100      10.8        88       922        98
VIS    2025250    200200   22.5000  143.1000      10.8        88       924        98
VIS    2025250    200200   22.5800  151.4800       5.4        93       975        98
VIS    2025250    200200   22.6000  151.4700       5.7        92       968        97
VIS    2025250    200200   22.5800  151.4300       7.4        88       962        90
VIS    2025250    200200   22.6000  151.4000       6.3        94       925        98
VIS    2025250    200200   22.6000  151.3700       5.6        95       882        97
VIS    2025250    200200   22.5700  151.3600       5.3        99       860        98
VIS    2025250    200200   22.5800  151.3400       5.4        95       859        97
VIS    2025250    200200   22.5600  150.2700       9.0        96       899        94
VIS    2025250    200200   22.5600  150.2500       8.9        98       897        96
VIS    2025250    200200   22.5600  150.2100       9.1       102       885        99
VIS    2025250    200200   22.5600  150.1800       8.8        97       876        98
VIS    2025250    200200   22.5700  150.1700       8.5        96       876        97
VIS    2025250    200200   22.5700  150.1300       8.4        98       877        98
VIS    2025250    200200   22.5700  150.1200       8.4        98       873        98
VIS    2025250    200200   22.5700  150.1000       8.2        98       871        97
VIS    2025250    200200   22.5600  150.0600       7.8        94       873        94
VIS    2025250    200200   22.5500  150.0300       7.4        90       875        93
VIS    2025250    200200   22.5700  150.0100       7.2        90       888        92
VIS    2025250    200200   22.5600  149.7700       7.9        90       978        93
VIS    2025250    200200   22.5500  149.7300       7.9        96       927        97
VIS    2025250    200200   22.5500  148.8800       9.8        94       981        95
VIS    2025250    200200   22.5400  148.8500      10.0        94       959        98
VIS    2025250    200200   22.5600  148.8300      10.0        93       905        96
VIS    2025250    200200   22.5400  148.8100      10.0        90       893        95
VIS    2025250    200200   22.5400  148.7800       9.9        89       879        94
VIS    2025250    200200   22.5400  148.7500       9.8        90       879        95
VIS    2025250    200200   22.5500  148.7300       9.6        90       885        98
VIS    2025250    200200   22.5500  148.7100       9.6        89       886        97
VIS    2025250    200200   22.5400  148.6800       9.6        85       884        96
VIS    2025250    200200   22.5300  148.6500      10.0        90       891        97
VIS    2025250    200200   22.5500  148.6300      10.1        92       891        97
VIS    2025250    200200   22.5400  148.6000      10.2        93       889        97
VIS    2025250    200200   22.5500  148.5700       9.5        89       879        96
VIS    2025250    200200   22.5500  148.5600       9.4        89       879        96
VIS    2025250    200200   22.5300  148.5300       7.9        84       883        97
VIS    2025250    200200   22.5300  148.5100       7.5        85       883        97
VIS    2025250    200200   22.5300  148.4700       7.9        83       878        96
VIS    2025250    200200   22.5500  148.4500       8.0        85       878        97
VIS    2025250    200200   22.5300  148.4200       7.8        84       879        97
VIS    2025250    200200   22.5400  148.4000       8.0        85       884        98
VIS    2025250    200200   22.5300  148.3700       8.4        83       897        97
VIS    2025250    200200   22.5500  148.3600       8.6        81       897        97
VIS    2025250    200200   22.5400  148.3200       9.1        83       900        97
VIS    2025250    200200   22.5400  148.3000       9.2        88       898        98
VIS    2025250    200200   22.5400  148.2600       9.6        95       899        97
VIS    2025250    200200   22.5300  148.2300      10.0        98       898        95
VIS    2025250    200200   22.5400  148.2300       9.9        96       898        95
VIS    2025250    200200   22.5400  148.1000       9.6        84       821        90
VIS    2025250    200200   22.5300  148.0500       8.4        84       828        91
VIS    2025250    200200   22.5200  148.0300       8.1        83       831        91
VIS    2025250    200200   22.5300  148.0100       8.2        82       836        90
VIS    2025250    200200   22.5300  147.9900       7.9        82       841        90
VIS    2025250    200200   22.5400  147.9300       8.6        81       852        91
VIS    2025250    200200   22.5300  147.9000       9.7        86       858        91
VIS    2025250    200200   22.5400  147.9000       9.5        85       856        91
VIS    2025250    200200   22.5300  147.8500       7.6        83       890        92
VIS    2025250    200200   22.5300  147.8500       7.5        82       890        91
VIS    2025250    200200   22.5200  147.5900       9.0        83       989        96
VIS    2025250    200200   22.5200  147.5900       8.6        84       989        97
VIS    2025250    200200   22.5400  147.5600       8.1        87       985        93
VIS    2025250    200200   22.5300  147.5200       8.1        89       927        95
VIS    2025250    200200   22.5200  147.4900       7.3        89       968        95
VIS    2025250    200200   22.5300  147.4900       7.0        88       964        94
VIS    2025250    200200   22.5200  147.4500       8.6        91       978        97
VIS    2025250    200200   22.5200  147.4100       9.6        94       976        96
VIS    2025250    200200   22.5200  147.4000       9.8        95       974        95
VIS    2025250    200200   22.5200  147.3800      10.0        98       958        94
VIS    2025250    200200   22.5300  147.3600       9.9        99       959        95
VIS    2025250    200200   22.5100  147.3200       9.2        92       959        94
VIS    2025250    200200   22.5300  147.2900       8.6        89       966        95
VIS    2025250    200200   22.5100  147.2800       8.1        82       962        96
VIS    2025250    200200   22.5100  147.2400       9.8        87       970        97
VIS    2025250    200200   22.5100  147.2300       9.9        88       970        98
VIS    2025250    200200   22.5200  147.2000       9.8        94       976        96
VIS    2025250    200200   22.5100  147.1600      10.0        94       972        97
VIS    2025250    200200   22.5200  147.1500      10.1        93       976        96
VIS    2025250    200200   22.5100  147.1000       9.1        82       997        91
VIS    2025250    200200   22.5100  147.0400       8.2        86       955        94
VIS    2025250    200200   22.5200  147.0100       8.9        90       948        96
VIS    2025250    200200   22.5100  147.0000       9.5        91       948        97
VIS    2025250    200200   22.5000  144.5000      11.9        94       994        93
VIS    2025250    200200   22.4900  144.4800      11.9        94       994        98
VIS    2025250    200200   22.4800  144.4600      12.3        95       987        97
VIS    2025250    200200   22.4900  144.4300      12.0        95       974        98
VIS    2025250    200200   22.4900  144.4200      11.9        95       985        98
VIS    2025250    200200   22.5000  144.3900      12.6        95       981        92
VIS    2025250    200200   22.4800  144.3700      12.6        93       970        92
VIS    2025250    200200   22.4900  144.3100      12.9        95       945        97
VIS    2025250    200200   22.4900  144.2900      12.4        95       941        98
VIS    2025250    200200   22.4900  144.2600      11.7        98       942        97
VIS    2025250    200200   22.4800  144.2400      11.8        99       947        96
VIS    2025250    200200   22.4900  144.2200      12.2        98       947        96
VIS    2025250    200200   22.5000  144.1900      11.4        96       972        97
VIS    2025250    200200   22.4900  144.1600      12.3        94       968        99
VIS    2025250    200200   22.5000  144.1400      12.7        97       976        97
VIS    2025250    200200   22.4900  144.1100      12.4        99       947        97
VIS    2025250    200200   22.4900  144.0900      12.2        99       947        97
VIS    2025250    200200   22.4900  144.0600      11.8        95       947        99
VIS    2025250    200200   22.4900  144.0300      12.2        93       946        99
VIS    2025250    200200   22.5000  144.0100      12.6        95       953        98
VIS    2025250    200200   22.4900  144.0000      12.4        93       949        99
VIS    2025250    200200   22.4900  143.9700      12.0        95       949        99
VIS    2025250    200200   22.5000  143.9400      12.2        99       976        97
VIS    2025250    200200   22.4800  143.9100      11.4       101       975        96
VIS    2025250    200200   22.4800  143.8900      10.6        99       979        97
VIS    2025250    200200   22.4800  143.8700      10.6        93       966        97
VIS    2025250    200200   22.4800  143.8500      10.7        87       966        99
VIS    2025250    200200   22.4900  143.3600      12.2        94       963        98
VIS    2025250    200200   22.4800  143.3400      11.7        94       948        99
VIS    2025250    200200   22.5000  143.2600      10.9        94       954        90
VIS    2025250    200200   22.4800  143.2100      11.4        82       928        97
VIS    2025250    200200   22.4900  143.1900      11.1        88       921        97
VIS    2025250    200200   22.4800  143.1600      11.6        93       923        98
VIS    2025250    200200   22.4900  143.1400      11.4        92       921        98
VIS    2025250    200200   22.4900  143.1200      11.4        91       922        99
VIS    2025250    200200   22.4800  143.0800      11.2        94       927        97
VIS    2025250    200200   22.5700  151.6600       6.7        85       983        94
VIS    2025250    200200   22.5600  151.6300       7.4        89       981        91
VIS    2025250    200200   22.5500  151.6300       7.2        90       981        90
VIS    2025250    200200   22.5500  151.5300       7.5        81       961        91
VIS    2025250    200200   22.5500  151.5200       7.5        81       961        91
VIS    2025250    200200   22.5600  151.4900       6.8        83       977        94
VIS    2025250    200200   22.5700  151.4600       7.1        90       975        90
VIS    2025250    200200   22.5700  151.4300       7.7        88       950        91
VIS    2025250    200200   22.5500  151.4200       7.4        85       946        92
VIS    2025250    200200   22.5700  151.3900       5.7        91       888        98
VIS    2025250    200200   22.5600  151.3500       5.1       101       859       100
VIS    2025250    200200   22.5500  151.3300       4.9        96       864        98
VIS    2025250    200200   22.5300  150.3400       9.3       106       940        90
VIS    2025250    200200   22.5300  150.3100       9.5       105       904        93
VIS    2025250    200200   22.5300  150.2700       9.3       100       888        96
VIS    2025250    200200   22.5300  150.2300       9.6       103       897        99
VIS    2025250    200200   22.5300  150.2300       9.5       104       897        99
VIS    2025250    200200   22.5300  150.2000       8.7       104       883        99
VIS    2025250    200200   22.5300  150.1700       8.7        98       879        98
VIS    2025250    200200   22.5300  150.1300       8.4        95       875        97
VIS    2025250    200200   22.5400  150.1100       8.1        94       872        96
VIS    2025250    200200   22.5300  150.1000       7.5        88       875        91
VIS    2025250    200200   22.5500  150.0500       7.6        92       875        93
VIS    2025250    200200   22.5300  150.0100       7.2        91       899        92
VIS    2025250    200200   22.5300  149.7700       7.8        94       978        91
VIS    2025250    200200   22.5300  149.7500       7.8        94       927        98
VIS    2025250    200200   22.5200  149.7400       7.8        94       927        98
VIS    2025250    200200   22.5100  148.8600       9.6        89       970        98
VIS    2025250    200200   22.5100  148.8300      10.0        86       944        98
VIS    2025250    200200   22.5100  148.8000      10.3        85       896        93
VIS    2025250    200200   22.5300  148.7700       9.8        88       879        94
VIS    2025250    200200   22.5200  148.7700       9.8        89       877        94
VIS    2025250    200200   22.5300  148.7400       9.5        92       881        96
VIS    2025250    200200   22.5200  148.7100       9.2        91       881        98
VIS    2025250    200200   22.5200  148.6800       9.4        86       881        97
VIS    2025250    200200   22.5300  148.6500      10.0        90       891        97
VIS    2025250    200200   22.5300  148.6300      10.3        93       896        97
VIS    2025250    200200   22.5200  148.5900      10.2        90       880        96
VIS    2025250    200200   22.5300  148.5800       9.8        89       880        97
VIS    2025250    200200   22.5100  148.5600       8.8        85       880        97
VIS    2025250    200200   22.5300  148.5300       8.0        83       883        97
VIS    2025250    200200   22.5300  148.5100       7.5        84       883        97
VIS    2025250    200200   22.5200  148.4800       7.7        83       879        94
VIS    2025250    200200   22.5200  148.4600       7.9        83       878        95
VIS    2025250    200200   22.5000  148.4100       7.0        72       885        93
VIS    2025250    200200   22.5000  148.4100       6.9        72       893        93
VIS    2025250    200200   22.5200  148.3700       8.3        82       897        97
VIS    2025250    200200   22.5000  148.3600       8.5        83       896        98
VIS    2025250    200200   22.5200  148.3300       9.4        83       897        97
VIS    2025250    200200   22.5000  148.3000       9.6        87       896        97
VIS    2025250    200200   22.5100  148.2800       9.5        92       895        97
VIS    2025250    200200   22.5200  148.2400      10.1        99       896        95
VIS    2025250    200200   22.5100  148.2100      10.3       101       828        93
VIS    2025250    200200   22.5200  148.2100      10.0       100       828        92
VIS    2025250    200200   22.5100  148.1500       8.4        88       806        90
VIS    2025250    200200   22.5000  148.1100       8.1        86       814        92
VIS    2025250    200200   22.5000  148.0800       8.0        85       825        92
VIS    2025250    200200   22.5000  148.0600       7.7        84       829        92
VIS    2025250    200200   22.5200  148.0300       8.1        84       831        92
VIS    2025250    200200   22.5100  148.0200       8.0        83       841        91
VIS    2025250    200200   22.5200  147.9900       8.0        81       841        90
VIS    2025250    200200   22.5100  147.9600       8.1        82       850        90
VIS    2025250    200200   22.5100  147.9500       8.1        82       850        91
VIS    2025250    200200   22.5200  147.9100       9.5        84       858        90
VIS    2025250    200200   22.5200  147.9000       9.6        85       860        90
VIS    2025250    200200   22.5000  147.8600       8.0        83       875        91
VIS    2025250    200200   22.5100  147.8400       6.9        83       902        93
VIS    2025250    200200   22.5100  147.5900       8.9        84       989        97
VIS    2025250    200200   22.5000  147.5700       8.5        88       984        97
VIS    2025250    200200   22.5100  147.5200       8.4        92       936        95
VIS    2025250    200200   22.5100  147.5000       8.0        88       968        95
VIS    2025250    200200   22.5000  147.4600       9.0        89       976        98
VIS    2025250    200200   22.5100  147.4400       9.4        92       976        98
VIS    2025250    200200   22.4900  147.4200       9.6        93       953        96
VIS    2025250    200200   22.5000  147.3800      10.1        97       952        92
VIS    2025250    200200   22.5000  147.3800      10.0        97       952        92
VIS    2025250    200200   22.5000  147.3500       9.4        97       951        91
VIS    2025250    200200   22.4900  147.3200       8.0        89       951        94
VIS    2025250    200200   22.5100  147.2900       8.1        81       959        95
VIS    2025250    200200   22.4900  147.2500       9.5        85       921       100
VIS    2025250    200200   22.4900  147.2400       9.6        85       924        99
VIS    2025250    200200   22.4900  147.2200       9.4        88       942        98
VIS    2025250    200200   22.4900  147.1800       9.9        93       956        97
VIS    2025250    200200   22.4900  147.1500      10.2        93       966        97
VIS    2025250    200200   22.4900  147.1400       9.7        90       969        95
VIS    2025250    200200   22.4900  147.1100       8.7        86       968        92
VIS    2025250    200200   22.4900  147.0800       9.1        86       953        97
VIS    2025250    200200   22.4900  147.0600       8.8        86       955        96
VIS    2025250    200200   22.4900  147.0400       8.5        87       934        96
VIS    2025250    200200   22.4900  147.0100       8.6        91       934        95
VIS    2025250    200200   22.5000  146.9800      10.3        91       948        98
VIS    2025250    200200   22.4900  146.9400      10.9        89       994        99
VIS    2025250    200200   22.4800  144.4700      12.5        94       994        97
VIS    2025250    200200   22.4800  144.4500      12.5        94       977        97
VIS    2025250    200200   22.4800  144.4200      12.5        94       971        98
VIS    2025250    200200   22.4700  144.4000      12.6        94       970        98
VIS    2025250    200200   22.4800  144.3800      12.7        93       968        92
VIS    2025250    200200   22.4600  144.3500      13.0        92       968        93
VIS    2025250    200200   22.4600  144.3300      12.8        92       954        97
VIS    2025250    200200   22.4600  144.3000      12.8        92       938        99
VIS    2025250    200200   22.4600  144.2700      12.1        97       934        98
VIS    2025250    200200   22.4800  144.2400      11.8        99       942        97
VIS    2025250    200200   22.4600  144.2300      12.1        97       922        98
VIS    2025250    200200   22.4700  144.2100      12.5        93       926        97
VIS    2025250    200200   22.4700  144.1700      12.4        93       928        99
VIS    2025250    200200   22.4600  144.1500      12.2        93       927        99
VIS    2025250    200200   22.4800  144.1300      12.3        96       931        98
VIS    2025250    200200   22.4800  144.1000      12.0        97       928        98
VIS    2025250    200200   22.4600  144.0700      11.7        93       925        99
VIS    2025250    200200   22.4700  144.0400      11.8        94       930        99
VIS    2025250    200200   22.4800  144.0300      11.9        93       946        99
VIS    2025250    200200   22.4800  144.0000      12.1        93       926        99
VIS    2025250    200200   22.4800  143.9800      12.2        94       930        99
VIS    2025250    200200   22.4600  143.9500      12.4        98       944        97
VIS    2025250    200200   22.4500  143.9100      11.7        98       928        97
VIS    2025250    200200   22.4500  143.9000      11.6        98       928        97
VIS    2025250    200200   22.4700  143.8600      11.0        89       966        99
VIS    2025250    200200   22.4700  143.8600      10.9        88       966        99
VIS    2025250    200200   22.4600  143.8300      11.9        87       966        93
VIS    2025250    200200   22.4600  143.3900      13.0        95       985        97
VIS    2025250    200200   22.4700  143.3700      12.5        93       969        98
VIS    2025250    200200   22.4700  143.2300      12.2        78       975        91
VIS    2025250    200200   22.4700  143.1900      12.4        86       928        97
VIS    2025250    200200   22.4600  143.1800      12.5        86       934        96
VIS    2025250    200200   22.4500  143.1500      11.8        92       934        99
VIS    2025250    200200   22.5300  151.7000       6.8        86       979        95
VIS    2025250    200200   22.5300  151.7000       6.7        88       979        96
VIS    2025250    200200   22.5500  151.6500       7.5        86       966        94
VIS    2025250    200200   22.5500  151.6400       7.5        87       969        92
VIS    2025250    200200   22.5300  151.6000       6.0        87       981        98
VIS    2025250    200200   22.5300  151.5900       5.6        85       981        96
VIS    2025250    200200   22.5300  151.5600       5.6        83       952        95
VIS    2025250    200200   22.5300  151.5400       6.2        84       949        93
VIS    2025250    200200   22.5300  151.5200       6.4        84       949        91
VIS    2025250    200200   22.5500  151.4800       6.2        87       977        96
VIS    2025250    200200   22.5300  151.4400       6.6        93       951        93
VIS    2025250    200200   22.5200  151.4200       6.2        93       930        91
VIS    2025250    200200   22.5300  151.4000       6.1        89       898        92
VIS    2025250    200200   22.5300  151.3900       5.2        94       887        98
VIS    2025250    200200   22.5300  151.3500       4.0        99       877        98
VIS    2025250    200200   22.5100  150.5400       8.9        96       968        90
VIS    2025250    200200   22.5100  150.3800       8.3       115       947        90
VIS    2025250    200200   22.5100  150.3600       9.3       114       908        91
VIS    2025250    200200   22.5300  150.3000       9.4       106       892        95
VIS    2025250    200200   22.5100  150.2800       9.5       104       887        96
VIS    2025250    200200   22.5100  150.2600       9.6       102       888        95
VIS    2025250    200200   22.5100  150.2400       9.6       104       911        95
VIS    2025250    200200   22.5200  150.2200       9.4       105       899        99
VIS    2025250    200200   22.5000  150.1700       8.6       102       879        99
VIS    2025250    200200   22.5000  150.1500       8.7       101       874        99
VIS    2025250    200200   22.5100  150.1400       8.6        97       872        98
VIS    2025250    200200   22.5200  150.0400       7.6        91       887        92
VIS    2025250    200200   22.5200  150.0200       7.4        91       888        93
VIS    2025250    200200   22.5100  150.0100       7.3        90       894        94
VIS    2025250    200200   22.5200  149.7400       7.8        94       927        98
VIS    2025250    200200   22.5000  148.8800       9.9        92       969        98
VIS    2025250    200200   22.4800  148.8600      10.0        91       961        98
VIS    2025250    200200   22.5000  148.8300      10.0        86       944        98
VIS    2025250    200200   22.4800  148.8200      10.2        87       906        95
VIS    2025250    200200   22.4800  148.7800      10.2        85       885        93
VIS    2025250    200200   22.5000  148.7700       9.9        87       876        93
VIS    2025250    200200   22.5000  148.7500       9.5        90       880        95
VIS    2025250    200200   22.5000  148.7000       9.0        89       881        98
VIS    2025250    200200   22.4800  148.6800       9.3        92       882        98
VIS    2025250    200200   22.4800  148.6600       9.9        92       885        97
VIS    2025250    200200   22.4800  148.6400      10.7        90       901        95
VIS    2025250    200200   22.4800  148.6200      11.2        89       894        93
VIS    2025250    200200   22.5000  148.5900      10.4        90       880        95
VIS    2025250    200200   22.4900  148.5500       8.2        89       880        99
VIS    2025250    200200   22.4800  148.5200       7.7        88       881        99
VIS    2025250    200200   22.4900  148.5100       7.7        83       881        96
VIS    2025250    200200   22.5000  148.4900       7.8        80       881        94
VIS    2025250    200200   22.4800  148.4400       7.8        78       885        95
VIS    2025250    200200   22.4900  148.4200       7.0        71       893        93
VIS    2025250    200200   22.5000  148.4100       6.9        71       893        93
VIS    2025250    200200   22.4900  148.3800       7.5        80       902        96
VIS    2025250    200200   22.4900  148.3600       8.5        83       896        97
VIS    2025250    200200   22.4900  148.3300       9.5        83       894        96
VIS    2025250    200200   22.5000  148.3100       9.6        86       896        97
VIS    2025250    200200   22.5000  148.2800       9.7        94       895        97
VIS    2025250    200200   22.4800  148.2500      10.9        95       890        95
VIS    2025250    200200   22.5000  148.2200      10.9       102       817        93
VIS    2025250    200200   22.4900  148.2000       9.9        97       812        92
VIS    2025250    200200   22.4900  148.1200       8.1        84       814        92
VIS    2025250    200200   22.4700  148.0900       8.1        83       819        91
VIS    2025250    200200   22.4800  148.0800       7.9        83       823        92
VIS    2025250    200200   22.4800  148.0500       7.7        84       831        91
VIS    2025250    200200   22.4800  148.0300       7.7        84       841        90
VIS    2025250    200200   22.4800  147.9800       8.4        81       845        90
VIS    2025250    200200   22.4900  147.9400       8.7        83       856        90
VIS    2025250    200200   22.4900  147.9200       8.8        82       858        90
VIS    2025250    200200   22.4700  147.9000       8.7        82       860        90
VIS    2025250    200200   22.4900  147.8600       8.3        82       872        92
VIS    2025250    200200   22.4900  147.8500       8.1        82       872        92
VIS    2025250    200200   22.4800  147.8300       7.6        85       877        92
VIS    2025250    200200   22.4800  147.6000       9.2        83       992        98
VIS    2025250    200200   22.4700  147.5800       8.4        85       992        95
VIS    2025250    200200   22.4900  147.5600       8.4        89       981        96
VIS    2025250    200200   22.4700  147.5300       8.4        93       974        96
VIS    2025250    200200   22.4700  147.5200       8.3        89       966        97
VIS    2025250    200200   22.4700  147.4700       8.0        83       960        95
VIS    2025250    200200   22.4800  147.4500       9.4        91       960        98
VIS    2025250    200200   22.4900  147.4300       9.6        93       953        98
VIS    2025250    200200   22.4900  147.4200       9.6        93       953        95
VIS    2025250    200200   22.4600  147.3900       9.3        91       934        95
VIS    2025250    200200   22.4700  147.3500       9.0        94       948        95
VIS    2025250    200200   22.4600  147.3200       7.0        86       940        92
VIS    2025250    200200   22.4800  147.2900       7.3        81       940        94
VIS    2025250    200200   22.4800  147.2700       8.4        85       911        97
VIS    2025250    200200   22.4800  147.2600       9.4        86       911        99
VIS    2025250    200200   22.4600  147.2400       9.4        89       904        99
VIS    2025250    200200   22.4600  147.2100       8.9        88       924        98
VIS    2025250    200200   22.4800  147.1800       9.9        93       956        97
VIS    2025250    200200   22.4800  147.1500      10.0        92       964        97
VIS    2025250    200200   22.4600  147.1100       8.7        88       942        93
VIS    2025250    200200   22.4600  147.1000       9.0        87       932        95
VIS    2025250    200200   22.4700  147.0800       9.3        85       932        96
VIS    2025250    200200   22.4800  147.0500       8.7        86       934        96
VIS    2025250    200200   22.4800  147.0200       8.5        90       934        96
VIS    2025250    200200   22.4600  146.9900       9.9        95       938        94
VIS    2025250    200200   22.4600  146.9800      10.5        94       953        94
VIS    2025250    200200   22.4600  146.9600      10.7        90       975        94
VIS    2025250    200200   22.4500  145.0000      11.9        90       998       100
VIS    2025250    200200   22.4500  144.9900      12.0        90       998       100
VIS    2025250    200200   22.4400  144.7200      13.1        93      1000        96
VIS    2025250    200200   22.4400  144.7100      13.0        93      1000        98
VIS    2025250    200200   22.4300  144.5400      14.0        90       991        97
VIS    2025250    200200   22.4300  144.5100      14.0        88       989        97
VIS    2025250    200200   22.4500  144.4800      14.9        93       989        91
VIS    2025250    200200   22.4400  144.4400      14.5        95       974        94
VIS    2025250    200200   22.4400  144.4200      13.5        95       971        95
VIS    2025250    200200   22.4300  144.3800      13.3        93       966        97
VIS    2025250    200200   22.4500  144.3800      13.0        94       968        95
VIS    2025250    200200   22.4500  144.3500      13.2        91       958        96
VIS    2025250    200200   22.4400  144.3100      13.3        89       938        99
VIS    2025250    200200   22.4500  144.2800      12.6        93       934        99
VIS    2025250    200200   22.4400  144.2700      12.3        94       933        99
VIS    2025250    200200   22.4500  144.2400      12.0        98       922        98
VIS    2025250    200200   22.4400  144.2200      12.5        96       920        99
VIS    2025250    200200   22.4400  144.1800      12.5        94       922        98
VIS    2025250    200200   22.4400  144.1700      12.6        93       922        98
VIS    2025250    200200   22.4500  144.1300      12.1        92       922       100
VIS    2025250    200200   22.4500  144.1100      11.7        92       924       100
VIS    2025250    200200   22.4500  144.0800      11.7        93       923        99
VIS    2025250    200200   22.4500  144.0700      11.7        93       925        99
VIS    2025250    200200   22.4300  144.0400      12.1        92       921       100
VIS    2025250    200200   22.4400  144.0000      11.9        90       921       100
VIS    2025250    200200   22.4400  144.0000      12.0        91       921       100
VIS    2025250    200200   22.4300  143.9700      12.1        94       923        99
VIS    2025250    200200   22.4300  143.9400      12.1        95       923        98
VIS    2025250    200200   22.4500  143.9000      11.7        97       926        98
VIS    2025250    200200   22.4500  143.9000      11.5        96       926        98
VIS    2025250    200200   22.4300  143.8600      11.8        89       925       100
VIS    2025250    200200   22.4300  143.8300      11.9        89       950        97
VIS    2025250    200200   22.4300  143.8200      12.0        90       950        96
VIS    2025250    200200   22.4200  143.4100      12.9        94       985        97
VIS    2025250    200200   22.4200  143.4100      12.9        94       985        97
VIS    2025250    200200   22.4200  143.3700      12.5        94       969        96
VIS    2025250    200200   22.4400  143.2200      13.6        82       975        94
VIS    2025250    200200   22.4400  143.1500      11.8        92       934        99
VIS    2025250    200200   22.4200  142.8500      10.0        93      1000       100
VIS    2025250    200200   22.4200  142.8300      10.1        97       976        97
VIS    2025250    200200   22.4300  142.8100       9.7        97       983        97
VIS    2025250    200200   22.4300  142.7900       9.3        95       983        98
VIS    2025250    200200   22.4200  142.7600       9.2        91       983        99
VIS    2025250    200200   22.5100  151.8800       6.8        90       986        90
VIS    2025250    200200   22.5100  151.8400       6.6        79       981        91
VIS    2025250    200200   22.5200  151.7900       7.3        92       965        90
VIS    2025250    200200   22.5100  151.7500       7.8        92       961        91
VIS    2025250    200200   22.5200  151.7400       7.8        88       954        91
VIS    2025250    200200   22.5200  151.7000       6.5        85       972        95
VIS    2025250    200200   22.5100  151.6900       5.8        89       957        97
VIS    2025250    200200   22.5200  151.6400       7.6        90       962        91
VIS    2025250    200200   22.5200  151.6400       7.1        90       962        91
VIS    2025250    200200   22.5200  151.6000       5.6        88       969        99
VIS    2025250    200200   22.5100  151.5900       5.2        88       952        99
VIS    2025250    200200   22.5000  151.5500       6.1        89       945        98
VIS    2025250    200200   22.5000  151.5200       6.0        91       945        98
VIS    2025250    200200   22.5000  151.5100       5.9        92       945        96
VIS    2025250    200200   22.5100  151.4600       6.1        94       972        98
VIS    2025250    200200   22.5100  151.4600       6.0        95       962        96
VIS    2025250    200200   22.5000  151.4200       5.5        98       886        94
VIS    2025250    200200   22.5100  151.4000       5.6        97       886        92
VIS    2025250    200200   22.5100  151.3700       4.7        98       859        95
VIS    2025250    200200   22.5000  150.5400       8.7        95       968        91
VIS    2025250    200200   22.4800  150.5000       8.0       104       958        94
VIS    2025250    200200   22.4900  150.4800       8.4       108       965        91
VIS    2025250    200200   22.5000  150.3500       9.8       116       899        90
VIS    2025250    200200   22.4900  150.3400      10.2       116       885        90
VIS    2025250    200200   22.4900  150.3100      10.3       114       871        94
VIS    2025250    200200   22.5000  150.2700       9.6       105       887        96
VIS    2025250    200200   22.5000  150.2400       9.3       103       930        91
VIS    2025250    200200   22.5000  150.1900       8.1       103       911       100
VIS    2025250    200200   22.5000  150.1700       8.5       101       879        99
VIS    2025250    200200   22.5000  150.1500       8.6       101       874        99
VIS    2025250    200200   22.5000  150.0400       8.1        88       893        93
VIS    2025250    200200   22.4600  148.9100      10.7        98       945        96
VIS    2025250    200200   22.4600  148.8900      10.5        96       945        97
VIS    2025250    200200   22.4700  148.8600      10.1        92       945        98
VIS    2025250    200200   22.4600  148.8300      10.1        92       897        94
VIS    2025250    200200   22.4800  148.8100      10.2        88       906        95
VIS    2025250    200200   22.4700  148.7900      10.3        88       885        93
VIS    2025250    200200   22.4700  148.7700      10.2        87       881        93
VIS    2025250    200200   22.4600  148.7500      10.0        87       880        96
VIS    2025250    200200   22.4700  148.7100       8.9        88       882        98
VIS    2025250    200200   22.4600  148.7000       9.3        90       884        98
VIS    2025250    200200   22.4800  148.6700       9.7        92       884        98
VIS    2025250    200200   22.4800  148.6500      10.7        91       901        96
VIS    2025250    200200   22.4700  148.6200      11.2        89       894        93
VIS    2025250    200200   22.4500  148.5800      10.0        91       880        97
VIS    2025250    200200   22.4600  148.5500       8.6        90       880        99
VIS    2025250    200200   22.4700  148.5400       8.0        89       880        99
VIS    2025250    200200   22.4700  148.5000       7.8        84       880        97
VIS    2025250    200200   22.4600  148.5000       7.8        84       880        97
VIS    2025250    200200   22.4600  148.4500       8.0        81       892        96
VIS    2025250    200200   22.4500  148.4400       8.0        79       897        96
VIS    2025250    200200   22.4600  148.4100       7.6        79       902        95
VIS    2025250    200200   22.4600  148.3800       7.9        83       897        96
VIS    2025250    200200   22.4700  148.3700       8.3        84       894        97
VIS    2025250    200200   22.4500  148.3300       9.4        84       892        97
VIS    2025250    200200   22.4600  148.3100       9.5        83       892        96
VIS    2025250    200200   22.4500  148.2900       9.6        85       892        97
VIS    2025250    200200   22.4500  148.2600      10.6        87       892        95
VIS    2025250    200200   22.4500  148.0900       9.2        82       823        90
VIS    2025250    200200   22.4700  148.0700       8.3        83       823        91
VIS    2025250    200200   22.4600  147.9900       8.0        80       845        90
VIS    2025250    200200   22.4600  147.9400       9.5        83       858        91
VIS    2025250    200200   22.4600  147.9200       9.5        84       858        90
VIS    2025250    200200   22.4500  147.8800       9.3        84       854        90
VIS    2025250    200200   22.4500  147.8600       9.4        84       854        91
VIS    2025250    200200   22.4500  147.8300       8.7        84       862        91
VIS    2025250    200200   22.4500  147.8100       8.4        86       883        94
VIS    2025250    200200   22.4400  147.7800       8.5        89       918        98
VIS    2025250    200200   22.4600  147.5900       8.5        84       992        96
VIS    2025250    200200   22.4500  147.5600       8.2        94       990        95
VIS    2025250    200200   22.4600  147.5400       8.4        94       974        96
VIS    2025250    200200   22.4500  147.5000       7.6        84       964        95
VIS    2025250    200200   22.4600  147.4900       7.4        82       960        95
VIS    2025250    200200   22.4600  147.4700       7.8        84       960        95
VIS    2025250    200200   22.4600  147.4400       9.5        92       941        98
VIS    2025250    200200   22.4400  147.4000       9.3        89       924        99
VIS    2025250    200200   22.4500  147.3900       9.2        89       932        98
VIS    2025250    200200   22.4400  147.3500       9.0        90       921        98
VIS    2025250    200200   22.4400  147.3500       8.8        90       921        98
VIS    2025250    200200   22.4500  147.3200       7.6        87       917        95
VIS    2025250    200200   22.4400  147.2700       9.2        90       867        95
VIS    2025250    200200   22.4400  147.2700       9.4        91       867        95
VIS    2025250    200200   22.4500  147.2300       9.1        89       904        99
VIS    2025250    200200   22.4500  147.2200       9.1        89       924        98
VIS    2025250    200200   22.4500  147.1800      10.0        91       956        98
VIS    2025250    200200   22.4400  147.1500       9.8        91       934        97
VIS    2025250    200200   22.4500  147.1300       9.2        88       934        96
VIS    2025250    200200   22.4600  147.1100       8.8        88       942        93
VIS    2025250    200200   22.4600  147.0900       9.3        87       927        95
VIS    2025250    200200   22.4400  147.0500       9.9        92       889        96
VIS    2025250    200200   22.4600  147.0400       9.6        95       901        95
VIS    2025250    200200   22.4400  147.0000      10.5        96       933        97
VIS    2025250    200200   22.4300  146.9700      11.8        92       938        98
VIS    2025250    200200   22.4300  146.9700      11.7        91       939        98
VIS    2025250    200200   22.4300  146.9300      11.4        86       964        99
VIS    2025250    200200   22.4200  145.4800      12.6        89       977       100
VIS    2025250    200200   22.4200  145.4800      12.6        90       975        99
VIS    2025250    200200   22.4200  145.1800      11.3        87       998        98
VIS    2025250    200200   22.4200  145.1500      12.8        87       996        99
VIS    2025250    200200   22.4100  145.1300      13.7        87       960        99
VIS    2025250    200200   22.4100  145.1200      14.4        88       964        98
VIS    2025250    200200   22.4200  145.0800      12.4        87       985        95
VIS    2025250    200200   22.4300  145.0300      13.3        86       997        99
VIS    2025250    200200   22.4200  145.0000      12.8        85       964        99
VIS    2025250    200200   22.4200  144.9900      12.7        87       979        99
VIS    2025250    200200   22.4100  144.8300      14.9        99       992        94
VIS    2025250    200200   22.4100  144.8000      14.0        92      1000        96
VIS    2025250    200200   22.4200  144.7700      13.5        96       978        97
VIS    2025250    200200   22.4100  144.7400      12.9        95       978        98
VIS    2025250    200200   22.4100  144.7100      12.8        92       977        98
VIS    2025250    200200   22.4100  144.6900      12.9        93       977        98
VIS    2025250    200200   22.4100  144.5600      14.5        92       991        96
VIS    2025250    200200   22.4100  144.5500      14.2        90       991        97
VIS    2025250    200200   22.4300  144.5200      13.9        87       991        98
VIS    2025250    200200   22.4100  144.4900      14.9        90       967        95
VIS    2025250    200200   22.4200  144.4700      15.4        93       967        92
VIS    2025250    200200   22.4200  144.4300      14.0        94       949        96
VIS    2025250    200200   22.4200  144.4200      13.5        93       952        97
VIS    2025250    200200   22.4200  144.3800      13.4        92       966        98
VIS    2025250    200200   22.4300  144.3500      13.7        90       962        97
VIS    2025250    200200   22.4300  144.3500      13.7        89       954        97
VIS    2025250    200200   22.4100  144.3000      12.8        89       933        98
VIS    2025250    200200   22.4300  144.2900      12.8        89       934        99
VIS    2025250    200200   22.4300  144.2600      12.1        96       923        99
VIS    2025250    200200   22.4300  144.2300      12.5        96       920        98
VIS    2025250    200200   22.4100  144.2200      12.7        92       920        96
VIS    2025250    200200   22.4200  144.1800      12.3        94       921        98
VIS    2025250    200200   22.4300  144.1600      12.5        93       921        98
VIS    2025250    200200   22.4200  144.1400      12.8        91       921        99
VIS    2025250    200200   22.4200  144.1000      11.8        91       923       100
VIS    2025250    200200   22.4200  144.0900      11.7        91       923       100
VIS    2025250    200200   22.4200  144.0600      12.0        92       922        99
VIS    2025250    200200   22.4200  144.0300      12.0        91       921       100
VIS    2025250    200200   22.4000  144.0100      11.9        94       921        99
VIS    2025250    200200   22.4200  143.9800      12.0        94       923        99
VIS    2025250    200200   22.4000  143.9600      11.5        93       929        99
VIS    2025250    200200   22.4000  143.9500      11.6        91       929       100
VIS    2025250    200200   22.4200  143.9100      11.7        94       923        99
VIS    2025250    200200   22.4200  143.9000      11.7        93       923       100
VIS    2025250    200200   22.4100  143.8700      11.8        93       924        99
VIS    2025250    200200   22.4000  143.8200      11.1        92       950        97
VIS    2025250    200200   22.4200  143.4500      13.2        92       989        97
VIS    2025250    200200   22.4200  143.4200      12.9        93       982        97
VIS    2025250    200200   22.4100  142.8600       9.1        89       985        98
VIS    2025250    200200   22.3900  142.8500       9.3        89       974        98
VIS    2025250    200200   22.4000  142.8200      10.3        95       974        95
VIS    2025250    200200   22.3900  142.7900       9.9        96       949        97
VIS    2025250    200200   22.4100  142.7600       9.2        93       973        98
VIS    2025250    200200   22.3900  142.7300       9.4        91       963        98
VIS    2025250    200200   22.5000  151.8800       7.1        88       986        95
VIS    2025250    200200   22.4800  151.8600       7.0        87       978        95
VIS    2025250    200200   22.4800  151.8300       6.7        80       955        93
VIS    2025250    200200   22.4800  151.8100       6.8        78       955        90
VIS    2025250    200200   22.4800  151.7900       6.6        80       960        92
VIS    2025250    200200   22.4900  151.7500       7.5        91       960        93
VIS    2025250    200200   22.4800  151.7200       6.4        86       933        97
VIS    2025250    200200   22.4800  151.7100       6.1        87       933        98
VIS    2025250    200200   22.4800  151.6800       6.2        91       938        98
VIS    2025250    200200   22.4800  151.6600       6.7        88       950        95
VIS    2025250    200200   22.4800  151.6200       5.7        91       950        92
VIS    2025250    200200   22.4900  151.6100       5.3        91       950        98
VIS    2025250    200200   22.4700  151.5600       6.3        92       938        98
VIS    2025250    200200   22.4700  151.5500       6.2        94       938        99
VIS    2025250    200200   22.4900  151.5200       6.1        93       939        98
VIS    2025250    200200   22.4900  151.5100       6.0        92       939        95
VIS    2025250    200200   22.4800  151.4700       6.4        99       932        97
VIS    2025250    200200   22.4900  151.4400       5.3       100       901        98
VIS    2025250    200200   22.4900  151.4200       5.0        99       868        95
VIS    2025250    200200   22.4800  151.3400       4.0       102       863        98
VIS    2025250    200200   22.4600  150.5100       8.2       101       947        94
VIS    2025250    200200   22.4800  150.4900       8.0       105       958        94
VIS    2025250    200200   22.4600  150.4600       8.2       106       964        92
VIS    2025250    200200   22.4500  150.3500       9.7       116       892        92
VIS    2025250    200200   22.4700  150.3400      10.1       115       871        94
VIS    2025250    200200   22.4600  150.3000      10.4       114       862        95
VIS    2025250    200200   22.4600  150.2900      10.4       113       864        96
VIS    2025250    200200   22.4600  150.2100       7.5        95       964        94
VIS    2025250    200200   22.4600  150.1700       8.2        98       933        98
VIS    2025250    200200   22.4700  150.1600       8.5        98       911        99
VIS    2025250    200200   22.4500  150.1300       8.9        93       885        94
VIS    2025250    200200   22.4500  149.8300       7.8        98       989        91
VIS    2025250    200200   22.4500  149.8100       8.0        98       979        91
VIS    2025250    200200   22.4500  149.7600       8.1       100       959        94
VIS    2025250    200200   22.4500  149.7600       8.1       101       959        98
VIS    2025250    200200   22.4300  148.9400       9.8        94       969        98
VIS    2025250    200200   22.4500  148.9200      10.5        97       944        96
VIS    2025250    200200   22.4500  148.9100      10.6        98       944        96
VIS    2025250    200200   22.4300  148.8700      10.2        93       888        95
VIS    2025250    200200   22.4400  148.8500      10.0        92       887        94
VIS    2025250    200200   22.4400  148.8300       9.9        91       881        92
VIS    2025250    200200   22.4300  148.7900       9.7        92       874        94
VIS    2025250    200200   22.4500  148.7700      10.0        89       876        93
VIS    2025250    200200   22.4500  148.7600      10.0        88       876        96
VIS    2025250    200200   22.4400  148.7100       9.6        86       886        97
VIS    2025250    200200   22.4500  148.7100       9.3        88       884        98
VIS    2025250    200200   22.4500  148.6800       9.5        89       886        98
VIS    2025250    200200   22.4300  148.6500      10.3        85       912        97
VIS    2025250    200200   22.4300  148.6100      10.3        88       893        96
VIS    2025250    200200   22.4300  148.5900      10.0        89       880        96
VIS    2025250    200200   22.4300  148.5800       9.8        89       880        97
VIS    2025250    200200   22.4300  148.5500       8.9        88       880        97
VIS    2025250    200200   22.4400  148.5100       7.8        84       884        97
VIS    2025250    200200   22.4500  148.5000       7.8        83       884        96
VIS    2025250    200200   22.4400  148.4800       8.0        82       889        95
VIS    2025250    200200   22.4500  148.4400       8.0        80       897        96
VIS    2025250    200200   22.4300  148.4300       7.9        80       902        96
VIS    2025250    200200   22.4500  148.3800       8.5        86       892        97
VIS    2025250    200200   22.4400  148.3700       9.1        89       892        98
VIS    2025250    200200   22.4500  148.3400       9.4        85       892        97
VIS    2025250    200200   22.4500  148.3200       9.5        84       892        97
VIS    2025250    200200   22.4300  148.2900       9.7        85       892        97
VIS    2025250    200200   22.4400  148.2600      10.4        84       892        95
VIS    2025250    200200   22.4300  148.2500      10.5        83       892        94
VIS    2025250    200200   22.4300  148.1200       8.9        85       823        91
VIS    2025250    200200   22.4400  148.1000       9.3        83       823        90
VIS    2025250    200200   22.4200  147.9900       8.0        79       845        90
VIS    2025250    200200   22.4300  147.9700       8.6        79       845        90
VIS    2025250    200200   22.4400  147.9300       9.7        85       858        91
VIS    2025250    200200   22.4400  147.9100       9.7        85       858        90
VIS    2025250    200200   22.4200  147.8800       9.6        86       839        91
VIS    2025250    200200   22.4300  147.8600       9.5        85       845        91
VIS    2025250    200200   22.4200  147.8200       9.4        85       845        91
VIS    2025250    200200   22.4300  147.8100       9.0        87       877        93
VIS    2025250    200200   22.4200  147.7800       9.4        86       955        97
VIS    2025250    200200   22.4200  147.5600       9.0        93       960        97
VIS    2025250    200200   22.4200  147.5500       8.9        93       960        97
VIS    2025250    200200   22.4200  147.5300       8.7        92       960        97
VIS    2025250    200200   22.4100  147.5100       8.6        90       930        98
VIS    2025250    200200   22.4200  147.4800       8.3        92       917        98
VIS    2025250    200200   22.4300  147.4500       9.3        95       915        96
VIS    2025250    200200   22.4100  147.4100       9.4        89       903        99
VIS    2025250    200200   22.4200  147.3800       9.4        87       903        99
VIS    2025250    200200   22.4200  147.3700       9.2        87       903        99
VIS    2025250    200200   22.4200  147.3500       9.1        88       882        95
VIS    2025250    200200   22.4100  147.3200       8.7        86       879        93
VIS    2025250    200200   22.4100  147.2900       8.7        88       879        96
VIS    2025250    200200   22.4300  147.2700       9.3        90       867        95
VIS    2025250    200200   22.4300  147.2400      10.1        93       903        98
VIS    2025250    200200   22.4300  147.2300       9.7        92       904        98
VIS    2025250    200200   22.4100  147.1800       9.7        90       927        98
VIS    2025250    200200   22.4300  147.1600       9.9        92       934        98
VIS    2025250    200200   22.4300  147.1500       9.9        92       934        97
VIS    2025250    200200   22.4200  147.1300      10.3        89       898        93
VIS    2025250    200200   22.4100  147.0900      10.6        93       889        96
VIS    2025250    200200   22.4200  147.0700       9.9        92       886        96
VIS    2025250    200200   22.4300  147.0500       9.8        93       898        98
VIS    2025250    200200   22.4100  147.0200      11.1        94       910        99
VIS    2025250    200200   22.4200  146.9800      12.2        94       917        97
VIS    2025250    200200   22.4200  146.9700      12.3        94       922        98
VIS    2025250    200200   22.4300  146.9400      11.8        88       940       100
VIS    2025250    200200   22.4300  146.9200      11.4        85       975        99
VIS    2025250    200200   22.4100  146.9000      10.6        86       961        98
VIS    2025250    200200   22.4100  146.8600      10.6        85       961        99
VIS    2025250    200200   22.4000  146.4100      11.4        87       996       100
VIS    2025250    200200   22.4000  146.3900      11.5        86       997       100
VIS    2025250    200200   22.4000  146.3800      11.5        86       997       100
VIS    2025250    200200   22.4200  146.3500      13.0        88       996        97
VIS    2025250    200200   22.4100  146.2700      11.3        77       983        98
VIS    2025250    200200   22.4000  146.2600      12.1        77       983        98
VIS    2025250    200200   22.4100  145.5500      11.5        85       998        97
VIS    2025250    200200   22.4000  145.5200      12.4        89       978       100
VIS    2025250    200200   22.4100  145.4900      12.4        89       975        99
VIS    2025250    200200   22.3900  145.4700      12.8        91       975        99
VIS    2025250    200200   22.4000  145.4500      12.7        95       975        99
VIS    2025250    200200   22.3900  145.4100      14.5        99       971        95
VIS    2025250    200200   22.3900  145.3900      14.3        95       971        95
VIS    2025250    200200   22.4000  145.3800      14.3        94       984        94
VIS    2025250    200200   22.4100  145.3100      14.2        91       990        96
VIS    2025250    200200   22.3900  145.2900      14.3        90       988        98
VIS    2025250    200200   22.3900  145.2100      12.0        82       988        99
VIS    2025250    200200   22.4000  145.1900      11.9        83       988        97
VIS    2025250    200200   22.4000  145.1600      13.0        88       969        99
VIS    2025250    200200   22.4000  145.1500      13.0        88       969        99
VIS    2025250    200200   22.4000  145.1100      13.9        90       964        98
VIS    2025250    200200   22.4000  145.1000      13.7        90       964        99
VIS    2025250    200200   22.3900  145.0700      12.6        89       985        99
VIS    2025250    200200   22.4000  145.0300      13.0        85       967        99
VIS    2025250    200200   22.4100  145.0100      13.2        84       964        99
VIS    2025250    200200   22.3900  145.0000      13.5        86       936        98
VIS    2025250    200200   22.3900  144.9700      13.0        88       944        99
VIS    2025250    200200   22.4000  144.9500      12.4        89       979       100
VIS    2025250    200200   22.3900  144.9100      12.7        87       995        98
VIS    2025250    200200   22.3900  144.9000      13.0        88       991        97
VIS    2025250    200200   22.3900  144.8600      13.3        96       992        91
VIS    2025250    200200   22.3900  144.8500      13.1        98       992        93
VIS    2025250    200200   22.3900  144.8200      12.2        95       988        98
VIS    2025250    200200   22.4100  144.8000      13.6        92       992        96
VIS    2025250    200200   22.3800  144.7700      12.4        91       964        99
VIS    2025250    200200   22.4100  144.7500      12.9        95       974        98
VIS    2025250    200200   22.4000  144.7300      12.9        93       974        97
VIS    2025250    200200   22.3900  144.7000      12.7        93       968        98
VIS    2025250    200200   22.3900  144.6600      13.0        94       980        97
VIS    2025250    200200   22.3800  144.6200      13.1        92       995        96
VIS    2025250    200200   22.3900  144.5900      14.0        93       995        97
VIS    2025250    200200   22.3900  144.5600      14.3        92       991        97
VIS    2025250    200200   22.3900  144.5300      13.7        89       974        97
VIS    2025250    200200   22.4000  144.5100      14.1        87       974        98
VIS    2025250    200200   22.3900  144.5000      14.2        88       953        98
VIS    2025250    200200   22.3800  144.4800      14.5        89       946        97
VIS    2025250    200200   22.4000  144.4400      14.2        90       949        97
VIS    2025250    200200   22.3800  144.4100      13.9        91       946        97
VIS    2025250    200200   22.4000  144.3800      12.9        91       949        99
VIS    2025250    200200   22.4000  144.3600      12.6        90       942        99
VIS    2025250    200200   22.3900  144.3300      12.2        89       933        97
VIS    2025250    200200   22.3900  144.3100      12.7        89       923        97
VIS    2025250    200200   22.4000  144.3000      12.7        89       923        98
VIS    2025250    200200   22.3900  144.2600      13.3        91       920        99
VIS    2025250    200200   22.3900  144.2500      13.4        91       920        98
VIS    2025250    200200   22.3800  144.2100      12.8        91       920        97
VIS    2025250    200200   22.3900  144.2000      12.5        92       920        94
VIS    2025250    200200   22.3800  144.1700      12.1        93       920        96
VIS    2025250    200200   22.3800  144.1400      13.0        92       920        96
VIS    2025250    200200   22.3800  144.1200      13.5        92       921        97
VIS    2025250    200200   22.4000  144.1000      12.8        93       923        98
VIS    2025250    200200   22.3900  144.0600      12.2        92       923        98
VIS    2025250    200200   22.3900  144.0500      12.1        91       923        99
VIS    2025250    200200   22.3900  144.0200      11.9        93       922        99
VIS    2025250    200200   22.4000  143.9800      11.7        96       927        98
VIS    2025250    200200   22.4000  143.9600      11.5        91       945        99
VIS    2025250    200200   22.4000  143.9500      11.6        90       945       100
VIS    2025250    200200   22.3900  143.9100      11.4        91       924       100
VIS    2025250    200200   22.3800  143.9000      11.4        91       927        99
VIS    2025250    200200   22.4000  143.8700      11.7        94       925        99
VIS    2025250    200200   22.3800  143.8000      10.6        95       971        94
VIS    2025250    200200   22.3700  142.9100       7.9        97       988        94
VIS    2025250    200200   22.3900  142.8600       8.3        87       974        95
VIS    2025250    200200   22.3800  142.8500       8.9        90       953        95
VIS    2025250    200200   22.3700  142.8200      10.6       103       927        94
VIS    2025250    200200   22.3700  142.8000      11.0       103       927        97
VIS    2025250    200200   22.3700  142.7700       9.9        99       930        97
VIS    2025250    200200   22.3700  142.7500       9.6        97       933        99
VIS    2025250    200200   22.3700  142.7100       9.7        91       961        99
VIS    2025250    200200   22.3700  142.7000       9.7        90       961        99
VIS    2025250    200200   22.4800  151.8700       7.2        90       978        92
VIS    2025250    200200   22.4800  151.8700       7.0        89       978        93
VIS    2025250    200200   22.4700  151.8300       6.5        83       936        92
VIS    2025250    200200   22.4700  151.8200       6.6        80       955        90
VIS    2025250    200200   22.4500  151.7800       6.3        85       960        95
VIS    2025250    200200   22.4600  151.7400       6.6        85       933        95
VIS    2025250    200200   22.4700  151.7200       6.3        86       933        97
VIS    2025250    200200   22.4600  151.7000       6.6        92       931        96
VIS    2025250    200200   22.4700  151.6700       6.4        92       936        98
VIS    2025250    200200   22.4500  151.6400       6.5        93       935        94
VIS    2025250    200200   22.4700  151.6200       5.7        91       950        91
VIS    2025250    200200   22.4700  151.6000       6.0        93       938        97
VIS    2025250    200200   22.4700  151.5600       6.3        93       938        98
VIS    2025250    200200   22.4700  151.5400       6.2        95       938        99
VIS    2025250    200200   22.4500  151.5100       6.2        97       932        98
VIS    2025250    200200   22.4700  151.4900       6.5        97       931        97
VIS    2025250    200200   22.4700  151.4800       6.6        98       901        95
VIS    2025250    200200   22.4700  151.4300       5.1        99       866        96
VIS    2025250    200200   22.4700  151.3600       5.0        98       861        98
VIS    2025250    200200   22.4600  151.3300       4.2        95       864        96
VIS    2025250    200200   22.4300  150.4800       9.1       105       937        91
VIS    2025250    200200   22.4400  150.4600       8.1       104       947        94
VIS    2025250    200200   22.4300  150.4300       8.4       109       937        92
VIS    2025250    200200   22.4300  150.3800       9.5       115       913        90
VIS    2025250    200200   22.4300  150.3500       9.9       115       871        96
VIS    2025250    200200   22.4300  150.3400       9.9       114       867        96
VIS    2025250    200200   22.4300  150.3100      10.2       112       867        96
VIS    2025250    200200   22.4300  150.2900      10.5       112       867        95
VIS    2025250    200200   22.4500  150.2000       7.8        94       964        93
VIS    2025250    200200   22.4500  150.1700       8.2        97       929        98
VIS    2025250    200200   22.4400  150.1400       8.5        96       899        97
VIS    2025250    200200   22.4400  150.1300       8.8        93       895        94
VIS    2025250    200200   22.4400  149.8300       7.7        98       989        91
VIS    2025250    200200   22.4400  149.8200       7.9        98       979        91
VIS    2025250    200200   22.4200  149.7800       7.8        99       922        99
VIS    2025250    200200   22.4400  149.7600       8.0       100       946        97
VIS    2025250    200200   22.4400  149.7500       8.0        99       959        98
VIS    2025250    200200   22.4100  148.9500       9.6        95       970        98
VIS    2025250    200200   22.4200  148.9400       9.8        93       969        98
VIS    2025250    200200   22.4200  148.9000      10.3        92       888        94
VIS    2025250    200200   22.4300  148.8800      10.2        92       888        94
VIS    2025250    200200   22.4100  148.8400      10.0        91       874        93
VIS    2025250    200200   22.4300  148.8200       9.9        92       874        93
VIS    2025250    200200   22.4100  148.8000       9.6        92       874        95
VIS    2025250    200200   22.4300  148.7700       9.6        91       875        95
VIS    2025250    200200   22.4300  148.7400       9.9        88       883        96
VIS    2025250    200200   22.4300  148.7300       9.8        87       884        96
VIS    2025250    200200   22.4300  148.7100       9.7        85       889        96
VIS    2025250    200200   22.4000  148.6600       9.6        86       919        99
VIS    2025250    200200   22.4000  148.6400       9.6        87       919        99
VIS    2025250    200200   22.4200  148.6100      10.1        87       893        96
VIS    2025250    200200   22.4100  148.6100       9.9        88       893        96
VIS    2025250    200200   22.4000  148.5800       9.8        88       879        94
VIS    2025250    200200   22.4200  148.5400       8.8        86       880        97
VIS    2025250    200200   22.4200  148.5200       8.3        83       885        96
VIS    2025250    200200   22.4200  148.5000       8.4        82       890        96
VIS    2025250    200200   22.4200  148.4600       8.0        79       906        96
VIS    2025250    200200   22.4000  148.4400       7.9        80       926        98
VIS    2025250    200200   22.4000  148.4300       7.9        82       906        98
VIS    2025250    200200   22.4000  148.3900       9.1        88       892        98
VIS    2025250    200200   22.4200  148.3700       9.5        90       891        98
VIS    2025250    200200   22.4200  148.3400       9.5        88       891        98
VIS    2025250    200200   22.4000  148.3200       9.7        86       892        97
VIS    2025250    200200   22.4100  148.2900       9.7        84       892        96
VIS    2025250    200200   22.4100  148.2700       9.7        83       892        96
VIS    2025250    200200   22.4000  148.2400      10.0        83       844        90
VIS    2025250    200200   22.4100  148.1400       9.2        85       819        90
VIS    2025250    200200   22.4000  148.1200       8.9        86       822        91
VIS    2025250    200200   22.4200  148.0800       8.9        83       825        90
VIS    2025250    200200   22.4100  148.0600       8.1        79       834        90
VIS    2025250    200200   22.4100  148.0000       7.9        80       847        90
VIS    2025250    200200   22.3900  147.9800       8.0        78       842        90
VIS    2025250    200200   22.4200  147.9500       8.8        81       844        91
VIS    2025250    200200   22.4000  147.9300       8.5        83       852        92
VIS    2025250    200200   22.4100  147.9000       9.3        86       850        91
VIS    2025250    200200   22.4100  147.8800       9.6        86       839        91
VIS    2025250    200200   22.3900  147.8700       9.9        85       837        90
VIS    2025250    200200   22.3900  147.8300       9.4        86       836        91
VIS    2025250    200200   22.3900  147.8000       9.5        87       862        90
VIS    2025250    200200   22.3900  147.6000       9.9        88       972        99
VIS    2025250    200200   22.3900  147.5700       9.8        91       957        98
VIS    2025250    200200   22.3900  147.5600       9.5        92       937        98
VIS    2025250    200200   22.3900  147.5300       8.9        95       927        94
VIS    2025250    200200   22.4000  147.5200       8.8        93       927        96
VIS    2025250    200200   22.4000  147.4900       8.7        92       927        97
VIS    2025250    200200   22.3900  147.4500       9.1        94       915        97
VIS    2025250    200200   22.3900  147.4400       8.9        95       911        98
VIS    2025250    200200   22.4000  147.4100       9.3        91       897        99
VIS    2025250    200200   22.3900  147.3900       9.7        87       876        95
VIS    2025250    200200   22.3900  147.3500       9.2        86       882        92
VIS    2025250    200200   22.4000  147.3400       9.2        86       882        91
VIS    2025250    200200   22.4000  147.3100       8.7        85       882        96
VIS    2025250    200200   22.4000  147.2900       8.7        88       882        97
VIS    2025250    200200   22.3900  147.2400       9.1        88       912        96
VIS    2025250    200200   22.3900  147.2400       9.2        89       912        98
VIS    2025250    200200   22.4000  147.1900       9.3        88       906        99
VIS    2025250    200200   22.4100  147.1800       9.8        91       906        97
VIS    2025250    200200   22.4000  147.1400      10.4        90       892        93
VIS    2025250    200200   22.3800  147.1300      10.9        87       892        95
VIS    2025250    200200   22.3900  147.0900      10.9        90       892        96
VIS    2025250    200200   22.4000  147.0800      10.7        91       892        96
VIS    2025250    200200   22.4000  147.0500      10.3        92       904        97
VIS    2025250    200200   22.3800  147.0200      10.9        95       908        98
VIS    2025250    200200   22.4000  147.0000      11.7        95       915        98
VIS    2025250    200200   22.3900  146.9700      11.1        94       919        98
VIS    2025250    200200   22.4000  146.9400      10.9        90       933       100
VIS    2025250    200200   22.4000  146.9400      10.8        90       935       100
VIS    2025250    200200   22.3800  146.8900      10.3        88       934        99
VIS    2025250    200200   22.3900  146.8700      10.5        88       955        99
VIS    2025250    200200   22.4000  146.8600      10.7        86       961        99
VIS    2025250    200200   22.3900  146.8300      11.6        86       971        99
VIS    2025250    200200   22.4000  146.4100      11.4        88       996       100
VIS    2025250    200200   22.3800  146.3800      11.4        87       988        99
VIS    2025250    200200   22.4000  146.3800      11.4        86       997       100
VIS    2025250    200200   22.3800  146.3500      12.0        87       983        99
VIS    2025250    200200   22.3800  146.3300      13.7        89       983        98
VIS    2025250    200200   22.3700  146.2800      12.2        78       982        99
VIS    2025250    200200   22.3900  146.2800      11.4        75       983        98
VIS    2025250    200200   22.3800  145.5300      12.9        93       968        98
VIS    2025250    200200   22.3700  145.5200      13.7        91       966        98
VIS    2025250    200200   22.3800  145.4800      13.0        89       959        99
VIS    2025250    200200   22.3900  145.4700      12.9        91       960        99
VIS    2025250    200200   22.3700  145.4400      13.5        96       959        98
VIS    2025250    200200   22.3800  145.4100      14.6        99       971        95
VIS    2025250    200200   22.3800  145.4000      14.3        96       971        95
VIS    2025250    200200   22.3800  145.3700      14.0        92       971        96
VIS    2025250    200200   22.3700  145.3400      14.0        91       984        97
VIS    2025250    200200   22.3800  145.3000      14.5        91       988        97
VIS    2025250    200200   22.3600  145.2800      14.0        87       970        98
VIS    2025250    200200   22.3700  145.2700      13.4        85       981        99
VIS    2025250    200200   22.3600  145.2300      12.7        82       958        98
VIS    2025250    200200   22.3700  145.2200      12.8        82       958        99
VIS    2025250    200200   22.3600  145.1900      13.2        86       953        99
VIS    2025250    200200   22.3700  145.1500      13.6        90       956        99
VIS    2025250    200200   22.3700  145.1500      13.5        90       948        99
VIS    2025250    200200   22.3700  145.1200      13.1        89       943        99
VIS    2025250    200200   22.3600  145.0800      12.2        88       943       100
VIS    2025250    200200   22.3600  145.0600      12.1        88       943        99
VIS    2025250    200200   22.3800  145.0300      13.2        87       950        99
VIS    2025250    200200   22.3700  145.0200      13.3        89       925        98
VIS    2025250    200200   22.3700  144.9900      13.7        89       925        98
VIS    2025250    200200   22.3700  144.9700      13.2        89       934        99
VIS    2025250    200200   22.3700  144.9400      12.7        89       950       100
VIS    2025250    200200   22.3700  144.9100      12.8        88       991        98
VIS    2025250    200200   22.3700  144.8800      13.1        89       991        96
VIS    2025250    200200   22.3700  144.8700      13.0        91       967        91
VIS    2025250    200200   22.3700  144.8400      12.2        95       967        98
VIS    2025250    200200   22.3600  144.8100      12.5        92       953        99
VIS    2025250    200200   22.3600  144.7800      12.6        89       952       100
VIS    2025250    200200   22.3700  144.7700      12.1        88       953        98
VIS    2025250    200200   22.3700  144.7400      12.5        92       946        99
VIS    2025250    200200   22.3600  144.7100      12.3        93       952        99
VIS    2025250    200200   22.3700  144.6900      13.0        96       955        97
VIS    2025250    200200   22.3600  144.6600      13.1        97       956        95
VIS    2025250    200200   22.3700  144.6300      12.7        92       977        91
VIS    2025250    200200   22.3800  144.6200      13.2        92       991        93
VIS    2025250    200200   22.3600  144.5800      13.9        93       969        97
VIS    2025250    200200   22.3600  144.5600      14.2        93       964        96
VIS    2025250    200200   22.3600  144.5200      13.9        93       948        97
VIS    2025250    200200   22.3600  144.5000      14.1        90       942        97
VIS    2025250    200200   22.3800  144.5000      14.1        88       952        98
VIS    2025250    200200   22.3800  144.4700      14.4        89       946        97
VIS    2025250    200200   22.3600  144.4300      14.2        90       941        97
VIS    2025250    200200   22.3800  144.4000      13.8        91       945        97
VIS    2025250    200200   22.3600  144.3700      13.1        92       936        97
VIS    2025250    200200   22.3600  144.3700      12.8        92       935        96
VIS    2025250    200200   22.3800  144.3300      12.5        90       922        97
VIS    2025250    200200   22.3700  144.3200      12.7        90       921        97
VIS    2025250    200200   22.3500  144.2900      12.9        92       921        99
VIS    2025250    200200   22.3500  144.2700      13.3        91       922        98
VIS    2025250    200200   22.3500  144.2200      13.5        88       922        98
VIS    2025250    200200   22.3700  144.2200      13.0        91       920        98
VIS    2025250    200200   22.3700  144.1900      12.3        93       920        98
VIS    2025250    200200   22.3700  144.1700      12.0        93       920        96
VIS    2025250    200200   22.3700  144.1400      12.7        92       921        93
VIS    2025250    200200   22.3700  144.1000      13.3        93       923        97
VIS    2025250    200200   22.3500  144.0700      13.2        93       931        98
VIS    2025250    200200   22.3600  144.0600      12.7        93       944        98
VIS    2025250    200200   22.3700  144.0300      11.5        92       932        94
VIS    2025250    200200   22.3700  144.0100      11.6        93       932        94
VIS    2025250    200200   22.3600  143.9700      11.6        92       960        96
VIS    2025250    200200   22.3700  143.9700      11.6        91       958        95
VIS    2025250    200200   22.3700  143.9400      11.7        87       958        95
VIS    2025250    200200   22.3700  143.9100      11.3        90       957        97
VIS    2025250    200200   22.3700  143.8700      11.1        92       956        97
VIS    2025250    200200   22.3700  143.8500      10.9        93       963        97
VIS    2025250    200200   22.3700  143.8500      10.9        94       963        97
VIS    2025250    200200   22.3700  143.8100      10.4        95       971        94
VIS    2025250    200200   22.3700  143.8000      10.3        96       971        94
VIS    2025250    200200   22.3500  143.7700       9.9       104       982        93
VIS    2025250    200200   22.3600  143.7400       9.3       107       998        93
VIS    2025250    200200   22.3400  142.9800      12.2        93       996        94
VIS    2025250    200200   22.3400  142.9600      10.7        96       996        99
VIS    2025250    200200   22.3400  142.9500      10.6        96      1000        99
VIS    2025250    200200   22.3500  142.9100       9.5       100       990        95
VIS    2025250    200200   22.3500  142.8800       9.2        94       965        98
VIS    2025250    200200   22.3500  142.8800       9.3        93       965        98
VIS    2025250    200200   22.3400  142.8500      10.6        94       934        97
VIS    2025250    200200   22.3400  142.8100      12.0       102       927        94
VIS    2025250    200200   22.3500  142.8000      11.9       101       927        95
VIS    2025250    200200   22.3500  142.7600      10.3        94       928        97
VIS    2025250    200200   22.3500  142.7400      10.0        94       928        99
VIS    2025250    200200   22.3600  142.7100       9.7        91       927        98
VIS    2025250    200200   22.3400  142.6800      10.7        83       927        97
VIS    2025250    200200   22.3400  142.6800      10.9        81       927        96
VIS    2025250    200200   22.3400  142.5500      12.9        88       992        94
VIS    2025250    200200   22.3400  142.5200      12.8        88       992        97
VIS    2025250    200200   22.3400  142.5200      12.8        87       992        97
VIS    2025250    200200   22.4400  151.7600       5.9        89       960        99
VIS    2025250    200200   22.4400  151.7500       6.0        87       940        99
VIS    2025250    200200   22.4300  151.7200       6.1        95       933        98
VIS    2025250    200200   22.4400  151.6900       7.1        97       933        95
VIS    2025250    200200   22.4400  151.6700       7.3        98       936        94
VIS    2025250    200200   22.4300  151.6400       7.0        99       935        95
VIS    2025250    200200   22.4400  151.6100       6.4        97       935        93
VIS    2025250    200200   22.4300  151.6000       6.1        98       938        96
VIS    2025250    200200   22.4300  151.5500       5.8        96       934        98
VIS    2025250    200200   22.4400  151.5500       6.1        96       936        98
VIS    2025250    200200   22.4300  151.5200       6.3        96       925        97
VIS    2025250    200200   22.4400  151.4900       6.0        92       892        97
VIS    2025250    200200   22.4300  151.4600       5.2        93       859        98
VIS    2025250    200200   22.4200  151.4300       4.5        92       858        96
VIS    2025250    200200   22.4400  151.3500       4.6        94       878        94
VIS    2025250    200200   22.4400  151.3300       4.3        93       878        92
VIS    2025250    200200   22.4400  151.3100       4.1        88       894        90
VIS    2025250    200200   22.4300  151.2900       4.2        86       914        90
VIS    2025250    200200   22.4100  150.4600       9.1       105       937        91
VIS    2025250    200200   22.4200  150.4400       8.7       107       937        92
VIS    2025250    200200   22.4000  150.4000       8.8       110       926        92
VIS    2025250    200200   22.4000  150.3800       8.9       109       913        94
VIS    2025250    200200   22.4200  150.3500       9.7       112       884        95
VIS    2025250    200200   22.4200  150.3400       9.7       111       868        97
VIS    2025250    200200   22.4200  150.3000      10.1       111       875        95
VIS    2025250    200200   22.4000  150.2700      10.7       115       884        91
VIS    2025250    200200   22.4000  150.2400      11.5       123       895        92
VIS    2025250    200200   22.4000  150.2400      11.3       123       898        91
VIS    2025250    200200   22.4000  150.2000       8.3        94       987        90
VIS    2025250    200200   22.4000  150.1700       8.3        92       972        92
VIS    2025250    200200   22.4100  149.8400       7.3       100       977        93
VIS    2025250    200200   22.4100  149.8400       7.3       100       977        93
VIS    2025250    200200   22.4100  149.7900       7.6        99       956        96
VIS    2025250    200200   22.4100  149.7800       7.7        99       943        99
VIS    2025250    200200   22.3900  149.6100       7.0        66       998        92
VIS    2025250    200200   22.4000  149.5800       7.1        66       989        92
VIS    2025250    200200   22.3900  148.9600      10.2        97       970        93
VIS    2025250    200200   22.3900  148.9300      10.0        93       898        96
VIS    2025250    200200   22.3900  148.9100      10.0        91       891        95
VIS    2025250    200200   22.3900  148.8800      10.1        88       881        94
VIS    2025250    200200   22.3900  148.8700      10.1        88       880        94
VIS    2025250    200200   22.3900  148.8400      10.0        89       874        93
VIS    2025250    200200   22.4000  148.8200       9.9        93       874        94
VIS    2025250    200200   22.3900  148.7800       9.5        91       875        95
VIS    2025250    200200   22.3900  148.7700       9.5        91       875        95
VIS    2025250    200200   22.3800  148.7300       9.6        88       885        97
VIS    2025250    200200   22.3800  148.7100       9.5        86       885        97
VIS    2025250    200200   22.3800  148.6900       9.5        86       885        97
VIS    2025250    200200   22.3900  148.6500       9.3        88       919        99
VIS    2025250    200200   22.4000  148.6400       9.5        88       916        99
VIS    2025250    200200   22.3800  148.6100       9.3        88       885        96
VIS    2025250    200200   22.3900  148.5900       9.6        87       879        93
VIS    2025250    200200   22.3900  148.5500       8.6        84       879        97
VIS    2025250    200200   22.4000  148.5300       8.4        84       883        98
VIS    2025250    200200   22.3800  148.5100       8.6        84       885        97
VIS    2025250    200200   22.3800  148.4900       9.0        81       903        97
VIS    2025250    200200   22.3900  148.4400       8.0        79       928        98
VIS    2025250    200200   22.3900  148.4300       8.0        82       906        98
VIS    2025250    200200   22.4000  148.3900       9.0        87       893        98
VIS    2025250    200200   22.3700  148.3700       8.9        86       894        97
VIS    2025250    200200   22.3700  148.3500       8.9        86       895        98
VIS    2025250    200200   22.3700  148.3200       9.2        86       892        97
VIS    2025250    200200   22.3900  148.3000       9.7        85       892        97
VIS    2025250    200200   22.3800  148.2800       9.6        85       892        96
VIS    2025250    200200   22.3700  148.2500       9.6        83       844        90
VIS    2025250    200200   22.3800  148.1100       8.9        83       833        90
VIS    2025250    200200   22.3700  148.0700       8.4        82       841        91
VIS    2025250    200200   22.3900  148.0500       8.0        82       841        91
VIS    2025250    200200   22.3700  148.0300       8.3        82       845        91
VIS    2025250    200200   22.3800  148.0000       8.0        82       842        91
VIS    2025250    200200   22.3700  147.9600       8.0        79       854        91
VIS    2025250    200200   22.3700  147.9300       8.5        80       852        91
VIS    2025250    200200   22.3800  147.9100       9.2        84       845        90
VIS    2025250    200200   22.3800  147.8900       9.7        86       839        90
VIS    2025250    200200   22.3900  147.8600       9.9        86       834        90
VIS    2025250    200200   22.3900  147.8400       9.5        86       834        90
VIS    2025250    200200   22.3600  147.6200       9.0        97       973        96
VIS    2025250    200200   22.3800  147.6000      10.1        91       972        97
VIS    2025250    200200   22.3800  147.5700       9.7        91       953        98
VIS    2025250    200200   22.3800  147.5600       9.3        93       937        99
VIS    2025250    200200   22.3600  147.5300       9.6        96       905       100
VIS    2025250    200200   22.3700  147.4900       9.0        94       923        99
VIS    2025250    200200   22.3800  147.4800       9.3        92       930        99
VIS    2025250    200200   22.3800  147.4600       9.3        93       921        97
VIS    2025250    200200   22.3800  147.4200       9.8        92       908        99
VIS    2025250    200200   22.3600  147.3900      10.0        88       885        95
VIS    2025250    200200   22.3600  147.3600       9.4        87       885        91
VIS    2025250    200200   22.3800  147.3600       9.1        86       876        92
VIS    2025250    200200   22.3800  147.3400       9.0        84       882        90
VIS    2025250    200200   22.3600  147.3100       9.0        84       905        97
VIS    2025250    200200   22.3800  147.2600       8.7        87       907        99
VIS    2025250    200200   22.3600  147.2400       8.4        83       886        94
VIS    2025250    200200   22.3600  147.2300       8.6        84       883        94
VIS    2025250    200200   22.3700  147.2100       9.7        87       886        94
VIS    2025250    200200   22.3700  147.1700      10.7        90       886        92
VIS    2025250    200200   22.3600  147.1600      10.9        88       886        94
VIS    2025250    200200   22.3800  147.1300      10.8        87       892        95
VIS    2025250    200200   22.3700  147.1100      10.6        89       892        95
VIS    2025250    200200   22.3800  147.0600      10.6        90       905        95
VIS    2025250    200200   22.3600  147.0300      10.6        93       904        97
VIS    2025250    200200   22.3800  147.0300      10.6        95       906        98
VIS    2025250    200200   22.3700  147.0100      10.4        95       910        99
VIS    2025250    200200   22.3600  146.9700       9.1        92       919        97
VIS    2025250    200200   22.3600  146.9500       9.4        91       920        98
VIS    2025250    200200   22.3700  146.9100      10.3        90       922       100
VIS    2025250    200200   22.3800  146.8900      10.2        89       922       100
VIS    2025250    200200   22.3700  146.8800      10.3        90       922       100
VIS    2025250    200200   22.3700  146.8500      10.6        89       934        98
VIS    2025250    200200   22.3500  146.8100       9.7        86       971        93
VIS    2025250    200200   22.3500  146.4400      11.4        94       986        98
VIS    2025250    200200   22.3500  146.4100      11.7        93       953        96
VIS    2025250    200200   22.3700  146.3900      11.6        89       975        98
VIS    2025250    200200   22.3700  146.3800      11.5        87       975        99
VIS    2025250    200200   22.3600  146.3500      11.8        86       940        95
VIS    2025250    200200   22.3700  146.3100      13.4        86       951        99
VIS    2025250    200200   22.3700  146.3000      13.2        85       951        99
VIS    2025250    200200   22.3600  146.2700      11.2        75       941        97
VIS    2025250    200200   22.3400  145.6500      12.4        87       985        93
VIS    2025250    200200   22.3400  145.6400      12.1        88       985        95
VIS    2025250    200200   22.3400  145.6000      12.7        90       975        97
VIS    2025250    200200   22.3400  145.5900      13.0        90       975        98
VIS    2025250    200200   22.3400  145.5500      14.3        93       968        98
VIS    2025250    200200   22.3600  145.5200      13.7        92       966        98
VIS    2025250    200200   22.3500  145.5100      14.1        91       958        98
VIS    2025250    200200   22.3400  145.4700      13.7        91       949        99
VIS    2025250    200200   22.3600  145.4500      13.5        93       958        99
VIS    2025250    200200   22.3600  145.4300      14.2        96       955        97
VIS    2025250    200200   22.3400  145.4100      15.0        93       941        95
VIS    2025250    200200   22.3400  145.3900      14.3        91       938        97
VIS    2025250    200200   22.3500  145.3500      14.2        90       947        98
VIS    2025250    200200   22.3400  145.3300      15.2        89       946        96
VIS    2025250    200200   22.3400  145.3000      14.5        89       949        97
VIS    2025250    200200   22.3500  145.2800      13.6        85       959        99
VIS    2025250    200200   22.3400  145.2600      12.8        82       942        94
VIS    2025250    200200   22.3600  145.2300      12.7        82       953        97
VIS    2025250    200200   22.3400  145.2100      12.3        85       933        98
VIS    2025250    200200   22.3400  145.1800      12.7        88       923        99
VIS    2025250    200200   22.3500  145.1600      13.4        89       936        99
VIS    2025250    200200   22.3400  145.1300      13.1        88       923        99
VIS    2025250    200200   22.3600  145.1100      12.4        89       924       100
VIS    2025250    200200   22.3600  145.0800      12.1        89       943       100
VIS    2025250    200200   22.3600  145.0500      12.5        89       941        98
VIS    2025250    200200   22.3400  145.0300      13.1        91       924        95
VIS    2025250    200200   22.3500  144.9900      13.7        91       922        98
VIS    2025250    200200   22.3500  144.9900      13.6        91       922        98
VIS    2025250    200200   22.3500  144.9600      13.2        89       922        99
VIS    2025250    200200   22.3300  144.9300      12.8        88       948       100
VIS    2025250    200200   22.3400  144.8900      13.2        88       991        98
VIS    2025250    200200   22.3400  144.8800      12.7        90       966        98
VIS    2025250    200200   22.3400  144.8600      11.9        91       949        98
VIS    2025250    200200   22.3400  144.8300      12.0        91       949       100
VIS    2025250    200200   22.3500  144.8000      13.0        89       952        99
VIS    2025250    200200   22.3400  144.7700      12.8        91       938        99
VIS    2025250    200200   22.3500  144.7500      12.1        91       938        99
VIS    2025250    200200   22.3300  144.7200      12.2        95       921        99
VIS    2025250    200200   22.3400  144.6900      13.0        95       942        98
VIS    2025250    200200   22.3400  144.6800      12.9        94       942        98
VIS    2025250    200200   22.3300  144.6600      12.1        95       942        97
VIS    2025250    200200   22.3300  144.6400      11.5        93       952        96
VIS    2025250    200200   22.3400  144.5900      13.1        90       984        98
VIS    2025250    200200   22.3500  144.5800      13.7        93       964        97
VIS    2025250    200200   22.3500  144.5600      13.9        94       949        96
VIS    2025250    200200   22.3500  144.5300      14.1        95       939        96
VIS    2025250    200200   22.3500  144.5100      14.3        93       939        97
VIS    2025250    200200   22.3300  144.4800      13.9        92       923        97
VIS    2025250    200200   22.3300  144.4600      13.8        92       923        97
VIS    2025250    200200   22.3500  144.4300      14.1        92       935        97
VIS    2025250    200200   22.3300  144.3900      13.7        91       935        97
VIS    2025250    200200   22.3500  144.3800      13.4        92       936        98
VIS    2025250    200200   22.3400  144.3400      13.2        92       922        98
VIS    2025250    200200   22.3400  144.3400      13.2        92       922        98
VIS    2025250    200200   22.3300  144.3000      13.2        91       922        98
VIS    2025250    200200   22.3400  144.2800      12.9        91       922        99
VIS    2025250    200200   22.3300  144.2600      12.6        90       922        99
VIS    2025250    200200   22.3300  144.2200      12.7        87       923        99
VIS    2025250    200200   22.3400  144.2000      12.6        91       923        99
VIS    2025250    200200   22.3400  144.1800      12.0        93       923        99
VIS    2025250    200200   22.3300  144.1600      11.9        93       925        99
VIS    2025250    200200   22.3300  144.1200      12.5        90       923        96
VIS    2025250    200200   22.3300  144.1100      12.7        89       923        97
VIS    2025250    200200   22.3500  144.0800      13.3        92       931        98
VIS    2025250    200200   22.3500  144.0600      13.1        93       944        98
VIS    2025250    200200   22.3500  144.0100      10.9        93       961        96
VIS    2025250    200200   22.3300  143.9900       9.8       100       967        94
VIS    2025250    200200   22.3400  143.9600      10.6        93       963        98
VIS    2025250    200200   22.3300  143.9200       8.7        86       958        96
VIS    2025250    200200   22.3300  143.9100       8.6        87       956        95
VIS    2025250    200200   22.3400  143.8700      10.7        92       956        97
VIS    2025250    200200   22.3300  143.8400      11.7        94       947        98
VIS    2025250    200200   22.3400  143.8200      10.6        95       967        98
VIS    2025250    200200   22.3300  143.8100      10.7        97       967        97
VIS    2025250    200200   22.3300  143.7500      11.1        97       979        98
VIS    2025250    200200   22.3300  143.7300      11.2        95       979        98
VIS    2025250    200200   22.3200  143.0400      10.7        95       999        99
VIS    2025250    200200   22.3200  143.0300      11.4        93       999        99
VIS    2025250    200200   22.3200  143.0000      12.2        91       986        99
VIS    2025250    200200   22.3200  142.9700      12.6        92       965        98
VIS    2025250    200200   22.3200  142.9600      12.3        93       965        99
VIS    2025250    200200   22.3200  142.9300      12.1        99       976        98
VIS    2025250    200200   22.3200  142.9000      13.3        99       968        96
VIS    2025250    200200   22.3400  142.8700      11.0        93       936        99
VIS    2025250    200200   22.3400  142.8600      11.0        94       934        98
VIS    2025250    200200   22.3200  142.8200      12.5        94       933        95
VIS    2025250    200200   22.3200  142.8100      12.3        94       930        96
VIS    2025250    200200   22.3300  142.7900      11.6        95       926        98
VIS    2025250    200200   22.3300  142.7600      11.0        89       926        96
VIS    2025250    200200   22.3300  142.7400      11.3        88       924        96
VIS    2025250    200200   22.3200  142.7100      11.8        87       920        97
VIS    2025250    200200   22.3300  142.6800      11.1        83       924        94
VIS    2025250    200200   22.3200  142.6700      11.4        84       924        97
VIS    2025250    200200   22.3200  142.6400      12.1        88       959        99
VIS    2025250    200200   22.3200  142.6100      12.0        91       989        97
VIS    2025250    200200   22.3200  142.5700      12.4        90       989        97
VIS    2025250    200200   22.3300  142.5500      12.6        88       992        95
VIS    2025250    200200   22.3200  142.5400      12.3        88       979        98
VIS    2025250    200200   22.3400  142.5200      12.6        86       992        98
VIS    2025250    200200   22.3200  142.4700      12.0        92       985        98
VIS    2025250    200200   22.3200  142.4700      12.0        92       985        98
VIS    2025250    200200   22.3100  142.4200      11.3        93       958        99
VIS    2025250    200200   22.4000  151.7300       5.8        99       978        99
VIS    2025250    200200   22.4200  151.6900       6.5       100       942        97
VIS    2025250    200200   22.4000  151.6700       6.7       100       957        97
VIS    2025250    200200   22.4000  151.6400       6.4        96       957        99
VIS    2025250    200200   22.4100  151.6000       6.0        97       940        99
VIS    2025250    200200   22.4100  151.5800       5.4        97       929        99
VIS    2025250    200200   22.4000  151.5600       5.0        91       925        97
VIS    2025250    200200   22.4100  151.5300       5.9        96       925        98
VIS    2025250    200200   22.4200  151.5200       6.3        96       925        97
VIS    2025250    200200   22.4000  151.4800       5.0        83       860        92
VIS    2025250    200200   22.4000  151.4600       4.5        81       859        94
VIS    2025250    200200   22.4000  151.4200       5.2        80       858        94
VIS    2025250    200200   22.4200  151.4100       4.8        84       859        93
VIS    2025250    200200   22.4000  151.3300       4.0        87       946        90
VIS    2025250    200200   22.3800  150.5400      10.2       105       896        92
VIS    2025250    200200   22.4000  150.4600       9.3       105       937        91
VIS    2025250    200200   22.4000  150.4400       9.2       107       936        90
VIS    2025250    200200   22.4000  150.4000       8.6       110       917        94
VIS    2025250    200200   22.3900  150.3800       8.7       108       896        97
VIS    2025250    200200   22.4000  150.3700       9.1       109       892        95
VIS    2025250    200200   22.3800  150.3400       9.6       110       868        98
VIS    2025250    200200   22.3800  150.2900       9.6       107       877        97
VIS    2025250    200200   22.4000  150.2700      10.7       115       884        92
VIS    2025250    200200   22.3900  150.2400      11.0       122       893        91
VIS    2025250    200200   22.3900  150.1900       8.1        94       978        91
VIS    2025250    200200   22.3900  150.1800       8.3        92       978        91
VIS    2025250    200200   22.3800  150.1400       8.2        94       950        96
VIS    2025250    200200   22.3900  149.8200       7.3       100       977        90
VIS    2025250    200200   22.3900  149.7900       7.4        99       967        92
VIS    2025250    200200   22.3700  149.6100       7.3        76       986        93
VIS    2025250    200200   22.3800  149.6000       7.2        73       986        92
VIS    2025250    200200   22.3800  148.9400      10.1        94       956        98
VIS    2025250    200200   22.3700  148.9100       9.9        90       888        95
VIS    2025250    200200   22.3700  148.8900       9.8        88       880        94
VIS    2025250    200200   22.3700  148.8700       9.9        87       874        93
VIS    2025250    200200   22.3700  148.8300       9.8        88       874        94
VIS    2025250    200200   22.3600  148.8200       9.7        90       883        95
VIS    2025250    200200   22.3500  148.8000       9.4        90       887        96
VIS    2025250    200200   22.3700  148.7800       9.4        91       879        95
VIS    2025250    200200   22.3500  148.7300       9.1        89       884        98
VIS    2025250    200200   22.3600  148.7100       9.4        87       885        97
VIS    2025250    200200   22.3700  148.7000       9.4        86       885        97
VIS    2025250    200200   22.3700  148.6700       9.5        87       885        97
VIS    2025250    200200   22.3600  148.6300       8.9        88       885        99
VIS    2025250    200200   22.3600  148.6200       8.8        88       883        98
VIS    2025250    200200   22.3700  148.5900       9.2        87       879        91
VIS    2025250    200200   22.3700  148.5700       9.1        87       878        93
VIS    2025250    200200   22.3500  148.5300       8.5        85       881        98
VIS    2025250    200200   22.3500  148.5200       8.4        83       885        97
VIS    2025250    200200   22.3700  148.4900       8.9        81       906        97
VIS    2025250    200200   22.3500  148.4600       8.8        77       926        96
VIS    2025250    200200   22.3500  148.4300       8.7        79       899        95
VIS    2025250    200200   22.3700  148.4100       8.4        83       895        98
VIS    2025250    200200   22.3500  148.3800       8.1        81       895        97
VIS    2025250    200200   22.3700  148.3700       8.7        85       895        97
VIS    2025250    200200   22.3500  148.3400       8.2        82       898        97
VIS    2025250    200200   22.3500  148.3200       8.7        84       894        98
VIS    2025250    200200   22.3500  148.2900       9.5        86       892        97
VIS    2025250    200200   22.3600  148.2600       9.5        83       891        96
VIS    2025250    200200   22.3500  148.1700      10.0        86       818        91
VIS    2025250    200200   22.3600  148.1500       8.9        86       820        91
VIS    2025250    200200   22.3500  148.1400       8.7        85       821        91
VIS    2025250    200200   22.3700  148.1000       8.8        82       842        90
VIS    2025250    200200   22.3700  148.0700       8.7        82       841        91
VIS    2025250    200200   22.3500  148.0500       8.7        81       842        90
VIS    2025250    200200   22.3600  148.0200       8.3        82       845        91
VIS    2025250    200200   22.3600  148.0000       8.3        83       845        91
VIS    2025250    200200   22.3600  147.9700       8.2        82       862        92
VIS    2025250    200200   22.3600  147.9400       8.6        81       862        92
VIS    2025250    200200   22.3500  147.9300       9.0        84       862        93
VIS    2025250    200200   22.3400  147.8900       9.0        87       841        92
VIS    2025250    200200   22.3600  147.8900       9.5        88       839        91
VIS    2025250    200200   22.3400  147.8400       9.3        94       858        92
VIS    2025250    200200   22.3400  147.8300       9.2        95       858        91
VIS    2025250    200200   22.3500  147.6300       8.8        94       973        96
VIS    2025250    200200   22.3600  147.6200       8.9        95       973        96
VIS    2025250    200200   22.3400  147.5700       9.5        90       913       100
VIS    2025250    200200   22.3600  147.5600      10.2        91       909        99
VIS    2025250    200200   22.3500  147.5300      10.3        92       905        99
VIS    2025250    200200   22.3400  147.5200      10.4        93       908        99
VIS    2025250    200200   22.3400  147.4800       9.9        95       939        97
VIS    2025250    200200   22.3600  147.4600      10.2        93       941        97
VIS    2025250    200200   22.3400  147.4200       9.8        87       932        99
VIS    2025250    200200   22.3400  147.4200       9.8        87       912        99
VIS    2025250    200200   22.3600  147.3700       9.6        87       885        93
VIS    2025250    200200   22.3600  147.3700       9.5        87       885        92
VIS    2025250    200200   22.3500  147.3400       9.0        88       885        93
VIS    2025250    200200   22.3300  147.3000       8.7        84       903        96
VIS    2025250    200200   22.3300  147.2900       8.6        83       903        95
VIS    2025250    200200   22.3400  147.2700       8.4        83       894        96
VIS    2025250    200200   22.3500  147.2400       8.5        83       883        93
VIS    2025250    200200   22.3400  147.2000      10.9        86       874        91
VIS    2025250    200200   22.3400  147.1900      11.3        88       874        91
VIS    2025250    200200   22.3400  147.1600      11.5        90       886        93
VIS    2025250    200200   22.3500  147.1300      10.5        89       892        96
VIS    2025250    200200   22.3500  147.0900      10.4        90       895        94
VIS    2025250    200200   22.3500  147.0700      10.7        89       898        93
VIS    2025250    200200   22.3400  147.0400      10.7        90       904        96
VIS    2025250    200200   22.3400  147.0300      10.3        91       904        96
VIS    2025250    200200   22.3400  147.0100       9.5        92       904        93
VIS    2025250    200200   22.3500  146.9700       8.9        90       919        98
VIS    2025250    200200   22.3300  146.9500       9.9        89       910        99
VIS    2025250    200200   22.3300  146.9200      10.3        88       915        98
VIS    2025250    200200   22.3400  146.9100      10.4        89       920        99
VIS    2025250    200200   22.3400  146.8800      10.1        90       934        94
VIS    2025250    200200   22.3500  146.8600      10.2        91       934        94
VIS    2025250    200200   22.3500  146.8300      10.3        88       971        93
VIS    2025250    200200   22.3300  146.8100       9.3        81       976        97
VIS    2025250    200200   22.3400  146.7700      10.4        82       983        99
VIS    2025250    200200   22.3400  146.7600      10.6        83       983        99
VIS    2025250    200200   22.3300  146.7300      10.8        83       975        99
VIS    2025250    200200   22.3300  146.4600      10.4        93       986        96
VIS    2025250    200200   22.3400  146.4400      11.5        94       953        97
VIS    2025250    200200   22.3400  146.4300      11.8        93       935        96
VIS    2025250    200200   22.3500  146.4100      11.9        93       953        95
VIS    2025250    200200   22.3400  146.3600      11.9        86       913        94
VIS    2025250    200200   22.3400  146.3500      12.0        87       915        94
VIS    2025250    200200   22.3400  146.3300      12.6        86       915        92
VIS    2025250    200200   22.3400  146.2900      12.5        83       915        96
VIS    2025250    200200   22.3400  146.2600      12.0        80       929        98
VIS    2025250    200200   22.3400  146.2500      12.4        82       923        98
VIS    2025250    200200   22.3300  146.2100      12.9        86       935        99
VIS    2025250    200200   22.3200  146.1800      13.0        89       960        98
VIS    2025250    200200   22.3200  145.7000      10.9        88       990        94
VIS    2025250    200200   22.3300  145.6800      11.9        88       997        94
VIS    2025250    200200   22.3200  145.6600      12.0        89       985        97
VIS    2025250    200200   22.3300  145.6200      12.5        90       968       100
VIS    2025250    200200   22.3200  145.6000      13.2        89       958        99
VIS    2025250    200200   22.3200  145.5600      14.4        92       958        97
VIS    2025250    200200   22.3400  145.5400      14.6        93       965        97
VIS    2025250    200200   22.3300  145.5300      14.6        93       963        97
VIS    2025250    200200   22.3300  145.4800      13.9        92       935        96
VIS    2025250    200200   22.3300  145.4700      13.8        92       938        97
VIS    2025250    200200   22.3100  145.4300      14.9        93       947        96
VIS    2025250    200200   22.3300  145.4300      14.8        94       949        96
VIS    2025250    200200   22.3100  145.4000      15.5        90       908        92
VIS    2025250    200200   22.3200  145.3700      14.6        89       897        91
VIS    2025250    200200   22.3200  145.3500      15.7        91       918        93
VIS    2025250    200200   22.3100  145.3200      16.0        90       935        94
VIS    2025250    200200   22.3300  145.2800      13.4        87       946        95
VIS    2025250    200200   22.3300  145.2800      13.2        86       946        96
VIS    2025250    200200   22.3300  145.2200      12.4        82       933        97
VIS    2025250    200200   22.3200  145.1800      13.0        92       921        99
VIS    2025250    200200   22.3200  145.1800      12.8        91       921        99
VIS    2025250    200200   22.3100  145.1400      13.5        89       919        96
VIS    2025250    200200   22.3100  145.1200      13.7        88       919        95
VIS    2025250    200200   22.3300  145.1000      12.7        89       919        99
VIS    2025250    200200   22.3200  145.0700      12.6        89       920        99
VIS    2025250    200200   22.3300  145.0400      12.8        90       923        95
VIS    2025250    200200   22.3100  145.0100      13.2        92       921        98
VIS    2025250    200200   22.3200  145.0000      13.4        93       921        97
VIS    2025250    200200   22.3300  144.9700      13.3        90       920        98
VIS    2025250    200200   22.3200  144.9300      12.8        88       922        99
VIS    2025250    200200   22.3200  144.9300      12.7        88       948       100
VIS    2025250    200200   22.3100  144.8800      11.8        94       945        97
VIS    2025250    200200   22.3100  144.8800      12.0        92       945        97
VIS    2025250    200200   22.3100  144.8300      12.1        91       921       100
VIS    2025250    200200   22.3100  144.8100      13.2        89       919        98
VIS    2025250    200200   22.3100  144.8000      13.7        89       921        98
VIS    2025250    200200   22.3200  144.7700      13.0        91       921        99
VIS    2025250    200200   22.3100  144.7500      12.9        94       914        98
VIS    2025250    200200   22.3200  144.7300      12.5        95       920        99
VIS    2025250    200200   22.3300  144.6800      12.9        94       934        98
VIS    2025250    200200   22.3300  144.6600      12.3        95       939        97
VIS    2025250    200200   22.3300  144.6500      11.9        96       942        96
VIS    2025250    200200   22.3200  144.6200      11.7        94       961        99
VIS    2025250    200200   22.3200  144.5800      12.3        90       956       100
VIS    2025250    200200   22.3200  144.5700      12.3        92       949        99
VIS    2025250    200200   22.3100  144.5400      13.1        93       920        98
VIS    2025250    200200   22.3100  144.5100      14.4        92       920        96
VIS    2025250    200200   22.3100  144.5000      14.4        92       920        96
VIS    2025250    200200   22.3100  144.4700      13.4        97       921        97
VIS    2025250    200200   22.3000  144.4500      13.6        97       921        97
VIS    2025250    200200   22.3000  144.4100      13.7        93       923        98
VIS    2025250    200200   22.3100  144.3900      13.4        92       923        98
VIS    2025250    200200   22.3100  144.3600      13.2        91       923        99
VIS    2025250    200200   22.3100  144.3400      13.0        91       923        99
VIS    2025250    200200   22.3100  144.3100      13.6        92       922        97
VIS    2025250    200200   22.3000  144.2900      13.4        91       921        97
VIS    2025250    200200   22.3100  144.2700      12.6        90       922        98
VIS    2025250    200200   22.3100  144.2500      12.3        88       923        99
VIS    2025250    200200   22.3200  144.2100      13.1        88       928        99
VIS    2025250    200200   22.3000  144.1900      13.2        91       944        99
VIS    2025250    200200   22.3100  144.1700      12.3        94       944        99
VIS    2025250    200200   22.3000  144.1400      11.7        95       930        98
VIS    2025250    200200   22.3100  144.1200      12.2        92       925        96
VIS    2025250    200200   22.3200  144.1000      13.1        89       924        97
VIS    2025250    200200   22.3200  144.0400      13.3        96       961        97
VIS    2025250    200200   22.3200  144.0100      10.2        98       967        95
VIS    2025250    200200   22.3200  143.9900       9.7       101       967        94
VIS    2025250    200200   22.3100  143.9600       8.8        94       964        94
VIS    2025250    200200   22.3100  143.9400       8.2        85       958        94
VIS    2025250    200200   22.3100  143.9100       8.7        86       945        96
VIS    2025250    200200   22.3000  143.8800      10.8        92       930        99
VIS    2025250    200200   22.3000  143.8800      11.0        92       930        99
VIS    2025250    200200   22.3200  143.8400      11.9        94       943        99
VIS    2025250    200200   22.3200  143.8100      11.2        96       965        98
VIS    2025250    200200   22.3000  143.7700      12.0        94       976        98
VIS    2025250    200200   22.3100  143.7500      11.5        95       979        98
VIS    2025250    200200   22.2900  143.0800      12.3        91       997        99
VIS    2025250    200200   22.2900  143.0500      11.1        91       997       100
VIS    2025250    200200   22.2900  143.0300      11.4        91       986       100
VIS    2025250    200200   22.2900  143.0000      12.3        87       958        97
VIS    2025250    200200   22.3000  142.9700      12.7        90       958        96
VIS    2025250    200200   22.3100  142.9700      12.6        92       965        97
VIS    2025250    200200   22.3000  142.9200      12.7        98       962        97
VIS    2025250    200200   22.2900  142.9000      14.1        96       955        94
VIS    2025250    200200   22.2900  142.8900      14.5        95       955        94
VIS    2025250    200200   22.3000  142.8500      13.6        92       934        95
VIS    2025250    200200   22.3000  142.8200      11.9        92       927        96
VIS    2025250    200200   22.3000  142.8100      11.7        92       927        97
VIS    2025250    200200   22.3000  142.7900      12.2        92       926        97
VIS    2025250    200200   22.3000  142.7700      13.0        90       925        96
VIS    2025250    200200   22.3100  142.7400      12.8        87       923        95
VIS    2025250    200200   22.3100  142.7100      12.7        90       920        97
VIS    2025250    200200   22.2900  142.6700      12.1        93       921        99
VIS    2025250    200200   22.3100  142.6500      11.9        88       939        99
VIS    2025250    200200   22.3000  142.6300      12.4        91       939        98
VIS    2025250    200200   22.3000  142.6100      12.1        92       941        97
VIS    2025250    200200   22.2900  142.5900      11.7        91       941        99
VIS    2025250    200200   22.2900  142.5700      11.5        89       941        99
VIS    2025250    200200   22.3100  142.5300      12.2        88       979        98
VIS    2025250    200200   22.2900  142.5200      12.0        89       955        98
VIS    2025250    200200   22.2900  142.5000      12.3        90       955        98
VIS    2025250    200200   22.2900  142.4500      12.2        94       936        98
VIS    2025250    200200   22.3000  142.4300      11.6        93       937        99
VIS    2025250    200200   22.2900  142.4200      11.6        94       928        99
VIS    2025250    200200   22.3800  151.7900       7.0        86       986        94
VIS    2025250    200200   22.3800  151.7700       6.5        87       985        97
VIS    2025250    200200   22.3800  151.7400       6.5        89       984        98
VIS    2025250    200200   22.4000  151.7200       5.8       100       978        99
VIS    2025250    200200   22.3800  151.6800       6.2        94       974        99
VIS    2025250    200200   22.3800  151.6600       6.3        93       957        98
VIS    2025250    200200   22.3800  151.6400       5.9        91       957        99
VIS    2025250    200200   22.3800  151.6000       6.0        89       929        98
VIS    2025250    200200   22.3800  151.6000       6.0        89       915        97
VIS    2025250    200200   22.3900  151.5600       5.2        91       907        96
VIS    2025250    200200   22.3700  151.5400       5.4        84       883        96
VIS    2025250    200200   22.3700  151.5100       5.2        87       867        96
VIS    2025250    200200   22.3900  151.4800       4.9        83       860        91
VIS    2025250    200200   22.3900  151.4700       4.7        79       859        92
VIS    2025250    200200   22.3900  151.4200       5.4        79       858        93
VIS    2025250    200200   22.3600  150.5600       9.4       112       896        94
VIS    2025250    200200   22.3600  150.5400      10.0       106       889        92
VIS    2025250    200200   22.3500  150.5100      10.5       103       889        92
VIS    2025250    200200   22.3600  150.4900       9.9       105       913        90
VIS    2025250    200200   22.3500  150.4400       9.5       105       888        96
VIS    2025250    200200   22.3700  150.4200       9.5       104       892        96
VIS    2025250    200200   22.3600  150.4000       8.9       106       880        99
VIS    2025250    200200   22.3500  150.3700       9.2       110       867        99
VIS    2025250    200200   22.3700  150.3400       9.8       110       868        96
VIS    2025250    200200   22.3600  150.3200       9.9       108       880        96
VIS    2025250    200200   22.3500  150.2900       9.9       108       880        95
VIS    2025250    200200   22.3500  150.2700      10.0       112       882        93
VIS    2025250    200200   22.3600  150.2400       9.9       118       888        95
VIS    2025250    200200   22.3600  150.2200       9.0       111       936        94
VIS    2025250    200200   22.3500  150.1900       8.3        99       957        94
VIS    2025250    200200   22.3500  150.1700       8.4        95       957        94
VIS    2025250    200200   22.3500  150.1400       8.2        94       950        95
VIS    2025250    200200   22.3400  149.7900       7.5        94       986        90
VIS    2025250    200200   22.3600  149.7600       7.8        96       980        92
VIS    2025250    200200   22.3400  149.1100       9.6        78       948        96
VIS    2025250    200200   22.3500  148.9600      10.1        85       970        93
VIS    2025250    200200   22.3500  148.9300       9.6        88       956        99
VIS    2025250    200200   22.3500  148.9200       9.5        88       923        98
VIS    2025250    200200   22.3400  148.8800       9.4        88       880        95
VIS    2025250    200200   22.3500  148.8500       9.8        89       876        94
VIS    2025250    200200   22.3300  148.8300      10.0        88       890        94
VIS    2025250    200200   22.3500  148.8100       9.6        89       888        95
VIS    2025250    200200   22.3300  148.7900       9.4        87       897        96
VIS    2025250    200200   22.3300  148.7500       9.1        90       890        97
VIS    2025250    200200   22.3300  148.7200       9.1        90       885        98
VIS    2025250    200200   22.3300  148.7000       9.5        90       885        98
VIS    2025250    200200   22.3300  148.6700       9.7        87       885        97
VIS    2025250    200200   22.3400  148.6600       9.5        87       885        97
VIS    2025250    200200   22.3300  148.6400       9.1        86       884        97
VIS    2025250    200200   22.3300  148.6100       9.0        86       879        96
VIS    2025250    200200   22.3300  148.5900       9.1        87       879        96
VIS    2025250    200200   22.3300  148.5500       8.5        87       880        98
VIS    2025250    200200   22.3400  148.5200       8.4        83       885        97
VIS    2025250    200200   22.3300  148.5000       8.5        80       899        96
VIS    2025250    200200   22.3200  148.4900       8.6        80       912        97
VIS    2025250    200200   22.3400  148.4500       8.8        78       926        96
VIS    2025250    200200   22.3200  148.4300       8.9        82       897        93
VIS    2025250    200200   22.3300  148.4100       8.8        81       895        96
VIS    2025250    200200   22.3300  148.3700       8.0        77       895        95
VIS    2025250    200200   22.3300  148.3600       7.8        76       897        95
VIS    2025250    200200   22.3400  148.3200       8.4        82       895        97
VIS    2025250    200200   22.3300  148.3000       9.2        84       892        97
VIS    2025250    200200   22.3300  148.2900       9.4        85       892        97
VIS    2025250    200200   22.3200  148.1800       9.8        86       839        91
VIS    2025250    200200   22.3200  148.1500       9.1        85       839        90
VIS    2025250    200200   22.3200  148.1200       8.6        82       847        91
VIS    2025250    200200   22.3300  148.1000       8.9        79       845        90
VIS    2025250    200200   22.3400  148.0100       8.5        85       845        91
VIS    2025250    200200   22.3300  147.9600       9.0        87       907        98
VIS    2025250    200200   22.3200  147.9300       9.1        87       879        94
VIS    2025250    200200   22.3200  147.9100       8.9        86       850        92
VIS    2025250    200200   22.3200  147.8900       8.8        88       842        93
VIS    2025250    200200   22.3200  147.8700       8.7        90       849        93
VIS    2025250    200200   22.3400  147.8400       9.0        94       858        93
VIS    2025250    200200   22.3400  147.8300       8.9        96       881        93
VIS    2025250    200200   22.3200  147.7900       8.2        96       949        95
VIS    2025250    200200   22.3300  147.7800       9.2        97       970        93
VIS    2025250    200200   22.3200  147.7200       8.8       100       985        91
VIS    2025250    200200   22.3100  147.6900       7.8        85       973        94
VIS    2025250    200200   22.3100  147.6600       7.9        84       959        96
VIS    2025250    200200   22.3300  147.6500       8.3        87       973        97
VIS    2025250    200200   22.3100  147.6000       8.5        89       913        99
VIS    2025250    200200   22.3200  147.5800       8.7        91       913        99
VIS    2025250    200200   22.3300  147.5500       9.9        89       911        99
VIS    2025250    200200   22.3300  147.5400      10.1        89       908        99
VIS    2025250    200200   22.3300  147.5200      10.5        92       908        98
VIS    2025250    200200   22.3300  147.5000       9.8        97       929        98
VIS    2025250    200200   22.3100  147.4500       9.1        89       952        98
VIS    2025250    200200   22.3200  147.4500       9.1        88       941        99
VIS    2025250    200200   22.3300  147.4200       9.6        87       932        99
VIS    2025250    200200   22.3100  147.3900       8.9        88       894        96
VIS    2025250    200200   22.3100  147.3500       8.5        89       891        95
VIS    2025250    200200   22.3200  147.3400       8.7        90       891        95
VIS    2025250    200200   22.3300  147.3000       8.7        85       900        96
VIS    2025250    200200   22.3300  147.3000       8.6        84       894        95
VIS    2025250    200200   22.3300  147.2700       8.7        82       872        91
VIS    2025250    200200   22.3300  147.2300       9.5        84       872        92
VIS    2025250    200200   22.3100  147.2100      10.7        87       877        93
VIS    2025250    200200   22.3100  147.1700      11.3        92       886        93
VIS    2025250    200200   22.3200  147.1700      11.6        91       886        93
VIS    2025250    200200   22.3300  147.1300      10.6        93       889        97
VIS    2025250    200200   22.3100  147.1100       9.6        90       898        95
VIS    2025250    200200   22.3100  147.0900       9.7        88       898        95
VIS    2025250    200200   22.3200  147.0500      10.9        90       901        97
VIS    2025250    200200   22.3300  147.0400      10.6        90       904        97
VIS    2025250    200200   22.3100  147.0000       9.3        88       910        99
VIS    2025250    200200   22.3100  146.9700       9.8        87       910        99
VIS    2025250    200200   22.3100  146.9600      10.1        87       910        99
VIS    2025250    200200   22.3300  146.9300      10.3        87       915        99
VIS    2025250    200200   22.3000  146.9100       9.7        85       926        93
VIS    2025250    200200   22.3300  146.8900      10.1        89       943        93
VIS    2025250    200200   22.3100  146.8500      10.0        86       968        95
VIS    2025250    200200   22.3100  146.8400       9.8        83       969        97
VIS    2025250    200200   22.3100  146.8000       9.9        75       971        97
VIS    2025250    200200   22.3000  146.7700      10.6        78       964        97
VIS    2025250    200200   22.3100  146.7500      10.6        84       975        98
VIS    2025250    200200   22.3100  146.7300      10.4        85       975        98
VIS    2025250    200200   22.3100  146.7100      10.6        84       973        98
VIS    2025250    200200   22.3100  146.6900      11.2        84       980       100
VIS    2025250    200200   22.3000  146.6600      11.2        81       990        98
VIS    2025250    200200   22.3000  146.5200      11.2        97       997        97
VIS    2025250    200200   22.3000  146.4900      10.6        93       997        97
VIS    2025250    200200   22.3000  146.4900      10.6        93       997        96
VIS    2025250    200200   22.3100  146.4700      10.4        93       968        93
VIS    2025250    200200   22.3100  146.4200      11.7        91       919        97
VIS    2025250    200200   22.3200  146.4200      12.0        92       924        96
VIS    2025250    200200   22.3200  146.3800      12.3        87       913        93
VIS    2025250    200200   22.3200  146.3600      12.6        85       912        94
VIS    2025250    200200   22.3000  146.3200      13.2        87       910        95
VIS    2025250    200200   22.3000  146.3000      13.3        88       910        95
VIS    2025250    200200   22.3100  146.2700      12.9        87       910        96
VIS    2025250    200200   22.3100  146.2500      12.8        87       913        97
VIS    2025250    200200   22.3100  146.2400      12.6        87       922        99
VIS    2025250    200200   22.3200  146.2100      12.6        87       933        99
VIS    2025250    200200   22.3200  146.1800      12.8        89       960        99
VIS    2025250    200200   22.3000  145.7400      12.0        93       990        94
VIS    2025250    200200   22.2900  145.7400      12.0        93       990        96
VIS    2025250    200200   22.2900  145.6900      11.3        88       962        97
VIS    2025250    200200   22.3000  145.6700      11.6        88       968        95
VIS    2025250    200200   22.3000  145.6500      12.0        89       963        97
VIS    2025250    200200   22.2900  145.6200      13.1        85       939        98
VIS    2025250    200200   22.3100  145.6000      13.2        89       951        99
VIS    2025250    200200   22.3000  145.5800      13.7        91       951        98
VIS    2025250    200200   22.3000  145.5400      14.9        94       935        95
VIS    2025250    200200   22.3100  145.5000      14.1        93       918        96
VIS    2025250    200200   22.3000  145.4600      14.9        94       918        95
VIS    2025250    200200   22.3100  145.4400      14.8        94       935        96
VIS    2025250    200200   22.3100  145.4000      15.5        90       908        91
VIS    2025250    200200   22.3100  145.3200      16.0        90       934        93
VIS    2025250    200200   22.3100  145.3100      15.2        90       934        95
VIS    2025250    200200   22.2900  145.2900      14.0        89       933        98
VIS    2025250    200200   22.3000  145.2600      13.3        88       908        95
VIS    2025250    200200   22.3000  145.2200      13.6        90       922        98
VIS    2025250    200200   22.3000  145.2000      13.4        95       922        98
VIS    2025250    200200   22.3000  145.1700      13.7        94       921        97
VIS    2025250    200200   22.3100  145.1500      13.7        90       919        96
VIS    2025250    200200   22.2900  145.1400      13.8        89       920        94
VIS    2025250    200200   22.3000  145.1100      13.4        89       919        95
VIS    2025250    200200   22.2900  145.0800      12.6        89       920        99
VIS    2025250    200200   22.2900  145.0400      13.5        88       920        98
VIS    2025250    200200   22.2900  145.0300      13.7        88       920        97
VIS    2025250    200200   22.2900  144.9900      13.1        90       919        98
VIS    2025250    200200   22.3000  144.9900      13.2        90       919        97
VIS    2025250    200200   22.2900  144.9500      13.2        90       920        98
VIS    2025250    200200   22.3000  144.9400      12.9        90       921        99
VIS    2025250    200200   22.3000  144.9000      12.0        93       948        99
VIS    2025250    200200   22.3000  144.8900      11.7        94       945        98
VIS    2025250    200200   22.2900  144.8600      10.6        86       920        94
VIS    2025250    200200   22.3000  144.8200      11.8        89       919        99
VIS    2025250    200200   22.3000  144.8100      12.9        89       917        99
VIS    2025250    200200   22.3000  144.7700      13.0        92       913        97
VIS    2025250    200200   22.3000  144.7400      13.0        94       913        98
VIS    2025250    200200   22.2900  144.7300      13.3        94       913        98
VIS    2025250    200200   22.2800  144.7100      13.2        92       914        97
VIS    2025250    200200   22.3000  144.6800      13.0        95       919        97
VIS    2025250    200200   22.2900  144.6600      12.6        95       920        98
VIS    2025250    200200   22.3000  144.6400      12.6        94       933        98
VIS    2025250    200200   22.2900  144.5900      13.4        91       949        98
VIS    2025250    200200   22.2900  144.5700      12.7        93       949        99
VIS    2025250    200200   22.3000  144.5600      12.3        93       949        99
VIS    2025250    200200   22.2800  144.5100      13.7        90       915        98
VIS    2025250    200200   22.2800  144.5100      13.9        89       915        97
VIS    2025250    200200   22.3000  144.4700      13.5        96       920        97
VIS    2025250    200200   22.2900  144.4400      14.2        96       920        96
VIS    2025250    200200   22.2800  144.4100      13.9        92       950        96
VIS    2025250    200200   22.2800  144.4000      13.6        92       952        97
VIS    2025250    200200   22.2900  144.3900      13.1        92       940        99
VIS    2025250    200200   22.2800  144.3400      13.2        90       923        99
VIS    2025250    200200   22.2800  144.3300      13.3        91       923        98
VIS    2025250    200200   22.2800  144.3100      14.1        93       916        94
VIS    2025250    200200   22.2800  144.2800      14.2        93       916        95
VIS    2025250    200200   22.3000  144.2600      12.6        89       922        99
VIS    2025250    200200   22.2800  144.2100      13.5        91       944        98
VIS    2025250    200200   22.3000  144.1900      13.5        91       944        98
VIS    2025250    200200   22.2800  144.1800      13.4        92       944        97
VIS    2025250    200200   22.3000  144.1500      11.7        95       944        98
VIS    2025250    200200   22.3000  144.1400      11.7        94       930        98
VIS    2025250    200200   22.3000  144.1100      11.9        91       952        94
VIS    2025250    200200   22.2800  144.0800      11.5        89       992       100
VIS    2025250    200200   22.2900  144.0500      11.2        93       994        99
VIS    2025250    200200   22.2800  144.0200      10.9        96       980        96
VIS    2025250    200200   22.2900  144.0000      11.3        94       980        94
VIS    2025250    200200   22.2800  143.9600       9.9        91       960        97
VIS    2025250    200200   22.2900  143.9500       8.8        91       958        95
VIS    2025250    200200   22.2700  143.9200      10.0        90       932        98
VIS    2025250    200200   22.2700  143.8900      11.1        92       927        99
VIS    2025250    200200   22.2700  143.8700      11.5        92       928        99
VIS    2025250    200200   22.2800  143.8600      11.8        91       930        99
VIS    2025250    200200   22.2800  143.8200      12.9        91       947        99
VIS    2025250    200200   22.2900  143.8100      12.7        92       957        99
VIS    2025250    200200   22.2800  143.7800      12.9        90       972        99
VIS    2025250    200200   22.2900  143.7600      12.4        91       976        98
VIS    2025250    200200   22.2700  143.3000      10.9        86       980        99
VIS    2025250    200200   22.2700  143.2700      12.1        85       980        96
VIS    2025250    200200   22.2700  143.2400      12.2        87       971        98
VIS    2025250    200200   22.2700  143.2400      12.1        87       971        98
VIS    2025250    200200   22.2700  143.2100      12.3        89       972        97
VIS    2025250    200200   22.2800  143.0800      11.6        94       997        99
VIS    2025250    200200   22.2800  143.0400      11.3        93       997       100
VIS    2025250    200200   22.2700  143.0300      11.4        93       977        99
VIS    2025250    200200   22.2700  143.0000      12.5        89       936        93
VIS    2025250    200200   22.2700  142.9700      13.1        89       931        92
VIS    2025250    200200   22.2700  142.9400      12.5        93       931        98
VIS    2025250    200200   22.2800  142.9100      12.7        94       947        98
VIS    2025250    200200   22.2800  142.9100      12.8        94       947        98
VIS    2025250    200200   22.2800  142.8800      14.2        94       934        92
VIS    2025250    200200   22.2900  142.8400      12.7        92       927        94
VIS    2025250    200200   22.2800  142.8100      11.6        90       926        95
VIS    2025250    200200   22.2700  142.8000      11.6        90       925        97
VIS    2025250    200200   22.2800  142.7600      14.0        94       925        95
VIS    2025250    200200   22.2800  142.7400      14.9        97       924        92
VIS    2025250    200200   22.2700  142.7300      14.9       100       921        91
VIS    2025250    200200   22.2700  142.7000      13.7       100       920        94
VIS    2025250    200200   22.2900  142.6700      12.3        94       921        98
VIS    2025250    200200   22.2700  142.6500      12.3        98       928        91
VIS    2025250    200200   22.2800  142.6200      12.4        94       939        97
VIS    2025250    200200   22.2700  142.5900      11.7        92       925        99
VIS    2025250    200200   22.2700  142.5800      11.6        91       925        99
VIS    2025250    200200   22.2700  142.5600      11.0        89       925       100
VIS    2025250    200200   22.2600  142.5200      12.0        89       932        99
VIS    2025250    200200   22.2700  142.5000      12.8        90       932        97
VIS    2025250    200200   22.2700  142.4700      12.9        91       932        97
VIS    2025250    200200   22.2800  142.4500      12.3        94       928        98
VIS    2025250    200200   22.2700  142.4300      12.7        94       923        97
VIS    2025250    200200   22.3600  151.8100       7.3        81       986        94
VIS    2025250    200200   22.3500  151.7600       7.1        88       984        91
VIS    2025250    200200   22.3500  151.7500       6.9        89       984        93
VIS    2025250    200200   22.3500  151.7100       5.9        89       948        97
VIS    2025250    200200   22.3500  151.7000       5.9        90       969        98
VIS    2025250    200200   22.3500  151.6600       6.2        93       957        98
VIS    2025250    200200   22.3700  151.6300       5.9        88       953        97
VIS    2025250    200200   22.3700  151.6100       6.0        88       929        94
VIS    2025250    200200   22.3700  151.5800       6.0        89       873        95
VIS    2025250    200200   22.3600  151.5600       5.5        85       864        95
VIS    2025250    200200   22.3600  151.5300       5.5        82       864        96
VIS    2025250    200200   22.3600  151.5000       5.3        85       867        94
VIS    2025250    200200   22.3700  151.4500       5.4        75       859        91
VIS    2025250    200200   22.3600  151.4400       5.8        73       858        91
VIS    2025250    200200   22.3300  150.5500       9.3       112       890        94
VIS    2025250    200200   22.3300  150.5400       9.3       111       890        95
VIS    2025250    200200   22.3500  150.5200      10.3       103       889        93
VIS    2025250    200200   22.3300  150.4900      10.3       105       889        93
VIS    2025250    200200   22.3500  150.4500       9.3       105       888        97
VIS    2025250    200200   22.3300  150.4200       9.0       105       867        99
VIS    2025250    200200   22.3400  150.4200       9.1       104       877        98
VIS    2025250    200200   22.3400  150.3700       9.4       110       867        98
VIS    2025250    200200   22.3400  150.3600       9.6       111       867        98
VIS    2025250    200200   22.3300  150.3300      10.0       107       875        96
VIS    2025250    200200   22.3300  150.2900       9.7       107       882        95
VIS    2025250    200200   22.3300  150.2600       9.5       113       882        93
VIS    2025250    200200   22.3500  150.2600       9.8       114       883        92
VIS    2025250    200200   22.3300  150.2100       9.0       111       889       100
VIS    2025250    200200   22.3200  150.2000       8.7       109       896       100
VIS    2025250    200200   22.3400  150.1800       8.3        98       955        94
VIS    2025250    200200   22.3400  150.1400       8.3        95       950        95
VIS    2025250    200200   22.3400  150.1300       8.1        96       950        92
VIS    2025250    200200   22.3200  150.0000       8.1       101       972        91
VIS    2025250    200200   22.3100  149.1100       9.0        85       948        99
VIS    2025250    200200   22.3200  149.0900       9.3        81       948        97
VIS    2025250    200200   22.3100  149.0800       9.4        80       948        97
VIS    2025250    200200   22.3100  148.9400       9.3        84       978        91
VIS    2025250    200200   22.3300  148.9100       9.2        86       923        98
VIS    2025250    200200   22.3300  148.9100       9.2        87       904        97
VIS    2025250    200200   22.3000  148.8700       9.4        88       890        96
VIS    2025250    200200   22.3100  148.8500       9.8        87       886        94
VIS    2025250    200200   22.3200  148.8200      10.1        87       893        94
VIS    2025250    200200   22.3200  148.8000       9.6        87       897        95
VIS    2025250    200200   22.3100  148.7600       9.1        88       897        97
VIS    2025250    200200   22.3000  148.7500       9.0        88       895        98
VIS    2025250    200200   22.3200  148.7200       9.1        89       886        97
VIS    2025250    200200   22.3100  148.6800       9.5        85       887        96
VIS    2025250    200200   22.3100  148.6500       9.7        85       887        96
VIS    2025250    200200   22.3000  148.6400       9.5        84       885        96
VIS    2025250    200200   22.3200  148.6000       9.1        86       879        96
VIS    2025250    200200   22.3200  148.6000       9.1        86       879        96
VIS    2025250    200200   22.3100  148.5700       8.5        85       880        98
VIS    2025250    200200   22.3000  148.5300       8.4        81       889        97
VIS    2025250    200200   22.3000  148.5200       8.5        82       893        97
VIS    2025250    200200   22.3200  148.5000       8.6        81       899        96
VIS    2025250    200200   22.3000  148.4500       9.2        83       900        97
VIS    2025250    200200   22.3200  148.4300       8.8        83       896        94
VIS    2025250    200200   22.3200  148.4200       8.8        83       896        94
VIS    2025250    200200   22.3100  148.3700       8.5        79       893        96
VIS    2025250    200200   22.3100  148.3600       8.3        78       893        95
VIS    2025250    200200   22.3000  148.3200       8.4        82       891        97
VIS    2025250    200200   22.3200  148.3000       8.9        84       891        97
VIS    2025250    200200   22.3200  148.2800       9.5        84       891        96
VIS    2025250    200200   22.3000  148.2600       9.9        84       891        96
VIS    2025250    200200   22.3000  148.2300       9.7        86       833        91
VIS    2025250    200200   22.3000  148.2000       9.4        86       839        91
VIS    2025250    200200   22.3100  148.1700       9.5        86       841        91
VIS    2025250    200200   22.3100  148.1700       9.5        85       841        90
VIS    2025250    200200   22.2900  148.1200       9.4        82       860        90
VIS    2025250    200200   22.3100  148.1100       8.7        81       849        90
VIS    2025250    200200   22.3100  148.0700       9.2        80       847        90
VIS    2025250    200200   22.2900  148.0000       9.2        89       959        99
VIS    2025250    200200   22.2900  147.9700       8.9        88       940       100
VIS    2025250    200200   22.3000  147.9600       9.0        88       940       100
VIS    2025250    200200   22.3100  147.8800       9.0        89       839        91
VIS    2025250    200200   22.2900  147.8200       6.8        83       888        93
VIS    2025250    200200   22.3100  147.8000       7.7        95       934        97
VIS    2025250    200200   22.3100  147.7700       7.9        94       949        93
VIS    2025250    200200   22.3100  147.7600       8.3        97       961        93
VIS    2025250    200200   22.3000  147.7100       7.7        89       973        91
VIS    2025250    200200   22.2900  147.6700       7.8        84       950        96
VIS    2025250    200200   22.3100  147.6400       7.9        84       950        96
VIS    2025250    200200   22.3000  147.6300       8.1        86       921        97
VIS    2025250    200200   22.2900  147.5900       8.9        91       927        96
VIS    2025250    200200   22.2900  147.5800       8.6        90       941        95
VIS    2025250    200200   22.2900  147.5300       8.4        88       945        97
VIS    2025250    200200   22.2900  147.5300       8.6        89       943        97
VIS    2025250    200200   22.3000  147.4900       9.7        93       954        98
VIS    2025250    200200   22.2900  147.4600       9.8        89       958        99
VIS    2025250    200200   22.3000  147.4500       9.4        87       933        99
VIS    2025250    200200   22.3100  147.4200       8.9        86       905        96
VIS    2025250    200200   22.2900  147.3900       8.9        89       907        97
VIS    2025250    200200   22.2900  147.3800       8.8        89       894        95
VIS    2025250    200200   22.3000  147.2500       9.7        86       867        91
VIS    2025250    200200   22.2900  147.2100      10.7        89       880        95
VIS    2025250    200200   22.3000  147.1800      11.1        91       886        94
VIS    2025250    200200   22.3000  147.1800      11.1        91       886        94
VIS    2025250    200200   22.3000  147.1400      10.1        91       895        97
VIS    2025250    200200   22.3000  147.1100       9.7        90       898        96
VIS    2025250    200200   22.3000  147.1000       9.5        89       898        96
VIS    2025250    200200   22.3000  147.0700      10.4        89       898        97
VIS    2025250    200200   22.2900  147.0400       9.9        88       898        98
VIS    2025250    200200   22.2800  147.0000       9.7        88       910        99
VIS    2025250    200200   22.2900  146.9900       9.9        88       910        99
VIS    2025250    200200   22.3000  146.9500      10.3        85       901        98
VIS    2025250    200200   22.2900  146.9300      10.0        85       910        98
VIS    2025250    200200   22.3000  146.9200       9.8        85       926        95
VIS    2025250    200200   22.2800  146.8800      10.3        80       948        98
VIS    2025250    200200   22.2800  146.8700      10.7        79       946        98
VIS    2025250    200200   22.2800  146.8300      10.9        75       937        95
VIS    2025250    200200   22.2800  146.8200      10.9        73       937        96
VIS    2025250    200200   22.2900  146.8000      10.1        72       940        95
VIS    2025250    200200   22.3000  146.7700      10.7        78       964        97
VIS    2025250    200200   22.2800  146.7300      10.6        85       936        99
VIS    2025250    200200   22.2800  146.7100      10.3        85       938        99
VIS    2025250    200200   22.2800  146.6700      10.9        81       951        99
VIS    2025250    200200   22.2800  146.6200      11.4        85       980        94
VIS    2025250    200200   22.2800  146.5700      11.0        92       985        94
VIS    2025250    200200   22.2700  146.5200      11.6        98       967        93
VIS    2025250    200200   22.2900  146.5000      11.2        93       997        97
VIS    2025250    200200   22.2900  146.4900      10.9        92       997        97
VIS    2025250    200200   22.2900  146.4700      11.0        91       946        93
VIS    2025250    200200   22.2800  146.4200      11.5        88       910        97
VIS    2025250    200200   22.2800  146.4100      11.5        87       910        98
VIS    2025250    200200   22.2700  146.3700      12.2        83       910        96
VIS    2025250    200200   22.2700  146.3700      12.5        83       910        96
VIS    2025250    200200   22.2800  146.3300      13.8        84       910        93
VIS    2025250    200200   22.2800  146.3000      13.4        87       912        95
VIS    2025250    200200   22.2700  146.2900      13.2        86       912        96
VIS    2025250    200200   22.2900  146.2700      12.7        87       912        97
VIS    2025250    200200   22.2900  146.2400      11.9        87       920       100
VIS    2025250    200200   22.2900  146.2200      11.7        85       923        99
VIS    2025250    200200   22.2700  146.0300      12.2        88       996        97
VIS    2025250    200200   22.2700  146.0200      12.2        90       958        98
VIS    2025250    200200   22.2700  146.0000      12.3        90       980        99
VIS    2025250    200200   22.2800  145.9700      12.8        88       999       100
VIS    2025250    200200   22.2800  145.9300      12.7        89       987        99
VIS    2025250    200200   22.2800  145.9300      12.7        89       987        99
VIS    2025250    200200   22.2700  145.7600      12.5        93       984        97
VIS    2025250    200200   22.2700  145.7500      12.1        94       984        98
VIS    2025250    200200   22.2700  145.7200      12.2        91       962        97
VIS    2025250    200200   22.2700  145.7100      12.1        90       951        97
VIS    2025250    200200   22.2800  145.6800      12.5        86       941        98
VIS    2025250    200200   22.2700  145.6500      13.4        84       908        94
VIS    2025250    200200   22.2800  145.6200      13.5        83       935        97
VIS    2025250    200200   22.2700  145.6000      13.7        85       936        95
VIS    2025250    200200   22.2800  145.5800      13.8        90       937        95
VIS    2025250    200200   22.2800  145.3800      15.3        90       897        90
VIS    2025250    200200   22.2800  145.3000      14.4        89       908        94
VIS    2025250    200200   22.2800  145.2700      13.5        87       897        92
VIS    2025250    200200   22.2700  145.2500      13.5        89       919        95
VIS    2025250    200200   22.2600  145.2100      13.9        95       922        96
VIS    2025250    200200   22.2600  145.2000      13.9        94       922        96
VIS    2025250    200200   22.2700  145.1800      13.6        94       922        98
VIS    2025250    200200   22.2800  145.1400      13.7        89       921        95
VIS    2025250    200200   22.2800  145.1200      13.5        89       920        95
VIS    2025250    200200   22.2700  145.0800      12.5        88       920        99
VIS    2025250    200200   22.2700  145.0800      12.4        88       920        99
VIS    2025250    200200   22.2600  145.0400      13.6        87       919        97
VIS    2025250    200200   22.2600  145.0100      13.4        90       918        98
VIS    2025250    200200   22.2800  145.0000      13.2        91       919        98
VIS    2025250    200200   22.2600  144.9600      13.0        90       919        98
VIS    2025250    200200   22.2700  144.9500      13.1        90       920        98
VIS    2025250    200200   22.2600  144.9200      12.1        98       939        98
VIS    2025250    200200   22.2800  144.8900      11.5        96       939        94
VIS    2025250    200200   22.2600  144.8700      10.1        91       919        90
VIS    2025250    200200   22.2800  144.8400      10.6        89       918        95
VIS    2025250    200200   22.2600  144.8200      10.6        95       908        97
VIS    2025250    200200   22.2600  144.7900      11.4        96       891       100
VIS    2025250    200200   22.2700  144.7600      12.6        94       894        95
VIS    2025250    200200   22.2800  144.7500      13.1        93       905        95
VIS    2025250    200200   22.2600  144.7200      12.8        93       900        98
VIS    2025250    200200   22.2700  144.7000      13.3        92       913        94
VIS    2025250    200200   22.2700  144.6600      13.5        92       911        97
VIS    2025250    200200   22.2700  144.6300      13.5        94       917        96
VIS    2025250    200200   22.2800  144.6300      13.7        94       920        96
VIS    2025250    200200   22.2600  144.5900      15.0        95       909        93
VIS    2025250    200200   22.2600  144.5600      13.6        99       913        96
VIS    2025250    200200   22.2500  144.5400      13.3        94       906        98
VIS    2025250    200200   22.2700  144.5100      13.7        90       915        98
VIS    2025250    200200   22.2600  144.4900      14.5        89       915        96
VIS    2025250    200200   22.2600  144.4700      14.9        92       920        94
VIS    2025250    200200   22.2700  144.4500      14.7        94       920        94
VIS    2025250    200200   22.2700  144.4100      13.8        92       952        97
VIS    2025250    200200   22.2600  144.3800      13.2        91       952        99
VIS    2025250    200200   22.2600  144.3800      13.2        90       950        99
VIS    2025250    200200   22.2600  144.3400      13.1        88       922        99
VIS    2025250    200200   22.2600  144.3300      13.3        89       914        96
VIS    2025250    200200   22.2700  144.3000      14.4        92       914        94
VIS    2025250    200200   22.2600  144.2600      14.8        90       923        95
VIS    2025250    200200   22.2700  144.2500      14.4        89       928        95
VIS    2025250    200200   22.2700  144.2100      13.4        90       945        98
VIS    2025250    200200   22.2700  144.2000      13.6        90       944        98
VIS    2025250    200200   22.2500  144.1700      12.8        86       950        97
VIS    2025250    200200   22.2500  144.1500      12.0        84       951        95
VIS    2025250    200200   22.2600  144.1100      12.0        87       956       100
VIS    2025250    200200   22.2700  144.0900      11.9        88       964       100
VIS    2025250    200200   22.2700  144.0700      11.1        89       992       100
VIS    2025250    200200   22.2600  144.0300      10.8        93       982        98
VIS    2025250    200200   22.2700  144.0200      10.9        95       980        97
VIS    2025250    200200   22.2700  143.9800      11.1        93       968        99
VIS    2025250    200200   22.2500  143.9600      11.1        93       941        99
VIS    2025250    200200   22.2500  143.9300      10.8        94       939        99
VIS    2025250    200200   22.2700  143.9200      10.4        90       932        99
VIS    2025250    200200   22.2500  143.9000      11.7        93       932        99
VIS    2025250    200200   22.2600  143.8800      11.8        92       930        99
VIS    2025250    200200   22.2600  143.8300      12.2        92       939        99
VIS    2025250    200200   22.2500  143.8100      12.8        95       942        98
VIS    2025250    200200   22.2500  143.7900      13.0        93       947        99
VIS    2025250    200200   22.2600  143.7700      13.0        89       960        96
VIS    2025250    200200   22.2600  143.3100      10.1        85       980        93
VIS    2025250    200200   22.2500  143.2900      11.0        85       980        98
VIS    2025250    200200   22.2600  143.2600      12.1        86       971        98
VIS    2025250    200200   22.2400  143.2300      11.8        89       958       100
VIS    2025250    200200   22.2400  143.2100      11.7        89       971       100
VIS    2025250    200200   22.2400  143.2000      11.4        89       971       100
VIS    2025250    200200   22.2500  143.0500      11.1        96       996        99
VIS    2025250    200200   22.2500  143.0200      12.5        96       962        95
VIS    2025250    200200   22.2400  143.0100      12.9        96       962        93
VIS    2025250    200200   22.2500  142.9800      12.5        92       928        96
VIS    2025250    200200   22.2600  142.9500      12.4        93       929        98
VIS    2025250    200200   22.2400  142.9400      12.2        92       929        97
VIS    2025250    200200   22.2500  142.9100      12.3        92       929        94
VIS    2025250    200200   22.2600  142.8900      12.6        92       925        95
VIS    2025250    200200   22.2500  142.8700      12.3        94       925        94
VIS    2025250    200200   22.2600  142.8200      11.4        91       925        95
VIS    2025250    200200   22.2500  142.8100      11.2        92       925        97
VIS    2025250    200200   22.2400  142.7700      12.1        94       926        98
VIS    2025250    200200   22.2400  142.7500      12.4        95       926        98
VIS    2025250    200200   22.2400  142.7400      12.2        97       926        98
VIS    2025250    200200   22.2500  142.7000      12.7       100       921        95
VIS    2025250    200200   22.2600  142.6900      13.1       100       921        95
VIS    2025250    200200   22.2600  142.6500      12.3        99       930        93
VIS    2025250    200200   22.2500  142.6400      11.9       100       931        95
VIS    2025250    200200   22.2600  142.6000      11.8        94       924        97
VIS    2025250    200200   22.2600  142.5900      11.7        94       923        98
VIS    2025250    200200   22.2600  142.5500      11.1        91       925       100
VIS    2025250    200200   22.2500  142.5400      11.2        91       925       100
VIS    2025250    200200   22.2500  142.5000      13.1        90       926        97
VIS    2025250    200200   22.2600  142.4800      13.2        91       925        97
VIS    2025250    200200   22.2600  142.4500      13.0        94       923        97
VIS    2025250    200200   22.2600  142.4400      12.9        94       923        97
VIS    2025250    200200   22.3200  151.7900       7.1        83       976        93
VIS    2025250    200200   22.3200  151.7700       6.8        86       916        96
VIS    2025250    200200   22.3300  151.7500       6.7        88       948        96
VIS    2025250    200200   22.3400  151.7200       6.0        88       948        98
VIS    2025250    200200   22.3300  151.7000       5.7        88       925        94
VIS    2025250    200200   22.3300  151.6600       5.7        92       953        96
VIS    2025250    200200   22.3400  151.6500       5.8        90       953        97
VIS    2025250    200200   22.3300  151.6300       5.5        88       925        97
VIS    2025250    200200   22.3400  151.5900       6.1        91       872        93
VIS    2025250    200200   22.3400  151.5600       5.7        89       863        97
VIS    2025250    200200   22.3400  151.5300       5.6        78       862        93
VIS    2025250    200200   22.3400  151.4300       5.9        83       872        90
VIS    2025250    200200   22.3300  151.4100       6.1        92       906        95
VIS    2025250    200200   22.3200  151.3900       6.0        95       940        97
VIS    2025250    200200   22.3000  150.5400       8.6       110       900        96
VIS    2025250    200200   22.3100  150.5300       9.0       109       890        97
VIS    2025250    200200   22.3100  150.4900      10.2       107       881        95
VIS    2025250    200200   22.3000  150.4700      10.3       109       883        94
VIS    2025250    200200   22.3200  150.4300       8.7       107       867       100
VIS    2025250    200200   22.3100  150.4100       8.9       107       867       100
VIS    2025250    200200   22.3100  150.4000       8.8       108       867       100
VIS    2025250    200200   22.3200  150.3700       9.4       108       867        98
VIS    2025250    200200   22.3100  150.3400       9.6       106       870        98
VIS    2025250    200200   22.3100  150.3200       9.6       106       871        97
VIS    2025250    200200   22.3200  150.3000       9.6       106       875        97
VIS    2025250    200200   22.3100  150.2700       9.3       110       871        96
VIS    2025250    200200   22.3000  150.2300       9.5       115       883        99
VIS    2025250    200200   22.3000  150.2000       9.0       115       883        99
VIS    2025250    200200   22.3000  150.1700       9.1       114       881        99
VIS    2025250    200200   22.3100  150.1500       8.6       108       895        99
VIS    2025250    200200   22.3100  150.1400       7.9       105       903        97
VIS    2025250    200200   22.3100  150.0200       8.2        97       966        92
VIS    2025250    200200   22.3100  149.9900       7.9        98       959        94
VIS    2025250    200200   22.3000  149.9800       7.9        97       959        91
VIS    2025250    200200   22.2800  149.1500       8.2        94       940        99
VIS    2025250    200200   22.3000  149.1100       8.7        91       940       100
VIS    2025250    200200   22.3000  149.0800       9.1        84       933        98
VIS    2025250    200200   22.2800  149.0700       9.3        83       934        97
VIS    2025250    200200   22.2800  149.0300       9.5        91       990        95
VIS    2025250    200200   22.2800  149.0200       9.4        92       986        95
VIS    2025250    200200   22.2900  148.9900       9.0        95       981        95
VIS    2025250    200200   22.2900  148.9300       9.2        87       950        98
VIS    2025250    200200   22.2800  148.9000       9.6        89       928        97
VIS    2025250    200200   22.2800  148.9000       9.5        90       928        98
VIS    2025250    200200   22.2900  148.8500       9.5        86       895        95
VIS    2025250    200200   22.3000  148.8300      10.2        83       897        93
VIS    2025250    200200   22.3000  148.8200      10.2        83       897        93
VIS    2025250    200200   22.2900  148.8000       9.6        85       897        95
VIS    2025250    200200   22.2900  148.7500       8.8        87       895        97
VIS    2025250    200200   22.2900  148.7200       8.7        86       892        95
VIS    2025250    200200   22.3000  148.7000       8.9        84       892        96
VIS    2025250    200200   22.3000  148.6900       9.0        84       890        96
VIS    2025250    200200   22.2800  148.6500       9.4        81       882        95
VIS    2025250    200200   22.2900  148.6400       9.5        82       882        96
VIS    2025250    200200   22.3000  148.6100       9.2        85       881        96
VIS    2025250    200200   22.2700  148.5700       8.8        83       883        96
VIS    2025250    200200   22.2900  148.5500       8.6        82       884        96
VIS    2025250    200200   22.2900  148.5400       8.6        82       884        96
VIS    2025250    200200   22.2900  148.5100       9.1        84       899        96
VIS    2025250    200200   22.2900  148.4800       9.5        85       907        98
VIS    2025250    200200   22.2900  148.4400       9.2        83       900        97
VIS    2025250    200200   22.2900  148.4300       8.7        84       894        95
VIS    2025250    200200   22.2900  148.4100       8.7        83       891        95
VIS    2025250    200200   22.2700  148.3700       8.8        85       890        98
VIS    2025250    200200   22.2700  148.3500       9.0        86       892        98
VIS    2025250    200200   22.2700  148.3300       9.1        86       891        98
VIS    2025250    200200   22.2700  148.3000       9.4        87       890        97
VIS    2025250    200200   22.2900  148.2900       9.5        85       890        96
VIS    2025250    200200   22.2700  148.2400       9.9        88       847        92
VIS    2025250    200200   22.2900  148.2200       9.7        86       829        91
VIS    2025250    200200   22.2700  148.2000       9.5        87       841        91
VIS    2025250    200200   22.2700  148.1700       9.1        88       858        92
VIS    2025250    200200   22.2700  148.1400       8.8        88       874        94
VIS    2025250    200200   22.2900  148.1200       9.6        83       864        90
VIS    2025250    200200   22.2800  148.1100       9.6        83       872        91
VIS    2025250    200200   22.2800  148.0800       9.3        84       856        90
VIS    2025250    200200   22.2700  148.0600       9.0        87       885        92
VIS    2025250    200200   22.2900  148.0100       9.3        88       959        99
VIS    2025250    200200   22.2700  147.9800       8.5        87       950        99
VIS    2025250    200200   22.2900  147.9700       8.7        88       940       100
VIS    2025250    200200   22.2900  147.9600       8.9        87       866        94
VIS    2025250    200200   22.2900  147.8300       6.9        83       866        90
VIS    2025250    200200   22.2600  147.8000       7.1        84       894        96
VIS    2025250    200200   22.2600  147.7600       7.1        87       945        92
VIS    2025250    200200   22.2600  147.7400       7.6        88       951        91
VIS    2025250    200200   22.2700  147.7100       7.7        89       951        94
VIS    2025250    200200   22.2800  147.6900       7.8        87       950        96
VIS    2025250    200200   22.2700  147.6600       8.2        86       885        95
VIS    2025250    200200   22.2700  147.6400       8.5        86       894        93
VIS    2025250    200200   22.2800  147.6200       8.9        89       921        98
VIS    2025250    200200   22.2800  147.5800       8.8        91       948        96
VIS    2025250    200200   22.2700  147.5500       7.8        82       962        95
VIS    2025250    200200   22.2700  147.5400       7.9        82       953        96
VIS    2025250    200200   22.2700  147.5000       8.8        86       921        98
VIS    2025250    200200   22.2700  147.5000       9.1        88       928        99
VIS    2025250    200200   22.2700  147.4500       9.4        84       903        98
VIS    2025250    200200   22.2600  147.4300       9.1        86       906        98
VIS    2025250    200200   22.2700  147.4000       9.1        88       907        95
VIS    2025250    200200   22.2700  147.4000       9.1        88       907        92
VIS    2025250    200200   22.2600  147.2500      10.0        85       874        92
VIS    2025250    200200   22.2700  147.2400       9.9        85       874        91
VIS    2025250    200200   22.2700  147.2100      10.3        88       886        96
VIS    2025250    200200   22.2600  147.1900      10.1        86       889        96
VIS    2025250    200200   22.2700  147.1500      10.2        88       892        97
VIS    2025250    200200   22.2800  147.1300       9.8        89       895        98
VIS    2025250    200200   22.2700  147.1000      10.1        97       892        99
VIS    2025250    200200   22.2600  147.0800       9.8        96       892       100
VIS    2025250    200200   22.2700  147.0500       9.4        87       895        98
VIS    2025250    200200   22.2500  147.0400       9.4        84       895        97
VIS    2025250    200200   22.2800  147.0000      10.0        89       910        99
VIS    2025250    200200   22.2700  146.9900      10.3        90       906        99
VIS    2025250    200200   22.2700  146.9700      10.1        90       892        98
VIS    2025250    200200   22.2600  146.9100       9.8        85       886        95
VIS    2025250    200200   22.2600  146.8900      10.3        81       922        98
VIS    2025250    200200   22.2700  146.8600      11.3        78       931        97
VIS    2025250    200200   22.2600  146.8200      11.4        80       932        98
VIS    2025250    200200   22.2600  146.7900      10.2        85       931        99
VIS    2025250    200200   22.2600  146.7800       9.9        84       931        99
VIS    2025250    200200   22.2500  146.7600      11.2        85       929       100
VIS    2025250    200200   22.2700  146.7300      10.6        85       936        99
VIS    2025250    200200   22.2600  146.6900      10.2        81       934        98
VIS    2025250    200200   22.2500  146.6800      10.8        81       933        99
VIS    2025250    200200   22.2600  146.6600      11.3        81       933        98
VIS    2025250    200200   22.2700  146.6100      11.0        87       980        95
VIS    2025250    200200   22.2500  146.5700      11.4        91       985        99
VIS    2025250    200200   22.2500  146.5400      11.7        98       966        93
VIS    2025250    200200   22.2600  146.5300      11.7        99       946        91
VIS    2025250    200200   22.2700  146.5100      11.8        96       946        94
VIS    2025250    200200   22.2700  146.4900      11.9        91       912        96
VIS    2025250    200200   22.2500  146.4600      12.2        85       910        98
VIS    2025250    200200   22.2500  146.4300      11.8        84       910        95
VIS    2025250    200200   22.2600  146.4000      11.4        84       910        97
VIS    2025250    200200   22.2600  146.3700      11.7        82       910        97
VIS    2025250    200200   22.2600  146.3600      12.1        83       910        98
VIS    2025250    200200   22.2500  146.3200      12.7        85       910        96
VIS    2025250    200200   22.2500  146.3100      12.4        84       910        98
VIS    2025250    200200   22.2500  146.2700      11.8        84       913        99
VIS    2025250    200200   22.2600  146.2500      11.5        86       913        99
VIS    2025250    200200   22.2600  146.2100      11.6        87       924       100
VIS    2025250    200200   22.2600  146.2000      11.9        87       926       100
VIS    2025250    200200   22.2500  146.1500      12.5        87       978       100
VIS    2025250    200200   22.2400  146.1000      12.8        85       998        99
VIS    2025250    200200   22.2400  146.0800      12.6        87       968        99
VIS    2025250    200200   22.2500  146.0400      12.3        88       958        98
VIS    2025250    200200   22.2400  146.0100      12.0        90       944        98
VIS    2025250    200200   22.2400  146.0100      11.9        91       944        98
VIS    2025250    200200   22.2400  145.9800      11.8        91       975        97
VIS    2025250    200200   22.2500  145.9400      12.3        89       980        99
VIS    2025250    200200   22.2500  145.9300      12.3        89       944        99
VIS    2025250    200200   22.2400  145.8100      11.9        93       990        95
VIS    2025250    200200   22.2400  145.7700      11.6        90       952        98
VIS    2025250    200200   22.2600  145.7500      12.0        93       984        99
VIS    2025250    200200   22.2600  145.7500      11.9        93       964        98
VIS    2025250    200200   22.2600  145.7200      12.2        91       944        97
VIS    2025250    200200   22.2600  145.6900      12.9        87       908        94
VIS    2025250    200200   22.2500  145.6500      13.6        85       905        94
VIS    2025250    200200   22.2500  145.6200      13.9        87       933        97
VIS    2025250    200200   22.2500  145.6200      13.7        88       933        96
VIS    2025250    200200   22.2400  145.5900      14.1        90       951        97
VIS    2025250    200200   22.2500  145.5500      14.4        91       885        90
VIS    2025250    200200   22.2400  145.5300      14.4        90       885        90
VIS    2025250    200200   22.2400  145.4700      14.5        89       920        96
VIS    2025250    200200   22.2400  145.4700      14.6        90       920        96
VIS    2025250    200200   22.2400  145.4400      14.3        90       920        96
VIS    2025250    200200   22.2400  145.3500      14.1        91       911        97
VIS    2025250    200200   22.2400  145.3400      14.1        91       911        97
VIS    2025250    200200   22.2500  145.2600      13.7        86       905        94
VIS    2025250    200200   22.2500  145.2400      13.6        90       921        96
VIS    2025250    200200   22.2400  145.2000      12.0        89       922        98
VIS    2025250    200200   22.2300  145.1700      12.1        87       922        97
VIS    2025250    200200   22.2400  145.1600      12.7        89       922        98
VIS    2025250    200200   22.2600  145.1400      13.0        88       921        98
VIS    2025250    200200   22.2500  145.1200      13.1        86       921        97
VIS    2025250    200200   22.2400  145.0800      14.2        87       920        95
VIS    2025250    200200   22.2300  145.0600      13.9        88       920        96
VIS    2025250    200200   22.2500  145.0300      13.6        88       919        97
VIS    2025250    200200   22.2300  145.0000      13.4        89       918        98
VIS    2025250    200200   22.2400  144.9700      13.2        90       920        98
VIS    2025250    200200   22.2400  144.9700      13.1        91       920        98
VIS    2025250    200200   22.2500  144.9400      12.6        94       939        99
VIS    2025250    200200   22.2300  144.9100      11.9        97       939        98
VIS    2025250    200200   22.2400  144.8900      11.2        96       920        92
VIS    2025250    200200   22.2500  144.8200      10.5        99       892        99
VIS    2025250    200200   22.2400  144.8200      10.7        99       891        99
VIS    2025250    200200   22.2500  144.7700      12.2        93       885        96
VIS    2025250    200200   22.2500  144.7600      12.6        93       888        93
VIS    2025250    200200   22.2400  144.7300      12.8        91       885        94
VIS    2025250    200200   22.2300  144.7100      12.5        96       891        94
VIS    2025250    200200   22.2400  144.6900      12.7        96       904        92
VIS    2025250    200200   22.2500  144.6700      13.3        94       909        95
VIS    2025250    200200   22.2500  144.6200      12.6        98       903        97
VIS    2025250    200200   22.2500  144.6200      12.8        99       903        97
VIS    2025250    200200   22.2500  144.5800      14.2       102       881        93
VIS    2025250    200200   22.2400  144.5500      13.3        97       901        97
VIS    2025250    200200   22.2500  144.5400      13.3        94       906        97
VIS    2025250    200200   22.2400  144.5000      14.7        88       906        90
VIS    2025250    200200   22.2400  144.4500      13.8        89       920        92
VIS    2025250    200200   22.2400  144.4400      14.3        89       933        92
VIS    2025250    200200   22.2400  144.4000      12.9        93       950        98
VIS    2025250    200200   22.2300  144.3700      11.8        97       877        96
VIS    2025250    200200   22.2400  144.3600      13.3        89       921        97
VIS    2025250    200200   22.2400  144.3200      13.8        91       911        94
VIS    2025250    200200   22.2500  144.3200      13.8        91       913        96
VIS    2025250    200200   22.2400  144.2900      14.9        91       919        95
VIS    2025250    200200   22.2400  144.2600      14.4        89       924        96
VIS    2025250    200200   22.2300  144.2400      13.3        86       932        98
VIS    2025250    200200   22.2500  144.2100      13.1        87       947        98
VIS    2025250    200200   22.2400  144.1800      12.9        84       947        98
VIS    2025250    200200   22.2500  144.1700      12.7        84       950        96
VIS    2025250    200200   22.2400  144.1400      12.0        85       947        95
VIS    2025250    200200   22.2300  144.1200      13.6        90       949        99
VIS    2025250    200200   22.2300  144.0900      13.9        90       956        99
VIS    2025250    200200   22.2200  144.0500      12.3        90       969        99
VIS    2025250    200200   22.2400  144.0300      10.8        93       972        97
VIS    2025250    200200   22.2400  144.0200      10.8        94       968        97
VIS    2025250    200200   22.2200  143.9700      11.7        92       943        98
VIS    2025250    200200   22.2200  143.9500      10.8        90       939        97
VIS    2025250    200200   22.2200  143.9200      10.9        92       938        97
VIS    2025250    200200   22.2200  143.9000      11.7        94       938        99
VIS    2025250    200200   22.2200  143.8900      11.9        94       938        99
VIS    2025250    200200   22.2200  143.8600      12.1        92       927        99
VIS    2025250    200200   22.2300  143.8400      11.9        92       929        99
VIS    2025250    200200   22.2300  143.8000      12.9        96       939        98
VIS    2025250    200200   22.2200  143.7800      12.6        94       946        98
VIS    2025250    200200   22.2200  143.7600      12.2        91       955        99
VIS    2025250    200200   22.2300  143.7300      13.0        90       960        99
VIS    2025250    200200   22.2300  143.7100      14.2        93       975        97
VIS    2025250    200200   22.2200  143.6900      13.7        95       975        97
VIS    2025250    200200   22.2200  143.5700      12.1        91       994        97
VIS    2025250    200200   22.2200  143.5400      11.2        86       970        99
VIS    2025250    200200   22.2200  143.4100      12.3        94       996        98
VIS    2025250    200200   22.2200  143.3400      11.7        94       989        98
VIS    2025250    200200   22.2200  143.3200      10.9        92       963        98
VIS    2025250    200200   22.2300  143.2900      10.9        86       979        99
VIS    2025250    200200   22.2200  143.2600      11.9        88       958       100
VIS    2025250    200200   22.2300  143.2400      12.1        89       958       100
VIS    2025250    200200   22.2400  143.2100      11.8        89       958        99
VIS    2025250    200200   22.2300  143.1900      11.7        89       971       100
VIS    2025250    200200   22.2300  143.1800      11.6        91       972        99
VIS    2025250    200200   22.2400  143.0600      12.4        92       996        99
VIS    2025250    200200   22.2400  143.0300      12.9        96       965        95
VIS    2025250    200200   22.2400  143.0000      13.1        97       953        94
VIS    2025250    200200   22.2200  142.9800      12.2        99       962        97
VIS    2025250    200200   22.2300  142.9400      12.0        92       929        97
VIS    2025250    200200   22.2300  142.9400      12.0        91       929        97
VIS    2025250    200200   22.2400  142.9100      12.2        91       929        91
VIS    2025250    200200   22.2300  142.8700      11.5        94       929        96
VIS    2025250    200200   22.2300  142.8600      11.4        95       929        97
VIS    2025250    200200   22.2300  142.8200      10.5        95       929        95
VIS    2025250    200200   22.2300  142.8100      10.3        96       929        95
VIS    2025250    200200   22.2200  142.7800      10.9        96       934        96
VIS    2025250    200200   22.2100  142.7400      11.7        93       935        98
VIS    2025250    200200   22.2100  142.7400      11.7        93       935        98
VIS    2025250    200200   22.2200  142.7100      11.4        94       931        98
VIS    2025250    200200   22.2300  142.6800      11.9       100       931        96
VIS    2025250    200200   22.2300  142.6500      11.5       101       936        97
VIS    2025250    200200   22.2100  142.6400      10.8        97       949        97
VIS    2025250    200200   22.2200  142.6100      10.9        94       924        97
VIS    2025250    200200   22.2200  142.5800      11.3        94       924        99
VIS    2025250    200200   22.2100  142.5500      11.9        94       925        98
VIS    2025250    200200   22.2100  142.5200      12.5        92       926        92
VIS    2025250    200200   22.2100  142.5100      12.7        91       926        90
VIS    2025250    200200   22.2300  142.4900      13.2        91       926        96
VIS    2025250    200200   22.2200  142.4600      12.6        95       927        95
VIS    2025250    200200   22.2200  142.4200      12.0        94       927        98
VIS    2025250    200200   22.3000  151.8100       7.7        79       977        91
VIS    2025250    200200   22.3000  151.7800       6.8        81       916        95
VIS    2025250    200200   22.3100  151.7600       6.4        83       893        97
VIS    2025250    200200   22.3100  151.7300       5.8        85       891        97
VIS    2025250    200200   22.3000  151.7100       5.8        81       887        91
VIS    2025250    200200   22.3100  151.6800       5.3        84       895        90
VIS    2025250    200200   22.3200  151.6400       4.8        87       936        92
VIS    2025250    200200   22.3200  151.6200       5.1        88       925        97
VIS    2025250    200200   22.3100  151.5800       6.0        92       878        97
VIS    2025250    200200   22.3200  151.5600       5.6        85       861        93
VIS    2025250    200200   22.2900  151.4400       5.4        87       918        98
VIS    2025250    200200   22.3000  151.4400       5.2        88       918        99
VIS    2025250    200200   22.2900  151.4100       5.7        97       933        97
VIS    2025250    200200   22.3100  151.3800       6.0        96       955        97
VIS    2025250    200200   22.2900  151.3500       5.9        78       957        93
VIS    2025250    200200   22.3000  150.5300       8.6       109       890        98
VIS    2025250    200200   22.2800  150.5200       8.9       110       889        96
VIS    2025250    200200   22.2900  150.5000       9.8       109       880        96
VIS    2025250    200200   22.2900  150.4700      10.4       109       881        93
VIS    2025250    200200   22.2900  150.4300       9.6       109       881        97
VIS    2025250    200200   22.2800  150.4000       9.7       107       879        96
VIS    2025250    200200   22.3000  150.4000       9.0       107       867        99
VIS    2025250    200200   22.2800  150.3500       9.1       106       875        99
VIS    2025250    200200   22.2800  150.3300       9.4       106       872        98
VIS    2025250    200200   22.2900  150.3200       9.5       106       871        98
VIS    2025250    200200   22.2700  150.2700       9.5       109       871        98
VIS    2025250    200200   22.2900  150.2500       9.5       111       871        99
VIS    2025250    200200   22.2800  150.2200       9.4       115       872        98
VIS    2025250    200200   22.2700  150.2100       8.7       114       872        98
VIS    2025250    200200   22.2700  150.1700       9.2       118       874        98
VIS    2025250    200200   22.2800  150.1600       9.4       117       874        98
VIS    2025250    200200   22.2700  150.1300       8.2       110       881        99
VIS    2025250    200200   22.2900  150.0000       7.9        95       920        98
VIS    2025250    200200   22.2700  149.9300       8.2        98       928        99
VIS    2025250    200200   22.2700  149.9200       8.3        98       928        99
VIS    2025250    200200   22.2700  149.9000       7.9        99       958        94
VIS    2025250    200200   22.2600  149.1900       8.8        95       929       100
VIS    2025250    200200   22.2700  149.1500       8.0        93       940        97
VIS    2025250    200200   22.2700  149.1400       8.2        95       940        98
VIS    2025250    200200   22.2600  149.1000       8.6        93       916       100
VIS    2025250    200200   22.2800  149.0700       9.3        84       933        98
VIS    2025250    200200   22.2600  149.0500       9.2        84       934        98
VIS    2025250    200200   22.2600  149.0300       9.4        88       943        98
VIS    2025250    200200   22.2700  149.0100       9.2        91       974        99
VIS    2025250    200200   22.2700  148.8900       9.1        92       928        98
VIS    2025250    200200   22.2600  148.8600       8.6        94       916        98
VIS    2025250    200200   22.2600  148.8600       8.6        94       916        99
VIS    2025250    200200   22.2600  148.8200       9.4        90       897        96
VIS    2025250    200200   22.2500  148.8100       9.0        92       909        98
VIS    2025250    200200   22.2600  148.7800       8.9        88       894        97
VIS    2025250    200200   22.2600  148.7500       8.8        85       894        98
VIS    2025250    200200   22.2600  148.7200       8.4        83       890        98
VIS    2025250    200200   22.2600  148.6900       8.3        81       884        96
VIS    2025250    200200   22.2700  148.6700       8.9        80       882        94
VIS    2025250    200200   22.2700  148.6500       9.4        80       882        94
VIS    2025250    200200   22.2500  148.6200       9.3        80       882        95
VIS    2025250    200200   22.2700  148.5900       8.9        83       881        96
VIS    2025250    200200   22.2700  148.5800       8.9        83       883        96
VIS    2025250    200200   22.2600  148.5400       9.3        82       893        95
VIS    2025250    200200   22.2600  148.5100       9.1        85       898        96
VIS    2025250    200200   22.2600  148.5000       9.2        86       901        97
VIS    2025250    200200   22.2500  148.4600       8.9        85       865        92
VIS    2025250    200200   22.2500  148.4500       8.8        84       865        93
VIS    2025250    200200   22.2700  148.4100       8.3        83       889        97
VIS    2025250    200200   22.2500  148.3800       8.6        87       868        95
VIS    2025250    200200   22.2500  148.3600       8.9        87       873        96
VIS    2025250    200200   22.2500  148.3300       9.6        88       873        94
VIS    2025250    200200   22.2700  148.3100       9.3        87       890        96
VIS    2025250    200200   22.2700  148.3000       9.4        87       890        97
VIS    2025250    200200   22.2400  148.2500       9.7        92       844        92
VIS    2025250    200200   22.2600  148.2400       9.8        90       844        95
VIS    2025250    200200   22.2400  148.2200       9.3        90       842        91
VIS    2025250    200200   22.2600  148.1900       9.2        89       850        91
VIS    2025250    200200   22.2600  148.1600       8.9        90       866        94
VIS    2025250    200200   22.2500  148.1400       8.0        92       896        96
VIS    2025250    200200   22.2600  148.1000       8.9        85       887        93
VIS    2025250    200200   22.2600  148.0900       9.1        85       885        93
VIS    2025250    200200   22.2600  148.0700       9.0        85       896        95
VIS    2025250    200200   22.2400  148.0400       9.1        88       951        98
VIS    2025250    200200   22.2400  148.0000       8.5        86       950        98
VIS    2025250    200200   22.2500  147.9900       8.5        86       950        99
VIS    2025250    200200   22.2400  147.9300      10.1        93       854        90
VIS    2025250    200200   22.2500  147.9200      10.4        94       830        92
VIS    2025250    200200   22.2600  147.8800      10.0        93       829        92
VIS    2025250    200200   22.2600  147.8500       8.5        89       854        92
VIS    2025250    200200   22.2400  147.8300       8.0        89       870        96
VIS    2025250    200200   22.2600  147.8100       7.3        85       881        95
VIS    2025250    200200   22.2400  147.7900       8.1        88       892        98
VIS    2025250    200200   22.2600  147.7600       7.3        87       945        94
VIS    2025250    200200   22.2600  147.7400       7.7        89       945        91
VIS    2025250    200200   22.2500  147.7000       8.1        94       867        95
VIS    2025250    200200   22.2600  147.6800       7.9        89       872        94
VIS    2025250    200200   22.2600  147.6600       8.2        86       885        94
VIS    2025250    200200   22.2500  147.6400       8.7        85       921        94
VIS    2025250    200200   22.2400  147.6000       9.5        93       962        95
VIS    2025250    200200   22.2400  147.5900       9.2        94       964        95
VIS    2025250    200200   22.2400  147.5600       7.7        83       962        94
VIS    2025250    200200   22.2400  147.5200       7.9        84       921        96
VIS    2025250    200200   22.2400  147.5100       8.6        86       912        98
VIS    2025250    200200   22.2400  147.4600       9.1        85       894        97
VIS    2025250    200200   22.2400  147.4400       9.2        85       904        99
VIS    2025250    200200   22.2400  147.4100       9.1        89       906        96
VIS    2025250    200200   22.2500  147.4100       9.0        89       907        95
VIS    2025250    200200   22.2300  147.2800      10.3        87       888        97
VIS    2025250    200200   22.2500  147.2500      10.1        85       874        92
VIS    2025250    200200   22.2300  147.2200       9.6        84       896        98
VIS    2025250    200200   22.2400  147.1900       9.4        85       904        99
VIS    2025250    200200   22.2300  147.1600       9.6        90       895        99
VIS    2025250    200200   22.2400  147.1400      10.3        94       892        99
VIS    2025250    200200   22.2300  147.1200      10.2        97       892        99
VIS    2025250    200200   22.2300  147.0800       9.6        96       879       100
VIS    2025250    200200   22.2300  147.0800       9.5        94       877       100
VIS    2025250    200200   22.2300  147.0300      10.7        85       877        96
VIS    2025250    200200   22.2300  147.0200      10.9        85       883        96
VIS    2025250    200200   22.2500  146.9800      10.4        89       855        90
VIS    2025250    200200   22.2300  146.9800      10.4        89       833        91
VIS    2025250    200200   22.2300  146.9400       9.8        87       863        90
VIS    2025250    200200   22.2400  146.9200       9.6        85       886        95
VIS    2025250    200200   22.2300  146.9000      10.0        83       927        97
VIS    2025250    200200   22.2400  146.8800      10.7        80       927        97
VIS    2025250    200200   22.2300  146.8300      11.6        83       928        99
VIS    2025250    200200   22.2300  146.8200      11.3        85       929       100
VIS    2025250    200200   22.2300  146.8000      10.7        85       930       100
VIS    2025250    200200   22.2400  146.7800      10.7        86       930       100
VIS    2025250    200200   22.2300  146.7400      12.5        79       925        98
VIS    2025250    200200   22.2400  146.7200      11.7        79       925        99
VIS    2025250    200200   22.2500  146.6800      10.8        81       920        99
VIS    2025250    200200   22.2400  146.6800      11.1        82       915        99
VIS    2025250    200200   22.2500  146.6500      11.3        83       933        99
VIS    2025250    200200   22.2300  146.6000      11.2        83       980        99
VIS    2025250    200200   22.2200  146.5800      11.4        87       980        99
VIS    2025250    200200   22.2200  146.5700      11.5        88       980        99
VIS    2025250    200200   22.2300  146.5400      11.9        94       951        97
VIS    2025250    200200   22.2400  146.5200      11.9        95       944        92
VIS    2025250    200200   22.2300  146.4800      12.2        87       908        98
VIS    2025250    200200   22.2200  146.4700      12.1        85       908        96
VIS    2025250    200200   22.2400  146.4300      11.7        84       910        95
VIS    2025250    200200   22.2400  146.4200      11.7        83       910        96
VIS    2025250    200200   22.2400  146.3800      11.4        81       910        98
VIS    2025250    200200   22.2400  146.3600      11.3        82       910        98
VIS    2025250    200200   22.2200  146.3300      11.1        86       910        99
VIS    2025250    200200   22.2400  146.3100      12.2        84       910        98
VIS    2025250    200200   22.2300  146.3000      12.1        85       913        99
VIS    2025250    200200   22.2300  146.2600      11.9        86       918       100
VIS    2025250    200200   22.2400  146.2500      11.6        87       915       100
VIS    2025250    200200   22.2400  146.2100      12.0        89       926       100
VIS    2025250    200200   22.2300  146.1500      12.7        87       961       100
VIS    2025250    200200   22.2200  146.1100      13.6        85       985        98
VIS    2025250    200200   22.2200  146.0800      13.1        87       968        98
VIS    2025250    200200   22.2200  146.0500      12.7        87       936        98
VIS    2025250    200200   22.2400  146.0500      12.5        87       955        99
VIS    2025250    200200   22.2400  146.0200      12.2        90       944        99
VIS    2025250    200200   22.2200  145.9900      11.4        93       944        97
VIS    2025250    200200   22.2200  145.9600      11.9        88       944        94
VIS    2025250    200200   22.2200  145.8000      12.3        91       990        98
VIS    2025250    200200   22.2200  145.7900      12.1        90       954        99
VIS    2025250    200200   22.2200  145.7500      11.2        87       915        99
VIS    2025250    200200   22.2300  145.7400      11.0        86       910        99
VIS    2025250    200200   22.2100  145.7000      12.3        90       910       100
VIS    2025250    200200   22.2200  145.6900      12.6        90       910        99
VIS    2025250    200200   22.2100  145.6500      12.8        92       916        94
VIS    2025250    200200   22.2200  145.6400      13.0        91       911        99
VIS    2025250    200200   22.2300  145.6100      13.6        93       955        96
VIS    2025250    200200   22.2200  145.5900      14.2        89       951        97
VIS    2025250    200200   22.2100  145.5600      13.6        89       929        99
VIS    2025250    200200   22.2200  145.5300      13.4        89       920        99
VIS    2025250    200200   22.2300  145.5000      14.2        86       920        98
VIS    2025250    200200   22.2300  145.4700      14.7        90       924        96
VIS    2025250    200200   22.2200  145.4600      14.8        91       932        95
VIS    2025250    200200   22.2200  145.4300      14.3        88       920        97
VIS    2025250    200200   22.2100  145.4000      14.2        86       907        96
VIS    2025250    200200   22.2200  145.3900      14.3        88       907        96
VIS    2025250    200200   22.2100  145.3500      13.7        90       915        98
VIS    2025250    200200   22.2200  145.3300      13.5        91       911        98
VIS    2025250    200200   22.2100  145.2800      13.4        88       905        98
VIS    2025250    200200   22.2100  145.2700      13.4        88       910        98
VIS    2025250    200200   22.2300  145.2200      13.1        90       923        97
VIS    2025250    200200   22.2200  145.2100      11.8        86       923        97
VIS    2025250    200200   22.2300  145.1800      11.7        87       922        96
VIS    2025250    200200   22.2300  145.1700      12.1        87       922        97
VIS    2025250    200200   22.2200  145.1300      13.4        85       922        97
VIS    2025250    200200   22.2100  145.1200      14.0        85       922        96
VIS    2025250    200200   22.2100  145.0700      13.7        87       922        99
VIS    2025250    200200   22.2100  145.0700      13.5        88       923        99
VIS    2025250    200200   22.2100  145.0300      13.2        87       922        99
VIS    2025250    200200   22.2300  145.0100      13.4        88       919        97
VIS    2025250    200200   22.2300  144.9800      13.2        89       920        98
VIS    2025250    200200   22.2100  144.9600      12.5        98       929        97
VIS    2025250    200200   22.2200  144.9200      12.7        97       940        97
VIS    2025250    200200   22.2300  144.9100      12.0        97       940        96
VIS    2025250    200200   22.2100  144.8700      12.1        94       909        99
VIS    2025250    200200   22.2100  144.8600      11.9        93       881        97
VIS    2025250    200200   22.2100  144.8400      11.2        96       881        99
VIS    2025250    200200   22.2200  144.8100      11.8        96       879        99
VIS    2025250    200200   22.2100  144.7700      12.6        95       881        97
VIS    2025250    200200   22.2100  144.7500      12.7        93       881        97
VIS    2025250    200200   22.2300  144.7200      12.4        95       881        94
VIS    2025250    200200   22.2300  144.7200      12.2        96       881        94
VIS    2025250    200200   22.2300  144.6900      12.4        97       891        91
VIS    2025250    200200   22.2200  144.6200      10.1        97       805        93
VIS    2025250    200200   22.2200  144.5700      13.1       103       828        92
VIS    2025250    200200   22.2100  144.4700      11.8        96       850        93
VIS    2025250    200200   22.2200  144.4600      11.7        90       888        93
VIS    2025250    200200   22.2200  144.4400      11.3        90       888        95
VIS    2025250    200200   22.2200  144.3700      11.7        98       859        94
VIS    2025250    200200   22.2200  144.3700      12.0        97       859        92
VIS    2025250    200200   22.2000  144.3000      14.2        92       900        92
VIS    2025250    200200   22.2100  144.2700      13.0        90       921        98
VIS    2025250    200200   22.2100  144.2600      12.8        88       923        99
VIS    2025250    200200   22.2100  144.2200      13.0        87       929        99
VIS    2025250    200200   22.2100  144.2200      13.0        87       929        99
VIS    2025250    200200   22.2100  144.1700      13.2        89       939        98
VIS    2025250    200200   22.2200  144.1700      13.1        88       944        97
VIS    2025250    200200   22.2200  144.1300      13.5        91       947        95
VIS    2025250    200200   22.2100  144.1000      13.8        91       961        98
VIS    2025250    200200   22.2100  144.0900      13.8        90       961        98
VIS    2025250    200200   22.2000  144.0400      12.7        91       965        99
VIS    2025250    200200   22.2000  144.0200      12.6        91       952        99
VIS    2025250    200200   22.2000  144.0000      12.7        92       947        99
VIS    2025250    200200   22.2000  143.9900      12.2        91       943        99
VIS    2025250    200200   22.2100  143.9700      11.9        91       942        97
VIS    2025250    200200   22.2200  143.9200      10.9        92       938        97
VIS    2025250    200200   22.2200  143.9200      10.9        92       938        98
VIS    2025250    200200   22.2200  143.8900      11.7        94       938        99
VIS    2025250    200200   22.2200  143.8600      12.3        92       924        99
VIS    2025250    200200   22.2100  143.8200      13.2        93       929        99
VIS    2025250    200200   22.2100  143.8000      13.4        94       932        99
VIS    2025250    200200   22.2000  143.7900      13.4        93       932        99
VIS    2025250    200200   22.2200  143.7500      12.5        91       955        99
VIS    2025250    200200   22.2000  143.7400      12.8        88       946       100
VIS    2025250    200200   22.2000  143.7000      13.3        89       964        99
VIS    2025250    200200   22.2100  143.6700      13.3        87       964        99
VIS    2025250    200200   22.2100  143.6500      13.1        86       973       100
VIS    2025250    200200   22.2200  143.5900      13.1        91       994        98
VIS    2025250    200200   22.2200  143.5500      11.8        89       958        99
VIS    2025250    200200   22.2100  143.5400      11.5        87       945        99
VIS    2025250    200200   22.2000  143.5200      11.9        89       970       100
VIS    2025250    200200   22.2000  143.4700      12.9        96       985        97
VIS    2025250    200200   22.2100  143.4500      12.5        99       998        94
VIS    2025250    200200   22.2100  143.4400      12.5        99       996        94
VIS    2025250    200200   22.2100  143.4100      12.5        94       968        98
VIS    2025250    200200   22.2100  143.3700      12.4        93       989        98
VIS    2025250    200200   22.1900  143.3400      12.3        95       953        98
VIS    2025250    200200   22.2000  143.3000      12.1        92       945        99
VIS    2025250    200200   22.2000  143.2800      12.2        91       944        99
VIS    2025250    200200   22.2000  143.2700      12.1        91       939        99
VIS    2025250    200200   22.2000  143.2300      12.3        91       928        99
VIS    2025250    200200   22.2000  143.2200      12.5        91       927        99
VIS    2025250    200200   22.2100  143.1700      12.3        93       967        99
VIS    2025250    200200   22.1900  143.1600      12.7        91       946        98
VIS    2025250    200200   22.2000  143.1400      12.8        92       956        98
VIS    2025250    200200   22.1900  143.0000      12.5        95       999        98
VIS    2025250    200200   22.1900  142.9800      12.1        97       996        96
VIS    2025250    200200   22.1900  142.9600      12.0        96       951        96
VIS    2025250    200200   22.2100  142.9400      11.7        93       931        99
VIS    2025250    200200   22.1900  142.9200      12.7        94       930        97
VIS    2025250    200200   22.2000  142.8900      12.8        96       929        91
VIS    2025250    200200   22.1900  142.8600      12.4        95       930        97
VIS    2025250    200200   22.2000  142.8400      11.9        95       930        97
VIS    2025250    200200   22.1900  142.8000       9.7        97       936        90
VIS    2025250    200200   22.2100  142.7700      10.9        96       936        95
VIS    2025250    200200   22.2000  142.7700      10.9        95       936        95
VIS    2025250    200200   22.2100  142.7400      11.7        93       944        97
VIS    2025250    200200   22.1900  142.6700      11.3        99       969        97
VIS    2025250    200200   22.2100  142.6600      11.3       100       957        95
VIS    2025250    200200   22.2000  142.6300      10.5        93       956        98
VIS    2025250    200200   22.1900  142.6000      10.8        92       927        99
VIS    2025250    200200   22.1900  142.5800      11.1        92       925        99
VIS    2025250    200200   22.2000  142.5700      11.2        92       925        99
VIS    2025250    200200   22.2000  142.5400      12.1        92       925        95
VIS    2025250    200200   22.2000  142.5000      12.5        91       926        90
VIS    2025250    200200   22.2000  142.4500      11.9        96       927        98
VIS    2025250    200200   22.2100  142.4500      11.9        97       927        97
VIS    2025250    200200   22.2700  151.8100       6.8        74       959        94
VIS    2025250    200200   22.2800  151.7900       6.6        76       905        94
VIS    2025250    200200   22.2800  151.7800       6.6        75       866        93
VIS    2025250    200200   22.2900  151.6100       4.7        94       938        97
VIS    2025250    200200   22.2700  151.5800       5.5        95       925        98
VIS    2025250    200200   22.2800  151.5600       5.7        90       870        98
VIS    2025250    200200   22.2700  151.5400       5.7        90       870        97
VIS    2025250    200200   22.2900  151.5100       6.5        80       854        90
VIS    2025250    200200   22.2900  151.4800       6.3        80       855        93
VIS    2025250    200200   22.2700  151.4500       5.7        87       891        97
VIS    2025250    200200   22.2900  151.4300       5.4        92       932       100
VIS    2025250    200200   22.2900  151.4100       5.7        97       933        99
VIS    2025250    200200   22.2900  151.3800       6.0        94       955        96
VIS    2025250    200200   22.2800  151.3500       6.2        76       957        90
VIS    2025250    200200   22.2700  150.5400       8.2       108       966        90
VIS    2025250    200200   22.2700  150.5200       9.0       109       890        95
VIS    2025250    200200   22.2700  150.4900       9.8       107       881        96
VIS    2025250    200200   22.2700  150.4900       9.9       107       881        95
VIS    2025250    200200   22.2500  150.4500      10.0       104       877        95
VIS    2025250    200200   22.2700  150.4200      10.3       108       886        94
VIS    2025250    200200   22.2700  150.4000      10.4       107       881        94
VIS    2025250    200200   22.2700  150.3800       9.8       107       879        96
VIS    2025250    200200   22.2700  150.3400       9.1       106       875        99
VIS    2025250    200200   22.2700  150.3300       9.3       106       872        98
VIS    2025250    200200   22.2500  150.2900       9.8       107       869        97
VIS    2025250    200200   22.2500  150.2600       9.8       108       871        97
VIS    2025250    200200   22.2600  150.2400       9.6       110       872        97
VIS    2025250    200200   22.2600  150.2100       8.3       112       871        97
VIS    2025250    200200   22.2700  150.2000       8.4       113       870        98
VIS    2025250    200200   22.2700  150.1700       9.0       117       874        98
VIS    2025250    200200   22.2600  150.1400       8.1       114       876        99
VIS    2025250    200200   22.2400  149.9700       7.6        98       951        97
VIS    2025250    200200   22.2400  149.9600       7.8        98       951        96
VIS    2025250    200200   22.2500  149.9200       8.1        98       902        98
VIS    2025250    200200   22.2300  149.3400       8.8        99       963        92
VIS    2025250    200200   22.2400  149.3100       8.1        98       942        96
VIS    2025250    200200   22.2400  149.2200       9.2        97       942        96
VIS    2025250    200200   22.2500  149.1900       8.8        96       929       100
VIS    2025250    200200   22.2500  149.1600       8.2        96       938        99
VIS    2025250    200200   22.2300  149.1400       8.6        99       931        96
VIS    2025250    200200   22.2400  149.1000       8.4        91       900        99
VIS    2025250    200200   22.2400  149.0900       8.4        91       900        99
VIS    2025250    200200   22.2500  149.0500       9.4        85       934        98
VIS    2025250    200200   22.2500  149.0400       9.5        86       933        98
VIS    2025250    200200   22.2400  149.0100       9.2        87       943        99
VIS    2025250    200200   22.2300  148.9100       8.4        99       998        91
VIS    2025250    200200   22.2500  148.8700       8.5        93       969        98
VIS    2025250    200200   22.2300  148.8400       9.0        91       969        98
VIS    2025250    200200   22.2500  148.8400       8.8        93       916       100
VIS    2025250    200200   22.2400  148.7900       8.6        92       895        98
VIS    2025250    200200   22.2400  148.7800       8.7        91       895        99
VIS    2025250    200200   22.2300  148.7400       9.1        87       890        97
VIS    2025250    200200   22.2300  148.7300       9.2        86       888        97
VIS    2025250    200200   22.2300  148.7000       9.4        83       831        90
VIS    2025250    200200   22.2200  148.6600       9.4        84       821        90
VIS    2025250    200200   22.2200  148.6600       9.4        84       821        90
VIS    2025250    200200   22.2200  148.6300       9.5        81       860        90
VIS    2025250    200200   22.2300  148.6000       9.2        80       886        93
VIS    2025250    200200   22.2400  148.5500       9.3        81       881        95
VIS    2025250    200200   22.2200  148.5200       9.2        83       857        90
VIS    2025250    200200   22.2300  148.4900       9.0        85       859        90
VIS    2025250    200200   22.2400  148.4600       8.8        85       854        90
VIS    2025250    200200   22.2400  148.4500       8.7        85       849        90
VIS    2025250    200200   22.2200  148.4300       8.5        86       831        93
VIS    2025250    200200   22.2300  148.3900       9.0        90       844        93
VIS    2025250    200200   22.2200  148.3600       9.3        89       866        94
VIS    2025250    200200   22.2400  148.3300       9.7        88       873        94
VIS    2025250    200200   22.2300  148.3300       9.8        87       873        93
VIS    2025250    200200   22.2300  148.2900       9.5        87       844        91
VIS    2025250    200200   22.2200  148.2700       9.6        89       844        91
VIS    2025250    200200   22.2400  148.2400       9.6        91       842        92
VIS    2025250    200200   22.2400  148.2300       9.4        91       842        92
VIS    2025250    200200   22.2400  148.1900       9.2        89       847        90
VIS    2025250    200200   22.2300  148.1600       8.4        87       866        93
VIS    2025250    200200   22.2200  148.1500       8.2        85       869        94
VIS    2025250    200200   22.2200  148.1100       7.7        89       895        99
VIS    2025250    200200   22.2200  148.0900       8.0        86       908        99
VIS    2025250    200200   22.2200  148.0500       8.8        88       929        99
VIS    2025250    200200   22.2200  148.0500       8.9        89       929        99
VIS    2025250    200200   22.2200  148.0200       8.6        87       936        97
VIS    2025250    200200   22.2400  148.0000       8.4        86       950        97
VIS    2025250    200200   22.2200  147.9000      11.0        99       859        92
VIS    2025250    200200   22.2200  147.8900      10.7        98       859        92
VIS    2025250    200200   22.2300  147.8700       9.7        95       859        94
VIS    2025250    200200   22.2200  147.8400       8.7        92       870        98
VIS    2025250    200200   22.2200  147.8200       8.5        92       875        99
VIS    2025250    200200   22.2100  147.7700       8.7        91       877        93
VIS    2025250    200200   22.2200  147.7600       8.7        93       871        91
VIS    2025250    200200   22.2300  147.7200       8.7       102       846        92
VIS    2025250    200200   22.2300  147.6800       7.5        93       867        97
VIS    2025250    200200   22.2300  147.6500       8.1        82       912        95
VIS    2025250    200200   22.2300  147.6300       8.6        85       928        96
VIS    2025250    200200   22.2300  147.5900       9.3        92       962        96
VIS    2025250    200200   22.2200  147.5700       9.0        90       953        94
VIS    2025250    200200   22.2300  147.5600       8.1        85       962        94
VIS    2025250    200200   22.2300  147.5200       8.8        87       924        97
VIS    2025250    200200   22.2300  147.5100       8.7        87       921        97
VIS    2025250    200200   22.2100  147.4700       9.4        91       894        93
VIS    2025250    200200   22.2100  147.4600       9.2        88       894        92
VIS    2025250    200200   22.2300  147.4200       9.1        87       903        90
VIS    2025250    200200   22.2100  147.3700       9.5        93       882        95
VIS    2025250    200200   22.2100  147.3600       9.7        94       884        95
VIS    2025250    200200   22.2100  147.3300      10.2        91       890        97
VIS    2025250    200200   22.2200  147.3000      10.5        88       888        96
VIS    2025250    200200   22.2300  147.2900      10.4        87       888        97
VIS    2025250    200200   22.2100  147.2600      10.2        89       896        99
VIS    2025250    200200   22.2200  147.2200       9.7        84       906        99
VIS    2025250    200200   22.2300  147.2000       9.1        84       906        98
VIS    2025250    200200   22.2100  147.1600       9.1        92       874        99
VIS    2025250    200200   22.2200  147.1400       9.7        94       892        99
VIS    2025250    200200   22.2000  147.1100       9.5        91       886        98
VIS    2025250    200200   22.2000  147.1100       9.6        90       886        98
VIS    2025250    200200   22.2200  147.0600      10.0        89       877        98
VIS    2025250    200200   22.2200  147.0500      10.9        86       877        96
VIS    2025250    200200   22.2000  147.0300      12.3        86       895        97
VIS    2025250    200200   22.2000  147.0000      11.3        85       895        96
VIS    2025250    200200   22.2200  146.9700      10.3        88       863        93
VIS    2025250    200200   22.2200  146.9500       9.9        87       888        96
VIS    2025250    200200   22.2100  146.9300       9.9        86       930        96
VIS    2025250    200200   22.2200  146.9000      10.0        85       930        96
VIS    2025250    200200   22.2000  146.8800      10.4        84       928        95
VIS    2025250    200200   22.2000  146.8400      10.9        83       927        97
VIS    2025250    200200   22.2200  146.8100      10.8        87       927        99
VIS    2025250    200200   22.2200  146.8100      10.7        86       927        99
VIS    2025250    200200   22.2200  146.7800      10.8        83       927       100
VIS    2025250    200200   22.2000  146.7400      13.7        80       920        96
VIS    2025250    200200   22.2100  146.7100      12.8        79       910        96
VIS    2025250    200200   22.2000  146.6900      11.6        81       906        97
VIS    2025250    200200   22.2000  146.6600      11.5        83       918        99
VIS    2025250    200200   22.2000  146.6400      11.7        83       933       100
VIS    2025250    200200   22.2000  146.6200      11.7        83       950       100
VIS    2025250    200200   22.2000  146.6000      11.3        83       978        99
VIS    2025250    200200   22.2200  146.5600      12.1        90       966        99
VIS    2025250    200200   22.2000  146.5500      12.3        87       951        99
VIS    2025250    200200   22.2000  146.5300      12.1        88       910        97
VIS    2025250    200200   22.2000  146.4800      11.5        82       908        95
VIS    2025250    200200   22.2100  146.4700      12.1        82       908        93
VIS    2025250    200200   22.2000  146.4500      12.2        81       910        90
VIS    2025250    200200   22.2000  146.4300      11.9        82       915        96
VIS    2025250    200200   22.2000  146.3900      11.6        79       918        98
VIS    2025250    200200   22.2100  146.3600      12.2        83       913        98
VIS    2025250    200200   22.2100  146.3500      11.9        83       913        98
VIS    2025250    200200   22.2100  146.3300      11.0        85       910        99
VIS    2025250    200200   22.2100  146.2800      11.8        85       918       100
VIS    2025250    200200   22.2100  146.2600      12.1        85       918       100
VIS    2025250    200200   22.2200  146.2500      12.1        87       918       100
VIS    2025250    200200   22.2100  146.2200      13.0        88       926        98
VIS    2025250    200200   22.2100  146.1500      13.2        87       961        98
VIS    2025250    200200   22.1900  146.1100      13.9        86       985        98
VIS    2025250    200200   22.2100  146.0900      13.3        86       968        98
VIS    2025250    200200   22.1900  146.0500      12.7        87       936        97
VIS    2025250    200200   22.1900  146.0400      12.6        87       936        97
VIS    2025250    200200   22.2000  146.0200      12.4        88       936        98
VIS    2025250    200200   22.2000  145.9800      11.0        92       937        96
VIS    2025250    200200   22.2100  145.9700      11.5        90       937        93
VIS    2025250    200200   22.1900  145.7800      12.4        89       954        99
VIS    2025250    200200   22.2000  145.7600      11.8        87       910        98
VIS    2025250    200200   22.2000  145.7500      12.0        86       910        98
VIS    2025250    200200   22.1900  145.7100      12.3        92       910       100
VIS    2025250    200200   22.1900  145.6800      12.5        94       916        99
VIS    2025250    200200   22.1900  145.6600      13.0        92       925        99
VIS    2025250    200200   22.1900  145.6500      13.2        92       934        98
VIS    2025250    200200   22.1900  145.6100      14.0        89       929        98
VIS    2025250    200200   22.2000  145.5800      14.5        88       929        98
VIS    2025250    200200   22.2100  145.5600      13.4        89       928        99
VIS    2025250    200200   22.1900  145.5400      12.5        88       920       100
VIS    2025250    200200   22.2100  145.5200      12.7        86       920       100
VIS    2025250    200200   22.2100  145.4900      13.8        85       929        97
VIS    2025250    200200   22.2100  145.4600      14.3        90       932        95
VIS    2025250    200200   22.2100  145.4300      14.0        86       920        97
VIS    2025250    200200   22.2000  145.4100      14.1        84       898        93
VIS    2025250    200200   22.2100  145.3400      13.2        90       911        98
VIS    2025250    200200   22.2100  145.3200      13.2        88       910        96
VIS    2025250    200200   22.1900  145.2500      12.7        86       916        98
VIS    2025250    200200   22.1800  145.2400      12.5        85       918        97
VIS    2025250    200200   22.1900  145.2000      12.1        83       920        95
VIS    2025250    200200   22.1800  145.1900      12.7        84       919        97
VIS    2025250    200200   22.2000  145.1700      12.4        83       921        92
VIS    2025250    200200   22.1900  145.1200      13.5        86       921        98
VIS    2025250    200200   22.1900  145.1000      13.3        87       922        99
VIS    2025250    200200   22.2000  145.0900      13.4        87       922        99
VIS    2025250    200200   22.1900  145.0500      12.6        89       921       100
VIS    2025250    200200   22.1900  145.0200      12.5        88       920        99
VIS    2025250    200200   22.1900  145.0200      12.7        88       921        99
VIS    2025250    200200   22.1800  144.9700      11.1       103       919        96
VIS    2025250    200200   22.1900  144.9700      11.5       103       919        96
VIS    2025250    200200   22.2000  144.9200      13.3        97       940        96
VIS    2025250    200200   22.2000  144.9200      13.3        96       940        97
VIS    2025250    200200   22.2000  144.8800      12.5        96       881        98
VIS    2025250    200200   22.2000  144.8500      11.8        95       881        99
VIS    2025250    200200   22.2000  144.8100      12.1        96       864        95
VIS    2025250    200200   22.2000  144.7800      12.0        95       880        98
VIS    2025250    200200   22.2000  144.7500      12.5        94       888        98
VIS    2025250    200200   22.2000  144.7400      12.7        93       880        94
VIS    2025250    200200   22.1800  144.3800      13.2        96       848        90
VIS    2025250    200200   22.1800  144.3700      13.2        95       861        91
VIS    2025250    200200   22.1900  144.3400      14.0        91       876        90
VIS    2025250    200200   22.1800  144.3100      13.4        90       911        95
VIS    2025250    200200   22.1800  144.2900      13.2        90       913        96
VIS    2025250    200200   22.1800  144.2600      12.9        91       923        99
VIS    2025250    200200   22.1800  144.2200      13.4        92       929        99
VIS    2025250    200200   22.1700  144.2200      13.4        92       929        99
VIS    2025250    200200   22.2000  144.1900      13.4        90       934        99
VIS    2025250    200200   22.1900  144.1600      12.9        90       944        99
VIS    2025250    200200   22.1800  144.1400      13.2        90       951        99
VIS    2025250    200200   22.1800  144.1000      13.0        90       955        95
VIS    2025250    200200   22.1700  144.0700      13.1        90       947        92
VIS    2025250    200200   22.1800  144.0600      13.1        91       947        95
VIS    2025250    200200   22.1900  144.0200      13.5        90       947        99
VIS    2025250    200200   22.1900  144.0100      13.5        91       946        99
VIS    2025250    200200   22.1900  143.9900      12.8        91       942        99
VIS    2025250    200200   22.1900  143.9700      12.6        89       942        99
VIS    2025250    200200   22.1900  143.9400      12.1        88       921        99
VIS    2025250    200200   22.1800  143.9000      11.0        93       919       100
VIS    2025250    200200   22.1900  143.8700      11.1        96       914       100
VIS    2025250    200200   22.1800  143.8600      11.7        97       914       100
VIS    2025250    200200   22.1900  143.8400      12.3        95       916        99
VIS    2025250    200200   22.1800  143.8000      13.1        91       927        99
VIS    2025250    200200   22.1700  143.7800      12.1        88       929       100
VIS    2025250    200200   22.1700  143.7700      11.8        85       929        99
VIS    2025250    200200   22.1900  143.7400      12.8        87       936       100
VIS    2025250    200200   22.1800  143.7100      13.4        89       939        98
VIS    2025250    200200   22.1900  143.6900      13.3        88       964        99
VIS    2025250    200200   22.1900  143.6500      13.7        86       957        98
VIS    2025250    200200   22.1800  143.6200      13.5        91       949        97
VIS    2025250    200200   22.1800  143.6100      13.3        94       949        97
VIS    2025250    200200   22.1900  143.5800      12.1        96       938        98
VIS    2025250    200200   22.1800  143.5600      11.8        94       938        99
VIS    2025250    200200   22.1900  143.5400      11.4        88       945       100
VIS    2025250    200200   22.1900  143.5000      12.7        93       970        99
VIS    2025250    200200   22.1800  143.5000      12.9        94       970        98
VIS    2025250    200200   22.1700  143.4700      13.2        97       953        97
VIS    2025250    200200   22.1800  143.4300      13.0        97       944        97
VIS    2025250    200200   22.1800  143.4100      13.8        94       943        97
VIS    2025250    200200   22.1800  143.3900      13.1        92       943        98
VIS    2025250    200200   22.1700  143.3700      12.8        93       939        98
VIS    2025250    200200   22.1900  143.3300      12.6        96       944        98
VIS    2025250    200200   22.1700  143.3100      12.9        93       930        98
VIS    2025250    200200   22.1900  143.2900      12.6        91       939        99
VIS    2025250    200200   22.1800  143.2600      12.3        91       930       100
VIS    2025250    200200   22.1900  143.2300      12.5        91       925        99
VIS    2025250    200200   22.1700  143.2200      12.4        90       925       100
VIS    2025250    200200   22.1900  143.1900      12.7        91       927        98
VIS    2025250    200200   22.1900  143.1500      12.8        91       946        97
VIS    2025250    200200   22.1900  143.1300      12.7        91       956        99
VIS    2025250    200200   22.1700  143.1000      12.9        93       952        98
VIS    2025250    200200   22.1700  143.0900      12.6        95       954        98
VIS    2025250    200200   22.1700  143.0600      11.7        90       986        93
VIS    2025250    200200   22.1700  142.9800      12.4        93       991        99
VIS    2025250    200200   22.1700  142.9500      12.7        93       947        97
VIS    2025250    200200   22.1700  142.9500      12.7        94       934        96
VIS    2025250    200200   22.1800  142.9200      12.6        95       930        97
VIS    2025250    200200   22.1600  142.8900      12.0        93       930        98
VIS    2025250    200200   22.1600  142.8700      12.1        92       930        99
VIS    2025250    200200   22.1800  142.8300      11.7        93       931        99
VIS    2025250    200200   22.1800  142.6300      10.4        91       961        97
VIS    2025250    200200   22.1800  142.6100      10.7        93       938        99
VIS    2025250    200200   22.1700  142.5800      10.8        89       932        99
VIS    2025250    200200   22.1600  142.5700      10.6        87       932        99
VIS    2025250    200200   22.1600  142.5500      11.0        87       927        96
VIS    2025250    200200   22.1800  142.5200      11.4        91       926        92
VIS    2025250    200200   22.1700  142.4700      11.5        90       927        93
VIS    2025250    200200   22.1800  142.4300      11.5        93       927       100
VIS    2025250    200200   22.1800  142.4200      11.5        94       927       100
VIS    2025250    200200   22.2700  151.8000       6.7        74       931        94
VIS    2025250    200200   22.2700  151.8000       6.6        75       905        94
VIS    2025250    200200   22.2600  151.6900       5.2        75       868        91
VIS    2025250    200200   22.2600  151.5800       5.2        96       938        96
VIS    2025250    200200   22.2600  151.5400       5.5        93       907        99
VIS    2025250    200200   22.2600  151.5400       5.6        92       882        99
VIS    2025250    200200   22.2400  151.5100       6.2        88       873        96
VIS    2025250    200200   22.2500  151.4700       6.1        84       873        95
VIS    2025250    200200   22.2600  151.4500       5.6        87       914        98
VIS    2025250    200200   22.2600  151.4300       5.6        87       933        97
VIS    2025250    200200   22.2300  150.5900       8.4        96       978        90
VIS    2025250    200200   22.2300  150.4800       9.5        96       909        91
VIS    2025250    200200   22.2300  150.4500       9.5       100       866        98
VIS    2025250    200200   22.2200  150.4200       9.8       102       854        98
VIS    2025250    200200   22.2500  150.4100      10.6       105       867        95
VIS    2025250    200200   22.2300  150.3900      10.4       105       866        96
VIS    2025250    200200   22.2400  150.3500       8.9       103       866        99
VIS    2025250    200200   22.2400  150.3300       9.1       103       857        99
VIS    2025250    200200   22.2400  150.3100       9.5       105       869        98
VIS    2025250    200200   22.2400  150.2700       9.5       105       869        96
VIS    2025250    200200   22.2400  150.2400       9.5       106       872        91
VIS    2025250    200200   22.2400  150.1900       7.5       104       870        97
VIS    2025250    200200   22.2400  150.1700       7.2       101       874        98
VIS    2025250    200200   22.2400  150.1300       7.2       106       903        97
VIS    2025250    200200   22.2300  150.1100       7.1        97       930        98
VIS    2025250    200200   22.2200  150.0700       8.1        89       964        91
VIS    2025250    200200   22.2300  149.9700       7.8        98       951        94
VIS    2025250    200200   22.2300  149.9400       8.1        97       902        94
VIS    2025250    200200   22.2100  149.3300       9.0        99       963        92
VIS    2025250    200200   22.2100  149.3000       9.0       101       940        95
VIS    2025250    200200   22.2100  149.2900       9.1       101       941        95
VIS    2025250    200200   22.2100  149.2600       9.9       102       941        93
VIS    2025250    200200   22.2200  149.2200       9.3        96       945        96
VIS    2025250    200200   22.2200  149.2000       9.0        95       945        97
VIS    2025250    200200   22.2100  149.1700       8.8        97       931        97
VIS    2025250    200200   22.2200  149.1600       8.8        97       931        97
VIS    2025250    200200   22.2100  149.1300       8.6        98       900        98
VIS    2025250    200200   22.2200  149.0900       8.3        89       892        99
VIS    2025250    200200   22.2200  149.0800       8.3        88       892        99
VIS    2025250    200200   22.2000  149.0500       9.4        95       891        96
VIS    2025250    200200   22.2100  149.0100       9.2        88       935        98
VIS    2025250    200200   22.2000  148.9500       8.8        86       978        93
VIS    2025250    200200   22.2000  148.9300       8.0        83       986        99
VIS    2025250    200200   22.2200  148.9100       8.6        94       998        93
VIS    2025250    200200   22.2100  148.8600       9.3        86       971        99
VIS    2025250    200200   22.2100  148.8400       9.2        87       937        99
VIS    2025250    200200   22.2000  148.8200       8.2        91       932        99
VIS    2025250    200200   22.2100  148.7900       7.7        91       937        98
VIS    2025250    200200   22.2100  148.7600       8.6        92       896        99
VIS    2025250    200200   22.2000  148.7500       8.6        91       896        99
VIS    2025250    200200   22.2100  148.7100       9.5        84       802        90
VIS    2025250    200200   22.2000  148.6900       9.7        83       802        90
VIS    2025250    200200   22.2100  148.6700       9.6        83       805        90
VIS    2025250    200200   22.2200  148.6300       9.6        81       860        90
VIS    2025250    200200   22.2000  148.5900       9.4        80       898        95
VIS    2025250    200200   22.2000  148.5600       8.8        81       858        91
VIS    2025250    200200   22.2000  148.5500       9.0        81       857        90
VIS    2025250    200200   22.2100  148.5200       9.3        82       857        90
VIS    2025250    200200   22.2100  148.4800       9.1        84       835        90
VIS    2025250    200200   22.2100  148.4500       8.5        85       800        92
VIS    2025250    200200   22.2000  148.4200       9.2        91       802        94
VIS    2025250    200200   22.2000  148.4100       9.5        92       835        93
VIS    2025250    200200   22.2100  148.3900       9.1        91       853        93
VIS    2025250    200200   22.2100  148.3700       9.1        88       860        93
VIS    2025250    200200   22.2100  148.3400       9.6        87       866        92
VIS    2025250    200200   22.2000  148.3000       9.9        88       844        91
VIS    2025250    200200   22.2100  148.2700       9.8        88       849        91
VIS    2025250    200200   22.2000  148.2600       9.8        87       849        90
VIS    2025250    200200   22.2100  148.2100       9.2        89       847        92
VIS    2025250    200200   22.2100  148.1900       9.1        87       847        92
VIS    2025250    200200   22.2000  148.1500       9.0        80       867        92
VIS    2025250    200200   22.2100  148.1400       8.4        83       874        95
VIS    2025250    200200   22.2000  148.0900       7.8        85       905        99
VIS    2025250    200200   22.2100  148.0900       7.8        87       905        99
VIS    2025250    200200   22.1900  148.0400       8.6        89       900        97
VIS    2025250    200200   22.1900  148.0400       8.5        89       889        96
VIS    2025250    200200   22.1900  147.9300      10.4        97       864        93
VIS    2025250    200200   22.1900  147.8900      10.0        99       869        92
VIS    2025250    200200   22.1900  147.8900       9.8        99       870        91
VIS    2025250    200200   22.2000  147.8400       8.9        95       874        98
VIS    2025250    200200   22.1900  147.8400       8.6        95       874        98
VIS    2025250    200200   22.2000  147.7900       8.3        91       872        94
VIS    2025250    200200   22.2000  147.7900       8.4        90       872        93
VIS    2025250    200200   22.2000  147.7400      10.2       100       856        91
VIS    2025250    200200   22.2100  147.7400       9.9       103       854        94
VIS    2025250    200200   22.2000  147.6900       8.1       101       856        97
VIS    2025250    200200   22.2000  147.6700       7.8        92       872        98
VIS    2025250    200200   22.1900  147.6400       8.8        88       894        99
VIS    2025250    200200   22.1900  147.6300       8.7        87       894        99
VIS    2025250    200200   22.2000  147.6000       8.5        85       917        97
VIS    2025250    200200   22.2000  147.5800       8.7        88       917        97
VIS    2025250    200200   22.2000  147.5400       9.2        94       928        97
VIS    2025250    200200   22.1900  147.5100      10.1        92       907        97
VIS    2025250    200200   22.1900  147.4900      10.1        92       894        96
VIS    2025250    200200   22.2000  147.4700       9.5        92       894        94
VIS    2025250    200200   22.1800  147.4100      10.8        86       884        96
VIS    2025250    200200   22.2000  147.3800      10.2        90       884        98
VIS    2025250    200200   22.2000  147.3600       9.7        94       888        98
VIS    2025250    200200   22.2000  147.3500       9.7        93       888        96
VIS    2025250    200200   22.2000  147.3300      10.3        91       890        97
VIS    2025250    200200   22.1900  147.2800      10.4        85       903        99
VIS    2025250    200200   22.1800  147.2600       9.9        86       906        99
VIS    2025250    200200   22.1800  147.2500       9.8        86       906        99
VIS    2025250    200200   22.1800  147.2100       9.4        86       909        98
VIS    2025250    200200   22.1800  147.1900       9.0        87       906        98
VIS    2025250    200200   22.2000  147.1700       9.0        91       874        98
VIS    2025250    200200   22.1900  147.1300       8.9        89       872        95
VIS    2025250    200200   22.1900  147.1300       9.0        90       872        97
VIS    2025250    200200   22.2000  147.0800      10.0        87       886        98
VIS    2025250    200200   22.1900  147.0700      10.8        85       909        99
VIS    2025250    200200   22.1900  147.0300      12.5        87       909        98
VIS    2025250    200200   22.2000  147.0200      12.4        86       907        98
VIS    2025250    200200   22.2000  147.0000      11.5        85       919        98
VIS    2025250    200200   22.1900  146.9700      11.0        87       931        97
VIS    2025250    200200   22.1800  146.9300      10.1        88       932        98
VIS    2025250    200200   22.1800  146.9200       9.9        87       931        97
VIS    2025250    200200   22.1800  146.8900      10.1        87       930        96
VIS    2025250    200200   22.1900  146.8500      10.7        85       927        96
VIS    2025250    200200   22.1900  146.8500      10.8        85       927        97
VIS    2025250    200200   22.2000  146.8200      11.3        86       927       100
VIS    2025250    200200   22.1800  146.8000      11.9        84       925       100
VIS    2025250    200200   22.1900  146.7700      12.0        81       923        99
VIS    2025250    200200   22.2000  146.7400      13.6        80       915        96
VIS    2025250    200200   22.1700  146.7000      11.1        84       906        99
VIS    2025250    200200   22.1700  146.6800      10.7        84       906        99
VIS    2025250    200200   22.1800  146.6700      11.0        84       908        99
VIS    2025250    200200   22.1900  146.6300      12.2        83       938       100
VIS    2025250    200200   22.1800  146.5900      11.2        86       966        98
VIS    2025250    200200   22.1900  146.5500      12.2        87       951        99
VIS    2025250    200200   22.1800  146.5400      12.1        87       951        98
VIS    2025250    200200   22.1800  146.5100      11.9        85       910        98
VIS    2025250    200200   22.1900  146.4800      11.5        79       908        94
VIS    2025250    200200   22.1900  146.4600      12.3        79       909        91
VIS    2025250    200200   22.1800  146.4200      12.9        83       918        98
VIS    2025250    200200   22.1900  146.3700      12.4        80       918        98
VIS    2025250    200200   22.1900  146.3600      12.8        81       918        98
VIS    2025250    200200   22.1900  146.3200      11.7        84       915       100
VIS    2025250    200200   22.1700  146.3000      12.3        86       923       100
VIS    2025250    200200   22.1700  146.2700      12.5        86       930       100
VIS    2025250    200200   22.1800  146.1600      13.4        86       969        94
VIS    2025250    200200   22.1800  146.1400      13.5        86      1000        98
VIS    2025250    200200   22.1700  146.1000      13.7        86       995        95
VIS    2025250    200200   22.1800  146.0700      13.3        87       943        97
VIS    2025250    200200   22.1900  146.0600      12.9        87       942        97
VIS    2025250    200200   22.1800  146.0400      12.6        87       942        97
VIS    2025250    200200   22.1700  146.0100      11.6        88       943        97
VIS    2025250    200200   22.1900  145.9900      11.0        91       937        97
VIS    2025250    200200   22.1800  145.8000      12.7        90       968        99
VIS    2025250    200200   22.1800  145.7800      12.6        90       954        99
VIS    2025250    200200   22.1800  145.7500      12.8        90       916        99
VIS    2025250    200200   22.1600  145.7300      13.1        89       910        98
VIS    2025250    200200   22.1700  145.6900      12.8        92       913        99
VIS    2025250    200200   22.1700  145.6900      12.6        92       913        99
VIS    2025250    200200   22.1800  145.6500      13.3        90       916        99
VIS    2025250    200200   22.1800  145.6400      13.5        90       913        99
VIS    2025250    200200   22.1800  145.6100      13.7        88       929        98
VIS    2025250    200200   22.1800  145.5700      13.4        89       890        94
VIS    2025250    200200   22.1800  145.5200      12.6        89       908        98
VIS    2025250    200200   22.1600  145.4900      14.3        91       913        96
VIS    2025250    200200   22.1800  145.4600      13.5        85       915        98
VIS    2025250    200200   22.1700  145.2400      12.0        85       911        95
VIS    2025250    200200   22.1800  145.2300      12.2        83       918        94
VIS    2025250    200200   22.1800  145.1900      13.0        84       919        97
VIS    2025250    200200   22.1800  145.1800      13.2        84       919        97
VIS    2025250    200200   22.1700  145.1600      13.7        84       919        95
VIS    2025250    200200   22.1600  145.1200      12.3        87       919        96
VIS    2025250    200200   22.1600  145.1100      12.1        88       920        97
VIS    2025250    200200   22.1700  145.0700      12.0        92       920        99
VIS    2025250    200200   22.1700  145.0600      12.1        91       920        99
VIS    2025250    200200   22.1700  145.0400      11.9        92       920        97
VIS    2025250    200200   22.1600  144.9900      10.7        99       914        95
VIS    2025250    200200   22.1600  144.9900      10.5        99       914        95
VIS    2025250    200200   22.1600  144.9400      10.8        99       886       100
VIS    2025250    200200   22.1600  144.9200      12.5       100       818        92
VIS    2025250    200200   22.1600  144.9100      12.7        99       834        90
VIS    2025250    200200   22.1600  144.8500      12.3        96       827        91
VIS    2025250    200200   22.1700  144.7900      11.4        92       852        90
VIS    2025250    200200   22.1700  144.7600      11.1        94       888        97
VIS    2025250    200200   22.1700  144.3400      13.5        92       883        93
VIS    2025250    200200   22.1500  144.3200      13.1        91       916        97
VIS    2025250    200200   22.1500  144.3100      13.1        90       918        97
VIS    2025250    200200   22.1700  144.2800      13.0        90       930        97
VIS    2025250    200200   22.1500  144.2400      13.0        93       932        99
VIS    2025250    200200   22.1600  144.2400      13.2        93       932        99
VIS    2025250    200200   22.1600  144.2100      13.4        93       934        99
VIS    2025250    200200   22.1500  144.1900      13.0        92       941        99
VIS    2025250    200200   22.1600  144.1400      13.2        90       951        99
VIS    2025250    200200   22.1500  144.1200      13.0        90       952        98
VIS    2025250    200200   22.1500  144.0900      13.3        91       938        92
VIS    2025250    200200   22.1700  144.0700      13.3        90       938        92
VIS    2025250    200200   22.1500  144.0500      14.7        92       923        95
VIS    2025250    200200   22.1500  144.0300      15.1        91       923        94
VIS    2025250    200200   22.1500  144.0100      15.1        91       922        95
VIS    2025250    200200   22.1500  143.9800      14.1        91       921        97
VIS    2025250    200200   22.1600  143.9500      13.0        91       921        99
VIS    2025250    200200   22.1500  143.9300      12.5        90       920        99
VIS    2025250    200200   22.1500  143.9100      12.1        91       920       100
VIS    2025250    200200   22.1500  143.8900      12.0        93       920       100
VIS    2025250    200200   22.1600  143.8400      12.2        97       919        99
VIS    2025250    200200   22.1600  143.8300      12.6        96       923        99
VIS    2025250    200200   22.1600  143.7900      11.7        90       929       100
VIS    2025250    200200   22.1500  143.7700      10.9        88       931        99
VIS    2025250    200200   22.1500  143.7600      11.2        88       929        99
VIS    2025250    200200   22.1600  143.7400      12.3        86       924       100
VIS    2025250    200200   22.1700  143.7100      13.2        90       924        98
VIS    2025250    200200   22.1600  143.6700      13.6        87       925        98
VIS    2025250    200200   22.1600  143.6500      13.3        88       928        97
VIS    2025250    200200   22.1400  143.6300      12.5        91       924        97
VIS    2025250    200200   22.1500  143.6000      13.2        96       924        97
VIS    2025250    200200   22.1400  143.5700      12.8        94       925        99
VIS    2025250    200200   22.1600  143.5500      11.8        92       926       100
VIS    2025250    200200   22.1600  143.5300      11.9        90       937       100
VIS    2025250    200200   22.1400  143.4900      13.6        93       937        98
VIS    2025250    200200   22.1500  143.4900      13.6        94       939        98
VIS    2025250    200200   22.1400  143.4400      13.5        94       941        98
VIS    2025250    200200   22.1500  143.4200      13.6        94       942        98
VIS    2025250    200200   22.1400  143.3900      13.2        92       941        99
VIS    2025250    200200   22.1600  143.3800      13.3        92       941        98
VIS    2025250    200200   22.1600  143.3500      12.4        93       938        98
VIS    2025250    200200   22.1600  143.3300      12.7        94       938        98
VIS    2025250    200200   22.1400  143.3100      12.7        93       930        98
VIS    2025250    200200   22.1400  143.2700      12.4        94       930        99
VIS    2025250    200200   22.1600  143.2400      12.3        92       925        99
VIS    2025250    200200   22.1500  143.2400      12.5        91       925       100
VIS    2025250    200200   22.1400  143.2000      12.9        90       925        98
VIS    2025250    200200   22.1600  143.1900      12.7        90       926        98
VIS    2025250    200200   22.1500  143.1500      13.4        90       928        97
VIS    2025250    200200   22.1600  143.1400      13.4        89       928        98
VIS    2025250    200200   22.1500  143.1000      12.9        95       950        98
VIS    2025250    200200   22.1400  143.0900      12.6        94       950        98
VIS    2025250    200200   22.1400  143.0600      11.6        90       961        99
VIS    2025250    200200   22.1500  143.0100      12.2        92       998        99
VIS    2025250    200200   22.1600  142.9800      12.3        93       991        99
VIS    2025250    200200   22.1400  142.9500      12.6        92       947        96
VIS    2025250    200200   22.1500  142.9400      12.5        93       946        95
VIS    2025250    200200   22.1500  142.9000      11.7        93       932        98
VIS    2025250    200200   22.1400  142.8700      11.3        90       935       100
VIS    2025250    200200   22.1400  142.8700      11.3        90       935       100
VIS    2025250    200200   22.1500  142.6200      10.1        96       993        93
VIS    2025250    200200   22.1500  142.6100      10.3        95       982        93
VIS    2025250    200200   22.1600  142.5700      10.5        87       932        99
VIS    2025250    200200   22.1500  142.5700      10.2        86       938        99
VIS    2025250    200200   22.1400  142.5300      10.9        93       928        99
VIS    2025250    200200   22.1400  142.5100      11.4        95       928        99
VIS    2025250    200200   22.1400  142.4900      11.7        95       928        99
VIS    2025250    200200   22.1400  142.4600      11.5        92       928        98
VIS    2025250    200200   22.1500  142.4400      11.6        89       927        98
VIS    2025250    200200   22.2400  151.8200       6.7        78       932        95
VIS    2025250    200200   22.2200  151.7900       6.6        82       884        97
VIS    2025250    200200   22.2300  151.7600       6.3        75       860        96
VIS    2025250    200200   22.2300  151.7000       5.2        73       858        91
VIS    2025250    200200   22.2400  151.5600       4.9        93       969        94
VIS    2025250    200200   22.2200  151.5300       4.8        90       942        94
VIS    2025250    200200   22.2300  151.5100       5.7        89       893        99
VIS    2025250    200200   22.2300  151.5000       5.8        88       888       100
VIS    2025250    200200   22.2400  151.4600       6.1        83       894        95
VIS    2025250    200200   22.2000  150.6100       8.3        94       978        91
VIS    2025250    200200   22.2000  150.5800       7.6        94       967        93
VIS    2025250    200200   22.2100  150.5600       6.8       102       971        93
VIS    2025250    200200   22.2000  150.4500       9.2        98       875        97
VIS    2025250    200200   22.2200  150.4200       9.6       101       838        96
VIS    2025250    200200   22.2000  150.2100       8.2        94       874        94
VIS    2025250    200200   22.2000  150.2000       7.8        92       875        94
VIS    2025250    200200   22.2000  150.1800       7.4        89       887        91
VIS    2025250    200200   22.2200  150.1600       7.1        93       887        92
VIS    2025250    200200   22.1900  150.0600       8.3        89       964        93
VIS    2025250    200200   22.1800  149.3200       9.7        99       940        95
VIS    2025250    200200   22.1900  149.3100       9.6       100       940        95
VIS    2025250    200200   22.2000  149.2900       9.4       101       940        95
VIS    2025250    200200   22.2000  149.2500      10.0       101       947        93
VIS    2025250    200200   22.1800  149.2200       9.6        99       950        93
VIS    2025250    200200   22.1800  149.2100       9.2        99       945        94
VIS    2025250    200200   22.1900  149.1700       8.8        96       919        98
VIS    2025250    200200   22.2000  149.1500       8.8        97       913        97
VIS    2025250    200200   22.2000  149.1300       8.5        98       900        98
VIS    2025250    200200   22.2000  149.0900       8.4        93       889        99
VIS    2025250    200200   22.1800  149.0800       8.9        97       889        98
VIS    2025250    200200   22.1800  149.0500       9.6        98       891        95
VIS    2025250    200200   22.1900  149.0100       9.0        89       935        98
VIS    2025250    200200   22.1800  149.0000       8.8        89       941        98
VIS    2025250    200200   22.1800  148.9800       8.6        88       953        94
VIS    2025250    200200   22.2000  148.9300       8.6        83       986        98
VIS    2025250    200200   22.2000  148.9300       7.5        84       986        95
VIS    2025250    200200   22.1800  148.8800       8.3        86       971        99
VIS    2025250    200200   22.1800  148.8700       8.8        87       937        99
VIS    2025250    200200   22.2000  148.8400       9.1        86       932        99
VIS    2025250    200200   22.1800  148.8000       7.5        89       918        99
VIS    2025250    200200   22.1800  148.8000       7.5        89       921        99
VIS    2025250    200200   22.1900  148.7800       7.8        88       921       100
VIS    2025250    200200   22.1800  148.7300       8.7        90       884        99
VIS    2025250    200200   22.1800  148.7200       8.8        90       853        94
VIS    2025250    200200   22.1700  148.6800       9.1        85       805        91
VIS    2025250    200200   22.1900  148.6700       9.5        84       805        90
VIS    2025250    200200   22.1800  148.6400       9.2        84       832        90
VIS    2025250    200200   22.1900  148.6200       9.8        82       875        92
VIS    2025250    200200   22.1900  148.5800       9.4        81       900        96
VIS    2025250    200200   22.1800  148.5700       9.2        83       927        99
VIS    2025250    200200   22.1700  148.5400       9.0        83       857        90
VIS    2025250    200200   22.1900  148.5000       9.6        84       799        90
VIS    2025250    200200   22.1800  148.4900       9.6        85       799        91
VIS    2025250    200200   22.1700  148.4600       9.5        90       798        93
VIS    2025250    200200   22.1900  148.4200       9.3        92       831        94
VIS    2025250    200200   22.1900  148.4100       9.5        92       835        93
VIS    2025250    200200   22.1900  148.3900       9.5        91       844        92
VIS    2025250    200200   22.1700  148.3500       9.0        82       797        90
VIS    2025250    200200   22.1700  148.3000       9.2        84       840        91
VIS    2025250    200200   22.1900  148.2900       9.6        87       849        91
VIS    2025250    200200   22.1700  148.2100       9.7        84       854        90
VIS    2025250    200200   22.1700  148.1900       9.1        83       861        92
VIS    2025250    200200   22.1800  148.1500       9.2        81       867        92
VIS    2025250    200200   22.1800  148.1400       9.0        80       889        95
VIS    2025250    200200   22.1800  148.1100       8.1        79       889        97
VIS    2025250    200200   22.1700  148.0800       8.4        87       911        99
VIS    2025250    200200   22.1800  148.0400       8.5        89       889        96
VIS    2025250    200200   22.1900  148.0400       8.4        89       889        95
VIS    2025250    200200   22.1600  147.9900       8.6        90       854        93
VIS    2025250    200200   22.1600  147.9600       9.3        93       864        96
VIS    2025250    200200   22.1600  147.9600       9.4        93       864        96
VIS    2025250    200200   22.1600  147.9200       9.5        94       864        94
VIS    2025250    200200   22.1700  147.9000       9.8        96       870        95
VIS    2025250    200200   22.1800  147.8700       9.2        98       877        92
VIS    2025250    200200   22.1700  147.8600       8.3        98       877        92
VIS    2025250    200200   22.1600  147.8100       7.0        96       872        95
VIS    2025250    200200   22.1800  147.8100       7.6        95       872        98
VIS    2025250    200200   22.1800  147.7800       8.6        94       867        96
VIS    2025250    200200   22.1800  147.7400      10.3        98       852        90
VIS    2025250    200200   22.1800  147.7300      10.0       103       852        93
VIS    2025250    200200   22.1600  147.7000       9.6        94       863        97
VIS    2025250    200200   22.1800  147.6600       8.8        91       880        99
VIS    2025250    200200   22.1800  147.6600       8.9        91       892        99
VIS    2025250    200200   22.1700  147.6200       8.3        89       906        97
VIS    2025250    200200   22.1700  147.5900       7.7        87       894        96
VIS    2025250    200200   22.1700  147.5600       9.0        94       886        99
VIS    2025250    200200   22.1700  147.5400       9.3        92       894        99
VIS    2025250    200200   22.1800  147.5300       9.6        92       906        99
VIS    2025250    200200   22.1800  147.5000       9.3        89       888        95
VIS    2025250    200200   22.1600  147.4500       9.3        84       878        96
VIS    2025250    200200   22.1800  147.4100      10.9        86       884        96
VIS    2025250    200200   22.1600  147.3800       9.4        88       890        99
VIS    2025250    200200   22.1800  147.3700       9.8        90       890        99
VIS    2025250    200200   22.1700  147.3400       9.6        85       892        96
VIS    2025250    200200   22.1600  147.3100      10.5        81       906        97
VIS    2025250    200200   22.1700  147.2900      10.3        84       906        99
VIS    2025250    200200   22.1800  147.2600       9.9        86       906        99
VIS    2025250    200200   22.1500  147.2400       9.4        84       907        99
VIS    2025250    200200   22.1700  147.2100       9.3        85       909        98
VIS    2025250    200200   22.1700  147.2000       9.2        85       909        98
VIS    2025250    200200   22.1700  147.1700       8.7        87       874        93
VIS    2025250    200200   22.1700  147.0600      11.6        84       947       100
VIS    2025250    200200   22.1500  147.0300      12.8        87       958        98
VIS    2025250    200200   22.1700  147.0100      12.3        86       944        98
VIS    2025250    200200   22.1500  146.9800      11.6        88       942        97
VIS    2025250    200200   22.1600  146.9600      10.7        88       934        96
VIS    2025250    200200   22.1700  146.9300       9.9        88       932        97
VIS    2025250    200200   22.1700  146.9200       9.7        87       931        97
VIS    2025250    200200   22.1700  146.9000      10.0        86       930        96
VIS    2025250    200200   22.1600  146.8700      10.1        87       925        96
VIS    2025250    200200   22.1500  146.8500      11.1        87       925        97
VIS    2025250    200200   22.1600  146.8000      12.5        85       925        99
VIS    2025250    200200   22.1600  146.7900      12.2        85       920        99
VIS    2025250    200200   22.1600  146.7700      12.0        86       919        99
VIS    2025250    200200   22.1500  146.7300      11.0        87       908        99
VIS    2025250    200200   22.1700  146.7000      10.9        85       906        99
VIS    2025250    200200   22.1500  146.6800      10.6        86       906        99
VIS    2025250    200200   22.1500  146.6700      10.9        85       908        99
VIS    2025250    200200   22.1500  146.6200      11.9        84       924       100
VIS    2025250    200200   22.1600  146.5900      10.9        86       978        95
VIS    2025250    200200   22.1700  146.5500      11.7        88       951        97
VIS    2025250    200200   22.1500  146.5400      12.1        86       950        91
VIS    2025250    200200   22.1600  146.5100      12.0        84       910        98
VIS    2025250    200200   22.1700  146.4700      12.6        81       906        95
VIS    2025250    200200   22.1600  146.4500      13.6        84       910        96
VIS    2025250    200200   22.1600  146.4200      13.5        85       918        98
VIS    2025250    200200   22.1500  146.4000      12.7        83       920        99
VIS    2025250    200200   22.1500  146.3800      12.6        82       920        97
VIS    2025250    200200   22.1500  146.3600      13.1        82       920        96
VIS    2025250    200200   22.1400  146.3300      12.6        85       925       100
VIS    2025250    200200   22.1500  146.3100      12.6        85       923       100
VIS    2025250    200200   22.1600  146.2900      12.8        86       930        99
VIS    2025250    200200   22.1400  146.2400      10.9        91       941        96
VIS    2025250    200200   22.1600  146.2200      11.9        89       938        92
VIS    2025250    200200   22.1600  146.0900      13.8        87       995        96
VIS    2025250    200200   22.1600  146.0600      13.8        87       971        99
VIS    2025250    200200   22.1500  146.0200      12.7        86       958        99
VIS    2025250    200200   22.1500  145.7900      13.4        90       968        96
VIS    2025250    200200   22.1500  145.7600      13.4        89       933        98
VIS    2025250    200200   22.1500  145.7500      13.3        88       928        99
VIS    2025250    200200   22.1500  145.5000      14.2        90       908        97
VIS    2025250    200200   22.1500  145.2500      11.9        85       905        96
VIS    2025250    200200   22.1300  145.2100      12.3        86       913        98
VIS    2025250    200200   22.1400  145.1800      13.0        87       916        97
VIS    2025250    200200   22.1500  145.1700      13.4        85       919        97
VIS    2025250    200200   22.1300  145.1300      12.2        87       917        93
VIS    2025250    200200   22.1300  145.1200      12.3        87       917        96
VIS    2025250    200200   22.1400  145.0900      11.7        90       918        98
VIS    2025250    200200   22.1500  145.0700      11.6        92       918        98
VIS    2025250    200200   22.1300  145.0300      11.8        97       903        96
VIS    2025250    200200   22.1400  145.0100      10.9       102       907        97
VIS    2025250    200200   22.1500  144.9900      10.5       100       910        95
VIS    2025250    200200   22.1500  144.9800      10.0        99       907        96
VIS    2025250    200200   22.1500  144.9400      10.8       102       818        96
VIS    2025250    200200   22.1500  144.9200      12.1       100       818        93
VIS    2025250    200200   22.1500  144.8600      11.8        99       827        93
VIS    2025250    200200   22.1300  144.3300      11.3        94       884        91
VIS    2025250    200200   22.1500  144.3200      12.7        91       916        98
VIS    2025250    200200   22.1300  144.2800      12.7        92       926        99
VIS    2025250    200200   22.1400  144.2700      12.6        92       932        99
VIS    2025250    200200   22.1200  144.2400      13.1        94       932        98
VIS    2025250    200200   22.1300  144.2100      13.6        94       939        98
VIS    2025250    200200   22.1200  144.1800      13.2        93       939        99
VIS    2025250    200200   22.1300  144.1600      13.0        91       945        99
VIS    2025250    200200   22.1300  144.1500      13.0        90       947        99
VIS    2025250    200200   22.1300  144.1100      13.1        92       938        95
VIS    2025250    200200   22.1400  144.1000      13.3        91       938        93
VIS    2025250    200200   22.1300  144.0700      14.2        94       922        96
VIS    2025250    200200   22.1400  144.0400      14.8        92       923        95
VIS    2025250    200200   22.1200  144.0200      14.1        91       921        97
VIS    2025250    200200   22.1400  143.9900      14.2        92       921        97
VIS    2025250    200200   22.1200  143.9700      13.3        90       921        98
VIS    2025250    200200   22.1300  143.9400      13.2        91       920        99
VIS    2025250    200200   22.1400  143.9200      12.7        90       921        99
VIS    2025250    200200   22.1300  143.9000      12.6        92       921       100
VIS    2025250    200200   22.1400  143.8700      12.2        94       920       100
VIS    2025250    200200   22.1400  143.8500      12.2        96       922        99
VIS    2025250    200200   22.1300  143.8100      12.4        95       924        99
VIS    2025250    200200   22.1300  143.8000      12.0        93       929       100
VIS    2025250    200200   22.1400  143.7800      11.2        90       931        99
VIS    2025250    200200   22.1300  143.7500      11.3        92       928        99
VIS    2025250    200200   22.1300  143.7100      12.6        96       922        98
VIS    2025250    200200   22.1200  143.7000      12.3        95       924        99
VIS    2025250    200200   22.1300  143.6700      12.4        91       924        99
VIS    2025250    200200   22.1400  143.6500      12.5        89       924        98
VIS    2025250    200200   22.1400  143.6300      12.6        91       923        98
VIS    2025250    200200   22.1200  143.5900      14.2        92       925        97
VIS    2025250    200200   22.1200  143.5600      13.6        93       926        98
VIS    2025250    200200   22.1300  143.5300      12.8        91       926        98
VIS    2025250    200200   22.1400  143.5200      13.0        90       928        99
VIS    2025250    200200   22.1300  143.4800      13.7        92       937        98
VIS    2025250    200200   22.1200  143.4800      13.4        93       938        98
VIS    2025250    200200   22.1200  143.4400      13.1        95       946        98
VIS    2025250    200200   22.1200  143.4100      12.8        92       949        99
VIS    2025250    200200   22.1300  143.3900      12.6        92       947        99
VIS    2025250    200200   22.1300  143.3700      12.3        92       929        99
VIS    2025250    200200   22.1300  143.3500      12.7        95       929        99
VIS    2025250    200200   22.1300  143.3200      12.4        94       929        97
VIS    2025250    200200   22.1300  143.2800      12.2        94       930        99
VIS    2025250    200200   22.1300  143.2800      12.2        94       930        99
VIS    2025250    200200   22.1400  143.2500      12.3        94       930        99
VIS    2025250    200200   22.1200  143.2200      12.7        92       925        99
VIS    2025250    200200   22.1300  143.1800      13.1        93       925        97
VIS    2025250    200200   22.1300  143.1700      13.1        93       926        97
VIS    2025250    200200   22.1300  143.1400      14.2        93       928        95
VIS    2025250    200200   22.1200  143.1100      13.7        95       933        97
VIS    2025250    200200   22.1200  143.1000      13.4        95       943        97
VIS    2025250    200200   22.1100  143.0700      11.7        89       944       100
VIS    2025250    200200   22.1200  143.0500      11.6        89       944       100
VIS    2025250    200200   22.1200  143.0300      11.8        90       986        99
VIS    2025250    200200   22.1300  142.9800      11.7        93       981        99
VIS    2025250    200200   22.1300  142.9600      12.3        92       956        98
VIS    2025250    200200   22.1300  142.9400      12.5        92       946        95
VIS    2025250    200200   22.1300  142.9300      12.4        91       946        94
VIS    2025250    200200   22.1200  142.9000      11.7        90       950        96
VIS    2025250    200200   22.1300  142.8700      11.4        89       950        99
VIS    2025250    200200   22.1300  142.8500      11.3        91       945        99
VIS    2025250    200200   22.1300  142.6000       9.6        95       984        91
VIS    2025250    200200   22.1300  142.5700       9.5        90       962        98
VIS    2025250    200200   22.1300  142.5500      10.3        91       932        99
VIS    2025250    200200   22.1200  142.5400      10.3        94       932        99
VIS    2025250    200200   22.1300  142.5100      11.6        95       929        99
VIS    2025250    200200   22.1300  142.4700      11.6        94       928        99
VIS    2025250    200200   22.1300  142.4500      11.5        92       928        99
VIS    2025250    200200   22.1300  142.4200      11.7        90       928        98
VIS    2025250    200200   22.2000  151.8400       7.0        86       998        92
VIS    2025250    200200   22.2000  151.8100       7.2        82       953        94
VIS    2025250    200200   22.2100  151.8000       6.9        81       922        97
VIS    2025250    200200   22.2200  151.7600       6.5        76       862        95
VIS    2025250    200200   22.2000  151.7500       6.5        76       871        96
VIS    2025250    200200   22.2000  151.7100       5.8        82       860        97
VIS    2025250    200200   22.2200  151.7000       5.2        77       860        96
VIS    2025250    200200   22.2100  151.5300       4.6        87       942        95
VIS    2025250    200200   22.1900  150.6200       8.8        96       978        90
VIS    2025250    200200   22.2000  150.5800       7.9        94       967        92
VIS    2025250    200200   22.1900  150.5700       7.7        94       967        94
VIS    2025250    200200   22.1800  150.5300       7.6        97       962        94
VIS    2025250    200200   22.1800  150.5200       7.4        98       966        94
VIS    2025250    200200   22.1900  150.4500       9.0        99       925        90
VIS    2025250    200200   22.1900  150.4200       9.0       100       858        99
VIS    2025250    200200   22.1900  150.4200       9.1       100       854        99
VIS    2025250    200200   22.1800  150.3400       8.9        97       857        98
VIS    2025250    200200   22.1800  150.3100       8.8       100       902        95
VIS    2025250    200200   22.1900  150.2400       8.7        97       870        98
VIS    2025250    200200   22.1800  150.2100       7.9        92       879        95
VIS    2025250    200200   22.1900  150.0600       8.3        89       964        93
VIS    2025250    200200   22.1700  149.6400       9.5        93       970        96
VIS    2025250    200200   22.1700  149.3200       9.8        98       940        94
VIS    2025250    200200   22.1600  149.3100       9.6        98       940        95
VIS    2025250    200200   22.1800  149.2800       9.6        99       925        95
VIS    2025250    200200   22.1600  149.2600       9.3        98       925        96
VIS    2025250    200200   22.1700  149.2200       9.5        98       945        94
VIS    2025250    200200   22.1600  149.2100       9.9        97       928        95
VIS    2025250    200200   22.1800  149.1700       8.7        98       913        98
VIS    2025250    200200   22.1500  149.1500       8.4       101       910        97
VIS    2025250    200200   22.1500  149.1300       8.1        99       891        99
VIS    2025250    200200   22.1600  149.0900       8.4        97       891        98
VIS    2025250    200200   22.1600  149.0600       9.3       100       891        96
VIS    2025250    200200   22.1700  149.0500       9.6       100       899        94
VIS    2025250    200200   22.1500  149.0000       7.8        90       934        97
VIS    2025250    200200   22.1600  148.9800       8.3        87       953        96
VIS    2025250    200200   22.1600  148.9400       7.8        75       953        99
VIS    2025250    200200   22.1700  148.8900       8.4        88       966        98
VIS    2025250    200200   22.1700  148.8700       8.6        89       937        99
VIS    2025250    200200   22.1500  148.8400       8.8        89       925        99
VIS    2025250    200200   22.1700  148.8100       7.7        89       917        99
VIS    2025250    200200   22.1600  148.7900       7.7        88       912        99
VIS    2025250    200200   22.1600  148.7600       8.5        88       916       100
VIS    2025250    200200   22.1500  148.7400       8.8        86       891        98
VIS    2025250    200200   22.1600  148.7300       8.8        87       884        97
VIS    2025250    200200   22.1600  148.7000       9.0        87       822        92
VIS    2025250    200200   22.1700  148.6600       9.1        84       820        91
VIS    2025250    200200   22.1700  148.6400       9.0        85       861        90
VIS    2025250    200200   22.1600  148.6200       9.0        84       868        90
VIS    2025250    200200   22.1600  148.5800       9.7        83       923        98
VIS    2025250    200200   22.1600  148.5600       9.2        83       900        96
VIS    2025250    200200   22.1700  148.5400       9.0        83       900        97
VIS    2025250    200200   22.1500  148.4800       9.3        91       797        93
VIS    2025250    200200   22.1700  148.4500       9.3        92       800        94
VIS    2025250    200200   22.1700  148.4500       9.3        92       800        94
VIS    2025250    200200   22.1500  148.4100       9.1        90       800        92
VIS    2025250    200200   22.1400  148.3900       9.2        89       797        92
VIS    2025250    200200   22.1600  148.3500       9.0        83       797        90
VIS    2025250    200200   22.1400  148.3300       8.4        83       808        91
VIS    2025250    200200   22.1600  148.3000       9.0        83       840        91
VIS    2025250    200200   22.1600  148.2900       9.0        84       849        91
VIS    2025250    200200   22.1600  148.2700       9.4        86       853        90
VIS    2025250    200200   22.1500  148.2400      10.7        85       864        91
VIS    2025250    200200   22.1500  148.2100      10.6        84       899        97
VIS    2025250    200200   22.1500  148.1800       9.1        83       890        97
VIS    2025250    200200   22.1600  148.1700       9.1        83       869        93
VIS    2025250    200200   22.1400  148.1200       9.0        85       948        98
VIS    2025250    200200   22.1400  148.1000       9.0        87       948        98
VIS    2025250    200200   22.1500  148.0800       8.8        89       914        99
VIS    2025250    200200   22.1400  148.0600       9.1        91       875        96
VIS    2025250    200200   22.1400  148.0300       9.0        90       859        91
VIS    2025250    200200   22.1600  147.9900       8.5        90       854        93
VIS    2025250    200200   22.1600  147.9900       8.6        91       854        94
VIS    2025250    200200   22.1400  147.9400       9.5        92       864        94
VIS    2025250    200200   22.1500  147.9300       9.4        93       864        94
VIS    2025250    200200   22.1400  147.9000       9.1        94       879        96
VIS    2025250    200200   22.1600  147.8700       8.9        97       882        96
VIS    2025250    200200   22.1400  147.8200       7.5        98       877        90
VIS    2025250    200200   22.1400  147.8100       7.7        97       872        96
VIS    2025250    200200   22.1400  147.7800       7.9        95       862        98
VIS    2025250    200200   22.1600  147.7600       8.7        97       847        92
VIS    2025250    200200   22.1500  147.7100       9.8        97       863        96
VIS    2025250    200200   22.1600  147.7000       9.8        95       863        97
VIS    2025250    200200   22.1300  147.6800       9.2        93       880        97
VIS    2025250    200200   22.1300  147.6500       8.2        88       924        96
VIS    2025250    200200   22.1300  147.6100       7.9        90       892        98
VIS    2025250    200200   22.1400  147.6000       7.9        91       886        99
VIS    2025250    200200   22.1400  147.5700       8.6        92       874        97
VIS    2025250    200200   22.1500  147.5600       9.0        93       874        97
VIS    2025250    200200   22.1500  147.4600       9.1        84       878        95
VIS    2025250    200200   22.1500  147.4600       9.2        84       878        96
VIS    2025250    200200   22.1400  147.4200       9.6        82       882        96
VIS    2025250    200200   22.1400  147.3900       9.0        85       892        98
VIS    2025250    200200   22.1500  147.3800       8.9        86       896        99
VIS    2025250    200200   22.1300  147.3400       9.4        83       898        98
VIS    2025250    200200   22.1300  147.3300       9.7        81       907        99
VIS    2025250    200200   22.1400  147.2800       9.3        82       909        98
VIS    2025250    200200   22.1300  147.2600       9.2        82       912        98
VIS    2025250    200200   22.1400  147.2400       9.1        83       911        99
VIS    2025250    200200   22.1400  147.2100       8.7        81       911        96
VIS    2025250    200200   22.1500  147.2000       8.6        82       909        97
VIS    2025250    200200   22.1500  147.1400      10.0        88       919        93
VIS    2025250    200200   22.1500  147.0900      10.6        82       976        92
VIS    2025250    200200   22.1500  147.0700      11.5        83       976        96
VIS    2025250    200200   22.1500  147.0300      13.0        87       967        98
VIS    2025250    200200   22.1500  147.0300      12.9        87       967        98
VIS    2025250    200200   22.1300  146.9800      11.4        90       947        96
VIS    2025250    200200   22.1400  146.9700      11.1        89       942        94
VIS    2025250    200200   22.1500  146.9500       9.9        87       934        93
VIS    2025250    200200   22.1500  146.9200       8.9        85       932        91
VIS    2025250    200200   22.1500  146.9000       9.3        85       928        93
VIS    2025250    200200   22.1500  146.8500      10.5        87       925        97
VIS    2025250    200200   22.1500  146.8500      10.7        87       925        97
VIS    2025250    200200   22.1400  146.8200      11.9        85       925        99
VIS    2025250    200200   22.1300  146.7800      11.3        84       920        99
VIS    2025250    200200   22.1200  146.7700      11.2        86       919        98
VIS    2025250    200200   22.1300  146.7300      10.3        89       908        99
VIS    2025250    200200   22.1300  146.7000      10.2        88       906        99
VIS    2025250    200200   22.1400  146.6800      10.5        88       906        99
VIS    2025250    200200   22.1300  146.6700      10.4        87       906        99
VIS    2025250    200200   22.1200  146.6400      10.1        85       906        99
VIS    2025250    200200   22.1300  146.6100      10.4        85       938        98
VIS    2025250    200200   22.1400  146.6000      10.6        86       965        97
VIS    2025250    200200   22.1300  146.5500      12.5        85       962        96
VIS    2025250    200200   22.1300  146.5500      12.4        85       962        95
VIS    2025250    200200   22.1300  146.5200      11.9        87       913        95
VIS    2025250    200200   22.1200  146.4900      12.2        86       908        99
VIS    2025250    200200   22.1200  146.4500      12.5        85       913        99
VIS    2025250    200200   22.1300  146.4300      12.3        85       918        99
VIS    2025250    200200   22.1200  146.3900      12.7        82       927        99
VIS    2025250    200200   22.1300  146.3600      13.4        82       942        99
VIS    2025250    200200   22.1400  146.3300      12.7        85       936        99
VIS    2025250    200200   22.1400  146.2900      13.3        89       940        98
VIS    2025250    200200   22.1300  146.0500      14.2        87       973        97
VIS    2025250    200200   22.1200  145.2400      12.5        85       907        98
VIS    2025250    200200   22.1100  145.2200      13.1        86       907        97
VIS    2025250    200200   22.1300  145.1800      12.6        86       913        94
VIS    2025250    200200   22.1100  145.1600      12.5        87       912        96
VIS    2025250    200200   22.1100  145.1300      12.4        87       914        99
VIS    2025250    200200   22.1100  145.1000      12.1        88       913        98
VIS    2025250    200200   22.1100  145.0900      11.6        90       903        95
VIS    2025250    200200   22.1100  145.0500      10.5        98       842        91
VIS    2025250    200200   22.1300  145.0300      11.7        97       903        96
VIS    2025250    200200   22.1300  145.0200      11.6        98       898        96
VIS    2025250    200200   22.1300  144.9900      10.4       108       886        94
VIS    2025250    200200   22.1300  144.9500       9.9       106       812        97
VIS    2025250    200200   22.1100  144.3300       9.2       109       843        94
VIS    2025250    200200   22.1200  144.3100      11.0        99       891        99
VIS    2025250    200200   22.1200  144.3000      11.8        95       916        99
VIS    2025250    200200   22.1000  144.2600      12.9        91       923        97
VIS    2025250    200200   22.1000  144.2400      13.7        93       922        95
VIS    2025250    200200   22.1200  144.2200      13.7        94       931        97
VIS    2025250    200200   22.1200  144.1800      13.1        92       937        99
VIS    2025250    200200   22.1000  144.1600      13.3        92       931        99
VIS    2025250    200200   22.1000  144.1300      13.7        93       927        98
VIS    2025250    200200   22.1000  144.1100      13.6        93       927        98
VIS    2025250    200200   22.1100  144.0800      13.4        94       923        98
VIS    2025250    200200   22.1100  144.0700      13.6        95       922        98
VIS    2025250    200200   22.1000  144.0300      13.6        92       921        98
VIS    2025250    200200   22.1000  144.0200      13.7        92       921        98
VIS    2025250    200200   22.1000  144.0000      14.0        91       921        97
VIS    2025250    200200   22.1200  143.9700      13.4        90       921        98
VIS    2025250    200200   22.1000  143.9400      14.5        90       923        96
VIS    2025250    200200   22.1100  143.9100      13.6        91       922        98
VIS    2025250    200200   22.1100  143.8900      12.8        92       923        99
VIS    2025250    200200   22.1100  143.8600      12.3        92       923       100
VIS    2025250    200200   22.1000  143.8500      12.2        91       923       100
VIS    2025250    200200   22.1200  143.8100      12.3        95       924        99
VIS    2025250    200200   22.1200  143.8000      12.2        96       927        99
VIS    2025250    200200   22.1000  143.7500      11.4        93       934        97
VIS    2025250    200200   22.1100  143.7500      11.4        94       934        98
VIS    2025250    200200   22.1100  143.7200      12.1        97       922        98
VIS    2025250    200200   22.1000  143.6900      12.1        94       924        99
VIS    2025250    200200   22.0900  143.6600      12.2        92       924       100
VIS    2025250    200200   22.0900  143.6400      12.5        91       923        99
VIS    2025250    200200   22.1000  143.6200      13.9        91       924        98
VIS    2025250    200200   22.0900  143.5800      13.3        90       927        98
VIS    2025250    200200   22.1000  143.5600      13.0        91       928        97
VIS    2025250    200200   22.0900  143.5400      12.8        90       937        94
VIS    2025250    200200   22.0900  143.5200      13.2        90       944        97
VIS    2025250    200200   22.1000  143.4900      13.3        90       945        99
VIS    2025250    200200   22.1000  143.4700      13.2        93       946        98
VIS    2025250    200200   22.1000  143.4300      12.6        93       949        99
VIS    2025250    200200   22.1100  143.4200      12.6        92       959        99
VIS    2025250    200200   22.1000  143.3900      11.8        91       954        99
VIS    2025250    200200   22.1100  143.3600      11.8        93       939        99
VIS    2025250    200200   22.1100  143.3400      12.1        95       929        99
VIS    2025250    200200   22.1000  143.3300      12.0        94       930        98
VIS    2025250    200200   22.0900  143.3000      12.4        92       930        98
VIS    2025250    200200   22.1000  143.2700      12.9        94       930        98
VIS    2025250    200200   22.1100  143.2300      12.7        92       925        99
VIS    2025250    200200   22.1100  143.2200      12.6        92       925        99
VIS    2025250    200200   22.1100  143.1800      12.9        96       925        97
VIS    2025250    200200   22.0900  143.1600      13.5        93       953        97
VIS    2025250    200200   22.1100  143.1500      13.7        93       930        97
VIS    2025250    200200   22.1100  143.1100      13.7        94       943        97
VIS    2025250    200200   22.0900  143.0800      11.9        91       932        98
VIS    2025250    200200   22.1100  143.0700      11.7        89       944        99
VIS    2025250    200200   22.0900  143.0400      11.5        92       934        95
VIS    2025250    200200   22.0900  143.0200      11.3        94       943        98
VIS    2025250    200200   22.1100  143.0000      11.5        94       943        99
VIS    2025250    200200   22.0900  142.9600      11.9        94       953        97
VIS    2025250    200200   22.1100  142.9500      12.0        94       951        96
VIS    2025250    200200   22.1100  142.9100      12.0        90       951        93
VIS    2025250    200200   22.0900  142.8800      12.6        92       969        94
VIS    2025250    200200   22.1100  142.8700      11.8        90       964        98
VIS    2025250    200200   22.1000  142.5100      10.0        97       939        97
VIS    2025250    200200   22.1000  142.5000      11.3        96       939        98
VIS    2025250    200200   22.1100  142.4600      12.4        97       935        91
VIS    2025250    200200   22.1100  142.4300      12.1        93       940        92
VIS    2025250    200200   22.1900  151.8400       7.0        85       995        93
VIS    2025250    200200   22.1900  151.8100       7.1        81       953        94
VIS    2025250    200200   22.1900  151.8000       6.9        77       922        96
VIS    2025250    200200   22.1700  151.7700       6.4        74       916        97
VIS    2025250    200200   22.1800  151.7400       6.5        81       865        97
VIS    2025250    200200   22.1700  151.7200       6.2        85       864        99
VIS    2025250    200200   22.1700  151.6900       5.8        79       875        95
VIS    2025250    200200   22.1700  150.5900       8.4        94       967        91
VIS    2025250    200200   22.1600  150.5700       8.3        95       947        92
VIS    2025250    200200   22.1500  150.5300       8.7        98       918        93
VIS    2025250    200200   22.1500  150.5000       7.8        98       939        92
VIS    2025250    200200   22.1500  150.4300       9.7        90       907        92
VIS    2025250    200200   22.1700  150.4000       8.9        93       832        94
VIS    2025250    200200   22.1600  150.3600       8.9        93       832        93
VIS    2025250    200200   22.1500  150.3300       9.0        91       915        92
VIS    2025250    200200   22.1500  150.3100       8.7        95       915        94
VIS    2025250    200200   22.1600  150.2700       8.7        97       864        99
VIS    2025250    200200   22.1500  150.2600       8.6        95       877        98
VIS    2025250    200200   22.1400  150.2200       8.2        91       881        97
VIS    2025250    200200   22.1600  150.2000       8.1        92       892        95
VIS    2025250    200200   22.1500  150.0100       8.0        95       920        98
VIS    2025250    200200   22.1400  149.9900       8.0        96       930        99
VIS    2025250    200200   22.1600  149.6500       9.4        95       962        96
VIS    2025250    200200   22.1400  149.4300      10.6       103       943        91
VIS    2025250    200200   22.1500  149.4200      10.7       102       943        91
VIS    2025250    200200   22.1300  149.3800       9.7       101       945        93
VIS    2025250    200200   22.1300  149.3400       9.6       107       945        91
VIS    2025250    200200   22.1500  149.3100       9.5        98       940        96
VIS    2025250    200200   22.1400  149.2800       9.0       100       909        97
VIS    2025250    200200   22.1300  149.2700       9.1       101       909        97
VIS    2025250    200200   22.1500  149.2300       9.7        98       929        95
VIS    2025250    200200   22.1500  149.2200       9.7        98       929        95
VIS    2025250    200200   22.1500  149.1900      10.0        98       923        95
VIS    2025250    200200   22.1300  149.1500       8.1       100       904        97
VIS    2025250    200200   22.1500  149.1300       8.0        98       891        99
VIS    2025250    200200   22.1300  149.1100       8.0        92       888       100
VIS    2025250    200200   22.1300  149.0900       8.2        94       888        99
VIS    2025250    200200   22.1300  149.0400       8.3        95       923        97
VIS    2025250    200200   22.1300  149.0300       7.9        94       923        95
VIS    2025250    200200   22.1500  148.9700       8.0        84       969        97
VIS    2025250    200200   22.1400  148.9600       7.8        81       969        99
VIS    2025250    200200   22.1300  148.9400       7.5        80       942        99
VIS    2025250    200200   22.1400  148.9000       8.4        88       942        97
VIS    2025250    200200   22.1300  148.8900       8.5        89       942        97
VIS    2025250    200200   22.1500  148.8600       8.7        89       930        99
VIS    2025250    200200   22.1400  148.8200       8.1        89       913       100
VIS    2025250    200200   22.1200  148.7900       8.1        89       893       100
VIS    2025250    200200   22.1200  148.7800       8.3        89       912       100
VIS    2025250    200200   22.1400  148.7400       8.7        87       912        99
VIS    2025250    200200   22.1300  148.7300       8.8        86       916       100
VIS    2025250    200200   22.1400  148.7100       9.0        88       853        92
VIS    2025250    200200   22.1300  148.6700       8.8        87       795        90
VIS    2025250    200200   22.1400  148.5900       9.5        79       863        90
VIS    2025250    200200   22.1300  148.5000       9.1        88       796        92
VIS    2025250    200200   22.1200  148.4600       9.0        90       795        94
VIS    2025250    200200   22.1400  148.4400       9.2        92       796        94
VIS    2025250    200200   22.1200  148.4300       9.1        90       796        92
VIS    2025250    200200   22.1400  148.3900       9.2        88       797        92
VIS    2025250    200200   22.1300  148.3700       9.3        89       796        92
VIS    2025250    200200   22.1400  148.3300       8.5        84       808        91
VIS    2025250    200200   22.1400  148.3100       8.4        82       840        91
VIS    2025250    200200   22.1200  148.2900       8.3        88       859        93
VIS    2025250    200200   22.1300  148.2600       9.5        88       920        99
VIS    2025250    200200   22.1300  148.2400      10.3        87       921        97
VIS    2025250    200200   22.1200  148.1800       9.9        85       943        90
VIS    2025250    200200   22.1300  148.1300       8.9        85       953        96
VIS    2025250    200200   22.1400  148.1000       9.0        88       948        98
VIS    2025250    200200   22.1300  148.0800       8.8        90       932        98
VIS    2025250    200200   22.1300  148.0700       8.9        90       902        99
VIS    2025250    200200   22.1300  148.0400       9.2        91       862        92
VIS    2025250    200200   22.1300  148.0200       9.2        92       861        94
VIS    2025250    200200   22.1200  147.9900       9.1        92       861        93
VIS    2025250    200200   22.1100  147.9500       9.6        94       861        95
VIS    2025250    200200   22.1200  147.9400       9.4        93       866        94
VIS    2025250    200200   22.1300  147.9100       9.0        93       879        93
VIS    2025250    200200   22.1200  147.8900       9.0        97       882        99
VIS    2025250    200200   22.1200  147.8500       9.4        98       877        97
VIS    2025250    200200   22.1200  147.8300       9.1        95       874        97
VIS    2025250    200200   22.1300  147.8200       7.9        98       877        91
VIS    2025250    200200   22.1100  147.7900       8.8        97       864        98
VIS    2025250    200200   22.1300  147.7700       7.7        95       856        96
VIS    2025250    200200   22.1100  147.7300       9.4        95       865        96
VIS    2025250    200200   22.1100  147.7000       9.6        96       884        99
VIS    2025250    200200   22.1300  147.6800       9.3        94       880        98
VIS    2025250    200200   22.1300  147.6500       8.2        88       920        96
VIS    2025250    200200   22.1100  147.6200       7.3        79       848        90
VIS    2025250    200200   22.1100  147.6200       7.5        82       854        92
VIS    2025250    200200   22.1200  147.5800       8.6        89       872        94
VIS    2025250    200200   22.1300  147.5700       8.8        90       874        92
VIS    2025250    200200   22.1200  147.5200       8.7        84       874        95
VIS    2025250    200200   22.1100  147.5000       9.2        84       874        96
VIS    2025250    200200   22.1100  147.4700       8.8        83       892        96
VIS    2025250    200200   22.1100  147.4600       8.7        83       892        96
VIS    2025250    200200   22.1100  147.4200       8.8        81       898        98
VIS    2025250    200200   22.1100  147.3900       8.9        81       904        97
VIS    2025250    200200   22.1100  147.3900       8.9        81       902        96
VIS    2025250    200200   22.1100  147.3600       8.9        82       892        98
VIS    2025250    200200   22.1000  147.3200       9.4        81       909        98
VIS    2025250    200200   22.1200  147.3000       9.2        81       909        98
VIS    2025250    200200   22.1200  147.2800       9.0        82       912        97
VIS    2025250    200200   22.1200  147.2600       9.1        82       912        97
VIS    2025250    200200   22.1200  147.0400      14.5        86       985        97
VIS    2025250    200200   22.1200  147.0200      13.7        87       969        98
VIS    2025250    200200   22.1200  146.9900      11.9        91       950        96
VIS    2025250    200200   22.1200  146.9800      11.5        91       950        96
VIS    2025250    200200   22.1000  146.9400      10.0        87       933        98
VIS    2025250    200200   22.1100  146.9100       9.1        88       930        96
VIS    2025250    200200   22.1100  146.9000       9.0        87       928        91
VIS    2025250    200200   22.1000  146.8400       9.8        82       920        97
VIS    2025250    200200   22.1100  146.8300      10.3        83       920        98
VIS    2025250    200200   22.1100  146.8000      10.9        83       919        99
VIS    2025250    200200   22.1000  146.7600      10.6        90       919        99
VIS    2025250    200200   22.1000  146.7600      10.7        91       919        99
VIS    2025250    200200   22.1000  146.7300      10.6        92       908       100
VIS    2025250    200200   22.1100  146.7000      10.4        89       906        99
VIS    2025250    200200   22.1100  146.6800      10.7        88       906        98
VIS    2025250    200200   22.1200  146.6500      10.2        86       906        99
VIS    2025250    200200   22.1100  146.6100       9.8        87       938        97
VIS    2025250    200200   22.1100  146.6000      10.1        88       952        97
VIS    2025250    200200   22.1000  146.5800      10.5        89       952        98
VIS    2025250    200200   22.1100  146.5400      11.3        86       951        99
VIS    2025250    200200   22.1200  146.5200      11.2        86       920        93
VIS    2025250    200200   22.1000  146.5000      10.9        85       925        97
VIS    2025250    200200   22.1100  146.4600      11.9        84       918        99
VIS    2025250    200200   22.1100  146.4400      12.0        83       918        99
VIS    2025250    200200   22.1000  145.2300      13.2        84       881        92
VIS    2025250    200200   22.1000  145.2000      13.1        87       902        97
VIS    2025250    200200   22.0800  145.1900      13.9        88       882        92
VIS    2025250    200200   22.1000  145.1500      12.6        88       912        96
VIS    2025250    200200   22.0800  145.1300      12.1        91       889        95
VIS    2025250    200200   22.1000  145.1000      12.1        90       903        96
VIS    2025250    200200   22.1000  145.0900      11.6        91       898        95
VIS    2025250    200200   22.0800  144.3200      11.1       105       847        97
VIS    2025250    200200   22.0800  144.3100      11.7       104       853        96
VIS    2025250    200200   22.0900  144.2800      13.0        92       916        98
VIS    2025250    200200   22.0900  144.2400      13.7        94       922        95
VIS    2025250    200200   22.0900  144.2400      14.0        95       922        95
VIS    2025250    200200   22.0900  144.2000      14.4        95       922        97
VIS    2025250    200200   22.0700  144.1800      13.7        92       913        98
VIS    2025250    200200   22.0800  144.1400      13.9        93       923        98
VIS    2025250    200200   22.0800  144.1300      14.1        93       923        98
VIS    2025250    200200   22.0900  144.1000      13.7        93       922        98
VIS    2025250    200200   22.0900  144.0900      13.2        94       922        99
VIS    2025250    200200   22.0800  144.0600      12.8        94       918        99
VIS    2025250    200200   22.0800  144.0300      13.4        92       921        99
VIS    2025250    200200   22.0700  143.9900      13.8        92       923        97
VIS    2025250    200200   22.0700  143.9900      13.9        92       923        97
VIS    2025250    200200   22.0900  143.9500      14.7        90       923        96
VIS    2025250    200200   22.0700  143.9300      16.2        90       924        93
VIS    2025250    200200   22.0900  143.9000      14.3        91       923        97
VIS    2025250    200200   22.0900  143.8700      12.2        91       923       100
VIS    2025250    200200   22.0900  143.8600      12.2        91       923       100
VIS    2025250    200200   22.0700  143.8400      12.3        92       923        99
VIS    2025250    200200   22.0700  143.8100      12.7        92       932        97
VIS    2025250    200200   22.0900  143.7900      12.2        94       932        99
VIS    2025250    200200   22.0800  143.7600      11.6        94       932        98
VIS    2025250    200200   22.0700  143.7300      12.0        92       922        99
VIS    2025250    200200   22.0700  143.7000      12.6        93       924        99
VIS    2025250    200200   22.0700  143.6700      12.6        92       924        99
VIS    2025250    200200   22.0800  143.6600      12.4        92       924        99
VIS    2025250    200200   22.0800  143.6200      13.1        90       925        99
VIS    2025250    200200   22.0800  143.5900      13.0        88       928        98
VIS    2025250    200200   22.0800  143.5700      12.9        87       927        96
VIS    2025250    200200   22.0800  143.5500      12.7        89       937        92
VIS    2025250    200200   22.0800  143.5400      12.8        88       938        92
VIS    2025250    200200   22.0700  143.5000      12.4        86       949        99
VIS    2025250    200200   22.0700  143.4800      12.9        84       952       100
VIS    2025250    200200   22.0700  143.4400      11.7        86       961       100
VIS    2025250    200200   22.0700  143.4200      10.9        88       959        98
VIS    2025250    200200   22.0700  143.4100      10.9        89       959        99
VIS    2025250    200200   22.0700  143.3700      11.9        92       952        98
VIS    2025250    200200   22.0700  143.3500      11.9        93       940        98
VIS    2025250    200200   22.0700  143.3200      12.3        92       938        99
VIS    2025250    200200   22.0800  143.3000      12.7        91       938        99
VIS    2025250    200200   22.0800  143.2900      12.7        92       930        99
VIS    2025250    200200   22.0700  143.2600      13.2        94       941        98
VIS    2025250    200200   22.0900  143.2300      12.5        93       926        99
VIS    2025250    200200   22.0800  143.2200      12.1        92       927        99
VIS    2025250    200200   22.0800  143.1800      12.9        95       944        98
VIS    2025250    200200   22.0800  143.1600      13.4        93       953        97
VIS    2025250    200200   22.0700  143.1200      13.0        93       932        97
VIS    2025250    200200   22.0600  143.1200      12.9        93       930        97
VIS    2025250    200200   22.0800  143.0900      12.1        92       932        98
VIS    2025250    200200   22.0700  143.0700      11.5        91       932        92
VIS    2025250    200200   22.0800  143.0300      11.5        94       943        95
VIS    2025250    200200   22.0700  143.0000      11.8        95       953        98
VIS    2025250    200200   22.0800  142.9800      11.9        95       953        97
VIS    2025250    200200   22.0700  142.9500      11.8        94       956        96
VIS    2025250    200200   22.0700  142.9400      11.7        95       956        96
VIS    2025250    200200   22.0800  142.9000      12.6        94       963        96
VIS    2025250    200200   22.1600  151.8100       6.4        83       967        95
VIS    2025250    200200   22.1600  151.7800       6.2        76       922        95
VIS    2025250    200200   22.1700  151.7800       6.3        74       916        97
VIS    2025250    200200   22.1600  151.7500       6.2        79       876        96
VIS    2025250    200200   22.1400  151.7100       6.2        79       883        97
VIS    2025250    200200   22.1200  150.5500       9.2        98       915        92
VIS    2025250    200200   22.1200  150.5200       9.0        96       915        93
VIS    2025250    200200   22.1400  150.5000       7.9        97       939        92
VIS    2025250    200200   22.1200  150.4800       8.2        94       928        93
VIS    2025250    200200   22.1400  150.4200       9.8        88       907        90
VIS    2025250    200200   22.1200  150.3600       8.9        73       917        90
VIS    2025250    200200   22.1300  150.3000       8.8        95       915        92
VIS    2025250    200200   22.1400  150.2700       8.5        94       877        98
VIS    2025250    200200   22.1200  150.2400       8.2        88       877        95
VIS    2025250    200200   22.1400  150.2100       8.1        91       891        96
VIS    2025250    200200   22.1400  150.1900       8.1        91       912        91
VIS    2025250    200200   22.1200  150.0200       7.6        93       904        94
VIS    2025250    200200   22.1200  150.0000       7.5        94       920        96
VIS    2025250    200200   22.1400  149.9900       7.9        96       930        98
VIS    2025250    200200   22.1200  149.9600       7.8        93       971        90
VIS    2025250    200200   22.1100  149.4500       9.7       101       982        93
VIS    2025250    200200   22.1300  149.4300      10.4       106       965        90
VIS    2025250    200200   22.1300  149.3800       9.7       101       943        93
VIS    2025250    200200   22.1100  149.3500       9.2        94       945        96
VIS    2025250    200200   22.1100  149.3400       9.3        95       947        95
VIS    2025250    200200   22.1100  149.3000       9.4       100       921        96
VIS    2025250    200200   22.1200  149.2800       9.1       100       906        97
VIS    2025250    200200   22.1200  149.2500       9.3       101       906        96
VIS    2025250    200200   22.1100  149.2200      10.0        98       909        94
VIS    2025250    200200   22.1000  149.2000      10.5        95       909        94
VIS    2025250    200200   22.1100  149.1800       9.8        94       935        97
VIS    2025250    200200   22.1000  149.1500       8.6        94       935        97
VIS    2025250    200200   22.1000  149.1200       8.1        93       893       100
VIS    2025250    200200   22.1100  149.0900       8.2        94       886       100
VIS    2025250    200200   22.1200  149.0700       8.4        96       888        99
VIS    2025250    200200   22.1200  149.0400       8.1        95       923        96
VIS    2025250    200200   22.1000  148.9500       7.5        88       986        90
VIS    2025250    200200   22.1000  148.9200       7.9        89       922        99
VIS    2025250    200200   22.1200  148.9100       8.2        87       925        99
VIS    2025250    200200   22.1000  148.8600       8.1        82       925        99
VIS    2025250    200200   22.1000  148.8400       8.2        83       914       100
VIS    2025250    200200   22.1000  148.8200       8.2        85       893        99
VIS    2025250    200200   22.1100  148.7900       8.2        89       887        99
VIS    2025250    200200   22.1100  148.7800       8.3        88       912       100
VIS    2025250    200200   22.1000  148.7500       8.5        84       937       100
VIS    2025250    200200   22.1100  148.7200       8.8        83       891        96
VIS    2025250    200200   22.1000  148.6900       8.8        82       797        90
VIS    2025250    200200   22.1000  148.6500       8.4        82       862        90
VIS    2025250    200200   22.1100  148.6500       8.6        84       862        90
VIS    2025250    200200   22.1200  148.6100       9.2        80       857        90
VIS    2025250    200200   22.1000  148.5800       9.3        81       849        90
VIS    2025250    200200   22.1100  148.5400       9.4        84       799        90
VIS    2025250    200200   22.1100  148.5100       9.4        86       796        91
VIS    2025250    200200   22.0900  148.5000       9.6        85       797        90
VIS    2025250    200200   22.1100  148.4500       9.0        89       795        93
VIS    2025250    200200   22.1100  148.4300       9.2        90       798        92
VIS    2025250    200200   22.1100  148.4200       9.3        89       799        91
VIS    2025250    200200   22.1000  148.3900       9.4        88       799        91
VIS    2025250    200200   22.1000  148.3600       9.4        89       800        93
VIS    2025250    200200   22.1100  148.3400       8.9        87       801        93
VIS    2025250    200200   22.0900  148.3000       7.7        89       853        95
VIS    2025250    200200   22.1100  148.2800       8.3        89       876        96
VIS    2025250    200200   22.1100  148.2500       9.5        89       948        98
VIS    2025250    200200   22.0900  148.2000       9.8        86       982        92
VIS    2025250    200200   22.0900  148.1200       8.3        85       948        95
VIS    2025250    200200   22.1000  148.1100       8.2        86       948        95
VIS    2025250    200200   22.1000  148.0900       8.5        89       902        97
VIS    2025250    200200   22.1000  148.0700       8.8        92       884        92
VIS    2025250    200200   22.1100  148.0200       8.9        92       862        94
VIS    2025250    200200   22.1100  148.0000       9.0        92       861        95
VIS    2025250    200200   22.0900  147.9800       9.6        92       856        94
VIS    2025250    200200   22.1100  147.9600       9.6        93       859        95
VIS    2025250    200200   22.0900  147.9300       8.8        91       864        96
VIS    2025250    200200   22.0900  147.8900       8.1        90       874        94
VIS    2025250    200200   22.0900  147.8900       8.3        91       877        96
VIS    2025250    200200   22.1000  147.8500       9.2        96       874        96
VIS    2025250    200200   22.1000  147.8400       9.1        94       874        95
VIS    2025250    200200   22.0900  147.8100       9.6        97       864        92
VIS    2025250    200200   22.0800  147.7600       9.3        96       872        98
VIS    2025250    200200   22.0800  147.7600       9.1        95       872        98
VIS    2025250    200200   22.1000  147.7400       9.2        94       872        98
VIS    2025250    200200   22.1000  147.7100       9.4        95       884        98
VIS    2025250    200200   22.0800  147.6700       7.6        83       943        91
VIS    2025250    200200   22.0900  147.6500       7.0        78       904        91
VIS    2025250    200200   22.1000  147.6200       7.1        77       848        90
VIS    2025250    200200   22.1000  147.5800       8.1        84       869        91
VIS    2025250    200200   22.0900  147.5400       9.0        87       874        97
VIS    2025250    200200   22.1000  147.5100       9.2        84       874        96
VIS    2025250    200200   22.1000  147.5100       9.3        83       874        95
VIS    2025250    200200   22.0900  147.4700       8.2        80       894        95
VIS    2025250    200200   22.0800  147.4400       7.9        82       902        93
VIS    2025250    200200   22.1000  147.4100       8.9        82       904        96
VIS    2025250    200200   22.1000  147.4100       9.0        81       904        97
VIS    2025250    200200   22.1000  147.3600       8.8        83       892        97
VIS    2025250    200200   22.0900  147.3400       9.6        82       907        98
VIS    2025250    200200   22.1000  147.3200       9.6        82       907        98
VIS    2025250    200200   22.0800  147.2900       9.7        80       922        96
VIS    2025250    200200   22.0800  147.2600       9.9        76       928        97
VIS    2025250    200200   22.0900  147.2500       9.6        77       928        96
VIS    2025250    200200   22.1000  147.1200      13.0        91       977        95
VIS    2025250    200200   22.0800  147.0700      12.2        87       983        95
VIS    2025250    200200   22.0900  147.0400      13.7        87       984        96
VIS    2025250    200200   22.0800  147.0100      12.6        84       961        99
VIS    2025250    200200   22.0800  146.9900      11.7        84       955        98
VIS    2025250    200200   22.0900  146.9800      11.0        86       942        96
VIS    2025250    200200   22.0800  146.9400       9.8        85       933        98
VIS    2025250    200200   22.0900  146.9300       9.4        86       931        98
VIS    2025250    200200   22.0900  146.8300       9.1        81       917        97
VIS    2025250    200200   22.0800  146.8100       9.0        82       919        97
VIS    2025250    200200   22.0900  146.7900       9.4        86       919        98
VIS    2025250    200200   22.0700  146.7600      10.6        93       919        98
VIS    2025250    200200   22.0800  146.7500      10.9        93       910        98
VIS    2025250    200200   22.0900  146.7200      11.0        92       908       100
VIS    2025250    200200   22.0800  146.6800      10.9        90       906        99
VIS    2025250    200200   22.0800  146.6700      10.9        90       906        99
VIS    2025250    200200   22.0800  146.6300      10.8        89       906       100
VIS    2025250    200200   22.0800  146.6000      10.6        91       918        99
VIS    2025250    200200   22.0700  146.5900      10.9        92       913       100
VIS    2025250    200200   22.0800  146.5500      11.4        87       949        99
VIS    2025250    200200   22.0900  146.5500      11.1        86       950        99
VIS    2025250    200200   22.0900  146.5200      10.7        84       936        97
VIS    2025250    200200   22.0900  146.5000      11.2        84       925        98
VIS    2025250    200200   22.0900  146.4500      11.4        82       920        99
VIS    2025250    200200   22.0900  146.2600      13.5        86       971        93
VIS    2025250    200200   22.0700  146.2000      13.3        84       990       100
VIS    2025250    200200   22.0800  145.1900      13.9        89       882        93
VIS    2025250    200200   22.0800  145.1800      13.9        89       882        93
VIS    2025250    200200   22.0700  145.1400      12.5        92       889        94
VIS    2025250    200200   22.0800  145.1300      12.0        92       889        94
VIS    2025250    200200   22.0600  145.1000      10.6       107       787        95
VIS    2025250    200200   22.0500  144.3100      12.3        93       864        92
VIS    2025250    200200   22.0600  144.3100      12.7        93       864        91
VIS    2025250    200200   22.0600  144.2600      13.3        92       913        95
VIS    2025250    200200   22.0600  144.2500      13.3        93       918        97
VIS    2025250    200200   22.0500  144.2200      13.6        95       912        97
VIS    2025250    200200   22.0600  144.1900      13.8        94       894        95
VIS    2025250    200200   22.0600  144.1700      14.1        92       912        97
VIS    2025250    200200   22.0600  144.1600      14.0        92       914        97
VIS    2025250    200200   22.0700  144.1300      14.1        93       915        97
VIS    2025250    200200   22.0700  144.0900      13.2        92       915        98
VIS    2025250    200200   22.0500  144.0800      12.5        91       917        99
VIS    2025250    200200   22.0600  144.0400      13.5        91       918        98
VIS    2025250    200200   22.0600  144.0100      13.7        91       922        98
VIS    2025250    200200   22.0600  144.0100      13.7        91       922        97
VIS    2025250    200200   22.0600  143.9800      13.7        90       924        97
VIS    2025250    200200   22.0400  143.9400      15.3        90       924        95
VIS    2025250    200200   22.0700  143.9300      16.3        90       924        93
VIS    2025250    200200   22.0500  143.8900      13.0        90       924        99
VIS    2025250    200200   22.0400  143.8600      12.1        91       924       100
VIS    2025250    200200   22.0400  143.8400      12.5        91       930        99
VIS    2025250    200200   22.0500  143.8300      12.5        91       930        99
VIS    2025250    200200   22.0600  143.8000      12.5        92       933        99
VIS    2025250    200200   22.0400  143.7700      11.8        92       933        99
VIS    2025250    200200   22.0500  143.7400      11.9        90       926        99
VIS    2025250    200200   22.0400  143.7300      12.2        90       925        99
VIS    2025250    200200   22.0500  143.6900      13.0        88       925        99
VIS    2025250    200200   22.0600  143.6700      13.0        91       926        99
VIS    2025250    200200   22.0600  143.6400      12.7        92       927        99
VIS    2025250    200200   22.0500  143.6200      12.7        91       937        98
VIS    2025250    200200   22.0600  143.6100      12.6        90       928       100
VIS    2025250    200200   22.0500  143.5700      13.1        87       927        97
VIS    2025250    200200   22.0600  143.5400      12.6        85       927        95
VIS    2025250    200200   22.0400  143.5300      11.8        86       928        99
VIS    2025250    200200   22.0500  143.4900      12.5        83       929        99
VIS    2025250    200200   22.0500  143.4800      13.0        83       929        99
VIS    2025250    200200   22.0500  143.4600      13.1        84       942        99
VIS    2025250    200200   22.0400  143.4200      11.3        88       941        99
VIS    2025250    200200   22.0500  143.4000      11.3        90       941        99
VIS    2025250    200200   22.0400  143.3700      12.2        92       929        98
VIS    2025250    200200   22.0400  143.3400      12.6        92       930        99
VIS    2025250    200200   22.0600  143.3100      12.4        92       938        99
VIS    2025250    200200   22.0400  143.2900      12.7        93       941        99
VIS    2025250    200200   22.0400  143.2600      12.7        93       945        99
VIS    2025250    200200   22.0600  143.2600      13.0        94       941        99
VIS    2025250    200200   22.0400  143.2200      12.4        93       932        99
VIS    2025250    200200   22.0600  143.1900      12.3        94       944        98
VIS    2025250    200200   22.0500  143.1600      13.0        95       944        97
VIS    2025250    200200   22.0400  143.1600      13.0        95       934        96
VIS    2025250    200200   22.0500  143.1200      12.8        93       930        97
VIS    2025250    200200   22.0500  143.1100      12.6        92       930        98
VIS    2025250    200200   22.0400  143.0600      11.8        90       933        95
VIS    2025250    200200   22.0400  143.0400      12.2        92       950        95
VIS    2025250    200200   22.0400  143.0200      11.8        92       959        99
VIS    2025250    200200   22.0600  143.0000      11.7        93       964        99
VIS    2025250    200200   22.0600  142.9700      11.7        93       967        96
VIS    2025250    200200   22.0400  142.9400      11.9        95       958        96
VIS    2025250    200200   22.0400  142.9400      12.2        96       958        94
VIS    2025250    200200   22.0500  142.9100      12.8        94       958        96
VIS    2025250    200200   22.0400  142.8900      12.9        93       984        97
VIS    2025250    200200   22.0400  142.7600       7.5        94       990        93
VIS    2025250    200200   22.0400  142.7300       7.6        94       990        94
VIS    2025250    200200   22.1400  151.8500       7.3        87       990        93
VIS    2025250    200200   22.1300  151.8100       6.2        93       967        93
VIS    2025250    200200   22.1400  151.7800       5.8        81       953        92
VIS    2025250    200200   22.1300  151.7700       5.9        82       930        93
VIS    2025250    200200   22.1300  151.7300       6.4        82       892        97
VIS    2025250    200200   22.1300  151.7200       6.3        81       891        98
VIS    2025250    200200   22.1000  150.5500       9.3        96       915        92
VIS    2025250    200200   22.1100  150.5300       9.1        94       915        92
VIS    2025250    200200   22.1000  150.5100       9.2        93       905        93
VIS    2025250    200200   22.1100  150.4800       8.4        96       928        92
VIS    2025250    200200   22.1000  150.4600       8.2        93       939        92
VIS    2025250    200200   22.1000  150.2900       8.7        92       883        97
VIS    2025250    200200   22.1200  150.2800       8.6        92       883        97
VIS    2025250    200200   22.0900  150.2500       8.1        87       883        93
VIS    2025250    200200   22.1100  150.0100       7.5        93       894        94
VIS    2025250    200200   22.1100  149.9800       7.6        93       931        98
VIS    2025250    200200   22.0900  149.6800       8.2        90       963        98
VIS    2025250    200200   22.0900  149.4700       9.9        95       974        90
VIS    2025250    200200   22.0900  149.4400       9.8       100       974        92
VIS    2025250    200200   22.0800  149.4100      10.4       104       953        90
VIS    2025250    200200   22.0900  149.3800      10.1        98       931        93
VIS    2025250    200200   22.1000  149.3400       9.5        94       947        95
VIS    2025250    200200   22.1000  149.3100       9.5        99       921        96
VIS    2025250    200200   22.1000  149.2800       9.3        99       906        97
VIS    2025250    200200   22.0900  149.2700       9.2        98       892        97
VIS    2025250    200200   22.0900  149.2300       9.9        98       894        94
VIS    2025250    200200   22.0800  149.2200       9.9        95       901        94
VIS    2025250    200200   22.1000  149.1900      10.4        94       909        94
VIS    2025250    200200   22.0800  149.1700       9.4        92       943        97
VIS    2025250    200200   22.0900  149.1300       8.3        92       900        99
VIS    2025250    200200   22.0900  149.1100       8.3        92       880        99
VIS    2025250    200200   22.0900  149.1000       8.3        92       879        99
VIS    2025250    200200   22.0900  149.0700       8.4        95       891        99
VIS    2025250    200200   22.0800  149.0400       8.4        99       900        98
VIS    2025250    200200   22.0800  149.0100       8.3        96       904        92
VIS    2025250    200200   22.0700  148.9500       8.2        89       949        96
VIS    2025250    200200   22.0800  148.9300       8.3        89       908        99
VIS    2025250    200200   22.0700  148.9100       8.6        88       905        99
VIS    2025250    200200   22.0800  148.8700       8.5        84       908        99
VIS    2025250    200200   22.0700  148.8500       8.5        83       899        98
VIS    2025250    200200   22.0800  148.8400       8.4        83       914       100
VIS    2025250    200200   22.0800  148.8100       8.3        87       887        95
VIS    2025250    200200   22.0900  148.7900       8.3        89       893        95
VIS    2025250    200200   22.0800  148.7600       8.2        85       917        98
VIS    2025250    200200   22.0900  148.7200       9.0        82       867        92
VIS    2025250    200200   22.0900  148.7100       9.1        82       862        91
VIS    2025250    200200   22.0900  148.6800       8.7        81       797        90
VIS    2025250    200200   22.0800  148.6600       7.9        79       868        91
VIS    2025250    200200   22.0800  148.6400       8.0        82       883        94
VIS    2025250    200200   22.0900  148.6100       8.9        84       857        92
VIS    2025250    200200   22.0900  148.5700       9.4        84       809        91
VIS    2025250    200200   22.0800  148.5600       9.4        85       802        90
VIS    2025250    200200   22.0700  148.5200      10.1        86       798        90
VIS    2025250    200200   22.0700  148.4900       9.8        83       798        90
VIS    2025250    200200   22.0700  148.4800       9.5        82       802        90
VIS    2025250    200200   22.0800  148.4500       9.1        86       802        92
VIS    2025250    200200   22.0800  148.4100       9.7        89       801        91
VIS    2025250    200200   22.0800  148.4100       9.7        88       801        90
VIS    2025250    200200   22.0700  148.3600       8.7        86       808        92
VIS    2025250    200200   22.0700  148.3500       8.2        87       831        93
VIS    2025250    200200   22.0800  148.3100       7.4        89       853        95
VIS    2025250    200200   22.0800  148.3100       7.5        89       853        95
VIS    2025250    200200   22.0900  148.2700       8.1        91       920        98
VIS    2025250    200200   22.0900  148.2400       9.9        87       970        99
VIS    2025250    200200   22.0800  148.1700      10.1        85       984        91
VIS    2025250    200200   22.0700  148.1300       8.4        87       945        96
VIS    2025250    200200   22.0800  148.1200       8.2        86       945        94
VIS    2025250    200200   22.0800  148.1000       8.2        87       919        94
VIS    2025250    200200   22.0800  148.0600       8.5        95       877        97
VIS    2025250    200200   22.0700  148.0300       7.6        96       869        92
VIS    2025250    200200   22.0700  148.0300       7.6        95       867        93
VIS    2025250    200200   22.0700  147.9800       9.5        91       852        93
VIS    2025250    200200   22.0800  147.9800       9.6        91       852        93
VIS    2025250    200200   22.0700  147.9300       8.8        90       864        95
VIS    2025250    200200   22.0700  147.9300       8.6        89       866        95
VIS    2025250    200200   22.0800  147.9000       8.0        89       874        95
VIS    2025250    200200   22.0700  147.8700       7.2        87       877        92
VIS    2025250    200200   22.0700  147.8500       7.3        89       877        92
VIS    2025250    200200   22.0800  147.8200       8.8        93       870        93
VIS    2025250    200200   22.0600  147.8000       9.8        94       875        97
VIS    2025250    200200   22.0800  147.7600       9.4        95       877        98
VIS    2025250    200200   22.0600  147.7300       9.0        91       921        96
VIS    2025250    200200   22.0600  147.7000       8.8        88       935        95
VIS    2025250    200200   22.0600  147.7000       8.7        87       935        94
VIS    2025250    200200   22.0600  147.5800       9.4        89       874        95
VIS    2025250    200200   22.0700  147.5600       9.2        90       874        97
VIS    2025250    200200   22.0600  147.5400       9.1        89       878        98
VIS    2025250    200200   22.0600  147.5000       8.6        81       894        94
VIS    2025250    200200   22.0700  147.4700       7.8        78       894        91
VIS    2025250    200200   22.0700  147.4700       7.7        78       896        90
VIS    2025250    200200   22.0800  147.4400       7.8        82       902        91
VIS    2025250    200200   22.0800  147.4000       8.8        85       904        92
VIS    2025250    200200   22.0500  147.3700       8.1        83       894        95
VIS    2025250    200200   22.0700  147.3500       8.8        80       898        95
VIS    2025250    200200   22.0700  147.3400       9.0        80       907        96
VIS    2025250    200200   22.0700  147.3000       9.7        79       920        98
VIS    2025250    200200   22.0700  147.2900       9.6        78       920        97
VIS    2025250    200200   22.0500  147.0200      11.1        79       966        95
VIS    2025250    200200   22.0500  146.9900      11.5        82       961        98
VIS    2025250    200200   22.0700  146.9900      11.6        83       955        98
VIS    2025250    200200   22.0600  146.9500      10.0        82       932        94
VIS    2025250    200200   22.0700  146.9300       9.2        84       930        97
VIS    2025250    200200   22.0500  146.8900       9.0        86       919        96
VIS    2025250    200200   22.0500  146.8800       9.3        87       917        97
VIS    2025250    200200   22.0500  146.8500       9.5        85       916        99
VIS    2025250    200200   22.0500  146.8200       9.6        84       914        99
VIS    2025250    200200   22.0500  146.8100       9.7        85       914        99
VIS    2025250    200200   22.0600  146.7800       9.9        88       919        99
VIS    2025250    200200   22.0700  146.7600      10.5        92       919        98
VIS    2025250    200200   22.0600  146.7300      11.3        91       906        98
VIS    2025250    200200   22.0500  146.6900      10.5        88       901        98
VIS    2025250    200200   22.0500  146.6800      10.3        89       901        99
VIS    2025250    200200   22.0500  146.6400      11.0        92       903       100
VIS    2025250    200200   22.0700  146.6300      11.1        91       906       100
VIS    2025250    200200   22.0700  146.6000      11.0        93       913       100
VIS    2025250    200200   22.0600  146.5800      11.8        92       913        99
VIS    2025250    200200   22.0600  146.5600      12.7        89       913        98
VIS    2025250    200200   22.0600  146.5200      11.2        81       940        95
VIS    2025250    200200   22.0600  146.5100      11.1        80       940        94
VIS    2025250    200200   22.0600  146.4400      10.4        81       937        95
VIS    2025250    200200   22.0600  146.4300      10.5        78       937        94
VIS    2025250    200200   22.0400  146.2700      13.9        85       997        98
VIS    2025250    200200   22.0600  146.2300      13.6        84      1000        99
VIS    2025250    200200   22.0400  144.2600      12.3        90       910        98
VIS    2025250    200200   22.0400  144.2400      12.9        92       912        98
VIS    2025250    200200   22.0300  144.2300      12.6        92       911        98
VIS    2025250    200200   22.0400  144.1900      13.5        93       893        95
VIS    2025250    200200   22.0300  144.1800      13.3        93       886        94
VIS    2025250    200200   22.0400  144.1400      13.5        90       907        96
VIS    2025250    200200   22.0400  144.1300      13.4        92       909        97
VIS    2025250    200200   22.0200  144.0900      11.9        90       914       100
VIS    2025250    200200   22.0300  144.0700      12.0        90       917        99
VIS    2025250    200200   22.0400  144.0600      12.8        90       917        99
VIS    2025250    200200   22.0400  144.0200      13.3        91       922        97
VIS    2025250    200200   22.0400  144.0100      13.1        92       922        96
VIS    2025250    200200   22.0400  143.9700      13.5        90       924        98
VIS    2025250    200200   22.0200  143.9400      13.3        93       923        99
VIS    2025250    200200   22.0200  143.9200      13.4        94       923        99
VIS    2025250    200200   22.0300  143.9000      13.0        92       924        99
VIS    2025250    200200   22.0300  143.8800      12.1        91       924       100
VIS    2025250    200200   22.0300  143.8400      12.6        91       930        99
VIS    2025250    200200   22.0300  143.8200      12.8        91       932        97
VIS    2025250    200200   22.0300  143.7900      12.5        93       933        99
VIS    2025250    200200   22.0300  143.7900      12.2        93       933        99
VIS    2025250    200200   22.0200  143.7400      12.7        90       926        98
VIS    2025250    200200   22.0400  143.7200      12.4        90       925        99
VIS    2025250    200200   22.0300  143.7100      13.1        89       924        99
VIS    2025250    200200   22.0300  143.6700      13.3        88       927        99
VIS    2025250    200200   22.0200  143.6500      13.2        89       928        98
VIS    2025250    200200   22.0300  143.6300      12.6        91       937        96
VIS    2025250    200200   22.0400  143.6100      12.7        90       928        99
VIS    2025250    200200   22.0300  143.5800      13.2        87       923        98
VIS    2025250    200200   22.0200  143.5600      12.9        88       923        97
VIS    2025250    200200   22.0200  143.5200      10.9        86       926        99
VIS    2025250    200200   22.0200  143.5100      10.9        86       926        98
VIS    2025250    200200   22.0200  143.4900      11.6        84       926        99
VIS    2025250    200200   22.0400  143.4500      12.5        87       937       100
VIS    2025250    200200   22.0300  143.4200      11.8        89       937        99
VIS    2025250    200200   22.0300  143.4000      11.5        91       930        99
VIS    2025250    200200   22.0400  143.3700      12.3        92       929        98
VIS    2025250    200200   22.0300  143.3600      12.5        92       929        98
VIS    2025250    200200   22.0100  143.3200      13.2        93       941        97
VIS    2025250    200200   22.0300  143.2900      12.4        94       945        99
VIS    2025250    200200   22.0200  143.2800      12.2        93       947        98
VIS    2025250    200200   22.0200  143.2500      12.0        93       945        99
VIS    2025250    200200   22.0200  143.2300      12.2        92       944        99
VIS    2025250    200200   22.0100  143.2100      12.3        93       945        99
VIS    2025250    200200   22.0200  143.1700      12.3        93       934        99
VIS    2025250    200200   22.0100  143.1500      12.7        92       930        97
VIS    2025250    200200   22.0200  143.1400      13.0        92       929        96
VIS    2025250    200200   22.0100  143.1000      12.6        93       929        97
VIS    2025250    200200   22.0300  143.0700      11.9        89       933        97
VIS    2025250    200200   22.0300  143.0600      12.0        90       933        96
VIS    2025250    200200   22.0300  143.0200      11.9        92       959        99
VIS    2025250    200200   22.0300  143.0000      11.7        92       967        99
VIS    2025250    200200   22.0200  142.9700      12.2        95       967        95
VIS    2025250    200200   22.0300  142.9500      12.3        99       961        92
VIS    2025250    200200   22.0300  142.9400      12.6        98       958        93
VIS    2025250    200200   22.0200  142.9000      12.7        97       971        97
VIS    2025250    200200   22.0300  142.8900      12.7        92       984        98
VIS    2025250    200200   22.0100  142.8600      11.9        91       971        99
VIS    2025250    200200   22.0100  142.8400      11.7        90       978        99
VIS    2025250    200200   22.0100  142.7800       9.7       103       988        93
VIS    2025250    200200   22.0100  142.7400       7.6       102       980        91
VIS    2025250    200200   22.1100  151.6900       7.3        80       954        90
VIS    2025250    200200   22.0800  150.5700       9.0        93       936        90
VIS    2025250    200200   22.0900  150.5500       9.3        95       915        92
VIS    2025250    200200   22.0700  150.5200       9.3        91       872        95
VIS    2025250    200200   22.0900  150.5100       9.3        92       905        93
VIS    2025250    200200   22.0700  150.4600       8.7        91       905        95
VIS    2025250    200200   22.0700  150.4500       8.6        88       928        92
VIS    2025250    200200   22.0800  150.4100       8.3        83       954        91
VIS    2025250    200200   22.0800  150.4000       8.0        85       951        93
VIS    2025250    200200   22.0700  150.3300       8.6        88       964        91
VIS    2025250    200200   22.0700  150.3200       8.7        92       964        90
VIS    2025250    200200   22.0800  150.2800       9.1        92       895        95
VIS    2025250    200200   22.0800  150.2600       8.7        89       883        94
VIS    2025250    200200   22.0900  150.2500       8.2        87       888        92
VIS    2025250    200200   22.0600  149.7200      10.2       100       983        90
VIS    2025250    200200   22.0700  149.7100       9.7        98       983        92
VIS    2025250    200200   22.0800  149.6800       8.3        91       963        98
VIS    2025250    200200   22.0600  149.5000       9.6        99       982        91
VIS    2025250    200200   22.0600  149.4900       9.6        96       987        94
VIS    2025250    200200   22.0600  149.4500       9.9        97       974        94
VIS    2025250    200200   22.0600  149.4400       9.9        97       974        94
VIS    2025250    200200   22.0700  149.4000      10.3        98       905        94
VIS    2025250    200200   22.0600  149.3900      10.4        97       905        94
VIS    2025250    200200   22.0600  149.3600      10.3        96       931        94
VIS    2025250    200200   22.0700  149.3300      10.0        97       953        94
VIS    2025250    200200   22.0500  149.3000       9.6        97       892        96
VIS    2025250    200200   22.0500  149.2700       9.1        92       855        97
VIS    2025250    200200   22.0500  149.2400       9.1        91       879        98
VIS    2025250    200200   22.0600  149.2300       9.3        93       886        97
VIS    2025250    200200   22.0500  149.2000       8.8        93       901        98
VIS    2025250    200200   22.0600  149.1800       8.8        92       915        98
VIS    2025250    200200   22.0500  149.1600       8.7        90       934        98
VIS    2025250    200200   22.0600  149.1300       8.7        91       920        99
VIS    2025250    200200   22.0500  149.1100       8.9        89       893        98
VIS    2025250    200200   22.0700  149.0700       8.6        90       891        99
VIS    2025250    200200   22.0600  149.0500       8.5        92       899        99
VIS    2025250    200200   22.0500  149.0100       7.9        97       904        96
VIS    2025250    200200   22.0700  149.0100       8.3        96       904        93
VIS    2025250    200200   22.0500  148.9700       8.2        86       962        99
VIS    2025250    200200   22.0600  148.9500       8.4        87       949        98
VIS    2025250    200200   22.0500  148.9100       8.5        90       905        99
VIS    2025250    200200   22.0600  148.9000       8.7        88       905        99
VIS    2025250    200200   22.0600  148.8800       8.6        86       899        98
VIS    2025250    200200   22.0600  148.8300       8.9        85       893        97
VIS    2025250    200200   22.0600  148.8100       8.8        89       899        93
VIS    2025250    200200   22.0700  148.7900       8.3        89       900        91
VIS    2025250    200200   22.0500  148.7600       7.9        91       879        99
VIS    2025250    200200   22.0700  148.7400       8.5        88       868        95
VIS    2025250    200200   22.0500  148.7200       9.4        92       795        94
VIS    2025250    200200   22.0700  148.7000       9.5        82       795        90
VIS    2025250    200200   22.0700  148.6600       8.0        77       864        90
VIS    2025250    200200   22.0600  148.6300       8.1        83       893        96
VIS    2025250    200200   22.0400  148.6100       8.4        86       893        98
VIS    2025250    200200   22.0600  148.5800       9.4        84       856        91
VIS    2025250    200200   22.0500  148.5600       9.3        85       825        90
VIS    2025250    200200   22.0600  148.5200       9.9        86       798        90
VIS    2025250    200200   22.0600  148.4900       9.6        83       799        90
VIS    2025250    200200   22.0400  148.4700       9.3        87       854        91
VIS    2025250    200200   22.0500  148.4500       9.2        88       849        91
VIS    2025250    200200   22.0500  148.3700       8.8        83       808        91
VIS    2025250    200200   22.0600  148.3500       8.3        86       831        93
VIS    2025250    200200   22.0600  148.3500       8.1        86       849        93
VIS    2025250    200200   22.0600  148.3000       7.2        89       856        96
VIS    2025250    200200   22.0500  148.2300      10.6        88       977        98
VIS    2025250    200200   22.0600  148.2100      10.5        87       981        98
VIS    2025250    200200   22.0400  148.1900       9.6        85       977        97
VIS    2025250    200200   22.0400  148.1500       8.8        89       946        98
VIS    2025250    200200   22.0400  148.1400       8.9        90       946        98
VIS    2025250    200200   22.0500  148.1000       9.0        94       885        95
VIS    2025250    200200   22.0400  148.0800       9.2        97       885        98
VIS    2025250    200200   22.0500  148.0500       8.4        98       882        97
VIS    2025250    200200   22.0500  148.0300       7.7        95       869        93
VIS    2025250    200200   22.0500  147.9900       8.6        88       852        92
VIS    2025250    200200   22.0500  147.9700       9.2        88       852        91
VIS    2025250    200200   22.0400  147.9600       9.1        89       859        91
VIS    2025250    200200   22.0600  147.9400       9.2        89       859        91
VIS    2025250    200200   22.0400  147.9000       8.8        92       877        99
VIS    2025250    200200   22.0300  147.8700       8.1        88       880        97
VIS    2025250    200200   22.0300  147.8600       8.1        87       880        97
VIS    2025250    200200   22.0300  147.8200       8.4        89       880        99
VIS    2025250    200200   22.0300  147.8000       9.0        91       894       100
VIS    2025250    200200   22.0300  147.7600       9.3        92       909        98
VIS    2025250    200200   22.0400  147.7600       9.3        91       904        99
VIS    2025250    200200   22.0500  147.7400       9.2        91       906        98
VIS    2025250    200200   22.0500  147.7000       8.9        87       906        96
VIS    2025250    200200   22.0400  147.6700       8.8        79       880        92
VIS    2025250    200200   22.0300  147.6200       9.7        85       886        94
VIS    2025250    200200   22.0300  147.6100      10.6        89       886        95
VIS    2025250    200200   22.0400  147.5800      10.3        90       880        96
VIS    2025250    200200   22.0300  147.5400       8.6        85       894        98
VIS    2025250    200200   22.0500  147.5200       8.8        86       894        99
VIS    2025250    200200   22.0500  147.5100       8.6        84       894        97
VIS    2025250    200200   22.0300  147.4400       7.8        84       902        96
VIS    2025250    200200   22.0300  147.4100       8.4        86       904        98
VIS    2025250    200200   22.0300  147.4000       8.4        86       900        98
VIS    2025250    200200   22.0500  147.3600       8.0        81       893        94
VIS    2025250    200200   22.0400  147.3400       8.2        79       910        95
VIS    2025250    200200   22.0400  147.3100       8.2        78       920        95
VIS    2025250    200200   22.0400  147.3100       8.5        78       920        96
VIS    2025250    200200   22.0500  147.2800       9.0        75       927        95
VIS    2025250    200200   22.0400  147.2500       8.9        76       961        96
VIS    2025250    200200   22.0500  147.0400      11.5        80       983        94
VIS    2025250    200200   22.0300  147.0000      11.9        81       966        99
VIS    2025250    200200   22.0300  146.9900      12.0        81       955        99
VIS    2025250    200200   22.0200  146.9700      11.8        83       946        98
VIS    2025250    200200   22.0300  146.9300      10.3        84       925        98
VIS    2025250    200200   22.0300  146.9200       9.7        85       922        97
VIS    2025250    200200   22.0300  146.8900       9.5        85       917        98
VIS    2025250    200200   22.0200  146.8500      10.1        84       914        99
VIS    2025250    200200   22.0200  146.8200      10.3        86       914        99
VIS    2025250    200200   22.0300  146.8100      10.3        86       914        99
VIS    2025250    200200   22.0200  146.7700      10.7        89       908        99
VIS    2025250    200200   22.0200  146.7600      10.8        89       906       100
VIS    2025250    200200   22.0200  146.7200      10.6        84       903        98
VIS    2025250    200200   22.0300  146.6900      10.1        86       901        98
VIS    2025250    200200   22.0200  146.6900       9.9        87       901        98
VIS    2025250    200200   22.0400  146.6400      10.9        91       903       100
VIS    2025250    200200   22.0300  146.6200      11.3        98       898        99
VIS    2025250    200200   22.0400  146.6100      11.1        95       902        99
VIS    2025250    200200   22.0400  146.5800      11.8        93       901        98
VIS    2025250    200200   22.0300  146.5600      13.0        88       901        96
VIS    2025250    200200   22.0200  146.5400      12.0        80       908        97
VIS    2025250    200200   22.0200  146.4900       9.8        83       944        95
VIS    2025250    200200   22.0200  146.4400      10.0       102       967        91
VIS    2025250    200200   22.0200  146.3200      13.8        87       982        99
VIS    2025250    200200   22.0200  146.2600      13.0        87       984        98
VIS    2025250    200200   22.0200  146.2500      12.9        87       972        98
VIS    2025250    200200   22.0200  146.2100      13.8        85       985       100
VIS    2025250    200200   22.0200  145.9500      13.4        90       984        94
VIS    2025250    200200   22.0300  145.2000      13.4        97       813        90
VIS    2025250    200200   22.0300  145.1900      12.8        98       813        90
VIS    2025250    200200   22.0100  144.2800      11.0        90       863        93
VIS    2025250    200200   22.0100  144.2500      11.9        90       877        93
VIS    2025250    200200   22.0100  144.2400      12.0        89       877        92
VIS    2025250    200200   22.0000  144.2000      11.6        91       862        92
VIS    2025250    200200   22.0000  144.1700      12.6        92       884        95
VIS    2025250    200200   22.0100  144.1700      12.8        92       884        95
VIS    2025250    200200   22.0000  144.1200      12.1        90       889        96
VIS    2025250    200200   22.0200  144.1000      11.9        90       914       100
VIS    2025250    200200   22.0200  144.0900      11.8        90       914       100
VIS    2025250    200200   22.0100  144.0600      11.8        90       913        98
VIS    2025250    200200   22.0000  144.0400      12.4        89       916        99
VIS    2025250    200200   21.9900  144.0000      12.8        91       924       100
VIS    2025250    200200   21.9900  143.9900      12.5        92       924        99
VIS    2025250    200200   22.0000  143.9500      12.8        95       923        99
VIS    2025250    200200   22.0000  143.9300      13.7        96       923        98
VIS    2025250    200200   22.0000  143.9100      13.9        95       923        98
VIS    2025250    200200   22.0100  143.8800      12.6        93       928       100
VIS    2025250    200200   22.0100  143.8500      12.7        93       930        99
VIS    2025250    200200   22.0000  143.8300      14.1        95       930        97
VIS    2025250    200200   22.0100  143.8000      13.7        93       930        98
VIS    2025250    200200   21.9900  143.7900      14.2        94       925        97
VIS    2025250    200200   22.0000  143.7500      13.4        91       925        98
VIS    2025250    200200   22.0100  143.7300      12.8        89       925        98
VIS    2025250    200200   22.0000  143.7000      13.7        88       921        97
VIS    2025250    200200   22.0100  143.6700      13.9        87       925        98
VIS    2025250    200200   22.0100  143.6500      13.5        89       928        97
VIS    2025250    200200   21.9900  143.6400      13.9        89       925        96
VIS    2025250    200200   22.0000  143.6000      13.0        90       923        97
VIS    2025250    200200   22.0000  143.5900      12.8        90       919        97
VIS    2025250    200200   22.0100  143.5600      12.7        88       923        97
VIS    2025250    200200   22.0100  143.5300      11.6        88       925        98
VIS    2025250    200200   22.0000  143.5200      11.8        89       924        98
VIS    2025250    200200   22.0100  143.5000      11.5        87       925        99
VIS    2025250    200200   21.9900  143.4500      11.8        91       925       100
VIS    2025250    200200   22.0000  143.4300      12.0        91       926        99
VIS    2025250    200200   22.0100  143.4000      11.7        91       926        99
VIS    2025250    200200   22.0000  143.4000      11.7        92       926        99
VIS    2025250    200200   22.0000  143.3600      12.0        94       929        97
VIS    2025250    200200   22.0100  143.3500      12.6        92       930        96
VIS    2025250    200200   22.0100  143.3000      12.6        94       956        97
VIS    2025250    200200   22.0100  143.2800      11.5        95       956        95
VIS    2025250    200200   22.0100  143.2300      12.4        94       944        96
VIS    2025250    200200   22.0100  143.2000      12.4        93       947        98
VIS    2025250    200200   22.0100  143.2000      12.4        93       947        99
VIS    2025250    200200   22.0000  143.1700      12.1        93       950        99
VIS    2025250    200200   22.0000  143.1500      12.4        93       930        97
VIS    2025250    200200   21.9900  143.1200      12.7        94       930        96
VIS    2025250    200200   21.9900  143.0900      12.5        95       933        97
VIS    2025250    200200   21.9900  143.0700      12.2        96       947        97
VIS    2025250    200200   21.9900  143.0400      11.4        93       950        98
VIS    2025250    200200   21.9900  143.0200      10.8        93       959        98
VIS    2025250    200200   22.0000  142.9900      11.6        92       969        98
VIS    2025250    200200   21.9900  142.9100      12.3        99       975        97
VIS    2025250    200200   21.9900  142.8900      11.4        95       971        98
VIS    2025250    200200   21.9900  142.8700      11.4        95       969        98
VIS    2025250    200200   21.9900  142.8500      11.5        93       962        98
VIS    2025250    200200   21.9900  142.8100       9.8        99       971        92
VIS    2025250    200200   21.9800  142.6000       8.0       107       988        92
VIS    2025250    200200   22.0700  150.5800       8.6        90       961        90
VIS    2025250    200200   22.0600  150.5600       8.9        89       927        91
VIS    2025250    200200   22.0700  150.5300       9.3        90       869        95
VIS    2025250    200200   22.0500  150.5000       9.0        91       869        95
VIS    2025250    200200   22.0500  150.4800       8.9        92       875        95
VIS    2025250    200200   22.0500  150.4700       9.0        91       883        95
VIS    2025250    200200   22.0700  150.4500       8.8        88       928        91
VIS    2025250    200200   22.0400  150.3700       8.6        92       970        91
VIS    2025250    200200   22.0600  150.3500       8.5        87       979        92
VIS    2025250    200200   22.0600  150.3300       8.6        87       964        91
VIS    2025250    200200   22.0600  150.3100       9.0        92       958        90
VIS    2025250    200200   22.0600  150.2600       9.1        90       900        92
VIS    2025250    200200   22.0500  150.2200       8.7        86       922        95
VIS    2025250    200200   22.0300  149.7000      10.3       100       938        91
VIS    2025250    200200   22.0500  149.6300       9.9       100       914        94
VIS    2025250    200200   22.0500  149.6300       9.9       101       914        94
VIS    2025250    200200   22.0300  149.4900       9.6       104       966        92
VIS    2025250    200200   22.0300  149.4500       9.4        93       981        96
VIS    2025250    200200   22.0500  149.4300       9.9        95       938        95
VIS    2025250    200200   22.0500  149.4200       9.9        95       929        95
VIS    2025250    200200   22.0300  149.3800      10.4        96       904        94
VIS    2025250    200200   22.0300  149.3700      10.3        96       904        94
VIS    2025250    200200   22.0500  149.3300       9.9        98       931        95
VIS    2025250    200200   22.0400  149.3000       9.3        96       892        97
VIS    2025250    200200   22.0500  149.3000       9.3        96       892        97
VIS    2025250    200200   22.0300  149.2600       9.1        90       844        97
VIS    2025250    200200   22.0500  149.2200       9.0        90       886        98
VIS    2025250    200200   22.0300  149.2000       8.4        90       886        99
VIS    2025250    200200   22.0500  149.1900       8.6        91       901        99
VIS    2025250    200200   22.0400  149.1600       8.4        86       905        99
VIS    2025250    200200   22.0500  149.1000       8.8        88       893        97
VIS    2025250    200200   22.0400  149.0900       9.0        86       896        96
VIS    2025250    200200   22.0500  149.0600       9.0        86       899        98
VIS    2025250    200200   22.0300  149.0200       8.0        92       899        99
VIS    2025250    200200   22.0300  149.0100       7.8        95       904        96
VIS    2025250    200200   22.0400  148.9700       8.1        87       962        98
VIS    2025250    200200   22.0200  148.9400       8.2        87       903        99
VIS    2025250    200200   22.0400  148.9300       8.3        89       905        99
VIS    2025250    200200   22.0200  148.9100       8.5        90       896        98
VIS    2025250    200200   22.0200  148.8800       8.5        89       892        98
VIS    2025250    200200   22.0200  148.8500       8.2        86       893        97
VIS    2025250    200200   22.0400  148.8200       8.7        87       899        97
VIS    2025250    200200   22.0400  148.7900       8.2        90       903        94
VIS    2025250    200200   22.0400  148.7900       8.0        89       899        96
VIS    2025250    200200   22.0300  148.7400       8.2        92       796        95
VIS    2025250    200200   22.0300  148.7200       9.2        93       794        94
VIS    2025250    200200   22.0300  148.7000       9.1        86       796        92
VIS    2025250    200200   22.0400  148.6700       8.5        80       799        90
VIS    2025250    200200   22.0300  148.6500       7.9        84       864        94
VIS    2025250    200200   22.0200  148.6300       7.9        87       893        99
VIS    2025250    200200   22.0400  148.6100       8.4        86       893        99
VIS    2025250    200200   22.0400  148.5600       8.9        84       857        92
VIS    2025250    200200   22.0400  148.5600       8.9        84       856        91
VIS    2025250    200200   22.0200  148.5100       9.6        90       831        92
VIS    2025250    200200   22.0300  148.4800       9.7        90       853        92
VIS    2025250    200200   22.0400  148.4700       9.4        88       854        92
VIS    2025250    200200   22.0400  148.4500       9.4        89       854        91
VIS    2025250    200200   22.0300  148.4100       9.4        86       831        90
VIS    2025250    200200   22.0300  148.3800       9.0        84       835        91
VIS    2025250    200200   22.0400  148.3700       8.7        84       835        91
VIS    2025250    200200   22.0300  148.3300       8.1        88       855        95
VIS    2025250    200200   22.0300  148.3200       7.8        87       857        95
VIS    2025250    200200   22.0200  148.2700       9.4        84       911        90
VIS    2025250    200200   22.0300  148.2400      10.2        85       977        95
VIS    2025250    200200   22.0300  148.2300      10.3        87       978        97
VIS    2025250    200200   22.0300  148.1900       9.1        86       975        97
VIS    2025250    200200   22.0300  148.1500       8.9        89       975        97
VIS    2025250    200200   22.0300  148.1300       9.0        91       946        97
VIS    2025250    200200   22.0200  148.1100       9.2        94       927        93
VIS    2025250    200200   22.0200  148.1000       9.0        94       909        94
VIS    2025250    200200   22.0300  148.0000       8.2        88       854        92
VIS    2025250    200200   22.0200  147.9900       8.2        88       856        92
VIS    2025250    200200   22.0300  147.9700       8.8        88       857        92
VIS    2025250    200200   22.0100  147.9300       9.4        91       874        97
VIS    2025250    200200   22.0100  147.9000       9.5        92       875        98
VIS    2025250    200200   22.0200  147.8800       8.8        89       880        98
VIS    2025250    200200   22.0300  147.8700       8.5        89       880        98
VIS    2025250    200200   22.0200  147.8200       8.5        87       885        99
VIS    2025250    200200   22.0200  147.8200       8.5        88       894       100
VIS    2025250    200200   22.0200  147.7700       9.3        93       909        98
VIS    2025250    200200   22.0300  147.7700       9.3        92       909        98
VIS    2025250    200200   22.0100  147.7400       9.2        91       875        90
VIS    2025250    200200   22.0300  147.7200       9.1        88       882        93
VIS    2025250    200200   22.0100  147.6800       9.9        82       880        95
VIS    2025250    200200   22.0100  147.6600       9.9        81       882        95
VIS    2025250    200200   22.0100  147.6400       9.6        81       886        94
VIS    2025250    200200   22.0300  147.6100      10.5        88       888        97
VIS    2025250    200200   22.0100  147.5800       9.2        85       894        96
VIS    2025250    200200   22.0100  147.5600       8.5        84       896        95
VIS    2025250    200200   22.0200  147.5400       8.5        84       896        97
VIS    2025250    200200   22.0200  147.5200       8.5        83       896        93
VIS    2025250    200200   22.0000  147.4400       7.6        88       892        98
VIS    2025250    200200   22.0100  147.4300       7.7        84       892        97
VIS    2025250    200200   22.0000  147.4000       8.1        82       892        96
VIS    2025250    200200   22.0000  147.3700       8.3        81       896        93
VIS    2025250    200200   22.0100  147.3500       8.2        80       899        94
VIS    2025250    200200   22.0200  147.3200       8.1        80       910        93
VIS    2025250    200200   22.0100  147.3100       7.2        78       920        90
VIS    2025250    200200   22.0200  147.2400       8.2        78       961        94
VIS    2025250    200200   22.0100  146.9800      12.1        83       953       100
VIS    2025250    200200   22.0100  146.9700      11.9        84       946       100
VIS    2025250    200200   22.0100  146.9400      11.1        85       928        97
VIS    2025250    200200   22.0100  146.9100      10.4        83       919        98
VIS    2025250    200200   22.0200  146.8900      10.0        83       916        98
VIS    2025250    200200   22.0000  146.8500      10.3        82       916        99
VIS    2025250    200200   22.0000  146.8400      10.4        83       914        99
VIS    2025250    200200   22.0100  146.8200      10.3        85       912        98
VIS    2025250    200200   22.0100  146.8000      10.6        87       911        98
VIS    2025250    200200   22.0100  146.7600      11.0        89       906       100
VIS    2025250    200200   22.0000  146.7300      10.5        87       903        98
VIS    2025250    200200   22.0100  146.7000      10.0        86       903        99
VIS    2025250    200200   22.0100  146.7000       9.8        87       903        98
VIS    2025250    200200   22.0200  146.6700      10.2        89       898        99
VIS    2025250    200200   22.0100  146.6300      11.9        96       826        91
VIS    2025250    200200   22.0000  146.6100      12.1        97       782        90
VIS    2025250    200200   22.0100  146.5700      12.0        91       864        90
VIS    2025250    200200   22.0100  146.5500      11.5        81       898        96
VIS    2025250    200200   22.0000  146.5200       9.3        72       886        91
VIS    2025250    200200   22.0100  146.4800       9.4        86       947        94
VIS    2025250    200200   21.9900  146.4500       8.5        91       959        90
VIS    2025250    200200   22.0000  146.4400       8.5        94       967        90
VIS    2025250    200200   22.0000  146.3900      11.8        87       970        99
VIS    2025250    200200   21.9900  146.3500      14.2        88       995        98
VIS    2025250    200200   21.9900  146.3400      14.1        87       995        98
VIS    2025250    200200   21.9900  146.3100      13.7        88       982        98
VIS    2025250    200200   21.9900  146.2900      13.7        85       982        99
VIS    2025250    200200   21.9900  146.2600      13.0        86       970        99
VIS    2025250    200200   21.9900  146.2300      13.0        89       972        99
VIS    2025250    200200   22.0100  146.2000      14.0        87       985        99
VIS    2025250    200200   22.0100  146.1900      13.9        86       980        99
VIS    2025250    200200   21.9900  146.0300      13.3        85       989        99
VIS    2025250    200200   21.9900  146.0200      13.2        85       989        99
VIS    2025250    200200   21.9900  145.9600      10.7        84       982        91
VIS    2025250    200200   21.9900  145.9300      12.5        86       938        99
VIS    2025250    200200   21.9900  145.9200      12.5        86       938        99
VIS    2025250    200200   21.9900  144.2600      10.8        95       839        93
VIS    2025250    200200   21.9900  144.2300      10.3        91       839        90
VIS    2025250    200200   21.9900  144.1900      11.9        92       862        93
VIS    2025250    200200   21.9900  144.1300      12.1        90       888        95
VIS    2025250    200200   21.9700  144.1200      12.0        90       879        93
VIS    2025250    200200   21.9700  144.0800      11.9        92       889        95
VIS    2025250    200200   21.9700  144.0600      12.2        90       902        97
VIS    2025250    200200   21.9800  144.0400      12.7        89       913        99
VIS    2025250    200200   21.9900  144.0000      12.7        91       924       100
VIS    2025250    200200   21.9900  144.0000      12.6        91       924       100
VIS    2025250    200200   21.9700  143.9700      12.5        90       930        98
VIS    2025250    200200   21.9700  143.9400      13.5        94       930        98
VIS    2025250    200200   21.9700  143.9200      13.9        93       936        98
VIS    2025250    200200   21.9800  143.8900      14.5        94       930        97
VIS    2025250    200200   21.9700  143.8600      13.5        94       933        98
VIS    2025250    200200   21.9700  143.8400      14.3        95       928        97
VIS    2025250    200200   21.9700  143.8000      14.2        94       923        97
VIS    2025250    200200   21.9700  143.8000      14.1        94       923        97
VIS    2025250    200200   21.9700  143.7500      13.6        91       921        98
VIS    2025250    200200   21.9900  143.7300      13.4        89       920        98
VIS    2025250    200200   21.9700  143.7100      13.5        89       913        96
VIS    2025250    200200   21.9900  143.6900      14.1        88       920        96
VIS    2025250    200200   21.9900  143.6600      14.3        90       921        95
VIS    2025250    200200   21.9700  143.6400      14.2        88       920        95
VIS    2025250    200200   21.9700  143.6000      13.1        88       916        95
VIS    2025250    200200   21.9700  143.6000      12.8        89       917        95
VIS    2025250    200200   21.9800  143.5700      12.1        89       918        93
VIS    2025250    200200   21.9700  143.5300      12.5        90       921        96
VIS    2025250    200200   21.9600  143.5100      12.7        91       922        99
VIS    2025250    200200   21.9700  143.4800      11.7        93       925       100
VIS    2025250    200200   21.9800  143.4600      11.7        93       925       100
VIS    2025250    200200   21.9700  143.4300      12.1        95       926        97
VIS    2025250    200200   21.9700  143.4200      12.1        94       926        96
VIS    2025250    200200   21.9600  143.3900      11.7        97       926        97
VIS    2025250    200200   21.9700  143.3500      11.9        94       943        95
VIS    2025250    200200   21.9600  143.3400      12.3        91       960        96
VIS    2025250    200200   21.9800  143.3200      13.4        91       965        96
VIS    2025250    200200   21.9700  143.3000      11.8        91       993        99
VIS    2025250    200200   21.9700  143.2600      10.4       101       992        91
VIS    2025250    200200   21.9600  143.1800      12.3        94       979        98
VIS    2025250    200200   21.9800  143.1700      11.9        93       955        98
VIS    2025250    200200   21.9800  143.1400      12.3        93       944        98
VIS    2025250    200200   21.9800  143.1200      12.6        95       934        97
VIS    2025250    200200   21.9800  143.1000      12.5        96       947        98
VIS    2025250    200200   21.9800  143.0800      11.7        99       947        96
VIS    2025250    200200   21.9600  143.0300      11.0        94       944        98
VIS    2025250    200200   21.9700  143.0100      10.4        96       950        96
VIS    2025250    200200   21.9600  142.9900      10.2       103       970        91
VIS    2025250    200200   21.9800  142.9600      12.1       102       985        94
VIS    2025250    200200   21.9600  142.9400      12.2        97       993        97
VIS    2025250    200200   21.9600  142.9100      11.8        92       983        99
VIS    2025250    200200   21.9800  142.8800      10.9        95       971        98
VIS    2025250    200200   21.9800  142.8800      10.9        96       971        97
VIS    2025250    200200   21.9800  142.8500      11.2        95       962        97
VIS    2025250    200200   21.9700  142.7100       9.1       114       965        90
VIS    2025250    200200   21.9600  142.6800       9.3       105       964        90
VIS    2025250    200200   21.9600  142.6800       9.4       106       964        90
VIS    2025250    200200   21.9700  142.6000       8.1       105       983        93
VIS    2025250    200200   22.0400  150.5700       9.1        88       933        90
VIS    2025250    200200   22.0300  150.5500       9.1        88       924        91
VIS    2025250    200200   22.0400  150.5200       9.2        91       863        96
VIS    2025250    200200   22.0300  150.5000       9.2        93       869        96
VIS    2025250    200200   22.0400  150.4800       9.1        93       875        95
VIS    2025250    200200   22.0300  150.4400       9.3        92       921        90
VIS    2025250    200200   22.0300  150.3600       9.0        91       968        90
VIS    2025250    200200   22.0300  150.3200       8.7        86       964        90
VIS    2025250    200200   22.0300  149.6500      10.5       100       914        92
VIS    2025250    200200   22.0300  149.6500      10.6       101       914        92
VIS    2025250    200200   22.0100  149.5000       9.8       107       945        90
VIS    2025250    200200   22.0200  149.4800       9.3       101       966        94
VIS    2025250    200200   22.0100  149.4700       9.0        98       966        95
VIS    2025250    200200   22.0100  149.4200       9.7        86       929        96
VIS    2025250    200200   22.0000  149.4100       9.6        85       928        96
VIS    2025250    200200   22.0000  149.3800       9.8        93       904        96
VIS    2025250    200200   22.0000  149.3400       9.7        95       905        96
VIS    2025250    200200   22.0100  149.3200       9.2        94       907        98
VIS    2025250    200200   22.0000  149.2900       9.0        91       857        98
VIS    2025250    200200   22.0100  149.2700       8.9        90       853        97
VIS    2025250    200200   22.0100  149.2500       8.7        88       853        97
VIS    2025250    200200   22.0100  149.2200       8.3        87       879        98
VIS    2025250    200200   22.0200  149.2100       8.4        88       880        98
VIS    2025250    200200   22.0200  149.1800       8.1        86       891        98
VIS    2025250    200200   22.0000  149.0900       8.3        91       957        96
VIS    2025250    200200   22.0100  149.0600       9.0        86       916        98
VIS    2025250    200200   22.0200  149.0500       9.0        83       914        99
VIS    2025250    200200   22.0100  149.0300       8.4        85       892        98
VIS    2025250    200200   22.0000  148.9900       7.4        92       893        99
VIS    2025250    200200   22.0100  148.9600       7.7        88       909       100
VIS    2025250    200200   22.0100  148.9400       8.1        88       900        99
VIS    2025250    200200   22.0200  148.9100       8.5        90       892        98
VIS    2025250    200200   22.0100  148.8800       8.4        89       883        97
VIS    2025250    200200   22.0000  148.8800       8.3        89       883        98
VIS    2025250    200200   22.0100  148.8400       8.0        87       893        97
VIS    2025250    200200   22.0000  148.8300       7.9        89       893        99
VIS    2025250    200200   22.0100  148.7900       8.1        89       887        99
VIS    2025250    200200   22.0200  148.7800       7.8        89       883        99
VIS    2025250    200200   22.0000  148.7500       8.3        88       875        98
VIS    2025250    200200   22.0100  148.7300       8.9        89       794        93
VIS    2025250    200200   22.0100  148.6800       8.5        83       796        91
VIS    2025250    200200   22.0000  148.6700       7.9        83       799        92
VIS    2025250    200200   21.9900  148.6500       7.6        83       840        93
VIS    2025250    200200   22.0100  148.6300       7.7        88       893        99
VIS    2025250    200200   22.0000  148.5800       7.7        88       897        99
VIS    2025250    200200   22.0100  148.5700       8.0        85       875        96
VIS    2025250    200200   21.9900  148.5400       9.2        86       831        92
VIS    2025250    200200   21.9900  148.5200       9.7        89       831        92
VIS    2025250    200200   22.0000  148.4900       9.9        92       854        91
VIS    2025250    200200   22.0100  148.4700       9.7        91       853        91
VIS    2025250    200200   22.0100  148.4300       9.5        88       817        91
VIS    2025250    200200   21.9900  148.4100       9.5        87       831        91
VIS    2025250    200200   22.0000  148.3700       9.2        87       854        92
VIS    2025250    200200   22.0000  148.3500       8.7        87       855        93
VIS    2025250    200200   22.0100  148.3300       8.4        88       858        95
VIS    2025250    200200   21.9900  148.2200       8.7        91       979        92
VIS    2025250    200200   22.0000  148.2100       8.7        89       975        94
VIS    2025250    200200   22.0000  148.1800       8.8        89       966        94
VIS    2025250    200200   22.0100  148.1600       9.0        90       963        96
VIS    2025250    200200   21.9900  148.1200       8.5        92       928        95
VIS    2025250    200200   22.0100  148.1100       8.8        92       928        93
VIS    2025250    200200   22.0000  148.0300       8.7        91       857        91
VIS    2025250    200200   22.0000  147.9900       8.4        92       856        95
VIS    2025250    200200   22.0100  147.9700       8.5        91       862        96
VIS    2025250    200200   21.9900  147.9500       9.0        90       872        98
VIS    2025250    200200   21.9900  147.9300       9.3        88       872        97
VIS    2025250    200200   21.9900  147.9100       9.7        86       875        95
VIS    2025250    200200   21.9800  147.8800      10.0        83       879        92
VIS    2025250    200200   21.9900  147.8500       9.5        85       879        95
VIS    2025250    200200   21.9900  147.8300       9.2        85       879        97
VIS    2025250    200200   22.0000  147.7900       9.2        90       894        97
VIS    2025250    200200   22.0000  147.7900       9.3        90       894        96
VIS    2025250    200200   22.0000  147.6900       9.7        88       878        97
VIS    2025250    200200   21.9900  147.6600       9.5        82       890        97
VIS    2025250    200200   21.9900  147.6600       9.7        81       888        96
VIS    2025250    200200   21.9800  147.6100       9.1        81       892        97
VIS    2025250    200200   21.9800  147.5900       8.9        83       892        95
VIS    2025250    200200   22.0000  147.5800       9.3        84       894        95
VIS    2025250    200200   21.9900  147.5600       8.3        85       896        96
VIS    2025250    200200   21.9800  147.5200       8.0        92       892        99
VIS    2025250    200200   21.9800  147.4900       8.3       100       860        99
VIS    2025250    200200   21.9900  147.4600       7.7        95       860        98
VIS    2025250    200200   22.0000  147.4500       7.6        89       892        98
VIS    2025250    200200   21.9900  147.4100       7.8        83       892        94
VIS    2025250    200200   21.9800  147.4000       8.2        83       890        95
VIS    2025250    200200   21.9900  147.3800       8.1        81       892        92
VIS    2025250    200200   22.0000  147.3500       8.1        79       898        93
VIS    2025250    200200   21.9900  147.3300       7.4        78       902        91
VIS    2025250    200200   21.9900  147.2900       6.5        76       920        90
VIS    2025250    200200   21.9700  147.0000      11.2        86       995        95
VIS    2025250    200200   21.9700  146.9800      11.4        86       982        99
VIS    2025250    200200   21.9800  146.9700      11.4        86       965        99
VIS    2025250    200200   21.9800  146.9400      11.2        85       933        98
VIS    2025250    200200   21.9700  146.9200      10.4        82       928        98
VIS    2025250    200200   21.9700  146.8900      10.1        80       917        98
VIS    2025250    200200   21.9800  146.8600      10.5        81       917        99
VIS    2025250    200200   21.9900  146.8400      10.4        83       914        99
VIS    2025250    200200   21.9700  146.8200      10.7        85       912        98
VIS    2025250    200200   21.9700  146.7800      10.3        88       906        98
VIS    2025250    200200   21.9700  146.7500      10.5        88       908        98
VIS    2025250    200200   21.9800  146.7400      10.2        88       908        98
VIS    2025250    200200   21.9700  146.7100      10.3        87       908        98
VIS    2025250    200200   21.9900  146.6800       9.8        92       898        99
VIS    2025250    200200   21.9900  146.6700      10.3        92       886        99
VIS    2025250    200200   21.9700  146.5200       9.4        79       891        94
VIS    2025250    200200   21.9700  146.5200       9.2        78       891        94
VIS    2025250    200200   21.9900  146.4900       9.3        77       908        94
VIS    2025250    200200   21.9800  146.4500       8.2        87       956        92
VIS    2025250    200200   21.9700  146.4300      10.1        78       959        97
VIS    2025250    200200   21.9800  146.4000      12.0        81       967       100
VIS    2025250    200200   21.9800  146.3800      13.9        84       974        99
VIS    2025250    200200   21.9900  146.3500      14.4        87       976        98
VIS    2025250    200200   21.9900  146.3200      13.7        86       982        98
VIS    2025250    200200   21.9700  146.3100      13.6        86       967        98
VIS    2025250    200200   21.9800  146.2900      13.6        85       966        99
VIS    2025250    200200   21.9800  146.2600      12.9        86       965        99
VIS    2025250    200200   21.9900  146.2400      12.8        88       970        99
VIS    2025250    200200   21.9600  146.2000      13.5        87       975       100
VIS    2025250    200200   21.9700  146.0800      14.2        88       996        95
VIS    2025250    200200   21.9800  146.0400      13.4        85       996        99
VIS    2025250    200200   21.9800  146.0300      13.0        85       989        99
VIS    2025250    200200   21.9600  144.0700      12.1        91       889        95
VIS    2025250    200200   21.9600  144.0400      13.0        89       907        97
VIS    2025250    200200   21.9500  144.0300      13.1        88       917        98
VIS    2025250    200200   21.9600  144.0000      12.7        89       924        99
VIS    2025250    200200   21.9600  143.9800      12.5        90       930        99
VIS    2025250    200200   21.9600  143.9400      13.4        92       934        98
VIS    2025250    200200   21.9600  143.9100      13.8        92       938        98
VIS    2025250    200200   21.9500  143.9000      13.7        90       941        99
VIS    2025250    200200   21.9400  143.8700      13.4        90       934        99
VIS    2025250    200200   21.9500  143.8500      13.7        92       933        98
VIS    2025250    200200   21.9600  143.8100      14.1        95       923        97
VIS    2025250    200200   21.9600  143.8100      13.9        94       923        97
VIS    2025250    200200   21.9400  143.7800      12.6        95       913        98
VIS    2025250    200200   21.9400  143.7500      12.9        92       910        97
VIS    2025250    200200   21.9600  143.7100      13.6        91       913        96
VIS    2025250    200200   21.9600  143.7000      13.7        91       913        96
VIS    2025250    200200   21.9500  143.6600      13.8        92       916        97
VIS    2025250    200200   21.9400  143.6400      13.6        89       916        95
VIS    2025250    200200   21.9400  143.6300      13.6        89       916        95
VIS    2025250    200200   21.9600  143.6000      13.1        88       915        94
VIS    2025250    200200   21.9600  143.5600      12.0        91       916        95
VIS    2025250    200200   21.9600  143.5600      11.9        90       918        95
VIS    2025250    200200   21.9600  143.5300      12.4        91       919        95
VIS    2025250    200200   21.9500  143.4900      12.3        94       922        99
VIS    2025250    200200   21.9500  143.4800      11.7        94       924        99
VIS    2025250    200200   21.9400  143.4400      11.9        91       926        98
VIS    2025250    200200   21.9400  143.4200      12.5        92       926        92
VIS    2025250    200200   21.9500  143.3700      11.8        92       930        99
VIS    2025250    200200   21.9600  143.3400      12.1        90       949        96
VIS    2025250    200200   21.9600  143.3300      12.7        89       960        97
VIS    2025250    200200   21.9400  143.2900      10.7        94       972        97
VIS    2025250    200200   21.9500  143.2800      10.3        98       993        95
VIS    2025250    200200   21.9400  143.2000      11.9        98       968        97
VIS    2025250    200200   21.9400  143.1700      12.6        92       958        99
VIS    2025250    200200   21.9600  143.1400      12.3        93       948        96
VIS    2025250    200200   21.9500  143.1300      12.3        93       948        96
VIS    2025250    200200   21.9600  143.1100      11.8        96       950        97
VIS    2025250    200200   21.9400  143.0600      10.9        90       934        99
VIS    2025250    200200   21.9400  143.0600      11.1        90       934        99
VIS    2025250    200200   21.9600  143.0300      10.9        94       944        98
VIS    2025250    200200   21.9600  142.9900       9.8       103       964        90
VIS    2025250    200200   21.9500  142.9700      10.4       105       964        93
VIS    2025250    200200   21.9600  142.9400      11.5        97       993        97
VIS    2025250    200200   21.9600  142.9200      11.5        93       998        99
VIS    2025250    200200   21.9500  142.8900      10.6        96       974        94
VIS    2025250    200200   21.9600  142.8600       9.7        99       968        92
VIS    2025250    200200   21.9500  142.7000       8.6       116       957        90
VIS    2025250    200200   21.9300  142.6800      10.1       105       960        92
VIS    2025250    200200   21.9500  142.6600       9.4       109       966        90
VIS    2025250    200200   21.9300  142.6400      10.5        92       974        96
VIS    2025250    200200   22.0200  150.5500       9.0        88       933        91
VIS    2025250    200200   22.0100  150.5200       9.3        92       899        94
VIS    2025250    200200   22.0100  150.5000       9.5        94       878        95
VIS    2025250    200200   22.0100  150.4900       9.4        95       889        93
VIS    2025250    200200   22.0200  150.4500       9.2        93       893        93
VIS    2025250    200200   22.0000  150.4400       8.9        93       918        93
VIS    2025250    200200   21.9900  150.4000       9.0        92       943        90
VIS    2025250    200200   21.9800  149.6200      11.4        98       979        90
VIS    2025250    200200   22.0000  149.5000       9.4       101       966        94
VIS    2025250    200200   21.9900  149.4600       9.0        96       945        97
VIS    2025250    200200   21.9800  149.4400       9.2        91       943        97
VIS    2025250    200200   22.0000  149.4200       9.5        85       939        97
VIS    2025250    200200   21.9900  149.3900       9.4        90       897        97
VIS    2025250    200200   21.9900  149.3800       9.5        92       897        97
VIS    2025250    200200   22.0000  149.3500       9.7        95       904        96
VIS    2025250    200200   21.9800  149.3200       9.2        93       899        98
VIS    2025250    200200   21.9900  149.2900       8.9        89       853        97
VIS    2025250    200200   21.9900  149.2700       8.8        87       853        97
VIS    2025250    200200   21.9800  149.2300       8.2        85       881        96
VIS    2025250    200200   21.9800  149.2300       8.1        84       881        96
VIS    2025250    200200   21.9800  149.2000       7.6        86       903        94
VIS    2025250    200200   21.9800  149.1800       8.0        84       919        96
VIS    2025250    200200   21.9800  149.1500       9.0        83       944        98
VIS    2025250    200200   21.9700  149.1100       8.8        91       985        91
VIS    2025250    200200   21.9900  149.0800       8.2        91       957        95
VIS    2025250    200200   21.9900  149.0600       8.6        87       914        99
VIS    2025250    200200   21.9700  149.0300       8.7        85       892        98
VIS    2025250    200200   21.9800  149.0100       8.3        85       889        98
VIS    2025250    200200   21.9800  149.0000       8.2        86       890        98
VIS    2025250    200200   21.9800  148.9600       8.2        90       893        99
VIS    2025250    200200   21.9700  148.9400       8.4        89       889        99
VIS    2025250    200200   21.9700  148.9200       8.4        86       881        98
VIS    2025250    200200   21.9700  148.9000       8.3        85       877        97
VIS    2025250    200200   21.9900  148.8700       8.2        89       883        98
VIS    2025250    200200   21.9800  148.8300       8.1        91       875       100
VIS    2025250    200200   21.9800  148.8000       8.1        90       874        99
VIS    2025250    200200   21.9800  148.7800       8.3        88       875        99
VIS    2025250    200200   21.9800  148.7600       8.2        86       875        98
VIS    2025250    200200   21.9900  148.7400       8.6        87       796        92
VIS    2025250    200200   21.9800  148.7200       8.7        85       794        91
VIS    2025250    200200   21.9800  148.6800       7.9        81       797        91
VIS    2025250    200200   21.9800  148.6500       7.6        83       840        92
VIS    2025250    200200   21.9900  148.6400       7.6        84       855        94
VIS    2025250    200200   21.9800  148.6200       8.0        88       942        97
VIS    2025250    200200   21.9900  148.5800       7.8        91       942        98
VIS    2025250    200200   21.9800  148.5500       8.8        86       868        94
VIS    2025250    200200   21.9800  148.5300       9.6        86       857        91
VIS    2025250    200200   21.9800  148.5000      10.0        90       855        91
VIS    2025250    200200   21.9700  148.4900       9.8        88       856        91
VIS    2025250    200200   21.9700  148.4500       8.8        86       801        91
VIS    2025250    200200   21.9800  148.4400       9.0        87       800        92
VIS    2025250    200200   21.9900  148.3900       9.3        86       840        91
VIS    2025250    200200   21.9600  148.3700       9.3        83       860        91
VIS    2025250    200200   21.9600  148.3400       8.9        85       865        90
VIS    2025250    200200   21.9800  148.2000       8.9        91       966        95
VIS    2025250    200200   21.9700  148.1600       9.2        91       937        96
VIS    2025250    200200   21.9700  148.1500       8.9        93       937        96
VIS    2025250    200200   21.9800  148.1300       8.6        92       937        96
VIS    2025250    200200   21.9700  148.1100       8.4        94       877        98
VIS    2025250    200200   21.9600  148.0300       8.9        89       857        95
VIS    2025250    200200   21.9800  148.0000       8.7        92       856        96
VIS    2025250    200200   21.9600  147.9600       8.8        92       872        98
VIS    2025250    200200   21.9600  147.9500       9.0        90       872        98
VIS    2025250    200200   21.9700  147.9100       9.6        84       877        95
VIS    2025250    200200   21.9700  147.9000       9.7        83       877        94
VIS    2025250    200200   21.9800  147.8800      10.0        82       875        91
VIS    2025250    200200   21.9700  147.8500       9.6        85       874        93
VIS    2025250    200200   21.9700  147.8200       9.3        87       874        93
VIS    2025250    200200   21.9700  147.8000       9.1        86       874        92
VIS    2025250    200200   21.9800  147.7800       9.2        88       874        90
VIS    2025250    200200   21.9600  147.7400       9.7        95       871        96
VIS    2025250    200200   21.9700  147.7100       9.6        97       832        90
VIS    2025250    200200   21.9600  147.6800       9.4        88       894        98
VIS    2025250    200200   21.9700  147.6700       9.5        85       896        99
VIS    2025250    200200   21.9700  147.6400       9.6        78       896        97
VIS    2025250    200200   21.9700  147.6200       9.0        80       896        96
VIS    2025250    200200   21.9800  147.6000       8.8        83       892        95
VIS    2025250    200200   21.9700  147.5700       8.8        87       892        96
VIS    2025250    200200   21.9500  147.5300       8.0        91       846        90
VIS    2025250    200200   21.9700  147.5200       8.2        93       871        99
VIS    2025250    200200   21.9700  147.4900       8.2        99       860        99
VIS    2025250    200200   21.9600  147.4600       6.2        95       748        93
VIS    2025250    200200   21.9700  147.4400       6.4        89       827        94
VIS    2025250    200200   21.9700  147.4100       8.2        84       871        93
VIS    2025250    200200   21.9700  147.3900       8.2        85       856        92
VIS    2025250    200200   21.9600  147.3500       7.7        85       856        91
VIS    2025250    200200   21.9600  147.0100      10.9        82       998        94
VIS    2025250    200200   21.9700  146.9900      11.1        85       982        99
VIS    2025250    200200   21.9500  146.9800      10.9        84       971        97
VIS    2025250    200200   21.9600  146.9400      10.8        85       939        99
VIS    2025250    200200   21.9700  146.9300      10.5        84       933        98
VIS    2025250    200200   21.9700  146.8900      10.1        80       924        98
VIS    2025250    200200   21.9700  146.8800      10.3        80       933        98
VIS    2025250    200200   21.9600  146.8400      11.1        81       924        99
VIS    2025250    200200   21.9600  146.8300      11.3        83       924        98
VIS    2025250    200200   21.9500  146.7800      10.4        89       908        95
VIS    2025250    200200   21.9600  146.7800      10.3        88       906        96
VIS    2025250    200200   21.9700  146.7500      10.5        87       908        97
VIS    2025250    200200   21.9500  146.7200      10.5        84       908        98
VIS    2025250    200200   21.9500  146.7000      10.5        88       906        99
VIS    2025250    200200   21.9600  146.6800       9.9        92       844        92
VIS    2025250    200200   21.9500  146.6500      10.1        94       797        92
VIS    2025250    200200   21.9400  146.5300      10.4        84       891        97
VIS    2025250    200200   21.9600  146.5300       9.6        81       891        95
VIS    2025250    200200   21.9500  146.4800      11.9        78       962        94
VIS    2025250    200200   21.9500  146.4800      11.8        78       962        97
VIS    2025250    200200   21.9600  146.4400      11.4        77       956        96
VIS    2025250    200200   21.9400  146.4100      14.5        82       941        97
VIS    2025250    200200   21.9400  146.3800      14.0        86       940        98
VIS    2025250    200200   21.9500  146.3600      13.8        88       968        99
VIS    2025250    200200   21.9500  146.3300      13.8        86       968        99
VIS    2025250    200200   21.9400  146.3100      13.4        85       965        98
VIS    2025250    200200   21.9500  146.3000      13.4        86       965        97
VIS    2025250    200200   21.9400  146.2500      12.9        87       965        97
VIS    2025250    200200   21.9400  146.2500      12.9        87       965        98
VIS    2025250    200200   21.9400  146.2000      13.2        88       951        99
VIS    2025250    200200   21.9500  146.1800      13.2        87       969       100
VIS    2025250    200200   21.9500  146.1700      13.3        86       969       100
VIS    2025250    200200   21.9600  146.0600      13.2        86       996        96
VIS    2025250    200200   21.9600  146.0300      11.3        86       976        93
VIS    2025250    200200   21.9500  146.0200      10.7        87       948        93
VIS    2025250    200200   21.9200  144.2800       9.2       104       745        93
VIS    2025250    200200   21.9300  144.1300      10.0        98       828        90
VIS    2025250    200200   21.9400  144.0300      12.9        89       898        93
VIS    2025250    200200   21.9300  144.0200      13.0        88       898        93
VIS    2025250    200200   21.9200  143.9900      13.6        88       916        95
VIS    2025250    200200   21.9300  143.9100      13.5        91       947        98
VIS    2025250    200200   21.9300  143.8800      13.1        90       947        99
VIS    2025250    200200   21.9400  143.8700      13.3        90       946        99
VIS    2025250    200200   21.9400  143.8500      13.6        90       930        99
VIS    2025250    200200   21.9300  143.8100      13.0        93       920        98
VIS    2025250    200200   21.9200  143.7900      13.0        93       917        97
VIS    2025250    200200   21.9300  143.7700      12.5        94       912        99
VIS    2025250    200200   21.9400  143.7500      12.6        92       909        97
VIS    2025250    200200   21.9400  143.7200      13.0        91       909        96
VIS    2025250    200200   21.9400  143.7000      13.4        92       908        95
VIS    2025250    200200   21.9300  143.6600      13.2        92       913        95
VIS    2025250    200200   21.9100  143.6300      13.3        91       917        96
VIS    2025250    200200   21.9100  143.6200      13.6        89       916        94
VIS    2025250    200200   21.9200  143.5300      12.4        93       919        97
VIS    2025250    200200   21.9200  143.5200      12.3        93       921        98
VIS    2025250    200200   21.9200  143.5000      11.2        99       921        96
VIS    2025250    200200   21.9100  143.4800      10.7        98       922        97
VIS    2025250    200200   21.9200  143.4300      12.3        89       926        99
VIS    2025250    200200   21.9300  143.4200      12.5        91       926        94
VIS    2025250    200200   21.9100  143.4000      11.8        93       926        98
VIS    2025250    200200   21.9300  143.3700      11.6        88       930        97
VIS    2025250    200200   21.9100  143.3400      10.5        92       939        96
VIS    2025250    200200   21.9100  143.3300      10.7        92       939        97
VIS    2025250    200200   21.9100  143.2100      12.2        96       953        97
VIS    2025250    200200   21.9200  143.2000      12.1        96       960        96
VIS    2025250    200200   21.9300  143.1600      12.5        93       958        99
VIS    2025250    200200   21.9200  143.1500      12.2        93       948        98
VIS    2025250    200200   21.9100  143.1100      11.7        93       950        99
VIS    2025250    200200   21.9300  143.0800      10.5        92       950        99
VIS    2025250    200200   21.9300  143.0800      10.7        90       944        99
VIS    2025250    200200   21.9200  143.0500      12.1        89       931        99
VIS    2025250    200200   21.9300  143.0300      11.7        94       933        99
VIS    2025250    200200   21.9200  142.9900       9.9       101       933        92
VIS    2025250    200200   21.9300  142.9300       9.7        97       947        91
VIS    2025250    200200   21.9200  142.8600       9.4       110       946        90
VIS    2025250    200200   21.9100  142.7600       9.9        90       947        91
VIS    2025250    200200   21.9100  142.7000       9.9       102       947        96
VIS    2025250    200200   21.9200  142.6700      10.8       100       960        93
VIS    2025250    200200   21.9100  142.6400      12.4        89       969        98
VIS    2025250    200200   21.9300  142.5900       9.0        92       980        97
VIS    2025250    200200   21.9200  142.5700       8.5        97       981        96
VIS    2025250    200200   21.9100  142.5400       8.6        98       987        96
VIS    2025250    200200   21.9200  142.5300       8.2       100       987        94
VIS    2025250    200200   21.9800  150.5000       9.4        93       905        93
VIS    2025250    200200   21.9700  150.4800       8.9        94       899        95
VIS    2025250    200200   21.9700  150.4400       8.5        91       905        96
VIS    2025250    200200   21.9900  150.4100       8.9        92       939        90
VIS    2025250    200200   21.9800  150.4000       9.0        92       943        90
VIS    2025250    200200   21.9800  149.6300      11.1        96       987        91
VIS    2025250    200200   21.9600  149.4800       9.8        99       965        93
VIS    2025250    200200   21.9600  149.4600       9.6       102       923        95
VIS    2025250    200200   21.9700  149.4500       9.4        98       939        96
VIS    2025250    200200   21.9700  149.4200       9.1        89       944        98
VIS    2025250    200200   21.9700  149.3800       9.2        91       897        98
VIS    2025250    200200   21.9600  149.3700       9.2        90       886        97
VIS    2025250    200200   21.9700  149.3300       9.4        91       899        97
VIS    2025250    200200   21.9500  149.3200       9.1        88       835        95
VIS    2025250    200200   21.9600  149.2900       8.6        88       797        90
VIS    2025250    200200   21.9600  149.2500       8.4        85       857        95
VIS    2025250    200200   21.9700  149.2300       8.2        85       881        96
VIS    2025250    200200   21.9700  149.2200       8.0        84       881        95
VIS    2025250    200200   21.9700  149.1800       8.2        84       922        97
VIS    2025250    200200   21.9600  149.1500       9.5        85       944        98
VIS    2025250    200200   21.9500  149.1400       9.9        85       956        98
VIS    2025250    200200   21.9500  149.1000       8.7        87       965        97
VIS    2025250    200200   21.9500  149.0900       8.8        88       965        97
VIS    2025250    200200   21.9500  149.0500       8.9        86       943       100
VIS    2025250    200200   21.9700  149.0200       8.7        85       892        97
VIS    2025250    200200   21.9600  149.0200       8.8        85       906        98
VIS    2025250    200200   21.9500  148.9900       8.7        86       910        99
VIS    2025250    200200   21.9700  148.9500       8.4        89       903        99
VIS    2025250    200200   21.9500  148.9300       8.8        86       918        99
VIS    2025250    200200   21.9500  148.9100       8.6        83       903        98
VIS    2025250    200200   21.9500  148.8800       8.2        84       876        96
VIS    2025250    200200   21.9500  148.8400       8.3        87       874        98
VIS    2025250    200200   21.9500  148.8400       8.3        87       874        98
VIS    2025250    200200   21.9600  148.8100       8.3        90       874        99
VIS    2025250    200200   21.9600  148.7800       8.5        86       875        98
VIS    2025250    200200   21.9500  148.7500       8.0        85       876        97
VIS    2025250    200200   21.9500  148.7300       7.8        85       830        91
VIS    2025250    200200   21.9400  148.7000       7.2        86       802        90
VIS    2025250    200200   21.9600  148.6800       7.2        83       801        92
VIS    2025250    200200   21.9500  148.6500       7.5        84       802        92
VIS    2025250    200200   21.9600  148.6300       8.1        84       867        92
VIS    2025250    200200   21.9400  148.6000       7.9        81       957        99
VIS    2025250    200200   21.9600  148.5700       8.2        87       957        98
VIS    2025250    200200   21.9600  148.5500       8.9        86       888        97
VIS    2025250    200200   21.9600  148.5300       9.5        84       868        92
VIS    2025250    200200   21.9400  148.4900      10.0        84       872        92
VIS    2025250    200200   21.9500  148.4800       9.6        84       856        90
VIS    2025250    200200   21.9400  148.4600       8.9        83       857        90
VIS    2025250    200200   21.9400  148.4200       7.8        80       860        92
VIS    2025250    200200   21.9400  148.3900       8.5        81       865        93
VIS    2025250    200200   21.9600  148.3700       9.2        83       860        91
VIS    2025250    200200   21.9400  148.1800       9.6        95       952        93
VIS    2025250    200200   21.9400  148.1600       9.7        99       938        92
VIS    2025250    200200   21.9400  148.1500       9.7        99       935        92
VIS    2025250    200200   21.9400  148.1200       9.2        99       877        96
VIS    2025250    200200   21.9600  148.0900       8.9        95       872        92
VIS    2025250    200200   21.9400  148.0500       9.3        88       856        92
VIS    2025250    200200   21.9400  148.0400       9.3        88       857        93
VIS    2025250    200200   21.9400  148.0000       8.8        88       862        94
VIS    2025250    200200   21.9400  147.9800       8.8        89       880        99
VIS    2025250    200200   21.9400  147.9500       9.0        91       882        99
VIS    2025250    200200   21.9300  147.9400       9.1        90       884        99
VIS    2025250    200200   21.9500  147.9100       9.2        84       882        96
VIS    2025250    200200   21.9500  147.9000       9.4        81       880        94
VIS    2025250    200200   21.9400  147.8500       8.9        88       872        94
VIS    2025250    200200   21.9400  147.8500       9.0        89       872        93
VIS    2025250    200200   21.9500  147.8200       9.3        89       872        93
VIS    2025250    200200   21.9300  147.7800       9.7        91       874        95
VIS    2025250    200200   21.9400  147.7700       9.6        90       874        95
VIS    2025250    200200   21.9500  147.7500       9.7        94       871        95
VIS    2025250    200200   21.9500  147.6900       9.1        89       894        97
VIS    2025250    200200   21.9400  147.6500       9.4        82       898        97
VIS    2025250    200200   21.9400  147.6400       9.7        80       898        96
VIS    2025250    200200   21.9500  147.6100       9.6        81       898        97
VIS    2025250    200200   21.9500  147.5400       8.3        94       846        90
VIS    2025250    200200   21.9300  147.4000       7.8        84       775        90
VIS    2025250    200200   21.9300  147.3900       7.9        86       782        90
VIS    2025250    200200   21.9300  147.3700       7.9        87       801        90
VIS    2025250    200200   21.9400  146.9800      10.9        83       994        96
VIS    2025250    200200   21.9400  146.9700      10.9        82       971        97
VIS    2025250    200200   21.9400  146.9500      10.7        83       965        92
VIS    2025250    200200   21.9400  146.9200      10.6        80       949        92
VIS    2025250    200200   21.9400  146.8600      11.6        83       960        98
VIS    2025250    200200   21.9300  146.8500      12.4        85       965        96
VIS    2025250    200200   21.9400  146.8200      11.9        85       933        96
VIS    2025250    200200   21.9400  146.7900      10.7        89       927        94
VIS    2025250    200200   21.9400  146.7700      10.6        87       916        92
VIS    2025250    200200   21.9300  146.7300      11.1        81       935        98
VIS    2025250    200200   21.9300  146.7100      11.3        86       910        98
VIS    2025250    200200   21.9300  146.6900      11.0        92       822        91
VIS    2025250    200200   21.9400  146.6600       9.7        96       760        90
VIS    2025250    200200   21.9400  146.5300      10.5        84       898        98
VIS    2025250    200200   21.9300  146.5200      11.7        84       898        97
VIS    2025250    200200   21.9400  146.5000      12.6        83       949        98
VIS    2025250    200200   21.9200  146.4600      12.9        87       956        93
VIS    2025250    200200   21.9200  146.4400      13.4        88       955        96
VIS    2025250    200200   21.9200  146.4100      15.1        86       938        96
VIS    2025250    200200   21.9400  146.3800      14.2        87       940        98
VIS    2025250    200200   21.9200  146.3500      13.2        89       943        99
VIS    2025250    200200   21.9300  146.3300      13.5        84       967        99
VIS    2025250    200200   21.9300  146.3200      13.5        84       967        99
VIS    2025250    200200   21.9100  146.3000      13.2        85       957        97
VIS    2025250    200200   21.9300  146.2500      12.8        88       965        96
VIS    2025250    200200   21.9300  146.2500      12.9        88       960        97
VIS    2025250    200200   21.9100  146.2200      12.5        89       900        92
VIS    2025250    200200   21.9200  146.0700      12.7        89       974        91
VIS    2025250    200200   21.9200  144.3200       9.4       118       739        97
VIS    2025250    200200   21.9200  144.2900       8.9       107       744        90
VIS    2025250    200200   21.9100  144.2500      10.2       107       747        96
VIS    2025250    200200   21.9000  144.1200      11.9       101       765        90
VIS    2025250    200200   21.8900  144.0400      13.1        90       868        90
VIS    2025250    200200   21.9100  144.0100      12.8        87       892        92
VIS    2025250    200200   21.9000  143.8800      14.1        92       960        97
VIS    2025250    200200   21.9100  143.8500      14.0        92       939        98
VIS    2025250    200200   21.9100  143.8500      13.9        92       930        98
VIS    2025250    200200   21.8900  143.8000      13.6        93       919        97
VIS    2025250    200200   21.8900  143.7800      12.9        92       917        98
VIS    2025250    200200   21.8900  143.7600      11.9        90       912        98
VIS    2025250    200200   21.8900  143.7300      11.8        89       910        99
VIS    2025250    200200   21.8900  143.7200      12.0        89       910        99
VIS    2025250    200200   21.8900  143.6800      12.9        91       913        98
VIS    2025250    200200   21.8900  143.6700      12.9        91       916        98
VIS    2025250    200200   21.9100  143.6300      13.3        91       917        95
VIS    2025250    200200   21.9000  143.6200      13.6        90       917        96
VIS    2025250    200200   21.9000  143.5400      12.7        93       919        91
VIS    2025250    200200   21.8900  143.5200      12.3        95       919        94
VIS    2025250    200200   21.9100  143.5000      11.1       102       919        94
VIS    2025250    200200   21.8900  143.4600      11.6        92       924        98
VIS    2025250    200200   21.9000  143.4400      12.1        89       924        98
VIS    2025250    200200   21.9000  143.4200      12.1        93       924        97
VIS    2025250    200200   21.9100  143.4000      11.9        94       926        99
VIS    2025250    200200   21.9000  143.3600      10.6       100       929        93
VIS    2025250    200200   21.9000  143.3500      10.3       101       929        93
VIS    2025250    200200   21.9100  143.2400       9.7       109       945        92
VIS    2025250    200200   21.8900  143.2100      12.5        93       944        98
VIS    2025250    200200   21.8900  143.1800      12.6        92       944        99
VIS    2025250    200200   21.8900  143.1800      12.5        93       933        99
VIS    2025250    200200   21.8900  143.1400      12.5        92       932        99
VIS    2025250    200200   21.8900  143.1200      12.6        92       931        99
VIS    2025250    200200   21.8900  143.1000      12.6        93       930        99
VIS    2025250    200200   21.8900  143.0800      11.1        93       930        95
VIS    2025250    200200   21.8900  143.0400      10.7        95       930        96
VIS    2025250    200200   21.8800  143.0300      11.3       102       930        94
VIS    2025250    200200   21.8800  142.9200      12.0        92       935        97
VIS    2025250    200200   21.8800  142.8800      12.9        99       929        91
VIS    2025250    200200   21.8800  142.8700      12.4       101       931        91
VIS    2025250    200200   21.8800  142.8500      10.6       104       933        95
VIS    2025250    200200   21.8800  142.7800       9.4        94       944        94
VIS    2025250    200200   21.9000  142.7600      10.1        89       947        95
VIS    2025250    200200   21.8800  142.7500      11.3        88       936       100
VIS    2025250    200200   21.8900  142.7200      11.1        94       947        99
VIS    2025250    200200   21.9000  142.7000      11.7        96       947        99
VIS    2025250    200200   21.9000  142.6700      12.3        94       954        96
VIS    2025250    200200   21.8900  142.6500      12.8        89       965        96
VIS    2025250    200200   21.9000  142.6300      12.6        90       969        97
VIS    2025250    200200   21.8800  142.6000      13.6        91       980        97
VIS    2025250    200200   21.8800  142.5600      11.8        85       984        97
VIS    2025250    200200   21.8800  142.5400      11.1        88       984        99
VIS    2025250    200200   21.8900  142.5300      10.2        91       984        99
VIS    2025250    200200   21.8900  142.5100       8.9        96       987        96
VIS    2025250    200200   21.9500  150.5000       9.0        92       935        90
VIS    2025250    200200   21.9600  150.4900       9.0        93       908        94
VIS    2025250    200200   21.9400  150.4600       8.3        89       908        95
VIS    2025250    200200   21.9600  150.4400       8.4        90       905        96
VIS    2025250    200200   21.9400  150.4100       8.9        89       950        90
VIS    2025250    200200   21.9500  149.5900      11.3        92       963        90
VIS    2025250    200200   21.9500  149.5100      10.6       100       965        90
VIS    2025250    200200   21.9400  149.4600      10.3       101       923        92
VIS    2025250    200200   21.9300  149.4400       9.8       100       940        94
VIS    2025250    200200   21.9300  149.4100       9.1        94       939        97
VIS    2025250    200200   21.9300  149.4000       9.1        92       939        98
VIS    2025250    200200   21.9300  149.3600       9.1        85       872        95
VIS    2025250    200200   21.9300  149.3500       9.1        85       871        96
VIS    2025250    200200   21.9500  149.3200       9.0        87       814        92
VIS    2025250    200200   21.9300  149.2900       8.1        85       797        90
VIS    2025250    200200   21.9300  149.2500       7.6        85       878        95
VIS    2025250    200200   21.9300  149.2200       7.9        85       918        98
VIS    2025250    200200   21.9200  149.1800       9.1        86       937        99
VIS    2025250    200200   21.9400  149.1500       9.9        85       944        98
VIS    2025250    200200   21.9200  149.1400       9.4        84       942        99
VIS    2025250    200200   21.9400  149.1100       9.0        86       957        98
VIS    2025250    200200   21.9400  149.0900       9.0        85       948        99
VIS    2025250    200200   21.9400  149.0600       9.0        84       945       100
VIS    2025250    200200   21.9300  149.0400       9.0        82       945       100
VIS    2025250    200200   21.9200  149.0000       8.6        82       916        99
VIS    2025250    200200   21.9200  148.9700       8.8        83       910        99
VIS    2025250    200200   21.9300  148.9600       9.3        84       910        98
VIS    2025250    200200   21.9200  148.9400       9.2        84       916        99
VIS    2025250    200200   21.9400  148.9000       8.4        83       885        96
VIS    2025250    200200   21.9300  148.8800       8.1        86       876        97
VIS    2025250    200200   21.9300  148.8500       8.4        87       874        98
VIS    2025250    200200   21.9400  148.8400       8.4        87       874        98
VIS    2025250    200200   21.9400  148.8000       8.4        87       874        98
VIS    2025250    200200   21.9200  148.7700       8.2        86       876        95
VIS    2025250    200200   21.9200  148.7600       8.1        86       876        94
VIS    2025250    200200   21.9400  148.7400       7.6        85       872        93
VIS    2025250    200200   21.9400  148.6900       7.0        87       801        90
VIS    2025250    200200   21.9300  148.6500       7.6        87       800        90
VIS    2025250    200200   21.9200  148.5700       8.1        80       979        99
VIS    2025250    200200   21.9300  148.5500       8.5        87       942        99
VIS    2025250    200200   21.9200  148.5100       9.3        84       891        96
VIS    2025250    200200   21.9300  148.5000      10.1        83       874        92
VIS    2025250    200200   21.9400  148.4900      10.0        83       874        92
VIS    2025250    200200   21.9300  148.4400       8.1        79       860        92
VIS    2025250    200200   21.9300  148.4300       8.0        79       860        91
VIS    2025250    200200   21.9300  148.3900       8.1        80       869        93
VIS    2025250    200200   21.9300  148.3800       8.4        81       869        93
VIS    2025250    200200   21.9300  148.3500      10.0        84       947        96
VIS    2025250    200200   21.9100  148.3200       9.9        85       979        95
VIS    2025250    200200   21.9200  148.1900       9.8        97       952        94
VIS    2025250    200200   21.9300  148.1600       9.8       100       949        92
VIS    2025250    200200   21.9200  148.1300       9.8       101       914        95
VIS    2025250    200200   21.9100  148.1200       9.1        96       914        93
VIS    2025250    200200   21.9300  148.0500       9.4        87       856        93
VIS    2025250    200200   21.9200  148.0200       9.2        87       861        94
VIS    2025250    200200   21.9200  148.0000       8.9        87       869        96
VIS    2025250    200200   21.9300  147.9800       8.8        90       880        99
VIS    2025250    200200   21.9100  147.9500       9.4        91       884        98
VIS    2025250    200200   21.9100  147.9400       9.4        89       884        97
VIS    2025250    200200   21.9100  147.9200       9.5        83       879        92
VIS    2025250    200200   21.9100  147.8800       9.1        83       874        92
VIS    2025250    200200   21.9100  147.8600       8.6        87       872        93
VIS    2025250    200200   21.9100  147.8300       9.1        90       872        95
VIS    2025250    200200   21.9100  147.8000       9.4        87       872        95
VIS    2025250    200200   21.9100  147.7700       9.1        87       875        96
VIS    2025250    200200   21.9100  147.7600       9.3        90       875        97
VIS    2025250    200200   21.9300  147.7100       9.0        88       843        90
VIS    2025250    200200   21.9000  147.6700       9.1        84       898        96
VIS    2025250    200200   21.9100  147.6600       9.1        83       898        96
VIS    2025250    200200   21.9200  147.6300       9.4        84       888        94
VIS    2025250    200200   21.9200  147.6100       9.1        90       884        93
VIS    2025250    200200   21.9200  147.3900       7.8        86       782        90
VIS    2025250    200200   21.9200  147.3400       7.8        86       872        92
VIS    2025250    200200   21.9000  146.7700      10.6        80       962        97
VIS    2025250    200200   21.9100  146.7600      10.9        79       960        92
VIS    2025250    200200   21.8900  146.7200      11.6        90       946        98
VIS    2025250    200200   21.9100  146.7000      11.2        95       822        92
VIS    2025250    200200   21.9100  146.6800      10.9        94       767        90
VIS    2025250    200200   21.8900  146.5800      10.7        91       842        91
VIS    2025250    200200   21.9000  146.5600      10.7        85       868        91
VIS    2025250    200200   21.8900  146.4900      13.2        93       883        90
VIS    2025250    200200   21.9100  146.4800      13.9        90       925        98
VIS    2025250    200200   21.9000  146.4500      13.1        88       945        90
VIS    2025250    200200   21.8900  146.4200      13.8        90       896        91
VIS    2025250    200200   21.8900  146.3700      13.2        90       901        96
VIS    2025250    200200   21.9100  146.3500      12.7        89       906        98
VIS    2025250    200200   21.8900  146.3200      12.2        86       944       100
VIS    2025250    200200   21.9000  146.3000      12.8        86       956        98
VIS    2025250    200200   21.8900  146.2600      12.8        86       936        99
VIS    2025250    200200   21.9000  146.2400      12.5        88       906        93
VIS    2025250    200200   21.8900  146.0600      13.3        83       974        99
VIS    2025250    200200   21.8900  146.0400      13.4        84       973       100
VIS    2025250    200200   21.9100  146.0300      11.0        91       947        97
VIS    2025250    200200   21.8800  144.3400       9.9       126       739        98
VIS    2025250    200200   21.8700  144.3200      10.2       127       741        98
VIS    2025250    200200   21.8700  144.2900       8.9       110       744        98
VIS    2025250    200200   21.8700  144.2600       8.9       110       744        97
VIS    2025250    200200   21.8900  143.8900      14.3        90       968        96
VIS    2025250    200200   21.8900  143.8800      14.4        90       968        96
VIS    2025250    200200   21.8800  143.8400      13.9        92       946        95
VIS    2025250    200200   21.8800  143.8200      14.0        92       963        95
VIS    2025250    200200   21.8800  143.8000      13.7        92       932        97
VIS    2025250    200200   21.8900  143.7800      12.8        91       917        98
VIS    2025250    200200   21.8900  143.7600      12.1        90       914        98
VIS    2025250    200200   21.8800  143.7100      11.6        91       916        99
VIS    2025250    200200   21.8800  143.7100      11.8        91       916        99
VIS    2025250    200200   21.8800  143.6800      12.6        92       916        98
VIS    2025250    200200   21.8700  143.6400      12.7        91       948        99
VIS    2025250    200200   21.8700  143.6200      13.5        88       943        98
VIS    2025250    200200   21.8700  143.6000      13.1        89       923        97
VIS    2025250    200200   21.8800  143.5700      12.7        92       920        92
VIS    2025250    200200   21.8800  143.5400      12.7        93       920        94
VIS    2025250    200200   21.8600  143.5100      12.6        90       923        98
VIS    2025250    200200   21.8700  143.5100      12.4        94       919        94
VIS    2025250    200200   21.8700  143.4700      12.3        92       930        98
VIS    2025250    200200   21.8600  143.4500      11.7        89       939        97
VIS    2025250    200200   21.8700  143.4100      11.7        95       925        97
VIS    2025250    200200   21.8800  143.4000      12.2        96       924        98
VIS    2025250    200200   21.8800  143.3700      11.6       101       928        96
VIS    2025250    200200   21.8700  143.3500      11.8       100       929        95
VIS    2025250    200200   21.8700  143.3100      10.5       104       929        93
VIS    2025250    200200   21.8700  143.3000      10.3       103       927        96
VIS    2025250    200200   21.8600  143.2700      11.3        96       927        98
VIS    2025250    200200   21.8600  143.2500      11.6        95       927        99
VIS    2025250    200200   21.8800  143.2200      12.2        93       933        99
VIS    2025250    200200   21.8700  143.1900      12.6        91       933        99
VIS    2025250    200200   21.8800  143.1800      12.4        91       932        99
VIS    2025250    200200   21.8800  143.1500      12.6        91       932        99
VIS    2025250    200200   21.8800  143.1200      13.0        91       930        99
VIS    2025250    200200   21.8700  143.1100      13.1        90       930        98
VIS    2025250    200200   21.8800  143.0900      12.0        93       930        97
VIS    2025250    200200   21.8800  143.0500      10.1        97       930        94
VIS    2025250    200200   21.8800  143.0400      10.5       101       930        95
VIS    2025250    200200   21.8700  142.9200      12.3        91       934        98
VIS    2025250    200200   21.8700  142.9100      13.6        91       930        98
VIS    2025250    200200   21.8700  142.8700      13.1        96       930        97
VIS    2025250    200200   21.8700  142.8600      12.5        97       933        97
VIS    2025250    200200   21.8800  142.8300      10.5       105       935        92
VIS    2025250    200200   21.8700  142.7900       9.5        99       936        90
VIS    2025250    200200   21.8700  142.7800       9.8        95       935        95
VIS    2025250    200200   21.8600  142.7500      12.3        89       934        99
VIS    2025250    200200   21.8600  142.7200      12.9        92       934        96
VIS    2025250    200200   21.8800  142.7000      12.6        92       945        97
VIS    2025250    200200   21.8600  142.6900      12.4        93       947        96
VIS    2025250    200200   21.8600  142.6400      11.3        91       954        97
VIS    2025250    200200   21.8600  142.6200      12.7        93       965        97
VIS    2025250    200200   21.8600  142.6100      13.2        93       975        97
VIS    2025250    200200   21.8700  142.5800      13.1        89       980        98
VIS    2025250    200200   21.8600  142.5400      12.0        85       971        99
VIS    2025250    200200   21.8700  142.5300      11.5        87       972        97
VIS    2025250    200200   21.8600  142.5000       9.7        96       971        96
VIS    2025250    200200   21.8600  142.4900      10.5        97       971        94
VIS    2025250    200200   21.8700  142.4700       9.9       100       984        96
VIS    2025250    200200   21.8600  142.4400       9.8       100       986        96
VIS    2025250    200200   21.8600  142.4100       9.9       101       973        95
VIS    2025250    200200   21.9300  150.4800       8.8        89       932        92
VIS    2025250    200200   21.9200  150.4500       8.8        86       933        91
VIS    2025250    200200   21.9200  150.4500       8.6        86       935        91
VIS    2025250    200200   21.9400  150.4200       8.7        89       947        90
VIS    2025250    200200   21.9200  149.5800      11.3        98       981        90
VIS    2025250    200200   21.9000  149.5600      10.9        97       972        92
VIS    2025250    200200   21.9100  149.5300      10.9        96       964        91
VIS    2025250    200200   21.9000  149.4800      11.6        92       940        91
VIS    2025250    200200   21.9100  149.4600      11.2        93       940        92
VIS    2025250    200200   21.9100  149.4200       9.5        96       899        97
VIS    2025250    200200   21.9000  149.4000       9.1        91       881        98
VIS    2025250    200200   21.9100  149.3800       9.1        87       871        96
VIS    2025250    200200   21.9200  149.3500       9.0        85       871        96
VIS    2025250    200200   21.9000  149.3300       8.4        88       814        93
VIS    2025250    200200   21.9200  149.3000       8.1        86       797        90
VIS    2025250    200200   21.9200  149.2900       8.1        85       797        90
VIS    2025250    200200   21.9200  149.2500       7.5        85       878        95
VIS    2025250    200200   21.9200  149.2300       7.6        84       916        98
VIS    2025250    200200   21.9200  149.2000       8.3        86       937        99
VIS    2025250    200200   21.9000  149.1800       9.0        85       937       100
VIS    2025250    200200   21.9200  149.1500       9.4        85       941        99
VIS    2025250    200200   21.9100  149.1200       9.0        84       924       100
VIS    2025250    200200   21.9100  149.1100       9.1        84       919        99
VIS    2025250    200200   21.9000  149.0800       9.2        82       918        99
VIS    2025250    200200   21.9100  149.0500       8.9        79       945       100
VIS    2025250    200200   21.9000  149.0400       8.9        78       945        99
VIS    2025250    200200   21.9100  148.9900       8.7        81       921        96
VIS    2025250    200200   21.9200  148.9800       8.7        83       910        99
VIS    2025250    200200   21.9100  148.9500       9.0        84       898        96
VIS    2025250    200200   21.9100  148.9400       8.8        85       892        97
VIS    2025250    200200   21.9000  148.8900       7.9        92       877        98
VIS    2025250    200200   21.8900  148.8700       7.9        92       876        99
VIS    2025250    200200   21.9000  148.8500       8.2        91       874        99
VIS    2025250    200200   21.9100  148.8300       8.4        86       874        97
VIS    2025250    200200   21.9100  148.7900       8.4        85       875        96
VIS    2025250    200200   21.9100  148.7800       8.3        86       876        96
VIS    2025250    200200   21.9000  148.6900       8.1        84       797        92
VIS    2025250    200200   21.9100  148.6800       7.9        86       797        92
VIS    2025250    200200   21.9100  148.5800       8.1        74       979        98
VIS    2025250    200200   21.8900  148.5300       8.5        87       943        96
VIS    2025250    200200   21.9000  148.5200       8.6        87       942        98
VIS    2025250    200200   21.8900  148.4900       9.2        88       937        98
VIS    2025250    200200   21.8900  148.3800       9.4        80       975        96
VIS    2025250    200200   21.9100  148.3600      10.0        82       966        97
VIS    2025250    200200   21.9000  148.3500      10.0        83       975        97
VIS    2025250    200200   21.8900  148.3200       9.5        85       964        98
VIS    2025250    200200   21.8900  148.2400      10.9        85       962        98
VIS    2025250    200200   21.8900  148.2100      10.3        82       989        99
VIS    2025250    200200   21.9000  148.1800       9.8        95       970        96
VIS    2025250    200200   21.8900  148.1600       9.6        98       952        95
VIS    2025250    200200   21.8900  148.1300       9.4        98       877        96
VIS    2025250    200200   21.9100  148.1200       9.0        95       911        94
VIS    2025250    200200   21.8900  148.0800       9.0        88       852        92
VIS    2025250    200200   21.8900  148.0500       8.8        90       857        95
VIS    2025250    200200   21.8900  148.0400       8.7        89       859        95
VIS    2025250    200200   21.9000  148.0000       8.5        90       870        98
VIS    2025250    200200   21.9000  148.0000       8.7        90       870        97
VIS    2025250    200200   21.8900  147.9500       9.3        90       874        96
VIS    2025250    200200   21.8900  147.9300       9.4        88       867        93
VIS    2025250    200200   21.8900  147.9000       9.6        83       875        92
VIS    2025250    200200   21.8800  147.8700       8.9        83       869        93
VIS    2025250    200200   21.8900  147.8700       8.9        84       870        93
VIS    2025250    200200   21.8800  147.8300       8.7        86       869        94
VIS    2025250    200200   21.8900  147.8200       9.4        86       872        94
VIS    2025250    200200   21.8900  147.7800       9.2        87       875        95
VIS    2025250    200200   21.9000  147.7600       9.1        90       875        97
VIS    2025250    200200   21.9000  147.7400       9.7        91       874        97
VIS    2025250    200200   21.8800  147.7000       9.8        88       886        95
VIS    2025250    200200   21.8800  147.6800       9.8        92       890        95
VIS    2025250    200200   21.8900  147.6600       9.3        86       898        95
VIS    2025250    200200   21.8800  147.4600       7.5       101       711        92
VIS    2025250    200200   21.9000  147.4300       6.5        96       712        91
VIS    2025250    200200   21.9000  147.3900       7.4        93       741        92
VIS    2025250    200200   21.9000  147.3700       8.1        91       813        93
VIS    2025250    200200   21.8700  146.7700       9.3        77       983        96
VIS    2025250    200200   21.8700  146.7400      10.4        88       946        97
VIS    2025250    200200   21.8900  146.5900      10.8        89       830        90
VIS    2025250    200200   21.8700  146.5100      11.0        98       798        93
VIS    2025250    200200   21.8700  146.5000      11.1        97       798        92
VIS    2025250    200200   21.8700  146.4600      12.1        90       870        93
VIS    2025250    200200   21.8800  146.4500      13.0        88       906        94
VIS    2025250    200200   21.8800  146.3300      11.7        86       935       100
VIS    2025250    200200   21.8800  146.3200      11.9        86       944       100
VIS    2025250    200200   21.8800  146.2800      12.9        85       957       100
VIS    2025250    200200   21.8800  146.2500      12.5        87       936       100
VIS    2025250    200200   21.8700  146.2400      11.9        87       936       100
VIS    2025250    200200   21.8700  146.0600      13.2        82       973        99
VIS    2025250    200200   21.8700  146.0300      12.6        85       923        97
VIS    2025250    200200   21.8600  144.3300      10.1       127       741        98
VIS    2025250    200200   21.8600  144.3000       9.4       121       744       100
VIS    2025250    200200   21.8600  144.2900       8.7       114       744        99
VIS    2025250    200200   21.8600  144.2700       8.6       107       744        96
VIS    2025250    200200   21.8600  143.8700      14.4        87       973        96
VIS    2025250    200200   21.8500  143.8600      14.1        87       973        98
VIS    2025250    200200   21.8600  143.8300      14.1        90       966        97
VIS    2025250    200200   21.8600  143.8200      13.9        90       966        96
VIS    2025250    200200   21.8400  143.7500      13.4        89       972        93
VIS    2025250    200200   21.8600  143.6700      11.9        98       951        90
VIS    2025250    200200   21.8500  143.6500      12.6        94       969        97
VIS    2025250    200200   21.8600  143.6200      13.3        90       952        97
VIS    2025250    200200   21.8500  143.6200      13.2        90       959        97
VIS    2025250    200200   21.8400  143.5700      12.5        88       947       100
VIS    2025250    200200   21.8500  143.5600      12.3        90       938        99
VIS    2025250    200200   21.8500  143.5200      12.2        89       923        97
VIS    2025250    200200   21.8400  143.5200      12.2        88       923        97
VIS    2025250    200200   21.8500  143.4900      12.7        89       926        98
VIS    2025250    200200   21.8400  143.4700      12.5        87       938       100
VIS    2025250    200200   21.8400  143.4400      11.9        90       939        99
VIS    2025250    200200   21.8400  143.4200      12.3        91       937        99
VIS    2025250    200200   21.8400  143.3800      12.5        92       930        97
VIS    2025250    200200   21.8400  143.3500      12.5        95       930        95
VIS    2025250    200200   21.8400  143.3200      11.6        95       929        99
VIS    2025250    200200   21.8400  143.3200      11.5        95       929        99
VIS    2025250    200200   21.8400  143.2900      11.5        92       927        99
VIS    2025250    200200   21.8500  143.2500      12.1        92       927        98
VIS    2025250    200200   21.8500  143.2400      12.2        92       928        98
VIS    2025250    200200   21.8600  143.2200      12.1        92       929        99
VIS    2025250    200200   21.8400  143.1800      12.3        90       929        99
VIS    2025250    200200   21.8500  143.1500      12.7        90       934        98
VIS    2025250    200200   21.8600  143.1400      12.8        90       933        98
VIS    2025250    200200   21.8300  143.1100      13.3        89       933        98
VIS    2025250    200200   21.8300  143.0900      13.1        90       932        98
VIS    2025250    200200   21.8300  143.0500       9.7       101       945        91
VIS    2025250    200200   21.8300  142.9800      11.0        95       949        94
VIS    2025250    200200   21.8400  142.9500      10.0        99       944        94
VIS    2025250    200200   21.8300  142.9300      11.3        91       933        98
VIS    2025250    200200   21.8300  142.9100      13.6        87       928        98
VIS    2025250    200200   21.8300  142.8900      13.6        87       930        98
VIS    2025250    200200   21.8300  142.8700      13.6        89       935        98
VIS    2025250    200200   21.8300  142.8400      12.4        92       935        99
VIS    2025250    200200   21.8400  142.8200      11.7        96       933        99
VIS    2025250    200200   21.8300  142.7800      11.2        96       932        97
VIS    2025250    200200   21.8300  142.7700      11.4        95       932        97
VIS    2025250    200200   21.8500  142.7300      13.1        91       932        95
VIS    2025250    200200   21.8500  142.7200      13.0        91       932        95
VIS    2025250    200200   21.8400  142.6900      11.7        92       936        99
VIS    2025250    200200   21.8300  142.6500      10.7        90       936       100
VIS    2025250    200200   21.8300  142.6500      10.6        90       935       100
VIS    2025250    200200   21.8400  142.6100      12.5        93       938        98
VIS    2025250    200200   21.8400  142.5800      12.8        90       947        99
VIS    2025250    200200   21.8500  142.5700      12.8        87       970        98
VIS    2025250    200200   21.8400  142.5400      12.2        91       952        98
VIS    2025250    200200   21.8500  142.5200      10.5        92       970        99
VIS    2025250    200200   21.8400  142.4800      10.7        96       976        97
VIS    2025250    200200   21.8400  142.4700      10.6        97       976        98
VIS    2025250    200200   21.8500  142.4400       9.8        98       984        96
VIS    2025250    200200   21.8400  142.4200      10.0       100       961        97
VIS    2025250    200200   21.9100  150.4500       8.9        87       935        91
VIS    2025250    200200   21.9100  150.4400       8.8        88       947        90
VIS    2025250    200200   21.9100  150.4100       8.6        89       958        91
VIS    2025250    200200   21.8800  149.5300      10.5        93       960        94
VIS    2025250    200200   21.8800  149.5200      10.2        93       960        94
VIS    2025250    200200   21.8800  149.5000      10.6        93       962        93
VIS    2025250    200200   21.9000  149.4700      11.5        92       940        91
VIS    2025250    200200   21.8900  149.4300      10.1        93       893        95
VIS    2025250    200200   21.8900  149.4100       9.1        90       874        97
VIS    2025250    200200   21.8900  149.4000       9.0        90       874        98
VIS    2025250    200200   21.9000  149.3600       8.7        86       801        90
VIS    2025250    200200   21.8900  149.3300       8.0        88       801        92
VIS    2025250    200200   21.9000  149.3300       8.2        89       814        94
VIS    2025250    200200   21.8900  149.3000       7.7        87       866        90
VIS    2025250    200200   21.9000  149.2700       7.5        85       878        91
VIS    2025250    200200   21.8900  149.2300       7.5        86       928        99
VIS    2025250    200200   21.8700  149.2000       8.4        86       942        99
VIS    2025250    200200   21.8700  149.1900       8.6        85       942        99
VIS    2025250    200200   21.8800  149.1700       8.9        84       942       100
VIS    2025250    200200   21.8900  149.1300       9.2        84       929        99
VIS    2025250    200200   21.8900  149.1000       9.2        83       919        99
VIS    2025250    200200   21.8900  149.0500       9.0        79       942       100
VIS    2025250    200200   21.8800  149.0300       8.8        77       942        97
VIS    2025250    200200   21.8800  149.0200       8.6        77       948        95
VIS    2025250    200200   21.8800  148.9400       8.2        84       878        97
VIS    2025250    200200   21.8900  148.9000       8.0        90       878        98
VIS    2025250    200200   21.8900  148.8900       7.9        92       877        99
VIS    2025250    200200   21.8700  148.8600       8.1        94       876        99
VIS    2025250    200200   21.8800  148.8400       8.1        91       876        99
VIS    2025250    200200   21.8900  148.8000       7.9        85       877        98
VIS    2025250    200200   21.8900  148.7900       7.9        86       877        98
VIS    2025250    200200   21.8700  148.7400       7.5        87       798        93
VIS    2025250    200200   21.8800  148.7400       7.4        88       798        93
VIS    2025250    200200   21.8800  148.7100       7.3        83       796        91
VIS    2025250    200200   21.8700  148.6800       7.6        81       801        91
VIS    2025250    200200   21.8700  148.6600       7.3        84       802        92
VIS    2025250    200200   21.8700  148.5800       8.5        75       967        98
VIS    2025250    200200   21.8700  148.5500       8.4        86       943        98
VIS    2025250    200200   21.8900  148.5400       8.4        87       943        96
VIS    2025250    200200   21.8700  148.4900       8.2        88       892        98
VIS    2025250    200200   21.8700  148.4600       7.9        89       954        95
VIS    2025250    200200   21.8600  148.4300       8.0        87       961        97
VIS    2025250    200200   21.8600  148.3900       8.2        81       954        98
VIS    2025250    200200   21.8600  148.3800       8.4        81       954        98
VIS    2025250    200200   21.8700  148.3400       9.3        84       940       100
VIS    2025250    200200   21.8800  148.2600      11.0        86       962        96
VIS    2025250    200200   21.8700  148.2200      10.7        81       979        98
VIS    2025250    200200   21.8700  148.2100      10.2        84       979        99
VIS    2025250    200200   21.8700  148.1700       9.3        92       952        97
VIS    2025250    200200   21.8800  148.1400       9.4        98       877        95
VIS    2025250    200200   21.8800  148.1300       9.4        97       877        95
VIS    2025250    200200   21.8600  148.0900      10.0        99       844        94
VIS    2025250    200200   21.8600  148.0600       9.1        95       859        97
VIS    2025250    200200   21.8700  148.0500       8.7        92       859        96
VIS    2025250    200200   21.8600  148.0100       6.9        94       870        97
VIS    2025250    200200   21.8600  148.0000       6.6        97       869        96
VIS    2025250    200200   21.8700  147.9600       8.5        90       866        97
VIS    2025250    200200   21.8700  147.9400       8.9        87       866        95
VIS    2025250    200200   21.8600  147.9100       8.3        82       867        93
VIS    2025250    200200   21.8600  147.8900       8.5        81       867        92
VIS    2025250    200200   21.8600  147.8600       8.2        85       866        94
VIS    2025250    200200   21.8700  147.8500       8.4        86       869        91
VIS    2025250    200200   21.8600  147.8000       9.9        93       867        95
VIS    2025250    200200   21.8800  147.8000       9.6        87       874        95
VIS    2025250    200200   21.8800  147.7600       9.9        95       874        95
VIS    2025250    200200   21.8500  147.7500      10.4        97       874        96
VIS    2025250    200200   21.8700  147.7000       9.6        93       882        99
VIS    2025250    200200   21.8600  147.6900       9.7        96       882        92
VIS    2025250    200200   21.8700  147.6700       9.9        94       880        91
VIS    2025250    200200   21.8600  147.4900       7.5        95       710        90
VIS    2025250    200200   21.8600  147.4600       8.8       110       708        93
VIS    2025250    200200   21.8700  147.4500       8.6       111       706        92
VIS    2025250    200200   21.8500  147.4100       9.4       107       739        95
VIS    2025250    200200   21.8700  147.4000       8.5       107       741        97
VIS    2025250    200200   21.8600  147.3400      11.4        85       976        99
VIS    2025250    200200   21.8400  146.7900      11.6        84       983        99
VIS    2025250    200200   21.8500  146.7700       9.3        80       958        97
VIS    2025250    200200   21.8600  146.7400       9.8        88       958        96
VIS    2025250    200200   21.8600  146.7400      10.2        89       946        97
VIS    2025250    200200   21.8600  146.4700      11.8        89       843        90
VIS    2025250    200200   21.8600  146.2400      11.8        85       936        99
VIS    2025250    200200   21.8400  143.8600      14.1        88       985        98
VIS    2025250    200200   21.8300  143.7600      13.5        88       971        95
VIS    2025250    200200   21.8200  143.6900      11.6        92       970        93
VIS    2025250    200200   21.8200  143.6800      11.1        95       975        98
VIS    2025250    200200   21.8100  143.6400      12.8        89       969        98
VIS    2025250    200200   21.8100  143.6300      12.8        89       969        98
VIS    2025250    200200   21.8100  143.6000      12.9        88       938       100
VIS    2025250    200200   21.8100  143.5600      13.0        87       927        99
VIS    2025250    200200   21.8100  143.5400      12.6        87       923        99
VIS    2025250    200200   21.8300  143.5200      12.2        87       923        97
VIS    2025250    200200   21.8200  143.5100      12.3        87       922        97
VIS    2025250    200200   21.8200  143.4700      12.1        87       925       100
VIS    2025250    200200   21.8300  143.4600      12.3        88       937       100
VIS    2025250    200200   21.8300  143.4300      12.5        90       939       100
VIS    2025250    200200   21.8100  143.4100      12.3        89       939       100
VIS    2025250    200200   21.8200  143.3800      12.6        90       930        99
VIS    2025250    200200   21.8100  143.3600      12.0        91       940        98
VIS    2025250    200200   21.8300  143.3200      11.0        95       929        98
VIS    2025250    200200   21.8300  143.3100      11.0        95       929        99
VIS    2025250    200200   21.8300  143.2900      11.5        93       928        99
VIS    2025250    200200   21.8100  143.2400      13.0        90       929        98
VIS    2025250    200200   21.8100  143.2400      13.1        90       929        98
VIS    2025250    200200   21.8100  143.2000      12.2        90       929       100
VIS    2025250    200200   21.8200  143.1800      11.8        90       929       100
VIS    2025250    200200   21.8300  143.1600      12.1        90       943       100
VIS    2025250    200200   21.8100  143.1300      12.5        89       944        99
VIS    2025250    200200   21.8300  143.1000      13.5        89       933        97
VIS    2025250    200200   21.8300  143.0900      13.0        92       932        97
VIS    2025250    200200   21.8300  143.0600      10.2        97       945        92
VIS    2025250    200200   21.8100  143.0300      10.8        92       958        94
VIS    2025250    200200   21.8100  143.0000      12.6        91       958        98
VIS    2025250    200200   21.8200  142.9700      12.4        90       947        99
VIS    2025250    200200   21.8100  142.9500      12.1        92       947        99
VIS    2025250    200200   21.8300  142.9300      12.1        90       933        99
VIS    2025250    200200   21.8200  142.8900      14.0        87       935        97
VIS    2025250    200200   21.8300  142.8700      13.7        88       935        98
VIS    2025250    200200   21.8300  142.8700      13.5        88       935        98
VIS    2025250    200200   21.8200  142.8200      12.0        90       931       100
VIS    2025250    200200   21.8200  142.8200      12.1        92       931        99
VIS    2025250    200200   21.8300  142.7700      11.3        96       935        97
VIS    2025250    200200   21.8300  142.7700      11.5        95       935        98
VIS    2025250    200200   21.8200  142.7400      12.2        92       932        98
VIS    2025250    200200   21.8300  142.7000      11.8        93       936        99
VIS    2025250    200200   21.8200  142.6800      11.5        93       936       100
VIS    2025250    200200   21.8200  142.6700      11.0        91       936       100
VIS    2025250    200200   21.8200  142.6200      11.5        91       930        99
VIS    2025250    200200   21.8100  142.6000      12.6        91       931        98
VIS    2025250    200200   21.8300  142.5700      12.7        91       937        98
VIS    2025250    200200   21.8200  142.5500      12.5        93       937        99
VIS    2025250    200200   21.8300  142.5300      11.9        95       952        93
VIS    2025250    200200   21.8100  142.5200      11.3        94       952        92
VIS    2025250    200200   21.8000  142.4700      10.8        95       975        99
VIS    2025250    200200   21.8100  142.4500      10.1        97       972        98
VIS    2025250    200200   21.8200  142.4400       9.2        99       967        96
VIS    2025250    200200   21.8200  142.4000      10.1       104       947        96
VIS    2025250    200200   21.8900  150.4300       8.4        89       960        92
VIS    2025250    200200   21.8800  150.3900       7.9        88       961        93
VIS    2025250    200200   21.8600  149.5500      11.4        95       946        91
VIS    2025250    200200   21.8600  149.5300      10.9        94       918        93
VIS    2025250    200200   21.8600  149.5200      10.7        96       918        93
VIS    2025250    200200   21.8500  149.5000      11.1        96       923        91
VIS    2025250    200200   21.8600  149.4700      11.3        91       939        92
VIS    2025250    200200   21.8500  149.4200      10.2        87       861        93
VIS    2025250    200200   21.8600  149.4200      10.0        87       856        94
VIS    2025250    200200   21.8700  149.4000       9.0        87       795        90
VIS    2025250    200200   21.8700  149.3300       7.6        87       858        97
VIS    2025250    200200   21.8700  149.3100       7.1        86       866        92
VIS    2025250    200200   21.8500  149.2800       6.8        83       878        91
VIS    2025250    200200   21.8500  149.2600       6.8        80       918        93
VIS    2025250    200200   21.8600  149.2400       7.1        86       932        99
VIS    2025250    200200   21.8700  149.2000       8.4        85       943        99
VIS    2025250    200200   21.8700  149.0900       9.4        82       944        97
VIS    2025250    200200   21.8600  149.0800       9.5        80       944        99
VIS    2025250    200200   21.8700  149.0400       8.9        78       944        98
VIS    2025250    200200   21.8700  149.0400       8.8        78       944        98
VIS    2025250    200200   21.8700  149.0100       8.2        78       948        96
VIS    2025250    200200   21.8500  148.9900       7.8        74       910        93
VIS    2025250    200200   21.8600  148.9400       8.0        81       877        94
VIS    2025250    200200   21.8600  148.9200       8.2        86       877        96
VIS    2025250    200200   21.8500  148.9000       8.4        86       877        96
VIS    2025250    200200   21.8400  148.8600       8.0        88       876        97
VIS    2025250    200200   21.8400  148.8600       8.0        88       876        98
VIS    2025250    200200   21.8500  148.8300       7.9        87       877        99
VIS    2025250    200200   21.8600  148.7900       7.5        86       877        98
VIS    2025250    200200   21.8500  148.7800       7.3        85       878        97
VIS    2025250    200200   21.8500  148.7400       7.5        84       798        92
VIS    2025250    200200   21.8600  148.7300       7.6        83       798        92
VIS    2025250    200200   21.8600  148.6900       7.3        78       800        90
VIS    2025250    200200   21.8500  148.6700       7.3        79       817        90
VIS    2025250    200200   21.8500  148.6300       7.3        76       844        90
VIS    2025250    200200   21.8500  148.6000       8.3        69       920        93
VIS    2025250    200200   21.8400  148.5600       9.2        83       956       100
VIS    2025250    200200   21.8400  148.5400       9.1        83       881        94
VIS    2025250    200200   21.8500  148.5100       8.4        84       860        92
VIS    2025250    200200   21.8600  148.4800       8.0        86       866        95
VIS    2025250    200200   21.8600  148.4800       7.9        86       866        95
VIS    2025250    200200   21.8500  148.4500       7.7        88       886        95
VIS    2025250    200200   21.8400  148.4100       8.1        82       949        99
VIS    2025250    200200   21.8400  148.4000       8.1        82       949        99
VIS    2025250    200200   21.8400  148.3700       8.5        83       903        98
VIS    2025250    200200   21.8500  148.3300       9.7        85       901        97
VIS    2025250    200200   21.8600  148.3200       9.7        86       933        98
VIS    2025250    200200   21.8600  148.2400      11.0        86       975        93
VIS    2025250    200200   21.8500  148.2200       9.8        77       979        99
VIS    2025250    200200   21.8600  148.1800       9.3        88       904        99
VIS    2025250    200200   21.8500  148.1700       9.0        90       904        99
VIS    2025250    200200   21.8500  148.1500       8.5        97       864        94
VIS    2025250    200200   21.8300  148.1100       9.0        99       842        94
VIS    2025250    200200   21.8400  148.0800      10.0       100       859        96
VIS    2025250    200200   21.8500  148.0700       9.8        99       859        96
VIS    2025250    200200   21.8500  148.0400       7.9        91       882        98
VIS    2025250    200200   21.8500  148.0100       6.6        89       877        94
VIS    2025250    200200   21.8500  148.0000       6.2        93       867        94
VIS    2025250    200200   21.8400  147.9600       7.3        79       856        90
VIS    2025250    200200   21.8300  147.9300       8.4        75       880        93
VIS    2025250    200200   21.8400  147.9200       8.1        76       875        93
VIS    2025250    200200   21.8500  147.8700       7.9        81       867        93
VIS    2025250    200200   21.8500  147.8600       8.1        84       866        94
VIS    2025250    200200   21.8400  147.8400       9.3        97       864        97
VIS    2025250    200200   21.8400  147.8100      10.0        94       867        96
VIS    2025250    200200   21.8300  147.7700       9.6        96       874        98
VIS    2025250    200200   21.8300  147.7700       9.9        97       874        97
VIS    2025250    200200   21.8300  147.7200       9.8        95       890        98
VIS    2025250    200200   21.8300  147.7100       9.6        95       891        94
VIS    2025250    200200   21.8400  147.6500       9.3       102       749        91
VIS    2025250    200200   21.8400  147.4900       8.1        99       708        91
VIS    2025250    200200   21.8400  147.4900       8.2       100       709        91
VIS    2025250    200200   21.8500  147.4500       8.9       112       707        94
VIS    2025250    200200   21.8300  147.4300       9.0       104       708        91
VIS    2025250    200200   21.8300  147.3900       9.8        94       815        92
VIS    2025250    200200   21.8200  147.3900       9.9        91       840        92
VIS    2025250    200200   21.8300  147.3400      11.9        87       971        99
VIS    2025250    200200   21.8300  147.3300      12.4        86       972        98
VIS    2025250    200200   21.8400  147.3100      12.5        85       974        98
VIS    2025250    200200   21.8200  146.8300      10.2       101       959        93
VIS    2025250    200200   21.8200  146.8000      11.5        87       957        98
VIS    2025250    200200   21.8200  146.7900      11.6        82       957       100
VIS    2025250    200200   21.8400  146.7500       9.4        82       956        97
VIS    2025250    200200   21.8300  146.6700      11.2        99       777        92
VIS    2025250    200200   21.8100  146.3800      12.6        89       864        90
VIS    2025250    200200   21.8300  146.3500      11.9        94       876        91
VIS    2025250    200200   21.8300  146.3400      11.8        96       901        92
VIS    2025250    200200   21.8200  146.2600      11.8        84       971        92
VIS    2025250    200200   21.8000  143.6800      12.4        86       927        96
VIS    2025250    200200   21.7900  143.6500      13.4        86       915        95
VIS    2025250    200200   21.7900  143.6400      13.7        85       915        95
VIS    2025250    200200   21.7900  143.6200      13.7        85       919        96
VIS    2025250    200200   21.7900  143.5800      13.6        85       925        98
VIS    2025250    200200   21.8000  143.5600      13.3        86       926        99
VIS    2025250    200200   21.7900  143.5300      13.0        87       919        98
VIS    2025250    200200   21.7900  143.5100      12.5        88       920        98
VIS    2025250    200200   21.8000  143.4700      11.4        91       924        99
VIS    2025250    200200   21.8000  143.4500      12.0        90       927        99
VIS    2025250    200200   21.8000  143.4200      12.3        91       939        99
VIS    2025250    200200   21.8000  143.4200      12.3        91       939        99
VIS    2025250    200200   21.7900  143.3800      12.0        90       941        97
VIS    2025250    200200   21.8100  143.3700      12.0        91       940        98
VIS    2025250    200200   21.8000  143.3400      10.3       100       943        94
VIS    2025250    200200   21.8000  143.3000      10.4       102       931        96
VIS    2025250    200200   21.7800  143.2800      12.1        96       937        98
VIS    2025250    200200   21.8100  143.2700      12.3        92       931        97
VIS    2025250    200200   21.7900  143.2300      13.0        91       930        98
VIS    2025250    200200   21.8000  143.2200      12.6        91       929        98
VIS    2025250    200200   21.7800  143.1800      11.4        93       944        99
VIS    2025250    200200   21.7800  143.1700      11.4        93       944        99
VIS    2025250    200200   21.8000  143.1400      12.5        89       944        99
VIS    2025250    200200   21.7900  143.1200      13.4        89       933        98
VIS    2025250    200200   21.7900  143.0800      13.6        93       951        96
VIS    2025250    200200   21.8000  143.0700      13.4        93       955        97
VIS    2025250    200200   21.7900  143.0300      12.5        92       964        95
VIS    2025250    200200   21.8000  143.0100      12.4        91       960        96
VIS    2025250    200200   21.7900  142.9900      12.5        91       958        99
VIS    2025250    200200   21.8000  142.9600      12.4        92       947        99
VIS    2025250    200200   21.8000  142.9500      12.0        93       947        98
VIS    2025250    200200   21.7900  142.9100      10.8       106       950        92
VIS    2025250    200200   21.7800  142.8800      12.3        93       934        99
VIS    2025250    200200   21.7800  142.8700      12.6        91       931        99
VIS    2025250    200200   21.7900  142.8500      11.8        88       930        99
VIS    2025250    200200   21.8000  142.8000      11.0        93       932        97
VIS    2025250    200200   21.8000  142.7900      10.2        97       933        95
VIS    2025250    200200   21.7900  142.7500       9.7        97       930        93
VIS    2025250    200200   21.7800  142.7300      10.0        92       926        97
VIS    2025250    200200   21.7900  142.7200      10.5        92       927       100
VIS    2025250    200200   21.7900  142.6800      11.7        93       928        99
VIS    2025250    200200   21.8000  142.6600      11.6        91       929        99
VIS    2025250    200200   21.8000  142.6400      11.9        90       930        99
VIS    2025250    200200   21.7900  142.6100      12.6        91       931        96
VIS    2025250    200200   21.7900  142.6000      12.7        91       931        96
VIS    2025250    200200   21.7800  142.5800      13.0        93       935        97
VIS    2025250    200200   21.7800  142.5500      13.0        92       946        98
VIS    2025250    200200   21.7900  142.5300      11.8        92       961        97
VIS    2025250    200200   21.7800  142.5000      11.0        95       975        99
VIS    2025250    200200   21.7800  142.4800      11.2        95       966        98
VIS    2025250    200200   21.7900  142.4400      10.5        93       946        98
VIS    2025250    200200   21.8000  142.4300      10.0        93       933        95
VIS    2025250    200200   21.8500  150.4100       7.9        90       954        94
VIS    2025250    200200   21.8500  150.3700       8.3        91       960        92
VIS    2025250    200200   21.8500  150.3700       8.5        91       960        91
VIS    2025250    200200   21.8300  149.6100      11.7        92       979        91
VIS    2025250    200200   21.8300  149.5900      11.8        92       979        90
VIS    2025250    200200   21.8400  149.5100      11.4        96       911        91
VIS    2025250    200200   21.8400  149.4500      11.3        86       889        91
VIS    2025250    200200   21.8300  149.4400      10.7        85       861        92
VIS    2025250    200200   21.8500  149.4200      10.0        86       854        94
VIS    2025250    200200   21.8300  149.3300       7.4        88       814        93
VIS    2025250    200200   21.8400  149.3100       7.0        88       858        92
VIS    2025250    200200   21.8300  149.2900       6.7        85       862        95
VIS    2025250    200200   21.8400  149.2700       6.3        79       878        92
VIS    2025250    200200   21.8400  149.2400       6.1        79       918        93
VIS    2025250    200200   21.8400  149.1900       7.8        86       960        95
VIS    2025250    200200   21.8200  149.0900       8.3        70       971        90
VIS    2025250    200200   21.8200  149.0800       8.2        71       956        92
VIS    2025250    200200   21.8300  149.0700       8.3        78       960        97
VIS    2025250    200200   21.8300  149.0200       7.7        82       936        99
VIS    2025250    200200   21.8300  148.9900       7.6        74       910        95
VIS    2025250    200200   21.8300  148.9900       7.7        72       910        94
VIS    2025250    200200   21.8200  148.9200       8.3        81       878        96
VIS    2025250    200200   21.8300  148.9000       8.2        81       877        96
VIS    2025250    200200   21.8400  148.8700       7.9        85       876        97
VIS    2025250    200200   21.8200  148.8600       7.6        82       880        93
VIS    2025250    200200   21.8300  148.8200       7.8        84       879        98
VIS    2025250    200200   21.8400  148.8100       7.8        85       877        98
VIS    2025250    200200   21.8200  148.7800       7.4        82       879        96
VIS    2025250    200200   21.8300  148.7600       7.1        83       878        96
VIS    2025250    200200   21.8300  148.7200       7.4        83       799        92
VIS    2025250    200200   21.8200  148.6900       7.3        81       801        90
VIS    2025250    200200   21.8300  148.6800       7.4        79       801        90
VIS    2025250    200200   21.8200  148.6400       7.5        86       856        95
VIS    2025250    200200   21.8200  148.6300       7.6        85       857        94
VIS    2025250    200200   21.8200  148.6100       8.1        78       869        91
VIS    2025250    200200   21.8200  148.5600       9.5        81       978        99
VIS    2025250    200200   21.8300  148.5500       9.2        83       956        99
VIS    2025250    200200   21.8300  148.5000       8.2        81       860        92
VIS    2025250    200200   21.8200  148.4800       7.9        81       862        92
VIS    2025250    200200   21.8300  148.4600       7.8        83       874        93
VIS    2025250    200200   21.8300  148.4100       8.2        83       948        98
VIS    2025250    200200   21.8300  148.4000       8.2        82       949        99
VIS    2025250    200200   21.8300  148.3700       8.5        83       903        98
VIS    2025250    200200   21.8100  148.3400       9.2        86       896        96
VIS    2025250    200200   21.8200  148.3200       9.5        86       901        96
VIS    2025250    200200   21.8100  148.2300       7.5        69       938        94
VIS    2025250    200200   21.8100  148.2000       7.8        70       904        95
VIS    2025250    200200   21.8100  148.1800       8.3        81       870        94
VIS    2025250    200200   21.8100  148.1600       8.6        90       862        96
VIS    2025250    200200   21.8100  148.1400       8.9        96       859        97
VIS    2025250    200200   21.8300  148.1200       8.8        99       842        94
VIS    2025250    200200   21.8300  148.0900       9.5        99       844        95
VIS    2025250    200200   21.8300  148.0700       9.2        99       879        98
VIS    2025250    200200   21.8200  148.0400       7.9        89       882        97
VIS    2025250    200200   21.8200  148.0200       7.2        84       882        95
VIS    2025250    200200   21.8200  147.9800       6.8        90       861        95
VIS    2025250    200200   21.8200  147.9600       7.1        82       861        93
VIS    2025250    200200   21.8100  147.9300       8.9        74       880        92
VIS    2025250    200200   21.8100  147.9200       8.8        74       880        93
VIS    2025250    200200   21.8100  147.8800       8.1        89       867        96
VIS    2025250    200200   21.8100  147.8700       8.1        92       867        97
VIS    2025250    200200   21.8200  147.8500       8.4        99       864        95
VIS    2025250    200200   21.8000  147.8100       7.4        86       869        93
VIS    2025250    200200   21.8000  147.7700       7.5        92       882        98
VIS    2025250    200200   21.8100  147.7600       8.6        96       880       100
VIS    2025250    200200   21.8000  147.7300       9.5        96       892        99
VIS    2025250    200200   21.8200  147.7200       9.8        95       892        97
VIS    2025250    200200   21.8000  147.6800       9.2        97       835        93
VIS    2025250    200200   21.8100  147.6500       9.3       103       749        94
VIS    2025250    200200   21.8200  147.6300       9.1       103       708        91
VIS    2025250    200200   21.8000  147.5000       8.8       114       704        90
VIS    2025250    200200   21.8000  147.4900       8.6       113       704        90
VIS    2025250    200200   21.8200  147.4700       8.3       107       707        93
VIS    2025250    200200   21.8100  147.4300       9.2       100       744        93
VIS    2025250    200200   21.8200  147.4000       9.9        93       815        92
VIS    2025250    200200   21.8200  147.3900       9.9        91       840        92
VIS    2025250    200200   21.8000  147.3400      10.3        89       937        98
VIS    2025250    200200   21.8200  147.3300      12.2        87       971        97
VIS    2025250    200200   21.7900  146.8800      11.3        89       977        97
VIS    2025250    200200   21.7900  146.8400       9.4        96       958        93
VIS    2025250    200200   21.7900  146.8200       9.5        92       919        98
VIS    2025250    200200   21.8000  146.7900      10.3        76       930        97
VIS    2025250    200200   21.8000  146.7700      10.9        73       934        96
VIS    2025250    200200   21.7900  146.7500      11.4        72       930        94
VIS    2025250    200200   21.8000  146.6600       9.9       100       757        93
VIS    2025250    200200   21.8000  146.6400      10.1       101       741        93
VIS    2025250    200200   21.8000  146.3400      11.7        99       864        92
VIS    2025250    200200   21.7900  146.3100      11.2        98       942        96
VIS    2025250    200200   21.8100  146.2800      12.6        86       991        99
VIS    2025250    200200   21.8100  146.2800      12.6        86       991        92
VIS    2025250    200200   21.7900  146.2300      11.4        90       879        94
VIS    2025250    200200   21.7800  143.6500      13.7        85       905        91
VIS    2025250    200200   21.7800  143.6100      13.9        84       915        94
VIS    2025250    200200   21.7800  143.6100      13.8        84       919        96
VIS    2025250    200200   21.7800  143.5700      13.6        86       919        97
VIS    2025250    200200   21.7800  143.5400      13.2        87       918        98
VIS    2025250    200200   21.7700  143.5300      12.4        89       917        97
VIS    2025250    200200   21.7800  143.5000      11.9        90       920        97
VIS    2025250    200200   21.7800  143.4800      11.5        91       920        96
VIS    2025250    200200   21.7800  143.4200      11.8        95       957        96
VIS    2025250    200200   21.7800  143.3900      11.5        95       948        96
VIS    2025250    200200   21.7600  143.3600      10.6       102       958        92
VIS    2025250    200200   21.7700  143.3100      10.0       110       941        91
VIS    2025250    200200   21.7700  143.3100      10.2       107       939        92
VIS    2025250    200200   21.7700  143.2600      12.2        94       936        99
VIS    2025250    200200   21.7700  143.2600      12.1        94       932        99
VIS    2025250    200200   21.7600  143.2100      11.6        92       927        97
VIS    2025250    200200   21.7700  143.1900      12.0        91       935        97
VIS    2025250    200200   21.7700  143.1900      11.8        92       944        99
VIS    2025250    200200   21.7800  143.1600      12.1        91       944       100
VIS    2025250    200200   21.7700  143.1200      13.8        88       932        98
VIS    2025250    200200   21.7800  143.1100      13.8        88       933        97
VIS    2025250    200200   21.7600  143.0700      12.7        90       966        98
VIS    2025250    200200   21.7600  143.0600      12.7        90       966        98
VIS    2025250    200200   21.7700  143.0200      12.5        91       958        97
VIS    2025250    200200   21.7600  143.0100      12.3        91       958        98
VIS    2025250    200200   21.7600  142.9800      12.4        90       956        98
VIS    2025250    200200   21.7700  142.9600      12.6        91       956        98
VIS    2025250    200200   21.7700  142.9300      12.6        96       964        97
VIS    2025250    200200   21.7600  142.9100      12.3        98       950        97
VIS    2025250    200200   21.7600  142.8700      13.1        94       929        99
VIS    2025250    200200   21.7600  142.8500      12.3        90       926        97
VIS    2025250    200200   21.7600  142.8400      11.7        88       928        97
VIS    2025250    200200   21.7700  142.8000      10.0        92       932        98
VIS    2025250    200200   21.7600  142.7700      10.8        95       932        99
VIS    2025250    200200   21.7600  142.7600      11.0        95       930        99
VIS    2025250    200200   21.7600  142.7400      10.9        91       928       100
VIS    2025250    200200   21.7700  142.6900      11.5        91       927        99
VIS    2025250    200200   21.7600  142.6700      12.3        92       928        98
VIS    2025250    200200   21.7700  142.6400      12.6        91       929        98
VIS    2025250    200200   21.7800  142.6300      12.7        90       930        98
VIS    2025250    200200   21.7800  142.6200      12.7        90       934        97
VIS    2025250    200200   21.7700  142.5800      13.0        93       935        96
VIS    2025250    200200   21.7700  142.5600      13.0        91       946        98
VIS    2025250    200200   21.7500  142.5400      11.1        91       987        99
VIS    2025250    200200   21.7500  142.5000      10.3        93       965        98
VIS    2025250    200200   21.7700  142.4800      11.0        94       965        98
VIS    2025250    200200   21.7700  142.4700      11.5        95       947        98
VIS    2025250    200200   21.7500  142.4300      12.7        92       933        98
VIS    2025250    200200   21.7700  142.4000      11.4        91       933       100
VIS    2025250    200200   21.8300  150.4200       8.9        88       954        90
VIS    2025250    200200   21.8300  150.3800       8.6        91       949        91
VIS    2025250    200200   21.8200  149.5900      11.8        92       974        90
VIS    2025250    200200   21.8100  149.4600      11.6        87       904        90
VIS    2025250    200200   21.8200  149.4200       9.6        84       838        92
VIS    2025250    200200   21.8000  149.3600       7.3        85       794        90
VIS    2025250    200200   21.8100  149.3300       7.3        87       814        92
VIS    2025250    200200   21.8100  149.3000       7.2        89       857        98
VIS    2025250    200200   21.8000  149.2800       7.0        85       869        97
VIS    2025250    200200   21.8200  149.2600       6.4        82       877        96
VIS    2025250    200200   21.8000  149.1500       9.3        81       990        98
VIS    2025250    200200   21.8000  149.1200       8.2        73       978        91
VIS    2025250    200200   21.8100  149.0900       8.1        72       956        95
VIS    2025250    200200   21.8200  149.0700       8.0        77       923        96
VIS    2025250    200200   21.8200  149.0600       8.0        82       923        98
VIS    2025250    200200   21.7900  149.0200       7.4        80       910        99
VIS    2025250    200200   21.8000  148.9900       7.6        69       888        90
VIS    2025250    200200   21.8000  148.9100       8.2        79       879        96
VIS    2025250    200200   21.8000  148.8800       7.7        78       880        93
VIS    2025250    200200   21.8100  148.8700       7.6        79       880        92
VIS    2025250    200200   21.8100  148.8500       7.6        83       880        92
VIS    2025250    200200   21.7900  148.8100       7.7        81       879        95
VIS    2025250    200200   21.7900  148.8000       7.7        81       879        94
VIS    2025250    200200   21.7900  148.7700       7.2        80       879        94
VIS    2025250    200200   21.8000  148.7400       7.0        80       801        91
VIS    2025250    200200   21.8000  148.7300       7.0        80       801        90
VIS    2025250    200200   21.8100  148.7000       7.2        80       801        90
VIS    2025250    200200   21.8100  148.6400       7.6        85       856        94
VIS    2025250    200200   21.8000  148.6000       8.3        80       869        91
VIS    2025250    200200   21.8100  148.6000       8.5        79       897        95
VIS    2025250    200200   21.8000  148.5700       8.9        83       978        99
VIS    2025250    200200   21.7900  148.5400       9.2        80       978        99
VIS    2025250    200200   21.7900  148.5000       7.9        79       878        93
VIS    2025250    200200   21.7900  148.5000       7.7        81       878        94
VIS    2025250    200200   21.8000  148.4700       7.8        84       874        92
VIS    2025250    200200   21.8100  148.4500       7.7        84       912        97
VIS    2025250    200200   21.7900  148.4000       8.8        86       896        96
VIS    2025250    200200   21.8000  148.4000       9.0        87       896        96
VIS    2025250    200200   21.7900  148.3500       9.1        85       901        97
VIS    2025250    200200   21.7900  148.3000       8.9        83       927        97
VIS    2025250    200200   21.8000  148.2900       9.1        85       946        96
VIS    2025250    200200   21.7800  148.2500       7.1        86       939        98
VIS    2025250    200200   21.7800  148.2300       7.0        83       919        96
VIS    2025250    200200   21.8000  148.2100       7.4        73       892        94
VIS    2025250    200200   21.8000  148.1800       8.2        79       870        93
VIS    2025250    200200   21.8000  148.1500       9.0        94       859        96
VIS    2025250    200200   21.8000  148.1400       9.1        96       859        96
VIS    2025250    200200   21.7800  148.1100       9.3        95       870        96
VIS    2025250    200200   21.8000  148.0700       8.1        90       877        98
VIS    2025250    200200   21.8000  148.0700       8.2        92       877        98
VIS    2025250    200200   21.8000  148.0300       7.6        88       875        97
VIS    2025250    200200   21.7900  148.0000       8.1       100       866       100
VIS    2025250    200200   21.7900  147.9700       7.9        98       874       100
VIS    2025250    200200   21.8000  147.9500       8.2        77       875        90
VIS    2025250    200200   21.8000  147.9300       9.0        75       880        93
VIS    2025250    200200   21.7800  147.9100       8.5        82       872        94
VIS    2025250    200200   21.8000  147.8800       8.1        90       867        96
VIS    2025250    200200   21.7900  147.8600       7.7        94       857        96
VIS    2025250    200200   21.8000  147.7800       7.1        89       885        94
VIS    2025250    200200   21.7900  147.7400       8.7        97       890        97
VIS    2025250    200200   21.8000  147.7300       9.2        97       892        98
VIS    2025250    200200   21.7800  147.7000       9.4        95       860        97
VIS    2025250    200200   21.7800  147.6800       9.3        92       835        93
VIS    2025250    200200   21.8000  147.5500       8.8       114       704        94
VIS    2025250    200200   21.7900  147.5300       9.6       119       704        94
VIS    2025250    200200   21.8000  147.5000       9.1       117       704        91
VIS    2025250    200200   21.7800  147.4600       8.7       111       706        93
VIS    2025250    200200   21.7800  147.4500       8.6       108       707        93
VIS    2025250    200200   21.7900  147.4200       9.1        96       769        93
VIS    2025250    200200   21.7900  147.4000       9.2        93       811        93
VIS    2025250    200200   21.7800  147.3800       8.8        92       815        93
VIS    2025250    200200   21.7900  147.3400       9.9        90       937        96
VIS    2025250    200200   21.7900  147.3300      10.4        88       940        94
VIS    2025250    200200   21.7900  146.8900      11.7        87       976        97
VIS    2025250    200200   21.7700  146.8500       9.4        85       960        96
VIS    2025250    200200   21.7700  146.8100       9.5        85       843        91
VIS    2025250    200200   21.7700  146.8100       9.4        82       843        90
VIS    2025250    200200   21.7700  146.7000       9.6        91       785        90
VIS    2025250    200200   21.7700  146.6600       9.0        99       738        93
VIS    2025250    200200   21.7900  146.6400       9.8       104       740        94
VIS    2025250    200200   21.7800  146.6300       9.9       105       741        94
VIS    2025250    200200   21.7800  146.6000      10.0        94       752        91
VIS    2025250    200200   21.7800  146.3200      11.2        98       939        96
VIS    2025250    200200   21.7700  146.2900      10.9       100       944        94
VIS    2025250    200200   21.7700  146.2600      11.7        98       833        90
VIS    2025250    200200   21.7700  146.2400      12.3        92       873        91
VIS    2025250    200200   21.7600  143.5600      13.5        86       910        94
VIS    2025250    200200   21.7500  143.4700      10.6       102       927        97
VIS    2025250    200200   21.7300  143.3900      11.3       100       935        97
VIS    2025250    200200   21.7400  143.3900      11.2       102       957        95
VIS    2025250    200200   21.7500  143.3600      10.6       103       958        93
VIS    2025250    200200   21.7400  143.3300      11.2       101       957        95
VIS    2025250    200200   21.7400  143.3100      12.5        92       952        99
VIS    2025250    200200   21.7300  143.2700      12.1        90       932       100
VIS    2025250    200200   21.7400  143.2400      11.3        93       927       100
VIS    2025250    200200   21.7500  143.2200      11.4        93       927        97
VIS    2025250    200200   21.7400  143.1900      12.8        90       927        97
VIS    2025250    200200   21.7400  143.1900      12.9        90       930        97
VIS    2025250    200200   21.7400  143.1500      14.3        91       935        97
VIS    2025250    200200   21.7400  143.1300      14.3        91       935        97
VIS    2025250    200200   21.7300  143.0900      13.4        90       971        99
VIS    2025250    200200   21.7300  143.0700      13.1        90       972        99
VIS    2025250    200200   21.7400  143.0500      12.8        90       972        99
VIS    2025250    200200   21.7500  143.0200      12.4        90       956        98
VIS    2025250    200200   21.7500  143.0100      12.3        90       956        98
VIS    2025250    200200   21.7500  142.9900      12.4        90       956        98
VIS    2025250    200200   21.7500  142.9600      12.8        90       956        98
VIS    2025250    200200   21.7500  142.9200      12.8        94       955        98
VIS    2025250    200200   21.7500  142.9100      12.6        96       950        98
VIS    2025250    200200   21.7500  142.8700      13.1        94       930        98
VIS    2025250    200200   21.7500  142.8600      13.3        93       929        98
VIS    2025250    200200   21.7500  142.8200      11.3        89       932        97
VIS    2025250    200200   21.7300  142.8000      11.1        92       932        99
VIS    2025250    200200   21.7500  142.7800      11.1        93       932        99
VIS    2025250    200200   21.7400  142.7700      11.6        93       932       100
VIS    2025250    200200   21.7300  142.7300      12.2        90       929        99
VIS    2025250    200200   21.7300  142.7200      12.3        90       929        99
VIS    2025250    200200   21.7300  142.6900      12.4        91       929        97
VIS    2025250    200200   21.7400  142.6500      11.6        91       935        98
VIS    2025250    200200   21.7400  142.6400      11.6        91       936        99
VIS    2025250    200200   21.7400  142.6200      11.5        91       961        98
VIS    2025250    200200   21.7400  142.5900      11.6        91       990        98
VIS    2025250    200200   21.7400  142.5600      11.1        91       992        99
VIS    2025250    200200   21.7300  142.5300      10.4        91       963        97
VIS    2025250    200200   21.7500  142.5000      10.1        92       963        98
VIS    2025250    200200   21.7500  142.5000      10.1        92       963        98
VIS    2025250    200200   21.7300  142.4700      11.7        83       936        99
VIS    2025250    200200   21.7300  142.4300      13.1        96       938        96
VIS    2025250    200200   21.7400  142.4100      12.4        95       937        99
VIS    2025250    200200   21.7800  149.5200      11.8        87       939        91
VIS    2025250    200200   21.8000  149.4800      11.9        90       906        90
VIS    2025250    200200   21.8000  149.4500      11.3        88       904        91
VIS    2025250    200200   21.7800  149.4400      10.1        84       858        92
VIS    2025250    200200   21.7700  149.3200       7.5        83       862        94
VIS    2025250    200200   21.7800  149.2700       7.4        84       902        97
VIS    2025250    200200   21.7800  149.1800       8.4        79       984        90
VIS    2025250    200200   21.7900  149.1500       9.3        81       990        97
VIS    2025250    200200   21.7900  149.1000       8.1        73       947        96
VIS    2025250    200200   21.7800  149.0800       8.1        79       910        97
VIS    2025250    200200   21.7700  149.0600       8.4        87       910        99
VIS    2025250    200200   21.7900  149.0300       7.7        84       914        99
VIS    2025250    200200   21.7900  149.0200       7.4        80       902        98
VIS    2025250    200200   21.7700  148.9400       7.7        79       881        96
VIS    2025250    200200   21.7900  148.9200       8.1        81       880        96
VIS    2025250    200200   21.7900  148.9000       8.0        81       880        95
VIS    2025250    200200   21.7900  148.8900       7.8        80       882        91
VIS    2025250    200200   21.7700  148.8600       7.7        80       883        93
VIS    2025250    200200   21.7700  148.8200       8.0        83       881        97
VIS    2025250    200200   21.7800  148.8000       7.9        81       880        95
VIS    2025250    200200   21.7900  148.7800       7.4        80       879        94
VIS    2025250    200200   21.7800  148.7500       7.3        79       879        95
VIS    2025250    200200   21.7700  148.6700       7.3        78       812        90
VIS    2025250    200200   21.7700  148.6400       7.3        79       829        91
VIS    2025250    200200   21.7800  148.6300       7.4        80       853        92
VIS    2025250    200200   21.7700  148.5900       8.0        84       872        95
VIS    2025250    200200   21.7700  148.5800       8.1        85       872        96
VIS    2025250    200200   21.7800  148.5400       9.0        79       970        99
VIS    2025250    200200   21.7800  148.5300       9.0        79       923        99
VIS    2025250    200200   21.7800  148.5100       8.0        78       881        93
VIS    2025250    200200   21.7700  148.4600       7.6        86       905        99
VIS    2025250    200200   21.7700  148.4400       7.8        83       912        99
VIS    2025250    200200   21.7600  148.4200       8.0        81       912        99
VIS    2025250    200200   21.7800  148.4000       8.7        86       897        96
VIS    2025250    200200   21.7800  148.3700       9.3        86       901        95
VIS    2025250    200200   21.7800  148.3500       9.0        85       901        98
VIS    2025250    200200   21.7600  148.3100       8.8        81       940       100
VIS    2025250    200200   21.7600  148.3000       8.8        80       953       100
VIS    2025250    200200   21.7600  148.2700       7.9        84       956        99
VIS    2025250    200200   21.7800  148.2500       7.1        85       939        98
VIS    2025250    200200   21.7800  148.2200       7.2        84       894        97
VIS    2025250    200200   21.7800  148.1800       8.7        87       867        96
VIS    2025250    200200   21.7600  148.1800       9.1        91       872        98
VIS    2025250    200200   21.7600  148.1300       9.0        95       877        98
VIS    2025250    200200   21.7800  148.1300       9.8        98       862        94
VIS    2025250    200200   21.7700  148.0800       8.5        88       877        98
VIS    2025250    200200   21.7700  148.0600       8.1        85       877        97
VIS    2025250    200200   21.7600  148.0300       7.7        90       875        98
VIS    2025250    200200   21.7700  148.0200       7.7        94       874        99
VIS    2025250    200200   21.7600  147.9800       7.3        90       877        96
VIS    2025250    200200   21.7600  147.9700       7.4        85       877        96
VIS    2025250    200200   21.7700  147.9300       8.5        78       874        93
VIS    2025250    200200   21.7600  147.9100       8.1        83       864        93
VIS    2025250    200200   21.7600  147.8800       8.0        96       856        96
VIS    2025250    200200   21.7500  147.8600       7.3       103       857        98
VIS    2025250    200200   21.7700  147.8300       6.9        81       859        90
VIS    2025250    200200   21.7700  147.7700       7.6        87       897        92
VIS    2025250    200200   21.7600  147.7300       9.0        96       780        93
VIS    2025250    200200   21.7500  147.7000       8.4        90       770        92
VIS    2025250    200200   21.7500  147.6800       8.0        81       803        90
VIS    2025250    200200   21.7700  147.5500       9.4       115       705        94
VIS    2025250    200200   21.7600  147.5300       9.3       118       705        95
VIS    2025250    200200   21.7600  147.5000       9.3       117       706        93
VIS    2025250    200200   21.7600  147.4900       9.1       116       705        93
VIS    2025250    200200   21.7600  147.4500       8.8       106       707        93
VIS    2025250    200200   21.7600  147.4400       8.9       106       707        92
VIS    2025250    200200   21.7600  147.4000       7.9       100       769        94
VIS    2025250    200200   21.7600  147.3900       7.9        95       803        94
VIS    2025250    200200   21.7600  147.3700       8.3        92       811        94
VIS    2025250    200200   21.7700  147.3300       8.8        90       924        94
VIS    2025250    200200   21.7600  146.9500      11.9        84       989        98
VIS    2025250    200200   21.7400  146.8500      10.3        82       942        97
VIS    2025250    200200   21.7500  146.8400       9.9        86       919        98
VIS    2025250    200200   21.7600  146.7300       8.5        92       792        90
VIS    2025250    200200   21.7600  146.7100       9.4        92       763        90
VIS    2025250    200200   21.7400  146.6900       8.9        96       734        95
VIS    2025250    200200   21.7400  146.6500       8.3       101       714        97
VIS    2025250    200200   21.7400  146.6300       9.0       106       719        98
VIS    2025250    200200   21.7400  146.6000       9.6       101       757        96
VIS    2025250    200200   21.7600  146.5800       9.4        92       757        91
VIS    2025250    200200   21.7400  146.4900      11.3        89       810        90
VIS    2025250    200200   21.7500  146.3600       9.8        93       868        93
VIS    2025250    200200   21.7400  146.3200       9.8        97       916        96
VIS    2025250    200200   21.7400  146.3100      10.0        97       916        95
VIS    2025250    200200   21.7400  146.2700      11.8        98       794        90
VIS    2025250    200200   21.7400  146.2600      11.3        99       794        92
VIS    2025250    200200   21.7400  145.4400       9.7        93       701        91
VIS    2025250    200200   21.7100  143.4000      11.7        95       919        99
VIS    2025250    200200   21.7100  143.3700      12.0        93       935        97
VIS    2025250    200200   21.7100  143.3300      13.7        90       940        99
VIS    2025250    200200   21.7200  143.3200      13.4        90       952        99
VIS    2025250    200200   21.7100  143.2800      13.2        87       926        98
VIS    2025250    200200   21.7100  143.2700      12.5        87       926        99
VIS    2025250    200200   21.7200  143.2300      11.3        92       926        99
VIS    2025250    200200   21.7300  143.2000      12.2        91       927        98
VIS    2025250    200200   21.7300  143.2000      12.4        90       927        98
VIS    2025250    200200   21.7200  143.1600      13.5        89       936        98
VIS    2025250    200200   21.7100  143.1300      13.1        90       947        99
VIS    2025250    200200   21.7100  143.1200      13.0        90       947        99
VIS    2025250    200200   21.7100  143.0900      12.9        91       967        99
VIS    2025250    200200   21.7100  143.0500      13.3        89       979        99
VIS    2025250    200200   21.7100  143.0500      13.2        89       979        99
VIS    2025250    200200   21.7300  143.0200      13.1        89       974        99
VIS    2025250    200200   21.7300  143.0000      12.9        87       974        99
VIS    2025250    200200   21.7100  142.9600      12.5        86       945        99
VIS    2025250    200200   21.7300  142.9500      12.4        89       950        96
VIS    2025250    200200   21.7100  142.9200      12.5        91       937        94
VIS    2025250    200200   21.7300  142.8800      14.3        93       933        97
VIS    2025250    200200   21.7200  142.8800      14.5        93       933        97
VIS    2025250    200200   21.7200  142.8500      13.0        93       932        97
VIS    2025250    200200   21.7300  142.8100      11.5        91       932        99
VIS    2025250    200200   21.7300  142.7800      11.0        93       932        99
VIS    2025250    200200   21.7300  142.7600      11.6        93       932       100
VIS    2025250    200200   21.7300  142.7300      12.2        90       929        98
VIS    2025250    200200   21.7200  142.7200      12.3        90       929        98
VIS    2025250    200200   21.7200  142.7000      12.4        90       929        97
VIS    2025250    200200   21.7200  142.6600      11.6        90       935        98
VIS    2025250    200200   21.7200  142.6500      11.4        91       938        98
VIS    2025250    200200   21.7200  142.6300      10.9        91       961        98
VIS    2025250    200200   21.7200  142.6000      11.1        91       990        99
VIS    2025250    200200   21.7200  142.5700      11.0        89       977        99
VIS    2025250    200200   21.7000  142.5300      10.8        90       938        99
VIS    2025250    200200   21.7100  142.5300      10.5        90       938        97
VIS    2025250    200200   21.7200  142.5000       9.6        90       937        97
VIS    2025250    200200   21.7000  142.4600      13.5        88       936        98
VIS    2025250    200200   21.7000  142.4500      13.6        90       937        98
VIS    2025250    200200   21.7100  142.4100      13.3        98       940        95
VIS    2025250    200200   21.7600  149.5200      11.3        86       947        90
VIS    2025250    200200   21.7700  149.5100      11.3        86       939        91
VIS    2025250    200200   21.7500  149.4600      10.4        88       912        94
VIS    2025250    200200   21.7600  149.4500      10.1        86       875        94
VIS    2025250    200200   21.7500  149.3900       7.8        81       800        90
VIS    2025250    200200   21.7600  149.3600       6.9        82       844        93
VIS    2025250    200200   21.7700  149.3600       6.8        82       844        92
VIS    2025250    200200   21.7700  149.3000       7.9        86       875        93
VIS    2025250    200200   21.7600  149.2800       7.7        86       911        91
VIS    2025250    200200   21.7600  149.1700       7.4        81      1000        90
VIS    2025250    200200   21.7500  149.1300       7.2        69       962        95
VIS    2025250    200200   21.7600  149.1100       7.6        70       916        93
VIS    2025250    200200   21.7600  149.1000       7.8        71       916        94
VIS    2025250    200200   21.7500  149.0700       8.2        85       905        99
VIS    2025250    200200   21.7400  149.0300       7.7        83       908       100
VIS    2025250    200200   21.7400  149.0100       7.5        72       886        94
VIS    2025250    200200   21.7600  149.0000       7.2        74       885        94
VIS    2025250    200200   21.7500  148.9400       7.7        80       882        94
VIS    2025250    200200   21.7600  148.9300       8.0        86       882        96
VIS    2025250    200200   21.7400  148.8900       8.0        92       887        98
VIS    2025250    200200   21.7600  148.8600       7.7        81       883        96
VIS    2025250    200200   21.7500  148.8500       7.8        82       884        98
VIS    2025250    200200   21.7500  148.8100       8.1        83       885        98
VIS    2025250    200200   21.7600  148.7800       8.1        81       880        96
VIS    2025250    200200   21.7600  148.7600       7.9        80       880        96
VIS    2025250    200200   21.7600  148.7400       7.6        78       880        95
VIS    2025250    200200   21.7400  148.7200       7.9        82       811        92
VIS    2025250    200200   21.7400  148.6200       7.7        80       858        97
VIS    2025250    200200   21.7400  148.5800       7.9        78       868        97
VIS    2025250    200200   21.7500  148.5700       8.2        81       942        99
VIS    2025250    200200   21.7600  148.5100       8.5        78       915        96
VIS    2025250    200200   21.7500  148.4900       7.9        79       906        95
VIS    2025250    200200   21.7400  148.4600       7.4        80       895        97
VIS    2025250    200200   21.7600  148.4200       8.0        80       912        99
VIS    2025250    200200   21.7400  148.4100       8.6        80       951       100
VIS    2025250    200200   21.7400  148.3900       9.3        81       950       100
VIS    2025250    200200   21.7500  148.3500       9.0        80       918        98
VIS    2025250    200200   21.7500  148.3300       8.6        79       916        98
VIS    2025250    200200   21.7500  148.3100       8.8        81       940       100
VIS    2025250    200200   21.7300  148.2700       8.2        83       956        99
VIS    2025250    200200   21.7300  148.2400       7.7        82       916        98
VIS    2025250    200200   21.7400  148.2400       7.7        84       916        97
VIS    2025250    200200   21.7300  148.2000       9.4        84       903       100
VIS    2025250    200200   21.7500  148.1700       8.9        90       890       100
VIS    2025250    200200   21.7500  148.1600       8.6        91       890       100
VIS    2025250    200200   21.7400  148.1400       8.1        88       890        99
VIS    2025250    200200   21.7400  148.1000       8.6        88       879        98
VIS    2025250    200200   21.7400  148.0700       8.9        86       885        98
VIS    2025250    200200   21.7300  148.0400       8.5        87       904        98
VIS    2025250    200200   21.7300  148.0400       8.3        88       915        96
VIS    2025250    200200   21.7500  148.0100       7.3        94       885        98
VIS    2025250    200200   21.7500  147.9700       7.3        83       875        95
VIS    2025250    200200   21.7500  147.9600       7.2        79       875        93
VIS    2025250    200200   21.7300  147.9300       7.1        78       862        93
VIS    2025250    200200   21.7400  147.9000       7.6        82       862        96
VIS    2025250    200200   21.7300  147.8700       7.9        93       867        97
VIS    2025250    200200   21.7400  147.8400       7.2        97       880        90
VIS    2025250    200200   21.7500  147.8400       6.9        92       880        94
VIS    2025250    200200   21.7300  147.7900       8.5        86       885        96
VIS    2025250    200200   21.7400  147.7800       8.7        85       890        97
VIS    2025250    200200   21.7300  147.7400       8.8       101       735        96
VIS    2025250    200200   21.7300  147.7100       8.2        92       734        94
VIS    2025250    200200   21.7400  147.7000       8.2        90       739        94
VIS    2025250    200200   21.7300  147.5900       9.1       108       768        99
VIS    2025250    200200   21.7400  147.5700       9.3       112       740        95
VIS    2025250    200200   21.7400  147.5400       9.2       116       706        95
VIS    2025250    200200   21.7400  147.5200       9.1       116       705        95
VIS    2025250    200200   21.7300  147.5100       9.1       117       705        95
VIS    2025250    200200   21.7300  147.4800       9.2       115       705        93
VIS    2025250    200200   21.7200  147.4500       8.7       106       707        94
VIS    2025250    200200   21.7300  147.4100       8.9       104       733        95
VIS    2025250    200200   21.7400  147.3900       7.9        98       770        95
VIS    2025250    200200   21.7400  147.3800       8.0        95       793        95
VIS    2025250    200200   21.7200  147.3500       8.9        93       811        96
VIS    2025250    200200   21.7300  147.3200       8.4        92       828        97
VIS    2025250    200200   21.7200  147.2800       9.7        83       959        97
VIS    2025250    200200   21.7200  147.2600      11.3        85       997        91
VIS    2025250    200200   21.7200  146.9500      13.3        83       995        98
VIS    2025250    200200   21.7200  146.8700      11.0        82       959        95
VIS    2025250    200200   21.7300  146.8600      10.9        80       942        96
VIS    2025250    200200   21.7400  146.8000       9.8        88       739        90
VIS    2025250    200200   21.7300  146.7900       9.5        89       738        91
VIS    2025250    200200   21.7200  146.7400       9.5        92       734        91
VIS    2025250    200200   21.7300  146.7400       8.4        91       734        92
VIS    2025250    200200   21.7200  146.6900       9.3        94       745        93
VIS    2025250    200200   21.7100  146.6700       9.8       101       725        96
VIS    2025250    200200   21.7300  146.6500       8.4       101       714        97
VIS    2025250    200200   21.7300  146.6300       8.5       104       701        97
VIS    2025250    200200   21.7100  146.5500       8.4        98       707        96
VIS    2025250    200200   21.7100  146.5200       8.3       100       730        96
VIS    2025250    200200   21.7300  146.4900      10.3        90       762        90
VIS    2025250    200200   21.7200  146.3800      10.0        94       798        90
VIS    2025250    200200   21.7100  146.3600       9.2        96       909        93
VIS    2025250    200200   21.7300  146.3300       8.8        93       916        92
VIS    2025250    200200   21.7100  146.3100      10.7        98       770        90
VIS    2025250    200200   21.7100  146.2500      12.2        92       758        90
VIS    2025250    200200   21.7200  146.0700      10.2        88       825        90
VIS    2025250    200200   21.7100  145.6400      11.0       101       728        95
VIS    2025250    200200   21.7100  145.6100      10.9        97       728        92
VIS    2025250    200200   21.7000  145.4500      10.7       102       703        96
VIS    2025250    200200   21.6800  143.3800      12.3        89       919        97
VIS    2025250    200200   21.6800  143.3600      12.2        89       919        94
VIS    2025250    200200   21.6800  143.3200      13.9        89       920        97
VIS    2025250    200200   21.7000  143.3000      13.9        86       928        98
VIS    2025250    200200   21.7000  143.2800      13.4        85       924        97
VIS    2025250    200200   21.7000  143.2700      13.0        86       925        98
VIS    2025250    200200   21.6800  143.2300      11.8        90       924       100
VIS    2025250    200200   21.7000  143.2100      11.9        92       926        99
VIS    2025250    200200   21.6900  143.1800      12.3        93       928        99
VIS    2025250    200200   21.6900  143.1600      13.1        89       933        99
VIS    2025250    200200   21.7000  143.1300      13.0        89       947        99
VIS    2025250    200200   21.7000  143.1100      12.8        91       953        99
VIS    2025250    200200   21.6900  143.0900      12.9        90       959        99
VIS    2025250    200200   21.7000  143.0600      13.4        89       979        99
VIS    2025250    200200   21.6800  143.0300      14.3        88       979        98
VIS    2025250    200200   21.6900  143.0200      14.3        88       977        99
VIS    2025250    200200   21.6900  143.0000      13.6        85       970        99
VIS    2025250    200200   21.6800  142.9500      12.8        88       939        98
VIS    2025250    200200   21.6800  142.9500      12.9        88       939        98
VIS    2025250    200200   21.7000  142.9100      13.0        89       936        96
VIS    2025250    200200   21.7000  142.9000      14.1        89       936        96
VIS    2025250    200200   21.6900  142.8600      13.8        92       942        98
VIS    2025250    200200   21.6900  142.8300      11.8        91       934        95
VIS    2025250    200200   21.6900  142.8100      11.4        90       932        93
VIS    2025250    200200   21.6800  142.7800      13.2        93       930        97
VIS    2025250    200200   21.6900  142.7700      11.7        94       930       100
VIS    2025250    200200   21.6900  142.7400      11.4        94       929        99
VIS    2025250    200200   21.6800  142.7200      11.3        95       924        99
VIS    2025250    200200   21.6900  142.6900      11.7        91       933        98
VIS    2025250    200200   21.6800  142.6600      12.2        90       950        99
VIS    2025250    200200   21.6800  142.6500      12.3        90       950        99
VIS    2025250    200200   21.6800  142.6200      12.0        90       952        99
VIS    2025250    200200   21.6800  142.5900      12.0        90       948        99
VIS    2025250    200200   21.6900  142.5600      11.8        90       946       100
VIS    2025250    200200   21.6900  142.5300      11.3        90       937        99
VIS    2025250    200200   21.6800  142.5200      12.1        90       934        99
VIS    2025250    200200   21.6800  142.4900      12.2        91       932        99
VIS    2025250    200200   21.7000  142.4600      13.3        89       933        98
VIS    2025250    200200   21.6900  142.4500      12.9        92       938        99
VIS    2025250    200200   21.7500  149.4900      10.7        87       944        94
VIS    2025250    200200   21.7400  149.4600      10.2        87       912        94
VIS    2025250    200200   21.7400  149.4500      10.0        86       879        94
VIS    2025250    200200   21.7200  149.4200       8.8        86       879        98
VIS    2025250    200200   21.7400  149.4100       8.5        83       809        90
VIS    2025250    200200   21.7400  149.3600       6.9        78       878        93
VIS    2025250    200200   21.7200  149.3400       7.1        78       915        96
VIS    2025250    200200   21.7200  149.1600       6.5        71       962        96
VIS    2025250    200200   21.7300  149.1400       6.7        72       940        98
VIS    2025250    200200   21.7200  149.1200       6.5        79       912        99
VIS    2025250    200200   21.7200  149.0800       7.9        89       898        98
VIS    2025250    200200   21.7400  149.0800       8.1        86       898        98
VIS    2025250    200200   21.7400  149.0300       7.7        81       908       100
VIS    2025250    200200   21.7400  149.0000       7.9        65       883        92
VIS    2025250    200200   21.7400  148.9400       7.5        77       887        95
VIS    2025250    200200   21.7300  148.9200       7.9        90       889        99
VIS    2025250    200200   21.7300  148.8900       8.1        92       889        98
VIS    2025250    200200   21.7200  148.8700       8.1        87       889        98
VIS    2025250    200200   21.7300  148.8400       7.7        83       887        99
VIS    2025250    200200   21.7200  148.8000       8.2        84       886        98
VIS    2025250    200200   21.7200  148.7900       8.3        83       886        98
VIS    2025250    200200   21.7300  148.7600       8.3        83       886        98
VIS    2025250    200200   21.7200  148.7300       8.0        82       815        94
VIS    2025250    200200   21.7200  148.7000       7.5        82       815        92
VIS    2025250    200200   21.7200  148.6900       7.2        81       816        93
VIS    2025250    200200   21.7300  148.6600       7.1        79       826        92
VIS    2025250    200200   21.7100  148.6300       7.4        79       860        96
VIS    2025250    200200   21.7100  148.6000       7.6        70       868        93
VIS    2025250    200200   21.7200  148.5800       7.8        73       874        95
VIS    2025250    200200   21.7200  148.5600       8.6        77       927        97
VIS    2025250    200200   21.7300  148.4600       7.5        79       895        96
VIS    2025250    200200   21.7100  148.4200       8.5        81       974        99
VIS    2025250    200200   21.7100  148.3900       9.3        81       962       100
VIS    2025250    200200   21.7200  148.3700       9.8        80       951       100
VIS    2025250    200200   21.7100  148.3500       9.5        83       937       100
VIS    2025250    200200   21.7100  148.3400       9.1        83       937       100
VIS    2025250    200200   21.7200  148.2900       8.1        83       940        99
VIS    2025250    200200   21.7300  148.2800       8.3        83       962        99
VIS    2025250    200200   21.7300  148.2400       7.8        82       916        96
VIS    2025250    200200   21.7300  148.2200       8.6        82       903        98
VIS    2025250    200200   21.7300  148.2100       8.8        82       903        99
VIS    2025250    200200   21.7100  148.1600       8.6        83       922        98
VIS    2025250    200200   21.7100  148.1500       7.6        84       919        95
VIS    2025250    200200   21.7200  148.1400       7.4        83       909        96
VIS    2025250    200200   21.7100  148.1000       8.4        85       889        98
VIS    2025250    200200   21.7100  148.0700       9.0        88       897        99
VIS    2025250    200200   21.7300  148.0400       8.6        87       915        96
VIS    2025250    200200   21.7300  148.0400       8.5        89       915        96
VIS    2025250    200200   21.7200  148.0000       8.3        93       902        97
VIS    2025250    200200   21.7200  147.9600       7.6        82       867        96
VIS    2025250    200200   21.7200  147.9600       7.4        81       867        96
VIS    2025250    200200   21.7000  147.9100       7.1        77       858        92
VIS    2025250    200200   21.7000  147.9100       7.3        78       858        93
VIS    2025250    200200   21.7200  147.8700       8.0        92       885        96
VIS    2025250    200200   21.7100  147.8200       6.9        96       875        91
VIS    2025250    200200   21.7200  147.8000       7.7        90       875        96
VIS    2025250    200200   21.7100  147.7700       8.6       113       778        96
VIS    2025250    200200   21.7000  147.7400       7.8       104       723        98
VIS    2025250    200200   21.7100  147.7300       7.8       103       723        98
VIS    2025250    200200   21.7200  147.6900       7.8        91       737        93
VIS    2025250    200200   21.7200  147.6200       8.0       108       805        98
VIS    2025250    200200   21.7200  147.5900       9.3       110       808       100
VIS    2025250    200200   21.7000  147.5700       9.3       101       834       100
VIS    2025250    200200   21.7200  147.5500       8.8       108       749        98
VIS    2025250    200200   21.7200  147.5100       9.0       118       706        95
VIS    2025250    200200   21.7100  147.5000       8.9       117       706        95
VIS    2025250    200200   21.7200  147.4700       8.9       112       705        94
VIS    2025250    200200   21.7000  147.4400       9.2        99       709        92
VIS    2025250    200200   21.7100  147.4300       9.3       101       711        93
VIS    2025250    200200   21.7100  147.3800       9.2        91       744        93
VIS    2025250    200200   21.7000  147.3700       9.5        88       793        93
VIS    2025250    200200   21.7100  147.3400       9.4        90       816        95
VIS    2025250    200200   21.7100  147.3100       9.3        88       828        95
VIS    2025250    200200   21.7000  147.2800       9.9        85       923        99
VIS    2025250    200200   21.7000  147.2700      10.2        85       943        97
VIS    2025250    200200   21.7000  147.2500      10.1        84       986        94
VIS    2025250    200200   21.7100  146.9100      12.2        82       979        99
VIS    2025250    200200   21.7000  146.8900      11.8        82       965        98
VIS    2025250    200200   21.6900  146.8600      10.7        81       951        93
VIS    2025250    200200   21.6900  146.8600      10.5        81       940        94
VIS    2025250    200200   21.7100  146.7400       9.6        90       734        92
VIS    2025250    200200   21.7000  146.7300       9.6        90       734        91
VIS    2025250    200200   21.6900  146.6900       9.5        92       740        92
VIS    2025250    200200   21.6900  146.6800       9.6        94       740        93
VIS    2025250    200200   21.6900  146.6400       8.7        96       701        92
VIS    2025250    200200   21.6900  146.5500       7.9        97       711        96
VIS    2025250    200200   21.7000  146.5100       8.0        98       727        96
VIS    2025250    200200   21.7000  146.5100       8.2        98       727        96
VIS    2025250    200200   21.6900  146.4600      10.1        98       727        90
VIS    2025250    200200   21.7000  146.4200      11.2        95       771        92
VIS    2025250    200200   21.6900  146.3900       9.9       100       807        92
VIS    2025250    200200   21.7100  146.3700       9.5        99       872        96
VIS    2025250    200200   21.6900  146.3300       9.9        99       928        94
VIS    2025250    200200   21.7000  146.3200      10.4        98       771        94
VIS    2025250    200200   21.6900  145.9600      11.8       102       764        95
VIS    2025250    200200   21.6900  145.6600      10.6       111       704       100
VIS    2025250    200200   21.6900  145.6400      11.1       100       723        95
VIS    2025250    200200   21.7000  145.6200      11.3        94       728        91
VIS    2025250    200200   21.6800  145.5900      11.7        92       739        92
VIS    2025250    200200   21.6900  145.5700      11.8        93       729        91
VIS    2025250    200200   21.7000  145.4700      13.1        96       712        90
VIS    2025250    200200   21.6800  145.4300       9.0       104       700        97
VIS    2025250    200200   21.6900  145.4300       9.0       105       702        96
VIS    2025250    200200   21.6600  143.4000      13.3        89       914        97
VIS    2025250    200200   21.6600  143.3900      12.9        90       913        97
VIS    2025250    200200   21.6700  143.3600      12.3        89       916        94
VIS    2025250    200200   21.6800  143.3300      13.4        89       917        96
VIS    2025250    200200   21.6700  143.3100      14.0        88       916        95
VIS    2025250    200200   21.6600  143.2700      13.3        86       921        98
VIS    2025250    200200   21.6600  143.2600      13.2        86       921        98
VIS    2025250    200200   21.6700  143.2200      12.3        92       924        99
VIS    2025250    200200   21.6800  143.2000      12.2        95       924        99
VIS    2025250    200200   21.6800  143.1900      12.3        95       925        99
VIS    2025250    200200   21.6800  143.1500      13.4        89       928        98
VIS    2025250    200200   21.6600  143.1200      13.2        88       932        97
VIS    2025250    200200   21.6600  143.0900      13.2        88       949        99
VIS    2025250    200200   21.6600  143.0800      13.1        88       953        99
VIS    2025250    200200   21.6600  143.0500      13.7        88       974        99
VIS    2025250    200200   21.6800  143.0200      14.3        88       977        98
VIS    2025250    200200   21.6600  143.0100      13.8        88       961        99
VIS    2025250    200200   21.6600  142.9900      13.2        87       950        98
VIS    2025250    200200   21.6600  142.9600      12.9        87       949        99
VIS    2025250    200200   21.6600  142.9200      13.1        87       945        99
VIS    2025250    200200   21.6600  142.9200      13.2        87       945        99
VIS    2025250    200200   21.6600  142.8700      14.2        87       947        98
VIS    2025250    200200   21.6500  142.8600      13.7        88       947        99
VIS    2025250    200200   21.6600  142.8300      12.5        89       942        99
VIS    2025250    200200   21.6500  142.8200      12.6        89       933        99
VIS    2025250    200200   21.6700  142.7800      13.8        93       930        96
VIS    2025250    200200   21.6600  142.7600      13.5        99       920        94
VIS    2025250    200200   21.6600  142.7400      12.0        99       921        98
VIS    2025250    200200   21.6600  142.7000      11.1        93       933        99
VIS    2025250    200200   21.6700  142.6800      11.2        90       937        99
VIS    2025250    200200   21.6600  142.6600      12.0        89       938        97
VIS    2025250    200200   21.6500  142.6300      12.5        88       940        99
VIS    2025250    200200   21.6500  142.6200      12.3        88       940        99
VIS    2025250    200200   21.6600  142.5900      12.0        90       938       100
VIS    2025250    200200   21.6600  142.5500      12.1        90       937       100
VIS    2025250    200200   21.6700  142.5300      12.3        89       934        99
VIS    2025250    200200   21.6600  142.5000      12.6        91       932        98
VIS    2025250    200200   21.6600  142.5000      12.6        91       932        98
VIS    2025250    200200   21.6700  142.4700      12.4        91       933        99
VIS    2025250    200200   21.6600  142.4300      11.2        94       942        97
VIS    2025250    200200   21.6700  142.4200      12.0        92       955        98
VIS    2025250    200200   21.7000  149.4900       9.8        87       960        90
VIS    2025250    200200   21.7000  149.4800       9.6        86       942        94
VIS    2025250    200200   21.7100  149.4600       9.7        85       905        97
VIS    2025250    200200   21.7000  149.4200       8.9        87       885        97
VIS    2025250    200200   21.7200  149.4200       8.8        86       885        98
VIS    2025250    200200   21.7100  149.3700       7.5        81       919        99
VIS    2025250    200200   21.7200  149.3500       7.1        79       915        96
VIS    2025250    200200   21.7100  149.3400       7.5        80       915        96
VIS    2025250    200200   21.6900  149.1600       6.8        73       935        97
VIS    2025250    200200   21.7200  149.1400       6.5        71       935        97
VIS    2025250    200200   21.7100  149.1100       6.8        83       909       100
VIS    2025250    200200   21.7100  149.0900       7.7        91       902        98
VIS    2025250    200200   21.7000  149.0700       8.3        91       902        97
VIS    2025250    200200   21.6900  149.0500       7.7        80       900        99
VIS    2025250    200200   21.7100  148.9500       8.0        66       887        91
VIS    2025250    200200   21.7000  148.9100       8.1        85       890        96
VIS    2025250    200200   21.7000  148.9000       8.2        88       890        96
VIS    2025250    200200   21.7100  148.8600       7.9        86       888        99
VIS    2025250    200200   21.6900  148.8500       7.6        82       887        99
VIS    2025250    200200   21.7000  148.8100       7.9        84       888        99
VIS    2025250    200200   21.6900  148.8000       7.8        85       888        99
VIS    2025250    200200   21.7100  148.7800       8.1        84       887        98
VIS    2025250    200200   21.6900  148.7500       7.8        85       815        96
VIS    2025250    200200   21.6900  148.7100       7.8        84       814        94
VIS    2025250    200200   21.6900  148.7000       7.6        83       826        95
VIS    2025250    200200   21.6900  148.6500       7.4        79       848        95
VIS    2025250    200200   21.6900  148.6300       6.9        75       860        95
VIS    2025250    200200   21.6900  148.6100       7.0        72       861        94
VIS    2025250    200200   21.7000  148.6000       7.5        68       870        92
VIS    2025250    200200   21.6900  148.5500       8.5        77       923        99
VIS    2025250    200200   21.7100  148.5300       9.0        79       908        99
VIS    2025250    200200   21.6900  148.5000       8.8        78       923        99
VIS    2025250    200200   21.6900  148.4900       8.8        77       948        99
VIS    2025250    200200   21.6900  148.4700       9.2        80       978        98
VIS    2025250    200200   21.6900  148.4300       9.2        83       995        99
VIS    2025250    200200   21.7100  148.4200       8.7        82       981        99
VIS    2025250    200200   21.7000  148.4000       9.2        82       974       100
VIS    2025250    200200   21.6800  148.3700       9.0        83       940        99
VIS    2025250    200200   21.6800  148.3400       8.8        85       922       100
VIS    2025250    200200   21.6800  148.3000       7.7        84       926        98
VIS    2025250    200200   21.6900  148.2900       7.6        83       921        98
VIS    2025250    200200   21.6800  148.2700       8.0        84       907        96
VIS    2025250    200200   21.6900  148.2200       8.1        73       939        95
VIS    2025250    200200   21.7000  148.2000       9.3        80       923        99
VIS    2025250    200200   21.7000  148.1900       9.5        80       923        99
VIS    2025250    200200   21.6800  148.1500       8.6        81       927        98
VIS    2025250    200200   21.6900  148.1200       8.1        81       893        96
VIS    2025250    200200   21.6900  148.1200       8.0        82       893        96
VIS    2025250    200200   21.7000  148.0800       8.9        87       897        98
VIS    2025250    200200   21.6800  148.0700       8.6        92       922        95
VIS    2025250    200200   21.7000  148.0400       8.4        92       949        91
VIS    2025250    200200   21.6800  148.0200       8.0        94       831        92
VIS    2025250    200200   21.6800  147.9900       7.8        88       822        94
VIS    2025250    200200   21.7000  147.9500       7.4        78       867        94
VIS    2025250    200200   21.6900  147.9300       7.4        74       863        92
VIS    2025250    200200   21.7000  147.9100       7.3        76       858        92
VIS    2025250    200200   21.6900  147.8700       8.4        83       886        96
VIS    2025250    200200   21.6800  147.8400       7.6        85       897        98
VIS    2025250    200200   21.6800  147.8300       7.3        89       884        98
VIS    2025250    200200   21.7000  147.7800       8.5       113       778        93
VIS    2025250    200200   21.6900  147.7500       8.5       113       717        97
VIS    2025250    200200   21.7000  147.7300       7.5       102       723        97
VIS    2025250    200200   21.6900  147.7000       7.8        94       737        94
VIS    2025250    200200   21.6800  147.6700       8.6       102       778        98
VIS    2025250    200200   21.6800  147.6600       9.0       107       778        99
VIS    2025250    200200   21.6700  147.6300       9.7       107       818        99
VIS    2025250    200200   21.6700  147.6000      10.1       102       923        94
VIS    2025250    200200   21.6700  147.5700      10.3        88       890       100
VIS    2025250    200200   21.6700  147.5600      10.1        86       843        93
VIS    2025250    200200   21.6700  147.5300       9.1        91       765        94
VIS    2025250    200200   21.6700  147.5100       8.4        95       734        94
VIS    2025250    200200   21.6800  147.4700       8.5        95       709        91
VIS    2025250    200200   21.6800  147.4600       8.7        94       711        91
VIS    2025250    200200   21.6800  147.3600      10.2        84       816        91
VIS    2025250    200200   21.6900  147.3400      10.1        85       828        92
VIS    2025250    200200   21.6900  147.3300       9.8        85       828        93
VIS    2025250    200200   21.6900  147.2600       9.7        85       943        93
VIS    2025250    200200   21.6700  146.8700      11.7        82       951        98
VIS    2025250    200200   21.6800  146.8400      10.6        83       890        92
VIS    2025250    200200   21.6700  146.7300      10.0        91       732        92
VIS    2025250    200200   21.6800  146.7000       9.5        91       734        92
VIS    2025250    200200   21.6800  146.6900       9.5        93       739        93
VIS    2025250    200200   21.6600  146.6600       9.2        93       710        92
VIS    2025250    200200   21.6800  146.6300       8.4        94       700        91
VIS    2025250    200200   21.6800  146.6100       8.2        92       704        90
VIS    2025250    200200   21.6600  146.5700       8.7       100       711        96
VIS    2025250    200200   21.6800  146.5500       8.0        97       711        96
VIS    2025250    200200   21.6800  146.5400       7.9        98       711        96
VIS    2025250    200200   21.6700  146.5000       8.8       102       721        97
VIS    2025250    200200   21.6800  146.4900       9.2       100       727        95
VIS    2025250    200200   21.6800  146.4500      10.1       100       732        92
VIS    2025250    200200   21.6600  146.4300       9.8       102       715        96
VIS    2025250    200200   21.6800  146.4000       9.4        99       771        94
VIS    2025250    200200   21.6800  146.3900       9.7        99       807        91
VIS    2025250    200200   21.6700  146.3500      10.8        93       928        94
VIS    2025250    200200   21.6800  146.3300      10.2        99       928        95
VIS    2025250    200200   21.6800  146.3100      10.8        97       769        94
VIS    2025250    200200   21.6700  146.2300      14.7        89       879        93
VIS    2025250    200200   21.6800  146.1000      14.5        85       912        98
VIS    2025250    200200   21.6800  146.0700      15.0        85       899        94
VIS    2025250    200200   21.6600  145.9600      10.9       100       733        95
VIS    2025250    200200   21.6500  145.6600       9.3       112       723        98
VIS    2025250    200200   21.6500  145.6200      10.4       105       728        97
VIS    2025250    200200   21.6600  145.6100      10.8       102       739        96
VIS    2025250    200200   21.6700  145.5800      11.7        94       740        92
VIS    2025250    200200   21.6700  145.5500      10.8        98       712        95
VIS    2025250    200200   21.6500  145.4400       9.1        91       726        92
VIS    2025250    200200   21.6400  143.3800      13.3        91       912        97
VIS    2025250    200200   21.6400  143.3500      13.3        90       912        95
VIS    2025250    200200   21.6300  143.3300      14.2        88       914        95
VIS    2025250    200200   21.6500  143.3200      14.1        88       916        95
VIS    2025250    200200   21.6500  143.2900      14.0        87       920        96
VIS    2025250    200200   21.6300  143.2600      13.7        85       921        97
VIS    2025250    200200   21.6500  143.2300      13.0        89       922        98
VIS    2025250    200200   21.6300  143.2000      13.0        89       926        98
VIS    2025250    200200   21.6300  143.2000      13.1        89       926        98
VIS    2025250    200200   21.6400  143.1700      13.5        88       924        98
VIS    2025250    200200   21.6400  143.1500      13.4        88       923        96
VIS    2025250    200200   21.6300  143.1000      13.5        86       938        98
VIS    2025250    200200   21.6400  143.0800      13.3        87       949        99
VIS    2025250    200200   21.6500  143.0600      13.5        87       949        99
VIS    2025250    200200   21.6500  143.0300      13.5        88       947        99
VIS    2025250    200200   21.6500  143.0300      13.4        88       947        99
VIS    2025250    200200   21.6400  142.9800      13.0        87       956        98
VIS    2025250    200200   21.6500  142.9700      13.1        87       950        99
VIS    2025250    200200   21.6500  142.9400      12.8        87       949       100
VIS    2025250    200200   21.6400  142.9100      13.4        87       947        99
VIS    2025250    200200   21.6400  142.9000      13.6        87       947        99
VIS    2025250    200200   21.6500  142.8700      14.1        86       948        98
VIS    2025250    200200   21.6400  142.8400      12.6        87       953        97
VIS    2025250    200200   21.6500  142.8300      12.6        88       943        98
VIS    2025250    200200   21.6300  142.7800      14.8        96       926        92
VIS    2025250    200200   21.6300  142.7800      14.9        96       926        90
VIS    2025250    200200   21.6400  142.7400      12.9        99       921        95
VIS    2025250    200200   21.6300  142.7100      11.4        91       932       100
VIS    2025250    200200   21.6300  142.7000      11.6        90       932       100
VIS    2025250    200200   21.6500  142.6600      12.1        88       937        95
VIS    2025250    200200   21.6500  142.6500      12.0        88       937        95
VIS    2025250    200200   21.6300  142.6300      12.5        87       936        97
VIS    2025250    200200   21.6300  142.6000      12.2        86       932        99
VIS    2025250    200200   21.6400  142.5700      11.9        89       928       100
VIS    2025250    200200   21.6300  142.5400      12.0        92       925        99
VIS    2025250    200200   21.6500  142.5200      12.3        91       930        98
VIS    2025250    200200   21.6300  142.5000      11.5        95       930        95
VIS    2025250    200200   21.6400  142.4700      10.5        94       939        93
VIS    2025250    200200   21.6300  142.4400      11.0        94       953        94
VIS    2025250    200200   21.6300  142.4200      11.1        94       955        93
VIS    2025250    200200   21.6700  149.4900       9.5        86       917        96
VIS    2025250    200200   21.6900  149.4800       9.5        86       917        96
VIS    2025250    200200   21.6900  149.4500       9.1        84       885        98
VIS    2025250    200200   21.6900  149.4200       8.7        87       885        98
VIS    2025250    200200   21.6900  149.4100       8.3        87       890        98
VIS    2025250    200200   21.6900  149.3600       7.4        81       919        98
VIS    2025250    200200   21.6700  149.2100       7.6        76      1000        99
VIS    2025250    200200   21.6800  149.1800       6.8        79       947        97
VIS    2025250    200200   21.6900  149.1500       7.0        75       928        98
VIS    2025250    200200   21.6800  149.1200       7.5        81       909       100
VIS    2025250    200200   21.6800  149.1200       7.7        82       909       100
VIS    2025250    200200   21.6700  149.0700       8.1        82       902        99
VIS    2025250    200200   21.6900  149.0700       8.3        89       902        97
VIS    2025250    200200   21.6700  149.0200       7.6        62       887        91
VIS    2025250    200200   21.6800  148.9400       7.7        82       890        99
VIS    2025250    200200   21.6700  148.9400       7.9        83       891        99
VIS    2025250    200200   21.6900  148.9100       8.0        84       890        96
VIS    2025250    200200   21.6700  148.8800       8.2        89       888        98
VIS    2025250    200200   21.6800  148.8400       7.7        84       887        99
VIS    2025250    200200   21.6800  148.8400       7.6        83       887        99
VIS    2025250    200200   21.6800  148.8100       7.7        84       887        98
VIS    2025250    200200   21.6600  148.7800       7.3        81       887        98
VIS    2025250    200200   21.6800  148.7400       7.7        86       814        96
VIS    2025250    200200   21.6700  148.7200       7.9        86       814        95
VIS    2025250    200200   21.6800  148.6900       7.7        84       830        96
VIS    2025250    200200   21.6800  148.6600       7.6        80       848        96
VIS    2025250    200200   21.6800  148.6400       7.0        75       860        95
VIS    2025250    200200   21.6800  148.6300       6.9        75       860        95
VIS    2025250    200200   21.6700  148.5200       8.5        79       945        99
VIS    2025250    200200   21.6800  148.5000       8.8        79       962       100
VIS    2025250    200200   21.6800  148.4700       9.1        81       971        99
VIS    2025250    200200   21.6700  148.4100       8.9        84       992        99
VIS    2025250    200200   21.6600  148.4000       8.7        83       959        98
VIS    2025250    200200   21.6800  148.3800       8.8        82       941        99
VIS    2025250    200200   21.6600  148.3400       8.2        83       918        99
VIS    2025250    200200   21.6600  148.3100       8.1        85       922        98
VIS    2025250    200200   21.6600  148.3000       8.1        85       921        97
VIS    2025250    200200   21.6800  148.2800       7.9        86       917        97
VIS    2025250    200200   21.6700  148.2300       7.9        75       960        95
VIS    2025250    200200   21.6600  148.2100       7.9        75       960        95
VIS    2025250    200200   21.6800  148.2000       8.2        74       934        97
VIS    2025250    200200   21.6800  148.1700       9.1        80       927        99
VIS    2025250    200200   21.6800  148.1500       8.9        80       927        98
VIS    2025250    200200   21.6700  148.1200       8.9        80       899        98
VIS    2025250    200200   21.6500  148.0800       8.1        82       902        95
VIS    2025250    200200   21.6800  148.0700       8.5        90       919        95
VIS    2025250    200200   21.6700  148.0200       7.5        93       831        93
VIS    2025250    200200   21.6700  147.9900       7.6        87       820        93
VIS    2025250    200200   21.6500  147.9500       6.8        75       871        94
VIS    2025250    200200   21.6500  147.9300       7.1        77       879        90
VIS    2025250    200200   21.6600  147.9200       7.4        76       879        91
VIS    2025250    200200   21.6700  147.8500       7.7        86       886        98
VIS    2025250    200200   21.6700  147.8400       7.3        87       884        97
VIS    2025250    200200   21.6700  147.7200       8.2       104       723        98
VIS    2025250    200200   21.6500  147.6800       8.4        95       818        96
VIS    2025250    200200   21.6600  147.6600       9.0       102       797        98
VIS    2025250    200200   21.6500  147.6200       9.0        95       820        97
VIS    2025250    200200   21.6500  147.6000       9.6        91       843        97
VIS    2025250    200200   21.6600  147.5800      10.3        91       890       100
VIS    2025250    200200   21.6500  147.5600      10.5        86       834        92
VIS    2025250    200200   21.6600  147.5400       9.8        86       808        91
VIS    2025250    200200   21.6700  147.5100       8.8        91       745        93
VIS    2025250    200200   21.6500  147.4900       9.1        89       740        91
VIS    2025250    200200   21.6600  147.3700      10.7        84       850        91
VIS    2025250    200200   21.6700  147.3000       9.9        85       898        95
VIS    2025250    200200   21.6600  146.8600      12.2        82       940        99
VIS    2025250    200200   21.6500  146.8400      12.2        82       940        97
VIS    2025250    200200   21.6400  146.8200      11.2        84       923        94
VIS    2025250    200200   21.6500  146.8000      11.1        88       854        90
VIS    2025250    200200   21.6400  146.7700      10.8        96       772        92
VIS    2025250    200200   21.6500  146.7500      10.8        96       732        91
VIS    2025250    200200   21.6400  146.7200       8.8        89       730        92
VIS    2025250    200200   21.6400  146.6800       9.9        94       711        91
VIS    2025250    200200   21.6500  146.6600       9.4        91       710        91
VIS    2025250    200200   21.6400  146.6500       8.5        85       710        90
VIS    2025250    200200   21.6400  146.6100       8.0        88       726        92
VIS    2025250    200200   21.6400  146.5900       8.6        98       719        96
VIS    2025250    200200   21.6400  146.5600       8.6       100       718        97
VIS    2025250    200200   21.6400  146.5500       8.3       100       718        96
VIS    2025250    200200   21.6400  146.5300       8.7       101       718        96
VIS    2025250    200200   21.6500  146.4900       9.7       103       714        97
VIS    2025250    200200   21.6400  146.4600      10.4       107       710        96
VIS    2025250    200200   21.6600  146.4300       9.8       104       713        96
VIS    2025250    200200   21.6400  146.4100       9.4        99       715        95
VIS    2025250    200200   21.6500  146.3900       9.8        89       828        92
VIS    2025250    200200   21.6300  146.3600      12.0        88       881        96
VIS    2025250    200200   21.6300  146.3400      12.9        89       881        94
VIS    2025250    200200   21.6500  146.2500      15.0        88       919        97
VIS    2025250    200200   21.6300  146.2200      15.2        90       920        96
VIS    2025250    200200   21.6500  146.1400      15.6        88       914        96
VIS    2025250    200200   21.6500  146.1300      15.3        86       914        97
VIS    2025250    200200   21.6500  146.0900      14.7        85       912        98
VIS    2025250    200200   21.6500  146.0600      13.6        84       882        94
VIS    2025250    200200   21.6500  145.9600      11.0        96       786        93
VIS    2025250    200200   21.6500  145.6500       9.2       110       726        98
VIS    2025250    200200   21.6300  145.6100      10.4       109       728        98
VIS    2025250    200200   21.6400  145.5900      11.1       101       727        96
VIS    2025250    200200   21.6400  145.4300       9.9        89       739        90
VIS    2025250    200200   21.6300  143.3800      13.9        92       911        96
VIS    2025250    200200   21.6100  143.3400      14.2        88       915        95
VIS    2025250    200200   21.6100  143.3200      14.1        87       916        95
VIS    2025250    200200   21.6100  143.3100      14.0        87       918        96
VIS    2025250    200200   21.6100  143.2900      13.7        86       921        97
VIS    2025250    200200   21.6200  143.2500      13.6        85       925        98
VIS    2025250    200200   21.6200  143.2300      13.3        86       927        98
VIS    2025250    200200   21.6300  143.2000      13.2        88       927        98
VIS    2025250    200200   21.6300  143.1800      13.4        88       934        98
VIS    2025250    200200   21.6200  143.1500      13.6        88       935        98
VIS    2025250    200200   21.6200  143.1200      13.6        86       935        97
VIS    2025250    200200   21.6200  143.1100      13.6        85       936        98
VIS    2025250    200200   21.6200  143.0800      13.5        85       928        97
VIS    2025250    200200   21.6300  143.0500      13.5        86       931        97
VIS    2025250    200200   21.6300  143.0200      13.1        88       944        98
VIS    2025250    200200   21.6200  143.0100      13.2        88       944        98
VIS    2025250    200200   21.6300  142.9800      13.4        87       955        98
VIS    2025250    200200   21.6200  142.9600      13.4        88       956        98
VIS    2025250    200200   21.6100  142.9200      13.7        89       959        99
VIS    2025250    200200   21.6100  142.9100      13.8        89       960        99
VIS    2025250    200200   21.6200  142.8800      13.7        88       966        99
VIS    2025250    200200   21.6100  142.8500      13.5        88       969        97
VIS    2025250    200200   21.6200  142.8400      12.8        87       960        95
VIS    2025250    200200   21.6200  142.8200      12.8        88       955        92
VIS    2025250    200200   21.6200  142.7800      14.1        94       940        96
VIS    2025250    200200   21.6100  142.7600      13.0        94       932        99
VIS    2025250    200200   21.6000  142.7200      11.3        92       932        99
VIS    2025250    200200   21.6200  142.7100      11.2        91       932       100
VIS    2025250    200200   21.6200  142.6800      12.0        89       933        99
VIS    2025250    200200   21.6200  142.6600      12.4        89       929        96
VIS    2025250    200200   21.6100  142.6400      12.0        87       929        96
VIS    2025250    200200   21.6000  142.6000      12.0        86       923        98
VIS    2025250    200200   21.6200  142.5900      12.1        86       928        99
VIS    2025250    200200   21.6200  142.5500      11.8        91       924        99
VIS    2025250    200200   21.6200  142.5400      12.0        92       924        99
VIS    2025250    200200   21.6200  142.5100      11.5        94       927        97
VIS    2025250    200200   21.6000  142.4900      11.1        94       927        96
VIS    2025250    200200   21.6000  142.4500      11.1        93       941        96
VIS    2025250    200200   21.6200  142.4500      11.1        94       941        96
VIS    2025250    200200   21.6000  142.4000      11.5        93       985        96
VIS    2025250    200200   21.6700  150.2300       8.9        88       954        96
VIS    2025250    200200   21.6700  149.9200      11.1        91       936        92
VIS    2025250    200200   21.6800  149.9100      11.1        91       949        90
VIS    2025250    200200   21.6700  149.5200      10.3        84       966        91
VIS    2025250    200200   21.6500  149.5000       9.8        80       939        95
VIS    2025250    200200   21.6500  149.4800       9.3        81       893        97
VIS    2025250    200200   21.6600  149.4500       8.4        83       885        99
VIS    2025250    200200   21.6600  149.4300       8.1        82       885        98
VIS    2025250    200200   21.6700  149.4100       8.0        84       889        98
VIS    2025250    200200   21.6500  149.3700       7.5        81       930        97
VIS    2025250    200200   21.6500  149.1900       7.4        74       979        99
VIS    2025250    200200   21.6600  149.1800       7.1        83       947        98
VIS    2025250    200200   21.6600  149.1400       7.7        83       923       100
VIS    2025250    200200   21.6500  149.1300       7.9        82       914        99
VIS    2025250    200200   21.6400  149.0900       7.7        74       912        99
VIS    2025250    200200   21.6500  149.0600       7.6        72       902        97
VIS    2025250    200200   21.6600  149.0600       7.9        75       900        98
VIS    2025250    200200   21.6600  149.0200       7.6        61       887        91
VIS    2025250    200200   21.6500  149.0000       7.2        68       887        92
VIS    2025250    200200   21.6600  148.9700       7.5        83       890        99
VIS    2025250    200200   21.6500  148.9400       7.9        86       890        99
VIS    2025250    200200   21.6400  148.9200       8.4        85       890        98
VIS    2025250    200200   21.6400  148.8900       8.3        87       888        98
VIS    2025250    200200   21.6400  148.8600       8.3        86       888        98
VIS    2025250    200200   21.6600  148.8500       8.0        85       887        99
VIS    2025250    200200   21.6500  148.8300       7.8        82       887        97
VIS    2025250    200200   21.6600  148.7800       7.2        80       887        98
VIS    2025250    200200   21.6600  148.7700       7.4        82       886        99
VIS    2025250    200200   21.6400  148.7400       8.3        86       883        97
VIS    2025250    200200   21.6500  148.7200       8.2        88       863        98
VIS    2025250    200200   21.6400  148.6900       7.8        87       863        99
VIS    2025250    200200   21.6400  148.6800       7.8        87       861        99
VIS    2025250    200200   21.6500  148.6400       7.6        78       864        93
VIS    2025250    200200   21.6600  148.6300       7.1        73       893        91
VIS    2025250    200200   21.6600  148.5400       8.4        80       940        99
VIS    2025250    200200   21.6400  148.5000       8.9        80       980        96
VIS    2025250    200200   21.6400  148.4800       9.2        81       968        99
VIS    2025250    200200   21.6400  148.4700       9.3        82       948        99
VIS    2025250    200200   21.6400  148.4300       8.6        84       959        98
VIS    2025250    200200   21.6400  148.4200       8.6        83       959        98
VIS    2025250    200200   21.6400  148.3900       8.6        82       941        97
VIS    2025250    200200   21.6300  148.3600       7.9        81       894        98
VIS    2025250    200200   21.6500  148.3400       8.1        83       917        99
VIS    2025250    200200   21.6500  148.3100       8.2        85       940        96
VIS    2025250    200200   21.6300  148.2700       8.6        87       946        98
VIS    2025250    200200   21.6400  148.2600       8.6        88       944        98
VIS    2025250    200200   21.6400  148.2400       8.5        86       952        98
VIS    2025250    200200   21.6500  148.2100       7.7        78       958        95
VIS    2025250    200200   21.6500  148.1800       8.3        79       919        98
VIS    2025250    200200   21.6400  148.1500      10.1        80       927       100
VIS    2025250    200200   21.6400  148.1400      10.1        80       927       100
VIS    2025250    200200   21.6400  148.1100       9.2        80       925        99
VIS    2025250    200200   21.6400  148.0900       8.5        81       909        96
VIS    2025250    200200   21.6400  148.0700       7.8        87       902        92
VIS    2025250    200200   21.6400  148.0200       7.0        79       745        90
VIS    2025250    200200   21.6300  147.9700       6.9        81       842        94
VIS    2025250    200200   21.6300  147.9500       6.9        77       871        93
VIS    2025250    200200   21.6500  147.9200       7.7        80       878        93
VIS    2025250    200200   21.6300  147.8800       7.3       101       864        97
VIS    2025250    200200   21.6300  147.8100       8.3       113       727        93
VIS    2025250    200200   21.6300  147.7800       8.7       104       720        95
VIS    2025250    200200   21.6200  147.7100      10.1        98       737        93
VIS    2025250    200200   21.6300  147.6700       9.0        88       820        94
VIS    2025250    200200   21.6200  147.6600       9.0        88       809        93
VIS    2025250    200200   21.6200  147.5300       9.9        86       765        90
VIS    2025250    200200   21.6400  147.4800       9.6        86       745        90
VIS    2025250    200200   21.6200  146.8100      11.7        85       923        92
VIS    2025250    200200   21.6300  146.7900      10.9        90       869        94
VIS    2025250    200200   21.6300  146.7700      10.5        96       772        93
VIS    2025250    200200   21.6100  146.7200       8.6        85       746        90
VIS    2025250    200200   21.6200  146.7000       9.3        90       723        92
VIS    2025250    200200   21.6200  146.6800       9.8        91       723        90
VIS    2025250    200200   21.6200  146.6000       8.5        94       753        93
VIS    2025250    200200   21.6100  146.5700       9.0        98       720        95
VIS    2025250    200200   21.6200  146.5600       8.8       100       719        96
VIS    2025250    200200   21.6300  146.5400       8.6       100       719        95
VIS    2025250    200200   21.6200  146.5000      10.1       106       711        97
VIS    2025250    200200   21.6200  146.4900      10.3       107       711        96
VIS    2025250    200200   21.6200  146.4500      10.2       109       703        96
VIS    2025250    200200   21.6200  146.4300      10.0       107       707        97
VIS    2025250    200200   21.6300  146.4200       9.7       102       715        97
VIS    2025250    200200   21.6100  146.3700      13.6        90       918       100
VIS    2025250    200200   21.6200  146.3500      13.3        88       918        98
VIS    2025250    200200   21.6100  146.3400      13.9        90       915        97
VIS    2025250    200200   21.6100  146.3100      13.8        89       881        92
VIS    2025250    200200   21.6100  146.2800      14.0        84       922        97
VIS    2025250    200200   21.6200  146.2400      15.4        86       922        97
VIS    2025250    200200   21.6200  146.2200      15.4        89       920        97
VIS    2025250    200200   21.6300  146.2200      15.1        89       920        96
VIS    2025250    200200   21.6100  146.1600      15.1        85       914        97
VIS    2025250    200200   21.6300  146.1400      15.4        84       915        97
VIS    2025250    200200   21.6100  146.1000      13.9        80       902        97
VIS    2025250    200200   21.6200  145.9700      12.0        93       797        91
VIS    2025250    200200   21.6100  145.9600      11.8        96       812        93
VIS    2025250    200200   21.6000  145.9400      10.3       114       745        96
VIS    2025250    200200   21.6100  145.6700      10.4       102       802        95
VIS    2025250    200200   21.6200  145.6400       9.8       102       796        95
VIS    2025250    200200   21.6200  145.6300       9.9       105       756        95
VIS    2025250    200200   21.6100  145.5200      14.1        86       899        98
VIS    2025250    200200   21.6100  145.5100      14.2        87       899        98
VIS    2025250    200200   21.6100  145.3900      11.1        94       739        91
VIS    2025250    200200   21.6100  144.4000      14.3        91       897        96
VIS    2025250    200200   21.5900  144.3900      14.9        88       890        94
VIS    2025250    200200   21.6000  143.3300      14.4        88       915        95
VIS    2025250    200200   21.6000  143.3100      13.9        87       922        97
VIS    2025250    200200   21.6000  143.3000      13.7        86       922        97
VIS    2025250    200200   21.6000  143.2600      13.6        86       942        99
VIS    2025250    200200   21.6000  143.2500      13.5        86       958       100
VIS    2025250    200200   21.5800  143.2200      13.7        87       958        99
VIS    2025250    200200   21.5800  143.1900      13.7        89       925        95
VIS    2025250    200200   21.5800  143.1800      13.8        89       925        96
VIS    2025250    200200   21.6000  143.1500      14.1        87       934        97
VIS    2025250    200200   21.5900  143.1100      14.1        86       926        96
VIS    2025250    200200   21.5800  143.0800      13.9        86       926        97
VIS    2025250    200200   21.5800  143.0800      14.0        86       926        96
VIS    2025250    200200   21.5800  143.0400      14.8        90       929        95
VIS    2025250    200200   21.5900  143.0100      14.0        90       938        96
VIS    2025250    200200   21.5800  142.9900      13.9        91       938        97
VIS    2025250    200200   21.5800  142.9600      13.7        90       942        98
VIS    2025250    200200   21.5900  142.9400      13.8        90       949        98
VIS    2025250    200200   21.5800  142.9200      13.6        91       954        99
VIS    2025250    200200   21.5800  142.8900      13.6        89       965        99
VIS    2025250    200200   21.5800  142.8600      13.6        88       971        98
VIS    2025250    200200   21.5900  142.8400      13.3        88       971        96
VIS    2025250    200200   21.5900  142.8300      13.1        88       964        96
VIS    2025250    200200   21.5900  142.8000      13.5        88       959        95
VIS    2025250    200200   21.5900  142.7600      13.3        89       940        97
VIS    2025250    200200   21.5900  142.7600      13.0        89       940        98
VIS    2025250    200200   21.5900  142.7200      11.7        91       932        99
VIS    2025250    200200   21.5800  142.6900      11.7        92       932       100
VIS    2025250    200200   21.5800  142.6700      12.0        90       927        98
VIS    2025250    200200   21.5900  142.6500      11.8        88       926        97
VIS    2025250    200200   21.6000  142.6300      11.7        87       925        97
VIS    2025250    200200   21.5800  142.6000      12.4        89       921        98
VIS    2025250    200200   21.5800  142.5800      12.7        89       921        97
VIS    2025250    200200   21.5900  142.5500      12.3        91       924        99
VIS    2025250    200200   21.6000  142.5300      12.1        94       924        97
VIS    2025250    200200   21.5800  142.4900      11.7        92       926        98
VIS    2025250    200200   21.5800  142.4700      11.4        93       930        98
VIS    2025250    200200   21.5800  142.4400      11.0        93       950        97
VIS    2025250    200200   21.5800  142.4300      11.2        93       966        96
VIS    2025250    200200   21.5800  142.4100      11.1        91       953        98
VIS    2025250    200200   21.6400  149.8800      10.9        91       946        91
VIS    2025250    200200   21.6400  149.5400      10.4        85       968        91
VIS    2025250    200200   21.6200  149.5200      10.2        82       964        92
VIS    2025250    200200   21.6400  149.4900       9.5        79       915        96
VIS    2025250    200200   21.6400  149.4600       8.8        81       886        98
VIS    2025250    200200   21.6300  149.4400       8.3        82       880        98
VIS    2025250    200200   21.6300  149.4300       8.2        83       886        99
VIS    2025250    200200   21.6200  149.4100       7.9        85       898        98
VIS    2025250    200200   21.6200  149.3700       7.7        86       917        92
VIS    2025250    200200   21.6300  149.3500       7.7        85       922        93
VIS    2025250    200200   21.6300  149.3300       7.8        83       947        92
VIS    2025250    200200   21.6200  149.2800       7.9        73       959        94
VIS    2025250    200200   21.6200  149.2800       7.9        73       959        94
VIS    2025250    200200   21.6200  149.2500       9.2        76       968        92
VIS    2025250    200200   21.6200  149.1800       7.9        65       968        96
VIS    2025250    200200   21.6200  149.1600       7.8        74       924        99
VIS    2025250    200200   21.6200  149.1400       8.0        80       917       100
VIS    2025250    200200   21.6400  149.1200       8.2        81       913        99
VIS    2025250    200200   21.6200  149.0800       7.2        70       905        98
VIS    2025250    200200   21.6200  149.0700       7.1        70       900        96
VIS    2025250    200200   21.6400  149.0300       7.2        61       887        91
VIS    2025250    200200   21.6400  149.0100       7.1        64       887        90
VIS    2025250    200200   21.6300  148.9900       7.1        79       888        98
VIS    2025250    200200   21.6300  148.9600       7.9        84       889        99
VIS    2025250    200200   21.6300  148.9300       8.5        83       889        97
VIS    2025250    200200   21.6200  148.9100       9.0        82       887        95
VIS    2025250    200200   21.6300  148.8900       8.6        86       887        97
VIS    2025250    200200   21.6300  148.8600       8.4        86       888        98
VIS    2025250    200200   21.6100  148.8200       7.8        81       890        96
VIS    2025250    200200   21.6100  148.8200       7.6        81       890        96
VIS    2025250    200200   21.6200  148.7800       7.4        81       889        99
VIS    2025250    200200   21.6200  148.7600       7.8        85       889        98
VIS    2025250    200200   21.6300  148.7500       8.2        86       884        98
VIS    2025250    200200   21.6200  148.7100       8.1        88       876        99
VIS    2025250    200200   21.6200  148.6900       8.0        85       871        99
VIS    2025250    200200   21.6300  148.6600       8.0        87       871        98
VIS    2025250    200200   21.6300  148.6400       7.9        82       893        93
VIS    2025250    200200   21.6100  148.5200       8.8        81       989        98
VIS    2025250    200200   21.6100  148.5000       9.2        80       989        98
VIS    2025250    200200   21.6200  148.4700       9.5        82       948        99
VIS    2025250    200200   21.6200  148.4700       9.5        82       948        99
VIS    2025250    200200   21.6100  148.4400       9.0        82       926        98
VIS    2025250    200200   21.6100  148.3900       8.3        82       953        98
VIS    2025250    200200   21.6100  148.3800       8.2        81       896        98
VIS    2025250    200200   21.6100  148.3500       7.9        81       894        97
VIS    2025250    200200   21.6200  148.3400       7.9        80       899        97
VIS    2025250    200200   21.6100  148.3000       8.2        81       970        99
VIS    2025250    200200   21.6100  148.2700       8.4        85       912       100
VIS    2025250    200200   21.6300  148.2400       8.5        87       944        98
VIS    2025250    200200   21.6100  148.2300       8.0        85       930        96
VIS    2025250    200200   21.6100  148.2100       7.5        84       914        95
VIS    2025250    200200   21.6200  148.1700       8.6        86       899        99
VIS    2025250    200200   21.6000  148.1600       8.5        87       899        99
VIS    2025250    200200   21.6100  148.1200       9.2        80       920        98
VIS    2025250    200200   21.6100  148.0900       8.0        86       904        91
VIS    2025250    200200   21.6100  148.0900       7.9        85       904        91
VIS    2025250    200200   21.6100  147.9900       7.1        75       809        90
VIS    2025250    200200   21.6200  147.9800       6.9        79       809        91
VIS    2025250    200200   21.6200  147.9500       6.9        78       871        93
VIS    2025250    200200   21.6100  147.9100       7.1        91       870        90
VIS    2025250    200200   21.6200  147.8900       7.4        99       864        96
VIS    2025250    200200   21.6200  147.8800       7.2       105       864        97
VIS    2025250    200200   21.6000  147.8100       8.6       114       727        96
VIS    2025250    200200   21.6200  147.7900       8.3       105       727        96
VIS    2025250    200200   21.6200  147.7700       8.8       106       701        95
VIS    2025250    200200   21.6000  147.7100       9.3        91       770        93
VIS    2025250    200200   21.6100  147.7000       9.8        90       783        93
VIS    2025250    200200   21.6000  147.6700       9.6        85       832        93
VIS    2025250    200200   21.6200  147.6500       9.0        87       805        93
VIS    2025250    200200   21.6100  147.5300      10.1        85       749        90
VIS    2025250    200200   21.6000  147.5200       9.9        86       765        90
VIS    2025250    200200   21.6000  147.4200       9.9        86       820        90
VIS    2025250    200200   21.6000  146.8300      11.9        83       990        95
VIS    2025250    200200   21.6100  146.8300      12.2        83       976        93
VIS    2025250    200200   21.6000  146.7900      10.9        89       890        97
VIS    2025250    200200   21.5900  146.7500       7.9        97       803        91
VIS    2025250    200200   21.5900  146.6000       8.8        92       783        91
VIS    2025250    200200   21.5900  146.5800       9.2        97       715        93
VIS    2025250    200200   21.6000  146.5600       9.2        98       719        95
VIS    2025250    200200   21.5900  146.5300       9.9       103       716        96
VIS    2025250    200200   21.5900  146.5200       9.9       103       720        97
VIS    2025250    200200   21.5900  146.4900      10.6       106       702        94
VIS    2025250    200200   21.5900  146.4500       9.9       105       702        96
VIS    2025250    200200   21.6000  146.4300       9.9       106       707        97
VIS    2025250    200200   21.5900  146.4100      10.4       100       766        94
VIS    2025250    200200   21.5800  146.3800      14.1        89       906        98
VIS    2025250    200200   21.5900  146.3600      14.5        89       918        99
VIS    2025250    200200   21.5900  146.3400      14.8        92       925        98
VIS    2025250    200200   21.5800  146.3000      15.1        88       932        98
VIS    2025250    200200   21.6000  146.2700      14.5        81       929        97
VIS    2025250    200200   21.6000  146.2400      15.3        85       928        98
VIS    2025250    200200   21.5900  146.1900      16.1        86       926        96
VIS    2025250    200200   21.5900  146.1500      15.5        84       926        98
VIS    2025250    200200   21.5800  146.1300      15.0        86       926        98
VIS    2025250    200200   21.6000  146.1000      14.0        81       912        98
VIS    2025250    200200   21.6000  146.0900      13.4        80       888        95
VIS    2025250    200200   21.5800  146.0000      14.3        83       876        92
VIS    2025250    200200   21.5800  145.9800      12.4        91       873        97
VIS    2025250    200200   21.5800  145.9700      11.9        94       873        99
VIS    2025250    200200   21.5900  145.9400       9.9       114       755        96
VIS    2025250    200200   21.5800  145.9100       9.9       118       709        96
VIS    2025250    200200   21.5800  145.7800      14.3        81       876        91
VIS    2025250    200200   21.5900  145.7600      13.7        82       874        92
VIS    2025250    200200   21.6000  145.7500      13.3        83       873        92
VIS    2025250    200200   21.6000  145.7000      12.4        89       854        91
VIS    2025250    200200   21.5900  145.6800      12.0        91       819        91
VIS    2025250    200200   21.6000  145.6700      11.3        96       819        94
VIS    2025250    200200   21.5900  145.6300      12.1        90       869        95
VIS    2025250    200200   21.5900  145.6000      13.2        85       869        93
VIS    2025250    200200   21.5900  145.5500      14.6        82       946        99
VIS    2025250    200200   21.5800  145.5300      14.7        85       919        98
VIS    2025250    200200   21.5800  145.5200      14.6        85       919        98
VIS    2025250    200200   21.5800  145.4900      14.2        88       899        98
VIS    2025250    200200   21.5900  145.4600      14.5        87       859        90
VIS    2025250    200200   21.5700  144.5200      12.8        95       866        95
VIS    2025250    200200   21.5700  144.4800      14.3        94       871        93
VIS    2025250    200200   21.5700  144.4500      14.2        91       872        93
VIS    2025250    200200   21.5700  144.4400      13.7        92       881        96
VIS    2025250    200200   21.5600  144.4000      13.7        90       881        95
VIS    2025250    200200   21.5800  144.3900      14.4        90       881        93
VIS    2025250    200200   21.5700  143.2900      14.1        86       927        96
VIS    2025250    200200   21.5700  143.2600      14.0        87       929        97
VIS    2025250    200200   21.5800  143.2500      13.8        87       958        99
VIS    2025250    200200   21.5800  143.2300      14.0        87       958        98
VIS    2025250    200200   21.5700  143.1900      13.7        89       923        94
VIS    2025250    200200   21.5700  143.1800      13.7        89       923        93
VIS    2025250    200200   21.5600  143.1500      13.7        88       923        96
VIS    2025250    200200   21.5500  143.1100      13.2        88       926        96
VIS    2025250    200200   21.5700  143.0900      13.6        87       926        97
VIS    2025250    200200   21.5500  143.0700      14.1        89       927        96
VIS    2025250    200200   21.5600  143.0600      14.5        89       927        95
VIS    2025250    200200   21.5600  143.0300      15.0        92       929        94
VIS    2025250    200200   21.5700  143.0000      14.0        93       938        97
VIS    2025250    200200   21.5500  142.9700      13.3        89       943        99
VIS    2025250    200200   21.5600  142.9600      13.4        89       938        99
VIS    2025250    200200   21.5600  142.9300      13.5        90       943        99
VIS    2025250    200200   21.5500  142.9100      13.6        90       954        99
VIS    2025250    200200   21.5700  142.8700      13.7        88       971        98
VIS    2025250    200200   21.5500  142.8500      13.9        88       971        97
VIS    2025250    200200   21.5600  142.8300      13.3        89       950        99
VIS    2025250    200200   21.5500  142.8000      12.9        89       947        96
VIS    2025250    200200   21.5500  142.7800      12.6        90       938        95
VIS    2025250    200200   21.5500  142.7500      13.1        90       936        97
VIS    2025250    200200   21.5500  142.7200      13.0        89       937        98
VIS    2025250    200200   21.5500  142.7000      12.4        88       935        98
VIS    2025250    200200   21.5600  142.6900      12.2        89       932        99
VIS    2025250    200200   21.5500  142.6500      13.7        86       925        96
VIS    2025250    200200   21.5700  142.6400      12.3        88       925        97
VIS    2025250    200200   21.5700  142.6100      12.7        90       921        97
VIS    2025250    200200   21.5600  142.5800      12.6        90       918        97
VIS    2025250    200200   21.5500  142.5500      11.4        88       920        98
VIS    2025250    200200   21.5700  142.5200      12.0        90       921        96
VIS    2025250    200200   21.5700  142.5000      11.8        90       924        95
VIS    2025250    200200   21.5600  142.4900      11.7        90       925        97
VIS    2025250    200200   21.5700  142.4500      10.9        93       949        96
VIS    2025250    200200   21.5700  142.4400      11.0        93       950        96
VIS    2025250    200200   21.5500  142.4000      11.2        91       940        99
VIS    2025250    200200   21.5500  142.3900      11.4        92       940        99
VIS    2025250    200200   21.6000  149.9700      10.7        89       946        92
VIS    2025250    200200   21.6000  149.9500      11.1        89       946        91
VIS    2025250    200200   21.6200  149.9100      11.1        89       944        90
VIS    2025250    200200   21.6100  149.8900      10.6        88       944        92
VIS    2025250    200200   21.6200  149.5200      10.3        83       964        92
VIS    2025250    200200   21.6000  149.4900      10.2        81       930        94
VIS    2025250    200200   21.6100  149.4700       9.6        79       889        96
VIS    2025250    200200   21.6000  149.4400       8.4        84       872        99
VIS    2025250    200200   21.6000  149.4100       8.3        85       889        97
VIS    2025250    200200   21.6200  149.4100       8.1        86       889        99
VIS    2025250    200200   21.6200  149.3800       7.8        86       916        91
VIS    2025250    200200   21.6200  149.3500       7.5        86       941        95
VIS    2025250    200200   21.6100  149.3100       7.0        76       957        95
VIS    2025250    200200   21.6100  149.3100       7.1        75       957        95
VIS    2025250    200200   21.6000  149.2700       8.0        76       952        97
VIS    2025250    200200   21.5900  149.2500       8.0        79       959        99
VIS    2025250    200200   21.5900  149.2100       8.2        67       954        98
VIS    2025250    200200   21.6000  149.1800       8.0        65       954        97
VIS    2025250    200200   21.6100  149.1600       7.7        71       924        99
VIS    2025250    200200   21.5900  149.1400       7.8        78       908        99
VIS    2025250    200200   21.5900  149.1100       7.7        78       905        99
VIS    2025250    200200   21.5900  149.0900       7.6        76       900        99
VIS    2025250    200200   21.6100  149.0800       7.2        72       905        98
VIS    2025250    200200   21.5900  149.0500       7.0        78       886        96
VIS    2025250    200200   21.6000  149.0300       6.5        76       887        97
VIS    2025250    200200   21.6100  148.9900       7.6        93       889        96
VIS    2025250    200200   21.6100  148.9600       8.0        93       889        98
VIS    2025250    200200   21.6100  148.9300       8.5        85       889        97
VIS    2025250    200200   21.6100  148.9100       8.9        80       889        95
VIS    2025250    200200   21.5900  148.9000       8.7        78       890        96
VIS    2025250    200200   21.5900  148.8600       8.4        82       891        97
VIS    2025250    200200   21.6100  148.8300       7.9        82       890        96
VIS    2025250    200200   21.5900  148.8100       8.1        89       890        95
VIS    2025250    200200   21.5900  148.8000       7.9        88       890        97
VIS    2025250    200200   21.6000  148.7700       7.7        86       889        98
VIS    2025250    200200   21.6000  148.7300       8.0        86       890        99
VIS    2025250    200200   21.5900  148.7000       8.1        79       890        98
VIS    2025250    200200   21.5900  148.6900       8.3        79       891        98
VIS    2025250    200200   21.6100  148.6600       8.7        85       891        98
VIS    2025250    200200   21.6000  148.6500       9.1        85       913        96
VIS    2025250    200200   21.5900  148.5200       8.1        80       985        98
VIS    2025250    200200   21.5800  148.5000       8.6        80       980        99
VIS    2025250    200200   21.5900  148.4900       8.9        80       968        99
VIS    2025250    200200   21.6000  148.4600       9.4        80       956        99
VIS    2025250    200200   21.6000  148.4400       9.0        82       926        98
VIS    2025250    200200   21.5800  148.3800       7.7        80       943        93
VIS    2025250    200200   21.6000  148.3600       7.9        81       894        96
VIS    2025250    200200   21.5800  148.3200       8.0        83       966        98
VIS    2025250    200200   21.5800  148.3000       7.8        82       954        98
VIS    2025250    200200   21.5900  148.2800       8.2        83       921        99
VIS    2025250    200200   21.5900  148.2600       8.4        85       921        99
VIS    2025250    200200   21.6000  148.2400       8.5        85       930        97
VIS    2025250    200200   21.6000  148.2100       7.7        84       914        94
VIS    2025250    200200   21.5800  148.1700       8.3        90       897        98
VIS    2025250    200200   21.5800  148.1600       8.3        90       897        97
VIS    2025250    200200   21.6000  148.1200       8.9        81       919        98
VIS    2025250    200200   21.6000  148.0900       8.4        80       908        96
VIS    2025250    200200   21.5900  147.9200       7.2        95       853        90
VIS    2025250    200200   21.6000  147.9100       7.2        95       857        91
VIS    2025250    200200   21.5800  147.8700       8.0       103       702        95
VIS    2025250    200200   21.5800  147.8400       8.8       105       719        96
VIS    2025250    200200   21.5900  147.8200       8.8       112       732        98
VIS    2025250    200200   21.6000  147.8100       8.7       113       727        97
VIS    2025250    200200   21.5800  147.7700       8.6       106       855        97
VIS    2025250    200200   21.5800  147.7500       8.1       100       786        97
VIS    2025250    200200   21.5800  147.7100       8.8        90       784        94
VIS    2025250    200200   21.5900  147.7100       8.9        90       783        94
VIS    2025250    200200   21.5700  147.6600       9.4        85       848        95
VIS    2025250    200200   21.5700  147.6600       9.2        85       848        95
VIS    2025250    200200   21.5900  147.4600       8.3        86       765        92
VIS    2025250    200200   21.5700  147.4400       8.6        86       777        92
VIS    2025250    200200   21.5700  147.4300       9.0        86       820        92
VIS    2025250    200200   21.5900  147.3000      12.6        91       983        96
VIS    2025250    200200   21.5800  146.8300      10.8        86       990        96
VIS    2025250    200200   21.5800  146.8100      10.7        86       963        91
VIS    2025250    200200   21.5600  146.8000       9.3        89       890        97
VIS    2025250    200200   21.5700  146.7600       7.8        99       803        93
VIS    2025250    200200   21.5600  146.6900      12.1        84       962        97
VIS    2025250    200200   21.5700  146.6700      11.2        88       962        94
VIS    2025250    200200   21.5700  146.6400       8.8        91       950        91
VIS    2025250    200200   21.5700  146.6200       8.7        95       814        94
VIS    2025250    200200   21.5800  146.6000       8.8        93       741        93
VIS    2025250    200200   21.5700  146.5700       9.9       103       708        95
VIS    2025250    200200   21.5600  146.5300      10.6       104       711        94
VIS    2025250    200200   21.5700  146.5300      10.5       104       714        95
VIS    2025250    200200   21.5600  146.5000      10.7       109       709        94
VIS    2025250    200200   21.5600  146.4700      10.5       104       726        96
VIS    2025250    200200   21.5600  146.4400      10.7        97       742        92
VIS    2025250    200200   21.5800  146.3800      13.8        88       906        98
VIS    2025250    200200   21.5700  146.3600      14.7        87       925        99
VIS    2025250    200200   21.5600  146.3300      15.2        88       943        98
VIS    2025250    200200   21.5600  146.3100      15.2        88       939        98
VIS    2025250    200200   21.5700  146.2900      15.1        87       932        98
VIS    2025250    200200   21.5600  146.2700      14.8        82       928        99
VIS    2025250    200200   21.5600  146.2300      15.7        86       928        97
VIS    2025250    200200   21.5700  146.2200      15.8        86       932        97
VIS    2025250    200200   21.5600  146.1900      15.8        85       934        97
VIS    2025250    200200   21.5600  146.1700      16.0        85       929        97
VIS    2025250    200200   21.5600  146.1500      15.9        85       926        97
VIS    2025250    200200   21.5800  146.1200      14.9        85       926        99
VIS    2025250    200200   21.5700  146.0900      12.9        80       914        96
VIS    2025250    200200   21.5600  146.0700      11.6        81       915        98
VIS    2025250    200200   21.5800  146.0400      11.7        79       892        96
VIS    2025250    200200   21.5700  146.0100      14.3        81       880        92
VIS    2025250    200200   21.5600  146.0000      13.7        84       880        94
VIS    2025250    200200   21.5500  145.9700      12.4        94       873        94
VIS    2025250    200200   21.5700  145.9500       9.9       109       799        96
VIS    2025250    200200   21.5700  145.9100       9.7       114       745        97
VIS    2025250    200200   21.5600  145.9000       9.8       111       745        98
VIS    2025250    200200   21.5500  145.8500      11.3        90       853        93
VIS    2025250    200200   21.5500  145.8500      11.5        89       853        93
VIS    2025250    200200   21.5500  145.8100      13.7        84       888        96
VIS    2025250    200200   21.5500  145.7800      15.0        80       888        92
VIS    2025250    200200   21.5500  145.7700      14.6        80       888        93
VIS    2025250    200200   21.5600  145.7500      13.8        81       876        92
VIS    2025250    200200   21.5700  145.7300      13.7        82       872        91
VIS    2025250    200200   21.5700  145.7000      13.4        85       869        91
VIS    2025250    200200   21.5500  145.6600      14.4        83       921        97
VIS    2025250    200200   21.5700  145.6400      13.7        84       884        91
VIS    2025250    200200   21.5700  145.6300      13.2        85       908        98
VIS    2025250    200200   21.5500  145.5800      14.2        82       962        99
VIS    2025250    200200   21.5500  145.5700      14.3        82       948        99
VIS    2025250    200200   21.5500  145.5400      14.8        84       946        99
VIS    2025250    200200   21.5500  145.5200      14.8        86       924        99
VIS    2025250    200200   21.5600  145.4900      13.7        88       899        99
VIS    2025250    200200   21.5500  145.4600      13.1        93       775        91
VIS    2025250    200200   21.5600  145.4400      13.1        93       756        90
VIS    2025250    200200   21.5500  144.5600      13.8        90       865        91
VIS    2025250    200200   21.5600  144.5300      12.9        93       873        96
VIS    2025250    200200   21.5400  144.5100      14.1        90       874        92
VIS    2025250    200200   21.5400  144.5000      14.4        89       873        92
VIS    2025250    200200   21.5400  144.4700      15.2        89       877        91
VIS    2025250    200200   21.5600  144.4400      13.7        91       881        95
VIS    2025250    200200   21.5400  144.4200      13.7        87       883        94
VIS    2025250    200200   21.5600  144.4000      13.6        89       881        95
VIS    2025250    200200   21.5500  144.3600      14.6        90       875        92
VIS    2025250    200200   21.5500  143.3000      14.4        86       920        95
VIS    2025250    200200   21.5500  143.2900      14.3        86       921        95
VIS    2025250    200200   21.5300  143.2600      14.6        87       921        96
VIS    2025250    200200   21.5500  143.2200      14.3        87       924        95
VIS    2025250    200200   21.5500  143.1900      13.8        88       923        94
VIS    2025250    200200   21.5500  143.1900      13.7        88       923        94
VIS    2025250    200200   21.5500  143.1400      13.6        88       923        96
VIS    2025250    200200   21.5400  143.1400      13.4        88       924        97
VIS    2025250    200200   21.5300  143.1000      13.0        90       927        98
VIS    2025250    200200   21.5400  143.0900      13.2        89       927        97
VIS    2025250    200200   21.5400  143.0500      14.3        91       927        95
VIS    2025250    200200   21.5500  143.0400      14.7        92       927        94
VIS    2025250    200200   21.5300  142.9900      13.8        91       945        99
VIS    2025250    200200   21.5300  142.9800      13.6        90       945        99
VIS    2025250    200200   21.5300  142.9500      13.7        87       950        99
VIS    2025250    200200   21.5300  142.9400      13.8        88       950        99
VIS    2025250    200200   21.5400  142.9200      13.8        89       954        98
VIS    2025250    200200   21.5500  142.8700      14.0        88       971        95
VIS    2025250    200200   21.5400  142.8400      13.7        88       966        98
VIS    2025250    200200   21.5300  142.7900      12.5        89       947        99
VIS    2025250    200200   21.5400  142.7400      13.3        89       939        98
VIS    2025250    200200   21.5300  142.7100      13.2        86       937        97
VIS    2025250    200200   21.5500  142.6700      12.9        85       926        97
VIS    2025250    200200   21.5500  142.6700      13.1        84       925        97
VIS    2025250    200200   21.5300  142.6400      14.6        86       920        92
VIS    2025250    200200   21.5300  142.6000      13.6        87       917        91
VIS    2025250    200200   21.5300  142.5900      12.6        87       917        96
VIS    2025250    200200   21.5300  142.5600      11.3        88       920        97
VIS    2025250    200200   21.5400  142.5400      11.4        89       920        98
VIS    2025250    200200   21.5300  142.5000      11.8        93       933        99
VIS    2025250    200200   21.5300  142.5000      11.8        92       933        99
VIS    2025250    200200   21.5400  142.4700      11.0        95       945        92
VIS    2025250    200200   21.5400  142.4400      10.3        93       943        94
VIS    2025250    200200   21.5300  142.4100      10.7        90       939        99
VIS    2025250    200200   21.6000  149.9700      10.6        88       946        92
VIS    2025250    200200   21.5800  149.9600      10.6        91       944        92
VIS    2025250    200200   21.5900  149.9200      10.7        87       944        92
VIS    2025250    200200   21.5900  149.9100      10.6        88       944        92
VIS    2025250    200200   21.5900  149.5000      10.6        83       939        93
VIS    2025250    200200   21.5800  149.4800      10.0        84       931        95
VIS    2025250    200200   21.5800  149.4500       8.3        82       884        98
VIS    2025250    200200   21.5700  149.4400       7.7        83       884        99
VIS    2025250    200200   21.5800  149.4200       8.1        84       889        98
VIS    2025250    200200   21.5700  149.3900       8.5        78       934        96
VIS    2025250    200200   21.5800  149.3200       6.5        74       953        98
VIS    2025250    200200   21.5900  149.3200       6.6        74       952        97
VIS    2025250    200200   21.5800  149.2900       8.0        76       948        96
VIS    2025250    200200   21.5700  149.2500       7.3        82       952        99
VIS    2025250    200200   21.5800  149.2300       7.4        81       948        99
VIS    2025250    200200   21.5800  149.2200       7.8        78       954       100
VIS    2025250    200200   21.5700  149.1900       8.2        84       916        99
VIS    2025250    200200   21.5700  149.1700       8.0        86       916        98
VIS    2025250    200200   21.5700  149.1400       7.7        84       900        99
VIS    2025250    200200   21.5700  149.0900       7.6        81       890        99
VIS    2025250    200200   21.5800  149.0900       7.5        77       890        98
VIS    2025250    200200   21.5900  149.0700       7.2        78       885        95
VIS    2025250    200200   21.5800  149.0300       7.2        87       886        99
VIS    2025250    200200   21.5700  149.0100       7.8        95       887        97
VIS    2025250    200200   21.5600  148.9600       8.3        99       889        90
VIS    2025250    200200   21.5800  148.9200       8.4        82       889        96
VIS    2025250    200200   21.5700  148.9000       8.2        83       891        97
VIS    2025250    200200   21.5800  148.8700       8.5        82       892        95
VIS    2025250    200200   21.5800  148.8600       8.5        82       892        95
VIS    2025250    200200   21.5800  148.8200       8.2        90       890        94
VIS    2025250    200200   21.5800  148.8100       8.2        90       890        95
VIS    2025250    200200   21.5800  148.7800       7.9        93       890        97
VIS    2025250    200200   21.5600  148.7400       8.2        89       887        98
VIS    2025250    200200   21.5800  148.7100       8.1        82       876        97
VIS    2025250    200200   21.5800  148.7100       8.0        80       890        98
VIS    2025250    200200   21.5800  148.6700       9.3        78       903        97
VIS    2025250    200200   21.5600  148.6600       9.1        77       903        95
VIS    2025250    200200   21.5800  148.4900       8.8        81       964        99
VIS    2025250    200200   21.5700  148.4700       9.1        81       956        96
VIS    2025250    200200   21.5700  148.4100       8.7        80       959        99
VIS    2025250    200200   21.5800  148.3800       7.7        79       952        94
VIS    2025250    200200   21.5700  148.3100       7.9        83       954        97
VIS    2025250    200200   21.5700  148.3000       7.7        82       954        96
VIS    2025250    200200   21.5800  148.2800       7.9        82       932        97
VIS    2025250    200200   21.5600  148.2400       8.9        83       936        98
VIS    2025250    200200   21.5700  148.2100       8.5        84       906        99
VIS    2025250    200200   21.5600  148.2000       8.7        87       906        99
VIS    2025250    200200   21.5700  148.1700       8.4        90       897        98
VIS    2025250    200200   21.5600  148.1500       8.0        89       931        95
VIS    2025250    200200   21.5700  148.1100       7.4        82       908        94
VIS    2025250    200200   21.5500  148.0100       6.2        88       848        90
VIS    2025250    200200   21.5700  147.9500       7.2        79       853        91
VIS    2025250    200200   21.5600  147.9000       8.3       108       702        96
VIS    2025250    200200   21.5600  147.8900       8.3       107       702        96
VIS    2025250    200200   21.5700  147.8500       8.6       103       707        94
VIS    2025250    200200   21.5700  147.8400       9.0       106       722        95
VIS    2025250    200200   21.5600  147.8100       9.4       108       825        97
VIS    2025250    200200   21.5500  147.7800       8.6       101       888        98
VIS    2025250    200200   21.5700  147.7600       8.1       100       855        99
VIS    2025250    200200   21.5700  147.7500       7.9        95       787        95
VIS    2025250    200200   21.5500  147.7000       9.4        87       805        93
VIS    2025250    200200   21.5600  147.7000       9.7        86       810        92
VIS    2025250    200200   21.5700  147.6700       9.6        85       858        96
VIS    2025250    200200   21.5500  147.6300       8.9        82       750        90
VIS    2025250    200200   21.5600  147.4500       8.3        87       765        93
VIS    2025250    200200   21.5700  147.4400       8.4        87       776        93
VIS    2025250    200200   21.5500  147.2800       9.4       106       967        90
VIS    2025250    200200   21.5400  146.8500       9.6        89       977        93
VIS    2025250    200200   21.5400  146.8200       9.1        88       972        91
VIS    2025250    200200   21.5600  146.8100       9.3        88       928        95
VIS    2025250    200200   21.5400  146.7900       8.5        87       827        92
VIS    2025250    200200   21.5500  146.7500       8.0        95       827        92
VIS    2025250    200200   21.5600  146.7200      10.7        83       936        94
VIS    2025250    200200   21.5600  146.7100      12.1        82       962        97
VIS    2025250    200200   21.5400  146.6700      10.5        87       962        96
VIS    2025250    200200   21.5400  146.6500       9.3        95       814        94
VIS    2025250    200200   21.5500  146.6300       9.0        98       783        95
VIS    2025250    200200   21.5400  146.6100       9.7       104       703        96
VIS    2025250    200200   21.5400  146.5700      11.1       107       703        93
VIS    2025250    200200   21.5400  146.5600      11.2       106       708        93
VIS    2025250    200200   21.5600  146.5400      10.8       104       711        93
VIS    2025250    200200   21.5400  146.4900      10.9       109       722        93
VIS    2025250    200200   21.5300  146.4600      10.8        99       742        94
VIS    2025250    200200   21.5500  146.4400      11.1        97       742        91
VIS    2025250    200200   21.5500  146.4000      13.7        88       906        97
VIS    2025250    200200   21.5300  146.3600      15.1        86       945        98
VIS    2025250    200200   21.5300  146.3500      15.1        86       945        98
VIS    2025250    200200   21.5500  146.3300      15.1        87       943        98
VIS    2025250    200200   21.5500  146.3100      15.1        87       940        98
VIS    2025250    200200   21.5500  146.2800      15.0        82       932        99
VIS    2025250    200200   21.5300  146.2400      15.7        85       928        97
VIS    2025250    200200   21.5400  146.2200      15.7        87       929        97
VIS    2025250    200200   21.5400  146.1900      14.6        84       927        99
VIS    2025250    200200   21.5500  146.1700      15.7        85       927        97
VIS    2025250    200200   21.5400  146.1400      15.3        85       922        98
VIS    2025250    200200   21.5300  146.1300      14.1        85       922        98
VIS    2025250    200200   21.5500  146.1100      13.8        82       922        98
VIS    2025250    200200   21.5500  146.0700      11.6        82       915        98
VIS    2025250    200200   21.5400  146.0400      10.6        80       910        94
VIS    2025250    200200   21.5500  146.0200      12.5        78       890        94
VIS    2025250    200200   21.5300  146.0000      14.3        79       890        91
VIS    2025250    200200   21.5400  145.9800      13.7        86       888        95
VIS    2025250    200200   21.5500  145.9300      10.7       104       830        97
VIS    2025250    200200   21.5300  145.8900      12.7        89       843        90
VIS    2025250    200200   21.5300  145.8700      12.7        89       853        91
VIS    2025250    200200   21.5400  145.8400      12.2        87       886        98
VIS    2025250    200200   21.5400  145.8200      12.9        85       888        97
VIS    2025250    200200   21.5300  145.7900      15.0        81       888        93
VIS    2025250    200200   21.5300  145.7800      15.1        81       888        92
VIS    2025250    200200   21.5400  145.7500      14.7        79       888        92
VIS    2025250    200200   21.5500  145.7300      14.5        79       886        92
VIS    2025250    200200   21.5400  145.7000      14.4        79       889        92
VIS    2025250    200200   21.5300  145.6800      14.5        81       921        98
VIS    2025250    200200   21.5500  145.6600      14.5        83       921        97
VIS    2025250    200200   21.5300  145.6100      13.3        85       937        99
VIS    2025250    200200   21.5400  145.6000      13.8        84       962        99
VIS    2025250    200200   21.5300  145.5800      14.4        83       926        99
VIS    2025250    200200   21.5300  145.5500      14.8        85       917        98
VIS    2025250    200200   21.5300  145.5100      15.2        86       919        98
VIS    2025250    200200   21.5400  145.5100      15.0        86       919        98
VIS    2025250    200200   21.5400  145.4600      13.2        93       775        91
VIS    2025250    200200   21.5200  145.3900      13.0        97       714        90
VIS    2025250    200200   21.5200  145.3700      12.0       101       724        95
VIS    2025250    200200   21.5200  145.3500      11.3       104       702        96
VIS    2025250    200200   21.5200  144.6000      15.2        86       876        90
VIS    2025250    200200   21.5300  144.5500      13.1        91       876        94
VIS    2025250    200200   21.5200  144.5200      13.5        90       873        93
VIS    2025250    200200   21.5300  144.5000      14.4        90       876        93
VIS    2025250    200200   21.5200  144.4900      14.8        90       877        92
VIS    2025250    200200   21.5300  144.4600      14.8        89       879        92
VIS    2025250    200200   21.5300  144.4300      14.2        88       883        94
VIS    2025250    200200   21.5300  144.4100      13.7        88       882        94
VIS    2025250    200200   21.5300  144.3700      13.7        88       875        92
VIS    2025250    200200   21.5200  144.3400      13.9        87       875        91
VIS    2025250    200200   21.5100  144.3300      14.2        87       876        90
VIS    2025250    200200   21.5100  143.8900      13.3        94       889        95
VIS    2025250    200200   21.5100  143.8600      10.9       111       874        97
VIS    2025250    200200   21.5100  143.2900      13.9        88       916        96
VIS    2025250    200200   21.5100  143.2500      14.4        87       919        95
VIS    2025250    200200   21.5100  143.2500      14.4        87       919        95
VIS    2025250    200200   21.5100  143.2200      14.3        88       919        95
VIS    2025250    200200   21.5100  143.2000      14.2        88       919        94
VIS    2025250    200200   21.5200  143.1700      13.7        88       920        95
VIS    2025250    200200   21.5100  143.1300      13.7        89       925        96
VIS    2025250    200200   21.5100  143.1200      13.7        89       927        96
VIS    2025250    200200   21.5000  143.0900      13.7        90       928        97
VIS    2025250    200200   21.5000  143.0600      13.3        89       928        98
VIS    2025250    200200   21.5100  143.0300      13.3        90       928        98
VIS    2025250    200200   21.5000  143.0000      13.7        89       951        99
VIS    2025250    200200   21.5000  142.9900      13.7        89       960        99
VIS    2025250    200200   21.5100  142.9500      13.6        88       960        99
VIS    2025250    200200   21.5000  142.9500      13.5        88       970        99
VIS    2025250    200200   21.5200  142.8000      12.9        88       947        99
VIS    2025250    200200   21.5200  142.7700      13.0        88       959        98
VIS    2025250    200200   21.5100  142.7100      13.3        84       937        96
VIS    2025250    200200   21.5100  142.7000      13.2        84       937        95
VIS    2025250    200200   21.5000  142.6800      13.4        86       934        96
VIS    2025250    200200   21.5200  142.6400      14.2        85       920        93
VIS    2025250    200200   21.5000  142.6100      12.2        84       920        94
VIS    2025250    200200   21.5200  142.5800      11.5        86       920        95
VIS    2025250    200200   21.5000  142.5700      11.5        87       923        94
VIS    2025250    200200   21.5100  142.5300      11.8        90       930        99
VIS    2025250    200200   21.5200  142.5300      11.8        91       924        99
VIS    2025250    200200   21.5000  142.4900      11.2        95       945        97
VIS    2025250    200200   21.5000  142.4600      10.8        94       943        92
VIS    2025250    200200   21.5000  142.4500      10.8        93       943        92
VIS    2025250    200200   21.5100  142.4300      10.4        91       938        96
VIS    2025250    200200   21.5000  142.4000      10.9        90       938       100
VIS    2025250    200200   21.5500  149.9700      10.8        88       930        93
VIS    2025250    200200   21.5500  149.9400      10.8        88       930        94
VIS    2025250    200200   21.5600  149.9300      10.7        89       930        94
VIS    2025250    200200   21.5500  149.9000      10.6        90       927        94
VIS    2025250    200200   21.5600  149.5300      10.2        82       974        91
VIS    2025250    200200   21.5500  149.4800       9.8        83       931        95
VIS    2025250    200200   21.5500  149.4700       9.1        82       896        97
VIS    2025250    200200   21.5700  149.4400       7.8        83       884        99
VIS    2025250    200200   21.5500  149.4200       7.9        84       908        98
VIS    2025250    200200   21.5500  149.4000       8.7        81       912        98
VIS    2025250    200200   21.5400  149.3600       8.1        78       949        98
VIS    2025250    200200   21.5400  149.3300       7.1        81       935        99
VIS    2025250    200200   21.5500  149.3200       7.1        79       935        99
VIS    2025250    200200   21.5500  149.3000       7.7        79       938        99
VIS    2025250    200200   21.5500  149.2600       7.7        85       920        99
VIS    2025250    200200   21.5600  149.2300       7.6        84       920       100
VIS    2025250    200200   21.5500  149.2000       8.5        86       907        97
VIS    2025250    200200   21.5600  149.1900       8.5        85       907        98
VIS    2025250    200200   21.5500  149.1500       8.2        90       909        97
VIS    2025250    200200   21.5400  149.1200       7.7        90       901        98
VIS    2025250    200200   21.5400  149.1100       7.5        90       890        99
VIS    2025250    200200   21.5400  149.0900       7.3        91       884        99
VIS    2025250    200200   21.5500  149.0700       7.5        91       884        98
VIS    2025250    200200   21.5500  149.0400       8.1        93       884        98
VIS    2025250    200200   21.5600  149.0200       7.9        94       887        97
VIS    2025250    200200   21.5500  148.9700       8.3        95       890        92
VIS    2025250    200200   21.5400  148.9600       8.1        89       889        96
VIS    2025250    200200   21.5400  148.9300       8.4        97       891        96
VIS    2025250    200200   21.5600  148.9000       8.2        88       891        97
VIS    2025250    200200   21.5400  148.8800       9.1        86       892        93
VIS    2025250    200200   21.5500  148.8400       9.0        88       892        92
VIS    2025250    200200   21.5600  148.8400       8.8        89       892        92
VIS    2025250    200200   21.5400  148.7900       8.0        91       891        98
VIS    2025250    200200   21.5500  148.7700       8.2        92       890        98
VIS    2025250    200200   21.5500  148.7600       8.3        89       888        98
VIS    2025250    200200   21.5500  148.7200       8.3        83       868        96
VIS    2025250    200200   21.5600  148.7100       8.3        81       868        95
VIS    2025250    200200   21.5400  148.6700       8.3        79       883        98
VIS    2025250    200200   21.5500  148.4100       9.3        79       983        97
VIS    2025250    200200   21.5500  148.4000       8.6        78       970        95
VIS    2025250    200200   21.5400  148.3600       7.7        78       970        91
VIS    2025250    200200   21.5500  148.3300       7.9        83       957        90
VIS    2025250    200200   21.5500  148.3000       7.8        83       954        96
VIS    2025250    200200   21.5300  148.2700       8.6        81       972        99
VIS    2025250    200200   21.5300  148.2400       9.1        82       963        98
VIS    2025250    200200   21.5300  148.2200       8.9        84       943        97
VIS    2025250    200200   21.5400  148.2000       8.6        88       903        99
VIS    2025250    200200   21.5300  148.1600       8.2        87       908        98
VIS    2025250    200200   21.5300  148.1400       8.0        82       922        96
VIS    2025250    200200   21.5300  148.1100       7.7        78       908        97
VIS    2025250    200200   21.5300  148.0900       7.8        96       884        98
VIS    2025250    200200   21.5400  147.9700       7.3        93       819        92
VIS    2025250    200200   21.5400  147.8700       9.3       104       722        92
VIS    2025250    200200   21.5500  147.8500       9.0       103       726        91
VIS    2025250    200200   21.5400  147.8200       9.0       104       873        97
VIS    2025250    200200   21.5300  147.7800       8.4        95       894        98
VIS    2025250    200200   21.5400  147.7800       8.4        96       894        98
VIS    2025250    200200   21.5200  147.7500       8.4        96       818        97
VIS    2025250    200200   21.5400  147.7200       8.9        91       787        94
VIS    2025250    200200   21.5200  147.6800      10.4        85       830        92
VIS    2025250    200200   21.5200  147.5000       8.0        81       744        90
VIS    2025250    200200   21.5300  147.4800       8.4        82       776        91
VIS    2025250    200200   21.5300  147.4700       8.5        83       776        91
VIS    2025250    200200   21.5300  147.4500       9.1        85       832        90
VIS    2025250    200200   21.5400  147.2800       9.6       104       967        90
VIS    2025250    200200   21.5100  146.8900       9.5        98       959        91
VIS    2025250    200200   21.5200  146.8800       9.7        95       959        93
VIS    2025250    200200   21.5300  146.8400       9.5        89       977        92
VIS    2025250    200200   21.5100  146.7900       9.0        81       928        91
VIS    2025250    200200   21.5200  146.7600       8.7        83       890        93
VIS    2025250    200200   21.5300  146.7400       9.1        89       932        91
VIS    2025250    200200   21.5300  146.7200      10.2        87       957        94
VIS    2025250    200200   21.5300  146.6900      10.6        84       962        95
VIS    2025250    200200   21.5300  146.6700       9.2        87       962        92
VIS    2025250    200200   21.5100  146.6300       9.8       104       701        95
VIS    2025250    200200   21.5200  146.5600      11.1       105       704        93
VIS    2025250    200200   21.5100  146.5400      10.3       101       709        93
VIS    2025250    200200   21.5200  146.5300      10.6       103       709        93
VIS    2025250    200200   21.5100  146.4800      11.4        92       745        90
VIS    2025250    200200   21.5300  146.4600      10.9        97       745        93
VIS    2025250    200200   21.5300  146.4500      11.6        90       745        90
VIS    2025250    200200   21.5100  146.4100      14.4        85       932        99
VIS    2025250    200200   21.5200  146.3900      15.1        86       932        97
VIS    2025250    200200   21.5300  146.3600      15.2        85       948        98
VIS    2025250    200200   21.5300  146.3400      15.1        85       952        99
VIS    2025250    200200   21.5200  146.3200      15.2        84       952        99
VIS    2025250    200200   21.5200  146.2900      15.3        82       939        99
VIS    2025250    200200   21.5300  146.2700      15.2        81       930        98
VIS    2025250    200200   21.5200  146.2400      15.8        86       928        97
VIS    2025250    200200   21.5200  146.2300      15.8        86       928        97
VIS    2025250    200200   21.5100  146.2000      14.5        84       924        99
VIS    2025250    200200   21.5100  146.1800      13.3        83       917       100
VIS    2025250    200200   21.5200  146.1400      13.4        85       922        99
VIS    2025250    200200   21.5000  146.1100      11.1        87       915        93
VIS    2025250    200200   21.5200  146.0800      11.0        82       915        95
VIS    2025250    200200   21.5000  146.0400      13.6        79       890        95
VIS    2025250    200200   21.5200  146.0100      13.3        78       890        94
VIS    2025250    200200   21.5200  145.9900      14.5        79       890        91
VIS    2025250    200200   21.5000  145.9800      14.4        80       892        94
VIS    2025250    200200   21.5000  145.9100      14.3        88       878        94
VIS    2025250    200200   21.5200  145.9000      13.4        91       857        92
VIS    2025250    200200   21.5200  145.8400      13.2        88       886        97
VIS    2025250    200200   21.5200  145.7600      15.0        80       897        94
VIS    2025250    200200   21.5000  145.7500      15.1        82       903        95
VIS    2025250    200200   21.5200  145.7300      14.7        81       903        95
VIS    2025250    200200   21.5200  145.7000      14.5        82       906        97
VIS    2025250    200200   21.5100  145.6700      14.3        83       922        98
VIS    2025250    200200   21.5000  145.6300      13.2        85       922        98
VIS    2025250    200200   21.5200  145.6300      12.9        86       937        96
VIS    2025250    200200   21.5000  145.5900      15.0        84       913        97
VIS    2025250    200200   21.5200  145.5700      14.8        85       917        98
VIS    2025250    200200   21.5200  145.5400      14.9        87       915        98
VIS    2025250    200200   21.5000  145.5200      14.9        87       882        94
VIS    2025250    200200   21.5200  145.4900      14.8        88       865        91
VIS    2025250    200200   21.5200  145.3900      12.9        97       724        91
VIS    2025250    200200   21.5000  145.3700      11.8        99       724        94
VIS    2025250    200200   21.5000  145.3500      11.9        98       704        91
VIS    2025250    200200   21.5000  144.6100      15.3        87       887        92
VIS    2025250    200200   21.5000  144.5900      15.1        85       876        90
VIS    2025250    200200   21.5100  144.5800      14.9        85       876        90
VIS    2025250    200200   21.5100  144.5600      13.5        94       872        91
VIS    2025250    200200   21.5000  144.5200      14.7        90       872        91
VIS    2025250    200200   21.5000  144.5000      14.7        91       873        92
VIS    2025250    200200   21.4900  144.4700      14.2        93       877        94
VIS    2025250    200200   21.5000  144.4500      15.0        91       882        93
VIS    2025250    200200   21.4900  144.4200      15.2        90       880        92
VIS    2025250    200200   21.5000  144.4000      13.8        89       880        93
VIS    2025250    200200   21.5000  144.3600      14.1        87       879        92
VIS    2025250    200200   21.5000  144.3600      14.3        87       879        92
VIS    2025250    200200   21.5100  144.2800      14.8        92       877        90
VIS    2025250    200200   21.5100  144.2500      12.2       101       869        91
VIS    2025250    200200   21.4900  144.2300      10.8       107       845        92
VIS    2025250    200200   21.5000  144.0500      11.2       105       865        95
VIS    2025250    200200   21.5000  144.0300      12.4        97       872        90
VIS    2025250    200200   21.5000  143.9900      13.6        97       870        93
VIS    2025250    200200   21.5000  143.9800      14.6        93       870        90
VIS    2025250    200200   21.4900  143.9400      15.0        90       887        92
VIS    2025250    200200   21.4800  143.9300      15.2        90       895        92
VIS    2025250    200200   21.5000  143.9100      14.4        88       892        92
VIS    2025250    200200   21.4800  143.8700      12.6       102       892        97
VIS    2025250    200200   21.5000  143.8600      11.6       107       889        95
VIS    2025250    200200   21.4900  143.8200      11.5       109       874       100
VIS    2025250    200200   21.4800  143.7900      11.7       100       896        98
VIS    2025250    200200   21.4800  143.2700      14.1        87       916        96
VIS    2025250    200200   21.5000  143.2500      14.3        87       919        96
VIS    2025250    200200   21.4800  143.2200      14.2        88       916        94
VIS    2025250    200200   21.4800  143.2100      14.2        88       916        94
VIS    2025250    200200   21.4800  143.1900      14.5        87       918        94
VIS    2025250    200200   21.4800  143.1500      13.6        87       924        94
VIS    2025250    200200   21.4900  143.1400      13.8        86       924        95
VIS    2025250    200200   21.5000  143.1000      13.9        90       928        96
VIS    2025250    200200   21.5000  143.0900      13.9        90       928        96
VIS    2025250    200200   21.5000  143.0700      13.5        89       928        98
VIS    2025250    200200   21.5000  143.0400      13.3        89       928        97
VIS    2025250    200200   21.4900  143.0000      13.7        88       960        99
VIS    2025250    200200   21.4900  142.9900      13.6        89       969        99
VIS    2025250    200200   21.4800  142.9600      13.7        89       976        99
VIS    2025250    200200   21.4800  142.7900      14.2        89       993        91
VIS    2025250    200200   21.5000  142.6800      13.4        86       934        96
VIS    2025250    200200   21.4900  142.6400      12.7        85       924        96
VIS    2025250    200200   21.4800  142.6200      11.8        86       924        97
VIS    2025250    200200   21.4900  142.5900      11.8        87       928        96
VIS    2025250    200200   21.4800  142.5700      12.1        89       936        96
VIS    2025250    200200   21.4800  142.5300      11.8        93       965        99
VIS    2025250    200200   21.4700  142.5100      11.5        94       964        98
VIS    2025250    200200   21.4700  142.4800      11.3        93       961        96
VIS    2025250    200200   21.4800  142.4700      10.9        95       945        95
VIS    2025250    200200   21.4700  142.4400      11.1        89       937        97
VIS    2025250    200200   21.4700  142.4100      11.1        89       938        99
VIS    2025250    200200   21.5500  149.9700      10.7        88       930        92
VIS    2025250    200200   21.5300  149.9500      10.7        86       934        92
VIS    2025250    200200   21.5300  149.9200      11.1        90       923        94
VIS    2025250    200200   21.5500  149.9000      10.7        91       923        94
VIS    2025250    200200   21.5300  149.8800      10.8        90       920        95
VIS    2025250    200200   21.5300  149.5100      10.2        85       962        91
VIS    2025250    200200   21.5400  149.4800      10.0        83       938        94
VIS    2025250    200200   21.5300  149.4700       9.1        84       896        97
VIS    2025250    200200   21.5300  149.4400       8.2        85       894        99
VIS    2025250    200200   21.5300  149.4200       8.2        87       894        99
VIS    2025250    200200   21.5400  149.4000       8.6        84       909        98
VIS    2025250    200200   21.5300  149.3800       8.8        84       931        98
VIS    2025250    200200   21.5200  149.3500       8.0        81       944        98
VIS    2025250    200200   21.5400  149.3300       7.2        83       935        99
VIS    2025250    200200   21.5200  149.2800       7.3        80       931       100
VIS    2025250    200200   21.5300  149.2500       8.1        87       910       100
VIS    2025250    200200   21.5200  149.2500       8.4        89       903       100
VIS    2025250    200200   21.5200  149.2000       8.5        92       901        96
VIS    2025250    200200   21.5200  149.2000       8.5        91       901        96
VIS    2025250    200200   21.5200  149.1600       8.4        91       906        97
VIS    2025250    200200   21.5200  149.1300       7.9        92       909        97
VIS    2025250    200200   21.5300  149.1100       7.6        92       901        98
VIS    2025250    200200   21.5400  149.0900       7.3        92       885        99
VIS    2025250    200200   21.5300  149.0700       7.6        96       884        97
VIS    2025250    200200   21.5100  149.0200       8.3        93       885        98
VIS    2025250    200200   21.5200  149.0000       8.1        90       887        98
VIS    2025250    200200   21.5100  148.9800       7.9        86       889        96
VIS    2025250    200200   21.5300  148.9700       8.0        87       889        97
VIS    2025250    200200   21.5300  148.9200       8.7        98       891        95
VIS    2025250    200200   21.5200  148.9000       9.1        93       892        95
VIS    2025250    200200   21.5100  148.8700       9.9        82       893        91
VIS    2025250    200200   21.5100  148.8700       9.9        81       893        90
VIS    2025250    200200   21.5300  148.8200       8.6        89       892        95
VIS    2025250    200200   21.5100  148.7900       8.0        83       892        98
VIS    2025250    200200   21.5300  148.7900       7.9        87       891        99
VIS    2025250    200200   21.5200  148.7500       8.5        85       890        97
VIS    2025250    200200   21.5200  148.7200       8.8        90       868        99
VIS    2025250    200200   21.5200  148.7100       8.8        89       868        99
VIS    2025250    200200   21.5100  148.6900       8.5        87       877       100
VIS    2025250    200200   21.5300  148.6600       8.3        80       883        98
VIS    2025250    200200   21.5100  148.6300       8.3        77       934        95
VIS    2025250    200200   21.5300  148.3900       8.4        76       974        98
VIS    2025250    200200   21.5100  148.3700       7.9        77       973        96
VIS    2025250    200200   21.5200  148.3500       7.9        80       963        92
VIS    2025250    200200   21.5100  148.3300       8.4        81       963        98
VIS    2025250    200200   21.5200  148.2900       8.4        82       973        99
VIS    2025250    200200   21.5000  148.2800       8.8        81       973        99
VIS    2025250    200200   21.5100  148.2400       9.1        81       963        98
VIS    2025250    200200   21.5200  148.2300       9.0        82       963        97
VIS    2025250    200200   21.5100  148.1900       8.8        86       895        99
VIS    2025250    200200   21.5100  148.1700       9.0        85       902        99
VIS    2025250    200200   21.5200  148.1600       8.3        86       908        98
VIS    2025250    200200   21.5200  148.1200       8.1        79       908        97
VIS    2025250    200200   21.5200  148.1000       8.0        88       884        97
VIS    2025250    200200   21.5200  148.0800       7.8       116       855        90
VIS    2025250    200200   21.5100  148.0500       6.9       117       848        93
VIS    2025250    200200   21.5200  148.0200       6.1        92       851        91
VIS    2025250    200200   21.5100  148.0100       6.5        95       828        94
VIS    2025250    200200   21.5100  147.9800       7.5        98       704        93
VIS    2025250    200200   21.5000  147.8900       9.2       100       743        95
VIS    2025250    200200   21.5200  147.8800       9.3       104       702        93
VIS    2025250    200200   21.5100  147.8500       8.7        95       832        98
VIS    2025250    200200   21.5000  147.8100       7.9        88       863        98
VIS    2025250    200200   21.5100  147.8000       8.0        89       863        99
VIS    2025250    200200   21.5200  147.7600       8.3        94       842        97
VIS    2025250    200200   21.5000  147.7300       8.7        95       796        96
VIS    2025250    200200   21.5000  147.7100       9.0        90       796        93
VIS    2025250    200200   21.5000  147.6800       9.5        87       818        93
VIS    2025250    200200   21.5000  147.5100       7.8        81       744        90
VIS    2025250    200200   21.5100  147.4900       7.9        79       832        91
VIS    2025250    200200   21.5100  147.4800       8.1        80       832        92
VIS    2025250    200200   21.4900  147.4500      10.0        73       949        92
VIS    2025250    200200   21.5000  146.8700       9.2        93       959        91
VIS    2025250    200200   21.4900  146.8600       9.0        93       959        91
VIS    2025250    200200   21.5000  146.8100       9.0        89       966        92
VIS    2025250    200200   21.5000  146.8100       9.0        87       949        91
VIS    2025250    200200   21.5000  146.7600       8.6        82       893        94
VIS    2025250    200200   21.4900  146.7400       8.3        90       897        95
VIS    2025250    200200   21.4900  146.7100       9.0        93       844        95
VIS    2025250    200200   21.4900  146.6900       8.6        92       805        92
VIS    2025250    200200   21.4900  146.6600       9.2        99       701        96
VIS    2025250    200200   21.5000  146.6500       9.3       100       719        96
VIS    2025250    200200   21.5000  146.5700      10.4       103       701        94
VIS    2025250    200200   21.5000  146.5500      10.4       102       702        93
VIS    2025250    200200   21.4900  146.5200      10.6        93       715        91
VIS    2025250    200200   21.4900  146.4400      13.8        80       883        92
VIS    2025250    200200   21.4900  146.4300      13.9        81       950       100
VIS    2025250    200200   21.5000  146.4100      14.2        85       947        99
VIS    2025250    200200   21.4800  146.3600      14.5        80       968       100
VIS    2025250    200200   21.4900  146.3400      14.7        82       952       100
VIS    2025250    200200   21.4900  146.3200      14.8        85       932        99
VIS    2025250    200200   21.4800  146.2900      15.1        86       916        98
VIS    2025250    200200   21.5000  146.2700      15.5        82       918        96
VIS    2025250    200200   21.4900  146.2300      15.2        83       922        98
VIS    2025250    200200   21.4900  146.2200      14.3        84       927        99
VIS    2025250    200200   21.5000  146.2000      14.0        83       924        99
VIS    2025250    200200   21.4800  146.1600      11.4        92       929        96
VIS    2025250    200200   21.4800  146.1400      12.0        85       914        96
VIS    2025250    200200   21.5000  146.1200      10.9        87       915        94
VIS    2025250    200200   21.4900  146.0900      10.9        83       910        90
VIS    2025250    200200   21.4900  146.0600      13.1        81       892        95
VIS    2025250    200200   21.4900  146.0300      14.3        79       890        90
VIS    2025250    200200   21.4800  146.0200      14.5        79       890        90
VIS    2025250    200200   21.4800  145.9900      15.0        81       895        94
VIS    2025250    200200   21.4900  145.9600      13.7        85       895        95
VIS    2025250    200200   21.5000  145.9200      14.2        86       880        94
VIS    2025250    200200   21.4900  145.7500      14.9        82       906        96
VIS    2025250    200200   21.4900  145.7200      14.8        84       906        96
VIS    2025250    200200   21.5000  145.7000      14.2        86       906        98
VIS    2025250    200200   21.4900  145.6800      14.0        86       915        99
VIS    2025250    200200   21.4900  145.6400      13.4        85       921        98
VIS    2025250    200200   21.4800  145.6200      13.8        87       897        96
VIS    2025250    200200   21.4900  145.5900      15.2        85       897        95
VIS    2025250    200200   21.4900  145.5800      15.3        85       897        94
VIS    2025250    200200   21.4900  145.5400      14.8        88       882        93
VIS    2025250    200200   21.4900  145.5300      14.8        88       882        94
VIS    2025250    200200   21.4700  145.4000      13.5        92       758        90
VIS    2025250    200200   21.4900  145.3700      12.1        98       724        93
VIS    2025250    200200   21.4800  144.6700      13.7        92       865        90
VIS    2025250    200200   21.4700  144.6400      14.1        90       871        92
VIS    2025250    200200   21.4800  144.6100      15.1        86       882        91
VIS    2025250    200200   21.4900  144.6100      15.2        86       887        92
VIS    2025250    200200   21.4900  144.5600      13.9        96       868        92
VIS    2025250    200200   21.4600  144.5500      13.5        97       860        93
VIS    2025250    200200   21.4800  144.5300      14.4        97       863        92
VIS    2025250    200200   21.4700  144.4900      13.6        94       872        95
VIS    2025250    200200   21.4800  144.4700      14.1        94       877        95
VIS    2025250    200200   21.4700  144.4400      15.3        90       881        92
VIS    2025250    200200   21.4800  144.4200      15.6        89       881        91
VIS    2025250    200200   21.4800  144.3900      14.9        87       880        92
VIS    2025250    200200   21.4700  144.3700      14.8        84       879        91
VIS    2025250    200200   21.4700  144.3400      15.1        86       879        90
VIS    2025250    200200   21.4800  144.2400      11.3       105       845        94
VIS    2025250    200200   21.4800  144.2400      11.0       106       842        95
VIS    2025250    200200   21.4800  143.9500      15.6        91       882        90
VIS    2025250    200200   21.4800  143.9400      15.4        91       895        92
VIS    2025250    200200   21.4700  143.9100      14.8        90       899        91
VIS    2025250    200200   21.4600  143.8700      12.3        98       904        99
VIS    2025250    200200   21.4700  143.8500      12.3       102       892        99
VIS    2025250    200200   21.4700  143.8400      12.7       100       891        98
VIS    2025250    200200   21.4600  143.7900      12.9        93       908        98
VIS    2025250    200200   21.4600  143.7800      13.0        92       902        98
VIS    2025250    200200   21.4600  143.7600      14.4        89       902        95
VIS    2025250    200200   21.4700  143.6400      12.5        91       876        90
VIS    2025250    200200   21.4700  143.6400      11.7        96       870        92
VIS    2025250    200200   21.4700  143.2100      14.2        88       915        94
VIS    2025250    200200   21.4700  143.1800      14.5        88       916        93
VIS    2025250    200200   21.4700  143.1500      13.9        87       923        93
VIS    2025250    200200   21.4700  143.1200      13.3        88       936        94
VIS    2025250    200200   21.4700  143.1000      13.7        91       950        93
VIS    2025250    200200   21.4600  143.0500      14.0        89       964        98
VIS    2025250    200200   21.4600  143.0500      14.0        89       964        99
VIS    2025250    200200   21.4700  143.0000      14.2        88       976        98
VIS    2025250    200200   21.4500  142.7800      11.9        95       989        98
VIS    2025250    200200   21.4600  142.7500      11.1        91       995        98
VIS    2025250    200200   21.4600  142.7500      11.3        90       995        98
VIS    2025250    200200   21.4500  142.6800      11.6        91       983        98
VIS    2025250    200200   21.4500  142.6700      11.7        91       983        99
VIS    2025250    200200   21.4700  142.6400      12.3        87       951        98
VIS    2025250    200200   21.4700  142.6100      11.4        89       951        95
VIS    2025250    200200   21.4700  142.5900      11.7        89       936        97
VIS    2025250    200200   21.4700  142.4900      11.5        92       963        98
VIS    2025250    200200   21.4600  142.4800      11.3        91       948        98
VIS    2025250    200200   21.4700  142.4200      11.3        89       938        99
VIS    2025250    200200   21.5200  149.9400      10.7        86       927        93
VIS    2025250    200200   21.5200  149.9100      10.9        90       923        94
VIS    2025250    200200   21.5100  149.8900      10.8        89       920        95
VIS    2025250    200200   21.5000  149.5300      10.0        84       962        91
VIS    2025250    200200   21.5100  149.5200      10.2        85       962        92
VIS    2025250    200200   21.5000  149.4900      10.0        88       953        93
VIS    2025250    200200   21.5000  149.4800       9.7        87       932        96
VIS    2025250    200200   21.5100  149.4400       8.6        85       887        99
VIS    2025250    200200   21.5200  149.4300       8.2        87       894        99
VIS    2025250    200200   21.5000  149.3900       8.2        85       906        99
VIS    2025250    200200   21.4900  149.3700       8.0        80       927        97
VIS    2025250    200200   21.5100  149.3500       8.0        77       944        98
VIS    2025250    200200   21.5000  149.3200       7.5        73       946        99
VIS    2025250    200200   21.5100  149.2800       7.3        80       913        99
VIS    2025250    200200   21.4900  149.2600       8.3        92       887       100
VIS    2025250    200200   21.5100  149.2400       8.8        93       903        95
VIS    2025250    200200   21.5000  149.2100       8.8        93       905        95
VIS    2025250    200200   21.5000  149.1900       8.4        91       901        97
VIS    2025250    200200   21.4900  149.1600       8.3        91       923        97
VIS    2025250    200200   21.5100  149.1300       7.9        93       915        97
VIS    2025250    200200   21.4900  149.1100       7.9        93       905        97
VIS    2025250    200200   21.5000  149.1000       7.7        93       894        98
VIS    2025250    200200   21.5100  149.0700       7.6        95       885        98
VIS    2025250    200200   21.4900  149.0500       7.9        94       885        98
VIS    2025250    200200   21.4900  149.0200       7.9        91       885        99
VIS    2025250    200200   21.5100  148.9800       7.8        86       887        96
VIS    2025250    200200   21.5000  148.9700       7.8        86       889        97
VIS    2025250    200200   21.4900  148.9200       8.4        91       896        96
VIS    2025250    200200   21.4900  148.9100       8.7        91       901        95
VIS    2025250    200200   21.4900  148.8800       9.6        85       899        93
VIS    2025250    200200   21.4900  148.8600       9.7        81       899        93
VIS    2025250    200200   21.5000  148.8400       9.3        83       894        94
VIS    2025250    200200   21.5000  148.8000       8.2        83       893        98
VIS    2025250    200200   21.5100  148.7900       8.0        83       893        98
VIS    2025250    200200   21.4900  148.7600       8.3        85       895        97
VIS    2025250    200200   21.4900  148.7300       8.6        89       880        99
VIS    2025250    200200   21.5000  148.7000       8.7        90       875        99
VIS    2025250    200200   21.5100  148.6900       8.6        88       875        99
VIS    2025250    200200   21.4800  148.6400       8.1        79       911        98
VIS    2025250    200200   21.4800  148.6400       8.1        79       913        98
VIS    2025250    200200   21.4900  148.3800       8.4        79       973        97
VIS    2025250    200200   21.5000  148.3700       8.1        79       963        96
VIS    2025250    200200   21.4900  148.3500       8.6        82       960        99
VIS    2025250    200200   21.4800  148.3100       9.0        82       974        99
VIS    2025250    200200   21.5000  148.2900       8.7        81       974        99
VIS    2025250    200200   21.4800  148.2500       9.0        79       963       100
VIS    2025250    200200   21.4800  148.2300       9.4        79       944        99
VIS    2025250    200200   21.4900  148.2200       9.3        81       911        99
VIS    2025250    200200   21.4900  148.1800       9.4        84       902        99
VIS    2025250    200200   21.4900  148.1700       9.4        82       903        99
VIS    2025250    200200   21.4900  148.1300       8.9        82       912        98
VIS    2025250    200200   21.4900  148.1200       8.7        87       901        98
VIS    2025250    200200   21.5000  148.1000       8.1       100       879        93
VIS    2025250    200200   21.4800  148.0600       5.7        92       848        94
VIS    2025250    200200   21.4800  148.0400       6.2        88       828        95
VIS    2025250    200200   21.4900  148.0100       6.6        95       765        95
VIS    2025250    200200   21.4700  147.9000       9.0        97       749        95
VIS    2025250    200200   21.4800  147.8800       9.1        93       794        94
VIS    2025250    200200   21.4800  147.8500       8.2        87       839        96
VIS    2025250    200200   21.4700  147.8300       8.0        87       853        97
VIS    2025250    200200   21.4800  147.8100       8.0        90       842        96
VIS    2025250    200200   21.4900  147.7900       8.0        91       842        96
VIS    2025250    200200   21.4900  147.7600       8.1        94       803        96
VIS    2025250    200200   21.4700  147.7200       8.3        88       794        93
VIS    2025250    200200   21.4900  147.7000       9.0        89       796        93
VIS    2025250    200200   21.4900  147.6900       9.4        87       811        93
VIS    2025250    200200   21.4900  147.5200       8.0        83       744        91
VIS    2025250    200200   21.4800  147.4700       8.8        75       911        91
VIS    2025250    200200   21.4900  147.4500       9.8        72       949        90
VIS    2025250    200200   21.4900  147.4400      11.2        70       955        95
VIS    2025250    200200   21.4700  146.8700       7.9       100       871        92
VIS    2025250    200200   21.4600  146.8600       8.4       105       871        95
VIS    2025250    200200   21.4800  146.8400       8.9        94       965        92
VIS    2025250    200200   21.4600  146.7900      10.2       105       784        98
VIS    2025250    200200   21.4600  146.7900       9.7       105       783        98
VIS    2025250    200200   21.4600  146.7400       6.6        97       790        92
VIS    2025250    200200   21.4700  146.7200       8.3        96       837        95
VIS    2025250    200200   21.4600  146.7000       8.9       100       737        97
VIS    2025250    200200   21.4600  146.6900       9.1       103       735        97
VIS    2025250    200200   21.4700  146.5200      10.7        92       715        91
VIS    2025250    200200   21.4700  146.4400      14.2        79       952        99
VIS    2025250    200200   21.4600  146.4000      12.7        81       977        99
VIS    2025250    200200   21.4600  146.3800      13.8        81       935        99
VIS    2025250    200200   21.4600  146.3500      14.8        82       906        95
VIS    2025250    200200   21.4700  146.3400      14.7        83       932        99
VIS    2025250    200200   21.4600  146.3000      15.1        87       906        96
VIS    2025250    200200   21.4600  146.2800      15.5        85       913        96
VIS    2025250    200200   21.4600  146.2400      14.5        84       922        99
VIS    2025250    200200   21.4700  146.2300      14.1        85       926       100
VIS    2025250    200200   21.4500  146.1900      11.9        90       927        99
VIS    2025250    200200   21.4600  146.1800      12.0        88       927        99
VIS    2025250    200200   21.4700  146.1600      11.6        90       927        91
VIS    2025250    200200   21.4700  146.1300      12.0        79       907        90
VIS    2025250    200200   21.4600  146.0700      14.0        82       890        95
VIS    2025250    200200   21.4500  146.0400      13.4        83       892        92
VIS    2025250    200200   21.4700  145.9700      14.5        84       908        96
VIS    2025250    200200   21.4700  145.9500      13.4        85       924        97
VIS    2025250    200200   21.4700  145.9300      12.5        87       908        91
VIS    2025250    200200   21.4600  145.7700      13.9        84       884        94
VIS    2025250    200200   21.4600  145.7500      14.5        83       896        96
VIS    2025250    200200   21.4700  145.7400      14.5        83       904        97
VIS    2025250    200200   21.4600  145.7100      14.2        84       896        96
VIS    2025250    200200   21.4700  145.6700      13.5        87       896        98
VIS    2025250    200200   21.4600  145.6600      13.4        87       891        98
VIS    2025250    200200   21.4700  145.6400      13.7        87       889        94
VIS    2025250    200200   21.4700  145.6100      13.9        89       887        94
VIS    2025250    200200   21.4700  145.5800      14.5        86       889        92
VIS    2025250    200200   21.4600  145.5500      15.6        86       884        90
VIS    2025250    200200   21.4700  145.5300      15.3        86       882        91
VIS    2025250    200200   21.4700  145.3900      13.2        93       733        90
VIS    2025250    200200   21.4700  145.3800      12.6        95       733        91
VIS    2025250    200200   21.4400  144.7100      11.1       105       841        95
VIS    2025250    200200   21.4400  144.6700      11.7        98       857        95
VIS    2025250    200200   21.4600  144.6500      13.6        93       867        93
VIS    2025250    200200   21.4600  144.6300      14.0        88       871        92
VIS    2025250    200200   21.4600  144.5700      13.1        94       858        91
VIS    2025250    200200   21.4600  144.5500      13.5        97       860        93
VIS    2025250    200200   21.4400  144.5400      12.6        99       863        96
VIS    2025250    200200   21.4400  144.5100      12.2       101       863        97
VIS    2025250    200200   21.4600  144.4900      13.0        97       868        96
VIS    2025250    200200   21.4500  144.4500      14.7        90       881        93
VIS    2025250    200200   21.4500  144.4300      15.4        88       881        90
VIS    2025250    200200   21.4400  144.4000      15.2        88       875        90
VIS    2025250    200200   21.4500  144.3900      15.1        86       880        91
VIS    2025250    200200   21.4600  144.3500      14.5        86       879        92
VIS    2025250    200200   21.4600  144.3400      14.5        87       879        92
VIS    2025250    200200   21.4400  144.3200      12.8        98       862        95
VIS    2025250    200200   21.4400  143.9700      13.8        99       862        91
VIS    2025250    200200   21.4500  143.9200      15.1        94       901        92
VIS    2025250    200200   21.4500  143.8900      12.2        99       904        99
VIS    2025250    200200   21.4400  143.8700      12.6        95       902        99
VIS    2025250    200200   21.4300  143.8300      12.8        92       907        99
VIS    2025250    200200   21.4500  143.8000      12.4        94       911       100
VIS    2025250    200200   21.4500  143.8000      12.7        93       909       100
VIS    2025250    200200   21.4500  143.6400      12.0        94       870        92
VIS    2025250    200200   21.4300  143.3800      15.1        89       908        92
VIS    2025250    200200   21.4300  143.3800      14.9        89       905        92
VIS    2025250    200200   21.4300  142.8500      12.0        92       987        91
VIS    2025250    200200   21.4300  142.8300      12.5        91       987        93
VIS    2025250    200200   21.4400  142.7900      12.1        94       988        98
VIS    2025250    200200   21.4500  142.7800      12.3        94       989        98
VIS    2025250    200200   21.4400  142.7500      11.2        91       988        98
VIS    2025250    200200   21.4300  142.7200      10.8        92       980        96
VIS    2025250    200200   21.4400  142.7000      10.7        93       979        95
VIS    2025250    200200   21.4400  142.5800      12.1        91       976        99
VIS    2025250    200200   21.4400  142.4700      12.1        89       965        99
VIS    2025250    200200   21.4400  142.4600      12.2        88       957        99
VIS    2025250    200200   21.4700  149.5400       9.9        78       985        92
VIS    2025250    200200   21.4900  149.5000      10.1        88       953        92
VIS    2025250    200200   21.4900  149.4800       9.6        86       932        96
VIS    2025250    200200   21.4700  149.4500       9.2        82       879        97
VIS    2025250    200200   21.4900  149.4300       8.8        84       887        98
VIS    2025250    200200   21.4800  149.4100       8.8        84       894        98
VIS    2025250    200200   21.4800  149.3700       8.2        79       932        96
VIS    2025250    200200   21.4800  149.3500       8.1        75       936        95
VIS    2025250    200200   21.4800  149.3400       8.2        74       936        96
VIS    2025250    200200   21.4800  149.3000       7.6        75       922        98
VIS    2025250    200200   21.4800  149.2700       7.7        86       890       100
VIS    2025250    200200   21.4700  149.2400       8.8        93       896        95
VIS    2025250    200200   21.4700  149.2300       8.7        92       905        96
VIS    2025250    200200   21.4800  149.2000       8.5        90       918        97
VIS    2025250    200200   21.4800  149.1900       8.3        90       918        97
VIS    2025250    200200   21.4700  149.1600       8.3        90       932        98
VIS    2025250    200200   21.4800  149.1300       8.0        93       932        97
VIS    2025250    200200   21.4800  149.1000       7.9        93       899        97
VIS    2025250    200200   21.4900  149.0900       7.8        92       890        98
VIS    2025250    200200   21.4800  149.0500       7.9        92       885        98
VIS    2025250    200200   21.4800  149.0300       7.9        92       885        99
VIS    2025250    200200   21.4700  149.0100       7.9        87       887        99
VIS    2025250    200200   21.4800  148.9800       7.7        86       888        99
VIS    2025250    200200   21.4700  148.9500       7.9        87       891        98
VIS    2025250    200200   21.4800  148.9300       8.3        89       896        97
VIS    2025250    200200   21.4800  148.8900       9.2        88       907        93
VIS    2025250    200200   21.4800  148.8700       9.4        86       911        94
VIS    2025250    200200   21.4800  148.8500       9.2        83       899        94
VIS    2025250    200200   21.4700  148.8300       8.5        83       899        96
VIS    2025250    200200   21.4700  148.7900       8.4        85       897        98
VIS    2025250    200200   21.4600  148.7600       8.5        88       894        97
VIS    2025250    200200   21.4800  148.7500       8.4        87       882        99
VIS    2025250    200200   21.4600  148.7300       8.7        89       880        98
VIS    2025250    200200   21.4700  148.6900       8.4        90       887        99
VIS    2025250    200200   21.4700  148.6700       7.9        88       900        99
VIS    2025250    200200   21.4800  148.6400       8.0        81       911        99
VIS    2025250    200200   21.4800  148.6100       8.6        82       934        99
VIS    2025250    200200   21.4600  148.3400       8.8        80       967        99
VIS    2025250    200200   21.4600  148.3100       8.7        80       967        99
VIS    2025250    200200   21.4700  148.2900       8.7        81       974        99
VIS    2025250    200200   21.4500  148.2500       9.1        80       959       100
VIS    2025250    200200   21.4700  148.2200       9.4        79       925        99
VIS    2025250    200200   21.4600  148.1700       8.7        82       925        93
VIS    2025250    200200   21.4600  148.1300       8.0        84       927        92
VIS    2025250    200200   21.4700  148.1200       8.2        89       912        95
VIS    2025250    200200   21.4500  148.0900       6.9        92       944        90
VIS    2025250    200200   21.4600  148.0500       6.3        79       848        92
VIS    2025250    200200   21.4700  148.0400       6.1        82       842        93
VIS    2025250    200200   21.4500  148.0200       6.7        95       732        94
VIS    2025250    200200   21.4500  147.9300       8.4       104       714        96
VIS    2025250    200200   21.4600  147.9000       9.0        95       749        94
VIS    2025250    200200   21.4600  147.8900       9.0        93       794        94
VIS    2025250    200200   21.4500  147.8400       8.3        88       859        97
VIS    2025250    200200   21.4700  147.8400       8.2        86       853        97
VIS    2025250    200200   21.4600  147.8000       7.8        91       821        95
VIS    2025250    200200   21.4600  147.7700       7.6        92       802        95
VIS    2025250    200200   21.4500  147.7600       7.4        87       794        94
VIS    2025250    200200   21.4700  147.7200       8.2        86       793        92
VIS    2025250    200200   21.4500  147.7000       8.1        94       765        96
VIS    2025250    200200   21.4600  147.6900       8.4        94       769        95
VIS    2025250    200200   21.4500  147.6600       8.7        98       746        96
VIS    2025250    200200   21.4600  147.4800       8.6        82       873        92
VIS    2025250    200200   21.4600  147.4600       9.8        73       931        90
VIS    2025250    200200   21.4400  147.4100      11.4        69       969        98
VIS    2025250    200200   21.4500  146.9700       9.8       101       835        95
VIS    2025250    200200   21.4400  146.9600       9.3        97       835        98
VIS    2025250    200200   21.4400  146.9300       9.3        94       864        99
VIS    2025250    200200   21.4400  146.8700       9.2       112       806        98
VIS    2025250    200200   21.4400  146.8500       9.5       110       810        98
VIS    2025250    200200   21.4400  146.8200      11.0        97       904        99
VIS    2025250    200200   21.4500  146.8000      10.9       101       786        95
VIS    2025250    200200   21.4600  146.7400       6.5       100       790        93
VIS    2025250    200200   21.4400  146.7400       7.0       112       790        94
VIS    2025250    200200   21.4600  146.7000       8.6       101       746        97
VIS    2025250    200200   21.4400  146.6900       9.4       110       723        99
VIS    2025250    200200   21.4400  146.6500      10.5       110       701        95
VIS    2025250    200200   21.4400  146.4600      13.5        83       881        93
VIS    2025250    200200   21.4300  146.4200      13.4        79       938       100
VIS    2025250    200200   21.4400  146.4000      13.2        80       949       100
VIS    2025250    200200   21.4500  146.3800      13.7        82       935        99
VIS    2025250    200200   21.4400  146.3500      15.2        80       883        90
VIS    2025250    200200   21.4400  146.3300      15.1        82       883        91
VIS    2025250    200200   21.4300  146.3000      15.1        84       913        97
VIS    2025250    200200   21.4400  146.2700      15.3        84       916        97
VIS    2025250    200200   21.4400  146.2500      14.3        85       926        99
VIS    2025250    200200   21.4300  146.2200      11.9        93       926        98
VIS    2025250    200200   21.4500  146.1900      11.9        89       927        99
VIS    2025250    200200   21.4500  146.1900      12.0        89       927        99
VIS    2025250    200200   21.4400  146.1600      14.1        78       899        94
VIS    2025250    200200   21.4300  146.1100      13.4        82       876        90
VIS    2025250    200200   21.4300  146.0700      13.9        80       896        96
VIS    2025250    200200   21.4400  146.0500      13.9        80       901        96
VIS    2025250    200200   21.4500  145.9900      15.0        82       919        91
VIS    2025250    200200   21.4300  145.9400      14.2        79       959       100
VIS    2025250    200200   21.4300  145.9200      14.7        78       948        99
VIS    2025250    200200   21.4300  145.8200      14.4        83       897        95
VIS    2025250    200200   21.4300  145.7900      13.8        83       888        93
VIS    2025250    200200   21.4300  145.7900      13.8        83       888        93
VIS    2025250    200200   21.4400  145.7600      14.1        83       894        95
VIS    2025250    200200   21.4300  145.7400      14.3        82       894        95
VIS    2025250    200200   21.4300  145.7000      13.4        83       889        96
VIS    2025250    200200   21.4300  145.6700      13.4        85       887        96
VIS    2025250    200200   21.4200  145.6500      13.1        88       884        97
VIS    2025250    200200   21.4300  145.6300      12.9        87       884        97
VIS    2025250    200200   21.4300  144.7200      12.1        98       829        93
VIS    2025250    200200   21.4300  144.6900       9.7       105       841        95
VIS    2025250    200200   21.4300  144.6700      10.4       101       854        97
VIS    2025250    200200   21.4300  144.6600      11.6        98       855        91
VIS    2025250    200200   21.4300  144.5500      12.0        99       863        97
VIS    2025250    200200   21.4300  144.5300      11.8       100       863        98
VIS    2025250    200200   21.4200  144.5100      11.3       105       863        99
VIS    2025250    200200   21.4100  144.4800      12.5       101       861        95
VIS    2025250    200200   21.4300  144.4600      13.4        95       867        93
VIS    2025250    200200   21.4200  144.3900      12.9        97       859        90
VIS    2025250    200200   21.4300  144.3600      13.0        95       862        92
VIS    2025250    200200   21.4300  144.3400      12.9        93       864        94
VIS    2025250    200200   21.4100  144.3000      12.4       102       847        93
VIS    2025250    200200   21.4100  144.2800      12.1       101       826        93
VIS    2025250    200200   21.4200  144.0300      11.2       104       775        95
VIS    2025250    200200   21.4300  143.9700      13.2        97       840        90
VIS    2025250    200200   21.4100  143.9500      12.1        97       863        95
VIS    2025250    200200   21.4200  143.9400      12.9        99       873        96
VIS    2025250    200200   21.4200  143.9000      13.5        98       891        97
VIS    2025250    200200   21.4200  143.9000      13.6        97       891        97
VIS    2025250    200200   21.4200  143.8500      14.2        90       892        94
VIS    2025250    200200   21.4200  143.8400      13.7        90       892        94
VIS    2025250    200200   21.4100  143.8200      13.6        93       892        94
VIS    2025250    200200   21.4200  143.3800      15.3        89       908        92
VIS    2025250    200200   21.4200  142.8100      12.2        91       987        97
VIS    2025250    200200   21.4000  142.7900      11.8        90       983        97
VIS    2025250    200200   21.4100  142.7600      12.3        90       977        98
VIS    2025250    200200   21.4000  142.7400      12.5        90       965        97
VIS    2025250    200200   21.4200  142.7200      11.5        93       976        96
VIS    2025250    200200   21.4200  142.7000      11.6        94       971        96
VIS    2025250    200200   21.4200  142.6700      11.1        93       975        92
VIS    2025250    200200   21.4000  142.4900      13.1        86       983        97
VIS    2025250    200200   21.4000  142.4700      13.1        87       980        97
VIS    2025250    200200   21.4600  149.5500       9.9        78       985        91
VIS    2025250    200200   21.4600  149.5400      10.1        78       985        90
VIS    2025250    200200   21.4600  149.4900       9.7        80       953        94
VIS    2025250    200200   21.4500  149.4700       9.4        79       908        96
VIS    2025250    200200   21.4500  149.4400       8.9        79       879        97
VIS    2025250    200200   21.4500  149.4300       8.6        80       887        98
VIS    2025250    200200   21.4600  149.4100       8.8        81       901        97
VIS    2025250    200200   21.4400  149.3800       8.6        82       935        94
VIS    2025250    200200   21.4600  149.3400       8.1        74       936        95
VIS    2025250    200200   21.4500  149.3300       7.7        77       932        94
VIS    2025250    200200   21.4500  149.3000       7.9        79       906        98
VIS    2025250    200200   21.4500  149.2900       8.6        84       896        98
VIS    2025250    200200   21.4500  149.2400       8.8        92       899        95
VIS    2025250    200200   21.4500  149.2300       8.5        90       904        97
VIS    2025250    200200   21.4500  149.2000       8.2        88       930        98
VIS    2025250    200200   21.4400  149.1600       8.5        88       940        98
VIS    2025250    200200   21.4500  149.1500       8.4        87       940        99
VIS    2025250    200200   21.4400  149.1300       8.1        86       925        99
VIS    2025250    200200   21.4400  149.0900       7.9        89       900        97
VIS    2025250    200200   21.4500  149.0700       8.0        93       890        97
VIS    2025250    200200   21.4500  149.0400       8.0        91       886        97
VIS    2025250    200200   21.4400  149.0300       8.0        91       886        97
VIS    2025250    200200   21.4400  149.0000       8.1        91       887        98
VIS    2025250    200200   21.4500  148.9600       8.0        89       888        98
VIS    2025250    200200   21.4500  148.9600       8.0        87       889        98
VIS    2025250    200200   21.4500  148.9300       8.7        88       896        96
VIS    2025250    200200   21.4600  148.9000       9.3        91       911        93
VIS    2025250    200200   21.4600  148.8800       9.2        90       918        94
VIS    2025250    200200   21.4500  148.8500       8.7        84       911        97
VIS    2025250    200200   21.4400  148.8200       8.4        80       904        98
VIS    2025250    200200   21.4400  148.7800       8.3        86       902        97
VIS    2025250    200200   21.4600  148.7600       8.5        88       897        97
VIS    2025250    200200   21.4500  148.7300       8.7        89       880        98
VIS    2025250    200200   21.4400  148.7300       8.8        89       880        98
VIS    2025250    200200   21.4400  148.6900       7.6        93       911        95
VIS    2025250    200200   21.4400  148.6700       7.1        92       911        94
VIS    2025250    200200   21.4300  148.6300       8.2        88       954        97
VIS    2025250    200200   21.4300  148.5300       9.1        83       985        97
VIS    2025250    200200   21.4500  148.5000       9.0        83       985        96
VIS    2025250    200200   21.4400  148.5000       9.3        83       985        97
VIS    2025250    200200   21.4400  148.4600       8.9        82       991        98
VIS    2025250    200200   21.4500  148.3800       9.2        79       982        99
VIS    2025250    200200   21.4500  148.3200       8.6        80       967        98
VIS    2025250    200200   21.4300  148.2800       9.3        81       965       100
VIS    2025250    200200   21.4400  148.2600       9.2        81       959       100
VIS    2025250    200200   21.4300  148.2400       8.9        81       930       100
VIS    2025250    200200   21.4500  148.2000       9.2        80       930        98
VIS    2025250    200200   21.4500  148.0800       6.6        84       944        91
VIS    2025250    200200   21.4500  148.0500       6.6        78       895        93
VIS    2025250    200200   21.4500  148.0300       6.5        88       772        91
VIS    2025250    200200   21.4300  148.0100       7.0       105       727        98
VIS    2025250    200200   21.4200  147.9900       8.2       105       701        96
VIS    2025250    200200   21.4300  147.9400       8.6       106       712        96
VIS    2025250    200200   21.4300  147.9100       8.7        99       778        97
VIS    2025250    200200   21.4400  147.8800       8.6        92       805        95
VIS    2025250    200200   21.4400  147.8500       8.3        91       859        99
VIS    2025250    200200   21.4300  147.8400       8.2        93       859        99
VIS    2025250    200200   21.4300  147.8000       7.9        92       800        95
VIS    2025250    200200   21.4300  147.7900       7.8        91       800        95
VIS    2025250    200200   21.4400  147.7500       7.6        83       791        92
VIS    2025250    200200   21.4200  147.7300       7.6        84       749        91
VIS    2025250    200200   21.4300  147.7100       7.8        89       756        94
VIS    2025250    200200   21.4400  147.6800       8.5       100       747        98
VIS    2025250    200200   21.4400  147.6700       8.7        99       746        97
VIS    2025250    200200   21.4300  147.6300       8.5        97       712        92
VIS    2025250    200200   21.4200  147.4600      10.3        79       845        90
VIS    2025250    200200   21.4300  147.4200      11.0        69       937        96
VIS    2025250    200200   21.4200  147.4100      11.1        72       944        98
VIS    2025250    200200   21.4100  146.9800       8.7        96       836        95
VIS    2025250    200200   21.4200  146.9600       8.8        94       835        94
VIS    2025250    200200   21.4200  146.9200       8.9        92       810        93
VIS    2025250    200200   21.4200  146.9100       8.9        95       810        94
VIS    2025250    200200   21.4200  146.8800       9.3       109       792        99
VIS    2025250    200200   21.4300  146.8500       9.6       109       810        98
VIS    2025250    200200   21.4100  146.8200       9.8        99       890        96
VIS    2025250    200200   21.4300  146.7900      10.7        97       869        91
VIS    2025250    200200   21.4300  146.7500       7.3       115       790        92
VIS    2025250    200200   21.4300  146.7300       7.4       113       790        95
VIS    2025250    200200   21.4300  146.7000       9.1       109       737        99
VIS    2025250    200200   21.4200  146.6900       9.6       112       735        99
VIS    2025250    200200   21.4100  146.6400      10.8       108       718        93
VIS    2025250    200200   21.4300  146.4700      13.2        84       910        99
VIS    2025250    200200   21.4300  146.4200      13.3        79       938        99
VIS    2025250    200200   21.4300  146.4200      13.2        78       938        99
VIS    2025250    200200   21.4100  146.3300      15.2        79       929        97
VIS    2025250    200200   21.4300  146.3100      15.0        83       913        97
VIS    2025250    200200   21.4200  146.2800      14.6        85       935        99
VIS    2025250    200200   21.4000  146.2500      11.8        90       938        96
VIS    2025250    200200   21.4200  146.2200      11.6        95       927        96
VIS    2025250    200200   21.4200  146.2100      11.5        95       926        96
VIS    2025250    200200   21.4100  146.1800      13.3        81       892        93
VIS    2025250    200200   21.4100  146.1500      14.2        80       884        93
VIS    2025250    200200   21.4000  146.0900      12.6        90       882        90
VIS    2025250    200200   21.4200  146.0600      13.2        81       901        97
VIS    2025250    200200   21.4100  146.0200      13.3        78       941        93
VIS    2025250    200200   21.4200  146.0100      12.5        82       941        97
VIS    2025250    200200   21.4000  145.9800      14.1        78       960       100
VIS    2025250    200200   21.4200  145.9400      14.6        79       970        99
VIS    2025250    200200   21.4200  145.9300      14.6        79       952        99
VIS    2025250    200200   21.4100  145.8300      15.0        83       901        96
VIS    2025250    200200   21.4200  145.8000      14.4        82       901        96
VIS    2025250    200200   21.4200  145.7700      14.1        82       895        95
VIS    2025250    200200   21.4200  145.7600      14.3        83       895        94
VIS    2025250    200200   21.4100  145.7200      13.4        82       889        95
VIS    2025250    200200   21.4200  145.7000      13.1        85       887        96
VIS    2025250    200200   21.4200  145.6900      13.1        85       887        96
VIS    2025250    200200   21.4200  145.6600      13.3        88       884        97
VIS    2025250    200200   21.4000  145.6200      11.5        91       855        90
VIS    2025250    200200   21.4100  145.5500      13.5        92       744        90
VIS    2025250    200200   21.4100  144.7100      11.2        92       831        90
VIS    2025250    200200   21.4100  144.6700      10.2       100       852        96
VIS    2025250    200200   21.4000  144.5700      12.8        90       858        91
VIS    2025250    200200   21.4000  144.5300      12.0       103       855        96
VIS    2025250    200200   21.3900  144.5200      12.9       103       849        94
VIS    2025250    200200   21.4100  144.4700      12.3       100       839        91
VIS    2025250    200200   21.4000  144.4500      12.0        96       825        91
VIS    2025250    200200   21.4100  144.3600      11.2       109       843        98
VIS    2025250    200200   21.3900  144.3200      11.6       113       843        99
VIS    2025250    200200   21.4000  144.3000      12.2       101       847        95
VIS    2025250    200200   21.4000  144.3000      12.3        99       838        93
VIS    2025250    200200   21.3900  144.0300      11.5       103       818        94
VIS    2025250    200200   21.4000  143.9000      13.9        94       859        90
VIS    2025250    200200   21.3900  143.8100      13.7        98       866        92
VIS    2025250    200200   21.3900  143.7800      14.7        98       872        90
VIS    2025250    200200   21.3900  143.7200      11.9       113       779        93
VIS    2025250    200200   21.3800  142.8900       9.7        97       981        95
VIS    2025250    200200   21.3800  142.8500      11.4        91       981        98
VIS    2025250    200200   21.3900  142.8400      11.8        90       988        96
VIS    2025250    200200   21.3800  142.8100      11.9        90       970        97
VIS    2025250    200200   21.3900  142.7900      12.3        89       970        97
VIS    2025250    200200   21.3900  142.7700      13.1        89       959        99
VIS    2025250    200200   21.3900  142.7500      12.8        89       962        97
VIS    2025250    200200   21.3900  142.7300      12.7        90       962        97
VIS    2025250    200200   21.4400  149.5300      10.4        81       974        90
VIS    2025250    200200   21.4300  149.5000       9.6        80       922        96
VIS    2025250    200200   21.4200  149.4800       9.5        78       895        95
VIS    2025250    200200   21.4200  149.4600       8.8        80       888        97
VIS    2025250    200200   21.4300  149.4200       8.1        80       889        98
VIS    2025250    200200   21.4400  149.4200       8.2        81       901        99
VIS    2025250    200200   21.4200  149.3900       8.1        85       920        95
VIS    2025250    200200   21.4300  149.3600       8.4        81       960        93
VIS    2025250    200200   21.4200  149.3200       7.6        79       931        97
VIS    2025250    200200   21.4200  149.3100       7.7        80       931        99
VIS    2025250    200200   21.4300  149.2800       9.0        87       893        99
VIS    2025250    200200   21.4400  149.2400       8.9        90       897        99
VIS    2025250    200200   21.4300  149.2200       8.3        88       904        98
VIS    2025250    200200   21.4200  149.2100       8.3        87       907        97
VIS    2025250    200200   21.4200  149.1800       8.6        88       925        98
VIS    2025250    200200   21.4400  149.1600       8.4        87       940        99
VIS    2025250    200200   21.4200  149.1200       8.1        85       900        98
VIS    2025250    200200   21.4300  149.1000       8.0        88       900        98
VIS    2025250    200200   21.4300  149.0800       8.0        89       887        98
VIS    2025250    200200   21.4100  149.0600       7.7        85       886        98
VIS    2025250    200200   21.4100  149.0300       7.9        88       887        97
VIS    2025250    200200   21.4300  148.9900       8.1        92       887        98
VIS    2025250    200200   21.4200  148.9800       8.2        91       888        98
VIS    2025250    200200   21.4300  148.9600       8.2        88       891        98
VIS    2025250    200200   21.4100  148.9200       8.8        85       898        93
VIS    2025250    200200   21.4300  148.9100       9.5        90       907        93
VIS    2025250    200200   21.4200  148.8700      10.3        79       951        96
VIS    2025250    200200   21.4300  148.8500       9.1        80       919        97
VIS    2025250    200200   21.4200  148.8100       8.5        81       906        97
VIS    2025250    200200   21.4200  148.8100       8.4        82       905        97
VIS    2025250    200200   21.4300  148.7800       8.2        86       904        96
VIS    2025250    200200   21.4300  148.7600       8.5        86       899        96
VIS    2025250    200200   21.4100  148.7100       8.5        89       882       100
VIS    2025250    200200   21.4300  148.7000       8.3        91       895        98
VIS    2025250    200200   21.4100  148.6800       8.3        90       914        96
VIS    2025250    200200   21.4100  148.6400       8.0        87       946        97
VIS    2025250    200200   21.4100  148.6200       8.4        83       954        99
VIS    2025250    200200   21.4100  148.6000       8.5        81       954        99
VIS    2025250    200200   21.4100  148.5500       8.7        76       992        98
VIS    2025250    200200   21.4100  148.5200       9.0        76       985        99
VIS    2025250    200200   21.4200  148.4900       9.1        82       989        99
VIS    2025250    200200   21.4200  148.4600       8.9        80       985        99
VIS    2025250    200200   21.4200  148.3400       8.5        75       969        90
VIS    2025250    200200   21.4100  148.3000       8.8        80       962        97
VIS    2025250    200200   21.4200  148.2900       9.4        80       965        99
VIS    2025250    200200   21.4200  148.2600       9.4        81       940       100
VIS    2025250    200200   21.4000  148.2400       9.2        80       935        97
VIS    2025250    200200   21.4000  148.0900       6.2        83       976        91
VIS    2025250    200200   21.4200  148.0600       6.2        85       903        92
VIS    2025250    200200   21.4200  148.0500       6.2        91       777        92
VIS    2025250    200200   21.4000  148.0100       6.4       106       767        98
VIS    2025250    200200   21.4200  147.9900       8.1       104       705        96
VIS    2025250    200200   21.4200  147.9300       8.6       103       719        95
VIS    2025250    200200   21.4100  147.9100       8.7        99       786        97
VIS    2025250    200200   21.4100  147.9000       8.9        97       791        96
VIS    2025250    200200   21.4000  147.8500       8.6        99       841       100
VIS    2025250    200200   21.4100  147.8300       8.3       100       841       100
VIS    2025250    200200   21.4200  147.8100       8.1        96       810        97
VIS    2025250    200200   21.4000  147.7800       8.1        89       787        94
VIS    2025250    200200   21.4000  147.7500       8.0        84       787        92
VIS    2025250    200200   21.4200  147.7300       7.6        83       752        91
VIS    2025250    200200   21.4000  147.7000       8.0        90       745        94
VIS    2025250    200200   21.4000  147.6800       8.3        97       739        95
VIS    2025250    200200   21.4000  147.6500       8.5       101       706        93
VIS    2025250    200200   21.4200  147.6300       8.4        98       709        92
VIS    2025250    200200   21.4000  147.4300      11.5        76       914        98
VIS    2025250    200200   21.4000  147.4100      11.5        75       944        99
VIS    2025250    200200   21.4100  147.3900      11.2        73       957        97
VIS    2025250    200200   21.3900  146.9900       8.8        90       859        97
VIS    2025250    200200   21.4000  146.9800       8.6        93       841        96
VIS    2025250    200200   21.3900  146.9200       9.5        94       776        90
VIS    2025250    200200   21.3900  146.9000       9.5       101       776        97
VIS    2025250    200200   21.4000  146.8600       9.0       104       791        97
VIS    2025250    200200   21.3900  146.8400       8.8       101       806        97
VIS    2025250    200200   21.3900  146.8200       9.1       102       904        93
VIS    2025250    200200   21.3900  146.7300       9.3       106       894        96
VIS    2025250    200200   21.3900  146.7300       9.8       103       894        97
VIS    2025250    200200   21.4000  146.7000       9.3       106       782        97
VIS    2025250    200200   21.3800  146.6600      10.0       103       762        96
VIS    2025250    200200   21.4000  146.6500      10.5       108       721        94
VIS    2025250    200200   21.4000  146.4600      13.4        80       910        97
VIS    2025250    200200   21.4000  146.4500      13.7        80       910        97
VIS    2025250    200200   21.3900  146.3800      14.9        78       904        94
VIS    2025250    200200   21.3800  146.3800      14.9        78       904        94
VIS    2025250    200200   21.4000  146.3300      15.1        78       929        97
VIS    2025250    200200   21.4000  146.3300      15.0        79       935        98
VIS    2025250    200200   21.3800  146.2900      14.0        84       925        99
VIS    2025250    200200   21.3900  146.2700      13.0        85       935        99
VIS    2025250    200200   21.4000  146.2500      12.0        89       927        97
VIS    2025250    200200   21.4000  146.2300      11.2        90       908        94
VIS    2025250    200200   21.3900  146.2000      12.4        85       892        94
VIS    2025250    200200   21.4000  146.1600      13.8        80       884        92
VIS    2025250    200200   21.4000  146.1500      14.4        79       876        90
VIS    2025250    200200   21.3800  146.1100      12.9        86       888        97
VIS    2025250    200200   21.3800  146.1000      12.4        90       888        97
VIS    2025250    200200   21.3900  146.0800      11.5        92       915        93
VIS    2025250    200200   21.3800  146.0300      13.8        79       958        94
VIS    2025250    200200   21.3900  146.0100      14.2        79       958        98
VIS    2025250    200200   21.3900  146.0000      14.0        80       958       100
VIS    2025250    200200   21.3800  145.9600      13.7        81       938        99
VIS    2025250    200200   21.3800  145.9300      14.4        81       938        99
VIS    2025250    200200   21.3800  145.9200      14.9        82       926        98
VIS    2025250    200200   21.3800  145.8200      14.3        83       905        97
VIS    2025250    200200   21.3700  145.8000      14.3        83       897        96
VIS    2025250    200200   21.3900  145.7600      14.3        83       895        94
VIS    2025250    200200   21.3900  145.7300      13.5        83       892        95
VIS    2025250    200200   21.3900  145.7200      13.6        83       889        94
VIS    2025250    200200   21.3800  145.6900      13.3        84       879        94
VIS    2025250    200200   21.3800  145.6800      13.5        83       879        93
VIS    2025250    200200   21.3900  145.6300      12.1        89       855        91
VIS    2025250    200200   21.3800  144.5600      12.3        91       855        90
VIS    2025250    200200   21.3800  144.5400      12.9       100       849        93
VIS    2025250    200200   21.3800  144.5300      12.8       102       846        94
VIS    2025250    200200   21.3600  144.3400      11.0       123       809        97
VIS    2025250    200200   21.3800  144.3300      11.2       117       843       100
VIS    2025250    200200   21.3800  144.3100      12.3       105       847        96
VIS    2025250    200200   21.3800  144.0400      11.9       101       828        93
VIS    2025250    200200   21.3600  143.8300      12.5        99       834        91
VIS    2025250    200200   21.3600  143.7900      12.8       103       845        91
VIS    2025250    200200   21.3700  143.7900      13.4       101       852        90
VIS    2025250    200200   21.3800  143.7100      11.9       110       779        90
VIS    2025250    200200   21.3600  143.3700      12.4       100       817        90
VIS    2025250    200200   21.3600  143.3700      12.5       100       817        90
VIS    2025250    200200   21.3600  142.8800      10.8        95       977        96
VIS    2025250    200200   21.3600  142.8600      11.4        93       970        98
VIS    2025250    200200   21.3500  142.8300      12.2        90       963        93
VIS    2025250    200200   21.3500  142.8200      12.4        90       963        92
VIS    2025250    200200   21.3500  142.7900      13.4        88       957        96
VIS    2025250    200200   21.3700  142.7600      13.6        88       957        98
VIS    2025250    200200   21.3500  142.7300      13.8        88       961        98
VIS    2025250    200200   21.3600  142.7200      13.6        89       959        98
VIS    2025250    200200   21.3500  142.6800      12.9        90       969        99
VIS    2025250    200200   21.3500  142.6600      13.1        89       972        99
VIS    2025250    200200   21.3500  142.6200      13.7        91       994        96
VIS    2025250    200200   21.3500  142.4000      12.2        82       978       100
VIS    2025250    200200   21.3900  149.5100      10.5        79       922        93
VIS    2025250    200200   21.3900  149.4800      10.6        77       898        93
VIS    2025250    200200   21.3900  149.4700      10.3        78       895        93
VIS    2025250    200200   21.4000  149.4500       9.1        80       888        97
VIS    2025250    200200   21.4100  149.4200       7.8        81       889        99
VIS    2025250    200200   21.4100  149.4000       7.7        82       903        98
VIS    2025250    200200   21.4000  149.3800       7.9        81       921        93
VIS    2025250    200200   21.4000  149.3500       8.1        82       960        91
VIS    2025250    200200   21.4000  149.3100       7.7        80       931       100
VIS    2025250    200200   21.4100  149.2900       8.4        85       897        99
VIS    2025250    200200   21.3900  149.2600       8.8        90       897        99
VIS    2025250    200200   21.4100  149.2300       8.5        88       900        97
VIS    2025250    200200   21.4000  149.2100       8.4        89       907        97
VIS    2025250    200200   21.4000  149.2000       8.5        88       907        97
VIS    2025250    200200   21.4000  149.1600       8.7        89       924        97
VIS    2025250    200200   21.4000  149.1300       8.3        85       893        98
VIS    2025250    200200   21.3900  149.1200       8.2        83       891        98
VIS    2025250    200200   21.3900  149.1000       7.8        81       891        98
VIS    2025250    200200   21.4100  149.0600       7.7        83       887        98
VIS    2025250    200200   21.3900  149.0300       7.9        81       889        98
VIS    2025250    200200   21.3900  149.0200       8.2        84       890        97
VIS    2025250    200200   21.3900  148.9800       8.2        88       891        98
VIS    2025250    200200   21.4100  148.9600       8.3        87       891        98
VIS    2025250    200200   21.3900  148.9400       8.3        84       894        97
VIS    2025250    200200   21.4100  148.9200       8.7        83       900        93
VIS    2025250    200200   21.3900  148.8900       9.0        79       926        96
VIS    2025250    200200   21.4000  148.8500      10.3        75       941        93
VIS    2025250    200200   21.3800  148.8300       9.3        80       937        94
VIS    2025250    200200   21.4000  148.8000       8.3        83       906        97
VIS    2025250    200200   21.4000  148.7900       8.2        84       905        96
VIS    2025250    200200   21.4000  148.7700       8.0        85       900        97
VIS    2025250    200200   21.3900  148.7400       8.2        84       884       100
VIS    2025250    200200   21.3800  148.7100       8.6        85       884       100
VIS    2025250    200200   21.3800  148.6800       9.0        87       903        99
VIS    2025250    200200   21.3800  148.6500       8.7        86       918        99
VIS    2025250    200200   21.4000  148.6200       8.2        83       954        98
VIS    2025250    200200   21.3800  148.5900       8.1        79       948        97
VIS    2025250    200200   21.3900  148.5900       8.2        79       954        94
VIS    2025250    200200   21.4000  148.5600       8.8        78       992        95
VIS    2025250    200200   21.4000  148.5400       8.7        73       991        99
VIS    2025250    200200   21.4000  148.5100       9.0        77       985        98
VIS    2025250    200200   21.4000  148.4700       9.1        81       979        99
VIS    2025250    200200   21.3900  148.4500       8.8        80       976        99
VIS    2025250    200200   21.3800  148.4300       8.5        78       974        97
VIS    2025250    200200   21.3900  148.2600       9.4        83       948        95
VIS    2025250    200200   21.3900  148.2400       9.3        80       938        96
VIS    2025250    200200   21.3800  148.0900       6.8        72       980        91
VIS    2025250    200200   21.3900  148.0500       7.0       115       804        94
VIS    2025250    200200   21.3700  148.0500       7.6       120       803        96
VIS    2025250    200200   21.3700  148.0200       7.8       122       789        94
VIS    2025250    200200   21.3800  148.0000       7.0       110       768        99
VIS    2025250    200200   21.3800  147.9600       8.8        99       712        93
VIS    2025250    200200   21.3900  147.9400       8.6        96       712        92
VIS    2025250    200200   21.3900  147.9000       8.5        97       791        96
VIS    2025250    200200   21.3800  147.8800       8.3        97       825        99
VIS    2025250    200200   21.3900  147.8500       8.6        99       841       100
VIS    2025250    200200   21.3800  147.8400       8.4        98       835        99
VIS    2025250    200200   21.3700  147.8100       8.3        99       789        97
VIS    2025250    200200   21.3800  147.8000       8.2        97       786        97
VIS    2025250    200200   21.3900  147.7500       8.2        84       784        92
VIS    2025250    200200   21.3900  147.7500       8.2        83       784        91
VIS    2025250    200200   21.3900  147.7100       8.2        87       745        91
VIS    2025250    200200   21.3900  147.6900       8.4        94       744        95
VIS    2025250    200200   21.3700  147.6700       8.6        98       713        92
VIS    2025250    200200   21.3700  147.6500       8.8       103       700        90
VIS    2025250    200200   21.3800  147.4400      10.8        79       899        99
VIS    2025250    200200   21.3800  147.4100      11.4        78       942        98
VIS    2025250    200200   21.3700  146.9100       8.9        95       758        93
VIS    2025250    200200   21.3600  146.8800       8.1        99       776        95
VIS    2025250    200200   21.3700  146.8700       8.0       100       776        96
VIS    2025250    200200   21.3700  146.8400       8.8       102       842        99
VIS    2025250    200200   21.3700  146.8100       9.7        99       904        94
VIS    2025250    200200   21.3600  146.7500      10.7       103       919        95
VIS    2025250    200200   21.3600  146.7400      10.6       101       917        96
VIS    2025250    200200   21.3700  146.7000      12.0        85       894        95
VIS    2025250    200200   21.3800  146.6600      10.0       102       762        96
VIS    2025250    200200   21.3700  146.6200       9.3        93       722        91
VIS    2025250    200200   21.3700  146.4000      15.4        81       904        94
VIS    2025250    200200   21.3800  146.3800      15.2        78       904        93
VIS    2025250    200200   21.3600  146.3600      15.2        78       943        99
VIS    2025250    200200   21.3600  146.3300      14.7        79       925        97
VIS    2025250    200200   21.3700  146.3100      14.3        82       925        98
VIS    2025250    200200   21.3600  146.2900      13.9        82       897        95
VIS    2025250    200200   21.3700  146.2500      13.0        84       886        92
VIS    2025250    200200   21.3700  146.2400      12.9        84       886        90
VIS    2025250    200200   21.3700  146.1700      13.9        80       873        90
VIS    2025250    200200   21.3600  146.1200      14.1        81       880        92
VIS    2025250    200200   21.3700  146.1100      13.2        84       880        95
VIS    2025250    200200   21.3600  146.0900      12.4        84       915        99
VIS    2025250    200200   21.3700  146.0500      12.7        82       958        98
VIS    2025250    200200   21.3600  146.0200      14.8        80       949        97
VIS    2025250    200200   21.3500  145.9900      15.0        82       937        99
VIS    2025250    200200   21.3600  145.9800      14.4        82       937        99
VIS    2025250    200200   21.3500  145.9600      13.9        82       914        98
VIS    2025250    200200   21.3500  145.9300      14.3        85       915        97
VIS    2025250    200200   21.3700  145.9200      14.7        84       926        99
VIS    2025250    200200   21.3600  145.8800      14.5        86       886        95
VIS    2025250    200200   21.3700  145.8500      14.4        84       895        96
VIS    2025250    200200   21.3700  145.8400      14.7        84       905        97
VIS    2025250    200200   21.3700  145.8000      14.3        83       895        96
VIS    2025250    200200   21.3600  145.7900      14.0        83       888        95
VIS    2025250    200200   21.3500  145.7500      12.9        85       886        95
VIS    2025250    200200   21.3600  145.7400      12.7        85       886        95
VIS    2025250    200200   21.3500  145.6900      13.6        81       872        91
VIS    2025250    200200   21.3500  145.6900      13.8        81       865        90
VIS    2025250    200200   21.3500  143.8300      12.5        97       792        90
VIS    2025250    200200   21.3300  142.8900      12.4        89       947        97
VIS    2025250    200200   21.3300  142.8900      12.1        91       950        98
VIS    2025250    200200   21.3300  142.8400      12.6        91       957        99
VIS    2025250    200200   21.3300  142.8300      12.7        89       957        99
VIS    2025250    200200   21.3300  142.8100      12.8        89       962        94
VIS    2025250    200200   21.3300  142.7900      13.9        87       962        97
VIS    2025250    200200   21.3200  142.7600      13.7        85       971        99
VIS    2025250    200200   21.3400  142.7300      13.8        89       965        98
VIS    2025250    200200   21.3400  142.7000      13.4        90       966        99
VIS    2025250    200200   21.3200  142.6700      13.1        88       969        99
VIS    2025250    200200   21.3300  142.6600      13.1        88       970        99
VIS    2025250    200200   21.3400  142.6200      13.5        88       994        98
VIS    2025250    200200   21.3200  142.5500      12.7        83       984        98
VIS    2025250    200200   21.3400  142.4500      11.7        88       982        98
VIS    2025250    200200   21.3400  142.4400      11.8        87       982        98
VIS    2025250    200200   21.3300  142.4000      12.8        83       978        98
VIS    2025250    200200   21.3300  142.3900      12.7        84       976        97
VIS    2025250    200200   21.4100  152.0700       6.9        89       989        94
VIS    2025250    200200   21.4100  152.0600       6.9        89       989        94
VIS    2025250    200200   21.4100  152.0400       6.6        87       988        90
VIS    2025250    200200   21.3700  149.7700       9.0        88       918        99
VIS    2025250    200200   21.3700  149.7600       9.1        88       918        99
VIS    2025250    200200   21.3700  149.7400       8.9        87       918        97
VIS    2025250    200200   21.3700  149.6800       9.0        89       955        94
VIS    2025250    200200   21.3700  149.6500       9.4        88       955        94
VIS    2025250    200200   21.3700  149.6300       9.5        84       955        91
VIS    2025250    200200   21.3700  149.6000       9.8        81       940        92
VIS    2025250    200200   21.3700  149.5800       9.9        80       928        90
VIS    2025250    200200   21.3700  149.5200      10.2        75       950        91
VIS    2025250    200200   21.3800  149.4900      11.1        77       898        91
VIS    2025250    200200   21.3900  149.4800      10.8        78       895        92
VIS    2025250    200200   21.3800  149.4500       9.7        79       883        96
VIS    2025250    200200   21.3900  149.4300       8.4        80       882        98
VIS    2025250    200200   21.3900  149.3800       7.8        78       903        94
VIS    2025250    200200   21.3700  149.3500       7.9        77       961        94
VIS    2025250    200200   21.3700  149.3300       8.0        80       953        95
VIS    2025250    200200   21.3700  149.3000       8.4        85       905        98
VIS    2025250    200200   21.3800  149.2800       8.7        87       902        99
VIS    2025250    200200   21.3800  149.2300       8.9        94       902        94
VIS    2025250    200200   21.3900  149.2200       8.5        91       907        97
VIS    2025250    200200   21.3800  149.1900       8.4        89       906        97
VIS    2025250    200200   21.3600  149.1600       7.9        86       889        99
VIS    2025250    200200   21.3700  149.1300       8.1        85       887        98
VIS    2025250    200200   21.3600  149.1200       8.1        84       887        98
VIS    2025250    200200   21.3800  149.1000       7.9        82       891        98
VIS    2025250    200200   21.3800  149.0700       7.5        79       889        98
VIS    2025250    200200   21.3600  149.0400       7.9        78       889        98
VIS    2025250    200200   21.3600  149.0200       8.2        80       890        97
VIS    2025250    200200   21.3600  148.9800       8.3        88       891        97
VIS    2025250    200200   21.3600  148.9500       8.1        83       894        98
VIS    2025250    200200   21.3700  148.9300       8.0        79       906        95
VIS    2025250    200200   21.3600  148.9200       8.0        78       909        95
VIS    2025250    200200   21.3700  148.8900       8.6        78       929        98
VIS    2025250    200200   21.3600  148.8700       9.0        81       929        99
VIS    2025250    200200   21.3800  148.8300       9.3        81       937        94
VIS    2025250    200200   21.3600  148.8000       8.6        83       904        94
VIS    2025250    200200   21.3600  148.8000       8.5        83       903        94
VIS    2025250    200200   21.3800  148.7700       8.1        85       900        96
VIS    2025250    200200   21.3600  148.7300       8.3        85       884       100
VIS    2025250    200200   21.3600  148.7000       8.9        86       886       100
VIS    2025250    200200   21.3700  148.6800       9.2        87       897        99
VIS    2025250    200200   21.3600  148.6600       8.9        85       897        99
VIS    2025250    200200   21.3700  148.6400       8.5        85       899        99
VIS    2025250    200200   21.3800  148.6000       8.0        80       933        98
VIS    2025250    200200   21.3800  148.5900       8.1        79       933        97
VIS    2025250    200200   21.3700  148.5500       8.9        78       991        96
VIS    2025250    200200   21.3700  148.5300       8.6        74       972        99
VIS    2025250    200200   21.3800  148.5100       8.6        76       972        98
VIS    2025250    200200   21.3600  148.4800       8.5        76       959        98
VIS    2025250    200200   21.3600  148.4600       8.5        80       941        99
VIS    2025250    200200   21.3500  148.4300       8.2        80       931        97
VIS    2025250    200200   21.3700  148.4200       8.4        78       971        96
VIS    2025250    200200   21.3500  148.2800       7.7        83       948        97
VIS    2025250    200200   21.3500  148.2800       7.6        82       948        97
VIS    2025250    200200   21.3700  148.0600       6.9       108       873        93
VIS    2025250    200200   21.3700  148.0500       7.7       121       805        96
VIS    2025250    200200   21.3500  148.0300       8.5       121       805        95
VIS    2025250    200200   21.3500  147.9900       8.7       111       807        94
VIS    2025250    200200   21.3500  147.9700       9.6       104       780        95
VIS    2025250    200200   21.3500  147.8800       7.8        96       762        97
VIS    2025250    200200   21.3500  147.8700       7.8        95       768        97
VIS    2025250    200200   21.3700  147.8400       8.4        97       835        99
VIS    2025250    200200   21.3500  147.8100       8.3        95       816        97
VIS    2025250    200200   21.3500  147.7900       8.5        97       791        95
VIS    2025250    200200   21.3500  147.7500       9.3        88       772        91
VIS    2025250    200200   21.3600  147.7500       9.3        86       773        90
VIS    2025250    200200   21.3600  147.7000       8.7        93       724        91
VIS    2025250    200200   21.3600  147.6900       8.8        96       716        92
VIS    2025250    200200   21.3600  147.6600       8.9       100       705        91
VIS    2025250    200200   21.3600  147.6500       8.9       102       700        91
VIS    2025250    200200   21.3400  147.5200       9.1        93       725        92
VIS    2025250    200200   21.3400  147.4900       9.3        88       765        92
VIS    2025250    200200   21.3400  147.4700       9.2        85       827        93
VIS    2025250    200200   21.3500  147.4400       9.3        83       892        96
VIS    2025250    200200   21.3600  147.4100      10.4        81       942        95
VIS    2025250    200200   21.3500  146.8900       8.2        98       776        92
VIS    2025250    200200   21.3500  146.8600       7.7        99       808        93
VIS    2025250    200200   21.3400  146.8400       8.5        99       842        98
VIS    2025250    200200   21.3300  146.8100      10.2        99       835        98
VIS    2025250    200200   21.3300  146.7800      12.8        98       773        91
VIS    2025250    200200   21.3300  146.7800      12.7        98       773        91
VIS    2025250    200200   21.3500  146.7500      11.0       103       907        97
VIS    2025250    200200   21.3400  146.7100      11.7        90       878        95
VIS    2025250    200200   21.3400  146.4300      15.7        81       889        90
VIS    2025250    200200   21.3500  146.4300      15.9        81       889        90
VIS    2025250    200200   21.3300  146.3800      15.4        79       935        98
VIS    2025250    200200   21.3400  146.3800      15.5        79       943        98
VIS    2025250    200200   21.3400  146.3400      15.4        79       920        96
VIS    2025250    200200   21.3500  146.3300      15.1        79       920        96
VIS    2025250    200200   21.3400  146.2400      14.2        82       873        90
VIS    2025250    200200   21.3300  146.2100      14.5        82       871        90
VIS    2025250    200200   21.3300  146.1300      14.9        77       888        91
VIS    2025250    200200   21.3400  146.1300      14.7        78       888        92
VIS    2025250    200200   21.3500  146.1000      14.0        78       915        97
VIS    2025250    200200   21.3300  146.0800      15.1        76       938        97
VIS    2025250    200200   21.3300  146.0500      15.3        77       958        98
VIS    2025250    200200   21.3500  146.0100      15.6        82       937        98
VIS    2025250    200200   21.3400  146.0000      15.4        82       935        98
VIS    2025250    200200   21.3400  145.9800      15.0        82       914        97
VIS    2025250    200200   21.3500  145.9400      14.3        84       914        97
VIS    2025250    200200   21.3400  145.9200      14.4        87       897        94
VIS    2025250    200200   21.3500  145.9000      14.6        87       888        94
VIS    2025250    200200   21.3300  145.8700      13.2        89       886        97
VIS    2025250    200200   21.3400  145.8500      13.1        87       886        97
VIS    2025250    200200   21.3400  145.8100      13.5        85       888        95
VIS    2025250    200200   21.3400  145.8000      13.6        84       888        96
VIS    2025250    200200   21.3400  145.7700      13.4        85       886        95
VIS    2025250    200200   21.3400  145.7500      13.1        85       876        94
VIS    2025250    200200   21.3300  145.7100      13.5        83       865        90
VIS    2025250    200200   21.3100  144.1500      12.6       115       786        94
VIS    2025250    200200   21.3200  144.1300      11.8       121       834        95
VIS    2025250    200200   21.3200  144.0400      10.0       118       837        99
VIS    2025250    200200   21.3200  144.0400      10.8       112       837        99
VIS    2025250    200200   21.3200  143.8400      12.2        95       834        90
VIS    2025250    200200   21.3200  143.8200      12.3        92       830        90
VIS    2025250    200200   21.3200  143.8100      12.1        97       832        90
VIS    2025250    200200   21.3200  143.7900      12.1       100       838        92
VIS    2025250    200200   21.3200  143.7400      12.4       102       789        92
VIS    2025250    200200   21.3100  142.8600      14.1        89       951        98
VIS    2025250    200200   21.3100  142.8300      13.5        89       956        98
VIS    2025250    200200   21.3100  142.8100      12.8        90       957        95
VIS    2025250    200200   21.3200  142.8000      13.2        88       962        96
VIS    2025250    200200   21.3200  142.7700      13.7        86       971        98
VIS    2025250    200200   21.3000  142.7300      13.1        89       972        98
VIS    2025250    200200   21.3000  142.7100      13.8        88       965        98
VIS    2025250    200200   21.3100  142.7000      13.8        88       967        98
VIS    2025250    200200   21.3100  142.6600      13.0        88       966        98
VIS    2025250    200200   21.3000  142.6500      13.2        88       969        95
VIS    2025250    200200   21.3000  142.6100      13.5        89       969        94
VIS    2025250    200200   21.3000  142.6000      13.1        89       968        94
VIS    2025250    200200   21.3100  142.5700      12.2        87       968        97
VIS    2025250    200200   21.3000  142.5500      12.7        85       965        99
VIS    2025250    200200   21.3100  142.5200      13.7        84       982        98
VIS    2025250    200200   21.3000  142.5000      13.9        85       980        98
VIS    2025250    200200   21.3200  142.4600      12.2        91       987        98
VIS    2025250    200200   21.3100  142.4600      12.3        90       980        97
VIS    2025250    200200   21.3200  142.4300      12.8        85       978        98
VIS    2025250    200200   21.4000  152.0600       6.9        89       989        94
VIS    2025250    200200   21.4000  152.0600       6.9        89       989        94
VIS    2025250    200200   21.3800  152.0200       6.0        81       983        98
VIS    2025250    200200   21.3800  152.0000       5.5        81       981        99
VIS    2025250    200200   21.3800  151.9700       5.1        91       974        94
VIS    2025250    200200   21.3500  149.7500       9.1        88       918        98
VIS    2025250    200200   21.3600  149.7200       8.7        85       898        97
VIS    2025250    200200   21.3700  149.6800       9.0        90       955        95
VIS    2025250    200200   21.3600  149.6700       9.3        89       955        94
VIS    2025250    200200   21.3500  149.6200       9.6        84       909        96
VIS    2025250    200200   21.3500  149.6000       9.9        83       924        95
VIS    2025250    200200   21.3600  149.5300       9.3        76       954        92
VIS    2025250    200200   21.3400  149.5000       9.9        79       954        91
VIS    2025250    200200   21.3500  149.4800      10.1        81       922        94
VIS    2025250    200200   21.3600  149.4600      10.1        80       898        95
VIS    2025250    200200   21.3600  149.3500       7.9        78       961        94
VIS    2025250    200200   21.3600  149.3300       8.1        82       953        94
VIS    2025250    200200   21.3600  149.3000       8.7        87       905        97
VIS    2025250    200200   21.3600  149.2900       8.8        88       894        98
VIS    2025250    200200   21.3400  149.2400       9.3        93       888        94
VIS    2025250    200200   21.3500  149.2200       8.9        93       889        96
VIS    2025250    200200   21.3400  149.2100       8.5        89       889        97
VIS    2025250    200200   21.3600  149.1900       8.1        87       891        98
VIS    2025250    200200   21.3600  149.1600       7.8        85       889        99
VIS    2025250    200200   21.3600  149.1300       7.9        84       887        98
VIS    2025250    200200   21.3400  149.1000       8.3        89       894        96
VIS    2025250    200200   21.3400  149.0700       8.4        87       895        98
VIS    2025250    200200   21.3400  149.0500       8.1        82       891        98
VIS    2025250    200200   21.3500  149.0200       8.2        80       890        95
VIS    2025250    200200   21.3500  149.0100       8.3        84       890        96
VIS    2025250    200200   21.3400  148.9700       8.8        90       896        94
VIS    2025250    200200   21.3600  148.9500       8.1        84       894        98
VIS    2025250    200200   21.3600  148.9300       8.1        79       909        95
VIS    2025250    200200   21.3300  148.8800       9.1        79       926        98
VIS    2025250    200200   21.3300  148.8800       9.2        79       926        98
VIS    2025250    200200   21.3500  148.8400       9.1        84       919        97
VIS    2025250    200200   21.3400  148.8100       9.0        82       908        95
VIS    2025250    200200   21.3500  148.8000       8.6        83       904        93
VIS    2025250    200200   21.3500  148.7700       8.4        82       900        95
VIS    2025250    200200   21.3500  148.7400       8.3        85       899        98
VIS    2025250    200200   21.3400  148.7200       8.3        85       886       100
VIS    2025250    200200   21.3400  148.6800       9.0        87       888        99
VIS    2025250    200200   21.3400  148.6800       9.1        86       888        99
VIS    2025250    200200   21.3300  148.6400       8.6        84       883        99
VIS    2025250    200200   21.3300  148.6200       8.6        85       886       100
VIS    2025250    200200   21.3500  148.5800       8.9        80       931        99
VIS    2025250    200200   21.3400  148.5800       9.0        81       946        99
VIS    2025250    200200   21.3400  148.5400       8.8        79       946        97
VIS    2025250    200200   21.3500  148.5100       8.5        77       947        97
VIS    2025250    200200   21.3500  148.5000       8.3        76       945        97
VIS    2025250    200200   21.3400  148.4700       7.8        77       912        99
VIS    2025250    200200   21.3300  148.4400       8.2        81       918        99
VIS    2025250    200200   21.3300  148.3100       6.8        87       948        95
VIS    2025250    200200   21.3400  148.2800       7.4        81       948        97
VIS    2025250    200200   21.3500  148.2700       7.0        80       949        96
VIS    2025250    200200   21.3400  148.0700       6.6       105       890        93
VIS    2025250    200200   21.3300  148.0500       7.2       116       849        96
VIS    2025250    200200   21.3300  148.0200       7.9       113       821        98
VIS    2025250    200200   21.3300  148.0000       8.1       109       837        98
VIS    2025250    200200   21.3400  147.9800       9.4       105       807        97
VIS    2025250    200200   21.3300  147.9000       9.2        96       747        94
VIS    2025250    200200   21.3300  147.8700       8.2        94       768        96
VIS    2025250    200200   21.3200  147.8400       8.6        92       853        98
VIS    2025250    200200   21.3300  147.8300       8.6        91       853        97
VIS    2025250    200200   21.3300  147.8000       8.3        94       821        96
VIS    2025250    200200   21.3300  147.7800       8.6        94       793        94
VIS    2025250    200200   21.3300  147.7500       8.8        89       765        92
VIS    2025250    200200   21.3400  147.7100       8.7        93       719        91
VIS    2025250    200200   21.3400  147.6900       9.0       100       715        92
VIS    2025250    200200   21.3200  147.6100       9.2        95       706        90
VIS    2025250    200200   21.3400  147.5200       8.9        91       725        92
VIS    2025250    200200   21.3200  147.4900       8.9        87       808        93
VIS    2025250    200200   21.3400  147.4700       9.1        87       827        93
VIS    2025250    200200   21.3200  147.4500       8.9        85       867        93
VIS    2025250    200200   21.3200  147.4200       8.9        85       908        94
VIS    2025250    200200   21.3100  147.1200      13.5        83       907        97
VIS    2025250    200200   21.3200  147.0000      12.1        84       888        97
VIS    2025250    200200   21.3300  146.9700      12.3        83       864        91
VIS    2025250    200200   21.3200  146.9200      10.3       101       842        96
VIS    2025250    200200   21.3100  146.8800       9.2        99       907        95
VIS    2025250    200200   21.3300  146.8400       8.1        99       835        97
VIS    2025250    200200   21.3100  146.8300       9.1       100       799        96
VIS    2025250    200200   21.3300  146.7900      12.7        99       773        91
VIS    2025250    200200   21.3300  146.7800      12.6        99       773        92
VIS    2025250    200200   21.3200  146.7500      10.7       102       746        92
VIS    2025250    200200   21.3200  146.7300      11.3        98       752        90
VIS    2025250    200200   21.3200  146.4900      15.1        80       881        90
VIS    2025250    200200   21.3100  146.4600      14.8        80       886        91
VIS    2025250    200200   21.3100  146.4100      14.6        79       915        96
VIS    2025250    200200   21.3100  146.4100      14.7        79       915        96
VIS    2025250    200200   21.3200  146.3700      15.6        81       923        97
VIS    2025250    200200   21.3100  146.3400      15.6        81       899        92
VIS    2025250    200200   21.3000  146.3300      15.5        82       894        90
VIS    2025250    200200   21.3200  146.2600      13.2        81       873        90
VIS    2025250    200200   21.3200  146.2600      13.2        82       872        90
VIS    2025250    200200   21.3000  146.2100      14.5        82       876        91
VIS    2025250    200200   21.3200  146.1300      15.6        75       892        90
VIS    2025250    200200   21.3100  146.1100      15.2        80       935        96
VIS    2025250    200200   21.3100  146.0800      15.1        79       958        98
VIS    2025250    200200   21.3100  146.0500      14.8        79       958        99
VIS    2025250    200200   21.3000  146.0100      14.6        82       935        99
VIS    2025250    200200   21.3000  146.0000      14.9        83       935        99
VIS    2025250    200200   21.3200  145.9700      15.7        83       907        95
VIS    2025250    200200   21.3100  145.9600      15.7        83       907        95
VIS    2025250    200200   21.3100  145.9300      15.1        84       897        91
VIS    2025250    200200   21.3100  145.9000      13.7        89       891        93
VIS    2025250    200200   21.3200  145.8800      13.0        89       888        97
VIS    2025250    200200   21.3000  145.8400      12.8        86       886        96
VIS    2025250    200200   21.3000  145.8100      12.4        86       882        96
VIS    2025250    200200   21.3000  145.8100      12.7        85       878        94
VIS    2025250    200200   21.3000  144.1500      13.2       109       786        91
VIS    2025250    200200   21.2800  144.1400      12.0       113       820        96
VIS    2025250    200200   21.2800  144.1200      10.3       118       841        99
VIS    2025250    200200   21.2900  144.0500      13.2       107       886        92
VIS    2025250    200200   21.2900  144.0400      12.1       110       882        94
VIS    2025250    200200   21.2900  144.0000      12.4       104       880        92
VIS    2025250    200200   21.3000  143.8500      11.8       102       834        94
VIS    2025250    200200   21.2800  143.8400      12.1       111       830        95
VIS    2025250    200200   21.3000  143.7700      12.9       108       768        92
VIS    2025250    200200   21.2700  142.8700      14.5        87       948        97
VIS    2025250    200200   21.2800  142.8500      14.7        88       951        96
VIS    2025250    200200   21.2900  142.8300      13.4        92       957        98
VIS    2025250    200200   21.2800  142.7900      14.1        90       964        97
VIS    2025250    200200   21.2800  142.7800      13.8        90       965        97
VIS    2025250    200200   21.2800  142.7400      12.7        89       961        97
VIS    2025250    200200   21.2800  142.7300      13.0        89       961        98
VIS    2025250    200200   21.2800  142.6900      13.3        86       960        99
VIS    2025250    200200   21.2800  142.6600      13.1        88       963        96
VIS    2025250    200200   21.2900  142.6600      13.1        88       963        95
VIS    2025250    200200   21.2700  142.6200      13.5        88       946        95
VIS    2025250    200200   21.2700  142.5900      13.6        88       944        97
VIS    2025250    200200   21.2800  142.5800      13.5        88       958        98
VIS    2025250    200200   21.2900  142.5600      13.0        86       965        99
VIS    2025250    200200   21.2900  142.5300      13.3        86       966        99
VIS    2025250    200200   21.2800  142.4900      13.1        86       959        98
VIS    2025250    200200   21.2800  142.4700      13.0        86       952        98
VIS    2025250    200200   21.2800  142.4400      13.1        88       957        97
VIS    2025250    200200   21.2800  142.4300      13.3        88       957        97
VIS    2025250    200200   21.2700  142.4100      13.5        89       959        94
VIS    2025250    200200   21.3800  152.0600       6.6        86       987        91
VIS    2025250    200200   21.3600  152.0300       6.1        83       981        98
VIS    2025250    200200   21.3700  152.0100       5.8        81       981        98
VIS    2025250    200200   21.3700  151.9900       5.4        87       974        97
VIS    2025250    200200   21.3300  149.8300      10.2        82       930        92
VIS    2025250    200200   21.3200  149.8100      10.2        84       926        95
VIS    2025250    200200   21.3300  149.8000       9.9        86       930        96
VIS    2025250    200200   21.3300  149.7600       9.3        88       930        98
VIS    2025250    200200   21.3300  149.7300       9.2        85       884        98
VIS    2025250    200200   21.3200  149.6700      10.0        85       927        95
VIS    2025250    200200   21.3300  149.6300       9.8        84       927        95
VIS    2025250    200200   21.3200  149.6100      10.1        82       909        95
VIS    2025250    200200   21.3400  149.5900       9.9        81       909        95
VIS    2025250    200200   21.3200  149.5700       9.4        79       924        91
VIS    2025250    200200   21.3200  149.5000      10.0        78       954        93
VIS    2025250    200200   21.3200  149.4800       9.5        77       922        95
VIS    2025250    200200   21.3200  149.3600       8.3        74       958        97
VIS    2025250    200200   21.3200  149.3300       9.1        80       916        97
VIS    2025250    200200   21.3400  149.3100       8.9        86       905        96
VIS    2025250    200200   21.3300  149.2800       9.0        89       890        99
VIS    2025250    200200   21.3100  149.2600       9.0        87       889        99
VIS    2025250    200200   21.3100  149.2300       9.0        86       889        96
VIS    2025250    200200   21.3300  149.2100       8.6        88       889        97
VIS    2025250    200200   21.3300  149.1800       7.8        83       889        98
VIS    2025250    200200   21.3300  149.1700       7.5        81       889        99
VIS    2025250    200200   21.3300  149.1400       7.7        82       889        98
VIS    2025250    200200   21.3300  149.1200       8.1        85       890        97
VIS    2025250    200200   21.3300  149.0900       8.6        90       895        96
VIS    2025250    200200   21.3300  149.0600       8.5        87       895        97
VIS    2025250    200200   21.3300  149.0400       8.2        82       892        97
VIS    2025250    200200   21.3300  149.0100       8.2        83       892        95
VIS    2025250    200200   21.3300  148.9700       8.7        89       896        94
VIS    2025250    200200   21.3300  148.9500       8.3        82       906        96
VIS    2025250    200200   21.3200  148.9300       8.3        76       921        97
VIS    2025250    200200   21.3200  148.8900       9.2        78       936        99
VIS    2025250    200200   21.3100  148.8700       9.7        78       925        96
VIS    2025250    200200   21.3100  148.8600       9.7        79       925        96
VIS    2025250    200200   21.3100  148.8200      10.1        79       911        93
VIS    2025250    200200   21.3300  148.8000       9.1        80       904        94
VIS    2025250    200200   21.3100  148.7800       9.2        80       904        95
VIS    2025250    200200   21.3100  148.7500       8.5        83       899        97
VIS    2025250    200200   21.3200  148.7300       8.2        83       895        99
VIS    2025250    200200   21.3100  148.7100       8.2        82       886        95
VIS    2025250    200200   21.3200  148.6900       8.8        87       887        97
VIS    2025250    200200   21.3300  148.6400       8.7        85       878        99
VIS    2025250    200200   21.3200  148.6100       8.8        87       887       100
VIS    2025250    200200   21.3100  148.6000       9.0        86       898       100
VIS    2025250    200200   21.3100  148.5700       8.9        81       913        99
VIS    2025250    200200   21.3100  148.5500       8.7        82       931        98
VIS    2025250    200200   21.3200  148.5200       8.5        83       913        99
VIS    2025250    200200   21.3100  148.4900       7.9        81       909        99
VIS    2025250    200200   21.3100  148.4600       8.1        80       904        99
VIS    2025250    200200   21.3200  148.3300       6.6        88       964        94
VIS    2025250    200200   21.3200  148.3100       7.0        89       964        95
VIS    2025250    200200   21.3200  148.2800       7.6        84       952        97
VIS    2025250    200200   21.3200  148.0600       7.2       113       871        91
VIS    2025250    200200   21.3100  148.0400       7.5       116       821        90
VIS    2025250    200200   21.3000  148.0000       7.4        98       837        99
VIS    2025250    200200   21.3000  147.9900       7.5        98       837        99
VIS    2025250    200200   21.3100  147.9600       8.3        98       767        97
VIS    2025250    200200   21.3100  147.8900       9.6        89       751        91
VIS    2025250    200200   21.3200  147.8500       8.5        92       865        99
VIS    2025250    200200   21.3200  147.8400       8.6        92       865        99
VIS    2025250    200200   21.3100  147.8200       8.6        92       851        94
VIS    2025250    200200   21.3200  147.7700       8.3        93       780        95
VIS    2025250    200200   21.3000  147.7600       7.7        92       773        95
VIS    2025250    200200   21.3000  147.7300       7.4        87       738        91
VIS    2025250    200200   21.2900  147.7000       8.4        95       715        90
VIS    2025250    200200   21.3100  147.5000       8.8        87       768        92
VIS    2025250    200200   21.2900  147.4700       8.7        88       834        91
VIS    2025250    200200   21.3000  147.4600       8.6        88       859        93
VIS    2025250    200200   21.2900  147.4400       8.6        85       875        92
VIS    2025250    200200   21.2900  147.1600      10.8        85       975        94
VIS    2025250    200200   21.2900  147.1200      12.8        81       937        95
VIS    2025250    200200   21.2900  147.1100      13.2        82       936        97
VIS    2025250    200200   21.2900  147.0300      13.4        78       960        99
VIS    2025250    200200   21.2900  147.0200      12.8        79       960       100
VIS    2025250    200200   21.3000  146.9500      12.5        87       889        96
VIS    2025250    200200   21.3000  146.9400      12.5        88       904        98
VIS    2025250    200200   21.2900  146.8900       9.7       104       907        95
VIS    2025250    200200   21.2900  146.8900       9.8       102       907        96
VIS    2025250    200200   21.3000  146.8600       9.3        98       827        98
VIS    2025250    200200   21.2800  146.8200      10.8       105       754        96
VIS    2025250    200200   21.3000  146.8100      10.3       105       754        97
VIS    2025250    200200   21.2900  146.7900      10.4       107       753        97
VIS    2025250    200200   21.2800  146.7600      10.4        96       756        94
VIS    2025250    200200   21.2800  146.6700      12.1        80       902        96
VIS    2025250    200200   21.2900  146.6600      11.5        81       894        96
VIS    2025250    200200   21.2900  146.6200      12.9        77       872        90
VIS    2025250    200200   21.2900  146.4800      15.1        79       886        90
VIS    2025250    200200   21.2900  146.4500      14.7        78       899        93
VIS    2025250    200200   21.2800  146.4200      14.5        79       902        94
VIS    2025250    200200   21.3000  146.4100      14.5        80       913        96
VIS    2025250    200200   21.2900  146.3700      15.5        85       899        93
VIS    2025250    200200   21.2800  146.3400      15.9        89       897        93
VIS    2025250    200200   21.2800  146.3400      15.7        89       894        93
VIS    2025250    200200   21.3000  146.3100      14.7        80       886        90
VIS    2025250    200200   21.3000  146.2000      14.8        80       876        90
VIS    2025250    200200   21.2800  146.1400      16.0        75       912        90
VIS    2025250    200200   21.2800  146.1100      15.7        79       954        94
VIS    2025250    200200   21.2800  146.0700      14.0        81       952        97
VIS    2025250    200200   21.2900  146.0500      14.1        81       952        99
VIS    2025250    200200   21.2800  146.0200      14.6        80       938        99
VIS    2025250    200200   21.2900  146.0000      14.7        82       935        99
VIS    2025250    200200   21.3000  145.9900      15.0        83       929        98
VIS    2025250    200200   21.3000  145.9500      15.5        83       907        93
VIS    2025250    200200   21.3000  145.9400      15.5        83       899        91
VIS    2025250    200200   21.2900  145.9000      13.6        87       891        92
VIS    2025250    200200   21.2900  145.8900      13.4        87       891        94
VIS    2025250    200200   21.2700  145.8500      14.3        82       888        93
VIS    2025250    200200   21.2700  145.8300      13.4        84       882        95
VIS    2025250    200200   21.2900  145.8200      12.5        85       882        96
VIS    2025250    200200   21.2600  144.1800      12.5       103       768        92
VIS    2025250    200200   21.2800  144.1500      13.0       108       772        93
VIS    2025250    200200   21.2800  144.1500      12.6       111       786        95
VIS    2025250    200200   21.2600  144.1100      11.2       117       831        98
VIS    2025250    200200   21.2600  144.0800      14.0        95       862        90
VIS    2025250    200200   21.2700  144.0500      14.8        98       886        93
VIS    2025250    200200   21.2600  144.0100      13.4       104       884        95
VIS    2025250    200200   21.2800  143.9800      12.6        95       880        93
VIS    2025250    200200   21.2700  143.8400      12.8       113       830        95
VIS    2025250    200200   21.2500  143.6900      13.2       115       701        94
VIS    2025250    200200   21.2500  142.8700      14.0        88       916        95
VIS    2025250    200200   21.2500  142.8600      14.0        88       935        98
VIS    2025250    200200   21.2500  142.8200      13.4        92       951        97
VIS    2025250    200200   21.2500  142.7900      13.8        89       958        97
VIS    2025250    200200   21.2600  142.7900      14.1        89       962        96
VIS    2025250    200200   21.2500  142.7400      13.5        90       958        98
VIS    2025250    200200   21.2500  142.7400      13.4        90       951        98
VIS    2025250    200200   21.2600  142.7100      13.2        87       951        98
VIS    2025250    200200   21.2700  142.6700      13.0        87       954        98
VIS    2025250    200200   21.2700  142.6700      13.0        87       954        98
VIS    2025250    200200   21.2500  142.6400      13.2        86       946        97
VIS    2025250    200200   21.2500  142.6100      13.2        86       941        96
VIS    2025250    200200   21.2700  142.5800      13.7        89       944        98
VIS    2025250    200200   21.2700  142.5600      13.6        89       958        98
VIS    2025250    200200   21.2500  142.5300      13.3        88       944        96
VIS    2025250    200200   21.2500  142.5200      13.3        86       944        97
VIS    2025250    200200   21.2500  142.4700      13.5        85       938        98
VIS    2025250    200200   21.2500  142.4600      13.4        87       937        98
VIS    2025250    200200   21.2600  142.4400      13.4        87       937        96
VIS    2025250    200200   21.2500  142.4000      13.5        89       964        95
VIS    2025250    200200   21.2500  142.3700      12.5        89       965        91
VIS    2025250    200200   21.3500  152.0000       6.2        78       970        97
VIS    2025250    200200   21.3500  152.0000       6.2        78       901        96
VIS    2025250    200200   21.3500  151.9500       5.3        92       894        91
VIS    2025250    200200   21.3500  151.9400       5.2        92       894        90
VIS    2025250    200200   21.3000  149.8300      10.8        81       926        92
VIS    2025250    200200   21.3000  149.8000      10.3        85       915        96
VIS    2025250    200200   21.3100  149.7900       9.9        87       918        97
VIS    2025250    200200   21.3000  149.7500      10.4        89       924        94
VIS    2025250    200200   21.3000  149.6400      10.7        84       927        93
VIS    2025250    200200   21.3100  149.6200      10.3        82       909        94
VIS    2025250    200200   21.2900  149.5900      10.4        79       896        92
VIS    2025250    200200   21.3100  149.5600       9.2        77       926        91
VIS    2025250    200200   21.2900  149.5100      10.7        79       954        91
VIS    2025250    200200   21.2900  149.4900      10.6        79       927        93
VIS    2025250    200200   21.3000  149.4700       9.7        77       905        95
VIS    2025250    200200   21.3000  149.4500       8.5        77       905        96
VIS    2025250    200200   21.2900  149.3900       8.2        76       964        96
VIS    2025250    200200   21.2900  149.3700       8.6        78       934        98
VIS    2025250    200200   21.2900  149.3400       9.9        87       909        95
VIS    2025250    200200   21.3100  149.3300       9.6        83       913        96
VIS    2025250    200200   21.3100  149.2900       9.2        87       889        98
VIS    2025250    200200   21.3000  149.2700       8.9        87       889        99
VIS    2025250    200200   21.2900  149.2500       8.8        86       889        99
VIS    2025250    200200   21.3100  149.2200       9.0        84       889        96
VIS    2025250    200200   21.3100  149.2000       8.7        83       889        97
VIS    2025250    200200   21.3000  149.1600       8.3        86       888        98
VIS    2025250    200200   21.2900  149.1300       8.7        89       889        97
VIS    2025250    200200   21.2900  149.1200       8.7        89       890        97
VIS    2025250    200200   21.3000  149.1000       8.7        87       889        97
VIS    2025250    200200   21.3000  149.0600       8.8        84       894        96
VIS    2025250    200200   21.3100  149.0500       8.6        84       894        97
VIS    2025250    200200   21.3100  149.0300       8.2        84       892        98
VIS    2025250    200200   21.3000  148.9900       8.1        86       898        97
VIS    2025250    200200   21.3100  148.9700       8.3        85       906        95
VIS    2025250    200200   21.3000  148.9400       8.1        75       921        98
VIS    2025250    200200   21.3000  148.9300       8.3        73       934        99
VIS    2025250    200200   21.3000  148.8800       9.7        77       947        98
VIS    2025250    200200   21.3000  148.8800       9.7        77       947        98
VIS    2025250    200200   21.3000  148.8500       9.7        80       922        96
VIS    2025250    200200   21.2800  148.8100      10.8        77       914        91
VIS    2025250    200200   21.2900  148.7900      10.7        77       911        91
VIS    2025250    200200   21.2800  148.7500       8.8        79       900        96
VIS    2025250    200200   21.2800  148.7500       8.6        78       897        96
VIS    2025250    200200   21.3000  148.7100       8.1        80       886        93
VIS    2025250    200200   21.2900  148.7000       8.2        79       877        93
VIS    2025250    200200   21.2800  148.6500       8.8        89       874        99
VIS    2025250    200200   21.2900  148.6400       8.9        89       876       100
VIS    2025250    200200   21.2800  148.6200       8.7        87       898        98
VIS    2025250    200200   21.3000  148.5900       8.8        84       901       100
VIS    2025250    200200   21.3000  148.5600       8.6        81       913        99
VIS    2025250    200200   21.2800  148.5300       7.8        85       909        98
VIS    2025250    200200   21.2900  148.5000       7.8        83       907        99
VIS    2025250    200200   21.2800  148.4800       7.9        81       906        99
VIS    2025250    200200   21.3000  148.4500       8.3        79       906        99
VIS    2025250    200200   21.2900  148.2200       7.6        65       996        94
VIS    2025250    200200   21.2900  148.1300       6.9        77       994        93
VIS    2025250    200200   21.2700  148.0700       6.6        98       927        90
VIS    2025250    200200   21.2900  148.0400       7.6       117       810        92
VIS    2025250    200200   21.2700  148.0200       7.7       111       810        97
VIS    2025250    200200   21.2900  148.0000       7.5        99       867        98
VIS    2025250    200200   21.2800  147.9700       7.4        95       848        96
VIS    2025250    200200   21.2700  147.9400       8.4        92       707        90
VIS    2025250    200200   21.2900  147.8600       8.7        94       837        98
VIS    2025250    200200   21.2700  147.8500       8.3       100       835       100
VIS    2025250    200200   21.2800  147.8200       8.4       102       823        97
VIS    2025250    200200   21.2900  147.7800       8.2        95       821        97
VIS    2025250    200200   21.2900  147.7600       7.8        92       773        95
VIS    2025250    200200   21.2700  147.7500       7.6        91       760        95
VIS    2025250    200200   21.2800  147.7300       7.4        86       738        91
VIS    2025250    200200   21.2900  147.7000       8.4        94       715        90
VIS    2025250    200200   21.2900  147.6800       9.2       101       714        90
VIS    2025250    200200   21.2800  147.6400       8.9        94       705        90
VIS    2025250    200200   21.2700  147.6300       8.5        92       708        90
VIS    2025250    200200   21.2900  147.5900       9.5        94       709        90
VIS    2025250    200200   21.2700  147.5000       9.0        89       768        90
VIS    2025250    200200   21.2800  147.4400       9.0        85       875        93
VIS    2025250    200200   21.2800  147.4200       9.2        85       878        96
VIS    2025250    200200   21.2600  147.1800      11.4        84       972        92
VIS    2025250    200200   21.2800  147.1600      10.9        85       972        92
VIS    2025250    200200   21.2800  147.1600      10.9        85       967        95
VIS    2025250    200200   21.2800  147.0800      12.3        81       936        94
VIS    2025250    200200   21.2800  147.0200      12.8        78       960        99
VIS    2025250    200200   21.2800  146.9900      11.0        86       947        98
VIS    2025250    200200   21.2800  146.9600      12.2        85       938       100
VIS    2025250    200200   21.2800  146.9500      11.6        88       938        99
VIS    2025250    200200   21.2600  146.9200       9.0       104       832        99
VIS    2025250    200200   21.2600  146.9000       9.2       110       783        99
VIS    2025250    200200   21.2700  146.8700      10.1       109       756        96
VIS    2025250    200200   21.2700  146.8300      11.3       106       746        95
VIS    2025250    200200   21.2700  146.7900      10.4       102       754        95
VIS    2025250    200200   21.2600  146.7600      10.8        87       813        91
VIS    2025250    200200   21.2700  146.6900      12.8        78       919        98
VIS    2025250    200200   21.2800  146.6700      12.2        79       902        96
VIS    2025250    200200   21.2600  146.6400      13.2        80       886        94
VIS    2025250    200200   21.2600  146.5800      15.8        82       886        94
VIS    2025250    200200   21.2800  146.5400      14.9        80       881        90
VIS    2025250    200200   21.2700  146.5100      14.1        82       886        92
VIS    2025250    200200   21.2700  146.5000      14.4        81       886        92
VIS    2025250    200200   21.2700  146.4800      15.0        79       886        90
VIS    2025250    200200   21.2600  146.4400      15.3        78       894        90
VIS    2025250    200200   21.2700  146.4200      14.7        79       902        94
VIS    2025250    200200   21.2700  146.3900      15.4        81       891        91
VIS    2025250    200200   21.2500  146.3600      15.9        84       897        96
VIS    2025250    200200   21.2600  146.3300      15.4        89       899        94
VIS    2025250    200200   21.2600  146.3300      15.2        88       897        94
VIS    2025250    200200   21.2600  146.2900      14.2        80       883        91
VIS    2025250    200200   21.2500  146.2800      14.1        76       881        90
VIS    2025250    200200   21.2600  146.2500      14.7        75       881        93
VIS    2025250    200200   21.2500  146.2100      15.9        74       890        90
VIS    2025250    200200   21.2500  146.2000      15.9        74       895        93
VIS    2025250    200200   21.2600  146.1600      16.3        74       902        90
VIS    2025250    200200   21.2500  146.1300      16.2        77       932        95
VIS    2025250    200200   21.2600  146.1300      16.2        76       934        95
VIS    2025250    200200   21.2500  146.0900      15.3        77       937        94
VIS    2025250    200200   21.2500  146.0600      14.3        81       950        99
VIS    2025250    200200   21.2600  146.0500      14.4        81       950        99
VIS    2025250    200200   21.2500  146.0200      15.5        81       950        98
VIS    2025250    200200   21.2500  145.9900      15.4        84       922        97
VIS    2025250    200200   21.2600  145.9600      14.8        81       909        96
VIS    2025250    200200   21.2600  145.9400      14.8        79       893        90
VIS    2025250    200200   21.2600  145.9300      14.7        79       893        90
VIS    2025250    200200   21.2500  145.8900      14.1        82       886        97
VIS    2025250    200200   21.2500  145.8700      14.0        82       877        92
VIS    2025250    200200   21.2600  145.8400      13.3        84       872        93
VIS    2025250    200200   21.2600  145.8300      12.6        85       870        93
VIS    2025250    200200   21.2500  144.1100      11.4       116       831        98
VIS    2025250    200200   21.2400  143.9900      13.0       105       804        91
VIS    2025250    200200   21.2400  143.9500      11.8       108       790        98
VIS    2025250    200200   21.2400  143.7000      13.3       107       708        94
VIS    2025250    200200   21.2300  143.6900      13.2       100       708        91
VIS    2025250    200200   21.2300  143.6500      12.0       119       701        97
VIS    2025250    200200   21.2400  142.8600      13.7        89       914        96
VIS    2025250    200200   21.2400  142.8500      13.7        89       932        99
VIS    2025250    200200   21.2400  142.8200      13.2        90       929        99
VIS    2025250    200200   21.2400  142.7800      14.0        88       958        97
VIS    2025250    200200   21.2300  142.7600      14.1        89       958        97
VIS    2025250    200200   21.2400  142.7400      13.7        90       958        99
VIS    2025250    200200   21.2300  142.6800      13.3        88       945        98
VIS    2025250    200200   21.2400  142.6700      13.4        87       945        97
VIS    2025250    200200   21.2400  142.6400      13.4        87       946        98
VIS    2025250    200200   21.2400  142.6200      13.3        86       947        97
VIS    2025250    200200   21.2400  142.6100      13.5        86       947        97
VIS    2025250    200200   21.2400  142.5800      13.5        88       944        99
VIS    2025250    200200   21.2200  142.5400      13.3        88       932        98
VIS    2025250    200200   21.2400  142.5200      13.2        87       943        97
VIS    2025250    200200   21.2400  142.4900      13.3        85       938        98
VIS    2025250    200200   21.2400  142.4600      13.4        86       938        98
VIS    2025250    200200   21.2400  142.4600      13.4        87       937        98
VIS    2025250    200200   21.2400  142.4300      13.6        88       953        96
VIS    2025250    200200   21.2300  142.4000      12.9        89       955        96
VIS    2025250    200200   21.2300  142.3800      12.3        89       955        97
VIS    2025250    200200   21.3200  152.0300       6.4        80       970        95
VIS    2025250    200200   21.3200  152.0100       6.7        80       950        96
VIS    2025250    200200   21.3200  151.9900       6.6        79       901        93
VIS    2025250    200200   21.3200  151.9600       6.1        77       888        93
VIS    2025250    200200   21.3000  151.9200       5.4        81       919        92
VIS    2025250    200200   21.2900  149.8400      11.2        79       926        91
VIS    2025250    200200   21.2900  149.8100      10.5        83       900        96
VIS    2025250    200200   21.2900  149.8000      10.3        85       915        96
VIS    2025250    200200   21.2800  149.7600      10.8        89       924        90
VIS    2025250    200200   21.2900  149.7400      10.5        88       924        91
VIS    2025250    200200   21.2900  149.6300      11.3        84       909        91
VIS    2025250    200200   21.2900  149.6200      11.3        84       909        91
VIS    2025250    200200   21.2800  149.5200      10.2        76       974        92
VIS    2025250    200200   21.2800  149.5000      10.6        79       929        92
VIS    2025250    200200   21.2800  149.4900      10.5        78       927        93
VIS    2025250    200200   21.2900  149.4500       8.1        75       905        95
VIS    2025250    200200   21.2800  149.4000       7.8        78       969        90
VIS    2025250    200200   21.2900  149.3700       8.5        78       957        98
VIS    2025250    200200   21.2800  149.3400       9.4        87       909        97
VIS    2025250    200200   21.2800  149.3300      10.1        88       905        95
VIS    2025250    200200   21.2700  149.3000      10.3        89       887        95
VIS    2025250    200200   21.2700  149.2700       9.0        88       888        99
VIS    2025250    200200   21.2700  149.2600       8.9        88       889        99
VIS    2025250    200200   21.2800  149.2200       8.8        84       889        96
VIS    2025250    200200   21.2800  149.2100       8.9        84       889        96
VIS    2025250    200200   21.2800  149.1700       8.6        89       888        97
VIS    2025250    200200   21.2600  149.1500       8.8        88       888        97
VIS    2025250    200200   21.2700  149.1200       8.8        88       891        97
VIS    2025250    200200   21.2600  149.0900       8.6        82       893        97
VIS    2025250    200200   21.2700  149.0600       8.9        80       893        95
VIS    2025250    200200   21.2600  149.0600       8.8        79       893        95
VIS    2025250    200200   21.2600  149.0200       7.3        73       894        97
VIS    2025250    200200   21.2800  148.9900       7.6        84       905        97
VIS    2025250    200200   21.2800  148.9600       8.1        77       933        95
VIS    2025250    200200   21.2800  148.8900       9.6        83       949        92
VIS    2025250    200200   21.2800  148.8800       9.6        79       947        97
VIS    2025250    200200   21.2800  148.8400       9.2        78       938        97
VIS    2025250    200200   21.2700  148.8200       9.8        76       943        94
VIS    2025250    200200   21.2800  148.7900      10.6        76       915        92
VIS    2025250    200200   21.2700  148.7800      10.3        76       916        93
VIS    2025250    200200   21.2800  148.7500       8.8        78       903        98
VIS    2025250    200200   21.2800  148.7300       8.3        75       896        95
VIS    2025250    200200   21.2700  148.6900       8.2        78       872        97
VIS    2025250    200200   21.2600  148.6600       8.7        89       872        99
VIS    2025250    200200   21.2800  148.6500       8.8        89       876        99
VIS    2025250    200200   21.2600  148.6200       8.7        86       889        92
VIS    2025250    200200   21.2600  148.6000       8.4        82       898        94
VIS    2025250    200200   21.2500  148.5800       7.9        83       891        98
VIS    2025250    200200   21.2700  148.5400       7.7        85       907        98
VIS    2025250    200200   21.2500  148.5100       7.7        85       911        99
VIS    2025250    200200   21.2600  148.5000       7.7        82       911        99
VIS    2025250    200200   21.2500  148.4600       8.4        79       906        99
VIS    2025250    200200   21.2500  148.4500       8.4        78       911        99
VIS    2025250    200200   21.2600  148.2000       7.5        79       996        93
VIS    2025250    200200   21.2600  148.1800       7.7        83       996        94
VIS    2025250    200200   21.2600  148.1400       7.6        95       994        91
VIS    2025250    200200   21.2500  148.0700       6.6        99       852        93
VIS    2025250    200200   21.2600  148.0300       7.4       111       810        98
VIS    2025250    200200   21.2500  148.0100       8.1       108       865        97
VIS    2025250    200200   21.2600  148.0000       7.9       105       867        97
VIS    2025250    200200   21.2500  147.9600       8.3        96       870        95
VIS    2025250    200200   21.2500  147.9400       8.8        94       755        95
VIS    2025250    200200   21.2500  147.9200       8.9        86       723        90
VIS    2025250    200200   21.2600  147.8900       8.9        82       750        90
VIS    2025250    200200   21.2600  147.8600       8.2        97       808        98
VIS    2025250    200200   21.2600  147.8500       8.2        99       826        99
VIS    2025250    200200   21.2700  147.8200       8.0       103       803        98
VIS    2025250    200200   21.2400  147.8000       8.8        90       803        96
VIS    2025250    200200   21.2400  147.7500       8.4        84       798        94
VIS    2025250    200200   21.2600  147.7400       7.4        90       760        94
VIS    2025250    200200   21.2600  147.7200       7.9        91       743        94
VIS    2025250    200200   21.2600  147.4400       9.8        84       867        94
VIS    2025250    200200   21.2400  147.2200      11.1        81       972        92
VIS    2025250    200200   21.2500  147.1900      10.8        85       972        92
VIS    2025250    200200   21.2500  147.1800      11.1        86       967        94
VIS    2025250    200200   21.2400  147.1500      11.2        86       905        99
VIS    2025250    200200   21.2600  147.1300      11.6        84       918        99
VIS    2025250    200200   21.2400  147.1000      11.2        86       910        92
VIS    2025250    200200   21.2600  147.0800      11.8        81       959        91
VIS    2025250    200200   21.2400  147.0100       9.5        89       945        92
VIS    2025250    200200   21.2500  146.9800       9.8        94       945        94
VIS    2025250    200200   21.2400  146.9400       9.7       103       845        99
VIS    2025250    200200   21.2500  146.9200       9.1       107       783        99
VIS    2025250    200200   21.2500  146.9100       9.3       109       776        99
VIS    2025250    200200   21.2500  146.8700      10.5       113       746        94
VIS    2025250    200200   21.2500  146.8100      11.8        99       812        95
VIS    2025250    200200   21.2500  146.7700      10.3        86       909        98
VIS    2025250    200200   21.2500  146.7600      12.3        81       909        98
VIS    2025250    200200   21.2300  146.7400      16.8        71       920        93
VIS    2025250    200200   21.2300  146.7100      16.0        68       920        90
VIS    2025250    200200   21.2400  146.6700      13.7        78       890        97
VIS    2025250    200200   21.2500  146.6500      13.3        81       886        98
VIS    2025250    200200   21.2500  146.6200      14.3        82       886        97
VIS    2025250    200200   21.2400  146.6100      14.8        84       889        97
VIS    2025250    200200   21.2500  146.5800      15.7        82       886        90
VIS    2025250    200200   21.2500  146.5500      14.7        81       884        96
VIS    2025250    200200   21.2300  146.5200      14.2        79       886        96
VIS    2025250    200200   21.2400  146.5000      14.8        81       890        96
VIS    2025250    200200   21.2300  146.4900      15.1        80       892        96
VIS    2025250    200200   21.2300  146.4500      15.3        77       892        95
VIS    2025250    200200   21.2300  146.4300      15.2        79       892        95
VIS    2025250    200200   21.2400  146.4000      15.2        81       892        96
VIS    2025250    200200   21.2400  146.3700      15.7        82       896        96
VIS    2025250    200200   21.2400  146.3600      15.8        83       906        97
VIS    2025250    200200   21.2400  146.3400      15.3        84       906        94
VIS    2025250    200200   21.2400  146.3000      14.4        80       890        97
VIS    2025250    200200   21.2400  146.2800      14.1        77       886        96
VIS    2025250    200200   21.2400  146.2400      15.3        73       888        93
VIS    2025250    200200   21.2300  146.2200      16.0        70       900        92
VIS    2025250    200200   21.2500  146.2100      15.9        73       896        93
VIS    2025250    200200   21.2500  146.1700      16.3        74       902        91
VIS    2025250    200200   21.2300  146.1600      16.6        73       902        93
VIS    2025250    200200   21.2400  146.1400      16.4        76       919        96
VIS    2025250    200200   21.2400  146.1000      15.7        77       926        97
VIS    2025250    200200   21.2300  146.0800      15.0        78       916        98
VIS    2025250    200200   21.2400  146.0600      14.7        80       926        98
VIS    2025250    200200   21.2400  146.0200      15.6        82       927        98
VIS    2025250    200200   21.2400  146.0000      15.5        83       922        98
VIS    2025250    200200   21.2300  145.9700      15.1        87       837        91
VIS    2025250    200200   21.2400  145.9500      14.9        81       893        97
VIS    2025250    200200   21.2300  145.9000      13.6        83       867        91
VIS    2025250    200200   21.2200  145.8800      14.0        84       812        91
VIS    2025250    200200   21.2300  145.8600      13.6        84       854        94
VIS    2025250    200200   21.2200  143.9800      10.9       108       797        98
VIS    2025250    200200   21.2200  143.9500      11.1       102       786        95
VIS    2025250    200200   21.2100  143.9300      12.5        93       779        90
VIS    2025250    200200   21.2100  143.9200      11.4        94       777        92
VIS    2025250    200200   21.2300  143.8800      12.4       101       764        94
VIS    2025250    200200   21.2300  143.8700      13.4       100       764        91
VIS    2025250    200200   21.2200  143.6900      13.6        97       708        90
VIS    2025250    200200   21.2200  143.6700      12.4       107       706        95
VIS    2025250    200200   21.2200  143.6500      12.1       116       701        96
VIS    2025250    200200   21.2100  142.8200      12.6        88       926        97
VIS    2025250    200200   21.2000  142.8000      13.5        88       926        95
VIS    2025250    200200   21.2200  142.7700      13.9        88       943        97
VIS    2025250    200200   21.2000  142.7600      14.1        86       919        95
VIS    2025250    200200   21.2200  142.6800      13.5        88       943        97
VIS    2025250    200200   21.2000  142.6400      13.7        91       948        99
VIS    2025250    200200   21.2000  142.6300      13.8        92       952        99
VIS    2025250    200200   21.2200  142.6000      13.9        87       953        99
VIS    2025250    200200   21.2000  142.5700      14.5        86       950        98
VIS    2025250    200200   21.2100  142.5600      14.1        86       932        97
VIS    2025250    200200   21.2000  142.4700      13.2        87       936        99
VIS    2025250    200200   21.2000  142.4700      13.2        86       938        99
VIS    2025250    200200   21.2000  142.4400      13.4        87       938        97
VIS    2025250    200200   21.2100  142.4200      13.6        87       939        96
VIS    2025250    200200   21.2000  142.3800      12.4        87       939        97
VIS    2025250    200200   21.2800  152.0200       5.5        84       971        95
VIS    2025250    200200   21.2800  152.0000       5.8        84       962        96
VIS    2025250    200200   21.2900  151.9900       6.3        82       962        92
VIS    2025250    200200   21.3000  151.9500       5.8        75       895        97
VIS    2025250    200200   21.2800  151.9200       5.7        79       919        94
VIS    2025250    200200   21.2700  149.8400      11.3        80       905        92
VIS    2025250    200200   21.2600  149.8300      10.9        81       905        93
VIS    2025250    200200   21.2600  149.8000      10.4        83       918        93
VIS    2025250    200200   21.2500  149.4900      10.2        76       929        93
VIS    2025250    200200   21.2400  149.4700       9.6        77       902        96
VIS    2025250    200200   21.2600  149.3600       9.1        86       930        97
VIS    2025250    200200   21.2400  149.3500       9.6        87       930        92
VIS    2025250    200200   21.2500  149.3300      10.2        88       892        95
VIS    2025250    200200   21.2400  149.2900       9.6        87       889        97
VIS    2025250    200200   21.2600  149.2600       9.0        88       889        99
VIS    2025250    200200   21.2400  149.2300       9.0        89       889        98
VIS    2025250    200200   21.2500  149.2000       8.8        87       888        97
VIS    2025250    200200   21.2400  149.1800       8.6        87       838        96
VIS    2025250    200200   21.2400  149.1700       8.5        87       845        97
VIS    2025250    200200   21.2500  149.1500       8.9        88       888        96
VIS    2025250    200200   21.2500  149.1100       8.8        84       886        98
VIS    2025250    200200   21.2600  149.0900       8.6        82       891        97
VIS    2025250    200200   21.2500  149.0600       8.9        80       892        95
VIS    2025250    200200   21.2500  149.0500       8.5        79       892        98
VIS    2025250    200200   21.2500  149.0000       7.0        74       896        97
VIS    2025250    200200   21.2600  148.9800       7.5        86       911        93
VIS    2025250    200200   21.2300  148.9700       8.2        98       950        90
VIS    2025250    200200   21.2400  148.8500       7.9        81       942        99
VIS    2025250    200200   21.2300  148.8200       8.6        78       971       100
VIS    2025250    200200   21.2500  148.8000      10.2        78       943        94
VIS    2025250    200200   21.2400  148.7700       8.9        84       927        97
VIS    2025250    200200   21.2300  148.7600       8.5        83       910        97
VIS    2025250    200200   21.2500  148.7300       8.1        70       886        93
VIS    2025250    200200   21.2400  148.7200       7.9        69       876        94
VIS    2025250    200200   21.2300  148.6700       9.0        88       872       100
VIS    2025250    200200   21.2300  148.6600       8.9        88       874       100
VIS    2025250    200200   21.2500  148.6200       8.7        85       888        93
VIS    2025250    200200   21.2500  148.6100       8.6        84       889        96
VIS    2025250    200200   21.2500  148.5900       8.3        82       891        98
VIS    2025250    200200   21.2500  148.5500       7.5        88       906        97
VIS    2025250    200200   21.2500  148.5400       7.5        89       910        97
VIS    2025250    200200   21.2300  148.4900       8.1        83       907        98
VIS    2025250    200200   21.2300  148.4900       8.3        82       907        99
VIS    2025250    200200   21.2500  148.4500       8.5        79       911        99
VIS    2025250    200200   21.2200  148.1800       8.3        68       986        91
VIS    2025250    200200   21.2300  148.1600       8.0        92       977        91
VIS    2025250    200200   21.2400  148.0500       6.6        99       852        95
VIS    2025250    200200   21.2400  148.0200       7.7       110       865        94
VIS    2025250    200200   21.2400  148.0000       8.0       103       881        97
VIS    2025250    200200   21.2400  147.9700       8.3        97       874        97
VIS    2025250    200200   21.2300  147.9500       9.2        96       837        97
VIS    2025250    200200   21.2300  147.8900       7.6        87       774        90
VIS    2025250    200200   21.2400  147.8600       8.2        93       795        97
VIS    2025250    200200   21.2400  147.8500       8.3        95       780        97
VIS    2025250    200200   21.2400  147.8200       7.5        97       780        97
VIS    2025250    200200   21.2300  147.7800       9.8        80       823        93
VIS    2025250    200200   21.2300  147.7800       9.9        79       834        94
VIS    2025250    200200   21.2400  147.7500       8.6        83       798        93
VIS    2025250    200200   21.2400  147.7200       7.9        90       752        93
VIS    2025250    200200   21.2300  147.6900       8.4        92       706        91
VIS    2025250    200200   21.2200  147.6600      10.3        97       705        91
VIS    2025250    200200   21.2200  147.6500      10.6        98       706        90
VIS    2025250    200200   21.2400  147.6300       9.9        98       709        92
VIS    2025250    200200   21.2300  147.5900      10.8       103       706        90
VIS    2025250    200200   21.2200  147.5600      10.2        98       707        93
VIS    2025250    200200   21.2200  147.5500       9.8        96       709        93
VIS    2025250    200200   21.2300  147.5200       9.0        92       739        96
VIS    2025250    200200   21.2200  147.5000       8.6        89       746        94
VIS    2025250    200200   21.2200  147.4700       9.5        85       772        93
VIS    2025250    200200   21.2200  147.3600      10.8        80       999        97
VIS    2025250    200200   21.2200  147.3400      11.1        78       983        96
VIS    2025250    200200   21.2200  147.3300      11.7        78       983        93
VIS    2025250    200200   21.2200  147.3000      12.6        80       983        93
VIS    2025250    200200   21.2100  147.2600      12.7        79       981        95
VIS    2025250    200200   21.2200  147.2400      12.4        81       979        94
VIS    2025250    200200   21.2300  147.2300      11.8        80       977        91
VIS    2025250    200200   21.2200  147.2000      11.0        83       925        92
VIS    2025250    200200   21.2100  147.1600      10.6        88       903        98
VIS    2025250    200200   21.2100  147.1400      10.5        89       903        98
VIS    2025250    200200   21.2300  147.1100      10.9        90       899        95
VIS    2025250    200200   21.2300  147.1000      11.0        89       899        95
VIS    2025250    200200   21.2200  147.0100       9.3        92       928        91
VIS    2025250    200200   21.2100  146.9800       9.8        95       928        94
VIS    2025250    200200   21.2100  146.9500      10.0       101       796        98
VIS    2025250    200200   21.2100  146.9500      10.0       103       796        99
VIS    2025250    200200   21.2300  146.9200       9.4       108       776       100
VIS    2025250    200200   21.2200  146.9000       9.6       111       747        99
VIS    2025250    200200   21.2100  146.8700       9.5       104       746        97
VIS    2025250    200200   21.2200  146.8300      12.3        85       928        99
VIS    2025250    200200   21.2200  146.8200      12.4        86       928        96
VIS    2025250    200200   21.2100  146.8000      12.5        77       903        98
VIS    2025250    200200   21.2100  146.7600      14.4        69       888        91
VIS    2025250    200200   21.2200  146.7500      15.2        72       910        94
VIS    2025250    200200   21.2100  146.7200      15.8        73       910        94
VIS    2025250    200200   21.2200  146.6800      15.4        67       896        91
VIS    2025250    200200   21.2200  146.6700      14.8        71       891        92
VIS    2025250    200200   21.2200  146.6400      14.9        82       888        96
VIS    2025250    200200   21.2300  146.6100      15.0        83       889        96
VIS    2025250    200200   21.2300  146.6000      15.0        82       888        96
VIS    2025250    200200   21.2200  146.5500      14.5        78       886        94
VIS    2025250    200200   21.2200  146.5500      14.4        78       886        93
VIS    2025250    200200   21.2100  146.5000      15.3        81       888        95
VIS    2025250    200200   21.2100  146.4800      15.4        81       892        96
VIS    2025250    200200   21.2100  146.4600      15.2        79       890        95
VIS    2025250    200200   21.2200  146.4500      15.2        78       890        95
VIS    2025250    200200   21.2100  146.4000      15.2        80       888        95
VIS    2025250    200200   21.2000  146.3900      15.3        80       888        95
VIS    2025250    200200   21.2200  146.3600      15.4        81       896        96
VIS    2025250    200200   21.2100  146.3300      15.1        81       896        96
VIS    2025250    200200   21.2000  146.3200      15.6        78       896        94
VIS    2025250    200200   21.2000  146.2800      16.2        78       892        93
VIS    2025250    200200   21.2100  146.2700      15.8        77       890        93
VIS    2025250    200200   21.2000  146.2300      15.8        73       900        94
VIS    2025250    200200   21.2200  146.2200      16.1        71       900        93
VIS    2025250    200200   21.2000  146.1800      17.1        71       894        91
VIS    2025250    200200   21.2200  146.1600      16.8        73       902        93
VIS    2025250    200200   21.2200  146.1300      15.9        79       898        96
VIS    2025250    200200   21.2200  146.1200      15.7        80       898        96
VIS    2025250    200200   21.2200  146.0800      15.0        79       894        96
VIS    2025250    200200   21.2100  146.0700      15.2        80       894        96
VIS    2025250    200200   21.2200  146.0400      15.2        83       938        98
VIS    2025250    200200   21.2200  146.0200      15.0        84       922        98
VIS    2025250    200200   21.1900  144.1300      14.0        95       803        90
VIS    2025250    200200   21.1900  144.0100       9.3        97       810        93
VIS    2025250    200200   21.1900  143.6400      11.2       107       775        96
VIS    2025250    200200   21.1900  143.6400      11.3       109       775        96
VIS    2025250    200200   21.1800  143.5700      12.6       107       797        92
VIS    2025250    200200   21.1900  142.8100      13.3        87       926        95
VIS    2025250    200200   21.1900  142.7800      13.8        86       919        94
VIS    2025250    200200   21.1800  142.7700      13.9        85       915        94
VIS    2025250    200200   21.1900  142.6600      13.7        90       943        99
VIS    2025250    200200   21.1700  142.6300      13.3        91       905        94
VIS    2025250    200200   21.1800  142.5900      13.7        89       950        98
VIS    2025250    200200   21.1900  142.4800      13.5        88       905        93
VIS    2025250    200200   21.1900  142.4700      13.1        87       936        99
VIS    2025250    200200   21.1800  142.4500      13.0        86       935        98
VIS    2025250    200200   21.1900  142.4300      13.2        87       936        97
VIS    2025250    200200   21.1700  142.3900      12.5        87       926        98
VIS    2025250    200200   21.1700  142.3800      12.4        87       933        99
VIS    2025250    200200   21.2600  152.0300       5.0        81       960        95
VIS    2025250    200200   21.2800  151.9900       5.5        83       962        90
VIS    2025250    200200   21.2700  151.9600       6.1        83       966        96
VIS    2025250    200200   21.2500  151.9200       5.4        79       932        97
VIS    2025250    200200   21.2200  149.5000       9.8        79       936        91
VIS    2025250    200200   21.2300  149.4700       9.6        78       902        96
VIS    2025250    200200   21.2400  149.4500       8.7        80       902        94
VIS    2025250    200200   21.2300  149.4300       8.5        82       940        90
VIS    2025250    200200   21.2200  149.3800       9.4        84       951        91
VIS    2025250    200200   21.2300  149.3800       9.5        85       951        90
VIS    2025250    200200   21.2200  149.3400      10.3        90       921        91
VIS    2025250    200200   21.2200  149.3100       9.7        87       891        97
VIS    2025250    200200   21.2300  149.2900       9.4        87       889        97
VIS    2025250    200200   21.2300  149.2800       9.2        87       890        98
VIS    2025250    200200   21.2100  149.2500       9.2        84       889        98
VIS    2025250    200200   21.2200  149.2100       9.0        89       832        97
VIS    2025250    200200   21.2200  149.2000       8.9        88       829        96
VIS    2025250    200200   21.2200  149.1700       8.5        85       838        96
VIS    2025250    200200   21.2200  149.1300       8.6        86       838        94
VIS    2025250    200200   21.2200  149.1300       8.7        87       836        95
VIS    2025250    200200   21.2100  149.0900       8.7        88       835        91
VIS    2025250    200200   21.2200  149.0800       8.8        83       835        94
VIS    2025250    200200   21.2300  149.0500       8.6        80       860        96
VIS    2025250    200200   21.2200  149.0100       7.7        77       878        98
VIS    2025250    200200   21.2100  148.8600       8.7        96       921        93
VIS    2025250    200200   21.2300  148.8300       8.4        79       959        99
VIS    2025250    200200   21.2100  148.8100       8.5        81       954        99
VIS    2025250    200200   21.2100  148.7800       8.4        84       901        98
VIS    2025250    200200   21.2300  148.7600       8.4        83       910        97
VIS    2025250    200200   21.2200  148.7500       8.1        79       878        95
VIS    2025250    200200   21.2100  148.7000       8.7        78       870        96
VIS    2025250    200200   21.2100  148.6700       9.1        84       872       100
VIS    2025250    200200   21.2100  148.6700       9.1        85       874       100
VIS    2025250    200200   21.2300  148.6500       8.6        83       875        98
VIS    2025250    200200   21.2100  148.6000       8.8        77       879        99
VIS    2025250    200200   21.2100  148.5700       8.7        76       883        99
VIS    2025250    200200   21.2100  148.5700       8.5        76       885        99
VIS    2025250    200200   21.2000  148.5400       8.2        77       899        98
VIS    2025250    200200   21.2200  148.5000       8.2        83       907        98
VIS    2025250    200200   21.2100  148.4900       8.4        82       907        99
VIS    2025250    200200   21.2200  148.4500       8.6        78       911        99
VIS    2025250    200200   21.2200  148.2100       9.1        56       985        91
VIS    2025250    200200   21.2100  148.2000       9.0        59       985        92
VIS    2025250    200200   21.2000  148.1500       9.0        98       946        92
VIS    2025250    200200   21.2000  148.0200       7.5        92       883        97
VIS    2025250    200200   21.2000  148.0200       7.3        95       883        96
VIS    2025250    200200   21.2100  147.9700       8.6       100       880        96
VIS    2025250    200200   21.2100  147.9500       9.8        98       870        95
VIS    2025250    200200   21.2200  147.8900       7.7        92       774        92
VIS    2025250    200200   21.2100  147.8600       9.1        93       766        96
VIS    2025250    200200   21.1900  147.8400       9.3        90       770        96
VIS    2025250    200200   21.1900  147.8100       9.7        83       834        94
VIS    2025250    200200   21.2100  147.7900      10.2        80       834        94
VIS    2025250    200200   21.1900  147.7600      10.4        87       867        97
VIS    2025250    200200   21.2100  147.7400       8.8        86       792        91
VIS    2025250    200200   21.2000  147.7200       8.2        95       706        92
VIS    2025250    200200   21.2100  147.6800       9.5        98       701        93
VIS    2025250    200200   21.2000  147.6200      10.7        99       706        90
VIS    2025250    200200   21.2100  147.6200      10.7       100       706        90
VIS    2025250    200200   21.1900  147.5700       9.7        97       709        95
VIS    2025250    200200   21.1900  147.5600       9.6        97       709        95
VIS    2025250    200200   21.1900  147.5300       8.8        89       739        94
VIS    2025250    200200   21.2000  147.4900       8.8        87       750        94
VIS    2025250    200200   21.2100  147.4800       8.9        88       768        95
VIS    2025250    200200   21.1900  147.4400       9.2        84       794        93
VIS    2025250    200200   21.1900  147.4400       9.4        83       794        93
VIS    2025250    200200   21.1900  147.4100       9.4        80       938        93
VIS    2025250    200200   21.1900  147.3500      10.8        82       983        97
VIS    2025250    200200   21.2000  147.3400      11.4        77       983        97
VIS    2025250    200200   21.1900  147.2900      12.8        79       986        95
VIS    2025250    200200   21.1900  147.2800      12.4        83       987        94
VIS    2025250    200200   21.2000  147.2600      12.7        80       984        94
VIS    2025250    200200   21.1900  147.2300      12.9        84       936        99
VIS    2025250    200200   21.1900  147.2100      12.5        86       925        98
VIS    2025250    200200   21.1900  147.1800      11.0        91       910        94
VIS    2025250    200200   21.2000  147.1200      10.1        92       899        93
VIS    2025250    200200   21.2000  147.1100      10.1        93       899        92
VIS    2025250    200200   21.2000  147.0600      10.1        99       812        98
VIS    2025250    200200   21.1900  147.0200      10.4        94       910        96
VIS    2025250    200200   21.1800  146.9900       9.4        93       910        95
VIS    2025250    200200   21.1900  146.9700       9.8        98       796        98
VIS    2025250    200200   21.2000  146.9600       9.9        98       796        97
VIS    2025250    200200   21.2000  146.9300       9.6       103       736        98
VIS    2025250    200200   21.1900  146.8900       9.6       101       749        93
VIS    2025250    200200   21.2000  146.8900       9.5       101       749        94
VIS    2025250    200200   21.1800  146.8400       9.5        88       943        93
VIS    2025250    200200   21.1800  146.8400       9.6        88       943        94
VIS    2025250    200200   21.2000  146.7700      14.2        68       885        91
VIS    2025250    200200   21.1900  146.7500      14.8        73       892        93
VIS    2025250    200200   21.2000  146.7300      15.4        75       899        94
VIS    2025250    200200   21.2000  146.7100      15.5        72       898        92
VIS    2025250    200200   21.1800  146.6700      15.7        74       888        92
VIS    2025250    200200   21.1900  146.6600      15.3        78       888        94
VIS    2025250    200200   21.2000  146.6300      15.3        85       886        95
VIS    2025250    200200   21.1900  146.6100      14.9        86       884        96
VIS    2025250    200200   21.1900  146.5900      15.1        81       884        94
VIS    2025250    200200   21.1800  146.5400      14.6        79       881        94
VIS    2025250    200200   21.1800  146.5400      14.7        80       881        95
VIS    2025250    200200   21.1800  146.5100      15.4        81       882        93
VIS    2025250    200200   21.2000  146.4800      15.3        80       888        95
VIS    2025250    200200   21.2000  146.4600      15.2        79       888        95
VIS    2025250    200200   21.2000  146.4400      14.7        80       886        96
VIS    2025250    200200   21.2000  146.3900      15.3        80       888        95
VIS    2025250    200200   21.2000  146.3700      15.7        80       890        95
VIS    2025250    200200   21.1800  146.3600      15.9        80       890        94
VIS    2025250    200200   21.1900  146.3300      16.0        78       896        94
VIS    2025250    200200   21.1900  146.3100      16.5        78       892        92
VIS    2025250    200200   21.2000  146.2800      16.6        78       892        93
VIS    2025250    200200   21.1800  146.2400      16.2        73       890        92
VIS    2025250    200200   21.1800  146.2300      15.9        74       894        94
VIS    2025250    200200   21.1900  146.2100      16.0        75       900        94
VIS    2025250    200200   21.2000  146.1700      17.4        71       891        90
VIS    2025250    200200   21.1600  144.0000      13.4        93       832        91
VIS    2025250    200200   21.1600  144.0000      13.2        93       832        91
VIS    2025250    200200   21.1600  143.8500      14.0       101       798        90
VIS    2025250    200200   21.1700  143.8000      14.3       103       796        90
VIS    2025250    200200   21.1600  143.6600      10.6       117       781        98
VIS    2025250    200200   21.1500  143.6400      10.7       113       777        96
VIS    2025250    200200   21.1600  143.6300      10.3       113       775        98
VIS    2025250    200200   21.1700  143.5700      12.1       109       797        92
VIS    2025250    200200   21.1600  142.4800      13.5        91       905        93
VIS    2025250    200200   21.1700  142.4600      13.0        89       933        99
VIS    2025250    200200   21.1600  142.3800      12.3        87       926        98
VIS    2025250    200200   21.1500  142.3700      12.3        88       926        98
VIS    2025250    200200   21.2400  152.0300       4.9        82       944        96
VIS    2025250    200200   21.2300  151.9400       5.9        85       962        99
VIS    2025250    200200   21.2400  151.8900       4.9        74       932        90
VIS    2025250    200200   21.2000  149.7600       9.9        81       948        92
VIS    2025250    200200   21.2000  149.7300      10.2        80       935        91
VIS    2025250    200200   21.2000  149.7000      10.6        81       928        90
VIS    2025250    200200   21.1900  149.6600      10.3        81       941        90
VIS    2025250    200200   21.2000  149.6300       9.9        82       951        90
VIS    2025250    200200   21.1900  149.6000       9.2        81       947        92
VIS    2025250    200200   21.2000  149.5700       9.9        82       946        90
VIS    2025250    200200   21.2100  149.5300       9.3        83       956        91
VIS    2025250    200200   21.2000  149.5100       9.3        80       956        91
VIS    2025250    200200   21.1900  149.4900       9.6        77       925        94
VIS    2025250    200200   21.1900  149.4500       8.7        77       916        97
VIS    2025250    200200   21.2100  149.4300       8.5        82       920        96
VIS    2025250    200200   21.1900  149.3700       9.5        86       921        94
VIS    2025250    200200   21.2000  149.3500      10.1        90       921        91
VIS    2025250    200200   21.1900  149.3300      10.0        88       892        96
VIS    2025250    200200   21.2100  149.3100       9.5        87       892        97
VIS    2025250    200200   21.1900  149.2900       9.5        85       891        97
VIS    2025250    200200   21.2000  149.2500       9.2        82       856        99
VIS    2025250    200200   21.2000  149.2200       9.1        85       835        95
VIS    2025250    200200   21.2000  149.2000       9.1        86       832        95
VIS    2025250    200200   21.2100  149.1700       8.4        83       845        95
VIS    2025250    200200   21.2000  149.1500       8.0        79       854        96
VIS    2025250    200200   21.2100  149.1200       8.5        88       836        93
VIS    2025250    200200   21.2000  149.1100       8.6        89       836        93
VIS    2025250    200200   21.2000  149.0900       8.7        89       835        92
VIS    2025250    200200   21.2000  149.0600       8.5        85       842        97
VIS    2025250    200200   21.1800  149.0300       8.2        83       872        99
VIS    2025250    200200   21.1800  149.0100       7.8        91       897        91
VIS    2025250    200200   21.1800  148.9200       8.3       103       888        92
VIS    2025250    200200   21.1800  148.8900       8.5        89       902        93
VIS    2025250    200200   21.1900  148.8900       7.7        98       905        93
VIS    2025250    200200   21.1800  148.8400       9.1        85       932        97
VIS    2025250    200200   21.1900  148.8300       8.9        85       938        98
VIS    2025250    200200   21.1900  148.7900       8.3        80       901        99
VIS    2025250    200200   21.2000  148.7800       8.3        82       901        99
VIS    2025250    200200   21.1900  148.7600       8.5        78       877        93
VIS    2025250    200200   21.1900  148.7300       8.6        81       874        99
VIS    2025250    200200   21.2000  148.6900       8.8        82       872        98
VIS    2025250    200200   21.2000  148.6700       9.0        84       874       100
VIS    2025250    200200   21.2000  148.6600       8.9        83       876        99
VIS    2025250    200200   21.1800  148.6100       8.6        74       880        98
VIS    2025250    200200   21.1800  148.6100       8.8        73       881        98
VIS    2025250    200200   21.1800  148.5800       8.9        72       885        98
VIS    2025250    200200   21.1900  148.5500       8.2        71       899        97
VIS    2025250    200200   21.1800  148.5200       8.1        76       909        98
VIS    2025250    200200   21.1800  148.4800       8.4        79       899        99
VIS    2025250    200200   21.1900  148.4700       8.5        79       903        99
VIS    2025250    200200   21.1700  148.2900       7.6        76       967        96
VIS    2025250    200200   21.1800  148.2800       7.7        77       967        96
VIS    2025250    200200   21.1800  148.2600       8.0        83       969        93
VIS    2025250    200200   21.1800  148.2200       9.9        73       985        99
VIS    2025250    200200   21.1800  148.1400       8.5        98       942        91
VIS    2025250    200200   21.1900  148.1300       8.5       100       946        90
VIS    2025250    200200   21.1800  148.0600       7.5       104       860        96
VIS    2025250    200200   21.1900  148.0400       7.9        96       880        97
VIS    2025250    200200   21.1900  148.0200       7.5        88       883        97
VIS    2025250    200200   21.1700  147.9800       8.3        88       874        95
VIS    2025250    200200   21.1700  147.9600      10.1        94       871        95
VIS    2025250    200200   21.1700  147.9400      10.5        94       871        94
VIS    2025250    200200   21.1800  147.9100       8.6       101       865        93
VIS    2025250    200200   21.1800  147.9000       8.3        97       859        98
VIS    2025250    200200   21.1700  147.8700       9.0        92       831        99
VIS    2025250    200200   21.1700  147.8300       9.1        86       842        97
VIS    2025250    200200   21.1700  147.8300       9.3        85       842        97
VIS    2025250    200200   21.1700  147.7800      11.4        91       877        97
VIS    2025250    200200   21.1800  147.7800      11.3        90       877        97
VIS    2025250    200200   21.1800  147.7500       9.8        93       857        97
VIS    2025250    200200   21.1700  147.7300       9.4       100       718        93
VIS    2025250    200200   21.1900  147.6800      10.1       105       700        93
VIS    2025250    200200   21.1800  147.6600      10.9       106       701        90
VIS    2025250    200200   21.1800  147.6300      10.3       101       702        90
VIS    2025250    200200   21.1900  147.6300      10.2       101       702        91
VIS    2025250    200200   21.1700  147.5900       9.4        97       709        95
VIS    2025250    200200   21.1800  147.5800       9.5        97       709        95
VIS    2025250    200200   21.1800  147.5300       8.8        88       740        94
VIS    2025250    200200   21.1900  147.5300       8.8        88       741        94
VIS    2025250    200200   21.1700  147.4800       9.3        84       774        92
VIS    2025250    200200   21.1800  147.4800       9.3        84       774        92
VIS    2025250    200200   21.1800  147.4400       9.2        82       804        92
VIS    2025250    200200   21.1800  147.4100       9.4        80       938        95
VIS    2025250    200200   21.1700  147.4000       9.8        83       979        95
VIS    2025250    200200   21.1600  147.3700      10.4        88       979        93
VIS    2025250    200200   21.1600  147.3300      12.0        79       957        93
VIS    2025250    200200   21.1800  147.2800      12.4        83       987        96
VIS    2025250    200200   21.1800  147.2300      13.1        86       939        98
VIS    2025250    200200   21.1800  147.2300      13.1        86       936        98
VIS    2025250    200200   21.1600  147.1900      12.4        89       928        96
VIS    2025250    200200   21.1800  147.1200      10.2        92       929        91
VIS    2025250    200200   21.1600  147.1000       9.3        94       925        91
VIS    2025250    200200   21.1700  147.0600       9.9        97       826        97
VIS    2025250    200200   21.1800  147.0400      11.2        96       848        94
VIS    2025250    200200   21.1600  147.0200      11.1        88       910        99
VIS    2025250    200200   21.1800  146.9900       9.3        95       889        96
VIS    2025250    200200   21.1800  146.9700       9.6        99       729        96
VIS    2025250    200200   21.1700  146.9500       9.7        99       719        90
VIS    2025250    200200   21.1800  146.9100       9.7       100       733        94
VIS    2025250    200200   21.1800  146.9000       9.8       100       733        93
VIS    2025250    200200   21.1700  146.8600       9.5        90       905        95
VIS    2025250    200200   21.1600  146.8300      10.4        82       905        92
VIS    2025250    200200   21.1600  146.8200      10.4        82       903        91
VIS    2025250    200200   21.1700  146.7600      13.6        76       878        93
VIS    2025250    200200   21.1700  146.7400      14.5        79       892        96
VIS    2025250    200200   21.1600  146.7200      14.8        79       892        96
VIS    2025250    200200   21.1800  146.7000      15.5        73       890        92
VIS    2025250    200200   21.1800  146.6700      16.0        73       888        91
VIS    2025250    200200   21.1700  146.6500      15.7        80       886        94
VIS    2025250    200200   21.1600  146.6200      15.2        84       884        95
VIS    2025250    200200   21.1600  146.6000      14.5        85       884        96
VIS    2025250    200200   21.1700  146.5600      15.1        79       881        94
VIS    2025250    200200   21.1700  146.5400      14.8        80       881        95
VIS    2025250    200200   21.1700  146.5200      15.2        80       881        93
VIS    2025250    200200   21.1700  146.4900      15.3        78       882        93
VIS    2025250    200200   21.1600  146.4700      15.1        76       881        93
VIS    2025250    200200   21.1500  146.4400      15.0        72       879        90
VIS    2025250    200200   21.1600  146.4000      14.6        80       882        96
VIS    2025250    200200   21.1600  146.4000      14.7        80       882        96
VIS    2025250    200200   21.1700  146.3600      15.9        80       888        94
VIS    2025250    200200   21.1700  146.3300      16.5        80       892        93
VIS    2025250    200200   21.1700  146.3300      16.6        80       892        93
VIS    2025250    200200   21.1500  146.2900      16.5        81       886        93
VIS    2025250    200200   21.1600  146.2600      16.2        77       886        92
VIS    2025250    200200   21.1500  146.2300      15.6        74       885        93
VIS    2025250    200200   21.1600  146.2200      15.5        75       889        94
VIS    2025250    200200   21.1500  144.6400      12.5        91       710        92
VIS    2025250    200200   21.1400  144.6300      13.1        91       710        91
VIS    2025250    200200   21.1400  144.0200      13.4        93       824        91
VIS    2025250    200200   21.1500  144.0100      13.4        93       832        91
VIS    2025250    200200   21.1400  143.9500      15.3       107       817        91
VIS    2025250    200200   21.1500  143.9000      12.5       110       813        97
VIS    2025250    200200   21.1300  143.7000      12.5       124       800        96
VIS    2025250    200200   21.1300  143.6800      12.1       124       800        97
VIS    2025250    200200   21.1500  143.6600      11.0       119       781        97
VIS    2025250    200200   21.1400  143.6300      10.8       114       777        96
VIS    2025250    200200   21.1400  143.6100      10.2       113       771        98
VIS    2025250    200200   21.1400  143.5800      12.5       103       762        93
VIS    2025250    200200   21.1500  143.2800      12.0        98       776        92
VIS    2025250    200200   21.1200  142.3800      13.1        88       926        98
VIS    2025250    200200   21.2100  152.1100       8.9        82       982        91
VIS    2025250    200200   21.2100  152.0900       7.0        80       982        94
VIS    2025250    200200   21.2100  152.0600       5.7        78       982        98
VIS    2025250    200200   21.2100  152.0400       5.6        77       944        99
VIS    2025250    200200   21.2200  152.0300       5.6        78       944        99
VIS    2025250    200200   21.2100  151.8900       5.5        86       979        96
VIS    2025250    200200   21.2100  151.8600       6.2        87       970        94
VIS    2025250    200200   21.2100  151.4900       5.2        82       980        91
VIS    2025250    200200   21.2000  151.4700       5.8        81       980        94
VIS    2025250    200200   21.2100  151.4500       5.7        86       980        93
VIS    2025250    200200   21.1900  151.4000       5.2        89       956        97
VIS    2025250    200200   21.1700  149.7800      10.0        84       947        92
VIS    2025250    200200   21.1700  149.7800       9.9        84       947        92
VIS    2025250    200200   21.1800  149.7400      10.0        82       935        91
VIS    2025250    200200   21.1900  149.7100      10.4        82       932        90
VIS    2025250    200200   21.1900  149.6900      10.2        81       928        91
VIS    2025250    200200   21.1800  149.6500      10.2        80       928        91
VIS    2025250    200200   21.1700  149.6500      10.2        79       927        91
VIS    2025250    200200   21.1700  149.6000       9.7        78       909        95
VIS    2025250    200200   21.1700  149.5900       9.5        79       909        95
VIS    2025250    200200   21.1800  149.5700       9.3        80       947        91
VIS    2025250    200200   21.1700  149.5400       9.7        78       956        90
VIS    2025250    200200   21.1900  149.5100       9.6        79       956        91
VIS    2025250    200200   21.1800  149.4800       9.7        76       922        94
VIS    2025250    200200   21.1800  149.4500       9.2        74       922        95
VIS    2025250    200200   21.1800  149.4500       9.0        75       922        96
VIS    2025250    200200   21.1900  149.4200       8.7        78       949        92
VIS    2025250    200200   21.1600  149.3900       8.9        77       917        95
VIS    2025250    200200   21.1700  149.3500       9.8        85       891        96
VIS    2025250    200200   21.1700  149.3400       9.9        86       891        96
VIS    2025250    200200   21.1800  149.3000       9.5        86       891        97
VIS    2025250    200200   21.1700  149.2900       9.7        85       891        97
VIS    2025250    200200   21.1700  149.2600       9.6        84       888        96
VIS    2025250    200200   21.1700  149.2200       9.2        86       858        97
VIS    2025250    200200   21.1800  149.2200       9.2        86       850        96
VIS    2025250    200200   21.1800  149.1900       9.0        83       858        96
VIS    2025250    200200   21.1800  149.1600       8.2        77       859        95
VIS    2025250    200200   21.1600  149.1300       8.5        83       864        98
VIS    2025250    200200   21.1700  149.0900       8.0        85       850        96
VIS    2025250    200200   21.1600  149.0900       8.0        85       850        97
VIS    2025250    200200   21.1700  149.0500       8.5        86       861        99
VIS    2025250    200200   21.1800  149.0300       8.4        84       872        98
VIS    2025250    200200   21.1800  149.0100       7.9        90       891        94
VIS    2025250    200200   21.1600  148.9400       8.7        91       878        96
VIS    2025250    200200   21.1800  148.8900       7.9        92       890        95
VIS    2025250    200200   21.1600  148.8800       9.2        78       890        97
VIS    2025250    200200   21.1700  148.8600       9.0        82       910        97
VIS    2025250    200200   21.1600  148.8200       9.1        84       898        96
VIS    2025250    200200   21.1600  148.7900       8.6        79       886        97
VIS    2025250    200200   21.1600  148.7900       8.4        78       886        97
VIS    2025250    200200   21.1700  148.7500       8.7        79       875        95
VIS    2025250    200200   21.1700  148.7400       8.6        81       874        99
VIS    2025250    200200   21.1500  148.6900       8.3        83       875        99
VIS    2025250    200200   21.1500  148.6800       8.4        84       876        99
VIS    2025250    200200   21.1700  148.6600       8.5        82       876        96
VIS    2025250    200200   21.1600  148.6100       8.1        77       881        99
VIS    2025250    200200   21.1500  148.5900       8.1        75       890        98
VIS    2025250    200200   21.1600  148.5800       8.5        74       890        98
VIS    2025250    200200   21.1700  148.5500       8.3        73       899        97
VIS    2025250    200200   21.1500  148.5100       7.9        77       905        98
VIS    2025250    200200   21.1700  148.4900       8.2        79       899        99
VIS    2025250    200200   21.1500  148.4600       8.1        76       902        96
VIS    2025250    200200   21.1600  148.4600       8.2        76       902        96
VIS    2025250    200200   21.1600  148.4100       8.6        76       983        90
VIS    2025250    200200   21.1500  148.3700       8.7        73       995        96
VIS    2025250    200200   21.1600  148.3300       7.1        76       963        91
VIS    2025250    200200   21.1600  148.2900       7.4        74       967        97
VIS    2025250    200200   21.1500  148.2700       7.7        74       950        97
VIS    2025250    200200   21.1700  148.2600       8.0        80       967        94
VIS    2025250    200200   21.1600  148.2200       8.9        82       987        95
VIS    2025250    200200   21.1600  148.1900       9.0        85       964        94
VIS    2025250    200200   21.1600  148.1600       8.6        87       934        95
VIS    2025250    200200   21.1500  148.1500       7.9        81       934        95
VIS    2025250    200200   21.1500  148.0800       7.1        97       913        91
VIS    2025250    200200   21.1500  148.0600       7.1        90       901        95
VIS    2025250    200200   21.1600  148.0400       7.2        79       891        96
VIS    2025250    200200   21.1600  148.0200       7.6        69       880        94
VIS    2025250    200200   21.1500  147.9800       9.6        84       868        93
VIS    2025250    200200   21.1700  147.9700       9.4        97       871        93
VIS    2025250    200200   21.1700  147.9400      10.7        91       871        96
VIS    2025250    200200   21.1600  147.9100       9.0        89       874       100
VIS    2025250    200200   21.1500  147.9000       8.8        86       874        99
VIS    2025250    200200   21.1600  147.8600       9.1        90       833        99
VIS    2025250    200200   21.1600  147.8300       9.2        86       842        97
VIS    2025250    200200   21.1500  147.8100      10.5        88       879        99
VIS    2025250    200200   21.1500  147.7900      11.0        95       877        98
VIS    2025250    200200   21.1500  147.7700      10.5       101       860        97
VIS    2025250    200200   21.1600  147.7500       9.8       100       849        95
VIS    2025250    200200   21.1600  147.7300       9.5       101       713        93
VIS    2025250    200200   21.1500  147.6800      10.9       108       702        91
VIS    2025250    200200   21.1600  147.6600      10.4       105       701        91
VIS    2025250    200200   21.1400  147.6500       9.9       101       702        92
VIS    2025250    200200   21.1400  147.6100      10.1       100       704        93
VIS    2025250    200200   21.1500  147.6000       9.7       100       707        95
VIS    2025250    200200   21.1600  147.5800       9.7        97       718        95
VIS    2025250    200200   21.1400  147.5400       9.5        93       751        97
VIS    2025250    200200   21.1400  147.5000       8.8        86       770        93
VIS    2025250    200200   21.1400  147.4900       8.7        84       774        90
VIS    2025250    200200   21.1500  147.4300       9.5        81       940        94
VIS    2025250    200200   21.1500  147.3800      10.8        86       981        95
VIS    2025250    200200   21.1600  147.3300      12.0        79       957        94
VIS    2025250    200200   21.1500  147.2300      13.6        87       961        97
VIS    2025250    200200   21.1500  147.2100      13.8        86       939        99
VIS    2025250    200200   21.1400  147.1800      13.9        85       946        97
VIS    2025250    200200   21.1400  147.1500      13.6        84       970        90
VIS    2025250    200200   21.1400  147.0600       9.6        91       880        98
VIS    2025250    200200   21.1400  147.0400       9.9        90       880        99
VIS    2025250    200200   21.1400  147.0100       9.7        93       820        97
VIS    2025250    200200   21.1400  146.9900       9.5        97       762        96
VIS    2025250    200200   21.1400  146.9200      10.3        94       749        93
VIS    2025250    200200   21.1400  146.9000      10.4        97       853        99
VIS    2025250    200200   21.1400  146.8500       9.4        89       963        92
VIS    2025250    200200   21.1500  146.8300      10.5        81       905        91
VIS    2025250    200200   21.1300  146.8000      14.0        74       877        92
VIS    2025250    200200   21.1300  146.8000      13.9        76       877        93
VIS    2025250    200200   21.1300  146.7600      14.2        83       882        94
VIS    2025250    200200   21.1400  146.7300      14.9        82       892        97
VIS    2025250    200200   21.1400  146.7100      15.0        80       892        96
VIS    2025250    200200   21.1500  146.6900      15.4        76       888        94
VIS    2025250    200200   21.1500  146.6700      15.7        76       888        93
VIS    2025250    200200   21.1400  146.6400      15.8        82       884        94
VIS    2025250    200200   21.1300  146.6000      15.0        82       884        94
VIS    2025250    200200   21.1300  146.5900      14.5        81       884        95
VIS    2025250    200200   21.1400  146.5500      14.8        80       882        95
VIS    2025250    200200   21.1300  146.5500      15.0        80       882        95
VIS    2025250    200200   21.1400  146.5200      14.8        79       881        95
VIS    2025250    200200   21.1500  146.4800      15.0        77       881        93
VIS    2025250    200200   21.1300  146.4700      15.6        77       879        92
VIS    2025250    200200   21.1300  146.4400      15.5        71       879        90
VIS    2025250    200200   21.1300  146.4000      15.0        74       879        92
VIS    2025250    200200   21.1400  146.3800      15.1        79       883        95
VIS    2025250    200200   21.1300  146.3500      14.8        83       879        96
VIS    2025250    200200   21.1500  146.3500      15.4        81       883        95
VIS    2025250    200200   21.1300  146.3000      15.6        86       871        94
VIS    2025250    200200   21.1400  146.2900      16.1        83       886        94
VIS    2025250    200200   21.1300  146.2600      15.4        79       864        91
VIS    2025250    200200   21.1200  144.0400      13.3        98       789        92
VIS    2025250    200200   21.1200  144.0400      13.0       102       787        95
VIS    2025250    200200   21.1100  143.7300      12.5       102       832        94
VIS    2025250    200200   21.1000  143.7000      12.5       120       778        96
VIS    2025250    200200   21.1000  143.6900      13.2       119       779        94
VIS    2025250    200200   21.1100  143.6500      12.8       117       798        95
VIS    2025250    200200   21.1000  143.6200      11.4       111       782        98
VIS    2025250    200200   21.1000  143.6200      11.1       108       782        98
VIS    2025250    200200   21.1100  143.5800      12.4        98       762        91
VIS    2025250    200200   21.1200  143.3700      12.3        93       763        90
VIS    2025250    200200   21.1900  152.0900       7.0        79       982        98
VIS    2025250    200200   21.1800  152.0600       5.9        81       967        99
VIS    2025250    200200   21.1900  152.0500       5.5        77       949       100
VIS    2025250    200200   21.1800  151.6100       6.3        74       983        93
VIS    2025250    200200   21.1900  151.4500       5.0        92       979        96
VIS    2025250    200200   21.1700  151.4200       5.2       104       962        91
VIS    2025250    200200   21.1600  151.1400       6.8        70       995        94
VIS    2025250    200200   21.1600  151.1200       6.3        70       991        96
VIS    2025250    200200   21.1700  151.0900       6.5        75       980        96
VIS    2025250    200200   21.1600  149.7700       9.9        84       936        95
VIS    2025250    200200   21.1600  149.7400       9.9        83       928        95
VIS    2025250    200200   21.1500  149.7100      10.5        84       921        91
VIS    2025250    200200   21.1500  149.6900       9.5        84       936        91
VIS    2025250    200200   21.1600  149.6400      10.4        78       910        92
VIS    2025250    200200   21.1600  149.6300      10.6        78       910        92
VIS    2025250    200200   21.1500  149.5900      10.8        80       909        91
VIS    2025250    200200   21.1500  149.5300      10.1        78       918        93
VIS    2025250    200200   21.1600  149.5300       9.8        78       918        94
VIS    2025250    200200   21.1600  149.4900      10.1        79       925        92
VIS    2025250    200200   21.1600  149.4800      10.2        77       922        92
VIS    2025250    200200   21.1500  149.4500      10.0        74       916        93
VIS    2025250    200200   21.1400  149.4300      10.1        75       916        93
VIS    2025250    200200   21.1400  149.4000       8.8        74       899        95
VIS    2025250    200200   21.1600  149.3800       9.2        79       904        96
VIS    2025250    200200   21.1500  149.3500       9.6        83       891        97
VIS    2025250    200200   21.1400  149.3100       9.7        83       893        96
VIS    2025250    200200   21.1500  149.2800       9.5        85       891        97
VIS    2025250    200200   21.1500  149.2700       9.4        85       891        97
VIS    2025250    200200   21.1400  149.2300       9.1        86       862        97
VIS    2025250    200200   21.1500  149.2200       9.1        86       862        97
VIS    2025250    200200   21.1400  149.1900       9.0        79       862        93
VIS    2025250    200200   21.1500  149.1700       8.9        77       860        94
VIS    2025250    200200   21.1600  149.1300       8.5        83       866        98
VIS    2025250    200200   21.1400  149.1200       8.3        82       866        98
VIS    2025250    200200   21.1500  149.1000       7.9        84       855        97
VIS    2025250    200200   21.1400  149.0500       8.3        90       861        99
VIS    2025250    200200   21.1400  149.0500       8.5        90       861        99
VIS    2025250    200200   21.1400  149.0200       7.8        90       861        97
VIS    2025250    200200   21.1400  148.9900       6.6        95       866        91
VIS    2025250    200200   21.1300  148.9600       7.4        93       872        98
VIS    2025250    200200   21.1500  148.9300       8.9        87       881        97
VIS    2025250    200200   21.1300  148.9100       9.5        88       888        95
VIS    2025250    200200   21.1500  148.8900       9.4        79       890        96
VIS    2025250    200200   21.1400  148.8600       9.5        77       899        96
VIS    2025250    200200   21.1400  148.8300       9.9        80       899        95
VIS    2025250    200200   21.1300  148.8000      10.0        79       886        94
VIS    2025250    200200   21.1500  148.7900       8.6        78       886        97
VIS    2025250    200200   21.1500  148.7500       8.6        78       876        96
VIS    2025250    200200   21.1500  148.7400       8.6        79       875        96
VIS    2025250    200200   21.1300  148.7000       8.3        82       881        99
VIS    2025250    200200   21.1500  148.6800       8.4        84       876        99
VIS    2025250    200200   21.1400  148.6700       8.5        83       877        96
VIS    2025250    200200   21.1500  148.6200       7.8        76       881        98
VIS    2025250    200200   21.1400  148.6000       7.9        75       891        97
VIS    2025250    200200   21.1400  148.5900       8.1        76       891        98
VIS    2025250    200200   21.1300  148.5500       9.1        77       911       100
VIS    2025250    200200   21.1300  148.5400       8.9        77       907       100
VIS    2025250    200200   21.1300  148.5100       8.3        77       900        98
VIS    2025250    200200   21.1300  148.4700       7.7        76       896        93
VIS    2025250    200200   21.1500  148.4600       8.1        77       902        96
VIS    2025250    200200   21.1300  148.4200       8.5        76       935        96
VIS    2025250    200200   21.1300  148.4100       8.7        74       963        98
VIS    2025250    200200   21.1300  148.3900       9.3        72       983        96
VIS    2025250    200200   21.1300  148.3400       7.9        70       949        90
VIS    2025250    200200   21.1200  148.2900       7.9        73       939        98
VIS    2025250    200200   21.1400  148.2700       7.6        74       950        97
VIS    2025250    200200   21.1400  148.2500       8.0        74       967        98
VIS    2025250    200200   21.1300  148.2300       8.3        76       987        93
VIS    2025250    200200   21.1300  148.2100       7.8        80       977        94
VIS    2025250    200200   21.1300  148.1700       7.8        80       926        96
VIS    2025250    200200   21.1200  148.1500       7.8        80       918        96
VIS    2025250    200200   21.1300  148.1400       7.8        85       934        93
VIS    2025250    200200   21.1200  148.1000       7.8        95       904        91
VIS    2025250    200200   21.1300  148.0700       7.1        87       891        95
VIS    2025250    200200   21.1300  148.0500       6.9        78       884        94
VIS    2025250    200200   21.1200  148.0200       7.6        73       869        92
VIS    2025250    200200   21.1300  147.9900       9.3        84       863        97
VIS    2025250    200200   21.1400  147.9900       9.5        82       864        94
VIS    2025250    200200   21.1300  147.9500      12.7        79       868        90
VIS    2025250    200200   21.1400  147.9400      12.1        81       868        94
VIS    2025250    200200   21.1400  147.9000       9.2        81       875        99
VIS    2025250    200200   21.1200  147.8700       9.6        82       879        99
VIS    2025250    200200   21.1400  147.8600       9.2        88       874        99
VIS    2025250    200200   21.1200  147.8100       9.1        91       890        99
VIS    2025250    200200   21.1200  147.8100       9.3        94       888        98
VIS    2025250    200200   21.1200  147.7700      10.6       103       842        97
VIS    2025250    200200   21.1400  147.7600      10.6       103       815        96
VIS    2025250    200200   21.1200  147.7200      10.1       101       712        94
VIS    2025250    200200   21.1200  147.7000      10.1        96       705        92
VIS    2025250    200200   21.1200  147.6800      10.5        96       704        90
VIS    2025250    200200   21.1400  147.6400      10.0       101       702        92
VIS    2025250    200200   21.1200  147.6100      10.9       103       704        91
VIS    2025250    200200   21.1200  147.6000      11.1       103       710        91
VIS    2025250    200200   21.1200  147.5600      10.6       100       732        95
VIS    2025250    200200   21.1400  147.5500       9.7        95       751        97
VIS    2025250    200200   21.1300  147.5200       9.1        90       762        95
VIS    2025250    200200   21.1400  147.5100       8.8        88       770        94
VIS    2025250    200200   21.1300  147.4500       8.2        80       902        90
VIS    2025250    200200   21.1100  147.4200      10.3        83       949        97
VIS    2025250    200200   21.1300  147.3900      12.7        80       956        99
VIS    2025250    200200   21.1200  147.2200      14.5        82       977        97
VIS    2025250    200200   21.1300  147.1900      14.5        83       948        99
VIS    2025250    200200   21.1300  147.1800      14.2        84       948        98
VIS    2025250    200200   21.1100  147.1500      14.4        83       964        97
VIS    2025250    200200   21.1100  147.1300      13.1        84       961        92
VIS    2025250    200200   21.1200  147.1000      10.4        88       915        94
VIS    2025250    200200   21.1100  147.0700       8.3        86       880        95
VIS    2025250    200200   21.1300  147.0400       9.2        89       820        95
VIS    2025250    200200   21.1300  147.0200       9.3        90       820        95
VIS    2025250    200200   21.1300  146.9900       9.7        97       751        96
VIS    2025250    200200   21.1200  146.9600      10.1       102       746        91
VIS    2025250    200200   21.1100  146.9100      11.5        86       903        91
VIS    2025250    200200   21.1200  146.8700      11.7        82       905        90
VIS    2025250    200200   21.1300  146.8500       9.4        88       905        96
VIS    2025250    200200   21.1300  146.8000      14.2        75       877        92
VIS    2025250    200200   21.1300  146.7600      14.4        83       882        94
VIS    2025250    200200   21.1200  146.7600      14.7        82       882        94
VIS    2025250    200200   21.1300  146.7300      15.0        82       892        96
VIS    2025250    200200   21.1200  146.6900      15.0        81       888        96
VIS    2025250    200200   21.1200  146.6800      14.8        82       888        96
VIS    2025250    200200   21.1100  146.6600      14.6        84       884        96
VIS    2025250    200200   21.1100  146.6300      15.5        83       888        96
VIS    2025250    200200   21.1100  146.6000      15.0        80       886        94
VIS    2025250    200200   21.1000  146.5700      15.1        77       886        94
VIS    2025250    200200   21.1100  146.5500      15.1        78       884        94
VIS    2025250    200200   21.1200  146.5300      15.0        80       882        95
VIS    2025250    200200   21.1100  146.5000      15.3        82       879        95
VIS    2025250    200200   21.1100  146.4800      15.2        81       879        94
VIS    2025250    200200   21.1000  146.4100      14.0        78       877        94
VIS    2025250    200200   21.1000  146.3900      14.1        81       877        94
VIS    2025250    200200   21.1200  146.3700      14.7        81       877        94
VIS    2025250    200200   21.1200  146.3000      15.8        86       864        92
VIS    2025250    200200   21.1200  146.2700      15.2        82       864        92
VIS    2025250    200200   21.0800  144.0300      12.7       110       760        90
VIS    2025250    200200   21.0900  143.7500      13.2        98       839        94
VIS    2025250    200200   21.1000  143.7100      12.4       120       739        97
VIS    2025250    200200   21.1000  143.6800      13.4       118       780        93
VIS    2025250    200200   21.1000  143.6700      13.3       118       784        93
VIS    2025250    200200   21.1000  143.6400      12.7       116       798        93
VIS    2025250    200200   21.1000  143.6300      11.8       115       791        98
VIS    2025250    200200   21.0800  143.4900      10.9        93       777        91
VIS    2025250    200200   21.1700  152.0800       6.9        83       982        93
VIS    2025250    200200   21.1700  152.0400       5.7        79       949        99
VIS    2025250    200200   21.1700  152.0200       5.5        77       924        96
VIS    2025250    200200   21.1700  151.4600       5.1        89       970        93
VIS    2025250    200200   21.1400  151.2500       6.3        90       994        96
VIS    2025250    200200   21.1500  151.2200       6.1        91       994        94
VIS    2025250    200200   21.1400  151.1200       6.2        73       991        96
VIS    2025250    200200   21.1300  149.8100       9.8        77       955        90
VIS    2025250    200200   21.1300  149.7900       9.6        78       933        95
VIS    2025250    200200   21.1200  149.7600       9.8        83       922        96
VIS    2025250    200200   21.1300  149.7500       9.3        84       917        92
VIS    2025250    200200   21.1300  149.7000      10.4        82       915        92
VIS    2025250    200200   21.1200  149.6900      10.4        82       915        91
VIS    2025250    200200   21.1300  149.6700       9.5        82       943        91
VIS    2025250    200200   21.1300  149.5300      10.5        80       915        92
VIS    2025250    200200   21.1300  149.5200      10.4        79       915        92
VIS    2025250    200200   21.1300  149.4800      10.7        78       913        91
VIS    2025250    200200   21.1300  149.4600      10.9        78       908        91
VIS    2025250    200200   21.1200  149.4300      10.5        75       908        92
VIS    2025250    200200   21.1300  149.4100       9.2        72       914        95
VIS    2025250    200200   21.1100  149.3800       8.7        74       904        96
VIS    2025250    200200   21.1200  149.3500       9.0        81       902        97
VIS    2025250    200200   21.1300  149.3300       9.7        82       893        97
VIS    2025250    200200   21.1300  149.2900       9.6        81       902        96
VIS    2025250    200200   21.1300  149.2800       9.5        82       906        95
VIS    2025250    200200   21.1100  149.2400       8.9        78       910        98
VIS    2025250    200200   21.1100  149.2400       8.9        79       902        97
VIS    2025250    200200   21.1300  149.2000       9.0        79       864        93
VIS    2025250    200200   21.1300  149.1900       9.0        77       864        93
VIS    2025250    200200   21.1100  149.1500       8.8        80       866        97
VIS    2025250    200200   21.1100  149.1200       8.2        83       862        98
VIS    2025250    200200   21.1200  149.1000       7.7        83       858        98
VIS    2025250    200200   21.1100  149.0700       8.1        87       855        99
VIS    2025250    200200   21.1100  149.0400       8.0        89       857        98
VIS    2025250    200200   21.1100  149.0300       7.8        89       857        98
VIS    2025250    200200   21.1200  149.0000       7.4        88       865        98
VIS    2025250    200200   21.1100  148.9700       7.5        90       869        98
VIS    2025250    200200   21.1100  148.9500       7.9        93       878        97
VIS    2025250    200200   21.1300  148.9100       9.5        88       888        95
VIS    2025250    200200   21.1200  148.9100       9.5        86       888        96
VIS    2025250    200200   21.1200  148.8600       9.5        75       903        96
VIS    2025250    200200   21.1300  148.8400      10.0        78       902        94
VIS    2025250    200200   21.1200  148.8300      10.2        79       904        94
VIS    2025250    200200   21.1100  148.8000      10.9        79       902        90
VIS    2025250    200200   21.1200  148.7800      10.4        75       886        92
VIS    2025250    200200   21.1200  148.7500       9.8        75       881        93
VIS    2025250    200200   21.1100  148.7100       8.8        78       884        99
VIS    2025250    200200   21.1200  148.7000       8.4        82       882        99
VIS    2025250    200200   21.1000  148.6600       8.5        78       884        96
VIS    2025250    200200   21.1100  148.6500       8.4        77       884        96
VIS    2025250    200200   21.1200  148.6200       7.6        71       885        96
VIS    2025250    200200   21.1000  148.6000       7.8        67       899        93
VIS    2025250    200200   21.1200  148.5800       9.3        74       916        99
VIS    2025250    200200   21.1200  148.5400       9.7        76       911       100
VIS    2025250    200200   21.1000  148.5100       8.4        75       902        98
VIS    2025250    200200   21.1100  148.4900       7.8        77       900        95
VIS    2025250    200200   21.1200  148.4800       7.7        77       896        94
VIS    2025250    200200   21.1000  148.4500       8.3        79       914        98
VIS    2025250    200200   21.1200  148.4100       8.8        74       959        99
VIS    2025250    200200   21.1100  148.3800       9.2        69       978        97
VIS    2025250    200200   21.1100  148.3800       9.0        70       974        98
VIS    2025250    200200   21.1000  148.3400       7.9        71       937        98
VIS    2025250    200200   21.1000  148.2800       8.9        76       958        98
VIS    2025250    200200   21.1000  148.2800       8.7        76       961        99
VIS    2025250    200200   21.1100  148.2300       8.4        78       982        93
VIS    2025250    200200   21.1000  148.2200       8.5        77       982        94
VIS    2025250    200200   21.1000  148.1900       7.4        75       918        94
VIS    2025250    200200   21.1100  148.1600       8.1        80       904        97
VIS    2025250    200200   21.1200  148.1500       7.9        80       918        96
VIS    2025250    200200   21.1100  148.1100       7.6        95       904        93
VIS    2025250    200200   21.1000  148.0900       7.9        94       884        97
VIS    2025250    200200   21.1000  148.0700       7.5        90       884        96
VIS    2025250    200200   21.1000  148.0300       7.5        73       872        92
VIS    2025250    200200   21.1100  148.0200       7.5        73       868        92
VIS    2025250    200200   21.1200  147.9900       9.3        87       863        97
VIS    2025250    200200   21.1100  147.9000      10.4        77       877        97
VIS    2025250    200200   21.1100  147.8800      10.6        78       877        97
VIS    2025250    200200   21.1100  147.8700      10.6        78       879        97
VIS    2025250    200200   21.1100  147.8400       8.9        83       890        99
VIS    2025250    200200   21.1100  147.8100       9.0        92       890        99
VIS    2025250    200200   21.0900  147.8000      10.0        99       869        98
VIS    2025250    200200   21.1000  147.7700      10.8       105       805        97
VIS    2025250    200200   21.0900  147.7500      11.0       100       754        95
VIS    2025250    200200   21.1000  147.7000      10.1        90       712        91
VIS    2025250    200200   21.1100  147.6100      11.1       102       704        90
VIS    2025250    200200   21.1100  147.5800      10.9       102       727        94
VIS    2025250    200200   21.1100  147.5600      10.6       100       729        95
VIS    2025250    200200   21.1000  147.5400       9.5        95       745        94
VIS    2025250    200200   21.1000  147.5200       9.2        89       776        90
VIS    2025250    200200   21.0900  147.4500       9.8        87       976        94
VIS    2025250    200200   21.1000  147.4300      10.0        85       946        96
VIS    2025250    200200   21.1000  147.4200      10.4        85       946        97
VIS    2025250    200200   21.0900  147.3900      10.9        90       934        94
VIS    2025250    200200   21.0900  147.2500      14.2        79       993        91
VIS    2025250    200200   21.1000  147.2400      14.9        82       984        97
VIS    2025250    200200   21.1000  147.2000      15.0        81       964        97
VIS    2025250    200200   21.0900  147.1700      14.7        80       964        99
VIS    2025250    200200   21.0900  147.1700      14.4        80       948        99
VIS    2025250    200200   21.0900  147.1400      14.0        81       939        96
VIS    2025250    200200   21.0800  147.1100      11.4        81       915        98
VIS    2025250    200200   21.0800  147.0900       9.5        79       851        94
VIS    2025250    200200   21.1000  147.0600       7.9        83       811        90
VIS    2025250    200200   21.1000  147.0400       8.6        87       753        90
VIS    2025250    200200   21.0900  147.0200       9.2        89       743        92
VIS    2025250    200200   21.0900  146.9900      10.1        90       743        90
VIS    2025250    200200   21.0900  146.9500      11.5        87       769        91
VIS    2025250    200200   21.0800  146.9400      12.3        83       866        96
VIS    2025250    200200   21.0800  146.9000      13.5        82       894        97
VIS    2025250    200200   21.0900  146.8900      13.4        83       903        97
VIS    2025250    200200   21.0800  146.8500      14.3        80       885        90
VIS    2025250    200200   21.0800  146.8100      14.4        79       883        93
VIS    2025250    200200   21.0900  146.7900      14.5        77       882        93
VIS    2025250    200200   21.0900  146.7700      14.3        76       885        94
VIS    2025250    200200   21.0800  146.7400      13.5        76       892        95
VIS    2025250    200200   21.1000  146.7200      15.2        79       894        96
VIS    2025250    200200   21.0800  146.6900      15.2        77       890        95
VIS    2025250    200200   21.0800  146.6500      14.2        82       890        96
VIS    2025250    200200   21.0800  146.6400      13.9        82       890        97
VIS    2025250    200200   21.1000  146.6200      14.7        84       890        97
VIS    2025250    200200   21.0900  146.5900      15.0        79       888        95
VIS    2025250    200200   21.0900  146.5600      15.3        76       886        94
VIS    2025250    200200   21.1000  146.5300      15.3        80       884        95
VIS    2025250    200200   21.1000  146.5200      15.3        82       883        95
VIS    2025250    200200   21.0800  146.4800      14.6        84       883        97
VIS    2025250    200200   21.0800  146.4600      15.1        80       879        94
VIS    2025250    200200   21.0900  146.4200      14.5        79       877        94
VIS    2025250    200200   21.0900  146.4000      13.4        83       860        94
VIS    2025250    200200   21.1000  146.4000      13.6        83       860        94
VIS    2025250    200200   21.1500  152.0400       5.8        81       954        94
VIS    2025250    200200   21.1300  151.8400       6.3        86       993        98
VIS    2025250    200200   21.1300  151.2700       6.7        76       989        97
VIS    2025250    200200   21.1200  151.2500       6.5        86       983        92
VIS    2025250    200200   21.1200  151.2300       6.4        87       983        92
VIS    2025250    200200   21.1200  151.1600       5.8        88       977        93
VIS    2025250    200200   21.1100  151.1400       6.4        82       968        95
VIS    2025250    200200   21.1100  151.1100       6.3        76       962        98
VIS    2025250    200200   21.1100  149.8100       9.9        77       955        90
VIS    2025250    200200   21.0900  149.7600      11.1        83       930        92
VIS    2025250    200200   21.1100  149.4800      10.7        78       906        92
VIS    2025250    200200   21.1100  149.4600      10.9        79       906        92
VIS    2025250    200200   21.0900  149.4400      10.9        79       906        91
VIS    2025250    200200   21.1000  149.4000       9.5        73       912        95
VIS    2025250    200200   21.1000  149.4000       9.3        72       912        95
VIS    2025250    200200   21.1100  149.3700       8.6        76       904        97
VIS    2025250    200200   21.1000  149.3400       9.0        79       904        98
VIS    2025250    200200   21.1100  149.3000       9.9        80       912        94
VIS    2025250    200200   21.1000  149.3000       9.9        79       912        93
VIS    2025250    200200   21.1100  149.2600       9.5        77       941        93
VIS    2025250    200200   21.1100  149.2400       8.9        78       910        97
VIS    2025250    200200   21.1100  149.2200       8.7        79       888        95
VIS    2025250    200200   21.1000  149.1800       9.1        78       873        96
VIS    2025250    200200   21.1000  149.1600       9.0        80       873        97
VIS    2025250    200200   21.0800  149.1300       8.6        86       863        98
VIS    2025250    200200   21.0900  149.1000       8.4        85       860        97
VIS    2025250    200200   21.0800  149.0900       8.8        85       860        97
VIS    2025250    200200   21.1000  149.0500       8.1        87       855        98
VIS    2025250    200200   21.1000  149.0400       7.9        89       857        98
VIS    2025250    200200   21.0900  149.0000       7.6        90       867        99
VIS    2025250    200200   21.0900  148.9800       7.8        90       868        99
VIS    2025250    200200   21.1000  148.9700       7.6        90       869        98
VIS    2025250    200200   21.1000  148.9400       8.4        96       880        95
VIS    2025250    200200   21.1000  148.9000       8.8        79       890        98
VIS    2025250    200200   21.1000  148.8700       8.8        74       904        98
VIS    2025250    200200   21.1000  148.8700       8.9        74       904        98
VIS    2025250    200200   21.1000  148.8300      10.0        82       941        93
VIS    2025250    200200   21.1000  148.7700      11.1        76       901        90
VIS    2025250    200200   21.0900  148.7500      10.8        75       893        91
VIS    2025250    200200   21.0800  148.7300      10.3        77       893        93
VIS    2025250    200200   21.1000  148.7100       9.1        78       887        99
VIS    2025250    200200   21.0900  148.6700       8.6        80       884        98
VIS    2025250    200200   21.1000  148.6500       8.3        77       884        96
VIS    2025250    200200   21.0900  148.6300       7.6        74       895        96
VIS    2025250    200200   21.1000  148.6000       7.9        66       915        95
VIS    2025250    200200   21.0800  148.5700       9.6        69       946        99
VIS    2025250    200200   21.0800  148.5600       9.6        70       933        99
VIS    2025250    200200   21.0900  148.5200       8.7        73       904        98
VIS    2025250    200200   21.0900  148.5100       8.3        74       904        98
VIS    2025250    200200   21.0900  148.4900       7.8        77       904        95
VIS    2025250    200200   21.0800  148.4600       8.2        78       900        98
VIS    2025250    200200   21.0800  148.4100       8.6        74       903        98
VIS    2025250    200200   21.0800  148.4100       8.6        74       914        98
VIS    2025250    200200   21.0900  148.3900       8.8        75       952        96
VIS    2025250    200200   21.0900  148.3600       8.2        71       949        98
VIS    2025250    200200   21.0800  148.2600       9.8        78       997        98
VIS    2025250    200200   21.0800  148.2600       9.7        78       997        99
VIS    2025250    200200   21.0900  148.2300       8.8        79       982        95
VIS    2025250    200200   21.0900  148.1900       7.4        75       919        94
VIS    2025250    200200   21.0700  148.1600       8.1        79       894        96
VIS    2025250    200200   21.0700  148.1500       8.2        79       894        97
VIS    2025250    200200   21.0800  148.1300       7.9        84       885        98
VIS    2025250    200200   21.0700  148.0900       7.8        91       883        97
VIS    2025250    200200   21.0700  148.0700       7.6        89       883        97
VIS    2025250    200200   21.0800  148.0600       7.4        85       877        96
VIS    2025250    200200   21.0800  148.0300       7.4        77       871        93
VIS    2025250    200200   21.0900  148.0000       9.5        84       863        92
VIS    2025250    200200   21.0700  147.9400      11.3        87       870        97
VIS    2025250    200200   21.0700  147.9300      11.3        86       871        97
VIS    2025250    200200   21.0900  147.8900      10.9        73       876        94
VIS    2025250    200200   21.0800  147.8600      11.1        74       880        94
VIS    2025250    200200   21.0800  147.8600      11.0        75       880        95
VIS    2025250    200200   21.0700  147.8100      10.1        92       884        99
VIS    2025250    200200   21.0900  147.8000       9.9        97       874        99
VIS    2025250    200200   21.0900  147.7800      11.0       104       842        96
VIS    2025250    200200   21.0900  147.7500      11.0       100       754        96
VIS    2025250    200200   21.0900  147.7200      10.4        91       742        92
VIS    2025250    200200   21.0800  147.7100      10.6        88       742        90
VIS    2025250    200200   21.0700  147.6700      10.6        96       735        93
VIS    2025250    200200   21.0700  147.5900       8.3        85       702        92
VIS    2025250    200200   21.0700  147.5600       8.8        91       720        95
VIS    2025250    200200   21.0600  147.5400       9.2        88       751        94
VIS    2025250    200200   21.0800  147.5300       9.2        89       764        92
VIS    2025250    200200   21.0800  147.4500      10.7        88       976        93
VIS    2025250    200200   21.0700  147.4100      11.4        90       934        95
VIS    2025250    200200   21.0800  147.4000      11.0        91       934        94
VIS    2025250    200200   21.0700  147.2100      11.6        80       963        92
VIS    2025250    200200   21.0800  147.1900      13.8        81       964        97
VIS    2025250    200200   21.0800  147.1600      13.8        79       936        98
VIS    2025250    200200   21.0800  147.1500      13.2        78       936        96
VIS    2025250    200200   21.0600  147.1300      11.8        78       894        95
VIS    2025250    200200   21.0800  147.1000      10.0        80       877        96
VIS    2025250    200200   21.0600  146.9300      13.5        79       889        91
VIS    2025250    200200   21.0700  146.9300      12.9        81       891        95
VIS    2025250    200200   21.0800  146.9000      13.6        80       894        96
VIS    2025250    200200   21.0600  146.8800      14.8        83       883        94
VIS    2025250    200200   21.0700  146.8300      13.9        80       885        93
VIS    2025250    200200   21.0700  146.8300      13.8        79       883        92
VIS    2025250    200200   21.0600  146.8000      14.1        75       883        91
VIS    2025250    200200   21.0700  146.7600      13.8        76       887        95
VIS    2025250    200200   21.0700  146.7400      13.4        76       892        97
VIS    2025250    200200   21.0700  146.7200      14.0        76       893        97
VIS    2025250    200200   21.0500  146.6800      14.7        78       896        97
VIS    2025250    200200   21.0700  146.6800      15.2        78       890        95
VIS    2025250    200200   21.0600  146.6400      13.5        82       896        98
VIS    2025250    200200   21.0500  146.6200      13.6        79       894        98
VIS    2025250    200200   21.0500  146.5900      14.5        77       894        97
VIS    2025250    200200   21.0600  146.5800      14.9        78       892        96
VIS    2025250    200200   21.0500  146.5400      15.0        74       890        94
VIS    2025250    200200   21.0500  146.5200      15.4        74       886        93
VIS    2025250    200200   21.0600  146.5000      14.7        79       884        96
VIS    2025250    200200   21.0600  146.4700      14.6        79       884        95
VIS    2025250    200200   21.0600  146.4300      14.2        81       858        90
VIS    2025250    200200   21.0600  146.2400      15.4        77       934        98
VIS    2025250    200200   21.0600  146.2100      14.5        78       903        98
VIS    2025250    200200   21.0200  142.3700      11.0        98       818        90
VIS    2025250    200200   21.1000  151.8300       6.5        88       989        97
VIS    2025250    200200   21.1000  151.8100       6.3        86       989        98
VIS    2025250    200200   21.1000  151.8000       6.3        85       989        99
VIS    2025250    200200   21.1000  151.5200       7.4        87       977        90
VIS    2025250    200200   21.0900  151.5000       7.6        90       974        92
VIS    2025250    200200   21.0900  151.4600       7.3        94       961        90
VIS    2025250    200200   21.0900  151.4500       7.0        95       961        90
VIS    2025250    200200   21.1000  151.4100       6.2        94       938        95
VIS    2025250    200200   21.0900  151.2800       4.7        84       960        90
VIS    2025250    200200   21.1000  151.2600       6.1        87       960        93
VIS    2025250    200200   21.1100  151.2400       6.4        87       976        94
VIS    2025250    200200   21.0900  151.2000       5.8        89       975        90
VIS    2025250    200200   21.0900  151.1500       5.7        86       948        98
VIS    2025250    200200   21.0900  151.1300       6.2        80       944        99
VIS    2025250    200200   21.0700  149.6100      10.7        79       922        91
VIS    2025250    200200   21.0700  149.5900      10.7        80       919        91
VIS    2025250    200200   21.0700  149.5800      10.7        81       915        91
VIS    2025250    200200   21.0600  149.5200      11.0        80       903        90
VIS    2025250    200200   21.0800  149.5000      11.3        80       901        91
VIS    2025250    200200   21.0800  149.4800      11.2        81       903        91
VIS    2025250    200200   21.0800  149.4300      10.8        78       906        91
VIS    2025250    200200   21.0800  149.4300      10.7        77       908        92
VIS    2025250    200200   21.0800  149.3800       9.0        75       933        95
VIS    2025250    200200   21.0700  149.3700       9.0        76       933        95
VIS    2025250    200200   21.0600  149.3300       9.1        78       916        97
VIS    2025250    200200   21.0700  149.3100       9.1        80       912        97
VIS    2025250    200200   21.0800  149.2900       9.8        78       913        94
VIS    2025250    200200   21.0700  149.2700       9.5        77       924        94
VIS    2025250    200200   21.0800  149.2400       9.0        75       927        99
VIS    2025250    200200   21.0600  149.2200       8.7        77       905        99
VIS    2025250    200200   21.0600  149.1800       8.5        78       878        97
VIS    2025250    200200   21.0800  149.1500       8.7        82       868        98
VIS    2025250    200200   21.0800  149.1300       8.5        86       862        98
VIS    2025250    200200   21.0600  149.1200       8.6        86       864        98
VIS    2025250    200200   21.0700  149.0900       9.0        85       860        96
VIS    2025250    200200   21.0800  149.0700       8.7        86       856        98
VIS    2025250    200200   21.0700  149.0400       8.3        89       856        99
VIS    2025250    200200   21.0600  149.0000       8.3        95       862        99
VIS    2025250    200200   21.0600  148.9900       8.3        95       869        98
VIS    2025250    200200   21.0700  148.9500       8.2        88       876        97
VIS    2025250    200200   21.0700  148.9400       8.5        87       878        95
VIS    2025250    200200   21.0600  148.8300       8.5        81       970        99
VIS    2025250    200200   21.0800  148.8000      11.0        81       944        91
VIS    2025250    200200   21.0700  148.7700      11.0        77       917        92
VIS    2025250    200200   21.0600  148.7500      10.5        78       906        99
VIS    2025250    200200   21.0700  148.7300      10.1        78       895        98
VIS    2025250    200200   21.0700  148.7000       9.3        79       888        99
VIS    2025250    200200   21.0700  148.6700       8.6        80       887       100
VIS    2025250    200200   21.0500  148.6500       8.2        79       895        98
VIS    2025250    200200   21.0700  148.6200       7.7        72       914        94
VIS    2025250    200200   21.0600  148.5700       9.0        72       958        99
VIS    2025250    200200   21.0700  148.5600       9.3        72       947       100
VIS    2025250    200200   21.0700  148.5200       8.7        75       907        99
VIS    2025250    200200   21.0700  148.5100       8.4        75       907        97
VIS    2025250    200200   21.0500  148.4800       7.7        73       900        97
VIS    2025250    200200   21.0500  148.4400       8.1        74       879        98
VIS    2025250    200200   21.0500  148.4400       8.3        75       879        98
VIS    2025250    200200   21.0700  148.4100       8.6        75       903        98
VIS    2025250    200200   21.0600  148.3900       8.7        79       907        98
VIS    2025250    200200   21.0500  148.3200       7.9        78       909        98
VIS    2025250    200200   21.0500  148.2800       8.8        78       968        98
VIS    2025250    200200   21.0500  148.2400       9.2        81       963        95
VIS    2025250    200200   21.0600  148.2400       9.1        81       963        95
VIS    2025250    200200   21.0500  148.2100       8.1        74       913        95
VIS    2025250    200200   21.0500  148.1700       7.8        83       894        96
VIS    2025250    200200   21.0600  148.1600       7.9        81       894        96
VIS    2025250    200200   21.0700  148.1300       7.9        81       889        97
VIS    2025250    200200   21.0700  148.0900       7.8        92       883        97
VIS    2025250    200200   21.0700  148.0800       7.6        90       883        97
VIS    2025250    200200   21.0500  148.0400       7.9        83       860        90
VIS    2025250    200200   21.0500  147.9400      11.0        84       870        95
VIS    2025250    200200   21.0600  147.9300      11.3        86       870        97
VIS    2025250    200200   21.0600  147.9100      11.0        80       873        96
VIS    2025250    200200   21.0500  147.8600      10.6        87       873        99
VIS    2025250    200200   21.0600  147.8600      10.8        86       876        98
VIS    2025250    200200   21.0600  147.8200      10.2        91       884        99
VIS    2025250    200200   21.0400  147.8000      10.6       100       853        98
VIS    2025250    200200   21.0500  147.7800      11.0       101       837        97
VIS    2025250    200200   21.0400  147.7500      10.8        97       800        98
VIS    2025250    200200   21.0600  147.7300      10.6        94       776        93
VIS    2025250    200200   21.0500  147.7100      10.3        92       792        95
VIS    2025250    200200   21.0400  147.6700      10.3       103       735        94
VIS    2025250    200200   21.0500  147.5900       7.7        78       707        90
VIS    2025250    200200   21.0500  147.5600       8.3        83       733        92
VIS    2025250    200200   21.0400  147.5400       9.6        82       814        94
VIS    2025250    200200   21.0400  147.5200      10.2        80       869        97
VIS    2025250    200200   21.0400  147.5000      10.5        79       937        94
VIS    2025250    200200   21.0400  147.4800       9.8        81       943        94
VIS    2025250    200200   21.0500  147.4500      10.8        84       916        99
VIS    2025250    200200   21.0400  147.4200      12.1        87       875        99
VIS    2025250    200200   21.0400  147.4100      11.7        90       875        99
VIS    2025250    200200   21.0500  147.2300      12.1        81       963        95
VIS    2025250    200200   21.0600  147.1800      11.2        82       940        94
VIS    2025250    200200   21.0400  147.1500      10.4        84       894        98
VIS    2025250    200200   21.0500  147.1300      11.1        79       894        94
VIS    2025250    200200   21.0300  147.1000       9.9        91       775        95
VIS    2025250    200200   21.0500  147.0100      10.7        85       738        91
VIS    2025250    200200   21.0500  147.0100      10.7        84       746        90
VIS    2025250    200200   21.0400  146.9300      14.7        75       878        91
VIS    2025250    200200   21.0500  146.9200      14.1        78       883        91
VIS    2025250    200200   21.0400  146.8900      14.9        80       880        92
VIS    2025250    200200   21.0500  146.8800      14.7        84       882        94
VIS    2025250    200200   21.0500  146.8400      14.2        80       885        94
VIS    2025250    200200   21.0500  146.8200      13.7        76       884        91
VIS    2025250    200200   21.0500  146.7900      14.1        75       885        93
VIS    2025250    200200   21.0500  146.7800      14.1        75       885        94
VIS    2025250    200200   21.0300  146.7500      13.9        81       885        96
VIS    2025250    200200   21.0500  146.7200      13.7        77       894        97
VIS    2025250    200200   21.0300  146.6900      14.1        81       898        98
VIS    2025250    200200   21.0500  146.6800      14.6        78       898        97
VIS    2025250    200200   21.0400  146.6400      12.7        75       896        97
VIS    2025250    200200   21.0400  146.6100      13.7        76       894        97
VIS    2025250    200200   21.0300  146.5900      14.3        75       896        96
VIS    2025250    200200   21.0500  146.5800      14.8        76       894        96
VIS    2025250    200200   21.0300  146.5300      14.9        70       896        94
VIS    2025250    200200   21.0400  146.5200      15.7        71       892        92
VIS    2025250    200200   21.0500  146.4900      14.6        78       886        96
VIS    2025250    200200   21.0300  146.4600      14.3        80       860        93
VIS    2025250    200200   21.0400  146.4500      14.9        79       860        91
VIS    2025250    200200   21.0500  146.4300      14.9        80       858        90
VIS    2025250    200200   21.0400  146.3000      16.1        73       886        91
VIS    2025250    200200   21.0300  146.2600      15.0        74       907        95
VIS    2025250    200200   21.0300  146.2400      15.1        76       904        94
VIS    2025250    200200   21.0300  146.0500      13.0        88       760        92
VIS    2025250    200200   21.0200  146.0100      12.2        96       751        92
VIS    2025250    200200   21.0800  151.8400       6.7        89       989        94
VIS    2025250    200200   21.0900  151.8100       6.2        86       989        99
VIS    2025250    200200   21.0900  151.8100       6.1        86       989        99
VIS    2025250    200200   21.0800  151.5100       7.6        88       971        93
VIS    2025250    200200   21.0700  151.4900       7.8        92       971        91
VIS    2025250    200200   21.0700  151.4200       6.9        92       935        93
VIS    2025250    200200   21.0800  151.4200       6.5        91       943        95
VIS    2025250    200200   21.0600  151.2200       6.5        87       937        97
VIS    2025250    200200   21.0600  151.2000       6.3        84       942        99
VIS    2025250    200200   21.0700  151.1600       5.8        85       936        94
VIS    2025250    200200   21.0700  151.1000       5.9        79       971        93
VIS    2025250    200200   21.0600  149.6200      10.7        80       920        91
VIS    2025250    200200   21.0600  149.6000      10.7        79       919        90
VIS    2025250    200200   21.0600  149.5800      10.4        80       915        93
VIS    2025250    200200   21.0400  149.5600      10.4        82       915        92
VIS    2025250    200200   21.0500  149.5100      10.6        80       903        92
VIS    2025250    200200   21.0600  149.5100      10.7        80       903        92
VIS    2025250    200200   21.0600  149.4700      11.4        80       900        90
VIS    2025250    200200   21.0400  149.4100      11.3        80       907        90
VIS    2025250    200200   21.0600  149.4000      10.2        78       926        92
VIS    2025250    200200   21.0500  149.3800       9.7        78       933        93
VIS    2025250    200200   21.0500  149.3600       9.2        78       933        95
VIS    2025250    200200   21.0400  149.3300       9.0        78       910        97
VIS    2025250    200200   21.0400  149.2900       8.9        78       911        97
VIS    2025250    200200   21.0400  149.2600       9.1        78       912        97
VIS    2025250    200200   21.0600  149.2400       8.9        76       918        99
VIS    2025250    200200   21.0400  149.2200       8.5        77       915        99
VIS    2025250    200200   21.0400  149.2000       8.3        80       905        99
VIS    2025250    200200   21.0600  149.1800       8.5        78       878        97
VIS    2025250    200200   21.0300  149.1400       8.5        79       866        97
VIS    2025250    200200   21.0500  149.1200       8.6        86       864        98
VIS    2025250    200200   21.0300  149.0900       8.9        87       856        97
VIS    2025250    200200   21.0400  149.0700       9.1        88       856        97
VIS    2025250    200200   21.0400  149.0500       8.8        90       856        98
VIS    2025250    200200   21.0500  149.0200       8.5        94       857        99
VIS    2025250    200200   21.0400  149.0000       8.6        95       859        99
VIS    2025250    200200   21.0500  148.9700       8.2        90       870        98
VIS    2025250    200200   21.0500  148.9300       8.0        80       878        98
VIS    2025250    200200   21.0500  148.8600       7.4        72       957        97
VIS    2025250    200200   21.0500  148.8300       8.3        80       970        99
VIS    2025250    200200   21.0300  148.8100       8.9        72       968       100
VIS    2025250    200200   21.0400  148.8000      10.1        74       972        98
VIS    2025250    200200   21.0500  148.7800      10.6        77       927        94
VIS    2025250    200200   21.0300  148.7400       9.5        75       912       100
VIS    2025250    200200   21.0300  148.7200       8.7        78       899        97
VIS    2025250    200200   21.0300  148.6800       8.1        77       893        99
VIS    2025250    200200   21.0500  148.6500       8.3        78       893        98
VIS    2025250    200200   21.0500  148.6100       8.0        73       956        95
VIS    2025250    200200   21.0400  148.5900       8.3        74       958        98
VIS    2025250    200200   21.0400  148.5600       8.8        75       958        98
VIS    2025250    200200   21.0400  148.5400       8.6        75       920        98
VIS    2025250    200200   21.0500  148.5200       8.7        75       907        99
VIS    2025250    200200   21.0300  148.4800       7.8        75       891        98
VIS    2025250    200200   21.0300  148.4500       7.9        74       877        98
VIS    2025250    200200   21.0400  148.4400       8.2        74       877        98
VIS    2025250    200200   21.0400  148.4100       8.6        77       879        99
VIS    2025250    200200   21.0400  148.4000       8.9        78       888        99
VIS    2025250    200200   21.0300  148.3700       8.8        75       892        99
VIS    2025250    200200   21.0300  148.3200       8.5        77       902        99
VIS    2025250    200200   21.0300  148.3200       8.4        78       902        98
VIS    2025250    200200   21.0200  148.2800       8.9        75       938        98
VIS    2025250    200200   21.0300  148.2500       9.3        79       938        98
VIS    2025250    200200   21.0300  148.2400       9.2        79       933        97
VIS    2025250    200200   21.0400  148.2100       8.2        75       913        94
VIS    2025250    200200   21.0400  148.1800       8.1        82       897        97
VIS    2025250    200200   21.0400  148.1700       8.0        84       894        96
VIS    2025250    200200   21.0200  148.1200       7.1        77       885        95
VIS    2025250    200200   21.0300  148.1000       7.6        89       874        96
VIS    2025250    200200   21.0300  148.0900       7.7        91       874        96
VIS    2025250    200200   21.0300  148.0500       8.3        88       860        92
VIS    2025250    200200   21.0400  148.0400       8.2        86       860        91
VIS    2025250    200200   21.0400  148.0000       9.2        87       847        94
VIS    2025250    200200   21.0400  147.9700      10.5        85       863        92
VIS    2025250    200200   21.0300  147.9600      10.9        78       869        91
VIS    2025250    200200   21.0300  147.9400      10.8        74       869        91
VIS    2025250    200200   21.0200  147.9000      10.0        75       871        96
VIS    2025250    200200   21.0200  147.8700      10.6        88       871        99
VIS    2025250    200200   21.0300  147.8500      10.6       101       872        96
VIS    2025250    200200   21.0300  147.8300      10.4       103       862        96
VIS    2025250    200200   21.0200  147.8100      10.2       103       823        98
VIS    2025250    200200   21.0200  147.7700      10.2        95       848        99
VIS    2025250    200200   21.0200  147.7700      10.3        93       853        99
VIS    2025250    200200   21.0200  147.7400      10.8        97       800        98
VIS    2025250    200200   21.0200  147.6900       9.7        95       737        96
VIS    2025250    200200   21.0200  147.6700       9.9       100       732        96
VIS    2025250    200200   21.0400  147.6700      10.2       103       732        94
VIS    2025250    200200   21.0200  147.6400      10.3        95       707        91
VIS    2025250    200200   21.0200  147.6000       8.7        80       707        90
VIS    2025250    200200   21.0100  147.5700       7.9        86       742        94
VIS    2025250    200200   21.0300  147.5700       8.2        85       742        94
VIS    2025250    200200   21.0300  147.5300       9.9        81       853        97
VIS    2025250    200200   21.0300  147.5100      10.1        79       911        97
VIS    2025250    200200   21.0300  147.4700       9.9        79       916        95
VIS    2025250    200200   21.0300  147.4700      10.1        79       916        96
VIS    2025250    200200   21.0300  147.4200      11.6        86       875        99
VIS    2025250    200200   21.0300  147.4200      11.8        87       875        99
VIS    2025250    200200   21.0200  147.2400      10.3        90       943        90
VIS    2025250    200200   21.0200  147.2400      10.2        88       943        93
VIS    2025250    200200   21.0300  147.1900       9.6        90       892        97
VIS    2025250    200200   21.0100  147.1800       9.5        93       827        97
VIS    2025250    200200   21.0200  147.1600       9.5        90       840        97
VIS    2025250    200200   21.0100  147.1400       9.6        88       821        95
VIS    2025250    200200   21.0300  147.1000      10.2        92       775        96
VIS    2025250    200200   21.0300  147.0700      10.8        86       753        92
VIS    2025250    200200   21.0100  146.9800      13.0        79       858        90
VIS    2025250    200200   21.0200  146.9400      13.5        79       868        92
VIS    2025250    200200   21.0300  146.9200      15.1        78       878        92
VIS    2025250    200200   21.0100  146.9000      15.1        77       882        92
VIS    2025250    200200   21.0100  146.8900      15.2        76       885        92
VIS    2025250    200200   21.0100  146.8400      14.5        80       882        93
VIS    2025250    200200   21.0100  146.8400      14.7        81       883        93
VIS    2025250    200200   21.0100  146.8000      14.0        79       883        92
VIS    2025250    200200   21.0100  146.7800      14.8        78       884        91
VIS    2025250    200200   21.0300  146.7600      14.2        80       885        96
VIS    2025250    200200   21.0100  146.7400      14.1        82       894        98
VIS    2025250    200200   21.0200  146.6900      14.2        82       898        99
VIS    2025250    200200   21.0200  146.6900      14.0        81       898        99
VIS    2025250    200200   21.0000  146.6600      13.1        84       898        95
VIS    2025250    200200   21.0200  146.6200      13.7        70       896        94
VIS    2025250    200200   21.0100  146.5900      14.6        72       898        95
VIS    2025250    200200   21.0100  146.5900      14.7        73       898        95
VIS    2025250    200200   21.0100  146.5600      13.9        71       898        95
VIS    2025250    200200   21.0100  146.5200      15.5        69       896        92
VIS    2025250    200200   21.0100  146.5000      15.6        74       884        92
VIS    2025250    200200   21.0200  146.4700      14.2        80       860        92
VIS    2025250    200200   21.0200  146.4600      14.3        80       860        92
VIS    2025250    200200   21.0200  146.3100      16.6        70       898        91
VIS    2025250    200200   21.0200  146.2700      15.3        73       913        95
VIS    2025250    200200   21.0000  146.2500      15.1        75       891        93
VIS    2025250    200200   21.0000  146.1300      12.8        83       766        90
VIS    2025250    200200   21.0000  146.1100      13.8        82       894        99
VIS    2025250    200200   21.0100  146.0800      15.3        81       856        91
VIS    2025250    200200   21.0200  146.0500      12.4        87       812        93
VIS    2025250    200200   21.0200  146.0200      12.1        96       757        90
VIS    2025250    200200   20.9700  142.9000      10.9        97       776        93
VIS    2025250    200200   20.9700  142.8900      11.1        98       781        93
VIS    2025250    200200   20.9700  142.8500      10.5       110       773        98
VIS    2025250    200200   20.9700  142.8400      10.4       111       773        99
VIS    2025250    200200   20.9700  142.8100      11.7       107       767        95
VIS    2025250    200200   21.0500  151.8400       7.1        92       987        94
VIS    2025250    200200   21.0500  151.8200       6.5        87       972        98
VIS    2025250    200200   21.0600  151.5600       6.9        84       983        95
VIS    2025250    200200   21.0600  151.5500       6.7        83       983        96
VIS    2025250    200200   21.0400  151.5000       6.5        90       953        96
VIS    2025250    200200   21.0500  151.5000       7.1        91       971        94
VIS    2025250    200200   21.0500  151.4300       7.5        94       924        92
VIS    2025250    200200   21.0500  151.4100       6.8        86       938        91
VIS    2025250    200200   21.0500  151.2500       6.3        96       923        94
VIS    2025250    200200   21.0400  151.2400       6.2        94       914        97
VIS    2025250    200200   21.0600  151.2000       6.4        82       937        99
VIS    2025250    200200   21.0600  151.1900       6.1        81       937       100
VIS    2025250    200200   21.0600  151.1600       6.0        84       936        93
VIS    2025250    200200   21.0600  151.1400       6.0        84       936        93
VIS    2025250    200200   21.0400  151.1100       4.3        83       971        96
VIS    2025250    200200   21.0300  149.7100       9.7        71       978        90
VIS    2025250    200200   21.0400  149.5600      10.6        83       919        91
VIS    2025250    200200   21.0200  149.5400      10.5        83       913        92
VIS    2025250    200200   21.0200  149.5300      10.4        83       913        92
VIS    2025250    200200   21.0100  149.5000      10.3        82       908        93
VIS    2025250    200200   21.0300  149.4600      10.8        77       900        92
VIS    2025250    200200   21.0100  149.4400      10.8        77       896        91
VIS    2025250    200200   21.0200  149.4100      11.3        78       901        90
VIS    2025250    200200   21.0200  149.3800      10.4        77       921        92
VIS    2025250    200200   21.0200  149.3800      10.3        77       929        91
VIS    2025250    200200   21.0200  149.3400       9.2        77       913        96
VIS    2025250    200200   21.0200  149.3200       8.8        76       910        97
VIS    2025250    200200   21.0300  149.3000       8.8        77       911        97
VIS    2025250    200200   21.0300  149.2600       9.2        78       912        97
VIS    2025250    200200   21.0300  149.2400       8.9        76       918        97
VIS    2025250    200200   21.0200  149.2300       8.5        77       915        99
VIS    2025250    200200   21.0200  149.1900       8.4        81       900        98
VIS    2025250    200200   21.0200  149.1800       8.9        82       868        97
VIS    2025250    200200   21.0100  149.1400       8.6        82       866        98
VIS    2025250    200200   21.0100  149.1300       8.5        84       866        98
VIS    2025250    200200   21.0200  149.0900       8.8        88       856        98
VIS    2025250    200200   21.0200  149.0600       8.9        91       856        98
VIS    2025250    200200   21.0200  149.0500       8.9        92       856        98
VIS    2025250    200200   21.0200  149.0200       8.8        94       856        98
VIS    2025250    200200   21.0200  148.9900       8.6        93       859        99
VIS    2025250    200200   21.0100  148.9500       7.9        84       874        99
VIS    2025250    200200   21.0100  148.9400       7.5        81       876        98
VIS    2025250    200200   21.0100  148.9100       7.5        66       916        90
VIS    2025250    200200   21.0100  148.8500       9.3        72       965        99
VIS    2025250    200200   21.0100  148.8300       9.4        76       958        99
VIS    2025250    200200   21.0100  148.8100       9.1        76       948        99
VIS    2025250    200200   21.0100  148.7800       9.3        71       923        98
VIS    2025250    200200   21.0100  148.7700       9.5        71       920        97
VIS    2025250    200200   21.0200  148.7400       9.7        74       912       100
VIS    2025250    200200   21.0200  148.7200       8.9        77       899        97
VIS    2025250    200200   21.0100  148.6800       8.0        76       906        98
VIS    2025250    200200   21.0200  148.6600       8.3        76       902        97
VIS    2025250    200200   21.0100  148.6500       8.7        75       956        97
VIS    2025250    200200   21.0200  148.6200       8.5        74       958        93
VIS    2025250    200200   21.0100  148.5700       9.1        74       959        99
VIS    2025250    200200   21.0000  148.5500       9.0        71       920        98
VIS    2025250    200200   21.0000  148.5300       8.7        72       910        97
VIS    2025250    200200   21.0200  148.5100       8.5        75       905        98
VIS    2025250    200200   21.0000  148.4800       8.0        76       884        98
VIS    2025250    200200   21.0200  148.4600       7.7        74       884        98
VIS    2025250    200200   21.0100  148.4400       8.0        75       874        98
VIS    2025250    200200   21.0100  148.4000       8.6        76       874        98
VIS    2025250    200200   21.0000  148.3800       8.9        77       879        99
VIS    2025250    200200   21.0000  148.3500       9.2        77       887       100
VIS    2025250    200200   21.0000  148.3200       9.2        75       916        98
VIS    2025250    200200   21.0000  148.3200       9.2        74       916        99
VIS    2025250    200200   21.0200  148.2800       8.7        74       938        94
VIS    2025250    200200   21.0000  148.2500       9.1        75       918        98
VIS    2025250    200200   21.0000  148.2400       9.0        75       913        98
VIS    2025250    200200   21.0000  148.2200       8.8        74       911        97
VIS    2025250    200200   21.0000  148.1700       8.5        80       892        98
VIS    2025250    200200   21.0000  148.1700       8.3        81       892        98
VIS    2025250    200200   21.0100  148.1200       7.1        81       870        94
VIS    2025250    200200   21.0100  148.1200       7.1        82       870        95
VIS    2025250    200200   21.0200  148.0900       7.6        90       870        95
VIS    2025250    200200   21.0000  148.0600       8.5        94       860        92
VIS    2025250    200200   21.0100  148.0400       8.6        87       859        92
VIS    2025250    200200   20.9900  148.0000       8.7        86       861        99
VIS    2025250    200200   20.9900  147.9900       9.4        87       863        99
VIS    2025250    200200   21.0100  147.9500      10.6        72       869        92
VIS    2025250    200200   21.0000  147.9400      10.1        71       869        93
VIS    2025250    200200   21.0000  147.9100       9.3        72       870        95
VIS    2025250    200200   21.0000  147.8700      10.2        79       862        95
VIS    2025250    200200   20.9900  147.8500      10.0        89       831        94
VIS    2025250    200200   21.0000  147.8200      10.2       109       821        92
VIS    2025250    200200   21.0100  147.8000      10.1       104       823        96
VIS    2025250    200200   21.0100  147.7800      10.1        94       853        98
VIS    2025250    200200   21.0100  147.7600      10.3        91       853        98
VIS    2025250    200200   20.9900  147.7200      12.1        89       756        91
VIS    2025250    200200   21.0100  147.7000      10.5        95       738        94
VIS    2025250    200200   21.0100  147.6800       9.9        99       737        97
VIS    2025250    200200   20.9900  147.6400      10.2        99       737        96
VIS    2025250    200200   20.9900  147.6400      10.0        97       728        95
VIS    2025250    200200   21.0000  147.5900       8.2        85       723        93
VIS    2025250    200200   21.0100  147.5700       7.8        86       734        94
VIS    2025250    200200   21.0000  147.5600       8.3        89       742        94
VIS    2025250    200200   20.9900  147.4800      12.1        73       869        93
VIS    2025250    200200   21.0000  147.4400      11.5        79       920        96
VIS    2025250    200200   20.9900  147.4400      11.2        81       921        97
VIS    2025250    200200   21.0000  147.2700      12.2        86       967        94
VIS    2025250    200200   21.0000  147.2500      10.2        91       943        90
VIS    2025250    200200   21.0000  147.2200       9.6        90       913        95
VIS    2025250    200200   20.9800  147.2000       9.4        93       827        97
VIS    2025250    200200   20.9800  147.1700       9.1        94       771        95
VIS    2025250    200200   20.9800  147.1600       9.3        91       771        95
VIS    2025250    200200   20.9800  147.1200      10.8        85       818        91
VIS    2025250    200200   20.9800  147.1100      11.9        82       818        91
VIS    2025250    200200   20.9900  147.0100      13.6        76       877        93
VIS    2025250    200200   20.9900  146.9800      13.5        78       868        91
VIS    2025250    200200   20.9900  146.9200      14.4        87       885        96
VIS    2025250    200200   21.0000  146.8900      15.5        75       891        92
VIS    2025250    200200   21.0000  146.8900      15.4        75       891        92
VIS    2025250    200200   20.9800  146.8500      15.2        78       891        93
VIS    2025250    200200   21.0000  146.8400      15.0        82       883        94
VIS    2025250    200200   20.9900  146.7400      14.4        81       894        94
VIS    2025250    200200   20.9800  146.7000      15.8        74       901        94
VIS    2025250    200200   21.0000  146.6700      13.2        85       898        94
VIS    2025250    200200   21.0000  146.6600      13.0        85       898        95
VIS    2025250    200200   20.9800  146.6300      14.6        76       901        95
VIS    2025250    200200   20.9900  146.6100      14.6        71       901        95
VIS    2025250    200200   20.9900  146.5900      15.0        72       899        95
VIS    2025250    200200   20.9800  146.5500      13.3        71       898        96
VIS    2025250    200200   20.9900  146.5200      14.9        73       896        95
VIS    2025250    200200   20.9900  146.5100      14.7        76       886        94
VIS    2025250    200200   21.0000  146.4700      13.1        90       730        91
VIS    2025250    200200   21.0000  146.2900      16.2        69       923        94
VIS    2025250    200200   20.9900  146.2400      15.1        76       886        93
VIS    2025250    200200   20.9900  146.2300      15.4        75       867        90
VIS    2025250    200200   20.9900  146.1300      12.9        82       885        98
VIS    2025250    200200   20.9900  146.1100      13.8        81       894        99
VIS    2025250    200200   20.9700  146.0700      14.1        79       889        97
VIS    2025250    200200   20.9700  146.0600      13.4        82       885        97
VIS    2025250    200200   20.9900  146.0400      12.3        91       863        98
VIS    2025250    200200   20.9500  143.1100      12.2       121       748        94
VIS    2025250    200200   20.9700  143.0900      11.6       111       759        95
VIS    2025250    200200   20.9500  143.0600      11.4       117       746        97
VIS    2025250    200200   20.9500  142.8700      10.7       107       773        97
VIS    2025250    200200   20.9600  142.8500      10.1       117       768        97
VIS    2025250    200200   20.9500  142.8300      10.0       116       762        99
VIS    2025250    200200   20.9600  142.8200      10.6       113       767        99
VIS    2025250    200200   20.9500  142.7900      10.6       111       755        97
VIS    2025250    200200   20.9600  142.7700      10.6       105       755        95
VIS    2025250    200200   20.9600  142.7300       9.5        99       770        92
VIS    2025250    200200   20.9600  142.7200       9.9        97       770        91
VIS    2025250    200200   20.9500  142.7000      10.0        99       770        92
VIS    2025250    200200   20.9600  142.6500       9.5       102       792        94
VIS    2025250    200200   20.9500  142.6300      11.2       101       786        90
VIS    2025250    200200   21.0300  151.5300       4.6        80       975        92
VIS    2025250    200200   21.0400  151.5000       6.3        89       950        96
VIS    2025250    200200   21.0400  151.4800       7.7        94       931        93
VIS    2025250    200200   21.0200  151.4600       8.3        92       918        92
VIS    2025250    200200   21.0200  151.4200       7.6        89       924        93
VIS    2025250    200200   21.0400  151.4200       7.2        87       938        92
VIS    2025250    200200   21.0200  151.3700       7.6        88       967        94
VIS    2025250    200200   21.0300  151.3600       7.8        88       973        91
VIS    2025250    200200   21.0300  151.3000       7.8        90       966        91
VIS    2025250    200200   21.0200  151.2700       6.8        94       914        95
VIS    2025250    200200   21.0200  151.2500       6.2        98       820        96
VIS    2025250    200200   21.0200  151.2400       6.2        94       782        93
VIS    2025250    200200   21.0100  151.1800       5.7        91       918        91
VIS    2025250    200200   21.0200  151.1500       5.2        93       923        96
VIS    2025250    200200   21.0300  151.1300       4.7        90       934        93
VIS    2025250    200200   20.9900  149.8500       9.2        62       932        90
VIS    2025250    200200   20.9900  149.8100       8.8        71       959        93
VIS    2025250    200200   21.0000  149.6400      10.8        79       907        91
VIS    2025250    200200   21.0100  149.5400      11.3        87       911        90
VIS    2025250    200200   20.9900  149.5100      10.8        88       907        91
VIS    2025250    200200   21.0100  149.5000      10.7        84       908        92
VIS    2025250    200200   20.9900  149.4700      10.1        81       900        95
VIS    2025250    200200   21.0100  149.4400      10.8        76       896        91
VIS    2025250    200200   20.9900  149.4200      10.6        71       899        92
VIS    2025250    200200   21.0100  149.3900      10.3        75       907        93
VIS    2025250    200200   21.0100  149.3800      10.2        76       921        92
VIS    2025250    200200   21.0000  149.3400       9.0        75       924        96
VIS    2025250    200200   21.0000  149.3100       8.5        76       924        96
VIS    2025250    200200   20.9900  149.2800       8.8        80       911        96
VIS    2025250    200200   20.9900  149.2500       8.9        79       911        95
VIS    2025250    200200   21.0000  149.2500       9.0        78       911        97
VIS    2025250    200200   20.9800  149.2200       8.6        80       929        96
VIS    2025250    200200   21.0000  149.1800       9.2        84       874        96
VIS    2025250    200200   20.9900  149.1600       9.2        80       868        96
VIS    2025250    200200   21.0000  149.1300       8.7        82       866        98
VIS    2025250    200200   20.9800  149.1200       8.4        81       869        98
VIS    2025250    200200   21.0000  149.0900       8.6        85       856        96
VIS    2025250    200200   21.0000  149.0600       8.7        91       856        98
VIS    2025250    200200   20.9900  149.0300       8.6        97       858        99
VIS    2025250    200200   20.9800  149.0200       8.6        97       860        98
VIS    2025250    200200   20.9900  148.9800       8.5        89       870        99
VIS    2025250    200200   20.9800  148.9500       8.4        85       876        99
VIS    2025250    200200   21.0000  148.9400       7.7        79       881        98
VIS    2025250    200200   21.0000  148.9100       7.5        67       907        91
VIS    2025250    200200   21.0000  148.8400      10.1        77       965        97
VIS    2025250    200200   20.9900  148.8000       9.8        78       935        97
VIS    2025250    200200   20.9800  148.7800       9.5        76       920        96
VIS    2025250    200200   20.9800  148.7700       9.4        74       916        96
VIS    2025250    200200   20.9900  148.7300       9.7        72       912        99
VIS    2025250    200200   21.0000  148.7000       8.4        75       904        98
VIS    2025250    200200   20.9800  148.6900       8.7        73       910        97
VIS    2025250    200200   20.9800  148.6500       8.5        76       931        98
VIS    2025250    200200   20.9900  148.6400       8.8        77       964        97
VIS    2025250    200200   20.9900  148.5900       9.3        72       980        99
VIS    2025250    200200   20.9800  148.5500      10.2        65       912        97
VIS    2025250    200200   20.9900  148.5400       9.5        69       910        98
VIS    2025250    200200   20.9900  148.5200       8.7        76       896        96
VIS    2025250    200200   21.0000  148.4900       8.3        78       885        99
VIS    2025250    200200   20.9900  148.4500       7.9        73       875        97
VIS    2025250    200200   20.9900  148.4400       8.0        74       871        98
VIS    2025250    200200   20.9700  148.3900       8.6        77       872        99
VIS    2025250    200200   20.9900  148.3800       8.9        76       879        99
VIS    2025250    200200   20.9800  148.3500       9.2        77       887        99
VIS    2025250    200200   20.9900  148.3200       9.3        75       916        98
VIS    2025250    200200   20.9800  148.3100       9.2        77       920        98
VIS    2025250    200200   20.9900  148.2800       8.6        73       938        96
VIS    2025250    200200   20.9800  148.2400       8.8        76       911        99
VIS    2025250    200200   20.9900  148.2300       9.0        75       913        98
VIS    2025250    200200   20.9900  148.2200       8.8        74       911        97
VIS    2025250    200200   20.9700  148.1900       8.5        81       889        96
VIS    2025250    200200   20.9800  148.1400       8.0        85       875        97
VIS    2025250    200200   20.9800  148.1400       7.8        84       875        97
VIS    2025250    200200   20.9900  148.1100       7.4        87       864        96
VIS    2025250    200200   20.9800  148.0700       8.7        97       849        94
VIS    2025250    200200   20.9900  148.0600       8.7        95       860        92
VIS    2025250    200200   20.9700  148.0200       8.2        86       853        98
VIS    2025250    200200   20.9800  148.0000       8.5        85       861        99
VIS    2025250    200200   20.9800  147.9800       9.1        84       864        98
VIS    2025250    200200   20.9700  147.9600       9.5        84       864        99
VIS    2025250    200200   20.9700  147.9200       8.3        90       863        99
VIS    2025250    200200   20.9800  147.8900       9.4        78       853        94
VIS    2025250    200200   20.9900  147.8800      10.1        76       853        92
VIS    2025250    200200   20.9900  147.8600      10.2        85       831        93
VIS    2025250    200200   20.9800  147.8200      10.1       106       774        96
VIS    2025250    200200   20.9900  147.8100      10.2       108       774        94
VIS    2025250    200200   20.9700  147.7700      10.3        91       876        99
VIS    2025250    200200   20.9700  147.7400      11.7        97       861        95
VIS    2025250    200200   20.9800  147.6900      11.0       105       740        96
VIS    2025250    200200   20.9600  147.6400      10.4        98       751        92
VIS    2025250    200200   20.9700  147.6400      10.1        99       740        94
VIS    2025250    200200   20.9700  147.6100       9.3        92       723        91
VIS    2025250    200200   20.9700  147.5700       8.6        89       711        93
VIS    2025250    200200   20.9800  147.5600       8.8        89       724        94
VIS    2025250    200200   20.9600  147.5300       9.5        80       739        91
VIS    2025250    200200   20.9600  147.4300      10.5        82       925        95
VIS    2025250    200200   20.9600  147.3000      11.2        81       828        91
VIS    2025250    200200   20.9700  147.2800      10.8        85       893        98
VIS    2025250    200200   20.9600  147.2400       8.9        87       877        98
VIS    2025250    200200   20.9600  147.2200       9.0        87       837        96
VIS    2025250    200200   20.9600  147.2000       9.1        92       783        95
VIS    2025250    200200   20.9600  147.1700       8.9        94       754        95
VIS    2025250    200200   20.9800  147.1600       9.1        92       765        95
VIS    2025250    200200   20.9700  147.1300      10.3        90       802        95
VIS    2025250    200200   20.9600  147.0900      11.3        82       824        92
VIS    2025250    200200   20.9600  147.0800      10.8        78       860        95
VIS    2025250    200200   20.9800  147.0200      12.6        78       877        95
VIS    2025250    200200   20.9700  146.9900      13.7        73       877        92
VIS    2025250    200200   20.9700  146.9200      14.0        84       889        96
VIS    2025250    200200   20.9600  146.9100      14.9        75       905        94
VIS    2025250    200200   20.9700  146.8800      15.8        72       905        91
VIS    2025250    200200   20.9800  146.8400      15.0        79       891        94
VIS    2025250    200200   20.9700  146.8300      14.5        78       891        95
VIS    2025250    200200   20.9600  146.7300      13.4        79       899        97
VIS    2025250    200200   20.9700  146.7000      16.0        72       901        93
VIS    2025250    200200   20.9600  146.6700      15.3        76       899        93
VIS    2025250    200200   20.9700  146.6300      14.5        80       901        91
VIS    2025250    200200   20.9500  146.6000      15.2        73       901        95
VIS    2025250    200200   20.9600  146.5800      15.3        72       898        93
VIS    2025250    200200   20.9600  146.5500      13.7        72       898        94
VIS    2025250    200200   20.9700  146.5100      12.9        83       869        96
VIS    2025250    200200   20.9700  146.5100      12.8        85       869        96
VIS    2025250    200200   20.9500  146.2900      15.1        70       911        93
VIS    2025250    200200   20.9500  146.2600      13.7        78       888        97
VIS    2025250    200200   20.9500  146.2600      13.7        78       884        96
VIS    2025250    200200   20.9600  146.2200      14.3        80       902        98
VIS    2025250    200200   20.9600  146.2100      14.8        79       902        98
VIS    2025250    200200   20.9600  146.1700      14.1        76       885        95
VIS    2025250    200200   20.9500  146.1500      14.4        76       885        95
VIS    2025250    200200   20.9500  146.1200      14.4        78       894        97
VIS    2025250    200200   20.9500  146.1100      14.4        79       894        97
VIS    2025250    200200   20.9600  146.0800      14.2        82       885        97
VIS    2025250    200200   20.9700  146.0600      13.7        83       885        97
VIS    2025250    200200   20.9300  143.0900      12.4       128       748        93
VIS    2025250    200200   20.9200  143.0800      12.1       131       746        92
VIS    2025250    200200   20.9300  143.0600      11.8       125       746        95
VIS    2025250    200200   20.9400  142.8600      10.6       110       768        97
VIS    2025250    200200   20.9400  142.8400      10.1       114       762        99
VIS    2025250    200200   20.9400  142.8000      10.1       114       755        97
VIS    2025250    200200   20.9400  142.7800      10.1       111       754        98
VIS    2025250    200200   20.9400  142.7500       9.3       108       754        98
VIS    2025250    200200   20.9300  142.7300       9.0       101       753        93
VIS    2025250    200200   20.9400  142.7200       9.2       100       756        93
VIS    2025250    200200   20.9200  142.6400      11.4       100       766        90
VIS    2025250    200200   20.9900  151.5200       5.3        98       968        92
VIS    2025250    200200   21.0000  151.5000       6.4        94       947        93
VIS    2025250    200200   21.0000  151.4700       7.9        92       930        93
VIS    2025250    200200   21.0100  151.4600       8.2        92       918        92
VIS    2025250    200200   21.0100  151.4200       7.6        90       938        92
VIS    2025250    200200   20.9900  151.4000       7.6        90       948        93
VIS    2025250    200200   21.0000  151.3900       7.6        89       961        93
VIS    2025250    200200   21.0000  151.3600       7.5        90       961        93
VIS    2025250    200200   21.0000  151.3400       7.5        88       961        93
VIS    2025250    200200   20.9900  151.2900       7.3        82       898        97
VIS    2025250    200200   21.0000  151.2900       7.4        85       910        96
VIS    2025250    200200   21.0100  151.2600       6.8        90       869        91
VIS    2025250    200200   21.0000  151.1900       6.0        92       903        91
VIS    2025250    200200   20.9900  151.1200       4.1        97       760        98
VIS    2025250    200200   20.9900  149.8600       9.2        63       932        92
VIS    2025250    200200   20.9900  149.8100       8.7        71       959        93
VIS    2025250    200200   20.9800  149.8000       8.6        71       959        94
VIS    2025250    200200   20.9700  149.7600       8.6        73       942        92
VIS    2025250    200200   20.9800  149.6600       9.3        75       991        90
VIS    2025250    200200   20.9800  149.6500       9.5        75       979        90
VIS    2025250    200200   20.9800  149.5100      10.9        88       905        91
VIS    2025250    200200   20.9700  149.4900      11.3        86       900        91
VIS    2025250    200200   20.9800  149.4600      10.5        81       899        93
VIS    2025250    200200   20.9700  149.4500      10.6        80       899        92
VIS    2025250    200200   20.9800  149.4100      10.5        68       901        91
VIS    2025250    200200   20.9800  149.4000       9.6        65       909        92
VIS    2025250    200200   20.9700  149.3600       8.3        74       926        97
VIS    2025250    200200   20.9700  149.3500       8.4        73       926        97
VIS    2025250    200200   20.9800  149.3000       8.6        77       929        95
VIS    2025250    200200   20.9800  149.3000       8.7        78       929        95
VIS    2025250    200200   20.9800  149.2700       8.6        80       929        95
VIS    2025250    200200   20.9800  149.2300       8.7        79       930        96
VIS    2025250    200200   20.9800  149.2200       8.7        80       932        96
VIS    2025250    200200   20.9700  149.1800       9.3        82       928        96
VIS    2025250    200200   20.9600  149.1500       9.1        76       880        95
VIS    2025250    200200   20.9600  149.1300       8.9        75       869        95
VIS    2025250    200200   20.9600  149.1200       8.9        76       869        95
VIS    2025250    200200   20.9600  149.0500       8.4        85       859        98
VIS    2025250    200200   20.9700  149.0200       8.4        95       860        99
VIS    2025250    200200   20.9800  149.0200       8.6        97       860        98
VIS    2025250    200200   20.9800  148.9800       8.5        86       870        99
VIS    2025250    200200   20.9800  148.9500       8.5        84       878        99
VIS    2025250    200200   20.9800  148.9300       8.3        83       882        98
VIS    2025250    200200   20.9600  148.9100       8.6        77       913        95
VIS    2025250    200200   20.9600  148.8900       9.2        73       957        96
VIS    2025250    200200   20.9600  148.8700      10.2        69       965        96
VIS    2025250    200200   20.9700  148.8000      10.4        79       935        95
VIS    2025250    200200   20.9700  148.7900      10.2        78       935        95
VIS    2025250    200200   20.9700  148.7600       9.5        72       920        96
VIS    2025250    200200   20.9700  148.7200       9.8        69       918        99
VIS    2025250    200200   20.9500  148.7000       9.6        70       940       100
VIS    2025250    200200   20.9600  148.6900       9.2        72       933        99
VIS    2025250    200200   20.9700  148.5500      10.3        65       938        98
VIS    2025250    200200   20.9500  148.5200      10.0        71       906        97
VIS    2025250    200200   20.9500  148.5100      10.0        73       906        97
VIS    2025250    200200   20.9500  148.4800       8.9        71       885        98
VIS    2025250    200200   20.9500  148.4400       8.5        76       875        97
VIS    2025250    200200   20.9500  148.4400       8.5        76       874        98
VIS    2025250    200200   20.9500  148.3900       9.0        80       871        99
VIS    2025250    200200   20.9700  148.3800       9.0        78       879        99
VIS    2025250    200200   20.9700  148.3500       9.2        75       891        99
VIS    2025250    200200   20.9600  148.3200       9.3        76       914        95
VIS    2025250    200200   20.9700  148.3100       9.2        79       920        97
VIS    2025250    200200   20.9500  148.2700       8.7        84       911        99
VIS    2025250    200200   20.9500  148.2600       8.7        84       910        99
VIS    2025250    200200   20.9700  148.2300       8.8        79       898        98
VIS    2025250    200200   20.9500  148.2000       9.0        76       895        94
VIS    2025250    200200   20.9700  148.1900       8.5        82       889        96
VIS    2025250    200200   20.9600  148.1500       8.2        88       871        95
VIS    2025250    200200   20.9600  148.1400       8.3        88       869        96
VIS    2025250    200200   20.9500  148.1000       8.8        94       843       100
VIS    2025250    200200   20.9400  148.0700       9.5        94       846        98
VIS    2025250    200200   20.9500  148.0600       9.6        98       846        98
VIS    2025250    200200   20.9400  148.0200       8.8        88       853        99
VIS    2025250    200200   20.9500  148.0000       8.5        82       859        97
VIS    2025250    200200   20.9600  147.9900       8.9        79       862        97
VIS    2025250    200200   20.9600  147.9500       8.8        89       863       100
VIS    2025250    200200   20.9600  147.9200       8.3        92       849        99
VIS    2025250    200200   20.9500  147.9000       8.7        90       828        96
VIS    2025250    200200   20.9400  147.8400      10.9        96       712        90
VIS    2025250    200200   20.9600  147.8200      10.3       101       774        97
VIS    2025250    200200   20.9500  147.7900      10.2        88       873        98
VIS    2025250    200200   20.9600  147.7800      10.3        89       876        98
VIS    2025250    200200   20.9500  147.7400      11.9        94       863        95
VIS    2025250    200200   20.9600  147.7400      12.0        98       846        97
VIS    2025250    200200   20.9600  147.6700      10.8       105       778        99
VIS    2025250    200200   20.9600  147.6400      10.3        96       778        93
VIS    2025250    200200   20.9600  147.6300      10.2        94       751        90
VIS    2025250    200200   20.9500  147.5900       9.6        86       705        91
VIS    2025250    200200   20.9400  147.5700       9.0        84       707        91
VIS    2025250    200200   20.9500  147.5500       9.0        84       711        92
VIS    2025250    200200   20.9500  147.4300      10.4        80       910        97
VIS    2025250    200200   20.9400  147.4100       9.5        85       836        97
VIS    2025250    200200   20.9600  147.3000      11.1        80       828        91
VIS    2025250    200200   20.9600  147.2800      10.4        84       893        96
VIS    2025250    200200   20.9400  147.2500       9.0        87       877        98
VIS    2025250    200200   20.9300  147.2300       8.9        88       797        94
VIS    2025250    200200   20.9400  147.2000       8.7        91       749        93
VIS    2025250    200200   20.9300  147.1700       8.9        96       746        96
VIS    2025250    200200   20.9500  147.1600       8.9        95       751        95
VIS    2025250    200200   20.9400  147.1100      10.1        94       802        97
VIS    2025250    200200   20.9500  147.0900      10.6        80       860        95
VIS    2025250    200200   20.9500  147.0800      10.6        77       860        94
VIS    2025250    200200   20.9500  146.9900      11.9        86       875        91
VIS    2025250    200200   20.9300  146.9600      14.2        75       872        91
VIS    2025250    200200   20.9500  146.9100      15.0        73       905        93
VIS    2025250    200200   20.9400  146.8800      13.6        69       910        92
VIS    2025250    200200   20.9400  146.8400      12.4        69       894        94
VIS    2025250    200200   20.9500  146.8300      13.6        74       886        93
VIS    2025250    200200   20.9300  146.8100      14.1        75       884        91
VIS    2025250    200200   20.9400  146.7700      14.5        78       889        94
VIS    2025250    200200   20.9300  146.7500      14.5        80       892        96
VIS    2025250    200200   20.9300  146.7200      13.3        77       903        97
VIS    2025250    200200   20.9300  146.6900      13.7        78       898        98
VIS    2025250    200200   20.9400  146.6600      15.1        78       890        95
VIS    2025250    200200   20.9400  146.6400      14.9        78       899        95
VIS    2025250    200200   20.9300  146.6300      14.9        75       892        95
VIS    2025250    200200   20.9300  146.5900      15.1        73       894        93
VIS    2025250    200200   20.9300  146.5600      14.6        76       894        94
VIS    2025250    200200   20.9500  146.5300      12.4        79       866        91
VIS    2025250    200200   20.9400  146.4200      15.5        73       881        91
VIS    2025250    200200   20.9300  146.4000      15.3        75       898        95
VIS    2025250    200200   20.9300  146.3600      15.9        74       911        95
VIS    2025250    200200   20.9200  146.3400      16.1        71       923        95
VIS    2025250    200200   20.9300  146.3100      15.8        71       923        94
VIS    2025250    200200   20.9400  146.3100      15.8        70       923        93
VIS    2025250    200200   20.9300  146.2400      14.4        75       916        97
VIS    2025250    200200   20.9400  146.2200      13.8        78       916        98
VIS    2025250    200200   20.9400  146.2100      14.6        77       934        99
VIS    2025250    200200   20.9300  146.1800      14.6        76       914        97
VIS    2025250    200200   20.9400  146.1400      14.8        75       885        93
VIS    2025250    200200   20.9400  146.1100      14.6        77       889        94
VIS    2025250    200200   20.9400  146.0700      14.4        86       782        91
VIS    2025250    200200   20.9200  142.8600      11.5        98       755        90
VIS    2025250    200200   20.9200  142.8400      11.0        99       755        91
VIS    2025250    200200   20.8900  142.8200      10.6        99       753        91
VIS    2025250    200200   20.9000  142.7900      10.6       108       753        96
VIS    2025250    200200   20.9000  142.7500      10.7       101       753        90
VIS    2025250    200200   20.9900  151.5200       6.0        99       968        93
VIS    2025250    200200   20.9700  151.4900       7.2        90       947        93
VIS    2025250    200200   20.9800  151.4600       7.9        90       923        93
VIS    2025250    200200   20.9800  151.4500       8.0        90       923        92
VIS    2025250    200200   20.9800  151.4300       7.7        92       942        93
VIS    2025250    200200   20.9700  151.3900       6.9        91       949        95
VIS    2025250    200200   20.9700  151.3800       7.0        90       949        95
VIS    2025250    200200   20.9700  151.3400       7.1        81       914        96
VIS    2025250    200200   20.9700  151.3300       7.2        82       914        96
VIS    2025250    200200   20.9800  151.2900       7.2        78       869        90
VIS    2025250    200200   20.9800  151.1600       5.3        93       761        90
VIS    2025250    200200   20.9700  151.1300       4.5        95       760        97
VIS    2025250    200200   20.9800  151.1200       4.1        97       760        98
VIS    2025250    200200   20.9500  149.8400       8.7        69       964        92
VIS    2025250    200200   20.9600  149.8200       9.1        70       928        95
VIS    2025250    200200   20.9500  149.7900       8.7        71       925        96
VIS    2025250    200200   20.9500  149.7900       8.7        70       922        96
VIS    2025250    200200   20.9400  149.7500       8.5        70       922        96
VIS    2025250    200200   20.9400  149.7200       8.6        75       969        91
VIS    2025250    200200   20.9600  149.6700       8.6        77       993        92
VIS    2025250    200200   20.9500  149.5000      11.8        86       901        90
VIS    2025250    200200   20.9600  149.4200      10.7        69       905        90
VIS    2025250    200200   20.9500  149.3900      10.1        69       921        91
VIS    2025250    200200   20.9400  149.3800       9.9        75       928        91
VIS    2025250    200200   20.9500  149.3400       8.7        78       930        93
VIS    2025250    200200   20.9600  149.3200       8.7        77       926        94
VIS    2025250    200200   20.9500  149.3100       9.0        78       926        93
VIS    2025250    200200   20.9300  149.2600       9.4        75       930        94
VIS    2025250    200200   20.9400  149.2500       9.4        76       930        98
VIS    2025250    200200   20.9300  149.2300       9.8        79       928        96
VIS    2025250    200200   20.9400  149.2000       9.8        83       937        96
VIS    2025250    200200   20.9300  149.1600       9.9        79       915        96
VIS    2025250    200200   20.9400  149.1400       9.6        76       880        94
VIS    2025250    200200   20.9500  149.1200       9.0        74       869        94
VIS    2025250    200200   20.9400  149.1000       9.1        72       861        92
VIS    2025250    200200   20.9500  149.0400       8.6        86       860        98
VIS    2025250    200200   20.9400  149.0200       8.3        87       866        98
VIS    2025250    200200   20.9400  148.9900       8.9        84       866        95
VIS    2025250    200200   20.9300  148.9600       9.0        80       873        97
VIS    2025250    200200   20.9400  148.9400       8.6        81       881        98
VIS    2025250    200200   20.9500  148.9100       8.4        77       910        97
VIS    2025250    200200   20.9400  148.8800       9.6        74       962        97
VIS    2025250    200200   20.9300  148.8400       9.9        73       971        91
VIS    2025250    200200   20.9400  148.8200      11.6        81       983        90
VIS    2025250    200200   20.9500  148.7800      10.6        76       950        95
VIS    2025250    200200   20.9400  148.7500      10.5        71       960        96
VIS    2025250    200200   20.9300  148.7400      10.4        70       964        99
VIS    2025250    200200   20.9500  148.5500      10.8        62       938        96
VIS    2025250    200200   20.9400  148.5300      10.2        67       912        97
VIS    2025250    200200   20.9400  148.5200      10.1        68       912        97
VIS    2025250    200200   20.9400  148.4800       9.2        71       885        97
VIS    2025250    200200   20.9300  148.4600       9.0        75       877        99
VIS    2025250    200200   20.9400  148.4400       8.5        76       875        98
VIS    2025250    200200   20.9200  148.4100       8.6        78       871        99
VIS    2025250    200200   20.9400  148.3900       9.0        80       871        99
VIS    2025250    200200   20.9300  148.3600       9.6        74       895        99
VIS    2025250    200200   20.9400  148.3300       9.5        71       917        97
VIS    2025250    200200   20.9300  148.3200       9.5        72       917        98
VIS    2025250    200200   20.9200  148.2700       9.0        86       911        99
VIS    2025250    200200   20.9400  148.2700       8.8        87       911        98
VIS    2025250    200200   20.9400  148.2300       9.0        82       904        99
VIS    2025250    200200   20.9300  148.2100       9.2        79       904        99
VIS    2025250    200200   20.9400  148.2000       9.1        76       895        94
VIS    2025250    200200   20.9400  148.1700       8.5        87       875        93
VIS    2025250    200200   20.9400  148.1300       9.1        93       853        98
VIS    2025250    200200   20.9300  148.1200       9.3        95       845       100
VIS    2025250    200200   20.9300  148.0700       9.5        87       845        98
VIS    2025250    200200   20.9400  148.0700       9.4        92       846        98
VIS    2025250    200200   20.9300  148.0200       9.3        85       864        99
VIS    2025250    200200   20.9300  148.0000       9.1        82       855        96
VIS    2025250    200200   20.9300  147.9800       9.0        79       855        95
VIS    2025250    200200   20.9400  147.9500       8.4        85       859        96
VIS    2025250    200200   20.9200  147.9400       7.5        80       828        93
VIS    2025250    200200   20.9400  147.9000       9.0        85       751        91
VIS    2025250    200200   20.9300  147.8400      10.9        99       710        91
VIS    2025250    200200   20.9300  147.8000      10.3        91       774        94
VIS    2025250    200200   20.9300  147.7900      10.5        86       873        98
VIS    2025250    200200   20.9200  147.7600      11.8        90       885        97
VIS    2025250    200200   20.9100  147.6500      10.8        92       823        98
VIS    2025250    200200   20.9300  147.6400      10.7        87       760        91
VIS    2025250    200200   20.9300  147.5200       8.9        85       736        92
VIS    2025250    200200   20.9100  147.5100       8.9        89       749        92
VIS    2025250    200200   20.9300  147.4200       9.5        82       857        97
VIS    2025250    200200   20.9300  147.3800      10.1        95       806        95
VIS    2025250    200200   20.9300  147.3000      11.0        77       867        96
VIS    2025250    200200   20.9300  147.2900      11.1        75       867        95
VIS    2025250    200200   20.9300  147.2500       9.0        88       797        94
VIS    2025250    200200   20.9100  147.2300       9.4        90       751        94
VIS    2025250    200200   20.9200  147.2000       8.9        91       737        94
VIS    2025250    200200   20.9100  147.1900       9.0        94       733        96
VIS    2025250    200200   20.9300  147.1700       9.0        96       746        96
VIS    2025250    200200   20.9100  147.1300       9.6        99       746        98
VIS    2025250    200200   20.9100  147.1000       9.9        79       783        90
VIS    2025250    200200   20.9100  147.0700      12.6        66       872        90
VIS    2025250    200200   20.9200  147.0000      11.8        85       875        97
VIS    2025250    200200   20.9200  146.9800      12.4        82       875        96
VIS    2025250    200200   20.9200  146.9500      15.0        74       875        90
VIS    2025250    200200   20.9100  146.8400      11.1        72       898        93
VIS    2025250    200200   20.9000  146.8400      12.2        73       894        94
VIS    2025250    200200   20.9100  146.7700      14.8        77       889        92
VIS    2025250    200200   20.9100  146.7700      14.9        79       891        94
VIS    2025250    200200   20.9200  146.7200      13.4        76       903        97
VIS    2025250    200200   20.9000  146.6900      13.6        80       867        94
VIS    2025250    200200   20.9100  146.6900      13.6        82       884        97
VIS    2025250    200200   20.9000  146.6500      14.8        76       864        91
VIS    2025250    200200   20.9200  146.6300      15.0        74       892        94
VIS    2025250    200200   20.9000  146.6100      14.3        73       892        93
VIS    2025250    200200   20.9100  146.5800      15.0        73       892        90
VIS    2025250    200200   20.9000  146.5600      14.7        75       877        92
VIS    2025250    200200   20.9000  146.4600      15.6        67       905        92
VIS    2025250    200200   20.9200  146.4200      15.1        75       903        96
VIS    2025250    200200   20.9200  146.4200      15.1        75       902        96
VIS    2025250    200200   20.9000  146.3700      15.7        73       927        97
VIS    2025250    200200   20.9000  146.3500      15.3        74       938        99
VIS    2025250    200200   20.9100  146.3400      15.5        73       927        97
VIS    2025250    200200   20.9200  146.3200      15.8        72       923        96
VIS    2025250    200200   20.9000  146.2700      14.9        70       888        91
VIS    2025250    200200   20.9000  146.2300      15.6        71       958        94
VIS    2025250    200200   20.9100  146.2000      15.1        74       946        98
VIS    2025250    200200   20.9100  146.1800      15.2        75       922        96
VIS    2025250    200200   20.9100  146.1600      15.1        76       885        93
VIS    2025250    200200   20.9000  146.1400      15.2        81       860        90
VIS    2025250    200200   20.8900  142.8200      10.7       100       753        92
VIS    2025250    200200   20.8700  142.8000      10.4       109       754        98
VIS    2025250    200200   20.8700  142.7700      10.0       113       754        99
VIS    2025250    200200   20.8900  142.7500      10.2       103       753        96
VIS    2025250    200200   20.8800  142.7200      10.7       105       753        91
VIS    2025250    200200   20.8700  142.7000      10.2       116       753        97
VIS    2025250    200200   20.8900  142.6700      10.7        97       765        90
VIS    2025250    200200   20.8800  142.6400      10.1        96       765        90
VIS    2025250    200200   20.8700  142.6000       9.0       107       746        96
VIS    2025250    200200   20.9400  151.4800       7.4        80       915        97
VIS    2025250    200200   20.9500  151.4600       7.7        84       915        93
VIS    2025250    200200   20.9400  151.4500       7.6        83       915        92
VIS    2025250    200200   20.9400  151.4000       6.6        81       940        99
VIS    2025250    200200   20.9500  151.3800       6.4        84       934        98
VIS    2025250    200200   20.9600  151.3700       7.0        86       940        97
VIS    2025250    200200   20.9600  151.3300       7.1        78       884        93
VIS    2025250    200200   20.9500  151.3000       6.9        74       868        91
VIS    2025250    200200   20.9400  151.3000       6.6        72       868        91
VIS    2025250    200200   20.9600  151.1300       5.4        89       771        92
VIS    2025250    200200   20.9300  149.7900       8.7        68       922        91
VIS    2025250    200200   20.9300  149.7500       8.5        68       922        96
VIS    2025250    200200   20.9400  149.7500       8.5        69       922        95
VIS    2025250    200200   20.9100  149.3200      10.4        79       935        90
VIS    2025250    200200   20.9200  149.3100      10.2        79       931        91
VIS    2025250    200200   20.9100  149.2700       9.9        74       930        92
VIS    2025250    200200   20.9200  149.2600       9.7        75       930        93
VIS    2025250    200200   20.9100  149.2200       9.8        79       922        95
VIS    2025250    200200   20.9100  149.2100       9.9        82       924        94
VIS    2025250    200200   20.9200  149.1700      10.1        82       921        95
VIS    2025250    200200   20.9200  149.1600      10.0        81       898        94
VIS    2025250    200200   20.9300  149.1300       9.6        75       877        94
VIS    2025250    200200   20.9100  149.1100       9.6        75       869        93
VIS    2025250    200200   20.9200  149.0600       9.6        68       858        90
VIS    2025250    200200   20.9100  149.0300       8.4        72       866        94
VIS    2025250    200200   20.9200  149.0100       8.4        82       866        93
VIS    2025250    200200   20.9100  148.9600       8.9        80       876        97
VIS    2025250    200200   20.9300  148.9600       9.0        80       876        97
VIS    2025250    200200   20.9200  148.9300       8.3        74       884        97
VIS    2025250    200200   20.9100  148.9100       8.1        67       916        96
VIS    2025250    200200   20.9200  148.8300       9.6        75       971        94
VIS    2025250    200200   20.9000  148.7900      10.9        72       961        95
VIS    2025250    200200   20.9200  148.7800      11.3        72       965        94
VIS    2025250    200200   20.9000  148.7500      10.8        72       968        94
VIS    2025250    200200   20.9100  148.7100       9.9        71       984        99
VIS    2025250    200200   20.9200  148.7000      10.2        71       974        99
VIS    2025250    200200   20.9200  148.6800       9.8        72       960        98
VIS    2025250    200200   20.9200  148.6600       8.9        73       960        93
VIS    2025250    200200   20.9100  148.6100       9.0        76       992        98
VIS    2025250    200200   20.9100  148.6100       9.0        78       991        99
VIS    2025250    200200   20.9000  148.5600       9.5        72       991        99
VIS    2025250    200200   20.9000  148.5500       9.4        73       991        98
VIS    2025250    200200   20.9200  148.5100      10.1        70       906        98
VIS    2025250    200200   20.9200  148.5100      10.1        70       906        98
VIS    2025250    200200   20.9100  148.4800       9.7        72       892        98
VIS    2025250    200200   20.9000  148.4500       9.8        74       875        98
VIS    2025250    200200   20.9000  148.4300       9.0        74       874        98
VIS    2025250    200200   20.9100  148.3900       8.8        76       873        99
VIS    2025250    200200   20.9100  148.3600       9.4        73       892        99
VIS    2025250    200200   20.9100  148.3300       9.5        69       914        98
VIS    2025250    200200   20.9100  148.3200       9.3        72       916        99
VIS    2025250    200200   20.9000  148.3000       8.5        81       903        99
VIS    2025250    200200   20.9000  148.2700       8.7        85       900        99
VIS    2025250    200200   20.9100  148.2300       9.6        79       913       100
VIS    2025250    200200   20.9000  148.2300       9.6        77       913        99
VIS    2025250    200200   20.9200  148.2000       9.2        74       895        95
VIS    2025250    200200   20.9100  148.1700       9.0        88       868        94
VIS    2025250    200200   20.9000  148.1500       9.6        99       856        97
VIS    2025250    200200   20.9000  148.1200       9.5       100       839       100
VIS    2025250    200200   20.9100  148.0800       9.3        86       842        97
VIS    2025250    200200   20.9100  148.0800       9.4        84       843        96
VIS    2025250    200200   20.9100  148.0300       9.8        77       864        95
VIS    2025250    200200   20.9000  148.0100       9.2        83       856        94
VIS    2025250    200200   20.9000  148.0000       9.4        84       855        94
VIS    2025250    200200   20.9000  147.9600       8.7        77       839        94
VIS    2025250    200200   20.8900  147.8400      10.0       102       705        94
VIS    2025250    200200   20.8900  147.8100      10.7       102       708        92
VIS    2025250    200200   20.8900  147.7900      10.9        97       810        97
VIS    2025250    200200   20.9100  147.7600      11.5        91       885        97
VIS    2025250    200200   20.9100  147.7400      12.5        82       908        97
VIS    2025250    200200   20.8900  147.7000      12.3        84       908        93
VIS    2025250    200200   20.8900  147.7000      12.0        86       905        93
VIS    2025250    200200   20.8900  147.6700      10.8        94       855        96
VIS    2025250    200200   20.9100  147.6500      10.7        93       823        98
VIS    2025250    200200   20.9000  147.6200       9.8        86       752        90
VIS    2025250    200200   20.8900  147.5400       9.1        95       709        93
VIS    2025250    200200   20.9000  147.5100       9.0        92       749        95
VIS    2025250    200200   20.9100  147.4800       9.5        87       752        91
VIS    2025250    200200   20.9100  147.4400       9.5        79       758        90
VIS    2025250    200200   20.9000  147.3400      10.9        86       866        97
VIS    2025250    200200   20.8900  147.3000      13.6        80       926        96
VIS    2025250    200200   20.8800  147.2900      13.1        79       926        98
VIS    2025250    200200   20.9000  147.2700      11.1        77       866        96
VIS    2025250    200200   20.9000  147.2400       9.5        87       782        93
VIS    2025250    200200   20.8800  147.2000      10.1       104       733        99
VIS    2025250    200200   20.9000  147.1900       9.2        97       733        97
VIS    2025250    200200   20.8800  147.1600       8.9        95       731        96
VIS    2025250    200200   20.9000  147.1500       9.4        97       735        97
VIS    2025250    200200   20.9000  147.1100       9.8        87       772        93
VIS    2025250    200200   20.8800  147.0700      12.6        73       877        94
VIS    2025250    200200   20.8800  147.0500      13.9        70       877        90
VIS    2025250    200200   20.8900  147.0000      11.3        75       857        91
VIS    2025250    200200   20.8900  146.9800      12.5        75       875        94
VIS    2025250    200200   20.8900  146.9700      13.5        76       875        93
VIS    2025250    200200   20.8900  146.9300      15.9        73       885        90
VIS    2025250    200200   20.9000  146.8800      11.6        74       926        98
VIS    2025250    200200   20.8800  146.8500      13.2        75       905        94
VIS    2025250    200200   20.8800  146.8500      13.4        76       903        95
VIS    2025250    200200   20.9000  146.7800      14.7        73       889        90
VIS    2025250    200200   20.8900  146.7300      14.6        78       896        96
VIS    2025250    200200   20.8900  146.7200      14.7        77       896        96
VIS    2025250    200200   20.8900  146.6000      13.9        73       881        90
VIS    2025250    200200   20.8900  146.6000      14.0        74       884        91
VIS    2025250    200200   20.9000  146.5700      14.7        74       877        91
VIS    2025250    200200   20.8800  146.4900      16.0        68       919        93
VIS    2025250    200200   20.8900  146.4700      16.0        67       907        90
VIS    2025250    200200   20.8800  146.4300      15.8        67       913        93
VIS    2025250    200200   20.8800  146.3800      16.4        69       940        96
VIS    2025250    200200   20.8800  146.3700      16.4        70       940        96
VIS    2025250    200200   20.8800  146.3400      15.6        74       957        98
VIS    2025250    200200   20.8700  146.3200      16.1        74       913        95
VIS    2025250    200200   20.8700  146.2400      15.4        67       946        96
VIS    2025250    200200   20.8900  146.2300      15.7        71       958        95
VIS    2025250    200200   20.8800  146.1800      15.1        81       927        99
VIS    2025250    200200   20.8700  146.1500      15.0        81       889        96
VIS    2025250    200200   20.8600  142.8000      10.6       115       754        95
VIS    2025250    200200   20.8600  142.7800      10.0       115       757        96
VIS    2025250    200200   20.8600  142.7600       9.6       115       754        98
VIS    2025250    200200   20.8400  142.7400      10.5       125       754        95
VIS    2025250    200200   20.8600  142.7000      10.7       120       753        95
VIS    2025250    200200   20.8500  142.6900      10.8       127       759        94
VIS    2025250    200200   20.8400  142.6400       9.5       114       760        98
VIS    2025250    200200   20.8400  142.6200       9.4       112       747        96
VIS    2025250    200200   20.9400  151.9000       5.9        97       974        91
VIS    2025250    200200   20.9200  151.5500       7.3        74       940        93
VIS    2025250    200200   20.9200  151.5500       7.3        77       940        94
VIS    2025250    200200   20.9200  151.5100       7.6        80       939        96
VIS    2025250    200200   20.9300  151.4800       7.4        77       915        97
VIS    2025250    200200   20.9300  151.4600       7.4        77       908        96
VIS    2025250    200200   20.9300  151.4300       7.4        78       915        94
VIS    2025250    200200   20.9300  151.4000       6.4        74       899        99
VIS    2025250    200200   20.9400  151.3800       6.3        79       885        97
VIS    2025250    200200   20.9300  151.3100       6.8        69       878        92
VIS    2025250    200200   20.9300  151.2900       6.7        71       868        90
VIS    2025250    200200   20.9000  149.7300       8.7        70       967        92
VIS    2025250    200200   20.9100  149.7000       8.3        74       974        93
VIS    2025250    200200   20.9100  149.3200      10.4        79       946        90
VIS    2025250    200200   20.9000  149.3200      10.5        79       937        90
VIS    2025250    200200   20.8900  149.2900      10.3        78       931        91
VIS    2025250    200200   20.9000  149.2500      10.0        74       928        92
VIS    2025250    200200   20.8900  149.2200      10.2        76       926        96
VIS    2025250    200200   20.9000  149.2200      10.1        78       924        94
VIS    2025250    200200   20.8900  149.1800       9.8        83       921        94
VIS    2025250    200200   20.8800  149.1500       9.3        80       877        96
VIS    2025250    200200   20.9000  149.1200       9.4        77       876        95
VIS    2025250    200200   20.9000  149.1000       9.6        74       869        93
VIS    2025250    200200   20.9000  149.0700       9.9        70       858        90
VIS    2025250    200200   20.8800  149.0400       8.6        71       866        94
VIS    2025250    200200   20.9000  149.0300       8.2        72       866        95
VIS    2025250    200200   20.8900  149.0100       7.9        79       894        95
VIS    2025250    200200   20.8900  148.9900       8.2        85       887        97
VIS    2025250    200200   20.9000  148.9500       8.5        77       880        98
VIS    2025250    200200   20.8900  148.9300       8.4        70       888        96
VIS    2025250    200200   20.9000  148.8400       9.1        76       956        95
VIS    2025250    200200   20.9000  148.8400       9.0        77       956        93
VIS    2025250    200200   20.8900  148.8000      10.6        72       961        96
VIS    2025250    200200   20.8900  148.7800      10.7        72       961        95
VIS    2025250    200200   20.8900  148.7600      10.9        72       968        93
VIS    2025250    200200   20.8900  148.7200      10.2        72       988        99
VIS    2025250    200200   20.8800  148.6600       9.4        72       984       100
VIS    2025250    200200   20.8800  148.6200       8.8        72       975        99
VIS    2025250    200200   20.8800  148.6100       8.8        73       975        99
VIS    2025250    200200   20.8800  148.5700       9.5        73       974       100
VIS    2025250    200200   20.8700  148.5600       9.3        72       974       100
VIS    2025250    200200   20.8800  148.5100       8.8        71       936        99
VIS    2025250    200200   20.8800  148.5100       8.9        71       936        99
VIS    2025250    200200   20.8700  148.4800       9.2        70       891        97
VIS    2025250    200200   20.8900  148.4500       9.8        74       875        97
VIS    2025250    200200   20.8800  148.4200       9.4        72       873        97
VIS    2025250    200200   20.8700  148.4000       9.2        73       871        97
VIS    2025250    200200   20.8900  148.3700       9.4        73       888        98
VIS    2025250    200200   20.8900  148.3400       9.5        70       910        99
VIS    2025250    200200   20.8800  148.3300       9.6        71       902        98
VIS    2025250    200200   20.8800  148.3100       8.7        75       903        98
VIS    2025250    200200   20.8800  148.2700       8.4        82       900        99
VIS    2025250    200200   20.8900  148.2400       9.5        77       913        98
VIS    2025250    200200   20.8800  148.2300       9.5        76       913        97
VIS    2025250    200200   20.8900  148.1900       8.8        83       875        95
VIS    2025250    200200   20.8700  148.1700       9.0        93       861        97
VIS    2025250    200200   20.8900  148.1500       9.6        99       856        97
VIS    2025250    200200   20.8900  148.1300       9.5       100       839        99
VIS    2025250    200200   20.8700  148.0900       9.5        94       854        92
VIS    2025250    200200   20.8900  148.0800       9.5        85       842        94
VIS    2025250    200200   20.8700  148.0400       9.4        81       862        96
VIS    2025250    200200   20.8900  148.0300       9.7        78       863        96
VIS    2025250    200200   20.8800  148.0000       9.0        85       839        95
VIS    2025250    200200   20.8800  147.9700       8.5        86       804        94
VIS    2025250    200200   20.8900  147.9300       7.4        88       716        90
VIS    2025250    200200   20.8900  147.8800       8.7        91       703        91
VIS    2025250    200200   20.8800  147.8700       8.6        96       701        95
VIS    2025250    200200   20.8900  147.8400      10.1       102       703        92
VIS    2025250    200200   20.8900  147.8100      11.0       102       716        91
VIS    2025250    200200   20.8900  147.7900      11.1        97       810        96
VIS    2025250    200200   20.8700  147.7600      11.1        82       883        97
VIS    2025250    200200   20.8600  147.7300      12.4        78       926        97
VIS    2025250    200200   20.8700  147.7300      12.6        79       926        97
VIS    2025250    200200   20.8600  147.6900      12.1        78       915        98
VIS    2025250    200200   20.8700  147.6700      10.8        87       858        95
VIS    2025250    200200   20.8700  147.6500      10.0        90       786        93
VIS    2025250    200200   20.8600  147.6100      10.5        83       760        91
VIS    2025250    200200   20.8600  147.6000      10.4        84       760        91
VIS    2025250    200200   20.8700  147.5300       9.1        93       709        92
VIS    2025250    200200   20.8700  147.5100       9.5        95       740        96
VIS    2025250    200200   20.8700  147.5000       9.6        95       740        96
VIS    2025250    200200   20.8800  147.4700      10.1        88       740        93
VIS    2025250    200200   20.8600  147.4400      10.4        85       736        91
VIS    2025250    200200   20.8700  147.4300      10.1        84       736        91
VIS    2025250    200200   20.8600  147.3600      10.9        75       908        98
VIS    2025250    200200   20.8600  147.3500      11.3        78       943        99
VIS    2025250    200200   20.8600  147.3300      13.9        82       943        98
VIS    2025250    200200   20.8700  147.2900      13.3        81       926       100
VIS    2025250    200200   20.8600  147.2700      11.3        84       855        97
VIS    2025250    200200   20.8600  147.2400      10.0        93       763        95
VIS    2025250    200200   20.8600  147.2200      10.4       102       738        96
VIS    2025250    200200   20.8800  147.2000      10.2       104       733        99
VIS    2025250    200200   20.8700  147.1600       9.1        89       731        94
VIS    2025250    200200   20.8700  147.1200      10.6        83       780        91
VIS    2025250    200200   20.8600  147.1000      10.4        85       796        93
VIS    2025250    200200   20.8800  147.0700      12.3        74       877        94
VIS    2025250    200200   20.8600  147.0000      12.6        76       867        92
VIS    2025250    200200   20.8800  146.9600      15.2        75       875        90
VIS    2025250    200200   20.8700  146.9300      15.3        76       891        93
VIS    2025250    200200   20.8700  146.9100      15.0        76       915        94
VIS    2025250    200200   20.8600  146.8900      13.8        77       924        93
VIS    2025250    200200   20.8600  146.8600      14.5        69       908        92
VIS    2025250    200200   20.8700  146.8500      14.0        75       903        94
VIS    2025250    200200   20.8700  146.8100      14.5        74       898        91
VIS    2025250    200200   20.8600  146.7400      15.4        75       892        93
VIS    2025250    200200   20.8600  146.6600      12.9        82       811        91
VIS    2025250    200200   20.8500  146.6500      12.3        84       807        91
VIS    2025250    200200   20.8600  146.6000      13.8        77       854        90
VIS    2025250    200200   20.8700  146.5800      15.1        75       875        91
VIS    2025250    200200   20.8500  146.5300      16.5        75       898        92
VIS    2025250    200200   20.8700  146.5100      15.7        72       873        90
VIS    2025250    200200   20.8600  146.4900      15.5        68       926        94
VIS    2025250    200200   20.8500  146.4700      16.2        64       927        90
VIS    2025250    200200   20.8700  146.4300      15.9        66       926        94
VIS    2025250    200200   20.8600  146.3900      17.3        64       941        92
VIS    2025250    200200   20.8600  146.3600      16.3        72       964        97
VIS    2025250    200200   20.8500  146.3500      16.6        71       952        97
VIS    2025250    200200   20.8600  146.3200      16.2        73       925        96
VIS    2025250    200200   20.8500  146.3000      16.9        64       925        91
VIS    2025250    200200   20.8600  146.2400      15.4        67       943        95
VIS    2025250    200200   20.8500  146.2200      14.7        75       940        98
VIS    2025250    200200   20.8500  146.1900      14.8        87       908        99
VIS    2025250    200200   20.8600  146.1600      14.8        84       881        94
VIS    2025250    200200   20.8600  146.1500      14.8        83       881        94
VIS    2025250    200200   20.8700  146.1200      13.2        93       819        94
VIS    2025250    200200   20.8400  142.7400      10.7       127       756        93
VIS    2025250    200200   20.8200  142.7100      11.6       118       767        94
VIS    2025250    200200   20.8300  142.6800      10.8       124       765        94
VIS    2025250    200200   20.8300  142.6500       9.7       115       761        98
VIS    2025250    200200   20.8200  142.6200       9.7       108       747        96
VIS    2025250    200200   20.9000  151.8900       6.2        79       999        99
VIS    2025250    200200   20.9000  151.8600       6.4        84       995        95
VIS    2025250    200200   20.8900  151.5600       7.0        70       940        93
VIS    2025250    200200   20.9000  151.5400       7.0        72       939        96
VIS    2025250    200200   20.9100  151.5200       7.2        77       939        97
VIS    2025250    200200   20.8900  151.4800       7.4        70       900        96
VIS    2025250    200200   20.9100  151.4600       7.1        71       900        98
VIS    2025250    200200   20.9000  151.4300       6.1        67       875        95
VIS    2025250    200200   20.9100  151.4200       6.1        68       885        97
VIS    2025250    200200   20.9000  151.3000       6.7        75       913        97
VIS    2025250    200200   20.9100  151.3000       6.6        76       913        96
VIS    2025250    200200   20.9000  151.2600       6.6        68       888        90
VIS    2025250    200200   20.9000  151.1500       7.2        88       913        95
VIS    2025250    200200   20.8800  149.7700       8.1        71       965        94
VIS    2025250    200200   20.8600  149.3300       9.9        86       938        91
VIS    2025250    200200   20.8800  149.3000      10.3        81       932        91
VIS    2025250    200200   20.8800  149.2800      10.2        80       928        91
VIS    2025250    200200   20.8800  149.2500      10.2        76       926        92
VIS    2025250    200200   20.8700  149.2500      10.1        76       919        92
VIS    2025250    200200   20.8700  149.2100       9.6        77       914        96
VIS    2025250    200200   20.8700  149.1900       9.2        79       893        95
VIS    2025250    200200   20.8600  149.1700       8.7        76       880        96
VIS    2025250    200200   20.8700  149.1400       9.1        78       875        96
VIS    2025250    200200   20.8700  149.1200       9.3        78       875        95
VIS    2025250    200200   20.8700  149.1000       9.1        77       867        94
VIS    2025250    200200   20.8600  149.0500       8.3        76       889        96
VIS    2025250    200200   20.8700  149.0400       8.4        73       883        97
VIS    2025250    200200   20.8600  149.0000       8.1        79       894        98
VIS    2025250    200200   20.8600  148.9900       8.1        81       894        99
VIS    2025250    200200   20.8700  148.9700       8.3        83       891        97
VIS    2025250    200200   20.8600  148.9400       8.2        76       898        98
VIS    2025250    200200   20.8500  148.9100       8.6        64       916        92
VIS    2025250    200200   20.8500  148.8200       9.6        73       987        98
VIS    2025250    200200   20.8600  148.8000      10.4        71       972        95
VIS    2025250    200200   20.8600  148.7700      10.4        73       961        93
VIS    2025250    200200   20.8600  148.7700      10.4        73       961        92
VIS    2025250    200200   20.8500  148.7300      10.5        74       986        99
VIS    2025250    200200   20.8700  148.6700       9.6        72       984       100
VIS    2025250    200200   20.8700  148.6300       8.8        72       975       100
VIS    2025250    200200   20.8600  148.6100       9.0        69       975        99
VIS    2025250    200200   20.8700  148.5900       9.3        71       969       100
VIS    2025250    200200   20.8500  148.5500       9.4        70       958        99
VIS    2025250    200200   20.8600  148.5400       9.4        71       972       100
VIS    2025250    200200   20.8600  148.5200       9.2        68       949        97
VIS    2025250    200200   20.8700  148.4800       9.3        69       891        97
VIS    2025250    200200   20.8500  148.4500       9.6        68       893        96
VIS    2025250    200200   20.8600  148.4200       9.6        72       875        97
VIS    2025250    200200   20.8500  148.4100       9.5        73       875        97
VIS    2025250    200200   20.8700  148.3700       9.5        72       880        97
VIS    2025250    200200   20.8500  148.3500       9.9        70       884        95
VIS    2025250    200200   20.8700  148.3300       9.7        70       893        97
VIS    2025250    200200   20.8700  148.3000       8.6        78       893        98
VIS    2025250    200200   20.8600  148.2900       8.2        85       885        99
VIS    2025250    200200   20.8600  148.2500       8.8        79       900        99
VIS    2025250    200200   20.8600  148.2400       8.9        76       909        97
VIS    2025250    200200   20.8500  148.2100       8.3        81       883        95
VIS    2025250    200200   20.8500  148.1700       9.0       100       861        99
VIS    2025250    200200   20.8600  148.1600       9.1        95       861        98
VIS    2025250    200200   20.8400  148.1200       9.5        99       841        97
VIS    2025250    200200   20.8600  148.0900       9.5        97       842        91
VIS    2025250    200200   20.8600  148.0900       9.5        94       854        92
VIS    2025250    200200   20.8600  148.0400       9.3        82       862        97
VIS    2025250    200200   20.8500  148.0200       8.6        80       824        92
VIS    2025250    200200   20.8500  148.0100       8.6        81       804        91
VIS    2025250    200200   20.8400  147.9700       8.7        98       724        97
VIS    2025250    200200   20.8600  147.9600       8.1        94       728        97
VIS    2025250    200200   20.8600  147.7700      11.2        79       883        96
VIS    2025250    200200   20.8500  147.7600      11.2        75       885        95
VIS    2025250    200200   20.8500  147.7300      12.4        79       926        98
VIS    2025250    200200   20.8600  147.6900      12.2        79       915        99
VIS    2025250    200200   20.8600  147.6900      11.8        80       902        98
VIS    2025250    200200   20.8400  147.6600      10.9        83       862        98
VIS    2025250    200200   20.8400  147.6300      11.1        82       820        93
VIS    2025250    200200   20.8600  147.6000      10.5        84       760        91
VIS    2025250    200200   20.8600  147.5800      10.0        88       742        90
VIS    2025250    200200   20.8400  147.5600       9.0        90       708        90
VIS    2025250    200200   20.8600  147.5200       9.3        94       716        95
VIS    2025250    200200   20.8600  147.5100       9.3        94       724        95
VIS    2025250    200200   20.8400  147.4800       9.4        92       733        96
VIS    2025250    200200   20.8500  147.4600       9.8        88       733        93
VIS    2025250    200200   20.8500  147.4300      10.3        81       746        90
VIS    2025250    200200   20.8400  147.3600      11.6        78       861        96
VIS    2025250    200200   20.8600  147.3500      11.9        80       943        98
VIS    2025250    200200   20.8400  147.3300      13.1        83       946        98
VIS    2025250    200200   20.8400  147.3000      12.9        86       926        97
VIS    2025250    200200   20.8500  147.2400      10.4        97       741        93
VIS    2025250    200200   20.8300  147.1900      10.4        84       727        91
VIS    2025250    200200   20.8400  147.0900      10.6        78       811        91
VIS    2025250    200200   20.8400  147.0000      11.9        77       855        92
VIS    2025250    200200   20.8500  146.9700      12.4        80       867        95
VIS    2025250    200200   20.8400  146.9600      13.9        78       880        94
VIS    2025250    200200   20.8500  146.9300      14.4        78       891        95
VIS    2025250    200200   20.8400  146.9100      14.8        76       903        94
VIS    2025250    200200   20.8300  146.8700      14.9        72       908        92
VIS    2025250    200200   20.8300  146.8400      14.8        70       903        92
VIS    2025250    200200   20.8300  146.8200      15.1        70       898        92
VIS    2025250    200200   20.8300  146.7900      14.6        74       896        93
VIS    2025250    200200   20.8300  146.7800      14.3        74       896        93
VIS    2025250    200200   20.8400  146.7400      15.5        76       894        94
VIS    2025250    200200   20.8500  146.7300      16.0        75       892        92
VIS    2025250    200200   20.8400  146.6100      13.0        79       822        90
VIS    2025250    200200   20.8300  146.5800      16.7        76       906        94
VIS    2025250    200200   20.8300  146.5200      16.4        73       925        95
VIS    2025250    200200   20.8300  146.4900      15.4        71       941        97
VIS    2025250    200200   20.8300  146.4800      15.4        69       935        96
VIS    2025250    200200   20.8400  146.4200      16.5        66       941        94
VIS    2025250    200200   20.8200  146.3900      16.2        69       979        97
VIS    2025250    200200   20.8200  146.3800      16.4        70       980        97
VIS    2025250    200200   20.8300  146.3500      16.8        70       949        96
VIS    2025250    200200   20.8300  146.3400      16.8        69       946        96
VIS    2025250    200200   20.8300  146.3000      16.1        65       927        93
VIS    2025250    200200   20.8400  146.2900      16.4        62       926        91
VIS    2025250    200200   20.8300  146.2000      14.4        86       902        99
VIS    2025250    200200   20.8400  146.1800      15.1        87       900        99
VIS    2025250    200200   20.8300  146.1600      14.6        85       856        93
VIS    2025250    200200   20.7900  142.7500      12.3       118       760        94
VIS    2025250    200200   20.7900  142.7500      12.6       115       761        90
VIS    2025250    200200   20.8100  142.7200      11.6       115       767        93
VIS    2025250    200200   20.8100  142.6800      10.2       115       771        97
VIS    2025250    200200   20.8100  142.6700      10.1       111       771        94
VIS    2025250    200200   20.8700  151.8900       6.4        74       992        99
VIS    2025250    200200   20.8700  151.8700       6.4        80       986        98
VIS    2025250    200200   20.8700  151.5600       7.3        76       908        91
VIS    2025250    200200   20.8700  151.5300       6.7        70       905        97
VIS    2025250    200200   20.8700  151.5200       6.7        69       902        97
VIS    2025250    200200   20.8700  151.4800       7.3        68       902        95
VIS    2025250    200200   20.8900  151.4700       7.3        68       892        94
VIS    2025250    200200   20.8800  151.4400       6.2        67       867        91
VIS    2025250    200200   20.8700  151.3200       6.2        68       898        98
VIS    2025250    200200   20.8800  151.2800       6.5        74       916        92
VIS    2025250    200200   20.8800  151.1200       7.3        89       960        91
VIS    2025250    200200   20.8800  151.1200       7.3        89       940        91
VIS    2025250    200200   20.8400  149.8600       8.8        73       952        95
VIS    2025250    200200   20.8500  149.8100       8.7        74       940        97
VIS    2025250    200200   20.8500  149.7900       8.7        74       900        95
VIS    2025250    200200   20.8500  149.7700       9.2        74       965        90
VIS    2025250    200200   20.8500  149.7400       9.5        76       965        91
VIS    2025250    200200   20.8400  149.7300       9.3        77       965        91
VIS    2025250    200200   20.8400  149.3100       9.7        87       912        94
VIS    2025250    200200   20.8500  149.3000       9.6        88       912        94
VIS    2025250    200200   20.8500  149.2700       9.9        81       917        92
VIS    2025250    200200   20.8300  149.2300      10.3        75       914        94
VIS    2025250    200200   20.8400  149.2000       9.5        72       908        96
VIS    2025250    200200   20.8500  149.1800       8.9        75       880        95
VIS    2025250    200200   20.8500  149.1600       8.7        75       880        96
VIS    2025250    200200   20.8300  149.1200       9.6        77       880        94
VIS    2025250    200200   20.8300  149.1200       9.6        77       875        93
VIS    2025250    200200   20.8300  149.0700       8.2        76       871        93
VIS    2025250    200200   20.8400  149.0700       8.0        76       871        94
VIS    2025250    200200   20.8400  149.0200       8.3        78       893        99
VIS    2025250    200200   20.8400  149.0100       8.3        76       893        99
VIS    2025250    200200   20.8300  148.9800       8.0        72       891        98
VIS    2025250    200200   20.8400  148.9600       7.9        77       894        98
VIS    2025250    200200   20.8500  148.9300       8.3        72       904        98
VIS    2025250    200200   20.8300  148.9000       9.7        66       952        91
VIS    2025250    200200   20.8400  148.8900       9.4        65       952        95
VIS    2025250    200200   20.8300  148.8200       9.7        71       986        97
VIS    2025250    200200   20.8300  148.7900       9.6        73       964        99
VIS    2025250    200200   20.8500  148.7800      10.0        72       969        95
VIS    2025250    200200   20.8300  148.7500      10.6        74       955        99
VIS    2025250    200200   20.8300  148.7400      10.8        74       956        99
VIS    2025250    200200   20.8300  148.7000      10.6        75       977        99
VIS    2025250    200200   20.8300  148.6900      10.5        75       978        99
VIS    2025250    200200   20.8300  148.6200       9.9        68       992        94
VIS    2025250    200200   20.8500  148.6100       9.5        69       975        97
VIS    2025250    200200   20.8300  148.5900       9.3        69       961        94
VIS    2025250    200200   20.8400  148.5500       9.4        70       958        98
VIS    2025250    200200   20.8400  148.5300       9.5        68       958        97
VIS    2025250    200200   20.8400  148.5100       9.4        67       936        95
VIS    2025250    200200   20.8400  148.4900       9.4        67       898        96
VIS    2025250    200200   20.8400  148.4600       9.4        68       896        96
VIS    2025250    200200   20.8300  148.4200       9.5        76       887        98
VIS    2025250    200200   20.8400  148.4000       9.1        75       871        98
VIS    2025250    200200   20.8400  148.3700       9.3        72       875        97
VIS    2025250    200200   20.8300  148.3600       9.6        69       876        95
VIS    2025250    200200   20.8300  148.3300       9.8        68       887        95
VIS    2025250    200200   20.8400  148.3100       9.2        75       885        98
VIS    2025250    200200   20.8300  148.2800       7.9        84       882        99
VIS    2025250    200200   20.8200  148.2600       7.7        73       883        97
VIS    2025250    200200   20.8200  148.2300       8.0        73       883        94
VIS    2025250    200200   20.8300  148.2000       8.3        87       868        98
VIS    2025250    200200   20.8300  148.1800       8.4        96       856        99
VIS    2025250    200200   20.8200  148.1600       8.3        98       851        99
VIS    2025250    200200   20.8400  148.1200       9.5        99       842        97
VIS    2025250    200200   20.8300  148.1100       9.5        98       842        97
VIS    2025250    200200   20.8200  148.0700       9.0        93       848        97
VIS    2025250    200200   20.8300  148.0600       9.2        93       849        97
VIS    2025250    200200   20.8400  148.0400       8.7        84       848        96
VIS    2025250    200200   20.8200  148.0100       8.8        76       743        90
VIS    2025250    200200   20.8200  147.9700       9.3        97       708        94
VIS    2025250    200200   20.8300  147.7600      11.8        72       865        91
VIS    2025250    200200   20.8100  147.7400      11.8        75       885        94
VIS    2025250    200200   20.8200  147.7100      12.3        81       902        99
VIS    2025250    200200   20.8300  147.7100      12.4        82       906        98
VIS    2025250    200200   20.8300  147.6800      11.4        83       880        98
VIS    2025250    200200   20.8300  147.6400      11.2        81       843        94
VIS    2025250    200200   20.8200  147.6300      11.4        80       843        92
VIS    2025250    200200   20.8300  147.5700       9.6        92       717        92
VIS    2025250    200200   20.8200  147.5500       9.3        95       708        94
VIS    2025250    200200   20.8100  147.5300       9.5        98       704        95
VIS    2025250    200200   20.8100  147.4900       9.1        96       724        97
VIS    2025250    200200   20.8300  147.4700       9.0        88       733        94
VIS    2025250    200200   20.8300  147.4400       8.9        83       742        93
VIS    2025250    200200   20.8200  147.4200       9.7        81       750        91
VIS    2025250    200200   20.8100  147.4000      10.7        82       790        92
VIS    2025250    200200   20.8300  147.3600      11.8        80       879        98
VIS    2025250    200200   20.8200  147.3500      12.1        82       879        98
VIS    2025250    200200   20.8300  147.3300      10.9        87       906        98
VIS    2025250    200200   20.8100  147.3000       9.5        89       815        91
VIS    2025250    200200   20.8300  147.0000      11.4        77       853        91
VIS    2025250    200200   20.8200  146.9600      13.9        76       882        94
VIS    2025250    200200   20.8300  146.9600      14.1        76       882        94
VIS    2025250    200200   20.8100  146.9100      15.3        72       916        95
VIS    2025250    200200   20.8000  146.9000      15.7        75       916        95
VIS    2025250    200200   20.8100  146.8700      15.7        75       905        93
VIS    2025250    200200   20.8200  146.8500      15.2        74       903        93
VIS    2025250    200200   20.8200  146.8100      15.4        71       898        92
VIS    2025250    200200   20.8100  146.7900      14.7        75       898        93
VIS    2025250    200200   20.8100  146.7800      14.5        74       896        94
VIS    2025250    200200   20.8100  146.7400      15.5        74       896        94
VIS    2025250    200200   20.8100  146.7300      16.0        70       898        92
VIS    2025250    200200   20.8100  146.6800      11.3        95       858        96
VIS    2025250    200200   20.8200  146.6500      11.5        91       819        93
VIS    2025250    200200   20.8100  146.6100      15.0        77       890        95
VIS    2025250    200200   20.8100  146.6000      15.6        76       907        96
VIS    2025250    200200   20.8200  146.5600      17.6        72       916        92
VIS    2025250    200200   20.8000  146.5300      17.5        63       935        90
VIS    2025250    200200   20.8200  146.4900      15.6        70       941        97
VIS    2025250    200200   20.8000  146.4800      16.7        68       948        96
VIS    2025250    200200   20.8000  146.4500      17.0        65       948        94
VIS    2025250    200200   20.8000  146.4200      16.2        68       975        97
VIS    2025250    200200   20.8000  146.3900      16.0        73       979        98
VIS    2025250    200200   20.8000  146.3800      16.2        74       979        98
VIS    2025250    200200   20.8100  146.3500      16.7        72       952        97
VIS    2025250    200200   20.8200  146.3300      16.7        69       949        96
VIS    2025250    200200   20.8000  146.2900      15.6        68       926        92
VIS    2025250    200200   20.8000  146.2600      12.6        74       930        90
VIS    2025250    200200   20.8200  146.2300      13.1        78       930        91
VIS    2025250    200200   20.8000  146.2100      12.8        85       908       100
VIS    2025250    200200   20.8000  146.1800      13.6        86       856        96
VIS    2025250    200200   20.7700  142.7500      11.2       106       760        94
VIS    2025250    200200   20.7800  142.7300      11.0       101       760        90
VIS    2025250    200200   20.7700  142.7000      10.1       108       762        96
VIS    2025250    200200   20.7700  142.6900      11.0       107       763        93
VIS    2025250    200200   20.8700  151.8900       6.3        74       989        99
VIS    2025250    200200   20.8500  151.8600       6.2        79       964       100
VIS    2025250    200200   20.8600  151.8500       6.1        81       977        93
VIS    2025250    200200   20.8600  151.5500       7.2        75       908        92
VIS    2025250    200200   20.8500  151.5200       7.1        67       927        95
VIS    2025250    200200   20.8400  151.4700       7.6        70       905        95
VIS    2025250    200200   20.8500  151.4600       7.3        71       884        93
VIS    2025250    200200   20.8600  151.4200       5.6        65       867        90
VIS    2025250    200200   20.8400  151.3900       5.2        64       890        93
VIS    2025250    200200   20.8400  151.3700       5.9        63       889        95
VIS    2025250    200200   20.8500  151.3200       6.2        62       898        94
VIS    2025250    200200   20.8600  151.3000       5.8        66       913        94
VIS    2025250    200200   20.8400  151.1900       7.1        88       976        90
VIS    2025250    200200   20.8300  149.8600       8.9        74       952        94
VIS    2025250    200200   20.8300  149.8200       8.5        72       940        96
VIS    2025250    200200   20.8300  149.7900       8.6        71       940        97
VIS    2025250    200200   20.8400  149.7600       9.1        72       949        94
VIS    2025250    200200   20.8400  149.7500       9.2        74       949        94
VIS    2025250    200200   20.8100  149.7100       8.3        73       963        95
VIS    2025250    200200   20.8100  149.6900       8.0        73       965        95
VIS    2025250    200200   20.8300  149.3400      10.7        86       920        90
VIS    2025250    200200   20.8200  149.3200      10.5        85       914        92
VIS    2025250    200200   20.8200  149.3000      10.2        86       908        93
VIS    2025250    200200   20.8200  149.2700      10.1        88       901        93
VIS    2025250    200200   20.8100  149.2300      10.4        77       902        93
VIS    2025250    200200   20.8100  149.2100      10.2        72       918        95
VIS    2025250    200200   20.8100  149.1800       9.0        70       882        94
VIS    2025250    200200   20.8100  149.1700       8.8        70       880        95
VIS    2025250    200200   20.8200  149.1400       9.2        73       880        94
VIS    2025250    200200   20.8200  149.1100       9.4        76       876        93
VIS    2025250    200200   20.8100  149.1000       9.3        76       882        95
VIS    2025250    200200   20.8200  149.0600       8.0        74       884        95
VIS    2025250    200200   20.8100  149.0400       8.7        72       884        96
VIS    2025250    200200   20.8200  149.0100       8.6        73       886        97
VIS    2025250    200200   20.8100  148.9800       8.1        65       886        95
VIS    2025250    200200   20.8200  148.9800       8.0        67       891        96
VIS    2025250    200200   20.8200  148.8600      10.2        64       978        92
VIS    2025250    200200   20.8100  148.8400      10.2        70       982        95
VIS    2025250    200200   20.8200  148.8200       9.6        72       969        97
VIS    2025250    200200   20.8100  148.7800       9.2        73       943        99
VIS    2025250    200200   20.8200  148.7500      10.4        74       943        96
VIS    2025250    200200   20.8200  148.7300      10.8        74       956        99
VIS    2025250    200200   20.8100  148.7200      10.7        76       952        99
VIS    2025250    200200   20.8000  148.7000      10.1        77       947        99
VIS    2025250    200200   20.8000  148.6500       9.4        74       978        97
VIS    2025250    200200   20.8200  148.6400      10.0        72       994        99
VIS    2025250    200200   20.8200  148.6200       9.5        67       992        95
VIS    2025250    200200   20.8200  148.5800       8.9        68       961        96
VIS    2025250    200200   20.8000  148.5600       9.2        70       923        99
VIS    2025250    200200   20.8200  148.5500       9.5        70       937        96
VIS    2025250    200200   20.8000  148.5200       9.7        70       923        96
VIS    2025250    200200   20.8000  148.4700       8.6        78       920        98
VIS    2025250    200200   20.8000  148.4700       8.6        77       911        99
VIS    2025250    200200   20.8100  148.4300       9.4        78       892        98
VIS    2025250    200200   20.8000  148.4200       9.5        79       892        98
VIS    2025250    200200   20.8100  148.3800       9.3        74       876        98
VIS    2025250    200200   20.8000  148.3500       9.1        70       881        96
VIS    2025250    200200   20.8000  148.3400       9.4        69       881        96
VIS    2025250    200200   20.8000  148.3100       9.4        76       885        95
VIS    2025250    200200   20.8000  148.2700       8.3        71       873        97
VIS    2025250    200200   20.8200  148.2500       7.8        70       883        96
VIS    2025250    200200   20.8100  148.2300       8.1        67       883        92
VIS    2025250    200200   20.8100  148.2200       8.1        73       883        94
VIS    2025250    200200   20.8100  148.1900       8.2        84       862        96
VIS    2025250    200200   20.7900  148.1600       8.1        80       857        96
VIS    2025250    200200   20.7900  148.1200       9.0        94       851       100
VIS    2025250    200200   20.8000  148.1200       9.2        95       841       100
VIS    2025250    200200   20.8000  148.0700       8.9        89       839        98
VIS    2025250    200200   20.8000  148.0600       8.7        87       815        96
VIS    2025250    200200   20.8100  147.9800       9.2        95       724        95
VIS    2025250    200200   20.8000  147.7600      11.3        77       857        93
VIS    2025250    200200   20.7900  147.7400      11.9        77       872        96
VIS    2025250    200200   20.7900  147.7100      12.1        76       897        98
VIS    2025250    200200   20.8100  147.6700      11.0        79       880        98
VIS    2025250    200200   20.7900  147.6700      10.8        74       867        95
VIS    2025250    200200   20.7900  147.5800      10.8       102       721        94
VIS    2025250    200200   20.7900  147.5600      10.5       100       713        93
VIS    2025250    200200   20.8100  147.5400       9.8        99       706        94
VIS    2025250    200200   20.7900  147.5000      10.3       105       706        93
VIS    2025250    200200   20.8000  147.4900       9.1        97       723        97
VIS    2025250    200200   20.7900  147.4500       8.8        87       727        94
VIS    2025250    200200   20.8100  147.4400       8.8        86       735        94
VIS    2025250    200200   20.8100  147.4000      11.1        82       790        91
VIS    2025250    200200   20.8000  147.3900      11.5        80       807        91
VIS    2025250    200200   20.8000  147.3500      12.7        78       861        94
VIS    2025250    200200   20.8000  147.3400      11.0        78       833        93
VIS    2025250    200200   20.7800  147.3000       9.0        85       788        92
VIS    2025250    200200   20.7800  147.2900       9.7        91       778        93
VIS    2025250    200200   20.7800  147.1700      12.0        85       826        92
VIS    2025250    200200   20.7900  147.1700      12.1        84       826        93
VIS    2025250    200200   20.7800  147.1300      10.5        86       828        95
VIS    2025250    200200   20.7900  147.1100       9.4        82       810        91
VIS    2025250    200200   20.8000  146.9700      13.4        76       855        91
VIS    2025250    200200   20.7900  146.9500      14.9        73       882        91
VIS    2025250    200200   20.7800  146.9300      15.0        74       889        90
VIS    2025250    200200   20.8000  146.9000      15.8        75       918        95
VIS    2025250    200200   20.7800  146.8800      17.2        77       910        92
VIS    2025250    200200   20.7900  146.8500      16.2        80       905        94
VIS    2025250    200200   20.8000  146.8200      15.0        77       898        95
VIS    2025250    200200   20.7800  146.8000      13.7        79       898        98
VIS    2025250    200200   20.8000  146.7900      14.6        74       898        94
VIS    2025250    200200   20.7900  146.7500      14.4        75       898        95
VIS    2025250    200200   20.7900  146.7400      15.3        70       898        93
VIS    2025250    200200   20.7900  146.6800      12.0        98       858        99
VIS    2025250    200200   20.7800  146.6500      12.7        88       871        99
VIS    2025250    200200   20.7800  146.6200      15.2        72       913        96
VIS    2025250    200200   20.7800  146.6000      16.4        69       927        95
VIS    2025250    200200   20.7800  146.5700      16.2        66       930        93
VIS    2025250    200200   20.7800  146.5700      16.5        64       932        93
VIS    2025250    200200   20.7900  146.5000      16.6        68       978        96
VIS    2025250    200200   20.7800  146.4900      16.9        67       964        96
VIS    2025250    200200   20.7900  146.4500      17.1        65       948        94
VIS    2025250    200200   20.7800  146.4400      16.6        67       959        96
VIS    2025250    200200   20.7900  146.4100      16.2        70       975        98
VIS    2025250    200200   20.7800  146.3700      16.4        76       971        98
VIS    2025250    200200   20.7800  146.3700      16.2        77       969        98
VIS    2025250    200200   20.7800  146.3200      15.9        71       929        96
VIS    2025250    200200   20.7800  146.3000      15.2        70       925        96
VIS    2025250    200200   20.7800  146.2800      13.6        74       923        97
VIS    2025250    200200   20.7800  146.2700      12.7        76       930        95
VIS    2025250    200200   20.7700  146.2200      12.4        83       908        98
VIS    2025250    200200   20.7700  146.2000      13.5        80       869        95
VIS    2025250    200200   20.7900  146.1800      13.3        86       856        96
VIS    2025250    200200   20.7500  142.7400      10.2       101       760        92
VIS    2025250    200200   20.7500  142.7200       9.4       102       761        95
VIS    2025250    200200   20.7400  142.7000       9.8       108       765        96
VIS    2025250    200200   20.8400  151.8600       6.1        76       958       100
VIS    2025250    200200   20.8300  151.5000       8.1        65       951        91
VIS    2025250    200200   20.8300  151.4800       7.8        67       905        93
VIS    2025250    200200   20.8400  151.4600       7.4        72       883        92
VIS    2025250    200200   20.8200  151.4300       6.5        72       865        91
VIS    2025250    200200   20.8200  151.4100       5.4        63       864        92
VIS    2025250    200200   20.8300  151.3700       5.7        62       890        94
VIS    2025250    200200   20.8300  151.3700       6.0        61       887        94
VIS    2025250    200200   20.8300  151.1900       6.7        88       976        93
VIS    2025250    200200   20.8000  149.9600       7.8        66       978        90
VIS    2025250    200200   20.8000  149.9500       7.8        67       978        91
VIS    2025250    200200   20.8000  149.7800       8.5        67       947        95
VIS    2025250    200200   20.8100  149.7600       8.8        69       938        96
VIS    2025250    200200   20.8100  149.7500       8.7        70       938        96
VIS    2025250    200200   20.8100  149.7100       8.2        72       963        96
VIS    2025250    200200   20.8000  149.6900       8.1        72       963        96
VIS    2025250    200200   20.8000  149.6700       8.1        74       963        96
VIS    2025250    200200   20.7900  149.3000      10.7        84       908        92
VIS    2025250    200200   20.7800  149.2800      11.0        84       907        90
VIS    2025250    200200   20.7800  149.2300      10.7        79       897        92
VIS    2025250    200200   20.7800  149.1900       9.7        72       903        95
VIS    2025250    200200   20.8000  149.1700       8.9        71       880        95
VIS    2025250    200200   20.8000  149.1700       8.8        71       880        95
VIS    2025250    200200   20.8000  149.1300       9.1        74       886        95
VIS    2025250    200200   20.7900  149.1100       9.0        74       908        96
VIS    2025250    200200   20.7900  149.0800       8.6        77       884        94
VIS    2025250    200200   20.8000  149.0600       8.2        73       881        94
VIS    2025250    200200   20.7900  149.0200       8.9        73       884        96
VIS    2025250    200200   20.7900  149.0100       8.7        72       884        96
VIS    2025250    200200   20.7900  148.9900       8.3        64       885        93
VIS    2025250    200200   20.7800  148.8600       9.3        67       985        98
VIS    2025250    200200   20.7800  148.8200      10.0        70       951        96
VIS    2025250    200200   20.7800  148.8000       9.6        71       943        98
VIS    2025250    200200   20.7900  148.7800       9.3        71       940        99
VIS    2025250    200200   20.7800  148.7400      10.6        74       938        99
VIS    2025250    200200   20.8000  148.7300      10.9        75       936        99
VIS    2025250    200200   20.7800  148.7100      10.0        76       926       100
VIS    2025250    200200   20.7800  148.6700       8.6        77       935        98
VIS    2025250    200200   20.7900  148.6500       9.0        75       947        96
VIS    2025250    200200   20.7800  148.6300       8.8        73       978        95
VIS    2025250    200200   20.7800  148.5900       8.1        64       965        97
VIS    2025250    200200   20.7800  148.5600       8.7        68       913        98
VIS    2025250    200200   20.7800  148.5400       9.4        69       910        98
VIS    2025250    200200   20.7900  148.5300       9.5        69       913        96
VIS    2025250    200200   20.7900  148.5000       9.2        75       920        97
VIS    2025250    200200   20.7700  148.4700       8.9        79       931        93
VIS    2025250    200200   20.7800  148.4600       8.9        78       931        97
VIS    2025250    200200   20.7700  148.4300       9.6        74       893        97
VIS    2025250    200200   20.7800  148.3900       9.6        74       876        98
VIS    2025250    200200   20.7800  148.3600       9.0        71       876        97
VIS    2025250    200200   20.7700  148.3600       8.9        71       879        95
VIS    2025250    200200   20.7800  148.3000       9.8        88       874        93
VIS    2025250    200200   20.7800  148.2700       9.3        63       870        93
VIS    2025250    200200   20.7800  148.2000       8.3        65       862        90
VIS    2025250    200200   20.7800  148.1700       8.3        75       859        93
VIS    2025250    200200   20.7700  148.1500       8.5        83       856        97
VIS    2025250    200200   20.7800  148.1200       8.9        93       848       100
VIS    2025250    200200   20.7700  148.1000       9.0        90       840        99
VIS    2025250    200200   20.7800  148.0700       8.9        85       805        95
VIS    2025250    200200   20.7800  148.0500       8.5        83       779        93
VIS    2025250    200200   20.7800  147.7400      11.8        76       872        96
VIS    2025250    200200   20.7700  147.7300      11.2        75       872        96
VIS    2025250    200200   20.7800  147.7000      11.9        76       897        98
VIS    2025250    200200   20.7700  147.6700      11.0        72       895        94
VIS    2025250    200200   20.7800  147.6000      10.7        93       745        92
VIS    2025250    200200   20.7800  147.5600      10.6       102       712        93
VIS    2025250    200200   20.7800  147.5500      10.6       102       702        92
VIS    2025250    200200   20.7700  147.5000      10.8       104       720        92
VIS    2025250    200200   20.7700  147.4700       9.3        92       725        95
VIS    2025250    200200   20.7800  147.4300      10.2        88       728        92
VIS    2025250    200200   20.7800  147.4200      10.4        85       736        91
VIS    2025250    200200   20.7800  147.3800      11.5        78       792        90
VIS    2025250    200200   20.7600  147.3200      10.5        85       812        95
VIS    2025250    200200   20.7600  147.2900      10.3        91       778        94
VIS    2025250    200200   20.7800  147.1700      12.0        85       849        93
VIS    2025250    200200   20.7600  147.1500      13.3        78       864        96
VIS    2025250    200200   20.7600  147.0600      11.7        85       774        91
VIS    2025250    200200   20.7700  146.9000      16.4        73       919        93
VIS    2025250    200200   20.7700  146.8700      17.2        77       911        93
VIS    2025250    200200   20.7500  146.8300      15.5        74       899        96
VIS    2025250    200200   20.7500  146.8200      14.8        76       898        94
VIS    2025250    200200   20.7700  146.8000      13.9        79       898        97
VIS    2025250    200200   20.7500  146.7600      12.4        77       900        98
VIS    2025250    200200   20.7700  146.7300      13.8        72       907        97
VIS    2025250    200200   20.7600  146.7200      13.0        72       907        97
VIS    2025250    200200   20.7600  146.7000      11.8        90       851        91
VIS    2025250    200200   20.7500  146.6600      12.3        88       858        99
VIS    2025250    200200   20.7600  146.6400      14.4        75       905        96
VIS    2025250    200200   20.7500  146.6100      15.8        65       925        94
VIS    2025250    200200   20.7500  146.6000      15.9        65       929        94
VIS    2025250    200200   20.7700  146.5700      16.0        67       932        94
VIS    2025250    200200   20.7500  146.5400      17.9        59       935        92
VIS    2025250    200200   20.7500  146.4800      16.1        70       975        98
VIS    2025250    200200   20.7500  146.4800      16.1        70       965        98
VIS    2025250    200200   20.7500  146.4400      16.5        72       964        97
VIS    2025250    200200   20.7600  146.4100      15.6        76       970        98
VIS    2025250    200200   20.7500  146.3900      13.3        82       962        97
VIS    2025250    200200   20.7700  146.3800      15.6        79       969        98
VIS    2025250    200200   20.7500  146.3300      15.1        72       926        94
VIS    2025250    200200   20.7700  146.3300      15.6        73       926        97
VIS    2025250    200200   20.7700  146.2900      14.5        74       923        98
VIS    2025250    200200   20.7700  146.2800      14.0        76       923        98
VIS    2025250    200200   20.7500  146.2400      13.6        80       877        97
VIS    2025250    200200   20.7600  146.2100      13.6        80       898        98
VIS    2025250    200200   20.7600  146.2100      13.8        80       869        94
VIS    2025250    200200   20.7300  142.7300      10.3        97       760        91
VIS    2025250    200200   20.7400  142.7100       9.7       104       765        95
VIS    2025250    200200   20.8000  151.8600       6.6        66       918        93
VIS    2025250    200200   20.8100  151.8200       6.5        76       937        98
VIS    2025250    200200   20.8000  151.5300       7.8        70       934        92
VIS    2025250    200200   20.8100  151.5100       8.1        65       934        91
VIS    2025250    200200   20.8100  151.4300       6.6        74       865        91
VIS    2025250    200200   20.8100  151.4100       5.8        71       863        93
VIS    2025250    200200   20.8000  151.3900       5.7        66       863        91
VIS    2025250    200200   20.7800  149.9500       7.9        67       978        90
VIS    2025250    200200   20.7800  149.9500       7.8        68       978        91
VIS    2025250    200200   20.7600  149.7700       8.7        71       950        95
VIS    2025250    200200   20.7900  149.7700       8.6        70       949        96
VIS    2025250    200200   20.7600  149.7200       9.0        73       951        94
VIS    2025250    200200   20.7600  149.7000       9.1        72       948        94
VIS    2025250    200200   20.7600  149.6900       8.9        72       948        95
VIS    2025250    200200   20.7700  149.6600       8.7        73       952        95
VIS    2025250    200200   20.7800  149.6400       8.6        76       958        93
VIS    2025250    200200   20.7800  149.2900      11.1        84       908        90
VIS    2025250    200200   20.7600  149.2200      10.5        78       903        93
VIS    2025250    200200   20.7700  149.1800       9.8        70       903        95
VIS    2025250    200200   20.7700  149.1500       9.2        71       886        95
VIS    2025250    200200   20.7600  149.1400       9.1        73       901        97
VIS    2025250    200200   20.7600  149.1100       8.8        75       901        94
VIS    2025250    200200   20.7700  149.0800       8.5        77       884        95
VIS    2025250    200200   20.7700  149.0700       8.3        76       875        97
VIS    2025250    200200   20.7500  149.0200       8.7        76       885        97
VIS    2025250    200200   20.7600  149.0200       8.7        74       885        97
VIS    2025250    200200   20.7600  148.9900       8.6        65       890        94
VIS    2025250    200200   20.7600  148.9600       8.8        71       911        96
VIS    2025250    200200   20.7700  148.8600       8.9        69       987        98
VIS    2025250    200200   20.7600  148.8200       9.6        70       971        98
VIS    2025250    200200   20.7700  148.8100       9.7        70       951        97
VIS    2025250    200200   20.7500  148.7700       9.2        75       957        99
VIS    2025250    200200   20.7600  148.7500      10.1        75       940        97
VIS    2025250    200200   20.7700  148.7300      10.5        75       938        99
VIS    2025250    200200   20.7500  148.6900       9.4        77       921        99
VIS    2025250    200200   20.7700  148.6800       8.7        77       926        98
VIS    2025250    200200   20.7700  148.6600       8.6        75       937        96
VIS    2025250    200200   20.7500  148.6400       8.3        74       949        92
VIS    2025250    200200   20.7500  148.6100       8.4        73       963        97
VIS    2025250    200200   20.7500  148.5900       8.8        70       937        99
VIS    2025250    200200   20.7700  148.5600       8.7        68       913        98
VIS    2025250    200200   20.7500  148.5400       9.1        63       909        98
VIS    2025250    200200   20.7700  148.5100       9.6        69       920        97
VIS    2025250    200200   20.7600  148.4700       9.4        77       942        97
VIS    2025250    200200   20.7700  148.4600       9.1        77       931        95
VIS    2025250    200200   20.7700  148.4300       9.7        73       893        97
VIS    2025250    200200   20.7500  148.4100      10.2        68       891        95
VIS    2025250    200200   20.7600  148.3700       9.5        69       875        96
VIS    2025250    200200   20.7500  148.3600       9.4        67       875        95
VIS    2025250    200200   20.7600  148.3000      10.6        88       868        97
VIS    2025250    200200   20.7600  148.2800      10.0        72       869        96
VIS    2025250    200200   20.7400  148.2600      10.4        50       883        91
VIS    2025250    200200   20.7600  148.1600       8.6        80       848        95
VIS    2025250    200200   20.7400  148.1500       8.8        92       848        99
VIS    2025250    200200   20.7500  148.1200       9.1        94       848        99
VIS    2025250    200200   20.7500  148.1000       9.0        93       841        99
VIS    2025250    200200   20.7400  148.0800       8.6        89       808        96
VIS    2025250    200200   20.7500  148.0400       7.7        78       736        91
VIS    2025250    200200   20.7400  148.0100       7.9        76       727        90
VIS    2025250    200200   20.7600  147.7200      11.2        76       872        95
VIS    2025250    200200   20.7400  147.7100      11.6        79       885        97
VIS    2025250    200200   20.7500  147.6800      11.3        75       895        92
VIS    2025250    200200   20.7500  147.5800      10.0        93       714        91
VIS    2025250    200200   20.7400  147.5400      10.8       105       704        91
VIS    2025250    200200   20.7600  147.5100      11.1       105       708        90
VIS    2025250    200200   20.7500  147.5000       9.9       101       720        96
VIS    2025250    200200   20.7600  147.4700       9.1        95       725        96
VIS    2025250    200200   20.7400  147.4400      10.3        88       736        96
VIS    2025250    200200   20.7300  147.4200      10.2        86       734        95
VIS    2025250    200200   20.7400  147.4100      10.0        81       734        90
VIS    2025250    200200   20.7300  147.3600       8.5        83       752        93
VIS    2025250    200200   20.7500  147.3200      10.6        85       791        94
VIS    2025250    200200   20.7500  147.3000      10.7        89       778        94
VIS    2025250    200200   20.7300  147.2800      11.0        85       736        92
VIS    2025250    200200   20.7400  147.1700      13.8        76       849        95
VIS    2025250    200200   20.7400  147.1400      13.4        70       864        96
VIS    2025250    200200   20.7500  147.1100      12.4        70       870        94
VIS    2025250    200200   20.7400  147.0700      12.3        83       768        93
VIS    2025250    200200   20.7500  147.0600      12.3        84       771        95
VIS    2025250    200200   20.7500  147.0200      13.2        78       772        92
VIS    2025250    200200   20.7400  146.9900      11.8        82       839        99
VIS    2025250    200200   20.7300  146.9600      13.1        78       885        99
VIS    2025250    200200   20.7300  146.9600      13.4        78       885        98
VIS    2025250    200200   20.7300  146.9300      13.9        78       901        94
VIS    2025250    200200   20.7400  146.9000      15.8        76       913        98
VIS    2025250    200200   20.7400  146.8700      16.0        75       912        98
VIS    2025250    200200   20.7400  146.8500      15.9        73       908        96
VIS    2025250    200200   20.7500  146.8300      15.2        75       899        93
VIS    2025250    200200   20.7400  146.8000      12.8        82       898        99
VIS    2025250    200200   20.7500  146.7700      12.2        78       900        98
VIS    2025250    200200   20.7300  146.7400      12.7        77       894        98
VIS    2025250    200200   20.7500  146.7200      12.0        77       900        98
VIS    2025250    200200   20.7400  146.6900      11.6        88       843        96
VIS    2025250    200200   20.7500  146.6700      11.9        88       851        99
VIS    2025250    200200   20.7300  146.6400      14.2        76       910        98
VIS    2025250    200200   20.7400  146.6200      16.1        66       925        95
VIS    2025250    200200   20.7300  146.6000      15.5        64       937        96
VIS    2025250    200200   20.7500  146.5400      17.9        60       935        92
VIS    2025250    200200   20.7300  146.5300      17.6        63       969        97
VIS    2025250    200200   20.7300  146.5000      16.7        67       979        98
VIS    2025250    200200   20.7300  146.4600      16.1        71       965        99
VIS    2025250    200200   20.7400  146.4400      16.3        72       964        99
VIS    2025250    200200   20.7300  146.4300      16.2        75       965        94
VIS    2025250    200200   20.7400  146.4000      13.4        81       962        93
VIS    2025250    200200   20.7200  146.3700      11.3        82       902        95
VIS    2025250    200200   20.7300  146.3500      13.1        76       907        95
VIS    2025250    200200   20.7400  146.3200      15.5        74       911        95
VIS    2025250    200200   20.7400  146.2900      15.4        76       908        96
VIS    2025250    200200   20.7700  151.8400       6.4        74       897        96
VIS    2025250    200200   20.7700  151.5200       7.5        73       930        96
VIS    2025250    200200   20.7900  151.5100       7.7        70       930        94
VIS    2025250    200200   20.7700  151.4800       6.8        77       865        91
VIS    2025250    200200   20.7600  151.4600       6.3        78       865        92
VIS    2025250    200200   20.7800  151.4200       6.5        72       863        91
VIS    2025250    200200   20.7800  151.3900       6.1        67       863        91
VIS    2025250    200200   20.7700  151.3800       6.1        65       863        90
VIS    2025250    200200   20.7500  149.7700       8.5        72       951        95
VIS    2025250    200200   20.7600  149.7600       8.9        73       950        94
VIS    2025250    200200   20.7600  149.7200       9.2        73       951        93
VIS    2025250    200200   20.7400  149.7100       9.5        75       940        93
VIS    2025250    200200   20.7600  149.6800       8.9        72       944        95
VIS    2025250    200200   20.7500  149.6600       8.8        72       940        95
VIS    2025250    200200   20.7400  149.3500      11.2        84       910        90
VIS    2025250    200200   20.7500  149.2200      10.5        80       894        93
VIS    2025250    200200   20.7500  149.1800      10.1        72       903        94
VIS    2025250    200200   20.7500  149.1600       9.4        71       901        96
VIS    2025250    200200   20.7400  149.1400       8.7        73       901        99
VIS    2025250    200200   20.7500  149.1100       8.7        75       901        94
VIS    2025250    200200   20.7500  149.0900       8.5        76       888        96
VIS    2025250    200200   20.7400  149.0700       8.3        77       862        93
VIS    2025250    200200   20.7300  149.0300       9.2        80       874        99
VIS    2025250    200200   20.7400  149.0200       8.9        79       885        98
VIS    2025250    200200   20.7300  148.9800       9.1        72       911        99
VIS    2025250    200200   20.7300  148.8500       9.5        68       976        97
VIS    2025250    200200   20.7400  148.8000       9.2        70       971        97
VIS    2025250    200200   20.7300  148.7800       9.1        74       968        97
VIS    2025250    200200   20.7300  148.7700       9.1        76       953        97
VIS    2025250    200200   20.7500  148.7300       9.7        76       937        98
VIS    2025250    200200   20.7500  148.7200       9.7        76       928       100
VIS    2025250    200200   20.7400  148.6900       9.2        76       919        98
VIS    2025250    200200   20.7300  148.6700       8.8        74       918        98
VIS    2025250    200200   20.7400  148.6100       8.4        76       963        93
VIS    2025250    200200   20.7400  148.5800       8.9        72       926        99
VIS    2025250    200200   20.7200  148.5700       9.1        70       913        99
VIS    2025250    200200   20.7200  148.4600      10.0        71       951        97
VIS    2025250    200200   20.7400  148.4200       9.7        66       925        96
VIS    2025250    200200   20.7400  148.4100      10.0        65       900        99
VIS    2025250    200200   20.7200  148.3800      10.7        68       877        97
VIS    2025250    200200   20.7400  148.3500       9.6        70       875        96
VIS    2025250    200200   20.7400  148.3400       9.7        74       875        98
VIS    2025250    200200   20.7300  148.3000      11.0        89       866        95
VIS    2025250    200200   20.7400  148.2700      10.1        69       869        97
VIS    2025250    200200   20.7300  148.2700      10.1        64       869        96
VIS    2025250    200200   20.7200  148.2300       9.9        45       907        91
VIS    2025250    200200   20.7400  148.2000       7.9        76       840        93
VIS    2025250    200200   20.7200  148.1800       8.8        93       840        99
VIS    2025250    200200   20.7400  148.1500       9.0        93       848        98
VIS    2025250    200200   20.7200  148.1400       9.5        96       848        98
VIS    2025250    200200   20.7300  148.1100       9.4        97       841        97
VIS    2025250    200200   20.7300  148.0900       8.7        93       810        98
VIS    2025250    200200   20.7300  148.0700       8.0        87       745        97
VIS    2025250    200200   20.7300  148.0200       7.4        77       727        93
VIS    2025250    200200   20.7300  148.0100       7.6        80       728        94
VIS    2025250    200200   20.7300  147.9700       8.3        98       705        96
VIS    2025250    200200   20.7200  147.7400      10.2        78       783        93
VIS    2025250    200200   20.7300  147.7300      11.4        79       825        96
VIS    2025250    200200   20.7200  147.7100      12.3        82       856        97
VIS    2025250    200200   20.7200  147.6800      11.5        86       868        99
VIS    2025250    200200   20.7300  147.6700      11.5        82       868        94
VIS    2025250    200200   20.7100  147.5700       9.5        96       707        98
VIS    2025250    200200   20.7100  147.5600       9.8        99       704        99
VIS    2025250    200200   20.7200  147.5200       9.5        94       703        98
VIS    2025250    200200   20.7200  147.5100       9.3        93       704        98
VIS    2025250    200200   20.7100  147.4700       9.2        95       729        99
VIS    2025250    200200   20.7300  147.4400      10.0        91       739        97
VIS    2025250    200200   20.7200  147.4400      10.1        90       739        97
VIS    2025250    200200   20.7100  147.4100       9.7        88       730        96
VIS    2025250    200200   20.7200  147.3700       8.5        86       734        96
VIS    2025250    200200   20.7100  147.3400       9.5        87       745        96
VIS    2025250    200200   20.7200  147.3400       9.7        87       752        97
VIS    2025250    200200   20.7200  147.2600      11.7        89       736        93
VIS    2025250    200200   20.7100  147.2200      12.3        95       733        94
VIS    2025250    200200   20.7200  147.2000      11.4        89       747        94
VIS    2025250    200200   20.7300  147.1700      13.7        79       841        92
VIS    2025250    200200   20.7300  147.1600      14.2        77       849        93
VIS    2025250    200200   20.7100  147.1200      11.7        74       863        95
VIS    2025250    200200   20.7200  147.1100      12.2        75       863        98
VIS    2025250    200200   20.7200  147.0100      11.8        79       828        97
VIS    2025250    200200   20.7200  146.9800      11.9        80       869        99
VIS    2025250    200200   20.7200  146.9600      13.2        76       885       100
VIS    2025250    200200   20.7200  146.9300      14.0        77       901        98
VIS    2025250    200200   20.7000  146.9100      14.3        73       901        96
VIS    2025250    200200   20.7100  146.8900      14.5        74       912        95
VIS    2025250    200200   20.7000  146.8500      15.7        68       899        95
VIS    2025250    200200   20.7000  146.8400      16.1        69       901        95
VIS    2025250    200200   20.7100  146.8100      14.7        75       910        99
VIS    2025250    200200   20.7200  146.7700      11.7        73       907        98
VIS    2025250    200200   20.7200  146.7700      11.9        72       905        96
VIS    2025250    200200   20.7000  146.7300      14.5        72       843        92
VIS    2025250    200200   20.7200  146.7000      12.9        81       843        97
VIS    2025250    200200   20.7100  146.6800      12.6        80       864        97
VIS    2025250    200200   20.7200  146.6500      13.5        75       916        99
VIS    2025250    200200   20.7200  146.6200      15.8        72       923        97
VIS    2025250    200200   20.7000  146.6100      15.2        75       932        99
VIS    2025250    200200   20.7200  146.5700      15.5        63       942        97
VIS    2025250    200200   20.7100  146.5400      16.7        65       961        97
VIS    2025250    200200   20.7200  146.5400      17.6        64       961        97
VIS    2025250    200200   20.7100  146.5000      16.8        68       976        98
VIS    2025250    200200   20.7200  146.4900      16.5        69       969        99
VIS    2025250    200200   20.7100  146.4700      16.2        72       965        99
VIS    2025250    200200   20.7200  146.4300      15.3        77       962        95
VIS    2025250    200200   20.7200  146.4100      13.5        80       942        92
VIS    2025250    200200   20.7100  146.3900      10.4        83       894        92
VIS    2025250    200200   20.7100  146.3700      10.7        82       888        92
VIS    2025250    200200   20.7100  146.3400      12.4        79       888        91
VIS    2025250    200200   20.7500  151.8500       7.0        76       919        91
VIS    2025250    200200   20.7500  151.8200       6.5        70       901        91
VIS    2025250    200200   20.7400  151.6200       8.7        80       989        90
VIS    2025250    200200   20.7400  151.5700       8.3        72       972        92
VIS    2025250    200200   20.7400  151.5400       7.7        66       924        95
VIS    2025250    200200   20.7600  151.5100       7.3        73       885        93
VIS    2025250    200200   20.7500  151.4500       6.0        79       866        90
VIS    2025250    200200   20.7600  151.4200       6.0        72       864        91
VIS    2025250    200200   20.7600  151.3600       5.9        59       890        94
VIS    2025250    200200   20.7200  149.8200       8.0        70       960        92
VIS    2025250    200200   20.7300  149.7800       8.4        72       941        96
VIS    2025250    200200   20.7200  149.7600       8.4        72       951        94
VIS    2025250    200200   20.7100  149.3300      11.5        77       923        90
VIS    2025250    200200   20.7200  149.2400      11.4        79       888        91
VIS    2025250    200200   20.7100  149.2400      11.5        79       894        93
VIS    2025250    200200   20.7100  149.2000      11.2        78       899        94
VIS    2025250    200200   20.7300  149.1800      10.3        74       910        96
VIS    2025250    200200   20.7200  149.1400       8.5        73       901        99
VIS    2025250    200200   20.7300  149.1300       8.4        72       901        99
VIS    2025250    200200   20.7200  149.1000       8.0        74       857        95
VIS    2025250    200200   20.7000  149.0800       8.8        79       861        99
VIS    2025250    200200   20.7000  149.0400       9.7        80       862        98
VIS    2025250    200200   20.7000  149.0200       9.7        81       888        97
VIS    2025250    200200   20.7000  148.9900       9.5        77       909        95
VIS    2025250    200200   20.7200  148.9700       9.3        75       919        98
VIS    2025250    200200   20.7000  148.8900       8.6        69       989        97
VIS    2025250    200200   20.7000  148.8600       7.9        59       989        97
VIS    2025250    200200   20.7000  148.8500       8.4        59       976        97
VIS    2025250    200200   20.7200  148.8100       9.2        69       971        96
VIS    2025250    200200   20.7100  148.8000       9.4        72       968        93
VIS    2025250    200200   20.7200  148.7800       9.0        74       971        97
VIS    2025250    200200   20.7200  148.7500       9.1        77       931        95
VIS    2025250    200200   20.7200  148.7100       9.3        79       925        97
VIS    2025250    200200   20.7200  148.7100       9.3        79       925        98
VIS    2025250    200200   20.7000  148.5900       9.0        77       961        96
VIS    2025250    200200   20.7100  148.5600       8.9        72       913        99
VIS    2025250    200200   20.7000  148.5400       8.4        66       918        96
VIS    2025250    200200   20.7100  148.4900       9.7        66       958        99
VIS    2025250    200200   20.7200  148.4700      10.0        71       956        99
VIS    2025250    200200   20.7200  148.4600       9.9        71       962        97
VIS    2025250    200200   20.7000  148.4300       9.1        64       960        97
VIS    2025250    200200   20.7200  148.3900      10.3        66       881        97
VIS    2025250    200200   20.7000  148.3700      10.2        69       877        98
VIS    2025250    200200   20.7200  148.3400      10.2        76       867        99
VIS    2025250    200200   20.7100  148.3300      10.1        76       867        99
VIS    2025250    200200   20.7000  148.2800      10.5        76       874        99
VIS    2025250    200200   20.6900  148.2700      10.2        73       876        99
VIS    2025250    200200   20.7000  148.2500       9.5        65       900        98
VIS    2025250    200200   20.7100  148.1800       8.5        91       840        99
VIS    2025250    200200   20.7100  148.1700       9.1        93       841        99
VIS    2025250    200200   20.7100  148.1600       9.3        93       842        98
VIS    2025250    200200   20.7000  148.1200       9.5        96       838        99
VIS    2025250    200200   20.7000  148.1000       9.2        99       822        99
VIS    2025250    200200   20.7000  148.0800       8.9       101       724        99
VIS    2025250    200200   20.7000  148.0500       9.1       100       717        98
VIS    2025250    200200   20.7100  148.0200       7.7        90       731        98
VIS    2025250    200200   20.7100  148.0000       7.8        90       729        98
VIS    2025250    200200   20.6900  147.7800      10.3        81       706        90
VIS    2025250    200200   20.6900  147.7600      10.3        80       734        92
VIS    2025250    200200   20.6900  147.7300      11.6        83       825        92
VIS    2025250    200200   20.6900  147.7300      11.6        83       829        93
VIS    2025250    200200   20.7100  147.6900      11.9        87       868        99
VIS    2025250    200200   20.6900  147.6700      10.6        85       856        98
VIS    2025250    200200   20.7100  147.6500      10.9        87       815        94
VIS    2025250    200200   20.7000  147.6300      10.5        87       808        93
VIS    2025250    200200   20.6900  147.6000       9.7        90       756        93
VIS    2025250    200200   20.7000  147.5600       9.4        97       704        99
VIS    2025250    200200   20.6900  147.5500       9.1        91       702        97
VIS    2025250    200200   20.6900  147.5300       9.3        89       702        96
VIS    2025250    200200   20.7000  147.4900       9.4        90       706        97
VIS    2025250    200200   20.7100  147.4700       9.1        94       725        99
VIS    2025250    200200   20.6900  147.4300       9.2        91       711        93
VIS    2025250    200200   20.7000  147.3800       8.7        87       722        96
VIS    2025250    200200   20.6900  147.3600       8.6        86       722        96
VIS    2025250    200200   20.7000  147.3400       9.7        86       745        96
VIS    2025250    200200   20.6800  147.2400      12.2        90       734        92
VIS    2025250    200200   20.6900  147.2200      11.8        94       736        97
VIS    2025250    200200   20.7000  147.2000      11.2        94       749        97
VIS    2025250    200200   20.6900  147.1100      11.1        83       797        97
VIS    2025250    200200   20.7000  147.0700      12.3        80       794        90
VIS    2025250    200200   20.6900  147.0300      13.0        75       837        94
VIS    2025250    200200   20.6900  147.0100      11.6        82       875        97
VIS    2025250    200200   20.6900  147.0000      11.4        83       874        98
VIS    2025250    200200   20.6800  146.9600      14.5        67       899        96
VIS    2025250    200200   20.6900  146.9400      14.5        71       899        95
VIS    2025250    200200   20.7000  146.9300      14.3        71       901        95
VIS    2025250    200200   20.6900  146.9000      14.5        70       901        92
VIS    2025250    200200   20.7000  146.8600      15.3        68       899        95
VIS    2025250    200200   20.7000  146.8400      16.0        68       907        95
VIS    2025250    200200   20.6800  146.8100      15.7        65       915        94
VIS    2025250    200200   20.6800  146.8000      14.6        68       915        96
VIS    2025250    200200   20.6900  146.7600      13.2        75       866        97
VIS    2025250    200200   20.6800  146.7300      15.3        69       855        92
VIS    2025250    200200   20.6800  146.7200      14.7        68       894        95
VIS    2025250    200200   20.6800  146.7000      14.8        65       939        97
VIS    2025250    200200   20.7000  146.6700      13.3        73       921        97
VIS    2025250    200200   20.6900  146.6400      15.3        71       923        97
VIS    2025250    200200   20.7000  146.6100      15.1        76       927        99
VIS    2025250    200200   20.6900  146.6000      14.8        78       927       100
VIS    2025250    200200   20.6900  146.5800      14.6        75       945       100
VIS    2025250    200200   20.6900  146.5300      17.3        64       975        96
VIS    2025250    200200   20.6800  146.5100      17.3        71       975        97
VIS    2025250    200200   20.6800  146.5000      17.1        71       975        97
VIS    2025250    200200   20.6800  146.4600      16.5        73       949       100
VIS    2025250    200200   20.6900  146.4400      15.8        75       939       100
VIS    2025250    200200   20.6700  146.4200      14.4        77       898        99
VIS    2025250    200200   20.6700  146.4000      13.3        77       875        98
VIS    2025250    200200   20.6800  146.3800      11.7        79       875        95
VIS    2025250    200200   20.7400  151.8500       7.1        76       949        92
VIS    2025250    200200   20.7400  151.8300       6.8        74       919        95
VIS    2025250    200200   20.7200  151.6600       8.1        78       978        91
VIS    2025250    200200   20.7200  151.6500       8.3        78       978        90
VIS    2025250    200200   20.7200  151.5800       8.4        77       969        91
VIS    2025250    200200   20.7300  151.5600       8.2        73       969        93
VIS    2025250    200200   20.7300  151.5400       7.8        67       924        95
VIS    2025250    200200   20.7200  151.4700       6.7        66       885        90
VIS    2025250    200200   20.7000  149.7800       8.1        71       960        92
VIS    2025250    200200   20.7000  149.7400       8.5        70       958        95
VIS    2025250    200200   20.7000  149.3300      11.5        77       923        90
VIS    2025250    200200   20.6800  149.2800      11.9        81       858        91
VIS    2025250    200200   20.6800  149.2500      11.4        81       899        92
VIS    2025250    200200   20.7000  149.2300      11.4        78       894        93
VIS    2025250    200200   20.7000  149.2000      11.3        78       900        93
VIS    2025250    200200   20.6800  149.1900      11.1        79       922        93
VIS    2025250    200200   20.6800  149.1500      10.1        76       904        97
VIS    2025250    200200   20.6900  149.1400       9.5        73       901        99
VIS    2025250    200200   20.6900  149.1200       8.7        74       865        98
VIS    2025250    200200   20.7000  149.0800       8.8        79       861        99
VIS    2025250    200200   20.7000  149.0600       9.2        80       861        98
VIS    2025250    200200   20.6900  149.0300       9.9        79       877        97
VIS    2025250    200200   20.7000  149.0200       9.8        80       888        97
VIS    2025250    200200   20.6900  148.9900       9.8        74       915        97
VIS    2025250    200200   20.6800  148.9600       9.1        70       952        95
VIS    2025250    200200   20.6900  148.9100       9.1        74       974        94
VIS    2025250    200200   20.6900  148.8800       8.2        58       989        95
VIS    2025250    200200   20.6800  148.8500       8.2        56       967        96
VIS    2025250    200200   20.6900  148.8400       8.4        59       968        97
VIS    2025250    200200   20.6800  148.8000       9.7        75       962        95
VIS    2025250    200200   20.7000  148.7700       9.2        76       953        93
VIS    2025250    200200   20.7000  148.7500       9.2        78       922        93
VIS    2025250    200200   20.6800  148.7400       9.3        79       922        93
VIS    2025250    200200   20.6700  148.7000       9.6        80       913        98
VIS    2025250    200200   20.6900  148.6900       9.1        79       916        98
VIS    2025250    200200   20.6800  148.6700       9.1        76       924        96
VIS    2025250    200200   20.6700  148.5900       8.9        75       964        94
VIS    2025250    200200   20.6800  148.5900       9.0        79       964        96
VIS    2025250    200200   20.6800  148.5400       8.7        78       918        96
VIS    2025250    200200   20.6900  148.5400       8.3        74       918        96
VIS    2025250    200200   20.6800  148.4700       9.0        74       975        97
VIS    2025250    200200   20.6800  148.4600       9.2        71       960        99
VIS    2025250    200200   20.6700  148.4300       9.0        63       939        95
VIS    2025250    200200   20.6800  148.4000       8.5        62       907        95
VIS    2025250    200200   20.6800  148.3700       9.7        65       876        97
VIS    2025250    200200   20.6800  148.3500      11.0        65       876        95
VIS    2025250    200200   20.6700  148.3300      11.2        63       877        94
VIS    2025250    200200   20.6800  148.3100      10.5        68       877        97
VIS    2025250    200200   20.6800  148.2800      10.0        72       889        99
VIS    2025250    200200   20.6800  148.2600       9.4        69       902       100
VIS    2025250    200200   20.6800  148.2300       7.9        68       887        92
VIS    2025250    200200   20.6700  148.2100       7.5        82       840        94
VIS    2025250    200200   20.6800  148.1800       8.5        95       840        97
VIS    2025250    200200   20.6700  148.1600       8.3        95       837        97
VIS    2025250    200200   20.6700  148.1400       8.1        88       837        97
VIS    2025250    200200   20.6700  148.1100       8.2        93       773        99
VIS    2025250    200200   20.6700  148.0800       9.1       101       720        98
VIS    2025250    200200   20.6700  148.0500      10.5       100       720        95
VIS    2025250    200200   20.6900  148.0300       9.4        96       728        98
VIS    2025250    200200   20.6800  148.0100       9.6        92       729        96
VIS    2025250    200200   20.6600  147.8100      10.4       100       701        91
VIS    2025250    200200   20.6800  147.7700      10.5        82       734        93
VIS    2025250    200200   20.6800  147.7600      10.6        83       734        93
VIS    2025250    200200   20.6800  147.7000      10.6        76       839        92
VIS    2025250    200200   20.6800  147.6700      10.2        76       856        98
VIS    2025250    200200   20.6800  147.6600      10.5        77       856        96
VIS    2025250    200200   20.6700  147.6300       9.3        81       864        95
VIS    2025250    200200   20.6800  147.5900       9.2        95       728        97
VIS    2025250    200200   20.6700  147.5800       9.1        88       719        94
VIS    2025250    200200   20.6800  147.5600       9.1        89       702        95
VIS    2025250    200200   20.6800  147.5300       9.5        89       702        96
VIS    2025250    200200   20.6800  147.4900      10.7        87       710        94
VIS    2025250    200200   20.6600  147.4100       8.5        85       709        95
VIS    2025250    200200   20.6700  147.4100       8.6        87       709        96
VIS    2025250    200200   20.6600  147.3600       8.9        88       718        97
VIS    2025250    200200   20.6800  147.3400       8.9        85       745        96
VIS    2025250    200200   20.6700  147.3400       9.0        86       745        97
VIS    2025250    200200   20.6600  147.2900      12.1        81       769        93
VIS    2025250    200200   20.6600  147.2400      11.5        88       734        95
VIS    2025250    200200   20.6600  147.2100      10.5        90       736        96
VIS    2025250    200200   20.6800  147.2100      10.9        92       745        96
VIS    2025250    200200   20.6700  147.1700       9.2        96       758        95
VIS    2025250    200200   20.6700  147.1600       9.6        94       758        94
VIS    2025250    200200   20.6600  147.1300      11.3        89       770        98
VIS    2025250    200200   20.6600  147.0900      13.5        79       834        92
VIS    2025250    200200   20.6700  147.0900      12.1        82       834        92
VIS    2025250    200200   20.6700  147.0500      13.2        75       837        94
VIS    2025250    200200   20.6700  147.0300      13.7        74       867        95
VIS    2025250    200200   20.6500  146.9600      15.5        62       902        90
VIS    2025250    200200   20.6500  146.9600      15.5        62       902        92
VIS    2025250    200200   20.6700  146.9300      15.6        66       899        92
VIS    2025250    200200   20.6500  146.9000      15.2        71       901        96
VIS    2025250    200200   20.6700  146.8800      14.1        68       901        91
VIS    2025250    200200   20.6600  146.8600      14.1        63       921        93
VIS    2025250    200200   20.6600  146.8300      15.4        60       924        94
VIS    2025250    200200   20.6500  146.8000      14.5        65       921        95
VIS    2025250    200200   20.6700  146.7800      14.3        70       894        91
VIS    2025250    200200   20.6500  146.7600      14.8        69       894        92
VIS    2025250    200200   20.6500  146.7200      15.8        67       947        98
VIS    2025250    200200   20.6700  146.6900      14.9        65       942        97
VIS    2025250    200200   20.6600  146.6800      15.4        67       942        96
VIS    2025250    200200   20.6500  146.6500      15.6        67       924        96
VIS    2025250    200200   20.6500  146.6300      15.2        65       924        95
VIS    2025250    200200   20.6700  146.6000      14.3        72       924        98
VIS    2025250    200200   20.6600  146.5700      14.8        74       945        99
VIS    2025250    200200   20.6500  146.5600      15.0        74       950       100
VIS    2025250    200200   20.6500  146.5300      15.9        79       975        96
VIS    2025250    200200   20.6600  146.5100      16.7        76       975        97
VIS    2025250    200200   20.6600  146.4700      16.0        74       947        99
VIS    2025250    200200   20.6500  146.4500      15.5        73       929        98
VIS    2025250    200200   20.6500  146.4200      15.6        75       898        97
VIS    2025250    200200   20.6500  146.4100      15.5        75       898        98
VIS    2025250    200200   20.6200  142.6200       9.5       110       851        96
VIS    2025250    200200   20.6300  142.5800       9.5       104       841        91
VIS    2025250    200200   20.7200  151.8300       6.9        75       977        93
VIS    2025250    200200   20.7100  151.6600       8.1        77       978        91
VIS    2025250    200200   20.7100  151.6500       8.2        78       978        91
VIS    2025250    200200   20.6900  151.6200       8.4        77       975        93
VIS    2025250    200200   20.7100  151.5800       8.4        77       969        91
VIS    2025250    200200   20.7100  151.5600       8.1        74       946        94
VIS    2025250    200200   20.7000  151.5300       7.7        71       887        92
VIS    2025250    200200   20.6900  151.4900       7.9        66       909        91
VIS    2025250    200200   20.7100  151.4700       7.0        58       898        91
VIS    2025250    200200   20.6800  149.7900       7.9        70       960        91
VIS    2025250    200200   20.6800  149.3000      11.6        79       913        90
VIS    2025250    200200   20.6700  149.3000      11.5        78       899        92
VIS    2025250    200200   20.6700  149.2500      11.3        81       879        92
VIS    2025250    200200   20.6700  149.2300      10.5        78       901        95
VIS    2025250    200200   20.6600  149.2200      10.3        77       901        96
VIS    2025250    200200   20.6800  149.1800      10.8        79       922        93
VIS    2025250    200200   20.6800  149.1600      10.6        78       922        94
VIS    2025250    200200   20.6700  149.1400       9.9        76       919        97
VIS    2025250    200200   20.6700  149.1200       9.5        76       902        99
VIS    2025250    200200   20.6500  149.0900       9.8        80       893        97
VIS    2025250    200200   20.6600  149.0500      10.4        79       879        96
VIS    2025250    200200   20.6600  149.0400      10.5        78       880        96
VIS    2025250    200200   20.6500  149.0200      10.1        78       888        97
VIS    2025250    200200   20.6600  148.9800       9.4        73       912        99
VIS    2025250    200200   20.6600  148.9700       9.3        75       916        98
VIS    2025250    200200   20.6700  148.8500       8.2        59       983        95
VIS    2025250    200200   20.6700  148.8300       8.9        69       965        96
VIS    2025250    200200   20.6700  148.8100       9.6        79       960        94
VIS    2025250    200200   20.6500  148.7800       9.5        81       938        94
VIS    2025250    200200   20.6700  148.7500       9.2        80       922        93
VIS    2025250    200200   20.6700  148.7400       9.4        80       921        94
VIS    2025250    200200   20.6600  148.7100       9.6        80       916        98
VIS    2025250    200200   20.6600  148.6900       9.4        80       916        98
VIS    2025250    200200   20.6500  148.6500       9.4        73       957        97
VIS    2025250    200200   20.6500  148.6400       9.6        72       957        95
VIS    2025250    200200   20.6500  148.6000      10.5        64       964        91
VIS    2025250    200200   20.6700  148.5900       9.1        76       964        94
VIS    2025250    200200   20.6600  148.5500       9.1        77       918        98
VIS    2025250    200200   20.6700  148.5400       8.8        80       918        96
VIS    2025250    200200   20.6600  148.5000       8.2        81       930        95
VIS    2025250    200200   20.6500  148.4700       8.8        71       939        97
VIS    2025250    200200   20.6500  148.4700       8.9        71       939        96
VIS    2025250    200200   20.6600  148.4400       9.3        69       939        96
VIS    2025250    200200   20.6600  148.4100       9.2        64       902        98
VIS    2025250    200200   20.6600  148.3800       9.1        60       876        95
VIS    2025250    200200   20.6600  148.3500      10.9        62       877        93
VIS    2025250    200200   20.6700  148.3400      11.3        63       877        93
VIS    2025250    200200   20.6400  148.2900       9.8        65       925        99
VIS    2025250    200200   20.6600  148.2800       9.6        67       902        99
VIS    2025250    200200   20.6600  148.2600       8.9        64       902        98
VIS    2025250    200200   20.6500  148.2300       8.3        66       883        93
VIS    2025250    200200   20.6600  148.2100       7.6        82       835        93
VIS    2025250    200200   20.6400  148.1700       8.3        95       835        98
VIS    2025250    200200   20.6500  148.1600       8.2        96       836        98
VIS    2025250    200200   20.6400  148.1300       7.8        86       833        96
VIS    2025250    200200   20.6600  148.1100       8.0        90       773        98
VIS    2025250    200200   20.6500  148.0700       9.4       102       722        98
VIS    2025250    200200   20.6500  148.0400      10.1        93       736        97
VIS    2025250    200200   20.6500  148.0400      10.0        92       736        95
VIS    2025250    200200   20.6600  147.9800       8.1        91       705        96
VIS    2025250    200200   20.6500  147.8100      10.2       101       701        92
VIS    2025250    200200   20.6400  147.7700       9.6        87       718        94
VIS    2025250    200200   20.6400  147.7400       9.4        87       747        97
VIS    2025250    200200   20.6600  147.7200       9.9        85       829        93
VIS    2025250    200200   20.6500  147.6700       9.8        67       866        93
VIS    2025250    200200   20.6500  147.6600      10.1        65       874        95
VIS    2025250    200200   20.6400  147.6300       9.9        70       874        96
VIS    2025250    200200   20.6400  147.6100       9.8        71       864        95
VIS    2025250    200200   20.6600  147.5800       9.4        83       719        93
VIS    2025250    200200   20.6400  147.5000      10.6        85       707        93
VIS    2025250    200200   20.6500  147.4400       7.6        79       708        90
VIS    2025250    200200   20.6500  147.4200       8.2        82       709        94
VIS    2025250    200200   20.6500  147.3900       8.8        85       710        95
VIS    2025250    200200   20.6400  147.3700       9.1        87       718        96
VIS    2025250    200200   20.6500  147.3600       9.0        88       718        97
VIS    2025250    200200   20.6500  147.3400       9.3        89       745        98
VIS    2025250    200200   20.6300  147.2600      10.0        94       733        97
VIS    2025250    200200   20.6500  147.2200      10.2        93       734        97
VIS    2025250    200200   20.6400  147.2100      10.0        96       734        97
VIS    2025250    200200   20.6400  147.1900       9.3        98       745        96
VIS    2025250    200200   20.6500  147.1500       9.0       100       748        93
VIS    2025250    200200   20.6500  147.1400      10.2        94       754        97
VIS    2025250    200200   20.6500  147.0900      13.7        78       834        92
VIS    2025250    200200   20.6500  147.0700      13.1        77       849        92
VIS    2025250    200200   20.6300  147.0400      13.3        74       880        99
VIS    2025250    200200   20.6300  147.0400      13.8        73       895        98
VIS    2025250    200200   20.6300  147.0100      14.4        70       904        98
VIS    2025250    200200   20.6500  146.9600      15.7        61       904        90
VIS    2025250    200200   20.6300  146.9300      16.9        60       906        91
VIS    2025250    200200   20.6500  146.9000      15.4        70       904        96
VIS    2025250    200200   20.6400  146.8700      13.7        70       938        94
VIS    2025250    200200   20.6500  146.8500      14.4        61       924        95
VIS    2025250    200200   20.6400  146.8400      14.8        61       929        96
VIS    2025250    200200   20.6300  146.8100      14.7        65       924        97
VIS    2025250    200200   20.6400  146.7700      14.6        68       919        93
VIS    2025250    200200   20.6500  146.7600      14.7        69       919        94
VIS    2025250    200200   20.6300  146.7300      16.3        69       945        98
VIS    2025250    200200   20.6500  146.7000      15.9        69       950        97
VIS    2025250    200200   20.6400  146.6900      15.9        72       950        99
VIS    2025250    200200   20.6300  146.6400      15.3        68       926        97
VIS    2025250    200200   20.6400  146.6200      14.9        68       924        97
VIS    2025250    200200   20.6400  146.6100      14.8        69       921        97
VIS    2025250    200200   20.6200  146.5800      15.0        75       932       100
VIS    2025250    200200   20.6300  146.5600      15.1        76       944       100
VIS    2025250    200200   20.6300  146.5400      15.4        78       952       100
VIS    2025250    200200   20.6300  146.4900      15.4        78       942       100
VIS    2025250    200200   20.6300  146.4900      15.6        77       942       100
VIS    2025250    200200   20.6300  146.4600      15.5        72       929        97
VIS    2025250    200200   20.6300  146.4400      15.5        71       921        95
VIS    2025250    200200   20.6400  146.4200      15.5        75       898        97
VIS    2025250    200200   20.6400  146.3800      16.0        76       875        96
VIS    2025250    200200   20.6100  142.6300      10.0       111       852        98
VIS    2025250    200200   20.6000  142.6100       9.1       121       835        99
VIS    2025250    200200   20.6100  142.5700       9.4       131       826        96
VIS    2025250    200200   20.6700  151.8300       6.0        79       971        99
VIS    2025250    200200   20.6700  151.6400       8.7        69       970        90
VIS    2025250    200200   20.6700  151.6100       8.4        76       920        92
VIS    2025250    200200   20.6700  151.5900       8.1        73       920        93
VIS    2025250    200200   20.6700  151.5600       7.0        70       937        98
VIS    2025250    200200   20.6700  151.5400       7.0        70       909        98
VIS    2025250    200200   20.6500  149.2800      11.3        77       879        92
VIS    2025250    200200   20.6400  149.2700      11.0        77       903        93
VIS    2025250    200200   20.6300  149.2300      10.6        76       899        96
VIS    2025250    200200   20.6500  149.2000       9.9        75       938        96
VIS    2025250    200200   20.6400  149.1900       9.5        74       938        97
VIS    2025250    200200   20.6400  149.1600       9.9        78       934        95
VIS    2025250    200200   20.6400  149.1400       9.5        78       922        96
VIS    2025250    200200   20.6300  149.1000       9.4        77       921        96
VIS    2025250    200200   20.6500  149.0800      10.0        80       899        96
VIS    2025250    200200   20.6300  149.0500      10.0        80       910        96
VIS    2025250    200200   20.6400  149.0200      10.1        78       904        97
VIS    2025250    200200   20.6300  149.0100      10.1        78       904        97
VIS    2025250    200200   20.6400  148.9700       9.2        76       912        98
VIS    2025250    200200   20.6300  148.9600       9.0        75       908        99
VIS    2025250    200200   20.6500  148.8200       9.5        75       961        94
VIS    2025250    200200   20.6300  148.8100       9.8        76       938        96
VIS    2025250    200200   20.6500  148.7800       9.5        80       938        94
VIS    2025250    200200   20.6400  148.7500       9.4        82       921        96
VIS    2025250    200200   20.6300  148.7200       9.4        83       919        95
VIS    2025250    200200   20.6400  148.7100       9.4        81       919        96
VIS    2025250    200200   20.6400  148.6800       9.0        79       919        96
VIS    2025250    200200   20.6400  148.6400       9.6        73       957        94
VIS    2025250    200200   20.6300  148.5600      10.6        64       906        96
VIS    2025250    200200   20.6300  148.5500       9.8        70       903        99
VIS    2025250    200200   20.6300  148.5200       8.7        79       900        99
VIS    2025250    200200   20.6300  148.5000       8.5        75       913        97
VIS    2025250    200200   20.6400  148.4700       8.8        70       930        97
VIS    2025250    200200   20.6200  148.4600       9.0        75       891        96
VIS    2025250    200200   20.6200  148.4100       9.0        81       891        95
VIS    2025250    200200   20.6300  148.3900       9.5        65       887        94
VIS    2025250    200200   20.6200  148.3700       9.8        66       887        98
VIS    2025250    200200   20.6200  148.3500       9.7        71       897       100
VIS    2025250    200200   20.6300  148.3100      10.1        65       934        98
VIS    2025250    200200   20.6300  148.3000      10.0        64       928        99
VIS    2025250    200200   20.6300  148.2600       9.2        61       909        96
VIS    2025250    200200   20.6400  148.2500       8.7        59       901        90
VIS    2025250    200200   20.6400  148.2300       8.3        65       883        90
VIS    2025250    200200   20.6300  148.2100       8.2        82       835        94
VIS    2025250    200200   20.6400  148.1700       8.3        94       835        98
VIS    2025250    200200   20.6300  148.1400       7.9        90       828        97
VIS    2025250    200200   20.6400  148.1300       7.9        87       828        97
VIS    2025250    200200   20.6300  148.0900       9.0       104       722        98
VIS    2025250    200200   20.6300  148.0700       9.0       101       731        99
VIS    2025250    200200   20.6400  148.0400       9.5        92       745        98
VIS    2025250    200200   20.6400  148.0200       8.8        82       736        90
VIS    2025250    200200   20.6200  147.8900       8.5        98       701        98
VIS    2025250    200200   20.6100  147.8600       8.9       102       706        98
VIS    2025250    200200   20.6300  147.8400       9.1       100       706        97
VIS    2025250    200200   20.6200  147.8200       9.5        99       703        93
VIS    2025250    200200   20.6200  147.7900       9.1        89       703        95
VIS    2025250    200200   20.6300  147.7700       9.4        88       718        95
VIS    2025250    200200   20.6300  147.7500       9.1        88       729        97
VIS    2025250    200200   20.6100  147.7200      10.0        86       747        96
VIS    2025250    200200   20.6200  147.6900      10.9        78       856        95
VIS    2025250    200200   20.6100  147.6600      11.3        68       902        94
VIS    2025250    200200   20.6100  147.6500      11.5        66       893        94
VIS    2025250    200200   20.6200  147.6300      10.9        64       874        93
VIS    2025250    200200   20.6300  147.5000       9.7        87       707        90
VIS    2025250    200200   20.6100  147.4700       7.7        76       704        91
VIS    2025250    200200   20.6100  147.4500       7.3        75       706        91
VIS    2025250    200200   20.6200  147.4200       7.6        75       710        91
VIS    2025250    200200   20.6300  147.3900       8.4        82       712        94
VIS    2025250    200200   20.6300  147.3700       9.1        88       723        97
VIS    2025250    200200   20.6100  147.3400      10.0        88       800        98
VIS    2025250    200200   20.6200  147.3300      10.5        85       783        91
VIS    2025250    200200   20.6100  147.2700       9.5        91       740        97
VIS    2025250    200200   20.6100  147.2400       9.5        95       734        95
VIS    2025250    200200   20.6200  147.2300       9.6        96       734        96
VIS    2025250    200200   20.6100  147.2000       9.9        99       734        94
VIS    2025250    200200   20.6200  147.1600       9.3        99       752        94
VIS    2025250    200200   20.6200  147.1400       9.9        94       758        97
VIS    2025250    200200   20.6100  147.1100      12.9        79       780        90
VIS    2025250    200200   20.6300  147.0900      13.9        75       845        90
VIS    2025250    200200   20.6300  147.0700      13.7        74       849        94
VIS    2025250    200200   20.6200  147.0400      13.9        72       899        97
VIS    2025250    200200   20.6100  147.0100      14.5        68       906        92
VIS    2025250    200200   20.6200  147.0100      14.5        71       906        98
VIS    2025250    200200   20.6100  146.9400      16.1        59       913        92
VIS    2025250    200200   20.6000  146.9200      16.6        59       929        92
VIS    2025250    200200   20.6200  146.9100      17.1        59       918        91
VIS    2025250    200200   20.6000  146.8600      14.5        62       951        96
VIS    2025250    200200   20.6100  146.8400      15.0        64       943        97
VIS    2025250    200200   20.6100  146.8300      14.9        65       943        98
VIS    2025250    200200   20.6100  146.7900      14.6        69       921        97
VIS    2025250    200200   20.6000  146.7800      14.6        70       921        97
VIS    2025250    200200   20.6200  146.7400      16.1        71       927        97
VIS    2025250    200200   20.6200  146.7300      15.9        72       935        99
VIS    2025250    200200   20.6200  146.6900      16.0        71       947        94
VIS    2025250    200200   20.6000  146.6800      16.0        68       939        97
VIS    2025250    200200   20.6200  146.6400      15.5        71       927        98
VIS    2025250    200200   20.6200  146.6200      15.9        75       927        99
VIS    2025250    200200   20.6000  146.6100      16.3        78       932        99
VIS    2025250    200200   20.6100  146.5800      15.0        77       932        99
VIS    2025250    200200   20.6100  146.5500      15.0        77       944       100
VIS    2025250    200200   20.6000  146.5200      15.4        74       942       100
VIS    2025250    200200   20.6100  146.4900      15.5        72       929        98
VIS    2025250    200200   20.6100  146.4800      15.7        70       929        98
VIS    2025250    200200   20.6200  146.4500      15.6        70       927        93
VIS    2025250    200200   20.6200  146.4200      15.3        73       910        93
VIS    2025250    200200   20.5800  142.6100       9.4       124       826        99
VIS    2025250    200200   20.5800  142.6000       9.2       129       826        98
VIS    2025250    200200   20.6500  151.6100       8.3        74       920        93
VIS    2025250    200200   20.6600  151.5900       8.1        72       920        93
VIS    2025250    200200   20.6600  151.5700       7.3        70       913        97
VIS    2025250    200200   20.6400  151.5500       7.5        68       892        94
VIS    2025250    200200   20.6200  149.2500      11.1        75       903        93
VIS    2025250    200200   20.6100  149.2400      11.1        73       911        92
VIS    2025250    200200   20.6100  149.2000      10.1        72       908        97
VIS    2025250    200200   20.6300  149.1900       9.5        74       912        98
VIS    2025250    200200   20.6300  149.1700       9.6        78       921        96
VIS    2025250    200200   20.6300  149.1400       9.3        80       921        96
VIS    2025250    200200   20.6200  149.1000       9.4        76       921        97
VIS    2025250    200200   20.6200  149.0900       9.4        76       921        98
VIS    2025250    200200   20.6000  149.0600       9.5        76       930        97
VIS    2025250    200200   20.6100  149.0300      10.4        79       918        95
VIS    2025250    200200   20.6100  149.0000      10.0        76       901        97
VIS    2025250    200200   20.6000  148.9900       9.9        75       899        97
VIS    2025250    200200   20.6200  148.8500       9.3        70       983        96
VIS    2025250    200200   20.6000  148.8200       9.8        80       977        91
VIS    2025250    200200   20.6100  148.8000       9.9        76       938        96
VIS    2025250    200200   20.6200  148.7700       9.5        79       916        96
VIS    2025250    200200   20.6100  148.7300       9.1        82       913        96
VIS    2025250    200200   20.6000  148.7200       8.8        80       912        96
VIS    2025250    200200   20.6100  148.6900       9.2        80       916        97
VIS    2025250    200200   20.6000  148.6100      10.1        64       994        90
VIS    2025250    200200   20.6000  148.6000      10.4        59       966        90
VIS    2025250    200200   20.6000  148.5600       9.9        63       901        94
VIS    2025250    200200   20.6000  148.5300       8.5        76       887        99
VIS    2025250    200200   20.6000  148.5100       8.3        74       887        99
VIS    2025250    200200   20.6100  148.4800       8.8        69       875        95
VIS    2025250    200200   20.6100  148.4600       9.2        76       891        99
VIS    2025250    200200   20.6000  148.4500       9.4        76       890        99
VIS    2025250    200200   20.6000  148.4300       9.1        83       893        98
VIS    2025250    200200   20.6200  148.4000       8.9        75       887        97
VIS    2025250    200200   20.6100  148.3600       9.8        72       897       100
VIS    2025250    200200   20.6100  148.3500       9.8        72       900       100
VIS    2025250    200200   20.6100  148.3100      10.0        66       943        99
VIS    2025250    200200   20.6100  148.3000      10.0        66       942        99
VIS    2025250    200200   20.6100  148.2600       8.6        66       909        93
VIS    2025250    200200   20.6100  148.2100       8.9        88       835        99
VIS    2025250    200200   20.6000  148.2000       9.1        89       833        99
VIS    2025250    200200   20.6000  148.1800       9.3        87       831        99
VIS    2025250    200200   20.6100  148.1500       8.5        84       830        95
VIS    2025250    200200   20.6100  148.0700       9.2       101       737        99
VIS    2025250    200200   20.6100  148.0500       9.4        96       748        98
VIS    2025250    200200   20.6000  148.0200       9.1        87       754        97
VIS    2025250    200200   20.6100  147.9800       7.6        85       704        95
VIS    2025250    200200   20.6100  147.9600       7.6        92       703        98
VIS    2025250    200200   20.6000  147.9300       7.7        94       703        99
VIS    2025250    200200   20.6000  147.9100       8.4        98       703        98
VIS    2025250    200200   20.5900  147.8800       8.5        99       706        99
VIS    2025250    200200   20.6100  147.8600       9.0       103       708        97
VIS    2025250    200200   20.6000  147.8500       9.1       104       710        96
VIS    2025250    200200   20.6000  147.7900       9.3        89       703        94
VIS    2025250    200200   20.6000  147.7700       8.6        89       707        95
VIS    2025250    200200   20.6100  147.7400       8.6        90       736        98
VIS    2025250    200200   20.6000  147.7000      10.5        79       745        93
VIS    2025250    200200   20.5900  147.6800      10.8        69       843        94
VIS    2025250    200200   20.6000  147.6700      11.3        69       856        91
VIS    2025250    200200   20.5800  147.4800       8.2        82       704        93
VIS    2025250    200200   20.5900  147.4600       8.0        81       706        93
VIS    2025250    200200   20.5900  147.4500       8.0        81       706        92
VIS    2025250    200200   20.6000  147.4200       7.9        77       710        91
VIS    2025250    200200   20.5900  147.3800       9.2        87       723        96
VIS    2025250    200200   20.5900  147.3700       9.7        88       738        97
VIS    2025250    200200   20.5900  147.3400      10.9        85       800        92
VIS    2025250    200200   20.5900  147.3100      10.7        81       807        91
VIS    2025250    200200   20.5800  147.2800       9.5        91       752        96
VIS    2025250    200200   20.5900  147.2600       9.5        94       750        98
VIS    2025250    200200   20.5900  147.2300       9.6        96       737        96
VIS    2025250    200200   20.6000  147.2000       9.8        97       734        93
VIS    2025250    200200   20.6000  147.2000       9.9        97       734        93
VIS    2025250    200200   20.5900  147.1700      10.0        91       757        95
VIS    2025250    200200   20.6000  147.1300      10.8        89       762        97
VIS    2025250    200200   20.5900  147.1000      13.0        77       806        92
VIS    2025250    200200   20.5800  147.0700      13.6        75       871        93
VIS    2025250    200200   20.6000  147.0500      14.5        69       895        97
VIS    2025250    200200   20.5800  147.0200      14.5        67       909        95
VIS    2025250    200200   20.6000  146.9600      14.1        64       913        91
VIS    2025250    200200   20.5900  146.9400      14.5        63       916        96
VIS    2025250    200200   20.5800  146.9200      14.1        66       924        96
VIS    2025250    200200   20.6000  146.8800      15.0        62       966        98
VIS    2025250    200200   20.6000  146.8600      14.5        61       951        95
VIS    2025250    200200   20.5800  146.8300      14.9        65       943        97
VIS    2025250    200200   20.6000  146.8300      14.9        67       936        96
VIS    2025250    200200   20.6000  146.7800      14.7        70       921        97
VIS    2025250    200200   20.6000  146.7700      14.6        73       913        98
VIS    2025250    200200   20.5900  146.7400      15.1        80       919        99
VIS    2025250    200200   20.5800  146.7200      15.4        82       935        99
VIS    2025250    200200   20.6000  146.6800      15.7        70       942        98
VIS    2025250    200200   20.6000  146.6800      15.7        69       934        98
VIS    2025250    200200   20.5900  146.6400      15.8        76       927        98
VIS    2025250    200200   20.6000  146.6200      16.2        77       932        99
VIS    2025250    200200   20.5900  146.6000      16.6        78       932        99
VIS    2025250    200200   20.5800  146.5600      15.8        72       944        99
VIS    2025250    200200   20.5700  146.5400      15.7        75       944       100
VIS    2025250    200200   20.5900  146.5300      15.5        73       942       100
VIS    2025250    200200   20.5900  146.4800      17.3        65       921        90
VIS    2025250    200200   20.5900  146.4600      16.7        68       921        92
VIS    2025250    200200   20.5800  146.4300      16.7        72       907        95
VIS    2025250    200200   20.5500  142.7300      11.5       125       766        98
VIS    2025250    200200   20.5400  142.7200      11.9       123       768        97
VIS    2025250    200200   20.6400  151.6300       8.6        71       931        91
VIS    2025250    200200   20.6300  151.6100       8.2        71       917        92
VIS    2025250    200200   20.6200  151.5800       7.8        71       909        94
VIS    2025250    200200   20.6400  151.5600       7.9        70       892        92
VIS    2025250    200200   20.6300  151.5400       7.9        68       892        92
VIS    2025250    200200   20.6000  149.2500      10.8        69       942        90
VIS    2025250    200200   20.5800  149.2200      10.1        62       942        98
VIS    2025250    200200   20.5800  149.2100      10.1        63       924        98
VIS    2025250    200200   20.5900  149.1800      10.4        77       913        94
VIS    2025250    200200   20.6000  149.1500       9.3        80       921        96
VIS    2025250    200200   20.6000  149.1400       9.1        79       921        97
VIS    2025250    200200   20.6000  149.1100       9.6        70       921        98
VIS    2025250    200200   20.6000  149.0800       9.2        72       930        99
VIS    2025250    200200   20.5900  149.0400       9.8        76       930        96
VIS    2025250    200200   20.5900  149.0400      10.0        75       930        96
VIS    2025250    200200   20.5800  149.0100      10.3        77       910        96
VIS    2025250    200200   20.5800  148.9800       9.2        71       905        99
VIS    2025250    200200   20.6000  148.8200       9.7        80       967        93
VIS    2025250    200200   20.5900  148.8000       9.8        78       940        95
VIS    2025250    200200   20.5900  148.7900       9.9        78       916        96
VIS    2025250    200200   20.5700  148.7400       8.9        81       912        93
VIS    2025250    200200   20.5700  148.7400       8.7        81       912        92
VIS    2025250    200200   20.5900  148.6900       9.3        76       915        99
VIS    2025250    200200   20.5900  148.6800       9.7        74       918        99
VIS    2025250    200200   20.5900  148.6100      10.0        65       994        92
VIS    2025250    200200   20.5900  148.5700       9.5        66       901        98
VIS    2025250    200200   20.5900  148.5600       9.6        65       901        98
VIS    2025250    200200   20.5800  148.5200       8.2        82       867        99
VIS    2025250    200200   20.5900  148.5000       8.3        75       867        99
VIS    2025250    200200   20.5700  148.4600       9.2        70       868        98
VIS    2025250    200200   20.5900  148.4600       9.4        72       870        97
VIS    2025250    200200   20.5800  148.4300       9.3        77       888        99
VIS    2025250    200200   20.5800  148.3900       9.7        76       895       100
VIS    2025250    200200   20.5700  148.3700      10.2        76       895        99
VIS    2025250    200200   20.5700  148.3400      10.4        67       931       100
VIS    2025250    200200   20.5700  148.3200      10.2        66       943       100
VIS    2025250    200200   20.5900  148.2900       9.8        66       943        96
VIS    2025250    200200   20.5800  148.2600       8.4        72       928        93
VIS    2025250    200200   20.5900  148.2500       8.0        77       916        94
VIS    2025250    200200   20.5700  148.2200       8.3        89       836        98
VIS    2025250    200200   20.5900  148.2100       8.7        89       834        99
VIS    2025250    200200   20.5800  148.1800       9.5        87       832        99
VIS    2025250    200200   20.5700  148.1400      10.5       108       834        94
VIS    2025250    200200   20.5700  148.0600      10.1        88       811        99
VIS    2025250    200200   20.5700  148.0400      10.6        81       810        96
VIS    2025250    200200   20.5800  148.0300      10.4        86       805        98
VIS    2025250    200200   20.5800  147.9900       9.7        78       713        90
VIS    2025250    200200   20.5700  147.9800       9.7        78       713        90
VIS    2025250    200200   20.5800  147.9400       7.6        90       712        98
VIS    2025250    200200   20.5800  147.9300       8.0        95       715        99
VIS    2025250    200200   20.5700  147.8900       8.4        98       715        99
VIS    2025250    200200   20.5600  147.8700       8.6        96       714        99
VIS    2025250    200200   20.5700  147.8500       9.2        99       714        97
VIS    2025250    200200   20.5800  147.8300       9.6       103       714        93
VIS    2025250    200200   20.5800  147.7900      10.3        90       709        90
VIS    2025250    200200   20.5600  147.7800       9.6        90       716        93
VIS    2025250    200200   20.5800  147.7500       8.3        92       720        96
VIS    2025250    200200   20.5800  147.7200       9.7        82       744        94
VIS    2025250    200200   20.5800  147.6800      10.6        67       814        90
VIS    2025250    200200   20.5600  147.5700      11.1        80       840        96
VIS    2025250    200200   20.5600  147.5100      10.0        87       708        96
VIS    2025250    200200   20.5700  147.4900       8.7        84       704        94
VIS    2025250    200200   20.5600  147.4600       9.4        92       710        98
VIS    2025250    200200   20.5700  147.4400       9.3        89       718        97
VIS    2025250    200200   20.5600  147.4100       9.7        87       732        96
VIS    2025250    200200   20.5600  147.3900      10.5        87       751        96
VIS    2025250    200200   20.5600  147.3800      10.5        87       751        95
VIS    2025250    200200   20.5800  147.3500      10.5        86       826        96
VIS    2025250    200200   20.5800  147.3300      10.8        85       826        94
VIS    2025250    200200   20.5600  147.2900       9.9        87       755        97
VIS    2025250    200200   20.5600  147.2800       9.6        91       755        99
VIS    2025250    200200   20.5800  147.2400       9.6        96       741        97
VIS    2025250    200200   20.5700  147.2200       9.8        94       741        95
VIS    2025250    200200   20.5600  147.1900      10.1        86       744        94
VIS    2025250    200200   20.5800  147.1700      10.0        88       762        96
VIS    2025250    200200   20.5700  147.1600      10.3        83       773        96
VIS    2025250    200200   20.5600  147.1200      12.4        75       793        92
VIS    2025250    200200   20.5700  147.1000      13.3        74       830        94
VIS    2025250    200200   20.5700  147.0800      13.6        75       855        90
VIS    2025250    200200   20.5600  147.0100      12.8        67       910        97
VIS    2025250    200200   20.5700  146.9900      13.1        62       910        93
VIS    2025250    200200   20.5600  146.9700      13.9        64       916        97
VIS    2025250    200200   20.5700  146.9500      13.3        69       916        98
VIS    2025250    200200   20.5600  146.9300      12.9        75       925        97
VIS    2025250    200200   20.5500  146.8900      14.8        71       954       100
VIS    2025250    200200   20.5500  146.8800      15.0        70       954       100
VIS    2025250    200200   20.5700  146.8500      14.6        64       953        98
VIS    2025250    200200   20.5500  146.8100      14.7        70       936        97
VIS    2025250    200200   20.5700  146.8000      15.0        68       930        98
VIS    2025250    200200   20.5600  146.7800      14.6        69       910        94
VIS    2025250    200200   20.5500  146.7400      14.7        75       919        99
VIS    2025250    200200   20.5600  146.7100      15.2        79       930       100
VIS    2025250    200200   20.5600  146.7100      15.1        77       930       100
VIS    2025250    200200   20.5500  146.6800      15.1        78       927        99
VIS    2025250    200200   20.5600  146.6400      15.4        78       926       100
VIS    2025250    200200   20.5500  146.6200      15.8        77       935       100
VIS    2025250    200200   20.5600  146.6000      17.3        74       938        98
VIS    2025250    200200   20.5600  146.5700      17.0        73       944        99
VIS    2025250    200200   20.5700  146.5400      15.9        76       945       100
VIS    2025250    200200   20.5500  146.5200      16.5        75       952       100
VIS    2025250    200200   20.5500  146.5000      16.7        72       944        99
VIS    2025250    200200   20.5500  146.4600      17.6        66       923        94
VIS    2025250    200200   20.5400  142.7200      12.0       123       768        97
VIS    2025250    200200   20.5200  142.7100      11.8       119       768        97
VIS    2025250    200200   20.6000  151.6600       8.8        75       989        91
VIS    2025250    200200   20.6000  151.6300       8.4        70       954        92
VIS    2025250    200200   20.6100  151.6000       8.2        69       920        92
VIS    2025250    200200   20.6100  151.5900       8.1        70       917        90
VIS    2025250    200200   20.5700  149.2200       9.4        54       948        97
VIS    2025250    200200   20.5600  149.2100       9.7        59       924        98
VIS    2025250    200200   20.5600  149.1700      10.4        75       921        96
VIS    2025250    200200   20.5700  149.1600      10.2        78       913        96
VIS    2025250    200200   20.5600  149.1300      10.0        69       910        98
VIS    2025250    200200   20.5500  149.1100      10.4        69       908        97
VIS    2025250    200200   20.5600  149.0700      10.3        74       912        97
VIS    2025250    200200   20.5700  149.0500      10.0        74       919        97
VIS    2025250    200200   20.5600  149.0400      10.1        72       905        98
VIS    2025250    200200   20.5600  149.0000       9.4        74       901        99
VIS    2025250    200200   20.5500  148.9900       9.1        73       901        99
VIS    2025250    200200   20.5600  148.9500       8.6        66       910        99
VIS    2025250    200200   20.5700  148.9400       8.6        61       938        99
VIS    2025250    200200   20.5600  148.8200       9.5        73       956        97
VIS    2025250    200200   20.5700  148.8200       9.5        76       945        95
VIS    2025250    200200   20.5500  148.7700      10.0        73       918        98
VIS    2025250    200200   20.5600  148.7600       9.5        75       912        98
VIS    2025250    200200   20.5700  148.7400       8.9        80       912        94
VIS    2025250    200200   20.5600  148.6900       9.0        74       909        99
VIS    2025250    200200   20.5700  148.6800       9.4        71       910        99
VIS    2025250    200200   20.5500  148.6400       9.9        60       961        99
VIS    2025250    200200   20.5500  148.6000       8.9        83       995        91
VIS    2025250    200200   20.5600  148.5700       8.8        83       925        96
VIS    2025250    200200   20.5500  148.5400       8.5        91       870        97
VIS    2025250    200200   20.5500  148.5200       8.2        87       857        99
VIS    2025250    200200   20.5500  148.4900       8.3        71       853        97
VIS    2025250    200200   20.5600  148.4700       8.9        71       857        98
VIS    2025250    200200   20.5500  148.4400       9.0        82       869       100
VIS    2025250    200200   20.5600  148.4400       8.9        80       870        99
VIS    2025250    200200   20.5500  148.3900       9.1        82       888        99
VIS    2025250    200200   20.5600  148.3700      10.1        76       895        99
VIS    2025250    200200   20.5600  148.3400      10.5        67       907        98
VIS    2025250    200200   20.5500  148.3200      10.3        60       943        99
VIS    2025250    200200   20.5500  148.3100      10.3        60       943        99
VIS    2025250    200200   20.5600  148.2900       9.5        62       955        99
VIS    2025250    200200   20.5600  148.2400       8.0        84       875        96
VIS    2025250    200200   20.5400  148.2300       8.1        82       861        95
VIS    2025250    200200   20.5600  148.1900       8.9        89       832        99
VIS    2025250    200200   20.5600  148.1700       9.5        92       831       100
VIS    2025250    200200   20.5500  148.1400      10.2       106       835        95
VIS    2025250    200200   20.5500  148.1200      10.8       113       834        91
VIS    2025250    200200   20.5600  148.0800       9.9        96       811       100
VIS    2025250    200200   20.5600  148.0400      10.8        74       810        92
VIS    2025250    200200   20.5600  148.0400      10.9        72       810        90
VIS    2025250    200200   20.5500  147.9700      10.0        80       724        91
VIS    2025250    200200   20.5600  147.9600       9.0        83       721        93
VIS    2025250    200200   20.5400  147.9300       8.9        94       728        96
VIS    2025250    200200   20.5400  147.8900       8.3        99       719       100
VIS    2025250    200200   20.5400  147.8800       8.3        98       726       100
VIS    2025250    200200   20.5400  147.8400       9.8        93       726        96
VIS    2025250    200200   20.5600  147.8400       9.5        96       714        96
VIS    2025250    200200   20.5400  147.7900       9.9        90       720        94
VIS    2025250    200200   20.5500  147.7900       9.8        90       720        94
VIS    2025250    200200   20.5400  147.7400       8.3        93       744        99
VIS    2025250    200200   20.5400  147.7300       8.2        90       744        97
VIS    2025250    200200   20.5400  147.6400       8.5        90       747        96
VIS    2025250    200200   20.5500  147.6300       8.5        91       752        95
VIS    2025250    200200   20.5400  147.5900       8.9        96       790        98
VIS    2025250    200200   20.5600  147.5700      10.6        84       840        96
VIS    2025250    200200   20.5600  147.5600      10.9        85       840        95
VIS    2025250    200200   20.5400  147.4900       9.9        95       708        99
VIS    2025250    200200   20.5300  147.4800       9.8        94       712        98
VIS    2025250    200200   20.5400  147.4600       9.7        93       721        98
VIS    2025250    200200   20.5400  147.4100      10.3        83       751        95
VIS    2025250    200200   20.5300  147.4000      11.1        82       781        95
VIS    2025250    200200   20.5500  147.3700      10.9        85       841        97
VIS    2025250    200200   20.5500  147.3600      10.8        83       854        96
VIS    2025250    200200   20.5400  147.3300      10.2        83       841        95
VIS    2025250    200200   20.5400  147.3000       9.6        86       753        96
VIS    2025250    200200   20.5300  147.2800       9.6        88       753        97
VIS    2025250    200200   20.5500  147.2600       9.6        91       755        98
VIS    2025250    200200   20.5400  147.2300       9.9        93       749        97
VIS    2025250    200200   20.5300  147.2100      10.4        95       748        98
VIS    2025250    200200   20.5500  147.1700      10.6        82       779        96
VIS    2025250    200200   20.5400  147.1600      10.8        82       788        96
VIS    2025250    200200   20.5500  147.1200      12.6        74       815        93
VIS    2025250    200200   20.5400  147.1100      13.2        73       828        92
VIS    2025250    200200   20.5300  147.0800      14.9        72       859        93
VIS    2025250    200200   20.5300  147.0400      13.5        74       913        94
VIS    2025250    200200   20.5300  147.0300      13.1        75       913        93
VIS    2025250    200200   20.5400  147.0100      13.1        71       918        98
VIS    2025250    200200   20.5300  146.9700      15.1        68       924        96
VIS    2025250    200200   20.5300  146.9600      14.2        71       924        96
VIS    2025250    200200   20.5500  146.9200      13.0        76       953        97
VIS    2025250    200200   20.5300  146.9000      18.2        64       932        93
VIS    2025250    200200   20.5300  146.8600      16.9        65       932        95
VIS    2025250    200200   20.5300  146.8600      16.3        66       933        96
VIS    2025250    200200   20.5500  146.8200      14.7        70       941        98
VIS    2025250    200200   20.5400  146.8100      14.6        70       936        99
VIS    2025250    200200   20.5300  146.7900      14.6        68       927        97
VIS    2025250    200200   20.5400  146.7600      14.9        67       910        96
VIS    2025250    200200   20.5500  146.7300      14.9        75       919        99
VIS    2025250    200200   20.5300  146.7000      15.2        68       927        95
VIS    2025250    200200   20.5400  146.6800      15.4        74       929        99
VIS    2025250    200200   20.5300  146.6500      15.3        78       929       100
VIS    2025250    200200   20.5400  146.6300      15.5        79       929       100
VIS    2025250    200200   20.5300  146.5900      16.0        75       950        99
VIS    2025250    200200   20.5300  146.5900      15.4        75       950        98
VIS    2025250    200200   20.5300  146.5600      15.5        74       952        99
VIS    2025250    200200   20.5400  146.5200      16.5        75       950       100
VIS    2025250    200200   20.5400  146.5000      16.5        72       944        99
VIS    2025250    200200   20.5300  146.4900      16.3        67       944        98
VIS    2025250    200200   20.5100  142.7300      12.1       124       757        96
VIS    2025250    200200   20.5100  142.7100      11.9       118       760        96
VIS    2025250    200200   20.5800  151.6600       8.7        75       988        91
VIS    2025250    200200   20.5500  149.4900       6.9        72       989        94
VIS    2025250    200200   20.5500  149.4800       6.7        71       989        93
VIS    2025250    200200   20.5500  149.2200       9.1        49       981        96
VIS    2025250    200200   20.5500  149.2000       9.8        63       924        98
VIS    2025250    200200   20.5300  149.1800       9.8        64       957        98
VIS    2025250    200200   20.5300  149.1400      10.3        74       910        97
VIS    2025250    200200   20.5300  149.1300      10.5        74       908        96
VIS    2025250    200200   20.5500  149.1000      10.6        70       908        97
VIS    2025250    200200   20.5300  149.0900      10.4        73       908        97
VIS    2025250    200200   20.5400  149.0400      10.1        72       905        98
VIS    2025250    200200   20.5300  149.0300       9.8        67       893        98
VIS    2025250    200200   20.5400  148.9900       9.0        72       890        99
VIS    2025250    200200   20.5500  148.9800       8.9        73       901        99
VIS    2025250    200200   20.5300  148.8500       9.5        67       958        98
VIS    2025250    200200   20.5500  148.8300       9.5        72       956        98
VIS    2025250    200200   20.5200  148.8000      10.2        66       922        97
VIS    2025250    200200   20.5300  148.7700      10.2        69       921        97
VIS    2025250    200200   20.5200  148.7600      10.1        69       922        98
VIS    2025250    200200   20.5300  148.7400       9.7        65       921        98
VIS    2025250    200200   20.5200  148.6900       9.5        69       913       100
VIS    2025250    200200   20.5300  148.6800       9.3        70       924        99
VIS    2025250    200200   20.5200  148.6600       9.6        63       942        99
VIS    2025250    200200   20.5400  148.5900       8.6        87       939        90
VIS    2025250    200200   20.5400  148.5700       8.5        91       880        96
VIS    2025250    200200   20.5300  148.5600       8.5        91       870        97
VIS    2025250    200200   20.5400  148.5300       8.4        88       857        99
VIS    2025250    200200   20.5400  148.4900       8.3        72       853        97
VIS    2025250    200200   20.5300  148.4700       9.1        82       862        99
VIS    2025250    200200   20.5300  148.4400       9.2        88       866        98
VIS    2025250    200200   20.5400  148.4300       8.8        89       870        98
VIS    2025250    200200   20.5200  148.4000       8.0        80       878        98
VIS    2025250    200200   20.5400  148.3700       9.9        74       896        93
VIS    2025250    200200   20.5400  148.3500      10.4        64       933        96
VIS    2025250    200200   20.5400  148.3300      10.5        60       943        99
VIS    2025250    200200   20.5200  148.2900       9.4        61       977       100
VIS    2025250    200200   20.5200  148.2800       9.0        63       964        99
VIS    2025250    200200   20.5300  148.2500       7.9        76       909        96
VIS    2025250    200200   20.5400  148.2400       8.0        81       875        94
VIS    2025250    200200   20.5200  148.2000       9.0        86       834        99
VIS    2025250    200200   20.5400  148.1600       9.6        95       831        99
VIS    2025250    200200   20.5400  148.1400       9.8       103       847        95
VIS    2025250    200200   20.5300  148.1000       8.6       106       811        97
VIS    2025250    200200   20.5200  148.0600       9.1        80       811        95
VIS    2025250    200200   20.5200  148.0500      10.2        73       847        95
VIS    2025250    200200   20.5200  148.0100      11.2        71       803        90
VIS    2025250    200200   20.5300  148.0000      11.2        71       785        90
VIS    2025250    200200   20.5300  147.9700      10.1        78       785        94
VIS    2025250    200200   20.5100  147.9600       9.6        81       814        97
VIS    2025250    200200   20.5200  147.9100       9.0        98       719        98
VIS    2025250    200200   20.5300  147.8900       8.5        98       719       100
VIS    2025250    200200   20.5300  147.8800       8.5        97       726       100
VIS    2025250    200200   20.5300  147.8400      10.0        91       726        96
VIS    2025250    200200   20.5300  147.8200      10.1        90       723        95
VIS    2025250    200200   20.5300  147.7900       9.8        91       726        96
VIS    2025250    200200   20.5200  147.7800       9.6        92       727        97
VIS    2025250    200200   20.5300  147.7500       8.7        94       746        99
VIS    2025250    200200   20.5200  147.7100       7.9        93       776        97
VIS    2025250    200200   20.5100  147.7100       7.9        94       776        97
VIS    2025250    200200   20.5200  147.6800       8.4        92       749        98
VIS    2025250    200200   20.5300  147.6500       8.6        88       733        96
VIS    2025250    200200   20.5200  147.6300       8.2        93       723        98
VIS    2025250    200200   20.5100  147.5900       9.1        95       736        99
VIS    2025250    200200   20.5200  147.5700       9.3        93       743        94
VIS    2025250    200200   20.5300  147.5600       9.7        94       802        94
VIS    2025250    200200   20.5100  147.4900      10.0        93       723        98
VIS    2025250    200200   20.5300  147.4800       9.9        93       712        98
VIS    2025250    200200   20.5100  147.4500       9.7        83       750        95
VIS    2025250    200200   20.5100  147.4200      11.8        80       793        94
VIS    2025250    200200   20.5100  147.4000      13.1        82       859        98
VIS    2025250    200200   20.5200  147.3600      11.0        80       880        97
VIS    2025250    200200   20.5200  147.3600      10.8        79       871        97
VIS    2025250    200200   20.5200  147.3300       9.3        79       841        94
VIS    2025250    200200   20.5100  147.3000       9.6        79       751        92
VIS    2025250    200200   20.5200  147.2700       9.9        85       750        95
VIS    2025250    200200   20.5300  147.2500       9.8        90       755        97
VIS    2025250    200200   20.5100  147.2300      10.4        90       753        97
VIS    2025250    200200   20.5200  147.2100      10.5        94       752        98
VIS    2025250    200200   20.5100  147.1800      10.6        94       779        99
VIS    2025250    200200   20.5200  147.1600      11.3        82       843        97
VIS    2025250    200200   20.5200  147.1200      13.1        74       849        93
VIS    2025250    200200   20.5100  147.1000      14.5        72       877        96
VIS    2025250    200200   20.5100  147.0700      15.6        70       885        95
VIS    2025250    200200   20.5100  147.0400      14.5        71       922        97
VIS    2025250    200200   20.5100  147.0300      14.3        71       922        97
VIS    2025250    200200   20.5200  146.9900      15.1        68       922        97
VIS    2025250    200200   20.5200  146.9800      15.4        67       924        96
VIS    2025250    200200   20.5000  146.9500      14.2        68       930        97
VIS    2025250    200200   20.5100  146.9100      14.6        70       938        96
VIS    2025250    200200   20.5200  146.9000      18.2        63       932        92
VIS    2025250    200200   20.5000  146.8700      17.2        62       924        93
VIS    2025250    200200   20.5200  146.8500      16.8        64       932        95
VIS    2025250    200200   20.5200  146.8300      15.9        66       943        98
VIS    2025250    200200   20.5100  146.7900      15.2        69       940        99
VIS    2025250    200200   20.5100  146.7800      15.4        68       929        98
VIS    2025250    200200   20.5100  146.7500      15.6        66       929        96
VIS    2025250    200200   20.5100  146.7200      15.0        67       929        93
VIS    2025250    200200   20.5200  146.7100      15.2        67       927        94
VIS    2025250    200200   20.5100  146.6800      15.5        68       937        97
VIS    2025250    200200   20.5100  146.6500      15.4        75       930        99
VIS    2025250    200200   20.5100  146.6100      15.5        75       935       100
VIS    2025250    200200   20.5100  146.6100      15.5        75       935       100
VIS    2025250    200200   20.5000  146.5200      15.9        65       944        98
VIS    2025250    200200   20.5100  146.5100      15.9        67       945        98
VIS    2025250    200200   20.5200  146.4700      16.4        65       932        95
VIS    2025250    200200   20.5200  146.4600      16.4        65       923        94
VIS    2025250    200200   20.4800  142.7400      12.1       126       737        95
VIS    2025250    200200   20.4700  142.7200      12.3       126       737        93
VIS    2025250    200200   20.4600  142.3400      10.6       119       780        99
VIS    2025250    200200   20.5100  149.4900       7.3        75       956        96
VIS    2025250    200200   20.5100  149.4800       7.4        76       956        95
VIS    2025250    200200   20.5200  149.1800       9.8        63       957        98
VIS    2025250    200200   20.5200  149.1500      10.2        71       913        97
VIS    2025250    200200   20.5200  149.1200      10.6        76       908        96
VIS    2025250    200200   20.5000  149.1000      10.7        77       904        95
VIS    2025250    200200   20.5100  149.0700      10.3        72       909        97
VIS    2025250    200200   20.5200  149.0500      10.0        67       910        98
VIS    2025250    200200   20.5200  149.0300       9.7        65       893        97
VIS    2025250    200200   20.5100  149.0100       9.4        63       886        96
VIS    2025250    200200   20.5200  148.9700       8.6        76       886       100
VIS    2025250    200200   20.5200  148.9600       8.5        77       901        99
VIS    2025250    200200   20.5100  148.8500       9.8        61       956        98
VIS    2025250    200200   20.5000  148.8100       9.7        62       943        98
VIS    2025250    200200   20.5000  148.7900       9.9        67       938        97
VIS    2025250    200200   20.5200  148.7700      10.2        69       922        97
VIS    2025250    200200   20.5100  148.7400       9.9        65       923        98
VIS    2025250    200200   20.5100  148.7300       9.9        63       921        98
VIS    2025250    200200   20.5200  148.6900       9.7        68       913       100
VIS    2025250    200200   20.5200  148.6900       9.7        68       913       100
VIS    2025250    200200   20.5000  148.6400      10.1        57       942        95
VIS    2025250    200200   20.5200  148.6300       9.8        57       961        99
VIS    2025250    200200   20.5000  148.6000       7.7        77       957        95
VIS    2025250    200200   20.5100  148.5800       7.8        83       910        95
VIS    2025250    200200   20.5000  148.5500       7.7        83       861        98
VIS    2025250    200200   20.5000  148.5100       8.4        87       849        99
VIS    2025250    200200   20.5000  148.5100       8.4        87       856        99
VIS    2025250    200200   20.5200  148.4800       8.6        84       861        98
VIS    2025250    200200   20.5200  148.4400       9.2        86       866        99
VIS    2025250    200200   20.5100  148.4100       8.5        68       872        97
VIS    2025250    200200   20.5100  148.4100       8.2        71       875        98
VIS    2025250    200200   20.5000  148.3600       9.6        62       959       100
VIS    2025250    200200   20.4900  148.3500       9.8        59       960        99
VIS    2025250    200200   20.5000  148.3300      10.4        58       960        98
VIS    2025250    200200   20.5000  148.3100      10.1        56       981        98
VIS    2025250    200200   20.5100  148.2800       8.9        64       964        99
VIS    2025250    200200   20.5100  148.2600       8.1        77       894        97
VIS    2025250    200200   20.4900  148.2300       8.5        88       840        98
VIS    2025250    200200   20.5000  148.2100       9.0        85       831        99
VIS    2025250    200200   20.5000  148.1700       8.8        87       833        99
VIS    2025250    200200   20.5000  148.1400       8.6        97       841        95
VIS    2025250    200200   20.5100  148.1200       8.3       101       787        94
VIS    2025250    200200   20.4900  148.0900       7.3        81       770        94
VIS    2025250    200200   20.4900  148.0800       7.6        76       787        93
VIS    2025250    200200   20.5100  148.0500      11.1        70       849        94
VIS    2025250    200200   20.4900  148.0300      10.8        68       849        91
VIS    2025250    200200   20.5000  147.9900      10.0        75       790        93
VIS    2025250    200200   20.5000  147.9600       9.6        77       816        96
VIS    2025250    200200   20.5100  147.9600       9.6        80       814        97
VIS    2025250    200200   20.5000  147.9300       9.8        90       748        97
VIS    2025250    200200   20.5100  147.8900       8.6        95       719        99
VIS    2025250    200200   20.5000  147.8800       8.7        94       719        97
VIS    2025250    200200   20.5000  147.8400       9.1        85       723        94
VIS    2025250    200200   20.4900  147.8300       8.3        81       723        93
VIS    2025250    200200   20.4900  147.8000       8.5        85       723        96
VIS    2025250    200200   20.5100  147.7700       9.5        93       746        99
VIS    2025250    200200   20.5000  147.7600       9.2        93       768        99
VIS    2025250    200200   20.5100  147.7100       7.9        95       776        97
VIS    2025250    200200   20.5000  147.6900       8.4        94       753        99
VIS    2025250    200200   20.4900  147.6600       8.7        93       723        98
VIS    2025250    200200   20.4900  147.6500       9.0        96       709        99
VIS    2025250    200200   20.4900  147.6200       9.6        98       715       100
VIS    2025250    200200   20.5000  147.6100       9.4        96       727        99
VIS    2025250    200200   20.5100  147.5800       9.3        95       732        98
VIS    2025250    200200   20.4900  147.5400       9.2        89       729        95
VIS    2025250    200200   20.5000  147.5300       9.3        90       723        97
VIS    2025250    200200   20.5000  147.5000       9.9        93       723        98
VIS    2025250    200200   20.4900  147.4600       9.4        86       749        97
VIS    2025250    200200   20.5000  147.4600       9.5        84       749        96
VIS    2025250    200200   20.5000  147.4300      11.5        81       793        95
VIS    2025250    200200   20.5000  147.4000      14.0        82       880        97
VIS    2025250    200200   20.4800  147.3800      14.3        82       871        92
VIS    2025250    200200   20.5000  147.2900      10.2        78       758        91
VIS    2025250    200200   20.4800  147.2700      11.2        80       762        92
VIS    2025250    200200   20.4800  147.2400      10.6        84       790        96
VIS    2025250    200200   20.4800  147.2300      10.5        84       798        95
VIS    2025250    200200   20.4900  147.2000      10.0        86       770        96
VIS    2025250    200200   20.5000  147.1500      12.5        75       866        92
VIS    2025250    200200   20.4900  147.1300      12.5        74       899        95
VIS    2025250    200200   20.4800  147.1000      13.0        74       915        99
VIS    2025250    200200   20.4800  147.0700      15.7        72       921        98
VIS    2025250    200200   20.4900  147.0400      15.3        68       929        96
VIS    2025250    200200   20.5000  147.0100      14.9        70       929        97
VIS    2025250    200200   20.4900  147.0100      14.7        71       930        97
VIS    2025250    200200   20.4900  146.9600      14.5        66       930        98
VIS    2025250    200200   20.4900  146.9500      14.3        67       930        96
VIS    2025250    200200   20.5000  146.9200      14.0        70       938        91
VIS    2025250    200200   20.4800  146.8900      17.5        60       918        90
VIS    2025250    200200   20.5000  146.8700      17.3        61       924        92
VIS    2025250    200200   20.5000  146.8400      15.3        67       930        98
VIS    2025250    200200   20.4800  146.8300      13.7        76       930        99
VIS    2025250    200200   20.5000  146.7900      15.4        67       940        98
VIS    2025250    200200   20.4900  146.7600      16.0        64       940        97
VIS    2025250    200200   20.4900  146.7500      16.0        65       930        96
VIS    2025250    200200   20.4900  146.7300      15.8        66       930        95
VIS    2025250    200200   20.5000  146.6900      15.6        68       938        97
VIS    2025250    200200   20.4900  146.6800      15.5        71       939        99
VIS    2025250    200200   20.4800  146.6500      15.6        72       935        99
VIS    2025250    200200   20.4900  146.6200      15.8        72       932        99
VIS    2025250    200200   20.4700  146.6000      16.1        68       940        98
VIS    2025250    200200   20.4900  146.5800      15.3        68       940        97
VIS    2025250    200200   20.4800  146.5400      16.8        63       942        96
VIS    2025250    200200   20.4900  146.5300      16.2        65       944        97
VIS    2025250    200200   20.4700  146.5000      16.3        66       930        96
VIS    2025250    200200   20.4500  142.3900      10.3       109       785        93
VIS    2025250    200200   20.4600  142.3500      10.4       118       783        99
VIS    2025250    200200   20.4500  142.3400      10.4       118       783        99
VIS    2025250    200200   20.5000  149.4900       7.5        76       956        95
VIS    2025250    200200   20.4800  149.4700       8.2        80       947        94
VIS    2025250    200200   20.4900  149.4500       7.9        78       951        94
VIS    2025250    200200   20.4800  149.4200       7.8        80       951        91
VIS    2025250    200200   20.5000  149.1800       9.8        55       967        96
VIS    2025250    200200   20.4800  149.1400       9.8        62       925        98
VIS    2025250    200200   20.4900  149.1200      10.1        73       908        97
VIS    2025250    200200   20.5000  149.0900      10.9        76       906        95
VIS    2025250    200200   20.4800  149.0800      11.1        74       907        95
VIS    2025250    200200   20.4900  149.0500      10.5        71       907        97
VIS    2025250    200200   20.5000  149.0100       9.7        65       886        97
VIS    2025250    200200   20.5000  149.0100       9.7        66       883        96
VIS    2025250    200200   20.4800  148.9700       9.4        73       883        96
VIS    2025250    200200   20.5000  148.8300       9.7        55       958        97
VIS    2025250    200200   20.4900  148.8100       9.5        63       943        98
VIS    2025250    200200   20.4900  148.7800       9.7        69       938        98
VIS    2025250    200200   20.4900  148.7600       9.8        69       925        98
VIS    2025250    200200   20.4800  148.7300       9.7        68       925        99
VIS    2025250    200200   20.4800  148.7300       9.7        69       925        98
VIS    2025250    200200   20.4900  148.7000      10.5        68       927        99
VIS    2025250    200200   20.4900  148.6700      10.5        66       938       100
VIS    2025250    200200   20.4900  148.6400      10.1        58       942        96
VIS    2025250    200200   20.4700  148.6100       8.8        69       951        96
VIS    2025250    200200   20.4800  148.5800       7.4        80       897        95
VIS    2025250    200200   20.4800  148.5600       7.1        79       861        94
VIS    2025250    200200   20.4900  148.5500       7.2        81       861        96
VIS    2025250    200200   20.4900  148.5100       8.2        89       861        98
VIS    2025250    200200   20.4800  148.5000       8.2        91       861        97
VIS    2025250    200200   20.4900  148.4800       9.1        94       863        93
VIS    2025250    200200   20.4700  148.4400       8.3        61       861        94
VIS    2025250    200200   20.4900  148.3700       9.8        55       960        94
VIS    2025250    200200   20.4900  148.3500       9.8        59       960        98
VIS    2025250    200200   20.4800  148.3100       9.5        58       981        99
VIS    2025250    200200   20.4800  148.2800       8.1        75       964        96
VIS    2025250    200200   20.4700  148.2700       8.2        84       901        96
VIS    2025250    200200   20.4800  148.2300       8.4        90       851        98
VIS    2025250    200200   20.4700  148.2200       8.5        89       851        98
VIS    2025250    200200   20.4700  148.1900       8.9        82       831        98
VIS    2025250    200200   20.4900  148.1600       8.6        87       833        99
VIS    2025250    200200   20.4900  148.1500       8.4        96       836        94
VIS    2025250    200200   20.4800  148.1200       8.4       106       823        90
VIS    2025250    200200   20.4900  148.0900       7.4        80       782        93
VIS    2025250    200200   20.4700  148.0500      10.4        68       868        94
VIS    2025250    200200   20.4700  148.0500      10.6        68       892        96
VIS    2025250    200200   20.4600  148.0200      10.5        68       895        95
VIS    2025250    200200   20.4600  147.9800       9.6        76       827        95
VIS    2025250    200200   20.4700  147.9600       9.9        82       816        98
VIS    2025250    200200   20.4700  147.9500      10.5        87       809        98
VIS    2025250    200200   20.4800  147.9100       9.7        96       718        94
VIS    2025250    200200   20.4800  147.9000       9.5        95       706        92
VIS    2025250    200200   20.4600  147.8600       9.3        87       718        94
VIS    2025250    200200   20.4700  147.8400       8.6        85       723        95
VIS    2025250    200200   20.4600  147.8000       7.7        89       738        97
VIS    2025250    200200   20.4700  147.8000       7.9        88       732        98
VIS    2025250    200200   20.4800  147.7700       8.8        90       736        98
VIS    2025250    200200   20.4700  147.7400       8.9        90       804        98
VIS    2025250    200200   20.4600  147.7200       9.0        92       768        99
VIS    2025250    200200   20.4800  147.6900       8.5        94       750        99
VIS    2025250    200200   20.4800  147.6700       8.7        93       733        99
VIS    2025250    200200   20.4800  147.6500       9.1        95       709        99
VIS    2025250    200200   20.4700  147.6200      10.3       101       710        99
VIS    2025250    200200   20.4800  147.5900      10.1        98       717        98
VIS    2025250    200200   20.4600  147.5700      10.0        97       717        96
VIS    2025250    200200   20.4700  147.5400       9.4        90       732        97
VIS    2025250    200200   20.4600  147.5100      10.1        92       740        98
VIS    2025250    200200   20.4800  147.5000      10.0        91       732        98
VIS    2025250    200200   20.4800  147.4500       9.5        86       749        97
VIS    2025250    200200   20.4800  147.4500       9.7        85       749        96
VIS    2025250    200200   20.4600  147.4100      12.6        81       904        97
VIS    2025250    200200   20.4800  147.3900      14.4        82       898        95
VIS    2025250    200200   20.4600  147.3700      13.5        84       807        90
VIS    2025250    200200   20.4800  147.3300      10.9        70       781        90
VIS    2025250    200200   20.4700  147.3000      10.6        78       761        90
VIS    2025250    200200   20.4800  147.2700      11.5        79       762        92
VIS    2025250    200200   20.4700  147.2400      10.8        82       798        95
VIS    2025250    200200   20.4600  147.2100      10.5        71       815        91
VIS    2025250    200200   20.4700  147.1400      13.1        68       919        94
VIS    2025250    200200   20.4600  147.1100      12.2        76       924        98
VIS    2025250    200200   20.4500  147.1000      12.3        80       924        98
VIS    2025250    200200   20.4700  147.0700      15.5        73       921        98
VIS    2025250    200200   20.4700  147.0400      15.0        69       943        94
VIS    2025250    200200   20.4500  147.0100      13.2        70       945        96
VIS    2025250    200200   20.4500  146.9900      13.6        71       949        99
VIS    2025250    200200   20.4500  146.9700      14.6        70       945        99
VIS    2025250    200200   20.4500  146.8800      15.2        69       904        97
VIS    2025250    200200   20.4700  146.8600      15.1        65       916        96
VIS    2025250    200200   20.4600  146.8500      13.6        69       915        97
VIS    2025250    200200   20.4600  146.8200      13.1        79       918       100
VIS    2025250    200200   20.4600  146.7800      15.6        70       933        99
VIS    2025250    200200   20.4700  146.7600      16.0        67       945        98
VIS    2025250    200200   20.4600  146.7400      15.8        69       945        96
VIS    2025250    200200   20.4600  146.7100      15.5        73       935        98
VIS    2025250    200200   20.4700  146.7000      15.4        73       935        98
VIS    2025250    200200   20.4600  146.6600      15.2        74       935       100
VIS    2025250    200200   20.4500  146.6300      16.0        71       935        99
VIS    2025250    200200   20.4500  146.6200      16.2        71       935        98
VIS    2025250    200200   20.4500  146.5900      16.2        69       940        98
VIS    2025250    200200   20.4500  146.5800      16.3        67       942        98
VIS    2025250    200200   20.4700  146.5300      16.9        63       942        95
VIS    2025250    200200   20.4500  146.5100      16.9        65       930        95
VIS    2025250    200200   20.4700  146.4900      16.4        66       930        96
VIS    2025250    200200   20.4100  142.4200      11.4       122       779        97
VIS    2025250    200200   20.4100  142.3900      12.1       103       792        91
VIS    2025250    200200   20.4300  142.3600      10.5       105       789        95
VIS    2025250    200200   20.4600  149.5600       7.3        72       970        93
VIS    2025250    200200   20.4700  149.5300       7.7        75       969        90
VIS    2025250    200200   20.4800  149.5000       7.9        79       963        92
VIS    2025250    200200   20.4800  149.4600       8.2        81       952        93
VIS    2025250    200200   20.4700  149.4500       8.2        82       940        94
VIS    2025250    200200   20.4700  149.4200       7.9        80       950        92
VIS    2025250    200200   20.4700  149.1700      10.1        56       990        94
VIS    2025250    200200   20.4700  149.1400       9.8        63       925        98
VIS    2025250    200200   20.4600  149.1300       9.9        65       948        98
VIS    2025250    200200   20.4600  149.0900      10.4        72       913        97
VIS    2025250    200200   20.4700  149.0700      11.0        73       907        94
VIS    2025250    200200   20.4700  149.0500      10.9        75       907        92
VIS    2025250    200200   20.4500  149.0300      10.8        73       904        94
VIS    2025250    200200   20.4700  148.9900      10.0        70       886        97
VIS    2025250    200200   20.4700  148.9800       9.8        71       886        98
VIS    2025250    200200   20.4700  148.9400       8.3        75       890       100
VIS    2025250    200200   20.4700  148.8600       9.1        56       958        98
VIS    2025250    200200   20.4600  148.8100       9.1        69       955        99
VIS    2025250    200200   20.4500  148.7800       9.4        72       927        98
VIS    2025250    200200   20.4500  148.7700       9.6        72       912        99
VIS    2025250    200200   20.4700  148.7400       9.6        69       925        98
VIS    2025250    200200   20.4700  148.7300       9.6        70       925        99
VIS    2025250    200200   20.4500  148.7000      10.1        74       947        98
VIS    2025250    200200   20.4600  148.6600       9.9        65       945       100
VIS    2025250    200200   20.4600  148.6500       9.8        60       945        99
VIS    2025250    200200   20.4600  148.6300       9.5        61       950        96
VIS    2025250    200200   20.4500  148.5900       8.0        81       916        96
VIS    2025250    200200   20.4500  148.5700       7.9        80       878        97
VIS    2025250    200200   20.4600  148.5300       7.0        79       857        95
VIS    2025250    200200   20.4700  148.5200       7.0        82       857        96
VIS    2025250    200200   20.4700  148.4900       8.2        88       870        97
VIS    2025250    200200   20.4500  148.4800       8.2        73       861        97
VIS    2025250    200200   20.4700  148.4500       8.0        69       861        97
VIS    2025250    200200   20.4500  148.3300      10.4        55       981        96
VIS    2025250    200200   20.4600  148.3200      10.0        55       972        97
VIS    2025250    200200   20.4400  148.2900       9.4        70       971        97
VIS    2025250    200200   20.4600  148.2600       8.7        87       854        98
VIS    2025250    200200   20.4600  148.2300       8.4        90       853        98
VIS    2025250    200200   20.4600  148.2300       8.5        90       851        98
VIS    2025250    200200   20.4500  148.1900       8.9        82       833        98
VIS    2025250    200200   20.4400  148.1600       9.2        87       860        95
VIS    2025250    200200   20.4500  148.0900       8.1        82       785        91
VIS    2025250    200200   20.4600  148.0700      10.0        72       845        95
VIS    2025250    200200   20.4600  148.0500      10.6        70       872        96
VIS    2025250    200200   20.4400  148.0100      11.4        61       918        93
VIS    2025250    200200   20.4600  147.9800       9.9        75       827        94
VIS    2025250    200200   20.4600  147.9800      10.0        78       825        96
VIS    2025250    200200   20.4600  147.9500      10.7        87       809        98
VIS    2025250    200200   20.4500  147.9200      10.4        94       704        90
VIS    2025250    200200   20.4500  147.8600       9.4        88       718        94
VIS    2025250    200200   20.4500  147.8300       8.6        92       723        98
VIS    2025250    200200   20.4400  147.8300       8.5        94       732        99
VIS    2025250    200200   20.4400  147.7900       7.9        91       811        97
VIS    2025250    200200   20.4500  147.7700       8.3        87       775        96
VIS    2025250    200200   20.4400  147.7400       9.0        89       744        98
VIS    2025250    200200   20.4400  147.7100       8.6        93       734        98
VIS    2025250    200200   20.4400  147.6800       8.5        93       726        98
VIS    2025250    200200   20.4400  147.6700       8.6        93       726        98
VIS    2025250    200200   20.4400  147.6400       9.9        96       710        99
VIS    2025250    200200   20.4500  147.6100      11.0       103       715        97
VIS    2025250    200200   20.4400  147.6000      11.0       103       715        98
VIS    2025250    200200   20.4500  147.5600      10.1        97       731        98
VIS    2025250    200200   20.4300  147.5400      10.1        94       736        98
VIS    2025250    200200   20.4300  147.5200       9.7        93       742        99
VIS    2025250    200200   20.4500  147.5000       9.8        90       745        98
VIS    2025250    200200   20.4500  147.4700       9.5        89       765        97
VIS    2025250    200200   20.4400  147.4300      10.7        77       904        95
VIS    2025250    200200   20.4500  147.4100      12.3        80       902        97
VIS    2025250    200200   20.4300  147.3800      11.8        80       805        91
VIS    2025250    200200   20.4500  147.3400      12.0        78       783        91
VIS    2025250    200200   20.4400  147.3300      12.1        79       783        92
VIS    2025250    200200   20.4500  147.2900      11.4        85       762        94
VIS    2025250    200200   20.4400  147.2600      10.6        90       813        99
VIS    2025250    200200   20.4500  147.2400      10.7        79       815        94
VIS    2025250    200200   20.4500  147.2100      11.5        65       851        90
VIS    2025250    200200   20.4300  147.1500      12.3        71       940        90
VIS    2025250    200200   20.4300  147.1100      12.9        78       925        99
VIS    2025250    200200   20.4500  147.1000      12.4        80       924        98
VIS    2025250    200200   20.4300  147.0600      13.7        80       938        98
VIS    2025250    200200   20.4300  147.0500      14.3        75       948        99
VIS    2025250    200200   20.4500  147.0100      12.9        70       948        97
VIS    2025250    200200   20.4500  146.9900      13.3        71       949        99
VIS    2025250    200200   20.4300  146.9100      14.3        71       902        94
VIS    2025250    200200   20.4300  146.9000      14.4        73       902        94
VIS    2025250    200200   20.4500  146.8600      14.9        70       906        97
VIS    2025250    200200   20.4500  146.8400      13.6        70       913        98
VIS    2025250    200200   20.4300  146.8200      14.3        76       913       100
VIS    2025250    200200   20.4500  146.7800      15.3        72       929        99
VIS    2025250    200200   20.4500  146.7800      15.4        69       930        98
VIS    2025250    200200   20.4400  146.7300      16.1        70       926        96
VIS    2025250    200200   20.4400  146.7200      15.9        71       926        96
VIS    2025250    200200   20.4400  146.7000      15.2        75       927        98
VIS    2025250    200200   20.4200  146.6700      14.8        75       930       100
VIS    2025250    200200   20.4300  146.6300      15.6        71       932        98
VIS    2025250    200200   20.4400  146.6300      15.8        72       935        99
VIS    2025250    200200   20.4300  146.5900      16.2        68       947        98
VIS    2025250    200200   20.4300  146.5400      17.2        62       930        93
VIS    2025250    200200   20.4400  146.5100      17.0        65       930        94
VIS    2025250    200200   20.4100  142.6300      12.6       127       733        96
VIS    2025250    200200   20.4100  142.5900      11.8       123       735        98
VIS    2025250    200200   20.4000  142.4700      11.3       112       777        95
VIS    2025250    200200   20.4000  142.4400      11.0       114       781        97
VIS    2025250    200200   20.4000  142.4300      11.2       117       779        98
VIS    2025250    200200   20.4100  142.3900      12.4       103       795        91
VIS    2025250    200200   20.4500  149.5500       7.4        72       970        93
VIS    2025250    200200   20.4300  149.5000       7.9        78       964        92
VIS    2025250    200200   20.4300  149.4900       8.1        80       958        93
VIS    2025250    200200   20.4500  149.4600       8.4        83       940        93
VIS    2025250    200200   20.4400  149.4400       8.5        83       927        94
VIS    2025250    200200   20.4300  149.1600       9.7        60       996        94
VIS    2025250    200200   20.4500  149.1400      10.1        65       948        98
VIS    2025250    200200   20.4300  149.1100      10.9        72       930        95
VIS    2025250    200200   20.4300  149.1000      11.1        75       930        94
VIS    2025250    200200   20.4400  149.0800       9.9        72       915        98
VIS    2025250    200200   20.4500  149.0600      10.4        74       915        94
VIS    2025250    200200   20.4500  149.0100      10.8        72       901        96
VIS    2025250    200200   20.4300  148.9900       9.5        72       901        99
VIS    2025250    200200   20.4300  148.9600       9.3        71       892        99
VIS    2025250    200200   20.4300  148.9300       8.5        67       916        99
VIS    2025250    200200   20.4400  148.9200       8.3        69       919        99
VIS    2025250    200200   20.4200  148.8500       9.2        68       983        98
VIS    2025250    200200   20.4400  148.8100       9.4        69       945        98
VIS    2025250    200200   20.4300  148.8000       9.6        68       927        98
VIS    2025250    200200   20.4200  148.7700       9.7        71       911        98
VIS    2025250    200200   20.4300  148.6800       9.6        72       962        98
VIS    2025250    200200   20.4300  148.6800       9.6        71       962        99
VIS    2025250    200200   20.4400  148.6500       9.2        63       950        98
VIS    2025250    200200   20.4300  148.6300       8.5        72       930        97
VIS    2025250    200200   20.4200  148.5800       8.4        86       896        96
VIS    2025250    200200   20.4300  148.5600       8.4        82       862        99
VIS    2025250    200200   20.4200  148.5300       9.0        84       862        99
VIS    2025250    200200   20.4400  148.5100       8.1        81       874        98
VIS    2025250    200200   20.4200  148.4800       9.0        66       865        93
VIS    2025250    200200   20.4200  148.4600       8.6        63       861        90
VIS    2025250    200200   20.4300  148.4500       8.4        64       861        91
VIS    2025250    200200   20.4200  148.3300      10.7        56       994        91
VIS    2025250    200200   20.4400  148.3200      10.5        56       972        97
VIS    2025250    200200   20.4400  148.3000       9.8        63       971        97
VIS    2025250    200200   20.4200  148.2500      10.1        92       858        95
VIS    2025250    200200   20.4200  148.2500      10.1        92       853        95
VIS    2025250    200200   20.4300  148.2300       9.2        91       838        99
VIS    2025250    200200   20.4300  148.1900       9.0        86       844        99
VIS    2025250    200200   20.4400  148.1600       9.3        88       860        95
VIS    2025250    200200   20.4200  148.1500       9.6        89       860        95
VIS    2025250    200200   20.4400  148.1200       8.3        88       829        95
VIS    2025250    200200   20.4400  148.0900       8.8        83       805        96
VIS    2025250    200200   20.4200  148.0700       9.6        86       805        98
VIS    2025250    200200   20.4200  148.0300      11.0        71       872        96
VIS    2025250    200200   20.4300  148.0100      11.4        62       918        94
VIS    2025250    200200   20.4300  148.0000      11.3        65       918        94
VIS    2025250    200200   20.4300  147.9700      10.8        78       898        97
VIS    2025250    200200   20.4100  147.9400      10.7        89       891        97
VIS    2025250    200200   20.4200  147.9100       9.8        95       704        93
VIS    2025250    200200   20.4300  147.8900       9.6        93       700        93
VIS    2025250    200200   20.4200  147.8500      10.2        88       713        92
VIS    2025250    200200   20.4200  147.8500      10.2        90       713        93
VIS    2025250    200200   20.4300  147.8200       8.4        95       732        99
VIS    2025250    200200   20.4300  147.7900       8.0        89       822        97
VIS    2025250    200200   20.4200  147.7700       8.7        85       822        98
VIS    2025250    200200   20.4300  147.7500       8.9        86       811        97
VIS    2025250    200200   20.4300  147.7000       8.6        92       725        98
VIS    2025250    200200   20.4200  147.7000       8.7        90       725        97
VIS    2025250    200200   20.4300  147.6600       9.1        93       725        98
VIS    2025250    200200   20.4200  147.6400       9.4        92       725        98
VIS    2025250    200200   20.4100  147.6100      11.1        95       715        94
VIS    2025250    200200   20.4100  147.5800      11.3        94       731        95
VIS    2025250    200200   20.4100  147.5600      11.3        93       734        94
VIS    2025250    200200   20.4300  147.5300      10.1        93       739        98
VIS    2025250    200200   20.4300  147.5200       9.7        93       742        99
VIS    2025250    200200   20.4100  147.4800       9.4        89       872        90
VIS    2025250    200200   20.4100  147.4200      11.2        73       892        94
VIS    2025250    200200   20.4300  147.3800      11.4        81       788        93
VIS    2025250    200200   20.4300  147.3700      11.7        81       788        93
VIS    2025250    200200   20.4200  147.3400      11.7        82       788        92
VIS    2025250    200200   20.4100  147.3100      12.5        87       788        95
VIS    2025250    200200   20.4100  147.2800      11.7        95       811        99
VIS    2025250    200200   20.4300  147.2700      10.4        95       813       100
VIS    2025250    200200   20.4100  147.2400       9.6        83       837        97
VIS    2025250    200200   20.4000  147.1700      13.4        63       927        91
VIS    2025250    200200   20.4100  147.1300      14.2        68       913        97
VIS    2025250    200200   20.4100  147.1300      14.4        71       913        98
VIS    2025250    200200   20.4000  147.0900      14.4        75       949       100
VIS    2025250    200200   20.4200  147.0600      13.6        77       948        99
VIS    2025250    200200   20.4200  147.0500      13.5        77       948        99
VIS    2025250    200200   20.4000  147.0100      12.3        75       935        98
VIS    2025250    200200   20.4200  146.9500      12.4        67       922        97
VIS    2025250    200200   20.4000  146.9100      14.7        70       897        95
VIS    2025250    200200   20.4100  146.9000      14.8        71       897        95
VIS    2025250    200200   20.4200  146.8700      15.1        73       889        96
VIS    2025250    200200   20.4200  146.8500      14.2        72       904        97
VIS    2025250    200200   20.4200  146.8100      14.5        82       913        99
VIS    2025250    200200   20.4100  146.7800      14.7        76       923       100
VIS    2025250    200200   20.4000  146.7700      14.8        66       927        97
VIS    2025250    200200   20.4100  146.7500      15.9        67       926        94
VIS    2025250    200200   20.4100  146.7100      16.1        71       926        96
VIS    2025250    200200   20.4000  146.6800      15.3        74       930        99
VIS    2025250    200200   20.4200  146.6700      14.9        74       930        99
VIS    2025250    200200   20.4000  146.6400      15.5        71       930        98
VIS    2025250    200200   20.4100  146.5900      16.3        67       949        98
VIS    2025250    200200   20.4200  146.5600      16.5        64       947        97
VIS    2025250    200200   20.4200  146.5300      17.2        63       926        93
VIS    2025250    200200   20.3800  142.6200      12.1       127       735        96
VIS    2025250    200200   20.3900  142.6000      11.6       127       748        96
VIS    2025250    200200   20.3800  142.5700      10.7       117       748        94
VIS    2025250    200200   20.3700  142.4400      12.2       100       802        90
VIS    2025250    200200   20.3700  142.3400      11.8       101       827        92
VIS    2025250    200200   20.3700  142.3400      11.6       101       827        93
VIS    2025250    200200   20.4100  149.5200       7.8        76       977        90
VIS    2025250    200200   20.4300  149.5000       7.9        78       964        93
VIS    2025250    200200   20.4300  149.4900       8.1        80       958        93
VIS    2025250    200200   20.4100  149.4500       8.6        81       927        95
VIS    2025250    200200   20.4100  149.4400       8.5        80       927        96
VIS    2025250    200200   20.4200  149.4200       8.4        79       937        95
VIS    2025250    200200   20.4200  149.1500       9.8        63       987        97
VIS    2025250    200200   20.4000  149.1200      10.8        69       968        94
VIS    2025250    200200   20.4100  149.0900      11.0        77       933        93
VIS    2025250    200200   20.4000  149.0800      10.4        75       933        95
VIS    2025250    200200   20.4200  149.0600      10.2        77       915        96
VIS    2025250    200200   20.4100  149.0300      10.2        77       906        96
VIS    2025250    200200   20.4200  148.9900       9.6        75       901        99
VIS    2025250    200200   20.4200  148.9800       9.4        73       901        99
VIS    2025250    200200   20.4000  148.9600       8.7        69       893       100
VIS    2025250    200200   20.4200  148.9300       8.4        65       919        98
VIS    2025250    200200   20.4000  148.9100       8.2        68       933        98
VIS    2025250    200200   20.4100  148.8200      10.0        62       965        97
VIS    2025250    200200   20.4100  148.7900       9.8        66       911        98
VIS    2025250    200200   20.4000  148.7800       9.6        66       910        98
VIS    2025250    200200   20.4000  148.7400       9.9        69       918        96
VIS    2025250    200200   20.4100  148.7400       9.8        69       930        95
VIS    2025250    200200   20.4200  148.6700       9.1        74       961        98
VIS    2025250    200200   20.4000  148.6500       8.3        80       937        96
VIS    2025250    200200   20.4100  148.6300       8.4        82       934        95
VIS    2025250    200200   20.4100  148.6100       8.1        84       912        95
VIS    2025250    200200   20.4000  148.5600       8.3        89       876        97
VIS    2025250    200200   20.4100  148.5500       8.8        88       866        99
VIS    2025250    200200   20.4000  148.5300       8.8        87       862        99
VIS    2025250    200200   20.4200  148.4900       9.2        71       871        98
VIS    2025250    200200   20.3900  148.4600       9.1        64       869        95
VIS    2025250    200200   20.3900  148.4600       9.1        64       874        95
VIS    2025250    200200   20.3900  148.4300       9.7        66       890        94
VIS    2025250    200200   20.4000  148.3400       9.5        69       994        93
VIS    2025250    200200   20.4100  148.3000       9.8        66       971        90
VIS    2025250    200200   20.4000  148.2700      10.0        90       866        97
VIS    2025250    200200   20.4000  148.2400      10.0        92       853        99
VIS    2025250    200200   20.3900  148.2100       8.9        92       833        99
VIS    2025250    200200   20.4100  148.1900       9.1        90       835        99
VIS    2025250    200200   20.4100  148.1800       9.2        90       844       100
VIS    2025250    200200   20.3900  148.1500       9.8        92       856        99
VIS    2025250    200200   20.4100  148.1100       9.2        84       834        99
VIS    2025250    200200   20.3900  148.0900       9.1        83       834        98
VIS    2025250    200200   20.4100  148.0700       9.5        87       805        99
VIS    2025250    200200   20.3900  148.0400       9.4        89       801        99
VIS    2025250    200200   20.4100  148.0100      10.6        72       879        97
VIS    2025250    200200   20.4100  148.0000      10.6        71       914        96
VIS    2025250    200200   20.3900  147.9800       9.6        85       914        95
VIS    2025250    200200   20.3900  147.9400      10.6        92       898        97
VIS    2025250    200200   20.4000  147.9300      10.6        90       887        97
VIS    2025250    200200   20.4100  147.9100       9.7        94       713        93
VIS    2025250    200200   20.3900  147.8600      10.8        99       713        93
VIS    2025250    200200   20.3900  147.8500      10.6        96       714        94
VIS    2025250    200200   20.4000  147.8300       9.9        94       719        96
VIS    2025250    200200   20.4000  147.7900       8.3        86       810        98
VIS    2025250    200200   20.4000  147.7700       9.3        82       818        98
VIS    2025250    200200   20.4000  147.7500       9.4        83       818        98
VIS    2025250    200200   20.4000  147.7200       8.8        89       737        97
VIS    2025250    200200   20.3900  147.7000       8.8        91       737        98
VIS    2025250    200200   20.3900  147.6700       8.8        87       728        97
VIS    2025250    200200   20.4000  147.6400       9.5        89       725        97
VIS    2025250    200200   20.3900  147.6300      10.0        89       727        95
VIS    2025250    200200   20.3800  147.5600      11.9        98       745        91
VIS    2025250    200200   20.4000  147.5600      11.7        94       738        96
VIS    2025250    200200   20.4000  147.5200      10.7        94       745        93
VIS    2025250    200200   20.3900  147.5000      10.0        92       843        93
VIS    2025250    200200   20.4000  147.4800       9.5        88       872        90
VIS    2025250    200200   20.3900  147.4400      10.4        73       968        92
VIS    2025250    200200   20.3900  147.4300      10.7        73       889        93
VIS    2025250    200200   20.3800  147.4000      11.4        74       856        98
VIS    2025250    200200   20.3800  147.3700      11.7        73       834        92
VIS    2025250    200200   20.3800  147.3100      13.1        83       800        93
VIS    2025250    200200   20.3800  147.2900      12.3        83       811        96
VIS    2025250    200200   20.3900  147.2700      10.5        90       875        98
VIS    2025250    200200   20.4000  147.2600       9.7        92       827        99
VIS    2025250    200200   20.3800  147.2300       9.7        88       861        97
VIS    2025250    200200   20.3800  147.1900      10.8        80       901        95
VIS    2025250    200200   20.3900  147.1600      13.2        64       906        94
VIS    2025250    200200   20.3800  147.0900      10.0        97       965        90
VIS    2025250    200200   20.3900  147.0300      13.1        77       935        98
VIS    2025250    200200   20.3800  147.0100      13.3        74       929        98
VIS    2025250    200200   20.3900  146.9700      12.5        66       929        93
VIS    2025250    200200   20.3900  146.9500      12.3        67       924        90
VIS    2025250    200200   20.3900  146.9100      14.1        68       904        96
VIS    2025250    200200   20.3900  146.8900      14.6        69       895        92
VIS    2025250    200200   20.3800  146.8800      14.2        68       895        91
VIS    2025250    200200   20.3800  146.8500      12.9        74       901        92
VIS    2025250    200200   20.3800  146.8100      12.1        81       906        99
VIS    2025250    200200   20.3900  146.8000      13.3        82       909        99
VIS    2025250    200200   20.3800  146.7600      13.5        64       921        95
VIS    2025250    200200   20.3900  146.7500      14.6        65       926        96
VIS    2025250    200200   20.3800  146.7200      15.6        66       926        95
VIS    2025250    200200   20.3800  146.6900      16.0        69       929        97
VIS    2025250    200200   20.3700  146.6600      15.6        69       930        98
VIS    2025250    200200   20.3700  146.6600      15.6        68       930        97
VIS    2025250    200200   20.3800  146.6100      16.5        66       949        98
VIS    2025250    200200   20.3800  146.6100      16.4        66       949        98
VIS    2025250    200200   20.3800  146.5800      16.3        65       949        98
VIS    2025250    200200   20.3400  142.6100       9.9       114       730        98
VIS    2025250    200200   20.3400  142.5900      10.8       107       748        94
VIS    2025250    200200   20.3500  142.4500      12.3       100       802        90
VIS    2025250    200200   20.3600  142.3700      12.0       105       821        91
VIS    2025250    200200   20.3500  142.3500      11.8       114       826        96
VIS    2025250    200200   20.4000  149.5200       7.8        76       964        91
VIS    2025250    200200   20.3900  149.4800       8.2        80       911        98
VIS    2025250    200200   20.4000  149.4600       8.5        81       942        93
VIS    2025250    200200   20.4000  149.4300       8.4        77       930        97
VIS    2025250    200200   20.4000  149.4300       8.4        75       937        97
VIS    2025250    200200   20.3800  149.1500       9.4        56       995        97
VIS    2025250    200200   20.4000  149.1200      10.9        69       977        94
VIS    2025250    200200   20.4000  149.0900      10.6        74       939        94
VIS    2025250    200200   20.3900  149.0600      10.1        69       918        95
VIS    2025250    200200   20.3800  149.0500      10.2        69       918        94
VIS    2025250    200200   20.3800  149.0200      10.5        75       902        96
VIS    2025250    200200   20.3800  148.9800       9.2        77       890        99
VIS    2025250    200200   20.4000  148.9600       8.6        70       890        99
VIS    2025250    200200   20.4000  148.9500       8.4        68       893       100
VIS    2025250    200200   20.3900  148.9100       8.2        70       933        99
VIS    2025250    200200   20.3900  148.9000       8.2        71       933        99
VIS    2025250    200200   20.3900  148.8000      10.0        58       945        96
VIS    2025250    200200   20.3900  148.7500       9.9        68       915        97
VIS    2025250    200200   20.3900  148.7500      10.0        68       918        99
VIS    2025250    200200   20.3800  148.7200       9.5        72       968        92
VIS    2025250    200200   20.3800  148.6900       7.6        79       978        92
VIS    2025250    200200   20.3800  148.6600       8.2        76       949        96
VIS    2025250    200200   20.3900  148.6500       8.4        79       937        96
VIS    2025250    200200   20.3800  148.6100       8.3        74       888        99
VIS    2025250    200200   20.3800  148.5900       8.0        78       881        98
VIS    2025250    200200   20.3900  148.5700       8.1        87       881        97
VIS    2025250    200200   20.3900  148.5300       8.7        90       862        99
VIS    2025250    200200   20.3700  148.5200       8.9        86       862        99
VIS    2025250    200200   20.3800  148.4900       9.2        70       871        99
VIS    2025250    200200   20.3900  148.4600       9.2        64       874        96
VIS    2025250    200200   20.3800  148.4400       9.9        66       898        98
VIS    2025250    200200   20.3700  148.3300       9.4        87       963        92
VIS    2025250    200200   20.3800  148.3100       9.9        83       963        94
VIS    2025250    200200   20.3800  148.3000      10.0        84       937        95
VIS    2025250    200200   20.3800  148.2700       9.9        89       858        98
VIS    2025250    200200   20.3800  148.2400       9.4        88       841       100
VIS    2025250    200200   20.3700  148.2100       8.9        89       832        99
VIS    2025250    200200   20.3800  148.1800       9.1        91       834       100
VIS    2025250    200200   20.3700  148.1500       9.3        88       848        99
VIS    2025250    200200   20.3800  148.1500       9.5        88       856       100
VIS    2025250    200200   20.3700  148.1100       8.8        74       892        97
VIS    2025250    200200   20.3900  148.0900       8.9        81       846        98
VIS    2025250    200200   20.3800  148.0700       8.3        91       825        98
VIS    2025250    200200   20.3700  148.0300       9.3        90       740        98
VIS    2025250    200200   20.3700  148.0100       9.2        90       753        99
VIS    2025250    200200   20.3600  147.9900       8.7        91       861        96
VIS    2025250    200200   20.3800  147.9600      10.3        87       898        99
VIS    2025250    200200   20.3800  147.9400      10.7        91       898        97
VIS    2025250    200200   20.3700  147.9200      10.9        88       728        91
VIS    2025250    200200   20.3700  147.8700      11.1        97       711        92
VIS    2025250    200200   20.3800  147.8700      10.9       100       711        92
VIS    2025250    200200   20.3700  147.8300       9.3        92       742        96
VIS    2025250    200200   20.3800  147.8100       8.8        88       753        98
VIS    2025250    200200   20.3700  147.7800       8.8        84       836        99
VIS    2025250    200200   20.3600  147.7500       8.8        87       822        99
VIS    2025250    200200   20.3800  147.7300       9.3        89       742        98
VIS    2025250    200200   20.3700  147.7100       9.2        92       738        99
VIS    2025250    200200   20.3600  147.6700       8.9        87       745        97
VIS    2025250    200200   20.3600  147.6500       8.8        85       745        95
VIS    2025250    200200   20.3600  147.6400       8.8        86       743        95
VIS    2025250    200200   20.3700  147.6000      11.0        83       740        91
VIS    2025250    200200   20.3800  147.5800      11.6        85       741        92
VIS    2025250    200200   20.3800  147.5600      12.2       100       745        92
VIS    2025250    200200   20.3700  147.5200      11.1        96       758        93
VIS    2025250    200200   20.3600  147.4600       9.1        85       952        92
VIS    2025250    200200   20.3600  147.4300       9.9        85       886        97
VIS    2025250    200200   20.3700  147.4000      11.0        76       861        94
VIS    2025250    200200   20.3700  147.3900      11.5        73       856        94
VIS    2025250    200200   20.3600  147.3400      13.2        69       841        90
VIS    2025250    200200   20.3600  147.2700      11.6        71       891        97
VIS    2025250    200200   20.3700  147.2700      10.9        79       891        97
VIS    2025250    200200   20.3600  147.2400      10.1        81       887        97
VIS    2025250    200200   20.3600  147.2100      10.5        80       887        98
VIS    2025250    200200   20.3700  147.1900      10.5        82       906        95
VIS    2025250    200200   20.3700  147.1700      12.0        69       906        97
VIS    2025250    200200   20.3700  147.1200      15.4        70       940        99
VIS    2025250    200200   20.3500  147.0900      10.0        95       965        90
VIS    2025250    200200   20.3700  147.0100      13.2        74       925        96
VIS    2025250    200200   20.3600  147.0000      14.1        69       925        98
VIS    2025250    200200   20.3600  146.9700      13.2        68       925        98
VIS    2025250    200200   20.3600  146.9400      13.2        70       921        98
VIS    2025250    200200   20.3600  146.9200      13.8        70       906        95
VIS    2025250    200200   20.3700  146.8800      14.0        69       895        90
VIS    2025250    200200   20.3600  146.8600      13.7        71       895        93
VIS    2025250    200200   20.3600  146.8300      12.6        78       901        99
VIS    2025250    200200   20.3700  146.8000      12.3        78       907        99
VIS    2025250    200200   20.3700  146.7800      12.8        70       915        96
VIS    2025250    200200   20.3700  146.7600      13.2        65       918        95
VIS    2025250    200200   20.3700  146.7400      14.5        65       927        95
VIS    2025250    200200   20.3500  146.7200      14.7        66       930        96
VIS    2025250    200200   20.3500  146.6800      16.0        66       930        96
VIS    2025250    200200   20.3600  146.6500      15.7        66       932        96
VIS    2025250    200200   20.3600  146.6100      16.3        65       952        98
VIS    2025250    200200   20.3600  146.5800      16.6        65       949        98
VIS    2025250    200200   20.3400  142.5500      13.5       107       785        90
VIS    2025250    200200   20.3100  142.5300      12.9       115       788        92
VIS    2025250    200200   20.3200  142.5000      12.2       105       792        91
VIS    2025250    200200   20.3100  142.3600      11.0       117       811        94
VIS    2025250    200200   20.3100  142.3500      11.7       116       811        92
VIS    2025250    200200   20.3600  149.5100       8.4        80       945        93
VIS    2025250    200200   20.3600  149.4900       8.4        80       924        96
VIS    2025250    200200   20.3800  149.4400       8.4        76       918        98
VIS    2025250    200200   20.3600  149.1000       9.7        56       998        96
VIS    2025250    200200   20.3700  149.0800      10.1        65       965        96
VIS    2025250    200200   20.3700  149.0600      10.1        66       939        95
VIS    2025250    200200   20.3600  149.0400      10.3        69       918        97
VIS    2025250    200200   20.3600  149.0000      10.4        77       902        96
VIS    2025250    200200   20.3600  149.0000      10.3        77       902        97
VIS    2025250    200200   20.3600  148.9700       9.7        76       888        97
VIS    2025250    200200   20.3700  148.9400       8.4        71       886        99
VIS    2025250    200200   20.3700  148.9000       8.3        71       932        99
VIS    2025250    200200   20.3500  148.8800       8.2        66       932       100
VIS    2025250    200200   20.3600  148.8000       9.1        61       945        98
VIS    2025250    200200   20.3700  148.7400       9.7        69       930        99
VIS    2025250    200200   20.3700  148.7200       9.2        73       969        93
VIS    2025250    200200   20.3500  148.6700       7.2        77       949        94
VIS    2025250    200200   20.3600  148.6700       7.6        78       949        95
VIS    2025250    200200   20.3500  148.6300       9.5        71       937        99
VIS    2025250    200200   20.3600  148.6000       8.0        71       887        97
VIS    2025250    200200   20.3500  148.5800       8.0        81       882        97
VIS    2025250    200200   20.3500  148.5500       8.4        88       860        99
VIS    2025250    200200   20.3700  148.5300       8.9        87       860        99
VIS    2025250    200200   20.3500  148.5200       9.1        83       873        99
VIS    2025250    200200   20.3600  148.4700       9.4        65       878        97
VIS    2025250    200200   20.3500  148.4700       9.6        63       895        98
VIS    2025250    200200   20.3500  148.4300      10.6        65       904        98
VIS    2025250    200200   20.3600  148.4200      10.7        66       921        99
VIS    2025250    200200   20.3600  148.4000      10.6        64       960        99
VIS    2025250    200200   20.3500  148.3200       9.2        87       937        94
VIS    2025250    200200   20.3500  148.3200       9.3        87       925        94
VIS    2025250    200200   20.3400  148.2700       9.7        89       873        98
VIS    2025250    200200   20.3500  148.2600       9.6        89       854        99
VIS    2025250    200200   20.3400  148.2400       8.9        92       837        99
VIS    2025250    200200   20.3400  148.2000       9.4        92       830       100
VIS    2025250    200200   20.3400  148.1700       9.1        92       831       100
VIS    2025250    200200   20.3600  148.1500       9.1        89       848        99
VIS    2025250    200200   20.3600  148.1400       9.0        86       852        99
VIS    2025250    200200   20.3400  148.1100       8.3        75       895        96
VIS    2025250    200200   20.3400  148.0800       8.2        85       850        98
VIS    2025250    200200   20.3400  148.0600       8.5        90       814        99
VIS    2025250    200200   20.3600  148.0200       9.1        91       740        98
VIS    2025250    200200   20.3400  148.0000       8.5        93       752        96
VIS    2025250    200200   20.3400  147.9900       8.5        93       752        96
VIS    2025250    200200   20.3400  147.9500      11.3        87       898        98
VIS    2025250    200200   20.3400  147.9300      11.0        90       809        95
VIS    2025250    200200   20.3400  147.9200      10.7        91       756        94
VIS    2025250    200200   20.3600  147.8900      11.1        93       718        91
VIS    2025250    200200   20.3500  147.8500      10.6        92       730        94
VIS    2025250    200200   20.3600  147.8400       9.8        92       742        94
VIS    2025250    200200   20.3400  147.8200       9.8        87       825        99
VIS    2025250    200200   20.3600  147.7800       9.0        86       842        99
VIS    2025250    200200   20.3600  147.7500       9.0        89       822        98
VIS    2025250    200200   20.3600  147.7400       9.2        89       818        99
VIS    2025250    200200   20.3400  147.7000      10.7        87       755        96
VIS    2025250    200200   20.3400  147.6800      10.0        87       747        95
VIS    2025250    200200   20.3600  147.6500       8.8        85       745        95
VIS    2025250    200200   20.3500  147.6400       8.8        87       743        95
VIS    2025250    200200   20.3400  147.6000       9.7        86       741        96
VIS    2025250    200200   20.3400  147.5900      10.0        85       741        96
VIS    2025250    200200   20.3400  147.5600      12.4        86       744        92
VIS    2025250    200200   20.3400  147.5200      11.4        84       880        90
VIS    2025250    200200   20.3300  147.4700       8.9        83       902        95
VIS    2025250    200200   20.3500  147.4500       9.5        87       902        95
VIS    2025250    200200   20.3500  147.4400       9.7        87       886        97
VIS    2025250    200200   20.3500  147.4100      10.0        83       882        98
VIS    2025250    200200   20.3400  147.3900      10.7        71       866        97
VIS    2025250    200200   20.3400  147.3600      12.0        62       862        92
VIS    2025250    200200   20.3300  147.3400      12.7        62       856        92
VIS    2025250    200200   20.3400  147.3000      13.2        67       862        93
VIS    2025250    200200   20.3500  147.2800      12.0        69       891        97
VIS    2025250    200200   20.3300  147.2500      11.0        79       891        98
VIS    2025250    200200   20.3400  147.2200      10.7        77       891        97
VIS    2025250    200200   20.3400  147.2200      10.7        77       895        96
VIS    2025250    200200   20.3300  147.1800      11.3        74       915        97
VIS    2025250    200200   20.3300  147.1500      12.0        75       929        90
VIS    2025250    200200   20.3300  147.1000      10.3        90       941        92
VIS    2025250    200200   20.3400  147.0700       9.5        89       938        91
VIS    2025250    200200   20.3500  147.0300      14.1        69       924        90
VIS    2025250    200200   20.3300  147.0100      15.1        68       918        98
VIS    2025250    200200   20.3500  146.9800      13.7        66       924        98
VIS    2025250    200200   20.3500  146.9500      12.7        65       922        95
VIS    2025250    200200   20.3500  146.9400      12.7        68       922        97
VIS    2025250    200200   20.3300  146.9200      12.6        72       906        98
VIS    2025250    200200   20.3300  146.8700      13.4        71       887        95
VIS    2025250    200200   20.3300  146.8700      13.5        70       887        95
VIS    2025250    200200   20.3300  146.8200      13.9        71       892        94
VIS    2025250    200200   20.3200  146.7500      13.8        68       929        95
VIS    2025250    200200   20.3200  146.7400      13.9        67       934        96
VIS    2025250    200200   20.3300  146.7100      14.6        65       935        97
VIS    2025250    200200   20.3400  146.6400      16.5        63       952        97
VIS    2025250    200200   20.3200  146.6200      17.1        64       937        95
VIS    2025250    200200   20.3000  142.5200      12.7       116       790        92
VIS    2025250    200200   20.3100  142.4400      12.1       104       817        93
VIS    2025250    200200   20.3100  142.4300      12.0       105       817        93
VIS    2025250    200200   20.2900  142.4000      10.6       104       814        95
VIS    2025250    200200   20.2900  142.3800      10.5       111       810        97
VIS    2025250    200200   20.3000  142.3400      11.6       117       811        97
VIS    2025250    200200   20.3300  149.5200       8.4        77       950        93
VIS    2025250    200200   20.3500  149.5100       8.5        80       942        93
VIS    2025250    200200   20.3500  149.4900       8.5        80       924        97
VIS    2025250    200200   20.3400  149.0800      10.4        68       977        94
VIS    2025250    200200   20.3300  149.0600      10.7        72       959        94
VIS    2025250    200200   20.3400  149.0300       9.8        69       929        97
VIS    2025250    200200   20.3400  149.0100       9.9        72       914        98
VIS    2025250    200200   20.3400  149.0000      10.2        74       910        97
VIS    2025250    200200   20.3300  148.9700      10.1        76       902        96
VIS    2025250    200200   20.3500  148.9500       9.2        74       886        96
VIS    2025250    200200   20.3300  148.9100       8.3        70       888        98
VIS    2025250    200200   20.3300  148.8900       8.0        65       916        95
VIS    2025250    200200   20.3400  148.7600       9.5        69       930        96
VIS    2025250    200200   20.3400  148.7500       9.4        69       950        97
VIS    2025250    200200   20.3400  148.7200       8.2        77       982        91
VIS    2025250    200200   20.3400  148.6800       6.7        78       949        93
VIS    2025250    200200   20.3400  148.6700       7.2        77       949        94
VIS    2025250    200200   20.3400  148.6300       9.5        71       949        98
VIS    2025250    200200   20.3400  148.6000       8.4        74       901        98
VIS    2025250    200200   20.3200  148.5900       8.0        87       901        95
VIS    2025250    200200   20.3300  148.5700       7.8        86       882        97
VIS    2025250    200200   20.3200  148.5300       8.3        86       862        98
VIS    2025250    200200   20.3400  148.5200       9.1        82       873       100
VIS    2025250    200200   20.3200  148.4900       8.9        75       900        99
VIS    2025250    200200   20.3200  148.4600       9.3        64       904        98
VIS    2025250    200200   20.3400  148.4300      10.4        65       922        99
VIS    2025250    200200   20.3300  148.4200      10.0        64       945       100
VIS    2025250    200200   20.3200  148.3700       8.7        80       963        95
VIS    2025250    200200   20.3200  148.3300       8.9        76       933        97
VIS    2025250    200200   20.3300  148.3200       8.9        79       925        97
VIS    2025250    200200   20.3200  148.2800       9.4        87       873        99
VIS    2025250    200200   20.3400  148.2700       9.6        89       865        98
VIS    2025250    200200   20.3400  148.2400       8.9        93       837        99
VIS    2025250    200200   20.3400  148.2200       8.8        92       834        99
VIS    2025250    200200   20.3200  148.1800       9.5        94       834       100
VIS    2025250    200200   20.3300  148.1700       9.3        92       831       100
VIS    2025250    200200   20.3300  148.1400       8.5        85       871        98
VIS    2025250    200200   20.3300  148.1100       8.4        72       894        96
VIS    2025250    200200   20.3200  148.1000       8.8        71       894        97
VIS    2025250    200200   20.3300  148.0700       8.3        87       850        98
VIS    2025250    200200   20.3300  148.0400       8.4        88       772        98
VIS    2025250    200200   20.3300  148.0000       8.3        91       738        98
VIS    2025250    200200   20.3200  148.0000       8.3        91       738        98
VIS    2025250    200200   20.3300  147.9500      11.0        88       896        97
VIS    2025250    200200   20.3300  147.9300      11.0        91       856        96
VIS    2025250    200200   20.3100  147.9200      10.2        90       830        96
VIS    2025250    200200   20.3200  147.8900       9.6        87       724        94
VIS    2025250    200200   20.3100  147.8400      10.8        76       752        91
VIS    2025250    200200   20.3300  147.8100      10.0        88       853        99
VIS    2025250    200200   20.3100  147.8000      10.0        89       841       100
VIS    2025250    200200   20.3100  147.7500       9.9        81       838        98
VIS    2025250    200200   20.3100  147.7300      10.3        80       821        97
VIS    2025250    200200   20.3300  147.7000      10.7        85       755        95
VIS    2025250    200200   20.3100  147.6900      10.3        79       747        92
VIS    2025250    200200   20.3300  147.6700       9.8        82       747        93
VIS    2025250    200200   20.3100  147.6400       9.6        82       742        94
VIS    2025250    200200   20.3200  147.6100       9.6        86       745        96
VIS    2025250    200200   20.3200  147.5200      12.0        75       823        90
VIS    2025250    200200   20.3200  147.5000       9.5        77       880        94
VIS    2025250    200200   20.3100  147.4600      10.0        86       774        97
VIS    2025250    200200   20.3200  147.4400      10.3        86       877        98
VIS    2025250    200200   20.3200  147.4100      10.3        81       882        97
VIS    2025250    200200   20.3200  147.3800      10.9        77       866        99
VIS    2025250    200200   20.3300  147.3500      11.6        64       866        93
VIS    2025250    200200   20.3300  147.3500      11.9        63       862        92
VIS    2025250    200200   20.3200  147.3100      11.7        57       854        90
VIS    2025250    200200   20.3100  147.2900      11.5        65       854        93
VIS    2025250    200200   20.3100  147.2600      12.0        72       885        98
VIS    2025250    200200   20.3200  147.2300      11.0        74       895        97
VIS    2025250    200200   20.3000  147.2000      10.5        73       912        92
VIS    2025250    200200   20.3100  147.1900      10.9        70       922        95
VIS    2025250    200200   20.3100  147.1500      11.2        76       927        94
VIS    2025250    200200   20.3200  147.1500      11.6        77       927        91
VIS    2025250    200200   20.3200  147.1000      10.4        87       938        92
VIS    2025250    200200   20.3100  147.0700      13.4        69       922        96
VIS    2025250    200200   20.3000  147.0300      14.7        64       916        95
VIS    2025250    200200   20.3100  147.0000      14.3        66       916        96
VIS    2025250    200200   20.3100  147.0000      14.1        65       916        94
VIS    2025250    200200   20.3200  146.9600      12.7        63       919        96
VIS    2025250    200200   20.3100  146.9400      12.9        67       916        97
VIS    2025250    200200   20.3200  146.9200      12.5        71       907        98
VIS    2025250    200200   20.3200  146.8900      13.5        69       889        96
VIS    2025250    200200   20.3000  146.8700      14.5        65       895        95
VIS    2025250    200200   20.3100  146.8300      14.3        68       894        94
VIS    2025250    200200   20.3200  146.8200      14.2        69       892        91
VIS    2025250    200200   20.3100  146.8000      14.7        68       909        93
VIS    2025250    200200   20.3100  146.7400      13.9        66       934        96
VIS    2025250    200200   20.3200  146.7100      14.4        64       942        96
VIS    2025250    200200   20.3100  146.7000      15.2        63       952        95
VIS    2025250    200200   20.3000  146.6500      16.8        62       960        96
VIS    2025250    200200   20.3000  146.6500      16.9        62       960        97
VIS    2025250    200200   20.2700  142.5200      13.8       114       802        90
VIS    2025250    200200   20.2800  142.4900      13.4       106       804        90
VIS    2025250    200200   20.2600  142.3800      12.5       105       818        92
VIS    2025250    200200   20.2800  142.3600      12.5       117       807        93
VIS    2025250    200200   20.3100  149.5300       8.1        73       961        94
VIS    2025250    200200   20.3100  149.5200       8.1        74       961        94
VIS    2025250    200200   20.3100  149.4900       8.2        75       942        96
VIS    2025250    200200   20.3100  149.4700       8.1        72       940        94
VIS    2025250    200200   20.3200  149.0600      10.4        71       959        95
VIS    2025250    200200   20.3200  149.0500      10.0        67       959        97
VIS    2025250    200200   20.3200  149.0100       9.4        64       918        99
VIS    2025250    200200   20.3200  148.9800      10.4        74       914        96
VIS    2025250    200200   20.3000  148.9600      10.4        72       920        96
VIS    2025250    200200   20.3000  148.9300       9.4        71       885        97
VIS    2025250    200200   20.3200  148.9000       8.0        68       888        97
VIS    2025250    200200   20.3000  148.7200       7.2        77       963        94
VIS    2025250    200200   20.3100  148.6900       7.4        67       953        93
VIS    2025250    200200   20.3100  148.6400       8.8        79       966        94
VIS    2025250    200200   20.3100  148.6200       9.1        84       959        94
VIS    2025250    200200   20.3000  148.6000       8.8        88       902        96
VIS    2025250    200200   20.3200  148.5900       8.1        88       901        95
VIS    2025250    200200   20.3100  148.5500       7.5        84       862        96
VIS    2025250    200200   20.3100  148.5200       8.5        85       878        98
VIS    2025250    200200   20.3100  148.5000       8.9        78       895        99
VIS    2025250    200200   20.3000  148.4800       8.9        72       907        99
VIS    2025250    200200   20.3000  148.4400       9.1        65       939        98
VIS    2025250    200200   20.3000  148.4300       9.1        65       945        98
VIS    2025250    200200   20.3100  148.4100       9.8        71       954        99
VIS    2025250    200200   20.3000  148.3700       9.2        69       959        98
VIS    2025250    200200   20.3100  148.3600       8.5        78       960        95
VIS    2025250    200200   20.3000  148.3100       9.0        74       904        99
VIS    2025250    200200   20.3000  148.2900       9.2        80       888        99
VIS    2025250    200200   20.3100  148.2800       9.4        86       865        99
VIS    2025250    200200   20.3100  148.2600       9.3        88       856        99
VIS    2025250    200200   20.3000  148.2100       9.8        91       842       100
VIS    2025250    200200   20.2900  148.2100      10.1        93       843        99
VIS    2025250    200200   20.2900  148.1600       9.4        94       845        99
VIS    2025250    200200   20.3000  148.1500       9.1        91       872        98
VIS    2025250    200200   20.3000  148.1100       9.2        74       888        98
VIS    2025250    200200   20.3000  148.1100       9.1        71       892        97
VIS    2025250    200200   20.2900  148.0700       9.6        79       880        99
VIS    2025250    200200   20.3000  148.0500       9.1        88       850        99
VIS    2025250    200200   20.3100  148.0200       8.2        87       772        97
VIS    2025250    200200   20.3000  147.9900       8.3        91       738        98
VIS    2025250    200200   20.3100  147.9800       8.9        92       738        98
VIS    2025250    200200   20.3100  147.9400      11.0        89       845        98
VIS    2025250    200200   20.3000  147.9300      10.8        89       845        98
VIS    2025250    200200   20.3100  147.9000       9.4        89       738        95
VIS    2025250    200200   20.3000  147.8800       8.9        84       728        95
VIS    2025250    200200   20.3000  147.8400      10.1        76       752        92
VIS    2025250    200200   20.3100  147.8300      10.7        78       775        93
VIS    2025250    200200   20.2900  147.7900       9.6        90       841       100
VIS    2025250    200200   20.3000  147.7800       9.8        88       841       100
VIS    2025250    200200   20.3100  147.7500      10.0        80       838        97
VIS    2025250    200200   20.2900  147.7100       9.5        78       776        93
VIS    2025250    200200   20.2900  147.7000       9.4        79       762        93
VIS    2025250    200200   20.2800  147.6700      10.2        77       732        92
VIS    2025250    200200   20.2800  147.6500      10.3        77       732        92
VIS    2025250    200200   20.2800  147.6200      10.5        79       755        92
VIS    2025250    200200   20.3000  147.6100      10.3        84       745        94
VIS    2025250    200200   20.2800  147.4600       9.7        87       760        97
VIS    2025250    200200   20.2800  147.4600       9.9        85       765        96
VIS    2025250    200200   20.2900  147.4100      12.3        75       877        96
VIS    2025250    200200   20.2800  147.4100      12.7        74       878        95
VIS    2025250    200200   20.2800  147.3800      13.5        80       907        96
VIS    2025250    200200   20.3000  147.3400      10.7        69       879        95
VIS    2025250    200200   20.2800  147.3000      11.1        65       860        91
VIS    2025250    200200   20.2800  147.2700      13.1        64       885        95
VIS    2025250    200200   20.2900  147.2500      12.7        67       912        97
VIS    2025250    200200   20.2900  147.2200      10.7        74       912        95
VIS    2025250    200200   20.3000  147.2100      10.5        74       912        94
VIS    2025250    200200   20.2900  147.1800      11.8        69       922        96
VIS    2025250    200200   20.3000  147.1600      11.0        73       922        96
VIS    2025250    200200   20.2900  147.1200      13.1        73       904        99
VIS    2025250    200200   20.3000  147.1100      12.9        73       916        97
VIS    2025250    200200   20.2900  147.0900      13.3        70       919        97
VIS    2025250    200200   20.2900  147.0600      12.9        67       919        97
VIS    2025250    200200   20.2800  147.0200      13.1        71       912        99
VIS    2025250    200200   20.3000  146.9900      13.8        65       919        96
VIS    2025250    200200   20.2800  146.9700      13.8        63       921        95
VIS    2025250    200200   20.2800  146.9600      13.7        62       919        95
VIS    2025250    200200   20.2800  146.9300      14.3        63       907        94
VIS    2025250    200200   20.2900  146.8900      14.8        66       899        95
VIS    2025250    200200   20.2800  146.8700      16.7        62       901        92
VIS    2025250    200200   20.2800  146.8400      15.6        63       901        90
VIS    2025250    200200   20.2900  146.8400      15.1        64       901        92
VIS    2025250    200200   20.2800  146.7900      15.9        65       916        96
VIS    2025250    200200   20.2700  146.6900      16.2        61       981        96
VIS    2025250    200200   20.2800  146.6700      16.9        62       977        97
VIS    2025250    200200   20.2500  142.3700      13.4       104       823        90
VIS    2025250    200200   20.3000  149.5200       8.1        73       961        94
VIS    2025250    200200   20.3000  149.5100       8.2        74       950        95
VIS    2025250    200200   20.3000  149.4800       8.0        73       942        93
VIS    2025250    200200   20.2800  149.0500       9.2        59       962        98
VIS    2025250    200200   20.2900  149.0300       9.2        57       956        98
VIS    2025250    200200   20.2900  148.9900      10.1        70       929        97
VIS    2025250    200200   20.2800  148.9600      10.3        73       928        96
VIS    2025250    200200   20.3000  148.9600      10.3        72       920        96
VIS    2025250    200200   20.2700  148.9100       9.3        70       890        99
VIS    2025250    200200   20.2900  148.8900       8.3        63       899        96
VIS    2025250    200200   20.2700  148.7100       7.5        81       958        94
VIS    2025250    200200   20.2900  148.6900       7.6        65       953        94
VIS    2025250    200200   20.2900  148.6400       8.5        82       969        94
VIS    2025250    200200   20.2900  148.6300       8.8        87       966        92
VIS    2025250    200200   20.2900  148.6100       9.0        91       961        91
VIS    2025250    200200   20.2800  148.5600       7.3        85       869        96
VIS    2025250    200200   20.2800  148.5500       7.5        86       866        97
VIS    2025250    200200   20.2700  148.5100       9.1        82       889        99
VIS    2025250    200200   20.2900  148.4500       9.0        65       939        99
VIS    2025250    200200   20.2700  148.4300       9.0        67       959        98
VIS    2025250    200200   20.2900  148.3900       9.5        68       959        99
VIS    2025250    200200   20.2800  148.3800       9.5        66       959        99
VIS    2025250    200200   20.2700  148.3400       8.0        73       960        96
VIS    2025250    200200   20.2700  148.3200       8.3        75       890        98
VIS    2025250    200200   20.2900  148.3000       9.0        79       888        99
VIS    2025250    200200   20.2900  148.2800       9.5        84       864       100
VIS    2025250    200200   20.2900  148.2400       9.5        85       854       100
VIS    2025250    200200   20.2700  148.2100      10.0        87       854       100
VIS    2025250    200200   20.2700  148.2100      10.1        89       844       100
VIS    2025250    200200   20.2800  148.1600       9.7        91       845       100
VIS    2025250    200200   20.2700  148.1500      10.0        88       872       100
VIS    2025250    200200   20.2700  148.1100      10.4        75       890        99
VIS    2025250    200200   20.2900  148.1100       9.7        72       890        98
VIS    2025250    200200   20.2700  148.0800      10.1        72       891        99
VIS    2025250    200200   20.2800  148.0500       9.9        87       850        99
VIS    2025250    200200   20.2700  148.0100       9.2        89       828        99
VIS    2025250    200200   20.2800  147.9900       8.4        91       800        98
VIS    2025250    200200   20.2700  147.9800       8.5        92       800        99
VIS    2025250    200200   20.2600  147.9500       9.0        88       738        97
VIS    2025250    200200   20.2800  147.9300      10.1        87       812        98
VIS    2025250    200200   20.2800  147.9100       9.7        86       810        94
VIS    2025250    200200   20.2600  147.8700       9.0        74       738        92
VIS    2025250    200200   20.2600  147.8400       9.7        74       783        92
VIS    2025250    200200   20.2600  147.8300       9.7        75       811        94
VIS    2025250    200200   20.2600  147.8100       9.3        87       847        96
VIS    2025250    200200   20.2600  147.7700       9.7        85       840       100
VIS    2025250    200200   20.2800  147.7400       9.8        80       785        96
VIS    2025250    200200   20.2800  147.7100       9.5        79       762        93
VIS    2025250    200200   20.2700  147.6900       9.8        80       747        92
VIS    2025250    200200   20.2700  147.6600      10.2        78       732        92
VIS    2025250    200200   20.2700  147.6600      10.2        78       732        92
VIS    2025250    200200   20.2800  147.6200      10.5        78       755        92
VIS    2025250    200200   20.2600  147.4900       9.1        92       808        97
VIS    2025250    200200   20.2800  147.4600       9.7        86       778        97
VIS    2025250    200200   20.2700  147.4400      11.2        75       848        97
VIS    2025250    200200   20.2600  147.4100      12.7        73       882        97
VIS    2025250    200200   20.2700  147.4100      12.9        72       882        96
VIS    2025250    200200   20.2600  147.3600      12.0        75       924        99
VIS    2025250    200200   20.2600  147.3600      11.6        74       924        99
VIS    2025250    200200   20.2700  147.3200      10.4        75       878        97
VIS    2025250    200200   20.2800  147.2900      11.6        65       863        93
VIS    2025250    200200   20.2800  147.2700      13.5        63       912        96
VIS    2025250    200200   20.2700  147.2600      14.3        64       938        97
VIS    2025250    200200   20.2500  147.2100      12.1        68       938        97
VIS    2025250    200200   20.2500  147.2100      12.2        68       935        97
VIS    2025250    200200   20.2600  147.1800      13.1        66       918        96
VIS    2025250    200200   20.2600  147.1400      13.0        71       885        97
VIS    2025250    200200   20.2500  147.1300      13.5        71       887        97
VIS    2025250    200200   20.2700  147.1000      14.0        69       907        98
VIS    2025250    200200   20.2700  147.0600      12.8        68       907        98
VIS    2025250    200200   20.2500  147.0600      13.4        69       898        98
VIS    2025250    200200   20.2700  147.0200      12.8        74       910        99
VIS    2025250    200200   20.2600  147.0000      12.9        72       910        99
VIS    2025250    200200   20.2700  146.9800      14.2        63       924        95
VIS    2025250    200200   20.2500  146.9400      15.0        61       916        97
VIS    2025250    200200   20.2700  146.9300      14.5        62       909        95
VIS    2025250    200200   20.2500  146.8900      16.8        64       909        93
VIS    2025250    200200   20.2500  146.8800      16.8        63       909        96
VIS    2025250    200200   20.2600  146.8500      17.1        63       912        92
VIS    2025250    200200   20.2600  146.8300      17.4        63       918        92
VIS    2025250    200200   20.2700  146.7900      15.8        65       916        96
VIS    2025250    200200   20.2500  146.7200      17.3        60       979        92
VIS    2025250    200200   20.2700  146.7000      16.2        61       981        97
VIS    2025250    200200   20.2200  142.4300      14.5        97       894        90
VIS    2025250    200200   20.2200  142.4000      14.1       105       907        96
VIS    2025250    200200   20.2200  142.3800      15.0       104       907        95
VIS    2025250    200200   20.2800  149.5000       8.1        69       961        94
VIS    2025250    200200   20.2600  149.0400       9.5        56       994        97
VIS    2025250    200200   20.2600  149.0400       9.1        56       994        97
VIS    2025250    200200   20.2700  149.0000       9.5        63       950        99
VIS    2025250    200200   20.2700  148.9700       9.9        70       933        98
VIS    2025250    200200   20.2500  148.9400       9.9        72       922        97
VIS    2025250    200200   20.2700  148.9300      10.1        72       906        97
VIS    2025250    200200   20.2700  148.9000       9.2        69       891        99
VIS    2025250    200200   20.2500  148.8800       8.9        65       915        99
VIS    2025250    200200   20.2600  148.6400       8.4        86       974        93
VIS    2025250    200200   20.2700  148.6100       8.5        90       908        93
VIS    2025250    200200   20.2500  148.5900       7.8        87       908        95
VIS    2025250    200200   20.2500  148.5600       7.6        83       870        97
VIS    2025250    200200   20.2500  148.5500       7.9        81       870        98
VIS    2025250    200200   20.2400  148.5100       9.2        78       911        97
VIS    2025250    200200   20.2400  148.4800       9.4        66       950       100
VIS    2025250    200200   20.2600  148.4700       9.2        63       931        99
VIS    2025250    200200   20.2400  148.4300       9.3        66       952        98
VIS    2025250    200200   20.2600  148.3700       9.2        62       959        98
VIS    2025250    200200   20.2600  148.3300       7.8        73       960        96
VIS    2025250    200200   20.2600  148.3300       7.9        74       935        96
VIS    2025250    200200   20.2600  148.2800       9.7        86       861        99
VIS    2025250    200200   20.2600  148.2800       9.8        86       860        99
VIS    2025250    200200   20.2500  148.2400       9.6        82       854       100
VIS    2025250    200200   20.2600  148.2100       9.9        87       844       100
VIS    2025250    200200   20.2500  148.1900      10.1        85       838        99
VIS    2025250    200200   20.2500  148.1600      10.1        79       845        98
VIS    2025250    200200   20.2500  148.1300      10.1        81       871       100
VIS    2025250    200200   20.2500  148.1100      10.4        76       888        99
VIS    2025250    200200   20.2400  148.0800      10.3        70       891        98
VIS    2025250    200200   20.2400  148.0700      11.1        70       891        92
VIS    2025250    200200   20.2400  148.0400      11.5        80       813        98
VIS    2025250    200200   20.2400  148.0200      10.4        85       813       100
VIS    2025250    200200   20.2600  147.9900       8.7        92       820        99
VIS    2025250    200200   20.2400  147.9600       8.5        92       800        97
VIS    2025250    200200   20.2600  147.9400       8.8        89       732        98
VIS    2025250    200200   20.2600  147.9200       9.2        89       736        95
VIS    2025250    200200   20.2500  147.9000       9.0        87       738        96
VIS    2025250    200200   20.2500  147.8600       9.2        72       738        90
VIS    2025250    200200   20.2400  147.8300      10.0        72       811        90
VIS    2025250    200200   20.2400  147.8200       9.9        75       844        92
VIS    2025250    200200   20.2400  147.7900       9.5        86       844        98
VIS    2025250    200200   20.2400  147.7600       9.8        85       792        99
VIS    2025250    200200   20.2400  147.7300       9.8        83       739        94
VIS    2025250    200200   20.2500  147.7300       9.4        81       739        94
VIS    2025250    200200   20.2400  147.6900      10.5        75       742        93
VIS    2025250    200200   20.2500  147.6600      10.3        77       735        91
VIS    2025250    200200   20.2500  147.6500      10.1        74       735        90
VIS    2025250    200200   20.2500  147.6100      10.5        73       760        90
VIS    2025250    200200   20.2400  147.5200       9.9        92       829        96
VIS    2025250    200200   20.2400  147.4900       9.4        93       813        99
VIS    2025250    200200   20.2400  147.4500      11.7        82       848        99
VIS    2025250    200200   20.2300  147.4500      12.3        81       881        98
VIS    2025250    200200   20.2500  147.4200      12.5        72       882        97
VIS    2025250    200200   20.2500  147.3800      13.1        69       933        99
VIS    2025250    200200   20.2500  147.3800      12.8        70       933       100
VIS    2025250    200200   20.2500  147.3500      11.3        74       921        98
VIS    2025250    200200   20.2300  147.3200      11.6        70       885        99
VIS    2025250    200200   20.2300  147.2800      13.8        64       899        99
VIS    2025250    200200   20.2500  147.2800      14.0        65       915        96
VIS    2025250    200200   20.2500  147.2300      13.5        66       948        99
VIS    2025250    200200   20.2500  147.2100      12.4        67       935        98
VIS    2025250    200200   20.2400  147.1800      12.5        67       907        97
VIS    2025250    200200   20.2400  147.1600      12.1        68       902        98
VIS    2025250    200200   20.2400  147.1400      13.6        70       905        99
VIS    2025250    200200   20.2300  147.1100      16.7        69       916        97
VIS    2025250    200200   20.2300  147.0900      16.9        67       916        97
VIS    2025250    200200   20.2300  147.0700      15.7        66       904        98
VIS    2025250    200200   20.2300  147.0300      14.5        66       910        99
VIS    2025250    200200   20.2400  147.0300      13.5        71       910       100
VIS    2025250    200200   20.2300  147.0000      14.3        69       927        99
VIS    2025250    200200   20.2300  146.9800      15.2        63       927        98
VIS    2025250    200200   20.2300  146.9500      16.2        63       924        97
VIS    2025250    200200   20.2300  146.9100      16.9        65       909        96
VIS    2025250    200200   20.2400  146.8800      16.6        64       909        96
VIS    2025250    200200   20.2400  146.8700      16.7        63       909        96
VIS    2025250    200200   20.2300  146.8400      16.2        64       929        97
VIS    2025250    200200   20.2400  146.8200      17.3        64       921        96
VIS    2025250    200200   20.2400  146.7100      17.3        61       987        98
VIS    2025250    200200   20.2000  142.4300      13.8       104       884        92
VIS    2025250    200200   20.1900  142.4000      13.4       116       894        99
VIS    2025250    200200   20.2100  142.3700      15.5       102       907        93
VIS    2025250    200200   20.2500  149.4800       7.6        65       942        92
VIS    2025250    200200   20.2400  149.0000       9.4        56       962        98
VIS    2025250    200200   20.2300  148.9900       9.3        53       962        98
VIS    2025250    200200   20.2300  148.9500       9.5        62       937        98
VIS    2025250    200200   20.2500  148.9400       9.7        71       925        97
VIS    2025250    200200   20.2200  148.9100       9.7        67       906        99
VIS    2025250    200200   20.2200  148.8700       8.9        65       926        99
VIS    2025250    200200   20.2300  148.5900       7.4        80       922        92
VIS    2025250    200200   20.2400  148.5900       7.7        86       908        93
VIS    2025250    200200   20.2400  148.5400       8.1        81       870        97
VIS    2025250    200200   20.2200  148.5200       8.8        78       877        99
VIS    2025250    200200   20.2300  148.4700       9.5        64       964        98
VIS    2025250    200200   20.2200  148.4600       9.8        65       966        98
VIS    2025250    200200   20.2200  148.3900       8.7        64       947        97
VIS    2025250    200200   20.2200  148.3900       8.5        65       947        97
VIS    2025250    200200   20.2200  148.3500       8.3        62       965        97
VIS    2025250    200200   20.2200  148.3200       8.1        75       869        98
VIS    2025250    200200   20.2200  148.3000       9.0        85       866        98
VIS    2025250    200200   20.2200  148.2900       9.4        86       865        98
VIS    2025250    200200   20.2200  148.2500       9.2        85       854        99
VIS    2025250    200200   20.2300  148.2300       9.6        83       850        99
VIS    2025250    200200   20.2300  148.1900       9.9        81       833       100
VIS    2025250    200200   20.2300  148.1900       9.9        80       833       100
VIS    2025250    200200   20.2300  148.1500      10.2        77       868       100
VIS    2025250    200200   20.2200  148.1200       9.1        87       871        95
VIS    2025250    200200   20.2200  148.1100       8.6        91       876        91
VIS    2025250    200200   20.2300  148.0800      10.7        70       890        95
VIS    2025250    200200   20.2300  148.0400      11.2        76       813        96
VIS    2025250    200200   20.2300  148.0200      10.2        84       813       100
VIS    2025250    200200   20.2300  148.0100       9.6        83       807        99
VIS    2025250    200200   20.2200  147.9700       8.8        91       839        95
VIS    2025250    200200   20.2200  147.9600       8.8        89       836        96
VIS    2025250    200200   20.2100  147.9400       8.3        88       729        99
VIS    2025250    200200   20.2100  147.9100       8.5        86       729        97
VIS    2025250    200200   20.2300  147.8800       8.5        85       748        98
VIS    2025250    200200   20.2200  147.8400       9.5        73       785        94
VIS    2025250    200200   20.2200  147.8300      10.0        73       788        94
VIS    2025250    200200   20.2200  147.8100      10.1        80       835        98
VIS    2025250    200200   20.2300  147.7900       9.5        86       840        99
VIS    2025250    200200   20.2300  147.7500       9.9        85       754        99
VIS    2025250    200200   20.2200  147.7300      10.2        83       738        97
VIS    2025250    200200   20.2200  147.6900      10.8        72       744        92
VIS    2025250    200200   20.2100  147.6800      10.8        71       750        93
VIS    2025250    200200   20.2100  147.6400      10.4        77       743        96
VIS    2025250    200200   20.2100  147.6300      10.5        78       736        96
VIS    2025250    200200   20.2100  147.5900      10.6        85       795        99
VIS    2025250    200200   20.2200  147.5700      11.6        78       810        97
VIS    2025250    200200   20.2300  147.5600      11.5        77       836        94
VIS    2025250    200200   20.2100  147.5000       9.6        85       860        96
VIS    2025250    200200   20.2300  147.4800      10.0        88       843        96
VIS    2025250    200200   20.2100  147.4600      11.6        79       899        94
VIS    2025250    200200   20.2300  147.3800      12.6        65       946        94
VIS    2025250    200200   20.2100  147.3500      12.5        66       932        99
VIS    2025250    200200   20.2100  147.3300      12.7        66       893        99
VIS    2025250    200200   20.2100  147.2900      13.8        63       876        93
VIS    2025250    200200   20.2200  147.2800      14.2        65       916        99
VIS    2025250    200200   20.2000  147.2400      14.7        62       940        98
VIS    2025250    200200   20.2000  147.2300      15.4        61       932        97
VIS    2025250    200200   20.2100  147.2100      14.3        63       924        98
VIS    2025250    200200   20.2100  147.1400      13.8        68       907        98
VIS    2025250    200200   20.2200  147.1000      17.1        69       916        97
VIS    2025250    200200   20.2200  147.0900      17.0        68       916        97
VIS    2025250    200200   20.2100  147.0600      16.3        62       912        96
VIS    2025250    200200   20.2000  147.0400      16.1        60       913        94
VIS    2025250    200200   20.2000  146.9900      15.9        63       930        97
VIS    2025250    200200   20.2000  146.9800      15.6        63       931        98
VIS    2025250    200200   20.2000  146.9400      16.6        64       924        97
VIS    2025250    200200   20.2100  146.9300      16.8        64       918        96
VIS    2025250    200200   20.2000  146.9100      16.2        64       912        96
VIS    2025250    200200   20.2000  146.8200      15.8        65       950        98
VIS    2025250    200200   20.2000  146.8200      15.9        64       950        98
VIS    2025250    200200   20.2200  146.7600      14.4        65       979        91
VIS    2025250    200200   20.2100  146.7200      18.0        63       989        97
VIS    2025250    200200   20.1800  142.3900      13.9       121       881        99
VIS    2025250    200200   20.1700  142.3800      13.7       120       881        98
VIS    2025250    200200   20.2200  148.9800       9.2        50       986        98
VIS    2025250    200200   20.2100  148.9700       9.3        55       948        99
VIS    2025250    200200   20.2100  148.9300       9.9        63       932        98
VIS    2025250    200200   20.2000  148.9100       9.8        68       915        98
VIS    2025250    200200   20.2100  148.8900       9.6        70       900        99
VIS    2025250    200200   20.2100  148.8500       8.9        63       938        96
VIS    2025250    200200   20.2000  148.7900       8.7        70       974        94
VIS    2025250    200200   20.2000  148.6400       7.1        76       988        91
VIS    2025250    200200   20.2000  148.6100       8.5        59       980        96
VIS    2025250    200200   20.2000  148.5800       8.2        66       918        96
VIS    2025250    200200   20.2000  148.5600       8.1        77       870        98
VIS    2025250    200200   20.2100  148.5300       8.6        81       877        97
VIS    2025250    200200   20.1900  148.4800       9.9        64       964        99
VIS    2025250    200200   20.2000  148.4700       9.9        65       964        98
VIS    2025250    200200   20.2100  148.4400       9.9        64       966        98
VIS    2025250    200200   20.2100  148.4100       9.4        62       947        99
VIS    2025250    200200   20.2100  148.3900       8.7        64       952        98
VIS    2025250    200200   20.2100  148.3500       8.1        65       965        96
VIS    2025250    200200   20.2000  148.3300       8.2        74       887        98
VIS    2025250    200200   20.2100  148.3100       8.3        78       868        98
VIS    2025250    200200   20.2100  148.3000       9.0        83       866        98
VIS    2025250    200200   20.2100  148.2500       9.1        84       854        98
VIS    2025250    200200   20.2100  148.2400       8.9        82       841        98
VIS    2025250    200200   20.2100  148.2000       9.7        79       832        99
VIS    2025250    200200   20.2100  148.2000       9.8        79       832       100
VIS    2025250    200200   20.2000  148.1500       9.4        79       870        97
VIS    2025250    200200   20.2000  148.1500       9.1        80       870        96
VIS    2025250    200200   20.1900  148.0600       9.5        79       813        96
VIS    2025250    200200   20.2000  148.0300       9.6        78       748        97
VIS    2025250    200200   20.2100  148.0200       9.1        80       807        98
VIS    2025250    200200   20.2000  147.9900       9.6        84       836       100
VIS    2025250    200200   20.2100  147.9500       8.6        88       836        97
VIS    2025250    200200   20.2100  147.9300       8.4        88       713        99
VIS    2025250    200200   20.2100  147.9100       8.4        86       729        97
VIS    2025250    200200   20.2100  147.8900       8.5        84       748        97
VIS    2025250    200200   20.2100  147.8600       8.7        77       785        96
VIS    2025250    200200   20.2000  147.8300       9.8        75       827        98
VIS    2025250    200200   20.2000  147.8200       9.9        77       835        99
VIS    2025250    200200   20.1900  147.7900       9.3        88       831        99
VIS    2025250    200200   20.2000  147.7600       9.7        87       743       100
VIS    2025250    200200   20.2000  147.7300      10.5        84       725        98
VIS    2025250    200200   20.1900  147.7100      11.5        80       736        96
VIS    2025250    200200   20.2000  147.6800      10.9        72       750        94
VIS    2025250    200200   20.1900  147.6500      10.4        76       743        95
VIS    2025250    200200   20.1900  147.6300      10.3        79       743        96
VIS    2025250    200200   20.1800  147.6100      10.2        79       768        98
VIS    2025250    200200   20.1800  147.5700      10.7        86       810        92
VIS    2025250    200200   20.1900  147.5700      10.7        87       844        93
VIS    2025250    200200   20.1900  147.5300      10.1        82       902        94
VIS    2025250    200200   20.1900  147.5100       9.6        80       890        95
VIS    2025250    200200   20.1800  147.4800      12.0        77       890        98
VIS    2025250    200200   20.2000  147.4500      12.2        77       932        92
VIS    2025250    200200   20.2000  147.4100      13.7        66       956       100
VIS    2025250    200200   20.2000  147.3300      13.3        65       906        97
VIS    2025250    200200   20.2000  147.3200      13.3        65       893        97
VIS    2025250    200200   20.1800  147.2500      14.3        64       940        99
VIS    2025250    200200   20.1800  147.2300      15.1        62       932        97
VIS    2025250    200200   20.1900  147.2000      13.7        64       909        98
VIS    2025250    200200   20.1800  147.1800      12.7        66       909        95
VIS    2025250    200200   20.2000  147.1600      12.4        65       907        97
VIS    2025250    200200   20.2000  147.0800      14.9        67       920        99
VIS    2025250    200200   20.1900  147.0700      15.0        63       920        98
VIS    2025250    200200   20.2000  147.0400      15.6        61       913        94
VIS    2025250    200200   20.1800  147.0000      15.7        61       934        97
VIS    2025250    200200   20.1800  146.9800      15.4        62       938        97
VIS    2025250    200200   20.1800  146.9700      15.0        62       936        97
VIS    2025250    200200   20.1800  146.9400      15.6        64       936        97
VIS    2025250    200200   20.1900  146.9200      15.4        66       923        97
VIS    2025250    200200   20.1800  146.8900      14.6        65       936        98
VIS    2025250    200200   20.1800  146.8700      15.3        63       957        98
VIS    2025250    200200   20.2000  146.8300      15.6        65       950        97
VIS    2025250    200200   20.2000  146.8200      15.7        65       950        98
VIS    2025250    200200   20.2000  146.8000      16.1        61       951        97
VIS    2025250    200200   20.1400  142.4100      13.8       126       846        96
VIS    2025250    200200   20.1400  142.3800      12.6       130       858        98
VIS    2025250    200200   20.1400  142.3500      12.7       131       858        98
VIS    2025250    200200   20.1900  148.9600       9.5        54       969        98
VIS    2025250    200200   20.1800  148.9500       9.6        55       969        98
VIS    2025250    200200   20.1800  148.9100       9.7        68       915        98
VIS    2025250    200200   20.1900  148.9000       9.8        70       915        98
VIS    2025250    200200   20.1800  148.8600       9.2        71       900        99
VIS    2025250    200200   20.1700  148.7800       8.8        75       938        95
VIS    2025250    200200   20.1700  148.7700       8.6        74       943        95
VIS    2025250    200200   20.1800  148.6200       8.4        61       980        98
VIS    2025250    200200   20.1700  148.5900       9.2        55       918        98
VIS    2025250    200200   20.1900  148.5600       8.2        71       870        98
VIS    2025250    200200   20.1800  148.5400       8.3        80       871        98
VIS    2025250    200200   20.1900  148.5000       9.3        70       927        98
VIS    2025250    200200   20.1700  148.4800       9.8        58       970        95
VIS    2025250    200200   20.1700  148.4700       9.8        58       970        98
VIS    2025250    200200   20.1900  148.4400      10.3        63       969        98
VIS    2025250    200200   20.1800  148.3900       9.5        62       982        98
VIS    2025250    200200   20.1800  148.3500       7.6        78       901        95
VIS    2025250    200200   20.1700  148.3500       7.6        81       901        94
VIS    2025250    200200   20.1700  148.3200       7.9        83       860        97
VIS    2025250    200200   20.1800  148.2800       9.2        75       863       100
VIS    2025250    200200   20.1700  148.2600       9.2        74       861       100
VIS    2025250    200200   20.1800  148.2300       8.8        79       841        98
VIS    2025250    200200   20.1700  148.2000       9.0        82       831        99
VIS    2025250    200200   20.1800  148.1800       9.4        79       839        98
VIS    2025250    200200   20.1900  148.1700       9.6        77       839        99
VIS    2025250    200200   20.1600  148.1000       9.4        62       940        91
VIS    2025250    200200   20.1600  148.0700       8.2        71       805        94
VIS    2025250    200200   20.1800  148.0300       9.2        79       742        98
VIS    2025250    200200   20.1800  148.0200       9.2        79       748        98
VIS    2025250    200200   20.1800  147.9800       9.9        83       845       100
VIS    2025250    200200   20.1800  147.9700       9.7        83       837       100
VIS    2025250    200200   20.1600  147.9400       8.4        92       773        98
VIS    2025250    200200   20.1700  147.9200       8.1        91       719        98
VIS    2025250    200200   20.1600  147.8800       8.7        79       739        97
VIS    2025250    200200   20.1600  147.8500      10.0        65       803        92
VIS    2025250    200200   20.1800  147.8300      10.1        68       827        96
VIS    2025250    200200   20.1800  147.8200      10.0        71       835        98
VIS    2025250    200200   20.1800  147.7800       9.3        89       753       100
VIS    2025250    200200   20.1600  147.7700       9.2        89       747       100
VIS    2025250    200200   20.1700  147.7300       9.8        81       736        97
VIS    2025250    200200   20.1700  147.7200      11.0        81       736        97
VIS    2025250    200200   20.1700  147.6900      11.4        78       738        96
VIS    2025250    200200   20.1700  147.6700      11.0        77       744        96
VIS    2025250    200200   20.1600  147.6400      10.0        80       741        97
VIS    2025250    200200   20.1800  147.6100      10.2        79       768        97
VIS    2025250    200200   20.1600  147.5900      10.6        74       813        99
VIS    2025250    200200   20.1800  147.5700      10.8        84       813        92
VIS    2025250    200200   20.1800  147.5300      10.1        79       914        95
VIS    2025250    200200   20.1600  147.5200      10.2        74       914        96
VIS    2025250    200200   20.1600  147.4800      13.3        81       904        97
VIS    2025250    200200   20.1600  147.4300      11.0        72       967        97
VIS    2025250    200200   20.1600  147.4200      10.7        71       973        97
VIS    2025250    200200   20.1700  147.4000      11.9        65       967        99
VIS    2025250    200200   20.1800  147.3600      13.0        64       952       100
VIS    2025250    200200   20.1600  147.3400      13.2        62       960        98
VIS    2025250    200200   20.1700  147.3200      13.7        63       952        97
VIS    2025250    200200   20.1600  147.2900      11.7        69       971        95
VIS    2025250    200200   20.1600  147.2600      13.0        67       954       100
VIS    2025250    200200   20.1700  147.2300      14.8        63       927        97
VIS    2025250    200200   20.1700  147.2300      14.9        62       924        97
VIS    2025250    200200   20.1600  147.1800      11.8        70       909        95
VIS    2025250    200200   20.1600  147.1700      11.7        70       910        96
VIS    2025250    200200   20.1600  147.1500      11.2        77       923        92
VIS    2025250    200200   20.1700  147.1200      11.8        81       948        93
VIS    2025250    200200   20.1700  147.0900      12.2        74       948        95
VIS    2025250    200200   20.1700  147.0800      13.5        67       934        99
VIS    2025250    200200   20.1700  147.0500      14.8        62       918        97
VIS    2025250    200200   20.1700  147.0100      15.4        60       934        97
VIS    2025250    200200   20.1700  147.0000      15.5        60       934        97
VIS    2025250    200200   20.1500  146.9600      15.2        62       938        98
VIS    2025250    200200   20.1700  146.9500      15.4        63       937        97
VIS    2025250    200200   20.1600  146.8800      14.7        65       957        98
VIS    2025250    200200   20.1700  146.8300      15.9        64       977        95
VIS    2025250    200200   20.1600  146.8000      15.7        63       976        93
VIS    2025250    200200   20.1600  146.7800      15.1        67       959        92
VIS    2025250    200200   20.1500  146.7200      17.5        61       922        95
VIS    2025250    200200   20.1100  142.4400      13.2       121       840        96
VIS    2025250    200200   20.1200  142.4100      13.7       123       844        95
VIS    2025250    200200   20.1300  142.3800      12.5       131       851        99
VIS    2025250    200200   20.1300  142.3700      12.4       131       855        99
VIS    2025250    200200   20.1200  142.3500      12.0       129       850        99
VIS    2025250    200200   20.1600  149.3400       8.6        55       988        92
VIS    2025250    200200   20.1500  149.0100       9.0        62       999        96
VIS    2025250    200200   20.1500  148.9900       9.2        64       996        96
VIS    2025250    200200   20.1700  148.9400       9.6        57       969        97
VIS    2025250    200200   20.1600  148.9200       9.6        63       962        96
VIS    2025250    200200   20.1600  148.8900       9.9        69       918        97
VIS    2025250    200200   20.1500  148.8600       9.3        69       918        99
VIS    2025250    200200   20.1600  148.7800       8.9        79       938        93
VIS    2025250    200200   20.1600  148.7700       8.6        77       937        95
VIS    2025250    200200   20.1600  148.7500       8.5        75       943        92
VIS    2025250    200200   20.1600  148.7100       7.6        85       949        90
VIS    2025250    200200   20.1500  148.6900       7.8        88       932        91
VIS    2025250    200200   20.1500  148.6100       8.1        64       954        96
VIS    2025250    200200   20.1700  148.5900       9.0        55       918        98
VIS    2025250    200200   20.1600  148.5600       8.2        72       874        98
VIS    2025250    200200   20.1600  148.5400       8.2        81       876        97
VIS    2025250    200200   20.1500  148.5200       8.6        76       911        97
VIS    2025250    200200   20.1400  148.4800       9.4        63       978        96
VIS    2025250    200200   20.1600  148.4700      10.2        60       970        95
VIS    2025250    200200   20.1600  148.4300      10.7        59       976        97
VIS    2025250    200200   20.1600  148.4200      10.6        60       976        96
VIS    2025250    200200   20.1600  148.4000      10.1        63       976        95
VIS    2025250    200200   20.1600  148.3700       7.6        77       949        91
VIS    2025250    200200   20.1500  148.3400       7.9        85       887        93
VIS    2025250    200200   20.1600  148.3200       8.0        83       857        97
VIS    2025250    200200   20.1400  148.2900       9.0        78       859        99
VIS    2025250    200200   20.1500  148.2600       9.1        74       854        99
VIS    2025250    200200   20.1500  148.2500       9.0        75       852        99
VIS    2025250    200200   20.1400  148.2100       8.7        81       836        98
VIS    2025250    200200   20.1400  148.1800       9.2        84       873        96
VIS    2025250    200200   20.1600  148.1600       9.4        76       873        96
VIS    2025250    200200   20.1600  148.1500       9.3        78       888        96
VIS    2025250    200200   20.1500  148.1100      10.1        62       940        98
VIS    2025250    200200   20.1400  148.0900       9.9        52       886        94
VIS    2025250    200200   20.1600  148.0700       8.3        67       876        96
VIS    2025250    200200   20.1400  148.0500       9.0        71       826        96
VIS    2025250    200200   20.1400  148.0100      10.8        55       837        91
VIS    2025250    200200   20.1500  148.0000      10.2        64       834        95
VIS    2025250    200200   20.1500  147.9600       8.6        86       834        98
VIS    2025250    200200   20.1400  147.9400       8.6        96       773        98
VIS    2025250    200200   20.1500  147.9300       8.2        94       722        96
VIS    2025250    200200   20.1400  147.8900       8.7        80       741        95
VIS    2025250    200200   20.1500  147.8600       9.9        70       773        94
VIS    2025250    200200   20.1500  147.8500      10.3        66       785        92
VIS    2025250    200200   20.1400  147.8100       9.7        82       741        98
VIS    2025250    200200   20.1400  147.7800       9.6        87       724        99
VIS    2025250    200200   20.1400  147.7800       9.7        85       727        99
VIS    2025250    200200   20.1600  147.7400       9.8        80       743        97
VIS    2025250    200200   20.1600  147.7300      10.2        79       738        97
VIS    2025250    200200   20.1300  147.6800      10.1        86       739        99
VIS    2025250    200200   20.1500  147.6700      10.1        83       741        98
VIS    2025250    200200   20.1400  147.6500       9.2        83       741        96
VIS    2025250    200200   20.1300  147.5900      12.1        69       904        98
VIS    2025250    200200   20.1300  147.5600      10.7        73       966        95
VIS    2025250    200200   20.1300  147.5300      10.8        69       916        97
VIS    2025250    200200   20.1300  147.5300      11.1        69       916        98
VIS    2025250    200200   20.1400  147.5000      12.5        76       912        97
VIS    2025250    200200   20.1500  147.4300      11.5        75       972        96
VIS    2025250    200200   20.1500  147.4200      11.4        73       973        96
VIS    2025250    200200   20.1400  147.4000      13.4        64       967        99
VIS    2025250    200200   20.1500  147.3600      13.5        61       960        99
VIS    2025250    200200   20.1300  147.3400      12.1        65       959        97
VIS    2025250    200200   20.1500  147.3300      12.4        63       969        95
VIS    2025250    200200   20.1400  147.2500      13.0        68       936        99
VIS    2025250    200200   20.1300  147.2100      12.6        65       912        98
VIS    2025250    200200   20.1300  147.1800      11.6        68       912        97
VIS    2025250    200200   20.1400  147.1800      11.7        69       910        96
VIS    2025250    200200   20.1500  147.1500      11.3        77       923        90
VIS    2025250    200200   20.1300  147.1300      12.3        76       925        94
VIS    2025250    200200   20.1300  147.0800      12.4        67       934        98
VIS    2025250    200200   20.1500  147.0800      12.5        68       934        98
VIS    2025250    200200   20.1300  147.0300      14.8        61       929        98
VIS    2025250    200200   20.1500  147.0200      15.0        61       934        98
VIS    2025250    200200   20.1500  146.8900      14.3        65       957        95
VIS    2025250    200200   20.1200  146.7300      17.0        64       896        94
VIS    2025250    200200   20.0900  142.3800      14.7       111       823        91
VIS    2025250    200200   20.0900  142.3700      14.3       109       823        92
VIS    2025250    200200   20.1000  142.3400      12.3       121       849        98
VIS    2025250    200200   20.1500  149.3300       8.3        56       988        94
VIS    2025250    200200   20.1300  149.3100       8.2        63       971        93
VIS    2025250    200200   20.1300  149.2900       8.3        66       971        92
VIS    2025250    200200   20.1300  149.2700       8.7        69       971        90
VIS    2025250    200200   20.1300  149.0300       8.8        58       999        98
VIS    2025250    200200   20.1400  149.0000       9.2        62       996        97
VIS    2025250    200200   20.1400  148.9000       9.8        62       960        96
VIS    2025250    200200   20.1300  148.8900       9.8        63       956        95
VIS    2025250    200200   20.1200  148.8600       9.5        63       933        99
VIS    2025250    200200   20.1200  148.7700       6.6        79       929        92
VIS    2025250    200200   20.1200  148.7700       6.5        79       929        93
VIS    2025250    200200   20.1300  148.7400       7.4        80       943        91
VIS    2025250    200200   20.1200  148.7100       7.5        81       961        91
VIS    2025250    200200   20.1400  148.6800       8.3        84       901        95
VIS    2025250    200200   20.1200  148.6600       8.1        78       901        96
VIS    2025250    200200   20.1400  148.6300       8.4        73       932        91
VIS    2025250    200200   20.1300  148.6000       8.2        67       922        96
VIS    2025250    200200   20.1200  148.5900       8.2        68       918        96
VIS    2025250    200200   20.1300  148.5600       8.1        74       874        98
VIS    2025250    200200   20.1200  148.5400       8.0        74       889        98
VIS    2025250    200200   20.1200  148.4700       9.7        66       978        97
VIS    2025250    200200   20.1300  148.4700       9.9        66       978        97
VIS    2025250    200200   20.1300  148.4400      10.5        58       976        99
VIS    2025250    200200   20.1200  148.4000      10.3        56       964        99
VIS    2025250    200200   20.1200  148.3800       9.3        68       962        96
VIS    2025250    200200   20.1200  148.3500       8.5        83       949        91
VIS    2025250    200200   20.1200  148.3300       8.4        82       879        97
VIS    2025250    200200   20.1300  148.3000       8.5        78       857        97
VIS    2025250    200200   20.1200  148.2900       9.0        78       857        98
VIS    2025250    200200   20.1400  148.2600       9.2        80       854       100
VIS    2025250    200200   20.1400  148.2400       8.9        79       841        98
VIS    2025250    200200   20.1200  148.2000       9.6        85       859        98
VIS    2025250    200200   20.1300  148.1700       9.4        83       884        95
VIS    2025250    200200   20.1200  148.1700       9.6        80       894        95
VIS    2025250    200200   20.1300  148.1400       9.5        74       900        98
VIS    2025250    200200   20.1100  148.1000       9.5        58       893        95
VIS    2025250    200200   20.1300  148.0800       9.3        55       882        94
VIS    2025250    200200   20.1100  148.0600       9.3        68       886        98
VIS    2025250    200200   20.1200  148.0400       9.8        65       840        95
VIS    2025250    200200   20.1200  148.0000      11.5        51       859        90
VIS    2025250    200200   20.1300  147.9900      10.8        55       840        91
VIS    2025250    200200   20.1200  147.9500       8.8        88       804        99
VIS    2025250    200200   20.1300  147.9400       8.9        93       773        99
VIS    2025250    200200   20.1100  147.9000       9.9        78       785        93
VIS    2025250    200200   20.1200  147.8900       9.7        77       785        92
VIS    2025250    200200   20.1200  147.8500      10.0        70       777        93
VIS    2025250    200200   20.1200  147.8200       9.8        76       753        97
VIS    2025250    200200   20.1200  147.8000       9.8        81       741        98
VIS    2025250    200200   20.1200  147.7900       9.9        83       729        98
VIS    2025250    200200   20.1300  147.7600       9.6        80       736        97
VIS    2025250    200200   20.1300  147.7400       9.8        78       736        96
VIS    2025250    200200   20.1100  147.7100      10.5        81       734        97
VIS    2025250    200200   20.1300  147.6900      10.3        86       739        99
VIS    2025250    200200   20.1200  147.6600       9.3        86       741        98
VIS    2025250    200200   20.1100  147.6200      11.2        72       817        95
VIS    2025250    200200   20.1100  147.6200      11.5        72       817        96
VIS    2025250    200200   20.1300  147.6000      12.3        69       904        99
VIS    2025250    200200   20.1100  147.5600      10.3        71       974        94
VIS    2025250    200200   20.1300  147.5300      11.2        69       916        97
VIS    2025250    200200   20.1300  147.5100      12.6        73       912        96
VIS    2025250    200200   20.1200  147.4000      14.5        61       978        98
VIS    2025250    200200   20.1200  147.4000      13.8        63       978        99
VIS    2025250    200200   20.1300  147.3500      12.2        65       954        99
VIS    2025250    200200   20.1300  147.3500      12.1        65       954        98
VIS    2025250    200200   20.1100  147.3000      10.4        73       952        95
VIS    2025250    200200   20.1200  147.2800      11.9        68       954        97
VIS    2025250    200200   20.1100  147.2400      13.6        62       924        97
VIS    2025250    200200   20.1100  147.2000      12.4        62       913        97
VIS    2025250    200200   20.1200  147.1900      11.8        65       912        97
VIS    2025250    200200   20.1100  147.1000      13.5        66       959        98
VIS    2025250    200200   20.1200  147.1000      12.9        66       934        98
VIS    2025250    200200   20.1100  147.0400      15.1        60       929        97
VIS    2025250    200200   20.1100  147.0200      15.6        59       957        99
VIS    2025250    200200   20.1100  146.9800      15.6        61       946        99
VIS    2025250    200200   20.1000  146.8800      14.5        59       982        98
VIS    2025250    200200   20.1100  146.8300      15.7        59       982        98
VIS    2025250    200200   20.0600  142.3200      14.4       119       845        91
VIS    2025250    200200   20.1200  150.4000       7.2        79       962        91
VIS    2025250    200200   20.1200  150.3700       6.7        82       929        97
VIS    2025250    200200   20.1200  150.3600       6.5        83       929        97
VIS    2025250    200200   20.1200  150.3400       5.9        85       935        93
VIS    2025250    200200   20.1000  149.3300       8.0        57       995        94
VIS    2025250    200200   20.1200  149.3100       8.1        63       971        93
VIS    2025250    200200   20.1000  149.2700       8.7        71       965        90
VIS    2025250    200200   20.1100  149.1800       8.6        63       992        97
VIS    2025250    200200   20.1200  149.0300       8.8        58       999        98
VIS    2025250    200200   20.1000  148.9800       9.3        61       994        96
VIS    2025250    200200   20.1200  148.9600       9.4        60       996        94
VIS    2025250    200200   20.1100  148.8800       9.2        57       956        95
VIS    2025250    200200   20.1200  148.8500       9.3        64       933        99
VIS    2025250    200200   20.1000  148.8300       9.0        71       949        95
VIS    2025250    200200   20.1000  148.8200       8.9        71       949        95
VIS    2025250    200200   20.1200  148.7700       6.4        80       929        93
VIS    2025250    200200   20.1000  148.7400       7.1        80       940        92
VIS    2025250    200200   20.1000  148.7200       8.0        74       963        94
VIS    2025250    200200   20.1000  148.6900       7.8        65       960        96
VIS    2025250    200200   20.1100  148.6600       8.1        72       887        98
VIS    2025250    200200   20.1100  148.6300       8.9        73       896        98
VIS    2025250    200200   20.1000  148.6200       8.9        71       896        98
VIS    2025250    200200   20.1200  148.5900       8.5        68       918        97
VIS    2025250    200200   20.1000  148.5700       8.7        71       890        97
VIS    2025250    200200   20.1100  148.5300       8.0        72       911        97
VIS    2025250    200200   20.1100  148.5100       8.7        65       972        97
VIS    2025250    200200   20.0900  148.4900       9.8        62       975        98
VIS    2025250    200200   20.0900  148.4600      10.0        59       972        99
VIS    2025250    200200   20.1000  148.4300      10.5        53       962       100
VIS    2025250    200200   20.0900  148.4100      10.4        53       956        99
VIS    2025250    200200   20.1000  148.3900      10.0        61       961        98
VIS    2025250    200200   20.1100  148.3600       8.7        80       953        92
VIS    2025250    200200   20.1100  148.3300       8.4        81       879        98
VIS    2025250    200200   20.1100  148.3200       8.4        80       879        98
VIS    2025250    200200   20.1000  148.2900       8.8        75       857        99
VIS    2025250    200200   20.1000  148.2700       9.0        79       854       100
VIS    2025250    200200   20.1000  148.2400       9.1        87       853        98
VIS    2025250    200200   20.1000  148.2100      10.1        82       861        99
VIS    2025250    200200   20.1100  148.2000       9.9        85       878        97
VIS    2025250    200200   20.0900  148.1600       9.8        73       897        97
VIS    2025250    200200   20.1000  148.1300       9.1        61       903        95
VIS    2025250    200200   20.0900  148.1100       9.4        59       889        94
VIS    2025250    200200   20.0900  148.1000       9.3        61       886        96
VIS    2025250    200200   20.1100  148.0600       9.4        69       886        98
VIS    2025250    200200   20.1000  148.0300       9.9        63       893        98
VIS    2025250    200200   20.0900  148.0000      10.7        55       889        95
VIS    2025250    200200   20.1000  147.9800      10.4        58       867        93
VIS    2025250    200200   20.1100  147.9600       8.8        73       813        95
VIS    2025250    200200   20.0900  147.9400       8.9        86       793        98
VIS    2025250    200200   20.1100  147.9200       9.6        84       746        98
VIS    2025250    200200   20.0900  147.8800      10.3        73       785        90
VIS    2025250    200200   20.0900  147.8500      10.4        75       757        95
VIS    2025250    200200   20.1100  147.8200       9.7        81       751        98
VIS    2025250    200200   20.1100  147.8000       9.9        83       741        98
VIS    2025250    200200   20.1100  147.7500       9.8        79       741        97
VIS    2025250    200200   20.0800  147.7300       9.7        82       728        97
VIS    2025250    200200   20.0900  147.7100      10.1        82       729        98
VIS    2025250    200200   20.0900  147.6900      10.1        82       736        98
VIS    2025250    200200   20.1000  147.6700       9.6        83       741        97
VIS    2025250    200200   20.1000  147.6300      10.9        71       817        95
VIS    2025250    200200   20.1000  147.6200      11.5        70       868        95
VIS    2025250    200200   20.0800  147.5500      13.0        62       973        97
VIS    2025250    200200   20.0900  147.5500      12.1        65       973        98
VIS    2025250    200200   20.0900  147.5200      11.7        73       922        93
VIS    2025250    200200   20.0800  147.4800      12.1        80       925        93
VIS    2025250    200200   20.0900  147.4700      12.6        80       925        91
VIS    2025250    200200   20.0900  147.4300      14.0        67       966        98
VIS    2025250    200200   20.1000  147.4200      15.2        68       972        96
VIS    2025250    200200   20.0900  147.4000      13.9        62       965        98
VIS    2025250    200200   20.1000  147.3600      12.1        65       946        99
VIS    2025250    200200   20.0800  147.3500      12.6        66       944       100
VIS    2025250    200200   20.0900  147.3100      11.0        72       935        95
VIS    2025250    200200   20.1000  147.2800      10.7        71       930        94
VIS    2025250    200200   20.0800  147.2500      12.8        58       921        94
VIS    2025250    200200   20.0900  147.2400      13.5        58       924        94
VIS    2025250    200200   20.0900  147.2200      14.1        57       923        95
VIS    2025250    200200   20.1000  147.2000      13.0        62       923        97
VIS    2025250    200200   20.0900  147.1000      15.0        62       971        98
VIS    2025250    200200   20.0800  147.0900      15.7        63       966        98
VIS    2025250    200200   20.0900  147.0600      15.4        63       929        98
VIS    2025250    200200   20.0800  147.0200      16.2        60       970        98
VIS    2025250    200200   20.0900  147.0000      16.2        60       972        98
VIS    2025250    200200   20.1000  146.8800      14.5        59       985        94
VIS    2025250    200200   20.1000  146.8800      14.7        59       982        99
VIS    2025250    200200   20.0800  146.8400      16.7        60       983        97
VIS    2025250    200200   20.0900  146.8200      16.1        60       982        98
VIS    2025250    200200   20.0900  146.8000      16.4        60       973        97
VIS    2025250    200200   20.0900  146.7800      17.1        61       972        95
VIS    2025250    200200   20.0600  142.3300      15.1       115       845        90
VIS    2025250    200200   20.1000  150.3900       7.3        79       962        90
VIS    2025250    200200   20.1000  150.3700       6.7        80       929        97
VIS    2025250    200200   20.1100  150.3400       6.0        80       929        96
VIS    2025250    200200   20.0900  150.3300       6.7        73       919        99
VIS    2025250    200200   20.0800  149.3000       8.4        59       969        92
VIS    2025250    200200   20.0800  149.2600       8.9        64       962        92
VIS    2025250    200200   20.0900  149.2500       9.1        71       965        93
VIS    2025250    200200   20.0800  149.1600       8.9        59       986        97
VIS    2025250    200200   20.0800  148.9800       9.4        63       984        96
VIS    2025250    200200   20.0800  148.9500       9.1        61       971        97
VIS    2025250    200200   20.0800  148.8800       9.2        63       990        95
VIS    2025250    200200   20.0900  148.8300       9.0        71       960        94
VIS    2025250    200200   20.0900  148.8200       9.0        71       960        94
VIS    2025250    200200   20.0900  148.7300       8.0        73       963        94
VIS    2025250    200200   20.0900  148.7000       8.1        67       962        96
VIS    2025250    200200   20.0900  148.7000       8.2        62       960        97
VIS    2025250    200200   20.0900  148.6700       8.4        60       872        96
VIS    2025250    200200   20.0700  148.6200       8.5        71       881        99
VIS    2025250    200200   20.0700  148.6000       8.8        70       910        97
VIS    2025250    200200   20.0700  148.5800       9.3        75       910        98
VIS    2025250    200200   20.0900  148.5700       8.7        72       890        98
VIS    2025250    200200   20.0900  148.5500       7.8        78       892        96
VIS    2025250    200200   20.0800  148.5000       9.4        62       974        99
VIS    2025250    200200   20.0700  148.4700      10.0        58       982       100
VIS    2025250    200200   20.0900  148.4500      10.1        56       968       100
VIS    2025250    200200   20.0700  148.4400      10.4        50       956        99
VIS    2025250    200200   20.0900  148.4000      10.3        55       956        99
VIS    2025250    200200   20.0800  148.4000      10.1        57       939        99
VIS    2025250    200200   20.0800  148.3700       9.4        71       941        95
VIS    2025250    200200   20.0700  148.3300       8.9        76       920        96
VIS    2025250    200200   20.0800  148.3200       8.6        76       879        99
VIS    2025250    200200   20.0700  148.2700       8.4        74       857        99
VIS    2025250    200200   20.0800  148.2700       8.6        76       857        99
VIS    2025250    200200   20.0700  148.2300       9.2        82       861        98
VIS    2025250    200200   20.0900  148.2000      10.1        77       888        99
VIS    2025250    200200   20.0800  148.2000      10.1        75       893        99
VIS    2025250    200200   20.0800  148.1500       9.9        70       903        97
VIS    2025250    200200   20.0700  148.1400      10.1        65       903        97
VIS    2025250    200200   20.0800  148.1100       9.4        65       889        97
VIS    2025250    200200   20.0600  148.0700      11.1        72       881        99
VIS    2025250    200200   20.0600  148.0600      11.5        76       881        93
VIS    2025250    200200   20.0800  148.0300       9.5        69       893        98
VIS    2025250    200200   20.0600  148.0100       9.1        73       838        98
VIS    2025250    200200   20.0800  147.9800       8.9        72       813        95
VIS    2025250    200200   20.0800  147.9600       8.4        80       804        96
VIS    2025250    200200   20.0800  147.9400       8.7        84       793        98
VIS    2025250    200200   20.0800  147.9100      10.0        80       793        95
VIS    2025250    200200   20.0600  147.8900       9.9        85       737        96
VIS    2025250    200200   20.0800  147.8500      10.4        75       747        96
VIS    2025250    200200   20.0800  147.8300      10.6        76       751        96
VIS    2025250    200200   20.0800  147.8000      10.0        83       751        99
VIS    2025250    200200   20.0700  147.7900      10.1        86       751       100
VIS    2025250    200200   20.0700  147.7700      10.0        86       744       100
VIS    2025250    200200   20.0600  147.7300      10.0        85       708        98
VIS    2025250    200200   20.0700  147.7200      10.0        83       724        97
VIS    2025250    200200   20.0800  147.6900      10.2        82       739        97
VIS    2025250    200200   20.0800  147.6500      11.0        69       746        92
VIS    2025250    200200   20.0800  147.6300      12.6        62       890        96
VIS    2025250    200200   20.0700  147.6200      14.1        59       962        97
VIS    2025250    200200   20.0600  147.5700      14.6        58       974        95
VIS    2025250    200200   20.0600  147.5700      14.5        60       974        92
VIS    2025250    200200   20.0600  147.5400      12.9        64       971        93
VIS    2025250    200200   20.0800  147.4800      11.7        79       925        94
VIS    2025250    200200   20.0800  147.4700      11.9        79       930        92
VIS    2025250    200200   20.0600  147.4300      12.7        58       952        99
VIS    2025250    200200   20.0600  147.4000      13.6        61       952        99
VIS    2025250    200200   20.0700  147.3900      13.1        63       946        99
VIS    2025250    200200   20.0700  147.3500      13.2        64       944        99
VIS    2025250    200200   20.0700  147.3500      13.2        64       939        99
VIS    2025250    200200   20.0700  147.3200      12.4        68       924        97
VIS    2025250    200200   20.0800  147.2900      11.4        72       914        96
VIS    2025250    200200   20.0700  147.2700      11.4        69       911        97
VIS    2025250    200200   20.0700  147.2200      13.6        53       924        93
VIS    2025250    200200   20.0700  147.1000      15.6        62       966        98
VIS    2025250    200200   20.0600  147.0300      15.9        60       951        98
VIS    2025250    200200   20.0700  147.0200      16.2        60       970        98
VIS    2025250    200200   20.0600  146.8600      17.3        61       983        96
VIS    2025250    200200   20.0700  146.8300      17.3        62       982        95
VIS    2025250    200200   20.0700  146.8300      17.1        61       982        95
VIS    2025250    200200   20.0600  146.8000      16.1        69       929        97
VIS    2025250    200200   20.0600  146.7700      16.6        67       841        93
VIS    2025250    200200   20.0800  150.8500       7.1        80       995        94
VIS    2025250    200200   20.0900  150.3900       7.4        79       929        97
VIS    2025250    200200   20.0900  150.3300       6.7        72       919        98
VIS    2025250    200200   20.0700  149.3100       8.4        55       989        90
VIS    2025250    200200   20.0700  149.3100       8.4        55       989        90
VIS    2025250    200200   20.0700  149.2700       9.0        57       962        92
VIS    2025250    200200   20.0700  149.2500       9.0        65       973        96
VIS    2025250    200200   20.0600  149.2300       8.9        64       997        95
VIS    2025250    200200   20.0700  149.1600       8.9        58       986        97
VIS    2025250    200200   20.0500  149.0600       9.3        75       982        91
VIS    2025250    200200   20.0600  149.0500       9.0        75       986        91
VIS    2025250    200200   20.0700  148.9900       9.6        64       994        95
VIS    2025250    200200   20.0600  148.9600       9.2        64       969        97
VIS    2025250    200200   20.0500  148.9400       9.3        64       968        95
VIS    2025250    200200   20.0500  148.9300       9.3        64       971        93
VIS    2025250    200200   20.0500  148.8300       9.2        66       965        96
VIS    2025250    200200   20.0500  148.8300       9.2        66       962        96
VIS    2025250    200200   20.0500  148.7900       9.2        69       960        93
VIS    2025250    200200   20.0500  148.7400       8.7        75       982        92
VIS    2025250    200200   20.0500  148.7100       8.2        70       968        95
VIS    2025250    200200   20.0600  148.6900       8.4        66       896        97
VIS    2025250    200200   20.0600  148.6600       8.4        61       865        94
VIS    2025250    200200   20.0500  148.6400       8.6        66       865        98
VIS    2025250    200200   20.0600  148.6200       8.4        69       879        98
VIS    2025250    200200   20.0600  148.6000       9.1        73       910        98
VIS    2025250    200200   20.0400  148.5600       8.3        75       910        96
VIS    2025250    200200   20.0500  148.5400       6.8        77       901        92
VIS    2025250    200200   20.0500  148.4800       9.5        61       991        99
VIS    2025250    200200   20.0500  148.4700       9.6        62       991        98
VIS    2025250    200200   20.0400  148.4300       9.7        56       933        99
VIS    2025250    200200   20.0400  148.4100      10.0        53       933        98
VIS    2025250    200200   20.0600  148.3900      10.2        59       933        99
VIS    2025250    200200   20.0600  148.3600       9.3        73       929        97
VIS    2025250    200200   20.0600  148.3300       8.9        74       922        97
VIS    2025250    200200   20.0500  148.3300       8.9        70       899        99
VIS    2025250    200200   20.0600  148.3000       8.6        67       857        97
VIS    2025250    200200   20.0400  148.2800       8.9        74       859        98
VIS    2025250    200200   20.0600  148.2400       9.1        83       865        98
VIS    2025250    200200   20.0600  148.2300       9.5        78       868        99
VIS    2025250    200200   20.0500  148.1900      10.2        65       881        98
VIS    2025250    200200   20.0500  148.1800      10.4        63       889        98
VIS    2025250    200200   20.0400  148.1400      10.8        63       886        96
VIS    2025250    200200   20.0500  148.1300      10.7        60       889        96
VIS    2025250    200200   20.0400  148.0800      11.1        63       885        98
VIS    2025250    200200   20.0600  148.0700      11.2        71       881        99
VIS    2025250    200200   20.0500  148.0500      10.9        74       878        98
VIS    2025250    200200   20.0400  148.0100       8.9        78       841        98
VIS    2025250    200200   20.0400  148.0000       8.8        77       834        98
VIS    2025250    200200   20.0600  147.9600       8.5        86       757        98
VIS    2025250    200200   20.0600  147.9500       8.6        87       757        99
VIS    2025250    200200   20.0400  147.9200       9.7        82       807        99
VIS    2025250    200200   20.0600  147.8900      10.1        87       736        95
VIS    2025250    200200   20.0400  147.8600      10.3        82       701        95
VIS    2025250    200200   20.0400  147.8400      10.5        68       731        92
VIS    2025250    200200   20.0600  147.8300      10.6        75       747        95
VIS    2025250    200200   20.0400  147.8000      10.4        75       751        96
VIS    2025250    200200   20.0400  147.7700      10.3        84       742        99
VIS    2025250    200200   20.0500  147.7300      10.1        85       714        98
VIS    2025250    200200   20.0400  147.7300      10.1        85       714        98
VIS    2025250    200200   20.0400  147.7000      10.0        85       717        97
VIS    2025250    200200   20.0300  147.6700      10.9        72       735        93
VIS    2025250    200200   20.0500  147.6200      14.6        58       958        98
VIS    2025250    200200   20.0500  147.5800      14.7        58       974        97
VIS    2025250    200200   20.0300  147.5500      13.6        61       974        96
VIS    2025250    200200   20.0500  147.5200      11.3        71       951        92
VIS    2025250    200200   20.0400  147.4900      12.3        74       939        93
VIS    2025250    200200   20.0500  147.4700      11.3        79       934        90
VIS    2025250    200200   20.0400  147.4400      11.8        61       947        99
VIS    2025250    200200   20.0500  147.4100      13.2        61       952        99
VIS    2025250    200200   20.0500  147.4000      13.3        61       946        99
VIS    2025250    200200   20.0400  147.3600      13.7        60       925        97
VIS    2025250    200200   20.0400  147.3400      14.0        61       925        97
VIS    2025250    200200   20.0300  147.3100      13.6        64       914        98
VIS    2025250    200200   20.0300  147.2900      12.4        69       904        98
VIS    2025250    200200   20.0500  147.2800      11.9        71       904        97
VIS    2025250    200200   20.0500  147.1500      13.2        60       957        94
VIS    2025250    200200   20.0400  147.0200      15.2        61       969        96
VIS    2025250    200200   20.0300  146.8600      16.8        62       971        98
VIS    2025250    200200   20.0400  146.8500      17.1        64       982        96
VIS    2025250    200200   20.0400  146.8200      16.9        68       953        97
VIS    2025250    200200   20.0600  150.8600       6.9        78       995        95
VIS    2025250    200200   20.0600  150.3900       7.7        82       929        95
VIS    2025250    200200   20.0600  150.3300       7.2        66       919        96
VIS    2025250    200200   20.0300  149.3400       9.4        57       983        91
VIS    2025250    200200   20.0300  149.3200       9.2        58       976        91
VIS    2025250    200200   20.0300  149.3100       9.1        55       976        92
VIS    2025250    200200   20.0500  149.2700       9.1        51       964        91
VIS    2025250    200200   20.0400  149.0900       9.1        68       982        94
VIS    2025250    200200   20.0500  149.0800       9.3        71       982        93
VIS    2025250    200200   20.0300  149.0600       9.1        75       982        91
VIS    2025250    200200   20.0300  149.0300       9.0        72       984        93
VIS    2025250    200200   20.0400  148.9800       9.5        65       984        95
VIS    2025250    200200   20.0400  148.9500       9.5        67       968        95
VIS    2025250    200200   20.0400  148.8300       9.3        65       965        96
VIS    2025250    200200   20.0400  148.7900       9.3        66       973        93
VIS    2025250    200200   20.0200  148.7600       9.3        59       991        96
VIS    2025250    200200   20.0400  148.7200       7.9        70       977        95
VIS    2025250    200200   20.0400  148.6900       8.0        73       896        95
VIS    2025250    200200   20.0400  148.6800       8.4        77       865        97
VIS    2025250    200200   20.0300  148.6400       9.3        71       865       100
VIS    2025250    200200   20.0300  148.6200       9.8        66       879        99
VIS    2025250    200200   20.0200  148.6100       9.8        66       881        99
VIS    2025250    200200   20.0200  148.5700       9.3        66       924        98
VIS    2025250    200200   20.0400  148.5600       8.3        74       910        96
VIS    2025250    200200   20.0400  148.4900       8.9        62       991        98
VIS    2025250    200200   20.0300  148.4700       9.3        68       991        96
VIS    2025250    200200   20.0200  148.4500       9.3        72       990        94
VIS    2025250    200200   20.0400  148.4200       9.9        55       933        99
VIS    2025250    200200   20.0400  148.4100      10.0        52       933        98
VIS    2025250    200200   20.0200  148.3700       9.1        63       932        98
VIS    2025250    200200   20.0300  148.3600       8.9        68       927        98
VIS    2025250    200200   20.0300  148.3300       8.8        67       888        99
VIS    2025250    200200   20.0400  148.3000       8.7        69       855        96
VIS    2025250    200200   20.0400  148.2800       9.0        75       859        99
VIS    2025250    200200   20.0300  148.2600       9.8        79       868        99
VIS    2025250    200200   20.0300  148.2300      10.3        79       871        99
VIS    2025250    200200   20.0300  148.2100      10.1        72       872        99
VIS    2025250    200200   20.0400  148.1900      10.4        65       881        98
VIS    2025250    200200   20.0100  148.1300      11.6        56       879        92
VIS    2025250    200200   20.0200  148.1000      12.3        59       884        92
VIS    2025250    200200   20.0300  148.0500      11.0        66       874        98
VIS    2025250    200200   20.0300  148.0300       9.5        72       868        98
VIS    2025250    200200   20.0200  147.9900       8.3        86       791        98
VIS    2025250    200200   20.0100  147.9800       8.2        87       731        98
VIS    2025250    200200   20.0100  147.9500       8.9        75       791        95
VIS    2025250    200200   20.0100  147.9300      10.7        67       831        95
VIS    2025250    200200   20.0300  147.9100      10.2        74       796        96
VIS    2025250    200200   20.0300  147.8800       9.8        85       708        94
VIS    2025250    200200   20.0100  147.8500      10.3        75       701        93
VIS    2025250    200200   20.0100  147.8200      11.0        60       815        91
VIS    2025250    200200   20.0100  147.8100      11.0        61       815        91
VIS    2025250    200200   20.0100  147.7900      10.6        72       805        95
VIS    2025250    200200   20.0300  147.7400      10.1        82       723        98
VIS    2025250    200200   20.0100  147.7300       9.7        80       719        95
VIS    2025250    200200   20.0100  147.7100       9.4        82       719        95
VIS    2025250    200200   20.0200  147.6700      10.9        71       740        93
VIS    2025250    200200   20.0200  147.6600      11.7        66       748        90
VIS    2025250    200200   20.0200  147.6200      13.5        61       956       100
VIS    2025250    200200   20.0100  147.5800      13.0        61       980       100
VIS    2025250    200200   20.0100  147.5500      13.5        60       975        98
VIS    2025250    200200   20.0300  147.5400      12.7        62       974        95
VIS    2025250    200200   20.0100  147.5100      12.4        68       961        95
VIS    2025250    200200   20.0100  147.4900      13.2        73       937        93
VIS    2025250    200200   20.0100  147.4400      13.6        63       947        99
VIS    2025250    200200   20.0100  147.4200      14.1        62       954       100
VIS    2025250    200200   20.0200  147.4000      13.4        60       937        99
VIS    2025250    200200   20.0100  147.3900      13.3        59       929        98
VIS    2025250    200200   20.0200  147.3500      13.7        59       919        96
VIS    2025250    200200   20.0300  147.3400      14.1        61       919        95
VIS    2025250    200200   20.0100  147.3000      13.7        62       897        97
VIS    2025250    200200   20.0100  147.2700      12.9        65       906        99
VIS    2025250    200200   20.0100  147.2600      12.5        67       906        99
VIS    2025250    200200   20.0200  146.8800      16.6        61       971        98
VIS    2025250    200200   20.0100  146.8600      16.9        61       969        98
VIS    2025250    200200   20.0200  146.8500      16.4        68       879        96
VIS    2025250    200200   20.0100  146.8000      16.4        78       720        90
VIS    2025250    200200   20.0300  150.8400       6.9        80       984        94
VIS    2025250    200200   20.0400  150.8200       6.9        80       989        92
VIS    2025250    200200   20.0100  149.3400       9.1        60       976        90
VIS    2025250    200200   20.0200  149.3200       9.3        58       985        91
VIS    2025250    200200   20.0100  149.2700       9.0        63       976        90
VIS    2025250    200200   20.0100  149.2300       9.3        61      1000        96
VIS    2025250    200200   20.0200  149.0800       9.3        73       982        92
VIS    2025250    200200   20.0200  149.0600       9.1        75       982        91
VIS    2025250    200200   20.0000  149.0100       9.1        69       966        95
VIS    2025250    200200   20.0100  149.0000       9.2        68       974        94
VIS    2025250    200200   20.0000  148.9600       9.7        72       956        93
VIS    2025250    200200   20.0000  148.9400       9.8        73       954        93
VIS    2025250    200200   20.0100  148.7600       9.7        57       991        96
VIS    2025250    200200   20.0000  148.7600       9.6        57       991        95
VIS    2025250    200200   20.0100  148.7300       9.5        57       984        96
VIS    2025250    200200   20.0100  148.7000       8.7        68       932        95
VIS    2025250    200200   20.0000  148.6700       8.9        83       875        96
VIS    2025250    200200   20.0100  148.6400       9.1        79       865        99
VIS    2025250    200200   20.0000  148.6100       8.7        69       874        97
VIS    2025250    200200   20.0000  148.5900       9.1        59       935        95
VIS    2025250    200200   19.9900  148.5800       9.2        58       935        95
VIS    2025250    200200   20.0100  148.4700       9.2        74       991        92
VIS    2025250    200200   20.0100  148.4500       9.0        73       969        93
VIS    2025250    200200   20.0100  148.4100       9.1        59       939        99
VIS    2025250    200200   20.0100  148.4000       9.2        56       935        99
VIS    2025250    200200   20.0100  148.3700       9.0        64       932        98
VIS    2025250    200200   20.0000  148.3400       9.2        65       872        98
VIS    2025250    200200   20.0000  148.3300       9.1        65       869        98
VIS    2025250    200200   19.9900  148.2900       9.9        75       863       100
VIS    2025250    200200   20.0100  148.2800       9.9        78       862       100
VIS    2025250    200200   20.0100  148.2500      10.1        80       868        98
VIS    2025250    200200   20.0100  148.2200      10.3        77       870        99
VIS    2025250    200200   20.0100  148.2000      10.4        72       873        99
VIS    2025250    200200   20.0000  148.1600      10.3        65       876        97
VIS    2025250    200200   20.0100  148.1300      11.7        56       879        91
VIS    2025250    200200   20.0000  148.0400      10.5        70       868        99
VIS    2025250    200200   20.0100  148.0200       9.2        78       866        98
VIS    2025250    200200   20.0000  147.9900       8.1        89       731        99
VIS    2025250    200200   19.9900  147.9800       8.3        87       731        98
VIS    2025250    200200   20.0000  147.9600       8.7        76       791        96
VIS    2025250    200200   20.0000  147.9200      10.9        63       832        92
VIS    2025250    200200   20.0000  147.9000      10.7        66       810        90
VIS    2025250    200200   19.9900  147.8700      10.0        72       735        94
VIS    2025250    200200   19.9900  147.8400      10.9        66       767        91
VIS    2025250    200200   19.9900  147.8300      10.9        64       805        91
VIS    2025250    200200   20.0000  147.8100      11.2        60       815        90
VIS    2025250    200200   20.0100  147.7700      10.8        74       753        95
VIS    2025250    200200   19.9900  147.7500      10.1        77       731        96
VIS    2025250    200200   20.0000  147.7200       9.4        81       719        95
VIS    2025250    200200   19.9800  147.7000       9.6        84       731        97
VIS    2025250    200200   20.0000  147.6600      10.8        71       748        94
VIS    2025250    200200   20.0000  147.6600      11.3        67       829        97
VIS    2025250    200200   20.0000  147.5800      12.7        62       980        99
VIS    2025250    200200   19.9800  147.5400      11.1        73       968        90
VIS    2025250    200200   19.9800  147.4700      11.6        80       930        95
VIS    2025250    200200   19.9900  147.4400      13.6        62       944       100
VIS    2025250    200200   19.9900  147.4100      14.1        61       949        99
VIS    2025250    200200   20.0000  147.4000      13.8        60       947        99
VIS    2025250    200200   20.0000  147.3800      13.5        59       929        98
VIS    2025250    200200   19.9800  147.3500      13.1        62       896        96
VIS    2025250    200200   20.0000  147.3200      13.3        64       888        93
VIS    2025250    200200   20.0000  147.3100      13.1        64       888        96
VIS    2025250    200200   19.9800  147.2800      13.1        62       914        99
VIS    2025250    200200   19.9800  147.2500      12.7        66       925        94
VIS    2025250    200200   19.9800  146.8800      16.4        59       982        97
VIS    2025250    200200   20.0000  146.8500      16.6        66       873        95
VIS    2025250    200200   19.9900  146.8400      16.4        69       873        96
VIS    2025250    200200   20.0100  150.2000       6.6        69       958        90
VIS    2025250    200200   19.9800  149.3000       8.8        70       969        90
VIS    2025250    200200   19.9800  149.2200       9.1        68       987        94
VIS    2025250    200200   19.9900  149.0500       9.5        70       990        91
VIS    2025250    200200   19.9900  149.0300       9.6        70       986        91
VIS    2025250    200200   20.0000  149.0100       9.2        69       966        95
VIS    2025250    200200   19.9900  148.9800       9.4        68       960        95
VIS    2025250    200200   19.9800  148.9100       9.4        67       954        96
VIS    2025250    200200   19.9700  148.8200       9.6        56       991        96
VIS    2025250    200200   19.9800  148.7700       9.5        54       984        97
VIS    2025250    200200   19.9800  148.7500       9.6        57       984        93
VIS    2025250    200200   19.9900  148.7200       9.3        60       977        92
VIS    2025250    200200   19.9700  148.6800       8.9        81       875        98
VIS    2025250    200200   19.9800  148.6700       9.1        83       870        97
VIS    2025250    200200   19.9700  148.6200       7.6        88       870        91
VIS    2025250    200200   19.9900  148.5800       9.2        57       957        96
VIS    2025250    200200   19.9700  148.4500       9.2        80       998        92
VIS    2025250    200200   19.9900  148.4200       9.0        70       939        97
VIS    2025250    200200   19.9800  148.4200       9.0        69       939        98
VIS    2025250    200200   19.9800  148.3900       9.1        67       908        98
VIS    2025250    200200   19.9800  148.3500       9.2        72       872        99
VIS    2025250    200200   19.9800  148.3200       9.7        71       865        99
VIS    2025250    200200   19.9700  148.3000      10.1        72       867        99
VIS    2025250    200200   19.9700  148.2800      10.0        73       867        98
VIS    2025250    200200   19.9700  148.2700       9.7        75       867        93
VIS    2025250    200200   19.9800  148.2300       9.7        77       867        97
VIS    2025250    200200   19.9900  148.2000       9.9        70       870        99
VIS    2025250    200200   19.9800  148.1900       9.6        71       861        99
VIS    2025250    200200   19.9800  148.1500      10.0        68       860        96
VIS    2025250    200200   19.9800  148.1300      11.0        62       876        94
VIS    2025250    200200   19.9600  148.1100      11.5        59       868        95
VIS    2025250    200200   19.9800  148.0900      12.2        59       873        90
VIS    2025250    200200   19.9600  148.0700      11.2        67       859        93
VIS    2025250    200200   19.9600  148.0400      10.1        85       822        99
VIS    2025250    200200   19.9800  148.0000       8.1        88       726        98
VIS    2025250    200200   19.9800  147.9900       8.0        88       731        98
VIS    2025250    200200   19.9700  147.9700       8.9        81       748        96
VIS    2025250    200200   19.9700  147.9200      10.0        71       806        94
VIS    2025250    200200   19.9600  147.9000       9.9        71       751        93
VIS    2025250    200200   19.9600  147.8700      10.5        70       740        93
VIS    2025250    200200   19.9800  147.8500      10.7        69       735        91
VIS    2025250    200200   19.9800  147.8400      10.9        65       767        91
VIS    2025250    200200   19.9600  147.8200      11.2        62       812        90
VIS    2025250    200200   19.9800  147.7800      11.4        69       805        92
VIS    2025250    200200   19.9800  147.7500      10.3        77       745        96
VIS    2025250    200200   19.9800  147.7300       9.3        79       718        95
VIS    2025250    200200   19.9600  147.7000       9.9        75       716        94
VIS    2025250    200200   19.9700  147.6900      10.0        81       731        96
VIS    2025250    200200   19.9600  147.6500      11.2        61       842        96
VIS    2025250    200200   19.9700  147.6400      11.1        62       847        96
VIS    2025250    200200   19.9700  147.5800      12.2        62       968        98
VIS    2025250    200200   19.9600  147.5400      10.7        72       973        90
VIS    2025250    200200   19.9800  147.4700      11.3        81       930        95
VIS    2025250    200200   19.9600  147.4600      11.3        70       930        98
VIS    2025250    200200   19.9600  147.4300      12.9        61       930        99
VIS    2025250    200200   19.9600  147.4200      12.9        61       931        99
VIS    2025250    200200   19.9800  147.3900      13.3        61       929        98
VIS    2025250    200200   19.9800  147.3500      13.0        62       896        97
VIS    2025250    200200   19.9600  147.3300      13.1        63       854        96
VIS    2025250    200200   19.9500  147.3000      13.2        62       867        97
VIS    2025250    200200   19.9700  147.2700      13.0        62       914        99
VIS    2025250    200200   19.9600  147.2600      13.1        62       924        98
VIS    2025250    200200   19.9500  147.1700      14.7        54       979        95
VIS    2025250    200200   19.9600  146.9200      16.5        58       996        97
VIS    2025250    200200   19.9700  146.8800      16.5        60       978        98
VIS    2025250    200200   19.9500  146.8700      16.5        61       977        98
VIS    2025250    200200   19.9500  146.8300      16.5        69       899        97
VIS    2025250    200200   19.9700  149.3000       8.8        71       958        90
VIS    2025250    200200   19.9600  149.2500       9.1        71       969        93
VIS    2025250    200200   19.9600  149.2200       9.0        70       986        94
VIS    2025250    200200   19.9500  149.2000       8.8        69       986        94
VIS    2025250    200200   19.9500  149.0500      10.0        70       983        91
VIS    2025250    200200   19.9600  148.9900       9.4        61       983        97
VIS    2025250    200200   19.9500  148.9200       9.2        64       993        95
VIS    2025250    200200   19.9700  148.8000       9.5        53       984        94
VIS    2025250    200200   19.9600  148.7700       9.4        54       984        95
VIS    2025250    200200   19.9600  148.6800       8.7        76       881        99
VIS    2025250    200200   19.9500  148.6600       8.8        83       869        98
VIS    2025250    200200   19.9500  148.6200       8.0        92       869        94
VIS    2025250    200200   19.9500  148.5900       8.0        82       904        90
VIS    2025250    200200   19.9500  148.5600       8.5        71       963        93
VIS    2025250    200200   19.9500  148.5400       8.0        74       966        92
VIS    2025250    200200   19.9600  148.4400       9.2        79       998        92
VIS    2025250    200200   19.9600  148.4300       9.1        75       968        94
VIS    2025250    200200   19.9600  148.3900       9.0        71       908        98
VIS    2025250    200200   19.9600  148.3800       9.3        72       905        98
VIS    2025250    200200   19.9400  148.3400       9.4        80       871        99
VIS    2025250    200200   19.9400  148.3200       9.7        79       866       100
VIS    2025250    200200   19.9600  148.2900      10.1        70       867        99
VIS    2025250    200200   19.9500  148.2800      10.2        70       867        97
VIS    2025250    200200   19.9400  148.2400       9.9        80       861        98
VIS    2025250    200200   19.9600  148.2200       8.9        80       861        97
VIS    2025250    200200   19.9600  148.2000       8.8        74       861        98
VIS    2025250    200200   19.9500  148.1700       9.4        73       859        99
VIS    2025250    200200   19.9500  148.1500       9.6        72       857        98
VIS    2025250    200200   19.9600  148.1300      10.3        68       857        98
VIS    2025250    200200   19.9500  148.1100      11.2        57       859        93
VIS    2025250    200200   19.9600  148.0800      11.3        62       859        91
VIS    2025250    200200   19.9400  148.0400      10.0        84       777        99
VIS    2025250    200200   19.9400  148.0200       9.0        86       725        99
VIS    2025250    200200   19.9500  148.0100       8.7        87       725        99
VIS    2025250    200200   19.9600  147.9900       8.1        84       725        96
VIS    2025250    200200   19.9600  147.9600       9.1        79       806        97
VIS    2025250    200200   19.9600  147.9300       9.8        73       806        96
VIS    2025250    200200   19.9500  147.9100      10.0        73       799        95
VIS    2025250    200200   19.9500  147.8400      10.3        64       796        91
VIS    2025250    200200   19.9500  147.8400      10.2        65       796        92
VIS    2025250    200200   19.9400  147.8100      10.2        66       779        92
VIS    2025250    200200   19.9600  147.7900      11.3        68       805        92
VIS    2025250    200200   19.9400  147.7600       9.6        81       764        97
VIS    2025250    200200   19.9400  147.7300       9.6        80       718        93
VIS    2025250    200200   19.9500  147.7000      10.4        73       731        94
VIS    2025250    200200   19.9300  147.6800      11.5        64       801        93
VIS    2025250    200200   19.9500  147.6200      12.2        57       937        95
VIS    2025250    200200   19.9500  147.5700      12.9        58       989        98
VIS    2025250    200200   19.9500  147.5000      11.2        73       956        95
VIS    2025250    200200   19.9300  147.4700      12.2        62       959        99
VIS    2025250    200200   19.9300  147.4700      12.3        63       959       100
VIS    2025250    200200   19.9500  147.4200      12.5        61       925        98
VIS    2025250    200200   19.9500  147.4200      12.5        61       925        98
VIS    2025250    200200   19.9300  147.3900      12.4        63       924        99
VIS    2025250    200200   19.9400  147.3500      12.4        63       882        98
VIS    2025250    200200   19.9400  147.3400      12.2        64       867        98
VIS    2025250    200200   19.9500  147.3000      13.1        62       867        97
VIS    2025250    200200   19.9400  147.2900      13.2        62       903        98
VIS    2025250    200200   19.9400  147.1800      13.2        53       979        97
VIS    2025250    200200   19.9500  146.9200      16.2        58       996        97
VIS    2025250    200200   19.9500  146.9100      16.6        59       978        98
VIS    2025250    200200   19.9300  146.8700      16.4        64       957        99
VIS    2025250    200200   19.9400  146.8500      16.5        63       944        98
VIS    2025250    200200   19.9300  146.8200      16.2        64       862        94
VIS    2025250    200200   19.9500  150.6900       5.1        81       980        92
VIS    2025250    200200   19.9500  150.6800       5.3        81       980        92
VIS    2025250    200200   19.9300  149.2800       8.5        77       930        92
VIS    2025250    200200   19.9300  149.2300       9.0        69       967        95
VIS    2025250    200200   19.9300  149.1900       8.5        66       982        96
VIS    2025250    200200   19.9500  148.9900       9.4        59       984        97
VIS    2025250    200200   19.9300  148.9300       9.2        59       995        96
VIS    2025250    200200   19.9300  148.8900       8.9        59       982        96
VIS    2025250    200200   19.9300  148.8800       9.0        59       982        97
VIS    2025250    200200   19.9400  148.8400       9.4        60       991        97
VIS    2025250    200200   19.9200  148.7800       9.5        53       976        90
VIS    2025250    200200   19.9400  148.6900       8.3        71       881        98
VIS    2025250    200200   19.9300  148.6800       8.1        72       880        98
VIS    2025250    200200   19.9200  148.6400       8.7        81       868        98
VIS    2025250    200200   19.9400  148.6200       7.9        91       869        94
VIS    2025250    200200   19.9200  148.5600       8.1        73       959        92
VIS    2025250    200200   19.9200  148.5500       8.4        70       966        94
VIS    2025250    200200   19.9300  148.5200       7.9        75       976        93
VIS    2025250    200200   19.9200  148.5100       8.2        81       976        92
VIS    2025250    200200   19.9200  148.4400       9.0        67       968        97
VIS    2025250    200200   19.9300  148.4300       9.3        68       968        97
VIS    2025250    200200   19.9300  148.3900       9.7        72       894       100
VIS    2025250    200200   19.9400  148.3700       9.5        78       880        99
VIS    2025250    200200   19.9400  148.3400       9.5        81       868        99
VIS    2025250    200200   19.9200  148.3300       9.6        83       871        99
VIS    2025250    200200   19.9200  148.2900      10.3        79       869        99
VIS    2025250    200200   19.9200  148.2700      10.5        78       869        99
VIS    2025250    200200   19.9400  148.2400      10.0        80       861        98
VIS    2025250    200200   19.9400  148.2200       8.9        83       861        97
VIS    2025250    200200   19.9400  148.2000       8.5        82       862        97
VIS    2025250    200200   19.9200  148.1700       9.4        77       861        99
VIS    2025250    200200   19.9100  148.1500       9.6        69       861        98
VIS    2025250    200200   19.9200  148.1200      11.1        50       859        90
VIS    2025250    200200   19.9300  148.1000      11.0        52       859        91
VIS    2025250    200200   19.9300  148.0700      10.1        72       849        92
VIS    2025250    200200   19.9200  148.0400       9.5        85       747        99
VIS    2025250    200200   19.9300  148.0300       9.7        86       726        99
VIS    2025250    200200   19.9300  148.0100       8.4        85       714        99
VIS    2025250    200200   19.9200  147.9800       7.9        77       716        93
VIS    2025250    200200   19.9300  147.9600       8.6        78       806        96
VIS    2025250    200200   19.9300  147.9300       9.5        77       806        98
VIS    2025250    200200   19.9200  147.8900       9.9        79       742        96
VIS    2025250    200200   19.9300  147.8800      10.1        72       742        91
VIS    2025250    200200   19.9200  147.8500      10.1        69       796        91
VIS    2025250    200200   19.9100  147.8100       9.6        71       779        94
VIS    2025250    200200   19.9100  147.8100       9.5        72       779        95
VIS    2025250    200200   19.9300  147.7600       9.6        78       764        97
VIS    2025250    200200   19.9200  147.7600       9.5        79       764        97
VIS    2025250    200200   19.9300  147.7300       9.8        77       723        93
VIS    2025250    200200   19.9300  147.6900      11.4        63       790        92
VIS    2025250    200200   19.9300  147.6200      13.2        54       968        95
VIS    2025250    200200   19.9100  147.5900      13.7        65       984        95
VIS    2025250    200200   19.9100  147.5800      13.8        64       983        95
VIS    2025250    200200   19.9200  147.5600      13.6        56       983        98
VIS    2025250    200200   19.9200  147.5200      12.4        56       973        98
VIS    2025250    200200   19.9300  147.5100      11.6        62       962        96
VIS    2025250    200200   19.9300  147.4700      12.1        61       959        99
VIS    2025250    200200   19.9300  147.4600      12.4        62       934        99
VIS    2025250    200200   19.9100  147.4300      12.1        60       921        98
VIS    2025250    200200   19.9100  147.3900      13.6        61       924        98
VIS    2025250    200200   19.9100  147.3800      13.8        61       921        98
VIS    2025250    200200   19.9100  147.3500      12.8        62       872        97
VIS    2025250    200200   19.9300  147.3400      12.0        65       870        98
VIS    2025250    200200   19.9200  147.3000      12.0        64       888        98
VIS    2025250    200200   19.9200  147.2700      13.8        60       929        96
VIS    2025250    200200   19.9200  147.2600      14.0        59       929        96
VIS    2025250    200200   19.9200  147.2100      13.9        55       940        96
VIS    2025250    200200   19.9100  147.1800      12.4        52       978        98
VIS    2025250    200200   19.9200  147.0400      15.9        56       992        98
VIS    2025250    200200   19.9000  147.0000      15.7        58       981        97
VIS    2025250    200200   19.9100  146.9600      15.5        58       964        99
VIS    2025250    200200   19.9000  146.9400      15.0        56       963        98
VIS    2025250    200200   19.9000  146.9300      15.1        58       963        99
VIS    2025250    200200   19.9100  146.8800      16.6        69       916        98
VIS    2025250    200200   19.9200  146.8800      16.5        67       957        99
VIS    2025250    200200   19.9200  146.8500      16.3        66       916        98
VIS    2025250    200200   19.9200  146.8300      16.2        64       882        95
VIS    2025250    200200   19.9300  150.6900       5.1        82       980        91
VIS    2025250    200200   19.9400  150.6800       5.3        82       980        91
VIS    2025250    200200   19.9300  150.6200       5.9        86       945        91
VIS    2025250    200200   19.9200  149.2300       9.0        67       967        95
VIS    2025250    200200   19.9200  149.2200       8.9        68       959        96
VIS    2025250    200200   19.9000  149.0900       9.1        73       997        92
VIS    2025250    200200   19.9200  149.0200       9.1        61       983        93
VIS    2025250    200200   19.9200  148.9600       9.2        57       992        98
VIS    2025250    200200   19.9200  148.8700       9.0        59       985        98
VIS    2025250    200200   19.9100  148.8300       9.4        61       985        96
VIS    2025250    200200   19.9000  148.8100       9.1        60       985        97
VIS    2025250    200200   19.9200  148.7900       9.3        55       976        93
VIS    2025250    200200   19.9100  148.7000       7.3        69       894        93
VIS    2025250    200200   19.9200  148.6900       7.6        70       882        96
VIS    2025250    200200   19.9100  148.6500       8.5        76       870        99
VIS    2025250    200200   19.9200  148.6400       8.6        80       867        98
VIS    2025250    200200   19.9200  148.6000       7.6        92       872        92
VIS    2025250    200200   19.8900  148.5200       9.1        73       976        94
VIS    2025250    200200   19.8900  148.5200       9.0        75       976        94
VIS    2025250    200200   19.9100  148.4700       7.9        68       985        95
VIS    2025250    200200   19.8900  148.4300       8.7        72       902        97
VIS    2025250    200200   19.9000  148.4200       9.9        64       902       100
VIS    2025250    200200   19.9100  148.3800       9.5        67       887        99
VIS    2025250    200200   19.9100  148.3600       8.9        70       887        99
VIS    2025250    200200   19.9100  148.3500       8.9        74       872        99
VIS    2025250    200200   19.9100  148.3100      10.2        79       871        99
VIS    2025250    200200   19.9000  148.2800      10.5        78       870        99
VIS    2025250    200200   19.8900  148.2600      10.1        78       869       100
VIS    2025250    200200   19.8900  148.2200       9.8        76       864        99
VIS    2025250    200200   19.8900  148.2100      10.0        76       864        99
VIS    2025250    200200   19.9100  148.1900       9.2        83       861        98
VIS    2025250    200200   19.9000  148.1600       9.5        77       861        99
VIS    2025250    200200   19.9100  148.1400       9.7        67       861        97
VIS    2025250    200200   19.9000  148.1200      11.4        57       877        94
VIS    2025250    200200   19.8900  148.0700       9.6        81       832        99
VIS    2025250    200200   19.8900  148.0500       8.7        85       733        99
VIS    2025250    200200   19.9000  148.0300       8.7        86       706        98
VIS    2025250    200200   19.9100  148.0000       8.2        82       705        96
VIS    2025250    200200   19.9100  147.9800       8.0        76       712        93
VIS    2025250    200200   19.9100  147.9600       8.7        73       722        94
VIS    2025250    200200   19.8900  147.9200      10.2        75       737        95
VIS    2025250    200200   19.9100  147.9200      10.1        82       737        98
VIS    2025250    200200   19.8900  147.8900      10.0        81       740        97
VIS    2025250    200200   19.8900  147.8500      10.6        72       746        94
VIS    2025250    200200   19.9000  147.8300      10.3        68       760        92
VIS    2025250    200200   19.9000  147.8200      10.2        69       779        93
VIS    2025250    200200   19.8900  147.7700      10.5        79       824        99
VIS    2025250    200200   19.8900  147.7600      10.2        78       745        97
VIS    2025250    200200   19.9000  147.7500       9.6        79       740        96
VIS    2025250    200200   19.8900  147.7200       9.6        69       730        91
VIS    2025250    200200   19.8800  147.6500      13.0        55       974        97
VIS    2025250    200200   19.8800  147.6000      13.5        63       972        99
VIS    2025250    200200   19.9000  147.5900      13.7        64       972        96
VIS    2025250    200200   19.8900  147.5300      13.4        66       954        97
VIS    2025250    200200   19.8900  147.5200      13.0        70       954        91
VIS    2025250    200200   19.8800  147.4800      11.8        62       935        98
VIS    2025250    200200   19.9000  147.4600      12.4        61       934        99
VIS    2025250    200200   19.8800  147.4300      12.0        60       911        98
VIS    2025250    200200   19.9000  147.4000      12.9        61       919        98
VIS    2025250    200200   19.9000  147.3800      13.9        61       919        96
VIS    2025250    200200   19.8900  147.3700      13.8        61       884        92
VIS    2025250    200200   19.9000  147.3500      12.7        62       868        97
VIS    2025250    200200   19.8800  147.3100      11.9        60       888        97
VIS    2025250    200200   19.8900  147.2800      12.7        62       917        98
VIS    2025250    200200   19.8800  147.2700      13.2        62       929        99
VIS    2025250    200200   19.8800  147.2300      13.4        61       934        96
VIS    2025250    200200   19.8800  147.2200      13.4        61       934        96
VIS    2025250    200200   19.8800  147.2000      13.5        60       963        97
VIS    2025250    200200   19.8900  147.0200      15.7        60       982        97
VIS    2025250    200200   19.8900  147.0000      15.6        61       966        98
VIS    2025250    200200   19.8900  146.9700      15.7        59       965        99
VIS    2025250    200200   19.8800  146.9600      15.6        58       964        99
VIS    2025250    200200   19.8900  146.9200      15.7        58       953        98
VIS    2025250    200200   19.8800  146.9200      16.0        59       944        97
VIS    2025250    200200   19.8800  146.8900      16.4        64       905        96
VIS    2025250    200200   19.9000  146.8500      16.1        71       876        97
VIS    2025250    200200   19.8900  146.8400      16.0        71       873        97
VIS    2025250    200200   19.8800  149.2400       9.0        74       969        92
VIS    2025250    200200   19.8800  149.2100       9.0        72       950        95
VIS    2025250    200200   19.8800  149.1800       8.7        71       958        95
VIS    2025250    200200   19.9000  149.1000       9.3        70       997        93
VIS    2025250    200200   19.8800  149.0700       9.3        72       997        92
VIS    2025250    200200   19.8800  148.8500       9.3        54       985        97
VIS    2025250    200200   19.8900  148.8300       9.3        57       977        98
VIS    2025250    200200   19.8800  148.8100       9.1        55       961        98
VIS    2025250    200200   19.8900  148.7000       7.1        72       894        93
VIS    2025250    200200   19.8800  148.6800       8.0        76       885        97
VIS    2025250    200200   19.8900  148.6600       8.2        76       873        98
VIS    2025250    200200   19.8800  148.6200       8.1        66       868        96
VIS    2025250    200200   19.8700  148.6100       7.6        66       869        90
VIS    2025250    200200   19.8900  148.5900       7.4        88       882        91
VIS    2025250    200200   19.8900  148.5600       8.1        84       912        90
VIS    2025250    200200   19.8900  148.5200       9.1        74       976        94
VIS    2025250    200200   19.8800  148.5100       8.7        75       970        94
VIS    2025250    200200   19.8800  148.4800       8.1        74       969        93
VIS    2025250    200200   19.8700  148.4500       8.2        72       964        95
VIS    2025250    200200   19.8800  148.4400       8.4        74       955        94
VIS    2025250    200200   19.8900  148.4100       9.5        62       902        99
VIS    2025250    200200   19.8700  148.3800       9.4        52       917        96
VIS    2025250    200200   19.8800  148.3600       9.1        56       896        95
VIS    2025250    200200   19.8800  148.3400       9.3        69       872        97
VIS    2025250    200200   19.8800  148.3100      10.4        76       872       100
VIS    2025250    200200   19.8700  148.2800      10.5        76       871       100
VIS    2025250    200200   19.8800  148.2500       9.6        78       864       100
VIS    2025250    200200   19.8700  148.2400       9.5        78       864        99
VIS    2025250    200200   19.8800  148.2200       9.8        76       864        98
VIS    2025250    200200   19.8700  148.1900      10.3        77       861        99
VIS    2025250    200200   19.8700  148.1600      10.3        76       857       100
VIS    2025250    200200   19.8700  148.1300      12.8        65       865        95
VIS    2025250    200200   19.8700  148.1000      12.3        72       870        98
VIS    2025250    200200   19.8700  148.0700       9.3        84       832        99
VIS    2025250    200200   19.8800  148.0500       8.5        86       721        99
VIS    2025250    200200   19.8700  148.0400       8.5        86       721        99
VIS    2025250    200200   19.8800  147.9300      10.2        70       737        93
VIS    2025250    200200   19.8800  147.9200      10.2        73       737        95
VIS    2025250    200200   19.8600  147.8900      10.1        75       744        94
VIS    2025250    200200   19.8700  147.8500      10.7        75       748        95
VIS    2025250    200200   19.8600  147.8200      10.5        72       746        93
VIS    2025250    200200   19.8600  147.8200      10.5        72       746        93
VIS    2025250    200200   19.8700  147.7800      11.3        80       745        96
VIS    2025250    200200   19.8800  147.7700      10.9        79       745        96
VIS    2025250    200200   19.8800  147.7200       9.6        69       734        92
VIS    2025250    200200   19.8700  147.7200       9.8        65       727        90
VIS    2025250    200200   19.8800  147.6400      13.0        55       974        98
VIS    2025250    200200   19.8600  147.6000      12.5        60       963       100
VIS    2025250    200200   19.8600  147.5900      12.8        60       951        99
VIS    2025250    200200   19.8600  147.5700      12.7        59       932        98
VIS    2025250    200200   19.8800  147.5300      13.5        68       954        95
VIS    2025250    200200   19.8700  147.5200      13.2        68       956        98
VIS    2025250    200200   19.8600  147.4700      12.2        58       935        97
VIS    2025250    200200   19.8600  147.4500      12.1        61       904        97
VIS    2025250    200200   19.8700  147.4500      12.0        61       904        98
VIS    2025250    200200   19.8700  147.4100      12.6        59       911        97
VIS    2025250    200200   19.8800  147.3800      13.4        61       916        94
VIS    2025250    200200   19.8600  147.3500      12.2        60       868        96
VIS    2025250    200200   19.8600  147.3300      12.3        56       902        96
VIS    2025250    200200   19.8700  147.3100      12.3        57       902        96
VIS    2025250    200200   19.8700  147.2800      13.6        61       929        98
VIS    2025250    200200   19.8700  147.2500      13.8        61       926        98
VIS    2025250    200200   19.8600  147.2400      14.5        61       926        96
VIS    2025250    200200   19.8700  147.2200      13.3        61       934        94
VIS    2025250    200200   19.8500  147.0200      15.3        60       965        95
VIS    2025250    200200   19.8600  146.9900      15.5        63       944        98
VIS    2025250    200200   19.8700  146.9700      15.6        59       964        99
VIS    2025250    200200   19.8700  146.9300      15.5        58       953        98
VIS    2025250    200200   19.8700  146.9300      15.6        59       953        99
VIS    2025250    200200   19.8500  146.8800      15.9        63       879        95
VIS    2025250    200200   19.8600  146.8600      15.4        68       861        96
VIS    2025250    200200   19.8600  146.8500      15.2        69       840        96
VIS    2025250    200200   19.8800  151.1800       6.5        84       994        92
VIS    2025250    200200   19.8800  151.1700       6.4        84       994        93
VIS    2025250    200200   19.8700  149.2200       8.9        72       950        95
VIS    2025250    200200   19.8600  149.2200       9.0        72       950        95
VIS    2025250    200200   19.8500  149.1800       8.5        68       941        97
VIS    2025250    200200   19.8500  149.1700       8.5        67       959        96
VIS    2025250    200200   19.8500  148.8500       9.7        53       977        96
VIS    2025250    200200   19.8600  148.8100       9.4        55       961        98
VIS    2025250    200200   19.8700  148.8100       9.3        55       961        98
VIS    2025250    200200   19.8600  148.7800       9.5        57       978        94
VIS    2025250    200200   19.8600  148.7400       7.2        47       985        94
VIS    2025250    200200   19.8500  148.7100       7.8        61       932        96
VIS    2025250    200200   19.8500  148.7000       8.4        67       900        97
VIS    2025250    200200   19.8500  148.6600       8.9        79       888        97
VIS    2025250    200200   19.8500  148.6400       8.2        81       879        97
VIS    2025250    200200   19.8700  148.6200       7.8        67       869        96
VIS    2025250    200200   19.8700  148.6000       7.6        69       878        92
VIS    2025250    200200   19.8500  148.5800       8.2        81       882        97
VIS    2025250    200200   19.8500  148.5100       8.1        72       979        93
VIS    2025250    200200   19.8500  148.5000       8.0        72       979        94
VIS    2025250    200200   19.8600  148.4700       8.0        73       963        94
VIS    2025250    200200   19.8400  148.4500       9.0        73       955        95
VIS    2025250    200200   19.8500  148.4200       8.1        69       914        96
VIS    2025250    200200   19.8500  148.3900       8.2        61       929        96
VIS    2025250    200200   19.8600  148.3800       9.3        53       925        95
VIS    2025250    200200   19.8500  148.3600       9.1        60       895        94
VIS    2025250    200200   19.8400  148.3100       9.9        80       872        99
VIS    2025250    200200   19.8400  148.3000      10.0        80       872        99
VIS    2025250    200200   19.8500  148.2700      10.4        76       877        99
VIS    2025250    200200   19.8600  148.2400       9.8        77       864        99
VIS    2025250    200200   19.8400  148.2100      10.1        72       865        98
VIS    2025250    200200   19.8600  148.2000      10.5        78       861        99
VIS    2025250    200200   19.8400  148.1600      11.4        79       855       100
VIS    2025250    200200   19.8400  148.1500      11.8        83       857        99
VIS    2025250    200200   19.8400  148.1100      12.4        84       867        97
VIS    2025250    200200   19.8400  148.0800       9.9        83       846        99
VIS    2025250    200200   19.8400  148.0700       9.3        84       829        99
VIS    2025250    200200   19.8500  148.0600       8.6        85       733        99
VIS    2025250    200200   19.8400  147.9000      10.0        63       764        90
VIS    2025250    200200   19.8400  147.8600      10.2        78       746        97
VIS    2025250    200200   19.8400  147.8400      10.3        77       740        95
VIS    2025250    200200   19.8400  147.8300      10.1        76       740        93
VIS    2025250    200200   19.8400  147.8100      10.1        76       722        90
VIS    2025250    200200   19.8500  147.7600      11.8        75       738        92
VIS    2025250    200200   19.8600  147.7600      11.6        74       743        93
VIS    2025250    200200   19.8400  147.6400      12.2        53       995        99
VIS    2025250    200200   19.8400  147.6100      12.3        57       973       100
VIS    2025250    200200   19.8500  147.6100      12.5        58       973       100
VIS    2025250    200200   19.8500  147.5600      12.8        59       932        98
VIS    2025250    200200   19.8500  147.5600      13.1        59       932        98
VIS    2025250    200200   19.8500  147.5300      14.2        61       940        97
VIS    2025250    200200   19.8500  147.4900      12.2        57       949        98
VIS    2025250    200200   19.8400  147.4700      12.4        58       949        98
VIS    2025250    200200   19.8400  147.4400      11.5        64       902        97
VIS    2025250    200200   19.8400  147.4100      11.6        63       881        97
VIS    2025250    200200   19.8500  147.3900      12.3        60       881        96
VIS    2025250    200200   19.8500  147.3800      12.4        60       878        94
VIS    2025250    200200   19.8300  147.3400      12.5        60       887        97
VIS    2025250    200200   19.8300  147.3300      12.5        59       893        97
VIS    2025250    200200   19.8300  147.3000      13.6        59       939        97
VIS    2025250    200200   19.8300  147.2600      15.0        59       916        96
VIS    2025250    200200   19.8400  147.2500      14.7        61       916        96
VIS    2025250    200200   19.8500  147.2400      14.7        60       926        94
VIS    2025250    200200   19.8300  147.1900      13.6        60       936        97
VIS    2025250    200200   19.8400  147.0200      15.3        56       966        99
VIS    2025250    200200   19.8300  147.0000      15.1        58       932        97
VIS    2025250    200200   19.8300  146.9800      15.3        67       931        99
VIS    2025250    200200   19.8300  146.9500      15.7        71       931        97
VIS    2025250    200200   19.8300  146.9400      15.7        70       944        98
VIS    2025250    200200   19.8500  146.9000      15.9        64       905        97
VIS    2025250    200200   19.8500  146.8800      15.7        64       873        95
VIS    2025250    200200   19.8500  146.8600      14.7        69       840        96
VIS    2025250    200200   19.8800  151.2000       6.3        83       994        94
VIS    2025250    200200   19.8800  151.1900       6.5        84       994        93
VIS    2025250    200200   19.8500  151.1500       5.5        73       988        98
VIS    2025250    200200   19.8400  149.4900       8.9        71       962        90
VIS    2025250    200200   19.8300  149.4700       8.7        68       962        90
VIS    2025250    200200   19.8300  149.3100       9.1        69       929        95
VIS    2025250    200200   19.8500  149.3000       9.8        73       928        92
VIS    2025250    200200   19.8500  149.2800       9.7        76       923        92
VIS    2025250    200200   19.8300  149.2500       9.3        74       931        92
VIS    2025250    200200   19.8300  149.2100       9.1        69       932        98
VIS    2025250    200200   19.8300  149.2000       8.7        67       931        99
VIS    2025250    200200   19.8400  149.1600       8.5        65       941        98
VIS    2025250    200200   19.8300  149.1300       9.4        58       988        97
VIS    2025250    200200   19.8300  149.1000       9.2        73       990        91
VIS    2025250    200200   19.8300  148.7500       8.4        61       976        98
VIS    2025250    200200   19.8400  148.7100       8.1        62       932        96
VIS    2025250    200200   19.8400  148.6900       8.8        66       918        98
VIS    2025250    200200   19.8200  148.6700       9.3        65       900        99
VIS    2025250    200200   19.8200  148.6400       8.4        76       898        97
VIS    2025250    200200   19.8300  148.6300       8.3        79       898        96
VIS    2025250    200200   19.8400  148.5800       8.6        73       882        99
VIS    2025250    200200   19.8300  148.5000       8.0        73       979        93
VIS    2025250    200200   19.8200  148.4800       9.4        79       990        92
VIS    2025250    200200   19.8400  148.4500       9.2        71       955        96
VIS    2025250    200200   19.8200  148.4100       8.4        71       893        98
VIS    2025250    200200   19.8300  148.3900       8.5        62       929        97
VIS    2025250    200200   19.8200  148.3600       9.0        67       898        98
VIS    2025250    200200   19.8200  148.3500       9.4        69       874        99
VIS    2025250    200200   19.8300  148.3100       9.9        82       867        98
VIS    2025250    200200   19.8400  148.3000      10.0        81       873        99
VIS    2025250    200200   19.8400  148.2700      10.2        75       877        99
VIS    2025250    200200   19.8400  148.2500      10.1        69       873        99
VIS    2025250    200200   19.8400  148.2100      10.1        70       868        98
VIS    2025250    200200   19.8300  148.2000      10.2        70       865        98
VIS    2025250    200200   19.8200  148.1700      10.4        81       859        99
VIS    2025250    200200   19.8300  148.1400      12.2        86       859        96
VIS    2025250    200200   19.8300  148.1200      12.4        85       865        96
VIS    2025250    200200   19.8300  148.0800       9.7        84       846        99
VIS    2025250    200200   19.8100  148.0600       8.4        86       713        99
VIS    2025250    200200   19.8300  148.0400       8.5        85       701        98
VIS    2025250    200200   19.8100  148.0100       9.1        79       710        96
VIS    2025250    200200   19.8100  148.0000       9.3        78       710        95
VIS    2025250    200200   19.8300  147.8800       9.5        76       754        96
VIS    2025250    200200   19.8300  147.8700       9.9        77       754        97
VIS    2025250    200200   19.8300  147.8500      10.1        78       740        96
VIS    2025250    200200   19.8200  147.8300      10.0        73       722        90
VIS    2025250    200200   19.8300  147.7700      11.4        76       716        92
VIS    2025250    200200   19.8100  147.6600      11.4        51       949        94
VIS    2025250    200200   19.8100  147.6500      11.3        51       962        96
VIS    2025250    200200   19.8300  147.6300      12.1        55       982        99
VIS    2025250    200200   19.8300  147.6000      12.0        59       954        99
VIS    2025250    200200   19.8300  147.5700      12.1        60       929        98
VIS    2025250    200200   19.8100  147.5500      12.8        58       934        98
VIS    2025250    200200   19.8100  147.5300      13.2        53       952        98
VIS    2025250    200200   19.8100  147.4800      12.2        59       967        99
VIS    2025250    200200   19.8100  147.4600      11.4        62       935        98
VIS    2025250    200200   19.8100  147.4200      10.6        72       881        98
VIS    2025250    200200   19.8100  147.3900      11.8        65       881        99
VIS    2025250    200200   19.8200  147.3600      12.8        59       875        96
VIS    2025250    200200   19.8200  147.3400      12.7        60       893        97
VIS    2025250    200200   19.8200  147.3300      12.6        60       932        99
VIS    2025250    200200   19.8200  147.2900      14.6        60       927        96
VIS    2025250    200200   19.8200  147.2800      14.8        59       919        96
VIS    2025250    200200   19.8200  147.2500      15.8        58       915        94
VIS    2025250    200200   19.8100  147.2300      15.3        58       913        94
VIS    2025250    200200   19.8200  147.2000      13.5        58       934        97
VIS    2025250    200200   19.8000  147.0200      15.0        55       973        99
VIS    2025250    200200   19.8200  147.0000      15.0        59       932        97
VIS    2025250    200200   19.8200  146.9700      15.3        69       926        98
VIS    2025250    200200   19.8200  146.9600      15.4        70       921        98
VIS    2025250    200200   19.8200  146.9300      15.1        68       923        99
VIS    2025250    200200   19.8200  146.9000      14.7        65       905        98
VIS    2025250    200200   19.8500  151.1500       5.5        73       988        98
VIS    2025250    200200   19.8300  149.4700       8.7        68       962        90
VIS    2025250    200200   19.8000  149.3100       8.9        67       921        97
VIS    2025250    200200   19.8100  149.2900       9.1        69       921        96
VIS    2025250    200200   19.8200  149.2700       9.3        73       925        93
VIS    2025250    200200   19.8100  149.2500       9.4        72       938        91
VIS    2025250    200200   19.8000  149.2200       8.9        66       956        96
VIS    2025250    200200   19.8200  149.2000       8.6        66       931        99
VIS    2025250    200200   19.8000  149.1600       9.2        59       945        97
VIS    2025250    200200   19.8200  149.1300       9.2        58       991        97
VIS    2025250    200200   19.8200  149.0900       9.3        73       974        92
VIS    2025250    200200   19.8000  148.8700       9.7        57       997        95
VIS    2025250    200200   19.8200  148.8500       9.9        57       999        96
VIS    2025250    200200   19.8100  148.7500       8.9        58       967        99
VIS    2025250    200200   19.8100  148.7100       9.3        59       960        98
VIS    2025250    200200   19.8000  148.7000       9.9        58       960        99
VIS    2025250    200200   19.8200  148.6700       9.0        64       900        98
VIS    2025250    200200   19.8200  148.6500       8.3        71       898        96
VIS    2025250    200200   19.8000  148.6200       8.5        75       912        97
VIS    2025250    200200   19.7900  148.5800       9.0        72       904        98
VIS    2025250    200200   19.8100  148.4900       9.0        79       990        92
VIS    2025250    200200   19.8000  148.4600      10.0        70       951        96
VIS    2025250    200200   19.8100  148.4500       9.9        70       949        96
VIS    2025250    200200   19.8100  148.4200       8.9        66       889        96
VIS    2025250    200200   19.7900  148.3900       8.5        71       886        99
VIS    2025250    200200   19.8100  148.3600       9.0        67       898        98
VIS    2025250    200200   19.7900  148.3500       9.5        66       874        98
VIS    2025250    200200   19.8000  148.3200       9.5        72       863       100
VIS    2025250    200200   19.7900  148.3000       9.1        71       863        99
VIS    2025250    200200   19.7900  148.2600      10.2        78       887        99
VIS    2025250    200200   19.8000  148.2300      10.3        65       889        99
VIS    2025250    200200   19.8100  148.2100      10.0        61       870        96
VIS    2025250    200200   19.8100  148.2000       9.8        60       870        96
VIS    2025250    200200   19.8000  148.1700       9.5        80       864        98
VIS    2025250    200200   19.8000  148.1400      11.2        89       865        96
VIS    2025250    200200   19.7900  148.1100      10.7        86       865        98
VIS    2025250    200200   19.7900  148.0800       8.6        88       746        99
VIS    2025250    200200   19.8100  148.0600       8.4        86       738        99
VIS    2025250    200200   19.7900  148.0500       8.6        87       713        99
VIS    2025250    200200   19.8000  148.0200       8.9        82       710        98
VIS    2025250    200200   19.8100  148.0000       9.5        75       710        94
VIS    2025250    200200   19.8000  147.9400       9.6        64       760        90
VIS    2025250    200200   19.8000  147.9100       9.2        77       770        95
VIS    2025250    200200   19.8000  147.8900       9.4        81       754        97
VIS    2025250    200200   19.8100  147.8600      10.1        76       740        95
VIS    2025250    200200   19.8100  147.8500      10.2        75       736        94
VIS    2025250    200200   19.8000  147.6800      12.3        48       871        91
VIS    2025250    200200   19.7800  147.6600      12.1        53       962        97
VIS    2025250    200200   19.8000  147.6500      11.4        54       962        97
VIS    2025250    200200   19.7900  147.6200      11.6        57       954        97
VIS    2025250    200200   19.7900  147.5800      12.5        59       929        98
VIS    2025250    200200   19.7900  147.5800      12.7        60       929        98
VIS    2025250    200200   19.7900  147.4900      12.3        57       973        99
VIS    2025250    200200   19.7900  147.4800      12.7        58       973       100
VIS    2025250    200200   19.7800  147.4400      11.4        65       925        98
VIS    2025250    200200   19.7800  147.4200      11.0        65       899        98
VIS    2025250    200200   19.7800  147.3900      11.8        60       899        97
VIS    2025250    200200   19.7900  147.3600      12.6        56       916        96
VIS    2025250    200200   19.7800  147.3500      12.6        56       924        96
VIS    2025250    200200   19.8000  147.3300      12.4        61       932        99
VIS    2025250    200200   19.7800  147.2800      14.9        60       899        95
VIS    2025250    200200   19.7800  147.2800      15.4        59       899        94
VIS    2025250    200200   19.7900  147.2500      15.6        58       899        93
VIS    2025250    200200   19.8000  147.2300      15.0        57       913        94
VIS    2025250    200200   19.7800  147.1400      15.1        57       991        97
VIS    2025250    200200   19.7800  147.1300      15.2        57       991        97
VIS    2025250    200200   19.8000  147.0500      14.8        57       982        96
VIS    2025250    200200   19.8000  146.9800      15.2        65       927        99
VIS    2025250    200200   19.7800  146.9700      14.8        63       921        98
VIS    2025250    200200   19.7800  146.9300      14.4        59       894        93
VIS    2025250    200200   19.8000  149.3100       8.9        67       921        97
VIS    2025250    200200   19.7900  149.2800       8.8        65       910        97
VIS    2025250    200200   19.7800  149.2700       8.8        63       910        92
VIS    2025250    200200   19.7900  149.2300       8.6        62       962        96
VIS    2025250    200200   19.7900  149.2200       8.5        62       962        97
VIS    2025250    200200   19.7900  149.1800       8.5        58       945        97
VIS    2025250    200200   19.8000  149.1700       9.1        59       945        96
VIS    2025250    200200   19.7900  149.1500       9.9        57       945        92
VIS    2025250    200200   19.7800  149.1100       8.9        61       982        97
VIS    2025250    200200   19.7800  148.8500       9.6        55       997        96
VIS    2025250    200200   19.7900  148.7300       9.9        56       977        98
VIS    2025250    200200   19.7900  148.7000      10.5        56       962        99
VIS    2025250    200200   19.7800  148.7000      10.5        55       962        99
VIS    2025250    200200   19.7800  148.6500       7.8        55       913        93
VIS    2025250    200200   19.7800  148.6500       7.7        58       925        91
VIS    2025250    200200   19.7700  148.6200       7.8        69       918        94
VIS    2025250    200200   19.7700  148.5700       8.7        81       922        94
VIS    2025250    200200   19.7700  148.5300       8.4        79       955        92
VIS    2025250    200200   19.7700  148.5200       8.4        78       955        92
VIS    2025250    200200   19.7900  148.4800       9.3        79       990        92
VIS    2025250    200200   19.7900  148.4500      10.1        71       951        95
VIS    2025250    200200   19.7700  148.4300       9.8        72       924        98
VIS    2025250    200200   19.7700  148.4100       9.3        71       886       100
VIS    2025250    200200   19.7900  148.3800       8.5        71       886        99
VIS    2025250    200200   19.7700  148.3700       9.2        65       886        99
VIS    2025250    200200   19.7900  148.3400       9.7        65       874        98
VIS    2025250    200200   19.7700  148.3100       9.3        60       858        95
VIS    2025250    200200   19.7700  148.2900       9.0        65       863        97
VIS    2025250    200200   19.7700  148.2600      10.2        65       885        99
VIS    2025250    200200   19.7900  148.2300      10.5        69       902       100
VIS    2025250    200200   19.7800  148.2100      10.0        62       889        98
VIS    2025250    200200   19.7700  148.1900       9.4        58       874        95
VIS    2025250    200200   19.7800  148.1600       9.4        80       865        97
VIS    2025250    200200   19.7800  148.1500      10.3        85       866        98
VIS    2025250    200200   19.7600  148.1100      10.3        78       868        98
VIS    2025250    200200   19.7700  148.0800       8.5        84       752        98
VIS    2025250    200200   19.7700  148.0700       8.4        83       745        97
VIS    2025250    200200   19.7800  148.0500       8.8        88       713        99
VIS    2025250    200200   19.7700  148.0000       9.2        76       722        96
VIS    2025250    200200   19.7700  147.9800       9.3        68       743        93
VIS    2025250    200200   19.7600  147.9300       9.0        79       767        97
VIS    2025250    200200   19.7800  147.9200       8.9        80       767        97
VIS    2025250    200200   19.7600  147.8800       9.3        82       716        97
VIS    2025250    200200   19.7700  147.8500       9.7        79       709        95
VIS    2025250    200200   19.7700  147.8400      10.3        76       712        93
VIS    2025250    200200   19.7700  147.6900      12.7        53       942        96
VIS    2025250    200200   19.7700  147.6800      12.6        52       954        96
VIS    2025250    200200   19.7700  147.6300      12.0        55       962        98
VIS    2025250    200200   19.7800  147.6200      11.9        57       954        98
VIS    2025250    200200   19.7600  147.5900      12.9        55       925        96
VIS    2025250    200200   19.7700  147.5500      12.7        60       952        97
VIS    2025250    200200   19.7600  147.5100      12.2        60       965        99
VIS    2025250    200200   19.7700  147.5000      11.9        58       961        99
VIS    2025250    200200   19.7800  147.4700      12.7        57       971        99
VIS    2025250    200200   19.7800  147.4500      11.8        61       948        99
VIS    2025250    200200   19.7700  147.4200      11.8        60       899        97
VIS    2025250    200200   19.7800  147.3900      12.0        58       899        96
VIS    2025250    200200   19.7600  147.3800      12.7        53       924        98
VIS    2025250    200200   19.7700  147.3300      11.5        58       912        96
VIS    2025250    200200   19.7600  147.3100      12.6        60       894        97
VIS    2025250    200200   19.7700  147.3000      13.0        60       897        97
VIS    2025250    200200   19.7600  147.2800      15.3        59       897        94
VIS    2025250    200200   19.7600  147.2500      15.8        59       899        97
VIS    2025250    200200   19.7700  147.2300      14.6        58       923        95
VIS    2025250    200200   19.7700  147.2000      13.2        56       931        95
VIS    2025250    200200   19.7600  147.1600      13.6        54       967        99
VIS    2025250    200200   19.7600  147.1300      14.5        56       985        96
VIS    2025250    200200   19.7700  147.1300      15.0        57       991        97
VIS    2025250    200200   19.7500  147.1000      14.4        56       979        99
VIS    2025250    200200   19.7500  147.0700      14.4        56       981       100
VIS    2025250    200200   19.7600  147.0400      14.8        58       975       100
VIS    2025250    200200   19.7700  147.0100      14.9        57       963        99
VIS    2025250    200200   19.7600  147.0100      14.9        55       957        97
VIS    2025250    200200   19.7600  146.9800      14.8        56       934        95
VIS    2025250    200200   19.7700  146.9400      14.4        60       894        94
VIS    2025250    200200   19.7500  146.9300      14.5        57       828        90
VIS    2025250    200200   19.7500  149.2900       9.3        65       929        94
VIS    2025250    200200   19.7600  149.2600       8.8        56       929        92
VIS    2025250    200200   19.7500  149.2600       8.7        54       932        90
VIS    2025250    200200   19.7500  149.2300       8.6        51       951        99
VIS    2025250    200200   19.7600  149.1900       8.6        59       980        95
VIS    2025250    200200   19.7700  149.1700       8.8        57       974        95
VIS    2025250    200200   19.7500  149.1400       8.8        62       992        93
VIS    2025250    200200   19.7600  149.1300       8.8        63       992        93
VIS    2025250    200200   19.7700  149.1000       9.0        64       977        96
VIS    2025250    200200   19.7500  148.6800       9.9        53       960       100
VIS    2025250    200200   19.7600  148.6800       9.6        54       960       100
VIS    2025250    200200   19.7700  148.6500       8.0        59       930        92
VIS    2025250    200200   19.7700  148.6100       8.4        73       918        96
VIS    2025250    200200   19.7500  148.5900       8.5        81       899        96
VIS    2025250    200200   19.7400  148.5800       8.6        81       912        93
VIS    2025250    200200   19.7500  148.5300       8.1        78       953        93
VIS    2025250    200200   19.7400  148.5300       8.0        75       955        91
VIS    2025250    200200   19.7400  148.5000       7.9        71       969        91
VIS    2025250    200200   19.7500  148.4600       9.2        75       966        94
VIS    2025250    200200   19.7500  148.4500       9.2        73       966        95
VIS    2025250    200200   19.7500  148.4200       9.6        69       887        99
VIS    2025250    200200   19.7500  148.3900       9.2        71       886        99
VIS    2025250    200200   19.7600  148.3700       9.3        67       886        99
VIS    2025250    200200   19.7600  148.3300      10.2        59       867        95
VIS    2025250    200200   19.7400  148.3200      10.4        63       858        99
VIS    2025250    200200   19.7600  148.3000       9.5        61       858        96
VIS    2025250    200200   19.7400  148.2700      10.2        52       884        94
VIS    2025250    200200   19.7600  148.2400      10.7        61       904        98
VIS    2025250    200200   19.7400  148.2100      10.0        58       904        98
VIS    2025250    200200   19.7500  148.2000       9.6        59       889        96
VIS    2025250    200200   19.7400  148.1800       9.8        68       867        96
VIS    2025250    200200   19.7400  148.1400      10.7        73       870        99
VIS    2025250    200200   19.7500  148.1200      10.5        72       870        99
VIS    2025250    200200   19.7400  148.0900       9.5        67       844        97
VIS    2025250    200200   19.7400  148.0700       8.9        70       841        96
VIS    2025250    200200   19.7500  148.0400       9.1        82       752        99
VIS    2025250    200200   19.7400  148.0200      10.0        74       806       100
VIS    2025250    200200   19.7500  147.9800       9.8        71       809        95
VIS    2025250    200200   19.7400  147.9700      10.3        69       809        97
VIS    2025250    200200   19.7500  147.9400       9.4        80       767        98
VIS    2025250    200200   19.7400  147.9100       8.9        82       719        98
VIS    2025250    200200   19.7500  147.8900       9.2        82       701        97
VIS    2025250    200200   19.7500  147.8400      10.1        78       709        95
VIS    2025250    200200   19.7500  147.8300      10.6        74       719        92
VIS    2025250    200200   19.7400  147.6600      12.9        50       975        97
VIS    2025250    200200   19.7400  147.6300      12.8        51       965        97
VIS    2025250    200200   19.7400  147.6300      12.9        52       958        97
VIS    2025250    200200   19.7500  147.6000      13.1        53       925        95
VIS    2025250    200200   19.7500  147.5600      13.0        59       952        96
VIS    2025250    200200   19.7500  147.5100      12.4        60       965        97
VIS    2025250    200200   19.7500  147.5000      12.1        52       959        98
VIS    2025250    200200   19.7500  147.4800      11.8        53       948        97
VIS    2025250    200200   19.7500  147.4400      11.7        58       906        98
VIS    2025250    200200   19.7400  147.4100      12.2        57       906        98
VIS    2025250    200200   19.7300  147.3900      12.7        57       918        99
VIS    2025250    200200   19.7400  147.3600      12.6        57       917        98
VIS    2025250    200200   19.7400  147.3500      12.4        58       914        98
VIS    2025250    200200   19.7500  147.3200      11.5        61       875        99
VIS    2025250    200200   19.7300  147.3000      11.7        60       868        99
VIS    2025250    200200   19.7400  147.2600      14.8        58       897        98
VIS    2025250    200200   19.7400  147.2600      14.7        58       897        98
VIS    2025250    200200   19.7300  147.2300      13.1        60       923        93
VIS    2025250    200200   19.7300  147.1600      12.6        54       976        96
VIS    2025250    200200   19.7500  147.1500      13.1        54       976        99
VIS    2025250    200200   19.7400  147.1300      13.5        54       979        97
VIS    2025250    200200   19.7400  147.0900      14.2        56       978        99
VIS    2025250    200200   19.7300  147.0800      14.3        55       978       100
VIS    2025250    200200   19.7500  147.0500      14.3        59       979        98
VIS    2025250    200200   19.7400  147.0100      14.7        55       957        99
VIS    2025250    200200   19.7400  146.9600      14.6        54       934        95
VIS    2025250    200200   19.7400  146.9600      13.9        56       910        92
VIS    2025250    200200   19.7300  149.3100       9.0        64       964        90
VIS    2025250    200200   19.7400  149.3000       9.2        64       932        94
VIS    2025250    200200   19.7300  149.2700       9.3        59       932        90
VIS    2025250    200200   19.7500  149.2400       8.7        51       947        95
VIS    2025250    200200   19.7400  149.2400       8.8        51       951        98
VIS    2025250    200200   19.7300  149.2000       9.0        57       976        98
VIS    2025250    200200   19.7300  149.1700       8.8        57       984        95
VIS    2025250    200200   19.7300  149.1500       8.9        59       992        94
VIS    2025250    200200   19.7500  149.1300       8.7        63       992        93
VIS    2025250    200200   19.7500  149.1100       8.8        66       982        92
VIS    2025250    200200   19.7200  148.6900      10.4        48       977        99
VIS    2025250    200200   19.7300  148.6800      10.0        49       960       100
VIS    2025250    200200   19.7300  148.6500       9.6        52       956        99
VIS    2025250    200200   19.7400  148.6300       9.0        66       930        95
VIS    2025250    200200   19.7300  148.5900       8.8        77       906        95
VIS    2025250    200200   19.7400  148.5700       8.5        80       922        92
VIS    2025250    200200   19.7200  148.5600       8.5        75       922        94
VIS    2025250    200200   19.7400  148.5200       8.0        72       955        91
VIS    2025250    200200   19.7200  148.5100       7.9        68       969        92
VIS    2025250    200200   19.7300  148.4600       8.4        72       968        91
VIS    2025250    200200   19.7400  148.4400       9.1        72       924        95
VIS    2025250    200200   19.7200  148.4200       9.4        71       894        98
VIS    2025250    200200   19.7400  148.4100       9.4        71       887        99
VIS    2025250    200200   19.7400  148.3700       9.6        73       886        99
VIS    2025250    200200   19.7200  148.3400      10.3        70       870       100
VIS    2025250    200200   19.7400  148.3200      10.6        64       858        99
VIS    2025250    200200   19.7200  148.3100      10.7        69       856       100
VIS    2025250    200200   19.7300  148.2800      10.3        62       854        98
VIS    2025250    200200   19.7300  148.2400      10.5        54       894        98
VIS    2025250    200200   19.7300  148.2300      10.6        54       894        98
VIS    2025250    200200   19.7400  148.2000       9.6        59       889        97
VIS    2025250    200200   19.7300  148.1800      10.1        58       872        96
VIS    2025250    200200   19.7100  148.1500      11.2        65       861        96
VIS    2025250    200200   19.7300  148.1200      10.4        66       870       100
VIS    2025250    200200   19.7100  148.1100      11.1        54       863        97
VIS    2025250    200200   19.7200  148.0800      11.2        56       862        96
VIS    2025250    200200   19.7200  148.0500       9.7        57       844        95
VIS    2025250    200200   19.7100  148.0100      10.6        55       858        97
VIS    2025250    200200   19.7300  148.0000      10.5        65       833        99
VIS    2025250    200200   19.7200  147.9700      11.6        75       837        98
VIS    2025250    200200   19.7200  147.9500      11.4        80       809        97
VIS    2025250    200200   19.7100  147.9200       8.9        80       719        98
VIS    2025250    200200   19.7200  147.8500      10.9        68       715        94
VIS    2025250    200200   19.7100  147.8300      12.2        60       751        90
VIS    2025250    200200   19.7300  147.8100      11.8        63       788        94
VIS    2025250    200200   19.7300  147.7800      11.8        60       801        94
VIS    2025250    200200   19.7200  147.7500      10.4        62       753        91
VIS    2025250    200200   19.7100  147.7200      11.3        57       819        94
VIS    2025250    200200   19.7100  147.7100      11.5        56       830        96
VIS    2025250    200200   19.7100  147.6800      12.8        52       989        99
VIS    2025250    200200   19.7100  147.6400      12.7        58       958        99
VIS    2025250    200200   19.7100  147.6400      12.7        58       958        99
VIS    2025250    200200   19.7200  147.6000      12.6        54       916        98
VIS    2025250    200200   19.7100  147.5600      12.8        56       922        98
VIS    2025250    200200   19.7200  147.5400      12.6        56       956        95
VIS    2025250    200200   19.7200  147.5100      12.7        56       967        92
VIS    2025250    200200   19.7100  147.4700      11.8        56       910        97
VIS    2025250    200200   19.7200  147.4500      11.6        57       898        98
VIS    2025250    200200   19.7100  147.4200      12.4        57       912        99
VIS    2025250    200200   19.7300  147.3900      12.6        57       918        99
VIS    2025250    200200   19.7300  147.3700      12.9        58       918        99
VIS    2025250    200200   19.7200  147.3600      12.7        59       915        99
VIS    2025250    200200   19.7100  147.3200      12.4        59       890        98
VIS    2025250    200200   19.7200  147.3100      11.8        61       876        99
VIS    2025250    200200   19.7000  147.2700      14.9        58       903        98
VIS    2025250    200200   19.7200  147.2600      14.7        57       903        99
VIS    2025250    200200   19.7200  147.2400      13.7        61       923        98
VIS    2025250    200200   19.7200  147.2200      12.6        63       925        93
VIS    2025250    200200   19.7200  147.1900      11.9        61       936        94
VIS    2025250    200200   19.7100  147.1400      13.5        53       979        99
VIS    2025250    200200   19.7200  147.1200      13.8        54       976        99
VIS    2025250    200200   19.7000  147.1100      14.1        55       972        99
VIS    2025250    200200   19.7200  147.0900      14.2        55       976       100
VIS    2025250    200200   19.7100  147.0600      14.7        59       953        99
VIS    2025250    200200   19.7100  147.0200      15.9        68       890       100
VIS    2025250    200200   19.7000  147.0100      16.6        73       844        99
VIS    2025250    200200   19.7000  146.9700      13.1        81       838        98
VIS    2025250    200200   19.7100  146.9500      10.9        69       838        93
VIS    2025250    200200   19.7100  149.3500       8.8        65       955        90
VIS    2025250    200200   19.7100  149.2800       9.4        62       932        92
VIS    2025250    200200   19.7200  149.2600       9.2        58       932        93
VIS    2025250    200200   19.7200  149.1500       9.0        58       992        95
VIS    2025250    200200   19.7000  149.1200       9.4        66       976        91
VIS    2025250    200200   19.7200  149.1100       8.8        69       976        91
VIS    2025250    200200   19.7200  148.7000      10.7        48       977        96
VIS    2025250    200200   19.7000  148.6600      10.5        49       973        98
VIS    2025250    200200   19.7200  148.6600      10.1        50       957       100
VIS    2025250    200200   19.7100  148.6300       9.8        61       939        97
VIS    2025250    200200   19.7100  148.5900       8.9        75       913        95
VIS    2025250    200200   19.7100  148.5600       8.3        74       913        95
VIS    2025250    200200   19.7000  148.5500       8.1        78       944        91
VIS    2025250    200200   19.7100  148.5200       7.6        72       969        91
VIS    2025250    200200   19.7100  148.5100       7.7        68       969        92
VIS    2025250    200200   19.7000  148.4600       7.9        67       912        95
VIS    2025250    200200   19.7000  148.4400       8.3        70       894        96
VIS    2025250    200200   19.7000  148.4300       8.9        74       892        97
VIS    2025250    200200   19.7000  148.4000       9.5        78       885        97
VIS    2025250    200200   19.7000  148.3800       9.6        77       883        97
VIS    2025250    200200   19.7100  148.3400      10.0        71       870       100
VIS    2025250    200200   19.6900  148.3300       9.4        75       870        99
VIS    2025250    200200   19.7100  148.3100      10.6        71       856       100
VIS    2025250    200200   19.7000  148.2800      10.2        69       855        99
VIS    2025250    200200   19.7000  148.2500      10.3        59       891        98
VIS    2025250    200200   19.7100  148.2200      10.8        50       896        97
VIS    2025250    200200   19.7100  148.2000      11.0        51       894        97
VIS    2025250    200200   19.7000  148.1800      11.2        52       885        97
VIS    2025250    200200   19.7000  148.1400      11.7        56       861        97
VIS    2025250    200200   19.6900  148.1200      12.4        50       863        94
VIS    2025250    200200   19.7100  148.1000      11.3        52       863        96
VIS    2025250    200200   19.7000  148.0800      11.8        51       862        93
VIS    2025250    200200   19.7100  148.0400      10.1        51       858        95
VIS    2025250    200200   19.7000  148.0100      10.5        51       853        95
VIS    2025250    200200   19.7000  148.0100      10.5        53       853        95
VIS    2025250    200200   19.7000  147.9700      11.0        71       844       100
VIS    2025250    200200   19.6900  147.9400      10.3        75       837        99
VIS    2025250    200200   19.7100  147.9300      10.1        79       731        99
VIS    2025250    200200   19.7000  147.8600       9.7        70       711        95
VIS    2025250    200200   19.6900  147.8200      12.3        52       842        92
VIS    2025250    200200   19.6900  147.8000      11.9        53       876        96
VIS    2025250    200200   19.7000  147.7800      11.3        56       826        95
VIS    2025250    200200   19.6900  147.7500      10.3        58       803        95
VIS    2025250    200200   19.6900  147.7200      10.7        62       819        97
VIS    2025250    200200   19.6800  147.6800      12.1        60       977        98
VIS    2025250    200200   19.7000  147.6500      13.3        61       977        97
VIS    2025250    200200   19.6800  147.6300      12.8        59       945        97
VIS    2025250    200200   19.7000  147.6100      12.4        59       918        99
VIS    2025250    200200   19.6900  147.5200      12.6        53       933        97
VIS    2025250    200200   19.7000  147.5000      12.5        52       933        97
VIS    2025250    200200   19.6900  147.4900      12.6        55       893        97
VIS    2025250    200200   19.6900  147.4400      12.6        57       893        99
VIS    2025250    200200   19.6800  147.4400      12.7        57       896        99
VIS    2025250    200200   19.7000  147.4000      12.6        58       920        99
VIS    2025250    200200   19.6900  147.3700      12.8        57       910        98
VIS    2025250    200200   19.7000  147.3600      12.8        58       912        98
VIS    2025250    200200   19.7000  147.3300      12.4        59       890        99
VIS    2025250    200200   19.6800  147.3100      13.4        57       890        98
VIS    2025250    200200   19.6900  147.2700      15.0        58       903        98
VIS    2025250    200200   19.6900  147.2600      15.3        58       910        98
VIS    2025250    200200   19.7000  147.2400      14.2        59       928        99
VIS    2025250    200200   19.7000  147.1400      13.8        53       979        99
VIS    2025250    200200   19.6900  147.1200      14.3        54       972       100
VIS    2025250    200200   19.6800  147.0900      14.7        56       940        98
VIS    2025250    200200   19.6800  147.0800      14.7        57       934        98
VIS    2025250    200200   19.7000  147.0500      15.0        64       922        99
VIS    2025250    200200   19.6800  147.0400      15.3        72       844       100
VIS    2025250    200200   19.6900  147.0000      16.6        77       747        94
VIS    2025250    200200   19.6800  146.9800      15.4        78       747        97
VIS    2025250    200200   19.6900  146.9500      10.2        82       759        97
VIS    2025250    200200   19.6800  149.3700       9.0        59       961        91
VIS    2025250    200200   19.7000  149.3500       9.0        64       955        90
VIS    2025250    200200   19.7000  149.3200       9.5        67       939        90
VIS    2025250    200200   19.6900  149.2900       9.7        68       934        90
VIS    2025250    200200   19.6800  149.2500       8.4        56       976        97
VIS    2025250    200200   19.6800  149.2400       8.3        55       982        97
VIS    2025250    200200   19.6900  149.2100       8.8        60       993        93
VIS    2025250    200200   19.7000  149.1800       9.1        56       996        93
VIS    2025250    200200   19.7000  149.1600       9.2        56       996        93
VIS    2025250    200200   19.7000  149.1200       9.5        67       956        92
VIS    2025250    200200   19.6900  149.1100       9.5        65       946        94
VIS    2025250    200200   19.6900  148.7100      11.1        49       999        93
VIS    2025250    200200   19.6800  148.6800      10.6        51       992        96
VIS    2025250    200200   19.6900  148.6700      10.5        49       973        98
VIS    2025250    200200   19.6900  148.6600      10.5        51       957        98
VIS    2025250    200200   19.6700  148.6300       9.7        58       933        95
VIS    2025250    200200   19.6900  148.5900       8.6        77       910        94
VIS    2025250    200200   19.6800  148.5700       7.7        74       908        95
VIS    2025250    200200   19.6800  148.5600       7.4        76       913        93
VIS    2025250    200200   19.6700  148.4800       7.1        78       938        90
VIS    2025250    200200   19.6700  148.4700       7.3        73       894        95
VIS    2025250    200200   19.6700  148.4300       8.5        72       855        98
VIS    2025250    200200   19.6900  148.4300       8.9        74       883        98
VIS    2025250    200200   19.6800  148.4000       9.4        82       883        94
VIS    2025250    200200   19.6800  148.3600       9.2        76       870        98
VIS    2025250    200200   19.6700  148.3500       9.1        76       870        98
VIS    2025250    200200   19.6800  148.3300       9.0        78       875        97
VIS    2025250    200200   19.6800  148.3100       9.2        79       867        97
VIS    2025250    200200   19.6700  148.2800       9.7        71       864        99
VIS    2025250    200200   19.6700  148.2300      10.6        56       912        99
VIS    2025250    200200   19.6800  148.1900      11.3        50       896        98
VIS    2025250    200200   19.6800  148.1700      12.1        43       885        92
VIS    2025250    200200   19.6700  148.1600      12.1        41       865        90
VIS    2025250    200200   19.6800  148.1300      12.7        46       863        92
VIS    2025250    200200   19.6700  148.0900      11.4        50       867        95
VIS    2025250    200200   19.6600  148.0800      11.0        47       867        94
VIS    2025250    200200   19.6800  147.9900      10.5        64       846        99
VIS    2025250    200200   19.6800  147.9700      10.5        69       846       100
VIS    2025250    200200   19.6800  147.9400      10.1        74       839        98
VIS    2025250    200200   19.6600  147.9200       9.5        76       795        97
VIS    2025250    200200   19.6600  147.8900       9.1        82       700        98
VIS    2025250    200200   19.6700  147.8500       9.7        62       754        93
VIS    2025250    200200   19.6800  147.8100      11.8        51       876        96
VIS    2025250    200200   19.6600  147.7900      11.0        52       879        96
VIS    2025250    200200   19.6600  147.7800      10.8        54       878        97
VIS    2025250    200200   19.6600  147.7500      10.3        62       795        94
VIS    2025250    200200   19.6600  147.7100      10.3        70       795        97
VIS    2025250    200200   19.6600  147.7100      10.2        70       795        97
VIS    2025250    200200   19.6600  147.6700      12.2        57       967        99
VIS    2025250    200200   19.6700  147.6500      13.0        57       945        99
VIS    2025250    200200   19.6800  147.6300      12.7        59       939        95
VIS    2025250    200200   19.6800  147.5900      13.1        58       918        99
VIS    2025250    200200   19.6800  147.5800      13.3        57       920        99
VIS    2025250    200200   19.6600  147.4700      13.1        57       869        97
VIS    2025250    200200   19.6700  147.4400      12.6        57       893        99
VIS    2025250    200200   19.6600  147.4300      12.5        57       925        99
VIS    2025250    200200   19.6700  147.4000      13.0        57       918        99
VIS    2025250    200200   19.6700  147.3600      13.3        56       910        98
VIS    2025250    200200   19.6600  147.3600      13.5        55       910        98
VIS    2025250    200200   19.6600  147.3200      13.1        55       907        97
VIS    2025250    200200   19.6700  147.3100      13.3        56       906        98
VIS    2025250    200200   19.6700  147.2700      15.2        57       910        98
VIS    2025250    200200   19.6500  147.2500      14.9        55       928        97
VIS    2025250    200200   19.6500  147.2300      15.2        55       942        97
VIS    2025250    200200   19.6500  147.1400      14.5        53       994        99
VIS    2025250    200200   19.6600  147.1200      14.8        54       959        99
VIS    2025250    200200   19.6600  147.1100      14.8        55       952        99
VIS    2025250    200200   19.6700  147.0800      14.9        57       930        98
VIS    2025250    200200   19.6700  147.0500      15.0        70       892       100
VIS    2025250    200200   19.6700  147.0400      15.3        73       835       100
VIS    2025250    200200   19.6700  147.0100      16.4        77       729        94
VIS    2025250    200200   19.6700  146.9800      15.1        76       729        96
VIS    2025250    200200   19.6500  149.3500       8.6        60       961        92
VIS    2025250    200200   19.6600  149.3100       9.5        66       938        91
VIS    2025250    200200   19.6700  149.2400       8.3        54       976        97
VIS    2025250    200200   19.6700  149.2300       8.4        54       982        97
VIS    2025250    200200   19.6600  149.2000       8.7        54       998        96
VIS    2025250    200200   19.6600  149.1100       9.0        62       971        94
VIS    2025250    200200   19.6600  149.1100       9.0        62       971        94
VIS    2025250    200200   19.6600  149.0800       9.3        61       965        94
VIS    2025250    200200   19.6600  148.7000      10.8        52       992        93
VIS    2025250    200200   19.6500  148.6600      10.2        52       944        99
VIS    2025250    200200   19.6700  148.6500      10.2        52       944        97
VIS    2025250    200200   19.6700  148.6300       9.5        59       927        95
VIS    2025250    200200   19.6600  148.5900       8.0        77       908        94
VIS    2025250    200200   19.6600  148.5600       6.5        79       910        91
VIS    2025250    200200   19.6600  148.5500       6.6        79       910        92
VIS    2025250    200200   19.6500  148.4800       7.3        84       880        93
VIS    2025250    200200   19.6400  148.4800       7.4        83       880        93
VIS    2025250    200200   19.6600  148.4300       8.5        73       855        98
VIS    2025250    200200   19.6500  148.4100       9.5        73       867        99
VIS    2025250    200200   19.6500  148.3900       9.4        73       870        99
VIS    2025250    200200   19.6600  148.3600       9.0        76       869        98
VIS    2025250    200200   19.6600  148.3500       9.2        76       869        98
VIS    2025250    200200   19.6400  148.3100       9.7        77       878        98
VIS    2025250    200200   19.6400  148.2900       9.8        74       867        99
VIS    2025250    200200   19.6600  148.2800       9.9        70       867        98
VIS    2025250    200200   19.6600  148.2300      10.6        60       941        98
VIS    2025250    200200   19.6600  148.2200      10.2        62       941        97
VIS    2025250    200200   19.6400  148.2000       9.3        57       907        97
VIS    2025250    200200   19.6600  148.1700      10.6        49       894        97
VIS    2025250    200200   19.6500  148.1500      10.7        46       867        93
VIS    2025250    200200   19.6600  148.1200      11.9        48       863        93
VIS    2025250    200200   19.6500  148.0800      11.0        47       869        94
VIS    2025250    200200   19.6500  148.0700      10.8        46       871        94
VIS    2025250    200200   19.6500  148.0300      10.0        45       837        91
VIS    2025250    200200   19.6500  147.9800      10.8        58       849        97
VIS    2025250    200200   19.6500  147.9800      10.9        59       850        97
VIS    2025250    200200   19.6500  147.9300      10.1        67       803        97
VIS    2025250    200200   19.6400  147.9300      10.0        66       803        97
VIS    2025250    200200   19.6500  147.8900       9.1        81       723        98
VIS    2025250    200200   19.6500  147.8800       9.1        81       723        98
VIS    2025250    200200   19.6400  147.8400       9.7        63       844        97
VIS    2025250    200200   19.6600  147.8200      10.9        50       879        96
VIS    2025250    200200   19.6500  147.7900      11.1        52       881        97
VIS    2025250    200200   19.6500  147.7800      11.1        54       881        98
VIS    2025250    200200   19.6600  147.7400      10.3        65       789        95
VIS    2025250    200200   19.6500  147.7200      10.1        72       789        97
VIS    2025250    200200   19.6500  147.6100      13.6        57       906        97
VIS    2025250    200200   19.6500  147.6000      14.1        56       914        98
VIS    2025250    200200   19.6400  147.5800      13.8        51       926        98
VIS    2025250    200200   19.6300  147.5500      13.3        49       941        98
VIS    2025250    200200   19.6300  147.5300      12.9        51       963       100
VIS    2025250    200200   19.6500  147.4600      13.0        57       880        98
VIS    2025250    200200   19.6400  147.4600      12.9        56       880        98
VIS    2025250    200200   19.6300  147.4200      12.8        55       926        99
VIS    2025250    200200   19.6400  147.4000      13.2        56       925        99
VIS    2025250    200200   19.6500  147.3700      13.6        56       910        99
VIS    2025250    200200   19.6300  147.3400      13.2        55       915        99
VIS    2025250    200200   19.6400  147.3300      13.3        53       915        98
VIS    2025250    200200   19.6300  147.3000      13.6        54       941        99
VIS    2025250    200200   19.6500  147.2700      14.1        55       920        99
VIS    2025250    200200   19.6300  147.2400      14.6        55       956        98
VIS    2025250    200200   19.6300  147.2300      14.7        55       956        97
VIS    2025250    200200   19.6300  147.1900      15.9        57       918        94
VIS    2025250    200200   19.6400  147.1400      14.5        53       994        99
VIS    2025250    200200   19.6400  147.1200      15.0        54       959        99
VIS    2025250    200200   19.6300  147.0900      15.8        57       945       100
VIS    2025250    200200   19.6300  147.0600      15.9        58       930        99
VIS    2025250    200200   19.6300  147.0600      16.0        58       930        99
VIS    2025250    200200   19.6300  147.0400      15.5        67       842        97
VIS    2025250    200200   19.6400  149.3500       8.5        60       964        92
VIS    2025250    200200   19.6400  149.3200       9.4        66       941        90
VIS    2025250    200200   19.6400  149.3000       9.4        65       944        90
VIS    2025250    200200   19.6500  149.2600       8.6        57       973        91
VIS    2025250    200200   19.6500  149.1300       8.9        61       978        94
VIS    2025250    200200   19.6400  149.1300       8.9        61       977        94
VIS    2025250    200200   19.6400  149.0800       8.2        66       972        91
VIS    2025250    200200   19.6300  149.0800       8.1        67       972        91
VIS    2025250    200200   19.6400  148.6800      10.3        53       982        99
VIS    2025250    200200   19.6400  148.6700      10.3        53       966        99
VIS    2025250    200200   19.6400  148.6400       9.7        58       933        96
VIS    2025250    200200   19.6200  148.6100       8.4        64       928        95
VIS    2025250    200200   19.6200  148.5900       8.2        69       930        95
VIS    2025250    200200   19.6200  148.5700       6.9        78       908        90
VIS    2025250    200200   19.6300  148.5300       6.0        76       917        90
VIS    2025250    200200   19.6200  148.5000       6.4        75       897        92
VIS    2025250    200200   19.6200  148.4800       6.8        76       880        94
VIS    2025250    200200   19.6200  148.4500       7.7        77       845        96
VIS    2025250    200200   19.6200  148.4300       8.1        77       845        97
VIS    2025250    200200   19.6400  148.4100       9.4        69       867        99
VIS    2025250    200200   19.6400  148.4000       9.4        67       869        99
VIS    2025250    200200   19.6300  148.3500       9.5        72       875        99
VIS    2025250    200200   19.6200  148.3500       9.6        73       876        99
VIS    2025250    200200   19.6400  148.3000       9.8        75       882        98
VIS    2025250    200200   19.6400  148.2900      10.0        70       867        99
VIS    2025250    200200   19.6200  148.2500      10.8        70       884        98
VIS    2025250    200200   19.6200  148.2500      11.0        70       905        97
VIS    2025250    200200   19.6200  148.2000       9.3        54       972        98
VIS    2025250    200200   19.6300  148.1800       9.3        53       901        96
VIS    2025250    200200   19.6200  148.1600       9.5        56       871        95
VIS    2025250    200200   19.6100  148.1400       9.5        57       866        97
VIS    2025250    200200   19.6200  148.1200       9.7        53       866        96
VIS    2025250    200200   19.6100  148.0800      10.2        47       881        95
VIS    2025250    200200   19.6200  148.0700      10.4        48       883        95
VIS    2025250    200200   19.6100  148.0300      10.7        50       878        96
VIS    2025250    200200   19.6300  148.0200      10.3        51       837        94
VIS    2025250    200200   19.6200  148.0000      10.8        53       854        95
VIS    2025250    200200   19.6100  147.9600      11.5        52       885        97
VIS    2025250    200200   19.6100  147.9300      10.1        52       818        93
VIS    2025250    200200   19.6100  147.9200       9.5        58       817        90
VIS    2025250    200200   19.6200  147.8900       9.7        73       816        95
VIS    2025250    200200   19.6100  147.8700       9.9        76       801        99
VIS    2025250    200200   19.6300  147.8300       9.9        62       844        98
VIS    2025250    200200   19.6100  147.8000      12.2        52       881        97
VIS    2025250    200200   19.6200  147.7900      12.1        51       881        96
VIS    2025250    200200   19.6200  147.7700      12.0        52       886        96
VIS    2025250    200200   19.6100  147.6400      12.1        47       897        95
VIS    2025250    200200   19.6100  147.6200      12.2        50       898        96
VIS    2025250    200200   19.6100  147.5800      12.9        54       898        98
VIS    2025250    200200   19.6200  147.5500      13.2        50       930        98
VIS    2025250    200200   19.6100  147.5500      13.1        51       941        99
VIS    2025250    200200   19.6300  147.4800      12.6        55       876        98
VIS    2025250    200200   19.6100  147.4300      12.9        54       926        98
VIS    2025250    200200   19.6200  147.4300      12.9        54       926        99
VIS    2025250    200200   19.6200  147.4000      13.4        56       925        98
VIS    2025250    200200   19.6100  147.3600      13.5        57       914        99
VIS    2025250    200200   19.6200  147.3200      13.3        54       941        99
VIS    2025250    200200   19.6200  147.2900      14.0        54       946       100
VIS    2025250    200200   19.6100  147.2600      14.6        54       952        99
VIS    2025250    200200   19.6200  147.2400      14.5        54       959        98
VIS    2025250    200200   19.6200  147.2200      15.0        56       959        97
VIS    2025250    200200   19.6200  147.2000      16.0        56       939        95
VIS    2025250    200200   19.6000  147.1600      15.0        51       959        98
VIS    2025250    200200   19.6000  147.1500      14.9        51       977        99
VIS    2025250    200200   19.6100  147.1100      14.9        54       984       100
VIS    2025250    200200   19.6200  147.0800      15.8        57       945       100
VIS    2025250    200200   19.6100  147.0600      16.1        56       930        98
VIS    2025250    200200   19.6000  147.0300      15.5        63       916        99
VIS    2025250    200200   19.6100  149.1100       8.9        59       950        95
VIS    2025250    200200   19.6000  149.1000       8.7        57       950        96
VIS    2025250    200200   19.6000  148.6900      10.7        53       982        98
VIS    2025250    200200   19.6100  148.6600      10.4        54       966        98
VIS    2025250    200200   19.6100  148.6500       9.8        57       963        97
VIS    2025250    200200   19.6100  148.6000       8.4        67       933        95
VIS    2025250    200200   19.6100  148.6000       8.4        68       933        95
VIS    2025250    200200   19.6000  148.5600       7.8        81       938        90
VIS    2025250    200200   19.6000  148.5400       7.3        76       890        93
VIS    2025250    200200   19.6000  148.5100       7.3        71       897        95
VIS    2025250    200200   19.6100  148.4800       6.8        75       880        94
VIS    2025250    200200   19.6100  148.4600       7.5        75       851        96
VIS    2025250    200200   19.6100  148.4300       8.2        74       851        97
VIS    2025250    200200   19.6000  148.4000       8.9        67       858        98
VIS    2025250    200200   19.6000  148.3800       9.6        66       874        98
VIS    2025250    200200   19.6000  148.3700       9.6        66       877        99
VIS    2025250    200200   19.6100  148.3400       9.6        72       876        99
VIS    2025250    200200   19.6000  148.3100      10.0        63       879        99
VIS    2025250    200200   19.5900  148.2800       9.8        67       882       100
VIS    2025250    200200   19.6000  148.2700       9.9        72       882        99
VIS    2025250    200200   19.6000  148.2500      10.4        76       882        97
VIS    2025250    200200   19.6000  148.2200      10.4        64       944        97
VIS    2025250    200200   19.5900  148.1800       9.6        51       905        96
VIS    2025250    200200   19.6100  148.1600       9.6        56       881        96
VIS    2025250    200200   19.5900  148.1400      10.3        53       874        97
VIS    2025250    200200   19.6000  148.1000      10.1        49       875        94
VIS    2025250    200200   19.5900  148.0800      10.2        49       888        96
VIS    2025250    200200   19.5900  148.0600      10.7        49       901        96
VIS    2025250    200200   19.5900  148.0400      11.8        47       898        95
VIS    2025250    200200   19.5900  148.0200      12.5        47       898        96
VIS    2025250    200200   19.5900  148.0000      12.1        48       885        95
VIS    2025250    200200   19.6000  147.9600      11.2        51       885        97
VIS    2025250    200200   19.6000  147.9500      11.0        51       881        97
VIS    2025250    200200   19.5900  147.9000      10.5        57       816        90
VIS    2025250    200200   19.6000  147.8800      10.2        71       816        97
VIS    2025250    200200   19.5900  147.8300      11.2        54       854        96
VIS    2025250    200200   19.5900  147.8300      11.6        53       854        95
VIS    2025250    200200   19.5900  147.7800      12.5        49       886        95
VIS    2025250    200200   19.5900  147.7800      12.6        48       886        95
VIS    2025250    200200   19.5900  147.6400      12.0        47       915        95
VIS    2025250    200200   19.5800  147.6300      12.0        48       898        95
VIS    2025250    200200   19.5900  147.5900      12.2        54       898        98
VIS    2025250    200200   19.5900  147.5600      12.7        54       900        98
VIS    2025250    200200   19.6000  147.5500      12.7        53       915        98
VIS    2025250    200200   19.6000  147.4400      12.5        54       923        98
VIS    2025250    200200   19.5800  147.4100      13.4        54       928        98
VIS    2025250    200200   19.6000  147.4000      13.4        54       926        97
VIS    2025250    200200   19.5900  147.3700      13.8        55       914        98
VIS    2025250    200200   19.5800  147.3400      13.8        55       907        99
VIS    2025250    200200   19.5800  147.3100      13.7        56       937        99
VIS    2025250    200200   19.6000  147.3000      13.6        56       945       100
VIS    2025250    200200   19.6000  147.2700      14.5        55       952        99
VIS    2025250    200200   19.5800  147.2300      15.2        55       965        98
VIS    2025250    200200   19.5800  147.2300      15.2        55       966        98
VIS    2025250    200200   19.5900  147.1900      14.7        49       956        98
VIS    2025250    200200   19.5900  147.1600      14.9        50       955        98
VIS    2025250    200200   19.5900  147.1600      14.9        50       955        98
VIS    2025250    200200   19.5800  147.1300      14.7        51       955        99
VIS    2025250    200200   19.6000  147.0900      15.2        55       970       100
VIS    2025250    200200   19.6000  147.0600      16.0        55       933        98
VIS    2025250    200200   19.6000  147.0600      16.1        55       933        98
VIS    2025250    200200   19.5800  149.1300       9.3        61       991        93
VIS    2025250    200200   19.5900  148.6900      10.8        54       980        97
VIS    2025250    200200   19.5800  148.6600      10.4        55       971        97
VIS    2025250    200200   19.5700  148.6600      10.4        54       971        97
VIS    2025250    200200   19.5800  148.6100       8.6        60       933        96
VIS    2025250    200200   19.5700  148.6100       8.5        66       944        94
VIS    2025250    200200   19.5700  148.5600       8.4        82       892        93
VIS    2025250    200200   19.5700  148.5400       8.0        68       875        97
VIS    2025250    200200   19.5700  148.5100       7.9        65       890        97
VIS    2025250    200200   19.5700  148.4900       7.1        66       899        95
VIS    2025250    200200   19.5800  148.4800       7.0        67       897        94
VIS    2025250    200200   19.5900  148.4500       7.2        66       825        94
VIS    2025250    200200   19.5700  148.4100       8.2        67       867        95
VIS    2025250    200200   19.5700  148.4100       8.3        68       891        95
VIS    2025250    200200   19.5700  148.3700       9.0        73       891        98
VIS    2025250    200200   19.5700  148.3400       9.0        69       880        99
VIS    2025250    200200   19.5700  148.3300       9.2        69       880        99
VIS    2025250    200200   19.5800  148.3100       9.9        61       879        99
VIS    2025250    200200   19.5800  148.2800       9.7        68       873       100
VIS    2025250    200200   19.5800  148.2500      10.2        81       882        95
VIS    2025250    200200   19.5900  148.2200      10.6        68       929        97
VIS    2025250    200200   19.5900  148.1900      10.0        49       985        99
VIS    2025250    200200   19.5900  148.1800       9.6        51       905        96
VIS    2025250    200200   19.5700  148.1400      10.6        55       876        98
VIS    2025250    200200   19.5600  148.1300      10.7        57       875        98
VIS    2025250    200200   19.5800  148.0900      10.2        49       888        96
VIS    2025250    200200   19.5800  148.0600      10.7        48       912        97
VIS    2025250    200200   19.5800  148.0500      11.1        48       912        97
VIS    2025250    200200   19.5800  148.0300      12.4        46       899        95
VIS    2025250    200200   19.5800  148.0100      12.7        47       892        95
VIS    2025250    200200   19.5600  147.9800      11.9        47       896        96
VIS    2025250    200200   19.5700  147.9500      10.8        52       881        96
VIS    2025250    200200   19.5800  147.9300      10.2        49       837        93
VIS    2025250    200200   19.5700  147.8900      10.6        50       803        91
VIS    2025250    200200   19.5600  147.8800      10.5        57       816        95
VIS    2025250    200200   19.5700  147.8400      11.0        56       854        97
VIS    2025250    200200   19.5800  147.8200      11.9        52       854        94
VIS    2025250    200200   19.5800  147.8100      12.4        52       886        97
VIS    2025250    200200   19.5600  147.7800      12.0        49       921        97
VIS    2025250    200200   19.5700  147.6500      11.8        48       933        96
VIS    2025250    200200   19.5700  147.6300      12.2        49       898        96
VIS    2025250    200200   19.5700  147.6100      12.3        51       897        96
VIS    2025250    200200   19.5600  147.5800      12.6        52       896        97
VIS    2025250    200200   19.5700  147.5600      12.7        52       903        97
VIS    2025250    200200   19.5600  147.4400      12.6        57       912        99
VIS    2025250    200200   19.5800  147.4100      13.4        55       928        98
VIS    2025250    200200   19.5600  147.3700      13.7        55       914        98
VIS    2025250    200200   19.5800  147.3400      13.8        55       907        99
VIS    2025250    200200   19.5600  147.3300      13.6        54       915        98
VIS    2025250    200200   19.5600  147.3100      13.6        56       937        99
VIS    2025250    200200   19.5600  147.2200      14.3        52       971        99
VIS    2025250    200200   19.5700  147.1900      14.0        49       956        98
VIS    2025250    200200   19.5700  147.1700      14.5        49       934        96
VIS    2025250    200200   19.5500  147.1600      15.3        54       919        96
VIS    2025250    200200   19.5500  147.1200      15.0        53       943        97
VIS    2025250    200200   19.5600  147.0900      14.5        50       955        96
VIS    2025250    200200   19.5600  147.0400      15.3        55       921        97
VIS    2025250    200200   19.5500  147.0200      13.9        55       873        95
VIS    2025250    200200   19.5600  147.0100      13.1        57       779        91
VIS    2025250    200200   19.5500  149.3600       9.2        59       976        91
VIS    2025250    200200   19.5500  149.2600       9.1        59       994        90
VIS    2025250    200200   19.5600  149.1800       9.5        61       991        93
VIS    2025250    200200   19.5500  149.1600       9.6        63       967        93
VIS    2025250    200200   19.5500  149.1500       9.1        60       967        95
VIS    2025250    200200   19.5600  149.1100       8.9        62       956        94
VIS    2025250    200200   19.5700  148.6500      10.2        54       963        98
VIS    2025250    200200   19.5600  148.6200       9.1        58       944        96
VIS    2025250    200200   19.5700  148.6200       9.0        59       944        96
VIS    2025250    200200   19.5600  148.5900       8.4        75       944        92
VIS    2025250    200200   19.5500  148.5500       8.1        75       872        97
VIS    2025250    200200   19.5600  148.5400       8.0        67       872        97
VIS    2025250    200200   19.5400  148.5100       7.4        69       880        96
VIS    2025250    200200   19.5600  148.4800       6.7        71       880        93
VIS    2025250    200200   19.5500  148.4500       7.0        69       825        94
VIS    2025250    200200   19.5600  148.4200       7.6        68       825        94
VIS    2025250    200200   19.5400  148.4100       8.1        73       867        95
VIS    2025250    200200   19.5500  148.3800       8.6        76       904        95
VIS    2025250    200200   19.5500  148.3700       8.8        75       898        97
VIS    2025250    200200   19.5400  148.3300       9.1        69       880        99
VIS    2025250    200200   19.5600  148.3100       9.4        67       873       100
VIS    2025250    200200   19.5600  148.2900       9.8        68       871       100
VIS    2025250    200200   19.5600  148.2600      10.1        76       873        98
VIS    2025250    200200   19.5600  148.2400      10.5        69       910        97
VIS    2025250    200200   19.5500  148.2200      10.2        54       980        99
VIS    2025250    200200   19.5500  148.1800       9.5        53       964        98
VIS    2025250    200200   19.5500  148.1700       9.7        55       912        97
VIS    2025250    200200   19.5400  148.1400      10.4        60       876        98
VIS    2025250    200200   19.5600  148.1000      10.8        51       881        96
VIS    2025250    200200   19.5600  148.0800      11.2        48       912        97
VIS    2025250    200200   19.5500  148.0700      11.5        48       926        98
VIS    2025250    200200   19.5500  148.0300      12.2        54       922        98
VIS    2025250    200200   19.5500  148.0200      12.5        54       912        98
VIS    2025250    200200   19.5600  147.9800      11.8        47       905        97
VIS    2025250    200200   19.5500  147.9700      11.8        48       907        97
VIS    2025250    200200   19.5400  147.9500      11.3        52       892        98
VIS    2025250    200200   19.5400  147.9200      10.5        51       826        93
VIS    2025250    200200   19.5600  147.8800      10.6        55       816        94
VIS    2025250    200200   19.5600  147.8700      10.6        55       827        95
VIS    2025250    200200   19.5600  147.8400      11.2        54       888        98
VIS    2025250    200200   19.5600  147.8100      12.1        53       909        97
VIS    2025250    200200   19.5500  147.7800      12.0        51       926        99
VIS    2025250    200200   19.5400  147.6500      11.6        49       937        96
VIS    2025250    200200   19.5500  147.6300      12.2        51       915        97
VIS    2025250    200200   19.5500  147.6200      12.4        52       898        97
VIS    2025250    200200   19.5300  147.5900      12.5        54       896        98
VIS    2025250    200200   19.5400  147.5500      13.0        50       914        97
VIS    2025250    200200   19.5300  147.5500      12.8        51       914        96
VIS    2025250    200200   19.5500  147.4400      12.6        56       912        99
VIS    2025250    200200   19.5400  147.4000      12.9        56       912        97
VIS    2025250    200200   19.5400  147.4000      13.1        55       912        98
VIS    2025250    200200   19.5400  147.3700      13.6        54       910        98
VIS    2025250    200200   19.5500  147.3300      13.5        54       912        98
VIS    2025250    200200   19.5300  147.3100      13.4        55       937        99
VIS    2025250    200200   19.5500  147.2300      14.2        53       967        98
VIS    2025250    200200   19.5400  147.2200      13.6        49       977        99
VIS    2025250    200200   19.5300  147.1900      14.4        54       964       100
VIS    2025250    200200   19.5500  147.1600      15.4        54       919        95
VIS    2025250    200200   19.5400  147.1000      14.8        53       945        92
VIS    2025250    200200   19.5300  147.0700      15.7        61       985        97
VIS    2025250    200200   19.5400  147.0300      14.9        60       921        98
VIS    2025250    200200   19.5500  147.0200      14.0        56       873        95
VIS    2025250    200200   19.5400  149.4100       8.8        62       985        90
VIS    2025250    200200   19.5500  149.3600       9.2        59       976        91
VIS    2025250    200200   19.5400  149.3500       9.2        60       943        91
VIS    2025250    200200   19.5300  149.2400       8.7        58       999        95
VIS    2025250    200200   19.5300  149.2300       8.5        56       999        96
VIS    2025250    200200   19.5500  149.1900       9.3        59       970        95
VIS    2025250    200200   19.5500  149.1800       9.6        61       970        93
VIS    2025250    200200   19.5400  149.1400       8.6        59       967        95
VIS    2025250    200200   19.5400  149.1300       8.6        61       964        95
VIS    2025250    200200   19.5400  148.6700       9.3        52       986        99
VIS    2025250    200200   19.5400  148.6500       9.4        55       971        94
VIS    2025250    200200   19.5400  148.6400       9.1        58       953        91
VIS    2025250    200200   19.5400  148.6000       8.5        73       924        93
VIS    2025250    200200   19.5400  148.5700       8.2        71       885        97
VIS    2025250    200200   19.5300  148.5500       7.9        66       861        96
VIS    2025250    200200   19.5200  148.5200       7.5        74       861        96
VIS    2025250    200200   19.5400  148.5000       7.2        73       880        95
VIS    2025250    200200   19.5200  148.4700       7.3        83       849        92
VIS    2025250    200200   19.5200  148.4600       7.3        82       833        94
VIS    2025250    200200   19.5400  148.4200       8.1        72       860        94
VIS    2025250    200200   19.5400  148.4100       8.3        76       904        94
VIS    2025250    200200   19.5200  148.3700       8.6        71       901        97
VIS    2025250    200200   19.5200  148.3500       9.1        66       883        99
VIS    2025250    200200   19.5400  148.3300       9.1        68       878        99
VIS    2025250    200200   19.5200  148.3100       9.3        70       876        99
VIS    2025250    200200   19.5200  148.2700       9.8        78       887        96
VIS    2025250    200200   19.5300  148.2600      10.0        73       887        98
VIS    2025250    200200   19.5400  148.1900       9.9        51       984        99
VIS    2025250    200200   19.5200  148.1700      10.0        59       964        98
VIS    2025250    200200   19.5200  148.1600      10.1        59       879        99
VIS    2025250    200200   19.5300  148.1400      10.5        61       876        94
VIS    2025250    200200   19.5100  148.1100      11.4        55       869        97
VIS    2025250    200200   19.5200  148.0700      11.5        48       891        96
VIS    2025250    200200   19.5200  148.0600      11.3        49       901        97
VIS    2025250    200200   19.5300  148.0200      11.4        58       912        99
VIS    2025250    200200   19.5200  148.0100      11.5        56       905        99
VIS    2025250    200200   19.5200  147.9700      12.7        50       910        97
VIS    2025250    200200   19.5200  147.9600      12.6        50       910        97
VIS    2025250    200200   19.5200  147.9200      11.2        50       826        92
VIS    2025250    200200   19.5200  147.8400      11.2        49       881        96
VIS    2025250    200200   19.5100  147.8400      11.5        48       888        96
VIS    2025250    200200   19.5100  147.7900      12.2        50       917        98
VIS    2025250    200200   19.5100  147.6700      11.7        49       937        97
VIS    2025250    200200   19.5100  147.6500      11.9        49       933        97
VIS    2025250    200200   19.5100  147.6200      12.3        53       903        97
VIS    2025250    200200   19.5200  147.6100      12.4        55       897        98
VIS    2025250    200200   19.5300  147.5700      12.5        54       897        98
VIS    2025250    200200   19.5300  147.5500      12.7        52       914        96
VIS    2025250    200200   19.5100  147.4800      12.1        51       869        95
VIS    2025250    200200   19.5300  147.4500      12.3        53       869        97
VIS    2025250    200200   19.5300  147.4400      12.3        55       875        97
VIS    2025250    200200   19.5300  147.4000      13.0        55       888        98
VIS    2025250    200200   19.5100  147.3900      13.1        54       888        98
VIS    2025250    200200   19.5100  147.3600      13.3        53       910        98
VIS    2025250    200200   19.5200  147.3200      13.4        53       925        98
VIS    2025250    200200   19.5200  147.3200      13.3        53       931        99
VIS    2025250    200200   19.5200  147.2900      13.7        53       946        96
VIS    2025250    200200   19.5300  147.2700      13.9        54       959        95
VIS    2025250    200200   19.5000  147.2300      13.5        51       966        99
VIS    2025250    200200   19.5000  147.2100      13.8        53       966        99
VIS    2025250    200200   19.5000  147.1700      14.5        53       943        98
VIS    2025250    200200   19.5100  147.1600      14.7        53       933        97
VIS    2025250    200200   19.5000  147.0800      15.8        57       976        98
VIS    2025250    200200   19.5000  147.0700      16.2        58       976        97
VIS    2025250    200200   19.5200  147.0300      15.5        59       875        96
VIS    2025250    200200   19.4900  145.5800      10.7       120       199        97
VIS    2025250    200200   19.4900  145.5700      10.8       117       199        97
VIS    2025250    200200   19.5100  149.4300       8.4        52       986        93
VIS    2025250    200200   19.5100  149.4200       8.3        51       985        93
VIS    2025250    200200   19.5100  149.3800       8.6        56       982        90
VIS    2025250    200200   19.5000  149.3500       9.0        62       959        91
VIS    2025250    200200   19.5100  149.3500       9.2        65       943        90
VIS    2025250    200200   19.5100  149.2200       8.6        57       992        95
VIS    2025250    200200   19.5100  149.2100       8.7        57       992        94
VIS    2025250    200200   19.5200  149.1800       9.2        63       965        93
VIS    2025250    200200   19.5000  149.1700       9.1        63       945        94
VIS    2025250    200200   19.5100  149.1300       9.2        66       942        93
VIS    2025250    200200   19.5000  149.1000       9.0        65       942        95
VIS    2025250    200200   19.5000  149.0700       8.9        57       942        97
VIS    2025250    200200   19.5000  148.7700       9.4        60       985        92
VIS    2025250    200200   19.5000  148.7500       9.4        60       985        90
VIS    2025250    200200   19.5000  148.7100       9.1        56       999        97
VIS    2025250    200200   19.5000  148.6900       9.1        56       984        98
VIS    2025250    200200   19.5000  148.6700       9.2        54       973        98
VIS    2025250    200200   19.5000  148.6500       9.8        52       964        91
VIS    2025250    200200   19.5000  148.6200       8.6        67       923        91
VIS    2025250    200200   19.5000  148.5800       8.1        69       885        97
VIS    2025250    200200   19.5100  148.5700       8.3        61       880        95
VIS    2025250    200200   19.5000  148.5500       8.0        60       861        95
VIS    2025250    200200   19.4900  148.5100       7.9        75       868        97
VIS    2025250    200200   19.4900  148.5000       7.8        75       868        97
VIS    2025250    200200   19.5100  148.4700       7.4        83       855        92
VIS    2025250    200200   19.5100  148.4600       7.4        82       849        94
VIS    2025250    200200   19.5000  148.4100       8.0        74       866        97
VIS    2025250    200200   19.4900  148.4000       8.0        72       867        97
VIS    2025250    200200   19.4900  148.3600       9.0        68       871        99
VIS    2025250    200200   19.5000  148.3400       9.4        69       876        99
VIS    2025250    200200   19.4900  148.3100       9.9        67       870       100
VIS    2025250    200200   19.5100  148.2900       9.9        76       876        98
VIS    2025250    200200   19.5100  148.2700       9.8        81       887        95
VIS    2025250    200200   19.5000  148.2200       9.7        60       972        96
VIS    2025250    200200   19.4900  148.2100      10.2        54       977        98
VIS    2025250    200200   19.5100  148.1600      10.1        63       963        97
VIS    2025250    200200   19.5000  148.1600      10.3        65       879        99
VIS    2025250    200200   19.4900  148.1300      11.0        70       871        91
VIS    2025250    200200   19.4900  148.0900      11.8        50       876        96
VIS    2025250    200200   19.5100  148.0700      11.7        48       888        95
VIS    2025250    200200   19.5000  148.0600      11.5        52       892        97
VIS    2025250    200200   19.5000  148.0300      11.4        57       896        99
VIS    2025250    200200   19.5100  148.0000      11.6        53       905        99
VIS    2025250    200200   19.4900  147.9700      12.3        50       905        97
VIS    2025250    200200   19.5100  147.9500      12.2        50       905        97
VIS    2025250    200200   19.5000  147.9300      12.0        49       830        91
VIS    2025250    200200   19.5100  147.8400      11.6        47       867        94
VIS    2025250    200200   19.4900  147.8100      12.2        48       902        97
VIS    2025250    200200   19.4900  147.8000      12.3        48       912        96
VIS    2025250    200200   19.5000  147.7800      12.2        50       928        97
VIS    2025250    200200   19.4900  147.6900      11.9        51       977        99
VIS    2025250    200200   19.5000  147.6700      11.7        50       950        98
VIS    2025250    200200   19.4800  147.6400      12.3        50       922        96
VIS    2025250    200200   19.4900  147.6100      12.3        53       896        97
VIS    2025250    200200   19.5000  147.5900      12.7        54       896        98
VIS    2025250    200200   19.4800  147.5800      13.1        50       877        96
VIS    2025250    200200   19.5000  147.5500      12.9        49       914        94
VIS    2025250    200200   19.4900  147.4700      12.4        50       878        96
VIS    2025250    200200   19.5000  147.4600      12.4        51       876        97
VIS    2025250    200200   19.4900  147.4400      12.5        55       878        97
VIS    2025250    200200   19.4900  147.4100      12.7        54       875        98
VIS    2025250    200200   19.5000  147.3800      13.2        52       901        97
VIS    2025250    200200   19.4900  147.3600      13.2        53       912        98
VIS    2025250    200200   19.5000  147.2800      13.4        53       959        95
VIS    2025250    200200   19.4900  147.2400      13.8        50       976       100
VIS    2025250    200200   19.4900  147.2300      13.8        50       951        97
VIS    2025250    200200   19.4800  147.2100      13.7        53       935        97
VIS    2025250    200200   19.5000  147.1700      14.4        52       933        97
VIS    2025250    200200   19.4800  147.1300      15.1        50       879        91
VIS    2025250    200200   19.4900  147.0800      16.0        56       974        97
VIS    2025250    200200   19.4800  147.0600      16.2        55       967        97
VIS    2025250    200200   19.4900  147.0300      16.4        59       820        91
VIS    2025250    200200   19.4800  145.5800      10.5       118       199        96
VIS    2025250    200200   19.4900  149.4300       8.7        55       986        93
VIS    2025250    200200   19.5000  149.4000       8.2        48       984        97
VIS    2025250    200200   19.5000  149.3700       8.4        54       982        92
VIS    2025250    200200   19.4800  149.3400       8.8        61       936        94
VIS    2025250    200200   19.4900  149.3300       9.4        66       936        92
VIS    2025250    200200   19.4900  149.2500       9.0        56       986        92
VIS    2025250    200200   19.5000  149.2100       8.9        58       978        95
VIS    2025250    200200   19.4900  149.1900       9.0        62       962        91
VIS    2025250    200200   19.5000  149.1600       9.2        65       940        93
VIS    2025250    200200   19.5000  149.1400       9.7        69       940        92
VIS    2025250    200200   19.4800  149.1200       9.8        70       951        90
VIS    2025250    200200   19.5000  149.1000       9.0        63       942        95
VIS    2025250    200200   19.4800  149.0400       9.5        62       998        92
VIS    2025250    200200   19.4700  148.7800       9.0        63       985        93
VIS    2025250    200200   19.4800  148.7700       9.1        62       985        92
VIS    2025250    200200   19.4800  148.7100       9.6        56       984        98
VIS    2025250    200200   19.4900  148.6900       9.4        56       984        98
VIS    2025250    200200   19.4800  148.6600       9.7        54       968        92
VIS    2025250    200200   19.4900  148.6500       9.8        54       964        91
VIS    2025250    200200   19.4800  148.6200       8.8        66       938        93
VIS    2025250    200200   19.4800  148.5800       7.7        67       883        97
VIS    2025250    200200   19.4900  148.5600       7.8        61       878        96
VIS    2025250    200200   19.4900  148.5500       7.9        59       874        96
VIS    2025250    200200   19.4900  148.5100       7.9        73       868        97
VIS    2025250    200200   19.4800  148.4900       7.8        73       868        97
VIS    2025250    200200   19.4700  148.4600       7.4        75       859        95
VIS    2025250    200200   19.4700  148.4300       8.0        78       856        96
VIS    2025250    200200   19.4700  148.4200       8.0        77       858        97
VIS    2025250    200200   19.4900  148.4000       8.0        72       866        97
VIS    2025250    200200   19.4900  148.3700       8.7        69       871        99
VIS    2025250    200200   19.4700  148.3500       9.2        73       867        99
VIS    2025250    200200   19.4900  148.3100      10.0        67       870       100
VIS    2025250    200200   19.4800  148.2900      10.0        75       878        99
VIS    2025250    200200   19.4900  148.2800      10.1        81       878        96
VIS    2025250    200200   19.4700  148.2500       9.7        81       934        91
VIS    2025250    200200   19.4700  148.2100      10.4        53       977        99
VIS    2025250    200200   19.4700  148.2000      10.5        52       977        99
VIS    2025250    200200   19.4900  148.1600      10.6        68       943        96
VIS    2025250    200200   19.4700  148.1400      10.7        74       882        97
VIS    2025250    200200   19.4700  148.1200      10.3        69       876        94
VIS    2025250    200200   19.4600  148.1000      10.2        54       879        97
VIS    2025250    200200   19.4800  148.0700      11.8        47       879        95
VIS    2025250    200200   19.4800  148.0400      12.0        54       892        98
VIS    2025250    200200   19.4600  148.0100      11.9        51       907        98
VIS    2025250    200200   19.4600  148.0000      11.9        50       907        98
VIS    2025250    200200   19.4600  147.9700      12.0        49       916        98
VIS    2025250    200200   19.4700  147.9500      12.2        49       895        95
VIS    2025250    200200   19.4700  147.9300      12.2        49       863        92
VIS    2025250    200200   19.4600  147.8600      12.6        44       871        92
VIS    2025250    200200   19.4600  147.8300      12.2        46       902        96
VIS    2025250    200200   19.4600  147.8200      12.2        47       917        97
VIS    2025250    200200   19.4800  147.8000      12.3        48       917        96
VIS    2025250    200200   19.4600  147.7700      12.2        52       928        96
VIS    2025250    200200   19.4800  147.7400      11.9        69       917        90
VIS    2025250    200200   19.4600  147.6900      12.1        52       977        99
VIS    2025250    200200   19.4600  147.6600      12.5        49       970       100
VIS    2025250    200200   19.4600  147.6500      12.4        49       933        97
VIS    2025250    200200   19.4600  147.6300      12.0        51       896        96
VIS    2025250    200200   19.4700  147.5900      12.9        51       828        93
VIS    2025250    200200   19.4800  147.5800      13.3        50       877        96
VIS    2025250    200200   19.4700  147.4700      12.5        50       906        96
VIS    2025250    200200   19.4800  147.4400      12.7        53       888        96
VIS    2025250    200200   19.4700  147.4300      12.9        52       888        96
VIS    2025250    200200   19.4600  147.3900      13.0        52       869        96
VIS    2025250    200200   19.4600  147.3700      13.1        53       893        98
VIS    2025250    200200   19.4700  147.3500      13.1        53       912        98
VIS    2025250    200200   19.4600  147.3200      13.3        54       931        97
VIS    2025250    200200   19.4600  147.3100      13.4        53       931        97
VIS    2025250    200200   19.4800  147.2800      13.4        51       963        96
VIS    2025250    200200   19.4600  147.2500      13.7        49       951        99
VIS    2025250    200200   19.4600  147.2200      13.8        50       929        95
VIS    2025250    200200   19.4700  147.2100      13.5        53       929        96
VIS    2025250    200200   19.4500  147.1900      13.3        57       929        97
VIS    2025250    200200   19.4700  147.1400      15.1        50       879        93
VIS    2025250    200200   19.4600  147.1400      15.2        50       879        93
VIS    2025250    200200   19.4500  147.1100      15.4        52       881        90
VIS    2025250    200200   19.4600  147.0700      16.3        54       961        99
VIS    2025250    200200   19.4700  147.0400      16.2        57       929        98
VIS    2025250    200200   19.4400  145.1300      12.9       135       198        92
VIS    2025250    200200   19.4300  144.8400      13.3       135       196        90
VIS    2025250    200200   19.4600  149.4100       8.4        55       980        94
VIS    2025250    200200   19.4800  149.3700       8.0        47       966        96
VIS    2025250    200200   19.4700  149.3600       8.1        49       966        97
VIS    2025250    200200   19.4600  149.3400       8.6        50       946        93
VIS    2025250    200200   19.4700  149.3100       9.2        62       933        92
VIS    2025250    200200   19.4600  149.2500       9.4        50       996        90
VIS    2025250    200200   19.4500  149.2100       9.2        58       996        94
VIS    2025250    200200   19.4600  149.2000       9.1        60       978        94
VIS    2025250    200200   19.4600  149.1900       9.1        63       957        91
VIS    2025250    200200   19.4700  149.1500       9.6        68       939        91
VIS    2025250    200200   19.4700  148.7800       9.0        62       985        93
VIS    2025250    200200   19.4700  148.7700       9.0        61       985        93
VIS    2025250    200200   19.4500  148.7300       9.2        56       988        98
VIS    2025250    200200   19.4500  148.6900      10.1        54       976        98
VIS    2025250    200200   19.4700  148.6600       9.9        53       968        92
VIS    2025250    200200   19.4600  148.6500      10.0        54       968        95
VIS    2025250    200200   19.4500  148.6100       8.7        54       956        93
VIS    2025250    200200   19.4600  148.5800       7.5        66       887        94
VIS    2025250    200200   19.4600  148.5800       7.4        67       887        94
VIS    2025250    200200   19.4400  148.5300       7.8        63       893        97
VIS    2025250    200200   19.4400  148.5200       8.0        63       893        97
VIS    2025250    200200   19.4400  148.4900       8.1        68       889        97
VIS    2025250    200200   19.4500  148.4600       7.6        69       862        96
VIS    2025250    200200   19.4500  148.4500       7.7        69       856        97
VIS    2025250    200200   19.4600  148.4100       8.0        68       852        97
VIS    2025250    200200   19.4500  148.3900       8.4        67       848        97
VIS    2025250    200200   19.4500  148.3700       8.6        69       854        98
VIS    2025250    200200   19.4600  148.3500       9.0        72       867        99
VIS    2025250    200200   19.4600  148.3100       9.6        64       870       100
VIS    2025250    200200   19.4500  148.2900       9.8        63       870        99
VIS    2025250    200200   19.4400  148.2700      10.0        66       885       100
VIS    2025250    200200   19.4500  148.2400      10.2        62       920        98
VIS    2025250    200200   19.4400  148.2200      10.4        58       934        98
VIS    2025250    200200   19.4600  148.2000      10.6        51       977       100
VIS    2025250    200200   19.4600  148.1600      10.4        65       933        98
VIS    2025250    200200   19.4400  148.1500      10.5        70       898        97
VIS    2025250    200200   19.4600  148.1300      10.3        72       876        94
VIS    2025250    200200   19.4500  148.0900      10.5        45       885        94
VIS    2025250    200200   19.4400  148.0600      11.3        47       888        95
VIS    2025250    200200   19.4400  148.0500      11.3        48       888        96
VIS    2025250    200200   19.4400  148.0200      11.6        51       909        98
VIS    2025250    200200   19.4600  147.9800      12.0        48       919        98
VIS    2025250    200200   19.4600  147.9700      12.1        48       919        97
VIS    2025250    200200   19.4500  147.9400      12.2        47       870        92
VIS    2025250    200200   19.4400  147.9200      12.2        47       837        90
VIS    2025250    200200   19.4600  147.8600      12.6        44       879        92
VIS    2025250    200200   19.4600  147.8300      12.2        46       904        96
VIS    2025250    200200   19.4400  147.8000      12.3        46       928        97
VIS    2025250    200200   19.4400  147.7700      12.5        47       958        96
VIS    2025250    200200   19.4400  147.7300      12.4        64       941        95
VIS    2025250    200200   19.4400  147.6900      12.1        53       977        99
VIS    2025250    200200   19.4500  147.6600      12.4        49       970       100
VIS    2025250    200200   19.4400  147.6500      12.3        51       970       100
VIS    2025250    200200   19.4400  147.6300      11.5        53       881        96
VIS    2025250    200200   19.4400  147.6000      11.1        54       819        94
VIS    2025250    200200   19.4500  147.4900      12.5        49       915        96
VIS    2025250    200200   19.4500  147.4600      12.5        49       915        96
VIS    2025250    200200   19.4400  147.4500      12.4        50       912        97
VIS    2025250    200200   19.4500  147.4100      13.0        48       875        95
VIS    2025250    200200   19.4500  147.3900      12.9        52       869        96
VIS    2025250    200200   19.4400  147.3600      13.0        54       879        98
VIS    2025250    200200   19.4500  147.3400      13.1        54       912        97
VIS    2025250    200200   19.4500  147.3200      13.3        53       929        97
VIS    2025250    200200   19.4400  147.3100      13.2        52       931        97
VIS    2025250    200200   19.4400  147.2800      12.6        50       931        95
VIS    2025250    200200   19.4500  147.2500      13.2        49       945        99
VIS    2025250    200200   19.4500  147.2100      13.9        51       935        96
VIS    2025250    200200   19.4300  147.2000      13.8        55       935        97
VIS    2025250    200200   19.4500  147.1800      13.4        58       929        97
VIS    2025250    200200   19.4500  147.1400      15.1        52       875        94
VIS    2025250    200200   19.4500  147.1200      15.3        52       881        91
VIS    2025250    200200   19.4400  147.1100      15.3        54       881        93
VIS    2025250    200200   19.4300  147.0600      15.7        54       951        98
VIS    2025250    200200   19.4400  147.0600      15.9        55       951        99
VIS    2025250    200200   19.4300  144.9300      13.3       129       195        93
VIS    2025250    200200   19.4100  144.8100      14.1       134       191        91
VIS    2025250    200200   19.4400  149.4600       8.6        60       981        90
VIS    2025250    200200   19.4400  149.4000       8.5        54       980        94
VIS    2025250    200200   19.4500  149.3700       8.1        40       980        96
VIS    2025250    200200   19.4500  149.3600       8.0        38       980        97
VIS    2025250    200200   19.4500  149.3400       8.5        44       952        94
VIS    2025250    200200   19.4500  149.2500       9.4        49       996        91
VIS    2025250    200200   19.4300  149.2300       8.6        49       996        98
VIS    2025250    200200   19.4400  149.2100       9.1        58       996        95
VIS    2025250    200200   19.4400  149.1700       9.3        70       949        91
VIS    2025250    200200   19.4300  149.1600       9.5        72       944        91
VIS    2025250    200200   19.4400  149.1400      10.0        74       930        92
VIS    2025250    200200   19.4300  149.0600       8.8        57       984        93
VIS    2025250    200200   19.4200  148.8200       9.1        61       993        93
VIS    2025250    200200   19.4400  148.7900       8.6        62       985        92
VIS    2025250    200200   19.4200  148.7700       9.0        58       991        93
VIS    2025250    200200   19.4200  148.7500       9.1        58       974        95
VIS    2025250    200200   19.4300  148.6700      10.3        52       990        98
VIS    2025250    200200   19.4300  148.6500      10.4        51       990        94
VIS    2025250    200200   19.4400  148.5800       7.4        66       889        92
VIS    2025250    200200   19.4300  148.5400       7.8        69       897        96
VIS    2025250    200200   19.4300  148.5200       8.2        68       896        98
VIS    2025250    200200   19.4400  148.4900       8.2        71       889        97
VIS    2025250    200200   19.4400  148.4700       7.7        70       863        96
VIS    2025250    200200   19.4200  148.4500       7.8        66       852        96
VIS    2025250    200200   19.4200  148.4300       8.1        66       851        96
VIS    2025250    200200   19.4200  148.3900       7.9        68       845        96
VIS    2025250    200200   19.4200  148.3700       8.0        68       845        97
VIS    2025250    200200   19.4300  148.3400       8.5        72       870        98
VIS    2025250    200200   19.4200  148.3200       8.6        70       872        99
VIS    2025250    200200   19.4200  148.2900       9.6        64       879       100
VIS    2025250    200200   19.4400  148.2700       9.8        65       879       100
VIS    2025250    200200   19.4400  148.2400      10.2        61       918        98
VIS    2025250    200200   19.4400  148.2200      10.3        59       919        98
VIS    2025250    200200   19.4400  148.2100      10.4        56       953        98
VIS    2025250    200200   19.4200  148.1600       9.9        61       933        98
VIS    2025250    200200   19.4300  148.1400      10.1        64       901        95
VIS    2025250    200200   19.4200  148.1300      10.0        61       901        96
VIS    2025250    200200   19.4200  148.0900      10.7        42       894        94
VIS    2025250    200200   19.4200  148.0700      11.5        44       889        94
VIS    2025250    200200   19.4100  148.0400      11.6        45       895        95
VIS    2025250    200200   19.4100  148.0200      11.6        46       936        98
VIS    2025250    200200   19.4100  148.0000      11.8        47       939        98
VIS    2025250    200200   19.4300  147.9700      11.9        46       938        97
VIS    2025250    200200   19.4300  147.9600      12.0        46       924        96
VIS    2025250    200200   19.4200  147.9200      11.9        47       841        91
VIS    2025250    200200   19.4300  147.9100      12.3        47       837        90
VIS    2025250    200200   19.4200  147.8800      12.4        44       857        91
VIS    2025250    200200   19.4100  147.8600      12.3        44       910        95
VIS    2025250    200200   19.4300  147.8100      12.3        45       928        97
VIS    2025250    200200   19.4200  147.7800      12.5        46       958        98
VIS    2025250    200200   19.4200  147.7600      12.7        45       963        97
VIS    2025250    200200   19.4300  147.7200      12.3        60       958        98
VIS    2025250    200200   19.4300  147.6900      12.1        54       970        99
VIS    2025250    200200   19.4100  147.6700      12.0        54       956        99
VIS    2025250    200200   19.4200  147.6600      12.1        54       896        98
VIS    2025250    200200   19.4100  147.6300      12.1        52       826        93
VIS    2025250    200200   19.4100  147.5900      11.3        53       824        93
VIS    2025250    200200   19.4100  147.5900      11.2        54       819        93
VIS    2025250    200200   19.4100  147.4700      12.1        49       917        96
VIS    2025250    200200   19.4100  147.4600      12.1        49       917        96
VIS    2025250    200200   19.4100  147.4200      11.7        55       873        98
VIS    2025250    200200   19.4200  147.4000      12.1        55       848        98
VIS    2025250    200200   19.4200  147.3700      12.9        53       879        98
VIS    2025250    200200   19.4200  147.3700      13.0        54       879        98
VIS    2025250    200200   19.4100  147.3200      12.9        53       918        95
VIS    2025250    200200   19.4100  147.3200      12.8        53       915        96
VIS    2025250    200200   19.4300  147.2900      12.4        50       929        94
VIS    2025250    200200   19.4100  147.2500      12.5        50       945        95
VIS    2025250    200200   19.4200  147.2300      13.6        51       961        98
VIS    2025250    200200   19.4100  147.2100      14.7        51       961        99
VIS    2025250    200200   19.4100  147.1800      14.9        56       919        97
VIS    2025250    200200   19.4100  147.1600      15.2        56       834        93
VIS    2025250    200200   19.4100  147.1200      15.4        54       881        94
VIS    2025250    200200   19.4100  147.1100      15.4        54       895        95
VIS    2025250    200200   19.4100  147.0900      15.4        54       931        96
VIS    2025250    200200   19.4200  147.0600      15.5        53       943        97
VIS    2025250    200200   19.4000  145.2100      13.4       133       198        92
VIS    2025250    200200   19.3900  144.8600      13.1       130       191        93
VIS    2025250    200200   19.3800  144.7900      13.7       135       191        91
VIS    2025250    200200   19.4100  149.4800       8.7        62       981        90
VIS    2025250    200200   19.4300  149.4600       8.7        59       981        91
VIS    2025250    200200   19.4100  149.4000       9.0        57       974        90
VIS    2025250    200200   19.4200  149.3300       8.7        41       969        96
VIS    2025250    200200   19.4200  149.2300       8.5        47       996        99
VIS    2025250    200200   19.4000  149.2100       8.3        52       965        97
VIS    2025250    200200   19.4200  149.1900       8.6        61       945        94
VIS    2025250    200200   19.4100  149.1500       9.6        72       925        94
VIS    2025250    200200   19.4100  149.1500       9.5        72       926        94
VIS    2025250    200200   19.4000  149.1000       9.4        72       962        90
VIS    2025250    200200   19.4200  149.0800       8.9        65       979        90
VIS    2025250    200200   19.4200  149.0600       8.7        59       984        91
VIS    2025250    200200   19.4000  148.8400       8.6        58       987        92
VIS    2025250    200200   19.4000  148.8300       8.6        59       987        91
VIS    2025250    200200   19.4000  148.8000       9.2        60       993        94
VIS    2025250    200200   19.4100  148.7800       9.0        59       991        94
VIS    2025250    200200   19.4000  148.7400       8.8        56       964        98
VIS    2025250    200200   19.4000  148.7100       8.8        52       975        99
VIS    2025250    200200   19.4000  148.6700      10.3        52       991        98
VIS    2025250    200200   19.4200  148.6300       9.2        48       981        95
VIS    2025250    200200   19.4100  148.5400       8.4        75       975        90
VIS    2025250    200200   19.4100  148.5200       8.5        72       896        97
VIS    2025250    200200   19.4000  148.4900       8.5        71       869        98
VIS    2025250    200200   19.3900  148.4700       7.5        66       863        96
VIS    2025250    200200   19.4100  148.4500       7.7        63       847        95
VIS    2025250    200200   19.4000  148.4300       7.7        67       837        95
VIS    2025250    200200   19.3900  148.4000       7.3        76       856        93
VIS    2025250    200200   19.4100  148.3700       7.8        69       845        97
VIS    2025250    200200   19.4000  148.3400       8.5        67       872        98
VIS    2025250    200200   19.4000  148.3400       8.8        64       872        98
VIS    2025250    200200   19.3900  148.3000       9.6        69       883       100
VIS    2025250    200200   19.4100  148.2800       9.9        67       883       100
VIS    2025250    200200   19.4000  148.2600       9.7        71       882        99
VIS    2025250    200200   19.4000  148.2200      10.0        58       891        98
VIS    2025250    200200   19.3900  148.2100      10.0        56       889        98
VIS    2025250    200200   19.4000  148.1700       9.2        63       922        96
VIS    2025250    200200   19.4000  148.1400      10.4        54       902        97
VIS    2025250    200200   19.3900  148.1300      10.6        50       905        97
VIS    2025250    200200   19.3900  148.1100      11.0        44       929        97
VIS    2025250    200200   19.3900  148.0700      11.5        41       904        94
VIS    2025250    200200   19.3900  148.0600      12.0        41       895        93
VIS    2025250    200200   19.4000  148.0200      11.9        42       936        97
VIS    2025250    200200   19.4000  148.0000      11.7        45       948        98
VIS    2025250    200200   19.3900  147.9800      10.9        45       948        98
VIS    2025250    200200   19.3900  147.9600      10.7        45       948        98
VIS    2025250    200200   19.4000  147.9400      11.2        46       953        99
VIS    2025250    200200   19.3900  147.8900      11.7        50       948       100
VIS    2025250    200200   19.4000  147.8800      12.1        47       886        95
VIS    2025250    200200   19.4100  147.8600      12.3        44       910        95
VIS    2025250    200200   19.3900  147.8200      12.2        44       963        98
VIS    2025250    200200   19.4000  147.8000      12.5        44       959        98
VIS    2025250    200200   19.4000  147.7800      12.4        43       971        98
VIS    2025250    200200   19.4100  147.7600      12.7        44       963        97
VIS    2025250    200200   19.3900  147.7400      12.4        45       963        99
VIS    2025250    200200   19.4000  147.7100      12.7        50       963       100
VIS    2025250    200200   19.4100  147.6700      12.0        54       964        99
VIS    2025250    200200   19.3900  147.6600      12.3        54       890        98
VIS    2025250    200200   19.4000  147.6300      12.2        51       841        94
VIS    2025250    200200   19.3900  147.6200      12.0        50       863        95
VIS    2025250    200200   19.3900  147.4700      12.2        48       917        96
VIS    2025250    200200   19.3900  147.4700      12.3        48       917        96
VIS    2025250    200200   19.3900  147.4200      11.9        54       871        98
VIS    2025250    200200   19.4000  147.4000      12.3        57       844        98
VIS    2025250    200200   19.3800  147.3700      13.0        53       844        96
VIS    2025250    200200   19.3800  147.3500      12.8        53       898        97
VIS    2025250    200200   19.3900  147.3400      12.9        52       909        96
VIS    2025250    200200   19.4000  147.3200      12.9        53       918        95
VIS    2025250    200200   19.3900  147.2800      12.2        49       931        94
VIS    2025250    200200   19.3800  147.2500      13.3        50       946        99
VIS    2025250    200200   19.3900  147.2200      14.7        50       974       100
VIS    2025250    200200   19.3900  147.2100      15.0        51       961        97
VIS    2025250    200200   19.3900  147.1800      15.2        55       876        95
VIS    2025250    200200   19.3900  147.1700      15.3        56       834        93
VIS    2025250    200200   19.3800  147.1400      15.2        52       834        91
VIS    2025250    200200   19.3800  147.1000      15.5        53       924        96
VIS    2025250    200200   19.3800  147.1000      15.4        53       923        96
VIS    2025250    200200   19.4000  147.0600      15.0        52       847        91
VIS    2025250    200200   19.3600  145.2900      13.5       135       194        92
VIS    2025250    200200   19.3800  145.2100      12.2       137       194        93
VIS    2025250    200200   19.3800  145.1900      12.9       136       189        94
VIS    2025250    200200   19.3800  145.1700      14.1       129       189        90
VIS    2025250    200200   19.3700  144.8200      13.3       132       190        94
VIS    2025250    200200   19.3600  144.8000      13.1       135       190        93
VIS    2025250    200200   19.4000  149.4600       8.9        64       966        90
VIS    2025250    200200   19.3800  149.4200       8.7        62       946        91
VIS    2025250    200200   19.3800  149.3900       8.9        60       958        90
VIS    2025250    200200   19.3900  149.2900       8.9        56       975        92
VIS    2025250    200200   19.3900  149.2200       8.3        47       998        99
VIS    2025250    200200   19.3900  149.2000       8.3        52       943        95
VIS    2025250    200200   19.3900  149.1800       8.6        57       911        94
VIS    2025250    200200   19.4000  149.1600       8.9        66       908        99
VIS    2025250    200200   19.4000  149.1300       9.3        71       933        93
VIS    2025250    200200   19.3800  149.1100       9.2        72       962        90
VIS    2025250    200200   19.3800  149.0800       8.9        65       986        92
VIS    2025250    200200   19.3900  149.0500       8.4        53       995        97
VIS    2025250    200200   19.3800  148.8600       9.4        53       987        95
VIS    2025250    200200   19.3800  148.8400       9.2        54       987        96
VIS    2025250    200200   19.3900  148.8000       9.1        60       993        94
VIS    2025250    200200   19.3900  148.7700       9.1        60       950        96
VIS    2025250    200200   19.3900  148.7400       8.9        57       953        98
VIS    2025250    200200   19.3700  148.7300       8.6        52       961        99
VIS    2025250    200200   19.3900  148.6600      10.3        52       990        97
VIS    2025250    200200   19.3800  148.6300      10.4        40       990        94
VIS    2025250    200200   19.3700  148.5200       9.0        72       898        98
VIS    2025250    200200   19.3900  148.5200       8.7        72       896        98
VIS    2025250    200200   19.3700  148.4900       8.7        68       868        98
VIS    2025250    200200   19.3800  148.4500       7.2        63       837        94
VIS    2025250    200200   19.3700  148.4300       7.5        65       837        94
VIS    2025250    200200   19.3800  148.3900       7.4        74       867        93
VIS    2025250    200200   19.3700  148.3800       7.4        74       867        95
VIS    2025250    200200   19.3700  148.3500       8.3        62       867        91
VIS    2025250    200200   19.3700  148.3200       9.2        59       890        97
VIS    2025250    200200   19.3700  148.3000       9.2        66       886        99
VIS    2025250    200200   19.3800  148.2800       9.7        71       882        98
VIS    2025250    200200   19.3800  148.2700       9.7        70       882        99
VIS    2025250    200200   19.3700  148.2300      10.4        54       880        98
VIS    2025250    200200   19.3900  148.2100      10.1        54       889        97
VIS    2025250    200200   19.3800  148.1700       9.5        61       921        97
VIS    2025250    200200   19.3800  148.1500      10.1        55       905        98
VIS    2025250    200200   19.3800  148.1200      10.9        48       922        98
VIS    2025250    200200   19.3900  148.1000      11.2        44       938        98
VIS    2025250    200200   19.3700  148.0800      11.8        42       921        95
VIS    2025250    200200   19.3700  148.0600      12.0        41       904        94
VIS    2025250    200200   19.3800  148.0200      12.2        40       909        94
VIS    2025250    200200   19.3700  148.0100      11.9        41       934        96
VIS    2025250    200200   19.3600  147.9800      10.9        40       934        96
VIS    2025250    200200   19.3800  147.9600      10.5        43       939        97
VIS    2025250    200200   19.3700  147.9400      10.3        47       943        97
VIS    2025250    200200   19.3700  147.9200      10.6        51       953        99
VIS    2025250    200200   19.3700  147.8700      12.2        49       959        99
VIS    2025250    200200   19.3800  147.8100      12.4        44       969        98
VIS    2025250    200200   19.3800  147.7900      12.4        43       971        98
VIS    2025250    200200   19.3600  147.7600      12.0        42       956        98
VIS    2025250    200200   19.3800  147.7400      12.2        44       963        98
VIS    2025250    200200   19.3700  147.7100      12.6        47       956        98
VIS    2025250    200200   19.3600  147.6900      12.3        50       971       100
VIS    2025250    200200   19.3600  147.6600      11.9        57       931        98
VIS    2025250    200200   19.3700  147.6400      11.9        54       883        96
VIS    2025250    200200   19.3800  147.6200      11.9        50       871        96
VIS    2025250    200200   19.3600  147.5800      11.5        52       875        97
VIS    2025250    200200   19.3800  147.4800      12.1        50       917        96
VIS    2025250    200200   19.3700  147.4500      12.7        48       917        96
VIS    2025250    200200   19.3600  147.4500      12.8        48       904        96
VIS    2025250    200200   19.3700  147.4000      12.5        52       841        95
VIS    2025250    200200   19.3700  147.3800      12.9        53       844        96
VIS    2025250    200200   19.3700  147.3600      13.0        53       888        97
VIS    2025250    200200   19.3600  147.3300      12.9        51       898        95
VIS    2025250    200200   19.3700  147.3200      12.9        51       946        95
VIS    2025250    200200   19.3600  147.2900      12.8        52       959        98
VIS    2025250    200200   19.3600  147.2500      13.2        52       946        99
VIS    2025250    200200   19.3800  147.2300      14.4        50       974        99
VIS    2025250    200200   19.3800  147.2100      14.7        51       961        97
VIS    2025250    200200   19.3800  147.1800      14.7        54       890        92
VIS    2025250    200200   19.3600  147.1500      14.5        53       805        90
VIS    2025250    200200   19.3600  147.1000      15.4        53       923        96
VIS    2025250    200200   19.3600  147.1000      15.4        53       923        96
VIS    2025250    200200   19.3700  147.0800      15.4        54       870        94
VIS    2025250    200200   19.3400  145.3100      13.1       134       196        93
VIS    2025250    200200   19.3400  145.3000      13.3       135       196        91
VIS    2025250    200200   19.3700  149.4200       8.4        60       946        93
VIS    2025250    200200   19.3600  149.4000       8.5        62       964        90
VIS    2025250    200200   19.3800  149.3800       9.2        59       964        90
VIS    2025250    200200   19.3500  149.2600       9.2        45       998        94
VIS    2025250    200200   19.3600  149.2500       9.1        44       998        95
VIS    2025250    200200   19.3600  149.2200       8.6        38       995       100
VIS    2025250    200200   19.3700  149.2000       8.2        45       925        98
VIS    2025250    200200   19.3700  149.1600       8.5        52       907        99
VIS    2025250    200200   19.3600  149.1400       8.7        53       907        99
VIS    2025250    200200   19.3700  149.1100       9.1        69       962        91
VIS    2025250    200200   19.3600  149.1000       9.0        66       967        92
VIS    2025250    200200   19.3500  149.0400       8.9        42       995        99
VIS    2025250    200200   19.3500  148.8300       9.6        53       981        96
VIS    2025250    200200   19.3500  148.8200       9.5        55       981        95
VIS    2025250    200200   19.3600  148.7800       9.2        60       958        95
VIS    2025250    200200   19.3500  148.7600       9.0        55       955        97
VIS    2025250    200200   19.3500  148.7400       8.7        52       959        98
VIS    2025250    200200   19.3700  148.7300       8.6        51       962        98
VIS    2025250    200200   19.3700  148.6700       9.6        48       990       100
VIS    2025250    200200   19.3500  148.5500       8.4        77       965        90
VIS    2025250    200200   19.3600  148.5200       9.2        73       912        96
VIS    2025250    200200   19.3600  148.5000       9.6        73       879        99
VIS    2025250    200200   19.3500  148.4600       8.0        69       849        97
VIS    2025250    200200   19.3600  148.4300       7.6        65       837        95
VIS    2025250    200200   19.3600  148.4300       7.8        67       853        96
VIS    2025250    200200   19.3500  148.3900       7.4        72       900        95
VIS    2025250    200200   19.3600  148.3600       7.7        70       867        91
VIS    2025250    200200   19.3600  148.3500       8.1        66       867        92
VIS    2025250    200200   19.3600  148.3200       8.8        62       896        98
VIS    2025250    200200   19.3500  148.2800       9.6        65       878        99
VIS    2025250    200200   19.3400  148.2600      10.4        58       879        98
VIS    2025250    200200   19.3400  148.2500      10.3        57       879        98
VIS    2025250    200200   19.3400  148.2200      10.5        51       885        96
VIS    2025250    200200   19.3500  148.1800      10.2        55       921        98
VIS    2025250    200200   19.3600  148.1600       9.8        62       916        98
VIS    2025250    200200   19.3600  148.1400      10.3        59       912        99
VIS    2025250    200200   19.3400  148.1200      10.4        56       912        99
VIS    2025250    200200   19.3500  148.1000      11.3        49       938        99
VIS    2025250    200200   19.3400  148.0700      11.7        43       917        96
VIS    2025250    200200   19.3500  148.0500      12.0        43       916        96
VIS    2025250    200200   19.3500  148.0200      12.0        42       909        94
VIS    2025250    200200   19.3600  148.0000      11.8        40       934        96
VIS    2025250    200200   19.3500  147.9700      10.8        40       934        96
VIS    2025250    200200   19.3400  147.9500      10.6        42       933        96
VIS    2025250    200200   19.3600  147.9200      10.3        50       948        98
VIS    2025250    200200   19.3400  147.8800      11.8        48       948        99
VIS    2025250    200200   19.3400  147.7900      12.3        45       974        98
VIS    2025250    200200   19.3500  147.7800      12.0        43       969        98
VIS    2025250    200200   19.3500  147.7400      12.0        44       930        97
VIS    2025250    200200   19.3500  147.7100      12.6        46       944        97
VIS    2025250    200200   19.3500  147.7000      12.2        49       971       100
VIS    2025250    200200   19.3600  147.6600      11.9        56       931        98
VIS    2025250    200200   19.3600  147.6600      11.8        57       931        98
VIS    2025250    200200   19.3400  147.6200      11.2        52       879        95
VIS    2025250    200200   19.3500  147.5900      11.4        51       875        96
VIS    2025250    200200   19.3300  147.5600      12.4        53       875        97
VIS    2025250    200200   19.3500  147.4900      12.3        49       917        96
VIS    2025250    200200   19.3400  147.4600      12.6        45       923        95
VIS    2025250    200200   19.3500  147.4400      12.9        47       904        95
VIS    2025250    200200   19.3300  147.4300      12.7        47       904        95
VIS    2025250    200200   19.3300  147.4100      12.6        48       841        93
VIS    2025250    200200   19.3400  147.3700      12.9        50       856        95
VIS    2025250    200200   19.3400  147.3400      12.9        50       895        96
VIS    2025250    200200   19.3400  147.3300      12.9        50       895        96
VIS    2025250    200200   19.3400  147.3100      12.6        51       955        98
VIS    2025250    200200   19.3300  147.2600      13.4        53       900        98
VIS    2025250    200200   19.3300  147.2400      13.7        49       907        93
VIS    2025250    200200   19.3400  147.2400      13.5        48       957        97
VIS    2025250    200200   19.3400  147.1900      12.4        57       861        94
VIS    2025250    200200   19.3500  147.1200      14.6        51       900        92
VIS    2025250    200200   19.3300  147.1100      14.6        52       879        93
VIS    2025250    200200   19.3300  147.0800      15.0        54       860        94
VIS    2025250    200200   19.3400  147.0600      15.3        56       856        94
VIS    2025250    200200   19.3100  145.3300      13.5       135       196        90
VIS    2025250    200200   19.3300  145.3000      13.2       136       193        92
VIS    2025250    200200   19.3200  145.2900      13.2       137       193        91
VIS    2025250    200200   19.3200  145.2200      13.4       135       188        94
VIS    2025250    200200   19.3300  145.1900      12.8       138       189        95
VIS    2025250    200200   19.3200  144.4500      10.8       156       197        90
VIS    2025250    200200   19.3200  144.4300      11.8       148       197        90
VIS    2025250    200200   19.3500  149.4300       8.3        61       958        91
VIS    2025250    200200   19.3500  149.4200       8.1        59       958        93
VIS    2025250    200200   19.3500  149.2700       9.6        45       995        93
VIS    2025250    200200   19.3400  149.2400       8.7        38       998        97
VIS    2025250    200200   19.3400  149.2200       8.5        35       966        99
VIS    2025250    200200   19.3400  149.2100       8.4        34       966        98
VIS    2025250    200200   19.3300  149.1700       8.6        42       925        98
VIS    2025250    200200   19.3300  149.1600       9.0        45       920        98
VIS    2025250    200200   19.3400  149.1200       8.8        53       911        99
VIS    2025250    200200   19.3400  149.1000       8.6        54       939        99
VIS    2025250    200200   19.3500  149.0800       8.7        56       967        97
VIS    2025250    200200   19.3500  149.0400       9.0        45       978        99
VIS    2025250    200200   19.3500  149.0400       9.0        44       978        99
VIS    2025250    200200   19.3400  148.9700       9.4        70       951        91
VIS    2025250    200200   19.3400  148.8300       9.7        53       981        96
VIS    2025250    200200   19.3300  148.7900       9.7        55       973        95
VIS    2025250    200200   19.3300  148.7700       9.2        51       967        97
VIS    2025250    200200   19.3400  148.7600       8.9        52       958        98
VIS    2025250    200200   19.3200  148.5500       8.6        78       923        93
VIS    2025250    200200   19.3300  148.5300       9.3        76       910        95
VIS    2025250    200200   19.3400  148.5200       9.5        75       890        98
VIS    2025250    200200   19.3200  148.4800       8.7        78       864        98
VIS    2025250    200200   19.3300  148.4700       8.1        73       849        98
VIS    2025250    200200   19.3400  148.4300       7.7        63       853        96
VIS    2025250    200200   19.3300  148.4200       7.4        58       854        91
VIS    2025250    200200   19.3200  148.3800       7.1        65       879        92
VIS    2025250    200200   19.3200  148.3600       7.3        70       879        95
VIS    2025250    200200   19.3200  148.3200       7.8        68       900        96
VIS    2025250    200200   19.3200  148.3100       8.0        67       900        97
VIS    2025250    200200   19.3200  148.2800      10.3        55       880        97
VIS    2025250    200200   19.3200  148.2700      10.6        52       879        94
VIS    2025250    200200   19.3200  148.2300      10.0        56       885        96
VIS    2025250    200200   19.3200  148.2200       9.9        57       898        97
VIS    2025250    200200   19.3200  148.1800      10.5        57       909        99
VIS    2025250    200200   19.3200  148.1700      10.5        56       909        99
VIS    2025250    200200   19.3200  148.1200      10.4        52       914        98
VIS    2025250    200200   19.3200  148.1200      10.5        51       917        98
VIS    2025250    200200   19.3200  148.0800      10.7        44       921        96
VIS    2025250    200200   19.3300  148.0500      11.5        44       916        96
VIS    2025250    200200   19.3300  148.0400      11.6        44       916        96
VIS    2025250    200200   19.3200  148.0000      11.9        41       928        95
VIS    2025250    200200   19.3200  147.9900      11.7        40       928        95
VIS    2025250    200200   19.3300  147.9500      10.7        42       929        95
VIS    2025250    200200   19.3200  147.9400      10.6        40       929        95
VIS    2025250    200200   19.3200  147.9000      11.4        44       948        98
VIS    2025250    200200   19.3200  147.8900      11.5        44       948        99
VIS    2025250    200200   19.3200  147.7700      12.3        45       933        97
VIS    2025250    200200   19.3100  147.7700      12.4        44       933        97
VIS    2025250    200200   19.3300  147.7300      12.5        44       929        95
VIS    2025250    200200   19.3200  147.7000      12.5        50       958        99
VIS    2025250    200200   19.3100  147.6700      11.3        56       958        98
VIS    2025250    200200   19.3100  147.6700      11.1        57       958        98
VIS    2025250    200200   19.3100  147.6200      11.1        57       881        97
VIS    2025250    200200   19.3200  147.6200      11.2        56       879        97
VIS    2025250    200200   19.3200  147.5800      11.9        52       877        96
VIS    2025250    200200   19.3300  147.5600      12.4        53       875        97
VIS    2025250    200200   19.3200  147.5300      12.7        53       883        94
VIS    2025250    200200   19.3100  147.5100      12.3        52       880        93
VIS    2025250    200200   19.3100  147.4800      12.4        45       886        94
VIS    2025250    200200   19.3100  147.4500      12.5        46       905        95
VIS    2025250    200200   19.3300  147.4400      12.7        47       904        95
VIS    2025250    200200   19.3100  147.4200      12.6        47       895        95
VIS    2025250    200200   19.3300  147.4000      12.6        47       841        93
VIS    2025250    200200   19.3200  147.3500      12.9        49       851        94
VIS    2025250    200200   19.3200  147.3300      12.7        49       893        95
VIS    2025250    200200   19.3300  147.3200      12.7        51       895        95
VIS    2025250    200200   19.3300  147.2800      13.3        56       867        97
VIS    2025250    200200   19.3100  147.2700      12.1        59       850        99
VIS    2025250    200200   19.3300  147.2400      13.7        48       900        93
VIS    2025250    200200   19.3100  147.2100      12.3        55       861        93
VIS    2025250    200200   19.3000  147.1400      12.0        56       755        90
VIS    2025250    200200   19.3200  147.1100      14.7        52       879        93
VIS    2025250    200200   19.3200  147.0800      14.6        54       830        93
VIS    2025250    200200   19.3100  147.0800      14.3        57       788        92
VIS    2025250    200200   19.3000  144.4300      11.7       148       194        92
VIS    2025250    200200   19.3000  144.4200      13.0       141       194        91
VIS    2025250    200200   19.3200  149.9500       7.1        57       966        93
VIS    2025250    200200   19.3200  149.9300       7.0        57       966        93
VIS    2025250    200200   19.3100  149.5500       8.6        60       999        91
VIS    2025250    200200   19.3300  149.3500       9.3        60       965        90
VIS    2025250    200200   19.3100  149.3300       9.9        52       965        91
VIS    2025250    200200   19.3000  149.2700       8.7        37       985        97
VIS    2025250    200200   19.3200  149.2400       8.6        34       989        99
VIS    2025250    200200   19.3200  149.2300       8.6        33       981        99
VIS    2025250    200200   19.3200  149.2000       8.5        34       975        99
VIS    2025250    200200   19.3100  149.1600       9.0        49       946        98
VIS    2025250    200200   19.3200  149.1600       9.1        47       920        98
VIS    2025250    200200   19.3200  149.1300       9.1        52       907        99
VIS    2025250    200200   19.3100  149.1000       8.8        56       907       100
VIS    2025250    200200   19.3200  149.0600       8.7        48       973        99
VIS    2025250    200200   19.3000  148.9900       9.2        60       984        94
VIS    2025250    200200   19.3200  148.9700       9.4        67       976        91
VIS    2025250    200200   19.3000  148.8400       9.6        53       998        95
VIS    2025250    200200   19.3000  148.8300       9.4        53       979        96
VIS    2025250    200200   19.3200  148.7900       9.3        53       973        96
VIS    2025250    200200   19.3200  148.7800       9.2        52       979        97
VIS    2025250    200200   19.3100  148.7500       9.1        53       981        97
VIS    2025250    200200   19.3000  148.5800       7.2        69      1000        91
VIS    2025250    200200   19.3000  148.5500       8.6        77       910        93
VIS    2025250    200200   19.3200  148.5300       9.5        75       906        96
VIS    2025250    200200   19.3000  148.4900       9.1        76       871        97
VIS    2025250    200200   19.3100  148.4800       8.9        78       864        98
VIS    2025250    200200   19.2900  148.4500       8.0        68       857        97
VIS    2025250    200200   19.3100  148.3800       7.0        64       879        92
VIS    2025250    200200   19.3000  148.3400       7.2        67       889        95
VIS    2025250    200200   19.3100  148.3100       7.9        66       900        97
VIS    2025250    200200   19.2900  148.3100       7.8        65       907        96
VIS    2025250    200200   19.3100  148.2600      10.5        50       879        93
VIS    2025250    200200   19.3100  148.2600      10.3        51       879        95
VIS    2025250    200200   19.3100  148.2300       9.6        58       879        96
VIS    2025250    200200   19.3000  148.1900      10.2        60       909        99
VIS    2025250    200200   19.3100  148.1800      10.6        56       909        99
VIS    2025250    200200   19.2900  148.1400      10.4        52       899        97
VIS    2025250    200200   19.3100  148.1200      10.4        50       914        97
VIS    2025250    200200   19.3100  148.1100      10.3        49       917        97
VIS    2025250    200200   19.3100  148.0700      10.6        43       919        96
VIS    2025250    200200   19.2900  148.0400      11.6        46       921        97
VIS    2025250    200200   19.2900  148.0300      12.1        45       919        96
VIS    2025250    200200   19.2900  147.9900      11.9        42       933        96
VIS    2025250    200200   19.2900  147.9800      11.8        42       934        97
VIS    2025250    200200   19.3100  147.9500      10.9        40       933        95
VIS    2025250    200200   19.3000  147.9300      10.7        42       933        96
VIS    2025250    200200   19.2900  147.9100      10.7        44       933        97
VIS    2025250    200200   19.3100  147.8200      11.6        46       977        94
VIS    2025250    200200   19.3100  147.7700      12.5        44       933        97
VIS    2025250    200200   19.2900  147.7400      12.7        44       972        98
VIS    2025250    200200   19.2900  147.7300      12.9        45       938        96
VIS    2025250    200200   19.3000  147.7100      13.1        46       938        97
VIS    2025250    200200   19.3000  147.6700      11.7        53       940        98
VIS    2025250    200200   19.2900  147.6500      11.4        54       879        97
VIS    2025250    200200   19.3000  147.6200      11.1        58       881        98
VIS    2025250    200200   19.2900  147.5900      11.7        54       877        97
VIS    2025250    200200   19.2900  147.5900      11.9        54       877        97
VIS    2025250    200200   19.3000  147.5600      12.4        54       877        97
VIS    2025250    200200   19.3000  147.5400      12.5        56       880        94
VIS    2025250    200200   19.2800  147.4900      12.1        50       891        96
VIS    2025250    200200   19.3000  147.4700      12.4        46       886        95
VIS    2025250    200200   19.2800  147.4600      12.5        47       904        95
VIS    2025250    200200   19.3000  147.4300      12.7        49       904        96
VIS    2025250    200200   19.2800  147.4100      12.6        52       891        97
VIS    2025250    200200   19.2900  147.3800      11.5        56       824        96
VIS    2025250    200200   19.2800  147.3600      11.5        58       802        94
VIS    2025250    200200   19.3000  147.3300      12.1        52       826        90
VIS    2025250    200200   19.2900  147.2700      10.8        67       748        93
VIS    2025250    200200   19.2800  147.2700      10.3        71       742        94
VIS    2025250    200200   19.2800  147.2300      11.3        69       733        93
VIS    2025250    200200   19.3000  147.2200      11.8        61       853        95
VIS    2025250    200200   19.2700  145.4500      14.2       126       198        92
VIS    2025250    200200   19.2800  145.3700      14.1       133       195        91
VIS    2025250    200200   19.2800  144.4300      11.8       146       192        92
VIS    2025250    200200   19.2900  149.9600       7.1        57       966        93
VIS    2025250    200200   19.3000  149.9300       7.2        61       966        90
VIS    2025250    200200   19.2900  149.4700       9.2        67       940        90
VIS    2025250    200200   19.2900  149.4400       9.1        69       917        94
VIS    2025250    200200   19.2900  149.4200       8.9        67       945        90
VIS    2025250    200200   19.2800  149.3400       9.7        57       945        91
VIS    2025250    200200   19.2900  149.3400       9.7        57       945        92
VIS    2025250    200200   19.2900  149.3100      10.0        49       975        91
VIS    2025250    200200   19.3000  149.2700       8.7        38       985        97
VIS    2025250    200200   19.3000  149.2500       8.6        37       985        99
VIS    2025250    200200   19.2800  149.2400       8.8        41       985        99
VIS    2025250    200200   19.2800  149.1900       8.5        36       988        99
VIS    2025250    200200   19.2800  149.1900       8.4        38       988       100
VIS    2025250    200200   19.2800  149.1600       8.9        54       974        97
VIS    2025250    200200   19.2900  149.1300       8.6        53       907        99
VIS    2025250    200200   19.2900  149.0900       8.7        54       907       100
VIS    2025250    200200   19.2900  149.0700       8.7        55       944        99
VIS    2025250    200200   19.2900  149.0200       9.7        50       996        96
VIS    2025250    200200   19.2900  149.0200       9.5        51       996        96
VIS    2025250    200200   19.3000  148.9800       9.0        61       976        94
VIS    2025250    200200   19.2900  148.9700       9.0        61       976        94
VIS    2025250    200200   19.2700  148.8300      10.1        50       979        95
VIS    2025250    200200   19.2700  148.8100       9.8        48       978        97
VIS    2025250    200200   19.2800  148.8000       9.7        49       978        97
VIS    2025250    200200   19.2800  148.7600       9.1        56       970        96
VIS    2025250    200200   19.2700  148.7500       9.1        57       970        96
VIS    2025250    200200   19.2800  148.5900       8.0        60      1000        91
VIS    2025250    200200   19.2800  148.5600       8.1        72       917        93
VIS    2025250    200200   19.2800  148.5300       9.2        75       891        97
VIS    2025250    200200   19.2900  148.5100       9.4        76       872        97
VIS    2025250    200200   19.2900  148.4900       9.0        76       871        97
VIS    2025250    200200   19.2900  148.4700       8.8        76       866        97
VIS    2025250    200200   19.2800  148.4200       7.1        57       897        91
VIS    2025250    200200   19.2700  148.3400       7.5        68       913        95
VIS    2025250    200200   19.2700  148.3000       7.5        69       908        92
VIS    2025250    200200   19.2700  148.2900       7.8        61       906        95
VIS    2025250    200200   19.2700  148.2600      11.0        43       876        90
VIS    2025250    200200   19.2700  148.2400      10.9        46       879        94
VIS    2025250    200200   19.2700  148.2000      11.0        61       901        99
VIS    2025250    200200   19.2800  148.1800      10.5        59       905        99
VIS    2025250    200200   19.2800  148.1700      10.5        58       905        99
VIS    2025250    200200   19.2700  148.1500      10.2        52       894        97
VIS    2025250    200200   19.2700  148.1100       9.2        61       893        97
VIS    2025250    200200   19.2700  148.0800       8.6        60       928        95
VIS    2025250    200200   19.2700  148.0500      10.6        48       934        98
VIS    2025250    200200   19.2700  148.0500      11.0        47       933        98
VIS    2025250    200200   19.2700  148.0200      12.1        46       931        97
VIS    2025250    200200   19.2800  147.9900      12.0        43       934        97
VIS    2025250    200200   19.2800  147.9500      11.5        43       934        97
VIS    2025250    200200   19.2600  147.9300      11.9        47       928        98
VIS    2025250    200200   19.2700  147.9000      11.4        46       919        97
VIS    2025250    200200   19.2700  147.8800      11.5        44       928        97
VIS    2025250    200200   19.2800  147.7300      12.7        45       961        98
VIS    2025250    200200   19.2800  147.7300      12.7        46       961        98
VIS    2025250    200200   19.2700  147.6800      13.0        49       933        98
VIS    2025250    200200   19.2700  147.6600      12.2        48       918        96
VIS    2025250    200200   19.2600  147.6500      12.2        50       879        96
VIS    2025250    200200   19.2700  147.6100      12.2        53       872        97
VIS    2025250    200200   19.2800  147.5900      12.3        52       876        97
VIS    2025250    200200   19.2700  147.5600      12.1        55       876        98
VIS    2025250    200200   19.2600  147.5500      11.9        53       875        97
VIS    2025250    200200   19.2600  147.5200      11.9        49       886        96
VIS    2025250    200200   19.2700  147.4800      12.3        47       898        95
VIS    2025250    200200   19.2800  147.4700      12.4        47       900        95
VIS    2025250    200200   19.2800  147.4500      12.8        47       910        95
VIS    2025250    200200   19.2700  147.4300      13.3        49       905        96
VIS    2025250    200200   19.2700  147.4000      12.3        55       886        98
VIS    2025250    200200   19.2800  147.3600      11.4        60       792        93
VIS    2025250    200200   19.2800  147.3500      11.6        59       792        92
VIS    2025250    200200   19.2700  147.2700      10.6        69       717        93
VIS    2025250    200200   19.2700  147.2400      11.6        68       717        91
VIS    2025250    200200   19.2800  147.2300      11.4        70       717        93
VIS    2025250    200200   19.2500  145.5000      16.0       123       192        90
VIS    2025250    200200   19.2500  145.4600      14.5       124       194        92
VIS    2025250    200200   19.2400  145.2000      17.0       146       182        93
VIS    2025250    200200   19.2800  149.9400       6.8        47       966        94
VIS    2025250    200200   19.2600  149.6500       8.8        46       976        90
VIS    2025250    200200   19.2700  149.5000       9.5        61       943        92
VIS    2025250    200200   19.2800  149.5000       9.5        62       943        91
VIS    2025250    200200   19.2800  149.4700       9.3        63       913        96
VIS    2025250    200200   19.2700  149.4300       8.8        64       916        96
VIS    2025250    200200   19.2800  149.4200       8.8        65       945        91
VIS    2025250    200200   19.2800  149.3800       9.7        55       951        90
VIS    2025250    200200   19.2700  149.3700       9.5        55       944        91
VIS    2025250    200200   19.2700  149.2800       9.1        38       988        95
VIS    2025250    200200   19.2700  149.2500       8.8        38       988        96
VIS    2025250    200200   19.2600  149.2000       9.0        41       988        99
VIS    2025250    200200   19.2600  149.1800       8.9        43       974        99
VIS    2025250    200200   19.2500  149.1700       9.1        45       958        99
VIS    2025250    200200   19.2500  149.1300       8.7        50       893        97
VIS    2025250    200200   19.2600  149.1000       8.3        49       893        97
VIS    2025250    200200   19.2700  149.1000       8.2        52       893        98
VIS    2025250    200200   19.2600  149.0000       8.5        48       982        95
VIS    2025250    200200   19.2700  148.9800       8.6        57       976        95
VIS    2025250    200200   19.2700  148.9700       8.3        57       971        97
VIS    2025250    200200   19.2600  148.8300      10.1        48       991        96
VIS    2025250    200200   19.2700  148.8200      10.0        48       979        96
VIS    2025250    200200   19.2600  148.7600       9.1        52       970        97
VIS    2025250    200200   19.2500  148.7400       9.3        50       962       100
VIS    2025250    200200   19.2700  148.5900       8.6        55      1000        97
VIS    2025250    200200   19.2500  148.5700       9.0        54       995        98
VIS    2025250    200200   19.2500  148.5300       8.8        68       913        97
VIS    2025250    200200   19.2600  148.5200       9.2        76       891        97
VIS    2025250    200200   19.2700  148.4900       9.0        78       874        96
VIS    2025250    200200   19.2500  148.3700       7.3        74       872        95
VIS    2025250    200200   19.2600  148.3400       7.7        67       913        96
VIS    2025250    200200   19.2500  148.3100       7.5        66       949        92
VIS    2025250    200200   19.2500  148.2900       7.6        58       908        94
VIS    2025250    200200   19.2400  148.2800       9.1        45       866        94
VIS    2025250    200200   19.2500  148.2300      11.3        47       876        95
VIS    2025250    200200   19.2500  148.2300      11.6        49       879        95
VIS    2025250    200200   19.2400  148.2000      12.1        61       901       100
VIS    2025250    200200   19.2600  148.1700      10.6        58       901        99
VIS    2025250    200200   19.2600  148.1400      10.3        52       894        97
VIS    2025250    200200   19.2500  148.1300      10.4        52       889        97
VIS    2025250    200200   19.2400  148.1000       9.6        62       883        97
VIS    2025250    200200   19.2600  148.0800       8.6        62       928        95
VIS    2025250    200200   19.2400  148.0400      11.7        45       933        97
VIS    2025250    200200   19.2400  148.0300      12.0        43       943        97
VIS    2025250    200200   19.2600  147.9900      11.9        43       948        98
VIS    2025250    200200   19.2400  147.9800      11.7        42       948        98
VIS    2025250    200200   19.2400  147.9500      12.2        44       943        98
VIS    2025250    200200   19.2500  147.9300      12.2        47       928        98
VIS    2025250    200200   19.2400  147.8900      12.1        42       921        99
VIS    2025250    200200   19.2500  147.8600      12.1        41       945        97
VIS    2025250    200200   19.2400  147.8200      12.2        43       976        99
VIS    2025250    200200   19.2400  147.7100      12.4        49       961        98
VIS    2025250    200200   19.2400  147.7100      12.4        48       948        99
VIS    2025250    200200   19.2400  147.6600      12.6        49       917        96
VIS    2025250    200200   19.2600  147.6500      12.3        50       903        96
VIS    2025250    200200   19.2500  147.6200      12.4        52       860        96
VIS    2025250    200200   19.2400  147.5700      12.9        51       869        96
VIS    2025250    200200   19.2400  147.5600      12.7        51       872        96
VIS    2025250    200200   19.2400  147.5300      12.4        48       886        97
VIS    2025250    200200   19.2300  147.4900      12.8        44       886        94
VIS    2025250    200200   19.2500  147.4700      12.8        45       910        95
VIS    2025250    200200   19.2500  147.4600      12.9        46       910        95
VIS    2025250    200200   19.2400  147.4200      13.3        48       893        95
VIS    2025250    200200   19.2500  147.4000      12.5        52       891        97
VIS    2025250    200200   19.2500  147.3900      11.7        57       860        98
VIS    2025250    200200   19.2400  147.1100      14.6        56       774        90
VIS    2025250    200200   19.2300  145.2100      17.5       147       180        96
VIS    2025250    200200   19.2100  145.1000      18.4       154       176        94
VIS    2025250    200200   19.2100  144.9500      19.3       158       175        91
VIS    2025250    200200   19.2500  149.6600       8.6        50       981        90
VIS    2025250    200200   19.2500  149.6500       8.8        50       976        93
VIS    2025250    200200   19.2300  149.5300       8.7        69       913        93
VIS    2025250    200200   19.2400  149.5000       9.0        59       908        93
VIS    2025250    200200   19.2500  149.5000       9.3        56       913        95
VIS    2025250    200200   19.2300  149.4500       9.5        47       854        91
VIS    2025250    200200   19.2400  149.4300       9.1        55       873        96
VIS    2025250    200200   19.2500  149.4100       8.3        62       945        93
VIS    2025250    200200   19.2300  149.3900       8.3        60       913        94
VIS    2025250    200200   19.2300  149.3600       8.9        54       938        91
VIS    2025250    200200   19.2400  149.2500       9.2        40       988        99
VIS    2025250    200200   19.2500  149.2100       9.1        42       988        99
VIS    2025250    200200   19.2300  149.1800       9.8        40       989        95
VIS    2025250    200200   19.2300  149.1700       9.6        43       975        95
VIS    2025250    200200   19.2300  149.1400       9.4        50       934        96
VIS    2025250    200200   19.2400  149.1000       8.5        50       893        96
VIS    2025250    200200   19.2300  149.0800       8.9        54       895        99
VIS    2025250    200200   19.2300  148.7800      10.2        45       993        95
VIS    2025250    200200   19.2300  148.7700       9.9        46       993        95
VIS    2025250    200200   19.2200  148.5400       9.3        53       959        96
VIS    2025250    200200   19.2300  148.5400       9.2        56       940        97
VIS    2025250    200200   19.2400  148.5100       9.1        72       891        96
VIS    2025250    200200   19.2200  148.3700       7.8        73       880        95
VIS    2025250    200200   19.2200  148.3400       8.8        66       898        96
VIS    2025250    200200   19.2300  148.3400       8.9        65       898        97
VIS    2025250    200200   19.2200  148.2900       8.1        30       906        91
VIS    2025250    200200   19.2300  148.2500      10.7        41       866        96
VIS    2025250    200200   19.2400  148.2200      11.9        54       893        99
VIS    2025250    200200   19.2200  148.2000      11.6        58       896        99
VIS    2025250    200200   19.2200  148.1800      11.9        62       897        98
VIS    2025250    200200   19.2400  148.1600      11.1        60       892        99
VIS    2025250    200200   19.2200  148.1200      10.8        54       876        99
VIS    2025250    200200   19.2300  148.1000       9.7        59       883        96
VIS    2025250    200200   19.2200  148.0800       9.5        59       881        96
VIS    2025250    200200   19.2400  148.0400      11.6        46       931        99
VIS    2025250    200200   19.2400  148.0400      11.8        44       931       100
VIS    2025250    200200   19.2100  147.9900      11.7        39       963       100
VIS    2025250    200200   19.2300  147.9800      11.7        40       953       100
VIS    2025250    200200   19.2300  147.9500      12.2        43       948       100
VIS    2025250    200200   19.2200  147.9400      12.2        42       943       100
VIS    2025250    200200   19.2300  147.9000      12.2        43       921        99
VIS    2025250    200200   19.2300  147.8900      12.1        42       921        99
VIS    2025250    200200   19.2300  147.8600      12.0        39       936        98
VIS    2025250    200200   19.2300  147.8200      12.2        42       976        98
VIS    2025250    200200   19.2200  147.8000      12.0        45       971        99
VIS    2025250    200200   19.2200  147.7700      12.0        46       975        97
VIS    2025250    200200   19.2300  147.7000      12.4        47       948        99
VIS    2025250    200200   19.2200  147.6800      12.5        47       917        98
VIS    2025250    200200   19.2300  147.6600      12.6        50       915        98
VIS    2025250    200200   19.2300  147.6400      12.6        51       903        98
VIS    2025250    200200   19.2100  147.5500      13.0        46       883        97
VIS    2025250    200200   19.2300  147.5400      12.6        48       886        98
VIS    2025250    200200   19.2200  147.5000      12.9        44       883        97
VIS    2025250    200200   19.2200  147.4800      12.8        45       893        97
VIS    2025250    200200   19.2200  147.4600      12.7        47       902        97
VIS    2025250    200200   19.2200  147.4300      12.7        48       897        97
VIS    2025250    200200   19.2100  147.4000      12.4        49       835        97
VIS    2025250    200200   19.1900  145.4200      13.3       136       187        90
VIS    2025250    200200   19.2000  145.2000      18.2       149       179        93
VIS    2025250    200200   19.1900  145.1100      18.1       163       171        91
VIS    2025250    200200   19.2100  144.9500      19.0       159       175        92
VIS    2025250    200200   19.2000  144.7600      20.6       149       184        92
VIS    2025250    200200   19.2000  144.6200      17.8       135       185        90
VIS    2025250    200200   19.2000  144.5900      18.9       139       186        91
VIS    2025250    200200   19.2100  149.5600       8.7        66       944        90
VIS    2025250    200200   19.2200  149.5300       8.7        68       913        93
VIS    2025250    200200   19.2100  149.5200       8.8        68       854        94
VIS    2025250    200200   19.2300  149.5000       8.8        62       895        93
VIS    2025250    200200   19.2100  149.4500       9.3        44       854        91
VIS    2025250    200200   19.2100  149.4300       9.4        49       881        96
VIS    2025250    200200   19.2300  149.4000       8.7        59       901        97
VIS    2025250    200200   19.2100  149.3700       8.7        56       885        94
VIS    2025250    200200   19.2300  149.3500       9.2        54       933        93
VIS    2025250    200200   19.2300  149.2800       8.8        40       988        96
VIS    2025250    200200   19.2000  149.1500      10.1        48       945        92
VIS    2025250    200200   19.2200  149.1100       9.1        52       892        98
VIS    2025250    200200   19.2200  149.0900       9.0        52       895        99
VIS    2025250    200200   19.2200  149.0800       9.0        54       896        99
VIS    2025250    200200   19.2000  149.0500       8.7        55       929        96
VIS    2025250    200200   19.2100  148.8000      10.2        45       993        95
VIS    2025250    200200   19.2100  148.7700       9.7        48       993        95
VIS    2025250    200200   19.2000  148.5700       8.8        57       999        92
VIS    2025250    200200   19.2100  148.5300       8.9        50       940        98
VIS    2025250    200200   19.2100  148.5100       8.3        55       919        98
VIS    2025250    200200   19.2200  148.4900       8.6        70       892        96
VIS    2025250    200200   19.2100  148.3800       7.2        75       880        94
VIS    2025250    200200   19.2000  148.3600       8.2        67       890        97
VIS    2025250    200200   19.2000  148.3400       8.9        65       892        96
VIS    2025250    200200   19.2100  148.2600       9.8        34       862        90
VIS    2025250    200200   19.1900  148.2500       9.7        45       866        97
VIS    2025250    200200   19.2100  148.2100      11.3        54       893       100
VIS    2025250    200200   19.1900  148.1900      10.2        43       898        97
VIS    2025250    200200   19.2000  148.1800      10.9        45       897        98
VIS    2025250    200200   19.2000  148.1400      11.0        51       887        99
VIS    2025250    200200   19.2000  148.1300      10.7        54       876        99
VIS    2025250    200200   19.1900  148.0900       9.6        59       871        97
VIS    2025250    200200   19.2000  148.0600       9.5        55       881        97
VIS    2025250    200200   19.2000  148.0500      10.6        50       903        98
VIS    2025250    200200   19.2100  148.0100      12.0        40       943        99
VIS    2025250    200200   19.2100  147.9900      11.9        39       973        99
VIS    2025250    200200   19.2000  147.9700      12.4        39       973        99
VIS    2025250    200200   19.2100  147.9400      12.1        39       948        99
VIS    2025250    200200   19.1900  147.9100      12.0        44       946       100
VIS    2025250    200200   19.2000  147.8700      12.3        42       937        98
VIS    2025250    200200   19.2000  147.8500      12.1        41       965        99
VIS    2025250    200200   19.2000  147.8200      12.1        40       965       100
VIS    2025250    200200   19.1900  147.8000      12.2        41       952        99
VIS    2025250    200200   19.2100  147.7800      12.2        44       971        98
VIS    2025250    200200   19.2100  147.6900      12.4        46       964        99
VIS    2025250    200200   19.2100  147.6600      12.6        49       917        98
VIS    2025250    200200   19.2000  147.6600      12.7        50       917        98
VIS    2025250    200200   19.1900  147.6300      12.7        47       901        98
VIS    2025250    200200   19.2000  147.5700      13.1        47       863        98
VIS    2025250    200200   19.2000  147.5600      13.1        46       868        98
VIS    2025250    200200   19.1800  147.5200      13.0        47       880        98
VIS    2025250    200200   19.1800  147.5100      13.2        47       880        98
VIS    2025250    200200   19.1800  147.4800      13.0        46       882        98
VIS    2025250    200200   19.1900  147.4500      12.2        50       883        97
VIS    2025250    200200   19.2000  147.4300      12.0        50       883        97
VIS    2025250    200200   19.2000  147.4000      12.2        49       806        94
VIS    2025250    200200   19.1800  147.3800      11.4        51       763        91
VIS    2025250    200200   19.1600  145.3300      16.7       150       172        90
VIS    2025250    200200   19.1600  145.2100      17.6       158       169        93
VIS    2025250    200200   19.1800  145.1000      18.5       164       170        91
VIS    2025250    200200   19.1600  145.0800      18.4       165       168        91
VIS    2025250    200200   19.1800  145.0700      19.1       166       165        90
VIS    2025250    200200   19.1700  144.5100      19.1       152       188        93
VIS    2025250    200200   19.2000  149.5500       8.7        67       931        91
VIS    2025250    200200   19.2000  149.5200       9.1        67       843        94
VIS    2025250    200200   19.1800  149.4500       9.2        53       846        93
VIS    2025250    200200   19.1800  149.4300       9.3        50       873        95
VIS    2025250    200200   19.2000  149.4300       9.4        49       881        96
VIS    2025250    200200   19.2000  149.3900       9.3        57       881        96
VIS    2025250    200200   19.1900  149.3600       9.4        54       910        98
VIS    2025250    200200   19.1800  149.3500       9.6        55       913        97
VIS    2025250    200200   19.2000  149.1500      10.1        48       965        90
VIS    2025250    200200   19.1800  149.1200       9.5        52       902        98
VIS    2025250    200200   19.1800  149.0900       9.6        52       898        99
VIS    2025250    200200   19.1900  149.0800       9.5        52       899       100
VIS    2025250    200200   19.1900  148.7900       8.9        48       995        90
VIS    2025250    200200   19.1800  148.6000       9.1        53       996        94
VIS    2025250    200200   19.1700  148.5600       7.3        42       967        90
VIS    2025250    200200   19.1900  148.5400       8.6        46       961        98
VIS    2025250    200200   19.1900  148.5100       8.2        59       919        97
VIS    2025250    200200   19.1900  148.4900       8.3        68       919        94
VIS    2025250    200200   19.1900  148.3600       8.1        69       890        96
VIS    2025250    200200   19.1700  148.3400       8.7        68       890        95
VIS    2025250    200200   19.1800  148.3300       9.2        63       892        95
VIS    2025250    200200   19.1800  148.3000       7.8        34       954        96
VIS    2025250    200200   19.1800  148.2700       8.1        44       875        95
VIS    2025250    200200   19.1800  148.2300      10.9        54       873       100
VIS    2025250    200200   19.1700  148.2300      11.0        53       875       100
VIS    2025250    200200   19.1900  148.1900      10.2        44       898        97
VIS    2025250    200200   19.1800  148.1700      10.4        39       898        94
VIS    2025250    200200   19.1900  148.1400      10.7        52       891        98
VIS    2025250    200200   19.1900  148.1300      10.6        53       887        99
VIS    2025250    200200   19.1900  148.0900       9.7        58       871        98
VIS    2025250    200200   19.1800  148.0700       9.8        56       871        98
VIS    2025250    200200   19.1700  148.0500       9.9        49       903        97
VIS    2025250    200200   19.1700  148.0300      10.2        42       909        97
VIS    2025250    200200   19.1800  147.9800      12.7        39       974        98
VIS    2025250    200200   19.1700  147.9400      12.0        39       946        99
VIS    2025250    200200   19.1800  147.9100      11.7        43       946       100
VIS    2025250    200200   19.1600  147.8900      12.4        45       951        98
VIS    2025250    200200   19.1800  147.8600      12.4        43       951        97
VIS    2025250    200200   19.1800  147.8100      12.2        39       951        99
VIS    2025250    200200   19.1800  147.8100      12.2        40       951        99
VIS    2025250    200200   19.1700  147.7700      12.4        41       932        99
VIS    2025250    200200   19.1600  147.7500      12.3        41       948        98
VIS    2025250    200200   19.1700  147.6900      12.2        49       964        98
VIS    2025250    200200   19.1800  147.6600      12.3        48       932        98
VIS    2025250    200200   19.1800  147.6400      12.7        46       904        98
VIS    2025250    200200   19.1600  147.6200      12.8        45       897        97
VIS    2025250    200200   19.1700  147.5900      12.6        45       858        97
VIS    2025250    200200   19.1600  147.5700      12.8        46       850        97
VIS    2025250    200200   19.1800  147.5500      13.1        47       860        98
VIS    2025250    200200   19.1700  147.5100      13.0        48       876        98
VIS    2025250    200200   19.1700  147.5000      13.1        47       880        98
VIS    2025250    200200   19.1800  147.4800      12.9        46       882        98
VIS    2025250    200200   19.1800  147.4500      12.1        49       883        97
VIS    2025250    200200   19.1800  147.4400      11.8        50       874        98
VIS    2025250    200200   19.1700  147.4000      11.7        50       771        91
VIS    2025250    200200   19.1800  147.3800      11.4        51       760        91
VIS    2025250    200200   19.1400  145.3500      15.3       142       172        91
VIS    2025250    200200   19.1500  145.2700      13.1       139       172        94
VIS    2025250    200200   19.1400  145.2500      12.6       149       166        92
VIS    2025250    200200   19.1400  145.2200      14.4       162       166        94
VIS    2025250    200200   19.1600  145.2200      17.5       161       169        92
VIS    2025250    200200   19.1400  145.2000      15.9       164       169        91
VIS    2025250    200200   19.1400  145.1600      15.9       162       168        90
VIS    2025250    200200   19.1600  145.1100      18.3       164       170        91
VIS    2025250    200200   19.1500  145.0900      18.2       165       166        92
VIS    2025250    200200   19.1400  144.5400      17.6       150       185        96
VIS    2025250    200200   19.1400  144.5100      19.9       152       188        91
VIS    2025250    200200   19.1400  144.3900      19.3       150       189        92
VIS    2025250    200200   19.1500  144.2900      18.8       154       195        90
VIS    2025250    200200   19.1600  149.5400       9.3        66       917        90
VIS    2025250    200200   19.1700  149.5100       9.2        65       843        92
VIS    2025250    200200   19.1800  149.4800       8.3        63       835        92
VIS    2025250    200200   19.1800  149.4500       9.1        54       846        93
VIS    2025250    200200   19.1800  149.4300       9.2        52       873        96
VIS    2025250    200200   19.1600  149.4100       9.6        57       873        95
VIS    2025250    200200   19.1800  149.3900       9.5        57       881        95
VIS    2025250    200200   19.1700  149.3600       9.4        53       902        97
VIS    2025250    200200   19.1700  149.3400       9.7        57       943        91
VIS    2025250    200200   19.1500  149.2000       9.3        49       987        93
VIS    2025250    200200   19.1500  149.1900       9.3        50       987        92
VIS    2025250    200200   19.1700  149.1600       9.7        51       981        91
VIS    2025250    200200   19.1500  149.1400       9.2        52       909        97
VIS    2025250    200200   19.1600  149.1000       9.3        53       898        99
VIS    2025250    200200   19.1700  149.0700       9.6        53       899        99
VIS    2025250    200200   19.1600  149.0500       9.1        55       913        99
VIS    2025250    200200   19.1600  149.0300       8.3        58       948        90
VIS    2025250    200200   19.1700  148.7400       8.9        47       995        97
VIS    2025250    200200   19.1600  148.6000       8.6        52       993        95
VIS    2025250    200200   19.1600  148.5000       8.5        61       919        96
VIS    2025250    200200   19.1600  148.5000       8.5        64       919        95
VIS    2025250    200200   19.1400  148.3800       8.3        66       981        90
VIS    2025250    200200   19.1600  148.3600       8.3        69       890        96
VIS    2025250    200200   19.1500  148.3500       8.2        74       890        94
VIS    2025250    200200   19.1500  148.2800       8.2        63       883        92
VIS    2025250    200200   19.1500  148.2600       9.5        62       880        99
VIS    2025250    200200   19.1600  148.2300      10.9        56       875        99
VIS    2025250    200200   19.1600  148.2000      10.3        45       903        97
VIS    2025250    200200   19.1600  148.2000      10.2        43       912        97
VIS    2025250    200200   19.1600  148.1700      10.0        44       923        96
VIS    2025250    200200   19.1500  148.1300      10.1        60       891        98
VIS    2025250    200200   19.1400  148.1200      10.2        61       891        98
VIS    2025250    200200   19.1500  148.0800      10.7        60       875        99
VIS    2025250    200200   19.1500  148.0500      10.4        49       896        98
VIS    2025250    200200   19.1400  148.0300      10.2        41       909        97
VIS    2025250    200200   19.1400  147.9900      10.4        37       973        99
VIS    2025250    200200   19.1400  147.9600      12.2        40       965        98
VIS    2025250    200200   19.1500  147.9300      11.8        40       938        99
VIS    2025250    200200   19.1500  147.9000      11.7        43       947        99
VIS    2025250    200200   19.1400  147.8600      12.9        43       955        98
VIS    2025250    200200   19.1400  147.8500      13.1        44       955        98
VIS    2025250    200200   19.1500  147.8000      12.3        43       929        96
VIS    2025250    200200   19.1500  147.8000      12.4        42       922        96
VIS    2025250    200200   19.1500  147.7700      12.3        43       921        96
VIS    2025250    200200   19.1600  147.7500      12.3        42       936        97
VIS    2025250    200200   19.1600  147.6200      12.9        46       897        97
VIS    2025250    200200   19.1600  147.5900      12.6        46       858        98
VIS    2025250    200200   19.1600  147.5600      12.7        47       850        97
VIS    2025250    200200   19.1400  147.5500      12.9        46       836        96
VIS    2025250    200200   19.1400  147.5100      13.1        47       868        98
VIS    2025250    200200   19.1500  147.5000      13.1        46       874        98
VIS    2025250    200200   19.1500  147.4600      12.4        45       820        93
VIS    2025250    200200   19.1400  147.4400      12.1        47       786        90
VIS    2025250    200200   19.1300  147.4300      11.6        50       771        90
VIS    2025250    200200   19.1200  145.4000      15.8       136       169        92
VIS    2025250    200200   19.1200  145.3300      13.7       142       169        93
VIS    2025250    200200   19.1300  145.2900      13.2       135       169        94
VIS    2025250    200200   19.1200  145.2700      13.6       144       166        93
VIS    2025250    200200   19.1200  145.2400      13.7       152       166        95
VIS    2025250    200200   19.1200  145.2400      14.1       154       166        90
VIS    2025250    200200   19.1300  145.2100      14.8       160       166        95
VIS    2025250    200200   19.1100  145.1700      15.0       162       166        90
VIS    2025250    200200   19.1100  145.1400      15.7       164       162        92
VIS    2025250    200200   19.1300  145.1100      16.6       166       165        92
VIS    2025250    200200   19.1100  145.0800      15.1       168       164        92
VIS    2025250    200200   19.1300  145.0500      16.9       171       165        90
VIS    2025250    200200   19.1300  144.5700      12.0       132       182        92
VIS    2025250    200200   19.1200  144.3600      19.3       146       189        90
VIS    2025250    200200   19.1100  144.2900      20.8       144       194        90
VIS    2025250    200200   19.1500  149.7300       8.2        61       978        90
VIS    2025250    200200   19.1300  149.5400       9.6        67       916        92
VIS    2025250    200200   19.1400  149.5200       9.8        67       851        92
VIS    2025250    200200   19.1400  149.4700       8.8        65       836        90
VIS    2025250    200200   19.1300  149.4400       9.3        60       843        94
VIS    2025250    200200   19.1500  149.4100       9.6        57       895        98
VIS    2025250    200200   19.1400  149.4000       9.9        54       895        96
VIS    2025250    200200   19.1400  149.3600      10.1        47       912        93
VIS    2025250    200200   19.1300  149.3400       9.8        46       934        90
VIS    2025250    200200   19.1300  149.2800       8.8        45       967        94
VIS    2025250    200200   19.1400  149.2700       8.8        41       979        96
VIS    2025250    200200   19.1500  149.2400       8.7        33       989        90
VIS    2025250    200200   19.1500  149.1900       9.2        51       987        92
VIS    2025250    200200   19.1500  149.1700       9.2        52       970        93
VIS    2025250    200200   19.1500  149.1400       9.1        53       909        97
VIS    2025250    200200   19.1400  149.1300       8.9        54       901        95
VIS    2025250    200200   19.1300  149.1000       8.5        47       899        97
VIS    2025250    200200   19.1500  149.0600       9.0        53       899        99
VIS    2025250    200200   19.1300  149.0400       8.4        50       904        96
VIS    2025250    200200   19.1400  148.5500       8.4        28       968        90
VIS    2025250    200200   19.1400  148.5100       8.8        64       951        92
VIS    2025250    200200   19.1400  148.5000       8.5        61       922        96
VIS    2025250    200200   19.1300  148.3800       8.6        63       981        91
VIS    2025250    200200   19.1200  148.3500       8.6        72       922        92
VIS    2025250    200200   19.1200  148.3400       8.4        74       905        93
VIS    2025250    200200   19.1300  148.3200       8.4        73       922        92
VIS    2025250    200200   19.1200  148.2900       9.4        57       935        96
VIS    2025250    200200   19.1300  148.2600       9.6        62       915        93
VIS    2025250    200200   19.1400  148.2300      10.4        55       903        98
VIS    2025250    200200   19.1400  148.2200      10.5        50       903        98
VIS    2025250    200200   19.1200  148.1800      11.8        36       939        98
VIS    2025250    200200   19.1200  148.1600      11.5        42       938       100
VIS    2025250    200200   19.1200  148.1300      11.0        58       907        98
VIS    2025250    200200   19.1300  148.1200      10.7        61       893        98
VIS    2025250    200200   19.1200  148.1000      10.4        60       884        98
VIS    2025250    200200   19.1200  148.0700      10.8        51       897        99
VIS    2025250    200200   19.1200  148.0500      11.2        45       901        98
VIS    2025250    200200   19.1400  148.0200      10.2        41       909        97
VIS    2025250    200200   19.1300  148.0000      10.1        38       969        99
VIS    2025250    200200   19.1300  147.9600      11.9        43       979        99
VIS    2025250    200200   19.1200  147.9400      11.5        41       936        99
VIS    2025250    200200   19.1200  147.9100      11.1        37       931        98
VIS    2025250    200200   19.1300  147.8800      12.3        41       955        99
VIS    2025250    200200   19.1300  147.8600      12.8        42       955        99
VIS    2025250    200200   19.1300  147.8500      13.0        43       955        98
VIS    2025250    200200   19.1300  147.8100      12.5        43       929        98
VIS    2025250    200200   19.1200  147.7800      12.8        46       929        96
VIS    2025250    200200   19.1300  147.7800      12.7        45       924        96
VIS    2025250    200200   19.1300  147.7300      11.9        41       948        96
VIS    2025250    200200   19.1200  147.7200      11.9        41       948        96
VIS    2025250    200200   19.1300  147.7000      12.4        42       952        98
VIS    2025250    200200   19.1300  147.6100      13.0        47       880        98
VIS    2025250    200200   19.1200  147.5900      12.8        48       866        98
VIS    2025250    200200   19.1300  147.5700      12.4        47       836        96
VIS    2025250    200200   19.1300  147.5500      12.7        46       836        96
VIS    2025250    200200   19.1300  147.5200      12.9        46       863        98
VIS    2025250    200200   19.1100  147.4900      12.4        47       838        97
VIS    2025250    200200   19.1100  147.4800      12.3        47       820        95
VIS    2025250    200200   19.1200  147.4300      12.1        49       777        90
VIS    2025250    200200   19.1100  147.4000      12.1        51       768        92
VIS    2025250    200200   19.1300  147.3600      11.7        55       707        90
VIS    2025250    200200   19.1000  145.5200      12.4       139       174        91
VIS    2025250    200200   19.1100  145.4900      14.2       134       174        95
VIS    2025250    200200   19.0900  145.4500      15.8       141       168        96
VIS    2025250    200200   19.1000  145.3900      15.5       134       169        90
VIS    2025250    200200   19.0900  145.3400      13.5       140       164        96
VIS    2025250    200200   19.0900  145.3200      13.2       141       164        96
VIS    2025250    200200   19.0900  145.3100      13.1       139       164        96
VIS    2025250    200200   19.1000  145.2900      13.1       137       164        96
VIS    2025250    200200   19.1000  145.2500      14.0       151       164        92
VIS    2025250    200200   19.0900  145.2300      15.3       153       161        98
VIS    2025250    200200   19.0900  145.2200      14.8       153       161        97
VIS    2025250    200200   19.0900  145.1800      15.1       160       162        96
VIS    2025250    200200   19.1000  145.1600      15.6       162       162        92
VIS    2025250    200200   19.1000  145.1400      15.8       163       162        93
VIS    2025250    200200   19.0900  145.1200      15.0       163       159        94
VIS    2025250    200200   19.1100  145.0800      14.9       167       164        92
VIS    2025250    200200   19.1000  145.0700      15.0       168       161        93
VIS    2025250    200200   19.0900  144.9600      15.1       173       164        90
VIS    2025250    200200   19.1100  144.9500      16.6       173       164        90
VIS    2025250    200200   19.1000  144.3900      18.1       157       188        94
VIS    2025250    200200   19.1300  149.7200       8.2        57       965        92
VIS    2025250    200200   19.1200  149.5300       9.6        66       881        96
VIS    2025250    200200   19.1100  149.5000       9.4        66       873        94
VIS    2025250    200200   19.1100  149.4500       9.7        65       836        92
VIS    2025250    200200   19.1300  149.4200       9.5        59       873        96
VIS    2025250    200200   19.1200  149.3900       9.9        55       895        96
VIS    2025250    200200   19.1100  149.3800      10.0        52       924        94
VIS    2025250    200200   19.1300  149.3400      10.0        45       933        93
VIS    2025250    200200   19.1300  149.3300       9.7        48       934        92
VIS    2025250    200200   19.1300  149.3000       9.1        47       943        91
VIS    2025250    200200   19.1200  149.2800       9.0        44       948        94
VIS    2025250    200200   19.1200  149.2400       9.1        39       997        94
VIS    2025250    200200   19.1100  149.2400       9.3        41       997        94
VIS    2025250    200200   19.1100  149.1900       9.8        55       961        91
VIS    2025250    200200   19.1000  149.1900       9.8        57       955        92
VIS    2025250    200200   19.1000  149.1600       9.4        59       912        97
VIS    2025250    200200   19.1200  149.1300       8.9        55       905        97
VIS    2025250    200200   19.1200  149.1000       8.5        50       904        96
VIS    2025250    200200   19.1200  149.0800       8.1        43       904        98
VIS    2025250    200200   19.1000  149.0500       8.2        53       910        99
VIS    2025250    200200   19.1000  149.0400       8.6        58       914        96
VIS    2025250    200200   19.1000  148.5400       9.4        49       989        93
VIS    2025250    200200   19.1000  148.5000       8.7        55       955        94
VIS    2025250    200200   19.1100  148.5000       8.5        58       931        93
VIS    2025250    200200   19.1100  148.3800       8.7        64       981        90
VIS    2025250    200200   19.1100  148.3500       8.5        71       922        93
VIS    2025250    200200   19.1100  148.3500       8.4        70       922        93
VIS    2025250    200200   19.1000  148.3100       8.9        57       935        97
VIS    2025250    200200   19.0900  148.2900       9.6        49       935        99
VIS    2025250    200200   19.1100  148.2700      10.1        55       915        99
VIS    2025250    200200   19.1100  148.2300      10.0        53       915        98
VIS    2025250    200200   19.1000  148.2100      11.1        41       946        98
VIS    2025250    200200   19.1100  148.1800      11.9        36       943        98
VIS    2025250    200200   19.1100  148.1600      11.6        42       939       100
VIS    2025250    200200   19.1100  148.1300      11.0        57       907        99
VIS    2025250    200200   19.1100  148.1200      10.9        56       901        99
VIS    2025250    200200   19.0900  148.1000      10.7        48       897        99
VIS    2025250    200200   19.0900  148.0600      10.8        45       911        98
VIS    2025250    200200   19.0900  148.0500      11.1        44       909        99
VIS    2025250    200200   19.1100  148.0100      10.6        39       949        99
VIS    2025250    200200   19.1100  147.9900      10.5        38       949        99
VIS    2025250    200200   19.0900  147.9600      12.0        44       979        99
VIS    2025250    200200   19.1100  147.9400      11.7        41       931        99
VIS    2025250    200200   19.0900  147.9100      11.9        35       919        95
VIS    2025250    200200   19.0900  147.9000      11.6        35       914        93
VIS    2025250    200200   19.1000  147.8700      12.3        40       942        99
VIS    2025250    200200   19.0900  147.8400      12.5        41       934        99
VIS    2025250    200200   19.0900  147.8100      12.5        43       927        99
VIS    2025250    200200   19.1000  147.8000      12.8        45       927        99
VIS    2025250    200200   19.1000  147.7800      13.3        46       929        98
VIS    2025250    200200   19.0900  147.7500      13.0        44       942        99
VIS    2025250    200200   19.0900  147.7100      12.3        43       905        96
VIS    2025250    200200   19.1000  147.5900      12.7        48       866        98
VIS    2025250    200200   19.1000  147.5600      12.1        52       814        96
VIS    2025250    200200   19.1000  147.5400      11.9        54       802        93
VIS    2025250    200200   19.1000  147.5100      12.0        53       838        97
VIS    2025250    200200   19.1000  147.4800      12.2        48       801        92
VIS    2025250    200200   19.0900  147.4700      12.0        47       801        90
VIS    2025250    200200   19.0900  147.4300      12.4        48       775        90
VIS    2025250    200200   19.0900  147.4300      12.5        47       774        90
VIS    2025250    200200   19.0800  147.3900      13.2        47       800        91
VIS    2025250    200200   19.0700  145.7700      14.4       121       191        92
VIS    2025250    200200   19.0900  145.6200      12.8       128       188        92
VIS    2025250    200200   19.0900  145.5400      15.1       135       174        96
VIS    2025250    200200   19.0700  145.5100      13.1       136       170        95
VIS    2025250    200200   19.0700  145.4900      13.4       136       168        94
VIS    2025250    200200   19.0800  145.4700      14.9       134       168        97
VIS    2025250    200200   19.0800  145.4500      15.6       140       168        95
VIS    2025250    200200   19.0900  145.4300      15.7       145       168        92
VIS    2025250    200200   19.0800  145.4100      15.2       142       165        92
VIS    2025250    200200   19.0700  145.3500      14.4       141       164        97
VIS    2025250    200200   19.0800  145.3200      14.1       143       163        96
VIS    2025250    200200   19.0600  145.3000      15.2       148       160        96
VIS    2025250    200200   19.0800  145.2700      14.7       147       159        96
VIS    2025250    200200   19.0800  145.2500      15.0       151       159        94
VIS    2025250    200200   19.0800  145.2300      16.1       153       160        97
VIS    2025250    200200   19.0600  145.2200      15.7       154       156        97
VIS    2025250    200200   19.0800  145.1800      15.1       159       162        96
VIS    2025250    200200   19.0600  145.1500      14.7       159       159        97
VIS    2025250    200200   19.0800  145.1300      14.8       162       159        93
VIS    2025250    200200   19.0800  145.1200      14.1       161       159        95
VIS    2025250    200200   19.0700  145.0900      13.2       162       156        95
VIS    2025250    200200   19.0800  145.0500      14.1       167       159        90
VIS    2025250    200200   19.0700  145.0100      13.0       168       159        90
VIS    2025250    200200   19.0700  144.9700      14.5       171       159        90
VIS    2025250    200200   19.0700  144.9000      15.5       173       163        90
VIS    2025250    200200   19.0800  144.9000      16.2       174       163        90
VIS    2025250    200200   19.0600  144.5600      13.0       140       174        90
VIS    2025250    200200   19.0600  144.5300      12.8       144       174        95
VIS    2025250    200200   19.0700  144.4400      19.4       162       190        90
VIS    2025250    200200   19.0600  144.3300      20.5       155       191        90
VIS    2025250    200200   19.0800  144.2900      20.7       147       194        90
VIS    2025250    200200   19.0800  149.5500       9.5        66       915        93
VIS    2025250    200200   19.0900  149.5300       9.3        65       892        97
VIS    2025250    200200   19.0900  149.5100       9.1        64       878        97
VIS    2025250    200200   19.0800  149.4500       9.8        61       841        91
VIS    2025250    200200   19.1000  149.4200       9.8        63       846        93
VIS    2025250    200200   19.0800  149.4000       9.6        60       892        97
VIS    2025250    200200   19.1000  149.3800       9.6        53       930        92
VIS    2025250    200200   19.0900  149.3400       8.9        41       941        98
VIS    2025250    200200   19.0900  149.3200       8.6        42       941        99
VIS    2025250    200200   19.0900  149.3000       9.0        45       941        97
VIS    2025250    200200   19.0900  149.2800       9.6        47       945        94
VIS    2025250    200200   19.1000  149.2500       9.4        42       985        94
VIS    2025250    200200   19.1000  149.2300       9.7        43       997        97
VIS    2025250    200200   19.0900  149.2000      10.0        51       961        93
VIS    2025250    200200   19.0900  149.1800       9.9        57       955        91
VIS    2025250    200200   19.0800  149.1400       9.4        60       912        97
VIS    2025250    200200   19.0800  149.1400       9.3        59       912        97
VIS    2025250    200200   19.0800  149.1000       8.5        50       912        96
VIS    2025250    200200   19.0900  149.0700       8.0        48       914        98
VIS    2025250    200200   19.0800  149.0600       8.2        51       914        96
VIS    2025250    200200   19.1000  149.0400       8.6        59       914        97
VIS    2025250    200200   19.0800  148.9900       8.8        44       951        96
VIS    2025250    200200   19.0900  148.5300       9.4        46       989        92
VIS    2025250    200200   19.0700  148.5100       8.4        57       977        91
VIS    2025250    200200   19.0700  148.3600      10.2        38       957       100
VIS    2025250    200200   19.0800  148.3400       9.2        54       901        98
VIS    2025250    200200   19.0800  148.3400       9.2        53       922        96
VIS    2025250    200200   19.0800  148.2900       9.1        47       935        98
VIS    2025250    200200   19.0700  148.2600      10.3        41       969        94
VIS    2025250    200200   19.0800  148.2400      10.8        43       969        95
VIS    2025250    200200   19.0700  148.2000      11.3        41       970       100
VIS    2025250    200200   19.0800  148.1800      11.4        39       958       100
VIS    2025250    200200   19.0700  148.1600      11.2        38       951        99
VIS    2025250    200200   19.0700  148.1200      11.1        41       934        99
VIS    2025250    200200   19.0900  148.0900      10.8        46       901        99
VIS    2025250    200200   19.0700  148.0900      10.9        43       914        98
VIS    2025250    200200   19.0700  148.0500      11.0        41       911        98
VIS    2025250    200200   19.0700  148.0400      11.1        43       911        98
VIS    2025250    200200   19.0700  148.0000      11.0        43       916        99
VIS    2025250    200200   19.0700  147.9700      11.5        44       947       100
VIS    2025250    200200   19.0900  147.9400      12.5        42       947        99
VIS    2025250    200200   19.0800  147.9300      12.4        36       929        97
VIS    2025250    200200   19.0800  147.9100      12.2        35       919        95
VIS    2025250    200200   19.0800  147.8800      12.3        41       931        98
VIS    2025250    200200   19.0600  147.8400      12.8        41       922        97
VIS    2025250    200200   19.0800  147.8300      12.5        41       934        99
VIS    2025250    200200   19.0700  147.8100      12.4        42       922        99
VIS    2025250    200200   19.0600  147.7900      12.6        42       919        99
VIS    2025250    200200   19.0600  147.7600      12.7        44       916        99
VIS    2025250    200200   19.0600  147.7200      12.3        45       895        97
VIS    2025250    200200   19.0700  147.5500      11.3        62       724        94
VIS    2025250    200200   19.0600  147.5400      11.2        64       724        96
VIS    2025250    200200   19.0700  147.5200      11.0        73       737        99
VIS    2025250    200200   19.0700  147.4000      13.2        46       799        91
VIS    2025250    200200   19.0600  147.3800      12.8        47       800        92
VIS    2025250    200200   19.0500  145.9900      10.6        90       195        92
VIS    2025250    200200   19.0500  145.9700      10.3        97       194        97
VIS    2025250    200200   19.0600  145.9600      10.0        95       194        96
VIS    2025250    200200   19.0500  145.9400      11.2        86       194        96
VIS    2025250    200200   19.0600  145.7000      15.5       138       183        90
VIS    2025250    200200   19.0400  145.5500      13.3       134       167        97
VIS    2025250    200200   19.0600  145.5300      13.4       135       170        97
VIS    2025250    200200   19.0600  145.5100      13.1       136       170        96
VIS    2025250    200200   19.0600  145.4900      13.5       135       168        94
VIS    2025250    200200   19.0400  145.4600      14.9       140       164        92
VIS    2025250    200200   19.0400  145.4000      14.5       138       165        92
VIS    2025250    200200   19.0400  145.3600      15.2       136       164        96
VIS    2025250    200200   19.0500  145.3500      14.8       143       162        96
VIS    2025250    200200   19.0600  145.3100      15.4       148       160        95
VIS    2025250    200200   19.0400  145.2900      16.7       153       157        96
VIS    2025250    200200   19.0600  145.2800      15.9       151       157        96
VIS    2025250    200200   19.0500  145.2300      15.3       150       155        97
VIS    2025250    200200   19.0500  145.2200      15.7       152       156        97
VIS    2025250    200200   19.0500  145.1900      14.5       155       155        96
VIS    2025250    200200   19.0500  145.1700      14.0       157       157        96
VIS    2025250    200200   19.0600  145.1500      14.4       158       157        97
VIS    2025250    200200   19.0400  145.1300      13.5       154       154        95
VIS    2025250    200200   19.0500  145.1100      13.7       159       154        95
VIS    2025250    200200   19.0600  145.0800      13.8       165       154        95
VIS    2025250    200200   19.0500  145.0500      11.9       166       155        92
VIS    2025250    200200   19.0400  145.0100      12.8       166       158        93
VIS    2025250    200200   19.0500  144.9900      14.6       170       158        90
VIS    2025250    200200   19.0400  144.9700      15.4       172       158        92
VIS    2025250    200200   19.0400  144.9600      15.5       172       158        92
VIS    2025250    200200   19.0400  144.3300      20.4       155       191        90
VIS    2025250    200200   19.0600  149.8700       7.1        50       959        91
VIS    2025250    200200   19.0800  149.7200       7.9        53       960        92
VIS    2025250    200200   19.0600  149.5200       8.9        60       878        93
VIS    2025250    200200   19.0700  149.5000       9.0        62       842        91
VIS    2025250    200200   19.0700  149.4000       9.7        60       912        95
VIS    2025250    200200   19.0800  149.3800       9.0        51       930        94
VIS    2025250    200200   19.0600  149.3500       8.4        42       944        97
VIS    2025250    200200   19.0600  149.3100       8.5        44       945        98
VIS    2025250    200200   19.0800  149.3000       8.8        45       941        97
VIS    2025250    200200   19.0700  149.2700       9.6        48       945        93
VIS    2025250    200200   19.0700  149.2600      10.0        48       945        92
VIS    2025250    200200   19.0600  149.2100       9.4        49       945        98
VIS    2025250    200200   19.0600  149.2000       9.0        49       945        98
VIS    2025250    200200   19.0500  149.1700       8.8        52       955        96
VIS    2025250    200200   19.0600  149.1400       8.8        56       955        93
VIS    2025250    200200   19.0600  149.1300       8.7        54       932        96
VIS    2025250    200200   19.0700  149.1000       8.7        53       910        96
VIS    2025250    200200   19.0700  149.0800       8.4        48       910        95
VIS    2025250    200200   19.0700  149.0600       8.3        47       912        92
VIS    2025250    200200   19.0500  149.0200       8.6        40       932       100
VIS    2025250    200200   19.0500  149.0000       8.7        44       952        98
VIS    2025250    200200   19.0600  148.9800       8.6        43       966        93
VIS    2025250    200200   19.0500  148.8600       8.0        29       986        94
VIS    2025250    200200   19.0600  148.7900       9.1        50       986        94
VIS    2025250    200200   19.0600  148.3600      10.8        38       891        91
VIS    2025250    200200   19.0600  148.3200       9.2        50       901        94
VIS    2025250    200200   19.0600  148.3200       9.1        52       912        96
VIS    2025250    200200   19.0600  148.2700       9.2        45       960        92
VIS    2025250    200200   19.0500  148.2200      11.0        42       978        98
VIS    2025250    200200   19.0600  148.2000      11.1        42       970       100
VIS    2025250    200200   19.0500  148.1900      11.1        43       970       100
VIS    2025250    200200   19.0600  148.1500      11.1        38       942        99
VIS    2025250    200200   19.0600  148.1400      11.0        38       941        99
VIS    2025250    200200   19.0500  148.1000      11.0        39       942        99
VIS    2025250    200200   19.0500  148.0800      11.0        39       949       100
VIS    2025250    200200   19.0600  148.0500      11.1        41       911        98
VIS    2025250    200200   19.0600  148.0300      11.1        44       903        98
VIS    2025250    200200   19.0600  148.0200      10.9        44       903        98
VIS    2025250    200200   19.0400  147.9900      10.9        44       903        98
VIS    2025250    200200   19.0600  147.9700      11.4        46       947       100
VIS    2025250    200200   19.0600  147.9300      11.7        41       939        99
VIS    2025250    200200   19.0500  147.9200      11.3        43       939       100
VIS    2025250    200200   19.0500  147.8800      11.8        37       932        97
VIS    2025250    200200   19.0600  147.8700      12.3        40       932        98
VIS    2025250    200200   19.0600  147.8400      12.9        41       922        97
VIS    2025250    200200   19.0600  147.8000      12.4        41       919        99
VIS    2025250    200200   19.0600  147.7900      12.5        41       916        98
VIS    2025250    200200   19.0500  147.7700      12.3        41       912        98
VIS    2025250    200200   19.0400  147.7400      12.1        44       886        97
VIS    2025250    200200   19.0400  147.7000      12.6        44       875        97
VIS    2025250    200200   19.0500  147.5300      11.1        58       718        93
VIS    2025250    200200   19.0500  147.3800      12.6        47       799        92
VIS    2025250    200200   19.0500  147.3700      12.6        49       799        93
VIS    2025250    200200   19.0400  145.9900      10.7        93       195        94
VIS    2025250    200200   19.0300  145.9700      11.0        97       194        98
VIS    2025250    200200   19.0300  145.9300      11.7        88       195        97
VIS    2025250    200200   19.0200  145.9200      12.7        90       195        98
VIS    2025250    200200   19.0200  145.8600      12.1       104       194        98
VIS    2025250    200200   19.0300  145.8400      13.3       121       194        91
VIS    2025250    200200   19.0200  145.7200      14.7       135       184        90
VIS    2025250    200200   19.0400  145.7000      14.1       135       184        92
VIS    2025250    200200   19.0300  145.6100      15.8       136       177        90
VIS    2025250    200200   19.0200  145.5600      13.9       134       166        98
VIS    2025250    200200   19.0300  145.5400      13.2       134       166        96
VIS    2025250    200200   19.0300  145.5100      13.1       134       164        93
VIS    2025250    200200   19.0400  145.4900      14.1       135       163        95
VIS    2025250    200200   19.0400  145.4700      14.8       139       163        94
VIS    2025250    200200   19.0400  145.4400      15.3       142       164        90
VIS    2025250    200200   19.0200  145.4100      15.3       142       162        92
VIS    2025250    200200   19.0200  145.4000      15.2       138       162        95
VIS    2025250    200200   19.0300  145.3700      14.6       135       162        96
VIS    2025250    200200   19.0200  145.3400      15.0       145       160        92
VIS    2025250    200200   19.0200  145.3200      16.8       152       156        96
VIS    2025250    200200   19.0300  145.3100      17.0       153       157        96
VIS    2025250    200200   19.0200  145.2800      17.3       155       154        96
VIS    2025250    200200   19.0200  145.2500      13.4       147       152        94
VIS    2025250    200200   19.0300  145.2300      14.5       149       153        96
VIS    2025250    200200   19.0100  145.2000      13.3       152       153        94
VIS    2025250    200200   19.0200  145.1900      13.2       153       152        96
VIS    2025250    200200   19.0200  145.1600      12.9       151       152        96
VIS    2025250    200200   19.0100  145.1200      13.3       157       153        94
VIS    2025250    200200   19.0100  145.0100      12.7       161       160        93
VIS    2025250    200200   19.0200  144.9700      13.9       171       158        92
VIS    2025250    200200   19.0300  144.9700      14.8       171       158        92
VIS    2025250    200200   19.0200  144.3000      18.3       146       191        93
VIS    2025250    200200   19.0200  144.2800      19.1       146       191        93
VIS    2025250    200200   19.0300  144.2600      20.1       148       191        90
VIS    2025250    200200   19.0400  149.6100       8.3        57       989        91
VIS    2025250    200200   19.0500  149.5200       8.9        60       878        93
VIS    2025250    200200   19.0300  149.5000       8.8        56       854        91
VIS    2025250    200200   19.0300  149.4400      10.2        54       885        90
VIS    2025250    200200   19.0300  149.4200      10.7        52       916        90
VIS    2025250    200200   19.0500  149.3900      10.0        56       918        92
VIS    2025250    200200   19.0500  149.3700       9.3        52       919        92
VIS    2025250    200200   19.0500  149.3500       8.7        44       933        97
VIS    2025250    200200   19.0500  149.3200       8.7        45       945        96
VIS    2025250    200200   19.0400  149.2900       9.1        45       939        97
VIS    2025250    200200   19.0400  149.2800       9.1        46       937        97
VIS    2025250    200200   19.0400  149.2600       9.1        48       938        96
VIS    2025250    200200   19.0400  149.2300       9.0        50       941        98
VIS    2025250    200200   19.0500  149.2100       9.1        49       945        98
VIS    2025250    200200   19.0500  149.1700       8.6        52       953        96
VIS    2025250    200200   19.0300  149.1500       8.3        46       917        99
VIS    2025250    200200   19.0300  149.1100       8.6        50       932        99
VIS    2025250    200200   19.0300  149.1100       8.5        51       932        98
VIS    2025250    200200   19.0300  149.0600       8.8        41       920        98
VIS    2025250    200200   19.0400  149.0300       8.9        35       920        97
VIS    2025250    200200   19.0400  149.0000       8.7        42       952        99
VIS    2025250    200200   19.0300  148.9800       8.4        41       993        96
VIS    2025250    200200   19.0300  148.8400       8.4        42       995        97
VIS    2025250    200200   19.0300  148.7600       9.2        49       999        94
VIS    2025250    200200   19.0400  148.3600      11.0        39       891        93
VIS    2025250    200200   19.0400  148.3300       9.0        54       891        96
VIS    2025250    200200   19.0200  148.3200       8.9        59       912        95
VIS    2025250    200200   19.0200  148.3000       8.7        58       925        97
VIS    2025250    200200   19.0200  148.2700       9.1        50       971        95
VIS    2025250    200200   19.0200  148.2300      11.0        43       972        99
VIS    2025250    200200   19.0200  148.2100      10.9        46       966        99
VIS    2025250    200200   19.0200  148.1900      11.1        45       959        99
VIS    2025250    200200   19.0400  148.1600      11.3        41       949        99
VIS    2025250    200200   19.0300  148.1400      10.9        41       941        99
VIS    2025250    200200   19.0300  148.1300      10.9        41       942        99
VIS    2025250    200200   19.0400  148.0900      10.9        39       949        99
VIS    2025250    200200   19.0200  148.0600      11.5        42       939        99
VIS    2025250    200200   19.0200  148.0500      11.8        43       911        97
VIS    2025250    200200   19.0400  148.0300      11.6        42       903        98
VIS    2025250    200200   19.0300  147.9900      11.0        44       903        98
VIS    2025250    200200   19.0400  147.9800      11.1        45       917        99
VIS    2025250    200200   19.0200  147.9400      11.7        49       921       100
VIS    2025250    200200   19.0400  147.9200      11.4        46       939       100
VIS    2025250    200200   19.0300  147.9000      11.4        39       939        98
VIS    2025250    200200   19.0100  147.8600      11.3        39       957       100
VIS    2025250    200200   19.0100  147.8500      11.6        39       957       100
VIS    2025250    200200   19.0200  147.8100      12.6        40       904        96
VIS    2025250    200200   19.0200  147.7900      12.0        37       891        94
VIS    2025250    200200   19.0300  147.7600      12.0        40       886        96
VIS    2025250    200200   19.0100  147.7400      12.3        40       873        95
VIS    2025250    200200   19.0300  147.7300      12.3        44       875        96
VIS    2025250    200200   19.0100  146.0100       8.9        82       196        92
VIS    2025250    200200   19.0100  145.9900      11.4        96       195        99
VIS    2025250    200200   19.0000  145.9700      12.2        96       195       100
VIS    2025250    200200   19.0100  145.9400      11.6        96       194        99
VIS    2025250    200200   19.0000  145.9300      12.1        95       194        99
VIS    2025250    200200   19.0000  145.8900      13.9        90       194        96
VIS    2025250    200200   19.0100  145.8700      12.8        98       194        99
VIS    2025250    200200   19.0000  145.7400      14.5       134       186        90
VIS    2025250    200200   19.0100  145.7200      14.8       135       184        90
VIS    2025250    200200   19.0000  145.5800      13.1       133       168        91
VIS    2025250    200200   19.0000  145.5500      13.8       136       165        95
VIS    2025250    200200   18.9900  145.5400      13.9       136       163        95
VIS    2025250    200200   19.0100  145.5000      14.8       138       162        96
VIS    2025250    200200   18.9900  145.4800      15.5       141       160        96
VIS    2025250    200200   19.0000  145.4500      15.7       142       161        91
VIS    2025250    200200   19.0000  145.4000      15.1       138       161        95
VIS    2025250    200200   19.0000  145.3900      14.9       137       161        97
VIS    2025250    200200   19.0000  145.3500      14.4       144       156        94
VIS    2025250    200200   18.9900  145.3200      15.5       148       152        96
VIS    2025250    200200   18.9900  145.3100      16.0       149       152        97
VIS    2025250    200200   18.9900  145.2900      16.5       152       150        97
VIS    2025250    200200   18.9900  145.2600      15.0       151       150        94
VIS    2025250    200200   18.9900  145.2300      14.2       150       149        98
VIS    2025250    200200   19.0000  145.2000      13.7       150       151        97
VIS    2025250    200200   18.9900  145.2000      13.7       151       151        98
VIS    2025250    200200   19.0100  145.1600      13.2       151       152        96
VIS    2025250    200200   19.0000  145.1300      13.1       157       153        95
VIS    2025250    200200   18.9900  145.1200      13.1       158       153        94
VIS    2025250    200200   18.9900  145.0100      12.5       161       160        93
VIS    2025250    200200   18.9900  144.9800      11.3       166       160        91
VIS    2025250    200200   19.0000  144.9800      12.0       168       160        91
VIS    2025250    200200   19.0100  144.9400      11.9       166       161        90
VIS    2025250    200200   18.9900  144.9200      11.2       155       161        92
VIS    2025250    200200   19.0000  144.8200      17.3       147       166        92
VIS    2025250    200200   18.9900  144.8000      16.1       145       167        96
VIS    2025250    200200   18.9800  144.4800      20.1       155       184        91
VIS    2025250    200200   18.9900  144.2600      16.8       142       194        96
VIS    2025250    200200   19.0300  149.5500       9.1        57       936        90
VIS    2025250    200200   19.0300  149.5100       8.6        53       859        94
VIS    2025250    200200   19.0100  149.4800       8.7        54       852        92
VIS    2025250    200200   19.0300  149.4400      10.2        54       895        92
VIS    2025250    200200   19.0100  149.4000      10.6        51       924        92
VIS    2025250    200200   19.0100  149.3600       9.8        45       933        95
VIS    2025250    200200   19.0100  149.3500       9.5        44       933        96
VIS    2025250    200200   19.0100  149.3300       9.3        41       939        97
VIS    2025250    200200   19.0200  149.2900       9.2        45       933        96
VIS    2025250    200200   19.0100  149.2700       9.0        45       921        97
VIS    2025250    200200   19.0200  149.2500       9.1        48       933        96
VIS    2025250    200200   19.0100  149.2200       9.0        51       940        97
VIS    2025250    200200   19.0100  149.2000       8.9        50       926        99
VIS    2025250    200200   19.0300  149.1600       8.4        48       917        99
VIS    2025250    200200   19.0100  149.1400       8.4        46       917        98
VIS    2025250    200200   19.0000  149.1200       8.5        48       917        97
VIS    2025250    200200   19.0200  149.1000       8.5        52       932        97
VIS    2025250    200200   19.0000  149.0600       8.8        48       955        94
VIS    2025250    200200   19.0200  149.0400       9.2        38       952        99
VIS    2025250    200200   19.0200  149.0300       9.1        38       952        99
VIS    2025250    200200   19.0000  148.9500       9.5        51       992        91
VIS    2025250    200200   19.0000  148.8100       8.7        41       995        98
VIS    2025250    200200   19.0100  148.8000       8.6        44       999        97
VIS    2025250    200200   19.0000  148.7700       9.2        48       976        95
VIS    2025250    200200   19.0000  148.3800      13.4        28       959        91
VIS    2025250    200200   19.0100  148.3100       8.8        58       925        96
VIS    2025250    200200   19.0000  148.2800       8.1        55       971        93
VIS    2025250    200200   18.9900  148.2700       8.4        49       971        94
VIS    2025250    200200   19.0100  148.2500      10.4        39       972        98
VIS    2025250    200200   18.9900  148.2100      11.2        38       966       100
VIS    2025250    200200   18.9900  148.2000      11.3        39       959       100
VIS    2025250    200200   19.0000  148.1700      11.4        45       952       100
VIS    2025250    200200   19.0000  148.1500      11.0        45       944       100
VIS    2025250    200200   18.9900  148.1100      10.7        41       941        99
VIS    2025250    200200   19.0100  148.0900      10.7        39       942        98
VIS    2025250    200200   19.0000  148.0600      11.6        43       942        99
VIS    2025250    200200   19.0100  148.0600      11.7        43       911        98
VIS    2025250    200200   19.0100  148.0100      11.5        44       890        98
VIS    2025250    200200   19.0000  147.9900      11.3        42       897        97
VIS    2025250    200200   19.0000  147.9600      11.8        44       906        99
VIS    2025250    200200   19.0000  147.9600      11.9        45       906        99
VIS    2025250    200200   19.0000  147.9100      12.0        41       937        99
VIS    2025250    200200   19.0000  147.9000      11.8        40       939        98
VIS    2025250    200200   18.9900  147.8600      11.4        40       946        99
VIS    2025250    200200   19.0100  147.8500      11.5        39       957       100
VIS    2025250    200200   18.9900  147.8300      12.3        41       936        99
VIS    2025250    200200   19.0000  147.7900      12.4        38       879        94
VIS    2025250    200200   19.0100  147.7800      12.2        37       879        94
VIS    2025250    200200   18.9900  147.7500      12.5        39       872        94
VIS    2025250    200200   18.9900  147.7100      12.5        39       874        94
VIS    2025250    200200   18.9900  147.7000      12.6        40       878        93
VIS    2025250    200200   18.9700  145.9900      11.7        90       195        97
VIS    2025250    200200   18.9800  145.9700      12.2        93       194        99
VIS    2025250    200200   18.9900  145.9400      11.9        96       194        99
VIS    2025250    200200   18.9900  145.9300      12.4        93       194        99
VIS    2025250    200200   18.9900  145.8800      13.2        99       194        99
VIS    2025250    200200   18.9700  145.5500      14.6       137       162        97
VIS    2025250    200200   18.9800  145.5200      14.9       137       162        97
VIS    2025250    200200   18.9800  145.5000      15.3       138       161        98
VIS    2025250    200200   18.9700  145.4900      15.6       139       160        98
VIS    2025250    200200   18.9800  145.4500      15.3       141       159        90
VIS    2025250    200200   18.9900  145.4500      15.4       142       159        90
VIS    2025250    200200   18.9700  145.4000      14.4       139       159        97
VIS    2025250    200200   18.9700  145.4000      14.2       139       159        97
VIS    2025250    200200   18.9700  145.3700      14.2       142       157        96
VIS    2025250    200200   18.9800  145.3300      15.2       146       152        94
VIS    2025250    200200   18.9900  145.3100      16.2       149       150        97
VIS    2025250    200200   18.9700  145.2900      15.3       149       150        96
VIS    2025250    200200   18.9600  145.2700      14.4       148       148        95
VIS    2025250    200200   18.9800  145.2400      14.0       149       149        95
VIS    2025250    200200   18.9800  145.2200      14.7       151       149        99
VIS    2025250    200200   18.9800  145.2000      14.2       152       149        99
VIS    2025250    200200   18.9600  145.1600      13.2       149       153        97
VIS    2025250    200200   18.9700  145.1500      12.8       150       153        96
VIS    2025250    200200   18.9800  145.1200      12.8       157       153        96
VIS    2025250    200200   18.9700  145.1000      13.4       157       155        96
VIS    2025250    200200   18.9600  145.0400      13.1       155       157        92
VIS    2025250    200200   18.9600  144.8800      15.1       140       166        98
VIS    2025250    200200   18.9700  144.8600      14.9       136       164        97
VIS    2025250    200200   18.9800  144.8300      15.0       136       166        91
VIS    2025250    200200   18.9700  144.7700      18.1       152       168        97
VIS    2025250    200200   18.9800  144.7500      18.1       151       168        97
VIS    2025250    200200   18.9700  144.7400      17.5       149       168        92
VIS    2025250    200200   18.9700  144.6700      10.7       162       169        92
VIS    2025250    200200   18.9800  144.5000      19.3       153       184        93
VIS    2025250    200200   18.9700  144.4700      20.4       157       185        90
VIS    2025250    200200   19.0000  149.5200       8.3        43       888        94
VIS    2025250    200200   19.0000  149.5100       8.4        44       868        92
VIS    2025250    200200   18.9800  149.4200       9.4        52       906        93
VIS    2025250    200200   19.0000  149.4100      10.3        50       921        91
VIS    2025250    200200   19.0000  149.3500       9.3        42       933        97
VIS    2025250    200200   18.9800  149.3200       9.0        40       960        95
VIS    2025250    200200   18.9800  149.2900       8.9        41       955        95
VIS    2025250    200200   19.0000  149.2800       9.2        44       934        96
VIS    2025250    200200   19.0000  149.2500       9.4        47       934        95
VIS    2025250    200200   19.0000  149.2200       9.1        51       940        97
VIS    2025250    200200   19.0000  149.1900       9.1        51       926        99
VIS    2025250    200200   19.0000  149.1800       9.0        50       918       100
VIS    2025250    200200   18.9900  149.1500       8.9        48       910        99
VIS    2025250    200200   18.9800  149.1300       8.7        49       909        99
VIS    2025250    200200   18.9800  149.1100       8.6        50       917        96
VIS    2025250    200200   18.9900  149.0300       9.0        43       964        96
VIS    2025250    200200   18.9900  148.9900       8.9        44       986        97
VIS    2025250    200200   18.9900  148.9200       9.1        55       992        90
VIS    2025250    200200   18.9900  148.7900       8.7        44       989        96
VIS    2025250    200200   18.9800  148.7800       8.8        47       976        96
VIS    2025250    200200   19.0000  148.7700       9.3        48       976        95
VIS    2025250    200200   18.9800  148.3900       9.3        32       975        98
VIS    2025250    200200   18.9800  148.3700      10.3        35       904        94
VIS    2025250    200200   18.9800  148.3400      10.4        47       877        92
VIS    2025250    200200   18.9700  148.2700       8.2        45       971        93
VIS    2025250    200200   18.9800  148.2100      11.3        35       972        99
VIS    2025250    200200   18.9800  148.1900      11.5        39       959       100
VIS    2025250    200200   18.9900  148.1500      11.0        45       946       100
VIS    2025250    200200   18.9700  148.1200      11.1        43       937        99
VIS    2025250    200200   18.9900  148.1100      10.8        41       941        99
VIS    2025250    200200   18.9800  148.0800      11.1        40       965        99
VIS    2025250    200200   18.9800  148.0600      11.4        42       965        99
VIS    2025250    200200   18.9700  148.0300      11.8        45       907        99
VIS    2025250    200200   18.9800  147.9900      11.8        41       897        97
VIS    2025250    200200   18.9800  147.9900      11.8        41       907        98
VIS    2025250    200200   18.9800  147.9600      12.0        41       903        97
VIS    2025250    200200   18.9800  147.9300      12.0        42       921        99
VIS    2025250    200200   18.9900  147.9000      11.9        42       942       100
VIS    2025250    200200   18.9700  147.8700      12.0        41       942       100
VIS    2025250    200200   18.9700  147.8600      12.0        41       944        99
VIS    2025250    200200   18.9800  147.8400      12.0        42       939        99
VIS    2025250    200200   18.9800  147.8100      12.7        41       898        97
VIS    2025250    200200   18.9700  147.7900      12.7        41       881        96
VIS    2025250    200200   18.9600  147.7500      12.5        40       873        95
VIS    2025250    200200   18.9700  147.7200      12.4        39       875        93
VIS    2025250    200200   18.9800  147.7100      12.5        40       874        94
VIS    2025250    200200   18.9700  147.6900      12.6        42       889        93
VIS    2025250    200200   18.9500  146.0700      10.2        92       191        94
VIS    2025250    200200   18.9500  146.0700      10.2        91       191        93
VIS    2025250    200200   18.9500  146.0400      10.8        82       191        90
VIS    2025250    200200   18.9500  146.0100      11.4        80       192        92
VIS    2025250    200200   18.9500  145.9800      11.9        86       193        95
VIS    2025250    200200   18.9500  145.9700      12.1        88       193        96
VIS    2025250    200200   18.9700  145.9400      11.9        93       192        96
VIS    2025250    200200   18.9500  145.9100      14.2        85       194        94
VIS    2025250    200200   18.9400  145.6900      13.1       126       173        90
VIS    2025250    200200   18.9400  145.5900      12.5       125       165        94
VIS    2025250    200200   18.9500  145.5700      14.0       129       163        95
VIS    2025250    200200   18.9600  145.5500      14.7       137       162        96
VIS    2025250    200200   18.9500  145.5100      14.9       135       160        98
VIS    2025250    200200   18.9600  145.5000      15.2       137       160        98
VIS    2025250    200200   18.9600  145.4700      14.8       138       160        95
VIS    2025250    200200   18.9600  145.4200      14.5       140       158        93
VIS    2025250    200200   18.9500  145.3800      14.1       140       158        97
VIS    2025250    200200   18.9500  145.3800      14.1       140       158        97
VIS    2025250    200200   18.9600  145.3500      14.6       144       152        94
VIS    2025250    200200   18.9600  145.3200      14.8       146       146        96
VIS    2025250    200200   18.9600  145.3100      14.4       146       145        97
VIS    2025250    200200   18.9500  145.2700      13.8       147       147        94
VIS    2025250    200200   18.9500  145.2400      14.5       148       149        96
VIS    2025250    200200   18.9600  145.2200      14.9       148       150        99
VIS    2025250    200200   18.9400  145.1900      14.7       149       151        99
VIS    2025250    200200   18.9400  145.1800      14.7       150       152        99
VIS    2025250    200200   18.9400  145.1400      13.2       150       152        96
VIS    2025250    200200   18.9500  145.1400      12.9       151       153        95
VIS    2025250    200200   18.9600  145.1100      13.4       158       153        96
VIS    2025250    200200   18.9400  145.0900      13.2       157       155        96
VIS    2025250    200200   18.9400  145.0600      13.4       156       156        97
VIS    2025250    200200   18.9400  144.9400      15.8       152       160        99
VIS    2025250    200200   18.9400  144.9300      15.4       155       161        98
VIS    2025250    200200   18.9600  144.8700      15.6       139       166        99
VIS    2025250    200200   18.9600  144.7900      19.5       152       167        90
VIS    2025250    200200   18.9500  144.7500      17.4       151       168        97
VIS    2025250    200200   18.9500  144.7300      16.2       146       168        91
VIS    2025250    200200   18.9400  144.4800      20.7       155       184        90
VIS    2025250    200200   18.9800  149.6200       8.6        31       984        93
VIS    2025250    200200   18.9800  149.6100       8.2        40       983        91
VIS    2025250    200200   18.9800  149.5200       8.4        46       919        95
VIS    2025250    200200   18.9800  149.4200       9.3        52       895        94
VIS    2025250    200200   18.9800  149.4100       9.4        52       921        93
VIS    2025250    200200   18.9800  149.3200       8.9        40       980        95
VIS    2025250    200200   18.9600  149.2900       9.1        41       980        96
VIS    2025250    200200   18.9800  149.2800       9.0        42       955        95
VIS    2025250    200200   18.9600  149.2600       9.2        47       957        94
VIS    2025250    200200   18.9700  149.2200       9.7        51       957        94
VIS    2025250    200200   18.9600  149.1900       9.4        51       938        97
VIS    2025250    200200   18.9600  149.1800       9.2        51       936        98
VIS    2025250    200200   18.9800  149.1500       9.0        52       909        99
VIS    2025250    200200   18.9800  149.1300       8.9        53       914        95
VIS    2025250    200200   18.9600  148.9500       9.8        51       987        92
VIS    2025250    200200   18.9500  148.8200       8.9        43       992        90
VIS    2025250    200200   18.9700  148.8000       8.8        42       989        95
VIS    2025250    200200   18.9500  148.6700       9.3        46       974        97
VIS    2025250    200200   18.9500  148.3700       8.1        46       876        95
VIS    2025250    200200   18.9600  148.3600       9.1        42       876        95
VIS    2025250    200200   18.9700  148.3400       8.9        56       876        93
VIS    2025250    200200   18.9600  148.2800       8.8        50       986        96
VIS    2025250    200200   18.9400  148.2600      11.2        37       978        94
VIS    2025250    200200   18.9500  148.2300      10.5        34       978        97
VIS    2025250    200200   18.9600  148.1900      11.6        37       972        99
VIS    2025250    200200   18.9600  148.1700      11.5        43       952        99
VIS    2025250    200200   18.9600  148.1600      11.4        43       952        99
VIS    2025250    200200   18.9400  148.1300      11.0        42       941        99
VIS    2025250    200200   18.9400  148.1000      11.0        42       934        99
VIS    2025250    200200   18.9600  148.0700      11.2        41       966        99
VIS    2025250    200200   18.9500  148.0500      11.3        42       963        98
VIS    2025250    200200   18.9600  148.0300      11.9        46       907        99
VIS    2025250    200200   18.9600  148.0100      11.9        46       907        99
VIS    2025250    200200   18.9600  147.9700      12.3        40       924        96
VIS    2025250    200200   18.9400  147.9400      11.8        42       917        97
VIS    2025250    200200   18.9500  147.9200      11.7        43       917        98
VIS    2025250    200200   18.9600  147.9100      12.1        42       921        99
VIS    2025250    200200   18.9500  147.8900      11.9        42       924        97
VIS    2025250    200200   18.9600  147.8600      12.0        40       949        99
VIS    2025250    200200   18.9600  147.8400      11.9        41       949        99
VIS    2025250    200200   18.9600  147.8000      12.2        43       893        97
VIS    2025250    200200   18.9600  147.7900      12.5        42       877        96
VIS    2025250    200200   18.9600  147.7500      12.5        40       874        95
VIS    2025250    200200   18.9400  147.7200      12.4        40       884        93
VIS    2025250    200200   18.9500  147.7000      12.6        42       880        94
VIS    2025250    200200   18.9400  147.6900      12.6        43       878        96
VIS    2025250    200200   18.9300  146.0900      10.8        92       192        96
VIS    2025250    200200   18.9400  146.0500      11.1        85       191        91
VIS    2025250    200200   18.9400  146.0400      10.9        84       191        91
VIS    2025250    200200   18.9200  146.0000      11.3        85       193        94
VIS    2025250    200200   18.9400  145.9800      11.6        84       193        94
VIS    2025250    200200   18.9400  145.9700      12.0        86       193        95
VIS    2025250    200200   18.9400  145.9300      12.6        87       191        94
VIS    2025250    200200   18.9400  145.9100      14.2        83       194        92
VIS    2025250    200200   18.9200  145.6600      12.3       118       169        94
VIS    2025250    200200   18.9400  145.5900      12.4       125       165        91
VIS    2025250    200200   18.9300  145.5500      14.0       132       162        97
VIS    2025250    200200   18.9200  145.5400      13.3       130       161        94
VIS    2025250    200200   18.9300  145.5300      13.9       131       161        94
VIS    2025250    200200   18.9200  145.4900      13.8       134       158        92
VIS    2025250    200200   18.9300  145.4600      13.2       134       157        94
VIS    2025250    200200   18.9300  145.4300      13.6       135       157        95
VIS    2025250    200200   18.9400  145.4200      14.0       137       157        96
VIS    2025250    200200   18.9200  145.4000      13.9       137       153        95
VIS    2025250    200200   18.9400  145.3800      14.1       141       152        95
VIS    2025250    200200   18.9200  145.3400      13.7       141       145        94
VIS    2025250    200200   18.9300  145.3200      13.6       144       144        96
VIS    2025250    200200   18.9200  145.2900      12.7       142       145        94
VIS    2025250    200200   18.9300  145.2800      13.5       145       146        95
VIS    2025250    200200   18.9200  145.2500      13.2       145       147        97
VIS    2025250    200200   18.9100  145.2100      13.5       146       151        96
VIS    2025250    200200   18.9200  145.2100      13.8       147       151        97
VIS    2025250    200200   18.9300  145.1800      14.6       149       148        99
VIS    2025250    200200   18.9200  145.1600      13.7       149       148        97
VIS    2025250    200200   18.9200  145.1300      12.3       149       149        95
VIS    2025250    200200   18.9100  145.0900      11.4       155       152        92
VIS    2025250    200200   18.9200  145.0800      12.3       155       155        95
VIS    2025250    200200   18.9100  145.0600      12.5       148       157        91
VIS    2025250    200200   18.9200  144.9800      15.0       154       160        97
VIS    2025250    200200   18.9300  144.9500      15.1       154       160        98
VIS    2025250    200200   18.9300  144.9200      15.1       157       161        97
VIS    2025250    200200   18.9300  144.9000      15.0       157       162        91
VIS    2025250    200200   18.9300  144.8600      15.2       139       163        97
VIS    2025250    200200   18.9300  144.8300      14.2       137       164        97
VIS    2025250    200200   18.9200  144.8000      14.5       144       165        98
VIS    2025250    200200   18.9200  144.3800      20.7       151       189        90
VIS    2025250    200200   18.9300  144.3500      19.9       157       187        90
VIS    2025250    200200   18.9100  144.2700      16.7       165       192        91
VIS    2025250    200200   18.9300  144.2500      17.6       160       193        93
VIS    2025250    200200   18.9400  149.4400       9.1        58       888        98
VIS    2025250    200200   18.9400  149.4100       9.6        52       933        91
VIS    2025250    200200   18.9500  149.4100       9.6        52       933        90
VIS    2025250    200200   18.9500  149.3200       8.5        41       985        93
VIS    2025250    200200   18.9500  149.2900       9.1        42       980        96
VIS    2025250    200200   18.9400  149.2700       8.6        40       965        98
VIS    2025250    200200   18.9400  149.2500       8.7        44       957        97
VIS    2025250    200200   18.9400  149.2200       9.6        49       957        96
VIS    2025250    200200   18.9500  149.2000       9.3        49       938        98
VIS    2025250    200200   18.9500  149.1700       8.8        50       906        99
VIS    2025250    200200   18.9300  149.1500       8.7        54       899        98
VIS    2025250    200200   18.9500  149.1300       9.0        57       898        93
VIS    2025250    200200   18.9300  149.0300       8.9        43       980        95
VIS    2025250    200200   18.9300  148.9600       9.1        50       983        95
VIS    2025250    200200   18.9300  148.8800       8.2        49       968        91
VIS    2025250    200200   18.9400  148.8100       8.6        46       992        90
VIS    2025250    200200   18.9400  148.7700       9.2        43       982        96
VIS    2025250    200200   18.9400  148.7600       8.9        44       982        97
VIS    2025250    200200   18.9400  148.6500       9.3        47       961        98
VIS    2025250    200200   18.9200  148.6300       9.4        46       961        99
VIS    2025250    200200   18.9200  148.6100      10.3        41       972        99
VIS    2025250    200200   18.9200  148.4200      10.0        41       980        94
VIS    2025250    200200   18.9300  148.3800       7.7        60       925        92
VIS    2025250    200200   18.9200  148.3500       8.2        61       872        97
VIS    2025250    200200   18.9300  148.3300       8.6        65       878        95
VIS    2025250    200200   18.9200  148.3200       9.0        63       897        95
VIS    2025250    200200   18.9300  148.2800       8.8        53       969        93
VIS    2025250    200200   18.9400  148.2600      10.7        38       978        98
VIS    2025250    200200   18.9400  148.2500      10.9        38       978        96
VIS    2025250    200200   18.9400  148.2200      10.3        39       978        97
VIS    2025250    200200   18.9200  148.1800      11.2        41       968       100
VIS    2025250    200200   18.9400  148.1600      11.4        42       966        99
VIS    2025250    200200   18.9300  148.1300      11.1        41       941        99
VIS    2025250    200200   18.9300  148.1100      11.0        41       934        99
VIS    2025250    200200   18.9200  148.0700      11.3        43       963        99
VIS    2025250    200200   18.9400  148.0500      11.3        43       963        96
VIS    2025250    200200   18.9400  147.9900      11.4        47       944        94
VIS    2025250    200200   18.9200  147.9600      10.8        41       946        98
VIS    2025250    200200   18.9200  147.9500      10.7        41       946        98
VIS    2025250    200200   18.9200  147.9100       9.7        46       897        95
VIS    2025250    200200   18.9200  147.9000      10.2        48       897        96
VIS    2025250    200200   18.9400  147.8600      11.9        40       960        98
VIS    2025250    200200   18.9300  147.8500      11.9        41       960        98
VIS    2025250    200200   18.9300  147.8100      11.8        41       921        97
VIS    2025250    200200   18.9100  147.7800      12.1        39       876        95
VIS    2025250    200200   18.9100  147.7600      12.3        39       877        95
VIS    2025250    200200   18.9100  147.7500      12.3        40       877        95
VIS    2025250    200200   18.9100  147.7200      12.2        41       891        94
VIS    2025250    200200   18.9300  147.6900      12.7        43       878        96
VIS    2025250    200200   18.9200  146.1000      10.8        92       192        96
VIS    2025250    200200   18.9000  146.0700      10.7        88       191        91
VIS    2025250    200200   18.9000  145.9900      11.1        86       193        95
VIS    2025250    200200   18.9000  145.9700      11.2        88       193        96
VIS    2025250    200200   18.9000  145.9400      12.3        87       192        95
VIS    2025250    200200   18.8900  145.6900      12.9       131       169        93
VIS    2025250    200200   18.9000  145.6000      10.4       123       165        91
VIS    2025250    200200   18.8900  145.5800      11.3       123       163        92
VIS    2025250    200200   18.9100  145.5400      12.6       128       162        95
VIS    2025250    200200   18.9100  145.5400      12.8       129       161        94
VIS    2025250    200200   18.9000  145.5100      13.3       131       158        92
VIS    2025250    200200   18.8900  145.4800      13.8       134       156        92
VIS    2025250    200200   18.9000  145.4500      13.8       134       153        94
VIS    2025250    200200   18.9100  145.4400      13.5       134       153        94
VIS    2025250    200200   18.9000  145.4100      13.9       135       152        95
VIS    2025250    200200   18.8900  145.3700      12.8       137       148        93
VIS    2025250    200200   18.9100  145.3500      13.4       140       147        94
VIS    2025250    200200   18.8900  145.3200      13.4       140       144        96
VIS    2025250    200200   18.8900  145.3100      13.3       142       144        96
VIS    2025250    200200   18.8900  145.2700      12.9       144       145        95
VIS    2025250    200200   18.8900  145.2600      12.5       144       147        94
VIS    2025250    200200   18.9000  145.2400      13.0       146       148        96
VIS    2025250    200200   18.8900  145.2200      12.2       145       150        94
VIS    2025250    200200   18.8900  145.1800      11.9       145       146        94
VIS    2025250    200200   18.9100  145.1700      13.2       148       146        97
VIS    2025250    200200   18.9100  145.1300      11.8       147       144        95
VIS    2025250    200200   18.9000  145.1200      11.4       148       151        93
VIS    2025250    200200   18.9100  145.0900      11.0       154       152        91
VIS    2025250    200200   18.8900  145.0700      10.9       149       154        93
VIS    2025250    200200   18.9000  144.8300      10.9       140       163        91
VIS    2025250    200200   18.8900  144.8100      11.9       142       164        93
VIS    2025250    200200   18.9000  144.8000      12.8       142       164        96
VIS    2025250    200200   18.8900  144.7800      12.7       144       165        95
VIS    2025250    200200   18.8900  144.6700      12.1       144       172        92
VIS    2025250    200200   18.9000  144.4800      16.8       147       182        95
VIS    2025250    200200   18.8800  144.4600      17.8       147       186        92
VIS    2025250    200200   18.8900  144.3700      20.5       150       188        90
VIS    2025250    200200   18.8900  144.3600      20.5       150       188        90
VIS    2025250    200200   18.9000  144.2800      17.2       163       190        92
VIS    2025250    200200   18.8900  144.2500      17.7       161       192        93
VIS    2025250    200200   18.8900  142.8500      15.5       135       767        96
VIS    2025250    200200   18.9100  149.5500       8.3        50       943        91
VIS    2025250    200200   18.9100  149.4800       8.5        57       852        91
VIS    2025250    200200   18.9200  149.3100       9.9        46       973        92
VIS    2025250    200200   18.9200  149.2900       8.8        42       965        95
VIS    2025250    200200   18.9200  149.2600       8.5        40       965        97
VIS    2025250    200200   18.9200  149.2400       8.5        40       965        97
VIS    2025250    200200   18.9100  149.2300       9.2        45       965        94
VIS    2025250    200200   18.9300  149.1900       9.6        50       941        97
VIS    2025250    200200   18.9200  149.1700       8.6        47       922        99
VIS    2025250    200200   18.9300  149.1500       8.7        53       899        98
VIS    2025250    200200   18.9100  149.1300       9.3        57       896        99
VIS    2025250    200200   18.9000  149.0200       8.6        34       982       100
VIS    2025250    200200   18.9200  148.9600       9.0        48       983        96
VIS    2025250    200200   18.9000  148.9300       9.0        56       953        91
VIS    2025250    200200   18.9200  148.8900       8.3        52       955        93
VIS    2025250    200200   18.9200  148.8800       8.2        51       960        94
VIS    2025250    200200   18.9200  148.8400       7.1        44       983        93
VIS    2025250    200200   18.9200  148.7600       9.5        42       986        96
VIS    2025250    200200   18.9000  148.6500       9.0        47       934        99
VIS    2025250    200200   18.9200  148.6300       9.4        46       952        99
VIS    2025250    200200   18.9200  148.4200       9.9        42       980        95
VIS    2025250    200200   18.9000  148.3900       8.7        49       968        94
VIS    2025250    200200   18.9100  148.3800       8.3        53       917        93
VIS    2025250    200200   18.9100  148.3600       8.7        56       876        95
VIS    2025250    200200   18.9100  148.3300       9.4        61       878        98
VIS    2025250    200200   18.9100  148.3100       9.7        63       897        96
VIS    2025250    200200   18.9100  148.2800       9.4        46       969        97
VIS    2025250    200200   18.9000  148.2400      10.4        50       936        98
VIS    2025250    200200   18.8900  148.2200      10.6        51       926        96
VIS    2025250    200200   18.9100  148.1900      11.2        40       966       100
VIS    2025250    200200   18.9000  148.1700      11.6        38       963       100
VIS    2025250    200200   18.8900  148.1500      11.8        39       952       100
VIS    2025250    200200   18.9000  148.1200      11.3        43       922        99
VIS    2025250    200200   18.9100  148.0600      11.5        42       963        99
VIS    2025250    200200   18.9100  148.0200      11.7        45       966        99
VIS    2025250    200200   18.9000  148.0000      11.2        45       966        99
VIS    2025250    200200   18.8900  147.9600      10.7        42       969       100
VIS    2025250    200200   18.9100  147.9500      10.5        40       946        99
VIS    2025250    200200   18.9100  147.9100       9.4        45       900        94
VIS    2025250    200200   18.9100  147.9100       9.4        46       890        95
VIS    2025250    200200   18.9000  147.8700      10.4        45       897        98
VIS    2025250    200200   18.9100  147.8400      12.2        43       960        99
VIS    2025250    200200   18.9100  147.8400      12.3        44       957        99
VIS    2025250    200200   18.8900  147.8100      12.7        43       890        97
VIS    2025250    200200   18.9100  147.7700      12.1        39       872        95
VIS    2025250    200200   18.9000  147.7600      12.1        39       872        95
VIS    2025250    200200   18.9100  147.7200      12.3        41       893        94
VIS    2025250    200200   18.9100  147.7100      12.3        41       893        95
VIS    2025250    200200   18.8700  146.1000      10.5        85       192        94
VIS    2025250    200200   18.8900  146.0800      10.1        89       191        92
VIS    2025250    200200   18.8900  146.0600      11.2        86       192        93
VIS    2025250    200200   18.8900  145.9700      11.1        94       193        98
VIS    2025250    200200   18.8700  145.9600      10.5       106       191        98
VIS    2025250    200200   18.8900  145.9400      11.9        91       192        97
VIS    2025250    200200   18.8800  145.8100      13.8       123       188        93
VIS    2025250    200200   18.8800  145.6900      13.2       131       169        90
VIS    2025250    200200   18.8800  145.6000      11.8       125       162        92
VIS    2025250    200200   18.8700  145.6000      12.3       124       161        92
VIS    2025250    200200   18.8900  145.5600      12.3       125       161        94
VIS    2025250    200200   18.8800  145.5300      12.7       131       158        93
VIS    2025250    200200   18.8800  145.5100      13.2       132       158        92
VIS    2025250    200200   18.8800  145.4800      14.0       134       156        94
VIS    2025250    200200   18.8700  145.4600      14.2       132       154        95
VIS    2025250    200200   18.8900  145.4400      14.0       134       152        95
VIS    2025250    200200   18.8800  145.4200      13.9       133       152        94
VIS    2025250    200200   18.8800  145.4000      13.2       134       151        93
VIS    2025250    200200   18.8700  145.3600      12.8       134       151        93
VIS    2025250    200200   18.8800  145.3300      13.0       138       148        94
VIS    2025250    200200   18.8900  145.3100      13.2       141       144        96
VIS    2025250    200200   18.8800  145.3000      12.8       141       143        96
VIS    2025250    200200   18.8800  145.2700      12.2       143       145        94
VIS    2025250    200200   18.8800  145.2400      11.6       142       148        92
VIS    2025250    200200   18.8800  145.2300      11.4       143       148        91
VIS    2025250    200200   18.8700  145.2000      11.0       142       151        91
VIS    2025250    200200   18.8800  145.1800      11.1       143       148        91
VIS    2025250    200200   18.8600  145.1200      11.9       143       152        93
VIS    2025250    200200   18.8800  145.0700      11.5       144       157        93
VIS    2025250    200200   18.8700  145.0500      13.4       136       162        93
VIS    2025250    200200   18.8800  145.0200      12.7       128       162        93
VIS    2025250    200200   18.8600  144.8900      12.8       142       175        96
VIS    2025250    200200   18.8600  144.8900      12.8       142       175        96
VIS    2025250    200200   18.8800  144.7900      12.7       142       165        96
VIS    2025250    200200   18.8600  144.7200      11.1       158       168        91
VIS    2025250    200200   18.8600  144.7100      10.6       157       170        94
VIS    2025250    200200   18.8700  144.6800      10.6       150       172        94
VIS    2025250    200200   18.8700  144.6400      12.1       164       178        97
VIS    2025250    200200   18.8800  144.3900      20.3       150       189        90
VIS    2025250    200200   18.8600  144.2800      18.4       149       191        94
VIS    2025250    200200   18.8800  144.2600      17.7       159       192        92
VIS    2025250    200200   18.8500  142.8300      16.1       129       782        96
VIS    2025250    200200   18.8600  142.8200      16.3       130       771        96
VIS    2025250    200200   18.9000  149.5700       8.3        35       980        90
VIS    2025250    200200   18.8900  149.4800       8.5        52       881        92
VIS    2025250    200200   18.9000  149.4500       8.7        56       852        91
VIS    2025250    200200   18.9000  149.3100       9.7        46       973        90
VIS    2025250    200200   18.9000  149.2800       8.6        38       960        96
VIS    2025250    200200   18.8900  149.2700       8.6        39       960        95
VIS    2025250    200200   18.9000  149.2300       8.8        43       966        96
VIS    2025250    200200   18.8800  149.2200       9.6        53       966        90
VIS    2025250    200200   18.8800  149.2000       9.3        54       945        94
VIS    2025250    200200   18.8800  149.1600       8.5        46       913        99
VIS    2025250    200200   18.9000  149.1400       8.9        49       899        99
VIS    2025250    200200   18.9000  149.1300       9.2        56       895        99
VIS    2025250    200200   18.9000  149.0800       8.8        57       904       100
VIS    2025250    200200   18.8900  148.9400       9.2        55       961        90
VIS    2025250    200200   18.8900  148.9200       9.6        66       922        94
VIS    2025250    200200   18.8800  148.8900       8.9        62       922        96
VIS    2025250    200200   18.8800  148.8600       7.9        45       939        99
VIS    2025250    200200   18.8800  148.6700       9.4        45       934       100
VIS    2025250    200200   18.8900  148.6400       9.3        44       931       100
VIS    2025250    200200   18.8800  148.6300       9.8        40       931        99
VIS    2025250    200200   18.8700  148.5900      10.4        41       972        98
VIS    2025250    200200   18.8800  148.4100       9.2        45       968        96
VIS    2025250    200200   18.8700  148.3800       8.5        53       894        97
VIS    2025250    200200   18.8900  148.3500       8.8        60       878        96
VIS    2025250    200200   18.8900  148.2900      10.5        50       940        91
VIS    2025250    200200   18.8900  148.2500      10.1        50       943        98
VIS    2025250    200200   18.8900  148.2400      10.2        52       926        99
VIS    2025250    200200   18.8700  148.2200      10.6        53       926        95
VIS    2025250    200200   18.8700  148.1700      11.4        37       952        99
VIS    2025250    200200   18.8900  148.1500      11.9        38       952        99
VIS    2025250    200200   18.8700  148.1300      11.4        41       907        98
VIS    2025250    200200   18.8700  148.1200      11.7        42       907        98
VIS    2025250    200200   18.8900  148.0400      11.7        43       972        99
VIS    2025250    200200   18.8900  148.0000      11.6        43       967       100
VIS    2025250    200200   18.8800  147.9800      11.1        43       969       100
VIS    2025250    200200   18.8700  147.9500      10.9        40       946        99
VIS    2025250    200200   18.8700  147.9300      10.4        40       904        95
VIS    2025250    200200   18.8700  147.9200      10.2        40       904        95
VIS    2025250    200200   18.8900  147.8900       9.6        46       824        95
VIS    2025250    200200   18.8700  147.8600      11.8        40       921        98
VIS    2025250    200200   18.8700  147.8300      12.4        43       924        99
VIS    2025250    200200   18.8900  147.8100      12.7        43       887        96
VIS    2025250    200200   18.8900  147.7900      12.2        41       879        95
VIS    2025250    200200   18.8600  147.7500      11.9        39       863        94
VIS    2025250    200200   18.8700  147.7400      12.2        40       868        95
VIS    2025250    200200   18.8700  146.1100      10.4        82       194        93
VIS    2025250    200200   18.8500  146.0800      11.2        87       194        96
VIS    2025250    200200   18.8500  146.0600      11.6        90       194        97
VIS    2025250    200200   18.8600  146.0500      11.9        90       196        97
VIS    2025250    200200   18.8500  145.9900      11.5        88       195        96
VIS    2025250    200200   18.8600  145.9600      10.9       106       191        98
VIS    2025250    200200   18.8600  145.9500      11.0       110       190        97
VIS    2025250    200200   18.8600  145.8500      11.5       123       189        91
VIS    2025250    200200   18.8500  145.8300      12.8       128       188        92
VIS    2025250    200200   18.8400  145.6500      11.9       123       164        94
VIS    2025250    200200   18.8600  145.6200      12.4       123       163        94
VIS    2025250    200200   18.8600  145.5900      12.8       125       161        93
VIS    2025250    200200   18.8600  145.5800      12.9       126       160        93
VIS    2025250    200200   18.8500  145.5500      12.6       128       158        92
VIS    2025250    200200   18.8500  145.5400      12.3       129       158        92
VIS    2025250    200200   18.8500  145.5100      13.1       132       156        94
VIS    2025250    200200   18.8500  145.4700      14.3       132       153        95
VIS    2025250    200200   18.8600  145.4600      14.2       132       153        95
VIS    2025250    200200   18.8600  145.4200      13.6       131       151        93
VIS    2025250    200200   18.8500  145.4100      13.5       131       151        93
VIS    2025250    200200   18.8500  145.3700      12.7       133       151        93
VIS    2025250    200200   18.8600  145.3600      12.8       134       151        93
VIS    2025250    200200   18.8500  145.3300      11.9       134       136        95
VIS    2025250    200200   18.8500  145.3000      11.6       137       136        95
VIS    2025250    200200   18.8600  145.2700      11.7       140       141        94
VIS    2025250    200200   18.8600  145.2600      11.6       140       141        93
VIS    2025250    200200   18.8500  145.2200      11.6       141       148        93
VIS    2025250    200200   18.8500  145.2100      11.5       141       148        93
VIS    2025250    200200   18.8600  145.1800      10.9       140       152        90
VIS    2025250    200200   18.8600  145.1200      12.1       141       152        92
VIS    2025250    200200   18.8600  145.0700      15.1       142       162        93
VIS    2025250    200200   18.8400  145.0300      13.9       141       164        95
VIS    2025250    200200   18.8400  145.0000      14.0       145       164        95
VIS    2025250    200200   18.8500  144.9400      13.3       139       167        91
VIS    2025250    200200   18.8400  144.9200      13.5       142       167        97
VIS    2025250    200200   18.8600  144.8800      12.7       143       175        96
VIS    2025250    200200   18.8600  144.7700      12.2       148       169        96
VIS    2025250    200200   18.8400  144.7200      11.3       162       172        92
VIS    2025250    200200   18.8600  144.7000      10.4       160       172        95
VIS    2025250    200200   18.8500  144.6700      10.1       158       173        92
VIS    2025250    200200   18.8400  144.6500      12.8       155       178        99
VIS    2025250    200200   18.8500  144.3700      18.9       149       189        92
VIS    2025250    200200   18.8500  144.3200      17.7       148       189        92
VIS    2025250    200200   18.8500  144.2700      18.0       151       191        95
VIS    2025250    200200   18.8500  144.2600      17.3       154       191        96
VIS    2025250    200200   18.8800  149.6600       7.7         6       974        90
VIS    2025250    200200   18.8600  149.5300       8.2        41       953        94
VIS    2025250    200200   18.8600  149.5100       8.1        47       948        97
VIS    2025250    200200   18.8800  149.5000       8.4        53       913        96
VIS    2025250    200200   18.8800  149.4700       8.5        53       881        93
VIS    2025250    200200   18.8600  149.4400       8.4        39       941        98
VIS    2025250    200200   18.8600  149.2800       9.0        49       980        93
VIS    2025250    200200   18.8600  149.2400       9.3        48       980        96
VIS    2025250    200200   18.8600  149.2100       8.8        49       959        97
VIS    2025250    200200   18.8800  149.1900       8.9        52       941        96
VIS    2025250    200200   18.8600  149.1600       8.5        46       913        98
VIS    2025250    200200   18.8600  149.1400       8.2        41       909        97
VIS    2025250    200200   18.8600  149.1300       8.2        40       909        97
VIS    2025250    200200   18.8700  149.1000       8.4        53       913        96
VIS    2025250    200200   18.8600  148.9100       9.8        66       932        92
VIS    2025250    200200   18.8600  148.9100       9.7        65       932        93
VIS    2025250    200200   18.8600  148.8600       8.0        44       940        99
VIS    2025250    200200   18.8600  148.8300       8.0        40       971        97
VIS    2025250    200200   18.8700  148.6700       9.4        44       934       100
VIS    2025250    200200   18.8500  148.6500       9.0        44       922        98
VIS    2025250    200200   18.8600  148.6200       9.4        39       920        98
VIS    2025250    200200   18.8600  148.6100       9.5        41       922        99
VIS    2025250    200200   18.8700  148.5900      10.1        43       962        98
VIS    2025250    200200   18.8600  148.5300      10.3        34       995        90
VIS    2025250    200200   18.8600  148.4100       8.0        38       955        98
VIS    2025250    200200   18.8500  148.4000       7.6        46       952        96
VIS    2025250    200200   18.8500  148.2800      11.2        30       992        98
VIS    2025250    200200   18.8700  148.2600       9.1        48       947        98
VIS    2025250    200200   18.8700  148.2500       9.5        49       947        98
VIS    2025250    200200   18.8500  148.2200       9.9        55       947        93
VIS    2025250    200200   18.8600  148.2000      10.6        46       949        99
VIS    2025250    200200   18.8500  148.1600      11.4        32       949        98
VIS    2025250    200200   18.8400  148.1300      11.2        36       897        94
VIS    2025250    200200   18.8400  148.1100      11.5        38       897        96
VIS    2025250    200200   18.8500  148.0800      13.0        39       926        97
VIS    2025250    200200   18.8400  148.0800      13.0        40       946        98
VIS    2025250    200200   18.8400  147.9900      11.5        39       966       100
VIS    2025250    200200   18.8400  147.9600      11.2        40       924        98
VIS    2025250    200200   18.8600  147.9400      10.7        41       907        97
VIS    2025250    200200   18.8600  147.9300      10.5        40       904        95
VIS    2025250    200200   18.8500  147.8600      12.0        37       921        97
VIS    2025250    200200   18.8600  147.8300      12.2        42       921        98
VIS    2025250    200200   18.8400  147.7900      11.9        39       865        94
VIS    2025250    200200   18.8600  147.7800      12.1        39       868        94
VIS    2025250    200200   18.8600  147.7400      12.3        40       858        95
VIS    2025250    200200   18.8400  146.0900      11.3        83       194        94
VIS    2025250    200200   18.8200  146.0800      11.8        83       194        95
VIS    2025250    200200   18.8200  146.0400      11.7        88       192        96
VIS    2025250    200200   18.8300  146.0200      11.0        88       196        95
VIS    2025250    200200   18.8200  145.9900      10.4        88       194        90
VIS    2025250    200200   18.8400  145.9800      11.4        92       196        98
VIS    2025250    200200   18.8400  145.9500      11.2       113       189        93
VIS    2025250    200200   18.8200  145.7500      11.3       125       173        95
VIS    2025250    200200   18.8400  145.7400      12.2       130       173        94
VIS    2025250    200200   18.8300  145.7000      11.7       129       168        93
VIS    2025250    200200   18.8300  145.6800      11.5       126       164        92
VIS    2025250    200200   18.8200  145.6500      11.5       121       164        92
VIS    2025250    200200   18.8200  145.6300      12.7       123       163        90
VIS    2025250    200200   18.8200  145.6100      13.3       125       161        91
VIS    2025250    200200   18.8400  145.5900      13.8       128       160        96
VIS    2025250    200200   18.8300  145.5500      12.5       128       157        92
VIS    2025250    200200   18.8300  145.5400      12.3       128       157        91
VIS    2025250    200200   18.8200  145.5200      13.0       130       155        93
VIS    2025250    200200   18.8200  145.4900      13.4       131       155        94
VIS    2025250    200200   18.8400  145.4600      13.9       130       152        93
VIS    2025250    200200   18.8200  145.4500      13.0       126       150        91
VIS    2025250    200200   18.8300  145.4100      12.6       130       149        92
VIS    2025250    200200   18.8300  145.3800      12.0       131       142        93
VIS    2025250    200200   18.8300  145.3500      11.5       130       141        92
VIS    2025250    200200   18.8300  145.3400      11.2       130       140        91
VIS    2025250    200200   18.8300  145.3100      11.0       132       134        93
VIS    2025250    200200   18.8400  145.2600      11.7       139       148        92
VIS    2025250    200200   18.8200  145.2400      12.3       139       154        94
VIS    2025250    200200   18.8400  145.2200      11.9       140       153        94
VIS    2025250    200200   18.8400  145.1800      11.7       141       157        92
VIS    2025250    200200   18.8200  145.0500      17.4       144       164        91
VIS    2025250    200200   18.8300  145.0100      14.4       147       164        99
VIS    2025250    200200   18.8200  145.0000      13.8       148       165        98
VIS    2025250    200200   18.8300  144.9100      13.1       142       167        97
VIS    2025250    200200   18.8300  144.9000      12.4       143       175        91
VIS    2025250    200200   18.8100  144.8100      13.7       163       177        91
VIS    2025250    200200   18.8300  144.7300      12.6       167       172        92
VIS    2025250    200200   18.8300  144.7100      12.9       166       172        95
VIS    2025250    200200   18.8300  144.6900      11.2       162       172        93
VIS    2025250    200200   18.8300  144.6500      13.9       154       182        99
VIS    2025250    200200   18.8200  144.6400      15.2       149       183        99
VIS    2025250    200200   18.8100  144.6100      11.8       151       182        92
VIS    2025250    200200   18.8300  144.3000      19.6       152       188        92
VIS    2025250    200200   18.8500  149.5300       8.0        44       953        94
VIS    2025250    200200   18.8400  149.4500       8.3        38       926        97
VIS    2025250    200200   18.8500  149.2800       9.2        49       980        93
VIS    2025250    200200   18.8500  149.2600       9.5        49       980        92
VIS    2025250    200200   18.8300  149.2200       8.7        46       976        97
VIS    2025250    200200   18.8300  149.1900       8.4        51       959        92
VIS    2025250    200200   18.8500  149.1900       8.6        53       933        97
VIS    2025250    200200   18.8500  149.1600       8.5        49       913        96
VIS    2025250    200200   18.8500  149.1300       8.0        39       910        96
VIS    2025250    200200   18.8300  149.1100       8.0        43       928        96
VIS    2025250    200200   18.8300  149.0900       8.3        52       913        93
VIS    2025250    200200   18.8500  149.0500       8.4        45       930        92
VIS    2025250    200200   18.8400  149.0400       8.4        45       930        93
VIS    2025250    200200   18.8400  148.9000       9.1        60       940        94
VIS    2025250    200200   18.8400  148.8900       8.9        58       941        95
VIS    2025250    200200   18.8400  148.8600       8.2        43       946        98
VIS    2025250    200200   18.8500  148.6600       8.7        45       929        99
VIS    2025250    200200   18.8500  148.6400       8.9        44       920        98
VIS    2025250    200200   18.8400  148.6200       9.3        41       905        96
VIS    2025250    200200   18.8300  148.5900      10.0        47       907        98
VIS    2025250    200200   18.8300  148.3800       8.2        58       955        94
VIS    2025250    200200   18.8200  148.2600      10.4        38       982        98
VIS    2025250    200200   18.8300  148.2400      10.0        51       964        92
VIS    2025250    200200   18.8300  148.1800      10.8        32       952        97
VIS    2025250    200200   18.8300  148.1700      11.0        31       952        97
VIS    2025250    200200   18.8400  148.1300      11.1        37       897        95
VIS    2025250    200200   18.8400  148.1200      11.2        38       897        96
VIS    2025250    200200   18.8200  148.0800      12.5        42       946        99
VIS    2025250    200200   18.8200  148.0300      10.8        39       972        99
VIS    2025250    200200   18.8200  148.0100      11.1        32       966        97
VIS    2025250    200200   18.8400  147.9800      11.1        40       964       100
VIS    2025250    200200   18.8200  147.9600      11.0        38       924        98
VIS    2025250    200200   18.8300  147.9300      10.8        39       883        92
VIS    2025250    200200   18.8300  147.8400      11.6        34       907        93
VIS    2025250    200200   18.8200  147.8200      11.3        36       897        95
VIS    2025250    200200   18.8400  147.7800      11.8        39       854        93
VIS    2025250    200200   18.8300  147.7700      11.9        39       854        92
VIS    2025250    200200   18.8100  146.0900      12.7        80       196        93
VIS    2025250    200200   18.8100  146.0600      12.3        86       194        95
VIS    2025250    200200   18.8200  146.0500      11.8        88       192        96
VIS    2025250    200200   18.8000  146.0100      10.4        89       192        94
VIS    2025250    200200   18.8200  145.9900      10.5        88       194        91
VIS    2025250    200200   18.8000  145.9800      10.5        97       193        96
VIS    2025250    200200   18.8100  145.9400      11.5       111       191        94
VIS    2025250    200200   18.8000  145.8000      14.5        86       183        91
VIS    2025250    200200   18.8100  145.7400      10.7       124       172        93
VIS    2025250    200200   18.8100  145.7200      11.5       127       165        94
VIS    2025250    200200   18.8000  145.6900      10.6       121       164        92
VIS    2025250    200200   18.8100  145.6800      11.1       124       164        93
VIS    2025250    200200   18.8100  145.6400      11.8       121       163        92
VIS    2025250    200200   18.8000  145.6400      12.1       121       163        93
VIS    2025250    200200   18.8100  145.6100      13.1       125       161        91
VIS    2025250    200200   18.8100  145.5700      12.7       124       157        92
VIS    2025250    200200   18.7900  145.5200      13.1       126       154        93
VIS    2025250    200200   18.8000  145.4900      13.2       127       154        92
VIS    2025250    200200   18.7900  145.4700      13.0       124       151        91
VIS    2025250    200200   18.8000  145.4500      12.1       123       150        90
VIS    2025250    200200   18.7900  145.4000      10.5       126       142        90
VIS    2025250    200200   18.7900  145.3900      10.5       126       142        90
VIS    2025250    200200   18.8100  145.3700      10.7       128       142        91
VIS    2025250    200200   18.8000  145.2200      12.0       137       159        94
VIS    2025250    200200   18.8000  145.2200      12.1       137       159        94
VIS    2025250    200200   18.7900  144.8900      12.3       140       175        96
VIS    2025250    200200   18.7900  144.8700      12.5       142       177        95
VIS    2025250    200200   18.8100  144.8100      13.5       162       177        91
VIS    2025250    200200   18.8100  144.7900      15.1       162       177        90
VIS    2025250    200200   18.7900  144.7800      14.2       155       177        94
VIS    2025250    200200   18.8100  144.7100      15.6       169       177        96
VIS    2025250    200200   18.8000  144.7100      15.6       171       177        96
VIS    2025250    200200   18.8000  144.6500      17.2       146       183        93
VIS    2025250    200200   18.8000  144.6300      15.7       145       183        96
VIS    2025250    200200   18.7900  144.5900      11.0       150       182        94
VIS    2025250    200200   18.8200  149.5600       9.4        11       985        91
VIS    2025250    200200   18.8300  149.5100       8.2        53       948        93
VIS    2025250    200200   18.8200  149.2800       9.1        53       970        92
VIS    2025250    200200   18.8200  149.2600       9.3        51       980        92
VIS    2025250    200200   18.8100  149.2500       9.0        49       976        94
VIS    2025250    200200   18.8200  149.2100       8.4        49       976        95
VIS    2025250    200200   18.8300  149.1900       8.3        51       949        93
VIS    2025250    200200   18.8200  149.1600       8.5        47       932        97
VIS    2025250    200200   18.8300  149.1500       8.5        44       918        97
VIS    2025250    200200   18.8200  149.1100       8.4        42       928        97
VIS    2025250    200200   18.8200  149.0900       8.4        48       914        94
VIS    2025250    200200   18.8200  149.0700       8.7        53       912        95
VIS    2025250    200200   18.8300  149.0400       8.5        46       930        95
VIS    2025250    200200   18.8100  149.0200       8.3        40       939        92
VIS    2025250    200200   18.8100  148.8700       8.6        38       985        99
VIS    2025250    200200   18.8100  148.7800       8.8        44       997        97
VIS    2025250    200200   18.8000  148.7600       8.3        42       971        98
VIS    2025250    200200   18.8200  148.6700       8.1        42       980        96
VIS    2025250    200200   18.8100  148.6300       8.9        44       912        95
VIS    2025250    200200   18.8200  148.6100       9.6        44       891        94
VIS    2025250    200200   18.8200  148.5900      10.1        48       901        97
VIS    2025250    200200   18.8200  148.4200       8.5        63       955        92
VIS    2025250    200200   18.8100  148.4000       8.5        59       967        90
VIS    2025250    200200   18.8100  148.2700      11.2        33       992        97
VIS    2025250    200200   18.8200  148.2500       9.9        45       974        95
VIS    2025250    200200   18.8000  148.2100      10.5        52       974        93
VIS    2025250    200200   18.8100  148.1800      10.5        39       952        98
VIS    2025250    200200   18.8000  148.1600      11.1        36       922        96
VIS    2025250    200200   18.7900  148.1400      11.5        38       897        96
VIS    2025250    200200   18.8000  148.1200      11.3        41       897        96
VIS    2025250    200200   18.8000  148.0900      11.8        44       919        98
VIS    2025250    200200   18.8100  148.0400      11.1        40       972        98
VIS    2025250    200200   18.8100  148.0100      11.3        30       960        94
VIS    2025250    200200   18.8100  148.0000      11.4        30       964        95
VIS    2025250    200200   18.8000  147.9600      10.8        37       941        98
VIS    2025250    200200   18.7900  147.9500      10.8        37       931        97
VIS    2025250    200200   18.7900  147.8400      12.1        38       881        94
VIS    2025250    200200   18.8100  147.8200      11.4        37       886        95
VIS    2025250    200200   18.7900  146.0700      13.1        82       196        94
VIS    2025250    200200   18.7900  146.0400      12.6        86       192        94
VIS    2025250    200200   18.7800  146.0300      11.2        83       191        91
VIS    2025250    200200   18.7900  145.9700      11.1        99       191        98
VIS    2025250    200200   18.7800  145.9600      11.9       100       191       100
VIS    2025250    200200   18.7700  145.9300      12.1        93       190        97
VIS    2025250    200200   18.7700  145.8800      17.4        90       189        90
VIS    2025250    200200   18.7800  145.6900      10.4       118       164        91
VIS    2025250    200200   18.7900  145.6900      10.3       120       164        91
VIS    2025250    200200   18.7900  145.5200      13.2       125       154        92
VIS    2025250    200200   18.7800  145.5100      13.3       124       152        91
VIS    2025250    200200   18.7700  145.4900      13.0       124       150        91
VIS    2025250    200200   18.7800  145.4600      12.2       121       148        90
VIS    2025250    200200   18.7800  145.2600      10.3       128       156        90
VIS    2025250    200200   18.7800  145.2500      10.9       132       156        91
VIS    2025250    200200   18.7700  145.2100      13.2       138       160        96
VIS    2025250    200200   18.7700  145.1800      12.7       151       160        90
VIS    2025250    200200   18.7600  144.9100      12.4       139       173        96
VIS    2025250    200200   18.7700  144.8800      12.8       144       176        94
VIS    2025250    200200   18.7600  144.8500      12.7       155       182        90
VIS    2025250    200200   18.7700  144.8200      13.0       153       180        91
VIS    2025250    200200   18.7600  144.7900      12.5       149       180        90
VIS    2025250    200200   18.7600  144.7800      12.6       146       180        93
VIS    2025250    200200   18.7600  144.7100      15.4       177       178        91
VIS    2025250    200200   18.7700  144.6800      14.4       172       182        93
VIS    2025250    200200   18.7600  144.6600      13.5       170       180        96
VIS    2025250    200200   18.7700  144.6300      12.5       156       182        99
VIS    2025250    200200   18.8000  149.5600       9.2        12       985        92
VIS    2025250    200200   18.7900  149.5400       8.3        34       978        95
VIS    2025250    200200   18.8000  149.3000       7.8        42       995        98
VIS    2025250    200200   18.7900  149.2800       8.4        46       976        96
VIS    2025250    200200   18.7800  149.2500       9.1        46       983        94
VIS    2025250    200200   18.7900  149.1900       8.8        49       971        94
VIS    2025250    200200   18.7800  149.1900       8.9        48       969        94
VIS    2025250    200200   18.7800  149.1600       8.6        44       955        98
VIS    2025250    200200   18.7800  149.1400       8.7        41       943       100
VIS    2025250    200200   18.7800  149.1000       8.9        49       906        97
VIS    2025250    200200   18.7800  149.0700       8.9        49       905        99
VIS    2025250    200200   18.8000  149.0500       8.7        50       899        96
VIS    2025250    200200   18.7800  149.0300       8.7        45       914        98
VIS    2025250    200200   18.8000  148.8600       9.2        34       987        97
VIS    2025250    200200   18.7900  148.8100       9.7        43       987        94
VIS    2025250    200200   18.7800  148.7900       9.5        45       954        98
VIS    2025250    200200   18.8000  148.7600       8.5        42       951        99
VIS    2025250    200200   18.7900  148.7600       8.9        44       954        99
VIS    2025250    200200   18.7800  148.7300       8.6        45       992        98
VIS    2025250    200200   18.8000  148.6400       8.4        44       970        94
VIS    2025250    200200   18.7800  148.6100       8.1        61       912        91
VIS    2025250    200200   18.7800  148.6100       8.1        60       905        91
VIS    2025250    200200   18.8000  148.5800       9.8        48       901        95
VIS    2025250    200200   18.7800  148.3900       8.4        53       969        93
VIS    2025250    200200   18.7800  148.3800       8.5        52       969        94
VIS    2025250    200200   18.7800  148.3400       8.8        60       946        93
VIS    2025250    200200   18.7800  148.3300       8.8        61       943        92
VIS    2025250    200200   18.7700  148.2300       9.7        64       974        92
VIS    2025250    200200   18.7700  148.2100      10.0        56       970        95
VIS    2025250    200200   18.7800  148.1700      11.3        38       934        98
VIS    2025250    200200   18.7900  148.1500      11.3        37       898        95
VIS    2025250    200200   18.7900  148.1200      11.8        41       897        97
VIS    2025250    200200   18.7900  148.1100      11.8        42       909        98
VIS    2025250    200200   18.7800  148.0700      11.3        42       952        99
VIS    2025250    200200   18.7700  148.0600      10.9        42       963       100
VIS    2025250    200200   18.7700  148.0200      11.4        33       959        98
VIS    2025250    200200   18.7900  147.9900      11.4        32       960        98
VIS    2025250    200200   18.7700  147.9700      11.4        33       942        97
VIS    2025250    200200   18.7700  147.9400      11.1        36       939        95
VIS    2025250    200200   18.7700  147.9400      10.8        37       934        94
VIS    2025250    200200   18.7900  147.8500      12.4        39       868        93
VIS    2025250    200200   18.7900  147.8300      12.1        39       877        95
VIS    2025250    200200   18.7500  145.9700      12.0       116       186        94
VIS    2025250    200200   18.7600  145.9700      11.8       112       187        97
VIS    2025250    200200   18.7600  145.9200      12.8        91       189        91
VIS    2025250    200200   18.7500  145.7200      11.1       117       162        90
VIS    2025250    200200   18.7500  145.5400      13.2       123       154        92
VIS    2025250    200200   18.7600  145.5100      13.3       123       152        91
VIS    2025250    200200   18.7600  145.2500      10.4       129       157        90
VIS    2025250    200200   18.7600  145.2300      12.1       135       159        94
VIS    2025250    200200   18.7600  145.2100      13.8       139       160        96
VIS    2025250    200200   18.7600  145.1000      12.9       135       164        90
VIS    2025250    200200   18.7600  145.0800      16.5       146       166        97
VIS    2025250    200200   18.7400  144.7800      12.9       142       181        94
VIS    2025250    200200   18.7600  144.7500      12.8       141       180        95
VIS    2025250    200200   18.7400  144.7500      12.6       144       180        91
VIS    2025250    200200   18.7500  144.7200      13.1       162       179        95
VIS    2025250    200200   18.7600  144.6600      13.1       173       175        95
VIS    2025250    200200   18.7400  144.6500      12.8       172       178        94
VIS    2025250    200200   18.7400  144.6200      13.4       168       183        94
VIS    2025250    200200   18.7500  144.5300      19.8       174       189        91
VIS    2025250    200200   18.7400  144.4900      23.4       163       189        91
VIS    2025250    200200   18.7400  144.4300      22.0       159       188        92
VIS    2025250    200200   18.7400  144.4000      20.8       154       189        92
VIS    2025250    200200   18.7500  144.3800      24.1       157       190        90
VIS    2025250    200200   18.7400  144.3200      21.2       154       190        96
VIS    2025250    200200   18.7800  149.5400       8.2        36       978        96
VIS    2025250    200200   18.7600  149.3200       9.1        46       980        94
VIS    2025250    200200   18.7800  149.2700       8.5        43       976        96
VIS    2025250    200200   18.7800  149.2400       9.3        45       983        96
VIS    2025250    200200   18.7700  149.2400       9.5        44       987        96
VIS    2025250    200200   18.7800  149.1600       8.6        44       955        98
VIS    2025250    200200   18.7700  149.1300       8.6        40       928        99
VIS    2025250    200200   18.7800  149.0900       8.8        48       905        98
VIS    2025250    200200   18.7700  149.0700       8.8        46       905        99
VIS    2025250    200200   18.7600  149.0600       8.8        43       916        99
VIS    2025250    200200   18.7600  149.0300       8.6        40       926        99
VIS    2025250    200200   18.7700  148.9900       8.5        44       957        90
VIS    2025250    200200   18.7700  148.8000       9.3        45       967        97
VIS    2025250    200200   18.7600  148.7800       9.5        43       954        98
VIS    2025250    200200   18.7700  148.7700       9.2        44       951        98
VIS    2025250    200200   18.7600  148.7200       8.9        41       991        99
VIS    2025250    200200   18.7700  148.6100       8.0        61       912        93
VIS    2025250    200200   18.7500  148.4000       8.8        50       968        93
VIS    2025250    200200   18.7500  148.3800       8.8        57       956        94
VIS    2025250    200200   18.7700  148.3600       8.8        58       956        92
VIS    2025250    200200   18.7500  148.2500      10.2        40       987        98
VIS    2025250    200200   18.7500  148.2400       9.6        45       987        98
VIS    2025250    200200   18.7700  148.2200       9.5        63       974        92
VIS    2025250    200200   18.7500  148.1800      11.2        40       960        99
VIS    2025250    200200   18.7600  148.1500      11.7        40       897        96
VIS    2025250    200200   18.7600  148.1300      11.7        39       894        96
VIS    2025250    200200   18.7600  148.1200      11.5        38       897        96
VIS    2025250    200200   18.7400  148.0800      10.5        38       928        99
VIS    2025250    200200   18.7400  148.0400      10.3        36       967        99
VIS    2025250    200200   18.7600  148.0100      11.3        30       959        97
VIS    2025250    200200   18.7500  148.0000      11.3        30       955        97
VIS    2025250    200200   18.7600  147.9600      11.5        34       941        96
VIS    2025250    200200   18.7600  147.9500      11.6        34       939        95
VIS    2025250    200200   18.7400  147.9200      10.9        37       883        92
VIS    2025250    200200   18.7400  147.9000      10.3        41       800        90
VIS    2025250    200200   18.7500  147.8400      11.8        41       866        92
VIS    2025250    200200   18.7600  147.8100      11.1        44       859        95
VIS    2025250    200200   18.7500  147.8000      10.2        48       847        94
VIS    2025250    200200   18.7400  146.0700      13.4        61       195        92
VIS    2025250    200200   18.7300  146.0300      12.1        64       189        91
VIS    2025250    200200   18.7400  145.9900      11.7       119       187        92
VIS    2025250    200200   18.7300  145.9000      16.2        87       187        92
VIS    2025250    200200   18.7200  145.7200      10.9       113       163        90
VIS    2025250    200200   18.7400  145.6700      10.9       108       159        92
VIS    2025250    200200   18.7400  145.6500      10.6       107       159        91
VIS    2025250    200200   18.7400  145.5500      11.8       121       156        90
VIS    2025250    200200   18.7200  145.5300      11.6       120       152        90
VIS    2025250    200200   18.7200  145.2100      11.2       132       164        94
VIS    2025250    200200   18.7400  145.2000      13.8       138       163        94
VIS    2025250    200200   18.7200  145.0800      14.0       142       166        94
VIS    2025250    200200   18.7300  145.0700      15.8       145       166        96
VIS    2025250    200200   18.7200  144.9900      16.2       150       173        96
VIS    2025250    200200   18.7200  144.9800      15.5       149       177        98
VIS    2025250    200200   18.7100  144.8600      13.2       149       179        91
VIS    2025250    200200   18.7200  144.8600      13.2       150       180        93
VIS    2025250    200200   18.7200  144.8200      13.9       157       182        91
VIS    2025250    200200   18.7200  144.8000      14.0       153       182        92
VIS    2025250    200200   18.7300  144.7800      13.0       143       182        94
VIS    2025250    200200   18.7300  144.7500      12.6       144       181        91
VIS    2025250    200200   18.7200  144.6700      12.6       168       177        94
VIS    2025250    200200   18.7200  144.6600      12.6       171       175        95
VIS    2025250    200200   18.7300  144.6400      13.0       172       178        93
VIS    2025250    200200   18.7300  144.6100      13.6       165       185        92
VIS    2025250    200200   18.7300  144.5900      14.1       160       186        97
VIS    2025250    200200   18.7200  144.5700      15.5       158       186        94
VIS    2025250    200200   18.7200  144.5400      17.7       155       186        95
VIS    2025250    200200   18.7200  144.5000      24.7       161       188        90
VIS    2025250    200200   18.7100  144.4900      24.7       157       188        90
VIS    2025250    200200   18.7100  144.4600      24.1       158       187        91
VIS    2025250    200200   18.7100  144.4300      18.3       150       187        99
VIS    2025250    200200   18.7100  144.4100      19.7       151       188        98
VIS    2025250    200200   18.7200  144.3900      20.7       153       189        96
VIS    2025250    200200   18.7200  144.3100      21.1       153       190        96
VIS    2025250    200200   18.7300  144.2800      20.5       154       189        96
VIS    2025250    200200   18.7300  144.2600      21.4       156       188        95
VIS    2025250    200200   18.7500  149.5200       8.3        22       968        94
VIS    2025250    200200   18.7300  149.3000       9.0        48       980        91
VIS    2025250    200200   18.7500  149.2400       9.5        42       992        96
VIS    2025250    200200   18.7500  149.1700       8.6        45       972        94
VIS    2025250    200200   18.7500  149.1200       8.3        40       943        99
VIS    2025250    200200   18.7300  149.1000       8.7        40       948        98
VIS    2025250    200200   18.7400  149.0900       8.8        43       921        99
VIS    2025250    200200   18.7500  149.0400       8.7        38       926        98
VIS    2025250    200200   18.7500  149.0300       8.7        35       930        98
VIS    2025250    200200   18.7400  149.0000       9.0        29       972        96
VIS    2025250    200200   18.7500  148.9800       8.7        36       972        93
VIS    2025250    200200   18.7500  148.8100       9.0        45       985        97
VIS    2025250    200200   18.7400  148.7900       9.4        45       976        93
VIS    2025250    200200   18.7300  148.7800       9.3        42       976        93
VIS    2025250    200200   18.7300  148.6400      10.3        42       970        97
VIS    2025250    200200   18.7400  148.6100       9.8        48       951        95
VIS    2025250    200200   18.7500  148.6000       8.6        50       944        92
VIS    2025250    200200   18.7300  148.4400       9.0        37       981        93
VIS    2025250    200200   18.7300  148.4300       9.4        34       985        99
VIS    2025250    200200   18.7200  148.3900       8.8        53       968        92
VIS    2025250    200200   18.7300  148.3600       8.9        59       952        91
VIS    2025250    200200   18.7200  148.3400       8.9        59       964        90
VIS    2025250    200200   18.7400  148.2400      10.1        34       987        94
VIS    2025250    200200   18.7300  148.2100      10.7        26       966       100
VIS    2025250    200200   18.7300  148.1900      11.2        33       960        99
VIS    2025250    200200   18.7200  148.1800      11.3        33       940        99
VIS    2025250    200200   18.7200  148.1400      11.7        43       885       100
VIS    2025250    200200   18.7400  148.1100      11.4        37       894        98
VIS    2025250    200200   18.7400  148.1000      11.1        36       897        99
VIS    2025250    200200   18.7400  147.9900      11.4        30       955        99
VIS    2025250    200200   18.7200  147.9700      11.2        33       956        99
VIS    2025250    200200   18.7200  147.9500      11.4        33       950       100
VIS    2025250    200200   18.7300  147.9300      11.6        32       934        99
VIS    2025250    200200   18.7200  147.9100      11.2        35       858        97
VIS    2025250    200200   18.7200  147.8900      10.5        41       818        96
VIS    2025250    200200   18.7200  147.8400      10.5        43       848        99
VIS    2025250    200200   18.7400  147.8300      10.9        43       859        99
VIS    2025250    200200   18.7100  146.0500      13.4        54       193        92
VIS    2025250    200200   18.7200  146.0400      12.5        58       192        92
VIS    2025250    200200   18.7000  145.9000      16.6        89       185        96
VIS    2025250    200200   18.7000  145.7400      10.4       109       163        92
VIS    2025250    200200   18.7100  145.7100      10.5       110       163        91
VIS    2025250    200200   18.7200  145.6900      10.5       105       159        93
VIS    2025250    200200   18.7000  145.6600      10.1        92       158        92
VIS    2025250    200200   18.7200  145.6400      10.2       102       158        92
VIS    2025250    200200   18.7100  145.6000      11.3       106       158        92
VIS    2025250    200200   18.7100  145.6000      11.4       106       158        92
VIS    2025250    200200   18.7000  145.5700      10.8       109       157        93
VIS    2025250    200200   18.7000  145.5200      10.3       113       148        92
VIS    2025250    200200   18.7100  145.4900      10.1       111       146        92
VIS    2025250    200200   18.7100  145.2200      11.0       130       164        92
VIS    2025250    200200   18.7000  145.2100      10.4       131       165        93
VIS    2025250    200200   18.7000  145.1000      15.4       141       170        90
VIS    2025250    200200   18.7100  145.0700      13.8       144       168        90
VIS    2025250    200200   18.6900  145.0500      21.8       131       176        90
VIS    2025250    200200   18.6900  145.0300      20.6       133       176        93
VIS    2025250    200200   18.7000  144.9900      16.4       149       177        96
VIS    2025250    200200   18.7000  144.9900      16.1       149       177        97
VIS    2025250    200200   18.7100  144.9600      15.6       147       179        90
VIS    2025250    200200   18.6900  144.9200      13.2       142       179        90
VIS    2025250    200200   18.6900  144.9000      12.8       143       178        92
VIS    2025250    200200   18.7000  144.8700      13.6       147       179        93
VIS    2025250    200200   18.7100  144.8700      13.4       148       179        94
VIS    2025250    200200   18.7100  144.8100      14.2       155       182        92
VIS    2025250    200200   18.6900  144.7900      15.2       156       182        92
VIS    2025250    200200   18.6900  144.7600      13.9       150       184        93
VIS    2025250    200200   18.7100  144.6800      11.9       162       178        93
VIS    2025250    200200   18.7100  144.6700      11.8       164       177        93
VIS    2025250    200200   18.7000  144.6500      11.7       168       179        93
VIS    2025250    200200   18.7000  144.5000      25.0       155       188        90
VIS    2025250    200200   18.7100  144.4700      23.8       155       187        91
VIS    2025250    200200   18.7100  144.4300      18.8       150       187        99
VIS    2025250    200200   18.7000  144.4200      18.9       150       187        99
VIS    2025250    200200   18.7000  144.4000      19.8       151       188        98
VIS    2025250    200200   18.6900  144.3800      20.4       153       186        96
VIS    2025250    200200   18.7000  144.2900      15.3       168       189        93
VIS    2025250    200200   18.6900  144.2400      16.2       154       188        92
VIS    2025250    200200   18.7100  149.3100       8.8        45       963        93
VIS    2025250    200200   18.7300  149.0900       8.7        39       948        98
VIS    2025250    200200   18.7100  149.0600       8.6        33       958        99
VIS    2025250    200200   18.7100  148.7900       9.2        40       988        94
VIS    2025250    200200   18.7200  148.7700       9.1        40       967        94
VIS    2025250    200200   18.7200  148.6400      10.5        41       969        97
VIS    2025250    200200   18.7100  148.6200      11.2        38       951        98
VIS    2025250    200200   18.7100  148.5900      11.2        35       937        99
VIS    2025250    200200   18.7200  148.5800      10.0        37       900        98
VIS    2025250    200200   18.7200  148.5600       8.6        38       863        90
VIS    2025250    200200   18.7000  148.2800       9.2        44       987        94
VIS    2025250    200200   18.7200  148.2500      10.3        34       966        99
VIS    2025250    200200   18.7000  148.2100       9.7        30       941        98
VIS    2025250    200200   18.7100  148.2000      10.8        27       940        98
VIS    2025250    200200   18.7200  148.1900      11.1        31       940        99
VIS    2025250    200200   18.7200  148.1400      11.9        43       884       100
VIS    2025250    200200   18.7000  148.1200      12.5        39       885        99
VIS    2025250    200200   18.7000  148.0900      11.6        31       905        98
VIS    2025250    200200   18.6900  148.0300      11.1        31       976        98
VIS    2025250    200200   18.7000  148.0000      11.3        30       978        99
VIS    2025250    200200   18.7100  147.9700      11.1        33       956        99
VIS    2025250    200200   18.7100  147.9500      11.4        33       950       100
VIS    2025250    200200   18.7100  147.9300      11.4        33       933        99
VIS    2025250    200200   18.7100  147.9100      11.3        34       897        98
VIS    2025250    200200   18.6900  147.8800      10.5        39       826        96
VIS    2025250    200200   18.7000  147.8400      10.2        43       847        99
VIS    2025250    200200   18.7000  147.8300      10.1        42       844        99
VIS    2025250    200200   18.6800  146.0900      13.0        58       193        90
VIS    2025250    200200   18.6900  145.9000      16.8        98       184        91
VIS    2025250    200200   18.6900  145.6800      10.1       101       159        92
VIS    2025250    200200   18.6900  145.6600      10.1        91       158        92
VIS    2025250    200200   18.6800  145.6500      10.3        87       158        91
VIS    2025250    200200   18.6800  145.6300      10.5        89       158        92
VIS    2025250    200200   18.6900  145.5900      10.4       103       158        93
VIS    2025250    200200   18.6700  145.5600      11.2       101       156        94
VIS    2025250    200200   18.6900  145.5400      10.6       108       154        93
VIS    2025250    200200   18.6700  145.5100      10.2       107       152        92
VIS    2025250    200200   18.6700  145.5000       9.8       107       152        92
VIS    2025250    200200   18.6700  145.4800       9.6       106       153        91
VIS    2025250    200200   18.6800  145.4400       9.8       114       153        90
VIS    2025250    200200   18.6700  145.4300       9.8       116       156        90
VIS    2025250    200200   18.6800  145.4000       9.1       108       159        90
VIS    2025250    200200   18.6700  145.3800       8.5       105       163        90
VIS    2025250    200200   18.6700  145.3000       9.8       106       163        91
VIS    2025250    200200   18.6800  145.2900      10.9       115       163        92
VIS    2025250    200200   18.6900  145.2200      11.1       131       164        92
VIS    2025250    200200   18.6800  145.2000      10.0       127       166        91
VIS    2025250    200200   18.6700  145.1900      10.7       124       168        93
VIS    2025250    200200   18.6900  145.1400      16.3       135       169        90
VIS    2025250    200200   18.6700  145.0900      19.1       137       174        90
VIS    2025250    200200   18.6700  145.0400      21.5       131       176        90
VIS    2025250    200200   18.6900  145.0200      19.0       138       176        96
VIS    2025250    200200   18.6800  144.9900      16.1       146       179        99
VIS    2025250    200200   18.6700  144.9600      15.5       143       182        99
VIS    2025250    200200   18.6700  144.9400      14.5       143       182        94
VIS    2025250    200200   18.6800  144.9200      13.4       142       179        92
VIS    2025250    200200   18.6800  144.8900      13.2       145       178        90
VIS    2025250    200200   18.6600  144.7300      13.7       153       187        92
VIS    2025250    200200   18.6700  144.7100      13.2       151       186        95
VIS    2025250    200200   18.6800  144.7000      12.6       152       185        95
VIS    2025250    200200   18.6700  144.6800      11.1       145       185        91
VIS    2025250    200200   18.6700  144.5000      21.6       154       190        94
VIS    2025250    200200   18.6700  144.4800      21.9       154       190        93
VIS    2025250    200200   18.6800  144.4200      19.7       152       185        94
VIS    2025250    200200   18.6800  144.3900      20.3       154       186        96
VIS    2025250    200200   18.6700  144.3600      20.5       155       186        95
VIS    2025250    200200   18.6600  144.3400      19.9       154       185        95
VIS    2025250    200200   18.6700  144.3300      19.4       155       185        97
VIS    2025250    200200   18.6800  144.2700      12.5       168       188        91
VIS    2025250    200200   18.6700  144.2400      15.4       153       189        92
VIS    2025250    200200   18.7000  148.7900       9.3        40       988        94
VIS    2025250    200200   18.6800  148.7700       9.9        37       986        95
VIS    2025250    200200   18.6800  148.6700       8.3        47       985        90
VIS    2025250    200200   18.6900  148.6400       9.5        46       965        95
VIS    2025250    200200   18.7000  148.6100      11.1        38       941        99
VIS    2025250    200200   18.6800  148.5700       9.5        34       935        99
VIS    2025250    200200   18.6900  148.4000       8.2        50       968        91
VIS    2025250    200200   18.6800  148.3200       9.0        58       956        90
VIS    2025250    200200   18.6700  148.2900       9.0        53       962        92
VIS    2025250    200200   18.6900  148.2500       9.1        35       946        99
VIS    2025250    200200   18.6700  148.2400       8.8        38       945        96
VIS    2025250    200200   18.6900  148.2100       9.5        33       941        98
VIS    2025250    200200   18.6700  148.2000      10.3        37       938        99
VIS    2025250    200200   18.6800  148.1500      11.5        37       885        99
VIS    2025250    200200   18.6700  148.1300      12.0        37       879        99
VIS    2025250    200200   18.6700  148.1100      12.2        36       879        98
VIS    2025250    200200   18.6800  148.0900      11.9        28       905        97
VIS    2025250    200200   18.6700  148.0700      11.7        24       925        97
VIS    2025250    200200   18.6900  148.0500      11.3        25       930        96
VIS    2025250    200200   18.6800  148.0200      10.5        33       984        98
VIS    2025250    200200   18.6800  147.9800      10.2        31       984        98
VIS    2025250    200200   18.6800  147.9700      10.2        31       970        99
VIS    2025250    200200   18.6800  147.9500      10.5        33       959        98
VIS    2025250    200200   18.6900  147.9100      11.1        36       858        96
VIS    2025250    200200   18.6900  147.8800      10.6        38       817        95
VIS    2025250    200200   18.6800  147.6100      12.4        41       714        90
VIS    2025250    200200   18.6700  146.0900      13.3        58       193        90
VIS    2025250    200200   18.6700  146.0800      13.0        58       193        90
VIS    2025250    200200   18.6500  145.7100      10.1       102       161        92
VIS    2025250    200200   18.6500  145.6800      10.7        95       161        91
VIS    2025250    200200   18.6500  145.6500      11.5        94       161        90
VIS    2025250    200200   18.6700  145.6300      11.0        90       159        93
VIS    2025250    200200   18.6600  145.5500      11.1        99       156        94
VIS    2025250    200200   18.6500  145.5300      10.5        99       154        93
VIS    2025250    200200   18.6600  145.5000       9.8       104       154        92
VIS    2025250    200200   18.6600  145.4900       9.4       104       154        91
VIS    2025250    200200   18.6400  145.4500       8.5       107       158        90
VIS    2025250    200200   18.6500  145.4400       9.0       110       158        90
VIS    2025250    200200   18.6600  145.4200       9.6       114       158        91
VIS    2025250    200200   18.6500  145.3800       9.0       107       164        90
VIS    2025250    200200   18.6500  145.2600      12.4       120       166        90
VIS    2025250    200200   18.6500  145.2500      14.9       129       167        90
VIS    2025250    200200   18.6600  145.2200      13.8       131       171        95
VIS    2025250    200200   18.6600  145.1900      11.8       126       170        94
VIS    2025250    200200   18.6500  145.1700      13.2       128       170        93
VIS    2025250    200200   18.6500  145.1300      16.6       141       178        90
VIS    2025250    200200   18.6600  145.1300      17.7       139       171        92
VIS    2025250    200200   18.6500  145.0800      18.7       137       180        96
VIS    2025250    200200   18.6500  145.0600      19.4       136       183        94
VIS    2025250    200200   18.6600  145.0500      20.8       136       182        92
VIS    2025250    200200   18.6400  145.0100      18.3       147       182        98
VIS    2025250    200200   18.6500  145.0100      18.0       148       182        96
VIS    2025250    200200   18.6600  144.9700      16.3       146       182        98
VIS    2025250    200200   18.6500  144.9400      14.9       144       184        96
VIS    2025250    200200   18.6600  144.9300      14.4       143       184        90
VIS    2025250    200200   18.6400  144.8100      16.2       155       184        96
VIS    2025250    200200   18.6500  144.7200      12.9       152       187        94
VIS    2025250    200200   18.6500  144.7100      12.4       150       187        90
VIS    2025250    200200   18.6400  144.6700      11.9       136       188        92
VIS    2025250    200200   18.6400  144.6600      11.9       134       189        91
VIS    2025250    200200   18.6400  144.5200      17.5       162       189        92
VIS    2025250    200200   18.6600  144.3800      19.9       158       187        94
VIS    2025250    200200   18.6500  144.3500      20.8       155       186        94
VIS    2025250    200200   18.6400  144.3500      20.8       155       186        95
VIS    2025250    200200   18.6400  144.3100      20.3       159       185        92
VIS    2025250    200200   18.6500  144.2700      16.3       155       188        96
VIS    2025250    200200   18.6600  148.8700       9.1        40       986        96
VIS    2025250    200200   18.6600  148.8400       8.9        40       983        96
VIS    2025250    200200   18.6600  148.8300       8.7        39       983        96
VIS    2025250    200200   18.6700  148.7800       9.8        39       988        93
VIS    2025250    200200   18.6600  148.7600       9.6        39       981        95
VIS    2025250    200200   18.6700  148.6600       8.4        45       985        92
VIS    2025250    200200   18.6600  148.6200       9.4        41       942        98
VIS    2025250    200200   18.6700  148.5900       9.5        40       937        99
VIS    2025250    200200   18.6500  148.5800       9.2        40       936        99
VIS    2025250    200200   18.6500  148.3600       8.9        46       959        90
VIS    2025250    200200   18.6500  148.3200       9.4        44       956        96
VIS    2025250    200200   18.6700  148.3000       8.9        53       961        92
VIS    2025250    200200   18.6600  148.2500       9.0        43       974        95
VIS    2025250    200200   18.6500  148.2300       9.5        43       941        96
VIS    2025250    200200   18.6700  148.2000      10.4        37       938        99
VIS    2025250    200200   18.6600  148.1800      10.7        34       935        99
VIS    2025250    200200   18.6600  148.1700      10.9        34       896        98
VIS    2025250    200200   18.6600  148.1400      11.6        37       885        99
VIS    2025250    200200   18.6500  148.1100      11.3        37       890        98
VIS    2025250    200200   18.6500  148.0700      11.5        25       925        97
VIS    2025250    200200   18.6500  148.0400      11.2        25       958        93
VIS    2025250    200200   18.6600  147.9700       9.9        33       974        97
VIS    2025250    200200   18.6500  147.9500      10.2        34       959        98
VIS    2025250    200200   18.6500  147.6200      12.4        39       786        92
VIS    2025250    200200   18.6400  147.5900      12.3        36       769        90
VIS    2025250    200200   18.6300  145.7600      10.7       101       166        91
VIS    2025250    200200   18.6200  145.7500      10.4       100       165        91
VIS    2025250    200200   18.6300  145.7100      10.2        92       161        91
VIS    2025250    200200   18.6300  145.7100      10.3        92       161        91
VIS    2025250    200200   18.6400  145.6700      11.4        97       161        90
VIS    2025250    200200   18.6200  145.6100      12.0        98       160        90
VIS    2025250    200200   18.6200  145.5800      11.7       100       159        92
VIS    2025250    200200   18.6300  145.5500      11.0        97       156        94
VIS    2025250    200200   18.6400  145.5300      10.1        98       155        92
VIS    2025250    200200   18.6300  145.4900       8.9       100       155        90
VIS    2025250    200200   18.6300  145.2500      15.2       127       169        91
VIS    2025250    200200   18.6400  145.2400      15.8       126       169        91
VIS    2025250    200200   18.6300  145.2000      16.9       128       173        95
VIS    2025250    200200   18.6400  145.2000      15.6       128       171        95
VIS    2025250    200200   18.6200  145.1500      16.6       136       179        99
VIS    2025250    200200   18.6200  145.1400      17.4       136       183        98
VIS    2025250    200200   18.6200  145.1200      18.0       137       183        96
VIS    2025250    200200   18.6300  145.0800      18.7       141       183        97
VIS    2025250    200200   18.6200  145.0600      19.3       145       185        98
VIS    2025250    200200   18.6300  145.0500      19.2       143       185        98
VIS    2025250    200200   18.6400  145.0200      18.5       142       183        99
VIS    2025250    200200   18.6200  144.9900      18.2       150       186        98
VIS    2025250    200200   18.6200  144.9600      17.5       156       186        94
VIS    2025250    200200   18.6200  144.9300      17.2       162       185        92
VIS    2025250    200200   18.6200  144.8600      17.1       160       183        94
VIS    2025250    200200   18.6200  144.8300      17.2       164       184        92
VIS    2025250    200200   18.6300  144.8300      16.2       163       184        91
VIS    2025250    200200   18.6200  144.8100      15.3       157       184        92
VIS    2025250    200200   18.6300  144.6900      12.9       143       188        95
VIS    2025250    200200   18.6300  144.6700      12.7       136       189        92
VIS    2025250    200200   18.6300  144.6500      12.1       132       189        90
VIS    2025250    200200   18.6100  144.5000      17.2       166       188        94
VIS    2025250    200200   18.6100  144.4500      17.7       151       195        99
VIS    2025250    200200   18.6200  144.4200      16.9       157       191        96
VIS    2025250    200200   18.6300  144.3700      21.0       157       187        92
VIS    2025250    200200   18.6200  144.3500      22.2       157       187        94
VIS    2025250    200200   18.6100  144.3400      22.3       158       187        94
VIS    2025250    200200   18.6200  144.3100      20.7       162       188        94
VIS    2025250    200200   18.6100  144.2700      21.8       157       189        94
VIS    2025250    200200   18.6200  144.2700      21.5       156       189        95
VIS    2025250    200200   18.6500  149.1000       8.4        43       984        94
VIS    2025250    200200   18.6300  148.9200       8.8        35       993        96
VIS    2025250    200200   18.6500  148.8700       9.6        42       993        94
VIS    2025250    200200   18.6500  148.8500       9.1        40       981        96
VIS    2025250    200200   18.6300  148.8000       8.9        42       981        95
VIS    2025250    200200   18.6300  148.8000       9.0        44       981        94
VIS    2025250    200200   18.6300  148.6700       8.9        39       985        97
VIS    2025250    200200   18.6400  148.6400       9.5        34       965        99
VIS    2025250    200200   18.6500  148.6100       9.4        39       942        99
VIS    2025250    200200   18.6400  148.5800       9.8        40       938        99
VIS    2025250    200200   18.6300  148.5700      10.3        39       935        99
VIS    2025250    200200   18.6200  148.3600       9.0        50       934        95
VIS    2025250    200200   18.6300  148.3300       9.6        39       924       100
VIS    2025250    200200   18.6300  148.3300       9.7        40       915       100
VIS    2025250    200200   18.6400  148.2500       9.1        48       975        93
VIS    2025250    200200   18.6400  148.2100      10.1        41       935        97
VIS    2025250    200200   18.6400  148.1900      10.6        34       935        98
VIS    2025250    200200   18.6300  148.1800      10.7        32       911        98
VIS    2025250    200200   18.6300  148.1500      10.8        32       896        97
VIS    2025250    200200   18.6200  148.1200      10.8        39       890        98
VIS    2025250    200200   18.6400  148.1000      11.2        36       890        97
VIS    2025250    200200   18.6400  148.0800      11.6        29       916        97
VIS    2025250    200200   18.6300  148.0600      11.4        27       941        99
VIS    2025250    200200   18.6400  147.9800      10.5        35       972        98
VIS    2025250    200200   18.6300  147.6200      12.4        40       782        90
VIS    2025250    200200   18.6300  147.6100      12.4        38       786        91
VIS    2025250    200200   18.6200  146.0900      14.0        79       190        91
VIS    2025250    200200   18.6200  145.7500      10.3       100       166        92
VIS    2025250    200200   18.6000  145.7400      10.5        96       162        91
VIS    2025250    200200   18.6200  145.7000      10.6        93       161        92
VIS    2025250    200200   18.6100  145.6900      11.2        97       161        94
VIS    2025250    200200   18.6000  145.6500      12.1        98       162        94
VIS    2025250    200200   18.6100  145.6300      12.4        96       161        94
VIS    2025250    200200   18.6200  145.6100      12.1        98       160        92
VIS    2025250    200200   18.6000  145.5800      11.6        97       158        95
VIS    2025250    200200   18.6000  145.5700      11.3        98       158        94
VIS    2025250    200200   18.6000  145.5400      10.2        96       156        90
VIS    2025250    200200   18.6100  145.5300       9.8        95       156        91
VIS    2025250    200200   18.6000  145.3000      11.8       121       167        92
VIS    2025250    200200   18.6100  145.2100      18.1       131       175        91
VIS    2025250    200200   18.6000  145.1600      18.5       137       183        94
VIS    2025250    200200   18.5900  145.1400      19.6       139       183        94
VIS    2025250    200200   18.6100  145.1200      18.4       138       183        95
VIS    2025250    200200   18.6000  145.1100      19.3       141       184        95
VIS    2025250    200200   18.6000  145.0700      19.9       145       185        97
VIS    2025250    200200   18.6100  145.0500      19.7       146       185        97
VIS    2025250    200200   18.6100  145.0200      19.0       149       188        98
VIS    2025250    200200   18.6100  144.9600      17.9       157       189        95
VIS    2025250    200200   18.6000  144.9400      17.8       160       189        94
VIS    2025250    200200   18.5900  144.8800      17.4       162       188        94
VIS    2025250    200200   18.6100  144.8500      17.5       163       184        91
VIS    2025250    200200   18.6100  144.8400      17.5       163       184        92
VIS    2025250    200200   18.5900  144.7100      18.3       167       194        94
VIS    2025250    200200   18.6000  144.4600      17.0       154       195        98
VIS    2025250    200200   18.6100  144.4500      17.6       150       195       100
VIS    2025250    200200   18.6100  144.3500      22.5       158       187        93
VIS    2025250    200200   18.6100  144.3300      21.2       161       188        94
VIS    2025250    200200   18.6000  144.3100      20.6       161       188        95
VIS    2025250    200200   18.6100  144.2800      21.5       159       188        95
VIS    2025250    200200   18.6100  144.2500      21.5       151       193        96
VIS    2025250    200200   18.6300  149.0700       8.6        41       985        94
VIS    2025250    200200   18.6100  148.9300       8.9        23       995        99
VIS    2025250    200200   18.6100  148.9100       8.7        42       986        91
VIS    2025250    200200   18.6100  148.8900       9.2        47       983        90
VIS    2025250    200200   18.6200  148.8600       9.4        46       973        93
VIS    2025250    200200   18.6200  148.8200       8.9        36       980        98
VIS    2025250    200200   18.6100  148.8100       8.8        39       980        96
VIS    2025250    200200   18.6000  148.7800       8.8        46       947        96
VIS    2025250    200200   18.6000  148.6900       9.1        43       986        95
VIS    2025250    200200   18.6000  148.6500       9.3        39       948        97
VIS    2025250    200200   18.6000  148.6400       9.3        36       947        98
VIS    2025250    200200   18.6100  148.6000       9.6        39       934        99
VIS    2025250    200200   18.6200  148.5900       9.9        39       934       100
VIS    2025250    200200   18.6200  148.5600      10.5        38       935        99
VIS    2025250    200200   18.6100  148.5400       9.9        40       935        98
VIS    2025250    200200   18.6100  148.3800       8.4        60       954        90
VIS    2025250    200200   18.6000  148.3600       9.2        51       915        97
VIS    2025250    200200   18.6000  148.3300       9.8        48       893       100
VIS    2025250    200200   18.6000  148.3000       9.8        45       895        99
VIS    2025250    200200   18.6000  148.2500       9.9        46       975        92
VIS    2025250    200200   18.6100  148.2500      10.0        44       975        92
VIS    2025250    200200   18.6100  148.2100       9.7        46       921        96
VIS    2025250    200200   18.6100  148.1800      10.1        34       911        97
VIS    2025250    200200   18.6100  148.1700      10.0        34       911        97
VIS    2025250    200200   18.6000  148.1500       9.9        36       908        97
VIS    2025250    200200   18.6100  148.1200      10.4        39       891        98
VIS    2025250    200200   18.6100  148.0800      11.1        32       923        98
VIS    2025250    200200   18.6000  148.0500      11.4        29       938        99
VIS    2025250    200200   18.6000  148.0400      11.3        28       953       100
VIS    2025250    200200   18.6000  148.0200      11.4        29       958        98
VIS    2025250    200200   18.6100  147.6100      12.1        41       782        91
VIS    2025250    200200   18.5900  147.6000      11.8        41       817        96
VIS    2025250    200200   18.5700  145.8900      14.0       101       171        90
VIS    2025250    200200   18.5700  145.8600      12.1        97       169        91
VIS    2025250    200200   18.5700  145.8200      11.1        90       169        90
VIS    2025250    200200   18.5700  145.7800      11.2        89       168        91
VIS    2025250    200200   18.5700  145.7500      11.9        92       167        93
VIS    2025250    200200   18.5800  145.7200      11.0        93       161        93
VIS    2025250    200200   18.5700  145.7000      11.4        95       164        94
VIS    2025250    200200   18.5800  145.6900      11.6        96       163        94
VIS    2025250    200200   18.5700  145.6600      12.3        96       163        93
VIS    2025250    200200   18.5900  145.6200      12.5        97       162        96
VIS    2025250    200200   18.5800  145.6200      12.3        99       162        95
VIS    2025250    200200   18.5700  145.5800      11.5        94       157        95
VIS    2025250    200200   18.5900  145.5600      10.8        97       156        93
VIS    2025250    200200   18.5800  145.5400      10.1        94       156        90
VIS    2025250    200200   18.5900  145.5000       9.5        94       158        90
VIS    2025250    200200   18.5900  145.5000       9.6        95       158        90
VIS    2025250    200200   18.5700  145.3300      11.6       110       166        92
VIS    2025250    200200   18.5700  145.3200      12.1       113       165        93
VIS    2025250    200200   18.5700  145.2800      16.7       127       168        91
VIS    2025250    200200   18.5800  145.1800      20.5       136       183        93
VIS    2025250    200200   18.5900  145.1400      20.2       140       185        94
VIS    2025250    200200   18.5800  145.0900      20.3       146       190        97
VIS    2025250    200200   18.5700  144.7500      17.5       169       191        92
VIS    2025250    200200   18.5700  144.7400      17.8       166       194        93
VIS    2025250    200200   18.5600  144.4500      22.8       160       193        92
VIS    2025250    200200   18.5700  144.3400      20.5       159       188        94
VIS    2025250    200200   18.5700  144.3100      18.5       161       188        95
VIS    2025250    200200   18.5800  144.2800      18.3       166       188        96
VIS    2025250    200200   18.5700  144.2700      19.1       165       190        94
VIS    2025250    200200   18.5700  144.2400      20.4       161       193        95
VIS    2025250    200200   18.5800  148.9300       9.2        23       995        93
VIS    2025250    200200   18.6000  148.9000       8.8        38       986        90
VIS    2025250    200200   18.6000  148.9000       8.9        43       986        91
VIS    2025250    200200   18.5800  148.8600       9.1        46       962        95
VIS    2025250    200200   18.5900  148.8400       8.7        41       957        95
VIS    2025250    200200   18.5900  148.8200       8.8        39       956        95
VIS    2025250    200200   18.5800  148.7800       8.5        43       926        93
VIS    2025250    200200   18.6000  148.7700       8.6        45       947        96
VIS    2025250    200200   18.5900  148.7500       8.1        37       979        93
VIS    2025250    200200   18.5800  148.7300       7.7        26       998        96
VIS    2025250    200200   18.6000  148.6900       9.2        43       985        95
VIS    2025250    200200   18.5800  148.6600       9.6        40       945        94
VIS    2025250    200200   18.5900  148.6500       9.6        40       947        93
VIS    2025250    200200   18.5800  148.6100       9.1        39       945        98
VIS    2025250    200200   18.6000  148.6000       9.5        37       932        99
VIS    2025250    200200   18.5800  148.5500      10.0        42       935        96
VIS    2025250    200200   18.5900  148.3800       8.4        54       967        90
VIS    2025250    200200   18.5800  148.3600       9.1        52       925        96
VIS    2025250    200200   18.5900  148.3500       9.3        51       903        99
VIS    2025250    200200   18.5800  148.3100      10.1        47       891        99
VIS    2025250    200200   18.5900  148.3000       9.8        44       895       100
VIS    2025250    200200   18.5800  148.2100       9.5        55       921        93
VIS    2025250    200200   18.5800  148.1900       9.4        47       911        95
VIS    2025250    200200   18.5800  148.1600      10.0        37       911        97
VIS    2025250    200200   18.5900  148.1400       9.7        38       908        97
VIS    2025250    200200   18.5700  148.1300       9.4        41       905        96
VIS    2025250    200200   18.5900  148.0900      10.9        35       906        99
VIS    2025250    200200   18.5800  148.0600      11.4        32       915        99
VIS    2025250    200200   18.5800  148.0400      11.3        29       930        99
VIS    2025250    200200   18.5700  148.0300      11.3        29       930        99
VIS    2025250    200200   18.5900  147.6000      11.8        40       817        96
VIS    2025250    200200   18.5600  145.8600      12.0        98       169        91
VIS    2025250    200200   18.5500  145.8300      10.8        92       169        91
VIS    2025250    200200   18.5700  145.8200      11.1        90       169        90
VIS    2025250    200200   18.5500  145.7900      10.8        88       167        92
VIS    2025250    200200   18.5700  145.7600      12.1        92       168        93
VIS    2025250    200200   18.5500  145.7400      12.1        92       167        94
VIS    2025250    200200   18.5600  145.7100      11.4        93       165        93
VIS    2025250    200200   18.5700  145.6900      11.7        95       164        94
VIS    2025250    200200   18.5500  145.6500      11.7        97       164        93
VIS    2025250    200200   18.5600  145.6500      11.6        98       163        94
VIS    2025250    200200   18.5500  145.6100      12.4        97       160        95
VIS    2025250    200200   18.5500  145.6000      12.4        97       160        96
VIS    2025250    200200   18.5600  145.5600      10.5        89       157        91
VIS    2025250    200200   18.5500  145.5500      10.0        86       160        90
VIS    2025250    200200   18.5500  145.5000       9.8        93       163        90
VIS    2025250    200200   18.5500  145.4000      10.0        98       164        91
VIS    2025250    200200   18.5600  145.2000      20.5       134       188        90
VIS    2025250    200200   18.5500  144.7700      17.0       167       189        93
VIS    2025250    200200   18.5600  144.7500      17.4       169       191        94
VIS    2025250    200200   18.5500  144.7100      16.5       166       194        95
VIS    2025250    200200   18.5600  144.5100      15.6       168       189        91
VIS    2025250    200200   18.5400  144.4900      16.7       162       189        97
VIS    2025250    200200   18.5400  144.4700      17.4       159       189        98
VIS    2025250    200200   18.5500  144.2400      20.2       166       193        93
VIS    2025250    200200   18.5800  149.2600       8.8        42       999        93
VIS    2025250    200200   18.5800  149.2300       8.7        45       998        94
VIS    2025250    200200   18.5700  149.2200       8.8        45       999        93
VIS    2025250    200200   18.5700  148.9400       9.3        27       995        95
VIS    2025250    200200   18.5700  148.9300       9.2        27       995        94
VIS    2025250    200200   18.5800  148.9100       9.0        31       989        92
VIS    2025250    200200   18.5800  148.8700       9.1        45       971        94
VIS    2025250    200200   18.5600  148.8500       8.5        45       971        95
VIS    2025250    200200   18.5700  148.8100       8.5        48       926        97
VIS    2025250    200200   18.5600  148.8000       8.6        48       917        98
VIS    2025250    200200   18.5700  148.7600       7.9        31       926        95
VIS    2025250    200200   18.5600  148.7400       7.6        32       937        93
VIS    2025250    200200   18.5600  148.7200       7.7        37       958        91
VIS    2025250    200200   18.5500  148.7100       8.3        46       985        94
VIS    2025250    200200   18.5700  148.6600       9.2        37       949        90
VIS    2025250    200200   18.5600  148.6500       9.4        36       949        94
VIS    2025250    200200   18.5700  148.6200       9.4        39       947        98
VIS    2025250    200200   18.5700  148.6000       8.9        39       945        98
VIS    2025250    200200   18.5600  148.5800       9.0        36       954        93
VIS    2025250    200200   18.5700  148.3600       9.1        53       925        95
VIS    2025250    200200   18.5500  148.3400       9.4        56       925        94
VIS    2025250    200200   18.5600  148.3300       9.6        55       915        96
VIS    2025250    200200   18.5500  148.2900      10.9        36       904        98
VIS    2025250    200200   18.5500  148.2600      11.1        33       939        99
VIS    2025250    200200   18.5500  148.2400       9.2        44       974        94
VIS    2025250    200200   18.5700  148.2100       9.3        57       936        90
VIS    2025250    200200   18.5700  148.2000       9.2        57       925        90
VIS    2025250    200200   18.5700  148.1600       9.6        40       913        96
VIS    2025250    200200   18.5600  148.1400       9.3        39       908        96
VIS    2025250    200200   18.5700  148.1200       9.3        41       905        96
VIS    2025250    200200   18.5600  148.0900       9.9        39       908        98
VIS    2025250    200200   18.5500  148.0600      10.5        36       915        99
VIS    2025250    200200   18.5500  148.0500      10.7        35       915        99
VIS    2025250    200200   18.5700  148.0200      11.4        28       948       100
VIS    2025250    200200   18.5700  147.9900      11.4        27       948        99
VIS    2025250    200200   18.5500  147.9400      10.8        36       936        95
VIS    2025250    200200   18.5500  147.6100      12.4        41       833        99
VIS    2025250    200200   18.5400  147.4900      11.6        46       703        92
VIS    2025250    200200   18.5400  145.8500      11.7        96       169        90
VIS    2025250    200200   18.5400  145.8200      10.4        91       169        91
VIS    2025250    200200   18.5300  145.8000      10.2        88       168        91
VIS    2025250    200200   18.5400  145.7900      10.5        88       167        92
VIS    2025250    200200   18.5200  145.7700      11.5        89       167        93
VIS    2025250    200200   18.5400  145.7500      12.3        91       167        94
VIS    2025250    200200   18.5400  145.7200      12.0        95       166        94
VIS    2025250    200200   18.5200  145.7000      11.9       101       168        93
VIS    2025250    200200   18.5300  145.6600      11.9        94       164        94
VIS    2025250    200200   18.5200  145.6300      12.2        99       161        96
VIS    2025250    200200   18.5400  145.6000      12.6        98       160        95
VIS    2025250    200200   18.5400  145.6000      12.4        98       160        96
VIS    2025250    200200   18.5400  145.5100       9.6        91       163        90
VIS    2025250    200200   18.5400  145.4900       9.8        91       164        91
VIS    2025250    200200   18.5300  145.4600       9.9        93       165        91
VIS    2025250    200200   18.5300  145.4300      10.5       101       165        91
VIS    2025250    200200   18.5300  145.4000      13.0        97       165        96
VIS    2025250    200200   18.5400  144.7800      16.8       167       189        93
VIS    2025250    200200   18.5300  144.7600      16.8       169       188        91
VIS    2025250    200200   18.5300  144.7500      16.8       169       188        92
VIS    2025250    200200   18.5300  144.7100      15.9       171       194        92
VIS    2025250    200200   18.5200  144.5300      16.5       155       194        98
VIS    2025250    200200   18.5300  144.4800      16.2       160       189        94
VIS    2025250    200200   18.5100  144.4600      16.1       159       190        93
VIS    2025250    200200   18.5300  144.2500      19.3       173       192        91
VIS    2025250    200200   18.5400  149.2600       9.5        41       998        93
VIS    2025250    200200   18.5400  149.2400       9.1        40       998        95
VIS    2025250    200200   18.5500  149.2100       8.8        43       998        94
VIS    2025250    200200   18.5400  149.2100       8.9        43       998        93
VIS    2025250    200200   18.5400  148.9300       9.2        40       975        93
VIS    2025250    200200   18.5300  148.9100       9.5        44       966        94
VIS    2025250    200200   18.5400  148.8800       8.9        41       957        98
VIS    2025250    200200   18.5400  148.8500       8.7        41       977        96
VIS    2025250    200200   18.5400  148.8500       8.7        40       977        96
VIS    2025250    200200   18.5500  148.8000       8.7        49       917        99
VIS    2025250    200200   18.5400  148.7900       9.1        46       916        99
VIS    2025250    200200   18.5500  148.7700       8.8        40       916        91
VIS    2025250    200200   18.5300  148.7300       8.6        42       902        98
VIS    2025250    200200   18.5500  148.7200       8.1        44       948        95
VIS    2025250    200200   18.5400  148.6400       9.3        38       958        91
VIS    2025250    200200   18.5300  148.4800       9.2        30       903        92
VIS    2025250    200200   18.5400  148.4500       9.6        38       965        98
VIS    2025250    200200   18.5300  148.4400       9.7        38       977        98
VIS    2025250    200200   18.5400  148.3700       9.1        59       969        90
VIS    2025250    200200   18.5500  148.3400       9.4        55       925        94
VIS    2025250    200200   18.5300  148.3100      10.3        44       915        99
VIS    2025250    200200   18.5300  148.2800      11.5        33       924        98
VIS    2025250    200200   18.5200  148.2700      11.5        32       939        98
VIS    2025250    200200   18.5400  148.2500      10.6        35       965        99
VIS    2025250    200200   18.5400  148.1800       9.2        56       946        91
VIS    2025250    200200   18.5400  148.1400       9.1        43       946        93
VIS    2025250    200200   18.5200  148.1200       9.1        47       905        95
VIS    2025250    200200   18.5400  148.0900       9.6        40       910        97
VIS    2025250    200200   18.5300  148.0600      10.1        37       915        98
VIS    2025250    200200   18.5300  148.0400      10.5        35       916        99
VIS    2025250    200200   18.5200  148.0200      10.8        32       926        98
VIS    2025250    200200   18.5300  148.0000      11.2        28       930        98
VIS    2025250    200200   18.5200  147.9700      11.0        29       940        99
VIS    2025250    200200   18.5200  147.9500      10.7        31       950        99
VIS    2025250    200200   18.5400  147.5000      11.6        45       709        90
VIS    2025250    200200   18.5000  145.9400      10.1        94       172        90
VIS    2025250    200200   18.5100  145.9100      11.3        95       172        90
VIS    2025250    200200   18.5100  145.7900      10.3        84       167        91
VIS    2025250    200200   18.5200  145.7700      11.4        88       167        93
VIS    2025250    200200   18.5000  145.7200      11.3        90       169        91
VIS    2025250    200200   18.5100  145.7000      11.7        97       168        94
VIS    2025250    200200   18.5100  145.7000      11.7       100       168        94
VIS    2025250    200200   18.5100  145.6700      12.2        95       166        95
VIS    2025250    200200   18.5000  145.6400      11.8        96       161        94
VIS    2025250    200200   18.5100  145.6200      11.9        98       161        95
VIS    2025250    200200   18.5000  145.5800      10.8        87       161        92
VIS    2025250    200200   18.5100  145.5000       9.0        90       165        90
VIS    2025250    200200   18.5100  145.4700       9.4        97       165        91
VIS    2025250    200200   18.5000  145.4400       9.7       113       165        90
VIS    2025250    200200   18.5100  145.3800      15.1        89       172        90
VIS    2025250    200200   18.5100  145.3800      14.9        89       172        96
VIS    2025250    200200   18.5100  145.2600      14.1       123       183        90
VIS    2025250    200200   18.5000  144.7700      16.7       168       188        91
VIS    2025250    200200   18.5100  144.7400      16.5       169       188        95
VIS    2025250    200200   18.4900  144.7100      15.9       176       194        91
VIS    2025250    200200   18.5000  144.5000      15.4       164       189        92
VIS    2025250    200200   18.4900  144.4400      17.3       162       190        91
VIS    2025250    200200   18.4900  144.4100      20.3       167       191        93
VIS    2025250    200200   18.4900  144.3200      18.4       178       188        90
VIS    2025250    200200   18.5000  144.3100      18.4       175       188        91
VIS    2025250    200200   18.5200  149.2600       9.4        40       988        94
VIS    2025250    200200   18.5200  149.2400       9.2        41       988        95
VIS    2025250    200200   18.5300  149.2100       9.1        43       994        94
VIS    2025250    200200   18.5300  149.2000       9.1        44       994        93
VIS    2025250    200200   18.5200  148.9200       9.6        46       966        93
VIS    2025250    200200   18.5100  148.9100       9.6        45       965        93
VIS    2025250    200200   18.5200  148.8400       8.9        39       977        95
VIS    2025250    200200   18.5200  148.8400       8.9        39       977        94
VIS    2025250    200200   18.5100  148.7900       9.0        43       935        99
VIS    2025250    200200   18.5100  148.7900       8.9        42       931        99
VIS    2025250    200200   18.5100  148.7600       9.0        34       895        96
VIS    2025250    200200   18.5200  148.7200       8.7        45       872        98
VIS    2025250    200200   18.5200  148.7000       8.5        49       948        90
VIS    2025250    200200   18.5200  148.6400       8.7        39       961        92
VIS    2025250    200200   18.5000  148.6100       8.6        38       961        93
VIS    2025250    200200   18.5200  148.5600       8.8        45       962        90
VIS    2025250    200200   18.5100  148.5100       8.7        37       927        93
VIS    2025250    200200   18.5200  148.4500       9.3        36       965        96
VIS    2025250    200200   18.5200  148.4400       9.6        37       977        98
VIS    2025250    200200   18.5100  148.4100       9.3        43       999        92
VIS    2025250    200200   18.5200  148.3500       9.6        52       947        93
VIS    2025250    200200   18.5200  148.3300       9.9        47       932        97
VIS    2025250    200200   18.5100  148.3000      10.6        37       932        99
VIS    2025250    200200   18.5000  148.2800      11.8        31       944        97
VIS    2025250    200200   18.5000  148.2700      11.4        33       949        97
VIS    2025250    200200   18.5000  148.2400      10.2        45       965        94
VIS    2025250    200200   18.5100  148.2000       8.8        60       936        91
VIS    2025250    200200   18.5000  148.1700      10.3        46       936        96
VIS    2025250    200200   18.5000  148.1700      10.3        46       936        96
VIS    2025250    200200   18.5200  148.1300       9.2        47       908        95
VIS    2025250    200200   18.5000  148.1000       9.6        39       905        97
VIS    2025250    200200   18.5100  148.0900       9.5        37       905        96
VIS    2025250    200200   18.5000  148.0600      10.1        33       910        96
VIS    2025250    200200   18.5000  148.0300      10.5        36       916        98
VIS    2025250    200200   18.5200  148.0200      10.6        34       923        98
VIS    2025250    200200   18.5100  147.9600      10.9        28       950        98
VIS    2025250    200200   18.5100  147.9500      10.8        28       950        98
VIS    2025250    200200   18.4800  145.9000      10.7        95       173        90
VIS    2025250    200200   18.4800  145.8800      10.1        94       173        90
VIS    2025250    200200   18.4800  145.8400      10.6        93       169        91
VIS    2025250    200200   18.4800  145.8300      10.5        92       170        91
VIS    2025250    200200   18.4800  145.8000      11.8        89       170        90
VIS    2025250    200200   18.4800  145.7700      11.0        91       173        91
VIS    2025250    200200   18.4800  145.7500      10.9        87       172        91
VIS    2025250    200200   18.4900  145.7200      11.2        89       168        91
VIS    2025250    200200   18.4800  145.7100      11.2        90       168        91
VIS    2025250    200200   18.4800  145.6700      12.2        92       166        93
VIS    2025250    200200   18.4700  145.6600      11.9        89       166        92
VIS    2025250    200200   18.4700  145.6200      11.0        85       161        92
VIS    2025250    200200   18.4900  145.6100      11.1        92       161        93
VIS    2025250    200200   18.4900  145.5700      10.3        87       161        90
VIS    2025250    200200   18.4800  145.4400       8.8       113       165        90
VIS    2025250    200200   18.4700  145.3300      13.9       106       183        97
VIS    2025250    200200   18.4800  145.3000      11.9       117       185        92
VIS    2025250    200200   18.4700  145.2900      12.7       117       189        93
VIS    2025250    200200   18.4700  145.2700      13.7       115       189        93
VIS    2025250    200200   18.4800  144.7500      16.5       165       190        91
VIS    2025250    200200   18.4700  144.7400      16.2       164       191        94
VIS    2025250    200200   18.4900  144.7100      15.8       175       194        91
VIS    2025250    200200   18.4700  144.6800      15.3       173       192        92
VIS    2025250    200200   18.4700  144.6000      14.0       162       193        95
VIS    2025250    200200   18.4700  144.5800      13.1       166       193        92
VIS    2025250    200200   18.4700  144.4300      16.0       165       191        96
VIS    2025250    200200   18.4700  144.4200      17.6       167       192        95
VIS    2025250    200200   18.4700  144.2900      16.4       176       189        92
VIS    2025250    200200   18.4900  149.3300       8.0        36       987        97
VIS    2025250    200200   18.4900  149.3200       8.1        37       987        97
VIS    2025250    200200   18.4900  149.2800       8.9        41       977        94
VIS    2025250    200200   18.5000  149.2500       9.5        39       980        94
VIS    2025250    200200   18.5000  149.2500       9.5        39       980        96
VIS    2025250    200200   18.4900  149.2200       9.1        39       977        96
VIS    2025250    200200   18.5000  149.2000       9.0        42       979        95
VIS    2025250    200200   18.4900  149.1700       8.9        48       994        92
VIS    2025250    200200   18.5000  148.9300       9.8        46       966        92
VIS    2025250    200200   18.4900  148.9100       9.7        41       965        95
VIS    2025250    200200   18.4800  148.8800       8.9        36       946        96
VIS    2025250    200200   18.4900  148.8700       8.8        36       946        96
VIS    2025250    200200   18.4800  148.8400       9.0        37       963        91
VIS    2025250    200200   18.5000  148.8000       9.0        43       941        97
VIS    2025250    200200   18.5000  148.7900       9.0        42       933        99
VIS    2025250    200200   18.5000  148.7700       9.0        38       913        99
VIS    2025250    200200   18.5000  148.7500       9.0        34       877        96
VIS    2025250    200200   18.4900  148.7200       9.0        39       872        97
VIS    2025250    200200   18.5000  148.6900       8.8        44       948        93
VIS    2025250    200200   18.4800  148.6600       8.9        37       964        97
VIS    2025250    200200   18.4800  148.6500       8.7        38       974        95
VIS    2025250    200200   18.4900  148.6200       8.7        38       975        95
VIS    2025250    200200   18.4800  148.5600       9.8        35       985        97
VIS    2025250    200200   18.5000  148.5300       8.9        39       968        90
VIS    2025250    200200   18.4800  148.5000       8.8        41       927        94
VIS    2025250    200200   18.4900  148.5000       8.5        45       925        91
VIS    2025250    200200   18.4800  148.3700      10.9        27       998        92
VIS    2025250    200200   18.5000  148.3300      10.1        43       932        97
VIS    2025250    200200   18.4900  148.3100      10.7        37       944        96
VIS    2025250    200200   18.4900  148.2900      10.8        34       947        95
VIS    2025250    200200   18.4900  148.2600      10.8        36       965        95
VIS    2025250    200200   18.4900  148.2500      10.5        42       965        94
VIS    2025250    200200   18.4700  148.2200      10.0        44       964        95
VIS    2025250    200200   18.4900  148.1800      10.6        40       936        97
VIS    2025250    200200   18.4900  148.1700      10.6        42       936        97
VIS    2025250    200200   18.4700  148.1500      11.1        35       943        97
VIS    2025250    200200   18.4900  148.1100       9.7        39       905        97
VIS    2025250    200200   18.4800  148.1000       9.8        36       905        97
VIS    2025250    200200   18.4900  148.0800       9.9        32       905        96
VIS    2025250    200200   18.4800  148.0300      10.1        36       910        98
VIS    2025250    200200   18.4700  148.0300      10.0        37       910        98
VIS    2025250    200200   18.4900  147.9900      11.0        31       930        98
VIS    2025250    200200   18.4900  147.9600      10.6        27       950        96
VIS    2025250    200200   18.4900  147.9600      10.5        27       950        96
VIS    2025250    200200   18.4700  145.8700       9.8        92       172        90
VIS    2025250    200200   18.4500  145.8600       9.9        92       170        90
VIS    2025250    200200   18.4700  145.8400      10.3        90       170        91
VIS    2025250    200200   18.4700  145.8100      11.4        86       170        93
VIS    2025250    200200   18.4700  145.8000      11.7        88       171        93
VIS    2025250    200200   18.4600  145.7700      11.3        95       174        91
VIS    2025250    200200   18.4500  145.7300      11.1        85       169        91
VIS    2025250    200200   18.4600  145.7000      11.6        86       168        91
VIS    2025250    200200   18.4700  145.7000      11.8        88       167        93
VIS    2025250    200200   18.4600  145.6700      11.8        88       166        92
VIS    2025250    200200   18.4500  145.6500      11.6        86       162        92
VIS    2025250    200200   18.4500  145.6100      11.1        78       162        90
VIS    2025250    200200   18.4500  145.5900      10.6        79       163        90
VIS    2025250    200200   18.4500  145.4600       8.5        98       165        90
VIS    2025250    200200   18.4500  145.3700      12.8        99       183        93
VIS    2025250    200200   18.4500  145.3400      14.5       103       188        97
VIS    2025250    200200   18.4600  144.7300      16.1       163       193        92
VIS    2025250    200200   18.4600  144.7200      15.8       166       193        92
VIS    2025250    200200   18.4600  144.6900      15.3       172       192        92
VIS    2025250    200200   18.4500  144.6400      14.8       170       192        90
VIS    2025250    200200   18.4600  144.6100      14.3       164       193        94
VIS    2025250    200200   18.4500  144.6000      12.7       160       191        94
VIS    2025250    200200   18.4500  144.5600      12.0       167       192        92
VIS    2025250    200200   18.4400  144.4500      15.7       172       189        92
VIS    2025250    200200   18.4600  144.4100      13.9       176       193        90
VIS    2025250    200200   18.4400  144.3900      15.8       175       192        90
VIS    2025250    200200   18.4400  144.3600      18.9       176       191        90
VIS    2025250    200200   18.4500  144.2900      15.3       176       189        92
VIS    2025250    200200   18.4500  144.2900      15.6       178       189        91
VIS    2025250    200200   18.4800  149.3600       8.1        37       987        97
VIS    2025250    200200   18.4700  149.3400       8.5        32       987        97
VIS    2025250    200200   18.4700  149.3300       8.3        33       987        97
VIS    2025250    200200   18.4700  149.3100       8.4        35       983        98
VIS    2025250    200200   18.4700  149.2600       8.6        38       977        96
VIS    2025250    200200   18.4600  149.2600       8.7        38       968        96
VIS    2025250    200200   18.4700  149.2300       8.9        40       963        97
VIS    2025250    200200   18.4800  149.2100       8.6        41       963        96
VIS    2025250    200200   18.4700  149.1600       8.6        48       979        90
VIS    2025250    200200   18.4800  148.9500      11.2        32       972        91
VIS    2025250    200200   18.4700  148.9200      10.0        35       965        96
VIS    2025250    200200   18.4700  148.9000       9.4        36       946        98
VIS    2025250    200200   18.4600  148.8600       9.3        40       946        92
VIS    2025250    200200   18.4700  148.8500       8.6        36       955        91
VIS    2025250    200200   18.4800  148.8300       8.8        38       963        93
VIS    2025250    200200   18.4700  148.7900       8.9        43       969        94
VIS    2025250    200200   18.4800  148.7800       8.9        41       938        98
VIS    2025250    200200   18.4600  148.7400       9.5        40       891        99
VIS    2025250    200200   18.4600  148.7300       9.4        40       891        99
VIS    2025250    200200   18.4600  148.7000       8.9        37       895        97
VIS    2025250    200200   18.4500  148.6600       9.1        38       918        99
VIS    2025250    200200   18.4500  148.6500       9.3        39       958        97
VIS    2025250    200200   18.4600  148.6300       9.6        37       974        95
VIS    2025250    200200   18.4700  148.6000       9.5        34       981        96
VIS    2025250    200200   18.4700  148.5500      10.0        34       985        93
VIS    2025250    200200   18.4500  148.5100       9.8        33       968        97
VIS    2025250    200200   18.4700  148.5100       9.0        39       968        95
VIS    2025250    200200   18.4500  148.3600      11.4        19       988        91
VIS    2025250    200200   18.4500  148.3200       9.5        39       975        95
VIS    2025250    200200   18.4600  148.2900      10.3        32       969        97
VIS    2025250    200200   18.4700  148.2400      10.4        40       965        96
VIS    2025250    200200   18.4700  148.2200      10.1        40       964        96
VIS    2025250    200200   18.4600  148.1900      10.4        33       943        98
VIS    2025250    200200   18.4500  148.1700      11.1        29       943       100
VIS    2025250    200200   18.4500  148.1500      11.2        32       943        99
VIS    2025250    200200   18.4500  148.1200      10.7        30       967        99
VIS    2025250    200200   18.4500  148.1100      10.6        30       967        99
VIS    2025250    200200   18.4700  148.0700      10.1        29       910        94
VIS    2025250    200200   18.4700  148.0600      10.0        30       910        95
VIS    2025250    200200   18.4500  148.0300       9.8        36       900        97
VIS    2025250    200200   18.4500  148.0000      10.4        35       900        98
VIS    2025250    200200   18.4500  147.9900      10.6        34       900        98
VIS    2025250    200200   18.4600  147.9600      11.1        30       915        98
VIS    2025250    200200   18.4300  145.8700      10.5        90       171        91
VIS    2025250    200200   18.4400  145.8300      10.4        88       170        91
VIS    2025250    200200   18.4300  145.8100      10.4        81       173        92
VIS    2025250    200200   18.4300  145.8000      10.7        78       173        92
VIS    2025250    200200   18.4400  145.7600      11.7        96       176        92
VIS    2025250    200200   18.4400  145.7500      11.3        95       174        93
VIS    2025250    200200   18.4400  145.7300      11.2        85       169        92
VIS    2025250    200200   18.4400  145.6900      12.3        86       168        90
VIS    2025250    200200   18.4400  145.6700      12.1        87       166        90
VIS    2025250    200200   18.4400  145.6400      11.6        85       162        92
VIS    2025250    200200   18.4400  145.6300      11.3        83       162        92
VIS    2025250    200200   18.4300  145.6000      10.2        79       164        90
VIS    2025250    200200   18.4200  145.4000      12.5        92       183        93
VIS    2025250    200200   18.4200  145.3700      13.0       100       185        90
VIS    2025250    200200   18.4200  145.3400      14.5       102       188        95
VIS    2025250    200200   18.4200  145.1800      16.7       127       182        91
VIS    2025250    200200   18.4200  145.1600      17.0       137       180        97
VIS    2025250    200200   18.4200  144.6900      15.9       166       194        95
VIS    2025250    200200   18.4400  144.6800      15.5       169       192        94
VIS    2025250    200200   18.4400  144.6400      14.8       171       192        91
VIS    2025250    200200   18.4200  144.6100      12.8       171       191        92
VIS    2025250    200200   18.4300  144.5900      11.9       157       193        94
VIS    2025250    200200   18.4300  144.5800      11.7       154       193        93
VIS    2025250    200200   18.4200  144.4800      12.4       162       189        93
VIS    2025250    200200   18.4200  144.4500      15.0       176       184        92
VIS    2025250    200200   18.4400  149.2600       8.4        40       968        96
VIS    2025250    200200   18.4400  149.2500       8.6        42       968        95
VIS    2025250    200200   18.4500  149.2200       8.7        42       963        95
VIS    2025250    200200   18.4400  149.2000       8.5        50       951        92
VIS    2025250    200200   18.4500  148.9300       9.5        35       962        97
VIS    2025250    200200   18.4300  148.8900       9.1        34       957        98
VIS    2025250    200200   18.4400  148.8800       9.2        37       957        97
VIS    2025250    200200   18.4500  148.8600       9.5        40       947        93
VIS    2025250    200200   18.4300  148.8200       9.0        45       958        96
VIS    2025250    200200   18.4300  148.7900       9.3        45       946        97
VIS    2025250    200200   18.4500  148.7700       9.8        45       936        97
VIS    2025250    200200   18.4300  148.7500      10.0        41       910        99
VIS    2025250    200200   18.4400  148.7300       9.7        37       895        98
VIS    2025250    200200   18.4500  148.7100       9.0        33       891        96
VIS    2025250    200200   18.4500  148.6900       8.6        35       902        98
VIS    2025250    200200   18.4500  148.6500       9.2        38       949        98
VIS    2025250    200200   18.4300  148.6200       9.7        40       972        96
VIS    2025250    200200   18.4300  148.6100       9.8        40       972        96
VIS    2025250    200200   18.4400  148.5600      10.9        41       968        97
VIS    2025250    200200   18.4300  148.5300      10.6        39       968        97
VIS    2025250    200200   18.4500  148.5100       9.8        34       947        96
VIS    2025250    200200   18.4300  148.4900       9.6        36       925        98
VIS    2025250    200200   18.4300  148.4500       9.9        19       897        91
VIS    2025250    200200   18.4500  148.4000      12.0        20       967        91
VIS    2025250    200200   18.4300  148.3800      11.5        31       956        90
VIS    2025250    200200   18.4300  148.3000       9.1        34       969        98
VIS    2025250    200200   18.4500  148.2700      10.1        33       969        98
VIS    2025250    200200   18.4300  148.2500      10.7        33       979        99
VIS    2025250    200200   18.4300  148.2300      11.5        32       980        99
VIS    2025250    200200   18.4400  148.2200      10.8        33       981        99
VIS    2025250    200200   18.4300  148.1700      10.8        29       941        99
VIS    2025250    200200   18.4200  148.1500      11.0        28       938        99
VIS    2025250    200200   18.4200  148.1200      10.7        27       956        98
VIS    2025250    200200   18.4400  148.0800      10.7        30       948        97
VIS    2025250    200200   18.4300  148.0600      10.6        31       948        97
VIS    2025250    200200   18.4400  148.0300       9.9        35       905        96
VIS    2025250    200200   18.4300  148.0100       9.9        35       900        97
VIS    2025250    200200   18.4300  147.9800      10.5        32       901        97
VIS    2025250    200200   18.4300  147.9700      10.7        30       918        97
VIS    2025250    200200   18.4200  145.8400      10.8        86       171        91
VIS    2025250    200200   18.4200  145.8100      10.7        78       172        92
VIS    2025250    200200   18.4200  145.7200      11.5        84       170        90
VIS    2025250    200200   18.4100  145.7000      11.9        81       170        90
VIS    2025250    200200   18.4100  145.6800      12.9        81       168        92
VIS    2025250    200200   18.4200  145.6600      12.4        85       166        93
VIS    2025250    200200   18.4000  145.6400      11.8        80       167        91
VIS    2025250    200200   18.4000  145.4500       9.3        88       167        90
VIS    2025250    200200   18.4000  145.4100      11.4        91       184        91
VIS    2025250    200200   18.4100  145.3500      13.7       102       187        96
VIS    2025250    200200   18.4100  145.2300      13.7       129       178        90
VIS    2025250    200200   18.4200  145.1900      16.5       127       180        91
VIS    2025250    200200   18.4000  145.1600      17.0       135       171        92
VIS    2025250    200200   18.4000  145.1400      17.2       140       171        91
VIS    2025250    200200   18.4100  145.1300      16.7       146       176        96
VIS    2025250    200200   18.4000  145.1000      17.8       147       173        90
VIS    2025250    200200   18.4100  144.6500      14.5       171       194        92
VIS    2025250    200200   18.4000  144.4600      13.3       172       184        93
VIS    2025250    200200   18.4100  144.4500      14.5       176       184        92
VIS    2025250    200200   18.4300  149.2700       8.2        41       958        94
VIS    2025250    200200   18.4300  149.2600       8.3        40       968        95
VIS    2025250    200200   18.4100  149.2200       9.1        49       966        93
VIS    2025250    200200   18.4300  149.2000       8.6        52       951        91
VIS    2025250    200200   18.4200  149.1900       8.4        51       950        93
VIS    2025250    200200   18.4100  148.9400       8.7        22       995        98
VIS    2025250    200200   18.4100  148.9300       8.7        25       991        96
VIS    2025250    200200   18.4100  148.9000       8.8        28       960        98
VIS    2025250    200200   18.4100  148.8800       9.0        31       960        96
VIS    2025250    200200   18.4100  148.8500       8.9        34       978        96
VIS    2025250    200200   18.4100  148.8100       9.1        42       958        97
VIS    2025250    200200   18.4100  148.7900       9.2        45       946        97
VIS    2025250    200200   18.4100  148.7700       9.2        45       920        98
VIS    2025250    200200   18.4300  148.7500       9.8        42       910        98
VIS    2025250    200200   18.4100  148.7200       8.7        33       885        95
VIS    2025250    200200   18.4300  148.7000       8.9        30       889        94
VIS    2025250    200200   18.4100  148.6600       8.6        35       901        98
VIS    2025250    200200   18.4100  148.6500       8.5        36       942        98
VIS    2025250    200200   18.4100  148.6200       8.7        35       966        96
VIS    2025250    200200   18.4000  148.5900       9.7        38       963        98
VIS    2025250    200200   18.4100  148.5600      10.9        38       965        98
VIS    2025250    200200   18.4100  148.5600      10.8        37       965        98
VIS    2025250    200200   18.4200  148.5100       9.9        36       969        94
VIS    2025250    200200   18.4000  148.5100       9.3        40       954        98
VIS    2025250    200200   18.4200  148.4800       9.5        37       927        99
VIS    2025250    200200   18.4200  148.4400      10.1        19       906        93
VIS    2025250    200200   18.4000  148.4300      10.2        34       922        98
VIS    2025250    200200   18.4100  148.3900      11.4        36       939        98
VIS    2025250    200200   18.4200  148.3800      11.3        33       956        92
VIS    2025250    200200   18.4100  148.3600      10.7        33       959        91
VIS    2025250    200200   18.4000  148.2900       8.7        36       966        96
VIS    2025250    200200   18.4000  148.2800       9.0        37       966        97
VIS    2025250    200200   18.4200  148.2400      11.2        32       979        99
VIS    2025250    200200   18.4000  148.2300      11.7        32       979        99
VIS    2025250    200200   18.4000  148.2100      11.8        32       977        99
VIS    2025250    200200   18.4000  148.1700      11.2        29       945       100
VIS    2025250    200200   18.4100  148.1400      11.6        27       941        99
VIS    2025250    200200   18.4200  148.1300      11.2        27       943        99
VIS    2025250    200200   18.4000  148.1100      13.0        25       956        98
VIS    2025250    200200   18.4200  148.0400      10.7        32       948        99
VIS    2025250    200200   18.4000  148.0300      11.0        31       945       100
VIS    2025250    200200   18.4200  148.0100      10.3        35       902        98
VIS    2025250    200200   18.4200  147.9800      10.3        34       902        97
VIS    2025250    200200   18.4200  147.9500      10.6        26       938        97
VIS    2025250    200200   18.3800  146.0500      10.8        88       183        90
VIS    2025250    200200   18.3900  145.8600      11.4        85       171        90
VIS    2025250    200200   18.3900  145.8500      11.2        84       171        91
VIS    2025250    200200   18.3900  145.8100      10.7        75       173        92
VIS    2025250    200200   18.3800  145.6600      13.5        79       168        92
VIS    2025250    200200   18.4000  145.6400      12.1        78       167        90
VIS    2025250    200200   18.3700  145.4500      10.1        90       175        90
VIS    2025250    200200   18.3800  145.4200      11.0        89       185        90
VIS    2025250    200200   18.3800  145.3800      11.0       106       188        92
VIS    2025250    200200   18.3900  145.3600      12.4       105       187        94
VIS    2025250    200200   18.3800  145.3400      14.2       107       173        90
VIS    2025250    200200   18.3800  145.2800      15.1       110       178        93
VIS    2025250    200200   18.3800  145.2500      14.9       118       177        90
VIS    2025250    200200   18.3900  145.2400      14.3       122       175        91
VIS    2025250    200200   18.3700  145.2200      15.9       123       176        94
VIS    2025250    200200   18.3800  145.1800      16.5       132       169        97
VIS    2025250    200200   18.3900  145.1600      17.0       135       170        96
VIS    2025250    200200   18.3800  145.1300      16.7       144       171        91
VIS    2025250    200200   18.3800  145.1200      17.0       145       172        91
VIS    2025250    200200   18.3800  145.0900      18.1       149       173        90
VIS    2025250    200200   18.3700  145.0500      19.6       152       180        94
VIS    2025250    200200   18.3700  145.0500      19.7       152       182        95
VIS    2025250    200200   18.3800  145.0200      20.1       155       183        94
VIS    2025250    200200   18.3800  145.0000      20.2       155       184        94
VIS    2025250    200200   18.3700  144.9700      21.1       160       184        91
VIS    2025250    200200   18.3800  144.9300      20.9       164       190        91
VIS    2025250    200200   18.3700  144.4900      13.2       172       185        91
VIS    2025250    200200   18.3800  144.2300      15.3       175       196        94
VIS    2025250    200200   18.3900  149.3200       9.0        19       983        97
VIS    2025250    200200   18.4000  149.2800       8.5        37       973        97
VIS    2025250    200200   18.3900  149.2400       8.8        49       952        94
VIS    2025250    200200   18.4000  149.1900       8.6        48       950        94
VIS    2025250    200200   18.4000  149.1900       8.6        47       950        94
VIS    2025250    200200   18.3900  148.9300       8.9        21       991        95
VIS    2025250    200200   18.3900  148.8700       8.7        31       975        95
VIS    2025250    200200   18.3800  148.8300       8.8        34       978        95
VIS    2025250    200200   18.3900  148.8000       8.7        44       946        97
VIS    2025250    200200   18.3800  148.7900       8.7        45       934        98
VIS    2025250    200200   18.4000  148.7600       9.0        44       919        98
VIS    2025250    200200   18.4000  148.7200       8.6        35       880        95
VIS    2025250    200200   18.4000  148.7000       8.6        31       872        92
VIS    2025250    200200   18.3900  148.6500       8.7        33       908        96
VIS    2025250    200200   18.3800  148.6300       8.4        33       942        98
VIS    2025250    200200   18.3800  148.6000       8.8        37       958        97
VIS    2025250    200200   18.3900  148.6000       9.1        37       961        98
VIS    2025250    200200   18.3800  148.5600      10.4        36       948        99
VIS    2025250    200200   18.3900  148.5400      10.1        37       948        99
VIS    2025250    200200   18.3900  148.5200       9.3        40       947        98
VIS    2025250    200200   18.3900  148.4900       9.2        43       938        98
VIS    2025250    200200   18.3900  148.4700       9.3        41       922        99
VIS    2025250    200200   18.3900  148.4400       9.8        38       922       100
VIS    2025250    200200   18.4000  148.4200      10.5        35       924        99
VIS    2025250    200200   18.3800  148.3900      11.0        37       937        99
VIS    2025250    200200   18.3900  148.3200       9.5        30       966        95
VIS    2025250    200200   18.4000  148.2800       8.9        37       966        97
VIS    2025250    200200   18.4000  148.2400      11.1        32       979        98
VIS    2025250    200200   18.3800  148.2100      11.6        32       977        99
VIS    2025250    200200   18.3900  148.1900      11.5        33       968        99
VIS    2025250    200200   18.3800  148.1700      11.5        31       965       100
VIS    2025250    200200   18.3900  148.1500      11.5        30       945        99
VIS    2025250    200200   18.3800  148.1300      12.8        23       956        97
VIS    2025250    200200   18.3800  148.1000      12.8        23       973        97
VIS    2025250    200200   18.3800  148.0700      11.4        35       972        99
VIS    2025250    200200   18.3700  148.0400      10.9        30       958       100
VIS    2025250    200200   18.3900  147.9900      10.5        35       911        98
VIS    2025250    200200   18.3800  147.9600      10.3        30       948        97
VIS    2025250    200200   18.3900  147.9500      10.3        29       948        95
VIS    2025250    200200   18.3600  146.0700      12.8        87       183        93
VIS    2025250    200200   18.3600  146.0500      11.5        85       181        92
VIS    2025250    200200   18.3600  146.0400      10.7        86       180        90
VIS    2025250    200200   18.3700  145.4500       9.6        91       175        90
VIS    2025250    200200   18.3500  145.4100      11.1        94       189        90
VIS    2025250    200200   18.3500  145.3900      11.6        94       188        90
VIS    2025250    200200   18.3700  145.3800      11.0       102       188        92
VIS    2025250    200200   18.3700  145.3300      14.8       107       168        94
VIS    2025250    200200   18.3600  145.2900      16.1       102       180        99
VIS    2025250    200200   18.3500  145.2800      16.3        99       181        99
VIS    2025250    200200   18.3600  145.2600      15.5       110       180        97
VIS    2025250    200200   18.3500  145.2200      16.4       119       177        92
VIS    2025250    200200   18.3500  145.1900      16.1       130       171        98
VIS    2025250    200200   18.3500  145.1700      16.3       135       169        99
VIS    2025250    200200   18.3600  145.1400      16.7       143       170        96
VIS    2025250    200200   18.3500  145.1400      17.0       144       169        95
VIS    2025250    200200   18.3500  145.1100      16.9       148       173        93
VIS    2025250    200200   18.3500  145.0700      19.2       152       173        92
VIS    2025250    200200   18.3500  145.0600      19.3       153       174        92
VIS    2025250    200200   18.3700  145.0400      19.9       154       182        94
VIS    2025250    200200   18.3500  144.9900      20.7       160       182        91
VIS    2025250    200200   18.3500  144.9800      20.6       161       182        91
VIS    2025250    200200   18.3500  144.9500      21.0       162       184        91
VIS    2025250    200200   18.3500  144.9400      20.9       163       184        90
VIS    2025250    200200   18.3600  144.4900      11.5       171       186        91
VIS    2025250    200200   18.3500  144.4800      11.6       170       186        92
VIS    2025250    200200   18.3800  149.3300       8.7        21       983        97
VIS    2025250    200200   18.3800  149.3100       8.7        24       983        99
VIS    2025250    200200   18.3600  149.2700       8.2        40       952        93
VIS    2025250    200200   18.3700  149.2700       8.3        41       952        94
VIS    2025250    200200   18.3700  149.2300       8.3        46       947        96
VIS    2025250    200200   18.3800  149.2000       8.6        47       961        92
VIS    2025250    200200   18.3800  149.1900       8.6        46       964        92
VIS    2025250    200200   18.3700  148.8900       9.1        25       977        96
VIS    2025250    200200   18.3700  148.8600       8.7        30       975        98
VIS    2025250    200200   18.3800  148.8300       8.8        37       978        95
VIS    2025250    200200   18.3800  148.7900       8.6        47       934        96
VIS    2025250    200200   18.3600  148.7600       8.7        37       934       100
VIS    2025250    200200   18.3800  148.7600       8.5        38       919        99
VIS    2025250    200200   18.3700  148.7200       8.2        34       878        93
VIS    2025250    200200   18.3800  148.6700       8.6        29       874        91
VIS    2025250    200200   18.3600  148.6400       8.5        33       908        96
VIS    2025250    200200   18.3700  148.6100       8.4        35       954        97
VIS    2025250    200200   18.3700  148.6000       8.6        37       954        96
VIS    2025250    200200   18.3600  148.5600       9.8        37       942        99
VIS    2025250    200200   18.3600  148.5500      10.1        35       924       100
VIS    2025250    200200   18.3500  148.5200      10.1        38       920       100
VIS    2025250    200200   18.3700  148.5000       9.4        40       931        99
VIS    2025250    200200   18.3500  148.4800       9.9        35       922       100
VIS    2025250    200200   18.3600  148.4500      10.6        41       927        99
VIS    2025250    200200   18.3500  148.4100      11.1        41       929        99
VIS    2025250    200200   18.3700  148.3900      11.0        38       937        99
VIS    2025250    200200   18.3700  148.3900      10.9        37       938        99
VIS    2025250    200200   18.3600  148.3400       9.7        31       963        97
VIS    2025250    200200   18.3500  148.3400       9.8        32       963        99
VIS    2025250    200200   18.3500  148.2900      10.3        37       968        98
VIS    2025250    200200   18.3600  148.2700       9.6        39       966        97
VIS    2025250    200200   18.3500  148.2600       9.6        39       964        98
VIS    2025250    200200   18.3700  148.1900      11.5        32       971        99
VIS    2025250    200200   18.3600  148.1900      11.4        31       971        99
VIS    2025250    200200   18.3600  148.1600      11.6        30       956        99
VIS    2025250    200200   18.3600  148.1300      11.6        32       916        99
VIS    2025250    200200   18.3500  148.1000      11.3        32       925        99
VIS    2025250    200200   18.3500  148.0700      10.7        32       938        99
VIS    2025250    200200   18.3500  148.0500      10.4        30       938        98
VIS    2025250    200200   18.3700  148.0200      10.4        33       923        98
VIS    2025250    200200   18.3700  148.0000      10.2        33       928        98
VIS    2025250    200200   18.3600  147.9900      10.1        33       930        98
VIS    2025250    200200   18.3500  147.9600       9.8        24       959        98
VIS    2025250    200200   18.3600  147.9400      10.2        28       953        99
VIS    2025250    200200   18.3500  147.9100      10.3        28       918        97
VIS    2025250    200200   18.3500  146.0600      11.7        85       181        92
VIS    2025250    200200   18.3400  146.0500      11.1        82       180        91
VIS    2025250    200200   18.3300  145.9800      11.9        81       171        94
VIS    2025250    200200   18.3500  145.9100      11.6        62       170        90
VIS    2025250    200200   18.3400  145.3600      12.0       103       173        90
VIS    2025250    200200   18.3400  145.3400      13.5       107       173        91
VIS    2025250    200200   18.3400  145.3000      17.3        98       183        99
VIS    2025250    200200   18.3400  145.2800      15.9        99       183        99
VIS    2025250    200200   18.3400  145.2500      15.5       109       182        97
VIS    2025250    200200   18.3400  145.2500      15.8       111       181        96
VIS    2025250    200200   18.3400  145.2200      16.5       117       180        91
VIS    2025250    200200   18.3400  145.1800      16.4       135       169        99
VIS    2025250    200200   18.3300  145.1700      16.4       137       169        99
VIS    2025250    200200   18.3400  145.1400      16.7       145       166        94
VIS    2025250    200200   18.3300  145.1200      16.4       148       165        93
VIS    2025250    200200   18.3400  145.0600      19.1       154       173        91
VIS    2025250    200200   18.3400  145.0400      19.6       155       179        93
VIS    2025250    200200   18.3200  145.0200      19.0       158       178        93
VIS    2025250    200200   18.3400  144.9800      20.6       161       183        91
VIS    2025250    200200   18.3400  144.9800      20.7       161       183        91
VIS    2025250    200200   18.3400  144.9400      20.3       163       186        92
VIS    2025250    200200   18.3300  144.9300      19.2       166       188        92
VIS    2025250    200200   18.3300  144.8600      17.5       166       186        92
VIS    2025250    200200   18.3300  144.4900      11.5       161       194        91
VIS    2025250    200200   18.3700  150.9300       7.2        55       988        93
VIS    2025250    200200   18.3500  150.4700       7.5        28       972        93
VIS    2025250    200200   18.3500  150.4700       7.2        32       972        91
VIS    2025250    200200   18.3500  149.3000       8.2        32       983        98
VIS    2025250    200200   18.3400  149.2800       8.1        38       952        95
VIS    2025250    200200   18.3400  149.2700       8.2        38       948        94
VIS    2025250    200200   18.3300  148.9500      10.0        41       997        93
VIS    2025250    200200   18.3400  148.8900       9.4        25       980        94
VIS    2025250    200200   18.3500  148.8600       8.9        28       978        95
VIS    2025250    200200   18.3500  148.8500       8.9        29       978        94
VIS    2025250    200200   18.3500  148.7900       8.7        47       958        94
VIS    2025250    200200   18.3400  148.7800       9.1        45       955        96
VIS    2025250    200200   18.3500  148.7600       8.9        36       934       100
VIS    2025250    200200   18.3500  148.7200       8.7        36       909        97
VIS    2025250    200200   18.3300  148.7000       8.5        34       906        90
VIS    2025250    200200   18.3500  148.6400       8.5        35       892        96
VIS    2025250    200200   18.3500  148.6200       8.5        40       922        98
VIS    2025250    200200   18.3500  148.6000       8.9        39       952        97
VIS    2025250    200200   18.3400  148.5900       9.1        34       952        96
VIS    2025250    200200   18.3400  148.5600       9.4        30       942        91
VIS    2025250    200200   18.3500  148.5400      10.2        34       920        99
VIS    2025250    200200   18.3300  148.5100      10.6        34       917        99
VIS    2025250    200200   18.3400  148.4700       9.9        34       927       100
VIS    2025250    200200   18.3400  148.4500      10.0        38       927       100
VIS    2025250    200200   18.3300  148.4300      10.5        42       925        99
VIS    2025250    200200   18.3500  148.4100      11.1        41       929        99
VIS    2025250    200200   18.3400  148.3900      10.9        39       931        99
VIS    2025250    200200   18.3300  148.3400      10.2        33       951       100
VIS    2025250    200200   18.3300  148.3400      10.1        32       951       100
VIS    2025250    200200   18.3300  148.3100      10.5        32       959       100
VIS    2025250    200200   18.3300  148.2900      10.5        37       959        99
VIS    2025250    200200   18.3500  148.2600       9.5        40       960        97
VIS    2025250    200200   18.3300  148.1600      10.8        30       971        99
VIS    2025250    200200   18.3300  148.1300      10.9        32       923        98
VIS    2025250    200200   18.3400  148.1000      11.1        32       923        98
VIS    2025250    200200   18.3400  148.0700      10.5        31       925        98
VIS    2025250    200200   18.3400  148.0600      10.4        31       938        98
VIS    2025250    200200   18.3400  148.0400      10.5        29       938        99
VIS    2025250    200200   18.3200  148.0000      10.4        30       948        99
VIS    2025250    200200   18.3300  147.9500       9.8        20       959        97
VIS    2025250    200200   18.3200  146.0600      10.3        80       181        91
VIS    2025250    200200   18.3100  146.0400       9.9        80       175        91
VIS    2025250    200200   18.3000  146.0000      10.3        85       172        91
VIS    2025250    200200   18.3000  145.9800      11.2        81       171        93
VIS    2025250    200200   18.3100  145.3100      16.3       106       183        99
VIS    2025250    200200   18.3100  145.3000      15.8       105       183        99
VIS    2025250    200200   18.3000  145.2500      13.7       119       182        91
VIS    2025250    200200   18.3000  145.2500      14.3       115       182        94
VIS    2025250    200200   18.3100  145.2200      16.4       114       170        90
VIS    2025250    200200   18.3100  145.2000      15.8       123       169        96
VIS    2025250    200200   18.3200  145.1600      15.6       139       166        99
VIS    2025250    200200   18.3000  145.1400      14.5       140       164        98
VIS    2025250    200200   18.3200  145.1200      16.2       148       163        91
VIS    2025250    200200   18.3200  145.0200      18.6       157       178        93
VIS    2025250    200200   18.3000  144.9900      19.2       159       183        92
VIS    2025250    200200   18.3000  144.9600      19.1       161       185        93
VIS    2025250    200200   18.3100  144.9500      19.1       163       188        93
VIS    2025250    200200   18.3000  144.9300      18.0       166       189        93
VIS    2025250    200200   18.3100  144.8700      17.5       169       182        90
VIS    2025250    200200   18.3100  144.8600      17.2       168       184        90
VIS    2025250    200200   18.2900  144.8100      17.3       166       188        93
VIS    2025250    200200   18.3500  150.9500       7.0        54       962        92
VIS    2025250    200200   18.3500  150.9400       7.0        55       986        95
VIS    2025250    200200   18.3100  149.3100       8.6        28       975        94
VIS    2025250    200200   18.3300  149.2700       8.1        39       959        96
VIS    2025250    200200   18.3200  148.9300      10.4        36       997        95
VIS    2025250    200200   18.3100  148.9100      10.3        35       989        96
VIS    2025250    200200   18.3200  148.8900       9.5        29       976        96
VIS    2025250    200200   18.3300  148.8600       9.1        32       981        95
VIS    2025250    200200   18.3100  148.8200       9.7        45       956        95
VIS    2025250    200200   18.3100  148.8200       9.8        44       956        95
VIS    2025250    200200   18.3100  148.7800      10.1        43       956        96
VIS    2025250    200200   18.3100  148.7500       9.7        40       956        98
VIS    2025250    200200   18.3300  148.7400       9.5        40       955        97
VIS    2025250    200200   18.3100  148.7100       9.4        34       925        98
VIS    2025250    200200   18.3200  148.6500       8.5        38       889        94
VIS    2025250    200200   18.3300  148.6200       8.8        38       908        99
VIS    2025250    200200   18.3200  148.6000       8.9        40       937        97
VIS    2025250    200200   18.3100  148.5800       8.5        41       937        91
VIS    2025250    200200   18.3100  148.5500       8.8        31       956        91
VIS    2025250    200200   18.3300  148.5500       9.2        31       918        90
VIS    2025250    200200   18.3200  148.5100      10.6        33       917        99
VIS    2025250    200200   18.3100  148.4800       9.8        33       918        99
VIS    2025250    200200   18.3100  148.4700       9.3        35       920        99
VIS    2025250    200200   18.3200  148.4500       9.6        37       925       100
VIS    2025250    200200   18.3100  148.4100      10.4        38       925       100
VIS    2025250    200200   18.3200  148.3800      10.6        40       931        99
VIS    2025250    200200   18.3100  148.3600      10.4        38       938        99
VIS    2025250    200200   18.3200  148.3400      10.0        34       951       100
VIS    2025250    200200   18.3100  148.3100      10.3        34       951       100
VIS    2025250    200200   18.3100  148.2900      10.3        36       947       100
VIS    2025250    200200   18.3100  148.2700      10.0        36       945       100
VIS    2025250    200200   18.3200  148.1200      10.4        34       923        96
VIS    2025250    200200   18.3000  148.0800       9.8        35       920        96
VIS    2025250    200200   18.3100  148.0600       9.7        32       920        95
VIS    2025250    200200   18.3100  148.0500       9.6        33       920        95
VIS    2025250    200200   18.3200  147.9600       9.7        17       977        96
VIS    2025250    200200   18.3100  147.6100      10.5        40       764        92
VIS    2025250    200200   18.3000  145.9900      10.7        82       172        92
VIS    2025250    200200   18.2800  145.9600      10.7        73       172        90
VIS    2025250    200200   18.2900  145.3200      15.2       109       185        95
VIS    2025250    200200   18.2900  145.2900      13.8       120       184        92
VIS    2025250    200200   18.2900  145.2700      13.6       119       184        93
VIS    2025250    200200   18.2900  145.2600      13.6       119       183        92
VIS    2025250    200200   18.2800  145.2200      11.8       125       183        90
VIS    2025250    200200   18.2900  145.2000      13.8       122       170        95
VIS    2025250    200200   18.2900  145.1800      14.1       127       169        98
VIS    2025250    200200   18.2800  145.1500      13.4       134       164        98
VIS    2025250    200200   18.2800  145.1400      13.4       137       163        98
VIS    2025250    200200   18.2700  145.1000      12.9       149       159        90
VIS    2025250    200200   18.2900  145.0300      17.4       157       166        90
VIS    2025250    200200   18.2800  145.0100      18.9       155       172        91
VIS    2025250    200200   18.2800  144.9900      19.0       157       178        92
VIS    2025250    200200   18.2800  144.9500      19.0       163       185        92
VIS    2025250    200200   18.2700  144.8100      16.8       169       186        91
VIS    2025250    200200   18.2800  144.7900      16.6       168       188        92
VIS    2025250    200200   18.2700  144.7400      16.4       174       188        93
VIS    2025250    200200   18.2900  149.3000       8.9        36       982        96
VIS    2025250    200200   18.2900  149.2700       9.0        40       969        95
VIS    2025250    200200   18.2900  148.9400       9.9        32       988        96
VIS    2025250    200200   18.3000  148.9000      10.3        36       988        96
VIS    2025250    200200   18.2900  148.8800       9.6        35       957        98
VIS    2025250    200200   18.2900  148.8500       8.9        42       954        93
VIS    2025250    200200   18.3000  148.8300       9.2        47       954        94
VIS    2025250    200200   18.2900  148.8100       9.7        44       939        98
VIS    2025250    200200   18.2900  148.7800      10.1        42       956        96
VIS    2025250    200200   18.3000  148.7600       9.9        38       958        97
VIS    2025250    200200   18.2900  148.7300       9.2        29       972        99
VIS    2025250    200200   18.2800  148.7100       8.7        35       929        99
VIS    2025250    200200   18.3000  148.6400       8.9        36       892        97
VIS    2025250    200200   18.2800  148.6100       8.8        41       908        99
VIS    2025250    200200   18.3000  148.5800       8.3        45       937        91
VIS    2025250    200200   18.2800  148.5700       8.1        42       948        94
VIS    2025250    200200   18.2900  148.5300       8.7        35       922        98
VIS    2025250    200200   18.2900  148.5200       9.7        31       913        96
VIS    2025250    200200   18.3000  148.4900      10.1        35       917        99
VIS    2025250    200200   18.2800  148.4600       9.3        35       920        99
VIS    2025250    200200   18.2900  148.4500       9.4        34       924        99
VIS    2025250    200200   18.3000  148.3900      10.6        37       934        99
VIS    2025250    200200   18.3000  148.3700      10.2        38       938        99
VIS    2025250    200200   18.3000  148.3300       9.3        36       942        98
VIS    2025250    200200   18.3000  148.3300       9.3        35       942        98
VIS    2025250    200200   18.2800  148.2900       9.9        32       935        96
VIS    2025250    200200   18.2900  148.2700      10.1        29       937        95
VIS    2025250    200200   18.2800  148.2300      10.1        29       952        98
VIS    2025250    200200   18.3000  148.1100       9.9        37       946        96
VIS    2025250    200200   18.2800  148.0900       9.2        37       941        96
VIS    2025250    200200   18.2900  148.0600       9.4        35       918        96
VIS    2025250    200200   18.2900  148.0500       9.3        36       918        96
VIS    2025250    200200   18.2800  148.0200       9.9        43       890        97
VIS    2025250    200200   18.2600  145.9100      10.7        65       171        90
VIS    2025250    200200   18.2700  145.9000      11.1        64       171        91
VIS    2025250    200200   18.2500  145.1900      11.2       136       180        90
VIS    2025250    200200   18.2500  145.1500      12.3       132       163        96
VIS    2025250    200200   18.2600  145.1200      12.8       141       162        97
VIS    2025250    200200   18.2600  145.1200      12.5       143       161        96
VIS    2025250    200200   18.2600  144.9700      19.1       159       176        91
VIS    2025250    200200   18.2500  144.9500      18.6       162       176        90
VIS    2025250    200200   18.2600  144.9400      18.8       165       185        92
VIS    2025250    200200   18.2500  144.9200      19.2       170       189        90
VIS    2025250    200200   18.2700  144.8000      16.6       169       186        91
VIS    2025250    200200   18.2600  144.7400      16.3       174       188        93
VIS    2025250    200200   18.2400  144.7100      16.4       175       184        92
VIS    2025250    200200   18.2800  149.2700       9.1        38       959        96
VIS    2025250    200200   18.2600  148.9700      10.0        37       995        93
VIS    2025250    200200   18.2800  148.9400      10.0        29       988        91
VIS    2025250    200200   18.2700  148.9000       9.9        33       961        95
VIS    2025250    200200   18.2600  148.8600       9.3        37       932        97
VIS    2025250    200200   18.2600  148.8500       9.4        37       928        97
VIS    2025250    200200   18.2700  148.8000       9.9        38       939        99
VIS    2025250    200200   18.2700  148.7700       9.9        37       956        98
VIS    2025250    200200   18.2700  148.7500       9.8        29       978        99
VIS    2025250    200200   18.2600  148.7100       8.8        33       969        98
VIS    2025250    200200   18.2600  148.6900       7.8        44       904        96
VIS    2025250    200200   18.2600  148.6700       8.0        42       892        93
VIS    2025250    200200   18.2600  148.6300       8.8        40       897        99
VIS    2025250    200200   18.2600  148.6100       8.9        42       908        99
VIS    2025250    200200   18.2600  148.5900       9.1        39       908        99
VIS    2025250    200200   18.2600  148.5700       8.8        36       932        96
VIS    2025250    200200   18.2600  148.5400       9.2        32       955        95
VIS    2025250    200200   18.2600  148.5300       9.6        31       935        98
VIS    2025250    200200   18.2600  148.5000       9.5        37       924       100
VIS    2025250    200200   18.2700  148.4600       9.1        38       927        99
VIS    2025250    200200   18.2600  148.4400       9.5        37       935        99
VIS    2025250    200200   18.2700  148.4300       9.9        33       935        98
VIS    2025250    200200   18.2600  148.3900      11.3        34       959        98
VIS    2025250    200200   18.2500  148.3800      11.6        35       959        98
VIS    2025250    200200   18.2600  148.3400      10.1        40       963        98
VIS    2025250    200200   18.2600  148.3200       8.9        40       945        98
VIS    2025250    200200   18.2600  148.3000       9.5        36       937        98
VIS    2025250    200200   18.2600  148.2600      10.4        26       934        96
VIS    2025250    200200   18.2500  148.2600      10.4        25       934        96
VIS    2025250    200200   18.2700  148.0900       9.3        38       941        96
VIS    2025250    200200   18.2700  148.0800       9.1        37       920        95
VIS    2025250    200200   18.2700  148.0500       9.1        38       890        94
VIS    2025250    200200   18.2700  148.0300       9.4        41       874        98
VIS    2025250    200200   18.2500  145.8400       8.9        77       173        90
VIS    2025250    200200   18.2300  145.7600      12.3        58       182        90
VIS    2025250    200200   18.2300  145.7500      13.0        52       181        95
VIS    2025250    200200   18.2200  145.1900      11.0       156       188        97
VIS    2025250    200200   18.2300  145.1500      12.0       132       163        96
VIS    2025250    200200   18.2300  145.1300      11.9       143       162        94
VIS    2025250    200200   18.2200  145.1100      11.6       151       163        92
VIS    2025250    200200   18.2300  145.1000      11.8       153       162        91
VIS    2025250    200200   18.2400  144.9600      18.2       161       175        91
VIS    2025250    200200   18.2300  144.7300      16.7       177       184        98
VIS    2025250    200200   18.2400  144.7000      16.2       176       186        97
VIS    2025250    200200   18.2400  149.2900       9.1        21       972        98
VIS    2025250    200200   18.2600  148.9400      10.0        30       998        97
VIS    2025250    200200   18.2400  148.9200       9.8        33       998        94
VIS    2025250    200200   18.2600  148.8900      10.0        33       957        96
VIS    2025250    200200   18.2500  148.8600       9.7        38       932        98
VIS    2025250    200200   18.2500  148.8500       9.5        37       925        97
VIS    2025250    200200   18.2300  148.7600       9.6        40       957        95
VIS    2025250    200200   18.2400  148.7400       9.6        35       978        95
VIS    2025250    200200   18.2500  148.6800       7.8        46       904        94
VIS    2025250    200200   18.2400  148.6600       8.2        42       894        98
VIS    2025250    200200   18.2400  148.6300       8.9        40       892        99
VIS    2025250    200200   18.2400  148.6300       9.1        39       892        99
VIS    2025250    200200   18.2400  148.5900       9.7        34       908        98
VIS    2025250    200200   18.2400  148.5700      10.0        30       919        99
VIS    2025250    200200   18.2400  148.5400       9.5        30       955        98
VIS    2025250    200200   18.2300  148.5200       9.6        34       932        99
VIS    2025250    200200   18.2300  148.5000       9.8        35       935        98
VIS    2025250    200200   18.2300  148.4600       9.1        35       943        97
VIS    2025250    200200   18.2500  148.4500       9.1        38       935        99
VIS    2025250    200200   18.2300  148.4200       9.5        40       953        94
VIS    2025250    200200   18.2300  148.4000       9.7        39       953        94
VIS    2025250    200200   18.2400  148.3600      11.3        36       970        98
VIS    2025250    200200   18.2300  148.3400      11.4        35       954        99
VIS    2025250    200200   18.2500  148.3100       9.3        37       945        98
VIS    2025250    200200   18.2400  148.3000       9.7        30       940        98
VIS    2025250    200200   18.2400  148.2800      10.2        23       937        98
VIS    2025250    200200   18.2300  148.2400      10.3        26       935        97
VIS    2025250    200200   18.2300  148.2300      10.3        27       935        97
VIS    2025250    200200   18.2300  148.1900      10.1        34       963        92
VIS    2025250    200200   18.2300  148.1800      10.0        34       963        91
VIS    2025250    200200   18.2200  145.7700      12.2        59       181        92
VIS    2025250    200200   18.2100  145.7500      12.6        52       181        95
VIS    2025250    200200   18.2100  145.1500      13.7       141       163        95
VIS    2025250    200200   18.2000  145.1400      13.2       147       171        91
VIS    2025250    200200   18.2100  145.1000      11.6       152       163        90
VIS    2025250    200200   18.2100  144.7100      16.1       176       185        97
VIS    2025250    200200   18.2200  144.7100      16.1       177       184        97
VIS    2025250    200200   18.2300  150.5000       7.6        27       991        97
VIS    2025250    200200   18.2200  149.2700       8.8        22       971        98
VIS    2025250    200200   18.2200  148.9800      10.0        37       980        93
VIS    2025250    200200   18.2100  148.9400       9.6        30       983        93
VIS    2025250    200200   18.2100  148.9200       9.8        31       977        95
VIS    2025250    200200   18.2200  148.8900      10.3        35       949        97
VIS    2025250    200200   18.2300  148.8700      10.4        39       933        96
VIS    2025250    200200   18.2200  148.8400       9.8        42       915        98
VIS    2025250    200200   18.2100  148.8100       9.2        37       927        98
VIS    2025250    200200   18.2100  148.8100       9.3        37       933        97
VIS    2025250    200200   18.2200  148.7700       9.7        40       950        95
VIS    2025250    200200   18.2300  148.7600       9.6        40       957        95
VIS    2025250    200200   18.2200  148.7200       9.1        35       999        91
VIS    2025250    200200   18.2100  148.6900       8.9        37       981        92
VIS    2025250    200200   18.2200  148.6300       9.1        37       883        99
VIS    2025250    200200   18.2100  148.5900       9.8        35       870        97
VIS    2025250    200200   18.2200  148.5800      10.0        33       872        97
VIS    2025250    200200   18.2300  148.5600       9.8        31       925        98
VIS    2025250    200200   18.2100  148.5300       9.3        32       932        97
VIS    2025250    200200   18.2200  148.4900       9.7        32       932        98
VIS    2025250    200200   18.2200  148.4800       9.6        32       938        98
VIS    2025250    200200   18.2100  148.4600      10.0        29       954        98
VIS    2025250    200200   18.2300  148.4200       9.4        40       953        94
VIS    2025250    200200   18.2200  148.4100       9.4        40       954        94
VIS    2025250    200200   18.2100  148.3900       9.4        38       953        95
VIS    2025250    200200   18.2200  148.3600      11.7        35       950        95
VIS    2025250    200200   18.2200  148.3300      11.1        31       947        98
VIS    2025250    200200   18.2200  148.3200      10.2        27       943        99
VIS    2025250    200200   18.2100  148.2800      10.4        23       944       100
VIS    2025250    200200   18.2200  148.2600      10.6        24       942       100
VIS    2025250    200200   18.2200  148.2300      10.5        28       935        98
VIS    2025250    200200   18.2100  148.2000      10.6        32       916        98
VIS    2025250    200200   18.2200  148.1900      10.4        34       963        92
VIS    2025250    200200   18.2100  148.1700      10.3        33       979        94
VIS    2025250    200200   18.1900  145.8100      10.4        59       170        91
VIS    2025250    200200   18.2000  145.7700      11.9        57       179        91
VIS    2025250    200200   18.1700  145.1400      15.5       153       180        91
VIS    2025250    200200   18.1800  145.1300      12.8       150       175        92
VIS    2025250    200200   18.1800  145.1100      12.1       156       172        91
VIS    2025250    200200   18.1700  144.7200      14.3       177       190        95
VIS    2025250    200200   18.1700  144.7200      14.0       177       190        95
VIS    2025250    200200   18.2100  150.4800       7.7        33       991        97
VIS    2025250    200200   18.1900  148.9800      10.3        40       980        90
VIS    2025250    200200   18.1900  148.9500       9.8        30       964        92
VIS    2025250    200200   18.1900  148.9300       9.5        28       960        94
VIS    2025250    200200   18.1900  148.9200       9.6        29       956        98
VIS    2025250    200200   18.2000  148.8800      10.2        35       931        96
VIS    2025250    200200   18.1900  148.8700      10.0        35       922        97
VIS    2025250    200200   18.1900  148.8400       9.6        37       915        99
VIS    2025250    200200   18.2000  148.8100       9.2        36       927        99
VIS    2025250    200200   18.1800  148.7800      10.2        35       937        96
VIS    2025250    200200   18.2000  148.7500       9.7        38       947        96
VIS    2025250    200200   18.1900  148.7300       9.5        37       959        95
VIS    2025250    200200   18.1900  148.7100       9.3        39       971        94
VIS    2025250    200200   18.1800  148.6900       8.8        43       980        92
VIS    2025250    200200   18.1900  148.6500       8.9        39       980        90
VIS    2025250    200200   18.1800  148.6400       8.8        37       980        94
VIS    2025250    200200   18.1900  148.6000       8.9        36       952        96
VIS    2025250    200200   18.1900  148.5800       9.2        35       872        98
VIS    2025250    200200   18.1900  148.5700       9.4        33       875        98
VIS    2025250    200200   18.1800  148.5300       9.8        26       938        99
VIS    2025250    200200   18.1800  148.5200       9.9        26       938        99
VIS    2025250    200200   18.2000  148.4800       9.8        31       929        98
VIS    2025250    200200   18.2000  148.4700      10.1        30       947        98
VIS    2025250    200200   18.1900  148.4500      10.4        31       954        98
VIS    2025250    200200   18.1800  148.4300      10.4        34       965        97
VIS    2025250    200200   18.2000  148.3800       9.4        37       950        96
VIS    2025250    200200   18.1800  148.3600      10.9        36       949        96
VIS    2025250    200200   18.1900  148.3500      11.4        36       942        96
VIS    2025250    200200   18.1800  148.3200      11.0        36       940        96
VIS    2025250    200200   18.1800  148.2900      10.5        35       944        97
VIS    2025250    200200   18.2000  148.2600      10.8        23       944        99
VIS    2025250    200200   18.2000  148.2400      11.0        22       938        98
VIS    2025250    200200   18.1900  148.2300      11.0        25       927        97
VIS    2025250    200200   18.2000  148.2000      10.6        31       856        98
VIS    2025250    200200   18.1800  148.1600       9.8        31       943        96
VIS    2025250    200200   18.1800  148.1500       9.8        31       939        97
VIS    2025250    200200   18.1900  147.8900      10.1        27       888        98
VIS    2025250    200200   18.1800  147.8800      10.1        23       888        98
VIS    2025250    200200   18.1700  145.7900       9.2        53       176        91
VIS    2025250    200200   18.1700  144.7200      14.0       178       190        94
VIS    2025250    200200   18.1600  148.9800      10.7        38       961        92
VIS    2025250    200200   18.1600  148.9500      10.4        29       952        95
VIS    2025250    200200   18.1600  148.9300       9.7        26       949        98
VIS    2025250    200200   18.1700  148.8900       9.6        30       943        94
VIS    2025250    200200   18.1700  148.8700       9.8        33       925        95
VIS    2025250    200200   18.1700  148.8600       9.8        33       925        95
VIS    2025250    200200   18.1800  148.8400       9.5        36       915        99
VIS    2025250    200200   18.1700  148.8000      10.3        34       923        96
VIS    2025250    200200   18.1600  148.7800      11.4        36       927        95
VIS    2025250    200200   18.1600  148.7500      10.3        40       944        95
VIS    2025250    200200   18.1600  148.7400       9.8        41       950        94
VIS    2025250    200200   18.1700  148.7000       8.9        44       977        92
VIS    2025250    200200   18.1700  148.6900       8.8        45       978        92
VIS    2025250    200200   18.1700  148.6500       9.0        40       978        94
VIS    2025250    200200   18.1800  148.6300       8.7        39       968        94
VIS    2025250    200200   18.1600  148.5500       9.7        27       942        99
VIS    2025250    200200   18.1800  148.5300      10.0        25       938        99
VIS    2025250    200200   18.1800  148.5200      10.0        25       938        99
VIS    2025250    200200   18.1600  148.4700      10.2        29       938        97
VIS    2025250    200200   18.1800  148.4500      10.4        31       932        99
VIS    2025250    200200   18.1800  148.4300      10.3        34       952        97
VIS    2025250    200200   18.1600  148.4000       9.9        36       952        96
VIS    2025250    200200   18.1600  148.3900       9.8        36       952        96
VIS    2025250    200200   18.1800  148.3600      11.0        37       950        95
VIS    2025250    200200   18.1600  148.3400      11.4        38       947        95
VIS    2025250    200200   18.1600  148.3100      10.7        37       944        96
VIS    2025250    200200   18.1700  148.3000      10.6        37       944        96
VIS    2025250    200200   18.1500  148.2600       9.7        33       945        98
VIS    2025250    200200   18.1500  148.2400       9.4        33       943        96
VIS    2025250    200200   18.1700  148.2000      10.6        31       851        99
VIS    2025250    200200   18.1700  148.1800      10.4        27       922        97
VIS    2025250    200200   18.1500  148.1500       9.8        28       935        98
VIS    2025250    200200   18.1700  148.1500       9.9        30       935        97
VIS    2025250    200200   18.1600  148.1000      10.7        26       979        94
VIS    2025250    200200   18.1600  147.8800      10.2        19       888        91
VIS    2025250    200200   18.1700  147.8700      10.2        19       888        96
VIS    2025250    200200   18.1400  145.7900       8.7        49       176        90
VIS    2025250    200200   18.1600  148.9700      10.6        37       961        93
VIS    2025250    200200   18.1400  148.9500      10.0        30       952        98
VIS    2025250    200200   18.1500  148.9400       9.9        27       949        98
VIS    2025250    200200   18.1600  148.9200       9.6        27       944        98
VIS    2025250    200200   18.1600  148.8900       9.8        32       942        94
VIS    2025250    200200   18.1400  148.8500      10.1        37       924        98
VIS    2025250    200200   18.1500  148.8300       9.5        38       912        96
VIS    2025250    200200   18.1500  148.8100      10.4        38       910        96
VIS    2025250    200200   18.1500  148.7800      11.8        36       921        94
VIS    2025250    200200   18.1500  148.7600      11.7        37       923        94
VIS    2025250    200200   18.1500  148.7300       9.9        41       944        94
VIS    2025250    200200   18.1500  148.7200       9.3        43       950        93
VIS    2025250    200200   18.1400  148.6800       8.2        47       978        91
VIS    2025250    200200   18.1400  148.6600       8.1        45       978        91
VIS    2025250    200200   18.1400  148.6400       8.6        42       965        93
VIS    2025250    200200   18.1500  148.5800       9.2        34       952        95
VIS    2025250    200200   18.1500  148.5500       9.9        26       948        99
VIS    2025250    200200   18.1400  148.5200      10.2        24       964        97
VIS    2025250    200200   18.1400  148.5000      10.0        24       956        97
VIS    2025250    200200   18.1500  148.4500      10.0        29       938        98
VIS    2025250    200200   18.1300  148.4300       9.4        30       943        98
VIS    2025250    200200   18.1500  148.4000       9.6        35       945        97
VIS    2025250    200200   18.1300  148.3900       9.9        32       948        98
VIS    2025250    200200   18.1500  148.3500      11.4        37       954        95
VIS    2025250    200200   18.1500  148.3500      11.3        37       954        95
VIS    2025250    200200   18.1500  148.3200      10.3        38       947        95
VIS    2025250    200200   18.1400  148.2900       9.8        31       953        98
VIS    2025250    200200   18.1300  148.2600       9.8        32       956        98
VIS    2025250    200200   18.1300  148.2500       9.4        35       954        96
VIS    2025250    200200   18.1400  148.2200       9.5        32       930        96
VIS    2025250    200200   18.1500  148.1800       9.7        28       897        96
VIS    2025250    200200   18.1300  148.1700      10.2        26       907        99
VIS    2025250    200200   18.1500  148.1500       9.9        28       923        98
VIS    2025250    200200   18.1400  148.0900      10.2        21       991        98
VIS    2025250    200200   18.1500  147.9000      10.3        23       886        92
VIS    2025250    200200   18.1300  145.7900       8.7        48       176        91
VIS    2025250    200200   18.1100  145.7700       8.6        49       177        90
VIS    2025250    200200   18.1300  148.9500      10.2        30       961        98
VIS    2025250    200200   18.1300  148.9500      10.1        30       961        98
VIS    2025250    200200   18.1300  148.9100       9.7        25       944        97
VIS    2025250    200200   18.1200  148.8900       9.8        30       941        99
VIS    2025250    200200   18.1300  148.8600      10.2        38       936        97
VIS    2025250    200200   18.1200  148.8300      10.2        41       918        97
VIS    2025250    200200   18.1300  148.8200      10.6        39       899        95
VIS    2025250    200200   18.1100  148.8000      11.2        35       897        93
VIS    2025250    200200   18.1200  148.7500      10.7        38       904        96
VIS    2025250    200200   18.1200  148.7400      10.3        40       921        97
VIS    2025250    200200   18.1200  148.7200       9.2        40       930        96
VIS    2025250    200200   18.1200  148.7000       8.7        42       938        94
VIS    2025250    200200   18.1200  148.6300       8.7        43       978        92
VIS    2025250    200200   18.1100  148.4800      10.2        27       961        94
VIS    2025250    200200   18.1100  148.4600      10.1        30       961        96
VIS    2025250    200200   18.1300  148.4300       9.4        29       943        98
VIS    2025250    200200   18.1200  148.4100       9.5        31       945        98
VIS    2025250    200200   18.1300  148.3900      10.1        32       949        98
VIS    2025250    200200   18.1200  148.3700      10.6        33       954        97
VIS    2025250    200200   18.1200  148.3500      10.9        32       948        97
VIS    2025250    200200   18.1100  148.3200       9.9        29       944        98
VIS    2025250    200200   18.1100  148.2800       9.8        25       953        98
VIS    2025250    200200   18.1200  148.2500       9.9        31       956        98
VIS    2025250    200200   18.1100  148.2200       9.8        31       954        94
VIS    2025250    200200   18.1100  148.2000       9.9        30       930        96
VIS    2025250    200200   18.1200  148.1600      10.3        26       915        99
VIS    2025250    200200   18.1000  148.1500      10.7        26       941        99
VIS    2025250    200200   18.1200  148.1200      10.7        19       979        98
VIS    2025250    200200   18.1200  148.0900      10.3        18       991        96
VIS    2025250    200200   18.1200  147.8700      10.7        23       897        91
VIS    2025250    200200   18.1000  147.8500      10.5        26       933        99
VIS    2025250    200200   18.1000  145.7700       9.6        44       180        92
VIS    2025250    200200   18.0900  145.2200      11.7       153       185        92
VIS    2025250    200200   18.1000  148.9100       9.6        26       961        98
VIS    2025250    200200   18.0900  148.9000       9.5        27       961        98
VIS    2025250    200200   18.1100  148.8600       9.9        41       936        96
VIS    2025250    200200   18.1000  148.8400       9.9        42       929        96
VIS    2025250    200200   18.1100  148.8300      10.0        41       918        97
VIS    2025250    200200   18.1100  148.8000      10.7        36       897        95
VIS    2025250    200200   18.1000  148.7700      11.1        35       899        95
VIS    2025250    200200   18.1000  148.7400       9.9        38       904        99
VIS    2025250    200200   18.1000  148.7200       9.4        35       899       100
VIS    2025250    200200   18.1000  148.6900       9.0        40       938        95
VIS    2025250    200200   18.1000  148.4700      10.4        30       977        95
VIS    2025250    200200   18.1000  148.4600      10.3        30       969        96
VIS    2025250    200200   18.0900  148.4200      10.4        33       972        96
VIS    2025250    200200   18.0900  148.4100      10.6        33       985        96
VIS    2025250    200200   18.1000  148.3700      10.9        32       955        97
VIS    2025250    200200   18.1000  148.3700      10.9        33       955        97
VIS    2025250    200200   18.0900  148.3400      10.4        31       948        98
VIS    2025250    200200   18.0900  148.3000      10.1        23       950        99
VIS    2025250    200200   18.1000  148.2500      10.3        28       960        99
VIS    2025250    200200   18.1000  148.2200      10.1        31       961        94
VIS    2025250    200200   18.1000  148.1800      10.1        30       930        98
VIS    2025250    200200   18.1000  148.1500      10.9        26       950        99
VIS    2025250    200200   18.1000  148.1400      10.8        25       958        99
VIS    2025250    200200   18.0800  148.1200      10.5        29       964        97
VIS    2025250    200200   18.0800  147.9100      10.3        26       979        93
VIS    2025250    200200   18.1000  147.8900      10.6        21       970        96
VIS    2025250    200200   18.0800  147.8600      10.1        24       964        97
VIS    2025250    200200   18.0800  147.8500      10.0        24       961        98
VIS    2025250    200200   18.0800  147.5600      11.4        37       713        90
VIS    2025250    200200   18.0800  145.7900       8.2        42       175        90
VIS    2025250    200200   18.0700  145.7500      10.7        31       178        94
VIS    2025250    200200   18.0600  148.8800       9.2        32       941        99
VIS    2025250    200200   18.0600  148.8700       9.2        36       940        98
VIS    2025250    200200   18.0600  148.8300       9.2        43       925        96
VIS    2025250    200200   18.0700  148.8100       9.2        41       913        99
VIS    2025250    200200   18.0600  148.7800       9.9        37       897        98
VIS    2025250    200200   18.0600  148.7700      10.3        37       893        96
VIS    2025250    200200   18.0800  148.7300       9.8        35       873        98
VIS    2025250    200200   18.0700  148.7100       9.7        31       873        98
VIS    2025250    200200   18.0800  148.6800       9.3        40       935        93
VIS    2025250    200200   18.0600  148.6700      10.0        36       935        95
VIS    2025250    200200   18.0700  148.4900      10.8        26       984        98
VIS    2025250    200200   18.0700  148.4600      10.8        35       977        96
VIS    2025250    200200   18.0600  148.4500      10.4        38       984        94
VIS    2025250    200200   18.0700  148.4100      10.6        36       992        95
VIS    2025250    200200   18.0700  148.4000      10.7        35       985        95
VIS    2025250    200200   18.0600  148.3700      10.6        36       972        95
VIS    2025250    200200   18.0700  148.3400      10.8        35       962        96
VIS    2025250    200200   18.0700  148.3100      10.4        27       956        99
VIS    2025250    200200   18.0700  148.3000      10.5        24       956        96
VIS    2025250    200200   18.0600  148.2500      10.6        21       970        98
VIS    2025250    200200   18.0800  148.2300      10.4        24       970        95
VIS    2025250    200200   18.0600  148.1900      10.3        29       964        95
VIS    2025250    200200   18.0700  148.1700      11.0        28       958        97
VIS    2025250    200200   18.0500  148.1300      10.9        30       940        99
VIS    2025250    200200   18.0600  148.1200      10.4        32       938        98
VIS    2025250    200200   18.0500  148.1100      10.3        32       938        98
VIS    2025250    200200   18.0500  148.0700       9.8        24       979        95
VIS    2025250    200200   18.0500  148.0600      10.0        20       979        94
VIS    2025250    200200   18.0700  147.9100      10.1        28       979        94
VIS    2025250    200200   18.0700  147.9000      10.2        25       979        96
VIS    2025250    200200   18.0500  147.8800      10.4        22       969        97
VIS    2025250    200200   18.0500  147.8400      10.4        22       961        98
VIS    2025250    200200   18.0500  147.8300      10.3        23       959        98
VIS    2025250    200200   18.0600  147.7900      10.4        25       864        97
VIS    2025250    200200   18.0300  145.4700       4.0       116       170        91
VIS    2025250    200200   18.0600  148.8800       9.3        31       944        99
VIS    2025250    200200   18.0600  148.8700       9.3        33       944        99
VIS    2025250    200200   18.0500  148.8200       9.2        42       925        97
VIS    2025250    200200   18.0500  148.8000       9.1        39       907       100
VIS    2025250    200200   18.0400  148.7900       8.8        38       907        99
VIS    2025250    200200   18.0600  148.7700       9.9        37       893        97
VIS    2025250    200200   18.0500  148.7300      10.1        33       873        97
VIS    2025250    200200   18.0400  148.7000      10.1        29       873        96
VIS    2025250    200200   18.0400  148.6800      10.1        33       934        98
VIS    2025250    200200   18.0500  148.6700      10.2        33       934        98
VIS    2025250    200200   18.0500  148.6500      10.0        38       965        92
VIS    2025250    200200   18.0400  148.5200       9.5        27       997        91
VIS    2025250    200200   18.0300  148.4900       9.4        27       975        91
VIS    2025250    200200   18.0400  148.4800       9.5        28       971        94
VIS    2025250    200200   18.0400  148.4400       9.8        40       971        94
VIS    2025250    200200   18.0400  148.3900      10.1        38       970        95
VIS    2025250    200200   18.0500  148.3700      10.4        35       966        96
VIS    2025250    200200   18.0300  148.3600      10.5        32       962        97
VIS    2025250    200200   18.0300  148.3300      10.6        30       956        96
VIS    2025250    200200   18.0300  148.3100      10.6        28       954        98
VIS    2025250    200200   18.0500  148.1900      10.2        29       964        95
VIS    2025250    200200   18.0500  148.1700      10.2        31       961        95
VIS    2025250    200200   18.0500  148.1300      10.7        31       938        98
VIS    2025250    200200   18.0300  148.1000      10.5        31       928        98
VIS    2025250    200200   18.0300  148.0900      10.5        29       943        98
VIS    2025250    200200   18.0500  148.0700       9.8        25       976        95
VIS    2025250    200200   18.0400  148.0300       9.7        18       987        92
VIS    2025250    200200   18.0500  148.0200       9.7        20       987        91
VIS    2025250    200200   18.0300  147.9800      10.1        33       979        94
VIS    2025250    200200   18.0300  147.9200      10.0        22       985        98
VIS    2025250    200200   18.0400  147.8500      10.5        22       959        98
VIS    2025250    200200   18.0400  147.8400      10.4        23       959        98
VIS    2025250    200200   18.0300  147.8200      10.3        23       959        97
VIS    2025250    200200   18.0300  147.7800      10.4        31       936        95
VIS    2025250    200200   18.0100  145.3800       4.5       145       135        95
VIS    2025250    200200   18.0100  148.8200       9.3        39       937        98
VIS    2025250    200200   18.0300  148.8200       9.1        39       925        98
VIS    2025250    200200   18.0200  148.7800       8.4        41       897        91
VIS    2025250    200200   18.0100  148.7200       9.6        32       873        91
VIS    2025250    200200   18.0100  148.7200       9.7        30       872        92
VIS    2025250    200200   18.0300  148.6900      10.0        32       873        97
VIS    2025250    200200   18.0100  148.6500       9.5        36       948        91
VIS    2025250    200200   18.0200  148.6400       9.6        38       965        92
VIS    2025250    200200   18.0300  148.5300       9.0        36       996        95
VIS    2025250    200200   18.0300  148.5000       9.5        26       975        92
VIS    2025250    200200   18.0300  148.4300       9.2        43       971        92
VIS    2025250    200200   18.0300  148.4100       9.6        40       972        93
VIS    2025250    200200   18.0100  148.3800      10.3        35       966        96
VIS    2025250    200200   18.0100  148.3400      10.4        25       956        90
VIS    2025250    200200   18.0200  148.3200      10.4        29       954        98
VIS    2025250    200200   18.0200  148.3000      10.6        25       952       100
VIS    2025250    200200   18.0100  148.2900      10.6        23       952       100
VIS    2025250    200200   18.0200  148.2500      11.8        18       968        99
VIS    2025250    200200   18.0100  148.2200      11.0        26       978        98
VIS    2025250    200200   18.0100  148.2000      10.6        30       985        94
VIS    2025250    200200   18.0200  148.1900      10.0        30       979        96
VIS    2025250    200200   18.0300  148.1500       9.9        33       940        97
VIS    2025250    200200   18.0100  148.1300      10.1        30       928        98
VIS    2025250    200200   18.0200  148.0900      10.4        28       943        97
VIS    2025250    200200   18.0200  148.0000       9.6        30       975        95
VIS    2025250    200200   18.0200  147.9700      10.1        34       979        93
VIS    2025250    200200   18.0200  147.9200      10.0        22       985        97
VIS    2025250    200200   18.0200  147.8500      10.5        21       959        97
VIS    2025250    200200   18.0200  147.8300      10.2        22       950        96
VIS    2025250    200200   18.0200  147.8200      10.1        23       941        96
VIS    2025250    200200   18.0100  147.8000      10.1        27       941        95
VIS    2025250    200200   18.0200  147.7700      10.2        33       936        97
VIS    2025250    200200   17.9900  145.9400       9.2        46       185        90
VIS    2025250    200200   18.0100  148.8200       9.3        38       937        98
VIS    2025250    200200   17.9900  148.8100       8.9        39       937        97
VIS    2025250    200200   18.0100  148.7800       8.3        41       909        94
VIS    2025250    200200   17.9900  148.7500       8.6        41       901        95
VIS    2025250    200200   18.0000  148.6900       9.1        32       874        93
VIS    2025250    200200   17.9900  148.6700       9.0        33       927        94
VIS    2025250    200200   17.9800  148.4300       8.6        43       983        92
VIS    2025250    200200   17.9900  148.3700      10.2        26       972        98
VIS    2025250    200200   17.9900  148.3000      10.7        24       939        95
VIS    2025250    200200   18.0000  148.2800      10.5        24       952        99
VIS    2025250    200200   17.9800  148.2500      10.5        18       956        96
VIS    2025250    200200   17.9900  148.2200      11.0        29       978        97
VIS    2025250    200200   17.9900  148.2100      11.1        29       979        96
VIS    2025250    200200   18.0000  148.1700      10.3        24       966        98
VIS    2025250    200200   18.0000  148.1500       9.9        26       953        98
VIS    2025250    200200   18.0000  148.1400      10.1        25       953        98
VIS    2025250    200200   17.9900  148.1100      10.4        25       931        98
VIS    2025250    200200   17.9800  148.0300      10.1        20       978        98
VIS    2025250    200200   17.9800  148.0100       9.8        27       966        97
VIS    2025250    200200   17.9900  147.9900      10.4        37       930        97
VIS    2025250    200200   17.9800  147.9600      10.8        39       930        95
VIS    2025250    200200   18.0000  147.8500      10.7        17       960        91
VIS    2025250    200200   18.0000  147.8400      10.9        15       950        94
VIS    2025250    200200   17.9900  147.8000      10.6        18       925        97
VIS    2025250    200200   17.9900  147.7900      10.1        24       925        98
VIS    2025250    200200   17.9800  147.7700      10.3        24       889        98
VIS    2025250    200200   17.9800  147.7500       9.6        26       867        98
VIS    2025250    200200   17.9700  144.7600      14.3       183       186        94
VIS    2025250    200200   17.9700  148.8400      10.0        25       993        94
VIS    2025250    200200   17.9600  148.8300       9.4        26       996        92
VIS    2025250    200200   17.9600  148.7800       8.6        36       949        90
VIS    2025250    200200   17.9700  148.7600       8.4        42       916        93
VIS    2025250    200200   17.9600  148.7400       8.5        37       931        96
VIS    2025250    200200   17.9600  148.7300       8.6        38       931        96
VIS    2025250    200200   17.9700  148.6900       8.7        34       925        98
VIS    2025250    200200   17.9800  148.6700       9.0        33       927        94
VIS    2025250    200200   17.9800  148.6500       9.0        32       949        93
VIS    2025250    200200   17.9700  148.6300       8.8        25       983        90
VIS    2025250    200200   17.9800  148.4200       8.7        41       983        93
VIS    2025250    200200   17.9700  148.3900       9.4        31       976        97
VIS    2025250    200200   17.9600  148.3600      10.0        24       964        99
VIS    2025250    200200   17.9600  148.3600      10.2        22       962        98
VIS    2025250    200200   17.9600  148.3300      10.8        17       958        99
VIS    2025250    200200   17.9700  148.2900      10.4        23       939        98
VIS    2025250    200200   17.9600  148.2700      10.1        20       939        93
VIS    2025250    200200   17.9700  148.2600      10.1        20       947        94
VIS    2025250    200200   17.9800  148.2300      10.9        23       964        99
VIS    2025250    200200   17.9600  148.2000      11.4        27       971        97
VIS    2025250    200200   17.9700  148.1800      11.0        27       966        96
VIS    2025250    200200   17.9600  148.1400      10.0        26       958        96
VIS    2025250    200200   17.9600  148.1300      10.1        26       960        96
VIS    2025250    200200   17.9700  148.1000      10.4        27       940        98
VIS    2025250    200200   17.9800  148.0700       9.8        30       943        94
VIS    2025250    200200   17.9600  148.0600       9.9        32       945        97
VIS    2025250    200200   17.9600  148.0200       9.7        19       978        99
VIS    2025250    200200   17.9700  148.0100       9.8        23       966        98
VIS    2025250    200200   17.9600  147.9900      10.4        29       963        97
VIS    2025250    200200   17.9700  147.9600      10.9        40       931        95
VIS    2025250    200200   17.9700  147.8100      10.9        15       935        97
VIS    2025250    200200   17.9700  147.8100      10.7        16       935        98
VIS    2025250    200200   17.9700  147.7600      10.1        24       888        98
VIS    2025250    200200   17.9700  147.7600      10.1        24       871        98
VIS    2025250    200200   17.9300  144.7500      12.3       187       184        91
VIS    2025250    200200   17.9500  149.0700       8.9        24       993        99
VIS    2025250    200200   17.9600  148.8500       9.5        20       993        95
VIS    2025250    200200   17.9600  148.7800       8.8        35       949        90
VIS    2025250    200200   17.9600  148.7500       8.6        33       931        98
VIS    2025250    200200   17.9600  148.7300       8.7        37       935        96
VIS    2025250    200200   17.9400  148.7100       8.6        39       948        94
VIS    2025250    200200   17.9400  148.6900       8.5        38       933        96
VIS    2025250    200200   17.9400  148.6400       9.3        32       938        98
VIS    2025250    200200   17.9400  148.6400       9.2        31       953        97
VIS    2025250    200200   17.9400  148.6100       9.2        28       981        97
VIS    2025250    200200   17.9500  148.5700       8.8        40       992        91
VIS    2025250    200200   17.9400  148.5600       9.2        38       981        92
VIS    2025250    200200   17.9400  148.4200       9.5        34       996        95
VIS    2025250    200200   17.9300  148.4100       9.8        33       986        96
VIS    2025250    200200   17.9400  148.3800       9.8        34       967        96
VIS    2025250    200200   17.9500  148.3500      10.4        22       961        99
VIS    2025250    200200   17.9400  148.3200      10.4        22       958       100
VIS    2025250    200200   17.9400  148.3100      10.2        23       956       100
VIS    2025250    200200   17.9400  148.2800      10.0        22       940        96
VIS    2025250    200200   17.9500  148.2700      10.2        20       939        93
VIS    2025250    200200   17.9300  148.2400      10.6        20       936        95
VIS    2025250    200200   17.9400  148.2000      11.3        26       960        97
VIS    2025250    200200   17.9300  148.1700      10.6        28       958        98
VIS    2025250    200200   17.9300  148.1600      10.3        27       958        98
VIS    2025250    200200   17.9500  148.1400      10.0        26       960        97
VIS    2025250    200200   17.9400  148.1000      10.0        28       967        96
VIS    2025250    200200   17.9300  148.0800       9.8        32       967        96
VIS    2025250    200200   17.9400  148.0500       9.8        32       940        97
VIS    2025250    200200   17.9400  148.0500       9.7        31       948        96
VIS    2025250    200200   17.9500  148.0000      10.0        24       966        98
VIS    2025250    200200   17.9400  147.9700      10.7        34       963        95
VIS    2025250    200200   17.9300  147.9500      10.3        43       963        92
VIS    2025250    200200   17.9400  147.8000      10.4        26       935        98
VIS    2025250    200200   17.9500  147.7700      10.8        24       871        97
VIS    2025250    200200   17.9300  147.7500      11.0        24       871        91
VIS    2025250    200200   17.9300  147.5000      11.4        33       765        94
VIS    2025250    200200   17.9300  147.5000      11.4        33       765        94
VIS    2025250    200200   17.9400  149.0800       9.0        23       993        99
VIS    2025250    200200   17.9200  148.7900      10.3        35       971        90
VIS    2025250    200200   17.9100  148.7900      10.2        35       971        92
VIS    2025250    200200   17.9100  148.7400       9.2        29       967        99
VIS    2025250    200200   17.9200  148.7400       9.2        29       960        99
VIS    2025250    200200   17.9300  148.7100       8.6        39       948        94
VIS    2025250    200200   17.9300  148.6800       8.7        35       933        95
VIS    2025250    200200   17.9200  148.6500       9.3        30       938        98
VIS    2025250    200200   17.9200  148.6400       9.6        27       959        98
VIS    2025250    200200   17.9300  148.6100       9.2        28       981        96
VIS    2025250    200200   17.9100  148.5900       9.4        31       966        95
VIS    2025250    200200   17.9100  148.5600       9.3        35       966        95
VIS    2025250    200200   17.9100  148.5300       8.9        33       955        96
VIS    2025250    200200   17.9200  148.4100       9.7        32       986        95
VIS    2025250    200200   17.9300  148.3900       9.8        34       985        95
VIS    2025250    200200   17.9100  148.3600       9.5        36       967        94
VIS    2025250    200200   17.9100  148.3300       9.8        33       971        97
VIS    2025250    200200   17.9300  148.3000      10.2        25       956        99
VIS    2025250    200200   17.9200  148.2900      10.1        26       950        97
VIS    2025250    200200   17.9100  148.2700      10.2        23       943        95
VIS    2025250    200200   17.9300  148.2400      10.6        19       934        96
VIS    2025250    200200   17.9300  148.2100      11.1        21       941        98
VIS    2025250    200200   17.9300  148.1800      10.6        27       955        98
VIS    2025250    200200   17.9200  148.1500      10.1        22       958        99
VIS    2025250    200200   17.9100  148.1500      10.0        19       958        99
VIS    2025250    200200   17.9200  148.1200      10.0        18       970        98
VIS    2025250    200200   17.9300  148.0800       9.7        32       967        96
VIS    2025250    200200   17.9200  148.0600       9.9        26       940        97
VIS    2025250    200200   17.9100  148.0500       9.7        23       939        95
VIS    2025250    200200   17.9100  147.9700      10.5        41       915        96
VIS    2025250    200200   17.9100  147.9300       9.9        43       959        92
VIS    2025250    200200   17.9000  147.8200       9.8        30       967        96
VIS    2025250    200200   17.9000  147.8200      10.1        29       967        97
VIS    2025250    200200   17.9000  147.7800      11.0        20       913        97
VIS    2025250    200200   17.9200  147.7600      10.9        24       890        97
VIS    2025250    200200   17.9200  147.7400      10.6        24       871        91
VIS    2025250    200200   17.9000  147.7200      11.0        29       810        92
VIS    2025250    200200   17.9200  147.6300       9.2        38       723        97
VIS    2025250    200200   17.9100  147.6100       9.5        38       739        97
VIS    2025250    200200   17.9100  147.5000      11.6        33       771        93
VIS    2025250    200200   17.9200  147.4900      11.5        33       771        94
VIS    2025250    200200   17.9100  147.4700      10.8        35       717        92
VIS    2025250    200200   17.9100  148.8000      10.4        37       977        91
VIS    2025250    200200   17.8900  148.7700       9.6        30       971        96
VIS    2025250    200200   17.9100  148.7400       9.4        27       970        99
VIS    2025250    200200   17.8900  148.7300       9.4        28       970        96
VIS    2025250    200200   17.9000  148.6900       8.9        29       952        97
VIS    2025250    200200   17.8900  148.6600       9.3        24       948        97
VIS    2025250    200200   17.8900  148.6400       9.7        24       958        95
VIS    2025250    200200   17.9100  148.6300       9.8        25       959        98
VIS    2025250    200200   17.8900  148.6100      10.1        27       959        95
VIS    2025250    200200   17.9100  148.5700       9.3        35       966        95
VIS    2025250    200200   17.8900  148.5500       9.1        32       953        96
VIS    2025250    200200   17.9000  148.3500       9.8        35       965        95
VIS    2025250    200200   17.8800  148.3200      10.0        24       963        99
VIS    2025250    200200   17.9000  148.3200      10.3        26       961        99
VIS    2025250    200200   17.9000  148.2700      10.5        22       943        95
VIS    2025250    200200   17.9000  148.2700      10.5        21       937        97
VIS    2025250    200200   17.8900  148.2400      10.7        14       930        96
VIS    2025250    200200   17.9000  148.2000      10.7        19       928        98
VIS    2025250    200200   17.9000  148.1700       9.9        25       946        98
VIS    2025250    200200   17.9000  148.1400      10.0        17       959        99
VIS    2025250    200200   17.9000  148.1000      10.1        18       971        98
VIS    2025250    200200   17.9000  148.0900      10.0        18       971        98
VIS    2025250    200200   17.9000  148.0400      10.1        15       961        96
VIS    2025250    200200   17.9000  148.0100      11.1         9       959        97
VIS    2025250    200200   17.8900  147.9900      10.9        12       959        97
VIS    2025250    200200   17.9000  147.9600      10.3        41       915        96
VIS    2025250    200200   17.8800  147.9200      10.1        41       894        98
VIS    2025250    200200   17.8800  147.9100      10.2        40       953        93
VIS    2025250    200200   17.8900  147.8300       9.1        29       968        95
VIS    2025250    200200   17.8800  147.7900       9.5        16       964        98
VIS    2025250    200200   17.8800  147.7900       9.9        15       956        98
VIS    2025250    200200   17.8800  147.7600      10.4        20       921        98
VIS    2025250    200200   17.9000  147.7200      11.2        30       844        96
VIS    2025250    200200   17.8800  147.7000      11.0        36       810        99
VIS    2025250    200200   17.8800  147.6200       9.2        31       739        92
VIS    2025250    200200   17.8900  147.6200       9.0        37       739        96
VIS    2025250    200200   17.8800  147.5000      11.3        32       784        94
VIS    2025250    200200   17.8800  147.4900      11.2        31       784        92
VIS    2025250    200200   17.8900  147.4500      10.8        32       717        90
VIS    2025250    200200   17.8800  148.7700       9.5        29       971        95
VIS    2025250    200200   17.8700  148.7400       9.6        24       972        99
VIS    2025250    200200   17.8800  148.7000       9.4        25       956        99
VIS    2025250    200200   17.8700  148.6800       9.0        24       952        97
VIS    2025250    200200   17.8800  148.6600       9.4        23       949        97
VIS    2025250    200200   17.8600  148.6300      10.2        30       949        91
VIS    2025250    200200   17.8800  148.6100      10.2        29       958        95
VIS    2025250    200200   17.8600  148.5800      10.3        33       944        97
VIS    2025250    200200   17.8700  148.5500       9.2        30       953        95
VIS    2025250    200200   17.8800  148.3300      10.0        26       964        99
VIS    2025250    200200   17.8700  148.2800      10.6        13       949        95
VIS    2025250    200200   17.8600  148.2700      10.6        13       944        97
VIS    2025250    200200   17.8800  148.2400      10.8        13       932        95
VIS    2025250    200200   17.8600  148.2200      11.0        13       930        96
VIS    2025250    200200   17.8700  148.1800      10.1        21       933        98
VIS    2025250    200200   17.8600  148.1600       9.7        20       948        97
VIS    2025250    200200   17.8700  148.1100      10.0        16       965        97
VIS    2025250    200200   17.8700  148.0900      10.2        17       971        99
VIS    2025250    200200   17.8800  148.0300      10.1        14       969        99
VIS    2025250    200200   17.8700  148.0200       9.9        17       961        96
VIS    2025250    200200   17.8700  147.9800      10.7        16       969       100
VIS    2025250    200200   17.8700  147.9800      10.4        20       969        99
VIS    2025250    200200   17.8600  147.9400       9.7        36       883        99
VIS    2025250    200200   17.8700  147.9100      10.1        41       907        97
VIS    2025250    200200   17.8700  147.8000       9.0        21       965        95
VIS    2025250    200200   17.8700  147.7800      10.0        15       956        98
VIS    2025250    200200   17.8700  147.7500      10.2        20       921        96
VIS    2025250    200200   17.8500  147.7200       9.8        29       844        99
VIS    2025250    200200   17.8600  147.6900      10.5        36       774        97
VIS    2025250    200200   17.8500  147.6800      10.5        36       744        95
VIS    2025250    200200   17.8700  147.6200       9.2        30       739        91
VIS    2025250    200200   17.8500  147.5900       9.0        40       738        96
VIS    2025250    200200   17.8700  147.5800       8.9        43       712        93
VIS    2025250    200200   17.8600  147.5000      10.6        33       771        95
VIS    2025250    200200   17.8600  147.4800      10.8        27       820        94
VIS    2025250    200200   17.8700  147.4600      10.6        30       816        91
VIS    2025250    200200   17.8600  148.7600       9.8        23       989        96
VIS    2025250    200200   17.8600  148.7400       9.6        23       986        99
VIS    2025250    200200   17.8400  148.7000       9.5        20       982       100
VIS    2025250    200200   17.8400  148.6900       9.5        19       952        99
VIS    2025250    200200   17.8600  148.6700       9.0        27       938        94
VIS    2025250    200200   17.8600  148.6300      10.1        31       939        92
VIS    2025250    200200   17.8600  148.6300      10.2        32       939        93
VIS    2025250    200200   17.8500  148.5900      10.4        33       937        97
VIS    2025250    200200   17.8600  148.5800      10.3        33       939        97
VIS    2025250    200200   17.8400  148.5500      10.1        27       944        99
VIS    2025250    200200   17.8400  148.5200       9.7        19       935        98
VIS    2025250    200200   17.8500  148.4800       8.6        35       934        91
VIS    2025250    200200   17.8400  148.4700       8.3        44       934        93
VIS    2025250    200200   17.8600  148.3200      10.7        23       971       100
VIS    2025250    200200   17.8600  148.2900      10.7        13       965        98
VIS    2025250    200200   17.8500  148.2700      10.4        14       955        98
VIS    2025250    200200   17.8400  148.2500      10.7        19       961        93
VIS    2025250    200200   17.8300  148.2300      10.9        20       944        96
VIS    2025250    200200   17.8400  148.2000      10.6        18       938        98
VIS    2025250    200200   17.8400  148.1700       9.9        15       959        95
VIS    2025250    200200   17.8500  148.1500       9.7        15       963        95
VIS    2025250    200200   17.8300  148.1100      10.8        15       979        98
VIS    2025250    200200   17.8400  148.1000      10.4        18       979        98
VIS    2025250    200200   17.8300  148.0600      11.0        13       980        98
VIS    2025250    200200   17.8400  148.0200      10.2        16       988        92
VIS    2025250    200200   17.8500  147.9800      10.0        23       971        97
VIS    2025250    200200   17.8400  147.9600       9.9        30       901        97
VIS    2025250    200200   17.8400  147.9200       9.0        49       857        96
VIS    2025250    200200   17.8400  147.9100       8.9        47       857        95
VIS    2025250    200200   17.8400  147.7500       9.5        18       942        93
VIS    2025250    200200   17.8300  147.7400       9.9        17       941        94
VIS    2025250    200200   17.8400  147.7000      10.1        30       837        99
VIS    2025250    200200   17.8300  147.6800      10.4        33       787        97
VIS    2025250    200200   17.8500  147.6600       9.7        34       707        94
VIS    2025250    200200   17.8400  147.6200       9.6        27       754        93
VIS    2025250    200200   17.8300  147.6200       9.8        27       754        91
VIS    2025250    200200   17.8300  147.5700       9.0        36       738        97
VIS    2025250    200200   17.8300  147.5500       9.6        30       751        94
VIS    2025250    200200   17.8300  147.5400       9.8        27       751        93
VIS    2025250    200200   17.8400  147.5100       9.6        31       777        96
VIS    2025250    200200   17.8400  147.4900      10.3        26       820        97
VIS    2025250    200200   17.8300  147.4700      10.5        23       823        95
VIS    2025250    200200   17.8500  147.4300       9.2        40       717        90
VIS    2025250    200200   17.8300  148.6800       9.7        18       949       100
VIS    2025250    200200   17.8300  148.6600      10.3        19       939        96
VIS    2025250    200200   17.8100  148.6200       9.8        31       927        98
VIS    2025250    200200   17.8300  148.6000      10.1        34       932        98
VIS    2025250    200200   17.8100  148.5900      10.1        33       932        98
VIS    2025250    200200   17.8300  148.5500      10.0        25       944       100
VIS    2025250    200200   17.8300  148.5400      10.0        23       934       100
VIS    2025250    200200   17.8300  148.5200       9.7        19       925        99
VIS    2025250    200200   17.8100  148.4800       8.9        33       871        98
VIS    2025250    200200   17.8300  148.4600       8.6        39       934        93
VIS    2025250    200200   17.8200  148.3000      11.8        15       995        98
VIS    2025250    200200   17.8100  148.2700      12.1         9       992        94
VIS    2025250    200200   17.8300  148.2300      10.9        21       945        94
VIS    2025250    200200   17.8200  148.2100      10.8        23       945        97
VIS    2025250    200200   17.8300  148.1800      10.3        17       953        97
VIS    2025250    200200   17.8300  148.1800      10.2        17       959        97
VIS    2025250    200200   17.8100  148.1400      11.0        13       972        97
VIS    2025250    200200   17.8100  148.1200      10.8        14       967        92
VIS    2025250    200200   17.8100  148.1000      10.9        14       967        96
VIS    2025250    200200   17.8200  148.0700      11.1        13       972        97
VIS    2025250    200200   17.8100  148.0300      10.5        16       980        97
VIS    2025250    200200   17.8100  148.0000      10.1        26       980        97
VIS    2025250    200200   17.8200  147.9700       9.9        29       971        92
VIS    2025250    200200   17.8100  147.9400       9.5        41       863        99
VIS    2025250    200200   17.8200  147.9100       8.9        47       846        96
VIS    2025250    200200   17.8100  147.9000       8.8        44       846        96
VIS    2025250    200200   17.8100  147.8400       9.7        36       959        94
VIS    2025250    200200   17.8100  147.7900      12.0        14       973        97
VIS    2025250    200200   17.8100  147.7700      11.5        13       957        99
VIS    2025250    200200   17.8100  147.7500      11.2        12       939        95
VIS    2025250    200200   17.8200  147.7200      10.2        19       923        94
VIS    2025250    200200   17.8000  147.6900      10.8        24       880        97
VIS    2025250    200200   17.8100  147.6800      10.3        29       832        98
VIS    2025250    200200   17.8100  147.6400       9.7        30       731        94
VIS    2025250    200200   17.8200  147.6300       9.9        27       731        92
VIS    2025250    200200   17.8200  147.5700       9.2        34       738        96
VIS    2025250    200200   17.8200  147.5400      10.1        25       770        93
VIS    2025250    200200   17.8000  147.5400      10.5        23       794        93
VIS    2025250    200200   17.8200  147.4900       9.9        31       819        99
VIS    2025250    200200   17.8100  147.4700      10.5        28       823        98
VIS    2025250    200200   17.8100  147.4600      10.4        28       825        98
VIS    2025250    200200   17.8000  147.4400      10.1        27       825        98
VIS    2025250    200200   17.8200  147.4100       9.5        35       747        97
VIS    2025250    200200   17.8300  151.6000       8.2        58       997        93
VIS    2025250    200200   17.7900  148.7600      10.9        37       979        92
VIS    2025250    200200   17.8000  148.6900      11.1        18       976        99
VIS    2025250    200200   17.8000  148.6700      10.9        16       956        97
VIS    2025250    200200   17.8000  148.6600      10.6        17       950        91
VIS    2025250    200200   17.8100  148.6200       9.6        30       927        98
VIS    2025250    200200   17.8100  148.5900      10.0        32       927        97
VIS    2025250    200200   17.8000  148.5700      10.2        30       919        98
VIS    2025250    200200   17.8000  148.5600      10.2        30       919        98
VIS    2025250    200200   17.7900  148.5400      10.1        26       872        95
VIS    2025250    200200   17.8000  148.4900      10.0        25       869        95
VIS    2025250    200200   17.8000  148.4900      10.0        26       869        95
VIS    2025250    200200   17.7900  148.4400       8.9        32       938        98
VIS    2025250    200200   17.7900  148.4400       8.9        34       938        96
VIS    2025250    200200   17.7900  148.3100      10.5        16       984        98
VIS    2025250    200200   17.7900  148.2900      11.0        12       966        98
VIS    2025250    200200   17.8000  148.1700      10.8        20       959        97
VIS    2025250    200200   17.7900  148.1400      11.2        14       936        96
VIS    2025250    200200   17.7900  148.1200      11.0        13       938        91
VIS    2025250    200200   17.8000  148.1100      10.9        12       953        91
VIS    2025250    200200   17.7800  148.0700      10.2        14       966        99
VIS    2025250    200200   17.7900  148.0600      10.2        15       967        99
VIS    2025250    200200   17.7900  148.0300      10.2        19       978        99
VIS    2025250    200200   17.7800  148.0000      10.6        17       972        99
VIS    2025250    200200   17.7800  147.9900      10.4        17       978       100
VIS    2025250    200200   17.7800  147.9500       9.7        22       902        97
VIS    2025250    200200   17.8000  147.9200       9.2        43       846        99
VIS    2025250    200200   17.8000  147.9100       9.0        41       846        99
VIS    2025250    200200   17.7800  147.8900       8.6        44       846        98
VIS    2025250    200200   17.7900  147.8600       8.8        45       909        92
VIS    2025250    200200   17.7800  147.8200      10.1        34       956        95
VIS    2025250    200200   17.7800  147.7900      11.8        15       963       100
VIS    2025250    200200   17.7900  147.7800      12.1        14       963        98
VIS    2025250    200200   17.8000  147.7700      11.6        12       941        97
VIS    2025250    200200   17.8000  147.7400      11.4        13       939        93
VIS    2025250    200200   17.7900  147.7000      11.3        19       880        93
VIS    2025250    200200   17.7800  147.6800      10.7        25       847        95
VIS    2025250    200200   17.7800  147.6700      10.5        29       832        94
VIS    2025250    200200   17.7800  147.6300      10.0        32       738        94
VIS    2025250    200200   17.8000  147.5600       9.8        27       751        93
VIS    2025250    200200   17.7900  147.5400      10.0        26       794        94
VIS    2025250    200200   17.7800  147.5200      10.5        23       831        97
VIS    2025250    200200   17.7800  147.4900      10.8        28       819        97
VIS    2025250    200200   17.8000  147.4500      10.3        31       823        99
VIS    2025250    200200   17.8000  147.4400       9.7        32       823        99
VIS    2025250    200200   17.7900  147.4200       8.9        32       708        95
VIS    2025250    200200   17.7600  144.9100       9.8       224       178        97
VIS    2025250    200200   17.8200  151.6000       8.3        59       997        95
VIS    2025250    200200   17.8200  151.5800       8.6        53       997        94
VIS    2025250    200200   17.7700  148.7500      10.4        34       981        91
VIS    2025250    200200   17.7700  148.7200      10.4        31       981        96
VIS    2025250    200200   17.7800  148.6900      10.4        33       975        96
VIS    2025250    200200   17.7700  148.6800      10.2        36       967        95
VIS    2025250    200200   17.7800  148.6500       8.8        31       948        93
VIS    2025250    200200   17.7800  148.5700      10.0        32       915        98
VIS    2025250    200200   17.7800  148.5600      10.0        30       908        99
VIS    2025250    200200   17.7600  148.5300       9.9        26       872        96
VIS    2025250    200200   17.7800  148.4900      10.1        28       869        96
VIS    2025250    200200   17.7800  148.4900      10.1        28       869        96
VIS    2025250    200200   17.7800  148.4600       9.7        28       901       100
VIS    2025250    200200   17.7600  148.4100       9.9        22       938        90
VIS    2025250    200200   17.7600  148.3800      11.8         9       978        95
VIS    2025250    200200   17.7600  148.3400      10.1        20       984        93
VIS    2025250    200200   17.7600  148.3200       9.8        19       966        96
VIS    2025250    200200   17.7600  148.3100      10.0        18       966        97
VIS    2025250    200200   17.7800  148.2900      11.0        12       955        98
VIS    2025250    200200   17.7700  148.2400      11.2        12       970        99
VIS    2025250    200200   17.7800  148.2000      10.9        16       965        96
VIS    2025250    200200   17.7700  148.1900      10.8        17       964        95
VIS    2025250    200200   17.7700  148.1500      10.4        23       936        97
VIS    2025250    200200   17.7700  148.1400      10.6        19       936        98
VIS    2025250    200200   17.7600  148.1100      10.4        17       936        96
VIS    2025250    200200   17.7700  148.0800       9.7        15       938        96
VIS    2025250    200200   17.7800  148.0500       9.7        17       966        99
VIS    2025250    200200   17.7700  147.9900      10.3        12       972        99
VIS    2025250    200200   17.7700  147.9600      10.2        12       972        98
VIS    2025250    200200   17.7700  147.9500      10.3        13       933        96
VIS    2025250    200200   17.7700  147.9200      10.0        22       868        96
VIS    2025250    200200   17.7800  147.8800       8.5        45       846        97
VIS    2025250    200200   17.7700  147.8700       8.6        44       860        95
VIS    2025250    200200   17.7600  147.8300      10.0        38       909        96
VIS    2025250    200200   17.7700  147.8000      11.1        24       963        99
VIS    2025250    200200   17.7600  147.8000      11.3        20       963        99
VIS    2025250    200200   17.7600  147.7600      11.4        16       939        97
VIS    2025250    200200   17.7700  147.7200      11.2        13       875        92
VIS    2025250    200200   17.7600  147.6900      11.0        28       847        98
VIS    2025250    200200   17.7800  147.6800      10.5        28       838        94
VIS    2025250    200200   17.7700  147.6500      10.8        36       775        96
VIS    2025250    200200   17.7500  147.6100      10.9        30       756        91
VIS    2025250    200200   17.7600  147.5200       9.9        28       831        97
VIS    2025250    200200   17.7700  147.4900      10.7        28       819        97
VIS    2025250    200200   17.7500  147.4600      10.6        33       756        95
VIS    2025250    200200   17.7500  147.4400       9.4        33       708        94
VIS    2025250    200200   17.7500  147.4200       7.4        37       707        92
VIS    2025250    200200   17.7300  145.0700       9.1       245       183        97
VIS    2025250    200200   17.7300  145.0700       9.0       246       183        96
VIS    2025250    200200   17.7300  145.0100       8.1       230       178        93
VIS    2025250    200200   17.7400  144.9500       8.3       216       179        91
VIS    2025250    200200   17.7300  144.9300       8.1       223       178        99
VIS    2025250    200200   17.7300  144.9000       8.2       211       164        94
VIS    2025250    200200   17.7900  151.5800       7.9        50       998        98
VIS    2025250    200200   17.7600  148.7400      10.3        32       981        94
VIS    2025250    200200   17.7600  148.7300      10.3        33       981        94
VIS    2025250    200200   17.7400  148.7000      10.6        39       957        91
VIS    2025250    200200   17.7500  148.6700      10.0        38       958        94
VIS    2025250    200200   17.7600  148.6400       8.9        38       948        93
VIS    2025250    200200   17.7400  148.6200       9.3        36       940        92
VIS    2025250    200200   17.7400  148.6000       9.2        36       934        96
VIS    2025250    200200   17.7400  148.5700       9.4        32       916        99
VIS    2025250    200200   17.7500  148.5600       9.4        29       911        99
VIS    2025250    200200   17.7500  148.5200       9.5        25       899        99
VIS    2025250    200200   17.7400  148.5000       9.5        27       901        99
VIS    2025250    200200   17.7400  148.4600       9.7        30       899        98
VIS    2025250    200200   17.7400  148.4600       9.8        30       899        99
VIS    2025250    200200   17.7400  148.4200      10.0        23       906        99
VIS    2025250    200200   17.7500  148.4100       9.7        24       938        99
VIS    2025250    200200   17.7400  148.3700       9.4        17       968        97
VIS    2025250    200200   17.7400  148.3500       9.3        19       968        96
VIS    2025250    200200   17.7500  148.3200       9.9        20       966        96
VIS    2025250    200200   17.7500  148.3100      10.0        19       955        97
VIS    2025250    200200   17.7500  148.2700      10.7        15       939        99
VIS    2025250    200200   17.7400  148.2600      10.6        17       934        99
VIS    2025250    200200   17.7500  148.2200      10.8        16       941       100
VIS    2025250    200200   17.7400  148.2100      10.7        17       930        99
VIS    2025250    200200   17.7400  148.1300      10.5        26       951        94
VIS    2025250    200200   17.7400  148.1200      10.7        23       951        94
VIS    2025250    200200   17.7500  148.0900      10.4        15       936        97
VIS    2025250    200200   17.7300  148.0500       9.7        10       935        96
VIS    2025250    200200   17.7400  148.0200       9.5        14       939        94
VIS    2025250    200200   17.7500  147.9900      10.3        10       972        97
VIS    2025250    200200   17.7400  147.9500      11.3         9       963        97
VIS    2025250    200200   17.7300  147.9400      11.3        10       933        99
VIS    2025250    200200   17.7400  147.9100      10.1        20       892        98
VIS    2025250    200200   17.7300  147.8900       9.6        30       847        98
VIS    2025250    200200   17.7300  147.8600       9.9        37       850        97
VIS    2025250    200200   17.7300  147.8500      10.1        34       875        97
VIS    2025250    200200   17.7400  147.8100      11.1        21       920       100
VIS    2025250    200200   17.7400  147.7800      10.9        17       931        98
VIS    2025250    200200   17.7500  147.7600      11.2        17       905        95
VIS    2025250    200200   17.7500  147.7300      11.0        18       865        93
VIS    2025250    200200   17.7500  147.7100      11.2        17       865        94
VIS    2025250    200200   17.7500  147.6800      11.0        30       828        98
VIS    2025250    200200   17.7400  147.6700      11.0        31       820        99
VIS    2025250    200200   17.7400  147.6500      11.4        32       806        96
VIS    2025250    200200   17.7500  147.6300      11.4        33       789        91
VIS    2025250    200200   17.7300  147.5700      11.0        21       790        92
VIS    2025250    200200   17.7400  147.5500      10.0        32       772        93
VIS    2025250    200200   17.7300  147.5100      10.3        32       831        98
VIS    2025250    200200   17.7500  147.4800      10.7        32       788        95
VIS    2025250    200200   17.7400  147.4600      10.1        29       755        90
VIS    2025250    200200   17.7300  147.4100       8.2        26       719        94
VIS    2025250    200200   17.7300  147.4000       8.3        27       719        94
VIS    2025250    200200   17.7300  145.4400       4.9       269       177        90
VIS    2025250    200200   17.7300  145.4300       4.9       268       177        90
VIS    2025250    200200   17.7300  145.4100       4.4       267       177        91
VIS    2025250    200200   17.7100  145.3200       5.6       269       179        93
VIS    2025250    200200   17.7200  145.3100       6.1       268       174        97
VIS    2025250    200200   17.7200  145.2800       6.5       261       174        95
VIS    2025250    200200   17.7300  145.0700       8.9       247       183        96
VIS    2025250    200200   17.7300  145.0700       8.7       248       183        95
VIS    2025250    200200   17.7100  144.9500       7.2       230       179        98
VIS    2025250    200200   17.7300  144.9300       7.7       222       177       100
VIS    2025250    200200   17.7100  144.9000       7.5       206       155        90
VIS    2025250    200200   17.7200  144.8800       8.5       204       158        92
VIS    2025250    200200   17.7300  144.8700       8.4       206       158        91
VIS    2025250    200200   17.7300  144.8300      10.1       223       188        94
VIS    2025250    200200   17.7700  151.5700       7.6        51       999        98
VIS    2025250    200200   17.7500  151.5500       7.8        54       981        90
VIS    2025250    200200   17.7200  148.7300      10.3        39       967        90
VIS    2025250    200200   17.7200  148.7000      10.9        41       956        90
VIS    2025250    200200   17.7400  148.6900      10.7        39       956        91
VIS    2025250    200200   17.7200  148.6600      10.6        39       958        91
VIS    2025250    200200   17.7200  148.6400      10.3        37       958        91
VIS    2025250    200200   17.7300  148.6000       9.3        32       934        95
VIS    2025250    200200   17.7300  148.5900       9.4        30       932        97
VIS    2025250    200200   17.7200  148.5500      10.0        28       911        98
VIS    2025250    200200   17.7400  148.5300       9.5        26       908       100
VIS    2025250    200200   17.7200  148.5100       9.4        27       908        98
VIS    2025250    200200   17.7200  148.5000       9.3        27       907        98
VIS    2025250    200200   17.7200  148.4600       9.7        26       904       100
VIS    2025250    200200   17.7100  148.4400       9.8        21       904        99
VIS    2025250    200200   17.7200  148.4000       9.8        17       938        99
VIS    2025250    200200   17.7100  148.3900       9.3        16       941        96
VIS    2025250    200200   17.7200  148.3700       9.8        14       940        99
VIS    2025250    200200   17.7300  148.3300       9.8        19       943       100
VIS    2025250    200200   17.7200  148.3200       9.7        19       943       100
VIS    2025250    200200   17.7100  148.3000       9.7        18       929       100
VIS    2025250    200200   17.7200  148.2600      10.1        18       923        99
VIS    2025250    200200   17.7100  148.2500      10.3        18       923        99
VIS    2025250    200200   17.7300  148.2100      10.6        17       930        99
VIS    2025250    200200   17.7300  148.2000      10.8        17       930        99
VIS    2025250    200200   17.7100  148.1600      11.2        21       982        94
VIS    2025250    200200   17.7100  148.1500      11.2        21       981        94
VIS    2025250    200200   17.7300  148.1000      11.4        14       951        98
VIS    2025250    200200   17.7300  148.0700      11.4        12       939        99
VIS    2025250    200200   17.7300  148.0600      10.5        10       935        98
VIS    2025250    200200   17.7100  148.0100      10.2        22       960        94
VIS    2025250    200200   17.7300  147.9400      11.4        10       933        98
VIS    2025250    200200   17.7300  147.9100      10.3        17       892        99
VIS    2025250    200200   17.7200  147.9100      10.4        19       861        98
VIS    2025250    200200   17.7200  147.8600       9.9        34       831        97
VIS    2025250    200200   17.7300  147.8500      10.0        35       850        98
VIS    2025250    200200   17.7300  147.8300      10.9        25       883        99
VIS    2025250    200200   17.7100  147.7900      11.1        10       920        98
VIS    2025250    200200   17.7300  147.7700      10.7        20       924        96
VIS    2025250    200200   17.7200  147.7400      10.7        30       880        95
VIS    2025250    200200   17.7100  147.7300      10.9        27       842        97
VIS    2025250    200200   17.7200  147.6900      10.6        21       820        96
VIS    2025250    200200   17.7200  147.6700      10.5        24       815        96
VIS    2025250    200200   17.7100  147.6600      10.7        24       815        96
VIS    2025250    200200   17.7200  147.6200      11.1        30       800        94
VIS    2025250    200200   17.7200  147.6100      10.9        29       800        95
VIS    2025250    200200   17.7200  147.5600      11.6        16       802        90
VIS    2025250    200200   17.7100  147.5300      10.6        20       854        94
VIS    2025250    200200   17.7200  147.5100      10.1        32       821        99
VIS    2025250    200200   17.7200  147.4900      10.0        32       790        92
VIS    2025250    200200   17.7000  145.3400       4.5       270       179        90
VIS    2025250    200200   17.7000  145.3000       6.5       265       180        90
VIS    2025250    200200   17.7000  145.2600       6.7       262       179        90
VIS    2025250    200200   17.7000  144.9100       7.2       204       155        90
VIS    2025250    200200   17.7500  151.5500       7.8        55       981        90
VIS    2025250    200200   17.7100  148.7700      10.3        40       958        90
VIS    2025250    200200   17.7100  148.7000      10.9        41       956        90
VIS    2025250    200200   17.6900  148.6700      11.0        41       950        91
VIS    2025250    200200   17.6900  148.6500      11.1        40       955        91
VIS    2025250    200200   17.6900  148.6200      10.4        30       950        96
VIS    2025250    200200   17.6900  148.5900      10.1        25       941        98
VIS    2025250    200200   17.6900  148.5900      10.1        26       941        97
VIS    2025250    200200   17.7000  148.5600      10.5        30       916        97
VIS    2025250    200200   17.6900  148.5200      10.1        26       911       100
VIS    2025250    200200   17.6900  148.5000       9.7        21       915        97
VIS    2025250    200200   17.6900  148.4900       9.7        19       913        97
VIS    2025250    200200   17.6900  148.4600       9.8        16       911        97
VIS    2025250    200200   17.7000  148.4200       9.4        16       937        99
VIS    2025250    200200   17.7000  148.4200       9.5        16       938        99
VIS    2025250    200200   17.7100  148.3800       9.3        15       941        97
VIS    2025250    200200   17.6900  148.3600       9.8        15       953        99
VIS    2025250    200200   17.6900  148.3300       9.8        19       931        99
VIS    2025250    200200   17.6900  148.3100       9.7        20       943        98
VIS    2025250    200200   17.6900  148.2800       9.9        18       929        99
VIS    2025250    200200   17.6900  148.2600      10.0        18       924        99
VIS    2025250    200200   17.6900  148.2400      10.4        16       921        99
VIS    2025250    200200   17.7000  148.2200      10.7        14       924        99
VIS    2025250    200200   17.6900  148.1900      10.7        14       924        99
VIS    2025250    200200   17.7000  148.1500      11.4        19       964        98
VIS    2025250    200200   17.7100  148.0800      12.4        10       973        95
VIS    2025250    200200   17.6900  148.0500      10.6        21       965        96
VIS    2025250    200200   17.6900  148.0500      10.2        22       956        96
VIS    2025250    200200   17.7000  148.0100      10.6        24       960        96
VIS    2025250    200200   17.7000  147.9700       9.6        21       953        97
VIS    2025250    200200   17.6800  147.9400      10.2        10       953        99
VIS    2025250    200200   17.6800  147.9100      11.1        11       873        94
VIS    2025250    200200   17.7000  147.8800      10.1        30       818        95
VIS    2025250    200200   17.6900  147.8500       9.3        42       811        96
VIS    2025250    200200   17.6900  147.8200      11.5        13       872        96
VIS    2025250    200200   17.7000  147.7900      11.2        10       891        96
VIS    2025250    200200   17.6800  147.7600      10.6        14       883        97
VIS    2025250    200200   17.7000  147.7500      10.6        21       886        99
VIS    2025250    200200   17.7000  147.7100      10.9        18       828        96
VIS    2025250    200200   17.7000  147.7100      11.0        16       824        95
VIS    2025250    200200   17.6800  147.6600      11.2        16       826        93
VIS    2025250    200200   17.6800  147.6600      11.1        17       826        94
VIS    2025250    200200   17.7000  147.6300      10.9        24       820        95
VIS    2025250    200200   17.7000  147.5300      10.6        19       854        96
VIS    2025250    200200   17.6900  147.5100       9.1        25       829        98
VIS    2025250    200200   17.6600  145.3400       6.3       281       187        90
VIS    2025250    200200   17.6800  148.6700      10.8        41       950        90
VIS    2025250    200200   17.6700  148.6600      10.5        41       950        91
VIS    2025250    200200   17.6700  148.6200      10.3        34       946        94
VIS    2025250    200200   17.6800  148.6000      10.2        28       942        97
VIS    2025250    200200   17.6900  148.5900      10.1        26       941        98
VIS    2025250    200200   17.6900  148.5600      10.5        32       922        96
VIS    2025250    200200   17.6700  148.5300      10.2        25       921        99
VIS    2025250    200200   17.6700  148.5100      10.0        23       929        97
VIS    2025250    200200   17.6800  148.4900       9.9        19       918        96
VIS    2025250    200200   17.6800  148.4700       9.8        17       926        93
VIS    2025250    200200   17.6800  148.4400       9.4        19       929        93
VIS    2025250    200200   17.6800  148.4200       9.3        18       937        92
VIS    2025250    200200   17.6800  148.4000       9.3        19       944        96
VIS    2025250    200200   17.6800  148.3600       9.8        16       953       100
VIS    2025250    200200   17.6800  148.3300       9.9        20       953        99
VIS    2025250    200200   17.6800  148.3200       9.9        20       951        98
VIS    2025250    200200   17.6800  148.2800       9.9        19       939        99
VIS    2025250    200200   17.6600  148.2600       9.7        19       939        99
VIS    2025250    200200   17.6800  148.2500      10.1        17       933        99
VIS    2025250    200200   17.6800  148.2100      10.7        12       924        98
VIS    2025250    200200   17.6800  148.1800      10.8        13       924        99
VIS    2025250    200200   17.6600  148.1600      10.5        12       929        98
VIS    2025250    200200   17.6700  148.1000      10.0        16       981        97
VIS    2025250    200200   17.6600  148.0400       9.7        21       940        95
VIS    2025250    200200   17.6600  148.0200      10.0        19       918        97
VIS    2025250    200200   17.6600  147.9800       9.6        14       914        98
VIS    2025250    200200   17.6800  147.9700       9.4        19       945        95
VIS    2025250    200200   17.6600  147.9500       9.7        10       945        96
VIS    2025250    200200   17.6800  147.9100      11.1        11       873        93
VIS    2025250    200200   17.6800  147.9100      11.1        12       864        92
VIS    2025250    200200   17.6600  147.8500      10.7        24       814        91
VIS    2025250    200200   17.6600  147.8200      10.9        23       849        97
VIS    2025250    200200   17.6700  147.8000      11.0        19       860        97
VIS    2025250    200200   17.6800  147.7600      10.7        14       878        97
VIS    2025250    200200   17.6800  147.7600      10.7        14       881        97
VIS    2025250    200200   17.6700  147.7300      11.2        15       881        98
VIS    2025250    200200   17.6800  147.6900      11.7        14       827        92
VIS    2025250    200200   17.6700  147.6800      11.9        14       826        92
VIS    2025250    200200   17.6700  147.6400      10.9        18       866        94
VIS    2025250    200200   17.6700  147.6400      10.7        19       866        94
VIS    2025250    200200   17.6700  147.5300      10.9        15       846        93
VIS    2025250    200200   17.6600  147.5100      10.7        12       842        96
VIS    2025250    200200   17.6700  147.4900       7.8        23       706        93
VIS    2025250    200200   17.6300  144.9600       7.0       187       158        97
VIS    2025250    200200   17.6500  144.9500       7.7       194       158        95
VIS    2025250    200200   17.6900  151.8000       9.0        44       993        91
VIS    2025250    200200   17.6600  148.6500      10.3        41       950        91
VIS    2025250    200200   17.6400  148.6200       9.9        31       946        95
VIS    2025250    200200   17.6400  148.6100      10.0        29       944        96
VIS    2025250    200200   17.6500  148.5700      10.2        25       933        98
VIS    2025250    200200   17.6600  148.5500      10.2        26       923        99
VIS    2025250    200200   17.6600  148.5200      10.3        24       923        99
VIS    2025250    200200   17.6600  148.5100      10.1        23       943        97
VIS    2025250    200200   17.6600  148.4800       9.6        21       955        94
VIS    2025250    200200   17.6500  148.4600       9.2        27       945        90
VIS    2025250    200200   17.6500  148.4300       9.8        27       922        96
VIS    2025250    200200   17.6500  148.4000       9.8        27       928        98
VIS    2025250    200200   17.6400  148.3900       9.5        31       928        97
VIS    2025250    200200   17.6500  148.3600       9.6        27       953        96
VIS    2025250    200200   17.6400  148.3300       9.9        23       953        94
VIS    2025250    200200   17.6500  148.3000       9.8        19       949        96
VIS    2025250    200200   17.6500  148.2800       9.7        20       939        99
VIS    2025250    200200   17.6400  148.2600       9.6        21       937       100
VIS    2025250    200200   17.6500  148.2400       9.7        16       934        98
VIS    2025250    200200   17.6500  148.2000      10.7        11       924        99
VIS    2025250    200200   17.6400  148.1900      10.7        10       929        98
VIS    2025250    200200   17.6600  148.1600      10.3        10       929        97
VIS    2025250    200200   17.6400  148.0800       9.4        14       989        90
VIS    2025250    200200   17.6400  148.0600       9.9        11       947        99
VIS    2025250    200200   17.6400  148.0400       9.9        14       940        99
VIS    2025250    200200   17.6400  148.0000       9.7        17       914        99
VIS    2025250    200200   17.6500  148.0000       9.6        17       914        99
VIS    2025250    200200   17.6500  147.9700       9.7        12       924        98
VIS    2025250    200200   17.6400  147.9500      10.6         7       948        99
VIS    2025250    200200   17.6400  147.9200      11.3         4       955        97
VIS    2025250    200200   17.6500  147.8900      10.6        14       864        95
VIS    2025250    200200   17.6500  147.8500      10.8        23       811        93
VIS    2025250    200200   17.6500  147.8200      10.6        26       849        98
VIS    2025250    200200   17.6400  147.7800      11.1        29       849        94
VIS    2025250    200200   17.6500  147.7700      10.7        26       854        97
VIS    2025250    200200   17.6500  147.7400      11.1        17       860        96
VIS    2025250    200200   17.6400  147.7200      11.3        22       862        98
VIS    2025250    200200   17.6300  147.6900      11.5        28       839        97
VIS    2025250    200200   17.6300  147.6700      11.2        22       821        94
VIS    2025250    200200   17.6500  147.6500      11.2        15       833        90
VIS    2025250    200200   17.6400  147.5800      13.5         5       893        92
VIS    2025250    200200   17.6500  147.5400      12.4        10       846        91
VIS    2025250    200200   17.6300  147.5200      12.4         9       842        92
VIS    2025250    200200   17.6500  147.5100      10.2        13       842        97
VIS    2025250    200200   17.6200  144.9800       6.4       191       163        95
VIS    2025250    200200   17.6300  144.9600       7.3       186       158        97
VIS    2025250    200200   17.6800  151.8000       8.2        48       995        94
VIS    2025250    200200   17.6800  151.7600       7.0        56       998        93
VIS    2025250    200200   17.6200  148.6900      10.8        39       977        90
VIS    2025250    200200   17.6400  148.6600      10.1        38       962        90
VIS    2025250    200200   17.6400  148.5700      10.5        20       941        98
VIS    2025250    200200   17.6300  148.5200      10.4        27       943        96
VIS    2025250    200200   17.6400  148.5100      10.3        27       947        95
VIS    2025250    200200   17.6200  148.4900       9.1        34       958        94
VIS    2025250    200200   17.6300  148.4600       9.0        35       933        95
VIS    2025250    200200   17.6300  148.4200      10.1        29       916        99
VIS    2025250    200200   17.6300  148.3900       9.7        29       926        98
VIS    2025250    200200   17.6200  148.3800       9.7        26       921        97
VIS    2025250    200200   17.6200  148.3200      10.5        16       918        94
VIS    2025250    200200   17.6200  148.3100      10.8        14       916        95
VIS    2025250    200200   17.6300  148.2800      10.0        19       918        99
VIS    2025250    200200   17.6100  148.2500       9.3        22       927       100
VIS    2025250    200200   17.6300  148.2300       9.6        17       937        98
VIS    2025250    200200   17.6200  148.2100       9.8        14       944        98
VIS    2025250    200200   17.6300  148.1900      10.6        11       929        98
VIS    2025250    200200   17.6200  148.1500       9.9         8       947        96
VIS    2025250    200200   17.6100  148.1400       9.9         8       958        97
VIS    2025250    200200   17.6200  148.0600       9.5         9       947        97
VIS    2025250    200200   17.6200  148.0300       9.8        12       922        97
VIS    2025250    200200   17.6100  148.0200       9.9        14       915        98
VIS    2025250    200200   17.6200  147.9700      10.4        14       915        99
VIS    2025250    200200   17.6200  147.9700      10.5        13       915        99
VIS    2025250    200200   17.6300  147.9500      10.8         9       948        99
VIS    2025250    200200   17.6300  147.9200      11.4         5       952        97
VIS    2025250    200200   17.6200  147.9000      11.8         8       879        93
VIS    2025250    200200   17.6100  147.8700      11.0        14       818        90
VIS    2025250    200200   17.6200  147.8300      10.3        18       826        94
VIS    2025250    200200   17.6100  147.8200      10.4        16       826        94
VIS    2025250    200200   17.6200  147.8000      10.3        25       836        95
VIS    2025250    200200   17.6200  147.7500      10.9        33       854        96
VIS    2025250    200200   17.6100  147.7400      10.8        35       857        95
VIS    2025250    200200   17.6300  147.7100      11.5        28       850        97
VIS    2025250    200200   17.6200  147.6800      11.2        27       837        98
VIS    2025250    200200   17.6200  147.6600      11.1        17       821        93
VIS    2025250    200200   17.6100  147.6300      12.2        10       836        92
VIS    2025250    200200   17.6200  147.6100      12.0        10       896        98
VIS    2025250    200200   17.6100  147.6000      12.0         8       902        98
VIS    2025250    200200   17.6300  147.5600      13.0         6       868        93
VIS    2025250    200200   17.6200  147.5500      12.5         7       856        91
VIS    2025250    200200   17.6300  147.5200      12.4         9       842        92
VIS    2025250    200200   17.5900  145.0600       4.1       185       161        90
VIS    2025250    200200   17.5900  145.0300       6.1       191       161        97
VIS    2025250    200200   17.6000  145.0200       6.0       195       165        96
VIS    2025250    200200   17.5900  148.6900      10.1        42       977        90
VIS    2025250    200200   17.5900  148.6500      10.5        38       974        91
VIS    2025250    200200   17.6100  148.5400      10.7        24       938        96
VIS    2025250    200200   17.6000  148.5200      10.4        30       968        92
VIS    2025250    200200   17.6100  148.4700       9.0        35       958        93
VIS    2025250    200200   17.6100  148.4700       8.9        36       955        93
VIS    2025250    200200   17.6100  148.4400       9.7        33       921        97
VIS    2025250    200200   17.6100  148.4100      10.1        26       916       100
VIS    2025250    200200   17.6100  148.3800       9.7        25       917        96
VIS    2025250    200200   17.6100  148.3500       9.9        23       918        94
VIS    2025250    200200   17.6100  148.3400      10.3        19       918        94
VIS    2025250    200200   17.5900  148.3100      10.9        15       910        96
VIS    2025250    200200   17.5900  148.3000      10.7        16       908        97
VIS    2025250    200200   17.6100  148.2500       9.2        22       915       100
VIS    2025250    200200   17.5900  148.2300       9.4        14       947        96
VIS    2025250    200200   17.6100  148.2200       9.5        14       947        97
VIS    2025250    200200   17.6100  148.1900      10.2        14       940        97
VIS    2025250    200200   17.6000  148.1600      10.0        19       947        98
VIS    2025250    200200   17.6100  148.1300       9.9         4       972        97
VIS    2025250    200200   17.6100  148.0900      10.1         6       972        98
VIS    2025250    200200   17.6100  148.0600       9.6         8       947        96
VIS    2025250    200200   17.6000  148.0500       9.7         7       942        94
VIS    2025250    200200   17.6100  148.0300       9.8        11       922        96
VIS    2025250    200200   17.6000  147.9800      10.6        15       897        99
VIS    2025250    200200   17.6100  147.9700      10.6        14       907        99
VIS    2025250    200200   17.6000  147.9400      10.7        15       928       100
VIS    2025250    200200   17.5900  147.9300      11.1        14       928       100
VIS    2025250    200200   17.6000  147.9000      11.7        11       901        98
VIS    2025250    200200   17.6000  147.8600      10.8        15       818        90
VIS    2025250    200200   17.6000  147.8500      10.2        16       826        93
VIS    2025250    200200   17.6100  147.8200      10.4        14       833        94
VIS    2025250    200200   17.5900  147.8000      10.7        16       852        95
VIS    2025250    200200   17.6000  147.7700      10.6        34       836        96
VIS    2025250    200200   17.6000  147.7400      10.9        36       857        95
VIS    2025250    200200   17.6000  147.7200      11.1        36       860        95
VIS    2025250    200200   17.5900  147.6900      11.2        33       853        96
VIS    2025250    200200   17.5900  147.6800      11.2        31       839        97
VIS    2025250    200200   17.5800  147.6400      11.4        11       830        93
VIS    2025250    200200   17.5800  147.6100      11.1        10       873        98
VIS    2025250    200200   17.5800  147.6000      11.1         9       896        98
VIS    2025250    200200   17.5900  147.5800      11.1         8       914        97
VIS    2025250    200200   17.5800  147.5400      10.6        13       837        90
VIS    2025250    200200   17.5900  147.5200      10.8        12       824        90
VIS    2025250    200200   17.6000  147.5000      11.5        10       821        90
VIS    2025250    200200   17.5900  147.3900      10.7        21       782        92
VIS    2025250    200200   17.5600  145.0600       6.4       187       161        90
VIS    2025250    200200   17.5800  145.0300       6.8       189       160        95
VIS    2025250    200200   17.5700  148.6500      10.2        38       974        91
VIS    2025250    200200   17.5800  148.6300      10.9        39       977        90
VIS    2025250    200200   17.5700  148.6100      11.0        39       985        90
VIS    2025250    200200   17.5700  148.5600       9.6        32       989        92
VIS    2025250    200200   17.5700  148.5000       9.9        34       987        90
VIS    2025250    200200   17.5800  148.4700       9.6        33       983        92
VIS    2025250    200200   17.5800  148.4500       9.3        30       955        94
VIS    2025250    200200   17.5800  148.4400       9.3        30       937        97
VIS    2025250    200200   17.5800  148.4200       9.4        25       917       100
VIS    2025250    200200   17.5700  148.3700       9.5        28       916        98
VIS    2025250    200200   17.5800  148.3500      10.2        21       911        93
VIS    2025250    200200   17.5800  148.3300      10.4        21       906        94
VIS    2025250    200200   17.5900  148.3100      10.8        16       910        97
VIS    2025250    200200   17.5800  148.2800      10.2        19       907        99
VIS    2025250    200200   17.5900  148.2500       9.4        21       910        99
VIS    2025250    200200   17.5700  148.2300       9.8        13       950        98
VIS    2025250    200200   17.5700  148.2200       9.8        11       964        97
VIS    2025250    200200   17.5600  148.1800       9.9        13       973        97
VIS    2025250    200200   17.5600  148.1600       9.8        23       947        97
VIS    2025250    200200   17.5800  148.1400       9.4        15       950        98
VIS    2025250    200200   17.5700  148.1200       9.6         6       962        98
VIS    2025250    200200   17.5800  148.0100      10.2        10       905        95
VIS    2025250    200200   17.5800  148.0000      10.4        11       897        96
VIS    2025250    200200   17.5700  147.9800      10.4        15       896        99
VIS    2025250    200200   17.5700  147.9300      11.0        14       907        99
VIS    2025250    200200   17.5700  147.9100      11.4        10       908        98
VIS    2025250    200200   17.5700  147.9000      11.5        10       905        98
VIS    2025250    200200   17.5600  147.8200      11.4        13       842        91
VIS    2025250    200200   17.5700  147.8000      11.6        14       852        93
VIS    2025250    200200   17.5600  147.7700      10.2        19       852        97
VIS    2025250    200200   17.5600  147.7400      10.2        20       816        96
VIS    2025250    200200   17.5600  147.7200      10.7        22       820        96
VIS    2025250    200200   17.5700  147.7000      10.6        29       824        98
VIS    2025250    200200   17.5700  147.6800      10.7        29       826        98
VIS    2025250    200200   17.5600  147.6500      10.8        21       817        94
VIS    2025250    200200   17.5800  147.6100      11.1        10       873        98
VIS    2025250    200200   17.5700  147.6100      11.2         9       873        97
VIS    2025250    200200   17.5600  147.5800      12.0         6       873        96
VIS    2025250    200200   17.5700  147.5400      10.5        11       852        96
VIS    2025250    200200   17.5700  147.5200       9.8        13       820        91
VIS    2025250    200200   17.5800  147.4800      10.1         5       816        90
VIS    2025250    200200   17.5500  148.8700      10.2        25       969        93
VIS    2025250    200200   17.5700  148.8500      10.1        27       970        94
VIS    2025250    200200   17.5600  148.6500      10.3        38       974        91
VIS    2025250    200200   17.5600  148.6200      11.0        39       981        90
VIS    2025250    200200   17.5500  148.5400      10.0        28       992        92
VIS    2025250    200200   17.5600  148.5000      10.1        36       992        91
VIS    2025250    200200   17.5600  148.4800       9.8        35       983        92
VIS    2025250    200200   17.5600  148.4400       9.2        25       950        97
VIS    2025250    200200   17.5400  148.4200       9.3        23       934        98
VIS    2025250    200200   17.5600  148.3900       9.4        23       917        99
VIS    2025250    200200   17.5600  148.3700       9.4        28       916        98
VIS    2025250    200200   17.5500  148.3600       9.2        27       916        97
VIS    2025250    200200   17.5400  148.3400       9.6        22       908        94
VIS    2025250    200200   17.5600  148.2900      10.3        20       907        98
VIS    2025250    200200   17.5600  148.2900      10.1        20       907        97
VIS    2025250    200200   17.5400  148.2400       9.7        14       919        99
VIS    2025250    200200   17.5600  148.2200       9.8        11       973        98
VIS    2025250    200200   17.5500  148.2100       9.8        10       984        97
VIS    2025250    200200   17.5600  148.1800      10.0        12       981        97
VIS    2025250    200200   17.5600  148.1500       9.9        22       947        97
VIS    2025250    200200   17.5500  148.1400      10.2        19       956        97
VIS    2025250    200200   17.5500  148.1000      10.0       360       981        96
VIS    2025250    200200   17.5600  148.0900       9.8       358       981        94
VIS    2025250    200200   17.5600  148.0000       9.1         7       962        94
VIS    2025250    200200   17.5400  147.9800      10.1         9       904        95
VIS    2025250    200200   17.5500  147.9600      10.6        13       886        99
VIS    2025250    200200   17.5500  147.9300      10.6        12       905        99
VIS    2025250    200200   17.5400  147.9000      10.7         7       908        96
VIS    2025250    200200   17.5400  147.8900      10.7         6       908        96
VIS    2025250    200200   17.5400  147.8000      11.0        14       845        95
VIS    2025250    200200   17.5500  147.7800      10.8        14       861        96
VIS    2025250    200200   17.5500  147.7700      10.5        17       861        97
VIS    2025250    200200   17.5500  147.7500      10.1        20       816        94
VIS    2025250    200200   17.5600  147.7100      10.8        22       820        96
VIS    2025250    200200   17.5400  147.6800      10.6        29       813        97
VIS    2025250    200200   17.5500  147.6600      10.7        25       805        93
VIS    2025250    200200   17.5500  147.6500      10.7        25       795        93
VIS    2025250    200200   17.5500  147.5800      11.9         6       852        93
VIS    2025250    200200   17.5500  147.5800      11.7         6       852        94
VIS    2025250    200200   17.5500  147.5500      10.2         6       832        93
VIS    2025250    200200   17.5300  148.8500       9.7        25       957        97
VIS    2025250    200200   17.5200  148.8400      10.0        23       957        98
VIS    2025250    200200   17.5400  148.8100       9.7        24       957        93
VIS    2025250    200200   17.5200  148.7900      10.0        26       954        94
VIS    2025250    200200   17.5200  148.4900       9.5        34       990        92
VIS    2025250    200200   17.5400  148.4500       9.2        31       963        95
VIS    2025250    200200   17.5400  148.4200       9.3        24       950        97
VIS    2025250    200200   17.5400  148.4000       9.6        22       932        99
VIS    2025250    200200   17.5300  148.3900       9.3        26       932        98
VIS    2025250    200200   17.5400  148.3600       9.2        27       916        97
VIS    2025250    200200   17.5200  148.3300       9.8        19       926        99
VIS    2025250    200200   17.5400  148.3200      10.4        16       906        93
VIS    2025250    200200   17.5200  148.2300       9.9         9       963        93
VIS    2025250    200200   17.5400  148.2200       9.8         9       984        95
VIS    2025250    200200   17.5300  148.1800      10.6        12       953        99
VIS    2025250    200200   17.5200  148.1600      10.9        15       952        99
VIS    2025250    200200   17.5300  148.1400      11.1        15       947        99
VIS    2025250    200200   17.5200  148.1100      10.9        11       944        99
VIS    2025250    200200   17.5300  148.0900      10.2         3       969        99
VIS    2025250    200200   17.5100  148.0700      10.1         5       960        99
VIS    2025250    200200   17.5300  147.9800       9.8         7       904        93
VIS    2025250    200200   17.5300  147.9600      10.8        10       897        97
VIS    2025250    200200   17.5300  147.9400      10.7        10       904        97
VIS    2025250    200200   17.5300  147.9200      10.5         9       905        97
VIS    2025250    200200   17.5300  147.9000      10.6         7       910        96
VIS    2025250    200200   17.5200  147.8800      10.5         5       911        96
VIS    2025250    200200   17.5300  147.8500       9.8        12       877        98
VIS    2025250    200200   17.5200  147.8100       9.3        23       830        98
VIS    2025250    200200   17.5200  147.8000       9.7        22       831        97
VIS    2025250    200200   17.5300  147.7800      10.3        17       861        98
VIS    2025250    200200   17.5100  147.7400      10.4        30       860        97
VIS    2025250    200200   17.5300  147.7200      10.3        28       836        99
VIS    2025250    200200   17.5300  147.6900      10.5        30       824        98
VIS    2025250    200200   17.5200  147.6800      11.0        32       808        96
VIS    2025250    200200   17.5100  147.6500      11.3        29       795        94
VIS    2025250    200200   17.5100  147.6100      10.1        21       798        94
VIS    2025250    200200   17.5100  147.6100       9.9        20       798        94
VIS    2025250    200200   17.5300  147.3500      10.6        15       830        92
VIS    2025250    200200   17.5200  147.3400      10.5        16       829        95
VIS    2025250    200200   17.5300  150.4700       8.0        33       997        97
VIS    2025250    200200   17.5100  148.9200       9.0        17       980        97
VIS    2025250    200200   17.5000  148.8700       8.6        42       962        91
VIS    2025250    200200   17.5000  148.8600       8.5        43       954        90
VIS    2025250    200200   17.5200  148.8300       9.6        26       957        97
VIS    2025250    200200   17.5100  148.8100       9.3        25       954        97
VIS    2025250    200200   17.4900  148.4100       9.6        23       975        94
VIS    2025250    200200   17.4900  148.3900       9.4        24       975        95
VIS    2025250    200200   17.4900  148.3700       9.5        26       968        96
VIS    2025250    200200   17.5100  148.3500       9.8        24       937        99
VIS    2025250    200200   17.5000  148.3200       9.3        19       931        99
VIS    2025250    200200   17.5000  148.2200      10.3         8       983        91
VIS    2025250    200200   17.4900  148.1900      10.6        13       965        99
VIS    2025250    200200   17.5100  148.1600      10.8        14       952        99
VIS    2025250    200200   17.5100  148.1400      11.3        12       940        99
VIS    2025250    200200   17.4900  148.1100      10.9        11       929        99
VIS    2025250    200200   17.4900  148.1100      10.8        11       929        99
VIS    2025250    200200   17.5000  148.0700      10.1         8       958        99
VIS    2025250    200200   17.4900  148.0600      10.1        12       944        99
VIS    2025250    200200   17.4900  148.0100       9.1         5       959        94
VIS    2025250    200200   17.4900  148.0000       9.2       359       959        93
VIS    2025250    200200   17.5100  147.9700      11.0         4       904        96
VIS    2025250    200200   17.4900  147.9600      10.7         2       904        95
VIS    2025250    200200   17.4900  147.9300      10.1         4       896        95
VIS    2025250    200200   17.5000  147.8900      10.7         6       920        97
VIS    2025250    200200   17.5000  147.8900      10.7         6       927        97
VIS    2025250    200200   17.5000  147.8600      10.3         6       903        94
VIS    2025250    200200   17.5000  147.8200       9.1        23       842        96
VIS    2025250    200200   17.4900  147.8100       9.1        25       831        97
VIS    2025250    200200   17.5100  147.7800      10.2        20       860        96
VIS    2025250    200200   17.5000  147.7500      10.1        30       860        96
VIS    2025250    200200   17.4900  147.7200       9.5        39       852        95
VIS    2025250    200200   17.5000  147.7200       9.9        38       845        96
VIS    2025250    200200   17.5000  147.6800      10.9        33       837        97
VIS    2025250    200200   17.4900  147.6500      11.4        23       837        97
VIS    2025250    200200   17.5000  147.6200      10.7        22       808        94
VIS    2025250    200200   17.5000  147.6200      10.5        21       808        95
VIS    2025250    200200   17.4900  147.5900      10.0        17       798        92
VIS    2025250    200200   17.4700  148.9400       9.2        10       994       100
VIS    2025250    200200   17.4900  148.9100       9.1        16       973        96
VIS    2025250    200200   17.4800  148.8800       8.6        33       962        93
VIS    2025250    200200   17.4700  148.8700       8.8        34       953        95
VIS    2025250    200200   17.4700  148.8400       8.6        34       941        96
VIS    2025250    200200   17.4700  148.8200       8.5        31       951        96
VIS    2025250    200200   17.4800  148.8000       8.9        29       954        97
VIS    2025250    200200   17.4800  148.7700      10.0        23       959        97
VIS    2025250    200200   17.4900  148.3800       9.4        23       975        96
VIS    2025250    200200   17.4900  148.2100      10.5        10       971        93
VIS    2025250    200200   17.4900  148.2000      10.6        13       965        97
VIS    2025250    200200   17.4700  148.1700      10.5         8       958        98
VIS    2025250    200200   17.4900  148.1400      10.9        10       937        99
VIS    2025250    200200   17.4900  148.1100      10.9        12       929        99
VIS    2025250    200200   17.4700  148.1000      11.2        11       925        99
VIS    2025250    200200   17.4700  148.0800      10.6         9       927        99
VIS    2025250    200200   17.4800  148.0400       9.9        13       940        98
VIS    2025250    200200   17.4700  148.0100       9.6         7       950        97
VIS    2025250    200200   17.4600  148.0000       9.6         3       931        96
VIS    2025250    200200   17.4600  147.9800      10.1         2       963        98
VIS    2025250    200200   17.4800  147.9500      10.4         0       922        95
VIS    2025250    200200   17.4700  147.9300       9.3       358       893        93
VIS    2025250    200200   17.4700  147.8900       9.7         0       920        94
VIS    2025250    200200   17.4600  147.8800       9.6         1       942        95
VIS    2025250    200200   17.4800  147.8600      10.3         6       907        94
VIS    2025250    200200   17.4600  147.8200       9.9        18       868        99
VIS    2025250    200200   17.4700  147.7900       9.5        28       831        98
VIS    2025250    200200   17.4600  147.7900       9.2        32       821        91
VIS    2025250    200200   17.4600  147.7500       9.3        33       845        96
VIS    2025250    200200   17.4700  147.7200       9.1        37       828        98
VIS    2025250    200200   17.4800  147.7100       9.2        39       828        98
VIS    2025250    200200   17.4600  147.6800      10.4        33       849        97
VIS    2025250    200200   17.4800  147.6500      11.4        21       843        96
VIS    2025250    200200   17.4800  147.5800      10.1        12       796        90
VIS    2025250    200200   17.4900  151.4400       8.1        52       989        95
VIS    2025250    200200   17.4500  148.9500       9.4        13       994        99
VIS    2025250    200200   17.4600  148.9300       9.1        13       982        98
VIS    2025250    200200   17.4700  148.9100       9.2        16       973        98
VIS    2025250    200200   17.4500  148.8700       8.9        27       953        98
VIS    2025250    200200   17.4500  148.8700       8.9        27       953        98
VIS    2025250    200200   17.4600  148.8300       8.7        32       934        98
VIS    2025250    200200   17.4600  148.8100       8.7        31       938        98
VIS    2025250    200200   17.4500  148.7700       9.5        22       954        99
VIS    2025250    200200   17.4600  148.7500       9.5        22       963        98
VIS    2025250    200200   17.4500  148.7400       9.4        24       963        98
VIS    2025250    200200   17.4600  148.2000      10.6         8       972        98
VIS    2025250    200200   17.4600  148.1600      10.5         6       953        98
VIS    2025250    200200   17.4600  148.1500      10.3         7       937        98
VIS    2025250    200200   17.4600  148.1300      10.3         8       921        96
VIS    2025250    200200   17.4600  148.0900      11.2         9       924        99
VIS    2025250    200200   17.4500  148.0600      10.3         9       917        98
VIS    2025250    200200   17.4500  148.0600      10.1        10       917        98
VIS    2025250    200200   17.4400  148.0300       9.9         9       917        98
VIS    2025250    200200   17.4400  148.0100      10.1         7       921        97
VIS    2025250    200200   17.4500  147.9700      10.1         3       953        98
VIS    2025250    200200   17.4400  147.9600      10.0         2       953        97
VIS    2025250    200200   17.4500  147.9300       8.7       352       932        91
VIS    2025250    200200   17.4400  147.9100       8.2       349       905        90
VIS    2025250    200200   17.4500  147.8800       9.1       358       907        92
VIS    2025250    200200   17.4400  147.8600       9.8         5       907        96
VIS    2025250    200200   17.4400  147.8200      10.4        15       868        98
VIS    2025250    200200   17.4500  147.8000       9.7        25       828        95
VIS    2025250    200200   17.4600  147.7700       9.3        33       842        90
VIS    2025250    200200   17.4600  147.7300       9.3        33       852        97
VIS    2025250    200200   17.4400  147.7100       9.8        29       849        98
VIS    2025250    200200   17.4600  147.6700      10.7        32       849        97
VIS    2025250    200200   17.4500  147.6700      11.0        30       849        97
VIS    2025250    200200   17.4500  147.6400      11.8        16       849        94
VIS    2025250    200200   17.4400  147.4400       4.5        19       709        91
VIS    2025250    200200   17.4300  148.9200       9.1        22       977        94
VIS    2025250    200200   17.4300  148.8900       9.1        18       960       100
VIS    2025250    200200   17.4400  148.8600       8.9        27       946        98
VIS    2025250    200200   17.4400  148.8500       8.8        28       936        99
VIS    2025250    200200   17.4400  148.8200       9.0        28       934        98
VIS    2025250    200200   17.4400  148.8000       9.2        26       939        99
VIS    2025250    200200   17.4400  148.2000      10.9         8       976        99
VIS    2025250    200200   17.4300  148.1900      11.0         7       972       100
VIS    2025250    200200   17.4200  148.1600      10.7         4       931        97
VIS    2025250    200200   17.4200  148.1300       9.7         7       910        96
VIS    2025250    200200   17.4200  148.1200       9.7         7       907        97
VIS    2025250    200200   17.4200  148.0900       9.7        10       905        97
VIS    2025250    200200   17.4400  148.0700      10.3         8       914        97
VIS    2025250    200200   17.4400  148.0300       9.9         8       914        97
VIS    2025250    200200   17.4400  148.0100      10.1         6       921        97
VIS    2025250    200200   17.4300  147.9900       9.9         4       927        96
VIS    2025250    200200   17.4300  147.9700      10.0         3       932        96
VIS    2025250    200200   17.4400  147.9500      10.0         1       973        99
VIS    2025250    200200   17.4300  147.9100       8.3       349       905        90
VIS    2025250    200200   17.4300  147.8900       8.4       351       905        90
VIS    2025250    200200   17.4200  147.8700       8.8       359       905        93
VIS    2025250    200200   17.4300  147.8300      10.1        13       881        98
VIS    2025250    200200   17.4300  147.8300      10.1        14       868        98
VIS    2025250    200200   17.4200  147.7400       9.7        26       821        97
VIS    2025250    200200   17.4100  147.7100      10.1        21       886        98
VIS    2025250    200200   17.4300  147.6900      10.3        25       849        99
VIS    2025250    200200   17.4300  147.6800      10.5        27       849        98
VIS    2025250    200200   17.4300  147.6500      11.3        22       849        95
VIS    2025250    200200   17.4100  147.6300      10.8        18       820        93
VIS    2025250    200200   17.4200  148.9000       8.9        19       973        98
VIS    2025250    200200   17.4100  148.8800       9.3        18       960        99
VIS    2025250    200200   17.4200  148.8500       9.1        28       940        98
VIS    2025250    200200   17.4100  148.8200       9.1        30       939        96
VIS    2025250    200200   17.4000  148.6600       9.2        28       991        93
VIS    2025250    200200   17.4100  148.1700      10.9        10       972       100
VIS    2025250    200200   17.4000  148.1600      10.8        10       962       100
VIS    2025250    200200   17.4000  148.1300      10.2         6       911        97
VIS    2025250    200200   17.4100  148.1100       9.7        10       905        97
VIS    2025250    200200   17.4100  148.0900       9.6        10       905        97
VIS    2025250    200200   17.4000  148.0500       9.4         8       911        97
VIS    2025250    200200   17.4100  148.0500       9.6         8       910        96
VIS    2025250    200200   17.4100  148.0000       9.8         5       914        95
VIS    2025250    200200   17.4100  148.0000       9.8         5       921        95
VIS    2025250    200200   17.4100  147.9700       9.8         4       921        96
VIS    2025250    200200   17.3900  147.9500      10.7         7       932        98
VIS    2025250    200200   17.4100  147.9200      10.3         3       969        99
VIS    2025250    200200   17.4100  147.8900       9.0       357       924        93
VIS    2025250    200200   17.4000  147.8600      10.3         1       894        92
VIS    2025250    200200   17.4000  147.8300       9.8         5       860        94
VIS    2025250    200200   17.4000  147.8200       9.4         2       828        90
VIS    2025250    200200   17.4100  147.7300       9.9        24       818        97
VIS    2025250    200200   17.4000  147.7300       9.9        24       818        98
VIS    2025250    200200   17.3900  147.6800      10.4        10       922        97
VIS    2025250    200200   17.3900  147.6700      10.6         8       896        98
VIS    2025250    200200   17.4100  147.6400      10.5        18       832        97
VIS    2025250    200200   17.4100  147.6200      10.6        17       809        93
VIS    2025250    200200   17.3900  147.5900       9.5        18       795        93
VIS    2025250    200200   17.3900  147.5800       8.9        16       792        92
VIS    2025250    200200   17.3800  148.9100      10.1        30       980        93
VIS    2025250    200200   17.3900  148.9000       9.6        16       973        99
VIS    2025250    200200   17.3800  148.8700       9.5        22       952        99
VIS    2025250    200200   17.4000  148.8300       9.4        34       939        95
VIS    2025250    200200   17.3900  148.8300       9.4        35       939        95
VIS    2025250    200200   17.3800  148.7500       8.4        20       970        92
VIS    2025250    200200   17.3900  148.7100       9.4        35       995        92
VIS    2025250    200200   17.3700  148.6700       9.0        30       984        92
VIS    2025250    200200   17.3700  148.6500       9.3        27       984        93
VIS    2025250    200200   17.3800  148.6300       9.7        23       984        97
VIS    2025250    200200   17.3700  148.6000       9.4        25       982        96
VIS    2025250    200200   17.3800  148.1600      10.6        12       962        99
VIS    2025250    200200   17.3700  148.1400      10.3         8       960        99
VIS    2025250    200200   17.3700  148.1300      10.2         8       960        99
VIS    2025250    200200   17.3800  148.0900       9.6        19       913        97
VIS    2025250    200200   17.3800  148.0600       9.8        13       914        98
VIS    2025250    200200   17.3800  148.0600       9.9        12       918        97
VIS    2025250    200200   17.3800  148.0200       9.8        10       914        97
VIS    2025250    200200   17.3700  148.0000       9.9        10       910        98
VIS    2025250    200200   17.3700  147.9800      10.0        12       905        98
VIS    2025250    200200   17.3900  147.9400      10.9         8       932        99
VIS    2025250    200200   17.3700  147.9200      10.3        10       913        98
VIS    2025250    200200   17.3700  147.9000       9.8         9       908        97
VIS    2025250    200200   17.3800  147.8800       9.7        10       897        97
VIS    2025250    200200   17.3700  147.8600      11.3         6       893        95
VIS    2025250    200200   17.3700  147.7200       9.7        21       807        95
VIS    2025250    200200   17.3700  147.7100      10.0        24       813        97
VIS    2025250    200200   17.3800  147.6900       9.9        18       886        99
VIS    2025250    200200   17.3700  147.6600       9.9        12       886        98
VIS    2025250    200200   17.3700  147.6300       9.5        22       865        99
VIS    2025250    200200   17.3600  147.6100       9.8        26       817        99
VIS    2025250    200200   17.3800  147.5800       8.9        18       795        93
VIS    2025250    200200   17.3700  150.4600       8.6        28      1000        94
VIS    2025250    200200   17.3600  148.9100       9.6        32       992        91
VIS    2025250    200200   17.3600  148.8800       9.6        21       969        98
VIS    2025250    200200   17.3600  148.8500       9.3        25       947        98
VIS    2025250    200200   17.3500  148.8300       9.2        29       940        98
VIS    2025250    200200   17.3600  148.8000       9.2        27       934        98
VIS    2025250    200200   17.3700  148.7900       8.8        24       966        96
VIS    2025250    200200   17.3700  148.7800       8.4        25       966        96
VIS    2025250    200200   17.3500  148.7400       7.8        14       979        90
VIS    2025250    200200   17.3600  148.6600       9.1        26       984        94
VIS    2025250    200200   17.3600  148.6500       9.2        26       984        95
VIS    2025250    200200   17.3500  148.6100       9.3        27       970        96
VIS    2025250    200200   17.3500  148.5900       9.3        26       957        97
VIS    2025250    200200   17.3500  148.1600       9.6         8       972        98
VIS    2025250    200200   17.3500  148.1300       9.7         8       960        98
VIS    2025250    200200   17.3400  148.1200       9.9        10       925        97
VIS    2025250    200200   17.3600  148.0800       9.7        20       915        97
VIS    2025250    200200   17.3600  148.0500      10.2        11       918        96
VIS    2025250    200200   17.3500  148.0500      10.2        11       918        97
VIS    2025250    200200   17.3400  148.0000      10.6        11       914        98
VIS    2025250    200200   17.3400  147.9800      10.7        13       914        99
VIS    2025250    200200   17.3400  147.9600      10.7        14       913        99
VIS    2025250    200200   17.3600  147.9500      10.7        14       905        99
VIS    2025250    200200   17.3600  147.9200      10.0        11       908        98
VIS    2025250    200200   17.3600  147.9000       9.6         9       897        96
VIS    2025250    200200   17.3600  147.8600      11.4         7       893        96
VIS    2025250    200200   17.3500  147.8500      11.7         6       893        95
VIS    2025250    200200   17.3400  147.8200      11.4         3       870        93
VIS    2025250    200200   17.3400  147.7100       9.5        13       837        96
VIS    2025250    200200   17.3400  147.6900       9.4        19       847        99
VIS    2025250    200200   17.3400  147.6700       9.3        25       862        99
VIS    2025250    200200   17.3600  147.6500       9.3        20       868        99
VIS    2025250    200200   17.3600  147.6100       9.8        25       817        99
VIS    2025250    200200   17.3400  147.5900       9.8        25       798        96
VIS    2025250    200200   17.3400  147.5800       9.6        24       795        94
VIS    2025250    200200   17.3500  150.3400       8.2        19       985        92
VIS    2025250    200200   17.3400  148.8700       9.4        22       960        98
VIS    2025250    200200   17.3400  148.8600       9.2        24       952        98
VIS    2025250    200200   17.3500  148.8200       9.2        28       934        98
VIS    2025250    200200   17.3400  148.8000       9.1        29       934        96
VIS    2025250    200200   17.3300  148.7700       8.9        34       934        91
VIS    2025250    200200   17.3400  148.6300       9.1        27       977        95
VIS    2025250    200200   17.3400  148.6000       9.5        24       953        97
VIS    2025250    200200   17.3400  148.5800       9.4        24       957        98
VIS    2025250    200200   17.3200  148.1600       9.4        10       972        95
VIS    2025250    200200   17.3400  148.1500       9.2         7       972        98
VIS    2025250    200200   17.3400  148.1100      10.1        11       922        97
VIS    2025250    200200   17.3200  148.0800      10.0        18       913        99
VIS    2025250    200200   17.3200  148.0700      10.1        16       910        99
VIS    2025250    200200   17.3200  148.0500      10.0        13       914        98
VIS    2025250    200200   17.3300  148.0100      10.4         9       914        98
VIS    2025250    200200   17.3300  147.9800      10.8        12       915        99
VIS    2025250    200200   17.3300  147.9800      10.7        12       915        98
VIS    2025250    200200   17.3200  147.9500      10.3        12       913        97
VIS    2025250    200200   17.3300  147.9200      10.1        12       905        97
VIS    2025250    200200   17.3400  147.8900       9.5         4       893        92
VIS    2025250    200200   17.3300  147.8800       9.6         3       893        93
VIS    2025250    200200   17.3300  147.8400      11.3         9       903        98
VIS    2025250    200200   17.3400  147.8100      11.0         4       870        93
VIS    2025250    200200   17.3300  147.8000      10.2         4       828        90
VIS    2025250    200200   17.3200  147.6900       9.1         9       846        95
VIS    2025250    200200   17.3300  147.6600       9.3        21       876        98
VIS    2025250    200200   17.3300  147.6600       9.4        18       876        99
VIS    2025250    200200   17.3100  147.6300      10.6        10       873        98
VIS    2025250    200200   17.3300  147.6100       9.8        16       829        97
VIS    2025250    200200   17.3200  147.5900       9.8        21       808        96
VIS    2025250    200200   17.3000  148.8600       9.3        13       970        99
VIS    2025250    200200   17.3200  148.8500       9.7        23       949        96
VIS    2025250    200200   17.3200  148.8200       9.4        29       939        95
VIS    2025250    200200   17.3100  148.7900       9.3        33       934        94
VIS    2025250    200200   17.3100  148.7700       9.0        38       936        94
VIS    2025250    200200   17.3100  148.6800      10.0        18       992        90
VIS    2025250    200200   17.3100  148.6400       8.9        22       975        97
VIS    2025250    200200   17.3100  148.6200       9.0        24       968        97
VIS    2025250    200200   17.3100  148.5800      10.0        20       949        97
VIS    2025250    200200   17.3200  148.5800       9.8        20       953        99
VIS    2025250    200200   17.3000  148.5300       9.5        20       953        99
VIS    2025250    200200   17.3000  148.5300       9.5        19       969        99
VIS    2025250    200200   17.3000  148.1700      10.4        11       982        99
VIS    2025250    200200   17.3000  148.1500      10.3        10       953        99
VIS    2025250    200200   17.3100  148.1400      10.3         9       931        98
VIS    2025250    200200   17.3100  148.1000      10.0        13       914        99
VIS    2025250    200200   17.3100  148.0700      10.2        15       910        99
VIS    2025250    200200   17.3000  148.0600      10.3        14       914        99
VIS    2025250    200200   17.2900  148.0400      10.2        12       922        99
VIS    2025250    200200   17.3000  148.0000      10.4        10       918        98
VIS    2025250    200200   17.3100  148.0000      10.5        10       918        97
VIS    2025250    200200   17.3100  147.9700      10.4        11       918        96
VIS    2025250    200200   17.3000  147.9300      10.4        11       911        98
VIS    2025250    200200   17.3100  147.9100      10.4         9       910        97
VIS    2025250    200200   17.2900  147.9000      11.0         8       913        98
VIS    2025250    200200   17.2900  147.8500      10.5         6       920        97
VIS    2025250    200200   17.3000  147.8300      10.8         8       905        97
VIS    2025250    200200   17.3100  147.8100      10.7         6       878        94
VIS    2025250    200200   17.2900  147.7900       9.7         4       866        93
VIS    2025250    200200   17.3100  147.6800       9.0         9       805        90
VIS    2025250    200200   17.3000  147.6800       9.1        10       796        90
VIS    2025250    200200   17.3000  147.6500       9.9         9       849        97
VIS    2025250    200200   17.3000  147.6100      10.2        14       849        95
VIS    2025250    200200   17.2900  147.5900       9.9        17       829        96
VIS    2025250    200200   17.2900  147.5700       9.8        19       829        97
VIS    2025250    200200   17.3000  150.3600       8.3        24       990        95
VIS    2025250    200200   17.2800  148.8200       9.1        14       950        98
VIS    2025250    200200   17.2800  148.8100       9.2        15       938        99
VIS    2025250    200200   17.2900  148.7700       9.0        29       932        98
VIS    2025250    200200   17.2800  148.7500       8.9        31       943        96
VIS    2025250    200200   17.2800  148.7400       8.9        32       964        94
VIS    2025250    200200   17.2900  148.7200       8.9        35       978        92
VIS    2025250    200200   17.2800  148.6600       8.2        30       980        92
VIS    2025250    200200   17.2800  148.6000       8.3        27       953        90
VIS    2025250    200200   17.2800  148.5800       8.9        25       945        90
VIS    2025250    200200   17.2900  148.5600       9.7        19       941        96
VIS    2025250    200200   17.2700  148.5300       9.6        18       963        99
VIS    2025250    200200   17.2900  148.5200       9.2        19       969        98
VIS    2025250    200200   17.2900  148.1800      10.2        11       982        99
VIS    2025250    200200   17.2900  148.1500      10.3        10       953        99
VIS    2025250    200200   17.2800  148.1300      10.0        10       937        98
VIS    2025250    200200   17.2700  148.1200      10.1        10       937        98
VIS    2025250    200200   17.2800  148.0800      10.3        13       920        99
VIS    2025250    200200   17.2700  148.0600      10.0        13       927        98
VIS    2025250    200200   17.2800  148.0400      10.2        13       925        99
VIS    2025250    200200   17.2700  148.0200      10.0        12       937        98
VIS    2025250    200200   17.2800  147.9800       9.9         8       921        93
VIS    2025250    200200   17.2900  147.9600       9.9        10       915        94
VIS    2025250    200200   17.2800  147.9500       9.9        10       914        95
VIS    2025250    200200   17.2800  147.9200      10.7        10       913        98
VIS    2025250    200200   17.2700  147.9000      11.1        10       913        99
VIS    2025250    200200   17.2700  147.8700      10.8        11       934        99
VIS    2025250    200200   17.2900  147.8300      10.7         6       905        96
VIS    2025250    200200   17.2900  147.8300      10.7         6       905        96
VIS    2025250    200200   17.2900  147.8000      10.3         4       878        94
VIS    2025250    200200   17.2900  147.7200       9.0         8       788        90
VIS    2025250    200200   17.2800  147.7000       8.6         9       789        90
VIS    2025250    200200   17.2700  147.6300      10.9         8       835        91
VIS    2025250    200200   17.2700  147.6000      10.4        16       843        96
VIS    2025250    200200   17.2800  147.5700       9.8        19       795        93
VIS    2025250    200200   17.2600  147.5500      10.4        12       822        94
VIS    2025250    200200   17.2700  150.3700       8.8        28       990        92
VIS    2025250    200200   17.2700  150.3500       8.9        27       990        90
VIS    2025250    200200   17.2700  148.8100       9.1        10       950        98
VIS    2025250    200200   17.2700  148.8100       9.1        11       950        99
VIS    2025250    200200   17.2500  148.7800       9.6        18       933        98
VIS    2025250    200200   17.2600  148.7400       9.1        28       964        95
VIS    2025250    200200   17.2600  148.7200       8.8        33       968        91
VIS    2025250    200200   17.2700  148.7100       8.7        38       970        91
VIS    2025250    200200   17.2500  148.6800       9.0        27       970        96
VIS    2025250    200200   17.2600  148.6600       8.5        29       986        93
VIS    2025250    200200   17.2700  148.5600       9.4        20       939        94
VIS    2025250    200200   17.2600  148.1400       9.5         8       980        97
VIS    2025250    200200   17.2600  148.1300       9.8         8       953        97
VIS    2025250    200200   17.2700  148.1100      10.4        11       937        97
VIS    2025250    200200   17.2700  148.0700      10.1        14       935        98
VIS    2025250    200200   17.2700  148.0600      10.0        14       935        98
VIS    2025250    200200   17.2600  148.0200      10.0        12       942        98
VIS    2025250    200200   17.2600  148.0100      10.0        11       942        98
VIS    2025250    200200   17.2400  147.9700      10.7         6       917        98
VIS    2025250    200200   17.2600  147.9500      10.6         9       915        98
VIS    2025250    200200   17.2600  147.9300      10.8        10       911        98
VIS    2025250    200200   17.2500  147.9000      10.7         9       911        98
VIS    2025250    200200   17.2500  147.8900      10.5         8       907        99
VIS    2025250    200200   17.2600  147.8700      10.8         9       934        99
VIS    2025250    200200   17.2600  147.8300      11.4         2       893        93
VIS    2025250    200200   17.2600  147.8000      11.5         2       864        91
VIS    2025250    200200   17.2600  147.7800      10.9         1       849        90
VIS    2025250    200200   17.2400  147.6900       8.7         4       791        92
VIS    2025250    200200   17.2600  147.6100      10.5        17       835        95
VIS    2025250    200200   17.2600  147.6000      10.2        17       835        97
VIS    2025250    200200   17.2600  147.5500      10.7        11       829        94
VIS    2025250    200200   17.2500  147.5400      10.0         8       829        94
VIS    2025250    200200   17.2500  147.5000       5.7         7       765        90
VIS    2025250    200200   17.2500  150.6100       8.4        26       996        95
VIS    2025250    200200   17.2600  150.4000       8.3        25       994        95
VIS    2025250    200200   17.2400  148.7300       8.9        25       968        93
VIS    2025250    200200   17.2400  148.7200       8.7        26       968        92
VIS    2025250    200200   17.2300  148.6800       9.5        23       946        97
VIS    2025250    200200   17.2300  148.6700       9.3        26       949        96
VIS    2025250    200200   17.2300  148.6400       8.4        35       949        92
VIS    2025250    200200   17.2400  148.5700       9.0        22       956        92
VIS    2025250    200200   17.2400  148.1300       9.4         6       983        93
VIS    2025250    200200   17.2400  148.1100      10.4         7       980        92
VIS    2025250    200200   17.2200  148.0800      11.1        12       962        96
VIS    2025250    200200   17.2400  148.0000      10.2        10       944        96
VIS    2025250    200200   17.2400  147.9900      10.6         7       944        97
VIS    2025250    200200   17.2300  147.9700      11.0         3       917        98
VIS    2025250    200200   17.2300  147.9300      10.8         7       912        99
VIS    2025250    200200   17.2300  147.9000      10.4         7       904        99
VIS    2025250    200200   17.2400  147.8800      10.4         6       905        98
VIS    2025250    200200   17.2300  147.8500      10.6         3       907        97
VIS    2025250    200200   17.2400  147.8400      10.9         1       907        97
VIS    2025250    200200   17.2200  147.8000       9.8       358       852        92
VIS    2025250    200200   17.2200  147.8000       9.8       359       850        92
VIS    2025250    200200   17.2200  147.6800       9.6         3       800        91
VIS    2025250    200200   17.2400  147.5800      10.9        12       835        95
VIS    2025250    200200   17.2300  147.5400      10.6         7       888        99
VIS    2025250    200200   17.2200  147.5100      10.1         4       873        99
VIS    2025250    200200   17.2200  147.4900       9.6         5       854        99
VIS    2025250    200200   17.2200  148.7100       8.8        24       968        90
VIS    2025250    200200   17.2200  148.6900       9.4        22       946        97
VIS    2025250    200200   17.2000  148.6700       9.7        22       949        94
VIS    2025250    200200   17.2100  148.6600       9.0        33       946        93
VIS    2025250    200200   17.2000  148.6100       9.1        32       941        94
VIS    2025250    200200   17.2200  148.6000       9.1        30       960        92
VIS    2025250    200200   17.2000  148.1200      10.6         5       995        97
VIS    2025250    200200   17.2200  148.0800      11.1        11       962        97
VIS    2025250    200200   17.2200  148.0500      10.2        20       961        93
VIS    2025250    200200   17.2100  148.0500      10.1        20       959        93
VIS    2025250    200200   17.2200  148.0100      10.2        14       976        92
VIS    2025250    200200   17.2100  147.9800      10.6         1       961        96
VIS    2025250    200200   17.2100  147.9700      10.4       359       952        97
VIS    2025250    200200   17.2000  147.9500      10.0       359       941        97
VIS    2025250    200200   17.2100  147.9100      10.2         6       910        98
VIS    2025250    200200   17.2100  147.9000      10.2         6       909        97
VIS    2025250    200200   17.2100  147.8700      10.5         4       904        96
VIS    2025250    200200   17.2100  147.8500      10.6         3       906        97
VIS    2025250    200200   17.2100  147.8100       9.5       357       880        94
VIS    2025250    200200   17.2100  147.7900       9.5       359       847        92
VIS    2025250    200200   17.2000  147.7700       9.4         2       845        92
VIS    2025250    200200   17.2100  147.7500       9.9         5       835        90
VIS    2025250    200200   17.2000  147.7100       9.3         6       800        91
VIS    2025250    200200   17.2000  147.6800       9.9         4       817        92
VIS    2025250    200200   17.2000  147.6600      10.7         4       817        91
VIS    2025250    200200   17.2000  147.6600      10.7         5       817        92
VIS    2025250    200200   17.2000  147.6300       9.7         9       801        90
VIS    2025250    200200   17.2000  147.5700      10.9        11       838        94
VIS    2025250    200200   17.1900  147.5500      10.9         9       838        93
VIS    2025250    200200   17.2100  147.5200      10.7         6       856        97
VIS    2025250    200200   17.2100  147.5000      10.1         6       820        94
VIS    2025250    200200   17.2000  147.4700       9.6         7       806        93
VIS    2025250    200200   17.2200  150.6100       8.9        29       996        92
VIS    2025250    200200   17.2000  148.6600       9.6        24       949        94
VIS    2025250    200200   17.1800  148.0800      10.2         7       981        95
VIS    2025250    200200   17.1700  148.0400      10.4        10       947        99
VIS    2025250    200200   17.1900  147.9700      10.1         0       982        97
VIS    2025250    200200   17.1900  147.9400       9.7       359       941        96
VIS    2025250    200200   17.1900  147.9300       9.6       358       920        95
VIS    2025250    200200   17.1900  147.8900      10.1         2       910        95
VIS    2025250    200200   17.1700  147.8900      10.0         4       926        97
VIS    2025250    200200   17.1800  147.8500      11.1         3       909        96
VIS    2025250    200200   17.1800  147.8400      10.9         2       904        97
VIS    2025250    200200   17.1800  147.8000       8.9       353       880        93
VIS    2025250    200200   17.1700  147.7900       9.2       353       880        93
VIS    2025250    200200   17.1700  147.7300       9.7         3       812        92
VIS    2025250    200200   17.1700  147.7100       9.4         6       791        92
VIS    2025250    200200   17.1900  147.6700      10.2         5       817        93
VIS    2025250    200200   17.1700  147.6500      10.2         9       817        93
VIS    2025250    200200   17.1800  147.6200       9.8         5       814        93
VIS    2025250    200200   17.1700  147.6100       9.4         4       813        93
VIS    2025250    200200   17.1800  147.5800       9.3         5       796        92
VIS    2025250    200200   17.1900  147.5500      10.9         8       824        92
VIS    2025250    200200   17.1900  147.5500      10.9         9       824        92
VIS    2025250    200200   17.1800  147.5000      10.4         7       810        92
VIS    2025250    200200   17.1700  147.4800      10.3         3       805        90
VIS    2025250    200200   17.1900  147.4500       9.0         3       792        91
VIS    2025250    200200   17.1900  147.4400       8.2       359       783        90
VIS    2025250    200200   17.1500  148.5200       9.8         9       990        97
VIS    2025250    200200   17.1500  148.5100      10.5        10       990        92
VIS    2025250    200200   17.1700  148.0700      10.3         7       970        99
VIS    2025250    200200   17.1600  148.0500      10.3         7       947       100
VIS    2025250    200200   17.1600  148.0200      10.2         8       946        99
VIS    2025250    200200   17.1600  147.9500       9.0       358       972        95
VIS    2025250    200200   17.1700  147.9300       8.6       353       952        90
VIS    2025250    200200   17.1500  147.9000       9.5         3       953        99
VIS    2025250    200200   17.1700  147.8800      10.4         5       926        96
VIS    2025250    200200   17.1600  147.8700      11.2         5       926        97
VIS    2025250    200200   17.1600  147.8300      11.0         3       923        98
VIS    2025250    200200   17.1600  147.8000      10.1       357       901        96
VIS    2025250    200200   17.1600  147.7800       9.6       353       880        93
VIS    2025250    200200   17.1600  147.7400       9.7       359       818        92
VIS    2025250    200200   17.1600  147.7100       9.5         6       800        92
VIS    2025250    200200   17.1400  147.7000       9.7         7       831        97
VIS    2025250    200200   17.1500  147.6700       9.3        11       814        97
VIS    2025250    200200   17.1600  147.6300       9.9         8       844        97
VIS    2025250    200200   17.1500  147.6200       9.9         8       844        97
VIS    2025250    200200   17.1500  147.5900       8.9         2       814        94
VIS    2025250    200200   17.1400  147.5700       9.0       359       814        93
VIS    2025250    200200   17.1600  147.5300      10.3        12       799        93
VIS    2025250    200200   17.1400  147.5200       9.8         9       794        92
VIS    2025250    200200   17.1600  147.4800      10.2         4       805        91
VIS    2025250    200200   17.1600  147.4600       9.7         1       805        90
VIS    2025250    200200   17.1600  147.4400       9.0       359       805        91
VIS    2025250    200200   17.1400  148.0600      10.5        10       985        97
VIS    2025250    200200   17.1400  148.0300      10.4         8       947        99
VIS    2025250    200200   17.1400  148.0100      10.3         7       961        96
VIS    2025250    200200   17.1400  148.0000      10.1         7       961        94
VIS    2025250    200200   17.1200  147.9800      11.3         7       966        95
VIS    2025250    200200   17.1200  147.9300      10.7       355       963        99
VIS    2025250    200200   17.1200  147.9200      10.5       354       963        99
VIS    2025250    200200   17.1200  147.8800      10.4         3       953       100
VIS    2025250    200200   17.1200  147.8600      11.0         5       947        99
VIS    2025250    200200   17.1200  147.8600      11.0         5       947        99
VIS    2025250    200200   17.1200  147.8200      10.7         2       929        98
VIS    2025250    200200   17.1200  147.7900      10.6         0       903        96
VIS    2025250    200200   17.1400  147.7700       9.8       355       887        94
VIS    2025250    200200   17.1400  147.7600       9.5       355       859        92
VIS    2025250    200200   17.1300  147.7200       9.6         3       828        95
VIS    2025250    200200   17.1400  147.6900       9.7         7       831        97
VIS    2025250    200200   17.1200  147.6700      10.0         8       836        97
VIS    2025250    200200   17.1200  147.6600      10.1         7       836        97
VIS    2025250    200200   17.1200  147.6400       9.8         5       835        97
VIS    2025250    200200   17.1200  147.5900      10.1         8       860        99
VIS    2025250    200200   17.1400  147.5700       9.1       359       814        93
VIS    2025250    200200   17.1300  147.5600       9.2       360       825        94
VIS    2025250    200200   17.1400  147.5200       9.4         9       794        93
VIS    2025250    200200   17.1300  147.5100       9.4         8       799        93
VIS    2025250    200200   17.1200  147.4700       9.1         0       831        96
VIS    2025250    200200   17.1400  147.4600       9.4         0       831        95
VIS    2025250    200200   17.1400  147.4400       9.7       360       814        92
VIS    2025250    200200   17.1200  148.0400      10.7         8       977        98
VIS    2025250    200200   17.1000  147.9900      11.2         8       969        95
VIS    2025250    200200   17.1200  147.9500      11.4       356       963        98
VIS    2025250    200200   17.1000  147.9300      11.1       358       947        98
VIS    2025250    200200   17.1100  147.9000      10.8       360       953        99
VIS    2025250    200200   17.1200  147.8800      10.5         2       953       100
VIS    2025250    200200   17.1100  147.8700      10.5         2       932        99
VIS    2025250    200200   17.1100  147.8500      10.6         2       919        98
VIS    2025250    200200   17.1200  147.8100      10.5         0       916        97
VIS    2025250    200200   17.1200  147.8000      10.5         0       907        96
VIS    2025250    200200   17.1000  147.7600      10.2         3       895        97
VIS    2025250    200200   17.1000  147.7400       9.8         2       876        99
VIS    2025250    200200   17.1200  147.7300       9.3         2       820        94
VIS    2025250    200200   17.1100  147.6900       9.9         7       836        97
VIS    2025250    200200   17.1100  147.6600      10.2         6       839        97
VIS    2025250    200200   17.1100  147.6500      10.2         5       839        96
VIS    2025250    200200   17.1000  147.6200       9.9         3       835        95
VIS    2025250    200200   17.1000  147.6000      10.1         6       835        96
VIS    2025250    200200   17.1000  147.5700      10.1         4       860        99
VIS    2025250    200200   17.1000  147.5500       9.7       360       860        98
VIS    2025250    200200   17.1100  147.5100       9.1         2       802        92
VIS    2025250    200200   17.0900  147.4900       8.8       355       799        90
VIS    2025250    200200   17.1100  147.4600       8.9       359       821        94
VIS    2025250    200200   17.1000  147.4600       8.8       356       810        91
VIS    2025250    200200   17.1000  147.4000       7.9       357       780        90
VIS    2025250    200200   17.0900  148.0000      11.1         9       969        96
VIS    2025250    200200   17.0800  147.9700      10.7         7       964        94
VIS    2025250    200200   17.0800  147.9400      10.6         2       956        95
VIS    2025250    200200   17.0900  147.9100      10.8       359       933        98
VIS    2025250    200200   17.0700  147.8900       9.9         1       916        97
VIS    2025250    200200   17.0800  147.8700       9.8       360       916        96
VIS    2025250    200200   17.0700  147.8300      10.0         0       917        97
VIS    2025250    200200   17.0700  147.7900      10.7         6       907        98
VIS    2025250    200200   17.0700  147.7800      10.7         7       907        98
VIS    2025250    200200   17.0900  147.7400       9.8         1       863        98
VIS    2025250    200200   17.0900  147.7300       9.8         1       863        98
VIS    2025250    200200   17.0900  147.7000       9.4         3       835        96
VIS    2025250    200200   17.0700  147.6700       9.8         4       831        96
VIS    2025250    200200   17.0700  147.6500      10.3         4       832        94
VIS    2025250    200200   17.0800  147.6100      10.4         2       835        94
VIS    2025250    200200   17.0800  147.6000      10.2         1       835        95
VIS    2025250    200200   17.0800  147.5700      10.2         4       807        91
VIS    2025250    200200   17.0800  147.5500      10.1         3       797        90
VIS    2025250    200200   17.0800  147.5200       9.5         2       797        90
VIS    2025250    200200   17.0800  147.5100       9.4         3       797        91
VIS    2025250    200200   17.0800  147.4700       8.7       355       799        90
VIS    2025250    200200   17.0700  147.4400       8.9       359       802        91
VIS    2025250    200200   17.0700  147.4000       7.0       359       774        91
VIS    2025250    200200   17.0700  148.6700       9.3        26       995        90
VIS    2025250    200200   17.0800  148.6500       9.4        25       991        92
VIS    2025250    200200   17.0600  148.6100      10.1        28       985        91
VIS    2025250    200200   17.0600  148.5900       9.9        28       969        93
VIS    2025250    200200   17.0600  148.5700       9.6        30       964        93
VIS    2025250    200200   17.0700  147.9600      10.2         5       969        90
VIS    2025250    200200   17.0700  147.9400      10.3         4       959        94
VIS    2025250    200200   17.0700  147.9200      10.4         3       947        96
VIS    2025250    200200   17.0700  147.8900       9.8         1       916        97
VIS    2025250    200200   17.0600  147.8900       9.4       360       910        95
VIS    2025250    200200   17.0700  147.8600       9.4       358       913        95
VIS    2025250    200200   17.0600  147.8300      10.0         0       917        96
VIS    2025250    200200   17.0600  147.8000      10.6         5       932        99
VIS    2025250    200200   17.0600  147.7700      10.8         8       907        98
VIS    2025250    200200   17.0600  147.7600      10.7         7       902        97
VIS    2025250    200200   17.0500  147.7300      10.3         1       885        98
VIS    2025250    200200   17.0500  147.6900       9.7       356       835        93
VIS    2025250    200200   17.0500  147.6900       9.8       355       835        93
VIS    2025250    200200   17.0600  147.6600      10.4         3       810        90
VIS    2025250    200200   17.0500  147.6200      11.0       360       832        91
VIS    2025250    200200   17.0500  147.6100      10.8       358       832        92
VIS    2025250    200200   17.0500  147.5800      10.3         0       812        90
VIS    2025250    200200   17.0600  147.4800       9.1         2       797        90
VIS    2025250    200200   17.0500  147.4500       8.7         1       809        92
VIS    2025250    200200   17.0500  147.4300       8.5         1       809        91
VIS    2025250    200200   17.0600  147.4100       8.1       359       783        90
VIS    2025250    200200   17.0600  147.4000       6.9         0       753        92
VIS    2025250    200200   17.0500  148.6500       9.8        29       991        91
VIS    2025250    200200   17.0500  148.6000       9.9        28       969        92
VIS    2025250    200200   17.0500  148.5800       9.7        29       953        94
VIS    2025250    200200   17.0300  148.5700       9.8        25       953        94
VIS    2025250    200200   17.0300  147.9800      11.4        11       995        95
VIS    2025250    200200   17.0400  147.9400      10.0         3       982        97
VIS    2025250    200200   17.0300  147.9100       9.4         1       963        99
VIS    2025250    200200   17.0400  147.8900       9.1         1       910        97
VIS    2025250    200200   17.0400  147.8200      10.1         1       917        96
VIS    2025250    200200   17.0400  147.8000      10.5         5       941        98
VIS    2025250    200200   17.0300  147.7900      10.6         5       932        99
VIS    2025250    200200   17.0200  147.7500      10.6         1       912        99
VIS    2025250    200200   17.0400  147.7400      10.6         2       902        99
VIS    2025250    200200   17.0300  147.7100      10.2       356       873        96
VIS    2025250    200200   17.0400  147.6900       9.9       354       835        92
VIS    2025250    200200   17.0200  147.6600      10.1       355       824        90
VIS    2025250    200200   17.0400  147.5800      10.5         1       812        90
VIS    2025250    200200   17.0300  147.4500       8.9         3       782        90
VIS    2025250    200200   17.0400  147.4400       8.9         3       820        95
VIS    2025250    200200   17.0300  147.4000       8.6       358       829        94
VIS    2025250    200200   17.0200  147.3900       8.6       356       835        95
VIS    2025250    200200   17.0300  148.6000       9.9        31       965        90
VIS    2025250    200200   17.0200  148.5500       9.7        25       964        92
VIS    2025250    200200   17.0100  148.5300       9.8        22       964        96
VIS    2025250    200200   17.0100  148.5200       9.6        23       965        95
VIS    2025250    200200   17.0000  147.9900      10.4         9       995        97
VIS    2025250    200200   17.0200  147.9800      11.5        11       995        95
VIS    2025250    200200   17.0000  147.9600      10.9         9       990        97
VIS    2025250    200200   17.0000  147.9400      10.5        11       990        97
VIS    2025250    200200   17.0200  147.9000       8.7       359       943        98
VIS    2025250    200200   17.0200  147.8800       7.4       357       883        91
VIS    2025250    200200   17.0000  147.8000      10.2         0       917        98
VIS    2025250    200200   17.0000  147.7800      10.4       358       919        98
VIS    2025250    200200   17.0000  147.7600      10.3       358       922        97
VIS    2025250    200200   17.0200  147.7500      10.5         0       912        99
VIS    2025250    200200   17.0000  147.7100      10.2       358       880        98
VIS    2025250    200200   17.0000  147.6800      10.0       355       880        97
VIS    2025250    200200   17.0100  147.6600       9.9       354       863        96
VIS    2025250    200200   17.0100  147.6500      10.4       356       824        91
VIS    2025250    200200   17.0200  147.5900      10.3       357       828        91
VIS    2025250    200200   17.0000  147.5500      11.6         1       835        92
VIS    2025250    200200   17.0000  147.5400      11.7         1       867        95
VIS    2025250    200200   17.0000  147.5200      10.8         2       867        98
VIS    2025250    200200   17.0100  147.4300       9.4         2       829        96
VIS    2025250    200200   17.0000  147.4200       9.6         1       829        95
VIS    2025250    200200   17.0000  147.3800       8.9       358       792        90
VIS    2025250    200200   16.9800  148.5500       9.7        23       940        94
VIS    2025250    200200   16.9800  148.5500       9.8        22       928        97
VIS    2025250    200200   16.9800  148.5100       9.6        23       930        98
VIS    2025250    200200   17.0000  147.9900      10.1         8       995        98
VIS    2025250    200200   16.9800  147.9700      10.3         4       987        99
VIS    2025250    200200   16.9900  147.9400      10.5        13       990        95
VIS    2025250    200200   16.9900  147.9300      10.4        15       987        95
VIS    2025250    200200   16.9800  147.9000       9.6        14       980        96
VIS    2025250    200200   16.9800  147.8700       4.9        11       768        94
VIS    2025250    200200   16.9900  147.8000      10.3       357       890        94
VIS    2025250    200200   16.9900  147.7800      10.3       358       919        97
VIS    2025250    200200   16.9900  147.7600      10.2       358       919        96
VIS    2025250    200200   16.9900  147.7400      10.0       357       910        97
VIS    2025250    200200   16.9800  147.7000      10.3       358       885        99
VIS    2025250    200200   16.9700  147.6700       9.9       358       885        98
VIS    2025250    200200   16.9700  147.6600       9.9       358       885        98
VIS    2025250    200200   16.9700  147.6200      10.1       357       838        94
VIS    2025250    200200   16.9700  147.6000      10.2       357       834        92
VIS    2025250    200200   16.9700  147.5700      10.7         1       858        95
VIS    2025250    200200   16.9900  147.5400      11.7         1       867        95
VIS    2025250    200200   16.9700  147.5200      10.2       358       885        98
VIS    2025250    200200   16.9700  147.4900       8.9       357       870        96
VIS    2025250    200200   16.9700  147.4000       8.9         4       782        90
VIS    2025250    200200   16.9900  147.3900       9.3         0       792        90
VIS    2025250    200200   16.9900  147.3700       9.0       358       788        90
VIS    2025250    200200   16.9800  148.6200      10.5        21       977        93
VIS    2025250    200200   16.9700  148.5500       9.8        22       943        97
VIS    2025250    200200   16.9800  148.5400      10.0        20       928        98
VIS    2025250    200200   16.9800  148.5100       9.9        22       930        98
VIS    2025250    200200   16.9700  148.4800       9.5        24       948        96
VIS    2025250    200200   16.9700  147.9500      10.2         8       985        98
VIS    2025250    200200   16.9500  147.9100       9.9        11       979        98
VIS    2025250    200200   16.9500  147.8900      10.0         8       989        97
VIS    2025250    200200   16.9600  147.8500       5.7         2       761        90
VIS    2025250    200200   16.9600  147.7600       9.9       357       910        97
VIS    2025250    200200   16.9700  147.7500       9.9       356       910        94
VIS    2025250    200200   16.9600  147.7100      10.4       359       885        98
VIS    2025250    200200   16.9700  147.6800      10.1       359       885        98
VIS    2025250    200200   16.9600  147.6700      10.1       357       885        98
VIS    2025250    200200   16.9500  147.6400       9.9       355       880        96
VIS    2025250    200200   16.9700  147.6200      10.1       356       838        94
VIS    2025250    200200   16.9700  147.6000      10.1       357       834        93
VIS    2025250    200200   16.9700  147.5800      10.3       359       834        90
VIS    2025250    200200   16.9600  147.5400      10.6         2       876        97
VIS    2025250    200200   16.9500  147.5300       9.8       358       885        98
VIS    2025250    200200   16.9700  147.4900       8.9       359       870        97
VIS    2025250    200200   16.9600  147.4800       8.8         2       798        91
VIS    2025250    200200   16.9500  147.4400       8.6         1       779        91
VIS    2025250    200200   16.9500  147.4100       8.4         3       783        92
VIS    2025250    200200   16.9500  147.4000       8.3         3       788        92
VIS    2025250    200200   16.9500  147.8800       9.8         6       989        97
VIS    2025250    200200   16.9300  147.8400       9.9       359       967       100
VIS    2025250    200200   16.9400  147.7500       9.7         1       883        95
VIS    2025250    200200   16.9300  147.7200       9.7         3       883        99
VIS    2025250    200200   16.9300  147.7000      10.0         3       894        99
VIS    2025250    200200   16.9400  147.6700      10.1       356       885        97
VIS    2025250    200200   16.9400  147.6500       9.8       354       885        96
VIS    2025250    200200   16.9400  147.6200       9.9       352       841        92
VIS    2025250    200200   16.9300  147.6100       9.8       349       841        90
VIS    2025250    200200   16.9200  147.5900       9.1       350       836        92
VIS    2025250    200200   16.9300  147.5400       9.5       360       869        98
VIS    2025250    200200   16.9300  147.5300       9.4       357       870        95
VIS    2025250    200200   16.9200  147.5000       7.6       357       870        90
VIS    2025250    200200   16.9200  147.4900       7.7       358       870        94
VIS    2025250    200200   16.9300  147.4700       8.4         1       797        91
VIS    2025250    200200   16.9000  147.9900      10.9         6       994        97
VIS    2025250    200200   16.9000  147.9800      11.0         6       994        97
VIS    2025250    200200   16.9100  147.8600      10.8         5       980        98
VIS    2025250    200200   16.9100  147.8400      10.7         3       972        99
VIS    2025250    200200   16.9000  147.8400      10.7         3       968        99
VIS    2025250    200200   16.9100  147.7900      10.0       352       920        96
VIS    2025250    200200   16.9100  147.7900       9.9       351       920        95
VIS    2025250    200200   16.9000  147.7500       9.1       356       870        92
VIS    2025250    200200   16.9100  147.7200       9.6         3       885        98
VIS    2025250    200200   16.9100  147.7000       9.9         5       905        99
VIS    2025250    200200   16.9200  147.6800      10.1         2       888        99
VIS    2025250    200200   16.9100  147.6500       9.0       355       835        93
VIS    2025250    200200   16.9200  147.5900       9.1       351       834        92
VIS    2025250    200200   16.9000  147.3600       8.9       352       816        90
VIS    2025250    200200   16.9000  147.3400       8.5       352       816        91
VIS    2025250    200200   16.8600  142.2100       5.2       158       814        92
VIS    2025250    200200   16.8800  147.9900      10.3         9       999        97
VIS    2025250    200200   16.8800  147.9700      10.7        11       994        96
VIS    2025250    200200   16.8800  147.8500      10.5         5       979        98
VIS    2025250    200200   16.9000  147.8300      10.7         3       968        99
VIS    2025250    200200   16.9000  147.7900      10.0       351       962        97
VIS    2025250    200200   16.8900  147.7600       9.1       353       874        91
VIS    2025250    200200   16.9000  147.7000       9.7         4       910        96
VIS    2025250    200200   16.8900  147.6800       9.6         1       918        97
VIS    2025250    200200   16.8900  147.6700       9.5         0       893        97
VIS    2025250    200200   16.8800  147.6400       8.7       356       864        96
VIS    2025250    200200   16.8800  147.4200       9.2       349       844        91
VIS    2025250    200200   16.8800  147.3800       9.5       348       838        91
VIS    2025250    200200   16.8700  147.3400       9.6       350       848        92
VIS    2025250    200200   16.8900  147.3300       9.0       352       835        93
VIS    2025250    200200   16.8800  147.3000      10.1       350       865        93
VIS    2025250    200200   16.8800  147.2800       9.8       352       829        90
VIS    2025250    200200   16.8700  147.2400       7.6       357       718        90
VIS    2025250    200200   16.8600  142.2100       4.9       158       816        92
VIS    2025250    200200   16.8500  142.2000       4.7       161       830        90
VIS    2025250    200200   16.8600  148.0100       9.9         9       999        98
VIS    2025250    200200   16.8700  148.0000      10.3         9       994        98
VIS    2025250    200200   16.8600  147.9600      10.4        13       972        97
VIS    2025250    200200   16.8500  147.9500      10.2        14       972        96
VIS    2025250    200200   16.8600  147.9100      10.5        14       985        91
VIS    2025250    200200   16.8600  147.8400       9.4       356       976       100
VIS    2025250    200200   16.8600  147.8300       9.3       355       976        99
VIS    2025250    200200   16.8600  147.8000       8.9       351       968        98
VIS    2025250    200200   16.8700  147.7500       9.4       353       900        94
VIS    2025250    200200   16.8700  147.7400       9.3       355       890        92
VIS    2025250    200200   16.8600  147.7100       9.2       355       918        93
VIS    2025250    200200   16.8600  147.6500       8.6       355       888        90
VIS    2025250    200200   16.8600  147.6200       8.1       350       836        93
VIS    2025250    200200   16.8700  147.3400       9.7       349       865        93
VIS    2025250    200200   16.8600  147.3000      10.3       349       881        90
VIS    2025250    200200   16.8600  147.2900      10.1       350       881        91
VIS    2025250    200200   16.8600  147.2300       7.3       355       718        91
VIS    2025250    200200   16.8200  142.2700      11.3       153       823        92
VIS    2025250    200200   16.8300  142.2600      10.1       153       835        95
VIS    2025250    200200   16.8300  142.2400       7.6       156       835        97
VIS    2025250    200200   16.8200  142.2000       4.6       157       830        92
VIS    2025250    200200   16.8400  148.0100      10.0        10       970        98
VIS    2025250    200200   16.8300  147.9600       9.7         7       980        99
VIS    2025250    200200   16.8300  147.9400       9.8         7       980        99
VIS    2025250    200200   16.8300  147.9100      10.1        10       982        98
VIS    2025250    200200   16.8300  147.9000      10.1         8       975        99
VIS    2025250    200200   16.8300  147.8700       9.9         4       992        99
VIS    2025250    200200   16.8300  147.8500      10.0         4       991        99
VIS    2025250    200200   16.8500  147.7400       9.9       352       964        97
VIS    2025250    200200   16.8300  147.7200       9.7       353       964        98
VIS    2025250    200200   16.8300  147.6800       8.8       353       962        92
VIS    2025250    200200   16.8200  147.2500       9.6       345       836        90
VIS    2025250    200200   16.8400  147.2400       8.6       351       772        95
VIS    2025250    200200   16.8100  142.2600       9.9       151       812        99
VIS    2025250    200200   16.7900  142.2300       8.7       156       812        92
VIS    2025250    200200   16.8300  147.9400       9.9         4       980        99
VIS    2025250    200200   16.8300  147.9200      10.0         5       975        99
VIS    2025250    200200   16.8200  147.9100      10.1         6       975        99
VIS    2025250    200200   16.8200  147.8900      10.0         6       969        99
VIS    2025250    200200   16.8200  147.7000       9.6       355       963        97
VIS    2025250    200200   16.8200  147.6900       9.3       355       963        97
VIS    2025250    200200   16.8000  147.6500       8.2       351       962        95
VIS    2025250    200200   16.8100  147.6300       8.0       350       906        93
VIS    2025250    200200   16.8100  147.2100       8.8       346       750        91
VIS    2025250    200200   16.8100  147.2000       8.8       347       747        91
VIS    2025250    200200   16.7700  142.2300       9.5       155       812        97
VIS    2025250    200200   16.7800  142.2200       9.1       156       812        97
VIS    2025250    200200   16.7800  147.9400       9.9       354       983        99
VIS    2025250    200200   16.7800  147.9000       9.3       357       950        99
VIS    2025250    200200   16.7800  147.7100      10.5       357       980        95
VIS    2025250    200200   16.8000  147.6900       9.6       358       963        96
VIS    2025250    200200   16.7900  147.6700       8.5       354       962        97
VIS    2025250    200200   16.7800  147.6400       7.8       348       902        93
VIS    2025250    200200   16.7800  147.6100       8.5       355       848        96
VIS    2025250    200200   16.7500  142.2600       9.5       151       829        98
VIS    2025250    200200   16.7500  142.2100       9.6       155       849        93
VIS    2025250    200200   16.7700  148.6500       8.8         7       994        99
VIS    2025250    200200   16.7700  148.6200       8.5         7       992        99
VIS    2025250    200200   16.7800  148.6100       8.5         7       994        97
VIS    2025250    200200   16.7600  147.9400       9.8       356       968        99
VIS    2025250    200200   16.7700  147.9200       9.6       356       959        99
VIS    2025250    200200   16.7600  147.9000       9.5       358       943        99
VIS    2025250    200200   16.7600  147.7900       7.8         1       959        96
VIS    2025250    200200   16.7600  147.7700       9.2         2       985       100
VIS    2025250    200200   16.7600  147.7400      10.5         0       980        98
VIS    2025250    200200   16.7500  147.7200      10.4       356       975        99
VIS    2025250    200200   16.7700  147.6600       8.2       354       963        97
VIS    2025250    200200   16.7500  147.6400       8.1       353       954        96
VIS    2025250    200200   16.7600  147.6000       8.4       360       872        97
VIS    2025250    200200   16.7500  148.6500       8.8         8       992        99
VIS    2025250    200200   16.7400  148.6200       8.8         9       980        97
VIS    2025250    200200   16.7400  148.6000       8.9         7       960        99
VIS    2025250    200200   16.7400  148.5900       8.9         6       960        99
VIS    2025250    200200   16.7400  148.5600       8.9         4       965        98
VIS    2025250    200200   16.7400  148.5300       8.8         3       968        99
VIS    2025250    200200   16.7400  148.5100       8.7         2       968        99
VIS    2025250    200200   16.7300  147.9500      10.4         0       968        97
VIS    2025250    200200   16.7500  147.9400      10.0       357       965        99
VIS    2025250    200200   16.7500  147.8900       9.8       357       943        98
VIS    2025250    200200   16.7400  147.7800       8.5       357       955        97
VIS    2025250    200200   16.7400  147.7300      10.5       358       975        96
VIS    2025250    200200   16.7400  147.7200      10.4       357       975        96
VIS    2025250    200200   16.7300  147.6300       8.9       355       954        99
VIS    2025250    200200   16.7300  147.6100       8.4       358       935        97
VIS    2025250    200200   16.7300  147.5900       8.0       359       884        99
VIS    2025250    200200   16.7300  147.5600       7.9       355       855       100
VIS    2025250    200200   16.7400  147.5500       8.6       356       806        92
VIS    2025250    200200   16.7400  147.4400       9.2       354       828        91
VIS    2025250    200200   16.7300  147.3900       7.8       342       816        92
VIS    2025250    200200   16.7300  147.3800       7.3       340       816        92
VIS    2025250    200200   16.7200  148.6700       8.9         7       977        97
VIS    2025250    200200   16.7200  148.6400       8.7        10       977        97
VIS    2025250    200200   16.7300  148.6200       8.9        10       960        98
VIS    2025250    200200   16.7200  148.6100       9.0        10       960        98
VIS    2025250    200200   16.7100  148.5700       9.2         7       959        97
VIS    2025250    200200   16.7100  148.5600       8.9         6       961        98
VIS    2025250    200200   16.7200  148.5300       8.7         4       962        99
VIS    2025250    200200   16.7200  148.4700       8.9         4       980        98
VIS    2025250    200200   16.7200  148.4700       9.0         4       980        98
VIS    2025250    200200   16.7100  147.9700      11.0         4       989        91
VIS    2025250    200200   16.7200  147.9500      10.6         2       963        95
VIS    2025250    200200   16.7200  147.9200      10.2       359       950        98
VIS    2025250    200200   16.7200  147.8600      10.2       357       971        95
VIS    2025250    200200   16.7300  147.7200      10.3       359       974        93
VIS    2025250    200200   16.7200  147.6600       9.8       356       977        94
VIS    2025250    200200   16.7100  147.6300      10.1       355       952        98
VIS    2025250    200200   16.7100  147.6300      10.1       356       952        98
VIS    2025250    200200   16.7200  147.6000       8.6       358       935        98
VIS    2025250    200200   16.7000  147.5700       8.0       353       863        99
VIS    2025250    200200   16.7100  147.5400       7.9       351       803        93
VIS    2025250    200200   16.7000  147.4200       8.6       352       828        95
VIS    2025250    200200   16.7200  147.4100       8.3       347       873        98
VIS    2025250    200200   16.7200  147.3700       6.7       340       816        93
VIS    2025250    200200   16.7000  147.3200       7.4       351       818        96
VIS    2025250    200200   16.7200  147.2700       7.8       349       803        92
VIS    2025250    200200   16.7000  147.2500       8.0       352       821        94
VIS    2025250    200200   16.7000  147.2400       8.2       353       828        95
VIS    2025250    200200   16.7100  148.7100       8.5         6       991        96
VIS    2025250    200200   16.7000  148.6800       9.1         7       991        95
VIS    2025250    200200   16.7100  148.6700       9.0         7       977        96
VIS    2025250    200200   16.7000  148.6300       9.2         8       960        97
VIS    2025250    200200   16.7000  148.6100       9.2         9       949        98
VIS    2025250    200200   16.7100  148.5900       9.5         9       950        98
VIS    2025250    200200   16.7000  148.5600       9.0         8       953        98
VIS    2025250    200200   16.7000  148.5300       8.6         7       958        98
VIS    2025250    200200   16.6900  148.5100       8.6         6       961        99
VIS    2025250    200200   16.7000  148.4900       8.7         5       972        98
VIS    2025250    200200   16.6900  148.4700       8.9         5       980        98
VIS    2025250    200200   16.6900  148.4500       9.0         5       971        98
VIS    2025250    200200   16.7000  148.4300       8.8         5       971        97
VIS    2025250    200200   16.7000  147.9300      10.3         2       968        92
VIS    2025250    200200   16.7000  147.8500      10.0       356       971        92
VIS    2025250    200200   16.6900  147.6800       9.8       359       986        94
VIS    2025250    200200   16.6800  147.6600       9.6       358       981        97
VIS    2025250    200200   16.7000  147.6300      10.3       355       952        98
VIS    2025250    200200   16.7000  147.6300      10.3       355       952        98
VIS    2025250    200200   16.6800  147.6000       9.5       357       952        97
VIS    2025250    200200   16.7000  147.5600       8.2       354       863        99
VIS    2025250    200200   16.7000  147.5500       8.5       355       855        99
VIS    2025250    200200   16.6800  147.4700       8.3       352       802        92
VIS    2025250    200200   16.6800  147.4400       8.0       352       830        97
VIS    2025250    200200   16.6900  147.4100       8.1       354       847        97
VIS    2025250    200200   16.6900  147.4100       8.1       355       847        96
VIS    2025250    200200   16.6800  147.3800       7.5       358       831        93
VIS    2025250    200200   16.7000  147.3400       6.8       352       824        98
VIS    2025250    200200   16.7000  147.3300       7.0       352       819        97
VIS    2025250    200200   16.6800  147.2900       9.4       342       862        94
VIS    2025250    200200   16.6900  147.2900       8.7       342       821        91
VIS    2025250    200200   16.7000  147.2400       8.2       353       847        96
VIS    2025250    200200   16.7000  147.2400       8.2       353       847        96
VIS    2025250    200200   16.6800  147.2100       8.7       350       851        96
VIS    2025250    200200   16.6700  148.6600       9.4         6       986        92
VIS    2025250    200200   16.6900  148.6400       9.2         7       976        94
VIS    2025250    200200   16.6900  148.6300       9.3         7       960        96
VIS    2025250    200200   16.6900  148.6000       9.3         9       946        98
VIS    2025250    200200   16.6900  148.5800       9.3         8       946        98
VIS    2025250    200200   16.6700  148.5400       8.6         9       946        98
VIS    2025250    200200   16.6800  148.5200       8.5         9       959        98
VIS    2025250    200200   16.6700  148.5100       8.5         9       961        98
VIS    2025250    200200   16.6700  148.4700       8.8         7       972        98
VIS    2025250    200200   16.6700  148.4500       8.8         7       966        98
VIS    2025250    200200   16.6700  148.4200       8.8         6       958        99
VIS    2025250    200200   16.6700  148.4100       8.7         6       957        99
VIS    2025250    200200   16.6600  148.3900       8.9         6       957        98
VIS    2025250    200200   16.6700  147.6800       9.4       358       986        97
VIS    2025250    200200   16.6700  147.6700       9.3       356       981        98
VIS    2025250    200200   16.6600  147.6400       9.9       353       966        98
VIS    2025250    200200   16.6800  147.6100      10.0       356       965        96
VIS    2025250    200200   16.6700  147.5900       9.1       357       961        97
VIS    2025250    200200   16.6700  147.5600       9.3       358       939        98
VIS    2025250    200200   16.6700  147.5400       9.3       358       933        99
VIS    2025250    200200   16.6600  147.5200       8.9       356       933        98
VIS    2025250    200200   16.6700  147.4600       7.6       349       802        92
VIS    2025250    200200   16.6600  147.4400       7.8       347       831        96
VIS    2025250    200200   16.6700  147.4300       7.9       350       830        97
VIS    2025250    200200   16.6500  147.3800       9.4       357       873        99
VIS    2025250    200200   16.6600  147.3600       9.1       351       875        99
VIS    2025250    200200   16.6600  147.3400       9.3       347       882        98
VIS    2025250    200200   16.6600  147.3300       9.4       346       882        97
VIS    2025250    200200   16.6700  147.2900       9.6       343       895        96
VIS    2025250    200200   16.6700  147.2800       9.5       345       872        96
VIS    2025250    200200   16.6600  147.2600       8.6       350       864        96
VIS    2025250    200200   16.6700  147.2300       8.5       350       864        98
VIS    2025250    200200   16.6500  147.1900       7.8       350       851        98
VIS    2025250    200200   16.6600  147.1900       7.5       351       847        97
VIS    2025250    200200   16.6500  148.7300       8.6         9       972        96
VIS    2025250    200200   16.6500  148.7100       8.8         8       977        96
VIS    2025250    200200   16.6500  148.6900       8.9         7       984        97
VIS    2025250    200200   16.6600  148.6600       9.4         5       986        95
VIS    2025250    200200   16.6600  148.6200       9.4         8       976        93
VIS    2025250    200200   16.6600  148.6200       9.4         9       976        94
VIS    2025250    200200   16.6500  148.5800       9.2        10       935        98
VIS    2025250    200200   16.6500  148.5700       9.0         9       935        98
VIS    2025250    200200   16.6600  148.5300       8.4        10       957        97
VIS    2025250    200200   16.6500  148.5200       8.5        10       967        97
VIS    2025250    200200   16.6400  148.4900       8.8         9       970        97
VIS    2025250    200200   16.6600  148.4500       8.9         7       965        98
VIS    2025250    200200   16.6600  148.4500       8.9         7       965        98
VIS    2025250    200200   16.6400  148.4100       9.2         7       954        98
VIS    2025250    200200   16.6500  147.6700       9.3       349       972        98
VIS    2025250    200200   16.6400  147.6300       9.3       352       966        99
VIS    2025250    200200   16.6400  147.6300       9.2       353       966        99
VIS    2025250    200200   16.6500  147.5900       8.8       357       967        98
VIS    2025250    200200   16.6300  147.5800       9.3       355       967        98
VIS    2025250    200200   16.6500  147.5500       9.8       357       961        97
VIS    2025250    200200   16.6500  147.5300       9.3       357       942        98
VIS    2025250    200200   16.6500  147.4900       7.6       353       816        95
VIS    2025250    200200   16.6500  147.4400       8.2       348       830        94
VIS    2025250    200200   16.6400  147.4200       8.8       349       835        95
VIS    2025250    200200   16.6400  147.3900       9.4       353       893       100
VIS    2025250    200200   16.6400  147.3600       9.5       352       893        99
VIS    2025250    200200   16.6500  147.3600       9.5       351       893        99
VIS    2025250    200200   16.6500  147.3200       9.8       346       905        98
VIS    2025250    200200   16.6300  147.3000       9.6       347       943        96
VIS    2025250    200200   16.6400  147.2900       9.5       349       905        97
VIS    2025250    200200   16.6300  147.2600       8.9       349       895        96
VIS    2025250    200200   16.6400  147.2300       8.3       345       853        97
VIS    2025250    200200   16.6400  147.2000       8.0       346       851        96
VIS    2025250    200200   16.6500  147.1900       7.8       350       851        97
VIS    2025250    200200   16.6400  147.1600       6.9       347       797        92
VIS    2025250    200200   16.6300  148.7400       8.5        10       970        94
VIS    2025250    200200   16.6400  148.7200       8.6         9       977        96
VIS    2025250    200200   16.6300  148.7100       8.7        10       977        96
VIS    2025250    200200   16.6300  148.6800       8.8         8       979        97
VIS    2025250    200200   16.6300  148.6500       8.7         7       984        97
VIS    2025250    200200   16.6200  148.6200       8.6         8       982        97
VIS    2025250    200200   16.6200  148.6100       8.7         8       974        97
VIS    2025250    200200   16.6200  148.5900       8.8         8       963        98
VIS    2025250    200200   16.6200  148.5500       8.7         8       944        99
VIS    2025250    200200   16.6300  148.5400       8.6         8       945        99
VIS    2025250    200200   16.6200  148.5000       8.8         7       966        98
VIS    2025250    200200   16.6200  148.4900       8.8         7       967        98
VIS    2025250    200200   16.6300  148.4600       9.1         7       966        97
VIS    2025250    200200   16.6400  148.4400       9.2         7       959        98
VIS    2025250    200200   16.6400  148.4100       9.3         7       954        97
VIS    2025250    200200   16.6300  148.4000       9.5         7       959        95
VIS    2025250    200200   16.6200  148.3700       9.1         6       963        96
VIS    2025250    200200   16.6200  148.3500       9.0         6       967        96
VIS    2025250    200200   16.6200  148.3200       8.3        13       971        96
VIS    2025250    200200   16.6300  147.5700       9.5       355       967        97
VIS    2025250    200200   16.6100  147.5300       9.5       352       967        99
VIS    2025250    200200   16.6100  147.5200       9.4       353       966        99
VIS    2025250    200200   16.6200  147.4800       8.1       351       878        98
VIS    2025250    200200   16.6200  147.4700       8.2       351       808        92
VIS    2025250    200200   16.6200  147.4300       8.6       350       838        96
VIS    2025250    200200   16.6200  147.4200       9.0       350       879        98
VIS    2025250    200200   16.6300  147.3900       9.4       350       893        99
VIS    2025250    200200   16.6200  147.3800       9.4       349       916        98
VIS    2025250    200200   16.6100  147.3400       9.2       344       917        97
VIS    2025250    200200   16.6200  147.3100       9.4       343       946        95
VIS    2025250    200200   16.6200  147.3000       9.4       344       949        95
VIS    2025250    200200   16.6200  147.2600       8.8       347       897        95
VIS    2025250    200200   16.6100  147.2500       8.4       346       897        97
VIS    2025250    200200   16.6100  147.2100       6.9       345       794        95
VIS    2025250    200200   16.6000  147.2000       6.5       346       788        96
VIS    2025250    200200   16.6000  147.1700       6.9       344       790        92
VIS    2025250    200200   16.5800  142.2600       6.8       166       807        92
VIS    2025250    200200   16.5800  142.2400       6.8       167       865        95
VIS    2025250    200200   16.5900  148.7000       8.6        11       981        94
VIS    2025250    200200   16.6000  148.7000       8.7        11       981        94
VIS    2025250    200200   16.6000  148.6500       8.7         8       980        96
VIS    2025250    200200   16.6100  148.6100       8.6         7       974        98
VIS    2025250    200200   16.6100  148.6000       8.7         7       974        98
VIS    2025250    200200   16.6100  148.5600       8.7        10       944        99
VIS    2025250    200200   16.6100  148.5300       8.5         8       940        99
VIS    2025250    200200   16.6100  148.5200       8.6         7       945        99
VIS    2025250    200200   16.6100  148.4900       8.9         7       966        98
VIS    2025250    200200   16.5900  148.4800       8.8         7       954        99
VIS    2025250    200200   16.6000  148.4400       9.2         7       962        98
VIS    2025250    200200   16.5900  148.4300       9.3         6       968        98
VIS    2025250    200200   16.6100  148.4000       9.7         6       960        95
VIS    2025250    200200   16.6100  148.3800       9.4         5       960        96
VIS    2025250    200200   16.6000  148.3500       8.6        10       971        97
VIS    2025250    200200   16.5900  148.3100       8.3         7       961        99
VIS    2025250    200200   16.5800  147.6300       9.0       356       997        97
VIS    2025250    200200   16.6000  147.5800       9.6       357       976        94
VIS    2025250    200200   16.5900  147.5400       9.0       351       983        99
VIS    2025250    200200   16.5900  147.5100       8.7       352       965        99
VIS    2025250    200200   16.5800  147.4800       8.5       352       902        98
VIS    2025250    200200   16.5900  147.4800       8.5       352       897        98
VIS    2025250    200200   16.5800  147.4300       8.6       349       879        99
VIS    2025250    200200   16.5800  147.4300       8.6       349       880        98
VIS    2025250    200200   16.6000  147.4000       8.9       349       895        98
VIS    2025250    200200   16.6000  147.3800       9.2       347       898        98
VIS    2025250    200200   16.5900  147.3500       9.1       344       886        95
VIS    2025250    200200   16.6000  147.3200       8.8       342       914        94
VIS    2025250    200200   16.5900  147.3100       8.3       340       914        93
VIS    2025250    200200   16.5800  147.2600       8.2       343       921        95
VIS    2025250    200200   16.5800  147.2600       8.2       344       921        95
VIS    2025250    200200   16.5900  147.2300       8.3       346       921        98
VIS    2025250    200200   16.5900  147.2100       6.8       344       804        95
VIS    2025250    200200   16.5900  147.1800       6.7       347       777        93
VIS    2025250    200200   16.5800  147.1600       7.6       350       777        91
VIS    2025250    200200   16.5900  147.1200       8.5       348       814        90
VIS    2025250    200200   16.5900  147.1000       6.7       343       793        92
VIS    2025250    200200   16.5700  142.2600       6.6       169       830        91
VIS    2025250    200200   16.5900  148.8100       8.6         5       967        98
VIS    2025250    200200   16.5800  148.7900       8.9         6       967        98
VIS    2025250    200200   16.5800  148.7200       8.4        11       983        95
VIS    2025250    200200   16.5800  148.6900       8.5        10       980        95
VIS    2025250    200200   16.5800  148.6800       8.5        11       979        96
VIS    2025250    200200   16.5900  148.6600       8.6         9       980        96
VIS    2025250    200200   16.5700  148.5600       8.8         8       968        96
VIS    2025250    200200   16.5800  148.5500       8.8         9       962        97
VIS    2025250    200200   16.5800  148.5200       8.7         6       940        99
VIS    2025250    200200   16.5800  148.5000       8.7         5       945        99
VIS    2025250    200200   16.5800  148.4800       8.7         7       949        99
VIS    2025250    200200   16.5700  148.4500       8.9         8       955        99
VIS    2025250    200200   16.5900  148.4200       9.3         5       968        98
VIS    2025250    200200   16.5700  148.4100       8.8         4       968        99
VIS    2025250    200200   16.5700  148.3900       8.7         6       971        98
VIS    2025250    200200   16.5700  148.3600       8.4        13       959        97
VIS    2025250    200200   16.5700  148.3300       8.3         8       959        99
VIS    2025250    200200   16.5800  148.3100       8.4         4       961        99
VIS    2025250    200200   16.5800  147.6400       9.1       356       997        98
VIS    2025250    200200   16.5700  147.6200       9.1       356       997        98
VIS    2025250    200200   16.5600  147.6100       9.0       355       994        98
VIS    2025250    200200   16.5700  147.5000       8.3       350       940        96
VIS    2025250    200200   16.5800  147.4900       8.4       351       940        98
VIS    2025250    200200   16.5700  147.4500       8.7       351       880        99
VIS    2025250    200200   16.5800  147.4200       8.7       350       895        99
VIS    2025250    200200   16.5700  147.4100       8.8       350       895        99
VIS    2025250    200200   16.5700  147.3800       8.9       347       883        97
VIS    2025250    200200   16.5700  147.3600       9.0       345       877        96
VIS    2025250    200200   16.5600  147.3300       8.7       342       873        96
VIS    2025250    200200   16.5600  147.3000       8.2       345       873        96
VIS    2025250    200200   16.5600  147.2900       8.0       344       873        96
VIS    2025250    200200   16.5800  147.2700       8.0       342       877        96
VIS    2025250    200200   16.5700  147.2300       8.3       347       865        99
VIS    2025250    200200   16.5600  147.2200       8.3       348       835        97
VIS    2025250    200200   16.5700  147.1900       7.1       351       798        97
VIS    2025250    200200   16.5700  147.1700       7.1       352       790        96
VIS    2025250    200200   16.5600  147.1400       8.0       347       798        92
VIS    2025250    200200   16.5600  147.1300       8.4       346       799        91
VIS    2025250    200200   16.5600  147.0900       7.2       344       785        92
VIS    2025250    200200   16.5600  146.6900       6.3       334       763        91
VIS    2025250    200200   16.5400  142.2000       6.6       165       958        95
VIS    2025250    200200   16.5500  148.7900       9.1         4       967        97
VIS    2025250    200200   16.5600  148.7600       8.9         6       967        98
VIS    2025250    200200   16.5600  148.7500       8.8         7       967        98
VIS    2025250    200200   16.5500  148.7200       8.2        11       979        95
VIS    2025250    200200   16.5600  148.6900       8.4        11       977        95
VIS    2025250    200200   16.5500  148.6600       8.2        13       962        95
VIS    2025250    200200   16.5600  148.6500       8.4        12       977        95
VIS    2025250    200200   16.5600  148.5700       8.9         7       973        96
VIS    2025250    200200   16.5600  148.5600       9.0         7       968        97
VIS    2025250    200200   16.5400  148.4900       9.0         6       962        98
VIS    2025250    200200   16.5400  148.4700       8.8         6       962        99
VIS    2025250    200200   16.5600  148.4500       8.8         8       955        98
VIS    2025250    200200   16.5400  148.4300       8.5         9       950        99
VIS    2025250    200200   16.5600  148.4100       8.4         6       957        99
VIS    2025250    200200   16.5600  148.3700       8.5        11       959        98
VIS    2025250    200200   16.5600  148.3600       8.6        12       959        97
VIS    2025250    200200   16.5600  148.3200       8.3         6       959        99
VIS    2025250    200200   16.5600  148.3100       8.3         4       959        99
VIS    2025250    200200   16.5400  148.1300       7.1       356      1000        94
VIS    2025250    200200   16.5600  147.6500       9.3       357       999        97
VIS    2025250    200200   16.5600  147.6400       9.2       357       997        97
VIS    2025250    200200   16.5400  147.5900       8.9       355       982        98
VIS    2025250    200200   16.5400  147.5900       9.0       355       981        98
VIS    2025250    200200   16.5500  147.5000       8.3       350       940        95
VIS    2025250    200200   16.5400  147.4800       8.8       354       955        94
VIS    2025250    200200   16.5500  147.4600       9.0       354       917        95
VIS    2025250    200200   16.5500  147.4200       9.3       353       917        99
VIS    2025250    200200   16.5400  147.4100       9.3       352       917        99
VIS    2025250    200200   16.5500  147.3900       8.9       348       898        96
VIS    2025250    200200   16.5400  147.3700       8.9       339       889        94
VIS    2025250    200200   16.5400  147.3400       9.0       338       873        94
VIS    2025250    200200   16.5500  147.3000       8.3       344       873        96
VIS    2025250    200200   16.5500  147.2900       8.4       342       873        94
VIS    2025250    200200   16.5400  147.2700       8.1       340       866        94
VIS    2025250    200200   16.5500  147.2300       8.2       348       797        93
VIS    2025250    200200   16.5500  147.2000       7.8       347       822        97
VIS    2025250    200200   16.5500  147.2000       7.6       347       822        98
VIS    2025250    200200   16.5500  147.1500       7.0       349       777        94
VIS    2025250    200200   16.5400  147.1400       7.2       345       769        92
VIS    2025250    200200   16.5400  147.1200       7.2       342       769        91
VIS    2025250    200200   16.5300  147.1000       5.8       345       769        93
VIS    2025250    200200   16.5300  147.0700       5.5       343       752        93
VIS    2025250    200200   16.5000  142.3000       7.1       160       731        98
VIS    2025250    200200   16.5200  142.2300       5.8       171       953        91
VIS    2025250    200200   16.5000  142.2000       6.4       168       981        95
VIS    2025250    200200   16.5400  148.7900       9.0         3       981        97
VIS    2025250    200200   16.5400  148.7600       8.6         8       979        98
VIS    2025250    200200   16.5200  148.7300       8.0        12       979        95
VIS    2025250    200200   16.5300  148.7300       8.0        12       968        96
VIS    2025250    200200   16.5200  148.7000       7.9        11       962        95
VIS    2025250    200200   16.5400  148.6600       8.1        12       962        95
VIS    2025250    200200   16.5300  148.6500       8.0        13       960        96
VIS    2025250    200200   16.5400  148.6100       8.3         9       978        97
VIS    2025250    200200   16.5300  148.5600       8.5         7       973        98
VIS    2025250    200200   16.5300  148.5300       9.1         6       971        95
VIS    2025250    200200   16.5400  148.5000       9.1         6       962        98
VIS    2025250    200200   16.5200  148.4600       8.4         7       966        98
VIS    2025250    200200   16.5200  148.4600       8.4         7       966        98
VIS    2025250    200200   16.5300  148.4300       8.5         9       948        99
VIS    2025250    200200   16.5200  148.3900       8.4        10       941       100
VIS    2025250    200200   16.5200  148.3800       8.4        11       941       100
VIS    2025250    200200   16.5400  148.3000       8.3         2       949        97
VIS    2025250    200200   16.5300  148.2800       8.3         2       963        94
VIS    2025250    200200   16.5300  148.2600       8.4         2       974        94
VIS    2025250    200200   16.5200  148.0900       7.0         9      1000        94
VIS    2025250    200200   16.5200  147.6400       8.9       357       983        97
VIS    2025250    200200   16.5100  147.6100       8.9       356       980        97
VIS    2025250    200200   16.5300  147.5900       9.0       355       980        98
VIS    2025250    200200   16.5200  147.5700       9.1       354       972        98
VIS    2025250    200200   16.5100  147.5600       9.2       354       967        98
VIS    2025250    200200   16.5200  147.5100       8.9       350       974        95
VIS    2025250    200200   16.5200  147.4600       9.1       356       968        97
VIS    2025250    200200   16.5300  147.4600       9.1       356       955        97
VIS    2025250    200200   16.5100  147.3900       9.5       353       928        95
VIS    2025250    200200   16.5100  147.3700       9.0       348       928        92
VIS    2025250    200200   16.5100  147.3600       8.8       344       899        91
VIS    2025250    200200   16.5100  147.2700       8.5       335       874        92
VIS    2025250    200200   16.5100  147.2400       8.6       340       812        91
VIS    2025250    200200   16.5100  147.1000       6.4       346       752        90
VIS    2025250    200200   16.4800  142.3000       7.2       161       731        98
VIS    2025250    200200   16.4700  142.2900       7.4       161       765        99
VIS    2025250    200200   16.4700  142.2500       7.6       175       944        92
VIS    2025250    200200   16.4700  142.2300       7.2       173       960        91
VIS    2025250    200200   16.4700  142.2000       7.6       169       916        95
VIS    2025250    200200   16.4700  142.1900       7.9       168       916        94
VIS    2025250    200200   16.5100  148.7900       6.9        15       973        96
VIS    2025250    200200   16.5100  148.7500       8.0        11       979        97
VIS    2025250    200200   16.5200  148.7300       7.9        12       968        96
VIS    2025250    200200   16.5200  148.7200       7.9        12       965        96
VIS    2025250    200200   16.5100  148.7000       7.7        12       965        95
VIS    2025250    200200   16.5100  148.6600       8.1        12       962        96
VIS    2025250    200200   16.5100  148.6300       7.9        14       962        96
VIS    2025250    200200   16.5100  148.6200       7.9        14       965        96
VIS    2025250    200200   16.5100  148.5800       8.2         9       985        96
VIS    2025250    200200   16.5000  148.5700       8.0        10       985        95
VIS    2025250    200200   16.5000  148.5300       7.9         7       970        96
VIS    2025250    200200   16.5000  148.5200       7.9         6       970        97
VIS    2025250    200200   16.5000  148.4800       8.1         5       971        98
VIS    2025250    200200   16.5100  148.4800       8.2         5       971        98
VIS    2025250    200200   16.5100  148.4500       8.4         7       966        98
VIS    2025250    200200   16.5000  148.4200       8.4         8       941        99
VIS    2025250    200200   16.5100  148.3900       8.4        10       939       100
VIS    2025250    200200   16.5000  148.3700       8.3         9       934       100
VIS    2025250    200200   16.5100  148.2400       8.7         0       989        99
VIS    2025250    200200   16.5000  147.6300       8.7       357       986        95
VIS    2025250    200200   16.5100  147.6200       8.8       356       980        96
VIS    2025250    200200   16.5000  147.5800       9.2       355       974        96
VIS    2025250    200200   16.5100  147.5600       9.2       355       972        96
VIS    2025250    200200   16.5100  147.5500       9.2       354       967        97
VIS    2025250    200200   16.5000  147.5300       9.0       351       967        98
VIS    2025250    200200   16.5100  147.5000       8.8       350       988        98
VIS    2025250    200200   16.5000  147.4100       9.4       356       928        97
VIS    2025250    200200   16.5000  147.3800       9.4       351       936        93
VIS    2025250    200200   16.5000  147.3800       9.3       350       928        91
VIS    2025250    200200   16.5000  147.3100       8.6       337       886        90
VIS    2025250    200200   16.5000  147.2600       8.6       337       874        93
VIS    2025250    200200   16.5000  147.2600       8.7       337       874        94
VIS    2025250    200200   16.4900  147.2200       9.1       344       808        90
VIS    2025250    200200   16.4900  147.0000       8.0       340       885        97
VIS    2025250    200200   16.4800  146.9500       7.1       336       973        93
VIS    2025250    200200   16.4900  146.7400       6.1       328       756        90
VIS    2025250    200200   16.4800  146.7200       6.7       331       756        97
VIS    2025250    200200   16.4800  146.7000       5.8       335       756        96
VIS    2025250    200200   16.4600  142.2900       7.4       165       765        98
VIS    2025250    200200   16.4500  142.1900       7.8       171       910        90
VIS    2025250    200200   16.4700  142.1900       8.2       168       916        93
VIS    2025250    200200   16.4800  148.7700       7.9        11       977        97
VIS    2025250    200200   16.4900  148.7400       7.8        11       977        95
VIS    2025250    200200   16.4900  148.7300       7.8        11       973        96
VIS    2025250    200200   16.4900  148.7000       7.5        13       968        94
VIS    2025250    200200   16.4800  148.6900       7.7        12       968        96
VIS    2025250    200200   16.4800  148.6500       8.1        15       959        97
VIS    2025250    200200   16.4700  148.6200       8.0        17       959        95
VIS    2025250    200200   16.4800  148.6100       7.8        16       968        95
VIS    2025250    200200   16.4700  148.5700       8.1         9       975        97
VIS    2025250    200200   16.4700  148.5600       8.0         9       975        96
VIS    2025250    200200   16.4700  148.5300       7.7         9       965        97
VIS    2025250    200200   16.4800  148.5000       7.8         4       970        96
VIS    2025250    200200   16.4800  148.4900       7.8         4       971        97
VIS    2025250    200200   16.4900  148.4600       7.9         5       974        95
VIS    2025250    200200   16.4800  148.4000       8.3         6       951        95
VIS    2025250    200200   16.4800  148.3900       8.3         7       949        95
VIS    2025250    200200   16.4800  148.3400       8.4         7       940        98
VIS    2025250    200200   16.4700  148.3200       8.7         5       965        98
VIS    2025250    200200   16.4800  147.6400       8.7       357       992        92
VIS    2025250    200200   16.4800  147.6100       8.7       355       977        95
VIS    2025250    200200   16.4700  147.5900       8.8       353       977        97
VIS    2025250    200200   16.4800  147.5800       9.1       354       976        96
VIS    2025250    200200   16.4700  147.5400       9.2       354       974        97
VIS    2025250    200200   16.4700  147.5100       9.1       352       969        98
VIS    2025250    200200   16.4700  147.5000       9.1       351       969        99
VIS    2025250    200200   16.4700  147.4700       8.9       352       979        99
VIS    2025250    200200   16.4600  147.4600       9.0       352       975        99
VIS    2025250    200200   16.4600  147.4200       9.6       353       988        97
VIS    2025250    200200   16.4600  147.4000      10.0       355       995        96
VIS    2025250    200200   16.4600  147.3700       9.8       354       995        97
VIS    2025250    200200   16.4600  147.3400       9.2       349       995        93
VIS    2025250    200200   16.4700  147.3200       8.8       343       980        93
VIS    2025250    200200   16.4700  147.3000       8.9       344       980        97
VIS    2025250    200200   16.4700  147.2800       8.8       345       955        96
VIS    2025250    200200   16.4700  147.2500       9.1       344       914        97
VIS    2025250    200200   16.4600  147.2200       9.5       344       855        96
VIS    2025250    200200   16.4600  147.2000       9.6       344       817        91
VIS    2025250    200200   16.4800  147.1200       8.5       345       788        90
VIS    2025250    200200   16.4600  147.1000       8.0       345       829        97
VIS    2025250    200200   16.4700  147.0700       7.8       343       780        90
VIS    2025250    200200   16.4600  147.0000       7.7       345       793        91
VIS    2025250    200200   16.4700  146.9900       8.2       340       885        98
VIS    2025250    200200   16.4600  146.9700       8.3       338       887        95
VIS    2025250    200200   16.4800  146.9400       7.5       334       973        92
VIS    2025250    200200   16.4500  146.7200       8.2       334       824        92
VIS    2025250    200200   16.4600  146.7000       7.6       335       817        94
VIS    2025250    200200   16.4600  146.6700       6.5       330       824        91
VIS    2025250    200200   16.4600  146.6600       7.1       330       836        94
VIS    2025250    200200   16.4300  142.2600       7.0       166       846        98
VIS    2025250    200200   16.4200  142.2300       6.6       169       952        90
VIS    2025250    200200   16.4900  151.7100       6.2        57       983        97
VIS    2025250    200200   16.4700  148.7600       7.8        10       977        96
VIS    2025250    200200   16.4600  148.7300       7.8         9       972        95
VIS    2025250    200200   16.4500  148.7000       7.9         9       968        96
VIS    2025250    200200   16.4600  148.6600       7.9        12       956        97
VIS    2025250    200200   16.4500  148.6400       7.8        16       950        96
VIS    2025250    200200   16.4700  148.6100       8.0        15       965        95
VIS    2025250    200200   16.4500  148.6100       8.1        13       953        97
VIS    2025250    200200   16.4500  148.5800       8.5         7       969        98
VIS    2025250    200200   16.4500  148.5500       8.0         8       964        96
VIS    2025250    200200   16.4700  148.5300       7.8         9       964        97
VIS    2025250    200200   16.4600  148.5000       7.8         6       968        96
VIS    2025250    200200   16.4700  148.4900       7.9         4       970        98
VIS    2025250    200200   16.4500  148.4500       7.9        10       968        97
VIS    2025250    200200   16.4700  148.4200       8.2         6       968        95
VIS    2025250    200200   16.4700  148.4100       8.3         6       965        95
VIS    2025250    200200   16.4600  148.3500       8.6         5       965        96
VIS    2025250    200200   16.4600  148.3300       8.7         5       965        97
VIS    2025250    200200   16.4600  147.9600       5.6       354       997        91
VIS    2025250    200200   16.4400  147.6200       8.4       354       992        98
VIS    2025250    200200   16.4400  147.5900       8.4       351       990        98
VIS    2025250    200200   16.4500  147.5600       9.0       353       992        98
VIS    2025250    200200   16.4600  147.5100       9.1       352       969        98
VIS    2025250    200200   16.4400  147.4800       9.1       352       971        98
VIS    2025250    200200   16.4400  147.4500       8.9       352       970        99
VIS    2025250    200200   16.4400  147.4400       8.8       352       973        99
VIS    2025250    200200   16.4400  147.4200       8.9       352       973        99
VIS    2025250    200200   16.4500  147.3800       9.7       356       995        97
VIS    2025250    200200   16.4400  147.3700       9.9       353       995        98
VIS    2025250    200200   16.4400  147.3400       9.7       350       981        99
VIS    2025250    200200   16.4400  147.3000       9.6       347       981       100
VIS    2025250    200200   16.4400  147.2800       9.0       347       965        99
VIS    2025250    200200   16.4400  147.2700       8.9       345       965        99
VIS    2025250    200200   16.4500  147.2400       9.0       344       914       100
VIS    2025250    200200   16.4300  147.2200       9.0       344       909        99
VIS    2025250    200200   16.4300  147.1800       9.6       343       830        91
VIS    2025250    200200   16.4300  147.1800       9.7       342       826        90
VIS    2025250    200200   16.4400  147.1200       8.1       341       816        93
VIS    2025250    200200   16.4400  147.0900       7.2       342       829        98
VIS    2025250    200200   16.4300  147.0800       6.7       340       829        97
VIS    2025250    200200   16.4400  147.0500       5.7       344       782        93
VIS    2025250    200200   16.4500  147.0200       7.0       348       784        91
VIS    2025250    200200   16.4500  146.9400       7.6       334       931        92
VIS    2025250    200200   16.4300  146.9300       7.2       333       931        90
VIS    2025250    200200   16.4400  146.8500       6.5       327       970        93
VIS    2025250    200200   16.4400  146.7900       7.6       338       865        98
VIS    2025250    200200   16.4400  146.7800       8.4       338       841        95
VIS    2025250    200200   16.4500  146.7500       7.8       334       822        92
VIS    2025250    200200   16.4500  146.7200       8.2       335       825        91
VIS    2025250    200200   16.4500  146.7100       8.2       335       838        92
VIS    2025250    200200   16.4300  146.6800       8.6       334       868        96
VIS    2025250    200200   16.4300  146.6500       7.2       334       850        93
VIS    2025250    200200   16.4300  146.6300       6.8       338       842        93
VIS    2025250    200200   16.4300  146.5600       6.9       316       889        92
VIS    2025250    200200   16.4100  142.2500       7.4       167       824        98
VIS    2025250    200200   16.4200  142.2100       6.4       169       924        90
VIS    2025250    200200   16.4600  151.6900       5.9        38       985        90
VIS    2025250    200200   16.4400  148.7000       8.1         8       962        97
VIS    2025250    200200   16.4400  148.6900       8.0         8       958        98
VIS    2025250    200200   16.4300  148.6500       7.7        14       945        97
VIS    2025250    200200   16.4200  148.6300       7.7        14       926        98
VIS    2025250    200200   16.4200  148.6000       8.0        13       924        99
VIS    2025250    200200   16.4200  148.5800       8.2         8       950        99
VIS    2025250    200200   16.4400  148.5600       8.3         7       964        98
VIS    2025250    200200   16.4400  148.5300       7.8         9       968        95
VIS    2025250    200200   16.4400  148.5100       7.8         7       968        93
VIS    2025250    200200   16.4400  148.5000       7.9         6       968        93
VIS    2025250    200200   16.4200  148.4500       8.2        12       968        96
VIS    2025250    200200   16.4200  148.4500       8.2        12       967        96
VIS    2025250    200200   16.4400  148.4100       8.4         6       951        97
VIS    2025250    200200   16.4400  148.4000       8.5         5       951        98
VIS    2025250    200200   16.4200  147.9200       7.3       349       999        91
VIS    2025250    200200   16.4300  147.6100       8.4       353       992        98
VIS    2025250    200200   16.4200  147.6000       8.4       352       994        98
VIS    2025250    200200   16.4200  147.5600       8.7       352       992        98
VIS    2025250    200200   16.4300  147.5600       8.8       352       992        98
VIS    2025250    200200   16.4100  147.5200       9.0       354       988        98
VIS    2025250    200200   16.4100  147.5100       9.0       354       979        99
VIS    2025250    200200   16.4300  147.4800       9.0       353       971        98
VIS    2025250    200200   16.4200  147.4500       8.8       352       967        99
VIS    2025250    200200   16.4100  147.4300       8.9       352       963        99
VIS    2025250    200200   16.4100  147.4000       9.2       351       973        99
VIS    2025250    200200   16.4200  147.3700       9.5       351       974        99
VIS    2025250    200200   16.4100  147.3500       9.4       350       952        99
VIS    2025250    200200   16.4100  147.3400       9.2       350       952       100
VIS    2025250    200200   16.4300  147.3100       9.6       348       973       100
VIS    2025250    200200   16.4300  147.2900       9.4       347       962       100
VIS    2025250    200200   16.4200  147.2500       9.1       344       947        98
VIS    2025250    200200   16.4100  147.2400       8.9       344       945        96
VIS    2025250    200200   16.4300  147.2000       9.0       344       885        98
VIS    2025250    200200   16.4200  147.2000       9.0       343       885        99
VIS    2025250    200200   16.4100  147.1600       9.9       343       907        99
VIS    2025250    200200   16.4100  147.1400       9.3       341       843        92
VIS    2025250    200200   16.4200  147.1000       7.7       341       836        97
VIS    2025250    200200   16.4200  147.0900       6.9       342       829        97
VIS    2025250    200200   16.4200  147.0600       6.0       339       806        94
VIS    2025250    200200   16.4200  146.9200       7.4       336       894        93
VIS    2025250    200200   16.4100  146.8600       9.1       335       944        95
VIS    2025250    200200   16.4200  146.8500       8.7       330       970        92
VIS    2025250    200200   16.4100  146.8200       8.7       334       944        96
VIS    2025250    200200   16.4100  146.7900       8.3       337       862        98
VIS    2025250    200200   16.4100  146.7800       8.5       337       860        96
VIS    2025250    200200   16.4200  146.7000       9.1       335       850        92
VIS    2025250    200200   16.4200  146.6800       8.5       336       872        98
VIS    2025250    200200   16.4300  146.6600       7.9       335       854        94
VIS    2025250    200200   16.4100  146.6300       7.9       340       893        97
VIS    2025250    200200   16.4100  146.6100       8.1       339       900        93
VIS    2025250    200200   16.4100  146.5800       8.6       330       900        98
VIS    2025250    200200   16.4100  146.5500       6.6       314       842        91
VIS    2025250    200200   16.4000  142.2400       7.6       168       856        94
VIS    2025250    200200   16.3900  142.2100       6.1       169       916        96
VIS    2025250    200200   16.3900  142.2000       5.6       167       924        96
VIS    2025250    200200   16.4100  148.7000       8.5         8       962        94
VIS    2025250    200200   16.4100  148.7000       8.5         9       962        93
VIS    2025250    200200   16.4200  148.6700       7.8        10       954        98
VIS    2025250    200200   16.4200  148.6300       7.7        14       926        98
VIS    2025250    200200   16.4200  148.6100       7.8        14       922        98
VIS    2025250    200200   16.4000  148.5900       7.6        16       924        97
VIS    2025250    200200   16.4100  148.5700       8.0         9       950        98
VIS    2025250    200200   16.4000  148.5500       7.9         9       959        97
VIS    2025250    200200   16.4000  148.5100       7.9         7       977        96
VIS    2025250    200200   16.4200  148.4900       7.8         7       970        96
VIS    2025250    200200   16.4200  148.4600       8.1        12       968        96
VIS    2025250    200200   16.4100  148.4400       8.2        13       938        99
VIS    2025250    200200   16.4100  148.4200       8.2        13       922        99
VIS    2025250    200200   16.4000  148.3900       8.2         5       949        99
VIS    2025250    200200   16.4000  148.3800       8.2         5       949        99
VIS    2025250    200200   16.4100  148.3400       8.5       359       989        99
VIS    2025250    200200   16.4100  147.9200       7.5       349       999        90
VIS    2025250    200200   16.3900  147.7900       7.2       347       996        98
VIS    2025250    200200   16.4000  147.5800       8.7       351       997        98
VIS    2025250    200200   16.4100  147.5600       8.8       351       994        97
VIS    2025250    200200   16.4100  147.5300       8.9       354       988        98
VIS    2025250    200200   16.4100  147.5200       8.9       354       988        98
VIS    2025250    200200   16.4000  147.4800       8.8       353       975        99
VIS    2025250    200200   16.4000  147.4800       8.7       353       975        99
VIS    2025250    200200   16.4100  147.4300       8.8       351       963        99
VIS    2025250    200200   16.3900  147.4000       9.1       351       970        98
VIS    2025250    200200   16.3900  147.3600       8.8       349       969        96
VIS    2025250    200200   16.3900  147.3300       8.7       349       952        94
VIS    2025250    200200   16.3900  147.3300       8.7       349       952        95
VIS    2025250    200200   16.3900  147.2900       8.9       347       940        99
VIS    2025250    200200   16.3900  147.2700       8.9       346       945        97
VIS    2025250    200200   16.4000  147.2500       9.0       346       945        94
VIS    2025250    200200   16.4000  147.2300       8.7       345       947        92
VIS    2025250    200200   16.3900  147.2000       8.7       342       969        94
VIS    2025250    200200   16.3900  147.1600       9.3       339       966        98
VIS    2025250    200200   16.3900  147.1400       8.9       340       947        98
VIS    2025250    200200   16.4000  147.1300       8.9       340       843        93
VIS    2025250    200200   16.3900  147.1100       8.3       341       853        96
VIS    2025250    200200   16.4000  147.0900       7.1       340       843        95
VIS    2025250    200200   16.3800  146.9200       8.5       336       955        98
VIS    2025250    200200   16.3800  146.9100       8.7       336       955        98
VIS    2025250    200200   16.3800  146.8800       8.8       336       910        97
VIS    2025250    200200   16.3800  146.8500       8.9       336       863        96
VIS    2025250    200200   16.3900  146.8300       8.9       334       903        98
VIS    2025250    200200   16.3800  146.8100       8.4       333       862        96
VIS    2025250    200200   16.3900  146.8000       8.4       334       862        97
VIS    2025250    200200   16.4000  146.7700       8.5       334       842        93
VIS    2025250    200200   16.4000  146.6900       9.3       338       889        91
VIS    2025250    200200   16.4000  146.6300       8.4       341       910        96
VIS    2025250    200200   16.3800  146.6000       8.8       338       910        96
VIS    2025250    200200   16.4000  146.5600       7.7       317       842        94
VIS    2025250    200200   16.3800  146.3700       5.9       317       863        95
VIS    2025250    200200   16.3800  146.3600       6.1       316       849        97
VIS    2025250    200200   16.3900  146.1500       7.1       287       722        93
VIS    2025250    200200   16.3800  146.0100       9.3       291       792        92
VIS    2025250    200200   16.3500  142.2400       7.3       174       887        92
VIS    2025250    200200   16.3600  142.2200       6.7       177       912        94
VIS    2025250    200200   16.3600  142.2000       5.8       174       939        93
VIS    2025250    200200   16.3500  142.1900       5.3       171       939        93
VIS    2025250    200200   16.4000  148.6800       8.5         9       962        95
VIS    2025250    200200   16.3900  148.6700       8.6         8       962        94
VIS    2025250    200200   16.3900  148.6300       7.7        13       925        98
VIS    2025250    200200   16.3900  148.6200       7.5        15       925        97
VIS    2025250    200200   16.3900  148.5900       7.5        16       926        97
VIS    2025250    200200   16.3700  148.5700       7.5        17       926        97
VIS    2025250    200200   16.3900  148.5400       7.9         8       961        97
VIS    2025250    200200   16.3800  148.4800       8.0        13       986        94
VIS    2025250    200200   16.3900  148.4700       8.1        12       985        95
VIS    2025250    200200   16.3700  148.4300       7.6        12       948        98
VIS    2025250    200200   16.3700  148.4300       7.5        14       945        97
VIS    2025250    200200   16.3900  148.3800       8.0        10       916        98
VIS    2025250    200200   16.3800  148.3800       8.0        12       905        98
VIS    2025250    200200   16.3800  148.3500       8.4         2       922        97
VIS    2025250    200200   16.3700  147.7800       7.4       349       993        96
VIS    2025250    200200   16.3800  147.7800       7.1       348       975        95
VIS    2025250    200200   16.3800  147.5700       8.7       351       998        98
VIS    2025250    200200   16.3800  147.5500       8.9       351       997        97
VIS    2025250    200200   16.3800  147.5200       8.9       353       980        98
VIS    2025250    200200   16.3800  147.5100       8.8       353       979        98
VIS    2025250    200200   16.3700  147.4800       8.6       352       975        98
VIS    2025250    200200   16.3800  147.4500       8.6       351       967        99
VIS    2025250    200200   16.3800  147.4300       8.8       351       967        98
VIS    2025250    200200   16.3600  147.4100       8.9       350       970        98
VIS    2025250    200200   16.3700  147.3900       8.9       351       977        97
VIS    2025250    200200   16.3800  147.3500       8.6       349       961        94
VIS    2025250    200200   16.3800  147.3400       8.6       349       961        94
VIS    2025250    200200   16.3800  147.3000       8.7       347       952        99
VIS    2025250    200200   16.3600  147.2800       8.4       345       949        97
VIS    2025250    200200   16.3700  147.2700       8.1       347       949        94
VIS    2025250    200200   16.3800  147.2000       9.0       342       973        97
VIS    2025250    200200   16.3800  147.1600       9.1       339       965        98
VIS    2025250    200200   16.3700  147.1400       8.8       342       959        97
VIS    2025250    200200   16.3800  147.1200       8.8       343       938        97
VIS    2025250    200200   16.3600  147.0800       8.4       338       853        96
VIS    2025250    200200   16.3700  147.0600       7.8       332       826        91
VIS    2025250    200200   16.3700  146.9400       8.3       335       959        91
VIS    2025250    200200   16.3800  146.9100       8.9       336       955        98
VIS    2025250    200200   16.3800  146.9000       8.9       335       952        99
VIS    2025250    200200   16.3800  146.8700       8.8       336       883        98
VIS    2025250    200200   16.3800  146.8500       9.0       337       863        96
VIS    2025250    200200   16.3800  146.8100       8.5       333       842        93
VIS    2025250    200200   16.3800  146.8100       8.4       333       842        93
VIS    2025250    200200   16.3800  146.6200       9.2       341       912        94
VIS    2025250    200200   16.3800  146.6000       8.9       339       912        95
VIS    2025250    200200   16.3600  146.5700       8.5       336       895        98
VIS    2025250    200200   16.3600  146.5500       8.7       328       841        94
VIS    2025250    200200   16.3600  146.5400       8.8       326       835        93
VIS    2025250    200200   16.3500  146.3600       5.8       302       842        90
VIS    2025250    200200   16.3500  146.2400       8.6       305       741        90
VIS    2025250    200200   16.3700  146.0400      10.2       302       806        92
VIS    2025250    200200   16.3700  146.0200       9.9       295       800        92
VIS    2025250    200200   16.3700  146.0100       9.5       293       800        93
VIS    2025250    200200   16.3700  145.9800       8.0       280       749        91
VIS    2025250    200200   16.3300  142.2800       7.2       167       758        96
VIS    2025250    200200   16.3300  142.2300       7.0       173       887        93
VIS    2025250    200200   16.3300  142.2100       6.5       176       912        94
VIS    2025250    200200   16.3300  142.2000       6.4       175       916        95
VIS    2025250    200200   16.3700  148.6600       8.4         7       971        90
VIS    2025250    200200   16.3700  148.6400       7.9         9       959        94
VIS    2025250    200200   16.3700  148.6100       7.4        13       942        97
VIS    2025250    200200   16.3500  148.5900       7.5        14       940        98
VIS    2025250    200200   16.3600  148.5800       7.5        17       924        99
VIS    2025250    200200   16.3500  148.5400       7.9        10       916        98
VIS    2025250    200200   16.3500  148.5200       7.8         9       960        97
VIS    2025250    200200   16.3600  148.5000       7.9        11       962        96
VIS    2025250    200200   16.3500  148.4800       7.8        12       965        95
VIS    2025250    200200   16.3700  148.4500       8.0        11       948        98
VIS    2025250    200200   16.3600  148.4400       7.6        12       948        98
VIS    2025250    200200   16.3700  148.3900       7.8        22       901        96
VIS    2025250    200200   16.3600  148.3700       8.3        16       902        98
VIS    2025250    200200   16.3500  148.3600       8.5        13       905        98
VIS    2025250    200200   16.3700  148.3300       8.5         2       944        99
VIS    2025250    200200   16.3600  147.7700       7.2       351       975        96
VIS    2025250    200200   16.3500  147.5100       8.7       349       990        97
VIS    2025250    200200   16.3500  147.4800       8.5       349       980        94
VIS    2025250    200200   16.3600  147.4700       8.4       350       975        96
VIS    2025250    200200   16.3400  147.4300       8.9       350       970        97
VIS    2025250    200200   16.3600  147.4200       8.9       350       970        98
VIS    2025250    200200   16.3500  147.3900       9.0       351       974        98
VIS    2025250    200200   16.3400  147.3500       8.6       352       984        99
VIS    2025250    200200   16.3400  147.3100       8.8       347       960        99
VIS    2025250    200200   16.3600  147.2800       8.3       345       949        97
VIS    2025250    200200   16.3600  147.2800       8.1       346       949        96
VIS    2025250    200200   16.3400  147.2500       7.8       345       958        93
VIS    2025250    200200   16.3400  147.2300       7.7       344       979        92
VIS    2025250    200200   16.3400  147.1800       8.8       340       975        98
VIS    2025250    200200   16.3400  147.1600       8.7       341       955        98
VIS    2025250    200200   16.3400  147.1400       8.7       342       931        99
VIS    2025250    200200   16.3500  147.1100       8.9       340       931        99
VIS    2025250    200200   16.3500  147.1000       9.0       340       926        99
VIS    2025250    200200   16.3600  147.0800       8.3       337       853        96
VIS    2025250    200200   16.3600  147.0500       7.2       332       837        93
VIS    2025250    200200   16.3500  147.0300       7.0       335       838        94
VIS    2025250    200200   16.3500  146.9200       8.8       334       964        93
VIS    2025250    200200   16.3300  146.8900       9.5       337       956        94
VIS    2025250    200200   16.3300  146.8800       9.5       339       949        96
VIS    2025250    200200   16.3300  146.8600       8.9       340       909        90
VIS    2025250    200200   16.3400  146.6000       7.9       335       940        91
VIS    2025250    200200   16.3500  146.5800       8.1       338       931        91
VIS    2025250    200200   16.3500  146.5600       8.7       334       863        97
VIS    2025250    200200   16.3500  146.5500       8.9       330       842        94
VIS    2025250    200200   16.3300  146.5300       9.3       324       852        92
VIS    2025250    200200   16.3300  146.3500       5.8       302       776        91
VIS    2025250    200200   16.3300  146.3200       5.8       306       773        92
VIS    2025250    200200   16.3400  146.2400       8.7       306       748        90
VIS    2025250    200200   16.3300  146.0200       9.1       295       807        93
VIS    2025250    200200   16.3300  146.0100       8.6       290       770        97
VIS    2025250    200200   16.3300  146.0000       8.4       289       755        94
VIS    2025250    200200   16.3200  142.2900       7.3       165       758        91
VIS    2025250    200200   16.3200  142.2800       7.3       167       758        95
VIS    2025250    200200   16.3000  142.2300       6.7       171       887        90
VIS    2025250    200200   16.3200  142.1900       6.3       177       889        93
VIS    2025250    200200   16.3500  148.6500       7.8         7       976        92
VIS    2025250    200200   16.3300  148.6300       7.1        10       975        95
VIS    2025250    200200   16.3300  148.6000       7.1        12       959        96
VIS    2025250    200200   16.3500  148.5800       7.6        13       924        99
VIS    2025250    200200   16.3400  148.5700       7.8        11       916        99
VIS    2025250    200200   16.3300  148.5300       7.8        12       917        99
VIS    2025250    200200   16.3500  148.5200       7.7        11       946        98
VIS    2025250    200200   16.3500  148.4900       7.7        11       962        95
VIS    2025250    200200   16.3300  148.4700       7.4        12       962        95
VIS    2025250    200200   16.3200  148.4300       8.0        20       937        97
VIS    2025250    200200   16.3400  148.4300       8.0        20       937        97
VIS    2025250    200200   16.3300  148.3800       9.0        22       886        96
VIS    2025250    200200   16.3300  148.3700       8.8        20       894        97
VIS    2025250    200200   16.3200  148.3300       9.0        10       911        98
VIS    2025250    200200   16.3200  148.3300       8.9         9       922        99
VIS    2025250    200200   16.3200  147.8700       8.4         7       988        96
VIS    2025250    200200   16.3200  147.8100       8.9         2       998        96
VIS    2025250    200200   16.3200  147.7800       8.5         1       992        98
VIS    2025250    200200   16.3400  147.7600       7.7       356       993        98
VIS    2025250    200200   16.3200  147.7400       8.0       357       993        99
VIS    2025250    200200   16.3300  147.4600       8.9       352       991        90
VIS    2025250    200200   16.3300  147.4400       8.9       350       974        96
VIS    2025250    200200   16.3300  147.4300       9.3       351       974        95
VIS    2025250    200200   16.3300  147.3800       8.9       349       973        99
VIS    2025250    200200   16.3100  147.3600       8.5       348       981        99
VIS    2025250    200200   16.3100  147.3500       8.4       349       982        99
VIS    2025250    200200   16.3300  147.3100       8.7       347       963        99
VIS    2025250    200200   16.3300  147.3000       8.7       346       958        99
VIS    2025250    200200   16.3200  147.2800       8.3       342       942        96
VIS    2025250    200200   16.3300  147.2600       7.9       345       946        94
VIS    2025250    200200   16.3100  147.2100       8.2       341       933        98
VIS    2025250    200200   16.3100  147.2100       8.1       341       944        98
VIS    2025250    200200   16.3100  147.1700       8.1       339       931        98
VIS    2025250    200200   16.3200  147.1500       8.0       339       931        97
VIS    2025250    200200   16.3200  147.1200       8.6       335       930        98
VIS    2025250    200200   16.3100  147.1100       8.7       334       930        98
VIS    2025250    200200   16.3100  147.0900       8.5       333       905        96
VIS    2025250    200200   16.3300  147.0600       7.7       337       841        95
VIS    2025250    200200   16.3300  147.0200       7.4       336       865        97
VIS    2025250    200200   16.3300  147.0000       7.8       336       958        90
VIS    2025250    200200   16.3300  146.8900       9.6       339       956        95
VIS    2025250    200200   16.3100  146.6500       7.6       333       872        98
VIS    2025250    200200   16.3200  146.6200       8.7       331       925        98
VIS    2025250    200200   16.3300  146.6000       7.9       332       940        93
VIS    2025250    200200   16.3300  146.5400       9.0       325       863        94
VIS    2025250    200200   16.3200  146.5300       8.7       323       863        93
VIS    2025250    200200   16.3200  146.3500       7.0       304       774        90
VIS    2025250    200200   16.3100  146.2300       7.2       304       755        93
VIS    2025250    200200   16.3200  146.2000       8.0       303       754        94
VIS    2025250    200200   16.3000  146.1800       7.7       304       758        94
VIS    2025250    200200   16.3000  146.1500       7.9       302       768        96
VIS    2025250    200200   16.3200  146.1300       8.1       302       762        93
VIS    2025250    200200   16.3000  146.0700       7.5       299       773        92
VIS    2025250    200200   16.3100  146.0400       8.5       296       795        95
VIS    2025250    200200   16.3200  146.0100       8.6       290       770        96
VIS    2025250    200200   16.3200  145.9900       8.2       285       739        93
VIS    2025250    200200   16.3000  145.8900       7.4       297       780        93
VIS    2025250    200200   16.3000  142.2200       6.4       173       887        90
VIS    2025250    200200   16.3400  151.7100       6.1        68       973        90
VIS    2025250    200200   16.3200  148.6400       7.1         9       977        94
VIS    2025250    200200   16.3100  148.6100       7.0        10       975        95
VIS    2025250    200200   16.3200  148.5900       7.2        10       940        98
VIS    2025250    200200   16.3200  148.5700       7.7         8       929        99
VIS    2025250    200200   16.3200  148.5600       7.8         6       929        99
VIS    2025250    200200   16.3100  148.5200       7.7        15       943        96
VIS    2025250    200200   16.3000  148.5000       7.5        17       950        94
VIS    2025250    200200   16.3100  148.4900       7.3        17       950        94
VIS    2025250    200200   16.3000  148.4500       7.4        16       937        98
VIS    2025250    200200   16.3200  148.4300       7.9        19       937        97
VIS    2025250    200200   16.3200  148.4000       8.9        21       886        95
VIS    2025250    200200   16.3200  148.3700       8.9        21       886        95
VIS    2025250    200200   16.3200  148.3500       8.8        17       894        96
VIS    2025250    200200   16.3200  148.3200       8.9         8       922        99
VIS    2025250    200200   16.3000  148.3100       8.8         6       911        97
VIS    2025250    200200   16.3000  148.2900       8.7         4       942        99
VIS    2025250    200200   16.3000  147.8700       8.3         6       988        96
VIS    2025250    200200   16.3100  147.8500       8.4         5       988        97
VIS    2025250    200200   16.3000  147.8200       8.6         1       991        96
VIS    2025250    200200   16.2900  147.7800       8.6         3       990        97
VIS    2025250    200200   16.3100  147.7600       8.5         1       983        97
VIS    2025250    200200   16.3100  147.7300       8.2       356       994        99
VIS    2025250    200200   16.3100  147.4500       9.3       354       997        93
VIS    2025250    200200   16.3100  147.4300       9.5       352       982        94
VIS    2025250    200200   16.3100  147.4200       9.5       352       982        95
VIS    2025250    200200   16.3100  147.3900       8.8       349       982        99
VIS    2025250    200200   16.3100  147.3600       8.3       348       982        99
VIS    2025250    200200   16.3000  147.3300       8.0       346       988        99
VIS    2025250    200200   16.3000  147.3200       8.1       345       988        99
VIS    2025250    200200   16.3100  147.2900       8.4       344       968        99
VIS    2025250    200200   16.2900  147.2700       8.8       344       974        99
VIS    2025250    200200   16.2900  147.2400       8.6       344       933        99
VIS    2025250    200200   16.3000  147.2100       8.1       341       924        98
VIS    2025250    200200   16.2900  147.2000       8.1       342       921        98
VIS    2025250    200200   16.2900  147.1700       8.0       338       917        96
VIS    2025250    200200   16.3000  147.1500       8.1       334       930        94
VIS    2025250    200200   16.3000  147.1100       8.7       334       930        96
VIS    2025250    200200   16.3000  147.0900       8.4       333       919        95
VIS    2025250    200200   16.2900  147.0600       8.4       331       917        93
VIS    2025250    200200   16.2900  147.0600       8.6       330       879        93
VIS    2025250    200200   16.2900  147.0200       9.4       330       901        97
VIS    2025250    200200   16.3000  147.0000       8.4       335       901        97
VIS    2025250    200200   16.2900  146.9600       8.1       332       914        96
VIS    2025250    200200   16.2900  146.6000       7.0       321       893        93
VIS    2025250    200200   16.2900  146.6000       6.2       313       893        91
VIS    2025250    200200   16.2800  146.4800       6.8       319       853        91
VIS    2025250    200200   16.2900  146.2200       7.0       291       770       100
VIS    2025250    200200   16.2900  146.2100       7.3       294       777       100
VIS    2025250    200200   16.3000  146.1700       7.7       306       768        96
VIS    2025250    200200   16.3000  146.1500       7.8       302       768        96
VIS    2025250    200200   16.3000  146.1000       7.1       291       770        91
VIS    2025250    200200   16.2800  146.0900       6.3       284       770        91
VIS    2025250    200200   16.2800  146.0700       6.9       289       778        98
VIS    2025250    200200   16.3000  146.0300       8.3       291       785        95
VIS    2025250    200200   16.2900  146.0100       7.8       288       770        99
VIS    2025250    200200   16.2900  145.8900       7.3       292       780        91
VIS    2025250    200200   16.2800  145.8500       6.9       290       805        90
VIS    2025250    200200   16.2600  142.2000       6.2       164       938        97
VIS    2025250    200200   16.2600  142.1900       6.4       166       918        91
VIS    2025250    200200   16.3000  148.6300       7.3         5       983        95
VIS    2025250    200200   16.3000  148.6300       7.2         6       983        95
VIS    2025250    200200   16.2800  148.5900       7.5         6       964        96
VIS    2025250    200200   16.2900  148.5600       7.6         3       957        98
VIS    2025250    200200   16.2900  148.5500       7.7         2       953        98
VIS    2025250    200200   16.3000  148.5100       7.5        14       950        95
VIS    2025250    200200   16.3000  148.5000       7.5        18       950        94
VIS    2025250    200200   16.2800  148.4700       7.5        19       950        95
VIS    2025250    200200   16.2800  148.4400       7.9        15       896       100
VIS    2025250    200200   16.2800  148.4200       8.4        15       892        99
VIS    2025250    200200   16.2900  148.4000       8.9        12       884        95
VIS    2025250    200200   16.2800  148.3800       8.6         7       883        93
VIS    2025250    200200   16.2800  148.3400       8.3         9       878        95
VIS    2025250    200200   16.2900  148.3100       8.6         7       883        93
VIS    2025250    200200   16.2900  148.3000       8.8         5       902        95
VIS    2025250    200200   16.2700  148.2600       8.0         4       942        99
VIS    2025250    200200   16.2700  148.2600       8.0         4       942       100
VIS    2025250    200200   16.2800  147.8900       8.5         3       990        97
VIS    2025250    200200   16.2900  147.8700       8.3         6       988        95
VIS    2025250    200200   16.2900  147.8500       8.1         3       988        90
VIS    2025250    200200   16.2800  147.8300       8.0         0       988        90
VIS    2025250    200200   16.2700  147.7900       8.6         2       988        97
VIS    2025250    200200   16.2700  147.7700       8.9         3       974        98
VIS    2025250    200200   16.2800  147.7600       9.0         2       974        97
VIS    2025250    200200   16.2900  147.7400       9.1         0       963        98
VIS    2025250    200200   16.2700  147.6900       9.4       359       991        97
VIS    2025250    200200   16.2900  147.4300       9.4       353       997        96
VIS    2025250    200200   16.2800  147.4100       9.2       351       993        97
VIS    2025250    200200   16.2800  147.3800       8.5       349       982        99
VIS    2025250    200200   16.2800  147.3500       8.2       348       980        99
VIS    2025250    200200   16.2800  147.3400       8.2       347       980        99
VIS    2025250    200200   16.2800  147.3100       8.5       345       988        99
VIS    2025250    200200   16.2800  147.2700       8.9       346       982        99
VIS    2025250    200200   16.2800  147.2700       8.9       345       982        99
VIS    2025250    200200   16.2800  147.2300       8.7       344       933        99
VIS    2025250    200200   16.2600  147.2000       8.9       345       944        96
VIS    2025250    200200   16.2800  147.1900       8.3       343       921        97
VIS    2025250    200200   16.2700  147.1600       8.4       339       914        96
VIS    2025250    200200   16.2800  147.1300       8.1       335       912        97
VIS    2025250    200200   16.2700  147.1200       8.1       335       930        96
VIS    2025250    200200   16.2700  147.0600       8.5       331       947        90
VIS    2025250    200200   16.2700  147.0500       8.6       331       923        90
VIS    2025250    200200   16.2800  147.0300       9.1       330       903        96
VIS    2025250    200200   16.2600  146.9800       8.9       330       903        96
VIS    2025250    200200   16.2600  146.9700       9.2       331       914        97
VIS    2025250    200200   16.2700  146.9500       8.7       332       919        98
VIS    2025250    200200   16.2800  146.9300       8.8       333       940        94
VIS    2025250    200200   16.2800  146.8700       8.7       341       962        94
VIS    2025250    200200   16.2600  146.4300       8.6       323       852        93
VIS    2025250    200200   16.2600  146.4200       8.1       321       852        92
VIS    2025250    200200   16.2600  146.2100       8.4       306       825        97
VIS    2025250    200200   16.2700  146.2000       8.1       303       797        98
VIS    2025250    200200   16.2600  146.1800       8.3       311       797        95
VIS    2025250    200200   16.2700  146.1500       7.2       299       794        90
VIS    2025250    200200   16.2600  146.0700       6.5       279       778        95
VIS    2025250    200200   16.2600  146.0500       6.5       277       780        92
VIS    2025250    200200   16.2600  146.0300       6.7       279       782        95
VIS    2025250    200200   16.2500  145.9200       6.9       270       730        94
VIS    2025250    200200   16.2700  145.9100       7.1       276       735        92
VIS    2025250    200200   16.2700  145.8400       7.4       290       816        95
VIS    2025250    200200   16.2500  142.1900       6.1       165       938        98
VIS    2025250    200200   16.2900  151.7000       6.0        55       991        94
VIS    2025250    200200   16.3000  151.6700       5.8        46       992        95
VIS    2025250    200200   16.2600  148.9200       6.7        24       973        91
VIS    2025250    200200   16.2500  148.6600       7.9       349       932        90
VIS    2025250    200200   16.2500  148.6600       8.0       349       955        92
VIS    2025250    200200   16.2500  148.6100       7.1       359       992        91
VIS    2025250    200200   16.2700  148.5900       7.5         6       964        96
VIS    2025250    200200   16.2700  148.5800       7.5         6       964        97
VIS    2025250    200200   16.2500  148.5400       7.6         6       957        97
VIS    2025250    200200   16.2600  148.5400       7.5         5       960        97
VIS    2025250    200200   16.2500  148.5100       7.8         8       960        98
VIS    2025250    200200   16.2500  148.4700       7.7        13       893        99
VIS    2025250    200200   16.2600  148.4400       7.6        14       893       100
VIS    2025250    200200   16.2600  148.4300       7.9        16       892       100
VIS    2025250    200200   16.2600  148.4100       8.3        16       892        99
VIS    2025250    200200   16.2700  148.3700       8.6         6       882        94
VIS    2025250    200200   16.2700  148.3700       8.5         5       882        94
VIS    2025250    200200   16.2700  148.3300       8.4         9       875        95
VIS    2025250    200200   16.2600  148.3100       8.4         9       873        95
VIS    2025250    200200   16.2700  148.2800       8.3         5       891        93
VIS    2025250    200200   16.2700  148.2600       8.0         5       922        99
VIS    2025250    200200   16.2600  148.2200       7.6         5       942        98
VIS    2025250    200200   16.2600  148.2000       7.7         2       966        98
VIS    2025250    200200   16.2500  148.1800       7.6       360       971        96
VIS    2025250    200200   16.2500  148.1200       8.1       353       959       100
VIS    2025250    200200   16.2600  147.8100       8.1       359       992        91
VIS    2025250    200200   16.2700  147.7900       8.8         2       978        97
VIS    2025250    200200   16.2600  147.7700       8.8         1       957        96
VIS    2025250    200200   16.2500  147.7400       9.1         0       920        99
VIS    2025250    200200   16.2600  147.7000       9.6       360       893       100
VIS    2025250    200200   16.2600  147.6800       9.2       360       991        96
VIS    2025250    200200   16.2400  147.6500       8.3       359       936        97
VIS    2025250    200200   16.2400  147.6200       8.5       357       966        96
VIS    2025250    200200   16.2400  147.6000       8.7       358       966        95
VIS    2025250    200200   16.2400  147.5600       8.8       358       966        93
VIS    2025250    200200   16.2400  147.3700       8.5       349       965        97
VIS    2025250    200200   16.2400  147.3600       8.4       349       965        97
VIS    2025250    200200   16.2600  147.3200       8.7       347       966        98
VIS    2025250    200200   16.2400  147.2700       8.7       345       960        97
VIS    2025250    200200   16.2400  147.2700       8.7       346       967        97
VIS    2025250    200200   16.2600  147.2400       8.8       346       973        96
VIS    2025250    200200   16.2600  147.2100       8.9       346       944        97
VIS    2025250    200200   16.2600  147.1800       8.7       345       921        97
VIS    2025250    200200   16.2500  147.1700       8.7       345       919        99
VIS    2025250    200200   16.2400  147.1400       8.6       341       906       100
VIS    2025250    200200   16.2500  147.0700       8.0       337       972        92
VIS    2025250    200200   16.2600  146.9800       8.8       330       910        96
VIS    2025250    200200   16.2600  146.9600       9.0       332       914        97
VIS    2025250    200200   16.2500  146.9300       8.1       335       938        94
VIS    2025250    200200   16.2400  146.9200       7.3       337       919        91
VIS    2025250    200200   16.2400  146.8700       6.5       341       946        94
VIS    2025250    200200   16.2400  146.8500       6.8       337       961        96
VIS    2025250    200200   16.2500  146.8300       7.8       333       976        92
VIS    2025250    200200   16.2400  146.7800       9.1       332       981        97
VIS    2025250    200200   16.2400  146.5500       5.9       316       820        92
VIS    2025250    200200   16.2500  146.4300       8.9       325       852        92
VIS    2025250    200200   16.2400  146.2700       9.3       311       903        93
VIS    2025250    200200   16.2300  146.2300       9.1       314       913        93
VIS    2025250    200200   16.2400  146.2100       8.5       310       854        92
VIS    2025250    200200   16.2500  146.2000       8.0       309       843        95
VIS    2025250    200200   16.2500  146.0800       6.4       279       781        94
VIS    2025250    200200   16.2500  146.0300       6.4       278       780        95
VIS    2025250    200200   16.2500  145.9200       6.8       268       730        93
VIS    2025250    200200   16.2100  142.2000       7.4       176       950        93
VIS    2025250    200200   16.2700  151.7200       5.9        63       991        91
VIS    2025250    200200   16.2800  151.6800       5.9        43       992        90
VIS    2025250    200200   16.2800  151.6800       6.0        42       960        90
VIS    2025250    200200   16.2400  148.8900       6.9        30       961        91
VIS    2025250    200200   16.2400  148.8100       7.5        29       965        93
VIS    2025250    200200   16.2300  148.7700       7.9        29       946        91
VIS    2025250    200200   16.2300  148.7500       7.9        20       946        90
VIS    2025250    200200   16.2400  148.7200       7.0        10       959        97
VIS    2025250    200200   16.2400  148.7000       6.6         6       932       100
VIS    2025250    200200   16.2500  148.6600       8.3       352       932        92
VIS    2025250    200200   16.2500  148.6500       7.9       349       955        94
VIS    2025250    200200   16.2500  148.6100       7.2       358       992        92
VIS    2025250    200200   16.2400  148.5800       7.6         2       959        94
VIS    2025250    200200   16.2500  148.5600       7.6         5       953        97
VIS    2025250    200200   16.2500  148.5500       7.6         7       953        97
VIS    2025250    200200   16.2300  148.5300       7.6         8       948        96
VIS    2025250    200200   16.2500  148.5000       7.9         8       960        98
VIS    2025250    200200   16.2500  148.4600       7.7        12       889        98
VIS    2025250    200200   16.2500  148.4600       7.7        12       889        96
VIS    2025250    200200   16.2400  148.4100       8.0        18       840        92
VIS    2025250    200200   16.2300  148.3800       8.6        14       846        90
VIS    2025250    200200   16.2400  148.3200       8.2         9       822        90
VIS    2025250    200200   16.2400  148.2700       8.0        16       833        90
VIS    2025250    200200   16.2400  148.2400       7.8        11       891        95
VIS    2025250    200200   16.2400  148.2300       7.7         9       920        96
VIS    2025250    200200   16.2300  148.1900       7.5         2       925        98
VIS    2025250    200200   16.2300  148.1900       7.5         1       932        97
VIS    2025250    200200   16.2400  148.1600       7.5       356       959        96
VIS    2025250    200200   16.2300  148.1300       7.9       355       956       100
VIS    2025250    200200   16.2200  148.1000       8.0       350       942        99
VIS    2025250    200200   16.2300  148.0900       7.8       349       942        99
VIS    2025250    200200   16.2400  148.0700       7.0       346       955        95
VIS    2025250    200200   16.2200  147.8100       8.1       358       974        97
VIS    2025250    200200   16.2400  147.7700       8.6         1       937        96
VIS    2025250    200200   16.2400  147.7500       8.6         0       920        98
VIS    2025250    200200   16.2300  147.7200       8.8       359       913        96
VIS    2025250    200200   16.2400  147.7100       8.9       359       893       100
VIS    2025250    200200   16.2200  147.6700       8.1       356       930        98
VIS    2025250    200200   16.2400  147.6500       8.2       359       936        97
VIS    2025250    200200   16.2400  147.6200       8.3       357       936        97
VIS    2025250    200200   16.2400  147.6200       8.5       356       966        97
VIS    2025250    200200   16.2200  147.5900       8.4       354       950        94
VIS    2025250    200200   16.2200  147.5200       7.9       344       976        99
VIS    2025250    200200   16.2200  147.5200       8.1       346       976        97
VIS    2025250    200200   16.2200  147.4200       8.5       349       967        98
VIS    2025250    200200   16.2400  147.3800       8.5       348       965        98
VIS    2025250    200200   16.2400  147.3600       8.4       348       962        98
VIS    2025250    200200   16.2400  147.3500       8.5       348       962        98
VIS    2025250    200200   16.2300  147.2900       8.5       345       950        98
VIS    2025250    200200   16.2400  147.2800       8.6       345       955        98
VIS    2025250    200200   16.2300  147.2400       8.2       344       974        96
VIS    2025250    200200   16.2300  147.2300       8.1       343       972        97
VIS    2025250    200200   16.2200  147.1800       8.2       339       950        99
VIS    2025250    200200   16.2300  147.1600       8.8       342       919       100
VIS    2025250    200200   16.2200  147.1300       9.3       341       934        98
VIS    2025250    200200   16.2200  147.1100       9.0       339       936        99
VIS    2025250    200200   16.2300  147.1000       8.1       338       941        99
VIS    2025250    200200   16.2300  147.0800       7.5       336       972        93
VIS    2025250    200200   16.2300  146.9000       6.9       340       868        96
VIS    2025250    200200   16.2300  146.8900       7.1       342       868        99
VIS    2025250    200200   16.2300  146.8600       6.8       341       950        96
VIS    2025250    200200   16.2300  146.8300       8.2       335       961        98
VIS    2025250    200200   16.2100  146.8100       9.1       336       961        98
VIS    2025250    200200   16.2100  146.7900       9.3       336       965        98
VIS    2025250    200200   16.2100  146.7400       9.0       330       957        97
VIS    2025250    200200   16.2200  146.4800       6.5       313       963        94
VIS    2025250    200200   16.2200  146.3200       8.6       312       893        93
VIS    2025250    200200   16.2300  146.2900       8.6       308       908        93
VIS    2025250    200200   16.2300  146.2700       9.1       309       903        91
VIS    2025250    200200   16.2200  146.2600       9.4       311       919        93
VIS    2025250    200200   16.2300  146.2300       8.9       313       913        92
VIS    2025250    200200   16.2100  146.0600       6.0       282       840        91
VIS    2025250    200200   16.2000  145.8000       7.9       286       867        92
VIS    2025250    200200   16.1900  142.2000       7.3       176       928        95
VIS    2025250    200200   16.1800  142.1900       7.2       177       928        93
VIS    2025250    200200   16.2600  151.7200       5.9        64       991        95
VIS    2025250    200200   16.2600  151.6900       6.0        45       985        94
VIS    2025250    200200   16.2400  151.6800       6.5        33       960        95
VIS    2025250    200200   16.2200  148.8900       7.1        26       957        94
VIS    2025250    200200   16.2100  148.8500       7.0        16       943        98
VIS    2025250    200200   16.2100  148.8200       7.8        24       942        97
VIS    2025250    200200   16.2100  148.8100       7.8        25       942        96
VIS    2025250    200200   16.2300  148.7800       8.1        36       946        91
VIS    2025250    200200   16.2200  148.7400       8.3        18       946        90
VIS    2025250    200200   16.2100  148.7200       8.6         9       900        92
VIS    2025250    200200   16.2100  148.7000       8.2         7       907        95
VIS    2025250    200200   16.2200  148.6900       7.5         9       918        99
VIS    2025250    200200   16.2300  148.6700       8.0         3       930        98
VIS    2025250    200200   16.2100  148.6300       7.2       354       915        92
VIS    2025250    200200   16.2100  148.6000       6.8       356       931        94
VIS    2025250    200200   16.2100  148.5800       6.9         0       934        93
VIS    2025250    200200   16.2200  148.5600       7.4         4       934        93
VIS    2025250    200200   16.2200  148.5400       7.5         7       934        95
VIS    2025250    200200   16.2200  148.5000       7.7        11       936        98
VIS    2025250    200200   16.2200  148.4800       8.0         8       882        91
VIS    2025250    200200   16.2100  148.4000       8.0        13       838        91
VIS    2025250    200200   16.2200  148.3800       8.2        15       840        90
VIS    2025250    200200   16.2100  148.3700       8.3        13       840        90
VIS    2025250    200200   16.2100  148.2300       7.9         8       919        98
VIS    2025250    200200   16.2100  148.2300       8.1         6       920        96
VIS    2025250    200200   16.2200  148.1900       7.6         2       925        96
VIS    2025250    200200   16.2100  148.1800       7.6         0       925        96
VIS    2025250    200200   16.2200  148.1500       7.4       357       941        97
VIS    2025250    200200   16.2100  148.1300       7.5       356       935       100
VIS    2025250    200200   16.2200  148.1000       7.8       348       942        99
VIS    2025250    200200   16.2100  148.0800       7.4       347       942        98
VIS    2025250    200200   16.2100  147.8100       8.0       358       974        97
VIS    2025250    200200   16.2200  147.8100       8.1       358       974        97
VIS    2025250    200200   16.2100  147.7700       7.9         2       952        97
VIS    2025250    200200   16.2000  147.7500       8.3         1       940        96
VIS    2025250    200200   16.2000  147.7300       8.4         3       922        95
VIS    2025250    200200   16.2000  147.7000       8.0         1       922        95
VIS    2025250    200200   16.2000  147.6800       8.1       356       930        97
VIS    2025250    200200   16.2000  147.6600       8.2       355       930        98
VIS    2025250    200200   16.2100  147.6300       8.1       355       921        97
VIS    2025250    200200   16.2100  147.6100       8.2       353       913        98
VIS    2025250    200200   16.2000  147.5700       8.1       351       913        99
VIS    2025250    200200   16.2000  147.5400       7.7       348       958        99
VIS    2025250    200200   16.2000  147.5400       7.7       346       958        99
VIS    2025250    200200   16.2100  147.4300       8.5       347       974        95
VIS    2025250    200200   16.1900  147.3600       8.0       344       946        99
VIS    2025250    200200   16.2100  147.3100       8.3       347       952        99
VIS    2025250    200200   16.2100  147.3000       8.5       345       954        98
VIS    2025250    200200   16.1900  147.2600       8.0       343       957        99
VIS    2025250    200200   16.2000  147.2500       8.1       344       957        99
VIS    2025250    200200   16.2100  147.2200       7.7       340       971        98
VIS    2025250    200200   16.2100  147.2000       7.8       338       971        98
VIS    2025250    200200   16.2100  147.1600       8.8       340       948        99
VIS    2025250    200200   16.2100  147.1400       9.3       341       946        97
VIS    2025250    200200   16.2000  147.1100       8.8       340       953        94
VIS    2025250    200200   16.2100  147.0900       8.5       340       966        95
VIS    2025250    200200   16.1900  146.9100       6.1       338       873        98
VIS    2025250    200200   16.2000  146.8900       7.7       341       873       100
VIS    2025250    200200   16.1900  146.8500       8.7       340       925       100
VIS    2025250    200200   16.1900  146.8200       9.5       338       955        97
VIS    2025250    200200   16.1900  146.8000       9.2       338       965        91
VIS    2025250    200200   16.2000  146.7900       9.3       338       966        97
VIS    2025250    200200   16.2000  146.7700       9.3       333       966       100
VIS    2025250    200200   16.1900  146.7300       7.9       330       948        97
VIS    2025250    200200   16.1900  146.7000       7.1       326       977        92
VIS    2025250    200200   16.2000  146.6900       8.9       326       977        93
VIS    2025250    200200   16.2000  146.4500       5.0       293       831        90
VIS    2025250    200200   16.2000  146.4400       4.9       293       830        90
VIS    2025250    200200   16.1800  146.2500       9.6       313       917        96
VIS    2025250    200200   16.1800  146.2400       9.5       311       896        94
VIS    2025250    200200   16.1800  146.1300       9.1       307       966        93
VIS    2025250    200200   16.1800  146.1200       9.2       308       948        98
VIS    2025250    200200   16.1800  146.0900       7.5       299       905        92
VIS    2025250    200200   16.2000  146.0600       6.2       284       849        94
VIS    2025250    200200   16.2000  146.0400       5.6       279       820        90
VIS    2025250    200200   16.1800  145.8000       8.9       294       867        90
VIS    2025250    200200   16.2000  145.7900       8.3       290       867        91
VIS    2025250    200200   16.1800  142.1900       7.2       177       928        92
VIS    2025250    200200   16.2200  151.7200       6.4        22       997        91
VIS    2025250    200200   16.2200  151.7000       6.5        24       978        90
VIS    2025250    200200   16.2400  151.6900       6.6        32       960        94
VIS    2025250    200200   16.1800  148.8700       7.3        25       951        95
VIS    2025250    200200   16.1900  148.8400       6.9        26       940        97
VIS    2025250    200200   16.2000  148.8400       7.2        20       942        96
VIS    2025250    200200   16.1900  148.7900       8.4        23       916        97
VIS    2025250    200200   16.2000  148.7900       8.3        24       930        98
VIS    2025250    200200   16.2000  148.6900       8.1         9       864        93
VIS    2025250    200200   16.2000  148.6900       7.9        12       864        94
VIS    2025250    200200   16.2000  148.6400       7.3         5       864        93
VIS    2025250    200200   16.2000  148.6400       7.3         4       864        93
VIS    2025250    200200   16.2000  148.6100       6.3         2       908        90
VIS    2025250    200200   16.2000  148.5700       6.7         1       926        92
VIS    2025250    200200   16.2000  148.5700       6.7         2       926        91
VIS    2025250    200200   16.2000  148.5400       6.8        11       925        92
VIS    2025250    200200   16.2000  148.5000       6.8        18       904        96
VIS    2025250    200200   16.2000  148.2200       8.4         4       916        96
VIS    2025250    200200   16.1800  148.2000       8.5         5       916        95
VIS    2025250    200200   16.2000  148.1800       7.8         1       920        95
VIS    2025250    200200   16.1800  148.1500       7.7         3       923        96
VIS    2025250    200200   16.1800  148.1100       7.8       353       935        99
VIS    2025250    200200   16.1900  148.1000       7.8       351       935        99
VIS    2025250    200200   16.1800  148.0700       8.0       354       942        98
VIS    2025250    200200   16.1800  148.0300       7.7       355       944       100
VIS    2025250    200200   16.1800  148.0200       7.7       354       945       100
VIS    2025250    200200   16.1900  148.0100       7.9       354       961        99
VIS    2025250    200200   16.1900  147.7800       7.9       359       955        94
VIS    2025250    200200   16.1700  147.7700       8.1       357       951        94
VIS    2025250    200200   16.1800  147.7400       8.1         0       948        93
VIS    2025250    200200   16.1800  147.7100       7.9         1       922        91
VIS    2025250    200200   16.1800  147.7000       7.9         0       923        94
VIS    2025250    200200   16.1900  147.6800       8.1       356       930        97
VIS    2025250    200200   16.1900  147.6500       8.3       354       925        99
VIS    2025250    200200   16.1700  147.6300       8.3       354       918        98
VIS    2025250    200200   16.1800  147.5900       8.3       353       902        98
VIS    2025250    200200   16.1700  147.5700       8.0       353       891        97
VIS    2025250    200200   16.1900  147.5600       7.9       351       913        99
VIS    2025250    200200   16.1800  147.5200       7.6       348       962        99
VIS    2025250    200200   16.1900  147.4500       8.0       350       978        92
VIS    2025250    200200   16.1700  147.3700       8.2       346       975        90
VIS    2025250    200200   16.1700  147.3500       8.0       344       962        98
VIS    2025250    200200   16.1800  147.3300       8.1       344       958        99
VIS    2025250    200200   16.1900  147.2500       7.8       342       963        98
VIS    2025250    200200   16.1700  147.2200       7.9       341       971        94
VIS    2025250    200200   16.1800  147.2100       7.6       339       971        97
VIS    2025250    200200   16.1700  147.1700       7.4       338       971        96
VIS    2025250    200200   16.1700  147.1600       7.5       339       971        96
VIS    2025250    200200   16.1700  147.1400       7.6       338       973        93
VIS    2025250    200200   16.1700  147.1100       7.4       336       971        94
VIS    2025250    200200   16.1800  147.0800       8.1       338       968        96
VIS    2025250    200200   16.1700  147.0500       7.2       336       969        92
VIS    2025250    200200   16.1700  147.0500       7.3       335       969        94
VIS    2025250    200200   16.1800  146.8900       7.8       338       915        99
VIS    2025250    200200   16.1700  146.8600       8.7       338       915        98
VIS    2025250    200200   16.1700  146.8500       8.8       340       915        96
VIS    2025250    200200   16.1800  146.8100       9.6       337       955        94
VIS    2025250    200200   16.1800  146.8100       9.6       338       955        94
VIS    2025250    200200   16.1800  146.7700       9.2       336       966        93
VIS    2025250    200200   16.1700  146.7500       8.0       332       946        96
VIS    2025250    200200   16.1600  146.7000       7.9       329       961        94
VIS    2025250    200200   16.1600  146.6600       9.3       329       961        96
VIS    2025250    200200   16.1600  146.5800       9.7       321       945        93
VIS    2025250    200200   16.1600  146.4900       7.7       335       961        91
VIS    2025250    200200   16.1800  146.2500       9.6       313       917        96
VIS    2025250    200200   16.1700  146.2300       8.7       308       886        90
VIS    2025250    200200   16.1700  146.2200       8.8       308       886        91
VIS    2025250    200200   16.1700  146.1300       7.9       305       948       100
VIS    2025250    200200   16.1800  146.1300       9.0       308       964        99
VIS    2025250    200200   16.1800  146.1000       7.6       301       905        93
VIS    2025250    200200   16.1600  146.0000       4.4       274       857        95
VIS    2025250    200200   16.1800  145.9700       5.8       277       922        90
VIS    2025250    200200   16.1800  145.8400       8.0       280       896        92
VIS    2025250    200200   16.1600  145.8200       8.7       290       890        93
VIS    2025250    200200   16.1600  145.8000       8.6       290       880        92
VIS    2025250    200200   16.1700  148.9000       8.4        12       963        92
VIS    2025250    200200   16.1600  148.8600       7.5        33       951        91
VIS    2025250    200200   16.1600  148.8400       7.5        33       927        94
VIS    2025250    200200   16.1700  148.8300       7.2        30       927        92
VIS    2025250    200200   16.1800  148.7800       8.5        21       911        95
VIS    2025250    200200   16.1700  148.7700       8.8        18       908        92
VIS    2025250    200200   16.1700  148.5500       5.9         6       841        92
VIS    2025250    200200   16.1700  148.2500       8.2        10       868        95
VIS    2025250    200200   16.1700  148.2400       8.3         9       911        94
VIS    2025250    200200   16.1500  148.2100       8.6         6       912        95
VIS    2025250    200200   16.1600  148.1900       8.2         8       915        95
VIS    2025250    200200   16.1700  148.1500       7.7         4       920        97
VIS    2025250    200200   16.1700  148.1400       7.9         2       926        98
VIS    2025250    200200   16.1600  148.1100       8.1       357       932        99
VIS    2025250    200200   16.1600  148.1000       8.0       356       935        99
VIS    2025250    200200   16.1500  148.0700       8.0       355       943        99
VIS    2025250    200200   16.1600  148.0400       7.9       355       945       100
VIS    2025250    200200   16.1500  148.0200       7.7       352       945       100
VIS    2025250    200200   16.1500  148.0000       7.6       352       945        99
VIS    2025250    200200   16.1600  147.7800       7.9       356       962        91
VIS    2025250    200200   16.1700  147.7600       8.1       356       951        93
VIS    2025250    200200   16.1700  147.7300       7.9       359       927        92
VIS    2025250    200200   16.1700  147.7000       7.8       359       922        91
VIS    2025250    200200   16.1600  147.6900       7.9       356       921        95
VIS    2025250    200200   16.1600  147.6500       8.1       353       925        99
VIS    2025250    200200   16.1500  147.6300       8.1       353       929        98
VIS    2025250    200200   16.1700  147.6300       8.3       354       918        98
VIS    2025250    200200   16.1700  147.6000       8.4       355       902        97
VIS    2025250    200200   16.1600  147.5700       7.9       354       887        96
VIS    2025250    200200   16.1600  147.5500       7.5       350       887        98
VIS    2025250    200200   16.1500  147.5200       7.0       346       880        98
VIS    2025250    200200   16.1500  147.5000       7.3       347       913        99
VIS    2025250    200200   16.1500  147.4600       8.1       345       968        98
VIS    2025250    200200   16.1500  147.4400       7.7       344       971        98
VIS    2025250    200200   16.1500  147.4300       7.3       343       978        99
VIS    2025250    200200   16.1500  147.4000       7.2       341       971        98
VIS    2025250    200200   16.1600  147.3700       8.1       346       975        93
VIS    2025250    200200   16.1600  147.3400       8.1       344       964        99
VIS    2025250    200200   16.1600  147.2400       7.9       341       971        95
VIS    2025250    200200   16.1500  147.2200       7.7       340       998        95
VIS    2025250    200200   16.1500  147.2100       7.6       340       984        95
VIS    2025250    200200   16.1500  147.1700       7.6       341       971        94
VIS    2025250    200200   16.1600  147.1600       7.5       339       971        96
VIS    2025250    200200   16.1600  147.1200       7.5       335       973        97
VIS    2025250    200200   16.1600  147.1000       7.3       335       971        96
VIS    2025250    200200   16.1600  147.0900       7.4       336       971        97
VIS    2025250    200200   16.1600  147.0600       6.9       335       968        93
VIS    2025250    200200   16.1500  147.0300       7.8       333       932        91
VIS    2025250    200200   16.1500  146.9300       7.0       333       972        93
VIS    2025250    200200   16.1500  146.8800       7.8       337       915        96
VIS    2025250    200200   16.1600  146.8600       8.0       340       896        97
VIS    2025250    200200   16.1600  146.8400       8.7       340       900        95
VIS    2025250    200200   16.1400  146.8100       9.0       327       890        95
VIS    2025250    200200   16.1500  146.7800       9.2       323       939        95
VIS    2025250    200200   16.1400  146.7700       9.3       321       939        96
VIS    2025250    200200   16.1600  146.7300       7.2       329       936        98
VIS    2025250    200200   16.1500  146.7200       6.9       332       935        97
VIS    2025250    200200   16.1500  146.7000       7.4       331       960        93
VIS    2025250    200200   16.1600  146.6600       9.2       330       960        95
VIS    2025250    200200   16.1400  146.5800       8.9       325       957        92
VIS    2025250    200200   16.1400  146.5400      11.4       323       970        93
VIS    2025250    200200   16.1500  146.5400      12.0       322       970        93
VIS    2025250    200200   16.1400  146.4900       7.0       325       961        93
VIS    2025250    200200   16.1400  146.4400       7.0       313       912        97
VIS    2025250    200200   16.1400  146.4200       7.5       319       925        96
VIS    2025250    200200   16.1400  146.4100       7.7       319       925        95
VIS    2025250    200200   16.1400  146.2700      10.1       314       932        91
VIS    2025250    200200   16.1500  146.1600       8.3       304       896        91
VIS    2025250    200200   16.1400  146.1300       5.8       279       829        92
VIS    2025250    200200   16.1400  145.9900       5.4       276       831        94
VIS    2025250    200200   16.1400  145.9800       5.7       277       859        94
VIS    2025250    200200   16.1300  145.8400       8.0       286       908        94
VIS    2025250    200200   16.1400  145.8300       8.1       286       908        95
VIS    2025250    200200   16.1500  145.8000       8.5       289       880        93
VIS    2025250    200200   16.1100  142.2100       7.0       178       883        95
VIS    2025250    200200   16.1300  142.2000       6.5       179       928        90
VIS    2025250    200200   16.1400  148.8800       8.0        28       970        90
VIS    2025250    200200   16.1400  148.8600       7.9        30       958        91
VIS    2025250    200200   16.1500  148.8500       7.6        33       947        91
VIS    2025250    200200   16.1400  148.8100       7.2        17       908        92
VIS    2025250    200200   16.1300  148.8000       7.4        14       908        93
VIS    2025250    200200   16.1500  148.7700       8.4        21       906        94
VIS    2025250    200200   16.1300  148.6200       7.2        22       822        91
VIS    2025250    200200   16.1500  148.5600       6.7        11       831        93
VIS    2025250    200200   16.1300  148.2500       8.6         8       911        94
VIS    2025250    200200   16.1300  148.2300       8.8         8       911        95
VIS    2025250    200200   16.1500  148.2100       8.5         7       912        95
VIS    2025250    200200   16.1300  148.1700       7.7         5       912        98
VIS    2025250    200200   16.1300  148.1700       7.7         4       912        98
VIS    2025250    200200   16.1300  148.1300       8.3         0       915        97
VIS    2025250    200200   16.1400  148.1000       8.0       359       932        99
VIS    2025250    200200   16.1400  148.0900       8.0       358       927        99
VIS    2025250    200200   16.1300  148.0600       7.8       355       937        99
VIS    2025250    200200   16.1400  148.0400       7.9       354       945        99
VIS    2025250    200200   16.1300  148.0100       7.7       353       945       100
VIS    2025250    200200   16.1300  148.0000       7.8       353       945       100
VIS    2025250    200200   16.1300  147.9600       7.8       353       942        99
VIS    2025250    200200   16.1300  147.9300       7.8       354       942        97
VIS    2025250    200200   16.1300  147.9200       7.7       354       947        95
VIS    2025250    200200   16.1300  147.7400       7.7       359       968        92
VIS    2025250    200200   16.1400  147.7400       7.7       358       951        92
VIS    2025250    200200   16.1300  147.6900       7.9       354       913        97
VIS    2025250    200200   16.1200  147.6700       8.0       354       910        98
VIS    2025250    200200   16.1200  147.6600       7.9       354       921        98
VIS    2025250    200200   16.1200  147.6400       7.9       354       929        98
VIS    2025250    200200   16.1300  147.6000       7.9       354       929        98
VIS    2025250    200200   16.1400  147.5700       7.8       354       883        97
VIS    2025250    200200   16.1400  147.5500       7.5       350       879        97
VIS    2025250    200200   16.1400  147.5200       7.0       345       879        99
VIS    2025250    200200   16.1400  147.5200       7.0       345       879        99
VIS    2025250    200200   16.1300  147.4900       7.3       340       892        98
VIS    2025250    200200   16.1200  147.4700       7.5       341       913        99
VIS    2025250    200200   16.1200  147.4400       7.8       340       963        99
VIS    2025250    200200   16.1200  147.4000       7.7       339       930        99
VIS    2025250    200200   16.1200  147.3800       7.7       344       918        99
VIS    2025250    200200   16.1200  147.3700       7.4       350       918        99
VIS    2025250    200200   16.1400  147.3400       7.3       347       959        96
VIS    2025250    200200   16.1300  147.3000       7.9       341       965        98
VIS    2025250    200200   16.1200  147.1800       8.9       346       988        93
VIS    2025250    200200   16.1200  147.1700       9.6       347       988        90
VIS    2025250    200200   16.1300  147.1000       7.7       330       969        97
VIS    2025250    200200   16.1200  147.0700       7.9       328       971        94
VIS    2025250    200200   16.1400  147.0500       7.5       331       932        91
VIS    2025250    200200   16.1200  146.9500       9.9       329       980        91
VIS    2025250    200200   16.1300  146.9200       8.5       331       946        96
VIS    2025250    200200   16.1200  146.9100       8.5       332       946        99
VIS    2025250    200200   16.1200  146.8700       7.6       337       878        96
VIS    2025250    200200   16.1200  146.8600       7.6       336       874        95
VIS    2025250    200200   16.1200  146.8300       7.9       329       862        94
VIS    2025250    200200   16.1300  146.7500       8.2       326       928       100
VIS    2025250    200200   16.1300  146.7200       7.8       329       938        92
VIS    2025250    200200   16.1300  146.6000       9.1       326       957        90
VIS    2025250    200200   16.1100  146.5700       9.8       323       960        98
VIS    2025250    200200   16.1300  146.5400      11.3       321       970        93
VIS    2025250    200200   16.1100  146.4600       6.2       301       846        90
VIS    2025250    200200   16.1200  146.4400       6.8       307       859        94
VIS    2025250    200200   16.1100  146.4300       7.7       313       859        93
VIS    2025250    200200   16.1200  146.2700      11.0       312       963        94
VIS    2025250    200200   16.1200  146.2500      10.0       311       951        97
VIS    2025250    200200   16.1100  146.2100       8.5       301       917        99
VIS    2025250    200200   16.1200  146.1600       5.9       289       829        94
VIS    2025250    200200   16.1100  145.9400       5.2       267       761        90
VIS    2025250    200200   16.1100  145.8500       7.4       288       870        93
VIS    2025250    200200   16.1100  145.8300       7.6       290       908        95
VIS    2025250    200200   16.1200  145.8000       8.0       291       878        96
VIS    2025250    200200   16.1200  145.7900       7.9       292       876        96
VIS    2025250    200200   16.0900  142.2800       7.9       165       875        90
VIS    2025250    200200   16.0900  142.2600       7.5       175       863        91
VIS    2025250    200200   16.0900  142.2100       7.2       174       851        94
VIS    2025250    200200   16.0900  142.2100       7.3       171       851        94
VIS    2025250    200200   16.1100  148.8300       7.7        20       916        92
VIS    2025250    200200   16.1300  148.8000       7.4        12       908        93
VIS    2025250    200200   16.1200  148.7800       8.0        11       908        93
VIS    2025250    200200   16.1200  148.7500       8.5        16       903        94
VIS    2025250    200200   16.1300  148.5100       6.5         9       818        90
VIS    2025250    200200   16.1100  148.2500       9.0         4       911        94
VIS    2025250    200200   16.1000  148.2100       8.4         5       911        96
VIS    2025250    200200   16.1000  148.1800       8.1         3       910        97
VIS    2025250    200200   16.1200  148.1600       7.7         2       912        99
VIS    2025250    200200   16.1100  148.1400       7.9       359       914        98
VIS    2025250    200200   16.1000  148.1200       7.8       357       914        99
VIS    2025250    200200   16.1000  148.1100       7.9       357       914        99
VIS    2025250    200200   16.1100  148.0800       7.9       356       919        99
VIS    2025250    200200   16.1000  148.0500       7.6       357       931        99
VIS    2025250    200200   16.1100  148.0300       7.6       356       942       100
VIS    2025250    200200   16.1000  147.9900       7.6       355       942        99
VIS    2025250    200200   16.1000  147.9800       7.5       353       935        97
VIS    2025250    200200   16.1200  147.9600       7.8       353       942        99
VIS    2025250    200200   16.1200  147.9200       7.5       352       942        99
VIS    2025250    200200   16.1200  147.7500       7.9       359       971        95
VIS    2025250    200200   16.1100  147.7300       7.7       359       968        95
VIS    2025250    200200   16.1000  147.7200       7.7       358       936        96
VIS    2025250    200200   16.1100  147.6800       8.1       355       910        96
VIS    2025250    200200   16.1000  147.6600       8.0       354       921        97
VIS    2025250    200200   16.1000  147.6400       8.0       352       921        98
VIS    2025250    200200   16.1000  147.6300       8.0       351       933        99
VIS    2025250    200200   16.1100  147.5900       7.9       353       912        99
VIS    2025250    200200   16.1000  147.5800       8.0       354       910        98
VIS    2025250    200200   16.1000  147.5500       7.8       354       886        97
VIS    2025250    200200   16.1000  147.5100       7.4       347       872        98
VIS    2025250    200200   16.1000  147.4900       7.3       343       872        97
VIS    2025250    200200   16.1000  147.4700       7.3       342       873        97
VIS    2025250    200200   16.1100  147.4400       7.8       339       930        99
VIS    2025250    200200   16.1000  147.4100       7.8       335       891        96
VIS    2025250    200200   16.1000  147.4100       7.8       335       891        97
VIS    2025250    200200   16.1200  147.3700       7.6       348       908       100
VIS    2025250    200200   16.1000  147.3400       6.8       349       913        99
VIS    2025250    200200   16.1200  147.3200       7.2       342       959        99
VIS    2025250    200200   16.1000  147.2900       8.2       339       930        99
VIS    2025250    200200   16.1000  147.2800       8.2       342       931       100
VIS    2025250    200200   16.1000  147.2600       8.1       347       933       100
VIS    2025250    200200   16.1100  147.1800       9.4       347       988        90
VIS    2025250    200200   16.1000  146.9600       9.8       327       941        98
VIS    2025250    200200   16.0900  146.9500       9.6       328       941        98
VIS    2025250    200200   16.1000  146.9000       8.6       332       928        99
VIS    2025250    200200   16.1100  146.8800       7.7       339       900        96
VIS    2025250    200200   16.0900  146.8700       8.1       334       900        95
VIS    2025250    200200   16.1100  146.8400       7.7       331       864        96
VIS    2025250    200200   16.1100  146.8200       8.4       324       860        90
VIS    2025250    200200   16.0900  146.7600       8.2       327       855        90
VIS    2025250    200200   16.1000  146.7300       8.5       331       885        92
VIS    2025250    200200   16.1100  146.7300       8.8       330       938        94
VIS    2025250    200200   16.1000  146.5700       9.8       323       957        98
VIS    2025250    200200   16.1000  146.5600      10.2       322       960        98
VIS    2025250    200200   16.0900  146.5400      10.8       318       925        96
VIS    2025250    200200   16.0900  146.5100       9.7       319       912        92
VIS    2025250    200200   16.1000  146.2700      11.0       314       963        95
VIS    2025250    200200   16.1000  146.2500       9.8       311       952        96
VIS    2025250    200200   16.0900  146.2400       9.1       309       917        97
VIS    2025250    200200   16.0900  146.2000       6.9       295       839        91
VIS    2025250    200200   16.1000  145.8500       7.6       290       870        91
VIS    2025250    200200   16.1000  145.8100       8.1       292       851        90
VIS    2025250    200200   16.1000  145.8000       8.1       294       851        90
VIS    2025250    200200   16.0700  142.9700       6.7       189       917        97
VIS    2025250    200200   16.0600  142.2700       6.8       172       897        95
VIS    2025250    200200   16.0600  142.2700       6.9       172       897        95
VIS    2025250    200200   16.0800  142.2300       6.9       173       851        93
VIS    2025250    200200   16.0800  142.2000       7.3       168       851        95
VIS    2025250    200200   16.0800  142.2000       7.3       166       856        95
VIS    2025250    200200   16.1200  151.6500       6.2        49       988        96
VIS    2025250    200200   16.0900  148.8000       8.4        14       912        93
VIS    2025250    200200   16.1100  148.7800       8.1        13       908        94
VIS    2025250    200200   16.1000  148.2300       8.6         4       911        96
VIS    2025250    200200   16.1000  148.2100       8.4         4       911        96
VIS    2025250    200200   16.1000  148.2000       8.2         5       911        97
VIS    2025250    200200   16.0900  148.1700       8.0         5       910        97
VIS    2025250    200200   16.0800  148.1500       7.8         3       910        96
VIS    2025250    200200   16.1000  148.1100       7.8       357       914        99
VIS    2025250    200200   16.0800  148.0900       7.7       359       914        99
VIS    2025250    200200   16.0900  148.0600       7.7       360       918        99
VIS    2025250    200200   16.0800  148.0500       7.6       359       918        99
VIS    2025250    200200   16.0800  148.0200       7.6       356       931       100
VIS    2025250    200200   16.0800  148.0000       7.7       355       938        99
VIS    2025250    200200   16.0800  147.9800       7.2       355       941        96
VIS    2025250    200200   16.0800  147.9400       7.4       351       948        99
VIS    2025250    200200   16.0800  147.9200       7.5       351       957        99
VIS    2025250    200200   16.0800  147.8800       7.2       350       986        93
VIS    2025250    200200   16.0900  147.7300       7.7       356       971        96
VIS    2025250    200200   16.0800  147.7200       7.6       354       968        97
VIS    2025250    200200   16.0800  147.7000       7.7       355       909        99
VIS    2025250    200200   16.0800  147.6700       7.9       355       899        97
VIS    2025250    200200   16.0900  147.6400       7.9       353       921        97
VIS    2025250    200200   16.0900  147.6300       8.0       351       925        99
VIS    2025250    200200   16.0800  147.6000       8.2       353       925        96
VIS    2025250    200200   16.0900  147.5600       7.9       354       900        98
VIS    2025250    200200   16.0800  147.5500       7.9       353       899        98
VIS    2025250    200200   16.0900  147.5200       7.6       350       876        98
VIS    2025250    200200   16.0700  147.4900       7.4       348       877        99
VIS    2025250    200200   16.0800  147.4800       7.2       345       872        98
VIS    2025250    200200   16.0900  147.4600       7.3       343       873        97
VIS    2025250    200200   16.0800  147.4200       7.6       339       882        97
VIS    2025250    200200   16.0900  147.4100       7.7       336       891        97
VIS    2025250    200200   16.0700  147.3800       7.6       345       882        95
VIS    2025250    200200   16.0800  147.3400       7.1       346       887       100
VIS    2025250    200200   16.0700  147.3400       7.6       344       889        99
VIS    2025250    200200   16.0700  147.3000       7.9       343       913       100
VIS    2025250    200200   16.0900  147.2900       8.2       340       930        99
VIS    2025250    200200   16.0700  147.2700       8.0       345       913       100
VIS    2025250    200200   16.0800  147.2200       7.5       341       991        97
VIS    2025250    200200   16.0700  146.9600       9.8       325       936        95
VIS    2025250    200200   16.0900  146.9500       9.7       327       936        98
VIS    2025250    200200   16.0700  146.9100       8.9       331       928        98
VIS    2025250    200200   16.0800  146.9000       8.7       329       928        96
VIS    2025250    200200   16.0700  146.7900       8.3       328       883        95
VIS    2025250    200200   16.0700  146.7800       8.2       327       860        93
VIS    2025250    200200   16.0700  146.7400       7.0       332       871        96
VIS    2025250    200200   16.0700  146.7300       7.1       330       885        95
VIS    2025250    200200   16.0700  146.5900      10.0       324       969        98
VIS    2025250    200200   16.0800  146.5700       9.7       323       948        94
VIS    2025250    200200   16.0700  146.5500       9.9       320       925        92
VIS    2025250    200200   16.0900  146.5400      10.7       319       925        96
VIS    2025250    200200   16.0800  146.5100       9.2       319       910        92
VIS    2025250    200200   16.0800  146.4800       8.4       321       888        92
VIS    2025250    200200   16.0700  146.4500       8.3       321       890        96
VIS    2025250    200200   16.0800  146.2500       9.4       307       898        93
VIS    2025250    200200   16.0800  146.2200       8.3       301       890        98
VIS    2025250    200200   16.0500  142.9900       6.5       189       917       100
VIS    2025250    200200   16.0500  142.9800       6.5       189       917       100
VIS    2025250    200200   16.0500  142.9600       6.8       186       917        98
VIS    2025250    200200   16.0400  142.2800       5.8       178       883        96
VIS    2025250    200200   16.0400  142.2700       6.1       178       881        95
VIS    2025250    200200   16.0600  142.2100       7.2       161       841        90
VIS    2025250    200200   16.0600  142.2000       7.4       163       852        93
VIS    2025250    200200   16.1000  151.7200       6.4        64       983        93
VIS    2025250    200200   16.1100  151.6900       6.2        54       982        90
VIS    2025250    200200   16.0800  148.8600       9.8         7       933        90
VIS    2025250    200200   16.0600  148.8200       9.5        12       931        92
VIS    2025250    200200   16.0800  148.7900       8.7        14       911        93
VIS    2025250    200200   16.0600  148.7800       9.2        13       911        92
VIS    2025250    200200   16.0700  148.2400       8.4         6       911        95
VIS    2025250    200200   16.0700  148.2000       8.0         5       912        94
VIS    2025250    200200   16.0700  148.1900       8.0         6       912        94
VIS    2025250    200200   16.0800  148.1600       7.9         6       912        97
VIS    2025250    200200   16.0600  148.1300       7.7         6       910        96
VIS    2025250    200200   16.0700  148.1100       7.6         2       910        98
VIS    2025250    200200   16.0600  148.0800       7.6       360       911        93
VIS    2025250    200200   16.0600  148.0700       7.5       359       911        93
VIS    2025250    200200   16.0700  148.0300       7.7       357       918        99
VIS    2025250    200200   16.0600  148.0100       8.0       355       920        98
VIS    2025250    200200   16.0700  148.0000       7.7       355       938        99
VIS    2025250    200200   16.0700  147.9200       7.6       352       957        99
VIS    2025250    200200   16.0600  147.9000       7.5       355       963        96
VIS    2025250    200200   16.0700  147.8800       7.2       352       986        95
VIS    2025250    200200   16.0500  147.8600       7.2       351       959       100
VIS    2025250    200200   16.0700  147.8100       7.5       357       988        99
VIS    2025250    200200   16.0500  147.7900       7.2       352       957       100
VIS    2025250    200200   16.0500  147.7700       7.4       352       957       100
VIS    2025250    200200   16.0700  147.7400       7.6       350       980        95
VIS    2025250    200200   16.0600  147.7200       7.5       347       968        98
VIS    2025250    200200   16.0500  147.6900       7.5       352       963        98
VIS    2025250    200200   16.0600  147.6800       7.6       353       943        98
VIS    2025250    200200   16.0600  147.6600       7.8       353       923        98
VIS    2025250    200200   16.0500  147.6200       8.0       353       930        94
VIS    2025250    200200   16.0700  147.6100       8.2       354       925        94
VIS    2025250    200200   16.0700  147.5700       8.1       354       913        97
VIS    2025250    200200   16.0700  147.5700       8.1       353       913        98
VIS    2025250    200200   16.0500  147.5200       7.7       352       909        98
VIS    2025250    200200   16.0500  147.4700       7.6       354       910        98
VIS    2025250    200200   16.0500  147.4500       7.8       350       909        99
VIS    2025250    200200   16.0500  147.4300       7.7       348       909        99
VIS    2025250    200200   16.0500  147.4100       7.6       344       900        99
VIS    2025250    200200   16.0500  147.3900       7.6       346       892        99
VIS    2025250    200200   16.0700  147.3500       7.8       346       882        97
VIS    2025250    200200   16.0500  147.3400       8.2       348       902        98
VIS    2025250    200200   16.0700  147.3000       7.8       343       913       100
VIS    2025250    200200   16.0500  147.2500       7.8       343       923        99
VIS    2025250    200200   16.0700  147.2300       7.5       341       984        97
VIS    2025250    200200   16.0600  147.2300       7.4       341       984        96
VIS    2025250    200200   16.0500  147.2000       7.6       338       983        95
VIS    2025250    200200   16.0500  147.0400       8.4       335       994        99
VIS    2025250    200200   16.0500  147.0200       7.8       336       987        98
VIS    2025250    200200   16.0500  147.0000       8.5       332       979       100
VIS    2025250    200200   16.0600  146.9600       9.5       326       954        97
VIS    2025250    200200   16.0400  146.7800       9.2       328       915        90
VIS    2025250    200200   16.0400  146.7500       8.6       328       904        97
VIS    2025250    200200   16.0400  146.7400       8.2       328       904        97
VIS    2025250    200200   16.0600  146.5800       9.7       324       948        98
VIS    2025250    200200   16.0600  146.4600       8.8       322       890        94
VIS    2025250    200200   16.0400  146.4300       8.9       318       931        99
VIS    2025250    200200   16.0400  146.4100       9.4       317       931        97
VIS    2025250    200200   16.0300  143.0000       5.8       192       920        92
VIS    2025250    200200   16.0200  142.9900       6.0       191       920        93
VIS    2025250    200200   16.0300  142.9700       6.2       191       920        96
VIS    2025250    200200   16.0100  142.2900       5.6       175       803        92
VIS    2025250    200200   16.0200  142.2700       6.1       179       811        96
VIS    2025250    200200   16.0800  151.6400       6.4        39       977        95
VIS    2025250    200200   16.0500  148.8300       9.9        10       933        91
VIS    2025250    200200   16.0500  148.8100       9.8        12       931        91
VIS    2025250    200200   16.0400  148.7900       9.9        14       917        91
VIS    2025250    200200   16.0500  148.6900       6.9        13       825        91
VIS    2025250    200200   16.0400  148.5900       7.4        16       822        90
VIS    2025250    200200   16.0400  148.2300       8.3         6       913        96
VIS    2025250    200200   16.0400  148.2100       8.1         5       913        97
VIS    2025250    200200   16.0500  148.1700       8.1         8       912        94
VIS    2025250    200200   16.0300  148.1500       8.6         8       913        94
VIS    2025250    200200   16.0400  148.1200       7.8         6       911        97
VIS    2025250    200200   16.0500  148.1100       7.8         6       911        96
VIS    2025250    200200   16.0500  148.0700       7.6       359       911        93
VIS    2025250    200200   16.0400  148.0500       7.7       359       909        94
VIS    2025250    200200   16.0500  148.0200       8.1       358       912        97
VIS    2025250    200200   16.0500  148.0100       8.1       356       918        98
VIS    2025250    200200   16.0300  147.9900       7.8       350       920        96
VIS    2025250    200200   16.0300  147.9300       6.7       348       955        97
VIS    2025250    200200   16.0400  147.9000       7.1       353       959        98
VIS    2025250    200200   16.0300  147.8900       6.8       354       959        98
VIS    2025250    200200   16.0500  147.8000       7.1       351       961        99
VIS    2025250    200200   16.0300  147.7500       7.7       349       951       100
VIS    2025250    200200   16.0300  147.7400       7.6       351       951        98
VIS    2025250    200200   16.0300  147.7200       7.6       348       968        99
VIS    2025250    200200   16.0300  147.6800       7.7       352       968        98
VIS    2025250    200200   16.0400  147.6600       7.8       352       963        97
VIS    2025250    200200   16.0400  147.6300       7.8       352       982        95
VIS    2025250    200200   16.0500  147.6200       8.0       353       930        95
VIS    2025250    200200   16.0300  147.6000       7.9       352       960        97
VIS    2025250    200200   16.0500  147.5300       7.9       352       914        95
VIS    2025250    200200   16.0400  147.4900       7.7       355       912        95
VIS    2025250    200200   16.0400  147.4800       7.6       355       910        98
VIS    2025250    200200   16.0400  147.4300       7.7       348       909        99
VIS    2025250    200200   16.0200  147.3900       7.8       349       913        93
VIS    2025250    200200   16.0400  147.3500       8.3       350       902        97
VIS    2025250    200200   16.0200  147.3200       8.4       352       921        95
VIS    2025250    200200   16.0200  147.3100       8.3       353       921        94
VIS    2025250    200200   16.0300  147.2600       7.8       343       934        97
VIS    2025250    200200   16.0400  147.2300       7.6       341       923        96
VIS    2025250    200200   16.0300  147.2000       7.9       339       897        99
VIS    2025250    200200   16.0400  147.1900       7.7       339       983        97
VIS    2025250    200200   16.0200  147.0400       8.8       332       994        98
VIS    2025250    200200   16.0300  147.0000       8.2       337       979        97
VIS    2025250    200200   16.0400  146.9900       8.8       333       978        99
VIS    2025250    200200   16.0300  146.9700       8.8       334       974        96
VIS    2025250    200200   16.0200  146.8500       9.9       323       976        97
VIS    2025250    200200   16.0300  146.7700      10.0       327       917        92
VIS    2025250    200200   16.0400  146.7400       8.7       328       915        94
VIS    2025250    200200   16.0200  146.6500       8.0       328       957        97
VIS    2025250    200200   16.0400  146.6200      10.7       320       941        92
VIS    2025250    200200   16.0200  146.6100       7.8       322       941        92
VIS    2025250    200200   16.0300  146.4500       9.7       318       951        98
VIS    2025250    200200   16.0200  146.3400       9.9       314       942        93
VIS    2025250    200200   16.0100  142.9800       6.1       189       920        92
VIS    2025250    200200   16.0000  142.2700       6.2       178       803        93
VIS    2025250    200200   16.0100  142.2600       6.2       179       811        91
VIS    2025250    200200   16.0000  142.2000       8.0       152       879        91
VIS    2025250    200200   16.0300  148.8000      10.1        13       931        91
VIS    2025250    200200   16.0200  148.7800       9.6        13       921        92
VIS    2025250    200200   16.0200  148.7700       9.4        14       921        93
VIS    2025250    200200   16.0100  148.7300       7.7         2       906        95
VIS    2025250    200200   16.0100  148.7000       7.1         3       834        90
VIS    2025250    200200   16.0100  148.6900       6.9         9       833        93
VIS    2025250    200200   16.0300  148.6800       7.0        15       828        93
VIS    2025250    200200   16.0300  148.6000       7.3        13       822        90
VIS    2025250    200200   16.0300  148.5700       7.3        22       822        91
VIS    2025250    200200   16.0300  148.2300       8.7         5       912        95
VIS    2025250    200200   16.0100  148.1900       9.1         6       912        94
VIS    2025250    200200   16.0100  148.1900       9.3         7       913        93
VIS    2025250    200200   16.0200  148.1500       9.2         9       913        93
VIS    2025250    200200   16.0100  148.1300       8.9         4       915        95
VIS    2025250    200200   16.0100  148.1000       8.7         2       911        96
VIS    2025250    200200   16.0100  148.0900       8.5         1       911        96
VIS    2025250    200200   16.0100  148.0600       8.1         1       910        97
VIS    2025250    200200   16.0100  148.0200       8.4         2       911        97
VIS    2025250    200200   16.0100  148.0100       8.5       360       911        96
VIS    2025250    200200   16.0200  147.9900       8.2       353       916        96
VIS    2025250    200200   16.0100  147.9200       6.6       341       944        97
VIS    2025250    200200   16.0200  147.8800       6.8       355       957        98
VIS    2025250    200200   16.0200  147.8700       6.8       355       940        97
VIS    2025250    200200   16.0100  147.7800       7.5       348       957        97
VIS    2025250    200200   16.0200  147.7600       7.7       349       951        99
VIS    2025250    200200   16.0200  147.7500       7.8       351       951        99
VIS    2025250    200200   16.0200  147.7300       7.6       351       951        97
VIS    2025250    200200   16.0200  147.7000       7.6       353       962        97
VIS    2025250    200200   16.0200  147.6700       7.7       353       963        97
VIS    2025250    200200   16.0000  147.6500       7.6       353       968        94
VIS    2025250    200200   16.0200  147.6300       7.5       351       986        94
VIS    2025250    200200   16.0000  147.5900       7.7       350       965        98
VIS    2025250    200200   16.0000  147.5800       7.7       348       962        98
VIS    2025250    200200   16.0000  147.5600       7.6       345       962        98
VIS    2025250    200200   16.0000  147.4900       7.4       357       963        92
VIS    2025250    200200   16.0200  147.4700       7.6       355       958        90
VIS    2025250    200200   16.0100  147.4400       7.8       351       960        90
VIS    2025250    200200   16.0200  147.4400       7.8       349       960        92
VIS    2025250    200200   16.0200  147.4000       7.8       348       954        93
VIS    2025250    200200   16.0200  147.3200       8.4       352       921        94
VIS    2025250    200200   16.0200  147.3200       8.4       352       921        94
VIS    2025250    200200   16.0100  147.2800       8.0       345       947        93
VIS    2025250    200200   16.0200  147.2500       7.8       340       921        97
VIS    2025250    200200   16.0100  147.2400       7.8       340       901        97
VIS    2025250    200200   16.0000  147.2000       8.0       342       897        98
VIS    2025250    200200   16.0100  147.1800       8.6       344       986        95
VIS    2025250    200200   16.0100  147.1500       8.9       343       993        95
VIS    2025250    200200   16.0100  147.0200       8.9       332       994        93
VIS    2025250    200200   16.0000  146.8900       9.6       330       996        94
VIS    2025250    200200   16.0000  146.8600       9.8       323       976        98
VIS    2025250    200200   16.0000  146.8400       9.7       325       976        99
VIS    2025250    200200   16.0100  146.8200       9.7       325       970        99
VIS    2025250    200200   16.0000  146.8000       9.0       325       970        99
VIS    2025250    200200   15.9900  146.6900       9.0       325       944        94
VIS    2025250    200200   15.9900  146.6600       8.9       325       938        97
VIS    2025250    200200   16.0000  146.6300       8.7       324       938        98
VIS    2025250    200200   16.0100  146.1900      10.5       312       913        90
VIS    2025250    200200   16.0000  145.9500       9.6       302       930        96
VIS    2025250    200200   16.0000  145.8900       6.9       294       920        92
VIS    2025250    200200   16.0000  145.8700       6.9       294       920        92
VIS    2025250    200200   16.0000  145.8600       7.2       295       900        93
VIS    2025250    200200   15.9700  142.3000       6.4       179       863        93
VIS    2025250    200200   16.0400  151.7100       6.4        58       966        91
VIS    2025250    200200   16.0200  151.7000       6.8        57       960        90
VIS    2025250    200200   16.0000  148.7600       9.1        13       951        94
VIS    2025250    200200   16.0100  148.7300       7.6         3       906        96
VIS    2025250    200200   15.9900  148.7100       7.1         7       906        98
VIS    2025250    200200   15.9900  148.6900       6.9        13       884        97
VIS    2025250    200200   16.0000  148.6700       7.6        15       833        90
VIS    2025250    200200   15.9900  148.5800       7.5        28       828        91
VIS    2025250    200200   16.0000  148.4100       7.9        18       830        90
VIS    2025250    200200   16.0000  148.4000       8.0        19       830        90
VIS    2025250    200200   15.9800  148.3000       7.5         7       824        90
VIS    2025250    200200   15.9800  148.2400       8.5         2       910        96
VIS    2025250    200200   15.9900  148.2200       8.9         2       912        95
VIS    2025250    200200   15.9900  148.1900       9.2         4       913        94
VIS    2025250    200200   15.9800  148.1800       9.2         4       913        94
VIS    2025250    200200   15.9800  148.1500       8.8         4       913        96
VIS    2025250    200200   15.9900  148.1300       8.7         3       913        96
VIS    2025250    200200   16.0000  148.1000       8.6         2       911        96
VIS    2025250    200200   16.0000  148.0800       8.4         2       911        97
VIS    2025250    200200   15.9900  148.0500       8.1         5       911        97
VIS    2025250    200200   15.9800  148.0300       8.3         7       911        96
VIS    2025250    200200   16.0000  148.0100       8.5         2       911        96
VIS    2025250    200200   15.9900  147.9900       8.5       359       914        95
VIS    2025250    200200   15.9900  147.9700       7.7       354       917        90
VIS    2025250    200200   16.0000  147.9300       6.1       348       926        91
VIS    2025250    200200   15.9800  147.9000       6.8       346       929        98
VIS    2025250    200200   15.9800  147.8900       6.9       346       929        98
VIS    2025250    200200   16.0000  147.8600       6.5       356       938        96
VIS    2025250    200200   15.9800  147.7800       7.8       349       972        99
VIS    2025250    200200   15.9900  147.7600       8.0       350       963        95
VIS    2025250    200200   15.9800  147.7300       7.6       351       958        93
VIS    2025250    200200   16.0000  147.7100       7.5       352       951        97
VIS    2025250    200200   16.0000  147.6800       7.6       351       959        98
VIS    2025250    200200   16.0000  147.5900       7.6       350       965        98
VIS    2025250    200200   16.0000  147.5800       7.6       347       962        98
VIS    2025250    200200   15.9900  147.5600       7.5       347       962        97
VIS    2025250    200200   15.9800  147.5200       7.5       346       986        96
VIS    2025250    200200   15.9800  147.5100       7.4       350       986        97
VIS    2025250    200200   15.9900  147.4700       7.5       356       953        94
VIS    2025250    200200   16.0000  147.4400       7.9       354       960        93
VIS    2025250    200200   15.9900  147.4300       8.0       354       960        94
VIS    2025250    200200   15.9800  147.2900       7.6       341       972        97
VIS    2025250    200200   15.9800  147.2700       7.7       338       966        99
VIS    2025250    200200   15.9900  147.1900       8.5       343       989        93
VIS    2025250    200200   15.9900  147.1600       8.8       343       993        95
VIS    2025250    200200   15.9900  146.9200       9.1       335       995        99
VIS    2025250    200200   15.9700  146.8800       9.3       331       991       100
VIS    2025250    200200   15.9700  146.8200       9.0       325       980        99
VIS    2025250    200200   15.9800  146.8000       8.4       325       978        98
VIS    2025250    200200   15.9900  146.7000      11.6       324       960        94
VIS    2025250    200200   15.9700  146.6800      10.7       321       944        92
VIS    2025250    200200   15.9700  146.6400       8.9       323       962        95
VIS    2025250    200200   15.9800  146.6200       8.5       325       919        97
VIS    2025250    200200   15.9800  146.3400      10.0       316       948        95
VIS    2025250    200200   15.9700  146.3100       9.5       314       948        97
VIS    2025250    200200   15.9700  146.0000       8.3       298       943        96
VIS    2025250    200200   15.9700  145.9000       7.4       296       947        90
VIS    2025250    200200   15.9700  145.8700       7.3       295       920        93
VIS    2025250    200200   15.9600  145.8600       7.7       295       865        91
VIS    2025250    200200   15.9400  142.4100       7.8       160       833        92
VIS    2025250    200200   15.9400  142.4100       7.9       160       839        90
VIS    2025250    200200   15.9400  142.3400       6.1       183       867        94
VIS    2025250    200200   15.9600  142.1700       6.6       156       870        96
VIS    2025250    200200   15.9700  148.7400       7.4        13       955        96
VIS    2025250    200200   15.9800  148.7200       7.1         8       928       100
VIS    2025250    200200   15.9800  148.6900       6.7        11       905        98
VIS    2025250    200200   15.9800  148.6800       6.9        13       884        97
VIS    2025250    200200   15.9800  148.5800       7.6        18       828        91
VIS    2025250    200200   15.9600  148.4800       7.1        24       826        93
VIS    2025250    200200   15.9800  148.4500       7.8        20       824        90
VIS    2025250    200200   15.9800  148.4200       7.8        27       833        90
VIS    2025250    200200   15.9700  148.3700       7.6        29       837        91
VIS    2025250    200200   15.9700  148.3600       7.8        25       840        91
VIS    2025250    200200   15.9600  148.3500       7.9        20       840        91
VIS    2025250    200200   15.9600  148.3200       7.9        12       840        91
VIS    2025250    200200   15.9800  148.2900       7.5         6       828        90
VIS    2025250    200200   15.9700  148.2300       8.4         1       911        97
VIS    2025250    200200   15.9700  148.2200       8.5         1       912        97
VIS    2025250    200200   15.9600  148.1800       8.5         2       913        97
VIS    2025250    200200   15.9600  148.1700       8.5         2       913        97
VIS    2025250    200200   15.9700  148.1400       8.4         5       913        96
VIS    2025250    200200   15.9700  148.1100       8.1         6       912        96
VIS    2025250    200200   15.9700  148.1000       8.0         5       911        96
VIS    2025250    200200   15.9700  148.0600       8.0         5       911        97
VIS    2025250    200200   15.9700  148.0500       8.0         6       911        97
VIS    2025250    200200   15.9700  148.0300       8.2         7       911        96
VIS    2025250    200200   15.9700  148.0000       8.4         1       912        96
VIS    2025250    200200   15.9800  147.9800       8.3       355       914        96
VIS    2025250    200200   15.9600  147.9600       7.5       355       913        98
VIS    2025250    200200   15.9800  147.9200       6.7       353       918        99
VIS    2025250    200200   15.9800  147.9000       6.9       348       923        99
VIS    2025250    200200   15.9700  147.8600       6.3       348       929        92
VIS    2025250    200200   15.9600  147.8500       6.1       347       929        93
VIS    2025250    200200   15.9600  147.8200       6.5       354       948        95
VIS    2025250    200200   15.9600  147.8000       6.9       353       948        98
VIS    2025250    200200   15.9700  147.7700       7.7       349       960        97
VIS    2025250    200200   15.9700  147.7600       7.8       350       962        95
VIS    2025250    200200   15.9700  147.7300       7.5       349       962        95
VIS    2025250    200200   15.9700  147.7000       7.5       348       962        94
VIS    2025250    200200   15.9700  147.6000       7.1       349       965        90
VIS    2025250    200200   15.9700  147.5900       7.1       348       962        92
VIS    2025250    200200   15.9600  147.5500       7.5       351       975        94
VIS    2025250    200200   15.9700  147.5300       7.6       346       978        94
VIS    2025250    200200   15.9700  147.5100       7.4       348       975        97
VIS    2025250    200200   15.9500  147.4800       7.5       350       926        99
VIS    2025250    200200   15.9500  147.4700       7.5       351       925        99
VIS    2025250    200200   15.9600  147.4300       8.0       353       925        98
VIS    2025250    200200   15.9700  147.2800       7.7       337       972        98
VIS    2025250    200200   15.9700  147.2700       7.7       338       966        98
VIS    2025250    200200   15.9700  147.2300       7.8       347       906        90
VIS    2025250    200200   15.9700  147.2300       7.8       346       906        91
VIS    2025250    200200   15.9500  146.9000       8.8       332       997        98
VIS    2025250    200200   15.9600  146.8200       8.9       325       982        99
VIS    2025250    200200   15.9500  146.8000       8.6       324       982        93
VIS    2025250    200200   15.9500  146.7200      10.4       317       990        98
VIS    2025250    200200   15.9500  146.7000      10.6       319       990        97
VIS    2025250    200200   15.9700  146.6700      11.0       319       962        94
VIS    2025250    200200   15.9500  146.6500      10.1       319       967        93
VIS    2025250    200200   15.9700  146.6400       8.9       323       962        93
VIS    2025250    200200   15.9600  146.3200       9.2       313       948        94
VIS    2025250    200200   15.9600  146.3000       9.0       314       948        98
VIS    2025250    200200   15.9400  146.2700       9.6       311       938        96
VIS    2025250    200200   15.9600  146.0300       8.9       303       939        90
VIS    2025250    200200   15.9600  146.0100       8.6       301       947        95
VIS    2025250    200200   15.9500  145.8900       7.8       295       942        91
VIS    2025250    200200   15.9600  145.8700       7.9       295       879        94
VIS    2025250    200200   15.9400  142.4100       7.8       162       839        92
VIS    2025250    200200   15.9300  142.3900       7.7       162       859        91
VIS    2025250    200200   15.9300  142.3700       7.2       168       865        95
VIS    2025250    200200   15.9300  142.3400       6.2       183       866        93
VIS    2025250    200200   15.9200  142.2500       6.2       185       940        95
VIS    2025250    200200   15.9200  142.2200       5.3       170       910        98
VIS    2025250    200200   15.9400  148.7200       6.2        17       969        92
VIS    2025250    200200   15.9500  148.6900       6.0        16       928        95
VIS    2025250    200200   15.9500  148.6800       6.5        23       906        97
VIS    2025250    200200   15.9400  148.6400       7.8        23       833        90
VIS    2025250    200200   15.9400  148.4700       7.3        17       826        92
VIS    2025250    200200   15.9400  148.4500       7.5        18       830        91
VIS    2025250    200200   15.9400  148.4400       7.5        19       830        91
VIS    2025250    200200   15.9400  148.4000       7.3        24       838        94
VIS    2025250    200200   15.9400  148.3800       7.2        22       845        90
VIS    2025250    200200   15.9500  148.3200       7.8        10       840        92
VIS    2025250    200200   15.9500  148.3200       7.8         9       840        92
VIS    2025250    200200   15.9400  148.2800       7.8         8       847        92
VIS    2025250    200200   15.9600  148.2600       7.9         8       835        90
VIS    2025250    200200   15.9400  148.2400       8.1         7       885        94
VIS    2025250    200200   15.9600  148.2100       8.4         2       913        97
VIS    2025250    200200   15.9400  148.1800       8.1         3       913        96
VIS    2025250    200200   15.9500  148.1700       8.4         3       913        97
VIS    2025250    200200   15.9400  148.1500       8.0         3       915        96
VIS    2025250    200200   15.9300  148.1100       7.5       359       918        97
VIS    2025250    200200   15.9300  148.1000       7.4       358       915        99
VIS    2025250    200200   15.9400  148.0700       7.5         2       912        98
VIS    2025250    200200   15.9300  148.0400       7.4         0       912        96
VIS    2025250    200200   15.9400  148.0300       7.5         2       912        95
VIS    2025250    200200   15.9400  147.9900       7.8       358       912        97
VIS    2025250    200200   15.9400  147.9800       7.8       356       910        98
VIS    2025250    200200   15.9400  147.9500       7.5       359       911        98
VIS    2025250    200200   15.9300  147.9200       7.9         1       913        96
VIS    2025250    200200   15.9400  147.8900       7.8       353       915        98
VIS    2025250    200200   15.9400  147.8800       7.5       350       915        98
VIS    2025250    200200   15.9500  147.8500       6.1       347       923        93
VIS    2025250    200200   15.9400  147.8200       6.5       349       922        93
VIS    2025250    200200   15.9500  147.8000       7.0       349       948        98
VIS    2025250    200200   15.9300  147.7700       7.1       346       926        98
VIS    2025250    200200   15.9300  147.7600       7.1       348       938        99
VIS    2025250    200200   15.9300  147.7400       7.3       350       950        98
VIS    2025250    200200   15.9400  147.7000       7.7       349       978        97
VIS    2025250    200200   15.9300  147.6900       7.8       351       978        96
VIS    2025250    200200   15.9300  147.6600       7.8       355       981        94
VIS    2025250    200200   15.9500  147.5700       7.5       351       975        93
VIS    2025250    200200   15.9300  147.5400       7.8       354       985        94
VIS    2025250    200200   15.9300  147.5000       7.7       349       981        98
VIS    2025250    200200   15.9500  147.4900       7.7       348       951        98
VIS    2025250    200200   15.9400  147.4500       7.7       350       922       100
VIS    2025250    200200   15.9500  147.3700       8.2       344       987        92
VIS    2025250    200200   15.9300  147.3300       8.3       350       978        94
VIS    2025250    200200   15.9300  147.3200       8.4       351       978        90
VIS    2025250    200200   15.9400  147.2900       7.6       340       978        99
VIS    2025250    200200   15.9300  147.2700       7.2       341       988        96
VIS    2025250    200200   15.9300  147.2200       7.1       346       994        94
VIS    2025250    200200   15.9200  146.8600       9.2       329       997        96
VIS    2025250    200200   15.9300  146.8300       9.4       324       994        96
VIS    2025250    200200   15.9300  146.8000       9.9       323       992        94
VIS    2025250    200200   15.9200  146.7800       9.3       324       977        92
VIS    2025250    200200   15.9200  146.7700       8.9       325       966        91
VIS    2025250    200200   15.9200  146.7300       9.1       322       963       100
VIS    2025250    200200   15.9200  146.7200       9.2       321       963        99
VIS    2025250    200200   15.9200  146.6800       9.8       318       966        97
VIS    2025250    200200   15.9400  146.6800      10.7       317       979        96
VIS    2025250    200200   15.9300  146.6500       9.1       318       976        91
VIS    2025250    200200   15.9200  146.5900       7.6       328       969        92
VIS    2025250    200200   15.9200  146.4600       8.4       314       991        97
VIS    2025250    200200   15.9200  146.3000      10.3       313       942        93
VIS    2025250    200200   15.9300  146.3000      10.0       313       938        95
VIS    2025250    200200   15.9300  146.2700       9.8       312       931        96
VIS    2025250    200200   15.9200  146.2400       9.4       311       929        98
VIS    2025250    200200   15.9300  146.2200       9.3       310       951        98
VIS    2025250    200200   15.9200  146.1600       8.4       304       930        90
VIS    2025250    200200   15.9200  146.1500       8.4       302       942        91
VIS    2025250    200200   15.9200  146.1100       7.2       296       916        93
VIS    2025250    200200   15.9400  146.0400       8.0       303       918        93
VIS    2025250    200200   15.9100  142.4200       7.0       170       788        95
VIS    2025250    200200   15.9100  142.4000       7.0       169       842        93
VIS    2025250    200200   15.9000  142.3700       6.7       174       865        90
VIS    2025250    200200   15.9000  142.3700       6.7       177       865        92
VIS    2025250    200200   15.8900  142.3400       6.3       183       864        92
VIS    2025250    200200   15.9000  142.2500       6.6       182       945        96
VIS    2025250    200200   15.9100  142.2100       5.5       173       909        95
VIS    2025250    200200   15.9200  148.7300       6.4        14       941        97
VIS    2025250    200200   15.9300  148.7200       6.3        15       941        97
VIS    2025250    200200   15.9300  148.6800       6.8        23       906        98
VIS    2025250    200200   15.9300  148.6700       7.0        25       905        96
VIS    2025250    200200   15.9300  148.4200       7.6        25       837        91
VIS    2025250    200200   15.9200  148.3400       7.6         5       840        90
VIS    2025250    200200   15.9300  148.2700       7.9         8       845        92
VIS    2025250    200200   15.9200  148.2500       8.0         8       885        94
VIS    2025250    200200   15.9200  148.2300       7.9         9       914        97
VIS    2025250    200200   15.9300  148.2100       7.8         6       914        97
VIS    2025250    200200   15.9300  148.1900       7.4         3       914        97
VIS    2025250    200200   15.9300  148.1400       7.6         5       915        96
VIS    2025250    200200   15.9300  148.1400       7.6         4       915        96
VIS    2025250    200200   15.9300  148.1000       7.5       358       918        99
VIS    2025250    200200   15.9300  148.0800       7.4       358       913        99
VIS    2025250    200200   15.9200  148.0700       7.5       360       912        99
VIS    2025250    200200   15.9200  148.0400       7.5       359       912        96
VIS    2025250    200200   15.9100  148.0100       7.5         0       911        94
VIS    2025250    200200   15.9100  147.9900       7.5       358       910        97
VIS    2025250    200200   15.9100  147.9700       7.4       355       910        99
VIS    2025250    200200   15.9300  147.9400       7.5       358       910        98
VIS    2025250    200200   15.9100  147.9000       7.9       357       909        95
VIS    2025250    200200   15.9200  147.9000       8.0       357       909        96
VIS    2025250    200200   15.9200  147.8500       7.3       346       915        97
VIS    2025250    200200   15.9200  147.8500       7.2       346       915        97
VIS    2025250    200200   15.9100  147.8200       6.9       343       916        96
VIS    2025250    200200   15.9100  147.7900       6.8       341       920        96
VIS    2025250    200200   15.9300  147.7600       7.0       347       926        98
VIS    2025250    200200   15.9200  147.7400       7.2       351       921        99
VIS    2025250    200200   15.9100  147.7100       7.2       351       893       100
VIS    2025250    200200   15.9100  147.7000       7.2       351       937        98
VIS    2025250    200200   15.9100  147.6700       7.6       353       940        98
VIS    2025250    200200   15.9100  147.6500       7.9       353       943        98
VIS    2025250    200200   15.9200  147.5300       7.9       353       991        94
VIS    2025250    200200   15.9000  147.4900       7.8       348       983        99
VIS    2025250    200200   15.9000  147.4800       7.8       347       983        98
VIS    2025250    200200   15.9200  147.4500       7.7       348       926        99
VIS    2025250    200200   15.9100  147.3500       8.0       342       987       100
VIS    2025250    200200   15.9000  147.3200       7.7       343       978        99
VIS    2025250    200200   15.9000  147.3000       7.8       345       966        99
VIS    2025250    200200   15.9000  147.2500       6.5       342       988        95
VIS    2025250    200200   15.9100  147.2200       7.1       342       888        99
VIS    2025250    200200   15.9100  147.2100       7.2       342       888       100
VIS    2025250    200200   15.9000  147.1900       7.4       342       885        98
VIS    2025250    200200   15.9100  146.8600       9.1       328       997        95
VIS    2025250    200200   15.9200  146.8500       9.2       328       996        96
VIS    2025250    200200   15.9200  146.8000       9.6       322       994        97
VIS    2025250    200200   15.9000  146.7600       8.9       325       966        94
VIS    2025250    200200   15.9000  146.7600       8.8       325       963        97
VIS    2025250    200200   15.9200  146.5900       8.1       330       969        95
VIS    2025250    200200   15.9200  146.5900       8.2       329       969        96
VIS    2025250    200200   15.9100  146.4700       8.2       316       975        98
VIS    2025250    200200   15.9000  146.4000       9.9       316       963        98
VIS    2025250    200200   15.9100  146.2900      10.6       312       931        94
VIS    2025250    200200   15.9100  146.2700      10.1       312       909        94
VIS    2025250    200200   15.9100  146.2300       9.3       311       929        99
VIS    2025250    200200   15.9100  146.2300       9.2       310       929        99
VIS    2025250    200200   15.9000  146.1900       9.8       308       936        98
VIS    2025250    200200   15.9000  146.1600       8.6       305       930        97
VIS    2025250    200200   15.9000  146.1500       8.2       301       930        96
VIS    2025250    200200   15.8900  146.1300       7.9       299       916        99
VIS    2025250    200200   15.9100  146.1100       7.5       298       916        94
VIS    2025250    200200   15.8900  146.0400       8.2       307       913        97
VIS    2025250    200200   15.8900  146.0300       8.1       307       913        98
VIS    2025250    200200   15.9000  145.9400      10.1       301       947        96
VIS    2025250    200200   15.8700  143.1300       7.4       192       891        97
VIS    2025250    200200   15.8900  143.1200       7.5       197       893        90
VIS    2025250    200200   15.8700  143.0800       6.0       192       904        98
VIS    2025250    200200   15.8900  142.3600       6.8       181       865        90
VIS    2025250    200200   15.8800  142.3500       6.7       183       865        93
VIS    2025250    200200   15.9000  149.2900       6.8         3       986        95
VIS    2025250    200200   15.9100  148.7700       7.6        25       955        94
VIS    2025250    200200   15.8900  148.7400       7.3        18       915        92
VIS    2025250    200200   15.9000  148.7200       6.8        13       907        96
VIS    2025250    200200   15.9000  148.7000       7.0        12       884        92
VIS    2025250    200200   15.8900  148.6700       7.2        11       838        90
VIS    2025250    200200   15.8900  148.2300       7.7         9       914        97
VIS    2025250    200200   15.9000  148.2000       6.8        12       914        97
VIS    2025250    200200   15.8900  148.1800       6.6         4       914        96
VIS    2025250    200200   15.8900  148.1700       6.7         4       914        97
VIS    2025250    200200   15.9000  148.1300       7.0        10       912        97
VIS    2025250    200200   15.9000  148.1200       7.0        10       912        95
VIS    2025250    200200   15.9100  148.0900       7.4         1       910        96
VIS    2025250    200200   15.9100  148.0500       7.8       359       912        98
VIS    2025250    200200   15.9000  148.0300       7.9         1       910        96
VIS    2025250    200200   15.8900  148.0200       7.9         2       909        97
VIS    2025250    200200   15.8900  147.9900       7.7       359       909        98
VIS    2025250    200200   15.9000  147.9600       7.5       354       909        99
VIS    2025250    200200   15.8800  147.9300       7.0       358       907        99
VIS    2025250    200200   15.8900  147.9300       7.2       357       907        99
VIS    2025250    200200   15.8800  147.8900       7.4       355       908        97
VIS    2025250    200200   15.8800  147.8600       7.4       356       908        98
VIS    2025250    200200   15.8900  147.8400       7.1       353       911        97
VIS    2025250    200200   15.9000  147.8100       6.9       342       916        96
VIS    2025250    200200   15.9000  147.8100       6.7       343       917        96
VIS    2025250    200200   15.9000  147.7800       6.6       343       920        96
VIS    2025250    200200   15.8800  147.7500       7.1       350       887        95
VIS    2025250    200200   15.8800  147.7100       7.3       355       888        99
VIS    2025250    200200   15.9000  147.7000       7.1       352       893        99
VIS    2025250    200200   15.8800  147.6800       7.3       350       937        98
VIS    2025250    200200   15.9000  147.6600       7.7       353       940        98
VIS    2025250    200200   15.8800  147.6300       8.6       358       960        94
VIS    2025250    200200   15.9000  147.4700       8.0       348       984        95
VIS    2025250    200200   15.8800  147.4300       7.4       348       989        98
VIS    2025250    200200   15.8900  147.3300       7.7       339       978        99
VIS    2025250    200200   15.8800  147.3000       7.8       340       951        94
VIS    2025250    200200   15.8800  147.2900       7.8       342       944        96
VIS    2025250    200200   15.9000  147.2700       7.2       346       966        98
VIS    2025250    200200   15.9000  147.2400       6.9       339       966        97
VIS    2025250    200200   15.8900  147.2100       7.7       339       888        97
VIS    2025250    200200   15.8900  147.2000       7.7       341       888        96
VIS    2025250    200200   15.8800  147.1800       7.6       345       987        92
VIS    2025250    200200   15.8700  146.8200       7.4       328       999        90
VIS    2025250    200200   15.8800  146.8000       7.7       325       996        93
VIS    2025250    200200   15.8800  146.7500       8.5       326       994        94
VIS    2025250    200200   15.8900  146.6300       7.6       320       969        94
VIS    2025250    200200   15.8900  146.5500       7.3       329       974        93
VIS    2025250    200200   15.8900  146.4400       7.7       316       977        94
VIS    2025250    200200   15.8800  146.4300       8.0       319       969        93
VIS    2025250    200200   15.8700  146.3800       8.7       320       963        97
VIS    2025250    200200   15.8900  146.2600       9.3       309       929        90
VIS    2025250    200200   15.8900  146.2300       9.5       311       929        96
VIS    2025250    200200   15.8800  146.2000      10.2       310       939        97
VIS    2025250    200200   15.8700  146.1800      10.0       310       932        96
VIS    2025250    200200   15.8800  146.1400       8.3       303       928        99
VIS    2025250    200200   15.8700  146.1200       7.9       300       916        98
VIS    2025250    200200   15.8800  146.0400       8.4       305       904        92
VIS    2025250    200200   15.8600  143.1300       7.3       192       887        95
VIS    2025250    200200   15.8700  143.1300       7.2       192       887        97
VIS    2025250    200200   15.8500  143.0800       5.1       194       878        91
VIS    2025250    200200   15.8500  143.0800       5.2       193       878        91
VIS    2025250    200200   15.8600  142.6400       6.3       183       870        96
VIS    2025250    200200   15.8500  142.6100       6.7       180       870        98
VIS    2025250    200200   15.8500  142.6000       6.7       180       870        98
VIS    2025250    200200   15.8800  149.3100       6.9         3       998       100
VIS    2025250    200200   15.8700  149.2700       6.4         1       992        96
VIS    2025250    200200   15.8900  148.7600       7.1        23       929        92
VIS    2025250    200200   15.8900  148.7600       7.1        22       927        92
VIS    2025250    200200   15.8900  148.7200       7.1        12       907        95
VIS    2025250    200200   15.8900  148.7100       7.0        10       886        96
VIS    2025250    200200   15.8800  148.6800       6.2         5       842        93
VIS    2025250    200200   15.8700  148.6500       6.1         8       838        94
VIS    2025250    200200   15.8700  148.6300       6.7        13       838        96
VIS    2025250    200200   15.8800  148.5900       6.6         9       837        93
VIS    2025250    200200   15.8800  148.5700       7.0         8       833        93
VIS    2025250    200200   15.8800  148.5600       7.3         7       827        91
VIS    2025250    200200   15.8800  148.5200       7.2         7       824        90
VIS    2025250    200200   15.8800  148.5100       6.8        10       821        92
VIS    2025250    200200   15.8800  148.4800       6.2        24       818        92
VIS    2025250    200200   15.8700  148.4600       6.8        31       820        91
VIS    2025250    200200   15.8700  148.3800       6.7        20       822        93
VIS    2025250    200200   15.8700  148.3700       6.6        15       823        93
VIS    2025250    200200   15.8800  148.2300       7.7        10       915        97
VIS    2025250    200200   15.8800  148.2100       7.2        11       915        97
VIS    2025250    200200   15.8700  148.1900       7.0        10       915        97
VIS    2025250    200200   15.8600  148.1600       7.3         0       915        96
VIS    2025250    200200   15.8600  148.1400       7.4       358       915        98
VIS    2025250    200200   15.8600  148.1200       7.6       360       913        99
VIS    2025250    200200   15.8800  148.0800       8.0         3       909        97
VIS    2025250    200200   15.8800  148.0600       8.1         2       909        98
VIS    2025250    200200   15.8800  148.0500       8.1         2       909        98
VIS    2025250    200200   15.8600  148.0300       7.6         2       906        97
VIS    2025250    200200   15.8700  147.9900       7.8       359       906        98
VIS    2025250    200200   15.8600  147.9700       7.5         1       906        99
VIS    2025250    200200   15.8800  147.9400       6.9       359       907       100
VIS    2025250    200200   15.8800  147.9200       7.0       359       907        99
VIS    2025250    200200   15.8800  147.8900       7.4       355       908        98
VIS    2025250    200200   15.8800  147.8800       7.4       355       908        98
VIS    2025250    200200   15.8700  147.8400       7.3       359       911        98
VIS    2025250    200200   15.8700  147.8200       6.9       357       913        95
VIS    2025250    200200   15.8800  147.8000       6.3       352       916        91
VIS    2025250    200200   15.8800  147.7700       6.6       344       920        94
VIS    2025250    200200   15.8600  147.7500       7.5       344       920        97
VIS    2025250    200200   15.8600  147.7200       7.7       349       888        99
VIS    2025250    200200   15.8600  147.6900       7.4       348       893        99
VIS    2025250    200200   15.8600  147.6900       7.4       348       893        99
VIS    2025250    200200   15.8700  147.6500       7.7       352       893        96
VIS    2025250    200200   15.8800  147.6400       8.5       357       893        93
VIS    2025250    200200   15.8600  147.6100       8.6         1       954        94
VIS    2025250    200200   15.8600  147.5800       7.6       354       960        96
VIS    2025250    200200   15.8600  147.5700       7.2       350       992        94
VIS    2025250    200200   15.8600  147.5400       6.9       345       981        91
VIS    2025250    200200   15.8700  147.4500       7.6       348       989        98
VIS    2025250    200200   15.8700  147.4300       7.5       347       986        99
VIS    2025250    200200   15.8700  147.4200       7.4       345       986        98
VIS    2025250    200200   15.8600  147.3900       7.9       344       968       100
VIS    2025250    200200   15.8600  147.3700       7.7       341       984        97
VIS    2025250    200200   15.8600  147.3500       7.2       340       980        98
VIS    2025250    200200   15.8700  147.3100       7.6       339       960        94
VIS    2025250    200200   15.8700  147.3000       7.7       340       960        93
VIS    2025250    200200   15.8600  147.2700       7.1       348       938        95
VIS    2025250    200200   15.8700  147.2500       6.8       348       938        94
VIS    2025250    200200   15.8500  146.7300       9.1       327       994        90
VIS    2025250    200200   15.8500  146.6200      11.0       316       974        93
VIS    2025250    200200   15.8600  146.5900       8.1       324       966        98
VIS    2025250    200200   15.8600  146.5800       8.1       325       974        98
VIS    2025250    200200   15.8700  146.5600       7.0       332       965        92
VIS    2025250    200200   15.8600  146.5100       8.5       314       965        98
VIS    2025250    200200   15.8600  146.4200       8.1       317       977        98
VIS    2025250    200200   15.8500  146.3900       9.2       316       963        94
VIS    2025250    200200   15.8500  146.3800       9.1       315       963        95
VIS    2025250    200200   15.8700  146.2000      10.8       312       939        94
VIS    2025250    200200   15.8600  146.1900      10.5       311       939        94
VIS    2025250    200200   15.8600  146.1600       9.5       311       933        95
VIS    2025250    200200   15.8500  146.1300       8.1       300       928        95
VIS    2025250    200200   15.8500  146.1200       7.9       299       928        94
VIS    2025250    200200   15.8500  143.1300       7.3       194       894        90
VIS    2025250    200200   15.8300  143.0900       5.2       195       878        91
VIS    2025250    200200   15.8400  142.6600       6.5       187       871        92
VIS    2025250    200200   15.8400  142.6200       7.2       181       897        96
VIS    2025250    200200   15.8300  142.5900       6.6       179       886        97
VIS    2025250    200200   15.8400  142.1800       6.5       174       949        96
VIS    2025250    200200   15.8600  149.2800       6.5         1       998        97
VIS    2025250    200200   15.8600  149.2600       6.6         1       997        98
VIS    2025250    200200   15.8500  148.7100       6.3         2       935        95
VIS    2025250    200200   15.8500  148.7000       5.9         0       924        95
VIS    2025250    200200   15.8600  148.6600       5.2         4       843        91
VIS    2025250    200200   15.8500  148.6100       6.0        15       851        95
VIS    2025250    200200   15.8500  148.6000       6.2        15       843        96
VIS    2025250    200200   15.8500  148.5900       6.3        15       842        95
VIS    2025250    200200   15.8500  148.5400       7.1         9       828        92
VIS    2025250    200200   15.8500  148.5300       7.2         6       828        91
VIS    2025250    200200   15.8500  148.5100       6.8         9       827        90
VIS    2025250    200200   15.8500  148.3600       6.9         8       823        92
VIS    2025250    200200   15.8400  148.2800       6.8         6       826        92
VIS    2025250    200200   15.8500  148.2500       8.0         6       834        92
VIS    2025250    200200   15.8500  148.2500       7.8         6       915        97
VIS    2025250    200200   15.8600  148.2000       7.3         5       916        98
VIS    2025250    200200   15.8500  148.1800       7.3         2       917        98
VIS    2025250    200200   15.8500  148.1500       7.6       357       918        99
VIS    2025250    200200   15.8600  148.1400       7.6       357       915        99
VIS    2025250    200200   15.8500  148.1000       7.8       359       912        98
VIS    2025250    200200   15.8400  148.1000       7.8         1       915        98
VIS    2025250    200200   15.8500  148.0600       7.7         2       909        98
VIS    2025250    200200   15.8400  148.0500       7.4         1       908        99
VIS    2025250    200200   15.8500  148.0200       7.3         2       906        97
VIS    2025250    200200   15.8400  147.9900       7.3         0       905        98
VIS    2025250    200200   15.8400  147.9700       7.3         2       906        98
VIS    2025250    200200   15.8400  147.9300       6.6       356       907        99
VIS    2025250    200200   15.8400  147.9200       6.8       353       909        99
VIS    2025250    200200   15.8500  147.8900       7.5       354       912        97
VIS    2025250    200200   15.8500  147.8800       7.5       354       912        97
VIS    2025250    200200   15.8500  147.8400       7.5       353       916        96
VIS    2025250    200200   15.8500  147.8300       7.5       353       916        95
VIS    2025250    200200   15.8500  147.7900       7.2       350       920        96
VIS    2025250    200200   15.8300  147.7600       7.1       345       924        98
VIS    2025250    200200   15.8300  147.7500       7.3       343       923        97
VIS    2025250    200200   15.8400  147.7300       7.7       344       888        98
VIS    2025250    200200   15.8500  147.6900       7.5       349       893        99
VIS    2025250    200200   15.8500  147.6900       7.5       349       893        99
VIS    2025250    200200   15.8400  147.6600       7.4       352       889        98
VIS    2025250    200200   15.8300  147.6300       8.0       355       886        97
VIS    2025250    200200   15.8400  147.5900       8.2       355       954        97
VIS    2025250    200200   15.8400  147.5900       8.0       353       954        98
VIS    2025250    200200   15.8300  147.5600       7.1       346       955        97
VIS    2025250    200200   15.8300  147.5400       6.8       347       955        96
VIS    2025250    200200   15.8300  147.5200       6.9       346       974        97
VIS    2025250    200200   15.8300  147.4900       7.2       339       974        98
VIS    2025250    200200   15.8300  147.4500       8.0       345       978        99
VIS    2025250    200200   15.8300  147.4300       7.8       347       962        99
VIS    2025250    200200   15.8300  147.4100       7.9       347       959        99
VIS    2025250    200200   15.8300  147.3700       7.7       345       968        94
VIS    2025250    200200   15.8300  147.3300       6.6       339       965        97
VIS    2025250    200200   15.8300  147.3100       7.0       339       950        98
VIS    2025250    200200   15.8300  147.2800       6.8       346       930        97
VIS    2025250    200200   15.8400  147.2600       6.9       349       930        95
VIS    2025250    200200   15.8500  147.2500       6.8       349       931        96
VIS    2025250    200200   15.8300  147.2000       7.7       336       995        93
VIS    2025250    200200   15.8300  146.6200       9.4       319       989        93
VIS    2025250    200200   15.8400  146.5200       7.7       317       965        93
VIS    2025250    200200   15.8200  146.4900       8.6       310       942        91
VIS    2025250    200200   15.8400  146.4200       9.0       313       975       100
VIS    2025250    200200   15.8300  146.3800       9.9       310       956        96
VIS    2025250    200200   15.8200  146.3800      10.1       309       956        96
VIS    2025250    200200   15.8300  146.3000       9.4       315       977        99
VIS    2025250    200200   15.8000  143.1200       6.6       195       892        96
VIS    2025250    200200   15.8100  143.1100       6.4       196       892        95
VIS    2025250    200200   15.8000  142.6200       7.2       181       871        96
VIS    2025250    200200   15.8100  142.6000       6.6       180       913        98
VIS    2025250    200200   15.8100  142.5900       6.4       180       926        98
VIS    2025250    200200   15.8300  149.2800       6.5         4       998        95
VIS    2025250    200200   15.8200  149.2100       7.5         1       991        95
VIS    2025250    200200   15.8300  148.7400       6.5         8       962        90
VIS    2025250    200200   15.8400  148.6800       5.3       358       935        90
VIS    2025250    200200   15.8200  148.5800       6.5        16       898        91
VIS    2025250    200200   15.8300  148.5600       6.4        16       843        95
VIS    2025250    200200   15.8200  148.5200       7.1        11       833        90
VIS    2025250    200200   15.8200  148.4100       7.8        16       826        90
VIS    2025250    200200   15.8300  148.3700       7.2         6       826        90
VIS    2025250    200200   15.8300  148.3700       7.2         7       826        90
VIS    2025250    200200   15.8200  148.3300       6.8        23       824        92
VIS    2025250    200200   15.8200  148.3200       6.5        24       824        93
VIS    2025250    200200   15.8300  148.3000       6.1         6       824        94
VIS    2025250    200200   15.8300  148.2600       6.8         7       826        92
VIS    2025250    200200   15.8300  148.2500       7.2         9       830        94
VIS    2025250    200200   15.8300  148.2100       7.7         3       917        98
VIS    2025250    200200   15.8200  148.1900       7.8       359       917        98
VIS    2025250    200200   15.8100  148.1600       7.8         2       921        99
VIS    2025250    200200   15.8100  148.1500       7.8         2       922        98
VIS    2025250    200200   15.8300  148.1300       7.9         0       924        97
VIS    2025250    200200   15.8300  148.0900       7.8         1       915        98
VIS    2025250    200200   15.8200  148.0600       7.3       360       910        97
VIS    2025250    200200   15.8200  148.0500       7.3       360       909        97
VIS    2025250    200200   15.8200  148.0200       7.0       360       908        97
VIS    2025250    200200   15.8100  148.0000       6.9       360       908        97
VIS    2025250    200200   15.8300  147.9700       7.2         3       906        99
VIS    2025250    200200   15.8200  147.9400       6.9       354       907        98
VIS    2025250    200200   15.8300  147.9200       7.1       349       911        98
VIS    2025250    200200   15.8100  147.8900       7.4       352       912        97
VIS    2025250    200200   15.8200  147.8700       7.3       351       917        97
VIS    2025250    200200   15.8300  147.8600       7.3       350       917        98
VIS    2025250    200200   15.8300  147.8400       7.5       347       919        96
VIS    2025250    200200   15.8200  147.7900       7.2       351       923        99
VIS    2025250    200200   15.8100  147.7800       7.1       351       926        97
VIS    2025250    200200   15.8200  147.7500       7.3       349       924        95
VIS    2025250    200200   15.8100  147.7400       7.7       350       893        92
VIS    2025250    200200   15.8100  147.7000       7.5         2       888        94
VIS    2025250    200200   15.8100  147.6800       7.4         5       888        94
VIS    2025250    200200   15.8200  147.6500       7.5       358       886        96
VIS    2025250    200200   15.8200  147.6400       7.6       357       886        97
VIS    2025250    200200   15.8100  147.6000       7.7       354       886        93
VIS    2025250    200200   15.8100  147.5800       7.3       351       884        95
VIS    2025250    200200   15.8200  147.5500       7.0       347       930        99
VIS    2025250    200200   15.8300  147.5300       6.8       348       947        96
VIS    2025250    200200   15.8300  147.5200       6.9       348       974        96
VIS    2025250    200200   15.8200  147.4900       7.2       342       966        99
VIS    2025250    200200   15.8100  147.4500       7.6       342       962        99
VIS    2025250    200200   15.8100  147.4400       7.5       344       962        99
VIS    2025250    200200   15.8100  147.4100       7.6       347       959        95
VIS    2025250    200200   15.8200  147.3400       6.4       339       961        97
VIS    2025250    200200   15.8200  147.3200       6.8       340       950        98
VIS    2025250    200200   15.8100  147.3000       7.0       342       930        97
VIS    2025250    200200   15.8300  147.2700       6.6       347       916        97
VIS    2025250    200200   15.8200  147.2400       6.8       346       902        97
VIS    2025250    200200   15.8100  147.2100       7.3       339       868        96
VIS    2025250    200200   15.8200  147.1900       7.7       334       989        95
VIS    2025250    200200   15.8100  147.1600       7.1       334       982        97
VIS    2025250    200200   15.8100  147.1400       6.1       335       995        92
VIS    2025250    200200   15.8100  147.1300       6.1       335       995        95
VIS    2025250    200200   15.8000  147.0700       6.7       338       981        96
VIS    2025250    200200   15.8000  147.0600       7.1       338       981        97
VIS    2025250    200200   15.8200  147.0400       7.5       345       979        95
VIS    2025250    200200   15.8000  147.0000       7.4       337       981        95
VIS    2025250    200200   15.8000  146.5600       8.4       320       967        91
VIS    2025250    200200   15.8100  146.5000       8.7       314       941        97
VIS    2025250    200200   15.8000  146.4900       9.2       312       941        98
VIS    2025250    200200   15.8000  146.4500       8.8       311       954        97
VIS    2025250    200200   15.8000  146.4200       8.8       310       989        97
VIS    2025250    200200   15.8200  146.4000      10.0       311       975        98
VIS    2025250    200200   15.8200  146.3900      10.0       311       975        98
VIS    2025250    200200   15.8000  146.3500       8.9       306       961        94
VIS    2025250    200200   15.8000  146.3300       8.6       303       964        90
VIS    2025250    200200   15.8000  143.1200       6.5       195       892        95
VIS    2025250    200200   15.7800  142.6400       7.1       182       835        96
VIS    2025250    200200   15.7700  142.3400       6.3       187       940        96
VIS    2025250    200200   15.7800  142.3400       6.1       186       940        98
VIS    2025250    200200   15.7700  142.1900       4.0       171       872        93
VIS    2025250    200200   15.7700  142.1900       4.8       171       877        94
VIS    2025250    200200   15.8100  149.2500       7.6         4       995        97
VIS    2025250    200200   15.8000  149.2400       7.6         4       992        98
VIS    2025250    200200   15.8200  149.2000       7.0         6       991        97
VIS    2025250    200200   15.8200  149.2000       6.8         8       991        97
VIS    2025250    200200   15.8100  148.5500       6.9        12       908        93
VIS    2025250    200200   15.8000  148.5300       7.2        10       846        92
VIS    2025250    200200   15.8100  148.4300       7.9        22       827        90
VIS    2025250    200200   15.8000  148.4100       7.3        18       828        91
VIS    2025250    200200   15.8100  148.3800       7.1         9       827        91
VIS    2025250    200200   15.8100  148.3800       7.1         9       827        91
VIS    2025250    200200   15.7900  148.3400       6.9        20       827        93
VIS    2025250    200200   15.7900  148.3300       6.7        20       826        94
VIS    2025250    200200   15.8100  148.2900       6.2         6       825        92
VIS    2025250    200200   15.8100  148.2800       6.2         7       825        92
VIS    2025250    200200   15.7900  148.2500       7.2        15       916        98
VIS    2025250    200200   15.8100  148.2200       7.8         8       918        97
VIS    2025250    200200   15.8100  148.2000       8.3         2       917        97
VIS    2025250    200200   15.8100  148.1800       8.2         0       917        98
VIS    2025250    200200   15.8100  148.1400       7.8         5       924        98
VIS    2025250    200200   15.7900  148.1200       7.6        15       924        94
VIS    2025250    200200   15.7900  148.1100       7.6        13       924        95
VIS    2025250    200200   15.7900  148.0900       7.5         8       919        97
VIS    2025250    200200   15.8000  148.0400       7.5         4       911        98
VIS    2025250    200200   15.7900  148.0400       7.6         4       911        98
VIS    2025250    200200   15.7900  148.0100       7.2         1       909        99
VIS    2025250    200200   15.7900  147.9700       6.4         9       909        98
VIS    2025250    200200   15.7900  147.9400       6.6         4       909        99
VIS    2025250    200200   15.8000  147.9300       6.9       359       909        97
VIS    2025250    200200   15.7900  147.9200       7.1       353       912        96
VIS    2025250    200200   15.8000  147.8800       7.2       351       914        97
VIS    2025250    200200   15.8000  147.8600       7.1       350       917        97
VIS    2025250    200200   15.7900  147.8400       6.6       355       919        96
VIS    2025250    200200   15.7900  147.8000       6.9         1       924        96
VIS    2025250    200200   15.8100  147.7800       7.1       353       926        98
VIS    2025250    200200   15.7900  147.7600       7.6       351       932        93
VIS    2025250    200200   15.7900  147.7400       8.0       353       893        90
VIS    2025250    200200   15.8000  147.7100       7.7       360       889        92
VIS    2025250    200200   15.8000  147.6800       7.4         4       888        93
VIS    2025250    200200   15.8000  147.6600       7.3         4       888        94
VIS    2025250    200200   15.8000  147.6500       7.3         2       887        95
VIS    2025250    200200   15.8000  147.6100       7.6       355       886        94
VIS    2025250    200200   15.7900  147.5900       7.6       354       884        96
VIS    2025250    200200   15.8000  147.5600       7.1       351       883        98
VIS    2025250    200200   15.8000  147.5500       7.2       350       882        98
VIS    2025250    200200   15.7900  147.5300       7.7       350       882        97
VIS    2025250    200200   15.7800  147.4900       8.1       351       883        96
VIS    2025250    200200   15.7800  147.4600       7.4       344       944        99
VIS    2025250    200200   15.7800  147.4600       7.3       343       953        99
VIS    2025250    200200   15.8000  147.4100       7.5       346       959        96
VIS    2025250    200200   15.7800  147.3400       7.2       342       968        98
VIS    2025250    200200   15.7900  147.3300       7.4       345       967        99
VIS    2025250    200200   15.7900  147.3000       7.4       346       913        97
VIS    2025250    200200   15.7900  147.2900       7.3       343       913        97
VIS    2025250    200200   15.7900  147.2400       6.6       345       898        98
VIS    2025250    200200   15.7800  147.2300       6.8       348       857        98
VIS    2025250    200200   15.7800  147.2000       7.2       341       855        95
VIS    2025250    200200   15.7900  147.1800       6.9       335       855        93
VIS    2025250    200200   15.8000  147.1500       6.0       335       867        98
VIS    2025250    200200   15.8000  147.1300       6.0       335       993        94
VIS    2025250    200200   15.8000  147.1000       6.4       335       993        95
VIS    2025250    200200   15.7900  147.0800       7.0       334       976        97
VIS    2025250    200200   15.7800  147.0500       7.2       331       892        96
VIS    2025250    200200   15.7800  147.0300       7.7       332       896        95
VIS    2025250    200200   15.7800  147.0100       7.6       338       980        90
VIS    2025250    200200   15.8000  146.9900       7.5       337       988        95
VIS    2025250    200200   15.7800  146.9400       7.3       346       966        95
VIS    2025250    200200   15.7800  146.5600       9.7       315       954        97
VIS    2025250    200200   15.7800  146.5400       9.6       317       954        99
VIS    2025250    200200   15.7800  146.5000       9.5       316       935        97
VIS    2025250    200200   15.7800  146.4900       9.9       313       935        97
VIS    2025250    200200   15.7800  146.4700       9.8       316       945        98
VIS    2025250    200200   15.7800  146.4400       9.4       317       973        99
VIS    2025250    200200   15.7900  146.4100       8.9       312       989        98
VIS    2025250    200200   15.7900  146.4000       9.0       309       989        91
VIS    2025250    200200   15.7900  146.3600       8.9       304       959        92
VIS    2025250    200200   15.7900  146.3000       8.1       304       967        90
VIS    2025250    200200   15.7700  146.2800       8.3       307       969        92
VIS    2025250    200200   15.7600  142.3800       7.5       181       970        92
VIS    2025250    200200   15.7500  142.3600       6.9       183       956        94
VIS    2025250    200200   15.7500  142.2400       5.9       187       918        93
VIS    2025250    200200   15.7500  142.2100       5.6       183       872        92
VIS    2025250    200200   15.7600  142.1900       4.8       179       872        91
VIS    2025250    200200   15.7800  149.9300       7.6        22       993        96
VIS    2025250    200200   15.7800  149.9100       7.7        21       993        98
VIS    2025250    200200   15.7800  149.8700       7.7        30       973        93
VIS    2025250    200200   15.7900  149.2700       7.6         5       995        94
VIS    2025250    200200   15.8000  149.2400       7.6         5       995        98
VIS    2025250    200200   15.7800  149.2000       6.7         3       987        97
VIS    2025250    200200   15.7900  149.1900       6.6         5       969        99
VIS    2025250    200200   15.7700  148.6100       7.0         5       995        90
VIS    2025250    200200   15.7700  148.5900       7.4         4       995        94
VIS    2025250    200200   15.7800  148.5300       7.0        13       908        91
VIS    2025250    200200   15.7800  148.4200       7.4        18       842        92
VIS    2025250    200200   15.7800  148.3500       6.9        21       831        92
VIS    2025250    200200   15.7800  148.3200       6.7        19       826        93
VIS    2025250    200200   15.7800  148.2900       6.8        17       825        90
VIS    2025250    200200   15.7900  148.2900       6.8        14       826        90
VIS    2025250    200200   15.7700  148.2400       7.3        22       916        92
VIS    2025250    200200   15.7700  148.2200       7.5        16       937        91
VIS    2025250    200200   15.7800  148.1200       7.0        14       926        90
VIS    2025250    200200   15.7700  148.0700       7.4         3       919        93
VIS    2025250    200200   15.7700  148.0700       7.4         3       919        94
VIS    2025250    200200   15.7700  148.0300       7.6         4       912        98
VIS    2025250    200200   15.7800  148.0000       7.1         5       909        99
VIS    2025250    200200   15.7800  148.0000       7.1         7       909        99
VIS    2025250    200200   15.7800  147.9600       6.3        12       909        97
VIS    2025250    200200   15.7800  147.9400       6.5         5       909        98
VIS    2025250    200200   15.7800  147.9200       7.0       355       912        97
VIS    2025250    200200   15.7800  147.8800       6.8       353       913        94
VIS    2025250    200200   15.7700  147.8800       6.6       356       913        93
VIS    2025250    200200   15.7800  147.8400       6.5       356       919        95
VIS    2025250    200200   15.7800  147.8200       6.6         1       919        97
VIS    2025250    200200   15.7700  147.7800       7.7       353       927        96
VIS    2025250    200200   15.7600  147.7700       7.8       348       928        95
VIS    2025250    200200   15.7700  147.7400       8.0       351       890        90
VIS    2025250    200200   15.7700  147.7300       7.8       352       889        95
VIS    2025250    200200   15.7600  147.7100       7.2       358       888        96
VIS    2025250    200200   15.7700  147.6800       7.3       358       887        95
VIS    2025250    200200   15.7700  147.6400       7.4       352       887        98
VIS    2025250    200200   15.7600  147.6200       7.4       349       888        99
VIS    2025250    200200   15.7600  147.6000       7.3       353       886        98
VIS    2025250    200200   15.7600  147.5700       7.1       350       886        99
VIS    2025250    200200   15.7600  147.5400       7.7       347       887        99
VIS    2025250    200200   15.7700  147.5400       7.9       348       882        97
VIS    2025250    200200   15.7600  147.5100       8.5       353       883        94
VIS    2025250    200200   15.7700  147.4700       7.7       350       915        99
VIS    2025250    200200   15.7700  147.4500       7.4       343       962        99
VIS    2025250    200200   15.7700  147.4300       7.2       344       967        97
VIS    2025250    200200   15.7800  147.4200       7.2       343       968        96
VIS    2025250    200200   15.7700  147.3800       7.5       341       981        94
VIS    2025250    200200   15.7600  147.3600       7.3       339       990        99
VIS    2025250    200200   15.7600  147.3200       7.6       343       922        99
VIS    2025250    200200   15.7700  147.3000       8.0       345       923        97
VIS    2025250    200200   15.7800  147.3000       7.8       346       913        96
VIS    2025250    200200   15.7600  147.2500       7.5       342       898        98
VIS    2025250    200200   15.7700  147.2400       6.9       346       857        99
VIS    2025250    200200   15.7700  147.2200       7.2       346       853        97
VIS    2025250    200200   15.7600  147.1800       6.9       343       855        92
VIS    2025250    200200   15.7600  147.1600       6.4       344       859        91
VIS    2025250    200200   15.7700  147.1100       7.1       334       880        98
VIS    2025250    200200   15.7700  147.0800       7.6       332       874        98
VIS    2025250    200200   15.7700  147.0800       7.3       332       873        98
VIS    2025250    200200   15.7700  147.0500       7.2       330       883        93
VIS    2025250    200200   15.7600  146.9600       7.2       345       966        96
VIS    2025250    200200   15.7600  146.5900      10.3       313       959        96
VIS    2025250    200200   15.7600  146.5800       9.6       314       954        98
VIS    2025250    200200   15.7500  146.5400       9.7       314       947        96
VIS    2025250    200200   15.7500  146.5400       9.7       313       935        97
VIS    2025250    200200   15.7500  146.5100       9.5       313       935        97
VIS    2025250    200200   15.7700  146.4400       9.2       317       973        99
VIS    2025250    200200   15.7500  146.2900       8.6       306       965        94
VIS    2025250    200200   15.7500  142.3900       7.5       180       970        92
VIS    2025250    200200   15.7400  142.3600       6.8       183       956        94
VIS    2025250    200200   15.7400  142.3600       6.7       184       956        94
VIS    2025250    200200   15.7400  142.3000       6.7       186       904        91
VIS    2025250    200200   15.7300  142.2400       6.3       187       905        91
VIS    2025250    200200   15.7300  142.2300       6.4       185       888        93
VIS    2025250    200200   15.7600  150.0700       7.3        28       971        95
VIS    2025250    200200   15.7600  150.0600       7.0        28       971        98
VIS    2025250    200200   15.7700  149.9200       7.8        22       993        93
VIS    2025250    200200   15.7600  149.8900       7.9        17       993        95
VIS    2025250    200200   15.7800  149.8700       7.6        27       972        92
VIS    2025250    200200   15.7700  149.8600       7.7        28       972        90
VIS    2025250    200200   15.7700  149.2000       6.7         3       987        97
VIS    2025250    200200   15.7700  148.5900       7.4         3       993        96
VIS    2025250    200200   15.7500  148.5700       7.3       358       983        99
VIS    2025250    200200   15.7600  148.5400       6.9        10       967        92
VIS    2025250    200200   15.7600  148.5200       7.2        14       930        95
VIS    2025250    200200   15.7500  148.5000       7.3        13       919        93
VIS    2025250    200200   15.7500  148.4400       8.9        14       901        92
VIS    2025250    200200   15.7400  148.4300       9.2        11       927        95
VIS    2025250    200200   15.7600  148.3200       6.7        19       831        92
VIS    2025250    200200   15.7600  148.3100       6.8        20       831        91
VIS    2025250    200200   15.7400  148.2800       8.3        28       847        90
VIS    2025250    200200   15.7600  148.2600       7.9        25       832        90
VIS    2025250    200200   15.7600  148.0500       7.6         2       915        95
VIS    2025250    200200   15.7600  148.0400       7.8       360       916        95
VIS    2025250    200200   15.7500  148.0000       8.0         6       912        94
VIS    2025250    200200   15.7500  147.9800       8.1        12       911        95
VIS    2025250    200200   15.7500  147.9700       8.0        13       911        95
VIS    2025250    200200   15.7600  147.9300       7.1         6       912        94
VIS    2025250    200200   15.7500  147.8200       6.6       359       918        95
VIS    2025250    200200   15.7600  147.7800       7.7       352       927        96
VIS    2025250    200200   15.7500  147.7700       7.6       350       926        94
VIS    2025250    200200   15.7500  147.7400       7.1       351       913        95
VIS    2025250    200200   15.7600  147.7200       7.3       354       888        96
VIS    2025250    200200   15.7400  147.6900       7.0       353       919        92
VIS    2025250    200200   15.7400  147.6800       7.1       350       921        94
VIS    2025250    200200   15.7400  147.6400       7.4       350       920        95
VIS    2025250    200200   15.7400  147.6100       7.1       357       920        91
VIS    2025250    200200   15.7400  147.5500       7.0       350       917        93
VIS    2025250    200200   15.7600  147.5400       7.9       347       888        92
VIS    2025250    200200   15.7400  147.4900       7.9       349       915        91
VIS    2025250    200200   15.7500  147.4400       7.7       348       944        96
VIS    2025250    200200   15.7500  147.4100       7.7       347       958        91
VIS    2025250    200200   15.7500  147.3700       7.0       343       928        94
VIS    2025250    200200   15.7500  147.3600       6.8       342       922        96
VIS    2025250    200200   15.7500  147.3200       7.3       343       922        99
VIS    2025250    200200   15.7500  147.3200       7.5       344       917        99
VIS    2025250    200200   15.7400  147.2800       7.7       345       916        93
VIS    2025250    200200   15.7500  147.2600       7.6       342       898        93
VIS    2025250    200200   15.7500  147.2500       7.4       342       896        92
VIS    2025250    200200   15.7500  147.2200       7.3       343       852        93
VIS    2025250    200200   15.7400  147.2000       6.9       347       849        90
VIS    2025250    200200   15.7500  147.0800       8.2       327       875        91
VIS    2025250    200200   15.7500  147.0600       7.1       332       877        95
VIS    2025250    200200   15.7500  147.0500       7.1       332       877        95
VIS    2025250    200200   15.7400  147.0100       7.6       336       887        91
VIS    2025250    200200   15.7300  146.8000       7.2       324       912        90
VIS    2025250    200200   15.7300  146.6200       9.8       321       960        94
VIS    2025250    200200   15.7300  146.6000       7.6       324       947        94
VIS    2025250    200200   15.7500  146.5900       9.6       316       954        98
VIS    2025250    200200   15.7300  146.5500       8.9       316       935        94
VIS    2025250    200200   15.7300  146.5400       8.8       316       932        91
VIS    2025250    200200   15.7300  146.5200       9.0       315       921        91
VIS    2025250    200200   15.7400  146.3000       8.6       305       965        90
VIS    2025250    200200   15.7200  143.5000       5.0        90       181        95
VIS    2025250    200200   15.7000  142.4600       6.5       182       978        95
VIS    2025250    200200   15.7000  142.4300       6.6       182       978        94
VIS    2025250    200200   15.7400  150.0800       7.7        28       964        90
VIS    2025250    200200   15.7500  149.9300       7.5        16       995        91
VIS    2025250    200200   15.7400  149.9000       7.5        11       993        96
VIS    2025250    200200   15.7500  149.8800       7.3        14       972        95
VIS    2025250    200200   15.7400  149.8500       7.0        12       969        96
VIS    2025250    200200   15.7300  149.8300       7.5         8       967        95
VIS    2025250    200200   15.7400  148.5800       7.2         1       978        98
VIS    2025250    200200   15.7300  148.5500       7.3         6       969        96
VIS    2025250    200200   15.7300  148.5500       7.2         6       969        96
VIS    2025250    200200   15.7400  148.5000       7.2        10       919        95
VIS    2025250    200200   15.7200  148.5000       7.7        11       916        94
VIS    2025250    200200   15.7200  148.4600       7.6        15       906        98
VIS    2025250    200200   15.7400  148.4300       9.0        12       910        94
VIS    2025250    200200   15.7300  148.4100       8.7        12       945        93
VIS    2025250    200200   15.7300  148.4000       8.8        12       937        94
VIS    2025250    200200   15.7200  148.3800       8.8        18       957        90
VIS    2025250    200200   15.7200  148.3300       7.3        18       934        96
VIS    2025250    200200   15.7200  148.3200       7.0        18       908        97
VIS    2025250    200200   15.7200  148.2900       8.0        25       909        97
VIS    2025250    200200   15.7300  148.2800       8.1        28       900        97
VIS    2025250    200200   15.7300  148.2600       7.9        27       909        94
VIS    2025250    200200   15.7400  148.2300       6.3        21       924        90
VIS    2025250    200200   15.7200  148.1700       7.5        17       969        90
VIS    2025250    200200   15.7300  148.1300       7.5       356       957        95
VIS    2025250    200200   15.7200  148.0900       8.1         2       954        91
VIS    2025250    200200   15.7300  147.9700       8.5        12       912        90
VIS    2025250    200200   15.7400  147.9700       8.4        13       911        90
VIS    2025250    200200   15.7300  147.9400       7.9        12       911        91
VIS    2025250    200200   15.7200  147.8200       7.0        10       920        93
VIS    2025250    200200   15.7200  147.8100       6.9         9       922        93
VIS    2025250    200200   15.7100  147.7800       6.7         3       926        93
VIS    2025250    200200   15.7300  147.7200       6.9       352       919        90
VIS    2025250    200200   15.7300  147.7000       7.0       351       921        90
VIS    2025250    200200   15.7200  147.6600       7.4       348       923        90
VIS    2025250    200200   15.7300  147.6400       7.4       352       920        93
VIS    2025250    200200   15.7300  147.5700       7.0       355       920        90
VIS    2025250    200200   15.7300  147.4600       7.9       348       935        90
VIS    2025250    200200   15.7300  147.4600       8.0       348       935        90
VIS    2025250    200200   15.7200  147.3900       6.6       346       916        93
VIS    2025250    200200   15.7100  147.3700       5.7       347       914        94
VIS    2025250    200200   15.7200  147.3400       5.0       350       912        91
VIS    2025250    200200   15.7200  147.3400       5.0       351       912        90
VIS    2025250    200200   15.7200  147.3000       5.5       348       913        93
VIS    2025250    200200   15.7200  147.2900       6.6       346       916        93
VIS    2025250    200200   15.7200  147.2600       7.4       343       913        91
VIS    2025250    200200   15.7200  147.0700       7.2       329       905        91
VIS    2025250    200200   15.7100  147.0400       7.0       332       905        90
VIS    2025250    200200   15.7200  147.0200       7.5       333       887        91
VIS    2025250    200200   15.7200  146.8900       7.6       335       920        93
VIS    2025250    200200   15.7300  146.8000       7.2       324       912        90
VIS    2025250    200200   15.7100  146.5900       7.5       325       933        98
VIS    2025250    200200   15.7200  146.5700       7.6       322       933        92
VIS    2025250    200200   15.7200  146.5400       8.8       316       921        90
VIS    2025250    200200   15.6800  142.4800       6.2       184       978        94
VIS    2025250    200200   15.6800  142.4600       6.4       184       974        94
VIS    2025250    200200   15.7100  150.1200       7.4         9       998        96
VIS    2025250    200200   15.7200  150.1100       7.6         9       996        96
VIS    2025250    200200   15.7300  150.0700       7.7        25       964        93
VIS    2025250    200200   15.7300  150.0300       6.9        29       971        91
VIS    2025250    200200   15.7100  150.0000       7.0        24       970        93
VIS    2025250    200200   15.7300  149.9200       7.1        12       994        93
VIS    2025250    200200   15.7300  149.8200       7.4         7       967        95
VIS    2025250    200200   15.7100  148.5400       7.1         9       954        98
VIS    2025250    200200   15.7000  148.5300       7.1        15       939        96
VIS    2025250    200200   15.7200  148.4900       7.8        13       910        96
VIS    2025250    200200   15.7100  148.4700       7.8        19       907        93
VIS    2025250    200200   15.7000  148.4500       7.8        25       906        96
VIS    2025250    200200   15.7000  148.4300       7.8        20       907        98
VIS    2025250    200200   15.7100  148.4000       8.5        13       910        96
VIS    2025250    200200   15.7000  148.3700       8.3        19       920        97
VIS    2025250    200200   15.7000  148.3600       8.0        21       927        96
VIS    2025250    200200   15.7100  148.3400       7.4        21       934        97
VIS    2025250    200200   15.7000  148.3000       7.4        25       911        98
VIS    2025250    200200   15.7100  148.2800       8.0        25       911        96
VIS    2025250    200200   15.7100  148.2600       7.7        23       911        95
VIS    2025250    200200   15.7000  148.1500       7.6         7       946        94
VIS    2025250    200200   15.7000  148.1200       8.0         4       941        94
VIS    2025250    200200   15.6900  148.1200       8.0         4       941        93
VIS    2025250    200200   15.7100  148.0900       8.0       358       951        96
VIS    2025250    200200   15.7000  147.8800       6.7         8       923        93
VIS    2025250    200200   15.7100  147.8300       7.2        11       928        91
VIS    2025250    200200   15.7000  147.8300       7.1        10       935        92
VIS    2025250    200200   15.7100  147.7700       6.6         4       926        95
VIS    2025250    200200   15.7000  147.6900       7.4       340       930        90
VIS    2025250    200200   15.7000  147.6700       7.3       343       928        91
VIS    2025250    200200   15.7100  147.6500       7.1       351       928        90
VIS    2025250    200200   15.6900  147.4900       6.6       344       947        94
VIS    2025250    200200   15.6900  147.4600       7.2       339       938        97
VIS    2025250    200200   15.7000  147.4200       7.6       337       922        95
VIS    2025250    200200   15.7000  147.4200       7.5       338       922        96
VIS    2025250    200200   15.6900  147.3700       5.4       344       912        93
VIS    2025250    200200   15.6900  147.3700       5.2       346       912        96
VIS    2025250    200200   15.6900  147.3400       4.8       349       911        92
VIS    2025250    200200   15.7000  147.3000       5.2       347       912        90
VIS    2025250    200200   15.6900  147.2900       5.9       344       912        94
VIS    2025250    200200   15.6900  147.2500       6.3       339       912        93
VIS    2025250    200200   15.7000  147.2400       6.5       340       909        93
VIS    2025250    200200   15.6900  147.2000       6.6       336       896        95
VIS    2025250    200200   15.6900  147.1900       7.4       334       903        90
VIS    2025250    200200   15.6800  147.1500       7.4       338       908        91
VIS    2025250    200200   15.6800  147.1100       6.5       341       930        94
VIS    2025250    200200   15.6800  147.0800       6.3       338       929        94
VIS    2025250    200200   15.6800  146.8400       7.0       349       908        90
VIS    2025250    200200   15.6800  146.8100       6.2       331       893        90
VIS    2025250    200200   15.6800  146.4000       8.1       315       940        99
VIS    2025250    200200   15.7000  150.6900       8.6        45       990        91
VIS    2025250    200200   15.7000  150.5600       6.3        32       996        93
VIS    2025250    200200   15.7100  150.1700       7.2        25       994        94
VIS    2025250    200200   15.7000  150.1400       7.2        17       994        97
VIS    2025250    200200   15.7100  150.1200       7.3        10       996        97
VIS    2025250    200200   15.6900  150.0900       7.2        16       979        98
VIS    2025250    200200   15.6900  150.0500       6.2        22       959        94
VIS    2025250    200200   15.7100  149.8900       6.7        11       987        95
VIS    2025250    200200   15.6900  148.5500       6.9        12       951        97
VIS    2025250    200200   15.6800  148.5300       7.3        21       939        96
VIS    2025250    200200   15.6800  148.5100       7.5        28       923        95
VIS    2025250    200200   15.6900  148.4800       7.6        27       910        96
VIS    2025250    200200   15.6900  148.4600       7.8        28       907        93
VIS    2025250    200200   15.6800  148.4500       7.8        28       907        95
VIS    2025250    200200   15.6700  148.3900       6.9        24       909        90
VIS    2025250    200200   15.6800  148.3600       7.4        20       919        95
VIS    2025250    200200   15.6800  148.3500       7.2        19       919        97
VIS    2025250    200200   15.6800  148.3200       7.4        21       918        98
VIS    2025250    200200   15.6800  148.3000       8.0        28       917        94
VIS    2025250    200200   15.6700  148.2800       7.6        29       919        95
VIS    2025250    200200   15.6800  148.2500       6.2        25       915        95
VIS    2025250    200200   15.6900  148.1600       7.3         5       928        96
VIS    2025250    200200   15.6700  148.1400       7.5         5       921        95
VIS    2025250    200200   15.6700  148.1300       7.4         5       921        95
VIS    2025250    200200   15.6800  148.0900       8.2         2       950        94
VIS    2025250    200200   15.6800  148.0800       8.2         4       951        93
VIS    2025250    200200   15.6700  147.7000       8.0       345       964        97
VIS    2025250    200200   15.6800  147.6900       7.5       344       958        95
VIS    2025250    200200   15.6700  147.6600       7.3       349       941        96
VIS    2025250    200200   15.6800  147.5100       6.4       340       948        96
VIS    2025250    200200   15.6800  147.5000       6.1       343       948        96
VIS    2025250    200200   15.6700  147.4600       7.0       335       943        97
VIS    2025250    200200   15.6600  147.4500       7.6       332       943        97
VIS    2025250    200200   15.6800  147.4300       8.0       331       918        93
VIS    2025250    200200   15.6700  147.3900       6.8       341       908        97
VIS    2025250    200200   15.6600  147.3800       7.0       339       915        97
VIS    2025250    200200   15.6800  147.3400       5.2       346       911        95
VIS    2025250    200200   15.6800  147.3300       4.8       349       911        97
VIS    2025250    200200   15.6700  147.2900       7.1       338       911        96
VIS    2025250    200200   15.6700  147.2800       7.4       336       912        96
VIS    2025250    200200   15.6600  147.2400       5.7       341       918        95
VIS    2025250    200200   15.6600  147.2200       6.4       336       924        98
VIS    2025250    200200   15.6800  147.1900       7.6       332       908        92
VIS    2025250    200200   15.6800  147.1900       7.9       332       908        90
VIS    2025250    200200   15.6700  147.1600       7.6       332       917        93
VIS    2025250    200200   15.6800  147.1400       6.6       342       909        93
VIS    2025250    200200   15.6700  147.1200       6.3       346       910        91
VIS    2025250    200200   15.6600  147.0700       5.9       344       910        94
VIS    2025250    200200   15.6600  147.0500       5.9       338       916        90
VIS    2025250    200200   15.6700  146.3700       8.3       306       925        94
VIS    2025250    200200   15.6400  142.5100       6.5       179       974        94
VIS    2025250    200200   15.6300  142.5000       6.4       180       974        92
VIS    2025250    200200   15.6700  150.1700       6.8        25       990        98
VIS    2025250    200200   15.6700  150.0800       6.7        20       947        99
VIS    2025250    200200   15.6500  148.5700       7.1        18       952        94
VIS    2025250    200200   15.6500  148.5600       7.3        20       952        93
VIS    2025250    200200   15.6500  148.5100       6.6        22       938        92
VIS    2025250    200200   15.6500  148.4800       6.2        16       921        97
VIS    2025250    200200   15.6600  148.4500       8.0        29       910        93
VIS    2025250    200200   15.6600  148.4400       8.1        31       910        90
VIS    2025250    200200   15.6600  148.3700       7.4        28       915        92
VIS    2025250    200200   15.6500  148.3400       8.0        15       925        96
VIS    2025250    200200   15.6500  148.3100       8.0        17       918        95
VIS    2025250    200200   15.6500  148.2800       7.9        25       931        95
VIS    2025250    200200   15.6600  148.2700       7.2        23       918        98
VIS    2025250    200200   15.6500  148.2300       7.3        21       919        90
VIS    2025250    200200   15.6500  148.2200       7.3        18       922        90
VIS    2025250    200200   15.6500  148.1800       7.2         4       923        96
VIS    2025250    200200   15.6600  148.1700       7.0         3       923        97
VIS    2025250    200200   15.6600  148.1400       7.0         9       917        93
VIS    2025250    200200   15.6600  148.1300       6.9         7       921        92
VIS    2025250    200200   15.6600  148.1000       7.3         7       935        94
VIS    2025250    200200   15.6400  148.0800       6.9        12       940        91
VIS    2025250    200200   15.6400  148.0500       7.1         9       942        93
VIS    2025250    200200   15.6500  147.9900       7.2       359       975        95
VIS    2025250    200200   15.6500  147.9700       7.5       354       975        98
VIS    2025250    200200   15.6600  147.6900       7.6       346       964        98
VIS    2025250    200200   15.6600  147.6800       7.4       347       958        97
VIS    2025250    200200   15.6600  147.6600       7.2       348       945        95
VIS    2025250    200200   15.6600  147.5500       6.5       334       957        96
VIS    2025250    200200   15.6400  147.4900       6.6       344       962        99
VIS    2025250    200200   15.6600  147.4500       7.5       333       943        98
VIS    2025250    200200   15.6400  147.4300       7.8       333       925        95
VIS    2025250    200200   15.6400  147.4200       8.1       332       925        94
VIS    2025250    200200   15.6400  147.3900       8.4       336       925        94
VIS    2025250    200200   15.6400  147.3700       8.4       339       925        94
VIS    2025250    200200   15.6500  147.3500       7.3       339       922        96
VIS    2025250    200200   15.6500  147.3300       7.3       335       918        96
VIS    2025250    200200   15.6400  147.3000       8.3       333       918        92
VIS    2025250    200200   15.6400  147.2600       7.3       340       927        97
VIS    2025250    200200   15.6400  147.2500       7.2       340       927        96
VIS    2025250    200200   15.6400  147.2100       7.7       336       926        96
VIS    2025250    200200   15.6400  147.2000       7.8       336       926        96
VIS    2025250    200200   15.6400  147.1600       7.0       335       924        95
VIS    2025250    200200   15.6400  147.1600       7.0       335       920        95
VIS    2025250    200200   15.6400  147.0600       6.7       346       892        91
VIS    2025250    200200   15.6400  147.0600       6.6       341       909        93
VIS    2025250    200200   15.6300  146.9400       6.9       341       938        95
VIS    2025250    200200   15.6500  146.5400       8.7       319       910        92
VIS    2025250    200200   15.6300  146.5100       7.6       316       923        97
VIS    2025250    200200   15.6300  146.5100       7.0       317       880        94
VIS    2025250    200200   15.6400  146.4000       5.7       316       903        93
VIS    2025250    200200   15.6100  142.5700       5.5       184       909        93
VIS    2025250    200200   15.6100  142.5500       5.7       188       909        99
VIS    2025250    200200   15.6600  150.3500       6.8        31       981        92
VIS    2025250    200200   15.6600  150.0900       7.2        18       959        93
VIS    2025250    200200   15.6400  148.5800       7.2        18       952        95
VIS    2025250    200200   15.6400  148.5500       6.9        23       952        91
VIS    2025250    200200   15.6400  148.4800       6.0        18       926        95
VIS    2025250    200200   15.6400  148.4600       6.8        15       915        96
VIS    2025250    200200   15.6200  148.4500       7.0        13       916        94
VIS    2025250    200200   15.6300  148.4100       8.1        25       910        95
VIS    2025250    200200   15.6200  148.3900       8.3        25       910        97
VIS    2025250    200200   15.6200  148.3700       8.4        23       910        96
VIS    2025250    200200   15.6300  148.3300       8.6        11       917        94
VIS    2025250    200200   15.6400  148.3200       8.1        14       918        95
VIS    2025250    200200   15.6400  148.3000       8.2        16       918        95
VIS    2025250    200200   15.6200  148.2600       8.0        18       916        98
VIS    2025250    200200   15.6200  148.2500       7.8        18       918        98
VIS    2025250    200200   15.6400  148.2300       7.3        19       921        92
VIS    2025250    200200   15.6300  148.1900       7.6        11       923        93
VIS    2025250    200200   15.6300  148.1700       7.5        14       923        92
VIS    2025250    200200   15.6400  148.1100       6.8         8       934        91
VIS    2025250    200200   15.6400  148.0800       6.8        11       940        92
VIS    2025250    200200   15.6300  148.0400       7.3         6       940        94
VIS    2025250    200200   15.6200  148.0200       7.4         6       938        95
VIS    2025250    200200   15.6300  147.9400       7.3       354       957        99
VIS    2025250    200200   15.6200  147.9100       6.8         3       963        96
VIS    2025250    200200   15.6200  147.6200       6.8       339       968        97
VIS    2025250    200200   15.6200  147.5200       7.4       353       956        95
VIS    2025250    200200   15.6200  147.5000       7.2       354       964        97
VIS    2025250    200200   15.6300  147.4900       7.4       349       966        99
VIS    2025250    200200   15.6300  147.4600       7.3       340       964       100
VIS    2025250    200200   15.6200  147.4400       7.2       339       950       100
VIS    2025250    200200   15.6300  147.4100       8.1       335       947        97
VIS    2025250    200200   15.6200  147.3800       8.7       339       929        91
VIS    2025250    200200   15.6100  147.3600       8.7       341       940        92
VIS    2025250    200200   15.6100  147.3300       8.3       337       940        93
VIS    2025250    200200   15.6100  147.3000       8.2       338       932        90
VIS    2025250    200200   15.6200  147.2800       8.1       340       928        93
VIS    2025250    200200   15.6100  147.2000       8.0       339       940        94
VIS    2025250    200200   15.6300  147.1600       7.1       336       924        95
VIS    2025250    200200   15.6300  147.1500       7.2       337       924        90
VIS    2025250    200200   15.6300  147.0700       6.8       348       885        90
VIS    2025250    200200   15.6100  147.0300       6.1       341       909        92
VIS    2025250    200200   15.6200  146.9500       7.0       339       913        96
VIS    2025250    200200   15.6100  146.9100       7.3       330       884        92
VIS    2025250    200200   15.6100  146.5900       9.3       324       932        96
VIS    2025250    200200   15.6300  146.5100       7.1       316       913        98
VIS    2025250    200200   15.5800  142.5800       5.7       188       802        90
VIS    2025250    200200   15.5900  142.5600       5.5       189       909        99
VIS    2025250    200200   15.5800  142.2000       5.7       187       979        93
VIS    2025250    200200   15.6200  148.4400       7.1        13       916        93
VIS    2025250    200200   15.6000  148.4000       7.7        18       911        98
VIS    2025250    200200   15.6200  148.3900       8.3        24       910        97
VIS    2025250    200200   15.6100  148.3700       8.5        25       908        96
VIS    2025250    200200   15.6000  148.3400       8.1        15       908        97
VIS    2025250    200200   15.6000  148.3300       7.9        12       907        97
VIS    2025250    200200   15.6100  148.2900       7.8        20       910        98
VIS    2025250    200200   15.6100  148.2700       8.0        23       910        98
VIS    2025250    200200   15.6100  148.2500       7.7        19       921        98
VIS    2025250    200200   15.6100  148.2200       7.2        19       921        92
VIS    2025250    200200   15.6000  148.1900       7.7        20       917        91
VIS    2025250    200200   15.6000  148.1800       8.1        18       919        90
VIS    2025250    200200   15.6100  148.1600       8.1        14       925        90
VIS    2025250    200200   15.6100  148.1100       8.2         5       934        93
VIS    2025250    200200   15.6000  148.0900       8.0         3       934        94
VIS    2025250    200200   15.6100  148.0800       7.7         7       938        94
VIS    2025250    200200   15.6000  148.0400       7.1        12       924        94
VIS    2025250    200200   15.6100  148.0100       7.3        15       938        90
VIS    2025250    200200   15.6100  147.9500       7.2       354       957        97
VIS    2025250    200200   15.6100  147.9400       7.1       355       941        97
VIS    2025250    200200   15.6000  147.9000       7.4       353       968        99
VIS    2025250    200200   15.6100  147.6300       6.8       339       968        98
VIS    2025250    200200   15.6000  147.6000       6.8       336       968        96
VIS    2025250    200200   15.6000  147.6000       6.8       335       968        95
VIS    2025250    200200   15.5900  147.5700       7.0       335       974        98
VIS    2025250    200200   15.6100  147.5100       7.1       351       956        96
VIS    2025250    200200   15.5900  147.4800       7.2       346       950        99
VIS    2025250    200200   15.6000  147.4600       7.2       344       950        99
VIS    2025250    200200   15.6100  147.4400       7.2       340       950       100
VIS    2025250    200200   15.6000  147.4100       7.8       342       950        97
VIS    2025250    200200   15.6100  147.3700       8.6       341       940        93
VIS    2025250    200200   15.5900  147.3300       8.6       342       949        94
VIS    2025250    200200   15.6000  147.2900       8.4       341       941        90
VIS    2025250    200200   15.6000  147.2800       8.5       341       939        90
VIS    2025250    200200   15.6100  147.2100       8.0       339       947        93
VIS    2025250    200200   15.5900  147.0600       7.5       334       880        91
VIS    2025250    200200   15.5900  147.0200       7.2       341       903        90
VIS    2025250    200200   15.5900  147.0200       7.4       340       920        94
VIS    2025250    200200   15.5900  146.9000       7.2       329       890        92
VIS    2025250    200200   15.5900  146.5900       8.5       321       890        91
VIS    2025250    200200   15.5900  146.5900       8.7       321       890        91
VIS    2025250    200200   15.5700  142.5800       5.7       188       799        92
VIS    2025250    200200   15.5600  142.1900       5.3       183       941        90
VIS    2025250    200200   15.5700  142.1600       6.2       177       946        99
VIS    2025250    200200   15.5800  148.5800       7.9       355       975        96
VIS    2025250    200200   15.5800  148.3900       6.3        12       934        97
VIS    2025250    200200   15.5800  148.3700       7.1        26       908        99
VIS    2025250    200200   15.5900  148.3400       7.9        21       908        98
VIS    2025250    200200   15.5900  148.3300       7.7        16       907        98
VIS    2025250    200200   15.5700  148.2900       7.0        15       905        99
VIS    2025250    200200   15.5700  148.2800       7.1        20       908        98
VIS    2025250    200200   15.5800  148.2600       7.0        16       921        98
VIS    2025250    200200   15.5700  148.2300       6.8        14       921        93
VIS    2025250    200200   15.5700  148.2000       7.0        21       919        91
VIS    2025250    200200   15.5800  148.1800       7.5        17       919        91
VIS    2025250    200200   15.5700  148.1600       7.5         9       925        94
VIS    2025250    200200   15.5700  148.1300       7.6         4       923        95
VIS    2025250    200200   15.5700  148.1000       7.5       360       934        97
VIS    2025250    200200   15.5800  148.0800       7.1         2       933        97
VIS    2025250    200200   15.5900  147.9100       7.3       352       963        99
VIS    2025250    200200   15.5800  147.8800       7.0       354       958        99
VIS    2025250    200200   15.5800  147.8700       6.9       356       958        99
VIS    2025250    200200   15.5800  147.8400       7.1         3       960        95
VIS    2025250    200200   15.5900  147.6200       7.0       339       973        99
VIS    2025250    200200   15.5800  147.6200       7.2       340       974        99
VIS    2025250    200200   15.5700  147.5700       7.3       338       974        99
VIS    2025250    200200   15.5700  147.5600       7.1       336       968        99
VIS    2025250    200200   15.5800  147.5300       6.8       332       974        98
VIS    2025250    200200   15.5800  147.5100       7.3       346       962        97
VIS    2025250    200200   15.5800  147.4800       7.7       348       950        98
VIS    2025250    200200   15.5700  147.4500       8.1       348       939        96
VIS    2025250    200200   15.5700  147.1400       9.0       327       969        98
VIS    2025250    200200   15.5600  147.1300       9.2       328       969        98
VIS    2025250    200200   15.5700  147.0100       7.7       338       930        92
VIS    2025250    200200   15.5400  143.1800       7.6       190       906        93
VIS    2025250    200200   15.5400  143.1600       8.2       188       906        90
VIS    2025250    200200   15.5300  142.5200       6.3       179       945        92
VIS    2025250    200200   15.5300  142.5000       6.6       178       963        94
VIS    2025250    200200   15.5300  142.4900       6.6       178       963        94
VIS    2025250    200200   15.5500  142.1700       5.7       178       941        96
VIS    2025250    200200   15.5800  150.8200       7.6        42       999        95
VIS    2025250    200200   15.5700  148.5700       7.8       353       967        97
VIS    2025250    200200   15.5700  148.4100       6.1         1       943        92
VIS    2025250    200200   15.5600  148.3700       6.1         2       948        99
VIS    2025250    200200   15.5600  148.3600       6.3         8       934        98
VIS    2025250    200200   15.5600  148.2700       6.4        11       915        97
VIS    2025250    200200   15.5700  148.2400       6.7        13       923        92
VIS    2025250    200200   15.5700  148.2200       6.4        14       921        93
VIS    2025250    200200   15.5700  148.1800       6.9        19       923        93
VIS    2025250    200200   15.5600  148.1600       6.6         6       925        97
VIS    2025250    200200   15.5500  148.1000       6.8       353       952        96
VIS    2025250    200200   15.5700  147.8900       6.4       355       958        99
VIS    2025250    200200   15.5700  147.8800       6.8       355       958        99
VIS    2025250    200200   15.5600  147.8500       7.0         2       960        93
VIS    2025250    200200   15.5400  147.6000       8.2       345       973        90
VIS    2025250    200200   15.5500  147.5800       7.8       342       973        94
VIS    2025250    200200   15.5600  147.5600       7.2       337       964        98
VIS    2025250    200200   15.5600  147.5500       7.3       337       951        97
VIS    2025250    200200   15.5500  147.5300       7.4       334       949        98
VIS    2025250    200200   15.5400  147.5000       7.4       340       940        99
VIS    2025250    200200   15.5500  147.4600       8.4       347       937        94
VIS    2025250    200200   15.5600  147.4600       8.5       348       937        93
VIS    2025250    200200   15.5600  147.1600       8.4       327       970        99
VIS    2025250    200200   15.5500  147.1400       9.7       328       969        97
VIS    2025250    200200   15.5500  146.9900       6.5       332       940        90
VIS    2025250    200200   15.5200  143.2200       6.3       195       917        95
VIS    2025250    200200   15.5100  143.1900       7.1       190       917        94
VIS    2025250    200200   15.5100  143.1700       7.7       194       914        92
VIS    2025250    200200   15.5100  143.1600       7.7       194       894        93
VIS    2025250    200200   15.5200  143.1200       7.1       188       855        94
VIS    2025250    200200   15.5100  142.5400       5.9       184       886        92
VIS    2025250    200200   15.5200  142.5000       6.4       180       942        92
VIS    2025250    200200   15.5300  142.4900       6.4       179       963        95
VIS    2025250    200200   15.5200  142.4700       6.2       181       955        91
VIS    2025250    200200   15.5600  151.0200       8.3        54       982        93
VIS    2025250    200200   15.5500  148.3700       6.1       357       963        98
VIS    2025250    200200   15.5400  147.8400       6.7       358       960        95
VIS    2025250    200200   15.5400  147.5400       7.4       336       949        95
VIS    2025250    200200   15.5400  147.5300       7.4       336       949        96
VIS    2025250    200200   15.5200  147.5000       7.5       339       935        94
VIS    2025250    200200   15.5300  147.4700       7.7       343       935        97
VIS    2025250    200200   15.5200  147.4600       7.6       340       925        94
VIS    2025250    200200   15.5200  147.4100       8.1       337       929        93
VIS    2025250    200200   15.5200  147.3700       8.3       335       948        96
VIS    2025250    200200   15.5200  147.3600       8.2       334       948        95
VIS    2025250    200200   15.5000  143.1800       7.4       190       894        94
VIS    2025250    200200   15.4900  143.1700       7.7       190       879        93
VIS    2025250    200200   15.4900  143.1400       7.3       193       855        95
VIS    2025250    200200   15.5100  142.5300       6.6       184       902        92
VIS    2025250    200200   15.4900  142.4100       6.5       184       962        90
VIS    2025250    200200   15.5400  151.0600       7.4        54       987        96
VIS    2025250    200200   15.5200  148.3700       6.6       358       980        97
VIS    2025250    200200   15.5200  148.3500       6.8         3       980        93
VIS    2025250    200200   15.5100  148.2700       7.0        10       950        95
VIS    2025250    200200   15.5000  148.2700       7.0         7       950        97
VIS    2025250    200200   15.5100  148.2400       7.7         1       966        94
VIS    2025250    200200   15.5200  147.9100       6.0       351       985        95
VIS    2025250    200200   15.5100  147.5300       7.8       338       944        90
VIS    2025250    200200   15.5100  147.5100       7.7       339       939        92
VIS    2025250    200200   15.5100  147.4800       7.3       339       935        96
VIS    2025250    200200   15.5100  147.4700       7.3       338       932        97
VIS    2025250    200200   15.5100  147.4400       7.4       336       921        93
VIS    2025250    200200   15.5000  147.4300       7.7       334       918        94
VIS    2025250    200200   15.4900  147.3900       7.5       335       926        97
VIS    2025250    200200   15.4900  147.3600       7.3       340       939        98
VIS    2025250    200200   15.5000  147.3400       7.3       338       948        98
VIS    2025250    200200   15.4600  142.5200       6.5       183       898        93
VIS    2025250    200200   15.5100  151.0600       6.9        60       982        90
VIS    2025250    200200   15.4800  148.2700       7.3        11       949        98
VIS    2025250    200200   15.5000  148.2700       7.0         8       950        98
VIS    2025250    200200   15.4800  148.2400       8.3        12       950        90
VIS    2025250    200200   15.4800  148.1900       9.0        10       994        90
VIS    2025250    200200   15.4800  147.4500       7.6       338       934        91
VIS    2025250    200200   15.4800  147.4400       7.4       337       918        94
VIS    2025250    200200   15.4700  147.4100       6.4       336       916        98
VIS    2025250    200200   15.4900  147.3900       7.3       335       924        97
VIS    2025250    200200   15.4700  147.3600       6.8       345       930        97
VIS    2025250    200200   15.4700  147.3400       7.0       342       939        97
VIS    2025250    200200   15.4700  147.3100       7.5       337       944        98
VIS    2025250    200200   15.4700  147.3000       7.8       333       945        95
VIS    2025250    200200   15.4700  147.2700       8.3       326       955        94
VIS    2025250    200200   15.4700  147.2300       6.2       338       980        96
VIS    2025250    200200   15.4400  142.5300       6.9       182       892        90
VIS    2025250    200200   15.4600  142.5100       6.4       182       866        93
VIS    2025250    200200   15.4600  142.2100       5.9       191       958        95
VIS    2025250    200200   15.5000  151.0700       7.0        62       981        92
VIS    2025250    200200   15.4700  148.3300       7.7         1       982        93
VIS    2025250    200200   15.4500  148.3100       7.2         8       951        98
VIS    2025250    200200   15.4700  148.2600       7.5        12       943        98
VIS    2025250    200200   15.4500  148.2400       7.8        19       943        93
VIS    2025250    200200   15.4500  148.1800       8.3        10       952        91
VIS    2025250    200200   15.4500  148.1600       8.0         9       954        92
VIS    2025250    200200   15.4500  148.1500       8.0         9       957        92
VIS    2025250    200200   15.4700  147.4600       7.8       340       952        90
VIS    2025250    200200   15.4600  147.4200       6.7       335       922        98
VIS    2025250    200200   15.4600  147.3800       7.0       339       924        95
VIS    2025250    200200   15.4500  147.3500       7.6       337       930        92
VIS    2025250    200200   15.4500  147.3400       8.0       333       930        91
VIS    2025250    200200   15.4600  147.3000       7.6       334       945        97
VIS    2025250    200200   15.4600  147.3000       7.9       334       945        96
VIS    2025250    200200   15.4500  147.2700       7.3       337       931        98
VIS    2025250    200200   15.4400  147.2300       6.0       342       957        95
VIS    2025250    200200   15.4400  147.2200       5.8       343       957        91
VIS    2025250    200200   15.4600  146.8500       7.2       332       973        99
VIS    2025250    200200   15.4400  148.4700       7.6        16       979        90
VIS    2025250    200200   15.4300  148.4200       7.1        18       993        90
VIS    2025250    200200   15.4300  148.3900       7.4        16       993        91
VIS    2025250    200200   15.4300  148.3500       7.3        10       977        92
VIS    2025250    200200   15.4300  148.3200       7.4        12       973        93
VIS    2025250    200200   15.4500  148.3200       7.3         9       957        97
VIS    2025250    200200   15.4400  148.2700       7.0        17       949        96
VIS    2025250    200200   15.4500  148.1500       7.7         9       954        93
VIS    2025250    200200   15.4400  147.4000       7.5       335       924        96
VIS    2025250    200200   15.4400  147.3100       8.3       334       933        92
VIS    2025250    200200   15.4300  147.2700       7.1       338       931        99
VIS    2025250    200200   15.4300  147.2600       6.7       339       931        99
VIS    2025250    200200   15.4200  147.2300       5.8       340       931        91
VIS    2025250    200200   15.4200  147.1100       7.8       331       964        99
VIS    2025250    200200   15.4200  147.1000       8.0       330       964        98
VIS    2025250    200200   15.4200  147.0600      11.1       318       985        91
VIS    2025250    200200   15.4200  147.0500      11.3       318       986        91
VIS    2025250    200200   15.4100  148.4900       6.8        22       963        90
VIS    2025250    200200   15.4200  148.3800       6.2        11       978        91
VIS    2025250    200200   15.4200  148.3700       6.9         9       978        91
VIS    2025250    200200   15.4300  148.3400       7.2         9       973        93
VIS    2025250    200200   15.4000  147.4800       6.3       350       971        95
VIS    2025250    200200   15.4000  147.4400       6.7       355       964        94
VIS    2025250    200200   15.4100  147.4200       7.0       344       956        95
VIS    2025250    200200   15.4100  147.4100       7.2       340       956        94
VIS    2025250    200200   15.4000  147.3800       7.2       333       955        92
VIS    2025250    200200   15.4100  147.3000       7.8       335       941        97
VIS    2025250    200200   15.4100  147.2800       7.0       338       931        99
VIS    2025250    200200   15.4000  147.2600       7.1       332       931        97
VIS    2025250    200200   15.4000  147.2400       6.8       331       931        98
VIS    2025250    200200   15.4100  147.2200       6.1       337       941        90
VIS    2025250    200200   15.4000  147.1300       7.2       342       966        98
VIS    2025250    200200   15.4000  147.1100       7.5       338       962        93
VIS    2025250    200200   15.4000  147.1000       7.8       331       916        90
VIS    2025250    200200   15.3900  147.0300       7.9       323       957        95
VIS    2025250    200200   15.3700  142.1900       5.0       186       924        93
VIS    2025250    200200   15.3800  147.5800       6.4       336       976        97
VIS    2025250    200200   15.3800  147.5700       6.4       337       976        96
VIS    2025250    200200   15.3700  147.5100       6.1       343       981        98
VIS    2025250    200200   15.3700  147.4800       7.1       337       970        95
VIS    2025250    200200   15.3900  147.4500       6.7       347       964        97
VIS    2025250    200200   15.3800  147.4400       6.7       348       956        98
VIS    2025250    200200   15.3700  147.4100       5.9       353       955        94
VIS    2025250    200200   15.3900  147.3700       7.1       334       955        91
VIS    2025250    200200   15.3900  147.3600       7.8       330       962        91
VIS    2025250    200200   15.3900  147.2800       7.6       333       941        94
VIS    2025250    200200   15.3900  147.2500       7.3       329       931        95
VIS    2025250    200200   15.3900  147.1200       7.3       341       962        90
VIS    2025250    200200   15.3400  142.2200       5.4       190       892        94
VIS    2025250    200200   15.3400  142.2000       5.1       186       900        96
VIS    2025250    200200   15.3500  142.1800       5.3       187       908        92
VIS    2025250    200200   15.3500  147.6000       6.8       339       973        97
VIS    2025250    200200   15.3600  147.4600       7.8       333       965        97
VIS    2025250    200200   15.3600  147.4300       6.7       338       949        90
VIS    2025250    200200   15.3200  142.5400       6.8       189       947        92
VIS    2025250    200200   15.3600  151.2300       7.6        55       982        92
VIS    2025250    200200   15.3500  149.4500       7.3         2       982        98
VIS    2025250    200200   15.3300  148.2400       7.8         6       992        93
VIS    2025250    200200   15.3300  148.1900       6.5         2       996        96
VIS    2025250    200200   15.3300  148.1800       6.3         3       996        96
VIS    2025250    200200   15.3500  147.4600       8.4       331       965        96
VIS    2025250    200200   15.3000  142.5200       6.6       189       931        96
VIS    2025250    200200   15.3500  151.2600       7.6        59       982        93
VIS    2025250    200200   15.3300  149.4600       7.4         4       982        95
VIS    2025250    200200   15.3100  148.2400       6.7         0       989        92
VIS    2025250    200200   15.3100  148.2200       6.9         5       992        94
VIS    2025250    200200   15.3200  148.2000       6.5         5       968        96
VIS    2025250    200200   15.2800  142.8000       7.0       184       927        93
VIS    2025250    200200   15.2700  142.7800       7.3       184       927        90
VIS    2025250    200200   15.2700  142.4700       5.6       185       902        99
VIS    2025250    200200   15.2700  142.3700       4.9       188       951        96
VIS    2025250    200200   15.3000  149.5000       7.3         6       994        95
VIS    2025250    200200   15.3200  149.4200       7.1         5       982        92
VIS    2025250    200200   15.3000  149.3800       7.1        11       999       100
VIS    2025250    200200   15.3000  149.3700       7.1        10       999       100
VIS    2025250    200200   15.3000  148.2700       7.5       349       989        97
VIS    2025250    200200   15.2900  148.2200       6.9        11       975        92
VIS    2025250    200200   15.2500  142.7700       7.2       184       912        92
VIS    2025250    200200   15.2500  142.4100       6.1       187       948        93
VIS    2025250    200200   15.2700  148.2600       7.3       358       981        92
VIS    2025250    200200   15.2300  144.0700       7.7        95       191        92
VIS    2025250    200200   15.2200  142.4300       5.4       186       923        96
VIS    2025250    200200   15.2400  142.4000       6.0       188       949        92
VIS    2025250    200200   15.2500  148.1500       8.2        10       984        90
VIS    2025250    200200   15.2000  142.9300       5.7       191       892        92
VIS    2025250    200200   15.2100  142.9100       6.2       189       899        93
VIS    2025250    200200   15.2000  142.8800       6.7       192       931        93
VIS    2025250    200200   15.1800  142.9200       5.9       186       873        96
VIS    2025250    200200   15.1800  142.9000       6.0       188       873        95
VIS    2025250    200200   15.1900  142.6400       6.5       191       950        90
VIS    2025250    200200   15.2000  149.4500       7.4         5       987        97
VIS    2025250    200200   15.2000  149.4200       7.4         7       964        97
VIS    2025250    200200   15.2100  149.3900       8.2         4       964        91
VIS    2025250    200200   15.1500  142.9500       5.9       194       849        98
VIS    2025250    200200   15.1700  142.9300       5.8       186       873        97
VIS    2025250    200200   15.1700  142.8900       5.9       188       871        95
VIS    2025250    200200   15.1600  142.8900       5.7       188       875        92
VIS    2025250    200200   15.1700  142.6600       5.8       191       950        97
VIS    2025250    200200   15.1900  149.3800       8.0         6       964        96
VIS    2025250    200200   15.1800  149.3500       7.8         6       987        97
VIS    2025250    200200   15.1500  143.0400       5.4       182       852        91
VIS    2025250    200200   15.1300  142.9500       6.1       196       885        96
VIS    2025250    200200   15.1400  142.9400       6.2       195       873        95
VIS    2025250    200200   15.1400  142.9300       6.4       190       875        93
VIS    2025250    200200   15.1500  149.3700       7.8         7       986        96
VIS    2025250    200200   15.1200  143.2200       5.4       191       950        90
VIS    2025250    200200   15.1200  143.0100       6.4       190       905        92
VIS    2025250    200200   15.1100  142.9700       6.3       189       901        91
VIS    2025250    200200   15.1200  142.9500       6.2       194       898        94
VIS    2025250    200200   15.1300  149.3600       7.6        10       963        95
VIS    2025250    200200   15.1300  149.3500       7.6        10       963        95
VIS    2025250    200200   15.1200  147.7500       6.9       348       973        95
VIS    2025250    200200   15.1000  143.3300       5.2       196       870        91
VIS    2025250    200200   15.0800  142.5500       6.4       189       907        93
VIS    2025250    200200   15.1000  142.3800       4.4       178       900        90
VIS    2025250    200200   15.1200  149.3700       7.6        11       975        97
VIS    2025250    200200   15.1100  149.3100       8.1         6       996        94
VIS    2025250    200200   15.1100  149.3000       8.2         6       997        94
VIS    2025250    200200   15.1100  147.7600       7.3       341       979        91
VIS    2025250    200200   15.0500  142.5500       5.4       190       926        96
VIS    2025250    200200   15.0600  142.5400       5.6       189       926        97
VIS    2025250    200200   15.0300  143.4000       4.8       214       910        97
VIS    2025250    200200   15.0400  143.3100       4.9       194       921        92
VIS    2025250    200200   15.0300  142.5400       4.2       193       940        90
VIS    2025250    200200   15.0400  142.4600       4.4       187       961        91
VIS    2025250    200200   15.0300  142.3000       5.4       185       938        99
VIS    2025250    200200   15.0300  142.2900       4.7       183       922        98
VIS    2025250    200200   15.0600  149.1300       7.4         4       998        97
VIS    2025250    200200   15.0500  149.1300       7.6         3       998        98
VIS    2025250    200200   15.0400  147.6600       6.8       352       972        91
VIS    2025250    200200   15.0300  143.4600       5.2       192       818        94
VIS    2025250    200200   15.0200  143.4300       4.6       202       851        90
VIS    2025250    200200   15.0100  143.3900       4.8       199       881        99
VIS    2025250    200200   15.0100  143.3800       5.3       196       894        97
VIS    2025250    200200   15.0100  143.3500       5.8       192       894        92
VIS    2025250    200200   15.0200  143.3300       5.4       189       904        93
VIS    2025250    200200   15.0300  143.3000       4.9       194       919        92
VIS    2025250    200200   15.0200  142.8300       5.7       201       985        91
VIS    2025250    200200   15.0200  142.8200       5.4       203       985        90
VIS    2025250    200200   15.0300  142.4800       5.2       187       962        91
VIS    2025250    200200   15.0100  142.3100       5.8       184       942        95
VIS    2025250    200200   15.0200  142.2800       4.7       184       922        95
VIS    2025250    200200   15.0300  149.1500       7.6         5       996        98
VIS    2025250    200200   15.0500  149.1400       7.6         4       996        98
VIS    2025250    200200   15.0300  147.7200       6.5         4       970        92
VIS    2025250    200200   15.0300  147.7000       6.6         9       970        90
VIS    2025250    200200   15.0400  147.6800       6.6       358       972        93
VIS    2025250    200200   15.0400  147.6600       6.7       352       972        95
VIS    2025250    200200   14.9900  143.4600       6.0       181       836        92
VIS    2025250    200200   15.0000  143.4000       5.4       192       858        95
VIS    2025250    200200   15.0000  143.3900       5.6       191       845        97
VIS    2025250    200200   15.0000  143.3700       6.0       192       894        90
VIS    2025250    200200   15.0000  142.5800       6.3       186       943        90
VIS    2025250    200200   14.9900  142.4200       5.2       191       938        95
VIS    2025250    200200   15.0000  142.3200       5.6       187       942        90
VIS    2025250    200200   15.0000  142.3000       5.7       186       946        96
VIS    2025250    200200   15.0000  142.2700       5.1       188       953        91
VIS    2025250    200200   14.9900  142.2600       5.2       186       953        92
VIS    2025250    200200   15.0200  149.1600       8.1         5       996        97
VIS    2025250    200200   15.0100  149.1400       8.0         3       977        96
VIS    2025250    200200   15.0100  147.7000       5.8         2       939        91
VIS    2025250    200200   14.9900  147.6900       5.7         4       939        94
VIS    2025250    200200   15.0000  147.6500       6.0       351       947        98
VIS    2025250    200200   15.0100  147.6400       6.1       348       952        99
VIS    2025250    200200   14.9900  147.6000       6.3       352       952        97
VIS    2025250    200200   14.9900  147.6000       6.2       353       952        97
VIS    2025250    200200   14.9700  143.4500       6.1       178       836        90
VIS    2025250    200200   14.9800  143.3800       6.3       186       794        93
VIS    2025250    200200   14.9700  143.3800       6.8       185       791        92
VIS    2025250    200200   14.9800  149.1500       8.1         0       968        95
VIS    2025250    200200   15.0000  149.1400       8.0         3       977        97
VIS    2025250    200200   14.9900  147.6900       5.6         5       939        92
VIS    2025250    200200   14.9800  147.6400       5.4       359       957        95
VIS    2025250    200200   14.9700  147.5900       5.8       358       944        96
VIS    2025250    200200   14.9600  145.6100       5.2       276       915        91
VIS    2025250    200200   14.9600  144.0200       8.5        91       191        91
VIS    2025250    200200   14.9600  143.4300       6.1       183       848        90
VIS    2025250    200200   14.9400  143.3400       5.7       189       867        93
VIS    2025250    200200   14.9400  143.3300       4.8       191       852        97
VIS    2025250    200200   14.9500  142.7900       6.2       190       923        94
VIS    2025250    200200   14.9600  149.1700       7.9       356       991        92
VIS    2025250    200200   14.9700  149.1400       8.1       359       977        96
VIS    2025250    200200   14.9600  149.1200       8.2       359       974        95
VIS    2025250    200200   14.9600  147.7600       6.6       349       985        95
VIS    2025250    200200   14.9400  147.7100       6.0         3       985        90
VIS    2025250    200200   14.9500  147.6100       5.7       359       944        93
VIS    2025250    200200   14.9300  145.5800       4.4       294       915        92
VIS    2025250    200200   14.9300  145.4500       4.9       271       882        91
VIS    2025250    200200   14.9300  145.4300       4.9       267       867        94
VIS    2025250    200200   14.9100  143.3500       4.8       193       863        92
VIS    2025250    200200   14.9200  143.3500       4.9       192       867        92
VIS    2025250    200200   14.9100  143.3100       5.2       187       852        97
VIS    2025250    200200   14.9100  143.3000       5.5       189       846        97
VIS    2025250    200200   14.9300  142.8700       7.1       189       930        91
VIS    2025250    200200   14.9200  142.8300       7.2       188       924        90
VIS    2025250    200200   14.9300  142.7900       7.5       189       921        90
VIS    2025250    200200   14.9200  142.7000       6.1       190       981        91
VIS    2025250    200200   14.9400  149.2700       8.1         2       999        90
VIS    2025250    200200   14.9500  149.2100       8.2         3       989        96
VIS    2025250    200200   14.9500  149.1700       7.9       356       991        95
VIS    2025250    200200   14.9500  149.1500       8.0       360       987        94
VIS    2025250    200200   14.9400  149.1200       8.2         0       987        92
VIS    2025250    200200   14.9400  149.1100       8.2       360       976        94
VIS    2025250    200200   14.9300  148.5700       7.9         5       992        93
VIS    2025250    200200   14.9200  145.5500       4.4       278       875        92
VIS    2025250    200200   14.9200  145.4500       4.9       273       889        91
VIS    2025250    200200   14.9200  145.4500       4.8       274       889        91
VIS    2025250    200200   14.9000  143.3400       5.4       194       867        95
VIS    2025250    200200   14.8900  143.3300       5.8       191       875        94
VIS    2025250    200200   14.8900  142.7800       6.8       186       899        93
VIS    2025250    200200   14.9100  142.7800       7.1       187       916        90
VIS    2025250    200200   14.9300  151.1500       8.4        54       993        91
VIS    2025250    200200   14.9300  151.1400       8.3        55       997        91
VIS    2025250    200200   14.9400  151.1200       7.9        56       997        90
VIS    2025250    200200   14.9100  149.2200       8.3         5       985        96
VIS    2025250    200200   14.9100  149.1800       8.0         2       985        94
VIS    2025250    200200   14.9300  149.1300       8.2         1       987        94
VIS    2025250    200200   14.9200  149.1000       8.2       359       978        90
VIS    2025250    200200   14.9200  148.5700       7.8         4       992        94
VIS    2025250    200200   14.8900  145.7300       4.1       265       918        91
VIS    2025250    200200   14.8900  145.7200       4.1       269       918        93
VIS    2025250    200200   14.8800  145.6400       5.4       268       921        90
VIS    2025250    200200   14.8800  145.5700       4.6       279       918        94
VIS    2025250    200200   14.8900  145.5400       4.9       281       900        98
VIS    2025250    200200   14.8800  145.5300       5.1       277       907        98
VIS    2025250    200200   14.8800  145.4700       4.9       272       932        97
VIS    2025250    200200   14.8800  145.4700       5.1       271       936        95
VIS    2025250    200200   14.8900  143.9400       8.4        94       191        91
VIS    2025250    200200   14.8700  143.4300       5.0       194       889        93
VIS    2025250    200200   14.8700  143.4200       4.9       196       883        92
VIS    2025250    200200   14.8800  143.3300       6.1       191       875        93
VIS    2025250    200200   14.8700  143.3300       6.3       190       875        92
VIS    2025250    200200   14.8600  142.7700       5.8       187       852        95
VIS    2025250    200200   14.9100  151.2700       7.1        62       988        93
VIS    2025250    200200   14.9100  149.2200       8.3         5       985        96
VIS    2025250    200200   14.8900  149.1900       8.0         4       977        95
VIS    2025250    200200   14.9000  149.1400       8.3         3       995        95
VIS    2025250    200200   14.9000  149.1300       8.3         2       987        94
VIS    2025250    200200   14.8900  149.0100       7.7       358       990        96
VIS    2025250    200200   14.8800  148.9900       7.7       357       990        97
VIS    2025250    200200   14.8800  148.8600       6.4         0       999        99
VIS    2025250    200200   14.8800  148.8400       6.1       359       999        96
VIS    2025250    200200   14.8800  148.6400       8.1         1       978        94
VIS    2025250    200200   14.8900  148.6100       7.8         1       978        94
VIS    2025250    200200   14.8900  148.5600       7.8         2       992        95
VIS    2025250    200200   14.8900  148.5400       8.1         2       993        91
VIS    2025250    200200   14.8600  145.7600       4.7       286       941        96
VIS    2025250    200200   14.8700  145.7400       4.7       271       944        93
VIS    2025250    200200   14.8800  145.6300       4.9       271       917        94
VIS    2025250    200200   14.8600  145.6200       4.5       273       912        99
VIS    2025250    200200   14.8600  145.5800       4.9       283       912        99
VIS    2025250    200200   14.8600  145.5800       5.0       283       918        99
VIS    2025250    200200   14.8700  145.4700       5.0       270       946        95
VIS    2025250    200200   14.8700  145.4600       5.2       272       936        97
VIS    2025250    200200   14.8700  145.3600       4.2       265       839        90
VIS    2025250    200200   14.8400  143.5400       4.3       203       832        90
VIS    2025250    200200   14.8600  143.4200       5.0       195       873        92
VIS    2025250    200200   14.8600  143.4100       4.9       200       873        90
VIS    2025250    200200   14.8600  143.3300       6.4       188       875        91
VIS    2025250    200200   14.8800  151.2800       7.0        69       962        92
VIS    2025250    200200   14.8800  151.2600       7.0        70       962        91
VIS    2025250    200200   14.8800  149.2000       8.0         5       977        94
VIS    2025250    200200   14.8700  149.1400       8.1         5       996        96
VIS    2025250    200200   14.8800  149.1300       8.2         2       990        96
VIS    2025250    200200   14.8600  149.1000       8.1       358       983        96
VIS    2025250    200200   14.8600  149.0700       8.0       357       980        95
VIS    2025250    200200   14.8700  149.0200       7.4       356       997        95
VIS    2025250    200200   14.8800  148.9900       7.8       357       990        96
VIS    2025250    200200   14.8700  148.8600       6.6       360       992        99
VIS    2025250    200200   14.8800  148.6400       8.1         1       978        94
VIS    2025250    200200   14.8500  147.8100       6.1       356       973        94
VIS    2025250    200200   14.8400  145.7400       4.1       283       918        98
VIS    2025250    200200   14.8300  145.6700       4.0       273       897        96
VIS    2025250    200200   14.8300  145.6500       4.6       277       909        94
VIS    2025250    200200   14.8500  145.6200       4.9       278       912        92
VIS    2025250    200200   14.8500  145.5900       5.2       283       912        95
VIS    2025250    200200   14.8500  145.5000       5.2       274       947        94
VIS    2025250    200200   14.8500  145.4600       4.8       269       947        95
VIS    2025250    200200   14.8200  143.3900       5.7       193       854        92
VIS    2025250    200200   14.8200  142.8800       7.2       186       912        91
VIS    2025250    200200   14.8200  142.8800       7.1       186       912        91
VIS    2025250    200200   14.8700  151.3600       6.2        65       988        92
VIS    2025250    200200   14.8500  149.1700       7.8         7       985        93
VIS    2025250    200200   14.8400  149.1500       7.9         3       996        96
VIS    2025250    200200   14.8500  149.1300       8.1         1       990        95
VIS    2025250    200200   14.8400  149.1200       8.1       359       987        95
VIS    2025250    200200   14.8600  149.0800       7.9       358       980        96
VIS    2025250    200200   14.8400  149.0500       7.8       358       978        93
VIS    2025250    200200   14.8400  149.0400       7.8       357       987        90
VIS    2025250    200200   14.8400  149.0200       7.7       358       987        95
VIS    2025250    200200   14.8400  148.8800       8.3         4       972        94
VIS    2025250    200200   14.8400  148.8800       8.1         2       972        95
VIS    2025250    200200   14.8400  148.8500       5.7         9       965        94
VIS    2025250    200200   14.8300  148.8000       5.9         8       982        92
VIS    2025250    200200   14.8400  148.6200       7.8         1       978        95
VIS    2025250    200200   14.8400  148.6100       7.9         1       978        95
VIS    2025250    200200   14.8300  147.8700       5.8         3       980        93
VIS    2025250    200200   14.8300  147.8200       5.9       357       970        96
VIS    2025250    200200   14.8300  145.6700       4.3       275       897        92
VIS    2025250    200200   14.8000  143.4100       5.4       193       866        95
VIS    2025250    200200   14.8100  143.4000       5.7       193       854        96
VIS    2025250    200200   14.8600  151.3500       6.7        58       994        90
VIS    2025250    200200   14.8200  148.7900       5.9         3       982        99
VIS    2025250    200200   14.8300  148.6100       7.7         2       978        95
VIS    2025250    200200   14.8300  148.5900       7.7         2       975        95
VIS    2025250    200200   14.7900  143.4700       4.8       196       871        95
VIS    2025250    200200   14.7900  143.4700       4.7       198       875        94
VIS    2025250    200200   14.7900  143.4100       5.1       195       867        91
VIS    2025250    200200   14.7700  142.4100       5.7       190       966        93
VIS    2025250    200200   14.8100  151.3700       6.7        44       976        99
VIS    2025250    200200   14.8000  150.4700       8.3        36       976        90
VIS    2025250    200200   14.8200  150.4000       7.7        26       974        98
VIS    2025250    200200   14.8000  150.3800       7.4        27       970        99
VIS    2025250    200200   14.8000  150.3700       7.5        27       962        98
VIS    2025250    200200   14.7900  148.7900       6.3         7       984       100
VIS    2025250    200200   14.8000  148.7500       7.6         6       986        97
VIS    2025250    200200   14.7900  148.7200       7.6       359       972        96
VIS    2025250    200200   14.7900  148.6900       7.7         0       981        92
VIS    2025250    200200   14.7900  148.6900       7.8         1       981        90
VIS    2025250    200200   14.7900  148.5700       7.9         0       973        94
VIS    2025250    200200   14.7800  148.5700       7.8         0       973        93
VIS    2025250    200200   14.7500  143.3800       6.1       187       883        93
VIS    2025250    200200   14.7500  142.7100       7.5       186       976        90
VIS    2025250    200200   14.7400  142.7000       7.5       186       976        91
VIS    2025250    200200   14.7400  142.6800       5.0       192       953        96
VIS    2025250    200200   14.7400  142.6500       4.7       190       879        95
VIS    2025250    200200   14.7400  142.4100       5.9       190       969        91
VIS    2025250    200200   14.7900  151.4200       8.9        47       988        94
VIS    2025250    200200   14.7900  151.3800       7.4        44       959        93
VIS    2025250    200200   14.7900  151.3600       6.4        43       966        90
VIS    2025250    200200   14.8000  150.5700       8.8        42       981        90
VIS    2025250    200200   14.7900  150.3900       6.8        29       970        97
VIS    2025250    200200   14.7600  148.9600       8.1         0       998        90
VIS    2025250    200200   14.7600  148.8800       7.6         2       999        95
VIS    2025250    200200   14.7700  148.8500       7.2         2       995        93
VIS    2025250    200200   14.7700  148.8400       6.7         6       988        95
VIS    2025250    200200   14.7600  148.8000       7.0         6       967        99
VIS    2025250    200200   14.7600  148.7800       7.2         5       975        98
VIS    2025250    200200   14.7700  148.7500       7.2         6       976        99
VIS    2025250    200200   14.7800  148.7200       7.4       359       972        97
VIS    2025250    200200   14.7600  148.7100       7.7       359       972        96
VIS    2025250    200200   14.7700  148.6100       7.8       358       973        93
VIS    2025250    200200   14.7800  148.5800       7.7         0       973        94
VIS    2025250    200200   14.7300  143.9900       8.6        88       189        91
VIS    2025250    200200   14.7400  143.5500       5.1       201       858        90
VIS    2025250    200200   14.7200  143.5300       6.0       192       862        91
VIS    2025250    200200   14.7300  143.3700       6.2       188       907        91
VIS    2025250    200200   14.7200  142.7100       7.4       185       976        92
VIS    2025250    200200   14.7200  142.6900       7.3       184       976        93
VIS    2025250    200200   14.7400  142.4800       4.9       193       954        92
VIS    2025250    200200   14.7200  142.4000       5.4       190       995        90
VIS    2025250    200200   14.7700  151.4400       7.9        46       988        95
VIS    2025250    200200   14.7700  150.4400       7.7        36       963        91
VIS    2025250    200200   14.7600  150.2900       7.1        26       961        98
VIS    2025250    200200   14.7600  150.2500       7.7        29       987        98
VIS    2025250    200200   14.7500  150.2400       7.5        29       987        96
VIS    2025250    200200   14.7500  148.9600       7.8         1       989        96
VIS    2025250    200200   14.7400  148.8500       6.9         3       978        92
VIS    2025250    200200   14.7400  148.8200       6.6         9       967        98
VIS    2025250    200200   14.7400  148.7900       6.7         6       932        98
VIS    2025250    200200   14.7500  148.7800       7.1         5       967        99
VIS    2025250    200200   14.7400  148.7500       6.6         8       975        91
VIS    2025250    200200   14.7600  148.7200       7.4         1       972        97
VIS    2025250    200200   14.7500  148.7100       7.6       359       970        96
VIS    2025250    200200   14.7500  148.6800       8.4       360       970        91
VIS    2025250    200200   14.7400  148.6500       8.1         1       966        92
VIS    2025250    200200   14.7500  148.6100       7.1         1       978        96
VIS    2025250    200200   14.7000  143.5400       5.9       193       882        91
VIS    2025250    200200   14.7000  143.5300       6.0       191       882        91
VIS    2025250    200200   14.7100  143.5100       5.9       188       864        93
VIS    2025250    200200   14.7000  143.4800       5.7       182       903        90
VIS    2025250    200200   14.7100  142.7100       7.2       185       976        93
VIS    2025250    200200   14.7100  142.7000       7.0       185       976        93
VIS    2025250    200200   14.7300  150.4800       7.6        27       981        97
VIS    2025250    200200   14.7500  150.4600       6.5        29       971        98
VIS    2025250    200200   14.7200  148.8300       6.4         9       967        97
VIS    2025250    200200   14.7200  148.8100       6.3        11       933        98
VIS    2025250    200200   14.7300  148.7800       6.7         6       931        98
VIS    2025250    200200   14.7200  148.7700       6.4         5       930        97
VIS    2025250    200200   14.7200  148.7200       6.4         5       984        98
VIS    2025250    200200   14.7100  148.6900       7.5       356       967        96
VIS    2025250    200200   14.7100  148.6600       7.6       359       964        96
VIS    2025250    200200   14.7100  148.6500       7.4       360       964        96
VIS    2025250    200200   14.7200  148.6200       7.2         2       965        96
VIS    2025250    200200   14.7200  148.6100       7.0         2       969        98
VIS    2025250    200200   14.7200  148.5200       8.1         4       999        92
VIS    2025250    200200   14.6900  143.9700       7.9        91       189        92
VIS    2025250    200200   14.7000  143.5300       5.9       188       891        90
VIS    2025250    200200   14.6900  143.5000       5.9       181       891        90
VIS    2025250    200200   14.7200  150.4800       8.0        26       989        97
VIS    2025250    200200   14.7200  150.4500       6.0        33       971        91
VIS    2025250    200200   14.6900  148.8400       7.1         9       971        97
VIS    2025250    200200   14.6900  148.8200       6.5        14       933       100
VIS    2025250    200200   14.6900  148.7900       6.2        12       911       100
VIS    2025250    200200   14.6900  148.7600       6.2         5       910        98
VIS    2025250    200200   14.6900  148.7600       6.2         3       912        97
VIS    2025250    200200   14.6900  148.7200       6.6       360       947        99
VIS    2025250    200200   14.6900  148.7100       6.9       359       950        98
VIS    2025250    200200   14.7000  148.6700       7.3       357       964        97
VIS    2025250    200200   14.6900  148.6600       7.2       358       958        97
VIS    2025250    200200   14.6900  148.6300       7.0       360       961        97
VIS    2025250    200200   14.6900  148.6000       7.2         4       961        96
VIS    2025250    200200   14.6900  148.5900       7.2         5       959        92
VIS    2025250    200200   14.6900  148.5000       7.1         3       981        97
VIS    2025250    200200   14.6900  148.4900       7.1         3       981        97
VIS    2025250    200200   14.6900  148.4700       7.2         1       981        92
VIS    2025250    200200   14.6700  143.6200       5.2       196       890        97
VIS    2025250    200200   14.6600  143.6100       5.0       198       916        95
VIS    2025250    200200   14.6700  143.5900       5.4       206       955        90
VIS    2025250    200200   14.6600  142.5100       4.9       196       999        95
VIS    2025250    200200   14.6700  148.8600       7.0         7       989        98
VIS    2025250    200200   14.6700  148.8400       7.1         9       957        99
VIS    2025250    200200   14.6700  148.8200       7.0        11       933        99
VIS    2025250    200200   14.6700  148.7900       6.5         8       911        99
VIS    2025250    200200   14.6900  148.7700       6.2         7       910        99
VIS    2025250    200200   14.6700  148.7300       6.4         3       918        99
VIS    2025250    200200   14.6700  148.7200       6.5         2       917        99
VIS    2025250    200200   14.6700  148.6900       6.9       358       946        96
VIS    2025250    200200   14.6800  148.6400       7.0       359       962        96
VIS    2025250    200200   14.6700  148.6100       7.2         2       963        93
VIS    2025250    200200   14.6600  148.5400       7.0       358       979        98
VIS    2025250    200200   14.6600  148.5200       6.9         1       979        97
VIS    2025250    200200   14.6800  148.5000       7.1         2       981        97
VIS    2025250    200200   14.6800  148.4900       7.1         1       981        98
VIS    2025250    200200   14.6700  147.0300       4.0       351       947        91
VIS    2025250    200200   14.6400  143.6300       4.4       204       916        95
VIS    2025250    200200   14.6600  148.8900       7.5         8       989        90
VIS    2025250    200200   14.6400  148.8500       7.1         8       955        99
VIS    2025250    200200   14.6500  148.8400       6.8        10       954        99
VIS    2025250    200200   14.6400  148.8100       7.1         8       904        98
VIS    2025250    200200   14.6600  148.7800       6.7         4       910        97
VIS    2025250    200200   14.6500  148.7600       7.0         2       918        96
VIS    2025250    200200   14.6600  148.7300       6.6         4       917        99
VIS    2025250    200200   14.6400  148.7000       6.4         3       911        97
VIS    2025250    200200   14.6600  148.6900       6.8       359       946        95
VIS    2025250    200200   14.6600  148.6800       6.8       358       950        93
VIS    2025250    200200   14.6600  148.6100       7.4         2       963        91
VIS    2025250    200200   14.6400  148.6000       7.7         2       973        94
VIS    2025250    200200   14.6500  148.5600       7.1         1       973        97
VIS    2025250    200200   14.6400  148.5400       6.9       359       973        98
VIS    2025250    200200   14.6500  148.5200       6.9         1       960        96
VIS    2025250    200200   14.6600  148.5000       6.9         2       962        95
VIS    2025250    200200   14.6000  142.2200       6.1       182       992        98
VIS    2025250    200200   14.6000  142.2000       6.3       179       992        98
VIS    2025250    200200   14.6000  142.1900       6.2       179       984        98
VIS    2025250    200200   14.6000  142.1500       5.7       185       984        97
VIS    2025250    200200   14.6200  148.8900       8.0         1       989        90
VIS    2025250    200200   14.6200  148.8600       7.9         3       954        95
VIS    2025250    200200   14.6200  148.8400       7.4         5       923        97
VIS    2025250    200200   14.6200  148.8100       7.1         7       904        98
VIS    2025250    200200   14.6300  148.7800       7.3         3       910        96
VIS    2025250    200200   14.6200  148.7600       7.0         6       913        97
VIS    2025250    200200   14.6300  148.7500       6.8         4       918        98
VIS    2025250    200200   14.6200  148.7100       6.4         9       905        96
VIS    2025250    200200   14.6200  148.7000       6.4         8       908        94
VIS    2025250    200200   14.6200  148.6100       7.1         2       973        97
VIS    2025250    200200   14.6200  148.5900       7.1         3       965        98
VIS    2025250    200200   14.6200  148.5600       6.9         2       956        98
VIS    2025250    200200   14.6200  148.5400       6.8       360       953        97
VIS    2025250    200200   14.6200  148.5300       6.8       360       953        96
VIS    2025250    200200   14.6000  143.0200       5.9       188       992        91
VIS    2025250    200200   14.6000  143.0000       6.1       187       992        91
VIS    2025250    200200   14.5900  142.7300       7.1       182       973        93
VIS    2025250    200200   14.5900  142.7200       7.1       182       973        93
VIS    2025250    200200   14.5900  142.2100       6.0       182       984        96
VIS    2025250    200200   14.5700  142.2100       5.9       182       958        93
VIS    2025250    200200   14.5900  142.1900       6.2       179       963        97
VIS    2025250    200200   14.6100  148.8900       8.0         1       989        92
VIS    2025250    200200   14.6000  148.8500       8.3         1       954        92
VIS    2025250    200200   14.6000  148.8400       8.0         2       916        94
VIS    2025250    200200   14.6000  148.8000       7.7         7       906        96
VIS    2025250    200200   14.6000  148.7900       7.5         9       904        97
VIS    2025250    200200   14.6000  148.7500       7.2         7       909        97
VIS    2025250    200200   14.6000  148.7500       7.1         8       909        98
VIS    2025250    200200   14.6100  148.7200       6.7         8       908        98
VIS    2025250    200200   14.5900  148.7000       7.1         6       913        96
VIS    2025250    200200   14.6100  148.6400       6.4         5       969        97
VIS    2025250    200200   14.5900  148.6100       6.7         1       973        99
VIS    2025250    200200   14.6100  148.5900       7.1         3       973        97
VIS    2025250    200200   14.6000  148.5600       6.7         4       955        98
VIS    2025250    200200   14.6000  148.5600       6.7         3       955        98
VIS    2025250    200200   14.5600  142.8800       6.0       191       925        93
VIS    2025250    200200   14.5600  142.8700       5.7       193       925        95
VIS    2025250    200200   14.5700  142.7200       6.5       183       973        94
VIS    2025250    200200   14.5700  142.2000       5.9       182       958        91
VIS    2025250    200200   14.5700  148.9700       8.6        20       987        93
VIS    2025250    200200   14.5800  148.9200       8.7         4       993        93
VIS    2025250    200200   14.5900  148.9000       8.4         3       991        90
VIS    2025250    200200   14.5900  148.8500       8.3         1       957        91
VIS    2025250    200200   14.5900  148.8400       8.1         1       941        93
VIS    2025250    200200   14.5700  148.8000       8.3         7       916        94
VIS    2025250    200200   14.5800  148.7800       8.2         8       916        94
VIS    2025250    200200   14.5700  148.7600       8.0         6       933        92
VIS    2025250    200200   14.5800  148.7400       7.7         7       913        95
VIS    2025250    200200   14.5800  148.7000       7.5         4       913        95
VIS    2025250    200200   14.5800  148.6900       7.6         3       940        94
VIS    2025250    200200   14.5900  148.6700       7.0         6       957        93
VIS    2025250    200200   14.5700  148.6300       6.7         4       957        99
VIS    2025250    200200   14.5900  148.6000       6.7         1       969        99
VIS    2025250    200200   14.5700  148.5800       6.8         2       965        98
VIS    2025250    200200   14.5700  148.5700       6.7         3       965        98
VIS    2025250    200200   14.5800  148.5500       6.6         2       955        96
VIS    2025250    200200   14.5700  148.5200       6.6         1       961        91
VIS    2025250    200200   14.5500  148.9800       8.3        23       987        94
VIS    2025250    200200   14.5500  148.9600       8.9        21       987        92
VIS    2025250    200200   14.5600  148.9200       9.5        11       991        91
VIS    2025250    200200   14.5500  148.8900       9.1         7       991        92
VIS    2025250    200200   14.5600  148.8700       8.8         5       972        91
VIS    2025250    200200   14.5700  148.8400       8.3         5       957        93
VIS    2025250    200200   14.5700  148.8200       8.2         6       933        95
VIS    2025250    200200   14.5500  148.8000       8.3         7       924        94
VIS    2025250    200200   14.5700  148.7900       8.4         7       921        94
VIS    2025250    200200   14.5700  148.7600       8.3         5       933        92
VIS    2025250    200200   14.5700  148.7300       7.9         1       940        93
VIS    2025250    200200   14.5700  148.7000       7.9         1       951        94
VIS    2025250    200200   14.5500  148.6800       7.7       360       970        95
VIS    2025250    200200   14.5600  148.6400       6.8         1       957        98
VIS    2025250    200200   14.5500  148.6200       6.9         3       953        97
VIS    2025250    200200   14.5500  148.6000       6.7       359       952        99
VIS    2025250    200200   14.5500  148.5900       6.7       360       952        99
VIS    2025250    200200   14.5600  148.5600       6.7         2       957        98
VIS    2025250    200200   14.5400  148.5300       6.9         3       969        95
VIS    2025250    200200   14.5100  142.8700       5.9       196       872        92
VIS    2025250    200200   14.5300  149.0200       7.8        14       986        97
VIS    2025250    200200   14.5400  149.0000       8.1        22       987        95
VIS    2025250    200200   14.5400  148.9800       8.4        22       986        94
VIS    2025250    200200   14.5400  148.9000       9.1         8       991        92
VIS    2025250    200200   14.5300  148.8700       8.8         7       962        93
VIS    2025250    200200   14.5300  148.8500       8.5         6       957        94
VIS    2025250    200200   14.5300  148.8400       8.4         5       933        94
VIS    2025250    200200   14.5400  148.8000       8.2         6       925        94
VIS    2025250    200200   14.5300  148.7800       7.9         5       943        95
VIS    2025250    200200   14.5300  148.7600       7.9         3       958        94
VIS    2025250    200200   14.5300  148.7400       7.8         0       981        93
VIS    2025250    200200   14.5300  148.7200       7.5         3       965        95
VIS    2025250    200200   14.5300  148.6900       7.6         3       965        95
VIS    2025250    200200   14.5400  148.6500       7.2         0       974        97
VIS    2025250    200200   14.5400  148.6300       6.9         3       957        96
VIS    2025250    200200   14.5400  148.6200       6.9         3       954        96
VIS    2025250    200200   14.5200  148.5900       6.8         3       963        90
VIS    2025250    200200   14.5400  148.5400       7.0         3       961        95
VIS    2025250    200200   14.4800  143.0700       4.6       193       963        91
VIS    2025250    200200   14.4900  142.6700       5.2       187       916        95
VIS    2025250    200200   14.5100  149.0000       7.9        14       986        96
VIS    2025250    200200   14.5200  148.9900       8.0        19       986        94
VIS    2025250    200200   14.5200  148.9800       8.1        20       957        92
VIS    2025250    200200   14.5000  148.9100       8.0         9       991        97
VIS    2025250    200200   14.5000  148.9000       7.9         6       991        97
VIS    2025250    200200   14.5100  148.8600       8.4         6       957        94
VIS    2025250    200200   14.5100  148.8400       8.4         5       938        94
VIS    2025250    200200   14.5000  148.8100       8.1         2       916        93
VIS    2025250    200200   14.5100  148.7900       7.9         4       916        94
VIS    2025250    200200   14.5000  148.7600       7.6         5       940        94
VIS    2025250    200200   14.5200  148.7600       7.9         2       958        94
VIS    2025250    200200   14.5200  148.7100       7.6         4       970        94
VIS    2025250    200200   14.5100  148.6900       7.9         4       966        93
VIS    2025250    200200   14.5000  148.5700       6.7         3       971        96
VIS    2025250    200200   14.5000  148.5600       6.7         2       971        96
VIS    2025250    200200   14.5100  148.5200       6.8       360       977        95
VIS    2025250    200200   14.4800  143.6900       4.1       206       937        99
VIS    2025250    200200   14.4700  143.6000       4.7       210       972        92
VIS    2025250    200200   14.4900  148.9400       8.1         8       991        96
VIS    2025250    200200   14.4900  148.9200       7.9         4       992        96
VIS    2025250    200200   14.5000  148.9100       8.0         7       992        97
VIS    2025250    200200   14.4800  148.8700       8.0         8       960        96
VIS    2025250    200200   14.4800  148.8600       8.0         8       954        96
VIS    2025250    200200   14.4800  148.8300       8.1         6       938        95
VIS    2025250    200200   14.4900  148.8000       7.9         3       906        93
VIS    2025250    200200   14.4800  148.7700       7.7         7       909        95
VIS    2025250    200200   14.4700  148.7600       7.6         9       916        96
VIS    2025250    200200   14.4900  148.5800       6.6         3       971        96
VIS    2025250    200200   14.4900  148.5700       6.6         3       971        96
VIS    2025250    200200   14.4900  148.5500       6.8         1       971        98
VIS    2025250    200200   14.4600  146.4100       4.8       347       914        91
VIS    2025250    200200   14.4500  143.5900       4.9       205       966        93
VIS    2025250    200200   14.4500  143.5700       4.8       218       935        97
VIS    2025250    200200   14.4600  149.7500       8.6         3      1000        93
VIS    2025250    200200   14.4600  149.7000       7.8         7       972        97
VIS    2025250    200200   14.4800  149.6100       8.3         4       988        93
VIS    2025250    200200   14.4600  149.5500       8.4         4       978        95
VIS    2025250    200200   14.4700  148.9100       7.7         6       988        97
VIS    2025250    200200   14.4700  148.8700       8.0         9       960        96
VIS    2025250    200200   14.4700  148.8400       8.1         6       938        95
VIS    2025250    200200   14.4700  148.8100       8.1         4       934        94
VIS    2025250    200200   14.4700  148.7800       7.7         6       916        95
VIS    2025250    200200   14.4600  148.7600       7.7        10       916        96
VIS    2025250    200200   14.4700  148.7500       7.6        10       916        96
VIS    2025250    200200   14.4500  148.7300       8.3         5       929        93
VIS    2025250    200200   14.4500  148.6300       7.7         1       992        94
VIS    2025250    200200   14.4500  148.5900       7.1         3       953        97
VIS    2025250    200200   14.4600  148.5700       7.1         1       952        97
VIS    2025250    200200   14.4500  148.5600       7.2       360       951        97
VIS    2025250    200200   14.4500  148.5400       7.2         1       939        97
VIS    2025250    200200   14.4300  146.4900       4.5       347       919        90
VIS    2025250    200200   14.4400  149.6600       7.5         9       989        95
VIS    2025250    200200   14.4400  149.6300       7.7         8       989        92
VIS    2025250    200200   14.4500  149.6000       8.1         5       986        96
VIS    2025250    200200   14.4400  149.5600       7.9         8       975        97
VIS    2025250    200200   14.4400  149.5500       8.0         7       975        97
VIS    2025250    200200   14.4500  148.8800       7.9         8       978        93
VIS    2025250    200200   14.4500  148.8700       8.0         8       974        93
VIS    2025250    200200   14.4400  148.8400       8.1         5       950        91
VIS    2025250    200200   14.4400  148.8100       8.1         3       938        93
VIS    2025250    200200   14.4500  148.8000       8.1         4       935        94
VIS    2025250    200200   14.4400  148.7700       8.1         8       929        93
VIS    2025250    200200   14.4300  148.7500       8.1         8       916        93
VIS    2025250    200200   14.4500  148.7200       8.3         3       920        93
VIS    2025250    200200   14.4300  148.7000       8.3         1       935        92
VIS    2025250    200200   14.4500  148.6700       8.0       357       991        91
VIS    2025250    200200   14.4500  148.6600       8.0       357       991        91
VIS    2025250    200200   14.4300  148.6200       7.3         2       953        96
VIS    2025250    200200   14.4400  148.6000       7.2         2       953        97
VIS    2025250    200200   14.4300  148.5800       7.0         2       952        97
VIS    2025250    200200   14.4300  148.5500       6.8         2       928        98
VIS    2025250    200200   14.4300  149.6600       7.6         8       989        96
VIS    2025250    200200   14.4100  149.6100       8.1         5       981        96
VIS    2025250    200200   14.4300  149.5700       7.9        11       979        97
VIS    2025250    200200   14.4100  149.5600       7.8        12       978        97
VIS    2025250    200200   14.4200  148.8800       8.1         6       978        92
VIS    2025250    200200   14.4200  148.8700       8.4         5       965        94
VIS    2025250    200200   14.4200  148.7800       8.0         8       938        91
VIS    2025250    200200   14.4200  148.7700       8.0         8       938        91
VIS    2025250    200200   14.4000  148.7300       8.0         2       953        92
VIS    2025250    200200   14.4200  148.7100       8.1         1       935        93
VIS    2025250    200200   14.4100  148.6800       7.9         2       956        94
VIS    2025250    200200   14.4000  148.6700       7.9         3       958        95
VIS    2025250    200200   14.4000  148.6300       7.2       357       958        97
VIS    2025250    200200   14.4000  148.6100       7.3       356       918        96
VIS    2025250    200200   14.4000  148.6000       7.2       357       918        96
VIS    2025250    200200   14.4200  148.4900       6.8         5       982        91
VIS    2025250    200200   14.4000  147.0900       4.2       351       887        94
VIS    2025250    200200   14.4000  148.7200       7.9         1       963        92
VIS    2025250    200200   14.3800  148.7100       7.9       360       978        93
VIS    2025250    200200   14.3800  148.6700       7.8         2       958        92
VIS    2025250    200200   14.3900  148.6400       7.5         1       958        96
VIS    2025250    200200   14.3900  148.6400       7.4         0       958        97
VIS    2025250    200200   14.3800  148.6100       7.4       357       918        95
VIS    2025250    200200   14.3800  148.4900       6.7         1       987        93
VIS    2025250    200200   14.3800  148.4500       6.6       358       986        99
VIS    2025250    200200   14.3800  148.4500       6.7       356       991        97
VIS    2025250    200200   14.3700  147.1300       4.1       354       909        94
VIS    2025250    200200   14.3800  147.1000       4.4       356       874        90
VIS    2025250    200200   14.3700  147.0700       4.2       351       874        90
VIS    2025250    200200   14.3700  147.0600       4.0       349       873        94
VIS    2025250    200200   14.3600  146.3900       4.4       294       979        91
VIS    2025250    200200   14.3800  150.5800       7.5        43       982        95
VIS    2025250    200200   14.3700  150.5700       7.9        41       982        94
VIS    2025250    200200   14.3700  148.7100       7.9       360       978        92
VIS    2025250    200200   14.3700  148.6800       8.0       360       978        92
VIS    2025250    200200   14.3700  148.6700       7.8         1       958        93
VIS    2025250    200200   14.3700  148.6500       7.8       359       958        94
VIS    2025250    200200   14.3700  148.6100       7.4       357       918        95
VIS    2025250    200200   14.3700  148.6000       7.4       358       918        96
VIS    2025250    200200   14.3700  148.5700       7.2         3       908        95
VIS    2025250    200200   14.3700  148.5600       7.3         5       920        91
VIS    2025250    200200   14.3700  148.4600       6.4         1       977        99
VIS    2025250    200200   14.3600  148.4600       6.5       360       965        98
VIS    2025250    200200   14.3200  143.6100       4.6       211       954        94
VIS    2025250    200200   14.3200  143.5900       5.0       207       977        91
VIS    2025250    200200   14.3500  150.6000       8.8        33       989        90
VIS    2025250    200200   14.3400  148.6300       7.6         2       969        93
VIS    2025250    200200   14.3400  148.6100       7.4         1       962        94
VIS    2025250    200200   14.3400  148.5900       7.2         3       944        95
VIS    2025250    200200   14.3400  148.5700       7.3         3       949        95
VIS    2025250    200200   14.3500  148.4700       6.4         1       975        92
VIS    2025250    200200   14.3300  148.4400       7.0       357       961        96
VIS    2025250    200200   14.3100  143.6400       4.9       206       904        91
OIR    2025250    200200   18.7800  145.1800      14.2       132       136        60
OIR    2025250    200200   17.9600  145.2800       5.1       163       144        60
OIR    2025250    200200   17.6200  144.9000       7.7       217       132        60
OIR    2025250    200200   18.9800  145.2400      13.5       128       140        60
OIR    2025250    200200   18.9800  145.2200      13.5       128       140        60
OIR    2025250    200200   18.9800  145.2000      13.6       129       136        60
OIR    2025250    200200   18.9800  145.1800      13.6       130       132        60
OIR    2025250    200200   18.9800  145.1600      13.7       130       140        60
OIR    2025250    200200   18.9800  145.1400      13.7       131       140        60
OIR    2025250    200200   18.9800  145.1200      13.8       131       140        60
OIR    2025250    200200   18.9800  145.1000      13.8       131       140        60
OIR    2025250    200200   18.9800  145.0800      13.8       131       136        60
OIR    2025250    200200   18.9800  145.0600      13.9       131       136        60
OIR    2025250    200200   18.9600  145.2400      13.5       128       140        60
OIR    2025250    200200   18.9600  145.2200      13.6       129       136        60
OIR    2025250    200200   18.9600  145.2000      13.6       129       136        60
OIR    2025250    200200   18.9600  145.1800      13.7       130       140        60
OIR    2025250    200200   18.9600  145.1600      13.7       130       136        60
OIR    2025250    200200   18.9600  145.1400      13.8       131       136        60
OIR    2025250    200200   18.9600  145.1200      13.8       131       136        60
OIR    2025250    200200   18.9600  145.1000      13.8       131       136        60
OIR    2025250    200200   18.9600  145.0800      13.8       131       136        60
OIR    2025250    200200   18.9600  145.0600      13.9       132       140        60
OIR    2025250    200200   18.9600  145.0400      14.0       132       136        60
OIR    2025250    200200   18.9400  145.2800      13.6       126       136        60
OIR    2025250    200200   18.9400  145.2600      13.6       127       136        60
OIR    2025250    200200   18.9400  145.2400      13.6       128       136        60
OIR    2025250    200200   18.9400  145.2200      13.6       129       132        60
OIR    2025250    200200   18.9400  145.2000      13.7       130       136        60
OIR    2025250    200200   18.9400  145.1800      13.7       130       132        60
OIR    2025250    200200   18.9400  145.1600      13.8       131       132        60
OIR    2025250    200200   18.9400  145.1400      13.8       131       136        60
OIR    2025250    200200   18.9400  145.1200      13.8       131       140        60
OIR    2025250    200200   18.9400  145.1000      13.8       131       136        60
OIR    2025250    200200   18.9400  145.0800      13.9       131       140        60
OIR    2025250    200200   18.9400  145.0600      13.9       132       140        60
OIR    2025250    200200   18.9200  145.2800      13.7       127       136        60
OIR    2025250    200200   18.9200  145.2600      13.7       128       136        60
OIR    2025250    200200   18.9200  145.2400      13.7       128       136        60
OIR    2025250    200200   18.9200  145.2200      13.7       129       136        60
OIR    2025250    200200   18.9200  145.2000      13.7       130       132        60
OIR    2025250    200200   18.9200  145.1800      13.8       130       132        60
OIR    2025250    200200   18.9200  145.1600      13.8       131       136        60
OIR    2025250    200200   18.9200  145.1400      13.8       131       132        60
OIR    2025250    200200   18.9200  145.1200      13.8       131       136        60
OIR    2025250    200200   18.9200  145.1000      13.9       131       136        60
OIR    2025250    200200   18.9200  145.0800      13.9       132       136        60
OIR    2025250    200200   18.9000  145.3200      13.4       125       140        60
OIR    2025250    200200   18.9000  145.3000      13.6       126       136        60
OIR    2025250    200200   18.9000  145.2800      13.7       127       132        60
OIR    2025250    200200   18.9000  145.2600      13.8       128       132        60
OIR    2025250    200200   18.9000  145.2400      13.8       129       136        60
OIR    2025250    200200   18.9000  145.2200      13.8       130       132        60
OIR    2025250    200200   18.9000  145.2000      13.8       130       132        60
OIR    2025250    200200   18.9000  145.1800      13.8       131       132        60
OIR    2025250    200200   18.9000  145.1600      13.9       131       136        60
OIR    2025250    200200   18.9000  145.1400      13.9       131       140        60
OIR    2025250    200200   18.9000  145.1000      13.9       131       136        60
OIR    2025250    200200   18.9000  145.0800      14.0       132       136        60
OIR    2025250    200200   18.8800  145.3400      13.3       125       136        60
OIR    2025250    200200   18.8800  145.3200      13.4       125       132        60
OIR    2025250    200200   18.8800  145.3000      13.6       126       132        60
OIR    2025250    200200   18.8800  145.2800      13.7       128       123        60
OIR    2025250    200200   18.8800  145.2600      13.8       129       132        60
OIR    2025250    200200   18.8800  145.2400      13.9       129       128        60
OIR    2025250    200200   18.8800  145.2200      13.9       130       132        60
OIR    2025250    200200   18.8800  145.2000      13.9       130       132        60
OIR    2025250    200200   18.8800  145.1800      13.9       131       132        60
OIR    2025250    200200   18.8800  145.1600      13.9       131       132        60
OIR    2025250    200200   18.8800  145.1400      13.9       131       132        60
OIR    2025250    200200   18.8800  145.1200      13.9       131       136        60
OIR    2025250    200200   18.8800  145.1000      13.9       132       136        60
OIR    2025250    200200   18.8800  145.0800      14.0       132       132        60
OIR    2025250    200200   18.8800  145.0600      14.2       133       132        60
OIR    2025250    200200   18.8600  145.4000      13.1       124       136        60
OIR    2025250    200200   18.8600  145.3800      13.1       124       132        60
OIR    2025250    200200   18.8600  145.3600      13.1       124       136        60
OIR    2025250    200200   18.8600  145.3400      13.1       124       136        60
OIR    2025250    200200   18.8600  145.3200      13.2       125       128        60
OIR    2025250    200200   18.8600  145.3000      13.4       126       123        60
OIR    2025250    200200   18.8600  145.2800      13.7       128       128        60
OIR    2025250    200200   18.8600  145.2600      13.8       129       132        60
OIR    2025250    200200   18.8600  145.2400      13.8       130       132        60
OIR    2025250    200200   18.8600  145.2200      13.9       130       132        60
OIR    2025250    200200   18.8600  145.2000      13.9       131       132        60
OIR    2025250    200200   18.8600  145.1800      13.9       131       128        60
OIR    2025250    200200   18.8600  145.1600      13.9       131       136        60
OIR    2025250    200200   18.8600  145.1400      13.9       131       128        60
OIR    2025250    200200   18.8600  145.1200      14.0       132       132        60
OIR    2025250    200200   18.8600  145.1000      14.0       132       128        60
OIR    2025250    200200   18.8600  145.0800      14.1       133       128        60
OIR    2025250    200200   18.8600  145.0600      14.3       134       132        60
OIR    2025250    200200   18.8600  145.0400      14.3       134       132        60
OIR    2025250    200200   18.8400  145.4200      13.1       123       136        60
OIR    2025250    200200   18.8400  145.4000      13.0       123       136        60
OIR    2025250    200200   18.8400  145.3800      13.0       124       132        60
OIR    2025250    200200   18.8400  145.3600      13.0       124       132        60
OIR    2025250    200200   18.8400  145.3400      13.0       124       128        60
OIR    2025250    200200   18.8400  145.3200      13.1       125       128        60
OIR    2025250    200200   18.8400  145.3000      13.2       126       132        60
OIR    2025250    200200   18.8400  145.2800      13.5       128       128        60
OIR    2025250    200200   18.8400  145.2600      13.7       129       132        60
OIR    2025250    200200   18.8400  145.2400      13.8       130       132        60
OIR    2025250    200200   18.8400  145.2200      13.9       131       128        60
OIR    2025250    200200   18.8400  145.2000      14.0       131       132        60
OIR    2025250    200200   18.8400  145.1800      14.0       131       132        60
OIR    2025250    200200   18.8400  145.1600      14.0       131       132        60
OIR    2025250    200200   18.8400  145.1400      14.0       132       128        60
OIR    2025250    200200   18.8400  145.1200      14.0       132       123        60
OIR    2025250    200200   18.8400  145.1000      14.1       132       128        60
OIR    2025250    200200   18.8400  145.0800      14.3       133       128        60
OIR    2025250    200200   18.8400  145.0600      14.4       134       132        60
OIR    2025250    200200   18.8200  145.4400      13.0       122       136        60
OIR    2025250    200200   18.8200  145.4200      13.0       123       132        60
OIR    2025250    200200   18.8200  145.4000      12.9       123       136        60
OIR    2025250    200200   18.8200  145.3800      12.9       123       132        60
OIR    2025250    200200   18.8200  145.3600      12.9       124       132        60
OIR    2025250    200200   18.8200  145.3400      12.9       124       128        60
OIR    2025250    200200   18.8200  145.3200      13.0       125       132        60
OIR    2025250    200200   18.8200  145.3000      13.2       126       132        60
OIR    2025250    200200   18.8200  145.2800      13.5       128       123        60
OIR    2025250    200200   18.8200  145.2600      13.8       130       128        60
OIR    2025250    200200   18.8200  145.2400      13.9       130       132        60
OIR    2025250    200200   18.8200  145.2200      13.9       131       128        60
OIR    2025250    200200   18.8200  145.2000      14.0       131       132        60
OIR    2025250    200200   18.8200  145.1800      14.0       131       128        60
OIR    2025250    200200   18.8200  145.1600      14.0       131       132        60
OIR    2025250    200200   18.8200  145.1400      14.0       132       132        60
OIR    2025250    200200   18.8200  145.1200      14.1       132       128        60
OIR    2025250    200200   18.8200  145.1000      14.2       133       132        60
OIR    2025250    200200   18.8200  145.0800      14.5       134       128        60
OIR    2025250    200200   18.8200  145.0600      14.6       135       136        60
OIR    2025250    200200   18.8000  145.4800      12.9       121       136        60
OIR    2025250    200200   18.8000  145.4600      12.9       122       136        60
OIR    2025250    200200   18.8000  145.4400      12.9       122       132        60
OIR    2025250    200200   18.8000  145.4200      12.9       122       132        60
OIR    2025250    200200   18.8000  145.4000      12.8       123       128        60
OIR    2025250    200200   18.8000  145.3800      12.8       123       132        60
OIR    2025250    200200   18.8000  145.3600      12.8       124       128        60
OIR    2025250    200200   18.8000  145.3400      12.9       124       123        60
OIR    2025250    200200   18.8000  145.3200      12.9       125       132        60
OIR    2025250    200200   18.8000  145.3000      13.2       126       128        60
OIR    2025250    200200   18.8000  145.2800      13.4       128       119        60
OIR    2025250    200200   18.8000  145.2600      13.8       130       123        60
OIR    2025250    200200   18.8000  145.2400      13.9       131       123        60
OIR    2025250    200200   18.8000  145.2200      14.0       131       128        60
OIR    2025250    200200   18.8000  145.2000      14.1       131       128        60
OIR    2025250    200200   18.8000  145.1800      14.1       132       132        60
OIR    2025250    200200   18.8000  145.1600      14.2       132       136        60
OIR    2025250    200200   18.8000  145.1200      14.2       133       128        60
OIR    2025250    200200   18.8000  145.1000      14.4       134       128        60
OIR    2025250    200200   18.7800  145.5000      12.9       120       136        60
OIR    2025250    200200   18.7800  145.4800      12.8       121       136        60
OIR    2025250    200200   18.7800  145.4600      12.8       121       132        60
OIR    2025250    200200   18.7800  145.4400      12.8       121       136        60
OIR    2025250    200200   18.7800  145.4200      12.7       122       136        60
OIR    2025250    200200   18.7800  145.4000      12.7       122       128        60
OIR    2025250    200200   18.7800  145.3800      12.7       123       128        60
OIR    2025250    200200   18.7800  145.3600      12.8       123       132        60
OIR    2025250    200200   18.7800  145.3400      12.8       124       128        60
OIR    2025250    200200   18.7800  145.3200      12.9       125       128        60
OIR    2025250    200200   18.7800  145.3000      13.1       126       123        60
OIR    2025250    200200   18.7800  145.2800      13.5       129       123        60
OIR    2025250    200200   18.7800  145.2600      14.0       130       123        60
OIR    2025250    200200   18.7800  145.2400      14.0       131       128        60
OIR    2025250    200200   18.7800  145.2200      14.1       131       128        60
OIR    2025250    200200   18.7800  145.2000      14.2       131       136        60
OIR    2025250    200200   18.7600  145.5200      12.8       119       136        60
OIR    2025250    200200   18.7600  145.4600      12.7       120       132        60
OIR    2025250    200200   18.7600  145.4400      12.7       121       136        60
OIR    2025250    200200   18.7600  145.4200      12.7       121       128        60
OIR    2025250    200200   18.7600  145.4000      12.6       122       128        60
OIR    2025250    200200   18.7600  145.3800      12.7       122       132        60
OIR    2025250    200200   18.7600  145.3600      12.7       123       132        60
OIR    2025250    200200   18.7600  145.3400      12.7       124       128        60
OIR    2025250    200200   18.7600  145.3200      12.8       124       128        60
OIR    2025250    200200   18.7600  145.3000      13.1       126       123        60
OIR    2025250    200200   18.7600  145.2800      13.6       129       128        60
OIR    2025250    200200   18.7600  145.2600      14.0       130       136        60
OIR    2025250    200200   18.7600  145.2400      14.1       131       132        60
OIR    2025250    200200   18.7400  145.5200      12.6       118       132        60
OIR    2025250    200200   18.7400  145.5000      12.6       119       132        60
OIR    2025250    200200   18.7400  145.4800      12.6       119       132        60
OIR    2025250    200200   18.7400  145.4600      12.6       120       132        60
OIR    2025250    200200   18.7400  145.4400      12.5       120       136        60
OIR    2025250    200200   18.7400  145.4200      12.5       121       128        60
OIR    2025250    200200   18.7400  145.4000      12.5       121       128        60
OIR    2025250    200200   18.7400  145.3800      12.6       122       123        60
OIR    2025250    200200   18.7400  145.3600      12.6       122       123        60
OIR    2025250    200200   18.7400  145.3400      12.6       123       123        60
OIR    2025250    200200   18.7400  145.3200      12.7       124       128        60
OIR    2025250    200200   18.7400  145.3000      12.8       125       128        60
OIR    2025250    200200   18.7400  145.2800      13.3       128       132        60
OIR    2025250    200200   18.7400  145.2600      13.8       130       136        60
OIR    2025250    200200   18.7200  145.5200      12.5       117       136        60
OIR    2025250    200200   18.7200  145.5000      12.5       118       132        60
OIR    2025250    200200   18.7200  145.4800      12.5       119       136        60
OIR    2025250    200200   18.7200  145.4600      12.4       119       132        60
OIR    2025250    200200   18.7200  145.4400      12.4       120       132        60
OIR    2025250    200200   18.7200  145.4200      12.4       120       132        60
OIR    2025250    200200   18.7200  145.4000      12.5       120       123        60
OIR    2025250    200200   18.7200  145.3800      12.5       121       128        60
OIR    2025250    200200   18.7200  145.3600      12.6       122       119        60
OIR    2025250    200200   18.7200  145.3400      12.6       123       128        60
OIR    2025250    200200   18.7200  145.3200      12.6       123       136        60
OIR    2025250    200200   18.7200  145.3000      12.8       124       132        60
OIR    2025250    200200   18.7200  145.2800      13.1       127       136        60
OIR    2025250    200200   18.7000  145.5200      12.5       117       136        60
OIR    2025250    200200   18.7000  145.5000      12.4       118       136        60
OIR    2025250    200200   18.7000  145.4800      12.4       118       132        60
OIR    2025250    200200   18.7000  145.4600      12.4       119       128        60
OIR    2025250    200200   18.7000  145.4400      12.4       119       132        60
OIR    2025250    200200   18.7000  145.4200      12.4       120       123        60
OIR    2025250    200200   18.7000  145.4000      12.5       120       128        60
OIR    2025250    200200   18.7000  145.3800      12.5       121       128        60
OIR    2025250    200200   18.7000  145.3600      12.6       121       128        60
OIR    2025250    200200   18.7000  145.3400      12.7       122       128        60
OIR    2025250    200200   18.7000  145.3200      12.7       123       136        60
OIR    2025250    200200   18.6800  145.5000      12.4       117       136        60
OIR    2025250    200200   18.6800  145.4800      12.3       118       132        60
OIR    2025250    200200   18.6800  145.4600      12.3       118       123        60
OIR    2025250    200200   18.6800  145.4400      12.4       119       123        60
OIR    2025250    200200   18.6800  145.4200      12.4       119       128        60
OIR    2025250    200200   18.6800  145.4000      12.5       120       132        60
OIR    2025250    200200   18.6800  145.3800      12.5       120       132        60
OIR    2025250    200200   18.6800  145.3600      12.6       121       132        60
OIR    2025250    200200   18.6800  145.3400      12.8       122       136        60
OIR    2025250    200200   18.6600  145.5000      12.3       117       136        60
OIR    2025250    200200   18.6600  145.4800      12.3       118       128        60
OIR    2025250    200200   18.6600  145.4600      12.3       118       128        60
OIR    2025250    200200   18.6600  145.4400      12.4       119       128        60
OIR    2025250    200200   18.6600  145.4200      12.4       119       128        60
OIR    2025250    200200   18.6600  145.4000      12.4       119       136        60
OIR    2025250    200200   18.6600  145.3800      12.5       120       132        60
OIR    2025250    200200   18.6400  145.5000      12.3       117       132        60
OIR    2025250    200200   18.6400  145.4800      12.3       117       128        60
OIR    2025250    200200   18.6400  145.4600      12.3       118       132        60
OIR    2025250    200200   18.6400  145.4400      12.4       118       128        60
OIR    2025250    200200   18.6400  145.4200      12.4       119       136        60
OIR    2025250    200200   18.6400  145.4000      12.5       119       136        60
OIR    2025250    200200   18.6200  145.5000      12.3       116       132        60
OIR    2025250    200200   18.6200  145.4800      12.3       117       132        60
OIR    2025250    200200   18.6200  145.4600      12.4       118       128        60
OIR    2025250    200200   18.6200  145.4400      12.4       118       136        60
OIR    2025250    200200   18.6000  145.5200      12.3       115       136        60
OIR    2025250    200200   18.6000  145.5000      12.3       116       132        60
OIR    2025250    200200   18.6000  145.4800      12.3       116       136        60
OIR    2025250    200200   18.5800  145.5200      12.3       115       136        60
OIR    2025250    200200   18.5800  145.5000      12.3       115       132        60
OIR    2025250    200200   18.5800  145.4800      12.3       116       132        60
OIR    2025250    200200   18.5200  145.5200      12.3       114       136        60
OIR    2025250    200200   15.8200  144.0800       4.8       191       128        60
